PROCUREMENT PLAN FOR SEAREE SUB-PROJECT PROPOSAL A. Imported package Expected Expected Contract Number Estimate Review Review Procurement bid/proposal Contract Implemen Code of Description cost by the by the Method invitation Award tation package (USD) PMU Bank Date Date Period Cyclo-pentane storage system  01 set of 270 lt Cyclo-pentane storage tank & pneumatic C5 loading pumps  Piping and accessories from C5 drums to tank.  Rigid piping from C5 storage tank to Premix unit Cyclopentane Pre-mixing and blending Station As specified in the PIM of 1 1 01 set of Pentane Premix Unit equipped with the HCFC Q4 - 2013 Q1 - 2014 Q1-3/2014 Prior Post Magnetic coupling and Inverter system on phase out Polyol side, including rigid piping to Project machine day tank.  01 set of 500lt Raw Polyol storage tank including transfer unit, equipped with magnetic coupling, inverter, other auxiliaries and piping to Premix.  01 set of 8HP Chiller for Polyol tank, including chilled water pumps and chilled water piping system from chiller to tanks. Expected Expected Contract Number Estimate Review Review Procurement bid/proposal Contract Implemen Code of Description cost by the by the Method invitation Award tation package (USD) PMU Bank Date Date Period Foaming line  01 set of High pressure pentane machines (Max output 100kg/min) completed with full auxiliaries  01 lot of High pressure rigid piping and flexible hose  01 set of Nitrogen purging valve for mix head Hydraulic Panel press 9m x 1.2m (2+2) with full auxiliaries Ventilation Fans Spark-free ventilation fans for the following areas:  02 Spark Free 5,000 m3/h Centrifugal Fan with 3Ø AC motor for Pentane storage and Premix  02 Spark Free 10,000m³/h Centrifugal Fan with 3Ø AC motor for Panel press with new foaming machine  02 Ventilation flow switches Safety systems for gas handling Expected Expected Contract Number Estimate Review Review Procurement bid/proposal Contract Implemen Code of Description cost by the by the Method invitation Award tation package (USD) PMU Bank Date Date Period 01 set of Electrical control Safety Panel for the following areas:  Pentane storage and Premix  Panel line with foaming machine. 01 set of MSA gas sensor and sensors calibration kit. 07 Hydrocarbon sensors/detectors 01 set of Remote Panel for Alarm System  Installation & Commissioning of equipment inclusive of training, preliminary discussion, project kick off site visits and post-conversion visit.  Sea freight, Packing and Fumigation. Sub-Total B. Local purchasing packages Expected Expected Contract Number Estimate Review Review Procurement bid/proposal Contract Implemen Code of Description cost by the by the Method invitation Award tation package (USD) PMU Bank Date Date Period Ducting System As specified in the PIM of 01 lot of Ducting system for Panel 1 1 the HCFC Q2-2014 Q2-2014 Q2-2014 Prior Post foaming lines and premix room phase out Project Safety systems for gas handling: a) 01 set of 30Kw Back-up power system (EPS) – Stand by Generator to run the ventilation fans and safety 2 1 panel b) 01 lot of High pressure nitrogen cylinders c) 01 lot of Water Sprinkler 3 1 d) 01 lot of Fire hose reel e) 01 lot of Portable fire extinguishers 4 1 f) 01 lot of Anti static floor covering Under PMU Fully borne by Searee supervision 5 1 Safety audit and Certification Post Company to ensure availability Page 4 of 5 of safety audit before production start-up Trials for validation of formulations: Direct 6 1 purchasing of chemicals and other Q2 – 2014 Q2 – 2014 Q2 - 2014 Prior Post Contract utilities Sub-total IOC claim (US$ 101,000 of IOC will be used for ICC) Grand Total (including part A + B + IOC Claim)  Note: 101,000 USD of IOC will be used for ICC. In case the bidding price is lower than sub-grant ceiling, PMU will pay the bidding price. Page 5 of 5