DOCUMENT OF • r.,. \ INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION ., • MONTHLY OPERATIONAL SUMMARY OF BANK AND IDA PROPOSED PROJECTS (As of July 31, 1975) SecM75-620 FROM: The Secretary August 25, 1975 • Section CONTENTS I. - Eastern Africa 1 - 11 II. - Western Africa 12- 22 III. - East Asia and Pacific 23- 33 • IV. - South Asia 34- 42 v. - Europe, Middle East and North Africa 43- 54 VI. - Latin America and Caribbean · 55- 70 VII. - New Projects 71- 74 Member Country, and Amount 2/ Borrower or and Probable Stage of Processing and 1/ !!_/ • Implementing Agency!/ Lender Project Action on Procurement I. EASTERN AFRICA BOTSWANA Ministry of Works 5.8 (R) Roads III - Construction of the Negotiations scheduled for • and Communications Botswana·Development Corporation (BDC) (Bank) To be determined Gaborone-Molepolole Road. Development Finance Company - To assist promotion of medium and small September, Awaiting utilization of funds ·1n · first loan. (Bank) scale industrial enterprises. Ministry of To be Livestock II, Project identification underway. Agriculture determined • Ministry of Works and Communications (Bank) To be determined Roads IV - Improvement of a section of the North-South road. Project preparation underway. (Bank) Ministry of To be Education I. Project preparation underway, Education .determined • (Bank) l/ If the Government is the borrower, the name of the department, ministry or agency which is to implement the project is given. If the Government is to relend the proceeds to another entity, the name of that entity is given. If the Government is not the borrower, the borrower's name is given in capital letters in parentheses. 2/ The amount is in millions of U.S. dollars and is approximate and tentative. • J.j The letter (N) before the project means that the project is a new listing in the Summary; the letter (R) means that the information about the project has been revised since the last issue of the Summary, Section VII of the Summary contains a recapitulation of the new projects listed in this issue, !!_/ This column contains available information, if any, about action with respect to the procurement of goods and services expected to be financed by the Bank or IDA, Distribution: • Executive Directors and Alternates President Senior Vice President, Operations Executive Vice President and Vice President, IFC President's Council Directors and Department Heads, Bank and IFC, • : .i::.··. • ••.: - 2. - Member Country, and Borrower or Implementing Agency}:_/ ·Amount 2/ and Probable Lender Project '}_/ Stage of Processing and Action on Procurement!!._/ • BURUNIJI Office des Cultures Up to Second Coffee Improvement (Extension Appraisal report being Industrielles du Burundi 6.0 (IDA) of first project financed by IDA (Cr. 147)), Project to include con- struction of 4 coffee washing stations, rehabilitation of about 150 hand pulping prepared. • centers, strengthening of extension services, and research to improve coffee production; improvement of food crop production. Infrastructure and • water supply, technical assistance. Total costs currently estimated at $8 million. Ministry of To be (R) Fish Processing - Improvement of Appraisal scheduled for September. Agriculture determined traditional lake fishing and fish and Livestock (IDA) processing; establishment of pro- cessing factories along Burundi side of Lake Tanganyika; improved marketing; social infrastructure and technical assistance. Total cost estimated at $9 million. • EAST AFRICAN COMMUNITY :J./ (EAST AFRICAN To be (R) Development Finance Company II, Appraisal report being prepared. DEVELOPMENT BANK) determined (EAST AFRICAN POSTS AND TELECOM. CORP.) (Bank) 30.0 . (Bank) Telecommunications IV. Appraisal delayed pending resumption of disbursements • under third EARC loan and clarification regarding future structure of the Corporation. (EAST AFRICAN HARBORS CORP, ) 35.0 (Bank) Harbors IV. Project under preparation. Further processing suspended pending resumption of dis- bursements under EARC loan • and clarification regarding future structure of the Corporation. (EAST AFRICAN RAILWAYS CORP.) 35.0 (Bank) Railways IV. Further processing suspended pending resumption of disbursements under EARC Loan and clarification regarding • future structure of the Corporation. ETHIOPIA Coffee Board l l. 5 (IDA) (R) Coffee Improvement Disease Control, rehabilitation and replanting with resistant varieties. Technical assist- ance and extension services. Appraisal scheduled for October. • Seep. 1 for footnotes. :J../ Comprising Kenya, Tanza·,:ia and Uganda. • • • • . • - 3 - Member Country, and Amount 2/ Borrower or and Probable ·stage of Processing and !_~lementing Agency !/ Lender Project}/ Action on Procurement !J../ • ETl!:(OP IA (Cont I d) National Water To be (R) Rural Water Supply I - Development of External financing institutions Resources determined community water systems in small being approached by Government Commission (IDA) towns and rural areas, for assistance in strengthening (NWRC) of central and regional institu- tions concerned with water supply; • evaluation of existing ·rural water supply facilities; and financing a few pilot water supply systems. Agricultural and 7.5 (R) Development Finance Company IV - Processing delayed pending In.1ustri:il Development (IDA) Industrial lending program. clarification of AIDB's future ll,u1k (AIDB) role. Livestock and 21.0 (R) Livestock III - Development of market Appraisal report being prepared. • Meat Board (i.MB) (IDA) oriented beef, sheep, and cattle production within framework of pastoral society. Likely to include three areas - Southern Rangelands, Jijiga, and Northeast Rangelands. Ministry of To ·be Livestock IV - Dairy development Project preparation underway. Agriculture determined project following up first dairy • Ministry of Agriculture (IDA) 25.0 (IDA) (R) project (Livestock I). Grain Storage and Marketing - Construc- tion of marketing centers, including Revised project proposal being considered brGovernment. · storage facilities and procurement of cleaning, drying, weighing equipment, plus construction of large scale cen- tral storage facilities, also technical • Ethiopia Highway . Authority (E):IA) 20.0 (IDA) assistance • Roads.VII - Sector loan for highway. Identification and preparatory work initiated • Ministry of 20.0 Agriculture Settlement - (a) Integrated Preliminary project preparation Agriculture (IDA) rural development project in Highlands underway. based on land reorganization and • (b) resettlement of landless peasants on unused Government land in the Western provinces. Addis Ababa To be (R) Water Supply - Addis Ababa II - Project identification underway. Water and Sewerage determined Further expansion of the water supply· Authority (AWSA) (Banlt) system of Addis Ababa. Ministry of 25.0 Agricultural Minimum Package Project Project preparation underway. • Agriculture (IDA) II (MPP) - Provision of a package of inputs (fertilizer, seed, credit and extension services) to small farmers. This will be a follow up to HPP I. Seep. 1 for footnotes • • • ,. l . - 4 - ·Member Country, and Borrower or Implementing Agency ]_/ Amount 2/ and Pr'obable Lender Project]./ Stage of Processing and Action on Procurement i/ • Ninistry of To be (R) Parks and ·Tourism - Assistance for Appraisal report under prepara'- Tour ism determined (Bank) parks and reserves development including road construction, viewing · ·faciliti.es, wildiife management and research and planning. tion. • Ministry of. To ·be Tourism - Development of Diani Beach Feasibility study underway, Tourism determined resort complex, part of r,overnment (Bank) program for development of additional Tana River Development 63.0 (Bank) (R) faciiities at the coast, Power II - Expansion of hydro genera- ting capaci.ty and associated· trans- Approved by Executive Directors July 1 and siened July 25; 197 :S, • Company (TROC) mission lines·. Total estimated cost including interest during construction Procurement: Export/suppliers - $l36 million. credits ,have been provtsionally arranged for part of the project • costs., Retroactive financing of about $i.5 million· recommended; Ministry of To be Education In·- To,suppori: qualitative Negotiations scheduled for Education determined improvements to primary school educa- September, (Bank/IDA) tion, including technical assistance. Ministry of Water 35,0'· Water suppl:y·for MOIDbas!l and coastal Negotiations substantially. Development (Bank} region - Development of new water completed; (Co-financing sources and additional distribution system. Total cost estimated at $80· million, including interest during construction. by Federal Republic of Germany likely.) Procurement: Retroactive • financing of about $550,000 recommended. i Ministry of To be (R) Integrated Agricultural Development - Appraisal report under preparation, I • I Agriculture determined Mixed farming; based primariiy on (Bank/IDA} cotton·, sunflower, .maize and pulses production in Western and Eastern provinces, Ministry of To be (R) Irrigation· in· lower. Tana River Basin Appraisal· Scheduled for October, Agriculture determined for cotton·; maize, sugar, and· (Bank/IDA) groundnut production •. Project would Ministry of To be offer employment for several thousand families. Rural· Access,,Road·s .- ·To ·assist labor Appraisal scheduled for •• Works determined intensive construction• and implementa- September. (Several aid., (Bank} tion of rural access roads programs agencies may finance the· with emphasis on training and evalua- construction of roads.) tion. Industrial Development Bank (IDB) 10.0 (Bank) (R) Second DFC line of-credit to IDB, Approved by Executive Directors July 8 and signed July 25, 1975. • Ministry of To be Assistance for sugar development in Identification underway. Agriculture determined Kenya. (Dan,k) Seep, 1 for footnotes. • • •. • Member Country, and Amount 2/ - 5 - Borrower or and Probable Stage of Processing and Implementing Agency!/ Lender Project}_/ Action on Procurement!!_/ KENYA -(Cont'd) • (CITY COUNCIL OF NAIROBI) To be determined (Bank) Water Supply III - Extension of Nairobi water supply system. Feasibility report under preparation. Ministry of Water To be Rural Water Supply - Provision of Identification underway. Development determined potable water for villages and rural (IDA) areas. • LESOTHO Ministry of To be (R) Rural Development II - Project would Project preparation underway. Agriculture determined expand the successful Thaba Bosiu (Co-financing with several (IDA) project by providing seed, fertilizer, agencies to be explored.) credit, extension services, soil conservation techniques, and improved • livestock practices to rural small- holders. Ministry of To be (R) Highways II~ Construction of a Appraisal report being prepared. Works determined mountain road from St. Michaels to (Co-financing with several (IDA) Thaba Tseka and provision for .agencies being explored.) technical assistance to the Ministry of Works. Project includes $0.5 L. million to assist development of a progr8111 for labor intensive construction. MALAGASY. REPUBLIC Ministry of To be (R) Education 11· - Improvement of educa- Unesco preparation mission Education determined tion system and faciliti~s in light tentatively scheduled for (IDA) of Gov_ernment' a education· plan. September, 197 5. • Directorate of Mines and -Power To be determined (Bank) Hydroelectric power plant· (80-100 MW) on Vohitra River.at Rogez, about 130 km east of Tananarive. Total project costs currently estimated at $80 Feasibility study in progress. (Co-financing being explored.) million. BNM (Malagasy To 'be Development Finance Company. Timing contingent upon BNM Development Bank) determined _evidencing need for external • Ministry of Rural Development (Bank) To be determined Irrigation/Rural Development - Content of project to be defined in light of financing • Timing of project processing contingent upon review by (Bank/IDA) clarification of Government strategy Government of strategy in in agricultural sector. agricultural sector. Ministry of To be Highways IV - Construction of Appraisal report being Public Works determined prepared. • Arivonimamo-Analavory primary road (Bank/IDA) (71 Ian) and Tairoanomandioy-Maintirano feeder road (370 km); technical assistance and training of Ministry of Public Works' personnel. Total cost estimated at $33 million. • Seep. 1 .for footnotes • • • Member Country, and Amount 2/ ._. 6 - •• norrower or and Probable Stage of Processing and Implementing Agency]_/ Lender Project '}_/ Action on Procurement!±_/ MALAWI Hlulst1·y of Education 10.0 (IDA) . (R) Educatiory II - Improvement of educa- tional system and facilities in·sup- port of education plan. Negotiations scheduled for September. • Ministry of To be Karonga Rural Development Program Project being prepared, Agr !culture determined II - Extension of first project finan- (IDA) ced by Credit 282-HAI. Provision of agricultural inputs, extension services, marketing facilities, credit, the introduction of improved farming methods and new crops and development of • infrastructure, Viph:,·:! Pulp To be Woodpulp Mill _arid Infrastructure - Project being prepared, Pre- and Paper determined Construction of 150,000 TPA long qualification of contractors • (VIPCOR) (Bank) fiber pulpmill to exploit existing for the civil works is expected Viphya forest resources. Mill will to be undertaken before be located at Chinteche, in the negotiations. (Co-financing northern region. Infrastructure, being explored!) par~icularly roads and ports facili- ties, will also be required, Total project costs curr~ntly estimated at $330 million. Electricity supply Commission of Malawi (ESCOM) 10.0 (Ban~) ~-· (N) Nev generating.facilities at Nkuh Falls and related transmission lines. Total cost tentatively estimated at $60 million (of which $42 million Feasibility report being com- pleted, (Co-financing being explored,) • foreign exchange). · · ·MAURITIµS Central Water. Authority To be determined (Bank/IDA) Water Supply a~d Sewerage - Improve- ment and· augmentation of three existing· domestic water supply schemes (Port·· Louis, Mare aux Vacoas and the Timing of appraisal contingent upon reaching agreement with Government on appropriate level of water tariffs, • Districts), and two sewerage schemes (Port Louis and Plain Wilhelms), to meet household and industrial demand. Development Bank of Mauritius To be determined (Bank) Financing of specific development projects through loans.to and invest- ments in enterprises in Mauritius. Appraisal Report being prepared. • Ministry of About Commercial Crops - Project to include Appraisal report being prepared. Agriculture 7.0 additional extension staff for improve- ment of existing coffee production; • (IDA) construction of 150 additional manual pulping ce~ters; planting of cinchona trees; land rehabilitation for improved foodcrop production; construction and improvement of lake landing points; technical assistance. Total cost esti- mated at about $8 million. Seep. 1 for footnotes. • • • - 7 - • Member Country, and Borrower or Implementing Agency ]_I Amount 2/ and Probable Lender Project]_/ Stage of Processing and Action on Procurement!!._/ RWANDA (Cont'd) Ministry of To be Agricultural Development (livestock) - Appraisal report being • A~ciculture determined Rural development based on livestock prepared . (IDA) and foodcrop production including roads, water supply, community·and health centers and schools; lake fishing; extension services; eradication of tse-tse fly infestation. Total cost estimated at about $15 million. • SOMAl.IA Mi:1Jstry of 4.0 Agricultural development in the Appraisal report being prepared. ,\gr icul tu;: c (IDA) North-West Region including land (Joint finan~ing being sought.) conservation, extension services, small-scale irrigation, water supply and preinvestment studies. • Mini.stry of To be Roads Ill - Improvement of the llargeisa- Consultants preparing feasi- Public Works determined Borama highway (about 144 Jans) with a · bility study, (Joint finan- (IDA) spur to Tug Wajale (~bout 20 kms). cing likely to be required.) Ministry of 4.5 (R)_ Port of Mogadiscio - extension of Negotiations substantially :_ Public Works (IDA) breakwater and addition of one berth completed. Presentation to to the new port now under construction, Executive Directors scheduled for September, • Drought Rehabilitation- Commission 8.0 (IDA) (R) Drought Rehabilitation. .Awaiting report of follow-up mission which hss just completed its field work, To be To be (R) Technical Assistance - Assistance in Further discussions with Govern- determined determined project preparation. ment planned for Fall of 1975. (IDA) • SUDAN Civil Aviation Tobe Domestic Aviation - Improvement of airports and facilities in southern Appraisal report under preparation. Department! determined (IDA) provincial capitals-and at Port Sudan. Roads and Bridges To be Highways II - Further development of Feasibility study underway. • ·cc1rporation determined (IDA) roads on lines indicated by pre- paratory work under existing road project, · Ministry of To be (R) Livestock I - Development of Preparation report sent to Agriculture determined livestock potential. Government. Further work on (IDA) irrigation component required. • Industrial Bank of Sudan Mechanized Farming 7.0 (IDA) To be (R) Second credit to Industrial Bank of Sudan. Third credit to the Mechanized Board consideration expected in September. Project under preparation Corp oration determined. Farming Corporation. by consultants. (IDA) • · See p. 1 for footnotes • • • - 8 - Member Country, and· Borrower or Implementing Agency.!./ Amount 2/ and Probable Lender Project '}_/ Stage of Processing and Action on Procurement !,__/ • SUDAN (Cont'd) Raliacl Corporation 20.0 {R) Second Creclit for the Rahacl Irrigation tredit signed July 11, 1975. and Ministry of Irri g,itfoJt ( WA) project to help meet the cost of additional· works and increases In the cost of original project. • Agricultural Production To be (N) Pump Scheme Rehabilitation - Rehabi- Review of preliminary data Corporation ancl determined· litation of existing pump schemes on underway; Ministry of Irrigation the Blue and White Nile Rivers. Ministry of Agriculture and Animal Produc tlon Corporation To be determined (IDA) (N) Deveiopment of inland fisheries on the Nile. Identification report prepared by FAO and sent to Government. • SWAZILAKD (SWAZILAND To be Thermal Power - 200 MW thermal Preliminary feasibility studies ELECTRICITY determined power static~ fueled by Swazi coal to completed\ discussions on finan- BOARD) (Bank) produce electricity for export to cing plan with South Africari. • Electricity Supply Commission in authorities in progress; drilling South Africa. Total project cost program underway to prove estimated to be more than $100 necessary coal reserves. (Co- miilion. financing will be required.) Ministry of To be F.ducatfon Ii. Project identification scheduled. Education determined within riext few months. Ministry of Agriculture (Bank) To be determined (R) Rural development1 improving produc- tion in 12 areas. Project preparation underway. • (Bank) National.Industrial To be Development Finance Company - To ~roject identification mission Development determined assist promotion of medium-size scheduled August 1975. Corporation (NIDC) TANZANIA (Bank) industrial enterprises. • Office of Prime 9.0 (R) Rural Development II (Tabora) - Inte- Appraisal scheduled for Minister (rnA) grated rural development project. October 1975. Ministry of 10.0 (R) Dairy Development I - Development of Credit approved July 1, 1975. Agriculture and Cooperatives (IDA) 18 dairy production units and Ujamaa dairy farms and development of processing for domestic consumption. • Ministry of Natural 8.0 (R) Fisheries - Development of inland and Apprai9al report under pre- Resources and Tour ism (IDA) coastal fishing. paration. Ministry of Natural 8.0 Forestry I - Development of the fores- Apprai8ai mission scheduled Resources and Tour ism Ministry of Commerce and Industries (IDA) 23.0 (Bank) (R) try resources. Industry II - Development of an industrial estate at Horogoro. for early September, Appraisal scheduled for September 1975. • National Development Corporation (NDC) Seep. 1 for footnotes. • • • - 9 - • Member Country, and Amount 2/ • Borrower or and Probable Stage of Processing and Implementing Agency)_/ Lender Project 1/ Action on Procurement ii TANZANIA (Cont'd) Ministry of Water 7.0 Water Supply I - Water supply and Project being prepared by and Power (IDA) sewerage development in secondary Government with consultant's • Ministry of Education 9.0 (IDA) urban centers • F.f To be .(R) Coc<>a It - Follow-up of first cocoA Appra1.s:,l report prepared. • Cor.mf Affairs determined project consisting of planting of (Bank) .cocoa areas in Ashanti Region. (POSTS ANH TF.J.E- · 23.0 (R) TelecommunicationR - Rehabilitation Loan anproved hy Execul:i.ve Directors COHMlJNI r/\THlNS (Bank)· and expansion of telecommunications on June 9, RiP,ned June 10, r.oRPORATTON (GPT)) network over 4-year period, Includes increase of 16,000 lines in exchange Procurement: Retroactive capacity And strengthening long- financ.1.ng for consul t'1nt • distance telephone and telex circuits, services (up to $75,000). as well as Rerviccs for improved management and engineering. Mf.nistry of To he (R) Upper Region integrated agricultural/ Prcappraisal report under prepara- Ai;ri r.ul t•.1re determined rural development project, tion And IR exp~ctcd to be comple- (Bank/IDA) by late Septcmhcr 1~75, Electr:1.city 10.0 (R) Expansion of low voltage distribu- Project documentation being Corpot·11 tion of Ghana (ECG) (Dank) tion system. prepared hy ECG, a,~ appraisal tentatively scheduled for October 1975. • Volta River To be (R) . Expans.ion of power generation Feas:1.bility report reviewed · Authority determined facilities at Kpong. and commented upon. Ghana Highway 15.0 Highways II - Follow-up of ongoing Appraisal report being_prepared. · Authority/Bank for Housing and Construction •. {Bank) 10,0 (IDA) ,project. Includes assist11nce for road maintenance and improvement of a trunk road and strengthening of domestic construction industry. Procurement: Retroactive finan- cing for consultants' services (about $50,000) has been proposed. • (NATIONAL tNVF.STMENT 10.0 To provide import financing require- Appraisal report in preparation. .. BANK) (Bank) ments for NIB. Ghana Sugar Estates ·.: (GRASEL) To be determined (Bank) (N) Expansion of sugar production. Feasibility study financed under ongoing project, completed July 1975, under review; . • · Ministry of To be (N) Assistance to small- Discussions under way on project ·,:·Industries determined scale enterprises content. (IDA) ~ DABOYA FRUITEX and Ministere du 7,0 (IDA) . (R) · -Production of irrigated pineapple; studies of rice and livestock sub- Credit signed on July 2, 1975 • Developpement Rural sectors. Hinistere des 14, 0 (R) Highways I - road maintenance consist- Appraisal report beinr, prepared, Travaux Publics (IDA) ing of technical assistance, equipment procurement, workshop construction and preinvestment studies, Procurement: Retroactive financing of $150,000, has been proposed for consultant services. • To be 10.0 (R) Smallholders rice development. Consultants, financed under the .determined (IDA) Dahoya project, being hired. Studies expected hy end 1976. Seep. 1 for footnotes, • • • - 16 - • Member Country, and Borrower or Implementing Agency ll Amount 2/ and Probable Lender Project]_/ Sta~e of Processing and Action on Procurement!!_/ GUINEA (Cont'd) To be 5.0 (N) Livestock development Consultants financed under the • detetmined (IDA) Daboya project being hired, Studies expected by end 1976. Societe de Developpement 10.0 Rice development in forest region Preliminary drafi: of appraisal du Riz (SODERIZ) (Bank) between Gagnoa and Daloa to include report prepared, (Co-financing terracing, irrigation works, extension by CCCE). Further· processing • services and agricultu·ral inputs.· Total project cost about $18 million. in abeyance pending resolution of a numher of issues. Procurement: Government request for retroactive financing of preparatory work on swmnp development during 75/76 season. • Direction des 30.0 Urban Development - East~West express- Awaiting completion of final Travaux Publics · (Bank) way and port road and _infrastructure preparation of some components for Banco-residential area. of project and clarification of policy issues with Government before possible appraisal in late fall. Procurement: Study contract awarded to BCEOM and BNETD • under Ln. 837. Invitation for prequalification for construc- tion of East-West highway issued by Government. Societe des Eaux de 10.0 (R) Extension of existing and ·construc- 13 of about 30 draft feasibility la Cote d'Ivoire · (Bank) tion of new water supply systems in studies for secondary centers secondary centers. received; remainder expected by • Regie Abidjan- Niger (RAN)· 10.0 (Bank) (R) Railroad - Improvement of Abidjan- Ouagadougou rail line from Boueke fall when appraisal is expected • Pre-appraisal mission report reviewed. RAN undertaking study to Tafire (175 km) and possibly to reduce original scope of provision of rolling stock. project expected to be completed before end 1975. • Direction des Travaux Publics 43.0 (Bank) (R) Roads V - construction and realignment of Anyama-Agboville road and a section of Abidjan-Adzope roads, Pavement strengthening of N'Douci-Yamoussoukro Presentation to Executive Directors scheduled for August. and N'Douci-Gagnoa roads and pre- investment studies, technical assistance, training and oversees fellowships. Total cost about $69 million • • Energie Electrique de Cote d'Ivoire (EEC!) 15.0 (Bank) (R) Hydroplant on Sassandra River - Trans- mission and distribution. Feasibility studies for hydro- plant to be completed by mid-1976. Seep. 1 for footnotes • • • • -1 i -·' 17 - Member Country, and Amount ?:_/ • Borrower or and Probable Stage of Processing and Imelementing Agency]__/ Lender Project'}_/ Action on Procurement!±/ IVORY COAST (Cont'd) Soc1ete d'Assistance Teclmf.que pour la Modernisation Agricole 7.0 (Bank) Ap,rtculturR.l developmerit program of cocoa and food crop planting and P,r.neral ap;rict1ltural development, Feasibility studies ~eing prepared by consultants. • de la Cote'd'Ivofre includi~g settlement of lands in (SATMACI) Western r~eion. CREDIT DE LA COTE 5.6 (R) DFC: loan to provide Hne of credit for Negotiations completed. Presepta- d'IVOlRE (r.CI) Banque Ivoirienne de (Bank) A.n small-scale enterprise development. DFC loan to provide line of credit tion to Executive Directors scheduled for Sept~mher, Negotiatiops scheduled for • Developpement (Bank) for medium size Ivor:l.an enterprises. beginning of Aur,ust. Industriel (BIDI) To be 20.0 (R) Oil Palm and Coconuts - First Prel_iminary proposal!! expected Determined • (Bank) phase 911 palm and cocon~t pla~ta- in August 1975. (Possihle co- tions with related industrial facili- financing by CCCE, EIB,) ties for ~o~th West, · · To be 15.0 Rubber II - Follow up of Grand Rereby The final review of the ongoipg Determined (B,mk) project, Grand ~ereby project (Ln. 938-IVC) is tentatively scheduled for Nove1111>~r 1975. LIBERIA Hini8try of Agriculture 6.0 (IDA) (R) Agriculture - Integrated rural develop- ment in Lofa County, Credit approved by Executive Direct~rs on July 22, • (Liberia Electricity 1. 8 (R) ·Power Iii - Technical assistance for Loan approved by Executive Corporation) (Bank) management improvement and hydro Directors on July 8. studies, Mit1istries of Education, Labor and Agriculture 6,0 (IDA) Education II - Community school pro- gram and related teacher training; continued reinforcement of education Pre-appraisal report in preparation, • admin:lstration; vocational training center;· forest ranger training program; broadening of secondary schools curriculum. Public Works Ministry 27. 5 (Bank) (R) Highways III - C_onstruction of UN Drive, and Mesurado bridge, Totota- Ganta road and 150 miles of feeder road; pre-investment studies and Negotiations completed. Board Presentation scheduled for August. • u_rban study of }lonrovia. To be 15.0 Forestry - Project likely to include Project preparation to be carried determined (Rank) financial assistance for developing out jointly by FAO/IP.RD Cooper- forest-based industries and technical assistance for Government forest services, tive Program and by German Aid Fund tentative_ly sch~duled for completion by late 1976. • Ministry of 10.0 Rehabilitation of existing small and Ruhber survey completed. Con- Agticul ture (Bank) medium sized rubber plantations and sultants and RMl·!A discussed out- clearing of old plantations as well line of project preparation re- as new plantings, port which is expected to be completed Au~ust 1975. • Seep. 1 for footnotes, • • - 18 - • Member Country, and Borrower or Implementing Agency}__/ Amount 2/ and Probable Lender Project'}_/ Stage of Processjng and Action on Procurement!!_/ LIBERIA (Cont'd) Ministry of 6.0 (R) Integrated agricultural development AIIT study completed and being • Agriculture (IDA) in Bong county, including road con- struction, swamp clearing, land use planning extension services, train- ing, marketing, credit and other reviewed by Government. (USA ID interested in providing financial assistance.) essential social services. (National Port 5.0 (N) Rehabilitation of Monrovia National Port Study by Authority) (Bank) port. consultants expected to be • (Liberian Bank for Development and 10.0 (!lank) (N) DFC loan to provide a line of credit for small and medium enterprise completed early 1976 • Follow-up of LBDI Loan (1055 LBR of Dec. 1974) Investment development in industry, agricul- (LBDI) ture, forestry. MALI Ministere de 15.0 Three-year cotton and food crops de- Appraisal -tentatively scheduled !'Agriculture (IDA) velopment program - extension of for September. ongoing FED financed project, includ- ing inputs, equipment, technical assistance and feeder roads. Direction· 10.0 Highway III - Continuation of feeder Aporaisal report being prepared. des Travaux (IDA) road and highway maintenance programs. • Publics Procurement: Retroactive finan- cing for road improvement works carried out by Government forces in 1975 will be recommended. Ministere de 8.0 Rice II - Construction and rehabili- Feasibility study carried out 1' Agriculture· (IDA) tation of polders for rice cultivation by Government/IER/RMHA to be in the inland delta region of the Niger completed by December 1975. • MAURITANIA valley. · Ministere de up to 8.0 (R) Nouadhibou port expansion - Negotiations substantially com- l'Equipement (IDA) Including extension of fishing and pleted. Tenders were opened on commercial wharves and technical June 16; cost substantially higher assistance to increase port produc- than forecast, therefore presen- tivity. Total project cost now esti- tation to Board delayed until mid- • mated· at about $27.5 million • October to permit discussions with co-financiers (Kuwait Fund and CCCE) to obtain supplementary financing. ~linistere du Developpe- 4.0 (R) Rural develooment in south eastern Feasibility study being reviewed. ment Rural (IDA) region - Project alms at increased production of dry crops through strengthening of extension service, • farmers' credit, marketing organiza- tion and feeder roads, mainly by Guidimaka and Southern areas of 1st, 2nd and 3rd Regions. Seep. 1 for footnotes • • • • - 19 - • Member Country, and Amount 2/ Borrower or and Probable Stage of Processing and Implementing Agency l/ Lender Project'}_/ Action on Procurement!!._/ MAURITANIA (Cont'd} 4.0 Gorgol Irrigation - First phase of Engineering study carried out • (IDA) irrigation project in Gor3ol Valley by SCET consultants suhstantially to develop 3,500 ha of rice and completed. Mission to collect other diversified crops. additional data scheduled for early fall. (Co-financing with FED envisaged.) · · • Ministere des 10.0 Highways III - Construction and Appraisal report being prepared. Trevaux Publf.cs (IDA) maintenance of roads; preinvestment studies. Procurement: Retroactive finan- cing for up to $60,000 recommended for preparation of bidding documents, Ministere de l'Economie Rurale 10.0 (IDA) (R} Rura-1 ·development - Integrated devel- opment of Maradi area, including ex- tension services and provision of Final agreement was reached with _Government on project scope and organization. Appraisal report • farm inputs, under preparation. Procurement: Retroactive finan- cing for up to $300,000 to be_ Office des Pastes ct Telecommunications 3,0 (IDA) (R) Telecommunications - Expansion of inter-urban and long distance net- recommended, Appraisal tentatively scheduled for September 1975. • work. Ministere de 8.0 Irrigation for rice production on·1,500 Mission preparing report. l'Economie Rurale (IDA) ha in Namarigoungou. NIGERIA Federal Ministry of 17.0 Oil Palm I - Rehabilitation and expan- Loan approved by Executive • Agricultur:e and (Bank) sion on nucleus estates and small Directors on June 17, 1975. Natural Resources holdings of oil palm in Western State. Total project cost is estimated at $34 million. Federal Ministry of Agriculture and Natural Resources 19,0 (Bank) Oil Palm II - Rehabilitation and ex- pansion on small holdings of oil palm in East-Central State, Total project cost is estimated at $38 million. Loan approved by Executive Directors on June 17, 1975. • Federal Ministry of· 29,5 Oil Palm III - Rehabilitation and ex- Loan appro··,ed 1:y Exe;:utive Agriculture end (Bank) pansion on nucleus estates and smell Directors on June 17, 1975. Natural Resources holdings of oil palm in mid-western Federal Ministry of 14.0 State, Total project cost is estimated at $59 million, Rubber - Rehabilitation of rubber Negotiations substantially • Agriculture and (Bank) smallhoidings in mid-Western State. completed. Presentation to Natural Resources Executive Directors expected in September 1975. Seep. 1 for footnotes. • • • i· • Member Country, and Amount 2/ -·20 - Borrower ·or and Probable Stage of Processing and Jmplementing Agency]._/ Lender Project '}_/ Action on Procurement!!._/ NIGfRIA (Cont'd) • Federal.MiniAtry of Agriculture and Natural Resources 21.0 (Bank) Agricultural Development (Gombe) - Ex- pansion of cotton, groundnuts and food crops production in North East State, Loan approved by Executive Directors on December 19, 1974. Total cost estimated at $42 million, Federal Ministry of Up to (R) Water Supply (Western State) - Package At Government's request further F.fnance 40,0 of new water schemes to tovnshipa in processing suspended. • (Bank) rural areas and extensions to urban schemes, ·Federal Ministry of . 20.0 (R) Kaduna Water Supply extension of urban Appraisal report unJer pre- Fina11ce (Bank) water supply system for Kaduna City. paration but subject to Government re3ponse to Bank proposals. Federal Ministry 15.0 Katsina Emirates - Five regional water Further preparation dependent on • of Finance Federal Ministry of (Bank) Up to supply schemes for t0"7lls and villages. Establishment of small~scale indus- Government reaction to Kadnna project. Draft appraisal report beine '-- In_dustries 30.0 trial centers. prepared, (Bank) Federal Ministry·· of 40.0" Irrigation - Development of about Negotiations substantially Agriculture and , (Bank) 60,000 acres of land in the Kano completed. Presentation to Natural Resources River region. Executive nirectors expected in September 1975. Lagos State To be Extension of Lagos <1ater supply Appraisal tentatively scheduled Ministry of Works determined system. for YY77. (Bank) • SENEGAL Ministere du Developpe- ment Rural , About 4.5 (IDA) (R) Livestock development in Eastern region will likely include watering Appraisal report being prepared. (Possible co-financing by Kuwait points, pasture improvement, fire Fund and Arab Bank for the breaks, well ~aintenance equipment. Economic Development of Africa - AIIEDIA), Societe des Terres 2.0 (R) Terres Neuves II - Follow-up Credit approved July 8. • Neu;;es (STN) (IDA) project. Resettlement and studies on integrated development in Eastern Senegal. Ministere des Travaux About (R) Highways Ill - Second phase of pave- Appraisal report beinr, prepared •. Publics et des 14,5 ment strengthening program. Transports (Bank) • Dakarmarine Up to 30.0 (Bank) Ship repair - Dry docks and repair facilities for ships up to 500,000 dwt. Studies financed by Loan S-3 being reviewed. Delegation Generale About Tpurism - Infrastructure facilities Studies financed by UNDP du Tourisme · e.o ·in the Petite Cote area. heAan mid-June 197~. (Bank) • Seep. 1 for footnotes, • • - 21 - Member Country, and . Borrower or lmplementing Agency 1_/ Amourtt 2/ and Probable Lender Project'}_/ Stage of Processing and A~tiorl bri Procurement 1/ • SENEGAL (Cont'd) Port Autonome 6.0 (R) bakar Port - Extension of fishirt~ Economic studies arid revised de nak11i" (PAD) (Bartk} 1marf and facilides, • engine~r{rtg expect~d to be com~leted within next 4 mdhtks. (Co-firtancing beihg sought.) Procurement: Retroactive fin~h- cing up to $150,oob beirtg con- sidered; Minietere dee 7.0 (R) Highways IV - Construction and Apprats~i report being prepared. Travaux Publics et des Transports Ministere du Developpe- (Bartk) · 10.0 improvement of feeder roads, Development of irrigated and rainfed Prepatation underway with the • rnent Rural (Bank) site cultivation in Casamance, cooperation of the Government and RMWA with support from consultants, SIERRA LEONE Ministry of ~ucation 7,25 (IDA) (R) Educatiorl tr - Diversification of program at secbndaty ie~eij support Approved by Executive D!rectore juiy 22 and signed iuiy 29, 1975. • of rural ahd non-formal training; educational planning, marulgernent and management training. Procurement: Retroactive firtancing (abouf ~265,00b) td cbvet arthitet~ tutai cijriauit~rtt tees and cbtllple- mentary works at first project sites. • Ministry of 5,0 (R) Rural deveidpmettt II - Development in Loan and Credit Agreemertt signed Agriculture (Bank) northertt provihce of iniartd valley July :!j 1975. s.o swamps for irrigation of rice and (IDA) other foodcrops; development of upland farms for tainfed crops cultivation1 study of possible 1ivestock develop- ment; assistance to help strengthen Ministry of Agticulture. Also exten- sion of existing Eastern province pro- • ject. Ministry of 16.0 (R) Highways It - Highway rnilihtettahce; Highwiy fuaintehartce program Public Works (Bank/IDA) construction of urban eectioh of being ptep~ted by cdnsbltants. Freetbwtt-l•aterioo ran Development Corporation 50.0 (Rank) (R) llrl",an Development II - Further Kampong improvement in Jakarta, and sites and services and Kampung improvement in Project preparation underway. Sura Raya. • Seep. 1 for footnotes • • • - 2(, - Member Country, and· Rorrm,er or Implem_~'!!_iE_g_~gency Y Amount 2/ and Probable Lender Project}_/ Stage of Processing and Acti.on on Procurement'!._/ • l.N~')N:!:aA (Cont'd) i-fin18try uf 15.0 Education V - Assistance for regional. Project preparati.on underway. J\r,ric•il t,.,.,.., :,qni'.;i:ry nf Gornmunicntions (Bank) 35.0 (Bank) (R) agricultural facfiities. Ports I - Assistance for Tanjun~ Prink port. Proj eel: prep11ration 1111derway. • Ministry of Public To be Irriga_tion VI~I - .Madiun rehabilitation Project preparation. underway. l-101·ks a11<.I Power determined and the Jatigede Dam. (Bank) DeveJ.,-,pment fo'inance Cu,,·,p,,11y (nM'T.NDO) Up to 50.0 (Bank) Rapindo III - Assistance for ind us trial development projects. Proj ,,ct preparati.on underway, • PT.N (N,; t f.on:il 80.0 Power VI - Additional a:.rnistance to PUI Project preparation unrlerway. V.leci:dcU.y Authority) (Bank) to expand its generation and transmisoion facilities. Miniotry uf Public Horka anrl Power To be determined (Bank) Water Supply II - Assistance for water supply systems in second group of seven cities. Project preparation underway. ·• Ministry of 35.0 (R) National Agricultural Extension - Appraisal missi.on scheduled for Agriculture (Bank) Improvement of provincial rural August, extension services, P.1', NIKKEL 50.0 (Bank) P~cific Nickel - Assistance for nickel mining project. Project preparation underway. (Joint or parallel financing possible.) • Pusri To be (R) Fertilizer III - Construction of Project preparati.on underway.· determined Pueri IV fertilizer plant, (Joint or parallel financing (Bank) possible,) · Procurement: Contracts for • engineering services are being finalized and some contracts for equipment having long de- livery time are being negotia- ted, Additional calls for tender are underway. All procurement is being conducted in accordance with Rank Guide- • lines. Retroactive Financing of some equipment and consultant services may be recommended. KOREA 15.3 Second Integrated Dairy Development Appraisal report being .con- • Ministry of (R) Agriculture (Bank) (Livestock II) - Expansion of present sidered, dairy develop~ent program at a total estimated cost of $24,7 million, (KOREA DEVELOPMENT 55.0 (R) KDFC V - To finance pert of KDFC's Loan approved by F..xecutive FINANCE CORPORATION (Bank) foreign exchange requirements for Directors July 15 and sl~ned (KDFC)) FY1975-77 operations. July 23. Seep. 1 for footnotes. • • • - 27 - • Member Country, and Borrower or Imelementins -Agenci _!/ Amount 2/ and Probable Lender Project]_/ Stage of Processing and Action on Procurement !!_I KOREA (Cont'd) Korea Port To be Port Development II - Improvement Awaiting completion of feasi- Authority (proposed) determined of major ports. bility study. • Ministry of_ Construction (Bank) 90.0 (Bank) (R) Highway III - Construction and paving Appraisal report being prepared. of road lengths selected on the basis of studies financed under the first highway project. Ministry of To be Okseo Area Development - To develop Awaiting completion of feasi- • Agr:!.c.11lture and l' 1_,sh.-,ry determined (Bank) about 50,000 ha in the lower Geum river basin and part of the adjacent M11.nr,yong and Dongjin basins. bility study • Ministry of To be (R) Watershed nevelopment - Integrated area Appraisal mission _in the field. Agriculture and determined development consisting of irrigation, Fishery (Bank) erosion control, and pasture, forestry, fishery and community development in • ·National Agricultural Cooperative Federation To be determined two watershed areas • Agriculture Credit II - To finance a portion of the NACF's farm credit pro- Project preparation underway. (NACF) (Bank) gram. (MEDIUM INDUSTRY BANK 30.0 Small and Medium Industry - To finance Appraisal report being {MIB)) (Bank) a portion of MIB's foreign exchange prepared. • Min:1,stry of Agriculture and Fishery and To be determined (R) requirements for 1976-77 operations • Rural Infrastructure Project - To finance a number of sub-projects in Appraisal mission in the field. Ministry of Construction (Bank) support of the Sae Maeul (new community) movement, including rural water supply, :~ rural electrification, firewood planta- tions, rural road construction and • Ministry of To be (N) maintenance_, minor irrigation, and cropland reclamation projects. Urban Development - Upgrading of low Project preparation underway. Cons true ti oil determined income group housing in Seoul, (Bank) Ministry of To be (N) Education IV - Upgrading of secondary Project preparation underway. • Education determined schools, teachers training, vocational (Bank) training institutes, and health and management education, Korea Development To be (N) KDB II - To finance a portion of KDB's Timing of project depends on Bank (KnB), determined foreign exchange requirements. KDB's rate of commitment of (Bank) previous loan. Ministry of Agriculture To be Yong San Gang II - To expand the area Completion of feasibility study • ~nd Fishery determined (Bank) developed in the first phase project (LN 795/CR 283 KO) and provide flood control through construction of an expected in late 1975 . estuary sea-dike, To be (R) Program II - To finance selected July/August supervision mission determined industrial imports. Program I (1094-KO) will begin (Bank) consideration of possible similar • financing in FY 76 . Seep. 1 for footnotes • • • - 28 - Member Country, and Borrower or Amount '!:_/ and· Probable Stage of Processing and • Implementing Agency]_/ Len,ler Project'}_/ Action on Procurement!!._/ MALAYSIA (Bank Pertanian) 11, .o (Rank) (R) Ap;rkul tnral Credit - Long term credit for oi 1 pnlm development and agro- ! nclt1s tr1 es .. Loan to be postponed by approxi- mately 2 years at Bank Pertnnian'a reCJue~t. • Kuala Lumpur 20.0 Kuala Lbinpur Sewerage (Stage I) - Appraisal report hel.ng prepared. Municipal Govermnent (Barik) Additions to and improvement of sewerage system within the Federal Procurement: Cornrnl t;cint 's con- territary. The p1·0,1ect would extend tracts for detailed design and sewerage service to an ·acJdit-f.ona 1 200,000 people. Total cost estimated at $6/1 million. mana~ernent are expected to be ~igncd hefore the proposed l~an is approvP.d. Retroactive finan- cing of ahout $30,000 may he • proposed. Public Works 50.0 llighway!:l III - Construction and improve- Prcapp,-;c1fsal m-fssto11 scheclul.ed for Department (PWD) (Bank) ment of two roads totalling about 130 Sept.,mher. miles in cast and west Sabah; 50 miles of Federal Route I to the north and south of Ipoh; provision for feasibility studies and detailed engineering for • future road projects plus possible assistance in highway maintenance. Ministry of Public 25.0 (R) Urban Transport and Traffic Dispersal Appraisal report heing prepared. Works, Kuala Lumpur (Bank) II - Improvement-of public transport in Municipal Government, Urban Development Kuala Lumpur metropolitan area; includ- ing procurement of traffic control Procurement: Retroactive financing of up to $1.2 million •• Authority equipment, construction of a husway to he recommended. and dispersal facilities from Federal Hf.ghways I and II·, improvement of street intersections and provision of bus priority lanes. 15.0 (Bank) (R) North Kelantan - Rural d~velopment pro- ject, assisting smallholder farmers by providing production inputs and Project being prepared, • infrastructure development particularly for irrigation and feeder roads. Sarawak Land Development To be (R) Sarawak Agricultural Development - Deleted from Lending Program Authoritv and the State determined Development end settlement of virgin at the request of the Govern- Department of Agriculture (Bank) lends; processing facilities for palm oil; improvement of existing small- holder agriculture and establishment ment. Project i9 expected to be financed by the Abu Dhahi Fund for Arab Development. •· of extension and distribution services. Ministry of Education 2s.o· (R) F.,luc;cition IV - Project w-f.11 include Project being prepared. (!lank) rural primarv schools, adult education, industrial skill training. (National Electricity Board (NEB)) 30.0 (Bank) -Power VII - Final stage extension of Part Thermal Power Station (360 row); Appraisal report being prepared. • 132 kv transmission line from Ma_1adee Switching Station to Kota Tinggl.; extension of 11 kv distribu- tion system to two ·rural areas; and consulting services for a rural elec- trification study. Total cost is estimated at S1~6 million. • Seep. 1 for footnotes. • • - 29 - Amount JJ • Member Country, and Borrower or and Probable Star,e of-Processing and Implementing ·Agency 1_/ Lender Project]__/ Action on Procurement ii MALAYSIA (Cont'd) (Sabah Ports To he Sabah Ports II - Exp11nsion and improve- Pr.-,_; ect to he· prepRred by Author! ty) cletennined ment of port facilities. Government nnd cnnsultnnts, • (ll11nk) To be determined Kuching Sewerage (Sarawak) - Expansion and improvement of sewe rap,e sys tern. Project to hf> prepared hy Government ai1d consultants. (Jlank) Ministry of To be Ar,ricultural Extension/Seed 1-!ulti- Project to be prepared by Agriculture detennined plication - Strengthening of extension Govermnent with assistance from • (Jlank) To be (R) services and facilities for seed mul- t1pl.101i:ion. Urban development - Sites and services FAO/IIIRD Cooper11tive Pror,rmn. Project to be prepnred by determined and public transport for Kwantan. Government and com111l t,ints,. (llnnk) PHILIPPINF.S • National Irrigation 42.0 (R) Irrigation IV - Phase I of Magat River Loan approved by ExP.cutive Administration (Bank) multi-purpose irrigation and power in Directors on July 22. Cagayan Valley, consisting of rehabil- Selection of consult11rits for itation of existing irrigation systems feasibility study in progres~. and construction of new irrigation facilt ties for a total area of 75,000 ha. Project cost is estimated to he $A4 million, of 'Which $29 million will • Department of Puhlic HiP,hways (DPH) 7'i.O (llRnk) (R) be foreign exchange • Highways III - Rehabilitation of ahout 520 Ian. of national highways; improve- IINDP fin11nced feasihilf ty studies, covering 11bout ment of about 200 Ian of feeder roads in 1,000 km and for which Jlank tuzon, Vizayas and Mindam10; financing is Executing Agency, completed. of maintenance equipment and technical Final report being prepared. assistance to the DPH. Total project Detailed engineering now under- • cost is estimated to be $137 million, with foreign exchanr,e costs of ~75 million. way. Pre-apprais11l scheduled for SeptemhP.r, 1975. riPp11rtment of RO.O Highways IV - Major improvements of UNDP financed feasibility Public Highways (DPH) (llank) about ~00 Ian of national highways and studies, covering about improveme.nts of about 200 km of feeder 1,000 km and for which R11nk roads in Vizayas and "1in r1,1 u rr!.r:e,i (nr,r) {Bank) development of beef cattle, pig and poultry farms by smallholders through sub-loans made by DBP. • Di,.v,;lop111e11t llonk of 30.0 Inter-island Shipping - To assist in Project preparation underway. the Philippines (DBP) {Bank) financing loans to private shipping companies for acquisition of new ond used· ships, and major repairs and ileparl:,ncnt of. Educatlu,1 50.0 (Bnnk) (R) conversions of existing ships. Education III - Expansion of elementary and secondary educational facilities, Appraisal report beinp, prepared. • with emphasis on textbooks production, technology, teaching, and teacher training. A smaller loan is likely. Natfonal :i:rr:f.ga tion Admlnistration 35.0 (Bank) (R) Rural Development II (Chico irrigation) - Construction of diversion dam on Chico river; gravity-irrigation of approximately 25,000 ha. of presently niscussion with Government on feasibility report· schedule·d late August. • rainfed irrigation land suffering from insufficient rainfall; improvement of 58 km of provincial road; feasibility .....study of 130 Ian of national highway for inclusion in the prop5sed fourth highway project; monitoring procedures of all Bank-assisted irrigation pro- jects in the Philippines. • Department of 20.0 (N) Education IV - Assistance for rural, Project preparation underway. Ed,;cation (Bank) non-formal education, farmer and ex- tension training and for formal agri- Department of Natural Resources 6.0 (Bank) cultural training and research. Forestry I - Assistance to Government to finance soft and hard wood planta- Government preparing the pro- ject with assistance of FAO/ • tions along agricultural fringes, IBRD Cooperative Program. water-shed and gullies in Upper Pampanga (Luzon) and Bukidnon area (Mindanao), National Power Corporation 80.0 (Bnnk) (R) Power VII - Chico River hydroelectric project and associated transmission, Feasibility study delayed clue to difficulties of gaining acce,rn to site. niscussions with • Government underway. Development Bank 60.0 Development Finance Company OBP II - Appraisal report being prPpared, of the Philippines (Bank) To assist in financing medium and long term loans for industry by finan- {DBP) cing costs of imported capital equipment, Government has engaged consultants • 30.0 (R) Fertilizer Plant - To produce ammonia/ (Bank) urea with capacity of about 900 - 1000 to complete preparation of the tons of ammonia P.O., and about project, (Joint and/or parallPl 1500-1700 tons of urea ·P.O. Total financing possibilities beinr, cost about $200 million, including explored.) about $120 million in foreign exchange, • Seep. 1 for footnotes. • • • Member Country, and Borrower or Implementing Agency!/ Amount 2/ and Probable Lender Project]_/ Stage of Processing and Action on Procurement!!_/ PllILIPPINES (Cont'd) Central r.ank nf the 30.() Agriculture Credit IV - Provision of Central Bank is preparing the • PM l ~ppi rn~a (Bank) medium and long term credit by the Rural Banks and Savings and Loan Associations to farmers and rural entrepreneurs to finance investment pro.1ect • in farm mechanization and related facilities and equipment, coastal and inland fisheries, small scale livestock development and cottage- • Department of Tour irvices, .Project cost e1Jtin1ated at about $210 mlllion with 42% foreign exchnnP,P., 4 .(, Northeast Livestock Development - • Ministry of (R) AppraiRal r"port under con- Ar,r1.culture (Bank) Dev.elopment of common grazing lands sideration. mi.xed farming; livestock station expan- sion; dairies; vaccine production; Procurement: Retroactive flnnn- technic,il asoistance. Total project cing uprc;-ns,ono m.,y he recom- cost estimnted at $10.8 million, mended. Hinistries of 21. 0 (R) Northeast Rura 1 Development - Government invited to negotiate. Interior ancl (Bank) Infrastructure inv.,Rtment in the Agriculture and Provincial Electri- city Authority · northeast provinces of ThailAnd; includinc v_illagc access roAds, water supply, rural electrification, and agric~ltural research for upland • crops and related extension services. Ministry of 12.0 (R) Education IV - Project expected to ·Negotiations postponed at re- Education (Bank) include assistance for rep.ional adult quest of Government; appraisal education centers, and rural diversified report being revised to reflect secondary schools. modificat1.ons to project re- quested by Government. •• (INDUSTRIAL ESTATES 10.0 (R) Industrial Estates I - Construction Government invited to negotiatP.; AUTJIORI'IY of Thailand) (Bank) of a 160 ha industrial estate at difficulties acquiri.ng land Minhur1 near Bangchan and· technical have delayed the start of nero- assistance. Total project cost about tiations, Ministry of Agriculture Up to 45.0 $17.5 million. Irrigation VIII - This project is the result of the mer~er of the Chao Phya Feasihility study being made by Government and crmsnltnnts • (Rank) II and Mae Klong irrigation projects. financed under Cr. 179. Total project cost will depend on pro.1 ect scope yet to be determined. Ministry of Agriculture Up to ·1 s.o (!lank) F~restry Development I - Rehabilita- tion of forest lands and industrial plantations, Identification mission repori under considerRtion. Prepnrntlnn arranr.ements ,ltscussed wt th Go~er~ent in lnte July. • Ministry of 50.0 · (R) 'imallholder ruhher replantinr, program. Appraisal report being prepared .. Agriculture (ll;mk) (TELEPHONE ORGAN! ZA TION OF 'lllAifANJ) (TOT)) 26.0 (Rank) Telecommunications II - Phase II of TOT's 1972-79 investment program includ- inp. instnllation of cable, suhscriher facili ti£'s, trunk switching cquipme.1t Appraisal report hei ng preparen_~i.enc:r _I/ nnJ l' rohah le i.ei1dci:- St.ige of l'rocessing and Action oii l'rocurrment 1,1 • JlA.'lGl;:ADESII (Cont'd) Dacca Water ::md is.o D11cca w.,tcr [I - 1'xi:cnsion of water A ptei inii nary s i:udy tn,li c-ated • Sewerage Authority ( [DA) and s1:wei"r1ge sys tcm~ that the 1eat" r ,rnµply comrinneni of the second 1irojcct iJOulcl consist prlninrliy of additinn.,J gtounclw.,ter nhsi:rnctlni1 .1nii uisti:lhut inn faci i l ti PS. llowrvri·, turther testing is required for confirmai:ion, nftcr which the proj ei:t cmiid be planned aild des Lgned. I DA has req 11es trd GoVcrnmerit 's vJcws on i10,.i thf' pi.inning ,rnJ ue,d~n plrns<' 1m11ld he executed• • Ministry of Food 15.0 Foodp,rnin Stor11ge II - To strengthen ~reject heing prepared by (IDA) lnlanu stor:agc system for ,l.lstrihution consultants fi nnncru under and domes tic procurement. first foodgrnin storage credlt, Ministry of Forest, Fisheries and Lilies tock ·Up to 15.0 (IDA) Fisheries I - Possibiy inciudinp, reha- hi1it11tion ot µonus 11nd lakes iri the Western region; plus iiai:chei-y fociii- · ttes and other supporting iriff~~ Project prcpnriltion im_rE_j_e_':_!:_ }_/ Action_nn Proc11rt:'ment 4/ BANGLAOESI_I_ (Cont I d) Planning 75.0 Imports Credit V - Provision of foreign Timing dependent on utilization Commission (IDA) exchange for procurement of ag ricul- of previous imports credits. • Bangladesh Shipping Corporation, 4.6 (IDA) tural inputs and items for industry • Supplementary Credit - Inland Water Transport Project - Credit 424-BD Draft amending agreement be1ng reviewed by Government. Chittagong Port Trust contains an allocation of $1.4 million and Eastern Refineries for restoration of the. damaged off- Ltd. shore oil terminal. Later investiga- tions, however, indicated the terminal • could not be economically repaired • Provision of two lighterage tankers being considered for supplementary financing. Previously conceived in- stallation of a tanker forebody deter- mined not feasible after review by miss ion. • Bangladesh Up to Shallow.Tubewells - Instailation of Preparation mission preparing Agriculture Deve_lopment 20.0 about 10,000 1/2 cusec wells to irri- report. Corporation (IDA) gate a total of about 150,000 acres of land in the Northwest Region. Bangladesh Water To be (R} Drainage and Flood Control I - Identification report being Development determined Construction of minor flood prepared. r, Board (IDA) embankments and improvement of natural drainage and construction • of sluices in less deeply flooded areas nationwide, BURMA Minerals Developnient Up to (R) Mining - Rehabilitation and expansion UNDP feasibility sturl~ being Corporation (or tO.O of tin/tungsten mining facilities prepared. Appraisal tentatively Myanma Tin Tungsten (IDA) including beneficiation, planned for bctober/Noveniber • Corporation) Ministry of Agriculture 7.5 (IDA) Livestock I - Livestock, dairy and pasture development, supply of breeding 1975, Appraisal report being prepared. stock, dairy processing facilities, vaccine production, veterinary and extension services, research and technical assistance • • Ministry of Agriculture About 25.0 (IDA) Nyaunggyat Dam Irrigation - Construct- tion of a major dam, rehabilitation of existing irrigation system on 80,000 Project preparation underway by FAO/IBRD Cooperative Program. (Given large size of project, acres and construction of new irriga- co-financing will be required). tion system on 50,000 acres in upper Burma • • See p. 1 for footnotes • • • • . - 37 - Hcmber Country, and Amount 2/ Borrower or Implementing Agency]__/ and Probable Lender StaRc of Processing and Action on Procurement 4/ • _BURMA (Cont I d) Ministry of 15.0 (R) Lower Burma Paddy I - Rehabilitation Preparation underway by Govern- AJ1ritu.lture (IDA) of abandoned land by means of re- ment and IOA. Appraisal sched- construction and rehabilitation of minor flood embankments and improving drainage and reclamation, provision of pumps, introduction of highyielding uled for October/November. • varieties of paddy, provision of agricultural inputs and strengthening of supporting services. MiniRtry of Ag,riculturc & Fore:.; ts Up to 25.0 (IDA) Forestry II - Rehabilitation and improvement of timber extraction operations. Consultants, to undertake feasibility studies, being selected. • Government at 5.0 Ports l-I - Stabilization of navi- Part of consultant's Rui:,aa (IDA) gational channels for Rangoon Port, report under review. other port improvements including Full report expected equipment and training of local by end August. Mi11istry of · Mines To be Determined staff. Fertilizer Industry - Manufactu- ring of urea fertilizer To be identified under UNDP financed study. • (IDA) -·· ....... ·, •• •.• C. ,•.-· ' Rural Electrification ",57.0 (R),,. Rural Electrification - Financing of. Approved by Board on July 8, and Corp • and State (IDA) rural electrification programs of signed on July 23, 1975. Electricity Boards State Electricity Boards, with emphasis on energization of minor irrigation investments such as tubewells. Esti- mated project cost $114.1 million, in- cluding $30. million in foreign exchange. • 70.0 (R) Cormnand Area Development - Orissa - Appraisal scheduled for (IDA) First phase command area development November 1975. in various irrigation systems through- out Oriasa. 15.0 Integrated Cotton Development Appraisal report being prepared. (IDA) -~ Development and supply of certified cotton seeds, provision of plant • protection and extension services, research in cotton production, rehabili- tation of ginneries and establishment of oil crushing mills in two selected .areas of Maharashtra and Haryana States. Industrial 50.0 (R) IDBI II Development Finance Company- Appraisal report being prepared. Development (IDA) continuation of support for Govern- • 13ank of India ment-owned IDBI, which finances small (IDBI) scale industry. See p, 1 for footnotes. • • • - 38 - • Member Country, and Amount 2/ llorrower or and Probable Star,e of Processing and I_!!!£1ement~ Agency 1/ Lender Project _J_/ !',ction on Procurement ~_/ IND1A (Cont'd) Post-and Telegraph 80.0 (R) Telecommunications VI - Continuation Appraisal tent a ti vcly scheduled • Department (IDA) of Teleconnnunications V to support P & T ,·s investment program under the Fifth Plan including local and long distance exchange facilities. for October 1975. State of Andhra 55.0 (R) First phase of command area development Appraisal mission in field. PTadesh (IDA) for various irrigation schemes in Andhra Pradesh • • State Electricity Doards 150.0 (IDA) Power Transmission IV - To finance pa rt of invea tment pr_ogram for power transmission in selected states. Appr11fsal report being prepared. Stat~ 0f IJtt;ir 40.0 (R) Water supply and sewerage for selected Scheduled for Board .pr!'sentation Pradesh (IDA) urban and rural areas of Ut tar Pradesh. in Auguot. Estimated project cost $75 million in- • cluding $11 million in foreign ex- change. Procurement: Retroactive finan- cing not exceeding $.5 million for consultants' sP-rvices. being considered. Indian Railways 110.0 (R) Railways XIII - Contiriuation of ·scheduled for lloard presenta- (IDA) support for Indian Railways invest- tion in August. ment program • • Stat·e· of Jammu and Kashmir 30.0 (IDA) (R) Agro-industries~ Construction.of pack- aging and processing facilities for fruits and vegetables with export or Project preparation underway by State Government, import substitution potential; pro- vision of credit for small producers, on-farm development. • 70.0 Coastal Shipping (Coal)- Development Awaiting project submission (IDA) of handling and transport system to by Government. meet coal requirements of selected power stations. 95,0 Fertilizer - To help meet financing Appraisal report being prepared, (IDA) requirements for improved utilization of existing capacity. Procurement: Advance contracting • with the possibility of retro- active financing being considered for selected project elements. 25,0 Nutrition - To support nutrition Awaiting project (IDA) development program.of submission by Government'. Government. 150.0 Power - Development of super Awaiting project submission • (Bank) 50.0 (IDA) (R) thermal power station • Eastern Region Foodgrain - Development of foodgrain from Government. Sector review mission scheduled for September production potential in Eastern 1975. Indian States . • See p. 1 for foo_tnotea; • • - 39 - Member Country, anrl Amount 2/ Borrower or j~plemcnting /\gencx_ }_/ and ,;~obahle Lenq~L--.-- · !'_r_oj_ect_ 3_/ Stage of Pn•ce_sr.1ng anq l\cqon Pri_l'rocurc,mcnt 4/ • IN1:>_IA (Cont'd) 40.f) (R) Trge Drnm, - Reh'!qi)iH~ion apd re- Appraisal sche~uled for p1)/)) pLmrt11g Rf n~hh~r '!;,~ coconuts; Oc~()her, 1'175. 40.0 (R) fanni ryg improvements for small- holders. Marine Fisl1erfcs I - Development of 1'ro.1~ct preparnpon sclwd11led • (rnA) harbors !1!1~ Pf!tn Dev9lor.ment - ~MJic Pr~~ei::t preparation unde~,ay. and Madras Metropolitan (IDA) ur!,an serviC!!S i11cluding water supply Development Auth~rity and sewerage, transportation, and sites and services. Stat~ 9f We~t B~ngai and C~lc~tta Metropoli- tan Dev~lopment Authority (CMDA) · 50.Q (IDA) Calcutta Urban Pev~lopment ~I - eon~ struc~io11 of W<\ter suP,ply, sewerag~, transport facilities and other urban iryfrast~itcture ~ ide11tified in the !lroject preparation underway._ •' CMDA program. 70 .o Seeds and Research - Production of rroject under preparation by (IDA) high yielding varieties of seeds, GOI/IDA. Report tentatively 5.0 particuiaay of s~~ds for food grain prod[!~tion. · Forestry - Utilization of existing scheduled for August 1975. Report of project preparation • nnA) n,iturn+ fore~try res~..;rc~ and re- assistance mission indicates _planting with pi!le an4 possibly no prospect for major pro_Ject eucalyptµ!!. · inves ~ment at th ls ~ ime. Con- sideration is being given to • possible Ul'IDP or IDA financeil technical assistan!=e. Agricultural Refinance 10!).0 Agricultural Refinance Corpora~ion App):'ais~l te11tr~lvely RChedµled Corporation (IDA)· (ARC) Credit II - Financing of for Fall 197~, but dependent a portion of ARC's len~ing program ·up;,n progress of ·ARC I. for on-farm investment. 40.0 (N) Marine Fisheries 11 - Development of (IDA) harb;,rs· and pr~ces~ing· f~ciliti~ in selected states; pr9vision of credit for small scale fishermen, • Seep. 1 for footnotes. • • • - 40 - Member Country, and Amount 2/ • llorrower or and Probable Stage of Processing and ~lementing Ar,ency J_/ Lender ---- !'lction on Procurement'!_/ NEPAL Ministry of Public 12.0 Highways II (Feeder Roads) - Con- Government in process of select- Works and Transport (IDA) struction of road connecting Tulsipur ing engineering consultants for · • in the Hills and the Terai. and adjoin- ing feeder roads, highway maintenance equipment, and trainlng, constructlon of additional ropeways and suspension project preparation . Procurement: Ret roact i_ve f in1m- cing of detailed enr,!neering may bridges in Hills and technical assist- be proposed. ance. Project may also include agri- cultural development elements. • Minis try of Food, Agriculture and Irdgation Up_ to 10.0 (IDA) Rural Development - Livestock, irri- gation, erosion control and rural i.n- frastructure facilities. Appraisal report beinr, prepared . Ministry of Food, 8.0 Irrigation II - Groundwater project Feasibility study being Agriculture and (lDA) for ti1e irrigation of 15,000 ha nf!ar prepared by consultants. Irrigation Bairawa in Lumbini Zone. Appraisal mission tentatfvelv scheduled for November. · • Ministry of Water and Power 18.0 (IDA) (R) Kulikhani Hydroelectric Power - Con- struction of dam on Kulikhani River about 30 km southwest of Kathmandu and a two-unit (30 MW each) turbo- Appraisal report being prepared. (Co-financing arrangements with Japan, UNDP and the Kuwait Fund being reviewed.) generating pQ1,1er station. Agricultural 7.0 Agricultural Credit through Nepal Agri- Feasibility study being prepared • Development Bank Ministry of Food, (IDA) s.o cultural Development Barik (ADBN) - to finance minor irrigation schemes. Cereal Seeds - Integrated project by ADBN, with possible aqsistance of either FAO/CP or U'.'IDP financed consultants. Project document for feasibility Agriculture and (IDA) including adaptive research, study and terms of reference Irrigation multiplication, storage, processing nearly finalized and will be and credit. discussed and agreed with • Government during the Annual Meeting. PAKISTAN (PICIC) 30.0 (R) Development Finance Company IX. Deferred one year as PICIC has (Bank) requested ADB for financial assistance • • 20.0 (IDA) Education III - Includes assistance for agricultural training, teacher training, and non-formal education. Appraisal report being prepared. 25.0 Ports V - Construction of additional Pre-appraisal tentatively sche- (Bank) capacity to handle growth in water- duled for November 1975, dependin~ borne co11DTierce. on implementation of current projects and Government plans • 10.0 (IDA) Livestock. for developing Port Qasim • Project being prepared with assistance of FAO/IBRD Cooperative Program preparntI-on mission. Appraisal tentatively scheduled for October • • See p. 1 for footnotes • • • - 41 - M.:,mber Country, and Amount 2/ Borrower or Implementing Agency!/ and Probable Lender Stage of Processing and i\ction on Procurement '*_/ • Pakistan l5,() Railw_ayli ){ - Assista11ce t11 financing Timing of apprnisal will depend ~niliiuy . (PR) (Ban~? portion of ?R's fifth five-year plan, on suitable ar.rcement between PR and the Bank on openttional improvements anJ PR's propose,! investment program. • 20.0 (R) Lahore Water Sµpply and Sewerage II - Appraisal report being (IJ?A) Water.supply ~priui CQmprising tube- prepared. Followup appraisal wells, chlorination plant, main grid scheduled for early September. and distribution pipelines; sewerage and drainage works including pumping stations. • Induetr1al Dcvel- 20.0 (R) IDBP II~ For ontending to various Timing of appraisdl will depend c;,r::;:;rit Bank of (IDA) manufactt1ri11& industries. upon utJlization of a loan from Pakts~a.i (IDBP) ADR expected th :Is fiscal y<>ar. • 20.0 (R) Highway III~ ~mproveme11t of GOP considering proposals from .cin~> various roads 111 Pakistan. consultants for project preparation, Agricultural 20.0 ADBP IV - To continue to finance further lending dependent on Development Bank · (iDA) ~nlending t~ farmers under· tubewell measures to improve financial of Fakistan (ADBP) development and farm mechanization position Of ADBP, prpgram, 24,0 (IDA) Seeds - prpdµction, proces~ing, storage and distribµtion of certified seeds •.. Appraisal report un~er consideration, Negotiations e~pected in September. • \-later an4 Power 45.0 (R) Project will include 500 KV Lyallpur- Appraisal report µnder Develµpment Authority (!lank) Multan-Guddµ transmissio11 li11e a11d consideration, (WAPDA) associated sub~tatfon, Total project cost will be approximately $103million. Procurement: Retroactive-finan- Water and Power Development Authority 10.0 (IDA) (R) Khairpur II - Irrigation/drainage project; w11i include enlargement cing proposed for consultants. Appraisal report under preparation. Follow-up mission • (WAPDA) of canals in an existing irrigation in the field. system and construction of tile drainage. Rural pevelopment Wing of Federal Ministry of Agriculture and Provincial Governments 15.0 (IDA) (R) Rural Development I~ Project may in- clude general support for integrated rural develop~ent program and special~ ized agricultural production programs Preparation assistance mission visited Pakistan in March/April. Government preparing applica- tion for IDA financing. • in Azad Kashmir. Karachi ~!unicipal Corp, 5.0 (R) Urbanization l - Project will in- Preparation mission visited (KMC) and Government of (IDA) volve upgrading 3-square-mile Lyari Pakistan in July. UNDP sup- Sind District of ~arachi with population of about 500,000; will include water supply, sewerage and solid waste dis- posal components, road improvements porting pre-investment studies with Bank as Executing Agency. Apprai.sal scheduled for October. • and community services. See p. 1 for footnotes. • • • - 42 - • Member Country, and 801·rower or Implementing Agency 1/ Amount 2/ and Probable Lender Project ~/ Stage of Processing and Action on Procurement !!_I PAKISTAN (Cont'd) Water and PiMer 8.0 (R) Tarbela Development Fund - Special Approved by Executive Directors • Development Authority (WAl'DA) (FAUJI-AGRICO (IDA) 50.0 contribution for repairs and addi- tional remedial works, Fertilizer plant in Punjab Province on July 22, 1975. Pre-appraisal mission in field. FERTILIZER CO,) (Bank) with capacity of 1725 tons of urea per day. 35.0 (R) Program Credit in support of agri- Report under preparation. • (IDA) 15.0 (IDA) cultural and/or export industry development, Forestry - Project may include extraction of Himalayan pine and GOP considering project proposals prepared by recent encouragement of primary forestry FAO/IBRO identification mission. industries in depressed hill areas. • SRI LANKA Ministry of Irrigation, 15.0 (R) Irrigation Rehabilitation 1/Mahaweli- Appraisal report under PiMer and Highways, and (IDA) Ganga Irrigation II (Phase I) - Reha- preparation, Project to be Mahaweli Development bilitation of existing irrigation split into two projects, (i) Board eyste1D11 in the Mahaweli Ganga area, Irrigation Modernization I, and (about 30,000 acres) - and Phase I of (ii) Mahaweli Ganga Development Stage II of Mahaweli Ganga Irrigation Project II (Phase I), Scheme (additionai 26,000 acres), • Ministry of Agriculture 20.0 (IDA) (R) Agriculture Development Credit - Pro- vision of foreign exchange for essen- tial imports designed to increase Appraisal report under preparation. agricultural production, Ministry of Up to Agricultural Credit. Identification mission Agriculture 10 .o scheduled for Fall. • Ministry of Irrigation, Power (IDA) Up to 10.0 Drainage and Land Reclamation II - Construction of flood Project preparation scheduled for Fall, and Highways (IDA) embankments and reclamation of about 15,000 acres of ' marsh land along Southwestern coast • • Mirtistry of Agriculture Up to 15,0 (IDA) Tea Diversification - Development of marginal tea lands in the mid-country, Project being prepared by the Government with FAO/IBRD Cooperative Program assistance. Seep, 1 for footnotes • • • • • - 43 - • Memher Country, and Borrower or Implementing Agency 1/ Amount 2/ and Probable Lender Project]_/ Stage of Processing and Action on Procurement !!_I V. EUROPE, MIDDLE EAST AND NORTH AFRICA • ~-F~).lANlS"iAN Afghan Electricity 8.0 (R) Power - Generation facilities (gas UNOP a~reed to finance prc- Authority (IDA) turbines) parat.i.on of tender documents: however, formal ar,rcement still to be finalized. Appraisal report is being prepared. • 1-l'tnis try of Ar;rirult•ire and Irr-! gation 15.0 (IDA) Livestock II - Rural development faciiities and services for improve- ment of animal health and production techniques in Western provinces, and Consultants are being chosen by Government to complete the feasibility studies for this project. rural development components to he identified. Ministry of 5.0 Education - To be identified in context Government reviewing its sector • Education (IDA) of reviewing IBRD/Unesco Cooperative Program sector report and Government's sector policies. policies before further discus- sions with the Rank to take place sometime during the Fall. Industrial 4.0 (R) Industrial Development Bank II - Con- Processing schedule depends Development (IDA) tinuation of financing the foreign upon progress of IDRA I Bank exchange needs of the Industrial project. Development Bank of Afghanistan {IDBA), • Afghan Civil Av:f,ation and Tourism fi.O (IDA) Airport - Construction of a new.airport at J..ogar near Kabul. Total project costs Draft feasibility report being reviewed by Government. Authority about $28 million, foreign exchange $19.5 million, Road Construction 9.0 Upgrading of about 120 km. Roads sections for feasibility • and Maintenance Department (IDA) of gravel roads to bitumen standards, Total project costs about $14 million. study being selected by Govern- ment. Ministries of To be Establishment of a national Project scope being determined Agriculture and determined grain storage and marketing system by Government. of Planning (IDA) For participation in a fruit and vegetable export project, • ALGERIA (SOCIETE NATIONALE About (R) Construction of new cement plant at Appraisal report heing prepared. DES MATERIAUX DE 45.0 Saids, supporting civil works and CONSTRUCTION) (Bank) transport equipment, and technical Procurement: Turnkey contract assistance, for cement plant has been awarded . • Ministry of Higher Education, Ministry of Industry About 45.0 (Bank) (R) Education II - Construction and equipment of institute of technology at Tlemcen; technical assistance. Appraisal report under preparation. Banque Algerienne 40 •. 0 Industrial financing. Loan approved hy ·Executive de Developpement (Bank) Directors on June 26. • Seep. 1 for footnotes • • • - i,4 - Member Country, and Borrower or Implementing Ag_~r and Works ongoing project, started ln July 1975. (ELECTRICiTY AUTHORITY OF CYPRUS) 15.0 (Rank) Power V - Rehnhilitation and expansion of distribution system; and completion of village electrification program. Project likely to be delayed. Reappraisal requlrecl. • ~GJPT~RAB REPlTllLIC OF Ministry of To he (R) ARricultural credit, including Preappral.sal riiis1dnn's flncllnr.s Agriculture determined production of fruit and vegetables, beJng revieweJ; appraisal • (Rank) storage, processing and marketing, and scheduled for Ottnher. associated credit and extension facilities. General Organization To be Possibly for exploitation and process- Project tn he identified. for Indus tria 11 za t ton determined ing of rock phosphate. Studies rrqui rerl have been (IIJA) initiated hy Govr,rnment and are in ptogrc>ss. Seep. 1 for footnotes. • • • - 45 - • Memher Country, and Amount 2/ Borrower or And Prohahle Stage of Prncess1n~ and Implementing Agency 1./ Lender Project]_/ Action on Procurement,!!_/ F.GYPT, ARAB REPUBLIC OF (Cont'd) Rnnk of 25.0 (R) nevelopment Finance Company II. Credit signed July 30, 1975. Alexandri;i (IDA) • General Organiza- tion for Spinning and Heavin)? To he · determined (Rank) (R) Textile Rehnhilitntion - Phase I of rehabilitation and modernization of sclectr.d textile And garment Project preparation n1fssio11 visited Cairo encl .July. Sector survey hv consultnnts also in producti.on complexes. prosress. PrcnpprnfRnl m1Nsfnn scheduled for Octoher. Alexandria Port To he (R) Improvement and modernization of Appraisal mission currently ln • Authority determined existing port facilities at the field, (Bank) Alexandria Port. Ministry of To be (R) Education project to be determined. Mission visited Egypt March/April Education determ:l.ned to study sector for preliminary project identifi.cation. Project preparation mission scherl11led for October • • Ministry of Irrigation/ Egyptian Public Author! ty for Drainage To be determined I.feed Control - Supply of equipment and chemicals for control of weeds in irrigation and drainage canals throughout the country to improve Project identified by recent mission, and now beinl! preparC'd by Government. · efficiency of irrigation and drainage, Ministry of Irrigation/ To be (R) Nile Delta Drainage - provision of Pro.1ect under preparation by Egyptian Public determined pumping stations, rehabilitation Government. • Authority for Drainage of main drains and provision of tile and open drainage for up to 1 million acres in the Nile Delta and Upper Egypt. with soil improvement treatment where necessary ae a follow-on to the ongoing Nile Delta and Upper F.gypt ,. drainage projects, • Ministry of Industry/ Ministry of Agriculture To be detennined {N) AP,ricultural and Industrial Imports - Financing of recurrent imports. to enable improved utilization of capacity in agricultural and industrial Project being prepared hy Government. Appraisal scheduled for Septemher. , sectors. GREECE • Land Reclamation Service of Ministry of Agriculture 40.0 (Bank) (R) East Vennion Irrigation - Irrigation in north central Greece for ahout 24.000 ha. Presentation to Executive Directors scheduled for AuRnst. 'Ministry of 30.0 Construction of selected road segments Further preparation being done Public Works (Bank) plus highway maintenance and technical by Goverrunent. assistance for transport planning. • Sewerage Board of Thessaloniki and Volos To be detennined (B,mk) Urban Sewerage Development - Main interceptors nnd treatment facilities for second and fourth largest cities in Greece, and related technical Project preparation underway, assisted by WHO. assistance. Agricultural Bank To be Agricultural Credit/Evros Regional Project preparation under of Greece detennined nevelopment. discussion. • (Bank) Seep • 1 for footnotes. • • "'46 - Member Country, and llnrro~~er or Implementing Agency l/ Amount 2/ and l'robable Lender Project '}_/ Stage of Processing and Action on Procurement~ • 1.l_~~~l}_t !!J JORDMI • Jordnn Electricity Authority s.o (IDA) (R) Provision of a third 33 MW steam elec- ·tric generating unit at the llussein Power Station (Zerqa) and related sys tern improveme·nt. Credi.t signed on July 7. (JORDAN POTASH 1.0 (R) Potash engineering credit for pilot Credit signed on July 7. cmn> Af!Y) (IDA) dyke testing, • Industrial Development 3.0 Medium Scale Industry, Appraisal to be determined Bank (IDA) following Government review of policy issues. ( JORDAN PIIC!:I'llATE To be (R) Expansion of phosphate rock mining Appraisal elate to be cleterminecl MT.NING COMPANY) determined operations; expansion of railway, in Hglit of progress of prepara- Ministry of (Bank) road and port facilities related to tion s tUnt.) • Housing and Hotel To be (R) CIH III - Hotel financing. Apprn J sn I scl1eduled for St>rtPml•i>r. nevelopment Bank determ:lned (CIII) (Bank) Ministries of Higher Education and of Primary and Secondary Education 30J) (llank) Education !II, Genera 1 erluca Hon mostly in rural areas, teacher train- ing, vocational and technicAl training ancl non-formal educal:i.on. Apprai~rnl report bPing prep.,red. • Water Supply Office To be Water Supply II. Project being prepared bv (ONEP) determlned Goverru:ient anc! consul tan ts. (Bank) (AGRICULTURAL CREDIT BANK - CNCA) To he determined (Bank) Third agricultural credit project, Project preparation undenoay. • Ministries of Public To be (R) Multipurpose dam and associated works Project preparation underw.,y. Works and of Agriculture, determined at Sidi Cheho on Oum-er-Rlia river, Government is seeking supplemeh- Electricity and Water (Rank) for power p,eneration, irrigation, tary external. sources of fln.ince. • Supply Offices (ONE industrial and potable water supply. and ONEP) Procurement: Advance cohttacting and some retroactive financinr for dam construction envisaged. OMAN Ministry of To be Education II Project to be identified and determined prepared with the assistance • Education (Renk) of the team currently being financed under first project. Ministry of To be Irrigation I Identification of project Agriculture determined depends on results of ground (flank) water study being carriPd out by several consultantR. Ministry of Development To be determined (Rank) Technical Assistance It Scope and size depends on results of first prn1ect currently underway. • To be determined To be Rural roads Project identification and determined pre-appraisal mission scheduled (Bank) for October 1975. ROMANIA (AC-RICULTURE BANK AND INVF.STHENT BANK) To he determined (N) Flood Rehabilitation and Protection Pro.1ect - Rehabilitation of extensi·•e Appraisal report being prepared. • agricultural, industrial and transport damage caused by July 1975 floods, and first phase flood protection works. Seep. 1 for footnotes. • • • - 49 - • Member Country, and Amount 2/ Rorrower or and Prohahle Stage of Processing and Implementing Agency!/ l.ender Action on Procuremen~ !!_/ ROMANIA (Cont'd) (AGRICULTURE To he (R) Rasova-Vederosa Irrigation - 65,000 ha Appraisal report is heing BANI<) determined irrigation scheme and related farm prepared. • (Rank) · development for production of livestock, maize, wheat, sunflo11er, vegetables and other crops, Processing components also under consideration. Total cost tentatively estimated at $165 million, including $66 million in.foreign exchange. • (INVESTMENT BANK) To be determined (llnnk) (R) Rtul Hare Rete:>:at - 349 MW hydro- electric power plant, dam and river diversions. Total cost estimate~ at $205 million with foreign exchanp,e Apprnlsal report is undnr prer.1r.1_r I on. costs of $50 million. (INVESTMENT To be Pulp end Paper - Integrated pulp and Projpct scope under d!scuA~fnn. HANK) determined paper production facility; total cost • (Rank) estimated at about $290 million with foreign exchange costs of about ~115 million. (AGRICULTURE To be Agriculture Credit II - Project· scope Project scope under.discusnlnn. BANK) determined to he determined. (Bank) • Investment To be Expansion and modernization of the Appra i Ra! tent at 1vely schee Educatf.on -, Improvement of basic Unes~o/IRRn CooperatJve Pronram Education Mtnistry of Agriculture determined (!lank) To be (R) taducat:ion delivery system. Agro-industry - Devnl.opment of inte- identifica~~on mission report being prnparcr!. Jdentlficntion mission • - Regio~al Development detennined grated production and procnssinr, scheduled for A11r,11st. Corporatlons (!lank) prnject~. Ministry of Agriculture To be (R) ·Forestry - Development of timber FAO/IBRO Cooperative Program - Center for the Develop- m!!ll~. of Forestry, Ministry of determined (Bank) To be (N) resources in the Santa-Cruz rer,ion, Airports~ Impr9v5~o~ts l!t remote identificati6n mission scheduled for early 1976, Preparation mission scheduled • Transportation. and determined facilities and air navi~ation aids, for-Aur,ust/Septemher. Communications (Bank) (Banco Nacional Do Desenvolviroento Economico 85,0 (Bank) (R) Development Finance Companies - finan- ing of State Development Banks for relending to small and medium-scale .Appraisal report being prepared .. • industries. (COMPANIA DE DESENVOLVI- 2).0 (R) Sao Francisco Valley D!!velopment - Loan schedulerl to he sinned MENTO DO VALE DE SAO (Bank) Construction of polders and installa- on August 4. FRANCISCO) (CODEVASF) tion of :!-rrigation arid-drainage pumping systems to protect ]2,000 hectares of flood plain land from the adverse effects of the changes .in the flow of • the Sao Francisco River caused by the building upstream of hydroelectric power fa~ilities at Sobradinho and Paulo Afonso. Total cost estimated (FERROVIA PAULISTA 7 5.0 (R) at $56.5 million of which $19.2 million in foreign exchange. Railways III - Rehabilitation and Nenotiations in pror.rrss. • f. .A.) (Bank) modernization of Sao Paulo State Railway Company. This project covers Procurement: Retroact1vn. two years of a· five-year plan and has financinr. (up to s100,oon) for a total cost of about $762 million technica:). aRsiRtance wi 11 hr • of which about $367 million in foreign recommended. excliange, Seep. 1 for footnotes. • • • - 57 - • Member Country, and· Amount '!:._/ Borrower or and Probable Stage of Processing and Implementing Agency 1__/ Lender Project 1/ Action on Procurement!!._/ "BRAZIL (Cont'd) Up to Nutrition - Support for development Appraisal report helnA prepared. • 20.0 {Bank) of national food ancl nutrition program, including rural extension, health services, foocl fortification, technical assistance and training. Total project cost estimaterl at $62 million of which about $20 million in foreign exchange. • (EMPRESA BRASILEIRA To be (R) Agricultural research for the Appraisal mission in .the ffelrl. DE PESQUISA determined Northeast, Cerrados and Amazon AGKOPECUARJA) (Bank) regions. (BANCO NACIONAL DA To be (I{) Water Supply and Sewerar.e II T - Project preparation underwnv. HABITACAO) determined Second phase of water anrl seuerar,e (Bank) program for State of Minas Gerats. (BANCO NACIONAL To be Water Supply and Sewer.'.11!,e IV - Pro.1ect prepnratlon unc1 .. n,nv. • DA HABITACAO) (BANCO NACIONAL DA determined (Bank) Up to Sao Paulo water pollution- control and water distribution Il.· Development of site arid ·services <:overnm_ent site ancl sr.rv Ices HABITACAO) 60.0 projects in cities {to be identi- policy helnA formulatrd. (Bank) fied). Up to Agricultural Development of lower Pro.1ect prenaration underway. • 30.0 (Bank) To be Sao Francisco Valley - second phase. Agricultural Settlement in Mato Project preparation underway. determined Grosso·. (Bank) Up to (R) Integrated Rural Development in Appraisal report being prepared. • 12.0 (Bank) State of Rio Grande do· ·Norte to consist mainly.of additional credit for perennial cotton produc- tion; expansion and strengthening of rural extension services, production field tests, training and improved health services. Total project cost estimated at $30 • (COMPANHIA SIDERURGICA 95.0 (R) ·million of which about $3. 7 million in foreii1n exchanl!,~. Second CSN Steel Project - Third Loan schcdul erl to be signed NACIONAL - CSN) (Bank) stage expansion of flat steel on August 4. capacity from 2.4 million to 4.4 million tons of raw steel. Total Procurement: Prcqualiffcatin~ project cost estimated at $1.9 of hidders has started. • billion of which $8]8 million in foreign exchange. (COMPANHIA SIDERURGICA 60.0 (R) Second Cosipa Steel Project - Third Loan approved by Executive PAULISTA) (J!!1nk) stage expansion of flat steel capacity Directors on.July 22 and from 2.3. million to 3.5 million tone scheduled to be sip,ned on of raw steel. Total project cost August 4. estimated at $785 million of which • $360 million in fore_ign exchange . Seep. l for footnotes • • • - 58 - -Member Country, and Borrower or Implemcnt:l.ng Agency!/ Amount 2/ and Probable Lender Project '}_/ Stage of Processing· and Action on Procurement!!_/ • .!!_KAZI~ (Cont'd) nam:p :1aclonal Do Up to (R) .Secondary and Feeder Roads - Construc- ApprajsnJ report belnR prepnred. DeG::"".volvimento Ec.:unvuti.co Centrois Eletricas 55.0 (!lank} To be tion and improvement of road9 primnrily to aRsist agricultural development. (R) : Northeast Power Distribution - Expnn- Project preparation mi,rnion in • llrasilelras S.A. . determined sion and upgrading of power distribu- the field • (8LRCTR0IlRAS) (Bank) tion network and increase in household connections for lower and middle income households in urban areas of Up to Northeast Brazil, Cepel high tension laboratory, Mendes Junior Steel Project - New non- Feasi~ility study beinp, reviewe~ 1 • 70.0 flat steel mill to be located near (Bank) Juiz da Fora in Minas Cerais State. First stage capacity of 1,2 million tons per annum, Total project cost (To be determined) · Up to (R) estimated at-$1.l billion of which . $450 million in foreign.exchange, Integrated Rural Development II - Proj_':!ct preparation u~dl!;rway. _ • 20.0 Development program for the Northeast 1:. ,. (Bank) state of Paraiba. ; (RANCO CENTRAL Up to· Agricultural Export Industries II - Appraisal report being prepared. • DO BRASrL) 85,0 Credit for construction and improve- (Bank) ment of agricultural processing industries in Central and South of Brazil. (To be Up to (R) Minas Gerais Rural Development-agri- Proj,~ct preparation mission in c!etermined} 40.0 cultural development program mainly the field. (Bank) in Zona da Mata region of the State ·of Minas. Gerais, Cia de Eiectricidade de Parana (COPEL) To be determined (Bank) (R) COPEL Foz de Areia/Distribution - 1.1 million kw (2.2 final) hydro- electric station on Iguacu River and Project preparation underway. (Possible financing also by IDB and bilateral agencies). • associated transmission and expan- sion of COPEL's distribution network. To be determined To be determined (Bank} Education III - Primary schools in the North and Northeast States, especially in rural areas, Project preparation underway. • To be To be Fertilizer.I - Construction of new Pro_1 ec t pre para t ton. und_erway, determined determined plant to produce about 1,200 tons (Bank) per day (tpd} of ammonia and ahout 1,500 tpd of urea. (To be determined) Up to 30.0 (Bank) (N} Integrated Rural Development II - Development program for Northeast State of Ceara, Identification mission scheduled for September. • Seep. 1 for footnotes. • • - 59 - • Member Country, and Rorrowcr or Implementing Agency l/ Amount 2/ and Probable Lender Project 1/ Stage .of Processing and Action on Procurement!/ ~RAZIL (Cont'd) OP.pa'rtomcnto Nacional To be (N) Highway VI - Primarily rehabilitation ldent:i.fic.it:l.on mission • dc F.stl"adas de lmbc,r. et Communications (TPTC) HONDURAS 7.0 (R) Integrated Rural Development with Pro_1cct being preparf'd hv _. • (IDA) irrigation component in Comayar,ua Government with FAfJ nsslstance: Valley. Ministerio de Up to (P.) llip,hway- VII - Construction of Talanr,a- Fcar.ib.fl.itv studies for fef'rlf'r Comunicaciones, Obras Publicas y Transporte 30.0 (Bank) Juticalpa road and improvenent of feeder roads and purchase of mainte- nance equipment. roads nnd m:tintenanrr prn1:ram being prepared. • (EMPRESA NACIONAL DE . . Up to Power VII. ~ F.l Ca_1 on hydro power d ev- Feasibi.lity report h,:dnr, upd,1ted . ENERGIA ELECTRICA) 75.0 elopment with related interconnection, (Joint financing from IDB, CARET (Be.nit) transmission and distribution and other lenders likelv.) fac 11 it ies. (EMPRESA NACIONAL PORTUARIA) Up to 10.0 Ports III - Development of a new port at Puerto Cast 11 la to hand 1 e wood and Pro_1cct preparation undcn-my. •• (Bank) agricultural prod.ucts exports: improve- ment of other national port facil fties. Banco Central llp to (R) Livestock III - Continuation of Timing of preparation dependent 9.0 credit prop,ram to finance livestock on pror,ress of Livestock Il. • (IDA) development. Seep. 1 for footnotes. • • - 65 - Member Country, and- Amount 2/ • Borrower or Implementing Agency y and Probable Lender Project'}__/ Stage of Processing and Action on Procurement!!_/ HONDURAS (Cont'd) Up i:o (N) Industry I - Development of pulp Identification mission 30.0 and pnper and other fores try sched11 I f'd for -Septemher. (Rank) industries in the Olancho renion • • JAMAICA {WATER COMMISSION 15.0 (R) Sewerage and Water Supply in Loan signer! on July 23. OF KINGSTON) {Bank) Ki~gston - Wells and water distribution works, -collector sewers, lift stations and force mains, and water studies, Total cost estimated at $30 million • of which $12. 5 million in foreign ~xchange. Bank loan will finance foreign exchange costs includin~ $2.5 million interest during construction. Ministry of To be Education III - Project content not Awaiting Government definition Education determined yet determined. of scope of pr~1ect and progress • Borrower (Bank) To be (R) Sugar Rehabilitation - Factory rehabil- in execution of second erlucatjon project, Appraisal awaitinr, completion of to be de,termined determined itation; irrigation, drainage and field pro.1ect preparation. (Parallel (Bank) equipment for improved cane production, financing with Commonwealth Development Corporation may be arranged.) • (WATER COMMISSION OF KINGSTON) To be determined {Bank) Water Supply II - Kingston. Study, recommending next water supply source for development, will begin later in 1975. Ministry of Health 3.0 (R) Population II and Nutrition - Scope of Appraisal scheduled for end (Bank) project not yet finalized but may October. include rural health facilities, midwife • training school, pa~kaging and· distri- bution of weaning foods information and communication systems, family planning equipment and supplies, and research and evaluation studies. Ministry of 10.0 Rural Development I - Scope of project Pro_1ect befog prepared hy Agriculture (Rank) not yet finalized but may include Government with FAO/InRD • assistance to small farmers through assistance • land settlement and related infra- structure works. {JAMAICA PUBLIC Up to Power II - Transmission and distribu- Pro_iect preparation underway. SERVICE COMPANY) 15.0 tion facilities. {Bank) Jamaica Development Up to Agricultural Credit I I I - Scope of Pro_1Pct preparation mission • Hank (JDB) 7.0 (Bank) project not yet defined but may. include assistance to JnB to finance on-farm improvements for coconut, citrus and livestock, and for agro- scheduled for September. inc,c:rctaria de To be Highways VIII - Construction and im- Project under prepnrntion. Ohr~,; P,_,hlicas determined provement of highway network. (PRODUCTOS FORESTALES 0~'. MEXICO (PROFORMEX)) (!lank) _To be determined Forest Industries in State of Durango · - Establishment of sa~nnil.ls; plywood Revised feasihi 1 i.tv ·studv hr,lng prepared hy Government·:.' • (Bank) factories, 'iiner hoard plant and infra- structure such as forestry roads, water supply. Fer rocar 1· iles Nae.ton.ales de MexJ.co 100.0 (Bank) Railways in - Rehabilitation and modernization. Total project cost estimated at $593 million of wh:l.ch about $270 mil.lion in foreign exchange. Apprais.-11 report heinr. prepared. • ' (llAicl de ·Proyec tos y (IDA) Government's prc-lnvcntment program for Aur.11st. Danco Central for 197 5-79. Total pro_\ect cost estimated at $5. 7 mili:i.on of whlch $4 Ministerio de Obr_as Publicas 7.0 (Bank) (R) million in foreign exchange. Domestic Airports - Improvement of small r. including provisions of credit and Minist·erio de Obras Publicas To be determined infrastructure in exisring colonies. Highway !-!ai11tenance II. . Project preparation 11nderwny •. • (Bank) PERU (EMPRESAS Power dist~ib~tion for the Lima metro- Appiaisal r~pott helnr, prcpnrrcl. • 35.0 (R) ELECTRICAS (Bank) politan area, iricludinr, transmission, ASOCIADAS) su6ttansmis•ton, distribution, auxil- Procurement: ··Re_troactive ff-· iary services and support facilities, ·n:rncing for an amount yr,t to be technicai assistance and training for determined may be recommenclecl. power sector. Total project cost estimated at Si~5 million of which $36 million in foreir,n exchange. (CORPORACION FINANCIERA DE DESARROLLO - (COFIDE)) _Up to 30.0 (Bank) Development Finance Company. Appraisal report·being prepared. • (CENTROMIN-PERlJ) To be Expan,:;ion p_roi•,ram for min l.ni'. and Apprnfsal report h~lnr. prepared. determined refintnr. of non-ferrous metals and (llank) water treatment plant. Total project cost esti~ated at about $120 miilion of which about $SR million in foreir,n exchanr,e. • Seep. 1 for footnotes. • • - 69 - • ' Member Country, and- Amount Jj Borrower or and Probable· Star.e of Processinr. :mcl Implementing Agency· y Le~-- Pro1ect 1/ Action on Procurement_ !:_/ PERU (Cont'd) ~iin 1.stcrio de 20.0 (R) Irrigation Rehahilitation-Desaliniza- F-/\0/lr.~r:, Cooper at iv<' l'rof',r.1c,, Agricul turn (l:,1nk) tion ,ind