Procurement 1. Procurement for the project will be carried out in accordance with the World Bank’s “Guidelines: Procurement of Goods, Works, and Non-Consulting Services under IBRD Loans and IDA Credits & Grants” dated January 2011 (revised July 2014); and “Guidelines: Selection and Employment of Consultants under IBRD Loans and IDA Credits & Grants by World Bank Borrowers” dated January 2011 (revised 2014); and the provisions stipulated in the Loan Agreement and the POM and GOM. The World Bank Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by IBRD Loans and IDA Credit and Grants dated October 15, 2006 and revised on January 2011, would also apply. Procurement arrangements and capacity assessment 2. Considering the complexity of the project and the weak procurement and management capacity at the MoESTD, the risk rating is assessed as “high.” The procurement method and prior review thresholds applicable to the project will be based on the ECA Regional Maximum Procurement Thresholds, effective January 2, 2014 (revised February 10, 2015). Table 1. Procurement Thresholds PROCUREMENT METHOD THRESHOLDS PRIOR REVIEW THRESHOLDS ICB: =/>EUR 900,000 (Goods); =/>EUR All 4.5M (Works) NCB: EUR 265,000 =/> EUR 450,000 CQS: EUR 2,000 accordance with paras. 3.8-3.11 of the Consultant Guidelines Direct Contracting – none, in accordance =/>EUR45,000 with paras. 3.7 & 3.8 of the Procurement Guidelines 3. All TORs are subject to prior review irrespective of prior/post review status. 4. A detailed Project Operational Manual (POM) and Grants Operational Manual (GOM) is being prepared. The manuals will include procurement and selection methods to be used in the project along with their step–by-step explanation as well as the standard and sample documents to be used for each method, and service standards, responsibilities and accountability of PMU and CFU staff and management for carrying out the activities. 5. Risk Mitigation: The following measures were agreed to mitigate the risks and maintain the implementing team’s capacity. Table 2. Procurement Mitigation Actions Risk Mitigation Delay in project implementation due to • Retroacting financing of key challenges in setting up the CFU and consultant positions in the CFU and PMU and in selecting qualified PMU so that selection can be consultants. launched before or immediately after negotiations. These key consultants will complete/revise the procurement plan and prepare the draft bidding documents and TORs for the initial packages. Limited procurement capacity of the CFU • All TORs for consulting services are and lack of knowledge of Bank’s subject to the Bank’s prior review. procurement and consultant guidelines • The selection process for the 3 CFU may delay selection/bidding process and positions are subject to the Bank’s contract management prior review. • Training will be provided to the procurement specialist especially in regard to the use of System Tracking of Exchanges in Procurement (STEP). • Additional procurement and FM training will be provided to the staff. • Post review of contracts. • CFU staff, especially the procurement expert, will attend procurement training organized by the Bank. • CFU will be provided with full set of the relevant, most recent Bank procurement documents, including but not limited to standard and sample bidding documents, proposal formats, evaluation report documents, etc. Risk Mitigation Unsatisfactory quality of technical • All TORs are subject to the Bank’s designs/ToRs may lead to delays in prior review. contract implementation and to contract • Bank team will provide MoESTD amendments with sample TORs as needed. • Preparation of draft technical specifications/terms of reference before project effectiveness, at least for the contracts for which the selection process is to take place in the first 12 months of the project implementation; • Technical assistance of Bank technical experts in the review of the TOR/TS and designs. The public officials/technical staff who • POM and GOM will detail service will be involved in project procurement standards, responsibilities and through tender committees may not be accountability of CFU staff, PMU familiar with the applicable procurement staff, and technical staff procedures, slowing down the management for carrying out the procurement process activities. • The order for appointment of evaluation committees will specify the timeframe by which the evaluation committee should complete evaluation and recommendation of award. Insufficient technical capacity within • A coordinator for each component MoESTD to coordinate and supervise will be financed under the project. activities may cause contract • Adequate consulting services and supervision delays related to technical assistance, training, implementation and poor quality of knowledge exchange will be goods, works and services. financed by the project to supplement the existing capacity. • Bank staff will provide intensive and close supervision. Procurement Plan 6. The Borrower, at appraisal, prepared a draft procurement plan for the first 18 months of project implementation (see Table 4), which provides the relevant activities to be procured and forms the basis for procurement methods. It does not yet include the Bank’s review requirements and thresholds as these will be determined based on the costs. The procurement plan will be further reviewed and agreed between the Borrower and the Bank during negotiations. The Procurement Plan will then be updated on a regular basis as needed, in agreement with the Bank, to reflect the actual project implementation needs. Table 4. Procurement Plan Reference Description of Activity No. Com ponent 1 - Ex panding the s uply of pres chool s ervices(approx im ately $34M) 1a Renovation, Repurposing and Expansion of Buildings for Preschools 1b Technical docum entation for m odel kindergardens in formfactors 4 to 10 groups 1c Construction or renovation of Innovative ECEC Centers 1d Design Services and Author Supervision 1e Construction Supervision Services 1f Furniture and Equipm ent for Preschools (including toys and playgrounds) 1g Training for local architects and engineers Com ponent 2 - Ens uring the quality of pres chool S ervices(approx imately $5M) Sub-com bonent 2.1: Supporting the im plem entation of the preschool curriculum 2.1a TA to Evaluate & reform/harmonize the systemand curriculumframework for initial educaion of ECEC teachers 2.1b Teacher training Sub-com bonent 2.2: Im proving pre- and in-service teacher training 2.2.a TA to im prove the content & form s of teacher professional developm ent 2.2.b Harm onization of current legislation on preschool education Sub-com bonent 2.3: Im proving the m onitoring and evaluation of preschools to im prove decision-m aking 2.3.a EMIS +Module for MoLEVSA MIS for Subsidies TA Developm ent of in-service training programfor im plem entation of the new curriculumand the developm ent 2.3.b of teaching-learning m aterials (e.g. guidelines, m anuals, etc.) based on the new curriculum 2.3.c TA assessm ent of the existing quality evaluation instrum ents and m ethodology and their im provem ent 2.3.d TA to develop strategies to expand and regulate the provision of ECEC Com ponent 3 - S upporting young children and fam ilies(approxim ately $9M) Sub-com bonent 3.1: Com m unication cam paign 3.1a Preparation of com mucation strategy 3.1b TV Broadcast over licensed TV stations 3.1c Radio Broadcast over licensed radio stations Sub-com ponent 3.2: Outreach to vulnerable fam ilies 3.2a Grants to at least 30 m unicipalities Sub-com ponent 3.3: Subsidies to ensure free preschool participation am ong the m ost vulnerable children 3.3a Annual reim bursem ent of up to $1M Com ponent 4: Project m anag em ent, technical as sistance, and m onitoring and evaluation (approx im ately $2M) Sub-com ponent 4.1: Project m anagem ent and technical assistance 4.1a Project Director 4.1b Coordinator of Com ponent 1 4.1c Coordinator of Com ponent 2 4.1d Coordinator of Com ponent 3 4.1e Grant Coordinator 4.1f Safeguard Specialist 4.1g CFU Director 4.1h CFU Procurem ent Specialist 4.1i CFU Financial Managem ent Specialist 4.1j Audit Services 4.1k PMU Office Equipm ent and Furniture 4.1l Operating Expenses Sub-com ponent 4.2: Monitoring and evaluation 4.2a Monitoring & Evaluation Specialist 4.2b Baseline Survey 4.2.c Technical audit of various activities under the project 4.2d Technical evaluation of the first phase of the grant program 4.2e Staff Training Procurement of Goods, Works and Non-Consulting Services 7. The following methods may be used for procurement of goods, works and non-consulting services as agreed in the procurement plan: International Competitive Bidding (ICB), National Competitive Bidding (NCB), Shopping (S), and Direct Contracting (DC). 8. Procurement of Works. Civil works include new construction and rehabilitation of pre-schools. Procurement will be conducted for the most part at the municipal level using NCB as defined in the applicable Guidelines. There is no prequalification anticipated under the project. Works may be packaged into lots depending on the availability of designs, location of schools, and procurement capacity of municipalities involved. In such a case, procurement will be conducted by the CFU. At a minimum, the CFU procurement specialist will be a member of the Evaluation Committee (EC) who will ensure that bid evaluation procedures are observed and bid evaluation report prepared and signed by the EC members. 9. Procurement of Goods. Goods to be procured include furniture, equipment and toys for the schools, among others. Selection of Consultants 10. The following methods may be used for the selection of consultants: Quality and Cost-Based Selection (QCBS), Quality-Based Selection (QBS), Least-Cost Selection (LCS), Fixed Budget Selection (FBS), Selection based on Consultants Qualifications (CQS), Individual Consultant Selection (IC), and Single Source Selection (SSS). The World Bank's Standard Request for Proposals will be used. All Terms of Reference, irrespective of prior/post review status, are subject to Bank’s review and no objection. 11. A variety of consulting services are required (e.g. communication campaign, which is anticipated to be launched under QCBS). Other technical assistance activities required are: analysis of and regulatory changes to encourage expansion of preschool services including reforms, analysis and adjustment of Serbia’s ECEC system to improve its economic and organizational efficiency, improve the content and forms of teacher professional development, and harmonization of the current legislation that regulates preschool education Post-review Percentages and Frequency 12. Contracts not subject to Bank’s prior review would be subject to post review by the Bank’s procurement specialist. Post review of contracts will be carried out once per year. At a minimum, one out of five contracts will be randomly selected for post review. General Procurement Notice 13. The General Procurement Notice (GPN) for the Project will be published in the UN Development Business after loan negotiations. PROCUREMENT Serbia : Inclusive Early Childhood Education and Care PLAN General Information Country: Serbia Bank’s Approval Date of the Original Procurement Plan: 2018-09-27 2021-10-21 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P157117 GPN Date: Project Name: Inclusive Early Childhood Education and Care Loan / Credit No: IBRD / 86930 Central Fiduciary Unit Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SER-ECEC-8693YF-NCB-W- 19-40 / Reconstruction, Extension Works and Expanding the supply of Single Stage - One 1,749,819.5 2020-08- Construction Works for IBRD / 86930 Post Request for Bids Open - National Signed 2019-04-12 2019-05-24 2019-04-17 2019-05-28 2019-05-27 2019-06-26 2019-06-19 2019-10-04 2019-07-24 2019-10-23 preschool spaces Envelope 5 17 Preschool Facilities in Doljevac, Žitorađa and Sremska Mitrovica SER-ECEC-8693YF-NCB-W- 20-58 / Reconstruction and extension of the existing facilities Golub Mira and Labud, Krusevac (lot1); Expanding the supply of Single Stage - One 2,720,210.6 2022-03- Construction of the preschool IBRD / 86930 Post Request for Bids Open - National Signed 2020-11-30 2021-01-12 2020-12-07 2021-01-18 2021-02-10 2021-02-19 2021-06-17 2021-03-19 2021-07-01 preschool spaces Envelope 2 21 facility kindergarten in Loznicko Polje, Loznica (lot2); Construction of the new facility as part of Poletarac, Merosina (lot3) SER-ECEC-8693YF-NCB-W- Request for 21-63 / Construction works Bids - Small Under of Preschool Facility in Expanding the supply of Single Stage - One 2022-11- IBRD / 86930 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-07-12 2021-07-27 2021-07-17 2021-08-28 2021-08-26 2021-09-27 2021-11-01 Prokuplje -Lot 1 and preschool spaces Envelope 01 envelope ion Extension works of Preschool process) Facility in Vladičin Han- Lot 2 SER-ECEC-8693YF-NCB-W- Request for 21-65 / Construction of Bids - Small Pending Expanding the supply of Single Stage - One 2022-12- Preschool Facilities in IBRD / 86930 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-08-27 2021-09-03 2021-10-15 2021-11-14 2021-12-12 preschool spaces Envelope 12 Smederevo and Sid (Lot 1 and envelope ion Lot 2) process) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SER-ECEC-8693YF-RFQ-G- 21-71 / Procurement of wooden furniture and other equipment for furnishing Under Expanding the supply of Request for Single Stage - One children's rooms and other IBRD / 86930 Post Limited 0.00 Implementati 2021-09-03 2021-09-10 2021-10-29 2022-01-27 preschool spaces Quotations Envelope spaces in newly built facilities on of preschool institutions in Doljevac (Pukovac) and Žitorađa SER-ECEC-8693YF-RFQ-G- 21-70 / Supply and delivery of toys, didactic material, sports equipment and props Expanding the supply of Request for Single Stage - One IBRD / 86930 Post Limited 0.00 Canceled 2021-09-03 2021-09-08 2021-10-15 2021-11-09 for equipping children's preschool spaces Quotations Envelope rooms in newly built preschool facilities in Doljevac (Pukovac) and Žitorađa SER-ECEC-8693YF-DC-G-21- 70-2 / Supply and delivery of toys, didactic material, sports Pending equipment and props for Expanding the supply of IBRD / 86930 Post Direct Selection Direct 0.00 Implementati 2021-10-07 2021-10-08 2021-10-27 2021-11-21 equipping children's rooms in preschool spaces on newly built preschool facilities in Doljevac (Pukovac) and Žitorađa SER-ECEC-8693YF-SH-G-21- 73 / Shopping of Furniture for Children's Rooms in Preschool Pending Expanding the supply of Request for Single Stage - One Institutions Novi Sad IBRD / 86930 Post Limited 0.00 Implementati 2021-11-05 2021-12-24 2022-05-31 preschool spaces Quotations Envelope (Kalimero), Loznica (Bambi), on Zemun (Zemunski Biser), Cacak (Lane), and Pirot (Lane) SER-ECEC-8693YF-SH-G-21- 74 / Shopping of IT equipment for children's Pending rooms in pre-school Expanding the supply of Request for Single Stage - One IBRD / 86930 Post Limited 0.00 Implementati 2021-11-05 2021-12-24 2022-05-31 institutions Novi Sad preschool spaces Quotations Envelope on (Kalimero), Loznica (Bambi), Zemun (Zemunski biser), Cacak (Lane), and Pirot (Lane) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Page 1 Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SER-ECEC-8693-YF-SSS-CS- 18-28 / DEVELOPMENT AND IMPLEMENTATION OF THE CAPACITY BUILDING Strengthening the quality of UN Agencies IBRD / 86930 Prior Direct 3,865,726.44 Signed 2019-02-06 2019-06-03 2022-12-30 PROGRAMME FOR PRE- preschool services (Direct) SCHOOL EDUCATION CURRICULUM IMPLEMENTATION IN SERBIA SER-ECEC-8693YF-QCBS-CS- Supporting young children Quality And Cost- 19-36 / Public Awareness IBRD / 86930 Prior Open - International 2,659,440.82 Signed 2019-02-01 2019-02-07 2019-03-01 2019-04-01 2019-04-26 2019-04-22 2019-05-31 2019-05-24 2019-07-12 2019-06-06 2019-08-30 2019-07-09 2019-10-18 2019-07-12 2022-09-02 and families Based Selection Campaign SER-ECEC-8693YF-LCS-CS- 19-38 / AUDIT OF THE ECEC PROJECT FOR THE YEARS 2018 - FIRST PERIOD, 2019- Project management, SECOND PERIOD, 2020-THIRD Least Cost IBRD / 86930 technical assistance, and Post Open - National 65,247.07 Signed 2019-02-19 2019-02-13 2019-02-26 2019-04-11 2019-02-19 2019-05-09 2019-03-19 2019-06-08 2019-03-28 2019-07-13 2019-04-16 2019-08-17 2019-04-22 2022-12-16 PERIOD, 2021-FORTH PERIOD Selection monitoring and evaluation AND 2022-FIFTH PERIOD ENDED ON THE LAST DAY OF THE YEAR FOR THE SAID PERIOD SER-ECEC-8693YF-CQ-CS- 19-39 / IMPROVING THE EVALUATION SYSTEM OF PRESCHOOL EDUCATION IN Consultant Strengthening the quality of SERBIA AND MONITORING THE IBRD / 86930 Post Qualification Open - National 101,919.79 Signed 2019-03-13 2019-03-18 2019-04-03 2019-05-17 2019-04-22 2019-06-16 2019-05-28 2019-07-21 2019-05-28 2020-01-17 preschool services PROJECT DEVELOPMENT Selection OBJECTIVE IN THE AREA OF PRESCHOOL EDUCATION QUALITY SER-ECEC-8693YF-CQ-CS- Project management, Consultant 19-46 / ENVIRONMENTAL IBRD / 86930 technical assistance, and Post Qualification Open - National 203,930.14 Signed 2019-11-08 2019-11-04 2019-11-22 2019-12-06 2019-12-05 2019-12-13 2020-02-27 2019-12-19 2020-02-28 2022-12-30 CONSULTING FIRM monitoring and evaluation Selection SER-ECEC-8693YF-CQ-CS- 19-52 / PERFORMANCE AND OPERATIONAL AUDIT FOR THE Project management, Consultant GRANT PROGRAM IBRD / 86930 technical assistance, and Post Qualification Open - National 59,040.00 Signed 2019-12-27 2020-01-23 2020-01-24 2020-02-23 2020-06-01 2020-03-24 2020-10-07 2020-04-28 2020-10-07 2022-10-31 FOR IMPROVING THE monitoring and evaluation Selection PROVISION OF QUALITY ECEC SERVICES SER-ECEC-8693YF-CQ-CS- 20-54 / IMPROVING Consultant Strengthening the quality of PROFESSIONAL DEVELOPMENT IBRD / 86930 Post Qualification Open - National 42,349.48 Signed 2020-08-07 2020-07-28 2020-09-04 2020-10-16 2020-09-18 2020-10-23 2021-02-18 2020-11-13 2021-02-19 2021-06-30 preschool services OF PRESCHOOL EDUCATION Selection SYSTEM PRACTITIONERS SER-ECEC-8693YF-CQ-CS- 20-57 / Supporting the Consultant Development of Digital Strengthening the quality of IBRD / 86930 Post Qualification Open - National 73,769.97 Signed 2020-09-30 2020-09-21 2020-10-28 2020-12-09 2021-03-23 2020-12-16 2021-06-10 2020-12-28 2021-06-10 2022-06-30 Competencies of Preschool preschool services Selection Education System Practitioners SER-ECEC-8693YF-CQ-CS- Consultant 21-60 / Improving Preschool Strengthening the quality of IBRD / 86930 Post Qualification Open - National 151,518.41 Signed 2021-01-25 2021-01-13 2021-02-22 2021-04-16 2021-04-05 2021-04-23 2021-05-20 2021-05-05 2021-05-20 2022-12-30 Institutions Self-Evaluation preschool services Selection Process INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SER-ECEC-8693YF-IC-CS-17- Individual Expanding the supply of 03 / Central Fiduciary Unit IBRD / 86930 Prior Consultant Open 182,834.47 Signed 2017-10-06 2017-10-24 preschool spaces (CFU) Procurement Specialist Selection SER-ECEC-8693YF-IC-CS-17- Individual 02 / Central Fiduciary Unit Expanding the supply of IBRD / 86930 Prior Consultant Open 182,834.47 Signed 2017-10-06 2017-10-24 (CFU) Financial Management preschool spaces Selection Specialist Individual SER-ECEC-8693YF-IC-CS-17- Expanding the supply of IBRD / 86930 Prior Consultant Open 241,178.95 Signed 2017-10-06 2017-10-24 01 / CFU Director preschool spaces Selection Individual SER-ECEC-8693YF-IC-CS-17- Expanding the supply of IBRD / 86930 Prior Consultant Open 218,759.65 Signed 2017-10-17 2017-11-01 04 / PMU Director preschool spaces Selection SER-ECEC-8693YF-IC-CS-18- Project management, Individual 14 / CENTRAL FIDUCIARY IBRD / 86930 technical assistance, and Prior Consultant Open 239,330.32 Signed 2018-10-03 2018-10-04 2018-11-21 2018-10-08 2018-12-12 2018-10-08 2019-01-16 2018-10-09 2019-07-15 UNIT (CFU) DIRECTOR monitoring and evaluation Selection SER-ECEC-8693YF-IC-CS-18- Project management, Individual 16 / Project Coordinator for IBRD / 86930 technical assistance, and Post Consultant Open 145,586.73 Signed 2018-11-30 2019-01-18 2018-09-27 2019-02-08 2018-11-05 2019-03-15 2018-11-05 2019-09-11 Component 1 monitoring and evaluation Selection SER-ECEC-8693-YF-SSS-CS- Project management, Individual 18-17 / Junior Engineer for IBRD / 86930 technical assistance, and Post Consultant Direct 78,678.00 Terminated 2018-11-30 2018-11-05 2018-12-10 2018-12-31 2018-11-05 2019-02-04 2018-11-05 2019-08-03 Component 1 monitoring and evaluation Selection Project management, Individual SER-ECEC-8693-YF-IC-CS- IBRD / 86930 technical assistance, and Post Consultant Open 94,559.87 Signed 2018-11-30 2019-01-18 2018-09-27 2019-02-08 2018-11-05 2019-03-15 2018-11-05 2019-09-11 18-18 / Project Architect monitoring and evaluation Selection Page 2 SER-ECEC-8693-YF-IC-CS- 18-19 / Engineer responsible Project management, Individual for Bidding Procedures, IBRD / 86930 technical assistance, and Post Consultant Open 68,697.19 Signed 2018-11-30 2019-01-18 2019-02-08 2018-11-02 2019-03-15 2018-11-02 2019-09-11 Monitoring Contracts and monitoring and evaluation Selection Construction Works SER-ECEC-8693-YF-IC-CS- Project management, Individual 18-20 / Structural Engineer IBRD / 86930 technical assistance, and Post Consultant Open 27,297.60 Completed 2018-11-30 2019-01-18 2019-02-08 2018-11-02 2019-03-15 2018-11-02 2019-09-11 2019-10-31 part time monitoring and evaluation Selection SER-ECEC-8693-YF-IC-CS- Project management, Individual 18-21 / Mechanical Engineer IBRD / 86930 technical assistance, and Post Consultant Open 27,297.60 Signed 2018-11-30 2019-01-18 2018-11-02 2019-02-08 2018-11-02 2019-03-15 2018-11-02 2019-09-11 part time monitoring and evaluation Selection SER-ECEC-8693-YF-IC-CS- Project management, Individual 18-23 / Urban Planning IBRD / 86930 technical assistance, and Post Consultant Open 27,280.00 Completed 2018-11-30 2019-01-18 2019-02-08 2018-11-02 2019-03-15 2018-11-02 2019-09-11 2019-10-31 Engineer part time monitoring and evaluation Selection SER-ECEC-8693-YF-IC-CS- Project management, Individual 18-24 / Legal Expert for IBRD / 86930 technical assistance, and Post Consultant Open 55,347.42 Signed 2018-11-30 2019-01-18 2019-02-08 2018-11-02 2019-03-15 2018-11-02 2019-09-11 Component 1 part time monitoring and evaluation Selection SER-ECEC-8693-YF-IC-CS- Project management, Individual 18-25 / Component 1 IBRD / 86930 technical assistance, and Post Consultant Open 52,872.30 Signed 2018-11-30 2019-01-18 2019-02-08 2018-11-23 2019-03-15 2018-11-23 2019-09-11 Economist part-time monitoring and evaluation Selection SER-ECEC-8693-YF-IC-CS- Project management, Individual 18-27 / Project Coordinator IBRD / 86930 technical assistance, and Post Consultant Open 108,463.12 Signed 2018-12-10 2018-12-07 2019-02-13 2019-01-18 2019-03-08 2019-01-18 2019-04-16 2019-01-18 2022-12-30 for Component Three monitoring and evaluation Selection Project management, Individual SER-ECEC-8693-YF-IC-CS- IBRD / 86930 technical assistance, and Post Consultant Open 95,567.42 Signed 2018-12-07 2017-12-08 2019-02-10 2018-02-28 2019-03-05 2018-02-28 2019-04-13 2018-02-28 2022-12-27 17-07 / Project Assistant monitoring and evaluation Selection Project management, Individual SER-ECEC-8693-YF-IC-CS- IBRD / 86930 technical assistance, and Post Consultant Open 264,669.99 Signed 2018-12-07 2019-02-10 2018-07-09 2019-03-05 2018-07-09 2019-04-13 2018-07-09 2022-12-27 18-10 / Grant Coordinator monitoring and evaluation Selection SER-ECEC-8693-YF-IC-CS- Project management, Individual 18-12 / Project Coordinator IBRD / 86930 technical assistance, and Post Consultant Open 121,757.15 Signed 2018-12-07 2019-02-10 2018-07-09 2019-03-05 2018-07-09 2019-04-13 2018-07-09 2022-12-27 for Component Two monitoring and evaluation Selection Project management, Individual SER-ECEC-8693-YF-IC-CS- IBRD / 86930 technical assistance, and Post Consultant Open 79,545.15 Signed 2018-12-11 2018-12-13 2019-02-22 2019-01-22 2019-03-22 2019-02-08 2019-05-10 2019-02-08 2019-11-06 18-29 / LEGAL SPECIALIST monitoring and evaluation Selection SER-ECECI-8693YF-IC-CS-19- 30 / Development and Individual Maintenance of the Preschool Strengthening the quality of IBRD / 86930 Post Consultant Open 59,927.55 Signed 2019-01-28 2019-01-22 2019-04-08 2019-04-05 2019-05-06 2019-04-16 2019-06-17 2019-04-16 2022-12-30 Education and Monitoring preschool services Selection Information System Consultant SER-ECEC-8693YF-IC-CS-19- 32 / Component Two Individual Consultant for Devising Strengthening the quality of IBRD / 86930 Post Consultant Open 2,126.50 Signed 2019-01-28 2019-01-22 2019-04-29 2019-04-19 2019-06-03 2019-05-07 2019-07-22 2019-05-07 2019-12-23 Research Methodology of preschool services Selection Preschool Institutions Self- Evaluation Practices SER-ECEC-8693YF-IC-CS-19- 33 / Component Two Individual Consultant for Conducting Strengthening the quality of IBRD / 86930 Post Consultant Open 1,603.48 Signed 2019-01-28 2019-01-22 2019-04-10 2019-04-05 2019-05-08 2019-04-16 2019-06-12 2019-04-16 2019-11-12 Research of Preschool preschool services Selection Institutions Self-Evaluation Practices SER-ECEC-8693YF-IC-CS-19- Individual Strengthening the quality of 35 / Preschool Education IBRD / 86930 Post Consultant Open 66,516.12 Signed 2019-01-28 2019-01-22 2019-05-01 2019-04-05 2019-05-29 2019-04-25 2019-07-12 2019-04-25 2022-12-30 preschool services Associate for Component Two Selection SER-ECEC-8693YF-SSS-CS- 19-31 / Education Specialist for Designing and Strengthening the quality of IBRD / 86930 Post Direct Selection Direct 4,517.68 Signed 2019-01-28 2019-01-23 2019-02-13 2019-01-30 2019-05-10 2019-02-13 2020-05-10 Implementing Specific preschool services Training Program for External Evaluators SER-ECEC-8693YF-SSS-CS- 19-34 / Component Two Education Specialist for Strengthening the quality of IBRD / 86930 Post Direct Selection Direct 6,023.57 Signed 2019-01-28 2019-01-23 2019-02-27 2019-01-31 2019-06-07 2019-02-13 2019-11-01 Preparing a Draft Rule Book preschool services on Keeping Records of Educational Activities Project management, Individual SER-ECEC-8693-YF-IC-CS- IBRD / 86930 technical assistance, and Post Consultant Open 0.00 Canceled 2019-02-01 2019-06-17 2019-04-12 2019-05-10 2019-06-28 2022-12-30 19-37 / Electrical Engineer monitoring and evaluation Selection SER-ECEC-8693YF-IC-CS-19- Project management, Individual 41 / Environmental Specialist IBRD / 86930 technical assistance, and Post Consultant Open 0.00 Canceled 2019-04-18 2019-04-15 2019-05-28 2019-06-03 2019-06-09 2022-12-25 (part -time) monitoring and evaluation Selection Project management, Individual SER-ECEC-8693YF-IC-CS-19- IBRD / 86930 technical assistance, and Post Consultant Open 52,519.46 Terminated 2019-05-17 2019-05-17 2019-07-15 2019-07-29 2019-08-01 2019-08-01 2019-08-21 2019-08-01 2022-12-30 43 / Grant Assistant monitoring and evaluation Selection SER-ECEC-8693YF-SSS-CS- Project management, Individual 19-42 / Consultant for the IBRD / 86930 technical assistance, and Post Consultant Direct 3,417.45 Signed 2019-05-15 2019-05-20 2019-05-20 2019-05-20 2019-05-23 2019-05-21 2019-06-07 2019-05-21 2019-09-05 preparation of the furniture monitoring and evaluation Selection procurement specification SER-ECEC-8693YF-IC-CS-19- Project management, Individual 44 / Environmental Specialist IBRD / 86930 technical assistance, and Post Consultant Open 0.00 Canceled 2019-09-12 2019-09-12 2019-10-13 2019-10-15 2019-10-20 2022-12-30 (part-time) monitoring and evaluation Selection Project management, Individual SER-ECEC-8693YF-IC-CS-19- IBRD / 86930 technical assistance, and Post Consultant Open 56,012.08 Signed 2019-09-23 2019-09-16 2019-10-18 2019-09-27 2019-10-25 2019-10-11 2019-11-04 2019-10-10 2022-12-30 45 / Grant Assistent monitoring and evaluation Selection Page 3 Project management, Individual SER-ECEC-8693YF-IC-CS-19- IBRD / 86930 technical assistance, and Post Consultant Open 54,208.70 Signed 2019-11-15 2019-11-27 2019-12-27 2020-01-29 2020-01-03 2020-01-31 2020-01-13 2020-01-31 2022-12-30 47 / Financial Associate monitoring and evaluation Selection SER-ECEC-8693-YF-IC-CS- Project management, Individual 19-48 / Structural Engineer IBRD / 86930 technical assistance, and Post Consultant Open 27,439.84 Signed 2019-12-02 2019-12-04 2020-01-20 2021-08-10 2020-02-10 2021-08-20 2020-03-16 2021-08-20 2020-09-12 part time monitoring and evaluation Selection SER-ECEC-8693-YF-IC-CS- Project management, Individual Under 19-49 / Urban Planning IBRD / 86930 technical assistance, and Post Consultant Open 0.00 2019-12-02 2021-08-08 2020-01-20 2020-02-10 2020-03-16 2020-09-12 Implementation Engineer part time monitoring and evaluation Selection Project management, Individual SER-ECEC-8693-YF-IC-CS- Under IBRD / 86930 technical assistance, and Post Consultant Open 0.00 2019-12-02 2019-12-04 2020-02-10 2020-03-09 2020-04-27 2023-10-30 19-50 / Electrical Engineer Implementation monitoring and evaluation Selection SER-ECEC-8693YF-IC-CS-19- Individual Strengthening the quality of 51 / Associate for Inclusive IBRD / 86930 Post Consultant Open 49,549.50 Signed 2019-12-08 2019-12-13 2020-03-10 2020-01-27 2020-04-07 2020-01-28 2020-05-21 2020-01-31 2023-11-09 preschool services Preschool Education- full time Selection Individual SER-ECEC-8693YF-IC-CS-20- Expanding the supply of IBRD / 86930 Post Consultant Open 34,744.53 Signed 2020-06-19 2020-06-12 2020-07-24 2020-12-11 2020-07-31 2020-12-21 2020-08-14 2020-12-21 2022-10-31 53 / Junior Architect preschool spaces Selection SER-ECEC-8693YF-SSS-CS- 20-56 / Converting the Preschool Institutions Strengthening the quality of IBRD / 86930 Post Direct Selection Direct 3,607.89 Signed 2020-09-18 2020-09-17 2020-09-28 2020-09-21 2020-10-27 2020-10-08 2020-12-31 principles training from in preschool services vivo into distance-learning format SER-ECEC-8693YF-SSS-CS- 20-59 / Coordination of Activities on Expanding the supply of IBRD / 86930 Prior Direct Selection Direct 2,470,118.62 Signed 2021-01-08 2021-01-13 2021-01-18 2021-01-20 2021-03-01 2021-05-11 2022-12-30 Renovating/Repurposing and preschool spaces Equipping New Preschool Classrooms SER-ECEC-8693YF-SSS-CS- 21-61 / CONSULTANT FOR PREPARING SPECIFICATION Project management, Individual FOR PROCURING FURNITURE IBRD / 86930 technical assistance, and Post Consultant Direct 21,620.70 Signed 2021-04-12 2021-04-07 2021-04-22 2021-04-15 2021-04-26 2021-04-23 2021-05-04 2021-04-23 2021-10-31 AND DIDACTIC EQUIPMENT monitoring and evaluation Selection FOR NEWLY BUILT PRESCHOOL FACILITIES (PART-TIME CONSULTANT) SER-ECEC-8693YF-SSS-CS- Project management, Individual 21-64 / Advisor on Parenting IBRD / 86930 technical assistance, and Post Consultant Direct 34,886.19 Signed 2021-08-12 2021-08-09 2021-08-22 2021-08-10 2021-08-27 2021-08-16 2021-08-31 2021-08-16 2022-12-30 and Inclusion monitoring and evaluation Selection SERC-ECEC-8693-YF-IC-CS- 21-66 / ASSOCIATE FOR SUPPORTING REFLECTIVE PRACTICE DEVELOPMENT IN KINDERGARTENS AS PART OF Individual Strengthening the quality of Under THE PROFESSIONAL LEARNING IBRD / 86930 Post Consultant Open 0.00 2021-08-25 2021-08-25 2021-10-13 2021-11-03 2021-12-08 2022-12-30 preschool services Implementation COMMUNITY MODEL – Selection CONSULTANT FOR KINDERGARTENS IN GROUP ONE (IC) (PART-TIME CONSULTANT) SER-ECEC-8693-YF-IC-CS- 21-67 / ASSOCIATE FOR SUPPORTING REFLECTIVE PRACTICE DEVELOPMENT IN KINDERGARTENS AS PART OF Individual Strengthening the quality of Under THE PROFESSIONAL LEARNING IBRD / 86930 Post Consultant Open 0.00 2021-08-25 2021-08-25 2021-10-13 2021-11-03 2021-12-08 2022-12-30 preschool services Implementation COMMUNITY MODEL – Selection CONSULTANT FOR KINDERGARTENS IN GROUP TWO (IC) (PART-TIME CONSULTANT) SER-ECEC-8693-YF-IC-CS- 21-68 / ASSOCIATE FOR SUPPORTING REFLECTIVE PRACTICE DEVELOPMENT IN KINDERGARTENS AS PART OF Individual Strengthening the quality of Under THE PROFESSIONAL LEARNING IBRD / 86930 Post Consultant Open 0.00 2021-08-25 2021-08-25 2021-10-13 2021-11-03 2021-12-08 2022-12-30 preschool services Implementation COMMUNITY MODEL – Selection CONSULTANT FOR KINDERGARTENS IN GROUP THREE (IC) (PART-TIME CONSULTANT) SER-ECEC-8693-YF-IC-CS- 21-69 / ASSOCIATE FOR Individual HORIZONTAL EXCHANGE Strengthening the quality of IBRD / 86930 Post Consultant Open 5,830.00 Signed 2021-08-25 2021-08-25 2021-10-13 2021-10-13 2021-11-03 2021-10-18 2021-12-08 2021-10-18 2022-12-30 BETWEEN PRESCHOOL preschool services Selection PRACTITIONERS (PART-TIME POSITION) (IC) Page 4