The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) MIDDLE EAST AND NORTH AFRICA | Jordan | Finance, Competitiveness and Innovation Global Practice | Requesting Unit: MNC02 | Responsible Unit: EMNF2 IBRD/IDA | Program-for-Results Financing | FY 2017 | Team Leader(s): Meriem Ait Ali Slimane Seq No: 8 | ARCHIVED on 28-Jun-2020 | ISR42153 | Created by: Fahma B. Nur on 03-Jun-2020 | Modified by: Meriem Ait Ali Slimane on 18-Jun- 2020 Program Development Objectives Program Development Objective (from Program Appraisal Document) PDO: " Improve Economic Opportunities for Jordanians and Syrian refugees in Jordan" Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Satisfactory Implementation Status and Key Decisions The project has been restructured and benefited from a US$100 million additional financing from IDA (project approved on June 10, 2020). The restructuring of the Disbursement Linked Indicator for work permits will enable better formalization of Syrian labor. Additional results areas will cover social protection and decent work, digital financial inclusion, entrepreneurship, women economic empowerment and export development. The project has been extended by two years to January 2023. In the new program, a substantial jump in digital financial inclusion has taken place during the COVID 19 crisis (only aggregate data available). In the parent program, the DLI#4 related to Customs Golden List++ has been achieved. Only slight delays were induced by the COVID 19 crisis: the implementation of the predictability of business regulations reform has been paused because Jordan has been governed by Defense Orders during the confinement period (DLI#3.4) and the licensing law of Greater Amman Municipality has not yet been approved by Parliament and therefore not implemented (DLI#3.5). Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P159522 IBRD-86510 Effective USD 149.00 149.00 0.00 143.47 5.53 96% P159522 IDA-59090 Effective USD 100.00 100.00 0.00 96.29 3.71 96% Not P159522 IDA-66450 USD 100.00 100.00 0.00 0.00 100.00 0% Effective P159522 TF-A3648 Effective USD 51.00 51.00 0.00 49.11 1.89 96% 6/28/2020 Page 1 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P159522 IBRD-86510 Effective 27-Sep-2016 09-Oct-2016 24-Oct-2016 31-Jan-2021 31-Jan-2021 P159522 IDA-59090 Effective 27-Sep-2016 09-Oct-2016 24-Oct-2016 31-Jan-2021 31-Jan-2021 Not P159522 IDA-66450 10-Jun-2020 -- -- 31-Jan-2023 31-Jan-2023 Effective P159522 TF-A3648 Effective 27-Sep-2016 09-Oct-2016 24-Oct-2016 31-Jan-2021 31-Jan-2021 Program Action Plan Action Description Put in place a PMU within MOPIC to monitor the implementation of the Compact and PforR. Source DLI# Responsibility Timing Timing Value Status Technical Client Due Date 26-Oct-2016 Completed Completion Measurement Compact PMU housed at MoPIC. Comments Action Description Issue a Prime Minister decree appointing the AB as a third-party verifier. Source DLI# Responsibility Timing Timing Value Status Other Client Due Date 24-Oct-2016 Completed Completion Measurement . Comments Action Description Develop an Operations Manual for the PforR ‘Economic Opportunities for Jordanians and Syrian Refugees’. Source DLI# Responsibility Timing Timing Value Status Technical Client Due Date 29-Dec-2017 Completed The first draft of the Operations Manual was submitted to the World Bank and an amended version was completed in Completion Measurement December 2017. Comments Extend the period of free work permits and relaxed inspections targeting Syrian refugees for the next two years Action Description (target date: September 2016) Source DLI# Responsibility Timing Timing Value Status 6/28/2020 Page 2 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) Other Client Due Date 09-Apr-2018 Completed The period for free work permits and relaxed on Syrian refugees inspections (sometimes called the “grace period”) Completion Measurement has been extended through December 2019 Comments Disseminate information regarding eligibility, administrative process, and service standards for obtaining work permits Action Description and Ministry of the Interior ID cards (target date: biannually starting September 2016) Source DLI# Responsibility Timing Timing Value Status Technical Client Recurrent Semi-Annually Completed MOL has published the work permit procedures for Syrians in a clearer, more accessible format. MOI has published Completion Measurement the MOI card procedures for Syrians refugees. Comments Monitor and report quarterly: the number of work permits applied for and the number issued, disaggregated by new, Action Description renewal work permits, change of employer , as well as by gender, sector/occupation, Governorate/camp and nationality. Source DLI# Responsibility Timing Timing Value Status Technical Client Recurrent Quarterly Completed Work permit data for Syrian refugees in camps has been captured since January 2017.Rejected work permits are not Completion Measurement being tracked due to technical limitations of IT systems. The number of work permits disaggregated by governorate, gender, sector. Comments Develop and implement a system that allows residents of refugee camps to enjoy mobility to search for and attend Action Description work and put in place an advisory committee including members from the World Bank, ILO, UNHCR, and the International NGO (INGO) forum. Source DLI# Responsibility Timing Timing Value Status Technical Client Due Date 30-Dec-2016 Completed The Advisory Committee was formed and met for the first time in March 2017 and then in June 2017. Completion Measurement MOL, UNHCR and ILO have constructed employment offices at Za’atari Camp, and at Azraq Camp. Comments 6/28/2020 Page 3 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) Monitor and report quarterly the number of leave permits applied for, the number received, and the frequency of use, Action Description disaggregated by camp, gender, and age (quarterly, starting January 2017). Source DLI# Responsibility Timing Timing Value Status Technical Client Recurrent Quarterly Completed MOI tracking system is now capturing data with the necessary disaggregation beginning April 2017. Around 121,1884 leave permits from July - September 2019. Completion Measurement The MOI has shared the date disaggregated by Camp, Month, and Gender. Comments Include refugees and economic migrants in the Department of Statistics Employment and Unemployment Surveys Action Description (quarterly, starting January 2017). Source DLI# Responsibility Timing Timing Value Status Technical Client Recurrent Quarterly Completed Completion Measurement Labor Force Surveys were completed and preliminary results released for 2017 and 2018. Comments Carry out an awareness-raising campaign regarding household enterprises to inform the public about the availability Action Description of this option and the reduced restrictions and incentives to foster the creation of such businesses. Source DLI# Responsibility Timing Timing Value Status Technical Client Due Date 31-Dec-2020 Completed Completion Measurement The awareness campaign was launched in Oct 2017 with the cooperation with USAID LENS. Comments Instruct the JIC to recruit 26 high caliber staff with relaxed salary constraints as recently allowed by the Cabinet Action Description (target date: June 2017) Source DLI# Responsibility Timing Timing Value Status Technical Client Due Date 30-Jun-2017 Completed Completion Measurement A Director for Investment Promotion has been appointed. Comments Publish and publicize an ‘investor’s guide’ for domestic and foreign investors with specific information for Syrian Action Description investors and other restricted nationalities. 6/28/2020 Page 4 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) Source DLI# Responsibility Timing Timing Value Status Technical Client Due Date 29-Dec-2017 Completed The Investor’s Guide and a separate “mini guide” dedicated specifically to Syrian investors are now published on JIC Completion Measurement website. Comments Set up a Client Relationship Management (CRM) information technology (IT) system and database for investor Action Description targeting and aftercare at the JIC. Source DLI# Responsibility Timing Timing Value Status Technical Client Due Date 31-Dec-2018 Completed The automated CRM system is in place and being used as the central information collection and tracking point for Completion Measurement JIC. Comments Strengthen the MOL’s Inspectorate Unit’s capacity to identify, track, The Online Grievance Redress (GRM) IT Action Description Platform of the Ministry of Labor becomes live, operational and used by at least 5 staff of the Ministry of Labor (Target date: December 2017) Source DLI# Responsibility Timing Timing Value Status Technical Client Due Date 29-Dec-2017 Completed Completion Measurement The system is now used in 4 directorates by 25 inspectors but cannot be expanded due to technology constraints. Comments The Ministry of Planning and International Cooperation develops an addendum to the Program Operations Manual Action Description covering the additional financing of the PforR Source DLI# Responsibility Timing Timing Value Status The Ministry of Technical Due Date 30-Sep-2020 Not Yet Due Planning and IC Completion Measurement The Ministry of Planning and International Cooperation send the Program Operations Manual to the World Bank. Comments The Department of Statistics communicates to the World Bank the full data from the Labor Force survey, for all Action Description nationalities, quarterly, one month after the end of the quarter and each, year by March 31. Source DLI# Responsibility Timing Timing Value Status 6/28/2020 Page 5 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) DLI 1 The Department of Technical Recurrent Quarterly Not Yet Due Statistics Completion Measurement The Department of Statistics shall communicate to the World Bank the raw data from the Labor Force survey. Comments The Ministry of Interior maintains the system granting leave permits and allowing residents of refugee camps to enjoy Action Description mobility to search for and attend work. Source DLI# Responsibility Timing Timing Value Status DLI 1 The Ministry of Technical Recurrent Continuous In Progress Interior Completion Measurement The number of leave permits granted to Syrian Refugees in camps. Comments The Ministry of Labor extends the period of free work permits and relaxed inspections targeting Syrian refugees until Action Description the project closure. Source DLI# Responsibility Timing Timing Value Status DLI 1 The Ministry of Technical Recurrent Continuous In Progress Labor The Ministry of Labor or the cabinet issues a Decision extending the grace period, including free work permits for Completion Measurement Syrians and relaxed labor inspections. Comments The Ministry of Labor introduces the ISCO Major Groups of the ISCO-08 classification of occupations and uses it to Action Description issue work permits Source DLI# Responsibility Timing Timing Value Status DLI 1 The Ministry of Technical Due Date 01-Jul-2021 Not Yet Due Labor The Ministry of Labor introduces the ISCO Major Groups of the ISCO-08 classification of occupations and uses it to Completion Measurement issue work permits to Syrians. Comments Action Description The Ministry of Labor adopts the ISCO-08 classification of occupations and uses it to issue work permits Source DLI# Responsibility Timing Timing Value Status DLI 1 The Ministry of Technical Due Date 31-Jan-2022 Not Yet Due Labor 6/28/2020 Page 6 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) The Ministry of Labor will share with the World Bank documentation showing the adoption of the ISCO-08 Completion Measurement classification of occupations in its procedures to issue work permits and its IT systems. Comments The Ministry of Labor, in coordination with the World Bank, puts in place a feedback mechanism related to the new Action Description work permits regime for Syrians. Source DLI# Responsibility Timing Timing Value Status DLI 1 The Ministry of Technical Recurrent Yearly Not Yet Due Labor Completion Measurement The feedback or survey results shall be communicated by the Ministry of Labor to the World Bank Comments The Ministry of Labor implements the national Integrated Inspection Management System that has been developed in Action Description accordance with the Inspection and Monitoring Law of 2017 Source DLI# Responsibility Timing Timing Value Status DLI 6 The Ministry of Technical Due Date 31-Dec-2021 Not Yet Due Labor Completion Measurement The Ministry of Labor sends World Bank the System Validation Report against design specifications. Comments MOLA and GAM in coordination with MITS conduct yearly national communication campaigns informing the public, Action Description including Syrians, about the regulatory framework for home-based businesses and virtual offices. Source DLI# Responsibility Timing Timing Value Status Technical DLI 7 MOLA and GAM Recurrent Yearly Not Yet Due Completion Measurement The Communication campaigns shall be made publicly available. Comments The Ministry of Social Development conducts a country-wide, multimedia communication campaign publicizing the Action Description licensing modalities in the childcare sector. Source DLI# Responsibility Timing Timing Value Status DLI 8 The Ministry of Technical Due Date 30-Dec-2021 Not Yet Due Social Development Completion Measurement The communication campaign shall be made publicly available. Comments 6/28/2020 Page 7 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) The Ministry of Labor produces an annual report on grievance-redress mechanisms, with a content to be specified in Action Description the POM including but not limited to the nature and origin of workers complaints, actions taken, and status of resolution. Source DLI# Responsibility Timing Timing Value Status Technical DLI 6 Ministry of Labor Recurrent Yearly Not Yet Due Completion Measurement The annual inspection and GRM report is made public on the Ministry of Labors website. Comments The Ministry of Labor maintains an ICT-based grievance and redress mechanisms (GRM) system for handling, Action Description tracking, and reporting on all public grievances and train the responsible staff to operate the system. Source DLI# Responsibility Timing Timing Value Status Environmental and Social DLI 6 The Ministry of Recurrent Continuous In Progress Systems Labor Completion Measurement The GRM system will be consulted during World Bank implementation support missions Comments The Ministry of Labor issues instructions detailing the implementation modalities of the bylaw regulating work in Action Description agriculture and publish them in the official Gazette. Source DLI# Responsibility Timing Timing Value Status DLI 6 The Ministry of Technical Due Date 31-Mar-2021 Not Yet Due Labor Completion Measurement The instructions will be published in the official Gazette. Comments The Ministry of Labor issues inspection manuals providing inspection guidelines for labor inspectors in all sectors, Action Description including agriculture and trains 30% of inspectors on use. Source DLI# Responsibility Timing Timing Value Status DLI 6 The Ministry of Technical Due Date 31-Dec-2021 Not Yet Due Labor Completion Measurement The Ministry of Labor shall communicate the manuals and training records to the World Bank Comments The Central Bank of Jordan commissions annual satisfaction surveys towards individuals holding e-wallets and basic Action Description bank accounts 6/28/2020 Page 8 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) Source DLI# Responsibility Timing Timing Value Status DLI 6 The Central Bank of Technical Recurrent Yearly Not Yet Due Jordan Completion Measurement The Survey results shall be communicated by the Central Bank of Jordan to the World Bank Comments Ministry of Agriculture prepares guidelines for the safe application of pesticides for different agriculture products and Action Description makes those guidelines available online on the MoA website and include them in in the extension services Source DLI# Responsibility Timing Timing Value Status Environmental and Social DLI 11 Ministry of Due Date 30-Jun-2021 Not Yet Due Systems Agriculture Completion Measurement The Guidelines are disclosed in the website of MoA and included in the plans for extension services Comments MoSD produces and delivers training plan for childcare care givers covering all aspects of the bylaws, and including a Action Description specific module covering first aid, child well-being for babies and toddlers, identification of development delays and child abuse. Source DLI# Responsibility Timing Timing Value Status DLI 9 The Ministry of Technical Due Date 30-Sep-2022 Not Yet Due Social Development The Ministry of Social Development will share the training plan and delivery modalities on the ground with the World Completion Measurement Bank. Comments The Ministry of Social Development commissions annual satisfaction surveys towards parents using licensed Action Description childcare entities Source DLI# Responsibility Timing Timing Value Status DLI 9 The Ministry of Technical Recurrent Yearly Not Yet Due Social Development Completion Measurement The Survey results shall be communicated by the Ministry of Social Development to the World Bank Comments Risks Systematic Operations Risk-rating Tool 6/28/2020 Page 9 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Moderate Moderate Moderate Macroeconomic Substantial Moderate Moderate Sector Strategies and Policies High Moderate Moderate Technical Design of Project or Program Moderate Moderate Moderate Institutional Capacity for Implementation and Substantial Moderate Moderate Sustainability Fiduciary Moderate Moderate Moderate Environment and Social Substantial Moderate Moderate Stakeholders High Moderate Moderate Other -- Substantial Substantial Overall High Moderate Moderate RiskComments Comments The overall risk rating is moderate. Other risks: COVID-19-induced crisis and vulnerabilities. This risk is rated as substantial given the uncertainties brought by the health crisis and its potential future waves, possibly leading to further lockdowns and pauses in economic activities in Jordan and its trading partners. The risks in this ISR have been adjusted according to the new risk framework, where residual risk is assessed after mitigation measures are accounted for. Results PDO Indicators by Objectives / Outcomes Improving Labor Market IN00859653 ►PDO Indicator 1: Number of work permits issued to Syrian refugees each calendar year (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 5,300.00 40,024.00 13,296.00 90,000.00 Date 08-Apr-2016 30-Nov-2019 31-May-2020 30-Dec-2022 Comments IN00859680 of which issued to Syrian women (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 260.00 -- 683.00 5,000.00 Date 08-Apr-2016 -- 31-May-2020 30-Dec-2022 Improving Investment Climate 6/28/2020 Page 10 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) IN00859652 ►PDO Indicator 2: Share of business owners who have accessed more predictable and simplified business regulation (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 7.50 7.50 7.50 51.00 Date 30-Apr-2018 12-Dec-2019 30-Apr-2018 30-Dec-2022 A survey to update this number will take place in a year to give time for reforms to bear fruits and have impact. Comments No measurement has taken place since the baseline. Hence, the constant number. Improving Investment Promotion IN00859651 ►PDO Indicator 3: Investment promotion agency capability score (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 3.00 4.20 4.20 5.00 Date 08-Apr-2016 12-Dec-2019 12-Dec-2019 30-Dec-2022 Comments Improving Formality and Working Conditions IN00859641 ►PDO Indicator 4: Number of private sector workers registered in social security (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 775,058.00 -- 775,058.00 1,000,000.00 Date 31-Dec-2019 -- 31-Dec-2019 30-Dec-2022 Comments IN00859689 Number of female private sector workers registered in social security (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 240,742.00 -- 240,742.00 300,000.00 Date 31-Dec-2019 -- 31-Dec-2019 30-Dec-2022 IN00859692 Number of Syrian private sector workers registered in social security (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 12,854.00 -- 12,854.00 50,000.00 Date 31-Dec-2019 -- 31-Dec-2019 30-Dec-2022 Improving Entrepreneurship IN00859610 6/28/2020 Page 11 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) ►PDO Indicator 5: Number of officially established home-based businesses (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 1,000.00 -- 1,040.00 5,500.00 Date 20-Feb-2020 -- 12-Jun-2020 30-Dec-2022 Comments IN00859677 of which owned by women (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 100.00 -- 625.00 3,300.00 Date 20-Feb-2020 -- 12-Jun-2020 30-Dec-2022 IN00859684 of which owned by Syrians (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 100.00 -- 22.00 550.00 Date 20-Feb-2020 -- 12-Jun-2020 30-Dec-2022 Improving Digital Financial Inclusion IN00859645 ►PDO Indicator 6: Number of e-wallets and Basic Bank Accounts (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 620,328.00 -- 1,008,220.00 1,250,000.00 Date 31-Dec-2019 -- 12-Jun-2020 30-Dec-2022 Comments IN00859678 of which women (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 202,036.00 -- 202,036.00 450,000.00 Date 20-Feb-2020 -- 31-Dec-2019 30-Dec-2022 IN00859681 of which Syrians (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 18,030.00 -- 18,030.00 50,000.00 Date 31-Dec-2019 -- 31-Dec-2019 30-Dec-2022 Improving Women Economic Opportunities IN00859646 6/28/2020 Page 12 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) ►PDO Indicator 7: Number of workers employed in the e-licensed childcare Facilities (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 10,000.00 Date 20-Feb-2020 -- 12-Jun-2020 30-Dec-2022 Comments IN00859679 of which women (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 9,000.00 Date 20-Feb-2020 -- 12-Jun-2020 30-Dec-2022 Improving Export Competitiveness IN00859644 ►PDO Indicator 8: Number of direct jobs created in post-harvest logistics for select exports of fresh produce (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 3,000.00 Date 20-Feb-2020 -- 12-Jun-2020 30-Dec-2022 Comments IN00859682 of which for women (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 1,500.00 Date 20-Feb-2020 -- 12-Jun-2020 30-Dec-2022 IN00859687 of which for Syrians (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 1,000.00 Date 20-Feb-2020 -- 12-Jun-2020 30-Dec-2022 Intermediate Results Indicators by Results Areas Improving Labor Market IN00859650 ►IR Indicator 1: Annual public disclosure by Better Work Jordan of factory-level compliance with a list of at least 29 social and environmental-related items (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target 6/28/2020 Page 13 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) Value No Yes No Yes Date 08-Apr-2016 17-Jun-2019 12-Jun-2020 31-Dec-2020 Comments Improving Investment Climate IN00859649 ►IR Indicator 2.1: Identification and adoption of a predictability process for issuance of business regulations following an inclusive public- private dialogue and a measurement system (including baseli (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No Yes Yes Yes Date 08-Apr-2016 17-Jun-2019 12-Jun-2020 30-Dec-2022 Comments IN00859655 ►IR Indicator 2.2: Share of business regulations mandatory to the private sector issued following the adopted predictability process (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 70.00 Date 08-Apr-2016 17-Jun-2019 12-Jun-2020 30-Dec-2022 Comments IN00859659 ►IR Indicator 2.3: Number of officially established household enterprises (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 50.00 806.00 1,040.00 1,000.00 Date 08-Apr-2016 17-Jun-2019 12-Jun-2020 30-Dec-2022 Comments IN00859686 of which Syrian-owned (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 22.00 100.00 Date 08-Apr-2016 17-Jun-2019 12-Jun-2020 30-Dec-2022 IN00859691 of which women-owned (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 572.00 625.00 100.00 Date 08-Apr-2016 17-Jun-2019 12-Jun-2020 30-Dec-2022 IN00859664 6/28/2020 Page 14 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) ►IR Indicator 2.4: Identification of one key business regulatory reform following an inclusive public-private dialogue and a measurement system (including baseline identification) (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No Yes Yes Yes Date 08-Apr-2016 17-Jun-2019 12-Jun-2020 30-Dec-2022 Comments IN00859665 ►IR Indicator 2.5: Reduction of regulatory burden for the private sector following the implementation of the business regulatory reform (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 30.00 Date 08-Apr-2016 17-Jun-2019 12-Jun-2020 30-Dec-2022 Comments IN00859666 ►IR Indicator 2.6: Increase in the number of enterprises in the Customs Golden List (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 173.00 533.00 300.00 Date 08-Apr-2016 17-Jun-2019 12-Jun-2020 30-Dec-2022 Comments Improving Investment Promotion IN00859647 ►IR Indicator 3.1 Number of investments benefitting from investment facilitation by the JIC (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 305.00 455.00 530.00 Date 08-Apr-2016 17-Jun-2019 31-Mar-2020 30-Dec-2022 Comments Improving Formality and Working Conditions IN00859648 ►IR Indicator 4.1: MoL issues a bylaw specifying acceptable working conditions in the agriculture sector informed by the ILO Recommendations R204 and R133 (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 20-Feb-2020 -- 12-Jun-2020 30-Dec-2022 Comments IN00859658 6/28/2020 Page 15 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) ►IR Indicator 4.2: The Ministry of Labor implements the national Integrated Inspection Management System that has been developed in accordance with the Inspection and Monitoring Law of 2017 (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 20-Feb-2020 -- 12-Jun-2020 30-Dec-2022 Comments Improving Digital Financial Inclusion IN00859642 ►IR Indicator 5.1: Number of additional awareness and financial literacy campaigns to promote financial inclusion (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 3.00 Date 20-Feb-2020 -- 20-Feb-2020 30-Dec-2022 Comments IN00859657 ►IR Indicator 5.2: Number of e-wallets active in the last 30 days (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 67,000.00 -- 67,000.00 200,000.00 Date 31-Dec-2019 -- 31-Dec-2019 30-Dec-2022 Comments IN00859683 Number of active e-wallets for women (Number, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 22,083.00 -- 22,083.00 75,000.00 IN00859688 Number of active e-wallets for Syrians (Number, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 1,983.00 -- 1,983.00 10,000.00 IN00859662 ►IR Indicator 5.3. Number of Merchants accepting digital payments (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 1,000.00 -- 1,000.00 10,000.00 Date 20-Feb-2020 -- 20-Feb-2020 30-Dec-2022 Comments IN00859663 6/28/2020 Page 16 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) ►IR Indicator 5.4. Number of digital transactions per month (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 235,559.00 -- 235,559.00 500,000.00 Date 31-Dec-2019 -- 31-Dec-2019 30-Dec-2022 Comments Improving Women Economic Opportunities IN00859609 ►IR Indicator 6.1: Number of active childcare facilities e-licensed by the Ministry of Social Development (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 2,500.00 Date 20-Feb-2020 -- 12-Jun-2020 30-Dec-2022 Comments IN00859660 ►IR Indicator 6.2: Number of children benefiting from formal childcare services (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 25,000.00 Date 20-Feb-2020 -- 12-Jun-2020 30-Dec-2022 Comments IN00859661 ►IR Indicator 6.3: Number of communication campaigns addressing social norms impeding women economic opportunities (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 3.00 Date 20-Feb-2020 -- 12-Jun-2020 30-Dec-2022 Comments Improving Export Competitiveness IN00859643 ►IR Indicator 7.1. Increase in export value of Agricultural produce in select areas (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 40.00 Date 20-Feb-2020 -- 12-Jun-2020 30-Dec-2022 Comments IN00859656 6/28/2020 Page 17 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) ►IR Indicator 7.2. Reduction in time to export agricultural fresh produce to GCC and EU (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 50.00 Date 20-Feb-2020 -- 12-Jun-2020 30-Dec-2022 Comments Disbursement Linked Indicators DLI_IND_TABLE ►DLI 1 1: Number of Work Permits issued to to Syrians in calendar year 2020 (Output, 4,301,960.00, 0%) All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value 5,300.00 -- 13,296.00 90,000.00 Date 08-Apr-2016 -- 31-May-2020 -- Comments ►DLI 2 2: Annual public disclosure by Better Work Jordan of report on factory-level compliance with a list of at least 29 social and environmental-related items (Process, 20.00, 0%) All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value No Yes No Yes Date 08-Apr-2016 25-Nov-2019 12-Jun-2020 -- In close coordination with MoL’s inspection department, BWJ continues inspecting factories, a process which Comments began in early January 2017. ►DLI 3 3: Establishment and implementation of selected simplified and predictable regulations for the private sector, including household businesses (Output, 70.00, 0%) All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Reforms being Reforms being Reforms Value No reform implemented. implemented implemented implemented Date 08-Apr-2016 12-Dec-2019 12-Jun-2020 -- Comments DLI 3.1 DLR 3.1: A reform establishing a predictability process for issuance of business regulations has been identified and adopted following an inclusive public-private dialogue and a measurement system (in (Output, 15.00, 0%) 6/28/2020 Page 18 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) Unit of Measure: Yes/No Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value No Yes Yes Yes Date -- 25-Nov-2019 12-Jun-2020 -- Comments DLI 3.2 DLR 3.2: One key business regulatory reform has been identified following an inclusive public-private dialogue, and a measurement system covering the time, cost, and complexity of the compliance proce (Output, 15.00, 0%) Unit of Measure: Yes/No Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value No Yes Yes Yes Date -- 25-Nov-2019 12-Jun-2020 -- Comments DLI 3.3 DLR 3.3: 1000 officially established household enterprises, of which 100 are Syrian refugee owned and 100 female owned. (Output, 20.00, 0%) Unit of Measure: Number Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value 50.00 841.00 1,040.00 1,000.00 Date -- 25-Nov-2019 12-Jun-2020 -- Comments DLI 3.4 DLR 3.4: 70 percent of business regulations mandatory to the private sector have been issued following the predictability process adopted under DLR 3.1. (Output, 10.00, 0%) Unit of Measure: Yes/No Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value No No No Yes Date -- 25-Nov-2019 12-Jun-2020 -- Comments 6/28/2020 Page 19 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) DLI 3.5 DLR 3.5: Regulatory burden on businesses has decreased by 30 percent following implementation of business regulatory reform adopted under DLR 3.2. (Output, 10.00, 0%) Unit of Measure: Yes/No Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value No No No Yes Date -- 25-Nov-2019 12-Jun-2020 -- Comments ►DLI 4 4: Increase in number of enterprises on the Customs Golden List (Output, 20.00, 0%) All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value 0.00 179.00 533.00 300.00 Date 08-Apr-2016 25-Nov-2019 12-Jun-2020 -- Comments ►DLI 5 5: Number of investments benefitting from investment facilitation by JIC (Output, 60.00, 0%) All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value 0.00 392.00 455.00 530.00 Date 08-Apr-2016 25-Nov-2019 12-Jun-2020 -- Comments ►DLI 6 Number of private sector workers registered in national social security system in 2021 (Outcome, 7,000,000.00, 0%) All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value 775,058.00 -- 775,058.00 1,000,000.00 Date -- -- 31-Dec-2019 -- Comments DLI 6.1 of which are women (Outcome, 1,000,000.00, 0%) Unit of Measure: Number 6/28/2020 Page 20 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value 240,742.00 -- 240,742.00 300,000.00 Date -- -- 31-Dec-2019 -- Comments DLI 6.2 of which are Syrians (Outcome, 6,000,000.00, 0%) Unit of Measure: Number Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value 12,854.00 -- 12,854.00 50,000.00 Date -- -- 31-Dec-2019 -- Comments DLI 6.3 Ministry of Labor issues a bylaw specifying acceptable working conditions in the agriculture sector informed by the ILO Recommendations R204 and R133 and publishes it in the Official Gazette (Output, 2,000,000.00, 0%) Unit of Measure: Yes/No Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value No -- No Yes Date -- -- 12-Jun-2020 -- Comments DLI 6.4 Number of labor inspections recorded in the national Integrated Inspection Management System, developed by the Ministry of Industry Trade and Supply (Intermediate Outcome, 3,000,000.00, 0%) Unit of Measure: Number Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value 0.00 -- 0.00 15,000.00 Date -- -- 12-Jun-2020 -- Comments 6/28/2020 Page 21 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) ►DLI 7 Number of officially established and registered home-based businesses (Outcome, 7,000,000.00, 0%) All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value 1,000.00 -- 1,040.00 5,500.00 Date -- -- 12-Jun-2020 -- Comments DLI 7.1 of which are owned by women (Outcome, 1,000,000.00, 0%) Unit of Measure: Number Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value 100.00 -- 625.00 3,300.00 Date -- -- 12-Jun-2020 -- Comments DLI 7.2 of which are owned by Syrians (Outcome, 6,000,000.00, 0%) Unit of Measure: Number Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value 100.00 -- 22.00 550.00 Date -- -- 12-Jun-2020 -- Comments DLI 7.3 MoI issues a circular, sends to GoJ entities and publishes it on MoI website, stating that MoI ID Card is valid for Syrians to register business, open e-wallets, buy SIMcards, obtain a driving license (Output, 3,000,000.00, 0%) Unit of Measure: Yes/No Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value No -- No Yes Date -- -- 12-Jun-2020 -- Comments 6/28/2020 Page 22 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) ►DLI 8 Number of e-wallets or Basic Bank Accounts registered (Outcome, 10,000,000.00, 0%) All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value 620,328.00 -- 1,008,220.00 1,250,000.00 Date -- -- 12-Jun-2020 -- Comments DLI 8.1 of which are owned by women (Intermediate Outcome, 1,000,000.00, 0%) Unit of Measure: Number Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value 202,036.00 -- 202,036.00 450,000.00 Date -- -- 31-Dec-2019 -- Comments DLI 8.2 of which are owned by Syrians (Outcome, 6,000,000.00, 0%) Unit of Measure: Number Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value 18,030.00 -- 18,030.00 50,000.00 Date -- -- 31-Dec-2019 -- Comments ►DLI 9 Number of active childcare Facilities e-licensed by the Ministry of Social Development (Outcome, 10,000,000.00, 0%) All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value 0.00 -- 0.00 2,500.00 Date -- -- 12-Jun-2020 -- Comments DLI 9.1 Following a structured public-private dialog, MOSD issues an instruction governing the licensing of home-based childcare and enacts such instruction through its publication in the Official Gazette (Output, 2,000,000.00, 0%) 6/28/2020 Page 23 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) Unit of Measure: Yes/No Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value No -- No Yes Date -- -- 12-Jun-2020 -- Comments DLI 9.2 Following a structured public-private dialog, MOL issues an instruction implementing Article 72B of the Labor Law and enacts said instruction through its publication in the Official Gazette (Output, 1,500,000.00, 0%) Unit of Measure: Yes/No Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value No -- No Yes Date -- -- 12-Jun-2020 -- Comments ►DLI 10 Jordan National Commission for Women (“JNCW”) conducts a nationwide, multimedia campaign spanning TV, print, online and social media, addressing social norms and gender roles related to women at work (Output, 500,000.00, 0%) All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value No -- No Yes Date -- -- 12-Jun-2020 -- Comments DLI 10.1 JNCW conducts a nationwide, multimedia campaign spanning TV, print, online and social media, addressing benefits of childcare, digital financial services, entrepreneurship and waged employment (Output, 1,000,000.00, 0%) Unit of Measure: Yes/No Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value No -- No Yes Date -- -- 12-Jun-2020 -- Comments 6/28/2020 Page 24 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) DLI 10.2 JNCW produces educational content targeting children and addressing social norms related to women at work (Output, 500,000.00, 0%) Unit of Measure: Yes/No Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value No -- No Yes Date -- -- 12-Jun-2020 -- Comments DLI 10.3 JNCW conducts a targeted, multimedia and outreach campaign spanning print, online and social media targeting Syrian women addressing social norms related to women at work (Output, 2,000,000.00, 0%) Unit of Measure: Yes/No Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value No -- No Yes Date -- -- 12-Jun-2020 -- Comments DLI 10.4 JNCW carries out an assessment of the four social norms campaigns and produces a report of its findings, including outreach and impact data (Output, 500,000.00, 0%) Unit of Measure: Yes/No Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value No -- No Yes Date -- -- 12-Jun-2020 -- Comments ►DLI 11 Following a structured public-private dialog, MoA issues and publishes standard operating procedures for the post-harvest and cold- chain logistics for three types of fresh agricultural produce (Intermediate Outcome, 7,000,000.00, 0%) All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value No -- No Yes Date -- -- 12-Jun-2020 -- 6/28/2020 Page 25 of 26 The World Bank Implementation Status & Results Report Economic Opportunities for Jordanians and Syrian Refugees PforR (P159522) Comments DLI 11.1 Ministry of Agriculture conducts an assessment of the agricultural subsidies, support schemes, incl. water, and import tariffs related to agricultural products and presents it to Council of Ministers (Output, 1,000,000.00, 0%) Unit of Measure: Yes/No Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value No -- No Yes Date -- -- 12-Jun-2020 -- Comments DLI 11.2 Ministry of Agriculture adopts a strategy, for each region, optimizing agricultural subsidies towards the most water-efficient crops (Output, 1,000,000.00, 0%) Unit of Measure: Yes/No Indicator Type: All new DLIs achieved by Baseline Actual (Previous) Actual (Current) December 31, 2022 Value No -- No Yes Date -- -- 12-Jun-2020 -- Comments 6/28/2020 Page 26 of 26