First Round Stakeholder Engagement for Environmental and Social Impact Assessment on Sichuan Water Supply and Sanitation PPP Project March 1st, 2019 (Draft) I. Project Overview Name: Sichuan Water Supply and Sanitation PPP Project Location: Jingyang District, Deyang City, Sichuan Province Construction Unit: Housing and Urban-Rural Construction Bureau of Jingyang District, Deyang City Construction Type: new construciton, reconstruction and expansion Investment: 131,600 Main Construction Contents: to reconstruct and newly-built facilities for water supply and drainage, and to evaluate existing assets in 11 villages and towns in Jingyang District of Deyang as well as to improve certain part of water environment in the area. Project Contents: New construction or reconstruction of drinking system (water intake facilities, water production and water supply plant stations, water 1 transmission and distribution network, household facilities), drainage system (centralized or decentralized treatment facilities, collection network, household facilities), other water environment improvement projects (local river regulation, toilet reconstruction, etc.) and ‘cloud platform’ of intelligent management. At the same time, stock projects are included, namely, the existing water supply and drainage facilities in towns and villages, the existing drinking system facilities (water supply stations and water supply network), and the sewage pipeline network under construction. According to the preliminary implementation plan of PPP, during the concession period, all the stock subprojects are transferred to the PPP Project Company for operation and maintenance, and projects under construction will be transferred after completion. Sewage treatment facilities and water supply stations in the stock projects need to be reconstructed by the project company. II. Summary of potential impacts of construction projects on the environment and management measures Water Supply 1. In Construction period (1) Exhaust gas Construction dust: During the whole construction period, the dust generated will be controlled by a series of measures to reduce its impact on ambient air. The measures include: enclosing construction site; using dense mesh safety network; regular water spraying on the ground; timely removal of slag and spoil scattered on the road surface; using hard pavement for major transport routes if possible; forbidding overload of dump truck, garbage truck and other transport vehicles; tire- cleaning before leaving the site; covering exposed materials with blanket; and placing dust-proof cushions at the exit of construction area. Mechanical exhaust: During the construction period, the use of motor vehicles to transport raw materials, equipment and construction machinery and other equipment will emit certain amount of exhaust gas, which is small in quantity and 2 construction site, intermittent. Considering the good diffusion condition of the project this kind of exhaust gas can meet emission standards. (2) waste water During the construction period, wastewater generated in construction will be reused after treatment in temporary sedimentation basin, and will not be discharged; wastewater in pressure test of the pipe network will be reused in construction and will be discharged neither; and sanitary wastewater from constructors will be treated by the existing sewage treatment facilities of the surrounding farmers. (3) Noise Construction noise will be controlled by the following measures: making a reasonable construction time arrangement and a construction scheme; prohibiting construction at night; selecting low noise construction technology, equipment and construction machinery; carefully completing the floor plan and following civilized construction; strictly controlling noise in accordance with relevant standards; taking noise elimination and insulation measures when necessary. All above are aimed to effectively prevent the noise disturbing people. (4)solid waste Solid waste generated during construction mainly include earthwork, construction waste and domestic garbage. Part of the earthwork is used for backfilling of the site, and the rest is to be disposed of. The part to be disposed is transported to the designated site. Construction waste and domestic garbage, after centralized collection, are regularly sent to the domestic waste disposal site for centralized processing. (5)traffic During the construction period, pipe network construction has a significant impact on road traffic. It should be carefully planned and promptly constructed. Pipe jacking may be adopted. Before construction, temporary driving routes should be worked out in consultation with local traffic management departments, residents in 3 be erected at the the affected areas should be informed in advance, signs should construction site and special personnel should be designated to guide traffic. In addition, to prevent traffic jams, measures to ensure the management of construction and to shorten the construction period and other feasible means should also be taken into consideration. (6)safety Find out the exact location of underground installations, such as water supply and drainage, gas, power cables, telecommunication lines, etc. And the designer, the supervisor and the project leader should recheck them on the site before excavation. The main construction scope of this project is located in rural area and its surroundings. Thus, the existing facilities can be used to accommodate the workers and construction camps are not needed. Constructors for this project are mainly local people; migrant workers are few. Thus, there will be no problems relating to influx of workers (normally due to immigration of migrant workers’ family members), nor pressure on community services. In addition, labor-related laws and various criminal offences (sexual assault for instance) in China are comprehensive in regulations and strict in enforcement. 2. In Operation Period (1) Wastewater Wastewater in the project will be treated to meet the standards, and then, part of it will be reused for farmland irrigation and part of it will be discharged into rivers. (2) Exhaust Gas Only a small amount of chlorine dioxide will be generated during the project due to the use of disinfectants, which will have little impact on ambient air and public health. (3)Noise After completion, the project will be on operation period, during which, all kinds of pumps, by placing sound insulation cover and vibration attenuation cushion, using acoustic absorption materials in walls to fulfill plants sound 4 insulation, and strengthening maintenance during operation, can achieve standard discharge. Thus, there will be little impact on the surrounding environment. (4)solid waste During the operation period of the project, solid wastes are sand, sludge and domestic garbage. screenings is transported to the local landfill for landfill treatment; sludge will be disposed of properly and domestic garbage are regularly cleared and transported by the environmental sanitation department. Drainage 1. In Construction period (1) Exhaust gas Construction dust: During the whole construction period, the dust generated will be controlled by a series of measures to reduce its impact on ambient air. The measures include: closing construction site; using dense mesh safety network; regular water spraying on the ground; timely removal of slag and soil scattered on the road surface; using hard pavement for major transport routes if possible; forbidding overload of dump truck, garbage truck and other transport vehicles; tire-cleaning before leaving the site; covering exposed materials with blanket; and placing dust- proof cushions at the exit of construction area. Mechanical exhaust: During the construction period, the use of motor vehicles to transport raw materials, equipment and construction machinery and other equipment will emit certain amount of mechanical exhaust gas, which is small in quantity and discontinuous in time. Considering the good diffusion condition of the project construction site, this kind of mechanical exhaust can meet emission standards. (2)waste water During the construction period, wastewater generated in construction will be reused after treatment in temporary sedimentation basin, and will not be discharged; wastewater in pressure test of the pipe network will be reused in construction 5 and will be discharged neither; and sanitary wastewater from constructors will be treated by the existing sewage treatment facilities of the surrounding farmers. (3)Noise Construction noise will be controlled by the following measures: making a reasonable construction time arrangement and a construction scheme; prohibiting construction at night; selecting low noise construction technology, equipment and construction machinery; carefully completing the floor plan and following civilized construction; strictly controlling noise in accordance with relevant standards; taking noise elimination and insulation measures when necessary. All above are aimed to effectively prevent the noise disturbing people. (4)solid waste Solid waste generated during construction mainly include earthwork, construction waste and domestic garbage. Part of the earthwork is used for backfilling of the site, and the rest is abandoned. The abandoned part is transported to the designated site. Construction waste and domestic garbage, after centralized collection, are regularly sent to the domestic waste disposal site for centralized processing. (5)traffic During the construction period, pipe network construction has a significant impact on road traffic. It should be carefully planned and promptly constructed. Pipe jacking may be adopted. Before construction, temporary driving routes should be worked out in consultation with local traffic management departments, residents in the affected areas should be informed in advance, signs should be erected at the construction site and special personnel should be set up to guide traffic. In addition, to prevent traffic jams, measures to ensure the management of construction and to shorten the construction period and other feasible ones should also be taken into consideration. (6)safety Find out the exact location of underground installations, such 6 as water supply and drainage, gas, power cables, telecommunication lines, etc. And the designer, the supervisor and the project leader should recheck them on the site before excavation. The main construction scope of this project is located in rural area and its surroundings. Thus, the existing facilities can be employed and construction camps are not needed. Constructors for this project are mainly local people; migrant workers are few. Thus, there will be no problems out of population increasing (normally due to immigration of migrant workers’ family members), nor pressure on community services. In addition, labor-related laws and various criminal offences (sexual assault for instance) in China are comprehensive in regulations and strict in enforcement. 2. In Operation Period (1) Wastewater Wastewater in the project will be treated to meet the standards, and then, part of it will be reused for farmland irrigation and part of it will be discharged into sewage river (2)exhaust gas During the operation period, exhaust gas in sewage treatment station mainly refers to stench, such as H2S, NH3 and etc. The project temporarily sets a 50-meter- wide sanitary protection zone, and at the same time, all stench-producing units are sealed and covered, deodorizing devices are installed, exhaust fans are installed, and green plants are planted. By taking the above measures, the sewage treatment station will have very limited impact on ambient air. (3)Noise After completion, the project will be in operation period, during which, the main blowing machines, pumps for sludge concentrating and dewatering system and other kinds within the station can achieve standard discharge by taking measures as placing sound insulation cover and vibration attenuation cushion, using acoustic materials in walls to fulfill plants sound insulation, and strengthening maintenance during very limited. operation. Thus, impact on the surrounding environment will be 7 (4)solid waste During the operation period of the project, grid slag, sediment, sludge and domestic waste are mainly produced. Slag and sediment are transported to the local landfill for landfill treatment; sludge is dewatered and transported to the designated site for unified treatment before being transported to the sludge disposal center for advanced treatment and disposal; domestic waste is regularly cleared and transported by the environmental sanitation department. III. Major Means for Public Opinions (1) Inquiry objects and contents: objects are mainly residents and other stakeholders in the surrounding areas of the project. Welcome comments and suggestions from all walks of life on the environmental protection work of the project. (2) Inquiry means: the public can submit opinions or consult relevant information to the construction unit by telephone, letter, e-mail or directly visit to the construction unit. Contact information of the construction unit: Contact person: Zhou Li Tel: 0838-2506351 E-mail: dyjyppp@163.com Address: B107, People's Government of Jingyang District, Deyang City 8 III. Scope and Main Matters for Public Opinions 1. Scope for public opinions Area within 100 meters around the construction site of water supply project is sensitive spot, and area within 200 meters around the construction site of drainage project is sensitive spot. 2. Main matters for public opinions From the point of view of environmental protection, what attitude do you have towards this project? Please briefly explain the reasons (see appendix 1: the questionnaire). 3. Stakeholders analysis According to the water supply system and drainage system of the project, the environmental stakeholders involved in the project are analyzed. The environmental stakeholders involved in the project are as follows: Table 1-1 Environmental Stakeholders Analysis Form (Public) of PPP (Water Supply) Project for water environment improvement in Jingyang District, Deyang City Towns Villages/communities Names of Stakeholders (exact Predicted Predicted Language Informe methods Special Remarks stakeholders people) households population requirements Xiaoquan Downtown of xiaoquan downtown of residents within 200 80 320 Mandarin Posting and online Water town xiaoquan meters of Xiaoquan water Chinese publicity supply town plant pumping Min’an Village villagers in residents within 200 30 120 Mandarin Posting and online station Min’an meters of Min’an water Chinese publicity supply station Lilang villiage villagers in residents within 200 40 120 Mandarin Posting and online Lilang meters of Liyuan water Chinese publicity supply station 9 Tianyuan Baijiang Villiage villagers in residents within 200 10 40 Mandarin Posting and online Baijiang meters of Jingfu water Chinese publicity supply station Xiaogan Downtown of xiaoquan Xiaogan all people in the Nursing / 80 Mandarin Posting and online Specializ town Nursing house house Chinese publicity ed persons will be sent to the nursing house and answer questions during the elderly’s rest time residents of residents within 200 20 80 Mandarin Posting and online Chinese publicity Xiaogan town meters of Xiangan water supply station Huangxu Downtown of Huangxu residents of households within 200 10 40 Mandarin Posting and online Chinese publicity town Huangxu meters of Huangxu town Waterworks Xinhua Village villagers of households within 200 15 60 Mandarin Posting and online Chinese publicity Xinhua meters of Hongshan water supply station Shuangxuan Village the Wangs villagers within 200 15 60 Mandarin Posting and online Chinese publicity Temple meters of Huilong water supply station Xinlong Village villagers of villagers within 200 20 80 Mandarin Posting and online Chinese publicity Xinlong meters of Xintai water supply station Wuquan Village Villagers of villagers within 200 10 40 Mandarin Posting and online Chinese publicity wuquan meters of Wuquan water 10 supply station Daquan Village villagers of villagers within 200 45 180 Mandarin Posting and online Chinese publicity Daquan meters of Daquan water supply station Dongtai Village villagers of villagers within 200 40 160 Mandarin Posting and online Chinese publicity Dongtai meters of Dongtai water supply station Chaoyang Village villagers of villagers within 200 50 150 Mandarin Posting and online Chinese publicity Chaoyang meters of Chaoyang water supply station Donghu Donghu water supply residents of households within 200 30 120 Mandarin Posting and online Chinese publicity station Donghu town meters of Donghu water supply station Dadi water supply residents of households within 200 15 60 Mandarin Posting and online Chinese publicity station Donghu town meters of Donghu water supply station Yangjia Xinlong water supply villagers of households within 200 20 80 Mandarin Posting and online Chinese publicity station Xinlong meters of Xinlong water supply station Yangjia water supply residents of households within 200 20 80 Mandarin Posting and online Chinese publicity station downtown meters of Yangjia water supply station Fengcheng water supply residents of households within 200 10 40 Mandarin Posting and online Chinese publicity station Fengcheng meters of Fengcheng village water supply station Changsheng water villagers of households within 200 25 100 Mandarin Posting and online Chinese publicity supply station Changjiang meters of Changsheng water supply station Dexin Wuxing water supply Wuxing households within 200 15 60 Mandarin Posting and online Chinese publicity station Village meters of Wuxing water 11 supply station Fuxing water supply Fuxing households within 200 15 60 Mandarin Posting and online Chinese publicity station Village meters of Fuxing water supply station Xinyu water supply Xinyu Village households within 200 20 80 Mandarin Posting and online Chinese publicity station meters of Xinyu water supply station Shengli water supply Shengli households within 200 15 60 Mandarin Posting and online Chinese publicity station Village meters of Shengli water supply station Bailong Town residents of households within 200 20 80 Mandarin Posting and online Chinese publicity Bailong meters of Bailong water supply station Guoyuan Village villagers of households within 200 15 60 Mandarin Posting and online Chinese publicity Guoyuan meters of Guoyuan water supply station Songbai Village villagers of households within 200 10 40 Mandarin Posting and online Chinese publicity Songbai meters of Guoyuan water supply station Qingjin Village villagers of households within 200 15 60 Mandarin Posting and online Chinese publicity Qingjin meters of Qingjin water supply station Longxing Bridge villagers of households within 200 5 20 Mandarin Posting and online Chinese publicity Village Longxing meters of Longxing Bridge Bridge water supply station Qinghe Village villagers of households within 200 10 40 Mandarin Posting and online Chinese publicity Qinghe meters of Qinghe water supply station Shuangdo Longdong Village villagers of Residents within 200 10 40 Mandarin Posting and online 12 ng ongdong meters of Longdong Chinese publicity water supply station Liangshui Village Villagers of residents within 200 20 80 Mandarin Posting and online Chinese publicity Liangshui meters of Liangshui water supply station Zhongxin Village Villagers of residents within 200 15 60 Mandarin Posting and online Chinese publicity Zhongxin meters of Zhongxin water supply station Xinzhong Liuma Village Villagers of residents within 200 15 60 Mandarin Posting and online Chinese publicity Liuma meters of Xinliu water supply station Hexin Longya Village Villagers of residents within 200 20 80 Mandarin Posting and online Chinese publicity Longya meters of Hero Ridge water supply station Dezhong Village Villagers of residents within 200 10 40 Mandarin Posting and online Chinese publicity Changying meters of Changling water supply station Dezhong Village Villagers of residents within 200 15 60 Mandarin Posting and online Chinese publicity Dezhong meters of Dezhong water supply station Xinmin Village Villagers of residents within 200 15 60 Mandarin Posting and online Chinese publicity Xinmin meters of Xinmin water supply station Bailong Bailong Town Surrounding surrounding farmers of Mandarin Posting and online Proposed Chinese publicity farmers proposed waterworks 1 10 waterwor ks 13 Table 1-2 Environmental Stakeholders Analysis Form (Public) of PPP (Water Drainage) Project for Water Environment Control in Jingyang District, Deyang City Category Towns Villages/communities Names of Stakeholders (exact Predicted Predicted Language Informe Special Remarks stakeholders people) household population methods requirements s Sewage Hexin Yongxin Village villagers of villagers within 200 Mandarin Posting and treatment Yongxin meters of the Chinese online plant sewage treatment 20 80 publicity plant in Yongxin Village, Hexin Town Xiaohe Village villagers of villagers within 200 Mandarin Posting and Xiaohe meters of the Chinese online sewage treatment 22 88 publicity plant in Xiaohe Village, Hexin Town downtown area the Cais yard villagers within 200 Mandarin Posting and meters of the Chinese online 11 44 sewage treatment publicity plant in Hexin Town Changshou village villager of villagers within 200 Mandarin Posting and Dezhong meters of the Chinese online sewage treatment 60 240 publicity plant in Changshou Village, Hexin Town students and the southeast of the Mandarin Posting and Use legend School whole faculty of sewage treatment Chinese online New Changshou plant in Changshou publicity Hope Primary Village School Shuan Longdong villagers of villagers within 200 60 240 Mandarin Posting and 14 gdong Village Longdong meters of the Chinese online sewage treatment publicity plant in Longdong Village, ShuangdongTown Zuanshi Village Villagers of Villagers within 200 Mandarin Posting and Zuanshi meters of the Chinese online sewage treatment publicity 28 112 plant in Zuanshi Village, Shuangdong Town Downtown area Residents of Villagers within 200 Mandarin Posting and downtown meters of the Chinese online sewage treatment 18 72 publicity plant in downtown area of Shuangdong Zhongxin Village Villagers of Villagers within 200 Mandarin Posting and Zhongxin meters of the Chinese online sewage treatment publicity 12 48 plant in Zhongxin Village, Shuangdong Town Xinzho Baihe Village Villagers of Baihe Villagers within 200 Mandarin Posting and ng meters of the Chinese online Town sewage treatment publicity 22 88 plant in Baihe Village, Xinzhong Town Ma’an Village Villagers of Villagers within 200 Mandarin Posting and 31 124 Ma’an meters of the Chinese online 15 sewage treatment publicity plant in Ma’an Village, Xinzhong Town Dongh Xinhua Village Villagers of Villagers within 200 Mandarin Posting and u Xinhua meters of NO 1 Chinese online sewage treatment 14 48 publicity plant in Xinzhong Town Villagers within 200 Mandarin Posting and meters of NO. 2 Chinese online sewage treatment 23 92 publicity plant in Xinzhong Town Huang Dongtai (Fuxing) Villagers of Villagers within 200 Mandarin Posting and xu Village Fuxing meters of the Chinese online sewage treatment publicity plant in Dongtai 32 128 (Fuxing), Huangxu Town Chaoyang Village Villagers of Villagers within 200 Mandarin Posting and Chaoyang meters of the Chinese online sewage treatment 5 20 publicity plant in Chaoyang, Huangxu Town Gas Company Villagers within 200 Mandarin Posting and Interview Company meters of the Chinese online sewage treatment publicity plant in Chaoyang, Huangxu Town 16 Tianyu Huajing Village Villagers of the Villagers within 200 Mandarin Posting and an Tangs Yard meters of NO. 1 Chinese online sewage treatment publicity 34 136 plant in Huajing Village, TianyuanTown The Zhous old Villagers within 200 Mandarin Posting and Yard meters of NO. 2 Chinese online sewage treatment publicity plant in Huajing 27 108 Village, TianyuanTown (tentative) Xieyue Village Farm Sensitive spot within Mandarin Posting and Interview Company 200 meters of Chinese online NO. 2 sewage publicity treatment plant in Huajing Village, TianyuanTown (tentative) Villagers and Sensitive spot within Mandarin Posting and businessmen in 200 meters of the Chinese online Xieyue sewage treatment publicity plant in Xieyue 25 270 Village, TianyuanTown (tentative) Gas station Sensitive spot within Mandarin Posting and Interview Company 200 meters of the Chinese online sewage treatment publicity 17 plant in Xieyue Village, TianyuanTown (tentative) Xiaoga Hongfu Village Fufeng Village Villagers within 200 Mandarin Posting and Secondary n meters of the 12 48 Chinese online Water sewage treatment publicity Conservati plant in Hongfu, on District Xiaogan Town 200 meters Xingkun Sensitive spot within Mandarin Posting and Company Machinery 200 meters of the Chinese online sewage treatment publicity plant in Hongfu, Xiaogan Town Gonghe Village The Yings Yard Villagers within 200 25 100 Mandarin Posting and meters of the Chinese online sewage treatment publicity plant in Gonghe, Xiaogan Town Sihai Sensitive spot within Mandarin Posting and Company electromechanical 200 meters of the Chinese online Co. sewage treatment publicity plant in Gonghe, Xiaogan Town Lingmiao Village The Xiaos Yard Villagers within 200 35 140 Mandarin Posting and meters of the Chinese online sewage treatment publicity plant in Lingmiao, Xiaogan Town Lianhe Village Villagers and Sensitive spot within 214 700 Mandarin Posting and Small 18 businessmen of 200 meters of the Chinese online business Lianhe sewage treatment publicity plant in Lianhe, Xiaogan Town Huanghe Village Villagers of Villagers within 200 300 900 Mandarin Posting and Huanghe meters of the Chinese online sewage treatment publicity plant in Huanghe, Xiaogan Town Yangji Gaodou Village Villagers of Villagers within 200 18 72 Mandarin Posting and a Gaodou meters of the Chinese online sewage treatment publicity plant in Gaodou Village, Xiaogan Town Nanshu Village The Yangs Yard Villagers within 200 Mandarin Posting and In Water meters of the 12 48 Chinese online Conservati sewage treatment publicity on District plant in Nanshu Village, Yangjia Town Driving School Sensitive spot within Mandarin Posting and Frequent use School 200 meters of the Chinese online of legend sewage treatment publicity plant in Nanshu Village, Yangjia Town Qinghua Village the Xies Yard Villagers within 200 28 112 Mandarin Posting and meters of the Chinese online sewage treatment publicity 19 plant in Qinghua Village, Yangjia Town Pump Xinzho Downtown area Jiayi Renewable Sensitive spot within 1 5 Mandarin Posting and Interview Company Station ng Energy Recycling 50 meters of NO. 1 Chinese online Station pump station in publicity Xinzhong Town Villagers and Sensitive spot within 23 40 Mandarin Posting and Interview Small businessmen in 200 meters of NO. 2 Chinese online business downtown pump station in publicity Xinzhong Town Huang Downtown area Villagers and Villagers within 200 Mandarin Posting and Interview Small xu businessmen in meters of the 32 128 Chinese online business downtown pump station in publicity downtown area of Huangxu 20 IV. Information Release Project Stage Information to be Approaches to be Time Location Target audience Percentage of publicized taken accessibility Project feasibility Project Summary posting bulletin; Feb. 20th All administrative All the residential 95% of the affected stage: before the Stakeholder online publicizing; – Mar. village committees areas/hospitals/schools persons were notified final draft of the Participation plan written notices. 20th involved, Housing and involved under the via bulleton and written EIA outline Urban-Rural jurisdiction of notice; in writing; the Construction Bureau of administrative villages and rest via online Jingyang District, surrounding institutions publicity. Deyang City Project feasibility Environmental posting bulletin; Mar. 31st All the township All the residential 95% of the affected stage: after Social Assessment online publicizing; governments involved, areas/hospitals/schools persons were notified completion of the Report, written notices. the official websites of involved under the via bulleton and written preliminary draft Environmental the Housing and Urban- jurisdiction of notice; in writing; the of EIA document. Social Management Rural Construction administrative villages and rest via online Plan, Bureau of Jingyang surrounding institutions publicity. Environmental District, Deyang City, Social Management and the Deyang Daily. Framework, Environmental Social Commitment Plan, Stakeholder Participation Plan 21 V. Public Consultation Project Contents Methods Date Groups Villages involved Target audience Units in charge Stage (Each person for Environment assessment/Feasibility/Social assessment and three persons in one group) st Project Potential Symposium and Mar. 1 , Group 1 Longxin Bridge Village All affected the Project Office feasibility impacts on Questionnaire 2019. Songbai Village residents/hospitals/s stage: before environment (Project general chools/public Xiangyang Village the final and society information and its institutions in the draft of the of the project impacts will be presented Guoyuan Village administrative EIA outline on the symposium, and Group 2 Honghua Village villages within the relevant questions will be project area. Qingjin Village answered; questionnaire Nangui Village will be given out and requirement for filling residents' committee of will be explained as well.) Bailong Town Group 3 Qinghe Village Longdong Village Dongmei Village residents' committee of Shuangdong Town 22 Project Contents Methods Date Groups Villages involved Target audience Units in charge Stage (Each person for Environment assessment/Feasibility/Social assessment and three persons in one group) Project Potential Symposium and Mar.2nd , Group 1 Guangping Village All affected the Project Office feasibility impacts on Questionnaire 2019. Jianglin Village residents/hospitals/ stage: before environment (Project general schools/public Jinqiao Village the final draft and society of information and its institutions in the of the Social the project impacts will be Mianhe Village administrative Assessment presented on the Group 2 Sanhe Village villages outline symposium, and Shuangyuan Village relevant questions Xinlong Village will be answered; questionnaire will be Xintai Village given out and Group 3 Xinxin Village requirement for filling residents' committee of will be explained as Huangxu Town well.) Fugui Village Hongyang Village 23 Project Contents Methods Date Groups Villages involved Target audience Units in charge Stage (Each person for Environment assessment/Feasibility/Social assessment and three persons in one group) Project Potential Symposium and Mar.3rd , Group 1 Longquan Village All affected the Project Office feasibility impacts on Questionnaire 2019. Shengli Village residents/hospitals/ stage: before environment (Project general schools/public Wenquan Village the final draft and society of information and its institutions in the of the Social the project impacts will be Wuxing Village administrative Assessment presented on the Group 2 Xinyu Village villages within the outline symposium, and project area. Xinguang Village relevant questions Changjiang Village will be answered; questionnaire will be Bayi Village given out and Group 3 Changyuan Village requirement for Yuexing Village filling will be explained as well.) Gaoqiao Village Jianghe Village 24 Project Contents Methods Date Groups Villages involved Target audience Units in charge Stage (Each person for Environment assessment/Feasibility/Social assessment and three persons in one group) Project Potential Symposium and Mar.5th , Group 1 Jinji Village All affected the Project Office feasibility impacts on Questionnaire 2019. residents/hospitals/ stage: before environment (Project general Lilang Village schools/public the final draft and society of information and its Min’an Village institutions in the of the Social the project impacts will be administrative Longli Village Assessment presented on the villages within the outline symposium, and Group 2 Wuhui Village project area. relevant questions will Xiaoquan Village be answered; Yongquan Village questionnaire will be residents' committee of given out and Xiaogan Town requirement for filling will be explained as Group 3 Gonghe Village well.) Heping Village Hongfu Village Huanghe Village 25 Project Contents Methods Date Groups Villages involved Target audience Units in charge Stage (Each person for Environment th Project Potential Symposium and Mar.6 , Group 1 assessment/Feasibility/Social Lingmiao Village All affected the Project Office feasibility impacts on Questionnaire 2019. assessment and three persons residents/hospitals/ Yangliu Village in one group) stage: before environment (Project general schools/public Yinshan Road Village the final draft and society of information and its institutions in the of the Social the project impacts will be Lianhe Community administrative Assessment presented on the villages within the outline symposium, and Group 2 Fengcheng Village project area. relevant questions Gaodou Village will be answered; Nanshu Village questionnaire will be given out and Qinghua Village requirement for Group 3 Xinlong Village filling will be Yangjia Village explained as well.) residents' committee of Yangjia Town Antang Village 26 Project Stage Contents Methods Date Groups Villages involved Target audience Units in charge (Each person for Environment assessment/Feasibility/Social assessment and three persons in one group) Project Potential Symposium and Mar.7th, Group 1 Bailian Village All affected the Project Office feasibility impacts on Questionnaire 2019. Chadian Village residents/hospitals/ stage: before environment (Project general schools/public Jianshan Village the final draft and society of information and its institutions in the of the Social the project impacts will be Leijing Village administrative Assessment presented on the Group 2 Longju Village villages within the outline symposium, and project area. Gaozhi Villiage relevant questions Baijiang Village will be answered; questionnaire will be Huajing Village given out and Group 3 Wangyi Village requirement for Xieyue Village filling will be explained as well.) Diaoqiao Village Gaohuai Village VI. Complaints Mechanism On the basis of the existing complaint mechanism, the project offices of cities and counties have set up complaint mechanism on environment for the project to ensure its smooth and effective implementation. The basic channels are as follows: Phase 1: When the project stakeholders are dissatisfied with the project environment, they can make oral or written complaints to the project panel of village collectives, village committee or street/township street; Oral complaints should be handled and recorded by the project panel of village collectives, village committee or street/township street. And the village committees or streets/township streets should deal with them within one week. Phase 2: When the decision of Phase 1 is unsatisfactory, the complaint can be appealed to the project owner after the stakeholder receives the decision; the project owner should make a settlement within 2 weeks; Phase 3: When the decision of Phase 2 is still unsatisfactory, the complaint can be appealed to the Project Office of Jingyang District; the Project Office of Jingyang District should make a settlement within 2 weeks; If the stakeholders of the project are not satisfied with the existing complaint appeal procedure or the decision at any stage, the affected person may directly bring a suit to the civil court. The Project Office of Jingyang District, Deyang city and the project owner shall assign persons in charge to collect and serve complaints from people affected by the environment. In addition, on the basis of the existing complaint mechanism, the project offices of cities and counties have set up migrant complaint mechanism for the project to ensure a smooth and effective implementation of resettlement of affected residents. The basic channels are as follows: Phase 1: When the migrants are dissatisfied with the resettlement plan, they can make oral or written complaints to the project panel of village collectives, village committee or street/township street; Oral complaints should be handled and recorded by the project panel of village collectives, village committee or street/township street. And the village committees or streets/township streets should deal with them within one week. Phase 2: When the decision of Phase 1 is unsatisfactory, the migrants can appeal to the project owner after receiving the decision; the project owner should make a settlement within 2 weeks; Phase 3: When the decision of Phase 2 is still unsatisfactory, the complaint can be appealed to the Project Office of Jingyang District; the Project Office of Jingyang District should make a settlement within 2 weeks; If the migrants are not satisfied with the existing complaint appeal procedure or the decision at any stage, the affected person may directly bring a suit to the civil court. Migrants can also report to external monitoring units, and all complaints (oral or written) will be reported to the World Bank in immigration monitoring reports. Agencies will receive complaints from affected persons for free, and the reasonable costs incurred therefrom will be paid in the unforeseeable cost of the project. All appeal procedures mentioned above are effective throughout the construction of the project to ensure affected persons to use them to deal with relevant issues. The means of appeal mentioned above will be informed to migrants through the participation process of the public assembly and the release of immigration resettlement information pamphlets so they will know their complaint right. At the same time, the complaint process will be published by the media to notify affected persons. The Project Office of Jingyang District, Deyang City and the project owner shall assign persons in charge to collect and serve complaints from people affected. Appendix 1 Table 1 Public Participation Questionnaire (Individual) Name Water Environment PPP Project in Jingyang District This project is to reconstruct and newly-build facilities for water supply and drainage, and to evaluate stock assets in 11 villages and towns in Jingyang District of Deyang as well as to improve certain part of water environment in the area. Included in the project are new-built of one water supply plant and reconstruction and expansion of 39 water stations. The Project water source of the project is the people's canal; the project constructs and overview operates 31 sewage treatment stations (including 4 upgrading projects, 2 under construction projects and 25 new projects), and 4 sewage pumping stations. Final pollutant-holding water bodies are Mianyuan River, Kaijiang River and Shiting River; and the total investment of construction projects is 911.56 million yuan. Production wastewater and domestic wastewater: they are collected and treated in the sewage treatment wastewater system to meet the standards, and then, some of them are reused for farmland irrigation and some of them are discharged into pollutant-holding water bodies. Stench generated by sewage treatment structures: starting from stench units such as coarse grille, sewage Environm lifting pump house, fine grille, sand sink, MBR membrane ental processor, etc., sanitary protection distance will be set 50 Problems m outward in all directions, and all stench-producing units related Exhaust gas will be sealed and covered. It is also required that new residential buildings, hospitals, schools and other sensitive spots should not be allowed to be built within the protection distance, and no medicine, food and other enterprises should be introduced. 1. Grid slag, sediment: transported to local landfill Solid waste for disposal. 2. Waste sludge: dewatered and transported to designated sites. 3. Domestic garbage: collected and transported to environmental sanitation department for disposal. Equipment noise: selecting low noise equipment, using buildings to insulate sound, installing vibration attenuation cushion on equipment base, installing muffler noise on blowers and fans, and all kinds of pumps being set in special pump room to attenuate vibration and insulate sound. In order to give full consideration to public opinions and respect public opinions and choices in EIA, this form is hereby issued to you. Please answer carefully and fully express your opinions and suggestions. We sincerely thank you. Name gender age nationality Education officer□ College□ background worker□ Highschool□ Occupation farmer□ Middle school□ self-employed□ Primary school or none□ others□ Address Tel. Opinions on the project(tick the options you agreed) Survey contents: I. After the introduction, your understanding of the project is: □clear □limited □not clear II. You believe the impact of the project on local social and economic development is: □positive □negative □no influence III. The environmental problems you are most concerned during the construction of the project are (you may tick more than one) □noise □wastewater □exhaust gas □solid waste □ecological damage (occupied land) IV. The problems you are most concerned during the operation period of the project are (you may tick more than one) □noise □wastewater □exhaust gas □solid waste □ecological damage (occupied land) V. Pollutions you believe the construction project bringing to the environment are: □none □within a tolerant range □serious and intolerant VI. You believe the influence the construction project bringing to your work and living is □positive □none □negative but within a tolerant range □negative and intolerant VII. Do you believe the project can improve local people’s living standard? □Yes □No □No idea VIII. Do you agree with the project site selection? □Yes □No □no concerned IX. Your attitude to the project is □approval □disapproval □not concerned If you are disapproval, please give reasons; otherwise it will be deemed invalid. In addition to impacts mentioned above, what other environmental concerns do you have? What are your requirements or suggestions for the construction of the project? Table 2 Public Participation Questionnaire (group) Name Water Environment PPP Project in Jingyang District This project is to reconstruct and newly-build facilities for water supply and drainage, and to evaluate stock assets in 11 villages and towns in Jingyang District of Deyang as well as to improve certain part of water environment in the area. Included in the project are new-built of one water supply plant and reconstruction and expansion of 39 water Project stations. The water source of the project is the people's canal; the overview project constructs and operates 31 sewage treatment stations (including 4 upgrading projects, 2 under construction projects and 25 new projects), and 4 sewage pumping stations. Final pollutant-holding water bodies are Mianyuan River, Kaijiang River and Shiting River; and the total investment of construction projects is 911.56 million yuan. Production wastewater and domestic wastewater: they are collected and treated in the sewage treatment wastewater system to meet the standards, and then, some of them are reused for farmland irrigation and some of them are discharged into pollutant-holding water bodies. Stench generated by sewage treatment structures: Starting from stench units such as coarse grille, sewage Environm lifting pump house, fine grille, sand sink, MBR ental membrane processor, etc., sanitary protection distance Problems will be set 50 m outward in all directions, and all related Exhaust gas stench-producing units will be sealed and covered. It is also required that new residential buildings, hospitals, schools and other sensitive spots should not be allowed to be built within the protection distance, and no medicine, food and other enterprises should be introduced. Solid waste 1. Grid slag, sediment: transported to local landfill for disposal. 2. Waste sludge: dewatered and transported to designated sites. 3. Domestic garbage: collected and transported to environmental sanitation department for disposal. Equipment noise: selecting low noise equipment, using buildings to insulate sound, installing vibration attenuation cushion on equipment base, installing noise muffler on fan, and all kinds of pumps being setting in special pump room to attenuate vibration and insulate sound. In order to give full consideration to public opinions and respect public opinions and choices in EIA, this form is hereby issued to your unit. Please answer carefully and fully express your unit’s opinions and suggestions. We sincerely thank you. Population of the Unit Name unit Government office□ Public institution□ Company□ Unit Type social organization□ Unit address Contact Tel. Opinions on the project(tick the options you agreed) Survey contents: I. After the introduction, your understanding of the project is: □clear □limited □not clear II. You believe the impact of the project on local social and economic development is: □positive □negative □no influence III. The environmental problems you are most concerned during the construction of the project are (you may tick more than one) □noise □wastewater □exhaust gas □solid waste □ecological damage (occupied land) IV. The problems you are most concerned during the operation period of the project are (you may tick more than one) □noise □wastewater □exhaust gas □solid waste □ecological damage (occupied land) V. Pollutions you believe the construction project bringing to the environment are: □none □within a tolerant range □serious and intolerant VI. You believe the influence the construction project bringing to your work and living is □positive □none □negative but within a tolerant range □negative and intolerant VII. Do you believe the project can improve local people’s living standard? □Yes □No □No idea VIII. Do you agree with the project site selection? □Yes □No □no concerned IX. Your attitude to the project is □approval □disapproval □not concerned If you are disapproval, please give reasons; otherwise it will be deemed invalid. What are your requirements or suggestions for the construction of the project?