Small Hydro Resource Mapping in Indonesia SMALL HYDROPOWER POTENTIAL REPORT March 2017 This report was prepared by GESTO, AQUALOGUS and INDONESIA HYDRO CONSULT, under contract to The World Bank. This is a final output from the nergy Resource Mapping and Geospatial Planning [Project ID: P145273]. This activity is funded and supported by the Energy Sector Management Assistance Program (ESMAP), a multi-donor trust fund administered by The World Bank, under a global initiative on Renewable Energy Resource Mapping. Further details on the initiative can be obtained from the ESMAP website. This final document presents the hydropower potential in the regions of NTT, Maluku, Maluku Utara and Sulawesi for both the grid expansion and isolated systems and complements the GIS Database output. This output has been internally peer-reviewed and i listed on the ESMAP website along with the other project outputs - please refer to the corresponding country page. Copyright © 2017 THE WORLD BANK Washington DC 20433 Telephone: +1-202-473-1000 Internet: www.worldbank.org The World Bank, comprising the International Bank for Reconstruction and Development (IBRD) and the International Development Association (IDA), is the commissioning agent and copyright holder for this publication. However, this work is a product of the consultants listed, and not of World Bank staff. The findings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, its Board of Executive Directors, or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work and accept no responsibility for any consequence of their use. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. The material in this work is subject to copyright. Because The World Bank encourages dissemination of its knowledge, this work may be reproduced, in whole or in part, for non-commercial purposes as long as full attribution to this work is given. Any queries on rights and licenses, including subsidiary rights, should be addressed to World Bank Publications, The World Bank Group, 1818 H Street NW, Washington, DC 20433, USA; fax: +1-202-522-2625; e-mail: pubrights@worldbank.org. Furthermore, the ESMAP Program Manager would appreciate receiving a copy of the publication that uses this publication for its source sent in care of the address above, or to esmap@worldbank.org. SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT March 2017 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT TABLE OF CONTENTS 1 INTRODUCTION ............................................................................................................................................................... 1 1.1 SYNOPSIS.............................................................................................................................................................................1 1.2 ESMAP ..............................................................................................................................................................................1 1.3 THE CONSULTANT .................................................................................................................................................................2 1.4 OBJECTIVES ..........................................................................................................................................................................4 1.5 METHODOLOGY ....................................................................................................................................................................5 1.6 CONTENT OF THE REPORT .......................................................................................................................................................6 2 EXISTING POWER GENERATION AND DISTRIBUTION SITUATION..................................................................................... 8 2.1 CONTEXT .............................................................................................................................................................................8 2.2 INDONESIA ...........................................................................................................................................................................8 2.2.1 Current situation .....................................................................................................................................................8 2.2.2 Development plans ...............................................................................................................................................12 2.3 SULAWESI ..........................................................................................................................................................................16 2.3.1 Current situation ...................................................................................................................................................16 2.3.2 Development Plans ...............................................................................................................................................18 2.4 MALUKU & MALUKU UTARA.................................................................................................................................................20 2.4.1 Current situation ...................................................................................................................................................20 2.4.2 Development Plans ...............................................................................................................................................22 2.5 NTT .................................................................................................................................................................................26 2.5.1 Current situation ...................................................................................................................................................26 2.5.2 Development Plans ...............................................................................................................................................28 3 SMALL HYDROPOWER ROLE .......................................................................................................................................... 31 3.1 CONTEXT ...........................................................................................................................................................................31 3.2 REVIEW OF THE CURRENT LEGAL FRAMEWORK ..........................................................................................................................31 3.2.1 Electricity sector....................................................................................................................................................31 3.2.2 Other required licenses .........................................................................................................................................35 3.2.3 Environmental Administration ..............................................................................................................................36 3.2.4 Forestry Administration ........................................................................................................................................39 3.3 STRENGTHS AND WEAKNESSES OF USING SMALL HYDROPOWER IN ISOLATED SYSTEMS .....................................................................40 3.3.1 Context..................................................................................................................................................................40 3.3.2 Strengths...............................................................................................................................................................41 3.3.3 Weakenesses ........................................................................................................................................................42 3.4 POSSIBLE SOLUTIONS TO IDENTIFIED CHALLENGES .....................................................................................................................43 4 UPDATED LIST OF ALREADY IDENTIFIED POTENTIAL FOR SMALL HYDROPOWER ........................................................... 46 4.1 CONTEXT ...........................................................................................................................................................................46 4.2 LIST OF PROJECTS FROM THE NATIONAL MAP ...........................................................................................................................46 4.3 SITE VISITS TO MAJOR WILAYAHS...........................................................................................................................................53 4.4 RESULTS ............................................................................................................................................................................55 5 REVIEW AND PRIORITIZATION OF SMALL HYDROPOWER POTENTIAL ........................................................................... 56 5.1 CONTEXT ...........................................................................................................................................................................56 i ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 5.2 ANALYSIS OF EXISTING DATA .................................................................................................................................................56 5.3 DEMAND ...........................................................................................................................................................................59 5.4 METHODOLOGY ..................................................................................................................................................................60 5.4.1 Review Process......................................................................................................................................................60 5.4.2 Screening Stage ....................................................................................................................................................62 5.4.3 Analysis Stage .......................................................................................................................................................65 5.4.4 Prioritization Stage ...............................................................................................................................................90 5.5 ANALYSIS OF ISOLATED GRID SYSTEMS ....................................................................................................................................95 5.6 RECOMMENDATIONS FOR FURTHER DEVELOPMENTS..................................................................................................................99 5.7 UPDATE OF THE NATIONAL GIS DATABASE...............................................................................................................................99 6 CONTRIBUTIONS TO THE GEOSPATIAL ELECTRIFICATION PLANNING TOOL ................................................................. 100 7 CONCLUSIONS ............................................................................................................................................................. 101 REFERENCES ......................................................................................................................................................................... 103 FIGURES Figure 1.1 – Objectives of the project Small Hydropower Mapping in Indonesia and Improved Geospatial Planning. .........................................................................................................................................................................................4 Figure 1.2 – Workflow with the technical approach and methodology from the Consultant........................................................6 Figure 2.1 – Development plan of the transmission system in Sumatera. [5] .............................................................................10 Figure 2.2 – Total generating capacity per type of power plant in 2014. [4] ...............................................................................10 Figure 2.3 – Electricity consumption per type of customer. [4], [6], [7] ......................................................................................11 Figure 2.4 – Regional demand growth between 2015 and 2024. [3] ...........................................................................................13 Figure 2.5 – Regional demand growth between 2015 and 2024 per type of customer (TWh). [3] .............................................13 Figure 2.6 – Additional installed capacity per type of owner and operator. [3] ..........................................................................14 Figure 2.7 – Additional installed capacity per type of technology. [3] .........................................................................................15 Figure 2.8 – Development plan for New and Renewable Energy 2015-2024. [3] ........................................................................15 Figure 2.9 – Installed capacity in Sulawesi per province in 2014. [4] ...........................................................................................17 Figure 2.10 – Installed capacity in Sulawesi in 2014. [4] ..............................................................................................................17 Figure 2.11 – Development plans in Sulawesi between 2016 and 2025. [5] ................................................................................20 Figure 2.12 – Installed capacity in Maluku and Maluku Utara in 2014. [4] ..................................................................................21 Figure 2.13 – Power generation development plant in Maluku between 2016 and 2025 (RUPTL). ............................................23 Figure 2.14 – Development plans in Ambon and Seram between 2016 and 2025. [5] ................................................................24 Figure 2.15 – Development plans in Buru between 2016 and 2025. [5] ......................................................................................24 Figure 2.16 – Power generation development plant in Maluku Utara between 2016 and 2025. [5] ..........................................25 Figure 2.17 – Development plans in Halmahera between 2016 and 2025. [5] ............................................................................26 Figure 2.18 – Installed capacity in NTT in 2014 (MW). [4]............................................................................................................27 ii ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 2.19 – Power generation development plant in NTT between 2016 and 2025. [5] ..........................................................28 Figure 2.20 – Development plans in Flores between 2016 and 2025. [5] ....................................................................................29 Figure 2.21 – Development plans in Timor between 2016 and 2025. [5] ....................................................................................30 Figure 2.22 – Development plans in Sumba between 2016 and 2025. [5] ...................................................................................30 Figure 3.1 – Flowchart for direct appointment method for SHP. .................................................................................................33 Figure 3.2 – Scheme of the AMDAL procedures. ..........................................................................................................................38 Figure 4.1 – Distribution of hydropower projects per Island and Wilayah. .................................................................................47 Figure 4.2 – Distribution of Large (LHP) and Small (SHP) hydro per Island and Wilayah. ............................................................49 Figure 4.3 – Distribution of SHP per Island and Wilayah. .............................................................................................................50 Figure 4.4 – Total capacity (MW) per Island and identified developer. .......................................................................................52 Figure 4.5 – Site visits in: a) Minraleng-2 project site, Sulawesi Selatan; b) PLTM Tincep 2 project site, Sulawesi Utara; c) Halo project site, Ambon, Maluku; and d) PLTMH Oehala micro-hydro project, Kupang, Timur. ................................54 Figure 5.1 – Hydropower capacity per region. List of identified potential. .................................................................................57 Figure 5.2 – Installed capacity (<10 MW) vs. investment cost in the list of identified potential. ................................................58 Figure 5.3 - Proposed workflow of SHP prioritizing process. .......................................................................................................61 Figure 5.4 - Final Workflow of SHP prioritizing process. ..............................................................................................................62 Figure 5.5 - Workflow for the screening stage. ............................................................................................................................62 Figure 5.6 – Hydropower capacity per region. Final screening phase. ........................................................................................65 Figure 5.7 - Workflow for the analysis stage. ...............................................................................................................................66 Figure 5.8 – Run-of-river plant example [21]. ..............................................................................................................................67 Figure 5.9 – Hydropower plant with reservoir example [21]. ......................................................................................................67 Figure 5.10 – Flow duration curve example. ................................................................................................................................71 Figure 5.11 – Turbine selection chart. ..........................................................................................................................................77 Figure 5.12 – Specific speed chart. ...............................................................................................................................................77 Figure 5.13 – Cost curve for penstock unit cost. ..........................................................................................................................80 Figure 5.14 – Investment cost vs installed capacity for NTT region. ............................................................................................82 Figure 5.15 – Distribution of LCOE for NTT region. ......................................................................................................................82 Figure 5.16 – Distribution of IRR for NTT region. .........................................................................................................................83 Figure 5.17 – Investment cost vs installed capacity for Maluku region. ......................................................................................83 Figure 5.18 – Distribution of LCOE for Maluku region. .................................................................................................................84 Figure 5.19 – Distribution of IRR for Maluku region. ....................................................................................................................84 Figure 5.20 – Investment cost vs installed capacity for Maluku Utara region. ............................................................................85 Figure 5.21 – Distribution of LCOE for Maluku Utara region. .......................................................................................................85 iii ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 5.22 – Distribution of IRR for Maluku Utara region. ..........................................................................................................86 Figure 5.23 – Investment cost vs installed capacity Sulawesi region. ..........................................................................................86 Figure 5.24 – Distribution of LCOE for Sulawesi region. ...............................................................................................................87 Figure 5.25 – Distribution of IRR for Sulawesi region. ..................................................................................................................88 Figure 5.26 – Investment cost vs installed capacity in all the regions. .........................................................................................88 Figure 5.27 – Distribution of LCOE in all the regions. ...................................................................................................................89 Figure 5.28 – Distribution of IRR in all the regions. ......................................................................................................................89 Figure 5.29 - Workflow for the prioritization stage. .....................................................................................................................90 Figure 5.30 – Installed capacity classification. ..............................................................................................................................91 Figure 5.31 – LCOE classification. .................................................................................................................................................92 Figure 5.32 – Local electrification demand analysis example. .....................................................................................................93 Figure 5.33 – Local electrification demand classification. ............................................................................................................93 Figure 5.34 – Isolated grid SHP potential site example. ...............................................................................................................96 TABLES Table 2.1 – Electricity statistics between 2009 and 2014. [4], [6], [7], [8], [9] .............................................................................12 Table 2.2 – PLN and IPP investment between 2015 and 2024 (USD million). [3] .........................................................................16 Table 2.3 – Electricity statistics in Sulawesi per province in 2014. [4] .........................................................................................18 Table 2.4 – Electricity statistics in Maluku and Maluku Utara in 2014. [4] ..................................................................................22 Table 2.5 – Electricity statistics in NTT in 2014. [4] ......................................................................................................................28 Table 3.1 - Feed-in tariff levels. ....................................................................................................................................................34 Table 3.2 – Other required licenses. .............................................................................................................................................35 Table 3.3 - Electricity and energy utilization activities needed to conduct an AMDAL. ...............................................................37 Table 3.4 – Utilization of forest areas by development activities beside forestry production, P.16/Menhut- II/2014. .........................................................................................................................................................................................40 Table 4.1 – Distribution of the hydropower projects per Island and Wilayah. ............................................................................47 Table 4.2 – Distribution of SHP per Island and Wilayah. ..............................................................................................................50 Table 4.3 – Indonesian SHP status. ...............................................................................................................................................51 Table 4.4 – Indonesian SHP developer’s categories. ....................................................................................................................51 Table 4.5 – Identified new SHP potential from PLN Wilayahs. .....................................................................................................53 Table 4.6 – Identified SHP potential on the study area. ...............................................................................................................55 Table 5.1 – Hydropower capacity per region. List of identified potential. ...................................................................................56 Table 5.2 – Province Statistics. [4] [20] ........................................................................................................................................59 iv ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Table 5.3 – Province load demand forecast. [5] ...........................................................................................................................60 Table 5.4 – Number of excluded projects in Phase 1 by region. ..................................................................................................63 Table 5.5 – Number of excluded project in Phase 2 by region. ....................................................................................................63 Table 5.6 – Number of excluded project in Phase 3 by region. ....................................................................................................64 Table 5.7 – Number of excluded projects in Phase 4 by region. ..................................................................................................64 Table 5.8 – Hydropower capacity per region. Final screening phase. ..........................................................................................65 Table 5.9 – Number of projects considered for the list of most promising sites per region. .......................................................70 Table 5.10 – Protected and environmentally sensitive areas classification. ................................................................................92 Table 5.11 – Potential isolated grid SHP sites (with 30 km or greater distance to grid). .............................................................96 Table 5.12 – Isolated grid SHP potential sites. Annual Energy Demand meets Annual Production. ...........................................97 Table 5.13 – Isolated grid SHP potential sites. Annual Energy Demand meets Annual Production. ...........................................98 Table 5.14 – Most promising isolated grid SHP potential sites. ...................................................................................................98 ANNEXES Annex I – Updated list of identified potential in NTT, Maluku, Maluku Utara and Sulawesi Annex II – Demand forecast results Annex III – Results of the preliminary site assessment Annex IV – Multi-criteria results Annex V – List of most promising sites - Base strategy Annex VI – List of most promising sites - Hydropower development strategy Annex VII – List of most promising sites - Environmental impact strategy Annex VIII – List of most promising sites – Rural Electrification strategy Annex IX –Results for the Isolated Grid Systems v ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT GLOSSARY OF ABBREVIATIONS AND ACRONYMS ADB Asian Development Bank AMDAL Analisis Mengenai Dampak Lingkungan (Environmental Impact Assessment) ANDAL Analisis Dampak Lingkungan Hidup (Environmental Impact Analysis) BKPM Badan Koordinasi Penanaman Modal (Indonesian Investment Coordinating Board) BPS Badan Pusat Statistik (Statistics Indonesia) CSP Concentrated Solar Power DivEBT Divisi Energi Baru Dan Terbarukan (New And Renewable Energy Division) EBT Energi Baru Dan Terbarukan (New And Renewable Energy) EDTL Electricidade De Timor Leste EHV Extra High Voltage ESMAP The Energy Sector Management Assistance Program FiT Feed-in-tariff GDP Gross domestic product GEP Geospatial Electrification Planning GIS Geographic Information System HV High Voltage IHC Indonesia Hydro Consult IMB Izin Mendirikan Bangunan (Building Construction Permit) IPP Independent Power Producer IRENA The International Renewable Energy Agency IUPTL Izin Usaha Penyediaan Tenaga Listrik (Electricity Business Permit) KA-ANDAL Kerangka Acuan Analisis Dampak Lingkungan Hidup (Environmental Management Plan) KEN Kebijakan Energi Nasional (National Energy Policy) KPPT Kantor Pelayanan Perizinan Terpadu (Integrated Licensing Services Office) LCOE Levelized Cost Of Electricity LHP Large Hydropower Project LV Low Voltage MEMR Kementarian Energi Dan Sumber Daya Mineral (Ministry of Energy and Mineral Resources) NTB Nusa Tenggara Barat NTT Nusa Tenggara Timur PEN Pengelolaan Energi Nasional (Blueprint Of National Energy Management) PLN Perusahaan Listrik Negara (State Electricity Company) PPA Power Purchase Agreement PTSP Pelayanan Terpadu Satu Pintu (One-Stop Integrated Services) RE Renewable Energy RKL Rencana Pengelolaan Lingkungan Hidup (Environmental Management Plan) RPL Rencana Pemantauan Lingkungan Hidup (Environmental Monitoring Plan) RUKD Rencana Umum Ketenagalistrikan Daerah (Regional General Plan Of Electricity) RUKN Rencana Umum Ketenagalistrikan Nasional (Electricity Master plan) RUPTL Rencana Usaha Penyediaan Tenaga Listrik (Electrification Development Program) vi ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT SHP Small Hydropower Project ToR Terms of Reference UKL Upaya Pengelolaan Lingkungan Hidup (Environmental Management Efforts) UPL Upaya Pemantauan Lingkungan Hidup (Environment Monitoring Efforts) USAID United States Agency For International Development WB World Bank vii ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 1 INTRODUCTION 1.1 SYNOPSIS The Small Hydropower Mapping and Improved Geospatial Electrification Planning in Indonesia project (Selection No. 1125330) is an initiative administered by the Energy Sector Management Assistance Program (ESMAP), which objective is to facilitate and improve the planning and investment process for small hydropower development in both grid and isolated systems through: a) Building up a central database on small hydropower at national scale and validating the mapping of small hydropower in NTT, Maluku, Maluku Utara and Sulawesi; b) Improved electrification planning by integrating small hydropower potential for the provinces of NTT, Maluku, Maluku Utara and Sulawesi into the planning process. The current document represents the Small Hydropower Potential in NTT, Maluku, Maluku Utara and Sulawesi Report that aims to present the hydropower potential in those regions for both grid expansion and isolated systems and to present a list of small hydropower sites for development, including recommendations for additional supporting studies, investigation and monitoring. It is complemented by two other documents: the GIS Database User’s Manual and the Small Hydropower Mapping Report. The next sub-sections further explain the background, objectives and content of the document. 1.2 ESMAP ESMAP is a global knowledge and technical assistance program administered by The World Bank and supported by 11 bilateral donors. ESMAP’s efforts focus on energy security, energy access, and climate change, and involve three core services: i) analytical work, ii) knowledge clearinghouse, and iii) operational support to The World Bank regions for technical assistance work at the country level. Carrying out RE resource mapping and geospatial analysis at the country level helps to scale up the deployment of biomass, small hydro, solar and wind electricity generation, particularly in countries where one or more of these sources of power are underdeveloped. This is because such mapping is a crucial step to developing a policy framework to guide investment in RE electricity generation which, along with publicly-available data, helps reduce transaction costs and speeds up deployment by providing commercial developers with:  Increased certainty that projects are likely to be approved or permitted with minimal bureaucracy and delay;  Data transparency and a level playing field, thereby reducing barriers to the entry and limiting the scope of corruption;  A baseline of reliable data that can help guide prospecting activities and can be used for data verification purposes; 1 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT  A better informed off-taker or purchasing authority, thereby improving the price negotiation process. In response, ESMAP has launched a new initiative to support country-driven efforts to improve RE resource awareness, put in place appropriate policy frameworks for RE development, and provide “open access” to resource and geospatial mapping data. One of the key elements of this ESMAP initiative was to select consulting firms and establish framework agreements for the procurement of resource data and mapping services. On the scope of “Small Hydropower Resource Data and Mapping Service”, the Consultant Consortium headed by Gesto Energy Consulting (GESTO), also including Aqualogus, Engenharia e Ambiente (AQUALOGUS) and GAF AG was successfully selected for the framework agreement with The World Bank. The current project “Small Hydropower Mapping and Improved Geospatial Planning” is under the scope of the framework agreement with The World Bank. For the renewable energy mapping based on hydropower, The World Bank hired qualified consulting firms with demonstrated capabilities in providing small hydropower resource mapping and related services. The Indefinite Delivery Contract commenced on May 28, 2013, and is expected to end by 2017. The tender for Small Hydropower Mapping and Improved Electrification Planning in Indonesia was released under this contract in late 2013. For this particular tender, the Consultant’s Association (CONSULTANT) is led by GESTO, and includes AQUALOGUS and Indonesia Hydro Consult, as a local partner. After the tenders’ evaluation in early 2014, the World Bank informed the Consultant that it was chosen to perform the Project. After a period of negotiation the Contract was signed on February 12 2014. The project was built on previous efforts for the assessment of renewable energy potential and electrification funded by The World Bank (ASTAE-AusAID-ESMAP), ADB, AusAid, Norwegian Government, USAID and others. The resource mapping activity is part of a broader World Bank program of technical assistance that will assist in the implementation of the 1,000 Island Electrification Program via scaling up renewable energy, resource mapping, geospatial planning and capacity building of key stakeholders in each of the above areas. 1.3 THE CONSULTANT GESTO, the leading partner, is an international consultant specialized in energy and in the evaluation of renewable resources. GESTO has know-how and experience in the development of renewable energy policy as well as master plans and supports all phases of renewable energy project development. With a wide scope of expertise, including but not limited to, hydro resource study and evaluation, project analysis and prioritization, and support for projects development, GESTO track record includes, not only, resource mapping - more than 15 resource maps in the last 4 years – but also, the 2 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT development of Hydro Atlas and projects identification for Cape Verde, East Timor, Mozambique and Angola, and a 5 MW Solar plant development in Cape Verde (Santiago Island) - the largest built in Africa at that time. Currently, GESTO presents a worldwide portfolio of concluded and on-going projects: Renewable Energy Roadmap to 2020 (Cape Verde), Concentrated Solar Power (CSP) Plant Pre-Feasibility Study (Namibia), Mozambique Renewable Energy Atlas, Angola Energy Vision to 2025, Renewable Electrification Plan of East Timor and Project Development for Renewable Auctions in South Africa. AQUALOGUS’ core business is dedicated consultancy and engineering design services in water and environmental projects. The company has 16 years’ experience in hydropower projects evaluation, feasibility assessment and design. It has recently developed/participated a number of studies and designs of hydropower schemes, dams and environmental assessments, worth highlighting the evaluation of the small hydropower potential (<10 MW) potential for the Portuguese territory and the Tagus hydrologic region hydropower potential mapping and location, as well as the following related projects:  Medium and small hydropower plants: more than 30 studies and designs in the last 10 years, with installed power ranging from 500 kW to 30 MW, in Portugal, Mozambique, Cape Verde and Brazil.  Large dam designs: several embankment and concrete structures for hydro agricultural schemes (mostly in the large multipurpose Alqueva project), hydropower and water supply (detailed design in the last 5 years of Fridão 35 m gravity dam, Daivões 75 m gravity dam, Odelouca 76 m earth dam).  Environmental impact assessment studies of hydropower plants (more than 15 in the last 10 years) and of hydraulic schemes (more than 20 000 ha of irrigation projects). Indonesia Hydro Consult (IHC) is one of the fastest growing hydro engineering consulting service companies in Indonesia. They are leading providers of hydro project solutions and provide high quality on-site and remote consulting services for growing hydro developers nationwide and give them a significant development benefit. Their objective is to enhance the success of their clients by providing solutions for projects and cost-effective consulting services for their business needs. IHC has expertise in the field of hydro engineering nationwide in Indonesia. The experience gained from site reconnaissance, planning and studies, design and design reviews, and construction assistances have made them capable to offer comprehensive consultancy services. Their benefits from the previous projects enable them to offer improvement at every step of the project. Their experience and resources enable innovative development to assemble project teams quickly, based on the technical requirements of each project. 3 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 1.4 OBJECTIVES After the 2013 Scoping Mission by the ESMAP team in Jakarta it was concluded that small hydropower can play a role in clean power generation in Indonesia, and that there was interest from both public and private investors to develop small hydropower, but that there lacked promotion and coordinated planning of small hydropower development. Hence, the ESMAP current contribution for small hydropower in Indonesia (Small Hydropower Mapping and Improved Geospatial Planning in Indonesia) has an overall objective to mainstream small hydropower into the planning process for generation growth and electrification planning in Indonesia. More precisely, the consultancy services have the specific purpose to facilitate and improve the planning process of small hydropower in both grid and isolated systems through establishment of GIS-based databases, which will help PLN to optimize development and avoid conflicts with long-term maximized utilization of the resource and to promote and facilitate the role of small hydropower in remote areas and in isolated grid systems, where the need is to go from planning small hydropower based on maximized capacity and least cost of energy, to customizing schemes to demand to get the highest benefit of substituting fossil fuel generating plants. The objectives of the project are schematically presented in Figure 1.1. Facilitate and Improve the planning Integrate small process hydropower Avoid conflicts potential in the with long term improved maximized electrification utilization of the (NTT, Maluku, Mainstream resource Maluku Utara small and Sulawesi) hydropower into the planning process for generation and Promote and Building up a facilitate de role central electrification of small database on hydropower in small hydro remote areas Customizing (National Level) and isolated schemes (stand grid systems alone or hybrid) to demand to get the highest benefit of substituting diesel Figure 1.1 – Objectives of the project Small Hydropower Mapping in Indonesia and Improved Geospatial Planning. 4 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Moreover, the consultancy services will be done in parallel on two vectors following PLN’s interest:  Building up a central database on small hydropower at a national scale to be housed in PLN’s central office in Jakarta;  Improved electrification planning by integrating small hydropower potential for the provinces of NTT, Maluku, Maluku Utara, and Sulawesi in eastern Indonesia. The two components will be linked through developing the national database on small hydropower in such a way that it can feed input to the geospatial electrification planning tool, which is aimed to be implemented for the entire country in the long-term. 1.5 METHODOLOGY The Terms of Reference requested the work to be grouped in two main activities:  Activity 1 – Data collection and production of a national small hydropower GIS database, review and validation of small hydropower potential for NTT, Maluku, Maluku Utara and Sulawesi;  Activity 2 – Support to the inclusion of small hydropower potential to the geospatial electrification planning for NTT, Maluku, Maluku Utara and Sulawesi. As an optional activity, a training component was requested and contracted within the scope of the project. The training activity aims to provide PLN the required skills to host, operate and further develop the National Database, as well as to perform the required analysis to prioritize the Small Hydropower Projects (SHP) in the region, according to the established multi-criteria analysis. The objectives of Activity 1 are:  To carry out an inception phase and draw an inception report  To create a GIS database for national information on SHP development  To create the list of the most promising SHP sites in NTT, Maluku, Maluku Utara and Sulawesi  To produce the SHP Mapping Report and promote a workshop for results presentation to client and relevant stakeholders The objectives of Activity 2 are:  To create a list of potential SHP sites in NTT, Maluku, Maluku Utara and Sulawesi to be incorporated in the Geospatial Electrification Planning (GEP) Tool  To draw policy recommendations on the development of SHP in Indonesia  To produce the Final Report and promote the Final Workshop for the Client and relevant stakeholders For the development of these activities, the Consultant’s methodology is best described in the workflow of interconnected sub-activities and tasks presented in Figure 1.2. 5 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 1.2 – Workflow with the technical approach and methodology from the Consultant. 1.6 CONTENT OF THE REPORT Chapter 1 of the report is the project’s introduction. Chapter 2 addresses the existing power generation and distribution situation in Indonesia, with an especial focus on the study area of NTT, Maluku, Maluku Utara and Sulawesi. Building on the assessment described on the previous chapter, a review of the SHP role in Indonesia is presented in Chapter 3, including the assessment of the current legal framework and of the expected strengths and weakness of using SHP in isolated grid systems. The update of the list of already identified potential for SHP on the study area of NTT, Maluku, Maluku Utara and Sulawesi is conducted in Chapter 4, based on the data collated for the nationwide database complemented with the results of the site visits to the major regional offices. Based on the previous updated list of already identified potential for SHP on the study area of NTT, Maluku, Maluku Utara and Sulawesi, a review and prioritization of the SHP potential in the same study 6 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT area is described in detail in Chapter 5, where the resulting list of the most promising sites is also presented. It is also addressed in detail in Chapter 5 the SHP ranking process for isolated grid systems and future recommendations for further development studies. Chapter 6 addresses the coordination and inputs to the parallel contract on the Geospatial Planning Tool, and, finally, Chapter 7 presents the report’s conclusions. 7 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 2 EXISTING POWER GENERATION AND DISTRIBUTION SITUATION 2.1 CONTEXT Although one of the ideas of ESMAP’s SHP mapping is ground-based monitoring of hydrology and geotechnical site investigations, these were originally considered too difficult to conduct in Indonesia within the time frame and budget of the project because of the geographic characteristics of the territory, with a large number of islands and generally very steep terrain. Instead, ESMAP proposed the focus of the validation process in Activity 1 to be on customizing the mapping of SHP to the unique characteristics of the power grid in Indonesia, which is a result of the same difficult geographical characteristics. It is accepted that populated remote areas are very costly to link to the main grid and that the traditional mapping of hydro potential based on larger schemes connected to HV lines may not always be the best alternatives. This chapter presents an overall review of the existing power generation and distribution situation in Indonesia in general, and in NTT, Maluku, Maluku Utara, and Sulawesi in particular. It serves as an introduction to the assessment presented in the next chapter, where SHP’s role as a generation option is addressed. 2.2 INDONESIA 2.2.1 CURRENT SITUATION Indonesia is estimated to have the world’s 16th largest GDP in 2016, having maintained a growing economy even in face of a global economic slowdown. Indonesia’s economic growth is dependent on the country’s ability to secure access to reliable and cost-effective energy sources, given that the energy demand has been growing steadily in the past few years. [1] Furthermore, its vast territory, comprised of 17 508 islands, is home for over 250 million people, making Indonesia the fourth most populated country in the world, only behind China, India and the United States of America. More than half of the country’s population lives in the Ja wa-Bali region, the region where Indonesia’s economic activity is mostly focused. The rest of the population is spread out across Sumatera, Kalimantan, Sulawesi, Nusa Tenggara, Maluku and Papua. This island geography makes transportation and service provision, such as providing electricity and energy services nationwide, a challenge needed to be overcome. [2] Given the aforementioned, some remote populated areas become very costly to connect to the existing grid. In such areas, electricity is supplied through isolated grid systems, that are based mainly on LV and MV lines and that need independent power generation sources. On the other hand, in large electricity systems, such as Sumatera, Jawa-Bali and Sulawesi, there are already extra high voltage (EHV) 8 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT transmission lines, that form the backbone of the electricity systems. Moreover, a connection between the Jawa-Bali and the Sumatera systems is also planned, as depicted in Figure 2.1. Taking Sumatera’s grid as an example, it is important to highlight that one of the advantages of connecting a system to the grid is that this allows the transmission of electricity from power plants with cheap energy sources to regions lacking those types of source, and which were consequently using more expensive ones, such as diesel-fueled power plants. [3], [4] The Indonesian electricity distribution service is monopolized by PLN, which is the sole supplier of electricity to the public and business. Although some private electricity companies are operating, they are only allowed to sell the electricity produced to the public through the power system owned by PLN. Additionally, PLN is the entity responsible for achieving the government’s generation targets, but the generation capacity is distributed between PLN and independent power producers (IPP), with PLN having the right of first refusal over every activity in the electricity sector. At the end of 2014, PLN owned and operated units totaling 37.4 GW of installed capacity, representing a 3.99% increase from the previous year. Including IPPs’ power plants, the total generation capacity of the country was 53.1 GW. The total generating capacity per type of power plant is pictured in Figure 2.2, with a predominance of steam-based generation, which accounted for more than 47%, having hydropower plants accounted for 9.9% of the total installed capacity. In the same pictures, “Others” generation accounts for solar, wind, coal gasification and waste power plants, totaling 0.1% of the national installed capacity. [3], [4] 9 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 2.1 – Development plan of the transmission system in Sumatera. [5] 2.6% 0.1% 9.3% Steam Turbine 9.9% Combined Cycle Diesel 47.3% Hydro 11.7% Gas Geothermal Others 19.1% Figure 2.2 – Total generating capacity per type of power plant in 2014. [4] 10 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Considering the electricity sold by PLN, it is possible to see a steady increase: while in 2009 the electricity sold amounted to 133.1 TWh, in 2014 this value was 198.6 TWh. This growth is also related to the increase in the number of customers, from 39.8 million to 57.5 million, and in the electrification ratio, from 63.5% to 84.4%, between 2009 and 2014. It was also observed that the major share of electricity sold was to residential consumers, followed by industrial and commercial ones, and finally by the “Others” group (social/government office buildings and public street lighting). The evolution of electricity consumption between 2012 and 2014 for each type of consumer is displayed in Figure 2.3 below. [3] Electricity consumption (GWh) 90 000 84 086 77 211 75 000 72 133 65 909 64 381 60 175 60 000 45 000 36 282 34 498 34 045 30 000 12 324 15 000 11 451 10 694 0 Others Commercial Industry Residential 2012 2013 2014 Figure 2.3 – Electricity consumption per type of customer. [4], [6], [7] Along with the investment in energy generation facilities, in order to strengthen the electricity systems and to provide electricity to non-electrified regions, investment in transmission and distribution lines is needed. The development of the transmission is focused on strengthening the existing grid, as well as interconnecting islands and establishing connections with neighboring countries when such investments are feasible. On the other hand, distribution investment is focused on the improvement of electricity supply quality, on the reduction of distribution losses and on the replacement of aged distribution lines. The deterioration of the existent distribution network, due to the lack of maintenance, has caused overloading and unreliability in energy supply in certain regions. A compilation of several important characteristics of Indonesia’s electricity grid is tabled in Table 2.1 below, which includes the total installed capacity in the country, the peak load, the transmission and distribution network lengths, the amount of energy sold to customers, the number of customers and the electrification ratio (number of households with electricity to total number of households ratio), between 2009 and 2014. 11 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Table 2.1 – Electricity statistics between 2009 and 2014. [4], [6], [7], [8], [9] 2009 2010 2011 2012 2013 2014 Installed capacity (MW) 30 915 33 983 39 899 45 253 50 990 53 066 PLN (MW) 25 466 26 895 30 529 33 221 35 947 37 380 IPPs (MW) 5 449 7 088 9 370 12 032 15 043 15 686 Peak Load (MW) 23 436 24 914 - 28 882 30 834 - Transmission lines (km) 40 041 41 712 - 38 096 39 395 40 332 EHV (km) 5 092 5 052 - 5 052 5 053 5 053 HV (km) 34 949 36 719 - 33 044 34 342 35 278 Distribution lines (km) 639 517 681 762 - 741 956 798 944 925 312 MV (km) 268 611 288 719 - 313 049 329 465 339 558 LV (km) 370 905 390 704 - 428 907 469 479 585 754 Energy sales (GWh) 13 451 834 147 297 157 992 173 987 187 541 198 602 Number of customers 40 033 384 42 435 387 45 895 145 49 793 626 53 996 208 57 493 234 Electrification ratio 66.3% 67.2% 73.0% 76.9% 80.5% 84.4% Analyzing the previously presented table, it is possible to see a clear growth in Indonesia’s electricity sector. All the tabled factors have constantly grown between 2009 and 2014, of which it is important to highlight the total installed capacity and the number of customers. An average growth of about 3.5 million customers per year implies significant investment in power generating facilities and in transmission and distribution lines in order to supply the energy needed. In fact, while in Jawa and Bali there is now enough generation to meet the power demand, shortfalls in electricity supply are often experienced in Sumatera and East Indonesia, as well as in smaller energy systems. In these areas, where the installed capacity does not have a large enough reserve margin, shortage in electricity supply results in extensive use of diesel generating power plants and in blackouts. 2.2.2 DEVELOPMENT PLANS According to the RUPTL [3], Indonesian electricity consumption is expected to more than double between 2015 and 2024, with 464 TWh of energy consumption forecasted for 2024, as shown in Figure 2.4 below. This increase represents a yearly mean growth of 8.7% nationwide, although roughly 70% of the total energy consumption is still related to the Jawa-Bali region. The growth in power demand is, depending on the region considered, associated with different types of costumers: while in Jawa-Bali the growth is mostly related to increase in industrial consumers’ power demand, in Sumatera and East Indonesia this growth is due to the increase of electricity consumption by residential customers, as depicted in Figure 2.5. Short-term solutions to cope with the increase in electricity demand include renting generation capacity, although it is also important to take into account the costs of the existing generation power plants. As such, together with the necessity of satisfying the increasing demand, Indonesia aims to replace the use 12 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT of diesel fuel for more cost-effective energy sources, with the development of renewable energy projects being prioritized, where available, to supply local grids. Figure 2.4 – Regional demand growth between 2015 and 2024. [3] Figure 2.5 – Regional demand growth between 2015 and 2024 per type of customer (TWh). [3] 13 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Considering the increase in energy demand, from 219 TWh in 2015 to 464 TWh in 2024, related to an estimated increase in the electrification ratio from 87.7% to 99.4%, PLN plans on adding 70.4 GW of installed capacity until 2024. According to the RUPTL 2015-2024 [3], with the detailed yearly plan shown in Figure 2.6, 21.4 GW shall be developed by PLN, 35.5 GW by IPPs and the remaining 13.5 GW are yet to be decided. 19 320 Additional installed capacity (MW) 20 000 15 000 9 237 10 000 7 334 6 389 6 147 5 079 4 617 3 783 4 212 4 319 5 000 0 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 PLN IPP Unallocated Figure 2.6 – Additional installed capacity per type of owner and operator. [3] The plans to include this additional capacity are mainly based on the introduction of coal-fired power plants, which account for almost 60% of the total planned additional capacity. Hydropower plants, including SHP in isolated systems, will amount to 13.4% of the total value, followed by combined cycle and geothermal power plants, with contributions of 13.0% and 6.8%, respectively. The information relative to the amount of capacity added each year per type of technology is displayed graphically in Figure 2.7 below. 19 620 Installed capacity (MW) 20 000 15 000 9 237 10 000 7 334 6 389 6 147 5 079 4 617 4 212 4 319 5 000 3 783 0 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Coal Hydro Combined Cycle Geothermal Gas Turbine/Gas Engine Others 14 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 2.7 – Additional installed capacity per type of technology. [3] Indonesia’s investment in coal-fired power plants is particularly evident in 2019, with an increase of more than 16 GW of installed capacity. Analyzing also Figure 2.6, it is possible to conclude that most of the investment in coal-fired power plants is made by IPPs. Finally, it is possible to state that the investment in Gas Turbine/Gas Engine and Combined Cycle power plants is only relevant until 2018. After 2018, apart from the investments in coal-fired power plants, only investments in hydropower and geothermal energy are substantial. PLN has also prepared a development plan for New and Renewable Energy (EBT), where the implementation of several types of renewable power plants are included, using hydropower, PV power plants, biomass and wind energy, among others. Less conventional energy sources, such as ocean energy and crude palm-oil are also planned to be developed. While crude palm oil power plants have been already tested in Indonesia, harnessing the ocean’s energy will be done through pilot projects, as the technology is not mature yet. Moreover, investment in technologies that aim to replace diesel generation is also planned. These power plants consist mostly on gas-fired power plants, either gas turbines, gas engines or combined cycle power plants, with the objective to decrease the operational costs. Figure 2.8 shows the contribution of each type of power plant for the period between 2015 and 2024, totaling 3.4 GW of installed capacity. [3] Installed capacity (MW) 4 000 38 250 3 000 321 385 400 2 000 435 3 371 1 000 1 542 0 Small hydro Biomass Wind Crude palm-oil Solar PV Diesel Ocean Total replacement Figure 2.8 – Development plan for New and Renewable Energy 2015-2024. [3] To meet the power requirements during the period of 2015-2024, RUPTL [3] has also set a mid-period target of installing 35 GW until the end of 2019, excluding 6.6 GW of projects which are already under construction or have been commissioned meanwhile. According to the RUPTL 2015-2024 [3], aside from those 6.6 GW, there are already 17 GW of committed projects and 18.8 GW of projects in the planning stage. Every project until 2019 is already assigned: 18 GW assigned to PLN and 24.9 GW assigned to IPPs, totaling 42.9 GW of new installed capacity between 2015 and 2019. 15 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT The plan for the development of transmission and distribution lines until 2019 is also detailed in the RUPTL [3]. Of the 45 396 km of total planned transmission lines, 9 035 km are 500 kV or 275 kV transmission lines and 36 361 km are 150 kV or 70 kV transmission lines. Additionally, the development of the transmission networks includes plans for 472 new transmission substations. The development plans for the distribution networks comprise the addition of 82 210 km of distribution lines until 2019, roughly 16 500 km of new distribution lines per year. The plans until 2024 will cost a total of 132.2 USD billion, broken down as follows in Table 2.2, bearing in mind that IPPs’ investment is related to generation only. Table 2.2 – PLN and IPP investment between 2015 and 2024 (USD million). [3] Generation Transmission Distribution Total PLN + IPPs 87 100 20 600 14 500 132 200 PLN 24 300 20 600 14 500 69 400 IPPs 62 800 - - 62 800 2.3 SULAWESI 2.3.1 CURRENT SITUATION The island of Sulawesi, the world’s 11th largest island, is separated in six administrative divisions or provinces: Sulawesi Utara, Gorontalo, Sulawesi Barat, Sulawesi Tengah, Sulawesi Selatan and Sulawesi Tenggara. Sulawesi’s power generation by type of technology and per province is shown on Figure 2.9, where major disparities are observed related to the installed capacity in each province – Sulawesi Barat’s 9 MW of capacity contrasts with Sulawesi Selatan’s 1 746 MW, having almost two hundred times less capacity. 16 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Installed capacity (MW) 3 500 78 9 2 930 3 000 234 378 2 500 484 2 000 1 746 1 500 1 000 500 0 Sulawesi Selatan Sulawesi Tengah Sulawesi Utara Sulawesi Gorontalo Sulawesi Barat Total Tenggara Diesel Hydro Steam Turbine Combined Cycle Gas Geothermal Others Figure 2.9 – Installed capacity in Sulawesi per province in 2014. [4] Moreover, the province with the second highest installed capacity, Sulawesi Tengah, with 484 MW already installed, considerably less than Sulawesi Selatan, where more than half of the island’s total generation is installed. Finally, both in the previous figure and in Figure 2.10 below it is possible to observe the predominance of diesel-based generation, followed by hydro and steam power plants. A part of the diesel generation consists of rented power plants, totaling 513 MW of rented installed capacity, which is half of the island’s total diesel-fueled generation. 2.7% 0.1% 6.2% 6.7% Diesel 34.5% Hydro Steam Turbine 20.3% Combined Cycle Gas Geothermal Others 29.5% Figure 2.10 – Installed capacity in Sulawesi in 2014. [4] 17 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Regarding the island’s power transmission, PLN reports that Sulawesi Selatan is the province with the most extensive transmission system, consisting of more than 2.2 thousand kilometers in transmission lines. Of those, almost 95% are 150 kV lines, with the remaining having between 25 and 70 kV. Additionally, it was reported that both Gorontalo and Sulawesi Barat only have 150 kV transmission lines, while other provinces also have 25-30 kV and 70 kV transmission lines. Of all the provinces, Sulawesi Tenggara is the one with the smallest transmission network, comprised only of 24 km of transmission lines. [4] Sulawesi’s distribution network consists of 38 936 km of MV lines and 36 801 km of LV lines. Once more, Sulawesi Selatan has the most extensive distribution network, with more than 25 thousand kilometers of distribution lines. On the other hand, Sulawesi Tenggara’s distribution system, which has approximately 8 thousand kilometers, is more extensive than the one found in Sulawesi Barat, having roughly 2.8 thousand kilometers. [4] Furthermore, Sulawesi’s average electrification ratio is approximately 76.5%, ranging from 69.6% in Sulawesi Utara to 85.1% in Sulawesi Tenggara. Sulawesi Selatan is the province with most customers, accounting for almost half of the total 3.4 million customers in the island, of which most are residential customers. [4] Table 2.3 summarizes the status of Sulawesi’s power generation, transmission and distribut ion in 2014, based on PLN’s 2015 statistics. Table 2.3 – Electricity statistics in Sulawesi per province in 2014. [4] Sulawesi Sulawesi Sulawesi Sulawesi Sulawesi Gorontalo Total Selatan Tengah Utara Tenggara Barat Installed capacity (MW) 1 746 484 378 234 78 9 2 929 PLN (MW) 446 141 292 124 29 3 1 035 IPPs (MW) 1 096 257 3 0 23 4 1 383 Rented (MW) 205 87 83 110 26 2 513 Transmission lines (km) 2 238 275 699 24 648 381 4 265 Distribution lines (km) 25 802 12 229 17 073 7 999 9 872 2 762 75 737 MV (km) 12 018 5 979 12 895 4 236 2 339 1 469 38 936 LV (km) 13 784 6 250 4 178 3 763 7 533 1 293 36 801 Number of customers 1 688 746 486 678 545 731 357 158 198 087 166 398 3 442 798 Electrification ratio 75.6% 85.5% 69.6% 85.1% 74.1% 66.8% 76.5% 2.3.2 DEVELOPMENT PLANS The development plans for Sulawesi until 2025 are shown in Figure 2.11, where almost 5.9 GW of projects are identified throughout the island. RUPTL separates Sulawesi in North and South, considering the Norther part as the Sulbagut system, and the Southern part the as Sulbagsel system. [5] In the north, 1.2 GW of new generation capacity are planned to be added until the end of 2024, mostly consisting of coal-fired power plants, with 714 MW, but also gas, geothermal and hydro power plants, 18 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT contributing with 350 MW, 120 MW and 42 MW, respectively. With the increase of coal-based generation, as well as with the gradual replacement of diesel for gas and combined cycle power plants, the use of oil for power generation is expected to be reduced. [5] The south Sulawesi system development plan includes the integration of the Sulbagsel system, formed by the integration of Sulawesi Tengah, Sulawesi Barat, Sulawesi Tenggara and Sulawesi Selatan systems. This is expected to balance existing deficits in Tengah’s and Tenggara’s systems, as there is a surplus in power generation in Barat’s and Selatan’s systems. The development plans for the region aim to meet the increasing power demand, planning on the installation of 4.6 GW until 2024. A strong bet on hydropower, related to the potential of such resource in the island, is translated in the development of 2.1 GW of installed capacity during the period. Also, 1.2 GW and 1.1 GW of coal and gas-based power plants are expected to be added, as well as 60 MW of geothermal energy. Development plans in south Sulawesi also aim to interconnect sub-systems, as stated previously, including the connection of isolated systems to the grid, with the development of the transmission system. Again, oil-based power generation is expected to be reduced through the addition of other energy sources. This type of generation is expected to be stopped by the end of 2019. [3], [5] 19 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 2.11 – Development plans in Sulawesi between 2016 and 2025. [5] 2.4 MALUKU & MALUKU UTARA 2.4.1 CURRENT SITUATION The Maluku islands, an archipelago of approximately one thousand islands, were split in two provinces in 1999: Maluku and Maluku Utara (North Maluku). Based on PLN’s statistics in 2015 [4], both provinces relied almost exclusively on diesel-fueled power plants, as shown in Figure 2.12, whether owned or rented by PLN. While Maluku Utara has a 100% diesel-based system owned by PLN, totaling 48 MW, Maluku’s electricity is generated through 0.9 MW of solar power plants and 294.2 MW of diesel generation, of which 146.7 MW are owned by PLN and the 20 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT remaining 99.5 MW are rented. Also, there are no IPPs operating on either of the provinces. As such, in the Maluku archipelago only 0.3% of the generation is non-diesel. 48 295.1 Installed capacity (MW) 300 247.1 200 100 0 Maluku Maluku Utara Total PLN Diesel Rent Diesel PLN Solar Figure 2.12 – Installed capacity in Maluku and Maluku Utara in 2014. [4] The power plants in Maluku Utara are spread throughout the province, and most of the smaller systems are connected directly to the 220 V low voltage network. Similarly, in Maluku the power generation system consists mostly on scattered small diesel-fueled generation units connected to the low voltage network, although there is also solar capacity installed. Table 2.4 contains a summary of the relevant information about Maluku’s and Maluku Utara’s power sector. In this table, it is possible to see that there is no transmission system in any province, as the demand is mostly residential and fairly concentrated, with poorly developed systems in some islands. The existing distribution networks total 5 738 km in Maluku and 3 670 km in Maluku Utara. Additionally, every MV distribution line has between 15 and 20 kV, with only 4 of the 41 Indonesian regions considered in PLN’s Statistics having MV lines with lower voltages. [4] 21 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Table 2.4 – Electricity statistics in Maluku and Maluku Utara in 2014. [4] Maluku Maluku Utara Total Installed capacity (MW) 247.1 48 295.1 PLN (MW) 147.6 48 195.6 IPPs (MW) 0 0 0.0 Rented (MW) 99.5 0 99.5 Transmission lines (km) 0 0 0 Distribution lines (km) 5 738 3 670 9 408 MV (km) 3 885 2 281 6 166 LV (km) 1 853 1 389 3 242 Number of customers 270 044 172 312 442 356 Electrification ratio 74.7% 82.3% 79.0% 2.4.2 DEVELOPMENT PLANS Maluku Electricity consumption in Maluku is expected to increase almost threefold between 2016 and 2025. Such projection leads to an urgent planning of additional capacity, as certain issues related to shortage in power supply arise. Especially in Ambon, but also in other regions, power supply is inadequate and still relies on diesel. The implementation of a non-oil power generation and a transmission system remains the bottleneck in Maluku’s power sector development. [5] Development plans in the region include not only the addition of new capacity, but also the reduction of diesel dependence. To meet the power requirements, priority will be given to renewable energy sources, such as hydro, geothermal and solar power plants. Additionally, the development of gas-fired power plants is expected to assist in meeting the power demand, including a 30 MW power plant in Ambon, expected to be operational by the end of 2017. A total of 535.8 MW are expected to be installed in Maluku, as shown in Figure 2.13, where it is possible to observe the amount to be invested in gas generation technologies. Additionally, diesel power plants will be built in the smallest and outermost islands, to ensure a sufficient supply of electricity near the border. [5] 22 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Installed capacity (MW) 600 10 6 535.8 20 20 54.8 130 400 295 200 0 Gas Steam Hydro Geothermal Wind Solar Biomass Total Turbine/Engine Figure 2.13 – Power generation development plant in Maluku between 2016 and 2025 (RUPTL). Along with the development of the power generation plants, 70 kV and 150 kV will be built in Maluku, to supply power from the plants to the load center. During the period 2016-2025, a total of 663 km of transmission lines will be built, of which 337 km and 326 km are 70 kV and 150 KV transmission lines, respectively. The plans for power generation and transmission networks in the islands of Ambon, Seram and Buru are shown in Figure 2.14 and Figure 2.15. The investment in the transmission system amounts to approximately 96 USD million of the 896 USD million for Maluku’s power sector development. [5] As for the distribution networks, their development is expected to connect around 154 thousand new customers until 2025, with the addition of 2 246 km of distribution lines. This aims to increase the rural electrification ratio, as well as to connect isolated systems with renewable generation potential that still rely of diesel-based power generation. [5] 23 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 2.14 – Development plans in Ambon and Seram between 2016 and 2025. [5] Figure 2.15 – Development plans in Buru between 2016 and 2025. [5] 24 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Maluku Utara The development plans for power generation, transmission and distribution in Maluku Utara aim to deal with the increasing electricity needs in the province, and they envisage exploiting the potential of primary energy in the region, taking into account the local geographical conditions. These plans include the addition of 380 MW of new capacity, as seen in Figure 2.16, mostly based on gas turbine and gas engine power plants, but also including steam turbines, geothermal energy and solar power plants. As non-oil power plants are still being developed in Maluku Utara, mobile dual fuel power plants, using both gas and diesel, will be used in the short-term to avoid power deficits in the system. These dual fuel power plants will also be used in scattered islands to guarantee power supply and, together with the optimization of geothermal energy systems, small-scale power plants will be gradually replaced. Finally, given the strategic importance of islands bordering with neighboring countries, power generation in those regions will be developed so as to ensure sufficient supply. [5] Installed capacity (MW) 400 200 0 Gas Turbine/Engine Steam Geothermal Solar Total Figure 2.16 – Power generation development plant in Maluku Utara between 2016 and 2025. [5] As shown in Figure 2.17, there is also a transmission system planned to be developed in Maluku Utara, specifically in the island of Halmahera. This network is particularly intended to connect geothermal power plants to the load centers. Given the distance between them, 436 km of a 150 kV transmission line will be constructed, including submarine lines. Of the total 710 USD million required for the power sector development, 64 USD million are related to investment in transmission networks. [5] The development of the distribution network in Maluku Utara is intended to connect 107 thousand new customers until 2025, while connecting the islands that have renewable and cheap energy potential to nearby islands where such potential does not exist. The plans for electricity distribution development include 1 429 km of distribution lines. [5] 25 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 2.17 – Development plans in Halmahera between 2016 and 2025. [5] 2.5 NTT 2.5.1 CURRENT SITUATION Nusa Tenggara Timur (NTT) is an Indonesian province consisting of 566 islands. The most significant regions are the islands of Flores and Sumba, and the western part of Timor Island. As observed in Figure 2.18, NTT’s power sector is dominated by diesel generation, as almost 82% of the 289.1 MW installed by the end of 2014 was fueled by diesel. The remaining 52.4 MW consist mostly on steam and geothermal power plants, with a smaller share of hydro, solar and wind power generation systems. Due to the large share of diesel used to generate power, the electricity production costs in NTT are high. [4] Additionally, only 3.6 MW of the installed capacity in NTT are owned and operated by IPPs, with PLN owning and operating 195.6 MW and renting the remaining 89.7 MW. [4] 26 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Some of the generation plants operate separately, using 20 kV MV lines, while some smaller systems, especially diesel-based ones, supply power directly at 220 V. Solar power generation, through the use of solar home systems, is mainly used to supply electricity in isolated regions, far from the urban centers, where the load demand is still small. [4], [5] Diesel 13.8 Steam Geothermal 236.7 52.4 3.6 Hydro 33.0 2.0 Solar 0.1 Wind Figure 2.18 – Installed capacity in NTT in 2014 (MW). [4] Although PLN reports that by the end of 2014 there were no transmission lines in NTT in their 2015 Statistics report [4], 70 kV transmission lines in some systems are mentioned in the later RUPTL 2016-2025 [5]. Considering the distribution networks, a total of 13 121 km of distribution lines are already operating, of which 6 024 km are MV and 7 097 km are LV distribution lines. [4] Table 2.5 contains a summary of the power sector in NTT by the end of 2014. It is important to mention that NTT’s electrification ratio in 2014, 58.9%, was the lowest provincial electrification ratio in all Indonesia, behind Sulawesi Barat’s 66.8%, the second lowest ratio. 27 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Table 2.5 – Electricity statistics in NTT in 2014. [4] NTT Installed capacity (MW) 289.1 PLN (MW) 195.6 IPPs (MW) 3.8 Rented (MW) 89.7 Transmission lines (km) 0 Distribution lines (km) 13 121 MV (km) 6 024 LV (km) 7 097 Number of customers 618 330 Electrification ratio 58.9% 2.5.2 DEVELOPMENT PLANS In order to satisfy the increasing power demand in the province, to further electrify the region, and to reduce diesel fuel dependence, so as to reduce operational costs, new power generation capacity is planned to be installed in NTT between 2016 and 2025. As Figure 2.19 shows, power generation addition comprises 736.5 MW of installed capacity, primary constituted by steam and gas-based power plants, but also with geothermal power plants playing an important role. The remaining generation is planned to be from renewable technologies, including solar, wind, hydro and biomass power plants. Installed capacity (MW) 800 19.5 14 736.5 20 30 110 600 270 400 273 200 0 Steam Gas Geothermal Solar Wind Hydro Biomass Total Figure 2.19 – Power generation development plant in NTT between 2016 and 2025. [5] Similarly to what is being done in other Indonesian regions, in order to avoid short-term power deficits in some of the systems with increasing power needs, dual fuel power plants are also being considered. 28 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT For example, to overcome this problem in Kupang, a 40 MW dual fuel power plant, using both gas and diesel, is expected to be operational in 2017. Where renewable potential is available, power generation from renewable energy sources is being prioritized. In Flores, an island with great geothermal potential, 100 MW in geothermal power plants are planned to be installed, of the total 110 MW in NTT. [5] Once more, given the relevance of power supply near the borders to maintain the Republic’s integrity, additional capacity in Timor will be considered as needed. In addition to this, as an effort to provide reliable power near the border with Timor Leste, PLN will cooperate with Timor Leste’s utility, EDTL, which may include the connection of both countries distribution networks near the border. [5] The development of NTT’s power sector also comprises a transmission development plan in the three major islands, with 70 kV and 150 kV transmission lines expected to be built in Flores, Timor and Sumba, as is shown in Figure 2.20, Figure 2.21 and Figure 2.22, respectively. The transmission system will be constructed in harmony with the development of power plants scattered on the islands, with a total of 1 924 km of transmission lines planned. This entails an investment of approximately 284 USD million in transmission, from the total required investment of 1 667 USD million. [5] Finally, to support the addition of about 694 thousand new customers, 7 225 km of distribution lines are planned to be added in NTT, with 20 kV distribution lines, as well as well as low voltage distribution lines. [5] Figure 2.20 – Development plans in Flores between 2016 and 2025. [5] 29 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 2.21 – Development plans in Timor between 2016 and 2025. [5] Figure 2.22 – Development plans in Sumba between 2016 and 2025. [5] 30 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 3 SMALL HYDROPOWER ROLE 3.1 CONTEXT Access to electricity is a key factor for the development of a country and its population, as it provides light, heat and power for productive uses and communication, among others. With a worldwide increase in power demand, and Indonesia, as seen before, being no exception, sustainably increasing power generation sources is crucial. In this context, SHP arises as a renewable and sustainable alternative for power generation. Additionally, their low energy cost provides a cost-effective solution for regions where grid-connection is not yet feasible, while cutting down the high carbon emissions of the commonly-used diesel generators. In this chapter, the SHP role in power generation is reviewed and analyzed, taking into account the Indonesian context. Firstly the legal framework concerning the planning and developing of SHP plants is thoroughly examined. The following section includes the study of strengths and weaknesses of using SHP plants, focusing their use in isolated systems. Lastly, the challenges pointed out in the previous sections are studied and possible solutions are suggested in the last section. 3.2 REVIEW OF THE CURRENT LEGAL FRAMEWORK 3.2.1 ELECTRICITY SECTOR The Electricity sector is regulated by the Ministry of Energy and Mineral Resources (MEMR) and its sub- agencies – the Directorate General of Electricity (Direktorat Jenderal Ketenagalistrikan) and the Directorate General of New and Renewable Energy and Energy Conservation (Direktorat Jenderal Energi Baru, Terbarukan Dan Konservasi Energi). According to the Electricity Law No. 30/2009, electricity development shall aim to guarantee the availability of power at adequate quantity, good quality, and reasonable price to improve public welfare and prosperity in a just and distributive manner as well as to realize sustainable development. Energy policy objectives are based on the Presidential Decree No. 5 of 2006 on National Energy Policy (Kebijakan Energi Nasional – KEN) and its Blueprint of National Energy Management 2005-2025 (Pengelolaan Energi Nasional – PEN). The 2005-2025 National Energy Blueprint specifies 500 MW on grid and 330 MW off grid targets for small scale hydropower energy production. The MEMR is responsible for developing the electricity master plan (RUKN – Rencana Umum Ketenagalistrikan Nasional) which sets out, amongst others, a ten year estimate of the power demand and supply, the investment and funding policy, and the approach to the utilization of new and renewable energy resources. RUKN is reviewed annually and is the source for the Electrification Development Program (RUPTL – Rencana Usaha Penyediaan Tenaga Listrik) and Regional General Plan 31 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT of Electricity (RUKD – Rencana Umum Ketenagalistrikan Daerah). The current RUKN is for the period 2016-2035. RUPTL constitutes the official ten year power development plan prepared by PLN with MEMR approval. The RUPTL contains demand forecasts, future expansion plans, energy production, and fuel requirements and indicated which projects will be developed by PLN and IPP investors. As RUKN, RUPTL is also reviewed annually. The current RUPTL is for the decade 2016-2025. The bidding process for new capacity is generally on a competitive basis, in line with the private sector participation according to Perpres No. 67/2005 and amended by Perpres No. 13/2010. However, for the renewable energy projects, Direct Appointment is a common practice in the sector. The process usually undertaken for small hydropower IPP direct appointment method is presented in Figure 3.1. 32 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT DIRECT APPOINTMENT METHOD PLTM IPP ≤ 10 MW PLN MESDM DEVELOPER PLN PUSAT REGION (MEMR) DIV EBT PROPOSAL - KKO , KKF, AR - PRE QUALIFICATION DIRECT APPOINTMENT PERMIT PROPOSAL DATA EVALUATION DIRECT APPOINTMENT PERMIT PROPOSAL DIRECT APPOINTMENT PERMIT REQUEST PUBLIC ELECTRICITY PROVIDER DIRECT APPOINTMENT SEND TO PLN REGION PERMIT (IUPTL) TEMPORARY A PUBLIC ELECTRICITY PROVIDER PERMIT (IUPTL) TEMPORARY A PRICE EVALUATION Yes FIT 04 / 2012 No PRICE ESTIMATION NEGOTIATION PRICE PROPOSAL PICE PROPOSAL PRICE APPROVAL SENT TO PLN REGION No GM AUTHORITY BOD PRINCIPAL PERMIT Yes PPA FC REQUEST PUBLIC ELECTRICITY PROVIDER PERMIT (IUPTL) COMMERCIAL OPERTION DATE (COD) Figure 3.1 – Flowchart for direct appointment method for SHP. 33 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT The developer submits its proposal to the PLN regional office for Pre-qualification with its operational and financial feasibility study and risk assessment. The PLN regional office sends the direct appointment permit proposal to the PLN central office (PLN Pusat), whom through DivEBT makes a data evaluation and forwards the direct appointment permit proposal to the MEMR for his approval. If direct appointment permit is approved, PLN ’s regional office starts the process of price evaluation. Currently SHP may benefit from the feed-in tariff (FiT). In that case, the process avoids the price negotiation and runs directly to approval, from the region or the Board of Directors, depending on the amount of investment. On 29 June 2015, the MEMR issued a new FiT regulation for hydropower projects with a capacity up to 10 MW (SHP). Regulation No. 19 of 2015 on Power Purchase from Hydro Power Plants with a Capacity up to 10 MW by PLN replaces MEMR Regulation No. 12 of 2014 as amended by MEMR Regulation No. 22 of 2014. Reg. 19 suggests that the intention of the new FiT regulation is to accelerate development of SHP to attract more investment by local and foreign investors. The previous Reg. 12, featuring Rupiah-based tariffs, has been criticized by the industry as having been set too low, particularly considering the continued depreciation of the Rupiah against the US Dollar and the necessary equipment. So the recent move by Government to set the tariffs in US Dollar terms, Table 3.1, and generally increase tariff levels, will hopefully increase investment in the sector. Table 3.1 - Feed-in tariff levels. FIT Tariffs (US$ cent/kWh) Voltage/ Multipurpose Dams and/or F Factor - Depending on SHP Location Capacity Hydropower single use Irrigation Year 1 - 8: 12.00 x F Year 1 - 8: 10.80 x F • Jawa, Bali, dan Madura: 1.00 Medium voltage • Sumatera: 1.10 (Up to 10 MW) Year 9-20: 7.50 x F Year 9 - 20: 6.75 x F • Kalimantan dan Sulawesi 1.20 • Nusa Tenggara Barat dan Nusa Tenggara Year 1 - 8: 14.40 x F Year 1 - 8: 13.00 x F Timur: 1.25 Low voltage (Up to 250 kW) • Maluku dan Maluku Utara: 1.30 Year 9 - 20: 9.00 x F Year 9 - 20: 8.10 x F • Papua dan Papua Barat: 1.60 It should be stressed that all SHP tariffs are set out in US Dollar but the payment of the invoice by PLN will be made in Indonesian Rupiah based on Bank Indonesia middle exchange rate at 11.00 West Indonesia Time one day prior to the invoice date. After the financial close of the PPA, the developer must request an Electricity Business License (IUPTL – Izin Usaha Penyediaan Tenaga Listrik). A business license must be granted before an entity can supply electrical power or run an electrical power-supporting business. In this sense, a business license to supply electricity for public use is required. The IUPTL must be required by the IPP and it is issued by the Central Government. Otherwise, the IPP may only sell power to PLN (already an owner of an IUPTL). 34 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 3.2.2 OTHER REQUIRED LICENSES Apart from the licenses and requirements from the electric sector, the additional required licenses for SHP development in Indonesia are long. From the meetings held during the assignment, it was mentioned that all the required processes, the different length, agencies, the different concessional durations are considered obstacles to hydropower development. The list of the identified official licenses is presented in Table 3.2. Table 3.2 – Other required licenses. Required Licenses Prinsip Pemakain Sumber Daya Air Water resources use license Izin Pemanfaatan Air Permukaan (SIPAP) Surface water use license Izin Mendirikan Bangunan (IMB) Building construction permit Izin Pelaksanaan Konstruksi Construction implementation license (other than IMB) Izin Gangguan (HO) Disturbance permit Upaya Pengelolaan Lingkungan (UKL) Environmental licenses Upaya Pemantauan Lingkungan (UPL) Angka Pengenal Importir Importer identification number Izin Pemakaian Kawasan Hutan Forest permit Izin Lokasi Location permit Izin Prinsip Principle License Of those it should be highlighted that the environmental and forest licenses are the most critical licensing processes, and are better described in the following subchapters. Additionally, it is also worth mentioning the Principle License that is a mandatory document for companies looking to establish a new business. As a mandatory document, the Principle License is a prerequisite for the securing of other licenses, permits, and non-permits from both central and local governments. The Head of the Indonesian Investment Coordinating Board (BKPM – Badan Koordinasi Penanaman Modal) recently issued Regulation No. 14 of 2015 on the Guidelines and Procedures for Principle Investment Licensing (“2015 Regulation”). As a part of President Joko Widodo’s economic-policy packages, the 2015 Regulation simplifies the procedure for the securing of a Principle License (izin prinsip) for investment activities. Prior to the 2015 Regulation, these procedures were regulated under Head of BKPM Regulation No. 5 of 2013 on the Guidelines and Procedures for Investment Licenses and Non-Licenses, as amended by Regulation No. 12 of 2013 (“2013 Regulation”). The 2015 Regulation is of relevance to investment companies, as well as to the officials who will be supervising the One-Stop Integrated Services (PTSP – Pelayanan Terpadu Satu Pintu) procedures for principle licenses across all levels and areas (central, provincial, regency/municipality, free-trade areas and free markets, as well as special-economic zones). 35 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Moreover, the local governments stated when visited that the regional offices are still adjusting to this new law and that for the moment it is very confusing who is in charge of what in the licensing process. For this reason, no principle licenses are currently being issued, since the regency’s offices don’t have the power to license and the provincial offices are still adjusting to the new legislation. 3.2.3 ENVIRONMENTAL ADMINISTRATION On February 23, 2012, the Government of Indonesia issued Government Regulation No. 27 of 2012 regarding Environmental Permits (“GR 27/2012”). GR 27/2012 is an implementing regulation of the recent 2009 Environmental Law (Law No. 32 of 2009) and revokes Government Regulation No. 27 of 1999 (“GR 27/1999”) which previously regulated two types of environmental reporting and compliance for companies operating in Indonesia: an Environmental Impact Analysis Report (“AMDAL”) and an Environmental Management/Monitoring Efforts Report (“UKL – UPL”). The aim of GR 27/2012 is to provide greater legal certainty for businesses in terms of environmental licensing while ensuring the protection and management of the natural environment. The key requirement of the new regulation is the environmental permit. The idea of an Environmental Permit was initially introduced by the 2009 Environmental Law, but has not been implemented until now. In brief, any business which currently requires either an AMDAL or an UKL-UPL also requires an environmental permit. The environmental permit is also a requirement for obtaining a business permit. In the event the Environmental Permit is revoked, the business permit will also be cancelled. Under GR 27/2012, companies must still apply for and receive approval of an AMDAL or UKL – UPL. As an additional requirement, companies must now also apply for an environmental permit. Both the environmental permit and AMDAL or UKL – UPL approval should be issued on the same day. An environmental permit shall report the requirements and obligations which have been stated in the approval of the AMDAL or UKL – UPL. Additional requirements may be added as stipulated by the issuing authority (e.g. Minister of Environmental Affairs, Governors, or Regents/Mayors). The type of business plans and/or activities that must have an AMDAL are indicated in State Ministry of Environment Regulation No.11/2006. Table 3.3 presents those related with electricity and energy utilization. 36 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Table 3.3 - Electricity and energy utilization activities needed to conduct an AMDAL. NO ACTIVITY SCALE 1 Construction of the transmission network > 150 kV 2 Development ≥ 100 MW a. PLTD / Gas Power Plant / Power Plant / Combined Cycle (in one location) Power Plant b. Development PLTP (geothermal development) ≥ 55 MW c. Hydroelectric Development by: - High dam, or ≥ 15 m - Areas of inundation, or ≥ 200 ha - Installed capacity ≥ 50 MW d. Construction of power plants from other species (such as: OTEC (Ocean Thermal Energy Conservation), Solar, Wind, ≥ 10 MW Biomass, Peat, etc.). In terms of SHP (under 10 MW), the developments under 15 m and with inundation reservoir area under 200 ha will not need to conduct AMDAL. This will allow to effectively speed-up the implementation of the SHP projects, as the procedures for AMDAL can be very time consuming. Figure 3.2 describes the AMDAL procedures based on the GR 27/2012. According to the State Ministry of Environment Decree No.8/2006 the necessary documents for the AMDAL are: 1) Terms of References Framework for Environmental Impact Analysis (KA-ANDAL)  KA-ANDAL is prepared for framing the scope and depth of Environmental Impact Analysis (ANDAL). 2) Environmental Impact Analysis (ANDAL)  ANDAL describes expected significant environmental impacts, evaluation of the impacts including selection of alternative and preparation of appropriate environmental mitigation measures in terms of implementation of the proposed project. 3) Environmental Management Plan (RKL)  RKL statements environmental management approaches for mitigating environmental negative impacts forecasted in ANDAL. 4) Environmental Monitoring Plan (RPL)  RPL examines the effectiveness of proposed environmental management plan. 37 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 3.2 – Scheme of the AMDAL procedures. The AMDAL committee is established to review the AK-ANDAL, ANDAL, RKL and RPL for the proposed project. The Committee will be established by approval authorities such as Minister of Environment, 38 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Governor and Mayer decided depending on the size of the proposed project. According to GR 27/2012, the AMDAL committee consists of following members.  Representative from environmental institution;  Representative from technical institution;  Expert in the kind of effort and/or activity studied;  Expert in the impacts that may occur from effort and/or activity studied;  Representative from community to be effected by the impact; and  Representative from Non-Governmental Environmental Organization. The AMDAL committee is also classified into the central, provincial and district depending on the category and size of the proposed project. The State Ministry of Environment Decree No.5/2008 indicates the responsible AMDAL committee for each category and/or size of the proposed project as follows:  Central AMDAL Committee: assess business and / or activities located in more than one area of the province; in the territory dispute with another country;  Provincial AMDAL Committee: assess business and / or activities located in more than one district / city and/or in cross-district / city; and  District AMDAL Committee: assess business and / or activities located in single district. An environmental management efforts and environment monitoring efforts (UKL-UPL) is required for projects or activities smaller than those requiring an AMDAL. In principle, the AMDAL is a study of the potential significant impact of the proposed business activity on the environment, while the UKL-UPL covers monitoring and management efforts undertaken for business activities which are not likely to have significant impact on the environment. Unlike AMDAL, a UKL-UPL is not a formal certificate, and does not include conditions requiring the applicant to mitigate impacts – it simply requires that a narrower list of environmental impacts be considered in the decision making process. 3.2.4 FORESTRY ADMINISTRATION Forests in Indonesia are classified into three major types depending on the functions and objectives, as production forest (Hutan Produksi), protection forest (Hutan Lindung) and conservation forest (Hutan Konservasi) according to the Article 6 in the Law of the Republic of Indonesia No. 41 of 1999. Production forest is defined as the forest area where production of forest products is sought for. Protection forest is the forest area having the main function to sustain water resources, to prevent flood, erosion, water intrusion and to maintain land fertility. Conservation forest is the forest area which the principle function is to conserve bio-diversity and ecosystem. The Utilization of forest area by development activities beside forestry production is only allowed in production forests and protection forests in accordance with the Article 38 in the Law of the Republic of 39 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Indonesia No. 41 of 1999. Therefore, it’s not allowed to explore conservation forests for other purpose than forestry production. The additional development activities possible beside forestry production are defined in the Republic of Indonesia’s Forestry Minister Regulation No.16 of 2014, and listed in the following table. Table 3.4 – Utilization of forest areas by development activities beside forestry production, P.16/Menhut-II/2014. Forest Classification Development activities  Religious places of worship, cemeteries and spiritual tourist places;  Mining including means and infra-structures of oil, gas, minerals, coal and geothermal;  generation, transmission, and electrical distribution installation, as well as new and renewable energy technologies;  Development of telecommunication networks, radio transmission stations, and Production Forest television relay stations; (Hutan Produksi)  Public roads, highways, and railways;  transportation uncategorized as public transport for manufacturing products transportation;  water resources facilities and infrastructures, development of water installation Protected Forest networks, and clean water and/or waste water channeling; (Hutan Lindung)  public facilities;  forestry related industries;  defense and security;  infrastructure supporting public safety;  temporary shelter places for natural disaster victims;  Agriculture for food security; or  Agriculture for energy security. 3.3 STRENGTHS AND WEAKNESSES OF USING SMALL HYDROPOWER IN ISOLATED SYSTEMS 3.3.1 CONTEXT Renewable energy sources can be used to help countries meet their sustainable development targets, through the provision of clean, secure and affordable energy. These factors stimulated an intensive addition of renewable capacity that is still on-going, with tens of gigawatts of wind, hydropower and solar PV capacity being added every year [10]. According to a 2015 IRENA report [11], the largest source of renewable generation for mini-grids is SHP systems (1-10MW). The deployment of renewable energy technologies in off-grid systems is growing steadily, stimulated by the decline in costs and the increase in efficiency of small hydro, solar PV and wind energy systems, together with cost reductions and technological improvements in electricity storage and control systems. Off-grid energy systems are required to connect a vast number of people in regions where grid connection is not economically feasible or geographically constrained. Particularly, power distribution in 40 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Indonesia is subject to geographical constrains associated mainly to the number of islands that it comprises and to the extension of the country. Moreover, isolated systems based on renewable energies provide local communities with local, clean and cost-effective energy sources, reducing both the generation costs and the polluting emissions associated to the use of diesel gensets. However, every type of system has strengths and weaknesses, and SHP are no exception. It is also important to state that although SHP plants contain most of the defining characteristics of Medium and Large Hydro Power plants, since the principles of how the resource is harnessed are the same, social and environmental impacts of larger schemes are not as aggravated. This is especially true in run-of-river power plants, where there is little or no water storage, as in most cases only a small dam is built. 3.3.2 STRENGTHS 1. SHP has often the lowest LCOE for electricity generation. An IRENA’s report [11] states that SHP is frequently presented as the cheapest technology for rural electrification where hydro resources exist, even when considering its substantial investment costs. Lower energy prices not only benefit the residential consumers, by providing them access to affordable electricity, but also stimulate commercial and industrial competition, with the reduction of operational costs. SHP costs are mostly related to its initial investment, particularly in civil works, but also in electrical connections, in case the power plant is distant from the demand center. In remote projects, electrical connection costs dominated the total LCOE, while infrastructure and logistical costs contributed more in sites far from existing infrastructure. 2. There is no need for fuel. SHP is a renewable energy source, harnessing the kinetic energy of moving water, requiring no fuel for power generation. This not only implies a significant reduction in operational costs, as there are no fuel imports, but also that such costs are not dependent on volatile fuel prices. Considering Indonesia’s reliance on diesel-based generation, particularly high in electrical systems farther from Jawa-Bali such as Sulawesi, Maluku and NTT, using renewable energy sources may allow considerable savings. 3. SHP is a clean and environmentally-friendly energy source. Along with the lack of need for fuel, the substitution of conventional energy sources, such as diesel, with renewable energies like SHP, allows the replacement of highly polluting sources of energy for clean ones, thus helping in the reduction of CO2 emissions, contributing to climate change mitigation. Moreover, SHP plants can usually harness the renewable energy with minimal alteration of the environment, which is especially true in run-of-river power plants, where the inundated area required is not as large. [12] 4. Its construction can and should be aligned with local communities’ inte rests. An effective way to mitigate possible social and environmental impacts of hydropower is to develop hydropower plants in such a way that it is aligned with the interests of the affected communities, allowing a smoother process and strengthening relationships between the community and the project. The 41 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT power plant can be integrated in an existing infrastructure, or be developed to support other uses, such as land irrigation or water processing plants. Additionally, local people can often run the scheme, do minor repairs and change spare parts, if the proper capacity building is provided, enhancing this way the development of skills in the community. [13] 5. Hydropower is predictable and reliable. Especially when compared to other renewable resources, such as solar radiation or wind, hydropower is consistent in short timescales, being this way much more predictable, and providing a continuous power source. Furthermore, power plants with larger reservoirs can be used for load regulation. Nonetheless, hydropower is subject to extreme weather phenomena and to seasonal weather conditions, often presenting significant energy variations throughout the year. 6. SHP is a mature and long-lasting technology. Hydropower is used for generating electricity since the 19th century, being a well-proven and mature technology. SHP plants are also long-lasting, reputed for their longevity of more than 50 years. [10] 3.3.3 WEAKENESSES 1. Power production is highly seasonal. Seasonal variations in water supply directly affect power generated in SHP plants. Consequently, during the dry-season there is usually less water available, and the plant may not generate power at its rated capacity. This requires advance planning to ensure adequate energy generation throughout the year and generally implies the need for backup generation, as thermal power plants. SHP plants with little or no reservoirs are further dependent on the availability of the resource, having no ability for energy storage. SHP energy generation is also highly vulnerable to extreme weather phenomena, such as droughts, that greatly reduce the plant’s production, or floods, which might compromise the integrity of the structure. [13], [14] 2. In-depth feasibility studies are required. SHP plant development requires knowledge of the geomorphological and hydrological characteristics of the site, so as to obtain reliable predictions of the availability and time distribution of the flow rates. As such, the assessment of a hydropower project relies heavily on the quantity and quality of basic information and historical data. Weak feasibility studies may have negative impacts on the project quality and efficiency, possibly leading to costly design corrections and maintenance problems. On addition to this, feasibility studies should take into account their impact downstream, as a power plant upstream may render unfeasible a more attractive project in a downstream location. [14] 3. The power plant size is constrained by both the location and the demand. On the one hand, in order to produce electricity a site with good hydro potential is necessary. Moreover, the power plant capacity cannot exceed the site’s resource potential. On the other hand, taking into account the situation for isolated grids, the plant capacity is further constrained by the energy demand, which can negatively affect the feasibility of the SHP plant as the cost of electricity 42 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT generation is subject to considerable economies of scale. Finally, sudden variations in power demands from small load centers imply the need of load control systems. [15] 4. Hydropower is paid upfront and there may exist several constraints beforehand. Investment in SHP plants is capital intensive, as the majority of the costs are relative to the initial investment. Moreover, there may be some limitations related to access to long-term financing, as investors and governments sometimes prefer larger projects, with more social visibility and less risk. As such, local populations with support and limited financial resources may choose cheaper short-term solutions, even if they are not cheaper in the long term. Long and costly connections between the power plant and the consumers might also discourage the development of some SHP projects. Lastly, the process of obtaining land, permits and concessions is often seen as complex, unpredictable and excessively long, sometimes hindering or even blocking the power plant’s development. [13] 5. SHP plants have negative impacts on the environment and local communities. Besides the good social and environmental impacts addressed above, such as low cost clean energy, local economy boosting or other uses of the reservoir, SHP may have some negative impacts as well. Even though SHP plants do not have negative environmental and social impacts as significant as larger plants do, these impacts still exist. As silt and sediment are removed from the water to protect the turbines’ blades, SHP schemes, if not carefully engineered, may change the level of suspended solids in the water, thus altering the river’s ecosystem downstream. Furthermore, the diversion of streams should be thoroughly analyzed beforehand in order to evaluate its possible impacts, and the construction of additional support infrastructure (transmission lines, roads and bridges, among others) might damage the surrounding environment. Finally, SHP plants usually require submerging land on the reservoir area. On the one hand, this releases methane and carbon dioxide as the flooded organic materials rot. On the other hand, such flooding may require the displacement of communities living nearby, whose relocation can be problematic if not addressed properly. [12] 3.4 POSSIBLE SOLUTIONS TO IDENTIFIED CHALLENGES In order to mitigate the consequences of the weaknesses identified previously, it is necessary to point out courses of action that can be followed. Not taking into account such limitations may affect the good operation of SHP generation systems, possibly compromising their inherent advantages. UNIDO’s “Projects for the Promotion of Small Hydro power for Productive Use” report [14] provides an example of what may occur in cases where best practices or risk-mitigation strategies are overlooked. That example takes place in Nias, Indonesia, where a SHP plant financed by post-crisis funds was installed in 2008. Its installation aimed to provide a rural community in Nias with environmentally sound, affordable and adequate electricity, which was expected to have positive social impacts and to stimulate productive use and income-generating activities. 43 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT However, when the project was later evaluated, the power plant was not operating. Each targeted house had installed its own load management system, exceeding the load capacity of the power plant, shutting it down each time it was turned on. The lack of agreement between users resulted in a continuous shut down of the power plant. According to what was found by the evaluation team, several hindering factors promoted this. To begin with, households were not adequately involved and consulted. The local entity in charge of the operation was not trusted by the community. There was no criteria defining how the limited supply of electricity should be distributed, or to which end it should be allocated. This resulted in a lack of sense of ownership from the community, subsequently affecting minor repairs that were needed and that could have been performed by locals, even though the project document had foreseen the need to involve the local community in operating and maintaining the SHP. Meanwhile, additional funds were released to mobilize the community to take over and operate the SHP and to deliver income-generation equipment (mill, sewing machines, etc.). In conclusion, future projects of the sort should ensure from the start that the targeted community is mobilized and ready to operate and maintain the power plant, and that they agree on how the electricity will be shared. Taking the above example into account, each weakness and challenge identified previously is addressed and possible solutions are suggested, so as to diminish the inherent risks. 1. Power production is highly seasonal. Seasonal variations in power production are related to water availability, and so during the dry season hydropower resources are usually limited, limiting this way the firm power. To begin with, it is necessary that this variation is properly assessed, in order to optimize the SHP plant’s design according to the existing conditions and to ensure there is energy generation throughout the whole year. This might not be a problem if the power plant’s size is limited by power demand, and its rated capacity is near the minimum flow capacity. If otherwise, additional generation will be needed, in which case the technical and economic feasibility of hybrid systems should be analyzed. Such systems can use other renewables as solar or wind energy. Solar energy, for instance, presents the opposite seasonal variations from hydropower, generating more energy during dry months and less energy in the rainy season. Since using a fully-renewable system might not be cost efficient, in most cases thermal power plants are used as backup. In isolated grid systems with low energy demand, this usually means having diesel-fueled power generation units, despite their high operation costs. [11], [14] 2. In-depth feasibility studies are required. In order to better assess a site’s potential, as well as technical parameters that affect its efficiency, feasibility studies are necessary. The weakness of such studies may have negative consequences on the project and lead to costly corrections during the project execution. It is also desirable to have historical records of river flows and other meteorological data. Each study should be performed by experts, guaranteeing this way the accuracy of the results. In an initial phase, gathering data from existing weather stations in the area, as well as using satellite or other available data sources, might shorten the necessary time to evaluate a specific site. A key- 44 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT factor to promote these studies’ effectiveness is the communication between the evaluation team and the local or national authorities, whose access to such data is probably easier. [12], [13] 3. The power plant size is constrained by both the location and the demand. Given that these constraints are applicable to almost every local energy generation source, the most important solution is to thoroughly assess the site’s potential, as well as perform demand studies that evaluate not only the current power demand, but that also forecast future power consumption. Analyzing both the supply and demand sides, it is possible to optimize the SHP plant capacity and to develop the project feasibly, in case the project is, of course, feasible. Nonetheless, as stated before, the site’s limited potential may not be a constraint if the demand is low. [15] 4. Hydropower is paid upfront and there may exist several constraints beforehand. Similarly to solar and wind energy, the initial investment in a SHP plant is what contributes the most for the total cost. Several mechanisms can stimulate the investment in SHP, such as national government’s support programs, or access to grants and concessional financing from international organizations and development partners, in order to assist local communities with higher initial cost projects. A fresh look at the policies might assist in overcoming barriers for the development of SHP projects, considering not only the financing mechanisms, tariffs and subsidies, but also the sector’s regulation and its whole legal framework, concerning concessions and permit acquisition, among others. To further improve the effectiveness of such projects, a strong central planning is required, with an efficient integration of power generation and transmission planning at regional and national levels, so as to identify clearly institutional responsibilities and to allocate adequate resources. [11], [13] 5. SHP plants have negative impacts on the environment and local communities. The definition of proper mitigation strategies for environmental and social impacts of SHP plants begins with studies and assessments, with clear and minimum requirements established for such evaluations. For example, the assessment of social impacts is, in general, limited to a vague description, where affected populations are not adequately identified or quantified. As such, a strong environmental and social framework in needed to ensure the sustainable development of hydropower through quality studies and consultation processes with adequate budgeting. Finally, the integration of SHP plants with existing infrastructures, or its development aligned with the interests of the local communities such as water pumping and irrigation, are effective ways to reduce the impacts both on the environment and on the local population. [12], [13] 45 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 4 UPDATED LIST OF ALREADY IDENTIFIED POTENTIAL FOR SMALL HYDROPOWER 4.1 CONTEXT The following chapter presents the update of the list of already identified potential for SHP in NTT, Maluku, Maluku Utara, and Sulawesi. The original list is taken from the comprehensive list of projects identified for the national map (presented in the accompanying Small Hydropower Mapping Report), mostly collected in central authorities and major stakeholders in Jakarta, and was complemented by site visits to all major wilayahs in the in NTT, Maluku, Maluku Utara, and Sulawesi regions to find local knowledge and interests from private investors. 4.2 LIST OF PROJECTS FROM THE NATIONAL MAP The collection of SHP data was the most important and challenging assignment of Activity 1. The SHP data was gathered from the RUPTL 2013-2022, Hydro Inventory Study – 1997, IPP’s requests, PLN’s own feasibility studies and from the Consultant’s own internal knowledge SHP database with almost 2700 projects identified in total. The data collection assignment is reported in detail on the accompanying Small Hydropower Mapping Report. In brief, the projects were collected from RUPTL, Hydro Inventory Study from 1997, IPP and PLN Feasibility Studies, PLN New and Renewable Energy Department and the Consultant’s own internal knowledge SHP database. In order to merge those lists while removing duplicates it was necessary to have especial attention to projects with different characteristics on the same location. On those cases if the overall project characteristics were too different, mainly the output power, it was decided to keep both projects in the same location given that they should have different schemes for the same location. [16] [17] After a thorough analysis it was possible to eliminate approximately 700 duplicate projects while merging projects, resulting on a final comprehensive compilation list of 2000 entries. It should be stressed that 33 of those projects are located in East-Timor, former Indonesian territory that has gained independence as sovereign nation since the initial Hydropower Master Plan of 1997. Those projects were gathered from PLN’s archives and for that reason were kept on the database, but will be excluded of any further analysis. Also, 4 projects don’t have information regarding the installed capacity, which is essential for any basic analysis. On the other hand, from the remaining 1963 projects, 176 were not possible to locate geographically (just stating the province where they are located). Although all 1963 projects were analyzed, these 176 46 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT projects were not included on the maps of findings of the next subchapter for not having the necessary coordinates. The compiled data corresponds to a total of 88 GW between 1963 hydropower projects. Table 4.1 and Figure 4.1 present the distribution of the hydropower projects per island and wilayah. GW 100 90 1 1 9 0 0 1 1 1 1 88 6 80 4 14 0 10 70 11 17 60 1 6 50 23 23 40 30 5 23 20 5 1 8 0 3 10 1 - SUMATERA MALUKU TENGAGARA PAPUA KALIMANTAN JAWA WRKR DISJABAR WILNTT WILNTB WILMMU GRAND TOTAL WILACEH WILSUMBAR SUMATERA WILBABEL WILSUMUT WILPPB WILKALTIMRA KALIMANTAN SULAWESI DISBALI WS2JB DISJATIM MALUKU WILKALBAR WILKALSELTENG DISBANTEN TENGGARA DISLAMPUNG WILSULSELRABAR WILSULUTTENGGO DISJATENG SULAWESI NUSA NUSA Figure 4.1 – Distribution of hydropower projects per Island and Wilayah. Table 4.1 – Distribution of the hydropower projects per Island and Wilayah. WILAYAH NUMBER OF PROJECTS TOTAL CAPACITY (MW) Jawa 329 8 608 DISBANTEN 23 262 DISJABAR 133 6 259 DISJATENG 107 1 406 DISJATIM 66 681 Kalimantan 191 17 194 WILKALBAR 94 5 836 WILKALSELTENG 28 540 WILKALTIMRA 69 10 817 Maluku 65 835 WILMMU 65 835 Nusa Tenggara 152 988 DISBALI 22 111 WILNTB 36 156 WILNTT 94 720 47 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT WILAYAH NUMBER OF PROJECTS TOTAL CAPACITY (MW) Papua 241 23 315 WILPPB 241 23 315 Sulawesi 328 13 794 WILSULSELRABAR 177 9 788 WILSULUTTENGGO 151 4 005 Sumatera 657 23 426 DISLAMPUNG 33 776 WILACEH 179 7 894 WILBABEL 2 1 WILSUMBAR 120 3 221 WILSUMUT 180 5 373 WRKR 12 980 WS2JB 131 5 181 Grand Total 1 963 88 160 It can be seen that this database includes not only SHP but also Large Hydro Projects (LHP), since in average the projects on the database have more than 40 MW. This wasn’t considered fully inhibiting at the outset since even a hydropower project that was initially thought as LHP may in some cases be downsized to SHP. However, caution is advised, since it may not be feasible to install power capacity far from the optimal design (since the energy costs might be too high). Even so, less than 1000 projects on the database are SHP with a total capacity of 4 GW, while LHP reaches 84 GW, Figure 4.2. 48 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT GW 100 SHP - Acumulated Capacity (GW) 90 LHP - Acumulated Capacity (GW) 80 SHP - Number of projects 70 60 LHP - Number of projects 937 50 40 257 30 400 96 50 188 241 20 2 84 43 43 40 91 97 140 1 026 53 70 88 128 19 2 35 198 198 15 16 9 151 86 90 84 77 10 126 0 54 15 52 20 31 40 40 14 96 79 12 60 8 43 23 14 17 24 25 25 10 2 5 - KALIMANTAN JAWA SUMATERA SULAWESI WILACEH WRKR PAPUA WILNTT WILNTB WILMMU GRAND TOTAL WILBABEL WILSUMBAR DISJABAR WILSUMUT WILPPB WILKALTIMRA KALIMANTAN DISBALI MALUKU WS2JB WILKALSELTENG DISBANTEN DISJATIM WILKALBAR TENGGARA DISLAMPUNG WILSULSELRABAR WILSULUTTENGGO DISJATENG PAPUA MALUKU NUSA TENGGARA NUSA Figure 4.2 – Distribution of Large (LHP) and Small (SHP) hydro per Island and Wilayah. Proceeding with the SHP analysis, it should be stressed that more than half of SHP are located on Sumatera or Jawa Islands with almost 500 projects and a total capacity of more than 2 GW. In terms of average capacity, Sumatera and Kalimantan have the highest capacity per SHP with more than 5 MW. Given the type of feed-in-tariff (FiT) implemented by the Government it was expected the collection of more projects near the 10 MW limit, but since that’s not the case, it is possible that the majority of the gathered SHP are designed considering the optimal solution in terms of Cost/Production. Sumatera Island does not only presents the highest number of projects and average capacity per SHP, as also naturally presents the highest total capacity with more than 1.3 GW. All this analysis can be easily seen in Figure 4.3 and Table 4.2. 49 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT GW 5 4 0.2 0.2 4.0 0.3 0.4 0.1 0.2 0.9 0.1 0.2 3 0.4 0.1 0.4 0.8 0.4 2 0.1 0.0 0.2 0.2 0.2 0.1 0.2 1.3 0.6 0.0 1 0.3 0.0 0.2 0.1 - WRKR PAPUA WILNTB WILMMU WILACEH WILBABEL DISJABAR WILSUMUT SUMATERA JAWA DISBALI WILNTT WILSUMBAR WILKALTIMRA KALIMANTAN SULAWESI TOTAL WILPPB DISBANTEN MALUKU WILKALBAR WILKALSELTENG DISLAMPUNG WS2JB WILSULSELRABAR DISJATIM KALIMANTAN DISJATENG TENGGARA WILSULUTTENGGO PAPUA MALUKU TENGAGARA JAWA SULAWESI GRAND TOTAL GRAND NUSA NUSA Figure 4.3 – Distribution of SHP per Island and Wilayah. Table 4.2 – Distribution of SHP per Island and Wilayah. WILAYAH NUMBER OF PROJECTS TOTAL CAPACITY (MW) Jawa 241 890 DISBANTEN 15 78 DISJABAR 90 363 DISJATENG 84 233 DISJATIM 52 216 Kalimantan 40 199 WILKALBAR 15 59 WILKALSELTENG 16 92 WILKALTIMRA 9 48 Maluku 40 198 WILMMU 40 198 Nusa Tenggara 128 387 DISBALI 20 69 WILNTB 31 58 WILNTT 77 260 Papua 43 168 WILPPB 43 168 Sulawesi 188 803 WILSULSELRABAR 91 409 WILSULUTTENGGO 97 394 Sumatera 257 1 314 50 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT WILAYAH NUMBER OF PROJECTS TOTAL CAPACITY (MW) DISLAMPUNG 19 60 WILACEH 53 269 WILBABEL 2 1 WILSUMBAR 50 240 WILSUMUT 96 557 WRKR 2 18 WS2JB 35 169 Grand Total 937 3 959 Still on SHP, there are a large number of entries without any information regarding the status of the project and even if they had it, they could just be outdated. For instance 85% of the projects don’t have such data, corresponding to more than 3 GW, Table 4.3. Project’s developer information suffers from a similar situation as more than 40% of SHP don´t have indication of even the developer’s type (IPP or PLN), Table 4.4. Even so, from the identified 386 SHP under IPP responsibility it was possible to collect in 250 of them the name of the company in charge. The SHP IPP’s request list by island is presented in the accompanying Small Hydropower Mapping Report, with indication of the project’s capacity and status. Table 4.3 – Indonesian SHP status. STATUS NUMBER OF PROJECTS TOTAL CAPACITY (MW) Completed 83 285 PPA 6 37 Under Construction 51 271 Unknown 797 3 366 Grand Total 937 3 959 Table 4.4 – Indonesian SHP developer’s categories. DEVELOPER NUMBER OF PROJECTS TOTAL CAPACITY (MW) IPP 386 1 675 PLN 157 249 Unknown 394 2 035 Grand Total 937 3 959 While it is comprehensive for the type of developer to be unknown at a study level, since it may be unspecified at that stage, the unknown status of a project should naturally correspond to some study level, although this is not certain - especially since some sources were databases that may not be up-to- date. Finally, bearing in mind PLN’s past SHP strategy it was expected for the vast majority of SHP in the database to be developed by IPPs. This strategy is now changing considering the high power demand of 51 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT some Indonesian regions where the generation cost is still very high. For that reason, PLN wants to boost renewable generation projects implementation by developing SHP themselves. As stated, this is PLN’s recent approach and this database is based on pa st studies and may not represent this scenario. Figure 4.4 presents the total capacity per Island and identified developer, where it is easily seen that IPP still are the main actors on the SHP market, but there is still a lot of identified potential with undefined developer. Figure 4.4 – Total capacity (MW) per Island and identified developer. 52 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 4.3 SITE VISITS TO MAJOR WILAYAHS As part of the review and validation of SHP potential in NTT, Maluku, Maluku Utara, and Sulawesi the Consultant performed site visits to all major wilayahs to gather more SHP projects and to find local knowledge and interests from private investors. This mission was accomplished with strong coordination between the Consultant and PLN’s Pusat and Wilayah staff. This study area comprises the following PLN’s regional divisions, which were visited in March 2016: 1. Wilayah Maluku dan Maluku Utara (based in Ambon, Maluku); 2. Wilayah Nusa Tenggara Timur (based in Kupang, Timur); 3. Wilayah Sulawesi Selatan, Sulawesi Tenggara dan Sulawesi Barat (based in Makassar, Sulawesi); 4. Wilayah Sulawesi Utara, Sulawesi Tengah dan Gorontalo (based in Manado, Sulawesi). From the regional offices it was possible to identify 48 new projects from IPP’s requests and 6 from PLN studies. This represents an additional 256 MW to study in a total of 54 new projects, as presented in Table 4.5. Table 4.5 – Identified new SHP potential from PLN Wilayahs. New SHP PLN Wilayah Number Potential (MW) Wilayah Maluku dan Maluku Utara 2 14 Wilayah Nusa Tenggara Timur 12 8 Wilayah Sulawesi Selatan, Sulawesi Tenggara dan Sulawesi 20 127 Barat Wilayah Sulawesi Utara, Sulawesi Tengah dan Gorontalo 20 107 Total 54 256 Besides PLN’s regional offices, the Consultant also made an effort to visit local government offices to find local knowledge and compile information on principle licenses for hydropower. Nonetheless, this assignment was more complex and less productive than originally expected, since a recent change in legislation altered the SHP licensing process (as described in section 3.2.2) and as such local offices couldn’t provide helpful contributions. In one occasion, for instance, during a visit to the local authorities in Minahasa’s Regency (Sulawesi Utara), the Consultant was informed by both the local offices of the Ministry of Energy and Mineral Resources (MEMR) and the Integrated Licensing Services (KPPT) that the regional offices are still adjusting to the new legislation and that for the moment it’s not entirely clear who is in charge of what on the principle licensing. For this reason the local government offices often directed the Consultant to PLN wilayahs and were not able to provide relevant information. Additionally, the sheer number and dispersion of different local offices throughout the focus region is so significant that a comprehensive collection of data would be too complex for the project timeframe and budget. 53 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Additionally, the Consultant carried out sample site visits to assess local conditions of the study area and to calibrate design assumptions and details (presented in the next chapter). Figure 4.5 demonstrates some of the different conditions for SHP that could be found. For instance, Sulawesi (photos a and b) naturally presents more potential especially given the weather conditions, more rainy, and the size of the catchment areas. On the other hand in Maluku, Maluku Utara and NTT (photos c and d) the weather is drier, with tropical rain, and considering the size of the islands, as one should expect, the average catchment areas are must smaller. This doesn’t mean there is no potential on those islands, just that torrential streams and water shortage in few months should be expected. This situation is well illustrated on the dry river visit in Ambon Island presented in Figure 4.5 (photo c). Finally, on Figure 4.5 (photo d) is possible to observe yet another possibility, the rehabilitation of an existing hydropower. In this particular case in NTT, the micro-hydro is out of commission and has good potential for rehabilitation or even to boost the previous installed capacity. All this should be carefully studied taking also into consideration the local demand, grid connection cost and social and environmental impacts. Figure 4.5 – Site visits in: a) Minraleng-2 project site, Sulawesi Selatan; b) PLTM Tincep 2 project site, Sulawesi Utara; c) Halo project site, Ambon, Maluku; and d) PLTMH Oehala micro-hydro project, Kupang, Timur. 54 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 4.4 RESULTS Based on what was presented above, the list of already identified potential for SHP in NTT, Maluku, Maluku Utara, and Sulawesi was updated merging the entries from these regions on the original list taken from the comprehensive collection of projects identified for the national map (presented in the accompanying Small Hydropower Mapping Report), and the new data collected during site visits to all major wilayahs in the focus area (in a total of 54). This resulted on a list with a total of 433 entries located in the focus area 1, as presented in Table 4.6. Also included on the previous table is the initial estimate of projects in each region given as reference to the Consultant at the beginning of the present assignment2. As a measure of the effort deployed by the Consultant in data collection, it is worth highlighting the considerable increase in number of projects in all the regions, especially in Maluku and Maluku Utara (three-fold) and in Sulawesi (nearly ten-fold). Table 4.6 – Identified SHP potential on the study area. Initial number Number of Potential PLN Wilayah of estimated projects (MW) projects Wilayah Maluku dan Maluku Utara 29 60 760 3 Wilayah Nusa Tenggara Timur (NTT) 64 86 690 Wilayah Sulawesi Selatan, Sulawesi Tenggara dan Sulawesi Barat 156 9 050 31 Wilayah Sulawesi Utara, Sulawesi Tengah dan Gorontalo 131 3 925 Total 157 433 14 426 The updated list of identified potential in NTT, Maluku, Maluku Utara and Sulawesi is presented in Annex I. 1 The original resulting list has 490 projects on the focus area. However, 57 projects lack geographic coordinates and couldn’t be correctly located and were therefore excluded from the proceeding analysis. 2 From the selection process Terms of Reference: “ the 1997 Hydropower Master Plan lists 31 sites in Sulawesi, 29 sites in Maluku, and 97 sites in NTT with estimated capacity below 10 MW.” 3 The original reference states 97 projects in NTT, but 33 of those projects are located in East-Timor, former Indonesian territory that has gained independence as sovereign nation since the initial Hydropower Master Plan of 1997, thus the revised figure on the table. 55 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 5 REVIEW AND PRIORITIZATION OF SMALL HYDROPOWER POTENTIAL 5.1 CONTEXT Following the updated list of identified potential in NTT, Maluku, Maluku Utara and Sulawesi derived on the previous chapter (and presented in Annex I), a review and prioritization of the SHP potential in the study area was conducted, with the final goal of listing the most promising SHP to be developed in these provinces to support electrification. The process for review and prioritization of the SHP potential and the ensuing results are the focus of the present chapter. The proposed methodology for this task included step-wise validation through gradual screening of information as the review becomes more advanced. This analysis took into account several factors such as hydrology, grid connection, environmental and social issues, as well the financial parameters resultant of the costs evaluation. Lastly, recommendations for further preparation studies, investigation and monitoring to support the development of the prioritized schemes are made and the latest resulting data was updated to the national GIS database on SHP potential. 5.2 ANALYSIS OF EXISTING DATA As mentioned before the list of the identified potential in NTT, Maluku, Maluku Utara and Sulawesi includes 433 project sites. This list is organized in a data base, which includes the main characteristics of each project. The number of hydropower sites in the list of identified potential, regarding the location and anticipated installed capacity, is depicted in Table 5.1 and Figure 5.1. Table 5.1 – Hydropower capacity per region. List of identified potential. Region Total Projects ≤1 MW 1 < Cap. ≤ 10 MW >10 MW No MW info NTT 86 (20%) 16 51 18 1 Maluku 38 (9%) 3 16 19 - Maluku Utara 22 (5%) 1 15 6 - Sulawesi 287 (66%) 8 144 133 2 Total 433 28 (6%) 226 (52%) 176 (40%) 3 (1%) 56 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 5.1 – Hydropower capacity per region. List of identified potential. Due to the size of the Sulawesi territory, the majority of the sites are situated in this island, followed by NTT. Only 14% of the sites are situated in Maluku and Maluku Utara Islands. Almost 60% of the sites presented in this list are expected to be SHP plants (capacity up to 10 MW). Some of the information presented in the database associated with the list of identified potential is based on pre-feasibility and feasibility studies (18% of 433 projects), but most of the planned sites are map or investigation studies (64% of 433 projects). The study level of the remaining projects is unknown. The diversity in the underlying study level makes the information in the database to have different levels of detail. This particularity makes project comparison difficult. Some projects have substantial information regarding the characteristics of the hydraulic circuits, like dimension and lengths, which can only be compared with other projects with similar information. In order to review the unitary costs of investment, the Consultant analyzed the installed capacity versus investment cost present in the data base of the list of identified potential. The result is presented in Figure 5.2. 57 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 5.2 – Installed capacity (<10 MW) vs. investment cost in the list of identified potential. From the data analysis it is evident that there is no meaningful correlation between the two variables. This may be partially explained by the different currency (RP and USD) in the original data and the exchange ratio used when calculating the investments costs, the different dates of each estimate and the type of scheme. In terms of hydrological characteristics, about 75% of the sites in the list of identified potential have annual rainfall information, 79% presented average runoff data and 85% indicated catchment area. A quick analysis of this data revealed that only 1% of the project has a runoff greater than the rainfall and 72% otherwise. The remaining 114 project entries do not have enough information to reach a conclusion. Although there are a large number of projects with annual rainfall information, when comparing this data with the Atlas Rainfall of Indonesia, the Consultant concludes that some of the original rainfall data may not be reliable. After georeferencing the project site in SRTM maps V1 and V4.1 [18], satellite imagery maps obtained from Google Earth and OpenStreet maps [19], the Consultant confirmed that only 25% of the database site coordinates were located at a distance inferior to 100 m from the probable correct site. Regarding elevation and catchment areas, it was also noted that some original information lacked accuracy. 58 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 5.3 DEMAND Energy demand on the study area is essential for prioritization of the projects and the analysis of isolated grid systems (off-grid). This data should be an input from the parallel contract of Geospatial Electrification Planning 4. However, it was noted that the Sulawesi island assessment was not included on the parallel contract, hence the Consultant only received the NTT, Maluku and Maluku Utara 2025’s local demand forecast, consisting on a demographic growth forecast and annual energy demand for the target year of 2025 at village level. This information was given in both GIS and table formats. To overcome this data gap in Sulawesi Island, the Consultant had itself to develop the demand forecast for district level since it wasn’t possible to collect GIS data at village level. The determination of the 2025 Sulawesi’s demand considered the 2010 National Census results and PLN’s RUPTL and Sta tistics Reports. From the 2010 National Census the average annual population growth rate forecast for 2010-2014 and the 2010 district population and number of households were used. For this study’s purpose the provincial annual population growth rate determined on the Census for the period of 2010-2025 was extended. This allowed the determination of the 2025 population by district. [20] Secondly, the same inhabitants per household at district level as indicated on the Census were considered for the determinations of the number of households per district. [20] Based on the household demand reported on PLN’s Statists, Table 6.3, the 2025 district demand was determined. [4] Table 5.2 – Province Statistics. [4] [20] Annual Population Household demand Province Growth Rate (kwh/year) Sulawesi Utara 1.17% 1373 Sulawesi Tengah 1.71% 1132 Sulawesi Selatan 1.13% 1391 Sulawesi Tenggara 2.20% 1385 Gorontalo 1.65% 1326 Sulawesi Barat 1.95% 1070 4 In accordance with the Small Hydropower Mapping and Improved Geospatial Electrification Planning in Indonesia Technical Assistance Terms of Reference 59 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Finally, for the SHP review for isolated grid systems it was also necessary the peak demand for Sulawesi, NTT, Maluku and Maluku Utara regions. In order to determine the 2025 peak demand from the annual energy demand already determined the 2025 province load factor given by the RUPTL 2016-2025 energy consumption and peak demand forecasts was used, Table 5.3. [5] The demand forecast results are presented in Annex II. Table 5.3 – Province load demand forecast. [5] Energy Consumption Peak Demand Province Load Factor (GWh) (MW) Sulawesi Utara 3518 643 5471 Sulawesi Tengah 2146 437 4911 Sulawesi Selatan 13210 2527 5228 Sulawesi Tenggara 3769 736 5121 Gorontalo 1086 204 5324 Sulawesi Barat 599 134 4470 Nusa Tenggara Timur 1877 405 4635 Maluku 1507 285 5288 Maluku Utara 948 191 4963 5.4 METHODOLOGY 5.4.1 REVIEW PROCESS The original methodology proposed in the inception report for the prioritization process is shown in Figure 5.3. 60 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 5.3 - Proposed workflow of SHP prioritizing process. The first phase (Phase 1) of the screening consisted on a filtering to exclude any SHP projects that are already constructed or under construction, or with execution plans under development. Projects for which the exact locations (coordinates) were not retrieved were also excluded. The subsequent phase consisted on the selection of sites through a multi-criteria analysis followed by one by one analysis. Finally, in Phase 3, the final prioritization was aimed to be the result of a strategic analysis consisting of each project evaluation within the defined criteria for major strategic options. As the Consultant started the analysis, some challenges arose that forced the Consultant to make changes in the initially proposed methodology. Firstly, the number of projects without coordinates or with wrong locations was so significant that compelled the Consultant to adjust the exclusion criteria. The only option available was to attempt the relocation of the projects to a more realistic position, according to some characteristics, like river name, watershed area or elevation. Secondly, the majority of the information in the database to be used in the multi-criteria analysis was insufficient or lacking reliably, as previously explained. Hence, in order to achieve the proposed objectives, the Consultant decided to review the methodology, Figure 5.4. 61 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 5.4 - Final Workflow of SHP prioritizing process. The main difference from the original methodology is the preliminary analysis (similar to a pre-feasibility study) of all the projects selected after the screening process. With this study it was possible to assure that all sites were given equal treatment and was possible to compare each one. After this preliminary analysis it was possible to apply a multi-criteria inquiry in order to prioritize the sites. The screening process was also subject to review. In order to not exclude projects only by the lack of exact coordinates, the Consultant attempted to relocate project sites that, by some unknown reason, were not in a realistic location. 5.4.2 SCREENING STAGE 5.4.2.1 OVERVIEW The objective of this stage is the screening of the sites and subsequently the selection of the projects for the analysis stage. The screening stage is divided in four phases as presented in Figure 5.4. Figure 5.5 - Workflow for the screening stage. 62 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 5.4.2.2 PHASE 1 Phase 1 consists on the exclusion of the already built, under construction or in advanced stage of development (Power Purchase Agreement), according to the information available in the database of the list of identified potential. The screening on this phase excluded 48 projects of the initial 433. Table 5.4 presents the location and motive of exclusion. Table 5.4 – Number of excluded projects in Phase 1 by region. Phase 1 Under Region Already built PPA Excluded construction NTT 3 3 - - Maluku 1 - 1 - Maluku Utara - - - - Sulawesi 44 30 9 5 Total 48 33 10 5 5.4.2.3 PHASE 2 After georeferencing the remaining 386 sites projects in satellite imagery maps obtained from Google Earth, it was possible to verify their physical existence, overlapping with other schemes and repetition of sites. Phase 2 comprises the exclusion of the projects based on the referred criteria. The screening on this phase excluded 70 projects of the 385 remaining project entries. Table 5.5 summarizes the location and motive of exclusion. Table 5.5 – Number of excluded project in Phase 2 by region. Overlapping Phase 2 Repeated Region Not found existing Excluded sites schemes NTT 19 4 12 3 Maluku 5 1 - 4 Maluku Utara 3 3 - - Sulawesi 43 12 23 8 Total 70 20 35 15 5.4.2.4 PHASE 3 The key objective of this study is the determination of the list of most promising SHP sites. In order to achieve this goal, the Consultant decided to discard the entire non-SHP projects. Although the considered limit for SHP is 10 MW installed capacity, the Consultant decided to include all projects with planned installed capacity below 12.5 MW, that is to say, to provide a 25% adjustment margin. The 63 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT purpose of this extension in the upper limit of SHP is not to discard any project that after the analysis stage could become a SHP. The screening on this phase excluded 130 projects of the 315 remaining projects. Table 5.6 presents the location and number of sites according to their capacity. Table 5.6 – Number of excluded project in Phase 3 by region. Installed capacity Installed capacity Region ≤12,5 MW >12,5 MW NTT 53 11 Maluku 20 12 Maluku Utara 15 4 Sulawesi 97 103 Total 185 130 5.4.2.5 PHASE 4 The final phase of the screening stage consists in the exclusion of projects based on the quality of the site identification. As previously described, the identification of the sites in some cases was performed based on catchment area, elevation and river name. The site identification quality was defined by the ratio between the revised catchment area and original catchment area value. It was deemed a poor quality site identification where the ratio was superior to 25% and the site was subsequently excluded from the selection. The catchments areas were automatically generated via QuantumGIS software using the SRTM maps V1 and V4.1. [18] The screening on this phase excluded 18 projects of the 185 remaining projects. Table 5.7 presents the location and number of excluded projects. Table 5.7 – Number of excluded projects in Phase 4 by region. Incorrect Region area NTT 2 Maluku 3 Maluku Utara 4 Sulawesi 9 Total 18 5.4.2.6 SCREENING STAGE RESULTS The number of hydropower sites selected projects for the following analysis stage, regarding the location and installed capacity, is presented in Table 5.8 and Figure 5.6. 64 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Table 5.8 – Hydropower capacity per region. Final screening phase. Region Total Projects ≤1 MW 1 < Cap. ≤ 10 MW 10 < Cap. ≤ 12,5 MW No MW info NTT 51 (31%) 9 39 2 1 Maluku 17 (10%) 2 12 3 - Maluku Utara 11 (7%) - 10 1 - Sulawesi 88 (52%) 6 75 5 2 Total 167 17 (10%) 136 (81%) 11 (7%) 3 (2%) Figure 5.6 – Hydropower capacity per region. Final screening phase. The number of selected projects is 167, which corresponds to 39% of the total projects in the list of identified potential. As expected, the majority of the project sites are located in Sulawesi, followed by NTT. 5.4.3 ANALYSIS STAGE 5.4.3.1 OVERVIEW The objective of this stage is the preliminary assessment of the selected project sites and subsequent preliminary design of the hydropower schemes. The results of the preliminary site assessment will form 65 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT the basis of the prioritization and final stage. The analysis stage comprises four phases, as shown in Figure 5.7. Figure 5.7 - Workflow for the analysis stage. 5.4.3.2 PHASE 5 This first phase of the analysis stage consists in the definition of the hydropower scheme for each selected project. Hydropower plants can be broadly classified in three different categories according to operation type.  Run-off-river;  Hydropower plant with reservoir (storage);  Pumped storage hydropower plant. Run-of-river Plants (Figure 5.8) are generally used in rivers where there is a natural elevation drop. If there is enough flow, the difference in elevation can be a good source of electricity. This type of scheme does not require significant water storage. Instead, the water is diverted from the river and channeled along a waterway into a headpond. The diversion is usually possible through the construction of a weir and an intake. The water is then channeled in the headrace toward the headpond. The headrace can be an open channel, a pipe or a tunnel. The headpond objective is to provide a steady level and the appropriate submergence conditions of the penstock entrance before the flow is conveyed to the power house. 66 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 5.8 – Run-of-river plant example [21]. Power generation in run-of-river plants is ruled by the river flow conditions and thus heavily depends on precipitation and runoff (and snowmelt, in some regions). This type of scheme may have substantial daily, monthly or seasonal variations. Because of the minor dimensions of the weir and relatively small construction works, the option for run-of-river plants usually avoids larger environmental impacts. Hydropower plants with upstream reservoir (Figure 5.9) typically comprise the construction of a dam to store the water. The power house is often located at the dam toe. Figure 5.9 – Hydropower plant with reservoir example [21]. The storage capacity allows a better management of the flow and therefore the power generation is more stable and less variable than for run-of-river plants. This type of hydropower scheme can have major environmental and social impacts due to the flooding of land for the reservoir. 67 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT In Pumped Storage Hydropower Plants water is pumped from a lower reservoir into an upper one, usually during off-peak hours, while flow direction is reversed to generate electricity during the daily peak load period or at other times of need. This type of scheme is not common in SHP plants. In the definition of the scheme for the selected projects, the Consultant attempted to reach the best option regarding the local topographic conditions. This analysis was possible using the available cartography (1:25 000 and 1: 50 000), obtained from the office of Surveying and Mapping Coordinating Agency (Bakosurtanal) in Cibinong, Bogor Regency. The maps include contour lines elevation, land use, roads, rivers, toponyms, buildings and topographical features. In addition to these maps, the CONSULTANT also resorted to digital terrain model SRTM maps V1 and V4.1 [18], and satellite imagery maps obtained from Google Earth. At this, stage the Consultant proceeded with the preliminary design of the schemes based on the following main criteria. 1. Determining location of the headpond One of the civil structure components that is most decisive in SHP plants is the headpond. The location of the headpond is crucial to establish the gross head. Generally, the headpond structure is often the second most expensive building after the headrace and the most decisive for head in SHP. So, it needs special attention and should be placed on flat area and avoid steep areas which may be prone to landslides. 2. Determining location of weir and headrace Weirs can be defined as the waterworks that allow the water to be properly diverted to the intake. The location of the weir shall consider the following aspects:  Topography a) Located on straight river stretch and at a narrow section; b) If there is no straight stretch in the river at the desired area, then it can be placed in a smooth river curve, but the position of intake shall be on the outside of the curve; c) When the headpond elevation is set due to terrain topographical restrictions, then the elevation of the weir can be determined accordingly; d) Weir/dam height shall not be high; e) Accessibility and service levels; f) Waterway channel can be placed in suitable terrain.  Hydrology a) Hydrological factors will influence height, width and length of the weir that are dependent on the flood design discharge. 68 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT To determine the waterway type, it is assumed that the waterway uses open channels whenever possible (lower cost) and syphons on the channel part that crosses tributaries, as well as in areas that are considered prone to landslides. 3. Determining the location of the powerhouse and tail water level The powerhouse functions as a shelter of the mechanical and electrical equipment that are required for power generation. Mechanical-electrical equipment shall be indoor, adequately protected from adverse weather conditions. The location for the powerhouse should ideally be on a flat area below the headpond site and safe from flooding. Generally, in preliminary assessment the power house location is placed at elevation 1 or 2 m above the estimated water surface of the river in flood conditions. 4. Determining the access road In order to allow the erection, operation, inspection and maintenance operations, all building sites of SHP should be accessible. Accessed shall be granted with a four-wheel vehicle, two-wheel vehicle or by foot. However, to facilitate maintenance work, it is recommended that 4-wheel vehicles can access certain parts that need heavy equipment. The access ways that are used in daily operations can be asphalt roads, while others inspection paths can use macadam pavement or ground. The access road must be connected to the nearest existing road. The alignment and profile of the access road should follow the common rules of design. 5. Determining the Transmission Line On determining the capacity and length of the transmission lines for preliminary assessment, the Consultant assumes that the transmission lines are connected to the nearest village to the SHP location that has a 20 kV network. The length of the transmission line is therefore based on the distance between powerhouse location and the nearest village. 5.4.3.3 PHASE 6 This phase concerns the exclusion of projects with unsatisfactory design parameters. Even after the screening procedure previously described an implemented it is possible that some projects could not present favorable design parameters. Based on the Consultant’s experience, SHP sites with a head minor than 20 m, catchment areas below 10 km 2 and with headraces lengths greater than 10 km are most likely economically unfeasible. The referred analysis excluded 12 projects of the 167 analyzed. Table 5.9 presents the location and number of considered projects for the list of most promising sites. 69 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Table 5.9 – Number of projects considered for the list of most promising sites per region. Region Total Projects NTT 50 (32%) Maluku 14 (9%) Maluku Utara 7 (5%) Sulawesi 84 (54%) Total 155 5.4.3.4 PHASE 7 The following step (Phase 7) consists on the hydrological characterization of all the selected projects. This characterization is based on the catchment areas defined in the Screening Stage, the information of the Atlas Rainfall of Indonesia (published by Survey and Mapping Coordinating Agency in collaboration with Meteorology and Geophysics Agency), and Forest/Non-forest maps modeled from ALOS -published by Earth Observation Research Center, Japan Aerospace Exploration Agency (JAXA) with a resolution of 50 m. In order to estimate the flow availability for each project, a flow-duration curve was calculated. The flow-duration curve is a representation of the average flow regime at a given river section. This curve is obtained by sorting the records in decreasing order with the same period of the flow along the dataset. The result is a curve showing the percentage of time that a given flow value is equaled or exceeded. Determination of a flow-duration curve requires adequate records of river flow, ideally daily. The flow-duration curve has been used for a long time as a tool to ascertain the hydrologic response of a watershed. Lately, the flow-duration curve has been used to validate the output of hydrological models, or compare the hydrologic response of output flows of a model with the observed flow, as done by Hansen et al (1996) and Ye et al (1997). Recent research developments show that the flow-duration curve is a hydrologic "signature" of a watershed, which reflects its hydrological characteristics. The hydrological characteristics have been used in the modeling approach to determine the appropriate level of complexity required in the rainfall- runoff models (Jothityangkoon et al, 2001). It was hypothesized that hydrological characteristics may reflect the nature of watersheds, and therefore can be used in the study of regional water resources potential. For instance, Yu et al (2002) have implemented a regionalization procedure to predict the proportion of low flow from the flow duration curve at locations where there is no record of flow in southern Taiwan. 70 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 5.10 – Flow duration curve example. In a relatively homogeneous area, flow duration curves can be approximated in a simple way to correlate with the watershed area. Yu and Yang (2000) demonstrated this in the homogeneous watershed of Gao-Ping tributaries in southern Taiwan. However, in order to regionalize the flow duration curve for more heterogeneous regions, other watershed parameters need to be considered (David A Post, 2004). There are many alternatives in the flow duration curve parameterization which are published in the literature. For example, Cigizoglu and Bayazit (2000) has modeled using 5 harmonic parameters and concluded that the parameters can be simplified into 2 or 3 parameters. Best et al (2003) have conducted three studies using different parameters and concluded that models with 5 parameters give quite suitable results to examine the effects of land use changes. According to Best et al (2003), the flow-duration curve can be approximated by an equation of normalized flows, where the flows are divided by the median of the stream flow that is not zero. This is done so that the logarithmic of normalized flows intersect the axes at the median flow. 1. 2 parameter equations  aF1   x    y  10  CTF   P   50 , x ≤ CTF   y = 0, x ≥ CTF 2. 3 parameter equations  b1 F1   x    y  10  CTF   P   50 , x ≤ CTF/2   71 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT  b2 F1   x    y  10  CTF   P   50 , CTF/2 ≤ x ≤ CTF   y = 0, x ≥ CTF 3. 5 parameter equations  a c exp   1  x   a  F  CTF  c1    c1   y  10 1      P , x ≤ CTF/2   50    a c exp   1  x   a  F  CTF  c2    c2   y  10 2      P , CTF/2 ≤ x ≤ CTF   50   y = 0, x ≥ CTF In the above equations, y is the predicted flow, F-1 is the inverse of the standard normal cumulative distribution, P50 is the median of the non-zero flow days, CTF is the cease to flow point (expressed as a percentage), x is the probability value (0-100%) and a, b1, b2, c1, c2 are curve-fitting parameters. The annual rainfall was estimated based on the information presented in the Atlas Rainfall of Indonesia. In the case of regional flow data limitations, the equation that requires more parameters will have difficulty in obtaining them. As has been done by David A Post (2004) to obtain regional the flow- duration curve within watersheds in the Burdekin River catchment, a normalized flow curve equation can be expressed in a different form, as follows: a  ln  1  y  x  b where y - ln (normalized flow); x - percentage of exceeded flows; a - perennial factor, the percentage of exceeded flows of non-zero flows; b - retention constant, a constant that represents the slope of the flow-duration curve. The perennial factor a shows the ratio of non-zero flow period and the entire period as a percentage, so if 90% of the time flows in a river are available, then the value of a is 90. When flows in a river are available all the time, then the value of a is 100. Retention constant b is obtained by matching (fitting) curves with a river flow-duration curve that has good flow records. This value indicates the watershed retention ability in responding to the rainfall. Low b values indicate that the watershed has a low retention capacity. 72 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Values a and b represent the characteristics of a watershed that reflect a combination of complex parameters such as watershed area, slope of ground surface within the watershed, watershed shape, length of river networks, slope of river networks, river network density, vegetation, land use, geological structure, elevation, temperature, wind speed, humidity, solar radiation, rainfall depth and climate. Research conducted by David A Post (2004) in the watersheds in the Burdekin River basin (140 000 km 2 catchment area) in North Queensland, Australia, showed that the value of b ranges from 1.14 to 2.6 and tends to increase for higher annual rainfall. The value of a for these watersheds are close or equal to 100. Research conducted by Dhani Irwanto (2010) concluded that areas of high rainfall, such as in the islands of Sumatera, Java, Bali, Kalimantan, Sulawesi and Papua, show values of a close to 100, while areas that have low rainfall, such as in Nusatenggara, show values of a of less than 100. The b values in areas with high rainfall range between 1 and 4. The values of b are related to the forest coverage, watershed area, surface slope, length of river networks, slope of river networks and river network density. Dhani Irwanto (2011, 2012) has conducted research in the southern part of West Java by analyzing 8 watersheds with the following characteristics. 1. No significant artificial stream regulation (e.g. irrigation, drinking water and reservoirs); 2. No lake with a significant area in the watershed; 3. Relatively little residential areas and arable land; 4. Geological structures which are dominated by volcanic rocks and soil; 5. Continuous data availability or nearly continuous In 2013 the research was extended by adding some other watersheds to the above. Several watershed parameters have been studied and the following equations were established: 1. Models with 1 parameter: b = 3.1873 FC0.0923 ± 14.7% dengan R2 = 0.12 b = 1.3902 RL0.1436 ± 11.1% dengan R2 = 0.51 b = 1.3988 CA0.1357 ± 12.0% dengan R2 = 0.44 2. Models with 2 parameters: b = 2.1896 FC0.0923 SS-0.2574 ± 10.8% dengan R2 = 0.55 b = 1.7883 FC0.0923 RL0.1138 ± 10.4% dengan R2 = 0.55 b = 1.9244 FC0.0923 CA0.0947 ± 12.1% dengan R2 = 0.41 3. Model with 3 parameters: b = 1.2215 FC0.0923 SS-0.2574 RL0.1150 ± 5.5% dengan R2 = 0.89 b = 1.1055 FC0.0923 SS-0.3044 CA0.1154 ± 5.7% dengan R2 = 0.85 where, FC - ratio of forest cover and watershed (FC ≥ 10%) CA - watershed area (km2) 73 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT RL - length of streams with ≥ 1 km2 basin area (km) SS - average slope of the watershed surface All watersheds have values of a = 100. On this preliminary assessment the flow duration curves of the projects were estimated based on the following equations (Dhani Irwanto, 2013) a  l n  1  y   x b a = 100 b = 1.2215 FC 0.0923 SS-0.2574 RL 0.115 Y is ln (normalized flow), x is percentage of exceeded flows, a is perennially factor, the percentage of exceeded flows of non-zero flows, b is retention constant, a constant that represents the slope of the flow-duration curve, FC is ratio of forest cover and watershed (FC ≥ 10%), the SS is average slope of the watershed surface and RL is length of streams with ≥ 1 km 2 basin area (km). The FC, RL an SS values were estimated based on the DEM and Forest/Non-forest maps, automatically generated via GIS software. 5.4.3.5 PHASE 8 5.4.3.5.1 PRELIMINARY DESIGN The preliminary design of plant elements in this assessment is aimed to obtain the design parameters of plant elements that will be used to perform the cost estimates. Plant elements of a SHP may consist of, a weir, an intake, headrace channel and tunnel, a headpond or a surge tank, a penstock, a powerhouse, mechanical and electrical equipment, access roads, switchyard/panels and other civil structures. Design parameters at this early stage are determined using general formulas which validity has been tested in past projects. Below are some general formulas used in this preliminary assessment. 1. Weir Hweir = FSL – Elbed Elcrest = FSL + FF FF = 1.41 × CA/BR + 1 Where Hweir - spillway height measured from the riverbed (m) 74 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT FSL - full supply level at the weir (m) Elbed - riverbed elevation at the weir (m) Elcrest - crest elevation (m) FF - design flood height and freeboard (m) CA - catchment area (km2) BR - weir length measured from both abutment walls (m) 2. Headrace channel and tailrace channel Q h vk  n b = kh 2      vn  I  2/3   2/3   k m    h     k 2 1m   2 HL = IL where: h - channel height not including freeboard (m) b - channel bed width (m) m - side slope n - Manning’s roughness coeffiecient Q - design discharge (m3/s) k - B/H I - longitudinal inclination of channel L - channel length (m) v - velocity (m/s) HL - headloss in the channel (m) 3. Penstock DP = 0.72Q0.5 K s v1.9 HL  0.002587 1.1 DP Ks = 0.42 75 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT where: DP - penstock diameter (m) Q - design discharge (m3/s) HL - headloss (m) V - design velocity (m/s) 5.4.3.5.2 PLANT PARAMETERS 1. Turbine The selection of turbine types is determined by three parameters. These are the design discharge, head, and mechanical and electrical equipment prices. For a preliminary stage, the selection of the type of turbine can be determined based on the following chart (Figure 5.11). 76 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 5.11 – Turbine selection chart. Figure 5.12 – Specific speed chart. 2. Installed Capacity The installed capacity is estimated using the following equation. Pi =  g Q Hnet where Pi - installed capacity (kW)  - plant efficiency at design discharge g - acceleration of gravity (m/s2) Q - design discharge (m3/s) Hnet - net head (m) The net head is estimated by the following equation. Hnet = Hgross – HL where Hgross - gross head (m), that is the full supply level at the weir minus the tailwater level or turbine axis level HL - headloss (m) 77 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 3. Energy and Capacity Factor The energy potentially generated with the layout, size of the elements of the project and the flow availability is estimated using the following equation. t  tmax E pot   P dt t 0 t where Epot - energy potentially generated (kWh) t - time (hour) Pt - plant power at “t” time (kW) The potentially generated estimated energy is calculated using the flow duration curve considering t max = 1 year. The estimated saleable energy is calculated using the following equation. Esale = Epot kp kt where Esale - saleable energy (kWh) kp - percentage of plant stoppage and losses kt - percentage of transmission losses Loss of energy in the power plants is usually caused by outages for maintenance, outages due to disturbances and loss of discharge. Energy losses in the transmission might be caused by the conductor, from outages due to maintenance and outages due to other interferences. Capacity factor is defined as the ratio between the energy generated in a certain period and the potential energy generated when the plant, is in full capacity during the same period. It embraces the following definitions.  Potential capacity factors, i.e. the plant capacity factors with the existing flow availability without any loss.  Salable capacity factor, which is the plant capacity factor that has been reduced by the plant use and the losses in the plant and transmission line. 4. Energy losses of the power plant Energy losses of the power plant (due to maintenance outages, outages due to disruption and loss of discharge) are considered to be 4.0% of the energy potentially generated. Loss at transmission (due to conductivity and due to maintenance outages and blackouts as a result of external interferences) are considered to be 0.2% of the energy potentially generated. 78 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 5.4.3.5.3 PROJECT COST ESTIMATE The estimated project cost in this preliminary study is obtained from the available cost data, the preliminary layout and cost statistic of SHP development in Indonesia. The cost data was adjusted to the current exchange rate, inflation and fairness of costs. Statistical approaches such as regression and deviation analysis were used to generalize formulae to find relationships of costs and the specific parameters of the project components. The parameters are as follows. 1. Weir and intake: BR, Hweir, CA, energy dissipator type 2. Settling basin: Q, S 3. Headrace channel: Q, I, L, S 4. Headrace tunnel: Q, L, N, Fg 5. Syphon: Q, N, UCS 6. Headpond: Q, S 7. Surge tank: Q, H, L, N, Fg 8. Penstock: Q, H, UCS, N 9. Powerhouse: Q, H, N, S 10. Tailrace channel: Q, I, L, S 11. Access road: L, W, S 12. Bridges: L, W 13. Gates and trashracks: Q, UCS 14. Plant equipment: P, H, N, turbine type 15. Transmission line: V, L 16. Substation: V, N where: BR - weir length, Hweir - weir height, CA - watershed area, Q - design discharge, I - longitudinal slope, L - length, UCS - steel unit price, H - head, W - width, V - voltage, N - number, S - original ground slope, Fg - geological condition factor The estimated project cost is expressed in optimistic, moderate and pessimistic conditions, reflecting variations of the cost dependent on the conditions on the field, work implementation method, quality of the equipment, level of project management and unpredictable conditions. The following example depicts the cost curve for the penstock unit cost. In Figure 5.13 there are three condition levels expressed. Optimistic condition is expressed with the bottom line, pessimistic condition with the superior line and the moderate condition is expressed with the intermediate line. This study is based on similar previous projects. 79 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 5.13 – Cost curve for penstock unit cost. The costs of land and plant acquisition were assumed from similar projects and location in the past. The highest values, based on the location of the project area, were conservatively selected. 5.4.3.5.4 ECONOMIC PARAMETERS The considered project economic lifetime is 20 years. Project construction period is estimated to be 2 years. In this preliminary study two assumptions of loan interest are made i.e. 12% for local bank loans and 10% for foreign direct investment. The capacity factor is taken as 65%. The plant operation costs, which include labor costs, material costs, equipment costs, management fees, cost of parts replacement, repairs and maintenance costs of civil structures, and insurance premiums are estimated at 3% of the annualized project cost. The prevailing profit tax is 25%. Electricity sales tariff applicable to the projects in accordance with Ministerial Regulation N.º19 year 2015 is USD 0,12/kWh for the first 8 years. From the following year until the 20 th project year the tariff is USD 0,075/kWh and depending on local factors calibration. The economic indicators privileged in this study are the project internal rate of return (IRR) and the levelized cost of energy (LCOE). The IRR is the interest rate that will discount an investment's future cash flows so that the sum of their present values will be equal to the amount disbursed at beginning of the investment. It is a widely used metric due to its simplicity and intuitiveness. However, it has some shortcomings, such as its inadequacy to compare mutually exclusive projects, the underlying assumption that reinvested cash flows earn a rate equivalent to the IRR, among others. For this reasons, LCOE is preferred over the IRR for ranking purposes, although the IRR is useful to convey an indication about the project’s potential profitability. LCOE is calculated by summing all the costs incurred during the lifetime of the SHP divided by the units of energy produced during the same period and is expressed in USD/MWh. In calculating LCOE the time value of money has to be accounted for, which is reflected by discounting the operating costs and 80 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT generated energy trough the applicable average cost of capital. LCOE has the important advantage over other indicators of allowing a direct comparison across different projects and generation technologies. 5.4.3.5.5 RISK LEVEL Hydropower projects are considered high risk in costs and revenues due to their high dependency on water resources availability and site specific structures. Project cost risk is the most important factor to consider, which is highly reliant on the level of detail of the survey, investigation, analysis, design, construction and project management practices. Finally, they all depend on the level of proficiency of the experts involved in the project. Those risks are considered in this study based on similar projects in the past, expressed in three levels, as follows.  Optimistic - Has a relatively low level of risk, most favorable natural conditions, and most appropriate way of implementation of the project.  Moderate - Has a relatively moderate level of risk, moderate natural conditions, and moderate way of implementation of the project.  Pessimistic - Has a relatively high level of risk, most adverse natural conditions, and most unappropriated way of implementation of the project. The Consultant decided to consider only the moderate scenario in the following phases of this study. The results of the preliminary site assessment are presented in Annex III. 5.4.3.6 RESULT 5.4.3.6.1 NTT The relation between the investment cost and the installed capacity is shown in Figure 5.14 below. In the performed analysis the Consultant chose to considerate the design capacity limited to the maximum of 10 MW. This means that projects whose optimal design capacity was calculated above 10 MW, were considered in their version of 10 MW to comply with the defined power limits of the study. However, it should be noted that independent power production in Indonesia is not limited to 10 MW, although the direct appointment option for the PPA is, as mentioned in section 3.2.1. Regarding the NTT SHP sites, there were two projects that exceeded 10 MW when designed to optimal capacity. For the sake of aggregate results presentation the investment cost related to the installed capacity of 10 MW versions was considered. 81 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 5.14 – Investment cost vs installed capacity for NTT region. From the data analysis it is evident that there is a significant correlation between the investment cost and the installed capacity (optimal). Regarding the LCOE values, approximately 44% of the SHP sites in NTT have values lower than 100 USD/MWh (Figure 5.15). The minimum value is 64 USD/MWh and the maximum of 326 USD/MWh. Figure 5.15 – Distribution of LCOE for NTT region. After analyzing the IRR distribution (Figure 5.16), one can conclude that practically all the SHP projects in these islands have a positive IRR. For this region the average IRR, under the defined conditions, is 12.4%, which can be considered a quite significant value. 82 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 5.16 – Distribution of IRR for NTT region. 5.4.3.6.2 MALUKU The relation between the investment cost and installed capacity regarding the Maluku Islands is shown in Figure 5.17. Like in the NTT islands, the Consultant identified two SHP sites that exceeded 10 MW for optimal design. The investment costs considered in these two cases correspond to the installed capacity of 10 MW. Figure 5.17 – Investment cost vs installed capacity for Maluku region. It is also noticeable in this case a significant correlation between the investment cost and the installed capacity. Regarding the LCOE values, only one SHP site has a LCOE lower than 100 USD/MWh (Figure 5.18). For this region, the average LCOE is 240 USD/MWh. The two higher LCOE values can be explained by the fact that the two SHP projects in question (JicaPR 1227 and JicaPR 1228) envisage an installed capacity of only 0.2 MW. 83 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 5.18 – Distribution of LCOE for Maluku region. In the wake of the IRR distribution analysis (Figure 5.19), one can observe that three projects have an IRR lower than 1%. For this region, the average IRR is 5.9%, which can be considered quite low. Naturally, the projects with negative IRR correspond to the highest LCOE values. Figure 5.19 – Distribution of IRR for Maluku region. The selected economic indicators show the general low attractiveness of the studied SHP projects in Maluku, in particular when compared to NTT. 84 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 5.4.3.6.3 MALUKU UTARA The relation between the investment cost and the installed capacity in Maluku Utara region is presented in Figure 5.20. Figure 5.20 – Investment cost vs installed capacity for Maluku Utara region. From the analysis of the exhibited data it is evident a very good correlation between the investment cost and the installed capacity. For this region, the average LCOE is 175 USD/MWh (Figure 5.21). Figure 5.21 – Distribution of LCOE for Maluku Utara region. After analyzing the IRR distribution (Figure 5.22), one can conclude that all the SHP projects have a positive IRR. For this region, the average IRR is 7.8%. 85 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 5.22 – Distribution of IRR for Maluku Utara region. Only seven SHP projects were selected for the Maluku Utara region, showing varied grades of economic attractiveness. 5.4.3.6.4 SULAWESI The relation between the investment cost and the installed capacity in Sulawesi region is depicted in Figure 5.23. The Consultant identified twelve SHP sites with envisaged (optimal) capacity above 10 MW. The investment costs herein presented for these twelve cases correspond to the installed capacity of 10 MW version of the project. Figure 5.23 – Investment cost vs installed capacity Sulawesi region. From the data analysis one can conclude that there is one SHP project that is clearly outside the expected cost zone. This particular project (id: JicaPR 0747) comprises the construction of a significant dam that weights on the investment cost and unbalances the project, given the estimated capacity. 86 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Regarding the LCOE values, approximately 38% of the SHP sites in Sulawesi have values lower than 100 USD/MWh (Figure 5.24). The average LCOE is 150 USD/MWh. Figure 5.24 – Distribution of LCOE for Sulawesi region. Analyzing the results one can see that there are two projects with extremely high LCOE values. The project with the LCOE of 570 USD/MWh corresponds to a previously mentioned, JicaPR 0747, which can be explained by the high investment cost. The highest LCOE value estimated (890 USD/MWh) corresponds to the project JicaPR 0755. This project foresees the installation of SHP with an installed capacity of 0.59 MW. The high LCOE value, and corresponding weak economics, can be partly explained by the excessive transmission line length (41 km) to the project’s scale. After analyzing the IRR distribution (Figure 5.25), one can conclude that 93% of the SHP projects have a positive IRR. For this region, the average IRR is 12.1%. However, it shall be noted that 60% of the projects exhibit an IRR equal or exceeding 10%. 87 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 5.25 – Distribution of IRR for Sulawesi region. 5.4.3.6.5 OVERALL The present subchapter presents the aggregate results of the economic evaluation. The relation between the investment cost and the installed capacity for the whole focus area of NTT, Maluku, Maluku Utara and Sulawesi is exhibited in Figure 5.26. Figure 5.26 – Investment cost vs installed capacity in all the regions. The main conclusions to be drawn from this figure are that the investment cost per MW of installed capacity are close in the NTT and Sulawesi regions and are generally somewhat higher for the regions of Maluku and Maluku Utara. This can be partially explained by the distance from the SHP to the nearest 88 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT village which is, in a general appraisal, higher in Maluku and Maluku Utara regions. This distance is directly associated with the cost of the transmission lines and access roads. Figure 5.27 – Distribution of LCOE in all the regions. Figure 5.28 – Distribution of IRR in all the regions. Regarding the values of LCOE and IRR, one can conclude that only a few projects in Maluku Utara and NTT regions may eventually be considered feasible. The most attractive SHP sites seem to be, therefore, located in the Sulawesi region followed by NTT. 89 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 5.4.4 PRIORITIZATION STAGE 5.4.4.1 OVERVIEW The objective of this stage is the prioritization of the sites analyzed in the previous step. The prioritization stage is divided in two phases as presented in Figure 5.29. Figure 5.29 - Workflow for the prioritization stage. 5.4.4.2 PHASE 9 This phase consists in the definition of the criteria for the multi-criteria analysis. The multi-criteria analysis will weight quantitative and qualitative variables, for an overall score to rank the projects. After careful evaluation and based on the gathered information, the multi-criteria analysis was based on the following as aspects:  Installed capacity;  LCOE - Levelized Cost of Energy;  Protected and environmentally sensitive areas;  Local electrification demand. In order to rate the analysed projects, the four selected aspects were graded between 0 and 10 points. The more points the project has, the higher the ranking of the site. 1. Installed capacity The installed capacity indirectly defines the generation potential of a given site. In fact, average annual production is in practice a more meaningful parameter to characterize hydropower contribution to energy provision, in particular for SHP and run-of-river schemes. However, annual production is an estimate, presents different variability and is lees often used as a quantified objective in terms of energy policy. For these reasons, the installed capacity parameter was selected, not only for what it represents by itself (peak capacity), but as a proxy for generation potential. Therefore, the main benefits underlying a preference for larger capacity are the following:  Greater contribution to address the energy deficit challenge that Indonesia faces; 90 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT  Larger share of renewable energy in the national energy mix;  Coverage of a larger population per project, with a reliable and typically cost competitive technology. In order not to prejudice the economical evaluation of the projects with optimum capacity, in terms of LCOE as per the following section, it was decided to consider the estimated optimal capacity for the present prioritization stage (instead of imposing the 10 MW upper limit). There are 16 schemes in such conditions with capacities up to 26 MW. It must be noted that upper and lower limits defined for this study had the objective of framing the analysis in the presence of varied scales of the original data, where the upper limit is in line with most international definitions for SHP. However, it is once more noted that this limit has no practical correspondence in Indonesia’s institutional framework for hydropower generation, except for the PPA. Hence, the Consultant chose to use a linear variation classification, where 0 points were attributed to projects with null installed capacities and 10 points to projects with 10 MW. Projects with installed capacities over 10 MW were also attributed 10 points (Figure 5.30). Figure 5.30 – Installed capacity classification. 2. LCOE Other key factor to rate a project is its economic interest, or cost competiveness, in this case depicted by its LCOE (Levelized Cost of Energy). The LCOE not only allows the comparison of different methods of electricity generation, but also can be regarded as the minimum cost at which electricity must be sold in order to break-even over the lifetime of the project. The Consultant chose to attribute the higher classification to all the projects with LCOE below 50 USD/MWh and null to projects with LCOE higher than 300 USD/MWh (Figure 5.31). A linear progression was considered for projects with LCOE between the referred thresholds. 91 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Figure 5.31 – LCOE classification. 3. Protected and environmentally sensitive areas Protected and environmentally sensitive areas are of the most importance when evaluating a site. Though the production of electricity through SHP plants is possible in protected areas of Indonesia after the necessary licensing process, the Consultant chose to grade projects according to its location in terms of potential environmental sensitivity. Based on the analysis of the legislation, the Consultant classified the projects according to the following grid (Table 5.10). Table 5.10 – Protected and environmentally sensitive areas classification. Site area Score HAS-W – Natural Reserve 0 HL – Protected Forest 5 HPK – Convertible Production 7.5 Forest HPT – Limited Production Forest 7.5 HP – Production Forest 7.5 APL – Other Use 10 Outside protected area 10 4. Local electrification demand In order to assess the affected population, the Consultant evaluated the demand within a distance from the SHP site and compared it with the produced energy. This assessment was made using the annual energy production corresponding to the 90% discharge dependability. The demand considered for this analysis was described in section 5.3. Sites where the annual demand met the annual energy production, within a margin of 30%, were given a higher score. Another feature of the local electrification demand is the distance (radius around the SHP 92 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT site) where the demand meets production. The analysed distances were fixed in radius intervals of 5, 7.5, 10, 15, 20, 25 and 30 km around the SHP site, as shown in the following example (Figure 5.32). Figure 5.32 – Local electrification demand analysis example. Projects where there isn’t correspondence between the annual demand and annual energy production have null points. Projects where it is possible to satisfy the demand, the classification is attributed according to the following chart (Figure 5.33). Figure 5.33 – Local electrification demand classification. The multi-criteria results are presented in Annex IV. 93 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 5.4.4.3 PHASE 10 After the definition of the base criteria, the projects were globally scored according to the following weights for the Base strategy (grid expansion):  Installed capacity 20%  LCOE - Levelized Cost of Energy 40%  Protected and environmentally sensitive areas 20%  Local electrification demand 20% The resulting list of the most promising sites for the base strategy is presented in Annex V. In order to evaluate other strategic options, the CONSULTANT considered altering the weight of the multi-criteria aspects. Three alternative strategic options are considered:  Hydropower development  Environmental impact  Rural Electrification 1. Hydropower development In this strategy the focus is the maximization of the hydropower development, that is to say, to more directly address the increase in electricity offer policy objectives. Accordingly, the following weight distribution is established:  Installed capacity 50%  LCOE - Levelized Cost of Energy 20%  Protected and environmentally sensitive areas 10%  Local electrification demand 20% The list of the most promising sites in the hydropower development strategy is presented in Annex VI. 2. Environmental impact In this strategy the priority is the minimization of the environmental impact of the schemes. Hence, the following weights were adopted:  Installed capacity 10%  LCOE - Levelized Cost of Energy 20%  Protected and environmentally sensitive areas 50%  Local electrification demand 20% The list of the most promising sites in the environmental impact strategy sites is presented in Annex VII. 94 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 3. Rural Electrification In this strategy the focus is the local electrification demand, that is to say, to more directly address the rural energy demand near the project site. Accordingly, the following weight distribution is established:  Installed capacity 10%  LCOE - Levelized Cost of Energy 30%  Protected and environmentally sensitive areas 10%  Local electrification demand 50% The list of the most promising sites in the rural electrification strategy is presented in Annex VII. 5.5 ANALYSIS OF ISOLATED GRID SYSTEMS An off-grid SHP site is a project not connected to the main electrical grid that supplies a nearby village or villages. The choice of an off-grid solution for a selected SHP site is based on the distance to the main grid. When the cost of construction of the transmission line is above a pre-set value, one can choose not to connect it to the local network. If there is sufficient demand in the proximity, the site may be considered fit for off-grid. In order to evaluate if a SHP site is adequate as the basis for an isolated grid system, it is important to determine the distance of the site to the existing/planned grid. Even though there is some grid information (existing and planned lines) for NTT and Maluku Island, the Consultant chose to consider the information digitized from RUPTL 2016-2025 for all the regions. This information comprised the locations of the substation and main transmission lines. After inserting this information in a GIS environment and crossing it with the SHP sites, it was possible to determine the minimum distance between the grid and the sites. The planned grid by PLN was considered in this analysis. [5] Due to the fact that digitized information only contains 70 kV or higher voltage, the Consultant decided to consider a minimum grid connection distance to a substation of 30 km. Projects with a distance greater than 30 km are deemed potential isolated grid SHP sites The number and location of the sites that can be considered off-grid solutions, according to the established criteria, is presented in Table 5.11. 95 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Table 5.11 – Potential isolated grid SHP sites (with 30 km or greater distance to grid). Percentage Region Number relatively to total SHP in region NTT 16 32% Maluku 7 50% Maluku Utara 5 71% Sulawesi 28 33% Total 56 35% Based on this criterion, 36% of the locations proposed on the list of the most promising sites are potential isolated grid SHP sites. The following step consisted in verifying if the energy production and peak capacity of the potential isolated grid SHP sites meets the demand of the nearby villages. The methodology used to determine if the demand meets the SHP capacity is similar to the one used to assess the affected population in the multi-criteria analysis. Since it is intended that the SHP site must supply the populations as long as possible, this assessment was made using the annual production energy corresponding to the 90% discharge dependability. The analysed distances were fixed in radius of 5, 10, 15, 20, 25 and 30 km around the potential isolated SHP site as shown is the example, Figure 5.34. Figure 5.34 – Isolated grid SHP potential site example. 96 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT In case of the islands of NTT, Maluku and Maluku Utara, the villages suitable for off-grid connection were the ones proposed in the Geospatial Electrification Planning by the Earth Institute. For the determination of the districts suitable for isolated systems in the island of Sulawesi, the Consultant chose to include all the districts outside the range of 70 km of the existing/planned substations. This distance criterion took into account the fact that the only substations and grid obtained have a voltage equal or greater than 70 kV (the similarity in the figures is coincidental; 70 km is estimated as the reasonable limit distance to be supplied from a 70 kV substation). Potential sites where the annual demand within the defined radius met the annual energy production and the installed capacity met the peak demand (MW), within a margin of 30%, were considered the preeminent off-grid SHP sites. The Consultant identified 17 SHP sites where the annual energy demand meets annual production (Table 5.12). Table 5.12 – Isolated grid SHP potential sites. Annual Energy Demand meets Annual Production. Annual Energy Demand (GWh) Annual Project ID Code Region Production 5 km 7.5 km 10 km 15 km 20 km 25 km 30 km (GWh) radius radius radius radius radius radius radius PLTM Sabuku fs_215 Sulawesi 28.1 0.0 8.1 8.1 8.1 13.7 20.7 28.0 Mikuasi (PLN) hp_0447 Sulawesi 6.7 4.0 4.0 6.9 18.0 19.9 27.9 33.4 Buleleng hp_0456 Sulawesi 9.9 0.0 0.0 0.0 0.0 5.7 10.8 10.8 Lasolo-2 JicaPR_0751 Sulawesi 5.4 0.0 0.0 0.0 5.4 6.5 6.5 7.6 Toma-2 JicaPR_0754 Sulawesi 4.1 0.0 0.0 0.0 1.0 4.2 4.2 4.2 Maraja-3 JicaPR_0848 Sulawesi 3.2 0.0 0.0 0.0 3.8 26.1 30.2 30.2 Palame-1 JicaPR_1094 NTT 4.0 0.1 0.1 0.4 1.6 3.1 5.6 7.6 Palame-2 JicaPR_1095 NTT 10.3 0.0 0.1 0.4 1.6 2.6 6.0 8.5 Kadassa-2 JicaPR_1097 NTT 4.4 0.0 0.0 0.6 1.1 2.4 4.0 4.9 Melolo-1 JicaPR_1110 NTT 1.8 0.5 0.5 1.0 2.1 3.9 6.1 8.2 Melolo-2 JicaPR_1111 NTT 4.3 0.1 0.5 0.9 2.0 4.4 5.8 7.8 Menu-1 JicaPR_1181 NTT 12.0 3.3 4.9 8.7 15.2 21.0 27.2 33.4 Menu-2 JicaPR_1182 NTT 20.0 1.9 4.3 6.9 13.2 19.1 25.6 31.9 Tuke JicaPR_1184 NTT 11.4 2.2 4.4 7.1 13.8 21.0 28.4 34.5 Leman JicaPR_1208 Maluku 3.6 0.0 0.9 1.1 2.2 3.0 3.6 5.0 Pastu Ra JicaPR_1247 Maluku 3.3 0.2 0.4 1.4 2.7 4.5 6.1 9.2 Wai Miha JicaPR_1251 Maluku 3.6 0.4 0.5 0.8 1.4 1.9 3.5 5.1 Annual Energy Demand (GWh) meets Annual Production (GWh) Regarding the peak demand and installed capacity analysis, the Consultant identified 15 SHP sites where the peak demand meets the installed capacity (Table 5.13). 97 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Table 5.13 – Isolated grid SHP potential sites. Annual Energy Demand meets Annual Production. Annual Energy Demand (GWh) Annual Project ID Code Region Production 5 km 7.5 km 10 km 15 km 20 km 25 km 30 km (GWh) radius radius radius radius radius radius radius PLTM Sabuku fs_215 Sulawesi 3.5 0.0 1.7 1.7 1.7 2.8 4.2 5.7 Riorita hp_0401 Sulawesi 0.7 0.0 0.0 0.6 2.0 2.0 4.1 4.8 Mikuasi (PLN) hp_0447 Sulawesi 0.8 0.8 0.8 1.3 3.5 3.9 5.4 6.5 Buleleng hp_0456 Sulawesi 1.2 0.0 0.0 0.0 0.0 1.2 2.2 2.2 Toma-3 JicaPR_0755 Sulawesi 0.3 0.0 0.0 0.0 0.2 0.2 0.2 1.9 Palame-1 JicaPR_1094 NTT 0.5 0.0 0.0 0.1 0.3 0.7 1.2 1.6 Kadassa-2 JicaPR_1097 NTT 0.6 0.0 0.0 0.1 0.2 0.5 0.9 1.1 Melolo-1 JicaPR_1110 NTT 0.2 0.1 0.1 0.2 0.5 0.8 1.3 1.8 Melolo-2 JicaPR_1111 NTT 0.5 0.0 0.1 0.2 0.4 1.0 1.2 1.7 Dondo-1 JicaPR_1124 NTT 0.3 0.1 0.3 0.6 1.3 2.6 3.5 4.4 Menu-1 JicaPR_1181 NTT 1.5 0.7 1.1 1.9 3.3 4.5 5.9 7.2 Mama JicaPR_1204 Maluku 0.6 0.0 0.0 0.1 0.2 0.3 0.4 0.5 Leman JicaPR_1208 Maluku 0.4 0.0 0.2 0.2 0.4 0.6 0.7 0.9 Mala JicaPR_1220 Maluku 0.8 0.1 0.1 0.1 0.2 0.3 0.5 0.8 Wai Miha JicaPR_1251 Maluku 0.5 0.1 0.1 0.2 0.3 0.4 0.7 1.0 Annual Energy Demand (GWh) meets Annual Production (GWh) Comparing the previous results, one can refer that there are 6 most promising isolated grid SHP projects as exposed in Table 5.14. Table 5.14 – Most promising isolated grid SHP potential sites. 5 km 7,5 km 10 km 15 km 20 km 25 km 30 km Project ID Code Region radius radius radius radius radius radius radius PLTM Sabuku fs_215 Sulawesi Mikuasi (PLN) hp_0447 Sulawesi Buleleng hp_0456 Sulawesi Palame-1 JicaPR_1094 NTT Menu-1 JicaPR_1181 NTT Leman JicaPR_1208 Maluku Annual Energy Demand meets Annual Production in exact radius Annual Energy Demand meets Annual Production in adjacent radius The complete analysis results for all the isolated grid SHP potential sites are presented in Annex IX. 98 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 5.6 RECOMMENDATIONS FOR FURTHER DEVELOPMENTS The study carried out as part of the analysis stage can be considered as pre-feasibility level. The objective of this study is to identify the best sites and facilitate the choice of future projects. The immediate next step should be the selection of the priority areas to be developed and their possible inclusion on the different cooperation protocols currently in place for funding purposes, or, ultimately, allowing IPP’s to develop them. In terms of the technical assessment, the following step should consist on a more detailed analysis at feasibility study level of the selected sites, including the complementary field surveys (geotechnical investigations, topography and environmental and social impact assessment). At this stage, it shall be possible to proceed with the adjustment of the scheme based on a more accurate cartography. Another important factor is to consider the improvement of the flow availability analysis. The evaluation of the flow availability should ideally be based on the records of rainfall and runoff provided by nearby stations. In the cases there aren’t any gauging stations nearby, it should be considered the installation of one in the river for a considerable period of time. Another important aspect is the location of the lower voltage power lines (20 kV) and correspondent substations. It must be noted that this type of information was not available for this study, so a number of simplified assumptions had to be made. With available information at a more detailed level it will be possible to validate the proposed isolated grid projects and eventually consider new ones. 5.7 UPDATE OF THE NATIONAL GIS DATABASE Following the list of most promising sites derived on the present chapter, the GIS Database of SHP developed under the current technical assistance and presented in detail in the accompanying GIS Database User’s Manual and the Small Hydropower Mapping Report was updated with the resulting new improved features of the sites. 99 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 6 CONTRIBUTIONS TO THE GEOSPATIAL ELECTRIFICATION PLANNING TOOL The Consultant was expected to coordinate with the parallel contract on the Geospatial Electrification Planning Tool and contribute to its latest review with the inclusion of the generation sources from SHP that are a result of this assignment. As such, the Consultant prepared the list of most promising sites with key energy/cost SHP characteristics in different formats (.csv, .shp) for ease of integration on the planning tool and submitted it accordingly (Annex V to Annex VIII). Furthermore, this list comprehends two different design approaches since it could be used for isolated grid systems or for grid connection. For isolated grid systems the SHP shall ideally be designed to be operational most days of an average hydrological year, meaning that the design flow is equal to the firm flow. This is an essential condition since it would dramatically reduce diesel dependability on isolated grids, thus reducing operational costs and CO2 emissions. It should be stressed that these isolated grids should always have a backup system for abnormal dry seasons or years, where in some days the water availability may be insufficient for the local demand. This backup is usually diesel based and if the SHP is well design should have few working hours per year. The grid connection SHP design is based on the minimization of the energy generation cost. Given the existence of more generation spots on the grid, it is not essential the all year-round generation capacity, but more important the minimization of the project’s energy cost. The Geospatial Electrification Planning tool allows for non-linear grid expansion by identifying the least cost electrification option, based on a minimum spanning tree model. The planning tool considers grid expansion, isolated mini-grids or solar home system systems attached to each household. The planning model iterates through every identified settlement and identifies which of the three electrification options is least cost. The inclusion of these new projects may imply major changes on the planning tool results from having lower generation costs. Firstly, the connection of SHP to the grid will lower the grid energy cost, which will additionally lower the grid expansion costs, possibly resulting on a more widespread grid and fewer off-grid systems. Secondly, the SHP designed for isolated grid systems could generate mini-grids with settlements that were beforehand planned to connect to the grid or as solar home system systems. In conclusion, this planning tool is based on grid expansion by identifying the least cost electrification option and this new generation spots should result on a cost and environmental impact improvement of the electrification planning for the provinces of NTT, Maluku, Maluku Utara, and Sulawesi in eastern Indonesia. 100 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 7 CONCLUSIONS The main purpose of the Small Hydropower Potential in NTT, Maluku, Maluku Utara and Sulawesi Report was the energy sector and SHP role review and the review and prioritization of the SHP potential in the region for the creation of the list of most promising sites located in the focus area. On the energy sector review, the overall existing power generation and distribution situation in Indonesia and in NTT, Maluku, Maluku Utara, and Sulawesi in particular was presented. This energy outlook was realized considering the current situation and the existing plans for energy access development. The energy outlook also worked as an introduction to the SHP’s role review. For this review the Consultant assessed the current legal framework concerning the planning and developing of SHP and the strengths and weaknesses of using SHP with isolated grid systems focus. The general review of the legal framework converged on the direct appointment method for PPA requests and most relevant licenses for SHP implementation, since they are the significant identified issues on the licensing process. The identified challenges from using SHP were studied and possible solutions were suggested. The most significant identified concern with SHP solution for isolated systems is the highly seasonable power production considering the water resource dependability, although this can be easily overcome with backup generation and still offering lower energy cost compared with thermal power. For the creation of the list of most promising sites in NTT, Maluku, Maluku Utara and Sulawesi, first the list of already identified potential for small hydro was updated with the outcome of the site visits to major wilayahs (this mission allowed an addition of 54 new projects). Following this, a gradual screening through step-wise validation of information was conducted, resulting on a list of the 167 most promising sites on the focus area. The multi-criteria analysis used for the prioritization process was based on installed capacity, LCOE, protected and environmentally sensitive areas and local electrification demand that were weighted differently and combined for diverse strategic options and that will allow decision makers to better understand the most important SHP in each scenario. Additionally, the SHP list with the isolated grid system focus was analyzed. For this analysis it was considered the annual energy production limited by the 90% discharge dependability and the nearby local demand if located far enough from the existing/planned grid. For this analysis it was necessary to perform a local demand forecast for the year 2025 in accordance with the demand study performed for the Geospatial Electrification Planning Tool. Both grid and off-grid SHP analysis results were prepared to be incorporated on the Geospatial Electrification Planning Tool with the ultimate goal of improving the electrification planning on the study regions of NTT, Maluku, Maluku Utara and Sulawesi. Overall, this report covers the proposed objective to create the Improved electrification planning by integrating small hydropower potential for the provinces of NTT, Maluku, Maluku Utara, and Sulawesi in eastern Indonesia, with the expected results: To create the list of the most promising SHP sites in NTT, 101 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Maluku, Maluku Utara and Sulawesi; To create a list of potential SHP sites in NTT, Maluku, Maluku Utara and Sulawesi to be incorporated in the Geospatial Electrification Planning (GEP) Tool. 102 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT REFERENCES [1] International Monetary Fund, “World Economic Outlook 2016,” 2016. [2] Central Intelligence Agency, "The World Factbook," 2016. [Online]. Available: https://www.cia.gov/library/publications/the-world-factbook/geos/id.html. [Accessed October 2016]. [3] PLN, "Rencana Umum Pertagananana Listrika (RUPTL) 2015-2024 Executive Summary," Jakarta, 2015. [4] PLN, “Statistik Ketenagalistrikan 2015,” Jakarta, 2015. [5] PLN, "Rencana Umum Pertagananana Listrika (RUPTL) 2016-2025," Jakarta, 2016. [6] PLN, “Statistik Ketenagalistrikan 2013,” Jakarta, 2013. [7] PLN, “Statistik Ketenagalistrikan 2014,” Jakarta, 2014. [8] PLN, “Statistik Ketenagalistrikan 2010,” Jakarta, 2010. [9] PLN, “Statistik Ketenagalistrikan 2011,” Jakarta, 2011. [10] International Renewable Energy Agency, “Renewable energy technologies: cost analysis series - Hydropower,” 2012. [11] International Renewable Energy Agency, “Off-grid renewable energy systems: status and methodological issues,” 2015. [12] Alliance for Rural Electrification, “The potential of small hydro for rural electrification,” 2014. [13] The World Bank, “Peru: Overcoming the Barriers to Hydropower,” 2010. [14] United Nations Industrial Development Organization, “UNIDO Projects for the Promotion of Small Hydro Power for Productive Use,” 2010. [15] Skat Consulting, “Grid-Connected vs. Isolated Systems,” Switzerland. [16] JICA, “Hydro Inventory Study,” 1997. 103 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT [17] PLN, "Rencana Umum Pertagananana Listrika (RUPTL) 2013-2022 Executive Summary," Jakarta, 2013. [18] USGS, “Shuttle Radar Topography Mission (SRTM),” [Online]. Available: http://srtm.usgs.gov/. [Acedido em 09 06 2014]. [19] OpenMaps Foundation, “OpenStreetMap,” [Online]. Available: www.openstreetmap.org. [Acedido em Julho 2016]. [20] Badan Pusat Statistik, “BPS - Sensus Penduduk 2010,” [Online]. Available: http://sp2010.bps.go.id/. [Acedido em 07 2016]. [21] Intergovernmental Panel on Climate Change, “Special Report on Renewable Energy Sources and Climate Change Mitigation,” 2011. [22] JICA, “Project for the Master Plan Study of Hydropower Development in Indonesia,” Jakarta, 2011. [23] MoFo, “WebGIS Forest,” [Online]. Available: http://webgis.dephut.go.id. [Acedido em 09 06 2014]. [24] IHC, “IHC knowledgebase,” [Online]. Available: http://www.indonesia-hydro.com/knowledge_base. [Acedido em 09 06 2014]. [25] WorldClim, “WorldClim - Global Climate Data,” [Online]. Available: http://www.worldclim.org/. [Acedido em 09 06 2014]. [26] N. G. I. Agency, “VMAPO,” [Online]. Available: http://gis-lab.info/qa/vmap0-eng.html. [Acedido em 09 06 2014]. [27] N. G. I. Agency, “GEOnet Names Server (GNS),” [Online]. Available: http ://earth- info.nga.mil/gns/html/. [Acedido em 09 06 2014]. [28] GADM, “Global Adminstrative Areas,” [Online]. Available: http://www.gadm.org/. [Acedido em 09 06 2014]. [29] B. I. G. BIG, “Indonesian Geospatial Information Agency,” [Online]. Available: http://www.bakosurtanal.go.id/. [Acedido em 09 06 2014]. [30] D. E. N. DEN, “Kebijakan Energi Nasional (KEN) 2014-2050,” Jakarta, 2014. [31] E. S. A. ESA, “GlobCover,” [Online]. Available: http://due.esrin.esa.int/globcover/. [Acedido em 09 104 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 06 2014]. [32] W. M. O. WMO. [Online]. Available: http://www.wmo.int/. [Acedido em 09 06 2014]. [33] W. D. o. P. A. WDPA, “Protected Planet,” [Online]. Available: http://www.protectedplanet.net/. [Acedido em 09 06 2014]. [34] PLN, “PLN Statistics 2013,” Jakarta, 2013. [35] Asian Development Bank, “Energy Sector White Paper, 2014,” Manila, 2014. [36] European Small Hydropower Association, “Small Hydropower for Developing Countries,” 2006. [37] MEMR, “Pengelolaan Energi Nasional (PEN) 2006-2025,” Jakarta, 2006. [38] MEMR, “Rencana Umum Ketenagalistrikan Nasiona 2012-2031l (RUKN),” Jakarta, 2012. 105 ID.2016.R.007.1 ANNEX I – UPDATED LIST OF IDENTIFIED POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI UPDATED LIST OF IDENTIFIED POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI ID Project Name Province Latitude (WGS84) Longitude (WGS84) Installed Capacity (MW) Source PLN Wilayah JicaPR_1243 Fidi Maluku Utara 0.355834 127.838 5.30 Hydro Inventory Study_1997 WILMMU JicaPR_0794 Tangkak-2 Sulawesi Selatan -5.1294 120.071 24.00 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_1140 Taramanu-2 Nusa Tenggara Timur -9.7378 123.75 7.30 Hydro Inventory Study_1997 WILNTT JicaPR_1244 Tjiu-1 Maluku Utara 2.27702 128.354 3.80 Hydro Inventory Study_1997 WILMMU fs_214 PLTM Palasa Gorontalo 0.449472222 120.2364444 7.40 PLN_wilayah WILSULUTTENGGO JicaPR_1248 Ake Rain Maluku Utara -0.729117 127.802 0.90 Hydro Inventory Study_1997 WILMMU JicaPR_1239 Akelamo-1 Maluku Utara 1.29255 128.445 9.40 Hydro Inventory Study_1997 WILMMU JicaPR_1241 Akelamo-3 Maluku Utara 1.4343 128.661 4.00 Hydro Inventory Study_1997 WILMMU JicaPR_1118 Vang Reo Nusa Tenggara Timur -8.35963 120.479 78.00 Hydro Inventory Study_1997 WILNTT JicaPR_1188 Anail Nusa Tenggara Timur -8.24690 124.70000 1.20 Hydro Inventory Study_1997 WILNTT JicaPR_1119 Bema/Wera Nusa Tenggara Timur -8.43445 120.844 11.00 Hydro Inventory Study_1997 WILNTT JicaEX_0107 Kambera-2 Nusa Tenggara Timur -9.83515 120.193 17.02 Hydro Inventory Study_1997 WILNTT JicaPR_1144 Besi Nusa Tenggara Timur -9.41877 124.116 6.90 Hydro Inventory Study_1997 WILNTT JicaEX_0085 Malea Sulawesi Barat -3.176493 119.771231 182.00 Hydro Inventory Study_1997 WILSULSELRABAR fs_237 PLTM Soru Nusa Tenggara Timur -9.539972222 119.8198889 0.09 PLN_wilayah WILNTT JicaPR_1136 Bobo Nusa Tenggara Timur -8.77617 120.628 2.80 Hydro Inventory Study_1997 WILNTT JicaPR_1120 Buntal Nusa Tenggara Timur -8.4747 120.977 5.30 Hydro Inventory Study_1997 WILNTT JicaEX_0106 Tala Maluku Utara -3.30043 128.649 54.00 Hydro Inventory Study_1997 WILMMU JicaEX_0110 Talawi Maluku Utara 0.965435 127.98 7.50 Hydro Inventory Study_1997 WILMMU JicaEX_0105 Tamboli Sulawesi Barat -3.88006 121.353 25.80 Hydro Inventory Study_1997 WILSULSELRABAR fs_239 PLTM Waeroa Nusa Tenggara Timur -8.864941667 120.9982389 0.40 PLN_wilayah WILNTT JicaEX_0108 Wai Racang Nusa Tenggara Timur -8.51533 120.417 11.07 Hydro Inventory Study_1997 WILNTT fs_246 PLTM Wanokaka 2 Nusa Tenggara Timur -9.681413889 119.4865028 0.72 PLN_wilayah WILNTT JicaPR_1124 Dondo-1 Nusa Tenggara Timur -8.63309 121.882 1.20 Hydro Inventory Study_1997 WILNTT JicaPR_1125 Dondo-2 Nusa Tenggara Timur -8.67471 121.91 2.20 Hydro Inventory Study_1997 WILNTT JicaPR_1126 Dondo-3 Nusa Tenggara Timur -8.5655 121.947 3.80 Hydro Inventory Study_1997 WILNTT JicaPR_1227 Ela Maluku -3.55685 128.204 0.70 Hydro Inventory Study_1997 WILMMU JicaPR_1201 Ili-1 Maluku -3.33046 126.345 9.80 Hydro Inventory Study_1997 WILMMU JicaPR_1229 Halu Maluku -3.70682 128.027 1.30 Hydro Inventory Study_1997 WILMMU hp_0391 Halulai Sulawesi Tengah -1.43615 120.4281583 1.20 PLN (4 - Minihydro PLN Project) WILSULUTTENGGO JicaPR_1202 Ili-2 Maluku -3.27089 126.381 33.80 Hydro Inventory Study_1997 WILMMU JicaPR_1189 Irauri Nusa Tenggara Timur -8.20395 124.9 0.70 Hydro Inventory Study_1997 WILNTT JicaPR_1218 Isal-1 Maluku -3.12291 129.617 23.10 Hydro Inventory Study_1997 WILMMU JicaEX_0103 Isal-2 Maluku Utara -3.095964 129.633884 60.00 Hydro Inventory Study_1997 WILMMU JicaPR_1219 Isal-3 Maluku -3.03425 129.664 15.40 Hydro Inventory Study_1997 WILMMU JicaPR_1230 Jajawi Maluku Utara 0.512704 127.746 5.80 Hydro Inventory Study_1997 WILMMU JicaPR_1096 Kadassa-1 Nusa Tenggara Timur -9.60254 119.823 9.50 Hydro Inventory Study_1997 WILNTT JicaPR_1137 Jomal Nusa Tenggara Timur -8.75005 120.145 21.40 Hydro Inventory Study_1997 WILNTT JicaPR_1225 Jori Maluku -3.63568 128.239 0.70 Hydro Inventory Study_1997 WILMMU JicaPR_1097 Kadassa-2 Nusa Tenggara Timur -9.51892 119.891 3.80 Hydro Inventory Study_1997 WILNTT JicaPR_1093 Kalada Nusa Tenggara Timur -9.495 119.601 3.70 Hydro Inventory Study_1997 WILNTT JicaPR_0723 Ratodena Sulawesi Tengah -1.75315 120.645 28.60 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_1099 Kamatang-1 Nusa Tenggara Timur -9.62579 120.052 0.60 Hydro Inventory Study_1997 WILNTT JicaPR_1100 Kamatang-2 Nusa Tenggara Timur -9.60151 120.073 0.80 Hydro Inventory Study_1997 WILNTT JicaPR_1102 Kambera-1 Nusa Tenggara Timur -9.85961 120.11 3.30 Hydro Inventory Study_1997 WILNTT JicaPR_1103 Kambera-2 Nusa Tenggara Timur -9.83515 120.193 67.40 Hydro Inventory Study_1997 WILNTT JicaPR_1105 Kambera-3 Nusa Tenggara Timur -9.78125 120.245 7.40 Hydro Inventory Study_1997 WILNTT hp_0462 Sakita (Mampueno) Sulawesi Tengah -2.576 121.9668694 2.00 PLN (3 - Minihydro IPP Project) WILSULUTTENGGO JicaPR_1098 Kapunduk Nusa Tenggara Timur -9.53283 120.001 2.00 Hydro Inventory Study_1997 WILNTT JicaPR_1091 Karendi-1 Nusa Tenggara Timur -9.52253 119.472 21.50 Hydro Inventory Study_1997 WILNTT JicaPR_1092 Karendi-2 Nusa Tenggara Timur -9.46581 119.448 3.30 Hydro Inventory Study_1997 WILNTT JicaPR_1214 Kuma Maluku -3.49607 126.242 10.90 Hydro Inventory Study_1997 WILMMU JicaPR_1101 Lakalamba Nusa Tenggara Timur -9.55691 120.06 Hydro Inventory Study_1997 WILNTT JicaPR_1135 Laku Nusa Tenggara Timur -8.71188 120.591 6.10 Hydro Inventory Study_1997 WILNTT JicaPR_1232 Lamo-1 Maluku Utara 1.16536 127.574 4.30 Hydro Inventory Study_1997 WILMMU JicaPR_1106 Lamuk Nusa Tenggara Timur -9.8635 120.316 1.00 Hydro Inventory Study_1997 WILNTT JicaPR_0841 Lariang-11 Sulawesi Tengah -1.29848 119.698 12.30 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_1191 Larana Nusa Tenggara Timur -8.30618 125.084 0.60 Hydro Inventory Study_1997 WILNTT JicaPR_1122 Lawo Lambo Nusa Tenggara Timur -8.6769 121.296 3.60 Hydro Inventory Study_1997 WILNTT JicaPR_1185 Leke Nusa Tenggara Timur -9.83430 124.19100 4.20 Hydro Inventory Study_1997 WILNTT JicaPR_1208 Leman Maluku -3.10490 126.76900 6.30 Hydro Inventory Study_1997 WILMMU JicaPR_1224 Liocopa Maluku -3.26743 128.388 5.30 Hydro Inventory Study_1997 WILMMU hp_0422 Lobong Sulawesi Utara 0.772738 124.246235 1.60 PLN (4 - Minihydro PLN Project) WILSULUTTENGGO hp_0038 Lokomboro 1 Nusa Tenggara Timur -9.618311 119.296748 1.00 Consultant WILNTT hp_0121 Lokomboro Cascading (#4 & #5) Nusa Tenggara Timur -9.619165 119.294385 0.40 PLN (4 - Minihydro PLN Project) WILNTT hp_0122 Lokomboro Extention (#2 & #3) Nusa Tenggara Timur -9.61917 119.29439 1.00 PLN (4 - Minihydro PLN Project) WILNTT JicaPR_1228 Lot Maluku -3.60525 128.074 1.40 Hydro Inventory Study_1997 WILMMU hp_0216 Makariki Maluku -3.28 129.5444444 4.00 PLN (4 - Minihydro PLN Project) WILMMU JicaPR_1220 Mala Maluku -3.13269 128.799 6.70 Hydro Inventory Study_1997 WILMMU JicaPR_1212 Mala-1 Maluku -3.53009 126.443 36.10 Hydro Inventory Study_1997 WILMMU JicaPR_1204 Mama Maluku -3.18166 126.518 8.70 Hydro Inventory Study_1997 WILMMU JicaPR_0735 Malik Sulawesi Tengah -0.655367 123.261 3.00 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_1190 Manasako Nusa Tenggara Timur -8.24208 125.002 2.80 Hydro Inventory Study_1997 WILNTT JicaPR_1203 Mangi Maluku -3.24012 126.441 17.80 Hydro Inventory Study_1997 WILMMU JicaPR_1178 Mau Besi Nusa Tenggara Timur -9.53515 124.75500 2.40 Hydro Inventory Study_1997 WILNTT hp_0091 Ranteangin 6 Sulawesi Tenggara -3.636311 121.0709 6.30 Consultant WILSULSELRABAR JicaPR_1110 Melolo-1 Nusa Tenggara Timur -10.0081 120.465 1.90 Hydro Inventory Study_1997 WILNTT JicaPR_1111 Melolo-2 Nusa Tenggara Timur -9.96294 120.505 2.60 Hydro Inventory Study_1997 WILNTT JicaPR_1182 Menu-2 Nusa Tenggara Timur -9.82387 124.73 2.70 Hydro Inventory Study_1997 WILNTT JicaPR_1133 Meseh-1 Nusa Tenggara Timur -8.65108 120.368 10.00 Hydro Inventory Study_1997 WILNTT hp_0211 Ndungga Nusa Tenggara Timur -8.769308333 121.6784583 2.00 PLN (4 - Minihydro PLN Project) WILNTT JicaPR_1134 Meseh-2 Nusa Tenggara Timur -8.69532 120.39 9.60 Hydro Inventory Study_1997 WILNTT JicaPR_1186 Mina Nusa Tenggara Timur -10.01030 124.15900 20.70 Hydro Inventory Study_1997 WILNTT JicaPR_1132 Moke Nusa Tenggara Timur -8.74113 120.844 24.60 Hydro Inventory Study_1997 WILNTT Annex I – Updated list of identified potential in NTT, Maluku, Maluku Utara and Sulawesi Page 1 of 6 ID Project Name Province Latitude (WGS84) Longitude (WGS84) Installed Capacity (MW) Source PLN Wilayah hp_0419 Mobuya Sulawesi Utara 0.836074 124.428724 3.00 PLN (3 - Minihydro IPP Project) WILSULUTTENGGO hp_0445 Mongango Gorontalo 0.856911 123.166012 1.20 PLN (4 - Minihydro PLN Project) WILSULUTTENGGO fs_234 PLTA Tina Maluku Utara -3.72383 126.73281 12.00 PLN_wilayah WILMMU JicaPR_1236 Ngodama Maluku Utara 1.52992 127.767 5.50 Hydro Inventory Study_1997 WILMMU JicaPR_1207 Nibe Maluku -3.13427 126.611 33.90 Hydro Inventory Study_1997 WILMMU JicaPR_1138 Noni Nusa Tenggara Timur -9.80533 123.83 7.60 Hydro Inventory Study_1997 WILNTT JicaPR_1114 Nowa Nusa Tenggara Timur -8.55021 119.995 1.10 Hydro Inventory Study_1997 WILNTT JicaPR_1222 Nua Maluku -3.20162 129.09 10.00 Hydro Inventory Study_1997 WILMMU JicaPR_1238 Onat Maluku Utara 1.09537 128.446 13.30 Hydro Inventory Study_1997 WILMMU fs_230 PLTM Iya Gorontalo 0.388858479 123.4728835 2.00 PLN_wilayah WILSULUTTENGGO JicaPR_1234 Paca Maluku Utara 1.56664 127.935 1.60 Hydro Inventory Study_1997 WILMMU hp_0311 Paddumpu Sulawesi Tengah 0.688225 120.2421472 5.00 PLN (3 - Minihydro IPP Project) WILSULUTTENGGO JicaPR_1094 Palame-1 Nusa Tenggara Timur -9.55974 119.796 2.40 Hydro Inventory Study_1997 WILNTT hp_0449 Ranteballa Sulawesi Selatan -3.35944 120.18314 2.40 PLN (3 - Minihydro IPP Project) WILSULSELRABAR JicaPR_1095 Palame-2 Nusa Tenggara Timur -9.50468 119.778 1.80 Hydro Inventory Study_1997 WILNTT JicaPR_1221 Pia Maluku -3.13402 128.96000 10.20 Hydro Inventory Study_1997 WILMMU JicaPR_1112 Parainglala Nusa Tenggara Timur -9.66756 119.513 15.20 Hydro Inventory Study_1997 WILNTT JicaPR_1247 Pastu Ra Maluku Utara -0.53033 127.373 2.30 Hydro Inventory Study_1997 WILMMU JicaPR_1209 Apu Maluku -3.50372 126.889 17.00 Hydro Inventory Study_1997 WILMMU JicaPR_0852 Anagilen Sulawesi Utara 0.872754 123.181 5.20 Hydro Inventory Study_1997 WILSULUTTENGGO hp_0072 Wining Sulawesi Tenggara -5.40235 122.90155 1.60 Consultant WILSULSELRABAR JicaPR_0853 Balaannaitam Sulawesi Utara 0.85090 123.34400 6.60 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0732 Balingara Sulawesi Tengah -1.10704 121.90891 53.69 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0730 Bangketa-1 Sulawesi Tengah -1.12285 122.15312 16.55 Hydro Inventory Study_1997 WILSULUTTENGGO hp_1010 Poigar 1 Sulawesi Utara 0.81560 124.43231 2.40 PLN (4 - Minihydro PLN Project) WILSULUTTENGGO JicaPR_0731 Bangketa-2 Sulawesi Tengah -1.01922 122.11798 41.53 Hydro Inventory Study_1997 WILSULUTTENGGO fs_233 PLTM Goal Maluku Utara -1.212638889 127.5518889 1.95 PLN_wilayah WILMMU fs_242 PLTM Harunda Nusa Tenggara Timur -9.57253 119.86131 1.45 PLN_wilayah WILNTT JicaPR_0736 Batui Sulawesi Tengah -1.19690 122.51100 19.30 Hydro Inventory Study_1997 WILSULUTTENGGO fs_243 PLTM Lapopu-Wanakaka Nusa Tenggara Timur -9.675388889 119.4961944 1.60 PLN_wilayah WILNTT fs_244 PLTM Lokomboro 6 & 7 Nusa Tenggara Timur -9.619822222 119.2932639 0.40 PLN_wilayah WILNTT fs_164 PLTM Wawopada Gorontalo -1.894728278 121.1718041 3.00 PLN_pusat WILSULUTTENGGO fs_241 PLTM Nggongi Nusa Tenggara Timur -10.202022 120.254414 0.03 PLN_wilayah WILNTT JicaPR_0856 Bayau-1 Sulawesi Utara 0.703591 123.581 4.90 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0849 Binontoan Sulawesi Tengah 1.18617 121.04846 29.28 Hydro Inventory Study_1997 WILSULUTTENGGO JicaEX_0113 Bone-2 Gorontalo 0.501115 123.308143 26.60 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0712 Bone-1 Gorontalo 0.537425 123.351 31.10 Hydro Inventory Study_1997 WILSULUTTENGGO fs_215 PLTM Sabuku Gorontalo 0.5327 120.39845 6.00 PLN_wilayah WILSULUTTENGGO JicaPR_0713 Bone-3 Gorontalo 0.60135 123.302 20.90 Hydro Inventory Study_1997 WILSULUTTENGGO fs_228 PLTM Sinombulung Gorontalo 0.530560167 121.1023663 4.00 PLN_wilayah WILSULUTTENGGO fs_177 PLTM Taludaa 2 Gorontalo 0.375884816 123.470612 2.00 PLN_pusat_repository WILSULUTTENGGO fs_238 PLTM Sita Nusa Tenggara Timur -8.752638889 120.5690278 1.00 PLN_wilayah WILNTT JicaPR_0727 Bongka-1 Sulawesi Tengah -1.263371 121.734988 148.34 Hydro Inventory Study_1997 WILSULUTTENGGO fs_227 PLTM Siyuntoyo Gorontalo 0.544031417 121.1369351 3.00 PLN_wilayah WILSULUTTENGGO JicaPR_0728 Bongka-2 Sulawesi Tengah -1.20892 121.58039 193.03 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0711 Bulawa Sulawesi Utara 0.48443 123.566 7.60 Hydro Inventory Study_1997 WILSULUTTENGGO hp_0456 Buleleng Sulawesi Tengah -3.002333333 122.1894444 1.20 PLN (4 - Minihydro PLN Project) WILSULUTTENGGO JicaPR_0714 Bulongo Gorontalo 0.628127 123.089 8.10 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0850 Buol-1 Sulawesi Tengah 1.02076 121.224447 11.29 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0851 Buol-2 Sulawesi Tengah 0.948612 121.16989 26.60 Hydro Inventory Study_1997 WILSULUTTENGGO fs_245 PLTM Umbuwangu 2 Nusa Tenggara Timur -9.599797222 119.1554861 0.20 PLN_wilayah WILNTT fs_236 PLTM Wae Lega Nusa Tenggara Timur -8.542694444 120.3818889 1.75 PLN_wilayah WILNTT JicaPR_0747 Dopi Sulawesi Tengah -2.864618 122.052386 5.54 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0861 Dumoga-2 Sulawesi Utara 0.832007 124.103 35.00 Hydro Inventory Study_1997 WILSULUTTENGGO fs_192 PLTM Sapalewa Maluku Utara -2.925055556 128.4741389 8.00 PLN_pusat WILMMU JicaPR_0858 Gamputa Sulawesi Utara 0.789125 123.542 9.70 Hydro Inventory Study_1997 WILSULUTTENGGO hp_0052 Hanga-hanga Sulawesi Tengah -0.945269 122.768667 2.00 Consultant WILSULUTTENGGO JicaPR_0854 Ilanga-1 Sulawesi Utara 0.683094 123.745 5.90 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0855 Ilanga-2 Sulawesi Utara 0.741612 123.707 18.00 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0744 Karaupa Sulawesi Tengah -2.328537 121.632754 25.65 Hydro Inventory Study_1997 WILSULUTTENGGO hp_0281 Kolori Sulawesi Tengah -1.837533333 120.272425 0.40 PLN (4 - Minihydro PLN Project) WILSULUTTENGGO fs_220 Kuala Kilo Gorontalo -1.294549191 120.5532469 10.00 PLN_wilayah WILSULUTTENGGO fs_221 Kuala Tengah Gorontalo -1.29145261 120.5456025 PLN_wilayah WILSULUTTENGGO JicaPR_1205 Ranu-1 Maluku -3.38189 126.562 17.30 Hydro Inventory Study_1997 WILMMU JicaPR_1123 Rea Nusa Tenggara Timur -8.64966 121.696 2.50 Hydro Inventory Study_1997 WILNTT JicaPR_1129 Ria Nusa Tenggara Timur -8.75075 121.702 4.70 Hydro Inventory Study_1997 WILNTT JicaPR_1130 Ria Mboeli Nusa Tenggara Timur -8.75812 121.86500 1.70 Hydro Inventory Study_1997 WILNTT JicaPR_0734 Labu-2 Sulawesi Tengah -0.805353 122.493 2.80 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0722 Lambunu Sulawesi Tengah 0.547397 120.935831 1.32 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0857 Sangkur/Bayau Sulawesi Utara 0.830293 123.639 21.90 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_1242 Sangaji Maluku Utara 0.723046 128.128 16.90 Hydro Inventory Study_1997 WILMMU hp_0394 Sawidago-3 Sulawesi Tengah -1.751447222 120.693575 1.60 PLN (4 - Minihydro PLN Project) WILSULUTTENGGO fs_178 PLTM Bone Gorontalo 0.502120167 123.270364 7.40 PLN_pusat WILSULUTTENGGO JicaEX_0111 Sitoto Nusa Tenggara Timur -9.47348 123.958 15.24 Hydro Inventory Study_1997 WILNTT JicaPR_1121 Sissa Nusa Tenggara Timur -8.6099 121.225 6.30 Hydro Inventory Study_1997 WILNTT JicaPR_1143 Sttoto Nusa Tenggara Timur -9.47348 123.95800 29.60 Hydro Inventory Study_1997 WILNTT JicaPR_1231 Tahafo Maluku Utara 1.44668 127.588 3.00 Hydro Inventory Study_1997 WILMMU fs_216 PLTM Tabong Gorontalo 0.913412752 121.1611364 7.00 PLN_wilayah WILSULUTTENGGO JicaPR_1223 Tala Maluku -3.30043 128.649 53.10 Hydro Inventory Study_1997 WILMMU JicaPR_1237 Talawi Maluku Utara 0.965435 127.98 21.80 Hydro Inventory Study_1997 WILMMU JicaPR_1139 Taramanu-1 Nusa Tenggara Timur -9.76814 123.814 9.80 Hydro Inventory Study_1997 WILNTT JicaPR_0831 Lariang-1 Sulawesi Tengah -1.79415 120.313 321.70 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0832 Lariang-2 Sulawesi Tengah -1.88251 120.195 254.90 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0833 Lariang-3 Sulawesi Tengah -2.01246 120.2 112.90 Hydro Inventory Study_1997 WILSULUTTENGGO Annex I – Updated list of identified potential in NTT, Maluku, Maluku Utara and Sulawesi Page 2 of 6 ID Project Name Province Latitude (WGS84) Longitude (WGS84) Installed Capacity (MW) Source PLN Wilayah JicaPR_0834 Lariang-4 Sulawesi Tengah -1.95005 120.15500 424.30 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0835 Lariang-5 Sulawesi Tengah -1.65935 120.023 472.80 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_1211 Tina Maluku -3.71546 126.704 23.40 Hydro Inventory Study_1997 WILMMU JicaPR_0836 Lariang-6 Sulawesi Tengah -1.65083 119.869 217.20 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0838 Lariang-8 Sulawesi Tengah -1.91086 120.102 12.90 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0839 Lariang-9 Sulawesi Tengah -1.78414 120.037 12.40 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0745 Larongsangi Sulawesi Tengah -2.712467 121.952817 20.90 Hydro Inventory Study_1997 WILSULUTTENGGO hp_0297 Lelipang Sulawesi Utara 3.486516667 125.5391528 0.60 PLN (4 - Minihydro PLN Project) WILSULUTTENGGO JicaPR_0846 Maraja-1 Sulawesi Tengah 0.878224 120.877755 4.02 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_1184 Tuke Nusa Tenggara Timur -9.92787 124.554 1.40 Hydro Inventory Study_1997 WILNTT JicaPR_0847 Maraja-2 Sulawesi Tengah 0.832471 120.863676 4.29 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0848 Maraja-3 Sulawesi Tengah 0.719212 120.579808 3.61 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0863 Mongondow Sulawesi Utara 0.818936 124.138 20.20 Hydro Inventory Study_1997 WILSULUTTENGGO hp_0353 Waemala Maluku -3.16478 128.79391 2.00 PLN (4 - Minihydro PLN Project) WILMMU JicaPR_1251 Wai Miha Maluku Utara -1.85535 124.68800 8.40 Hydro Inventory Study_1997 WILMMU JicaPR_1117 Wai Naong Nusa Tenggara Timur -8.50598 120.53900 15.50 Hydro Inventory Study_1997 WILNTT JicaPR_1116 Wai Ranjang Nusa Tenggara Timur -8.51533 120.41700 9.30 Hydro Inventory Study_1997 WILNTT JicaPR_1115 Wai Ru Nusa Tenggara Timur -8.50656 120.36700 8.30 Hydro Inventory Study_1997 WILNTT hp_0183 Wai Tina Maluku -3.723472222 126.732325 8.00 PLN (3 - Minihydro IPP Project) WILMMU JicaPR_1104 Waikudu Nusa Tenggara Timur -9.78111 120.115 1.80 Hydro Inventory Study_1997 WILNTT JicaPR_1127 Wajo-1 Nusa Tenggara Timur -8.67160 122.08600 1.50 Hydro Inventory Study_1997 WILNTT JicaPR_1128 Wajo-2 Nusa Tenggara Timur -8.72894 122.02000 2.00 Hydro Inventory Study_1997 WILNTT JicaPR_0864 Mooat Sulawesi Utara 0.77851 124.45500 0.50 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0739 Morowali Sulawesi Tengah -1.67615 121.431052 9.63 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0715 Paguyaman-1 Gorontalo 0.79176 122.24868 4.04 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0716 Paguyaman-2 Gorontalo 0.770679 122.318989 16.61 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_1109 Watumbaka Nusa Tenggara Timur -9.82015 120.39 1.10 Hydro Inventory Study_1997 WILNTT JicaPR_0844 Palu-2 Sulawesi Tengah -1.33034 119.961 21.30 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0845 Palu-2A Sulawesi Tengah -1.27966 119.94700 3.40 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_1113 Watupanggantu Nusa Tenggara Timur -9.61406 119.31800 7.10 Hydro Inventory Study_1997 WILNTT JicaPR_0726 Pandiri Sulawesi Tengah -1.51959 120.766 24.50 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_1249 Wooi Besar-1 Maluku Utara -1.56625 127.884 17.40 Hydro Inventory Study_1997 WILMMU JicaPR_1250 Wooi Besar-2 Maluku Utara -1.62705 127.96 7.60 Hydro Inventory Study_1997 WILMMU JicaPR_0842 Pasangkayu-1 Sulawesi Tengah -1.08941 119.668 18.60 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0843 Pasangkayu-2 Sulawesi Tengah -1.28184 119.61 18.60 Hydro Inventory Study_1997 WILSULUTTENGGO fs_218 PLTM Alani Gorontalo -1.4875 122.8583333 7.00 PLN_wilayah WILSULUTTENGGO fs_219 PLTM Biak Gorontalo -0.88333 122.86667 4.00 PLN_wilayah WILSULUTTENGGO fs_159 PLTM Batu No Botak Gorontalo 0.996247222 120.8912194 5.00 PLN_pusat WILSULUTTENGGO fs_224 PLTM Kabalo Gorontalo -1.45833 121.05091 2.20 PLN_wilayah WILSULUTTENGGO fs_160 PLTM Bongkasoa-Simpoyo Gorontalo -1.12944 121.47218 1.40 PLN_pusat WILSULUTTENGGO fs_161 PLTM Dako Gorontalo 1.08347 120.88933 1.40 PLN_pusat WILSULUTTENGGO fs_210 PLTM Karangana I Gorontalo -1.82874 119.99662 9.00 PLN_wilayah WILSULUTTENGGO fs_211 PLTM Karangana II Gorontalo -1.80533 120.02150 10.00 PLN_wilayah WILSULUTTENGGO fs_212 PLTM Karangana III Gorontalo -1.78000 120.04483 8.50 PLN_wilayah WILSULUTTENGGO fs_162 PLTM Sampaga Gorontalo 0.663055556 120.08194 1.22 PLN_pusat WILSULUTTENGGO fs_163 PLTM Pono Gorontalo -1.539188889 120.0295056 6.07 PLN_pusat WILSULUTTENGGO fs_222 PLTM Lobu Gorontalo -0.85380 122.5220222 5.00 PLN_wilayah WILSULUTTENGGO fs_165 PLTM Yaentu Gorontalo -1.84075 120.86486 10.00 PLN_pusat WILSULUTTENGGO fs_166 PLTM Tomasa Gorontalo -1.67613 120.74639 10.00 PLN_pusat_repository WILSULUTTENGGO fs_213 PLTM Mapahi Gorontalo -1.78014 120.04794 7.00 PLN_wilayah WILSULUTTENGGO fs_223 PLTM Masewo Gorontalo -1.82215 120.00194 8.00 PLN_wilayah WILSULUTTENGGO fs_167 PLTM Bambalo 2 Gorontalo -1.431861111 120.9321111 1.80 PLN_pusat_repository WILSULUTTENGGO fs_168 PLTM Bengkoli Gorontalo 0.6793903 120.1992577 2.50 PLN_pusat_repository WILSULUTTENGGO fs_169 PLTM Ponju Gorontalo 0.59611 120.10167 3.00 PLN_pusat_repository WILSULUTTENGGO fs_170 PLTM Dominanga Gorontalo 0.35811 123.79876 3.50 PLN_pusat WILSULUTTENGGO fs_171 PLTM Ranowano Minahasa Gorontalo 1.36731 124.68664 2.40 PLN_pusat WILSULUTTENGGO fs_172 PLTM Tincep 2 Gorontalo 1.27794 124.74421 1.15 PLN_pusat WILSULUTTENGGO fs_173 PLTM Tincep 3 Gorontalo 1.277288889 124.7396806 2.20 PLN_pusat WILSULUTTENGGO fs_174 PLTM Pidung Gorontalo 0.5196 124.402 2.00 PLN_pusat_repository WILSULUTTENGGO fs_225 PLTM Tinombo Gorontalo 0.449622222 120.2360639 1.70 PLN_wilayah WILSULUTTENGGO fs_229 PLTM Tirtanagaya Gorontalo 0.575078639 120.9429774 PLN_wilayah WILSULUTTENGGO JicaPR_0865 Poigar-1 Sulawesi Utara 0.810621 124.444 6.60 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0866 Poigar-4 Sulawesi Utara 0.969832 124.308 7.40 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0724 Poso-1 Sulawesi Tengah -1.67002 120.654 200.50 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0758 Andolaki-1 Sulawesi Tenggara -3.510456 121.264063 14.60 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0759 Andolaki-2 Sulawesi Tenggara -3.517162 121.269351 7.91 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0760 Andolaki-3 Sulawesi Tenggara -3.57339 121.31464 15.17 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0780 Awo Sulawesi Selatan -3.70426 120.17000 2.10 Hydro Inventory Study_1997 WILSULSELRABAR hp_0089 Ranteangin 8 Sulawesi Tenggara -3.61628 121.09670 1.60 Consultant WILSULSELRABAR JicaPR_0779 Bajo Sulawesi Selatan -3.36809 120.189 1.80 Hydro Inventory Study_1997 WILSULSELRABAR hp_0100 Balambano Sulawesi Selatan -2.644822 121.220092 13.00 Consultant WILSULSELRABAR hp_0235 Baliase Sulawesi Selatan -2.420813889 120.3749028 9.00 PLN (3 - Minihydro IPP Project) WILSULSELRABAR hp_0437 Balla Sulawesi Barat -3.01700 119.31692 0.70 PLN (4 - Minihydro PLN Project) WILSULSELRABAR JicaPR_0786 Batuputi Sulawesi Selatan -4.78268 119.954 11.70 Hydro Inventory Study_1997 WILSULSELRABAR hp_0242 Belajen Sulawesi Selatan -3.313333333 119.8277778 8.30 PLN (3 - Minihydro IPP Project) WILSULSELRABAR hp_0448 Bonehau Sulawesi Barat -2.69072 119.208367 4.00 PLN (4 - Minihydro PLN Project) WILSULSELRABAR JicaPR_0808 Bonto Batu Sulawesi Selatan -3.4687 119.758 235.70 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0827 Budung-1 Sulawesi Barat -1.84379 119.75 27.70 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0828 Budung-2 Sulawesi Barat -1.95523 119.688 31.50 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0829 Budung-3 Sulawesi Barat -2.01121 119.616 14.40 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0830 Budung-4 Sulawesi Barat -1.93751 119.618 14.90 Hydro Inventory Study_1997 WILSULSELRABAR hp_0408 Bungin Sulawesi Selatan -3.528611111 119.9422778 3.00 PLN (3 - Minihydro IPP Project) WILSULSELRABAR JicaPR_0824 Calumpang Sulawesi Barat -2.45523 119.459 356.30 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0788 Cancadi Sulawesi Selatan -4.5624 119.869 12.40 Hydro Inventory Study_1997 WILSULSELRABAR Annex I – Updated list of identified potential in NTT, Maluku, Maluku Utara and Sulawesi Page 3 of 6 ID Project Name Province Latitude (WGS84) Longitude (WGS84) Installed Capacity (MW) Source PLN Wilayah JicaPR_0764 Iwoimenda Sulawesi Tenggara -3.751833 121.25435 8.65 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0798 Jeneberang Sulawesi Selatan -5.28073 119.752 21.00 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0799 Jenetakka Sulawesi Selatan -5.34931 119.66500 6.10 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0770 Kalaena-1 Sulawesi Selatan -2.26881 120.64979 39.50 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0771 Kalaena-2 Sulawesi Selatan -2.33991 120.72092 41.59 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0772 Kalaena-3 Sulawesi Selatan -2.41954 120.77213 53.54 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0790 Kalempang-1 Sulawesi Selatan -3.53241 119.94400 15.30 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0791 Kalempang-2 Sulawesi Selatan -3.68342 119.93000 21.80 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0792 Kalempang-3 Sulawesi Selatan -3.74337 120.06700 7.10 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0822 Kaluku Sulawesi Barat -2.62100 119.15000 35.60 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0823 Karama-1 Sulawesi Selatan -2.3258 119.668 824.70 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0825 Karama-2 Sulawesi Barat -2.40754 119.382 791.60 Hydro Inventory Study_1997 WILSULSELRABAR hp_0116 Karebe Sulawesi Selatan -2.668436 121.185356 14.00 Consultant WILSULSELRABAR JicaPR_0796 Kelarat-1 Sulawesi Selatan -5.54991 119.801 25.20 Hydro Inventory Study_1997 WILSULSELRABAR fs_182 PLTM Bungin 3 Sulawesi Barat -3.519472222 120.0016667 5.00 PLN_pusat_repository WILSULSELRABAR JicaPR_0797 Kelarat-2 Sulawesi Selatan -5.6051 119.748 19.40 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0826 Kerataun Sulawesi Barat -2.55543 119.54400 54.50 Hydro Inventory Study_1997 WILSULSELRABAR hp_0094 Ranteangin 3 Sulawesi Tenggara -3.626563 121.106125 1.30 Consultant WILSULSELRABAR JicaPR_0761 Konaweha-1 Sulawesi Tenggara -3.434928 121.249969 22.17 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0818 Mandar-3 Sulawesi Barat -3.37622 119.018 17.20 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0762 Konaweha-2 Sulawesi Tenggara -3.63942 121.51305 188.95 Hydro Inventory Study_1997 WILSULSELRABAR JicaEX_0082 Konaweha-3 Sulawesi Barat -3.733333333 121.8333333 24.00 Hydro Inventory Study_1997 WILSULSELRABAR hp_0409 Konaweha-4* Sulawesi Tenggara -3.70000 121.75000 26.00 PLN (1 - Masterplan of HEPP Development List) WILSULSELRABAR JicaPR_0748 Lalindu-1 Sulawesi Tenggara -3.011079 121.954221 200.09 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0749 Lalindu-2 Sulawesi Tenggara -3.146164 122.072296 85.90 Hydro Inventory Study_1997 WILSULSELRABAR hp_0093 Ranteangin 4 Sulawesi Tenggara -3.61722 121.09856 3.00 Consultant WILSULSELRABAR JicaPR_0789 Langkana Sulawesi Selatan -4.47713 119.87200 6.60 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0752 Lasolo-3 Sulawesi Tenggara -3.32391 121.72662 11.27 Hydro Inventory Study_1997 WILSULSELRABAR hp_0222 Lapai I Sulawesi Tenggara -3.372638889 121.0570833 4.00 PLN (4 - Minihydro PLN Project) WILSULSELRABAR hp_0221 Lapai II Sulawesi Tenggara -3.33652 121.04297 4.00 PLN (4 - Minihydro PLN Project) WILSULSELRABAR JicaPR_0840 Lariang-10 Sulawesi Barat -1.512300 119.63400 7.00 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0837 Lariang-7 Sulawesi Barat -1.41527 119.64900 639.30 Hydro Inventory Study_1997 WILSULSELRABAR JicaEX_0083 Larona Sulawesi Barat -2.77189 121.329445 165.00 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0750 Lasolo-1 Sulawesi Tenggara -3.15754 121.67825 58.62 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0751 Lasolo-2 Sulawesi Tenggara -3.42487 121.705289 3.42 Hydro Inventory Study_1997 WILSULSELRABAR hp_0092 Ranteangin 5 Sulawesi Tenggara -3.63532 121.07142 4.50 Consultant WILSULSELRABAR JicaEX_0081 Lasolo-4 Sulawesi Barat -3.42629 122.011122 100.00 Hydro Inventory Study_1997 WILSULSELRABAR hp_0042 Lasusua 1 Sulawesi Tenggara -3.54589 120.96619 3.10 Consultant WILSULSELRABAR hp_0041 Lasusua 2 Sulawesi Tenggara -3.53086 120.94267 4.00 Consultant WILSULSELRABAR JicaPR_0821 Malunda Sulawesi Barat -2.96581 118.89800 36.90 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0810 Mamasa-1 Sulawesi Barat -3.09790 119.30400 183.60 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0803 Mamasa-2 Sulawesi Barat -3.11396 119.30900 19.80 Hydro Inventory Study_1997 WILSULSELRABAR hp_0090 Ranteangin 7 Sulawesi Tenggara -3.64216 121.05341 2.10 Consultant WILSULSELRABAR JicaPR_0816 Mandar-1 Sulawesi Barat -3.13924 118.96100 17.80 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0817 Mandar-2 Sulawesi Barat -3.23099 118.99700 19.10 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0807 Mandate Sulawesi Selatan -3.43526 119.80100 203.80 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0820 Manyamba Sulawesi Barat -3.15061 118.86500 13.90 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0812 Mapili-1 Sulawesi Barat -3.04606 119.07600 72.60 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0813 Mapili-2 Sulawesi Barat -3.14412 119.08000 90.60 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0814 Mapili-3 Sulawesi Barat -3.29238 119.11900 55.10 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0800 Maros Sulawesi Selatan -5.16229 119.75900 26.90 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0815 Masuni Sulawesi Barat -3.19018 119.15000 413.30 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0801 Masupu-1 Sulawesi Selatan -3.09842 119.62900 40.50 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0802 Masupu-2 Sulawesi Selatan -3.27303 119.69400 145.00 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0806 Mata Alo-1 Sulawesi Selatan -3.43625 119.94200 9.00 Hydro Inventory Study_1997 WILSULSELRABAR fs_204 PLTM Tomoni Sulawesi Barat -2.47583 120.70611 10.00 PLN_wilayah WILSULSELRABAR JicaPR_0809 Mataalo-3 Sulawesi Selatan -3.54509 119.78700 71.30 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0819 Matana-2 Sulawesi Barat -3.34547 118.99000 6.90 Hydro Inventory Study_1997 WILSULSELRABAR hp_0447 Mikuasi (PLN) Sulawesi Tenggara -3.24549 121.09686 0.50 PLN (4 - Minihydro PLN Project) WILSULSELRABAR JicaPR_0783 Minraleng-2 Sulawesi Selatan -4.82012 119.97900 42.60 Hydro Inventory Study_1997 WILSULSELRABAR fs_231 PLTM Pamoseang Sulawesi Barat -2.99861 119.10339 6.00 PLN_wilayah WILSULSELRABAR JicaPR_0805 Paleleng-2 Sulawesi Selatan -3.48474 119.66100 112.10 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0777 Paramang-1 Sulawesi Selatan -3.19711 120.06300 12.60 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0778 Paramang-2 Sulawesi Selatan -3.26855 120.20500 31.50 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0773 Patikala-1 Sulawesi Selatan -2.34275 120.41080 20.56 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0774 Patikala-2 Sulawesi Selatan -2.43092 120.34821 19.91 Hydro Inventory Study_1997 WILSULSELRABAR hp_0434 Sabilambo Sulawesi Tenggara -4.05728 121.70453 2.00 PLN (4 - Minihydro PLN Project) WILSULSELRABAR fs_232 PLTM Aralle Sulawesi Barat -2.98812 119.06834 8.70 PLN_wilayah WILSULSELRABAR fs_193 PLTM Batukede Sulawesi Barat -3.19112 119.53215 8.85 PLN_wilayah WILSULSELRABAR fs_194 PLTM Benteng Malewang Sulawesi Barat -5.40883 120.03546 5.20 PLN_wilayah WILSULSELRABAR fs_208 PLTM Bontomantene Sulawesi Barat -5.38083 120.10330 2.22 PLN_wilayah WILSULSELRABAR fs_207 PLTM Bungin 2 Sulawesi Barat -3.51406 119.90036 10.00 PLN_wilayah WILSULSELRABAR fs_201 PLTM Datara Sulawesi Barat -5.44856 119.79539 9.50 PLN_wilayah WILSULSELRABAR fs_202 PLTM Kadundung Sulawesi Barat -3.38590 120.16330 3.20 PLN_wilayah WILSULSELRABAR fs_209 PLTM Kindang Sulawesi Barat -5.40883 120.03546 3.50 PLN_wilayah WILSULSELRABAR fs_205 PLTM Kindang 2 Sulawesi Barat -5.35028 120.06389 3.00 PLN_wilayah WILSULSELRABAR fs_195 PLTM Ma'dong Sulawesi Barat -2.95261 119.80867 10.00 PLN_wilayah WILSULSELRABAR fs_198 PLTM Maiting Hulu 2 Sulawesi Barat -2.86501 119.84459 8.00 PLN_wilayah WILSULSELRABAR fs_196 PLTM Patikala Sulawesi Barat -2.45269 120.40989 6.00 PLN_wilayah WILSULSELRABAR fs_203 PLTM Paun Sulawesi Barat -3.20373 119.54412 9.20 PLN_wilayah WILSULSELRABAR hp_0438 Rongi Sulawesi Tenggara -5.529794 122.739031 0.80 PLN (4 - Minihydro PLN Project) WILSULSELRABAR fs_206 PLTM Rongkong 3 Sulawesi Barat -2.566284915 119.9880363 7.60 PLN_wilayah WILSULSELRABAR fs_199 PLTM Sapaya Sulawesi Barat -5.338175 119.7035194 5.20 PLN_wilayah WILSULSELRABAR fs_179 PLTM Dusun Palantieng Sulawesi Barat -4.85 120.3166667 4.00 PLN_pusat WILSULSELRABAR Annex I – Updated list of identified potential in NTT, Maluku, Maluku Utara and Sulawesi Page 4 of 6 ID Project Name Province Latitude (WGS84) Longitude (WGS84) Installed Capacity (MW) Source PLN Wilayah fs_180 PLTM Kahaya Sulawesi Barat -5.323333333 120.0039111 3.00 PLN_pusat WILSULSELRABAR hp_0436 Rongkong Sulawesi Selatan -2.615975 120.094831 8.10 PLN (3 - Minihydro IPP Project) WILSULSELRABAR fs_181 PLTMH Eremerasa Sulawesi Barat -5.470194444 120.0155139 1.30 PLN_pusat WILSULSELRABAR fs_183 PLTM Saluanoa Sulawesi Barat -2.338686111 120.7916667 2.00 PLN_pusat_repository WILSULSELRABAR fs_184 PLTM Pasui 2 Sulawesi Barat -3.43547 119.89486 6.40 PLN_pusat_repository WILSULSELRABAR fs_185 PLTM Mallawa Sulawesi Barat -4.82222 119.88222 5.00 PLN_pusat_repository WILSULSELRABAR fs_186 PLTM Tombolo Pao Sulawesi Barat -5.188611111 119.94 2.00 PLN_pusat_repository WILSULSELRABAR fs_187 PLTM Bantaeng 1 Sulawesi Barat -5.387033333 120.0121861 4.20 PLN_pusat_repository WILSULSELRABAR fs_217 PLTM Tomata Sulawesi Barat -2.254166667 120.9527778 10.00 PLN_wilayah WILSULSELRABAR fs_188 PLTM Malua Sulawesi Barat -3.29806 119.94761 4.60 PLN_pusat_repository WILSULSELRABAR fs_189 PLTM Kondongan Sulawesi Barat -3.02975 119.73861 3.45 PLN_pusat_repository WILSULSELRABAR fs_190 PLTM Pongbatik Sulawesi Barat -2.988805556 119.69261 3.00 PLN_pusat_repository WILSULSELRABAR JicaEX_0087 Poko Sulawesi Barat -3.43333 119.5833333 233.00 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0767 Pongkeru-1 Sulawesi Tenggara -3.12768 121.30529 100.47 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0784 Walimpong Sulawesi Selatan -4.50931 120.00000 46.70 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0768 Pongkeru-2 Sulawesi Selatan -2.94501 121.24547 46.86 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0769 Pongkeru-3 Sulawesi Selatan -2.79922 121.18741 235.11 Hydro Inventory Study_1997 WILSULSELRABAR hp_0096 Ranteangin 1 Sulawesi Tenggara -3.63282 121.13919 2.00 Consultant WILSULSELRABAR hp_0095 Ranteangin 2 Sulawesi Tenggara -3.63243 121.11635 2.00 Consultant WILSULSELRABAR JicaPR_0811 Rentelemo Sulawesi Barat -2.92989 119.216 6.70 Hydro Inventory Study_1997 WILSULSELRABAR hp_0401 Riorita Sulawesi Tenggara -3.122777778 121.1327778 1.00 PLN (4 - Minihydro PLN Project) WILSULSELRABAR JicaPR_0775 Rongkong-1 Sulawesi Selatan -2.544673 120.137684 18.21 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0776 Rongkong-2 Sulawesi Selatan -2.58591 120.02389 22.30 Hydro Inventory Study_1997 WILSULSELRABAR hp_0335 Simbuang Sulawesi Selatan -2.864361111 120.0396667 3.00 PLN (3 - Minihydro IPP Project) WILSULSELRABAR hp_0141 Siteba Sulawesi Selatan -2.779882545 120.1026734 7.50 PLN (3 - Minihydro IPP Project) WILSULSELRABAR JicaPR_0781 Siwa Sulawesi Selatan -3.64996 120.27700 1.40 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0804 Soreang Sulawesi Selatan -3.31169 119.45500 833.00 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0763 Tamboli Sulawesi Tenggara -3.88006 121.35300 21.35 Hydro Inventory Study_1997 WILSULSELRABAR hp_0118 Tangka/Manippi Sulawesi Selatan -5.199759 120.023517 10.00 PLN (3 - Minihydro IPP Project) WILSULSELRABAR JicaPR_0793 Tangkak-1 Sulawesi Selatan -5.19107 120.048 8.90 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0795 Tangkak-3 Sulawesi Selatan -5.07425 120.088 34.40 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0753 Toma-1 Sulawesi Tenggara -3.470371 121.544545 2.81 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0754 Toma-2 Sulawesi Tenggara -3.55711 121.54456 2.52 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0755 Toma-3 Sulawesi Tenggara -3.476059 121.622785 2.66 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0756 Toma-4 Sulawesi Tenggara -3.589815 121.661485 5.44 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0757 Toma-5 Sulawesi Tenggara -3.655225 121.602881 33.87 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0787 Urapat Sulawesi Selatan -4.6057 119.85 23.90 Hydro Inventory Study_1997 WILSULSELRABAR hp_0352 Ussu Malili Sulawesi Selatan -2.552777778 121.1055556 3.00 PLN (3 - Minihydro IPP Project) WILSULSELRABAR JicaPR_0719 Randangan-3 Gorontalo 0.726881 121.676725 77.19 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0765 Watunohu-1 Sulawesi Tenggara -3.396286 121.095037 58.57 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0766 Watunohu-2 Sulawesi Tenggara -3.373451 121.079133 17.60 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0725 Poso-2 Sulawesi Tengah -1.61372 120.698 136.50 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0717 Randangan-1 Gorontalo 0.703935 121.910705 17.81 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0718 Randangan-2 Gorontalo 0.681099 121.882636 5.58 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0720 Randangan-4 Gorontalo 0.661779 121.734799 39.53 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0868 Ranoyapo-2 Sulawesi Utara 1.13352 124.584 29.00 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0869 Sawangan Sulawesi Utara 1.35016 124.947 9.20 Hydro Inventory Study_1997 WILSULUTTENGGO hp_0367 Sawidago-1 #1 Sulawesi Tengah -1.744316667 120.6742944 0.38 PLN (4 - Minihydro PLN Project) WILSULUTTENGGO JicaPR_0746 Siumbatu Sulawesi Tengah -2.780721 121.982684 9.50 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0737 Solato-1 Sulawesi Tengah -1.576029 121.596195 26.94 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0738 Solato-2 Sulawesi Tengah -1.695472 121.654175 31.20 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0740 Sumara Sulawesi Tengah -1.701452 121.308408 8.22 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0729 Taima Sulawesi Tengah -0.820643 122.378 2.10 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0741 Tambalako-1 Sulawesi Tengah -2.275923 121.13772 18.12 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0742 Tambalako-2 Sulawesi Tengah -2.248907 121.221633 25.06 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0743 Tambalako-3 Sulawesi Tengah -2.277345 121.341133 38.70 Hydro Inventory Study_1997 WILSULUTTENGGO JicaEX_0094 Tanggari-1 Gorontalo 1.32245 124.925 16.60 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0721 Tuladengi Sulawesi Tengah 0.513963 121.094219 18.42 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_0862 Toadon Sulawesi Utara 0.815091 124.205 1.50 Hydro Inventory Study_1997 WILSULUTTENGGO JicaEX_0095 Tonsea Lama Gorontalo 1.29867 124.925 14.38 Hydro Inventory Study_1997 WILSULUTTENGGO JicaEX_0093 Tanggari-2 Gorontalo 1.33664 124.934 19.00 Hydro Inventory Study_1997 WILSULUTTENGGO JicaEX_0092 Poigar-3 Gorontalo 0.878193 124.387272 13.54 Hydro Inventory Study_1997 WILSULUTTENGGO JicaEX_0091 Poigar-2 Gorontalo 0.858475 124.411351 25.38 Hydro Inventory Study_1997 WILSULUTTENGGO JicaEX_0090 Palu-3 Gorontalo -1.285259 120.110732 74.80 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_1177 Benain-1 Nusa Tenggara Timur -9.71755 124.462 10.20 Hydro Inventory Study_1997 WILNTT JicaEX_0084 Bili-Bili Sulawesi Barat -5.279 119.585 11.20 Hydro Inventory Study_1997 WILSULSELRABAR JicaEX_0089 Bakaru (2nd Stage) Sulawesi Barat -3.463085 119.63707 126.00 Hydro Inventory Study_1997 WILSULSELRABAR JicaEX_0088 Bakaru (1st Stage) Sulawesi Barat -3.45417 119.62300 126.00 Hydro Inventory Study_1997 WILSULSELRABAR JicaEX_0086 Batu Sulawesi Barat -3.42761 119.71149 271.00 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_1240 Akelamo-2 Maluku Utara 1.39329 128.59400 11.00 Hydro Inventory Study_1997 WILMMU JicaPR_0859 Ayoung Sulawesi Utara 0.79131 123.91500 8.60 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_1179 Benain-2 Nusa Tenggara Timur -9.56739 124.84100 4.00 Hydro Inventory Study_1997 WILNTT JicaPR_1180 Benain-2A Nusa Tenggara Timur -9.55657 124.831 37.10 Hydro Inventory Study_1997 WILNTT JicaPR_0860 Dumoga-1 Sulawesi Utara 0.581782 123.852 11.80 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_1210 Garen Maluku -3.34027 126.83700 10.70 Hydro Inventory Study_1997 WILMMU JicaPR_1245 Kasiruta Maluku Utara -0.458707 127.199 2.40 Hydro Inventory Study_1997 WILMMU JicaPR_1108 Kambera-4 Nusa Tenggara Timur -9.76889 120.24900 10.60 Hydro Inventory Study_1997 WILNTT JicaPR_1141 Kapsali Nusa Tenggara Timur -9.70874 123.79800 5.20 Hydro Inventory Study_1997 WILNTT JicaPR_1217 Kina Maluku -2.91544 128.742 8.20 Hydro Inventory Study_1997 WILMMU JicaPR_0870 Kuwil Sulawesi Utara 1.4511 124.921 9.70 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_1131 Lake Nusa Tenggara Timur -8.64437 120.801 4.90 Hydro Inventory Study_1997 WILNTT JicaPR_1235 Lamo Maluku Utara 1.56896 127.785 12.10 Hydro Inventory Study_1997 WILMMU JicaPR_1233 Lamo-2 Maluku Utara 1.15772 127.51700 2.10 Hydro Inventory Study_1997 WILMMU JicaPR_1226 Loehoe Maluku -3.65587 128.20700 0.90 Hydro Inventory Study_1997 WILMMU Annex I – Updated list of identified potential in NTT, Maluku, Maluku Utara and Sulawesi Page 5 of 6 ID Project Name Province Latitude (WGS84) Longitude (WGS84) Installed Capacity (MW) Source PLN Wilayah JicaPR_1215 Mala-1 Maluku -3.02508 128.46300 28.80 Hydro Inventory Study_1997 WILMMU JicaPR_1213 Mala-2 Maluku -3.66917 126.38900 12.70 Hydro Inventory Study_1997 WILMMU JicaPR_1216 Mala-2 Maluku -2.93029 128.471 31.20 Hydro Inventory Study_1997 WILMMU JicaPR_1181 Menu-1 Nusa Tenggara Timur -9.84369 124.648 1.20 Hydro Inventory Study_1997 WILNTT JicaPR_1142 Metan Nusa Tenggara Timur -9.64835 123.732 26.80 Hydro Inventory Study_1997 WILNTT JicaPR_1187 Mina Alt Nusa Tenggara Timur -10.0211 124.15 37.40 Hydro Inventory Study_1997 WILNTT JicaPR_0782 Minraleng-1 Sulawesi Selatan -4.87933 119.93000 31.90 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_0785 Mong Sulawesi Selatan -4.47515 120.01600 264.00 Hydro Inventory Study_1997 WILSULSELRABAR JicaPR_1183 Muke Nusa Tenggara Timur -9.97643 124.411 0.50 Hydro Inventory Study_1997 WILNTT JicaPR_1246 Paisu Sajgang Maluku Utara -0.57075 127.56100 2.20 Hydro Inventory Study_1997 WILMMU JicaPR_0867 Ranoyapo-1 Sulawesi Utara 1.02499 124.532 12.50 Hydro Inventory Study_1997 WILSULUTTENGGO JicaPR_1206 Ranu-2 Maluku -3.34719 126.572 6.50 Hydro Inventory Study_1997 WILMMU JicaPR_1107 Rita Nusa Tenggara Timur -9.83968 120.218 8.20 Hydro Inventory Study_1997 WILNTT Annex I – Updated list of identified potential in NTT, Maluku, Maluku Utara and Sulawesi Page 6 of 6 ANNEX II – DEMAND FORECAST RESULTS Sulawesi demand forecast results District ID Province Regency District habitants/household Population # Households Energy demand (GWh) Peak demand (MW) 7101021 Sulawesi Utara Bolaang Mongondow Dumoga Barat 4.25 31 576 7 434 10.20 1.87 7101022 Sulawesi Utara Bolaang Mongondow Dumoga Utara 3.88 25 492 6 574 9.02 1.65 7101023 Sulawesi Utara Bolaang Mongondow Dumoga Timur 4.07 38 257 9 407 12.91 2.36 7101060 Sulawesi Utara Bolaang Mongondow Lolayan 4.42 27 473 6 212 8.53 1.56 7101081 Sulawesi Utara Bolaang Mongondow Passi Barat 4.55 17 802 3 917 5.38 0.98 7101082 Sulawesi Utara Bolaang Mongondow Passi Timur 3.97 13 408 3 377 4.64 0.85 7101083 Sulawesi Utara Bolaang Mongondow Bilalang 4.28 7 212 1 685 2.31 0.42 7101090 Sulawesi Utara Bolaang Mongondow Poigar 3.79 20 280 5 346 7.34 1.34 7101100 Sulawesi Utara Bolaang Mongondow Bolaang 4.43 20 411 4 603 6.32 1.15 7101101 Sulawesi Utara Bolaang Mongondow Bolaang Timur 4.19 11 440 2 730 3.75 0.68 7101110 Sulawesi Utara Bolaang Mongondow Lolak 4.25 29 457 6 930 9.51 1.74 7101120 Sulawesi Utara Bolaang Mongondow Sangtombolang 4.10 11 378 2 774 3.81 0.70 7102091 Sulawesi Utara Minahasa Langowan Timur 3.41 14 550 4 263 5.85 1.07 7102092 Sulawesi Utara Minahasa Langowan Barat 3.42 18 030 5 266 7.23 1.32 7102093 Sulawesi Utara Minahasa Langowan Selatan 3.38 8 879 2 625 3.60 0.66 7102094 Sulawesi Utara Minahasa Langowan Utara 3.15 9 514 3 018 4.14 0.76 7102110 Sulawesi Utara Minahasa Tompaso 3.83 18 048 4 708 6.46 1.18 7102120 Sulawesi Utara Minahasa Kawangkoan 3.69 30 843 8 361 11.48 2.10 7102130 Sulawesi Utara Minahasa Sonder 3.67 20 840 5 675 7.79 1.42 7102160 Sulawesi Utara Minahasa Tombariri 3.73 30 541 8 178 11.23 2.05 7102170 Sulawesi Utara Minahasa Pineleng 4.05 53 673 13 237 18.17 3.32 7102171 Sulawesi Utara Minahasa Tombulu 3.67 17 887 4 870 6.69 1.22 7102190 Sulawesi Utara Minahasa Tondano Barat 4.08 22 458 5 501 7.55 1.38 7102191 Sulawesi Utara Minahasa Tondano Selatan 2.82 23 475 8 333 11.44 2.09 7102200 Sulawesi Utara Minahasa Remboken 3.85 13 090 3 402 4.67 0.85 7102210 Sulawesi Utara Minahasa Kakas 3.50 25 255 7 217 9.91 1.81 7102220 Sulawesi Utara Minahasa Lembean Timur 3.45 8 958 2 594 3.56 0.65 7102230 Sulawesi Utara Minahasa Eris 3.71 11 826 3 187 4.37 0.80 7102240 Sulawesi Utara Minahasa Kombi 3.45 11 948 3 466 4.76 0.87 7102250 Sulawesi Utara Minahasa Tondano Timur 4.00 16 398 4 101 5.63 1.03 7102251 Sulawesi Utara Minahasa Tondano Utara 4.06 13 349 3 288 4.51 0.82 7103040 Sulawesi Utara Kepulauan Sangihe Manganitu Selatan 3.82 11 790 3 086 4.24 0.77 7103041 Sulawesi Utara Kepulauan Sangihe Tatoareng 3.65 5 189 1 421 1.95 0.36 7103050 Sulawesi Utara Kepulauan Sangihe Tamako 3.74 15 468 4 136 5.68 1.04 7103060 Sulawesi Utara Kepulauan Sangihe Tabukan Selatan 3.78 6 978 1 847 2.54 0.46 7103061 Sulawesi Utara Kepulauan Sangihe Tabukan Selatan Tengah 3.41 3 225 945 1.30 0.24 7103062 Sulawesi Utara Kepulauan Sangihe Tabukan Selatan Tenggara 3.64 2 509 690 0.95 0.17 7103070 Sulawesi Utara Kepulauan Sangihe Tabukan Tengah 3.81 12 260 3 218 4.42 0.81 7103080 Sulawesi Utara Kepulauan Sangihe Manganitu 3.78 16 555 4 379 6.01 1.10 7103090 Sulawesi Utara Kepulauan Sangihe Tahuna 3.91 18 989 4 851 6.66 1.22 7103091 Sulawesi Utara Kepulauan Sangihe Tahuna Timur 3.96 14 737 3 719 5.11 0.93 7103092 Sulawesi Utara Kepulauan Sangihe Tahuna Barat 3.76 6 481 1 723 2.37 0.43 7103100 Sulawesi Utara Kepulauan Sangihe Tabukan Utara 3.84 23 161 6 025 8.27 1.51 7103101 Sulawesi Utara Kepulauan Sangihe Nusa Tabukan 3.75 3 476 927 1.27 0.23 7103102 Sulawesi Utara Kepulauan Sangihe Kepulauan Marore 3.96 1 633 413 0.57 0.10 7103110 Sulawesi Utara Kepulauan Sangihe Kendahe 3.82 7 696 2 013 2.76 0.51 7104010 Sulawesi Utara Kepulauan Talaud Kabaruan 3.90 6 516 1 671 2.29 0.42 7104011 Sulawesi Utara Kepulauan Talaud Damau 3.75 4 914 1 310 1.80 0.33 7104020 Sulawesi Utara Kepulauan Talaud Lirung 4.33 7 307 1 689 2.32 0.42 7104021 Sulawesi Utara Kepulauan Talaud Salibabu 3.92 6 628 1 690 2.32 0.42 7104022 Sulawesi Utara Kepulauan Talaud Kalongan 3.84 3 644 948 1.30 0.24 7104023 Sulawesi Utara Kepulauan Talaud Moronge 3.85 4 174 1 085 1.49 0.27 7104030 Sulawesi Utara Kepulauan Talaud Melonguane 4.00 12 458 3 115 4.28 0.78 7104031 Sulawesi Utara Kepulauan Talaud Melonguane Timur 3.78 3 530 935 1.28 0.23 7104040 Sulawesi Utara Kepulauan Talaud Beo 4.08 6 574 1 612 2.21 0.40 7104041 Sulawesi Utara Kepulauan Talaud Beo Utara 4.15 4 297 1 035 1.42 0.26 7104042 Sulawesi Utara Kepulauan Talaud Beo Selatan 4.39 4 138 942 1.29 0.24 7104050 Sulawesi Utara Kepulauan Talaud Rainis 4.24 7 095 1 676 2.30 0.42 7104051 Sulawesi Utara Kepulauan Talaud Tampa Na'mma 4.44 6 545 1 476 2.03 0.37 7104052 Sulawesi Utara Kepulauan Talaud Pulutan 3.71 2 326 628 0.86 0.16 7104060 Sulawesi Utara Kepulauan Talaud Essang 4.62 4 045 876 1.20 0.22 7104061 Sulawesi Utara Kepulauan Talaud Essang Selatan 4.47 3 808 852 1.17 0.21 7104070 Sulawesi Utara Kepulauan Talaud Gemeh 4.05 6 513 1 610 2.21 0.40 7104080 Sulawesi Utara Kepulauan Talaud Nanusa 4.03 3 969 986 1.35 0.25 7104081 Sulawesi Utara Kepulauan Talaud Miangas 4.31 867 202 0.28 0.05 7105010 Sulawesi Utara Minahasa Selatan Modoinding 3.47 13 483 3 883 5.33 0.97 7105020 Sulawesi Utara Minahasa Selatan Tompaso Baru 3.71 14 007 3 775 5.18 0.95 7105021 Sulawesi Utara Minahasa Selatan Maesaan 3.52 11 570 3 292 4.52 0.83 7105070 Sulawesi Utara Minahasa Selatan Ranoyapo 3.59 14 088 3 921 5.38 0.98 7105080 Sulawesi Utara Minahasa Selatan Motoling 3.63 8 562 2 360 3.24 0.59 7105081 Sulawesi Utara Minahasa Selatan Kumelembuai 3.57 7 918 2 219 3.05 0.56 7105082 Sulawesi Utara Minahasa Selatan Motoling Barat 3.68 9 122 2 482 3.41 0.62 7105083 Sulawesi Utara Minahasa Selatan Motoling Timur 3.44 10 327 3 005 4.13 0.75 7105090 Sulawesi Utara Minahasa Selatan Sinonsayang 3.84 18 102 4 719 6.48 1.18 7105100 Sulawesi Utara Minahasa Selatan Tenga 3.77 20 460 5 432 7.46 1.36 7105111 Sulawesi Utara Minahasa Selatan Amurang 4.04 19 360 4 788 6.57 1.20 7105112 Sulawesi Utara Minahasa Selatan Amurang Barat 3.76 17 738 4 721 6.48 1.18 7105113 Sulawesi Utara Minahasa Selatan Amurang Timur 3.85 16 157 4 196 5.76 1.05 7105120 Sulawesi Utara Minahasa Selatan Tareran 3.60 14 442 4 014 5.51 1.01 7105121 Sulawesi Utara Minahasa Selatan Sulta 3.26 8 452 2 592 3.56 0.65 7105130 Sulawesi Utara Minahasa Selatan Tumpaan 3.82 18 377 4 810 6.60 1.21 7105131 Sulawesi Utara Minahasa Selatan Tatapaan 3.78 10 674 2 823 3.88 0.71 7106010 Sulawesi Utara Minahasa Utara Kema 3.95 17 871 4 522 6.21 1.13 Annex II – Demand forecast results Page 1 of 12 District ID Province Regency District habitants/household Population # Households Energy demand (GWh) Peak demand (MW) 7106020 Sulawesi Utara Minahasa Utara Kauditan 3.77 28 123 7 455 10.23 1.87 7106030 Sulawesi Utara Minahasa Utara Airmadidi 3.80 31 621 8 312 11.41 2.09 7106040 Sulawesi Utara Minahasa Utara Kalawat 3.87 31 761 8 197 11.25 2.06 7106050 Sulawesi Utara Minahasa Utara Dimembe 3.80 27 116 7 146 9.81 1.79 7106051 Sulawesi Utara Minahasa Utara Talawaan 3.60 21 048 5 844 8.02 1.47 7106060 Sulawesi Utara Minahasa Utara Wori 3.81 21 408 5 616 7.71 1.41 7106070 Sulawesi Utara Minahasa Utara Likupang Barat 4.25 20 227 4 763 6.54 1.20 7106080 Sulawesi Utara Minahasa Utara Likupang Timur 3.85 19 668 5 112 7.02 1.28 7106081 Sulawesi Utara Minahasa Utara Likupang Selatan 3.80 6 076 1 601 2.20 0.40 7107010 Sulawesi Utara Bolaang Mongondow Utara Sangkub 4.06 10 604 2 614 3.59 0.66 7107020 Sulawesi Utara Bolaang Mongondow Utara Bintauna 3.67 15 067 4 101 5.63 1.03 7107030 Sulawesi Utara Bolaang Mongondow Utara Bolang Itang Timur 4.10 15 311 3 732 5.12 0.94 7107040 Sulawesi Utara Bolaang Mongondow Utara Bolang Itang Barat 4.36 16 719 3 832 5.26 0.96 7107050 Sulawesi Utara Bolaang Mongondow Utara Kaidipang 4.19 14 686 3 508 4.82 0.88 7107060 Sulawesi Utara Bolaang Mongondow Utara Pinogaluman 4.08 11 785 2 887 3.96 0.72 7108010 Sulawesi Utara Siau Tagulandang Biaro Biaro 3.95 3 868 979 1.34 0.25 7108020 Sulawesi Utara Siau Tagulandang Biaro Tagulandang Selatan 3.85 4 967 1 290 1.77 0.32 7108030 Sulawesi Utara Siau Tagulandang Biaro Tagulandang 3.84 13 808 3 594 4.93 0.90 7108040 Sulawesi Utara Siau Tagulandang Biaro Tagulandang Utara 3.90 4 795 1 229 1.69 0.31 7108050 Sulawesi Utara Siau Tagulandang Biaro Siau Barat Selatan 3.85 4 850 1 260 1.73 0.32 7108060 Sulawesi Utara Siau Tagulandang Biaro Siau Timur Selatan 3.77 8 672 2 299 3.16 0.58 7108070 Sulawesi Utara Siau Tagulandang Biaro Siau Barat 3.67 9 346 2 547 3.50 0.64 7108080 Sulawesi Utara Siau Tagulandang Biaro Siau Tengah 4.05 2 203 545 0.75 0.14 7108090 Sulawesi Utara Siau Tagulandang Biaro Siau Timur 3.74 18 831 5 037 6.91 1.26 7108100 Sulawesi Utara Siau Tagulandang Biaro Siau Barat Utara 3.64 4 628 1 271 1.74 0.32 7109010 Sulawesi Utara Minahasa Tenggara Ratatotok 3.93 14 427 3 676 5.05 0.92 7109020 Sulawesi Utara Minahasa Tenggara Pusomaen 3.90 9 786 2 513 3.45 0.63 7109030 Sulawesi Utara Minahasa Tenggara Belang 4.12 18 127 4 402 6.04 1.10 7109040 Sulawesi Utara Minahasa Tenggara Ratahan 3.88 14 483 3 732 5.12 0.94 7109041 Sulawesi Utara Minahasa Tenggara Pasan 3.71 7 852 2 115 2.90 0.53 7109042 Sulawesi Utara Minahasa Tenggara Ratahan Timur 3.68 6 606 1 797 2.47 0.45 7109050 Sulawesi Utara Minahasa Tenggara Tombatu 4.19 10 726 2 563 3.52 0.64 7109051 Sulawesi Utara Minahasa Tenggara Tombatu Timur 3.65 10 052 2 755 3.78 0.69 7109052 Sulawesi Utara Minahasa Tenggara Tombatu Utara 3.93 9 137 2 327 3.19 0.58 7109060 Sulawesi Utara Minahasa Tenggara Touluaan 3.98 7 403 1 859 2.55 0.47 7109061 Sulawesi Utara Minahasa Tenggara Touluaan Selatan 3.86 4 857 1 258 1.73 0.32 7109062 Sulawesi Utara Minahasa Tenggara Silian Raya 4.13 6 141 1 488 2.04 0.37 7110010 Sulawesi Utara Bolaang Mongondow Selatan Posigadan 4.31 19 580 4 546 6.24 1.14 7110020 Sulawesi Utara Bolaang Mongondow Selatan Bolang Uki 4.24 23 373 5 507 7.56 1.38 7110030 Sulawesi Utara Bolaang Mongondow Selatan Pinolosian 4.25 10 792 2 543 3.49 0.64 7110040 Sulawesi Utara Bolaang Mongondow Selatan Pinolosian Tengah 4.13 6 101 1 477 2.03 0.37 7110050 Sulawesi Utara Bolaang Mongondow Selatan Pinolosian Timur 4.10 8 023 1 959 2.69 0.49 7111010 Sulawesi Utara Bolaang Mongondow Timur Nuangan 4.17 15 401 3 690 5.07 0.93 7111020 Sulawesi Utara Bolaang Mongondow Timur Tutuyan 4.18 13 364 3 196 4.39 0.80 7111030 Sulawesi Utara Bolaang Mongondow Timur Kotabunan 4.46 13 101 2 939 4.03 0.74 7111040 Sulawesi Utara Bolaang Mongondow Timur Modayag 4.05 22 162 5 472 7.51 1.37 7111050 Sulawesi Utara Bolaang Mongondow Timur Modayag Barat 4.33 11 763 2 719 3.73 0.68 7171010 Sulawesi Utara Manado Malalayang 3.52 65 436 18 598 25.53 4.67 7171020 Sulawesi Utara Manado Sario 3.27 27 621 8 457 11.61 2.12 7171021 Sulawesi Utara Manado Wanea 3.85 67 821 17 609 24.17 4.42 7171030 Sulawesi Utara Manado Wenang 3.72 39 048 10 488 14.40 2.63 7171031 Sulawesi Utara Manado Tikala 4.10 83 028 20 227 27.77 5.07 7171040 Sulawesi Utara Manado Mapanget 3.87 63 335 16 349 22.44 4.10 7171051 Sulawesi Utara Manado Singkil 4.09 55 628 13 598 18.67 3.41 7171052 Sulawesi Utara Manado Tuminting 4.16 62 019 14 926 20.49 3.74 7171053 Sulawesi Utara Manado Bunaken 3.90 24 799 6 362 8.73 1.60 7172010 Sulawesi Utara Bitung Madidir 3.89 39 865 10 261 14.09 2.57 7172011 Sulawesi Utara Bitung Matuari 3.97 32 362 8 160 11.20 2.05 7172012 Sulawesi Utara Bitung Girian 4.10 33 174 8 084 11.10 2.03 7172021 Sulawesi Utara Bitung Lembeh Selatan 4.25 10 859 2 558 3.51 0.64 7172022 Sulawesi Utara Bitung Lembeh Utara 4.03 10 132 2 513 3.45 0.63 7172030 Sulawesi Utara Bitung Aertembaga 4.24 33 650 7 943 10.90 1.99 7172031 Sulawesi Utara Bitung Maesa 4.22 42 871 10 155 13.94 2.55 7172040 Sulawesi Utara Bitung Ranowulu 4.14 20 515 4 957 6.80 1.24 7173010 Sulawesi Utara Tomohon Tomohon Selatan 3.76 25 078 6 672 9.16 1.67 7173020 Sulawesi Utara Tomohon Tomohon Tengah 3.94 23 999 6 092 8.36 1.53 7173021 Sulawesi Utara Tomohon Tomohon Timur 3.85 12 227 3 180 4.37 0.80 7173022 Sulawesi Utara Tomohon Tomohon Barat 4.09 16 860 4 123 5.66 1.03 7173030 Sulawesi Utara Tomohon Tomohon Utara 3.99 30 845 7 736 10.62 1.94 7174010 Sulawesi Utara Kotamobagu Kotamobagu Selatan 4.35 33 374 7 674 10.53 1.93 7174020 Sulawesi Utara Kotamobagu Kotamobagu Timur 4.02 31 380 7 805 10.71 1.96 7174030 Sulawesi Utara Kotamobagu Kotamobagu Barat 3.96 44 861 11 316 15.53 2.84 7174040 Sulawesi Utara Kotamobagu Kotamobagu Utara 4.39 18 331 4 176 5.73 1.05 7201010 Sulawesi Tengah Banggai Kepulauan Labobo 3.85 6 888 1 791 2.03 0.41 7201011 Sulawesi Tengah Banggai Kepulauan Bokan Kepulauan 4.04 14 922 3 693 4.18 0.85 7201012 Sulawesi Tengah Banggai Kepulauan Bangkurung 4.08 10 570 2 593 2.94 0.60 7201020 Sulawesi Tengah Banggai Kepulauan Banggai 4.26 25 763 6 053 6.85 1.40 7201021 Sulawesi Tengah Banggai Kepulauan Banggai Utara 3.88 7 747 1 997 2.26 0.46 7201022 Sulawesi Tengah Banggai Kepulauan Banggai Tengah 3.92 8 205 2 091 2.37 0.48 7201023 Sulawesi Tengah Banggai Kepulauan Banggai Selatan 4.11 6 202 1 511 1.71 0.35 7201030 Sulawesi Tengah Banggai Kepulauan Totikum 3.94 12 728 3 230 3.66 0.74 7201031 Sulawesi Tengah Banggai Kepulauan Totikum Selatan 4.01 10 364 2 582 2.92 0.60 7201040 Sulawesi Tengah Banggai Kepulauan Tinangkung 3.93 17 025 4 330 4.90 1.00 Annex II – Demand forecast results Page 2 of 12 District ID Province Regency District habitants/household Population # Households Energy demand (GWh) Peak demand (MW) 7201041 Sulawesi Tengah Banggai Kepulauan Tinangkung Selatan 3.78 9 291 2 460 2.79 0.57 7201042 Sulawesi Tengah Banggai Kepulauan Tinangkung Utara 3.94 9 892 2 510 2.84 0.58 7201050 Sulawesi Tengah Banggai Kepulauan Liang 3.97 11 308 2 848 3.22 0.66 7201051 Sulawesi Tengah Banggai Kepulauan Peling Tengah 4.06 11 922 2 940 3.33 0.68 7201060 Sulawesi Tengah Banggai Kepulauan Bulagi 3.88 12 289 3 169 3.59 0.73 7201061 Sulawesi Tengah Banggai Kepulauan Bulagi Selatan 3.96 12 530 3 165 3.58 0.73 7201062 Sulawesi Tengah Banggai Kepulauan Bulagi Utara 3.91 11 465 2 932 3.32 0.68 7201070 Sulawesi Tengah Banggai Kepulauan Buko 3.70 12 066 3 259 3.69 0.75 7201071 Sulawesi Tengah Banggai Kepulauan Buko Selatan 3.78 10 164 2 691 3.05 0.62 7202010 Sulawesi Tengah Banggai Toili 3.94 39 612 10 045 11.37 2.32 7202011 Sulawesi Tengah Banggai Toili Barat 4.16 26 706 6 423 7.27 1.48 7202012 Sulawesi Tengah Banggai Moilong 4.01 23 338 5 815 6.58 1.34 7202020 Sulawesi Tengah Banggai Batui 4.06 18 990 4 682 5.30 1.08 7202021 Sulawesi Tengah Banggai Batui Selatan 4.05 16 568 4 093 4.63 0.94 7202030 Sulawesi Tengah Banggai Bunta 4.16 23 571 5 671 6.42 1.31 7202031 Sulawesi Tengah Banggai Nuhon 3.97 23 066 5 815 6.58 1.34 7202032 Sulawesi Tengah Banggai Simpang Raya 3.92 17 525 4 472 5.06 1.03 7202040 Sulawesi Tengah Banggai Kintom 4.02 16 795 4 178 4.73 0.96 7202050 Sulawesi Tengah Banggai Luwuk 3.94 95 308 24 193 27.39 5.58 7202051 Sulawesi Tengah Banggai Luwuk Timur 3.80 13 615 3 581 4.05 0.83 7202060 Sulawesi Tengah Banggai Pagimana 4.42 28 659 6 486 7.34 1.50 7202061 Sulawesi Tengah Banggai Bualemo 3.83 21 882 5 717 6.47 1.32 7202062 Sulawesi Tengah Banggai Lobu 4.20 4 286 1 021 1.16 0.24 7202070 Sulawesi Tengah Banggai Lamala 3.87 16 133 4 170 4.72 0.96 7202071 Sulawesi Tengah Banggai Masama 3.75 13 563 3 619 4.10 0.83 7202080 Sulawesi Tengah Banggai Balantak 3.74 11 994 3 211 3.64 0.74 7202081 Sulawesi Tengah Banggai Balantak Selatan 3.67 5 746 1 568 1.78 0.36 7203010 Sulawesi Tengah Morowali Menui Kepulauan 4.08 15 558 3 814 4.32 0.88 7203020 Sulawesi Tengah Morowali Bungku Selatan 4.43 22 276 5 034 5.70 1.16 7203021 Sulawesi Tengah Morowali Bahodopi 4.40 8 504 1 931 2.19 0.45 7203030 Sulawesi Tengah Morowali Bungku Tengah 4.34 35 818 8 246 9.34 1.90 7203040 Sulawesi Tengah Morowali Bungku Barat 4.37 13 016 2 977 3.37 0.69 7203041 Sulawesi Tengah Morowali Bumi Raya 4.14 14 815 3 579 4.05 0.83 7203042 Sulawesi Tengah Morowali Wita Ponda 3.98 21 849 5 490 6.22 1.27 7203050 Sulawesi Tengah Morowali Lembo 3.93 26 179 6 657 7.54 1.53 7203060 Sulawesi Tengah Morowali Mori Atas 3.88 13 436 3 459 3.92 0.80 7203061 Sulawesi Tengah Morowali Mori Utara 3.89 8 794 2 261 2.56 0.52 7203070 Sulawesi Tengah Morowali Petasia 4.26 43 466 10 209 11.56 2.35 7203071 Sulawesi Tengah Morowali Soyo Jaya 3.95 10 168 2 572 2.91 0.59 7203080 Sulawesi Tengah Morowali Bungku Utara 4.43 18 956 4 283 4.85 0.99 7203081 Sulawesi Tengah Morowali Mamosalato 4.62 13 243 2 869 3.25 0.66 7204010 Sulawesi Tengah Poso Pamona Selatan 4.13 23 693 5 734 6.49 1.32 7204011 Sulawesi Tengah Poso Pamona Barat 4.21 12 051 2 860 3.24 0.66 7204012 Sulawesi Tengah Poso Pamona Tenggara 4.16 8 366 2 012 2.28 0.46 7204020 Sulawesi Tengah Poso Lore Selatan 4.17 7 262 1 740 1.97 0.40 7204021 Sulawesi Tengah Poso Lore Barat 4.31 3 638 844 0.96 0.19 7204030 Sulawesi Tengah Poso Pamona Utara 4.24 38 935 9 179 10.39 2.12 7204031 Sulawesi Tengah Poso Pamona Timur 3.96 12 292 3 102 3.51 0.72 7204040 Sulawesi Tengah Poso Lore Utara 4.15 15 349 3 695 4.18 0.85 7204041 Sulawesi Tengah Poso Lore Tengah 4.23 5 201 1 229 1.39 0.28 7204042 Sulawesi Tengah Poso Lore Timur 4.19 6 290 1 502 1.70 0.35 7204043 Sulawesi Tengah Poso Lore Peore 4.15 3 797 915 1.04 0.21 7204050 Sulawesi Tengah Poso Poso Pesisir 4.32 25 919 6 000 6.79 1.38 7204051 Sulawesi Tengah Poso Poso Pesisir Selatan 3.97 11 403 2 871 3.25 0.66 7204052 Sulawesi Tengah Poso Poso Pesisir Utara 4.12 20 223 4 904 5.55 1.13 7204060 Sulawesi Tengah Poso Lage 4.16 23 438 5 636 6.38 1.30 7204070 Sulawesi Tengah Poso Poso Kota 4.35 26 115 5 997 6.79 1.38 7204071 Sulawesi Tengah Poso Poso Kota Utara 4.32 14 261 3 299 3.73 0.76 7204072 Sulawesi Tengah Poso Poso Kota Selatan 4.08 11 597 2 843 3.22 0.66 7205041 Sulawesi Tengah Donggala Rio Pakava 3.93 28 140 7 166 8.11 1.65 7205051 Sulawesi Tengah Donggala Pinembani 4.28 7 656 1 788 2.02 0.41 7205080 Sulawesi Tengah Donggala Banawa 4.94 41 291 8 361 9.47 1.93 7205081 Sulawesi Tengah Donggala Banawa Selatan 4.24 30 534 7 203 8.15 1.66 7205082 Sulawesi Tengah Donggala Banawa Tengah 4.65 12 989 2 791 3.16 0.64 7205090 Sulawesi Tengah Donggala Labuan 4.63 17 177 3 713 4.20 0.86 7205091 Sulawesi Tengah Donggala Tanantovea 4.63 19 579 4 225 4.78 0.97 7205100 Sulawesi Tengah Donggala Sindue 4.90 23 776 4 856 5.50 1.12 7205101 Sulawesi Tengah Donggala Sindue Tombusabora 4.77 14 599 3 062 3.47 0.71 7205102 Sulawesi Tengah Donggala Sindue Tobata 4.64 11 317 2 441 2.76 0.56 7205120 Sulawesi Tengah Donggala Sirenja 4.62 26 058 5 635 6.38 1.30 7205130 Sulawesi Tengah Donggala Balaesang 4.47 29 398 6 575 7.44 1.52 7205131 Sulawesi Tengah Donggala Balaesang Tanjung 4.71 13 348 2 836 3.21 0.65 7205140 Sulawesi Tengah Donggala Damsol 4.18 37 319 8 927 10.11 2.06 7205160 Sulawesi Tengah Donggala Sojol 4.06 32 781 8 072 9.14 1.86 7205161 Sulawesi Tengah Donggala Sojol Utara 4.24 12 066 2 849 3.23 0.66 7206010 Sulawesi Tengah Toli-Toli Dampal Selatan 4.24 27 590 6 501 7.36 1.50 7206020 Sulawesi Tengah Toli-Toli Dampal Utara 4.25 18 558 4 370 4.95 1.01 7206030 Sulawesi Tengah Toli-Toli Dondo 4.48 27 544 6 148 6.96 1.42 7206031 Sulawesi Tengah Toli-Toli Ogodeide 4.17 15 066 3 614 4.09 0.83 7206032 Sulawesi Tengah Toli-Toli Basidondo 3.99 13 487 3 383 3.83 0.78 7206040 Sulawesi Tengah Toli-Toli Baolan 4.31 81 338 18 864 21.36 4.35 7206041 Sulawesi Tengah Toli-Toli Lampasio 3.98 15 314 3 844 4.35 0.89 7206050 Sulawesi Tengah Toli-Toli Galang 4.39 40 882 9 302 10.53 2.14 Annex II – Demand forecast results Page 3 of 12 District ID Province Regency District habitants/household Population # Households Energy demand (GWh) Peak demand (MW) 7206060 Sulawesi Tengah Toli-Toli Tolitoli Utara 4.09 21 846 5 336 6.04 1.23 7206061 Sulawesi Tengah Toli-Toli Dako Pamean 4.18 10 867 2 601 2.94 0.60 7207010 Sulawesi Tengah Buol Lakea 5.07 12 510 2 469 2.80 0.57 7207011 Sulawesi Tengah Buol Biau 4.40 35 551 8 084 9.15 1.86 7207012 Sulawesi Tengah Buol Karamat 4.99 10 699 2 145 2.43 0.49 7207020 Sulawesi Tengah Buol Momunu 4.82 17 886 3 713 4.20 0.86 7207021 Sulawesi Tengah Buol Tiloan 3.95 12 838 3 254 3.68 0.75 7207030 Sulawesi Tengah Buol Bokat 4.46 16 261 3 648 4.13 0.84 7207031 Sulawesi Tengah Buol Bukal 4.22 17 391 4 125 4.67 0.95 7207040 Sulawesi Tengah Buol Bunobogu 4.47 11 367 2 542 2.88 0.59 7207041 Sulawesi Tengah Buol Gadung 4.54 14 621 3 218 3.64 0.74 7207050 Sulawesi Tengah Buol Paleleh 4.24 14 603 3 447 3.90 0.79 7207051 Sulawesi Tengah Buol Paleleh Barat 4.35 6 932 1 593 1.80 0.37 7208010 Sulawesi Tengah Parigi Moutong Sausu 4.09 27 706 6 779 7.67 1.56 7208011 Sulawesi Tengah Parigi Moutong Torue 4.13 24 190 5 858 6.63 1.35 7208012 Sulawesi Tengah Parigi Moutong Balinggi 4.31 21 216 4 922 5.57 1.13 7208020 Sulawesi Tengah Parigi Moutong Parigi 4.44 36 491 8 211 9.30 1.89 7208021 Sulawesi Tengah Parigi Moutong Parigi Selatan 4.30 27 985 6 507 7.37 1.50 7208022 Sulawesi Tengah Parigi Moutong Parigi Barat 4.36 9 191 2 106 2.38 0.49 7208023 Sulawesi Tengah Parigi Moutong Parigi Utara 4.49 7 240 1 611 1.82 0.37 7208024 Sulawesi Tengah Parigi Moutong Parigi Tengah 4.71 10 571 2 247 2.54 0.52 7208030 Sulawesi Tengah Parigi Moutong Ampibabo 4.55 26 539 5 830 6.60 1.34 7208031 Sulawesi Tengah Parigi Moutong Kasimbar 4.42 26 886 6 085 6.89 1.40 7208032 Sulawesi Tengah Parigi Moutong Toribulu 4.51 21 124 4 682 5.30 1.08 7208033 Sulawesi Tengah Parigi Moutong Siniu 4.43 11 197 2 531 2.87 0.58 7208040 Sulawesi Tengah Parigi Moutong Tinombo 4.53 44 172 9 753 11.04 2.25 7208041 Sulawesi Tengah Parigi Moutong Tinombo Selatan 4.62 32 950 7 140 8.08 1.65 7208050 Sulawesi Tengah Parigi Moutong Tomini 4.66 23 048 4 946 5.60 1.14 7208051 Sulawesi Tengah Parigi Moutong Mepanga 4.14 35 399 8 544 9.67 1.97 7208052 Sulawesi Tengah Parigi Moutong Palasa 4.74 33 907 7 161 8.11 1.65 7208060 Sulawesi Tengah Parigi Moutong Moutong 4.49 26 172 5 832 6.60 1.34 7208061 Sulawesi Tengah Parigi Moutong Bolano Lambunu 4.11 70 953 17 249 19.53 3.98 7208062 Sulawesi Tengah Parigi Moutong Taopa 4.28 16 436 3 845 4.35 0.89 7209010 Sulawesi Tengah Tojo Una-Una Tojo Barat 4.32 14 643 3 387 3.83 0.78 7209020 Sulawesi Tengah Tojo Una-Una Tojo 4.24 16 069 3 789 4.29 0.87 7209030 Sulawesi Tengah Tojo Una-Una Ulubongka 4.72 20 188 4 276 4.84 0.99 7209040 Sulawesi Tengah Tojo Una-Una Ampana Tete 4.48 28 845 6 434 7.28 1.48 7209050 Sulawesi Tengah Tojo Una-Una Ampana Kota 4.41 51 970 11 794 13.35 2.72 7209060 Sulawesi Tengah Tojo Una-Una Una-Una 4.38 16 039 3 662 4.15 0.84 7209070 Sulawesi Tengah Tojo Una-Una Togean 4.61 11 735 2 544 2.88 0.59 7209080 Sulawesi Tengah Tojo Una-Una Walea Kepulauan 4.72 13 274 2 814 3.19 0.65 7209081 Sulawesi Tengah Tojo Una-Una Walea Besar 4.38 4 962 1 133 1.28 0.26 7210010 Sulawesi Tengah Sigi Pipikoro 4.13 10 081 2 439 2.76 0.56 7210020 Sulawesi Tengah Sigi Kulawi Selatan 4.55 10 927 2 400 2.72 0.55 7210030 Sulawesi Tengah Sigi Kulawi 4.23 18 277 4 318 4.89 1.00 7210040 Sulawesi Tengah Sigi Lindu 4.56 6 049 1 328 1.50 0.31 7210050 Sulawesi Tengah Sigi Nokilalaki 4.13 7 256 1 756 1.99 0.40 7210060 Sulawesi Tengah Sigi Palolo 4.08 35 316 8 646 9.79 1.99 7210070 Sulawesi Tengah Sigi Gumbasa 4.37 15 066 3 452 3.91 0.80 7210080 Sulawesi Tengah Sigi Dolo Selatan 4.38 18 633 4 256 4.82 0.98 7210090 Sulawesi Tengah Sigi Dolo Barat 4.31 16 219 3 768 4.27 0.87 7210100 Sulawesi Tengah Sigi Tanambulava 4.08 10 144 2 487 2.82 0.57 7210110 Sulawesi Tengah Sigi Dolo 4.52 26 555 5 879 6.66 1.36 7210120 Sulawesi Tengah Sigi Sigi Biromaru 4.28 55 269 12 899 14.60 2.97 7210130 Sulawesi Tengah Sigi Marawola 4.35 27 070 6 223 7.05 1.43 7210140 Sulawesi Tengah Sigi Marawola Barat 3.47 8 231 2 372 2.69 0.55 7210150 Sulawesi Tengah Sigi Kinovaro 4.03 12 218 3 030 3.43 0.70 7271010 Sulawesi Tengah Palu Palu Barat 4.47 127 334 28 475 32.24 6.56 7271020 Sulawesi Tengah Palu Palu Selatan 4.21 158 301 37 610 42.58 8.67 7271030 Sulawesi Tengah Palu Palu Timur 3.85 97 967 25 420 28.78 5.86 7271040 Sulawesi Tengah Palu Palu Utara 4.72 50 390 10 686 12.10 2.46 7301010 Sulawesi Selatan Kepulauan Selayar Pasimarannu 3.72 10 604 2 854 3.97 0.76 7301011 Sulawesi Selatan Kepulauan Selayar Pasilambena 4.03 8 032 1 995 2.78 0.53 7301020 Sulawesi Selatan Kepulauan Selayar Pasimassunggu 3.86 9 025 2 338 3.25 0.62 7301021 Sulawesi Selatan Kepulauan Selayar Takabonerate 4.25 14 554 3 426 4.77 0.91 7301022 Sulawesi Selatan Kepulauan Selayar Pasimassunggu Timur 3.93 8 649 2 199 3.06 0.59 7301030 Sulawesi Selatan Kepulauan Selayar Bontosikuyu 3.85 16 964 4 404 6.13 1.17 7301040 Sulawesi Selatan Kepulauan Selayar Bontoharu 4.10 14 776 3 607 5.02 0.96 7301041 Sulawesi Selatan Kepulauan Selayar Benteng 4.26 25 263 5 928 8.25 1.58 7301042 Sulawesi Selatan Kepulauan Selayar Bontomanai 3.91 14 471 3 705 5.15 0.99 7301050 Sulawesi Selatan Kepulauan Selayar Bontomatene 3.70 14 879 4 024 5.60 1.07 7301051 Sulawesi Selatan Kepulauan Selayar Buki 3.80 7 250 1 909 2.66 0.51 7302010 Sulawesi Selatan Bulukumba Gantarang 4.12 84 399 20 463 28.47 5.45 7302020 Sulawesi Selatan Bulukumba Ujung Bulu 4.45 56 678 12 727 17.71 3.39 7302021 Sulawesi Selatan Bulukumba Ujung Loe 4.05 46 436 11 475 15.97 3.05 7302030 Sulawesi Selatan Bulukumba Bonto Bahari 4.01 28 544 7 115 9.90 1.89 7302040 Sulawesi Selatan Bulukumba Bontotiro 3.70 26 948 7 283 10.13 1.94 7302050 Sulawesi Selatan Bulukumba Hero Lange-Lange 3.89 28 455 7 312 10.17 1.95 7302060 Sulawesi Selatan Bulukumba Kajang 4.42 55 609 12 589 17.52 3.35 7302070 Sulawesi Selatan Bulukumba Bulukumpa 4.06 59 898 14 769 20.55 3.93 7302080 Sulawesi Selatan Bulukumba Rilau Ale 4.08 44 824 10 996 15.30 2.93 7302090 Sulawesi Selatan Bulukumba Kindang 4.15 35 210 8 475 11.79 2.26 7303010 Sulawesi Selatan Bantaeng Bissappu 3.96 36 610 9 240 12.86 2.46 Annex II – Demand forecast results Page 4 of 12 District ID Province Regency District habitants/household Population # Households Energy demand (GWh) Peak demand (MW) 7303011 Sulawesi Selatan Bantaeng Uluere 4.39 12 800 2 918 4.06 0.78 7303012 Sulawesi Selatan Bantaeng Sinoa 3.81 13 999 3 678 5.12 0.98 7303020 Sulawesi Selatan Bantaeng Bantaeng 4.24 43 459 10 246 14.26 2.73 7303021 Sulawesi Selatan Bantaeng Eremerasa 4.20 22 032 5 250 7.30 1.40 7303030 Sulawesi Selatan Bantaeng Tompobulu 4.00 27 120 6 783 9.44 1.81 7303031 Sulawesi Selatan Bantaeng Pa'jukukang 4.10 34 345 8 373 11.65 2.23 7303032 Sulawesi Selatan Bantaeng Gantarangkeke 3.82 18 778 4 921 6.85 1.31 7304010 Sulawesi Selatan Jeneponto Bangkala 4.30 59 013 13 731 19.10 3.65 7304011 Sulawesi Selatan Jeneponto Bangkala Barat 4.01 31 176 7 776 10.82 2.07 7304020 Sulawesi Selatan Jeneponto Tamalatea 4.49 47 759 10 642 14.81 2.83 7304021 Sulawesi Selatan Jeneponto Bontoramba 4.49 41 396 9 225 12.83 2.46 7304030 Sulawesi Selatan Jeneponto Binamu 4.68 62 044 13 248 18.43 3.53 7304031 Sulawesi Selatan Jeneponto Turatea 4.50 35 412 7 862 10.94 2.09 7304040 Sulawesi Selatan Jeneponto Batang 4.50 22 716 5 051 7.03 1.34 7304041 Sulawesi Selatan Jeneponto Arungkeke 4.40 21 581 4 905 6.82 1.31 7304042 Sulawesi Selatan Jeneponto Tarowang 4.51 26 438 5 868 8.16 1.56 7304050 Sulawesi Selatan Jeneponto Kelara 4.21 31 295 7 431 10.34 1.98 7304051 Sulawesi Selatan Jeneponto Rumbia 4.33 26 790 6 191 8.61 1.65 7305010 Sulawesi Selatan Takalar Mangara Bombang 4.37 43 425 9 938 13.83 2.65 7305020 Sulawesi Selatan Takalar Mappakasunggu 4.46 17 919 4 017 5.59 1.07 7305021 Sulawesi Selatan Takalar Sanrobone 4.56 15 714 3 444 4.79 0.92 7305030 Sulawesi Selatan Takalar Polombangkeng Selatan 4.00 31 666 7 921 11.02 2.11 7305031 Sulawesi Selatan Takalar Pattallassang 4.35 41 105 9 455 13.15 2.52 7305040 Sulawesi Selatan Takalar Polombangkeng Utara 4.07 54 238 13 331 18.55 3.55 7305050 Sulawesi Selatan Takalar Galesong Selatan 4.51 28 234 6 262 8.71 1.67 7305051 Sulawesi Selatan Takalar Galesong 4.40 44 232 10 063 14.00 2.68 7305060 Sulawesi Selatan Takalar Galesong Utara 4.53 42 569 9 404 13.08 2.50 7306010 Sulawesi Selatan Gowa Bontonompo 4.04 46 510 11 510 16.01 3.06 7306011 Sulawesi Selatan Gowa Bontonompo Selatan 4.56 33 698 7 386 10.28 1.97 7306020 Sulawesi Selatan Gowa Bajeng 4.38 73 778 16 856 23.45 4.49 7306021 Sulawesi Selatan Gowa Bajeng Barat 4.17 27 126 6 507 9.05 1.73 7306030 Sulawesi Selatan Gowa Pallangga 4.50 116 845 25 963 36.12 6.91 7306031 Sulawesi Selatan Gowa Barombong 4.54 40 866 9 003 12.53 2.40 7306040 Sulawesi Selatan Gowa Somba Opu 4.60 154 206 33 523 46.64 8.92 7306050 Sulawesi Selatan Gowa Bontomarannu 4.33 36 988 8 550 11.90 2.28 7306051 Sulawesi Selatan Gowa Pattallassang 4.47 25 899 5 800 8.07 1.54 7306060 Sulawesi Selatan Gowa Parangloe 4.24 19 605 4 622 6.43 1.23 7306061 Sulawesi Selatan Gowa Manuju 4.02 16 681 4 152 5.78 1.11 7306070 Sulawesi Selatan Gowa Tinggimoncong 4.28 26 203 6 119 8.51 1.63 7306071 Sulawesi Selatan Gowa Tombolo Pao 4.50 31 811 7 064 9.83 1.88 7306072 Sulawesi Selatan Gowa Parigi 3.98 15 492 3 891 5.41 1.04 7306080 Sulawesi Selatan Gowa Bungaya 4.24 18 757 4 427 6.16 1.18 7306081 Sulawesi Selatan Gowa Bontolempangan 4.00 15 780 3 941 5.48 1.05 7306090 Sulawesi Selatan Gowa Tompobulu 4.03 34 290 8 513 11.84 2.27 7306091 Sulawesi Selatan Gowa Biringbulu 3.75 38 286 10 222 14.22 2.72 7307010 Sulawesi Selatan Sinjai Sinjai Barat 4.20 27 205 6 481 9.02 1.72 7307020 Sulawesi Selatan Sinjai Sinjai Borong 4.26 18 821 4 418 6.15 1.18 7307030 Sulawesi Selatan Sinjai Sinjai Selatan 4.48 43 858 9 785 13.61 2.60 7307040 Sulawesi Selatan Sinjai Tellu Limpoe 4.24 37 222 8 786 12.22 2.34 7307050 Sulawesi Selatan Sinjai Sinjai Timur 4.62 34 290 7 416 10.32 1.97 7307060 Sulawesi Selatan Sinjai Sinjai Tengah 4.37 30 734 7 036 9.79 1.87 7307070 Sulawesi Selatan Sinjai Sinjai Utara 4.90 51 447 10 497 14.60 2.79 7307080 Sulawesi Selatan Sinjai Bulupoddo 4.22 18 560 4 395 6.11 1.17 7307090 Sulawesi Selatan Sinjai Pulau Sembilan 4.82 8 765 1 819 2.53 0.48 7308010 Sulawesi Selatan Maros Mandai 4.46 41 478 9 311 12.95 2.48 7308011 Sulawesi Selatan Maros Moncongloe 4.36 20 049 4 600 6.40 1.22 7308020 Sulawesi Selatan Maros Maros Baru 4.93 28 391 5 763 8.02 1.53 7308021 Sulawesi Selatan Maros Marusu 4.54 29 858 6 584 9.16 1.75 7308022 Sulawesi Selatan Maros Turikale 4.78 48 905 10 239 14.25 2.73 7308023 Sulawesi Selatan Maros Lau 4.82 28 644 5 941 8.27 1.58 7308030 Sulawesi Selatan Maros Bontoa 4.92 31 452 6 399 8.90 1.70 7308040 Sulawesi Selatan Maros Bantimurung 4.33 33 233 7 668 10.67 2.04 7308041 Sulawesi Selatan Maros Simbang 4.37 26 287 6 017 8.37 1.60 7308050 Sulawesi Selatan Maros Tanralili 4.32 28 946 6 706 9.33 1.78 7308051 Sulawesi Selatan Maros Tompu Bulu 4.48 16 694 3 727 5.19 0.99 7308060 Sulawesi Selatan Maros Camba 3.76 14 859 3 949 5.49 1.05 7308061 Sulawesi Selatan Maros Cenrana 4.16 16 089 3 869 5.38 1.03 7308070 Sulawesi Selatan Maros Mallawa 3.75 12 687 3 383 4.71 0.90 7309010 Sulawesi Selatan Pangkajene Dan Kepulauan Liukang Tangaya 3.96 21 681 5 472 7.61 1.46 7309020 Sulawesi Selatan Pangkajene Dan Kepulauan Liukang Kalmas 4.13 15 292 3 706 5.16 0.99 7309030 Sulawesi Selatan Pangkajene Dan Kepulauan Liukang Tupabbiring 5.03 19 997 3 979 5.54 1.06 7309031 Sulawesi Selatan Pangkajene Dan Kepulauan Liukang Tupabbiring Utara 4.54 14 610 3 221 4.48 0.86 7309040 Sulawesi Selatan Pangkajene Dan Kepulauan Pangkajene 4.75 49 357 10 384 14.45 2.76 7309041 Sulawesi Selatan Pangkajene Dan Kepulauan Minasatene 4.56 39 023 8 557 11.91 2.28 7309050 Sulawesi Selatan Pangkajene Dan Kepulauan Balocci 4.25 18 287 4 303 5.99 1.15 7309051 Sulawesi Selatan Pangkajene Dan Kepulauan Tondong Tallasa 3.99 10 341 2 589 3.60 0.69 7309060 Sulawesi Selatan Pangkajene Dan Kepulauan Bungoro 4.39 45 984 10 469 14.57 2.79 7309070 Sulawesi Selatan Pangkajene Dan Kepulauan Labakkang 4.58 51 759 11 313 15.74 3.01 7309080 Sulawesi Selatan Pangkajene Dan Kepulauan Ma'rang 4.38 35 407 8 086 11.25 2.15 7309091 Sulawesi Selatan Pangkajene Dan Kepulauan Segeri 4.54 23 716 5 229 7.28 1.39 7309092 Sulawesi Selatan Pangkajene Dan Kepulauan Mandalle 4.37 16 417 3 756 5.23 1.00 7310010 Sulawesi Selatan Barru Tanete Riaja 4.18 25 920 6 204 8.63 1.65 7310011 Sulawesi Selatan Barru Pujananting 4.59 15 133 3 297 4.59 0.88 Annex II – Demand forecast results Page 5 of 12 District ID Province Regency District habitants/household Population # Households Energy demand (GWh) Peak demand (MW) 7310020 Sulawesi Selatan Barru Tanete Rilau 4.28 38 778 9 055 12.60 2.41 7310030 Sulawesi Selatan Barru Barru 4.16 45 371 10 901 15.17 2.90 7310040 Sulawesi Selatan Barru Soppeng Riaja 4.14 20 829 5 031 7.00 1.34 7310041 Sulawesi Selatan Barru Balusu 4.06 20 802 5 118 7.12 1.36 7310050 Sulawesi Selatan Barru Mallusetasi 4.15 29 626 7 133 9.92 1.90 7311010 Sulawesi Selatan Bone Bontocani 4.22 18 170 4 305 5.99 1.15 7311020 Sulawesi Selatan Bone Kahu 4.17 44 265 10 607 14.76 2.82 7311030 Sulawesi Selatan Bone Kajuara 4.68 40 951 8 742 12.16 2.33 7311040 Sulawesi Selatan Bone Salomekko 4.48 17 719 3 955 5.50 1.05 7311050 Sulawesi Selatan Bone Tonra 4.55 15 186 3 335 4.64 0.89 7311060 Sulawesi Selatan Bone Patimpeng 4.25 18 547 4 360 6.07 1.16 7311070 Sulawesi Selatan Bone Libureng 4.02 34 520 8 590 11.95 2.29 7311080 Sulawesi Selatan Bone Mare 4.55 29 743 6 544 9.10 1.74 7311090 Sulawesi Selatan Bone Sibulue 4.59 38 661 8 428 11.73 2.24 7311100 Sulawesi Selatan Bone Cina 4.28 30 107 7 033 9.79 1.87 7311110 Sulawesi Selatan Bone Barebbo 4.52 31 227 6 903 9.60 1.84 7311120 Sulawesi Selatan Bone Ponre 4.32 15 621 3 614 5.03 0.96 7311130 Sulawesi Selatan Bone Lappariaja 4.25 27 440 6 455 8.98 1.72 7311140 Sulawesi Selatan Bone Lamuru 4.08 28 753 7 046 9.80 1.88 7311141 Sulawesi Selatan Bone Tellu Limpoe 4.42 16 300 3 688 5.13 0.98 7311150 Sulawesi Selatan Bone Bengo 4.24 29 883 7 045 9.80 1.88 7311160 Sulawesi Selatan Bone Ulaweng 4.28 29 003 6 777 9.43 1.80 7311170 Sulawesi Selatan Bone Palakka 4.30 26 139 6 074 8.45 1.62 7311180 Sulawesi Selatan Bone Awangpone 4.51 33 831 7 500 10.43 2.00 7311190 Sulawesi Selatan Bone Tellu Siattinge 4.46 47 028 10 533 14.65 2.80 7311200 Sulawesi Selatan Bone Amali 4.18 24 318 5 817 8.09 1.55 7311210 Sulawesi Selatan Bone Ajangale 4.29 32 198 7 505 10.44 2.00 7311220 Sulawesi Selatan Bone Dua Boccoe 4.38 35 438 8 097 11.27 2.16 7311230 Sulawesi Selatan Bone Cenrana 4.58 27 651 6 036 8.40 1.61 7311710 Sulawesi Selatan Bone Tanete Riattang Barat 4.54 51 501 11 349 15.79 3.02 7311720 Sulawesi Selatan Bone Tanete Riattang 4.60 57 442 12 485 17.37 3.32 7311730 Sulawesi Selatan Bone Tanete Riattang Timur 5.08 47 809 9 408 13.09 2.50 7312010 Sulawesi Selatan Soppeng Mario Riwawo 4.10 52 445 12 787 17.79 3.40 7312020 Sulawesi Selatan Soppeng Lalabata 4.15 52 397 12 626 17.57 3.36 7312030 Sulawesi Selatan Soppeng Lili Riaja 4.00 31 915 7 980 11.10 2.12 7312031 Sulawesi Selatan Soppeng Ganra 3.89 13 376 3 438 4.78 0.92 7312032 Sulawesi Selatan Soppeng Citta 4.10 9 468 2 309 3.21 0.61 7312040 Sulawesi Selatan Soppeng Lili Rilau 3.86 45 216 11 706 16.29 3.12 7312050 Sulawesi Selatan Soppeng Donri Donri 3.77 27 128 7 187 10.00 1.91 7312060 Sulawesi Selatan Soppeng Mario Riawa 3.83 32 976 8 604 11.97 2.29 7313010 Sulawesi Selatan Wajo Sabbang Paru 3.94 30 519 7 744 10.77 2.06 7313020 Sulawesi Selatan Wajo Tempe 4.46 72 262 16 211 22.55 4.31 7313030 Sulawesi Selatan Wajo Pammana 4.01 36 934 9 218 12.83 2.45 7313040 Sulawesi Selatan Wajo Bola 4.21 22 944 5 455 7.59 1.45 7313050 Sulawesi Selatan Wajo Takkalalla 4.18 24 397 5 842 8.13 1.55 7313060 Sulawesi Selatan Wajo Sajoanging 3.99 22 108 5 536 7.70 1.47 7313061 Sulawesi Selatan Wajo Penrang 3.98 18 382 4 619 6.43 1.23 7313070 Sulawesi Selatan Wajo Majauleng 3.99 36 937 9 249 12.87 2.46 7313080 Sulawesi Selatan Wajo Tana Sitolo 4.23 46 492 10 990 15.29 2.93 7313090 Sulawesi Selatan Wajo Belawa 4.32 37 785 8 751 12.18 2.33 7313100 Sulawesi Selatan Wajo Maniang Pajo 4.20 18 952 4 508 6.27 1.20 7313101 Sulawesi Selatan Wajo Gilireng 3.81 13 057 3 426 4.77 0.91 7313110 Sulawesi Selatan Wajo Keera 3.92 25 725 6 571 9.14 1.75 7313120 Sulawesi Selatan Wajo Pitumpanua 4.26 49 324 11 569 16.10 3.08 7314010 Sulawesi Selatan Sidenreng Rappang Panca Lautang 4.01 20 407 5 085 7.07 1.35 7314020 Sulawesi Selatan Sidenreng Rappang Tellulimpo E 4.39 26 901 6 126 8.52 1.63 7314030 Sulawesi Selatan Sidenreng Rappang Watang Pulu 4.21 35 660 8 462 11.77 2.25 7314040 Sulawesi Selatan Sidenreng Rappang Baranti 3.99 33 221 8 327 11.59 2.22 7314050 Sulawesi Selatan Sidenreng Rappang Panca Rijang 4.22 32 059 7 605 10.58 2.02 7314051 Sulawesi Selatan Sidenreng Rappang Kulo 4.11 13 428 3 270 4.55 0.87 7314060 Sulawesi Selatan Sidenreng Rappang Maritengngae 4.36 54 610 12 525 17.43 3.33 7314061 Sulawesi Selatan Sidenreng Rappang Watang Sidenreng 4.19 20 182 4 821 6.71 1.28 7314070 Sulawesi Selatan Sidenreng Rappang Pitu Riawa 4.34 29 566 6 814 9.48 1.81 7314080 Sulawesi Selatan Sidenreng Rappang Duapitue 4.36 32 279 7 397 10.29 1.97 7314081 Sulawesi Selatan Sidenreng Rappang Pitu Riase 4.20 23 522 5 598 7.79 1.49 7315010 Sulawesi Selatan Pinrang Suppa 4.29 36 105 8 423 11.72 2.24 7315020 Sulawesi Selatan Pinrang Mattirosompe 4.09 32 479 7 940 11.05 2.11 7315021 Sulawesi Selatan Pinrang Lanrisang 4.07 20 277 4 980 6.93 1.33 7315030 Sulawesi Selatan Pinrang Mattiro Bulu 4.04 31 776 7 861 10.94 2.09 7315040 Sulawesi Selatan Pinrang Watang Sawitto 4.47 60 473 13 540 18.84 3.60 7315041 Sulawesi Selatan Pinrang Paleteang 4.46 43 437 9 743 13.56 2.59 7315042 Sulawesi Selatan Pinrang Tiroang 4.30 24 685 5 746 7.99 1.53 7315050 Sulawesi Selatan Pinrang Patampanua 4.28 37 323 8 712 12.12 2.32 7315060 Sulawesi Selatan Pinrang Cempa 4.16 20 378 4 896 6.81 1.30 7315070 Sulawesi Selatan Pinrang Duampanua 4.29 51 933 12 116 16.86 3.22 7315071 Sulawesi Selatan Pinrang Batulappa 4.57 11 424 2 498 3.48 0.66 7315080 Sulawesi Selatan Pinrang Lembang 4.31 45 294 10 505 14.62 2.80 7316010 Sulawesi Selatan Enrekang Maiwa 4.54 27 364 6 032 8.39 1.61 7316011 Sulawesi Selatan Enrekang Bungin 4.36 5 143 1 179 1.64 0.31 7316020 Sulawesi Selatan Enrekang Enrekang 4.62 36 180 7 838 10.91 2.09 7316021 Sulawesi Selatan Enrekang Cendana 4.38 10 292 2 351 3.27 0.63 7316030 Sulawesi Selatan Enrekang Baraka 4.44 25 094 5 651 7.86 1.50 7316031 Sulawesi Selatan Enrekang Buntu Batu 4.29 15 126 3 528 4.91 0.94 Annex II – Demand forecast results Page 6 of 12 District ID Province Regency District habitants/household Population # Households Energy demand (GWh) Peak demand (MW) 7316040 Sulawesi Selatan Enrekang Anggeraja 4.49 28 199 6 287 8.75 1.67 7316041 Sulawesi Selatan Enrekang Malua 4.22 9 044 2 142 2.98 0.57 7316050 Sulawesi Selatan Enrekang Alla 4.57 24 450 5 354 7.45 1.42 7316051 Sulawesi Selatan Enrekang Curio 4.44 17 566 3 956 5.50 1.05 7316052 Sulawesi Selatan Enrekang Masalle 4.39 14 556 3 313 4.61 0.88 7316053 Sulawesi Selatan Enrekang Baroko 4.39 12 167 2 774 3.86 0.74 7317010 Sulawesi Selatan Luwu Larompong 4.32 22 292 5 162 7.18 1.37 7317011 Sulawesi Selatan Luwu Larompong Selatan 4.41 18 701 4 244 5.90 1.13 7317020 Sulawesi Selatan Luwu Suli 4.87 21 872 4 496 6.26 1.20 7317021 Sulawesi Selatan Luwu Suli Barat 4.37 10 050 2 299 3.20 0.61 7317030 Sulawesi Selatan Luwu Belopa 4.80 17 532 3 651 5.08 0.97 7317031 Sulawesi Selatan Luwu Kamanre 4.54 13 302 2 928 4.07 0.78 7317032 Sulawesi Selatan Luwu Belopa Utara 4.59 17 216 3 755 5.22 1.00 7317040 Sulawesi Selatan Luwu Bajo 4.92 16 852 3 422 4.76 0.91 7317041 Sulawesi Selatan Luwu Bajo Barat 4.71 11 036 2 342 3.26 0.62 7317050 Sulawesi Selatan Luwu Bassesangtempe 4.07 16 707 4 103 5.71 1.09 7317051 Sulawesi Selatan Luwu Latimojong 3.69 6 459 1 752 2.44 0.47 7317060 Sulawesi Selatan Luwu Bupon 4.45 17 105 3 844 5.35 1.02 7317061 Sulawesi Selatan Luwu Ponrang 4.77 30 909 6 477 9.01 1.72 7317062 Sulawesi Selatan Luwu Ponrang Selatan 4.91 28 104 5 723 7.96 1.52 7317070 Sulawesi Selatan Luwu Bua 4.58 36 638 7 996 11.12 2.13 7317080 Sulawesi Selatan Luwu Walenrang 4.87 20 634 4 239 5.90 1.13 7317081 Sulawesi Selatan Luwu Walenrang Timur 4.76 18 087 3 796 5.28 1.01 7317090 Sulawesi Selatan Luwu Lamasi 4.28 24 103 5 631 7.83 1.50 7317091 Sulawesi Selatan Luwu Walenrang Utara 4.53 21 002 4 636 6.45 1.23 7317092 Sulawesi Selatan Luwu Walenrang Barat 5.21 10 531 2 022 2.81 0.54 7317093 Sulawesi Selatan Luwu Lamasi Timur 4.70 14 400 3 067 4.27 0.82 7318010 Sulawesi Selatan Tana Toraja Bonggakaradeng 4.92 7 893 1 606 2.23 0.43 7318011 Sulawesi Selatan Tana Toraja Simbuang 4.51 7 298 1 617 2.25 0.43 7318012 Sulawesi Selatan Tana Toraja Rano 4.74 7 152 1 509 2.10 0.40 7318013 Sulawesi Selatan Tana Toraja Mappak 4.47 6 521 1 459 2.03 0.39 7318020 Sulawesi Selatan Tana Toraja Mengkendek 4.35 32 362 7 448 10.36 1.98 7318021 Sulawesi Selatan Tana Toraja Gandang Batu Silanan 4.06 22 770 5 608 7.80 1.49 7318030 Sulawesi Selatan Tana Toraja Sangalla 4.45 7 819 1 757 2.44 0.47 7318031 Sulawesi Selatan Tana Toraja Sangala Selatan 4.32 8 713 2 015 2.80 0.54 7318032 Sulawesi Selatan Tana Toraja Sangalla Utara 4.15 8 673 2 091 2.91 0.56 7318040 Sulawesi Selatan Tana Toraja Makale 4.25 39 806 9 363 13.03 2.49 7318041 Sulawesi Selatan Tana Toraja Makale Selatan 4.48 14 695 3 283 4.57 0.87 7318042 Sulawesi Selatan Tana Toraja Makale Utara 4.39 13 966 3 181 4.43 0.85 7318050 Sulawesi Selatan Tana Toraja Saluputti 4.52 8 787 1 943 2.70 0.52 7318051 Sulawesi Selatan Tana Toraja Bittuang 4.58 16 863 3 685 5.13 0.98 7318052 Sulawesi Selatan Tana Toraja Rembon 4.55 21 564 4 740 6.59 1.26 7318053 Sulawesi Selatan Tana Toraja Masanda 4.44 7 431 1 675 2.33 0.45 7318054 Sulawesi Selatan Tana Toraja Malimbong Balepe 4.31 10 562 2 448 3.41 0.65 7318061 Sulawesi Selatan Tana Toraja Rantetayo 4.41 12 709 2 884 4.01 0.77 7318067 Sulawesi Selatan Tana Toraja Kurra 4.71 6 095 1 294 1.80 0.34 7322010 Sulawesi Selatan Luwu Utara Sabbang 4.31 41 235 9 567 13.31 2.55 7322020 Sulawesi Selatan Luwu Utara Baebunta 4.32 50 975 11 795 16.41 3.14 7322030 Sulawesi Selatan Luwu Utara Malangke 4.32 31 963 7 403 10.30 1.97 7322031 Sulawesi Selatan Luwu Utara Malangke Barat 4.47 27 829 6 224 8.66 1.66 7322040 Sulawesi Selatan Luwu Utara Sukamaju 4.02 48 267 12 014 16.72 3.20 7322050 Sulawesi Selatan Luwu Utara Bone-Bone 4.34 54 282 12 522 17.42 3.33 7322120 Sulawesi Selatan Luwu Utara Masamba 4.21 36 972 8 786 12.22 2.34 7322121 Sulawesi Selatan Luwu Utara Mappedeceng 4.04 25 951 6 430 8.95 1.71 7322122 Sulawesi Selatan Luwu Utara Rampi 4.90 3 386 692 0.96 0.18 7322130 Sulawesi Selatan Luwu Utara Limbong 4.87 4 527 930 1.29 0.25 7322131 Sulawesi Selatan Luwu Utara Seko 4.48 14 866 3 318 4.62 0.88 7325010 Sulawesi Selatan Luwu Timur Burau 4.50 36 544 8 122 11.30 2.16 7325020 Sulawesi Selatan Luwu Timur Wotu 4.45 33 259 7 474 10.40 1.99 7325030 Sulawesi Selatan Luwu Timur Tomoni 4.13 26 434 6 394 8.90 1.70 7325031 Sulawesi Selatan Luwu Timur Tomoni Timur 4.11 13 893 3 380 4.70 0.90 7325040 Sulawesi Selatan Luwu Timur Angkona 4.20 25 662 6 107 8.50 1.63 7325050 Sulawesi Selatan Luwu Timur Malili 4.54 38 703 8 531 11.87 2.27 7325060 Sulawesi Selatan Luwu Timur Towuti 4.70 32 194 6 856 9.54 1.82 7325070 Sulawesi Selatan Luwu Timur Nuha 3.90 23 775 6 090 8.47 1.62 7325071 Sulawesi Selatan Luwu Timur Wasuponda 4.53 21 268 4 698 6.54 1.25 7325080 Sulawesi Selatan Luwu Timur Mangkutana 4.09 23 482 5 743 7.99 1.53 7325081 Sulawesi Selatan Luwu Timur Kalaena 4.03 12 485 3 102 4.32 0.83 7326010 Sulawesi Selatan Toraja Utara Sopai 4.60 15 437 3 356 4.67 0.89 7326020 Sulawesi Selatan Toraja Utara Kesu 4.58 18 351 4 009 5.58 1.07 7326030 Sulawesi Selatan Toraja Utara Sanggalangi 4.40 13 173 2 994 4.17 0.80 7326040 Sulawesi Selatan Toraja Utara Buntao 4.06 10 547 2 600 3.62 0.69 7326050 Sulawesi Selatan Toraja Utara Rantebua 4.46 8 990 2 015 2.80 0.54 7326060 Sulawesi Selatan Toraja Utara Nanggala 3.95 10 880 2 758 3.84 0.73 7326070 Sulawesi Selatan Toraja Utara Tondon 4.95 11 203 2 266 3.15 0.60 7326080 Sulawesi Selatan Toraja Utara Tallunglipu 4.93 21 386 4 341 6.04 1.16 7326090 Sulawesi Selatan Toraja Utara Rantepao 4.51 30 283 6 708 9.33 1.79 7326100 Sulawesi Selatan Toraja Utara Tikala 4.72 12 162 2 575 3.58 0.69 7326110 Sulawesi Selatan Toraja Utara Sesean 4.35 12 893 2 963 4.12 0.79 7326120 Sulawesi Selatan Toraja Utara Balusu 3.97 8 002 2 018 2.81 0.54 7326130 Sulawesi Selatan Toraja Utara Sa'dan 4.98 17 663 3 544 4.93 0.94 7326140 Sulawesi Selatan Toraja Utara Bengkelekila 4.82 6 070 1 261 1.75 0.34 7326150 Sulawesi Selatan Toraja Utara Sesean Suloara 4.91 7 381 1 503 2.09 0.40 Annex II – Demand forecast results Page 7 of 12 District ID Province Regency District habitants/household Population # Households Energy demand (GWh) Peak demand (MW) 7326160 Sulawesi Selatan Toraja Utara Kapala Pitu 4.57 7 151 1 564 2.18 0.42 7326170 Sulawesi Selatan Toraja Utara Dende Piongan Napo 4.67 9 444 2 021 2.81 0.54 7326180 Sulawesi Selatan Toraja Utara Awan Rante Karua 5.24 6 149 1 173 1.63 0.31 7326190 Sulawesi Selatan Toraja Utara Rindingalo 4.67 8 587 1 839 2.56 0.49 7326200 Sulawesi Selatan Toraja Utara Buntu Pepasan 5.31 14 473 2 728 3.80 0.73 7326210 Sulawesi Selatan Toraja Utara Baruppu 4.52 6 342 1 403 1.95 0.37 7371010 Sulawesi Selatan Makassar Mariso 4.71 66 652 14 152 19.69 3.77 7371020 Sulawesi Selatan Makassar Mamajang 4.57 69 990 15 320 21.32 4.08 7371030 Sulawesi Selatan Makassar Tamalate 4.15 201 080 48 416 67.36 12.89 7371031 Sulawesi Selatan Makassar Rappocini 4.53 179 145 39 574 55.06 10.53 7371040 Sulawesi Selatan Makassar Makassar 4.79 96 937 20 250 28.17 5.39 7371050 Sulawesi Selatan Makassar Ujung Pandang 4.87 32 201 6 610 9.20 1.76 7371060 Sulawesi Selatan Makassar Wajo 4.96 35 118 7 087 9.86 1.89 7371070 Sulawesi Selatan Makassar Bontoala 4.86 64 231 13 208 18.38 3.52 7371080 Sulawesi Selatan Makassar Ujung Tanah 4.95 55 358 11 193 15.57 2.98 7371090 Sulawesi Selatan Makassar Tallo 4.91 158 382 32 263 44.89 8.59 7371100 Sulawesi Selatan Makassar Panakkukang 4.31 167 506 38 874 54.09 10.35 7371101 Sulawesi Selatan Makassar Manggala 4.65 138 839 29 876 41.57 7.95 7371110 Sulawesi Selatan Makassar Biring Kanaya 4.29 198 657 46 319 64.44 12.33 7371111 Sulawesi Selatan Makassar Tamalanrea 3.40 120 335 35 430 49.29 9.43 7372010 Sulawesi Selatan Pare-Pare Bacukiki 4.37 17 135 3 919 5.45 1.04 7372011 Sulawesi Selatan Pare-Pare Bacukiki Barat 4.46 46 261 10 383 14.45 2.76 7372020 Sulawesi Selatan Pare-Pare Ujung 4.49 38 149 8 506 11.83 2.26 7372030 Sulawesi Selatan Pare-Pare Soreang 4.52 51 450 11 374 15.82 3.03 7373010 Sulawesi Selatan Palopo Wara Selatan 4.31 11 983 2 781 3.87 0.74 7373011 Sulawesi Selatan Palopo Sendana 5.01 6 785 1 356 1.89 0.36 7373020 Sulawesi Selatan Palopo Wara 4.26 36 720 8 618 11.99 2.29 7373021 Sulawesi Selatan Palopo Wara Timur 4.64 36 688 7 902 10.99 2.10 7373022 Sulawesi Selatan Palopo Mungkajang 4.72 8 263 1 751 2.44 0.47 7373030 Sulawesi Selatan Palopo Wara Utara 4.83 22 502 4 657 6.48 1.24 7373031 Sulawesi Selatan Palopo Bara 4.68 27 174 5 811 8.08 1.55 7373040 Sulawesi Selatan Palopo Telluwanua 4.84 13 850 2 860 3.98 0.76 7373041 Sulawesi Selatan Palopo Wara Barat 4.65 11 130 2 394 3.33 0.64 7401050 Sulawesi Tenggara Buton Lasalimu 4.25 14 262 3 353 4.64 0.91 7401051 Sulawesi Tenggara Buton Lasalimu Selatan 4.58 17 762 3 883 5.38 1.05 7401052 Sulawesi Tenggara Buton Siontapina 5.02 16 864 3 360 4.65 0.91 7401060 Sulawesi Tenggara Buton Pasar Wajo 5.52 51 375 9 316 12.90 2.52 7401061 Sulawesi Tenggara Buton Wolowa 5.54 6 856 1 238 1.71 0.33 7401062 Sulawesi Tenggara Buton Wabula 5.15 6 915 1 342 1.86 0.36 7401070 Sulawesi Tenggara Buton Sampolawa 5.40 27 888 5 165 7.15 1.40 7401071 Sulawesi Tenggara Buton Batu Atas 5.80 11 429 1 971 2.73 0.53 7401072 Sulawesi Tenggara Buton Lapandewa 5.81 10 772 1 854 2.57 0.50 7401080 Sulawesi Tenggara Buton Batauga 4.85 19 395 4 001 5.54 1.08 7401081 Sulawesi Tenggara Buton Siompu 4.75 12 132 2 555 3.54 0.69 7401082 Sulawesi Tenggara Buton Kadatua 4.83 10 677 2 210 3.06 0.60 7401083 Sulawesi Tenggara Buton Siompu Barat 5.39 11 253 2 089 2.89 0.57 7401110 Sulawesi Tenggara Buton Kapontori 4.25 17 490 4 117 5.70 1.11 7401120 Sulawesi Tenggara Buton Gu 4.26 21 949 5 156 7.14 1.39 7401121 Sulawesi Tenggara Buton Sangia Wambulu 4.36 6 935 1 590 2.20 0.43 7401130 Sulawesi Tenggara Buton Lakudo 4.49 28 012 6 239 8.64 1.69 7401140 Sulawesi Tenggara Buton Mawasangka 4.61 30 567 6 630 9.18 1.79 7401141 Sulawesi Tenggara Buton Mawasangka Timur 4.13 6 707 1 626 2.25 0.44 7401142 Sulawesi Tenggara Buton Mawasangka Tengah 4.64 12 678 2 734 3.79 0.74 7401151 Sulawesi Tenggara Buton Talaga Raya 4.79 12 506 2 613 3.62 0.71 7402010 Sulawesi Tenggara Muna Tongkuno 4.36 19 931 4 567 6.33 1.24 7402011 Sulawesi Tenggara Muna Tongkuno Selatan 4.24 7 296 1 721 2.38 0.47 7402020 Sulawesi Tenggara Muna Parigi 4.35 15 113 3 478 4.82 0.94 7402021 Sulawesi Tenggara Muna Bone 4.36 7 115 1 631 2.26 0.44 7402022 Sulawesi Tenggara Muna Marobo 5.20 8 477 1 632 2.26 0.44 7402030 Sulawesi Tenggara Muna Kabawo 4.69 16 871 3 596 4.98 0.97 7402031 Sulawesi Tenggara Muna Kabangka 4.20 12 680 3 019 4.18 0.82 7402032 Sulawesi Tenggara Muna Kontukowuna 4.53 5 179 1 143 1.58 0.31 7402040 Sulawesi Tenggara Muna Tiworo Kepulauan 4.20 8 879 2 116 2.93 0.57 7402041 Sulawesi Tenggara Muna Maginti 4.41 11 402 2 588 3.58 0.70 7402042 Sulawesi Tenggara Muna Tiworo Tengah 4.02 9 014 2 243 3.11 0.61 7402043 Sulawesi Tenggara Muna Tiworo Selatan 4.15 6 695 1 614 2.24 0.44 7402044 Sulawesi Tenggara Muna Tiworo Utara 4.94 6 741 1 365 1.89 0.37 7402050 Sulawesi Tenggara Muna Lawa 4.23 10 298 2 433 3.37 0.66 7402051 Sulawesi Tenggara Muna Sawerigadi 4.34 8 710 2 008 2.78 0.54 7402052 Sulawesi Tenggara Muna Barangka 4.28 8 286 1 937 2.68 0.52 7402053 Sulawesi Tenggara Muna Wa Daga 4.36 7 909 1 813 2.51 0.49 7402060 Sulawesi Tenggara Muna Kusambi 4.57 14 829 3 248 4.50 0.88 7402061 Sulawesi Tenggara Muna Kontunaga 4.34 10 560 2 432 3.37 0.66 7402062 Sulawesi Tenggara Muna Watopute 4.33 16 195 3 739 5.18 1.01 7402070 Sulawesi Tenggara Muna Katobu 4.81 39 307 8 167 11.31 2.21 7402071 Sulawesi Tenggara Muna Lohia 4.59 18 409 4 007 5.55 1.08 7402072 Sulawesi Tenggara Muna Duruka 4.50 15 533 3 456 4.79 0.93 7402073 Sulawesi Tenggara Muna Batalaiworu 4.64 17 520 3 776 5.23 1.02 7402080 Sulawesi Tenggara Muna Napabalano 4.54 14 949 3 291 4.56 0.89 7402081 Sulawesi Tenggara Muna Lasalepa 4.18 13 867 3 319 4.60 0.90 7402082 Sulawesi Tenggara Muna Napano Kusambi 4.74 6 524 1 375 1.90 0.37 7402083 Sulawesi Tenggara Muna Towea 4.52 6 545 1 448 2.01 0.39 7402090 Sulawesi Tenggara Muna Wakorumba Selatan 4.65 5 834 1 256 1.74 0.34 Annex II – Demand forecast results Page 8 of 12 District ID Province Regency District habitants/household Population # Households Energy demand (GWh) Peak demand (MW) 7402091 Sulawesi Tenggara Muna Pasir Putih 4.65 5 643 1 213 1.68 0.33 7402092 Sulawesi Tenggara Muna Pasi Kolaga 4.59 5 345 1 166 1.62 0.32 7402111 Sulawesi Tenggara Muna Maligano 4.61 7 080 1 536 2.13 0.42 7402112 Sulawesi Tenggara Muna Batukara 4.39 3 111 709 0.98 0.19 7403071 Sulawesi Tenggara Konawe Wawonii Selatan 4.22 4 541 1 076 1.49 0.29 7403072 Sulawesi Tenggara Konawe Wawonii Barat 4.49 8 885 1 981 2.74 0.54 7403073 Sulawesi Tenggara Konawe Wawonii Tengah 4.96 4 145 836 1.16 0.23 7403074 Sulawesi Tenggara Konawe Wawonii Tenggara 4.84 7 352 1 521 2.11 0.41 7403081 Sulawesi Tenggara Konawe Wawonii Timur 4.13 3 901 945 1.31 0.26 7403082 Sulawesi Tenggara Konawe Wawonii Utara 4.06 7 023 1 732 2.40 0.47 7403083 Sulawesi Tenggara Konawe Wawonii Timur Laut 3.95 4 274 1 083 1.50 0.29 7403090 Sulawesi Tenggara Konawe Soropia 4.30 10 746 2 501 3.46 0.68 7403091 Sulawesi Tenggara Konawe Lalonggasumeeto 4.45 6 393 1 437 1.99 0.39 7403100 Sulawesi Tenggara Konawe Sampara 4.81 16 229 3 371 4.67 0.91 7403101 Sulawesi Tenggara Konawe Bondoala 4.34 11 364 2 621 3.63 0.71 7403102 Sulawesi Tenggara Konawe Besulutu 4.35 9 368 2 153 2.98 0.58 7403103 Sulawesi Tenggara Konawe Kapoiala 4.27 5 632 1 320 1.83 0.36 7403130 Sulawesi Tenggara Konawe Lambuya 4.40 9 155 2 081 2.88 0.56 7403131 Sulawesi Tenggara Konawe Uepai 4.45 16 382 3 678 5.09 0.99 7403132 Sulawesi Tenggara Konawe Puriala 4.53 10 264 2 268 3.14 0.61 7403133 Sulawesi Tenggara Konawe Onembute 4.04 8 235 2 039 2.82 0.55 7403140 Sulawesi Tenggara Konawe Pondidaha 4.51 14 466 3 206 4.44 0.87 7403141 Sulawesi Tenggara Konawe Wonggeduku 4.61 27 467 5 965 8.26 1.61 7403142 Sulawesi Tenggara Konawe Amonggedo 4.16 12 865 3 090 4.28 0.84 7403150 Sulawesi Tenggara Konawe Wawotobi 4.69 27 966 5 967 8.26 1.61 7403151 Sulawesi Tenggara Konawe Meluhu 4.12 6 914 1 679 2.33 0.45 7403152 Sulawesi Tenggara Konawe Konawe 5.08 11 137 2 192 3.04 0.59 7403170 Sulawesi Tenggara Konawe Unaaha 4.49 31 454 7 010 9.71 1.90 7403171 Sulawesi Tenggara Konawe Anggaberi 4.76 8 524 1 793 2.48 0.48 7403180 Sulawesi Tenggara Konawe Abuki 4.29 19 969 4 654 6.45 1.26 7403181 Sulawesi Tenggara Konawe Latoma 4.37 3 276 751 1.04 0.20 7403182 Sulawesi Tenggara Konawe Tongauna 4.55 21 416 4 710 6.52 1.27 7403183 Sulawesi Tenggara Konawe Asinua 4.04 3 438 852 1.18 0.23 7403193 Sulawesi Tenggara Konawe Routa 4.73 2 623 555 0.77 0.15 7404010 Sulawesi Tenggara Kolaka Watubangga 4.04 19 639 4 857 6.73 1.31 7404011 Sulawesi Tenggara Kolaka Tanggetada 4.42 18 448 4 177 5.79 1.13 7404012 Sulawesi Tenggara Kolaka Toari 4.18 12 371 2 961 4.10 0.80 7404013 Sulawesi Tenggara Kolaka Polinggona 3.96 9 005 2 276 3.15 0.62 7404020 Sulawesi Tenggara Kolaka Pomalaa 4.65 39 084 8 412 11.65 2.28 7404030 Sulawesi Tenggara Kolaka Wundulako 4.81 25 763 5 357 7.42 1.45 7404031 Sulawesi Tenggara Kolaka Baula 4.55 14 035 3 086 4.27 0.83 7404040 Sulawesi Tenggara Kolaka Ladongi 4.00 33 012 8 257 11.44 2.23 7404041 Sulawesi Tenggara Kolaka Lambadia 3.95 38 660 9 789 13.56 2.65 7404042 Sulawesi Tenggara Kolaka Poli-Polia 4.05 14 700 3 633 5.03 0.98 7404050 Sulawesi Tenggara Kolaka Tirawuta 4.44 17 302 3 899 5.40 1.05 7404051 Sulawesi Tenggara Kolaka Lalolae 4.74 4 910 1 036 1.43 0.28 7404052 Sulawesi Tenggara Kolaka Loea 4.31 8 558 1 985 2.75 0.54 7404060 Sulawesi Tenggara Kolaka Kolaka 4.48 50 100 11 188 15.50 3.03 7404061 Sulawesi Tenggara Kolaka Latambaga 4.97 38 196 7 692 10.65 2.08 7404070 Sulawesi Tenggara Kolaka Wolo 4.65 33 615 7 237 10.02 1.96 7404071 Sulawesi Tenggara Kolaka Samaturu 4.53 29 169 6 444 8.93 1.74 7404080 Sulawesi Tenggara Kolaka Mowewe 4.39 10 448 2 379 3.30 0.64 7404081 Sulawesi Tenggara Kolaka Uluiwoi 4.41 10 038 2 279 3.16 0.62 7404082 Sulawesi Tenggara Kolaka Tinondo 4.34 9 867 2 272 3.15 0.61 7405010 Sulawesi Tenggara Konawe Selatan Tinanggea 4.46 29 550 6 628 9.18 1.79 7405011 Sulawesi Tenggara Konawe Selatan Lalembuu 3.80 21 626 5 689 7.88 1.54 7405020 Sulawesi Tenggara Konawe Selatan Andoolo 4.17 22 614 5 424 7.51 1.47 7405021 Sulawesi Tenggara Konawe Selatan Buke 3.77 18 346 4 868 6.74 1.32 7405030 Sulawesi Tenggara Konawe Selatan Palangga 4.48 17 030 3 798 5.26 1.03 7405031 Sulawesi Tenggara Konawe Selatan Palangga Selatan 4.70 8 509 1 812 2.51 0.49 7405032 Sulawesi Tenggara Konawe Selatan Baito 4.22 10 481 2 483 3.44 0.67 7405040 Sulawesi Tenggara Konawe Selatan Lainea 4.26 12 294 2 885 4.00 0.78 7405041 Sulawesi Tenggara Konawe Selatan Laeya 4.44 26 341 5 937 8.22 1.61 7405050 Sulawesi Tenggara Konawe Selatan Kolono 4.39 18 853 4 294 5.95 1.16 7405060 Sulawesi Tenggara Konawe Selatan Laonti 4.45 13 090 2 942 4.07 0.80 7405070 Sulawesi Tenggara Konawe Selatan Moramo 4.11 17 985 4 382 6.07 1.19 7405071 Sulawesi Tenggara Konawe Selatan Moramo Utara 4.31 9 944 2 306 3.19 0.62 7405080 Sulawesi Tenggara Konawe Selatan Konda 4.45 25 130 5 649 7.82 1.53 7405081 Sulawesi Tenggara Konawe Selatan Wolasi 4.09 6 556 1 603 2.22 0.43 7405090 Sulawesi Tenggara Konawe Selatan Ranomeeto 4.46 22 486 5 047 6.99 1.37 7405091 Sulawesi Tenggara Konawe Selatan Ranomeeto Barat 4.54 9 033 1 991 2.76 0.54 7405100 Sulawesi Tenggara Konawe Selatan Landono 4.39 15 898 3 625 5.02 0.98 7405101 Sulawesi Tenggara Konawe Selatan Mowila 4.38 15 507 3 538 4.90 0.96 7405110 Sulawesi Tenggara Konawe Selatan Angata 4.58 20 659 4 508 6.24 1.22 7405111 Sulawesi Tenggara Konawe Selatan Benua 4.12 13 492 3 273 4.53 0.89 7405112 Sulawesi Tenggara Konawe Selatan Basala 3.95 11 303 2 865 3.97 0.77 7406010 Sulawesi Tenggara Bombana Kabaena 3.68 3 949 1 073 1.49 0.29 7406011 Sulawesi Tenggara Bombana Kabaena Utara 4.14 5 089 1 230 1.70 0.33 7406012 Sulawesi Tenggara Bombana Kabaena Selatan 3.43 3 612 1 054 1.46 0.29 7406013 Sulawesi Tenggara Bombana Kabaena Barat 4.36 10 384 2 384 3.30 0.64 7406020 Sulawesi Tenggara Bombana Kabaena Timur 4.37 9 235 2 114 2.93 0.57 7406021 Sulawesi Tenggara Bombana Kabaena Tengah 3.89 4 511 1 159 1.61 0.31 7406030 Sulawesi Tenggara Bombana Rumbia 4.24 14 845 3 500 4.85 0.95 Annex II – Demand forecast results Page 9 of 12 District ID Province Regency District habitants/household Population # Households Energy demand (GWh) Peak demand (MW) 7406031 Sulawesi Tenggara Bombana Mata Oleo 4.32 8 444 1 953 2.71 0.53 7406032 Sulawesi Tenggara Bombana Kep. Masaloka Raya 4.34 4 128 951 1.32 0.26 7406033 Sulawesi Tenggara Bombana Rumbia Tengah 4.50 8 810 1 960 2.71 0.53 7406040 Sulawesi Tenggara Bombana Rarowatu 4.45 8 628 1 941 2.69 0.52 7406041 Sulawesi Tenggara Bombana Rarowatu Utara 5.08 10 200 2 009 2.78 0.54 7406042 Sulawesi Tenggara Bombana Mata Usu 3.84 1 752 457 0.63 0.12 7406043 Sulawesi Tenggara Bombana Lantari Jaya 4.36 10 423 2 391 3.31 0.65 7406050 Sulawesi Tenggara Bombana Poleang Timur 4.70 12 626 2 685 3.72 0.73 7406051 Sulawesi Tenggara Bombana Poleang Utara 4.40 14 490 3 291 4.56 0.89 7406052 Sulawesi Tenggara Bombana Poleang Selatan 4.72 9 151 1 940 2.69 0.52 7406053 Sulawesi Tenggara Bombana Poleang Tenggara 4.84 5 204 1 076 1.49 0.29 7406060 Sulawesi Tenggara Bombana Poleang 4.73 19 788 4 186 5.80 1.13 7406061 Sulawesi Tenggara Bombana Poleang Barat 4.34 15 619 3 599 4.98 0.97 7406062 Sulawesi Tenggara Bombana Tontonunu 4.37 7 278 1 666 2.31 0.45 7406063 Sulawesi Tenggara Bombana Poleang Tengah 4.67 4 824 1 033 1.43 0.28 7407010 Sulawesi Tenggara Wakatobi Binongko 4.29 11 622 2 709 3.75 0.73 7407011 Sulawesi Tenggara Wakatobi Togo Binongko 4.37 6 516 1 491 2.07 0.40 7407020 Sulawesi Tenggara Wakatobi Tomia 3.95 9 574 2 426 3.36 0.66 7407021 Sulawesi Tenggara Wakatobi Tomia Timur 3.89 11 726 3 014 4.17 0.82 7407030 Sulawesi Tenggara Wakatobi Kaledupa 3.97 13 859 3 495 4.84 0.95 7407031 Sulawesi Tenggara Wakatobi Kaledupa Selatan 3.73 9 209 2 472 3.42 0.67 7407040 Sulawesi Tenggara Wakatobi Wangi-Wangi 4.32 32 380 7 500 10.39 2.03 7407050 Sulawesi Tenggara Wakatobi Wangi-Wangi Selatan 4.52 34 009 7 529 10.43 2.04 7408010 Sulawesi Tenggara Kolaka Utara Ranteangin 4.72 7 348 1 556 2.16 0.42 7408011 Sulawesi Tenggara Kolaka Utara Lambai 4.87 7 357 1 510 2.09 0.41 7408012 Sulawesi Tenggara Kolaka Utara Wawo 4.69 7 783 1 660 2.30 0.45 7408020 Sulawesi Tenggara Kolaka Utara Lasusua 4.50 30 154 6 699 9.28 1.81 7408021 Sulawesi Tenggara Kolaka Utara Katoi 4.55 7 988 1 757 2.43 0.48 7408030 Sulawesi Tenggara Kolaka Utara Kodeoha 4.21 14 753 3 507 4.86 0.95 7408031 Sulawesi Tenggara Kolaka Utara Tiwu 4.30 5 603 1 304 1.81 0.35 7408040 Sulawesi Tenggara Kolaka Utara Ngapa 3.92 24 055 6 137 8.50 1.66 7408041 Sulawesi Tenggara Kolaka Utara Watunohu 4.43 8 610 1 945 2.69 0.53 7408050 Sulawesi Tenggara Kolaka Utara Pakue 4.44 12 953 2 915 4.04 0.79 7408051 Sulawesi Tenggara Kolaka Utara Pakue Utara 4.25 9 655 2 271 3.15 0.61 7408052 Sulawesi Tenggara Kolaka Utara Pakue Tengah 4.18 8 499 2 034 2.82 0.55 7408060 Sulawesi Tenggara Kolaka Utara Batu Putih 4.49 10 218 2 278 3.16 0.62 7408061 Sulawesi Tenggara Kolaka Utara Porehu 3.94 9 614 2 441 3.38 0.66 7408062 Sulawesi Tenggara Kolaka Utara Tolala 4.52 3 594 796 1.10 0.22 7409100 Sulawesi Tenggara Buton Utara Bonegunu 4.49 10 710 2 387 3.31 0.65 7409101 Sulawesi Tenggara Buton Utara Kambowa 4.81 8 627 1 795 2.49 0.49 7409110 Sulawesi Tenggara Buton Utara Wakorumba 4.74 9 028 1 906 2.64 0.52 7409120 Sulawesi Tenggara Buton Utara Kulisusu 4.84 28 624 5 912 8.19 1.60 7409121 Sulawesi Tenggara Buton Utara Kulisusu Barat 4.43 8 071 1 822 2.52 0.49 7409122 Sulawesi Tenggara Buton Utara Kulisusu Utara 4.54 10 807 2 382 3.30 0.64 7410010 Sulawesi Tenggara Konawe Utara Sawa 4.50 9 848 2 188 3.03 0.59 7410020 Sulawesi Tenggara Konawe Utara Lembo 4.37 6 021 1 380 1.91 0.37 7410030 Sulawesi Tenggara Konawe Utara Lasolo 4.70 14 502 3 086 4.27 0.83 7410040 Sulawesi Tenggara Konawe Utara Molawe 5.36 7 502 1 399 1.94 0.38 7410050 Sulawesi Tenggara Konawe Utara Asera 4.86 19 051 3 919 5.43 1.06 7410060 Sulawesi Tenggara Konawe Utara Langgikima 4.27 5 542 1 299 1.80 0.35 7410070 Sulawesi Tenggara Konawe Utara Wiwirano 4.22 8 962 2 122 2.94 0.57 7471010 Sulawesi Tenggara Kendari Mandonga 4.52 50 122 11 080 15.35 3.00 7471011 Sulawesi Tenggara Kendari Baruga 4.03 26 845 6 666 9.23 1.80 7471012 Sulawesi Tenggara Kendari Puuwatu 4.65 38 461 8 264 11.45 2.24 7471013 Sulawesi Tenggara Kendari Kadia 4.03 54 393 13 510 18.71 3.65 7471014 Sulawesi Tenggara Kendari Wua-Wua 4.55 33 829 7 428 10.29 2.01 7471020 Sulawesi Tenggara Kendari Poasia 4.66 34 619 7 437 10.30 2.01 7471021 Sulawesi Tenggara Kendari Abeli 4.71 31 100 6 608 9.15 1.79 7471022 Sulawesi Tenggara Kendari Kambu 2.84 37 610 13 234 18.33 3.58 7471030 Sulawesi Tenggara Kendari Kendari 4.71 35 423 7 520 10.42 2.03 7471031 Sulawesi Tenggara Kendari Kendari Barat 4.55 59 499 13 069 18.10 3.53 7472010 Sulawesi Tenggara Bau-Bau Betoambari 4.35 22 569 5 188 7.19 1.40 7472011 Sulawesi Tenggara Bau-Bau Murhum 4.74 62 578 13 192 18.27 3.57 7472020 Sulawesi Tenggara Bau-Bau Wolio 4.69 52 632 11 212 15.53 3.03 7472021 Sulawesi Tenggara Bau-Bau Kokalukuna 4.79 23 197 4 848 6.71 1.31 7472030 Sulawesi Tenggara Bau-Bau Sorawolio 5.16 9 872 1 915 2.65 0.52 7472040 Sulawesi Tenggara Bau-Bau Bungi 4.74 9 836 2 074 2.87 0.56 7472041 Sulawesi Tenggara Bau-Bau Lea-Lea 4.37 9 190 2 102 2.91 0.57 7501031 Gorontalo Boalemo Mananggu 4.14 14 700 3 553 4.71 0.89 7501040 Gorontalo Boalemo Tilamuta 4.29 33 768 7 880 10.45 1.96 7501041 Gorontalo Boalemo Dulupi 4.40 19 458 4 418 5.86 1.10 7501042 Gorontalo Boalemo Botumoito 4.22 18 057 4 284 5.68 1.07 7501050 Gorontalo Boalemo Paguyaman 4.12 38 032 9 238 12.25 2.30 7501051 Gorontalo Boalemo Wonosari 3.95 31 724 8 031 10.65 2.00 7501052 Gorontalo Boalemo Paguyaman Pantai 3.97 9 481 2 387 3.17 0.59 7502010 Gorontalo Gorontalo Batudaa Pantai 4.34 13 913 3 203 4.25 0.80 7502011 Gorontalo Gorontalo Biluhu 4.38 9 716 2 221 2.95 0.55 7502020 Gorontalo Gorontalo Batudaa 4.90 16 508 3 373 4.47 0.84 7502021 Gorontalo Gorontalo Bongomeme 4.58 42 506 9 279 12.31 2.31 7502022 Gorontalo Gorontalo Tabongo 4.15 20 726 4 990 6.62 1.24 7502030 Gorontalo Gorontalo Tibawa 4.56 48 199 10 579 14.03 2.64 7502031 Gorontalo Gorontalo Pulubala 4.38 28 492 6 500 8.62 1.62 7502040 Gorontalo Gorontalo Boliyohuto 4.17 31 007 7 432 9.86 1.85 Annex II – Demand forecast results Page 10 of 12 District ID Province Regency District habitants/household Population # Households Energy demand (GWh) Peak demand (MW) 7502041 Gorontalo Gorontalo Mootilango 4.26 22 501 5 287 7.01 1.32 7502042 Gorontalo Gorontalo Tolangohula 4.17 27 277 6 543 8.68 1.63 7502043 Gorontalo Gorontalo Asparaga 4.37 15 733 3 600 4.77 0.90 7502070 Gorontalo Gorontalo Limboto 4.28 58 320 13 618 18.06 3.39 7502071 Gorontalo Gorontalo Limboto Barat 4.59 30 010 6 539 8.67 1.63 7502080 Gorontalo Gorontalo Telaga 4.53 26 464 5 845 7.75 1.46 7502081 Gorontalo Gorontalo Telaga Biru 4.62 33 915 7 338 9.73 1.83 7502082 Gorontalo Gorontalo Tilango 4.06 16 445 4 051 5.37 1.01 7502083 Gorontalo Gorontalo Telaga Jaya 4.44 13 315 2 998 3.98 0.75 7503010 Gorontalo Pohuwato Popayato 4.30 11 721 2 727 3.62 0.68 7503011 Gorontalo Pohuwato Popayato Barat 4.50 8 526 1 896 2.51 0.47 7503012 Gorontalo Pohuwato Popayato Timur 4.12 9 858 2 392 3.17 0.60 7503020 Gorontalo Pohuwato Lemito 4.61 13 407 2 906 3.85 0.72 7503021 Gorontalo Pohuwato Wanggarasi 4.33 5 846 1 352 1.79 0.34 7503030 Gorontalo Pohuwato Marisa 4.09 22 600 5 520 7.32 1.38 7503031 Gorontalo Pohuwato Patilanggio 4.58 11 103 2 425 3.22 0.60 7503032 Gorontalo Pohuwato Buntulia 4.56 13 414 2 939 3.90 0.73 7503033 Gorontalo Pohuwato Duhiadaa 4.47 13 629 3 047 4.04 0.76 7503040 Gorontalo Pohuwato Randangan 4.18 19 168 4 587 6.08 1.14 7503041 Gorontalo Pohuwato Taluditi 3.79 9 265 2 442 3.24 0.61 7503050 Gorontalo Pohuwato Paguat 4.28 19 132 4 473 5.93 1.11 7503051 Gorontalo Pohuwato Dengilo 4.45 6 908 1 552 2.06 0.39 7504010 Gorontalo Bone Bolango Tapa 4.09 8 783 2 151 2.85 0.54 7504011 Gorontalo Bone Bolango Bulango Utara 3.76 8 863 2 357 3.13 0.59 7504012 Gorontalo Bone Bolango Bulango Selatan 4.37 12 413 2 842 3.77 0.71 7504013 Gorontalo Bone Bolango Bulango Timur 4.34 6 385 1 471 1.95 0.37 7504014 Gorontalo Bone Bolango Bulango Ulu 4.34 4 617 1 065 1.41 0.27 7504020 Gorontalo Bone Bolango Kabila 4.12 26 849 6 515 8.64 1.62 7504021 Gorontalo Bone Bolango Botu Pingge 4.17 7 156 1 717 2.28 0.43 7504022 Gorontalo Bone Bolango Tilongkabila 4.03 21 180 5 256 6.97 1.31 7504030 Gorontalo Bone Bolango Suwawa 4.59 13 662 2 976 3.95 0.74 7504031 Gorontalo Bone Bolango Suwawa Selatan 4.31 6 131 1 423 1.89 0.35 7504032 Gorontalo Bone Bolango Suwawa Timur 4.02 8 409 2 091 2.77 0.52 7504033 Gorontalo Bone Bolango Suwawa Tengah 3.95 7 307 1 852 2.46 0.46 7504040 Gorontalo Bone Bolango Bonepantai 4.56 12 497 2 744 3.64 0.68 7504041 Gorontalo Bone Bolango Kabila Bone 4.74 12 470 2 634 3.49 0.66 7504042 Gorontalo Bone Bolango Bone Raya 4.37 7 511 1 721 2.28 0.43 7504043 Gorontalo Bone Bolango Bone 4.37 11 088 2 539 3.37 0.63 7504044 Gorontalo Bone Bolango Bulawa 4.80 6 089 1 270 1.68 0.32 7505010 Gorontalo Gorontalo Utara Atinggola 3.95 13 165 3 330 4.42 0.83 7505011 Gorontalo Gorontalo Utara Gentuma Raya 4.26 10 191 2 394 3.17 0.60 7505020 Gorontalo Gorontalo Utara Kwandang 4.16 45 972 11 062 14.67 2.76 7505030 Gorontalo Gorontalo Utara Anggrek 4.46 25 859 5 795 7.69 1.44 7505040 Gorontalo Gorontalo Utara Sumalata 4.03 20 501 5 082 6.74 1.27 7505050 Gorontalo Gorontalo Utara Tolinggula 4.30 17 422 4 055 5.38 1.01 7571010 Gorontalo Gorontalo Kota Barat 4.19 25 846 6 168 8.18 1.54 7571011 Gorontalo Gorontalo Dungingi 4.21 27 569 6 541 8.67 1.63 7571020 Gorontalo Gorontalo Kota Selatan 4.03 46 002 11 401 15.12 2.84 7571021 Gorontalo Gorontalo Kota Timur 4.21 53 885 12 787 16.96 3.19 7571030 Gorontalo Gorontalo Kota Utara 4.28 42 373 9 912 13.15 2.47 7571031 Gorontalo Gorontalo Kota Tengah 3.71 34 573 9 311 12.35 2.32 7601010 Sulawesi Barat Majene Banggae 5.06 49 878 9 848 10.54 2.36 7601011 Sulawesi Barat Majene Banggae Timur 4.57 38 143 8 343 8.93 2.00 7601020 Sulawesi Barat Majene Pamboang 5.08 27 789 5 475 5.86 1.31 7601030 Sulawesi Barat Majene Sendana 4.89 27 220 5 565 5.95 1.33 7601031 Sulawesi Barat Majene Tammerodo 4.61 14 141 3 071 3.29 0.73 7601033 Sulawesi Barat Majene Tubo Sendana 4.93 10 974 2 226 2.38 0.53 7601040 Sulawesi Barat Majene Malunda 4.70 22 694 4 829 5.17 1.16 7601041 Sulawesi Barat Majene Ulumanda 5.10 11 044 2 166 2.32 0.52 7602010 Sulawesi Barat Polewali Mandar Tinambung 4.78 29 816 6 236 6.67 1.49 7602011 Sulawesi Barat Polewali Mandar Balanipa 4.80 32 093 6 689 7.16 1.60 7602012 Sulawesi Barat Polewali Mandar Limboro 4.29 22 687 5 287 5.66 1.27 7602020 Sulawesi Barat Polewali Mandar Tubbi Taramanu 4.46 24 413 5 473 5.85 1.31 7602021 Sulawesi Barat Polewali Mandar Alu 4.49 16 006 3 569 3.82 0.85 7602030 Sulawesi Barat Polewali Mandar Campalagian 4.62 69 883 15 131 16.19 3.62 7602031 Sulawesi Barat Polewali Mandar Luyo 4.59 35 661 7 763 8.30 1.86 7602040 Sulawesi Barat Polewali Mandar Wonomulyo 4.20 60 480 14 393 15.40 3.44 7602041 Sulawesi Barat Polewali Mandar Mapilli 4.57 36 367 7 950 8.50 1.90 7602042 Sulawesi Barat Polewali Mandar Tapango 4.18 28 714 6 865 7.34 1.64 7602043 Sulawesi Barat Polewali Mandar Matakali 4.50 28 471 6 327 6.77 1.51 7602044 Sulawesi Barat Polewali Mandar Bulo 4.40 11 534 2 624 2.81 0.63 7602050 Sulawesi Barat Polewali Mandar Polewali 4.58 73 271 16 007 17.12 3.83 7602051 Sulawesi Barat Polewali Mandar Binuang 4.57 40 754 8 921 9.54 2.13 7602052 Sulawesi Barat Polewali Mandar Anreapi 4.60 12 389 2 694 2.88 0.64 7602061 Sulawesi Barat Polewali Mandar Matangnga 4.26 6 687 1 572 1.68 0.38 7603010 Sulawesi Barat Mamasa Sumarorong 4.30 12 799 2 974 3.18 0.71 7603020 Sulawesi Barat Mamasa Messawa 3.87 9 473 2 448 2.62 0.59 7603030 Sulawesi Barat Mamasa Pana 4.55 11 426 2 512 2.69 0.60 7603031 Sulawesi Barat Mamasa Nosu 4.11 5 713 1 391 1.49 0.33 7603040 Sulawesi Barat Mamasa Tabang 4.76 7 870 1 655 1.77 0.40 7603050 Sulawesi Barat Mamasa Mamasa 4.48 30 115 6 729 7.20 1.61 7603060 Sulawesi Barat Mamasa Tanduk Kalua 4.47 13 339 2 983 3.19 0.71 7603061 Sulawesi Barat Mamasa Balla 3.72 8 039 2 164 2.32 0.52 Annex II – Demand forecast results Page 11 of 12 District ID Province Regency District habitants/household Population # Households Energy demand (GWh) Peak demand (MW) 7603070 Sulawesi Barat Mamasa Sesenapadang 4.51 10 300 2 284 2.44 0.55 7603071 Sulawesi Barat Mamasa Tawalian 4.48 8 297 1 852 1.98 0.44 7603080 Sulawesi Barat Mamasa Mambi 4.56 12 419 2 726 2.92 0.65 7603081 Sulawesi Barat Mamasa Bambang 4.17 13 777 3 306 3.54 0.79 7603082 Sulawesi Barat Mamasa Rantebulahan Timur 4.25 7 592 1 787 1.91 0.43 7603083 Sulawesi Barat Mamasa Mehalaan 4.13 5 153 1 248 1.34 0.30 7603090 Sulawesi Barat Mamasa Aralle 4.71 8 797 1 867 2.00 0.45 7603091 Sulawesi Barat Mamasa Buntu Malangka 4.37 8 940 2 045 2.19 0.49 7603100 Sulawesi Barat Mamasa Tabulahan 4.45 13 109 2 945 3.15 0.70 7604010 Sulawesi Barat Mamuju Tapalang 4.96 24 159 4 872 5.21 1.17 7604011 Sulawesi Barat Mamuju Tapalang Barat 4.94 12 197 2 470 2.64 0.59 7604020 Sulawesi Barat Mamuju Mamuju 4.62 73 621 15 920 17.03 3.81 7604022 Sulawesi Barat Mamuju Simboro 4.61 30 996 6 726 7.20 1.61 7604023 Sulawesi Barat Mamuju Balabalakang 5.70 3 136 551 0.59 0.13 7604030 Sulawesi Barat Mamuju Kalukku 4.76 65 799 13 822 14.79 3.31 7604031 Sulawesi Barat Mamuju Papalang 4.46 28 584 6 405 6.85 1.53 7604032 Sulawesi Barat Mamuju Sampaga 3.99 18 686 4 679 5.01 1.12 7604033 Sulawesi Barat Mamuju Tommo 3.95 25 928 6 556 7.01 1.57 7604040 Sulawesi Barat Mamuju Kalumpang 4.27 14 429 3 378 3.61 0.81 7604041 Sulawesi Barat Mamuju Bonehau 4.38 11 520 2 630 2.81 0.63 7604050 Sulawesi Barat Mamuju Budong-Budong 4.29 30 492 7 115 7.61 1.70 7604051 Sulawesi Barat Mamuju Pangale 3.96 15 255 3 854 4.12 0.92 7604052 Sulawesi Barat Mamuju Topoyo 4.20 34 425 8 201 8.77 1.96 7604053 Sulawesi Barat Mamuju Karossa 4.58 29 398 6 419 6.87 1.54 7604054 Sulawesi Barat Mamuju Tobadak 4.15 31 580 7 608 8.14 1.82 7605010 Sulawesi Barat Mamuju Utara Sarudu 4.32 16 257 3 765 4.03 0.90 7605011 Sulawesi Barat Mamuju Utara Dapurang 4.25 15 405 3 629 3.88 0.87 7605012 Sulawesi Barat Mamuju Utara Duripoku 4.11 6 514 1 584 1.69 0.38 7605020 Sulawesi Barat Mamuju Utara Baras 4.17 20 516 4 920 5.26 1.18 7605021 Sulawesi Barat Mamuju Utara Bulu Taba 4.16 12 554 3 021 3.23 0.72 7605022 Sulawesi Barat Mamuju Utara Lariang 4.23 8 007 1 895 2.03 0.45 7605030 Sulawesi Barat Mamuju Utara Pasangkayu 4.09 30 576 7 467 7.99 1.79 7605031 Sulawesi Barat Mamuju Utara Tikke Raya 3.94 18 444 4 683 5.01 1.12 7605032 Sulawesi Barat Mamuju Utara Pedongga 3.84 8 769 2 287 2.45 0.55 7605040 Sulawesi Barat Mamuju Utara Bambalamotu 4.67 21 767 4 666 4.99 1.12 7605041 Sulawesi Barat Mamuju Utara Bambaira 4.60 11 520 2 504 2.68 0.60 7605042 Sulawesi Barat Mamuju Utara Sarjo 4.82 9 196 1 910 2.04 0.46 Annex II – Demand forecast results Page 12 of 12 NTT, Maluku and Maluku Utara demand forecast results Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 10000 8171031001 LAHA MALUKU 3 684 Phase 1 1 411 1 447 686 273.8 128.10005 -3.71052 10001 5314050010 TUNGANAMO NUSA TENGGARA TIMUR 2 139 Phase 1 531 373 293 80.5 123.20164 -10.63467 10002 5317030003 WAILA BUBUR NUSA TENGGARA TIMUR 3 564 Phase 1 662 465 386 100.4 119.03563 -9.52981 10003 5313121012 SATAR NGKELING NUSA TENGGARA TIMUR 565 Phase 1 132 112 068 24.2 120.47181 -8.55657 10004 5309072002 TUWAGOETOBI NUSA TENGGARA TIMUR 1 721 Phase 1 396 336 204 72.5 123.27743 -8.31733 10005 8105010020 FERUNI MALUKU 428 Phase 1 116 119 016 22.5 134.11951 -6.61252 10006 8101040012 LAURAN MALUKU 1 987 Phase 1 299 306 774 58.0 131.32572 -7.93559 10007 8204040012 BABANG MALUKU UTARA 3 166 Phase 1 760 779 760 157.1 127.60404 -0.62800 10008 8172040003 TUAL MALUKU 1 466 Phase 1 215 220 590 41.7 132.75213 -5.61843 10009 8108080021 YATOKE MALUKU 544 Phase 1 106 108 756 20.6 129.81205 -7.86212 10010 8171020009 KEL BATU MEJA MALUKU 6 Phase 1 2 2 052 0.4 128.19900 -3.69619 10011 5320040006 RAENYALE NUSA TENGGARA TIMUR 1 852 Phase 1 400 281 200 60.7 121.86176 -10.53701 10012 5301060010 KALEMBU KUNI NUSA TENGGARA TIMUR 4 272 Phase 1 621 436 563 94.2 119.45650 -9.64268 10013 5313121012 SATAR NGKELING NUSA TENGGARA TIMUR 140 Phase 1 33 28 017 6.0 120.46968 -8.55407 10014 5310041002 AIBURA NUSA TENGGARA TIMUR 1 899 Phase 1 426 361 674 78.0 122.34502 -8.67095 10015 8105010010 GAIMAR MALUKU 127 Phase 1 36 36 936 7.0 134.24790 -6.61574 10016 8101041009 ARUI DAS MALUKU 963 Phase 1 224 229 824 43.5 131.53173 -7.72707 10017 8204040022 SAYOANG MALUKU UTARA 1 505 Phase 1 336 344 736 69.5 127.60008 -0.62241 10018 8172040003 TUAL MALUKU 3 251 Phase 1 813 834 138 157.8 132.74325 -5.61561 10019 8108030003 TUTUWARU MALUKU 417 Phase 1 103 105 678 20.0 127.65171 -8.21204 10020 8171020007 WAIHOKA MALUKU 126 Phase 1 32 32 832 6.2 128.19957 -3.69610 10021 5314010015 OEBATU NUSA TENGGARA TIMUR 1 834 Phase 1 417 293 151 63.3 123.00635 -10.82106 10022 5302070011 KAMBAJAWA NUSA TENGGARA TIMUR 468 Phase 1 88 61 864 13.3 120.24019 -9.67042 10023 5313121012 SATAR NGKELING NUSA TENGGARA TIMUR 1 291 Phase 1 302 256 398 55.3 120.46596 -8.55483 10024 5308060015 MELUWITING NUSA TENGGARA TIMUR 1 473 Phase 1 376 319 224 68.9 123.74824 -8.25406 10025 8105010015 DOKA BARAT MALUKU 100 Phase 1 25 25 650 4.9 134.24891 -6.61278 10026 8101051002 RUMNGEUR MALUKU 42 Phase 1 11 11 286 2.1 131.90937 -7.07561 10027 8271021008 MARIKURUBU MALUKU UTARA 4 189 Phase 1 996 1 021 896 205.9 127.37325 0.78911 10028 8102010042 OHOIDERTAWUN MALUKU 898 Phase 1 207 212 382 40.2 132.68286 -5.60904 10029 8108040001 WAKARLELI MALUKU 555 Phase 1 131 134 406 25.4 127.78335 -8.17146 10030 8171020007 WAIHOKA MALUKU 5 771 Phase 1 1 443 1 480 518 280.0 128.20122 -3.69246 10031 5314020012 TOLAMA NUSA TENGGARA TIMUR 1 899 Phase 1 424 298 072 64.3 122.88602 -10.77819 10032 5302070011 KAMBAJAWA NUSA TENGGARA TIMUR 313 Phase 1 59 41 477 8.9 120.23646 -9.67029 10033 5313121016 WAE MULU NUSA TENGGARA TIMUR 1 919 Phase 1 428 363 372 78.4 120.46563 -8.54385 10034 5309073011 MANGAALENG NUSA TENGGARA TIMUR 839 Phase 1 259 219 891 47.4 123.20874 -8.29567 10035 8105010015 DOKA BARAT MALUKU 289 Phase 1 71 72 846 13.8 134.23719 -6.60079 10036 8101051002 RUMNGEUR MALUKU 44 Phase 1 12 12 312 2.3 131.90912 -7.07442 10037 8203040002 DOFA MALUKU UTARA 2 124 Phase 1 483 495 558 99.8 125.35435 -1.80608 10038 8102012005 OHOIRA MALUKU 1 161 Phase 1 127 130 302 24.6 132.70631 -5.83020 10039 8108020011 HILA MALUKU 1 334 Phase 1 299 306 774 58.0 127.29648 -7.52392 10040 8171020016 BATU MERAH MALUKU 359 Phase 1 84 86 184 16.3 128.20321 -3.68856 10041 5306020013 UPT HAREKAKAE NUSA TENGGARA TIMUR 1 664 Phase 1 355 249 565 53.8 124.93494 -9.55292 10042 5302081002 TEMU NUSA TENGGARA TIMUR 5 126 Phase 1 671 471 713 101.8 120.22463 -9.67491 10043 5313120030 COMPANG DALO NUSA TENGGARA TIMUR 45 Phase 1 10 8 490 1.8 120.38827 -8.60393 10044 5309073009 PEPAK KELU NUSA TENGGARA TIMUR 1 102 Phase 1 221 187 629 40.5 123.23793 -8.29091 10045 8105010017 LAININIR MALUKU 546 Phase 1 122 125 172 23.7 134.23736 -6.59812 10046 8101051002 RUMNGEUR MALUKU 231 Phase 1 59 60 534 11.4 131.90788 -7.06775 10047 8203063006 LANGGANU MALUKU UTARA 2 325 Phase 1 558 572 508 115.3 124.37177 -1.69788 10048 8102020015 OHOIWAIT MALUKU 1 102 Phase 1 142 145 692 27.6 132.94447 -5.72476 10049 8108070011 TEPA MALUKU 150 Phase 1 24 24 624 4.7 129.58586 -7.89185 10050 8171020016 BATU MERAH MALUKU 333 Phase 1 78 80 028 15.1 128.20880 -3.69065 10051 5320040007 RAEKORE NUSA TENGGARA TIMUR 1 473 Phase 1 338 237 614 51.3 121.90421 -10.53847 10052 5302070012 MBATAKAPIDU NUSA TENGGARA TIMUR 1 682 Phase 1 320 224 960 48.5 120.22445 -9.67580 10053 5313120030 COMPANG DALO NUSA TENGGARA TIMUR 420 Phase 1 88 74 712 16.1 120.38923 -8.60189 10054 5310070008 WULIWUTIK NUSA TENGGARA TIMUR 1 216 Phase 1 249 211 401 45.6 122.16167 -8.62536 10055 8105010020 FERUNI MALUKU 179 Phase 1 49 50 274 9.5 134.09378 -6.60533 10056 8101051003 AWEAR MALUKU 280 Phase 1 60 61 560 11.6 131.92083 -7.04736 10057 8203063003 LEDE MALUKU UTARA 1 689 Phase 1 441 452 466 91.2 124.36867 -1.70103 10058 8108070003 UPUHUPUN MALUKU 162 Phase 1 43 44 118 8.3 129.56302 -7.91377 10059 8102010042 OHOIDERTAWUN MALUKU 402 Phase 1 93 95 418 18.0 132.66702 -5.63133 10060 8171020016 BATU MERAH MALUKU 344 Phase 1 80 82 080 15.5 128.21527 -3.69197 10061 5304071008 NUNUNAMAT NUSA TENGGARA TIMUR 1 887 Phase 1 544 382 432 82.5 124.53781 -9.99750 10062 5317060018 LETEKAMOUNA NUSA TENGGARA TIMUR 1 961 Phase 1 367 258 001 55.7 119.34811 -9.55345 10063 5313120030 COMPANG DALO NUSA TENGGARA TIMUR 1 823 Phase 1 379 321 771 69.4 120.39274 -8.60409 10064 5310070008 WULIWUTIK NUSA TENGGARA TIMUR 108 Phase 1 28 23 772 5.1 122.16056 -8.62498 10065 8105010021 KALAR KALAR MALUKU 774 Phase 1 163 167 238 31.6 134.09427 -6.58718 10066 8101051001 ROMEAN MALUKU 1 664 Phase 1 315 323 190 61.1 131.93960 -7.05654 10067 8271030020 TUBO MALUKU UTARA 1 836 Phase 1 459 470 934 94.9 127.37716 0.82451 10068 8108070003 UPUHUPUN MALUKU 89 Phase 1 24 24 624 4.7 129.56042 -7.91897 10069 8172030008 DULLAH LAUT MALUKU 1 755 Phase 1 302 309 852 58.6 132.72856 -5.53818 10070 8171020016 BATU MERAH MALUKU 304 Phase 1 71 72 846 13.8 128.21514 -3.68383 10071 5314030007 OELUNGGU NUSA TENGGARA TIMUR 2 090 Phase 1 501 352 203 76.0 123.07386 -10.74135 10072 5317060009 WEE RAME NUSA TENGGARA TIMUR 3 049 Phase 1 467 328 301 70.8 119.28683 -9.54516 10073 5318030010 PAGOMOGO NUSA TENGGARA TIMUR 1 264 Phase 1 316 268 284 57.9 121.30120 -8.76196 10074 5307041005 WAISIKA NUSA TENGGARA TIMUR 279 Phase 1 77 65 373 14.1 124.77089 -8.18685 10075 8105010023 JEROL MALUKU 594 Phase 1 165 169 290 32.0 134.17751 -6.48328 10076 8101051004 SOFYANIN MALUKU 600 Phase 1 137 140 562 26.6 131.94877 -7.03145 10077 8272030009 TOPO MALUKU UTARA 1 454 Phase 1 394 404 244 81.4 127.42795 0.65168 10078 8108070003 UPUHUPUN MALUKU 105 Phase 1 28 28 728 5.4 129.55396 -7.93703 10079 8102020035 UWAT MALUKU 228 Phase 1 73 74 898 14.2 133.05205 -5.48266 10080 8171020016 BATU MERAH MALUKU 12 759 Phase 1 2 957 3 033 882 573.8 128.21971 -3.68389 10081 5314040009 NGGODIMEDA NUSA TENGGARA TIMUR 1 509 Phase 1 383 269 249 58.1 123.15772 -10.66991 10082 5317060005 TEMA TANA NUSA TENGGARA TIMUR 2 925 Phase 1 316 222 148 47.9 119.34945 -9.60366 10083 5311020004 NDETUNDORA I NUSA TENGGARA TIMUR 447 Phase 1 140 118 860 25.6 121.64837 -8.79450 10084 5307041004 NAILANG NUSA TENGGARA TIMUR 859 Phase 1 226 191 874 41.4 124.77451 -8.19011 Annex II – Demand forecast results Page 1 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 10085 8105010024 LOR LOR MALUKU 738 Phase 1 167 171 342 32.4 134.17336 -6.46768 10086 8101051004 SOFYANIN MALUKU 475 Phase 1 109 111 834 21.1 131.95178 -7.02364 10087 8205032003 METI MALUKU UTARA 1 586 Phase 1 413 423 738 85.4 128.04969 1.57174 10088 8108070001 POTA BESAR MALUKU 148 Phase 1 48 49 248 9.3 129.55345 -7.93817 10089 8102020035 UWAT MALUKU 277 Phase 1 89 91 314 17.3 133.05718 -5.46503 10090 8171020016 BATU MERAH MALUKU 9 312 Phase 1 2 159 2 215 134 418.9 128.20962 -3.68229 10091 5314030010 HOLOAMA NUSA TENGGARA TIMUR 1 287 Phase 1 330 231 990 50.1 123.02947 -10.78457 10092 5317020011 ONGGOL NUSA TENGGARA TIMUR 1 989 Phase 1 304 213 712 46.1 119.00639 -9.53804 10093 5311020005 RANDOTONDA NUSA TENGGARA TIMUR 876 Phase 1 257 218 193 47.1 121.65410 -8.78952 10094 5307061002 PETLENG NUSA TENGGARA TIMUR 988 Phase 1 195 165 555 35.7 124.58741 -8.21404 10095 8105030094 DURJELA MALUKU 522 Phase 1 111 113 886 21.5 134.21613 -5.81031 10096 8101051005 WALERANG MALUKU 756 Phase 1 149 152 874 28.9 131.96372 -7.01370 10097 8272050014 BALBAR MALUKU UTARA 916 Phase 1 186 190 836 38.4 127.56642 0.74104 10098 8108070002 POTA KECIL MALUKU 203 Phase 1 66 67 716 12.8 129.53300 -7.94659 10099 8102020035 UWAT MALUKU 27 Phase 1 9 9 234 1.7 133.05753 -5.45276 10100 8171010001 LATUHALAT MALUKU 4 406 Phase 1 1 098 1 126 548 213.0 128.10330 -3.78786 10101 5314040011 MAUBESI NUSA TENGGARA TIMUR 1 411 Phase 1 335 235 505 50.8 123.09635 -10.72270 10102 5317020009 KAWANGO HARI NUSA TENGGARA TIMUR 2 091 Phase 1 348 244 644 52.8 118.99919 -9.54163 10103 5319040009 NANGA MBALING NUSA TENGGARA TIMUR 738 Phase 1 176 149 424 32.2 120.76709 -8.36732 10104 5307060011 BAMPALOLA NUSA TENGGARA TIMUR 535 Phase 1 171 145 179 31.3 124.42960 -8.25313 10105 8105030075 LAU LAU MALUKU 239 Phase 1 64 65 664 12.4 134.32228 -5.93749 10106 8101051006 ADODO FORDATA MALUKU 703 Phase 1 179 183 654 34.7 131.97603 -7.00074 10107 8272050006 SOFIFI MALUKU UTARA 69 Phase 1 17 17 442 3.5 127.56531 0.74004 10108 8108070004 WASARILI MALUKU 276 Phase 1 73 74 898 14.2 129.52089 -7.91176 10109 8102020038 MUN OHOITADIUM MALUKU 492 Phase 1 104 106 704 20.2 133.05889 -5.45097 10110 8106020021 NEGERI KAWA MALUKU 2 660 Phase 1 533 546 858 103.4 128.11663 -2.95682 10111 5320020002 RAMEDUE NUSA TENGGARA TIMUR 1 180 Phase 1 297 208 791 45.1 121.74727 -10.60163 10112 5317060004 MAREDA KALADA NUSA TENGGARA TIMUR 2 775 Phase 1 419 294 557 63.6 119.32154 -9.59783 10113 5319040009 NANGA MBALING NUSA TENGGARA TIMUR 1 088 Phase 1 260 220 740 47.6 120.76520 -8.36789 10114 5307050017 WELAI TIMUR NUSA TENGGARA TIMUR 349 Phase 1 79 67 071 14.5 124.58438 -8.21845 10115 8105030073 NAPAR MALUKU 368 Phase 1 100 102 600 19.4 134.32235 -5.98255 10116 8101051006 ADODO FORDATA MALUKU 300 Phase 1 77 79 002 14.9 131.97667 -6.99943 10117 8272050006 SOFIFI MALUKU UTARA 1 525 Phase 1 371 380 646 76.7 127.55918 0.73666 10118 8108070005 RUMAH LEWANG BESAR MALUKU 298 Phase 1 75 76 950 14.6 129.52044 -7.90604 10119 8102020038 MUN OHOITADIUM MALUKU 438 Phase 1 92 94 392 17.9 133.06034 -5.44564 10120 8104020001 JAMILU MALUKU 1 522 Phase 1 415 425 790 80.5 127.02424 -3.27667 10121 5314010016 MBOKAK NUSA TENGGARA TIMUR 1 566 Phase 1 336 236 208 51.0 123.02341 -10.82685 10122 5317060003 PADA EWATA NUSA TENGGARA TIMUR 3 156 Phase 1 598 420 394 90.7 119.32918 -9.61391 10123 5311011006 RORURANGGA NUSA TENGGARA TIMUR 26 Phase 1 7 5 943 1.3 121.52603 -8.85157 10124 5308070013 UMALEU NUSA TENGGARA TIMUR 21 Phase 1 7 5 943 1.3 123.81018 -8.18623 10125 8105020033 NAMARA MALUKU 433 Phase 1 121 124 146 23.5 134.32887 -6.02482 10126 8101040015 WOWONDA MALUKU 1 748 Phase 1 176 180 576 34.2 131.31141 -7.86673 10127 8271010007 FORAMADIAHI MALUKU UTARA 972 Phase 1 250 256 500 51.7 127.31873 0.77204 10128 8108070007 RUMAH LEWANG KECIL MALUKU 178 Phase 1 43 44 118 8.3 129.52424 -7.87878 10129 8102020038 MUN OHOITADIUM MALUKU 471 Phase 1 99 101 574 19.2 133.06125 -5.43901 10130 8171020006 SOYA MALUKU 1 Phase 1 1 1 026 0.2 128.20000 -3.69650 10131 5314010017 OELASIN NUSA TENGGARA TIMUR 2 221 Phase 1 500 351 500 75.8 123.03485 -10.83538 10132 5317030007 KALENA RONGO NUSA TENGGARA TIMUR 6 684 Phase 1 1 122 788 766 170.2 118.97843 -9.50813 10133 5311011006 RORURANGGA NUSA TENGGARA TIMUR 697 Phase 1 181 153 669 33.2 121.52181 -8.85271 10134 5308070014 BURIWUTUNG NUSA TENGGARA TIMUR 759 Phase 1 181 153 669 33.2 123.80951 -8.18610 10135 8105020017 SELILAU MALUKU 354 Phase 1 88 90 288 17.1 134.31433 -6.02676 10136 8203020026 WAIBAU MALUKU UTARA 1 513 Phase 1 282 289 332 58.3 125.96880 -2.05405 10137 8108070006 HERLEY/ HOKA MALUKU 168 Phase 1 64 65 664 12.4 129.52813 -7.86758 10138 8101040014 ILNGEI MALUKU 1 173 Phase 1 214 219 564 41.5 131.29054 -7.86061 10139 8102020028 FAKO MALUKU 537 Phase 1 98 100 548 19.0 133.04289 -5.62574 10140 8171020006 SOYA MALUKU 897 Phase 1 183 187 758 35.5 128.20496 -3.69765 10141 5314030006 HELEBEIK NUSA TENGGARA TIMUR 1 510 Phase 1 348 244 644 52.8 123.08294 -10.78701 10142 5317060015 WEE PATANDO NUSA TENGGARA TIMUR 1 979 Phase 1 367 258 001 55.7 119.32444 -9.54306 10143 5311011006 RORURANGGA NUSA TENGGARA TIMUR 229 Phase 1 60 50 940 11.0 121.51880 -8.85778 10144 5308070014 BURIWUTUNG NUSA TENGGARA TIMUR 139 Phase 1 37 31 413 6.8 123.80033 -8.17870 10145 8105020017 SELILAU MALUKU 171 Phase 1 43 44 118 8.3 134.30631 -6.04933 10146 8271021009 MOYA MALUKU UTARA 1 459 Phase 1 477 489 402 98.6 127.36878 0.79749 10147 8108070008 NUSIATA MALUKU 14 Phase 1 4 4 104 0.8 129.52731 -7.86724 10148 8101040017 BOMAKI MALUKU 1 049 Phase 1 182 186 732 35.3 131.29035 -7.91227 10149 8102020029 REYAMRU MALUKU 457 Phase 1 78 80 028 15.1 133.06802 -5.59368 10150 8171020006 SOYA MALUKU 656 Phase 1 134 137 484 26.0 128.20776 -3.69980 10151 5314050007 KEOEN NUSA TENGGARA TIMUR 1 182 Phase 1 317 222 851 48.1 123.28632 -10.64243 10152 5317070006 MALI MADA NUSA TENGGARA TIMUR 1 920 Phase 1 318 223 554 48.2 119.38103 -9.51912 10153 5311011005 PUUTARA NUSA TENGGARA TIMUR 1 559 Phase 1 420 356 580 76.9 121.52139 -8.86560 10154 5308070014 BURIWUTUNG NUSA TENGGARA TIMUR 321 Phase 1 84 71 316 15.4 123.79748 -8.17682 10155 8202031003 TILOPPE MALUKU UTARA 435 Phase 1 113 115 938 23.4 127.91787 0.23485 10156 8108070008 NUSIATA MALUKU 214 Phase 1 54 55 404 10.5 129.52573 -7.86076 10157 8105020018 BENJINA MALUKU 1 800 Phase 1 421 431 946 81.7 134.28518 -6.05618 10158 8101042003 BATU PUTIH MALUKU 1 684 Phase 1 842 863 892 163.4 131.13199 -7.68520 10159 8102021001 KILWAIR MALUKU 1 586 Phase 2 310 318 060 60.2 133.08369 -5.56429 10160 8106010012 BUANO UTARA MALUKU 4 235 Phase 1 1 069 1 096 794 207.4 127.95246 -3.00892 10161 5314050009 OLAFULIHAA NUSA TENGGARA TIMUR 1 960 Phase 1 458 321 974 69.5 123.23455 -10.65206 10162 5317080006 WEE PANGALI NUSA TENGGARA TIMUR 1 082 Phase 1 237 166 611 35.9 119.26554 -9.40662 10163 5311011004 AEJETI NUSA TENGGARA TIMUR 103 Phase 1 34 28 866 6.2 121.52882 -8.86954 10164 5308070015 MAMPIR NUSA TENGGARA TIMUR 121 Phase 1 36 30 564 6.6 123.79651 -8.17853 10165 8202031008 AIR SALOBAR MALUKU UTARA 539 Phase 1 142 145 692 29.4 127.91759 0.24188 10166 8108070017 YALTUBUNG MALUKU 414 Phase 1 46 47 196 8.9 129.71371 -7.82325 10167 8105020034 GULILI MALUKU 246 Phase 1 37 37 962 7.2 134.33132 -6.03426 10168 8101054001 LORWEMBUN MALUKU 723 Phase 2 149 152 874 28.9 131.46175 -7.64675 10169 8102021002 HOLLAT MALUKU 1 721 Phase 2 286 293 436 55.5 133.10273 -5.51899 Annex II – Demand forecast results Page 2 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 10170 8103080023 ITAWAKA MALUKU 1 820 Phase 1 447 458 622 86.7 128.71703 -3.50978 10171 5305060006 TUALENE NUSA TENGGARA TIMUR 1 341 Phase 1 339 238 317 51.4 124.80984 -9.32073 10172 5301060013 MODU WAIMARINGU NUSA TENGGARA TIMUR 2 390 Phase 1 272 191 216 41.3 119.44048 -9.64763 10173 5311011004 AEJETI NUSA TENGGARA TIMUR 616 Phase 1 201 170 649 36.8 121.52914 -8.87744 10174 5308070015 MAMPIR NUSA TENGGARA TIMUR 740 Phase 1 215 182 535 39.4 123.79435 -8.17572 10175 8202031005 LOLEO MALUKU UTARA 731 Phase 1 154 158 004 31.8 127.91707 0.24482 10176 8105020041 TANAH MIRING MALUKU 341 Phase 1 66 67 716 12.8 134.33653 -6.03973 10177 8101054002 ALUSI BATJAS MALUKU 538 Phase 2 105 107 730 20.4 131.48639 -7.63577 10178 8108080019 LETWURUNG MALUKU 980 Phase 1 28 28 728 5.4 129.83386 -7.91211 10179 8102020038 MUN OHOITADIUM MALUKU 464 Phase 2 98 100 548 19.0 133.07498 -5.39787 10180 8103081001 TITAWAAI MALUKU 978 Phase 1 233 239 058 45.2 128.76360 -3.67896 10181 5314020007 OETUTULU NUSA TENGGARA TIMUR 1 649 Phase 1 363 255 189 55.1 122.99879 -10.76975 10182 5317020004 BONDO KODI NUSA TENGGARA TIMUR 249 Phase 1 41 28 823 6.2 118.98697 -9.59212 10183 5311011005 PUUTARA NUSA TENGGARA TIMUR 33 Phase 1 9 7 641 1.6 121.52240 -8.87522 10184 5308070015 MAMPIR NUSA TENGGARA TIMUR 435 Phase 1 126 106 974 23.1 123.79044 -8.17332 10185 8205050008 TOWEKA MALUKU UTARA 609 Phase 1 232 238 032 48.0 127.84168 1.83654 10186 8105020019 PAPAKULA MALUKU 935 Phase 1 220 225 720 42.7 134.34542 -6.03871 10187 8101054005 ALUSI KELAAN MALUKU 792 Phase 2 152 155 952 29.5 131.52051 -7.61683 10188 8108040003 PATTI MALUKU 633 Phase 1 141 144 666 27.4 127.84914 -8.20744 10189 8102020041 AD WEARAUR MALUKU 824 Phase 2 160 164 160 31.0 133.07621 -5.39480 10190 8107010025 SERA MALUKU 864 Phase 1 302 309 852 58.6 131.39416 -4.15754 10191 5303140023 MANUSAK NUSA TENGGARA TIMUR 3 000 Phase 1 628 441 484 95.3 123.91099 -10.09251 10192 5317020003 HAMONGGO LELE NUSA TENGGARA TIMUR 348 Phase 1 74 52 022 11.2 118.98351 -9.58135 10193 5311011003 PADERAPE NUSA TENGGARA TIMUR 274 Phase 1 74 62 826 13.6 121.52153 -8.87636 10194 5308070017 BARENG NUSA TENGGARA TIMUR 325 Phase 1 99 84 051 18.1 123.77435 -8.17306 10195 8205050011 SIMAU MALUKU UTARA 862 Phase 1 197 202 122 40.7 127.83535 1.84410 10196 8105020018 BENJINA MALUKU 983 Phase 1 230 235 980 44.6 134.27796 -6.06359 10197 8101054007 MEYANO RAYA MALUKU 1 232 Phase 2 237 243 162 46.0 131.55156 -7.60657 10198 8108040004 WERWARU MALUKU 532 Phase 1 110 112 860 21.3 127.88374 -8.17632 10199 8102020041 AD WEARAUR MALUKU 252 Phase 2 49 50 274 9.5 133.08393 -5.38041 10200 8104020004 NAMLEA MALUKU 259 Phase 1 49 50 274 9.5 127.03540 -3.26259 10201 5320040003 DEPE NUSA TENGGARA TIMUR 1 230 Phase 1 295 207 385 44.7 121.82970 -10.54001 10202 5317020005 PERO BATANG NUSA TENGGARA TIMUR 342 Phase 1 77 54 131 11.7 118.96648 -9.58597 10203 5311011003 PADERAPE NUSA TENGGARA TIMUR 636 Phase 1 172 146 028 31.5 121.51991 -8.87877 10204 5308070017 BARENG NUSA TENGGARA TIMUR 349 Phase 1 107 90 843 19.6 123.76951 -8.17372 10205 8204023004 MADAPOLO BARAT MALUKU UTARA 1 548 Phase 1 312 320 112 64.5 127.64693 -1.22277 10206 8105010021 KALAR KALAR MALUKU 266 Phase 1 56 57 456 10.9 134.09648 -6.55191 10207 8108040005 KLIS MALUKU 491 Phase 1 104 106 704 20.2 127.94288 -8.14833 10208 8101054006 ALUSI KRAWAIN MALUKU 811 Phase 2 168 172 368 32.6 131.59185 -7.65502 10209 8102020041 AD WEARAUR MALUKU 296 Phase 2 58 59 508 11.3 133.09340 -5.36718 10210 8104020004 NAMLEA MALUKU 186 Phase 1 36 36 936 7.0 127.06352 -3.26323 10211 5314050006 OELEDO NUSA TENGGARA TIMUR 1 421 Phase 1 360 253 080 54.6 123.30312 -10.68549 10212 5317020005 PERO BATANG NUSA TENGGARA TIMUR 318 Phase 1 72 50 616 10.9 118.96428 -9.58584 10213 5311011002 RENDORATERUA NUSA TENGGARA TIMUR 998 Phase 1 283 240 267 51.8 121.51689 -8.88028 10214 5308070018 KALIKUR NUSA TENGGARA TIMUR 1 153 Phase 1 291 247 059 53.3 123.76360 -8.17908 10215 8204023005 MADAPOLO MALUKU UTARA 2 332 Phase 1 500 513 000 103.4 127.64992 -1.22497 10216 8105020018 BENJINA MALUKU 346 Phase 1 81 83 106 15.7 134.26728 -6.06621 10217 8108040005 KLIS MALUKU 1 034 Phase 1 218 223 668 42.3 127.94366 -8.22012 10218 8101054004 ALUSI BUUK JALIN MALUKU 273 Phase 2 71 72 846 13.8 131.58292 -7.66411 10219 8102020041 AD WEARAUR MALUKU 667 Phase 2 129 132 354 25.0 133.09904 -5.35171 10220 8104020004 NAMLEA MALUKU 136 Phase 1 26 26 676 5.0 127.06701 -3.25587 10221 5314020010 INGGUINAK NUSA TENGGARA TIMUR 1 265 Phase 1 268 188 404 40.7 122.94657 -10.78263 10222 5317020006 WURA HOMBA NUSA TENGGARA TIMUR 1 450 Phase 1 309 217 227 46.9 118.95978 -9.58399 10223 5311011001 NDORIWOY NUSA TENGGARA TIMUR 998 Phase 1 283 240 267 51.8 121.51101 -8.88071 10224 5310052002 MEKENDETUN NUSA TENGGARA TIMUR 109 Phase 1 30 25 470 5.5 122.25700 -8.69261 10225 8204023006 MADAPOLO TIMUR MALUKU UTARA 1 278 Phase 1 320 328 320 66.1 127.65401 -1.22558 10226 8105020018 BENJINA MALUKU 349 Phase 2 82 84 132 15.9 134.26648 -6.07169 10227 8108040005 KLIS MALUKU 78 Phase 1 17 17 442 3.3 127.94147 -8.22203 10228 8101054003 ALUSI TAMRIAN MALUKU 443 Phase 2 89 91 314 17.3 131.58129 -7.66792 10229 8102021006 RENFAAN MALUKU 915 Phase 2 147 150 822 28.5 133.13045 -5.37969 10230 8104020004 NAMLEA MALUKU 134 Phase 1 26 26 676 5.0 127.06833 -3.25411 10231 5303170003 BENU NUSA TENGGARA TIMUR 1 061 Phase 1 217 152 551 32.9 124.07917 -9.95336 10232 5317020006 WURA HOMBA NUSA TENGGARA TIMUR 1 539 Phase 1 328 230 584 49.8 118.95912 -9.58120 10233 5311011007 REDORORI NUSA TENGGARA TIMUR 994 Phase 1 293 248 757 53.7 121.50940 -8.88399 10234 5310052002 MEKENDETUN NUSA TENGGARA TIMUR 127 Phase 1 34 28 866 6.2 122.25735 -8.70118 10235 8271030018 SANGAJI UTARA MALUKU UTARA 656 Phase 1 172 176 472 35.6 127.37452 0.81392 10236 8105010018 MARAFENFEN MALUKU 314 Phase 2 65 66 690 12.6 134.19753 -6.57547 10237 8108040005 KLIS MALUKU 42 Phase 1 9 9 234 1.7 127.98079 -8.24984 10238 8101054008 KILMASA MALUKU 605 Phase 2 136 139 536 26.4 131.62886 -7.60860 10239 8102021005 BANDA ELI MALUKU 2 000 Phase 2 385 395 010 74.7 133.13341 -5.41000 10240 8104020004 NAMLEA MALUKU 885 Phase 1 167 171 342 32.4 127.08848 -3.25592 10241 5305020051 BITEFA NUSA TENGGARA TIMUR 867 Phase 1 265 186 295 40.2 124.45822 -9.37012 10242 5317020008 HOMBA RANDE NUSA TENGGARA TIMUR 3 680 Phase 1 615 432 345 93.3 118.97058 -9.55741 10243 5311011004 AEJETI NUSA TENGGARA TIMUR 107 Phase 1 35 29 715 6.4 121.52887 -8.87908 10244 5310052002 MEKENDETUN NUSA TENGGARA TIMUR 364 Phase 1 98 83 202 18.0 122.26069 -8.70263 10245 8205042010 TOLONUO MALUKU UTARA 655 Phase 1 212 217 512 43.8 128.00878 1.77232 10246 8105020040 MARIRIMAR MALUKU 514 Phase 2 120 123 120 23.3 134.38458 -6.02911 10247 8108040005 KLIS MALUKU 504 Phase 1 107 109 782 20.8 127.98156 -8.25065 10248 8101054009 LUMASEBU MALUKU 192 Phase 2 44 45 144 8.5 131.62905 -7.60710 10249 8102010034 NGAYUB MALUKU 544 Phase 2 47 48 222 9.1 132.70550 -5.68872 10250 8104020004 NAMLEA MALUKU 31 Phase 1 6 6 156 1.2 127.08838 -3.25913 10251 5314060006 SERUBEBA NUSA TENGGARA TIMUR 1 664 Phase 1 385 270 655 58.4 123.35328 -10.61400 10252 5317020007 ATE DALO NUSA TENGGARA TIMUR 4 296 Phase 1 777 546 231 117.9 118.94523 -9.54194 10253 5311011004 AEJETI NUSA TENGGARA TIMUR 195 Phase 1 64 54 336 11.7 121.53132 -8.88116 10254 5310052002 MEKENDETUN NUSA TENGGARA TIMUR 176 Phase 1 47 39 903 8.6 122.26281 -8.70242 Annex II – Demand forecast results Page 3 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 10255 8205042009 TOLONUO SELATAN MALUKU UTARA 439 Phase 1 141 144 666 29.1 128.01260 1.76968 10256 8105020035 JIRLAY MALUKU 369 Phase 2 79 81 054 15.3 134.39396 -6.04231 10257 8108040006 TOUNWAWAN MALUKU 502 Phase 2 178 182 628 34.5 128.02522 -8.19272 10258 8101054009 LUMASEBU MALUKU 425 Phase 2 97 99 522 18.8 131.64576 -7.56238 10259 8102021007 LANGGIAR HAAR MALUKU 663 Phase 2 107 109 782 20.8 133.14212 -5.35049 10260 8104020004 NAMLEA MALUKU 29 Phase 1 6 6 156 1.2 127.08980 -3.26392 10261 5314070003 SEDEOEN NUSA TENGGARA TIMUR 987 Phase 1 227 159 581 34.4 122.85577 -10.87585 10262 5317020001 KAPAKA MADETA NUSA TENGGARA TIMUR 1 336 Phase 1 197 138 491 29.9 119.01331 -9.57334 10263 5313121002 BANGKA KENDA NUSA TENGGARA TIMUR 566 Phase 1 125 106 125 22.9 120.45792 -8.57701 10264 5310052003 BLATATATIN NUSA TENGGARA TIMUR 184 Phase 1 48 40 752 8.8 122.26511 -8.70234 10265 8205042009 TOLONUO SELATAN MALUKU UTARA 288 Phase 1 92 94 392 19.0 128.01468 1.76872 10266 8105030098 WOKAM MALUKU 728 Phase 2 127 130 302 24.6 134.26218 -5.71572 10267 8108040006 TOUNWAWAN MALUKU 143 Phase 2 51 52 326 9.9 128.02187 -8.16843 10268 8101053002 TUTUKEMBONG MALUKU 956 Phase 2 221 226 746 42.9 131.64855 -7.50475 10269 8102021008 HAAR OHOIMEL MALUKU 1 163 Phase 2 208 213 408 40.4 133.15568 -5.32835 10270 8104020004 NAMLEA MALUKU 62 Phase 1 12 12 312 2.3 127.09173 -3.26370 10271 5320040005 RAEMUDE NUSA TENGGARA TIMUR 1 678 Phase 1 361 253 783 54.8 121.85582 -10.56032 10272 5317010012 DINJO NUSA TENGGARA TIMUR 906 Phase 1 210 147 630 31.9 119.02062 -9.58836 10273 5313121002 BANGKA KENDA NUSA TENGGARA TIMUR 111 Phase 1 25 21 225 4.6 120.45414 -8.57371 10274 5310052003 BLATATATIN NUSA TENGGARA TIMUR 297 Phase 1 61 51 789 11.2 122.27064 -8.70072 10275 8206031003 TOBOINO MALUKU UTARA 916 Phase 1 236 242 136 48.8 128.21878 1.14553 10276 8105020014 GARDAKAU MALUKU 650 Phase 2 203 208 278 39.4 134.26818 -6.15015 10277 8101053004 ARMA MALUKU 1 939 Phase 2 387 397 062 75.1 131.69194 -7.42408 10278 8102022007 TAMANGIL NUHUYANAT MALUKU 130 Phase 2 52 53 352 10.1 132.89344 -5.83708 10279 8108040006 TOUNWAWAN MALUKU 1 597 Phase 2 565 579 690 109.6 128.01741 -8.16862 10280 8104020004 NAMLEA MALUKU 36 Phase 1 7 7 182 1.4 127.09692 -3.26476 10281 5305060009 BORONUBAEN NUSA TENGGARA TIMUR 750 Phase 1 171 120 213 25.9 124.83820 -9.27544 10282 5317010012 DINJO NUSA TENGGARA TIMUR 1 139 Phase 1 284 199 652 43.1 119.02297 -9.58916 10283 5313121002 BANGKA KENDA NUSA TENGGARA TIMUR 1 113 Phase 1 245 208 005 44.9 120.45644 -8.57073 10284 5310052003 BLATATATIN NUSA TENGGARA TIMUR 145 Phase 1 38 32 262 7.0 122.27221 -8.69763 10285 8203010005 KABAU DARAT MALUKU UTARA 314 Phase 1 64 65 664 13.2 125.88403 -2.18596 10286 8105030099 SAMANG MALUKU 627 Phase 2 167 171 342 32.4 134.24957 -5.66428 10287 8101053005 WATMURI MALUKU 1 943 Phase 2 316 324 216 61.3 131.70013 -7.42206 10288 8102022003 FEER MALUKU 327 Phase 2 92 94 392 17.9 132.89312 -5.85945 10289 8108080012 EMPALWAS MALUKU 348 Phase 2 83 85 158 16.1 129.77615 -8.04701 10290 8104020004 NAMLEA MALUKU 87 Phase 1 17 17 442 3.3 127.09810 -3.26918 10291 5305060010 LOKOMEA NUSA TENGGARA TIMUR 911 Phase 1 216 151 848 32.8 124.83901 -9.26515 10292 5317010011 LETE LOKO NUSA TENGGARA TIMUR 3 412 Phase 1 639 449 217 96.9 119.01884 -9.60483 10293 5311011004 AEJETI NUSA TENGGARA TIMUR 398 Phase 1 130 110 370 23.8 121.53252 -8.88792 10294 5310052003 BLATATATIN NUSA TENGGARA TIMUR 120 Phase 1 31 26 319 5.7 122.27711 -8.69337 10295 8203010008 KABAU PANTAI MALUKU UTARA 1 023 Phase 1 184 188 784 38.0 125.88098 -2.19311 10296 8105030100 UJIR MALUKU 1 000 Phase 2 170 174 420 33.0 134.29051 -5.57491 10297 8101040010 OLILIT MALUKU 75 Phase 2 24 24 624 4.7 131.28970 -7.99732 10298 8102022003 FEER MALUKU 63 Phase 2 18 18 468 3.5 132.88620 -5.88659 10299 8108080007 LATALOLA BESAR MALUKU 169 Phase 2 56 57 456 10.9 129.85452 -8.13872 10300 8104020004 NAMLEA MALUKU 6 717 Phase 1 1 266 1 298 916 245.6 127.10072 -3.27183 10301 5314041003 TEBOLE NUSA TENGGARA TIMUR 1 274 Phase 1 273 191 919 41.4 123.22547 -10.77727 10302 5317010007 UMBU NGEDO NUSA TENGGARA TIMUR 2 587 Phase 1 424 298 072 64.3 119.02000 -9.62279 10303 5313120009 PONG LEKO NUSA TENGGARA TIMUR 723 Phase 1 187 158 763 34.3 120.35875 -8.59845 10304 5310050006 IAN TENA NUSA TENGGARA TIMUR 409 Phase 1 103 87 447 18.9 122.28125 -8.68734 10305 8205030015 TALAGA PACA MALUKU UTARA 486 Phase 1 157 161 082 32.5 127.94622 1.56772 10306 8105031019 KOLAHA MALUKU 410 Phase 2 101 103 626 19.6 134.48731 -5.49545 10307 8101040001 LERMATANG MALUKU 1 065 Phase 2 172 176 472 33.4 131.22375 -7.95660 10308 8102022011 TAMANGIL NUHUTEN MALUKU 224 Phase 2 49 50 274 9.5 132.88939 -5.89147 10309 8108080007 LATALOLA BESAR MALUKU 178 Phase 2 58 59 508 11.3 129.84568 -8.14597 10310 8104020004 NAMLEA MALUKU 110 Phase 1 21 21 546 4.1 127.10117 -3.27924 10311 5314010008 OETEFFU NUSA TENGGARA TIMUR 1 365 Phase 1 339 238 317 51.4 122.96940 -10.88774 10312 5317010006 WAINYAPU NUSA TENGGARA TIMUR 2 665 Phase 1 533 374 699 80.8 119.02304 -9.64569 10313 5311062001 WOLOMUKU NUSA TENGGARA TIMUR 688 Phase 1 151 128 199 27.7 121.73879 -8.60410 10314 5310050006 IAN TENA NUSA TENGGARA TIMUR 249 Phase 1 63 53 487 11.5 122.28565 -8.68597 10315 8272041002 MAIDI MALUKU UTARA 225 Phase 1 75 76 950 15.5 127.70129 0.13342 10316 8105031020 WAHAYUM MALUKU 297 Phase 2 62 63 612 12.0 134.51335 -5.45338 10317 8108080008 MARSELA MALUKU 148 Phase 2 33 33 858 6.4 129.86574 -8.15258 10318 8101040002 LATDALAM MALUKU 3 011 Phase 2 617 633 042 119.7 131.11069 -7.95220 10319 8102022006 SUNGAI MALUKU 200 Phase 2 61 62 586 11.8 132.88997 -5.89548 10320 8104020004 NAMLEA MALUKU 7 376 Phase 1 1 390 1 426 140 269.7 127.09769 -3.27977 10321 5320040014 RAEMADIA NUSA TENGGARA TIMUR 1 815 Phase 1 390 274 170 59.2 121.84949 -10.46929 10322 5301060011 SOBA RADE NUSA TENGGARA TIMUR 1 132 Phase 1 311 218 633 47.2 119.44956 -9.61195 10323 5313120018 BEO RAHONG NUSA TENGGARA TIMUR 133 Phase 1 34 28 866 6.2 120.38961 -8.56443 10324 5310050007 KOPONG NUSA TENGGARA TIMUR 220 Phase 1 55 46 695 10.1 122.29550 -8.68873 10325 8272041002 MAIDI MALUKU UTARA 709 Phase 1 237 243 162 49.0 127.70180 0.12230 10326 8105031023 WAHANGULANGULA MALUKU 128 Phase 2 42 43 092 8.1 134.55519 -5.44679 10327 8108080005 ILBUTUNG MALUKU 144 Phase 2 28 28 728 5.4 129.85276 -8.16806 10328 8101043005 NAMTABUNG MALUKU 1 845 Phase 3 330 338 580 64.0 130.93756 -8.13887 10329 8102022005 NGAFAN MALUKU 306 Phase 2 94 96 444 18.2 132.88903 -5.89826 10330 8104020004 NAMLEA MALUKU 999 Phase 1 189 193 914 36.7 127.09005 -3.26699 10331 5304090007 TESI AYOFANU NUSA TENGGARA TIMUR 159 Phase 1 44 30 932 6.7 124.60009 -9.87241 10332 5317050005 WALI ATE NUSA TENGGARA TIMUR 436 Phase 1 80 56 240 12.1 119.17481 -9.51536 10333 5313120018 BEO RAHONG NUSA TENGGARA TIMUR 397 Phase 1 101 85 749 18.5 120.38857 -8.56302 10334 5310051010 HEOPUAT NUSA TENGGARA TIMUR 862 Phase 1 247 209 703 45.2 122.30333 -8.68728 10335 8207050002 YAO MALUKU UTARA 849 Phase 1 216 221 616 44.7 128.64093 2.33004 10336 8105031024 KAIBOLAFIN MALUKU 215 Phase 2 45 46 170 8.7 134.58635 -5.43157 10337 8108080006 NURA MALUKU 197 Phase 2 113 115 938 21.9 129.83382 -8.17373 10338 8101053003 MANGLUSI MALUKU 958 Phase 3 208 213 408 40.4 131.60583 -7.48065 10339 8102013002 DANAR TERNATE MALUKU 1 184 Phase 2 46 47 196 8.9 132.75930 -5.93026 Annex II – Demand forecast results Page 4 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 10340 8107020047 ANGAR MALUKU 426 Phase 1 302 309 852 58.6 130.80461 -3.68341 10341 5304090007 TESI AYOFANU NUSA TENGGARA TIMUR 61 Phase 1 17 11 951 2.6 124.59753 -9.87532 10342 5317050005 WALI ATE NUSA TENGGARA TIMUR 295 Phase 1 55 38 665 8.3 119.16420 -9.51660 10343 5313123003 TENGKU LESE NUSA TENGGARA TIMUR 101 Phase 1 23 19 527 4.2 120.38188 -8.55623 10344 5310050008 SEUSINA NUSA TENGGARA TIMUR 1 020 Phase 1 224 190 176 41.0 122.30160 -8.68237 10345 8272020002 AFA AFA MALUKU UTARA 428 Phase 1 106 108 756 21.9 127.37567 0.67346 10346 8105031018 FOKET MALUKU 425 Phase 2 94 96 444 18.2 134.60286 -5.44735 10347 8108080003 LAWAWANG MALUKU 206 Phase 2 63 64 638 12.2 129.83333 -8.17528 10348 8101053001 WATURU MALUKU 1 274 Phase 3 242 248 292 47.0 131.57480 -7.53441 10349 8102021004 WATLAR MALUKU 551 Phase 2 104 106 704 20.2 133.11852 -5.43985 10350 8107020045 ARTAFELA MALUKU 461 Phase 1 302 309 852 58.6 130.80003 -3.69287 10351 5304090007 TESI AYOFANU NUSA TENGGARA TIMUR 159 Phase 1 44 30 932 6.7 124.59700 -9.87604 10352 5317050005 WALI ATE NUSA TENGGARA TIMUR 36 Phase 1 7 4 921 1.1 119.15648 -9.52463 10353 5313123003 TENGKU LESE NUSA TENGGARA TIMUR 297 Phase 1 67 56 883 12.3 120.37830 -8.55720 10354 5310051009 HEWOKLOANG NUSA TENGGARA TIMUR 943 Phase 1 292 247 908 53.5 122.30106 -8.69584 10355 8272020010 SIRONGO FOLARAHA MALUKU UTARA 201 Phase 1 50 51 300 10.3 127.38130 0.68145 10356 8105031025 TASINWAHA MALUKU 311 Phase 2 70 71 820 13.6 134.60840 -5.44598 10357 8108080001 BABYOTANG MALUKU 202 Phase 2 53 54 378 10.3 129.83749 -8.18900 10358 8101050028 LAMDESAR BARAT MALUKU 634 Phase 3 53 54 378 10.3 131.92929 -7.21001 10359 8102021003 OHOIFAU MALUKU 761 Phase 2 137 140 562 26.6 133.11652 -5.46958 10360 8104020004 NAMLEA MALUKU 39 Phase 1 8 8 208 1.6 127.08669 -3.26854 10361 5304090007 TESI AYOFANU NUSA TENGGARA TIMUR 137 Phase 1 38 26 714 5.8 124.59080 -9.87477 10362 5317050003 WEE KOMBAKA NUSA TENGGARA TIMUR 915 Phase 1 192 134 976 29.1 119.15581 -9.52476 10363 5313123001 PONG LENGOR NUSA TENGGARA TIMUR 47 Phase 1 13 11 037 2.4 120.37283 -8.55334 10364 5310050006 IAN TENA NUSA TENGGARA TIMUR 174 Phase 1 44 37 356 8.1 122.28617 -8.68358 10365 8272020010 SIRONGO FOLARAHA MALUKU UTARA 355 Phase 1 89 91 314 18.4 127.38265 0.68464 10366 8105031026 KABUFIN MALUKU 199 Phase 2 31 31 806 6.0 134.63750 -5.45513 10367 8108080011 BULULORA MALUKU 103 Phase 2 35 35 910 6.8 129.87677 -8.14799 10368 8101042004 WERMATANG MALUKU 745 Phase 3 172 176 472 33.4 131.18488 -7.72395 10369 8102022002 LANGGIAR FEER MALUKU 490 Phase 3 136 139 536 26.4 132.87405 -5.91745 10370 8104020004 NAMLEA MALUKU 550 Phase 1 104 106 704 20.2 127.08596 -3.26705 10371 5304090007 TESI AYOFANU NUSA TENGGARA TIMUR 164 Phase 1 45 31 635 6.8 124.59047 -9.87526 10372 5317050003 WEE KOMBAKA NUSA TENGGARA TIMUR 905 Phase 1 199 139 897 30.2 119.14046 -9.51930 10373 5313123001 PONG LENGOR NUSA TENGGARA TIMUR 530 Phase 1 136 115 464 24.9 120.37528 -8.55106 10374 5307051001 LAWAHING NUSA TENGGARA TIMUR 502 Phase 1 144 122 256 26.4 124.54284 -8.15593 10375 8272020009 GUBU KUSUMA MALUKU UTARA 495 Phase 1 124 127 224 25.6 127.38767 0.68816 10376 8105031017 MARLASI MALUKU 1 403 Phase 2 336 344 736 65.2 134.65019 -5.47633 10377 8108080009 SERILI MALUKU 82 Phase 2 22 22 572 4.3 129.88103 -8.12559 10378 8101042005 MAKATIAN MALUKU 1 672 Phase 3 315 323 190 61.1 131.20041 -7.56979 10379 8102022008 SATHER MALUKU 858 Phase 3 149 152 874 28.9 132.93244 -5.86604 10380 8104020004 NAMLEA MALUKU 367 Phase 1 70 71 820 13.6 127.09655 -3.26103 10381 5304090007 TESI AYOFANU NUSA TENGGARA TIMUR 124 Phase 1 34 23 902 5.2 124.58855 -9.87412 10382 5317050003 WEE KOMBAKA NUSA TENGGARA TIMUR 739 Phase 1 162 113 886 24.6 119.14268 -9.50991 10383 5313123001 PONG LENGOR NUSA TENGGARA TIMUR 662 Phase 1 170 144 330 31.1 120.37367 -8.54894 10384 5310030002 WOLONWALU NUSA TENGGARA TIMUR 472 Phase 1 132 112 068 24.2 122.26745 -8.72440 10385 8272020010 SIRONGO FOLARAHA MALUKU UTARA 128 Phase 1 32 32 832 6.6 127.38061 0.68503 10386 8105031016 KOLAMAR MALUKU 554 Phase 2 165 169 290 32.0 134.65680 -5.49559 10387 8108080009 SERILI MALUKU 193 Phase 2 51 52 326 9.9 129.87754 -8.12420 10388 8101041002 LORULUN MALUKU 1 549 Phase 3 43 44 118 8.3 131.37903 -7.85104 10389 8102022009 TUTREAN MALUKU 189 Phase 3 53 54 378 10.3 132.95354 -5.84343 10390 8104020004 NAMLEA MALUKU 402 Phase 1 76 77 976 14.7 127.09641 -3.25944 10391 5304090009 NEKMESE NUSA TENGGARA TIMUR 661 Phase 1 157 110 371 23.8 124.58392 -9.88157 10392 5317050003 WEE KOMBAKA NUSA TENGGARA TIMUR 577 Phase 1 127 89 281 19.3 119.14170 -9.50971 10393 5313123001 PONG LENGOR NUSA TENGGARA TIMUR 267 Phase 1 69 58 581 12.6 120.36372 -8.54582 10394 5310030002 WOLONWALU NUSA TENGGARA TIMUR 87 Phase 1 25 21 225 4.6 122.26697 -8.72890 10395 8203011004 WAINIB MALUKU UTARA 622 Phase 1 121 124 146 25.0 125.95944 -2.32551 10396 8105031001 WARIALAU MALUKU 715 Phase 2 143 146 718 27.7 134.56165 -5.37137 10397 8102022009 TUTREAN MALUKU 173 Phase 3 48 49 248 9.3 132.95732 -5.85389 10398 8101050022 LELINGLUAN MALUKU 1 892 Phase 3 344 352 944 66.7 131.63377 -7.22531 10399 8103111002 WAKASIHU MALUKU 949 Phase 1 213 218 538 41.3 127.94003 -3.76773 10400 5304090007 TESI AYOFANU NUSA TENGGARA TIMUR 73 Phase 1 20 14 060 3.0 124.58949 -9.88572 10401 5317050004 MENNE ATE NUSA TENGGARA TIMUR 3 697 Phase 1 765 537 795 116.0 119.13940 -9.50121 10402 5313123001 PONG LENGOR NUSA TENGGARA TIMUR 200 Phase 1 52 44 148 9.5 120.35889 -8.54185 10403 5310030002 WOLONWALU NUSA TENGGARA TIMUR 316 Phase 1 89 75 561 16.3 122.26073 -8.72853 10404 8272050005 OBA MALUKU UTARA 1 018 Phase 1 168 172 368 34.7 127.55085 0.71606 10405 8105031013 MOHONGSEL MALUKU 183 Phase 2 56 57 456 10.9 134.67483 -5.54405 10406 8108020010 JERUSU MALUKU 76 Phase 2 19 19 494 3.7 127.40889 -7.59773 10407 8102013012 RUMAT MALUKU 711 Phase 3 33 33 858 6.4 132.79816 -5.81112 10408 8101052007 WATMASA MALUKU 889 Phase 3 182 186 732 35.3 131.57257 -7.13707 10409 8171010006 KEL BENTENG MALUKU 1 149 Phase 1 256 262 656 49.7 128.16751 -3.71439 10410 5304090007 TESI AYOFANU NUSA TENGGARA TIMUR 71 Phase 1 20 14 060 3.0 124.59142 -9.88632 10411 5317050003 WEE KOMBAKA NUSA TENGGARA TIMUR 1 021 Phase 1 224 157 472 34.0 119.13228 -9.50917 10412 5313123002 DIMPONG NUSA TENGGARA TIMUR 273 Phase 1 66 56 034 12.1 120.36324 -8.53728 10413 5310030001 HOKOR NUSA TENGGARA TIMUR 277 Phase 1 75 63 675 13.7 122.24807 -8.73618 10414 8203040003 LEKO KADAI MALUKU UTARA 1 519 Phase 1 391 401 166 80.8 125.40947 -1.78474 10415 8108020010 JERUSU MALUKU 325 Phase 2 79 81 054 15.3 127.41565 -7.59971 10416 8105031014 SELMONA MALUKU 326 Phase 2 118 121 068 22.9 134.70130 -5.53380 10417 8102010032 DEBUT MALUKU 1 571 Phase 3 95 97 470 18.4 132.63141 -5.71535 10418 8101052006 AWEAR RUMNGEUR MALUKU 438 Phase 3 108 110 808 21.0 131.51615 -7.23511 10419 8109020008 LEKSULA MALUKU 3 331 Phase 1 667 684 342 129.4 126.51293 -3.77758 10420 5304090009 NEKMESE NUSA TENGGARA TIMUR 160 Phase 1 38 26 714 5.8 124.58740 -9.89723 10421 5301021013 RINGU RARA NUSA TENGGARA TIMUR 1 493 Phase 1 288 202 464 43.7 119.38510 -9.73595 10422 5313123002 DIMPONG NUSA TENGGARA TIMUR 929 Phase 1 223 189 327 40.9 120.36528 -8.53779 10423 5310030001 HOKOR NUSA TENGGARA TIMUR 759 Phase 1 204 173 196 37.4 122.24397 -8.73460 10424 8271010014 SULAMADAHA MALUKU UTARA 1 326 Phase 1 383 392 958 79.2 127.33666 0.85974 Annex II – Demand forecast results Page 5 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 10425 8108020010 JERUSU MALUKU 198 Phase 2 48 49 248 9.3 127.42577 -7.59908 10426 8105031015 MASIDANG MALUKU 305 Phase 2 86 88 236 16.7 134.70479 -5.51688 10427 8102022003 FEER MALUKU 200 Phase 3 57 58 482 11.1 132.87379 -5.92122 10428 8101052005 KARATAT MALUKU 603 Phase 3 95 97 470 18.4 131.50441 -7.29468 10429 8103060013 LESLURU MALUKU 515 Phase 1 144 147 744 27.9 129.04005 -3.21729 10430 5304090009 NEKMESE NUSA TENGGARA TIMUR 564 Phase 1 134 94 202 20.3 124.58595 -9.89888 10431 5301021012 RAJAKA NUSA TENGGARA TIMUR 1 851 Phase 1 329 231 287 49.9 119.39065 -9.72342 10432 5315040010 LAWI NUSA TENGGARA TIMUR 242 Phase 1 50 42 450 9.2 120.35275 -8.53877 10433 5307060011 BAMPALOLA NUSA TENGGARA TIMUR 179 Phase 1 57 48 393 10.4 124.42453 -8.25497 10434 8201140009 JANO MALUKU UTARA 420 Phase 1 110 112 860 22.7 127.60813 1.70528 10435 8105031012 LEITING MALUKU 539 Phase 2 157 161 082 30.5 134.65971 -5.56930 10436 8102022004 KILWAT MALUKU 434 Phase 3 111 113 886 21.5 132.90978 -5.91242 10437 8108020010 JERUSU MALUKU 555 Phase 2 134 137 484 26.0 127.45082 -7.59449 10438 8101052004 WUNLAH MALUKU 233 Phase 3 38 38 988 7.4 131.44688 -7.33347 10439 8103060012 JERILI MALUKU 974 Phase 1 271 278 046 52.6 129.04665 -3.20935 10440 5304090009 NEKMESE NUSA TENGGARA TIMUR 208 Phase 1 50 35 150 7.6 124.58497 -9.90117 10441 5302010014 KAMBATA WUNDUT NUSA TENGGARA TIMUR 663 Phase 1 119 83 657 18.1 119.86178 -9.69494 10442 5315040010 LAWI NUSA TENGGARA TIMUR 653 Phase 1 135 114 615 24.7 120.35104 -8.54554 10443 5307060014 HULNANI NUSA TENGGARA TIMUR 408 Phase 1 122 103 578 22.3 124.42103 -8.24745 10444 8206020003 BINAGARA MALUKU UTARA 420 Phase 1 113 115 938 23.4 127.83538 0.76114 10445 8105031011 GOMSEY MALUKU 323 Phase 2 85 87 210 16.5 134.64415 -5.57162 10446 8172030003 LABETAWI MALUKU 694 Phase 3 31 31 806 6.0 132.78331 -5.55816 10447 8108020010 JERUSU MALUKU 27 Phase 2 7 7 182 1.4 127.40692 -7.60228 10448 8101052001 KILON MALUKU 635 Phase 3 155 159 030 30.1 131.43037 -7.34418 10449 8171020018 HATIVE KECIL MALUKU 17 Phase 1 4 4 104 0.8 128.20897 -3.67860 10450 5304090008 BELLE NUSA TENGGARA TIMUR 329 Phase 1 73 51 319 11.1 124.58398 -9.91148 10451 5302010014 KAMBATA WUNDUT NUSA TENGGARA TIMUR 1 125 Phase 1 201 141 303 30.5 119.85650 -9.69643 10452 5315040010 LAWI NUSA TENGGARA TIMUR 1 330 Phase 1 274 232 626 50.2 120.35364 -8.55199 10453 5308070018 KALIKUR NUSA TENGGARA TIMUR 592 Phase 1 150 127 350 27.5 123.76125 -8.18100 10454 8204031005 BAHU MALUKU UTARA 795 Phase 1 177 181 602 36.6 127.30163 -0.79824 10455 8105011005 BELTUBUR MALUKU 548 Phase 3 116 119 016 22.5 134.37584 -6.76665 10456 8172030007 DULLAH DARAT MALUKU 1 031 Phase 3 42 43 092 8.1 132.77821 -5.57077 10457 8108020010 JERUSU MALUKU 58 Phase 2 14 14 364 2.7 127.40581 -7.60405 10458 8101052002 ABAT MALUKU 857 Phase 3 203 208 278 39.4 131.41340 -7.34102 10459 8171020016 BATU MERAH MALUKU 487 Phase 1 113 115 938 21.9 128.20623 -3.67654 10460 5304090008 BELLE NUSA TENGGARA TIMUR 2 419 Phase 1 537 377 511 81.5 124.57952 -9.91112 10461 5317050013 WATU KAWULA NUSA TENGGARA TIMUR 371 Phase 1 70 49 210 10.6 119.15066 -9.42498 10462 5313123002 DIMPONG NUSA TENGGARA TIMUR 316 Phase 1 76 64 524 13.9 120.36039 -8.53415 10463 5310070003 BLORO NUSA TENGGARA TIMUR 1 507 Phase 1 110 93 390 20.2 122.15530 -8.67633 10464 8204031004 JIKO MALUKU UTARA 1 465 Phase 1 325 333 450 67.2 127.27732 -0.77882 10465 8105011007 KAREY MALUKU 387 Phase 3 81 83 106 15.7 134.39529 -6.75185 10466 8102020019 RAHARENG MALUKU 898 Phase 3 21 21 546 4.1 132.97492 -5.66820 10467 8108020010 JERUSU MALUKU 58 Phase 2 14 14 364 2.7 127.45590 -7.59230 10468 8101052004 WUNLAH MALUKU 851 Phase 3 136 139 536 26.4 131.43743 -7.31395 10469 8171020018 HATIVE KECIL MALUKU 325 Phase 1 65 66 690 12.6 128.20647 -3.67484 10470 5304090008 BELLE NUSA TENGGARA TIMUR 243 Phase 1 54 37 962 8.2 124.59558 -9.91102 10471 5317050013 WATU KAWULA NUSA TENGGARA TIMUR 528 Phase 1 99 69 597 15.0 119.15215 -9.41921 10472 5313123003 TENGKU LESE NUSA TENGGARA TIMUR 108 Phase 1 25 21 225 4.6 120.39153 -8.55545 10473 5309070015 LAMATEWELU NUSA TENGGARA TIMUR 63 Phase 1 20 16 980 3.7 123.22362 -8.36631 10474 8204031003 GALALA MALUKU UTARA 229 Phase 1 55 56 430 11.4 127.25045 -0.76715 10475 8105011007 KAREY MALUKU 213 Phase 3 45 46 170 8.7 134.40034 -6.75161 10476 8102020018 LER OHOILIM MALUKU 633 Phase 3 69 70 794 13.4 132.95564 -5.66994 10477 8108020010 JERUSU MALUKU 176 Phase 2 43 44 118 8.3 127.47135 -7.58407 10478 8101055001 NURKAT MALUKU 679 Phase 3 162 166 212 31.4 131.46386 -6.90663 10479 8103050012 MAKARIKI MALUKU 605 Phase 1 129 132 354 25.0 129.03740 -3.25886 10480 5304090006 FATU ULAN NUSA TENGGARA TIMUR 1 122 Phase 1 302 212 306 45.8 124.60520 -9.91174 10481 5317050013 WATU KAWULA NUSA TENGGARA TIMUR 1 001 Phase 1 188 132 164 28.5 119.15061 -9.41705 10482 5313123003 TENGKU LESE NUSA TENGGARA TIMUR 315 Phase 1 71 60 279 13.0 120.39163 -8.55285 10483 5309070015 LAMATEWELU NUSA TENGGARA TIMUR 272 Phase 1 84 71 316 15.4 123.22427 -8.36073 10484 8204031003 GALALA MALUKU UTARA 1 750 Phase 1 415 425 790 85.8 127.24814 -0.76601 10485 8105020042 SELIBATABATA MALUKU 718 Phase 3 174 178 524 33.8 134.39178 -6.01899 10486 8102022002 LANGGIAR FEER MALUKU 525 Phase 3 145 148 770 28.1 132.85995 -5.96002 10487 8108080004 TELALORA/LETODA MALUKU 196 Phase 2 39 40 014 7.6 129.83663 -8.20068 10488 8101055002 TUTUNAMETAL MALUKU 406 Phase 3 109 111 834 21.1 131.52240 -6.79498 10489 8103050023 SEPA MALUKU 5 752 Phase 1 1 086 1 114 236 210.7 129.05701 -3.25916 10490 5304090006 FATU ULAN NUSA TENGGARA TIMUR 662 Phase 1 179 125 837 27.2 124.60555 -9.90674 10491 5317010010 WAI KADADA NUSA TENGGARA TIMUR 1 547 Phase 1 329 231 287 49.9 119.03766 -9.60835 10492 5313123003 TENGKU LESE NUSA TENGGARA TIMUR 125 Phase 1 28 23 772 5.1 120.39199 -8.55097 10493 5309070015 LAMATEWELU NUSA TENGGARA TIMUR 79 Phase 1 25 21 225 4.6 123.22388 -8.35876 10494 8203040004 LEKOSULA MALUKU UTARA 796 Phase 1 182 186 732 37.6 125.45315 -1.79520 10495 8105020015 MAEKOR MALUKU 458 Phase 3 100 102 600 19.4 134.17091 -6.17007 10496 8102021009 OHOIRAUT MALUKU 266 Phase 3 84 86 184 16.3 133.16700 -5.29211 10497 8108080022 NAKARHAMTO MALUKU 384 Phase 2 73 74 898 14.2 129.76814 -7.84627 10498 8101055003 WULMASA MALUKU 505 Phase 3 128 131 328 24.8 131.52442 -6.74568 10499 8171020018 HATIVE KECIL MALUKU 336 Phase 1 68 69 768 13.2 128.21152 -3.67615 10500 5306010013 SIKUN NUSA TENGGARA TIMUR 321 Phase 1 95 66 785 14.4 124.93349 -9.62013 10501 5317010008 WALLA NDIMU NUSA TENGGARA TIMUR 2 228 Phase 1 440 309 320 66.7 119.05188 -9.61175 10502 5313123003 TENGKU LESE NUSA TENGGARA TIMUR 125 Phase 1 28 23 772 5.1 120.39138 -8.54978 10503 5309070015 LAMATEWELU NUSA TENGGARA TIMUR 101 Phase 1 31 26 319 5.7 123.22329 -8.35633 10504 8203041001 FALABISAHAYA MALUKU UTARA 6 880 Phase 1 1 652 1 694 952 341.5 125.47867 -1.79214 10505 8105010028 TABARFANE MALUKU 469 Phase 3 141 144 666 27.4 134.13252 -6.16942 10506 8108030002 TOMRA MALUKU 78 Phase 2 17 17 442 3.3 127.65375 -8.18536 10507 8101055005 ADODOMOLO MALUKU 660 Phase 3 162 166 212 31.4 131.56268 -6.70632 10508 8172020001 TAYANDO LANGGIAR MALUKU 691 Phase 3 160 164 160 31.0 132.35483 -5.55390 10509 8171020016 BATU MERAH MALUKU 119 Phase 1 28 28 728 5.4 128.22613 -3.68387 Annex II – Demand forecast results Page 6 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 10510 5306010013 SIKUN NUSA TENGGARA TIMUR 161 Phase 1 48 33 744 7.3 124.93537 -9.62427 10511 5317010010 WAI KADADA NUSA TENGGARA TIMUR 2 277 Phase 1 517 363 451 78.4 119.05168 -9.60140 10512 5313123003 TENGKU LESE NUSA TENGGARA TIMUR 200 Phase 1 45 38 205 8.2 120.39274 -8.54780 10513 5309070015 LAMATEWELU NUSA TENGGARA TIMUR 48 Phase 1 15 12 735 2.7 123.22359 -8.35322 10514 8203060018 LIMBO MALUKU UTARA 1 669 Phase 1 364 373 464 75.2 124.31562 -1.79049 10515 8105010028 TABARFANE MALUKU 200 Phase 3 60 61 560 11.6 134.11192 -6.16888 10516 8108040002 KAIWATU MALUKU 789 Phase 3 164 168 264 31.8 127.80800 -8.10966 10517 8101055004 WADANKAU MALUKU 656 Phase 3 160 164 160 31.0 131.60880 -6.70882 10518 8172020005 TAM NGURHIR MALUKU 1 201 Phase 3 214 219 564 41.5 132.33500 -5.56896 10519 8171020016 BATU MERAH MALUKU 807 Phase 1 188 192 888 36.5 128.22611 -3.68727 10520 5306010013 SIKUN NUSA TENGGARA TIMUR 45 Phase 1 14 9 842 2.1 124.93722 -9.62617 10521 5313123003 TENGKU LESE NUSA TENGGARA TIMUR 235 Phase 1 53 44 997 9.7 120.39463 -8.54605 10522 5309070015 LAMATEWELU NUSA TENGGARA TIMUR 172 Phase 1 53 44 997 9.7 123.22612 -8.35390 10523 8205011001 PASIR PUTIH MALUKU UTARA 324 Phase 1 88 90 288 18.2 127.68342 0.87684 10524 5317060019 MATA PYAWU NUSA TENGGARA TIMUR 2 946 Phase 1 384 269 952 58.2 119.36717 -9.58193 10525 8105031005 KABALSIANG MALUKU 754 Phase 3 152 155 952 29.5 134.79425 -5.73536 10526 8108040008 WERWAWAN MALUKU 259 Phase 3 105 107 730 20.4 128.09686 -8.26671 10527 8101054003 ALUSI TAMRIAN MALUKU 16 Phase 3 4 4 104 0.8 131.58010 -7.67068 10528 8172020003 TAYANDO YAMRU MALUKU 459 Phase 3 96 98 496 18.6 132.31823 -5.55259 10529 8171020016 BATU MERAH MALUKU 312 Phase 1 73 74 898 14.2 128.21531 -3.67730 10530 5306010034 OAN MANE NUSA TENGGARA TIMUR 744 Phase 1 238 167 314 36.1 124.94096 -9.62344 10531 5313123003 TENGKU LESE NUSA TENGGARA TIMUR 119 Phase 1 27 22 923 4.9 120.39000 -8.55010 10532 5309070015 LAMATEWELU NUSA TENGGARA TIMUR 268 Phase 1 83 70 467 15.2 123.22886 -8.34492 10533 8203021004 SOAMOLE MALUKU UTARA 671 Phase 1 133 136 458 27.5 125.97189 -2.23900 10534 5302040012 KALIUDA NUSA TENGGARA TIMUR 115 Phase 1 23 16 169 3.5 120.70568 -10.16536 10535 8105031004 BENJURING MALUKU 651 Phase 3 158 162 108 30.7 134.81317 -5.74100 10536 8108040008 WERWAWAN MALUKU 156 Phase 3 63 64 638 12.2 128.11129 -8.27185 10537 8172020002 TAYANDO OHOIEL MALUKU 1 141 Phase 3 270 277 020 52.4 132.31800 -5.60419 10538 5306010013 SIKUN NUSA TENGGARA TIMUR 539 Phase 1 160 112 480 24.3 124.93430 -9.62946 10539 5313123003 TENGKU LESE NUSA TENGGARA TIMUR 243 Phase 1 55 46 695 10.1 120.39439 -8.55652 10540 5309070011 LAMALOTA NUSA TENGGARA TIMUR 687 Phase 1 207 175 743 37.9 123.22817 -8.34333 10541 8201091018 MOISO MALUKU UTARA 439 Phase 1 93 95 418 19.2 127.51177 0.90626 10542 8103100005 WAAI MALUKU 1 280 Phase 1 282 289 332 54.7 128.35198 -3.52396 10543 5302040012 KALIUDA NUSA TENGGARA TIMUR 78 Phase 1 16 11 248 2.4 120.70097 -10.16353 10544 8108040008 WERWAWAN MALUKU 193 Phase 3 78 80 028 15.1 128.11718 -8.27202 10545 8105031003 KUMUL MALUKU 697 Phase 3 121 124 146 23.5 134.79419 -5.78560 10546 8172020004 TAYANDO YAMTEL MALUKU 293 Phase 3 68 69 768 13.2 132.17176 -5.73292 10547 5304091008 BINENOK NUSA TENGGARA TIMUR 297 Phase 1 78 54 834 11.8 124.60411 -9.91954 10548 5313120018 BEO RAHONG NUSA TENGGARA TIMUR 157 Phase 1 40 33 960 7.3 120.39815 -8.56167 10549 5309070015 LAMATEWELU NUSA TENGGARA TIMUR 162 Phase 1 50 42 450 9.2 123.23199 -8.34559 10550 8204041002 WAYAUA MALUKU UTARA 2 587 Phase 1 575 589 950 118.9 127.64453 -0.74435 10551 8107011021 KELDOR MALUKU 504 Phase 1 302 309 852 58.6 131.65140 -4.48994 10552 5302040012 KALIUDA NUSA TENGGARA TIMUR 1 232 Phase 1 246 172 938 37.3 120.69947 -10.16418 10553 8108040009 KETTY MALUKU 115 Phase 3 33 33 858 6.4 128.14833 -8.28021 10554 8105031002 BATULEY MALUKU 225 Phase 3 73 74 898 14.2 134.80854 -5.80944 10555 8172020004 TAYANDO YAMTEL MALUKU 1 964 Phase 3 453 464 778 87.9 132.17239 -5.74516 10556 5304091002 NUNBENA NUSA TENGGARA TIMUR 503 Phase 1 132 92 796 20.0 124.59650 -9.93245 10557 5313120018 BEO RAHONG NUSA TENGGARA TIMUR 149 Phase 1 38 32 262 7.0 120.40251 -8.56014 10558 5310050005 UMAGERA NUSA TENGGARA TIMUR 255 Phase 1 52 44 148 9.5 122.27559 -8.67045 10559 8205022003 BOULAMO MALUKU UTARA 166 Phase 1 53 54 378 11.0 127.97614 1.33469 10560 8107011011 GULIAR MALUKU 503 Phase 1 302 309 852 58.6 131.65597 -4.47658 10561 5317050007 KABALI DANA NUSA TENGGARA TIMUR 771 Phase 1 146 102 638 22.1 119.25617 -9.52843 10562 8108040009 KETTY MALUKU 240 Phase 3 67 68 742 13.0 128.15653 -8.28016 10563 8105031022 WARIA MALUKU 438 Phase 3 99 101 574 19.2 134.76190 -5.85481 10564 8102012008 WARBAL MALUKU 751 Phase 3 154 158 004 29.9 132.60773 -5.82906 10565 5304091002 NUNBENA NUSA TENGGARA TIMUR 300 Phase 1 79 55 537 12.0 124.59060 -9.93353 10566 5313123004 GOLO LANGKOK NUSA TENGGARA TIMUR 108 Phase 1 24 20 376 4.4 120.40412 -8.55594 10567 5310050005 UMAGERA NUSA TENGGARA TIMUR 513 Phase 1 103 87 447 18.9 122.27667 -8.67630 10568 8205022002 DORO MALUKU UTARA 1 657 Phase 1 419 429 894 86.6 127.99546 1.32970 10569 8104020004 NAMLEA MALUKU 52 Phase 1 10 10 260 1.9 127.10431 -3.26809 10570 5317050008 WATU LAMBARA NUSA TENGGARA TIMUR 1 497 Phase 1 273 191 919 41.4 119.26412 -9.53128 10571 8108040012 LOLOTWARA MALUKU 375 Phase 3 84 86 184 16.3 128.19663 -8.27977 10572 8105031027 SEWER MALUKU 399 Phase 3 84 86 184 16.3 134.75074 -5.88358 10573 8102022003 FEER MALUKU 120 Phase 3 34 34 884 6.6 132.90011 -5.93160 10574 5304091007 O'OBIBI NUSA TENGGARA TIMUR 1 386 Phase 1 336 236 208 51.0 124.58800 -9.94503 10575 5313123004 GOLO LANGKOK NUSA TENGGARA TIMUR 1 047 Phase 1 229 194 421 42.0 120.40520 -8.55253 10576 5310052004 KOKOWAHOR NUSA TENGGARA TIMUR 36 Phase 1 10 8 490 1.8 122.27333 -8.67710 10577 8205022004 DARU MALUKU UTARA 1 627 Phase 1 411 421 686 85.0 127.98153 1.30881 10578 8104020004 NAMLEA MALUKU 33 Phase 1 7 7 182 1.4 127.10479 -3.26746 10579 5317050002 KALEMBU TILU NUSA TENGGARA TIMUR 28 Phase 1 6 4 218 0.9 119.24995 -9.53826 10580 8108040011 YAMLULI MALUKU 178 Phase 3 49 50 274 9.5 128.21840 -8.22304 10581 8105031028 JURSIANG MALUKU 448 Phase 3 98 100 548 19.0 134.78141 -5.89695 10582 8102022013 NERONG MALUKU 242 Phase 3 23 23 598 4.5 132.93791 -5.75278 10583 5304091001 KOT'OLIN NUSA TENGGARA TIMUR 827 Phase 1 258 181 374 39.1 124.59270 -9.94752 10584 5313123004 GOLO LANGKOK NUSA TENGGARA TIMUR 180 Phase 1 40 33 960 7.3 120.41198 -8.55101 10585 5310050005 UMAGERA NUSA TENGGARA TIMUR 342 Phase 1 69 58 581 12.6 122.27358 -8.67850 10586 8201091013 GAMLENGE MALUKU UTARA 284 Phase 1 77 79 002 15.9 127.51149 0.92582 10587 8104020004 NAMLEA MALUKU 334 Phase 1 63 64 638 12.2 127.10571 -3.26677 10588 5317050002 KALEMBU TILU NUSA TENGGARA TIMUR 887 Phase 1 159 111 777 24.1 119.25043 -9.53882 10589 8108040010 SERA MALUKU 383 Phase 3 74 75 924 14.4 128.17237 -8.21207 10590 8105031029 KOBAMAR MALUKU 252 Phase 3 76 77 976 14.7 134.80271 -5.87606 10591 8102022001 WEDUAR FEER MALUKU 161 Phase 3 50 51 300 9.7 132.84874 -5.99077 10592 5304091001 KOT'OLIN NUSA TENGGARA TIMUR 193 Phase 1 60 42 180 9.1 124.59648 -9.94912 10593 5313123004 GOLO LANGKOK NUSA TENGGARA TIMUR 472 Phase 1 104 88 296 19.1 120.41563 -8.54957 10594 5310052002 MEKENDETUN NUSA TENGGARA TIMUR 73 Phase 1 20 16 980 3.7 122.26804 -8.67846 Annex II – Demand forecast results Page 7 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 10595 8201091012 DOMATO MALUKU UTARA 36 Phase 1 8 8 208 1.7 127.51221 0.92327 10596 8104020004 NAMLEA MALUKU 696 Phase 1 132 135 432 25.6 127.10643 -3.26489 10597 5317050002 KALEMBU TILU NUSA TENGGARA TIMUR 1 973 Phase 1 353 248 159 53.5 119.25876 -9.54665 10598 8108040008 WERWAWAN MALUKU 261 Phase 3 106 108 756 20.6 128.14728 -8.21862 10599 8105010025 REBI MALUKU 594 Phase 3 178 182 628 34.5 134.11927 -6.38133 10600 8102012006 UR PULAU MALUKU 605 Phase 3 105 107 730 20.4 132.54539 -5.87827 10601 5304091001 KOT'OLIN NUSA TENGGARA TIMUR 320 Phase 1 100 70 300 15.2 124.59622 -9.95253 10602 5313123004 GOLO LANGKOK NUSA TENGGARA TIMUR 332 Phase 1 73 61 977 13.4 120.41782 -8.54955 10603 5310052004 KOKOWAHOR NUSA TENGGARA TIMUR 595 Phase 1 161 136 689 29.5 122.26650 -8.67467 10604 8201091018 MOISO MALUKU UTARA 180 Phase 1 38 38 988 7.9 127.51170 0.92288 10605 8104020004 NAMLEA MALUKU 1 797 Phase 1 339 347 814 65.8 127.10861 -3.25619 10606 5317050012 MAROKOTA NUSA TENGGARA TIMUR 1 185 Phase 1 250 175 750 37.9 119.16423 -9.49901 10607 8108040011 YAMLULI MALUKU 69 Phase 3 19 19 494 3.7 128.21976 -8.22310 10608 8105031021 JERWATU MALUKU 267 Phase 3 60 61 560 11.6 134.47621 -5.44366 10609 8102022004 KILWAT MALUKU 85 Phase 3 22 22 572 4.3 132.92887 -5.88577 10610 5304091001 KOT'OLIN NUSA TENGGARA TIMUR 553 Phase 1 172 120 916 26.1 124.59967 -9.95398 10611 5313123004 GOLO LANGKOK NUSA TENGGARA TIMUR 175 Phase 1 39 33 111 7.1 120.42065 -8.54967 10612 5307012005 BUNGA BALI NUSA TENGGARA TIMUR 817 Phase 1 222 188 478 40.7 124.27955 -8.33830 10613 8204062004 LALUIN MALUKU UTARA 2 312 Phase 1 474 486 324 98.0 127.42836 -0.04162 10614 8103080019 TUHAHA MALUKU 2 222 Phase 1 470 482 220 91.2 128.71545 -3.55590 10615 5317050012 MAROKOTA NUSA TENGGARA TIMUR 783 Phase 1 166 116 698 25.2 119.16914 -9.49269 10616 8105020016 MAIJURING MALUKU 585 Phase 3 180 184 680 34.9 134.15449 -6.02094 10617 8108060001 LUANG BARAT MALUKU 858 Phase 3 204 209 304 39.6 128.69240 -8.17535 10618 5304091001 KOT'OLIN NUSA TENGGARA TIMUR 108 Phase 1 34 23 902 5.2 124.59737 -9.95818 10619 5313123006 LIANG BUA NUSA TENGGARA TIMUR 283 Phase 1 61 51 789 11.2 120.42267 -8.54869 10620 5310050006 IAN TENA NUSA TENGGARA TIMUR 166 Phase 1 42 35 658 7.7 122.28735 -8.66576 10621 8272050006 SOFIFI MALUKU UTARA 104 Phase 1 26 26 676 5.4 127.55656 0.73504 10622 8107040017 BULA AIR FATTOLO MALUKU 1 698 Phase 1 302 309 852 58.6 130.56159 -3.14488 10623 5317050012 MAROKOTA NUSA TENGGARA TIMUR 902 Phase 1 191 134 273 29.0 119.16458 -9.48709 10624 8105020039 WAKUA MALUKU 1 174 Phase 3 197 202 122 38.2 134.53948 -5.94616 10625 8108060002 LUANG TIMUR MALUKU 758 Phase 3 247 253 422 47.9 128.70490 -8.19097 10626 5304091001 KOT'OLIN NUSA TENGGARA TIMUR 172 Phase 1 54 37 962 8.2 124.59941 -9.96279 10627 5313123007 BANGKA AJANG NUSA TENGGARA TIMUR 960 Phase 1 213 180 837 39.0 120.41971 -8.54262 10628 5310050006 IAN TENA NUSA TENGGARA TIMUR 330 Phase 1 83 70 467 15.2 122.28745 -8.66873 10629 8104020006 KARANG JAYA MALUKU 2 299 Phase 1 608 623 808 118.0 127.08320 -3.22505 10630 5301050002 WEE KAROU NUSA TENGGARA TIMUR 6 377 Phase 1 840 590 520 127.4 119.38837 -9.64142 10631 8271021008 MARIKURUBU MALUKU UTARA 106 Phase 1 26 26 676 5.4 127.36245 0.78996 10632 8105021012 DOSINAMALAU MALUKU 716 Phase 3 124 127 224 24.1 134.56059 -6.02345 10633 8108060003 ELO MALUKU 725 Phase 3 157 161 082 30.5 128.85732 -8.18342 10634 5304091004 HOIBETI NUSA TENGGARA TIMUR 1 607 Phase 1 438 307 914 66.4 124.59780 -9.96486 10635 5313123006 LIANG BUA NUSA TENGGARA TIMUR 553 Phase 1 119 101 031 21.8 120.42874 -8.54395 10636 5310050007 KOPONG NUSA TENGGARA TIMUR 202 Phase 1 50 42 450 9.2 122.28911 -8.67037 10637 8107010013 MIDA MALUKU 632 Phase 1 119 122 094 23.1 131.42433 -4.05932 10638 5317060020 WEE LIMA NUSA TENGGARA TIMUR 625 Phase 1 126 88 578 19.1 119.38140 -9.56187 10639 8271021008 MARIKURUBU MALUKU UTARA 308 Phase 1 74 75 924 15.3 127.35792 0.79031 10640 8105031010 WAFAN MALUKU 148 Phase 3 32 32 832 6.2 134.60905 -5.54427 10641 8108060006 ROMDARA MALUKU 314 Phase 3 66 67 716 12.8 128.88448 -8.18495 10642 5305051002 OERINBESI NUSA TENGGARA TIMUR 81 Phase 1 24 16 872 3.6 124.78127 -9.34606 10643 5313123006 LIANG BUA NUSA TENGGARA TIMUR 1 352 Phase 1 291 247 059 53.3 120.43578 -8.54685 10644 5308070016 LEUWOHUNG NUSA TENGGARA TIMUR 755 Phase 1 161 136 689 29.5 123.78387 -8.18631 10645 8107010011 AMARWAWATU MALUKU 1 873 Phase 1 360 369 360 69.9 131.43906 -4.05688 10646 5317060020 WEE LIMA NUSA TENGGARA TIMUR 610 Phase 1 123 86 469 18.7 119.38446 -9.56338 10647 8271021001 MALIARO MALUKU UTARA 330 Phase 1 66 67 716 13.6 127.36361 0.78460 10648 8105031009 WAIFUAL MALUKU 224 Phase 3 56 57 456 10.9 134.59799 -5.56675 10649 8108060007 MAHALETA MALUKU 76 Phase 3 20 20 520 3.9 128.91947 -8.18909 10650 5305051003 OEKOPA NUSA TENGGARA TIMUR 131 Phase 1 33 23 199 5.0 124.78496 -9.33785 10651 5313040036 JAONG NUSA TENGGARA TIMUR 1 011 Phase 1 237 201 213 43.4 120.38275 -8.62981 10652 5307060016 TERNATE SELATAN NUSA TENGGARA TIMUR 91 Phase 1 29 24 621 5.3 124.37747 -8.22003 10653 8107010027 SAGEY MALUKU 359 Phase 1 302 309 852 58.6 131.44578 -4.06376 10654 5317060020 WEE LIMA NUSA TENGGARA TIMUR 535 Phase 1 108 75 924 16.4 119.38724 -9.56430 10655 8272020012 MAITARA SELATAN MALUKU UTARA 589 Phase 1 135 138 510 27.9 127.37297 0.72525 10656 8108060005 LELANG MALUKU 514 Phase 3 94 96 444 18.2 128.92492 -8.21606 10657 5305051002 OERINBESI NUSA TENGGARA TIMUR 719 Phase 1 213 149 739 32.3 124.79081 -9.34030 10658 5313123005 COMPANG DARI NUSA TENGGARA TIMUR 145 Phase 1 36 30 564 6.6 120.40452 -8.54496 10659 5307060016 TERNATE SELATAN NUSA TENGGARA TIMUR 659 Phase 1 205 174 045 37.6 124.36713 -8.22304 10660 8107010026 TINUS ILUR MALUKU 214 Phase 1 302 309 852 58.6 131.44149 -4.06692 10661 5317060020 WEE LIMA NUSA TENGGARA TIMUR 374 Phase 1 75 52 725 11.4 119.38662 -9.55009 10662 8271013002 TAFRAKA MALUKU UTARA 116 Phase 1 26 26 676 5.4 127.32244 0.88301 10663 8105011003 MEROR MALUKU 114 Phase 3 29 29 754 5.6 134.32396 -6.83802 10664 8108060007 MAHALETA MALUKU 261 Phase 3 68 69 768 13.2 128.93605 -8.18978 10665 5305051003 OEKOPA NUSA TENGGARA TIMUR 1 406 Phase 1 350 246 050 53.1 124.78499 -9.33380 10666 5313123005 COMPANG DARI NUSA TENGGARA TIMUR 180 Phase 1 45 38 205 8.2 120.40272 -8.54433 10667 5307060016 TERNATE SELATAN NUSA TENGGARA TIMUR 115 Phase 1 36 30 564 6.6 124.37759 -8.21125 10668 8107010012 KOTA SIRI MALUKU 1 414 Phase 1 285 292 410 55.3 131.43435 -4.04188 10669 5317070001 WANO TALLA NUSA TENGGARA TIMUR 1 707 Phase 1 414 291 042 62.8 119.39074 -9.54422 10670 8271013002 TAFRAKA MALUKU UTARA 426 Phase 1 96 98 496 19.8 127.31498 0.88321 10671 8105011002 SALAREM MALUKU 138 Phase 3 34 34 884 6.6 134.27656 -6.87548 10672 8108060008 ROTNAMA MALUKU 221 Phase 3 49 50 274 9.5 128.97757 -8.19597 10673 5320020007 DAIEKO NUSA TENGGARA TIMUR 1 853 Phase 1 447 314 241 67.8 121.75841 -10.55771 10674 5313123005 COMPANG DARI NUSA TENGGARA TIMUR 506 Phase 1 125 106 125 22.9 120.40470 -8.54131 10675 5307060017 TERNATE NUSA TENGGARA TIMUR 415 Phase 1 98 83 202 18.0 124.37666 -8.20984 10676 8107010014 KILKODA MALUKU 1 929 Phase 1 392 402 192 76.1 131.41823 -4.03170 10677 5301072009 WANOKAZA NUSA TENGGARA TIMUR 636 Phase 1 139 97 717 21.1 119.40423 -9.53943 10678 8271013001 DORARI ISA MALUKU UTARA 463 Phase 1 114 116 964 23.6 127.31414 0.88465 10679 8105011002 SALAREM MALUKU 234 Phase 3 56 57 456 10.9 134.25540 -6.88422 Annex II – Demand forecast results Page 8 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 10680 8108060010 PUPIOLIORA MALUKU 46 Phase 3 14 14 364 2.7 128.99986 -8.20990 10681 5306051002 KABUNA NUSA TENGGARA TIMUR 822 Phase 1 195 137 085 29.6 124.88553 -9.06550 10682 5313123005 COMPANG DARI NUSA TENGGARA TIMUR 351 Phase 1 87 73 863 15.9 120.40524 -8.53636 10683 5307060017 TERNATE NUSA TENGGARA TIMUR 656 Phase 1 155 131 595 28.4 124.36760 -8.20879 10684 8107010021 BAS MALUKU 503 Phase 1 302 309 852 58.6 131.43468 -4.01978 10685 5301072009 WANOKAZA NUSA TENGGARA TIMUR 778 Phase 1 170 119 510 25.8 119.40542 -9.54230 10686 8271013003 TOGOLOBE MALUKU UTARA 60 Phase 1 16 16 416 3.3 127.32574 0.88537 10687 8105011001 BATUGOYANG MALUKU 90 Phase 3 25 25 650 4.9 134.23742 -6.89314 10688 8108060010 PUPIOLIORA MALUKU 212 Phase 3 62 63 612 12.0 129.00068 -8.21013 10689 5314030011 TUANATUK NUSA TENGGARA TIMUR 708 Phase 1 188 132 164 28.5 123.02608 -10.75115 10690 5313123008 BUAR NUSA TENGGARA TIMUR 263 Phase 1 59 50 091 10.8 120.39844 -8.53343 10691 5307060018 PULAU BUAYA NUSA TENGGARA TIMUR 130 Phase 1 36 30 564 6.6 124.37476 -8.18310 10692 8107010022 TUHA MALUKU 284 Phase 1 302 309 852 58.6 131.43397 -4.01643 10693 5301050006 DOKA KAKA NUSA TENGGARA TIMUR 680 Phase 1 149 104 747 22.6 119.43601 -9.57294 10694 8271013003 TOGOLOBE MALUKU UTARA 398 Phase 1 103 105 678 21.3 127.32871 0.88871 10695 8105011001 BATUGOYANG MALUKU 94 Phase 3 26 26 676 5.0 134.22214 -6.90016 10696 8108060010 PUPIOLIORA MALUKU 157 Phase 3 46 47 196 8.9 129.01191 -8.21335 10697 5304040012 NULLE NUSA TENGGARA TIMUR 741 Phase 1 205 144 115 31.1 124.33624 -9.88756 10698 5313123008 BUAR NUSA TENGGARA TIMUR 117 Phase 1 26 22 074 4.8 120.39870 -8.53020 10699 5307060018 PULAU BUAYA NUSA TENGGARA TIMUR 1 104 Phase 1 302 256 398 55.3 124.37576 -8.18304 10700 8107010023 ARAN MALUKU 396 Phase 1 302 309 852 58.6 131.43318 -4.01266 10701 5317010005 WAI HA NUSA TENGGARA TIMUR 2 591 Phase 1 434 305 102 65.8 119.06305 -9.63116 10702 8202042011 BAKA JAYA MALUKU UTARA 569 Phase 1 91 93 366 18.8 128.77779 0.27590 10703 8105011001 BATUGOYANG MALUKU 170 Phase 3 47 48 222 9.1 134.20053 -6.91889 10704 8108060011 REGOHA MALUKU 430 Phase 3 86 88 236 16.7 129.00930 -8.23135 10705 5314020004 TEMAS NUSA TENGGARA TIMUR 1 176 Phase 1 281 197 543 42.6 122.93377 -10.80472 10706 5313123009 BENTENG TUBI NUSA TENGGARA TIMUR 457 Phase 1 102 86 598 18.7 120.40107 -8.52266 10707 5310052003 BLATATATIN NUSA TENGGARA TIMUR 173 Phase 1 45 38 205 8.2 122.27357 -8.69104 10708 8107010016 MIRAN MALUKU 1 346 Phase 1 209 214 434 40.6 131.42178 -4.00160 10709 5317010003 WAI KARARA NUSA TENGGARA TIMUR 3 057 Phase 1 568 399 304 86.2 119.07550 -9.65951 10710 8272010002 MAREGAM MALUKU UTARA 497 Phase 1 123 126 198 25.4 127.40997 0.58040 10711 8105020040 MARIRIMAR MALUKU 7 Phase 3 2 2 052 0.4 134.39662 -6.04154 10712 8108060009 BATU GAJAH MALUKU 321 Phase 3 58 59 508 11.3 128.97193 -8.21544 10713 5314010014 LEKIK NUSA TENGGARA TIMUR 801 Phase 1 184 129 352 27.9 122.99751 -10.84388 10714 5313123009 BENTENG TUBI NUSA TENGGARA TIMUR 437 Phase 1 97 82 353 17.8 120.40865 -8.52360 10715 5308070012 KAOHUA NUSA TENGGARA TIMUR 298 Phase 1 73 61 977 13.4 123.83315 -8.20160 10716 8107010017 RARAT MALUKU 883 Phase 1 152 155 952 29.5 131.41140 -3.97954 10717 5317010002 PANENGGO EDE NUSA TENGGARA TIMUR 3 952 Phase 1 637 447 811 96.6 119.06081 -9.68276 10718 8272010001 MAREKOFO MALUKU UTARA 53 Phase 1 13 13 338 2.7 127.39141 0.56283 10719 8108060004 ROMKISAR MALUKU 240 Phase 3 57 58 482 11.1 128.87755 -8.21167 10720 5306040004 LITAMALI NUSA TENGGARA TIMUR 662 Phase 1 152 106 856 23.1 124.98468 -9.51778 10721 5313123009 BENTENG TUBI NUSA TENGGARA TIMUR 642 Phase 1 143 121 407 26.2 120.40979 -8.51983 10722 5308070011 KALIKUR WL NUSA TENGGARA TIMUR 201 Phase 1 57 48 393 10.4 123.83526 -8.20179 10723 8107010018 ONDOR MALUKU 1 312 Phase 1 267 273 942 51.8 131.38776 -3.98747 10724 5301022002 RUA NUSA TENGGARA TIMUR 1 352 Phase 1 290 203 870 44.0 119.40600 -9.76996 10725 8272010001 MAREKOFO MALUKU UTARA 482 Phase 1 118 121 068 24.4 127.38339 0.56581 10726 8108080017 WAKPAPAPI MALUKU 667 Phase 3 67 68 742 13.0 129.78336 -7.92842 10727 5314010006 OEBOU NUSA TENGGARA TIMUR 1 766 Phase 1 413 290 339 62.6 122.93909 -10.90630 10728 5313123008 BUAR NUSA TENGGARA TIMUR 418 Phase 1 93 78 957 17.0 120.39494 -8.53259 10729 5308070011 KALIKUR WL NUSA TENGGARA TIMUR 672 Phase 1 190 161 310 34.8 123.84065 -8.20781 10730 8107010019 KATALOKA MALUKU 6 995 Phase 1 1 289 1 322 514 250.1 131.38045 -3.95966 10731 5317050012 MAROKOTA NUSA TENGGARA TIMUR 900 Phase 1 190 133 570 28.8 119.16470 -9.47522 10732 8271011005 KOTA MOTI MALUKU UTARA 1 016 Phase 1 261 267 786 54.0 127.41711 0.47886 10733 8108080010 LATALOLA KECIL MALUKU 145 Phase 3 31 31 806 6.0 129.90599 -8.12263 10734 5305010001 NOEPESU NUSA TENGGARA TIMUR 256 Phase 1 77 54 131 11.7 124.28848 -9.56637 10735 5313123010 MANONG NUSA TENGGARA TIMUR 525 Phase 1 125 106 125 22.9 120.41576 -8.51057 10736 5310031008 KLOANGPOPOT NUSA TENGGARA TIMUR 1 045 Phase 1 145 123 105 26.6 122.35433 -8.71919 10737 8107010033 KELIBINGAN MALUKU 599 Phase 1 302 309 852 58.6 131.39833 -4.02580 10738 5317050012 MAROKOTA NUSA TENGGARA TIMUR 593 Phase 1 126 88 578 19.1 119.16016 -9.47346 10739 8271011005 KOTA MOTI MALUKU UTARA 180 Phase 1 47 48 222 9.7 127.42452 0.47201 10740 8108080002 IBLATMUNTAH MALUKU 86 Phase 3 20 20 520 3.9 129.81919 -8.20969 10741 5304012004 BONLEU NUSA TENGGARA TIMUR 62 Phase 1 16 11 248 2.4 124.29148 -9.57027 10742 5313123010 MANONG NUSA TENGGARA TIMUR 497 Phase 1 119 101 031 21.8 120.41213 -8.50656 10743 5310031008 KLOANGPOPOT NUSA TENGGARA TIMUR 263 Phase 1 58 49 242 10.6 122.36207 -8.71878 10744 8107010015 DAI MALUKU 1 938 Phase 1 323 331 398 62.7 131.39978 -4.00963 10745 5316010009 MAKATA KERI NUSA TENGGARA TIMUR 919 Phase 1 136 95 608 20.6 119.56968 -9.59944 10746 8271011004 TADENAS MALUKU UTARA 349 Phase 1 86 88 236 17.8 127.43157 0.46174 10747 5304012004 BONLEU NUSA TENGGARA TIMUR 1 075 Phase 1 272 191 216 41.3 124.28973 -9.57178 10748 5313040036 JAONG NUSA TENGGARA TIMUR 290 Phase 1 68 57 732 12.5 120.38245 -8.63197 10749 5310031008 KLOANGPOPOT NUSA TENGGARA TIMUR 121 Phase 1 27 22 923 4.9 122.36518 -8.71695 10750 8103060008 WOTAY MALUKU 704 Phase 1 149 152 874 28.9 129.02009 -3.22420 10751 5316011004 WAI LAWA NUSA TENGGARA TIMUR 1 405 Phase 1 270 189 810 41.0 119.54137 -9.61944 10752 8271011004 TADENAS MALUKU UTARA 93 Phase 1 23 23 598 4.8 127.43516 0.45590 10753 5306013001 FOREKMODOK NUSA TENGGARA TIMUR 57 Phase 1 13 9 139 2.0 124.92720 -9.61318 10754 5313123008 BUAR NUSA TENGGARA TIMUR 194 Phase 1 44 37 356 8.1 120.38809 -8.52666 10755 5310031008 KLOANGPOPOT NUSA TENGGARA TIMUR 156 Phase 1 35 29 715 6.4 122.36556 -8.71502 10756 8104020007 UBUNG MALUKU 1 976 Phase 1 412 422 712 79.9 127.07468 -3.19908 10757 5317010013 RADA LOKO NUSA TENGGARA TIMUR 1 823 Phase 1 296 208 088 44.9 119.03666 -9.57986 10758 8271011003 TAFAGA MALUKU UTARA 628 Phase 1 143 146 718 29.6 127.43219 0.44356 10759 5306013001 FOREKMODOK NUSA TENGGARA TIMUR 96 Phase 1 22 15 466 3.3 124.92387 -9.61134 10760 5313123008 BUAR NUSA TENGGARA TIMUR 361 Phase 1 81 68 769 14.8 120.38673 -8.52449 10761 5310031008 KLOANGPOPOT NUSA TENGGARA TIMUR 386 Phase 1 85 72 165 15.6 122.36362 -8.71438 10762 8103050012 MAKARIKI MALUKU 1 214 Phase 1 258 264 708 50.1 128.98948 -3.26058 10763 5317050011 REDA PADA NUSA TENGGARA TIMUR 236 Phase 1 51 35 853 7.7 119.20236 -9.49988 10764 8271011003 TAFAGA MALUKU UTARA 145 Phase 1 33 33 858 6.8 127.42528 0.43733 Annex II – Demand forecast results Page 9 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 10765 5306013001 FOREKMODOK NUSA TENGGARA TIMUR 321 Phase 1 71 49 913 10.8 124.92557 -9.60802 10766 5313123008 BUAR NUSA TENGGARA TIMUR 602 Phase 1 134 113 766 24.5 120.38367 -8.52520 10767 5310031016 WOLONTERANG NUSA TENGGARA TIMUR 220 Phase 1 49 41 601 9.0 122.36878 -8.72357 10768 8171020016 BATU MERAH MALUKU 425 Phase 1 99 101 574 19.2 128.22294 -3.67737 10769 5317050011 REDA PADA NUSA TENGGARA TIMUR 545 Phase 1 117 82 251 17.7 119.20448 -9.49706 10770 8271011002 TAKOFI MALUKU UTARA 92 Phase 1 21 21 546 4.3 127.41736 0.43369 10771 5306013001 FOREKMODOK NUSA TENGGARA TIMUR 202 Phase 1 45 31 635 6.8 124.92170 -9.61472 10772 5313123011 BANGKA RUANG NUSA TENGGARA TIMUR 431 Phase 1 96 81 504 17.6 120.38138 -8.51313 10773 5310031016 WOLONTERANG NUSA TENGGARA TIMUR 209 Phase 1 46 39 054 8.4 122.37312 -8.72011 10774 8104020008 JIKUMERASA MALUKU 910 Phase 1 202 207 252 39.2 127.02584 -3.17360 10775 5317050011 REDA PADA NUSA TENGGARA TIMUR 561 Phase 1 89 62 567 13.5 119.20747 -9.49614 10776 8204070011 RABUTDAIO MALUKU UTARA 836 Phase 1 190 194 940 39.3 127.41751 0.37328 10777 5306013001 FOREKMODOK NUSA TENGGARA TIMUR 107 Phase 1 24 16 872 3.6 124.92377 -9.61703 10778 5313123011 BANGKA RUANG NUSA TENGGARA TIMUR 1 059 Phase 1 235 199 515 43.0 120.38368 -8.50617 10779 5310031009 WATUMERAK NUSA TENGGARA TIMUR 946 Phase 1 235 199 515 43.0 122.37609 -8.71341 10780 8104020008 JIKUMERASA MALUKU 1 312 Phase 1 291 298 566 56.5 127.03072 -3.17423 10781 5317050011 REDA PADA NUSA TENGGARA TIMUR 639 Phase 1 137 96 311 20.8 119.20136 -9.50032 10782 8204070022 KOTA MALUKU UTARA 337 Phase 1 82 84 132 17.0 127.42221 0.36597 10783 5306010016 LASAEN NUSA TENGGARA TIMUR 66 Phase 1 17 11 951 2.6 124.92037 -9.61840 10784 5313123010 MANONG NUSA TENGGARA TIMUR 438 Phase 1 105 89 145 19.2 120.41522 -8.50212 10785 5310031010 WOGALIRIT NUSA TENGGARA TIMUR 1 250 Phase 1 193 163 857 35.4 122.39267 -8.70138 10786 8106021003 LUHU MALUKU 1 176 Phase 1 193 198 018 37.4 127.93251 -3.32674 10787 5317060013 KANELU NUSA TENGGARA TIMUR 2 281 Phase 1 305 214 415 46.3 119.29708 -9.52142 10788 8204070021 GORUP MALUKU UTARA 351 Phase 1 82 84 132 17.0 127.42332 0.36472 10789 5306010016 LASAEN NUSA TENGGARA TIMUR 393 Phase 1 96 67 488 14.6 124.91547 -9.61930 10790 5315040008 SAMA NUSA TENGGARA TIMUR 667 Phase 1 137 116 313 25.1 120.33337 -8.54646 10791 5310031012 NEN BURA NUSA TENGGARA TIMUR 2 108 Phase 1 387 328 563 70.9 122.40537 -8.71642 10792 8106021003 LUHU MALUKU 2 550 Phase 1 418 428 868 81.1 127.93044 -3.31537 10793 5317030008 MANGGA NIPI NUSA TENGGARA TIMUR 361 Phase 1 111 78 033 16.8 119.03026 -9.48403 10794 8204070020 WALO MALUKU UTARA 257 Phase 1 74 75 924 15.3 127.42477 0.36266 10795 5306010016 LASAEN NUSA TENGGARA TIMUR 175 Phase 1 43 30 229 6.5 124.91209 -9.61848 10796 5315030018 PONTO ARA NUSA TENGGARA TIMUR 108 Phase 1 26 22 074 4.8 120.24843 -8.69946 10797 5309074001 TIKATUKANG NUSA TENGGARA TIMUR 159 Phase 1 49 41 601 9.0 123.19037 -8.30136 10798 8106020020 PIRU MALUKU 7 261 Phase 1 2 270 2 329 020 440.5 128.19505 -3.06531 10799 5317030008 MANGGA NIPI NUSA TENGGARA TIMUR 310 Phase 1 95 66 785 14.4 119.02405 -9.48166 10800 8204070019 DALAM MALUKU UTARA 408 Phase 1 94 96 444 19.4 127.42690 0.36044 10801 5306013002 LAMUDUR NUSA TENGGARA TIMUR 925 Phase 1 231 162 393 35.0 124.91140 -9.61709 10802 5315030009 KAKOR NUSA TENGGARA TIMUR 15 Phase 1 4 3 396 0.7 120.24989 -8.70764 10803 5309074001 TIKATUKANG NUSA TENGGARA TIMUR 100 Phase 1 31 26 319 5.7 123.18839 -8.30156 10804 8103060001 USLIAPAN MALUKU 536 Phase 1 138 141 588 26.8 128.96931 -3.21492 10805 5317030008 MANGGA NIPI NUSA TENGGARA TIMUR 537 Phase 1 164 115 292 24.9 119.01666 -9.48190 10806 8204070018 GITANG MALUKU UTARA 515 Phase 1 131 134 406 27.1 127.43104 0.35706 10807 5314070001 OENGGAUT NUSA TENGGARA TIMUR 1 060 Phase 1 239 168 017 36.3 122.83607 -10.90913 10808 5315030009 KAKOR NUSA TENGGARA TIMUR 149 Phase 1 36 30 564 6.6 120.25061 -8.70784 10809 5309070059 GELONG NUSA TENGGARA TIMUR 409 Phase 1 73 61 977 13.4 123.18129 -8.31456 10810 8104020005 LALA MALUKU 691 Phase 1 148 151 848 28.7 127.09617 -3.22301 10811 5302060010 PALAKAHEMBI NUSA TENGGARA TIMUR 365 Phase 1 93 65 379 14.1 120.48457 -9.69435 10812 8204070010 KYOWOR MALUKU UTARA 653 Phase 1 187 191 862 38.7 127.43537 0.35189 10813 5305060006 TUALENE NUSA TENGGARA TIMUR 16 Phase 1 5 3 515 0.8 124.81741 -9.30320 10814 5315030018 PONTO ARA NUSA TENGGARA TIMUR 270 Phase 1 64 54 336 11.7 120.25842 -8.70165 10815 5309062007 NUBALEMA NUSA TENGGARA TIMUR 174 Phase 1 39 33 111 7.1 123.16943 -8.30969 10816 8104020005 LALA MALUKU 368 Phase 1 79 81 054 15.3 127.10070 -3.22328 10817 5302060010 PALAKAHEMBI NUSA TENGGARA TIMUR 1 156 Phase 1 294 206 682 44.6 120.49190 -9.70188 10818 8204070009 MATANGTENGIN MALUKU UTARA 739 Phase 1 179 183 654 37.0 127.43751 0.34679 10819 5305060007 BILOE NUSA TENGGARA TIMUR 1 302 Phase 1 329 231 287 49.9 124.80942 -9.29323 10820 5315030017 NGANCAR NUSA TENGGARA TIMUR 1 196 Phase 1 340 288 660 62.3 120.26442 -8.70941 10821 5309062007 NUBALEMA NUSA TENGGARA TIMUR 79 Phase 1 18 15 282 3.3 123.16791 -8.30566 10822 8104020008 JIKUMERASA MALUKU 543 Phase 1 121 124 146 23.5 127.02386 -3.16619 10823 5317050007 KABALI DANA NUSA TENGGARA TIMUR 374 Phase 1 71 49 913 10.8 119.24046 -9.53622 10824 8204070017 SANGAPATI MALUKU UTARA 1 103 Phase 1 234 240 084 48.4 127.44028 0.34016 10825 5304071006 OELEU NUSA TENGGARA TIMUR 382 Phase 1 109 76 627 16.5 124.51867 -9.96732 10826 5315030017 NGANCAR NUSA TENGGARA TIMUR 316 Phase 1 90 76 410 16.5 120.27415 -8.70708 10827 5309062012 OE SAYANG NUSA TENGGARA TIMUR 690 Phase 1 157 133 293 28.8 123.17110 -8.29653 10828 8106021003 LUHU MALUKU 748 Phase 1 123 126 198 23.9 127.92721 -3.40398 10829 5317050007 KABALI DANA NUSA TENGGARA TIMUR 546 Phase 1 103 72 409 15.6 119.22913 -9.52765 10830 8204070008 SAMSUMA MALUKU UTARA 956 Phase 1 310 318 060 64.1 127.43877 0.31375 10831 5304071006 OELEU NUSA TENGGARA TIMUR 345 Phase 1 99 69 597 15.0 124.52831 -9.96479 10832 5315030018 PONTO ARA NUSA TENGGARA TIMUR 349 Phase 1 83 70 467 15.2 120.28101 -8.70114 10833 5309062007 NUBALEMA NUSA TENGGARA TIMUR 192 Phase 1 43 36 507 7.9 123.15953 -8.30914 10834 8106021003 LUHU MALUKU 1 612 Phase 1 265 271 890 51.4 127.92360 -3.41264 10835 5317050007 KABALI DANA NUSA TENGGARA TIMUR 1 122 Phase 1 212 149 036 32.2 119.22563 -9.52558 10836 8204070007 PLOILI MALUKU UTARA 517 Phase 1 140 143 640 28.9 127.43224 0.30685 10837 5304071005 BABUIN NUSA TENGGARA TIMUR 129 Phase 1 40 28 120 6.1 124.52416 -9.95649 10838 5315030018 PONTO ARA NUSA TENGGARA TIMUR 860 Phase 1 204 173 196 37.4 120.28511 -8.70489 10839 5309062007 NUBALEMA NUSA TENGGARA TIMUR 21 Phase 1 5 4 245 0.9 123.15803 -8.31148 10840 8104020010 WAIMITING MALUKU 809 Phase 1 206 211 356 40.0 127.00984 -3.15415 10841 5317080002 LANGGA LERO NUSA TENGGARA TIMUR 225 Phase 1 42 29 526 6.4 119.22251 -9.42521 10842 8271011002 TAKOFI MALUKU UTARA 794 Phase 1 175 179 550 36.2 127.39904 0.43434 10843 5304071005 BABUIN NUSA TENGGARA TIMUR 237 Phase 1 72 50 616 10.9 124.52508 -9.94899 10844 5315030018 PONTO ARA NUSA TENGGARA TIMUR 68 Phase 1 17 14 433 3.1 120.29514 -8.70086 10845 5309062008 BIDARA NUSA TENGGARA TIMUR 101 Phase 1 26 22 074 4.8 123.15363 -8.30879 10846 8104020009 SAWA MALUKU 1 840 Phase 2 395 405 270 76.6 126.99101 -3.14493 10847 5317080001 WEE LONDA NUSA TENGGARA TIMUR 701 Phase 1 144 101 232 21.8 119.20699 -9.40884 10848 8271011001 FIGUR MALUKU UTARA 115 Phase 1 25 25 650 5.2 127.39214 0.44006 10849 5304071005 BABUIN NUSA TENGGARA TIMUR 215 Phase 1 66 46 398 10.0 124.52540 -9.94583 Annex II – Demand forecast results Page 10 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 10850 5315030018 PONTO ARA NUSA TENGGARA TIMUR 44 Phase 1 11 9 339 2.0 120.29562 -8.69618 10851 5309062003 LEWOBELE NUSA TENGGARA TIMUR 173 Phase 1 39 33 111 7.1 123.14978 -8.30661 10852 8107010035 KULUGOWA MALUKU 639 Phase 2 302 309 852 58.6 131.41565 -3.95472 10853 5317050014 KADI PADA NUSA TENGGARA TIMUR 1 861 Phase 1 460 323 380 69.8 119.19460 -9.39919 10854 8271011001 FIGUR MALUKU UTARA 493 Phase 1 108 110 808 22.3 127.38674 0.44505 10855 5304071005 BABUIN NUSA TENGGARA TIMUR 192 Phase 1 59 41 477 8.9 124.52542 -9.94317 10856 5315030019 WAE BANGKA NUSA TENGGARA TIMUR 190 Phase 1 44 37 356 8.1 120.29751 -8.68987 10857 5309062003 LEWOBELE NUSA TENGGARA TIMUR 126 Phase 1 29 24 621 5.3 123.14955 -8.30404 10858 8106010012 BUANO UTARA MALUKU 831 Phase 2 210 215 460 40.7 127.92028 -2.91279 10859 5317080005 RADAMATA NUSA TENGGARA TIMUR 1 766 Phase 1 346 243 238 52.5 119.22142 -9.39260 10860 8271011006 TAFAMUTU MALUKU UTARA 922 Phase 1 197 202 122 40.7 127.38613 0.46528 10861 5304071005 BABUIN NUSA TENGGARA TIMUR 235 Phase 1 72 50 616 10.9 124.51828 -9.94613 10862 5315030019 WAE BANGKA NUSA TENGGARA TIMUR 177 Phase 1 41 34 809 7.5 120.29582 -8.68889 10863 5309062008 BIDARA NUSA TENGGARA TIMUR 4 Phase 1 1 849 0.2 123.15008 -8.30396 10864 8106021003 LUHU MALUKU 553 Phase 2 91 93 366 17.7 127.91864 -3.42992 10865 5317030006 KORI NUSA TENGGARA TIMUR 967 Phase 1 188 132 164 28.5 119.02184 -9.50290 10866 8204070006 DAURI MALUKU UTARA 643 Phase 1 147 150 822 30.4 127.41840 0.28339 10867 5304071005 BABUIN NUSA TENGGARA TIMUR 495 Phase 1 150 105 450 22.8 124.51393 -9.94810 10868 5315030019 WAE BANGKA NUSA TENGGARA TIMUR 415 Phase 1 94 79 806 17.2 120.29473 -8.68043 10869 5309062008 BIDARA NUSA TENGGARA TIMUR 35 Phase 1 9 7 641 1.6 123.14996 -8.30046 10870 8106021003 LUHU MALUKU 1 688 Phase 2 277 284 202 53.7 127.91593 -3.44197 10871 5301050012 UBU RAYA NUSA TENGGARA TIMUR 1 444 Phase 1 281 197 543 42.6 119.41596 -9.58480 10872 8204070005 GURUA MALUKU UTARA 688 Phase 1 217 222 642 44.9 127.40975 0.27955 10873 5304071005 BABUIN NUSA TENGGARA TIMUR 234 Phase 1 71 49 913 10.8 124.51119 -9.94323 10874 5315030019 WAE BANGKA NUSA TENGGARA TIMUR 213 Phase 1 49 41 601 9.0 120.30255 -8.68110 10875 5309062003 LEWOBELE NUSA TENGGARA TIMUR 139 Phase 1 32 27 168 5.9 123.14780 -8.29734 10876 8104020009 SAWA MALUKU 116 Phase 2 25 25 650 4.9 126.98165 -3.16061 10877 5317080011 LETE KONDA NUSA TENGGARA TIMUR 305 Phase 1 25 17 575 3.8 119.31353 -9.42976 10878 8204070012 WAIGITANG MALUKU UTARA 523 Phase 1 135 138 510 27.9 127.39126 0.36804 10879 5304070012 TAEBESA NUSA TENGGARA TIMUR 915 Phase 1 249 175 047 37.8 124.48968 -9.95365 10880 5315030019 WAE BANGKA NUSA TENGGARA TIMUR 1 729 Phase 1 392 332 808 71.8 120.31165 -8.67953 10881 5309062003 LEWOBELE NUSA TENGGARA TIMUR 363 Phase 1 82 69 618 15.0 123.14644 -8.29640 10882 8104020011 WAEPERANG MALUKU 1 766 Phase 2 508 521 208 98.6 126.95581 -3.14135 10883 5317080008 KARUNI NUSA TENGGARA TIMUR 153 Phase 1 50 35 150 7.6 119.31001 -9.43782 10884 8204070012 WAIGITANG MALUKU UTARA 136 Phase 1 36 36 936 7.4 127.37723 0.36309 10885 5304071011 OFU NUSA TENGGARA TIMUR 1 693 Phase 1 438 307 914 66.4 124.48953 -9.95475 10886 5313122001 URANG NUSA TENGGARA TIMUR 1 139 Phase 1 237 201 213 43.4 120.30334 -8.67111 10887 5309062009 WEWIT NUSA TENGGARA TIMUR 972 Phase 1 186 157 914 34.1 123.15518 -8.28459 10888 8106021003 LUHU MALUKU 1 327 Phase 2 218 223 668 42.3 127.91391 -3.44870 10889 5317080008 KARUNI NUSA TENGGARA TIMUR 398 Phase 1 74 52 022 11.2 119.30604 -9.43928 10890 8204071004 SEBELEI MALUKU UTARA 884 Phase 1 302 309 852 62.4 127.36666 0.35665 10891 5304071010 HAUNOBENAK NUSA TENGGARA TIMUR 592 Phase 1 182 127 946 27.6 124.53543 -9.95751 10892 5315040015 KASONG NUSA TENGGARA TIMUR 218 Phase 1 48 40 752 8.8 120.32909 -8.53843 10893 5309062008 BIDARA NUSA TENGGARA TIMUR 103 Phase 1 26 22 074 4.8 123.15458 -8.30221 10894 8103060015 UPT TONETANAH MALUKU 520 Phase 2 100 102 600 19.4 129.00278 -3.19467 10895 5317080008 KARUNI NUSA TENGGARA TIMUR 608 Phase 1 198 139 194 30.0 119.30726 -9.44136 10896 8204071005 TALAPAO MALUKU UTARA 575 Phase 1 151 154 926 31.2 127.34851 0.33767 10897 5304071006 OELEU NUSA TENGGARA TIMUR 396 Phase 1 113 79 439 17.1 124.53905 -9.96549 10898 5315040015 KASONG NUSA TENGGARA TIMUR 75 Phase 1 17 14 433 3.1 120.32632 -8.53645 10899 5309062008 BIDARA NUSA TENGGARA TIMUR 254 Phase 1 64 54 336 11.7 123.15681 -8.30147 10900 8106021003 LUHU MALUKU 2 212 Phase 2 363 372 438 70.4 127.92471 -3.30383 10901 5317080008 KARUNI NUSA TENGGARA TIMUR 319 Phase 1 104 73 112 15.8 119.30855 -9.44281 10902 8204071006 MATEKETEN MALUKU UTARA 442 Phase 1 111 113 886 22.9 127.34568 0.33185 10903 5304071006 OELEU NUSA TENGGARA TIMUR 358 Phase 1 102 71 706 15.5 124.54614 -9.96397 10904 5315040015 KASONG NUSA TENGGARA TIMUR 53 Phase 1 12 10 188 2.2 120.32549 -8.53707 10905 5309062002 BAYA NUSA TENGGARA TIMUR 228 Phase 1 58 49 242 10.6 123.14218 -8.30591 10906 8106010012 BUANO UTARA MALUKU 785 Phase 2 199 204 174 38.6 127.89056 -2.94287 10907 5317080008 KARUNI NUSA TENGGARA TIMUR 343 Phase 1 112 78 736 17.0 119.31894 -9.46042 10908 8204071007 TEGONO MALUKU UTARA 259 Phase 1 76 77 976 15.7 127.34707 0.31982 10909 5304071006 OELEU NUSA TENGGARA TIMUR 626 Phase 1 179 125 837 27.2 124.54420 -9.97079 10910 5315040015 KASONG NUSA TENGGARA TIMUR 228 Phase 1 51 43 299 9.3 120.32404 -8.53561 10911 5309062002 BAYA NUSA TENGGARA TIMUR 148 Phase 1 38 32 262 7.0 123.14227 -8.31211 10912 8104020004 NAMLEA MALUKU 223 Phase 2 43 44 118 8.3 127.09152 -3.27117 10913 5317080009 TOTOK NUSA TENGGARA TIMUR 252 Phase 1 55 38 665 8.3 119.31777 -9.47123 10914 8204071001 OMBAWA MALUKU UTARA 98 Phase 1 26 26 676 5.4 127.34786 0.31662 10915 5304041001 OEBOBO NUSA TENGGARA TIMUR 472 Phase 1 122 85 766 18.5 124.16312 -9.98214 10916 5315040015 KASONG NUSA TENGGARA TIMUR 199 Phase 1 44 37 356 8.1 120.32183 -8.53428 10917 5309062002 BAYA NUSA TENGGARA TIMUR 115 Phase 1 29 24 621 5.3 123.13715 -8.31012 10918 8103052004 SAHULAU MALUKU 1 265 Phase 2 273 280 098 53.0 128.80266 -3.23097 10919 5317080010 WEE MANADA NUSA TENGGARA TIMUR 623 Phase 2 623 437 969 94.5 119.32544 -9.47553 10920 8204071001 OMBAWA MALUKU UTARA 62 Phase 1 17 17 442 3.5 127.34808 0.31365 10921 5306030005 NUMPONI NUSA TENGGARA TIMUR 184 Phase 1 44 30 932 6.7 124.89462 -9.47345 10922 5315040015 KASONG NUSA TENGGARA TIMUR 105 Phase 1 24 20 376 4.4 120.33290 -8.52957 10923 5309062002 BAYA NUSA TENGGARA TIMUR 128 Phase 1 33 28 017 6.0 123.13372 -8.30309 10924 8106034007 ELPAPUTIH MALUKU 2 016 Phase 2 409 419 634 79.4 128.78131 -3.26228 10925 5317080010 WEE MANADA NUSA TENGGARA TIMUR 310 Phase 2 310 217 930 47.0 119.33706 -9.48239 10926 8204071002 BOBAWAE MALUKU UTARA 545 Phase 1 136 139 536 28.1 127.34907 0.31158 10927 5306030005 NUMPONI NUSA TENGGARA TIMUR 188 Phase 1 45 31 635 6.8 124.89259 -9.47573 10928 5315040014 RAKA NUSA TENGGARA TIMUR 139 Phase 1 34 28 866 6.2 120.33358 -8.52806 10929 5309060041 WATO BAYA NUSA TENGGARA TIMUR 902 Phase 1 211 179 139 38.7 123.12868 -8.30372 10930 8106034005 SANAHU MALUKU 358 Phase 2 79 81 054 15.3 128.77777 -3.26496 10931 5317070005 WEE NAMBA NUSA TENGGARA TIMUR 1 727 Phase 2 285 200 355 43.2 119.35181 -9.48704 10932 8202030021 SIDANGA MALUKU UTARA 694 Phase 1 185 189 810 38.2 127.89136 0.35727 10933 5306030005 NUMPONI NUSA TENGGARA TIMUR 148 Phase 1 35 24 605 5.3 124.88914 -9.47456 10934 5315040014 RAKA NUSA TENGGARA TIMUR 468 Phase 1 112 95 088 20.5 120.33478 -8.52912 Annex II – Demand forecast results Page 11 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 10935 5309062001 KOKOTOBO NUSA TENGGARA TIMUR 463 Phase 1 125 106 125 22.9 123.14165 -8.32066 10936 8107010036 LALASA MALUKU 648 Phase 2 302 309 852 58.6 131.23307 -4.04222 10937 5317080010 WEE MANADA NUSA TENGGARA TIMUR 182 Phase 2 182 127 946 27.6 119.33264 -9.46708 10938 8271013004 MADO MALUKU UTARA 103 Phase 1 25 25 650 5.2 127.33053 0.89153 10939 5306022004 BABOTIN MAEMINA NUSA TENGGARA TIMUR 557 Phase 1 177 124 431 26.8 124.88496 -9.47779 10940 5315040014 RAKA NUSA TENGGARA TIMUR 313 Phase 1 75 63 675 13.7 120.33159 -8.51570 10941 5309062010 LEWOPAO NUSA TENGGARA TIMUR 71 Phase 1 24 20 376 4.4 123.14400 -8.32399 10942 8107010020 P. PANJANG MALUKU 1 913 Phase 2 391 401 166 75.9 131.22750 -4.00477 10943 5316010009 MAKATA KERI NUSA TENGGARA TIMUR 599 Phase 2 112 78 736 17.0 119.55910 -9.60571 10944 8271013004 MADO MALUKU UTARA 93 Phase 1 22 22 572 4.5 127.32997 0.89710 10945 5306022004 BABOTIN MAEMINA NUSA TENGGARA TIMUR 120 Phase 1 39 27 417 5.9 124.88663 -9.47955 10946 5315040012 TENTANG NUSA TENGGARA TIMUR 717 Phase 1 151 128 199 27.7 120.33873 -8.50512 10947 5309062010 LEWOPAO NUSA TENGGARA TIMUR 150 Phase 1 50 42 450 9.2 123.14543 -8.32334 10948 8107010037 ARGAM MALUKU 332 Phase 2 302 309 852 58.6 131.21583 -4.00221 10949 5316011005 MALINJAK NUSA TENGGARA TIMUR 865 Phase 2 122 85 766 18.5 119.56562 -9.62175 10950 8271013004 MADO MALUKU UTARA 97 Phase 1 23 23 598 4.8 127.32794 0.90105 10951 5306022005 BABOTIN NUSA TENGGARA TIMUR 58 Phase 1 19 13 357 2.9 124.87669 -9.47853 10952 5315040012 TENTANG NUSA TENGGARA TIMUR 505 Phase 1 106 89 994 19.4 120.34453 -8.50305 10953 5309062006 KENOTAN NUSA TENGGARA TIMUR 1 647 Phase 1 395 335 355 72.4 123.15105 -8.32605 10954 8171031004 WAIYAME MALUKU 592 Phase 2 108 110 808 21.0 128.16509 -3.65225 10955 5316011005 MALINJAK NUSA TENGGARA TIMUR 697 Phase 2 153 107 559 23.2 119.56575 -9.62387 10956 8271013005 FAUDU MALUKU UTARA 655 Phase 1 153 156 978 31.6 127.31436 0.90903 10957 5306022005 BABOTIN NUSA TENGGARA TIMUR 85 Phase 1 27 18 981 4.1 124.87618 -9.47443 10958 5315040012 TENTANG NUSA TENGGARA TIMUR 138 Phase 1 29 24 621 5.3 120.34629 -8.50454 10959 5309062005 LITE NUSA TENGGARA TIMUR 815 Phase 1 178 151 122 32.6 123.14990 -8.33002 10960 8171031005 RUMAH TIGA MALUKU 60 Phase 2 12 12 312 2.3 128.16564 -3.65180 10961 5301021008 WATU KARERE NUSA TENGGARA TIMUR 692 Phase 2 135 94 905 20.5 119.37570 -9.76396 10962 8271013006 TOMAJIKO MALUKU UTARA 559 Phase 1 109 111 834 22.5 127.30555 0.89830 10963 5306022005 BABOTIN NUSA TENGGARA TIMUR 80 Phase 1 26 18 278 3.9 124.87317 -9.47205 10964 5315040012 TENTANG NUSA TENGGARA TIMUR 413 Phase 1 87 73 863 15.9 120.34696 -8.50398 10965 5309062005 LITE NUSA TENGGARA TIMUR 92 Phase 1 21 17 829 3.8 123.14961 -8.33160 10966 8171031005 RUMAH TIGA MALUKU 104 Phase 2 21 21 546 4.1 128.16816 -3.64923 10967 5301021008 WATU KARERE NUSA TENGGARA TIMUR 895 Phase 2 175 123 025 26.5 119.36591 -9.76343 10968 8205040019 KUMO MALUKU UTARA 695 Phase 1 199 204 174 41.1 128.02509 1.72805 10969 5306022005 BABOTIN NUSA TENGGARA TIMUR 773 Phase 1 243 170 829 36.9 124.86990 -9.47648 10970 5315040012 TENTANG NUSA TENGGARA TIMUR 118 Phase 1 25 21 225 4.6 120.34962 -8.50816 10971 5309062005 LITE NUSA TENGGARA TIMUR 278 Phase 1 61 51 789 11.2 123.15150 -8.33198 10972 8171031005 RUMAH TIGA MALUKU 277 Phase 2 56 57 456 10.9 128.17073 -3.64638 10973 5317040008 WERI LOLO NUSA TENGGARA TIMUR 988 Phase 2 215 151 145 32.6 119.14317 -9.55694 10974 8204062002 POSI POSI MALUKU UTARA 961 Phase 1 230 235 980 47.5 127.43593 -0.06992 10975 5306010010 RABASAHAIN NUSA TENGGARA TIMUR 83 Phase 1 23 16 169 3.5 124.90787 -9.66683 10976 5315040012 TENTANG NUSA TENGGARA TIMUR 1 185 Phase 1 249 211 401 45.6 120.35248 -8.51280 10977 5309062010 LEWOPAO NUSA TENGGARA TIMUR 101 Phase 1 34 28 866 6.2 123.14791 -8.31934 10978 8171031005 RUMAH TIGA MALUKU 318 Phase 2 64 65 664 12.4 128.17463 -3.64196 10979 5317040008 WERI LOLO NUSA TENGGARA TIMUR 446 Phase 2 97 68 191 14.7 119.12822 -9.54842 10980 8205032001 KATANA MALUKU UTARA 114 Phase 1 27 27 702 5.6 128.02409 1.55123 10981 5306010010 RABASAHAIN NUSA TENGGARA TIMUR 234 Phase 1 65 45 695 9.9 124.91173 -9.66617 10982 5315040012 TENTANG NUSA TENGGARA TIMUR 330 Phase 1 70 59 430 12.8 120.35548 -8.50580 10983 5309062010 LEWOPAO NUSA TENGGARA TIMUR 156 Phase 1 52 44 148 9.5 123.14975 -8.31659 10984 8171031005 RUMAH TIGA MALUKU 41 Phase 2 9 9 234 1.7 128.17568 -3.64080 10985 5317040008 WERI LOLO NUSA TENGGARA TIMUR 1 023 Phase 2 222 156 066 33.7 119.12615 -9.55176 10986 8205032001 KATANA MALUKU UTARA 806 Phase 1 189 193 914 39.1 128.02377 1.54935 10987 5306010010 RABASAHAIN NUSA TENGGARA TIMUR 300 Phase 1 83 58 349 12.6 124.91849 -9.66825 10988 5315040012 TENTANG NUSA TENGGARA TIMUR 101 Phase 1 22 18 678 4.0 120.36332 -8.50489 10989 5309062004 HOROWURA NUSA TENGGARA TIMUR 128 Phase 1 32 27 168 5.9 123.14776 -8.33992 10990 8171031005 RUMAH TIGA MALUKU 543 Phase 2 109 111 834 21.1 128.17249 -3.63603 10991 5301021008 WATU KARERE NUSA TENGGARA TIMUR 273 Phase 2 54 37 962 8.2 119.36532 -9.75140 10992 8205010029 BALISOSANG MALUKU UTARA 365 Phase 1 64 65 664 13.2 127.80748 1.12032 10993 5306010011 UMATOOS NUSA TENGGARA TIMUR 718 Phase 1 210 147 630 31.9 124.92340 -9.66023 10994 5315040012 TENTANG NUSA TENGGARA TIMUR 563 Phase 1 119 101 031 21.8 120.36547 -8.50522 10995 5309062004 HOROWURA NUSA TENGGARA TIMUR 141 Phase 1 35 29 715 6.4 123.15048 -8.34333 10996 8109020010 KASE MALUKU 305 Phase 2 105 107 730 20.4 126.56494 -3.79273 10997 5301021007 LABOYA BAWA NUSA TENGGARA TIMUR 1 747 Phase 2 292 205 276 44.3 119.34980 -9.73497 10998 8205010009 TAHANE MALUKU UTARA 926 Phase 1 223 228 798 46.1 127.82122 1.14314 10999 5304100002 KOKOI NUSA TENGGARA TIMUR 382 Phase 1 97 68 191 14.7 124.61174 -9.85353 11000 5313041019 CIRENG NUSA TENGGARA TIMUR 253 Phase 1 65 55 185 11.9 120.33818 -8.65620 11001 5309062004 HOROWURA NUSA TENGGARA TIMUR 229 Phase 1 57 48 393 10.4 123.15425 -8.34340 11002 8103050011 HOLLO MALUKU 109 Phase 2 29 29 754 5.6 129.07215 -3.23413 11003 5301021009 KABU KARUDI NUSA TENGGARA TIMUR 1 923 Phase 2 303 213 009 46.0 119.36059 -9.72064 11004 8205010030 SOSOL MALUKU UTARA 838 Phase 1 211 216 486 43.6 127.82272 1.14572 11005 5304100003 FATULUNU NUSA TENGGARA TIMUR 955 Phase 1 230 161 690 34.9 124.61975 -9.85409 11006 5313041020 RUANG NUSA TENGGARA TIMUR 310 Phase 1 75 63 675 13.7 120.33088 -8.65833 11007 5309062004 HOROWURA NUSA TENGGARA TIMUR 406 Phase 1 101 85 749 18.5 123.15032 -8.35052 11008 8103050011 HOLLO MALUKU 364 Phase 2 96 98 496 18.6 129.09352 -3.24611 11009 5301021006 PATIALA BAWA NUSA TENGGARA TIMUR 859 Phase 2 224 157 472 34.0 119.33142 -9.75088 11010 8205010011 MATSA MALUKU UTARA 428 Phase 1 91 93 366 18.8 127.82077 1.14774 11011 5305022004 OELAMI NUSA TENGGARA TIMUR 113 Phase 1 30 21 090 4.6 124.45805 -9.48056 11012 5313041019 CIRENG NUSA TENGGARA TIMUR 79 Phase 1 21 17 829 3.8 120.33063 -8.65765 11013 5309062011 HOKO HOROWURA NUSA TENGGARA TIMUR 616 Phase 1 137 116 313 25.1 123.13784 -8.34480 11014 8103050011 HOLLO MALUKU 668 Phase 2 175 179 550 34.0 129.09571 -3.25305 11015 5301021006 PATIALA BAWA NUSA TENGGARA TIMUR 528 Phase 2 138 97 014 20.9 119.33016 -9.75660 11016 8204042001 TAWA BACAN TIMUR MALUKU UTARA 873 Phase 1 233 239 058 48.2 127.65019 -0.64263 11017 5305022004 OELAMI NUSA TENGGARA TIMUR 91 Phase 1 24 16 872 3.6 124.45103 -9.47798 11018 5313041020 RUANG NUSA TENGGARA TIMUR 333 Phase 1 80 67 920 14.7 120.33001 -8.66198 11019 5310020001 KOLIDETUNG NUSA TENGGARA TIMUR 330 Phase 1 93 78 957 17.0 122.14009 -8.72858 Annex II – Demand forecast results Page 12 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 11020 8103050025 NUA NEA MALUKU 569 Phase 2 116 119 016 22.5 129.09064 -3.25633 11021 5301023004 HARONA KALA NUSA TENGGARA TIMUR 1 416 Phase 2 243 170 829 36.9 119.31473 -9.74319 11022 8205010011 MATSA MALUKU UTARA 100 Phase 1 22 22 572 4.5 127.82357 1.15174 11023 5305022004 OELAMI NUSA TENGGARA TIMUR 16 Phase 1 5 3 515 0.8 124.44828 -9.47713 11024 5313041020 RUANG NUSA TENGGARA TIMUR 337 Phase 1 81 68 769 14.8 120.33006 -8.66747 11025 5308030013 NAPASABOK NUSA TENGGARA TIMUR 335 Phase 1 66 56 034 12.1 123.50563 -8.24126 11026 8103050009 BANDA BARU MALUKU 407 Phase 2 115 117 990 22.3 129.08066 -3.22404 11027 5301021006 PATIALA BAWA NUSA TENGGARA TIMUR 650 Phase 2 170 119 510 25.8 119.32574 -9.75793 11028 8205010011 MATSA MALUKU UTARA 5 Phase 1 2 2 052 0.4 127.82558 1.14988 11029 5305022004 OELAMI NUSA TENGGARA TIMUR 797 Phase 1 208 146 224 31.6 124.44918 -9.47553 11030 5313041019 CIRENG NUSA TENGGARA TIMUR 689 Phase 1 177 150 273 32.4 120.32884 -8.67521 11031 5308031008 LAMAGUTE NUSA TENGGARA TIMUR 161 Phase 1 49 41 601 9.0 123.51789 -8.23880 11032 8109030006 LEKU MALUKU 19 Phase 2 6 6 156 1.2 126.80967 -3.80376 11033 5302060012 KAWANGU NUSA TENGGARA TIMUR 498 Phase 2 112 78 736 17.0 120.33228 -9.68604 11034 8205010030 SOSOL MALUKU UTARA 11 Phase 1 3 3 078 0.6 127.82572 1.14982 11035 5305022005 KIUSILI NUSA TENGGARA TIMUR 28 Phase 1 8 5 624 1.2 124.44791 -9.47719 11036 5313123012 WAE MANTANG NUSA TENGGARA TIMUR 947 Phase 1 205 174 045 37.6 120.40635 -8.48854 11037 5308031007 WAIMATAN NUSA TENGGARA TIMUR 329 Phase 1 90 76 410 16.5 123.51910 -8.24012 11038 8109030006 LEKU MALUKU 422 Phase 2 118 121 068 22.9 126.81153 -3.80376 11039 5302060005 KAMBATA TANA NUSA TENGGARA TIMUR 1 086 Phase 2 251 176 453 38.1 120.32320 -9.70535 11040 8205010014 SAMSUMA MALUKU UTARA 661 Phase 1 168 172 368 34.7 127.82675 1.15095 11041 5306010034 OAN MANE NUSA TENGGARA TIMUR 147 Phase 1 47 33 041 7.1 124.94403 -9.62551 11042 5315040014 RAKA NUSA TENGGARA TIMUR 380 Phase 1 91 77 259 16.7 120.34237 -8.52814 11043 5308031007 WAIMATAN NUSA TENGGARA TIMUR 70 Phase 1 20 16 980 3.7 123.51984 -8.23828 11044 8109030006 LEKU MALUKU 322 Phase 2 90 92 340 17.5 126.82087 -3.80015 11045 5302060005 KAMBATA TANA NUSA TENGGARA TIMUR 329 Phase 2 77 54 131 11.7 120.32608 -9.70956 11046 8272041001 SELA MALOFO MALUKU UTARA 535 Phase 1 111 113 886 22.9 127.74158 0.15337 11047 5305020039 KAENBAUN NUSA TENGGARA TIMUR 460 Phase 1 135 94 905 20.5 124.47668 -9.37375 11048 5318060021 MARAPOKOT NUSA TENGGARA TIMUR 84 Phase 1 19 16 131 3.5 121.30865 -8.53370 11049 5308031006 AULESA NUSA TENGGARA TIMUR 566 Phase 1 181 153 669 33.2 123.53098 -8.23890 11050 8109030008 OKI BARU MALUKU 75 Phase 2 16 16 416 3.1 126.82777 -3.79793 11051 5301050007 TANA RARA NUSA TENGGARA TIMUR 184 Phase 2 6 4 218 0.9 119.45465 -9.53565 11052 8201132011 TOLISAOR MALUKU UTARA 415 Phase 1 100 102 600 20.7 127.67177 1.52547 11053 5304091004 HOIBETI NUSA TENGGARA TIMUR 106 Phase 1 29 20 387 4.4 124.58976 -9.96665 11054 5318060021 MARAPOKOT NUSA TENGGARA TIMUR 109 Phase 1 24 20 376 4.4 121.31161 -8.52990 11055 5308031005 LAMAAU NUSA TENGGARA TIMUR 275 Phase 1 78 66 222 14.3 123.53403 -8.23975 11056 8109030008 OKI BARU MALUKU 1 038 Phase 2 220 225 720 42.7 126.84105 -3.79172 11057 5301072010 BONDO TERA NUSA TENGGARA TIMUR 881 Phase 2 107 75 221 16.2 119.44701 -9.53743 11058 8201132012 PASALULU MALUKU UTARA 943 Phase 1 256 262 656 52.9 127.67366 1.52566 11059 5304091006 PANITE NUSA TENGGARA TIMUR 703 Phase 1 227 159 581 34.4 124.58477 -9.95770 11060 5318060021 MARAPOKOT NUSA TENGGARA TIMUR 47 Phase 1 11 9 339 2.0 121.31913 -8.52048 11061 5310040010 NANGAHALE NUSA TENGGARA TIMUR 256 Phase 1 62 52 638 11.4 122.52336 -8.55639 11062 8109030007 OKI LAMA MALUKU 1 326 Phase 2 298 305 748 57.8 126.85993 -3.78588 11063 5301072010 BONDO TERA NUSA TENGGARA TIMUR 482 Phase 2 85 59 755 12.9 119.43722 -9.53778 11064 8205010013 NGOFAKIAHA MALUKU UTARA 319 Phase 1 67 68 742 13.8 127.82978 1.15284 11065 5304100013 FENUN NUSA TENGGARA TIMUR 487 Phase 1 126 88 578 19.1 124.62688 -9.85253 11066 5318060021 MARAPOKOT NUSA TENGGARA TIMUR 1 143 Phase 1 248 210 552 45.4 121.32124 -8.51955 11067 5310040010 NANGAHALE NUSA TENGGARA TIMUR 219 Phase 1 53 44 997 9.7 122.52529 -8.55777 11068 8109040001 POHON BATU MALUKU 1 527 Phase 2 292 299 592 56.7 126.90152 -3.78034 11069 5301072008 KAREKA NDUKU NUSA TENGGARA TIMUR 910 Phase 2 159 111 777 24.1 119.42874 -9.53339 11070 8205010015 NGOFAGITA MALUKU UTARA 365 Phase 1 78 80 028 16.1 127.83082 1.15048 11071 5314020003 LIDOR NUSA TENGGARA TIMUR 1 781 Phase 1 385 270 655 58.4 122.91900 -10.83867 11072 5318060021 MARAPOKOT NUSA TENGGARA TIMUR 51 Phase 1 12 10 188 2.2 121.32438 -8.52443 11073 5310042025 TUA BAO NUSA TENGGARA TIMUR 555 Phase 1 130 110 370 23.8 122.53633 -8.56113 11074 5301072008 KAREKA NDUKU NUSA TENGGARA TIMUR 1 060 Phase 2 185 130 055 28.1 119.42944 -9.52514 11075 8204062001 SAGAWELE MALUKU UTARA 841 Phase 1 242 248 292 50.0 127.40988 -0.09332 11076 8109040002 WAMSISI MALUKU 2 155 Phase 2 435 446 310 84.4 126.91733 -3.77504 11077 5304070013 NAKFUNU NUSA TENGGARA TIMUR 719 Phase 1 224 157 472 34.0 124.50221 -9.91862 11078 5318060021 MARAPOKOT NUSA TENGGARA TIMUR 4 Phase 1 1 849 0.2 121.32872 -8.53126 11079 5308060007 NORMAL NUSA TENGGARA TIMUR 13 Phase 1 5 4 245 0.9 123.75847 -8.18349 11080 5301072008 KAREKA NDUKU NUSA TENGGARA TIMUR 610 Phase 2 106 74 518 16.1 119.42492 -9.52224 11081 8205010013 NGOFAKIAHA MALUKU UTARA 101 Phase 1 22 22 572 4.5 127.83220 1.15374 11082 8107040001 WARU MALUKU 1 020 Phase 2 409 419 634 79.4 130.77894 -3.43567 11083 5304090010 BOTI NUSA TENGGARA TIMUR 466 Phase 1 120 84 360 18.2 124.52880 -9.90606 11084 5318060022 NANGADHERO NUSA TENGGARA TIMUR 580 Phase 1 130 110 370 23.8 121.32888 -8.53181 11085 5308060007 NORMAL NUSA TENGGARA TIMUR 74 Phase 1 25 21 225 4.6 123.75655 -8.18434 11086 5317030011 BUKAMBERO NUSA TENGGARA TIMUR 279 Phase 2 56 39 368 8.5 119.09848 -9.46776 11087 8205010015 NGOFAGITA MALUKU UTARA 79 Phase 1 17 17 442 3.5 127.83319 1.15182 11088 8107040001 WARU MALUKU 336 Phase 2 135 138 510 26.2 130.79019 -3.42458 11089 5304090010 BOTI NUSA TENGGARA TIMUR 376 Phase 1 97 68 191 14.7 124.53117 -9.90594 11090 5318060022 NANGADHERO NUSA TENGGARA TIMUR 892 Phase 1 199 168 951 36.5 121.32935 -8.53289 11091 5308060007 NORMAL NUSA TENGGARA TIMUR 94 Phase 1 31 26 319 5.7 123.75499 -8.18555 11092 5317030011 BUKAMBERO NUSA TENGGARA TIMUR 233 Phase 2 47 33 041 7.1 119.11240 -9.48549 11093 8205010016 PELERI MALUKU UTARA 654 Phase 1 190 194 940 39.3 127.83508 1.15283 11094 8104023001 ILATH MALUKU 2 124 Phase 2 454 465 804 88.1 127.23963 -3.62036 11095 5304090010 BOTI NUSA TENGGARA TIMUR 1 346 Phase 1 346 243 238 52.5 124.53062 -9.90075 11096 5315040011 PONG NARANG NUSA TENGGARA TIMUR 516 Phase 1 108 91 692 19.8 120.34532 -8.49510 11097 5308060007 NORMAL NUSA TENGGARA TIMUR 172 Phase 1 57 48 393 10.4 123.75481 -8.18836 11098 5317030005 WAI HOLO NUSA TENGGARA TIMUR 2 774 Phase 2 547 384 541 83.0 119.09755 -9.51382 11099 8204071003 MALAPAT MALUKU UTARA 605 Phase 1 176 180 576 36.4 127.36805 0.29342 11100 8104021019 SAVANAJAYA MALUKU 151 Phase 2 39 40 014 7.6 126.99700 -3.31975 11101 5314041001 INAOE NUSA TENGGARA TIMUR 705 Phase 1 185 130 055 28.1 123.18199 -10.81939 11102 5315040013 MOMOL NUSA TENGGARA TIMUR 679 Phase 1 216 183 384 39.6 120.31928 -8.52057 11103 5309070015 LAMATEWELU NUSA TENGGARA TIMUR 105 Phase 1 33 28 017 6.0 123.22801 -8.36117 11104 5317030005 WAI HOLO NUSA TENGGARA TIMUR 803 Phase 2 159 111 777 24.1 119.09767 -9.51525 Annex II – Demand forecast results Page 13 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 11105 8272020008 MAITARA MALUKU UTARA 425 Phase 1 107 109 782 22.1 127.36727 0.74039 11106 8104021020 WAETELE MALUKU 9 Phase 2 3 3 078 0.6 126.97690 -3.33250 11107 5304100013 FENUN NUSA TENGGARA TIMUR 15 Phase 1 4 2 812 0.6 124.62494 -9.84811 11108 5315030016 PONG MAJOK NUSA TENGGARA TIMUR 638 Phase 1 133 112 917 24.4 120.27653 -8.68856 11109 5309070009 NARASAOSINA NUSA TENGGARA TIMUR 104 Phase 1 26 22 074 4.8 123.17206 -8.36587 11110 8205010019 MALAPA MALUKU UTARA 198 Phase 1 54 55 404 11.2 127.83297 1.15515 11111 8104021020 WAETELE MALUKU 324 Phase 2 86 88 236 16.7 126.97155 -3.33265 11112 5317010001 KAHALE NUSA TENGGARA TIMUR 3 723 Phase 2 631 443 593 95.7 119.12039 -9.69172 11113 5304100033 NETUTNANA NUSA TENGGARA TIMUR 1 025 Phase 1 292 205 276 44.3 124.61532 -9.83993 11114 5315030016 PONG MAJOK NUSA TENGGARA TIMUR 223 Phase 1 47 39 903 8.6 120.27785 -8.68633 11115 5309070009 NARASAOSINA NUSA TENGGARA TIMUR 471 Phase 1 116 98 484 21.2 123.17178 -8.35742 11116 8205010021 NGOFABOBAWA MALUKU UTARA 331 Phase 1 88 90 288 18.2 127.83187 1.15690 11117 8104021020 WAETELE MALUKU 12 Phase 2 4 4 104 0.8 126.97489 -3.34644 11118 5317020010 MALI IHA NUSA TENGGARA TIMUR 1 211 Phase 2 180 126 540 27.3 119.03283 -9.56456 11119 5303100010 HANSISI NUSA TENGGARA TIMUR 557 Phase 1 138 97 014 20.9 123.48053 -10.16449 11120 5313121010 COMPANG NDEHES NUSA TENGGARA TIMUR 77 Phase 1 18 15 282 3.3 120.49896 -8.55182 11121 5309070010 LEWOBUNGA NUSA TENGGARA TIMUR 1 295 Phase 1 187 158 763 34.3 123.18278 -8.35342 11122 8205010024 BOBAWA MALUKU UTARA 267 Phase 1 87 89 262 18.0 127.82885 1.15690 11123 8104021018 WAEKERTA MALUKU 113 Phase 2 30 30 780 5.8 126.97167 -3.35118 11124 5301021005 WELIBO NUSA TENGGARA TIMUR 1 806 Phase 2 335 235 505 50.8 119.32833 -9.70948 11125 5320040018 RAEDEWA NUSA TENGGARA TIMUR 1 599 Phase 1 419 294 557 63.6 121.78876 -10.53118 11126 5313121010 COMPANG NDEHES NUSA TENGGARA TIMUR 121 Phase 1 27 22 923 4.9 120.49758 -8.55365 11127 5308031005 LAMAAU NUSA TENGGARA TIMUR 57 Phase 1 17 14 433 3.1 123.54138 -8.24156 11128 8205010022 SOMA MALUKU UTARA 389 Phase 1 95 97 470 19.6 127.83334 1.15903 11129 8104021018 WAEKERTA MALUKU 160 Phase 2 42 43 092 8.1 126.96682 -3.34985 11130 5301023003 PATIALA DETE NUSA TENGGARA TIMUR 1 576 Phase 2 337 236 911 51.1 119.29813 -9.70877 11131 5304090007 TESI AYOFANU NUSA TENGGARA TIMUR 32 Phase 1 9 6 327 1.4 124.59604 -9.88779 11132 5313121010 COMPANG NDEHES NUSA TENGGARA TIMUR 277 Phase 1 62 52 638 11.4 120.50161 -8.55154 11133 5308031009 BAO LALI DULI NUSA TENGGARA TIMUR 175 Phase 1 50 42 450 9.2 123.54238 -8.24271 11134 8205010023 TAGONO MALUKU UTARA 306 Phase 1 79 81 054 16.3 127.83141 1.15953 11135 8104021018 WAEKERTA MALUKU 884 Phase 2 228 233 928 44.2 126.95602 -3.34526 11136 5301023002 GAURA NUSA TENGGARA TIMUR 2 290 Phase 2 462 324 786 70.1 119.26154 -9.71511 11137 5304090007 TESI AYOFANU NUSA TENGGARA TIMUR 285 Phase 1 78 54 834 11.8 124.59772 -9.88939 11138 5313121009 GOLO CADOR NUSA TENGGARA TIMUR 417 Phase 1 90 76 410 16.5 120.50863 -8.55957 11139 5308031004 LAMATOKAN NUSA TENGGARA TIMUR 105 Phase 1 29 24 621 5.3 123.54967 -8.25096 11140 8205010024 BOBAWA MALUKU UTARA 187 Phase 1 61 62 586 12.6 127.82954 1.16015 11141 8104021018 WAEKERTA MALUKU 71 Phase 2 19 19 494 3.7 126.95455 -3.34752 11142 5301050009 LODA PARE NUSA TENGGARA TIMUR 1 574 Phase 2 190 133 570 28.8 119.38638 -9.65760 11143 5304100013 FENUN NUSA TENGGARA TIMUR 234 Phase 1 61 42 883 9.3 124.62619 -9.84724 11144 5313121009 GOLO CADOR NUSA TENGGARA TIMUR 59 Phase 1 13 11 037 2.4 120.51279 -8.56036 11145 5308031004 LAMATOKAN NUSA TENGGARA TIMUR 491 Phase 1 132 112 068 24.2 123.54668 -8.25841 11146 8205010026 TALAPAO MALUKU UTARA 282 Phase 1 74 75 924 15.3 127.82995 1.16164 11147 8104021018 WAEKERTA MALUKU 11 Phase 2 3 3 078 0.6 126.94882 -3.34586 11148 5301021014 BODO HULA NUSA TENGGARA TIMUR 980 Phase 2 302 212 306 45.8 119.36332 -9.67293 11149 5304091004 HOIBETI NUSA TENGGARA TIMUR 320 Phase 1 88 61 864 13.3 124.58275 -9.98072 11150 5319050019 SATAR TESEM NUSA TENGGARA TIMUR 803 Phase 1 172 146 028 31.5 120.51905 -8.55531 11151 5308031004 LAMATOKAN NUSA TENGGARA TIMUR 304 Phase 1 82 69 618 15.0 123.54675 -8.26154 11152 8205010025 TAFASOHO MALUKU UTARA 234 Phase 1 55 56 430 11.4 127.82793 1.16240 11153 8104021015 KUBALAHIN MALUKU 26 Phase 2 11 11 286 2.1 126.93577 -3.35985 11154 5301021010 LABOYA DETE NUSA TENGGARA TIMUR 1 792 Phase 2 323 227 069 49.0 119.33514 -9.67588 11155 5304071004 OETUKE NUSA TENGGARA TIMUR 1 296 Phase 1 339 238 317 51.4 124.57404 -9.99842 11156 5319050019 SATAR TESEM NUSA TENGGARA TIMUR 542 Phase 1 116 98 484 21.2 120.52509 -8.55806 11157 5310052002 MEKENDETUN NUSA TENGGARA TIMUR 107 Phase 1 29 24 621 5.3 122.26338 -8.69911 11158 8205010027 SABALE MALUKU UTARA 164 Phase 1 48 49 248 9.9 127.82925 1.16596 11159 8104021015 KUBALAHIN MALUKU 117 Phase 2 46 47 196 8.9 126.93691 -3.36218 11160 5301021011 SODANA NUSA TENGGARA TIMUR 1 621 Phase 2 301 211 603 45.7 119.38127 -9.69256 11161 5304100013 FENUN NUSA TENGGARA TIMUR 688 Phase 1 178 125 134 27.0 124.63032 -9.83918 11162 5319050019 SATAR TESEM NUSA TENGGARA TIMUR 203 Phase 1 44 37 356 8.1 120.53398 -8.56084 11163 5310032013 NATAKOLI NUSA TENGGARA TIMUR 494 Phase 1 112 95 088 20.5 122.42391 -8.71737 11164 8205010034 TERPADU MALUKU UTARA 165 Phase 1 41 42 066 8.5 127.83362 1.16233 11165 8104021015 KUBALAHIN MALUKU 20 Phase 2 8 8 208 1.6 126.94218 -3.36805 11166 5317040008 WERI LOLO NUSA TENGGARA TIMUR 575 Phase 2 125 87 875 19.0 119.14494 -9.57308 11167 5304100013 FENUN NUSA TENGGARA TIMUR 587 Phase 1 152 106 856 23.1 124.63729 -9.84157 11168 5319050018 BEA WAEK NUSA TENGGARA TIMUR 92 Phase 1 19 16 131 3.5 120.53551 -8.55535 11169 5310032013 NATAKOLI NUSA TENGGARA TIMUR 330 Phase 1 75 63 675 13.7 122.43163 -8.71719 11170 8205022010 GULO MALUKU UTARA 766 Phase 1 196 201 096 40.5 128.00895 1.42450 11171 8104021015 KUBALAHIN MALUKU 23 Phase 2 9 9 234 1.7 126.94221 -3.36978 11172 5317040001 BURU KAGHU NUSA TENGGARA TIMUR 160 Phase 2 30 21 090 4.6 119.12061 -9.59161 11173 5304100012 KUALEU NUSA TENGGARA TIMUR 685 Phase 1 171 120 213 25.9 124.64012 -9.84179 11174 5319050018 BEA WAEK NUSA TENGGARA TIMUR 189 Phase 1 39 33 111 7.1 120.53574 -8.54976 11175 5310032013 NATAKOLI NUSA TENGGARA TIMUR 391 Phase 1 89 75 561 16.3 122.43711 -8.72208 11176 8205022009 TUNUO MALUKU UTARA 847 Phase 1 232 238 032 48.0 128.01871 1.41286 11177 8104021015 KUBALAHIN MALUKU 40 Phase 2 16 16 416 3.1 126.94256 -3.37171 11178 5317040001 BURU KAGHU NUSA TENGGARA TIMUR 1 323 Phase 2 243 170 829 36.9 119.11874 -9.59942 11179 5320040012 ROBOABA NUSA TENGGARA TIMUR 891 Phase 1 230 161 690 34.9 121.87439 -10.47848 11180 5319050018 BEA WAEK NUSA TENGGARA TIMUR 115 Phase 1 24 20 376 4.4 120.53244 -8.55039 11181 5310032014 HEBING NUSA TENGGARA TIMUR 49 Phase 1 14 11 886 2.6 122.44414 -8.72211 11182 8204063004 MODAYAMA MALUKU UTARA 648 Phase 1 110 112 860 22.7 127.43039 0.12880 11183 8104021015 KUBALAHIN MALUKU 31 Phase 2 12 12 312 2.3 126.94221 -3.37355 11184 5317040001 BURU KAGHU NUSA TENGGARA TIMUR 814 Phase 2 150 105 450 22.8 119.11790 -9.60681 11185 5320040010 MENIA NUSA TENGGARA TIMUR 2 145 Phase 1 510 358 530 77.4 121.88168 -10.44240 11186 5319050018 BEA WAEK NUSA TENGGARA TIMUR 142 Phase 1 29 24 621 5.3 120.53071 -8.54469 11187 5310032014 HEBING NUSA TENGGARA TIMUR 93 Phase 1 27 22 923 4.9 122.44524 -8.72351 11188 8204063003 LAROMABATI MALUKU UTARA 707 Phase 1 188 192 888 38.9 127.44890 0.12371 11189 8104021015 KUBALAHIN MALUKU 19 Phase 2 8 8 208 1.6 126.93952 -3.37339 Annex II – Demand forecast results Page 14 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 11190 5317010004 WAILANGIRA NUSA TENGGARA TIMUR 2 719 Phase 2 468 329 004 71.0 119.10404 -9.63314 11191 5303150002 PITAI NUSA TENGGARA TIMUR 836 Phase 1 188 132 164 28.5 123.64574 -9.99151 11192 5313130004 RADO NUSA TENGGARA TIMUR 279 Phase 1 61 51 789 11.2 120.52262 -8.53917 11193 5310032014 HEBING NUSA TENGGARA TIMUR 377 Phase 1 106 89 994 19.4 122.45838 -8.72188 11194 8205011004 AKELAMO KAO MALUKU UTARA 31 Phase 1 9 9 234 1.9 127.62387 0.89314 11195 8104021015 KUBALAHIN MALUKU 5 Phase 2 2 2 052 0.4 126.93933 -3.37170 11196 5317040001 BURU KAGHU NUSA TENGGARA TIMUR 348 Phase 2 64 44 992 9.7 119.11201 -9.59367 11197 5306010012 FAFOE NUSA TENGGARA TIMUR 117 Phase 1 30 21 090 4.6 124.93442 -9.63487 11198 5313130004 RADO NUSA TENGGARA TIMUR 184 Phase 1 41 34 809 7.5 120.52087 -8.54066 11199 5310032014 HEBING NUSA TENGGARA TIMUR 144 Phase 1 41 34 809 7.5 122.46145 -8.71336 11200 8201091006 AKEARA MALUKU UTARA 573 Phase 1 142 145 692 29.4 127.61482 0.89321 11201 8104021015 KUBALAHIN MALUKU 8 Phase 2 4 4 104 0.8 126.93416 -3.37102 11202 5317010009 MATA KAPORE NUSA TENGGARA TIMUR 1 606 Phase 2 329 231 287 49.9 119.09054 -9.58535 11203 5306010012 FAFOE NUSA TENGGARA TIMUR 297 Phase 1 74 52 022 11.2 124.93138 -9.63457 11204 5313130004 RADO NUSA TENGGARA TIMUR 96 Phase 1 21 17 829 3.8 120.52088 -8.53332 11205 5310032014 HEBING NUSA TENGGARA TIMUR 94 Phase 1 27 22 923 4.9 122.46228 -8.71166 11206 8201091006 AKEARA MALUKU UTARA 551 Phase 1 136 139 536 28.1 127.60561 0.89589 11207 8104021015 KUBALAHIN MALUKU 172 Phase 2 67 68 742 13.0 126.93342 -3.37356 11208 5317050012 MAROKOTA NUSA TENGGARA TIMUR 677 Phase 2 143 100 529 21.7 119.14795 -9.46907 11209 5306010012 FAFOE NUSA TENGGARA TIMUR 214 Phase 1 54 37 962 8.2 124.92718 -9.63622 11210 5313130004 RADO NUSA TENGGARA TIMUR 739 Phase 1 161 136 689 29.5 120.52249 -8.53283 11211 5310032014 HEBING NUSA TENGGARA TIMUR 228 Phase 1 64 54 336 11.7 122.46422 -8.71021 11212 8207030014 POSI POSI RAO MALUKU UTARA 1 103 Phase 1 305 312 930 63.0 128.18174 2.29665 11213 8104021015 KUBALAHIN MALUKU 80 Phase 2 31 31 806 6.0 126.93429 -3.37554 11214 5301072010 BONDO TERA NUSA TENGGARA TIMUR 471 Phase 2 83 58 349 12.6 119.44650 -9.52745 11215 5304102006 HOINENO NUSA TENGGARA TIMUR 174 Phase 1 42 29 526 6.4 124.68622 -9.86774 11216 5313130004 RADO NUSA TENGGARA TIMUR 112 Phase 1 25 21 225 4.6 120.51676 -8.53222 11217 5310032014 HEBING NUSA TENGGARA TIMUR 219 Phase 1 62 52 638 11.4 122.46691 -8.70900 11218 8204090019 WAIMILI MALUKU UTARA 599 Phase 1 142 145 692 29.4 127.87023 0.13024 11219 8104021016 UPT WABLOY MALUKU 143 Phase 2 38 38 988 7.4 126.93584 -3.38167 11220 5301072011 ZALA KADU NUSA TENGGARA TIMUR 1 156 Phase 2 235 165 205 35.6 119.44469 -9.51101 11221 5304102006 HOINENO NUSA TENGGARA TIMUR 162 Phase 1 39 27 417 5.9 124.68402 -9.87029 11222 5313130005 WELU NUSA TENGGARA TIMUR 340 Phase 1 84 71 316 15.4 120.51832 -8.52663 11223 5310032014 HEBING NUSA TENGGARA TIMUR 206 Phase 1 58 49 242 10.6 122.47270 -8.70724 11224 8204070004 WAILOA MALUKU UTARA 436 Phase 1 105 107 730 21.7 127.39306 0.27666 11225 8104021016 UPT WABLOY MALUKU 207 Phase 2 54 55 404 10.5 126.93205 -3.38667 11226 5301022003 PAHOLA NUSA TENGGARA TIMUR 1 182 Phase 2 237 166 611 35.9 119.42712 -9.74561 11227 5304102008 PUTUN NUSA TENGGARA TIMUR 254 Phase 1 94 66 082 14.3 124.67821 -9.86769 11228 5313130005 WELU NUSA TENGGARA TIMUR 425 Phase 1 105 89 145 19.2 120.52048 -8.52306 11229 5308010003 BABOKERONG NUSA TENGGARA TIMUR 875 Phase 1 87 73 863 15.9 123.27160 -8.49342 11230 8204033006 PANAMBUANG MALUKU UTARA 1 562 Phase 1 323 331 398 66.8 127.46409 -0.69992 11231 8104021016 UPT WABLOY MALUKU 114 Phase 2 30 30 780 5.8 126.92714 -3.38592 11232 5302031003 NGGONGI NUSA TENGGARA TIMUR 975 Phase 2 124 87 172 18.8 120.26195 -10.18119 11233 5304102007 FAT NUSA TENGGARA TIMUR 1 059 Phase 1 256 179 968 38.8 124.67720 -9.86197 11234 5313130005 WELU NUSA TENGGARA TIMUR 502 Phase 1 124 105 276 22.7 120.51366 -8.51811 11235 5310031008 KLOANGPOPOT NUSA TENGGARA TIMUR 119 Phase 1 27 22 923 4.9 122.35065 -8.72421 11236 8205041005 KALIPITU MALUKU UTARA 527 Phase 1 140 143 640 28.9 127.98587 1.69431 11237 8104021016 UPT WABLOY MALUKU 53 Phase 2 14 14 364 2.7 126.92692 -3.39070 11238 5302031003 NGGONGI NUSA TENGGARA TIMUR 915 Phase 2 221 155 363 33.5 120.26878 -10.18996 11239 5304102008 PUTUN NUSA TENGGARA TIMUR 76 Phase 1 28 19 684 4.2 124.67918 -9.87461 11240 5319050018 BEA WAEK NUSA TENGGARA TIMUR 450 Phase 1 92 78 108 16.9 120.53795 -8.53975 11241 5310031008 KLOANGPOPOT NUSA TENGGARA TIMUR 126 Phase 1 28 23 772 5.1 122.35095 -8.72547 11242 8272040008 WODA MALUKU UTARA 295 Phase 1 58 59 508 12.0 127.70548 0.41304 11243 8104021013 WAEGEREN MALUKU 671 Phase 2 166 170 316 32.2 126.92799 -3.40283 11244 5302031004 TANDULA JANGGA NUSA TENGGARA TIMUR 630 Phase 2 167 117 401 25.3 120.27799 -10.17978 11245 5304102008 PUTUN NUSA TENGGARA TIMUR 146 Phase 1 54 37 962 8.2 124.67845 -9.87569 11246 5319050017 COMPANG LAHO NUSA TENGGARA TIMUR 331 Phase 1 77 65 373 14.1 120.54399 -8.54054 11247 5310031008 KLOANGPOPOT NUSA TENGGARA TIMUR 358 Phase 1 79 67 071 14.5 122.35404 -8.72785 11248 8272040011 BALE MALUKU UTARA 787 Phase 2 189 193 914 39.1 127.70931 0.43660 11249 8104021013 WAEGEREN MALUKU 259 Phase 2 64 65 664 12.4 126.93431 -3.40747 11250 5301072011 ZALA KADU NUSA TENGGARA TIMUR 591 Phase 2 121 85 063 18.4 119.44630 -9.49871 11251 5304102008 PUTUN NUSA TENGGARA TIMUR 370 Phase 1 136 95 608 20.6 124.67451 -9.87649 11252 5319050017 COMPANG LAHO NUSA TENGGARA TIMUR 138 Phase 1 33 28 017 6.0 120.54911 -8.53480 11253 5310032017 EGON GAHAR NUSA TENGGARA TIMUR 519 Phase 1 109 92 541 20.0 122.44041 -8.70681 11254 8205011003 TETEWANG MALUKU UTARA 503 Phase 2 120 123 120 24.8 127.64917 0.89058 11255 8104021021 WANAKARTA MALUKU 1 774 Phase 2 455 466 830 88.3 126.94479 -3.39947 11256 5316040001 WEE LURI NUSA TENGGARA TIMUR 857 Phase 2 170 119 510 25.8 119.47280 -9.47796 11257 5304102008 PUTUN NUSA TENGGARA TIMUR 30 Phase 1 11 7 733 1.7 124.67245 -9.87478 11258 5319050020 LENANG NUSA TENGGARA TIMUR 45 Phase 1 11 9 339 2.0 120.55038 -8.53376 11259 5310032017 EGON GAHAR NUSA TENGGARA TIMUR 254 Phase 1 54 45 846 9.9 122.43659 -8.69778 11260 8205010020 MAILOA MALUKU UTARA 429 Phase 2 109 111 834 22.5 127.83437 1.15620 11261 8104021013 WAEGEREN MALUKU 41 Phase 2 11 11 286 2.1 126.92007 -3.40729 11262 5316040001 WEE LURI NUSA TENGGARA TIMUR 1 052 Phase 2 209 146 927 31.7 119.48682 -9.47289 11263 5304102008 PUTUN NUSA TENGGARA TIMUR 21 Phase 1 8 5 624 1.2 124.67160 -9.87434 11264 5319050020 LENANG NUSA TENGGARA TIMUR 1 065 Phase 1 239 202 911 43.8 120.54795 -8.53215 11265 5310032017 EGON GAHAR NUSA TENGGARA TIMUR 405 Phase 1 85 72 165 15.6 122.43502 -8.69169 11266 8205040021 KAKARA A MALUKU UTARA 796 Phase 2 193 198 018 39.9 128.04824 1.74845 11267 8104021013 WAEGEREN MALUKU 24 Phase 2 6 6 156 1.2 126.91854 -3.41093 11268 5316040003 OLE ATE NUSA TENGGARA TIMUR 1 288 Phase 2 251 176 453 38.1 119.49511 -9.49094 11269 5304102008 PUTUN NUSA TENGGARA TIMUR 45 Phase 1 17 11 951 2.6 124.66837 -9.87799 11270 5313130005 WELU NUSA TENGGARA TIMUR 229 Phase 1 57 48 393 10.4 120.52504 -8.51747 11271 5309070004 BILAL NUSA TENGGARA TIMUR 87 Phase 1 25 21 225 4.6 123.13300 -8.37290 11272 8207030010 TUTUHU MALUKU UTARA 21 Phase 2 6 6 156 1.2 128.23155 2.31049 11273 8104021013 WAEGEREN MALUKU 389 Phase 2 96 98 496 18.6 126.91934 -3.41677 11274 5316040003 OLE ATE NUSA TENGGARA TIMUR 286 Phase 2 56 39 368 8.5 119.49975 -9.49230 Annex II – Demand forecast results Page 15 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 11275 5304102009 HAUMENI NUSA TENGGARA TIMUR 72 Phase 1 20 14 060 3.0 124.66270 -9.88021 11276 5313130005 WELU NUSA TENGGARA TIMUR 427 Phase 1 106 89 994 19.4 120.52509 -8.51283 11277 5309070004 BILAL NUSA TENGGARA TIMUR 125 Phase 1 36 30 564 6.6 123.13262 -8.36639 11278 8207030010 TUTUHU MALUKU UTARA 30 Phase 2 9 9 234 1.9 128.23179 2.31183 11279 8104021011 GRANDENG MALUKU 86 Phase 2 24 24 624 4.7 126.92514 -3.42875 11280 5316040003 OLE ATE NUSA TENGGARA TIMUR 665 Phase 2 130 91 390 19.7 119.50042 -9.49315 11281 5304102009 HAUMENI NUSA TENGGARA TIMUR 106 Phase 1 29 20 387 4.4 124.65962 -9.87954 11282 5315040011 PONG NARANG NUSA TENGGARA TIMUR 639 Phase 1 134 113 766 24.5 120.34352 -8.48434 11283 5309070005 IPIEBANG NUSA TENGGARA TIMUR 233 Phase 1 67 56 883 12.3 123.13731 -8.36575 11284 8207030010 TUTUHU MALUKU UTARA 67 Phase 2 19 19 494 3.9 128.23197 2.31361 11285 8104021011 GRANDENG MALUKU 355 Phase 2 97 99 522 18.8 126.94564 -3.44283 11286 5317050014 KADI PADA NUSA TENGGARA TIMUR 556 Phase 2 138 97 014 20.9 119.17987 -9.42108 11287 5304102008 PUTUN NUSA TENGGARA TIMUR 6 Phase 1 3 2 109 0.5 124.65893 -9.87908 11288 5315040011 PONG NARANG NUSA TENGGARA TIMUR 619 Phase 1 130 110 370 23.8 120.35465 -8.48673 11289 5309070005 IPIEBANG NUSA TENGGARA TIMUR 477 Phase 1 136 115 464 24.9 123.14130 -8.37261 11290 8207030010 TUTUHU MALUKU UTARA 428 Phase 2 119 122 094 24.6 128.23284 2.31492 11291 8104021003 WAELO MALUKU 1 849 Phase 2 491 503 766 95.3 126.95260 -3.44108 11292 5317030004 NOHA NUSA TENGGARA TIMUR 1 762 Phase 2 334 234 802 50.7 119.08963 -9.55416 11293 5304102009 HAUMENI NUSA TENGGARA TIMUR 16 Phase 1 5 3 515 0.8 124.65860 -9.87935 11294 5315040011 PONG NARANG NUSA TENGGARA TIMUR 123 Phase 1 26 22 074 4.8 120.35717 -8.48999 11295 5309070004 BILAL NUSA TENGGARA TIMUR 313 Phase 1 88 74 712 16.1 123.12753 -8.36867 11296 8205010032 WANGEOTAK MALUKU UTARA 580 Phase 2 112 114 912 23.2 127.83763 1.15556 11297 8104021004 UPT R WAELEMAN MALUKU 653 Phase 2 169 173 394 32.8 126.95298 -3.43707 11298 5317040007 BURU DEILO NUSA TENGGARA TIMUR 613 Phase 2 157 110 371 23.8 119.18806 -9.53862 11299 5304102009 HAUMENI NUSA TENGGARA TIMUR 211 Phase 1 58 40 774 8.8 124.65628 -9.88510 11300 5315040011 PONG NARANG NUSA TENGGARA TIMUR 214 Phase 1 45 38 205 8.2 120.35865 -8.49060 11301 5309070056 TAPOBALI NUSA TENGGARA TIMUR 554 Phase 1 102 86 598 18.7 123.18851 -8.32454 11302 8206011003 WAILUKUM MALUKU UTARA 761 Phase 2 171 175 446 35.3 128.27256 0.72147 11303 8104021003 WAELO MALUKU 294 Phase 2 78 80 028 15.1 126.95492 -3.44087 11304 5317040007 BURU DEILO NUSA TENGGARA TIMUR 535 Phase 2 137 96 311 20.8 119.17925 -9.54672 11305 5304102009 HAUMENI NUSA TENGGARA TIMUR 252 Phase 1 69 48 507 10.5 124.65712 -9.89802 11306 5315040011 PONG NARANG NUSA TENGGARA TIMUR 325 Phase 1 68 57 732 12.5 120.36118 -8.49030 11307 5309062002 BAYA NUSA TENGGARA TIMUR 112 Phase 1 29 24 621 5.3 123.13386 -8.30169 11308 8206011001 MABA SANGAJI MALUKU UTARA 569 Phase 2 125 128 250 25.8 128.28987 0.70205 11309 8104021011 GRANDENG MALUKU 1 224 Phase 2 332 340 632 64.4 126.91813 -3.44300 11310 5317040007 BURU DEILO NUSA TENGGARA TIMUR 535 Phase 2 137 96 311 20.8 119.18265 -9.55527 11311 5304102009 HAUMENI NUSA TENGGARA TIMUR 586 Phase 1 161 113 183 24.4 124.64974 -9.89800 11312 5313130006 BARANG NUSA TENGGARA TIMUR 758 Phase 1 190 161 310 34.8 120.52201 -8.50525 11313 5310041009 RUNUT NUSA TENGGARA TIMUR 335 Phase 1 80 67 920 14.7 122.49958 -8.59891 11314 8206011001 MABA SANGAJI MALUKU UTARA 1 103 Phase 2 241 247 266 49.8 128.27694 0.69426 11315 8104021011 GRANDENG MALUKU 17 Phase 2 5 5 130 1.0 126.91814 -3.44910 11316 5317040007 BURU DEILO NUSA TENGGARA TIMUR 764 Phase 2 196 137 788 29.7 119.19084 -9.55660 11317 5304102002 SAENAM NUSA TENGGARA TIMUR 43 Phase 1 11 7 733 1.7 124.65843 -9.90458 11318 5313130007 PINGGANG NUSA TENGGARA TIMUR 16 Phase 1 4 3 396 0.7 120.53108 -8.50021 11319 5310041009 RUNUT NUSA TENGGARA TIMUR 654 Phase 1 156 132 444 28.6 122.50082 -8.59887 11320 8206011002 SOA GIMALAHA MALUKU UTARA 1 572 Phase 2 399 409 374 82.5 128.29540 0.69279 11321 8104021011 GRANDENG MALUKU 7 Phase 2 2 2 052 0.4 126.91571 -3.45005 11322 5317040007 BURU DEILO NUSA TENGGARA TIMUR 783 Phase 2 200 140 600 30.3 119.19910 -9.54680 11323 5304102002 SAENAM NUSA TENGGARA TIMUR 68 Phase 1 17 11 951 2.6 124.65561 -9.90677 11324 5313130007 PINGGANG NUSA TENGGARA TIMUR 12 Phase 1 3 2 547 0.5 120.53115 -8.49992 11325 5309040013 BALAWELING I NUSA TENGGARA TIMUR 177 Phase 1 48 40 752 8.8 122.96780 -8.44545 11326 8205010031 GAYOK MALUKU UTARA 500 Phase 2 107 109 782 22.1 127.87030 1.17640 11327 8104021001 UPT K WAPLAN MALUKU 203 Phase 2 50 51 300 9.7 126.91099 -3.47275 11328 5302052018 WANGA NUSA TENGGARA TIMUR 475 Phase 2 119 83 657 18.1 120.59633 -9.75739 11329 5304102001 OP NUSA TENGGARA TIMUR 1 417 Phase 1 354 248 862 53.7 124.64741 -9.91518 11330 5313130007 PINGGANG NUSA TENGGARA TIMUR 602 Phase 1 137 116 313 25.1 120.53667 -8.49554 11331 5309040013 BALAWELING I NUSA TENGGARA TIMUR 520 Phase 1 141 119 709 25.8 122.96548 -8.44748 11332 8205020005 WARINGIN LELEWI MALUKU UTARA 5 Phase 2 2 2 052 0.4 127.86972 1.17883 11333 8104021002 WAETINA MALUKU 1 801 Phase 2 519 532 494 100.7 126.92361 -3.47933 11334 5317040005 TENA TEKE NUSA TENGGARA TIMUR 441 Phase 2 84 59 052 12.7 119.20421 -9.55434 11335 5304102002 SAENAM NUSA TENGGARA TIMUR 526 Phase 1 127 89 281 19.3 124.66289 -9.90957 11336 5313130007 PINGGANG NUSA TENGGARA TIMUR 871 Phase 1 198 168 102 36.3 120.52966 -8.49092 11337 5310070015 MAHEBORA NUSA TENGGARA TIMUR 29 Phase 1 9 7 641 1.6 122.10987 -8.65884 11338 8205020005 WARINGIN LELEWI MALUKU UTARA 364 Phase 2 90 92 340 18.6 127.86592 1.18650 11339 8104021001 UPT K WAPLAN MALUKU 710 Phase 2 173 177 498 33.6 126.92059 -3.48540 11340 5317040005 TENA TEKE NUSA TENGGARA TIMUR 398 Phase 2 76 53 428 11.5 119.20008 -9.56879 11341 5304102002 SAENAM NUSA TENGGARA TIMUR 485 Phase 1 117 82 251 17.7 124.67113 -9.91079 11342 5310011001 KOROBHERA NUSA TENGGARA TIMUR 346 Phase 1 85 72 165 15.6 122.07135 -8.73948 11343 5310070015 MAHEBORA NUSA TENGGARA TIMUR 241 Phase 1 68 57 732 12.5 122.11230 -8.66111 11344 8205020007 SOASANGAJI DIM DIM MALUKU UTARA 378 Phase 2 90 92 340 18.6 127.86694 1.18960 11345 8103081002 ABUBU MALUKU 652 Phase 2 203 208 278 39.4 128.79032 -3.69208 11346 5317040005 TENA TEKE NUSA TENGGARA TIMUR 859 Phase 2 162 113 886 24.6 119.20231 -9.57233 11347 5304102003 SAHAN NUSA TENGGARA TIMUR 1 127 Phase 1 318 223 554 48.2 124.67175 -9.90267 11348 5310011001 KOROBHERA NUSA TENGGARA TIMUR 556 Phase 1 136 115 464 24.9 122.07947 -8.74456 11349 5310070010 RIIT NUSA TENGGARA TIMUR 53 Phase 1 15 12 735 2.7 122.11644 -8.65730 11350 8205020004 KAO MALUKU UTARA 284 Phase 2 67 68 742 13.8 127.87728 1.16978 11351 8109030006 LEKU MALUKU 14 Phase 2 4 4 104 0.8 126.80575 -3.80726 11352 5317040005 TENA TEKE NUSA TENGGARA TIMUR 307 Phase 2 58 40 774 8.8 119.21746 -9.56041 11353 5304102002 SAENAM NUSA TENGGARA TIMUR 170 Phase 1 41 28 823 6.2 124.67760 -9.91470 11354 5313041017 LING NUSA TENGGARA TIMUR 178 Phase 1 45 38 205 8.2 120.36745 -8.69939 11355 5310070001 TILANG NUSA TENGGARA TIMUR 356 Phase 1 100 84 900 18.3 122.12354 -8.66466 11356 8205020006 JATI MALUKU UTARA 965 Phase 2 237 243 162 49.0 127.90029 1.17088 11357 8109030010 WALI MALUKU 471 Phase 2 103 105 678 20.0 126.76510 -3.83259 11358 5317040005 TENA TEKE NUSA TENGGARA TIMUR 948 Phase 2 179 125 837 27.2 119.22234 -9.55926 11359 5304102003 SAHAN NUSA TENGGARA TIMUR 286 Phase 1 81 56 943 12.3 124.67940 -9.91523 Annex II – Demand forecast results Page 16 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 11360 5313041017 LING NUSA TENGGARA TIMUR 167 Phase 1 42 35 658 7.7 120.36612 -8.70055 11361 5310070010 RIIT NUSA TENGGARA TIMUR 758 Phase 1 209 177 441 38.3 122.12775 -8.65723 11362 8205020004 KAO MALUKU UTARA 1 203 Phase 2 284 291 384 58.7 127.90052 1.16707 11363 8109030009 LABUANG MALUKU 1 862 Phase 2 544 558 144 105.6 126.73430 -3.84788 11364 5317050001 RABA ENGGE NUSA TENGGARA TIMUR 241 Phase 2 46 32 338 7.0 119.22253 -9.55800 11365 5304102003 SAHAN NUSA TENGGARA TIMUR 335 Phase 1 95 66 785 14.4 124.67159 -9.89671 11366 5313041015 LIA NUSA TENGGARA TIMUR 140 Phase 1 40 33 960 7.3 120.36458 -8.70705 11367 5309074007 KOLI MASANG NUSA TENGGARA TIMUR 261 Phase 1 68 57 732 12.5 123.20189 -8.26618 11368 8207030013 SAMINYAMAU MALUKU UTARA 525 Phase 2 131 134 406 27.1 128.15882 2.28517 11369 8109030005 ELFULE MALUKU 444 Phase 2 93 95 418 18.0 126.73136 -3.84636 11370 5317050001 RABA ENGGE NUSA TENGGARA TIMUR 877 Phase 2 163 114 589 24.7 119.22823 -9.55959 11371 5304102008 PUTUN NUSA TENGGARA TIMUR 16 Phase 1 6 4 218 0.9 124.65844 -9.87915 11372 5313041015 LIA NUSA TENGGARA TIMUR 165 Phase 1 47 39 903 8.6 120.36253 -8.70824 11373 5309074006 NISA NULAN NUSA TENGGARA TIMUR 154 Phase 1 8 6 792 1.5 123.20496 -8.25850 11374 8207030015 LEO LEO MALUKU UTARA 1 343 Phase 2 376 385 776 77.7 128.13555 2.33991 11375 8103052007 WARAKA MALUKU 112 Phase 2 25 25 650 4.9 128.91350 -3.20496 11376 5317050001 RABA ENGGE NUSA TENGGARA TIMUR 831 Phase 2 157 110 371 23.8 119.22956 -9.56252 11377 5304102008 PUTUN NUSA TENGGARA TIMUR 30 Phase 1 11 7 733 1.7 124.65320 -9.87517 11378 5313041014 POPO NUSA TENGGARA TIMUR 134 Phase 1 35 29 715 6.4 120.37151 -8.70851 11379 5309074006 NISA NULAN NUSA TENGGARA TIMUR 237 Phase 1 70 59 430 12.8 123.21008 -8.25827 11380 8203063007 NATANG KUNING MALUKU UTARA 194 Phase 2 40 41 040 8.3 124.48992 -1.67636 11381 8103052007 WARAKA MALUKU 755 Phase 2 168 172 368 32.6 128.92643 -3.20761 11382 5317050001 RABA ENGGE NUSA TENGGARA TIMUR 879 Phase 2 166 116 698 25.2 119.23969 -9.57435 11383 5304102008 PUTUN NUSA TENGGARA TIMUR 140 Phase 1 52 36 556 7.9 124.65293 -9.87465 11384 5313041014 POPO NUSA TENGGARA TIMUR 137 Phase 1 36 30 564 6.6 120.37226 -8.71109 11385 5309074004 SAGU NUSA TENGGARA TIMUR 170 Phase 1 40 33 960 7.3 123.21853 -8.25452 11386 8203061008 TIKONG MALUKU UTARA 822 Phase 2 194 199 044 40.1 124.51125 -1.67266 11387 8103040004 SAUNULU MALUKU 1 166 Phase 2 237 243 162 46.0 129.51180 -3.30364 11388 5317030010 BILA CENGE NUSA TENGGARA TIMUR 451 Phase 2 103 72 409 15.6 119.07623 -9.46950 11389 5304100004 NUNLEU NUSA TENGGARA TIMUR 111 Phase 1 28 19 684 4.2 124.64945 -9.87615 11390 5313041015 LIA NUSA TENGGARA TIMUR 208 Phase 1 59 50 091 10.8 120.36744 -8.71713 11391 5309074004 SAGU NUSA TENGGARA TIMUR 229 Phase 1 54 45 846 9.9 123.22463 -8.24788 11392 8203061008 TIKONG MALUKU UTARA 1 609 Phase 2 378 387 828 78.1 124.52410 -1.66570 11393 8103040005 YAPUTIH MALUKU 1 553 Phase 2 290 297 540 56.3 129.52766 -3.29749 11394 5317030011 BUKAMBERO NUSA TENGGARA TIMUR 234 Phase 2 47 33 041 7.1 119.08069 -9.47125 11395 5304100004 NUNLEU NUSA TENGGARA TIMUR 45 Phase 1 12 8 436 1.8 124.64045 -9.87530 11396 5313041013 GULUNG NUSA TENGGARA TIMUR 143 Phase 1 32 27 168 5.9 120.36792 -8.71897 11397 5309074004 SAGU NUSA TENGGARA TIMUR 350 Phase 1 82 69 618 15.0 123.21810 -8.24479 11398 8205040032 TAGALAYA MALUKU UTARA 415 Phase 2 110 112 860 22.7 128.06654 1.73880 11399 8106021002 IHA MALUKU 972 Phase 2 235 241 110 45.6 127.97724 -3.40059 11400 5317030011 BUKAMBERO NUSA TENGGARA TIMUR 266 Phase 2 54 37 962 8.2 119.08340 -9.47273 11401 5304100004 NUNLEU NUSA TENGGARA TIMUR 131 Phase 1 33 23 199 5.0 124.63683 -9.87597 11402 5313041013 GULUNG NUSA TENGGARA TIMUR 156 Phase 1 35 29 715 6.4 120.37443 -8.72118 11403 5309074004 SAGU NUSA TENGGARA TIMUR 1 150 Phase 1 268 227 532 49.1 123.21360 -8.24275 11404 8205032002 GONGA MALUKU UTARA 662 Phase 2 156 160 056 32.2 128.01233 1.52207 11405 8109030005 ELFULE MALUKU 208 Phase 2 44 45 144 8.5 126.72869 -3.84552 11406 5301050007 TANA RARA NUSA TENGGARA TIMUR 254 Phase 2 52 36 556 7.9 119.47246 -9.54215 11407 5304100012 KUALEU NUSA TENGGARA TIMUR 133 Phase 1 34 23 902 5.2 124.63588 -9.87032 11408 5313041013 GULUNG NUSA TENGGARA TIMUR 83 Phase 1 19 16 131 3.5 120.37544 -8.72166 11409 5309074004 SAGU NUSA TENGGARA TIMUR 272 Phase 1 64 54 336 11.7 123.21298 -8.24732 11410 8201140012 BAKUN PANTAI MALUKU UTARA 216 Phase 2 50 51 300 10.3 127.62750 1.80397 11411 8103040005 YAPUTIH MALUKU 230 Phase 2 43 44 118 8.3 129.54864 -3.27077 11412 5301050007 TANA RARA NUSA TENGGARA TIMUR 175 Phase 2 36 25 308 5.5 119.47818 -9.53982 11413 5304100003 FATULUNU NUSA TENGGARA TIMUR 202 Phase 1 49 34 447 7.4 124.63462 -9.86695 11414 5313041013 GULUNG NUSA TENGGARA TIMUR 302 Phase 1 68 57 732 12.5 120.37732 -8.72170 11415 5309070015 LAMATEWELU NUSA TENGGARA TIMUR 171 Phase 1 53 44 997 9.7 123.23258 -8.35600 11416 8201140012 BAKUN PANTAI MALUKU UTARA 379 Phase 2 88 90 288 18.2 127.65310 1.81932 11417 8103040007 HATU MALUKU 1 056 Phase 2 222 227 772 43.1 129.57038 -3.30380 11418 5301050008 BALI LEDO NUSA TENGGARA TIMUR 776 Phase 2 158 111 074 24.0 119.48068 -9.55106 11419 5304100012 KUALEU NUSA TENGGARA TIMUR 156 Phase 1 39 27 417 5.9 124.64084 -9.86527 11420 5313041015 LIA NUSA TENGGARA TIMUR 273 Phase 1 77 65 373 14.1 120.36444 -8.71828 11421 5308060007 NORMAL NUSA TENGGARA TIMUR 44 Phase 1 15 12 735 2.7 123.75463 -8.18977 11422 8201140020 TOSOMOLO MALUKU UTARA 476 Phase 2 104 106 704 21.5 127.64803 1.84066 11423 8103040008 HATUMETE MALUKU 868 Phase 2 211 216 486 40.9 129.58907 -3.31034 11424 5301050008 BALI LEDO NUSA TENGGARA TIMUR 348 Phase 2 71 49 913 10.8 119.47871 -9.55265 11425 5304100012 KUALEU NUSA TENGGARA TIMUR 648 Phase 1 162 113 886 24.6 124.64223 -9.86377 11426 5313041013 GULUNG NUSA TENGGARA TIMUR 12 Phase 1 3 2 547 0.5 120.36360 -8.71869 11427 5309040014 BALAWELING II NUSA TENGGARA TIMUR 328 Phase 1 77 65 373 14.1 122.95510 -8.46401 11428 8201140013 BARATAKU MALUKU UTARA 477 Phase 2 102 104 652 21.1 127.66691 1.86884 11429 8103040009 MOSSO MALUKU 888 Phase 2 189 193 914 36.7 129.60171 -3.31055 11430 5301050008 BALI LEDO NUSA TENGGARA TIMUR 539 Phase 2 110 77 330 16.7 119.48016 -9.53882 11431 5304100003 FATULUNU NUSA TENGGARA TIMUR 23 Phase 1 6 4 218 0.9 124.62863 -9.87330 11432 5313041013 GULUNG NUSA TENGGARA TIMUR 273 Phase 1 61 51 789 11.2 120.36475 -8.72101 11433 5309040014 BALAWELING II NUSA TENGGARA TIMUR 388 Phase 1 91 77 259 16.7 122.95487 -8.47133 11434 8201140014 GAMKAHE MALUKU UTARA 467 Phase 2 91 93 366 18.8 127.67528 1.88345 11435 8103040010 TELUTI BARU MALUKU 1 375 Phase 2 330 338 580 64.0 129.62691 -3.31118 11436 5317080009 TOTOK NUSA TENGGARA TIMUR 462 Phase 2 101 71 003 15.3 119.31676 -9.47314 11437 5304100004 NUNLEU NUSA TENGGARA TIMUR 151 Phase 1 38 26 714 5.8 124.62876 -9.87401 11438 5313041013 GULUNG NUSA TENGGARA TIMUR 95 Phase 1 22 18 678 4.0 120.36655 -8.72610 11439 5309040015 DANI WATO NUSA TENGGARA TIMUR 412 Phase 1 83 70 467 15.2 122.95269 -8.48497 11440 8201140015 PUMADADA MALUKU UTARA 685 Phase 2 169 173 394 34.9 127.69972 1.91726 11441 8103041001 WOLU MALUKU 2 241 Phase 2 511 524 286 99.2 129.65636 -3.31597 11442 5317060006 OMBA RADE NUSA TENGGARA TIMUR 1 608 Phase 2 293 205 979 44.4 119.29969 -9.57227 11443 5304100003 FATULUNU NUSA TENGGARA TIMUR 206 Phase 1 50 35 150 7.6 124.62064 -9.87362 11444 5313041012 TODO NUSA TENGGARA TIMUR 1 133 Phase 1 308 261 492 56.4 120.37208 -8.73034 Annex II – Demand forecast results Page 17 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 11445 5309040015 DANI WATO NUSA TENGGARA TIMUR 188 Phase 1 38 32 262 7.0 122.95306 -8.48708 11446 8201140016 BAJA MALUKU UTARA 904 Phase 2 208 213 408 43.0 127.71885 1.94758 11447 8103041002 LAFA MALUKU 886 Phase 2 207 212 382 40.2 129.67042 -3.31879 11448 5317050011 REDA PADA NUSA TENGGARA TIMUR 853 Phase 2 182 127 946 27.6 119.19636 -9.50133 11449 5304100004 NUNLEU NUSA TENGGARA TIMUR 19 Phase 1 5 3 515 0.8 124.62027 -9.87387 11450 5313041016 KOLE NUSA TENGGARA TIMUR 135 Phase 1 28 23 772 5.1 120.35950 -8.68168 11451 5309040016 NUSADANI NUSA TENGGARA TIMUR 142 Phase 1 27 22 923 4.9 122.95254 -8.48787 11452 8201140019 JANGAILULU MALUKU UTARA 204 Phase 2 46 47 196 9.5 127.73749 1.96029 11453 8104021020 WAETELE MALUKU 39 Phase 2 11 11 286 2.1 126.97512 -3.35217 11454 5316011003 DAMEKA NUSA TENGGARA TIMUR 1 093 Phase 2 185 130 055 28.1 119.53450 -9.63634 11455 5304100004 NUNLEU NUSA TENGGARA TIMUR 504 Phase 1 125 87 875 19.0 124.62043 -9.88149 11456 5313041016 KOLE NUSA TENGGARA TIMUR 202 Phase 1 42 35 658 7.7 120.35845 -8.68370 11457 5309040016 NUSADANI NUSA TENGGARA TIMUR 448 Phase 1 85 72 165 15.6 122.95147 -8.49532 11458 8205060001 APULEA MALUKU UTARA 226 Phase 2 56 57 456 11.6 127.75298 1.96936 11459 8104021014 WAENETAT MALUKU 13 Phase 2 4 4 104 0.8 126.97690 -3.35340 11460 5301050011 DIRA TANA NUSA TENGGARA TIMUR 232 Phase 2 41 28 823 6.2 119.35658 -9.61694 11461 5304100004 NUNLEU NUSA TENGGARA TIMUR 1 080 Phase 1 266 186 998 40.3 124.62374 -9.88082 11462 5313041016 KOLE NUSA TENGGARA TIMUR 429 Phase 1 89 75 561 16.3 120.35632 -8.68685 11463 5310070010 RIIT NUSA TENGGARA TIMUR 111 Phase 1 31 26 319 5.7 122.12525 -8.65021 11464 8205060001 APULEA MALUKU UTARA 174 Phase 2 43 44 118 8.9 127.75232 1.97126 11465 8104021014 WAENETAT MALUKU 22 Phase 2 7 7 182 1.4 126.97897 -3.35482 11466 5301050010 WEE DABO NUSA TENGGARA TIMUR 1 956 Phase 2 301 211 603 45.7 119.35253 -9.63796 11467 5320040017 LEDEKEPAKA NUSA TENGGARA TIMUR 965 Phase 1 255 179 265 38.7 121.80467 -10.53829 11468 5313041016 KOLE NUSA TENGGARA TIMUR 61 Phase 1 13 11 037 2.4 120.35452 -8.68652 11469 5310070010 RIIT NUSA TENGGARA TIMUR 61 Phase 1 17 14 433 3.1 122.12481 -8.64873 11470 8205060002 ASIMIRO MALUKU UTARA 441 Phase 2 186 190 836 38.4 127.76124 1.98058 11471 8104021020 WAETELE MALUKU 12 Phase 2 4 4 104 0.8 126.97961 -3.35352 11472 5301072005 LINGU LANGO NUSA TENGGARA TIMUR 108 Phase 2 19 13 357 2.9 119.39462 -9.50018 11473 5304070015 BAKI NUSA TENGGARA TIMUR 329 Phase 1 102 71 706 15.5 124.48791 -9.91003 11474 5313041016 KOLE NUSA TENGGARA TIMUR 768 Phase 1 158 134 142 28.9 120.35062 -8.68999 11475 5310070010 RIIT NUSA TENGGARA TIMUR 226 Phase 1 63 53 487 11.5 122.12800 -8.64458 11476 8205060013 MOMOJIU MALUKU UTARA 178 Phase 2 86 88 236 17.8 127.78316 2.00565 11477 8104021020 WAETELE MALUKU 592 Phase 2 157 161 082 30.5 126.98016 -3.35025 11478 5301072005 LINGU LANGO NUSA TENGGARA TIMUR 369 Phase 2 64 44 992 9.7 119.39476 -9.49959 11479 5304070015 BAKI NUSA TENGGARA TIMUR 420 Phase 1 131 92 093 19.9 124.48867 -9.90700 11480 5313123012 WAE MANTANG NUSA TENGGARA TIMUR 390 Phase 1 85 72 165 15.6 120.39876 -8.49054 11481 5308030018 WAOWALA NUSA TENGGARA TIMUR 9 Phase 1 3 2 547 0.5 123.43864 -8.28581 11482 8205060003 DOTIA MALUKU UTARA 623 Phase 2 180 184 680 37.2 127.80678 2.04493 11483 8103052007 WARAKA MALUKU 311 Phase 2 70 71 820 13.6 128.95146 -3.18879 11484 5301072005 LINGU LANGO NUSA TENGGARA TIMUR 706 Phase 2 122 85 766 18.5 119.39994 -9.49374 11485 5320040002 RAENALULU NUSA TENGGARA TIMUR 1 427 Phase 1 352 247 456 53.4 121.81421 -10.55962 11486 5311031003 KEDEBODU NUSA TENGGARA TIMUR 582 Phase 1 136 115 464 24.9 121.65624 -8.80440 11487 5308030018 WAOWALA NUSA TENGGARA TIMUR 284 Phase 1 81 68 769 14.8 123.43706 -8.28729 11488 8205060014 WORIMOI MALUKU UTARA 247 Phase 2 69 70 794 14.3 127.83905 2.08240 11489 8107020050 KILGA KILWOUW MALUKU 618 Phase 2 302 309 852 58.6 130.81614 -3.66154 11490 5301072005 LINGU LANGO NUSA TENGGARA TIMUR 386 Phase 2 67 47 101 10.2 119.40238 -9.48675 11491 5320040001 TERIWU NUSA TENGGARA TIMUR 971 Phase 1 214 150 442 32.5 121.80810 -10.58071 11492 5315030019 WAE BANGKA NUSA TENGGARA TIMUR 337 Phase 1 77 65 373 14.1 120.29093 -8.66912 11493 5308030024 BEUTARAN NUSA TENGGARA TIMUR 197 Phase 1 65 55 185 11.9 123.43607 -8.28676 11494 8205060004 NGAJAM MALUKU UTARA 5 Phase 2 2 2 052 0.4 127.83952 2.08303 11495 8109030005 ELFULE MALUKU 1 518 Phase 2 318 326 268 61.7 126.71797 -3.84585 11496 5301072006 MANU KUKU NUSA TENGGARA TIMUR 307 Phase 2 51 35 853 7.7 119.41427 -9.49174 11497 5320020004 GURIMONEARU NUSA TENGGARA TIMUR 1 189 Phase 1 287 201 761 43.5 121.78812 -10.58403 11498 5315030019 WAE BANGKA NUSA TENGGARA TIMUR 387 Phase 1 88 74 712 16.1 120.29137 -8.66564 11499 5308011007 WULANDONI NUSA TENGGARA TIMUR 349 Phase 1 104 88 296 19.1 123.41863 -8.55275 11500 8205060004 NGAJAM MALUKU UTARA 204 Phase 2 44 45 144 9.1 127.83806 2.08474 11501 8106030028 URAUR MALUKU 1 003 Phase 2 210 215 460 40.7 128.38449 -3.32963 11502 5301072006 MANU KUKU NUSA TENGGARA TIMUR 179 Phase 2 30 21 090 4.6 119.41855 -9.49169 11503 5320020009 PEDARRO NUSA TENGGARA TIMUR 2 501 Phase 1 576 404 928 87.4 121.76741 -10.58293 11504 5311041004 ROGA NUSA TENGGARA TIMUR 96 Phase 1 30 25 470 5.5 121.79001 -8.81627 11505 5308011007 WULANDONI NUSA TENGGARA TIMUR 203 Phase 1 60 50 940 11.0 123.42142 -8.54145 11506 8205060004 NGAJAM MALUKU UTARA 154 Phase 2 34 34 884 7.0 127.83882 2.08927 11507 8104021014 WAENETAT MALUKU 109 Phase 2 31 31 806 6.0 126.96167 -3.40361 11508 5301072006 MANU KUKU NUSA TENGGARA TIMUR 295 Phase 2 49 34 447 7.4 119.42313 -9.48985 11509 5320020010 WADUMEDDI NUSA TENGGARA TIMUR 1 109 Phase 1 227 159 581 34.4 121.78826 -10.60090 11510 5311041004 ROGA NUSA TENGGARA TIMUR 703 Phase 1 217 184 233 39.8 121.79074 -8.81347 11511 5308011006 BELOBAO NUSA TENGGARA TIMUR 75 Phase 1 22 18 678 4.0 123.40880 -8.54244 11512 8205061001 TOBO TOBO MALUKU UTARA 529 Phase 2 126 129 276 26.0 127.78504 2.10619 11513 8104021014 WAENETAT MALUKU 672 Phase 2 188 192 888 36.5 126.96528 -3.40117 11514 5301072006 MANU KUKU NUSA TENGGARA TIMUR 596 Phase 2 99 69 597 15.0 119.42523 -9.49095 11515 5306020003 BAKIRUK NUSA TENGGARA TIMUR 23 Phase 1 6 4 218 0.9 124.86334 -9.58026 11516 5311041003 DEMULAKA NUSA TENGGARA TIMUR 223 Phase 1 66 56 034 12.1 121.78387 -8.81233 11517 5308011006 BELOBAO NUSA TENGGARA TIMUR 485 Phase 1 139 118 011 25.5 123.40873 -8.53785 11518 8205061001 TOBO TOBO MALUKU UTARA 165 Phase 2 40 41 040 8.3 127.78119 2.10781 11519 8104021017 WAEKASAR MALUKU 87 Phase 2 27 27 702 5.2 126.97968 -3.35566 11520 5301072007 WEE PATOLA NUSA TENGGARA TIMUR 894 Phase 2 155 108 965 23.5 119.42802 -9.50564 11521 5306020003 BAKIRUK NUSA TENGGARA TIMUR 1 188 Phase 1 309 217 227 46.9 124.85646 -9.57746 11522 5311041003 DEMULAKA NUSA TENGGARA TIMUR 251 Phase 1 74 62 826 13.6 121.77842 -8.81147 11523 5308011003 LAMALERA B NUSA TENGGARA TIMUR 62 Phase 1 18 15 282 3.3 123.40802 -8.54311 11524 8205061002 FITAKO MALUKU UTARA 363 Phase 2 120 123 120 24.8 127.76793 2.16887 11525 8104022001 WAEPOTI MALUKU 138 Phase 2 32 32 832 6.2 126.66939 -3.09928 11526 5301072002 LOLO WANO NUSA TENGGARA TIMUR 453 Phase 2 87 61 161 13.2 119.42340 -9.46980 11527 5306010033 MOTAAIN NUSA TENGGARA TIMUR 614 Phase 1 163 114 589 24.7 124.96374 -9.63019 11528 5311041003 DEMULAKA NUSA TENGGARA TIMUR 51 Phase 1 15 12 735 2.7 121.77410 -8.81190 11529 5308011003 LAMALERA B NUSA TENGGARA TIMUR 231 Phase 1 29 24 621 5.3 123.40812 -8.54513 Annex II – Demand forecast results Page 18 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 11530 8104022001 WAEPOTI MALUKU 1 156 Phase 2 262 268 812 50.8 126.67223 -3.07258 11531 5301072002 LOLO WANO NUSA TENGGARA TIMUR 153 Phase 2 30 21 090 4.6 119.42425 -9.46687 11532 8205061003 DEDETA MALUKU UTARA 610 Phase 2 148 151 848 30.6 127.76307 2.18069 11533 5304041002 TUPPAN NUSA TENGGARA TIMUR 132 Phase 1 39 27 417 5.9 124.12590 -9.94669 11534 5311041006 NGGUWA NUSA TENGGARA TIMUR 198 Phase 1 47 39 903 8.6 121.76496 -8.81884 11535 5308070019 RUMANG NUSA TENGGARA TIMUR 592 Phase 1 128 108 672 23.4 123.84916 -8.22210 11536 8104022002 WAPREA MALUKU 308 Phase 2 73 74 898 14.2 126.69411 -3.06804 11537 5301072002 LOLO WANO NUSA TENGGARA TIMUR 1 354 Phase 2 259 182 077 39.3 119.42180 -9.45528 11538 8205061006 TUA KARA MALUKU UTARA 126 Phase 2 50 51 300 10.3 127.77092 2.19970 11539 5304041002 TUPPAN NUSA TENGGARA TIMUR 433 Phase 1 127 89 281 19.3 124.12297 -9.94788 11540 5311041002 SOKORIA NUSA TENGGARA TIMUR 175 Phase 1 53 44 997 9.7 121.75851 -8.80801 11541 5309050011 WATOBUKU NUSA TENGGARA TIMUR 89 Phase 1 25 21 225 4.6 123.15430 -8.43962 11542 8104022002 WAPREA MALUKU 8 Phase 2 2 2 052 0.4 126.69622 -3.06831 11543 5302060011 WATUMBAKA NUSA TENGGARA TIMUR 1 582 Phase 2 221 155 363 33.5 120.39623 -9.67482 11544 8205061007 DAMA MALUKU UTARA 1 330 Phase 2 412 422 712 85.2 127.79436 2.22124 11545 5304041002 TUPPAN NUSA TENGGARA TIMUR 32 Phase 1 10 7 030 1.5 124.12445 -9.94003 11546 5311041001 KURULIMBU NUSA TENGGARA TIMUR 895 Phase 1 206 174 894 37.7 121.75197 -8.81060 11547 5309050009 TANAH WERANG NUSA TENGGARA TIMUR 494 Phase 1 149 126 501 27.3 123.15309 -8.44579 11548 8104022002 WAPREA MALUKU 389 Phase 2 92 94 392 17.9 126.73412 -3.06001 11549 5301072003 NGADU PADA NUSA TENGGARA TIMUR 137 Phase 2 30 21 090 4.6 119.40065 -9.45879 11550 8205061010 SALUBE MALUKU UTARA 1 478 Phase 2 406 416 556 83.9 127.80282 2.22943 11551 5304041002 TUPPAN NUSA TENGGARA TIMUR 477 Phase 1 140 98 420 21.2 124.12847 -9.93883 11552 5311041002 SOKORIA NUSA TENGGARA TIMUR 633 Phase 1 191 162 159 35.0 121.76002 -8.80379 11553 5308060007 NORMAL NUSA TENGGARA TIMUR 12 Phase 1 4 3 396 0.7 123.75487 -8.19105 11554 8104022004 HATAWANO MALUKU 811 Phase 2 242 248 292 47.0 126.76862 -3.06207 11555 5301072003 NGADU PADA NUSA TENGGARA TIMUR 1 435 Phase 2 270 189 810 41.0 119.39442 -9.45977 11556 8205061004 DAGASULI MALUKU UTARA 566 Phase 2 183 187 758 37.8 127.75228 2.18895 11557 5304020004 TUASENE NUSA TENGGARA TIMUR 834 Phase 1 229 160 987 34.7 124.13244 -9.93491 11558 5311041002 SOKORIA NUSA TENGGARA TIMUR 165 Phase 1 50 42 450 9.2 121.76449 -8.80315 11559 5308060021 NORMAL I NUSA TENGGARA TIMUR 83 Phase 1 28 23 772 5.1 123.75293 -8.19165 11560 8104022005 NAMSINA MALUKU 1 004 Phase 2 224 229 824 43.5 126.80596 -3.06768 11561 5317020005 PERO BATANG NUSA TENGGARA TIMUR 1 503 Phase 2 116 81 548 17.6 118.98713 -9.60484 11562 8205060005 DORUME MALUKU UTARA 650 Phase 2 204 209 304 42.2 127.84611 2.09297 11563 5305060008 HAUTEAS NUSA TENGGARA TIMUR 511 Phase 1 113 79 439 17.1 124.83159 -9.29722 11564 5311041002 SOKORIA NUSA TENGGARA TIMUR 190 Phase 1 58 49 242 10.6 121.76229 -8.79949 11565 5309070003 DAWATAA NUSA TENGGARA TIMUR 92 Phase 1 26 22 074 4.8 123.13231 -8.36214 11566 8104022006 SAMALAGI MALUKU 375 Phase 2 112 114 912 21.7 126.81984 -3.07365 11567 5317080009 TOTOK NUSA TENGGARA TIMUR 249 Phase 2 55 38 665 8.3 119.31185 -9.47705 11568 8205060006 KAILUPA MALUKU UTARA 467 Phase 2 128 131 328 26.5 127.87910 2.11773 11569 5306023006 TUNABESI NUSA TENGGARA TIMUR 1 578 Phase 1 448 314 944 68.0 124.79638 -9.48664 11570 5311041002 SOKORIA NUSA TENGGARA TIMUR 135 Phase 1 41 34 809 7.5 121.76141 -8.79754 11571 5309070003 DAWATAA NUSA TENGGARA TIMUR 80 Phase 1 22 18 678 4.0 123.13023 -8.36213 11572 8104022007 WAEURA MALUKU 47 Phase 2 13 13 338 2.5 126.83408 -3.08255 11573 5317080009 TOTOK NUSA TENGGARA TIMUR 233 Phase 2 51 35 853 7.7 119.30608 -9.48286 11574 8205060007 GISIK MALUKU UTARA 396 Phase 2 120 123 120 24.8 127.90383 2.13962 11575 5304040012 NULLE NUSA TENGGARA TIMUR 16 Phase 1 5 3 515 0.8 124.34213 -9.88470 11576 5311041002 SOKORIA NUSA TENGGARA TIMUR 158 Phase 1 48 40 752 8.8 121.76533 -8.79784 11577 5307062004 PURA TIMUR NUSA TENGGARA TIMUR 61 Phase 1 9 7 641 1.6 124.37458 -8.29420 11578 8104022007 WAEURA MALUKU 1 222 Phase 2 325 333 450 63.1 126.84133 -3.08792 11579 5317060012 LOMBU NUSA TENGGARA TIMUR 633 Phase 2 108 75 924 16.4 119.29632 -9.48904 11580 8205060015 GALAO MALUKU UTARA 508 Phase 2 133 136 458 27.5 127.90524 2.14261 11581 5304040012 NULLE NUSA TENGGARA TIMUR 73 Phase 1 21 14 763 3.2 124.34225 -9.88394 11582 5313123001 PONG LENGOR NUSA TENGGARA TIMUR 147 Phase 1 38 32 262 7.0 120.36134 -8.54861 11583 5307062004 PURA TIMUR NUSA TENGGARA TIMUR 56 Phase 1 16 13 584 2.9 124.37538 -8.29502 11584 8104022008 WAPLAU MALUKU 1 373 Phase 2 334 342 684 64.8 126.88149 -3.12215 11585 5317060011 KALI NGARA NUSA TENGGARA TIMUR 1 939 Phase 2 330 231 990 50.1 119.26658 -9.47987 11586 8205060008 KAPA KAPA MALUKU UTARA 477 Phase 2 157 161 082 32.5 127.92356 2.15760 11587 5304040012 NULLE NUSA TENGGARA TIMUR 193 Phase 1 54 37 962 8.2 124.34487 -9.88296 11588 5319050002 BANGKA KULENG NUSA TENGGARA TIMUR 436 Phase 1 108 91 692 19.8 120.54130 -8.56452 11589 5307062004 PURA TIMUR NUSA TENGGARA TIMUR 30 Phase 1 9 7 641 1.6 124.37188 -8.29979 11590 8104022008 WAPLAU MALUKU 140 Phase 2 34 34 884 6.6 126.88524 -3.12352 11591 5301072003 NGADU PADA NUSA TENGGARA TIMUR 46 Phase 2 10 7 030 1.5 119.39527 -9.45184 11592 8205060009 POCAO MALUKU UTARA 685 Phase 2 205 210 330 42.4 127.93148 2.16400 11593 5304040012 NULLE NUSA TENGGARA TIMUR 23 Phase 1 7 4 921 1.1 124.34738 -9.88172 11594 5319050002 BANGKA KULENG NUSA TENGGARA TIMUR 280 Phase 1 70 59 430 12.8 120.54418 -8.55944 11595 5307062003 MARU NUSA TENGGARA TIMUR 167 Phase 1 45 38 205 8.2 124.37094 -8.30622 11596 8104022009 LAMAHANG MALUKU 1 666 Phase 2 354 363 204 68.7 126.89103 -3.12869 11597 5301072004 MALATA NUSA TENGGARA TIMUR 1 779 Phase 2 252 177 156 38.2 119.38486 -9.45028 11598 8205061005 JIKOLAMO MALUKU UTARA 184 Phase 2 68 69 768 14.1 127.73921 2.18818 11599 5304040012 NULLE NUSA TENGGARA TIMUR 190 Phase 1 53 37 259 8.0 124.34910 -9.87945 11600 5313040034 NGKAER NUSA TENGGARA TIMUR 175 Phase 1 40 33 960 7.3 120.38567 -8.68411 11601 5307062003 MARU NUSA TENGGARA TIMUR 509 Phase 1 137 116 313 25.1 124.36522 -8.31609 11602 8104021017 WAEKASAR MALUKU 2 149 Phase 2 647 663 822 125.5 126.98633 -3.36055 11603 5317040005 TENA TEKE NUSA TENGGARA TIMUR 772 Phase 2 146 102 638 22.1 119.22065 -9.56615 11604 8205020009 KUSU MALUKU UTARA 417 Phase 2 121 124 146 25.0 127.90070 1.17346 11605 5304040012 NULLE NUSA TENGGARA TIMUR 237 Phase 1 66 46 398 10.0 124.35170 -9.87994 11606 5313040034 NGKAER NUSA TENGGARA TIMUR 299 Phase 1 68 57 732 12.5 120.38794 -8.68536 11607 5307062003 MARU NUSA TENGGARA TIMUR 58 Phase 1 16 13 584 2.9 124.36153 -8.32214 11608 8106021003 LUHU MALUKU 892 Phase 2 147 150 822 28.5 127.97666 -3.40260 11609 5301072004 MALATA NUSA TENGGARA TIMUR 79 Phase 2 14 9 842 2.1 119.38137 -9.44335 11610 8205060010 TATE MALUKU UTARA 385 Phase 2 115 117 990 23.8 127.93800 2.18118 11611 5304022003 KOA NUSA TENGGARA TIMUR 351 Phase 1 100 70 300 15.2 124.11544 -9.93396 11612 5313040035 GOLO LAMBO NUSA TENGGARA TIMUR 326 Phase 1 70 59 430 12.8 120.38371 -8.67308 11613 5307062003 MARU NUSA TENGGARA TIMUR 58 Phase 1 16 13 584 2.9 124.35715 -8.32237 11614 8104023001 ILATH MALUKU 765 Phase 2 164 168 264 31.8 127.24465 -3.60321 Annex II – Demand forecast results Page 19 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 11615 5301072004 MALATA NUSA TENGGARA TIMUR 1 127 Phase 2 199 139 897 30.2 119.37958 -9.44036 11616 8201140002 TOLOFUO MALUKU UTARA 148 Phase 2 30 30 780 6.2 127.56687 1.61166 11617 5304022003 KOA NUSA TENGGARA TIMUR 123 Phase 1 35 24 605 5.3 124.10872 -9.93139 11618 5313040035 GOLO LAMBO NUSA TENGGARA TIMUR 455 Phase 1 98 83 202 18.0 120.38164 -8.66756 11619 5307062002 PURA SELATAN NUSA TENGGARA TIMUR 565 Phase 1 147 124 803 26.9 124.35484 -8.32276 11620 8107040013 UPT X SUMBER AGUNG MALUKU 611 Phase 2 188 192 888 36.5 130.30379 -3.05037 11621 5317080012 BONDO BOGHILA NUSA TENGGARA TIMUR 1 958 Phase 2 395 277 685 59.9 119.36142 -9.41573 11622 8201140002 TOLOFUO MALUKU UTARA 326 Phase 2 64 65 664 13.2 127.55320 1.60085 11623 5304022003 KOA NUSA TENGGARA TIMUR 254 Phase 1 72 50 616 10.9 124.10665 -9.93428 11624 5313040036 JAONG NUSA TENGGARA TIMUR 356 Phase 1 84 71 316 15.4 120.38079 -8.66301 11625 5308030024 BEUTARAN NUSA TENGGARA TIMUR 399 Phase 1 130 110 370 23.8 123.43503 -8.28221 11626 8107040008 BENGGOI MALUKU 147 Phase 2 36 36 936 7.0 130.25794 -3.05127 11627 5317040005 TENA TEKE NUSA TENGGARA TIMUR 476 Phase 2 90 63 270 13.7 119.21772 -9.56705 11628 8201140001 TOTALA MALUKU UTARA 780 Phase 2 141 144 666 29.1 127.55451 1.59670 11629 5304022003 KOA NUSA TENGGARA TIMUR 131 Phase 1 38 26 714 5.8 124.09505 -9.93532 11630 5319050017 COMPANG LAHO NUSA TENGGARA TIMUR 81 Phase 1 19 16 131 3.5 120.55096 -8.53452 11631 5309061007 OYANGBARANG NUSA TENGGARA TIMUR 100 Phase 1 27 22 923 4.9 123.07358 -8.40375 11632 8107040009 UPT T JAKARTA BARU MALUKU 953 Phase 2 366 375 516 71.0 130.25808 -3.06020 11633 5317080006 WEE PANGALI NUSA TENGGARA TIMUR 535 Phase 2 117 82 251 17.7 119.25594 -9.43553 11634 8205060012 POSI POSI MALUKU UTARA 120 Phase 2 37 37 962 7.6 127.96093 2.19944 11635 5319050017 COMPANG LAHO NUSA TENGGARA TIMUR 69 Phase 1 17 14 433 3.1 120.55302 -8.53820 11636 5304022003 KOA NUSA TENGGARA TIMUR 813 Phase 1 230 161 690 34.9 124.09048 -9.93378 11637 5309061007 OYANGBARANG NUSA TENGGARA TIMUR 502 Phase 1 132 112 068 24.2 123.06567 -8.40536 11638 8107040009 UPT T JAKARTA BARU MALUKU 56 Phase 2 22 22 572 4.3 130.25518 -3.06456 11639 5317030006 KORI NUSA TENGGARA TIMUR 305 Phase 2 60 42 180 9.1 119.04997 -9.50566 11640 8205060012 POSI POSI MALUKU UTARA 629 Phase 2 190 194 940 39.3 127.96123 2.20566 11641 5319050017 COMPANG LAHO NUSA TENGGARA TIMUR 72 Phase 1 17 14 433 3.1 120.55469 -8.53688 11642 5304022003 KOA NUSA TENGGARA TIMUR 111 Phase 1 32 22 496 4.9 124.10700 -9.93638 11643 5308011004 IMULOLONG NUSA TENGGARA TIMUR 597 Phase 1 142 120 558 26.0 123.38411 -8.51712 11644 8107040010 UPT R WAIKETAM BARU MALUKU 225 Phase 2 74 75 924 14.4 130.19354 -3.05116 11645 5317030006 KORI NUSA TENGGARA TIMUR 681 Phase 2 132 92 796 20.0 119.05667 -9.50247 11646 8205020026 GORUANG MALUKU UTARA 13 Phase 2 4 4 104 0.8 127.90194 1.17551 11647 5319050017 COMPANG LAHO NUSA TENGGARA TIMUR 188 Phase 1 44 37 356 8.1 120.56229 -8.53290 11648 5320020003 LEDEAE NUSA TENGGARA TIMUR 1 139 Phase 1 237 166 611 35.9 121.76135 -10.60318 11649 5310041009 RUNUT NUSA TENGGARA TIMUR 103 Phase 1 25 21 225 4.6 122.50839 -8.61140 11650 8107040010 UPT R WAIKETAM BARU MALUKU 846 Phase 2 277 284 202 53.7 130.17483 -3.04767 11651 5317030009 KENDU WELA NUSA TENGGARA TIMUR 212 Phase 2 63 44 289 9.6 119.03876 -9.46485 11652 8205020026 GORUANG MALUKU UTARA 376 Phase 2 98 100 548 20.3 127.90203 1.17841 11653 5319050027 MELO NUSA TENGGARA TIMUR 609 Phase 1 121 102 729 22.2 120.56230 -8.52294 11654 5304071006 OELEU NUSA TENGGARA TIMUR 281 Phase 1 81 56 943 12.3 124.53720 -9.97298 11655 5310041009 RUNUT NUSA TENGGARA TIMUR 181 Phase 1 44 37 356 8.1 122.50718 -8.62334 11656 8107040011 WAIMATAKABU MALUKU 303 Phase 2 83 85 158 16.1 130.14643 -3.04597 11657 5317030009 KENDU WELA NUSA TENGGARA TIMUR 294 Phase 2 88 61 864 13.3 119.03353 -9.46880 11658 8207030016 ARU BURUNG MALUKU UTARA 571 Phase 2 150 153 900 31.0 128.17613 2.37828 11659 5319050027 MELO NUSA TENGGARA TIMUR 287 Phase 1 57 48 393 10.4 120.56471 -8.51967 11660 5320040004 TITINALEDE NUSA TENGGARA TIMUR 639 Phase 1 168 118 104 25.5 121.82915 -10.56641 11661 5310041009 RUNUT NUSA TENGGARA TIMUR 285 Phase 1 68 57 732 12.5 122.51441 -8.62998 11662 8107040020 WAISAMET MALUKU 605 Phase 2 200 205 200 38.8 130.13346 -3.02958 11663 5301050007 TANA RARA NUSA TENGGARA TIMUR 360 Phase 2 73 51 319 11.1 119.48003 -9.53642 11664 8207030017 LOU MADORO MALUKU UTARA 726 Phase 2 198 203 148 40.9 128.17267 2.39337 11665 5319050027 MELO NUSA TENGGARA TIMUR 715 Phase 1 142 120 558 26.0 120.56625 -8.51433 11666 5320030007 LOBORUI NUSA TENGGARA TIMUR 716 Phase 1 168 118 104 25.5 121.84178 -10.58356 11667 5310041009 RUNUT NUSA TENGGARA TIMUR 140 Phase 1 34 28 866 6.2 122.52199 -8.62890 11668 8107040021 AKI JAYA MALUKU 599 Phase 2 152 155 952 29.5 130.14209 -3.01866 11669 5317080009 TOTOK NUSA TENGGARA TIMUR 322 Phase 2 71 49 913 10.8 119.31038 -9.47511 11670 8205020027 KUSU LOVRA MALUKU UTARA 363 Phase 2 103 105 678 21.3 127.90670 1.18701 11671 5313122002 LAMBA KETANG NUSA TENGGARA TIMUR 304 Phase 1 69 58 581 12.6 120.32588 -8.64306 11672 5320030004 MEHONA NUSA TENGGARA TIMUR 743 Phase 1 170 119 510 25.8 121.82870 -10.59322 11673 5310041009 RUNUT NUSA TENGGARA TIMUR 105 Phase 1 25 21 225 4.6 122.54466 -8.61966 11674 8103143009 NAMTO MALUKU 311 Phase 2 107 109 782 20.8 130.10002 -3.03464 11675 5317040005 TENA TEKE NUSA TENGGARA TIMUR 237 Phase 2 45 31 635 6.8 119.21635 -9.58357 11676 8205022005 BOBALE MALUKU UTARA 849 Phase 2 193 198 018 39.9 128.01411 1.28530 11677 5313122002 LAMBA KETANG NUSA TENGGARA TIMUR 198 Phase 1 45 38 205 8.2 120.32196 -8.64623 11678 5320030005 EIKARE NUSA TENGGARA TIMUR 451 Phase 1 100 70 300 15.2 121.82592 -10.59919 11679 5310041009 RUNUT NUSA TENGGARA TIMUR 142 Phase 1 34 28 866 6.2 122.54477 -8.61630 11680 8103143007 AKETERNATE MALUKU 294 Phase 2 73 74 898 14.2 130.08111 -3.04741 11681 5317040004 DELO NUSA TENGGARA TIMUR 895 Phase 2 191 134 273 29.0 119.21513 -9.59681 11682 8205061008 DOWONGGILA MALUKU UTARA 303 Phase 2 105 107 730 21.7 127.77468 2.23725 11683 5313122002 LAMBA KETANG NUSA TENGGARA TIMUR 285 Phase 1 64 54 336 11.7 120.31962 -8.64790 11684 5320030003 RAEROBO NUSA TENGGARA TIMUR 933 Phase 1 217 152 551 32.9 121.81847 -10.60625 11685 5310041008 WATUDIRAN NUSA TENGGARA TIMUR 228 Phase 1 61 51 789 11.2 122.55428 -8.63513 11686 8103143010 WAIMUSAL MALUKU 493 Phase 2 302 309 852 58.6 130.07581 -3.03802 11687 5317040004 DELO NUSA TENGGARA TIMUR 1 626 Phase 2 346 243 238 52.5 119.22794 -9.60036 11688 8205061009 CERA MALUKU UTARA 352 Phase 2 129 132 354 26.7 127.76665 2.25939 11689 5313122005 PONG UMPU NUSA TENGGARA TIMUR 61 Phase 1 14 11 886 2.6 120.31198 -8.64409 11690 5320020005 LEDERAGA NUSA TENGGARA TIMUR 1 357 Phase 1 332 233 396 50.4 121.70454 -10.58374 11691 5310041008 WATUDIRAN NUSA TENGGARA TIMUR 515 Phase 1 138 117 162 25.3 122.55701 -8.63837 11692 8103143008 TANAH MERAH MALUKU 1 115 Phase 2 285 292 410 55.3 130.03424 -3.04698 11693 5317060008 EKA PATA NUSA TENGGARA TIMUR 2 094 Phase 2 337 236 911 51.1 119.27912 -9.58491 11694 8205052003 ROKO MALUKU UTARA 790 Phase 2 219 224 694 45.3 127.75891 1.85798 11695 5313122005 PONG UMPU NUSA TENGGARA TIMUR 126 Phase 1 28 23 772 5.1 120.29989 -8.64332 11696 5320030006 LEDEKE NUSA TENGGARA TIMUR 726 Phase 1 205 144 115 31.1 121.85888 -10.59181 11697 5310041008 WATUDIRAN NUSA TENGGARA TIMUR 252 Phase 1 68 57 732 12.5 122.54047 -8.65378 11698 8103143006 WAIPUTIH MALUKU 959 Phase 2 260 266 760 50.4 129.97894 -3.03233 11699 5317050006 KALEMBU WERI NUSA TENGGARA TIMUR 377 Phase 2 93 65 379 14.1 119.20212 -9.52470 Annex II – Demand forecast results Page 20 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 11700 8205060011 SUPU MALUKU UTARA 1 043 Phase 2 291 298 566 60.2 127.97839 2.18267 11701 5313122005 PONG UMPU NUSA TENGGARA TIMUR 393 Phase 1 86 73 014 15.8 120.29106 -8.64501 11702 5320030008 EILOGO NUSA TENGGARA TIMUR 842 Phase 1 263 184 889 39.9 121.88336 -10.58773 11703 5310041008 WATUDIRAN NUSA TENGGARA TIMUR 337 Phase 1 90 76 410 16.5 122.53734 -8.67229 11704 8103143005 WAITILA MALUKU 1 235 Phase 2 320 328 320 62.1 129.97640 -3.04352 11705 5317030006 KORI NUSA TENGGARA TIMUR 861 Phase 2 167 117 401 25.3 119.06133 -9.52225 11706 8205060017 PODOL MALUKU UTARA 58 Phase 2 18 18 468 3.7 127.97822 2.18151 11707 5313122005 PONG UMPU NUSA TENGGARA TIMUR 214 Phase 1 47 39 903 8.6 120.29326 -8.63596 11708 5320030009 HALAPAJI NUSA TENGGARA TIMUR 673 Phase 1 180 126 540 27.3 121.90387 -10.58487 11709 5310032015 HALE NUSA TENGGARA TIMUR 2 415 Phase 1 679 576 471 124.4 122.52771 -8.68457 11710 8103143003 SETI MALUKU 494 Phase 2 107 109 782 20.8 129.97088 -3.04295 11711 5301072001 LOKO RY NUSA TENGGARA TIMUR 721 Phase 2 101 71 003 15.3 119.39247 -9.42802 11712 8205060017 PODOL MALUKU UTARA 159 Phase 2 48 49 248 9.9 127.97896 2.17906 11713 5313122005 PONG UMPU NUSA TENGGARA TIMUR 202 Phase 1 44 37 356 8.1 120.29840 -8.63149 11714 5320030011 LEDETALO NUSA TENGGARA TIMUR 650 Phase 1 183 128 649 27.8 121.90991 -10.57394 11715 5307062002 PURA SELATAN NUSA TENGGARA TIMUR 93 Phase 1 25 21 225 4.6 124.34723 -8.32197 11716 8103143004 WAILOPING MALUKU 38 Phase 2 12 12 312 2.3 129.95252 -3.03300 11717 5301072001 LOKO RY NUSA TENGGARA TIMUR 329 Phase 2 75 52 725 11.4 119.39783 -9.41976 11718 8205020020 KUKUMUTUK MALUKU UTARA 388 Phase 2 84 86 184 17.4 127.91459 1.22672 11719 5313122005 PONG UMPU NUSA TENGGARA TIMUR 47 Phase 1 11 9 339 2.0 120.30002 -8.63010 11720 5320030010 KOTAHAWU NUSA TENGGARA TIMUR 892 Phase 1 254 178 562 38.5 121.90014 -10.56475 11721 5307062002 PURA SELATAN NUSA TENGGARA TIMUR 311 Phase 1 81 68 769 14.8 124.34106 -8.32472 11722 8103143004 WAILOPING MALUKU 864 Phase 2 251 257 526 48.7 129.95016 -3.03025 11723 5301072001 LOKO RY NUSA TENGGARA TIMUR 182 Phase 2 42 29 526 6.4 119.39991 -9.41910 11724 8205020021 PATANG MALUKU UTARA 446 Phase 2 117 120 042 24.2 127.92163 1.23133 11725 5313122002 LAMBA KETANG NUSA TENGGARA TIMUR 413 Phase 1 93 78 957 17.0 120.30639 -8.62598 11726 5320030002 WADUWALA NUSA TENGGARA TIMUR 785 Phase 1 223 156 769 33.8 121.85675 -10.61196 11727 5309050006 LIWO NUSA TENGGARA TIMUR 622 Phase 1 154 130 746 28.2 123.09598 -8.45688 11728 8103143001 TIHUANA MALUKU 814 Phase 2 302 309 852 58.6 129.93061 -3.02273 11729 5301072001 LOKO RY NUSA TENGGARA TIMUR 367 Phase 2 83 58 349 12.6 119.40287 -9.41962 11730 8205020022 BIANG MALUKU UTARA 642 Phase 2 147 150 822 30.4 127.93946 1.24061 11731 5313122003 BANGKA LELAK NUSA TENGGARA TIMUR 594 Phase 1 142 120 558 26.0 120.31053 -8.61856 11732 5303120011 NOELBAKI NUSA TENGGARA TIMUR 468 Phase 1 143 100 529 21.7 123.72380 -10.13417 11733 5310031016 WOLONTERANG NUSA TENGGARA TIMUR 254 Phase 1 56 47 544 10.3 122.35853 -8.72977 11734 8103143004 WAILOPING MALUKU 53 Phase 2 16 16 416 3.1 129.94947 -3.01058 11735 5301072001 LOKO RY NUSA TENGGARA TIMUR 552 Phase 2 125 87 875 19.0 119.40192 -9.42279 11736 8205022001 GAMLAHA MALUKU UTARA 1 085 Phase 2 255 261 630 52.7 127.96215 1.26694 11737 5313122003 BANGKA LELAK NUSA TENGGARA TIMUR 105 Phase 1 25 21 225 4.6 120.31404 -8.61479 11738 5306050010 BAKUSTULAMA NUSA TENGGARA TIMUR 251 Phase 1 56 39 368 8.5 124.87385 -9.25199 11739 5310041008 WATUDIRAN NUSA TENGGARA TIMUR 225 Phase 1 60 50 940 11.0 122.54062 -8.67379 11740 8103143004 WAILOPING MALUKU 1 175 Phase 2 341 349 866 66.2 129.94958 -3.00675 11741 5317050006 KALEMBU WERI NUSA TENGGARA TIMUR 211 Phase 2 52 36 556 7.9 119.20862 -9.52338 11742 8201140017 BOSALA MALUKU UTARA 510 Phase 2 119 122 094 24.6 127.53885 1.57688 11743 5313122008 BANGKA DESE NUSA TENGGARA TIMUR 206 Phase 1 43 36 507 7.9 120.30637 -8.60981 11744 5306050010 BAKUSTULAMA NUSA TENGGARA TIMUR 241 Phase 1 53 37 259 8.0 124.87615 -9.25106 11745 5309061007 OYANGBARANG NUSA TENGGARA TIMUR 197 Phase 1 52 44 148 9.5 123.05865 -8.40032 11746 8103143003 SETI MALUKU 491 Phase 2 106 108 756 20.6 129.95297 -3.00653 11747 5317080011 LETE KONDA NUSA TENGGARA TIMUR 1 709 Phase 2 304 213 712 46.1 119.34591 -9.37995 11748 8207050008 LOSUO MALUKU UTARA 1 128 Phase 2 253 259 578 52.3 128.63131 2.53396 11749 5313122004 GELONG NUSA TENGGARA TIMUR 170 Phase 1 42 35 658 7.7 120.30382 -8.60605 11750 5306050010 BAKUSTULAMA NUSA TENGGARA TIMUR 622 Phase 1 137 96 311 20.8 124.88055 -9.24046 11751 5309061006 NAYUBAYA NUSA TENGGARA TIMUR 395 Phase 1 95 80 655 17.4 123.04638 -8.39828 11752 8103143004 WAILOPING MALUKU 50 Phase 2 15 15 390 2.9 129.95049 -2.99964 11753 5301072001 LOKO RY NUSA TENGGARA TIMUR 337 Phase 2 77 54 131 11.7 119.41686 -9.43377 11754 8203061001 SAHU MALUKU UTARA 1 289 Phase 2 331 339 606 68.4 124.55626 -1.64637 11755 5313122004 GELONG NUSA TENGGARA TIMUR 920 Phase 1 224 190 176 41.0 120.30122 -8.60683 11756 5306050010 BAKUSTULAMA NUSA TENGGARA TIMUR 248 Phase 1 55 38 665 8.3 124.89057 -9.23967 11757 5309061006 NAYUBAYA NUSA TENGGARA TIMUR 73 Phase 1 18 15 282 3.3 123.03659 -8.39930 11758 8103143003 SETI MALUKU 130 Phase 2 28 28 728 5.4 129.95305 -2.99902 11759 5316040002 WENDEWA BARAT NUSA TENGGARA TIMUR 635 Phase 2 135 94 905 20.5 119.45436 -9.40159 11760 8205020028 SUMBER AGUNG MALUKU UTARA 68 Phase 2 24 24 624 5.0 127.91877 1.26317 11761 5313122008 BANGKA DESE NUSA TENGGARA TIMUR 550 Phase 1 114 96 786 20.9 120.30005 -8.61399 11762 5306050010 BAKUSTULAMA NUSA TENGGARA TIMUR 823 Phase 1 181 127 243 27.5 124.90033 -9.24281 11763 5309061005 SAMASOGE NUSA TENGGARA TIMUR 346 Phase 1 86 73 014 15.8 123.03586 -8.39893 11764 8103143002 KOBISONTA MALUKU 2 806 Phase 2 716 734 616 138.9 129.92696 -2.99091 11765 5316040002 WENDEWA BARAT NUSA TENGGARA TIMUR 786 Phase 2 167 117 401 25.3 119.47826 -9.39261 11766 8205020028 SUMBER AGUNG MALUKU UTARA 339 Phase 2 120 123 120 24.8 127.91448 1.27218 11767 5313122006 NDIWAR NUSA TENGGARA TIMUR 1 068 Phase 1 248 210 552 45.4 120.29310 -8.62042 11768 5304070022 SOPO NUSA TENGGARA TIMUR 886 Phase 1 225 158 175 34.1 124.46009 -9.78917 11769 5308031004 LAMATOKAN NUSA TENGGARA TIMUR 67 Phase 1 18 15 282 3.3 123.54622 -8.26745 11770 8106010012 BUANO UTARA MALUKU 313 Phase 2 79 81 054 15.3 127.90794 -2.92245 11771 5316040002 WENDEWA BARAT NUSA TENGGARA TIMUR 151 Phase 2 32 22 496 4.9 119.50114 -9.39987 11772 8205020025 WARINGIN LAMO MALUKU UTARA 645 Phase 2 216 221 616 44.7 127.89949 1.26443 11773 5313122004 GELONG NUSA TENGGARA TIMUR 127 Phase 1 31 26 319 5.7 120.30312 -8.60283 11774 5304111002 SKINU NUSA TENGGARA TIMUR 577 Phase 1 183 128 649 27.8 124.78300 -9.74616 11775 5308031004 LAMATOKAN NUSA TENGGARA TIMUR 209 Phase 1 56 47 544 10.3 123.54605 -8.26932 11776 8106010012 BUANO UTARA MALUKU 287 Phase 2 73 74 898 14.2 127.90080 -2.92404 11777 5316040002 WENDEWA BARAT NUSA TENGGARA TIMUR 302 Phase 2 64 44 992 9.7 119.50649 -9.39902 11778 8207040009 TOWARA MALUKU UTARA 500 Phase 2 131 134 406 27.1 128.61272 2.56575 11779 5313122007 NATI NUSA TENGGARA TIMUR 694 Phase 1 152 129 048 27.8 120.30446 -8.59325 11780 5304091008 BINENOK NUSA TENGGARA TIMUR 470 Phase 1 124 87 172 18.8 124.61337 -9.93349 11781 5307020021 WOLWAL SELATAN NUSA TENGGARA TIMUR 381 Phase 1 94 79 806 17.2 124.43464 -8.30144 11782 8103041004 MANEORATU MALUKU 289 Phase 2 302 309 852 58.6 129.74514 -3.25675 11783 5316040005 WENDEWA SELATAN NUSA TENGGARA TIMUR 686 Phase 2 201 141 303 30.5 119.54461 -9.40047 11784 8207040008 PANGEO MALUKU UTARA 1 124 Phase 2 300 307 800 62.0 128.60775 2.57097 Annex II – Demand forecast results Page 21 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 11785 5315031003 REHAK NUSA TENGGARA TIMUR 295 Phase 1 66 56 034 12.1 120.28475 -8.63240 11786 5304091008 BINENOK NUSA TENGGARA TIMUR 243 Phase 1 64 44 992 9.7 124.61731 -9.93258 11787 5309071006 LAMAWOLO NUSA TENGGARA TIMUR 122 Phase 1 40 33 960 7.3 123.25066 -8.37640 11788 8103041003 TEHUA MALUKU 2 050 Phase 2 302 309 852 58.6 129.71090 -3.25625 11789 8206011002 SOA GIMALAHA MALUKU UTARA 543 Phase 2 138 141 588 28.5 128.30991 0.66473 11790 5316040007 MANU WOLU NUSA TENGGARA TIMUR 1 089 Phase 2 202 142 006 30.6 119.54719 -9.39295 11791 5315031003 REHAK NUSA TENGGARA TIMUR 246 Phase 1 55 46 695 10.1 120.28314 -8.63508 11792 5304091003 FATUAT NUSA TENGGARA TIMUR 28 Phase 1 7 4 921 1.1 124.62489 -9.93294 11793 5309071007 HELANLANGOWUYO NUSA TENGGARA TIMUR 133 Phase 1 38 32 262 7.0 123.25685 -8.37138 11794 8104023001 ILATH MALUKU 1 519 Phase 2 324 332 424 62.9 127.24771 -3.57957 11795 8201132013 TOGOREBA TUA MALUKU UTARA 829 Phase 2 206 211 356 42.6 127.69437 1.48324 11796 5316040007 MANU WOLU NUSA TENGGARA TIMUR 519 Phase 2 121 85 063 18.4 119.54705 -9.38678 11797 5315031003 REHAK NUSA TENGGARA TIMUR 252 Phase 1 56 47 544 10.3 120.28120 -8.63519 11798 5304091003 FATUAT NUSA TENGGARA TIMUR 883 Phase 1 197 138 491 29.9 124.62626 -9.93069 11799 5309071007 HELANLANGOWUYO NUSA TENGGARA TIMUR 263 Phase 1 74 62 826 13.6 123.25587 -8.36909 11800 8106020019 NENIARI MALUKU 940 Phase 2 205 210 330 39.8 128.21339 -3.07922 11801 8205020025 WARINGIN LAMO MALUKU UTARA 6 Phase 2 3 3 078 0.6 127.89262 1.26872 11802 5316040006 WENDEWA UTARA NUSA TENGGARA TIMUR 1 843 Phase 2 250 175 750 37.9 119.54011 -9.37930 11803 5313041012 TODO NUSA TENGGARA TIMUR 157 Phase 1 43 36 507 7.9 120.37128 -8.73674 11804 5320030012 DEME NUSA TENGGARA TIMUR 689 Phase 1 180 126 540 27.3 121.92335 -10.55928 11805 5309071007 HELANLANGOWUYO NUSA TENGGARA TIMUR 113 Phase 1 32 27 168 5.9 123.26036 -8.37263 11806 8106010010 WAESALA MALUKU 464 Phase 2 106 108 756 20.6 127.98472 -3.08935 11807 8205020025 WARINGIN LAMO MALUKU UTARA 10 Phase 2 4 4 104 0.8 127.89085 1.26648 11808 5316040005 WENDEWA SELATAN NUSA TENGGARA TIMUR 296 Phase 2 87 61 161 13.2 119.54954 -9.40136 11809 5313041013 GULUNG NUSA TENGGARA TIMUR 151 Phase 1 34 28 866 6.2 120.36417 -8.73524 11810 5320050001 BEBAE NUSA TENGGARA TIMUR 860 Phase 1 211 148 333 32.0 121.93830 -10.54048 11811 5308060021 NORMAL I NUSA TENGGARA TIMUR 14 Phase 1 5 4 245 0.9 123.75095 -8.19445 11812 8106021002 IHA MALUKU 951 Phase 2 230 235 980 44.6 127.89997 -3.48266 11813 8205020010 POPON MALUKU UTARA 355 Phase 2 88 90 288 18.2 127.85557 1.25945 11814 5316040008 WENDEWA TIMUR NUSA TENGGARA TIMUR 685 Phase 2 139 97 717 21.1 119.56053 -9.40339 11815 5313041013 GULUNG NUSA TENGGARA TIMUR 233 Phase 1 53 44 997 9.7 120.36370 -8.73312 11816 5320060003 EIADA NUSA TENGGARA TIMUR 716 Phase 1 179 125 837 27.2 121.95314 -10.54775 11817 5308060021 NORMAL I NUSA TENGGARA TIMUR 16 Phase 1 6 5 094 1.1 123.74952 -8.19624 11818 8107020026 URUNG MALUKU 877 Phase 2 195 200 070 37.8 130.80736 -3.86588 11819 8205021003 GAGAAPOK MALUKU UTARA 237 Phase 2 58 59 508 12.0 127.82484 1.26871 11820 5316040008 WENDEWA TIMUR NUSA TENGGARA TIMUR 474 Phase 2 96 67 488 14.6 119.56616 -9.40167 11821 5313041011 RENDA NUSA TENGGARA TIMUR 154 Phase 1 43 36 507 7.9 120.36300 -8.73954 11822 5320050002 TADA NUSA TENGGARA TIMUR 750 Phase 1 180 126 540 27.3 121.93064 -10.52018 11823 5308060008 LEUDANUNG NUSA TENGGARA TIMUR 137 Phase 1 37 31 413 6.8 123.74861 -8.19758 11824 8107020026 URUNG MALUKU 476 Phase 2 106 108 756 20.6 130.85852 -3.86903 11825 8205021002 NGOALI MALUKU UTARA 334 Phase 2 71 72 846 14.7 127.81964 1.26586 11826 5317050010 WEE RENNA NUSA TENGGARA TIMUR 507 Phase 2 112 78 736 17.0 119.23841 -9.45973 11827 5313041011 RENDA NUSA TENGGARA TIMUR 164 Phase 1 45 38 205 8.2 120.35985 -8.73931 11828 5320050003 MATEI NUSA TENGGARA TIMUR 987 Phase 1 222 156 066 33.7 121.94890 -10.51197 11829 5308060021 NORMAL I NUSA TENGGARA TIMUR 70 Phase 1 24 20 376 4.4 123.75132 -8.19780 11830 8107020025 KEFFING MALUKU 405 Phase 2 90 92 340 17.5 130.86475 -3.86385 11831 8205021001 MOMODA MALUKU UTARA 17 Phase 2 7 7 182 1.4 127.81464 1.27097 11832 5317040004 DELO NUSA TENGGARA TIMUR 757 Phase 2 155 108 965 23.5 119.19553 -9.60112 11833 5313041011 RENDA NUSA TENGGARA TIMUR 138 Phase 1 38 32 262 7.0 120.35729 -8.73967 11834 5320050005 LOBOAJU NUSA TENGGARA TIMUR 593 Phase 1 148 104 044 22.4 121.95002 -10.48769 11835 5309062001 KOKOTOBO NUSA TENGGARA TIMUR 406 Phase 1 109 92 541 20.0 123.13787 -8.31954 11836 8205021001 MOMODA MALUKU UTARA 123 Phase 2 47 48 222 9.7 127.81134 1.27406 11837 8107020023 GESER MALUKU 3 434 Phase 2 862 884 412 167.3 130.89873 -3.88580 11838 5317040002 DENDUKA NUSA TENGGARA TIMUR 2 664 Phase 2 507 356 421 76.9 119.16066 -9.63492 11839 5313041011 RENDA NUSA TENGGARA TIMUR 150 Phase 1 42 35 658 7.7 120.35785 -8.74275 11840 5320060004 KEDURU NUSA TENGGARA TIMUR 883 Phase 1 218 153 254 33.1 121.96525 -10.49360 11841 5309061004 TANAH TUKAN NUSA TENGGARA TIMUR 67 Phase 1 18 15 282 3.3 123.02064 -8.38864 11842 8205021019 WONOSARI MALUKU UTARA 214 Phase 2 74 75 924 15.3 127.78521 1.30194 11843 8107020024 KELLU MALUKU 500 Phase 2 132 135 432 25.6 130.91841 -3.89101 11844 5317050002 KALEMBU TILU NUSA TENGGARA TIMUR 545 Phase 2 98 68 894 14.9 119.24229 -9.55772 11845 5313041011 RENDA NUSA TENGGARA TIMUR 250 Phase 1 69 58 581 12.6 120.35735 -8.74656 11846 5320060005 BOLOU NUSA TENGGARA TIMUR 568 Phase 1 146 102 638 22.1 121.97524 -10.49597 11847 5309061004 TANAH TUKAN NUSA TENGGARA TIMUR 122 Phase 1 32 27 168 5.9 123.01754 -8.39005 11848 8205021021 MARGO MULYO MALUKU UTARA 39 Phase 2 13 13 338 2.7 127.79618 1.34719 11849 8107020024 KELLU MALUKU 108 Phase 2 29 29 754 5.6 130.92037 -3.88560 11850 5302051005 HEIKATAPU NUSA TENGGARA TIMUR 1 067 Phase 2 212 149 036 32.2 120.77845 -10.01214 11851 5313041011 RENDA NUSA TENGGARA TIMUR 131 Phase 1 36 30 564 6.6 120.36133 -8.74738 11852 5320060006 LIMAGGU NUSA TENGGARA TIMUR 833 Phase 1 221 155 363 33.5 121.98128 -10.50415 11853 5309061004 TANAH TUKAN NUSA TENGGARA TIMUR 8 Phase 1 3 2 547 0.5 123.01597 -8.38922 11854 8205021021 MARGO MULYO MALUKU UTARA 50 Phase 2 17 17 442 3.5 127.79560 1.34902 11855 8107020022 KILWARU MALUKU 88 Phase 2 23 23 598 4.5 130.92043 -3.88525 11856 5302052015 MUTUNGGEDING NUSA TENGGARA TIMUR 148 Phase 2 21 14 763 3.2 120.65151 -9.88921 11857 5313041011 RENDA NUSA TENGGARA TIMUR 151 Phase 1 42 35 658 7.7 120.36127 -8.74940 11858 5320060007 LOBORAI NUSA TENGGARA TIMUR 561 Phase 1 154 108 262 23.4 121.99049 -10.50709 11859 5309061003 WOTANULUMADO NUSA TENGGARA TIMUR 7 Phase 1 3 2 547 0.5 123.01582 -8.38886 11860 8205021021 MARGO MULYO MALUKU UTARA 336 Phase 2 110 112 860 22.7 127.79691 1.35192 11861 8107020022 KILWARU MALUKU 212 Phase 2 56 57 456 10.9 130.93035 -3.88718 11862 5302052014 WATU HADANG NUSA TENGGARA TIMUR 270 Phase 2 34 23 902 5.2 120.64729 -9.89550 11863 5313130006 BARANG NUSA TENGGARA TIMUR 279 Phase 1 70 59 430 12.8 120.53210 -8.51107 11864 5320050006 JIWUWU NUSA TENGGARA TIMUR 815 Phase 1 188 132 164 28.5 121.95971 -10.46004 11865 5309061003 WOTANULUMADO NUSA TENGGARA TIMUR 15 Phase 1 5 4 245 0.9 123.01404 -8.38973 11866 8205021005 TOLIWANG MALUKU UTARA 757 Phase 2 187 191 862 38.7 127.78892 1.35532 11867 8107020021 KILTAI MALUKU 592 Phase 2 150 153 900 29.1 130.93523 -3.88128 11868 5302052014 WATU HADANG NUSA TENGGARA TIMUR 566 Phase 2 99 69 597 15.0 120.64049 -9.89434 11869 5313041016 KOLE NUSA TENGGARA TIMUR 241 Phase 1 50 42 450 9.2 120.34617 -8.68729 Annex II – Demand forecast results Page 22 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 11870 5320060010 KELIHA NUSA TENGGARA TIMUR 766 Phase 1 185 130 055 28.1 121.97861 -10.45713 11871 5309061003 WOTANULUMADO NUSA TENGGARA TIMUR 279 Phase 1 93 78 957 17.0 123.01361 -8.38724 11872 8205021017 TORAWAT MALUKU UTARA 390 Phase 2 48 49 248 9.9 127.80084 1.36852 11873 8107020022 KILWARU MALUKU 245 Phase 2 64 65 664 12.4 130.93580 -3.88124 11874 5302052014 WATU HADANG NUSA TENGGARA TIMUR 294 Phase 2 52 36 556 7.9 120.63928 -9.89332 11875 5313123001 PONG LENGOR NUSA TENGGARA TIMUR 228 Phase 1 59 50 091 10.8 120.37622 -8.54333 11876 5320060009 KUJIRATU NUSA TENGGARA TIMUR 685 Phase 1 182 127 946 27.6 121.98976 -10.46303 11877 5309061003 WOTANULUMADO NUSA TENGGARA TIMUR 138 Phase 1 46 39 054 8.4 123.01042 -8.38398 11878 8205021020 BERINGIN AGUNG MALUKU UTARA 380 Phase 2 66 67 716 13.6 127.78605 1.37968 11879 8107020022 KILWARU MALUKU 23 Phase 2 6 6 156 1.2 130.93596 -3.89488 11880 5302052014 WATU HADANG NUSA TENGGARA TIMUR 283 Phase 2 50 35 150 7.6 120.63975 -9.89126 11881 5313123001 PONG LENGOR NUSA TENGGARA TIMUR 91 Phase 1 24 20 376 4.4 120.37853 -8.54419 11882 5320060008 BODAE NUSA TENGGARA TIMUR 1 083 Phase 1 272 191 216 41.3 121.99730 -10.47060 11883 5309061004 TANAH TUKAN NUSA TENGGARA TIMUR 16 Phase 1 5 4 245 0.9 123.01415 -8.39014 11884 8205021006 TOLABIT MALUKU UTARA 343 Phase 2 82 84 132 17.0 127.78297 1.38183 11885 8107020022 KILWARU MALUKU 498 Phase 2 130 133 380 25.2 130.94360 -3.89103 11886 5316020004 WAI RASA NUSA TENGGARA TIMUR 185 Phase 2 41 28 823 6.2 119.60257 -9.60555 11887 5313130017 KENTOL NUSA TENGGARA TIMUR 322 Phase 1 96 81 504 17.6 120.48295 -8.46278 11888 5320050007 EILODE NUSA TENGGARA TIMUR 1 086 Phase 1 246 172 938 37.3 121.94210 -10.44985 11889 5309061004 TANAH TUKAN NUSA TENGGARA TIMUR 94 Phase 1 25 21 225 4.6 123.01524 -8.39360 11890 8205021010 LELESANG MALUKU UTARA 261 Phase 2 53 54 378 11.0 127.82300 1.37043 11891 8107020022 KILWARU MALUKU 137 Phase 2 36 36 936 7.0 130.94810 -3.88399 11892 5316020003 UMBU MAMIJUK NUSA TENGGARA TIMUR 912 Phase 2 139 97 717 21.1 119.61868 -9.60964 11893 5313130017 KENTOL NUSA TENGGARA TIMUR 517 Phase 1 153 129 897 28.0 120.48302 -8.45724 11894 5306050012 TUKUNENO NUSA TENGGARA TIMUR 535 Phase 1 130 91 390 19.7 124.86590 -9.12110 11895 5309061004 TANAH TUKAN NUSA TENGGARA TIMUR 92 Phase 1 25 21 225 4.6 123.01326 -8.39554 11896 8205021009 SOA HUKUM MALUKU UTARA 290 Phase 2 61 62 586 12.6 127.81956 1.38596 11897 8107020022 KILWARU MALUKU 403 Phase 2 105 107 730 20.4 130.95309 -3.88635 11898 5316020003 UMBU MAMIJUK NUSA TENGGARA TIMUR 1 245 Phase 2 264 185 592 40.0 119.62333 -9.61053 11899 5319050028 GOLO NDARI NUSA TENGGARA TIMUR 508 Phase 1 134 113 766 24.5 120.55388 -8.50852 11900 5304012004 BONLEU NUSA TENGGARA TIMUR 1 047 Phase 1 265 186 295 40.2 124.28889 -9.58314 11901 5309061003 WOTANULUMADO NUSA TENGGARA TIMUR 93 Phase 1 31 26 319 5.7 123.00929 -8.37985 11902 8205021004 MAKARTI MALUKU UTARA 524 Phase 2 157 161 082 32.5 127.80618 1.39262 11903 8106030028 URAUR MALUKU 163 Phase 2 35 35 910 6.8 128.39411 -3.31881 11904 5317060002 DIKIRA NUSA TENGGARA TIMUR 1 413 Phase 2 247 173 641 37.5 119.27269 -9.61999 11905 5313130016 LANGKAS NUSA TENGGARA TIMUR 62 Phase 1 17 14 433 3.1 120.49141 -8.46086 11906 5306010009 RABASA NUSA TENGGARA TIMUR 23 Phase 1 7 4 921 1.1 124.88246 -9.66961 11907 5309061001 WAILEBE NUSA TENGGARA TIMUR 191 Phase 1 56 47 544 10.3 123.00067 -8.36948 11908 8205021007 TUGUIS MALUKU UTARA 362 Phase 2 88 90 288 18.2 127.83699 1.41004 11909 8106030021 HATUSUA MALUKU 225 Phase 2 65 66 690 12.6 128.37210 -3.29873 11910 5302052014 WATU HADANG NUSA TENGGARA TIMUR 163 Phase 2 29 20 387 4.4 120.63819 -9.90169 11911 5313130016 LANGKAS NUSA TENGGARA TIMUR 252 Phase 1 67 56 883 12.3 120.49886 -8.45757 11912 5306010019 LOOFOUN NUSA TENGGARA TIMUR 17 Phase 1 6 4 218 0.9 124.88212 -9.66909 11913 5309061001 WAILEBE NUSA TENGGARA TIMUR 106 Phase 1 31 26 319 5.7 123.00780 -8.35685 11914 8205021015 PARSEBA MALUKU UTARA 337 Phase 2 77 79 002 15.9 127.83461 1.41621 11915 8106030020 WAIMITAL MALUKU 895 Phase 2 192 196 992 37.3 128.37429 -3.29627 11916 5302052014 WATU HADANG NUSA TENGGARA TIMUR 86 Phase 2 16 11 248 2.4 120.63924 -9.90243 11917 5313130016 LANGKAS NUSA TENGGARA TIMUR 185 Phase 1 49 41 601 9.0 120.50101 -8.45693 11918 5306010009 RABASA NUSA TENGGARA TIMUR 40 Phase 1 13 9 139 2.0 124.87337 -9.66773 11919 5309061002 TOBILOTA NUSA TENGGARA TIMUR 567 Phase 1 137 116 313 25.1 123.00727 -8.35568 11920 8205021013 SOAMAETEK MALUKU UTARA 859 Phase 2 189 193 914 39.1 127.83621 1.42448 11921 8107040007 HOTE MALUKU 182 Phase 2 47 48 222 9.1 130.39489 -3.06118 11922 5302052004 WATU PUDA NUSA TENGGARA TIMUR 1 357 Phase 2 264 185 592 40.0 120.62868 -9.90151 11923 5313130015 LANDO NUSA TENGGARA TIMUR 392 Phase 1 93 78 957 17.0 120.50951 -8.45929 11924 5306010009 RABASA NUSA TENGGARA TIMUR 23 Phase 1 7 4 921 1.1 124.87236 -9.66584 11925 5309061003 WOTANULUMADO NUSA TENGGARA TIMUR 26 Phase 1 9 7 641 1.6 123.01167 -8.39092 11926 8205021014 BAILENGIT MALUKU UTARA 539 Phase 2 115 117 990 23.8 127.83860 1.43162 11927 8107040014 UPT Y JEMBATAN BASAH MALUKU 306 Phase 2 95 97 470 18.4 130.39477 -3.06294 11928 5302052003 LAIRURU NUSA TENGGARA TIMUR 1 124 Phase 2 184 129 352 27.9 120.62224 -9.89180 11929 5313130014 BEA MESE NUSA TENGGARA TIMUR 119 Phase 1 28 23 772 5.1 120.50861 -8.46303 11930 5306013003 HAUKLARAN NUSA TENGGARA TIMUR 1 202 Phase 1 300 210 900 45.5 124.87303 -9.65952 11931 5309061004 TANAH TUKAN NUSA TENGGARA TIMUR 51 Phase 1 14 11 886 2.6 123.01179 -8.39139 11932 8205021012 PITAGO MALUKU UTARA 420 Phase 2 110 112 860 22.7 127.84213 1.43201 11933 8107040014 UPT Y JEMBATAN BASAH MALUKU 65 Phase 2 21 21 546 4.1 130.39261 -3.06430 11934 5317050013 WATU KAWULA NUSA TENGGARA TIMUR 307 Phase 2 58 40 774 8.8 119.20898 -9.45254 11935 5313130014 BEA MESE NUSA TENGGARA TIMUR 189 Phase 1 44 37 356 8.1 120.51190 -8.46560 11936 5306013003 HAUKLARAN NUSA TENGGARA TIMUR 21 Phase 1 6 4 218 0.9 124.87515 -9.65691 11937 5310040022 WAILAMUNG NUSA TENGGARA TIMUR 383 Phase 1 98 83 202 18.0 122.56385 -8.44666 11938 8205020008 SASUR MALUKU UTARA 340 Phase 2 99 101 574 20.5 127.85908 1.23702 11939 8107040015 UPT Z JEMBATAN BASAH MALUKU 598 Phase 2 149 152 874 28.9 130.39108 -3.06717 11940 5317050013 WATU KAWULA NUSA TENGGARA TIMUR 579 Phase 2 109 76 627 16.5 119.19780 -9.45155 11941 5313130014 BEA MESE NUSA TENGGARA TIMUR 106 Phase 1 25 21 225 4.6 120.51375 -8.46593 11942 5306013008 LAKULO NUSA TENGGARA TIMUR 57 Phase 1 12 8 436 1.8 124.87850 -9.65250 11943 5310040022 WAILAMUNG NUSA TENGGARA TIMUR 194 Phase 1 50 42 450 9.2 122.58186 -8.43211 11944 8204040013 BORI MALUKU UTARA 1 056 Phase 2 256 262 656 52.9 127.62113 -0.56095 11945 8106020020 PIRU MALUKU 219 Phase 2 69 70 794 13.4 128.23337 -3.08157 11946 5302051004 KABARU NUSA TENGGARA TIMUR 814 Phase 2 192 134 976 29.1 120.79728 -10.03383 11947 5313130014 BEA MESE NUSA TENGGARA TIMUR 540 Phase 1 126 106 974 23.1 120.51513 -8.46478 11948 5306013008 LAKULO NUSA TENGGARA TIMUR 308 Phase 1 65 45 695 9.9 124.87635 -9.64816 11949 5310040022 WAILAMUNG NUSA TENGGARA TIMUR 483 Phase 1 123 104 427 22.5 122.59019 -8.42702 11950 8203061009 AIR BULAN MALUKU UTARA 224 Phase 2 44 45 144 9.1 124.56693 -1.66316 11951 8106020017 LUMOLI MALUKU 168 Phase 2 34 34 884 6.6 128.23427 -3.08134 11952 5317060001 DANGGA MANGO NUSA TENGGARA TIMUR 1 457 Phase 2 267 187 701 40.5 119.26470 -9.65943 11953 5313130014 BEA MESE NUSA TENGGARA TIMUR 246 Phase 1 57 48 393 10.4 120.51325 -8.46897 11954 5306013008 LAKULO NUSA TENGGARA TIMUR 787 Phase 1 165 115 995 25.0 124.86736 -9.65029 Annex II – Demand forecast results Page 23 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 11955 5310040023 LEWOMADA NUSA TENGGARA TIMUR 553 Phase 1 135 114 615 24.7 122.61291 -8.40571 11956 8203061007 NUNCA MALUKU UTARA 625 Phase 2 127 130 302 26.3 124.59111 -1.64401 11957 8106020017 LUMOLI MALUKU 835 Phase 2 168 172 368 32.6 128.24605 -3.09546 11958 5302051006 TANARAING NUSA TENGGARA TIMUR 179 Phase 2 40 28 120 6.1 120.75776 -9.98146 11959 5313130013 PERAK NUSA TENGGARA TIMUR 157 Phase 1 39 33 111 7.1 120.51218 -8.47501 11960 5306013008 LAKULO NUSA TENGGARA TIMUR 467 Phase 1 98 68 894 14.9 124.86740 -9.64521 11961 5310040023 LEWOMADA NUSA TENGGARA TIMUR 15 Phase 1 4 3 396 0.7 122.61828 -8.38787 11962 8203061002 MINTON MALUKU UTARA 714 Phase 2 139 142 614 28.7 124.69388 -1.65323 11963 8106020018 MOREKAU MALUKU 648 Phase 2 150 153 900 29.1 128.23572 -3.06133 11964 5302051006 TANARAING NUSA TENGGARA TIMUR 751 Phase 2 182 127 946 27.6 120.76443 -9.98720 11965 5313130013 PERAK NUSA TENGGARA TIMUR 108 Phase 1 27 22 923 4.9 120.51218 -8.47804 11966 5306010019 LOOFOUN NUSA TENGGARA TIMUR 138 Phase 1 42 29 526 6.4 124.88244 -9.65778 11967 5310040023 LEWOMADA NUSA TENGGARA TIMUR 31 Phase 1 8 6 792 1.5 122.61788 -8.38734 11968 8203061006 GELA MALUKU UTARA 1 225 Phase 2 274 281 124 56.6 124.70964 -1.65741 11969 8106020016 ETTY MALUKU 333 Phase 2 83 85 158 16.1 128.07425 -3.02266 11970 5301022005 BALI LOKU NUSA TENGGARA TIMUR 1 305 Phase 2 261 183 483 39.6 119.49643 -9.73549 11971 5313130013 PERAK NUSA TENGGARA TIMUR 735 Phase 1 183 155 367 33.5 120.51222 -8.48192 11972 5306010019 LOOFOUN NUSA TENGGARA TIMUR 556 Phase 1 168 118 104 25.5 124.88697 -9.66147 11973 5310040023 LEWOMADA NUSA TENGGARA TIMUR 47 Phase 1 12 10 188 2.2 122.61882 -8.38690 11974 8203061014 DEGE MALUKU UTARA 246 Phase 2 50 51 300 10.3 124.74807 -1.67033 11975 8104021012 LELE MALUKU 1 649 Phase 2 282 289 332 54.7 126.88297 -3.49536 11976 5301022006 HUPU MADA NUSA TENGGARA TIMUR 1 406 Phase 2 275 193 325 41.7 119.49601 -9.69798 11977 5313130013 PERAK NUSA TENGGARA TIMUR 213 Phase 1 53 44 997 9.7 120.50867 -8.47537 11978 5304100016 SUNU NUSA TENGGARA TIMUR 13 Phase 1 4 2 812 0.6 124.63662 -9.82960 11979 5310040023 LEWOMADA NUSA TENGGARA TIMUR 120 Phase 1 30 25 470 5.5 122.64937 -8.38774 11980 8203061013 HAI MALUKU UTARA 144 Phase 2 39 40 014 8.1 124.77585 -1.67055 11981 8104021012 LELE MALUKU 290 Phase 2 50 51 300 9.7 126.89345 -3.51247 11982 5316020006 ANAJIAKA NUSA TENGGARA TIMUR 155 Phase 2 34 23 902 5.2 119.58865 -9.57960 11983 5319050017 COMPANG LAHO NUSA TENGGARA TIMUR 22 Phase 1 6 5 094 1.1 120.55257 -8.54002 11984 5304100016 SUNU NUSA TENGGARA TIMUR 77 Phase 1 23 16 169 3.5 124.63761 -9.82851 11985 5310040023 LEWOMADA NUSA TENGGARA TIMUR 650 Phase 1 158 134 142 28.9 122.66703 -8.39076 11986 8203061010 AIR KALIMAT MALUKU UTARA 288 Phase 2 75 76 950 15.5 124.79987 -1.68407 11987 8104021012 LELE MALUKU 231 Phase 2 40 41 040 7.8 126.89268 -3.51634 11988 5316020005 UMBU KAWOLU NUSA TENGGARA TIMUR 924 Phase 2 274 192 622 41.6 119.61611 -9.57544 11989 5319050017 COMPANG LAHO NUSA TENGGARA TIMUR 325 Phase 1 76 64 524 13.9 120.55315 -8.54468 11990 5304100016 SUNU NUSA TENGGARA TIMUR 294 Phase 1 87 61 161 13.2 124.63948 -9.82364 11991 5310040023 LEWOMADA NUSA TENGGARA TIMUR 149 Phase 1 37 31 413 6.8 122.67155 -8.38896 11992 8203061003 JORJOGA MALUKU UTARA 1 228 Phase 2 281 288 306 58.1 124.80755 -1.68008 11993 8109040003 WAELIKUT MALUKU 126 Phase 2 26 26 676 5.0 126.89420 -3.51760 11994 5316011002 MANURARA NUSA TENGGARA TIMUR 953 Phase 2 179 125 837 27.2 119.52083 -9.69370 11995 5319050017 COMPANG LAHO NUSA TENGGARA TIMUR 148 Phase 1 35 29 715 6.4 120.55041 -8.54570 11996 5304100016 SUNU NUSA TENGGARA TIMUR 35 Phase 1 11 7 733 1.7 124.64123 -9.81969 11997 5309011001 ADABANG NUSA TENGGARA TIMUR 132 Phase 1 41 34 809 7.5 122.69032 -8.38256 11998 8203061005 TANJUNG UNA MALUKU UTARA 971 Phase 2 189 193 914 39.1 124.82678 -1.68261 11999 8109040003 WAELIKUT MALUKU 369 Phase 2 74 75 924 14.4 126.89272 -3.51985 12000 5316020006 ANAJIAKA NUSA TENGGARA TIMUR 341 Phase 2 74 52 022 11.2 119.58402 -9.57411 12001 5311041004 ROGA NUSA TENGGARA TIMUR 345 Phase 1 107 90 843 19.6 121.78678 -8.80765 12002 5304103004 MELLA NUSA TENGGARA TIMUR 710 Phase 1 208 146 224 31.6 124.64295 -9.80741 12003 5309011001 ADABANG NUSA TENGGARA TIMUR 134 Phase 1 42 35 658 7.7 122.70920 -8.37536 12004 8205021011 KAI MALUKU UTARA 532 Phase 2 121 124 146 25.0 127.84892 1.46058 12005 8106021003 LUHU MALUKU 785 Phase 2 129 132 354 25.0 127.97383 -3.41091 12006 5317060014 TANGGABA NUSA TENGGARA TIMUR 620 Phase 2 114 80 142 17.3 119.31395 -9.51479 12007 5313122001 URANG NUSA TENGGARA TIMUR 285 Phase 1 60 50 940 11.0 120.28907 -8.65258 12008 5304103001 SUNI NUSA TENGGARA TIMUR 277 Phase 1 90 63 270 13.7 124.65395 -9.80026 12009 5309011001 ADABANG NUSA TENGGARA TIMUR 471 Phase 1 145 123 105 26.6 122.70958 -8.37428 12010 8204030046 AWANGGOA MALUKU UTARA 268 Phase 2 72 73 872 14.9 127.45854 -0.62926 12011 8104021014 WAENETAT MALUKU 534 Phase 2 150 153 900 29.1 126.98665 -3.37237 12012 5316020006 ANAJIAKA NUSA TENGGARA TIMUR 175 Phase 2 38 26 714 5.8 119.58659 -9.56764 12013 5315030021 PONDO NUSA TENGGARA TIMUR 169 Phase 1 38 32 262 7.0 120.27926 -8.65382 12014 5304103004 MELLA NUSA TENGGARA TIMUR 37 Phase 1 11 7 733 1.7 124.65434 -9.79881 12015 5309011002 KOBASOMA NUSA TENGGARA TIMUR 714 Phase 1 168 142 632 30.8 122.73377 -8.38123 12016 8204030038 INDOMUT MALUKU UTARA 645 Phase 2 144 147 744 29.8 127.43705 -0.62255 12017 8104021014 WAENETAT MALUKU 17 Phase 2 5 5 130 1.0 126.98343 -3.37842 12018 5316020009 PRAI MADETA NUSA TENGGARA TIMUR 532 Phase 2 146 102 638 22.1 119.59842 -9.53147 12019 5315030021 PONDO NUSA TENGGARA TIMUR 120 Phase 1 27 22 923 4.9 120.27622 -8.65203 12020 5304103001 SUNI NUSA TENGGARA TIMUR 100 Phase 1 33 23 199 5.0 124.65467 -9.79854 12021 5309011010 WATOWARA NUSA TENGGARA TIMUR 925 Phase 2 256 217 344 46.9 122.75969 -8.36928 12022 8204034005 BAJO MALUKU UTARA 144 Phase 2 36 36 936 7.4 127.42292 -0.64280 12023 8104021014 WAENETAT MALUKU 531 Phase 2 149 152 874 28.9 126.97536 -3.38323 12024 5316020009 PRAI MADETA NUSA TENGGARA TIMUR 159 Phase 2 44 30 932 6.7 119.59237 -9.52526 12025 5315030021 PONDO NUSA TENGGARA TIMUR 216 Phase 1 48 40 752 8.8 120.27077 -8.65068 12026 5304103001 SUNI NUSA TENGGARA TIMUR 329 Phase 1 107 75 221 16.2 124.65823 -9.79595 12027 5309011003 TENAWAHANG NUSA TENGGARA TIMUR 590 Phase 2 142 120 558 26.0 122.77587 -8.39875 12028 8204034004 TANJUNG OBIT MALUKU UTARA 301 Phase 2 83 85 158 17.2 127.41213 -0.65123 12029 8103143003 SETI MALUKU 190 Phase 2 41 42 066 8.0 129.90781 -2.96494 12030 5316020009 PRAI MADETA NUSA TENGGARA TIMUR 229 Phase 2 63 44 289 9.6 119.58835 -9.52474 12031 5315030021 PONDO NUSA TENGGARA TIMUR 232 Phase 1 52 44 148 9.5 120.26792 -8.65038 12032 5304100017 LANU NUSA TENGGARA TIMUR 266 Phase 1 77 54 131 11.7 124.64906 -9.82354 12033 5309011005 ILE GERONG NUSA TENGGARA TIMUR 218 Phase 2 56 47 544 10.3 122.77782 -8.40968 12034 8204034003 PARAPAKANDA MALUKU UTARA 896 Phase 2 208 213 408 43.0 127.39604 -0.65486 12035 8103142006 WAITONIPA MALUKU 766 Phase 2 241 247 266 46.8 129.88160 -2.98660 12036 5316020008 MADERI NUSA TENGGARA TIMUR 1 991 Phase 3 408 286 824 61.9 119.58545 -9.51932 12037 5315030021 PONDO NUSA TENGGARA TIMUR 341 Phase 1 76 64 524 13.9 120.26355 -8.65261 12038 5304100016 SUNU NUSA TENGGARA TIMUR 563 Phase 1 167 117 401 25.3 124.65096 -9.81809 12039 5309011013 BOKANG WOLOMATANG NUSA TENGGARA TIMUR 390 Phase 2 97 82 353 17.8 122.77868 -8.41217 Annex II – Demand forecast results Page 24 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 12040 8202031006 SUMBER SARI MALUKU UTARA 424 Phase 2 109 111 834 22.5 127.84447 0.13910 12041 8103142007 MOROKAY MALUKU 1 285 Phase 2 355 364 230 68.9 129.86423 -2.97880 12042 5316020007 PONDOK NUSA TENGGARA TIMUR 1 860 Phase 3 460 323 380 69.8 119.55571 -9.49559 12043 5315030021 PONDO NUSA TENGGARA TIMUR 552 Phase 1 123 104 427 22.5 120.25391 -8.65760 12044 5304110007 NASI NUSA TENGGARA TIMUR 230 Phase 1 64 44 992 9.7 124.67697 -9.72050 12045 5309011005 ILE GERONG NUSA TENGGARA TIMUR 314 Phase 2 80 67 920 14.7 122.78709 -8.40909 12046 8202033005 WOEKOBE MALUKU UTARA 436 Phase 2 125 128 250 25.8 127.88452 0.52194 12047 8103142008 WAIMUSI MALUKU 1 151 Phase 2 304 311 904 59.0 129.83462 -2.99539 12048 5316040004 CENDANA NUSA TENGGARA TIMUR 1 989 Phase 3 428 300 884 64.9 119.55438 -9.49078 12049 5315030020 WAE KANTA NUSA TENGGARA TIMUR 588 Phase 1 128 108 672 23.4 120.26662 -8.66287 12050 5304110007 NASI NUSA TENGGARA TIMUR 25 Phase 1 7 4 921 1.1 124.67862 -9.72213 12051 5309011008 TUAKEPA NUSA TENGGARA TIMUR 789 Phase 2 215 182 535 39.4 122.78917 -8.39932 12052 8202033006 WOEJERANA MALUKU UTARA 335 Phase 2 88 90 288 18.2 127.88592 0.53803 12053 8103142009 WAIASIH MALUKU 296 Phase 2 75 76 950 14.6 129.81820 -2.99431 12054 5302031012 ANANJAKI NUSA TENGGARA TIMUR 289 Phase 3 30 21 090 4.6 120.22030 -10.20487 12055 5315030020 WAE KANTA NUSA TENGGARA TIMUR 272 Phase 1 60 50 940 11.0 120.27074 -8.66451 12056 5304110007 NASI NUSA TENGGARA TIMUR 221 Phase 1 61 42 883 9.3 124.68358 -9.72098 12057 5309011008 TUAKEPA NUSA TENGGARA TIMUR 174 Phase 2 48 40 752 8.8 122.81094 -8.39348 12058 8202033007 KULOJAYA MALUKU UTARA 178 Phase 2 77 79 002 15.9 127.87320 0.54879 12059 8103142009 WAIASIH MALUKU 403 Phase 2 101 103 626 19.6 129.80964 -2.99086 12060 5302031012 ANANJAKI NUSA TENGGARA TIMUR 437 Phase 3 99 69 597 15.0 120.21032 -10.19980 12061 5315030020 WAE KANTA NUSA TENGGARA TIMUR 100 Phase 1 22 18 678 4.0 120.26978 -8.66909 12062 5304110006 FATILO NUSA TENGGARA TIMUR 69 Phase 1 17 11 951 2.6 124.68827 -9.71971 12063 5309011008 TUAKEPA NUSA TENGGARA TIMUR 153 Phase 2 42 35 658 7.7 122.81253 -8.38955 12064 8202033007 KULOJAYA MALUKU UTARA 68 Phase 2 30 30 780 6.2 127.87423 0.55145 12065 8106010010 WAESALA MALUKU 456 Phase 2 104 106 704 20.2 127.91520 -3.29196 12066 5302031002 PRAIMADITA NUSA TENGGARA TIMUR 558 Phase 3 106 74 518 16.1 120.19583 -10.20952 12067 5315030016 PONG MAJOK NUSA TENGGARA TIMUR 156 Phase 1 33 28 017 6.0 120.26685 -8.67630 12068 5304110006 FATILO NUSA TENGGARA TIMUR 329 Phase 1 77 54 131 11.7 124.69431 -9.72353 12069 5309011007 LEWOINGU NUSA TENGGARA TIMUR 417 Phase 2 111 94 239 20.3 122.81421 -8.39034 12070 8203061004 MANANGA MALUKU UTARA 723 Phase 2 160 164 160 33.1 124.86710 -1.68316 12071 8106020016 ETTY MALUKU 1 066 Phase 2 265 271 890 51.4 128.22463 -3.09636 12072 5302031002 PRAIMADITA NUSA TENGGARA TIMUR 342 Phase 3 84 59 052 12.7 120.18738 -10.20642 12073 5315030016 PONG MAJOK NUSA TENGGARA TIMUR 475 Phase 1 99 84 051 18.1 120.26454 -8.67509 12074 5304110006 FATILO NUSA TENGGARA TIMUR 830 Phase 1 193 135 679 29.3 124.69395 -9.73737 12075 5309011009 LERABOLENG NUSA TENGGARA TIMUR 1 306 Phase 2 344 292 056 63.0 122.81459 -8.38889 12076 8201091015 TABADAMAI MALUKU UTARA 669 Phase 2 156 160 056 32.2 127.64446 0.78382 12077 8104021014 WAENETAT MALUKU 24 Phase 2 7 7 182 1.4 126.99040 -3.37333 12078 5302031002 PRAIMADITA NUSA TENGGARA TIMUR 549 Phase 3 134 94 202 20.3 120.17883 -10.19758 12079 5312030021 WERE III NUSA TENGGARA TIMUR 115 Phase 1 26 22 074 4.8 121.12595 -8.89485 12080 5304110006 FATILO NUSA TENGGARA TIMUR 395 Phase 1 92 64 676 14.0 124.70367 -9.74597 12081 5309011004 KONGA NUSA TENGGARA TIMUR 101 Phase 2 23 19 527 4.2 122.76908 -8.43004 12082 8204030039 BELANG BELANG MALUKU UTARA 519 Phase 2 131 134 406 27.1 127.42461 -0.60773 12083 8104021014 WAENETAT MALUKU 16 Phase 2 5 5 130 1.0 126.99310 -3.37264 12084 5316011001 WAI MANU NUSA TENGGARA TIMUR 1 033 Phase 3 201 141 303 30.5 119.53500 -9.68053 12085 5312030021 WERE III NUSA TENGGARA TIMUR 227 Phase 1 50 42 450 9.2 121.12534 -8.90221 12086 5304110006 FATILO NUSA TENGGARA TIMUR 156 Phase 1 37 26 011 5.6 124.70661 -9.74615 12087 5309011003 TENAWAHANG NUSA TENGGARA TIMUR 500 Phase 2 121 102 729 22.2 122.76767 -8.43041 12088 8207040008 PANGEO MALUKU UTARA 593 Phase 2 159 163 134 32.9 128.60639 2.57913 12089 8104021014 WAENETAT MALUKU 122 Phase 2 35 35 910 6.8 126.99658 -3.36903 12090 5317040003 BONDO BELA NUSA TENGGARA TIMUR 1 088 Phase 3 213 149 739 32.3 119.20986 -9.64840 12091 5312030021 WERE III NUSA TENGGARA TIMUR 45 Phase 1 10 8 490 1.8 121.12491 -8.90230 12092 5304104003 POLI NUSA TENGGARA TIMUR 158 Phase 1 43 30 229 6.5 124.70821 -9.75669 12093 5309011004 KONGA NUSA TENGGARA TIMUR 102 Phase 2 24 20 376 4.4 122.77371 -8.43951 12094 8204034005 BAJO MALUKU UTARA 2 079 Phase 2 514 527 364 106.3 127.39376 -0.62013 12095 8104021014 WAENETAT MALUKU 144 Phase 2 41 42 066 8.0 127.00174 -3.36659 12096 5301023001 WETANA NUSA TENGGARA TIMUR 2 045 Phase 3 434 305 102 65.8 119.19255 -9.70463 12097 5312030021 WERE III NUSA TENGGARA TIMUR 858 Phase 1 189 160 461 34.6 121.12067 -8.90918 12098 5304104003 POLI NUSA TENGGARA TIMUR 438 Phase 1 119 83 657 18.1 124.69888 -9.75948 12099 5309011004 KONGA NUSA TENGGARA TIMUR 386 Phase 2 88 74 712 16.1 122.77548 -8.45093 12100 8203032001 KAWATA MALUKU UTARA 1 264 Phase 2 215 220 590 44.4 126.16431 -1.88374 12101 8104021014 WAENETAT MALUKU 13 Phase 2 4 4 104 0.8 127.00864 -3.36561 12102 5317080009 TOTOK NUSA TENGGARA TIMUR 354 Phase 3 78 54 834 11.8 119.30438 -9.46715 12103 5313130016 LANGKAS NUSA TENGGARA TIMUR 381 Phase 1 101 85 749 18.5 120.49751 -8.44632 12104 5304104003 POLI NUSA TENGGARA TIMUR 1 060 Phase 1 287 201 761 43.5 124.69927 -9.77442 12105 5309012005 NOBOKONGA NUSA TENGGARA TIMUR 1 823 Phase 2 371 314 979 68.0 122.78370 -8.47230 12106 8201091006 AKEARA MALUKU UTARA 154 Phase 2 38 38 988 7.9 127.60074 0.90456 12107 8104021014 WAENETAT MALUKU 15 Phase 2 5 5 130 1.0 127.01277 -3.37316 12108 5316011006 TANA MODU NUSA TENGGARA TIMUR 1 269 Phase 3 250 175 750 37.9 119.58229 -9.67935 12109 5313130021 RIUNG NUSA TENGGARA TIMUR 74 Phase 1 15 12 735 2.7 120.48985 -8.43905 12110 5320050004 EIMMADAKE NUSA TENGGARA TIMUR 1 098 Phase 1 232 163 096 35.2 121.92774 -10.48825 12111 5307060025 ALILA SELATAN NUSA TENGGARA TIMUR 45 Phase 2 12 10 188 2.2 124.51769 -8.16984 12112 8203030009 NAFLOW MALUKU UTARA 81 Phase 2 16 16 416 3.3 126.03311 -1.88462 12113 8104021010 DEBOWAE MALUKU 2 Phase 2 1 1 026 0.2 127.01302 -3.37363 12114 5316011007 KONDA MALOBA NUSA TENGGARA TIMUR 2 687 Phase 3 568 399 304 86.2 119.66017 -9.73799 12115 5313130021 RIUNG NUSA TENGGARA TIMUR 229 Phase 1 47 39 903 8.6 120.48527 -8.44289 12116 5305021001 KIUOLA NUSA TENGGARA TIMUR 846 Phase 1 224 157 472 34.0 124.45874 -9.58840 12117 5307060025 ALILA SELATAN NUSA TENGGARA TIMUR 115 Phase 2 30 25 470 5.5 124.50881 -8.17400 12118 8203030007 KOW MALUKU UTARA 191 Phase 2 40 41 040 8.3 126.03507 -1.87161 12119 8104021010 DEBOWAE MALUKU 1 969 Phase 2 539 553 014 104.6 127.01782 -3.40286 12120 5317030012 KALEMBU KAHA NUSA TENGGARA TIMUR 196 Phase 3 39 27 417 5.9 119.12174 -9.45799 12121 5313130021 RIUNG NUSA TENGGARA TIMUR 541 Phase 1 110 93 390 20.2 120.47890 -8.44417 12122 5306031005 NAEKEKUSA NUSA TENGGARA TIMUR 381 Phase 1 103 72 409 15.6 124.89361 -9.44230 12123 5307060025 ALILA SELATAN NUSA TENGGARA TIMUR 379 Phase 2 99 84 051 18.1 124.50753 -8.16772 12124 8203030009 NAFLOW MALUKU UTARA 126 Phase 2 24 24 624 5.0 126.03435 -1.87085 Annex II – Demand forecast results Page 25 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 12125 8104021005 PARBULU MALUKU 2 426 Phase 2 670 687 420 130.0 127.01078 -3.43423 12126 5317030012 KALEMBU KAHA NUSA TENGGARA TIMUR 304 Phase 3 60 42 180 9.1 119.12399 -9.45794 12127 5313130021 RIUNG NUSA TENGGARA TIMUR 607 Phase 1 123 104 427 22.5 120.47361 -8.44686 12128 5304042005 NAUKAE NUSA TENGGARA TIMUR 204 Phase 1 55 38 665 8.3 124.43298 -9.82880 12129 5307060024 OTVAI NUSA TENGGARA TIMUR 67 Phase 2 20 16 980 3.7 124.51031 -8.17796 12130 8203030007 KOW MALUKU UTARA 270 Phase 2 56 57 456 11.6 126.04312 -1.86238 12131 8104021013 WAEGEREN MALUKU 430 Phase 2 106 108 756 20.6 126.91155 -3.40364 12132 5302032006 KATIKU LUKU NUSA TENGGARA TIMUR 387 Phase 3 99 69 597 15.0 120.33176 -9.98668 12133 5313130023 WAE RENCA NUSA TENGGARA TIMUR 121 Phase 1 28 23 772 5.1 120.46615 -8.43663 12134 5304042003 TETAF NUSA TENGGARA TIMUR 204 Phase 1 49 34 447 7.4 124.43196 -9.82846 12135 5307060024 OTVAI NUSA TENGGARA TIMUR 69 Phase 2 20 16 980 3.7 124.50525 -8.17879 12136 8202043004 MASURE MALUKU UTARA 647 Phase 2 151 154 926 31.2 128.67917 0.38839 12137 8107040007 HOTE MALUKU 41 Phase 2 11 11 286 2.1 130.39112 -3.06306 12138 5302011007 PRAI KARANG NUSA TENGGARA TIMUR 1 022 Phase 3 221 155 363 33.5 120.02714 -9.69090 12139 5313130023 WAE RENCA NUSA TENGGARA TIMUR 445 Phase 1 100 84 900 18.3 120.45923 -8.43212 12140 5304042005 NAUKAE NUSA TENGGARA TIMUR 168 Phase 1 45 31 635 6.8 124.43147 -9.82440 12141 5307060024 OTVAI NUSA TENGGARA TIMUR 96 Phase 2 28 23 772 5.1 124.49374 -8.18453 12142 8202043003 PENITI MALUKU UTARA 681 Phase 2 127 130 302 26.3 128.68134 0.39575 12143 8103141004 LATEA MALUKU 333 Phase 2 87 89 262 16.9 128.96898 -2.83814 12144 5302011008 PRAI PAHA NUSA TENGGARA TIMUR 570 Phase 3 131 92 093 19.9 119.99133 -9.67695 12145 5313130023 WAE RENCA NUSA TENGGARA TIMUR 189 Phase 1 43 36 507 7.9 120.46028 -8.44052 12146 5304042005 NAUKAE NUSA TENGGARA TIMUR 130 Phase 1 35 24 605 5.3 124.42736 -9.81953 12147 5307060024 OTVAI NUSA TENGGARA TIMUR 114 Phase 2 33 28 017 6.0 124.49536 -8.18848 12148 8202044001 BOBANE INDAH MALUKU UTARA 822 Phase 2 175 179 550 36.2 128.57716 0.31905 12149 8103141005 GALE-GALE MALUKU 1 475 Phase 2 386 396 036 74.9 129.00633 -2.81709 12150 5302011008 PRAI PAHA NUSA TENGGARA TIMUR 547 Phase 3 126 88 578 19.1 119.98158 -9.67859 12151 5313130023 WAE RENCA NUSA TENGGARA TIMUR 272 Phase 1 62 52 638 11.4 120.46080 -8.44352 12152 5304042005 NAUKAE NUSA TENGGARA TIMUR 164 Phase 1 44 30 932 6.7 124.42677 -9.81805 12153 5307060024 OTVAI NUSA TENGGARA TIMUR 123 Phase 2 35 29 715 6.4 124.50097 -8.19327 12154 8202044002 BANEMO MALUKU UTARA 621 Phase 2 175 179 550 36.2 128.57136 0.32030 12155 8103142003 MANEO RENDAH MALUKU 49 Phase 2 15 15 390 2.9 129.83565 -2.99784 12156 5302011008 PRAI PAHA NUSA TENGGARA TIMUR 328 Phase 3 75 52 725 11.4 119.98038 -9.67787 12157 5313130023 WAE RENCA NUSA TENGGARA TIMUR 234 Phase 1 53 44 997 9.7 120.46006 -8.44756 12158 5304042005 NAUKAE NUSA TENGGARA TIMUR 95 Phase 1 26 18 278 3.9 124.42863 -9.81715 12159 5307060024 OTVAI NUSA TENGGARA TIMUR 624 Phase 2 178 151 122 32.6 124.50161 -8.19635 12160 8202044003 BOBANE JAYA MALUKU UTARA 1 155 Phase 2 261 267 786 54.0 128.56849 0.32025 12161 8107020051 KILGA WATUBAU MALUKU 893 Phase 2 302 309 852 58.6 130.81137 -3.65187 12162 5302031002 PRAIMADITA NUSA TENGGARA TIMUR 195 Phase 3 48 33 744 7.3 120.19642 -10.21817 12163 5313130023 WAE RENCA NUSA TENGGARA TIMUR 378 Phase 1 85 72 165 15.6 120.45030 -8.44108 12164 5304072004 HOI NUSA TENGGARA TIMUR 340 Phase 1 89 62 567 13.5 124.43786 -9.81300 12165 5307060025 ALILA SELATAN NUSA TENGGARA TIMUR 100 Phase 2 27 22 923 4.9 124.50812 -8.16414 12166 8203061015 PADANG MALUKU UTARA 352 Phase 2 84 86 184 17.4 124.52163 -1.69256 12167 8103142005 SAMAL MALUKU 965 Phase 3 267 273 942 51.8 129.86074 -2.95181 12168 5316020002 UMBU PABAL NUSA TENGGARA TIMUR 1 856 Phase 3 344 241 832 52.2 119.63242 -9.64019 12169 5313130024 LATUNG NUSA TENGGARA TIMUR 210 Phase 1 47 39 903 8.6 120.44107 -8.44670 12170 5304072004 HOI NUSA TENGGARA TIMUR 126 Phase 1 33 23 199 5.0 124.43844 -9.80681 12171 5307060025 ALILA SELATAN NUSA TENGGARA TIMUR 192 Phase 2 50 42 450 9.2 124.50894 -8.16111 12172 8204080035 BUMI RAHMAT MALUKU UTARA 436 Phase 2 105 107 730 21.7 127.88109 -0.34106 12173 8103080015 BOOI MALUKU 103 Phase 3 27 27 702 5.2 128.64736 -3.61338 12174 5302031002 PRAIMADITA NUSA TENGGARA TIMUR 163 Phase 3 40 28 120 6.1 120.18790 -10.21569 12175 5313130020 TIMBU NUSA TENGGARA TIMUR 211 Phase 1 51 43 299 9.3 120.44467 -8.45619 12176 5304072004 HOI NUSA TENGGARA TIMUR 706 Phase 1 185 130 055 28.1 124.44364 -9.80006 12177 5308030019 TAGAWITI NUSA TENGGARA TIMUR 61 Phase 2 20 16 980 3.7 123.42624 -8.28175 12178 8205031002 SUKAMAJU MALUKU UTARA 531 Phase 2 163 167 238 33.7 127.96127 1.50310 12179 8103080015 BOOI MALUKU 198 Phase 3 51 52 326 9.9 128.64645 -3.61084 12180 5302031002 PRAIMADITA NUSA TENGGARA TIMUR 200 Phase 3 49 34 447 7.4 120.17997 -10.21860 12181 5313130020 TIMBU NUSA TENGGARA TIMUR 295 Phase 1 71 60 279 13.0 120.44952 -8.45711 12182 5304102004 NENOAT NUSA TENGGARA TIMUR 634 Phase 1 172 120 916 26.1 124.67856 -9.87747 12183 5308030019 TAGAWITI NUSA TENGGARA TIMUR 380 Phase 2 125 106 125 22.9 123.42276 -8.28528 12184 8207040007 ARU MALUKU UTARA 74 Phase 2 19 19 494 3.9 128.59324 2.61142 12185 8103080015 BOOI MALUKU 110 Phase 3 29 29 754 5.6 128.64718 -3.61568 12186 5302010011 TANARARA NUSA TENGGARA TIMUR 2 101 Phase 3 338 237 614 51.3 119.87598 -9.72903 12187 5313130020 TIMBU NUSA TENGGARA TIMUR 170 Phase 1 41 34 809 7.5 120.44064 -8.46368 12188 5320040009 DELO NUSA TENGGARA TIMUR 1 154 Phase 1 272 191 216 41.3 121.90244 -10.47942 12189 5310040010 NANGAHALE NUSA TENGGARA TIMUR 210 Phase 2 51 43 299 9.3 122.52146 -8.56436 12190 8207040007 ARU MALUKU UTARA 266 Phase 2 68 69 768 14.1 128.59156 2.61367 12191 8103143006 WAIPUTIH MALUKU 92 Phase 3 25 25 650 4.9 129.97574 -3.02917 12192 5302051007 RINDI NUSA TENGGARA TIMUR 88 Phase 3 14 9 842 2.1 120.67684 -9.92982 12193 5313130025 GOLO WOI NUSA TENGGARA TIMUR 364 Phase 1 88 74 712 16.1 120.43510 -8.46500 12194 5320010004 LEDEUNU NUSA TENGGARA TIMUR 2 468 Phase 1 652 458 356 98.9 121.60845 -10.60770 12195 5310031016 WOLONTERANG NUSA TENGGARA TIMUR 55 Phase 2 13 11 037 2.4 122.35449 -8.73420 12196 8207040006 CENDANA MALUKU UTARA 465 Phase 2 143 146 718 29.6 128.55346 2.63130 12197 8103040002 HAYA MALUKU 597 Phase 3 124 127 224 24.1 129.35445 -3.40967 12198 5302051007 RINDI NUSA TENGGARA TIMUR 92 Phase 3 15 10 545 2.3 120.67453 -9.93267 12199 5313130025 GOLO WOI NUSA TENGGARA TIMUR 444 Phase 1 108 91 692 19.8 120.43753 -8.47182 12200 5320010003 LEDEKE NUSA TENGGARA TIMUR 985 Phase 1 266 186 998 40.3 121.60588 -10.62026 12201 5310031016 WOLONTERANG NUSA TENGGARA TIMUR 29 Phase 2 7 5 943 1.3 122.35455 -8.73565 12202 8207040005 SOPI MALUKU UTARA 2 144 Phase 2 546 560 196 112.9 128.52668 2.57650 12203 8106010010 WAESALA MALUKU 664 Phase 3 151 154 926 29.3 127.90493 -3.28448 12204 5302051007 RINDI NUSA TENGGARA TIMUR 320 Phase 3 51 35 853 7.7 120.67126 -9.93335 12205 5313130019 WAE CODI NUSA TENGGARA TIMUR 774 Phase 1 166 140 934 30.4 120.44008 -8.47564 12206 5320010002 BOLUA NUSA TENGGARA TIMUR 1 631 Phase 1 493 346 579 74.8 121.57514 -10.62908 12207 5310031016 WOLONTERANG NUSA TENGGARA TIMUR 135 Phase 2 30 25 470 5.5 122.35405 -8.73828 12208 8203060026 WAYO MALUKU UTARA 1 075 Phase 2 254 260 604 52.5 124.38357 -1.95476 12209 8109040005 LENA MALUKU 1 080 Phase 3 316 324 216 61.3 127.13535 -3.66042 Annex II – Demand forecast results Page 26 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 12210 5302051007 RINDI NUSA TENGGARA TIMUR 409 Phase 3 64 44 992 9.7 120.67009 -9.93555 12211 5313130019 WAE CODI NUSA TENGGARA TIMUR 136 Phase 1 30 25 470 5.5 120.44045 -8.48010 12212 5320010005 BALLU NUSA TENGGARA TIMUR 1 256 Phase 1 377 265 031 57.2 121.56822 -10.60878 12213 5310031016 WOLONTERANG NUSA TENGGARA TIMUR 65 Phase 2 15 12 735 2.7 122.36357 -8.74637 12214 8207030006 NGELE NGELE BESAR MALUKU UTARA 636 Phase 2 133 136 458 27.5 128.21256 2.19670 12215 8109040005 LENA MALUKU 517 Phase 3 151 154 926 29.3 127.15575 -3.66529 12216 5302010009 KONDAMARA NUSA TENGGARA TIMUR 1 690 Phase 3 329 231 287 49.9 119.89409 -9.65135 12217 5313130019 WAE CODI NUSA TENGGARA TIMUR 343 Phase 1 74 62 826 13.6 120.43919 -8.48531 12218 5306010012 FAFOE NUSA TENGGARA TIMUR 93 Phase 1 24 16 872 3.6 124.93682 -9.63481 12219 5310031011 WAIHAWA NUSA TENGGARA TIMUR 426 Phase 2 93 78 957 17.0 122.37057 -8.74891 12220 8205021021 MARGO MULYO MALUKU UTARA 49 Phase 2 16 16 416 3.3 127.80109 1.35016 12221 8103143003 SETI MALUKU 301 Phase 3 65 66 690 12.6 129.96243 -3.05149 12222 5302010015 RAKAWATU NUSA TENGGARA TIMUR 1 350 Phase 3 280 196 840 42.5 119.89499 -9.64605 12223 5313130019 WAE CODI NUSA TENGGARA TIMUR 81 Phase 1 18 15 282 3.3 120.44358 -8.48165 12224 5314040006 LIDABESI NUSA TENGGARA TIMUR 924 Phase 1 223 156 769 33.8 123.12833 -10.70297 12225 5310031011 WAIHAWA NUSA TENGGARA TIMUR 268 Phase 2 59 50 091 10.8 122.37308 -8.74898 12226 8203041003 PASTABULU MALUKU UTARA 33 Phase 2 8 8 208 1.7 125.50856 -1.77868 12227 8106021003 LUHU MALUKU 1 187 Phase 3 195 200 070 37.8 127.96589 -3.43894 12228 5302081003 KUTA NUSA TENGGARA TIMUR 1 208 Phase 3 164 115 292 24.9 120.18227 -9.62520 12229 5313130019 WAE CODI NUSA TENGGARA TIMUR 301 Phase 1 65 55 185 11.9 120.44451 -8.48700 12230 5304100017 LANU NUSA TENGGARA TIMUR 60 Phase 1 18 12 654 2.7 124.64893 -9.83194 12231 5309011007 LEWOINGU NUSA TENGGARA TIMUR 88 Phase 2 24 20 376 4.4 122.81162 -8.39389 12232 8203041003 PASTABULU MALUKU UTARA 547 Phase 2 129 132 354 26.7 125.50932 -1.77920 12233 8103040002 HAYA MALUKU 1 307 Phase 3 270 277 020 52.4 129.36391 -3.41221 12234 5302070013 PAMBOTANJARA NUSA TENGGARA TIMUR 1 905 Phase 3 434 305 102 65.8 120.13041 -9.67383 12235 5313130010 LENDA NUSA TENGGARA TIMUR 392 Phase 1 89 75 561 16.3 120.44893 -8.49722 12236 5304100017 LANU NUSA TENGGARA TIMUR 250 Phase 1 72 50 616 10.9 124.65294 -9.83444 12237 5309050007 LAMAWAI NUSA TENGGARA TIMUR 80 Phase 2 21 17 829 3.8 123.10502 -8.45688 12238 8204034006 PASIMBAOS MALUKU UTARA 549 Phase 2 138 141 588 28.5 127.38941 -0.61770 12239 8106010010 WAESALA MALUKU 885 Phase 3 201 206 226 39.0 127.92018 -3.14685 12240 5302051007 RINDI NUSA TENGGARA TIMUR 74 Phase 3 12 8 436 1.8 120.67120 -9.93788 12241 5313130010 LENDA NUSA TENGGARA TIMUR 298 Phase 1 67 56 883 12.3 120.44988 -8.50274 12242 5304101003 SABUN NUSA TENGGARA TIMUR 311 Phase 1 93 65 379 14.1 124.66763 -9.82545 12243 5309050007 LAMAWAI NUSA TENGGARA TIMUR 239 Phase 2 61 51 789 11.2 123.10817 -8.46989 12244 8204023007 WARINGI MALUKU UTARA 658 Phase 2 193 198 018 39.9 127.56316 -1.18499 12245 8104020003 SIAHONI MALUKU 439 Phase 3 79 81 054 15.3 127.00381 -3.25803 12246 5302051001 TAMBURI NUSA TENGGARA TIMUR 268 Phase 3 68 47 804 10.3 120.67008 -9.94307 12247 5313130010 LENDA NUSA TENGGARA TIMUR 106 Phase 1 24 20 376 4.4 120.45144 -8.50890 12248 5304101003 SABUN NUSA TENGGARA TIMUR 25 Phase 1 8 5 624 1.2 124.66935 -9.81406 12249 5309050007 LAMAWAI NUSA TENGGARA TIMUR 145 Phase 2 37 31 413 6.8 123.11772 -8.46225 12250 8205060016 TERU TERU MALUKU UTARA 282 Phase 2 74 75 924 15.3 128.00626 2.18646 12251 8103142004 LEAWAI MALUKU 573 Phase 3 162 166 212 31.4 129.83633 -2.95588 12252 5302041008 WULA NUSA TENGGARA TIMUR 684 Phase 3 120 84 360 18.2 120.61606 -10.22467 12253 5313130010 LENDA NUSA TENGGARA TIMUR 497 Phase 1 112 95 088 20.5 120.45612 -8.50723 12254 5304104001 NENOTES NUSA TENGGARA TIMUR 520 Phase 1 163 114 589 24.7 124.67004 -9.81319 12255 5309050007 LAMAWAI NUSA TENGGARA TIMUR 172 Phase 2 44 37 356 8.1 123.12140 -8.46525 12256 8205060018 IGO MALUKU UTARA 550 Phase 2 134 137 484 27.7 128.04327 2.19875 12257 8103010010 NUSANTARA MALUKU 1 900 Phase 3 497 509 922 96.4 129.88049 -4.52253 12258 5302041008 WULA NUSA TENGGARA TIMUR 481 Phase 3 125 87 875 19.0 120.61662 -10.24346 12259 5313130010 LENDA NUSA TENGGARA TIMUR 164 Phase 1 37 31 413 6.8 120.44484 -8.51419 12260 5304104001 NENOTES NUSA TENGGARA TIMUR 108 Phase 1 34 23 902 5.2 124.67638 -9.80753 12261 5309050007 LAMAWAI NUSA TENGGARA TIMUR 7 Phase 2 2 1 698 0.4 123.12366 -8.46400 12262 8205053012 JERE TUA MALUKU UTARA 230 Phase 2 55 56 430 11.4 128.05993 2.16813 12263 8103140015 WAHAI MALUKU 1 714 Phase 3 446 457 596 86.5 129.49752 -2.79616 12264 5302041007 HADAKAMALI NUSA TENGGARA TIMUR 379 Phase 3 41 28 823 6.2 120.57321 -10.22743 12265 5313130001 BERE NUSA TENGGARA TIMUR 140 Phase 1 32 27 168 5.9 120.43720 -8.51818 12266 5304104001 NENOTES NUSA TENGGARA TIMUR 189 Phase 1 60 42 180 9.1 124.67669 -9.80704 12267 5309050008 WATOHARI NUSA TENGGARA TIMUR 165 Phase 2 46 39 054 8.4 123.12441 -8.46417 12268 8205053011 JERE MALUKU UTARA 13 Phase 2 4 4 104 0.8 128.05813 2.16624 12269 8103142001 KOBI MALUKU 411 Phase 3 158 162 108 30.7 129.81587 -2.91545 12270 5302041007 HADAKAMALI NUSA TENGGARA TIMUR 94 Phase 3 25 17 575 3.8 120.56996 -10.22759 12271 5313130001 BERE NUSA TENGGARA TIMUR 217 Phase 1 50 42 450 9.2 120.43906 -8.52446 12272 5304101003 SABUN NUSA TENGGARA TIMUR 564 Phase 1 168 118 104 25.5 124.68153 -9.81791 12273 5309050008 WATOHARI NUSA TENGGARA TIMUR 155 Phase 2 43 36 507 7.9 123.12557 -8.46419 12274 8205053011 JERE MALUKU UTARA 590 Phase 2 139 142 614 28.7 128.05325 2.15860 12275 8103142001 KOBI MALUKU 337 Phase 3 130 133 380 25.2 129.80205 -2.92494 12276 5302041007 HADAKAMALI NUSA TENGGARA TIMUR 181 Phase 3 48 33 744 7.3 120.56443 -10.22781 12277 5313123006 LIANG BUA NUSA TENGGARA TIMUR 358 Phase 1 77 65 373 14.1 120.43531 -8.52749 12278 5304101003 SABUN NUSA TENGGARA TIMUR 100 Phase 1 30 21 090 4.6 124.69362 -9.82284 12279 5309050008 WATOHARI NUSA TENGGARA TIMUR 210 Phase 2 58 49 242 10.6 123.12854 -8.46441 12280 8204032001 WAYA MALUKU UTARA 509 Phase 2 139 142 614 28.7 127.29000 -0.71045 12281 8103142002 KOBI MUKTI MALUKU 1 228 Phase 3 307 314 982 59.6 129.79617 -2.93195 12282 5302041007 HADAKAMALI NUSA TENGGARA TIMUR 41 Phase 3 11 7 733 1.7 120.56065 -10.22951 12283 5313123007 BANGKA AJANG NUSA TENGGARA TIMUR 741 Phase 1 164 139 236 30.0 120.42825 -8.52694 12284 5304101003 SABUN NUSA TENGGARA TIMUR 371 Phase 1 111 78 033 16.8 124.69454 -9.82294 12285 5310030005 UMAUTA NUSA TENGGARA TIMUR 19 Phase 2 6 5 094 1.1 122.31030 -8.72972 12286 8204032002 INDONG MALUKU UTARA 834 Phase 2 257 263 682 53.1 127.30266 -0.68769 12287 8103141006 LABUAN MALUKU 1 010 Phase 3 210 215 460 40.7 129.04364 -2.79718 12288 5302041007 HADAKAMALI NUSA TENGGARA TIMUR 122 Phase 3 32 22 496 4.9 120.55943 -10.22744 12289 5313123007 BANGKA AJANG NUSA TENGGARA TIMUR 215 Phase 1 48 40 752 8.8 120.42550 -8.52900 12290 5304101003 SABUN NUSA TENGGARA TIMUR 360 Phase 1 107 75 221 16.2 124.69285 -9.82974 12291 5310030006 IPIR NUSA TENGGARA TIMUR 33 Phase 2 9 7 641 1.6 122.31041 -8.73017 12292 8205011010 BARUMADEHE MALUKU UTARA 322 Phase 2 81 83 106 16.7 127.70242 1.06741 12293 8103141007 PASANEA MALUKU 1 027 Phase 3 210 215 460 40.7 129.05827 -2.80375 12294 5302041006 PARANDA NUSA TENGGARA TIMUR 215 Phase 3 50 35 150 7.6 120.55854 -10.22130 Annex II – Demand forecast results Page 27 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 12295 5313130010 LENDA NUSA TENGGARA TIMUR 217 Phase 1 49 41 601 9.0 120.44745 -8.51696 12296 5304101006 LEONMENI NUSA TENGGARA TIMUR 599 Phase 1 150 105 450 22.8 124.70687 -9.81929 12297 5310030006 IPIR NUSA TENGGARA TIMUR 226 Phase 2 61 51 789 11.2 122.31170 -8.73239 12298 8205011007 TIOWOR MALUKU UTARA 390 Phase 2 102 104 652 21.1 127.70669 1.05900 12299 8103080016 HARIA MALUKU 267 Phase 3 55 56 430 10.7 128.62861 -3.60522 12300 5302041006 PARANDA NUSA TENGGARA TIMUR 269 Phase 3 46 32 338 7.0 120.56027 -10.21943 12301 5313130001 BERE NUSA TENGGARA TIMUR 362 Phase 1 83 70 467 15.2 120.44755 -8.51969 12302 5320030001 DAINAO NUSA TENGGARA TIMUR 747 Phase 1 171 120 213 25.9 121.83091 -10.61819 12303 5310030006 IPIR NUSA TENGGARA TIMUR 215 Phase 2 58 49 242 10.6 122.31241 -8.73625 12304 8205011006 DUM DUM MALUKU UTARA 61 Phase 2 13 13 338 2.7 127.70138 1.05200 12305 8103080016 HARIA MALUKU 242 Phase 3 50 51 300 9.7 128.62966 -3.61029 12306 5302041007 HADAKAMALI NUSA TENGGARA TIMUR 213 Phase 3 56 39 368 8.5 120.55398 -10.22665 12307 5313130001 BERE NUSA TENGGARA TIMUR 175 Phase 1 40 33 960 7.3 120.45713 -8.51910 12308 5306041003 ALAS NUSA TENGGARA TIMUR 367 Phase 1 104 73 112 15.8 125.04768 -9.38787 12309 5309060023 BUKIT SEBURI II NUSA TENGGARA TIMUR 680 Phase 2 170 144 330 31.1 123.12360 -8.31751 12310 8205011006 DUM DUM MALUKU UTARA 255 Phase 2 53 54 378 11.0 127.70433 1.04769 12311 8106010010 WAESALA MALUKU 300 Phase 3 69 70 794 13.4 127.90326 -3.15646 12312 5302041007 HADAKAMALI NUSA TENGGARA TIMUR 276 Phase 3 72 50 616 10.9 120.55305 -10.22840 12313 5313130027 GOLO NCUANG NUSA TENGGARA TIMUR 113 Phase 1 27 22 923 4.9 120.46630 -8.51871 12314 5304111002 SKINU NUSA TENGGARA TIMUR 141 Phase 1 45 31 635 6.8 124.78552 -9.75100 12315 5309071006 LAMAWOLO NUSA TENGGARA TIMUR 189 Phase 2 61 51 789 11.2 123.24928 -8.37586 12316 8205011006 DUM DUM MALUKU UTARA 31 Phase 2 7 7 182 1.4 127.69928 1.05411 12317 8106010010 WAESALA MALUKU 263 Phase 3 60 61 560 11.6 127.87315 -3.15655 12318 5302041007 HADAKAMALI NUSA TENGGARA TIMUR 145 Phase 3 38 26 714 5.8 120.55078 -10.22621 12319 5313130027 GOLO NCUANG NUSA TENGGARA TIMUR 994 Phase 1 236 200 364 43.2 120.47187 -8.52718 12320 5304111002 SKINU NUSA TENGGARA TIMUR 26 Phase 1 9 6 327 1.4 124.78918 -9.75961 12321 5309011007 LEWOINGU NUSA TENGGARA TIMUR 202 Phase 2 54 45 846 9.9 122.82008 -8.39752 12322 8205011009 KUNTUM MEKAR MALUKU UTARA 409 Phase 2 100 102 600 20.7 127.69727 1.05744 12323 8106010010 WAESALA MALUKU 116 Phase 3 27 27 702 5.2 127.85143 -3.17182 12324 5302041005 LUMBU MANGGIT NUSA TENGGARA TIMUR 728 Phase 3 109 76 627 16.5 120.54634 -10.22471 12325 5313130027 GOLO NCUANG NUSA TENGGARA TIMUR 97 Phase 1 24 20 376 4.4 120.45918 -8.52545 12326 5304111002 SKINU NUSA TENGGARA TIMUR 71 Phase 1 23 16 169 3.5 124.78858 -9.76241 12327 5309011007 LEWOINGU NUSA TENGGARA TIMUR 19 Phase 2 6 5 094 1.1 122.82524 -8.40373 12328 8202044004 MOREALA MALUKU UTARA 705 Phase 2 154 158 004 31.8 128.52312 0.34288 12329 8106010010 WAESALA MALUKU 781 Phase 3 178 182 628 34.5 127.87008 -3.18496 12330 5317040006 BONDO UKKA NUSA TENGGARA TIMUR 696 Phase 3 99 69 597 15.0 119.17426 -9.56771 12331 5313130001 BERE NUSA TENGGARA TIMUR 216 Phase 1 50 42 450 9.2 120.45799 -8.52654 12332 5304111002 SKINU NUSA TENGGARA TIMUR 246 Phase 1 78 54 834 11.8 124.78242 -9.77153 12333 5309011012 DUN TANA LEWOINGU NUSA TENGGARA TIMUR 122 Phase 2 28 23 772 5.1 122.82788 -8.40444 12334 8202044005 SIBENPOPO MALUKU UTARA 426 Phase 2 100 102 600 20.7 128.50217 0.35478 12335 8106010010 WAESALA MALUKU 688 Phase 3 157 161 082 30.5 127.87458 -3.19637 12336 5302040016 MBURUKULU NUSA TENGGARA TIMUR 1 565 Phase 3 287 201 761 43.5 120.78721 -10.09275 12337 5313130001 BERE NUSA TENGGARA TIMUR 366 Phase 1 84 71 316 15.4 120.45602 -8.52569 12338 5304111002 SKINU NUSA TENGGARA TIMUR 475 Phase 1 151 106 153 22.9 124.78908 -9.77357 12339 5309011012 DUN TANA LEWOINGU NUSA TENGGARA TIMUR 161 Phase 2 37 31 413 6.8 122.83226 -8.40907 12340 8203041003 PASTABULU MALUKU UTARA 24 Phase 2 6 6 156 1.2 125.51018 -1.77851 12341 8106010010 WAESALA MALUKU 340 Phase 3 78 80 028 15.1 127.87469 -3.20624 12342 5302041005 LUMBU MANGGIT NUSA TENGGARA TIMUR 319 Phase 3 73 51 319 11.1 120.54250 -10.22202 12343 5313130010 LENDA NUSA TENGGARA TIMUR 62 Phase 1 14 11 886 2.6 120.45967 -8.50635 12344 5304111002 SKINU NUSA TENGGARA TIMUR 20 Phase 1 7 4 921 1.1 124.79635 -9.77249 12345 5309032001 LAMIKA NUSA TENGGARA TIMUR 472 Phase 2 128 108 672 23.4 122.84215 -8.41574 12346 8204034007 SAWANAKAR MALUKU UTARA 295 Phase 2 141 144 666 29.1 127.36650 -0.61766 12347 8106010009 SOLE MALUKU 543 Phase 3 119 122 094 23.1 127.83315 -3.15489 12348 5316020009 PRAI MADETA NUSA TENGGARA TIMUR 207 Phase 3 57 40 071 8.6 119.59407 -9.52372 12349 5313130011 COMPANG CIBAL NUSA TENGGARA TIMUR 34 Phase 1 9 7 641 1.6 120.46225 -8.50027 12350 5306012001 LAMEA NUSA TENGGARA TIMUR 756 Phase 1 193 135 679 29.3 124.80520 -9.76627 12351 5309032001 LAMIKA NUSA TENGGARA TIMUR 213 Phase 2 58 49 242 10.6 122.84621 -8.42295 12352 8204034008 TOIN MALUKU UTARA 442 Phase 2 130 133 380 26.9 127.33659 -0.62788 12353 8106010009 SOLE MALUKU 661 Phase 3 145 148 770 28.1 127.80962 -3.16152 12354 5302041003 LA TENA NUSA TENGGARA TIMUR 96 Phase 3 20 14 060 3.0 120.54025 -10.21888 12355 5313130011 COMPANG CIBAL NUSA TENGGARA TIMUR 361 Phase 1 95 80 655 17.4 120.46090 -8.49817 12356 5304101013 BAUS NUSA TENGGARA TIMUR 225 Phase 1 67 47 101 10.2 124.78951 -9.77709 12357 5309032003 WATOTIKA ILE NUSA TENGGARA TIMUR 469 Phase 2 106 89 994 19.4 122.85395 -8.40459 12358 8106010009 SOLE MALUKU 115 Phase 3 26 26 676 5.0 127.80786 -3.15981 12359 5302041003 LA TENA NUSA TENGGARA TIMUR 161 Phase 3 34 23 902 5.2 120.53704 -10.21569 12360 8204034001 KAMPUNG BARU MALUKU UTARA 1 187 Phase 2 247 253 422 51.1 127.30201 -0.63590 12361 5313130011 COMPANG CIBAL NUSA TENGGARA TIMUR 307 Phase 1 81 68 769 14.8 120.46313 -8.49333 12362 5304104003 POLI NUSA TENGGARA TIMUR 412 Phase 1 112 78 736 17.0 124.68990 -9.75231 12363 5309032003 WATOTIKA ILE NUSA TENGGARA TIMUR 57 Phase 2 13 11 037 2.4 122.85628 -8.40285 12364 8106010009 SOLE MALUKU 194 Phase 3 43 44 118 8.3 127.79004 -3.18181 12365 5302041003 LA TENA NUSA TENGGARA TIMUR 165 Phase 3 35 24 605 5.3 120.53237 -10.21700 12366 8204034002 BATUTAGA MALUKU UTARA 393 Phase 2 80 82 080 16.5 127.34295 -0.64868 12367 5313130011 COMPANG CIBAL NUSA TENGGARA TIMUR 99 Phase 1 27 22 923 4.9 120.46525 -8.48785 12368 5314060007 MATASIO NUSA TENGGARA TIMUR 721 Phase 1 218 153 254 33.1 123.32006 -10.61921 12369 5309032004 LEWOKLUOK NUSA TENGGARA TIMUR 173 Phase 2 48 40 752 8.8 122.85909 -8.39819 12370 8106010009 SOLE MALUKU 941 Phase 3 206 211 356 40.0 127.77593 -3.16564 12371 5302041002 LAINJANJI NUSA TENGGARA TIMUR 415 Phase 3 97 68 191 14.7 120.51971 -10.23034 12372 8203041003 PASTABULU MALUKU UTARA 19 Phase 2 5 5 130 1.0 125.51058 -1.77861 12373 5313130018 BANGKA ARA NUSA TENGGARA TIMUR 30 Phase 1 8 6 792 1.5 120.46470 -8.48752 12374 5314060003 FAIFUA NUSA TENGGARA TIMUR 816 Phase 1 210 147 630 31.9 123.40983 -10.64731 12375 5309032004 LEWOKLUOK NUSA TENGGARA TIMUR 670 Phase 2 186 157 914 34.1 122.85118 -8.39501 12376 8106010013 TONU JAYA MALUKU 135 Phase 3 28 28 728 5.4 127.79596 -3.19437 12377 5302041002 LAINJANJI NUSA TENGGARA TIMUR 321 Phase 3 75 52 725 11.4 120.51745 -10.23673 12378 8203040015 PELITA MALUKU UTARA 1 122 Phase 2 241 247 266 49.8 125.33010 -1.83911 12379 5313130018 BANGKA ARA NUSA TENGGARA TIMUR 157 Phase 1 40 33 960 7.3 120.46095 -8.48251 Annex II – Demand forecast results Page 28 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 12380 5320050008 EIMAU NUSA TENGGARA TIMUR 976 Phase 1 205 144 115 31.1 121.92201 -10.44257 12381 5310052004 KOKOWAHOR NUSA TENGGARA TIMUR 2 Phase 2 1 849 0.2 122.27306 -8.68071 12382 8106010013 TONU JAYA MALUKU 708 Phase 3 146 149 796 28.3 127.79954 -3.21944 12383 5302041002 LAINJANJI NUSA TENGGARA TIMUR 420 Phase 3 98 68 894 14.9 120.50909 -10.22518 12384 8203040001 PAS IPA MALUKU UTARA 552 Phase 2 123 126 198 25.4 125.37672 -1.88192 12385 5313130018 BANGKA ARA NUSA TENGGARA TIMUR 406 Phase 1 102 86 598 18.7 120.46098 -8.47959 12386 5306020002 KAKANIUK NUSA TENGGARA TIMUR 667 Phase 1 173 121 619 26.2 124.84534 -9.58026 12387 5310050005 UMAGERA NUSA TENGGARA TIMUR 83 Phase 2 17 14 433 3.1 122.27330 -8.68117 12388 8106010013 TONU JAYA MALUKU 1 057 Phase 3 217 222 642 42.1 127.79232 -3.23109 12389 5302051001 TAMBURI NUSA TENGGARA TIMUR 215 Phase 3 55 38 665 8.3 120.66833 -9.94463 12390 8203040001 PAS IPA MALUKU UTARA 754 Phase 2 169 173 394 34.9 125.37937 -1.88264 12391 5313130020 TIMBU NUSA TENGGARA TIMUR 475 Phase 1 115 97 635 21.1 120.46015 -8.47220 12392 5304091003 FATUAT NUSA TENGGARA TIMUR 590 Phase 1 132 92 796 20.0 124.63131 -9.93484 12393 5309062007 NUBALEMA NUSA TENGGARA TIMUR 120 Phase 2 27 22 923 4.9 123.16097 -8.31540 12394 8106010008 TAHALUPU MALUKU 525 Phase 3 127 130 302 24.6 127.76948 -3.24687 12395 5316020009 PRAI MADETA NUSA TENGGARA TIMUR 78 Phase 3 22 15 466 3.3 119.59401 -9.52245 12396 8201090020 BUKUMATITI MALUKU UTARA 1 013 Phase 2 215 220 590 44.4 127.56178 1.09213 12397 5313130011 COMPANG CIBAL NUSA TENGGARA TIMUR 63 Phase 1 17 14 433 3.1 120.46391 -8.50085 12398 5314070002 NEMBERALA NUSA TENGGARA TIMUR 1 035 Phase 1 215 151 145 32.6 122.84353 -10.89122 12399 5309062007 NUBALEMA NUSA TENGGARA TIMUR 63 Phase 2 14 11 886 2.6 123.16169 -8.31671 12400 8106010008 TAHALUPU MALUKU 871 Phase 3 211 216 486 40.9 127.75501 -3.24557 12401 5317030011 BUKAMBERO NUSA TENGGARA TIMUR 15 Phase 3 3 2 109 0.5 119.12166 -9.45865 12402 8202043010 DAMULI MALUKU UTARA 695 Phase 2 118 121 068 24.4 128.68340 0.39896 12403 5313130027 GOLO NCUANG NUSA TENGGARA TIMUR 351 Phase 1 84 71 316 15.4 120.47522 -8.53546 12404 5304101013 BAUS NUSA TENGGARA TIMUR 75 Phase 1 23 16 169 3.5 124.78979 -9.78301 12405 5308060008 LEUDANUNG NUSA TENGGARA TIMUR 12 Phase 2 4 3 396 0.7 123.74699 -8.19866 12406 8103111001 LARIKE MALUKU 684 Phase 3 131 134 406 25.4 127.94663 -3.46395 12407 5316020009 PRAI MADETA NUSA TENGGARA TIMUR 269 Phase 3 74 52 022 11.2 119.60038 -9.52127 12408 8203041003 PASTABULU MALUKU UTARA 19 Phase 2 5 5 130 1.0 125.51078 -1.77904 12409 5312030021 WERE III NUSA TENGGARA TIMUR 737 Phase 1 163 138 387 29.9 121.10385 -8.91633 12410 5304101013 BAUS NUSA TENGGARA TIMUR 265 Phase 1 79 55 537 12.0 124.78927 -9.78607 12411 5308060008 LEUDANUNG NUSA TENGGARA TIMUR 76 Phase 2 21 17 829 3.8 123.74497 -8.19875 12412 8103111001 LARIKE MALUKU 537 Phase 3 103 105 678 20.0 127.94440 -3.47717 12413 5316020010 SAMBALI LOKU NUSA TENGGARA TIMUR 1 517 Phase 3 262 184 186 39.7 119.61242 -9.47442 12414 8204062003 NGUTE NGUTE MALUKU UTARA 379 Phase 2 109 111 834 22.5 127.45291 -0.02976 12415 5319050028 GOLO NDARI NUSA TENGGARA TIMUR 386 Phase 1 102 86 598 18.7 120.54779 -8.51845 12416 5304110006 FATILO NUSA TENGGARA TIMUR 343 Phase 1 80 56 240 12.1 124.69378 -9.71502 12417 5310070015 MAHEBORA NUSA TENGGARA TIMUR 247 Phase 2 69 58 581 12.6 122.11162 -8.67196 12418 8109030004 FATMITE MALUKU 504 Phase 3 118 121 068 22.9 126.71024 -3.84864 12419 5317050011 REDA PADA NUSA TENGGARA TIMUR 199 Phase 3 43 30 229 6.5 119.19630 -9.49389 12420 8203041003 PASTABULU MALUKU UTARA 437 Phase 2 103 105 678 21.3 125.51355 -1.77912 12421 5311052001 HOBATUWA NUSA TENGGARA TIMUR 399 Phase 1 96 81 504 17.6 121.96576 -8.79746 12422 5304101005 BOKING NUSA TENGGARA TIMUR 169 Phase 1 45 31 635 6.8 124.73916 -9.85519 12423 5308031003 LAMAWOLO NUSA TENGGARA TIMUR 398 Phase 2 116 98 484 21.2 123.53085 -8.27994 12424 8103143007 AKETERNATE MALUKU 733 Phase 3 182 186 732 35.3 130.05614 -3.00745 12425 5317080011 LETE KONDA NUSA TENGGARA TIMUR 205 Phase 3 37 26 011 5.6 119.31627 -9.43069 12426 8271010014 SULAMADAHA MALUKU UTARA 64 Phase 2 19 19 494 3.9 127.33303 0.85528 12427 5313130020 TIMBU NUSA TENGGARA TIMUR 421 Phase 1 102 86 598 18.7 120.46123 -8.46051 12428 5304101005 BOKING NUSA TENGGARA TIMUR 31 Phase 1 9 6 327 1.4 124.73719 -9.85860 12429 5308060013 DOLULOLONG NUSA TENGGARA TIMUR 604 Phase 2 111 94 239 20.3 123.71191 -8.25142 12430 8103111001 LARIKE MALUKU 181 Phase 3 35 35 910 6.8 127.94411 -3.48181 12431 5317080011 LETE KONDA NUSA TENGGARA TIMUR 224 Phase 3 40 28 120 6.1 119.31896 -9.42411 12432 8205053010 BERINGIN JAYA MALUKU UTARA 252 Phase 2 63 64 638 13.0 128.03225 2.12501 12433 5313040016 GOLO MUNTAS NUSA TENGGARA TIMUR 218 Phase 1 50 42 450 9.2 120.43048 -8.77687 12434 5304101004 NANO NUSA TENGGARA TIMUR 656 Phase 1 174 122 322 26.4 124.72937 -9.85245 12435 5309060022 BUKIT SEBURI NUSA TENGGARA TIMUR 78 Phase 2 16 13 584 2.9 123.12013 -8.32027 12436 8106010008 TAHALUPU MALUKU 1 329 Phase 3 321 329 346 62.3 127.69566 -3.25334 12437 5302041004 LAI PANDAK NUSA TENGGARA TIMUR 479 Phase 3 121 85 063 18.4 120.53457 -10.21027 12438 8205053009 PELITA MALUKU UTARA 487 Phase 2 150 153 900 31.0 128.01589 2.10600 12439 5313040016 GOLO MUNTAS NUSA TENGGARA TIMUR 430 Phase 1 97 82 353 17.8 120.43639 -8.78245 12440 5304101004 NANO NUSA TENGGARA TIMUR 479 Phase 1 127 89 281 19.3 124.71780 -9.84709 12441 5309060022 BUKIT SEBURI NUSA TENGGARA TIMUR 71 Phase 2 14 11 886 2.6 123.11888 -8.32244 12442 8109040003 WAELIKUT MALUKU 104 Phase 3 21 21 546 4.1 126.89167 -3.52102 12443 5316020011 WANGGA WAIYENGU NUSA TENGGARA TIMUR 842 Phase 3 181 127 243 27.5 119.63472 -9.52636 12444 8204032003 BOBO MALUKU UTARA 242 Phase 2 71 72 846 14.7 127.26897 -0.66482 12445 5313040016 GOLO MUNTAS NUSA TENGGARA TIMUR 140 Phase 1 32 27 168 5.9 120.44314 -8.78493 12446 5304072004 HOI NUSA TENGGARA TIMUR 133 Phase 1 35 24 605 5.3 124.43565 -9.79440 12447 5309060022 BUKIT SEBURI NUSA TENGGARA TIMUR 339 Phase 2 67 56 883 12.3 123.11671 -8.32483 12448 8106040005 RIRING MALUKU 687 Phase 3 144 147 744 27.9 128.45826 -2.98775 12449 5302071004 MAULIRU NUSA TENGGARA TIMUR 217 Phase 3 12 8 436 1.8 120.28915 -9.67491 12450 8204032004 PELITA JAYA MALUKU UTARA 19 Phase 2 6 6 156 1.2 127.26841 -0.66447 12451 5313040012 LANGGO NUSA TENGGARA TIMUR 600 Phase 1 121 102 729 22.2 120.45817 -8.78123 12452 5304072004 HOI NUSA TENGGARA TIMUR 327 Phase 1 86 60 458 13.0 124.42620 -9.78971 12453 5309060017 DANIBAO NUSA TENGGARA TIMUR 345 Phase 2 76 64 524 13.9 123.11077 -8.32619 12454 8106010008 TAHALUPU MALUKU 1 888 Phase 3 456 467 856 88.5 127.65688 -3.23027 12455 5302071004 MAULIRU NUSA TENGGARA TIMUR 259 Phase 3 44 30 932 6.7 120.28345 -9.67486 12456 8204032004 PELITA JAYA MALUKU UTARA 720 Phase 2 219 224 694 45.3 127.26410 -0.66324 12457 5313040012 LANGGO NUSA TENGGARA TIMUR 453 Phase 1 92 78 108 16.9 120.46690 -8.77496 12458 5304072004 HOI NUSA TENGGARA TIMUR 157 Phase 1 41 28 823 6.2 124.42342 -9.79155 12459 5309060017 DANIBAO NUSA TENGGARA TIMUR 124 Phase 2 28 23 772 5.1 123.10900 -8.32570 12460 8103111001 LARIKE MALUKU 392 Phase 3 75 76 950 14.6 127.94560 -3.49749 12461 5302071004 MAULIRU NUSA TENGGARA TIMUR 78 Phase 3 14 9 842 2.1 120.29120 -9.68529 12462 8204032005 AKEDABO MALUKU UTARA 409 Phase 2 104 106 704 21.5 127.23288 -0.60571 12463 5313040012 LANGGO NUSA TENGGARA TIMUR 398 Phase 1 81 68 769 14.8 120.47064 -8.78433 12464 5304072004 HOI NUSA TENGGARA TIMUR 397 Phase 1 104 73 112 15.8 124.41827 -9.79450 Annex II – Demand forecast results Page 29 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 12465 5309060040 NIMUN DANI BAO NUSA TENGGARA TIMUR 126 Phase 2 26 22 074 4.8 123.10642 -8.32853 12466 8103111001 LARIKE MALUKU 301 Phase 3 58 59 508 11.3 127.94642 -3.50168 12467 5302071004 MAULIRU NUSA TENGGARA TIMUR 156 Phase 3 27 18 981 4.1 120.29171 -9.68554 12468 8204032006 LOLEONGUSU MALUKU UTARA 257 Phase 2 78 80 028 16.1 127.21527 -0.61082 12469 5313040013 TADO NUSA TENGGARA TIMUR 648 Phase 1 145 123 105 26.6 120.48985 -8.79347 12470 5304072004 HOI NUSA TENGGARA TIMUR 512 Phase 1 134 94 202 20.3 124.41692 -9.78792 12471 5309060040 NIMUN DANI BAO NUSA TENGGARA TIMUR 52 Phase 2 11 9 339 2.0 123.11246 -8.33559 12472 8106020016 ETTY MALUKU 925 Phase 3 230 235 980 44.6 128.20138 -3.10126 12473 5302071004 MAULIRU NUSA TENGGARA TIMUR 210 Phase 3 36 25 308 5.5 120.29164 -9.69062 12474 8204050001 WIRING YOYOK MALUKU UTARA 325 Phase 2 73 74 898 15.1 127.23429 -0.54741 12475 5313040013 TADO NUSA TENGGARA TIMUR 58 Phase 1 13 11 037 2.4 120.48911 -8.79702 12476 5304010006 NETPALA NUSA TENGGARA TIMUR 172 Phase 1 34 23 902 5.2 124.26242 -9.73894 12477 5309060040 NIMUN DANI BAO NUSA TENGGARA TIMUR 276 Phase 2 56 47 544 10.3 123.11547 -8.33699 12478 8103141008 KARLUTUKARA MALUKU 475 Phase 3 98 100 548 19.0 129.07275 -2.84801 12479 5302080010 WUNGA NUSA TENGGARA TIMUR 740 Phase 3 178 125 134 27.0 119.94044 -9.37648 12480 8204050002 TAWABI MALUKU UTARA 396 Phase 2 106 108 756 21.9 127.23535 -0.53491 12481 5313040013 TADO NUSA TENGGARA TIMUR 263 Phase 1 59 50 091 10.8 120.49110 -8.80169 12482 5304010006 NETPALA NUSA TENGGARA TIMUR 574 Phase 1 112 78 736 17.0 124.25977 -9.74250 12483 5309060040 NIMUN DANI BAO NUSA TENGGARA TIMUR 177 Phase 2 36 30 564 6.6 123.11624 -8.33540 12484 8103141009 PAA MALUKU 96 Phase 3 29 29 754 5.6 129.07646 -2.85604 12485 5302080011 NAPU NUSA TENGGARA TIMUR 833 Phase 3 208 146 224 31.6 119.92637 -9.39630 12486 8204052007 JERET MALUKU UTARA 261 Phase 2 72 73 872 14.9 127.22747 -0.51139 12487 5313040014 KOAK NUSA TENGGARA TIMUR 219 Phase 1 50 42 450 9.2 120.49940 -8.80414 12488 5304010006 NETPALA NUSA TENGGARA TIMUR 344 Phase 1 67 47 101 10.2 124.25711 -9.74404 12489 5308060014 HINGALAMAMENGI NUSA TENGGARA TIMUR 1 228 Phase 2 193 163 857 35.4 123.72391 -8.26393 12490 8103141010 WAILULU MALUKU 128 Phase 3 38 38 988 7.4 129.07133 -2.87976 12491 5316030011 TANA MBANAS NUSA TENGGARA TIMUR 2 356 Phase 3 421 295 963 63.9 119.86613 -9.44657 12492 8204052006 KASIRUTA DALAM MALUKU UTARA 422 Phase 2 97 99 522 20.1 127.20657 -0.48499 12493 5313040014 KOAK NUSA TENGGARA TIMUR 174 Phase 1 40 33 960 7.3 120.50054 -8.80382 12494 5306070005 UMAKLARAN NUSA TENGGARA TIMUR 119 Phase 1 33 23 199 5.0 124.91768 -9.08999 12495 5308030019 TAGAWITI NUSA TENGGARA TIMUR 115 Phase 2 38 32 262 7.0 123.42289 -8.28024 12496 8103141010 WAILULU MALUKU 129 Phase 3 38 38 988 7.4 129.07182 -2.89145 12497 5302012004 LAI HAWU NUSA TENGGARA TIMUR 1 656 Phase 3 348 244 644 52.8 119.83373 -9.75745 12498 8204051010 IMBU IMBU MALUKU UTARA 288 Phase 2 68 69 768 14.1 127.15888 -0.47215 12499 5313040014 KOAK NUSA TENGGARA TIMUR 864 Phase 1 196 166 404 35.9 120.49921 -8.79772 12500 5306070005 UMAKLARAN NUSA TENGGARA TIMUR 393 Phase 1 107 75 221 16.2 124.92197 -9.09090 12501 5309071014 NELE LAMAWANGI NUSA TENGGARA TIMUR 213 Phase 2 68 57 732 12.5 123.27917 -8.36066 12502 8103141011 HORALE MALUKU 1 216 Phase 3 260 266 760 50.4 129.05771 -2.89845 12503 5302051001 TAMBURI NUSA TENGGARA TIMUR 182 Phase 3 47 33 041 7.1 120.66206 -9.96209 12504 8204051003 BISORI MALUKU UTARA 478 Phase 2 112 114 912 23.2 127.12492 -0.42856 12505 5313040014 KOAK NUSA TENGGARA TIMUR 270 Phase 1 62 52 638 11.4 120.50020 -8.79712 12506 5306070005 UMAKLARAN NUSA TENGGARA TIMUR 305 Phase 1 83 58 349 12.6 124.92829 -9.09477 12507 5310052001 TEKAIKU NUSA TENGGARA TIMUR 307 Phase 2 106 89 994 19.4 122.23861 -8.69280 12508 8103141010 WAILULU MALUKU 363 Phase 3 107 109 782 20.8 129.05517 -2.89785 12509 5302051001 TAMBURI NUSA TENGGARA TIMUR 222 Phase 3 57 40 071 8.6 120.66237 -9.96327 12510 8204051004 DOKO MALUKU UTARA 759 Phase 2 183 187 758 37.8 127.11743 -0.38232 12511 5311020015 RIARAJA NUSA TENGGARA TIMUR 72 Phase 1 21 17 829 3.8 121.62344 -8.78878 12512 5306070005 UMAKLARAN NUSA TENGGARA TIMUR 313 Phase 1 85 59 755 12.9 124.92759 -9.08205 12513 5309060013 ILEPATI NUSA TENGGARA TIMUR 146 Phase 2 36 30 564 6.6 123.09493 -8.33012 12514 8106011007 LUHUTUBAN MALUKU 226 Phase 3 53 54 378 10.3 127.62168 -3.30662 12515 5316030007 BULU BOKAT NUSA TENGGARA TIMUR 1 139 Phase 3 226 158 878 34.3 119.67134 -9.53725 12516 8204051005 PALAMEA MALUKU UTARA 559 Phase 2 136 139 536 28.1 127.13584 -0.35503 12517 5311020014 EMBURIA NUSA TENGGARA TIMUR 332 Phase 1 85 72 165 15.6 121.61713 -8.79438 12518 5306070005 UMAKLARAN NUSA TENGGARA TIMUR 356 Phase 1 97 68 191 14.7 124.93590 -9.08287 12519 5309060013 ILEPATI NUSA TENGGARA TIMUR 120 Phase 2 30 25 470 5.5 123.09509 -8.33200 12520 8106011007 LUHUTUBAN MALUKU 240 Phase 3 56 57 456 10.9 127.63243 -3.32072 12521 5316030006 MARA DESA NUSA TENGGARA TIMUR 1 182 Phase 3 261 183 483 39.6 119.71680 -9.52596 12522 8204051006 ARUMAMANG MALUKU UTARA 587 Phase 2 128 131 328 26.5 127.14021 -0.32100 12523 5311020014 EMBURIA NUSA TENGGARA TIMUR 386 Phase 1 99 84 051 18.1 121.62106 -8.79897 12524 5304100033 NETUTNANA NUSA TENGGARA TIMUR 23 Phase 1 7 4 921 1.1 124.60665 -9.83824 12525 5309060013 ILEPATI NUSA TENGGARA TIMUR 399 Phase 2 97 82 353 17.8 123.09806 -8.33819 12526 8106011007 LUHUTUBAN MALUKU 363 Phase 3 85 87 210 16.5 127.63132 -3.32862 12527 5302041003 LA TENA NUSA TENGGARA TIMUR 209 Phase 3 44 30 932 6.7 120.52912 -10.21102 12528 8204051009 SENGGA BARU MALUKU UTARA 397 Phase 2 89 91 314 18.4 127.12904 -0.27814 12529 5313040018 WAE AJANG NUSA TENGGARA TIMUR 58 Phase 1 13 11 037 2.4 120.42514 -8.75021 12530 5304100014 ANIN NUSA TENGGARA TIMUR 622 Phase 1 148 104 044 22.4 124.59843 -9.83794 12531 5309061012 DEMONDEIN NUSA TENGGARA TIMUR 304 Phase 2 58 49 242 10.6 123.10541 -8.34499 12532 8106011007 LUHUTUBAN MALUKU 610 Phase 3 142 145 692 27.6 127.65083 -3.35115 12533 5302051003 HANGGARORU NUSA TENGGARA TIMUR 17 Phase 3 5 3 515 0.8 120.65051 -9.99854 12534 8204052008 TUTUHU MALUKU UTARA 232 Phase 2 62 63 612 12.8 127.14688 -0.26319 12535 5313040018 WAE AJANG NUSA TENGGARA TIMUR 208 Phase 1 44 37 356 8.1 120.42526 -8.75500 12536 5304100004 NUNLEU NUSA TENGGARA TIMUR 367 Phase 1 91 63 973 13.8 124.63114 -9.88749 12537 5309061012 DEMONDEIN NUSA TENGGARA TIMUR 37 Phase 2 8 6 792 1.5 123.10150 -8.34773 12538 8106011007 LUHUTUBAN MALUKU 221 Phase 3 52 53 352 10.1 127.62932 -3.36635 12539 5302051003 HANGGARORU NUSA TENGGARA TIMUR 392 Phase 3 95 66 785 14.4 120.64864 -10.00165 12540 8204061002 HATEJAWA MALUKU UTARA 433 Phase 2 105 107 730 21.7 127.12277 -0.23811 12541 5313040017 GARA NUSA TENGGARA TIMUR 180 Phase 1 38 32 262 7.0 120.42926 -8.75682 12542 5304110004 LILO NUSA TENGGARA TIMUR 83 Phase 1 20 14 060 3.0 124.71175 -9.70997 12543 5309061008 KAWELA NUSA TENGGARA TIMUR 1 446 Phase 2 348 295 452 63.7 123.07048 -8.35717 12544 8106011007 LUHUTUBAN MALUKU 642 Phase 3 150 153 900 29.1 127.59834 -3.34763 12545 5302051003 HANGGARORU NUSA TENGGARA TIMUR 75 Phase 3 19 13 357 2.9 120.64673 -9.99899 12546 8204061003 BUSUA MALUKU UTARA 2 123 Phase 2 506 519 156 104.6 127.12915 -0.20874 12547 5313040017 GARA NUSA TENGGARA TIMUR 260 Phase 1 54 45 846 9.9 120.43119 -8.75656 12548 5304110004 LILO NUSA TENGGARA TIMUR 104 Phase 1 25 17 575 3.8 124.71041 -9.71051 12549 5309071016 LAMABAYUNG NUSA TENGGARA TIMUR 758 Phase 2 102 86 598 18.7 123.27214 -8.34692 Annex II – Demand forecast results Page 30 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 12550 8106011007 LUHUTUBAN MALUKU 457 Phase 3 107 109 782 20.8 127.58999 -3.34718 12551 5302051003 HANGGARORU NUSA TENGGARA TIMUR 98 Phase 3 24 16 872 3.6 120.64222 -10.00163 12552 8204061001 BOKIMIAKE MALUKU UTARA 598 Phase 2 122 125 172 25.2 127.09869 -0.23165 12553 5313040018 WAE AJANG NUSA TENGGARA TIMUR 320 Phase 1 67 56 883 12.3 120.42735 -8.74919 12554 5304110005 TAUANAS NUSA TENGGARA TIMUR 42 Phase 1 17 11 951 2.6 124.71920 -9.71594 12555 5307060025 ALILA SELATAN NUSA TENGGARA TIMUR 370 Phase 2 97 82 353 17.8 124.50880 -8.15761 12556 8106011005 KELANG ASAUDE MALUKU 839 Phase 3 404 414 504 78.4 127.55814 -3.33815 12557 5302051003 HANGGARORU NUSA TENGGARA TIMUR 60 Phase 3 15 10 545 2.3 120.64129 -10.00123 12558 8204051008 SIDANGA MALUKU UTARA 419 Phase 2 125 128 250 25.8 127.09021 -0.25369 12559 5312030005 SADHA NUSA TENGGARA TIMUR 289 Phase 1 66 56 034 12.1 121.08549 -8.87146 12560 5304110005 TAUANAS NUSA TENGGARA TIMUR 66 Phase 1 26 18 278 3.9 124.72135 -9.71896 12561 5308011012 POSIWATU NUSA TENGGARA TIMUR 267 Phase 2 75 63 675 13.7 123.39783 -8.51826 12562 8106011004 TUMALEHU TIMUR MALUKU 274 Phase 3 60 61 560 11.6 127.54675 -3.33756 12563 5302051003 HANGGARORU NUSA TENGGARA TIMUR 120 Phase 3 29 20 387 4.4 120.65272 -10.00879 12564 8204051007 LATA LATA MALUKU UTARA 479 Phase 2 141 144 666 29.1 127.06415 -0.27145 12565 5312030003 WERE II NUSA TENGGARA TIMUR 825 Phase 1 184 156 216 33.7 121.08698 -8.88213 12566 5304110005 TAUANAS NUSA TENGGARA TIMUR 92 Phase 1 36 25 308 5.5 124.72388 -9.72068 12567 5308011014 PUOR B NUSA TENGGARA TIMUR 204 Phase 2 57 48 393 10.4 123.40477 -8.48648 12568 8106011003 TUMALEHU BARAT MALUKU 971 Phase 3 302 309 852 58.6 127.54159 -3.31421 12569 5302051003 HANGGARORU NUSA TENGGARA TIMUR 44 Phase 3 11 7 733 1.7 120.66311 -10.01623 12570 8204042004 TABAPOMA MALUKU UTARA 389 Phase 2 115 117 990 23.8 127.79102 -0.68263 12571 5313130007 PINGGANG NUSA TENGGARA TIMUR 27 Phase 1 7 5 943 1.3 120.53059 -8.49930 12572 5304110005 TAUANAS NUSA TENGGARA TIMUR 264 Phase 1 103 72 409 15.6 124.72653 -9.71893 12573 5308011014 PUOR B NUSA TENGGARA TIMUR 337 Phase 2 93 78 957 17.0 123.40632 -8.48233 12574 8103142011 SARIPUTIH MALUKU 1 497 Phase 3 364 373 464 70.6 129.75781 -2.91098 12575 5302051003 HANGGARORU NUSA TENGGARA TIMUR 137 Phase 3 33 23 199 5.0 120.66727 -10.01758 12576 8204042005 TUTUPA MALUKU UTARA 490 Phase 2 133 136 458 27.5 127.80931 -0.68605 12577 5311061009 LOBONIKI NUSA TENGGARA TIMUR 127 Phase 1 32 27 168 5.9 121.91341 -8.50186 12578 5304110005 TAUANAS NUSA TENGGARA TIMUR 143 Phase 1 56 39 368 8.5 124.72898 -9.72102 12579 5308020012 ILE KERBAU NUSA TENGGARA TIMUR 288 Phase 2 95 80 655 17.4 123.40691 -8.48033 12580 8103142003 MANEO RENDAH MALUKU 849 Phase 3 256 262 656 49.7 129.77981 -2.88366 12581 5302051003 HANGGARORU NUSA TENGGARA TIMUR 243 Phase 3 59 41 477 8.9 120.66264 -10.01979 12582 8205031004 BIRINOA MALUKU UTARA 394 Phase 2 104 106 704 21.5 127.92451 1.52310 12583 5311061009 LOBONIKI NUSA TENGGARA TIMUR 316 Phase 1 79 67 071 14.5 121.91877 -8.49343 12584 5304110005 TAUANAS NUSA TENGGARA TIMUR 102 Phase 1 40 28 120 6.1 124.72246 -9.72620 12585 5309071008 LEWOPAO NUSA TENGGARA TIMUR 10 Phase 2 3 2 547 0.5 123.26085 -8.37255 12586 8106011002 BUANO HATUPUTIH MALUKU 338 Phase 3 79 81 054 15.3 127.51527 -3.33218 12587 5302051002 LAI LANJANG NUSA TENGGARA TIMUR 250 Phase 3 60 42 180 9.1 120.66057 -10.02758 12588 8204042006 TOMARA MALUKU UTARA 586 Phase 2 150 153 900 31.0 127.84313 -0.70883 12589 5311061010 NDONDO NUSA TENGGARA TIMUR 717 Phase 1 172 146 028 31.5 121.92794 -8.49122 12590 5304110005 TAUANAS NUSA TENGGARA TIMUR 79 Phase 1 31 21 793 4.7 124.72624 -9.73251 12591 5310040018 NEBE NUSA TENGGARA TIMUR 386 Phase 2 96 81 504 17.6 122.59277 -8.49077 12592 8106011001 TUNIWARA MALUKU 239 Phase 3 61 62 586 11.8 127.51465 -3.33144 12593 5302051002 LAI LANJANG NUSA TENGGARA TIMUR 46 Phase 3 11 7 733 1.7 120.66158 -10.03285 12594 8204030040 SUMAE MALUKU UTARA 688 Phase 2 147 150 822 30.4 127.37216 -0.58605 12595 5315030007 MUNTING NUSA TENGGARA TIMUR 836 Phase 1 192 163 008 35.2 120.21904 -8.71850 12596 5304110005 TAUANAS NUSA TENGGARA TIMUR 86 Phase 1 34 23 902 5.2 124.73300 -9.73177 12597 5310040018 NEBE NUSA TENGGARA TIMUR 129 Phase 2 32 27 168 5.9 122.59634 -8.47205 12598 8106011001 TUNIWARA MALUKU 346 Phase 3 89 91 314 17.3 127.50178 -3.32063 12599 5302051002 LAI LANJANG NUSA TENGGARA TIMUR 24 Phase 3 6 4 218 0.9 120.66489 -10.03173 12600 8203050008 SAMUYA MALUKU UTARA 1 078 Phase 2 267 273 942 55.2 125.28463 -1.79101 12601 5313130008 GOLO NUSA TENGGARA TIMUR 53 Phase 1 15 12 735 2.7 120.51328 -8.50727 12602 5304110005 TAUANAS NUSA TENGGARA TIMUR 166 Phase 1 65 45 695 9.9 124.74396 -9.73124 12603 5310040022 WAILAMUNG NUSA TENGGARA TIMUR 129 Phase 2 33 28 017 6.0 122.59817 -8.46439 12604 8106031005 WAIHATU MALUKU 774 Phase 3 204 209 304 39.6 128.34215 -3.27870 12605 5302051002 LAI LANJANG NUSA TENGGARA TIMUR 189 Phase 3 45 31 635 6.8 120.67091 -10.02874 12606 8204042007 WAYATIM MALUKU UTARA 247 Phase 2 68 69 768 14.1 127.87341 -0.74403 12607 5313130008 GOLO NUSA TENGGARA TIMUR 92 Phase 1 26 22 074 4.8 120.51100 -8.50438 12608 5304110005 TAUANAS NUSA TENGGARA TIMUR 119 Phase 1 47 33 041 7.1 124.74577 -9.73393 12609 5310040022 WAILAMUNG NUSA TENGGARA TIMUR 427 Phase 2 109 92 541 20.0 122.61219 -8.45048 12610 8103141011 HORALE MALUKU 162 Phase 3 35 35 910 6.8 129.08290 -2.93947 12611 5302051003 HANGGARORU NUSA TENGGARA TIMUR 132 Phase 3 32 22 496 4.9 120.67106 -10.02670 12612 8204041007 PIGARAJA MALUKU UTARA 1 281 Phase 2 320 328 320 66.1 127.87500 -0.81583 12613 5304111007 LOBUS NUSA TENGGARA TIMUR 31 Phase 1 15 10 545 2.3 124.74958 -9.73520 12614 5313130008 GOLO NUSA TENGGARA TIMUR 42 Phase 1 12 10 188 2.2 120.50802 -8.49806 12615 5310040021 OJANG NUSA TENGGARA TIMUR 116 Phase 2 29 24 621 5.3 122.63699 -8.45079 12616 8103141012 SALEMAN MALUKU 364 Phase 3 78 80 028 15.1 129.10302 -2.94938 12617 5302032006 KATIKU LUKU NUSA TENGGARA TIMUR 640 Phase 3 163 114 589 24.7 120.32277 -9.94759 12618 8202032001 GEMAF MALUKU UTARA 817 Phase 2 176 180 576 36.4 128.03198 0.47648 12619 5304111007 LOBUS NUSA TENGGARA TIMUR 46 Phase 1 23 16 169 3.5 124.75044 -9.73486 12620 5313130008 GOLO NUSA TENGGARA TIMUR 61 Phase 1 17 14 433 3.1 120.50472 -8.49572 12621 5310040021 OJANG NUSA TENGGARA TIMUR 310 Phase 2 76 64 524 13.9 122.64828 -8.45792 12622 8103141012 SALEMAN MALUKU 1 242 Phase 3 265 271 890 51.4 129.11510 -2.95635 12623 8202032002 SAGEA MALUKU UTARA 790 Phase 2 174 178 524 36.0 128.09650 0.46214 12624 5302041004 LAI PANDAK NUSA TENGGARA TIMUR 519 Phase 3 131 92 093 19.9 120.51973 -10.19657 12625 5304111007 LOBUS NUSA TENGGARA TIMUR 27 Phase 1 14 9 842 2.1 124.75167 -9.73509 12626 5313130008 GOLO NUSA TENGGARA TIMUR 210 Phase 1 58 49 242 10.6 120.50398 -8.49848 12627 5310040021 OJANG NUSA TENGGARA TIMUR 596 Phase 2 146 123 954 26.7 122.64949 -8.45905 12628 8171010004 AMAHUSU MALUKU 12 Phase 3 4 4 104 0.8 128.16673 -3.71684 12629 8202032009 KIYA MALUKU UTARA 597 Phase 3 142 145 692 29.4 128.09789 0.46237 12630 5316030008 BULU BOKAT UTARA NUSA TENGGARA TIMUR 830 Phase 3 183 128 649 27.8 119.66626 -9.48887 12631 5304111007 LOBUS NUSA TENGGARA TIMUR 66 Phase 1 32 22 496 4.9 124.75354 -9.73569 12632 5313130008 GOLO NUSA TENGGARA TIMUR 466 Phase 1 128 108 672 23.4 120.50804 -8.49315 12633 5310040026 TIMUTAWA NUSA TENGGARA TIMUR 86 Phase 2 22 18 678 4.0 122.65924 -8.46971 12634 8171010006 KEL BENTENG MALUKU 80 Phase 3 18 18 468 3.5 128.16437 -3.71675 Annex II – Demand forecast results Page 31 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 12635 8202032003 FRITU MALUKU UTARA 626 Phase 3 154 158 004 31.8 128.11981 0.45441 12636 5316030010 NGADU BOLU NUSA TENGGARA TIMUR 784 Phase 3 204 143 412 30.9 119.67825 -9.43236 12637 5304111007 LOBUS NUSA TENGGARA TIMUR 350 Phase 1 170 119 510 25.8 124.76313 -9.73023 12638 5312020010 BEJA NUSA TENGGARA TIMUR 450 Phase 1 96 81 504 17.6 120.96116 -8.84168 12639 5310040026 TIMUTAWA NUSA TENGGARA TIMUR 126 Phase 2 32 27 168 5.9 122.66197 -8.48841 12640 8106031006 LOHIATALA MALUKU 712 Phase 3 153 156 978 29.7 128.35020 -3.26926 12641 8205011011 MAKAELING MALUKU UTARA 417 Phase 3 95 97 470 19.6 127.69442 1.05271 12642 5316030009 LENANG NUSA TENGGARA TIMUR 979 Phase 3 286 201 058 43.4 119.75647 -9.40434 12643 5304111007 LOBUS NUSA TENGGARA TIMUR 203 Phase 1 99 69 597 15.0 124.76258 -9.72626 12644 5318060003 DHAWE NUSA TENGGARA TIMUR 59 Phase 1 14 11 886 2.6 121.24438 -8.58034 12645 5310040026 TIMUTAWA NUSA TENGGARA TIMUR 229 Phase 2 58 49 242 10.6 122.64997 -8.49145 12646 8109020018 LIANG MALUKU 664 Phase 3 134 137 484 26.0 126.55301 -3.74119 12647 8204030041 KAPUTUSAN MALUKU UTARA 677 Phase 3 177 181 602 36.6 127.36136 -0.55621 12648 5316030009 LENANG NUSA TENGGARA TIMUR 831 Phase 3 243 170 829 36.9 119.75577 -9.39818 12649 5304111007 LOBUS NUSA TENGGARA TIMUR 277 Phase 1 134 94 202 20.3 124.75686 -9.72420 12650 5318060003 DHAWE NUSA TENGGARA TIMUR 39 Phase 1 9 7 641 1.6 121.24282 -8.58013 12651 5310040026 TIMUTAWA NUSA TENGGARA TIMUR 247 Phase 2 63 53 487 11.5 122.64866 -8.50210 12652 8104023001 ILATH MALUKU 345 Phase 3 74 75 924 14.4 127.24844 -3.54575 12653 8203050006 PARIGI MALUKU UTARA 927 Phase 3 217 222 642 44.9 125.19781 -1.73461 12654 5302032005 PRAI BOKUL NUSA TENGGARA TIMUR 1 170 Phase 3 185 130 055 28.1 120.29452 -10.01110 12655 5304110005 TAUANAS NUSA TENGGARA TIMUR 53 Phase 1 21 14 763 3.2 124.72440 -9.73766 12656 5318060003 DHAWE NUSA TENGGARA TIMUR 174 Phase 1 40 33 960 7.3 121.23660 -8.57953 12657 5310040020 KRINGA NUSA TENGGARA TIMUR 876 Phase 2 221 187 629 40.5 122.64158 -8.50527 12658 8104023002 WAEMORAT MALUKU 740 Phase 3 171 175 446 33.2 127.24873 -3.52384 12659 8203050007 PENU MALUKU UTARA 870 Phase 3 164 168 264 33.9 125.10822 -1.70010 12660 5302032005 PRAI BOKUL NUSA TENGGARA TIMUR 48 Phase 3 10 7 030 1.5 120.29232 -10.01169 12661 5304111001 OELEU NUSA TENGGARA TIMUR 149 Phase 1 45 31 635 6.8 124.73136 -9.74448 12662 5318060003 DHAWE NUSA TENGGARA TIMUR 184 Phase 1 42 35 658 7.7 121.23541 -8.58244 12663 5310040020 KRINGA NUSA TENGGARA TIMUR 372 Phase 2 94 79 806 17.2 122.63082 -8.49696 12664 8104023002 WAEMORAT MALUKU 393 Phase 3 91 93 366 17.7 127.24909 -3.49792 12665 8203050009 TUBANG MALUKU UTARA 166 Phase 3 43 44 118 8.9 125.09919 -1.76165 12666 5302032004 KATIKUTANA NUSA TENGGARA TIMUR 483 Phase 3 115 80 845 17.4 120.28201 -10.01884 12667 5304111001 OELEU NUSA TENGGARA TIMUR 205 Phase 1 61 42 883 9.3 124.73584 -9.74149 12668 5318060003 DHAWE NUSA TENGGARA TIMUR 529 Phase 1 121 102 729 22.2 121.23347 -8.58221 12669 5310040019 HIKONG NUSA TENGGARA TIMUR 314 Phase 2 70 59 430 12.8 122.65588 -8.51927 12670 8104023002 WAEMORAT MALUKU 140 Phase 3 33 33 858 6.4 127.24913 -3.49510 12671 8203050009 TUBANG MALUKU UTARA 421 Phase 3 108 110 808 22.3 125.09593 -1.76127 12672 5302032001 KARIPI NUSA TENGGARA TIMUR 516 Phase 3 108 75 924 16.4 120.31031 -10.05255 12673 5304111001 OELEU NUSA TENGGARA TIMUR 253 Phase 1 75 52 725 11.4 124.73194 -9.74780 12674 5318060003 DHAWE NUSA TENGGARA TIMUR 180 Phase 1 41 34 809 7.5 121.23235 -8.58147 12675 5310040019 HIKONG NUSA TENGGARA TIMUR 424 Phase 2 94 79 806 17.2 122.65865 -8.52231 12676 8109040004 SIMI MALUKU 403 Phase 3 97 99 522 18.8 127.11525 -3.66524 12677 8203051007 BELO MALUKU UTARA 265 Phase 3 58 59 508 12.0 125.13624 -1.87441 12678 5302030025 WINU MURU NUSA TENGGARA TIMUR 437 Phase 3 107 75 221 16.2 120.33607 -10.06952 12679 5304111001 OELEU NUSA TENGGARA TIMUR 299 Phase 1 89 62 567 13.5 124.73725 -9.74685 12680 5315030020 WAE KANTA NUSA TENGGARA TIMUR 260 Phase 1 57 48 393 10.4 120.25721 -8.67112 12681 5310040019 HIKONG NUSA TENGGARA TIMUR 344 Phase 2 76 64 524 13.9 122.65264 -8.52477 12682 8107040011 WAIMATAKABU MALUKU 283 Phase 3 78 80 028 15.1 130.17451 -3.02948 12683 8203051005 WAI KADAI MALUKU UTARA 528 Phase 3 113 115 938 23.4 125.15695 -1.87169 12684 5302031010 JANGGA MANGU NUSA TENGGARA TIMUR 273 Phase 3 69 48 507 10.5 120.33785 -10.09190 12685 5314020013 OEBELA NUSA TENGGARA TIMUR 1 146 Phase 1 273 191 919 41.4 122.89400 -10.82169 12686 5315030020 WAE KANTA NUSA TENGGARA TIMUR 329 Phase 1 72 61 128 13.2 120.25193 -8.66921 12687 5310040019 HIKONG NUSA TENGGARA TIMUR 241 Phase 2 54 45 846 9.9 122.64408 -8.52839 12688 8109030003 LEKTAMA MALUKU 351 Phase 3 71 72 846 13.8 126.70800 -3.84935 12689 8203051004 LOSSENG MALUKU UTARA 448 Phase 3 80 82 080 16.5 125.03331 -1.87617 12690 5302031010 JANGGA MANGU NUSA TENGGARA TIMUR 495 Phase 3 124 87 172 18.8 120.32964 -10.10289 12691 5304111001 OELEU NUSA TENGGARA TIMUR 94 Phase 1 28 19 684 4.2 124.73140 -9.75342 12692 5313040018 WAE AJANG NUSA TENGGARA TIMUR 347 Phase 1 73 61 977 13.4 120.42877 -8.75115 12693 5310040019 HIKONG NUSA TENGGARA TIMUR 215 Phase 2 48 40 752 8.8 122.63182 -8.53167 12694 8109040004 SIMI MALUKU 33 Phase 3 8 8 208 1.6 127.11010 -3.66831 12695 8203051004 LOSSENG MALUKU UTARA 525 Phase 3 93 95 418 19.2 125.01600 -1.91173 12696 5302031005 NANGGA NUSA TENGGARA TIMUR 744 Phase 3 166 116 698 25.2 120.31516 -10.13317 12697 5304111001 OELEU NUSA TENGGARA TIMUR 166 Phase 1 50 35 150 7.6 124.73490 -9.76203 12698 5313041010 GOLO ROPONG NUSA TENGGARA TIMUR 213 Phase 1 54 45 846 9.9 120.36145 -8.75594 12699 5310040019 HIKONG NUSA TENGGARA TIMUR 103 Phase 2 23 19 527 4.2 122.62547 -8.53506 12700 8109040004 SIMI MALUKU 661 Phase 3 159 163 134 30.9 127.08788 -3.68133 12701 8203051003 KAWADANG MALUKU UTARA 991 Phase 3 185 189 810 38.2 124.98906 -1.93073 12702 5302035001 PRAI WITU NUSA TENGGARA TIMUR 265 Phase 3 59 41 477 8.9 120.35423 -10.17074 12703 5304104004 MANUFUI NUSA TENGGARA TIMUR 195 Phase 1 50 35 150 7.6 124.74942 -9.76479 12704 5313130024 LATUNG NUSA TENGGARA TIMUR 603 Phase 1 133 112 917 24.4 120.43642 -8.44192 12705 5310042013 WERANG NUSA TENGGARA TIMUR 208 Phase 2 50 42 450 9.2 122.61870 -8.55464 12706 8109010003 FOGI MALUKU 162 Phase 3 39 40 014 7.6 126.00886 -3.35308 12707 8203051002 SOFAN MALUKU UTARA 910 Phase 3 223 228 798 46.1 124.94526 -1.92650 12708 5302035001 PRAI WITU NUSA TENGGARA TIMUR 76 Phase 3 17 11 951 2.6 120.35270 -10.17420 12709 5304104004 MANUFUI NUSA TENGGARA TIMUR 288 Phase 1 73 51 319 11.1 124.75063 -9.76553 12710 5313130015 LANDO NUSA TENGGARA TIMUR 518 Phase 1 123 104 427 22.5 120.51865 -8.44738 12711 5310042013 WERANG NUSA TENGGARA TIMUR 586 Phase 2 139 118 011 25.5 122.61332 -8.56271 12712 8109010003 FOGI MALUKU 518 Phase 3 124 127 224 24.1 126.01868 -3.33725 12713 8203051001 KABUNU MALUKU UTARA 588 Phase 3 139 142 614 28.7 124.89574 -1.92565 12714 5302035001 PRAI WITU NUSA TENGGARA TIMUR 30 Phase 3 7 4 921 1.1 120.35614 -10.17747 12715 5304101013 BAUS NUSA TENGGARA TIMUR 387 Phase 1 115 80 845 17.4 124.75489 -9.77595 12716 5311020014 EMBURIA NUSA TENGGARA TIMUR 242 Phase 1 62 52 638 11.4 121.61428 -8.80253 12717 5310042013 WERANG NUSA TENGGARA TIMUR 212 Phase 2 51 43 299 9.3 122.61420 -8.56882 12718 8109010010 AIR TERNATE MALUKU 936 Phase 3 189 193 914 36.7 126.00663 -3.26910 12719 8203064003 TABONA MALUKU UTARA 1 203 Phase 3 246 252 396 50.9 124.86494 -1.89164 Annex II – Demand forecast results Page 32 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 12720 5302035001 PRAI WITU NUSA TENGGARA TIMUR 438 Phase 3 97 68 191 14.7 120.35148 -10.19098 12721 5304101013 BAUS NUSA TENGGARA TIMUR 77 Phase 1 23 16 169 3.5 124.75077 -9.78346 12722 5313040012 LANGGO NUSA TENGGARA TIMUR 722 Phase 1 146 123 954 26.7 120.47864 -8.81463 12723 5310042013 WERANG NUSA TENGGARA TIMUR 264 Phase 2 63 53 487 11.5 122.60346 -8.55243 12724 8109010004 PASIR PUTIH MALUKU 265 Phase 3 56 57 456 10.9 126.00207 -3.24542 12725 8203064003 TABONA MALUKU UTARA 177 Phase 3 37 37 962 7.6 124.85965 -1.89122 12726 5302035002 KAKAHA NUSA TENGGARA TIMUR 124 Phase 3 35 24 605 5.3 120.35310 -10.20609 12727 5304101013 BAUS NUSA TENGGARA TIMUR 22 Phase 1 7 4 921 1.1 124.74972 -9.78387 12728 5313130008 GOLO NUSA TENGGARA TIMUR 89 Phase 1 25 21 225 4.6 120.51447 -8.49385 12729 5310042013 WERANG NUSA TENGGARA TIMUR 222 Phase 2 53 44 997 9.7 122.60429 -8.54517 12730 8109010004 PASIR PUTIH MALUKU 2 059 Phase 3 434 445 284 84.2 126.00600 -3.23910 12731 8203064003 TABONA MALUKU UTARA 73 Phase 3 15 15 390 3.1 124.85410 -1.89256 12732 5302035002 KAKAHA NUSA TENGGARA TIMUR 208 Phase 3 24 16 872 3.6 120.35156 -10.21354 12733 5304101013 BAUS NUSA TENGGARA TIMUR 24 Phase 1 8 5 624 1.2 124.74322 -9.78900 12734 5313130008 GOLO NUSA TENGGARA TIMUR 155 Phase 1 43 36 507 7.9 120.51561 -8.49542 12735 5310042024 ILINMEDO NUSA TENGGARA TIMUR 61 Phase 2 16 13 584 2.9 122.58896 -8.56531 12736 8106031006 LOHIATALA MALUKU 332 Phase 3 72 73 872 14.0 128.40419 -3.20248 12737 8203064003 TABONA MALUKU UTARA 31 Phase 3 7 7 182 1.4 124.85187 -1.89291 12738 5302035002 KAKAHA NUSA TENGGARA TIMUR 538 Phase 3 149 104 747 22.6 120.35427 -10.22511 12739 5304104004 MANUFUI NUSA TENGGARA TIMUR 202 Phase 1 52 36 556 7.9 124.73617 -9.78951 12740 5319010019 GOLO ROS NUSA TENGGARA TIMUR 11 Phase 1 3 2 547 0.5 120.55486 -8.72708 12741 5310042024 ILINMEDO NUSA TENGGARA TIMUR 98 Phase 2 25 21 225 4.6 122.58944 -8.56665 12742 8106032001 RUMBERU MALUKU 1 360 Phase 3 332 340 632 64.4 128.42988 -3.18496 12743 8203064003 TABONA MALUKU UTARA 627 Phase 3 128 131 328 26.5 124.84826 -1.89293 12744 5302035002 KAKAHA NUSA TENGGARA TIMUR 58 Phase 3 16 11 248 2.4 120.35701 -10.22985 12745 5304104004 MANUFUI NUSA TENGGARA TIMUR 976 Phase 1 247 173 641 37.5 124.72532 -9.78961 12746 5319010019 GOLO ROS NUSA TENGGARA TIMUR 313 Phase 1 74 62 826 13.6 120.55160 -8.72060 12747 5310042014 TANARAWA NUSA TENGGARA TIMUR 187 Phase 2 50 42 450 9.2 122.59002 -8.57747 12748 8203064002 PENCADO MALUKU UTARA 1 980 Phase 3 430 441 180 88.9 124.78666 -1.90988 12749 8106032001 RUMBERU MALUKU 296 Phase 3 73 74 898 14.2 128.44404 -3.21722 12750 5302035002 KAKAHA NUSA TENGGARA TIMUR 30 Phase 3 9 6 327 1.4 120.35929 -10.23416 12751 5304104004 MANUFUI NUSA TENGGARA TIMUR 183 Phase 1 47 33 041 7.1 124.71690 -9.78847 12752 5319010019 GOLO ROS NUSA TENGGARA TIMUR 364 Phase 1 86 73 014 15.8 120.54360 -8.71058 12753 5310042014 TANARAWA NUSA TENGGARA TIMUR 473 Phase 2 125 106 125 22.9 122.59724 -8.58741 12754 8203064007 SUMBONG MALUKU UTARA 664 Phase 3 112 114 912 23.2 124.73269 -1.90827 12755 8106032002 HONITETU MALUKU 1 547 Phase 3 286 293 436 55.5 128.45059 -3.23359 12756 5302035002 KAKAHA NUSA TENGGARA TIMUR 30 Phase 3 9 6 327 1.4 120.36334 -10.23819 12757 5304104004 MANUFUI NUSA TENGGARA TIMUR 654 Phase 1 166 116 698 25.2 124.71334 -9.78681 12758 5319010019 GOLO ROS NUSA TENGGARA TIMUR 636 Phase 1 149 126 501 27.3 120.54002 -8.70695 12759 5310042014 TANARAWA NUSA TENGGARA TIMUR 368 Phase 2 97 82 353 17.8 122.60238 -8.59580 12760 8203064001 BAPENU MALUKU UTARA 1 741 Phase 3 358 367 308 74.0 124.66789 -1.88239 12761 8106040004 BURIA MALUKU 1 225 Phase 3 240 246 240 46.6 128.52980 -2.98867 12762 5302035002 KAKAHA NUSA TENGGARA TIMUR 345 Phase 3 95 66 785 14.4 120.36983 -10.24014 12763 5304104004 MANUFUI NUSA TENGGARA TIMUR 410 Phase 1 104 73 112 15.8 124.70786 -9.79023 12764 5319010020 SANO LOKON NUSA TENGGARA TIMUR 204 Phase 1 43 36 507 7.9 120.54684 -8.70440 12765 5310042012 PRUDA NUSA TENGGARA TIMUR 263 Phase 2 64 54 336 11.7 122.61761 -8.60771 12766 8203064005 BAHU MALUKU UTARA 893 Phase 3 188 192 888 38.9 124.63492 -1.89287 12767 8104021014 WAENETAT MALUKU 234 Phase 3 66 67 716 12.8 126.96989 -3.36849 12768 5302035002 KAKAHA NUSA TENGGARA TIMUR 33 Phase 3 10 7 030 1.5 120.37722 -10.23985 12769 5304104002 SANTIAN NUSA TENGGARA TIMUR 794 Phase 1 167 117 401 25.3 124.69462 -9.79373 12770 5319010020 SANO LOKON NUSA TENGGARA TIMUR 270 Phase 1 57 48 393 10.4 120.54831 -8.69757 12771 5310042012 PRUDA NUSA TENGGARA TIMUR 860 Phase 2 209 177 441 38.3 122.63073 -8.60747 12772 8203064004 KILO MALUKU UTARA 822 Phase 3 157 161 082 32.5 124.70999 -1.94673 12773 8107040006 BULA MALUKU 278 Phase 3 43 44 118 8.3 130.51947 -3.10368 12774 5302035003 HAMBA WUTANG NUSA TENGGARA TIMUR 866 Phase 3 181 127 243 27.5 120.38360 -10.24768 12775 5304104002 SANTIAN NUSA TENGGARA TIMUR 325 Phase 1 69 48 507 10.5 124.68970 -9.78816 12776 5319010020 SANO LOKON NUSA TENGGARA TIMUR 161 Phase 1 34 28 866 6.2 120.53992 -8.69560 12777 5310042012 PRUDA NUSA TENGGARA TIMUR 276 Phase 2 67 56 883 12.3 122.63506 -8.61260 12778 8204090006 WOSI MALUKU UTARA 620 Phase 3 157 161 082 32.5 127.96755 -0.18372 12779 8106032004 RAMBATU MALUKU 428 Phase 3 104 106 704 20.2 128.48632 -3.20764 12780 5302035002 KAKAHA NUSA TENGGARA TIMUR 73 Phase 3 21 14 763 3.2 120.35587 -10.23515 12781 5304104002 SANTIAN NUSA TENGGARA TIMUR 314 Phase 1 66 46 398 10.0 124.68553 -9.79092 12782 5319010020 SANO LOKON NUSA TENGGARA TIMUR 63 Phase 1 14 11 886 2.6 120.53171 -8.69157 12783 5310042012 PRUDA NUSA TENGGARA TIMUR 963 Phase 2 234 198 666 42.9 122.62884 -8.62179 12784 8204041006 WAYA KUBA MALUKU UTARA 361 Phase 3 105 107 730 21.7 127.84864 -0.83084 12785 8106032003 HUKUANAKOTA MALUKU 773 Phase 3 302 309 852 58.6 128.54550 -3.21233 12786 5302030010 KANANGGAR NUSA TENGGARA TIMUR 148 Phase 3 34 23 902 5.2 120.36297 -10.04532 12787 5306072004 LAKANMAU NUSA TENGGARA TIMUR 319 Phase 1 80 56 240 12.1 125.06581 -9.08149 12788 5319010019 GOLO ROS NUSA TENGGARA TIMUR 494 Phase 1 116 98 484 21.2 120.53144 -8.70017 12789 5308030020 DULITUKAN NUSA TENGGARA TIMUR 613 Phase 2 197 167 253 36.1 123.39872 -8.27039 12790 8204030047 SUMA TINGGI MALUKU UTARA 363 Phase 3 96 98 496 19.8 127.31776 -0.51740 12791 8106034003 WATUI MALUKU 31 Phase 3 302 309 852 58.6 128.60665 -3.23067 12792 5302030010 KANANGGAR NUSA TENGGARA TIMUR 1 082 Phase 3 168 118 104 25.5 120.36218 -10.04326 12793 5306072006 DUALASI NUSA TENGGARA TIMUR 25 Phase 1 6 4 218 0.9 125.06889 -9.07519 12794 5319010020 SANO LOKON NUSA TENGGARA TIMUR 151 Phase 1 32 27 168 5.9 120.53275 -8.68939 12795 5309010004 WAIULA NUSA TENGGARA TIMUR 247 Phase 2 50 42 450 9.2 122.72503 -8.59074 12796 8204050016 NONDANG MALUKU UTARA 787 Phase 3 176 180 576 36.4 127.29660 -0.47794 12797 8107011006 UTTA MALUKU 567 Phase 3 118 121 068 22.9 131.62429 -4.44198 12798 5302030010 KANANGGAR NUSA TENGGARA TIMUR 143 Phase 3 33 23 199 5.0 120.36574 -10.04555 12799 5306072006 DUALASI NUSA TENGGARA TIMUR 71 Phase 1 15 10 545 2.3 125.07093 -9.07478 12800 5319010020 SANO LOKON NUSA TENGGARA TIMUR 249 Phase 1 53 44 997 9.7 120.53013 -8.69092 12801 5309010002 HEWA NUSA TENGGARA TIMUR 1 284 Phase 2 299 253 851 54.8 122.70632 -8.59414 12802 8204050017 INDARI MALUKU UTARA 758 Phase 3 139 142 614 28.7 127.30382 -0.43391 12803 8104020002 SANLEKO MALUKU 61 Phase 3 16 16 416 3.1 127.03179 -3.29836 12804 5302030018 MEHANG MATA NUSA TENGGARA TIMUR 898 Phase 3 193 135 679 29.3 120.39335 -10.01401 Annex II – Demand forecast results Page 33 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 12805 5306072006 DUALASI NUSA TENGGARA TIMUR 302 Phase 1 63 44 289 9.6 125.07029 -9.07265 12806 5319010020 SANO LOKON NUSA TENGGARA TIMUR 113 Phase 1 24 20 376 4.4 120.52903 -8.68780 12807 5309010004 WAIULA NUSA TENGGARA TIMUR 86 Phase 2 18 15 282 3.3 122.73906 -8.60488 12808 8204050018 KUSUBIBI MALUKU UTARA 695 Phase 3 154 158 004 31.8 127.33295 -0.39593 12809 8104020002 SANLEKO MALUKU 182 Phase 3 46 47 196 8.9 127.03633 -3.29793 12810 5302032002 WANGGAMETI NUSA TENGGARA TIMUR 266 Phase 3 68 47 804 10.3 120.30128 -10.08530 12811 5306072005 RAIULUN NUSA TENGGARA TIMUR 348 Phase 1 91 63 973 13.8 125.08476 -9.08498 12812 5319010021 RONDO WOING NUSA TENGGARA TIMUR 213 Phase 1 41 34 809 7.5 120.52043 -8.68283 12813 5309010004 WAIULA NUSA TENGGARA TIMUR 964 Phase 2 192 163 008 35.2 122.74280 -8.60545 12814 8204052004 KOUBALABALA MALUKU UTARA 416 Phase 3 85 87 210 17.6 127.28334 -0.38061 12815 8103140010 SAWAI MALUKU 70 Phase 3 32 32 832 6.2 129.19293 -2.95372 12816 5302032002 WANGGAMETI NUSA TENGGARA TIMUR 265 Phase 3 68 47 804 10.3 120.27825 -10.07975 12817 5306072005 RAIULUN NUSA TENGGARA TIMUR 27 Phase 1 8 5 624 1.2 125.08618 -9.08753 12818 5319010021 RONDO WOING NUSA TENGGARA TIMUR 212 Phase 1 41 34 809 7.5 120.51905 -8.69088 12819 5309010004 WAIULA NUSA TENGGARA TIMUR 65 Phase 2 13 11 037 2.4 122.74542 -8.60681 12820 8204052003 LOLEO JAYA MALUKU UTARA 1 034 Phase 3 266 272 916 55.0 127.26451 -0.34869 12821 8103140010 SAWAI MALUKU 46 Phase 3 21 21 546 4.1 129.18671 -2.95879 12822 5302032003 KATIKUWAI NUSA TENGGARA TIMUR 1 253 Phase 3 243 170 829 36.9 120.21914 -10.07631 12823 5306072005 RAIULUN NUSA TENGGARA TIMUR 162 Phase 1 43 30 229 6.5 125.09264 -9.08472 12824 5319010021 RONDO WOING NUSA TENGGARA TIMUR 229 Phase 1 44 37 356 8.1 120.51770 -8.69145 12825 5309012001 RIANG BURA NUSA TENGGARA TIMUR 683 Phase 2 173 146 877 31.7 122.78023 -8.60693 12826 8204052005 LOLEO MEKAR MALUKU UTARA 284 Phase 3 78 80 028 16.1 127.25285 -0.33661 12827 8103140010 SAWAI MALUKU 268 Phase 3 122 125 172 23.7 129.18174 -2.95903 12828 5302021005 RAMUK NUSA TENGGARA TIMUR 738 Phase 3 157 110 371 23.8 120.16358 -10.06479 12829 5306071006 TOHE LETEN NUSA TENGGARA TIMUR 42 Phase 1 11 7 733 1.7 125.10447 -9.08006 12830 5319010021 RONDO WOING NUSA TENGGARA TIMUR 481 Phase 1 92 78 108 16.9 120.51381 -8.69023 12831 5309012002 LEWOAWANG NUSA TENGGARA TIMUR 319 Phase 2 87 73 863 15.9 122.79836 -8.60012 12832 8204090020 TANJUNG JERE MALUKU UTARA 354 Phase 3 89 91 314 18.4 127.97713 -0.23342 12833 8109040004 SIMI MALUKU 325 Phase 3 78 80 028 15.1 127.06517 -3.68388 12834 5302021005 RAMUK NUSA TENGGARA TIMUR 104 Phase 3 22 15 466 3.3 120.15789 -10.07204 12835 5306071006 TOHE LETEN NUSA TENGGARA TIMUR 220 Phase 1 55 38 665 8.3 125.10584 -9.07814 12836 5318060003 DHAWE NUSA TENGGARA TIMUR 408 Phase 1 93 78 957 17.0 121.23452 -8.60025 12837 5309012002 LEWOAWANG NUSA TENGGARA TIMUR 787 Phase 2 213 180 837 39.0 122.80638 -8.59719 12838 8204091008 TABAHIJRAH MALUKU UTARA 182 Phase 3 47 48 222 9.7 127.98227 -0.26589 12839 8109040008 WAETEBA MALUKU 601 Phase 3 137 140 562 26.6 127.03932 -3.69499 12840 5302021004 WANGGA BEWA NUSA TENGGARA TIMUR 924 Phase 3 215 151 145 32.6 120.13836 -10.12891 12841 5306071006 TOHE LETEN NUSA TENGGARA TIMUR 281 Phase 1 71 49 913 10.8 125.10850 -9.07777 12842 5318050002 LANGEDHAWE NUSA TENGGARA TIMUR 437 Phase 1 96 81 504 17.6 121.23064 -8.61297 12843 5307012008 MAWAR NUSA TENGGARA TIMUR 176 Phase 2 42 35 658 7.7 124.30741 -8.30373 12844 8204091007 MATUTING TANJUNG MALUKU UTARA 477 Phase 3 135 138 510 27.9 128.00212 -0.30379 12845 8103111001 LARIKE MALUKU 139 Phase 3 27 27 702 5.2 127.95558 -3.52873 12846 5302021003 LAILUNGGI NUSA TENGGARA TIMUR 148 Phase 3 34 23 902 5.2 120.11140 -10.16666 12847 5306071006 TOHE LETEN NUSA TENGGARA TIMUR 108 Phase 1 27 18 981 4.1 125.10879 -9.07508 12848 5318050002 LANGEDHAWE NUSA TENGGARA TIMUR 112 Phase 1 25 21 225 4.6 121.23037 -8.61593 12849 5307012008 MAWAR NUSA TENGGARA TIMUR 510 Phase 2 121 102 729 22.2 124.30456 -8.29965 12850 8204091006 MATUTING MALUKU UTARA 329 Phase 3 86 88 236 17.8 128.01077 -0.32114 12851 8103110004 ASILULU MALUKU 696 Phase 3 140 143 640 27.2 127.94315 -3.53565 12852 5302021003 LAILUNGGI NUSA TENGGARA TIMUR 87 Phase 3 20 14 060 3.0 120.10391 -10.16667 12853 5306071006 TOHE LETEN NUSA TENGGARA TIMUR 59 Phase 1 15 10 545 2.3 125.11125 -9.07233 12854 5318050002 LANGEDHAWE NUSA TENGGARA TIMUR 155 Phase 1 34 28 866 6.2 121.22835 -8.62741 12855 5309011010 WATOWARA NUSA TENGGARA TIMUR 145 Phase 2 41 34 809 7.5 122.77015 -8.35432 12856 8204091006 MATUTING MALUKU UTARA 263 Phase 3 69 70 794 14.3 128.01372 -0.32322 12857 8106034004 HUKU KECIL MALUKU 350 Phase 3 55 56 430 10.7 128.58329 -3.17118 12858 5302021003 LAILUNGGI NUSA TENGGARA TIMUR 50 Phase 3 12 8 436 1.8 120.10443 -10.17073 12859 5306071003 RAIFATUS NUSA TENGGARA TIMUR 99 Phase 1 26 18 278 3.9 125.11367 -9.07208 12860 5318050002 LANGEDHAWE NUSA TENGGARA TIMUR 418 Phase 1 92 78 108 16.9 121.22803 -8.63645 12861 5309011010 WATOWARA NUSA TENGGARA TIMUR 26 Phase 2 8 6 792 1.5 122.78087 -8.33804 12862 8204091005 TAGEA MALUKU UTARA 361 Phase 3 88 90 288 18.2 128.03862 -0.38540 12863 8106032004 RAMBATU MALUKU 438 Phase 3 107 109 782 20.8 128.58095 -3.14494 12864 5302021003 LAILUNGGI NUSA TENGGARA TIMUR 115 Phase 3 26 18 278 3.9 120.10361 -10.17258 12865 5306071003 RAIFATUS NUSA TENGGARA TIMUR 213 Phase 1 55 38 665 8.3 125.11584 -9.07220 12866 5318050002 LANGEDHAWE NUSA TENGGARA TIMUR 55 Phase 1 12 10 188 2.2 121.22725 -8.64022 12867 5309011010 WATOWARA NUSA TENGGARA TIMUR 129 Phase 2 36 30 564 6.6 122.78335 -8.33367 12868 8204091004 LELEWI MALUKU UTARA 269 Phase 3 80 82 080 16.5 128.05974 -0.42505 12869 8106034002 AHIOLO ABIO MALUKU 843 Phase 3 181 185 706 35.1 128.58225 -3.14368 12870 5302021003 LAILUNGGI NUSA TENGGARA TIMUR 96 Phase 3 22 15 466 3.3 120.11079 -10.17462 12871 5306071003 RAIFATUS NUSA TENGGARA TIMUR 394 Phase 1 101 71 003 15.3 125.12048 -9.07127 12872 5318050001 RENDUTENOE NUSA TENGGARA TIMUR 197 Phase 1 42 35 658 7.7 121.21746 -8.64065 12873 5309011014 DULI JAYA NUSA TENGGARA TIMUR 29 Phase 2 8 6 792 1.5 122.78415 -8.33235 12874 8204091003 BISUI MALUKU UTARA 1 098 Phase 3 299 306 774 61.8 128.08113 -0.46492 12875 8104020004 NAMLEA MALUKU 42 Phase 3 8 8 208 1.6 127.09850 -3.25950 12876 5302021003 LAILUNGGI NUSA TENGGARA TIMUR 810 Phase 3 183 128 649 27.8 120.11658 -10.17238 12877 5306071004 AITOUN NUSA TENGGARA TIMUR 321 Phase 1 98 68 894 14.9 125.12432 -9.06897 12878 5318050001 RENDUTENOE NUSA TENGGARA TIMUR 1 052 Phase 1 224 190 176 41.0 121.21546 -8.63117 12879 5309011014 DULI JAYA NUSA TENGGARA TIMUR 356 Phase 2 99 84 051 18.1 122.78792 -8.32172 12880 8204091002 LUIM MALUKU UTARA 220 Phase 3 52 53 352 10.7 128.09470 -0.49925 12881 8107040018 SESAR MALUKU 169 Phase 3 36 36 936 7.0 130.45921 -3.08774 12882 5302021002 TAWUI NUSA TENGGARA TIMUR 153 Phase 3 38 26 714 5.8 120.07550 -10.14847 12883 5306071004 AITOUN NUSA TENGGARA TIMUR 422 Phase 1 128 89 984 19.4 125.12783 -9.07129 12884 5318050003 TENGATIBA NUSA TENGGARA TIMUR 500 Phase 1 87 73 863 15.9 121.21847 -8.65098 12885 5309011011 SERINUHO NUSA TENGGARA TIMUR 643 Phase 2 158 134 142 28.9 122.78982 -8.31778 12886 8204091002 LUIM MALUKU UTARA 109 Phase 3 26 26 676 5.4 128.09527 -0.50038 12887 8103140042 MARAINA MALUKU 575 Phase 3 302 309 852 58.6 129.70672 -2.95715 12888 5302021002 TAWUI NUSA TENGGARA TIMUR 796 Phase 3 196 137 788 29.7 120.07378 -10.14376 12889 5306071004 AITOUN NUSA TENGGARA TIMUR 19 Phase 1 6 4 218 0.9 125.12389 -9.08159 Annex II – Demand forecast results Page 34 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 12890 5318050003 TENGATIBA NUSA TENGGARA TIMUR 730 Phase 1 126 106 974 23.1 121.21058 -8.65874 12891 5309011011 SERINUHO NUSA TENGGARA TIMUR 139 Phase 2 35 29 715 6.4 122.79503 -8.31675 12892 8204091001 TABAHIDAYAH MALUKU UTARA 498 Phase 3 119 122 094 24.6 128.10082 -0.51159 12893 8106020016 ETTY MALUKU 578 Phase 3 144 147 744 27.9 128.20012 -3.13239 12894 5302021002 TAWUI NUSA TENGGARA TIMUR 98 Phase 3 25 17 575 3.8 120.06231 -10.13727 12895 5306080011 FULUR NUSA TENGGARA TIMUR 62 Phase 1 17 11 951 2.6 125.13012 -9.08286 12896 5318050003 TENGATIBA NUSA TENGGARA TIMUR 914 Phase 1 158 134 142 28.9 121.22406 -8.66675 12897 5307010043 PANDAI NUSA TENGGARA TIMUR 450 Phase 2 97 82 353 17.8 124.26102 -8.18951 12898 8204092005 GAIMU MALUKU UTARA 199 Phase 3 55 56 430 11.4 128.12251 -0.53700 12899 8107020026 URUNG MALUKU 243 Phase 3 54 55 404 10.5 130.77786 -3.84802 12900 5302021002 TAWUI NUSA TENGGARA TIMUR 95 Phase 3 24 16 872 3.6 120.06125 -10.13643 12901 5306080011 FULUR NUSA TENGGARA TIMUR 276 Phase 1 75 52 725 11.4 125.13582 -9.07991 12902 5313040029 PONGKOR NUSA TENGGARA TIMUR 236 Phase 1 58 49 242 10.6 120.40659 -8.69212 12903 5308050009 LEWOLEBA UTARA NUSA TENGGARA TIMUR 2 672 Phase 2 168 142 632 30.8 123.38802 -8.38784 12904 8204092004 SAWAT MALUKU UTARA 233 Phase 3 79 81 054 16.3 128.14981 -0.57666 12905 8107020026 URUNG MALUKU 104 Phase 3 24 24 624 4.7 130.77769 -3.84464 12906 5302021002 TAWUI NUSA TENGGARA TIMUR 214 Phase 3 53 37 259 8.0 120.05324 -10.13064 12907 5306080011 FULUR NUSA TENGGARA TIMUR 16 Phase 1 5 3 515 0.8 125.13077 -9.08896 12908 5313040028 PAPANG NUSA TENGGARA TIMUR 337 Phase 1 82 69 618 15.0 120.41879 -8.69075 12909 5307012009 OMBAY NUSA TENGGARA TIMUR 31 Phase 2 9 7 641 1.6 124.30336 -8.28946 12910 8204092003 KUWO MALUKU UTARA 810 Phase 3 219 224 694 45.3 128.17328 -0.61516 12911 8107020026 URUNG MALUKU 233 Phase 3 52 53 352 10.1 130.76275 -3.82994 12912 5302021001 WAHANG NUSA TENGGARA TIMUR 1 166 Phase 3 283 198 949 42.9 120.02681 -10.09613 12913 5306080011 FULUR NUSA TENGGARA TIMUR 321 Phase 1 87 61 161 13.2 125.13338 -9.08959 12914 5313040028 PAPANG NUSA TENGGARA TIMUR 205 Phase 1 50 42 450 9.2 120.42264 -8.69370 12915 5307012009 OMBAY NUSA TENGGARA TIMUR 299 Phase 2 80 67 920 14.7 124.30356 -8.28342 12916 8204092002 RANGA RANGA MALUKU UTARA 690 Phase 3 192 196 992 39.7 128.19227 -0.65651 12917 8107020026 URUNG MALUKU 236 Phase 3 53 54 378 10.3 130.74812 -3.82749 12918 5302034006 HARAY NUSA TENGGARA TIMUR 521 Phase 3 142 99 826 21.5 120.50189 -10.14669 12919 5306080011 FULUR NUSA TENGGARA TIMUR 89 Phase 1 25 17 575 3.8 125.12952 -9.08911 12920 5313040021 UMUNG NUSA TENGGARA TIMUR 457 Phase 1 97 82 353 17.8 120.43054 -8.69491 12921 5307012009 OMBAY NUSA TENGGARA TIMUR 507 Phase 2 135 114 615 24.7 124.30204 -8.27849 12922 8204033003 SAWADAI MALUKU UTARA 389 Phase 3 99 101 574 20.5 127.44871 -0.71931 12923 8107020026 URUNG MALUKU 192 Phase 3 43 44 118 8.3 130.72994 -3.82337 12924 5302034005 LULUNDILU NUSA TENGGARA TIMUR 967 Phase 3 200 140 600 30.3 120.50659 -10.11537 12925 5306080011 FULUR NUSA TENGGARA TIMUR 25 Phase 1 7 4 921 1.1 125.12780 -9.08916 12926 5313041016 KOLE NUSA TENGGARA TIMUR 132 Phase 1 28 23 772 5.1 120.34782 -8.69270 12927 5309071015 DUABLOLONG NUSA TENGGARA TIMUR 667 Phase 2 138 117 162 25.3 123.29389 -8.33632 12928 8204092001 GANE LUAR MALUKU UTARA 1 596 Phase 3 413 423 738 85.4 128.21855 -0.70376 12929 8107020026 URUNG MALUKU 486 Phase 3 108 110 808 21.0 130.70995 -3.82389 12930 5302035004 KABANDA NUSA TENGGARA TIMUR 659 Phase 3 188 132 164 28.5 120.45662 -10.15505 12931 5306080009 LEOWALU NUSA TENGGARA TIMUR 399 Phase 1 115 80 845 17.4 125.12757 -9.09809 12932 5313041016 KOLE NUSA TENGGARA TIMUR 164 Phase 1 34 28 866 6.2 120.35079 -8.69641 12933 5308030019 TAGAWITI NUSA TENGGARA TIMUR 58 Phase 2 19 16 131 3.5 123.42482 -8.27754 12934 8204041005 LIARO MALUKU UTARA 940 Phase 3 253 259 578 52.3 127.77020 -0.86184 12935 8107022011 SUMBAWA MALUKU 8 Phase 3 3 3 078 0.6 130.70631 -3.82255 12936 5302034002 LA HIRU NUSA TENGGARA TIMUR 909 Phase 3 206 144 818 31.2 120.44146 -10.10680 12937 5306080009 LEOWALU NUSA TENGGARA TIMUR 32 Phase 1 10 7 030 1.5 125.12442 -9.10031 12938 5313041016 KOLE NUSA TENGGARA TIMUR 225 Phase 1 47 39 903 8.6 120.35488 -8.69360 12939 5310070007 NITAKLOANG NUSA TENGGARA TIMUR 254 Phase 2 71 60 279 13.0 122.14979 -8.65047 12940 8203031008 PASLAL MALUKU UTARA 282 Phase 3 62 63 612 12.8 125.80467 -1.90958 12941 8107022011 SUMBAWA MALUKU 182 Phase 3 56 57 456 10.9 130.69915 -3.81755 12942 5302040011 PAMBURU NUSA TENGGARA TIMUR 705 Phase 3 185 130 055 28.1 120.63457 -10.15709 12943 5306081006 EKIN NUSA TENGGARA TIMUR 231 Phase 1 60 42 180 9.1 125.12054 -9.10572 12944 5313040021 UMUNG NUSA TENGGARA TIMUR 163 Phase 1 35 29 715 6.4 120.43173 -8.69966 12945 5310042025 TUA BAO NUSA TENGGARA TIMUR 75 Phase 2 18 15 282 3.3 122.53955 -8.56122 12946 8203031001 BARU AKOL MALUKU UTARA 667 Phase 3 150 153 900 31.0 125.76670 -1.91989 12947 8107022011 SUMBAWA MALUKU 179 Phase 3 55 56 430 10.7 130.69590 -3.81105 12948 5302040014 TAMMA NUSA TENGGARA TIMUR 1 407 Phase 3 322 226 366 48.8 120.62077 -10.09803 12949 5306081006 EKIN NUSA TENGGARA TIMUR 47 Phase 1 13 9 139 2.0 125.12176 -9.10811 12950 5313040015 LUNGAR NUSA TENGGARA TIMUR 550 Phase 1 114 96 786 20.9 120.46060 -8.70481 12951 5308050008 LEWOLEBA BARAT NUSA TENGGARA TIMUR 3 597 Phase 2 105 89 145 19.2 123.38023 -8.39890 12952 8203042005 KAPORO MALUKU UTARA 95 Phase 3 18 18 468 3.7 125.71203 -1.92867 12953 8107022010 GUNAK MALUKU 196 Phase 3 98 100 548 19.0 130.67604 -3.80199 12954 5302021006 MAHA NIWA NUSA TENGGARA TIMUR 701 Phase 3 160 112 480 24.3 120.17587 -10.02645 12955 5306081006 EKIN NUSA TENGGARA TIMUR 80 Phase 1 21 14 763 3.2 125.12704 -9.11617 12956 5313040015 LUNGAR NUSA TENGGARA TIMUR 400 Phase 1 83 70 467 15.2 120.46247 -8.71081 12957 5308050014 PADA NUSA TENGGARA TIMUR 919 Phase 2 219 185 931 40.1 123.34919 -8.39529 12958 8203042005 KAPORO MALUKU UTARA 186 Phase 3 35 35 910 7.2 125.70670 -1.92900 12959 8107022010 GUNAK MALUKU 7 Phase 3 4 4 104 0.8 130.67181 -3.80213 12960 5302020010 WAIKANABU NUSA TENGGARA TIMUR 912 Phase 3 199 139 897 30.2 120.16259 -9.96537 12961 5306081006 EKIN NUSA TENGGARA TIMUR 140 Phase 1 37 26 011 5.6 125.12946 -9.11857 12962 5313040015 LUNGAR NUSA TENGGARA TIMUR 189 Phase 1 39 33 111 7.1 120.46441 -8.71333 12963 5308050007 WAIJARANG NUSA TENGGARA TIMUR 573 Phase 2 168 142 632 30.8 123.34280 -8.39901 12964 8203042005 KAPORO MALUKU UTARA 53 Phase 3 10 10 260 2.1 125.70570 -1.92904 12965 8107022010 GUNAK MALUKU 170 Phase 3 85 87 210 16.5 130.67010 -3.80251 12966 5302020011 KARITA NUSA TENGGARA TIMUR 1 221 Phase 3 229 160 987 34.7 120.10097 -9.93037 12967 5306081006 EKIN NUSA TENGGARA TIMUR 34 Phase 1 9 6 327 1.4 125.13006 -9.11962 12968 5313040020 MOCOK NUSA TENGGARA TIMUR 1 023 Phase 1 176 149 424 32.2 120.47121 -8.72630 12969 5309060042 WAI TUKAN NUSA TENGGARA TIMUR 707 Phase 2 88 74 712 16.1 123.12947 -8.27666 12970 8203042005 KAPORO MALUKU UTARA 183 Phase 3 35 35 910 7.2 125.70484 -1.92877 12971 8104030004 WAIMANGIT MALUKU 579 Phase 3 119 122 094 23.1 126.45039 -3.11643 12972 5302020003 BILLA NUSA TENGGARA TIMUR 263 Phase 3 61 42 883 9.3 120.08469 -9.94734 12973 5306081005 NUALAIN NUSA TENGGARA TIMUR 463 Phase 1 117 82 251 17.7 125.13458 -9.11965 12974 5313040020 MOCOK NUSA TENGGARA TIMUR 673 Phase 1 116 98 484 21.2 120.48156 -8.72223 Annex II – Demand forecast results Page 35 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 12975 5309021007 BALUK HERING NUSA TENGGARA TIMUR 1 674 Phase 2 120 101 880 22.0 122.92275 -8.21043 12976 8203042005 KAPORO MALUKU UTARA 161 Phase 3 30 30 780 6.2 125.70449 -1.92892 12977 8104030004 WAIMANGIT MALUKU 780 Phase 3 160 164 160 31.0 126.45099 -3.08498 12978 5302020003 BILLA NUSA TENGGARA TIMUR 883 Phase 3 202 142 006 30.6 120.08213 -9.94488 12979 5306081005 NUALAIN NUSA TENGGARA TIMUR 52 Phase 1 14 9 842 2.1 125.13874 -9.11988 12980 5313040015 LUNGAR NUSA TENGGARA TIMUR 369 Phase 1 76 64 524 13.9 120.46985 -8.70762 12981 5308060016 ARAMENGI NUSA TENGGARA TIMUR 695 Phase 2 131 111 219 24.0 123.73407 -8.27630 12982 8203042006 WAILAB MALUKU UTARA 767 Phase 3 149 152 874 30.8 125.67885 -1.92987 12983 8104030005 WAIPURE MALUKU 149 Phase 3 29 29 754 5.6 126.47357 -3.08443 12984 5302020003 BILLA NUSA TENGGARA TIMUR 150 Phase 3 35 24 605 5.3 120.07415 -9.94524 12985 5306081005 NUALAIN NUSA TENGGARA TIMUR 59 Phase 1 15 10 545 2.3 125.14104 -9.11893 12986 5312011005 NENOWEA NUSA TENGGARA TIMUR 135 Phase 1 47 39 903 8.6 121.00419 -8.90651 12987 5307011009 LEER NUSA TENGGARA TIMUR 352 Phase 2 86 73 014 15.8 124.07137 -8.38273 12988 8203042004 WAI KAFIA MALUKU UTARA 38 Phase 3 8 8 208 1.7 125.66486 -1.93015 12989 8104030005 WAIPURE MALUKU 181 Phase 3 35 35 910 6.8 126.48487 -3.08363 12990 5302020003 BILLA NUSA TENGGARA TIMUR 189 Phase 3 44 30 932 6.7 120.07183 -9.94895 12991 5306080010 DUARATO NUSA TENGGARA TIMUR 250 Phase 1 79 55 537 12.0 125.14685 -9.11319 12992 5312011005 NENOWEA NUSA TENGGARA TIMUR 237 Phase 1 82 69 618 15.0 121.01380 -8.91320 12993 5309010010 BORU KEDANG NUSA TENGGARA TIMUR 983 Phase 2 146 123 954 26.7 122.67135 -8.54562 12994 8203042004 WAI KAFIA MALUKU UTARA 107 Phase 3 22 22 572 4.5 125.66432 -1.93069 12995 8104030005 WAIPURE MALUKU 203 Phase 3 39 40 014 7.6 126.51710 -3.08016 12996 5302033001 MAU RAMBA NUSA TENGGARA TIMUR 503 Phase 3 113 79 439 17.1 120.39354 -9.98280 12997 5306080010 DUARATO NUSA TENGGARA TIMUR 158 Phase 1 50 35 150 7.6 125.14751 -9.10965 12998 5312011008 NARUWOLO II NUSA TENGGARA TIMUR 73 Phase 1 17 14 433 3.1 121.01481 -8.91292 12999 5309061009 BLIKO NUSA TENGGARA TIMUR 295 Phase 2 66 56 034 12.1 123.02231 -8.32748 13000 8203042004 WAI KAFIA MALUKU UTARA 329 Phase 3 67 68 742 13.8 125.66296 -1.93077 13001 8104030006 WAMLANA MALUKU 96 Phase 3 20 20 520 3.9 126.52266 -3.08280 13002 5302033009 MEO RUMBA NUSA TENGGARA TIMUR 1 116 Phase 3 269 189 107 40.8 120.39107 -9.93778 13003 5306080012 KEWAR NUSA TENGGARA TIMUR 721 Phase 1 211 148 333 32.0 125.15766 -9.10637 13004 5312011002 NARUWOLO NUSA TENGGARA TIMUR 124 Phase 1 32 27 168 5.9 121.02381 -8.90535 13005 5309050008 WATOHARI NUSA TENGGARA TIMUR 133 Phase 2 37 31 413 6.8 123.14624 -8.44599 13006 8203042004 WAI KAFIA MALUKU UTARA 481 Phase 3 98 100 548 20.3 125.66042 -1.93048 13007 8104030006 WAMLANA MALUKU 63 Phase 3 14 14 364 2.7 126.52679 -3.07195 13008 5302020013 WUDI PANDAK NUSA TENGGARA TIMUR 581 Phase 3 93 65 379 14.1 120.05708 -9.97177 13009 5306080009 LEOWALU NUSA TENGGARA TIMUR 195 Phase 1 57 40 071 8.6 125.14402 -9.10782 13010 5312011002 NARUWOLO NUSA TENGGARA TIMUR 903 Phase 1 229 194 421 42.0 121.02555 -8.90069 13011 5310052002 MEKENDETUN NUSA TENGGARA TIMUR 533 Phase 2 46 39 054 8.4 122.25962 -8.67987 13012 8204052001 TAWA BACAN BARAT MALUKU UTARA 489 Phase 3 123 126 198 25.4 127.21144 -0.25810 13013 8104030006 WAMLANA MALUKU 1 233 Phase 3 255 261 630 49.5 126.53351 -3.07549 13014 5302020004 PRAING KAREHA NUSA TENGGARA TIMUR 312 Phase 3 72 50 616 10.9 120.04934 -10.00794 13015 5306080011 FULUR NUSA TENGGARA TIMUR 115 Phase 1 32 22 496 4.9 125.14818 -9.09578 13016 5312011007 NARUWOLO I NUSA TENGGARA TIMUR 529 Phase 1 115 97 635 21.1 121.02410 -8.89273 13017 5307011008 KALONDAMA NUSA TENGGARA TIMUR 803 Phase 2 213 180 837 39.0 124.05520 -8.39249 13018 8204052002 MARITOSU MALUKU UTARA 640 Phase 3 165 169 290 34.1 127.24272 -0.24745 13019 8104030006 WAMLANA MALUKU 335 Phase 3 70 71 820 13.6 126.54018 -3.09479 13020 5302020004 PRAING KAREHA NUSA TENGGARA TIMUR 738 Phase 3 194 136 382 29.4 120.04596 -10.01313 13021 5306080011 FULUR NUSA TENGGARA TIMUR 49 Phase 1 14 9 842 2.1 125.14761 -9.09331 13022 5312011007 NARUWOLO I NUSA TENGGARA TIMUR 65 Phase 1 15 12 735 2.7 121.02413 -8.89110 13023 5308050012 LEWOLEBA TIMUR NUSA TENGGARA TIMUR 3 442 Phase 2 322 273 378 59.0 123.46583 -8.36785 13024 8202032003 FRITU MALUKU UTARA 196 Phase 3 49 50 274 10.1 128.13097 0.46014 13025 8104030007 WASPAIT MALUKU 141 Phase 3 18 18 468 3.5 126.54922 -3.09572 13026 5317050012 MAROKOTA NUSA TENGGARA TIMUR 449 Phase 3 59 41 477 8.9 119.18915 -9.48026 13027 5306080011 FULUR NUSA TENGGARA TIMUR 482 Phase 1 131 92 093 19.9 125.14751 -9.08951 13028 5311070023 RATERORU NUSA TENGGARA TIMUR 296 Phase 1 77 65 373 14.1 121.71202 -8.74767 13029 5309012003 BIRAWAN NUSA TENGGARA TIMUR 675 Phase 2 171 145 179 31.3 122.83059 -8.58722 13030 8204020013 LAIWUI MALUKU UTARA 191 Phase 3 44 45 144 9.1 127.52680 -1.25290 13031 8104030007 WASPAIT MALUKU 501 Phase 3 62 63 612 12.0 126.57693 -3.07220 13032 5302034003 WAIRARA NUSA TENGGARA TIMUR 486 Phase 3 96 67 488 14.6 120.52331 -10.06658 13033 5306080011 FULUR NUSA TENGGARA TIMUR 110 Phase 1 30 21 090 4.6 125.15073 -9.09473 13034 5311070023 RATERORU NUSA TENGGARA TIMUR 161 Phase 1 42 35 658 7.7 121.71263 -8.74231 13035 5308030020 DULITUKAN NUSA TENGGARA TIMUR 296 Phase 2 95 80 655 17.4 123.39319 -8.27319 13036 8204023003 GALALA MALUKU UTARA 692 Phase 3 159 163 134 32.9 127.50603 -1.20799 13037 8104030007 WASPAIT MALUKU 295 Phase 3 37 37 962 7.2 126.59456 -3.06884 13038 5302034004 PRAI KALALA NUSA TENGGARA TIMUR 439 Phase 3 88 61 864 13.3 120.50230 -10.03493 13039 5306080012 KEWAR NUSA TENGGARA TIMUR 39 Phase 1 12 8 436 1.8 125.15284 -9.09448 13040 5311070041 TURUNALU NUSA TENGGARA TIMUR 183 Phase 1 54 45 846 9.9 121.70670 -8.74132 13041 5307010042 BANA NUSA TENGGARA TIMUR 99 Phase 2 22 18 678 4.0 124.28461 -8.17598 13042 8204023002 CAP MALUKU UTARA 609 Phase 3 125 128 250 25.8 127.49198 -1.21354 13043 8104030007 WASPAIT MALUKU 550 Phase 3 68 69 768 13.2 126.59816 -3.07189 13044 5302030020 PRAI MBANA NUSA TENGGARA TIMUR 693 Phase 3 191 134 273 29.0 120.46465 -10.01635 13045 5306080012 KEWAR NUSA TENGGARA TIMUR 171 Phase 1 50 35 150 7.6 125.15463 -9.09184 13046 5315030007 MUNTING NUSA TENGGARA TIMUR 44 Phase 1 11 9 339 2.0 120.22059 -8.72099 13047 5307010042 BANA NUSA TENGGARA TIMUR 458 Phase 2 133 112 917 24.4 124.28790 -8.17811 13048 8203022005 SAMA MALUKU UTARA 422 Phase 3 64 65 664 13.2 126.07028 -2.43009 13049 8104030008 WAINIBE MALUKU 840 Phase 3 231 237 006 44.8 126.61100 -3.06964 13050 5302033002 KAMBATA BUNDUNG NUSA TENGGARA TIMUR 1 268 Phase 3 292 205 276 44.3 120.45488 -9.97828 13051 5306080012 KEWAR NUSA TENGGARA TIMUR 21 Phase 1 7 4 921 1.1 125.15562 -9.09150 13052 5315030007 MUNTING NUSA TENGGARA TIMUR 322 Phase 1 74 62 826 13.6 120.21634 -8.72306 13053 5307010040 MUNASELI NUSA TENGGARA TIMUR 718 Phase 2 153 129 897 28.0 124.30433 -8.17743 13054 8203022002 FATKAUYON MALUKU UTARA 269 Phase 3 55 56 430 11.4 126.07077 -2.43137 13055 8106032005 MANUSA MALUKU 510 Phase 3 302 309 852 58.6 128.50731 -3.10886 13056 5302030021 PABERA MANERA NUSA TENGGARA TIMUR 843 Phase 3 167 117 401 25.3 120.50867 -9.99916 13057 5306080012 KEWAR NUSA TENGGARA TIMUR 310 Phase 1 91 63 973 13.8 125.15917 -9.09141 13058 5318040014 WEA AU NUSA TENGGARA TIMUR 638 Phase 1 148 125 652 27.1 121.24099 -8.78696 13059 5309032004 LEWOKLUOK NUSA TENGGARA TIMUR 196 Phase 2 55 46 695 10.1 122.85341 -8.39163 Annex II – Demand forecast results Page 36 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 13060 8204041004 SILANG MALUKU UTARA 610 Phase 3 162 166 212 33.5 127.71526 -0.85129 13061 8109020007 MEPA MALUKU 175 Phase 3 36 36 936 7.0 126.47193 -3.74767 13062 5317080009 TOTOK NUSA TENGGARA TIMUR 148 Phase 3 33 23 199 5.0 119.29605 -9.46439 13063 5306080011 FULUR NUSA TENGGARA TIMUR 55 Phase 1 15 10 545 2.3 125.14814 -9.08689 13064 5313040029 PONGKOR NUSA TENGGARA TIMUR 164 Phase 1 40 33 960 7.3 120.40056 -8.74187 13065 5307012011 BATU NUSA TENGGARA TIMUR 466 Phase 2 122 103 578 22.3 124.29800 -8.26955 13066 8202032004 WALEH MALUKU UTARA 654 Phase 3 128 131 328 26.5 128.18967 0.43107 13067 8109020007 MEPA MALUKU 485 Phase 3 99 101 574 19.2 126.45595 -3.74676 13068 5302030011 KARERA JANGGA NUSA TENGGARA TIMUR 992 Phase 3 227 159 581 34.4 120.38028 -10.08291 13069 5306080011 FULUR NUSA TENGGARA TIMUR 50 Phase 1 14 9 842 2.1 125.14914 -9.08554 13070 5313040029 PONGKOR NUSA TENGGARA TIMUR 96 Phase 1 24 20 376 4.4 120.40099 -8.74387 13071 5309021003 BANTALA NUSA TENGGARA TIMUR 81 Phase 2 20 16 980 3.7 122.90748 -8.27980 13072 8202032008 UPT WALEH MALUKU UTARA 630 Phase 3 157 161 082 32.5 128.21128 0.46526 13073 8109020016 NUSARUA MALUKU 251 Phase 3 55 56 430 10.7 126.41705 -3.71018 13074 5302012006 BIDI PRAING NUSA TENGGARA TIMUR 614 Phase 3 142 99 826 21.5 119.78020 -9.75413 13075 5306080011 FULUR NUSA TENGGARA TIMUR 30 Phase 1 9 6 327 1.4 125.15063 -9.08494 13076 5313040029 PONGKOR NUSA TENGGARA TIMUR 54 Phase 1 14 11 886 2.6 120.39885 -8.75035 13077 5309021004 RIANGKOTEK NUSA TENGGARA TIMUR 918 Phase 2 55 46 695 10.1 122.90656 -8.27929 13078 8202032005 YEKE MALUKU UTARA 581 Phase 3 180 184 680 37.2 128.22194 0.41468 13079 8109020006 TIFU MALUKU 256 Phase 3 66 67 716 12.8 126.40148 -3.71533 13080 5302012003 KANGELI NUSA TENGGARA TIMUR 1 404 Phase 3 288 202 464 43.7 119.78755 -9.70675 13081 5306080011 FULUR NUSA TENGGARA TIMUR 234 Phase 1 64 44 992 9.7 125.15235 -9.08270 13082 5313041009 BEA KONDO NUSA TENGGARA TIMUR 1 182 Phase 1 272 230 928 49.8 120.38882 -8.74887 13083 5309021005 SINAR HADING NUSA TENGGARA TIMUR 626 Phase 2 11 9 339 2.0 122.89567 -8.27309 13084 8204050028 KOTUNANG MALUKU UTARA 347 Phase 3 78 80 028 16.1 127.33722 -0.33891 13085 8109020005 EWIRI MALUKU 1 061 Phase 3 250 256 500 48.5 126.37087 -3.70304 13086 5302052005 UMALULU NUSA TENGGARA TIMUR 681 Phase 3 149 104 747 22.6 120.58984 -9.94701 13087 5306080012 KEWAR NUSA TENGGARA TIMUR 83 Phase 1 25 17 575 3.8 125.15637 -9.08096 13088 5315030007 MUNTING NUSA TENGGARA TIMUR 287 Phase 1 66 56 034 12.1 120.22884 -8.72381 13089 5309021005 SINAR HADING NUSA TENGGARA TIMUR 477 Phase 2 97 82 353 17.8 122.89580 -8.26853 13090 8204050019 KOKOTU MALUKU UTARA 248 Phase 3 76 77 976 15.7 127.35507 -0.33222 13091 8109020004 WAEMALA MALUKU 550 Phase 3 162 166 212 31.4 126.36137 -3.70137 13092 5302052005 UMALULU NUSA TENGGARA TIMUR 358 Phase 3 78 54 834 11.8 120.57912 -9.94589 13093 5306080012 KEWAR NUSA TENGGARA TIMUR 60 Phase 1 18 12 654 2.7 125.15647 -9.07553 13094 5315030007 MUNTING NUSA TENGGARA TIMUR 185 Phase 1 43 36 507 7.9 120.23218 -8.72632 13095 5309021002 ILE PADUNG NUSA TENGGARA TIMUR 287 Phase 2 64 54 336 11.7 122.88199 -8.29179 13096 8204053001 SIDOPO MALUKU UTARA 457 Phase 3 117 120 042 24.2 127.40079 -0.34885 13097 8109010006 NANALI MALUKU 1 007 Phase 3 152 155 952 29.5 126.01738 -3.20738 13098 5302052019 NGARU KANORU NUSA TENGGARA TIMUR 690 Phase 3 130 91 390 19.7 120.58300 -9.97227 13099 5306080012 KEWAR NUSA TENGGARA TIMUR 91 Phase 1 27 18 981 4.1 125.15804 -9.07459 13100 5318030009 KOTAKEO NUSA TENGGARA TIMUR 304 Phase 1 73 61 977 13.4 121.27910 -8.80314 13101 5309021002 ILE PADUNG NUSA TENGGARA TIMUR 201 Phase 2 45 38 205 8.2 122.87979 -8.29029 13102 8204053002 GORUA LOLARO MALUKU UTARA 72 Phase 3 24 24 624 5.0 127.40871 -0.34372 13103 8104021006 UPT WAMSAIT MALUKU 15 Phase 3 5 5 130 1.0 127.04274 -3.40215 13104 5302060007 MAU BOKUL NUSA TENGGARA TIMUR 318 Phase 3 73 51 319 11.1 120.37637 -9.89483 13105 5306080013 MAHUITAS NUSA TENGGARA TIMUR 474 Phase 2 193 135 679 29.3 125.16148 -9.07446 13106 5315031003 REHAK NUSA TENGGARA TIMUR 382 Phase 1 85 72 165 15.6 120.25789 -8.64425 13107 5309021002 ILE PADUNG NUSA TENGGARA TIMUR 434 Phase 2 96 81 504 17.6 122.87325 -8.29480 13108 8204053002 GORUA LOLARO MALUKU UTARA 461 Phase 3 153 156 978 31.6 127.40653 -0.34006 13109 8104021006 UPT WAMSAIT MALUKU 38 Phase 3 11 11 286 2.1 127.04549 -3.40131 13110 5302060007 MAU BOKUL NUSA TENGGARA TIMUR 420 Phase 3 96 67 488 14.6 120.37954 -9.86196 13111 5306080014 MAKIR NUSA TENGGARA TIMUR 1 437 Phase 2 388 272 764 58.9 125.17088 -9.06334 13112 5315030007 MUNTING NUSA TENGGARA TIMUR 822 Phase 1 189 160 461 34.6 120.22934 -8.72837 13113 5308050016 LEWOLEBA SELATAN NUSA TENGGARA TIMUR 2 587 Phase 2 49 41 601 9.0 123.42099 -8.39010 13114 8204021006 TAPA MALUKU UTARA 524 Phase 3 171 175 446 35.3 127.44301 -1.20638 13115 8104021006 UPT WAMSAIT MALUKU 261 Phase 3 73 74 898 14.2 127.04389 -3.38791 13116 5302060007 MAU BOKUL NUSA TENGGARA TIMUR 844 Phase 3 193 135 679 29.3 120.41330 -9.84288 13117 5304071009 PANA NUSA TENGGARA TIMUR 128 Phase 2 38 26 714 5.8 124.49628 -9.98980 13118 5311070041 TURUNALU NUSA TENGGARA TIMUR 173 Phase 1 51 43 299 9.3 121.70190 -8.74013 13119 5308010005 WUAKERONG NUSA TENGGARA TIMUR 404 Phase 2 58 49 242 10.6 123.30163 -8.47348 13120 8204023001 PASIR PUTIH MALUKU UTARA 1 107 Phase 3 550 564 300 113.7 127.43102 -1.16182 13121 8104021006 UPT WAMSAIT MALUKU 353 Phase 3 99 101 574 19.2 127.04515 -3.38578 13122 5302033008 LAI MBONGA NUSA TENGGARA TIMUR 623 Phase 3 142 99 826 21.5 120.44277 -9.86160 13123 5304071009 PANA NUSA TENGGARA TIMUR 96 Phase 2 29 20 387 4.4 124.49511 -9.98930 13124 5313040017 GARA NUSA TENGGARA TIMUR 206 Phase 1 43 36 507 7.9 120.43053 -8.76219 13125 5308050006 WATOKOBU NUSA TENGGARA TIMUR 523 Phase 2 135 114 615 24.7 123.30441 -8.45153 13126 8204090012 BUKIT RAYA MALUKU UTARA 263 Phase 3 74 75 924 15.3 127.87815 -0.04245 13127 8107011020 DARYAR RUMOY MALUKU 509 Phase 3 302 309 852 58.6 131.73151 -4.71768 13128 5302033006 MATAWAI KATINGGA NUSA TENGGARA TIMUR 454 Phase 3 99 69 597 15.0 120.49371 -9.84494 13129 5304071009 PANA NUSA TENGGARA TIMUR 48 Phase 2 15 10 545 2.3 124.49300 -9.99011 13130 5312070020 NABELENA NUSA TENGGARA TIMUR 652 Phase 1 128 108 672 23.4 121.00927 -8.70192 13131 5309012007 DULIPALI NUSA TENGGARA TIMUR 555 Phase 2 74 62 826 13.6 122.78967 -8.48514 13132 8204053003 NUSA BABULLAH MALUKU UTARA 566 Phase 3 166 170 316 34.3 127.43217 -0.35562 13133 8107011001 TEOR MALUKU 2 556 Phase 3 375 384 750 72.8 131.74793 -4.73626 13134 5302033007 KOTAK KAWAU NUSA TENGGARA TIMUR 1 407 Phase 3 365 256 595 55.4 120.51852 -9.78314 13135 5304071009 PANA NUSA TENGGARA TIMUR 474 Phase 2 140 98 420 21.2 124.48477 -9.98586 13136 5312070020 NABELENA NUSA TENGGARA TIMUR 52 Phase 1 11 9 339 2.0 121.00741 -8.69515 13137 5310030006 IPIR NUSA TENGGARA TIMUR 139 Phase 2 38 32 262 7.0 122.31904 -8.73227 13138 8204053004 JOJAME MALUKU UTARA 403 Phase 3 128 131 328 26.5 127.42859 -0.40853 13139 8107011012 KILWOUW MALUKU 675 Phase 3 302 309 852 58.6 131.74016 -4.76844 13140 5302033004 KATAKA NUSA TENGGARA TIMUR 988 Phase 3 232 163 096 35.2 120.52905 -9.87798 13141 5304071009 PANA NUSA TENGGARA TIMUR 555 Phase 2 164 115 292 24.9 124.47846 -9.98851 13142 5312070020 NABELENA NUSA TENGGARA TIMUR 120 Phase 1 24 20 376 4.4 121.00714 -8.69361 13143 5310030006 IPIR NUSA TENGGARA TIMUR 198 Phase 2 53 44 997 9.7 122.32457 -8.74091 13144 8204053005 YABA MALUKU UTARA 825 Phase 3 234 240 084 48.4 127.45736 -0.41642 Annex II – Demand forecast results Page 37 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 13145 8109030003 LEKTAMA MALUKU 508 Phase 3 103 105 678 20.0 126.68918 -3.85929 13146 5302033005 MATAWAI MARINGU NUSA TENGGARA TIMUR 621 Phase 3 121 85 063 18.4 120.54630 -9.85293 13147 5304110010 FATUONI NUSA TENGGARA TIMUR 33 Phase 2 11 7 733 1.7 124.72576 -9.66794 13148 5312070020 NABELENA NUSA TENGGARA TIMUR 46 Phase 1 9 7 641 1.6 121.00549 -8.69254 13149 5310041008 WATUDIRAN NUSA TENGGARA TIMUR 301 Phase 2 81 68 769 14.8 122.55512 -8.66755 13150 8207040004 BERE BERE KECIL MALUKU UTARA 533 Phase 3 120 123 120 24.8 128.44696 2.56663 13151 8103052005 LIANG MALUKU 1 458 Phase 3 323 331 398 62.7 128.78937 -3.14254 13152 5302081005 MONDU NUSA TENGGARA TIMUR 323 Phase 3 81 56 943 12.3 120.11082 -9.50937 13153 5304110010 FATUONI NUSA TENGGARA TIMUR 124 Phase 2 38 26 714 5.8 124.72468 -9.66588 13154 5312070018 INEGENA NUSA TENGGARA TIMUR 612 Phase 1 123 104 427 22.5 121.00265 -8.68941 13155 5307012010 MERDEKA NUSA TENGGARA TIMUR 840 Phase 2 245 208 005 44.9 124.27509 -8.27089 13156 8207040003 TITIGOGOLI MALUKU UTARA 435 Phase 3 89 91 314 18.4 128.42851 2.55404 13157 8103140016 AIR BESAR MALUKU 773 Phase 3 170 174 420 33.0 129.52035 -2.80361 13158 5302051002 LAI LANJANG NUSA TENGGARA TIMUR 40 Phase 3 10 7 030 1.5 120.68874 -10.03806 13159 5304110010 FATUONI NUSA TENGGARA TIMUR 459 Phase 2 140 98 420 21.2 124.71606 -9.66668 13160 5313122003 BANGKA LELAK NUSA TENGGARA TIMUR 326 Phase 1 78 66 222 14.3 120.32861 -8.62946 13161 5308060003 WALANGSAWAH NUSA TENGGARA TIMUR 905 Phase 2 105 89 145 19.2 123.74689 -8.29589 13162 8207040002 HAPO MALUKU UTARA 382 Phase 3 93 95 418 19.2 128.40778 2.52495 13163 8109040003 WAELIKUT MALUKU 654 Phase 3 131 134 406 25.4 127.00562 -3.71481 13164 5302051002 LAI LANJANG NUSA TENGGARA TIMUR 337 Phase 3 80 56 240 12.1 120.69221 -10.03873 13165 5304110010 FATUONI NUSA TENGGARA TIMUR 261 Phase 2 80 56 240 12.1 124.71542 -9.66042 13166 5313122003 BANGKA LELAK NUSA TENGGARA TIMUR 156 Phase 1 38 32 262 7.0 120.33780 -8.62543 13167 5308060004 PEUSAWAH NUSA TENGGARA TIMUR 634 Phase 2 136 115 464 24.9 123.75551 -8.29428 13168 8109040003 WAELIKUT MALUKU 324 Phase 3 65 66 690 12.6 126.99502 -3.72562 13169 5302035002 KAKAHA NUSA TENGGARA TIMUR 56 Phase 3 16 11 248 2.4 120.35844 -10.17470 13170 8207040001 LIBANO MALUKU UTARA 653 Phase 3 219 224 694 45.3 128.35176 2.48700 13171 5304110010 FATUONI NUSA TENGGARA TIMUR 136 Phase 2 42 29 526 6.4 124.72673 -9.66075 13172 5313122003 BANGKA LELAK NUSA TENGGARA TIMUR 425 Phase 1 102 86 598 18.7 120.33849 -8.62381 13173 5307014002 TUDE NUSA TENGGARA TIMUR 496 Phase 2 122 103 578 22.3 124.05544 -8.42397 13174 8103142010 MARASAHUA MALUKU 90 Phase 3 27 27 702 5.2 129.87612 -2.99703 13175 5302035001 PRAI WITU NUSA TENGGARA TIMUR 29 Phase 3 7 4 921 1.1 120.36003 -10.17798 13176 8207030011 CIO GERONG MALUKU UTARA 914 Phase 3 239 245 214 49.4 128.29470 2.42723 13177 5304112006 NITI NUSA TENGGARA TIMUR 142 Phase 2 33 23 199 5.0 124.73238 -9.65430 13178 5315031003 REHAK NUSA TENGGARA TIMUR 138 Phase 1 31 26 319 5.7 120.26197 -8.64044 13179 5307014002 TUDE NUSA TENGGARA TIMUR 653 Phase 2 161 136 689 29.5 124.05364 -8.44944 13180 8103142010 MARASAHUA MALUKU 33 Phase 3 10 10 260 1.9 129.87429 -2.99938 13181 5302035005 PRAU RAMING NUSA TENGGARA TIMUR 331 Phase 3 149 104 747 22.6 120.39824 -10.16113 13182 8207030010 TUTUHU MALUKU UTARA 139 Phase 3 39 40 014 8.1 128.29556 2.40505 13183 5304112006 NITI NUSA TENGGARA TIMUR 181 Phase 2 42 29 526 6.4 124.73009 -9.64842 13184 5315031002 PONG WELAK NUSA TENGGARA TIMUR 195 Phase 1 40 33 960 7.3 120.25548 -8.63063 13185 5307014004 MAUTA NUSA TENGGARA TIMUR 169 Phase 2 45 38 205 8.2 124.05837 -8.47013 13186 8103142010 MARASAHUA MALUKU 236 Phase 3 71 72 846 13.8 129.87165 -3.01429 13187 5316030005 WELUK PRAI MEMANG NUSA TENGGARA TIMUR 714 Phase 3 157 110 371 23.8 119.75538 -9.54069 13188 8207030012 CIO DALAM MALUKU UTARA 23 Phase 3 7 7 182 1.4 128.29838 2.40052 13189 5304112006 NITI NUSA TENGGARA TIMUR 46 Phase 2 11 7 733 1.7 124.72690 -9.64671 13190 5315031002 PONG WELAK NUSA TENGGARA TIMUR 243 Phase 1 49 41 601 9.0 120.25680 -8.62846 13191 5307014004 MAUTA NUSA TENGGARA TIMUR 223 Phase 2 59 50 091 10.8 124.05869 -8.47733 13192 8103140011 MANUSELA MALUKU 2 203 Phase 3 513 526 338 99.5 129.58407 -2.95702 13193 5316020001 UMBU LANGGANG NUSA TENGGARA TIMUR 563 Phase 3 105 73 815 15.9 119.68391 -9.63991 13194 8207030012 CIO DALAM MALUKU UTARA 226 Phase 3 64 65 664 13.2 128.29948 2.39796 13195 5304112006 NITI NUSA TENGGARA TIMUR 259 Phase 2 61 42 883 9.3 124.72683 -9.64471 13196 5315031002 PONG WELAK NUSA TENGGARA TIMUR 264 Phase 1 54 45 846 9.9 120.25194 -8.62317 13197 5307014003 DELAKI NUSA TENGGARA TIMUR 820 Phase 2 212 179 988 38.8 124.05810 -8.47877 13198 8104021006 UPT WAMSAIT MALUKU 147 Phase 3 41 42 066 8.0 127.05112 -3.38752 13199 5316030001 MBILUR PANGADU NUSA TENGGARA TIMUR 1 264 Phase 3 222 156 066 33.7 119.72941 -9.64396 13200 8204081005 JIBUBU MALUKU UTARA 298 Phase 3 75 76 950 15.5 128.20336 -0.76333 13201 5304112006 NITI NUSA TENGGARA TIMUR 375 Phase 2 87 61 161 13.2 124.73208 -9.64730 13202 5315031002 PONG WELAK NUSA TENGGARA TIMUR 278 Phase 1 57 48 393 10.4 120.25896 -8.61675 13203 5309050003 WATANHURA II NUSA TENGGARA TIMUR 259 Phase 2 66 56 034 12.1 123.04294 -8.48450 13204 8109020003 WAEHAKA MALUKU 167 Phase 3 37 37 962 7.2 126.34156 -3.68019 13205 5302010019 BIDI HUNGA NUSA TENGGARA TIMUR 546 Phase 3 128 89 984 19.4 119.86486 -9.62565 13206 8204081004 GANE DALAM MALUKU UTARA 1 099 Phase 3 284 291 384 58.7 128.21984 -0.76839 13207 5303180011 OHAEM II NUSA TENGGARA TIMUR 171 Phase 2 41 28 823 6.2 123.99166 -9.74533 13208 5315031002 PONG WELAK NUSA TENGGARA TIMUR 615 Phase 1 124 105 276 22.7 120.26857 -8.61852 13209 5309050003 WATANHURA II NUSA TENGGARA TIMUR 245 Phase 2 63 53 487 11.5 123.05079 -8.48968 13210 8109020003 WAEHAKA MALUKU 381 Phase 3 84 86 184 16.3 126.31851 -3.67466 13211 5302071008 WANGGA NUSA TENGGARA TIMUR 70 Phase 3 13 9 139 2.0 120.26187 -9.66495 13212 8204081001 DOWORA MALUKU UTARA 345 Phase 3 90 92 340 18.6 128.18156 -0.75655 13213 5303180011 OHAEM II NUSA TENGGARA TIMUR 166 Phase 2 40 28 120 6.1 123.98851 -9.74879 13214 5313040009 TAL NUSA TENGGARA TIMUR 80 Phase 1 18 15 282 3.3 120.39873 -8.75119 13215 5309072009 TOBITIKA NUSA TENGGARA TIMUR 400 Phase 2 78 66 222 14.3 123.29316 -8.27110 13216 8109020015 SLEALALE MALUKU 557 Phase 3 117 120 042 22.7 126.32575 -3.65985 13217 5302071008 WANGGA NUSA TENGGARA TIMUR 137 Phase 3 25 17 575 3.8 120.26274 -9.66689 13218 8201140004 SOA-SIO MALUKU UTARA 103 Phase 3 28 28 728 5.8 127.58653 1.69517 13219 5303180011 OHAEM II NUSA TENGGARA TIMUR 197 Phase 2 48 33 744 7.3 123.98635 -9.75256 13220 5313130001 BERE NUSA TENGGARA TIMUR 154 Phase 1 36 30 564 6.6 120.43255 -8.51725 13221 5309072009 TOBITIKA NUSA TENGGARA TIMUR 100 Phase 2 36 30 564 6.6 123.29274 -8.26928 13222 8109020002 WAETUREN MALUKU 620 Phase 3 167 171 342 32.4 126.29511 -3.66670 13223 5317040006 BONDO UKKA NUSA TENGGARA TIMUR 205 Phase 3 29 20 387 4.4 119.17733 -9.57582 13224 8204081006 AWIS MALUKU UTARA 372 Phase 3 89 91 314 18.4 128.15409 -0.74730 13225 5303180011 OHAEM II NUSA TENGGARA TIMUR 290 Phase 2 70 49 210 10.6 123.98350 -9.75528 13226 5313040009 TAL NUSA TENGGARA TIMUR 143 Phase 1 32 27 168 5.9 120.39923 -8.75553 13227 5309072004 PLEDO NUSA TENGGARA TIMUR 545 Phase 2 149 126 501 27.3 123.31336 -8.25628 13228 8104021009 KAYELI MALUKU 256 Phase 3 58 59 508 11.3 127.10416 -3.39846 13229 5316030003 PADIRA TANA NUSA TENGGARA TIMUR 900 Phase 3 165 115 995 25.0 119.82149 -9.65223 Annex II – Demand forecast results Page 38 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 13230 8204081007 PASI PALELE MALUKU UTARA 944 Phase 3 228 233 928 47.1 128.13277 -0.73768 13231 5304112002 SABNALA NUSA TENGGARA TIMUR 314 Phase 2 84 59 052 12.7 124.73713 -9.64317 13232 5313040009 TAL NUSA TENGGARA TIMUR 183 Phase 1 41 34 809 7.5 120.39934 -8.76147 13233 5309012003 BIRAWAN NUSA TENGGARA TIMUR 744 Phase 2 188 159 612 34.4 122.83626 -8.57603 13234 8104021009 KAYELI MALUKU 208 Phase 3 47 48 222 9.1 127.10668 -3.40539 13235 5316030002 PRAI KAROKU JANGGA NUSA TENGGARA TIMUR 772 Phase 3 152 106 856 23.1 119.79418 -9.61629 13236 8203041005 MINALULI MALUKU UTARA 464 Phase 3 109 111 834 22.5 125.52601 -1.80653 13237 5304080007 PISAN NUSA TENGGARA TIMUR 721 Phase 2 202 142 006 30.6 124.60324 -9.72869 13238 5313040009 TAL NUSA TENGGARA TIMUR 81 Phase 1 18 15 282 3.3 120.39720 -8.76456 13239 5307012008 MAWAR NUSA TENGGARA TIMUR 185 Phase 2 44 37 356 8.1 124.30778 -8.30586 13240 8104021009 KAYELI MALUKU 128 Phase 3 29 29 754 5.6 127.10502 -3.39440 13241 5301021006 PATIALA BAWA NUSA TENGGARA TIMUR 139 Phase 3 37 26 011 5.6 119.31500 -9.76144 13242 8203060016 TALLO MALUKU UTARA 382 Phase 3 85 87 210 17.6 124.39843 -2.00238 13243 5304112002 SABNALA NUSA TENGGARA TIMUR 436 Phase 2 116 81 548 17.6 124.73885 -9.63746 13244 5313040009 TAL NUSA TENGGARA TIMUR 63 Phase 1 14 11 886 2.6 120.39850 -8.77454 13245 5310042014 TANARAWA NUSA TENGGARA TIMUR 162 Phase 2 43 36 507 7.9 122.58291 -8.58347 13246 8104021009 KAYELI MALUKU 160 Phase 3 37 37 962 7.2 127.11059 -3.38359 13247 5302010009 KONDAMARA NUSA TENGGARA TIMUR 378 Phase 3 74 52 022 11.2 119.92907 -9.65894 13248 8203060016 TALLO MALUKU UTARA 180 Phase 3 40 41 040 8.3 124.39746 -2.02882 13249 5304060008 KAKAN NUSA TENGGARA TIMUR 1 058 Phase 2 243 170 829 36.9 124.47336 -9.99332 13250 5313041010 GOLO ROPONG NUSA TENGGARA TIMUR 380 Phase 1 95 80 655 17.4 120.38977 -8.77534 13251 5310042025 TUA BAO NUSA TENGGARA TIMUR 203 Phase 2 48 40 752 8.8 122.55941 -8.59068 13252 8104021008 MASARETE MALUKU 298 Phase 3 92 94 392 17.9 127.12024 -3.38445 13253 5302010018 MATAWAI PAWALI NUSA TENGGARA TIMUR 857 Phase 3 172 120 916 26.1 119.94957 -9.62530 13254 8203060023 PANCORAN MALUKU UTARA 676 Phase 3 188 192 888 38.9 124.40450 -2.04431 13255 5304101013 BAUS NUSA TENGGARA TIMUR 116 Phase 2 35 24 605 5.3 124.78608 -9.79025 13256 5313041008 HILIHINTIR NUSA TENGGARA TIMUR 65 Phase 1 14 11 886 2.6 120.38648 -8.78094 13257 5310042011 NATARMAGE NUSA TENGGARA TIMUR 538 Phase 2 130 110 370 23.8 122.56653 -8.60319 13258 8104021007 WAELAPIA MALUKU 743 Phase 3 173 177 498 33.6 127.14848 -3.34679 13259 5302012001 WATUMBELAR NUSA TENGGARA TIMUR 670 Phase 3 183 128 649 27.8 119.76507 -9.77473 13260 8203042002 BUYA MALUKU UTARA 1 326 Phase 3 274 281 124 56.6 125.58245 -1.92875 13261 5304101012 MEUSIN NUSA TENGGARA TIMUR 751 Phase 2 139 97 717 21.1 124.78199 -9.79920 13262 5313041008 HILIHINTIR NUSA TENGGARA TIMUR 678 Phase 1 137 116 313 25.1 120.38130 -8.77562 13263 5310042011 NATARMAGE NUSA TENGGARA TIMUR 68 Phase 2 17 14 433 3.1 122.56750 -8.60593 13264 8104023005 SEITH MALUKU 793 Phase 3 211 216 486 40.9 127.18339 -3.35715 13265 5301050007 TANA RARA NUSA TENGGARA TIMUR 147 Phase 3 30 21 090 4.6 119.47529 -9.52833 13266 8204063002 GAYAP MALUKU UTARA 429 Phase 3 109 111 834 22.5 127.45836 0.05499 13267 5320060002 LOBODEI NUSA TENGGARA TIMUR 878 Phase 2 223 156 769 33.8 121.96479 -10.52720 13268 5313041008 HILIHINTIR NUSA TENGGARA TIMUR 219 Phase 1 44 37 356 8.1 120.37711 -8.77265 13269 5310042011 NATARMAGE NUSA TENGGARA TIMUR 93 Phase 2 23 19 527 4.2 122.56814 -8.60696 13270 8103050023 SEPA MALUKU 227 Phase 3 43 44 118 8.3 129.01864 -3.27584 13271 5317040006 BONDO UKKA NUSA TENGGARA TIMUR 193 Phase 3 28 19 684 4.2 119.16836 -9.56118 13272 8204063001 AKE JAILOLO MALUKU UTARA 302 Phase 3 68 69 768 14.1 127.46548 -0.00725 13273 5304080007 PISAN NUSA TENGGARA TIMUR 39 Phase 2 11 7 733 1.7 124.59502 -9.73388 13274 5313041008 HILIHINTIR NUSA TENGGARA TIMUR 108 Phase 1 22 18 678 4.0 120.37549 -8.77175 13275 5308050013 LITEULUMADO NUSA TENGGARA TIMUR 193 Phase 2 53 44 997 9.7 123.46581 -8.39229 13276 8103050014 HARURU MALUKU 237 Phase 3 50 51 300 9.7 129.01741 -3.27587 13277 5302040010 KURUWAKI NUSA TENGGARA TIMUR 692 Phase 3 198 139 194 30.0 120.57423 -10.13967 13278 8205021016 TOBOULAMO MALUKU UTARA 338 Phase 3 61 62 586 12.6 127.86001 1.41255 13279 5304080007 PISAN NUSA TENGGARA TIMUR 244 Phase 2 69 48 507 10.5 124.60075 -9.74344 13280 5313041008 HILIHINTIR NUSA TENGGARA TIMUR 60 Phase 1 13 11 037 2.4 120.37473 -8.77152 13281 5308050003 BAOLANGU NUSA TENGGARA TIMUR 67 Phase 2 20 16 980 3.7 123.47349 -8.41506 13282 8109010005 BILORO MALUKU 431 Phase 3 101 103 626 19.6 126.01711 -3.18074 13283 5316030004 SORU NUSA TENGGARA TIMUR 728 Phase 3 186 130 758 28.2 119.81413 -9.54918 13284 8206041001 BERINGIN LAMO MALUKU UTARA 287 Phase 3 72 73 872 14.9 128.47133 0.97719 13285 5304080007 PISAN NUSA TENGGARA TIMUR 191 Phase 2 54 37 962 8.2 124.59581 -9.74670 13286 5313041008 HILIHINTIR NUSA TENGGARA TIMUR 1 191 Phase 1 240 203 760 44.0 120.37219 -8.77230 13287 5308050003 BAOLANGU NUSA TENGGARA TIMUR 49 Phase 2 14 11 886 2.6 123.47282 -8.41851 13288 8107022009 KAMAR MALUKU 470 Phase 3 172 176 472 33.4 130.63496 -3.79279 13289 5302020004 PRAING KAREHA NUSA TENGGARA TIMUR 167 Phase 3 44 30 932 6.7 120.04187 -10.01688 13290 8206041001 BERINGIN LAMO MALUKU UTARA 391 Phase 3 98 100 548 20.3 128.47423 0.97552 13291 5304080007 PISAN NUSA TENGGARA TIMUR 126 Phase 2 36 25 308 5.5 124.59142 -9.74899 13292 5313040029 PONGKOR NUSA TENGGARA TIMUR 320 Phase 1 78 66 222 14.3 120.38750 -8.71356 13293 5308050003 BAOLANGU NUSA TENGGARA TIMUR 16 Phase 2 5 4 245 0.9 123.47371 -8.41909 13294 8106020015 KAIBOBU MALUKU 158 Phase 3 32 32 832 6.2 128.17428 -3.14497 13295 5302033003 KAMANGGIH NUSA TENGGARA TIMUR 1 399 Phase 3 163 114 589 24.7 120.48651 -9.91015 13296 8206041001 BERINGIN LAMO MALUKU UTARA 163 Phase 3 41 42 066 8.5 128.47640 0.97982 13297 5304080007 PISAN NUSA TENGGARA TIMUR 137 Phase 2 39 27 417 5.9 124.59300 -9.75074 13298 5319010018 TOROK GOLO NUSA TENGGARA TIMUR 202 Phase 1 44 37 356 8.1 120.55511 -8.72837 13299 5308020016 KATAKEJA NUSA TENGGARA TIMUR 644 Phase 2 168 142 632 30.8 123.46847 -8.43411 13300 8106020015 KAIBOBU MALUKU 1 560 Phase 3 314 322 164 60.9 128.17698 -3.21507 13301 5302013003 KOMBAPARI NUSA TENGGARA TIMUR 761 Phase 3 138 97 014 20.9 119.95076 -9.79870 13302 8206041002 BEBSILI MALUKU UTARA 228 Phase 3 65 66 690 13.4 128.50696 0.97363 13303 5304080004 MAULEUM NUSA TENGGARA TIMUR 680 Phase 2 198 139 194 30.0 124.58266 -9.74411 13304 5318060017 WAEKOKAK NUSA TENGGARA TIMUR 1 232 Phase 1 259 219 891 47.4 121.25092 -8.49526 13305 5308020016 KATAKEJA NUSA TENGGARA TIMUR 68 Phase 2 18 15 282 3.3 123.46977 -8.44648 13306 8109010005 BILORO MALUKU 214 Phase 3 50 51 300 9.7 126.01864 -3.17705 13307 5302013002 LAI LARA NUSA TENGGARA TIMUR 991 Phase 3 235 165 205 35.6 119.93814 -9.84350 13308 8206041004 WAYAMLI MALUKU UTARA 1 555 Phase 3 240 246 240 49.6 128.51748 0.97203 13309 5304080004 MAULEUM NUSA TENGGARA TIMUR 107 Phase 2 32 22 496 4.9 124.57716 -9.75257 13310 5311051001 NUAMULI NUSA TENGGARA TIMUR 119 Phase 1 29 24 621 5.3 121.83499 -8.85168 13311 5308020016 KATAKEJA NUSA TENGGARA TIMUR 124 Phase 2 33 28 017 6.0 123.47121 -8.44700 13312 8107030017 TOBO MALUKU 171 Phase 3 60 61 560 11.6 130.25774 -3.57450 13313 5302020015 KUKI TALU NUSA TENGGARA TIMUR 558 Phase 3 150 105 450 22.8 120.11416 -9.90702 13314 8204021004 SOA SANGAJI MALUKU UTARA 383 Phase 3 73 74 898 15.1 127.37248 -1.38454 Annex II – Demand forecast results Page 39 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 13315 5304080004 MAULEUM NUSA TENGGARA TIMUR 238 Phase 2 70 49 210 10.6 124.57319 -9.76110 13316 5311051001 NUAMULI NUSA TENGGARA TIMUR 62 Phase 1 15 12 735 2.7 121.83393 -8.85344 13317 5308020013 DORI PEWUT NUSA TENGGARA TIMUR 89 Phase 2 27 22 923 4.9 123.47115 -8.46602 13318 8107030010 BATUASA MALUKU 186 Phase 3 37 37 962 7.2 130.25944 -3.57471 13319 5302011005 PULU PANJANG NUSA TENGGARA TIMUR 1 104 Phase 3 225 158 175 34.1 120.06209 -9.76626 13320 8204021002 JIKOHAY MALUKU UTARA 1 117 Phase 3 250 256 500 51.7 127.33769 -1.38944 13321 5304081004 NUNUHAKNITI NUSA TENGGARA TIMUR 650 Phase 2 180 126 540 27.3 124.57367 -9.77087 13322 5311040009 NGALUROGA NUSA TENGGARA TIMUR 355 Phase 1 96 81 504 17.6 121.83166 -8.85518 13323 5308020013 DORI PEWUT NUSA TENGGARA TIMUR 96 Phase 2 29 24 621 5.3 123.47107 -8.48050 13324 8107020030 KIANDARAT MALUKU 124 Phase 3 15 15 390 2.9 130.81098 -3.63481 13325 5302020014 PINDU HURANI NUSA TENGGARA TIMUR 467 Phase 3 105 73 815 15.9 120.00846 -10.02235 13326 8204021001 MANATAHAN MALUKU UTARA 1 046 Phase 3 217 222 642 44.9 127.31854 -1.39519 13327 5304081004 NUNUHAKNITI NUSA TENGGARA TIMUR 102 Phase 2 29 20 387 4.4 124.57890 -9.77393 13328 5311051001 NUAMULI NUSA TENGGARA TIMUR 85 Phase 1 21 17 829 3.8 121.83218 -8.85065 13329 5308020018 NOGO DONI NUSA TENGGARA TIMUR 10 Phase 2 4 3 396 0.7 123.47006 -8.48107 13330 8107020030 KIANDARAT MALUKU 785 Phase 3 95 97 470 18.4 130.81560 -3.63198 13331 5302013001 PRAI BAKUL NUSA TENGGARA TIMUR 966 Phase 3 233 163 799 35.3 119.86741 -9.88176 13332 8204021005 ALAM PELITA MALUKU UTARA 352 Phase 3 71 72 846 14.7 127.38413 -1.38996 13333 5304081003 KAENENO NUSA TENGGARA TIMUR 98 Phase 2 28 19 684 4.2 124.58854 -9.78135 13334 5311040009 NGALUROGA NUSA TENGGARA TIMUR 160 Phase 1 43 36 507 7.9 121.81943 -8.84807 13335 5308011009 ATAKERA NUSA TENGGARA TIMUR 622 Phase 2 182 154 518 33.3 123.47117 -8.50290 13336 8104021008 MASARETE MALUKU 203 Phase 3 63 64 638 12.2 127.12971 -3.40056 13337 5302020001 TARIMBANG NUSA TENGGARA TIMUR 1 230 Phase 3 232 163 096 35.2 119.95340 -9.96198 13338 8204020021 KAWASI MALUKU UTARA 770 Phase 3 162 166 212 33.5 127.41151 -1.54776 13339 5304081003 KAENENO NUSA TENGGARA TIMUR 375 Phase 2 105 73 815 15.9 124.59328 -9.77769 13340 5311040008 NILA NUSA TENGGARA TIMUR 78 Phase 1 22 18 678 4.0 121.80696 -8.85363 13341 5308011015 ATAILI NUSA TENGGARA TIMUR 103 Phase 2 31 26 319 5.7 123.46926 -8.51399 13342 8107030018 OSONG MALUKU 180 Phase 3 302 309 852 58.6 130.30366 -3.58688 13343 5302034001 PATAMAWAI NUSA TENGGARA TIMUR 610 Phase 3 119 83 657 18.1 120.47340 -10.06562 13344 8204010003 SOLIGI MALUKU UTARA 2 070 Phase 3 376 385 776 77.7 127.42277 -1.65760 13345 5304081003 KAENENO NUSA TENGGARA TIMUR 107 Phase 2 30 21 090 4.6 124.59301 -9.77243 13346 5311040008 NILA NUSA TENGGARA TIMUR 101 Phase 1 29 24 621 5.3 121.80768 -8.85682 13347 5308011015 ATAILI NUSA TENGGARA TIMUR 51 Phase 2 15 12 735 2.7 123.47092 -8.51899 13348 8109030002 WAENALUT MALUKU 245 Phase 3 55 56 430 10.7 126.66855 -3.84198 13349 5302040013 TANAMANANG NUSA TENGGARA TIMUR 36 Phase 3 10 7 030 1.5 120.73657 -10.12851 13350 8204010004 WAYALOAR MALUKU UTARA 3 002 Phase 3 608 623 808 125.7 127.60744 -1.72541 13351 5304081003 KAENENO NUSA TENGGARA TIMUR 65 Phase 2 19 13 357 2.9 124.59226 -9.76981 13352 5311040008 NILA NUSA TENGGARA TIMUR 156 Phase 1 44 37 356 8.1 121.81070 -8.86229 13353 5308011010 LEWORAJA NUSA TENGGARA TIMUR 161 Phase 2 51 43 299 9.3 123.48246 -8.51695 13354 8109030001 WAMKANA MALUKU 754 Phase 3 175 179 550 34.0 126.63209 -3.81935 13355 5302040013 TANAMANANG NUSA TENGGARA TIMUR 148 Phase 3 39 27 417 5.9 120.74227 -10.13379 13356 8204010002 MANO MALUKU UTARA 2 355 Phase 3 418 428 868 86.4 127.62457 -1.83513 13357 5304081003 KAENENO NUSA TENGGARA TIMUR 76 Phase 2 22 15 466 3.3 124.59462 -9.76787 13358 5311040008 NILA NUSA TENGGARA TIMUR 124 Phase 1 35 29 715 6.4 121.81190 -8.86546 13359 5308011010 LEWORAJA NUSA TENGGARA TIMUR 526 Phase 2 165 140 085 30.2 123.48450 -8.51558 13360 8109030001 WAMKANA MALUKU 134 Phase 3 31 31 806 6.0 126.62372 -3.82090 13361 5302061003 MARADA MUNDI NUSA TENGGARA TIMUR 127 Phase 3 34 23 902 5.2 120.25225 -9.76923 13362 8204010001 LOLEO MALUKU UTARA 589 Phase 3 129 132 354 26.7 127.58841 -1.84351 13363 5304081003 KAENENO NUSA TENGGARA TIMUR 1 180 Phase 2 328 230 584 49.8 124.60084 -9.76679 13364 5311040008 NILA NUSA TENGGARA TIMUR 276 Phase 1 78 66 222 14.3 121.80733 -8.86802 13365 5308020013 DORI PEWUT NUSA TENGGARA TIMUR 239 Phase 2 72 61 128 13.2 123.48991 -8.48036 13366 8103010002 PULAU AI MALUKU 1 327 Phase 3 342 350 892 66.4 129.77404 -4.52672 13367 5302061003 MARADA MUNDI NUSA TENGGARA TIMUR 41 Phase 3 11 7 733 1.7 120.25123 -9.77377 13368 8206041010 MARASIPNO MALUKU UTARA 314 Phase 3 55 56 430 11.4 128.54788 0.99190 13369 5304081003 KAENENO NUSA TENGGARA TIMUR 668 Phase 2 186 130 758 28.2 124.61085 -9.76617 13370 5311040008 NILA NUSA TENGGARA TIMUR 174 Phase 1 49 41 601 9.0 121.80011 -8.86816 13371 5308020011 LEBAATA NUSA TENGGARA TIMUR 92 Phase 2 31 26 319 5.7 123.49907 -8.48917 13372 8103010001 PULAU RHUN MALUKU 1 248 Phase 3 318 326 268 61.7 129.68284 -4.55583 13373 5302061003 MARADA MUNDI NUSA TENGGARA TIMUR 253 Phase 3 67 47 101 10.2 120.26420 -9.77851 13374 8206041010 MARASIPNO MALUKU UTARA 183 Phase 3 32 32 832 6.6 128.55785 0.99962 13375 5304081004 NUNUHAKNITI NUSA TENGGARA TIMUR 53 Phase 2 15 10 545 2.3 124.57224 -9.77900 13376 5311040008 NILA NUSA TENGGARA TIMUR 79 Phase 1 23 19 527 4.2 121.78934 -8.87447 13377 5308020011 LEBAATA NUSA TENGGARA TIMUR 75 Phase 2 26 22 074 4.8 123.50052 -8.48897 13378 8107011007 LAHEMA MALUKU 678 Phase 3 125 128 250 24.3 131.60681 -4.41130 13379 5302061003 MARADA MUNDI NUSA TENGGARA TIMUR 189 Phase 3 50 35 150 7.6 120.26679 -9.77349 13380 8206041010 MARASIPNO MALUKU UTARA 58 Phase 3 11 11 286 2.3 128.55828 1.00016 13381 5304081004 NUNUHAKNITI NUSA TENGGARA TIMUR 175 Phase 2 49 34 447 7.4 124.57397 -9.78290 13382 5311040007 KEKASEWA NUSA TENGGARA TIMUR 459 Phase 1 162 137 538 29.7 121.78487 -8.87342 13383 5308020010 NUBAHAERAKA NUSA TENGGARA TIMUR 61 Phase 2 21 17 829 3.8 123.51706 -8.49088 13384 8109020002 WAETUREN MALUKU 123 Phase 3 34 34 884 6.6 126.26643 -3.63971 13385 5302061003 MARADA MUNDI NUSA TENGGARA TIMUR 101 Phase 3 27 18 981 4.1 120.26815 -9.77155 13386 8206041006 MIAF MALUKU UTARA 169 Phase 3 37 37 962 7.6 128.60984 1.04253 13387 5304081004 NUNUHAKNITI NUSA TENGGARA TIMUR 30 Phase 2 9 6 327 1.4 124.57426 -9.78739 13388 5311040018 WOLOKOTA NUSA TENGGARA TIMUR 302 Phase 1 89 75 561 16.3 121.76847 -8.87355 13389 5308020010 NUBAHAERAKA NUSA TENGGARA TIMUR 52 Phase 2 18 15 282 3.3 123.52910 -8.48589 13390 8109020001 WAEMULANG MALUKU 154 Phase 3 43 44 118 8.3 126.25855 -3.63538 13391 5302061005 LAI META NUSA TENGGARA TIMUR 537 Phase 3 126 88 578 19.1 120.27919 -9.93142 13392 8206041006 MIAF MALUKU UTARA 638 Phase 3 139 142 614 28.7 128.62391 1.04746 13393 5304081001 SILLU NUSA TENGGARA TIMUR 120 Phase 2 33 23 199 5.0 124.56570 -9.78568 13394 5311040017 REKA NUSA TENGGARA TIMUR 576 Phase 1 119 101 031 21.8 121.75360 -8.87286 13395 5308020017 NUBA ATALOJO NUSA TENGGARA TIMUR 316 Phase 2 115 97 635 21.1 123.52480 -8.46900 13396 8109020001 WAEMULANG MALUKU 248 Phase 3 69 70 794 13.4 126.25315 -3.62827 13397 5302080008 PRAI BAKUL NUSA TENGGARA TIMUR 699 Phase 3 142 99 826 21.5 120.03530 -9.49305 13398 8206041008 DOROLAMO JAYA MALUKU UTARA 115 Phase 3 31 31 806 6.4 128.62011 1.07061 13399 5304081001 SILLU NUSA TENGGARA TIMUR 126 Phase 2 35 24 605 5.3 124.55790 -9.78319 Annex II – Demand forecast results Page 40 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 13400 5311040006 NGALUPOLO NUSA TENGGARA TIMUR 960 Phase 1 243 206 307 44.5 121.73513 -8.87177 13401 5308020014 ILE KIMOK NUSA TENGGARA TIMUR 1 485 Phase 2 367 311 583 67.2 123.54345 -8.44410 13402 8109020001 WAEMULANG MALUKU 1 227 Phase 3 338 346 788 65.6 126.18133 -3.60855 13403 5302071003 LAMBANAPU NUSA TENGGARA TIMUR 136 Phase 3 24 16 872 3.6 120.28983 -9.70249 13404 8206042001 SOSOLAT MALUKU UTARA 290 Phase 3 75 76 950 15.5 128.69395 1.07661 13405 5304081001 SILLU NUSA TENGGARA TIMUR 33 Phase 2 10 7 030 1.5 124.55121 -9.77926 13406 5315030015 DALENG NUSA TENGGARA TIMUR 248 Phase 1 67 56 883 12.3 120.20550 -8.68034 13407 5308020015 TUBUK RAJAN NUSA TENGGARA TIMUR 551 Phase 2 157 133 293 28.8 123.50975 -8.44862 13408 8109010005 BILORO MALUKU 41 Phase 3 10 10 260 1.9 126.01952 -3.17508 13409 5317080011 LETE KONDA NUSA TENGGARA TIMUR 257 Phase 3 46 32 338 7.0 119.33437 -9.43456 13410 8206042001 SOSOLAT MALUKU UTARA 497 Phase 3 128 131 328 26.5 128.69083 1.10886 13411 5304081001 SILLU NUSA TENGGARA TIMUR 312 Phase 2 86 60 458 13.0 124.54759 -9.78388 13412 5315030020 WAE KANTA NUSA TENGGARA TIMUR 667 Phase 1 145 123 105 26.6 120.21165 -8.67360 13413 5308020010 NUBAHAERAKA NUSA TENGGARA TIMUR 17 Phase 2 6 5 094 1.1 123.53395 -8.49055 13414 8109010007 WAEKEKA MALUKU 582 Phase 3 143 146 718 27.7 126.05852 -3.14692 13415 5302061001 WAIMBIDI NUSA TENGGARA TIMUR 438 Phase 3 116 81 548 17.6 120.29093 -9.81986 13416 8206042002 LOLASITA MALUKU UTARA 401 Phase 3 90 92 340 18.6 128.70227 1.23517 13417 5304081001 SILLU NUSA TENGGARA TIMUR 231 Phase 2 64 44 992 9.7 124.53650 -9.78526 13418 5311061010 NDONDO NUSA TENGGARA TIMUR 378 Phase 1 91 77 259 16.7 121.93737 -8.50686 13419 5308020010 NUBAHAERAKA NUSA TENGGARA TIMUR 2 Phase 2 1 849 0.2 123.53944 -8.49470 13420 8109010008 BALPETU MALUKU 378 Phase 3 84 86 184 16.3 126.07713 -3.13161 13421 5302061002 LUKU WINGIR NUSA TENGGARA TIMUR 278 Phase 3 65 45 695 9.9 120.24502 -9.83201 13422 8206042002 LOLASITA MALUKU UTARA 451 Phase 3 101 103 626 20.9 128.70634 1.26630 13423 5304081001 SILLU NUSA TENGGARA TIMUR 10 Phase 2 3 2 109 0.5 124.53088 -9.79595 13424 5318010018 KELIWATULEWA NUSA TENGGARA TIMUR 147 Phase 1 36 30 564 6.6 121.22386 -8.88271 13425 5308020009 ATAKORE NUSA TENGGARA TIMUR 239 Phase 2 83 70 467 15.2 123.53989 -8.49502 13426 8109010008 BALPETU MALUKU 406 Phase 3 91 93 366 17.7 126.12288 -3.15075 13427 5302061006 MAHU BOKUL NUSA TENGGARA TIMUR 416 Phase 3 97 68 191 14.7 120.24636 -9.84481 13428 8206042003 DOROSAGO MALUKU UTARA 1 553 Phase 3 420 430 920 86.8 128.74386 1.33761 13429 5304081001 SILLU NUSA TENGGARA TIMUR 37 Phase 2 11 7 733 1.7 124.53032 -9.79637 13430 5318010018 KELIWATULEWA NUSA TENGGARA TIMUR 187 Phase 1 45 38 205 8.2 121.22574 -8.88690 13431 5308020004 LUSILAME NUSA TENGGARA TIMUR 130 Phase 2 50 42 450 9.2 123.54234 -8.50731 13432 8104030001 BARA MALUKU 26 Phase 3 6 6 156 1.2 126.12533 -3.15287 13433 5302080009 MBATAPUHU NUSA TENGGARA TIMUR 951 Phase 3 183 128 649 27.8 119.96623 -9.52494 13434 8206042004 WASILEO MALUKU UTARA 233 Phase 3 48 49 248 9.9 128.74956 1.38157 13435 5304081001 SILLU NUSA TENGGARA TIMUR 7 Phase 2 2 1 406 0.3 124.52653 -9.79318 13436 5318010017 UA NUSA TENGGARA TIMUR 66 Phase 1 16 13 584 2.9 121.22184 -8.87523 13437 5308020009 ATAKORE NUSA TENGGARA TIMUR 418 Phase 2 144 122 256 26.4 123.55375 -8.50247 13438 8104030001 BARA MALUKU 582 Phase 3 127 130 302 24.6 126.13784 -3.16415 13439 5302040017 PALANGGAI NUSA TENGGARA TIMUR 666 Phase 3 123 86 469 18.7 120.83853 -10.08162 13440 8206042004 WASILEO MALUKU UTARA 670 Phase 3 136 139 536 28.1 128.75115 1.38196 13441 5304081001 SILLU NUSA TENGGARA TIMUR 90 Phase 2 25 17 575 3.8 124.52627 -9.79214 13442 5318010017 UA NUSA TENGGARA TIMUR 125 Phase 1 31 26 319 5.7 121.22225 -8.87471 13443 5308020010 NUBAHAERAKA NUSA TENGGARA TIMUR 182 Phase 2 61 51 789 11.2 123.52288 -8.49896 13444 8109050005 MASAWOY MALUKU 750 Phase 3 120 123 120 23.3 127.26145 -3.92571 13445 5302012002 UMAMANU NUSA TENGGARA TIMUR 865 Phase 3 149 104 747 22.6 119.77947 -9.84501 13446 8206042006 PUMLANGA MALUKU UTARA 679 Phase 3 156 160 056 32.2 128.68427 1.47341 13447 5304081001 SILLU NUSA TENGGARA TIMUR 229 Phase 2 63 44 289 9.6 124.52323 -9.79741 13448 5318010017 UA NUSA TENGGARA TIMUR 69 Phase 1 17 14 433 3.1 121.22083 -8.86592 13449 5310030002 WOLONWALU NUSA TENGGARA TIMUR 86 Phase 2 25 21 225 4.6 122.26720 -8.74149 13450 8109050001 SIWAR MALUKU 890 Phase 3 134 137 484 26.0 127.26097 -3.97576 13451 5302012005 MONDU LAMBI NUSA TENGGARA TIMUR 642 Phase 3 103 72 409 15.6 119.77545 -9.87987 13452 8206042005 PATLIAN MALUKU UTARA 1 011 Phase 3 183 187 758 37.8 128.69542 1.51186 13453 5304081001 SILLU NUSA TENGGARA TIMUR 370 Phase 2 102 71 706 15.5 124.51813 -9.79502 13454 5318010017 UA NUSA TENGGARA TIMUR 76 Phase 1 19 16 131 3.5 121.22170 -8.86579 13455 5310030001 HOKOR NUSA TENGGARA TIMUR 202 Phase 2 55 46 695 10.1 122.26209 -8.74470 13456 8109050002 SELASI MALUKU 606 Phase 3 101 103 626 19.6 127.30733 -3.96242 13457 5302013004 MANDAHU NUSA TENGGARA TIMUR 615 Phase 3 120 84 360 18.2 119.99913 -9.81988 13458 8206042007 JARA JARA MALUKU UTARA 1 285 Phase 3 257 263 682 53.1 128.72245 1.57147 13459 5304081001 SILLU NUSA TENGGARA TIMUR 31 Phase 2 9 6 327 1.4 124.51522 -9.79427 13460 5318010017 UA NUSA TENGGARA TIMUR 222 Phase 1 54 45 846 9.9 121.22448 -8.86520 13461 5309032006 BAMA NUSA TENGGARA TIMUR 221 Phase 2 60 50 940 11.0 122.86005 -8.38183 13462 8109050004 LUMOY MALUKU 1 209 Phase 3 208 213 408 40.4 127.31572 -3.91191 13463 5302060015 LAINDEHA NUSA TENGGARA TIMUR 470 Phase 3 93 65 379 14.1 120.33194 -9.83052 13464 8206042008 UPT PATLIAN SP I MALUKU UTARA 419 Phase 3 128 131 328 26.5 128.65502 1.48744 13465 5304081001 SILLU NUSA TENGGARA TIMUR 12 Phase 2 4 2 812 0.6 124.51482 -9.79368 13466 5318010017 UA NUSA TENGGARA TIMUR 289 Phase 1 70 59 430 12.8 121.22606 -8.85718 13467 5309032005 BLEPANAWA NUSA TENGGARA TIMUR 423 Phase 2 111 94 239 20.3 122.86162 -8.36285 13468 8109050003 ELARA MALUKU 1 452 Phase 3 224 229 824 43.5 127.35370 -3.93752 13469 5302030026 LAI TAKU NUSA TENGGARA TIMUR 406 Phase 3 104 73 112 15.8 120.41953 -10.05599 13470 8206041008 DOROLAMO JAYA MALUKU UTARA 162 Phase 3 44 45 144 9.1 128.59386 1.07601 13471 5304090015 PILI NUSA TENGGARA TIMUR 159 Phase 2 41 28 823 6.2 124.51057 -9.78979 13472 5318010020 WOLOLELU NUSA TENGGARA TIMUR 574 Phase 1 138 117 162 25.3 121.21786 -8.84937 13473 5307014010 BAGANG NUSA TENGGARA TIMUR 290 Phase 2 86 73 014 15.8 124.13162 -8.34722 13474 8109050006 ULIMA MALUKU 970 Phase 3 156 160 056 30.3 127.22277 -3.96624 13475 5316040009 WATU ASA NUSA TENGGARA TIMUR 722 Phase 3 145 101 935 22.0 119.63179 -9.38463 13476 8206041007 MARATANA JAYA MALUKU UTARA 1 111 Phase 3 281 288 306 58.1 128.50092 1.10419 13477 5304090015 PILI NUSA TENGGARA TIMUR 9 Phase 2 3 2 109 0.5 124.50984 -9.79055 13478 5318010015 WOEWOLO NUSA TENGGARA TIMUR 210 Phase 1 45 38 205 8.2 121.22330 -8.84273 13479 5307014010 BAGANG NUSA TENGGARA TIMUR 244 Phase 2 73 61 977 13.4 124.13327 -8.37346 13480 8109050007 KAMPUNG BARU MALUKU 969 Phase 3 149 152 874 28.9 127.19073 -4.00002 13481 5302011013 NGADU LANGGI NUSA TENGGARA TIMUR 589 Phase 3 133 93 499 20.2 120.06638 -9.82773 13482 8203032002 PELITA JAYA MALUKU UTARA 401 Phase 3 75 76 950 15.5 126.20743 -1.86634 13483 5304090014 FALLAS NUSA TENGGARA TIMUR 515 Phase 2 136 95 608 20.6 124.50877 -9.79232 13484 5318010015 WOEWOLO NUSA TENGGARA TIMUR 323 Phase 1 69 58 581 12.6 121.22201 -8.84035 Annex II – Demand forecast results Page 41 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 13485 5307014010 BAGANG NUSA TENGGARA TIMUR 21 Phase 2 7 5 943 1.3 124.12990 -8.38024 13486 8104023004 PELA MALUKU 664 Phase 3 182 186 732 35.3 127.24262 -3.37612 13487 5302061004 MAIDANG NUSA TENGGARA TIMUR 800 Phase 3 173 121 619 26.2 120.16272 -9.84168 13488 8203032003 WAISAKAI MALUKU UTARA 1 086 Phase 3 177 181 602 36.6 126.26060 -1.86691 13489 5304090015 PILI NUSA TENGGARA TIMUR 160 Phase 2 41 28 823 6.2 124.50873 -9.78783 13490 5311041006 NGGUWA NUSA TENGGARA TIMUR 472 Phase 1 110 93 390 20.2 121.75951 -8.82534 13491 5307014009 MURIABANG NUSA TENGGARA TIMUR 898 Phase 2 223 189 327 40.9 124.13097 -8.38311 13492 8104023003 BATU JUNGKU MALUKU 720 Phase 3 178 182 628 34.5 127.25214 -3.42815 13493 5302031002 PRAIMADITA NUSA TENGGARA TIMUR 62 Phase 3 16 11 248 2.4 120.11677 -10.18056 13494 8205031006 UPT TOGOLIUA MALUKU UTARA 500 Phase 3 132 135 432 27.3 127.86905 1.53749 13495 5304090015 PILI NUSA TENGGARA TIMUR 57 Phase 2 15 10 545 2.3 124.50907 -9.78737 13496 5311041005 KURULIMBU SELATAN NUSA TENGGARA TIMUR 394 Phase 1 110 93 390 20.2 121.75549 -8.83739 13497 5308050015 BAKALEREK NUSA TENGGARA TIMUR 330 Phase 2 74 62 826 13.6 123.38586 -8.41141 13498 8104020004 NAMLEA MALUKU 99 Phase 3 19 19 494 3.7 127.10619 -3.27029 13499 5302011010 TANDULA JANGGA NUSA TENGGARA TIMUR 546 Phase 3 108 75 924 16.4 120.04896 -9.63835 13500 8205031005 WANGONGIRA MALUKU UTARA 407 Phase 3 113 115 938 23.4 127.85989 1.57701 13501 5304090015 PILI NUSA TENGGARA TIMUR 535 Phase 2 136 95 608 20.6 124.51269 -9.78355 13502 5318010019 KOTAGANA NUSA TENGGARA TIMUR 316 Phase 1 82 69 618 15.0 121.23584 -8.87965 13503 5308020010 NUBAHAERAKA NUSA TENGGARA TIMUR 4 Phase 2 2 1 698 0.4 123.52325 -8.50007 13504 8109040003 WAELIKUT MALUKU 52 Phase 3 11 11 286 2.1 126.89384 -3.52564 13505 5302051002 LAI LANJANG NUSA TENGGARA TIMUR 20 Phase 3 5 3 515 0.8 120.69253 -10.04161 13506 8204033010 PAPALOANG MALUKU UTARA 340 Phase 3 65 66 690 13.4 127.51103 -0.66405 13507 5304090015 PILI NUSA TENGGARA TIMUR 1 360 Phase 2 344 241 832 52.2 124.52011 -9.77424 13508 5318010019 KOTAGANA NUSA TENGGARA TIMUR 210 Phase 1 55 46 695 10.1 121.23910 -8.87698 13509 5308020004 LUSILAME NUSA TENGGARA TIMUR 21 Phase 2 8 6 792 1.5 123.52335 -8.51278 13510 8109040003 WAELIKUT MALUKU 64 Phase 3 13 13 338 2.5 126.89636 -3.52487 13511 5302032004 KATIKUTANA NUSA TENGGARA TIMUR 201 Phase 3 52 36 556 7.9 120.26519 -9.98175 13512 8202032006 MESSA MALUKU UTARA 698 Phase 3 164 168 264 33.9 128.29346 0.40022 13513 5304081001 SILLU NUSA TENGGARA TIMUR 38 Phase 2 11 7 733 1.7 124.52382 -9.79939 13514 5318010019 KOTAGANA NUSA TENGGARA TIMUR 97 Phase 1 26 22 074 4.8 121.24170 -8.87211 13515 5308020004 LUSILAME NUSA TENGGARA TIMUR 9 Phase 2 4 3 396 0.7 123.53229 -8.51671 13516 8104030003 AIR BUAYA MALUKU 936 Phase 3 211 216 486 40.9 126.43491 -3.08586 13517 5302032004 KATIKUTANA NUSA TENGGARA TIMUR 217 Phase 3 56 39 368 8.5 120.24429 -9.99445 13518 8202032006 MESSA MALUKU UTARA 219 Phase 3 52 53 352 10.7 128.30397 0.39874 13519 5304081001 SILLU NUSA TENGGARA TIMUR 120 Phase 2 33 23 199 5.0 124.52573 -9.80177 13520 5318020009 KELI NUSA TENGGARA TIMUR 56 Phase 1 14 11 886 2.6 121.25139 -8.86973 13521 5308020004 LUSILAME NUSA TENGGARA TIMUR 21 Phase 2 8 6 792 1.5 123.53533 -8.52115 13522 8107011008 EFFA MALUKU 380 Phase 3 63 64 638 12.2 131.59683 -4.40340 13523 5302061002 LUKU WINGIR NUSA TENGGARA TIMUR 179 Phase 3 42 29 526 6.4 120.29229 -9.74749 13524 8203041002 MADAPUHI MALUKU UTARA 362 Phase 3 84 86 184 17.4 125.58332 -1.81134 13525 5304090014 FALLAS NUSA TENGGARA TIMUR 442 Phase 2 117 82 251 17.7 124.52298 -9.80473 13526 5318020009 KELI NUSA TENGGARA TIMUR 76 Phase 1 18 15 282 3.3 121.26358 -8.87181 13527 5308020004 LUSILAME NUSA TENGGARA TIMUR 93 Phase 2 36 30 564 6.6 123.54417 -8.52302 13528 8107022008 UNDUR MALUKU 11 Phase 3 4 4 104 0.8 130.63282 -3.79294 13529 8203041006 SANIAHAYA MALUKU UTARA 476 Phase 3 104 106 704 21.5 125.60900 -1.82222 13530 5304081002 OELEON NUSA TENGGARA TIMUR 44 Phase 2 12 8 436 1.8 124.57406 -9.78833 13531 5318020012 NGERA NUSA TENGGARA TIMUR 60 Phase 1 17 14 433 3.1 121.26536 -8.86133 13532 5308020004 LUSILAME NUSA TENGGARA TIMUR 44 Phase 2 17 14 433 3.1 123.55392 -8.52207 13533 8107022008 UNDUR MALUKU 419 Phase 3 120 123 120 23.3 130.61512 -3.77600 13534 8203041007 MADAPUHI TRANS MALUKU UTARA 358 Phase 3 100 102 600 20.7 125.57872 -1.84303 13535 5304081002 OELEON NUSA TENGGARA TIMUR 512 Phase 2 136 95 608 20.6 124.57540 -9.79082 13536 5318020010 LEWANGERA NUSA TENGGARA TIMUR 2 Phase 1 1 849 0.2 121.26578 -8.86110 13537 5308020008 LEREK NUSA TENGGARA TIMUR 786 Phase 2 234 198 666 42.9 123.56234 -8.51423 13538 8107021001 DANAMA MALUKU 75 Phase 3 22 22 572 4.3 130.82007 -3.62571 13539 8204010008 OCIMALOLEO MALUKU UTARA 661 Phase 3 171 175 446 35.3 127.68053 -1.70116 13540 5304081003 KAENENO NUSA TENGGARA TIMUR 293 Phase 2 82 57 646 12.4 124.61396 -9.75805 13541 5318020010 LEWANGERA NUSA TENGGARA TIMUR 361 Phase 1 82 69 618 15.0 121.27039 -8.85771 13542 5308020004 LUSILAME NUSA TENGGARA TIMUR 18 Phase 2 7 5 943 1.3 123.54595 -8.53766 13543 8107021003 KILBAT MALUKU 138 Phase 3 42 43 092 8.1 130.81717 -3.59241 13544 8204010009 GAMBARU MALUKU UTARA 567 Phase 3 115 117 990 23.8 127.69406 -1.69897 13545 5304081002 OELEON NUSA TENGGARA TIMUR 139 Phase 2 37 26 011 5.6 124.57691 -9.79988 13546 5318020010 LEWANGERA NUSA TENGGARA TIMUR 32 Phase 1 8 6 792 1.5 121.26509 -8.85542 13547 5308011011 ALAP ATADEI NUSA TENGGARA TIMUR 132 Phase 2 42 35 658 7.7 123.54026 -8.54539 13548 8107021003 KILBAT MALUKU 477 Phase 3 145 148 770 28.1 130.83790 -3.58311 13549 8204081002 SEKELY MALUKU UTARA 723 Phase 3 187 191 862 38.7 128.32007 -0.86352 13550 5304081002 OELEON NUSA TENGGARA TIMUR 35 Phase 2 10 7 030 1.5 124.57661 -9.80150 13551 5318020012 NGERA NUSA TENGGARA TIMUR 12 Phase 1 4 3 396 0.7 121.26487 -8.85546 13552 5308011011 ALAP ATADEI NUSA TENGGARA TIMUR 251 Phase 2 79 67 071 14.5 123.54315 -8.54744 13553 8104021012 LELE MALUKU 409 Phase 3 70 71 820 13.6 126.86177 -3.50549 13554 8204083005 KURUNGA MALUKU UTARA 514 Phase 3 104 106 704 21.5 128.34008 -0.87947 13555 5304100025 NIFULEO NUSA TENGGARA TIMUR 51 Phase 2 14 9 842 2.1 124.58497 -9.80631 13556 5318020012 NGERA NUSA TENGGARA TIMUR 552 Phase 1 152 129 048 27.8 121.25568 -8.85632 13557 5308020007 DULIR NUSA TENGGARA TIMUR 3 Phase 2 1 849 0.2 123.54377 -8.54711 13558 8109020001 WAEMULANG MALUKU 174 Phase 3 48 49 248 9.3 126.16829 -3.58651 13559 8204083006 YOMEN MALUKU UTARA 575 Phase 3 133 136 458 27.5 128.35655 -0.87986 13560 5304100025 NIFULEO NUSA TENGGARA TIMUR 220 Phase 2 59 41 477 8.9 124.58782 -9.80774 13561 5318020010 LEWANGERA NUSA TENGGARA TIMUR 179 Phase 1 41 34 809 7.5 121.27533 -8.85546 13562 5308020007 DULIR NUSA TENGGARA TIMUR 308 Phase 2 87 73 863 15.9 123.55520 -8.55390 13563 8109010009 SEKAT MALUKU 637 Phase 3 170 174 420 33.0 126.16666 -3.56500 13564 8204083007 LIBOBA HIJRAH MALUKU UTARA 416 Phase 3 99 101 574 20.5 128.39429 -0.88108 13565 5304100025 NIFULEO NUSA TENGGARA TIMUR 887 Phase 2 238 167 314 36.1 124.59663 -9.80901 13566 5318020010 LEWANGERA NUSA TENGGARA TIMUR 190 Phase 1 43 36 507 7.9 121.27325 -8.85296 13567 5308050004 NUBA MADO NUSA TENGGARA TIMUR 286 Phase 2 87 73 863 15.9 123.39813 -8.42622 13568 8106033007 TALA MALUKU 54 Phase 3 14 14 364 2.7 128.69673 -3.32578 13569 8204083004 KUKUPANG MALUKU UTARA 1 655 Phase 3 350 359 100 72.4 128.31386 -0.94663 Annex II – Demand forecast results Page 42 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 13570 5304100015 TOI NUSA TENGGARA TIMUR 515 Phase 2 131 92 093 19.9 124.60242 -9.80670 13571 5318020011 WAJO NUSA TENGGARA TIMUR 385 Phase 1 87 73 863 15.9 121.28570 -8.86122 13572 5308050003 BAOLANGU NUSA TENGGARA TIMUR 162 Phase 2 46 39 054 8.4 123.39571 -8.43445 13573 8106033007 TALA MALUKU 71 Phase 3 19 19 494 3.7 128.70492 -3.33233 13574 8205022011 WARUDU MALUKU UTARA 343 Phase 3 85 87 210 17.6 127.98026 1.47343 13575 5304100015 TOI NUSA TENGGARA TIMUR 323 Phase 2 82 57 646 12.4 124.61211 -9.80813 13576 5318020004 KOTAWUJI BARAT NUSA TENGGARA TIMUR 73 Phase 1 19 16 131 3.5 121.28988 -8.86449 13577 5308050002 UDAK MELOMATA NUSA TENGGARA TIMUR 233 Phase 2 68 57 732 12.5 123.38279 -8.44176 13578 8106034005 SANAHU MALUKU 245 Phase 3 54 55 404 10.5 128.72095 -3.31343 13579 8204033004 KUBUNG MALUKU UTARA 446 Phase 3 102 104 652 21.1 127.44915 -0.76210 13580 5304103004 MELLA NUSA TENGGARA TIMUR 514 Phase 2 151 106 153 22.9 124.61192 -9.79636 13581 5318020004 KOTAWUJI BARAT NUSA TENGGARA TIMUR 101 Phase 1 26 22 074 4.8 121.29241 -8.85795 13582 5308050005 PAOBOKOL NUSA TENGGARA TIMUR 249 Phase 2 68 57 732 12.5 123.36832 -8.43464 13583 8106034005 SANAHU MALUKU 269 Phase 3 60 61 560 11.6 128.72625 -3.30731 13584 8205040018 GAMSUNGI MALUKU UTARA 87 Phase 3 27 27 702 5.6 127.99979 1.72543 13585 5304103004 MELLA NUSA TENGGARA TIMUR 194 Phase 2 57 40 071 8.6 124.61441 -9.79622 13586 5318020011 WAJO NUSA TENGGARA TIMUR 201 Phase 1 46 39 054 8.4 121.28814 -8.85458 13587 5308050006 WATOKOBU NUSA TENGGARA TIMUR 626 Phase 2 162 137 538 29.7 123.36028 -8.42973 13588 8106034005 SANAHU MALUKU 38 Phase 3 9 9 234 1.7 128.74793 -3.29300 13589 8204010005 FLUK MALUKU UTARA 975 Phase 3 191 195 966 39.5 127.75577 -1.68623 13590 5304090016 ENONAPI NUSA TENGGARA TIMUR 139 Phase 2 41 28 823 6.2 124.57437 -9.80658 13591 5318020011 WAJO NUSA TENGGARA TIMUR 469 Phase 1 106 89 994 19.4 121.28923 -8.84999 13592 5308040006 WAIENGA NUSA TENGGARA TIMUR 827 Phase 2 96 81 504 17.6 123.59373 -8.35260 13593 8106034006 WASIA MALUKU 334 Phase 3 77 79 002 14.9 128.74866 -3.29251 13594 8272031002 KALAODI MALUKU UTARA 47 Phase 3 11 11 286 2.3 127.41863 0.70173 13595 5304090016 ENONAPI NUSA TENGGARA TIMUR 70 Phase 2 21 14 763 3.2 124.57293 -9.80993 13596 5318020011 WAJO NUSA TENGGARA TIMUR 137 Phase 1 31 26 319 5.7 121.29261 -8.85080 13597 5308040010 LEWOELENG NUSA TENGGARA TIMUR 326 Phase 2 90 76 410 16.5 123.62049 -8.33692 13598 8106010011 BUANO SELATAN MALUKU 719 Phase 3 79 81 054 15.3 127.84424 -3.02133 13599 8272031002 KALAODI MALUKU UTARA 115 Phase 3 27 27 702 5.6 127.41413 0.69797 13600 5304090016 ENONAPI NUSA TENGGARA TIMUR 217 Phase 2 64 44 992 9.7 124.57031 -9.80910 13601 5318020011 WAJO NUSA TENGGARA TIMUR 224 Phase 1 51 43 299 9.3 121.29253 -8.84773 13602 5308040010 LEWOELENG NUSA TENGGARA TIMUR 226 Phase 2 63 53 487 11.5 123.62622 -8.33645 13603 8103142012 KABAUHARI MALUKU 465 Phase 3 302 309 852 58.6 129.62311 -3.05273 13604 8272031002 KALAODI MALUKU UTARA 38 Phase 3 9 9 234 1.9 127.41257 0.70063 13605 5304090016 ENONAPI NUSA TENGGARA TIMUR 102 Phase 2 30 21 090 4.6 124.56809 -9.81306 13606 5318020006 PAUTOLA NUSA TENGGARA TIMUR 362 Phase 1 85 72 165 15.6 121.29364 -8.85625 13607 5308040010 LEWOELENG NUSA TENGGARA TIMUR 24 Phase 2 7 5 943 1.3 123.62648 -8.33881 13608 8103140017 PASAHARI MALUKU 1 394 Phase 3 291 298 566 56.5 129.61758 -2.83701 13609 8205011011 MAKAELING MALUKU UTARA 104 Phase 3 24 24 624 5.0 127.68502 1.05401 13610 5304090016 ENONAPI NUSA TENGGARA TIMUR 5 Phase 2 2 1 406 0.3 124.56714 -9.81515 13611 5318020006 PAUTOLA NUSA TENGGARA TIMUR 812 Phase 1 189 160 461 34.6 121.29936 -8.85548 13612 5308040010 LEWOELENG NUSA TENGGARA TIMUR 51 Phase 2 15 12 735 2.7 123.62676 -8.34046 13613 8104022007 WAEURA MALUKU 108 Phase 3 29 29 754 5.6 126.82036 -3.18081 13614 8202032007 DOTTE MALUKU UTARA 568 Phase 3 112 114 912 23.2 128.35284 0.40206 13615 5304090016 ENONAPI NUSA TENGGARA TIMUR 34 Phase 2 10 7 030 1.5 124.56688 -9.81604 13616 5318020007 LADOLIMA NUSA TENGGARA TIMUR 158 Phase 1 38 32 262 7.0 121.30334 -8.84971 13617 5308040010 LEWOELENG NUSA TENGGARA TIMUR 38 Phase 2 11 9 339 2.0 123.62750 -8.34179 13618 8103052006 TANANAHU MALUKU 344 Phase 3 48 49 248 9.3 128.88824 -3.17536 13619 8272040005 TOSEHO MALUKU UTARA 255 Phase 3 60 61 560 12.4 127.66872 0.35897 13620 5304090016 ENONAPI NUSA TENGGARA TIMUR 70 Phase 2 21 14 763 3.2 124.56567 -9.81862 13621 5318020007 LADOLIMA NUSA TENGGARA TIMUR 132 Phase 1 32 27 168 5.9 121.30354 -8.84760 13622 5308040017 ATAKOWA NUSA TENGGARA TIMUR 288 Phase 2 79 67 071 14.5 123.63467 -8.34608 13623 8103040002 HAYA MALUKU 652 Phase 3 135 138 510 26.2 129.38918 -3.41630 13624 8207010006 GALO GALO MALUKU UTARA 442 Phase 3 127 130 302 26.3 128.19275 2.12545 13625 5304090016 ENONAPI NUSA TENGGARA TIMUR 16 Phase 2 5 3 515 0.8 124.56600 -9.82128 13626 5318020007 LADOLIMA NUSA TENGGARA TIMUR 269 Phase 1 65 55 185 11.9 121.30145 -8.84791 13627 5308040011 LODOTODOKOWA NUSA TENGGARA TIMUR 14 Phase 2 5 4 245 0.9 123.64290 -8.33999 13628 8104020002 SANLEKO MALUKU 19 Phase 3 5 5 130 1.0 127.03804 -3.29725 13629 8205011005 GAMSUNGI MALUKU UTARA 107 Phase 3 31 31 806 6.4 127.64652 1.04539 13630 5304090016 ENONAPI NUSA TENGGARA TIMUR 80 Phase 2 24 16 872 3.6 124.56724 -9.82162 13631 5318020007 LADOLIMA NUSA TENGGARA TIMUR 187 Phase 1 45 38 205 8.2 121.30480 -8.84670 13632 5308040011 LODOTODOKOWA NUSA TENGGARA TIMUR 31 Phase 2 9 7 641 1.6 123.64236 -8.33798 13633 8109040003 WAELIKUT MALUKU 553 Phase 3 111 113 886 21.5 126.95800 -3.76403 13634 8205011005 GAMSUNGI MALUKU UTARA 117 Phase 3 33 33 858 6.8 127.64923 1.02054 13635 5304090016 ENONAPI NUSA TENGGARA TIMUR 226 Phase 2 67 47 101 10.2 124.56597 -9.82616 13636 5318020006 PAUTOLA NUSA TENGGARA TIMUR 147 Phase 1 35 29 715 6.4 121.30178 -8.85950 13637 5308040011 LODOTODOKOWA NUSA TENGGARA TIMUR 186 Phase 2 54 45 846 9.9 123.64225 -8.33591 13638 8106010010 WAESALA MALUKU 326 Phase 3 74 75 924 14.4 127.88842 -3.26153 13639 8205011008 TABANOMA MALUKU UTARA 277 Phase 3 69 70 794 14.3 127.64881 1.01855 13640 5304090016 ENONAPI NUSA TENGGARA TIMUR 32 Phase 2 10 7 030 1.5 124.56468 -9.83082 13641 5313140010 MATA AIR NUSA TENGGARA TIMUR 84 Phase 1 22 18 678 4.0 120.48014 -8.29456 13642 5308040011 LODOTODOKOWA NUSA TENGGARA TIMUR 36 Phase 2 11 9 339 2.0 123.64486 -8.33493 13643 8103141009 PAA MALUKU 166 Phase 3 50 51 300 9.7 129.05142 -2.87845 13644 8205011004 AKELAMO KAO MALUKU UTARA 73 Phase 3 22 22 572 4.5 127.64389 1.00044 13645 5304090016 ENONAPI NUSA TENGGARA TIMUR 294 Phase 2 87 61 161 13.2 124.56011 -9.83088 13646 5313140010 MATA AIR NUSA TENGGARA TIMUR 80 Phase 1 21 17 829 3.8 120.47508 -8.29534 13647 5308040009 LAMADALE NUSA TENGGARA TIMUR 346 Phase 2 99 84 051 18.1 123.63915 -8.32030 13648 8107030019 GUSALAUT MALUKU 433 Phase 3 100 102 600 19.4 130.32816 -3.60977 13649 8205011004 AKELAMO KAO MALUKU UTARA 152 Phase 3 44 45 144 9.1 127.64513 0.99852 13650 5304112002 SABNALA NUSA TENGGARA TIMUR 249 Phase 2 67 47 101 10.2 124.74199 -9.63247 13651 5313140010 MATA AIR NUSA TENGGARA TIMUR 17 Phase 1 5 4 245 0.9 120.47163 -8.29605 13652 5308040015 TAPOLANGU NUSA TENGGARA TIMUR 112 Phase 2 29 24 621 5.3 123.63849 -8.31923 13653 8106011006 MASAWOI MALUKU 595 Phase 3 128 131 328 24.8 127.55727 -3.26503 13654 8203022002 FATKAUYON MALUKU UTARA 30 Phase 3 7 7 182 1.4 126.06212 -2.45017 Annex II – Demand forecast results Page 43 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 13655 5304081001 SILLU NUSA TENGGARA TIMUR 226 Phase 2 62 43 586 9.4 124.53185 -9.80563 13656 5313140011 SALAMA NUSA TENGGARA TIMUR 209 Phase 1 54 45 846 9.9 120.47054 -8.29616 13657 5308040015 TAPOLANGU NUSA TENGGARA TIMUR 141 Phase 2 37 31 413 6.8 123.62111 -8.30414 13658 8107022007 KUMELANG MALUKU 144 Phase 3 44 45 144 8.5 130.60727 -3.76217 13659 8203022002 FATKAUYON MALUKU UTARA 51 Phase 3 11 11 286 2.3 126.06820 -2.45336 13660 5306080014 MAKIR NUSA TENGGARA TIMUR 180 Phase 2 49 34 447 7.4 125.16324 -9.04756 13661 5313140011 SALAMA NUSA TENGGARA TIMUR 2 Phase 1 1 849 0.2 120.46508 -8.29609 13662 5308040008 DIKESARE NUSA TENGGARA TIMUR 410 Phase 2 120 101 880 22.0 123.63625 -8.29254 13663 8103040002 HAYA MALUKU 298 Phase 3 62 63 612 12.0 129.49258 -3.45558 13664 8203022002 FATKAUYON MALUKU UTARA 132 Phase 3 27 27 702 5.6 126.06625 -2.45681 13665 5306080015 LAMAK SENULU NUSA TENGGARA TIMUR 900 Phase 2 261 183 483 39.6 125.15576 -9.04274 13666 5313140011 SALAMA NUSA TENGGARA TIMUR 53 Phase 1 14 11 886 2.6 120.46681 -8.30054 13667 5308060018 LEBEWALA NUSA TENGGARA TIMUR 675 Phase 2 180 152 820 33.0 123.66002 -8.25603 13668 8107030020 TUM MALUKU 501 Phase 3 133 136 458 25.8 130.39338 -3.62287 13669 8203022002 FATKAUYON MALUKU UTARA 21 Phase 3 5 5 130 1.0 126.06326 -2.46154 13670 5304061007 NUNUSUNU NUSA TENGGARA TIMUR 152 Phase 2 35 24 605 5.3 124.40727 -10.09607 13671 5313140011 SALAMA NUSA TENGGARA TIMUR 248 Phase 1 64 54 336 11.7 120.46615 -8.30404 13672 5308060019 WAILOLONG NUSA TENGGARA TIMUR 604 Phase 2 142 120 558 26.0 123.65828 -8.25482 13673 8107022001 SELOR MALUKU 302 Phase 3 70 71 820 13.6 130.44150 -3.64925 13674 8203022001 WAILIA MALUKU UTARA 636 Phase 3 120 123 120 24.8 126.02558 -2.46335 13675 5304061007 NUNUSUNU NUSA TENGGARA TIMUR 821 Phase 2 189 132 867 28.7 124.40176 -10.09211 13676 5313140011 SALAMA NUSA TENGGARA TIMUR 36 Phase 1 10 8 490 1.8 120.46712 -8.31237 13677 5308040015 TAPOLANGU NUSA TENGGARA TIMUR 212 Phase 2 55 46 695 10.1 123.61822 -8.30671 13678 8107022012 MISING MALUKU 472 Phase 3 129 132 354 25.0 130.45421 -3.66135 13679 8204080014 BALITATA MALUKU UTARA 585 Phase 3 147 150 822 30.4 127.89585 -0.42485 13680 5304112002 SABNALA NUSA TENGGARA TIMUR 125 Phase 2 34 23 902 5.2 124.74273 -9.62956 13681 5313140011 SALAMA NUSA TENGGARA TIMUR 348 Phase 1 90 76 410 16.5 120.46945 -8.31300 13682 5309050004 WATANHURA NUSA TENGGARA TIMUR 76 Phase 2 21 17 829 3.8 123.06110 -8.48975 13683 8107021004 SESAR MALUKU 286 Phase 3 58 59 508 11.3 130.79592 -3.58016 13684 8203060004 KAWALO MALUKU UTARA 1 368 Phase 3 324 332 424 67.0 124.54392 -2.00909 13685 5304112003 KOL OTO NUSA TENGGARA TIMUR 52 Phase 2 20 14 060 3.0 124.74363 -9.62842 13686 5313140014 WANGKUNG NUSA TENGGARA TIMUR 139 Phase 1 31 26 319 5.7 120.46447 -8.29576 13687 5309050004 WATANHURA NUSA TENGGARA TIMUR 71 Phase 2 20 16 980 3.7 123.06462 -8.48943 13688 8107022007 KUMELANG MALUKU 223 Phase 3 69 70 794 13.4 130.59664 -3.75239 13689 8202043003 PENITI MALUKU UTARA 186 Phase 3 35 35 910 7.2 128.68203 0.43254 13690 5306012003 SESERAI NUSA TENGGARA TIMUR 280 Phase 2 66 46 398 10.0 124.81973 -9.70397 13691 5313140014 WANGKUNG NUSA TENGGARA TIMUR 81 Phase 1 18 15 282 3.3 120.45724 -8.29105 13692 5309050004 WATANHURA NUSA TENGGARA TIMUR 144 Phase 2 39 33 111 7.1 123.07572 -8.48800 13693 8104030003 AIR BUAYA MALUKU 397 Phase 3 90 92 340 17.5 126.37006 -3.09677 13694 8202043005 SAKAM MALUKU UTARA 32 Phase 3 7 7 182 1.4 128.68250 0.43346 13695 5306012004 LOROTOLUS NUSA TENGGARA TIMUR 90 Phase 2 23 16 169 3.5 124.82041 -9.70423 13696 5313140014 WANGKUNG NUSA TENGGARA TIMUR 395 Phase 1 88 74 712 16.1 120.45550 -8.28828 13697 5309050005 LEBAO NUSA TENGGARA TIMUR 314 Phase 2 70 59 430 12.8 123.08612 -8.48183 13698 8104030003 AIR BUAYA MALUKU 83 Phase 3 19 19 494 3.7 126.33064 -3.10321 13699 8202043005 SAKAM MALUKU UTARA 107 Phase 3 24 24 624 5.0 128.68489 0.43941 13700 5304112003 KOL OTO NUSA TENGGARA TIMUR 137 Phase 2 51 35 853 7.7 124.74474 -9.62668 13701 5313140014 WANGKUNG NUSA TENGGARA TIMUR 264 Phase 1 59 50 091 10.8 120.45344 -8.28678 13702 5309050005 LEBAO NUSA TENGGARA TIMUR 41 Phase 2 10 8 490 1.8 123.08908 -8.47959 13703 8104030002 TANJUNG KARANG MALUKU 308 Phase 3 72 73 872 14.0 126.32043 -3.10004 13704 8202043005 SAKAM MALUKU UTARA 643 Phase 3 140 143 640 28.9 128.66932 0.48863 13705 5304070014 OEEKAM NUSA TENGGARA TIMUR 704 Phase 2 209 146 927 31.7 124.47466 -9.93426 13706 5312070018 INEGENA NUSA TENGGARA TIMUR 663 Phase 1 134 113 766 24.5 120.99591 -8.68792 13707 5309050005 LEBAO NUSA TENGGARA TIMUR 106 Phase 2 24 20 376 4.4 123.09025 -8.47924 13708 8104030002 TANJUNG KARANG MALUKU 287 Phase 3 67 68 742 13.0 126.31474 -3.09802 13709 8204081008 TAWA MALUKU UTARA 509 Phase 3 133 136 458 27.5 128.07001 -0.71764 13710 5304060008 KAKAN NUSA TENGGARA TIMUR 1 202 Phase 2 276 194 028 41.9 124.47029 -9.99916 13711 5318060018 MBAY II NUSA TENGGARA TIMUR 18 Phase 1 5 4 245 0.9 121.24171 -8.49525 13712 5309050005 LEBAO NUSA TENGGARA TIMUR 138 Phase 2 31 26 319 5.7 123.09251 -8.47847 13713 8104030002 TANJUNG KARANG MALUKU 194 Phase 3 45 46 170 8.7 126.29534 -3.09800 13714 8204080011 LEMO LEMO MALUKU UTARA 557 Phase 3 140 143 640 28.9 128.00233 -0.66311 13715 5306012008 BADARAI NUSA TENGGARA TIMUR 35 Phase 2 9 6 327 1.4 124.86251 -9.70423 13716 5318060018 MBAY II NUSA TENGGARA TIMUR 597 Phase 1 146 123 954 26.7 121.23966 -8.48942 13717 5307014009 MURIABANG NUSA TENGGARA TIMUR 147 Phase 2 37 31 413 6.8 124.13473 -8.39317 13718 8104030002 TANJUNG KARANG MALUKU 384 Phase 3 90 92 340 17.5 126.28260 -3.10993 13719 8204080034 TABAMASA MALUKU UTARA 269 Phase 3 73 74 898 15.1 127.99405 -0.63696 13720 5306012008 BADARAI NUSA TENGGARA TIMUR 8 Phase 2 2 1 406 0.3 124.85780 -9.70749 13721 5318060016 NGGOLONIO NUSA TENGGARA TIMUR 54 Phase 1 15 12 735 2.7 121.24159 -8.49580 13722 5307014005 EKA JAYA NUSA TENGGARA TIMUR 41 Phase 2 12 10 188 2.2 124.13404 -8.39446 13723 8107011009 ILILI MALUKU 429 Phase 3 75 76 950 14.6 131.57782 -4.37700 13724 8204080012 PAPACEDA MALUKU UTARA 689 Phase 3 180 184 680 37.2 127.97219 -0.58480 13725 5306012008 BADARAI NUSA TENGGARA TIMUR 30 Phase 2 8 5 624 1.2 124.85682 -9.70911 13726 5313140010 MATA AIR NUSA TENGGARA TIMUR 181 Phase 1 46 39 054 8.4 120.48612 -8.29396 13727 5307014005 EKA JAYA NUSA TENGGARA TIMUR 166 Phase 2 47 39 903 8.6 124.12592 -8.39302 13728 8109010001 WALBELE MALUKU 457 Phase 3 117 120 042 22.7 126.15132 -3.52416 13729 8204010006 BOBO MALUKU UTARA 453 Phase 3 89 91 314 18.4 127.87869 -1.68661 13730 5306012006 WEOE NUSA TENGGARA TIMUR 56 Phase 2 16 11 248 2.4 124.85368 -9.71181 13731 5311020009 TINABANI NUSA TENGGARA TIMUR 173 Phase 1 39 33 111 7.1 121.68819 -8.73730 13732 5307014005 EKA JAYA NUSA TENGGARA TIMUR 61 Phase 2 17 14 433 3.1 124.12461 -8.39272 13733 8104020004 NAMLEA MALUKU 21 Phase 3 4 4 104 0.8 127.10810 -3.26555 13734 8204010006 BOBO MALUKU UTARA 1 282 Phase 3 252 258 552 52.1 127.88185 -1.68406 13735 5306012006 WEOE NUSA TENGGARA TIMUR 145 Phase 2 40 28 120 6.1 124.85166 -9.70924 13736 5311020009 TINABANI NUSA TENGGARA TIMUR 279 Phase 1 63 53 487 11.5 121.67925 -8.72857 13737 5309050015 LEWOGEKA NUSA TENGGARA TIMUR 493 Phase 2 77 65 373 14.1 123.06786 -8.45012 13738 8104021014 WAENETAT MALUKU 80 Phase 3 23 23 598 4.5 126.97232 -3.40636 13739 8201131001 TABOBOL MALUKU UTARA 417 Phase 3 104 106 704 21.5 127.47155 1.31570 Annex II – Demand forecast results Page 44 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 13740 5306012006 WEOE NUSA TENGGARA TIMUR 301 Phase 2 83 58 349 12.6 124.85061 -9.71373 13741 5311020009 TINABANI NUSA TENGGARA TIMUR 508 Phase 1 114 96 786 20.9 121.67977 -8.72555 13742 5307014001 TUBE NUSA TENGGARA TIMUR 126 Phase 2 30 25 470 5.5 124.11975 -8.40130 13743 8104020004 NAMLEA MALUKU 125 Phase 3 24 24 624 4.7 127.11668 -3.27314 13744 8204081001 DOWORA MALUKU UTARA 935 Phase 3 243 249 318 50.2 128.10505 -0.84980 13745 5306012004 LOROTOLUS NUSA TENGGARA TIMUR 69 Phase 2 18 12 654 2.7 124.84061 -9.71010 13746 5313140014 WANGKUNG NUSA TENGGARA TIMUR 71 Phase 1 16 13 584 2.9 120.45167 -8.28586 13747 5307014001 TUBE NUSA TENGGARA TIMUR 512 Phase 2 120 101 880 22.0 124.12095 -8.40460 13748 8104021018 WAEKERTA MALUKU 40 Phase 3 11 11 286 2.1 126.95357 -3.34088 13749 8201140022 KAHATOLA MALUKU UTARA 522 Phase 3 118 121 068 24.4 127.51879 1.68406 13750 5306012004 LOROTOLUS NUSA TENGGARA TIMUR 52 Phase 2 14 9 842 2.1 124.83756 -9.71318 13751 5313140014 WANGKUNG NUSA TENGGARA TIMUR 293 Phase 1 65 55 185 11.9 120.44854 -8.28679 13752 5309021002 ILE PADUNG NUSA TENGGARA TIMUR 203 Phase 2 45 38 205 8.2 122.86650 -8.29431 13753 8171031004 WAIYAME MALUKU 6 Phase 3 2 2 052 0.4 128.15875 -3.64546 13754 8204053006 GETI BARU MALUKU UTARA 397 Phase 3 98 100 548 20.3 127.49439 -0.34084 13755 5306012004 LOROTOLUS NUSA TENGGARA TIMUR 187 Phase 2 47 33 041 7.1 124.83711 -9.71690 13756 5313140014 WANGKUNG NUSA TENGGARA TIMUR 166 Phase 1 37 31 413 6.8 120.44787 -8.29004 13757 5307012011 BATU NUSA TENGGARA TIMUR 284 Phase 2 75 63 675 13.7 124.30548 -8.24744 13758 8171031005 RUMAH TIGA MALUKU 34 Phase 3 7 7 182 1.4 128.15872 -3.64508 13759 8204053006 GETI BARU MALUKU UTARA 230 Phase 3 57 58 482 11.8 127.50660 -0.33118 13760 5306012004 LOROTOLUS NUSA TENGGARA TIMUR 138 Phase 2 35 24 605 5.3 124.83146 -9.71353 13761 5313140014 WANGKUNG NUSA TENGGARA TIMUR 180 Phase 1 40 33 960 7.3 120.44043 -8.28781 13762 5307012011 BATU NUSA TENGGARA TIMUR 54 Phase 2 15 12 735 2.7 124.31369 -8.24337 13763 8171031004 WAIYAME MALUKU 50 Phase 3 10 10 260 1.9 128.15735 -3.64546 13764 8204053007 GETI LAMA MALUKU UTARA 329 Phase 3 95 97 470 19.6 127.51867 -0.32127 13765 5306012004 LOROTOLUS NUSA TENGGARA TIMUR 47 Phase 2 12 8 436 1.8 124.82685 -9.71745 13766 5313140014 WANGKUNG NUSA TENGGARA TIMUR 144 Phase 1 32 27 168 5.9 120.43311 -8.29306 13767 5307012011 BATU NUSA TENGGARA TIMUR 344 Phase 2 90 76 410 16.5 124.31509 -8.24077 13768 8171031005 RUMAH TIGA MALUKU 28 Phase 3 6 6 156 1.2 128.15725 -3.64507 13769 8206033006 HILAITETOR MALUKU UTARA 820 Phase 3 202 207 252 41.8 128.18702 1.38383 13770 5306012004 LOROTOLUS NUSA TENGGARA TIMUR 122 Phase 2 31 21 793 4.7 124.82263 -9.71574 13771 5313140014 WANGKUNG NUSA TENGGARA TIMUR 142 Phase 1 32 27 168 5.9 120.43781 -8.30842 13772 5308011006 BELOBAO NUSA TENGGARA TIMUR 33 Phase 2 10 8 490 1.8 123.40849 -8.53575 13773 8106010011 BUANO SELATAN MALUKU 485 Phase 3 53 54 378 10.3 127.87470 -3.03396 13774 8206033001 IGA MALUKU UTARA 1 110 Phase 3 237 243 162 49.0 128.29789 1.43153 13775 5306012003 SESERAI NUSA TENGGARA TIMUR 200 Phase 2 47 33 041 7.1 124.82157 -9.71703 13776 5313140016 WATU BAUR NUSA TENGGARA TIMUR 248 Phase 1 63 53 487 11.5 120.42037 -8.31459 13777 5307012010 MERDEKA NUSA TENGGARA TIMUR 97 Phase 2 29 24 621 5.3 124.28060 -8.24742 13778 8106010011 BUANO SELATAN MALUKU 116 Phase 3 13 13 338 2.5 127.94820 -3.01328 13779 8206033002 LABI LABI MALUKU UTARA 1 040 Phase 3 208 213 408 43.0 128.34818 1.46442 13780 5306012003 SESERAI NUSA TENGGARA TIMUR 128 Phase 2 30 21 090 4.6 124.81877 -9.72239 13781 5313140016 WATU BAUR NUSA TENGGARA TIMUR 291 Phase 1 74 62 826 13.6 120.41784 -8.31627 13782 5307012010 MERDEKA NUSA TENGGARA TIMUR 305 Phase 2 89 75 561 16.3 124.27857 -8.24390 13783 8104030001 BARA MALUKU 505 Phase 3 110 112 860 21.3 126.23553 -3.13370 13784 8204022004 WOOI MALUKU UTARA 1 233 Phase 3 280 287 280 57.9 127.98942 -1.70201 13785 5306012004 LOROTOLUS NUSA TENGGARA TIMUR 66 Phase 2 17 11 951 2.6 124.82286 -9.72438 13786 5313140014 WANGKUNG NUSA TENGGARA TIMUR 1 226 Phase 1 271 230 079 49.6 120.42803 -8.32813 13787 5307010043 PANDAI NUSA TENGGARA TIMUR 214 Phase 2 53 44 997 9.7 124.27271 -8.22463 13788 8104021013 WAEGEREN MALUKU 115 Phase 3 29 29 754 5.6 126.90146 -3.39842 13789 8204041001 TABANGAME MALUKU UTARA 354 Phase 3 103 105 678 21.3 127.59787 -0.76611 13790 5306012003 SESERAI NUSA TENGGARA TIMUR 81 Phase 2 19 13 357 2.9 124.82258 -9.72511 13791 5313140017 RURA NUSA TENGGARA TIMUR 549 Phase 1 141 119 709 25.8 120.43034 -8.34358 13792 5307010041 HELANDOHI NUSA TENGGARA TIMUR 509 Phase 2 148 125 652 27.1 124.28678 -8.21006 13793 8109010001 WALBELE MALUKU 186 Phase 3 48 49 248 9.3 126.13770 -3.51212 13794 8204080013 OHA MALUKU UTARA 625 Phase 3 153 156 978 31.6 127.92855 -0.49409 13795 5306012003 SESERAI NUSA TENGGARA TIMUR 549 Phase 2 128 89 984 19.4 124.81916 -9.72870 13796 5313040036 JAONG NUSA TENGGARA TIMUR 187 Phase 1 44 37 356 8.1 120.37772 -8.63572 13797 5307010040 MUNASELI NUSA TENGGARA TIMUR 261 Phase 2 56 47 544 10.3 124.28872 -8.21094 13798 8104021015 KUBALAHIN MALUKU 9 Phase 3 4 4 104 0.8 126.93387 -3.35906 13799 8204031001 YOYOK MALUKU UTARA 433 Phase 3 124 127 224 25.6 127.19379 -0.68596 13800 5306012003 SESERAI NUSA TENGGARA TIMUR 234 Phase 2 55 38 665 8.3 124.82094 -9.73186 13801 5315040002 RANGGU NUSA TENGGARA TIMUR 635 Phase 1 149 126 501 27.3 120.25581 -8.58406 13802 5310070015 MAHEBORA NUSA TENGGARA TIMUR 86 Phase 2 24 20 376 4.4 122.11203 -8.65153 13803 8107040016 KARAY MALUKU 329 Phase 3 72 73 872 14.0 130.71611 -3.40378 13804 8204031002 TABALEMA MALUKU UTARA 234 Phase 3 49 50 274 10.1 127.18862 -0.69589 13805 5306012010 WESEBEN NUSA TENGGARA TIMUR 651 Phase 2 143 100 529 21.7 124.82473 -9.74186 13806 5313041008 HILIHINTIR NUSA TENGGARA TIMUR 878 Phase 1 177 150 273 32.4 120.36906 -8.77655 13807 5310070010 RIIT NUSA TENGGARA TIMUR 43 Phase 2 12 10 188 2.2 122.11224 -8.65117 13808 8104021005 PARBULU MALUKU 74 Phase 3 21 21 546 4.1 126.99966 -3.43346 13809 8203042002 BUYA MALUKU UTARA 30 Phase 3 7 7 182 1.4 125.58182 -1.92806 13810 5306012002 ALKANI NUSA TENGGARA TIMUR 1 092 Phase 2 248 174 344 37.6 124.82879 -9.74394 13811 5315040002 RANGGU NUSA TENGGARA TIMUR 122 Phase 1 29 24 621 5.3 120.25291 -8.58582 13812 5310042024 ILINMEDO NUSA TENGGARA TIMUR 95 Phase 2 24 20 376 4.4 122.58775 -8.56417 13813 8109010001 WALBELE MALUKU 253 Phase 3 65 66 690 12.6 126.09910 -3.48061 13814 8204060006 BULI MALUKU UTARA 303 Phase 3 114 116 964 23.6 127.26078 -0.07633 13815 5306012002 ALKANI NUSA TENGGARA TIMUR 304 Phase 2 70 49 210 10.6 124.82374 -9.74502 13816 5315040002 RANGGU NUSA TENGGARA TIMUR 214 Phase 1 50 42 450 9.2 120.24871 -8.58090 13817 5308011008 PANTAI HARAPAN NUSA TENGGARA TIMUR 681 Phase 2 193 163 857 35.4 123.45338 -8.52465 13818 8109010001 WALBELE MALUKU 178 Phase 3 46 47 196 8.9 126.08977 -3.48225 13819 8204060011 LELEI MALUKU UTARA 317 Phase 3 100 102 600 20.7 127.24634 -0.03233 13820 5304071005 BABUIN NUSA TENGGARA TIMUR 41 Phase 2 13 9 139 2.0 124.51561 -9.95725 13821 5315040018 TENGKU NUSA TENGGARA TIMUR 86 Phase 1 19 16 131 3.5 120.24087 -8.57920 13822 5308010008 LUSIDUAWUTUN NUSA TENGGARA TIMUR 471 Phase 2 143 121 407 26.2 123.35672 -8.51569 13823 8103140010 SAWAI MALUKU 64 Phase 3 30 30 780 5.8 129.18134 -2.94245 13824 8204060011 LELEI MALUKU UTARA 156 Phase 3 50 51 300 10.3 127.25044 -0.02734 Annex II – Demand forecast results Page 45 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 13825 5304071005 BABUIN NUSA TENGGARA TIMUR 211 Phase 2 64 44 992 9.7 124.51548 -9.95785 13826 5315040018 TENGKU NUSA TENGGARA TIMUR 361 Phase 1 78 66 222 14.3 120.23388 -8.57668 13827 5309032006 BAMA NUSA TENGGARA TIMUR 52 Phase 2 15 12 735 2.7 122.88046 -8.37475 13828 8106010008 TAHALUPU MALUKU 470 Phase 3 114 116 964 22.1 127.69680 -3.18009 13829 8204060011 LELEI MALUKU UTARA 209 Phase 3 66 67 716 13.6 127.24873 -0.02621 13830 5306011016 NABUTAEK NUSA TENGGARA TIMUR 22 Phase 2 5 3 515 0.8 124.73748 -9.62128 13831 5315040018 TENGKU NUSA TENGGARA TIMUR 116 Phase 1 26 22 074 4.8 120.22894 -8.57565 13832 5309032006 BAMA NUSA TENGGARA TIMUR 354 Phase 2 96 81 504 17.6 122.88097 -8.37614 13833 8103040001 SALAMAHU MALUKU 215 Phase 3 54 55 404 10.5 129.41095 -3.41738 13834 8204060012 TALIMAU MALUKU UTARA 708 Phase 3 188 192 888 38.9 127.20134 -0.02279 13835 5306011016 NABUTAEK NUSA TENGGARA TIMUR 244 Phase 2 54 37 962 8.2 124.73254 -9.62091 13836 5315031009 DUNTA NUSA TENGGARA TIMUR 147 Phase 1 38 32 262 7.0 120.22710 -8.57880 13837 5307014005 EKA JAYA NUSA TENGGARA TIMUR 332 Phase 2 93 78 957 17.0 124.13775 -8.42824 13838 8109020014 FAKAL MALUKU 278 Phase 3 68 69 768 13.2 126.52766 -3.62462 13839 8206042009 UPT PATLIAN SP II MALUKU UTARA 233 Phase 3 69 70 794 14.3 128.65165 1.45224 13840 5306011016 NABUTAEK NUSA TENGGARA TIMUR 7 Phase 2 2 1 406 0.3 124.73081 -9.61550 13841 5315031009 DUNTA NUSA TENGGARA TIMUR 188 Phase 1 48 40 752 8.8 120.23006 -8.58502 13842 5307014004 MAUTA NUSA TENGGARA TIMUR 1 399 Phase 2 367 311 583 67.2 124.13046 -8.46305 13843 8109020011 MNGESWAEN MALUKU 789 Phase 3 93 95 418 18.0 126.49599 -3.61726 13844 8272051003 AKELAMO MALUKU UTARA 192 Phase 3 46 47 196 9.5 127.56208 0.55562 13845 5306011005 BIUDUKFOHO NUSA TENGGARA TIMUR 27 Phase 2 6 4 218 0.9 124.73105 -9.61512 13846 5315031009 DUNTA NUSA TENGGARA TIMUR 68 Phase 1 18 15 282 3.3 120.22759 -8.59561 13847 5310041009 RUNUT NUSA TENGGARA TIMUR 100 Phase 2 24 20 376 4.4 122.50189 -8.62381 13848 8109020020 WAEKATIN MALUKU 188 Phase 3 78 80 028 15.1 126.52699 -3.56696 13849 8203042001 AUPONHIA MALUKU UTARA 909 Phase 3 179 183 654 37.0 125.49437 -1.89510 13850 5306011010 NAE T NUSA TENGGARA TIMUR 57 Phase 2 14 9 842 2.1 124.73134 -9.61052 13851 5315031009 DUNTA NUSA TENGGARA TIMUR 119 Phase 1 31 26 319 5.7 120.22973 -8.59860 13852 5307013007 KALONDAMA TENGAH NUSA TENGGARA TIMUR 432 Phase 2 124 105 276 22.7 124.00622 -8.40870 13853 8109020020 WAEKATIN MALUKU 29 Phase 3 13 13 338 2.5 126.52759 -3.56500 13854 8204053008 GILALANG MALUKU UTARA 373 Phase 3 76 77 976 15.7 127.56405 -0.31538 13855 5306011005 BIUDUKFOHO NUSA TENGGARA TIMUR 42 Phase 2 10 7 030 1.5 124.73238 -9.61028 13856 5315040001 GOLO WEDONG NUSA TENGGARA TIMUR 949 Phase 1 252 213 948 46.2 120.23585 -8.59750 13857 5307013006 KALONDAMA BARAT NUSA TENGGARA TIMUR 426 Phase 2 117 99 333 21.4 123.97374 -8.40954 13858 8109020020 WAEKATIN MALUKU 73 Phase 3 31 31 806 6.0 126.54218 -3.55359 13859 8204040017 TIMLONGA MALUKU UTARA 255 Phase 3 68 69 768 14.1 127.59017 -0.35888 13860 5306011010 NAE T NUSA TENGGARA TIMUR 352 Phase 2 87 61 161 13.2 124.73186 -9.60452 13861 5315031005 GURUNG NUSA TENGGARA TIMUR 692 Phase 1 149 126 501 27.3 120.23953 -8.60723 13862 5307013002 ALLUMANG NUSA TENGGARA TIMUR 617 Phase 2 177 150 273 32.4 123.95286 -8.39449 13863 8109020020 WAEKATIN MALUKU 27 Phase 3 12 12 312 2.3 126.54138 -3.55217 13864 8204040016 GORO GORO MALUKU UTARA 590 Phase 3 147 150 822 30.4 127.61257 -0.38739 13865 5306011005 BIUDUKFOHO NUSA TENGGARA TIMUR 604 Phase 2 134 94 202 20.3 124.73833 -9.60639 13866 5315031005 GURUNG NUSA TENGGARA TIMUR 208 Phase 1 45 38 205 8.2 120.23128 -8.61287 13867 5307013001 MARISA NUSA TENGGARA TIMUR 56 Phase 2 12 10 188 2.2 123.94047 -8.37531 13868 8109020020 WAEKATIN MALUKU 79 Phase 3 33 33 858 6.4 126.54987 -3.55291 13869 8205022012 DOWONGI MAITI MALUKU UTARA 257 Phase 3 79 81 054 16.3 128.02096 1.46427 13870 5306011005 BIUDUKFOHO NUSA TENGGARA TIMUR 68 Phase 2 16 11 248 2.4 124.74193 -9.60525 13871 5315031005 GURUNG NUSA TENGGARA TIMUR 181 Phase 1 39 33 111 7.1 120.22743 -8.61186 13872 5307013001 MARISA NUSA TENGGARA TIMUR 461 Phase 2 97 82 353 17.8 123.94012 -8.37381 13873 8109020020 WAEKATIN MALUKU 38 Phase 3 16 16 416 3.1 126.55447 -3.55417 13874 8204061004 FOFAO MALUKU UTARA 210 Phase 3 48 49 248 9.9 127.14533 -0.19060 13875 5306011004 WEBETUN NUSA TENGGARA TIMUR 20 Phase 2 5 3 515 0.8 124.74802 -9.60356 13876 5315031005 GURUNG NUSA TENGGARA TIMUR 109 Phase 1 24 20 376 4.4 120.22674 -8.61648 13877 5307013001 MARISA NUSA TENGGARA TIMUR 522 Phase 3 110 93 390 20.2 123.95351 -8.35271 13878 8109020020 WAEKATIN MALUKU 61 Phase 3 26 26 676 5.0 126.56285 -3.55255 13879 8204031002 TABALEMA MALUKU UTARA 206 Phase 3 43 44 118 8.9 127.16916 -0.70864 13880 5306011004 WEBETUN NUSA TENGGARA TIMUR 67 Phase 2 15 10 545 2.3 124.74953 -9.60470 13881 5315031005 GURUNG NUSA TENGGARA TIMUR 320 Phase 1 69 58 581 12.6 120.22004 -8.62141 13882 5307013001 MARISA NUSA TENGGARA TIMUR 55 Phase 3 12 10 188 2.2 123.95384 -8.34830 13883 8103143003 SETI MALUKU 134 Phase 3 29 29 754 5.6 129.92158 -3.03833 13884 8201091016 BRAHA MALUKU UTARA 284 Phase 3 67 68 742 13.8 127.67870 0.79724 13885 5306011005 BIUDUKFOHO NUSA TENGGARA TIMUR 43 Phase 2 10 7 030 1.5 124.74884 -9.60552 13886 5315031008 WATU UMPU NUSA TENGGARA TIMUR 1 140 Phase 1 286 242 814 52.4 120.20801 -8.61962 13887 5307013003 KAYANG NUSA TENGGARA TIMUR 703 Phase 3 131 111 219 24.0 123.96639 -8.34890 13888 8109020013 WAELO MALUKU 426 Phase 3 177 181 602 34.3 126.56465 -3.48247 13889 8204060017 GUNANGE MALUKU UTARA 262 Phase 3 67 68 742 13.8 127.22835 0.02360 13890 5306011005 BIUDUKFOHO NUSA TENGGARA TIMUR 284 Phase 2 63 44 289 9.6 124.74737 -9.61145 13891 5315031005 GURUNG NUSA TENGGARA TIMUR 139 Phase 1 30 25 470 5.5 120.22983 -8.62898 13892 5307013004 LAMMA NUSA TENGGARA TIMUR 144 Phase 3 46 39 054 8.4 123.97684 -8.34082 13893 8103140013 ROHO MALUKU 380 Phase 3 87 89 262 16.9 129.40911 -2.87419 13894 8204060017 GUNANGE MALUKU UTARA 190 Phase 3 48 49 248 9.9 127.21954 0.02845 13895 5304112003 KOL OTO NUSA TENGGARA TIMUR 285 Phase 2 106 74 518 16.1 124.75210 -9.61991 13896 5315031005 GURUNG NUSA TENGGARA TIMUR 212 Phase 1 46 39 054 8.4 120.22307 -8.63436 13897 5307013004 LAMMA NUSA TENGGARA TIMUR 86 Phase 3 28 23 772 5.1 123.98148 -8.33828 13898 8107022002 KILMURY MALUKU 41 Phase 3 20 20 520 3.9 130.58087 -3.74074 13899 8206033003 TATAM MALUKU UTARA 485 Phase 3 149 152 874 30.8 128.40829 1.51926 13900 5306011004 WEBETUN NUSA TENGGARA TIMUR 244 Phase 2 53 37 259 8.0 124.75281 -9.60028 13901 5315031005 GURUNG NUSA TENGGARA TIMUR 226 Phase 1 49 41 601 9.0 120.22840 -8.63795 13902 5307013004 LAMMA NUSA TENGGARA TIMUR 169 Phase 3 54 45 846 9.9 124.00257 -8.33120 13903 8107022002 KILMURY MALUKU 66 Phase 3 32 32 832 6.2 130.57598 -3.72874 13904 8206033004 MARIMOI MALUKU UTARA 467 Phase 3 83 85 158 17.2 128.50322 1.53933 13905 5306011004 WEBETUN NUSA TENGGARA TIMUR 206 Phase 2 45 31 635 6.8 124.75822 -9.59241 13906 5315031004 ORONG NUSA TENGGARA TIMUR 389 Phase 1 80 67 920 14.7 120.23670 -8.64384 13907 5307013005 BEANG ONONG NUSA TENGGARA TIMUR 758 Phase 3 211 179 139 38.7 124.03136 -8.31143 13908 8106040007 MORNATEN MALUKU 303 Phase 3 60 61 560 11.6 128.27058 -2.86945 13909 8206033005 BOLOLO MALUKU UTARA 854 Phase 3 157 161 082 32.5 128.54117 1.54588 Annex II – Demand forecast results Page 46 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 13910 5306011015 WEAIN NUSA TENGGARA TIMUR 129 Phase 2 28 19 684 4.2 124.75679 -9.59053 13911 5315031004 ORONG NUSA TENGGARA TIMUR 124 Phase 1 26 22 074 4.8 120.23985 -8.64561 13912 5310052003 BLATATATIN NUSA TENGGARA TIMUR 127 Phase 3 33 28 017 6.0 122.28008 -8.69565 13913 8109020012 WAERAMAN MALUKU 364 Phase 3 78 80 028 15.1 126.47815 -3.51530 13914 8204083001 GONONE MALUKU UTARA 372 Phase 3 71 72 846 14.7 128.31549 -1.08910 13915 5306011015 WEAIN NUSA TENGGARA TIMUR 489 Phase 2 107 75 221 16.2 124.74726 -9.58978 13916 5315031002 PONG WELAK NUSA TENGGARA TIMUR 524 Phase 1 106 89 994 19.4 120.24283 -8.64348 13917 5310040015 TALIBURA NUSA TENGGARA TIMUR 281 Phase 3 71 60 279 13.0 122.54803 -8.52727 13918 8109020019 UNETH MALUKU 370 Phase 3 87 89 262 16.9 126.44077 -3.54627 13919 8204083002 PULAU GALA MALUKU UTARA 968 Phase 3 159 163 134 32.9 128.34095 -1.10482 13920 5306011012 NANIN NUSA TENGGARA TIMUR 335 Phase 2 77 54 131 11.7 124.76581 -9.58838 13921 5315031004 ORONG NUSA TENGGARA TIMUR 875 Phase 1 179 151 971 32.8 120.23778 -8.64930 13922 5309072004 PLEDO NUSA TENGGARA TIMUR 129 Phase 3 36 30 564 6.6 123.30933 -8.28580 13923 8103040006 PILIANA MALUKU 497 Phase 3 98 100 548 19.0 129.57238 -3.20352 13924 8204083003 TAWABI MALUKU UTARA 816 Phase 3 162 166 212 33.5 128.39565 -1.12904 13925 5306011012 NANIN NUSA TENGGARA TIMUR 102 Phase 2 24 16 872 3.6 124.77390 -9.59507 13926 5315031004 ORONG NUSA TENGGARA TIMUR 95 Phase 1 20 16 980 3.7 120.23519 -8.65208 13927 5309072008 WAIWURING NUSA TENGGARA TIMUR 104 Phase 3 32 27 168 5.9 123.30617 -8.29485 13928 8104021018 WAEKERTA MALUKU 90 Phase 3 24 24 624 4.7 126.91728 -3.36554 13929 8204022001 SUM MALUKU UTARA 1 522 Phase 3 314 322 164 64.9 128.11396 -1.56262 13930 5304112005 BENAHE NUSA TENGGARA TIMUR 100 Phase 2 26 18 278 3.9 124.76802 -9.59982 13931 5315031004 ORONG NUSA TENGGARA TIMUR 292 Phase 1 60 50 940 11.0 120.23540 -8.65452 13932 5309072008 WAIWURING NUSA TENGGARA TIMUR 271 Phase 3 82 69 618 15.0 123.30475 -8.29687 13933 8104021014 WAENETAT MALUKU 17 Phase 3 5 5 130 1.0 126.96943 -3.40889 13934 8204061004 FOFAO MALUKU UTARA 64 Phase 3 15 15 390 3.1 127.14660 -0.18171 13935 5304112001 LOTAS NUSA TENGGARA TIMUR 503 Phase 2 156 109 668 23.7 124.76583 -9.60155 13936 5315031004 ORONG NUSA TENGGARA TIMUR 247 Phase 1 51 43 299 9.3 120.23050 -8.65202 13937 5308050001 BELOBATANG NUSA TENGGARA TIMUR 317 Phase 3 84 71 316 15.4 123.36770 -8.44832 13938 8104030006 WAMLANA MALUKU 158 Phase 3 33 33 858 6.4 126.55308 -3.42081 13939 8204040015 SABATANG MALUKU UTARA 584 Phase 3 133 136 458 27.5 127.66099 -0.44102 13940 5304112005 BENAHE NUSA TENGGARA TIMUR 198 Phase 2 50 35 150 7.6 124.77805 -9.59768 13941 5315031004 ORONG NUSA TENGGARA TIMUR 97 Phase 1 20 16 980 3.7 120.22710 -8.65259 13942 5310040027 BAANG KOOR NUSA TENGGARA TIMUR 388 Phase 3 91 77 259 16.7 122.54087 -8.47302 13943 8104030006 WAMLANA MALUKU 70 Phase 3 15 15 390 2.9 126.54896 -3.39422 13944 8205021008 SANGAJI JAYA MALUKU UTARA 107 Phase 3 29 29 754 6.0 127.84167 1.36694 13945 5306011020 NAIUSU NUSA TENGGARA TIMUR 292 Phase 2 79 55 537 12.0 124.78277 -9.59733 13946 5315031001 GALANG NUSA TENGGARA TIMUR 581 Phase 1 116 98 484 21.2 120.21845 -8.65204 13947 5309020012 SINA HADIGALA NUSA TENGGARA TIMUR 461 Phase 3 69 58 581 12.6 122.87406 -8.17535 13948 8104030006 WAMLANA MALUKU 93 Phase 3 20 20 520 3.9 126.54633 -3.39306 13949 8205021008 SANGAJI JAYA MALUKU UTARA 172 Phase 3 46 47 196 9.5 127.86443 1.36499 13950 5304112005 BENAHE NUSA TENGGARA TIMUR 53 Phase 2 14 9 842 2.1 124.78062 -9.60189 13951 5315031001 GALANG NUSA TENGGARA TIMUR 249 Phase 1 50 42 450 9.2 120.21921 -8.65805 13952 5309020013 BANDONA NUSA TENGGARA TIMUR 606 Phase 3 145 123 105 26.6 122.85066 -8.16982 13953 8104030006 WAMLANA MALUKU 192 Phase 3 40 41 040 7.8 126.54789 -3.39070 13954 8207010005 KOLORAI MALUKU UTARA 370 Phase 3 100 102 600 20.7 128.21158 2.05522 13955 5304112004 OBAKI NUSA TENGGARA TIMUR 117 Phase 2 38 26 714 5.8 124.78308 -9.60303 13956 5315031001 GALANG NUSA TENGGARA TIMUR 360 Phase 1 72 61 128 13.2 120.21851 -8.65976 13957 5309032002 KAWALELO NUSA TENGGARA TIMUR 394 Phase 3 119 101 031 21.8 122.88769 -8.40249 13958 8104030006 WAMLANA MALUKU 57 Phase 3 12 12 312 2.3 126.54792 -3.38825 13959 8204060027 DOROLAMO MALUKU UTARA 120 Phase 3 47 48 222 9.7 127.16845 -0.01389 13960 5304112004 OBAKI NUSA TENGGARA TIMUR 178 Phase 2 57 40 071 8.6 124.78788 -9.60801 13961 5315031010 SEMANG NUSA TENGGARA TIMUR 598 Phase 1 125 106 125 22.9 120.21891 -8.57829 13962 5308030022 PALILOLON NUSA TENGGARA TIMUR 197 Phase 3 50 42 450 9.2 123.38785 -8.26525 13963 8104030006 WAMLANA MALUKU 15 Phase 3 4 4 104 0.8 126.55577 -3.38407 13964 8205021018 TAKIMO MALUKU UTARA 146 Phase 3 39 40 014 8.1 127.89106 1.37899 13965 5306011003 LOTAS NUSA TENGGARA TIMUR 88 Phase 2 23 16 169 3.5 124.79544 -9.60431 13966 5315031001 GALANG NUSA TENGGARA TIMUR 254 Phase 1 51 43 299 9.3 120.21144 -8.65487 13967 5308040011 LODOTODOKOWA NUSA TENGGARA TIMUR 54 Phase 3 16 13 584 2.9 123.64660 -8.34200 13968 8104030006 WAMLANA MALUKU 54 Phase 3 12 12 312 2.3 126.55534 -3.38334 13969 8204051001 KAKUPANG MALUKU UTARA 96 Phase 3 24 24 624 5.0 127.13620 -0.51450 13970 5306011003 LOTAS NUSA TENGGARA TIMUR 182 Phase 2 47 33 041 7.1 124.79147 -9.59941 13971 5315031001 GALANG NUSA TENGGARA TIMUR 204 Phase 1 41 34 809 7.5 120.21024 -8.65372 13972 5308040011 LODOTODOKOWA NUSA TENGGARA TIMUR 211 Phase 3 62 52 638 11.4 123.65392 -8.34896 13973 8104030006 WAMLANA MALUKU 184 Phase 3 38 38 988 7.4 126.58673 -3.38644 13974 8204051001 KAKUPANG MALUKU UTARA 240 Phase 3 58 59 508 12.0 127.14778 -0.52485 13975 5306011003 LOTAS NUSA TENGGARA TIMUR 80 Phase 2 21 14 763 3.2 124.79330 -9.58726 13976 5318040022 ALORAWE NUSA TENGGARA TIMUR 339 Phase 1 70 59 430 12.8 121.19660 -8.65720 13977 5307062001 PURA BARAT NUSA TENGGARA TIMUR 177 Phase 3 53 44 997 9.7 124.32143 -8.31052 13978 8103040001 SALAMAHU MALUKU 173 Phase 3 44 45 144 8.5 129.44485 -3.43078 13979 8203060027 UPTD BOBONG MALUKU UTARA 77 Phase 3 20 20 520 4.1 124.37087 -1.90114 13980 5306011020 NAIUSU NUSA TENGGARA TIMUR 81 Phase 2 22 15 466 3.3 124.79299 -9.58643 13981 5318040018 DHEREISA NUSA TENGGARA TIMUR 145 Phase 1 32 27 168 5.9 121.19419 -8.68051 13982 5309020014 BAHINGA NUSA TENGGARA TIMUR 234 Phase 3 56 47 544 10.3 122.83524 -8.18560 13983 8107040006 BULA MALUKU 71 Phase 3 11 11 286 2.1 130.51981 -3.12533 13984 8204040023 KAIREU MALUKU UTARA 206 Phase 3 54 55 404 11.2 127.67502 -0.48388 13985 5306020001 BARENE NUSA TENGGARA TIMUR 1 066 Phase 2 309 217 227 46.9 124.80878 -9.58263 13986 5318040018 DHEREISA NUSA TENGGARA TIMUR 604 Phase 1 131 111 219 24.0 121.19756 -8.68368 13987 5309020014 BAHINGA NUSA TENGGARA TIMUR 674 Phase 3 161 136 689 29.5 122.82526 -8.19049 13988 8104030006 WAMLANA MALUKU 74 Phase 3 16 16 416 3.1 126.51827 -3.40298 13989 8206020003 BINAGARA MALUKU UTARA 21 Phase 3 6 6 156 1.2 127.80638 0.75079 13990 5306011019 MUKE NUSA TENGGARA TIMUR 456 Phase 2 104 73 112 15.8 124.80472 -9.60358 13991 5318040019 GERODHERE NUSA TENGGARA TIMUR 252 Phase 1 57 48 393 10.4 121.18998 -8.70074 13992 5308010016 BELABAJA NUSA TENGGARA TIMUR 701 Phase 3 51 43 299 9.3 123.36566 -8.46445 13993 8104030006 WAMLANA MALUKU 91 Phase 3 19 19 494 3.7 126.50904 -3.40889 13994 8206020003 BINAGARA MALUKU UTARA 41 Phase 3 11 11 286 2.3 127.80554 0.74851 Annex II – Demand forecast results Page 47 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 13995 5306011006 NITI NUSA TENGGARA TIMUR 29 Phase 2 7 4 921 1.1 124.72329 -9.61384 13996 5318040019 GERODHERE NUSA TENGGARA TIMUR 781 Phase 1 175 148 575 32.1 121.18837 -8.70377 13997 5308010018 ILE BOLI NUSA TENGGARA TIMUR 440 Phase 3 100 84 900 18.3 123.34541 -8.46687 13998 8104030006 WAMLANA MALUKU 98 Phase 3 21 21 546 4.1 126.50351 -3.41276 13999 8206020003 BINAGARA MALUKU UTARA 5 Phase 3 2 2 052 0.4 127.80818 0.74978 14000 5306011017 TAFULI I NUSA TENGGARA TIMUR 103 Phase 2 29 20 387 4.4 124.72280 -9.61353 14001 5318020013 LADOLIMA TIMUR NUSA TENGGARA TIMUR 151 Phase 1 34 28 866 6.2 121.30567 -8.84675 14002 5308010021 BOLIBEAN NUSA TENGGARA TIMUR 298 Phase 3 71 60 279 13.0 123.33866 -8.45557 14003 8109020008 LEKSULA MALUKU 106 Phase 3 22 22 572 4.3 126.56755 -3.72857 14004 8272041003 HAGER MALUKU UTARA 7 Phase 3 2 2 052 0.4 127.70033 0.12036 14005 5306011017 TAFULI I NUSA TENGGARA TIMUR 51 Phase 2 14 9 842 2.1 124.71518 -9.60701 14006 5315040024 WAE BUKA NUSA TENGGARA TIMUR 534 Phase 1 121 102 729 22.2 120.32725 -8.48892 14007 5310040017 DARAT PANTAI NUSA TENGGARA TIMUR 160 Phase 3 46 39 054 8.4 122.51622 -8.46844 14008 8103052007 WARAKA MALUKU 173 Phase 3 39 40 014 7.6 128.91915 -3.15823 14009 5306011017 TAFULI I NUSA TENGGARA TIMUR 485 Phase 2 134 94 202 20.3 124.71243 -9.60884 14010 5315030007 MUNTING NUSA TENGGARA TIMUR 84 Phase 1 20 16 980 3.7 120.22776 -8.73043 14011 5310040017 DARAT PANTAI NUSA TENGGARA TIMUR 219 Phase 3 62 52 638 11.4 122.48435 -8.48910 14012 8107022002 KILMURY MALUKU 18 Phase 3 9 9 234 1.7 130.57075 -3.72244 14013 5304040011 PUSU NUSA TENGGARA TIMUR 700 Phase 2 176 123 728 26.7 124.32101 -9.89608 14014 5315030007 MUNTING NUSA TENGGARA TIMUR 614 Phase 1 141 119 709 25.8 120.23323 -8.73618 14015 5310040017 DARAT PANTAI NUSA TENGGARA TIMUR 204 Phase 3 58 49 242 10.6 122.48316 -8.48953 14016 8104021013 WAEGEREN MALUKU 30 Phase 3 8 8 208 1.6 126.92656 -3.41502 14017 5305023002 KUANEK NUSA TENGGARA TIMUR 88 Phase 2 29 20 387 4.4 124.41010 -9.46372 14018 5318060023 AERAMO NUSA TENGGARA TIMUR 484 Phase 1 87 73 863 15.9 121.32901 -8.56837 14019 5310040017 DARAT PANTAI NUSA TENGGARA TIMUR 234 Phase 3 67 56 883 12.3 122.48332 -8.49312 14020 8104021016 UPT WABLOY MALUKU 10 Phase 3 3 3 078 0.6 126.92518 -3.38386 14021 5305023006 OENINO NUSA TENGGARA TIMUR 27 Phase 2 8 5 624 1.2 124.41382 -9.46225 14022 5313120013 MELER NUSA TENGGARA TIMUR 321 Phase 1 73 61 977 13.4 120.37084 -8.56812 14023 5310040017 DARAT PANTAI NUSA TENGGARA TIMUR 355 Phase 3 101 85 749 18.5 122.48394 -8.49820 14024 8104021016 UPT WABLOY MALUKU 15 Phase 3 4 4 104 0.8 126.93560 -3.38914 14025 5305023002 KUANEK NUSA TENGGARA TIMUR 133 Phase 2 43 30 229 6.5 124.41392 -9.46194 14026 5315031006 LALE NUSA TENGGARA TIMUR 135 Phase 1 30 25 470 5.5 120.20136 -8.64702 14027 5310040017 DARAT PANTAI NUSA TENGGARA TIMUR 145 Phase 3 41 34 809 7.5 122.48471 -8.49953 14028 8104021013 WAEGEREN MALUKU 7 Phase 3 2 2 052 0.4 126.90188 -3.39493 14029 5305023002 KUANEK NUSA TENGGARA TIMUR 315 Phase 2 101 71 003 15.3 124.41438 -9.45928 14030 5315031006 LALE NUSA TENGGARA TIMUR 263 Phase 1 58 49 242 10.6 120.20041 -8.64531 14031 5310082017 PARUMAAN NUSA TENGGARA TIMUR 243 Phase 3 69 58 581 12.6 122.45766 -8.47700 14032 5305023006 OENINO NUSA TENGGARA TIMUR 520 Phase 2 150 105 450 22.8 124.41956 -9.46441 14033 5315031006 LALE NUSA TENGGARA TIMUR 255 Phase 1 57 48 393 10.4 120.18909 -8.63956 14034 5310082017 PARUMAAN NUSA TENGGARA TIMUR 197 Phase 3 56 47 544 10.3 122.43503 -8.47557 14035 5315031006 LALE NUSA TENGGARA TIMUR 513 Phase 1 113 95 937 20.7 120.17463 -8.63247 14036 5304061007 NUNUSUNU NUSA TENGGARA TIMUR 754 Phase 2 174 122 322 26.4 124.41078 -10.09481 14037 5310082017 PARUMAAN NUSA TENGGARA TIMUR 1 312 Phase 3 369 313 281 67.6 122.44253 -8.45520 14038 5315031006 LALE NUSA TENGGARA TIMUR 144 Phase 1 32 27 168 5.9 120.17569 -8.61642 14039 5305023001 NIMASI NUSA TENGGARA TIMUR 5 Phase 2 2 1 406 0.3 124.41982 -9.46413 14040 5308040011 LODOTODOKOWA NUSA TENGGARA TIMUR 44 Phase 3 13 11 037 2.4 123.65562 -8.35262 14041 5315031008 WATU UMPU NUSA TENGGARA TIMUR 594 Phase 1 150 127 350 27.5 120.17943 -8.61367 14042 5305023006 OENINO NUSA TENGGARA TIMUR 18 Phase 2 6 4 218 0.9 124.42483 -9.46219 14043 5308040012 SERANGGORANG NUSA TENGGARA TIMUR 35 Phase 3 10 8 490 1.8 123.65636 -8.35338 14044 5313130001 BERE NUSA TENGGARA TIMUR 265 Phase 1 61 51 789 11.2 120.45851 -8.53077 14045 5305023001 NIMASI NUSA TENGGARA TIMUR 9 Phase 2 3 2 109 0.5 124.43764 -9.46014 14046 5308040012 SERANGGORANG NUSA TENGGARA TIMUR 311 Phase 3 84 71 316 15.4 123.66402 -8.35138 14047 5318020007 LADOLIMA NUSA TENGGARA TIMUR 35 Phase 1 9 7 641 1.6 121.30678 -8.84465 14048 5305023006 OENINO NUSA TENGGARA TIMUR 18 Phase 2 6 4 218 0.9 124.43769 -9.46028 14049 5308060020 WOWONG NUSA TENGGARA TIMUR 196 Phase 3 97 82 353 17.8 123.69687 -8.33282 14050 5318020013 LADOLIMA TIMUR NUSA TENGGARA TIMUR 134 Phase 1 31 26 319 5.7 121.30736 -8.84487 14051 5305023008 OENENU SELATAN NUSA TENGGARA TIMUR 471 Phase 2 139 97 717 21.1 124.44536 -9.45108 14052 5308060002 LEUBATANG NUSA TENGGARA TIMUR 55 Phase 3 17 14 433 3.1 123.71764 -8.33388 14053 5318020013 LADOLIMA TIMUR NUSA TENGGARA TIMUR 686 Phase 1 155 131 595 28.4 121.30923 -8.84813 14054 5305030007 BANSONE NUSA TENGGARA TIMUR 673 Phase 2 147 103 341 22.3 124.45454 -9.45641 14055 5308060002 LEUBATANG NUSA TENGGARA TIMUR 196 Phase 3 61 51 789 11.2 123.71849 -8.33598 14056 5311060018 KELIWUMBU NUSA TENGGARA TIMUR 376 Phase 1 84 71 316 15.4 121.71512 -8.50138 14057 5305023008 OENENU SELATAN NUSA TENGGARA TIMUR 330 Phase 2 97 68 191 14.7 124.45284 -9.44250 14058 5308060002 LEUBATANG NUSA TENGGARA TIMUR 546 Phase 3 141 119 709 25.8 123.72350 -8.32727 14059 5311060018 KELIWUMBU NUSA TENGGARA TIMUR 71 Phase 1 16 13 584 2.9 121.72482 -8.49825 14060 5305030007 BANSONE NUSA TENGGARA TIMUR 157 Phase 2 35 24 605 5.3 124.45532 -9.44401 14061 5308010017 LABALIMUT NUSA TENGGARA TIMUR 670 Phase 3 24 20 376 4.4 123.35811 -8.48368 14062 5310061002 LIDI NUSA TENGGARA TIMUR 69 Phase 1 18 15 282 3.3 121.73403 -8.34695 14063 5305023005 OENENU NUSA TENGGARA TIMUR 111 Phase 2 33 23 199 5.0 124.44283 -9.43792 14064 5308010007 ATAWAI NUSA TENGGARA TIMUR 570 Phase 3 42 35 658 7.7 123.33351 -8.49437 14065 5310061002 LIDI NUSA TENGGARA TIMUR 136 Phase 1 36 30 564 6.6 121.73523 -8.34661 14066 5305023007 OENENU UTARA NUSA TENGGARA TIMUR 144 Phase 2 36 25 308 5.5 124.44210 -9.43847 14067 5308010020 TEWAOWUTUNG NUSA TENGGARA TIMUR 304 Phase 3 84 71 316 15.4 123.31584 -8.52393 14068 5310061002 LIDI NUSA TENGGARA TIMUR 110 Phase 1 29 24 621 5.3 121.73993 -8.34258 14069 5305023007 OENENU UTARA NUSA TENGGARA TIMUR 48 Phase 2 12 8 436 1.8 124.44418 -9.43266 14070 5308010006 PENIKENE NUSA TENGGARA TIMUR 726 Phase 3 209 177 441 38.3 123.32179 -8.52710 14071 5310061002 LIDI NUSA TENGGARA TIMUR 130 Phase 1 34 28 866 6.2 121.74089 -8.34000 14072 5305023007 OENENU UTARA NUSA TENGGARA TIMUR 269 Phase 2 67 47 101 10.2 124.44397 -9.43087 14073 5308010002 LOLONG NUSA TENGGARA TIMUR 241 Phase 3 64 54 336 11.7 123.30234 -8.53515 14074 5310061002 LIDI NUSA TENGGARA TIMUR 70 Phase 1 19 16 131 3.5 121.73633 -8.33247 14075 5305023007 OENENU UTARA NUSA TENGGARA TIMUR 167 Phase 2 42 29 526 6.4 124.44584 -9.43135 14076 5308010001 PASIR PUTIH NUSA TENGGARA TIMUR 509 Phase 3 155 131 595 28.4 123.28466 -8.54363 14077 5310061002 LIDI NUSA TENGGARA TIMUR 272 Phase 1 71 60 279 13.0 121.73510 -8.32939 14078 5305023007 OENENU UTARA NUSA TENGGARA TIMUR 173 Phase 2 43 30 229 6.5 124.44755 -9.43101 14079 5309021001 LEWOBELE NUSA TENGGARA TIMUR 359 Phase 3 90 76 410 16.5 122.84514 -8.29465 Annex II – Demand forecast results Page 48 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 14080 5310061005 KESOKOJA NUSA TENGGARA TIMUR 102 Phase 1 28 23 772 5.1 121.73426 -8.32877 14081 5305023005 OENENU NUSA TENGGARA TIMUR 513 Phase 2 150 105 450 22.8 124.44783 -9.43148 14082 5307060023 ALILA NUSA TENGGARA TIMUR 205 Phase 3 64 54 336 11.7 124.46604 -8.14981 14083 5310061005 KESOKOJA NUSA TENGGARA TIMUR 21 Phase 1 6 5 094 1.1 121.73258 -8.32946 14084 5306011002 WEKMIDAR NUSA TENGGARA TIMUR 625 Phase 2 150 105 450 22.8 124.81220 -9.60781 14085 5308030021 KOLIPADAN NUSA TENGGARA TIMUR 183 Phase 3 46 39 054 8.4 123.37652 -8.27802 14086 5310061002 LIDI NUSA TENGGARA TIMUR 96 Phase 1 25 21 225 4.6 121.73198 -8.32989 14087 5304102008 PUTUN NUSA TENGGARA TIMUR 106 Phase 2 39 27 417 5.9 124.65440 -9.87201 14088 5308030021 KOLIPADAN NUSA TENGGARA TIMUR 202 Phase 3 51 43 299 9.3 123.37082 -8.27493 14089 5310061005 KESOKOJA NUSA TENGGARA TIMUR 85 Phase 1 23 19 527 4.2 121.72817 -8.31905 14090 5305012002 OETULU NUSA TENGGARA TIMUR 218 Phase 2 63 44 289 9.6 124.36814 -9.48939 14091 5308030021 KOLIPADAN NUSA TENGGARA TIMUR 448 Phase 3 113 95 937 20.7 123.35841 -8.29839 14092 5310061005 KESOKOJA NUSA TENGGARA TIMUR 98 Phase 1 26 22 074 4.8 121.72852 -8.31571 14093 5305012004 OEOLO NUSA TENGGARA TIMUR 102 Phase 2 33 23 199 5.0 124.36220 -9.48365 14094 5309071004 BUNGALAWAN NUSA TENGGARA TIMUR 95 Phase 3 27 22 923 4.9 123.24754 -8.36792 14095 5310061005 KESOKOJA NUSA TENGGARA TIMUR 82 Phase 1 22 18 678 4.0 121.72709 -8.31376 14096 5305024003 HAUMENI 'ANA NUSA TENGGARA TIMUR 140 Phase 2 41 28 823 6.2 124.35647 -9.48521 14097 5309071018 DOKENG NUSA TENGGARA TIMUR 240 Phase 3 62 52 638 11.4 123.24670 -8.35488 14098 5310061005 KESOKOJA NUSA TENGGARA TIMUR 47 Phase 1 13 11 037 2.4 121.72648 -8.31112 14099 5305024003 HAUMENI 'ANA NUSA TENGGARA TIMUR 378 Phase 2 109 76 627 16.5 124.34997 -9.48653 14100 5310042024 ILINMEDO NUSA TENGGARA TIMUR 130 Phase 3 33 28 017 6.0 122.57602 -8.55358 14101 5310061005 KESOKOJA NUSA TENGGARA TIMUR 226 Phase 1 60 50 940 11.0 121.72778 -8.30983 14102 5305024003 HAUMENI 'ANA NUSA TENGGARA TIMUR 66 Phase 2 19 13 357 2.9 124.34007 -9.49498 14103 5310042024 ILINMEDO NUSA TENGGARA TIMUR 263 Phase 3 67 56 883 12.3 122.56803 -8.54931 14104 5310061005 KESOKOJA NUSA TENGGARA TIMUR 109 Phase 1 29 24 621 5.3 121.72578 -8.30806 14105 5305024003 HAUMENI 'ANA NUSA TENGGARA TIMUR 357 Phase 2 103 72 409 15.6 124.33505 -9.49860 14106 5310042024 ILINMEDO NUSA TENGGARA TIMUR 138 Phase 3 35 29 715 6.4 122.56715 -8.55680 14107 5310061005 KESOKOJA NUSA TENGGARA TIMUR 97 Phase 1 26 22 074 4.8 121.72143 -8.30632 14108 5305024001 NILULAT NUSA TENGGARA TIMUR 80 Phase 2 26 18 278 3.9 124.33320 -9.49955 14109 5307020018 PROBUR NUSA TENGGARA TIMUR 192 Phase 3 40 33 960 7.3 124.41805 -8.39425 14110 5310061005 KESOKOJA NUSA TENGGARA TIMUR 141 Phase 1 38 32 262 7.0 121.72212 -8.30505 14111 5305024001 NILULAT NUSA TENGGARA TIMUR 111 Phase 2 36 25 308 5.5 124.33340 -9.50069 14112 5307020001 HALERMAN NUSA TENGGARA TIMUR 74 Phase 3 15 12 735 2.7 124.41908 -8.40170 14113 5310061004 MALURIWU NUSA TENGGARA TIMUR 127 Phase 1 35 29 715 6.4 121.72117 -8.30422 14114 5305024001 NILULAT NUSA TENGGARA TIMUR 49 Phase 2 16 11 248 2.4 124.32974 -9.49950 14115 5307020001 HALERMAN NUSA TENGGARA TIMUR 191 Phase 3 39 33 111 7.1 124.41762 -8.40999 14116 5310061004 MALURIWU NUSA TENGGARA TIMUR 89 Phase 1 25 21 225 4.6 121.72014 -8.30022 14117 5305024001 NILULAT NUSA TENGGARA TIMUR 155 Phase 2 49 34 447 7.4 124.32942 -9.50087 14118 5307020001 HALERMAN NUSA TENGGARA TIMUR 19 Phase 3 4 3 396 0.7 124.41572 -8.41359 14119 5310061004 MALURIWU NUSA TENGGARA TIMUR 397 Phase 1 108 91 692 19.8 121.72413 -8.29765 14120 5305024001 NILULAT NUSA TENGGARA TIMUR 69 Phase 2 22 15 466 3.3 124.32623 -9.50363 14121 5307020001 HALERMAN NUSA TENGGARA TIMUR 94 Phase 3 19 16 131 3.5 124.41714 -8.41501 14122 5310061004 MALURIWU NUSA TENGGARA TIMUR 2 Phase 1 1 849 0.2 121.72649 -8.29817 14123 5305024002 TUBU NUSA TENGGARA TIMUR 135 Phase 2 45 31 635 6.8 124.31877 -9.50324 14124 5307020001 HALERMAN NUSA TENGGARA TIMUR 65 Phase 3 13 11 037 2.4 124.41479 -8.42785 14125 5310061003 RERUWAIRERE NUSA TENGGARA TIMUR 27 Phase 1 9 7 641 1.6 121.72691 -8.29819 14126 5305024002 TUBU NUSA TENGGARA TIMUR 279 Phase 2 92 64 676 14.0 124.31445 -9.50263 14127 5307020001 HALERMAN NUSA TENGGARA TIMUR 54 Phase 3 11 9 339 2.0 124.41507 -8.43587 14128 5310061003 RERUWAIRERE NUSA TENGGARA TIMUR 134 Phase 1 41 34 809 7.5 121.72725 -8.30036 14129 5305024002 TUBU NUSA TENGGARA TIMUR 100 Phase 2 33 23 199 5.0 124.31087 -9.50236 14130 5307020002 MARGETA NUSA TENGGARA TIMUR 170 Phase 3 39 33 111 7.1 124.42416 -8.44015 14131 5310061003 RERUWAIRERE NUSA TENGGARA TIMUR 98 Phase 1 30 25 470 5.5 121.72849 -8.30268 14132 5305010022 MANUSASI NUSA TENGGARA TIMUR 104 Phase 2 29 20 387 4.4 124.29913 -9.51254 14133 5307020002 MARGETA NUSA TENGGARA TIMUR 200 Phase 3 46 39 054 8.4 124.43612 -8.43977 14134 5310061003 RERUWAIRERE NUSA TENGGARA TIMUR 455 Phase 1 139 118 011 25.5 121.73120 -8.30187 14135 5305010022 MANUSASI NUSA TENGGARA TIMUR 258 Phase 2 71 49 913 10.8 124.29583 -9.50947 14136 5307020002 MARGETA NUSA TENGGARA TIMUR 83 Phase 3 19 16 131 3.5 124.43870 -8.43880 14137 5310061003 RERUWAIRERE NUSA TENGGARA TIMUR 66 Phase 1 21 17 829 3.8 121.72790 -8.29786 14138 5305010022 MANUSASI NUSA TENGGARA TIMUR 565 Phase 2 156 109 668 23.7 124.29160 -9.50924 14139 5307020002 MARGETA NUSA TENGGARA TIMUR 11 Phase 3 3 2 547 0.5 124.44821 -8.44436 14140 5310061003 RERUWAIRERE NUSA TENGGARA TIMUR 147 Phase 1 45 38 205 8.2 121.72993 -8.29906 14141 5306040003 LAKEKUN UTARA NUSA TENGGARA TIMUR 941 Phase 2 196 137 788 29.7 124.95970 -9.49630 14142 5307020003 MANATANG NUSA TENGGARA TIMUR 17 Phase 3 4 3 396 0.7 124.44900 -8.44409 14143 5310061004 MALURIWU NUSA TENGGARA TIMUR 63 Phase 1 18 15 282 3.3 121.71882 -8.29800 14144 5306040003 LAKEKUN UTARA NUSA TENGGARA TIMUR 343 Phase 2 72 50 616 10.9 124.95823 -9.49367 14145 5307020003 MANATANG NUSA TENGGARA TIMUR 28 Phase 3 7 5 943 1.3 124.45116 -8.44378 14146 5310061004 MALURIWU NUSA TENGGARA TIMUR 179 Phase 1 49 41 601 9.0 121.71697 -8.29776 14147 5306040003 LAKEKUN UTARA NUSA TENGGARA TIMUR 385 Phase 2 80 56 240 12.1 124.96269 -9.49188 14148 5307020003 MANATANG NUSA TENGGARA TIMUR 101 Phase 3 24 20 376 4.4 124.45372 -8.44098 14149 5310061004 MALURIWU NUSA TENGGARA TIMUR 82 Phase 1 23 19 527 4.2 121.71612 -8.29674 14150 5304060008 KAKAN NUSA TENGGARA TIMUR 80 Phase 2 19 13 357 2.9 124.46997 -10.00009 14151 5307020003 MANATANG NUSA TENGGARA TIMUR 160 Phase 3 38 32 262 7.0 124.45772 -8.43925 14152 5310061004 MALURIWU NUSA TENGGARA TIMUR 30 Phase 1 9 7 641 1.6 121.71493 -8.29647 14153 5304040011 PUSU NUSA TENGGARA TIMUR 25 Phase 2 7 4 921 1.1 124.32277 -9.89921 14154 5307020003 MANATANG NUSA TENGGARA TIMUR 60 Phase 3 15 12 735 2.7 124.46346 -8.43757 14155 5310061004 MALURIWU NUSA TENGGARA TIMUR 68 Phase 1 19 16 131 3.5 121.71417 -8.29888 14156 5304040011 PUSU NUSA TENGGARA TIMUR 42 Phase 2 11 7 733 1.7 124.32523 -9.90017 14157 5307020003 MANATANG NUSA TENGGARA TIMUR 25 Phase 3 6 5 094 1.1 124.46565 -8.43657 14158 5310061005 KESOKOJA NUSA TENGGARA TIMUR 7 Phase 1 2 1 698 0.4 121.71339 -8.30017 14159 5304040011 PUSU NUSA TENGGARA TIMUR 57 Phase 2 15 10 545 2.3 124.32863 -9.90021 14160 5307020003 MANATANG NUSA TENGGARA TIMUR 221 Phase 3 52 44 148 9.5 124.46895 -8.43391 14161 5310061006 LADOLAKA NUSA TENGGARA TIMUR 244 Phase 1 65 55 185 11.9 121.71271 -8.30023 14162 5304040011 PUSU NUSA TENGGARA TIMUR 33 Phase 2 9 6 327 1.4 124.32894 -9.90618 14163 5307020004 TRIBUR NUSA TENGGARA TIMUR 106 Phase 3 21 17 829 3.8 124.48704 -8.42017 14164 5310061006 LADOLAKA NUSA TENGGARA TIMUR 114 Phase 1 30 25 470 5.5 121.70890 -8.30311 Annex II – Demand forecast results Page 49 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 14165 5304040011 PUSU NUSA TENGGARA TIMUR 29 Phase 2 8 5 624 1.2 124.32884 -9.91061 14166 5307020004 TRIBUR NUSA TENGGARA TIMUR 60 Phase 3 12 10 188 2.2 124.48773 -8.41815 14167 5310061006 LADOLAKA NUSA TENGGARA TIMUR 164 Phase 1 44 37 356 8.1 121.70855 -8.30471 14168 5304040011 PUSU NUSA TENGGARA TIMUR 1 299 Phase 2 326 229 178 49.4 124.32549 -9.91511 14169 5307020004 TRIBUR NUSA TENGGARA TIMUR 29 Phase 3 6 5 094 1.1 124.48938 -8.42194 14170 5310061006 LADOLAKA NUSA TENGGARA TIMUR 14 Phase 1 4 3 396 0.7 121.70791 -8.30898 14171 5304060008 KAKAN NUSA TENGGARA TIMUR 781 Phase 2 180 126 540 27.3 124.46267 -10.00931 14172 5307020004 TRIBUR NUSA TENGGARA TIMUR 183 Phase 3 36 30 564 6.6 124.49096 -8.42035 14173 5310061007 TUANGGEO NUSA TENGGARA TIMUR 751 Phase 1 242 205 458 44.3 121.70600 -8.31019 14174 5304091005 NUALUNAT NUSA TENGGARA TIMUR 982 Phase 2 243 170 829 36.9 124.63316 -9.94800 14175 5307020004 TRIBUR NUSA TENGGARA TIMUR 25 Phase 3 5 4 245 0.9 124.49336 -8.41882 14176 5310061006 LADOLAKA NUSA TENGGARA TIMUR 77 Phase 1 21 17 829 3.8 121.70546 -8.30386 14177 5304091005 NUALUNAT NUSA TENGGARA TIMUR 186 Phase 2 46 32 338 7.0 124.63117 -9.95244 14178 5307020004 TRIBUR NUSA TENGGARA TIMUR 209 Phase 3 41 34 809 7.5 124.49245 -8.41699 14179 5310061006 LADOLAKA NUSA TENGGARA TIMUR 292 Phase 1 77 65 373 14.1 121.70634 -8.30119 14180 5304060004 KUSI NUSA TENGGARA TIMUR 226 Phase 2 53 37 259 8.0 124.46790 -10.01382 14181 5307020004 TRIBUR NUSA TENGGARA TIMUR 413 Phase 3 81 68 769 14.8 124.49661 -8.41694 14182 5310061006 LADOLAKA NUSA TENGGARA TIMUR 75 Phase 1 20 16 980 3.7 121.70294 -8.30172 14183 5304060004 KUSI NUSA TENGGARA TIMUR 109 Phase 2 26 18 278 3.9 124.47068 -10.01467 14184 5307020004 TRIBUR NUSA TENGGARA TIMUR 25 Phase 3 5 4 245 0.9 124.49780 -8.41262 14185 5310061006 LADOLAKA NUSA TENGGARA TIMUR 97 Phase 1 26 22 074 4.8 121.70178 -8.30084 14186 5314070004 BOA NUSA TENGGARA TIMUR 688 Phase 2 158 111 074 24.0 122.86908 -10.90601 14187 5307020004 TRIBUR NUSA TENGGARA TIMUR 67 Phase 3 14 11 886 2.6 124.49761 -8.40958 14188 5310061007 TUANGGEO NUSA TENGGARA TIMUR 3 Phase 1 1 849 0.2 121.70134 -8.30083 14189 5314010005 OESELI NUSA TENGGARA TIMUR 1 505 Phase 2 375 263 625 56.9 122.88737 -10.93787 14190 5307020004 TRIBUR NUSA TENGGARA TIMUR 619 Phase 3 121 102 729 22.2 124.49461 -8.40987 14191 5310061007 TUANGGEO NUSA TENGGARA TIMUR 92 Phase 1 30 25 470 5.5 121.69744 -8.30395 14192 5306041003 ALAS NUSA TENGGARA TIMUR 43 Phase 2 13 9 139 2.0 125.04992 -9.38706 14193 5307020004 TRIBUR NUSA TENGGARA TIMUR 139 Phase 3 28 23 772 5.1 124.49930 -8.40243 14194 5310061008 ROKIROLE NUSA TENGGARA TIMUR 309 Phase 1 89 75 561 16.3 121.69471 -8.30936 14195 5306041003 ALAS NUSA TENGGARA TIMUR 73 Phase 2 21 14 763 3.2 125.05176 -9.38739 14196 5307020004 TRIBUR NUSA TENGGARA TIMUR 21 Phase 3 5 4 245 0.9 124.50015 -8.40248 14197 5310061008 ROKIROLE NUSA TENGGARA TIMUR 617 Phase 1 177 150 273 32.4 121.69923 -8.31141 14198 5305011004 NOENASI NUSA TENGGARA TIMUR 419 Phase 2 136 95 608 20.6 124.42488 -9.50732 14199 5307020004 TRIBUR NUSA TENGGARA TIMUR 147 Phase 3 29 24 621 5.3 124.50532 -8.39083 14200 5310061005 KESOKOJA NUSA TENGGARA TIMUR 139 Phase 1 37 31 413 6.8 121.72990 -8.30778 14201 5306022001 KEREANA NUSA TENGGARA TIMUR 412 Phase 2 132 92 796 20.0 124.91636 -9.48409 14202 5307020005 KUIFANA NUSA TENGGARA TIMUR 16 Phase 3 4 3 396 0.7 124.50611 -8.39061 14203 5310061002 LIDI NUSA TENGGARA TIMUR 263 Phase 1 68 57 732 12.5 121.73907 -8.32930 14204 5306032006 RAFAE NUSA TENGGARA TIMUR 318 Phase 2 64 44 992 9.7 124.85563 -9.33449 14205 5307020017 ORGEN NUSA TENGGARA TIMUR 105 Phase 3 30 25 470 5.5 124.50402 -8.37230 14206 5310061008 ROKIROLE NUSA TENGGARA TIMUR 337 Phase 1 97 82 353 17.8 121.69166 -8.31715 14207 5306032001 TASAIN NUSA TENGGARA TIMUR 421 Phase 2 112 78 736 17.0 124.85572 -9.34357 14208 5307020017 ORGEN NUSA TENGGARA TIMUR 133 Phase 3 38 32 262 7.0 124.49882 -8.36684 14209 5310061001 NITUNGLEA NUSA TENGGARA TIMUR 666 Phase 1 192 163 008 35.2 121.68782 -8.32239 14210 5306011013 ALALA NUSA TENGGARA TIMUR 226 Phase 2 55 38 665 8.3 124.77125 -9.58109 14211 5307020017 ORGEN NUSA TENGGARA TIMUR 294 Phase 3 83 70 467 15.2 124.49508 -8.36393 14212 5310061003 RERUWAIRERE NUSA TENGGARA TIMUR 42 Phase 1 13 11 037 2.4 121.72692 -8.29690 14213 5306011012 NANIN NUSA TENGGARA TIMUR 224 Phase 2 52 36 556 7.9 124.77588 -9.58398 14214 5307020017 ORGEN NUSA TENGGARA TIMUR 169 Phase 3 48 40 752 8.8 124.50894 -8.36743 14215 5310061007 TUANGGEO NUSA TENGGARA TIMUR 114 Phase 1 37 31 413 6.8 121.70227 -8.30599 14216 5306011013 ALALA NUSA TENGGARA TIMUR 201 Phase 2 49 34 447 7.4 124.77632 -9.57900 14217 5307020016 PINTU MAS NUSA TENGGARA TIMUR 406 Phase 3 75 63 675 13.7 124.51211 -8.32995 14218 5310061002 LIDI NUSA TENGGARA TIMUR 121 Phase 1 32 27 168 5.9 121.74296 -8.32874 14219 5304060005 KUANFATU NUSA TENGGARA TIMUR 324 Phase 2 75 52 725 11.4 124.46002 -10.01563 14220 5307020016 PINTU MAS NUSA TENGGARA TIMUR 552 Phase 3 101 85 749 18.5 124.52010 -8.33065 14221 5310061002 LIDI NUSA TENGGARA TIMUR 98 Phase 1 26 22 074 4.8 121.74457 -8.32674 14222 5304040011 PUSU NUSA TENGGARA TIMUR 117 Phase 2 30 21 090 4.6 124.32307 -9.91820 14223 5307020016 PINTU MAS NUSA TENGGARA TIMUR 420 Phase 3 77 65 373 14.1 124.51975 -8.32284 14224 5310061003 RERUWAIRERE NUSA TENGGARA TIMUR 35 Phase 1 11 9 339 2.0 121.74467 -8.32609 14225 5304040011 PUSU NUSA TENGGARA TIMUR 48 Phase 2 13 9 139 2.0 124.31790 -9.91740 14226 5307020016 PINTU MAS NUSA TENGGARA TIMUR 57 Phase 3 11 9 339 2.0 124.51991 -8.31702 14227 5310061003 RERUWAIRERE NUSA TENGGARA TIMUR 45 Phase 1 14 11 886 2.6 121.72916 -8.29674 14228 5304051002 TEAS NUSA TENGGARA TIMUR 66 Phase 2 18 12 654 2.7 124.31395 -9.91970 14229 5307020016 PINTU MAS NUSA TENGGARA TIMUR 121 Phase 3 23 19 527 4.2 124.51857 -8.31566 14230 5310061001 NITUNGLEA NUSA TENGGARA TIMUR 106 Phase 1 31 26 319 5.7 121.68366 -8.32188 14231 5304051002 TEAS NUSA TENGGARA TIMUR 42 Phase 2 11 7 733 1.7 124.31576 -9.92201 14232 5307020015 KAFELULANG NUSA TENGGARA TIMUR 116 Phase 3 23 19 527 4.2 124.53929 -8.31755 14233 5310061001 NITUNGLEA NUSA TENGGARA TIMUR 97 Phase 1 28 23 772 5.1 121.68410 -8.32880 14234 5304051002 TEAS NUSA TENGGARA TIMUR 46 Phase 2 12 8 436 1.8 124.31743 -9.92437 14235 5307020015 KAFELULANG NUSA TENGGARA TIMUR 743 Phase 3 141 119 709 25.8 124.54097 -8.31902 14236 5310061001 NITUNGLEA NUSA TENGGARA TIMUR 242 Phase 1 70 59 430 12.8 121.68875 -8.33145 14237 5304051002 TEAS NUSA TENGGARA TIMUR 115 Phase 2 30 21 090 4.6 124.31864 -9.92814 14238 5307020016 PINTU MAS NUSA TENGGARA TIMUR 253 Phase 3 47 39 903 8.6 124.53861 -8.30944 14239 5310061001 NITUNGLEA NUSA TENGGARA TIMUR 117 Phase 1 34 28 866 6.2 121.68335 -8.33320 14240 5304051002 TEAS NUSA TENGGARA TIMUR 13 Phase 2 4 2 812 0.6 124.31754 -9.93062 14241 5308060005 MAHAL NUSA TENGGARA TIMUR 772 Phase 3 125 106 125 22.9 123.76462 -8.28758 14242 5310061001 NITUNGLEA NUSA TENGGARA TIMUR 66 Phase 1 19 16 131 3.5 121.68451 -8.33675 14243 5304051002 TEAS NUSA TENGGARA TIMUR 80 Phase 2 21 14 763 3.2 124.31992 -9.93592 14244 5307012006 KAERA NUSA TENGGARA TIMUR 516 Phase 3 127 107 823 23.3 124.26787 -8.29783 14245 5310061001 NITUNGLEA NUSA TENGGARA TIMUR 128 Phase 1 37 31 413 6.8 121.68248 -8.33743 14246 5304051002 TEAS NUSA TENGGARA TIMUR 527 Phase 2 137 96 311 20.8 124.31650 -9.93981 14247 5309010004 WAIULA NUSA TENGGARA TIMUR 28 Phase 3 6 5 094 1.1 122.72236 -8.62444 14248 5310061004 MALURIWU NUSA TENGGARA TIMUR 31 Phase 1 9 7 641 1.6 121.72615 -8.30073 14249 5304051002 TEAS NUSA TENGGARA TIMUR 12 Phase 2 4 2 812 0.6 124.31338 -9.94514 Annex II – Demand forecast results Page 50 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 14250 5309010003 PANTAI OA NUSA TENGGARA TIMUR 184 Phase 3 43 36 507 7.9 122.72085 -8.62435 14251 5318020004 KOTAWUJI BARAT NUSA TENGGARA TIMUR 437 Phase 1 110 93 390 20.2 121.28632 -8.86683 14252 5304051002 TEAS NUSA TENGGARA TIMUR 54 Phase 2 14 9 842 2.1 124.31132 -9.94763 14253 5309010003 PANTAI OA NUSA TENGGARA TIMUR 292 Phase 3 67 56 883 12.3 122.72076 -8.62551 14254 5315040019 GOLO LEWE NUSA TENGGARA TIMUR 380 Phase 1 79 67 071 14.5 120.23572 -8.56809 14255 5304051002 TEAS NUSA TENGGARA TIMUR 154 Phase 2 40 28 120 6.1 124.31133 -9.95296 14256 5307061015 FUNGAFENG NUSA TENGGARA TIMUR 9 Phase 3 3 2 547 0.5 124.64709 -8.18623 14257 5315040019 GOLO LEWE NUSA TENGGARA TIMUR 697 Phase 1 144 122 256 26.4 120.24308 -8.56891 14258 5304051002 TEAS NUSA TENGGARA TIMUR 25 Phase 2 7 4 921 1.1 124.31332 -9.95644 14259 5307061016 LIKUWATANG NUSA TENGGARA TIMUR 17 Phase 3 5 4 245 0.9 124.64772 -8.18638 14260 5315040019 GOLO LEWE NUSA TENGGARA TIMUR 210 Phase 1 44 37 356 8.1 120.24654 -8.56337 14261 5304051002 TEAS NUSA TENGGARA TIMUR 25 Phase 2 7 4 921 1.1 124.31531 -9.95836 14262 5307061018 DAPITAU NUSA TENGGARA TIMUR 24 Phase 3 11 9 339 2.0 124.65192 -8.19521 14263 5315040017 KOLANG NUSA TENGGARA TIMUR 186 Phase 1 42 35 658 7.7 120.24940 -8.56281 14264 5304051002 TEAS NUSA TENGGARA TIMUR 405 Phase 2 105 73 815 15.9 124.31213 -9.96130 14265 5307061018 DAPITAU NUSA TENGGARA TIMUR 19 Phase 3 9 7 641 1.6 124.65236 -8.20103 14266 5315040017 KOLANG NUSA TENGGARA TIMUR 125 Phase 1 28 23 772 5.1 120.25067 -8.55674 14267 5304051002 TEAS NUSA TENGGARA TIMUR 74 Phase 2 20 14 060 3.0 124.31371 -9.96773 14268 5307061018 DAPITAU NUSA TENGGARA TIMUR 261 Phase 3 117 99 333 21.4 124.66023 -8.20370 14269 5315040020 TUENG NUSA TENGGARA TIMUR 109 Phase 1 24 20 376 4.4 120.25028 -8.55024 14270 5304051001 OE EKAM NUSA TENGGARA TIMUR 418 Phase 2 93 65 379 14.1 124.30820 -9.97570 14271 5307061017 KAFAKBEKA NUSA TENGGARA TIMUR 306 Phase 3 117 99 333 21.4 124.65387 -8.21509 14272 5315040020 TUENG NUSA TENGGARA TIMUR 203 Phase 1 45 38 205 8.2 120.24978 -8.54993 14273 5304051001 OE EKAM NUSA TENGGARA TIMUR 1 620 Phase 2 361 253 783 54.8 124.30125 -9.98122 14274 5307012011 BATU NUSA TENGGARA TIMUR 287 Phase 3 75 63 675 13.7 124.32470 -8.22495 14275 5315040020 TUENG NUSA TENGGARA TIMUR 394 Phase 1 87 73 863 15.9 120.24732 -8.54490 14276 5306020002 KAKANIUK NUSA TENGGARA TIMUR 677 Phase 2 175 123 025 26.5 124.83001 -9.56720 14277 5309060022 BUKIT SEBURI NUSA TENGGARA TIMUR 66 Phase 3 13 11 037 2.4 123.11383 -8.31235 14278 5315040020 TUENG NUSA TENGGARA TIMUR 458 Phase 1 101 85 749 18.5 120.24377 -8.54075 14279 5304041005 TUAKOLE NUSA TENGGARA TIMUR 302 Phase 2 93 65 379 14.1 124.18989 -9.97328 14280 5309060017 DANIBAO NUSA TENGGARA TIMUR 36 Phase 3 8 6 792 1.5 123.10757 -8.31195 14281 5315040017 KOLANG NUSA TENGGARA TIMUR 172 Phase 1 39 33 111 7.1 120.25552 -8.55646 14282 5304041005 TUAKOLE NUSA TENGGARA TIMUR 170 Phase 2 52 36 556 7.9 124.19648 -9.96403 14283 5309060021 TONUWOTAN NUSA TENGGARA TIMUR 196 Phase 3 43 36 507 7.9 123.10900 -8.30528 14284 5315040017 KOLANG NUSA TENGGARA TIMUR 148 Phase 1 34 28 866 6.2 120.26298 -8.55128 14285 5304041005 TUAKOLE NUSA TENGGARA TIMUR 455 Phase 2 139 97 717 21.1 124.20502 -9.95555 14286 5309060021 TONUWOTAN NUSA TENGGARA TIMUR 249 Phase 3 55 46 695 10.1 123.11292 -8.30430 14287 5315040016 PANGGA NUSA TENGGARA TIMUR 72 Phase 1 19 16 131 3.5 120.27493 -8.55230 14288 5303120011 NOELBAKI NUSA TENGGARA TIMUR 91 Phase 2 28 19 684 4.2 123.72724 -10.13323 14289 5308031002 JONTONA NUSA TENGGARA TIMUR 586 Phase 3 51 43 299 9.3 123.51847 -8.30648 14290 5315040016 PANGGA NUSA TENGGARA TIMUR 210 Phase 1 55 46 695 10.1 120.27606 -8.55009 14291 5304060004 KUSI NUSA TENGGARA TIMUR 125 Phase 2 30 21 090 4.6 124.46059 -10.02430 14292 5308031002 JONTONA NUSA TENGGARA TIMUR 152 Phase 3 38 32 262 7.0 123.52119 -8.30466 14293 5315040016 PANGGA NUSA TENGGARA TIMUR 255 Phase 1 67 56 883 12.3 120.28077 -8.54256 14294 5304060005 KUANFATU NUSA TENGGARA TIMUR 928 Phase 2 215 151 145 32.6 124.44888 -10.02364 14295 5309020015 WAIBAO NUSA TENGGARA TIMUR 1 448 Phase 3 278 236 022 50.9 122.80540 -8.19634 14296 5315040016 PANGGA NUSA TENGGARA TIMUR 102 Phase 1 27 22 923 4.9 120.28023 -8.54060 14297 5304103003 FATUMNASI NUSA TENGGARA TIMUR 389 Phase 2 101 71 003 15.3 124.64561 -9.74118 14298 5307061011 LAKWATI NUSA TENGGARA TIMUR 21 Phase 3 7 5 943 1.3 124.65973 -8.22852 14299 5315040016 PANGGA NUSA TENGGARA TIMUR 242 Phase 1 64 54 336 11.7 120.28864 -8.53941 14300 5304103003 FATUMNASI NUSA TENGGARA TIMUR 274 Phase 2 72 50 616 10.9 124.63784 -9.74184 14301 5307061011 LAKWATI NUSA TENGGARA TIMUR 185 Phase 3 60 50 940 11.0 124.65476 -8.23068 14302 5315040016 PANGGA NUSA TENGGARA TIMUR 56 Phase 1 15 12 735 2.7 120.29200 -8.54400 14303 5304103003 FATUMNASI NUSA TENGGARA TIMUR 550 Phase 2 143 100 529 21.7 124.64733 -9.74908 14304 5307061012 FUISAMA NUSA TENGGARA TIMUR 176 Phase 3 88 74 712 16.1 124.63133 -8.24610 14305 5315040016 PANGGA NUSA TENGGARA TIMUR 555 Phase 1 146 123 954 26.7 120.29685 -8.54531 14306 5305023007 OENENU UTARA NUSA TENGGARA TIMUR 93 Phase 2 24 16 872 3.6 124.44442 -9.42816 14307 5307061019 WELAI SELATAN NUSA TENGGARA TIMUR 4 Phase 3 1 849 0.2 124.62663 -8.26096 14308 5315040016 PANGGA NUSA TENGGARA TIMUR 136 Phase 1 36 30 564 6.6 120.28851 -8.52854 14309 5304071005 BABUIN NUSA TENGGARA TIMUR 34 Phase 2 11 7 733 1.7 124.52617 -9.94200 14310 5307061012 FUISAMA NUSA TENGGARA TIMUR 58 Phase 3 29 24 621 5.3 124.62618 -8.26085 14311 5315040025 NDOSO NUSA TENGGARA TIMUR 143 Phase 1 34 28 866 6.2 120.28353 -8.51767 14312 5305023007 OENENU UTARA NUSA TENGGARA TIMUR 128 Phase 2 32 22 496 4.9 124.43628 -9.42584 14313 5307061019 WELAI SELATAN NUSA TENGGARA TIMUR 17 Phase 3 5 4 245 0.9 124.62655 -8.27086 14314 5315040025 NDOSO NUSA TENGGARA TIMUR 129 Phase 1 31 26 319 5.7 120.28273 -8.51662 14315 5305023004 OELBONAK NUSA TENGGARA TIMUR 233 Phase 2 80 56 240 12.1 124.42404 -9.41971 14316 5307061020 TOMINUKU NUSA TENGGARA TIMUR 9 Phase 3 3 2 547 0.5 124.62919 -8.27295 14317 5315040022 COMPANG KULES NUSA TENGGARA TIMUR 461 Phase 1 101 85 749 18.5 120.27727 -8.52239 14318 5305023004 OELBONAK NUSA TENGGARA TIMUR 38 Phase 2 13 9 139 2.0 124.42190 -9.41854 14319 5307061020 TOMINUKU NUSA TENGGARA TIMUR 17 Phase 3 6 5 094 1.1 124.63230 -8.27191 14320 5315040022 COMPANG KULES NUSA TENGGARA TIMUR 294 Phase 1 64 54 336 11.7 120.27078 -8.52654 14321 5305023004 OELBONAK NUSA TENGGARA TIMUR 190 Phase 2 65 45 695 9.9 124.41961 -9.42031 14322 5307061020 TOMINUKU NUSA TENGGARA TIMUR 110 Phase 3 36 30 564 6.6 124.63373 -8.27227 14323 5315040022 COMPANG KULES NUSA TENGGARA TIMUR 308 Phase 1 67 56 883 12.3 120.26688 -8.52406 14324 5305025002 BAAS NUSA TENGGARA TIMUR 276 Phase 2 84 59 052 12.7 124.41397 -9.40971 14325 5307061020 TOMINUKU NUSA TENGGARA TIMUR 185 Phase 3 60 50 940 11.0 124.63575 -8.27469 14326 5315040021 GOLO RIWU NUSA TENGGARA TIMUR 244 Phase 1 58 49 242 10.6 120.26688 -8.52230 14327 5305025002 BAAS NUSA TENGGARA TIMUR 33 Phase 2 11 7 733 1.7 124.41640 -9.40637 14328 5307061020 TOMINUKU NUSA TENGGARA TIMUR 20 Phase 3 7 5 943 1.3 124.63577 -8.27612 14329 5315040021 GOLO RIWU NUSA TENGGARA TIMUR 433 Phase 1 102 86 598 18.7 120.26111 -8.51982 14330 5305025001 FAENNAKE NUSA TENGGARA TIMUR 468 Phase 2 122 85 766 18.5 124.42740 -9.40385 14331 5307061020 TOMINUKU NUSA TENGGARA TIMUR 67 Phase 3 22 18 678 4.0 124.63656 -8.27810 14332 5315040021 GOLO RIWU NUSA TENGGARA TIMUR 365 Phase 2 86 73 014 15.8 120.25618 -8.51607 14333 5305025003 HAUMENI NUSA TENGGARA TIMUR 467 Phase 2 127 89 281 19.3 124.41175 -9.40872 14334 5307061019 WELAI SELATAN NUSA TENGGARA TIMUR 176 Phase 3 44 37 356 8.1 124.62410 -8.27380 Annex II – Demand forecast results Page 51 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 14335 5315040023 WANING NUSA TENGGARA TIMUR 469 Phase 2 94 79 806 17.2 120.29780 -8.51051 14336 5305023003 BUK NUSA TENGGARA TIMUR 879 Phase 2 221 155 363 33.5 124.40487 -9.41108 14337 5307061019 WELAI SELATAN NUSA TENGGARA TIMUR 222 Phase 3 56 47 544 10.3 124.62568 -8.27572 14338 5315040023 WANING NUSA TENGGARA TIMUR 114 Phase 2 23 19 527 4.2 120.29519 -8.50655 14339 5305023003 BUK NUSA TENGGARA TIMUR 512 Phase 2 129 90 687 19.6 124.39653 -9.40409 14340 5307061019 WELAI SELATAN NUSA TENGGARA TIMUR 34 Phase 3 9 7 641 1.6 124.62548 -8.28309 14341 5315040023 WANING NUSA TENGGARA TIMUR 48 Phase 2 10 8 490 1.8 120.29627 -8.50029 14342 5304061007 NUNUSUNU NUSA TENGGARA TIMUR 219 Phase 2 51 35 853 7.7 124.41509 -10.09160 14343 5307061019 WELAI SELATAN NUSA TENGGARA TIMUR 51 Phase 3 13 11 037 2.4 124.62413 -8.28395 14344 5315040025 NDOSO NUSA TENGGARA TIMUR 1 119 Phase 2 263 223 287 48.2 120.30863 -8.49846 14345 5304061004 KUALIN NUSA TENGGARA TIMUR 222 Phase 2 45 31 635 6.8 124.42055 -10.09030 14346 5307030014 MALAIPEA NUSA TENGGARA TIMUR 34 Phase 3 8 6 792 1.5 124.62669 -8.29007 14347 5315040023 WANING NUSA TENGGARA TIMUR 288 Phase 2 58 49 242 10.6 120.29575 -8.49921 14348 5304061004 KUALIN NUSA TENGGARA TIMUR 119 Phase 2 24 16 872 3.6 124.42765 -10.09077 14349 5307030014 MALAIPEA NUSA TENGGARA TIMUR 74 Phase 3 18 15 282 3.3 124.62655 -8.29179 14350 5315040023 WANING NUSA TENGGARA TIMUR 283 Phase 2 57 48 393 10.4 120.29508 -8.49173 14351 5304061004 KUALIN NUSA TENGGARA TIMUR 597 Phase 2 120 84 360 18.2 124.43211 -10.09095 14352 5307030014 MALAIPEA NUSA TENGGARA TIMUR 24 Phase 3 6 5 094 1.1 124.62768 -8.29390 14353 5315040023 WANING NUSA TENGGARA TIMUR 469 Phase 2 94 79 806 17.2 120.29678 -8.49155 14354 5304061004 KUALIN NUSA TENGGARA TIMUR 201 Phase 2 41 28 823 6.2 124.43565 -10.08980 14355 5307030014 MALAIPEA NUSA TENGGARA TIMUR 76 Phase 3 18 15 282 3.3 124.62762 -8.29502 14356 5315040023 WANING NUSA TENGGARA TIMUR 647 Phase 2 129 109 521 23.6 120.29540 -8.48921 14357 5304061004 KUALIN NUSA TENGGARA TIMUR 220 Phase 2 45 31 635 6.8 124.44874 -10.08595 14358 5307030014 MALAIPEA NUSA TENGGARA TIMUR 119 Phase 3 28 23 772 5.1 124.62871 -8.29767 14359 5315040017 KOLANG NUSA TENGGARA TIMUR 209 Phase 2 47 39 903 8.6 120.26413 -8.54198 14360 5304061005 ONI NUSA TENGGARA TIMUR 493 Phase 2 122 85 766 18.5 124.45533 -10.08726 14361 5307030014 MALAIPEA NUSA TENGGARA TIMUR 380 Phase 3 88 74 712 16.1 124.62966 -8.30289 14362 5315040020 TUENG NUSA TENGGARA TIMUR 579 Phase 2 128 108 672 23.4 120.25657 -8.54101 14363 5304061005 ONI NUSA TENGGARA TIMUR 202 Phase 2 50 35 150 7.6 124.45707 -10.08286 14364 5307061019 WELAI SELATAN NUSA TENGGARA TIMUR 12 Phase 3 3 2 547 0.5 124.61856 -8.27644 14365 5315040023 WANING NUSA TENGGARA TIMUR 326 Phase 2 65 55 185 11.9 120.29872 -8.48686 14366 5304061005 ONI NUSA TENGGARA TIMUR 144 Phase 2 36 25 308 5.5 124.46323 -10.08121 14367 5307061019 WELAI SELATAN NUSA TENGGARA TIMUR 136 Phase 3 34 28 866 6.2 124.61637 -8.27763 14368 5315040023 WANING NUSA TENGGARA TIMUR 245 Phase 2 49 41 601 9.0 120.30972 -8.47350 14369 5304061005 ONI NUSA TENGGARA TIMUR 113 Phase 2 28 19 684 4.2 124.46482 -10.07812 14370 5307021006 MATARU UTARA NUSA TENGGARA TIMUR 81 Phase 3 17 14 433 3.1 124.62545 -8.33428 14371 5315040024 WAE BUKA NUSA TENGGARA TIMUR 521 Phase 2 118 100 182 21.6 120.32418 -8.46741 14372 5304061005 ONI NUSA TENGGARA TIMUR 379 Phase 2 94 66 082 14.3 124.46813 -10.07577 14373 5307021006 MATARU UTARA NUSA TENGGARA TIMUR 191 Phase 3 38 32 262 7.0 124.62942 -8.34252 14374 5315040026 LUMUT NUSA TENGGARA TIMUR 1 536 Phase 2 329 279 321 60.3 120.33159 -8.45805 14375 5306012006 WEOE NUSA TENGGARA TIMUR 27 Phase 2 8 5 624 1.2 124.83588 -9.67243 14376 5307021006 MATARU UTARA NUSA TENGGARA TIMUR 35 Phase 3 7 5 943 1.3 124.63418 -8.34715 14377 5313041017 LING NUSA TENGGARA TIMUR 193 Phase 2 48 40 752 8.8 120.36572 -8.69275 14378 5306012006 WEOE NUSA TENGGARA TIMUR 85 Phase 2 24 16 872 3.6 124.83332 -9.67171 14379 5307021005 MATARU TIMUR NUSA TENGGARA TIMUR 435 Phase 3 91 77 259 16.7 124.64371 -8.34082 14380 5319010018 TOROK GOLO NUSA TENGGARA TIMUR 658 Phase 2 141 119 709 25.8 120.55001 -8.73635 14381 5306012012 BIRIS NUSA TENGGARA TIMUR 472 Phase 2 112 78 736 17.0 124.83252 -9.67299 14382 5307021005 MATARU TIMUR NUSA TENGGARA TIMUR 140 Phase 3 30 25 470 5.5 124.65055 -8.33992 14383 5318010014 WOLOEDE NUSA TENGGARA TIMUR 80 Phase 2 19 16 131 3.5 121.21026 -8.84038 14384 5306012012 BIRIS NUSA TENGGARA TIMUR 265 Phase 2 63 44 289 9.6 124.82780 -9.66640 14385 5307021004 TAMAN MATARU NUSA TENGGARA TIMUR 653 Phase 3 139 118 011 25.5 124.65422 -8.33294 14386 5318010014 WOLOEDE NUSA TENGGARA TIMUR 224 Phase 2 52 44 148 9.5 121.20962 -8.83786 14387 5306013006 TAABA NUSA TENGGARA TIMUR 286 Phase 2 77 54 131 11.7 124.82725 -9.65627 14388 5307021003 KAMAIFUI NUSA TENGGARA TIMUR 550 Phase 3 123 104 427 22.5 124.66546 -8.33585 14389 5318010014 WOLOEDE NUSA TENGGARA TIMUR 209 Phase 2 48 40 752 8.8 121.21145 -8.83553 14390 5306011001 SAENAMA NUSA TENGGARA TIMUR 209 Phase 2 56 39 368 8.5 124.82082 -9.64421 14391 5307010044 BUKITMAS NUSA TENGGARA TIMUR 281 Phase 3 70 59 430 12.8 124.23341 -8.24109 14392 5313041008 HILIHINTIR NUSA TENGGARA TIMUR 81 Phase 2 17 14 433 3.1 120.37291 -8.77926 14393 5306011001 SAENAMA NUSA TENGGARA TIMUR 505 Phase 2 134 94 202 20.3 124.82072 -9.63937 14394 5309011012 DUN TANA LEWOINGU NUSA TENGGARA TIMUR 22 Phase 3 5 4 245 0.9 122.82714 -8.39061 14395 5313041007 TERONG NUSA TENGGARA TIMUR 460 Phase 2 118 100 182 21.6 120.36648 -8.79733 14396 5306011001 SAENAMA NUSA TENGGARA TIMUR 250 Phase 2 67 47 101 10.2 124.82283 -9.63513 14397 5309011012 DUN TANA LEWOINGU NUSA TENGGARA TIMUR 218 Phase 3 50 42 450 9.2 122.82739 -8.38656 14398 5313041007 TERONG NUSA TENGGARA TIMUR 247 Phase 2 64 54 336 11.7 120.35981 -8.80382 14399 5314070006 OELOLOT NUSA TENGGARA TIMUR 1 089 Phase 2 308 216 524 46.7 122.83538 -10.82261 14400 5307061011 LAKWATI NUSA TENGGARA TIMUR 335 Phase 3 109 92 541 20.0 124.66157 -8.23057 14401 5313041007 TERONG NUSA TENGGARA TIMUR 174 Phase 2 45 38 205 8.2 120.35426 -8.80905 14402 5304060004 KUSI NUSA TENGGARA TIMUR 172 Phase 2 41 28 823 6.2 124.46341 -10.02573 14403 5310020007 ILIGAI NUSA TENGGARA TIMUR 125 Phase 3 36 30 564 6.6 122.20289 -8.71313 14404 5313041006 CEKA LUJU NUSA TENGGARA TIMUR 454 Phase 2 113 95 937 20.7 120.34963 -8.82025 14405 5306081006 EKIN NUSA TENGGARA TIMUR 79 Phase 2 21 14 763 3.2 125.12782 -9.12233 14406 5307020021 WOLWAL SELATAN NUSA TENGGARA TIMUR 47 Phase 3 12 10 188 2.2 124.43213 -8.30320 14407 5313041006 CEKA LUJU NUSA TENGGARA TIMUR 358 Phase 2 89 75 561 16.3 120.35768 -8.82139 14408 5306081006 EKIN NUSA TENGGARA TIMUR 116 Phase 2 31 21 793 4.7 125.12557 -9.12345 14409 5307014006 ARAMABA NUSA TENGGARA TIMUR 1 076 Phase 3 318 269 982 58.3 124.16909 -8.44522 14410 5313041007 TERONG NUSA TENGGARA TIMUR 143 Phase 2 37 31 413 6.8 120.36396 -8.82025 14411 5306081007 LOONUNA NUSA TENGGARA TIMUR 373 Phase 2 98 68 894 14.9 125.12272 -9.12894 14412 5307061019 WELAI SELATAN NUSA TENGGARA TIMUR 41 Phase 3 11 9 339 2.0 124.62257 -8.27142 14413 5313041007 TERONG NUSA TENGGARA TIMUR 371 Phase 2 95 80 655 17.4 120.36830 -8.81596 14414 5304051002 TEAS NUSA TENGGARA TIMUR 81 Phase 2 21 14 763 3.2 124.32361 -9.93809 14415 5310040019 HIKONG NUSA TENGGARA TIMUR 129 Phase 3 29 24 621 5.3 122.62373 -8.52338 14416 5311070029 WOLOMASI NUSA TENGGARA TIMUR 142 Phase 2 41 34 809 7.5 121.73159 -8.77901 14417 5304051002 TEAS NUSA TENGGARA TIMUR 7 Phase 2 2 1 406 0.3 124.32843 -9.93974 14418 5310040019 HIKONG NUSA TENGGARA TIMUR 319 Phase 3 71 60 279 13.0 122.60998 -8.51933 14419 5311040019 KELIKIKU NUSA TENGGARA TIMUR 243 Phase 2 57 48 393 10.4 121.72728 -8.78585 Annex II – Demand forecast results Page 52 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 14420 5304051003 OEPLIKI NUSA TENGGARA TIMUR 93 Phase 2 26 18 278 3.9 124.32972 -9.93956 14421 5307061010 LEMBUR TENGAH NUSA TENGGARA TIMUR 499 Phase 3 140 118 860 25.6 124.66814 -8.22815 14422 5311040019 KELIKIKU NUSA TENGGARA TIMUR 88 Phase 2 21 17 829 3.8 121.71948 -8.79041 14423 5304051003 OEPLIKI NUSA TENGGARA TIMUR 131 Phase 2 36 25 308 5.5 124.33411 -9.93302 14424 5307061010 LEMBUR TENGAH NUSA TENGGARA TIMUR 419 Phase 3 118 100 182 21.6 124.67134 -8.22648 14425 5311040019 KELIKIKU NUSA TENGGARA TIMUR 99 Phase 2 24 20 376 4.4 121.72733 -8.79538 14426 5304051003 OEPLIKI NUSA TENGGARA TIMUR 63 Phase 2 18 12 654 2.7 124.33618 -9.93067 14427 5307061010 LEMBUR TENGAH NUSA TENGGARA TIMUR 46 Phase 3 13 11 037 2.4 124.68140 -8.21920 14428 5311040019 KELIKIKU NUSA TENGGARA TIMUR 140 Phase 2 33 28 017 6.0 121.72684 -8.79724 14429 5304051003 OEPLIKI NUSA TENGGARA TIMUR 63 Phase 2 18 12 654 2.7 124.33841 -9.92926 14430 5307063006 LUBA NUSA TENGGARA TIMUR 122 Phase 3 31 26 319 5.7 124.68199 -8.21632 14431 5311040014 PUUTUGA NUSA TENGGARA TIMUR 80 Phase 2 24 20 376 4.4 121.72595 -8.79998 14432 5304051003 OEPLIKI NUSA TENGGARA TIMUR 82 Phase 2 23 16 169 3.5 124.34008 -9.92932 14433 5307063006 LUBA NUSA TENGGARA TIMUR 283 Phase 3 71 60 279 13.0 124.68707 -8.21485 14434 5311040014 PUUTUGA NUSA TENGGARA TIMUR 550 Phase 2 160 135 840 29.3 121.72279 -8.80241 14435 5304051006 OEBAKI NUSA TENGGARA TIMUR 125 Phase 2 31 21 793 4.7 124.34042 -9.92902 14436 5307063006 LUBA NUSA TENGGARA TIMUR 121 Phase 3 30 25 470 5.5 124.68851 -8.21510 14437 5311040014 PUUTUGA NUSA TENGGARA TIMUR 105 Phase 2 31 26 319 5.7 121.72419 -8.80623 14438 5304051003 OEPLIKI NUSA TENGGARA TIMUR 24 Phase 2 7 4 921 1.1 124.34001 -9.93130 14439 5307063006 LUBA NUSA TENGGARA TIMUR 126 Phase 3 32 27 168 5.9 124.68932 -8.21448 14440 5315030006 SURUNUMBENG NUSA TENGGARA TIMUR 129 Phase 2 29 24 621 5.3 120.22849 -8.74719 14441 5304051003 OEPLIKI NUSA TENGGARA TIMUR 13 Phase 2 4 2 812 0.6 124.34049 -9.93214 14442 5307012006 KAERA NUSA TENGGARA TIMUR 219 Phase 3 54 45 846 9.9 124.26629 -8.30741 14443 5315030006 SURUNUMBENG NUSA TENGGARA TIMUR 62 Phase 2 14 11 886 2.6 120.22678 -8.74989 14444 5304051003 OEPLIKI NUSA TENGGARA TIMUR 29 Phase 2 8 5 624 1.2 124.34216 -9.93252 14445 5309074004 SAGU NUSA TENGGARA TIMUR 193 Phase 3 45 38 205 8.2 123.21233 -8.23285 14446 5315030006 SURUNUMBENG NUSA TENGGARA TIMUR 1 598 Phase 2 349 296 301 63.9 120.22749 -8.75150 14447 5304051006 OEBAKI NUSA TENGGARA TIMUR 223 Phase 2 54 37 962 8.2 124.34535 -9.93215 14448 5309074004 SAGU NUSA TENGGARA TIMUR 169 Phase 3 40 33 960 7.3 123.21255 -8.23079 14449 5319010003 NANGA LABANG NUSA TENGGARA TIMUR 668 Phase 2 149 126 501 27.3 120.56054 -8.80353 14450 5304051006 OEBAKI NUSA TENGGARA TIMUR 138 Phase 2 34 23 902 5.2 124.34819 -9.93142 14451 5310041004 HODER NUSA TENGGARA TIMUR 102 Phase 3 27 22 923 4.9 122.36791 -8.63146 14452 5313041010 GOLO ROPONG NUSA TENGGARA TIMUR 398 Phase 2 100 84 900 18.3 120.37198 -8.76705 14453 5304051003 OEPLIKI NUSA TENGGARA TIMUR 18 Phase 2 5 3 515 0.8 124.33994 -9.93420 14454 5310041004 HODER NUSA TENGGARA TIMUR 330 Phase 3 88 74 712 16.1 122.38083 -8.63015 14455 5313040018 WAE AJANG NUSA TENGGARA TIMUR 77 Phase 2 17 14 433 3.1 120.43023 -8.74976 14456 5304051003 OEPLIKI NUSA TENGGARA TIMUR 93 Phase 2 26 18 278 3.9 124.33927 -9.94017 14457 5309062002 BAYA NUSA TENGGARA TIMUR 58 Phase 3 15 12 735 2.7 123.13674 -8.29902 14458 5318040014 WEA AU NUSA TENGGARA TIMUR 138 Phase 2 32 27 168 5.9 121.24464 -8.78993 14459 5304051003 OEPLIKI NUSA TENGGARA TIMUR 127 Phase 2 35 24 605 5.3 124.34047 -9.94220 14460 5308070014 BURIWUTUNG NUSA TENGGARA TIMUR 72 Phase 3 19 16 131 3.5 123.80183 -8.19165 14461 5318020004 KOTAWUJI BARAT NUSA TENGGARA TIMUR 112 Phase 2 29 24 621 5.3 121.28638 -8.87157 14462 5304051003 OEPLIKI NUSA TENGGARA TIMUR 44 Phase 2 12 8 436 1.8 124.34113 -9.94397 14463 5308070014 BURIWUTUNG NUSA TENGGARA TIMUR 113 Phase 3 30 25 470 5.5 123.79950 -8.19680 14464 5318020001 MBAENUAMURI NUSA TENGGARA TIMUR 91 Phase 2 25 21 225 4.6 121.28899 -8.88180 14465 5304051003 OEPLIKI NUSA TENGGARA TIMUR 41 Phase 2 12 8 436 1.8 124.33969 -9.94949 14466 5308070014 BURIWUTUNG NUSA TENGGARA TIMUR 75 Phase 3 20 16 980 3.7 123.79719 -8.19497 14467 5318020003 KOTAWUJI TIMUR NUSA TENGGARA TIMUR 128 Phase 2 32 27 168 5.9 121.29522 -8.88077 14468 5304051003 OEPLIKI NUSA TENGGARA TIMUR 48 Phase 2 14 9 842 2.1 124.33950 -9.95145 14469 5310041009 RUNUT NUSA TENGGARA TIMUR 178 Phase 3 43 36 507 7.9 122.51410 -8.57597 14470 5318020003 KOTAWUJI TIMUR NUSA TENGGARA TIMUR 322 Phase 2 79 67 071 14.5 121.29705 -8.87817 14471 5304051003 OEPLIKI NUSA TENGGARA TIMUR 15 Phase 2 5 3 515 0.8 124.33993 -9.95440 14472 5310040016 DARAT GUNUNG NUSA TENGGARA TIMUR 347 Phase 3 95 80 655 17.4 122.57298 -8.52225 14473 5318020003 KOTAWUJI TIMUR NUSA TENGGARA TIMUR 271 Phase 2 66 56 034 12.1 121.30331 -8.87796 14474 5304051003 OEPLIKI NUSA TENGGARA TIMUR 55 Phase 2 15 10 545 2.3 124.33989 -9.95697 14475 5309010001 OJAN DETUN NUSA TENGGARA TIMUR 549 Phase 3 118 100 182 21.6 122.68301 -8.61554 14476 5313140013 BARU NUSA TENGGARA TIMUR 87 Phase 2 21 17 829 3.8 120.48922 -8.29367 14477 5304051003 OEPLIKI NUSA TENGGARA TIMUR 61 Phase 2 17 11 951 2.6 124.33926 -9.95943 14478 5308011013 TAPOBALI NUSA TENGGARA TIMUR 309 Phase 3 89 75 561 16.3 123.36780 -8.54240 14479 5319050003 MANDO SAWU NUSA TENGGARA TIMUR 63 Phase 2 14 11 886 2.6 120.54264 -8.59109 14480 5304051003 OEPLIKI NUSA TENGGARA TIMUR 392 Phase 2 107 75 221 16.2 124.33946 -9.97686 14481 5308011001 LELATA NUSA TENGGARA TIMUR 390 Phase 3 113 95 937 20.7 123.37830 -8.54879 14482 5319050003 MANDO SAWU NUSA TENGGARA TIMUR 237 Phase 2 52 44 148 9.5 120.53506 -8.59084 14483 5304051003 OEPLIKI NUSA TENGGARA TIMUR 71 Phase 2 20 14 060 3.0 124.34268 -9.97797 14484 5308040007 TAPOBARAN NUSA TENGGARA TIMUR 345 Phase 3 86 73 014 15.8 123.59497 -8.30772 14485 5319050003 MANDO SAWU NUSA TENGGARA TIMUR 210 Phase 2 46 39 054 8.4 120.53369 -8.59266 14486 5304051003 OEPLIKI NUSA TENGGARA TIMUR 329 Phase 2 90 63 270 13.7 124.34624 -9.97871 14487 5307061010 LEMBUR TENGAH NUSA TENGGARA TIMUR 23 Phase 3 7 5 943 1.3 124.67012 -8.23209 14488 5319050001 GOLO LOBOS NUSA TENGGARA TIMUR 988 Phase 2 203 172 347 37.2 120.53022 -8.59234 14489 5304051005 FATUTNANA NUSA TENGGARA TIMUR 44 Phase 2 13 9 139 2.0 124.35127 -9.99045 14490 5307061003 MANETWATI NUSA TENGGARA TIMUR 346 Phase 3 81 68 769 14.8 124.68409 -8.24339 14491 5319050001 GOLO LOBOS NUSA TENGGARA TIMUR 214 Phase 2 44 37 356 8.1 120.52523 -8.58851 14492 5304051005 FATUTNANA NUSA TENGGARA TIMUR 869 Phase 2 242 170 126 36.7 124.35255 -9.99718 14493 5307061003 MANETWATI NUSA TENGGARA TIMUR 202 Phase 3 48 40 752 8.8 124.68603 -8.24898 14494 5319050001 GOLO LOBOS NUSA TENGGARA TIMUR 45 Phase 2 10 8 490 1.8 120.51941 -8.58551 14495 5304051003 OEPLIKI NUSA TENGGARA TIMUR 22 Phase 2 6 4 218 0.9 124.33907 -9.97943 14496 5310082017 PARUMAAN NUSA TENGGARA TIMUR 79 Phase 3 23 19 527 4.2 122.43222 -8.47478 14497 5313121008 GOLO MENDO NUSA TENGGARA TIMUR 964 Phase 2 218 185 082 39.9 120.51039 -8.58778 14498 5304051003 OEPLIKI NUSA TENGGARA TIMUR 204 Phase 2 56 39 368 8.5 124.33752 -9.98087 14499 5307063001 TALWAI NUSA TENGGARA TIMUR 136 Phase 3 33 28 017 6.0 124.69868 -8.24579 14500 5319050001 GOLO LOBOS NUSA TENGGARA TIMUR 655 Phase 2 135 114 615 24.7 120.51369 -8.57637 14501 5320010001 KOLORAE NUSA TENGGARA TIMUR 1 331 Phase 2 440 309 320 66.7 121.51974 -10.64361 14502 5307063001 TALWAI NUSA TENGGARA TIMUR 235 Phase 3 57 48 393 10.4 124.70379 -8.24178 14503 5318020001 MBAENUAMURI NUSA TENGGARA TIMUR 149 Phase 2 40 33 960 7.3 121.28688 -8.88576 14504 5306011016 NABUTAEK NUSA TENGGARA TIMUR 54 Phase 2 12 8 436 1.8 124.72728 -9.62065 Annex II – Demand forecast results Page 53 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 14505 5307063001 TALWAI NUSA TENGGARA TIMUR 95 Phase 3 23 19 527 4.2 124.70570 -8.24089 14506 5318020001 MBAENUAMURI NUSA TENGGARA TIMUR 113 Phase 2 31 26 319 5.7 121.28234 -8.88574 14507 5306011006 NITI NUSA TENGGARA TIMUR 306 Phase 2 73 51 319 11.1 124.72224 -9.62268 14508 5307063003 TASI NUSA TENGGARA TIMUR 67 Phase 3 18 15 282 3.3 124.70849 -8.23231 14509 5318020001 MBAENUAMURI NUSA TENGGARA TIMUR 786 Phase 2 210 178 290 38.5 121.28043 -8.88971 14510 5304100016 SUNU NUSA TENGGARA TIMUR 16 Phase 2 5 3 515 0.8 124.63586 -9.81885 14511 5307063003 TASI NUSA TENGGARA TIMUR 46 Phase 3 12 10 188 2.2 124.70990 -8.23167 14512 5318020009 KELI NUSA TENGGARA TIMUR 364 Phase 2 85 72 165 15.6 121.27981 -8.88277 14513 5304100016 SUNU NUSA TENGGARA TIMUR 45 Phase 2 14 9 842 2.1 124.63591 -9.81854 14514 5307063003 TASI NUSA TENGGARA TIMUR 332 Phase 3 86 73 014 15.8 124.71289 -8.23041 14515 5312011005 NENOWEA NUSA TENGGARA TIMUR 33 Phase 2 12 10 188 2.2 121.01323 -8.91617 14516 5304100016 SUNU NUSA TENGGARA TIMUR 35 Phase 2 11 7 733 1.7 124.63399 -9.81829 14517 5309060010 WUREH NUSA TENGGARA TIMUR 152 Phase 3 43 36 507 7.9 123.02917 -8.31617 14518 5312011008 NARUWOLO II NUSA TENGGARA TIMUR 110 Phase 2 26 22 074 4.8 121.01367 -8.91713 14519 5304100016 SUNU NUSA TENGGARA TIMUR 72 Phase 2 22 15 466 3.3 124.63313 -9.81822 14520 5310082015 KOJADOI NUSA TENGGARA TIMUR 641 Phase 3 183 155 367 33.5 122.41337 -8.47648 14521 5312011005 NENOWEA NUSA TENGGARA TIMUR 308 Phase 2 107 90 843 19.6 121.00421 -8.92499 14522 5304100016 SUNU NUSA TENGGARA TIMUR 102 Phase 2 31 21 793 4.7 124.63183 -9.82007 14523 5307063002 WAIMI NUSA TENGGARA TIMUR 595 Phase 3 160 135 840 29.3 124.73080 -8.23987 14524 5312020002 FAOBATA NUSA TENGGARA TIMUR 449 Phase 2 84 71 316 15.4 121.00113 -8.76448 14525 5304060005 KUANFATU NUSA TENGGARA TIMUR 124 Phase 2 29 20 387 4.4 124.44790 -10.02546 14526 5308020016 KATAKEJA NUSA TENGGARA TIMUR 373 Phase 3 98 83 202 18.0 123.44697 -8.44710 14527 5312020002 FAOBATA NUSA TENGGARA TIMUR 208 Phase 2 39 33 111 7.1 120.99931 -8.76577 14528 5306020004 KATERI NUSA TENGGARA TIMUR 324 Phase 2 92 64 676 14.0 124.83086 -9.55927 14529 5309073008 ADOBALA NUSA TENGGARA TIMUR 567 Phase 3 87 73 863 15.9 123.24501 -8.26332 14530 5312030006 TAKATUNGA NUSA TENGGARA TIMUR 321 Phase 2 79 67 071 14.5 121.10852 -8.84183 14531 5306012001 LAMEA NUSA TENGGARA TIMUR 55 Phase 2 15 10 545 2.3 124.82281 -9.75117 14532 5309041002 KENERE NUSA TENGGARA TIMUR 56 Phase 3 13 11 037 2.4 122.99220 -8.50033 14533 5312030006 TAKATUNGA NUSA TENGGARA TIMUR 395 Phase 2 97 82 353 17.8 121.11722 -8.84215 14534 5306012001 LAMEA NUSA TENGGARA TIMUR 516 Phase 2 132 92 796 20.0 124.81889 -9.75606 14535 5309041001 SULENGWASENG NUSA TENGGARA TIMUR 615 Phase 3 138 117 162 25.3 122.97486 -8.50723 14536 5312030006 TAKATUNGA NUSA TENGGARA TIMUR 126 Phase 2 31 26 319 5.7 121.11858 -8.83894 14537 5306011016 NABUTAEK NUSA TENGGARA TIMUR 60 Phase 2 14 9 842 2.1 124.72222 -9.62369 14538 5310040017 DARAT PANTAI NUSA TENGGARA TIMUR 4 Phase 3 2 1 698 0.4 122.48494 -8.50005 14539 5310071003 REROROJA NUSA TENGGARA TIMUR 86 Phase 2 19 16 131 3.5 122.03466 -8.54800 14540 5304060005 KUANFATU NUSA TENGGARA TIMUR 67 Phase 2 16 11 248 2.4 124.44684 -10.02485 14541 5307063001 TALWAI NUSA TENGGARA TIMUR 129 Phase 3 32 27 168 5.9 124.72352 -8.25605 14542 5310071003 REROROJA NUSA TENGGARA TIMUR 60 Phase 2 13 11 037 2.4 122.03404 -8.55133 14543 5306081007 LOONUNA NUSA TENGGARA TIMUR 338 Phase 2 89 62 567 13.5 125.11960 -9.13623 14544 5307063001 TALWAI NUSA TENGGARA TIMUR 131 Phase 3 32 27 168 5.9 124.72438 -8.25782 14545 5310071003 REROROJA NUSA TENGGARA TIMUR 117 Phase 2 25 21 225 4.6 122.03074 -8.55369 14546 5304060005 KUANFATU NUSA TENGGARA TIMUR 177 Phase 2 41 28 823 6.2 124.44545 -10.02247 14547 5307030010 KELAISI TIMUR NUSA TENGGARA TIMUR 88 Phase 3 21 17 829 3.8 124.72704 -8.26703 14548 5310071003 REROROJA NUSA TENGGARA TIMUR 596 Phase 2 126 106 974 23.1 122.02720 -8.55201 14549 5304060005 KUANFATU NUSA TENGGARA TIMUR 232 Phase 2 54 37 962 8.2 124.44674 -10.01803 14550 5307030010 KELAISI TIMUR NUSA TENGGARA TIMUR 134 Phase 3 32 27 168 5.9 124.72758 -8.26948 14551 5313121010 COMPANG NDEHES NUSA TENGGARA TIMUR 94 Phase 2 21 17 829 3.8 120.50441 -8.54837 14552 5304060007 BASMUTI NUSA TENGGARA TIMUR 389 Phase 2 91 63 973 13.8 124.44418 -10.00906 14553 5307030010 KELAISI TIMUR NUSA TENGGARA TIMUR 24 Phase 3 6 5 094 1.1 124.72489 -8.27136 14554 5313121010 COMPANG NDEHES NUSA TENGGARA TIMUR 104 Phase 2 24 20 376 4.4 120.50404 -8.54596 14555 5304060007 BASMUTI NUSA TENGGARA TIMUR 120 Phase 2 28 19 684 4.2 124.44636 -10.00797 14556 5307030010 KELAISI TIMUR NUSA TENGGARA TIMUR 401 Phase 3 96 81 504 17.6 124.72334 -8.27332 14557 5313041009 BEA KONDO NUSA TENGGARA TIMUR 25 Phase 2 6 5 094 1.1 120.36990 -8.74474 14558 5306031002 TNIUMANU NUSA TENGGARA TIMUR 409 Phase 2 94 66 082 14.3 124.78174 -9.39852 14559 5307030010 KELAISI TIMUR NUSA TENGGARA TIMUR 62 Phase 3 15 12 735 2.7 124.72124 -8.27183 14560 5313041011 RENDA NUSA TENGGARA TIMUR 196 Phase 2 54 45 846 9.9 120.36939 -8.74471 14561 5306031002 TNIUMANU NUSA TENGGARA TIMUR 73 Phase 2 17 11 951 2.6 124.78771 -9.39530 14562 5307030011 SUBO NUSA TENGGARA TIMUR 20 Phase 3 5 4 245 0.9 124.72029 -8.27476 14563 5313040017 GARA NUSA TENGGARA TIMUR 306 Phase 2 64 54 336 11.7 120.43850 -8.75122 14564 5306031002 TNIUMANU NUSA TENGGARA TIMUR 215 Phase 2 50 35 150 7.6 124.78918 -9.39562 14565 5307030011 SUBO NUSA TENGGARA TIMUR 23 Phase 3 6 5 094 1.1 124.72046 -8.27731 14566 5310070011 NIRANGKLIUNG NUSA TENGGARA TIMUR 17 Phase 2 5 4 245 0.9 122.08863 -8.64800 14567 5304060004 KUSI NUSA TENGGARA TIMUR 58 Phase 2 14 9 842 2.1 124.46586 -10.02794 14568 5307030011 SUBO NUSA TENGGARA TIMUR 470 Phase 3 116 98 484 21.2 124.72010 -8.27997 14569 5310070011 NIRANGKLIUNG NUSA TENGGARA TIMUR 599 Phase 2 167 141 783 30.6 122.08792 -8.64458 14570 5304060004 KUSI NUSA TENGGARA TIMUR 56 Phase 2 14 9 842 2.1 124.46820 -10.02692 14571 5307030011 SUBO NUSA TENGGARA TIMUR 44 Phase 3 11 9 339 2.0 124.71278 -8.28160 14572 5310070011 NIRANGKLIUNG NUSA TENGGARA TIMUR 340 Phase 2 95 80 655 17.4 122.09724 -8.63883 14573 5304060004 KUSI NUSA TENGGARA TIMUR 67 Phase 2 16 11 248 2.4 124.47032 -10.02797 14574 5307030012 KELAISI TENGAH NUSA TENGGARA TIMUR 30 Phase 3 9 7 641 1.6 124.70295 -8.27930 14575 5315030019 WAE BANGKA NUSA TENGGARA TIMUR 137 Phase 2 32 27 168 5.9 120.30140 -8.69270 14576 5304060004 KUSI NUSA TENGGARA TIMUR 180 Phase 2 42 29 526 6.4 124.47327 -10.02522 14577 5307030012 KELAISI TENGAH NUSA TENGGARA TIMUR 64 Phase 3 19 16 131 3.5 124.70268 -8.27852 14578 5313130026 GOLO LANAK NUSA TENGGARA TIMUR 76 Phase 2 18 15 282 3.3 120.42695 -8.43959 14579 5304060004 KUSI NUSA TENGGARA TIMUR 181 Phase 2 43 30 229 6.5 124.47339 -10.03706 14580 5307030012 KELAISI TENGAH NUSA TENGGARA TIMUR 221 Phase 3 64 54 336 11.7 124.70341 -8.27707 14581 5313130026 GOLO LANAK NUSA TENGGARA TIMUR 502 Phase 2 117 99 333 21.4 120.42706 -8.43570 14582 5304060004 KUSI NUSA TENGGARA TIMUR 192 Phase 2 45 31 635 6.8 124.47171 -10.04079 14583 5307030012 KELAISI TENGAH NUSA TENGGARA TIMUR 144 Phase 3 42 35 658 7.7 124.70044 -8.27299 14584 5319050002 BANGKA KULENG NUSA TENGGARA TIMUR 247 Phase 2 62 52 638 11.4 120.54159 -8.57381 14585 5304060004 KUSI NUSA TENGGARA TIMUR 348 Phase 2 82 57 646 12.4 124.46548 -10.03955 14586 5307030012 KELAISI TENGAH NUSA TENGGARA TIMUR 182 Phase 3 53 44 997 9.7 124.70153 -8.27105 14587 5319050005 NGGALAK LELENG NUSA TENGGARA TIMUR 44 Phase 2 12 10 188 2.2 120.55136 -8.58899 14588 5304061005 ONI NUSA TENGGARA TIMUR 45 Phase 2 12 8 436 1.8 124.46123 -10.04461 14589 5307030012 KELAISI TENGAH NUSA TENGGARA TIMUR 63 Phase 3 19 16 131 3.5 124.70169 -8.27802 Annex II – Demand forecast results Page 54 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 14590 5319050005 NGGALAK LELENG NUSA TENGGARA TIMUR 36 Phase 2 10 8 490 1.8 120.55218 -8.59084 14591 5304061005 ONI NUSA TENGGARA TIMUR 612 Phase 2 151 106 153 22.9 124.45943 -10.05857 14592 5307030012 KELAISI TENGAH NUSA TENGGARA TIMUR 84 Phase 3 25 21 225 4.6 124.70076 -8.27856 14593 5319050005 NGGALAK LELENG NUSA TENGGARA TIMUR 244 Phase 2 66 56 034 12.1 120.56165 -8.59129 14594 5304060004 KUSI NUSA TENGGARA TIMUR 96 Phase 2 23 16 169 3.5 124.47607 -10.03575 14595 5307030013 KELAISI BARAT NUSA TENGGARA TIMUR 10 Phase 3 3 2 547 0.5 124.68902 -8.28392 14596 5319050005 NGGALAK LELENG NUSA TENGGARA TIMUR 39 Phase 2 11 9 339 2.0 120.56187 -8.58438 14597 5304060007 BASMUTI NUSA TENGGARA TIMUR 177 Phase 2 42 29 526 6.4 124.43076 -10.00254 14598 5307030013 KELAISI BARAT NUSA TENGGARA TIMUR 116 Phase 3 29 24 621 5.3 124.69082 -8.28790 14599 5319050005 NGGALAK LELENG NUSA TENGGARA TIMUR 121 Phase 2 33 28 017 6.0 120.56443 -8.58161 14600 5304060007 BASMUTI NUSA TENGGARA TIMUR 105 Phase 2 25 17 575 3.8 124.43018 -10.00061 14601 5307030013 KELAISI BARAT NUSA TENGGARA TIMUR 332 Phase 3 81 68 769 14.8 124.68551 -8.28859 14602 5319050016 GURUNG TURI NUSA TENGGARA TIMUR 105 Phase 2 24 20 376 4.4 120.56371 -8.57276 14603 5304060007 BASMUTI NUSA TENGGARA TIMUR 219 Phase 2 51 35 853 7.7 124.42208 -10.00115 14604 5307030013 KELAISI BARAT NUSA TENGGARA TIMUR 136 Phase 3 34 28 866 6.2 124.68204 -8.28735 14605 5319050016 GURUNG TURI NUSA TENGGARA TIMUR 682 Phase 2 155 131 595 28.4 120.56216 -8.56682 14606 5304060007 BASMUTI NUSA TENGGARA TIMUR 427 Phase 2 100 70 300 15.2 124.41492 -10.00217 14607 5307030013 KELAISI BARAT NUSA TENGGARA TIMUR 30 Phase 3 8 6 792 1.5 124.68686 -8.28313 14608 5319050016 GURUNG TURI NUSA TENGGARA TIMUR 167 Phase 2 38 32 262 7.0 120.55773 -8.56734 14609 5304060007 BASMUTI NUSA TENGGARA TIMUR 248 Phase 2 58 40 774 8.8 124.40566 -10.00396 14610 5307030013 KELAISI BARAT NUSA TENGGARA TIMUR 32 Phase 3 8 6 792 1.5 124.68689 -8.28231 14611 5319050016 GURUNG TURI NUSA TENGGARA TIMUR 246 Phase 2 56 47 544 10.3 120.55609 -8.56566 14612 5304060007 BASMUTI NUSA TENGGARA TIMUR 480 Phase 2 112 78 736 17.0 124.40338 -10.01134 14613 5307030013 KELAISI BARAT NUSA TENGGARA TIMUR 26 Phase 3 7 5 943 1.3 124.68652 -8.28101 14614 5313041005 SATAR LUJU NUSA TENGGARA TIMUR 936 Phase 2 200 169 800 36.6 120.32486 -8.81019 14615 5304060007 BASMUTI NUSA TENGGARA TIMUR 266 Phase 2 62 43 586 9.4 124.43571 -9.99220 14616 5307012006 KAERA NUSA TENGGARA TIMUR 137 Phase 3 34 28 866 6.2 124.25115 -8.31195 14617 5319050021 POCONG NUSA TENGGARA TIMUR 466 Phase 2 107 90 843 19.6 120.56176 -8.55678 14618 5304060007 BASMUTI NUSA TENGGARA TIMUR 364 Phase 2 85 59 755 12.9 124.44085 -9.98240 14619 5307012006 KAERA NUSA TENGGARA TIMUR 49 Phase 3 13 11 037 2.4 124.25034 -8.30963 14620 5318060016 NGGOLONIO NUSA TENGGARA TIMUR 56 Phase 2 16 13 584 2.9 121.23597 -8.48469 14621 5304060009 LASI NUSA TENGGARA TIMUR 288 Phase 2 70 49 210 10.6 124.44132 -9.97702 14622 5307012006 KAERA NUSA TENGGARA TIMUR 26 Phase 3 7 5 943 1.3 124.24984 -8.30963 14623 5318060016 NGGOLONIO NUSA TENGGARA TIMUR 213 Phase 2 59 50 091 10.8 121.22241 -8.47082 14624 5304060009 LASI NUSA TENGGARA TIMUR 342 Phase 2 83 58 349 12.6 124.44558 -9.97250 14625 5307012007 LEKOM NUSA TENGGARA TIMUR 188 Phase 3 41 34 809 7.5 124.23375 -8.32462 14626 5318060016 NGGOLONIO NUSA TENGGARA TIMUR 294 Phase 2 82 69 618 15.0 121.21900 -8.46821 14627 5304060009 LASI NUSA TENGGARA TIMUR 307 Phase 2 75 52 725 11.4 124.44337 -9.97029 14628 5307012007 LEKOM NUSA TENGGARA TIMUR 297 Phase 3 64 54 336 11.7 124.22871 -8.32632 14629 5318060016 NGGOLONIO NUSA TENGGARA TIMUR 101 Phase 2 28 23 772 5.1 121.21704 -8.47643 14630 5304060009 LASI NUSA TENGGARA TIMUR 539 Phase 2 130 91 390 19.7 124.45245 -9.97216 14631 5308020022 NUBABOLI NUSA TENGGARA TIMUR 213 Phase 3 56 47 544 10.3 123.48853 -8.42551 14632 5318060016 NGGOLONIO NUSA TENGGARA TIMUR 111 Phase 2 31 26 319 5.7 121.21529 -8.47901 14633 5304060009 LASI NUSA TENGGARA TIMUR 259 Phase 2 63 44 289 9.6 124.45122 -9.96165 14634 5309060017 DANIBAO NUSA TENGGARA TIMUR 86 Phase 3 19 16 131 3.5 123.10345 -8.31334 14635 5318060016 NGGOLONIO NUSA TENGGARA TIMUR 204 Phase 2 57 48 393 10.4 121.21684 -8.48084 14636 5304060010 OLAIS NUSA TENGGARA TIMUR 1 195 Phase 2 266 186 998 40.3 124.44437 -9.95142 14637 5307020025 MORAMAM NUSA TENGGARA TIMUR 195 Phase 3 43 36 507 7.9 124.51861 -8.26712 14638 5318060016 NGGOLONIO NUSA TENGGARA TIMUR 129 Phase 2 36 30 564 6.6 121.22465 -8.46723 14639 5305023001 NIMASI NUSA TENGGARA TIMUR 18 Phase 2 6 4 218 0.9 124.41481 -9.45883 14640 5310082016 KOJAGETE NUSA TENGGARA TIMUR 197 Phase 3 41 34 809 7.5 122.40276 -8.44841 14641 5318060016 NGGOLONIO NUSA TENGGARA TIMUR 43 Phase 2 12 10 188 2.2 121.21815 -8.46689 14642 5304042003 TETAF NUSA TENGGARA TIMUR 179 Phase 2 43 30 229 6.5 124.42628 -9.82852 14643 5310082016 KOJAGETE NUSA TENGGARA TIMUR 490 Phase 3 101 85 749 18.5 122.39209 -8.43616 14644 5319050021 POCONG NUSA TENGGARA TIMUR 181 Phase 2 42 35 658 7.7 120.56886 -8.55761 14645 5305044003 FAFINESU A NUSA TENGGARA TIMUR 86 Phase 2 23 16 169 3.5 124.58186 -9.39900 14646 5310082016 KOJAGETE NUSA TENGGARA TIMUR 144 Phase 3 30 25 470 5.5 122.37578 -8.42985 14647 5319050016 GURUNG TURI NUSA TENGGARA TIMUR 178 Phase 2 41 34 809 7.5 120.56901 -8.55884 14648 5305044006 FAFINESU NUSA TENGGARA TIMUR 228 Phase 2 58 40 774 8.8 124.57585 -9.38913 14649 5310082016 KOJAGETE NUSA TENGGARA TIMUR 631 Phase 3 130 110 370 23.8 122.35188 -8.43090 14650 5319050021 POCONG NUSA TENGGARA TIMUR 49 Phase 2 12 10 188 2.2 120.56999 -8.55593 14651 5305044006 FAFINESU NUSA TENGGARA TIMUR 39 Phase 2 10 7 030 1.5 124.57546 -9.38215 14652 5307010026 BAOLANG NUSA TENGGARA TIMUR 447 Phase 3 142 120 558 26.0 124.16658 -8.30419 14653 5319050021 POCONG NUSA TENGGARA TIMUR 220 Phase 2 51 43 299 9.3 120.57233 -8.55707 14654 5305044006 FAFINESU NUSA TENGGARA TIMUR 306 Phase 2 78 54 834 11.8 124.57175 -9.37307 14655 5310041007 WAIRTERANG NUSA TENGGARA TIMUR 30 Phase 3 8 6 792 1.5 122.45075 -8.62141 14656 5319020011 PONG RUAN NUSA TENGGARA TIMUR 614 Phase 2 153 129 897 28.0 120.67372 -8.75425 14657 5305044002 FAFINESU B NUSA TENGGARA TIMUR 54 Phase 2 15 10 545 2.3 124.56433 -9.35259 14658 5310041006 NANGATOBONG NUSA TENGGARA TIMUR 168 Phase 3 53 44 997 9.7 122.44374 -8.62420 14659 5319020011 PONG RUAN NUSA TENGGARA TIMUR 194 Phase 2 49 41 601 9.0 120.68309 -8.75048 14660 5305044001 OENAIN NUSA TENGGARA TIMUR 437 Phase 2 118 82 954 17.9 124.54289 -9.35808 14661 5307020005 KUIFANA NUSA TENGGARA TIMUR 419 Phase 3 81 68 769 14.8 124.53123 -8.39261 14662 5319020011 PONG RUAN NUSA TENGGARA TIMUR 19 Phase 2 5 4 245 0.9 120.68370 -8.74990 14663 5305020036 TUNOE NUSA TENGGARA TIMUR 850 Phase 2 246 172 938 37.3 124.52573 -9.35783 14664 5307020005 KUIFANA NUSA TENGGARA TIMUR 394 Phase 3 76 64 524 13.9 124.53768 -8.38994 14665 5319020012 GOLO TOLANG NUSA TENGGARA TIMUR 447 Phase 2 106 89 994 19.4 120.68565 -8.74888 14666 5305020035 JAK NUSA TENGGARA TIMUR 503 Phase 2 149 104 747 22.6 124.51932 -9.36019 14667 5309021006 PAINAPANG NUSA TENGGARA TIMUR 160 Phase 3 4 3 396 0.7 122.97386 -8.21846 14668 5319020012 GOLO TOLANG NUSA TENGGARA TIMUR 108 Phase 2 26 22 074 4.8 120.68932 -8.74681 14669 5305020035 JAK NUSA TENGGARA TIMUR 48 Phase 2 15 10 545 2.3 124.51663 -9.36279 14670 5309021006 PAINAPANG NUSA TENGGARA TIMUR 328 Phase 3 72 61 128 13.2 122.97106 -8.21489 14671 5319020012 GOLO TOLANG NUSA TENGGARA TIMUR 129 Phase 2 31 26 319 5.7 120.69113 -8.74622 14672 5305020035 JAK NUSA TENGGARA TIMUR 18 Phase 2 6 4 218 0.9 124.51497 -9.36352 14673 5309020016 NUSANIPA NUSA TENGGARA TIMUR 374 Phase 3 94 79 806 17.2 122.78923 -8.15529 14674 5319020008 MBENGAN NUSA TENGGARA TIMUR 370 Phase 2 81 68 769 14.8 120.69799 -8.74732 Annex II – Demand forecast results Page 55 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 14675 5305020037 TUNTUN NUSA TENGGARA TIMUR 610 Phase 2 197 138 491 29.9 124.50876 -9.36557 14676 5309020016 NUSANIPA NUSA TENGGARA TIMUR 112 Phase 3 29 24 621 5.3 122.78634 -8.15355 14677 5319020008 MBENGAN NUSA TENGGARA TIMUR 134 Phase 2 30 25 470 5.5 120.70845 -8.74840 14678 5305044002 FAFINESU B NUSA TENGGARA TIMUR 985 Phase 2 267 187 701 40.5 124.57034 -9.34862 14679 5309020017 LAMATUTU NUSA TENGGARA TIMUR 732 Phase 3 159 134 991 29.1 122.79036 -8.13526 14680 5319020008 MBENGAN NUSA TENGGARA TIMUR 216 Phase 2 48 40 752 8.8 120.70795 -8.75076 14681 5305023001 NIMASI NUSA TENGGARA TIMUR 20 Phase 2 7 4 921 1.1 124.42305 -9.44837 14682 5307020019 PROBUR UTARA NUSA TENGGARA TIMUR 334 Phase 3 74 62 826 13.6 124.40673 -8.31254 14683 5319020008 MBENGAN NUSA TENGGARA TIMUR 169 Phase 2 37 31 413 6.8 120.70876 -8.75940 14684 5305023001 NIMASI NUSA TENGGARA TIMUR 93 Phase 2 29 20 387 4.4 124.42404 -9.44894 14685 5309040005 KALELU NUSA TENGGARA TIMUR 116 Phase 3 29 24 621 5.3 122.95650 -8.53615 14686 5319020008 MBENGAN NUSA TENGGARA TIMUR 166 Phase 2 37 31 413 6.8 120.70719 -8.76226 14687 5305023001 NIMASI NUSA TENGGARA TIMUR 540 Phase 2 163 114 589 24.7 124.42257 -9.44550 14688 5309040005 KALELU NUSA TENGGARA TIMUR 302 Phase 3 75 63 675 13.7 122.95786 -8.53835 14689 5319020008 MBENGAN NUSA TENGGARA TIMUR 896 Phase 2 196 166 404 35.9 120.71224 -8.76430 14690 5306081007 LOONUNA NUSA TENGGARA TIMUR 48 Phase 2 13 9 139 2.0 125.11624 -9.13823 14691 5309040005 KALELU NUSA TENGGARA TIMUR 10 Phase 3 3 2 547 0.5 122.93928 -8.54038 14692 5319020007 RANA KOLONG NUSA TENGGARA TIMUR 624 Phase 2 169 143 481 31.0 120.71833 -8.76530 14693 5306081007 LOONUNA NUSA TENGGARA TIMUR 123 Phase 2 33 23 199 5.0 125.10828 -9.14253 14694 5309040004 LAMAWALANG NUSA TENGGARA TIMUR 205 Phase 3 64 54 336 11.7 122.93741 -8.54169 14695 5319020007 RANA KOLONG NUSA TENGGARA TIMUR 100 Phase 2 28 23 772 5.1 120.71882 -8.76147 14696 5306081002 LUTHA RATO NUSA TENGGARA TIMUR 134 Phase 2 40 28 120 6.1 125.10881 -9.14530 14697 5309040002 LAMAOLE NUSA TENGGARA TIMUR 89 Phase 3 25 21 225 4.6 122.90379 -8.55254 14698 5319020007 RANA KOLONG NUSA TENGGARA TIMUR 150 Phase 2 41 34 809 7.5 120.72445 -8.75994 14699 5306081002 LUTHA RATO NUSA TENGGARA TIMUR 101 Phase 2 30 21 090 4.6 125.10711 -9.14679 14700 5309040002 LAMAOLE NUSA TENGGARA TIMUR 42 Phase 3 12 10 188 2.2 122.90104 -8.55440 14701 5319020007 RANA KOLONG NUSA TENGGARA TIMUR 806 Phase 2 219 185 931 40.1 120.73121 -8.75985 14702 5306081007 LOONUNA NUSA TENGGARA TIMUR 60 Phase 2 16 11 248 2.4 125.10540 -9.14225 14703 5309040002 LAMAOLE NUSA TENGGARA TIMUR 175 Phase 3 48 40 752 8.8 122.89426 -8.55839 14704 5319020008 MBENGAN NUSA TENGGARA TIMUR 65 Phase 2 15 12 735 2.7 120.71139 -8.74747 14705 5306081002 LUTHA RATO NUSA TENGGARA TIMUR 284 Phase 2 83 58 349 12.6 125.09970 -9.14527 14706 5309040001 TANAH LEIN NUSA TENGGARA TIMUR 393 Phase 3 99 84 051 18.1 122.88859 -8.58193 14707 5319020008 MBENGAN NUSA TENGGARA TIMUR 18 Phase 2 4 3 396 0.7 120.71616 -8.74994 14708 5306081008 SISI FATUBERAL NUSA TENGGARA TIMUR 42 Phase 2 9 6 327 1.4 125.10470 -9.13186 14709 5309040001 TANAH LEIN NUSA TENGGARA TIMUR 305 Phase 3 77 65 373 14.1 122.89059 -8.58577 14710 5319020008 MBENGAN NUSA TENGGARA TIMUR 322 Phase 2 71 60 279 13.0 120.71597 -8.75157 14711 5306081008 SISI FATUBERAL NUSA TENGGARA TIMUR 127 Phase 2 26 18 278 3.9 125.10403 -9.13100 14712 5309040017 RITAEBANG NUSA TENGGARA TIMUR 94 Phase 3 28 23 772 5.1 122.88172 -8.54898 14713 5319020012 GOLO TOLANG NUSA TENGGARA TIMUR 290 Phase 2 69 58 581 12.6 120.68945 -8.73353 14714 5306081008 SISI FATUBERAL NUSA TENGGARA TIMUR 24 Phase 2 5 3 515 0.8 125.10297 -9.13030 14715 5309040017 RITAEBANG NUSA TENGGARA TIMUR 1 340 Phase 3 122 103 578 22.3 122.88453 -8.52792 14716 5319020012 GOLO TOLANG NUSA TENGGARA TIMUR 151 Phase 2 36 30 564 6.6 120.69213 -8.73284 14717 5306081008 SISI FATUBERAL NUSA TENGGARA TIMUR 292 Phase 2 59 41 477 8.9 125.09398 -9.12839 14718 5309040001 TANAH LEIN NUSA TENGGARA TIMUR 162 Phase 3 41 34 809 7.5 122.89908 -8.58896 14719 5319020012 GOLO TOLANG NUSA TENGGARA TIMUR 151 Phase 2 36 30 564 6.6 120.69522 -8.72900 14720 5306081001 DEBULULIK NUSA TENGGARA TIMUR 208 Phase 2 54 37 962 8.2 125.09074 -9.12861 14721 5309040003 LEWOTANAH OLE NUSA TENGGARA TIMUR 315 Phase 3 90 76 410 16.5 122.92552 -8.58546 14722 5319020012 GOLO TOLANG NUSA TENGGARA TIMUR 54 Phase 2 13 11 037 2.4 120.69698 -8.73003 14723 5306080008 DIRUN NUSA TENGGARA TIMUR 129 Phase 2 30 21 090 4.6 125.08937 -9.12194 14724 5308060001 NILANAPO NUSA TENGGARA TIMUR 608 Phase 3 149 126 501 27.3 123.69269 -8.37080 14725 5319020012 GOLO TOLANG NUSA TENGGARA TIMUR 245 Phase 2 59 50 091 10.8 120.69868 -8.72962 14726 5306080008 DIRUN NUSA TENGGARA TIMUR 42 Phase 2 10 7 030 1.5 125.09128 -9.11502 14727 5307012008 MAWAR NUSA TENGGARA TIMUR 142 Phase 3 34 28 866 6.2 124.30875 -8.31054 14728 5319020012 GOLO TOLANG NUSA TENGGARA TIMUR 115 Phase 2 28 23 772 5.1 120.69873 -8.73122 14729 5306080008 DIRUN NUSA TENGGARA TIMUR 555 Phase 2 127 89 281 19.3 125.09108 -9.11303 14730 5307030010 KELAISI TIMUR NUSA TENGGARA TIMUR 26 Phase 3 7 5 943 1.3 124.72896 -8.27275 14731 5319020012 GOLO TOLANG NUSA TENGGARA TIMUR 80 Phase 2 19 16 131 3.5 120.69984 -8.72270 14732 5306080008 DIRUN NUSA TENGGARA TIMUR 331 Phase 2 76 53 428 11.5 125.09064 -9.10368 14733 5307030010 KELAISI TIMUR NUSA TENGGARA TIMUR 122 Phase 3 30 25 470 5.5 124.72683 -8.27539 14734 5319020013 PAAN LELENG NUSA TENGGARA TIMUR 34 Phase 2 8 6 792 1.5 120.69985 -8.72217 14735 5306080008 DIRUN NUSA TENGGARA TIMUR 318 Phase 2 73 51 319 11.1 125.10084 -9.09694 14736 5310020006 SIKKA NUSA TENGGARA TIMUR 277 Phase 3 74 62 826 13.6 122.21811 -8.74308 14737 5319020013 PAAN LELENG NUSA TENGGARA TIMUR 181 Phase 2 40 33 960 7.3 120.69542 -8.71269 14738 5306080008 DIRUN NUSA TENGGARA TIMUR 46 Phase 2 11 7 733 1.7 125.10544 -9.09762 14739 5307030007 MANMAS NUSA TENGGARA TIMUR 37 Phase 3 12 10 188 2.2 124.73863 -8.29795 14740 5319020013 PAAN LELENG NUSA TENGGARA TIMUR 353 Phase 2 77 65 373 14.1 120.69670 -8.70774 14741 5306080008 DIRUN NUSA TENGGARA TIMUR 973 Phase 2 222 156 066 33.7 125.10585 -9.09598 14742 5307030007 MANMAS NUSA TENGGARA TIMUR 59 Phase 3 18 15 282 3.3 124.74095 -8.29838 14743 5319020013 PAAN LELENG NUSA TENGGARA TIMUR 400 Phase 2 87 73 863 15.9 120.68900 -8.70443 14744 5306080008 DIRUN NUSA TENGGARA TIMUR 194 Phase 2 45 31 635 6.8 125.10580 -9.09363 14745 5307030007 MANMAS NUSA TENGGARA TIMUR 53 Phase 3 16 13 584 2.9 124.74424 -8.30449 14746 5319010008 NGAMPANG MAS NUSA TENGGARA TIMUR 73 Phase 2 15 12 735 2.7 120.68002 -8.70516 14747 5306022001 KEREANA NUSA TENGGARA TIMUR 226 Phase 2 73 51 319 11.1 124.91760 -9.48880 14748 5307030007 MANMAS NUSA TENGGARA TIMUR 19 Phase 3 6 5 094 1.1 124.73562 -8.31327 14749 5319010009 BENTENG RAJA NUSA TENGGARA TIMUR 56 Phase 2 19 16 131 3.5 120.68148 -8.69047 14750 5304071010 HAUNOBENAK NUSA TENGGARA TIMUR 160 Phase 2 50 35 150 7.6 124.53829 -9.95122 14751 5307030009 TAMANAPUI NUSA TENGGARA TIMUR 326 Phase 3 83 70 467 15.2 124.73356 -8.31840 14752 5319010009 BENTENG RAJA NUSA TENGGARA TIMUR 874 Phase 2 285 241 965 52.2 120.68136 -8.68862 14753 5304071010 HAUNOBENAK NUSA TENGGARA TIMUR 108 Phase 2 34 23 902 5.2 124.53641 -9.94773 14754 5307030003 SIDABUI NUSA TENGGARA TIMUR 171 Phase 3 39 33 111 7.1 124.72136 -8.32185 14755 5319010009 BENTENG RAJA NUSA TENGGARA TIMUR 560 Phase 2 183 155 367 33.5 120.67679 -8.68150 14756 5306011016 NABUTAEK NUSA TENGGARA TIMUR 28 Phase 2 7 4 921 1.1 124.71860 -9.62353 14757 5307030003 SIDABUI NUSA TENGGARA TIMUR 21 Phase 3 5 4 245 0.9 124.72022 -8.32121 14758 5319010009 BENTENG RAJA NUSA TENGGARA TIMUR 72 Phase 2 24 20 376 4.4 120.67078 -8.68609 14759 5306011006 NITI NUSA TENGGARA TIMUR 76 Phase 2 18 12 654 2.7 124.71810 -9.62324 Annex II – Demand forecast results Page 56 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 14760 5307030011 SUBO NUSA TENGGARA TIMUR 35 Phase 3 9 7 641 1.6 124.71994 -8.32105 14761 5319010009 BENTENG RAJA NUSA TENGGARA TIMUR 288 Phase 2 94 79 806 17.2 120.66770 -8.69072 14762 5306011006 NITI NUSA TENGGARA TIMUR 290 Phase 2 69 48 507 10.5 124.71496 -9.62290 14763 5307030003 SIDABUI NUSA TENGGARA TIMUR 14 Phase 3 4 3 396 0.7 124.72121 -8.32321 14764 5319050021 POCONG NUSA TENGGARA TIMUR 1 Phase 2 1 849 0.2 120.57315 -8.55842 14765 5303190010 KOLABE NUSA TENGGARA TIMUR 698 Phase 2 171 120 213 25.9 123.86281 -9.47804 14766 5307030003 SIDABUI NUSA TENGGARA TIMUR 27 Phase 3 7 5 943 1.3 124.72565 -8.33352 14767 5319050016 GURUNG TURI NUSA TENGGARA TIMUR 229 Phase 2 52 44 148 9.5 120.57264 -8.55887 14768 5304111002 SKINU NUSA TENGGARA TIMUR 319 Phase 2 102 71 706 15.5 124.76036 -9.75594 14769 5307030003 SIDABUI NUSA TENGGARA TIMUR 103 Phase 3 24 20 376 4.4 124.72802 -8.33352 14770 5313041015 LIA NUSA TENGGARA TIMUR 426 Phase 2 120 101 880 22.0 120.34535 -8.71604 14771 5314070007 MBUEAIN NUSA TENGGARA TIMUR 881 Phase 2 250 175 750 37.9 122.81602 -10.80274 14772 5307030003 SIDABUI NUSA TENGGARA TIMUR 271 Phase 3 62 52 638 11.4 124.72690 -8.33850 14773 5319050007 POCOLIA NUSA TENGGARA TIMUR 121 Phase 2 31 26 319 5.7 120.57539 -8.56300 14774 5306031010 OENAEK NUSA TENGGARA TIMUR 68 Phase 2 21 14 763 3.2 124.85132 -9.41897 14775 5307030002 MAIKANG NUSA TENGGARA TIMUR 215 Phase 3 59 50 091 10.8 124.72178 -8.36072 14776 5319050007 POCOLIA NUSA TENGGARA TIMUR 295 Phase 2 74 62 826 13.6 120.57658 -8.56737 14777 5306031010 OENAEK NUSA TENGGARA TIMUR 89 Phase 2 27 18 981 4.1 124.84980 -9.41593 14778 5307030002 MAIKANG NUSA TENGGARA TIMUR 160 Phase 3 44 37 356 8.1 124.72035 -8.36136 14779 5319050007 POCOLIA NUSA TENGGARA TIMUR 72 Phase 2 18 15 282 3.3 120.58423 -8.57253 14780 5306031006 KAPITANMEO NUSA TENGGARA TIMUR 350 Phase 2 104 73 112 15.8 124.84646 -9.41438 14781 5307030001 PADANG ALANG NUSA TENGGARA TIMUR 1 155 Phase 3 250 212 250 45.8 124.71425 -8.37847 14782 5319050007 POCOLIA NUSA TENGGARA TIMUR 71 Phase 2 18 15 282 3.3 120.58135 -8.57986 14783 5306031006 KAPITANMEO NUSA TENGGARA TIMUR 277 Phase 2 83 58 349 12.6 124.84745 -9.40949 14784 5307030009 TAMANAPUI NUSA TENGGARA TIMUR 131 Phase 3 34 28 866 6.2 124.74165 -8.32171 14785 5319050007 POCOLIA NUSA TENGGARA TIMUR 232 Phase 2 58 49 242 10.6 120.57876 -8.58248 14786 5304060004 KUSI NUSA TENGGARA TIMUR 147 Phase 2 35 24 605 5.3 124.47629 -10.04560 14787 5307021002 MATARU SELATAN NUSA TENGGARA TIMUR 441 Phase 3 135 114 615 24.7 124.69019 -8.39199 14788 5319050006 GOLO NDERU NUSA TENGGARA TIMUR 932 Phase 2 222 188 478 40.7 120.57777 -8.58596 14789 5304060004 KUSI NUSA TENGGARA TIMUR 577 Phase 2 135 94 905 20.5 124.49306 -10.04900 14790 5309020008 KOLAKA NUSA TENGGARA TIMUR 336 Phase 3 82 69 618 15.0 122.96835 -8.17852 14791 5319050005 NGGALAK LELENG NUSA TENGGARA TIMUR 57 Phase 2 16 13 584 2.9 120.57545 -8.59033 14792 5304071002 NOESIU NUSA TENGGARA TIMUR 238 Phase 2 61 42 883 9.3 124.50364 -10.04865 14793 5309020008 KOLAKA NUSA TENGGARA TIMUR 399 Phase 3 97 82 353 17.8 122.97029 -8.15979 14794 5319050006 GOLO NDERU NUSA TENGGARA TIMUR 234 Phase 2 56 47 544 10.3 120.57614 -8.59117 14795 5304071002 NOESIU NUSA TENGGARA TIMUR 227 Phase 2 59 41 477 8.9 124.50356 -10.05127 14796 5309020008 KOLAKA NUSA TENGGARA TIMUR 226 Phase 3 55 46 695 10.1 122.96732 -8.13259 14797 5313041004 SATAR LENDA NUSA TENGGARA TIMUR 433 Phase 2 92 78 108 16.9 120.31245 -8.81994 14798 5303142006 FATUTETA NUSA TENGGARA TIMUR 289 Phase 2 75 52 725 11.4 123.84172 -10.13549 14799 5309020009 LEWOBUNGA NUSA TENGGARA TIMUR 304 Phase 3 81 68 769 14.8 122.94690 -8.11909 14800 5313041004 SATAR LENDA NUSA TENGGARA TIMUR 658 Phase 2 140 118 860 25.6 120.30592 -8.81260 14801 5303142006 FATUTETA NUSA TENGGARA TIMUR 32 Phase 2 9 6 327 1.4 123.84357 -10.13798 14802 5309020020 GEKENG DERAN NUSA TENGGARA TIMUR 186 Phase 3 60 50 940 11.0 122.93441 -8.11025 14803 5313041004 SATAR LENDA NUSA TENGGARA TIMUR 644 Phase 2 137 116 313 25.1 120.30253 -8.81734 14804 5303142006 FATUTETA NUSA TENGGARA TIMUR 167 Phase 2 43 30 229 6.5 123.84554 -10.13982 14805 5309020020 GEKENG DERAN NUSA TENGGARA TIMUR 56 Phase 3 19 16 131 3.5 122.93363 -8.10931 14806 5313041004 SATAR LENDA NUSA TENGGARA TIMUR 240 Phase 2 51 43 299 9.3 120.30253 -8.80686 14807 5304061007 NUNUSUNU NUSA TENGGARA TIMUR 167 Phase 2 39 27 417 5.9 124.40948 -10.08370 14808 5307021006 MATARU UTARA NUSA TENGGARA TIMUR 144 Phase 3 29 24 621 5.3 124.62759 -8.34509 14809 5313130022 LADUR NUSA TENGGARA TIMUR 60 Phase 2 15 12 735 2.7 120.49242 -8.43005 14810 5304061007 NUNUSUNU NUSA TENGGARA TIMUR 81 Phase 2 19 13 357 2.9 124.40554 -10.08176 14811 5307010040 MUNASELI NUSA TENGGARA TIMUR 345 Phase 3 74 62 826 13.6 124.32361 -8.19117 14812 5313130022 LADUR NUSA TENGGARA TIMUR 408 Phase 2 101 85 749 18.5 120.49592 -8.43157 14813 5304061007 NUNUSUNU NUSA TENGGARA TIMUR 156 Phase 2 36 25 308 5.5 124.40301 -10.07224 14814 5309012004 NURRI NUSA TENGGARA TIMUR 77 Phase 3 23 19 527 4.2 122.84129 -8.55854 14815 5318010015 WOEWOLO NUSA TENGGARA TIMUR 410 Phase 2 88 74 712 16.1 121.22947 -8.82927 14816 5304060006 KELLE NUSA TENGGARA TIMUR 1 095 Phase 2 246 172 938 37.3 124.40056 -10.05960 14817 5309012006 RIANG RITA NUSA TENGGARA TIMUR 550 Phase 3 107 90 843 19.6 122.84205 -8.54677 14818 5311071008 MAUTENDA NUSA TENGGARA TIMUR 117 Phase 2 25 21 225 4.6 121.70723 -8.58159 14819 5304051003 OEPLIKI NUSA TENGGARA TIMUR 116 Phase 2 32 22 496 4.9 124.33553 -9.98515 14820 5308050003 BAOLANGU NUSA TENGGARA TIMUR 167 Phase 3 48 40 752 8.8 123.43925 -8.42485 14821 5311071008 MAUTENDA NUSA TENGGARA TIMUR 19 Phase 2 5 4 245 0.9 121.70559 -8.58225 14822 5304051003 OEPLIKI NUSA TENGGARA TIMUR 142 Phase 2 39 27 417 5.9 124.33620 -9.98889 14823 5308050003 BAOLANGU NUSA TENGGARA TIMUR 230 Phase 3 66 56 034 12.1 123.42479 -8.42394 14824 5311071003 RATEWATI NUSA TENGGARA TIMUR 153 Phase 2 32 27 168 5.9 121.70107 -8.58065 14825 5304051003 OEPLIKI NUSA TENGGARA TIMUR 41 Phase 2 12 8 436 1.8 124.33364 -9.99046 14826 5308050004 NUBA MADO NUSA TENGGARA TIMUR 50 Phase 3 16 13 584 2.9 123.42406 -8.42034 14827 5304051003 OEPLIKI NUSA TENGGARA TIMUR 209 Phase 2 57 40 071 8.6 124.33600 -9.99430 14828 5311071003 RATEWATI NUSA TENGGARA TIMUR 298 Phase 2 63 53 487 11.5 121.68844 -8.58086 14829 5307014006 ARAMABA NUSA TENGGARA TIMUR 116 Phase 3 35 29 715 6.4 124.18150 -8.44917 14830 5314040010 LIDAMANU NUSA TENGGARA TIMUR 1 279 Phase 2 363 255 189 55.1 123.14548 -10.74088 14831 5311071003 RATEWATI NUSA TENGGARA TIMUR 120 Phase 2 26 22 074 4.8 121.68528 -8.57647 14832 5307014007 TOANG NUSA TENGGARA TIMUR 379 Phase 3 100 84 900 18.3 124.20605 -8.43493 14833 5304041004 OEHALA NUSA TENGGARA TIMUR 65 Phase 2 17 11 951 2.6 124.18420 -9.93350 14834 5311071006 EKOAE NUSA TENGGARA TIMUR 527 Phase 2 122 103 578 22.3 121.66295 -8.56196 14835 5307014008 TAMAKH NUSA TENGGARA TIMUR 435 Phase 3 86 73 014 15.8 124.20829 -8.42664 14836 5304041004 OEHALA NUSA TENGGARA TIMUR 144 Phase 2 36 25 308 5.5 124.18659 -9.93471 14837 5311071006 EKOAE NUSA TENGGARA TIMUR 122 Phase 2 29 24 621 5.3 121.66106 -8.55690 14838 5307014008 TAMAKH NUSA TENGGARA TIMUR 642 Phase 3 127 107 823 23.3 124.20893 -8.41409 14839 5304041004 OEHALA NUSA TENGGARA TIMUR 35 Phase 2 9 6 327 1.4 124.19024 -9.93685 14840 5311071005 AEMURI NUSA TENGGARA TIMUR 499 Phase 2 110 93 390 20.2 121.64931 -8.54709 14841 5309060019 HURUNG NUSA TENGGARA TIMUR 150 Phase 3 33 28 017 6.0 123.09306 -8.31218 14842 5304041004 OEHALA NUSA TENGGARA TIMUR 62 Phase 2 16 11 248 2.4 124.19010 -9.93964 14843 5311071006 EKOAE NUSA TENGGARA TIMUR 387 Phase 2 90 76 410 16.5 121.64012 -8.56701 14844 5307041008 TARAMANA NUSA TENGGARA TIMUR 224 Phase 3 66 56 034 12.1 124.81918 -8.16463 Annex II – Demand forecast results Page 57 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 14845 5304041004 OEHALA NUSA TENGGARA TIMUR 32 Phase 2 8 5 624 1.2 124.19254 -9.94065 14846 5311071004 MUKUSAKI NUSA TENGGARA TIMUR 487 Phase 2 136 115 464 24.9 121.61611 -8.56510 14847 5307020005 KUIFANA NUSA TENGGARA TIMUR 45 Phase 3 9 7 641 1.6 124.53650 -8.39777 14848 5304041004 OEHALA NUSA TENGGARA TIMUR 221 Phase 2 56 39 368 8.5 124.19441 -9.93739 14849 5311071004 MUKUSAKI NUSA TENGGARA TIMUR 535 Phase 2 150 127 350 27.5 121.61191 -8.56755 14850 5307020007 WAKAPSIR TIMUR NUSA TENGGARA TIMUR 200 Phase 3 43 36 507 7.9 124.54365 -8.40803 14851 5304041004 OEHALA NUSA TENGGARA TIMUR 338 Phase 2 85 59 755 12.9 124.19584 -9.94088 14852 5311071016 KELITEMBU NUSA TENGGARA TIMUR 612 Phase 2 157 133 293 28.8 121.61307 -8.57622 14853 5307020006 WAKAPSIR NUSA TENGGARA TIMUR 394 Phase 3 100 84 900 18.3 124.56046 -8.41251 14854 5304102004 NENOAT NUSA TENGGARA TIMUR 169 Phase 2 46 32 338 7.0 124.68538 -9.88393 14855 5315030010 WAE MOSE NUSA TENGGARA TIMUR 355 Phase 2 93 78 957 17.0 120.17884 -8.71461 14856 5309010015 NILEKNOHENG NUSA TENGGARA TIMUR 237 Phase 3 55 46 695 10.1 122.70766 -8.47000 14857 5304102004 NENOAT NUSA TENGGARA TIMUR 86 Phase 2 24 16 872 3.6 124.68701 -9.88577 14858 5319050007 POCOLIA NUSA TENGGARA TIMUR 110 Phase 2 28 23 772 5.1 120.58874 -8.57268 14859 5309010015 NILEKNOHENG NUSA TENGGARA TIMUR 267 Phase 3 62 52 638 11.4 122.70817 -8.46783 14860 5304102004 NENOAT NUSA TENGGARA TIMUR 290 Phase 2 79 55 537 12.0 124.68916 -9.88737 14861 5319050007 POCOLIA NUSA TENGGARA TIMUR 69 Phase 2 18 15 282 3.3 120.59497 -8.56761 14862 5307020026 MORBA NUSA TENGGARA TIMUR 56 Phase 3 13 11 037 2.4 124.52580 -8.26854 14863 5303190016 LILMUS NUSA TENGGARA TIMUR 120 Phase 2 29 20 387 4.4 123.89581 -9.45239 14864 5319050015 ARUS NUSA TENGGARA TIMUR 444 Phase 2 108 91 692 19.8 120.59631 -8.56846 14865 5307020026 MORBA NUSA TENGGARA TIMUR 111 Phase 3 25 21 225 4.6 124.52628 -8.26544 14866 5303190016 LILMUS NUSA TENGGARA TIMUR 542 Phase 2 129 90 687 19.6 123.89931 -9.44343 14867 5313041009 BEA KONDO NUSA TENGGARA TIMUR 154 Phase 2 36 30 564 6.6 120.37406 -8.74851 14868 5310031016 WOLONTERANG NUSA TENGGARA TIMUR 107 Phase 3 24 20 376 4.4 122.37568 -8.72133 14869 5303190011 BAKUIN NUSA TENGGARA TIMUR 182 Phase 2 46 32 338 7.0 123.90850 -9.43188 14870 5313040017 GARA NUSA TENGGARA TIMUR 69 Phase 2 15 12 735 2.7 120.43920 -8.74977 14871 5307021006 MATARU UTARA NUSA TENGGARA TIMUR 25 Phase 3 5 4 245 0.9 124.62534 -8.35109 14872 5303190011 BAKUIN NUSA TENGGARA TIMUR 94 Phase 2 24 16 872 3.6 123.91490 -9.42969 14873 5318060016 NGGOLONIO NUSA TENGGARA TIMUR 209 Phase 2 58 49 242 10.6 121.23816 -8.50413 14874 5307021006 MATARU UTARA NUSA TENGGARA TIMUR 10 Phase 3 2 1 698 0.4 124.62485 -8.35094 14875 5303190011 BAKUIN NUSA TENGGARA TIMUR 230 Phase 2 57 40 071 8.6 123.91922 -9.42970 14876 5319050014 TANGO MOLAS NUSA TENGGARA TIMUR 73 Phase 2 18 15 282 3.3 120.59879 -8.57290 14877 5307021006 MATARU UTARA NUSA TENGGARA TIMUR 70 Phase 3 14 11 886 2.6 124.61923 -8.35246 14878 5303192001 NUNUANAH NUSA TENGGARA TIMUR 136 Phase 2 32 22 496 4.9 123.93085 -9.42513 14879 5319050014 TANGO MOLAS NUSA TENGGARA TIMUR 115 Phase 2 28 23 772 5.1 120.60731 -8.56820 14880 5307021006 MATARU UTARA NUSA TENGGARA TIMUR 169 Phase 3 34 28 866 6.2 124.61776 -8.35514 14881 5303192001 NUNUANAH NUSA TENGGARA TIMUR 284 Phase 2 65 45 695 9.9 123.93769 -9.41992 14882 5319050014 TANGO MOLAS NUSA TENGGARA TIMUR 513 Phase 2 122 103 578 22.3 120.60977 -8.57164 14883 5307021006 MATARU UTARA NUSA TENGGARA TIMUR 128 Phase 3 26 22 074 4.8 124.61805 -8.35066 14884 5303192001 NUNUANAH NUSA TENGGARA TIMUR 626 Phase 2 144 101 232 21.8 123.94174 -9.41331 14885 5319050014 TANGO MOLAS NUSA TENGGARA TIMUR 149 Phase 2 36 30 564 6.6 120.61393 -8.56824 14886 5307021006 MATARU UTARA NUSA TENGGARA TIMUR 13 Phase 3 3 2 547 0.5 124.61183 -8.34600 14887 5303192001 NUNUANAH NUSA TENGGARA TIMUR 420 Phase 2 97 68 191 14.7 123.94453 -9.40888 14888 5319050014 TANGO MOLAS NUSA TENGGARA TIMUR 339 Phase 2 81 68 769 14.8 120.61958 -8.56812 14889 5307021007 MATARU BARAT NUSA TENGGARA TIMUR 109 Phase 3 22 18 678 4.0 124.61117 -8.34594 14890 5303192002 KIFU NUSA TENGGARA TIMUR 77 Phase 2 14 9 842 2.1 123.98119 -9.35559 14891 5313041008 HILIHINTIR NUSA TENGGARA TIMUR 208 Phase 2 42 35 658 7.7 120.39106 -8.78613 14892 5307021007 MATARU BARAT NUSA TENGGARA TIMUR 86 Phase 3 17 14 433 3.1 124.60738 -8.34839 14893 5303192002 KIFU NUSA TENGGARA TIMUR 808 Phase 2 142 99 826 21.5 123.98342 -9.35579 14894 5313041008 HILIHINTIR NUSA TENGGARA TIMUR 169 Phase 2 34 28 866 6.2 120.39084 -8.79096 14895 5307021007 MATARU BARAT NUSA TENGGARA TIMUR 233 Phase 3 46 39 054 8.4 124.60334 -8.34600 14896 5303192002 KIFU NUSA TENGGARA TIMUR 113 Phase 2 20 14 060 3.0 123.98598 -9.35126 14897 5313041008 HILIHINTIR NUSA TENGGARA TIMUR 124 Phase 2 25 21 225 4.6 120.39225 -8.79506 14898 5307021007 MATARU BARAT NUSA TENGGARA TIMUR 48 Phase 3 10 8 490 1.8 124.60563 -8.34064 14899 5303192002 KIFU NUSA TENGGARA TIMUR 132 Phase 2 24 16 872 3.6 123.98922 -9.35454 14900 5313040009 TAL NUSA TENGGARA TIMUR 179 Phase 2 40 33 960 7.3 120.39830 -8.79748 14901 5307021007 MATARU BARAT NUSA TENGGARA TIMUR 144 Phase 3 29 24 621 5.3 124.61085 -8.33884 14902 5303192003 NETEMNANU SELATAN NUSA TENGGARA TIMUR 213 Phase 2 51 35 853 7.7 123.99148 -9.35145 14903 5313041008 HILIHINTIR NUSA TENGGARA TIMUR 769 Phase 2 155 131 595 28.4 120.39345 -8.80993 14904 5308040005 LERAHINGA NUSA TENGGARA TIMUR 88 Phase 3 24 20 376 4.4 123.59687 -8.39008 14905 5303192003 NETEMNANU SELATAN NUSA TENGGARA TIMUR 203 Phase 2 48 33 744 7.3 124.01492 -9.35137 14906 5315040017 KOLANG NUSA TENGGARA TIMUR 14 Phase 2 4 3 396 0.7 120.24986 -8.56497 14907 5308040005 LERAHINGA NUSA TENGGARA TIMUR 42 Phase 3 12 10 188 2.2 123.59609 -8.39173 14908 5303192003 NETEMNANU SELATAN NUSA TENGGARA TIMUR 660 Phase 2 156 109 668 23.7 124.01804 -9.35151 14909 5315040017 KOLANG NUSA TENGGARA TIMUR 66 Phase 2 15 12 735 2.7 120.25053 -8.56561 14910 5308040014 LAMALELA NUSA TENGGARA TIMUR 85 Phase 3 26 22 074 4.8 123.59748 -8.39186 14911 5303192003 NETEMNANU SELATAN NUSA TENGGARA TIMUR 948 Phase 2 224 157 472 34.0 124.02271 -9.35297 14912 5315040017 KOLANG NUSA TENGGARA TIMUR 151 Phase 2 34 28 866 6.2 120.25198 -8.56601 14913 5308040016 BANITOBO NUSA TENGGARA TIMUR 383 Phase 3 102 86 598 18.7 123.57885 -8.40883 14914 5303192004 NETEMNANU UTARA NUSA TENGGARA TIMUR 188 Phase 2 44 30 932 6.7 124.03239 -9.35353 14915 5315040019 GOLO LEWE NUSA TENGGARA TIMUR 140 Phase 2 29 24 621 5.3 120.23681 -8.56238 14916 5308040005 LERAHINGA NUSA TENGGARA TIMUR 16 Phase 3 5 4 245 0.9 123.57838 -8.40870 14917 5303192004 NETEMNANU UTARA NUSA TENGGARA TIMUR 36 Phase 2 9 6 327 1.4 124.03365 -9.35648 14918 5315040019 GOLO LEWE NUSA TENGGARA TIMUR 143 Phase 2 30 25 470 5.5 120.23797 -8.56096 14919 5308040014 LAMALELA NUSA TENGGARA TIMUR 300 Phase 3 90 76 410 16.5 123.61981 -8.38584 14920 5303192004 NETEMNANU UTARA NUSA TENGGARA TIMUR 1 531 Phase 2 354 248 862 53.7 124.03582 -9.35505 14921 5312011008 NARUWOLO II NUSA TENGGARA TIMUR 172 Phase 2 40 33 960 7.3 121.02024 -8.92976 14922 5308060006 MAHAL II NUSA TENGGARA TIMUR 296 Phase 3 86 73 014 15.8 123.77976 -8.27665 14923 5303190011 BAKUIN NUSA TENGGARA TIMUR 470 Phase 2 117 82 251 17.7 123.92182 -9.44223 14924 5312030001 WOGOWELA NUSA TENGGARA TIMUR 191 Phase 2 45 38 205 8.2 121.03341 -8.94859 14925 5309020021 ARAN SINA NUSA TENGGARA TIMUR 239 Phase 3 62 52 638 11.4 122.81641 -8.10074 14926 5306022001 KEREANA NUSA TENGGARA TIMUR 68 Phase 2 22 15 466 3.3 124.91725 -9.49287 14927 5312030001 WOGOWELA NUSA TENGGARA TIMUR 188 Phase 2 44 37 356 8.1 121.04791 -8.94634 14928 5309020021 ARAN SINA NUSA TENGGARA TIMUR 34 Phase 3 9 7 641 1.6 122.81552 -8.09928 14929 5306022001 KEREANA NUSA TENGGARA TIMUR 152 Phase 2 49 34 447 7.4 124.91275 -9.49376 Annex II – Demand forecast results Page 58 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 14930 5312030001 WOGOWELA NUSA TENGGARA TIMUR 135 Phase 2 32 27 168 5.9 121.04830 -8.94709 14931 5309020021 ARAN SINA NUSA TENGGARA TIMUR 174 Phase 3 45 38 205 8.2 122.83319 -8.09853 14932 5305012002 OETULU NUSA TENGGARA TIMUR 278 Phase 2 80 56 240 12.1 124.37042 -9.50241 14933 5312030002 BOBA NUSA TENGGARA TIMUR 674 Phase 2 161 136 689 29.5 121.05358 -8.94251 14934 5309020021 ARAN SINA NUSA TENGGARA TIMUR 124 Phase 3 32 27 168 5.9 122.83433 -8.09648 14935 5305012002 OETULU NUSA TENGGARA TIMUR 115 Phase 2 34 23 902 5.2 124.36877 -9.50871 14936 5312030002 BOBA NUSA TENGGARA TIMUR 192 Phase 2 46 39 054 8.4 121.05525 -8.94199 14937 5309020018 LATON LIWO NUSA TENGGARA TIMUR 110 Phase 3 27 22 923 4.9 122.84403 -8.09608 14938 5305012002 OETULU NUSA TENGGARA TIMUR 341 Phase 2 99 69 597 15.0 124.36903 -9.51426 14939 5312030002 BOBA NUSA TENGGARA TIMUR 205 Phase 2 49 41 601 9.0 121.05926 -8.94446 14940 5309020018 LATON LIWO NUSA TENGGARA TIMUR 319 Phase 3 76 64 524 13.9 122.85163 -8.07721 14941 5304071010 HAUNOBENAK NUSA TENGGARA TIMUR 153 Phase 2 47 33 041 7.1 124.54481 -9.95177 14942 5312030002 BOBA NUSA TENGGARA TIMUR 107 Phase 2 26 22 074 4.8 121.05758 -8.94633 14943 5309020019 PATISIRAWALANG NUSA TENGGARA TIMUR 1 029 Phase 3 163 138 387 29.9 122.87593 -8.09643 14944 5306021015 BEANENO NUSA TENGGARA TIMUR 315 Phase 2 79 55 537 12.0 124.84494 -9.48782 14945 5319050014 TANGO MOLAS NUSA TENGGARA TIMUR 335 Phase 2 80 67 920 14.7 120.61044 -8.56414 14946 5307030007 MANMAS NUSA TENGGARA TIMUR 127 Phase 3 39 33 111 7.1 124.74649 -8.30400 14947 5306021015 BEANENO NUSA TENGGARA TIMUR 204 Phase 2 51 35 853 7.7 124.84426 -9.49261 14948 5312030006 TAKATUNGA NUSA TENGGARA TIMUR 175 Phase 2 43 36 507 7.9 121.12998 -8.84887 14949 5310042011 NATARMAGE NUSA TENGGARA TIMUR 334 Phase 3 81 68 769 14.8 122.58469 -8.63984 14950 5306021015 BEANENO NUSA TENGGARA TIMUR 30 Phase 2 8 5 624 1.2 124.83249 -9.49634 14951 5318010002 BELA NUSA TENGGARA TIMUR 299 Phase 2 75 63 675 13.7 121.14370 -8.84573 14952 5307021002 MATARU SELATAN NUSA TENGGARA TIMUR 245 Phase 3 75 63 675 13.7 124.67228 -8.38952 14953 5306021004 NAIBONE NUSA TENGGARA TIMUR 106 Phase 2 27 18 981 4.1 124.82499 -9.50051 14954 5318010003 WOLOKISA NUSA TENGGARA TIMUR 170 Phase 2 39 33 111 7.1 121.15038 -8.86022 14955 5307030008 SILAIPUI NUSA TENGGARA TIMUR 33 Phase 3 9 7 641 1.6 124.75359 -8.31151 14956 5306021004 NAIBONE NUSA TENGGARA TIMUR 676 Phase 2 172 120 916 26.1 124.82326 -9.49517 14957 5318010003 WOLOKISA NUSA TENGGARA TIMUR 62 Phase 2 14 11 886 2.6 121.15075 -8.86257 14958 5307030008 SILAIPUI NUSA TENGGARA TIMUR 112 Phase 3 30 25 470 5.5 124.76125 -8.31395 14959 5306021004 NAIBONE NUSA TENGGARA TIMUR 9 Phase 2 3 2 109 0.5 124.81918 -9.50031 14960 5318010002 BELA NUSA TENGGARA TIMUR 329 Phase 2 83 70 467 15.2 121.14209 -8.86648 14961 5307030008 SILAIPUI NUSA TENGGARA TIMUR 38 Phase 3 11 9 339 2.0 124.76193 -8.31538 14962 5306021004 NAIBONE NUSA TENGGARA TIMUR 9 Phase 2 3 2 109 0.5 124.81883 -9.50026 14963 5318010002 BELA NUSA TENGGARA TIMUR 272 Phase 2 68 57 732 12.5 121.14204 -8.86816 14964 5307030008 SILAIPUI NUSA TENGGARA TIMUR 49 Phase 3 13 11 037 2.4 124.76412 -8.31426 14965 5306021004 NAIBONE NUSA TENGGARA TIMUR 61 Phase 2 16 11 248 2.4 124.81890 -9.49905 14966 5318010001 AEWOE NUSA TENGGARA TIMUR 14 Phase 2 3 2 547 0.5 121.14229 -8.86820 14967 5307030006 LELLA NUSA TENGGARA TIMUR 17 Phase 3 5 4 245 0.9 124.77299 -8.29120 14968 5306023004 KUFEU NUSA TENGGARA TIMUR 901 Phase 2 213 149 739 32.3 124.80244 -9.50547 14969 5318010003 WOLOKISA NUSA TENGGARA TIMUR 360 Phase 2 81 68 769 14.8 121.15401 -8.86190 14970 5307030006 LELLA NUSA TENGGARA TIMUR 74 Phase 3 21 17 829 3.8 124.77446 -8.28990 14971 5314050004 SONIMANU NUSA TENGGARA TIMUR 456 Phase 2 148 104 044 22.4 123.28656 -10.71871 14972 5318010004 WULIWALO NUSA TENGGARA TIMUR 303 Phase 2 70 59 430 12.8 121.15995 -8.86672 14973 5307030006 LELLA NUSA TENGGARA TIMUR 53 Phase 3 15 12 735 2.7 124.77677 -8.29219 14974 5314050003 LENUPETU NUSA TENGGARA TIMUR 423 Phase 2 113 79 439 17.1 123.26296 -10.72549 14975 5318010004 WULIWALO NUSA TENGGARA TIMUR 287 Phase 2 66 56 034 12.1 121.15936 -8.85366 14976 5307030006 LELLA NUSA TENGGARA TIMUR 30 Phase 3 9 7 641 1.6 124.78350 -8.28923 14977 5314050005 OEBAU NUSA TENGGARA TIMUR 897 Phase 2 267 187 701 40.5 123.26035 -10.69810 14978 5315040020 TUENG NUSA TENGGARA TIMUR 66 Phase 2 15 12 735 2.7 120.24068 -8.55296 14979 5307030006 LELLA NUSA TENGGARA TIMUR 96 Phase 3 27 22 923 4.9 124.78667 -8.28930 14980 5314050002 BATULILOK NUSA TENGGARA TIMUR 629 Phase 2 176 123 728 26.7 123.24138 -10.72943 14981 5315040020 TUENG NUSA TENGGARA TIMUR 78 Phase 2 18 15 282 3.3 120.23291 -8.54834 14982 5307030006 LELLA NUSA TENGGARA TIMUR 123 Phase 3 34 28 866 6.2 124.79689 -8.29140 14983 5306022001 KEREANA NUSA TENGGARA TIMUR 218 Phase 2 70 49 210 10.6 124.90690 -9.49757 14984 5315050003 GOLO LAJANG NUSA TENGGARA TIMUR 120 Phase 2 26 22 074 4.8 120.22686 -8.54197 14985 5307041002 LIPPANG NUSA TENGGARA TIMUR 35 Phase 3 10 8 490 1.8 124.80047 -8.27529 14986 5306010016 LASAEN NUSA TENGGARA TIMUR 235 Phase 2 58 40 774 8.8 124.91851 -9.62677 14987 5315050003 GOLO LAJANG NUSA TENGGARA TIMUR 102 Phase 2 22 18 678 4.0 120.22302 -8.53415 14988 5307041002 LIPPANG NUSA TENGGARA TIMUR 33 Phase 3 9 7 641 1.6 124.81267 -8.27332 14989 5304042001 LAKAT NUSA TENGGARA TIMUR 338 Phase 2 85 59 755 12.9 124.41399 -9.85825 14990 5315050003 GOLO LAJANG NUSA TENGGARA TIMUR 62 Phase 2 14 11 886 2.6 120.23256 -8.52134 14991 5307041002 LIPPANG NUSA TENGGARA TIMUR 153 Phase 3 41 34 809 7.5 124.81541 -8.27165 14992 5304042002 SUPUL NUSA TENGGARA TIMUR 40 Phase 2 12 8 436 1.8 124.43180 -9.86892 14993 5315050003 GOLO LAJANG NUSA TENGGARA TIMUR 230 Phase 2 49 41 601 9.0 120.23397 -8.52123 14994 5307041002 LIPPANG NUSA TENGGARA TIMUR 199 Phase 3 53 44 997 9.7 124.81593 -8.26491 14995 5304042001 LAKAT NUSA TENGGARA TIMUR 418 Phase 2 105 73 815 15.9 124.43163 -9.86919 14996 5315050003 GOLO LAJANG NUSA TENGGARA TIMUR 124 Phase 2 27 22 923 4.9 120.23436 -8.51974 14997 5307041002 LIPPANG NUSA TENGGARA TIMUR 56 Phase 3 15 12 735 2.7 124.81945 -8.26231 14998 5304042001 LAKAT NUSA TENGGARA TIMUR 649 Phase 2 163 114 589 24.7 124.41362 -9.89235 14999 5315050003 GOLO LAJANG NUSA TENGGARA TIMUR 230 Phase 2 49 41 601 9.0 120.23615 -8.51366 15000 5307041001 PIDO NUSA TENGGARA TIMUR 166 Phase 3 41 34 809 7.5 124.82924 -8.26299 15001 5304042007 TUBMONAS NUSA TENGGARA TIMUR 1 246 Phase 2 337 236 911 51.1 124.43470 -9.90547 15002 5315050003 GOLO LAJANG NUSA TENGGARA TIMUR 552 Phase 2 117 99 333 21.4 120.22994 -8.51332 15003 5307041001 PIDO NUSA TENGGARA TIMUR 16 Phase 3 4 3 396 0.7 124.83117 -8.26325 15004 5306023006 TUNABESI NUSA TENGGARA TIMUR 826 Phase 2 235 165 205 35.6 124.77885 -9.49656 15005 5315050003 GOLO LAJANG NUSA TENGGARA TIMUR 200 Phase 2 43 36 507 7.9 120.21675 -8.53475 15006 5307041001 PIDO NUSA TENGGARA TIMUR 241 Phase 3 59 50 091 10.8 124.83213 -8.26244 15007 5304102008 PUTUN NUSA TENGGARA TIMUR 111 Phase 2 41 28 823 6.2 124.65618 -9.86618 15008 5315050003 GOLO LAJANG NUSA TENGGARA TIMUR 331 Phase 2 70 59 430 12.8 120.21318 -8.52631 15009 5307041001 PIDO NUSA TENGGARA TIMUR 35 Phase 3 9 7 641 1.6 124.83157 -8.26559 15010 5304100012 KUALEU NUSA TENGGARA TIMUR 199 Phase 2 50 35 150 7.6 124.65347 -9.86010 15011 5315050003 GOLO LAJANG NUSA TENGGARA TIMUR 166 Phase 2 36 30 564 6.6 120.20837 -8.51617 15012 5307041001 PIDO NUSA TENGGARA TIMUR 158 Phase 3 39 33 111 7.1 124.83355 -8.26668 15013 5304060007 BASMUTI NUSA TENGGARA TIMUR 216 Phase 2 51 35 853 7.7 124.39481 -10.01168 15014 5315050003 GOLO LAJANG NUSA TENGGARA TIMUR 197 Phase 2 42 35 658 7.7 120.20779 -8.51448 Annex II – Demand forecast results Page 59 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 15015 5307041001 PIDO NUSA TENGGARA TIMUR 92 Phase 3 23 19 527 4.2 124.83537 -8.26588 15016 5304060007 BASMUTI NUSA TENGGARA TIMUR 534 Phase 2 124 87 172 18.8 124.38880 -10.00360 15017 5315050004 PACAR NUSA TENGGARA TIMUR 227 Phase 2 41 34 809 7.5 120.19967 -8.51397 15018 5307041001 PIDO NUSA TENGGARA TIMUR 208 Phase 3 51 43 299 9.3 124.84462 -8.26018 15019 5304060009 LASI NUSA TENGGARA TIMUR 609 Phase 2 147 103 341 22.3 124.42384 -9.95522 15020 5315050004 PACAR NUSA TENGGARA TIMUR 558 Phase 2 100 84 900 18.3 120.19920 -8.51699 15021 5307041001 PIDO NUSA TENGGARA TIMUR 65 Phase 3 16 13 584 2.9 124.84891 -8.25423 15022 5305060006 TUALENE NUSA TENGGARA TIMUR 12 Phase 2 4 2 812 0.6 124.81781 -9.30360 15023 5315050002 COMPANG NUSA TENGGARA TIMUR 100 Phase 2 21 17 829 3.8 120.20049 -8.52019 15024 5307041001 PIDO NUSA TENGGARA TIMUR 40 Phase 3 10 8 490 1.8 124.84782 -8.25338 15025 5314070008 NDAO NUSE NUSA TENGGARA TIMUR 3 087 Phase 2 753 529 359 114.2 122.70834 -10.80444 15026 5315050002 COMPANG NUSA TENGGARA TIMUR 217 Phase 2 45 38 205 8.2 120.20086 -8.52118 15027 5307040011 BELEMANA NUSA TENGGARA TIMUR 155 Phase 3 42 35 658 7.7 124.89324 -8.25558 15028 5304050010 BATNUN NUSA TENGGARA TIMUR 140 Phase 2 36 25 308 5.5 124.24142 -10.07708 15029 5315050004 PACAR NUSA TENGGARA TIMUR 254 Phase 2 46 39 054 8.4 120.19675 -8.51059 15030 5307040012 PADANG PANJANG NUSA TENGGARA TIMUR 700 Phase 3 177 150 273 32.4 124.90005 -8.23453 15031 5304050010 BATNUN NUSA TENGGARA TIMUR 472 Phase 2 121 85 063 18.4 124.24367 -10.07026 15032 5315050004 PACAR NUSA TENGGARA TIMUR 191 Phase 2 34 28 866 6.2 120.19581 -8.50900 15033 5307040011 BELEMANA NUSA TENGGARA TIMUR 138 Phase 3 38 32 262 7.0 124.91625 -8.25219 15034 5306021016 MANUMUTIN SILOLE NUSA TENGGARA TIMUR 107 Phase 2 31 21 793 4.7 124.80361 -9.52095 15035 5315050004 PACAR NUSA TENGGARA TIMUR 201 Phase 2 36 30 564 6.6 120.19537 -8.50392 15036 5307040011 BELEMANA NUSA TENGGARA TIMUR 87 Phase 3 24 20 376 4.4 124.91767 -8.25546 15037 5306021016 MANUMUTIN SILOLE NUSA TENGGARA TIMUR 55 Phase 2 16 11 248 2.4 124.80910 -9.53646 15038 5315050004 PACAR NUSA TENGGARA TIMUR 594 Phase 2 106 89 994 19.4 120.19858 -8.49802 15039 5307040010 TANGLAPUI NUSA TENGGARA TIMUR 137 Phase 3 34 28 866 6.2 124.93069 -8.25876 15040 5306020002 KAKANIUK NUSA TENGGARA TIMUR 221 Phase 2 57 40 071 8.6 124.81504 -9.54341 15041 5315050004 PACAR NUSA TENGGARA TIMUR 749 Phase 2 134 113 766 24.5 120.19634 -8.49421 15042 5307040010 TANGLAPUI NUSA TENGGARA TIMUR 237 Phase 3 59 50 091 10.8 124.92774 -8.26531 15043 5306021005 FATUARUIN NUSA TENGGARA TIMUR 136 Phase 2 37 26 011 5.6 124.81956 -9.53991 15044 5315050004 PACAR NUSA TENGGARA TIMUR 78 Phase 2 14 11 886 2.6 120.19644 -8.49151 15045 5307040010 TANGLAPUI NUSA TENGGARA TIMUR 153 Phase 3 38 32 262 7.0 124.93298 -8.25772 15046 5306021005 FATUARUIN NUSA TENGGARA TIMUR 51 Phase 2 14 9 842 2.1 124.82712 -9.53385 15047 5315050004 PACAR NUSA TENGGARA TIMUR 558 Phase 2 100 84 900 18.3 120.19813 -8.49096 15048 5307040010 TANGLAPUI NUSA TENGGARA TIMUR 169 Phase 3 42 35 658 7.7 124.95320 -8.26491 15049 5306021005 FATUARUIN NUSA TENGGARA TIMUR 716 Phase 2 194 136 382 29.4 124.82932 -9.53008 15050 5315050004 PACAR NUSA TENGGARA TIMUR 352 Phase 2 63 53 487 11.5 120.20123 -8.48254 15051 5307040010 TANGLAPUI NUSA TENGGARA TIMUR 202 Phase 3 50 42 450 9.2 124.95623 -8.26735 15052 5306021005 FATUARUIN NUSA TENGGARA TIMUR 117 Phase 2 32 22 496 4.9 124.83465 -9.52510 15053 5315050005 KOMBO NUSA TENGGARA TIMUR 216 Phase 2 60 50 940 11.0 120.20792 -8.46658 15054 5308011002 LAMALERA A NUSA TENGGARA TIMUR 257 Phase 3 29 24 621 5.3 123.40305 -8.57869 15055 5306021017 BUILARAN NUSA TENGGARA TIMUR 983 Phase 2 289 203 167 43.8 124.84268 -9.52750 15056 5315050005 KOMBO NUSA TENGGARA TIMUR 571 Phase 2 157 133 293 28.8 120.20566 -8.45411 15057 5308011002 LAMALERA A NUSA TENGGARA TIMUR 35 Phase 3 10 8 490 1.8 123.39352 -8.58323 15058 5303191006 SOLIU NUSA TENGGARA TIMUR 201 Phase 2 51 35 853 7.7 123.77001 -9.55626 15059 5315050005 KOMBO NUSA TENGGARA TIMUR 248 Phase 2 68 57 732 12.5 120.21895 -8.46445 15060 5308011002 LAMALERA A NUSA TENGGARA TIMUR 157 Phase 3 45 38 205 8.2 123.38858 -8.58049 15061 5303191005 OELFATU NUSA TENGGARA TIMUR 489 Phase 2 119 83 657 18.1 123.76637 -9.56271 15062 5315050005 KOMBO NUSA TENGGARA TIMUR 171 Phase 2 47 39 903 8.6 120.23822 -8.45585 15063 5308011002 LAMALERA A NUSA TENGGARA TIMUR 47 Phase 3 14 11 886 2.6 123.38649 -8.58024 15064 5304103003 FATUMNASI NUSA TENGGARA TIMUR 217 Phase 2 57 40 071 8.6 124.65731 -9.74575 15065 5315050005 KOMBO NUSA TENGGARA TIMUR 393 Phase 2 108 91 692 19.8 120.23806 -8.44393 15066 5307041008 TARAMANA NUSA TENGGARA TIMUR 88 Phase 3 26 22 074 4.8 124.82283 -8.16548 15067 5304103002 NOEBANA NUSA TENGGARA TIMUR 269 Phase 2 72 50 616 10.9 124.65650 -9.75649 15068 5315050005 KOMBO NUSA TENGGARA TIMUR 170 Phase 2 47 39 903 8.6 120.23161 -8.43420 15069 5307040010 TANGLAPUI NUSA TENGGARA TIMUR 56 Phase 3 14 11 886 2.6 124.95862 -8.26858 15070 5304103002 NOEBANA NUSA TENGGARA TIMUR 120 Phase 2 32 22 496 4.9 124.64592 -9.76269 15071 5315050011 ROKAP NUSA TENGGARA TIMUR 42 Phase 2 14 11 886 2.6 120.23156 -8.43397 15072 5309062006 KENOTAN NUSA TENGGARA TIMUR 66 Phase 3 16 13 584 2.9 123.15417 -8.32132 15073 5304103002 NOEBANA NUSA TENGGARA TIMUR 655 Phase 2 175 123 025 26.5 124.63766 -9.76803 15074 5315050011 ROKAP NUSA TENGGARA TIMUR 346 Phase 2 108 91 692 19.8 120.23442 -8.41913 15075 5307020006 WAKAPSIR NUSA TENGGARA TIMUR 244 Phase 3 62 52 638 11.4 124.56784 -8.43486 15076 5306022001 KEREANA NUSA TENGGARA TIMUR 367 Phase 2 118 82 954 17.9 124.90326 -9.50228 15077 5315050007 REGO NUSA TENGGARA TIMUR 312 Phase 2 81 68 769 14.8 120.24671 -8.41747 15078 5307021001 LAKATULI NUSA TENGGARA TIMUR 26 Phase 3 7 5 943 1.3 124.56871 -8.43459 15079 5320060001 HUWAGA NUSA TENGGARA TIMUR 480 Phase 2 124 87 172 18.8 121.98193 -10.53272 15080 5315050007 REGO NUSA TENGGARA TIMUR 884 Phase 2 230 195 270 42.1 120.25623 -8.42654 15081 5310050006 IAN TENA NUSA TENGGARA TIMUR 110 Phase 3 28 23 772 5.1 122.28855 -8.70094 15082 5306013006 TAABA NUSA TENGGARA TIMUR 242 Phase 2 65 45 695 9.9 124.82973 -9.65643 15083 5315050007 REGO NUSA TENGGARA TIMUR 212 Phase 2 56 47 544 10.3 120.26132 -8.42053 15084 5309011004 KONGA NUSA TENGGARA TIMUR 19 Phase 3 5 4 245 0.9 122.78200 -8.43952 15085 5303191005 OELFATU NUSA TENGGARA TIMUR 147 Phase 2 36 25 308 5.5 123.75926 -9.56620 15086 5315050007 REGO NUSA TENGGARA TIMUR 471 Phase 2 123 104 427 22.5 120.26158 -8.39799 15087 5309011004 KONGA NUSA TENGGARA TIMUR 123 Phase 3 28 23 772 5.1 122.78430 -8.44269 15088 5303191005 OELFATU NUSA TENGGARA TIMUR 901 Phase 2 218 153 254 33.1 123.75985 -9.57303 15089 5315050007 REGO NUSA TENGGARA TIMUR 340 Phase 2 89 75 561 16.3 120.27225 -8.39555 15090 5309011004 KONGA NUSA TENGGARA TIMUR 26 Phase 3 6 5 094 1.1 122.78203 -8.43775 15091 5303191001 SAUKIBE NUSA TENGGARA TIMUR 166 Phase 2 40 28 120 6.1 123.75970 -9.59150 15092 5315050006 WONTONG NUSA TENGGARA TIMUR 1 941 Phase 2 389 330 261 71.3 120.27442 -8.39464 15093 5307040009 TANGLAPUI TIMUR NUSA TENGGARA TIMUR 283 Phase 3 76 64 524 13.9 124.98454 -8.24666 15094 5303191001 SAUKIBE NUSA TENGGARA TIMUR 72 Phase 2 17 11 951 2.6 123.76113 -9.59606 15095 5315050006 WONTONG NUSA TENGGARA TIMUR 398 Phase 2 80 67 920 14.7 120.26558 -8.43585 15096 5307040009 TANGLAPUI TIMUR NUSA TENGGARA TIMUR 126 Phase 3 34 28 866 6.2 124.99058 -8.24943 15097 5303191001 SAUKIBE NUSA TENGGARA TIMUR 192 Phase 2 46 32 338 7.0 123.76447 -9.59562 15098 5315050006 WONTONG NUSA TENGGARA TIMUR 841 Phase 2 169 143 481 31.0 120.26768 -8.44020 15099 5307040009 TANGLAPUI TIMUR NUSA TENGGARA TIMUR 24 Phase 3 7 5 943 1.3 124.99132 -8.25016 Annex II – Demand forecast results Page 60 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 15100 5303191001 SAUKIBE NUSA TENGGARA TIMUR 231 Phase 2 55 38 665 8.3 123.76624 -9.59790 15101 5315050005 KOMBO NUSA TENGGARA TIMUR 275 Phase 2 76 64 524 13.9 120.20774 -8.44446 15102 5307040006 KOLANA SELATAN NUSA TENGGARA TIMUR 179 Phase 3 42 35 658 7.7 125.00917 -8.27699 15103 5303191001 SAUKIBE NUSA TENGGARA TIMUR 583 Phase 2 138 97 014 20.9 123.77093 -9.59824 15104 5315050005 KOMBO NUSA TENGGARA TIMUR 694 Phase 2 190 161 310 34.8 120.21681 -8.44968 15105 5307040006 KOLANA SELATAN NUSA TENGGARA TIMUR 161 Phase 3 37 31 413 6.8 125.00942 -8.28193 15106 5303191001 SAUKIBE NUSA TENGGARA TIMUR 142 Phase 2 34 23 902 5.2 123.77229 -9.59806 15107 5315050012 RABA NUSA TENGGARA TIMUR 215 Phase 2 46 39 054 8.4 120.20831 -8.42521 15108 5307040006 KOLANA SELATAN NUSA TENGGARA TIMUR 48 Phase 3 12 10 188 2.2 125.03248 -8.26861 15109 5303191001 SAUKIBE NUSA TENGGARA TIMUR 64 Phase 2 16 11 248 2.4 123.77563 -9.60015 15110 5315050012 RABA NUSA TENGGARA TIMUR 1 022 Phase 2 218 185 082 39.9 120.20938 -8.42478 15111 5307040006 KOLANA SELATAN NUSA TENGGARA TIMUR 303 Phase 3 70 59 430 12.8 125.03478 -8.27152 15112 5303191003 TIMAU NUSA TENGGARA TIMUR 209 Phase 2 50 35 150 7.6 123.78276 -9.59855 15113 5315050004 PACAR NUSA TENGGARA TIMUR 273 Phase 2 49 41 601 9.0 120.18923 -8.51297 15114 5307040006 KOLANA SELATAN NUSA TENGGARA TIMUR 88 Phase 3 21 17 829 3.8 125.03612 -8.26574 15115 5303191003 TIMAU NUSA TENGGARA TIMUR 305 Phase 2 72 50 616 10.9 123.78193 -9.59290 15116 5319050014 TANGO MOLAS NUSA TENGGARA TIMUR 297 Phase 2 71 60 279 13.0 120.61157 -8.56033 15117 5307040006 KOLANA SELATAN NUSA TENGGARA TIMUR 60 Phase 3 14 11 886 2.6 125.04344 -8.28250 15118 5303191003 TIMAU NUSA TENGGARA TIMUR 348 Phase 2 82 57 646 12.4 123.78578 -9.59207 15119 5319050013 GOLO LERO NUSA TENGGARA TIMUR 75 Phase 2 23 19 527 4.2 120.61599 -8.55683 15120 5307040006 KOLANA SELATAN NUSA TENGGARA TIMUR 150 Phase 3 35 29 715 6.4 125.04318 -8.28562 15121 5303191003 TIMAU NUSA TENGGARA TIMUR 243 Phase 2 58 40 774 8.8 123.78875 -9.59450 15122 5319050014 TANGO MOLAS NUSA TENGGARA TIMUR 111 Phase 2 27 22 923 4.9 120.61948 -8.55822 15123 5307040006 KOLANA SELATAN NUSA TENGGARA TIMUR 28 Phase 3 7 5 943 1.3 125.04879 -8.27610 15124 5303191003 TIMAU NUSA TENGGARA TIMUR 212 Phase 2 50 35 150 7.6 123.79130 -9.59213 15125 5319050013 GOLO LERO NUSA TENGGARA TIMUR 28 Phase 2 9 7 641 1.6 120.61432 -8.55355 15126 5307040006 KOLANA SELATAN NUSA TENGGARA TIMUR 184 Phase 3 43 36 507 7.9 125.05427 -8.27532 15127 5303191003 TIMAU NUSA TENGGARA TIMUR 69 Phase 2 17 11 951 2.6 123.79074 -9.59156 15128 5319050013 GOLO LERO NUSA TENGGARA TIMUR 964 Phase 2 294 249 606 53.9 120.61757 -8.55315 15129 5307041008 TARAMANA NUSA TENGGARA TIMUR 330 Phase 3 97 82 353 17.8 124.85181 -8.16809 15130 5303191004 HONUK NUSA TENGGARA TIMUR 363 Phase 2 66 46 398 10.0 123.80327 -9.58267 15131 5319050012 RENGKAM NUSA TENGGARA TIMUR 17 Phase 2 5 4 245 0.9 120.62371 -8.55172 15132 5307041003 KENARIMBALA NUSA TENGGARA TIMUR 44 Phase 3 10 8 490 1.8 124.82311 -8.24506 15133 5303191002 FAUMES NUSA TENGGARA TIMUR 1 513 Phase 2 316 222 148 47.9 123.81961 -9.60670 15134 5319050012 RENGKAM NUSA TENGGARA TIMUR 76 Phase 2 22 18 678 4.0 120.62484 -8.54886 15135 5307041003 KENARIMBALA NUSA TENGGARA TIMUR 75 Phase 3 16 13 584 2.9 124.82740 -8.24238 15136 5303191004 HONUK NUSA TENGGARA TIMUR 1 413 Phase 2 254 178 562 38.5 123.83555 -9.58720 15137 5319050013 GOLO LERO NUSA TENGGARA TIMUR 12 Phase 2 4 3 396 0.7 120.62101 -8.54473 15138 5307041003 KENARIMBALA NUSA TENGGARA TIMUR 24 Phase 3 6 5 094 1.1 124.82924 -8.24133 15139 5306081001 DEBULULIK NUSA TENGGARA TIMUR 525 Phase 2 134 94 202 20.3 125.08213 -9.14006 15140 5319050012 RENGKAM NUSA TENGGARA TIMUR 56 Phase 2 16 13 584 2.9 120.62121 -8.54423 15141 5307041003 KENARIMBALA NUSA TENGGARA TIMUR 52 Phase 3 11 9 339 2.0 124.83099 -8.24204 15142 5304060006 KELLE NUSA TENGGARA TIMUR 235 Phase 2 53 37 259 8.0 124.39978 -10.05512 15143 5319050013 GOLO LERO NUSA TENGGARA TIMUR 151 Phase 2 46 39 054 8.4 120.61874 -8.53756 15144 5307041003 KENARIMBALA NUSA TENGGARA TIMUR 177 Phase 3 38 32 262 7.0 124.83098 -8.24006 15145 5304020004 TUASENE NUSA TENGGARA TIMUR 37 Phase 2 11 7 733 1.7 124.13810 -9.92938 15146 5319050013 GOLO LERO NUSA TENGGARA TIMUR 159 Phase 2 49 41 601 9.0 120.61622 -8.53826 15147 5310081003 WAILITI NUSA TENGGARA TIMUR 270 Phase 3 63 53 487 11.5 122.16259 -8.60078 15148 5304020004 TUASENE NUSA TENGGARA TIMUR 25 Phase 2 7 4 921 1.1 124.13943 -9.92725 15149 5319050012 RENGKAM NUSA TENGGARA TIMUR 1 481 Phase 2 412 349 788 75.5 120.62763 -8.54954 15150 5308070009 LEUBURI NUSA TENGGARA TIMUR 98 Phase 3 26 22 074 4.8 123.82365 -8.22460 15151 5304020004 TUASENE NUSA TENGGARA TIMUR 44 Phase 2 13 9 139 2.0 124.14082 -9.92521 15152 5311050027 NUALISE NUSA TENGGARA TIMUR 63 Phase 2 18 15 282 3.3 121.87285 -8.76936 15153 5307030008 SILAIPUI NUSA TENGGARA TIMUR 52 Phase 3 14 11 886 2.6 124.76207 -8.31663 15154 5304020004 TUASENE NUSA TENGGARA TIMUR 176 Phase 2 49 34 447 7.4 124.14395 -9.92296 15155 5311050027 NUALISE NUSA TENGGARA TIMUR 54 Phase 2 16 13 584 2.9 121.87472 -8.77077 15156 5307020007 WAKAPSIR TIMUR NUSA TENGGARA TIMUR 90 Phase 3 20 16 980 3.7 124.56459 -8.40927 15157 5304020004 TUASENE NUSA TENGGARA TIMUR 249 Phase 2 69 48 507 10.5 124.14695 -9.91913 15158 5311050027 NUALISE NUSA TENGGARA TIMUR 34 Phase 2 10 8 490 1.8 121.87533 -8.77085 15159 5307020006 WAKAPSIR NUSA TENGGARA TIMUR 57 Phase 3 15 12 735 2.7 124.56570 -8.41078 15160 5306011014 RAISAMANE NUSA TENGGARA TIMUR 180 Phase 2 45 31 635 6.8 124.81119 -9.62788 15161 5311050027 NUALISE NUSA TENGGARA TIMUR 619 Phase 2 173 146 877 31.7 121.88002 -8.76618 15162 5307030008 SILAIPUI NUSA TENGGARA TIMUR 99 Phase 3 27 22 923 4.9 124.76525 -8.32188 15163 5306011014 RAISAMANE NUSA TENGGARA TIMUR 72 Phase 2 18 12 654 2.7 124.81033 -9.62554 15164 5310071003 REROROJA NUSA TENGGARA TIMUR 329 Phase 2 70 59 430 12.8 122.02371 -8.55572 15165 5307030008 SILAIPUI NUSA TENGGARA TIMUR 196 Phase 3 52 44 148 9.5 124.76260 -8.33110 15166 5306011014 RAISAMANE NUSA TENGGARA TIMUR 416 Phase 2 104 73 112 15.8 124.80891 -9.62170 15167 5319010008 NGAMPANG MAS NUSA TENGGARA TIMUR 262 Phase 2 52 44 148 9.5 120.67640 -8.70784 15168 5307041007 AIR MANCUR NUSA TENGGARA TIMUR 82 Phase 3 28 23 772 5.1 124.79821 -8.17591 15169 5304111004 SAMBET NUSA TENGGARA TIMUR 184 Phase 2 44 30 932 6.7 124.75317 -9.68496 15170 5311071008 MAUTENDA NUSA TENGGARA TIMUR 161 Phase 2 35 29 715 6.4 121.70461 -8.58766 15171 5307041008 TARAMANA NUSA TENGGARA TIMUR 217 Phase 3 64 54 336 11.7 124.86039 -8.17131 15172 5304111004 SAMBET NUSA TENGGARA TIMUR 41 Phase 2 10 7 030 1.5 124.75415 -9.68908 15173 5318010015 WOEWOLO NUSA TENGGARA TIMUR 99 Phase 2 22 18 678 4.0 121.22912 -8.82357 15174 5307041003 KENARIMBALA NUSA TENGGARA TIMUR 153 Phase 3 33 28 017 6.0 124.85711 -8.19682 15175 5304111004 SAMBET NUSA TENGGARA TIMUR 639 Phase 2 151 106 153 22.9 124.76424 -9.68484 15176 5318010015 WOEWOLO NUSA TENGGARA TIMUR 126 Phase 2 27 22 923 4.9 121.23103 -8.82290 15177 5307041003 KENARIMBALA NUSA TENGGARA TIMUR 182 Phase 3 39 33 111 7.1 124.85792 -8.19835 15178 5304050010 BATNUN NUSA TENGGARA TIMUR 36 Phase 2 10 7 030 1.5 124.24463 -10.06715 15179 5319010001 BEA NGENCUNG NUSA TENGGARA TIMUR 115 Phase 2 27 22 923 4.9 120.55309 -8.80346 15180 5307041003 KENARIMBALA NUSA TENGGARA TIMUR 126 Phase 3 27 22 923 4.9 124.85552 -8.19873 15181 5304050010 BATNUN NUSA TENGGARA TIMUR 43 Phase 2 12 8 436 1.8 124.24744 -10.06840 15182 5319010001 BEA NGENCUNG NUSA TENGGARA TIMUR 131 Phase 2 31 26 319 5.7 120.54986 -8.80667 15183 5307030005 KUNEMAN NUSA TENGGARA TIMUR 22 Phase 3 6 5 094 1.1 124.77303 -8.32020 15184 5304050010 BATNUN NUSA TENGGARA TIMUR 163 Phase 2 42 29 526 6.4 124.24825 -10.06714 Annex II – Demand forecast results Page 61 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 15185 5319010001 BEA NGENCUNG NUSA TENGGARA TIMUR 240 Phase 2 56 47 544 10.3 120.54638 -8.81010 15186 5307030005 KUNEMAN NUSA TENGGARA TIMUR 23 Phase 3 6 5 094 1.1 124.77633 -8.32577 15187 5304041004 OEHALA NUSA TENGGARA TIMUR 134 Phase 2 34 23 902 5.2 124.19872 -9.93909 15188 5312020012 UBEDOLUMOLO NUSA TENGGARA TIMUR 277 Phase 2 56 47 544 10.3 120.98882 -8.80032 15189 5307030005 KUNEMAN NUSA TENGGARA TIMUR 225 Phase 3 55 46 695 10.1 124.77813 -8.32502 15190 5304051006 OEBAKI NUSA TENGGARA TIMUR 59 Phase 2 15 10 545 2.3 124.35039 -9.93122 15191 5313040018 WAE AJANG NUSA TENGGARA TIMUR 115 Phase 2 24 20 376 4.4 120.43496 -8.74173 15192 5308040011 LODOTODOKOWA NUSA TENGGARA TIMUR 51 Phase 3 15 12 735 2.7 123.65844 -8.34516 15193 5305025003 HAUMENI NUSA TENGGARA TIMUR 73 Phase 2 20 14 060 3.0 124.41221 -9.40603 15194 5313040018 WAE AJANG NUSA TENGGARA TIMUR 325 Phase 2 68 57 732 12.5 120.42809 -8.73856 15195 5310031011 WAIHAWA NUSA TENGGARA TIMUR 177 Phase 3 39 33 111 7.1 122.38930 -8.72922 15196 5305025003 HAUMENI NUSA TENGGARA TIMUR 83 Phase 2 23 16 169 3.5 124.40878 -9.40406 15197 5313040018 WAE AJANG NUSA TENGGARA TIMUR 123 Phase 2 26 22 074 4.8 120.42542 -8.73769 15198 5310031011 WAIHAWA NUSA TENGGARA TIMUR 172 Phase 3 38 32 262 7.0 122.39250 -8.74374 15199 5305025003 HAUMENI NUSA TENGGARA TIMUR 20 Phase 2 6 4 218 0.9 124.41100 -9.39896 15200 5313040018 WAE AJANG NUSA TENGGARA TIMUR 168 Phase 2 36 30 564 6.6 120.43145 -8.73450 15201 5308011008 PANTAI HARAPAN NUSA TENGGARA TIMUR 57 Phase 3 17 14 433 3.1 123.45269 -8.52916 15202 5305025003 HAUMENI NUSA TENGGARA TIMUR 77 Phase 2 21 14 763 3.2 124.41527 -9.39252 15203 5319020007 RANA KOLONG NUSA TENGGARA TIMUR 47 Phase 2 13 11 037 2.4 120.72935 -8.76740 15204 5307030005 KUNEMAN NUSA TENGGARA TIMUR 22 Phase 3 6 5 094 1.1 124.77281 -8.33155 15205 5305025006 SAINONI NUSA TENGGARA TIMUR 26 Phase 2 8 5 624 1.2 124.41434 -9.38495 15206 5319020007 RANA KOLONG NUSA TENGGARA TIMUR 146 Phase 2 40 33 960 7.3 120.74258 -8.77016 15207 5307030005 KUNEMAN NUSA TENGGARA TIMUR 175 Phase 3 43 36 507 7.9 124.77476 -8.34025 15208 5305025006 SAINONI NUSA TENGGARA TIMUR 322 Phase 2 87 61 161 13.2 124.41140 -9.38208 15209 5319020007 RANA KOLONG NUSA TENGGARA TIMUR 352 Phase 2 96 81 504 17.6 120.74427 -8.77231 15210 5307030004 KIRAMAN NUSA TENGGARA TIMUR 173 Phase 3 46 39 054 8.4 124.76537 -8.35271 15211 5305025005 TES NUSA TENGGARA TIMUR 55 Phase 2 14 9 842 2.1 124.40581 -9.37725 15212 5315050011 ROKAP NUSA TENGGARA TIMUR 308 Phase 2 96 81 504 17.6 120.19532 -8.37318 15213 5310082015 KOJADOI NUSA TENGGARA TIMUR 333 Phase 3 95 80 655 17.4 122.39496 -8.48839 15214 5305025005 TES NUSA TENGGARA TIMUR 227 Phase 2 56 39 368 8.5 124.40315 -9.37304 15215 5315050010 BARI NUSA TENGGARA TIMUR 46 Phase 2 10 8 490 1.8 120.19522 -8.37229 15216 5309074004 SAGU NUSA TENGGARA TIMUR 297 Phase 3 70 59 430 12.8 123.18450 -8.23854 15217 5305025004 NAPAN NUSA TENGGARA TIMUR 158 Phase 2 41 28 823 6.2 124.40264 -9.37124 15218 5315050010 BARI NUSA TENGGARA TIMUR 1 683 Phase 2 332 281 868 60.8 120.18172 -8.35157 15219 5307020026 MORBA NUSA TENGGARA TIMUR 64 Phase 3 14 11 886 2.6 124.53120 -8.26600 15220 5305025004 NAPAN NUSA TENGGARA TIMUR 560 Phase 2 145 101 935 22.0 124.40306 -9.36812 15221 5315050010 BARI NUSA TENGGARA TIMUR 131 Phase 2 26 22 074 4.8 120.16926 -8.35822 15222 5307030005 KUNEMAN NUSA TENGGARA TIMUR 269 Phase 3 66 56 034 12.1 124.78870 -8.34165 15223 5305025008 BANAIN B NUSA TENGGARA TIMUR 345 Phase 2 115 80 845 17.4 124.41904 -9.36216 15224 5315011007 TANJUNG PONTIANAK NUSA TENGGARA TIMUR 856 Phase 2 240 203 760 44.0 120.14832 -8.34565 15225 5310052001 TEKAIKU NUSA TENGGARA TIMUR 97 Phase 3 34 28 866 6.2 122.24251 -8.70605 15226 5305025007 BANAIN NUSA TENGGARA TIMUR 558 Phase 2 159 111 777 24.1 124.42234 -9.36300 15227 5315011007 TANJUNG PONTIANAK NUSA TENGGARA TIMUR 195 Phase 2 55 46 695 10.1 120.13094 -8.33962 15228 5307021001 LAKATULI NUSA TENGGARA TIMUR 70 Phase 3 17 14 433 3.1 124.66816 -8.38996 15229 5304091002 NUNBENA NUSA TENGGARA TIMUR 299 Phase 2 79 55 537 12.0 124.57713 -9.94076 15230 5315050013 NANGA KANTOR NUSA TENGGARA TIMUR 832 Phase 2 183 155 367 33.5 120.12652 -8.35025 15231 5307041003 KENARIMBALA NUSA TENGGARA TIMUR 57 Phase 3 12 10 188 2.2 124.82881 -8.23660 15232 5304050010 BATNUN NUSA TENGGARA TIMUR 660 Phase 2 169 118 807 25.6 124.24436 -10.06202 15233 5315050013 NANGA KANTOR NUSA TENGGARA TIMUR 380 Phase 2 84 71 316 15.4 120.12417 -8.35123 15234 5308020021 LEWOGROMA NUSA TENGGARA TIMUR 139 Phase 3 40 33 960 7.3 123.56493 -8.49030 15235 5304061007 NUNUSUNU NUSA TENGGARA TIMUR 121 Phase 2 28 19 684 4.2 124.39194 -10.05669 15236 5319020004 KOMBA NUSA TENGGARA TIMUR 312 Phase 2 73 61 977 13.4 120.72953 -8.80211 15237 5307010044 BUKITMAS NUSA TENGGARA TIMUR 164 Phase 3 41 34 809 7.5 124.23264 -8.25795 15238 5304061007 NUNUSUNU NUSA TENGGARA TIMUR 54 Phase 2 13 9 139 2.0 124.38068 -10.05834 15239 5315031009 DUNTA NUSA TENGGARA TIMUR 200 Phase 2 51 43 299 9.3 120.22433 -8.59983 15240 5307020007 WAKAPSIR TIMUR NUSA TENGGARA TIMUR 28 Phase 3 6 5 094 1.1 124.56545 -8.40727 15241 5304061007 NUNUSUNU NUSA TENGGARA TIMUR 47 Phase 2 11 7 733 1.7 124.37926 -10.05789 15242 5313130022 LADUR NUSA TENGGARA TIMUR 276 Phase 2 68 57 732 12.5 120.49670 -8.42587 15243 5307014008 TAMAKH NUSA TENGGARA TIMUR 72 Phase 3 15 12 735 2.7 124.21315 -8.40837 15244 5304050008 NOEMUKE NUSA TENGGARA TIMUR 32 Phase 2 8 5 624 1.2 124.36339 -10.05577 15245 5313130022 LADUR NUSA TENGGARA TIMUR 99 Phase 2 25 21 225 4.6 120.50438 -8.42499 15246 5307012002 LALAFANG NUSA TENGGARA TIMUR 99 Phase 3 23 19 527 4.2 124.18569 -8.37566 15247 5304050008 NOEMUKE NUSA TENGGARA TIMUR 32 Phase 2 8 5 624 1.2 124.35244 -10.06106 15248 5313130022 LADUR NUSA TENGGARA TIMUR 186 Phase 2 46 39 054 8.4 120.50631 -8.42507 15249 5307012002 LALAFANG NUSA TENGGARA TIMUR 389 Phase 3 88 74 712 16.1 124.18644 -8.37315 15250 5304050008 NOEMUKE NUSA TENGGARA TIMUR 23 Phase 2 6 4 218 0.9 124.34803 -10.05842 15251 5313130016 LANGKAS NUSA TENGGARA TIMUR 282 Phase 2 75 63 675 13.7 120.50875 -8.43436 15252 5309061007 OYANGBARANG NUSA TENGGARA TIMUR 102 Phase 3 27 22 923 4.9 123.06943 -8.36832 15253 5304050008 NOEMUKE NUSA TENGGARA TIMUR 1 049 Phase 2 248 174 344 37.6 124.34529 -10.06625 15254 5319050012 RENGKAM NUSA TENGGARA TIMUR 386 Phase 2 108 91 692 19.8 120.62849 -8.55307 15255 5307020007 WAKAPSIR TIMUR NUSA TENGGARA TIMUR 47 Phase 3 10 8 490 1.8 124.56863 -8.40121 15256 5304050008 NOEMUKE NUSA TENGGARA TIMUR 1 006 Phase 2 238 167 314 36.1 124.34335 -10.07563 15257 5319020004 KOMBA NUSA TENGGARA TIMUR 262 Phase 2 61 51 789 11.2 120.73066 -8.80635 15258 5307020007 WAKAPSIR TIMUR NUSA TENGGARA TIMUR 84 Phase 3 18 15 282 3.3 124.56844 -8.39464 15259 5304050008 NOEMUKE NUSA TENGGARA TIMUR 468 Phase 2 111 78 033 16.8 124.33620 -10.08659 15260 5318030016 WOEDOA NUSA TENGGARA TIMUR 345 Phase 2 86 73 014 15.8 121.36141 -8.74428 15261 5307020007 WAKAPSIR TIMUR NUSA TENGGARA TIMUR 62 Phase 3 14 11 886 2.6 124.57509 -8.40295 15262 5304061007 NUNUSUNU NUSA TENGGARA TIMUR 267 Phase 2 62 43 586 9.4 124.35026 -10.09104 15263 5313040009 TAL NUSA TENGGARA TIMUR 327 Phase 2 72 61 128 13.2 120.40093 -8.81230 15264 5307021001 LAKATULI NUSA TENGGARA TIMUR 58 Phase 3 14 11 886 2.6 124.57644 -8.40272 15265 5304061007 NUNUSUNU NUSA TENGGARA TIMUR 777 Phase 2 179 125 837 27.2 124.35588 -10.09371 15266 5312070020 NABELENA NUSA TENGGARA TIMUR 225 Phase 2 44 37 356 8.1 121.00430 -8.70384 15267 5307021001 LAKATULI NUSA TENGGARA TIMUR 20 Phase 3 5 4 245 0.9 124.58409 -8.40370 15268 5304070022 SOPO NUSA TENGGARA TIMUR 552 Phase 2 140 98 420 21.2 124.45396 -9.78640 15269 5319050011 WANGKAR WELI NUSA TENGGARA TIMUR 218 Phase 2 56 47 544 10.3 120.63571 -8.55893 Annex II – Demand forecast results Page 62 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 15270 5307021001 LAKATULI NUSA TENGGARA TIMUR 47 Phase 3 12 10 188 2.2 124.58595 -8.40593 15271 5304050010 BATNUN NUSA TENGGARA TIMUR 86 Phase 2 23 16 169 3.5 124.25101 -10.07024 15272 5319050011 WANGKAR WELI NUSA TENGGARA TIMUR 519 Phase 2 132 112 068 24.2 120.63703 -8.56207 15273 5307021001 LAKATULI NUSA TENGGARA TIMUR 95 Phase 3 23 19 527 4.2 124.58901 -8.40708 15274 5304050010 BATNUN NUSA TENGGARA TIMUR 149 Phase 2 39 27 417 5.9 124.25499 -10.06946 15275 5310061006 LADOLAKA NUSA TENGGARA TIMUR 61 Phase 2 17 14 433 3.1 121.70093 -8.29819 15276 5307020007 WAKAPSIR TIMUR NUSA TENGGARA TIMUR 90 Phase 3 20 16 980 3.7 124.56500 -8.38734 15277 5304050010 BATNUN NUSA TENGGARA TIMUR 58 Phase 2 15 10 545 2.3 124.25520 -10.06739 15278 5318020005 UDIWOROWATU NUSA TENGGARA TIMUR 86 Phase 2 22 18 678 4.0 121.29323 -8.89227 15279 5309070003 DAWATAA NUSA TENGGARA TIMUR 164 Phase 3 45 38 205 8.2 123.10880 -8.36505 15280 5304060005 KUANFATU NUSA TENGGARA TIMUR 186 Phase 2 44 30 932 6.7 124.44259 -10.02375 15281 5318020005 UDIWOROWATU NUSA TENGGARA TIMUR 96 Phase 2 24 20 376 4.4 121.29564 -8.89257 15282 5307030005 KUNEMAN NUSA TENGGARA TIMUR 98 Phase 3 24 20 376 4.4 124.79578 -8.34427 15283 5304081001 SILLU NUSA TENGGARA TIMUR 80 Phase 2 22 15 466 3.3 124.51932 -9.79200 15284 5318020005 UDIWOROWATU NUSA TENGGARA TIMUR 129 Phase 2 32 27 168 5.9 121.29572 -8.89433 15285 5308010001 PASIR PUTIH NUSA TENGGARA TIMUR 185 Phase 3 57 48 393 10.4 123.26050 -8.54257 15286 5306021016 MANUMUTIN SILOLE NUSA TENGGARA TIMUR 24 Phase 2 7 4 921 1.1 124.80127 -9.53786 15287 5318020005 UDIWOROWATU NUSA TENGGARA TIMUR 283 Phase 2 70 59 430 12.8 121.29414 -8.89925 15288 5307042002 KAILESA NUSA TENGGARA TIMUR 91 Phase 3 26 22 074 4.8 124.80593 -8.35372 15289 5306021016 MANUMUTIN SILOLE NUSA TENGGARA TIMUR 191 Phase 2 56 39 368 8.5 124.79932 -9.53800 15290 5318020002 WITUROMBAUA NUSA TENGGARA TIMUR 217 Phase 2 63 53 487 11.5 121.29667 -8.90356 15291 5307042002 KAILESA NUSA TENGGARA TIMUR 52 Phase 3 15 12 735 2.7 124.82238 -8.35471 15292 5306021016 MANUMUTIN SILOLE NUSA TENGGARA TIMUR 41 Phase 2 12 8 436 1.8 124.80238 -9.54559 15293 5318020002 WITUROMBAUA NUSA TENGGARA TIMUR 243 Phase 2 71 60 279 13.0 121.29501 -8.90424 15294 5307042002 KAILESA NUSA TENGGARA TIMUR 160 Phase 3 45 38 205 8.2 124.82512 -8.35499 15295 5306021016 MANUMUTIN SILOLE NUSA TENGGARA TIMUR 17 Phase 2 5 3 515 0.8 124.80091 -9.54673 15296 5318020005 UDIWOROWATU NUSA TENGGARA TIMUR 192 Phase 2 48 40 752 8.8 121.29055 -8.90019 15297 5307042001 LANGKURU NUSA TENGGARA TIMUR 64 Phase 3 16 13 584 2.9 124.83154 -8.38529 15298 5306011018 NANEBOT NUSA TENGGARA TIMUR 115 Phase 2 27 18 981 4.1 124.79104 -9.54633 15299 5318020001 MBAENUAMURI NUSA TENGGARA TIMUR 111 Phase 2 30 25 470 5.5 121.28903 -8.89618 15300 5307042001 LANGKURU NUSA TENGGARA TIMUR 166 Phase 3 41 34 809 7.5 124.83412 -8.38521 15301 5306011018 NANEBOT NUSA TENGGARA TIMUR 227 Phase 2 53 37 259 8.0 124.78550 -9.54529 15302 5318070002 NATATOTO NUSA TENGGARA TIMUR 254 Phase 2 60 50 940 11.0 121.36039 -8.63614 15303 5307042001 LANGKURU NUSA TENGGARA TIMUR 240 Phase 3 59 50 091 10.8 124.83982 -8.38416 15304 5306023002 BANI BANI NUSA TENGGARA TIMUR 82 Phase 2 24 16 872 3.6 124.77333 -9.54603 15305 5318070002 NATATOTO NUSA TENGGARA TIMUR 646 Phase 2 153 129 897 28.0 121.36071 -8.63916 15306 5310031007 WOLOMOTONG NUSA TENGGARA TIMUR 60 Phase 3 13 11 037 2.4 122.32191 -8.71470 15307 5306023001 FATOIN NUSA TENGGARA TIMUR 138 Phase 2 33 23 199 5.0 124.76864 -9.54980 15308 5311053005 NUAMURI BARAT NUSA TENGGARA TIMUR 297 Phase 2 76 64 524 13.9 121.82906 -8.73548 15309 5310030006 IPIR NUSA TENGGARA TIMUR 53 Phase 3 15 12 735 2.7 122.32156 -8.71476 15310 5306023002 BANI BANI NUSA TENGGARA TIMUR 45 Phase 2 13 9 139 2.0 124.76445 -9.54541 15311 5312030001 WOGOWELA NUSA TENGGARA TIMUR 295 Phase 2 69 58 581 12.6 121.03146 -8.95506 15312 5307042004 LANGKURU UTARA NUSA TENGGARA TIMUR 26 Phase 3 7 5 943 1.3 124.82251 -8.33773 15313 5306023001 FATOIN NUSA TENGGARA TIMUR 76 Phase 2 19 13 357 2.9 124.76393 -9.54550 15314 5313130011 COMPANG CIBAL NUSA TENGGARA TIMUR 98 Phase 2 26 22 074 4.8 120.47375 -8.48639 15315 5307042004 LANGKURU UTARA NUSA TENGGARA TIMUR 17 Phase 3 5 4 245 0.9 124.82148 -8.33037 15316 5306023002 BANI BANI NUSA TENGGARA TIMUR 34 Phase 2 10 7 030 1.5 124.76270 -9.53904 15317 5313130011 COMPANG CIBAL NUSA TENGGARA TIMUR 153 Phase 2 41 34 809 7.5 120.47529 -8.48440 15318 5307042004 LANGKURU UTARA NUSA TENGGARA TIMUR 25 Phase 3 7 5 943 1.3 124.82839 -8.32560 15319 5306023001 FATOIN NUSA TENGGARA TIMUR 36 Phase 2 9 6 327 1.4 124.76227 -9.53890 15320 5315010013 WATU NGGELEK NUSA TENGGARA TIMUR 141 Phase 2 37 31 413 6.8 119.93499 -8.56046 15321 5307042004 LANGKURU UTARA NUSA TENGGARA TIMUR 61 Phase 3 16 13 584 2.9 124.82803 -8.32379 15322 5306023001 FATOIN NUSA TENGGARA TIMUR 123 Phase 2 30 21 090 4.6 124.75901 -9.53714 15323 5315010013 WATU NGGELEK NUSA TENGGARA TIMUR 561 Phase 2 147 124 803 26.9 119.93627 -8.56542 15324 5307042004 LANGKURU UTARA NUSA TENGGARA TIMUR 19 Phase 3 5 4 245 0.9 124.83491 -8.32552 15325 5306023002 BANI BANI NUSA TENGGARA TIMUR 341 Phase 2 97 68 191 14.7 124.75835 -9.53265 15326 5319020011 PONG RUAN NUSA TENGGARA TIMUR 78 Phase 2 20 16 980 3.7 120.66537 -8.75867 15327 5307042004 LANGKURU UTARA NUSA TENGGARA TIMUR 58 Phase 3 15 12 735 2.7 124.83657 -8.32577 15328 5306023002 BANI BANI NUSA TENGGARA TIMUR 278 Phase 2 79 55 537 12.0 124.76793 -9.52697 15329 5319020011 PONG RUAN NUSA TENGGARA TIMUR 167 Phase 2 42 35 658 7.7 120.66113 -8.75937 15330 5307042004 LANGKURU UTARA NUSA TENGGARA TIMUR 11 Phase 3 3 2 547 0.5 124.83678 -8.32798 15331 5306023003 IKAN TUNABEIS NUSA TENGGARA TIMUR 275 Phase 2 53 37 259 8.0 124.77378 -9.52441 15332 5319020010 RUAN NUSA TENGGARA TIMUR 19 Phase 2 4 3 396 0.7 120.65915 -8.75549 15333 5307042004 LANGKURU UTARA NUSA TENGGARA TIMUR 65 Phase 3 17 14 433 3.1 124.83837 -8.33264 15334 5306023003 IKAN TUNABEIS NUSA TENGGARA TIMUR 33 Phase 2 7 4 921 1.1 124.77596 -9.52467 15335 5319020010 RUAN NUSA TENGGARA TIMUR 609 Phase 2 122 103 578 22.3 120.65429 -8.75921 15336 5307042004 LANGKURU UTARA NUSA TENGGARA TIMUR 57 Phase 3 15 12 735 2.7 124.83752 -8.32437 15337 5306023003 IKAN TUNABEIS NUSA TENGGARA TIMUR 773 Phase 2 147 103 341 22.3 124.78192 -9.51785 15338 5319020010 RUAN NUSA TENGGARA TIMUR 449 Phase 2 90 76 410 16.5 120.64799 -8.76127 15339 5307042004 LANGKURU UTARA NUSA TENGGARA TIMUR 81 Phase 3 21 17 829 3.8 124.84029 -8.32423 15340 5305040027 SUSULAKU B NUSA TENGGARA TIMUR 27 Phase 2 7 4 921 1.1 124.75020 -9.54059 15341 5319020010 RUAN NUSA TENGGARA TIMUR 136 Phase 2 28 23 772 5.1 120.64456 -8.76623 15342 5307042004 LANGKURU UTARA NUSA TENGGARA TIMUR 27 Phase 3 7 5 943 1.3 124.85137 -8.32066 15343 5305040027 SUSULAKU B NUSA TENGGARA TIMUR 212 Phase 2 48 33 744 7.3 124.74876 -9.54029 15344 5319020010 RUAN NUSA TENGGARA TIMUR 531 Phase 2 107 90 843 19.6 120.63812 -8.77135 15345 5307042004 LANGKURU UTARA NUSA TENGGARA TIMUR 56 Phase 3 14 11 886 2.6 124.85129 -8.31740 15346 5305040027 SUSULAKU B NUSA TENGGARA TIMUR 118 Phase 2 27 18 981 4.1 124.73300 -9.54998 15347 5319020010 RUAN NUSA TENGGARA TIMUR 450 Phase 2 90 76 410 16.5 120.64249 -8.77679 15348 5307042004 LANGKURU UTARA NUSA TENGGARA TIMUR 210 Phase 3 53 44 997 9.7 124.85539 -8.33464 15349 5305040027 SUSULAKU B NUSA TENGGARA TIMUR 296 Phase 2 67 47 101 10.2 124.73032 -9.55052 15350 5310010016 WOLOREGA NUSA TENGGARA TIMUR 56 Phase 2 21 17 829 3.8 122.02912 -8.71480 15351 5307042004 LANGKURU UTARA NUSA TENGGARA TIMUR 18 Phase 3 5 4 245 0.9 124.86177 -8.33857 15352 5306011011 WEKMURAK NUSA TENGGARA TIMUR 270 Phase 2 58 40 774 8.8 124.73201 -9.56247 15353 5310010016 WOLOREGA NUSA TENGGARA TIMUR 68 Phase 2 25 21 225 4.6 122.03021 -8.71244 15354 5307042002 KAILESA NUSA TENGGARA TIMUR 373 Phase 3 104 88 296 19.1 124.85927 -8.34891 Annex II – Demand forecast results Page 63 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 15355 5306011011 WEKMURAK NUSA TENGGARA TIMUR 22 Phase 2 5 3 515 0.8 124.72959 -9.56294 15356 5310010016 WOLOREGA NUSA TENGGARA TIMUR 69 Phase 2 25 21 225 4.6 122.03211 -8.70739 15357 5307042004 LANGKURU UTARA NUSA TENGGARA TIMUR 70 Phase 3 18 15 282 3.3 124.82429 -8.32125 15358 5306011011 WEKMURAK NUSA TENGGARA TIMUR 331 Phase 2 71 49 913 10.8 124.72167 -9.56176 15359 5310010016 WOLOREGA NUSA TENGGARA TIMUR 91 Phase 2 33 28 017 6.0 122.03401 -8.70582 15360 5310070009 LADOGAHAR NUSA TENGGARA TIMUR 1 071 Phase 3 42 35 658 7.7 122.13756 -8.62677 15361 5306011011 WEKMURAK NUSA TENGGARA TIMUR 41 Phase 2 9 6 327 1.4 124.72026 -9.56585 15362 5310010016 WOLOREGA NUSA TENGGARA TIMUR 216 Phase 2 78 66 222 14.3 122.03871 -8.70439 15363 5310020004 LELA NUSA TENGGARA TIMUR 31 Phase 3 8 6 792 1.5 122.16965 -8.71100 15364 5306011010 NAE T NUSA TENGGARA TIMUR 64 Phase 2 16 11 248 2.4 124.71382 -9.56528 15365 5310010016 WOLOREGA NUSA TENGGARA TIMUR 182 Phase 2 66 56 034 12.1 122.04607 -8.70880 15366 5310020008 BAOPAAT NUSA TENGGARA TIMUR 120 Phase 3 32 27 168 5.9 122.16423 -8.71613 15367 5306011010 NAE T NUSA TENGGARA TIMUR 766 Phase 2 188 132 164 28.5 124.71178 -9.56643 15368 5310010016 WOLOREGA NUSA TENGGARA TIMUR 182 Phase 2 66 56 034 12.1 122.02390 -8.71405 15369 5308070002 BEAN NUSA TENGGARA TIMUR 126 Phase 3 37 31 413 6.8 123.80716 -8.26793 15370 5304060004 KUSI NUSA TENGGARA TIMUR 117 Phase 2 28 19 684 4.2 124.49304 -10.05357 15371 5311010016 SANGGARHORHO NUSA TENGGARA TIMUR 214 Phase 2 45 38 205 8.2 121.49238 -8.77963 15372 5308070002 BEAN NUSA TENGGARA TIMUR 34 Phase 3 10 8 490 1.8 123.80943 -8.26382 15373 5304060004 KUSI NUSA TENGGARA TIMUR 107 Phase 2 25 17 575 3.8 124.49104 -10.05515 15374 5311010016 SANGGARHORHO NUSA TENGGARA TIMUR 27 Phase 2 6 5 094 1.1 121.49991 -8.77613 15375 5308070002 BEAN NUSA TENGGARA TIMUR 105 Phase 3 31 26 319 5.7 123.81405 -8.26427 15376 5306081007 LOONUNA NUSA TENGGARA TIMUR 312 Phase 2 82 57 646 12.4 125.12032 -9.14432 15377 5311010016 SANGGARHORHO NUSA TENGGARA TIMUR 288 Phase 2 60 50 940 11.0 121.50073 -8.77577 15378 5308070002 BEAN NUSA TENGGARA TIMUR 37 Phase 3 11 9 339 2.0 123.81729 -8.26495 15379 5306081001 DEBULULIK NUSA TENGGARA TIMUR 373 Phase 2 96 67 488 14.6 125.07915 -9.14220 15380 5311010016 SANGGARHORHO NUSA TENGGARA TIMUR 344 Phase 2 72 61 128 13.2 121.50350 -8.76620 15381 5308070002 BEAN NUSA TENGGARA TIMUR 77 Phase 3 23 19 527 4.2 123.82291 -8.26873 15382 5306081001 DEBULULIK NUSA TENGGARA TIMUR 88 Phase 2 23 16 169 3.5 125.06392 -9.14200 15383 5311010016 SANGGARHORHO NUSA TENGGARA TIMUR 137 Phase 2 29 24 621 5.3 121.50625 -8.77672 15384 5308011015 ATAILI NUSA TENGGARA TIMUR 43 Phase 3 13 11 037 2.4 123.44917 -8.50548 15385 5306080008 DIRUN NUSA TENGGARA TIMUR 67 Phase 2 16 11 248 2.4 125.05953 -9.13113 15386 5311010003 ZOZOZEA NUSA TENGGARA TIMUR 543 Phase 2 123 104 427 22.5 121.50865 -8.78343 15387 5308011015 ATAILI NUSA TENGGARA TIMUR 31 Phase 3 10 8 490 1.8 123.44904 -8.49909 15388 5306080007 MAUDEMU NUSA TENGGARA TIMUR 220 Phase 2 60 42 180 9.1 125.05494 -9.12438 15389 5310010016 WOLOREGA NUSA TENGGARA TIMUR 53 Phase 2 19 16 131 3.5 122.01699 -8.71713 15390 5308020018 NOGO DONI NUSA TENGGARA TIMUR 93 Phase 3 36 30 564 6.6 123.44784 -8.49806 15391 5306080007 MAUDEMU NUSA TENGGARA TIMUR 186 Phase 2 51 35 853 7.7 125.04568 -9.12661 15392 5310012014 RENGGARASI NUSA TENGGARA TIMUR 55 Phase 2 12 10 188 2.2 122.00933 -8.71329 15393 5308020018 NOGO DONI NUSA TENGGARA TIMUR 14 Phase 3 6 5 094 1.1 123.44544 -8.49291 15394 5306080007 MAUDEMU NUSA TENGGARA TIMUR 404 Phase 2 110 77 330 16.7 125.03772 -9.12396 15395 5310012014 RENGGARASI NUSA TENGGARA TIMUR 44 Phase 2 9 7 641 1.6 122.00546 -8.70840 15396 5308020018 NOGO DONI NUSA TENGGARA TIMUR 41 Phase 3 16 13 584 2.9 123.44555 -8.49120 15397 5306080007 MAUDEMU NUSA TENGGARA TIMUR 173 Phase 2 47 33 041 7.1 125.03673 -9.12537 15398 5310012014 RENGGARASI NUSA TENGGARA TIMUR 12 Phase 2 3 2 547 0.5 122.00009 -8.70833 15399 5308040013 BALUREBONG NUSA TENGGARA TIMUR 352 Phase 3 82 69 618 15.0 123.66951 -8.39804 15400 5306080007 MAUDEMU NUSA TENGGARA TIMUR 4 Phase 2 2 1 406 0.3 125.03558 -9.12497 15401 5310012014 RENGGARASI NUSA TENGGARA TIMUR 60 Phase 2 13 11 037 2.4 122.00209 -8.70386 15402 5307042004 LANGKURU UTARA NUSA TENGGARA TIMUR 50 Phase 3 13 11 037 2.4 124.81727 -8.32653 15403 5306080007 MAUDEMU NUSA TENGGARA TIMUR 93 Phase 2 26 18 278 3.9 125.03540 -9.12533 15404 5310012014 RENGGARASI NUSA TENGGARA TIMUR 72 Phase 2 15 12 735 2.7 122.00398 -8.69991 15405 5309060018 PAJINIAN NUSA TENGGARA TIMUR 7 Phase 3 2 1 698 0.4 123.09261 -8.31294 15406 5306080007 MAUDEMU NUSA TENGGARA TIMUR 105 Phase 2 29 20 387 4.4 125.03222 -9.12673 15407 5310010016 WOLOREGA NUSA TENGGARA TIMUR 75 Phase 2 27 22 923 4.9 122.00829 -8.69949 15408 5307021001 LAKATULI NUSA TENGGARA TIMUR 68 Phase 3 17 14 433 3.1 124.66633 -8.38810 15409 5306070017 HALIMODOK NUSA TENGGARA TIMUR 200 Phase 2 47 33 041 7.1 125.01929 -9.12653 15410 5310010016 WOLOREGA NUSA TENGGARA TIMUR 49 Phase 2 18 15 282 3.3 122.01591 -8.69708 15411 5307020027 PAILELANG NUSA TENGGARA TIMUR 54 Phase 3 15 12 735 2.7 124.53689 -8.26225 15412 5306070017 HALIMODOK NUSA TENGGARA TIMUR 79 Phase 2 19 13 357 2.9 125.01214 -9.12526 15413 5310010016 WOLOREGA NUSA TENGGARA TIMUR 32 Phase 2 12 10 188 2.2 122.01652 -8.69795 15414 5307021003 KAMAIFUI NUSA TENGGARA TIMUR 72 Phase 3 16 13 584 2.9 124.66515 -8.34310 15415 5306070017 HALIMODOK NUSA TENGGARA TIMUR 229 Phase 2 53 37 259 8.0 125.01063 -9.12437 15416 5310010016 WOLOREGA NUSA TENGGARA TIMUR 63 Phase 2 23 19 527 4.2 122.01851 -8.69560 15417 5309012004 NURRI NUSA TENGGARA TIMUR 197 Phase 3 57 48 393 10.4 122.82621 -8.51706 15418 5306070017 HALIMODOK NUSA TENGGARA TIMUR 245 Phase 2 57 40 071 8.6 125.00703 -9.12588 15419 5310010016 WOLOREGA NUSA TENGGARA TIMUR 49 Phase 2 18 15 282 3.3 122.02367 -8.69033 15420 5309012004 NURRI NUSA TENGGARA TIMUR 71 Phase 3 21 17 829 3.8 122.82376 -8.51608 15421 5306070017 HALIMODOK NUSA TENGGARA TIMUR 191 Phase 2 44 30 932 6.7 125.00602 -9.12414 15422 5310010016 WOLOREGA NUSA TENGGARA TIMUR 110 Phase 2 40 33 960 7.3 122.01902 -8.68762 15423 5307041003 KENARIMBALA NUSA TENGGARA TIMUR 71 Phase 3 15 12 735 2.7 124.82598 -8.23016 15424 5306070017 HALIMODOK NUSA TENGGARA TIMUR 161 Phase 2 38 26 714 5.8 125.00434 -9.13027 15425 5310010016 WOLOREGA NUSA TENGGARA TIMUR 52 Phase 2 19 16 131 3.5 122.02448 -8.68331 15426 5309060017 DANIBAO NUSA TENGGARA TIMUR 141 Phase 3 32 27 168 5.9 123.09351 -8.29457 15427 5306070017 HALIMODOK NUSA TENGGARA TIMUR 115 Phase 2 27 18 981 4.1 125.01344 -9.13607 15428 5310011009 KOWI NUSA TENGGARA TIMUR 731 Phase 2 176 149 424 32.2 122.03228 -8.68402 15429 5307060025 ALILA SELATAN NUSA TENGGARA TIMUR 16 Phase 3 5 4 245 0.9 124.49286 -8.14935 15430 5306070003 TAKIRIN NUSA TENGGARA TIMUR 357 Phase 2 95 66 785 14.4 125.00633 -9.14837 15431 5310010016 WOLOREGA NUSA TENGGARA TIMUR 46 Phase 2 17 14 433 3.1 122.01495 -8.68777 15432 5307060023 ALILA NUSA TENGGARA TIMUR 110 Phase 3 35 29 715 6.4 124.49168 -8.14899 15433 5306070003 TAKIRIN NUSA TENGGARA TIMUR 562 Phase 2 148 104 044 22.4 124.99746 -9.15235 15434 5310011009 KOWI NUSA TENGGARA TIMUR 139 Phase 2 34 28 866 6.2 122.01119 -8.68084 15435 5307040004 ELOK NUSA TENGGARA TIMUR 449 Phase 3 99 84 051 18.1 125.09323 -8.34353 15436 5306072005 RAIULUN NUSA TENGGARA TIMUR 192 Phase 2 50 35 150 7.6 125.08957 -9.07798 15437 5310010016 WOLOREGA NUSA TENGGARA TIMUR 44 Phase 2 16 13 584 2.9 122.00875 -8.67404 15438 5309020018 LATON LIWO NUSA TENGGARA TIMUR 65 Phase 3 16 13 584 2.9 122.85693 -8.07139 15439 5305020040 FATUSENE NUSA TENGGARA TIMUR 7 Phase 2 2 1 406 0.3 124.47898 -9.39644 Annex II – Demand forecast results Page 64 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 15440 5310010016 WOLOREGA NUSA TENGGARA TIMUR 141 Phase 2 51 43 299 9.3 122.00214 -8.67719 15441 5307042002 KAILESA NUSA TENGGARA TIMUR 27 Phase 3 8 6 792 1.5 124.80366 -8.35683 15442 5305020040 FATUSENE NUSA TENGGARA TIMUR 48 Phase 2 14 9 842 2.1 124.47986 -9.39525 15443 5310012021 TUWA NUSA TENGGARA TIMUR 112 Phase 2 23 19 527 4.2 122.00135 -8.66863 15444 5307042001 LANGKURU NUSA TENGGARA TIMUR 54 Phase 3 14 11 886 2.6 124.80396 -8.35737 15445 5305020040 FATUSENE NUSA TENGGARA TIMUR 322 Phase 2 90 63 270 13.7 124.48137 -9.39112 15446 5310012021 TUWA NUSA TENGGARA TIMUR 315 Phase 2 63 53 487 11.5 121.99629 -8.66447 15447 5307012008 MAWAR NUSA TENGGARA TIMUR 120 Phase 3 29 24 621 5.3 124.30194 -8.32318 15448 5303142001 KUANHEUM NUSA TENGGARA TIMUR 42 Phase 2 10 7 030 1.5 123.87464 -10.15730 15449 5310012021 TUWA NUSA TENGGARA TIMUR 208 Phase 2 42 35 658 7.7 121.99975 -8.65815 15450 5307021006 MATARU UTARA NUSA TENGGARA TIMUR 65 Phase 3 13 11 037 2.4 124.62110 -8.34453 15451 5303142001 KUANHEUM NUSA TENGGARA TIMUR 189 Phase 2 42 29 526 6.4 123.87551 -10.15703 15452 5310012021 TUWA NUSA TENGGARA TIMUR 168 Phase 2 34 28 866 6.2 122.00031 -8.65824 15453 5307011009 LEER NUSA TENGGARA TIMUR 210 Phase 3 52 44 148 9.5 124.08483 -8.33559 15454 5303142007 OEFETO NUSA TENGGARA TIMUR 272 Phase 2 77 54 131 11.7 123.87761 -10.15576 15455 5310012021 TUWA NUSA TENGGARA TIMUR 207 Phase 2 42 35 658 7.7 121.99441 -8.66811 15456 5307011010 BLANG MERANG NUSA TENGGARA TIMUR 14 Phase 3 4 3 396 0.7 124.08620 -8.33485 15457 5304040011 PUSU NUSA TENGGARA TIMUR 64 Phase 2 17 11 951 2.6 124.31647 -9.91530 15458 5310012021 TUWA NUSA TENGGARA TIMUR 130 Phase 2 26 22 074 4.8 121.99193 -8.66983 15459 5307012001 TREWENG NUSA TENGGARA TIMUR 240 Phase 3 67 56 883 12.3 124.27450 -8.47351 15460 5304110008 SNOK NUSA TENGGARA TIMUR 100 Phase 2 27 18 981 4.1 124.69567 -9.71144 15461 5310012021 TUWA NUSA TENGGARA TIMUR 635 Phase 2 127 107 823 23.3 121.98781 -8.66866 15462 5307012001 TREWENG NUSA TENGGARA TIMUR 49 Phase 3 14 11 886 2.6 124.28478 -8.47094 15463 5303160009 SILLU NUSA TENGGARA TIMUR 490 Phase 2 101 71 003 15.3 124.02461 -10.04153 15464 5310012021 TUWA NUSA TENGGARA TIMUR 3 Phase 2 1 849 0.2 121.98935 -8.67345 15465 5307012001 TREWENG NUSA TENGGARA TIMUR 372 Phase 3 104 88 296 19.1 124.28809 -8.47556 15466 5303160009 SILLU NUSA TENGGARA TIMUR 414 Phase 2 86 60 458 13.0 124.02696 -10.03701 15467 5310012013 LOKE NUSA TENGGARA TIMUR 72 Phase 2 12 10 188 2.2 121.98897 -8.67344 15468 5307012001 TREWENG NUSA TENGGARA TIMUR 76 Phase 3 22 18 678 4.0 124.28165 -8.48298 15469 5303160009 SILLU NUSA TENGGARA TIMUR 454 Phase 2 94 66 082 14.3 124.02457 -10.02542 15470 5310012013 LOKE NUSA TENGGARA TIMUR 387 Phase 2 62 52 638 11.4 121.98238 -8.67446 15471 5307021001 LAKATULI NUSA TENGGARA TIMUR 44 Phase 3 11 9 339 2.0 124.57993 -8.39595 15472 5304050010 BATNUN NUSA TENGGARA TIMUR 76 Phase 2 20 14 060 3.0 124.25983 -10.06933 15473 5310012013 LOKE NUSA TENGGARA TIMUR 303 Phase 2 49 41 601 9.0 121.97785 -8.67658 15474 5307020015 KAFELULANG NUSA TENGGARA TIMUR 8 Phase 3 2 1 698 0.4 124.58167 -8.37715 15475 5304050010 BATNUN NUSA TENGGARA TIMUR 146 Phase 2 38 26 714 5.8 124.26447 -10.06880 15476 5310012013 LOKE NUSA TENGGARA TIMUR 287 Phase 2 46 39 054 8.4 121.97543 -8.67863 15477 5307021007 MATARU BARAT NUSA TENGGARA TIMUR 205 Phase 3 41 34 809 7.5 124.58214 -8.37649 15478 5304050010 BATNUN NUSA TENGGARA TIMUR 163 Phase 2 42 29 526 6.4 124.27343 -10.06522 15479 5310012014 RENGGARASI NUSA TENGGARA TIMUR 12 Phase 2 3 2 547 0.5 121.99990 -8.70842 15480 5307021001 LAKATULI NUSA TENGGARA TIMUR 96 Phase 3 23 19 527 4.2 124.66219 -8.38858 15481 5304050009 OEKIU NUSA TENGGARA TIMUR 84 Phase 2 21 14 763 3.2 124.29335 -10.06918 15482 5310012014 RENGGARASI NUSA TENGGARA TIMUR 51 Phase 2 11 9 339 2.0 121.99868 -8.71073 15483 5307042001 LANGKURU NUSA TENGGARA TIMUR 108 Phase 3 27 22 923 4.9 124.87950 -8.35353 15484 5304050009 OEKIU NUSA TENGGARA TIMUR 103 Phase 2 25 17 575 3.8 124.29593 -10.06931 15485 5310012014 RENGGARASI NUSA TENGGARA TIMUR 178 Phase 2 36 30 564 6.6 121.99002 -8.70738 15486 5307042001 LANGKURU NUSA TENGGARA TIMUR 61 Phase 3 15 12 735 2.7 124.88611 -8.36462 15487 5304050009 OEKIU NUSA TENGGARA TIMUR 203 Phase 2 50 35 150 7.6 124.29771 -10.06658 15488 5310012014 RENGGARASI NUSA TENGGARA TIMUR 92 Phase 2 19 16 131 3.5 121.98707 -8.71122 15489 5307042001 LANGKURU NUSA TENGGARA TIMUR 22 Phase 3 6 5 094 1.1 124.88684 -8.36509 15490 5304050009 OEKIU NUSA TENGGARA TIMUR 357 Phase 2 87 61 161 13.2 124.30133 -10.06850 15491 5310012014 RENGGARASI NUSA TENGGARA TIMUR 74 Phase 2 15 12 735 2.7 121.98528 -8.71439 15492 5307042003 PURNAMA NUSA TENGGARA TIMUR 133 Phase 3 35 29 715 6.4 124.89460 -8.36322 15493 5304050009 OEKIU NUSA TENGGARA TIMUR 214 Phase 2 52 36 556 7.9 124.30440 -10.06632 15494 5310012014 RENGGARASI NUSA TENGGARA TIMUR 55 Phase 2 12 10 188 2.2 121.98638 -8.71537 15495 5307042003 PURNAMA NUSA TENGGARA TIMUR 87 Phase 3 23 19 527 4.2 124.90432 -8.34789 15496 5304050009 OEKIU NUSA TENGGARA TIMUR 83 Phase 2 21 14 763 3.2 124.30841 -10.06534 15497 5310012014 RENGGARASI NUSA TENGGARA TIMUR 117 Phase 2 24 20 376 4.4 121.98294 -8.71976 15498 5307042003 PURNAMA NUSA TENGGARA TIMUR 91 Phase 3 24 20 376 4.4 124.90741 -8.34440 15499 5304050009 OEKIU NUSA TENGGARA TIMUR 167 Phase 2 41 28 823 6.2 124.31095 -10.06666 15500 5310012014 RENGGARASI NUSA TENGGARA TIMUR 37 Phase 2 8 6 792 1.5 121.98571 -8.72442 15501 5307042003 PURNAMA NUSA TENGGARA TIMUR 105 Phase 3 28 23 772 5.1 124.90507 -8.34257 15502 5306011005 BIUDUKFOHO NUSA TENGGARA TIMUR 173 Phase 2 39 27 417 5.9 124.74136 -9.61683 15503 5310012014 RENGGARASI NUSA TENGGARA TIMUR 167 Phase 2 34 28 866 6.2 121.98987 -8.72154 15504 5309050009 TANAH WERANG NUSA TENGGARA TIMUR 10 Phase 3 3 2 547 0.5 123.15843 -8.44481 15505 5304100017 LANU NUSA TENGGARA TIMUR 184 Phase 2 53 37 259 8.0 124.65489 -9.83894 15506 5310012014 RENGGARASI NUSA TENGGARA TIMUR 60 Phase 2 13 11 037 2.4 121.99438 -8.72394 15507 5309050010 MOTONWUTUN NUSA TENGGARA TIMUR 27 Phase 3 8 6 792 1.5 123.15865 -8.44463 15508 5320040016 JADU NUSA TENGGARA TIMUR 712 Phase 2 166 116 698 25.2 121.78382 -10.55643 15509 5310010015 MASEBEWA NUSA TENGGARA TIMUR 95 Phase 2 28 23 772 5.1 121.99493 -8.72561 15510 5310082015 KOJADOI NUSA TENGGARA TIMUR 70 Phase 3 20 16 980 3.7 122.37265 -8.49377 15511 5304061005 ONI NUSA TENGGARA TIMUR 120 Phase 2 30 21 090 4.6 124.47087 -10.07118 15512 5310010015 MASEBEWA NUSA TENGGARA TIMUR 216 Phase 2 63 53 487 11.5 121.99408 -8.72681 15513 5310082015 KOJADOI NUSA TENGGARA TIMUR 83 Phase 3 24 20 376 4.4 122.36945 -8.49215 15514 5304061006 TUAPAKAS NUSA TENGGARA TIMUR 378 Phase 2 91 63 973 13.8 124.47977 -10.07417 15515 5310012010 DETUBINGA NUSA TENGGARA TIMUR 54 Phase 2 15 12 735 2.7 121.99505 -8.72833 15516 5310082015 KOJADOI NUSA TENGGARA TIMUR 198 Phase 3 57 48 393 10.4 122.34776 -8.48062 15517 5305012004 OEOLO NUSA TENGGARA TIMUR 17 Phase 2 6 4 218 0.9 124.38323 -9.46598 15518 5310012010 DETUBINGA NUSA TENGGARA TIMUR 592 Phase 2 160 135 840 29.3 121.99106 -8.73187 15519 5310041006 NANGATOBONG NUSA TENGGARA TIMUR 25 Phase 3 8 6 792 1.5 122.41985 -8.62202 15520 5305012004 OEOLO NUSA TENGGARA TIMUR 19 Phase 2 6 4 218 0.9 124.38166 -9.45986 15521 5310012010 DETUBINGA NUSA TENGGARA TIMUR 434 Phase 2 117 99 333 21.4 121.99706 -8.72867 15522 5310041006 NANGATOBONG NUSA TENGGARA TIMUR 33 Phase 3 11 9 339 2.0 122.42469 -8.63127 15523 5305024005 NAINABAN NUSA TENGGARA TIMUR 104 Phase 2 30 21 090 4.6 124.37624 -9.45589 15524 5310010015 MASEBEWA NUSA TENGGARA TIMUR 128 Phase 2 38 32 262 7.0 122.00413 -8.72917 Annex II – Demand forecast results Page 65 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 15525 5310041006 NANGATOBONG NUSA TENGGARA TIMUR 77 Phase 3 24 20 376 4.4 122.42537 -8.63437 15526 5305024004 SUNKAEN NUSA TENGGARA TIMUR 402 Phase 2 123 86 469 18.7 124.36948 -9.46319 15527 5310010015 MASEBEWA NUSA TENGGARA TIMUR 35 Phase 2 11 9 339 2.0 122.00863 -8.72567 15528 5308031002 JONTONA NUSA TENGGARA TIMUR 122 Phase 3 31 26 319 5.7 123.50938 -8.29270 15529 5305024005 NAINABAN NUSA TENGGARA TIMUR 143 Phase 2 40 28 120 6.1 124.37590 -9.45279 15530 5310010015 MASEBEWA NUSA TENGGARA TIMUR 441 Phase 2 128 108 672 23.4 122.01058 -8.72538 15531 5307042001 LANGKURU NUSA TENGGARA TIMUR 148 Phase 3 37 31 413 6.8 124.80785 -8.36409 15532 5305024005 NAINABAN NUSA TENGGARA TIMUR 164 Phase 2 46 32 338 7.0 124.37677 -9.44268 15533 5310012014 RENGGARASI NUSA TENGGARA TIMUR 56 Phase 2 12 10 188 2.2 121.98679 -8.72723 15534 5310040019 HIKONG NUSA TENGGARA TIMUR 2 Phase 3 1 849 0.2 122.62498 -8.53485 15535 5305024005 NAINABAN NUSA TENGGARA TIMUR 75 Phase 2 21 14 763 3.2 124.37461 -9.44148 15536 5310012014 RENGGARASI NUSA TENGGARA TIMUR 90 Phase 2 19 16 131 3.5 121.98350 -8.72925 15537 5308011008 PANTAI HARAPAN NUSA TENGGARA TIMUR 46 Phase 3 14 11 886 2.6 123.44746 -8.53488 15538 5305024005 NAINABAN NUSA TENGGARA TIMUR 149 Phase 2 42 29 526 6.4 124.37638 -9.44021 15539 5310012014 RENGGARASI NUSA TENGGARA TIMUR 80 Phase 2 17 14 433 3.1 121.98065 -8.73217 15540 5307020019 PROBUR UTARA NUSA TENGGARA TIMUR 128 Phase 3 29 24 621 5.3 124.40024 -8.32751 15541 5305024005 NAINABAN NUSA TENGGARA TIMUR 63 Phase 2 18 12 654 2.7 124.37803 -9.43944 15542 5310012009 BU SELATAN NUSA TENGGARA TIMUR 67 Phase 2 18 15 282 3.3 121.97873 -8.74038 15543 5307010040 MUNASELI NUSA TENGGARA TIMUR 114 Phase 3 25 21 225 4.6 124.30302 -8.21065 15544 5305024006 INBATE NUSA TENGGARA TIMUR 62 Phase 2 16 11 248 2.4 124.37898 -9.43477 15545 5310012009 BU SELATAN NUSA TENGGARA TIMUR 108 Phase 2 29 24 621 5.3 121.98067 -8.74167 15546 5310082014 WATUGONG NUSA TENGGARA TIMUR 49 Phase 3 14 11 886 2.6 122.22743 -8.69305 15547 5305024006 INBATE NUSA TENGGARA TIMUR 170 Phase 2 43 30 229 6.5 124.38271 -9.43772 15548 5310012009 BU SELATAN NUSA TENGGARA TIMUR 41 Phase 2 11 9 339 2.0 121.98373 -8.74375 15549 5310082014 WATUGONG NUSA TENGGARA TIMUR 15 Phase 3 5 4 245 0.9 122.22769 -8.69453 15550 5305024006 INBATE NUSA TENGGARA TIMUR 255 Phase 2 65 45 695 9.9 124.38808 -9.43715 15551 5310012009 BU SELATAN NUSA TENGGARA TIMUR 116 Phase 2 31 26 319 5.7 121.98139 -8.74692 15552 5310082015 KOJADOI NUSA TENGGARA TIMUR 132 Phase 3 38 32 262 7.0 122.33521 -8.46290 15553 5305024006 INBATE NUSA TENGGARA TIMUR 387 Phase 2 98 68 894 14.9 124.37586 -9.43038 15554 5310012009 BU SELATAN NUSA TENGGARA TIMUR 193 Phase 2 51 43 299 9.3 121.98417 -8.74008 15555 5307020001 HALERMAN NUSA TENGGARA TIMUR 13 Phase 3 3 2 547 0.5 124.41430 -8.43691 15556 5305023005 OENENU NUSA TENGGARA TIMUR 185 Phase 2 54 37 962 8.2 124.45401 -9.42577 15557 5310012009 BU SELATAN NUSA TENGGARA TIMUR 18 Phase 2 5 4 245 0.9 121.98964 -8.74148 15558 5309041004 KALIKE NUSA TENGGARA TIMUR 19 Phase 3 5 4 245 0.9 123.00517 -8.47266 15559 5306031006 KAPITANMEO NUSA TENGGARA TIMUR 114 Phase 2 34 23 902 5.2 124.85122 -9.40584 15560 5310010008 LENANDARETA NUSA TENGGARA TIMUR 96 Phase 2 27 22 923 4.9 121.99398 -8.74223 15561 5309040010 KARAWATUNG NUSA TENGGARA TIMUR 111 Phase 3 31 26 319 5.7 123.00635 -8.46281 15562 5306041003 ALAS NUSA TENGGARA TIMUR 26 Phase 2 8 5 624 1.2 125.03476 -9.38941 15563 5310010008 LENANDARETA NUSA TENGGARA TIMUR 41 Phase 2 12 10 188 2.2 121.99403 -8.74531 15564 5309040010 KARAWATUNG NUSA TENGGARA TIMUR 39 Phase 3 11 9 339 2.0 123.00715 -8.45991 15565 5306041002 KOTABIRU NUSA TENGGARA TIMUR 46 Phase 2 14 9 842 2.1 125.03612 -9.38247 15566 5310010008 LENANDARETA NUSA TENGGARA TIMUR 77 Phase 2 22 18 678 4.0 122.00227 -8.74408 15567 5307030010 KELAISI TIMUR NUSA TENGGARA TIMUR 18 Phase 3 5 4 245 0.9 124.71444 -8.26129 15568 5306041002 KOTABIRU NUSA TENGGARA TIMUR 28 Phase 2 9 6 327 1.4 125.03521 -9.38120 15569 5310010008 LENANDARETA NUSA TENGGARA TIMUR 247 Phase 2 69 58 581 12.6 122.00886 -8.74821 15570 5307030010 KELAISI TIMUR NUSA TENGGARA TIMUR 59 Phase 3 15 12 735 2.7 124.71276 -8.26271 15571 5306041002 KOTABIRU NUSA TENGGARA TIMUR 120 Phase 2 35 24 605 5.3 125.03426 -9.37991 15572 5310010008 LENANDARETA NUSA TENGGARA TIMUR 71 Phase 2 20 16 980 3.7 122.01115 -8.74520 15573 5307030010 KELAISI TIMUR NUSA TENGGARA TIMUR 18 Phase 3 5 4 245 0.9 124.71092 -8.26391 15574 5306041002 KOTABIRU NUSA TENGGARA TIMUR 131 Phase 2 38 26 714 5.8 125.03035 -9.37675 15575 5310010002 MAULOO NUSA TENGGARA TIMUR 69 Phase 2 24 20 376 4.4 122.01596 -8.75087 15576 5309060018 PAJINIAN NUSA TENGGARA TIMUR 79 Phase 3 21 17 829 3.8 123.08431 -8.32321 15577 5306041002 KOTABIRU NUSA TENGGARA TIMUR 66 Phase 2 19 13 357 2.9 125.03065 -9.37534 15578 5310010002 MAULOO NUSA TENGGARA TIMUR 257 Phase 2 87 73 863 15.9 122.02258 -8.75334 15579 5307020001 HALERMAN NUSA TENGGARA TIMUR 68 Phase 3 14 11 886 2.6 124.40587 -8.43860 15580 5306041002 KOTABIRU NUSA TENGGARA TIMUR 99 Phase 2 29 20 387 4.4 125.02921 -9.37441 15581 5310010017 WOLOWONA NUSA TENGGARA TIMUR 156 Phase 2 52 44 148 9.5 122.02815 -8.75739 15582 5307040022 MAUKURU NUSA TENGGARA TIMUR 102 Phase 3 29 24 621 5.3 124.92261 -8.16407 15583 5306041002 KOTABIRU NUSA TENGGARA TIMUR 106 Phase 2 31 21 793 4.7 125.02798 -9.37335 15584 5310010017 WOLOWONA NUSA TENGGARA TIMUR 144 Phase 2 48 40 752 8.8 122.02947 -8.76195 15585 5307040022 MAUKURU NUSA TENGGARA TIMUR 290 Phase 3 81 68 769 14.8 124.92662 -8.16071 15586 5306041002 KOTABIRU NUSA TENGGARA TIMUR 31 Phase 2 9 6 327 1.4 125.02039 -9.36924 15587 5310010017 WOLOWONA NUSA TENGGARA TIMUR 382 Phase 2 127 107 823 23.3 122.03002 -8.76535 15588 5307042003 PURNAMA NUSA TENGGARA TIMUR 114 Phase 3 30 25 470 5.5 124.91256 -8.33536 15589 5306041002 KOTABIRU NUSA TENGGARA TIMUR 239 Phase 2 69 48 507 10.5 125.01791 -9.36847 15590 5310010017 WOLOWONA NUSA TENGGARA TIMUR 10 Phase 2 4 3 396 0.7 122.03524 -8.76670 15591 5307021006 MATARU UTARA NUSA TENGGARA TIMUR 27 Phase 3 6 5 094 1.1 124.62677 -8.35558 15592 5306041002 KOTABIRU NUSA TENGGARA TIMUR 55 Phase 2 16 11 248 2.4 125.02216 -9.36688 15593 5310010004 PAGA NUSA TENGGARA TIMUR 298 Phase 2 66 56 034 12.1 122.03742 -8.76662 15594 5307021006 MATARU UTARA NUSA TENGGARA TIMUR 11 Phase 3 3 2 547 0.5 124.63074 -8.35623 15595 5306041004 ALAS UTARA NUSA TENGGARA TIMUR 121 Phase 2 34 23 902 5.2 125.02248 -9.35748 15596 5310010002 MAULOO NUSA TENGGARA TIMUR 118 Phase 2 40 33 960 7.3 122.02910 -8.76970 15597 5307021005 MATARU TIMUR NUSA TENGGARA TIMUR 26 Phase 3 6 5 094 1.1 124.63434 -8.36330 15598 5306041004 ALAS UTARA NUSA TENGGARA TIMUR 101 Phase 2 29 20 387 4.4 125.02085 -9.35174 15599 5310010002 MAULOO NUSA TENGGARA TIMUR 155 Phase 2 53 44 997 9.7 122.01762 -8.75834 15600 5307021006 MATARU UTARA NUSA TENGGARA TIMUR 76 Phase 3 16 13 584 2.9 124.62334 -8.36970 15601 5306041004 ALAS UTARA NUSA TENGGARA TIMUR 64 Phase 2 18 12 654 2.7 125.01941 -9.35050 15602 5310010002 MAULOO NUSA TENGGARA TIMUR 197 Phase 2 67 56 883 12.3 122.01781 -8.76693 15603 5307021006 MATARU UTARA NUSA TENGGARA TIMUR 25 Phase 3 5 4 245 0.9 124.62295 -8.37098 15604 5306041004 ALAS UTARA NUSA TENGGARA TIMUR 256 Phase 2 72 50 616 10.9 125.01729 -9.35032 15605 5311041004 ROGA NUSA TENGGARA TIMUR 138 Phase 2 43 36 507 7.9 121.78772 -8.80545 15606 5307021006 MATARU UTARA NUSA TENGGARA TIMUR 99 Phase 3 20 16 980 3.7 124.62020 -8.36842 15607 5306041004 ALAS UTARA NUSA TENGGARA TIMUR 136 Phase 2 38 26 714 5.8 125.02321 -9.34630 15608 5319050011 WANGKAR WELI NUSA TENGGARA TIMUR 257 Phase 2 66 56 034 12.1 120.64107 -8.56122 15609 5307021006 MATARU UTARA NUSA TENGGARA TIMUR 68 Phase 3 14 11 886 2.6 124.61681 -8.37365 Annex II – Demand forecast results Page 66 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 15610 5306041004 ALAS UTARA NUSA TENGGARA TIMUR 148 Phase 2 42 29 526 6.4 125.02237 -9.34325 15611 5319050014 TANGO MOLAS NUSA TENGGARA TIMUR 45 Phase 2 11 9 339 2.0 120.61052 -8.57332 15612 5307030004 KIRAMAN NUSA TENGGARA TIMUR 250 Phase 3 67 56 883 12.3 124.78532 -8.39778 15613 5306031005 NAEKEKUSA NUSA TENGGARA TIMUR 51 Phase 2 14 9 842 2.1 124.89679 -9.42212 15614 5319050011 WANGKAR WELI NUSA TENGGARA TIMUR 376 Phase 2 96 81 504 17.6 120.64553 -8.55633 15615 5307042004 LANGKURU UTARA NUSA TENGGARA TIMUR 28 Phase 3 7 5 943 1.3 124.82620 -8.31656 15616 5306031005 NAEKEKUSA NUSA TENGGARA TIMUR 279 Phase 2 75 52 725 11.4 124.89535 -9.42375 15617 5318020003 KOTAWUJI TIMUR NUSA TENGGARA TIMUR 138 Phase 2 34 28 866 6.2 121.30017 -8.88376 15618 5307042004 LANGKURU UTARA NUSA TENGGARA TIMUR 23 Phase 3 6 5 094 1.1 124.82465 -8.31374 15619 5306031005 NAEKEKUSA NUSA TENGGARA TIMUR 147 Phase 2 40 28 120 6.1 124.88987 -9.42591 15620 5310012009 BU SELATAN NUSA TENGGARA TIMUR 63 Phase 2 17 14 433 3.1 121.97088 -8.74298 15621 5307021001 LAKATULI NUSA TENGGARA TIMUR 64 Phase 3 16 13 584 2.9 124.64055 -8.40046 15622 5306031005 NAEKEKUSA NUSA TENGGARA TIMUR 167 Phase 2 45 31 635 6.8 124.88801 -9.42825 15623 5310012009 BU SELATAN NUSA TENGGARA TIMUR 90 Phase 2 24 20 376 4.4 121.97195 -8.74648 15624 5307021001 LAKATULI NUSA TENGGARA TIMUR 151 Phase 3 36 30 564 6.6 124.63320 -8.40628 15625 5304110010 FATUONI NUSA TENGGARA TIMUR 47 Phase 2 15 10 545 2.3 124.70171 -9.67736 15626 5310012009 BU SELATAN NUSA TENGGARA TIMUR 262 Phase 2 69 58 581 12.6 121.96783 -8.74689 15627 5310020001 KOLIDETUNG NUSA TENGGARA TIMUR 102 Phase 3 29 24 621 5.3 122.10708 -8.73419 15628 5304110009 TUMU NUSA TENGGARA TIMUR 170 Phase 2 46 32 338 7.0 124.70009 -9.67738 15629 5319020011 PONG RUAN NUSA TENGGARA TIMUR 106 Phase 2 27 22 923 4.9 120.66066 -8.75465 15630 5307030004 KIRAMAN NUSA TENGGARA TIMUR 165 Phase 3 44 37 356 8.1 124.75051 -8.40045 15631 5304110009 TUMU NUSA TENGGARA TIMUR 170 Phase 2 46 32 338 7.0 124.69764 -9.67929 15632 5315050004 PACAR NUSA TENGGARA TIMUR 147 Phase 2 27 22 923 4.9 120.20256 -8.49222 15633 5307030004 KIRAMAN NUSA TENGGARA TIMUR 32 Phase 3 9 7 641 1.6 124.74983 -8.40049 15634 5304071007 SEI NUSA TENGGARA TIMUR 138 Phase 2 46 32 338 7.0 124.50244 -10.00649 15635 5319050010 NGKIONG DORA NUSA TENGGARA TIMUR 171 Phase 2 41 34 809 7.5 120.65084 -8.54703 15636 5309020011 RATU LODONG NUSA TENGGARA TIMUR 185 Phase 3 37 31 413 6.8 122.87923 -8.12092 15637 5304071007 SEI NUSA TENGGARA TIMUR 44 Phase 2 15 10 545 2.3 124.50124 -10.00881 15638 5319050010 NGKIONG DORA NUSA TENGGARA TIMUR 174 Phase 2 41 34 809 7.5 120.65361 -8.54740 15639 5309020015 WAIBAO NUSA TENGGARA TIMUR 127 Phase 3 25 21 225 4.6 122.79241 -8.20701 15640 5304071007 SEI NUSA TENGGARA TIMUR 167 Phase 2 56 39 368 8.5 124.49753 -10.00785 15641 5319050010 NGKIONG DORA NUSA TENGGARA TIMUR 97 Phase 2 23 19 527 4.2 120.65289 -8.54244 15642 5310082017 PARUMAAN NUSA TENGGARA TIMUR 181 Phase 3 51 43 299 9.3 122.50359 -8.43454 15643 5304110009 TUMU NUSA TENGGARA TIMUR 40 Phase 2 11 7 733 1.7 124.69618 -9.67627 15644 5319040003 SATAR NAWANG NUSA TENGGARA TIMUR 76 Phase 2 26 22 074 4.8 120.65717 -8.53513 15645 5307042003 PURNAMA NUSA TENGGARA TIMUR 313 Phase 3 81 68 769 14.8 124.96639 -8.35808 15646 5304110009 TUMU NUSA TENGGARA TIMUR 34 Phase 2 10 7 030 1.5 124.69227 -9.67625 15647 5319040003 SATAR NAWANG NUSA TENGGARA TIMUR 326 Phase 2 111 94 239 20.3 120.65944 -8.53322 15648 5309041003 LEMANU NUSA TENGGARA TIMUR 43 Phase 3 11 9 339 2.0 122.99707 -8.47323 15649 5304110009 TUMU NUSA TENGGARA TIMUR 434 Phase 2 117 82 251 17.7 124.68599 -9.67759 15650 5319040003 SATAR NAWANG NUSA TENGGARA TIMUR 78 Phase 2 27 22 923 4.9 120.66349 -8.53999 15651 5309040004 LAMAWALANG NUSA TENGGARA TIMUR 80 Phase 3 25 21 225 4.6 122.94820 -8.55800 15652 5304060005 KUANFATU NUSA TENGGARA TIMUR 144 Phase 2 34 23 902 5.2 124.44027 -10.02485 15653 5319040003 SATAR NAWANG NUSA TENGGARA TIMUR 235 Phase 2 80 67 920 14.7 120.67311 -8.54190 15654 5307041002 LIPPANG NUSA TENGGARA TIMUR 26 Phase 3 7 5 943 1.3 124.80031 -8.27356 15655 5306070010 BAUHO NUSA TENGGARA TIMUR 49 Phase 2 16 11 248 2.4 124.98650 -9.09040 15656 5319040003 SATAR NAWANG NUSA TENGGARA TIMUR 61 Phase 2 21 17 829 3.8 120.68028 -8.54920 15657 5308020004 LUSILAME NUSA TENGGARA TIMUR 12 Phase 3 5 4 245 0.9 123.51936 -8.51439 15658 5306070010 BAUHO NUSA TENGGARA TIMUR 223 Phase 2 73 51 319 11.1 124.98470 -9.08683 15659 5319040003 SATAR NAWANG NUSA TENGGARA TIMUR 28 Phase 2 10 8 490 1.8 120.68640 -8.54552 15660 5308020004 LUSILAME NUSA TENGGARA TIMUR 4 Phase 3 2 1 698 0.4 123.51757 -8.51440 15661 5305025009 BANAIN C NUSA TENGGARA TIMUR 451 Phase 2 144 101 232 21.8 124.42487 -9.36003 15662 5319040003 SATAR NAWANG NUSA TENGGARA TIMUR 123 Phase 2 42 35 658 7.7 120.68986 -8.54273 15663 5308020004 LUSILAME NUSA TENGGARA TIMUR 6 Phase 3 3 2 547 0.5 123.51821 -8.51639 15664 5306070009 SARABAU NUSA TENGGARA TIMUR 29 Phase 2 10 7 030 1.5 124.98617 -9.07033 15665 5319040003 SATAR NAWANG NUSA TENGGARA TIMUR 396 Phase 2 134 113 766 24.5 120.69653 -8.54966 15666 5307030009 TAMANAPUI NUSA TENGGARA TIMUR 38 Phase 3 10 8 490 1.8 124.73555 -8.33710 15667 5306070009 SARABAU NUSA TENGGARA TIMUR 54 Phase 2 18 12 654 2.7 124.97370 -9.06447 15668 5319040003 SATAR NAWANG NUSA TENGGARA TIMUR 162 Phase 2 55 46 695 10.1 120.69162 -8.55398 15669 5309071014 NELE LAMAWANGI NUSA TENGGARA TIMUR 182 Phase 3 12 10 188 2.2 123.30266 -8.36340 15670 5306070009 SARABAU NUSA TENGGARA TIMUR 249 Phase 2 79 55 537 12.0 124.96811 -9.06313 15671 5319040003 SATAR NAWANG NUSA TENGGARA TIMUR 15 Phase 2 6 5 094 1.1 120.69143 -8.55477 15672 5308010008 LUSIDUAWUTUN NUSA TENGGARA TIMUR 26 Phase 3 8 6 792 1.5 123.35792 -8.55312 15673 5306070008 SADI NUSA TENGGARA TIMUR 113 Phase 2 31 21 793 4.7 124.96078 -9.06362 15674 5313123004 GOLO LANGKOK NUSA TENGGARA TIMUR 257 Phase 2 57 48 393 10.4 120.42556 -8.55800 15675 5308010008 LUSIDUAWUTUN NUSA TENGGARA TIMUR 30 Phase 3 10 8 490 1.8 123.35519 -8.55486 15676 5306070008 SADI NUSA TENGGARA TIMUR 98 Phase 2 27 18 981 4.1 124.95669 -9.06474 15677 5318020014 LADOLIMA UTARA NUSA TENGGARA TIMUR 96 Phase 2 23 19 527 4.2 121.29978 -8.83926 15678 5307041002 LIPPANG NUSA TENGGARA TIMUR 34 Phase 3 9 7 641 1.6 124.78969 -8.26919 15679 5306070008 SADI NUSA TENGGARA TIMUR 27 Phase 2 8 5 624 1.2 124.95114 -9.06523 15680 5318020014 LADOLIMA UTARA NUSA TENGGARA TIMUR 392 Phase 2 94 79 806 17.2 121.29644 -8.83338 15681 5307041002 LIPPANG NUSA TENGGARA TIMUR 19 Phase 3 6 5 094 1.1 124.78559 -8.26780 15682 5306070008 SADI NUSA TENGGARA TIMUR 542 Phase 2 149 104 747 22.6 124.94589 -9.06918 15683 5319020011 PONG RUAN NUSA TENGGARA TIMUR 84 Phase 2 21 17 829 3.8 120.66347 -8.75364 15684 5307021005 MATARU TIMUR NUSA TENGGARA TIMUR 27 Phase 3 6 5 094 1.1 124.64126 -8.36449 15685 5306070008 SADI NUSA TENGGARA TIMUR 496 Phase 2 136 95 608 20.6 124.94095 -9.06061 15686 5319010007 RANA MASAK NUSA TENGGARA TIMUR 30 Phase 2 8 6 792 1.5 120.66319 -8.74499 15687 5304080007 PISAN NUSA TENGGARA TIMUR 51 Phase 2 15 10 545 2.3 124.59431 -9.76557 15688 5319010007 RANA MASAK NUSA TENGGARA TIMUR 513 Phase 2 135 114 615 24.7 120.65654 -8.74633 15689 5304010010 SEBOT NUSA TENGGARA TIMUR 76 Phase 2 20 14 060 3.0 124.27559 -9.69743 15690 5319010007 RANA MASAK NUSA TENGGARA TIMUR 780 Phase 2 205 174 045 37.6 120.64584 -8.74330 15691 5304010010 SEBOT NUSA TENGGARA TIMUR 109 Phase 2 28 19 684 4.2 124.27329 -9.70221 15692 5311020007 TOMBERABU I NUSA TENGGARA TIMUR 178 Phase 2 51 43 299 9.3 121.67377 -8.75959 15693 5304010010 SEBOT NUSA TENGGARA TIMUR 53 Phase 2 14 9 842 2.1 124.27037 -9.70143 15694 5311020007 TOMBERABU I NUSA TENGGARA TIMUR 86 Phase 2 25 21 225 4.6 121.67949 -8.75417 Annex II – Demand forecast results Page 67 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 15695 5304010010 SEBOT NUSA TENGGARA TIMUR 111 Phase 2 29 20 387 4.4 124.26983 -9.69791 15696 5311020007 TOMBERABU I NUSA TENGGARA TIMUR 250 Phase 2 72 61 128 13.2 121.68265 -8.75478 15697 5304010010 SEBOT NUSA TENGGARA TIMUR 85 Phase 2 22 15 466 3.3 124.27280 -9.70958 15698 5319050009 ULU WAE NUSA TENGGARA TIMUR 202 Phase 2 44 37 356 8.1 120.64376 -8.57946 15699 5304010007 OBESI NUSA TENGGARA TIMUR 22 Phase 2 6 4 218 0.9 124.27907 -9.71590 15700 5319050010 NGKIONG DORA NUSA TENGGARA TIMUR 79 Phase 2 19 16 131 3.5 120.65263 -8.57282 15701 5304010008 EON BESI NUSA TENGGARA TIMUR 165 Phase 2 37 26 011 5.6 124.28567 -9.71946 15702 5319050010 NGKIONG DORA NUSA TENGGARA TIMUR 15 Phase 2 4 3 396 0.7 120.65484 -8.57322 15703 5319050010 NGKIONG DORA NUSA TENGGARA TIMUR 243 Phase 2 57 48 393 10.4 120.65462 -8.57111 15704 5304010009 BOSEN NUSA TENGGARA TIMUR 453 Phase 2 110 77 330 16.7 124.28968 -9.71727 15705 5319050010 NGKIONG DORA NUSA TENGGARA TIMUR 280 Phase 2 66 56 034 12.1 120.65684 -8.56737 15706 5304010008 EON BESI NUSA TENGGARA TIMUR 134 Phase 2 30 21 090 4.6 124.29296 -9.72396 15707 5319050008 RENDE NAO NUSA TENGGARA TIMUR 182 Phase 2 50 42 450 9.2 120.62672 -8.57409 15708 5304010008 EON BESI NUSA TENGGARA TIMUR 65 Phase 2 15 10 545 2.3 124.29635 -9.72289 15709 5319050008 RENDE NAO NUSA TENGGARA TIMUR 85 Phase 2 23 19 527 4.2 120.62983 -8.57340 15710 5304010009 BOSEN NUSA TENGGARA TIMUR 229 Phase 2 56 39 368 8.5 124.29633 -9.72115 15711 5311052007 WOLOARO NUSA TENGGARA TIMUR 61 Phase 2 18 15 282 3.3 121.97132 -8.75103 15712 5304010009 BOSEN NUSA TENGGARA TIMUR 103 Phase 2 25 17 575 3.8 124.30106 -9.71424 15713 5311052007 WOLOARO NUSA TENGGARA TIMUR 132 Phase 2 38 32 262 7.0 121.97060 -8.75388 15714 5304010009 BOSEN NUSA TENGGARA TIMUR 98 Phase 2 24 16 872 3.6 124.30024 -9.71036 15715 5311012007 KOBALEBA NUSA TENGGARA TIMUR 289 Phase 2 109 92 541 20.0 121.58742 -8.58622 15716 5304010009 BOSEN NUSA TENGGARA TIMUR 345 Phase 2 84 59 052 12.7 124.30067 -9.70693 15717 5311012006 NABE NUSA TENGGARA TIMUR 348 Phase 2 90 76 410 16.5 121.58213 -8.58473 15718 5304010009 BOSEN NUSA TENGGARA TIMUR 151 Phase 2 37 26 011 5.6 124.30256 -9.70240 15719 5315030016 PONG MAJOK NUSA TENGGARA TIMUR 121 Phase 2 26 22 074 4.8 120.23411 -8.67798 15720 5304010009 BOSEN NUSA TENGGARA TIMUR 224 Phase 2 55 38 665 8.3 124.30213 -9.70054 15721 5315030020 WAE KANTA NUSA TENGGARA TIMUR 380 Phase 2 83 70 467 15.2 120.22812 -8.67146 15722 5304012001 TOBU NUSA TENGGARA TIMUR 163 Phase 2 43 30 229 6.5 124.30433 -9.69821 15723 5310012009 BU SELATAN NUSA TENGGARA TIMUR 60 Phase 2 16 13 584 2.9 121.96698 -8.75709 15724 5304010009 BOSEN NUSA TENGGARA TIMUR 106 Phase 2 26 18 278 3.9 124.29723 -9.70552 15725 5310012009 BU SELATAN NUSA TENGGARA TIMUR 149 Phase 2 39 33 111 7.1 121.95917 -8.75298 15726 5304012001 TOBU NUSA TENGGARA TIMUR 59 Phase 2 16 11 248 2.4 124.31011 -9.69362 15727 5311052006 DETUPERA NUSA TENGGARA TIMUR 68 Phase 2 22 18 678 4.0 121.95592 -8.76152 15728 5304012001 TOBU NUSA TENGGARA TIMUR 81 Phase 2 21 14 763 3.2 124.31145 -9.69107 15729 5311052006 DETUPERA NUSA TENGGARA TIMUR 91 Phase 2 29 24 621 5.3 121.95210 -8.76614 15730 5304021006 BIJELI NUSA TENGGARA TIMUR 126 Phase 2 36 25 308 5.5 124.31433 -9.68842 15731 5311052003 WOLOSAMBI NUSA TENGGARA TIMUR 128 Phase 2 37 31 413 6.8 121.95377 -8.77419 15732 5304012001 TOBU NUSA TENGGARA TIMUR 15 Phase 2 4 2 812 0.6 124.31161 -9.68509 15733 5311052003 WOLOSAMBI NUSA TENGGARA TIMUR 189 Phase 2 54 45 846 9.9 121.95643 -8.77625 15734 5304021006 BIJELI NUSA TENGGARA TIMUR 30 Phase 2 9 6 327 1.4 124.31533 -9.68329 15735 5311052006 DETUPERA NUSA TENGGARA TIMUR 76 Phase 2 24 20 376 4.4 121.94897 -8.76724 15736 5304021006 BIJELI NUSA TENGGARA TIMUR 126 Phase 2 36 25 308 5.5 124.31754 -9.68114 15737 5311052006 DETUPERA NUSA TENGGARA TIMUR 309 Phase 2 97 82 353 17.8 121.94441 -8.76573 15738 5304021006 BIJELI NUSA TENGGARA TIMUR 373 Phase 2 104 73 112 15.8 124.32171 -9.67746 15739 5311052003 WOLOSAMBI NUSA TENGGARA TIMUR 58 Phase 2 17 14 433 3.1 121.95226 -8.77549 15740 5304012001 TOBU NUSA TENGGARA TIMUR 100 Phase 2 26 18 278 3.9 124.30855 -9.68323 15741 5311052006 DETUPERA NUSA TENGGARA TIMUR 54 Phase 2 17 14 433 3.1 121.94183 -8.76331 15742 5304012001 TOBU NUSA TENGGARA TIMUR 73 Phase 2 19 13 357 2.9 124.30396 -9.67937 15743 5311052008 FATAMARI NUSA TENGGARA TIMUR 188 Phase 2 47 39 903 8.6 121.93765 -8.76210 15744 5304012001 TOBU NUSA TENGGARA TIMUR 435 Phase 2 113 79 439 17.1 124.30140 -9.67645 15745 5311052006 DETUPERA NUSA TENGGARA TIMUR 129 Phase 2 41 34 809 7.5 121.93071 -8.76804 15746 5304012001 TOBU NUSA TENGGARA TIMUR 356 Phase 2 92 64 676 14.0 124.29609 -9.66940 15747 5311052004 LIABEKE NUSA TENGGARA TIMUR 116 Phase 2 33 28 017 6.0 121.92675 -8.77026 15748 5304012001 TOBU NUSA TENGGARA TIMUR 34 Phase 2 9 6 327 1.4 124.29126 -9.66459 15749 5311052004 LIABEKE NUSA TENGGARA TIMUR 139 Phase 2 40 33 960 7.3 121.92420 -8.77323 15750 5304012001 TOBU NUSA TENGGARA TIMUR 30 Phase 2 8 5 624 1.2 124.28600 -9.66445 15751 5311052004 LIABEKE NUSA TENGGARA TIMUR 258 Phase 2 73 61 977 13.4 121.91853 -8.77515 15752 5304012002 TUTEM NUSA TENGGARA TIMUR 64 Phase 2 17 11 951 2.6 124.27690 -9.66466 15753 5311052004 LIABEKE NUSA TENGGARA TIMUR 105 Phase 2 30 25 470 5.5 121.93541 -8.77452 15754 5304012002 TUTEM NUSA TENGGARA TIMUR 91 Phase 2 24 16 872 3.6 124.27261 -9.65965 15755 5311052004 LIABEKE NUSA TENGGARA TIMUR 167 Phase 2 48 40 752 8.8 121.93737 -8.77945 15756 5304012002 TUTEM NUSA TENGGARA TIMUR 540 Phase 2 139 97 717 21.1 124.26637 -9.65494 15757 5311052004 LIABEKE NUSA TENGGARA TIMUR 123 Phase 2 35 29 715 6.4 121.93311 -8.78315 15758 5304012002 TUTEM NUSA TENGGARA TIMUR 506 Phase 2 130 91 390 19.7 124.26814 -9.65075 15759 5311054004 WONDA NUSA TENGGARA TIMUR 456 Phase 2 123 104 427 22.5 121.93744 -8.79081 15760 5304012002 TUTEM NUSA TENGGARA TIMUR 293 Phase 2 76 53 428 11.5 124.25948 -9.65550 15761 5311054004 WONDA NUSA TENGGARA TIMUR 97 Phase 2 27 22 923 4.9 121.93375 -8.79320 15762 5304012002 TUTEM NUSA TENGGARA TIMUR 27 Phase 2 7 4 921 1.1 124.25623 -9.65773 15763 5311054004 WONDA NUSA TENGGARA TIMUR 51 Phase 2 14 11 886 2.6 121.93176 -8.79345 15764 5304011009 KUANOEL NUSA TENGGARA TIMUR 195 Phase 2 52 36 556 7.9 124.25208 -9.65841 15765 5311054004 WONDA NUSA TENGGARA TIMUR 123 Phase 2 34 28 866 6.2 121.92864 -8.79239 15766 5304012002 TUTEM NUSA TENGGARA TIMUR 444 Phase 2 114 80 142 17.3 124.26332 -9.66440 15767 5311054004 WONDA NUSA TENGGARA TIMUR 63 Phase 2 17 14 433 3.1 121.92550 -8.78873 15768 5304051001 OE EKAM NUSA TENGGARA TIMUR 319 Phase 2 71 49 913 10.8 124.28824 -9.98825 15769 5311054004 WONDA NUSA TENGGARA TIMUR 18 Phase 2 5 4 245 0.9 121.92396 -8.78954 15770 5304051001 OE EKAM NUSA TENGGARA TIMUR 114 Phase 2 26 18 278 3.9 124.28565 -9.98969 15771 5311054004 WONDA NUSA TENGGARA TIMUR 107 Phase 2 29 24 621 5.3 121.92050 -8.78569 15772 5304051001 OE EKAM NUSA TENGGARA TIMUR 128 Phase 2 29 20 387 4.4 124.28631 -9.99174 15773 5311054004 WONDA NUSA TENGGARA TIMUR 129 Phase 2 35 29 715 6.4 121.91876 -8.78634 15774 5304110009 TUMU NUSA TENGGARA TIMUR 96 Phase 2 26 18 278 3.9 124.69382 -9.67155 15775 5311050015 WOLOSOKO NUSA TENGGARA TIMUR 221 Phase 2 71 60 279 13.0 121.91013 -8.78545 15776 5304110009 TUMU NUSA TENGGARA TIMUR 77 Phase 2 21 14 763 3.2 124.68920 -9.66705 15777 5311050015 WOLOSOKO NUSA TENGGARA TIMUR 247 Phase 2 79 67 071 14.5 121.90508 -8.78217 15778 5304110009 TUMU NUSA TENGGARA TIMUR 64 Phase 2 18 12 654 2.7 124.68790 -9.66434 15779 5311052003 WOLOSAMBI NUSA TENGGARA TIMUR 173 Phase 2 49 41 601 9.0 121.95285 -8.77908 Annex II – Demand forecast results Page 68 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 15780 5304110009 TUMU NUSA TENGGARA TIMUR 28 Phase 2 8 5 624 1.2 124.68434 -9.66226 15781 5311054004 WONDA NUSA TENGGARA TIMUR 143 Phase 2 39 33 111 7.1 121.92673 -8.79833 15782 5304110009 TUMU NUSA TENGGARA TIMUR 161 Phase 2 44 30 932 6.7 124.68182 -9.65979 15783 5311052004 LIABEKE NUSA TENGGARA TIMUR 86 Phase 2 25 21 225 4.6 121.92546 -8.76847 15784 5304110009 TUMU NUSA TENGGARA TIMUR 36 Phase 2 10 7 030 1.5 124.68058 -9.65666 15785 5311054004 WONDA NUSA TENGGARA TIMUR 35 Phase 2 10 8 490 1.8 121.92395 -8.79107 15786 5304110009 TUMU NUSA TENGGARA TIMUR 38 Phase 2 11 7 733 1.7 124.67638 -9.65048 15787 5311054004 WONDA NUSA TENGGARA TIMUR 90 Phase 2 25 21 225 4.6 121.91638 -8.79562 15788 5304110009 TUMU NUSA TENGGARA TIMUR 32 Phase 2 9 6 327 1.4 124.67600 -9.64866 15789 5311054005 KELISAMBA NUSA TENGGARA TIMUR 513 Phase 2 94 79 806 17.2 121.91132 -8.79780 15790 5304110009 TUMU NUSA TENGGARA TIMUR 49 Phase 2 14 9 842 2.1 124.67475 -9.64677 15791 5311054005 KELISAMBA NUSA TENGGARA TIMUR 135 Phase 2 25 21 225 4.6 121.91084 -8.79515 15792 5304110009 TUMU NUSA TENGGARA TIMUR 504 Phase 2 136 95 608 20.6 124.66856 -9.64764 15793 5311052006 DETUPERA NUSA TENGGARA TIMUR 16 Phase 2 6 5 094 1.1 121.92551 -8.76826 15794 5304082002 BESNAM NUSA TENGGARA TIMUR 16 Phase 2 5 3 515 0.8 124.66146 -9.64785 15795 5319050014 TANGO MOLAS NUSA TENGGARA TIMUR 160 Phase 2 38 32 262 7.0 120.60944 -8.55982 15796 5304082002 BESNAM NUSA TENGGARA TIMUR 290 Phase 2 91 63 973 13.8 124.65624 -9.65113 15797 5312011006 MANUBHARA NUSA TENGGARA TIMUR 766 Phase 2 184 156 216 33.7 120.97719 -8.91043 15798 5304082002 BESNAM NUSA TENGGARA TIMUR 62 Phase 2 20 14 060 3.0 124.65065 -9.65679 15799 5315030020 WAE KANTA NUSA TENGGARA TIMUR 148 Phase 2 33 28 017 6.0 120.24622 -8.66890 15800 5304082003 TAEBONE NUSA TENGGARA TIMUR 142 Phase 2 44 30 932 6.7 124.64677 -9.65936 15801 5319050023 BENTENG RAMPAS NUSA TENGGARA TIMUR 830 Phase 2 149 126 501 27.3 120.64930 -8.52646 15802 5304082003 TAEBONE NUSA TENGGARA TIMUR 27 Phase 2 9 6 327 1.4 124.64260 -9.66367 15803 5319050023 BENTENG RAMPAS NUSA TENGGARA TIMUR 766 Phase 2 138 117 162 25.3 120.64154 -8.52346 15804 5304082003 TAEBONE NUSA TENGGARA TIMUR 90 Phase 2 28 19 684 4.2 124.63846 -9.66874 15805 5310071003 REROROJA NUSA TENGGARA TIMUR 101 Phase 2 22 18 678 4.0 122.03361 -8.54770 15806 5304082003 TAEBONE NUSA TENGGARA TIMUR 53 Phase 2 17 11 951 2.6 124.62551 -9.66190 15807 5319050015 ARUS NUSA TENGGARA TIMUR 52 Phase 2 13 11 037 2.4 120.60576 -8.55337 15808 5304082003 TAEBONE NUSA TENGGARA TIMUR 160 Phase 2 50 35 150 7.6 124.62432 -9.66395 15809 5319050015 ARUS NUSA TENGGARA TIMUR 612 Phase 2 149 126 501 27.3 120.60309 -8.54647 15810 5304082003 TAEBONE NUSA TENGGARA TIMUR 623 Phase 2 193 135 679 29.3 124.62844 -9.64623 15811 5319050015 ARUS NUSA TENGGARA TIMUR 144 Phase 2 35 29 715 6.4 120.60654 -8.54378 15812 5304082003 TAEBONE NUSA TENGGARA TIMUR 195 Phase 2 61 42 883 9.3 124.63595 -9.67458 15813 5311010003 ZOZOZEA NUSA TENGGARA TIMUR 299 Phase 2 68 57 732 12.5 121.51572 -8.78579 15814 5304080010 NIFUKIU NUSA TENGGARA TIMUR 615 Phase 2 166 116 698 25.2 124.64829 -9.68181 15815 5310061006 LADOLAKA NUSA TENGGARA TIMUR 53 Phase 2 14 11 886 2.6 121.70093 -8.29578 15816 5304082003 TAEBONE NUSA TENGGARA TIMUR 41 Phase 2 13 9 139 2.0 124.63245 -9.68276 15817 5319010004 GOLO KANTAR NUSA TENGGARA TIMUR 183 Phase 2 40 33 960 7.3 120.61089 -8.78163 15818 5304080010 NIFUKIU NUSA TENGGARA TIMUR 4 Phase 2 2 1 406 0.3 124.63210 -9.68451 15819 5319010004 GOLO KANTAR NUSA TENGGARA TIMUR 141 Phase 2 31 26 319 5.7 120.61018 -8.77863 15820 5304080010 NIFUKIU NUSA TENGGARA TIMUR 303 Phase 2 82 57 646 12.4 124.62760 -9.69105 15821 5319010007 RANA MASAK NUSA TENGGARA TIMUR 199 Phase 2 53 44 997 9.7 120.63922 -8.75104 15822 5304082001 FATUKOPA NUSA TENGGARA TIMUR 102 Phase 2 29 20 387 4.4 124.62265 -9.69132 15823 5319010005 RANA LOBA NUSA TENGGARA TIMUR 101 Phase 2 19 16 131 3.5 120.63237 -8.74409 15824 5304082003 TAEBONE NUSA TENGGARA TIMUR 152 Phase 2 47 33 041 7.1 124.62113 -9.68322 15825 5319010005 RANA LOBA NUSA TENGGARA TIMUR 75 Phase 2 15 12 735 2.7 120.62908 -8.74495 15826 5304082001 FATUKOPA NUSA TENGGARA TIMUR 138 Phase 2 39 27 417 5.9 124.61413 -9.68357 15827 5319010005 RANA LOBA NUSA TENGGARA TIMUR 67 Phase 2 13 11 037 2.4 120.62717 -8.74587 15828 5304082001 FATUKOPA NUSA TENGGARA TIMUR 362 Phase 2 103 72 409 15.6 124.60525 -9.68560 15829 5319010005 RANA LOBA NUSA TENGGARA TIMUR 16 Phase 2 4 3 396 0.7 120.62512 -8.74585 15830 5304082001 FATUKOPA NUSA TENGGARA TIMUR 17 Phase 2 5 3 515 0.8 124.60017 -9.68628 15831 5319010005 RANA LOBA NUSA TENGGARA TIMUR 74 Phase 2 14 11 886 2.6 120.62467 -8.74677 15832 5304082001 FATUKOPA NUSA TENGGARA TIMUR 73 Phase 2 21 14 763 3.2 124.60065 -9.68192 15833 5319010005 RANA LOBA NUSA TENGGARA TIMUR 492 Phase 2 93 78 957 17.0 120.62346 -8.75646 15834 5304082001 FATUKOPA NUSA TENGGARA TIMUR 20 Phase 2 6 4 218 0.9 124.60210 -9.67799 15835 5319010005 RANA LOBA NUSA TENGGARA TIMUR 401 Phase 2 76 64 524 13.9 120.62556 -8.74027 15836 5304082001 FATUKOPA NUSA TENGGARA TIMUR 128 Phase 2 37 26 011 5.6 124.60150 -9.67164 15837 5315031010 SEMANG NUSA TENGGARA TIMUR 320 Phase 2 67 56 883 12.3 120.21706 -8.56687 15838 5304082001 FATUKOPA NUSA TENGGARA TIMUR 66 Phase 2 19 13 357 2.9 124.59819 -9.67133 15839 5315031010 SEMANG NUSA TENGGARA TIMUR 126 Phase 2 27 22 923 4.9 120.21473 -8.56492 15840 5304082001 FATUKOPA NUSA TENGGARA TIMUR 9 Phase 2 3 2 109 0.5 124.59674 -9.66984 15841 5319020010 RUAN NUSA TENGGARA TIMUR 421 Phase 2 85 72 165 15.6 120.63498 -8.78948 15842 5304082001 FATUKOPA NUSA TENGGARA TIMUR 6 Phase 2 2 1 406 0.3 124.59692 -9.66868 15843 5319020004 KOMBA NUSA TENGGARA TIMUR 108 Phase 2 26 22 074 4.8 120.72002 -8.81260 15844 5304082001 FATUKOPA NUSA TENGGARA TIMUR 74 Phase 2 21 14 763 3.2 124.59885 -9.66891 15845 5319020002 BAMO NUSA TENGGARA TIMUR 432 Phase 2 93 78 957 17.0 120.69790 -8.84574 15846 5304082001 FATUKOPA NUSA TENGGARA TIMUR 18 Phase 2 6 4 218 0.9 124.58521 -9.66414 15847 5319020002 BAMO NUSA TENGGARA TIMUR 826 Phase 2 177 150 273 32.4 120.69854 -8.85050 15848 5304082001 FATUKOPA NUSA TENGGARA TIMUR 103 Phase 2 30 21 090 4.6 124.58161 -9.65753 15849 5319020002 BAMO NUSA TENGGARA TIMUR 80 Phase 2 18 15 282 3.3 120.69983 -8.86972 15850 5304080012 BILLA NUSA TENGGARA TIMUR 11 Phase 2 4 2 812 0.6 124.57655 -9.65969 15851 5319020002 BAMO NUSA TENGGARA TIMUR 727 Phase 2 156 132 444 28.6 120.69585 -8.87357 15852 5304080012 BILLA NUSA TENGGARA TIMUR 29 Phase 2 9 6 327 1.4 124.57620 -9.65949 15853 5319010005 RANA LOBA NUSA TENGGARA TIMUR 52 Phase 2 10 8 490 1.8 120.62488 -8.73740 15854 5304080012 BILLA NUSA TENGGARA TIMUR 163 Phase 2 50 35 150 7.6 124.56963 -9.65655 15855 5319010013 GURUNG LIWUT NUSA TENGGARA TIMUR 50 Phase 2 11 9 339 2.0 120.62516 -8.73407 15856 5304080012 BILLA NUSA TENGGARA TIMUR 136 Phase 2 42 29 526 6.4 124.56900 -9.65173 15857 5319010013 GURUNG LIWUT NUSA TENGGARA TIMUR 96 Phase 2 20 16 980 3.7 120.62474 -8.73302 15858 5304080012 BILLA NUSA TENGGARA TIMUR 22 Phase 2 7 4 921 1.1 124.56453 -9.64919 15859 5319010013 GURUNG LIWUT NUSA TENGGARA TIMUR 549 Phase 2 112 95 088 20.5 120.62267 -8.72768 15860 5304080012 BILLA NUSA TENGGARA TIMUR 776 Phase 2 236 165 908 35.8 124.55737 -9.65124 15861 5311010003 ZOZOZEA NUSA TENGGARA TIMUR 244 Phase 2 55 46 695 10.1 121.51964 -8.78068 15862 5304080012 BILLA NUSA TENGGARA TIMUR 361 Phase 2 110 77 330 16.7 124.57656 -9.67110 15863 5311052005 WOLOLELE A NUSA TENGGARA TIMUR 90 Phase 2 26 22 074 4.8 121.91607 -8.76456 15864 5304082001 FATUKOPA NUSA TENGGARA TIMUR 40 Phase 2 12 8 436 1.8 124.57950 -9.65188 Annex II – Demand forecast results Page 69 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 15865 5311052005 WOLOLELE A NUSA TENGGARA TIMUR 126 Phase 2 36 30 564 6.6 121.91525 -8.75669 15866 5304082001 FATUKOPA NUSA TENGGARA TIMUR 39 Phase 2 12 8 436 1.8 124.58180 -9.64973 15867 5311052005 WOLOLELE A NUSA TENGGARA TIMUR 86 Phase 2 25 21 225 4.6 121.92109 -8.75577 15868 5304082001 FATUKOPA NUSA TENGGARA TIMUR 33 Phase 2 10 7 030 1.5 124.58374 -9.64734 15869 5311052005 WOLOLELE A NUSA TENGGARA TIMUR 74 Phase 2 21 17 829 3.8 121.91942 -8.75138 15870 5304080012 BILLA NUSA TENGGARA TIMUR 226 Phase 2 69 48 507 10.5 124.58411 -9.64330 15871 5311052005 WOLOLELE A NUSA TENGGARA TIMUR 100 Phase 2 29 24 621 5.3 121.92314 -8.75036 15872 5304082001 FATUKOPA NUSA TENGGARA TIMUR 189 Phase 2 54 37 962 8.2 124.58887 -9.64744 15873 5311052005 WOLOLELE A NUSA TENGGARA TIMUR 150 Phase 2 43 36 507 7.9 121.92297 -8.74953 15874 5303190011 BAKUIN NUSA TENGGARA TIMUR 107 Phase 2 27 18 981 4.1 123.91982 -9.44598 15875 5311052005 WOLOLELE A NUSA TENGGARA TIMUR 107 Phase 2 31 26 319 5.7 121.92032 -8.74714 15876 5306080008 DIRUN NUSA TENGGARA TIMUR 33 Phase 2 8 5 624 1.2 125.09255 -9.11506 15877 5310071003 REROROJA NUSA TENGGARA TIMUR 228 Phase 2 49 41 601 9.0 122.02825 -8.55832 15878 5306081007 LOONUNA NUSA TENGGARA TIMUR 17 Phase 2 5 3 515 0.8 125.12213 -9.14729 15879 5319050015 ARUS NUSA TENGGARA TIMUR 261 Phase 2 64 54 336 11.7 120.59886 -8.54910 15880 5306081004 LAKMARAS NUSA TENGGARA TIMUR 95 Phase 2 26 18 278 3.9 125.13922 -9.14396 15881 5319010013 GURUNG LIWUT NUSA TENGGARA TIMUR 176 Phase 2 36 30 564 6.6 120.62084 -8.72236 15882 5306081005 NUALAIN NUSA TENGGARA TIMUR 218 Phase 2 56 39 368 8.5 125.14002 -9.13735 15883 5319010013 GURUNG LIWUT NUSA TENGGARA TIMUR 419 Phase 2 85 72 165 15.6 120.61732 -8.71557 15884 5306081004 LAKMARAS NUSA TENGGARA TIMUR 131 Phase 2 35 24 605 5.3 125.14448 -9.14279 15885 5311040014 PUUTUGA NUSA TENGGARA TIMUR 69 Phase 2 21 17 829 3.8 121.71198 -8.78665 15886 5306081004 LAKMARAS NUSA TENGGARA TIMUR 39 Phase 2 11 7 733 1.7 125.15319 -9.14101 15887 5311040019 KELIKIKU NUSA TENGGARA TIMUR 153 Phase 2 36 30 564 6.6 121.71318 -8.78316 15888 5306081004 LAKMARAS NUSA TENGGARA TIMUR 228 Phase 2 61 42 883 9.3 125.15472 -9.14072 15889 5311070028 RANDORIA NUSA TENGGARA TIMUR 147 Phase 2 45 38 205 8.2 121.70811 -8.78130 15890 5306081004 LAKMARAS NUSA TENGGARA TIMUR 262 Phase 2 70 49 210 10.6 125.15775 -9.13935 15891 5311070028 RANDORIA NUSA TENGGARA TIMUR 199 Phase 2 60 50 940 11.0 121.70310 -8.78665 15892 5306081004 LAKMARAS NUSA TENGGARA TIMUR 65 Phase 2 18 12 654 2.7 125.15903 -9.13836 15893 5311010006 RAPOWAWO NUSA TENGGARA TIMUR 352 Phase 2 80 67 920 14.7 121.52890 -8.78450 15894 5306081004 LAKMARAS NUSA TENGGARA TIMUR 171 Phase 2 46 32 338 7.0 125.16166 -9.14051 15895 5319050015 ARUS NUSA TENGGARA TIMUR 72 Phase 2 18 15 282 3.3 120.59688 -8.54466 15896 5306081003 HENES NUSA TENGGARA TIMUR 323 Phase 2 79 55 537 12.0 125.16321 -9.14926 15897 5319050015 ARUS NUSA TENGGARA TIMUR 253 Phase 2 62 52 638 11.4 120.59519 -8.54024 15898 5306081003 HENES NUSA TENGGARA TIMUR 153 Phase 2 38 26 714 5.8 125.16450 -9.15454 15899 5319010013 GURUNG LIWUT NUSA TENGGARA TIMUR 183 Phase 2 38 32 262 7.0 120.61678 -8.70709 15900 5306081007 LOONUNA NUSA TENGGARA TIMUR 61 Phase 2 16 11 248 2.4 125.12195 -9.14980 15901 5319010013 GURUNG LIWUT NUSA TENGGARA TIMUR 221 Phase 2 45 38 205 8.2 120.61781 -8.70492 15902 5306071004 AITOUN NUSA TENGGARA TIMUR 161 Phase 2 49 34 447 7.4 125.15188 -9.04281 15903 5319010013 GURUNG LIWUT NUSA TENGGARA TIMUR 424 Phase 2 86 73 014 15.8 120.61900 -8.70063 15904 5306011016 NABUTAEK NUSA TENGGARA TIMUR 52 Phase 2 12 8 436 1.8 124.71385 -9.62357 15905 5315030006 SURUNUMBENG NUSA TENGGARA TIMUR 166 Phase 2 37 31 413 6.8 120.22017 -8.75213 15906 5304110009 TUMU NUSA TENGGARA TIMUR 10 Phase 2 3 2 109 0.5 124.69503 -9.68360 15907 5315030007 MUNTING NUSA TENGGARA TIMUR 61 Phase 2 14 11 886 2.6 120.21527 -8.74139 15908 5304110009 TUMU NUSA TENGGARA TIMUR 162 Phase 2 44 30 932 6.7 124.69275 -9.68442 15909 5315030007 MUNTING NUSA TENGGARA TIMUR 69 Phase 2 16 13 584 2.9 120.20460 -8.74277 15910 5304041007 BENLUTU NUSA TENGGARA TIMUR 144 Phase 2 33 23 199 5.0 124.21971 -9.91109 15911 5315030007 MUNTING NUSA TENGGARA TIMUR 89 Phase 2 21 17 829 3.8 120.20393 -8.74673 15912 5304041006 HANE NUSA TENGGARA TIMUR 277 Phase 2 72 50 616 10.9 124.22213 -9.91383 15913 5315030007 MUNTING NUSA TENGGARA TIMUR 87 Phase 2 20 16 980 3.7 120.20080 -8.74445 15914 5304070017 NOEBESA NUSA TENGGARA TIMUR 170 Phase 2 48 33 744 7.3 124.46644 -9.85655 15915 5315030007 MUNTING NUSA TENGGARA TIMUR 88 Phase 2 21 17 829 3.8 120.19835 -8.74392 15916 5304070017 NOEBESA NUSA TENGGARA TIMUR 562 Phase 2 156 109 668 23.7 124.46397 -9.85771 15917 5315030007 MUNTING NUSA TENGGARA TIMUR 211 Phase 2 49 41 601 9.0 120.19701 -8.73560 15918 5303110011 OENESU NUSA TENGGARA TIMUR 137 Phase 2 35 24 605 5.3 123.56902 -10.27452 15919 5315030007 MUNTING NUSA TENGGARA TIMUR 896 Phase 2 206 174 894 37.7 120.18847 -8.73814 15920 5303110011 OENESU NUSA TENGGARA TIMUR 50 Phase 2 13 9 139 2.0 123.57045 -10.27449 15921 5318020014 LADOLIMA UTARA NUSA TENGGARA TIMUR 84 Phase 2 20 16 980 3.7 121.29251 -8.83062 15922 5303110011 OENESU NUSA TENGGARA TIMUR 224 Phase 2 57 40 071 8.6 123.57028 -10.27788 15923 5318030009 KOTAKEO NUSA TENGGARA TIMUR 69 Phase 2 17 14 433 3.1 121.28130 -8.83437 15924 5304101013 BAUS NUSA TENGGARA TIMUR 37 Phase 2 11 7 733 1.7 124.75327 -9.79044 15925 5318030009 KOTAKEO NUSA TENGGARA TIMUR 106 Phase 2 26 22 074 4.8 121.27971 -8.83619 15926 5304101013 BAUS NUSA TENGGARA TIMUR 346 Phase 2 103 72 409 15.6 124.75846 -9.79203 15927 5318030009 KOTAKEO NUSA TENGGARA TIMUR 51 Phase 2 13 11 037 2.4 121.27422 -8.83308 15928 5304012001 TOBU NUSA TENGGARA TIMUR 566 Phase 2 146 102 638 22.1 124.28858 -9.65988 15929 5318030009 KOTAKEO NUSA TENGGARA TIMUR 111 Phase 2 27 22 923 4.9 121.26955 -8.83958 15930 5304111004 SAMBET NUSA TENGGARA TIMUR 209 Phase 2 50 35 150 7.6 124.76679 -9.69272 15931 5318020010 LEWANGERA NUSA TENGGARA TIMUR 164 Phase 2 37 31 413 6.8 121.26525 -8.84216 15932 5304111004 SAMBET NUSA TENGGARA TIMUR 365 Phase 2 87 61 161 13.2 124.77059 -9.70058 15933 5318010016 SELALEJO NUSA TENGGARA TIMUR 50 Phase 2 11 9 339 2.0 121.26301 -8.83877 15934 5305012002 OETULU NUSA TENGGARA TIMUR 74 Phase 2 22 15 466 3.3 124.36471 -9.52022 15935 5318010016 SELALEJO NUSA TENGGARA TIMUR 251 Phase 2 53 44 997 9.7 121.25264 -8.83367 15936 5305010020 NOELTOKO NUSA TENGGARA TIMUR 598 Phase 2 151 106 153 22.9 124.35603 -9.53871 15937 5318010016 SELALEJO NUSA TENGGARA TIMUR 666 Phase 2 141 119 709 25.8 121.24776 -8.83284 15938 5303190009 FATUNAUS NUSA TENGGARA TIMUR 498 Phase 2 117 82 251 17.7 123.85553 -9.49304 15939 5318010016 SELALEJO NUSA TENGGARA TIMUR 501 Phase 2 106 89 994 19.4 121.24369 -8.82900 15940 5304060005 KUANFATU NUSA TENGGARA TIMUR 109 Phase 2 26 18 278 3.9 124.43637 -10.02319 15941 5318010016 SELALEJO NUSA TENGGARA TIMUR 115 Phase 2 25 21 225 4.6 121.24849 -8.82720 15942 5304060005 KUANFATU NUSA TENGGARA TIMUR 111 Phase 2 26 18 278 3.9 124.43609 -10.02163 15943 5318010016 SELALEJO NUSA TENGGARA TIMUR 203 Phase 2 43 36 507 7.9 121.25330 -8.82334 15944 5305025004 NAPAN NUSA TENGGARA TIMUR 5 Phase 2 2 1 406 0.3 124.39793 -9.36195 15945 5313041004 SATAR LENDA NUSA TENGGARA TIMUR 176 Phase 2 38 32 262 7.0 120.31301 -8.83316 15946 5305025004 NAPAN NUSA TENGGARA TIMUR 218 Phase 2 57 40 071 8.6 124.39656 -9.36129 15947 5313041004 SATAR LENDA NUSA TENGGARA TIMUR 232 Phase 2 50 42 450 9.2 120.31235 -8.83576 15948 5306011016 NABUTAEK NUSA TENGGARA TIMUR 12 Phase 2 3 2 109 0.5 124.71033 -9.62491 15949 5313041005 SATAR LUJU NUSA TENGGARA TIMUR 757 Phase 2 161 136 689 29.5 120.31860 -8.83701 Annex II – Demand forecast results Page 70 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 15950 5306011006 NITI NUSA TENGGARA TIMUR 115 Phase 2 28 19 684 4.2 124.70938 -9.62478 15951 5319010013 GURUNG LIWUT NUSA TENGGARA TIMUR 97 Phase 2 20 16 980 3.7 120.61930 -8.69495 15952 5305041010 HUMUSU C NUSA TENGGARA TIMUR 339 Phase 2 78 54 834 11.8 124.49598 -9.19525 15953 5319010013 GURUNG LIWUT NUSA TENGGARA TIMUR 135 Phase 2 28 23 772 5.1 120.62089 -8.69428 15954 5305041010 HUMUSU C NUSA TENGGARA TIMUR 85 Phase 2 20 14 060 3.0 124.49930 -9.19695 15955 5312020010 BEJA NUSA TENGGARA TIMUR 66 Phase 2 15 12 735 2.7 120.95995 -8.84246 15956 5305041010 HUMUSU C NUSA TENGGARA TIMUR 173 Phase 2 40 28 120 6.1 124.50103 -9.19962 15957 5319010011 POCO RII NUSA TENGGARA TIMUR 765 Phase 2 150 127 350 27.5 120.62898 -8.68571 15958 5306022002 TAKARAI NUSA TENGGARA TIMUR 107 Phase 2 29 20 387 4.4 124.89058 -9.50640 15959 5313121006 LONGKO NUSA TENGGARA TIMUR 178 Phase 2 39 33 111 7.1 120.51490 -8.59721 15960 5306022002 TAKARAI NUSA TENGGARA TIMUR 207 Phase 2 56 39 368 8.5 124.88844 -9.50324 15961 5313121006 LONGKO NUSA TENGGARA TIMUR 143 Phase 2 32 27 168 5.9 120.51335 -8.59864 15962 5306020014 BARADA NUSA TENGGARA TIMUR 374 Phase 2 90 63 270 13.7 124.88446 -9.51970 15963 5319050015 ARUS NUSA TENGGARA TIMUR 74 Phase 2 18 15 282 3.3 120.59249 -8.53904 15964 5306020014 BARADA NUSA TENGGARA TIMUR 326 Phase 2 78 54 834 11.8 124.88385 -9.53787 15965 5319050015 ARUS NUSA TENGGARA TIMUR 28 Phase 2 7 5 943 1.3 120.59342 -8.53723 15966 5306020004 KATERI NUSA TENGGARA TIMUR 716 Phase 2 203 142 709 30.8 124.86571 -9.55196 15967 5319050022 WATU ARUS NUSA TENGGARA TIMUR 45 Phase 2 10 8 490 1.8 120.59331 -8.53657 15968 5306071002 TOHE NUSA TENGGARA TIMUR 60 Phase 2 16 11 248 2.4 125.11098 -9.02272 15969 5319050022 WATU ARUS NUSA TENGGARA TIMUR 75 Phase 2 17 14 433 3.1 120.59634 -8.53567 15970 5306071002 TOHE NUSA TENGGARA TIMUR 60 Phase 2 16 11 248 2.4 125.11452 -9.02513 15971 5319050022 WATU ARUS NUSA TENGGARA TIMUR 73 Phase 2 16 13 584 2.9 120.60067 -8.53277 15972 5306071002 TOHE NUSA TENGGARA TIMUR 338 Phase 2 91 63 973 13.8 125.11796 -9.02698 15973 5319050022 WATU ARUS NUSA TENGGARA TIMUR 37 Phase 2 9 7 641 1.6 120.60425 -8.53085 15974 5304061006 TUAPAKAS NUSA TENGGARA TIMUR 201 Phase 2 49 34 447 7.4 124.49694 -10.06056 15975 5319050022 WATU ARUS NUSA TENGGARA TIMUR 23 Phase 2 5 4 245 0.9 120.60866 -8.52897 15976 5304102004 NENOAT NUSA TENGGARA TIMUR 216 Phase 2 59 41 477 8.9 124.69352 -9.89459 15977 5319050022 WATU ARUS NUSA TENGGARA TIMUR 80 Phase 2 18 15 282 3.3 120.61418 -8.52848 15978 5303141004 OEMOFA NUSA TENGGARA TIMUR 26 Phase 2 7 4 921 1.1 124.12440 -10.07971 15979 5319050022 WATU ARUS NUSA TENGGARA TIMUR 420 Phase 2 91 77 259 16.7 120.62055 -8.52228 15980 5303141004 OEMOFA NUSA TENGGARA TIMUR 254 Phase 2 68 47 804 10.3 124.12207 -10.07719 15981 5319050026 LEONG NUSA TENGGARA TIMUR 90 Phase 2 23 19 527 4.2 120.61380 -8.51297 15982 5303141004 OEMOFA NUSA TENGGARA TIMUR 34 Phase 2 10 7 030 1.5 124.12571 -10.07739 15983 5319050026 LEONG NUSA TENGGARA TIMUR 63 Phase 2 16 13 584 2.9 120.61063 -8.50244 15984 5303141009 ENOLANAN NUSA TENGGARA TIMUR 396 Phase 2 105 73 815 15.9 124.13878 -10.07650 15985 5319050026 LEONG NUSA TENGGARA TIMUR 334 Phase 2 83 70 467 15.2 120.60107 -8.50296 15986 5303141009 ENOLANAN NUSA TENGGARA TIMUR 303 Phase 2 81 56 943 12.3 124.15229 -10.07316 15987 5319050026 LEONG NUSA TENGGARA TIMUR 73 Phase 2 19 16 131 3.5 120.59588 -8.49550 15988 5303141009 ENOLANAN NUSA TENGGARA TIMUR 352 Phase 2 94 66 082 14.3 124.16201 -10.07280 15989 5319060002 COMPANG NECAK NUSA TENGGARA TIMUR 661 Phase 2 180 152 820 33.0 120.60603 -8.48913 15990 5303141003 OEMOLO NUSA TENGGARA TIMUR 440 Phase 2 117 82 251 17.7 124.16096 -10.08780 15991 5319060002 COMPANG NECAK NUSA TENGGARA TIMUR 104 Phase 2 29 24 621 5.3 120.61161 -8.48814 15992 5303141003 OEMOLO NUSA TENGGARA TIMUR 230 Phase 2 61 42 883 9.3 124.15321 -10.09363 15993 5319060002 COMPANG NECAK NUSA TENGGARA TIMUR 396 Phase 2 108 91 692 19.8 120.61909 -8.49131 15994 5306011016 NABUTAEK NUSA TENGGARA TIMUR 31 Phase 2 7 4 921 1.1 124.70871 -9.62534 15995 5312010017 KELIGEJO NUSA TENGGARA TIMUR 366 Phase 2 83 70 467 15.2 120.82914 -8.81520 15996 5303160007 NAUNU NUSA TENGGARA TIMUR 126 Phase 2 32 22 496 4.9 123.92245 -10.06287 15997 5319050026 LEONG NUSA TENGGARA TIMUR 77 Phase 2 20 16 980 3.7 120.59423 -8.49252 15998 5303160007 NAUNU NUSA TENGGARA TIMUR 430 Phase 2 109 76 627 16.5 123.92948 -10.07431 15999 5319050023 BENTENG RAMPAS NUSA TENGGARA TIMUR 415 Phase 2 75 63 675 13.7 120.64969 -8.52120 16000 5304071006 OELEU NUSA TENGGARA TIMUR 61 Phase 2 18 12 654 2.7 124.54715 -9.97127 16001 5319050026 LEONG NUSA TENGGARA TIMUR 83 Phase 2 21 17 829 3.8 120.59255 -8.49084 16002 5305041010 HUMUSU C NUSA TENGGARA TIMUR 85 Phase 2 20 14 060 3.0 124.50310 -9.20420 16003 5319050025 WATU LANUR NUSA TENGGARA TIMUR 68 Phase 2 15 12 735 2.7 120.58890 -8.48680 16004 5305041010 HUMUSU C NUSA TENGGARA TIMUR 102 Phase 2 24 16 872 3.6 124.50657 -9.21435 16005 5319050026 LEONG NUSA TENGGARA TIMUR 30 Phase 2 8 6 792 1.5 120.57683 -8.49497 16006 5305026004 MANAMAS NUSA TENGGARA TIMUR 53 Phase 2 14 9 842 2.1 124.50662 -9.22439 16007 5319050026 LEONG NUSA TENGGARA TIMUR 185 Phase 2 46 39 054 8.4 120.57825 -8.49865 16008 5305041010 HUMUSU C NUSA TENGGARA TIMUR 43 Phase 2 10 7 030 1.5 124.50539 -9.23147 16009 5319050026 LEONG NUSA TENGGARA TIMUR 611 Phase 2 151 128 199 27.7 120.58092 -8.50335 16010 5305041010 HUMUSU C NUSA TENGGARA TIMUR 229 Phase 2 53 37 259 8.0 124.50571 -9.23730 16011 5319050026 LEONG NUSA TENGGARA TIMUR 91 Phase 2 23 19 527 4.2 120.58835 -8.51324 16012 5305026004 MANAMAS NUSA TENGGARA TIMUR 53 Phase 2 14 9 842 2.1 124.50203 -9.25834 16013 5319050026 LEONG NUSA TENGGARA TIMUR 260 Phase 2 65 55 185 11.9 120.59059 -8.51351 16014 5305026004 MANAMAS NUSA TENGGARA TIMUR 24 Phase 2 7 4 921 1.1 124.50046 -9.25803 16015 5315031007 GOLO RONGGOT NUSA TENGGARA TIMUR 294 Phase 2 53 44 997 9.7 120.16243 -8.66856 16016 5305026004 MANAMAS NUSA TENGGARA TIMUR 206 Phase 2 53 37 259 8.0 124.49651 -9.26240 16017 5315030014 POCO RUTANG NUSA TENGGARA TIMUR 371 Phase 2 69 58 581 12.6 120.16923 -8.67580 16018 5305026004 MANAMAS NUSA TENGGARA TIMUR 242 Phase 2 62 43 586 9.4 124.49938 -9.26394 16019 5311010006 RAPOWAWO NUSA TENGGARA TIMUR 533 Phase 2 120 101 880 22.0 121.53425 -8.77730 16020 5305026004 MANAMAS NUSA TENGGARA TIMUR 665 Phase 2 170 119 510 25.8 124.50076 -9.26476 16021 5313120009 PONG LEKO NUSA TENGGARA TIMUR 249 Phase 2 65 55 185 11.9 120.34801 -8.61375 16022 5305026003 BENUS NUSA TENGGARA TIMUR 399 Phase 2 85 59 755 12.9 124.50353 -9.26567 16023 5313120009 PONG LEKO NUSA TENGGARA TIMUR 126 Phase 2 33 28 017 6.0 120.35055 -8.61636 16024 5305026003 BENUS NUSA TENGGARA TIMUR 302 Phase 2 64 44 992 9.7 124.50172 -9.26817 16025 5318020002 WITUROMBAUA NUSA TENGGARA TIMUR 148 Phase 2 43 36 507 7.9 121.30163 -8.89325 16026 5304040008 TUBUHUE NUSA TENGGARA TIMUR 377 Phase 2 86 60 458 13.0 124.25517 -9.88463 16027 5319010011 POCO RII NUSA TENGGARA TIMUR 264 Phase 2 52 44 148 9.5 120.63385 -8.68010 16028 5314060008 BOLATENA NUSA TENGGARA TIMUR 1 505 Phase 2 393 276 279 59.6 123.24888 -10.57372 16029 5319010012 GOLO LALONG NUSA TENGGARA TIMUR 46 Phase 2 10 8 490 1.8 120.63001 -8.66856 16030 5303150007 PANTAI BERINGIN NUSA TENGGARA TIMUR 573 Phase 2 159 111 777 24.1 123.67783 -9.98757 16031 5319010011 POCO RII NUSA TENGGARA TIMUR 73 Phase 2 15 12 735 2.7 120.63549 -8.66581 16032 5304081001 SILLU NUSA TENGGARA TIMUR 78 Phase 2 22 15 466 3.3 124.53365 -9.79843 16033 5319010011 POCO RII NUSA TENGGARA TIMUR 64 Phase 2 13 11 037 2.4 120.63964 -8.66099 16034 5304081001 SILLU NUSA TENGGARA TIMUR 140 Phase 2 39 27 417 5.9 124.53988 -9.80000 Annex II – Demand forecast results Page 71 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 16035 5319010011 POCO RII NUSA TENGGARA TIMUR 171 Phase 2 34 28 866 6.2 120.64105 -8.65975 16036 5304082002 BESNAM NUSA TENGGARA TIMUR 29 Phase 2 10 7 030 1.5 124.66362 -9.63940 16037 5319010011 POCO RII NUSA TENGGARA TIMUR 377 Phase 2 74 62 826 13.6 120.65071 -8.65192 16038 5304082002 BESNAM NUSA TENGGARA TIMUR 68 Phase 2 22 15 466 3.3 124.66333 -9.63622 16039 5319010010 BENTENG RIWU NUSA TENGGARA TIMUR 356 Phase 2 76 64 524 13.9 120.65836 -8.65595 16040 5304082002 BESNAM NUSA TENGGARA TIMUR 165 Phase 2 52 36 556 7.9 124.66183 -9.63040 16041 5319010010 BENTENG RIWU NUSA TENGGARA TIMUR 177 Phase 2 38 32 262 7.0 120.65708 -8.65856 16042 5306011007 BOEN NUSA TENGGARA TIMUR 217 Phase 2 59 41 477 8.9 124.66507 -9.62240 16043 5319010010 BENTENG RIWU NUSA TENGGARA TIMUR 60 Phase 2 13 11 037 2.4 120.65589 -8.65980 16044 5306011007 BOEN NUSA TENGGARA TIMUR 88 Phase 2 24 16 872 3.6 124.66331 -9.61817 16045 5319010010 BENTENG RIWU NUSA TENGGARA TIMUR 208 Phase 2 44 37 356 8.1 120.66065 -8.66328 16046 5306011007 BOEN NUSA TENGGARA TIMUR 173 Phase 2 47 33 041 7.1 124.66558 -9.61371 16047 5319010010 BENTENG RIWU NUSA TENGGARA TIMUR 524 Phase 2 111 94 239 20.3 120.66547 -8.65382 16048 5306011009 TAFULI NUSA TENGGARA TIMUR 409 Phase 2 118 82 954 17.9 124.67771 -9.59961 16049 5319010010 BENTENG RIWU NUSA TENGGARA TIMUR 254 Phase 2 54 45 846 9.9 120.66409 -8.64819 16050 5304103002 NOEBANA NUSA TENGGARA TIMUR 70 Phase 2 19 13 357 2.9 124.65465 -9.77041 16051 5319010010 BENTENG RIWU NUSA TENGGARA TIMUR 502 Phase 2 107 90 843 19.6 120.66098 -8.64692 16052 5304103002 NOEBANA NUSA TENGGARA TIMUR 198 Phase 2 53 37 259 8.0 124.65461 -9.77070 16053 5319020014 MOKEL NUSA TENGGARA TIMUR 277 Phase 2 63 53 487 11.5 120.66714 -8.64358 16054 5306011006 NITI NUSA TENGGARA TIMUR 126 Phase 2 30 21 090 4.6 124.70696 -9.62519 16055 5319020014 MOKEL NUSA TENGGARA TIMUR 140 Phase 2 32 27 168 5.9 120.67514 -8.65578 16056 5305041008 HUMUSU B NUSA TENGGARA TIMUR 1 917 Phase 2 467 328 301 70.8 124.58541 -9.22043 16057 5319020014 MOKEL NUSA TENGGARA TIMUR 84 Phase 2 20 16 980 3.7 120.68216 -8.65642 16058 5304010016 TUNUA NUSA TENGGARA TIMUR 43 Phase 2 12 8 436 1.8 124.25091 -9.67550 16059 5319020014 MOKEL NUSA TENGGARA TIMUR 66 Phase 2 15 12 735 2.7 120.68522 -8.66239 16060 5304010016 TUNUA NUSA TENGGARA TIMUR 52 Phase 2 14 9 842 2.1 124.24861 -9.67604 16061 5319020014 MOKEL NUSA TENGGARA TIMUR 287 Phase 2 66 56 034 12.1 120.68075 -8.66722 16062 5304010016 TUNUA NUSA TENGGARA TIMUR 132 Phase 2 35 24 605 5.3 124.24563 -9.67513 16063 5319020014 MOKEL NUSA TENGGARA TIMUR 260 Phase 2 59 50 091 10.8 120.68752 -8.66450 16064 5304010016 TUNUA NUSA TENGGARA TIMUR 97 Phase 2 26 18 278 3.9 124.24819 -9.67760 16065 5319020015 GOLOMENI NUSA TENGGARA TIMUR 787 Phase 2 175 148 575 32.1 120.69117 -8.65732 16066 5304010016 TUNUA NUSA TENGGARA TIMUR 625 Phase 2 162 113 886 24.6 124.24784 -9.68455 16067 5319020015 GOLOMENI NUSA TENGGARA TIMUR 117 Phase 2 27 22 923 4.9 120.69168 -8.65398 16068 5303142006 FATUTETA NUSA TENGGARA TIMUR 76 Phase 2 20 14 060 3.0 123.84825 -10.14178 16069 5319020015 GOLOMENI NUSA TENGGARA TIMUR 128 Phase 2 29 24 621 5.3 120.68778 -8.65059 16070 5306040005 SISI NUSA TENGGARA TIMUR 248 Phase 2 68 47 804 10.3 124.98936 -9.47788 16071 5319020015 GOLOMENI NUSA TENGGARA TIMUR 442 Phase 2 99 84 051 18.1 120.69117 -8.64773 16072 5306040005 SISI NUSA TENGGARA TIMUR 26 Phase 2 8 5 624 1.2 124.98819 -9.47970 16073 5319050022 WATU ARUS NUSA TENGGARA TIMUR 21 Phase 2 5 4 245 0.9 120.59044 -8.53528 16074 5306040005 SISI NUSA TENGGARA TIMUR 192 Phase 2 53 37 259 8.0 124.98613 -9.47848 16075 5319050021 POCONG NUSA TENGGARA TIMUR 264 Phase 2 61 51 789 11.2 120.57836 -8.53440 16076 5304010016 TUNUA NUSA TENGGARA TIMUR 33 Phase 2 9 6 327 1.4 124.24921 -9.67334 16077 5319050021 POCONG NUSA TENGGARA TIMUR 116 Phase 2 27 22 923 4.9 120.57591 -8.53595 16078 5304010016 TUNUA NUSA TENGGARA TIMUR 127 Phase 2 33 23 199 5.0 124.24758 -9.67258 16079 5319050021 POCONG NUSA TENGGARA TIMUR 179 Phase 2 42 35 658 7.7 120.57728 -8.52836 16080 5304041006 HANE NUSA TENGGARA TIMUR 274 Phase 2 71 49 913 10.8 124.20883 -9.93259 16081 5319050024 COMPANG WUNIS NUSA TENGGARA TIMUR 36 Phase 2 10 8 490 1.8 120.65299 -8.50951 16082 5304010016 TUNUA NUSA TENGGARA TIMUR 24 Phase 2 7 4 921 1.1 124.24481 -9.66856 16083 5319050024 COMPANG WUNIS NUSA TENGGARA TIMUR 303 Phase 2 84 71 316 15.4 120.65229 -8.50749 16084 5304010016 TUNUA NUSA TENGGARA TIMUR 21 Phase 2 6 4 218 0.9 124.24442 -9.66646 16085 5319050024 COMPANG WUNIS NUSA TENGGARA TIMUR 18 Phase 2 5 4 245 0.9 120.65792 -8.50019 16086 5304011009 KUANOEL NUSA TENGGARA TIMUR 5 Phase 2 2 1 406 0.3 124.24106 -9.66128 16087 5319050024 COMPANG WUNIS NUSA TENGGARA TIMUR 46 Phase 2 13 11 037 2.4 120.65860 -8.49963 16088 5304011009 KUANOEL NUSA TENGGARA TIMUR 12 Phase 2 4 2 812 0.6 124.24120 -9.65983 16089 5319040006 GOLO WANGKUNG NUSA TENGGARA TIMUR 43 Phase 2 10 8 490 1.8 120.66300 -8.49935 16090 5304011009 KUANOEL NUSA TENGGARA TIMUR 20 Phase 2 6 4 218 0.9 124.23988 -9.65905 16091 5319040006 GOLO WANGKUNG NUSA TENGGARA TIMUR 70 Phase 2 17 14 433 3.1 120.66468 -8.50086 16092 5304011009 KUANOEL NUSA TENGGARA TIMUR 28 Phase 2 8 5 624 1.2 124.23344 -9.66374 16093 5319040006 GOLO WANGKUNG NUSA TENGGARA TIMUR 31 Phase 2 8 6 792 1.5 120.67445 -8.50296 16094 5304011009 KUANOEL NUSA TENGGARA TIMUR 13 Phase 2 4 2 812 0.6 124.23182 -9.66223 16095 5319040006 GOLO WANGKUNG NUSA TENGGARA TIMUR 153 Phase 2 36 30 564 6.6 120.67469 -8.50547 16096 5304011009 KUANOEL NUSA TENGGARA TIMUR 25 Phase 2 7 4 921 1.1 124.22869 -9.65942 16097 5319040006 GOLO WANGKUNG NUSA TENGGARA TIMUR 199 Phase 2 46 39 054 8.4 120.67583 -8.50823 16098 5304011009 KUANOEL NUSA TENGGARA TIMUR 26 Phase 2 7 4 921 1.1 124.22812 -9.65830 16099 5319040006 GOLO WANGKUNG NUSA TENGGARA TIMUR 680 Phase 2 157 133 293 28.8 120.67930 -8.50589 16100 5304011009 KUANOEL NUSA TENGGARA TIMUR 15 Phase 2 4 2 812 0.6 124.22515 -9.65741 16101 5315020017 LIANG NDARA NUSA TENGGARA TIMUR 215 Phase 2 55 46 695 10.1 119.94172 -8.57817 16102 5304011009 KUANOEL NUSA TENGGARA TIMUR 6 Phase 2 2 1 406 0.3 124.22342 -9.65441 16103 5315020017 LIANG NDARA NUSA TENGGARA TIMUR 406 Phase 2 104 88 296 19.1 119.93566 -8.58342 16104 5304011009 KUANOEL NUSA TENGGARA TIMUR 17 Phase 2 5 3 515 0.8 124.22478 -9.65298 16105 5318020002 WITUROMBAUA NUSA TENGGARA TIMUR 90 Phase 2 26 22 074 4.8 121.30795 -8.89072 16106 5304011009 KUANOEL NUSA TENGGARA TIMUR 43 Phase 2 12 8 436 1.8 124.22584 -9.65107 16107 5318020008 KOTADIRUMALI NUSA TENGGARA TIMUR 252 Phase 2 58 49 242 10.6 121.31072 -8.89614 16108 5304011009 KUANOEL NUSA TENGGARA TIMUR 331 Phase 2 89 62 567 13.5 124.22363 -9.65042 16109 5318010004 WULIWALO NUSA TENGGARA TIMUR 86 Phase 2 20 16 980 3.7 121.15828 -8.86907 16110 5304011009 KUANOEL NUSA TENGGARA TIMUR 33 Phase 2 9 6 327 1.4 124.22639 -9.64919 16111 5319040006 GOLO WANGKUNG NUSA TENGGARA TIMUR 188 Phase 2 44 37 356 8.1 120.67714 -8.51167 16112 5304011009 KUANOEL NUSA TENGGARA TIMUR 20 Phase 2 6 4 218 0.9 124.22707 -9.64659 16113 5310010016 WOLOREGA NUSA TENGGARA TIMUR 39 Phase 2 14 11 886 2.6 122.00658 -8.66509 16114 5304011009 KUANOEL NUSA TENGGARA TIMUR 15 Phase 2 4 2 812 0.6 124.22622 -9.64448 16115 5310011004 WOLODHESA NUSA TENGGARA TIMUR 54 Phase 2 14 11 886 2.6 122.01249 -8.66430 16116 5304011009 KUANOEL NUSA TENGGARA TIMUR 17 Phase 2 5 3 515 0.8 124.22517 -9.64447 16117 5310011004 WOLODHESA NUSA TENGGARA TIMUR 195 Phase 2 49 41 601 9.0 122.02489 -8.66392 16118 5304011009 KUANOEL NUSA TENGGARA TIMUR 54 Phase 2 15 10 545 2.3 124.22350 -9.64367 16119 5310011004 WOLODHESA NUSA TENGGARA TIMUR 702 Phase 2 177 150 273 32.4 122.03274 -8.66766 Annex II – Demand forecast results Page 72 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 16120 5304011009 KUANOEL NUSA TENGGARA TIMUR 65 Phase 2 18 12 654 2.7 124.22156 -9.64466 16121 5315040017 KOLANG NUSA TENGGARA TIMUR 141 Phase 2 32 27 168 5.9 120.25674 -8.56908 16122 5304011009 KUANOEL NUSA TENGGARA TIMUR 144 Phase 2 39 27 417 5.9 124.21997 -9.64571 16123 5319040006 GOLO WANGKUNG NUSA TENGGARA TIMUR 146 Phase 2 34 28 866 6.2 120.67660 -8.51478 16124 5304011004 FATUMNASI NUSA TENGGARA TIMUR 564 Phase 2 150 105 450 22.8 124.20868 -9.60250 16125 5318020008 KOTADIRUMALI NUSA TENGGARA TIMUR 270 Phase 2 62 52 638 11.4 121.31282 -8.90184 16126 5304011004 FATUMNASI NUSA TENGGARA TIMUR 179 Phase 2 48 33 744 7.3 124.20587 -9.59467 16127 5318020008 KOTADIRUMALI NUSA TENGGARA TIMUR 150 Phase 2 35 29 715 6.4 121.31137 -8.90959 16128 5304011004 FATUMNASI NUSA TENGGARA TIMUR 103 Phase 2 28 19 684 4.2 124.20714 -9.59164 16129 5318020002 WITUROMBAUA NUSA TENGGARA TIMUR 441 Phase 2 128 108 672 23.4 121.30639 -8.90767 16130 5304011004 FATUMNASI NUSA TENGGARA TIMUR 689 Phase 2 183 128 649 27.8 124.20864 -9.59096 16131 5318020002 WITUROMBAUA NUSA TENGGARA TIMUR 53 Phase 2 16 13 584 2.9 121.30434 -8.90781 16132 5304011007 NENAS NUSA TENGGARA TIMUR 127 Phase 2 28 19 684 4.2 124.20689 -9.58968 16133 5319050025 WATU LANUR NUSA TENGGARA TIMUR 88 Phase 2 19 16 131 3.5 120.58857 -8.48563 16134 5304011007 NENAS NUSA TENGGARA TIMUR 153 Phase 2 33 23 199 5.0 124.20576 -9.58940 16135 5315030007 MUNTING NUSA TENGGARA TIMUR 64 Phase 2 15 12 735 2.7 120.20627 -8.74813 16136 5304011007 NENAS NUSA TENGGARA TIMUR 461 Phase 2 99 69 597 15.0 124.20570 -9.58675 16137 5315040002 RANGGU NUSA TENGGARA TIMUR 113 Phase 2 27 22 923 4.9 120.25938 -8.57385 16138 5304011007 NENAS NUSA TENGGARA TIMUR 151 Phase 2 33 23 199 5.0 124.18960 -9.56004 16139 5315040005 COMPANG SUKA NUSA TENGGARA TIMUR 22 Phase 2 6 5 094 1.1 120.26513 -8.56778 16140 5304011007 NENAS NUSA TENGGARA TIMUR 403 Phase 2 87 61 161 13.2 124.18693 -9.55988 16141 5315040005 COMPANG SUKA NUSA TENGGARA TIMUR 170 Phase 2 40 33 960 7.3 120.26706 -8.56794 16142 5304011007 NENAS NUSA TENGGARA TIMUR 210 Phase 2 46 32 338 7.0 124.18637 -9.56214 16143 5315040017 KOLANG NUSA TENGGARA TIMUR 217 Phase 2 49 41 601 9.0 120.26426 -8.56151 16144 5304011007 NENAS NUSA TENGGARA TIMUR 117 Phase 2 26 18 278 3.9 124.18225 -9.54895 16145 5319040006 GOLO WANGKUNG NUSA TENGGARA TIMUR 21 Phase 2 5 4 245 0.9 120.67636 -8.51789 16146 5304011007 NENAS NUSA TENGGARA TIMUR 383 Phase 2 83 58 349 12.6 124.18004 -9.54688 16147 5319040004 GOLO NGAWAN NUSA TENGGARA TIMUR 154 Phase 2 37 31 413 6.8 120.68305 -8.52408 16148 5304011008 NUAPIN NUSA TENGGARA TIMUR 26 Phase 2 6 4 218 0.9 124.17774 -9.52860 16149 5319040004 GOLO NGAWAN NUSA TENGGARA TIMUR 84 Phase 2 21 17 829 3.8 120.68801 -8.52803 16150 5304011008 NUAPIN NUSA TENGGARA TIMUR 75 Phase 2 17 11 951 2.6 124.17567 -9.52743 16151 5319040004 GOLO NGAWAN NUSA TENGGARA TIMUR 750 Phase 2 180 152 820 33.0 120.69487 -8.52859 16152 5304011008 NUAPIN NUSA TENGGARA TIMUR 89 Phase 2 20 14 060 3.0 124.17143 -9.52741 16153 5319040002 RANA MESE NUSA TENGGARA TIMUR 358 Phase 2 99 84 051 18.1 120.70772 -8.53485 16154 5304011008 NUAPIN NUSA TENGGARA TIMUR 77 Phase 2 18 12 654 2.7 124.16938 -9.52803 16155 5319040002 RANA MESE NUSA TENGGARA TIMUR 496 Phase 2 138 117 162 25.3 120.71175 -8.54261 16156 5304011008 NUAPIN NUSA TENGGARA TIMUR 1 315 Phase 2 295 207 385 44.7 124.16453 -9.52932 16157 5319040002 RANA MESE NUSA TENGGARA TIMUR 113 Phase 2 32 27 168 5.9 120.71642 -8.54446 16158 5304011008 NUAPIN NUSA TENGGARA TIMUR 83 Phase 2 19 13 357 2.9 124.17168 -9.52937 16159 5319040002 RANA MESE NUSA TENGGARA TIMUR 333 Phase 2 93 78 957 17.0 120.71866 -8.54585 16160 5304011008 NUAPIN NUSA TENGGARA TIMUR 53 Phase 2 12 8 436 1.8 124.18308 -9.52175 16161 5319040002 RANA MESE NUSA TENGGARA TIMUR 349 Phase 2 97 82 353 17.8 120.71610 -8.55259 16162 5304011008 NUAPIN NUSA TENGGARA TIMUR 153 Phase 2 35 24 605 5.3 124.18522 -9.52272 16163 5319040001 COMPANG CONGKAR NUSA TENGGARA TIMUR 399 Phase 2 93 78 957 17.0 120.71797 -8.56492 16164 5305013004 NOELELO NUSA TENGGARA TIMUR 140 Phase 2 34 23 902 5.2 124.16321 -9.45132 16165 5319040001 COMPANG CONGKAR NUSA TENGGARA TIMUR 635 Phase 2 147 124 803 26.9 120.72833 -8.56669 16166 5305013004 NOELELO NUSA TENGGARA TIMUR 383 Phase 2 93 65 379 14.1 124.16201 -9.44518 16167 5319040001 COMPANG CONGKAR NUSA TENGGARA TIMUR 226 Phase 2 53 44 997 9.7 120.70959 -8.56937 16168 5305013004 NOELELO NUSA TENGGARA TIMUR 138 Phase 2 34 23 902 5.2 124.16383 -9.44397 16169 5319050025 WATU LANUR NUSA TENGGARA TIMUR 347 Phase 2 74 62 826 13.6 120.59120 -8.48148 16170 5305013003 NAEKAKE B NUSA TENGGARA TIMUR 34 Phase 2 10 7 030 1.5 124.19550 -9.42784 16171 5311050026 LISEDETU NUSA TENGGARA TIMUR 48 Phase 2 11 9 339 2.0 121.88387 -8.75737 16172 5305013003 NAEKAKE B NUSA TENGGARA TIMUR 732 Phase 2 215 151 145 32.6 124.19693 -9.42924 16173 5311050038 NIRAMESI NUSA TENGGARA TIMUR 63 Phase 2 16 13 584 2.9 121.88069 -8.75304 16174 5305013002 NAEKAKE A NUSA TENGGARA TIMUR 376 Phase 2 99 69 597 15.0 124.20070 -9.42714 16175 5311050038 NIRAMESI NUSA TENGGARA TIMUR 250 Phase 2 62 52 638 11.4 121.87883 -8.75098 16176 5305013002 NAEKAKE A NUSA TENGGARA TIMUR 324 Phase 2 86 60 458 13.0 124.20563 -9.43049 16177 5311050038 NIRAMESI NUSA TENGGARA TIMUR 69 Phase 2 17 14 433 3.1 121.88467 -8.75069 16178 5305013002 NAEKAKE A NUSA TENGGARA TIMUR 196 Phase 2 52 36 556 7.9 124.21233 -9.42559 16179 5311050038 NIRAMESI NUSA TENGGARA TIMUR 97 Phase 2 24 20 376 4.4 121.88950 -8.74916 16180 5305013002 NAEKAKE A NUSA TENGGARA TIMUR 221 Phase 2 59 41 477 8.9 124.21807 -9.42478 16181 5311050038 NIRAMESI NUSA TENGGARA TIMUR 219 Phase 2 54 45 846 9.9 121.89264 -8.74597 16182 5305013001 TASINIFU NUSA TENGGARA TIMUR 543 Phase 2 133 93 499 20.2 124.24246 -9.42247 16183 5311050038 NIRAMESI NUSA TENGGARA TIMUR 205 Phase 2 51 43 299 9.3 121.89241 -8.73744 16184 5305013001 TASINIFU NUSA TENGGARA TIMUR 385 Phase 3 94 66 082 14.3 124.24554 -9.42503 16185 5311050033 LISELOWOBORA NUSA TENGGARA TIMUR 142 Phase 2 31 26 319 5.7 121.89048 -8.75696 16186 5305013001 TASINIFU NUSA TENGGARA TIMUR 1 584 Phase 3 386 271 358 58.6 124.24772 -9.42203 16187 5311050033 LISELOWOBORA NUSA TENGGARA TIMUR 270 Phase 2 58 49 242 10.6 121.89270 -8.76209 16188 5305013001 TASINIFU NUSA TENGGARA TIMUR 924 Phase 3 225 158 175 34.1 124.25120 -9.42507 16189 5313040036 JAONG NUSA TENGGARA TIMUR 266 Phase 2 63 53 487 11.5 120.36681 -8.65482 16190 5305013001 TASINIFU NUSA TENGGARA TIMUR 209 Phase 3 51 35 853 7.7 124.24803 -9.42090 16191 5318020011 WAJO NUSA TENGGARA TIMUR 158 Phase 2 36 30 564 6.6 121.27993 -8.84274 16192 5305013002 NAEKAKE A NUSA TENGGARA TIMUR 445 Phase 3 118 82 954 17.9 124.20783 -9.42195 16193 5313130019 WAE CODI NUSA TENGGARA TIMUR 190 Phase 2 41 34 809 7.5 120.44936 -8.47685 16194 5304011008 NUAPIN NUSA TENGGARA TIMUR 69 Phase 3 16 11 248 2.4 124.18631 -9.52416 16195 5319010001 BEA NGENCUNG NUSA TENGGARA TIMUR 168 Phase 2 40 33 960 7.3 120.53989 -8.80970 16196 5304011008 NUAPIN NUSA TENGGARA TIMUR 61 Phase 3 14 9 842 2.1 124.18887 -9.52543 16197 5319010004 GOLO KANTAR NUSA TENGGARA TIMUR 445 Phase 2 96 81 504 17.6 120.59262 -8.76512 16198 5304011008 NUAPIN NUSA TENGGARA TIMUR 59 Phase 3 14 9 842 2.1 124.18831 -9.52701 16199 5319010004 GOLO KANTAR NUSA TENGGARA TIMUR 358 Phase 2 77 65 373 14.1 120.59416 -8.77150 16200 5304051003 OEPLIKI NUSA TENGGARA TIMUR 74 Phase 3 21 14 763 3.2 124.33722 -9.92594 16201 5319050025 WATU LANUR NUSA TENGGARA TIMUR 490 Phase 2 104 88 296 19.1 120.58873 -8.47879 16202 5304060005 KUANFATU NUSA TENGGARA TIMUR 214 Phase 3 50 35 150 7.6 124.43003 -10.02759 16203 5315050002 COMPANG NUSA TENGGARA TIMUR 107 Phase 2 23 19 527 4.2 120.21834 -8.54754 16204 5304060005 KUANFATU NUSA TENGGARA TIMUR 186 Phase 3 44 30 932 6.7 124.43427 -10.03059 Annex II – Demand forecast results Page 73 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 16205 5315050002 COMPANG NUSA TENGGARA TIMUR 266 Phase 2 55 46 695 10.1 120.20974 -8.55177 16206 5306031005 NAEKEKUSA NUSA TENGGARA TIMUR 77 Phase 3 21 14 763 3.2 124.88839 -9.43063 16207 5315050002 COMPANG NUSA TENGGARA TIMUR 262 Phase 2 54 45 846 9.9 120.20370 -8.54111 16208 5304040008 TUBUHUE NUSA TENGGARA TIMUR 11 Phase 3 3 2 109 0.5 124.25372 -9.88658 16209 5315050002 COMPANG NUSA TENGGARA TIMUR 154 Phase 2 32 27 168 5.9 120.19570 -8.53247 16210 5304040008 TUBUHUE NUSA TENGGARA TIMUR 210 Phase 3 48 33 744 7.3 124.25210 -9.88992 16211 5315050002 COMPANG NUSA TENGGARA TIMUR 62 Phase 2 13 11 037 2.4 120.19432 -8.53332 16212 5304102003 SAHAN NUSA TENGGARA TIMUR 78 Phase 3 22 15 466 3.3 124.67533 -9.89705 16213 5315050002 COMPANG NUSA TENGGARA TIMUR 223 Phase 2 46 39 054 8.4 120.18810 -8.53408 16214 5303142002 FATUKNUTU NUSA TENGGARA TIMUR 243 Phase 3 64 44 992 9.7 123.89056 -10.18363 16215 5315050002 COMPANG NUSA TENGGARA TIMUR 286 Phase 2 59 50 091 10.8 120.18533 -8.53400 16216 5304102004 NENOAT NUSA TENGGARA TIMUR 194 Phase 3 53 37 259 8.0 124.69911 -9.88823 16217 5315050002 COMPANG NUSA TENGGARA TIMUR 170 Phase 2 36 30 564 6.6 120.18690 -8.52761 16218 5304040008 TUBUHUE NUSA TENGGARA TIMUR 256 Phase 3 59 41 477 8.9 124.25451 -9.89331 16219 5315050002 COMPANG NUSA TENGGARA TIMUR 381 Phase 2 79 67 071 14.5 120.18265 -8.52786 16220 5304010016 TUNUA NUSA TENGGARA TIMUR 26 Phase 3 7 4 921 1.1 124.24902 -9.67148 16221 5313130022 LADUR NUSA TENGGARA TIMUR 131 Phase 2 33 28 017 6.0 120.49308 -8.41978 16222 5304010016 TUNUA NUSA TENGGARA TIMUR 52 Phase 3 14 9 842 2.1 124.25065 -9.67068 16223 5313130022 LADUR NUSA TENGGARA TIMUR 296 Phase 2 73 61 977 13.4 120.48894 -8.40676 16224 5304010008 EON BESI NUSA TENGGARA TIMUR 1 357 Phase 3 304 213 712 46.1 124.29074 -9.72885 16225 5313130022 LADUR NUSA TENGGARA TIMUR 351 Phase 2 87 73 863 15.9 120.49353 -8.39822 16226 5305050012 SAINIUP NUSA TENGGARA TIMUR 22 Phase 3 6 4 218 0.9 124.69230 -9.34945 16227 5319020015 GOLOMENI NUSA TENGGARA TIMUR 409 Phase 2 91 77 259 16.7 120.69255 -8.65752 16228 5305050012 SAINIUP NUSA TENGGARA TIMUR 88 Phase 3 22 15 466 3.3 124.68396 -9.34753 16229 5313130026 GOLO LANAK NUSA TENGGARA TIMUR 72 Phase 2 17 14 433 3.1 120.42935 -8.43300 16230 5305050012 SAINIUP NUSA TENGGARA TIMUR 508 Phase 3 127 89 281 19.3 124.68459 -9.35382 16231 5313130024 LATUNG NUSA TENGGARA TIMUR 59 Phase 2 13 11 037 2.4 120.43458 -8.43132 16232 5304012001 TOBU NUSA TENGGARA TIMUR 20 Phase 3 6 4 218 0.9 124.28400 -9.65097 16233 5313130024 LATUNG NUSA TENGGARA TIMUR 37 Phase 2 9 7 641 1.6 120.43523 -8.42991 16234 5304012001 TOBU NUSA TENGGARA TIMUR 240 Phase 3 62 43 586 9.4 124.28263 -9.65170 16235 5313130024 LATUNG NUSA TENGGARA TIMUR 170 Phase 2 38 32 262 7.0 120.44159 -8.42104 16236 5304012001 TOBU NUSA TENGGARA TIMUR 30 Phase 3 8 5 624 1.2 124.28471 -9.64795 16237 5313130024 LATUNG NUSA TENGGARA TIMUR 114 Phase 2 26 22 074 4.8 120.43182 -8.41891 16238 5304012001 TOBU NUSA TENGGARA TIMUR 56 Phase 3 15 10 545 2.3 124.28491 -9.64625 16239 5313130026 GOLO LANAK NUSA TENGGARA TIMUR 410 Phase 2 96 81 504 17.6 120.42679 -8.42052 16240 5304012003 TUNE NUSA TENGGARA TIMUR 55 Phase 3 15 10 545 2.3 124.28454 -9.64176 16241 5311054005 KELISAMBA NUSA TENGGARA TIMUR 51 Phase 2 10 8 490 1.8 121.90850 -8.80241 16242 5304012003 TUNE NUSA TENGGARA TIMUR 143 Phase 3 38 26 714 5.8 124.28014 -9.64436 16243 5311050016 BOKASAPE TIMUR NUSA TENGGARA TIMUR 29 Phase 2 8 6 792 1.5 121.90826 -8.80251 16244 5304012002 TUTEM NUSA TENGGARA TIMUR 215 Phase 3 56 39 368 8.5 124.27889 -9.64606 16245 5311050016 BOKASAPE TIMUR NUSA TENGGARA TIMUR 49 Phase 2 14 11 886 2.6 121.90537 -8.79860 16246 5304090014 FALLAS NUSA TENGGARA TIMUR 149 Phase 3 40 28 120 6.1 124.51326 -9.80086 16247 5311050016 BOKASAPE TIMUR NUSA TENGGARA TIMUR 190 Phase 2 52 44 148 9.5 121.89964 -8.79969 16248 5304081002 OELEON NUSA TENGGARA TIMUR 25 Phase 3 7 4 921 1.1 124.58807 -9.78245 16249 5311050016 BOKASAPE TIMUR NUSA TENGGARA TIMUR 145 Phase 2 40 33 960 7.3 121.89825 -8.79390 16250 5303141010 OENAUNU NUSA TENGGARA TIMUR 968 Phase 3 252 177 156 38.2 124.13538 -10.05567 16251 5311010006 RAPOWAWO NUSA TENGGARA TIMUR 149 Phase 2 34 28 866 6.2 121.53078 -8.76871 16252 5306022002 TAKARAI NUSA TENGGARA TIMUR 30 Phase 3 9 6 327 1.4 124.88119 -9.50307 16253 5311010006 RAPOWAWO NUSA TENGGARA TIMUR 437 Phase 2 99 84 051 18.1 121.52704 -8.77090 16254 5306022003 BABOTIN SELATAN NUSA TENGGARA TIMUR 14 Phase 3 5 3 515 0.8 124.87515 -9.50224 16255 5311010006 RAPOWAWO NUSA TENGGARA TIMUR 107 Phase 2 25 21 225 4.6 121.52543 -8.76854 16256 5306022003 BABOTIN SELATAN NUSA TENGGARA TIMUR 53 Phase 3 17 11 951 2.6 124.87448 -9.50224 16257 5315050002 COMPANG NUSA TENGGARA TIMUR 239 Phase 2 50 42 450 9.2 120.18534 -8.53559 16258 5306022003 BABOTIN SELATAN NUSA TENGGARA TIMUR 185 Phase 3 58 40 774 8.8 124.86960 -9.50067 16259 5315050002 COMPANG NUSA TENGGARA TIMUR 507 Phase 2 105 89 145 19.2 120.18445 -8.54352 16260 5306022003 BABOTIN SELATAN NUSA TENGGARA TIMUR 90 Phase 3 28 19 684 4.2 124.86926 -9.49946 16261 5315040023 WANING NUSA TENGGARA TIMUR 337 Phase 2 67 56 883 12.3 120.29867 -8.46775 16262 5303162001 KALALI NUSA TENGGARA TIMUR 357 Phase 3 78 54 834 11.8 123.68504 -9.94460 16263 5315020008 GOLO KEMPO NUSA TENGGARA TIMUR 465 Phase 2 111 94 239 20.3 120.05465 -8.64061 16264 5303162001 KALALI NUSA TENGGARA TIMUR 769 Phase 3 169 118 807 25.6 123.68481 -9.93466 16265 5313040011 LEGU NUSA TENGGARA TIMUR 126 Phase 2 28 23 772 5.1 120.43331 -8.80184 16266 5303162002 POTO NUSA TENGGARA TIMUR 57 Phase 3 14 9 842 2.1 123.66957 -9.92922 16267 5313040011 LEGU NUSA TENGGARA TIMUR 338 Phase 2 73 61 977 13.4 120.43321 -8.79549 16268 5303162002 POTO NUSA TENGGARA TIMUR 156 Phase 3 36 25 308 5.5 123.66714 -9.92764 16269 5310071003 REROROJA NUSA TENGGARA TIMUR 70 Phase 2 15 12 735 2.7 122.02416 -8.56099 16270 5303162002 POTO NUSA TENGGARA TIMUR 56 Phase 3 13 9 139 2.0 123.66539 -9.92566 16271 5310071005 DONE NUSA TENGGARA TIMUR 933 Phase 2 221 187 629 40.5 122.02773 -8.57964 16272 5303162002 POTO NUSA TENGGARA TIMUR 88 Phase 3 21 14 763 3.2 123.65779 -9.91944 16273 5315030010 WAE MOSE NUSA TENGGARA TIMUR 226 Phase 2 59 50 091 10.8 120.17505 -8.72002 16274 5303162002 POTO NUSA TENGGARA TIMUR 86 Phase 3 20 14 060 3.0 123.65447 -9.91586 16275 5315020013 WATU WANGKA NUSA TENGGARA TIMUR 25 Phase 2 6 5 094 1.1 120.07225 -8.61222 16276 5303162002 POTO NUSA TENGGARA TIMUR 88 Phase 3 21 14 763 3.2 123.65261 -9.91469 16277 5315020013 WATU WANGKA NUSA TENGGARA TIMUR 122 Phase 2 29 24 621 5.3 120.08574 -8.61078 16278 5303162002 POTO NUSA TENGGARA TIMUR 175 Phase 3 41 28 823 6.2 123.64925 -9.90987 16279 5315020014 WAE JARE NUSA TENGGARA TIMUR 270 Phase 2 68 57 732 12.5 120.09331 -8.61940 16280 5303162002 POTO NUSA TENGGARA TIMUR 447 Phase 3 103 72 409 15.6 123.64556 -9.89647 16281 5315020014 WAE JARE NUSA TENGGARA TIMUR 742 Phase 2 187 158 763 34.3 120.10850 -8.62719 16282 5303162002 POTO NUSA TENGGARA TIMUR 621 Phase 3 143 100 529 21.7 123.65450 -9.89133 16283 5315050006 WONTONG NUSA TENGGARA TIMUR 478 Phase 2 96 81 504 17.6 120.27100 -8.43510 16284 5303162002 POTO NUSA TENGGARA TIMUR 156 Phase 3 36 25 308 5.5 123.65552 -9.87961 16285 5319020015 GOLOMENI NUSA TENGGARA TIMUR 209 Phase 2 47 39 903 8.6 120.69488 -8.66037 16286 5303162003 NAITAE NUSA TENGGARA TIMUR 461 Phase 3 99 69 597 15.0 123.70244 -9.85903 16287 5311050016 BOKASAPE TIMUR NUSA TENGGARA TIMUR 146 Phase 2 40 33 960 7.3 121.90038 -8.80396 16288 5303162003 NAITAE NUSA TENGGARA TIMUR 94 Phase 3 21 14 763 3.2 123.69456 -9.84618 16289 5315030006 SURUNUMBENG NUSA TENGGARA TIMUR 232 Phase 2 51 43 299 9.3 120.21816 -8.75917 Annex II – Demand forecast results Page 74 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 16290 5303162003 NAITAE NUSA TENGGARA TIMUR 311 Phase 3 67 47 101 10.2 123.69290 -9.84161 16291 5315030006 SURUNUMBENG NUSA TENGGARA TIMUR 344 Phase 2 75 63 675 13.7 120.21291 -8.76042 16292 5303162005 TUAKAU NUSA TENGGARA TIMUR 710 Phase 3 160 112 480 24.3 123.68813 -9.83313 16293 5319050025 WATU LANUR NUSA TENGGARA TIMUR 285 Phase 2 61 51 789 11.2 120.58594 -8.47397 16294 5303162005 TUAKAU NUSA TENGGARA TIMUR 72 Phase 3 17 11 951 2.6 123.68502 -9.82658 16295 5311061014 RANGALAKA NUSA TENGGARA TIMUR 261 Phase 2 58 49 242 10.6 121.93352 -8.54544 16296 5303162005 TUAKAU NUSA TENGGARA TIMUR 108 Phase 3 25 17 575 3.8 123.68537 -9.82253 16297 5319020015 GOLOMENI NUSA TENGGARA TIMUR 467 Phase 2 104 88 296 19.1 120.69677 -8.65939 16298 5303162005 TUAKAU NUSA TENGGARA TIMUR 444 Phase 3 100 70 300 15.2 123.68359 -9.81385 16299 5313041016 KOLE NUSA TENGGARA TIMUR 160 Phase 2 33 28 017 6.0 120.33160 -8.68080 16300 5303162004 NUATAUS NUSA TENGGARA TIMUR 580 Phase 3 125 87 875 19.0 123.68785 -9.81244 16301 5318010003 WOLOKISA NUSA TENGGARA TIMUR 103 Phase 2 24 20 376 4.4 121.15509 -8.87675 16302 5303162004 NUATAUS NUSA TENGGARA TIMUR 525 Phase 3 113 79 439 17.1 123.69773 -9.81381 16303 5318010003 WOLOKISA NUSA TENGGARA TIMUR 204 Phase 2 46 39 054 8.4 121.15014 -8.87728 16304 5303162004 NUATAUS NUSA TENGGARA TIMUR 292 Phase 3 63 44 289 9.6 123.70679 -9.81334 16305 5315050002 COMPANG NUSA TENGGARA TIMUR 282 Phase 2 59 50 091 10.8 120.17764 -8.53740 16306 5304040012 NULLE NUSA TENGGARA TIMUR 74 Phase 3 21 14 763 3.2 124.32945 -9.86506 16307 5319060003 COMPANG MEKAR NUSA TENGGARA TIMUR 79 Phase 2 21 17 829 3.8 120.58927 -8.46505 16308 5304040012 NULLE NUSA TENGGARA TIMUR 60 Phase 3 17 11 951 2.6 124.33003 -9.86096 16309 5319060004 TENGKU LEDA NUSA TENGGARA TIMUR 149 Phase 2 28 23 772 5.1 120.58417 -8.45691 16310 5304040012 NULLE NUSA TENGGARA TIMUR 66 Phase 3 19 13 357 2.9 124.33010 -9.85680 16311 5319060004 TENGKU LEDA NUSA TENGGARA TIMUR 45 Phase 2 9 7 641 1.6 120.58143 -8.45162 16312 5304040012 NULLE NUSA TENGGARA TIMUR 126 Phase 3 35 24 605 5.3 124.32939 -9.85273 16313 5319060004 TENGKU LEDA NUSA TENGGARA TIMUR 51 Phase 2 10 8 490 1.8 120.57868 -8.45308 16314 5304040012 NULLE NUSA TENGGARA TIMUR 35 Phase 3 10 7 030 1.5 124.32796 -9.84919 16315 5319060004 TENGKU LEDA NUSA TENGGARA TIMUR 639 Phase 2 120 101 880 22.0 120.57318 -8.45433 16316 5304042004 ENONEONTES NUSA TENGGARA TIMUR 221 Phase 3 52 36 556 7.9 124.32729 -9.83763 16317 5319060004 TENGKU LEDA NUSA TENGGARA TIMUR 841 Phase 2 158 134 142 28.9 120.57184 -8.45869 16318 5304042004 ENONEONTES NUSA TENGGARA TIMUR 348 Phase 3 81 56 943 12.3 124.33552 -9.83863 16319 5319060001 TENGKULAWAR NUSA TENGGARA TIMUR 499 Phase 2 169 143 481 31.0 120.56955 -8.46107 16320 5304042004 ENONEONTES NUSA TENGGARA TIMUR 31 Phase 3 8 5 624 1.2 124.33801 -9.84106 16321 5311071009 FATAATU NUSA TENGGARA TIMUR 106 Phase 2 25 21 225 4.6 121.72779 -8.59082 16322 5304042004 ENONEONTES NUSA TENGGARA TIMUR 85 Phase 3 20 14 060 3.0 124.34235 -9.84140 16323 5311071009 FATAATU NUSA TENGGARA TIMUR 101 Phase 2 24 20 376 4.4 121.73345 -8.59320 16324 5304042004 ENONEONTES NUSA TENGGARA TIMUR 26 Phase 3 7 4 921 1.1 124.34212 -9.84472 16325 5311071010 FATAATU TIMUR NUSA TENGGARA TIMUR 300 Phase 2 74 62 826 13.6 121.73785 -8.59182 16326 5304042004 ENONEONTES NUSA TENGGARA TIMUR 30 Phase 3 7 4 921 1.1 124.34210 -9.84512 16327 5311061013 TOU BARAT NUSA TENGGARA TIMUR 491 Phase 2 148 125 652 27.1 121.92596 -8.56290 16328 5304042004 ENONEONTES NUSA TENGGARA TIMUR 94 Phase 3 22 15 466 3.3 124.34809 -9.85034 16329 5311020017 RUKURAMBA NUSA TENGGARA TIMUR 112 Phase 2 35 29 715 6.4 121.59275 -8.77866 16330 5304042004 ENONEONTES NUSA TENGGARA TIMUR 183 Phase 3 43 30 229 6.5 124.35358 -9.84910 16331 5311020018 NAKURAMBA NUSA TENGGARA TIMUR 73 Phase 2 26 22 074 4.8 121.57994 -8.77553 16332 5304042004 ENONEONTES NUSA TENGGARA TIMUR 8 Phase 3 2 1 406 0.3 124.35611 -9.84762 16333 5311020018 NAKURAMBA NUSA TENGGARA TIMUR 115 Phase 2 40 33 960 7.3 121.57923 -8.77367 16334 5304042004 ENONEONTES NUSA TENGGARA TIMUR 22 Phase 3 6 4 218 0.9 124.35645 -9.84820 16335 5311020018 NAKURAMBA NUSA TENGGARA TIMUR 187 Phase 2 65 55 185 11.9 121.57910 -8.76928 16336 5304042004 ENONEONTES NUSA TENGGARA TIMUR 30 Phase 3 7 4 921 1.1 124.35805 -9.84857 16337 5304042004 ENONEONTES NUSA TENGGARA TIMUR 390 Phase 3 91 63 973 13.8 124.36325 -9.84487 16338 5311020018 NAKURAMBA NUSA TENGGARA TIMUR 56 Phase 2 20 16 980 3.7 121.57034 -8.76712 16339 5304040014 NUSA NUSA TENGGARA TIMUR 120 Phase 3 29 20 387 4.4 124.36520 -9.84400 16340 5311010018 JEGHARANGGA NUSA TENGGARA TIMUR 272 Phase 2 69 58 581 12.6 121.55633 -8.76765 16341 5304040014 NUSA NUSA TENGGARA TIMUR 312 Phase 3 76 53 428 11.5 124.36667 -9.84548 16342 5311010018 JEGHARANGGA NUSA TENGGARA TIMUR 521 Phase 2 132 112 068 24.2 121.55163 -8.76598 16343 5304040014 NUSA NUSA TENGGARA TIMUR 302 Phase 3 73 51 319 11.1 124.36912 -9.84749 16344 5319010008 NGAMPANG MAS NUSA TENGGARA TIMUR 303 Phase 2 60 50 940 11.0 120.66717 -8.70757 16345 5304042003 TETAF NUSA TENGGARA TIMUR 406 Phase 3 98 68 894 14.9 124.36554 -9.84281 16346 5319030014 HAJU NGENDONG NUSA TENGGARA TIMUR 95 Phase 2 22 18 678 4.0 120.73081 -8.55023 16347 5304042003 TETAF NUSA TENGGARA TIMUR 207 Phase 3 50 35 150 7.6 124.36794 -9.84009 16348 5319030014 HAJU NGENDONG NUSA TENGGARA TIMUR 217 Phase 2 49 41 601 9.0 120.73151 -8.54233 16349 5303162004 NUATAUS NUSA TENGGARA TIMUR 141 Phase 3 31 21 793 4.7 123.71174 -9.81104 16350 5319030014 HAJU NGENDONG NUSA TENGGARA TIMUR 176 Phase 2 40 33 960 7.3 120.73150 -8.54053 16351 5306072003 FATULOTU NUSA TENGGARA TIMUR 86 Phase 3 20 14 060 3.0 125.05080 -9.06200 16352 5319030015 LENGKO NAMUT NUSA TENGGARA TIMUR 288 Phase 2 70 59 430 12.8 120.72965 -8.52718 16353 5306072003 FATULOTU NUSA TENGGARA TIMUR 19 Phase 3 5 3 515 0.8 125.04738 -9.06522 16354 5319030015 LENGKO NAMUT NUSA TENGGARA TIMUR 139 Phase 2 34 28 866 6.2 120.73102 -8.52455 16355 5306072003 FATULOTU NUSA TENGGARA TIMUR 14 Phase 3 4 2 812 0.6 125.04686 -9.06490 16356 5319030015 LENGKO NAMUT NUSA TENGGARA TIMUR 55 Phase 2 14 11 886 2.6 120.73210 -8.51997 16357 5306072003 FATULOTU NUSA TENGGARA TIMUR 18 Phase 3 5 3 515 0.8 125.04571 -9.06540 16358 5319030015 LENGKO NAMUT NUSA TENGGARA TIMUR 22 Phase 2 6 5 094 1.1 120.73185 -8.51885 16359 5306072003 FATULOTU NUSA TENGGARA TIMUR 28 Phase 3 7 4 921 1.1 125.04248 -9.06544 16360 5319030015 LENGKO NAMUT NUSA TENGGARA TIMUR 125 Phase 2 31 26 319 5.7 120.73515 -8.51849 16361 5306072003 FATULOTU NUSA TENGGARA TIMUR 342 Phase 3 78 54 834 11.8 125.04151 -9.06413 16362 5319030016 SISIR NUSA TENGGARA TIMUR 223 Phase 2 54 45 846 9.9 120.73514 -8.50699 16363 5306041004 ALAS UTARA NUSA TENGGARA TIMUR 89 Phase 3 25 17 575 3.8 125.02028 -9.33940 16364 5319030016 SISIR NUSA TENGGARA TIMUR 307 Phase 2 74 62 826 13.6 120.73953 -8.50353 16365 5304102004 NENOAT NUSA TENGGARA TIMUR 424 Phase 3 115 80 845 17.4 124.71434 -9.90164 16366 5319030016 SISIR NUSA TENGGARA TIMUR 112 Phase 2 27 22 923 4.9 120.74264 -8.50512 16367 5304040008 TUBUHUE NUSA TENGGARA TIMUR 104 Phase 3 24 16 872 3.6 124.25078 -9.89644 16368 5315050001 LOHA NUSA TENGGARA TIMUR 115 Phase 2 27 22 923 4.9 120.15744 -8.52556 16369 5304041006 HANE NUSA TENGGARA TIMUR 553 Phase 3 143 100 529 21.7 124.24082 -9.90500 16370 5315050001 LOHA NUSA TENGGARA TIMUR 486 Phase 2 114 96 786 20.9 120.15302 -8.51514 16371 5304082001 FATUKOPA NUSA TENGGARA TIMUR 111 Phase 3 32 22 496 4.9 124.61570 -9.69183 16372 5315050001 LOHA NUSA TENGGARA TIMUR 116 Phase 2 28 23 772 5.1 120.15703 -8.50374 16373 5304082001 FATUKOPA NUSA TENGGARA TIMUR 56 Phase 3 16 11 248 2.4 124.61266 -9.69225 16374 5315050001 LOHA NUSA TENGGARA TIMUR 343 Phase 2 80 67 920 14.7 120.15908 -8.46829 Annex II – Demand forecast results Page 75 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 16375 5304082001 FATUKOPA NUSA TENGGARA TIMUR 364 Phase 3 103 72 409 15.6 124.60492 -9.69782 16376 5315050001 LOHA NUSA TENGGARA TIMUR 57 Phase 2 14 11 886 2.6 120.15110 -8.46693 16377 5304051003 OEPLIKI NUSA TENGGARA TIMUR 156 Phase 3 43 30 229 6.5 124.33040 -9.98281 16378 5315050004 PACAR NUSA TENGGARA TIMUR 278 Phase 2 50 42 450 9.2 120.13663 -8.46913 16379 5304012003 TUNE NUSA TENGGARA TIMUR 32 Phase 3 9 6 327 1.4 124.28886 -9.64250 16380 5315050013 NANGA KANTOR NUSA TENGGARA TIMUR 411 Phase 2 91 77 259 16.7 120.11521 -8.44555 16381 5304012003 TUNE NUSA TENGGARA TIMUR 109 Phase 3 29 20 387 4.4 124.29053 -9.64191 16382 5315011005 SEPANG NUSA TENGGARA TIMUR 780 Phase 2 185 157 065 33.9 120.08285 -8.45165 16383 5304012003 TUNE NUSA TENGGARA TIMUR 197 Phase 3 53 37 259 8.0 124.29323 -9.64346 16384 5315011005 SEPANG NUSA TENGGARA TIMUR 606 Phase 2 144 122 256 26.4 120.07789 -8.45609 16385 5305010021 FATUTASU NUSA TENGGARA TIMUR 82 Phase 3 19 13 357 2.9 124.38259 -9.57076 16386 5315011005 SEPANG NUSA TENGGARA TIMUR 45 Phase 2 11 9 339 2.0 120.07331 -8.45211 16387 5305010021 FATUTASU NUSA TENGGARA TIMUR 174 Phase 3 40 28 120 6.1 124.38359 -9.57157 16388 5315011006 GOLO SEPANG NUSA TENGGARA TIMUR 2 643 Phase 2 553 469 497 101.3 120.06071 -8.44801 16389 5305010021 FATUTASU NUSA TENGGARA TIMUR 34 Phase 3 8 5 624 1.2 124.37954 -9.58442 16390 5315011005 SEPANG NUSA TENGGARA TIMUR 15 Phase 2 4 3 396 0.7 120.09029 -8.47279 16391 5305010021 FATUTASU NUSA TENGGARA TIMUR 52 Phase 3 12 8 436 1.8 124.37890 -9.58578 16392 5315011005 SEPANG NUSA TENGGARA TIMUR 21 Phase 2 5 4 245 0.9 120.09140 -8.47301 16393 5305010021 FATUTASU NUSA TENGGARA TIMUR 60 Phase 3 14 9 842 2.1 124.38068 -9.59257 16394 5315011003 MBUIT NUSA TENGGARA TIMUR 185 Phase 2 43 36 507 7.9 120.09007 -8.48493 16395 5305010021 FATUTASU NUSA TENGGARA TIMUR 68 Phase 3 16 11 248 2.4 124.39101 -9.59316 16396 5315011003 MBUIT NUSA TENGGARA TIMUR 191 Phase 2 44 37 356 8.1 120.08211 -8.48911 16397 5305010021 FATUTASU NUSA TENGGARA TIMUR 328 Phase 3 75 52 725 11.4 124.39571 -9.58227 16398 5315011003 MBUIT NUSA TENGGARA TIMUR 21 Phase 2 5 4 245 0.9 120.07730 -8.49612 16399 5305010021 FATUTASU NUSA TENGGARA TIMUR 201 Phase 3 46 32 338 7.0 124.39985 -9.57881 16400 5315011003 MBUIT NUSA TENGGARA TIMUR 497 Phase 2 115 97 635 21.1 120.08012 -8.49908 16401 5305011002 AKOMI NUSA TENGGARA TIMUR 742 Phase 3 203 142 709 30.8 124.40234 -9.56437 16402 5315011003 MBUIT NUSA TENGGARA TIMUR 20 Phase 2 5 4 245 0.9 120.08116 -8.49933 16403 5305010007 FATUNISUAN NUSA TENGGARA TIMUR 85 Phase 3 29 20 387 4.4 124.36548 -9.58672 16404 5315011003 MBUIT NUSA TENGGARA TIMUR 37 Phase 2 9 7 641 1.6 120.08235 -8.49861 16405 5304021009 OELNUNUH NUSA TENGGARA TIMUR 158 Phase 3 43 30 229 6.5 124.36533 -9.59700 16406 5315011003 MBUIT NUSA TENGGARA TIMUR 63 Phase 2 15 12 735 2.7 120.08556 -8.49794 16407 5304021009 OELNUNUH NUSA TENGGARA TIMUR 124 Phase 3 34 23 902 5.2 124.36806 -9.59866 16408 5315011003 MBUIT NUSA TENGGARA TIMUR 371 Phase 2 86 73 014 15.8 120.08797 -8.49550 16409 5304021009 OELNUNUH NUSA TENGGARA TIMUR 483 Phase 3 129 90 687 19.6 124.36426 -9.61022 16410 5315011003 MBUIT NUSA TENGGARA TIMUR 170 Phase 2 40 33 960 7.3 120.09056 -8.49776 16411 5305025009 BANAIN C NUSA TENGGARA TIMUR 13 Phase 3 5 3 515 0.8 124.42758 -9.35729 16412 5315011005 SEPANG NUSA TENGGARA TIMUR 209 Phase 2 50 42 450 9.2 120.07524 -8.48380 16413 5305025006 SAINONI NUSA TENGGARA TIMUR 86 Phase 3 24 16 872 3.6 124.43982 -9.36001 16414 5315011005 SEPANG NUSA TENGGARA TIMUR 43 Phase 2 11 9 339 2.0 120.07356 -8.48257 16415 5305025006 SAINONI NUSA TENGGARA TIMUR 28 Phase 3 8 5 624 1.2 124.44278 -9.36048 16416 5315011005 SEPANG NUSA TENGGARA TIMUR 57 Phase 2 14 11 886 2.6 120.06575 -8.49137 16417 5305026001 SUNSEA NUSA TENGGARA TIMUR 231 Phase 3 54 37 962 8.2 124.46411 -9.34110 16418 5315011005 SEPANG NUSA TENGGARA TIMUR 100 Phase 2 24 20 376 4.4 120.05595 -8.49343 16419 5305026001 SUNSEA NUSA TENGGARA TIMUR 147 Phase 3 35 24 605 5.3 124.46762 -9.33704 16420 5315011005 SEPANG NUSA TENGGARA TIMUR 50 Phase 2 12 10 188 2.2 120.05305 -8.49338 16421 5305026001 SUNSEA NUSA TENGGARA TIMUR 59 Phase 3 14 9 842 2.1 124.47062 -9.33283 16422 5315011002 GOLO KETAK NUSA TENGGARA TIMUR 98 Phase 2 23 19 527 4.2 120.04873 -8.50073 16423 5305026001 SUNSEA NUSA TENGGARA TIMUR 104 Phase 3 25 17 575 3.8 124.47415 -9.32995 16424 5315011002 GOLO KETAK NUSA TENGGARA TIMUR 522 Phase 2 120 101 880 22.0 120.04857 -8.51586 16425 5305026001 SUNSEA NUSA TENGGARA TIMUR 25 Phase 3 6 4 218 0.9 124.47715 -9.32882 16426 5315011002 GOLO KETAK NUSA TENGGARA TIMUR 734 Phase 2 169 143 481 31.0 120.05615 -8.52511 16427 5305026001 SUNSEA NUSA TENGGARA TIMUR 15 Phase 3 4 2 812 0.6 124.47791 -9.32794 16428 5315011002 GOLO KETAK NUSA TENGGARA TIMUR 139 Phase 2 32 27 168 5.9 120.04301 -8.49841 16429 5305026001 SUNSEA NUSA TENGGARA TIMUR 11 Phase 3 3 2 109 0.5 124.47932 -9.32564 16430 5315011002 GOLO KETAK NUSA TENGGARA TIMUR 265 Phase 2 61 51 789 11.2 120.04064 -8.49540 16431 5305026001 SUNSEA NUSA TENGGARA TIMUR 56 Phase 3 13 9 139 2.0 124.48020 -9.32607 16432 5315011003 MBUIT NUSA TENGGARA TIMUR 140 Phase 2 33 28 017 6.0 120.06851 -8.50553 16433 5305026001 SUNSEA NUSA TENGGARA TIMUR 37 Phase 3 9 6 327 1.4 124.48108 -9.32499 16434 5315011003 MBUIT NUSA TENGGARA TIMUR 415 Phase 2 96 81 504 17.6 120.06564 -8.51289 16435 5305026002 BAKITOLAS NUSA TENGGARA TIMUR 681 Phase 3 173 121 619 26.2 124.48847 -9.31734 16436 5319010018 TOROK GOLO NUSA TENGGARA TIMUR 70 Phase 2 15 12 735 2.7 120.54705 -8.73552 16437 5305026002 BAKITOLAS NUSA TENGGARA TIMUR 672 Phase 3 171 120 213 25.9 124.48615 -9.31082 16438 5319010002 SATAR LAHING NUSA TENGGARA TIMUR 203 Phase 2 38 32 262 7.0 120.53819 -8.73985 16439 5305026001 SUNSEA NUSA TENGGARA TIMUR 37 Phase 3 9 6 327 1.4 124.48123 -9.33829 16440 5319010002 SATAR LAHING NUSA TENGGARA TIMUR 445 Phase 2 82 69 618 15.0 120.53547 -8.74458 16441 5305026001 SUNSEA NUSA TENGGARA TIMUR 60 Phase 3 14 9 842 2.1 124.48136 -9.34085 16442 5319020005 WATU NGGENE NUSA TENGGARA TIMUR 342 Phase 2 71 60 279 13.0 120.80362 -8.80644 16443 5305020038 BOKON NUSA TENGGARA TIMUR 434 Phase 3 125 87 875 19.0 124.48370 -9.34484 16444 5319020005 WATU NGGENE NUSA TENGGARA TIMUR 256 Phase 2 54 45 846 9.9 120.79962 -8.80393 16445 5305026001 SUNSEA NUSA TENGGARA TIMUR 17 Phase 3 4 2 812 0.6 124.47950 -9.32510 16446 5319020005 WATU NGGENE NUSA TENGGARA TIMUR 144 Phase 2 30 25 470 5.5 120.80782 -8.80443 16447 5304050010 BATNUN NUSA TENGGARA TIMUR 38 Phase 3 10 7 030 1.5 124.24620 -10.05454 16448 5311053002 WOLOARA NUSA TENGGARA TIMUR 49 Phase 2 15 12 735 2.7 121.83980 -8.75803 16449 5304050010 BATNUN NUSA TENGGARA TIMUR 212 Phase 3 55 38 665 8.3 124.24757 -10.04901 16450 5311053002 WOLOARA NUSA TENGGARA TIMUR 137 Phase 2 41 34 809 7.5 121.83813 -8.76002 16451 5304050011 KIUBAAT NUSA TENGGARA TIMUR 110 Phase 3 27 18 981 4.1 124.24872 -10.03611 16452 5311053002 WOLOARA NUSA TENGGARA TIMUR 106 Phase 2 32 27 168 5.9 121.84569 -8.76322 16453 5304050011 KIUBAAT NUSA TENGGARA TIMUR 190 Phase 3 47 33 041 7.1 124.25073 -10.03558 16454 5311053001 PEMO NUSA TENGGARA TIMUR 24 Phase 2 8 6 792 1.5 121.84258 -8.76859 16455 5304050011 KIUBAAT NUSA TENGGARA TIMUR 83 Phase 3 21 14 763 3.2 124.24937 -10.03073 16456 5311053001 PEMO NUSA TENGGARA TIMUR 59 Phase 2 19 16 131 3.5 121.84109 -8.77796 16457 5304050011 KIUBAAT NUSA TENGGARA TIMUR 149 Phase 3 37 26 011 5.6 124.25093 -10.03054 16458 5311053001 PEMO NUSA TENGGARA TIMUR 29 Phase 2 10 8 490 1.8 121.83912 -8.77825 16459 5304050011 KIUBAAT NUSA TENGGARA TIMUR 854 Phase 3 210 147 630 31.9 124.26430 -10.03598 Annex II – Demand forecast results Page 76 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 16460 5311053001 PEMO NUSA TENGGARA TIMUR 155 Phase 2 49 41 601 9.0 121.83623 -8.78173 16461 5303160005 CAMPLONG II NUSA TENGGARA TIMUR 119 Phase 3 34 23 902 5.2 123.96524 -10.01716 16462 5311053001 PEMO NUSA TENGGARA TIMUR 192 Phase 2 61 51 789 11.2 121.83628 -8.78312 16463 5303160005 CAMPLONG II NUSA TENGGARA TIMUR 130 Phase 3 37 26 011 5.6 123.96640 -10.01561 16464 5313140011 SALAMA NUSA TENGGARA TIMUR 140 Phase 2 36 30 564 6.6 120.47898 -8.32983 16465 5305044004 FAFINESU C NUSA TENGGARA TIMUR 353 Phase 3 93 65 379 14.1 124.57658 -9.34327 16466 5313140009 RUIS NUSA TENGGARA TIMUR 352 Phase 2 82 69 618 15.0 120.46957 -8.33089 16467 5305044005 BANUAN NUSA TENGGARA TIMUR 98 Phase 3 23 16 169 3.5 124.57531 -9.34205 16468 5313140009 RUIS NUSA TENGGARA TIMUR 147 Phase 2 34 28 866 6.2 120.45959 -8.33265 16469 5304060005 KUANFATU NUSA TENGGARA TIMUR 125 Phase 3 29 20 387 4.4 124.42932 -10.03252 16470 5313140009 RUIS NUSA TENGGARA TIMUR 687 Phase 2 159 134 991 29.1 120.46583 -8.34636 16471 5304060005 KUANFATU NUSA TENGGARA TIMUR 157 Phase 3 37 26 011 5.6 124.42142 -10.03770 16472 5313140009 RUIS NUSA TENGGARA TIMUR 134 Phase 2 31 26 319 5.7 120.45161 -8.35832 16473 5304060006 KELLE NUSA TENGGARA TIMUR 254 Phase 3 57 40 071 8.6 124.41126 -10.04161 16474 5313140008 BAJAK NUSA TENGGARA TIMUR 459 Phase 2 99 84 051 18.1 120.45363 -8.36770 16475 5304060006 KELLE NUSA TENGGARA TIMUR 237 Phase 3 54 37 962 8.2 124.41029 -10.04487 16476 5313140009 RUIS NUSA TENGGARA TIMUR 60 Phase 2 14 11 886 2.6 120.45011 -8.35839 16477 5304060006 KELLE NUSA TENGGARA TIMUR 204 Phase 3 46 32 338 7.0 124.40996 -10.04648 16478 5313140009 RUIS NUSA TENGGARA TIMUR 176 Phase 2 41 34 809 7.5 120.43337 -8.36509 16479 5305020040 FATUSENE NUSA TENGGARA TIMUR 34 Phase 3 10 7 030 1.5 124.48271 -9.38991 16480 5313140009 RUIS NUSA TENGGARA TIMUR 122 Phase 2 29 24 621 5.3 120.43150 -8.36417 16481 5306080015 LAMAK SENULU NUSA TENGGARA TIMUR 26 Phase 3 8 5 624 1.2 125.15183 -9.03955 16482 5313140007 WATU TANGO NUSA TENGGARA TIMUR 347 Phase 2 78 66 222 14.3 120.43812 -8.38176 16483 5306071004 AITOUN NUSA TENGGARA TIMUR 388 Phase 3 118 82 954 17.9 125.14752 -9.04073 16484 5313140007 WATU TANGO NUSA TENGGARA TIMUR 204 Phase 2 46 39 054 8.4 120.43492 -8.38939 16485 5305025006 SAINONI NUSA TENGGARA TIMUR 187 Phase 3 51 35 853 7.7 124.41819 -9.38527 16486 5313140007 WATU TANGO NUSA TENGGARA TIMUR 204 Phase 2 46 39 054 8.4 120.42584 -8.39286 16487 5305061001 SIFANIHA NUSA TENGGARA TIMUR 136 Phase 3 32 22 496 4.9 124.76926 -9.09784 16488 5313140006 TORONG KOE NUSA TENGGARA TIMUR 146 Phase 2 34 28 866 6.2 120.41786 -8.40215 16489 5305061001 SIFANIHA NUSA TENGGARA TIMUR 34 Phase 3 8 5 624 1.2 124.76837 -9.10321 16490 5313140006 TORONG KOE NUSA TENGGARA TIMUR 25 Phase 2 6 5 094 1.1 120.40269 -8.40489 16491 5305061001 SIFANIHA NUSA TENGGARA TIMUR 651 Phase 3 150 105 450 22.8 124.77197 -9.11778 16492 5313140005 LOCE NUSA TENGGARA TIMUR 312 Phase 2 69 58 581 12.6 120.40139 -8.40494 16493 5304061003 KIUFATU NUSA TENGGARA TIMUR 308 Phase 3 77 54 131 11.7 124.37770 -10.11659 16494 5313140005 LOCE NUSA TENGGARA TIMUR 107 Phase 2 24 20 376 4.4 120.38914 -8.39314 16495 5304020008 KESETNANA NUSA TENGGARA TIMUR 75 Phase 3 18 12 654 2.7 124.23978 -9.86911 16496 5313140005 LOCE NUSA TENGGARA TIMUR 632 Phase 2 139 118 011 25.5 120.38118 -8.38574 16497 5304020008 KESETNANA NUSA TENGGARA TIMUR 27 Phase 3 7 4 921 1.1 124.24188 -9.85993 16498 5313140005 LOCE NUSA TENGGARA TIMUR 141 Phase 2 32 27 168 5.9 120.38148 -8.38351 16499 5304020008 KESETNANA NUSA TENGGARA TIMUR 466 Phase 3 111 78 033 16.8 124.23483 -9.85364 16500 5313140005 LOCE NUSA TENGGARA TIMUR 109 Phase 2 24 20 376 4.4 120.37963 -8.38403 16501 5304020008 KESETNANA NUSA TENGGARA TIMUR 73 Phase 3 18 12 654 2.7 124.23176 -9.85302 16502 5313140005 LOCE NUSA TENGGARA TIMUR 67 Phase 2 15 12 735 2.7 120.37684 -8.38119 16503 5304020005 BILOTO NUSA TENGGARA TIMUR 25 Phase 3 7 4 921 1.1 124.22846 -9.85519 16504 5313140005 LOCE NUSA TENGGARA TIMUR 102 Phase 2 23 19 527 4.2 120.37539 -8.38121 16505 5304020005 BILOTO NUSA TENGGARA TIMUR 6 Phase 3 2 1 406 0.3 124.22660 -9.85820 16506 5313140005 LOCE NUSA TENGGARA TIMUR 130 Phase 2 29 24 621 5.3 120.37444 -8.38155 16507 5304020005 BILOTO NUSA TENGGARA TIMUR 82 Phase 3 21 14 763 3.2 124.22507 -9.85789 16508 5313140005 LOCE NUSA TENGGARA TIMUR 168 Phase 2 37 31 413 6.8 120.37228 -8.39213 16509 5304020005 BILOTO NUSA TENGGARA TIMUR 110 Phase 3 27 18 981 4.1 124.21961 -9.86084 16510 5313140004 SAMBI NUSA TENGGARA TIMUR 142 Phase 2 34 28 866 6.2 120.37069 -8.40579 16511 5304020005 BILOTO NUSA TENGGARA TIMUR 69 Phase 3 17 11 951 2.6 124.22020 -9.86757 16512 5313140004 SAMBI NUSA TENGGARA TIMUR 491 Phase 2 118 100 182 21.6 120.36733 -8.41752 16513 5304020005 BILOTO NUSA TENGGARA TIMUR 65 Phase 3 16 11 248 2.4 124.21961 -9.87080 16514 5315040027 GOLO POLENG NUSA TENGGARA TIMUR 1 157 Phase 2 212 179 988 38.8 120.37124 -8.44245 16515 5304020005 BILOTO NUSA TENGGARA TIMUR 268 Phase 3 66 46 398 10.0 124.22102 -9.87184 16516 5315040027 GOLO POLENG NUSA TENGGARA TIMUR 583 Phase 2 107 90 843 19.6 120.37341 -8.45790 16517 5304020005 BILOTO NUSA TENGGARA TIMUR 239 Phase 3 59 41 477 8.9 124.21934 -9.87623 16518 5315040027 GOLO POLENG NUSA TENGGARA TIMUR 718 Phase 2 132 112 068 24.2 120.37672 -8.46122 16519 5306023007 TUNMAT NUSA TENGGARA TIMUR 134 Phase 3 35 24 605 5.3 124.76458 -9.49131 16520 5313140004 SAMBI NUSA TENGGARA TIMUR 347 Phase 2 83 70 467 15.2 120.35291 -8.38951 16521 5306023007 TUNMAT NUSA TENGGARA TIMUR 655 Phase 3 168 118 104 25.5 124.75714 -9.49708 16522 5313140004 SAMBI NUSA TENGGARA TIMUR 142 Phase 2 34 28 866 6.2 120.34980 -8.38618 16523 5304010016 TUNUA NUSA TENGGARA TIMUR 25 Phase 3 7 4 921 1.1 124.24211 -9.68728 16524 5313140004 SAMBI NUSA TENGGARA TIMUR 38 Phase 2 10 8 490 1.8 120.34798 -8.37918 16525 5304010016 TUNUA NUSA TENGGARA TIMUR 66 Phase 3 18 12 654 2.7 124.23841 -9.68652 16526 5313140004 SAMBI NUSA TENGGARA TIMUR 48 Phase 2 12 10 188 2.2 120.34750 -8.37808 16527 5304010003 LELOBOKO NUSA TENGGARA TIMUR 317 Phase 3 81 56 943 12.3 124.22498 -9.69438 16528 5313140004 SAMBI NUSA TENGGARA TIMUR 92 Phase 2 22 18 678 4.0 120.34887 -8.37781 16529 5304010003 LELOBOKO NUSA TENGGARA TIMUR 54 Phase 3 14 9 842 2.1 124.22288 -9.69611 16530 5313140004 SAMBI NUSA TENGGARA TIMUR 170 Phase 2 41 34 809 7.5 120.34903 -8.37640 16531 5304010017 FATUKOTO NUSA TENGGARA TIMUR 142 Phase 3 32 22 496 4.9 124.22276 -9.69683 16532 5313140004 SAMBI NUSA TENGGARA TIMUR 82 Phase 2 20 16 980 3.7 120.34601 -8.37855 16533 5304010017 FATUKOTO NUSA TENGGARA TIMUR 68 Phase 3 16 11 248 2.4 124.21495 -9.70160 16534 5313140002 WAE KAJONG NUSA TENGGARA TIMUR 111 Phase 2 24 20 376 4.4 120.33942 -8.37357 16535 5304010017 FATUKOTO NUSA TENGGARA TIMUR 297 Phase 3 67 47 101 10.2 124.21456 -9.70496 16536 5313140002 WAE KAJONG NUSA TENGGARA TIMUR 202 Phase 2 44 37 356 8.1 120.33828 -8.37422 16537 5304010017 FATUKOTO NUSA TENGGARA TIMUR 54 Phase 3 13 9 139 2.0 124.21675 -9.70469 16538 5313140002 WAE KAJONG NUSA TENGGARA TIMUR 411 Phase 2 89 75 561 16.3 120.33620 -8.37474 16539 5304010017 FATUKOTO NUSA TENGGARA TIMUR 76 Phase 3 17 11 951 2.6 124.21632 -9.70718 16540 5313140002 WAE KAJONG NUSA TENGGARA TIMUR 947 Phase 2 205 174 045 37.6 120.33556 -8.37632 16541 5304012003 TUNE NUSA TENGGARA TIMUR 510 Phase 3 136 95 608 20.6 124.29990 -9.63735 16542 5313140006 TORONG KOE NUSA TENGGARA TIMUR 137 Phase 2 32 27 168 5.9 120.42435 -8.38269 16543 5306012006 WEOE NUSA TENGGARA TIMUR 49 Phase 3 14 9 842 2.1 124.83306 -9.67582 16544 5313140006 TORONG KOE NUSA TENGGARA TIMUR 410 Phase 2 96 81 504 17.6 120.41034 -8.38531 Annex II – Demand forecast results Page 77 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 16545 5306012012 BIRIS NUSA TENGGARA TIMUR 64 Phase 3 16 11 248 2.4 124.83249 -9.67589 16546 5313140006 TORONG KOE NUSA TENGGARA TIMUR 198 Phase 2 46 39 054 8.4 120.40794 -8.37775 16547 5304110006 FATILO NUSA TENGGARA TIMUR 214 Phase 3 50 35 150 7.6 124.66926 -9.74298 16548 5313140003 LANTE NUSA TENGGARA TIMUR 207 Phase 2 53 44 997 9.7 120.34500 -8.40819 16549 5304110006 FATILO NUSA TENGGARA TIMUR 115 Phase 3 27 18 981 4.1 124.66895 -9.74099 16550 5313140003 LANTE NUSA TENGGARA TIMUR 457 Phase 2 117 99 333 21.4 120.33552 -8.40674 16551 5304070011 MAUNUM NIKI NIKI NUSA TENGGARA TIMUR 45 Phase 3 12 8 436 1.8 124.49546 -9.81333 16552 5319020013 PAAN LELENG NUSA TENGGARA TIMUR 163 Phase 2 36 30 564 6.6 120.70080 -8.69772 16553 5304090014 FALLAS NUSA TENGGARA TIMUR 360 Phase 3 95 66 785 14.4 124.49604 -9.81320 16554 5319020014 MOKEL NUSA TENGGARA TIMUR 120 Phase 2 28 23 772 5.1 120.69874 -8.68857 16555 5305062003 NAKU NUSA TENGGARA TIMUR 270 Phase 3 65 45 695 9.9 124.82728 -9.22717 16556 5319020014 MOKEL NUSA TENGGARA TIMUR 43 Phase 2 10 8 490 1.8 120.70574 -8.68578 16557 5305062003 NAKU NUSA TENGGARA TIMUR 587 Phase 3 140 98 420 21.2 124.81858 -9.22473 16558 5319020014 MOKEL NUSA TENGGARA TIMUR 330 Phase 2 75 63 675 13.7 120.70836 -8.68777 16559 5305062003 NAKU NUSA TENGGARA TIMUR 142 Phase 3 34 23 902 5.2 124.80559 -9.22467 16560 5319020014 MOKEL NUSA TENGGARA TIMUR 131 Phase 2 30 25 470 5.5 120.71700 -8.68444 16561 5305062005 BIRUNATUN NUSA TENGGARA TIMUR 249 Phase 3 61 42 883 9.3 124.79527 -9.20692 16562 5319020014 MOKEL NUSA TENGGARA TIMUR 58 Phase 2 14 11 886 2.6 120.71899 -8.68020 16563 5305062005 BIRUNATUN NUSA TENGGARA TIMUR 475 Phase 3 116 81 548 17.6 124.79422 -9.20337 16564 5319020016 RANA MBELING NUSA TENGGARA TIMUR 385 Phase 2 85 72 165 15.6 120.72365 -8.68046 16565 5305062004 MAKUN NUSA TENGGARA TIMUR 330 Phase 3 77 54 131 11.7 124.78582 -9.23381 16566 5315050009 MBAKUNG NUSA TENGGARA TIMUR 733 Phase 2 188 159 612 34.4 120.20068 -8.34633 16567 5305062004 MAKUN NUSA TENGGARA TIMUR 609 Phase 3 142 99 826 21.5 124.77550 -9.23760 16568 5313121002 BANGKA KENDA NUSA TENGGARA TIMUR 95 Phase 2 21 17 829 3.8 120.45772 -8.56692 16569 5304042003 TETAF NUSA TENGGARA TIMUR 228 Phase 3 55 38 665 8.3 124.40371 -9.83309 16570 5311071008 MAUTENDA NUSA TENGGARA TIMUR 171 Phase 2 37 31 413 6.8 121.70389 -8.57415 16571 5304042003 TETAF NUSA TENGGARA TIMUR 102 Phase 3 25 17 575 3.8 124.40221 -9.82780 16572 5315050002 COMPANG NUSA TENGGARA TIMUR 158 Phase 2 33 28 017 6.0 120.20011 -8.55481 16573 5304042003 TETAF NUSA TENGGARA TIMUR 40 Phase 3 10 7 030 1.5 124.40441 -9.82311 16574 5315050002 COMPANG NUSA TENGGARA TIMUR 85 Phase 2 18 15 282 3.3 120.19932 -8.55686 16575 5304042003 TETAF NUSA TENGGARA TIMUR 264 Phase 3 64 44 992 9.7 124.41008 -9.82606 16576 5315050002 COMPANG NUSA TENGGARA TIMUR 92 Phase 2 19 16 131 3.5 120.19193 -8.56391 16577 5304042003 TETAF NUSA TENGGARA TIMUR 173 Phase 3 42 29 526 6.4 124.40460 -9.81676 16578 5315031010 SEMANG NUSA TENGGARA TIMUR 475 Phase 2 100 84 900 18.3 120.19976 -8.57413 16579 5304042003 TETAF NUSA TENGGARA TIMUR 68 Phase 3 17 11 951 2.6 124.40632 -9.81663 16580 5315031010 SEMANG NUSA TENGGARA TIMUR 202 Phase 2 43 36 507 7.9 120.18510 -8.57161 16581 5304042003 TETAF NUSA TENGGARA TIMUR 215 Phase 3 52 36 556 7.9 124.39774 -9.81803 16582 5315031011 PENGKA NUSA TENGGARA TIMUR 105 Phase 2 26 22 074 4.8 120.18324 -8.57327 16583 5304042003 TETAF NUSA TENGGARA TIMUR 79 Phase 3 19 13 357 2.9 124.39680 -9.82108 16584 5315031011 PENGKA NUSA TENGGARA TIMUR 377 Phase 2 91 77 259 16.7 120.18153 -8.59137 16585 5306023001 FATOIN NUSA TENGGARA TIMUR 69 Phase 3 17 11 951 2.6 124.76600 -9.55156 16586 5315031010 SEMANG NUSA TENGGARA TIMUR 301 Phase 2 63 53 487 11.5 120.18923 -8.59712 16587 5304060009 LASI NUSA TENGGARA TIMUR 202 Phase 3 49 34 447 7.4 124.46652 -9.98722 16588 5315031011 PENGKA NUSA TENGGARA TIMUR 146 Phase 2 36 30 564 6.6 120.17145 -8.59601 16589 5303130013 NONBES NUSA TENGGARA TIMUR 334 Phase 3 72 50 616 10.9 123.82546 -10.20229 16590 5315031007 GOLO RONGGOT NUSA TENGGARA TIMUR 632 Phase 2 113 95 937 20.7 120.15406 -8.59475 16591 5303182001 FATUMONAS NUSA TENGGARA TIMUR 345 Phase 3 80 56 240 12.1 123.98153 -9.66824 16592 5311010006 RAPOWAWO NUSA TENGGARA TIMUR 55 Phase 2 13 11 037 2.4 121.53583 -8.76403 16593 5303182001 FATUMONAS NUSA TENGGARA TIMUR 68 Phase 3 16 11 248 2.4 123.98552 -9.66233 16594 5311010006 RAPOWAWO NUSA TENGGARA TIMUR 253 Phase 2 57 48 393 10.4 121.53355 -8.75998 16595 5303182001 FATUMONAS NUSA TENGGARA TIMUR 511 Phase 3 118 82 954 17.9 123.98831 -9.66122 16596 5311010006 RAPOWAWO NUSA TENGGARA TIMUR 154 Phase 2 35 29 715 6.4 121.53126 -8.76060 16597 5303182001 FATUMONAS NUSA TENGGARA TIMUR 274 Phase 3 64 44 992 9.7 123.99022 -9.66743 16598 5315011003 MBUIT NUSA TENGGARA TIMUR 303 Phase 2 70 59 430 12.8 120.10143 -8.48036 16599 5303182001 FATUMONAS NUSA TENGGARA TIMUR 39 Phase 3 10 7 030 1.5 124.00598 -9.67781 16600 5319020016 RANA MBELING NUSA TENGGARA TIMUR 42 Phase 2 10 8 490 1.8 120.70204 -8.65742 16601 5303182001 FATUMONAS NUSA TENGGARA TIMUR 87 Phase 3 21 14 763 3.2 124.00754 -9.67942 16602 5319020016 RANA MBELING NUSA TENGGARA TIMUR 58 Phase 2 13 11 037 2.4 120.70154 -8.65572 16603 5303182001 FATUMONAS NUSA TENGGARA TIMUR 38 Phase 3 9 6 327 1.4 124.01147 -9.67801 16604 5319020016 RANA MBELING NUSA TENGGARA TIMUR 105 Phase 2 24 20 376 4.4 120.70609 -8.65891 16605 5303182001 FATUMONAS NUSA TENGGARA TIMUR 41 Phase 3 10 7 030 1.5 124.01099 -9.67596 16606 5319020016 RANA MBELING NUSA TENGGARA TIMUR 66 Phase 2 15 12 735 2.7 120.71184 -8.65624 16607 5303182001 FATUMONAS NUSA TENGGARA TIMUR 213 Phase 3 50 35 150 7.6 124.00875 -9.67236 16608 5319020016 RANA MBELING NUSA TENGGARA TIMUR 9 Phase 2 2 1 698 0.4 120.71238 -8.65774 16609 5303182001 FATUMONAS NUSA TENGGARA TIMUR 62 Phase 3 15 10 545 2.3 124.03108 -9.68759 16610 5319020016 RANA MBELING NUSA TENGGARA TIMUR 95 Phase 2 21 17 829 3.8 120.71289 -8.65950 16611 5303182001 FATUMONAS NUSA TENGGARA TIMUR 79 Phase 3 19 13 357 2.9 124.03579 -9.68375 16612 5319020016 RANA MBELING NUSA TENGGARA TIMUR 154 Phase 2 34 28 866 6.2 120.71412 -8.66343 16613 5303182002 BINAFUN NUSA TENGGARA TIMUR 119 Phase 3 24 16 872 3.6 124.03640 -9.66592 16614 5319020017 GOLO NDERU NUSA TENGGARA TIMUR 139 Phase 2 37 31 413 6.8 120.72252 -8.64585 16615 5303182002 BINAFUN NUSA TENGGARA TIMUR 292 Phase 3 59 41 477 8.9 124.03679 -9.66164 16616 5319020017 GOLO NDERU NUSA TENGGARA TIMUR 110 Phase 2 30 25 470 5.5 120.72524 -8.64308 16617 5303182002 BINAFUN NUSA TENGGARA TIMUR 225 Phase 3 45 31 635 6.8 124.03764 -9.66005 16618 5319020017 GOLO NDERU NUSA TENGGARA TIMUR 135 Phase 2 36 30 564 6.6 120.72171 -8.63544 16619 5303182002 BINAFUN NUSA TENGGARA TIMUR 291 Phase 3 58 40 774 8.8 124.03543 -9.65411 16620 5319020017 GOLO NDERU NUSA TENGGARA TIMUR 59 Phase 2 16 13 584 2.9 120.72161 -8.63322 16621 5303182002 BINAFUN NUSA TENGGARA TIMUR 320 Phase 3 64 44 992 9.7 124.03377 -9.65482 16622 5319020017 GOLO NDERU NUSA TENGGARA TIMUR 100 Phase 2 27 22 923 4.9 120.72382 -8.62548 16623 5303182003 BONMUTI NUSA TENGGARA TIMUR 487 Phase 3 127 89 281 19.3 124.03267 -9.63622 16624 5319020017 GOLO NDERU NUSA TENGGARA TIMUR 168 Phase 2 45 38 205 8.2 120.72362 -8.62363 16625 5303182003 BONMUTI NUSA TENGGARA TIMUR 261 Phase 3 68 47 804 10.3 124.03029 -9.63649 16626 5319020017 GOLO NDERU NUSA TENGGARA TIMUR 334 Phase 2 89 75 561 16.3 120.72983 -8.62187 16627 5303182003 BONMUTI NUSA TENGGARA TIMUR 209 Phase 3 55 38 665 8.3 124.02919 -9.63395 16628 5311020020 TONGGOPAPA NUSA TENGGARA TIMUR 32 Phase 2 8 6 792 1.5 121.59292 -8.77795 16629 5304041006 HANE NUSA TENGGARA TIMUR 565 Phase 3 146 102 638 22.1 124.23767 -9.91224 Annex II – Demand forecast results Page 78 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 16630 5311020020 TONGGOPAPA NUSA TENGGARA TIMUR 298 Phase 2 73 61 977 13.4 121.59664 -8.76515 16631 5306031005 NAEKEKUSA NUSA TENGGARA TIMUR 59 Phase 3 16 11 248 2.4 124.88559 -9.43030 16632 5313140001 NGGALAK NUSA TENGGARA TIMUR 591 Phase 2 138 117 162 25.3 120.28647 -8.39179 16633 5303170004 HUEKNUTU NUSA TENGGARA TIMUR 91 Phase 3 23 16 169 3.5 124.01278 -9.87408 16634 5319030014 HAJU NGENDONG NUSA TENGGARA TIMUR 320 Phase 2 72 61 128 13.2 120.74181 -8.54868 16635 5303170004 HUEKNUTU NUSA TENGGARA TIMUR 21 Phase 3 6 4 218 0.9 124.01300 -9.87522 16636 5311020020 TONGGOPAPA NUSA TENGGARA TIMUR 95 Phase 2 24 20 376 4.4 121.59762 -8.76425 16637 5303170004 HUEKNUTU NUSA TENGGARA TIMUR 261 Phase 3 65 45 695 9.9 124.01137 -9.88539 16638 5311020018 NAKURAMBA NUSA TENGGARA TIMUR 228 Phase 2 79 67 071 14.5 121.57533 -8.76011 16639 5303170010 FATUKONA NUSA TENGGARA TIMUR 278 Phase 3 56 39 368 8.5 123.98958 -9.90404 16640 5311020018 NAKURAMBA NUSA TENGGARA TIMUR 74 Phase 2 26 22 074 4.8 121.58074 -8.75726 16641 5303170010 FATUKONA NUSA TENGGARA TIMUR 143 Phase 3 29 20 387 4.4 123.97855 -9.91028 16642 5311020018 NAKURAMBA NUSA TENGGARA TIMUR 161 Phase 2 56 47 544 10.3 121.58513 -8.75721 16643 5303170010 FATUKONA NUSA TENGGARA TIMUR 162 Phase 3 33 23 199 5.0 123.97568 -9.92351 16644 5319030001 GOLO WUAS NUSA TENGGARA TIMUR 96 Phase 2 24 20 376 4.4 120.73835 -8.63234 16645 5303160014 KIUONI NUSA TENGGARA TIMUR 86 Phase 3 21 14 763 3.2 123.97704 -9.92818 16646 5319030001 GOLO WUAS NUSA TENGGARA TIMUR 220 Phase 2 54 45 846 9.9 120.75301 -8.62155 16647 5303160014 KIUONI NUSA TENGGARA TIMUR 99 Phase 3 24 16 872 3.6 123.97158 -9.93807 16648 5319030001 GOLO WUAS NUSA TENGGARA TIMUR 1 023 Phase 2 248 210 552 45.4 120.75258 -8.61904 16649 5303160014 KIUONI NUSA TENGGARA TIMUR 349 Phase 3 84 59 052 12.7 123.97104 -9.94167 16650 5311020016 WOLOKARO NUSA TENGGARA TIMUR 325 Phase 2 90 76 410 16.5 121.60834 -8.76989 16651 5303160014 KIUONI NUSA TENGGARA TIMUR 164 Phase 3 40 28 120 6.1 123.96733 -9.94220 16652 5311020016 WOLOKARO NUSA TENGGARA TIMUR 151 Phase 2 42 35 658 7.7 121.60751 -8.77359 16653 5303160010 EKATETA NUSA TENGGARA TIMUR 722 Phase 3 198 139 194 30.0 123.97205 -9.96030 16654 5319030014 HAJU NGENDONG NUSA TENGGARA TIMUR 39 Phase 2 9 7 641 1.6 120.74818 -8.55162 16655 5303160010 EKATETA NUSA TENGGARA TIMUR 776 Phase 3 213 149 739 32.3 123.95091 -9.97044 16656 5319030015 LENGKO NAMUT NUSA TENGGARA TIMUR 25 Phase 2 7 5 943 1.3 120.74880 -8.55174 16657 5303160010 EKATETA NUSA TENGGARA TIMUR 58 Phase 3 16 11 248 2.4 123.94542 -9.97192 16658 5319030014 HAJU NGENDONG NUSA TENGGARA TIMUR 59 Phase 2 14 11 886 2.6 120.74947 -8.55471 16659 5303160010 EKATETA NUSA TENGGARA TIMUR 210 Phase 3 58 40 774 8.8 123.94337 -9.97632 16660 5319030013 RANA GAPANG NUSA TENGGARA TIMUR 594 Phase 2 142 120 558 26.0 120.76141 -8.55765 16661 5303160010 EKATETA NUSA TENGGARA TIMUR 275 Phase 3 76 53 428 11.5 123.93474 -9.97493 16662 5319020016 RANA MBELING NUSA TENGGARA TIMUR 28 Phase 2 7 5 943 1.3 120.72740 -8.68218 16663 5303160010 EKATETA NUSA TENGGARA TIMUR 214 Phase 3 59 41 477 8.9 123.93831 -9.96480 16664 5319020016 RANA MBELING NUSA TENGGARA TIMUR 70 Phase 2 16 13 584 2.9 120.72892 -8.68050 16665 5303160010 EKATETA NUSA TENGGARA TIMUR 181 Phase 3 50 35 150 7.6 123.92829 -9.96555 16666 5319020016 RANA MBELING NUSA TENGGARA TIMUR 93 Phase 2 21 17 829 3.8 120.73029 -8.68191 16667 5303160010 EKATETA NUSA TENGGARA TIMUR 122 Phase 3 34 23 902 5.2 123.92677 -9.96315 16668 5310061005 KESOKOJA NUSA TENGGARA TIMUR 148 Phase 2 40 33 960 7.3 121.73221 -8.31352 16669 5303160010 EKATETA NUSA TENGGARA TIMUR 71 Phase 3 20 14 060 3.0 123.92697 -9.96798 16670 5311050036 LIKANAKA NUSA TENGGARA TIMUR 178 Phase 2 46 39 054 8.4 121.89919 -8.74843 16671 5303160010 EKATETA NUSA TENGGARA TIMUR 57 Phase 3 16 11 248 2.4 123.91582 -9.97863 16672 5311050036 LIKANAKA NUSA TENGGARA TIMUR 142 Phase 2 37 31 413 6.8 121.89907 -8.75122 16673 5303160010 EKATETA NUSA TENGGARA TIMUR 118 Phase 3 33 23 199 5.0 123.91303 -9.97736 16674 5319020016 RANA MBELING NUSA TENGGARA TIMUR 33 Phase 2 8 6 792 1.5 120.72690 -8.68439 16675 5303160010 EKATETA NUSA TENGGARA TIMUR 53 Phase 3 15 10 545 2.3 123.91045 -9.97608 16676 5319020016 RANA MBELING NUSA TENGGARA TIMUR 78 Phase 2 18 15 282 3.3 120.72489 -8.68629 16677 5303161001 NUNSAEN NUSA TENGGARA TIMUR 23 Phase 3 7 4 921 1.1 123.89712 -9.96302 16678 5319020006 GUNUNG MUTE NUSA TENGGARA TIMUR 50 Phase 2 14 11 886 2.6 120.73838 -8.70096 16679 5303161001 NUNSAEN NUSA TENGGARA TIMUR 453 Phase 3 119 83 657 18.1 123.89446 -9.96382 16680 5319020016 RANA MBELING NUSA TENGGARA TIMUR 135 Phase 2 30 25 470 5.5 120.75399 -8.69164 16681 5303161001 NUNSAEN NUSA TENGGARA TIMUR 113 Phase 3 30 21 090 4.6 123.89091 -9.96733 16682 5319020016 RANA MBELING NUSA TENGGARA TIMUR 308 Phase 2 68 57 732 12.5 120.76344 -8.68259 16683 5303161001 NUNSAEN NUSA TENGGARA TIMUR 609 Phase 3 160 112 480 24.3 123.87354 -9.97648 16684 5319020017 GOLO NDERU NUSA TENGGARA TIMUR 857 Phase 2 228 193 572 41.8 120.76621 -8.66349 16685 5303161001 NUNSAEN NUSA TENGGARA TIMUR 45 Phase 3 12 8 436 1.8 123.87456 -9.97993 16686 5319020006 GUNUNG MUTE NUSA TENGGARA TIMUR 26 Phase 2 7 5 943 1.3 120.73685 -8.70343 16687 5303161001 NUNSAEN NUSA TENGGARA TIMUR 14 Phase 3 4 2 812 0.6 123.87515 -9.98103 16688 5319020006 GUNUNG MUTE NUSA TENGGARA TIMUR 317 Phase 2 85 72 165 15.6 120.74416 -8.71533 16689 5303161001 NUNSAEN NUSA TENGGARA TIMUR 118 Phase 3 31 21 793 4.7 123.87454 -9.98135 16690 5319020006 GUNUNG MUTE NUSA TENGGARA TIMUR 1 169 Phase 2 313 265 737 57.3 120.77121 -8.74135 16691 5303161001 NUNSAEN NUSA TENGGARA TIMUR 4 Phase 3 2 1 406 0.3 123.87504 -9.98193 16692 5318020008 KOTADIRUMALI NUSA TENGGARA TIMUR 161 Phase 2 37 31 413 6.8 121.32876 -8.90591 16693 5303160011 TOLNAKU NUSA TENGGARA TIMUR 743 Phase 3 181 127 243 27.5 123.87573 -9.98834 16694 5318020008 KOTADIRUMALI NUSA TENGGARA TIMUR 104 Phase 2 24 20 376 4.4 121.33596 -8.88527 16695 5303160011 TOLNAKU NUSA TENGGARA TIMUR 461 Phase 3 112 78 736 17.0 123.87457 -9.99023 16696 5318020008 KOTADIRUMALI NUSA TENGGARA TIMUR 201 Phase 2 46 39 054 8.4 121.33439 -8.88354 16697 5303161001 NUNSAEN NUSA TENGGARA TIMUR 78 Phase 3 21 14 763 3.2 123.87044 -9.97773 16698 5318030002 PODENURA NUSA TENGGARA TIMUR 49 Phase 2 13 11 037 2.4 121.35602 -8.87811 16699 5305062004 MAKUN NUSA TENGGARA TIMUR 18 Phase 3 5 3 515 0.8 124.77471 -9.23447 16700 5318030002 PODENURA NUSA TENGGARA TIMUR 107 Phase 2 27 22 923 4.9 121.35373 -8.87356 16701 5305062001 MANUMEAN NUSA TENGGARA TIMUR 493 Phase 3 109 76 627 16.5 124.76892 -9.22778 16702 5318030004 RITI NUSA TENGGARA TIMUR 145 Phase 2 39 33 111 7.1 121.35372 -8.85715 16703 5304021006 BIJELI NUSA TENGGARA TIMUR 48 Phase 3 14 9 842 2.1 124.31589 -9.67599 16704 5318030004 RITI NUSA TENGGARA TIMUR 124 Phase 2 33 28 017 6.0 121.34924 -8.85619 16705 5304012001 TOBU NUSA TENGGARA TIMUR 189 Phase 3 49 34 447 7.4 124.31125 -9.67065 16706 5318030004 RITI NUSA TENGGARA TIMUR 145 Phase 2 39 33 111 7.1 121.34594 -8.85825 16707 5304012001 TOBU NUSA TENGGARA TIMUR 93 Phase 3 24 16 872 3.6 124.31284 -9.66702 16708 5318030004 RITI NUSA TENGGARA TIMUR 59 Phase 2 16 13 584 2.9 121.34302 -8.85794 16709 5303141002 MUKE NUSA TENGGARA TIMUR 209 Phase 3 55 38 665 8.3 124.11443 -10.12006 16710 5318030004 RITI NUSA TENGGARA TIMUR 252 Phase 2 67 56 883 12.3 121.34197 -8.85311 16711 5304010008 EON BESI NUSA TENGGARA TIMUR 173 Phase 3 39 27 417 5.9 124.29010 -9.73531 16712 5318030004 RITI NUSA TENGGARA TIMUR 605 Phase 2 160 135 840 29.3 121.34698 -8.85411 16713 5306013014 WESEY NUSA TENGGARA TIMUR 493 Phase 3 108 75 924 16.4 124.82585 -9.60217 16714 5318030002 PODENURA NUSA TENGGARA TIMUR 122 Phase 2 30 25 470 5.5 121.36205 -8.87991 Annex II – Demand forecast results Page 79 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 16715 5304010008 EON BESI NUSA TENGGARA TIMUR 28 Phase 3 7 4 921 1.1 124.28750 -9.73555 16716 5318030002 PODENURA NUSA TENGGARA TIMUR 295 Phase 2 73 61 977 13.4 121.36422 -8.88074 16717 5304010008 EON BESI NUSA TENGGARA TIMUR 110 Phase 3 25 17 575 3.8 124.28425 -9.73588 16718 5315020024 CUNCA WULANG NUSA TENGGARA TIMUR 124 Phase 2 31 26 319 5.7 119.96585 -8.57236 16719 5304010008 EON BESI NUSA TENGGARA TIMUR 106 Phase 3 24 16 872 3.6 124.28834 -9.74284 16720 5315020018 TONDONG BELANG NUSA TENGGARA TIMUR 396 Phase 2 96 81 504 17.6 119.98525 -8.58217 16721 5304010008 EON BESI NUSA TENGGARA TIMUR 33 Phase 3 8 5 624 1.2 124.28508 -9.74575 16722 5315020018 TONDONG BELANG NUSA TENGGARA TIMUR 494 Phase 2 120 101 880 22.0 119.97496 -8.59213 16723 5304010008 EON BESI NUSA TENGGARA TIMUR 18 Phase 3 5 3 515 0.8 124.28853 -9.74899 16724 5315020017 LIANG NDARA NUSA TENGGARA TIMUR 300 Phase 2 77 65 373 14.1 119.96280 -8.60024 16725 5304010008 EON BESI NUSA TENGGARA TIMUR 132 Phase 3 30 21 090 4.6 124.28971 -9.74908 16726 5315020017 LIANG NDARA NUSA TENGGARA TIMUR 289 Phase 2 74 62 826 13.6 119.96135 -8.59777 16727 5304010008 EON BESI NUSA TENGGARA TIMUR 33 Phase 3 8 5 624 1.2 124.29119 -9.75094 16728 5318030004 RITI NUSA TENGGARA TIMUR 55 Phase 2 15 12 735 2.7 121.35078 -8.84702 16729 5304023003 KUALEU NUSA TENGGARA TIMUR 327 Phase 3 75 52 725 11.4 124.29366 -9.75370 16730 5318030003 TONGGO NUSA TENGGARA TIMUR 144 Phase 2 42 35 658 7.7 121.35999 -8.84381 16731 5304023003 KUALEU NUSA TENGGARA TIMUR 337 Phase 3 77 54 131 11.7 124.29647 -9.74835 16732 5318030003 TONGGO NUSA TENGGARA TIMUR 16 Phase 2 5 4 245 0.9 121.36200 -8.84268 16733 5304061006 TUAPAKAS NUSA TENGGARA TIMUR 67 Phase 3 17 11 951 2.6 124.48034 -10.07996 16734 5318030003 TONGGO NUSA TENGGARA TIMUR 134 Phase 2 39 33 111 7.1 121.36839 -8.83979 16735 5304061006 TUAPAKAS NUSA TENGGARA TIMUR 289 Phase 3 70 49 210 10.6 124.48533 -10.07905 16736 5318030003 TONGGO NUSA TENGGARA TIMUR 83 Phase 2 25 21 225 4.6 121.36979 -8.84321 16737 5304021008 FATUMNUTU NUSA TENGGARA TIMUR 259 Phase 3 61 42 883 9.3 124.34260 -9.58994 16738 5318030003 TONGGO NUSA TENGGARA TIMUR 130 Phase 2 38 32 262 7.0 121.37004 -8.84588 16739 5304060009 LASI NUSA TENGGARA TIMUR 48 Phase 3 12 8 436 1.8 124.42899 -9.97712 16740 5318030003 TONGGO NUSA TENGGARA TIMUR 93 Phase 2 27 22 923 4.9 121.36909 -8.84820 16741 5304060009 LASI NUSA TENGGARA TIMUR 275 Phase 3 67 47 101 10.2 124.42584 -9.97757 16742 5318030007 WOKODEKORORO NUSA TENGGARA TIMUR 385 Phase 3 80 67 920 14.7 121.34775 -8.83451 16743 5304060009 LASI NUSA TENGGARA TIMUR 164 Phase 3 40 28 120 6.1 124.42174 -9.97958 16744 5311010006 RAPOWAWO NUSA TENGGARA TIMUR 65 Phase 3 15 12 735 2.7 121.53754 -8.75238 16745 5303161001 NUNSAEN NUSA TENGGARA TIMUR 246 Phase 3 65 45 695 9.9 123.87004 -9.96997 16746 5311010006 RAPOWAWO NUSA TENGGARA TIMUR 94 Phase 3 22 18 678 4.0 121.52858 -8.74303 16747 5304042003 TETAF NUSA TENGGARA TIMUR 41 Phase 3 10 7 030 1.5 124.36909 -9.83726 16748 5311010008 KERIREA NUSA TENGGARA TIMUR 152 Phase 3 37 31 413 6.8 121.51581 -8.74274 16749 5304042003 TETAF NUSA TENGGARA TIMUR 127 Phase 3 31 21 793 4.7 124.37317 -9.83688 16750 5311010008 KERIREA NUSA TENGGARA TIMUR 104 Phase 3 26 22 074 4.8 121.49305 -8.73764 16751 5304020008 KESETNANA NUSA TENGGARA TIMUR 98 Phase 3 24 16 872 3.6 124.24352 -9.85901 16752 5311010008 KERIREA NUSA TENGGARA TIMUR 258 Phase 3 63 53 487 11.5 121.48951 -8.72992 16753 5306050002 NAITIMU NUSA TENGGARA TIMUR 132 Phase 3 25 17 575 3.8 124.89065 -9.27288 16754 5311010008 KERIREA NUSA TENGGARA TIMUR 174 Phase 3 43 36 507 7.9 121.48653 -8.73796 16755 5306050002 NAITIMU NUSA TENGGARA TIMUR 113 Phase 3 22 15 466 3.3 124.89598 -9.27109 16756 5311010008 KERIREA NUSA TENGGARA TIMUR 64 Phase 3 16 13 584 2.9 121.48294 -8.73628 16757 5306050002 NAITIMU NUSA TENGGARA TIMUR 128 Phase 3 24 16 872 3.6 124.89660 -9.27310 16758 5311010008 KERIREA NUSA TENGGARA TIMUR 34 Phase 3 9 7 641 1.6 121.47291 -8.74351 16759 5306050002 NAITIMU NUSA TENGGARA TIMUR 260 Phase 3 49 34 447 7.4 124.90730 -9.26807 16760 5311010013 TIWE REA NUSA TENGGARA TIMUR 46 Phase 3 9 7 641 1.6 121.47267 -8.74338 16761 5306050010 BAKUSTULAMA NUSA TENGGARA TIMUR 58 Phase 3 13 9 139 2.0 124.91168 -9.26391 16762 5311010014 NDORUREA I NUSA TENGGARA TIMUR 26 Phase 3 7 5 943 1.3 121.47245 -8.74369 16763 5306050010 BAKUSTULAMA NUSA TENGGARA TIMUR 657 Phase 3 145 101 935 22.0 124.91556 -9.26031 16764 5311010013 TIWE REA NUSA TENGGARA TIMUR 451 Phase 3 87 73 863 15.9 121.45565 -8.75379 16765 5306011007 BOEN NUSA TENGGARA TIMUR 92 Phase 3 25 17 575 3.8 124.68966 -9.62076 16766 5311010013 TIWE REA NUSA TENGGARA TIMUR 289 Phase 3 56 47 544 10.3 121.45153 -8.74641 16767 5306011007 BOEN NUSA TENGGARA TIMUR 366 Phase 3 99 69 597 15.0 124.68398 -9.61864 16768 5311010009 TENDAREA NUSA TENGGARA TIMUR 248 Phase 3 63 53 487 11.5 121.44397 -8.73984 16769 5306070018 TIALAI NUSA TENGGARA TIMUR 150 Phase 3 36 25 308 5.5 124.90572 -9.17034 16770 5311010009 TENDAREA NUSA TENGGARA TIMUR 305 Phase 3 77 65 373 14.1 121.44110 -8.73040 16771 5306070018 TIALAI NUSA TENGGARA TIMUR 47 Phase 3 12 8 436 1.8 124.90609 -9.16794 16772 5311010009 TENDAREA NUSA TENGGARA TIMUR 86 Phase 3 22 18 678 4.0 121.43783 -8.73130 16773 5306070001 FATUBA'A NUSA TENGGARA TIMUR 260 Phase 3 70 49 210 10.6 124.90794 -9.16344 16774 5311010009 TENDAREA NUSA TENGGARA TIMUR 139 Phase 3 35 29 715 6.4 121.43603 -8.73246 16775 5306070018 TIALAI NUSA TENGGARA TIMUR 58 Phase 3 14 9 842 2.1 124.90955 -9.16389 16776 5311010009 TENDAREA NUSA TENGGARA TIMUR 124 Phase 3 32 27 168 5.9 121.43623 -8.72708 16777 5306070018 TIALAI NUSA TENGGARA TIMUR 24 Phase 3 6 4 218 0.9 124.91170 -9.16409 16778 5311010011 TENDAMBEPA NUSA TENGGARA TIMUR 434 Phase 3 46 39 054 8.4 121.44025 -8.71210 16779 5306070001 FATUBA'A NUSA TENGGARA TIMUR 47 Phase 3 13 9 139 2.0 124.91241 -9.16416 16780 5311010011 TENDAMBEPA NUSA TENGGARA TIMUR 451 Phase 3 47 39 903 8.6 121.43881 -8.71130 16781 5304080009 TELUK NUSA TENGGARA TIMUR 10 Phase 3 3 2 109 0.5 124.63946 -9.71015 16782 5311010011 TENDAMBEPA NUSA TENGGARA TIMUR 291 Phase 3 31 26 319 5.7 121.43343 -8.70082 16783 5304080010 NIFUKIU NUSA TENGGARA TIMUR 166 Phase 3 45 31 635 6.8 124.63900 -9.70840 16784 5311010011 TENDAMBEPA NUSA TENGGARA TIMUR 661 Phase 3 69 58 581 12.6 121.42993 -8.69543 16785 5304080010 NIFUKIU NUSA TENGGARA TIMUR 259 Phase 3 70 49 210 10.6 124.64426 -9.70899 16786 5311010011 TENDAMBEPA NUSA TENGGARA TIMUR 1 551 Phase 3 161 136 689 29.5 121.43231 -8.69201 16787 5306020016 RAILOR TAHAK NUSA TENGGARA TIMUR 176 Phase 3 50 35 150 7.6 124.95950 -9.59947 16788 5311010009 TENDAREA NUSA TENGGARA TIMUR 140 Phase 3 36 30 564 6.6 121.42922 -8.72500 16789 5306020016 RAILOR TAHAK NUSA TENGGARA TIMUR 50 Phase 3 14 9 842 2.1 124.95842 -9.59856 16790 5311010009 TENDAREA NUSA TENGGARA TIMUR 54 Phase 3 14 11 886 2.6 121.41636 -8.72365 16791 5306020016 RAILOR TAHAK NUSA TENGGARA TIMUR 35 Phase 3 10 7 030 1.5 124.95854 -9.59567 16792 5311010010 WATUMITE NUSA TENGGARA TIMUR 657 Phase 3 172 146 028 31.5 121.41030 -8.71792 16793 5306020016 RAILOR TAHAK NUSA TENGGARA TIMUR 22 Phase 3 7 4 921 1.1 124.95784 -9.59244 16794 5315030006 SURUNUMBENG NUSA TENGGARA TIMUR 142 Phase 3 31 26 319 5.7 120.20627 -8.76731 16795 5306020016 RAILOR TAHAK NUSA TENGGARA TIMUR 62 Phase 3 18 12 654 2.7 124.95931 -9.59088 16796 5315030006 SURUNUMBENG NUSA TENGGARA TIMUR 237 Phase 3 52 44 148 9.5 120.20435 -8.76811 16797 5306020016 RAILOR TAHAK NUSA TENGGARA TIMUR 30 Phase 3 9 6 327 1.4 124.96158 -9.58937 16798 5315030006 SURUNUMBENG NUSA TENGGARA TIMUR 139 Phase 3 31 26 319 5.7 120.20402 -8.76710 16799 5306020016 RAILOR TAHAK NUSA TENGGARA TIMUR 93 Phase 3 27 18 981 4.1 124.96196 -9.59190 Annex II – Demand forecast results Page 80 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 16800 5315030005 WATU WAJA NUSA TENGGARA TIMUR 696 Phase 3 166 140 934 30.4 120.21239 -8.78803 16801 5304080010 NIFUKIU NUSA TENGGARA TIMUR 45 Phase 3 13 9 139 2.0 124.62750 -9.69545 16802 5311020016 WOLOKARO NUSA TENGGARA TIMUR 137 Phase 3 38 32 262 7.0 121.60995 -8.76162 16803 5304080008 MNELAANEN NUSA TENGGARA TIMUR 205 Phase 3 53 37 259 8.0 124.62740 -9.69786 16804 5311020016 WOLOKARO NUSA TENGGARA TIMUR 129 Phase 3 36 30 564 6.6 121.61478 -8.75647 16805 5303100007 UITAO NUSA TENGGARA TIMUR 22 Phase 3 6 4 218 0.9 123.41752 -10.18445 16806 5311020016 WOLOKARO NUSA TENGGARA TIMUR 154 Phase 3 43 36 507 7.9 121.61272 -8.75371 16807 5303100007 UITAO NUSA TENGGARA TIMUR 73 Phase 3 20 14 060 3.0 123.41514 -10.18509 16808 5310011006 LIAKUTU NUSA TENGGARA TIMUR 127 Phase 3 32 27 168 5.9 122.03765 -8.65692 16809 5303100007 UITAO NUSA TENGGARA TIMUR 223 Phase 3 59 41 477 8.9 123.40698 -10.19108 16810 5310011006 LIAKUTU NUSA TENGGARA TIMUR 89 Phase 3 22 18 678 4.0 122.04078 -8.65848 16811 5303100007 UITAO NUSA TENGGARA TIMUR 256 Phase 3 68 47 804 10.3 123.40693 -10.20015 16812 5310011006 LIAKUTU NUSA TENGGARA TIMUR 263 Phase 3 65 55 185 11.9 122.04339 -8.65418 16813 5303100005 BOKONUSAN NUSA TENGGARA TIMUR 81 Phase 3 25 17 575 3.8 123.38963 -10.21181 16814 5310011005 GERA NUSA TENGGARA TIMUR 251 Phase 3 66 56 034 12.1 122.05224 -8.65008 16815 5303100005 BOKONUSAN NUSA TENGGARA TIMUR 706 Phase 3 214 150 442 32.5 123.38381 -10.21159 16816 5315031004 ORONG NUSA TENGGARA TIMUR 235 Phase 3 48 40 752 8.8 120.23908 -8.63148 16817 5303100005 BOKONUSAN NUSA TENGGARA TIMUR 99 Phase 3 30 21 090 4.6 123.38043 -10.21475 16818 5311071010 FATAATU TIMUR NUSA TENGGARA TIMUR 26 Phase 3 7 5 943 1.3 121.74139 -8.58267 16819 5303100005 BOKONUSAN NUSA TENGGARA TIMUR 92 Phase 3 28 19 684 4.2 123.37848 -10.21438 16820 5311071010 FATAATU TIMUR NUSA TENGGARA TIMUR 105 Phase 3 26 22 074 4.8 121.74201 -8.58203 16821 5303101004 ONANSILA NUSA TENGGARA TIMUR 70 Phase 3 18 12 654 2.7 123.39338 -10.24048 16822 5311071010 FATAATU TIMUR NUSA TENGGARA TIMUR 96 Phase 3 24 20 376 4.4 121.74334 -8.58283 16823 5303101004 ONANSILA NUSA TENGGARA TIMUR 331 Phase 3 85 59 755 12.9 123.39667 -10.24508 16824 5311071010 FATAATU TIMUR NUSA TENGGARA TIMUR 143 Phase 3 35 29 715 6.4 121.73642 -8.58060 16825 5303101003 UITIUH ANA NUSA TENGGARA TIMUR 1 466 Phase 3 371 260 813 56.3 123.38804 -10.27191 16826 5311020016 WOLOKARO NUSA TENGGARA TIMUR 85 Phase 3 24 20 376 4.4 121.62735 -8.76318 16827 5303101002 AKLE NUSA TENGGARA TIMUR 826 Phase 3 204 143 412 30.9 123.38335 -10.31036 16828 5311020011 MBOTUTENDA NUSA TENGGARA TIMUR 195 Phase 3 44 37 356 8.1 121.63141 -8.75342 16829 5305026003 BENUS NUSA TENGGARA TIMUR 161 Phase 3 35 24 605 5.3 124.50679 -9.26786 16830 5311020011 MBOTUTENDA NUSA TENGGARA TIMUR 252 Phase 3 56 47 544 10.3 121.63355 -8.74732 16831 5304023003 KUALEU NUSA TENGGARA TIMUR 38 Phase 3 9 6 327 1.4 124.29843 -9.74513 16832 5311020012 JAMOKEASA NUSA TENGGARA TIMUR 633 Phase 3 140 118 860 25.6 121.64144 -8.73902 16833 5304023003 KUALEU NUSA TENGGARA TIMUR 34 Phase 3 8 5 624 1.2 124.30255 -9.74712 16834 5318010012 ULULOGA NUSA TENGGARA TIMUR 167 Phase 3 50 42 450 9.2 121.19338 -8.83952 16835 5304023003 KUALEU NUSA TENGGARA TIMUR 229 Phase 3 52 36 556 7.9 124.30406 -9.74582 16836 5311010010 WATUMITE NUSA TENGGARA TIMUR 293 Phase 3 77 65 373 14.1 121.40750 -8.70405 16837 5304023003 KUALEU NUSA TENGGARA TIMUR 28 Phase 3 7 4 921 1.1 124.31087 -9.74029 16838 5313122003 BANGKA LELAK NUSA TENGGARA TIMUR 436 Phase 3 104 88 296 19.1 120.32665 -8.59833 16839 5304023003 KUALEU NUSA TENGGARA TIMUR 441 Phase 3 100 70 300 15.2 124.31626 -9.73438 16840 5313040020 MOCOK NUSA TENGGARA TIMUR 198 Phase 3 34 28 866 6.2 120.46531 -8.72975 16841 5304023003 KUALEU NUSA TENGGARA TIMUR 83 Phase 3 19 13 357 2.9 124.32116 -9.73060 16842 5311060016 RANOKOLO SELATAN NUSA TENGGARA TIMUR 157 Phase 3 34 28 866 6.2 121.73953 -8.57349 16843 5304021001 LAOB NUSA TENGGARA TIMUR 25 Phase 3 7 4 921 1.1 124.32196 -9.72447 16844 5311060016 RANOKOLO SELATAN NUSA TENGGARA TIMUR 172 Phase 3 38 32 262 7.0 121.73486 -8.56989 16845 5304021001 LAOB NUSA TENGGARA TIMUR 27 Phase 3 8 5 624 1.2 124.32172 -9.72013 16846 5311060016 RANOKOLO SELATAN NUSA TENGGARA TIMUR 176 Phase 3 39 33 111 7.1 121.73278 -8.56842 16847 5304021001 LAOB NUSA TENGGARA TIMUR 72 Phase 3 20 14 060 3.0 124.32387 -9.71927 16848 5319020014 MOKEL NUSA TENGGARA TIMUR 255 Phase 3 58 49 242 10.6 120.69308 -8.67139 16849 5304021001 LAOB NUSA TENGGARA TIMUR 126 Phase 3 35 24 605 5.3 124.32980 -9.72054 16850 5318030014 BIDOA NUSA TENGGARA TIMUR 196 Phase 3 47 39 903 8.6 121.34778 -8.73497 16851 5304023003 KUALEU NUSA TENGGARA TIMUR 106 Phase 3 24 16 872 3.6 124.33691 -9.72532 16852 5313041004 SATAR LENDA NUSA TENGGARA TIMUR 161 Phase 3 35 29 715 6.4 120.30983 -8.84057 16853 5304072003 NOE NONI NUSA TENGGARA TIMUR 71 Phase 3 19 13 357 2.9 124.35390 -9.72891 16854 5311020012 JAMOKEASA NUSA TENGGARA TIMUR 282 Phase 3 63 53 487 11.5 121.63907 -8.73366 16855 5304072003 NOE NONI NUSA TENGGARA TIMUR 85 Phase 3 23 16 169 3.5 124.36028 -9.73031 16856 5311020011 MBOTUTENDA NUSA TENGGARA TIMUR 614 Phase 3 137 116 313 25.1 121.63275 -8.73344 16857 5304072003 NOE NONI NUSA TENGGARA TIMUR 510 Phase 3 136 95 608 20.6 124.37208 -9.72902 16858 5313040012 LANGGO NUSA TENGGARA TIMUR 207 Phase 3 42 35 658 7.7 120.46221 -8.76699 16859 5304072003 NOE NONI NUSA TENGGARA TIMUR 18 Phase 3 5 3 515 0.8 124.37469 -9.73131 16860 5313040012 LANGGO NUSA TENGGARA TIMUR 146 Phase 3 30 25 470 5.5 120.46437 -8.76225 16861 5304072003 NOE NONI NUSA TENGGARA TIMUR 270 Phase 3 72 50 616 10.9 124.37644 -9.73386 16862 5319030013 RANA GAPANG NUSA TENGGARA TIMUR 166 Phase 3 40 33 960 7.3 120.76712 -8.55150 16863 5304072003 NOE NONI NUSA TENGGARA TIMUR 118 Phase 3 32 22 496 4.9 124.37976 -9.73265 16864 5319030012 TIWU KONDO NUSA TENGGARA TIMUR 108 Phase 3 26 22 074 4.8 120.76982 -8.54220 16865 5304072003 NOE NONI NUSA TENGGARA TIMUR 143 Phase 3 39 27 417 5.9 124.38144 -9.73734 16866 5319030012 TIWU KONDO NUSA TENGGARA TIMUR 19 Phase 3 5 4 245 0.9 120.77553 -8.54094 16867 5304072003 NOE NONI NUSA TENGGARA TIMUR 55 Phase 3 15 10 545 2.3 124.35894 -9.73862 16868 5319030012 TIWU KONDO NUSA TENGGARA TIMUR 52 Phase 3 13 11 037 2.4 120.77638 -8.54064 16869 5304072003 NOE NONI NUSA TENGGARA TIMUR 30 Phase 3 8 5 624 1.2 124.35860 -9.74107 16870 5319030013 RANA GAPANG NUSA TENGGARA TIMUR 757 Phase 3 181 153 669 33.2 120.77991 -8.54914 16871 5304072003 NOE NONI NUSA TENGGARA TIMUR 243 Phase 3 65 45 695 9.9 124.35970 -9.74446 16872 5313041008 HILIHINTIR NUSA TENGGARA TIMUR 227 Phase 3 46 39 054 8.4 120.36853 -8.76807 16873 5304072003 NOE NONI NUSA TENGGARA TIMUR 100 Phase 3 27 18 981 4.1 124.37247 -9.75140 16874 5311060020 MAUROLE NUSA TENGGARA TIMUR 129 Phase 3 26 22 074 4.8 121.80325 -8.52565 16875 5304072003 NOE NONI NUSA TENGGARA TIMUR 16 Phase 3 5 3 515 0.8 124.38392 -9.75760 16876 5311060020 MAUROLE NUSA TENGGARA TIMUR 394 Phase 3 78 66 222 14.3 121.80485 -8.53009 16877 5304072003 NOE NONI NUSA TENGGARA TIMUR 34 Phase 3 10 7 030 1.5 124.38580 -9.75937 16878 5311060019 MAUSAMBI NUSA TENGGARA TIMUR 237 Phase 3 49 41 601 9.0 121.79892 -8.53215 16879 5304072003 NOE NONI NUSA TENGGARA TIMUR 27 Phase 3 8 5 624 1.2 124.38520 -9.76213 16880 5311052008 FATAMARI NUSA TENGGARA TIMUR 71 Phase 3 18 15 282 3.3 121.94343 -8.75669 16881 5304042005 NAUKAE NUSA TENGGARA TIMUR 190 Phase 3 51 35 853 7.7 124.38246 -9.77383 16882 5311052008 FATAMARI NUSA TENGGARA TIMUR 77 Phase 3 20 16 980 3.7 121.93754 -8.75386 16883 5304042005 NAUKAE NUSA TENGGARA TIMUR 316 Phase 3 85 59 755 12.9 124.38657 -9.77503 16884 5311052008 FATAMARI NUSA TENGGARA TIMUR 38 Phase 3 10 8 490 1.8 121.94138 -8.75033 Annex II – Demand forecast results Page 81 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 16885 5304042005 NAUKAE NUSA TENGGARA TIMUR 272 Phase 3 73 51 319 11.1 124.40073 -9.77175 16886 5311052008 FATAMARI NUSA TENGGARA TIMUR 205 Phase 3 52 44 148 9.5 121.94138 -8.74895 16887 5304072002 PENE UTARA NUSA TENGGARA TIMUR 691 Phase 3 176 123 728 26.7 124.40913 -9.76265 16888 5318030007 WOKODEKORORO NUSA TENGGARA TIMUR 235 Phase 3 49 41 601 9.0 121.33986 -8.83043 16889 5304072002 PENE UTARA NUSA TENGGARA TIMUR 157 Phase 3 40 28 120 6.1 124.41095 -9.75801 16890 5319030009 TENO MESE NUSA TENGGARA TIMUR 97 Phase 3 19 16 131 3.5 120.76245 -8.63441 16891 5304072002 PENE UTARA NUSA TENGGARA TIMUR 679 Phase 3 173 121 619 26.2 124.40968 -9.75219 16892 5319030002 SIPI NUSA TENGGARA TIMUR 211 Phase 3 47 39 903 8.6 120.75711 -8.64546 16893 5304072002 PENE UTARA NUSA TENGGARA TIMUR 17 Phase 3 5 3 515 0.8 124.40974 -9.74990 16894 5319030002 SIPI NUSA TENGGARA TIMUR 816 Phase 3 181 153 669 33.2 120.75605 -8.64603 16895 5304072002 PENE UTARA NUSA TENGGARA TIMUR 171 Phase 3 44 30 932 6.7 124.40138 -9.74233 16896 5319050016 GURUNG TURI NUSA TENGGARA TIMUR 226 Phase 3 52 44 148 9.5 120.55357 -8.57698 16897 5304072002 PENE UTARA NUSA TENGGARA TIMUR 488 Phase 3 124 87 172 18.8 124.39511 -9.74251 16898 5313041004 SATAR LENDA NUSA TENGGARA TIMUR 207 Phase 3 44 37 356 8.1 120.30643 -8.84887 16899 5306031005 NAEKEKUSA NUSA TENGGARA TIMUR 119 Phase 3 32 22 496 4.9 124.87978 -9.43025 16900 5313041002 SATAR RUWUK NUSA TENGGARA TIMUR 264 Phase 3 58 49 242 10.6 120.28935 -8.84012 16901 5304102009 HAUMENI NUSA TENGGARA TIMUR 18 Phase 3 5 3 515 0.8 124.66261 -9.88534 16902 5313041002 SATAR RUWUK NUSA TENGGARA TIMUR 49 Phase 3 11 9 339 2.0 120.28208 -8.83554 16903 5304102009 HAUMENI NUSA TENGGARA TIMUR 102 Phase 3 28 19 684 4.2 124.66388 -9.88540 16904 5313041002 SATAR RUWUK NUSA TENGGARA TIMUR 447 Phase 3 98 83 202 18.0 120.27957 -8.83051 16905 5304090015 PILI NUSA TENGGARA TIMUR 89 Phase 3 23 16 169 3.5 124.52429 -9.77255 16906 5313041002 SATAR RUWUK NUSA TENGGARA TIMUR 189 Phase 3 42 35 658 7.7 120.27330 -8.83459 16907 5306050010 BAKUSTULAMA NUSA TENGGARA TIMUR 55 Phase 3 13 9 139 2.0 124.93256 -9.25716 16908 5313041001 BORIK NUSA TENGGARA TIMUR 294 Phase 3 74 62 826 13.6 120.25042 -8.84375 16909 5306052002 NANAET NUSA TENGGARA TIMUR 87 Phase 3 21 14 763 3.2 124.93288 -9.26039 16910 5313041001 BORIK NUSA TENGGARA TIMUR 697 Phase 3 174 147 726 31.9 120.24944 -8.84340 16911 5306052002 NANAET NUSA TENGGARA TIMUR 330 Phase 3 78 54 834 11.8 124.93252 -9.26431 16912 5311012006 NABE NUSA TENGGARA TIMUR 145 Phase 3 38 32 262 7.0 121.57520 -8.58127 16913 5306052002 NANAET NUSA TENGGARA TIMUR 85 Phase 3 21 14 763 3.2 124.93982 -9.25823 16914 5315020023 TIWU RIWUNG NUSA TENGGARA TIMUR 216 Phase 3 53 44 997 9.7 120.04195 -8.56497 16915 5306052003 FOHOEKA NUSA TENGGARA TIMUR 125 Phase 3 30 21 090 4.6 124.94041 -9.25820 16916 5315020013 WATU WANGKA NUSA TENGGARA TIMUR 165 Phase 3 39 33 111 7.1 120.07173 -8.60618 16917 5306052002 NANAET NUSA TENGGARA TIMUR 43 Phase 3 11 7 733 1.7 124.94563 -9.25897 16918 5311020006 RABURIA NUSA TENGGARA TIMUR 391 Phase 3 97 82 353 17.8 121.65784 -8.75836 16919 5306052003 FOHOEKA NUSA TENGGARA TIMUR 126 Phase 3 31 21 793 4.7 124.94635 -9.25820 16920 5311060020 MAUROLE NUSA TENGGARA TIMUR 200 Phase 3 40 33 960 7.3 121.80630 -8.53316 16921 5305022002 NAIOLA NUSA TENGGARA TIMUR 63 Phase 3 18 12 654 2.7 124.51603 -9.55774 16922 5312071007 WAEPANA NUSA TENGGARA TIMUR 137 Phase 3 28 23 772 5.1 121.03738 -8.68352 16923 5305021010 OENAK NUSA TENGGARA TIMUR 223 Phase 3 58 40 774 8.8 124.52236 -9.56208 16924 5312082004 NGINAMANU NUSA TENGGARA TIMUR 269 Phase 3 53 44 997 9.7 121.04443 -8.66435 16925 5305021008 NIBAAF NUSA TENGGARA TIMUR 92 Phase 3 23 16 169 3.5 124.52798 -9.58246 16926 5312082004 NGINAMANU NUSA TENGGARA TIMUR 178 Phase 3 35 29 715 6.4 121.04464 -8.66222 16927 5305021008 NIBAAF NUSA TENGGARA TIMUR 590 Phase 3 147 103 341 22.3 124.52367 -9.58820 16928 5312082004 NGINAMANU NUSA TENGGARA TIMUR 120 Phase 3 24 20 376 4.4 121.05218 -8.65248 16929 5305021008 NIBAAF NUSA TENGGARA TIMUR 77 Phase 3 20 14 060 3.0 124.52674 -9.59039 16930 5312082004 NGINAMANU NUSA TENGGARA TIMUR 165 Phase 3 32 27 168 5.9 121.05639 -8.65240 16931 5303160009 SILLU NUSA TENGGARA TIMUR 302 Phase 3 63 44 289 9.6 124.06092 -10.07709 16932 5312082003 DENATANA NUSA TENGGARA TIMUR 114 Phase 3 21 17 829 3.8 121.06570 -8.62211 16933 5303141002 MUKE NUSA TENGGARA TIMUR 74 Phase 3 20 14 060 3.0 124.11836 -10.11917 16934 5312082003 DENATANA NUSA TENGGARA TIMUR 616 Phase 3 109 92 541 20.0 121.06221 -8.61938 16935 5303141002 MUKE NUSA TENGGARA TIMUR 46 Phase 3 13 9 139 2.0 124.11896 -10.11676 16936 5312082003 DENATANA NUSA TENGGARA TIMUR 55 Phase 3 10 8 490 1.8 121.07265 -8.61725 16937 5304060009 LASI NUSA TENGGARA TIMUR 189 Phase 3 46 32 338 7.0 124.42040 -9.97858 16938 5318040021 FOCOLODORAWE NUSA TENGGARA TIMUR 798 Phase 3 179 151 971 32.8 121.10412 -8.64714 16939 5306071002 TOHE NUSA TENGGARA TIMUR 123 Phase 3 33 23 199 5.0 125.11529 -9.03287 16940 5318040020 NAGERAWE NUSA TENGGARA TIMUR 89 Phase 3 20 16 980 3.7 121.12146 -8.64503 16941 5305023008 OENENU SELATAN NUSA TENGGARA TIMUR 9 Phase 3 3 2 109 0.5 124.44195 -9.43904 16942 5318040020 NAGERAWE NUSA TENGGARA TIMUR 132 Phase 3 29 24 621 5.3 121.12317 -8.64494 16943 5304050001 POLLO NUSA TENGGARA TIMUR 115 Phase 3 34 23 902 5.2 124.21304 -10.07706 16944 5318040020 NAGERAWE NUSA TENGGARA TIMUR 150 Phase 3 33 28 017 6.0 121.12417 -8.64702 16945 5304050001 POLLO NUSA TENGGARA TIMUR 140 Phase 3 42 29 526 6.4 124.20502 -10.07862 16946 5318040020 NAGERAWE NUSA TENGGARA TIMUR 198 Phase 3 44 37 356 8.1 121.12224 -8.64764 16947 5304050012 LINAMNUTU NUSA TENGGARA TIMUR 55 Phase 3 14 9 842 2.1 124.19725 -10.07011 16948 5318040020 NAGERAWE NUSA TENGGARA TIMUR 128 Phase 3 28 23 772 5.1 121.12568 -8.64703 16949 5304050012 LINAMNUTU NUSA TENGGARA TIMUR 439 Phase 3 104 73 112 15.8 124.20283 -10.06604 16950 5318040020 NAGERAWE NUSA TENGGARA TIMUR 183 Phase 3 40 33 960 7.3 121.12740 -8.64590 16951 5304050012 LINAMNUTU NUSA TENGGARA TIMUR 210 Phase 3 50 35 150 7.6 124.19572 -10.06749 16952 5312082003 DENATANA NUSA TENGGARA TIMUR 363 Phase 3 65 55 185 11.9 121.07940 -8.60948 16953 5304050012 LINAMNUTU NUSA TENGGARA TIMUR 375 Phase 3 89 62 567 13.5 124.18250 -10.05251 16954 5312082003 DENATANA NUSA TENGGARA TIMUR 79 Phase 3 14 11 886 2.6 121.08233 -8.60363 16955 5304050012 LINAMNUTU NUSA TENGGARA TIMUR 28 Phase 3 7 4 921 1.1 124.18087 -10.04900 16956 5312082003 DENATANA NUSA TENGGARA TIMUR 37 Phase 3 7 5 943 1.3 121.08083 -8.60041 16957 5304050012 LINAMNUTU NUSA TENGGARA TIMUR 645 Phase 3 153 107 559 23.2 124.17964 -10.04731 16958 5312082003 DENATANA NUSA TENGGARA TIMUR 296 Phase 3 53 44 997 9.7 121.07805 -8.59574 16959 5305042003 USAPINONOT NUSA TENGGARA TIMUR 16 Phase 3 7 4 921 1.1 124.55726 -9.49832 16960 5312082002 MAINAI NUSA TENGGARA TIMUR 124 Phase 3 21 17 829 3.8 121.09602 -8.59098 16961 5305042003 USAPINONOT NUSA TENGGARA TIMUR 19 Phase 3 8 5 624 1.2 124.55529 -9.49943 16962 5312082002 MAINAI NUSA TENGGARA TIMUR 458 Phase 3 77 65 373 14.1 121.10610 -8.59950 16963 5305042003 USAPINONOT NUSA TENGGARA TIMUR 11 Phase 3 5 3 515 0.8 124.55545 -9.50037 16964 5312082002 MAINAI NUSA TENGGARA TIMUR 43 Phase 3 8 6 792 1.5 121.09729 -8.58721 16965 5305042003 USAPINONOT NUSA TENGGARA TIMUR 178 Phase 3 73 51 319 11.1 124.55748 -9.50286 16966 5312082002 MAINAI NUSA TENGGARA TIMUR 109 Phase 3 19 16 131 3.5 121.09871 -8.58567 16967 5303161001 NUNSAEN NUSA TENGGARA TIMUR 128 Phase 3 34 23 902 5.2 123.87095 -9.95629 16968 5312082002 MAINAI NUSA TENGGARA TIMUR 84 Phase 3 14 11 886 2.6 121.08879 -8.57509 16969 5303161001 NUNSAEN NUSA TENGGARA TIMUR 93 Phase 3 25 17 575 3.8 123.87115 -9.95310 Annex II – Demand forecast results Page 82 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 16970 5312082002 MAINAI NUSA TENGGARA TIMUR 135 Phase 3 23 19 527 4.2 121.08553 -8.57295 16971 5303161002 OELBITENO NUSA TENGGARA TIMUR 119 Phase 3 30 21 090 4.6 123.86800 -9.93297 16972 5312082001 TURALOA NUSA TENGGARA TIMUR 476 Phase 3 96 81 504 17.6 121.10392 -8.55942 16973 5303161003 PASSI NUSA TENGGARA TIMUR 18 Phase 3 5 3 515 0.8 123.87885 -9.90913 16974 5312082001 TURALOA NUSA TENGGARA TIMUR 44 Phase 3 9 7 641 1.6 121.10080 -8.54577 16975 5303161003 PASSI NUSA TENGGARA TIMUR 438 Phase 3 99 69 597 15.0 123.88398 -9.90498 16976 5312082001 TURALOA NUSA TENGGARA TIMUR 78 Phase 3 16 13 584 2.9 121.09945 -8.54371 16977 5303161003 PASSI NUSA TENGGARA TIMUR 134 Phase 3 31 21 793 4.7 123.89087 -9.90132 16978 5312082001 TURALOA NUSA TENGGARA TIMUR 126 Phase 3 26 22 074 4.8 121.09564 -8.54514 16979 5303161003 PASSI NUSA TENGGARA TIMUR 41 Phase 3 10 7 030 1.5 123.89380 -9.90015 16980 5312080016 WANGKA SELATAN NUSA TENGGARA TIMUR 229 Phase 3 49 41 601 9.0 121.07777 -8.52855 16981 5303161003 PASSI NUSA TENGGARA TIMUR 14 Phase 3 4 2 812 0.6 123.89294 -9.89746 16982 5312080016 WANGKA SELATAN NUSA TENGGARA TIMUR 113 Phase 3 24 20 376 4.4 121.07576 -8.52550 16983 5303161003 PASSI NUSA TENGGARA TIMUR 221 Phase 3 50 35 150 7.6 123.89584 -9.89503 16984 5312080016 WANGKA SELATAN NUSA TENGGARA TIMUR 32 Phase 3 7 5 943 1.3 121.07421 -8.52679 16985 5303161004 NONBAUN NUSA TENGGARA TIMUR 85 Phase 3 21 14 763 3.2 123.89962 -9.89553 16986 5312080016 WANGKA SELATAN NUSA TENGGARA TIMUR 169 Phase 3 36 30 564 6.6 121.07151 -8.52660 16987 5303161004 NONBAUN NUSA TENGGARA TIMUR 34 Phase 3 9 6 327 1.4 123.90285 -9.89677 16988 5312080016 WANGKA SELATAN NUSA TENGGARA TIMUR 283 Phase 3 60 50 940 11.0 121.06713 -8.52709 16989 5303161004 NONBAUN NUSA TENGGARA TIMUR 420 Phase 3 100 70 300 15.2 123.90597 -9.89721 16990 5312080016 WANGKA SELATAN NUSA TENGGARA TIMUR 247 Phase 3 52 44 148 9.5 121.06669 -8.53073 16991 5303161004 NONBAUN NUSA TENGGARA TIMUR 415 Phase 3 99 69 597 15.0 123.90725 -9.90153 16992 5312080008 WANGKA NUSA TENGGARA TIMUR 52 Phase 3 12 10 188 2.2 121.07169 -8.51500 16993 5303161002 OELBITENO NUSA TENGGARA TIMUR 56 Phase 3 14 9 842 2.1 123.85135 -9.92896 16994 5312080008 WANGKA NUSA TENGGARA TIMUR 279 Phase 3 63 53 487 11.5 121.07386 -8.50949 16995 5303161002 OELBITENO NUSA TENGGARA TIMUR 162 Phase 3 41 28 823 6.2 123.84857 -9.92625 16996 5312080008 WANGKA NUSA TENGGARA TIMUR 137 Phase 3 31 26 319 5.7 121.07411 -8.50688 16997 5303161002 OELBITENO NUSA TENGGARA TIMUR 133 Phase 3 33 23 199 5.0 123.84255 -9.92510 16998 5312080008 WANGKA NUSA TENGGARA TIMUR 336 Phase 3 76 64 524 13.9 121.07525 -8.50499 16999 5303161002 OELBITENO NUSA TENGGARA TIMUR 659 Phase 3 164 115 292 24.9 123.82013 -9.92455 17000 5312080008 WANGKA NUSA TENGGARA TIMUR 31 Phase 3 7 5 943 1.3 121.07479 -8.50304 17001 5303182004 BITOBE NUSA TENGGARA TIMUR 113 Phase 3 26 18 278 3.9 124.00492 -9.63013 17002 5312080008 WANGKA NUSA TENGGARA TIMUR 79 Phase 3 18 15 282 3.3 121.07358 -8.50215 17003 5303182004 BITOBE NUSA TENGGARA TIMUR 352 Phase 3 79 55 537 12.0 124.00217 -9.62400 17004 5312080007 RAWANGKALO NUSA TENGGARA TIMUR 29 Phase 3 6 5 094 1.1 121.07397 -8.50162 17005 5303182004 BITOBE NUSA TENGGARA TIMUR 63 Phase 3 15 10 545 2.3 123.99468 -9.62672 17006 5312080007 RAWANGKALO NUSA TENGGARA TIMUR 16 Phase 3 4 3 396 0.7 121.07506 -8.50016 17007 5303182004 BITOBE NUSA TENGGARA TIMUR 164 Phase 3 37 26 011 5.6 123.99385 -9.62610 17008 5312080007 RAWANGKALO NUSA TENGGARA TIMUR 59 Phase 3 12 10 188 2.2 121.07507 -8.49955 17009 5303182004 BITOBE NUSA TENGGARA TIMUR 161 Phase 3 36 25 308 5.5 123.98712 -9.62742 17010 5312080007 RAWANGKALO NUSA TENGGARA TIMUR 246 Phase 3 49 41 601 9.0 121.06434 -8.49735 17011 5303182004 BITOBE NUSA TENGGARA TIMUR 57 Phase 3 13 9 139 2.0 123.98161 -9.63237 17012 5312080007 RAWANGKALO NUSA TENGGARA TIMUR 657 Phase 3 130 110 370 23.8 121.06067 -8.49479 17013 5303182004 BITOBE NUSA TENGGARA TIMUR 447 Phase 3 100 70 300 15.2 123.98708 -9.63535 17014 5312080007 RAWANGKALO NUSA TENGGARA TIMUR 127 Phase 3 26 22 074 4.8 121.06443 -8.48996 17015 5303142006 FATUTETA NUSA TENGGARA TIMUR 40 Phase 3 11 7 733 1.7 123.84366 -10.14093 17016 5312080007 RAWANGKALO NUSA TENGGARA TIMUR 23 Phase 3 5 4 245 0.9 121.05749 -8.48366 17017 5304020008 KESETNANA NUSA TENGGARA TIMUR 141 Phase 3 34 23 902 5.2 124.25159 -9.85306 17018 5312080007 RAWANGKALO NUSA TENGGARA TIMUR 59 Phase 3 12 10 188 2.2 121.05740 -8.48215 17019 5304020008 KESETNANA NUSA TENGGARA TIMUR 247 Phase 3 59 41 477 8.9 124.25302 -9.85467 17020 5312080006 TAEN TERONG NUSA TENGGARA TIMUR 75 Phase 3 16 13 584 2.9 121.03975 -8.49045 17021 5306052002 NANAET NUSA TENGGARA TIMUR 35 Phase 3 9 6 327 1.4 124.95400 -9.26118 17022 5312080006 TAEN TERONG NUSA TENGGARA TIMUR 89 Phase 3 19 16 131 3.5 121.03471 -8.48164 17023 5306052003 FOHOEKA NUSA TENGGARA TIMUR 101 Phase 3 25 17 575 3.8 124.95455 -9.26119 17024 5312080006 TAEN TERONG NUSA TENGGARA TIMUR 86 Phase 3 18 15 282 3.3 121.03036 -8.47890 17025 5306052003 FOHOEKA NUSA TENGGARA TIMUR 50 Phase 3 12 8 436 1.8 124.96974 -9.27044 17026 5312080006 TAEN TERONG NUSA TENGGARA TIMUR 189 Phase 3 39 33 111 7.1 121.02747 -8.47635 17027 5306052002 NANAET NUSA TENGGARA TIMUR 136 Phase 3 33 23 199 5.0 124.96983 -9.27142 17028 5312080006 TAEN TERONG NUSA TENGGARA TIMUR 109 Phase 3 23 19 527 4.2 121.02824 -8.47338 17029 5306052003 FOHOEKA NUSA TENGGARA TIMUR 76 Phase 3 19 13 357 2.9 124.97197 -9.27161 17030 5312080006 TAEN TERONG NUSA TENGGARA TIMUR 109 Phase 3 23 19 527 4.2 121.02752 -8.46913 17031 5306052002 NANAET NUSA TENGGARA TIMUR 59 Phase 3 14 9 842 2.1 124.97507 -9.27425 17032 5312080012 BENTENG TENGAH NUSA TENGGARA TIMUR 295 Phase 3 68 57 732 12.5 121.02182 -8.43472 17033 5306052003 FOHOEKA NUSA TENGGARA TIMUR 94 Phase 3 23 16 169 3.5 124.97571 -9.27402 17034 5312080012 BENTENG TENGAH NUSA TENGGARA TIMUR 839 Phase 3 192 163 008 35.2 121.02563 -8.42769 17035 5306052003 FOHOEKA NUSA TENGGARA TIMUR 74 Phase 3 18 12 654 2.7 124.97836 -9.27331 17036 5312080012 BENTENG TENGAH NUSA TENGGARA TIMUR 95 Phase 3 22 18 678 4.0 121.02882 -8.42528 17037 5306052003 FOHOEKA NUSA TENGGARA TIMUR 136 Phase 3 33 23 199 5.0 124.98378 -9.27073 17038 5312080012 BENTENG TENGAH NUSA TENGGARA TIMUR 160 Phase 3 37 31 413 6.8 121.03382 -8.42530 17039 5306052003 FOHOEKA NUSA TENGGARA TIMUR 196 Phase 3 47 33 041 7.1 124.98182 -9.26555 17040 5312080012 BENTENG TENGAH NUSA TENGGARA TIMUR 55 Phase 3 13 11 037 2.4 121.03737 -8.42462 17041 5306052003 FOHOEKA NUSA TENGGARA TIMUR 54 Phase 3 13 9 139 2.0 124.98044 -9.26212 17042 5312080012 BENTENG TENGAH NUSA TENGGARA TIMUR 52 Phase 3 12 10 188 2.2 121.04052 -8.42692 17043 5306052003 FOHOEKA NUSA TENGGARA TIMUR 24 Phase 3 6 4 218 0.9 124.97875 -9.25850 17044 5312080012 BENTENG TENGAH NUSA TENGGARA TIMUR 192 Phase 3 44 37 356 8.1 121.04317 -8.42291 17045 5306052003 FOHOEKA NUSA TENGGARA TIMUR 231 Phase 3 56 39 368 8.5 124.98084 -9.25328 17046 5312080011 TADHO NUSA TENGGARA TIMUR 121 Phase 3 31 26 319 5.7 121.04754 -8.41881 17047 5306052002 NANAET NUSA TENGGARA TIMUR 30 Phase 3 8 5 624 1.2 124.97810 -9.28268 17048 5312080011 TADHO NUSA TENGGARA TIMUR 70 Phase 3 18 15 282 3.3 121.04900 -8.41985 17049 5306052004 NANAENOE NUSA TENGGARA TIMUR 93 Phase 3 24 16 872 3.6 124.97856 -9.28289 17050 5312080011 TADHO NUSA TENGGARA TIMUR 84 Phase 3 21 17 829 3.8 121.05448 -8.42793 17051 5306052004 NANAENOE NUSA TENGGARA TIMUR 47 Phase 3 13 9 139 2.0 124.97956 -9.28459 17052 5312080011 TADHO NUSA TENGGARA TIMUR 240 Phase 3 60 50 940 11.0 121.09154 -8.41988 17053 5306052004 NANAENOE NUSA TENGGARA TIMUR 97 Phase 3 25 17 575 3.8 124.97776 -9.29148 17054 5312080011 TADHO NUSA TENGGARA TIMUR 143 Phase 3 36 30 564 6.6 121.09518 -8.42193 Annex II – Demand forecast results Page 83 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 17055 5306052004 NANAENOE NUSA TENGGARA TIMUR 477 Phase 3 123 86 469 18.7 124.99353 -9.30153 17056 5312080011 TADHO NUSA TENGGARA TIMUR 939 Phase 3 234 198 666 42.9 121.10044 -8.42627 17057 5304012003 TUNE NUSA TENGGARA TIMUR 84 Phase 3 23 16 169 3.5 124.30286 -9.63154 17058 5312080011 TADHO NUSA TENGGARA TIMUR 39 Phase 3 10 8 490 1.8 121.10559 -8.43164 17059 5304012003 TUNE NUSA TENGGARA TIMUR 90 Phase 3 24 16 872 3.6 124.30580 -9.63153 17060 5312080011 TADHO NUSA TENGGARA TIMUR 13 Phase 3 4 3 396 0.7 121.10855 -8.43651 17061 5304012003 TUNE NUSA TENGGARA TIMUR 71 Phase 3 19 13 357 2.9 124.30896 -9.63568 17062 5312080011 TADHO NUSA TENGGARA TIMUR 151 Phase 3 38 32 262 7.0 121.10900 -8.43932 17063 5304012003 TUNE NUSA TENGGARA TIMUR 58 Phase 3 16 11 248 2.4 124.31136 -9.63506 17064 5312080018 LENGKOSAMBI BARAT NUSA TENGGARA TIMUR 287 Phase 3 57 48 393 10.4 121.12220 -8.45042 17065 5304021007 USAPIMNASI NUSA TENGGARA TIMUR 18 Phase 3 5 3 515 0.8 124.31849 -9.63779 17066 5312080018 LENGKOSAMBI BARAT NUSA TENGGARA TIMUR 573 Phase 3 112 95 088 20.5 121.12913 -8.44817 17067 5304021007 USAPIMNASI NUSA TENGGARA TIMUR 41 Phase 3 12 8 436 1.8 124.32012 -9.63613 17068 5312080010 LENGKOSAMBI NUSA TENGGARA TIMUR 775 Phase 3 149 126 501 27.3 121.13863 -8.44625 17069 5304021007 USAPIMNASI NUSA TENGGARA TIMUR 175 Phase 3 49 34 447 7.4 124.32297 -9.63347 17070 5312080017 LENGKOSAMBI TIMUR NUSA TENGGARA TIMUR 556 Phase 3 96 81 504 17.6 121.14783 -8.44705 17071 5304012003 TUNE NUSA TENGGARA TIMUR 71 Phase 3 19 13 357 2.9 124.31842 -9.64024 17072 5312080010 LENGKOSAMBI NUSA TENGGARA TIMUR 459 Phase 3 89 75 561 16.3 121.13507 -8.42927 17073 5304021007 USAPIMNASI NUSA TENGGARA TIMUR 81 Phase 3 23 16 169 3.5 124.31948 -9.64121 17074 5312080006 TAEN TERONG NUSA TENGGARA TIMUR 174 Phase 3 36 30 564 6.6 121.03076 -8.50070 17075 5305026003 BENUS NUSA TENGGARA TIMUR 19 Phase 3 5 3 515 0.8 124.51006 -9.26955 17076 5312080006 TAEN TERONG NUSA TENGGARA TIMUR 62 Phase 3 13 11 037 2.4 121.02931 -8.49976 17077 5305041007 FATUMTASA NUSA TENGGARA TIMUR 171 Phase 3 46 32 338 7.0 124.52117 -9.27862 17078 5312080006 TAEN TERONG NUSA TENGGARA TIMUR 296 Phase 3 61 51 789 11.2 121.02868 -8.49854 17079 5305026003 BENUS NUSA TENGGARA TIMUR 125 Phase 3 27 18 981 4.1 124.52316 -9.28040 17080 5312080012 BENTENG TENGAH NUSA TENGGARA TIMUR 65 Phase 3 15 12 735 2.7 121.02380 -8.42460 17081 5305041007 FATUMTASA NUSA TENGGARA TIMUR 687 Phase 3 185 130 055 28.1 124.52641 -9.28119 17082 5312080013 NANGAMESE NUSA TENGGARA TIMUR 1 269 Phase 3 291 247 059 53.3 121.02568 -8.42119 17083 5304012003 TUNE NUSA TENGGARA TIMUR 230 Phase 3 62 43 586 9.4 124.30803 -9.62763 17084 5315040023 WANING NUSA TENGGARA TIMUR 427 Phase 3 85 72 165 15.6 120.28157 -8.47853 17085 5303141001 PATHAU NUSA TENGGARA TIMUR 319 Phase 3 90 63 270 13.7 124.08207 -10.13977 17086 5311050006 MBULIWARALAU NUSA TENGGARA TIMUR 6 Phase 3 2 1 698 0.4 121.89996 -8.80418 17087 5303141001 PATHAU NUSA TENGGARA TIMUR 340 Phase 3 96 67 488 14.6 124.07264 -10.13466 17088 5311050006 MBULIWARALAU NUSA TENGGARA TIMUR 68 Phase 3 19 16 131 3.5 121.90121 -8.80824 17089 5304081002 OELEON NUSA TENGGARA TIMUR 114 Phase 3 31 21 793 4.7 124.56869 -9.79983 17090 5311054005 KELISAMBA NUSA TENGGARA TIMUR 377 Phase 3 69 58 581 12.6 121.90465 -8.81870 17091 5304081002 OELEON NUSA TENGGARA TIMUR 110 Phase 3 30 21 090 4.6 124.55805 -9.79621 17092 5319060004 TENGKU LEDA NUSA TENGGARA TIMUR 309 Phase 3 58 49 242 10.6 120.58204 -8.44872 17093 5304081002 OELEON NUSA TENGGARA TIMUR 70 Phase 3 19 13 357 2.9 124.55701 -9.79543 17094 5313140002 WAE KAJONG NUSA TENGGARA TIMUR 532 Phase 3 115 97 635 21.1 120.34608 -8.35485 17095 5304081002 OELEON NUSA TENGGARA TIMUR 41 Phase 3 11 7 733 1.7 124.55748 -9.79839 17096 5312081005 NGARA NUSA TENGGARA TIMUR 58 Phase 3 15 12 735 2.7 121.00353 -8.50778 17097 5304081002 OELEON NUSA TENGGARA TIMUR 180 Phase 3 48 33 744 7.3 124.55579 -9.80300 17098 5312081005 NGARA NUSA TENGGARA TIMUR 135 Phase 3 33 28 017 6.0 121.00056 -8.50641 17099 5304012003 TUNE NUSA TENGGARA TIMUR 40 Phase 3 11 7 733 1.7 124.32074 -9.64453 17100 5312081005 NGARA NUSA TENGGARA TIMUR 21 Phase 3 6 5 094 1.1 120.99992 -8.50568 17101 5304021007 USAPIMNASI NUSA TENGGARA TIMUR 45 Phase 3 13 9 139 2.0 124.32163 -9.64546 17102 5312081005 NGARA NUSA TENGGARA TIMUR 219 Phase 3 53 44 997 9.7 120.99876 -8.50139 17103 5304012001 TOBU NUSA TENGGARA TIMUR 133 Phase 3 35 24 605 5.3 124.32106 -9.64649 17104 5312081005 NGARA NUSA TENGGARA TIMUR 365 Phase 3 89 75 561 16.3 120.99890 -8.49753 17105 5305020032 OESENA NUSA TENGGARA TIMUR 23 Phase 3 7 4 921 1.1 124.45552 -9.40500 17106 5311070038 WOLOGAI TENGAH NUSA TENGGARA TIMUR 85 Phase 3 21 17 829 3.8 121.80527 -8.53784 17107 5305020032 OESENA NUSA TENGGARA TIMUR 48 Phase 3 13 9 139 2.0 124.45479 -9.40641 17108 5311071017 AELIPO NUSA TENGGARA TIMUR 30 Phase 3 8 6 792 1.5 121.80548 -8.53915 17109 5305020032 OESENA NUSA TENGGARA TIMUR 11 Phase 3 3 2 109 0.5 124.45288 -9.40557 17110 5311060020 MAUROLE NUSA TENGGARA TIMUR 102 Phase 3 21 17 829 3.8 121.80479 -8.54805 17111 5305020032 OESENA NUSA TENGGARA TIMUR 215 Phase 3 57 40 071 8.6 124.45103 -9.40441 17112 5311071017 AELIPO NUSA TENGGARA TIMUR 159 Phase 3 41 34 809 7.5 121.79870 -8.55825 17113 5304011009 KUANOEL NUSA TENGGARA TIMUR 4 Phase 3 2 1 406 0.3 124.23466 -9.66676 17114 5311062010 MAUROLE SELATAN NUSA TENGGARA TIMUR 135 Phase 3 31 26 319 5.7 121.81464 -8.56762 17115 5304011009 KUANOEL NUSA TENGGARA TIMUR 16 Phase 3 5 3 515 0.8 124.23442 -9.66731 17116 5311062010 MAUROLE SELATAN NUSA TENGGARA TIMUR 104 Phase 3 24 20 376 4.4 121.82422 -8.57600 17117 5304010016 TUNUA NUSA TENGGARA TIMUR 23 Phase 3 6 4 218 0.9 124.23481 -9.66861 17118 5311062010 MAUROLE SELATAN NUSA TENGGARA TIMUR 181 Phase 3 41 34 809 7.5 121.83078 -8.58362 17119 5304010016 TUNUA NUSA TENGGARA TIMUR 17 Phase 3 5 3 515 0.8 124.23511 -9.67027 17120 5311062010 MAUROLE SELATAN NUSA TENGGARA TIMUR 157 Phase 3 36 30 564 6.6 121.83442 -8.59301 17121 5304010016 TUNUA NUSA TENGGARA TIMUR 31 Phase 3 9 6 327 1.4 124.23674 -9.67631 17122 5311062013 WATUNGGERE MARILONGA NUSA TENGGARA TIMUR 498 Phase 3 82 69 618 15.0 121.83739 -8.59391 17123 5304010003 LELOBOKO NUSA TENGGARA TIMUR 20 Phase 3 6 4 218 0.9 124.22792 -9.67856 17124 5311062008 NIDA NUSA TENGGARA TIMUR 356 Phase 3 78 66 222 14.3 121.84065 -8.59456 17125 5304010003 LELOBOKO NUSA TENGGARA TIMUR 74 Phase 3 19 13 357 2.9 124.22682 -9.67821 17126 5311062011 UNGGU NUSA TENGGARA TIMUR 162 Phase 3 35 29 715 6.4 121.85692 -8.60532 17127 5304010003 LELOBOKO NUSA TENGGARA TIMUR 27 Phase 3 7 4 921 1.1 124.22466 -9.67770 17128 5311062008 NIDA NUSA TENGGARA TIMUR 151 Phase 3 34 28 866 6.2 121.86028 -8.59893 17129 5304010003 LELOBOKO NUSA TENGGARA TIMUR 116 Phase 3 30 21 090 4.6 124.22158 -9.67795 17130 5311062011 UNGGU NUSA TENGGARA TIMUR 233 Phase 3 50 42 450 9.2 121.86644 -8.59545 17131 5304010003 LELOBOKO NUSA TENGGARA TIMUR 20 Phase 3 6 4 218 0.9 124.22050 -9.67828 17132 5311062009 WATUNGGERE NUSA TENGGARA TIMUR 661 Phase 3 157 133 293 28.8 121.86102 -8.58722 17133 5304010003 LELOBOKO NUSA TENGGARA TIMUR 40 Phase 3 11 7 733 1.7 124.21943 -9.67854 17134 5311062012 NGGESA BIRI NUSA TENGGARA TIMUR 202 Phase 3 43 36 507 7.9 121.83104 -8.60021 17135 5304011009 KUANOEL NUSA TENGGARA TIMUR 23 Phase 3 7 4 921 1.1 124.19789 -9.66551 17136 5311062012 NGGESA BIRI NUSA TENGGARA TIMUR 63 Phase 3 14 11 886 2.6 121.82737 -8.60987 17137 5304011009 KUANOEL NUSA TENGGARA TIMUR 9 Phase 3 3 2 109 0.5 124.19178 -9.67219 17138 5311062012 NGGESA BIRI NUSA TENGGARA TIMUR 52 Phase 3 11 9 339 2.0 121.82023 -8.60307 17139 5304011009 KUANOEL NUSA TENGGARA TIMUR 52 Phase 3 14 9 842 2.1 124.19161 -9.67339 Annex II – Demand forecast results Page 84 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 17140 5311062003 NGGESA NUSA TENGGARA TIMUR 540 Phase 3 107 90 843 19.6 121.81884 -8.60269 17141 5304010003 LELOBOKO NUSA TENGGARA TIMUR 75 Phase 3 20 14 060 3.0 124.18736 -9.68466 17142 5311062012 NGGESA BIRI NUSA TENGGARA TIMUR 111 Phase 3 24 20 376 4.4 121.82275 -8.61494 17143 5304010003 LELOBOKO NUSA TENGGARA TIMUR 147 Phase 3 38 26 714 5.8 124.17905 -9.68941 17144 5311062004 DETUKELI NUSA TENGGARA TIMUR 57 Phase 3 14 11 886 2.6 121.82243 -8.61693 17145 5304010003 LELOBOKO NUSA TENGGARA TIMUR 102 Phase 3 27 18 981 4.1 124.17518 -9.69249 17146 5311062004 DETUKELI NUSA TENGGARA TIMUR 48 Phase 3 12 10 188 2.2 121.81928 -8.62611 17147 5304010003 LELOBOKO NUSA TENGGARA TIMUR 36 Phase 3 10 7 030 1.5 124.17292 -9.69315 17148 5311062004 DETUKELI NUSA TENGGARA TIMUR 125 Phase 3 30 25 470 5.5 121.82031 -8.62977 17149 5304010003 LELOBOKO NUSA TENGGARA TIMUR 258 Phase 3 66 46 398 10.0 124.17116 -9.69440 17150 5311062004 DETUKELI NUSA TENGGARA TIMUR 385 Phase 3 91 77 259 16.7 121.81991 -8.63144 17151 5304010003 LELOBOKO NUSA TENGGARA TIMUR 50 Phase 3 13 9 139 2.0 124.16962 -9.69416 17152 5311062004 DETUKELI NUSA TENGGARA TIMUR 64 Phase 3 16 13 584 2.9 121.82121 -8.63289 17153 5304010003 LELOBOKO NUSA TENGGARA TIMUR 48 Phase 3 13 9 139 2.0 124.17001 -9.70009 17154 5311062006 KANGANARA NUSA TENGGARA TIMUR 334 Phase 3 79 67 071 14.5 121.82859 -8.63743 17155 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 34 Phase 3 9 6 327 1.4 124.16385 -9.70972 17156 5311062005 KEBESANI NUSA TENGGARA TIMUR 96 Phase 3 23 19 527 4.2 121.82818 -8.64071 17157 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 81 Phase 3 21 14 763 3.2 124.16470 -9.71177 17158 5313130021 RIUNG NUSA TENGGARA TIMUR 421 Phase 3 86 73 014 15.8 120.48175 -8.41067 17159 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 44 Phase 3 12 8 436 1.8 124.16590 -9.71386 17160 5312070018 INEGENA NUSA TENGGARA TIMUR 393 Phase 3 79 67 071 14.5 120.99480 -8.68511 17161 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 121 Phase 3 31 21 793 4.7 124.17014 -9.71653 17162 5318030007 WOKODEKORORO NUSA TENGGARA TIMUR 199 Phase 3 42 35 658 7.7 121.34088 -8.82777 17163 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 43 Phase 3 11 7 733 1.7 124.17365 -9.71581 17164 5311060020 MAUROLE NUSA TENGGARA TIMUR 49 Phase 3 10 8 490 1.8 121.81170 -8.53425 17165 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 173 Phase 3 45 31 635 6.8 124.17362 -9.71891 17166 5311060021 WATUKAMBA NUSA TENGGARA TIMUR 70 Phase 3 16 13 584 2.9 121.82896 -8.53889 17167 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 386 Phase 3 99 69 597 15.0 124.15947 -9.71373 17168 5311060021 WATUKAMBA NUSA TENGGARA TIMUR 153 Phase 3 34 28 866 6.2 121.83963 -8.54128 17169 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 51 Phase 3 13 9 139 2.0 124.15577 -9.71747 17170 5311060021 WATUKAMBA NUSA TENGGARA TIMUR 1 Phase 3 1 849 0.2 121.84529 -8.53228 17171 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 88 Phase 3 23 16 169 3.5 124.15481 -9.72013 17172 5311060024 DETUWULU NUSA TENGGARA TIMUR 97 Phase 3 22 18 678 4.0 121.84473 -8.53191 17173 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 162 Phase 3 42 29 526 6.4 124.15360 -9.72519 17174 5311060024 DETUWULU NUSA TENGGARA TIMUR 101 Phase 3 23 19 527 4.2 121.85366 -8.52431 17175 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 40 Phase 3 11 7 733 1.7 124.15176 -9.72894 17176 5311060022 AEWORA NUSA TENGGARA TIMUR 96 Phase 3 23 19 527 4.2 121.86191 -8.51241 17177 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 48 Phase 3 13 9 139 2.0 124.14841 -9.73290 17178 5311060022 AEWORA NUSA TENGGARA TIMUR 79 Phase 3 19 16 131 3.5 121.86755 -8.50406 17179 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 6 Phase 3 2 1 406 0.3 124.14759 -9.73377 17180 5311060022 AEWORA NUSA TENGGARA TIMUR 1 349 Phase 3 317 269 133 58.1 121.86072 -8.49640 17181 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 12 Phase 3 4 2 812 0.6 124.14542 -9.73490 17182 5311060022 AEWORA NUSA TENGGARA TIMUR 124 Phase 3 30 25 470 5.5 121.85820 -8.49751 17183 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 39 Phase 3 10 7 030 1.5 124.14419 -9.73712 17184 5311060022 AEWORA NUSA TENGGARA TIMUR 12 Phase 3 3 2 547 0.5 121.87489 -8.50096 17185 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 20 Phase 3 6 4 218 0.9 124.14345 -9.73855 17186 5311060022 AEWORA NUSA TENGGARA TIMUR 14 Phase 3 4 3 396 0.7 121.87515 -8.50095 17187 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 170 Phase 3 44 30 932 6.7 124.13536 -9.74671 17188 5311060022 AEWORA NUSA TENGGARA TIMUR 268 Phase 3 63 53 487 11.5 121.87658 -8.50070 17189 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 108 Phase 3 28 19 684 4.2 124.12860 -9.75342 17190 5311060022 AEWORA NUSA TENGGARA TIMUR 26 Phase 3 7 5 943 1.3 121.87672 -8.49986 17191 5304022005 OEUBAN NUSA TENGGARA TIMUR 486 Phase 3 126 88 578 19.1 124.11318 -9.77178 17192 5311060022 AEWORA NUSA TENGGARA TIMUR 48 Phase 3 12 10 188 2.2 121.87848 -8.50029 17193 5304022005 OEUBAN NUSA TENGGARA TIMUR 478 Phase 3 124 87 172 18.8 124.11479 -9.77312 17194 5311060022 AEWORA NUSA TENGGARA TIMUR 98 Phase 3 24 20 376 4.4 121.87877 -8.49965 17195 5304022005 OEUBAN NUSA TENGGARA TIMUR 179 Phase 3 47 33 041 7.1 124.11492 -9.77577 17196 5312081002 RIA NUSA TENGGARA TIMUR 988 Phase 3 210 178 290 38.5 120.95729 -8.50307 17197 5304022005 OEUBAN NUSA TENGGARA TIMUR 99 Phase 3 26 18 278 3.9 124.11124 -9.79562 17198 5318030007 WOKODEKORORO NUSA TENGGARA TIMUR 165 Phase 3 35 29 715 6.4 121.36468 -8.82156 17199 5304022005 OEUBAN NUSA TENGGARA TIMUR 142 Phase 3 37 26 011 5.6 124.10968 -9.79582 17200 5318030018 WOEWUTU NUSA TENGGARA TIMUR 113 Phase 3 30 25 470 5.5 121.36912 -8.82065 17201 5304022001 BESANA NUSA TENGGARA TIMUR 1 384 Phase 3 349 245 347 52.9 124.09595 -9.79444 17202 5318030018 WOEWUTU NUSA TENGGARA TIMUR 109 Phase 3 29 24 621 5.3 121.36981 -8.81279 17203 5304022005 OEUBAN NUSA TENGGARA TIMUR 133 Phase 3 35 24 605 5.3 124.10979 -9.80514 17204 5318030018 WOEWUTU NUSA TENGGARA TIMUR 226 Phase 3 60 50 940 11.0 121.37274 -8.80711 17205 5304022004 SALBAIT NUSA TENGGARA TIMUR 356 Phase 3 100 70 300 15.2 124.11677 -9.81030 17206 5318030018 WOEWUTU NUSA TENGGARA TIMUR 78 Phase 3 21 17 829 3.8 121.36765 -8.80518 17207 5305022004 OELAMI NUSA TENGGARA TIMUR 46 Phase 3 12 8 436 1.8 124.47776 -9.49970 17208 5318030018 WOEWUTU NUSA TENGGARA TIMUR 193 Phase 3 51 43 299 9.3 121.36455 -8.80777 17209 5305022004 OELAMI NUSA TENGGARA TIMUR 26 Phase 3 7 4 921 1.1 124.47682 -9.50020 17210 5313123003 TENGKU LESE NUSA TENGGARA TIMUR 125 Phase 3 28 23 772 5.1 120.38188 -8.53227 17211 5305022004 OELAMI NUSA TENGGARA TIMUR 201 Phase 3 53 37 259 8.0 124.47263 -9.50314 17212 5313123008 BUAR NUSA TENGGARA TIMUR 198 Phase 3 44 37 356 8.1 120.37431 -8.53094 17213 5305022004 OELAMI NUSA TENGGARA TIMUR 129 Phase 3 34 23 902 5.2 124.47322 -9.50409 17214 5313120017 KAKOR NUSA TENGGARA TIMUR 239 Phase 3 50 42 450 9.2 120.42505 -8.57621 17215 5314060009 SOTIMORI NUSA TENGGARA TIMUR 1 213 Phase 3 284 199 652 43.1 123.31055 -10.53662 17216 5315011003 MBUIT NUSA TENGGARA TIMUR 132 Phase 3 31 26 319 5.7 120.10787 -8.48756 17217 5314060010 DAIAMA NUSA TENGGARA TIMUR 1 822 Phase 3 435 305 805 66.0 123.37982 -10.51406 17218 5315011003 MBUIT NUSA TENGGARA TIMUR 227 Phase 3 53 44 997 9.7 120.10188 -8.49263 17219 5304050011 KIUBAAT NUSA TENGGARA TIMUR 75 Phase 3 19 13 357 2.9 124.25343 -10.02766 17220 5319030003 PAAN WARU NUSA TENGGARA TIMUR 164 Phase 3 37 31 413 6.8 120.76877 -8.63813 17221 5319030003 PAAN WARU NUSA TENGGARA TIMUR 156 Phase 3 36 30 564 6.6 120.77958 -8.62701 17222 5303182001 FATUMONAS NUSA TENGGARA TIMUR 56 Phase 3 13 9 139 2.0 124.03262 -9.68968 17223 5319030003 PAAN WARU NUSA TENGGARA TIMUR 475 Phase 3 108 91 692 19.8 120.78802 -8.62874 17224 5303170004 HUEKNUTU NUSA TENGGARA TIMUR 93 Phase 3 23 16 169 3.5 124.00606 -9.87073 Annex II – Demand forecast results Page 85 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 17225 5312081001 WOLOMEZE NUSA TENGGARA TIMUR 146 Phase 3 32 27 168 5.9 120.94598 -8.53140 17226 5303170004 HUEKNUTU NUSA TENGGARA TIMUR 84 Phase 3 21 14 763 3.2 124.00239 -9.86824 17227 5312081001 WOLOMEZE NUSA TENGGARA TIMUR 172 Phase 3 37 31 413 6.8 120.94712 -8.53395 17228 5303170004 HUEKNUTU NUSA TENGGARA TIMUR 460 Phase 3 113 79 439 17.1 123.99159 -9.85822 17229 5312081001 WOLOMEZE NUSA TENGGARA TIMUR 33 Phase 3 8 6 792 1.5 120.94308 -8.53178 17230 5304111004 SAMBET NUSA TENGGARA TIMUR 139 Phase 3 33 23 199 5.0 124.74764 -9.65641 17231 5312081001 WOLOMEZE NUSA TENGGARA TIMUR 479 Phase 3 103 87 447 18.9 120.91471 -8.53102 17232 5304112006 NITI NUSA TENGGARA TIMUR 154 Phase 3 36 25 308 5.5 124.74621 -9.65478 17233 5312081003 LANAMAI NUSA TENGGARA TIMUR 296 Phase 3 65 55 185 11.9 120.90757 -8.52196 17234 5304042005 NAUKAE NUSA TENGGARA TIMUR 202 Phase 3 54 37 962 8.2 124.41119 -9.80279 17235 5312081003 LANAMAI NUSA TENGGARA TIMUR 135 Phase 3 30 25 470 5.5 120.90239 -8.52009 17236 5304111003 TOIANAS NUSA TENGGARA TIMUR 87 Phase 3 25 17 575 3.8 124.77713 -9.70404 17237 5312081003 LANAMAI NUSA TENGGARA TIMUR 161 Phase 3 36 30 564 6.6 120.90101 -8.52157 17238 5304111003 TOIANAS NUSA TENGGARA TIMUR 97 Phase 3 28 19 684 4.2 124.78277 -9.70223 17239 5312081003 LANAMAI NUSA TENGGARA TIMUR 187 Phase 3 41 34 809 7.5 120.89383 -8.52183 17240 5304111003 TOIANAS NUSA TENGGARA TIMUR 225 Phase 3 64 44 992 9.7 124.78983 -9.70106 17241 5312081003 LANAMAI NUSA TENGGARA TIMUR 186 Phase 3 41 34 809 7.5 120.88428 -8.51889 17242 5303162005 TUAKAU NUSA TENGGARA TIMUR 123 Phase 3 28 19 684 4.2 123.67890 -9.81061 17243 5312081003 LANAMAI NUSA TENGGARA TIMUR 252 Phase 3 56 47 544 10.3 120.88186 -8.51941 17244 5306023001 FATOIN NUSA TENGGARA TIMUR 104 Phase 3 25 17 575 3.8 124.76013 -9.54685 17245 5312081003 LANAMAI NUSA TENGGARA TIMUR 234 Phase 3 52 44 148 9.5 120.88121 -8.51821 17246 5304080012 BILLA NUSA TENGGARA TIMUR 113 Phase 3 35 24 605 5.3 124.54548 -9.68266 17247 5319060003 COMPANG MEKAR NUSA TENGGARA TIMUR 95 Phase 3 25 21 225 4.6 120.58524 -8.44720 17248 5304080005 OELET NUSA TENGGARA TIMUR 59 Phase 3 16 11 248 2.4 124.53986 -9.68517 17249 5313140002 WAE KAJONG NUSA TENGGARA TIMUR 231 Phase 3 50 42 450 9.2 120.36057 -8.35247 17250 5304080005 OELET NUSA TENGGARA TIMUR 150 Phase 3 40 28 120 6.1 124.53514 -9.69256 17251 5313140018 TOE NUSA TENGGARA TIMUR 233 Phase 3 52 44 148 9.5 120.37212 -8.34312 17252 5304080005 OELET NUSA TENGGARA TIMUR 100 Phase 3 27 18 981 4.1 124.53556 -9.69830 17253 5313140018 TOE NUSA TENGGARA TIMUR 347 Phase 3 78 66 222 14.3 120.37291 -8.34117 17254 5304080005 OELET NUSA TENGGARA TIMUR 684 Phase 3 178 125 134 27.0 124.53438 -9.70556 17255 5313140018 TOE NUSA TENGGARA TIMUR 75 Phase 3 17 14 433 3.1 120.37219 -8.33935 17256 5304072007 ABI NUSA TENGGARA TIMUR 181 Phase 3 54 37 962 8.2 124.53506 -9.67699 17257 5313140018 TOE NUSA TENGGARA TIMUR 70 Phase 3 16 13 584 2.9 120.37465 -8.32210 17258 5304072007 ABI NUSA TENGGARA TIMUR 95 Phase 3 29 20 387 4.4 124.52900 -9.67746 17259 5313140018 TOE NUSA TENGGARA TIMUR 120 Phase 3 27 22 923 4.9 120.37585 -8.32146 17260 5304072007 ABI NUSA TENGGARA TIMUR 177 Phase 3 53 37 259 8.0 124.51486 -9.68065 17261 5313140017 RURA NUSA TENGGARA TIMUR 194 Phase 3 50 42 450 9.2 120.38614 -8.32549 17262 5304072007 ABI NUSA TENGGARA TIMUR 67 Phase 3 20 14 060 3.0 124.51155 -9.68473 17263 5313140017 RURA NUSA TENGGARA TIMUR 291 Phase 3 75 63 675 13.7 120.39123 -8.32977 17264 5304072007 ABI NUSA TENGGARA TIMUR 145 Phase 3 43 30 229 6.5 124.51117 -9.68854 17265 5313140017 RURA NUSA TENGGARA TIMUR 254 Phase 3 66 56 034 12.1 120.39527 -8.32306 17266 5304072007 ABI NUSA TENGGARA TIMUR 59 Phase 3 18 12 654 2.7 124.51082 -9.69202 17267 5313140017 RURA NUSA TENGGARA TIMUR 100 Phase 3 26 22 074 4.8 120.38836 -8.31033 17268 5306071004 AITOUN NUSA TENGGARA TIMUR 299 Phase 3 91 63 973 13.8 125.14135 -9.05847 17269 5313140015 ROBEK NUSA TENGGARA TIMUR 244 Phase 3 62 52 638 11.4 120.37394 -8.29124 17270 5303170006 OELNAINENO NUSA TENGGARA TIMUR 924 Phase 3 214 150 442 32.5 123.98212 -9.84504 17271 5313140015 ROBEK NUSA TENGGARA TIMUR 55 Phase 3 14 11 886 2.6 120.37517 -8.29003 17272 5306050004 LAWALUTOLUS NUSA TENGGARA TIMUR 77 Phase 3 19 13 357 2.9 124.91046 -9.27930 17273 5313140015 ROBEK NUSA TENGGARA TIMUR 251 Phase 3 64 54 336 11.7 120.39233 -8.28606 17274 5306050004 LAWALUTOLUS NUSA TENGGARA TIMUR 281 Phase 3 67 47 101 10.2 124.90750 -9.28190 17275 5313140015 ROBEK NUSA TENGGARA TIMUR 518 Phase 3 131 111 219 24.0 120.40303 -8.28398 17276 5314040007 LIMAKOLI NUSA TENGGARA TIMUR 549 Phase 3 139 97 717 21.1 123.17449 -10.71281 17277 5313140015 ROBEK NUSA TENGGARA TIMUR 47 Phase 3 12 10 188 2.2 120.40370 -8.28254 17278 5314040008 SUEBELA NUSA TENGGARA TIMUR 908 Phase 3 241 169 423 36.6 123.20761 -10.69425 17279 5313140015 ROBEK NUSA TENGGARA TIMUR 442 Phase 3 112 95 088 20.5 120.40826 -8.28243 17280 5304010003 LELOBOKO NUSA TENGGARA TIMUR 24 Phase 3 7 4 921 1.1 124.17129 -9.68254 17281 5313140019 PARA LANDO NUSA TENGGARA TIMUR 590 Phase 3 146 123 954 26.7 120.35527 -8.29154 17282 5304010003 LELOBOKO NUSA TENGGARA TIMUR 9 Phase 3 3 2 109 0.5 124.17133 -9.68224 17283 5319060008 GOLO RENTUNG NUSA TENGGARA TIMUR 204 Phase 3 55 46 695 10.1 120.58771 -8.43728 17284 5304013003 NUNBENA NUSA TENGGARA TIMUR 140 Phase 3 35 24 605 5.3 124.15478 -9.67823 17285 5319060008 GOLO RENTUNG NUSA TENGGARA TIMUR 64 Phase 3 18 15 282 3.3 120.59023 -8.43560 17286 5304013003 NUNBENA NUSA TENGGARA TIMUR 94 Phase 3 24 16 872 3.6 124.15357 -9.67635 17287 5319060003 COMPANG MEKAR NUSA TENGGARA TIMUR 80 Phase 3 21 17 829 3.8 120.59996 -8.44063 17288 5304013003 NUNBENA NUSA TENGGARA TIMUR 35 Phase 3 9 6 327 1.4 124.15295 -9.67508 17289 5319060003 COMPANG MEKAR NUSA TENGGARA TIMUR 72 Phase 3 19 16 131 3.5 120.59784 -8.44722 17290 5304013003 NUNBENA NUSA TENGGARA TIMUR 86 Phase 3 22 15 466 3.3 124.14924 -9.67412 17291 5319060003 COMPANG MEKAR NUSA TENGGARA TIMUR 195 Phase 3 50 42 450 9.2 120.59665 -8.44905 17292 5304013003 NUNBENA NUSA TENGGARA TIMUR 48 Phase 3 12 8 436 1.8 124.14723 -9.67526 17293 5319060003 COMPANG MEKAR NUSA TENGGARA TIMUR 346 Phase 3 89 75 561 16.3 120.60343 -8.45328 17294 5304013003 NUNBENA NUSA TENGGARA TIMUR 57 Phase 3 15 10 545 2.3 124.14782 -9.67755 17295 5319060009 GOLO LEMBUR NUSA TENGGARA TIMUR 468 Phase 3 107 90 843 19.6 120.61059 -8.46030 17296 5304013003 NUNBENA NUSA TENGGARA TIMUR 36 Phase 3 9 6 327 1.4 124.14822 -9.68062 17297 5319060003 COMPANG MEKAR NUSA TENGGARA TIMUR 179 Phase 3 46 39 054 8.4 120.61218 -8.44813 17298 5304013002 LILIANA NUSA TENGGARA TIMUR 180 Phase 3 50 35 150 7.6 124.14864 -9.68942 17299 5319060003 COMPANG MEKAR NUSA TENGGARA TIMUR 91 Phase 3 24 20 376 4.4 120.61615 -8.44653 17300 5304013002 LILIANA NUSA TENGGARA TIMUR 39 Phase 3 11 7 733 1.7 124.14531 -9.69197 17301 5319060009 GOLO LEMBUR NUSA TENGGARA TIMUR 142 Phase 3 33 28 017 6.0 120.62059 -8.45145 17302 5304013002 LILIANA NUSA TENGGARA TIMUR 512 Phase 3 142 99 826 21.5 124.14260 -9.69523 17303 5319060009 GOLO LEMBUR NUSA TENGGARA TIMUR 81 Phase 3 19 16 131 3.5 120.63598 -8.45396 17304 5304013002 LILIANA NUSA TENGGARA TIMUR 72 Phase 3 20 14 060 3.0 124.14234 -9.68916 17305 5319060010 GOLO NIMBUNG NUSA TENGGARA TIMUR 964 Phase 3 213 180 837 39.0 120.64752 -8.44155 17306 5304013002 LILIANA NUSA TENGGARA TIMUR 32 Phase 3 9 6 327 1.4 124.14075 -9.68969 17307 5319030009 TENO MESE NUSA TENGGARA TIMUR 248 Phase 3 49 41 601 9.0 120.77900 -8.61552 17308 5304013003 NUNBENA NUSA TENGGARA TIMUR 165 Phase 3 41 28 823 6.2 124.14846 -9.67309 17309 5319030003 PAAN WARU NUSA TENGGARA TIMUR 496 Phase 3 112 95 088 20.5 120.78410 -8.61500 Annex II – Demand forecast results Page 86 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 17310 5304013003 NUNBENA NUSA TENGGARA TIMUR 348 Phase 3 86 60 458 13.0 124.15021 -9.67060 17311 5310011007 PARABUBU NUSA TENGGARA TIMUR 46 Phase 3 13 11 037 2.4 122.02902 -8.64757 17312 5304051002 TEAS NUSA TENGGARA TIMUR 163 Phase 3 43 30 229 6.5 124.30867 -9.93147 17313 5310011007 PARABUBU NUSA TENGGARA TIMUR 65 Phase 3 18 15 282 3.3 122.02368 -8.64266 17314 5304022003 KOA NUSA TENGGARA TIMUR 157 Phase 3 45 31 635 6.8 124.11953 -9.92570 17315 5310011007 PARABUBU NUSA TENGGARA TIMUR 332 Phase 3 89 75 561 16.3 122.01516 -8.64009 17316 5304010003 LELOBOKO NUSA TENGGARA TIMUR 43 Phase 3 11 7 733 1.7 124.18903 -9.68620 17317 5310012018 POMA NUSA TENGGARA TIMUR 409 Phase 3 118 100 182 21.6 122.00421 -8.64104 17318 5304060004 KUSI NUSA TENGGARA TIMUR 65 Phase 3 16 11 248 2.4 124.47440 -10.04831 17319 5310011007 PARABUBU NUSA TENGGARA TIMUR 81 Phase 3 22 18 678 4.0 122.01542 -8.63158 17320 5306070018 TIALAI NUSA TENGGARA TIMUR 256 Phase 3 61 42 883 9.3 124.90550 -9.18112 17321 5310011007 PARABUBU NUSA TENGGARA TIMUR 230 Phase 3 61 51 789 11.2 122.01580 -8.62981 17322 5304021006 BIJELI NUSA TENGGARA TIMUR 104 Phase 3 29 20 387 4.4 124.32257 -9.65020 17323 5318010019 KOTAGANA NUSA TENGGARA TIMUR 220 Phase 3 57 48 393 10.4 121.24044 -8.88860 17324 5304021006 BIJELI NUSA TENGGARA TIMUR 88 Phase 3 25 17 575 3.8 124.32381 -9.65425 17325 5311020012 JAMOKEASA NUSA TENGGARA TIMUR 41 Phase 3 10 8 490 1.8 121.64105 -8.72704 17326 5304012001 TOBU NUSA TENGGARA TIMUR 39 Phase 3 11 7 733 1.7 124.32388 -9.65575 17327 5311020012 JAMOKEASA NUSA TENGGARA TIMUR 162 Phase 3 36 30 564 6.6 121.64129 -8.72425 17328 5304021006 BIJELI NUSA TENGGARA TIMUR 25 Phase 3 7 4 921 1.1 124.32416 -9.65820 17329 5311020010 WOLOGAI NUSA TENGGARA TIMUR 39 Phase 3 10 8 490 1.8 121.64301 -8.70112 17330 5304012001 TOBU NUSA TENGGARA TIMUR 12 Phase 3 4 2 812 0.6 124.32376 -9.65871 17331 5311020010 WOLOGAI NUSA TENGGARA TIMUR 52 Phase 3 13 11 037 2.4 121.64161 -8.69394 17332 5304021006 BIJELI NUSA TENGGARA TIMUR 73 Phase 3 21 14 763 3.2 124.32543 -9.66329 17333 5311020010 WOLOGAI NUSA TENGGARA TIMUR 218 Phase 3 51 43 299 9.3 121.64165 -8.69170 17334 5304021006 BIJELI NUSA TENGGARA TIMUR 80 Phase 3 23 16 169 3.5 124.32739 -9.66625 17335 5311012004 BOAFEO NUSA TENGGARA TIMUR 418 Phase 3 98 83 202 18.0 121.62595 -8.69011 17336 5304021006 BIJELI NUSA TENGGARA TIMUR 206 Phase 3 58 40 774 8.8 124.33220 -9.66895 17337 5311012004 BOAFEO NUSA TENGGARA TIMUR 84 Phase 3 20 16 980 3.7 121.62371 -8.68251 17338 5304021006 BIJELI NUSA TENGGARA TIMUR 19 Phase 3 6 4 218 0.9 124.33232 -9.67036 17339 5311012001 KEBIRANGGA SELATAN NUSA TENGGARA TIMUR 394 Phase 3 84 71 316 15.4 121.60246 -8.66771 17340 5304021006 BIJELI NUSA TENGGARA TIMUR 121 Phase 3 34 23 902 5.2 124.33421 -9.67163 17341 5311012001 KEBIRANGGA SELATAN NUSA TENGGARA TIMUR 107 Phase 3 23 19 527 4.2 121.59584 -8.65613 17342 5306050004 LAWALUTOLUS NUSA TENGGARA TIMUR 204 Phase 3 48 33 744 7.3 124.91131 -9.28532 17343 5311012010 KEBIRANGGA TENGAH NUSA TENGGARA TIMUR 176 Phase 3 36 30 564 6.6 121.56960 -8.64842 17344 5305043004 TAINSALA NUSA TENGGARA TIMUR 124 Phase 3 32 22 496 4.9 124.60029 -9.22464 17345 5311012010 KEBIRANGGA TENGAH NUSA TENGGARA TIMUR 621 Phase 3 126 106 974 23.1 121.55266 -8.64132 17346 5305043004 TAINSALA NUSA TENGGARA TIMUR 21 Phase 3 6 4 218 0.9 124.60283 -9.22943 17347 5311012003 KEBIRANGGA NUSA TENGGARA TIMUR 217 Phase 3 46 39 054 8.4 121.53939 -8.62934 17348 5305043004 TAINSALA NUSA TENGGARA TIMUR 1 426 Phase 3 360 253 080 54.6 124.60098 -9.24209 17349 5311012003 KEBIRANGGA NUSA TENGGARA TIMUR 149 Phase 3 32 27 168 5.9 121.52400 -8.62594 17350 5305044004 FAFINESU C NUSA TENGGARA TIMUR 639 Phase 3 167 117 401 25.3 124.58234 -9.34735 17351 5318070005 TENDA KINDE NUSA TENGGARA TIMUR 228 Phase 3 57 48 393 10.4 121.51833 -8.62109 17352 5304101012 MEUSIN NUSA TENGGARA TIMUR 245 Phase 3 46 32 338 7.0 124.75117 -9.82527 17353 5318070005 TENDA KINDE NUSA TENGGARA TIMUR 355 Phase 3 88 74 712 16.1 121.51669 -8.61643 17354 5304101012 MEUSIN NUSA TENGGARA TIMUR 132 Phase 3 25 17 575 3.8 124.74897 -9.82492 17355 5311012003 KEBIRANGGA NUSA TENGGARA TIMUR 354 Phase 3 75 63 675 13.7 121.52115 -8.61510 17356 5304101012 MEUSIN NUSA TENGGARA TIMUR 26 Phase 3 5 3 515 0.8 124.74131 -9.81821 17357 5311012003 KEBIRANGGA NUSA TENGGARA TIMUR 854 Phase 3 181 153 669 33.2 121.52510 -8.61485 17358 5304101012 MEUSIN NUSA TENGGARA TIMUR 44 Phase 3 9 6 327 1.4 124.74008 -9.81555 17359 5318070005 TENDA KINDE NUSA TENGGARA TIMUR 256 Phase 3 64 54 336 11.7 121.50468 -8.62984 17360 5304101012 MEUSIN NUSA TENGGARA TIMUR 11 Phase 3 3 2 109 0.5 124.73968 -9.81541 17361 5318070005 TENDA KINDE NUSA TENGGARA TIMUR 77 Phase 3 20 16 980 3.7 121.50155 -8.63107 17362 5304101012 MEUSIN NUSA TENGGARA TIMUR 365 Phase 3 68 47 804 10.3 124.73891 -9.81324 17363 5318070004 TENDATOTO NUSA TENGGARA TIMUR 89 Phase 3 20 16 980 3.7 121.49826 -8.63458 17364 5303142005 RAKNAMO NUSA TENGGARA TIMUR 225 Phase 3 50 35 150 7.6 123.90070 -10.12020 17365 5318070005 TENDA KINDE NUSA TENGGARA TIMUR 200 Phase 3 50 42 450 9.2 121.49861 -8.63492 17366 5303142005 RAKNAMO NUSA TENGGARA TIMUR 111 Phase 3 25 17 575 3.8 123.89988 -10.11772 17367 5318070004 TENDATOTO NUSA TENGGARA TIMUR 103 Phase 3 23 19 527 4.2 121.49550 -8.63402 17368 5314041002 DODAEK NUSA TENGGARA TIMUR 430 Phase 3 109 76 627 16.5 123.21558 -10.80902 17369 5318070005 TENDA KINDE NUSA TENGGARA TIMUR 213 Phase 3 53 44 997 9.7 121.49521 -8.63248 17370 5305027004 KUAKEN NUSA TENGGARA TIMUR 369 Phase 3 107 75 221 16.2 124.54098 -9.56280 17371 5318070005 TENDA KINDE NUSA TENGGARA TIMUR 39 Phase 3 10 8 490 1.8 121.49244 -8.63595 17372 5306022002 TAKARAI NUSA TENGGARA TIMUR 146 Phase 3 40 28 120 6.1 124.89751 -9.48259 17373 5318070004 TENDATOTO NUSA TENGGARA TIMUR 9 Phase 3 2 1 698 0.4 121.49254 -8.63617 17374 5304011004 FATUMNASI NUSA TENGGARA TIMUR 20 Phase 3 6 4 218 0.9 124.21959 -9.64692 17375 5311012008 MUNDINGGASA NUSA TENGGARA TIMUR 473 Phase 3 88 74 712 16.1 121.49630 -8.64304 17376 5306050009 DEROK FATURENE NUSA TENGGARA TIMUR 155 Phase 3 35 24 605 5.3 124.90185 -9.19124 17377 5311012002 KAMUBHEKA NUSA TENGGARA TIMUR 1 011 Phase 3 211 179 139 38.7 121.48938 -8.66048 17378 5306050009 DEROK FATURENE NUSA TENGGARA TIMUR 389 Phase 3 86 60 458 13.0 124.90874 -9.20371 17379 5313140015 ROBEK NUSA TENGGARA TIMUR 101 Phase 3 26 22 074 4.8 120.40541 -8.28722 17380 5305012005 BISAFE NUSA TENGGARA TIMUR 32 Phase 3 11 7 733 1.7 124.40377 -9.45629 17381 5315030008 LALONG NUSA TENGGARA TIMUR 266 Phase 3 57 48 393 10.4 120.24428 -8.71830 17382 5305012005 BISAFE NUSA TENGGARA TIMUR 10 Phase 3 4 2 812 0.6 124.40104 -9.45699 17383 5312011006 MANUBHARA NUSA TENGGARA TIMUR 85 Phase 3 21 17 829 3.8 120.97308 -8.91978 17384 5305012005 BISAFE NUSA TENGGARA TIMUR 71 Phase 3 23 16 169 3.5 124.39929 -9.45690 17385 5312010001 WAEBELA NUSA TENGGARA TIMUR 87 Phase 3 22 18 678 4.0 120.98136 -8.92856 17386 5305012005 BISAFE NUSA TENGGARA TIMUR 168 Phase 3 54 37 962 8.2 124.39500 -9.45989 17387 5312010001 WAEBELA NUSA TENGGARA TIMUR 723 Phase 3 178 151 122 32.6 120.97365 -8.94275 17388 5304041006 HANE NUSA TENGGARA TIMUR 351 Phase 3 91 63 973 13.8 124.23398 -9.92300 17389 5310011003 BHERA NUSA TENGGARA TIMUR 130 Phase 3 35 29 715 6.4 122.04175 -8.69724 17390 5306050009 DEROK FATURENE NUSA TENGGARA TIMUR 206 Phase 3 46 32 338 7.0 124.91509 -9.21923 17391 5310011004 WOLODHESA NUSA TENGGARA TIMUR 92 Phase 3 24 20 376 4.4 122.05104 -8.69338 17392 5306050009 DEROK FATURENE NUSA TENGGARA TIMUR 356 Phase 3 79 55 537 12.0 124.93247 -9.21315 17393 5310011003 BHERA NUSA TENGGARA TIMUR 146 Phase 3 39 33 111 7.1 122.05190 -8.69571 17394 5306050009 DEROK FATURENE NUSA TENGGARA TIMUR 116 Phase 3 26 18 278 3.9 124.94561 -9.21456 Annex II – Demand forecast results Page 87 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 17395 5312011003 TIWORIWU NUSA TENGGARA TIMUR 180 Phase 3 39 33 111 7.1 120.98573 -8.87760 17396 5306050008 LOOKEU NUSA TENGGARA TIMUR 185 Phase 3 49 34 447 7.4 124.94784 -9.21303 17397 5312011003 TIWORIWU NUSA TENGGARA TIMUR 33 Phase 3 7 5 943 1.3 120.98455 -8.87518 17398 5306050008 LOOKEU NUSA TENGGARA TIMUR 115 Phase 3 30 21 090 4.6 124.94877 -9.21213 17399 5312011003 TIWORIWU NUSA TENGGARA TIMUR 94 Phase 3 20 16 980 3.7 120.98444 -8.87461 17400 5306050008 LOOKEU NUSA TENGGARA TIMUR 165 Phase 3 43 30 229 6.5 124.95111 -9.20660 17401 5315040013 MOMOL NUSA TENGGARA TIMUR 151 Phase 3 48 40 752 8.8 120.30920 -8.52269 17402 5304060009 LASI NUSA TENGGARA TIMUR 70 Phase 3 17 11 951 2.6 124.41765 -9.97883 17403 5315030006 SURUNUMBENG NUSA TENGGARA TIMUR 360 Phase 3 79 67 071 14.5 120.22816 -8.76518 17404 5303190010 KOLABE NUSA TENGGARA TIMUR 65 Phase 3 16 11 248 2.4 123.86813 -9.49320 17405 5319030003 PAAN WARU NUSA TENGGARA TIMUR 94 Phase 3 22 18 678 4.0 120.78645 -8.60864 17406 5303190010 KOLABE NUSA TENGGARA TIMUR 357 Phase 3 88 61 864 13.3 123.87262 -9.49699 17407 5319030009 TENO MESE NUSA TENGGARA TIMUR 186 Phase 3 37 31 413 6.8 120.79266 -8.60657 17408 5305050012 SAINIUP NUSA TENGGARA TIMUR 43 Phase 3 11 7 733 1.7 124.68163 -9.34707 17409 5319030009 TENO MESE NUSA TENGGARA TIMUR 93 Phase 3 19 16 131 3.5 120.78790 -8.60005 17410 5304081004 NUNUHAKNITI NUSA TENGGARA TIMUR 20 Phase 3 6 4 218 0.9 124.56076 -9.76367 17411 5319030009 TENO MESE NUSA TENGGARA TIMUR 196 Phase 3 39 33 111 7.1 120.78812 -8.59792 17412 5304080004 MAULEUM NUSA TENGGARA TIMUR 182 Phase 3 53 37 259 8.0 124.55652 -9.75407 17413 5319030008 GISING NUSA TENGGARA TIMUR 77 Phase 3 18 15 282 3.3 120.79950 -8.60203 17414 5304080004 MAULEUM NUSA TENGGARA TIMUR 215 Phase 3 63 44 289 9.6 124.55629 -9.74520 17415 5319030008 GISING NUSA TENGGARA TIMUR 156 Phase 3 36 30 564 6.6 120.80275 -8.59255 17416 5304080004 MAULEUM NUSA TENGGARA TIMUR 302 Phase 3 88 61 864 13.3 124.54914 -9.74785 17417 5319030008 GISING NUSA TENGGARA TIMUR 100 Phase 3 24 20 376 4.4 120.79980 -8.59070 17418 5303191006 SOLIU NUSA TENGGARA TIMUR 166 Phase 3 42 29 526 6.4 123.75256 -9.56656 17419 5319030008 GISING NUSA TENGGARA TIMUR 134 Phase 3 31 26 319 5.7 120.80823 -8.58825 17420 5304020005 BILOTO NUSA TENGGARA TIMUR 52 Phase 3 13 9 139 2.0 124.22685 -9.85291 17421 5319030008 GISING NUSA TENGGARA TIMUR 177 Phase 3 41 34 809 7.5 120.81366 -8.57844 17422 5303141001 PATHAU NUSA TENGGARA TIMUR 70 Phase 3 20 14 060 3.0 124.03205 -10.14689 17423 5319030007 GOLO LINUS NUSA TENGGARA TIMUR 761 Phase 3 142 120 558 26.0 120.80791 -8.55803 17424 5303141001 PATHAU NUSA TENGGARA TIMUR 14 Phase 3 4 2 812 0.6 124.03450 -10.15524 17425 5319030008 GISING NUSA TENGGARA TIMUR 190 Phase 3 44 37 356 8.1 120.80467 -8.60734 17426 5303141001 PATHAU NUSA TENGGARA TIMUR 186 Phase 3 53 37 259 8.0 124.03915 -10.15545 17427 5319030008 GISING NUSA TENGGARA TIMUR 127 Phase 3 30 25 470 5.5 120.81070 -8.60950 17428 5303141001 PATHAU NUSA TENGGARA TIMUR 39 Phase 3 11 7 733 1.7 124.04207 -10.15104 17429 5319030008 GISING NUSA TENGGARA TIMUR 150 Phase 3 35 29 715 6.4 120.81339 -8.60805 17430 5303141001 PATHAU NUSA TENGGARA TIMUR 249 Phase 3 70 49 210 10.6 124.04963 -10.15546 17431 5311052008 FATAMARI NUSA TENGGARA TIMUR 83 Phase 3 21 17 829 3.8 121.93328 -8.75237 17432 5303133003 RABEKA NUSA TENGGARA TIMUR 130 Phase 3 31 21 793 4.7 124.03728 -10.16206 17433 5315030003 NANGA LILI NUSA TENGGARA TIMUR 365 Phase 3 89 75 561 16.3 120.14908 -8.76462 17434 5303133003 RABEKA NUSA TENGGARA TIMUR 79 Phase 3 19 13 357 2.9 124.04367 -10.16742 17435 5312011003 TIWORIWU NUSA TENGGARA TIMUR 23 Phase 3 5 4 245 0.9 120.98571 -8.87475 17436 5303133003 RABEKA NUSA TENGGARA TIMUR 576 Phase 3 136 95 608 20.6 124.03788 -10.18722 17437 5312011003 TIWORIWU NUSA TENGGARA TIMUR 183 Phase 3 39 33 111 7.1 120.98626 -8.87317 17438 5303133003 RABEKA NUSA TENGGARA TIMUR 80 Phase 3 19 13 357 2.9 124.04670 -10.16611 17439 5319030006 SANGAN KALO NUSA TENGGARA TIMUR 84 Phase 3 19 16 131 3.5 120.81960 -8.57876 17440 5303133003 RABEKA NUSA TENGGARA TIMUR 13 Phase 3 4 2 812 0.6 124.06363 -10.16512 17441 5319030006 SANGAN KALO NUSA TENGGARA TIMUR 239 Phase 3 54 45 846 9.9 120.83104 -8.57909 17442 5303133003 RABEKA NUSA TENGGARA TIMUR 508 Phase 3 120 84 360 18.2 124.06726 -10.16477 17443 5319030006 SANGAN KALO NUSA TENGGARA TIMUR 126 Phase 3 29 24 621 5.3 120.83567 -8.58428 17444 5303141003 OEMOLO NUSA TENGGARA TIMUR 133 Phase 3 36 25 308 5.5 124.19716 -10.08850 17445 5319030006 SANGAN KALO NUSA TENGGARA TIMUR 123 Phase 3 28 23 772 5.1 120.83927 -8.58893 17446 5303141003 OEMOLO NUSA TENGGARA TIMUR 104 Phase 3 28 19 684 4.2 124.19483 -10.09651 17447 5319030006 SANGAN KALO NUSA TENGGARA TIMUR 117 Phase 3 27 22 923 4.9 120.84279 -8.58503 17448 5303141003 OEMOLO NUSA TENGGARA TIMUR 48 Phase 3 13 9 139 2.0 124.19276 -10.09589 17449 5319030006 SANGAN KALO NUSA TENGGARA TIMUR 1 108 Phase 3 249 211 401 45.6 120.85303 -8.59453 17450 5303141003 OEMOLO NUSA TENGGARA TIMUR 88 Phase 3 24 16 872 3.6 124.18986 -10.09507 17451 5319030008 GISING NUSA TENGGARA TIMUR 115 Phase 3 27 22 923 4.9 120.81187 -8.61135 17452 5303141003 OEMOLO NUSA TENGGARA TIMUR 55 Phase 3 15 10 545 2.3 124.18869 -10.09371 17453 5313140014 WANGKUNG NUSA TENGGARA TIMUR 63 Phase 3 14 11 886 2.6 120.46248 -8.29802 17454 5303141003 OEMOLO NUSA TENGGARA TIMUR 27 Phase 3 8 5 624 1.2 124.19644 -10.09814 17455 5319030012 TIWU KONDO NUSA TENGGARA TIMUR 51 Phase 3 12 10 188 2.2 120.78138 -8.53270 17456 5303133004 ENORAEN NUSA TENGGARA TIMUR 387 Phase 3 107 75 221 16.2 124.18679 -10.11532 17457 5319030012 TIWU KONDO NUSA TENGGARA TIMUR 118 Phase 3 28 23 772 5.1 120.78000 -8.53096 17458 5303133004 ENORAEN NUSA TENGGARA TIMUR 38 Phase 3 11 7 733 1.7 124.18423 -10.11934 17459 5319030012 TIWU KONDO NUSA TENGGARA TIMUR 352 Phase 3 82 69 618 15.0 120.77367 -8.52709 17460 5303133004 ENORAEN NUSA TENGGARA TIMUR 631 Phase 3 174 122 322 26.4 124.15351 -10.13641 17461 5319030012 TIWU KONDO NUSA TENGGARA TIMUR 85 Phase 3 20 16 980 3.7 120.76858 -8.52763 17462 5304051006 OEBAKI NUSA TENGGARA TIMUR 392 Phase 3 95 66 785 14.4 124.39774 -9.97083 17463 5319030012 TIWU KONDO NUSA TENGGARA TIMUR 87 Phase 3 21 17 829 3.8 120.76993 -8.52318 17464 5304051006 OEBAKI NUSA TENGGARA TIMUR 55 Phase 3 14 9 842 2.1 124.39649 -9.96119 17465 5319030012 TIWU KONDO NUSA TENGGARA TIMUR 100 Phase 3 24 20 376 4.4 120.76722 -8.51968 17466 5304051006 OEBAKI NUSA TENGGARA TIMUR 287 Phase 3 70 49 210 10.6 124.39584 -9.95474 17467 5319030012 TIWU KONDO NUSA TENGGARA TIMUR 34 Phase 3 8 6 792 1.5 120.77840 -8.51091 17468 5304051006 OEBAKI NUSA TENGGARA TIMUR 244 Phase 3 59 41 477 8.9 124.38080 -9.93340 17469 5319030018 BITING NUSA TENGGARA TIMUR 966 Phase 3 202 171 498 37.0 120.77362 -8.49506 17470 5304051006 OEBAKI NUSA TENGGARA TIMUR 358 Phase 3 87 61 161 13.2 124.37803 -9.93370 17471 5319030012 TIWU KONDO NUSA TENGGARA TIMUR 27 Phase 3 7 5 943 1.3 120.77900 -8.51165 17472 5304060010 OLAIS NUSA TENGGARA TIMUR 361 Phase 3 81 56 943 12.3 124.40681 -9.94159 17473 5311054005 KELISAMBA NUSA TENGGARA TIMUR 264 Phase 3 48 40 752 8.8 121.91507 -8.81801 17474 5304080012 BILLA NUSA TENGGARA TIMUR 81 Phase 3 25 17 575 3.8 124.57758 -9.67636 17475 5311020010 WOLOGAI NUSA TENGGARA TIMUR 75 Phase 3 18 15 282 3.3 121.64472 -8.68347 17476 5304080004 MAULEUM NUSA TENGGARA TIMUR 205 Phase 3 60 42 180 9.1 124.55494 -9.74104 17477 5311020010 WOLOGAI NUSA TENGGARA TIMUR 45 Phase 3 11 9 339 2.0 121.65154 -8.68416 17478 5304023005 OELEKAM NUSA TENGGARA TIMUR 78 Phase 3 21 14 763 3.2 124.29578 -9.80696 17479 5311020010 WOLOGAI NUSA TENGGARA TIMUR 223 Phase 3 52 44 148 9.5 121.65510 -8.68535 Annex II – Demand forecast results Page 88 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 17480 5304023005 OELEKAM NUSA TENGGARA TIMUR 227 Phase 3 59 41 477 8.9 124.30017 -9.80406 17481 5311020010 WOLOGAI NUSA TENGGARA TIMUR 228 Phase 3 54 45 846 9.9 121.66504 -8.69137 17482 5304023005 OELEKAM NUSA TENGGARA TIMUR 92 Phase 3 24 16 872 3.6 124.30550 -9.80748 17483 5311071015 NUMBA NUSA TENGGARA TIMUR 383 Phase 3 77 65 373 14.1 121.68940 -8.68927 17484 5304023005 OELEKAM NUSA TENGGARA TIMUR 39 Phase 3 11 7 733 1.7 124.30143 -9.81265 17485 5311070022 GOLULADA NUSA TENGGARA TIMUR 137 Phase 3 37 31 413 6.8 121.70082 -8.70038 17486 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 104 Phase 3 29 20 387 4.4 124.30070 -9.81973 17487 5311070022 GOLULADA NUSA TENGGARA TIMUR 77 Phase 3 21 17 829 3.8 121.70169 -8.69969 17488 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 15 Phase 3 5 3 515 0.8 124.30197 -9.82241 17489 5311070022 GOLULADA NUSA TENGGARA TIMUR 366 Phase 3 98 83 202 18.0 121.70728 -8.70457 17490 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 322 Phase 3 88 61 864 13.3 124.30525 -9.81957 17491 5311071007 WEWARIA NUSA TENGGARA TIMUR 780 Phase 3 182 154 518 33.3 121.68540 -8.52627 17492 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 126 Phase 3 35 24 605 5.3 124.31106 -9.81837 17493 5319030008 GISING NUSA TENGGARA TIMUR 118 Phase 3 28 23 772 5.1 120.81325 -8.61270 17494 5306020004 KATERI NUSA TENGGARA TIMUR 78 Phase 3 23 16 169 3.5 124.84617 -9.52680 17495 5315011005 SEPANG NUSA TENGGARA TIMUR 134 Phase 3 32 27 168 5.9 120.07793 -8.47715 17496 5304080006 OE EKAM NUSA TENGGARA TIMUR 221 Phase 3 50 35 150 7.6 124.58514 -9.69762 17497 5318030013 UTETOTO NUSA TENGGARA TIMUR 248 Phase 3 58 49 242 10.6 121.39689 -8.69708 17498 5305042002 LAPEOM NUSA TENGGARA TIMUR 112 Phase 3 29 20 387 4.4 124.54526 -9.50109 17499 5311010009 TENDAREA NUSA TENGGARA TIMUR 177 Phase 3 45 38 205 8.2 121.44376 -8.75246 17500 5305042002 LAPEOM NUSA TENGGARA TIMUR 116 Phase 3 30 21 090 4.6 124.54266 -9.49851 17501 5312081006 RIA I NUSA TENGGARA TIMUR 505 Phase 3 133 112 917 24.4 120.95538 -8.47760 17502 5305042002 LAPEOM NUSA TENGGARA TIMUR 83 Phase 3 22 15 466 3.3 124.53840 -9.49739 17503 5315020009 NAMPAR MACING NUSA TENGGARA TIMUR 139 Phase 3 37 31 413 6.8 120.05628 -8.64950 17504 5305042002 LAPEOM NUSA TENGGARA TIMUR 63 Phase 3 17 11 951 2.6 124.53523 -9.49759 17505 5315020009 NAMPAR MACING NUSA TENGGARA TIMUR 184 Phase 3 48 40 752 8.8 120.05897 -8.65781 17506 5303191005 OELFATU NUSA TENGGARA TIMUR 176 Phase 3 43 30 229 6.5 123.75062 -9.56969 17507 5312070020 NABELENA NUSA TENGGARA TIMUR 65 Phase 3 13 11 037 2.4 121.00178 -8.70350 17508 5306041004 ALAS UTARA NUSA TENGGARA TIMUR 42 Phase 3 12 8 436 1.8 125.01811 -9.35279 17509 5311010018 JEGHARANGGA NUSA TENGGARA TIMUR 56 Phase 3 15 12 735 2.7 121.55033 -8.76742 17510 5304020008 KESETNANA NUSA TENGGARA TIMUR 662 Phase 3 158 111 074 24.0 124.24718 -9.84721 17511 5319030008 GISING NUSA TENGGARA TIMUR 157 Phase 3 37 31 413 6.8 120.81517 -8.61414 17512 5306030014 WEMEDA NUSA TENGGARA TIMUR 70 Phase 3 16 11 248 2.4 124.90314 -9.43098 17513 5319060009 GOLO LEMBUR NUSA TENGGARA TIMUR 255 Phase 3 58 49 242 10.6 120.61960 -8.43425 17514 5306030014 WEMEDA NUSA TENGGARA TIMUR 266 Phase 3 60 42 180 9.1 124.90834 -9.43415 17515 5319030012 TIWU KONDO NUSA TENGGARA TIMUR 110 Phase 3 26 22 074 4.8 120.78583 -8.51361 17516 5303160005 CAMPLONG II NUSA TENGGARA TIMUR 123 Phase 3 35 24 605 5.3 123.91306 -9.99173 17517 5319030012 TIWU KONDO NUSA TENGGARA TIMUR 75 Phase 3 18 15 282 3.3 120.78839 -8.51280 17518 5303160005 CAMPLONG II NUSA TENGGARA TIMUR 172 Phase 3 49 34 447 7.4 123.91811 -9.99192 17519 5311010001 ONDOREA NUSA TENGGARA TIMUR 222 Phase 3 56 47 544 10.3 121.45721 -8.78492 17520 5306070001 FATUBA'A NUSA TENGGARA TIMUR 184 Phase 3 50 35 150 7.6 124.95374 -9.17477 17521 5313140003 LANTE NUSA TENGGARA TIMUR 331 Phase 3 85 72 165 15.6 120.33761 -8.42546 17522 5306070001 FATUBA'A NUSA TENGGARA TIMUR 59 Phase 3 16 11 248 2.4 124.94224 -9.16090 17523 5319010002 SATAR LAHING NUSA TENGGARA TIMUR 166 Phase 3 31 26 319 5.7 120.54168 -8.74441 17524 5306070001 FATUBA'A NUSA TENGGARA TIMUR 440 Phase 3 119 83 657 18.1 124.93356 -9.16329 17525 5315020008 GOLO KEMPO NUSA TENGGARA TIMUR 150 Phase 3 36 30 564 6.6 120.04821 -8.65198 17526 5306050004 LAWALUTOLUS NUSA TENGGARA TIMUR 56 Phase 3 14 9 842 2.1 124.91651 -9.29131 17527 5315020008 GOLO KEMPO NUSA TENGGARA TIMUR 4 Phase 3 1 849 0.2 120.04734 -8.65401 17528 5306050004 LAWALUTOLUS NUSA TENGGARA TIMUR 136 Phase 3 32 22 496 4.9 124.91657 -9.29321 17529 5315020008 GOLO KEMPO NUSA TENGGARA TIMUR 318 Phase 3 76 64 524 13.9 120.03978 -8.64995 17530 5306050004 LAWALUTOLUS NUSA TENGGARA TIMUR 52 Phase 3 13 9 139 2.0 124.91505 -9.29398 17531 5315020005 GOLO MBU NUSA TENGGARA TIMUR 92 Phase 3 25 21 225 4.6 120.04131 -8.64510 17532 5306020016 RAILOR TAHAK NUSA TENGGARA TIMUR 22 Phase 3 7 4 921 1.1 124.96562 -9.60063 17533 5315020009 NAMPAR MACING NUSA TENGGARA TIMUR 38 Phase 3 10 8 490 1.8 120.04763 -8.65463 17534 5306020016 RAILOR TAHAK NUSA TENGGARA TIMUR 118 Phase 3 33 23 199 5.0 124.96475 -9.60316 17535 5313041002 SATAR RUWUK NUSA TENGGARA TIMUR 227 Phase 3 50 42 450 9.2 120.27574 -8.84981 17536 5304101012 MEUSIN NUSA TENGGARA TIMUR 125 Phase 3 24 16 872 3.6 124.75750 -9.79964 17537 5313041003 NUCA MOLAS NUSA TENGGARA TIMUR 283 Phase 3 66 56 034 12.1 120.28795 -8.86913 17538 5304101013 BAUS NUSA TENGGARA TIMUR 106 Phase 3 32 22 496 4.9 124.75287 -9.80082 17539 5313041003 NUCA MOLAS NUSA TENGGARA TIMUR 90 Phase 3 21 17 829 3.8 120.29577 -8.87270 17540 5303191005 OELFATU NUSA TENGGARA TIMUR 143 Phase 3 35 24 605 5.3 123.74928 -9.57274 17541 5313041003 NUCA MOLAS NUSA TENGGARA TIMUR 734 Phase 3 171 145 179 31.3 120.30408 -8.89252 17542 5304072006 OENINO NUSA TENGGARA TIMUR 735 Phase 3 180 126 540 27.3 124.45317 -9.72712 17543 5315030004 REPI NUSA TENGGARA TIMUR 310 Phase 3 59 50 091 10.8 120.21404 -8.79847 17544 5304041006 HANE NUSA TENGGARA TIMUR 298 Phase 3 77 54 131 11.7 124.24343 -9.93091 17545 5315030004 REPI NUSA TENGGARA TIMUR 367 Phase 3 69 58 581 12.6 120.22578 -8.80561 17546 5306080008 DIRUN NUSA TENGGARA TIMUR 121 Phase 3 28 19 684 4.2 125.11211 -9.09323 17547 5319030008 GISING NUSA TENGGARA TIMUR 85 Phase 3 20 16 980 3.7 120.81746 -8.61500 17548 5304082003 TAEBONE NUSA TENGGARA TIMUR 162 Phase 3 50 35 150 7.6 124.65025 -9.66338 17549 5319030005 LANGGASAI NUSA TENGGARA TIMUR 61 Phase 3 21 17 829 3.8 120.81996 -8.61524 17550 5306052001 DUBESI NUSA TENGGARA TIMUR 111 Phase 3 27 18 981 4.1 124.92643 -9.30012 17551 5319060008 GOLO RENTUNG NUSA TENGGARA TIMUR 60 Phase 3 17 14 433 3.1 120.58604 -8.43539 17552 5306052001 DUBESI NUSA TENGGARA TIMUR 9 Phase 3 3 2 109 0.5 124.92829 -9.30104 17553 5319060008 GOLO RENTUNG NUSA TENGGARA TIMUR 226 Phase 3 61 51 789 11.2 120.58583 -8.42997 17554 5306052001 DUBESI NUSA TENGGARA TIMUR 158 Phase 3 38 26 714 5.8 124.92956 -9.30130 17555 5319060008 GOLO RENTUNG NUSA TENGGARA TIMUR 111 Phase 3 30 25 470 5.5 120.58611 -8.42588 17556 5306052001 DUBESI NUSA TENGGARA TIMUR 136 Phase 3 33 23 199 5.0 124.93418 -9.29960 17557 5318060009 LABOLEWA NUSA TENGGARA TIMUR 170 Phase 3 34 28 866 6.2 121.31067 -8.69029 17558 5303141002 MUKE NUSA TENGGARA TIMUR 22 Phase 3 6 4 218 0.9 124.09422 -10.10232 17559 5318050005 RENDU BUTOWE NUSA TENGGARA TIMUR 298 Phase 3 73 61 977 13.4 121.28325 -8.70345 17560 5303141002 MUKE NUSA TENGGARA TIMUR 343 Phase 3 91 63 973 13.8 124.09120 -10.10461 17561 5318050005 RENDU BUTOWE NUSA TENGGARA TIMUR 409 Phase 3 100 84 900 18.3 121.28122 -8.70722 17562 5304090014 FALLAS NUSA TENGGARA TIMUR 263 Phase 3 70 49 210 10.6 124.50116 -9.82807 17563 5318050005 RENDU BUTOWE NUSA TENGGARA TIMUR 150 Phase 3 37 31 413 6.8 121.26692 -8.71266 17564 5304070020 BONE NUSA TENGGARA TIMUR 225 Phase 3 55 38 665 8.3 124.46365 -9.81318 Annex II – Demand forecast results Page 89 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 17565 5318050005 RENDU BUTOWE NUSA TENGGARA TIMUR 162 Phase 3 40 33 960 7.3 121.26511 -8.71063 17566 5304042004 ENONEONTES NUSA TENGGARA TIMUR 112 Phase 3 26 18 278 3.9 124.32827 -9.83197 17567 5318050004 RENDUWAWO NUSA TENGGARA TIMUR 74 Phase 3 16 13 584 2.9 121.24781 -8.69673 17568 5304042006 OOF NUSA TENGGARA TIMUR 42 Phase 3 9 6 327 1.4 124.33137 -9.82681 17569 5318050004 RENDUWAWO NUSA TENGGARA TIMUR 385 Phase 3 82 69 618 15.0 121.24755 -8.69575 17570 5304042006 OOF NUSA TENGGARA TIMUR 61 Phase 3 13 9 139 2.0 124.33305 -9.82426 17571 5318050004 RENDUWAWO NUSA TENGGARA TIMUR 223 Phase 3 48 40 752 8.8 121.24496 -8.68927 17572 5304042006 OOF NUSA TENGGARA TIMUR 55 Phase 3 12 8 436 1.8 124.33062 -9.81887 17573 5311010008 KERIREA NUSA TENGGARA TIMUR 189 Phase 3 46 39 054 8.4 121.47577 -8.72875 17574 5304042006 OOF NUSA TENGGARA TIMUR 77 Phase 3 17 11 951 2.6 124.32942 -9.81883 17575 5319030005 LANGGASAI NUSA TENGGARA TIMUR 216 Phase 3 74 62 826 13.6 120.82426 -8.61377 17576 5304042006 OOF NUSA TENGGARA TIMUR 27 Phase 3 6 4 218 0.9 124.33310 -9.81715 17577 5319030005 LANGGASAI NUSA TENGGARA TIMUR 231 Phase 3 79 67 071 14.5 120.83394 -8.61534 17578 5304042006 OOF NUSA TENGGARA TIMUR 24 Phase 3 6 4 218 0.9 124.33439 -9.81598 17579 5319030005 LANGGASAI NUSA TENGGARA TIMUR 159 Phase 3 55 46 695 10.1 120.83958 -8.61073 17580 5304042006 OOF NUSA TENGGARA TIMUR 161 Phase 3 34 23 902 5.2 124.33524 -9.81044 17581 5310012014 RENGGARASI NUSA TENGGARA TIMUR 42 Phase 3 9 7 641 1.6 121.98257 -8.72744 17582 5304042006 OOF NUSA TENGGARA TIMUR 49 Phase 3 11 7 733 1.7 124.33555 -9.80660 17583 5315020013 WATU WANGKA NUSA TENGGARA TIMUR 149 Phase 3 36 30 564 6.6 120.07669 -8.59897 17584 5304042006 OOF NUSA TENGGARA TIMUR 112 Phase 3 24 16 872 3.6 124.33400 -9.80554 17585 5315020013 WATU WANGKA NUSA TENGGARA TIMUR 68 Phase 3 17 14 433 3.1 120.07908 -8.59671 17586 5304042006 OOF NUSA TENGGARA TIMUR 35 Phase 3 8 5 624 1.2 124.33551 -9.80456 17587 5311060016 RANOKOLO SELATAN NUSA TENGGARA TIMUR 218 Phase 3 48 40 752 8.8 121.75275 -8.56943 17588 5304023006 PIKA NUSA TENGGARA TIMUR 21 Phase 3 6 4 218 0.9 124.33505 -9.80319 17589 5311071010 FATAATU TIMUR NUSA TENGGARA TIMUR 247 Phase 3 61 51 789 11.2 121.75798 -8.58083 17590 5304023006 PIKA NUSA TENGGARA TIMUR 75 Phase 3 18 12 654 2.7 124.33859 -9.80016 17591 5311071017 AELIPO NUSA TENGGARA TIMUR 142 Phase 3 36 30 564 6.6 121.76384 -8.57687 17592 5304023006 PIKA NUSA TENGGARA TIMUR 76 Phase 3 19 13 357 2.9 124.34031 -9.79785 17593 5311071010 FATAATU TIMUR NUSA TENGGARA TIMUR 217 Phase 3 54 45 846 9.9 121.77222 -8.58219 17594 5304023006 PIKA NUSA TENGGARA TIMUR 62 Phase 3 15 10 545 2.3 124.34323 -9.79601 17595 5318060023 AERAMO NUSA TENGGARA TIMUR 198 Phase 3 36 30 564 6.6 121.33489 -8.57411 17596 5304042006 OOF NUSA TENGGARA TIMUR 77 Phase 3 17 11 951 2.6 124.34859 -9.79657 17597 5319060002 COMPANG NECAK NUSA TENGGARA TIMUR 8 Phase 3 3 2 547 0.5 120.62495 -8.49005 17598 5304042006 OOF NUSA TENGGARA TIMUR 165 Phase 3 35 24 605 5.3 124.35092 -9.79733 17599 5319060002 COMPANG NECAK NUSA TENGGARA TIMUR 98 Phase 3 27 22 923 4.9 120.62536 -8.48928 17600 5304042006 OOF NUSA TENGGARA TIMUR 300 Phase 3 64 44 992 9.7 124.35405 -9.79477 17601 5315011006 GOLO SEPANG NUSA TENGGARA TIMUR 923 Phase 3 194 164 706 35.5 120.06918 -8.42527 17602 5304042006 OOF NUSA TENGGARA TIMUR 92 Phase 3 20 14 060 3.0 124.35724 -9.79315 17603 5319050024 COMPANG WUNIS NUSA TENGGARA TIMUR 75 Phase 3 21 17 829 3.8 120.66111 -8.50412 17604 5304042006 OOF NUSA TENGGARA TIMUR 236 Phase 3 50 35 150 7.6 124.35180 -9.79955 17605 5311061014 RANGALAKA NUSA TENGGARA TIMUR 227 Phase 3 51 43 299 9.3 121.92288 -8.56573 17606 5306010027 MOTAULUN NUSA TENGGARA TIMUR 163 Phase 3 49 34 447 7.4 124.90639 -9.63194 17607 5315031009 DUNTA NUSA TENGGARA TIMUR 162 Phase 3 42 35 658 7.7 120.21776 -8.59275 17608 5305025001 FAENNAKE NUSA TENGGARA TIMUR 93 Phase 3 25 17 575 3.8 124.42770 -9.38507 17609 5319020005 WATU NGGENE NUSA TENGGARA TIMUR 233 Phase 3 49 41 601 9.0 120.79251 -8.83557 17610 5305025001 FAENNAKE NUSA TENGGARA TIMUR 199 Phase 3 52 36 556 7.9 124.42992 -9.38539 17611 5313140019 PARA LANDO NUSA TENGGARA TIMUR 156 Phase 3 39 33 111 7.1 120.34540 -8.28879 17612 5304090013 NAPI NUSA TENGGARA TIMUR 32 Phase 3 9 6 327 1.4 124.53243 -9.83218 17613 5313140019 PARA LANDO NUSA TENGGARA TIMUR 112 Phase 3 28 23 772 5.1 120.34275 -8.29637 17614 5304090014 FALLAS NUSA TENGGARA TIMUR 344 Phase 3 91 63 973 13.8 124.52063 -9.82412 17615 5313140020 LEMARANG NUSA TENGGARA TIMUR 608 Phase 3 127 107 823 23.3 120.33509 -8.29059 17616 5304090013 NAPI NUSA TENGGARA TIMUR 125 Phase 3 34 23 902 5.2 124.53683 -9.82825 17617 5319060008 GOLO RENTUNG NUSA TENGGARA TIMUR 62 Phase 3 17 14 433 3.1 120.58108 -8.43439 17618 5304090013 NAPI NUSA TENGGARA TIMUR 48 Phase 3 14 9 842 2.1 124.53903 -9.82510 17619 5319060008 GOLO RENTUNG NUSA TENGGARA TIMUR 92 Phase 3 25 21 225 4.6 120.56856 -8.43395 17620 5304090013 NAPI NUSA TENGGARA TIMUR 138 Phase 3 38 26 714 5.8 124.54137 -9.82046 17621 5319060005 COMPANG DERU NUSA TENGGARA TIMUR 66 Phase 3 16 13 584 2.9 120.56668 -8.43902 17622 5303191006 SOLIU NUSA TENGGARA TIMUR 539 Phase 3 136 95 608 20.6 123.73438 -9.58098 17623 5319060005 COMPANG DERU NUSA TENGGARA TIMUR 125 Phase 3 29 24 621 5.3 120.56193 -8.43941 17624 5306020004 KATERI NUSA TENGGARA TIMUR 169 Phase 3 48 33 744 7.3 124.85208 -9.52218 17625 5319060005 COMPANG DERU NUSA TENGGARA TIMUR 343 Phase 3 79 67 071 14.5 120.55858 -8.44100 17626 5304060009 LASI NUSA TENGGARA TIMUR 51 Phase 3 13 9 139 2.0 124.45254 -9.97511 17627 5319060006 GORENG MENI NUSA TENGGARA TIMUR 136 Phase 3 47 39 903 8.6 120.55208 -8.44166 17628 5303100006 OTAN NUSA TENGGARA TIMUR 111 Phase 3 27 18 981 4.1 123.40371 -10.17771 17629 5319060006 GORENG MENI NUSA TENGGARA TIMUR 226 Phase 3 78 66 222 14.3 120.54957 -8.45116 17630 5303100006 OTAN NUSA TENGGARA TIMUR 308 Phase 3 74 52 022 11.2 123.39097 -10.17359 17631 5319060006 GORENG MENI NUSA TENGGARA TIMUR 121 Phase 3 42 35 658 7.7 120.55007 -8.45429 17632 5303100006 OTAN NUSA TENGGARA TIMUR 103 Phase 3 25 17 575 3.8 123.39155 -10.17127 17633 5319060006 GORENG MENI NUSA TENGGARA TIMUR 444 Phase 3 153 129 897 28.0 120.54961 -8.45750 17634 5303100006 OTAN NUSA TENGGARA TIMUR 231 Phase 3 56 39 368 8.5 123.38881 -10.16923 17635 5319060006 GORENG MENI NUSA TENGGARA TIMUR 128 Phase 3 44 37 356 8.1 120.54870 -8.43277 17636 5303111009 TUNFEU NUSA TENGGARA TIMUR 98 Phase 3 26 18 278 3.9 123.65434 -10.23552 17637 5319060016 SATAR PUNDA NUSA TENGGARA TIMUR 15 Phase 3 7 5 943 1.3 120.48563 -8.33049 17638 5303111009 TUNFEU NUSA TENGGARA TIMUR 113 Phase 3 30 21 090 4.6 123.65533 -10.23152 17639 5303111009 TUNFEU NUSA TENGGARA TIMUR 89 Phase 3 24 16 872 3.6 123.65956 -10.23128 17640 5313140011 SALAMA NUSA TENGGARA TIMUR 232 Phase 3 60 50 940 11.0 120.48101 -8.34419 17641 5306070009 SARABAU NUSA TENGGARA TIMUR 75 Phase 3 24 16 872 3.6 124.99159 -9.07149 17642 5313140008 BAJAK NUSA TENGGARA TIMUR 133 Phase 3 29 24 621 5.3 120.48086 -8.34926 17643 5304104004 MANUFUI NUSA TENGGARA TIMUR 177 Phase 3 45 31 635 6.8 124.73627 -9.77223 17644 5319060015 LIANG DERUK NUSA TENGGARA TIMUR 109 Phase 3 32 27 168 5.9 120.48294 -8.36100 17645 5304080005 OELET NUSA TENGGARA TIMUR 131 Phase 3 35 24 605 5.3 124.53334 -9.71284 17646 5313140008 BAJAK NUSA TENGGARA TIMUR 484 Phase 3 104 88 296 19.1 120.47540 -8.36246 17647 5303150006 PANTULAN NUSA TENGGARA TIMUR 159 Phase 3 34 23 902 5.2 123.59987 -9.98538 17648 5319060015 LIANG DERUK NUSA TENGGARA TIMUR 118 Phase 3 35 29 715 6.4 120.49221 -8.35996 17649 5303150006 PANTULAN NUSA TENGGARA TIMUR 40 Phase 3 9 6 327 1.4 123.59775 -9.95802 Annex II – Demand forecast results Page 90 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 17650 5319060015 LIANG DERUK NUSA TENGGARA TIMUR 167 Phase 3 49 41 601 9.0 120.49808 -8.36448 17651 5303150006 PANTULAN NUSA TENGGARA TIMUR 603 Phase 3 129 90 687 19.6 123.59798 -9.95519 17652 5319060015 LIANG DERUK NUSA TENGGARA TIMUR 66 Phase 3 20 16 980 3.7 120.49856 -8.36650 17653 5303162002 POTO NUSA TENGGARA TIMUR 47 Phase 3 11 7 733 1.7 123.59614 -9.94117 17654 5319060015 LIANG DERUK NUSA TENGGARA TIMUR 86 Phase 3 25 21 225 4.6 120.51607 -8.36575 17655 5303162002 POTO NUSA TENGGARA TIMUR 275 Phase 3 64 44 992 9.7 123.59366 -9.93756 17656 5319060014 NAMPAR TABANG NUSA TENGGARA TIMUR 356 Phase 3 79 67 071 14.5 120.52803 -8.36779 17657 5303162002 POTO NUSA TENGGARA TIMUR 247 Phase 3 57 40 071 8.6 123.59931 -9.93365 17658 5319060014 NAMPAR TABANG NUSA TENGGARA TIMUR 101 Phase 3 23 19 527 4.2 120.52940 -8.36652 17659 5303150006 PANTULAN NUSA TENGGARA TIMUR 313 Phase 3 67 47 101 10.2 123.58720 -9.94359 17660 5319060014 NAMPAR TABANG NUSA TENGGARA TIMUR 572 Phase 3 127 107 823 23.3 120.52882 -8.36232 17661 5303170006 OELNAINENO NUSA TENGGARA TIMUR 120 Phase 3 28 19 684 4.2 123.97702 -9.84226 17662 5313140008 BAJAK NUSA TENGGARA TIMUR 65 Phase 3 14 11 886 2.6 120.47301 -8.36383 17663 5303170006 OELNAINENO NUSA TENGGARA TIMUR 50 Phase 3 12 8 436 1.8 123.97858 -9.84047 17664 5311061008 NIOPANDA NUSA TENGGARA TIMUR 234 Phase 3 58 49 242 10.6 121.90452 -8.55233 17665 5306070001 FATUBA'A NUSA TENGGARA TIMUR 206 Phase 3 56 39 368 8.5 124.95044 -9.18720 17666 5311061008 NIOPANDA NUSA TENGGARA TIMUR 328 Phase 3 81 68 769 14.8 121.90418 -8.55116 17667 5304110010 FATUONI NUSA TENGGARA TIMUR 72 Phase 3 22 15 466 3.3 124.71329 -9.65582 17668 5312082004 NGINAMANU NUSA TENGGARA TIMUR 375 Phase 3 73 61 977 13.4 121.04002 -8.64588 17669 5304070018 NOBI NOBI NUSA TENGGARA TIMUR 66 Phase 3 15 10 545 2.3 124.44839 -9.82585 17670 5319010008 NGAMPANG MAS NUSA TENGGARA TIMUR 48 Phase 3 10 8 490 1.8 120.66096 -8.70899 17671 5304070018 NOBI NOBI NUSA TENGGARA TIMUR 176 Phase 3 39 27 417 5.9 124.44754 -9.82448 17672 5319010008 NGAMPANG MAS NUSA TENGGARA TIMUR 91 Phase 3 18 15 282 3.3 120.65957 -8.71134 17673 5304050019 ENO NETTEN NUSA TENGGARA TIMUR 373 Phase 3 101 71 003 15.3 124.24205 -9.94489 17674 5319010008 NGAMPANG MAS NUSA TENGGARA TIMUR 123 Phase 3 25 21 225 4.6 120.65979 -8.71462 17675 5303170006 OELNAINENO NUSA TENGGARA TIMUR 21 Phase 3 5 3 515 0.8 123.97493 -9.84018 17676 5312070020 NABELENA NUSA TENGGARA TIMUR 48 Phase 3 10 8 490 1.8 121.00032 -8.69963 17677 5303170006 OELNAINENO NUSA TENGGARA TIMUR 321 Phase 3 75 52 725 11.4 123.96352 -9.84915 17678 5312070020 NABELENA NUSA TENGGARA TIMUR 58 Phase 3 12 10 188 2.2 120.99965 -8.69891 17679 5303170006 OELNAINENO NUSA TENGGARA TIMUR 64 Phase 3 15 10 545 2.3 123.96473 -9.85245 17680 5310011005 GERA NUSA TENGGARA TIMUR 165 Phase 3 44 37 356 8.1 122.08278 -8.65166 17681 5303170004 HUEKNUTU NUSA TENGGARA TIMUR 98 Phase 3 25 17 575 3.8 123.96866 -9.85458 17682 5310011003 BHERA NUSA TENGGARA TIMUR 89 Phase 3 24 20 376 4.4 122.05701 -8.69824 17683 5303170004 HUEKNUTU NUSA TENGGARA TIMUR 183 Phase 3 45 31 635 6.8 123.97341 -9.85687 17684 5318030007 WOKODEKORORO NUSA TENGGARA TIMUR 263 Phase 3 55 46 695 10.1 121.33276 -8.82145 17685 5303190008 NAIKLIU NUSA TENGGARA TIMUR 196 Phase 3 43 30 229 6.5 123.84000 -9.50179 17686 5315010011 GOLO BILAS NUSA TENGGARA TIMUR 218 Phase 3 54 45 846 9.9 119.88189 -8.55044 17687 5304080005 OELET NUSA TENGGARA TIMUR 126 Phase 3 33 23 199 5.0 124.53371 -9.72290 17688 5315010008 MACANG TANGGAR NUSA TENGGARA TIMUR 470 Phase 3 106 89 994 19.4 119.87056 -8.55027 17689 5304080005 OELET NUSA TENGGARA TIMUR 27 Phase 3 8 5 624 1.2 124.52471 -9.71974 17690 5313040009 TAL NUSA TENGGARA TIMUR 28 Phase 3 7 5 943 1.3 120.39557 -8.78887 17691 5304080005 OELET NUSA TENGGARA TIMUR 237 Phase 3 62 43 586 9.4 124.51994 -9.72733 17692 5313040009 TAL NUSA TENGGARA TIMUR 231 Phase 3 51 43 299 9.3 120.40209 -8.78327 17693 5304080005 OELET NUSA TENGGARA TIMUR 57 Phase 3 15 10 545 2.3 124.51800 -9.71655 17694 5315020020 GOLO DAMU NUSA TENGGARA TIMUR 66 Phase 3 16 13 584 2.9 120.02732 -8.59751 17695 5304072007 ABI NUSA TENGGARA TIMUR 357 Phase 3 106 74 518 16.1 124.50816 -9.71343 17696 5315020020 GOLO DAMU NUSA TENGGARA TIMUR 134 Phase 3 31 26 319 5.7 120.02656 -8.59631 17697 5305050010 TOKBESI NUSA TENGGARA TIMUR 90 Phase 3 22 15 466 3.3 124.71607 -9.33914 17698 5315020016 CUNCA LOLOS NUSA TENGGARA TIMUR 501 Phase 3 140 118 860 25.6 120.01807 -8.59449 17699 5305050010 TOKBESI NUSA TENGGARA TIMUR 35 Phase 3 9 6 327 1.4 124.71930 -9.33957 17700 5319060001 TENGKULAWAR NUSA TENGGARA TIMUR 38 Phase 3 13 11 037 2.4 120.57077 -8.46415 17701 5305050010 TOKBESI NUSA TENGGARA TIMUR 24 Phase 3 6 4 218 0.9 124.73106 -9.32842 17702 5319060001 TENGKULAWAR NUSA TENGGARA TIMUR 71 Phase 3 24 20 376 4.4 120.55866 -8.47294 17703 5305050010 TOKBESI NUSA TENGGARA TIMUR 46 Phase 3 11 7 733 1.7 124.73179 -9.32780 17704 5319060001 TENGKULAWAR NUSA TENGGARA TIMUR 208 Phase 3 71 60 279 13.0 120.55416 -8.47516 17705 5305050007 TAUTPAH NUSA TENGGARA TIMUR 46 Phase 3 13 9 139 2.0 124.73428 -9.32309 17706 5315020019 WAE LOLOS NUSA TENGGARA TIMUR 114 Phase 3 27 22 923 4.9 120.02105 -8.60938 17707 5305050007 TAUTPAH NUSA TENGGARA TIMUR 208 Phase 3 59 41 477 8.9 124.73551 -9.31595 17708 5315020019 WAE LOLOS NUSA TENGGARA TIMUR 137 Phase 3 32 27 168 5.9 120.01102 -8.61983 17709 5305050007 TAUTPAH NUSA TENGGARA TIMUR 84 Phase 3 24 16 872 3.6 124.73839 -9.31369 17710 5315020019 WAE LOLOS NUSA TENGGARA TIMUR 176 Phase 3 41 34 809 7.5 120.01075 -8.63079 17711 5305050007 TAUTPAH NUSA TENGGARA TIMUR 105 Phase 3 30 21 090 4.6 124.74267 -9.31243 17712 5315020005 GOLO MBU NUSA TENGGARA TIMUR 290 Phase 3 79 67 071 14.5 120.01321 -8.63652 17713 5305050007 TAUTPAH NUSA TENGGARA TIMUR 37 Phase 3 11 7 733 1.7 124.74868 -9.30919 17714 5315020007 GOLO NDARING NUSA TENGGARA TIMUR 148 Phase 3 32 27 168 5.9 120.00493 -8.63375 17715 5305050007 TAUTPAH NUSA TENGGARA TIMUR 12 Phase 3 4 2 812 0.6 124.74981 -9.30829 17716 5315020007 GOLO NDARING NUSA TENGGARA TIMUR 427 Phase 3 91 77 259 16.7 120.00125 -8.64502 17717 5305050007 TAUTPAH NUSA TENGGARA TIMUR 59 Phase 3 17 11 951 2.6 124.75082 -9.30821 17718 5315020005 GOLO MBU NUSA TENGGARA TIMUR 865 Phase 3 234 198 666 42.9 120.01110 -8.64853 17719 5305050007 TAUTPAH NUSA TENGGARA TIMUR 50 Phase 3 15 10 545 2.3 124.75418 -9.30833 17720 5315020005 GOLO MBU NUSA TENGGARA TIMUR 123 Phase 3 34 28 866 6.2 120.01132 -8.65003 17721 5305050007 TAUTPAH NUSA TENGGARA TIMUR 35 Phase 3 10 7 030 1.5 124.75696 -9.30820 17722 5315020005 GOLO MBU NUSA TENGGARA TIMUR 89 Phase 3 25 21 225 4.6 120.01247 -8.65086 17723 5305060004 SAPAEN NUSA TENGGARA TIMUR 70 Phase 3 16 11 248 2.4 124.76082 -9.30813 17724 5315020005 GOLO MBU NUSA TENGGARA TIMUR 120 Phase 3 33 28 017 6.0 120.01260 -8.65238 17725 5305060004 SAPAEN NUSA TENGGARA TIMUR 609 Phase 3 138 97 014 20.9 124.76971 -9.30454 17726 5319030010 GOLO MUNDE NUSA TENGGARA TIMUR 172 Phase 3 37 31 413 6.8 120.78904 -8.53083 17727 5305060004 SAPAEN NUSA TENGGARA TIMUR 15 Phase 3 4 2 812 0.6 124.77540 -9.30218 17728 5311041004 ROGA NUSA TENGGARA TIMUR 88 Phase 3 28 23 772 5.1 121.78858 -8.80388 17729 5305060005 TAUNBAEN NUSA TENGGARA TIMUR 250 Phase 3 66 46 398 10.0 124.77788 -9.29983 17730 5319030010 GOLO MUNDE NUSA TENGGARA TIMUR 227 Phase 3 49 41 601 9.0 120.80246 -8.52796 17731 5305060005 TAUNBAEN NUSA TENGGARA TIMUR 337 Phase 3 89 62 567 13.5 124.78428 -9.29456 17732 5319030010 GOLO MUNDE NUSA TENGGARA TIMUR 470 Phase 3 100 84 900 18.3 120.80466 -8.52394 17733 5305060005 TAUNBAEN NUSA TENGGARA TIMUR 89 Phase 3 24 16 872 3.6 124.79145 -9.29317 17734 5315031010 SEMANG NUSA TENGGARA TIMUR 117 Phase 3 25 21 225 4.6 120.22081 -8.56215 Annex II – Demand forecast results Page 91 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 17735 5305060005 TAUNBAEN NUSA TENGGARA TIMUR 59 Phase 3 16 11 248 2.4 124.79201 -9.29344 17736 5313130016 LANGKAS NUSA TENGGARA TIMUR 86 Phase 3 23 19 527 4.2 120.50279 -8.44449 17737 5304042003 TETAF NUSA TENGGARA TIMUR 69 Phase 3 17 11 951 2.6 124.36760 -9.83361 17738 5318020009 KELI NUSA TENGGARA TIMUR 133 Phase 3 32 27 168 5.9 121.24712 -8.88925 17739 5306050004 LAWALUTOLUS NUSA TENGGARA TIMUR 138 Phase 3 33 23 199 5.0 124.89008 -9.29508 17740 5318020009 KELI NUSA TENGGARA TIMUR 49 Phase 3 12 10 188 2.2 121.24945 -8.89005 17741 5306050004 LAWALUTOLUS NUSA TENGGARA TIMUR 28 Phase 3 7 4 921 1.1 124.89048 -9.29634 17742 5310070011 NIRANGKLIUNG NUSA TENGGARA TIMUR 105 Phase 3 30 25 470 5.5 122.10133 -8.64482 17743 5306050004 LAWALUTOLUS NUSA TENGGARA TIMUR 62 Phase 3 15 10 545 2.3 124.89280 -9.29689 17744 5319010013 GURUNG LIWUT NUSA TENGGARA TIMUR 235 Phase 3 48 40 752 8.8 120.61936 -8.67912 17745 5306032008 MANDEU NUSA TENGGARA TIMUR 80 Phase 3 18 12 654 2.7 124.89142 -9.30201 17746 5310012009 BU SELATAN NUSA TENGGARA TIMUR 4 Phase 3 2 1 698 0.4 121.95491 -8.75010 17747 5306032007 DUAKORAN NUSA TENGGARA TIMUR 170 Phase 3 35 24 605 5.3 124.89103 -9.31045 17748 5310012009 BU SELATAN NUSA TENGGARA TIMUR 74 Phase 3 20 16 980 3.7 121.95446 -8.74949 17749 5306032007 DUAKORAN NUSA TENGGARA TIMUR 51 Phase 3 11 7 733 1.7 124.89343 -9.31084 17750 5310012009 BU SELATAN NUSA TENGGARA TIMUR 69 Phase 3 18 15 282 3.3 121.95951 -8.74108 17751 5306032007 DUAKORAN NUSA TENGGARA TIMUR 44 Phase 3 9 6 327 1.4 124.89746 -9.31209 17752 5310012011 BU UTARA NUSA TENGGARA TIMUR 46 Phase 3 12 10 188 2.2 121.95829 -8.73739 17753 5306032007 DUAKORAN NUSA TENGGARA TIMUR 185 Phase 3 38 26 714 5.8 124.89865 -9.31571 17754 5310012011 BU UTARA NUSA TENGGARA TIMUR 215 Phase 3 54 45 846 9.9 121.95437 -8.73748 17755 5306032007 DUAKORAN NUSA TENGGARA TIMUR 75 Phase 3 16 11 248 2.4 124.90610 -9.31778 17756 5319030015 LENGKO NAMUT NUSA TENGGARA TIMUR 101 Phase 3 25 21 225 4.6 120.72222 -8.52245 17757 5306032007 DUAKORAN NUSA TENGGARA TIMUR 101 Phase 3 21 14 763 3.2 124.90813 -9.31585 17758 5319030015 LENGKO NAMUT NUSA TENGGARA TIMUR 149 Phase 3 36 30 564 6.6 120.71634 -8.52398 17759 5306032007 DUAKORAN NUSA TENGGARA TIMUR 103 Phase 3 21 14 763 3.2 124.90855 -9.32389 17760 5315050001 LOHA NUSA TENGGARA TIMUR 509 Phase 3 119 101 031 21.8 120.15282 -8.53372 17761 5306032007 DUAKORAN NUSA TENGGARA TIMUR 147 Phase 3 30 21 090 4.6 124.90777 -9.32577 17762 5318040008 NATANAGE NUSA TENGGARA TIMUR 103 Phase 3 21 17 829 3.8 121.16160 -8.75321 17763 5305061008 OEMANU NUSA TENGGARA TIMUR 38 Phase 3 10 7 030 1.5 124.68198 -9.17382 17764 5318040007 OLAKILE NUSA TENGGARA TIMUR 93 Phase 3 19 16 131 3.5 121.16182 -8.75210 17765 5305061007 PONU NUSA TENGGARA TIMUR 189 Phase 3 49 34 447 7.4 124.68845 -9.17314 17766 5318040007 OLAKILE NUSA TENGGARA TIMUR 590 Phase 3 120 101 880 22.0 121.14718 -8.72907 17767 5305061009 NIFUTASI NUSA TENGGARA TIMUR 26 Phase 3 8 5 624 1.2 124.68929 -9.18010 17768 5315030003 NANGA LILI NUSA TENGGARA TIMUR 134 Phase 3 33 28 017 6.0 120.11263 -8.78400 17769 5305061009 NIFUTASI NUSA TENGGARA TIMUR 406 Phase 3 116 81 548 17.6 124.69311 -9.18606 17770 5315030003 NANGA LILI NUSA TENGGARA TIMUR 243 Phase 3 59 50 091 10.8 120.10701 -8.78141 17771 5305061007 PONU NUSA TENGGARA TIMUR 455 Phase 3 117 82 251 17.7 124.70953 -9.15850 17772 5315030003 NANGA LILI NUSA TENGGARA TIMUR 221 Phase 3 54 45 846 9.9 120.10046 -8.78760 17773 5305061007 PONU NUSA TENGGARA TIMUR 55 Phase 3 15 10 545 2.3 124.71236 -9.15678 17774 5319020005 WATU NGGENE NUSA TENGGARA TIMUR 95 Phase 3 20 16 980 3.7 120.78629 -8.84210 17775 5305061009 NIFUTASI NUSA TENGGARA TIMUR 495 Phase 3 141 99 123 21.4 124.69386 -9.19761 17776 5319020005 WATU NGGENE NUSA TENGGARA TIMUR 122 Phase 3 26 22 074 4.8 120.78553 -8.84419 17777 5306032007 DUAKORAN NUSA TENGGARA TIMUR 224 Phase 3 45 31 635 6.8 124.91497 -9.32478 17778 5315030007 MUNTING NUSA TENGGARA TIMUR 256 Phase 3 59 50 091 10.8 120.16958 -8.73305 17779 5304021008 FATUMNUTU NUSA TENGGARA TIMUR 23 Phase 3 6 4 218 0.9 124.33724 -9.62233 17780 5315050013 NANGA KANTOR NUSA TENGGARA TIMUR 102 Phase 3 23 19 527 4.2 120.12439 -8.42328 17781 5304021009 OELNUNUH NUSA TENGGARA TIMUR 16 Phase 3 5 3 515 0.8 124.33758 -9.62265 17782 5315050013 NANGA KANTOR NUSA TENGGARA TIMUR 728 Phase 3 160 135 840 29.3 120.12692 -8.41501 17783 5304021009 OELNUNUH NUSA TENGGARA TIMUR 7 Phase 3 2 1 406 0.3 124.34048 -9.62493 17784 5311070036 KEL. DETUSOKO NUSA TENGGARA TIMUR 69 Phase 3 16 13 584 2.9 121.77751 -8.71437 17785 5304021009 OELNUNUH NUSA TENGGARA TIMUR 87 Phase 3 24 16 872 3.6 124.34087 -9.62528 17786 5311070037 WOLOGAI NUSA TENGGARA TIMUR 91 Phase 3 27 22 923 4.9 121.77869 -8.71465 17787 5304021007 USAPIMNASI NUSA TENGGARA TIMUR 96 Phase 3 27 18 981 4.1 124.34276 -9.62708 17788 5319050013 GOLO LERO NUSA TENGGARA TIMUR 27 Phase 3 9 7 641 1.6 120.61714 -8.55100 17789 5304021008 FATUMNUTU NUSA TENGGARA TIMUR 281 Phase 3 66 46 398 10.0 124.34572 -9.61338 17790 5310012009 BU SELATAN NUSA TENGGARA TIMUR 21 Phase 3 6 5 094 1.1 121.96365 -8.73408 17791 5306052001 DUBESI NUSA TENGGARA TIMUR 126 Phase 3 30 21 090 4.6 124.93637 -9.29981 17792 5310012011 BU UTARA NUSA TENGGARA TIMUR 162 Phase 3 40 33 960 7.3 121.95696 -8.72897 17793 5304013002 LILIANA NUSA TENGGARA TIMUR 33 Phase 3 10 7 030 1.5 124.13700 -9.70247 17794 5310012011 BU UTARA NUSA TENGGARA TIMUR 111 Phase 3 28 23 772 5.1 121.95929 -8.72293 17795 5304013002 LILIANA NUSA TENGGARA TIMUR 17 Phase 3 5 3 515 0.8 124.13602 -9.70271 17796 5310012011 BU UTARA NUSA TENGGARA TIMUR 120 Phase 3 30 25 470 5.5 121.96297 -8.72294 17797 5304013002 LILIANA NUSA TENGGARA TIMUR 75 Phase 3 21 14 763 3.2 124.13622 -9.70473 17798 5310012011 BU UTARA NUSA TENGGARA TIMUR 148 Phase 3 37 31 413 6.8 121.96492 -8.72427 17799 5304013002 LILIANA NUSA TENGGARA TIMUR 288 Phase 3 80 56 240 12.1 124.12194 -9.70298 17800 5315050010 BARI NUSA TENGGARA TIMUR 148 Phase 3 30 25 470 5.5 120.22211 -8.30667 17801 5304013003 NUNBENA NUSA TENGGARA TIMUR 34 Phase 3 9 6 327 1.4 124.14653 -9.67271 17802 5315050010 BARI NUSA TENGGARA TIMUR 84 Phase 3 17 14 433 3.1 120.22768 -8.30488 17803 5304013003 NUNBENA NUSA TENGGARA TIMUR 323 Phase 3 80 56 240 12.1 124.14578 -9.66948 17804 5315050010 BARI NUSA TENGGARA TIMUR 306 Phase 3 61 51 789 11.2 120.23198 -8.30394 17805 5306041002 KOTABIRU NUSA TENGGARA TIMUR 185 Phase 3 54 37 962 8.2 125.01089 -9.37908 17806 5315050008 NGGILAT NUSA TENGGARA TIMUR 266 Phase 3 67 56 883 12.3 120.24974 -8.30796 17807 5305062002 KULUAN NUSA TENGGARA TIMUR 804 Phase 3 192 134 976 29.1 124.73688 -9.25301 17808 5315050008 NGGILAT NUSA TENGGARA TIMUR 514 Phase 3 129 109 521 23.6 120.25096 -8.30847 17809 5303101006 UIBOA NUSA TENGGARA TIMUR 766 Phase 3 185 130 055 28.1 123.34327 -10.25533 17810 5311010018 JEGHARANGGA NUSA TENGGARA TIMUR 101 Phase 3 26 22 074 4.8 121.54993 -8.76877 17811 5303101005 UITIUHTUAN NUSA TENGGARA TIMUR 636 Phase 3 149 104 747 22.6 123.31633 -10.28046 17812 5319020015 GOLOMENI NUSA TENGGARA TIMUR 227 Phase 3 51 43 299 9.3 120.68638 -8.63614 17813 5303101001 NAIKEAN NUSA TENGGARA TIMUR 629 Phase 3 150 105 450 22.8 123.32872 -10.30849 17814 5315020009 NAMPAR MACING NUSA TENGGARA TIMUR 150 Phase 3 39 33 111 7.1 120.07234 -8.66521 17815 5306032005 FATURIKA NUSA TENGGARA TIMUR 150 Phase 3 38 26 714 5.8 124.92537 -9.33193 17816 5315020009 NAMPAR MACING NUSA TENGGARA TIMUR 41 Phase 3 11 9 339 2.0 120.06089 -8.67358 17817 5306032004 MANDEU RAIMANUS NUSA TENGGARA TIMUR 205 Phase 3 45 31 635 6.8 124.92570 -9.33927 17818 5315020009 NAMPAR MACING NUSA TENGGARA TIMUR 162 Phase 3 42 35 658 7.7 120.06490 -8.68082 17819 5306032004 MANDEU RAIMANUS NUSA TENGGARA TIMUR 56 Phase 3 13 9 139 2.0 124.92459 -9.34385 Annex II – Demand forecast results Page 92 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 17820 5315030013 WAE WAKO NUSA TENGGARA TIMUR 194 Phase 3 49 41 601 9.0 120.06585 -8.70322 17821 5306032004 MANDEU RAIMANUS NUSA TENGGARA TIMUR 205 Phase 3 45 31 635 6.8 124.91036 -9.34181 17822 5315030013 WAE WAKO NUSA TENGGARA TIMUR 61 Phase 3 16 13 584 2.9 120.06055 -8.71417 17823 5306032004 MANDEU RAIMANUS NUSA TENGGARA TIMUR 260 Phase 3 57 40 071 8.6 124.90654 -9.34322 17824 5315030013 WAE WAKO NUSA TENGGARA TIMUR 100 Phase 3 26 22 074 4.8 120.05486 -8.71824 17825 5306032004 MANDEU RAIMANUS NUSA TENGGARA TIMUR 18 Phase 3 4 2 812 0.6 124.90691 -9.32618 17826 5315030013 WAE WAKO NUSA TENGGARA TIMUR 85 Phase 3 22 18 678 4.0 120.04652 -8.70792 17827 5304051002 TEAS NUSA TENGGARA TIMUR 51 Phase 3 14 9 842 2.1 124.29942 -9.91646 17828 5315030013 WAE WAKO NUSA TENGGARA TIMUR 826 Phase 3 209 177 441 38.3 120.04259 -8.70085 17829 5304051002 TEAS NUSA TENGGARA TIMUR 102 Phase 3 27 18 981 4.1 124.29678 -9.92280 17830 5310012014 RENGGARASI NUSA TENGGARA TIMUR 142 Phase 3 29 24 621 5.3 121.97696 -8.71668 17831 5304040009 HAUMENIBAKI NUSA TENGGARA TIMUR 34 Phase 3 10 7 030 1.5 124.29072 -9.91943 17832 5319030005 LANGGASAI NUSA TENGGARA TIMUR 280 Phase 3 96 81 504 17.6 120.82535 -8.62248 17833 5304040009 HAUMENIBAKI NUSA TENGGARA TIMUR 36 Phase 3 11 7 733 1.7 124.28976 -9.91739 17834 5319030005 LANGGASAI NUSA TENGGARA TIMUR 55 Phase 3 19 16 131 3.5 120.81634 -8.62646 17835 5304040009 HAUMENIBAKI NUSA TENGGARA TIMUR 90 Phase 3 26 18 278 3.9 124.28925 -9.91455 17836 5319030005 LANGGASAI NUSA TENGGARA TIMUR 147 Phase 3 51 43 299 9.3 120.81428 -8.62894 17837 5304040009 HAUMENIBAKI NUSA TENGGARA TIMUR 22 Phase 3 7 4 921 1.1 124.28769 -9.91780 17838 5313041008 HILIHINTIR NUSA TENGGARA TIMUR 195 Phase 3 40 33 960 7.3 120.36148 -8.76618 17839 5304040009 HAUMENIBAKI NUSA TENGGARA TIMUR 21 Phase 3 6 4 218 0.9 124.28404 -9.92285 17840 5319040004 GOLO NGAWAN NUSA TENGGARA TIMUR 30 Phase 3 8 6 792 1.5 120.69602 -8.52531 17841 5304040009 HAUMENIBAKI NUSA TENGGARA TIMUR 285 Phase 3 80 56 240 12.1 124.28344 -9.92497 17842 5319040004 GOLO NGAWAN NUSA TENGGARA TIMUR 60 Phase 3 15 12 735 2.7 120.69377 -8.51689 17843 5304040009 HAUMENIBAKI NUSA TENGGARA TIMUR 126 Phase 3 36 25 308 5.5 124.27856 -9.92521 17844 5319040004 GOLO NGAWAN NUSA TENGGARA TIMUR 218 Phase 3 53 44 997 9.7 120.69384 -8.51387 17845 5304082001 FATUKOPA NUSA TENGGARA TIMUR 51 Phase 3 15 10 545 2.3 124.58989 -9.65163 17846 5315030006 SURUNUMBENG NUSA TENGGARA TIMUR 266 Phase 3 58 49 242 10.6 120.23194 -8.76700 17847 5304082001 FATUKOPA NUSA TENGGARA TIMUR 59 Phase 3 17 11 951 2.6 124.58748 -9.65387 17848 5310012011 BU UTARA NUSA TENGGARA TIMUR 75 Phase 3 19 16 131 3.5 121.97125 -8.71081 17849 5304080018 TLIU NUSA TENGGARA TIMUR 79 Phase 3 24 16 872 3.6 124.55254 -9.73588 17850 5310012012 BU WATUWETI NUSA TENGGARA TIMUR 179 Phase 3 51 43 299 9.3 121.96643 -8.70842 17851 5304080018 TLIU NUSA TENGGARA TIMUR 143 Phase 3 43 30 229 6.5 124.54469 -9.73983 17852 5311050033 LISELOWOBORA NUSA TENGGARA TIMUR 167 Phase 3 36 30 564 6.6 121.89999 -8.75957 17853 5304080016 SINI NUSA TENGGARA TIMUR 64 Phase 3 21 14 763 3.2 124.54295 -9.73358 17854 5315020009 NAMPAR MACING NUSA TENGGARA TIMUR 106 Phase 3 28 23 772 5.1 120.05009 -8.66141 17855 5304080018 TLIU NUSA TENGGARA TIMUR 17 Phase 3 6 4 218 0.9 124.54355 -9.73325 17856 5315020009 NAMPAR MACING NUSA TENGGARA TIMUR 64 Phase 3 17 14 433 3.1 120.04709 -8.66403 17857 5304080018 TLIU NUSA TENGGARA TIMUR 105 Phase 3 32 22 496 4.9 124.54831 -9.72705 17858 5312030001 WOGOWELA NUSA TENGGARA TIMUR 235 Phase 3 55 46 695 10.1 121.01775 -8.95324 17859 5304080018 TLIU NUSA TENGGARA TIMUR 123 Phase 3 37 26 011 5.6 124.54881 -9.72727 17860 5319030015 LENGKO NAMUT NUSA TENGGARA TIMUR 208 Phase 3 51 43 299 9.3 120.74191 -8.53309 17861 5306040002 LAKEKUN NUSA TENGGARA TIMUR 120 Phase 3 29 20 387 4.4 124.94983 -9.50201 17862 5315010013 WATU NGGELEK NUSA TENGGARA TIMUR 556 Phase 3 146 123 954 26.7 119.90562 -8.55987 17863 5306022001 KEREANA NUSA TENGGARA TIMUR 55 Phase 3 18 12 654 2.7 124.94213 -9.50037 17864 5319020013 PAAN LELENG NUSA TENGGARA TIMUR 64 Phase 3 14 11 886 2.6 120.68634 -8.72716 17865 5306022001 KEREANA NUSA TENGGARA TIMUR 19 Phase 3 7 4 921 1.1 124.94169 -9.49986 17866 5319020013 PAAN LELENG NUSA TENGGARA TIMUR 193 Phase 3 42 35 658 7.7 120.69170 -8.72274 17867 5306022001 KEREANA NUSA TENGGARA TIMUR 34 Phase 3 11 7 733 1.7 124.94306 -9.48993 17868 5318070004 TENDATOTO NUSA TENGGARA TIMUR 45 Phase 3 10 8 490 1.8 121.47976 -8.63749 17869 5306030006 SANLEO NUSA TENGGARA TIMUR 110 Phase 3 28 19 684 4.2 124.94769 -9.48361 17870 5318070004 TENDATOTO NUSA TENGGARA TIMUR 264 Phase 3 57 48 393 10.4 121.47357 -8.63931 17871 5306030006 SANLEO NUSA TENGGARA TIMUR 205 Phase 3 52 36 556 7.9 124.95000 -9.48285 17872 5318070004 TENDATOTO NUSA TENGGARA TIMUR 199 Phase 3 43 36 507 7.9 121.47038 -8.63774 17873 5306030006 SANLEO NUSA TENGGARA TIMUR 193 Phase 3 49 34 447 7.4 124.94847 -9.47704 17874 5319030009 TENO MESE NUSA TENGGARA TIMUR 135 Phase 3 27 22 923 4.9 120.77789 -8.59874 17875 5303141005 SEKI NUSA TENGGARA TIMUR 108 Phase 3 32 22 496 4.9 124.11731 -10.04349 17876 5319030009 TENO MESE NUSA TENGGARA TIMUR 141 Phase 3 28 23 772 5.1 120.77631 -8.60217 17877 5303141005 SEKI NUSA TENGGARA TIMUR 29 Phase 3 9 6 327 1.4 124.11309 -10.04436 17878 5312020010 BEJA NUSA TENGGARA TIMUR 31 Phase 3 7 5 943 1.3 120.96108 -8.84381 17879 5303141005 SEKI NUSA TENGGARA TIMUR 94 Phase 3 28 19 684 4.2 124.11227 -10.04137 17880 5319040004 GOLO NGAWAN NUSA TENGGARA TIMUR 123 Phase 3 30 25 470 5.5 120.70652 -8.51273 17881 5303141005 SEKI NUSA TENGGARA TIMUR 112 Phase 3 33 23 199 5.0 124.11181 -10.04554 17882 5319040005 BUTI NUSA TENGGARA TIMUR 245 Phase 3 59 50 091 10.8 120.70840 -8.50355 17883 5303141005 SEKI NUSA TENGGARA TIMUR 73 Phase 3 22 15 466 3.3 124.09370 -10.05345 17884 5319040005 BUTI NUSA TENGGARA TIMUR 61 Phase 3 15 12 735 2.7 120.71280 -8.50079 17885 5303141005 SEKI NUSA TENGGARA TIMUR 29 Phase 3 9 6 327 1.4 124.09014 -10.05269 17886 5319040005 BUTI NUSA TENGGARA TIMUR 446 Phase 3 107 90 843 19.6 120.71810 -8.50073 17887 5303141005 SEKI NUSA TENGGARA TIMUR 74 Phase 3 22 15 466 3.3 124.08124 -10.04798 17888 5311071013 TANALI NUSA TENGGARA TIMUR 95 Phase 3 27 22 923 4.9 121.71043 -8.61507 17889 5303141005 SEKI NUSA TENGGARA TIMUR 78 Phase 3 23 16 169 3.5 124.08265 -10.04508 17890 5311071013 TANALI NUSA TENGGARA TIMUR 297 Phase 3 84 71 316 15.4 121.70848 -8.61977 17891 5303141005 SEKI NUSA TENGGARA TIMUR 266 Phase 3 78 54 834 11.8 124.07990 -10.04241 17892 5311050036 LIKANAKA NUSA TENGGARA TIMUR 78 Phase 3 20 16 980 3.7 121.90439 -8.74453 17893 5303160009 SILLU NUSA TENGGARA TIMUR 382 Phase 3 79 55 537 12.0 124.07245 -10.03694 17894 5311050036 LIKANAKA NUSA TENGGARA TIMUR 70 Phase 3 18 15 282 3.3 121.90647 -8.74889 17895 5304051003 OEPLIKI NUSA TENGGARA TIMUR 63 Phase 3 18 12 654 2.7 124.32761 -9.98566 17896 5311052005 WOLOLELE A NUSA TENGGARA TIMUR 46 Phase 3 13 11 037 2.4 121.90691 -8.74883 17897 5306020006 UMANENLAWALU NUSA TENGGARA TIMUR 238 Phase 3 64 44 992 9.7 124.91030 -9.59129 17898 5310010008 LENANDARETA NUSA TENGGARA TIMUR 110 Phase 3 31 26 319 5.7 122.01742 -8.74251 17899 5304041004 OEHALA NUSA TENGGARA TIMUR 57 Phase 3 15 10 545 2.3 124.18519 -9.93802 17900 5312020010 BEJA NUSA TENGGARA TIMUR 41 Phase 3 9 7 641 1.6 120.95774 -8.84181 17901 5303170006 OELNAINENO NUSA TENGGARA TIMUR 369 Phase 3 86 60 458 13.0 123.97629 -9.83596 17902 5319040005 BUTI NUSA TENGGARA TIMUR 132 Phase 3 32 27 168 5.9 120.71200 -8.49882 17903 5305024001 NILULAT NUSA TENGGARA TIMUR 65 Phase 3 21 14 763 3.2 124.32962 -9.49336 17904 5319060008 GOLO RENTUNG NUSA TENGGARA TIMUR 120 Phase 3 33 28 017 6.0 120.60532 -8.43209 Annex II – Demand forecast results Page 93 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 17905 5305024003 HAUMENI 'ANA NUSA TENGGARA TIMUR 96 Phase 3 28 19 684 4.2 124.33358 -9.48939 17906 5319060008 GOLO RENTUNG NUSA TENGGARA TIMUR 162 Phase 3 44 37 356 8.1 120.59739 -8.42669 17907 5306032005 FATURIKA NUSA TENGGARA TIMUR 144 Phase 3 37 26 011 5.6 124.92664 -9.33032 17908 5311050016 BOKASAPE TIMUR NUSA TENGGARA TIMUR 84 Phase 3 23 19 527 4.2 121.89531 -8.80304 17909 5303121001 OELETSALA NUSA TENGGARA TIMUR 191 Phase 3 45 31 635 6.8 123.69635 -10.23115 17910 5315020020 GOLO DAMU NUSA TENGGARA TIMUR 264 Phase 3 61 51 789 11.2 120.02852 -8.59348 17911 5303170003 BENU NUSA TENGGARA TIMUR 61 Phase 3 13 9 139 2.0 123.99658 -9.93846 17912 5318030008 DEGALEA NUSA TENGGARA TIMUR 130 Phase 3 31 26 319 5.7 121.32285 -8.82108 17913 5303170003 BENU NUSA TENGGARA TIMUR 121 Phase 3 25 17 575 3.8 123.99861 -9.94275 17914 5318030008 DEGALEA NUSA TENGGARA TIMUR 189 Phase 3 44 37 356 8.1 121.31990 -8.81967 17915 5303170003 BENU NUSA TENGGARA TIMUR 151 Phase 3 31 21 793 4.7 123.99949 -9.94676 17916 5315020013 WATU WANGKA NUSA TENGGARA TIMUR 50 Phase 3 12 10 188 2.2 120.06894 -8.60488 17917 5303170003 BENU NUSA TENGGARA TIMUR 387 Phase 3 80 56 240 12.1 124.00200 -9.94753 17918 5318030002 PODENURA NUSA TENGGARA TIMUR 48 Phase 3 12 10 188 2.2 121.36235 -8.88318 17919 5304040009 HAUMENIBAKI NUSA TENGGARA TIMUR 54 Phase 3 16 11 248 2.4 124.28287 -9.91391 17920 5311020018 NAKURAMBA NUSA TENGGARA TIMUR 35 Phase 3 13 11 037 2.4 121.57414 -8.75262 17921 5304040009 HAUMENIBAKI NUSA TENGGARA TIMUR 105 Phase 3 30 21 090 4.6 124.27838 -9.91398 17922 5311020021 UZURAMBA NUSA TENGGARA TIMUR 276 Phase 3 59 50 091 10.8 121.56931 -8.74517 17923 5305043004 TAINSALA NUSA TENGGARA TIMUR 165 Phase 3 42 29 526 6.4 124.61001 -9.26002 17924 5311020021 UZURAMBA NUSA TENGGARA TIMUR 226 Phase 3 48 40 752 8.8 121.56485 -8.74397 17925 5305052003 MATABESI NUSA TENGGARA TIMUR 147 Phase 3 47 33 041 7.1 124.62274 -9.26302 17926 5319060016 SATAR PUNDA NUSA TENGGARA TIMUR 123 Phase 3 51 43 299 9.3 120.49597 -8.33709 17927 5305052002 LUNIUP NUSA TENGGARA TIMUR 174 Phase 3 39 27 417 5.9 124.62426 -9.26690 17928 5315050006 WONTONG NUSA TENGGARA TIMUR 181 Phase 3 37 31 413 6.8 120.28682 -8.43747 17929 5305052002 LUNIUP NUSA TENGGARA TIMUR 634 Phase 3 140 98 420 21.2 124.62823 -9.26490 17930 5313140001 NGGALAK NUSA TENGGARA TIMUR 481 Phase 3 113 95 937 20.7 120.30659 -8.44051 17931 5305052002 LUNIUP NUSA TENGGARA TIMUR 65 Phase 3 15 10 545 2.3 124.62635 -9.26981 17932 5315010013 WATU NGGELEK NUSA TENGGARA TIMUR 93 Phase 3 25 21 225 4.6 119.90701 -8.56832 17933 5305052002 LUNIUP NUSA TENGGARA TIMUR 14 Phase 3 4 2 812 0.6 124.64459 -9.28402 17934 5315010013 WATU NGGELEK NUSA TENGGARA TIMUR 18 Phase 3 5 4 245 0.9 119.90576 -8.57245 17935 5305052002 LUNIUP NUSA TENGGARA TIMUR 15 Phase 3 4 2 812 0.6 124.64623 -9.28330 17936 5315010013 WATU NGGELEK NUSA TENGGARA TIMUR 260 Phase 3 68 57 732 12.5 119.90334 -8.57241 17937 5305052001 TUNBES NUSA TENGGARA TIMUR 120 Phase 3 30 21 090 4.6 124.64835 -9.28753 17938 5311053003 KOANARA NUSA TENGGARA TIMUR 36 Phase 3 14 11 886 2.6 121.85786 -8.72884 17939 5305052001 TUNBES NUSA TENGGARA TIMUR 323 Phase 3 81 56 943 12.3 124.65165 -9.28698 17940 5311053003 KOANARA NUSA TENGGARA TIMUR 100 Phase 3 37 31 413 6.8 121.86061 -8.72743 17941 5305052001 TUNBES NUSA TENGGARA TIMUR 18 Phase 3 5 3 515 0.8 124.64535 -9.28938 17942 5311053003 KOANARA NUSA TENGGARA TIMUR 64 Phase 3 24 20 376 4.4 121.86374 -8.73070 17943 5305050013 TUNBAEN NUSA TENGGARA TIMUR 55 Phase 3 14 9 842 2.1 124.64367 -9.28985 17944 5311063005 NDENGGARONGGE NUSA TENGGARA TIMUR 302 Phase 3 74 62 826 13.6 121.87440 -8.71524 17945 5305050013 TUNBAEN NUSA TENGGARA TIMUR 37 Phase 3 10 7 030 1.5 124.64544 -9.30683 17946 5311063005 NDENGGARONGGE NUSA TENGGARA TIMUR 27 Phase 3 7 5 943 1.3 121.87509 -8.71556 17947 5305050013 TUNBAEN NUSA TENGGARA TIMUR 78 Phase 3 20 14 060 3.0 124.64745 -9.30761 17948 5311063006 TANALANGI NUSA TENGGARA TIMUR 142 Phase 3 33 28 017 6.0 121.88579 -8.71494 17949 5305050013 TUNBAEN NUSA TENGGARA TIMUR 781 Phase 3 198 139 194 30.0 124.65164 -9.30812 17950 5311063006 TANALANGI NUSA TENGGARA TIMUR 127 Phase 3 30 25 470 5.5 121.89821 -8.70742 17951 5304110010 FATUONI NUSA TENGGARA TIMUR 57 Phase 3 18 12 654 2.7 124.70231 -9.66838 17952 5311063006 TANALANGI NUSA TENGGARA TIMUR 160 Phase 3 37 31 413 6.8 121.90204 -8.70528 17953 5304110010 FATUONI NUSA TENGGARA TIMUR 87 Phase 3 27 18 981 4.1 124.70437 -9.66579 17954 5311063007 TANIWODA NUSA TENGGARA TIMUR 156 Phase 3 34 28 866 6.2 121.90023 -8.69731 17955 5304110010 FATUONI NUSA TENGGARA TIMUR 148 Phase 3 45 31 635 6.8 124.70118 -9.65689 17956 5311063007 TANIWODA NUSA TENGGARA TIMUR 139 Phase 3 30 25 470 5.5 121.90342 -8.69586 17957 5303180008 LELOBOKO NUSA TENGGARA TIMUR 211 Phase 3 42 29 526 6.4 123.93620 -9.69798 17958 5311063007 TANIWODA NUSA TENGGARA TIMUR 101 Phase 3 22 18 678 4.0 121.90544 -8.69247 17959 5303180008 LELOBOKO NUSA TENGGARA TIMUR 359 Phase 3 72 50 616 10.9 123.92958 -9.69909 17960 5311063007 TANIWODA NUSA TENGGARA TIMUR 173 Phase 3 37 31 413 6.8 121.90894 -8.68086 17961 5304100012 KUALEU NUSA TENGGARA TIMUR 165 Phase 3 42 29 526 6.4 124.66739 -9.85894 17962 5311063007 TANIWODA NUSA TENGGARA TIMUR 295 Phase 3 63 53 487 11.5 121.91625 -8.68509 17963 5304100015 TOI NUSA TENGGARA TIMUR 118 Phase 3 30 21 090 4.6 124.61615 -9.81419 17964 5311063008 DETUARA NUSA TENGGARA TIMUR 269 Phase 3 72 61 128 13.2 121.91982 -8.67586 17965 5304090013 NAPI NUSA TENGGARA TIMUR 117 Phase 3 32 22 496 4.9 124.54604 -9.81424 17966 5311063009 TIWUSORA NUSA TENGGARA TIMUR 130 Phase 3 34 28 866 6.2 121.93037 -8.66528 17967 5304021006 BIJELI NUSA TENGGARA TIMUR 145 Phase 3 41 28 823 6.2 124.32690 -9.65003 17968 5311063009 TIWUSORA NUSA TENGGARA TIMUR 123 Phase 3 32 27 168 5.9 121.92807 -8.65822 17969 5304040010 MNELALETE NUSA TENGGARA TIMUR 84 Phase 3 17 11 951 2.6 124.27345 -9.90589 17970 5311063009 TIWUSORA NUSA TENGGARA TIMUR 139 Phase 3 36 30 564 6.6 121.94545 -8.64152 17971 5304040009 HAUMENIBAKI NUSA TENGGARA TIMUR 247 Phase 3 69 48 507 10.5 124.26832 -9.91158 17972 5311061012 LISELANDE NUSA TENGGARA TIMUR 11 Phase 3 3 2 547 0.5 121.93832 -8.62513 17973 5304040009 HAUMENIBAKI NUSA TENGGARA TIMUR 70 Phase 3 20 14 060 3.0 124.26747 -9.91522 17974 5311061012 LISELANDE NUSA TENGGARA TIMUR 86 Phase 3 21 17 829 3.8 121.93863 -8.62463 17975 5303191006 SOLIU NUSA TENGGARA TIMUR 246 Phase 3 62 43 586 9.4 123.72293 -9.59336 17976 5311061012 LISELANDE NUSA TENGGARA TIMUR 249 Phase 3 61 51 789 11.2 121.94510 -8.62357 17977 5303181004 BIOBA BARUTAEN NUSA TENGGARA TIMUR 340 Phase 3 83 58 349 12.6 123.68942 -9.64192 17978 5311063009 TIWUSORA NUSA TENGGARA TIMUR 111 Phase 3 29 24 621 5.3 121.96466 -8.62252 17979 5303181004 BIOBA BARUTAEN NUSA TENGGARA TIMUR 78 Phase 3 19 13 357 2.9 123.68587 -9.63998 17980 5310012018 POMA NUSA TENGGARA TIMUR 484 Phase 3 140 118 860 25.6 121.96808 -8.63028 17981 5303181004 BIOBA BARUTAEN NUSA TENGGARA TIMUR 269 Phase 3 65 45 695 9.9 123.68308 -9.64053 17982 5310012018 POMA NUSA TENGGARA TIMUR 442 Phase 3 128 108 672 23.4 121.97497 -8.61996 17983 5303181001 MANUBELON NUSA TENGGARA TIMUR 120 Phase 3 24 16 872 3.6 123.68451 -9.64937 17984 5310011010 NAPU GERA NUSA TENGGARA TIMUR 627 Phase 3 128 108 672 23.4 121.99040 -8.62072 17985 5303181001 MANUBELON NUSA TENGGARA TIMUR 522 Phase 3 103 72 409 15.6 123.68040 -9.65699 17986 5319060016 SATAR PUNDA NUSA TENGGARA TIMUR 114 Phase 3 47 39 903 8.6 120.50751 -8.33262 17987 5303181001 MANUBELON NUSA TENGGARA TIMUR 52 Phase 3 11 7 733 1.7 123.67883 -9.65752 17988 5319060016 SATAR PUNDA NUSA TENGGARA TIMUR 26 Phase 3 11 9 339 2.0 120.51796 -8.33017 17989 5303181001 MANUBELON NUSA TENGGARA TIMUR 15 Phase 3 3 2 109 0.5 123.68025 -9.65949 Annex II – Demand forecast results Page 94 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 17990 5319060016 SATAR PUNDA NUSA TENGGARA TIMUR 18 Phase 3 8 6 792 1.5 120.51630 -8.32448 17991 5303181001 MANUBELON NUSA TENGGARA TIMUR 73 Phase 3 15 10 545 2.3 123.68580 -9.66369 17992 5319060016 SATAR PUNDA NUSA TENGGARA TIMUR 214 Phase 3 88 74 712 16.1 120.51775 -8.32195 17993 5303181001 MANUBELON NUSA TENGGARA TIMUR 23 Phase 3 5 3 515 0.8 123.68298 -9.66819 17994 5315030007 MUNTING NUSA TENGGARA TIMUR 72 Phase 3 17 14 433 3.1 120.17381 -8.73437 17995 5303181001 MANUBELON NUSA TENGGARA TIMUR 641 Phase 3 127 89 281 19.3 123.68418 -9.67122 17996 5319060001 TENGKULAWAR NUSA TENGGARA TIMUR 167 Phase 3 57 48 393 10.4 120.55133 -8.48344 17997 5304040014 NUSA NUSA TENGGARA TIMUR 124 Phase 3 30 21 090 4.6 124.39070 -9.83297 17998 5311071008 MAUTENDA NUSA TENGGARA TIMUR 23 Phase 3 5 4 245 0.9 121.70370 -8.61785 17999 5304040014 NUSA NUSA TENGGARA TIMUR 93 Phase 3 23 16 169 3.5 124.38672 -9.83337 18000 5311071008 MAUTENDA NUSA TENGGARA TIMUR 17 Phase 3 4 3 396 0.7 121.69707 -8.62484 18001 5304042003 TETAF NUSA TENGGARA TIMUR 76 Phase 3 19 13 357 2.9 124.38553 -9.83002 18002 5311071008 MAUTENDA NUSA TENGGARA TIMUR 251 Phase 3 54 45 846 9.9 121.69679 -8.62585 18003 5304042003 TETAF NUSA TENGGARA TIMUR 66 Phase 3 16 11 248 2.4 124.38654 -9.82893 18004 5311071003 RATEWATI NUSA TENGGARA TIMUR 217 Phase 3 46 39 054 8.4 121.68554 -8.62200 18005 5306030006 SANLEO NUSA TENGGARA TIMUR 119 Phase 3 31 21 793 4.7 124.93616 -9.44738 18006 5315030012 SIRU NUSA TENGGARA TIMUR 18 Phase 3 4 3 396 0.7 120.12856 -8.69331 18007 5306030006 SANLEO NUSA TENGGARA TIMUR 54 Phase 3 14 9 842 2.1 124.94565 -9.45660 18008 5315030012 SIRU NUSA TENGGARA TIMUR 51 Phase 3 11 9 339 2.0 120.12739 -8.69483 18009 5306030006 SANLEO NUSA TENGGARA TIMUR 239 Phase 3 61 42 883 9.3 124.95285 -9.46003 18010 5315030013 WAE WAKO NUSA TENGGARA TIMUR 558 Phase 3 141 119 709 25.8 120.10877 -8.69317 18011 5306030006 SANLEO NUSA TENGGARA TIMUR 332 Phase 3 85 59 755 12.9 124.93367 -9.46540 18012 5315030012 SIRU NUSA TENGGARA TIMUR 55 Phase 3 12 10 188 2.2 120.12780 -8.69776 18013 5304080010 NIFUKIU NUSA TENGGARA TIMUR 88 Phase 3 24 16 872 3.6 124.64374 -9.70106 18014 5310012011 BU UTARA NUSA TENGGARA TIMUR 70 Phase 3 18 15 282 3.3 121.96615 -8.71308 18015 5304080010 NIFUKIU NUSA TENGGARA TIMUR 96 Phase 3 26 18 278 3.9 124.65291 -9.69919 18016 5311071002 MAUTENDA BARAT NUSA TENGGARA TIMUR 308 Phase 3 66 56 034 12.1 121.68785 -8.64700 18017 5304080010 NIFUKIU NUSA TENGGARA TIMUR 165 Phase 3 45 31 635 6.8 124.65391 -9.69484 18018 5311071002 MAUTENDA BARAT NUSA TENGGARA TIMUR 212 Phase 3 46 39 054 8.4 121.69083 -8.65187 18019 5306013006 TAABA NUSA TENGGARA TIMUR 175 Phase 3 47 33 041 7.1 124.83334 -9.65392 18020 5311071008 MAUTENDA NUSA TENGGARA TIMUR 627 Phase 3 133 112 917 24.4 121.70173 -8.64938 18021 5304021001 LAOB NUSA TENGGARA TIMUR 71 Phase 3 20 14 060 3.0 124.32192 -9.71644 18022 5315010007 GOLO PONGKOR NUSA TENGGARA TIMUR 37 Phase 3 10 8 490 1.8 119.89844 -8.57889 18023 5306032005 FATURIKA NUSA TENGGARA TIMUR 117 Phase 3 30 21 090 4.6 124.93146 -9.33096 18024 5315010007 GOLO PONGKOR NUSA TENGGARA TIMUR 614 Phase 3 150 127 350 27.5 119.89909 -8.58072 18025 5306023001 FATOIN NUSA TENGGARA TIMUR 99 Phase 3 24 16 872 3.6 124.75755 -9.55218 18026 5310010008 LENANDARETA NUSA TENGGARA TIMUR 10 Phase 3 3 2 547 0.5 122.01991 -8.73664 18027 5306020002 KAKANIUK NUSA TENGGARA TIMUR 49 Phase 3 13 9 139 2.0 124.82685 -9.56793 18028 5310010015 MASEBEWA NUSA TENGGARA TIMUR 78 Phase 3 23 19 527 4.2 122.01978 -8.73628 18029 5304100017 LANU NUSA TENGGARA TIMUR 111 Phase 3 32 22 496 4.9 124.66208 -9.84243 18030 5310010008 LENANDARETA NUSA TENGGARA TIMUR 68 Phase 3 19 16 131 3.5 122.02439 -8.73934 18031 5304050019 ENO NETTEN NUSA TENGGARA TIMUR 79 Phase 3 22 15 466 3.3 124.25576 -9.95272 18032 5310010008 LENANDARETA NUSA TENGGARA TIMUR 51 Phase 3 15 12 735 2.7 122.02865 -8.73909 18033 5304050019 ENO NETTEN NUSA TENGGARA TIMUR 170 Phase 3 46 32 338 7.0 124.25503 -9.95624 18034 5310010008 LENANDARETA NUSA TENGGARA TIMUR 43 Phase 3 12 10 188 2.2 122.03515 -8.73877 18035 5304050019 ENO NETTEN NUSA TENGGARA TIMUR 90 Phase 3 25 17 575 3.8 124.23607 -9.96558 18036 5310010008 LENANDARETA NUSA TENGGARA TIMUR 124 Phase 3 35 29 715 6.4 122.03446 -8.73508 18037 5304050019 ENO NETTEN NUSA TENGGARA TIMUR 34 Phase 3 10 7 030 1.5 124.23662 -9.96690 18038 5310010008 LENANDARETA NUSA TENGGARA TIMUR 102 Phase 3 29 24 621 5.3 122.03985 -8.74106 18039 5304050019 ENO NETTEN NUSA TENGGARA TIMUR 138 Phase 3 38 26 714 5.8 124.24365 -9.98494 18040 5319010001 BEA NGENCUNG NUSA TENGGARA TIMUR 47 Phase 3 11 9 339 2.0 120.53707 -8.81039 18041 5304050019 ENO NETTEN NUSA TENGGARA TIMUR 121 Phase 3 33 23 199 5.0 124.24354 -9.98926 18042 5318070004 TENDATOTO NUSA TENGGARA TIMUR 104 Phase 3 23 19 527 4.2 121.45628 -8.64036 18043 5304050019 ENO NETTEN NUSA TENGGARA TIMUR 167 Phase 3 45 31 635 6.8 124.24405 -9.99394 18044 5318070004 TENDATOTO NUSA TENGGARA TIMUR 167 Phase 3 37 31 413 6.8 121.45185 -8.64092 18045 5304051001 OE EKAM NUSA TENGGARA TIMUR 519 Phase 3 116 81 548 17.6 124.24063 -10.01047 18046 5318070004 TENDATOTO NUSA TENGGARA TIMUR 38 Phase 3 9 7 641 1.6 121.44412 -8.64199 18047 5304050012 LINAMNUTU NUSA TENGGARA TIMUR 126 Phase 3 30 21 090 4.6 124.23517 -10.01324 18048 5318070003 TOTOMALA NUSA TENGGARA TIMUR 915 Phase 3 222 188 478 40.7 121.42475 -8.61475 18049 5304050012 LINAMNUTU NUSA TENGGARA TIMUR 228 Phase 3 54 37 962 8.2 124.23216 -10.01750 18050 5313130025 GOLO WOI NUSA TENGGARA TIMUR 221 Phase 3 54 45 846 9.9 120.42299 -8.45746 18051 5306032005 FATURIKA NUSA TENGGARA TIMUR 152 Phase 3 39 27 417 5.9 124.93366 -9.33240 18052 5319010007 RANA MASAK NUSA TENGGARA TIMUR 29 Phase 3 8 6 792 1.5 120.66502 -8.74376 18053 5304021001 LAOB NUSA TENGGARA TIMUR 64 Phase 3 18 12 654 2.7 124.32186 -9.71153 18054 5319020013 PAAN LELENG NUSA TENGGARA TIMUR 42 Phase 3 10 8 490 1.8 120.66169 -8.74032 18055 5304021001 LAOB NUSA TENGGARA TIMUR 141 Phase 3 39 27 417 5.9 124.32863 -9.71286 18056 5319020013 PAAN LELENG NUSA TENGGARA TIMUR 179 Phase 3 39 33 111 7.1 120.66418 -8.73630 18057 5306031005 NAEKEKUSA NUSA TENGGARA TIMUR 28 Phase 3 8 5 624 1.2 124.87792 -9.43103 18058 5319030004 NANGA MEJE NUSA TENGGARA TIMUR 57 Phase 3 14 11 886 2.6 120.83223 -8.63274 18059 5304042003 TETAF NUSA TENGGARA TIMUR 70 Phase 3 17 11 951 2.6 124.44355 -9.82607 18060 5319030004 NANGA MEJE NUSA TENGGARA TIMUR 120 Phase 3 29 24 621 5.3 120.83250 -8.63721 18061 5304051004 NAIP NUSA TENGGARA TIMUR 110 Phase 3 21 14 763 3.2 124.33870 -10.04325 18062 5319030004 NANGA MEJE NUSA TENGGARA TIMUR 64 Phase 3 15 12 735 2.7 120.83471 -8.64322 18063 5304051004 NAIP NUSA TENGGARA TIMUR 143 Phase 3 28 19 684 4.2 124.34273 -10.03837 18064 5319030004 NANGA MEJE NUSA TENGGARA TIMUR 315 Phase 3 74 62 826 13.6 120.83789 -8.65104 18065 5304051004 NAIP NUSA TENGGARA TIMUR 147 Phase 3 28 19 684 4.2 124.34301 -10.03089 18066 5311062012 NGGESA BIRI NUSA TENGGARA TIMUR 12 Phase 3 3 2 547 0.5 121.81875 -8.58757 18067 5304051004 NAIP NUSA TENGGARA TIMUR 305 Phase 3 59 41 477 8.9 124.34751 -10.02898 18068 5311062003 NGGESA NUSA TENGGARA TIMUR 69 Phase 3 14 11 886 2.6 121.81848 -8.58786 18069 5304051004 NAIP NUSA TENGGARA TIMUR 136 Phase 3 26 18 278 3.9 124.34772 -10.02444 18070 5311062002 DETUMBEWA NUSA TENGGARA TIMUR 368 Phase 3 90 76 410 16.5 121.80894 -8.58059 18071 5304051004 NAIP NUSA TENGGARA TIMUR 171 Phase 3 33 23 199 5.0 124.34607 -10.02216 18072 5312082004 NGINAMANU NUSA TENGGARA TIMUR 539 Phase 3 105 89 145 19.2 121.01491 -8.63377 18073 5305042007 DESA ADMEN NUSA TENGGARA TIMUR 23 Phase 3 9 6 327 1.4 124.57361 -9.49938 18074 5311062005 KEBESANI NUSA TENGGARA TIMUR 300 Phase 3 71 60 279 13.0 121.81812 -8.63405 Annex II – Demand forecast results Page 95 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 18075 5305042004 ATMEN NUSA TENGGARA TIMUR 81 Phase 3 40 28 120 6.1 124.58135 -9.49741 18076 5318040007 OLAKILE NUSA TENGGARA TIMUR 307 Phase 3 62 52 638 11.4 121.15991 -8.71861 18077 5305042004 ATMEN NUSA TENGGARA TIMUR 15 Phase 3 8 5 624 1.2 124.59063 -9.50615 18078 5319030011 LEMPANG PAJI NUSA TENGGARA TIMUR 105 Phase 3 26 22 074 4.8 120.81835 -8.51920 18079 5305042004 ATMEN NUSA TENGGARA TIMUR 6 Phase 3 3 2 109 0.5 124.58967 -9.50797 18080 5319030011 LEMPANG PAJI NUSA TENGGARA TIMUR 460 Phase 3 114 96 786 20.9 120.82271 -8.52108 18081 5305022008 TUBLOPO NUSA TENGGARA TIMUR 171 Phase 3 42 29 526 6.4 124.58279 -9.51129 18082 5319050024 COMPANG WUNIS NUSA TENGGARA TIMUR 17 Phase 3 5 4 245 0.9 120.64477 -8.50796 18083 5305022008 TUBLOPO NUSA TENGGARA TIMUR 553 Phase 3 136 95 608 20.6 124.56727 -9.52667 18084 5319050024 COMPANG WUNIS NUSA TENGGARA TIMUR 41 Phase 3 12 10 188 2.2 120.64028 -8.50795 18085 5305022008 TUBLOPO NUSA TENGGARA TIMUR 476 Phase 3 117 82 251 17.7 124.56974 -9.53234 18086 5319050024 COMPANG WUNIS NUSA TENGGARA TIMUR 55 Phase 3 16 13 584 2.9 120.63668 -8.50730 18087 5304040011 PUSU NUSA TENGGARA TIMUR 177 Phase 3 45 31 635 6.8 124.33691 -9.90793 18088 5319050024 COMPANG WUNIS NUSA TENGGARA TIMUR 352 Phase 3 97 82 353 17.8 120.63172 -8.50663 18089 5304023005 OELEKAM NUSA TENGGARA TIMUR 25 Phase 3 7 4 921 1.1 124.30879 -9.80192 18090 5315020020 GOLO DAMU NUSA TENGGARA TIMUR 123 Phase 3 28 23 772 5.1 120.02918 -8.58352 18091 5304023005 OELEKAM NUSA TENGGARA TIMUR 16 Phase 3 5 3 515 0.8 124.31122 -9.80056 18092 5315020020 GOLO DAMU NUSA TENGGARA TIMUR 226 Phase 3 52 44 148 9.5 120.02016 -8.58132 18093 5304023005 OELEKAM NUSA TENGGARA TIMUR 325 Phase 3 85 59 755 12.9 124.31456 -9.79186 18094 5313140004 SAMBI NUSA TENGGARA TIMUR 200 Phase 3 48 40 752 8.8 120.38016 -8.41787 18095 5304023005 OELEKAM NUSA TENGGARA TIMUR 147 Phase 3 39 27 417 5.9 124.31716 -9.79163 18096 5312080013 NANGAMESE NUSA TENGGARA TIMUR 21 Phase 3 5 4 245 0.9 121.02333 -8.41571 18097 5303100009 UIASA NUSA TENGGARA TIMUR 31 Phase 3 8 5 624 1.2 123.46910 -10.17801 18098 5312080013 NANGAMESE NUSA TENGGARA TIMUR 127 Phase 3 30 25 470 5.5 121.02886 -8.41454 18099 5303100010 HANSISI NUSA TENGGARA TIMUR 56 Phase 3 14 9 842 2.1 123.47746 -10.17745 18100 5312080013 NANGAMESE NUSA TENGGARA TIMUR 212 Phase 3 49 41 601 9.0 121.02008 -8.41119 18101 5303100010 HANSISI NUSA TENGGARA TIMUR 60 Phase 3 15 10 545 2.3 123.47785 -10.17946 18102 5319040011 NANGA MBAUR NUSA TENGGARA TIMUR 149 Phase 3 23 19 527 4.2 120.76728 -8.37362 18103 5303100010 HANSISI NUSA TENGGARA TIMUR 106 Phase 3 27 18 981 4.1 123.47840 -10.18107 18104 5311020011 MBOTUTENDA NUSA TENGGARA TIMUR 170 Phase 3 38 32 262 7.0 121.62399 -8.74377 18105 5303100010 HANSISI NUSA TENGGARA TIMUR 251 Phase 3 63 44 289 9.6 123.47156 -10.18697 18106 5313130021 RIUNG NUSA TENGGARA TIMUR 194 Phase 3 40 33 960 7.3 120.47136 -8.40182 18107 5304010017 FATUKOTO NUSA TENGGARA TIMUR 212 Phase 3 48 33 744 7.3 124.24424 -9.71075 18108 5313140008 BAJAK NUSA TENGGARA TIMUR 260 Phase 3 56 47 544 10.3 120.47196 -8.38989 18109 5304010017 FATUKOTO NUSA TENGGARA TIMUR 36 Phase 3 9 6 327 1.4 124.24179 -9.71292 18110 5319030004 NANGA MEJE NUSA TENGGARA TIMUR 115 Phase 3 27 22 923 4.9 120.84881 -8.65960 18111 5304010017 FATUKOTO NUSA TENGGARA TIMUR 416 Phase 3 93 65 379 14.1 124.24301 -9.71740 18112 5319030004 NANGA MEJE NUSA TENGGARA TIMUR 75 Phase 3 18 15 282 3.3 120.85560 -8.64963 18113 5304010017 FATUKOTO NUSA TENGGARA TIMUR 129 Phase 3 29 20 387 4.4 124.24599 -9.71524 18114 5319030004 NANGA MEJE NUSA TENGGARA TIMUR 128 Phase 3 30 25 470 5.5 120.88646 -8.65458 18115 5304010017 FATUKOTO NUSA TENGGARA TIMUR 147 Phase 3 33 23 199 5.0 124.24597 -9.72190 18116 5312070007 ULUWAE NUSA TENGGARA TIMUR 604 Phase 3 140 118 860 25.6 120.89642 -8.64328 18117 5304021001 LAOB NUSA TENGGARA TIMUR 71 Phase 3 20 14 060 3.0 124.33255 -9.70793 18118 5312070007 ULUWAE NUSA TENGGARA TIMUR 364 Phase 3 85 72 165 15.6 120.89231 -8.66341 18119 5304021001 LAOB NUSA TENGGARA TIMUR 33 Phase 3 9 6 327 1.4 124.33618 -9.70664 18120 5312070007 ULUWAE NUSA TENGGARA TIMUR 387 Phase 3 90 76 410 16.5 120.89498 -8.66219 18121 5304021001 LAOB NUSA TENGGARA TIMUR 33 Phase 3 9 6 327 1.4 124.34131 -9.70321 18122 5312070007 ULUWAE NUSA TENGGARA TIMUR 381 Phase 3 89 75 561 16.3 120.89753 -8.66302 18123 5304021001 LAOB NUSA TENGGARA TIMUR 632 Phase 3 172 120 916 26.1 124.35315 -9.69926 18124 5315020024 CUNCA WULANG NUSA TENGGARA TIMUR 80 Phase 3 20 16 980 3.7 120.01949 -8.56791 18125 5306032005 FATURIKA NUSA TENGGARA TIMUR 69 Phase 3 18 12 654 2.7 124.93740 -9.33583 18126 5315020024 CUNCA WULANG NUSA TENGGARA TIMUR 81 Phase 3 21 17 829 3.8 120.00923 -8.57188 18127 5306032005 FATURIKA NUSA TENGGARA TIMUR 136 Phase 3 35 24 605 5.3 124.93880 -9.33749 18128 5315020024 CUNCA WULANG NUSA TENGGARA TIMUR 246 Phase 3 61 51 789 11.2 120.00333 -8.55746 18129 5306032004 MANDEU RAIMANUS NUSA TENGGARA TIMUR 161 Phase 3 35 24 605 5.3 124.93809 -9.34833 18130 5315020024 CUNCA WULANG NUSA TENGGARA TIMUR 348 Phase 3 87 73 863 15.9 119.99736 -8.56044 18131 5306032004 MANDEU RAIMANUS NUSA TENGGARA TIMUR 87 Phase 3 19 13 357 2.9 124.93974 -9.35929 18132 5318030013 UTETOTO NUSA TENGGARA TIMUR 292 Phase 3 68 57 732 12.5 121.39230 -8.71461 18133 5306032003 RENRUA NUSA TENGGARA TIMUR 130 Phase 3 37 26 011 5.6 124.94350 -9.36275 18134 5315030004 REPI NUSA TENGGARA TIMUR 491 Phase 3 92 78 108 16.9 120.20014 -8.81881 18135 5306032003 RENRUA NUSA TENGGARA TIMUR 26 Phase 3 8 5 624 1.2 124.95155 -9.36183 18136 5319040005 BUTI NUSA TENGGARA TIMUR 60 Phase 3 15 12 735 2.7 120.71471 -8.49327 18137 5306032003 RENRUA NUSA TENGGARA TIMUR 115 Phase 3 33 23 199 5.0 124.95393 -9.36192 18138 5319040005 BUTI NUSA TENGGARA TIMUR 77 Phase 3 19 16 131 3.5 120.71094 -8.49254 18139 5306032003 RENRUA NUSA TENGGARA TIMUR 325 Phase 3 92 64 676 14.0 124.96038 -9.36910 18140 5319040005 BUTI NUSA TENGGARA TIMUR 87 Phase 3 21 17 829 3.8 120.71261 -8.48949 18141 5306052001 DUBESI NUSA TENGGARA TIMUR 67 Phase 3 16 11 248 2.4 124.94621 -9.30290 18142 5319040005 BUTI NUSA TENGGARA TIMUR 57 Phase 3 14 11 886 2.6 120.71279 -8.48611 18143 5306052001 DUBESI NUSA TENGGARA TIMUR 23 Phase 3 6 4 218 0.9 124.94837 -9.30147 18144 5319030017 RANA KULAN NUSA TENGGARA TIMUR 612 Phase 3 113 95 937 20.7 120.71692 -8.46883 18145 5306052001 DUBESI NUSA TENGGARA TIMUR 44 Phase 3 11 7 733 1.7 124.94971 -9.30106 18146 5313130002 NENU NUSA TENGGARA TIMUR 156 Phase 3 34 28 866 6.2 120.48849 -8.52881 18147 5306052001 DUBESI NUSA TENGGARA TIMUR 36 Phase 3 9 6 327 1.4 124.95200 -9.30152 18148 5318010006 LOKALABA NUSA TENGGARA TIMUR 71 Phase 3 19 16 131 3.5 121.19651 -8.87295 18149 5306052001 DUBESI NUSA TENGGARA TIMUR 15 Phase 3 4 2 812 0.6 124.95951 -9.31029 18150 5318010006 LOKALABA NUSA TENGGARA TIMUR 84 Phase 3 22 18 678 4.0 121.19432 -8.87143 18151 5306052001 DUBESI NUSA TENGGARA TIMUR 216 Phase 3 52 36 556 7.9 124.95838 -9.31350 18152 5318010006 LOKALABA NUSA TENGGARA TIMUR 57 Phase 3 15 12 735 2.7 121.19481 -8.87713 18153 5306052001 DUBESI NUSA TENGGARA TIMUR 75 Phase 3 18 12 654 2.7 124.96284 -9.31148 18154 5318010006 LOKALABA NUSA TENGGARA TIMUR 32 Phase 3 9 7 641 1.6 121.19526 -8.87743 18155 5306052001 DUBESI NUSA TENGGARA TIMUR 118 Phase 3 29 20 387 4.4 124.96366 -9.31521 18156 5315030011 TANGGE NUSA TENGGARA TIMUR 78 Phase 3 18 15 282 3.3 120.12609 -8.73816 18157 5306052001 DUBESI NUSA TENGGARA TIMUR 146 Phase 3 35 24 605 5.3 124.94866 -9.29077 18158 5315030011 TANGGE NUSA TENGGARA TIMUR 47 Phase 3 11 9 339 2.0 120.12421 -8.73484 18159 5306052002 NANAET NUSA TENGGARA TIMUR 174 Phase 3 42 29 526 6.4 124.95095 -9.28333 Annex II – Demand forecast results Page 96 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 18160 5315030011 TANGGE NUSA TENGGARA TIMUR 50 Phase 3 12 10 188 2.2 120.12711 -8.73125 18161 5303121008 BAUMATA UTARA NUSA TENGGARA TIMUR 245 Phase 3 56 39 368 8.5 123.70590 -10.18690 18162 5315030011 TANGGE NUSA TENGGARA TIMUR 39 Phase 3 9 7 641 1.6 120.12566 -8.72770 18163 5305025007 BANAIN NUSA TENGGARA TIMUR 65 Phase 3 19 13 357 2.9 124.42645 -9.36568 18164 5315030011 TANGGE NUSA TENGGARA TIMUR 305 Phase 3 70 59 430 12.8 120.13055 -8.72570 18165 5304050019 ENO NETTEN NUSA TENGGARA TIMUR 15 Phase 3 5 3 515 0.8 124.25638 -9.95920 18166 5315030015 DALENG NUSA TENGGARA TIMUR 126 Phase 3 34 28 866 6.2 120.19624 -8.68037 18167 5304050019 ENO NETTEN NUSA TENGGARA TIMUR 30 Phase 3 9 6 327 1.4 124.25665 -9.95940 18168 5318060020 TONGGU RAMBANG NUSA TENGGARA TIMUR 210 Phase 3 52 44 148 9.5 121.30033 -8.52142 18169 5306032003 RENRUA NUSA TENGGARA TIMUR 161 Phase 3 46 32 338 7.0 124.93743 -9.36179 18170 5313130013 PERAK NUSA TENGGARA TIMUR 60 Phase 3 15 12 735 2.7 120.50668 -8.46738 18171 5306032004 MANDEU RAIMANUS NUSA TENGGARA TIMUR 129 Phase 3 29 20 387 4.4 124.93516 -9.36015 18172 5313130013 PERAK NUSA TENGGARA TIMUR 84 Phase 3 21 17 829 3.8 120.50383 -8.47145 18173 5306022001 KEREANA NUSA TENGGARA TIMUR 22 Phase 3 8 5 624 1.2 124.93963 -9.49953 18174 5315011001 POTA WANGKA NUSA TENGGARA TIMUR 318 Phase 3 71 60 279 13.0 120.00268 -8.54067 18175 5304021007 USAPIMNASI NUSA TENGGARA TIMUR 20 Phase 3 6 4 218 0.9 124.32755 -9.64608 18176 5315020007 GOLO NDARING NUSA TENGGARA TIMUR 388 Phase 3 82 69 618 15.0 119.99865 -8.64495 18177 5304021006 BIJELI NUSA TENGGARA TIMUR 16 Phase 3 5 3 515 0.8 124.33501 -9.64734 18178 5312080014 LATUNG NUSA TENGGARA TIMUR 19 Phase 3 5 4 245 0.9 121.00568 -8.40585 18179 5304021007 USAPIMNASI NUSA TENGGARA TIMUR 63 Phase 3 18 12 654 2.7 124.34150 -9.64571 18180 5312080014 LATUNG NUSA TENGGARA TIMUR 109 Phase 3 25 21 225 4.6 121.00349 -8.40585 18181 5304021007 USAPIMNASI NUSA TENGGARA TIMUR 91 Phase 3 26 18 278 3.9 124.34288 -9.64071 18182 5312080014 LATUNG NUSA TENGGARA TIMUR 163 Phase 3 37 31 413 6.8 121.00079 -8.40488 18183 5304021005 MNESATBUBAK NUSA TENGGARA TIMUR 159 Phase 3 40 28 120 6.1 124.35964 -9.64243 18184 5312080014 LATUNG NUSA TENGGARA TIMUR 19 Phase 3 5 4 245 0.9 120.99973 -8.40509 18185 5304021005 MNESATBUBAK NUSA TENGGARA TIMUR 413 Phase 3 102 71 706 15.5 124.36591 -9.64520 18186 5312080014 LATUNG NUSA TENGGARA TIMUR 49 Phase 3 12 10 188 2.2 120.99785 -8.40490 18187 5304021005 MNESATBUBAK NUSA TENGGARA TIMUR 120 Phase 3 30 21 090 4.6 124.37232 -9.64628 18188 5312080014 LATUNG NUSA TENGGARA TIMUR 76 Phase 3 18 15 282 3.3 120.99612 -8.40521 18189 5304021005 MNESATBUBAK NUSA TENGGARA TIMUR 24 Phase 3 6 4 218 0.9 124.36486 -9.65149 18190 5319060016 SATAR PUNDA NUSA TENGGARA TIMUR 71 Phase 3 30 25 470 5.5 120.52720 -8.30248 18191 5304021005 MNESATBUBAK NUSA TENGGARA TIMUR 23 Phase 3 6 4 218 0.9 124.36205 -9.65708 18192 5319060013 SATAR PADUT NUSA TENGGARA TIMUR 211 Phase 3 51 43 299 9.3 120.55907 -8.30094 18193 5304021005 MNESATBUBAK NUSA TENGGARA TIMUR 16 Phase 3 4 2 812 0.6 124.36124 -9.65708 18194 5319060013 SATAR PADUT NUSA TENGGARA TIMUR 38 Phase 3 10 8 490 1.8 120.56475 -8.30019 18195 5304021005 MNESATBUBAK NUSA TENGGARA TIMUR 163 Phase 3 41 28 823 6.2 124.35826 -9.65799 18196 5319060013 SATAR PADUT NUSA TENGGARA TIMUR 10 Phase 3 3 2 547 0.5 120.56835 -8.29763 18197 5304021005 MNESATBUBAK NUSA TENGGARA TIMUR 81 Phase 3 20 14 060 3.0 124.36977 -9.66159 18198 5319060013 SATAR PADUT NUSA TENGGARA TIMUR 76 Phase 3 19 16 131 3.5 120.57059 -8.29692 18199 5304021005 MNESATBUBAK NUSA TENGGARA TIMUR 80 Phase 3 20 14 060 3.0 124.37271 -9.66196 18200 5319060013 SATAR PADUT NUSA TENGGARA TIMUR 72 Phase 3 18 15 282 3.3 120.58153 -8.29823 18201 5304021005 MNESATBUBAK NUSA TENGGARA TIMUR 27 Phase 3 7 4 921 1.1 124.37418 -9.65747 18202 5319060013 SATAR PADUT NUSA TENGGARA TIMUR 22 Phase 3 6 5 094 1.1 120.58315 -8.29763 18203 5304021005 MNESATBUBAK NUSA TENGGARA TIMUR 14 Phase 3 4 2 812 0.6 124.37543 -9.65730 18204 5319060013 SATAR PADUT NUSA TENGGARA TIMUR 59 Phase 3 15 12 735 2.7 120.58829 -8.29829 18205 5304021005 MNESATBUBAK NUSA TENGGARA TIMUR 153 Phase 3 38 26 714 5.8 124.37639 -9.65437 18206 5319060013 SATAR PADUT NUSA TENGGARA TIMUR 14 Phase 3 4 3 396 0.7 120.58898 -8.30170 18207 5305061004 TUAMESE NUSA TENGGARA TIMUR 79 Phase 3 20 14 060 3.0 124.73259 -9.06745 18208 5319060013 SATAR PADUT NUSA TENGGARA TIMUR 57 Phase 3 14 11 886 2.6 120.59095 -8.30294 18209 5305061004 TUAMESE NUSA TENGGARA TIMUR 40 Phase 3 11 7 733 1.7 124.72738 -9.06584 18210 5319060013 SATAR PADUT NUSA TENGGARA TIMUR 747 Phase 3 180 152 820 33.0 120.59507 -8.29967 18211 5305061004 TUAMESE NUSA TENGGARA TIMUR 68 Phase 3 18 12 654 2.7 124.72484 -9.06602 18212 5319060013 SATAR PADUT NUSA TENGGARA TIMUR 270 Phase 3 65 55 185 11.9 120.58433 -8.30323 18213 5305061004 TUAMESE NUSA TENGGARA TIMUR 174 Phase 3 44 30 932 6.7 124.72036 -9.07213 18214 5319060013 SATAR PADUT NUSA TENGGARA TIMUR 274 Phase 3 66 56 034 12.1 120.60046 -8.30580 18215 5305061004 TUAMESE NUSA TENGGARA TIMUR 134 Phase 3 34 23 902 5.2 124.70409 -9.06870 18216 5315010007 GOLO PONGKOR NUSA TENGGARA TIMUR 288 Phase 3 71 60 279 13.0 119.89898 -8.58807 18217 5305061004 TUAMESE NUSA TENGGARA TIMUR 450 Phase 3 114 80 142 17.3 124.70066 -9.07473 18218 5311060022 AEWORA NUSA TENGGARA TIMUR 189 Phase 3 45 38 205 8.2 121.88974 -8.50528 18219 5305061004 TUAMESE NUSA TENGGARA TIMUR 123 Phase 3 31 21 793 4.7 124.69461 -9.07757 18220 5313140009 RUIS NUSA TENGGARA TIMUR 154 Phase 3 36 30 564 6.6 120.44974 -8.33319 18221 5303180008 LELOBOKO NUSA TENGGARA TIMUR 478 Phase 3 95 66 785 14.4 123.92024 -9.70680 18222 5315050001 LOHA NUSA TENGGARA TIMUR 157 Phase 3 37 31 413 6.8 120.13569 -8.52913 18223 5305026001 SUNSEA NUSA TENGGARA TIMUR 114 Phase 3 27 18 981 4.1 124.45553 -9.31469 18224 5315050001 LOHA NUSA TENGGARA TIMUR 110 Phase 3 26 22 074 4.8 120.13527 -8.53075 18225 5305026001 SUNSEA NUSA TENGGARA TIMUR 354 Phase 3 83 58 349 12.6 124.45771 -9.31017 18226 5315011004 GOLO LUJANG NUSA TENGGARA TIMUR 225 Phase 3 51 43 299 9.3 120.13116 -8.52306 18227 5303170007 TANINI NUSA TENGGARA TIMUR 131 Phase 3 34 23 902 5.2 123.97701 -9.81982 18228 5315011004 GOLO LUJANG NUSA TENGGARA TIMUR 317 Phase 3 72 61 128 13.2 120.13218 -8.52150 18229 5303170007 TANINI NUSA TENGGARA TIMUR 305 Phase 3 77 54 131 11.7 123.97841 -9.81278 18230 5311050036 LIKANAKA NUSA TENGGARA TIMUR 113 Phase 3 29 24 621 5.3 121.90295 -8.73854 18231 5304013003 NUNBENA NUSA TENGGARA TIMUR 14 Phase 3 4 2 812 0.6 124.14534 -9.67351 18232 5315011001 POTA WANGKA NUSA TENGGARA TIMUR 218 Phase 3 49 41 601 9.0 120.00072 -8.52305 18233 5304013003 NUNBENA NUSA TENGGARA TIMUR 54 Phase 3 14 9 842 2.1 124.14370 -9.67417 18234 5315011001 POTA WANGKA NUSA TENGGARA TIMUR 93 Phase 3 21 17 829 3.8 120.00285 -8.51824 18235 5304102006 HOINENO NUSA TENGGARA TIMUR 81 Phase 3 20 14 060 3.0 124.69004 -9.85980 18236 5315011001 POTA WANGKA NUSA TENGGARA TIMUR 182 Phase 3 41 34 809 7.5 120.00905 -8.51615 18237 5304102006 HOINENO NUSA TENGGARA TIMUR 126 Phase 3 31 21 793 4.7 124.68616 -9.85192 18238 5315011001 POTA WANGKA NUSA TENGGARA TIMUR 88 Phase 3 20 16 980 3.7 120.00934 -8.51515 18239 5304102006 HOINENO NUSA TENGGARA TIMUR 97 Phase 3 24 16 872 3.6 124.68704 -9.84996 18240 5315011001 POTA WANGKA NUSA TENGGARA TIMUR 112 Phase 3 25 21 225 4.6 120.00970 -8.53948 18241 5303190010 KOLABE NUSA TENGGARA TIMUR 52 Phase 3 13 9 139 2.0 123.87548 -9.49759 18242 5315011001 POTA WANGKA NUSA TENGGARA TIMUR 126 Phase 3 28 23 772 5.1 120.01721 -8.54268 18243 5304082004 NUNFUTU NUSA TENGGARA TIMUR 88 Phase 3 19 13 357 2.9 124.62373 -9.61085 18244 5315011001 POTA WANGKA NUSA TENGGARA TIMUR 154 Phase 3 35 29 715 6.4 120.02013 -8.55110 Annex II – Demand forecast results Page 97 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 18245 5304082004 NUNFUTU NUSA TENGGARA TIMUR 167 Phase 3 36 25 308 5.5 124.62578 -9.60872 18246 5310012012 BU WATUWETI NUSA TENGGARA TIMUR 35 Phase 3 10 8 490 1.8 121.96519 -8.70178 18247 5304082004 NUNFUTU NUSA TENGGARA TIMUR 141 Phase 3 31 21 793 4.7 124.63160 -9.60372 18248 5310012012 BU WATUWETI NUSA TENGGARA TIMUR 140 Phase 3 40 33 960 7.3 121.96023 -8.70448 18249 5304082004 NUNFUTU NUSA TENGGARA TIMUR 170 Phase 3 37 26 011 5.6 124.63746 -9.60198 18250 5310012013 LOKE NUSA TENGGARA TIMUR 56 Phase 3 9 7 641 1.6 121.97156 -8.69477 18251 5306011008 WEKEKE NUSA TENGGARA TIMUR 664 Phase 3 154 108 262 23.4 124.65095 -9.59291 18252 5310012013 LOKE NUSA TENGGARA TIMUR 130 Phase 3 21 17 829 3.8 121.97260 -8.69541 18253 5304082004 NUNFUTU NUSA TENGGARA TIMUR 137 Phase 3 30 21 090 4.6 124.63247 -9.59595 18254 5310012013 LOKE NUSA TENGGARA TIMUR 115 Phase 3 19 16 131 3.5 121.97031 -8.69285 18255 5304051003 OEPLIKI NUSA TENGGARA TIMUR 51 Phase 3 14 9 842 2.1 124.32695 -9.98928 18256 5313140007 WATU TANGO NUSA TENGGARA TIMUR 204 Phase 3 46 39 054 8.4 120.44195 -8.39990 18257 5304013003 NUNBENA NUSA TENGGARA TIMUR 48 Phase 3 12 8 436 1.8 124.13167 -9.67207 18258 5312080014 LATUNG NUSA TENGGARA TIMUR 171 Phase 3 39 33 111 7.1 120.99331 -8.40421 18259 5304013003 NUNBENA NUSA TENGGARA TIMUR 54 Phase 3 14 9 842 2.1 124.12718 -9.67210 18260 5318030002 PODENURA NUSA TENGGARA TIMUR 55 Phase 3 14 11 886 2.6 121.36717 -8.87941 18261 5304013001 NOEBESI NUSA TENGGARA TIMUR 639 Phase 3 153 107 559 23.2 124.09656 -9.65288 18262 5311052002 KEL. WATUNESO NUSA TENGGARA TIMUR 30 Phase 3 9 7 641 1.6 121.95752 -8.78668 18263 5304013001 NOEBESI NUSA TENGGARA TIMUR 333 Phase 3 80 56 240 12.1 124.09245 -9.64590 18264 5311052001 HOBATUWA NUSA TENGGARA TIMUR 108 Phase 3 26 22 074 4.8 121.95774 -8.78737 18265 5304013004 TANEOTOP NUSA TENGGARA TIMUR 926 Phase 3 248 174 344 37.6 124.11161 -9.58462 18266 5315010007 GOLO PONGKOR NUSA TENGGARA TIMUR 293 Phase 3 72 61 128 13.2 119.88770 -8.58967 18267 5306081008 SISI FATUBERAL NUSA TENGGARA TIMUR 91 Phase 3 19 13 357 2.9 125.08547 -9.15232 18268 5318060001 TEDAMUDE NUSA TENGGARA TIMUR 55 Phase 3 12 10 188 2.2 121.14723 -8.55962 18269 5306081008 SISI FATUBERAL NUSA TENGGARA TIMUR 45 Phase 3 9 6 327 1.4 125.08407 -9.15405 18270 5318060001 TEDAMUDE NUSA TENGGARA TIMUR 99 Phase 3 21 17 829 3.8 121.14873 -8.55965 18271 5306081008 SISI FATUBERAL NUSA TENGGARA TIMUR 87 Phase 3 18 12 654 2.7 125.08462 -9.15530 18272 5318060001 TEDAMUDE NUSA TENGGARA TIMUR 118 Phase 3 25 21 225 4.6 121.15040 -8.55811 18273 5306081008 SISI FATUBERAL NUSA TENGGARA TIMUR 38 Phase 3 8 5 624 1.2 125.08374 -9.15616 18274 5318060001 TEDAMUDE NUSA TENGGARA TIMUR 214 Phase 3 45 38 205 8.2 121.15135 -8.56119 18275 5306081002 LUTHA RATO NUSA TENGGARA TIMUR 280 Phase 3 82 57 646 12.4 125.08981 -9.17445 18276 5318060001 TEDAMUDE NUSA TENGGARA TIMUR 131 Phase 3 28 23 772 5.1 121.15317 -8.55987 18277 5303100007 UITAO NUSA TENGGARA TIMUR 102 Phase 3 27 18 981 4.1 123.41832 -10.18289 18278 5318060001 TEDAMUDE NUSA TENGGARA TIMUR 155 Phase 3 33 28 017 6.0 121.17005 -8.57725 18279 5303181001 MANUBELON NUSA TENGGARA TIMUR 76 Phase 3 15 10 545 2.3 123.68715 -9.68049 18280 5318060002 TEDAKISA NUSA TENGGARA TIMUR 789 Phase 3 174 147 726 31.9 121.18095 -8.59048 18281 5303181001 MANUBELON NUSA TENGGARA TIMUR 95 Phase 3 19 13 357 2.9 123.69113 -9.68204 18282 5311070028 RANDORIA NUSA TENGGARA TIMUR 122 Phase 3 37 31 413 6.8 121.69905 -8.77644 18283 5303181001 MANUBELON NUSA TENGGARA TIMUR 46 Phase 3 10 7 030 1.5 123.69466 -9.68316 18284 5310011005 GERA NUSA TENGGARA TIMUR 95 Phase 3 25 21 225 4.6 122.07166 -8.65078 18285 5303181001 MANUBELON NUSA TENGGARA TIMUR 49 Phase 3 10 7 030 1.5 123.69373 -9.68478 18286 5310011005 GERA NUSA TENGGARA TIMUR 182 Phase 3 48 40 752 8.8 122.06525 -8.65317 18287 5303181001 MANUBELON NUSA TENGGARA TIMUR 241 Phase 3 48 33 744 7.3 123.68841 -9.69655 18288 5313041008 HILIHINTIR NUSA TENGGARA TIMUR 140 Phase 3 29 24 621 5.3 120.35314 -8.77008 18289 5303181001 MANUBELON NUSA TENGGARA TIMUR 534 Phase 3 106 74 518 16.1 123.68919 -9.70467 18290 5313041008 HILIHINTIR NUSA TENGGARA TIMUR 188 Phase 3 38 32 262 7.0 120.35913 -8.77607 18291 5304072002 PENE UTARA NUSA TENGGARA TIMUR 24 Phase 3 7 4 921 1.1 124.41587 -9.78637 18292 5319010014 GOLO MELENG NUSA TENGGARA TIMUR 36 Phase 3 7 5 943 1.3 120.58248 -8.69876 18293 5304080016 SINI NUSA TENGGARA TIMUR 331 Phase 3 109 76 627 16.5 124.53568 -9.74217 18294 5319010015 GOLO RUTUK NUSA TENGGARA TIMUR 160 Phase 3 31 26 319 5.7 120.58274 -8.69190 18295 5304010017 FATUKOTO NUSA TENGGARA TIMUR 247 Phase 3 55 38 665 8.3 124.23622 -9.72128 18296 5319010014 GOLO MELENG NUSA TENGGARA TIMUR 91 Phase 3 18 15 282 3.3 120.58252 -8.70049 18297 5306013012 ANGKAES NUSA TENGGARA TIMUR 154 Phase 3 36 25 308 5.5 124.88085 -9.59524 18298 5319010014 GOLO MELENG NUSA TENGGARA TIMUR 96 Phase 3 19 16 131 3.5 120.58467 -8.70308 18299 5306013012 ANGKAES NUSA TENGGARA TIMUR 67 Phase 3 16 11 248 2.4 124.88370 -9.59353 18300 5319010014 GOLO MELENG NUSA TENGGARA TIMUR 257 Phase 3 50 42 450 9.2 120.58590 -8.70614 18301 5303170009 TUAPANAF NUSA TENGGARA TIMUR 120 Phase 3 30 21 090 4.6 124.07535 -9.90122 18302 5319060005 COMPANG DERU NUSA TENGGARA TIMUR 113 Phase 3 26 22 074 4.8 120.56216 -8.43033 18303 5303170005 KAUNIKI NUSA TENGGARA TIMUR 184 Phase 3 41 28 823 6.2 124.08255 -9.89523 18304 5319060005 COMPANG DERU NUSA TENGGARA TIMUR 109 Phase 3 25 21 225 4.6 120.55882 -8.42708 18305 5303170005 KAUNIKI NUSA TENGGARA TIMUR 82 Phase 3 18 12 654 2.7 124.08431 -9.89273 18306 5319060005 COMPANG DERU NUSA TENGGARA TIMUR 166 Phase 3 38 32 262 7.0 120.55061 -8.42286 18307 5303170005 KAUNIKI NUSA TENGGARA TIMUR 72 Phase 3 16 11 248 2.4 124.08440 -9.88916 18308 5319060007 GOLO MUNGA NUSA TENGGARA TIMUR 63 Phase 3 16 13 584 2.9 120.55016 -8.41005 18309 5303170005 KAUNIKI NUSA TENGGARA TIMUR 378 Phase 3 83 58 349 12.6 124.08757 -9.88626 18310 5319060007 GOLO MUNGA NUSA TENGGARA TIMUR 52 Phase 3 14 11 886 2.6 120.54254 -8.40831 18311 5303170006 OELNAINENO NUSA TENGGARA TIMUR 136 Phase 3 32 22 496 4.9 123.96152 -9.80720 18312 5319060007 GOLO MUNGA NUSA TENGGARA TIMUR 279 Phase 3 71 60 279 13.0 120.53365 -8.40584 18313 5303170006 OELNAINENO NUSA TENGGARA TIMUR 16 Phase 3 4 2 812 0.6 123.95833 -9.80678 18314 5319060007 GOLO MUNGA NUSA TENGGARA TIMUR 270 Phase 3 69 58 581 12.6 120.52880 -8.41567 18315 5303170006 OELNAINENO NUSA TENGGARA TIMUR 18 Phase 3 5 3 515 0.8 123.95709 -9.80670 18316 5319060007 GOLO MUNGA NUSA TENGGARA TIMUR 132 Phase 3 34 28 866 6.2 120.53412 -8.39819 18317 5303170006 OELNAINENO NUSA TENGGARA TIMUR 67 Phase 3 16 11 248 2.4 123.95384 -9.80435 18318 5319060014 NAMPAR TABANG NUSA TENGGARA TIMUR 439 Phase 3 97 82 353 17.8 120.54871 -8.38025 18319 5303170006 OELNAINENO NUSA TENGGARA TIMUR 246 Phase 3 57 40 071 8.6 123.94176 -9.79336 18320 5319060007 GOLO MUNGA NUSA TENGGARA TIMUR 226 Phase 3 57 48 393 10.4 120.51816 -8.40292 18321 5303170007 TANINI NUSA TENGGARA TIMUR 8 Phase 3 3 2 109 0.5 123.94126 -9.79133 18322 5310012014 RENGGARASI NUSA TENGGARA TIMUR 37 Phase 3 8 6 792 1.5 122.00048 -8.71206 18323 5303170006 OELNAINENO NUSA TENGGARA TIMUR 13 Phase 3 4 2 812 0.6 123.94219 -9.78996 18324 5315010007 GOLO PONGKOR NUSA TENGGARA TIMUR 205 Phase 3 51 43 299 9.3 119.88604 -8.58669 18325 5303170007 TANINI NUSA TENGGARA TIMUR 8 Phase 3 3 2 109 0.5 123.94228 -9.78967 18326 5313121016 WAE MULU NUSA TENGGARA TIMUR 140 Phase 3 32 27 168 5.9 120.44978 -8.53291 18327 5303170006 OELNAINENO NUSA TENGGARA TIMUR 66 Phase 3 16 11 248 2.4 123.94429 -9.78701 18328 5315020007 GOLO NDARING NUSA TENGGARA TIMUR 249 Phase 3 53 44 997 9.7 119.98445 -8.64600 18329 5303170007 TANINI NUSA TENGGARA TIMUR 216 Phase 3 55 38 665 8.3 123.94501 -9.78554 Annex II – Demand forecast results Page 98 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 18330 5315020007 GOLO NDARING NUSA TENGGARA TIMUR 197 Phase 3 42 35 658 7.7 119.98598 -8.65617 18331 5304111006 TUATAUM NUSA TENGGARA TIMUR 78 Phase 3 22 15 466 3.3 124.79719 -9.68972 18332 5315020007 GOLO NDARING NUSA TENGGARA TIMUR 186 Phase 3 40 33 960 7.3 119.99129 -8.65730 18333 5304111006 TUATAUM NUSA TENGGARA TIMUR 91 Phase 3 26 18 278 3.9 124.79072 -9.68540 18334 5315020003 SANO NGGOANG NUSA TENGGARA TIMUR 558 Phase 3 120 101 880 22.0 119.98166 -8.67074 18335 5304111006 TUATAUM NUSA TENGGARA TIMUR 138 Phase 3 39 27 417 5.9 124.78795 -9.67975 18336 5315020002 WAE SANO NUSA TENGGARA TIMUR 102 Phase 3 24 20 376 4.4 119.99957 -8.68805 18337 5304042006 OOF NUSA TENGGARA TIMUR 148 Phase 3 32 22 496 4.9 124.35539 -9.80462 18338 5315020003 SANO NGGOANG NUSA TENGGARA TIMUR 243 Phase 3 52 44 148 9.5 119.98717 -8.69708 18339 5304042006 OOF NUSA TENGGARA TIMUR 27 Phase 3 6 4 218 0.9 124.35766 -9.80852 18340 5315020003 SANO NGGOANG NUSA TENGGARA TIMUR 350 Phase 3 75 63 675 13.7 119.97729 -8.71850 18341 5304042006 OOF NUSA TENGGARA TIMUR 9 Phase 3 2 1 406 0.3 124.35839 -9.80853 18342 5315020003 SANO NGGOANG NUSA TENGGARA TIMUR 382 Phase 3 82 69 618 15.0 119.98009 -8.73167 18343 5304042006 OOF NUSA TENGGARA TIMUR 141 Phase 3 30 21 090 4.6 124.36215 -9.81194 18344 5315020002 WAE SANO NUSA TENGGARA TIMUR 35 Phase 3 9 7 641 1.6 119.99984 -8.72666 18345 5304042006 OOF NUSA TENGGARA TIMUR 168 Phase 3 36 25 308 5.5 124.35887 -9.81669 18346 5315020002 WAE SANO NUSA TENGGARA TIMUR 67 Phase 3 16 13 584 2.9 120.00027 -8.72623 18347 5304042006 OOF NUSA TENGGARA TIMUR 69 Phase 3 15 10 545 2.3 124.36545 -9.81425 18348 5315020002 WAE SANO NUSA TENGGARA TIMUR 581 Phase 3 135 114 615 24.7 120.00343 -8.72087 18349 5304042006 OOF NUSA TENGGARA TIMUR 59 Phase 3 13 9 139 2.0 124.36605 -9.81577 18350 5315020002 WAE SANO NUSA TENGGARA TIMUR 136 Phase 3 32 27 168 5.9 120.00200 -8.71857 18351 5303100011 BATUINAN NUSA TENGGARA TIMUR 215 Phase 3 63 44 289 9.6 123.39149 -10.15504 18352 5315030002 BENTENG DEWA NUSA TENGGARA TIMUR 1 462 Phase 3 329 279 321 60.3 120.03188 -8.77195 18353 5304100015 TOI NUSA TENGGARA TIMUR 105 Phase 3 27 18 981 4.1 124.58407 -9.81895 18354 5315020003 SANO NGGOANG NUSA TENGGARA TIMUR 149 Phase 3 32 27 168 5.9 119.96951 -8.72224 18355 5304100015 TOI NUSA TENGGARA TIMUR 68 Phase 3 18 12 654 2.7 124.58433 -9.81925 18356 5311031002 KEL. REWARANGGA NUSA TENGGARA TIMUR 73 Phase 3 15 12 735 2.7 121.65179 -8.77058 18357 5303170007 TANINI NUSA TENGGARA TIMUR 41 Phase 3 11 7 733 1.7 123.91510 -9.80784 18358 5311020005 RANDOTONDA NUSA TENGGARA TIMUR 123 Phase 3 36 30 564 6.6 121.65111 -8.77073 18359 5303170007 TANINI NUSA TENGGARA TIMUR 126 Phase 3 32 22 496 4.9 123.91363 -9.80699 18360 5315011001 POTA WANGKA NUSA TENGGARA TIMUR 177 Phase 3 40 33 960 7.3 119.98308 -8.50744 18361 5303170007 TANINI NUSA TENGGARA TIMUR 140 Phase 3 36 25 308 5.5 123.91102 -9.80757 18362 5315011009 TANJUNG BOLENG NUSA TENGGARA TIMUR 149 Phase 3 34 28 866 6.2 119.98841 -8.47995 18363 5303170007 TANINI NUSA TENGGARA TIMUR 87 Phase 3 22 15 466 3.3 123.90775 -9.80892 18364 5315011009 TANJUNG BOLENG NUSA TENGGARA TIMUR 68 Phase 3 16 13 584 2.9 119.99361 -8.47597 18365 5303170007 TANINI NUSA TENGGARA TIMUR 675 Phase 3 171 120 213 25.9 123.90203 -9.80716 18366 5315011009 TANJUNG BOLENG NUSA TENGGARA TIMUR 299 Phase 3 68 57 732 12.5 119.98960 -8.47352 18367 5303190009 FATUNAUS NUSA TENGGARA TIMUR 6 Phase 3 2 1 406 0.3 123.87855 -9.49992 18368 5315011009 TANJUNG BOLENG NUSA TENGGARA TIMUR 300 Phase 3 68 57 732 12.5 119.99418 -8.46129 18369 5303190009 FATUNAUS NUSA TENGGARA TIMUR 152 Phase 3 36 25 308 5.5 123.87843 -9.50035 18370 5315011008 BATU TIGA NUSA TENGGARA TIMUR 497 Phase 3 128 108 672 23.4 119.99391 -8.43853 18371 5304010005 LELOBATAN NUSA TENGGARA TIMUR 86 Phase 3 20 14 060 3.0 124.21949 -9.72941 18372 5315011009 TANJUNG BOLENG NUSA TENGGARA TIMUR 194 Phase 3 44 37 356 8.1 120.00583 -8.46086 18373 5304010005 LELOBATAN NUSA TENGGARA TIMUR 229 Phase 3 53 37 259 8.0 124.21972 -9.73651 18374 5315011009 TANJUNG BOLENG NUSA TENGGARA TIMUR 295 Phase 3 67 56 883 12.3 120.01550 -8.44844 18375 5304010005 LELOBATAN NUSA TENGGARA TIMUR 36 Phase 3 9 6 327 1.4 124.21474 -9.74056 18376 5315011009 TANJUNG BOLENG NUSA TENGGARA TIMUR 742 Phase 3 167 141 783 30.6 119.95159 -8.45581 18377 5304010005 LELOBATAN NUSA TENGGARA TIMUR 67 Phase 3 16 11 248 2.4 124.21595 -9.74170 18378 5315010008 MACANG TANGGAR NUSA TENGGARA TIMUR 140 Phase 3 32 27 168 5.9 119.87613 -8.57901 18379 5304010005 LELOBATAN NUSA TENGGARA TIMUR 227 Phase 3 52 36 556 7.9 124.21386 -9.74296 18380 5315010008 MACANG TANGGAR NUSA TENGGARA TIMUR 13 Phase 3 3 2 547 0.5 119.87491 -8.57893 18381 5306030005 NUMPONI NUSA TENGGARA TIMUR 139 Phase 3 33 23 199 5.0 124.90486 -9.45611 18382 5315010008 MACANG TANGGAR NUSA TENGGARA TIMUR 79 Phase 3 18 15 282 3.3 119.87397 -8.57904 18383 5304023003 KUALEU NUSA TENGGARA TIMUR 24 Phase 3 6 4 218 0.9 124.30954 -9.75348 18384 5315010008 MACANG TANGGAR NUSA TENGGARA TIMUR 187 Phase 3 42 35 658 7.7 119.86922 -8.58834 18385 5304023006 PIKA NUSA TENGGARA TIMUR 28 Phase 3 7 4 921 1.1 124.31373 -9.76016 18386 5315010008 MACANG TANGGAR NUSA TENGGARA TIMUR 188 Phase 3 43 36 507 7.9 119.87039 -8.59133 18387 5304023006 PIKA NUSA TENGGARA TIMUR 341 Phase 3 82 57 646 12.4 124.31832 -9.75995 18388 5315010006 TIWU NAMPAR NUSA TENGGARA TIMUR 1 076 Phase 3 258 219 042 47.3 119.85861 -8.60252 18389 5304023006 PIKA NUSA TENGGARA TIMUR 40 Phase 3 10 7 030 1.5 124.32112 -9.76180 18390 5315010008 MACANG TANGGAR NUSA TENGGARA TIMUR 222 Phase 3 50 42 450 9.2 119.85053 -8.59088 18391 5304023006 PIKA NUSA TENGGARA TIMUR 88 Phase 3 21 14 763 3.2 124.32390 -9.76050 18392 5315010008 MACANG TANGGAR NUSA TENGGARA TIMUR 146 Phase 3 33 28 017 6.0 119.84335 -8.59454 18393 5304010005 LELOBATAN NUSA TENGGARA TIMUR 62 Phase 3 15 10 545 2.3 124.21374 -9.74535 18394 5315010008 MACANG TANGGAR NUSA TENGGARA TIMUR 145 Phase 3 33 28 017 6.0 119.84333 -8.59741 18395 5304010005 LELOBATAN NUSA TENGGARA TIMUR 279 Phase 3 64 44 992 9.7 124.21220 -9.74531 18396 5315010005 WARLOKA NUSA TENGGARA TIMUR 96 Phase 3 24 20 376 4.4 119.83565 -8.60618 18397 5304010005 LELOBATAN NUSA TENGGARA TIMUR 222 Phase 3 51 35 853 7.7 124.20506 -9.73997 18398 5315010005 WARLOKA NUSA TENGGARA TIMUR 37 Phase 3 10 8 490 1.8 119.83676 -8.60852 18399 5304010005 LELOBATAN NUSA TENGGARA TIMUR 82 Phase 3 19 13 357 2.9 124.20263 -9.74018 18400 5315010005 WARLOKA NUSA TENGGARA TIMUR 348 Phase 3 87 73 863 15.9 119.84070 -8.61826 18401 5304012003 TUNE NUSA TENGGARA TIMUR 56 Phase 3 15 10 545 2.3 124.30699 -9.62404 18402 5315010005 WARLOKA NUSA TENGGARA TIMUR 98 Phase 3 25 21 225 4.6 119.84653 -8.61890 18403 5306021003 MANULEA NUSA TENGGARA TIMUR 52 Phase 3 11 7 733 1.7 124.85608 -9.51659 18404 5315010005 WARLOKA NUSA TENGGARA TIMUR 143 Phase 3 36 30 564 6.6 119.84686 -8.61719 18405 5306021003 MANULEA NUSA TENGGARA TIMUR 243 Phase 3 52 36 556 7.9 124.86275 -9.51667 18406 5315010005 WARLOKA NUSA TENGGARA TIMUR 137 Phase 3 35 29 715 6.4 119.84942 -8.61708 18407 5303133004 ENORAEN NUSA TENGGARA TIMUR 167 Phase 3 47 33 041 7.1 124.07641 -10.16815 18408 5315010005 WARLOKA NUSA TENGGARA TIMUR 373 Phase 3 93 78 957 17.0 119.80932 -8.60116 18409 5305052006 OEPUAH UTARA NUSA TENGGARA TIMUR 64 Phase 3 15 10 545 2.3 124.59764 -9.17069 18410 5315010005 WARLOKA NUSA TENGGARA TIMUR 67 Phase 3 17 14 433 3.1 119.80835 -8.61063 18411 5305052006 OEPUAH UTARA NUSA TENGGARA TIMUR 211 Phase 3 47 33 041 7.1 124.59161 -9.16921 18412 5315010003 PASIR PANJANG NUSA TENGGARA TIMUR 1 041 Phase 3 248 210 552 45.4 119.78554 -8.61994 18413 5305052004 KAUBELE NUSA TENGGARA TIMUR 83 Phase 3 22 15 466 3.3 124.60659 -9.22328 18414 5311060023 OTOGEDU NUSA TENGGARA TIMUR 22 Phase 3 7 5 943 1.3 121.84144 -8.54897 Annex II – Demand forecast results Page 99 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 18415 5305052004 KAUBELE NUSA TENGGARA TIMUR 37 Phase 3 10 7 030 1.5 124.60979 -9.22234 18416 5311060023 OTOGEDU NUSA TENGGARA TIMUR 207 Phase 3 60 50 940 11.0 121.84314 -8.55061 18417 5305052004 KAUBELE NUSA TENGGARA TIMUR 139 Phase 3 36 25 308 5.5 124.61838 -9.21884 18418 5315050003 GOLO LAJANG NUSA TENGGARA TIMUR 86 Phase 3 19 16 131 3.5 120.20932 -8.50932 18419 5305052004 KAUBELE NUSA TENGGARA TIMUR 32 Phase 3 9 6 327 1.4 124.60991 -9.22988 18420 5315010005 WARLOKA NUSA TENGGARA TIMUR 33 Phase 3 9 7 641 1.6 119.85032 -8.61468 18421 5305052004 KAUBELE NUSA TENGGARA TIMUR 187 Phase 3 48 33 744 7.3 124.61188 -9.23375 18422 5311063005 NDENGGARONGGE NUSA TENGGARA TIMUR 89 Phase 3 22 18 678 4.0 121.87258 -8.70765 18423 5306032003 RENRUA NUSA TENGGARA TIMUR 54 Phase 3 16 11 248 2.4 124.93311 -9.36873 18424 5311063004 KURU NUSA TENGGARA TIMUR 40 Phase 3 11 9 339 2.0 121.87785 -8.69887 18425 5306032003 RENRUA NUSA TENGGARA TIMUR 138 Phase 3 39 27 417 5.9 124.93392 -9.37364 18426 5311063006 TANALANGI NUSA TENGGARA TIMUR 125 Phase 3 29 24 621 5.3 121.88091 -8.69323 18427 5304012004 BONLEU NUSA TENGGARA TIMUR 233 Phase 3 59 41 477 8.9 124.31020 -9.60897 18428 5311063006 TANALANGI NUSA TENGGARA TIMUR 237 Phase 3 55 46 695 10.1 121.87570 -8.68990 18429 5305043003 MAUBESI NUSA TENGGARA TIMUR 446 Phase 3 105 73 815 15.9 124.54329 -9.40995 18430 5315030012 SIRU NUSA TENGGARA TIMUR 215 Phase 3 47 39 903 8.6 120.16485 -8.69370 18431 5304080010 NIFUKIU NUSA TENGGARA TIMUR 25 Phase 3 7 4 921 1.1 124.66165 -9.67055 18432 5319060013 SATAR PADUT NUSA TENGGARA TIMUR 63 Phase 3 16 13 584 2.9 120.58313 -8.31245 18433 5304080010 NIFUKIU NUSA TENGGARA TIMUR 99 Phase 3 27 18 981 4.1 124.66586 -9.67813 18434 5319060013 SATAR PADUT NUSA TENGGARA TIMUR 117 Phase 3 29 24 621 5.3 120.58105 -8.31708 18435 5304110009 TUMU NUSA TENGGARA TIMUR 241 Phase 3 65 45 695 9.9 124.67027 -9.67408 18436 5319060013 SATAR PADUT NUSA TENGGARA TIMUR 129 Phase 3 31 26 319 5.7 120.58796 -8.31961 18437 5304010014 HALME NUSA TENGGARA TIMUR 220 Phase 3 73 51 319 11.1 124.12458 -9.72906 18438 5318030002 PODENURA NUSA TENGGARA TIMUR 55 Phase 3 14 11 886 2.6 121.36529 -8.87673 18439 5306040009 BABULU NUSA TENGGARA TIMUR 107 Phase 3 26 18 278 3.9 124.98751 -9.41243 18440 5312080015 SAMBINASI NUSA TENGGARA TIMUR 47 Phase 3 12 10 188 2.2 120.99218 -8.40366 18441 5306040009 BABULU NUSA TENGGARA TIMUR 177 Phase 3 43 30 229 6.5 124.98991 -9.40968 18442 5319050010 NGKIONG DORA NUSA TENGGARA TIMUR 116 Phase 3 28 23 772 5.1 120.66986 -8.54928 18443 5305052006 OEPUAH UTARA NUSA TENGGARA TIMUR 218 Phase 3 48 33 744 7.3 124.58811 -9.16619 18444 5311063006 TANALANGI NUSA TENGGARA TIMUR 7 Phase 3 2 1 698 0.4 121.87493 -8.68912 18445 5305022008 TUBLOPO NUSA TENGGARA TIMUR 92 Phase 3 23 16 169 3.5 124.56240 -9.52457 18446 5311063004 KURU NUSA TENGGARA TIMUR 53 Phase 3 14 11 886 2.6 121.86850 -8.68136 18447 5303131003 ERBAUN NUSA TENGGARA TIMUR 137 Phase 3 40 28 120 6.1 123.75077 -10.31162 18448 5311063004 KURU NUSA TENGGARA TIMUR 31 Phase 3 9 7 641 1.6 121.86462 -8.68485 18449 5303131003 ERBAUN NUSA TENGGARA TIMUR 16 Phase 3 5 3 515 0.8 123.75019 -10.30987 18450 5311063004 KURU NUSA TENGGARA TIMUR 122 Phase 3 32 27 168 5.9 121.85237 -8.69148 18451 5303131003 ERBAUN NUSA TENGGARA TIMUR 132 Phase 3 38 26 714 5.8 123.74915 -10.31017 18452 5311063002 NGGUMBELAKA NUSA TENGGARA TIMUR 354 Phase 3 101 85 749 18.5 121.85016 -8.68825 18453 5304010008 EON BESI NUSA TENGGARA TIMUR 47 Phase 3 11 7 733 1.7 124.28987 -9.75280 18454 5311063004 KURU NUSA TENGGARA TIMUR 107 Phase 3 28 23 772 5.1 121.87105 -8.67604 18455 5303142002 FATUKNUTU NUSA TENGGARA TIMUR 235 Phase 3 61 42 883 9.3 123.91428 -10.18110 18456 5318020009 KELI NUSA TENGGARA TIMUR 25 Phase 3 6 5 094 1.1 121.25119 -8.89029 18457 5305027004 KUAKEN NUSA TENGGARA TIMUR 187 Phase 3 54 37 962 8.2 124.55408 -9.57114 18458 5315040018 TENGKU NUSA TENGGARA TIMUR 21 Phase 3 5 4 245 0.9 120.24339 -8.57032 18459 5303170010 FATUKONA NUSA TENGGARA TIMUR 263 Phase 3 53 37 259 8.0 124.00257 -9.92732 18460 5313130023 WAE RENCA NUSA TENGGARA TIMUR 196 Phase 3 45 38 205 8.2 120.46978 -8.41605 18461 5304101013 BAUS NUSA TENGGARA TIMUR 50 Phase 3 15 10 545 2.3 124.76279 -9.79169 18462 5319060002 COMPANG NECAK NUSA TENGGARA TIMUR 70 Phase 3 20 16 980 3.7 120.62179 -8.49645 18463 5306080012 KEWAR NUSA TENGGARA TIMUR 29 Phase 3 9 6 327 1.4 125.16048 -9.09363 18464 5312080014 LATUNG NUSA TENGGARA TIMUR 174 Phase 3 40 33 960 7.3 120.99531 -8.39808 18465 5303180010 OELBANU NUSA TENGGARA TIMUR 366 Phase 3 82 57 646 12.4 123.90672 -9.70765 18466 5311010008 KERIREA NUSA TENGGARA TIMUR 99 Phase 3 24 20 376 4.4 121.48141 -8.75428 18467 5306040009 BABULU NUSA TENGGARA TIMUR 115 Phase 3 28 19 684 4.2 124.94049 -9.44062 18468 5311010015 NDETUREA NUSA TENGGARA TIMUR 24 Phase 3 7 5 943 1.3 121.48172 -8.75451 18469 5306032004 MANDEU RAIMANUS NUSA TENGGARA TIMUR 88 Phase 3 20 14 060 3.0 124.92268 -9.36464 18470 5311010002 KEL. NDORUREA NUSA TENGGARA TIMUR 63 Phase 3 19 16 131 3.5 121.48133 -8.75484 18471 5306032004 MANDEU RAIMANUS NUSA TENGGARA TIMUR 182 Phase 3 40 28 120 6.1 124.92306 -9.36131 18472 5313140015 ROBEK NUSA TENGGARA TIMUR 71 Phase 3 18 15 282 3.3 120.40820 -8.29169 18473 5306032004 MANDEU RAIMANUS NUSA TENGGARA TIMUR 194 Phase 3 43 30 229 6.5 124.92241 -9.35543 18474 5312020015 NARU NUSA TENGGARA TIMUR 152 Phase 3 31 26 319 5.7 121.00579 -8.75668 18475 5305052004 KAUBELE NUSA TENGGARA TIMUR 46 Phase 3 12 8 436 1.8 124.61891 -9.21561 18476 5311052007 WOLOARO NUSA TENGGARA TIMUR 32 Phase 3 9 7 641 1.6 121.97203 -8.76093 18477 5303170010 FATUKONA NUSA TENGGARA TIMUR 113 Phase 3 23 16 169 3.5 123.97597 -9.90823 18478 5311052007 WOLOARO NUSA TENGGARA TIMUR 96 Phase 3 27 22 923 4.9 121.97731 -8.76186 18479 5305021004 POPNAM NUSA TENGGARA TIMUR 142 Phase 3 36 25 308 5.5 124.53395 -9.63784 18480 5311052007 WOLOARO NUSA TENGGARA TIMUR 50 Phase 3 15 12 735 2.7 121.97941 -8.75928 18481 5303120008 OELNASI NUSA TENGGARA TIMUR 144 Phase 3 32 22 496 4.9 123.71030 -10.16489 18482 5313040011 LEGU NUSA TENGGARA TIMUR 160 Phase 3 35 29 715 6.4 120.44632 -8.79472 18483 5304010005 LELOBATAN NUSA TENGGARA TIMUR 21 Phase 3 5 3 515 0.8 124.21145 -9.74857 18484 5319040009 NANGA MBALING NUSA TENGGARA TIMUR 687 Phase 3 164 139 236 30.0 120.71354 -8.44077 18485 5304010005 LELOBATAN NUSA TENGGARA TIMUR 117 Phase 3 27 18 981 4.1 124.21154 -9.76533 18486 5319030011 LEMPANG PAJI NUSA TENGGARA TIMUR 137 Phase 3 34 28 866 6.2 120.82724 -8.51906 18487 5304010005 LELOBATAN NUSA TENGGARA TIMUR 127 Phase 3 29 20 387 4.4 124.21014 -9.76726 18488 5319030011 LEMPANG PAJI NUSA TENGGARA TIMUR 81 Phase 3 20 16 980 3.7 120.82929 -8.52251 18489 5304023004 NEKE MANI FETO NUSA TENGGARA TIMUR 45 Phase 3 13 9 139 2.0 124.20268 -9.78140 18490 5319030011 LEMPANG PAJI NUSA TENGGARA TIMUR 347 Phase 3 86 73 014 15.8 120.83378 -8.53597 18491 5304023004 NEKE MANI FETO NUSA TENGGARA TIMUR 38 Phase 3 11 7 733 1.7 124.19485 -9.77916 18492 5311063004 KURU NUSA TENGGARA TIMUR 30 Phase 3 8 6 792 1.5 121.87467 -8.66907 18493 5304023004 NEKE MANI FETO NUSA TENGGARA TIMUR 68 Phase 3 19 13 357 2.9 124.19284 -9.77956 18494 5311063004 KURU NUSA TENGGARA TIMUR 11 Phase 3 3 2 547 0.5 121.87512 -8.66906 18495 5304023004 NEKE MANI FETO NUSA TENGGARA TIMUR 146 Phase 3 41 28 823 6.2 124.19058 -9.77870 18496 5311063004 KURU NUSA TENGGARA TIMUR 1 Phase 3 1 849 0.2 121.87497 -8.66322 18497 5304023004 NEKE MANI FETO NUSA TENGGARA TIMUR 108 Phase 3 30 21 090 4.6 124.18838 -9.77616 18498 5311063004 KURU NUSA TENGGARA TIMUR 39 Phase 3 11 9 339 2.0 121.87548 -8.66304 18499 5304023004 NEKE MANI FETO NUSA TENGGARA TIMUR 103 Phase 3 29 20 387 4.4 124.17510 -9.78263 Annex II – Demand forecast results Page 100 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 18500 5311063003 MUKUREKU NUSA TENGGARA TIMUR 59 Phase 3 29 24 621 5.3 121.86655 -8.63918 18501 5304023004 NEKE MANI FETO NUSA TENGGARA TIMUR 59 Phase 3 17 11 951 2.6 124.17163 -9.78253 18502 5311063003 MUKUREKU NUSA TENGGARA TIMUR 39 Phase 3 19 16 131 3.5 121.86550 -8.63800 18503 5304023004 NEKE MANI FETO NUSA TENGGARA TIMUR 59 Phase 3 17 11 951 2.6 124.17026 -9.78797 18504 5311063003 MUKUREKU NUSA TENGGARA TIMUR 40 Phase 3 20 16 980 3.7 121.87432 -8.63021 18505 5304020006 BISENE NUSA TENGGARA TIMUR 32 Phase 3 10 7 030 1.5 124.15909 -9.80285 18506 5311063010 NDIKOSAPU NUSA TENGGARA TIMUR 517 Phase 3 121 102 729 22.2 121.87402 -8.62953 18507 5304020006 BISENE NUSA TENGGARA TIMUR 60 Phase 3 18 12 654 2.7 124.15653 -9.80319 18508 5319030009 TENO MESE NUSA TENGGARA TIMUR 86 Phase 3 17 14 433 3.1 120.79370 -8.61150 18509 5304020006 BISENE NUSA TENGGARA TIMUR 89 Phase 3 27 18 981 4.1 124.15826 -9.80724 18510 5319060007 GOLO MUNGA NUSA TENGGARA TIMUR 72 Phase 3 19 16 131 3.5 120.56468 -8.42246 18511 5304020006 BISENE NUSA TENGGARA TIMUR 57 Phase 3 17 11 951 2.6 124.16452 -9.81006 18512 5319060007 GOLO MUNGA NUSA TENGGARA TIMUR 48 Phase 3 13 11 037 2.4 120.56328 -8.40981 18513 5304020006 BISENE NUSA TENGGARA TIMUR 63 Phase 3 19 13 357 2.9 124.16472 -9.81328 18514 5319060007 GOLO MUNGA NUSA TENGGARA TIMUR 78 Phase 3 20 16 980 3.7 120.57299 -8.40818 18515 5304020006 BISENE NUSA TENGGARA TIMUR 81 Phase 3 25 17 575 3.8 124.16608 -9.81671 18516 5319060007 GOLO MUNGA NUSA TENGGARA TIMUR 138 Phase 3 35 29 715 6.4 120.57698 -8.40604 18517 5304020006 BISENE NUSA TENGGARA TIMUR 34 Phase 3 11 7 733 1.7 124.16683 -9.81933 18518 5319060012 GOLO MANGUNG NUSA TENGGARA TIMUR 180 Phase 3 43 36 507 7.9 120.58965 -8.39801 18519 5304020006 BISENE NUSA TENGGARA TIMUR 36 Phase 3 11 7 733 1.7 124.17032 -9.81617 18520 5319060012 GOLO MANGUNG NUSA TENGGARA TIMUR 513 Phase 3 122 103 578 22.3 120.59428 -8.40560 18521 5304020007 BIKEKNENO NUSA TENGGARA TIMUR 70 Phase 3 12 8 436 1.8 124.18194 -9.83118 18522 5318010001 AEWOE NUSA TENGGARA TIMUR 136 Phase 3 29 24 621 5.3 121.13993 -8.87652 18523 5304020007 BIKEKNENO NUSA TENGGARA TIMUR 35 Phase 3 6 4 218 0.9 124.18382 -9.83201 18524 5310012011 BU UTARA NUSA TENGGARA TIMUR 105 Phase 3 26 22 074 4.8 121.94688 -8.73525 18525 5304020007 BIKEKNENO NUSA TENGGARA TIMUR 28 Phase 3 5 3 515 0.8 124.18293 -9.83339 18526 5311040008 NILA NUSA TENGGARA TIMUR 52 Phase 3 15 12 735 2.7 121.80319 -8.85726 18527 5304020005 BILOTO NUSA TENGGARA TIMUR 10 Phase 3 3 2 109 0.5 124.18725 -9.83983 18528 5312030009 TODABELU NUSA TENGGARA TIMUR 147 Phase 3 37 31 413 6.8 121.06676 -8.83426 18529 5304020005 BILOTO NUSA TENGGARA TIMUR 51 Phase 3 13 9 139 2.0 124.18614 -9.84334 18530 5312080015 SAMBINASI NUSA TENGGARA TIMUR 179 Phase 3 44 37 356 8.1 120.97205 -8.38283 18531 5304020005 BILOTO NUSA TENGGARA TIMUR 56 Phase 3 14 9 842 2.1 124.18646 -9.84525 18532 5312080015 SAMBINASI NUSA TENGGARA TIMUR 198 Phase 3 49 41 601 9.0 120.97033 -8.38506 18533 5304020005 BILOTO NUSA TENGGARA TIMUR 34 Phase 3 9 6 327 1.4 124.18880 -9.84966 18534 5312080015 SAMBINASI NUSA TENGGARA TIMUR 73 Phase 3 18 15 282 3.3 120.95602 -8.37186 18535 5304020005 BILOTO NUSA TENGGARA TIMUR 52 Phase 3 13 9 139 2.0 124.19042 -9.85222 18536 5312080015 SAMBINASI NUSA TENGGARA TIMUR 188 Phase 3 46 39 054 8.4 120.95485 -8.37228 18537 5304020005 BILOTO NUSA TENGGARA TIMUR 57 Phase 3 14 9 842 2.1 124.18750 -9.85357 18538 5312080015 SAMBINASI NUSA TENGGARA TIMUR 189 Phase 3 47 39 903 8.6 120.94956 -8.37573 18539 5304020005 BILOTO NUSA TENGGARA TIMUR 14 Phase 3 4 2 812 0.6 124.17221 -9.86028 18540 5313130006 BARANG NUSA TENGGARA TIMUR 48 Phase 3 13 11 037 2.4 120.53964 -8.49982 18541 5304020005 BILOTO NUSA TENGGARA TIMUR 11 Phase 3 3 2 109 0.5 124.17066 -9.85607 18542 5313130006 BARANG NUSA TENGGARA TIMUR 22 Phase 3 6 5 094 1.1 120.53925 -8.50017 18543 5304022002 FATUKOKO NUSA TENGGARA TIMUR 27 Phase 3 7 4 921 1.1 124.17048 -9.85538 18544 5318030002 PODENURA NUSA TENGGARA TIMUR 80 Phase 3 20 16 980 3.7 121.36841 -8.87575 18545 5304022002 FATUKOKO NUSA TENGGARA TIMUR 84 Phase 3 21 14 763 3.2 124.16961 -9.85571 18546 5315030011 TANGGE NUSA TENGGARA TIMUR 16 Phase 3 4 3 396 0.7 120.12474 -8.72691 18547 5304022002 FATUKOKO NUSA TENGGARA TIMUR 145 Phase 3 36 25 308 5.5 124.16907 -9.85318 18548 5311054004 WONDA NUSA TENGGARA TIMUR 81 Phase 3 22 18 678 4.0 121.93870 -8.79177 18549 5304022002 FATUKOKO NUSA TENGGARA TIMUR 84 Phase 3 21 14 763 3.2 124.16901 -9.85102 18550 5311012009 KOLIKAPA NUSA TENGGARA TIMUR 136 Phase 3 31 26 319 5.7 121.54497 -8.65223 18551 5304022002 FATUKOKO NUSA TENGGARA TIMUR 278 Phase 3 69 48 507 10.5 124.16986 -9.84961 18552 5311012009 KOLIKAPA NUSA TENGGARA TIMUR 307 Phase 3 68 57 732 12.5 121.52819 -8.65113 18553 5304022002 FATUKOKO NUSA TENGGARA TIMUR 357 Phase 3 88 61 864 13.3 124.16794 -9.84933 18554 5319010008 NGAMPANG MAS NUSA TENGGARA TIMUR 247 Phase 3 49 41 601 9.0 120.63952 -8.72983 18555 5304022002 FATUKOKO NUSA TENGGARA TIMUR 347 Phase 3 86 60 458 13.0 124.16853 -9.84603 18556 5310011007 PARABUBU NUSA TENGGARA TIMUR 57 Phase 3 16 13 584 2.9 122.02617 -8.63554 18557 5304022002 FATUKOKO NUSA TENGGARA TIMUR 37 Phase 3 10 7 030 1.5 124.15182 -9.84341 18558 5310011006 LIAKUTU NUSA TENGGARA TIMUR 173 Phase 3 43 36 507 7.9 122.03517 -8.63787 18559 5304022002 FATUKOKO NUSA TENGGARA TIMUR 414 Phase 3 102 71 706 15.5 124.14832 -9.84278 18560 5315031009 DUNTA NUSA TENGGARA TIMUR 22 Phase 3 6 5 094 1.1 120.22740 -8.57466 18561 5304012004 BONLEU NUSA TENGGARA TIMUR 74 Phase 3 19 13 357 2.9 124.28846 -9.59084 18562 5318010014 WOLOEDE NUSA TENGGARA TIMUR 56 Phase 3 13 11 037 2.4 121.21269 -8.83177 18563 5304012004 BONLEU NUSA TENGGARA TIMUR 78 Phase 3 20 14 060 3.0 124.28989 -9.59178 18564 5319040011 NANGA MBAUR NUSA TENGGARA TIMUR 528 Phase 3 79 67 071 14.5 120.78536 -8.34707 18565 5304021007 USAPIMNASI NUSA TENGGARA TIMUR 30 Phase 3 9 6 327 1.4 124.34527 -9.62790 18566 5310012012 BU WATUWETI NUSA TENGGARA TIMUR 194 Phase 3 56 47 544 10.3 121.95546 -8.71627 18567 5306011008 WEKEKE NUSA TENGGARA TIMUR 20 Phase 3 5 3 515 0.8 124.65403 -9.58974 18568 5310012012 BU WATUWETI NUSA TENGGARA TIMUR 110 Phase 3 32 27 168 5.9 121.94844 -8.71019 18569 5305022001 MAURISU NUSA TENGGARA TIMUR 130 Phase 3 37 26 011 5.6 124.65656 -9.57439 18570 5319010019 GOLO ROS NUSA TENGGARA TIMUR 223 Phase 3 53 44 997 9.7 120.53285 -8.72455 18571 5305022001 MAURISU NUSA TENGGARA TIMUR 20 Phase 3 6 4 218 0.9 124.66549 -9.57526 18572 5311061012 LISELANDE NUSA TENGGARA TIMUR 59 Phase 3 15 12 735 2.7 121.93583 -8.62398 18573 5305022001 MAURISU NUSA TENGGARA TIMUR 69 Phase 3 20 14 060 3.0 124.67639 -9.57493 18574 5311061012 LISELANDE NUSA TENGGARA TIMUR 73 Phase 3 18 15 282 3.3 121.93928 -8.61570 18575 5305022007 MAURISU SELATAN NUSA TENGGARA TIMUR 437 Phase 3 140 98 420 21.2 124.68973 -9.58073 18576 5311061005 HANGALANDE NUSA TENGGARA TIMUR 180 Phase 3 39 33 111 7.1 121.93942 -8.59419 18577 5305022007 MAURISU SELATAN NUSA TENGGARA TIMUR 103 Phase 3 33 23 199 5.0 124.68969 -9.56633 18578 5311061005 HANGALANDE NUSA TENGGARA TIMUR 342 Phase 3 74 62 826 13.6 121.95211 -8.59113 18579 5305040006 NANSEAN NUSA TENGGARA TIMUR 126 Phase 3 52 36 556 7.9 124.69037 -9.56145 18580 5311061005 HANGALANDE NUSA TENGGARA TIMUR 98 Phase 3 22 18 678 4.0 121.95551 -8.59114 18581 5304051002 TEAS NUSA TENGGARA TIMUR 42 Phase 3 11 7 733 1.7 124.28802 -9.93351 18582 5311061005 HANGALANDE NUSA TENGGARA TIMUR 180 Phase 3 39 33 111 7.1 121.95703 -8.59349 18583 5304051002 TEAS NUSA TENGGARA TIMUR 102 Phase 3 27 18 981 4.1 124.28806 -9.93674 18584 5319030006 SANGAN KALO NUSA TENGGARA TIMUR 175 Phase 3 40 33 960 7.3 120.84760 -8.56594 Annex II – Demand forecast results Page 101 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 18585 5304051002 TEAS NUSA TENGGARA TIMUR 81 Phase 3 21 14 763 3.2 124.29004 -9.94075 18586 5319030006 SANGAN KALO NUSA TENGGARA TIMUR 41 Phase 3 10 8 490 1.8 120.86164 -8.56721 18587 5304051002 TEAS NUSA TENGGARA TIMUR 140 Phase 3 37 26 011 5.6 124.29561 -9.94514 18588 5319030006 SANGAN KALO NUSA TENGGARA TIMUR 76 Phase 3 18 15 282 3.3 120.86351 -8.56729 18589 5304042001 LAKAT NUSA TENGGARA TIMUR 93 Phase 3 24 16 872 3.6 124.39867 -9.89032 18590 5312081004 BENTENG TAWA NUSA TENGGARA TIMUR 295 Phase 3 79 67 071 14.5 120.88456 -8.57503 18591 5304042001 LAKAT NUSA TENGGARA TIMUR 127 Phase 3 32 22 496 4.9 124.39805 -9.89160 18592 5312081004 BENTENG TAWA NUSA TENGGARA TIMUR 198 Phase 3 53 44 997 9.7 120.88318 -8.57850 18593 5306081004 LAKMARAS NUSA TENGGARA TIMUR 122 Phase 3 33 23 199 5.0 125.14714 -9.15206 18594 5312081004 BENTENG TAWA NUSA TENGGARA TIMUR 328 Phase 3 88 74 712 16.1 120.88932 -8.59714 18595 5304050012 LINAMNUTU NUSA TENGGARA TIMUR 175 Phase 3 42 29 526 6.4 124.22340 -10.02625 18596 5312081004 BENTENG TAWA NUSA TENGGARA TIMUR 104 Phase 3 28 23 772 5.1 120.89891 -8.59740 18597 5304050008 NOEMUKE NUSA TENGGARA TIMUR 68 Phase 3 17 11 951 2.6 124.34020 -10.06630 18598 5312081004 BENTENG TAWA NUSA TENGGARA TIMUR 152 Phase 3 41 34 809 7.5 120.89963 -8.59611 18599 5304023006 PIKA NUSA TENGGARA TIMUR 48 Phase 3 12 8 436 1.8 124.32647 -9.75966 18600 5319060013 SATAR PADUT NUSA TENGGARA TIMUR 60 Phase 3 15 12 735 2.7 120.59841 -8.29641 18601 5304023006 PIKA NUSA TENGGARA TIMUR 38 Phase 3 10 7 030 1.5 124.32560 -9.75787 18602 5319030021 GOLO LIJUN NUSA TENGGARA TIMUR 144 Phase 3 37 31 413 6.8 120.94733 -8.37743 18603 5303170010 FATUKONA NUSA TENGGARA TIMUR 200 Phase 3 41 28 823 6.2 123.97037 -9.89152 18604 5311050006 MBULIWARALAU NUSA TENGGARA TIMUR 22 Phase 3 7 5 943 1.3 121.89507 -8.80330 18605 5303170010 FATUKONA NUSA TENGGARA TIMUR 41 Phase 3 9 6 327 1.4 123.96785 -9.88913 18606 5311050005 MBULIWARALAU UTARA NUSA TENGGARA TIMUR 3 Phase 3 1 849 0.2 121.89479 -8.80316 18607 5303170010 FATUKONA NUSA TENGGARA TIMUR 583 Phase 3 117 82 251 17.7 123.95485 -9.88381 18608 5319030006 SANGAN KALO NUSA TENGGARA TIMUR 126 Phase 3 29 24 621 5.3 120.81383 -8.59533 18609 5303160014 KIUONI NUSA TENGGARA TIMUR 382 Phase 3 92 64 676 14.0 123.94925 -9.89938 18610 5310011006 LIAKUTU NUSA TENGGARA TIMUR 146 Phase 3 36 30 564 6.6 122.04757 -8.62808 18611 5305052007 OEPUAH SELATAN NUSA TENGGARA TIMUR 58 Phase 3 15 10 545 2.3 124.60668 -9.19850 18612 5310011005 GERA NUSA TENGGARA TIMUR 80 Phase 3 21 17 829 3.8 122.05666 -8.63143 18613 5305052007 OEPUAH SELATAN NUSA TENGGARA TIMUR 140 Phase 3 35 24 605 5.3 124.61115 -9.19489 18614 5310011005 GERA NUSA TENGGARA TIMUR 218 Phase 3 57 48 393 10.4 122.06253 -8.62891 18615 5305052005 OEPUAH NUSA TENGGARA TIMUR 62 Phase 3 15 10 545 2.3 124.60985 -9.19320 18616 5315010013 WATU NGGELEK NUSA TENGGARA TIMUR 14 Phase 3 4 3 396 0.7 119.90671 -8.57326 18617 5304040010 MNELALETE NUSA TENGGARA TIMUR 76 Phase 3 16 11 248 2.4 124.27410 -9.89945 18618 5310011005 GERA NUSA TENGGARA TIMUR 44 Phase 3 12 10 188 2.2 122.07355 -8.68105 18619 5304040010 MNELALETE NUSA TENGGARA TIMUR 81 Phase 3 17 11 951 2.6 124.27289 -9.89652 18620 5310011005 GERA NUSA TENGGARA TIMUR 62 Phase 3 17 14 433 3.1 122.07241 -8.68016 18621 5303131008 TOOBAUN NUSA TENGGARA TIMUR 409 Phase 3 98 68 894 14.9 123.78550 -10.29302 18622 5310011005 GERA NUSA TENGGARA TIMUR 119 Phase 3 32 27 168 5.9 122.07029 -8.67238 18623 5303131008 TOOBAUN NUSA TENGGARA TIMUR 84 Phase 3 21 14 763 3.2 123.78661 -10.29144 18624 5310011005 GERA NUSA TENGGARA TIMUR 177 Phase 3 47 39 903 8.6 122.07518 -8.68886 18625 5306023007 TUNMAT NUSA TENGGARA TIMUR 78 Phase 3 20 14 060 3.0 124.75096 -9.49797 18626 5311071013 TANALI NUSA TENGGARA TIMUR 151 Phase 3 43 36 507 7.9 121.71100 -8.65341 18627 5306023007 TUNMAT NUSA TENGGARA TIMUR 28 Phase 3 8 5 624 1.2 124.74965 -9.49825 18628 5313121015 RANGGI NUSA TENGGARA TIMUR 142 Phase 3 30 25 470 5.5 120.45148 -8.54954 18629 5304010005 LELOBATAN NUSA TENGGARA TIMUR 128 Phase 3 30 21 090 4.6 124.19393 -9.74583 18630 5312070007 ULUWAE NUSA TENGGARA TIMUR 59 Phase 3 14 11 886 2.6 120.91053 -8.65984 18631 5304010005 LELOBATAN NUSA TENGGARA TIMUR 5 Phase 3 2 1 406 0.3 124.19342 -9.74943 18632 5312070007 ULUWAE NUSA TENGGARA TIMUR 80 Phase 3 19 16 131 3.5 120.91252 -8.65984 18633 5304010005 LELOBATAN NUSA TENGGARA TIMUR 50 Phase 3 12 8 436 1.8 124.19378 -9.74966 18634 5312070007 ULUWAE NUSA TENGGARA TIMUR 64 Phase 3 15 12 735 2.7 120.91241 -8.66119 18635 5304010005 LELOBATAN NUSA TENGGARA TIMUR 14 Phase 3 4 2 812 0.6 124.19420 -9.74952 18636 5312070007 ULUWAE NUSA TENGGARA TIMUR 76 Phase 3 18 15 282 3.3 120.91413 -8.65982 18637 5304010005 LELOBATAN NUSA TENGGARA TIMUR 11 Phase 3 3 2 109 0.5 124.19371 -9.75009 18638 5311071017 AELIPO NUSA TENGGARA TIMUR 89 Phase 3 23 19 527 4.2 121.76961 -8.57246 18639 5305052004 KAUBELE NUSA TENGGARA TIMUR 46 Phase 3 12 8 436 1.8 124.62245 -9.21476 18640 5312011003 TIWORIWU NUSA TENGGARA TIMUR 144 Phase 3 31 26 319 5.7 120.98156 -8.86746 18641 5304040010 MNELALETE NUSA TENGGARA TIMUR 88 Phase 3 18 12 654 2.7 124.27844 -9.90041 18642 5319010014 GOLO MELENG NUSA TENGGARA TIMUR 109 Phase 3 21 17 829 3.8 120.59418 -8.70989 18643 5304072001 NEKE NUSA TENGGARA TIMUR 5 Phase 3 2 1 406 0.3 124.50008 -9.71129 18644 5319010014 GOLO MELENG NUSA TENGGARA TIMUR 113 Phase 3 22 18 678 4.0 120.59570 -8.70144 18645 5304072001 NEKE NUSA TENGGARA TIMUR 49 Phase 3 14 9 842 2.1 124.49952 -9.71180 18646 5319010014 GOLO MELENG NUSA TENGGARA TIMUR 243 Phase 3 47 39 903 8.6 120.59347 -8.69479 18647 5304072001 NEKE NUSA TENGGARA TIMUR 102 Phase 3 29 20 387 4.4 124.49868 -9.71607 18648 5319010014 GOLO MELENG NUSA TENGGARA TIMUR 197 Phase 3 38 32 262 7.0 120.60300 -8.70996 18649 5304021010 BALU NUSA TENGGARA TIMUR 33 Phase 3 9 6 327 1.4 124.42258 -9.70559 18650 5315011004 GOLO LUJANG NUSA TENGGARA TIMUR 379 Phase 3 86 73 014 15.8 120.11907 -8.52696 18651 5304021010 BALU NUSA TENGGARA TIMUR 15 Phase 3 4 2 812 0.6 124.41926 -9.70747 18652 5311050033 LISELOWOBORA NUSA TENGGARA TIMUR 81 Phase 3 18 15 282 3.3 121.90389 -8.76382 18653 5304021010 BALU NUSA TENGGARA TIMUR 37 Phase 3 9 6 327 1.4 124.42776 -9.72126 18654 5310010016 WOLOREGA NUSA TENGGARA TIMUR 58 Phase 3 21 17 829 3.8 122.02388 -8.69967 18655 5304021010 BALU NUSA TENGGARA TIMUR 141 Phase 3 35 24 605 5.3 124.43213 -9.71940 18656 5315020022 GOLO SEMBEA NUSA TENGGARA TIMUR 156 Phase 3 37 31 413 6.8 120.06192 -8.57392 18657 5304021002 KONBAKI NUSA TENGGARA TIMUR 271 Phase 3 63 44 289 9.6 124.43586 -9.71907 18658 5311060024 DETUWULU NUSA TENGGARA TIMUR 361 Phase 3 80 67 920 14.7 121.86132 -8.54577 18659 5304021010 BALU NUSA TENGGARA TIMUR 17 Phase 3 5 3 515 0.8 124.41623 -9.70815 18660 5313040009 TAL NUSA TENGGARA TIMUR 113 Phase 3 25 21 225 4.6 120.40262 -8.82011 18661 5304021010 BALU NUSA TENGGARA TIMUR 206 Phase 3 50 35 150 7.6 124.40913 -9.71077 18662 5319020004 KOMBA NUSA TENGGARA TIMUR 59 Phase 3 14 11 886 2.6 120.75652 -8.79494 18663 5304091005 NUALUNAT NUSA TENGGARA TIMUR 94 Phase 3 24 16 872 3.6 124.64412 -9.94141 18664 5319020004 KOMBA NUSA TENGGARA TIMUR 271 Phase 3 63 53 487 11.5 120.75887 -8.79892 18665 5304102001 OP NUSA TENGGARA TIMUR 293 Phase 3 73 51 319 11.1 124.65786 -9.93174 18666 5310012012 BU WATUWETI NUSA TENGGARA TIMUR 76 Phase 3 22 18 678 4.0 121.95712 -8.70029 18667 5304040011 PUSU NUSA TENGGARA TIMUR 72 Phase 3 19 13 357 2.9 124.33881 -9.91490 18668 5315030011 TANGGE NUSA TENGGARA TIMUR 22 Phase 3 5 4 245 0.9 120.06646 -8.72304 18669 5304040012 NULLE NUSA TENGGARA TIMUR 168 Phase 3 47 33 041 7.1 124.34617 -9.90447 Annex II – Demand forecast results Page 102 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 18670 5315030012 SIRU NUSA TENGGARA TIMUR 154 Phase 3 34 28 866 6.2 120.06834 -8.72227 18671 5303100007 UITAO NUSA TENGGARA TIMUR 86 Phase 3 23 16 169 3.5 123.41856 -10.18064 18672 5310011004 WOLODHESA NUSA TENGGARA TIMUR 91 Phase 3 23 19 527 4.2 122.03822 -8.67943 18673 5305025005 TES NUSA TENGGARA TIMUR 175 Phase 3 43 30 229 6.5 124.40356 -9.38829 18674 5318010016 SELALEJO NUSA TENGGARA TIMUR 89 Phase 3 19 16 131 3.5 121.25020 -8.83972 18675 5305040006 NANSEAN NUSA TENGGARA TIMUR 201 Phase 3 83 58 349 12.6 124.68048 -9.55011 18676 5318010016 SELALEJO NUSA TENGGARA TIMUR 93 Phase 3 20 16 980 3.7 121.24980 -8.84018 18677 5304111006 TUATAUM NUSA TENGGARA TIMUR 108 Phase 3 30 21 090 4.6 124.79076 -9.65529 18678 5319010002 SATAR LAHING NUSA TENGGARA TIMUR 79 Phase 3 15 12 735 2.7 120.56359 -8.75684 18679 5304111005 BOKONG NUSA TENGGARA TIMUR 106 Phase 3 17 11 951 2.6 124.79009 -9.65355 18680 5319010002 SATAR LAHING NUSA TENGGARA TIMUR 57 Phase 3 11 9 339 2.0 120.56044 -8.76028 18681 5305024006 INBATE NUSA TENGGARA TIMUR 26 Phase 3 7 4 921 1.1 124.37479 -9.42973 18682 5319010002 SATAR LAHING NUSA TENGGARA TIMUR 128 Phase 3 24 20 376 4.4 120.56427 -8.76272 18683 5305024006 INBATE NUSA TENGGARA TIMUR 134 Phase 3 34 23 902 5.2 124.37350 -9.42108 18684 5319010002 SATAR LAHING NUSA TENGGARA TIMUR 67 Phase 3 13 11 037 2.4 120.55425 -8.75814 18685 5305024006 INBATE NUSA TENGGARA TIMUR 37 Phase 3 10 7 030 1.5 124.37532 -9.42077 18686 5319010002 SATAR LAHING NUSA TENGGARA TIMUR 262 Phase 3 48 40 752 8.8 120.54622 -8.75885 18687 5304010008 EON BESI NUSA TENGGARA TIMUR 37 Phase 3 9 6 327 1.4 124.28796 -9.75313 18688 5319040011 NANGA MBAUR NUSA TENGGARA TIMUR 65 Phase 3 10 8 490 1.8 120.78690 -8.34527 18689 5304072001 NEKE NUSA TENGGARA TIMUR 137 Phase 3 39 27 417 5.9 124.49154 -9.72564 18690 5311061011 KOTABARU NUSA TENGGARA TIMUR 421 Phase 3 91 77 259 16.7 122.01138 -8.48907 18691 5305021003 NOEBAUN NUSA TENGGARA TIMUR 313 Phase 3 72 50 616 10.9 124.47528 -9.60192 18692 5311050036 LIKANAKA NUSA TENGGARA TIMUR 121 Phase 3 31 26 319 5.7 121.90106 -8.72853 18693 5304110005 TAUANAS NUSA TENGGARA TIMUR 42 Phase 3 17 11 951 2.6 124.74205 -9.72448 18694 5311071008 MAUTENDA NUSA TENGGARA TIMUR 210 Phase 3 45 38 205 8.2 121.71534 -8.65890 18695 5304110005 TAUANAS NUSA TENGGARA TIMUR 31 Phase 3 13 9 139 2.0 124.74285 -9.72248 18696 5312070019 WATUKAPU NUSA TENGGARA TIMUR 153 Phase 3 31 26 319 5.7 120.93735 -8.67487 18697 5304050011 KIUBAAT NUSA TENGGARA TIMUR 163 Phase 3 40 28 120 6.1 124.27453 -10.03000 18698 5312070019 WATUKAPU NUSA TENGGARA TIMUR 192 Phase 3 39 33 111 7.1 120.94952 -8.67703 18699 5305041007 FATUMTASA NUSA TENGGARA TIMUR 37 Phase 3 10 7 030 1.5 124.54764 -9.28638 18700 5312070019 WATUKAPU NUSA TENGGARA TIMUR 212 Phase 3 43 36 507 7.9 120.95068 -8.68071 18701 5305041006 HUMUSU A NUSA TENGGARA TIMUR 117 Phase 3 28 19 684 4.2 124.55093 -9.28804 18702 5312070019 WATUKAPU NUSA TENGGARA TIMUR 125 Phase 3 26 22 074 4.8 120.95170 -8.68287 18703 5305041006 HUMUSU A NUSA TENGGARA TIMUR 55 Phase 3 13 9 139 2.0 124.55486 -9.29394 18704 5312080008 WANGKA NUSA TENGGARA TIMUR 39 Phase 3 9 7 641 1.6 121.05996 -8.50719 18705 5305041006 HUMUSU A NUSA TENGGARA TIMUR 134 Phase 3 32 22 496 4.9 124.55806 -9.29757 18706 5312080008 WANGKA NUSA TENGGARA TIMUR 70 Phase 3 16 13 584 2.9 121.05764 -8.50777 18707 5305041006 HUMUSU A NUSA TENGGARA TIMUR 116 Phase 3 27 18 981 4.1 124.55415 -9.29883 18708 5312080008 WANGKA NUSA TENGGARA TIMUR 105 Phase 3 24 20 376 4.4 121.05756 -8.51091 18709 5305041006 HUMUSU A NUSA TENGGARA TIMUR 47 Phase 3 11 7 733 1.7 124.56072 -9.29544 18710 5319010012 GOLO LALONG NUSA TENGGARA TIMUR 46 Phase 3 10 8 490 1.8 120.62911 -8.66207 18711 5305041006 HUMUSU A NUSA TENGGARA TIMUR 87 Phase 3 21 14 763 3.2 124.55976 -9.29217 18712 5319010012 GOLO LALONG NUSA TENGGARA TIMUR 46 Phase 3 10 8 490 1.8 120.62596 -8.65052 18713 5305041006 HUMUSU A NUSA TENGGARA TIMUR 75 Phase 3 18 12 654 2.7 124.56106 -9.30335 18714 5319010012 GOLO LALONG NUSA TENGGARA TIMUR 111 Phase 3 24 20 376 4.4 120.62879 -8.64497 18715 5305041006 HUMUSU A NUSA TENGGARA TIMUR 143 Phase 3 34 23 902 5.2 124.56586 -9.30715 18716 5319010012 GOLO LALONG NUSA TENGGARA TIMUR 135 Phase 3 29 24 621 5.3 120.63714 -8.64718 18717 5305044005 BANUAN NUSA TENGGARA TIMUR 271 Phase 3 62 43 586 9.4 124.57710 -9.31958 18718 5319010012 GOLO LALONG NUSA TENGGARA TIMUR 20 Phase 3 5 4 245 0.9 120.63903 -8.64441 18719 5304050013 MIO NUSA TENGGARA TIMUR 229 Phase 3 61 42 883 9.3 124.21825 -9.97208 18720 5319010012 GOLO LALONG NUSA TENGGARA TIMUR 48 Phase 3 11 9 339 2.0 120.64045 -8.64187 18721 5304060007 BASMUTI NUSA TENGGARA TIMUR 87 Phase 3 21 14 763 3.2 124.41542 -10.00861 18722 5319010012 GOLO LALONG NUSA TENGGARA TIMUR 147 Phase 3 32 27 168 5.9 120.64343 -8.63950 18723 5306023007 TUNMAT NUSA TENGGARA TIMUR 99 Phase 3 26 18 278 3.9 124.74849 -9.50222 18724 5319010012 GOLO LALONG NUSA TENGGARA TIMUR 152 Phase 3 33 28 017 6.0 120.60510 -8.64824 18725 5305061004 TUAMESE NUSA TENGGARA TIMUR 45 Phase 3 12 8 436 1.8 124.75814 -9.06754 18726 5319010015 GOLO RUTUK NUSA TENGGARA TIMUR 45 Phase 3 9 7 641 1.6 120.59374 -8.65337 18727 5305061003 NONATBATAN NUSA TENGGARA TIMUR 195 Phase 3 52 36 556 7.9 124.75935 -9.06531 18728 5319010015 GOLO RUTUK NUSA TENGGARA TIMUR 214 Phase 3 41 34 809 7.5 120.59406 -8.65636 18729 5304050011 KIUBAAT NUSA TENGGARA TIMUR 143 Phase 3 36 25 308 5.5 124.27838 -10.02920 18730 5319010015 GOLO RUTUK NUSA TENGGARA TIMUR 179 Phase 3 35 29 715 6.4 120.58999 -8.65381 18731 5304061001 TOINEKE NUSA TENGGARA TIMUR 153 Phase 3 37 26 011 5.6 124.37064 -10.15187 18732 5319010015 GOLO RUTUK NUSA TENGGARA TIMUR 134 Phase 3 26 22 074 4.8 120.58532 -8.64139 18733 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 38 Phase 3 11 7 733 1.7 124.31392 -9.81646 18734 5319010015 GOLO RUTUK NUSA TENGGARA TIMUR 106 Phase 3 21 17 829 3.8 120.58625 -8.63855 18735 5306032004 MANDEU RAIMANUS NUSA TENGGARA TIMUR 42 Phase 3 10 7 030 1.5 124.91956 -9.36741 18736 5319010015 GOLO RUTUK NUSA TENGGARA TIMUR 63 Phase 3 13 11 037 2.4 120.58725 -8.63842 18737 5306032004 MANDEU RAIMANUS NUSA TENGGARA TIMUR 229 Phase 3 50 35 150 7.6 124.90568 -9.36395 18738 5319010015 GOLO RUTUK NUSA TENGGARA TIMUR 45 Phase 3 9 7 641 1.6 120.58356 -8.64060 18739 5306030015 RAIULUN NUSA TENGGARA TIMUR 78 Phase 3 18 12 654 2.7 124.90242 -9.37662 18740 5315050005 KOMBO NUSA TENGGARA TIMUR 251 Phase 3 69 58 581 12.6 120.24215 -8.46662 18741 5306030015 RAIULUN NUSA TENGGARA TIMUR 12 Phase 3 3 2 109 0.5 124.90036 -9.38078 18742 5315030011 TANGGE NUSA TENGGARA TIMUR 22 Phase 3 5 4 245 0.9 120.12463 -8.73919 18743 5306030015 RAIULUN NUSA TENGGARA TIMUR 29 Phase 3 7 4 921 1.1 124.90062 -9.38120 18744 5315030011 TANGGE NUSA TENGGARA TIMUR 234 Phase 3 54 45 846 9.9 120.10856 -8.74736 18745 5306030015 RAIULUN NUSA TENGGARA TIMUR 78 Phase 3 18 12 654 2.7 124.91315 -9.38896 18746 5315010025 LABUAN BAJO NUSA TENGGARA TIMUR 263 Phase 3 73 61 977 13.4 119.87211 -8.45823 18747 5306030015 RAIULUN NUSA TENGGARA TIMUR 91 Phase 3 20 14 060 3.0 124.91970 -9.39728 18748 5319010002 SATAR LAHING NUSA TENGGARA TIMUR 51 Phase 3 10 8 490 1.8 120.54364 -8.74712 18749 5306030014 WEMEDA NUSA TENGGARA TIMUR 116 Phase 3 27 18 981 4.1 124.91944 -9.39869 18750 5313041007 TERONG NUSA TENGGARA TIMUR 70 Phase 3 18 15 282 3.3 120.34851 -8.77396 18751 5306030015 RAIULUN NUSA TENGGARA TIMUR 33 Phase 3 8 5 624 1.2 124.92440 -9.39666 18752 5315030013 WAE WAKO NUSA TENGGARA TIMUR 74 Phase 3 19 16 131 3.5 120.09723 -8.69483 18753 5306030015 RAIULUN NUSA TENGGARA TIMUR 84 Phase 3 19 13 357 2.9 124.92601 -9.39564 18754 5315030013 WAE WAKO NUSA TENGGARA TIMUR 178 Phase 3 45 38 205 8.2 120.08912 -8.69335 Annex II – Demand forecast results Page 103 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 18755 5306030015 RAIULUN NUSA TENGGARA TIMUR 59 Phase 3 13 9 139 2.0 124.92693 -9.39620 18756 5311012005 MAGEKAPA NUSA TENGGARA TIMUR 90 Phase 3 21 17 829 3.8 121.54427 -8.61695 18757 5306030015 RAIULUN NUSA TENGGARA TIMUR 61 Phase 3 14 9 842 2.1 124.92716 -9.39576 18758 5311012005 MAGEKAPA NUSA TENGGARA TIMUR 274 Phase 3 62 52 638 11.4 121.54595 -8.59533 18759 5306030015 RAIULUN NUSA TENGGARA TIMUR 242 Phase 3 53 37 259 8.0 124.93696 -9.40286 18760 5311012005 MAGEKAPA NUSA TENGGARA TIMUR 160 Phase 3 36 30 564 6.6 121.54233 -8.59225 18761 5306040009 BABULU NUSA TENGGARA TIMUR 13 Phase 3 4 2 812 0.6 124.94944 -9.39426 18762 5319050017 COMPANG LAHO NUSA TENGGARA TIMUR 56 Phase 3 14 11 886 2.6 120.55787 -8.54496 18763 5306040009 BABULU NUSA TENGGARA TIMUR 26 Phase 3 7 4 921 1.1 124.94927 -9.39387 18764 5319060012 GOLO MANGUNG NUSA TENGGARA TIMUR 50 Phase 3 12 10 188 2.2 120.59131 -8.39535 18765 5306032003 RENRUA NUSA TENGGARA TIMUR 283 Phase 3 80 56 240 12.1 124.95014 -9.38560 18766 5319060003 COMPANG MEKAR NUSA TENGGARA TIMUR 84 Phase 3 22 18 678 4.0 120.59661 -8.46632 18767 5305052006 OEPUAH UTARA NUSA TENGGARA TIMUR 356 Phase 3 79 55 537 12.0 124.58803 -9.16221 18768 5312080015 SAMBINASI NUSA TENGGARA TIMUR 125 Phase 3 31 26 319 5.7 120.94700 -8.37791 18769 5306013013 HAITIMUK NUSA TENGGARA TIMUR 148 Phase 3 31 21 793 4.7 124.85416 -9.59579 18770 5319030011 LEMPANG PAJI NUSA TENGGARA TIMUR 133 Phase 3 33 28 017 6.0 120.83150 -8.50817 18771 5303180010 OELBANU NUSA TENGGARA TIMUR 670 Phase 3 149 104 747 22.6 123.89664 -9.70483 18772 5319030011 LEMPANG PAJI NUSA TENGGARA TIMUR 275 Phase 3 68 57 732 12.5 120.82708 -8.50234 18773 5304061003 KIUFATU NUSA TENGGARA TIMUR 90 Phase 3 23 16 169 3.5 124.40636 -10.11853 18774 5318020009 KELI NUSA TENGGARA TIMUR 52 Phase 3 13 11 037 2.4 121.24775 -8.88492 18775 5304061002 TUAFANU NUSA TENGGARA TIMUR 113 Phase 3 34 23 902 5.2 124.41195 -10.12413 18776 5315050009 MBAKUNG NUSA TENGGARA TIMUR 317 Phase 3 81 68 769 14.8 120.25243 -8.37228 18777 5304061002 TUAFANU NUSA TENGGARA TIMUR 16 Phase 3 5 3 515 0.8 124.41214 -10.12515 18778 5319060012 GOLO MANGUNG NUSA TENGGARA TIMUR 177 Phase 3 42 35 658 7.7 120.60625 -8.37967 18779 5303133003 RABEKA NUSA TENGGARA TIMUR 53 Phase 3 13 9 139 2.0 124.03313 -10.16264 18780 5319060012 GOLO MANGUNG NUSA TENGGARA TIMUR 348 Phase 3 83 70 467 15.2 120.61581 -8.39287 18781 5304020007 BIKEKNENO NUSA TENGGARA TIMUR 27 Phase 3 5 3 515 0.8 124.18937 -9.83074 18782 5313140010 MATA AIR NUSA TENGGARA TIMUR 55 Phase 3 14 11 886 2.6 120.47229 -8.30073 18783 5304020007 BIKEKNENO NUSA TENGGARA TIMUR 38 Phase 3 7 4 921 1.1 124.19139 -9.82724 18784 5311012001 KEBIRANGGA SELATAN NUSA TENGGARA TIMUR 117 Phase 3 25 21 225 4.6 121.59373 -8.67027 18785 5304020007 BIKEKNENO NUSA TENGGARA TIMUR 23 Phase 3 4 2 812 0.6 124.19862 -9.82612 18786 5311012001 KEBIRANGGA SELATAN NUSA TENGGARA TIMUR 145 Phase 3 31 26 319 5.7 121.58445 -8.67396 18787 5304020007 BIKEKNENO NUSA TENGGARA TIMUR 86 Phase 3 15 10 545 2.3 124.20047 -9.82402 18788 5311071002 MAUTENDA BARAT NUSA TENGGARA TIMUR 72 Phase 3 16 13 584 2.9 121.68520 -8.64646 18789 5304020007 BIKEKNENO NUSA TENGGARA TIMUR 19 Phase 3 4 2 812 0.6 124.20392 -9.82282 18790 5311070038 WOLOGAI TENGAH NUSA TENGGARA TIMUR 116 Phase 3 29 24 621 5.3 121.79950 -8.68622 18791 5304020007 BIKEKNENO NUSA TENGGARA TIMUR 369 Phase 3 63 44 289 9.6 124.20924 -9.81875 18792 5311070019 NUAONE NUSA TENGGARA TIMUR 58 Phase 3 17 14 433 3.1 121.79302 -8.68754 18793 5304030012 KUATAE NUSA TENGGARA TIMUR 121 Phase 3 38 26 714 5.8 124.27468 -9.87886 18794 5311070019 NUAONE NUSA TENGGARA TIMUR 87 Phase 3 25 21 225 4.6 121.79084 -8.68684 18795 5304042005 NAUKAE NUSA TENGGARA TIMUR 164 Phase 3 44 30 932 6.7 124.38882 -9.78899 18796 5315011008 BATU TIGA NUSA TENGGARA TIMUR 198 Phase 3 51 43 299 9.3 120.04599 -8.38852 18797 5304051006 OEBAKI NUSA TENGGARA TIMUR 126 Phase 3 31 21 793 4.7 124.35096 -9.94636 18798 5315011008 BATU TIGA NUSA TENGGARA TIMUR 502 Phase 3 129 109 521 23.6 120.06248 -8.38108 18799 5305020032 OESENA NUSA TENGGARA TIMUR 9 Phase 3 3 2 109 0.5 124.45004 -9.40439 18800 5319010001 BEA NGENCUNG NUSA TENGGARA TIMUR 93 Phase 3 22 18 678 4.0 120.53778 -8.76525 18801 5304050012 LINAMNUTU NUSA TENGGARA TIMUR 147 Phase 3 35 24 605 5.3 124.17019 -10.04161 18802 5319010001 BEA NGENCUNG NUSA TENGGARA TIMUR 218 Phase 3 51 43 299 9.3 120.53183 -8.76083 18803 5304040010 MNELALETE NUSA TENGGARA TIMUR 134 Phase 3 27 18 981 4.1 124.28050 -9.89938 18804 5311062004 DETUKELI NUSA TENGGARA TIMUR 16 Phase 3 4 3 396 0.7 121.83117 -8.62529 18805 5304080007 PISAN NUSA TENGGARA TIMUR 82 Phase 3 23 16 169 3.5 124.59227 -9.73233 18806 5311062004 DETUKELI NUSA TENGGARA TIMUR 21 Phase 3 5 4 245 0.9 121.83163 -8.62466 18807 5304023006 PIKA NUSA TENGGARA TIMUR 60 Phase 3 15 10 545 2.3 124.32821 -9.76560 18808 5311062004 DETUKELI NUSA TENGGARA TIMUR 29 Phase 3 7 5 943 1.3 121.83262 -8.62394 18809 5304023006 PIKA NUSA TENGGARA TIMUR 96 Phase 3 23 16 169 3.5 124.32839 -9.77127 18810 5311062006 KANGANARA NUSA TENGGARA TIMUR 203 Phase 3 48 40 752 8.8 121.84095 -8.62377 18811 5304022004 SALBAIT NUSA TENGGARA TIMUR 26 Phase 3 8 5 624 1.2 124.09693 -9.87754 18812 5315010025 LABUAN BAJO NUSA TENGGARA TIMUR 213 Phase 3 59 50 091 10.8 119.87374 -8.41812 18813 5304022004 SALBAIT NUSA TENGGARA TIMUR 76 Phase 3 22 15 466 3.3 124.09927 -9.87066 18814 5315010009 PASIR PUTIH NUSA TENGGARA TIMUR 211 Phase 3 48 40 752 8.8 119.85630 -8.39657 18815 5304022003 KOA NUSA TENGGARA TIMUR 334 Phase 3 95 66 785 14.4 124.11860 -9.87973 18816 5315010009 PASIR PUTIH NUSA TENGGARA TIMUR 438 Phase 3 99 84 051 18.1 119.85381 -8.39513 18817 5304023002 OELBUBUK NUSA TENGGARA TIMUR 94 Phase 3 23 16 169 3.5 124.28826 -9.76153 18818 5318030008 DEGALEA NUSA TENGGARA TIMUR 149 Phase 3 35 29 715 6.4 121.31960 -8.81371 18819 5304023002 OELBUBUK NUSA TENGGARA TIMUR 44 Phase 3 11 7 733 1.7 124.28628 -9.76349 18820 5313041018 NAO NUSA TENGGARA TIMUR 50 Phase 3 14 11 886 2.6 120.35509 -8.67959 18821 5303100006 OTAN NUSA TENGGARA TIMUR 92 Phase 3 22 15 466 3.3 123.38686 -10.17785 18822 5319060012 GOLO MANGUNG NUSA TENGGARA TIMUR 154 Phase 3 37 31 413 6.8 120.62420 -8.35965 18823 5303100011 BATUINAN NUSA TENGGARA TIMUR 70 Phase 3 21 14 763 3.2 123.39395 -10.14550 18824 5319060012 GOLO MANGUNG NUSA TENGGARA TIMUR 374 Phase 3 89 75 561 16.3 120.60166 -8.34976 18825 5303100011 BATUINAN NUSA TENGGARA TIMUR 77 Phase 3 23 16 169 3.5 123.39538 -10.14109 18826 5319060011 LENCUR NUSA TENGGARA TIMUR 236 Phase 3 48 40 752 8.8 120.65261 -8.35574 18827 5304012004 BONLEU NUSA TENGGARA TIMUR 64 Phase 3 17 11 951 2.6 124.30769 -9.60582 18828 5319060011 LENCUR NUSA TENGGARA TIMUR 272 Phase 3 55 46 695 10.1 120.65576 -8.35484 18829 5304050012 LINAMNUTU NUSA TENGGARA TIMUR 200 Phase 3 48 33 744 7.3 124.15634 -10.03334 18830 5319040008 NANGA BARAS NUSA TENGGARA TIMUR 101 Phase 3 22 18 678 4.0 120.65966 -8.35555 18831 5304050012 LINAMNUTU NUSA TENGGARA TIMUR 139 Phase 3 33 23 199 5.0 124.15310 -10.02307 18832 5311063004 KURU NUSA TENGGARA TIMUR 65 Phase 3 17 14 433 3.1 121.87206 -8.69745 18833 5306040008 BABULU SELATAN NUSA TENGGARA TIMUR 138 Phase 3 38 26 714 5.8 124.97811 -9.45059 18834 5312010012 SEBOWULI NUSA TENGGARA TIMUR 170 Phase 3 42 35 658 7.7 120.91256 -8.89389 18835 5304112001 LOTAS NUSA TENGGARA TIMUR 99 Phase 3 31 21 793 4.7 124.75957 -9.60973 18836 5312010011 INERIE NUSA TENGGARA TIMUR 58 Phase 3 17 14 433 3.1 120.92156 -8.89214 18837 5306010009 RABASA NUSA TENGGARA TIMUR 135 Phase 3 41 28 823 6.2 124.88608 -9.67813 18838 5312010011 INERIE NUSA TENGGARA TIMUR 47 Phase 3 14 11 886 2.6 120.92363 -8.89451 18839 5306031007 TESA NUSA TENGGARA TIMUR 108 Phase 3 29 20 387 4.4 124.81861 -9.38258 Annex II – Demand forecast results Page 104 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 18840 5312010011 INERIE NUSA TENGGARA TIMUR 37 Phase 3 11 9 339 2.0 120.92273 -8.89648 18841 5303141003 OEMOLO NUSA TENGGARA TIMUR 178 Phase 3 47 33 041 7.1 124.18235 -10.07600 18842 5312030013 RADABATA NUSA TENGGARA TIMUR 226 Phase 3 50 42 450 9.2 121.03418 -8.86527 18843 5306081006 EKIN NUSA TENGGARA TIMUR 4 Phase 3 2 1 406 0.3 125.12496 -9.12316 18844 5315030006 SURUNUMBENG NUSA TENGGARA TIMUR 103 Phase 3 23 19 527 4.2 120.23783 -8.77134 18845 5304060007 BASMUTI NUSA TENGGARA TIMUR 133 Phase 3 31 21 793 4.7 124.38701 -10.01861 18846 5311063004 KURU NUSA TENGGARA TIMUR 47 Phase 3 13 11 037 2.4 121.88056 -8.66640 18847 5304090012 OINLASI NUSA TENGGARA TIMUR 68 Phase 3 11 7 733 1.7 124.57096 -9.86519 18848 5311063006 TANALANGI NUSA TENGGARA TIMUR 94 Phase 3 22 18 678 4.0 121.88685 -8.66788 18849 5304090012 OINLASI NUSA TENGGARA TIMUR 234 Phase 3 37 26 011 5.6 124.57659 -9.86775 18850 5315030012 SIRU NUSA TENGGARA TIMUR 118 Phase 3 26 22 074 4.8 120.09964 -8.70192 18851 5303121003 BOKONG NUSA TENGGARA TIMUR 32 Phase 3 9 6 327 1.4 123.72504 -10.23279 18852 5315011004 GOLO LUJANG NUSA TENGGARA TIMUR 79 Phase 3 18 15 282 3.3 120.11815 -8.54388 18853 5303121003 BOKONG NUSA TENGGARA TIMUR 157 Phase 3 43 30 229 6.5 123.72545 -10.23483 18854 5315011004 GOLO LUJANG NUSA TENGGARA TIMUR 151 Phase 3 35 29 715 6.4 120.11807 -8.54560 18855 5304070022 SOPO NUSA TENGGARA TIMUR 53 Phase 3 14 9 842 2.1 124.46019 -9.77937 18856 5315011004 GOLO LUJANG NUSA TENGGARA TIMUR 123 Phase 3 28 23 772 5.1 120.12990 -8.55707 18857 5304072005 NIKI NIKI UN NUSA TENGGARA TIMUR 39 Phase 3 9 6 327 1.4 124.46052 -9.77869 18858 5315031011 PENGKA NUSA TENGGARA TIMUR 411 Phase 3 99 84 051 18.1 120.13803 -8.56692 18859 5304072005 NIKI NIKI UN NUSA TENGGARA TIMUR 65 Phase 3 15 10 545 2.3 124.46152 -9.77606 18860 5315050001 LOHA NUSA TENGGARA TIMUR 209 Phase 3 49 41 601 9.0 120.14717 -8.55847 18861 5303100012 LETBAUN NUSA TENGGARA TIMUR 81 Phase 3 22 15 466 3.3 123.42513 -10.16351 18862 5319010004 GOLO KANTAR NUSA TENGGARA TIMUR 157 Phase 3 34 28 866 6.2 120.59303 -8.75658 18863 5303100012 LETBAUN NUSA TENGGARA TIMUR 97 Phase 3 26 18 278 3.9 123.42789 -10.15840 18864 5315020002 WAE SANO NUSA TENGGARA TIMUR 34 Phase 3 8 6 792 1.5 120.00018 -8.68774 18865 5303100012 LETBAUN NUSA TENGGARA TIMUR 100 Phase 3 27 18 981 4.1 123.42407 -10.15510 18866 5318060013 DANGA NUSA TENGGARA TIMUR 115 Phase 3 24 20 376 4.4 121.29721 -8.54629 18867 5303100012 LETBAUN NUSA TENGGARA TIMUR 175 Phase 3 46 32 338 7.0 123.42517 -10.14302 18868 5318060013 DANGA NUSA TENGGARA TIMUR 158 Phase 3 33 28 017 6.0 121.28763 -8.54923 18869 5305021001 KIUOLA NUSA TENGGARA TIMUR 133 Phase 3 36 25 308 5.5 124.46131 -9.61512 18870 5319040005 BUTI NUSA TENGGARA TIMUR 138 Phase 3 33 28 017 6.0 120.70547 -8.50139 18871 5304021004 LOLI NUSA TENGGARA TIMUR 52 Phase 3 15 10 545 2.3 124.44623 -9.63584 18872 5315010003 PASIR PANJANG NUSA TENGGARA TIMUR 169 Phase 3 41 34 809 7.5 119.77385 -8.65815 18873 5304021004 LOLI NUSA TENGGARA TIMUR 91 Phase 3 27 18 981 4.1 124.44171 -9.63982 18874 5315010003 PASIR PANJANG NUSA TENGGARA TIMUR 152 Phase 3 37 31 413 6.8 119.76789 -8.65897 18875 5304021004 LOLI NUSA TENGGARA TIMUR 300 Phase 3 87 61 161 13.2 124.44708 -9.64258 18876 5315010004 GOLO MORI NUSA TENGGARA TIMUR 135 Phase 3 29 24 621 5.3 119.81158 -8.66140 18877 5305040006 NANSEAN NUSA TENGGARA TIMUR 203 Phase 3 84 59 052 12.7 124.67612 -9.54203 18878 5315010004 GOLO MORI NUSA TENGGARA TIMUR 241 Phase 3 51 43 299 9.3 119.81271 -8.66129 18879 5306020004 KATERI NUSA TENGGARA TIMUR 61 Phase 3 18 12 654 2.7 124.83713 -9.55996 18880 5315010004 GOLO MORI NUSA TENGGARA TIMUR 71 Phase 3 16 13 584 2.9 119.82349 -8.68213 18881 5306021015 BEANENO NUSA TENGGARA TIMUR 50 Phase 3 13 9 139 2.0 124.84673 -9.49935 18882 5315010004 GOLO MORI NUSA TENGGARA TIMUR 465 Phase 3 99 84 051 18.1 119.82393 -8.68985 18883 5306021015 BEANENO NUSA TENGGARA TIMUR 49 Phase 3 13 9 139 2.0 124.84529 -9.50049 18884 5315010004 GOLO MORI NUSA TENGGARA TIMUR 139 Phase 3 30 25 470 5.5 119.81454 -8.70011 18885 5304080018 TLIU NUSA TENGGARA TIMUR 105 Phase 3 32 22 496 4.9 124.55102 -9.71624 18886 5315010004 GOLO MORI NUSA TENGGARA TIMUR 190 Phase 3 41 34 809 7.5 119.81239 -8.70151 18887 5303192005 NETEMNANU NUSA TENGGARA TIMUR 764 Phase 3 214 150 442 32.5 124.09081 -9.42268 18888 5315010004 GOLO MORI NUSA TENGGARA TIMUR 90 Phase 3 20 16 980 3.7 119.83615 -8.70600 18889 5306032007 DUAKORAN NUSA TENGGARA TIMUR 20 Phase 3 5 3 515 0.8 124.90972 -9.31661 18890 5315010004 GOLO MORI NUSA TENGGARA TIMUR 295 Phase 3 63 53 487 11.5 119.83772 -8.70645 18891 5304010010 SEBOT NUSA TENGGARA TIMUR 60 Phase 3 16 11 248 2.4 124.28786 -9.68642 18892 5315020006 GOLO MANTING NUSA TENGGARA TIMUR 81 Phase 3 22 18 678 4.0 119.94929 -8.65088 18893 5304010010 SEBOT NUSA TENGGARA TIMUR 108 Phase 3 28 19 684 4.2 124.29303 -9.68832 18894 5315020006 GOLO MANTING NUSA TENGGARA TIMUR 336 Phase 3 88 74 712 16.1 119.93692 -8.64968 18895 5304012004 BONLEU NUSA TENGGARA TIMUR 118 Phase 3 30 21 090 4.6 124.27800 -9.59297 18896 5315020006 GOLO MANTING NUSA TENGGARA TIMUR 115 Phase 3 31 26 319 5.7 119.92826 -8.65778 18897 5305044005 BANUAN NUSA TENGGARA TIMUR 177 Phase 3 41 28 823 6.2 124.58715 -9.34731 18898 5315020006 GOLO MANTING NUSA TENGGARA TIMUR 134 Phase 3 35 29 715 6.4 119.93862 -8.66229 18899 5304021001 LAOB NUSA TENGGARA TIMUR 12 Phase 3 4 2 812 0.6 124.35676 -9.69131 18900 5315020006 GOLO MANTING NUSA TENGGARA TIMUR 189 Phase 3 50 42 450 9.2 119.94486 -8.66335 18901 5304021001 LAOB NUSA TENGGARA TIMUR 17 Phase 3 5 3 515 0.8 124.35851 -9.69151 18902 5311061006 TOU TIMUR NUSA TENGGARA TIMUR 200 Phase 3 49 41 601 9.0 121.96783 -8.58152 18903 5304021001 LAOB NUSA TENGGARA TIMUR 34 Phase 3 10 7 030 1.5 124.35832 -9.68876 18904 5319020014 MOKEL NUSA TENGGARA TIMUR 74 Phase 3 17 14 433 3.1 120.69742 -8.67583 18905 5304021001 LAOB NUSA TENGGARA TIMUR 62 Phase 3 17 11 951 2.6 124.36219 -9.68715 18906 5319040011 NANGA MBAUR NUSA TENGGARA TIMUR 130 Phase 3 20 16 980 3.7 120.79326 -8.34245 18907 5304021001 LAOB NUSA TENGGARA TIMUR 12 Phase 3 4 2 812 0.6 124.36544 -9.68750 18908 5319010008 NGAMPANG MAS NUSA TENGGARA TIMUR 24 Phase 3 5 4 245 0.9 120.63122 -8.70685 18909 5304021001 LAOB NUSA TENGGARA TIMUR 17 Phase 3 5 3 515 0.8 124.36668 -9.68725 18910 5319010008 NGAMPANG MAS NUSA TENGGARA TIMUR 209 Phase 3 41 34 809 7.5 120.63782 -8.70703 18911 5304021001 LAOB NUSA TENGGARA TIMUR 32 Phase 3 9 6 327 1.4 124.36816 -9.68573 18912 5319010008 NGAMPANG MAS NUSA TENGGARA TIMUR 106 Phase 3 21 17 829 3.8 120.63123 -8.71127 18913 5304021005 MNESATBUBAK NUSA TENGGARA TIMUR 32 Phase 3 8 5 624 1.2 124.37624 -9.68571 18914 5315050006 WONTONG NUSA TENGGARA TIMUR 133 Phase 3 27 22 923 4.9 120.28275 -8.44643 18915 5304021005 MNESATBUBAK NUSA TENGGARA TIMUR 72 Phase 3 18 12 654 2.7 124.37821 -9.68329 18916 5312030010 RATOGESA NUSA TENGGARA TIMUR 70 Phase 3 16 13 584 2.9 121.06564 -8.83998 18917 5304021001 LAOB NUSA TENGGARA TIMUR 73 Phase 3 20 14 060 3.0 124.38086 -9.69274 18918 5319030019 GOLO LEBO NUSA TENGGARA TIMUR 204 Phase 3 31 26 319 5.7 120.82384 -8.48591 18919 5304021001 LAOB NUSA TENGGARA TIMUR 17 Phase 3 5 3 515 0.8 124.38387 -9.69734 18920 5319030019 GOLO LEBO NUSA TENGGARA TIMUR 194 Phase 3 29 24 621 5.3 120.81552 -8.48463 18921 5304021010 BALU NUSA TENGGARA TIMUR 181 Phase 3 44 30 932 6.7 124.38655 -9.70122 18922 5319030019 GOLO LEBO NUSA TENGGARA TIMUR 124 Phase 3 19 16 131 3.5 120.82541 -8.47831 18923 5304021001 LAOB NUSA TENGGARA TIMUR 22 Phase 3 6 4 218 0.9 124.35246 -9.68892 18924 5319030019 GOLO LEBO NUSA TENGGARA TIMUR 153 Phase 3 23 19 527 4.2 120.82078 -8.46402 Annex II – Demand forecast results Page 105 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 18925 5304021001 LAOB NUSA TENGGARA TIMUR 50 Phase 3 14 9 842 2.1 124.34906 -9.68882 18926 5319030019 GOLO LEBO NUSA TENGGARA TIMUR 151 Phase 3 23 19 527 4.2 120.81911 -8.46418 18927 5304021001 LAOB NUSA TENGGARA TIMUR 25 Phase 3 7 4 921 1.1 124.34711 -9.69004 18928 5319030019 GOLO LEBO NUSA TENGGARA TIMUR 88 Phase 3 13 11 037 2.4 120.82530 -8.46125 18929 5304021001 LAOB NUSA TENGGARA TIMUR 31 Phase 3 9 6 327 1.4 124.34555 -9.69098 18930 5319030019 GOLO LEBO NUSA TENGGARA TIMUR 149 Phase 3 22 18 678 4.0 120.82365 -8.45704 18931 5304020005 BILOTO NUSA TENGGARA TIMUR 31 Phase 3 8 5 624 1.2 124.19288 -9.85372 18932 5319030020 LEGUR LAI NUSA TENGGARA TIMUR 678 Phase 3 147 124 803 26.9 120.87749 -8.44990 18933 5306060005 FATUBENAO NUSA TENGGARA TIMUR 126 Phase 3 28 19 684 4.2 124.91283 -9.10384 18934 5315030005 WATU WAJA NUSA TENGGARA TIMUR 147 Phase 3 36 30 564 6.6 120.23897 -8.77942 18935 5303130014 KOTABES NUSA TENGGARA TIMUR 137 Phase 3 37 26 011 5.6 123.85137 -10.24613 18936 5312070006 WAEWEA NUSA TENGGARA TIMUR 517 Phase 3 153 129 897 28.0 120.85438 -8.71077 18937 5304023006 PIKA NUSA TENGGARA TIMUR 77 Phase 3 19 13 357 2.9 124.33485 -9.77366 18938 5311041001 KURULIMBU NUSA TENGGARA TIMUR 154 Phase 3 36 30 564 6.6 121.74617 -8.82511 18939 5304110005 TAUANAS NUSA TENGGARA TIMUR 35 Phase 3 14 9 842 2.1 124.71794 -9.72384 18940 5315020004 GOLO SENGANG NUSA TENGGARA TIMUR 437 Phase 3 109 92 541 20.0 119.90588 -8.67338 18941 5305022008 TUBLOPO NUSA TENGGARA TIMUR 62 Phase 3 16 11 248 2.4 124.55718 -9.52723 18942 5315020004 GOLO SENGANG NUSA TENGGARA TIMUR 118 Phase 3 30 25 470 5.5 119.88449 -8.67323 18943 5305040008 AINIUT NUSA TENGGARA TIMUR 86 Phase 3 15 10 545 2.3 124.66982 -9.45828 18944 5315020004 GOLO SENGANG NUSA TENGGARA TIMUR 244 Phase 3 61 51 789 11.2 119.88255 -8.67293 18945 5305040008 AINIUT NUSA TENGGARA TIMUR 69 Phase 3 12 8 436 1.8 124.67119 -9.46141 18946 5319030021 GOLO LIJUN NUSA TENGGARA TIMUR 68 Phase 3 18 15 282 3.3 120.91425 -8.36103 18947 5305040008 AINIUT NUSA TENGGARA TIMUR 102 Phase 3 18 12 654 2.7 124.66728 -9.47209 18948 5319030021 GOLO LIJUN NUSA TENGGARA TIMUR 167 Phase 3 43 36 507 7.9 120.91487 -8.35946 18949 5305040008 AINIUT NUSA TENGGARA TIMUR 168 Phase 3 30 21 090 4.6 124.66659 -9.47533 18950 5319030021 GOLO LIJUN NUSA TENGGARA TIMUR 349 Phase 3 90 76 410 16.5 120.89235 -8.35597 18951 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 22 Phase 3 6 4 218 0.9 124.17584 -9.71894 18952 5319030021 GOLO LIJUN NUSA TENGGARA TIMUR 101 Phase 3 26 22 074 4.8 120.88343 -8.37418 18953 5304020007 BIKEKNENO NUSA TENGGARA TIMUR 44 Phase 3 8 5 624 1.2 124.21546 -9.81295 18954 5319030021 GOLO LIJUN NUSA TENGGARA TIMUR 129 Phase 3 33 28 017 6.0 120.88944 -8.39442 18955 5304020007 BIKEKNENO NUSA TENGGARA TIMUR 148 Phase 3 26 18 278 3.9 124.21574 -9.80899 18956 5319030021 GOLO LIJUN NUSA TENGGARA TIMUR 354 Phase 3 91 77 259 16.7 120.88071 -8.39712 18957 5304060006 KELLE NUSA TENGGARA TIMUR 231 Phase 3 52 36 556 7.9 124.43861 -10.04918 18958 5311041004 ROGA NUSA TENGGARA TIMUR 120 Phase 3 37 31 413 6.8 121.80061 -8.79690 18959 5304022004 SALBAIT NUSA TENGGARA TIMUR 48 Phase 3 14 9 842 2.1 124.12178 -9.80892 18960 5312082004 NGINAMANU NUSA TENGGARA TIMUR 230 Phase 3 45 38 205 8.2 121.00241 -8.66326 18961 5306032005 FATURIKA NUSA TENGGARA TIMUR 52 Phase 3 14 9 842 2.1 124.94138 -9.33699 18962 5312082004 NGINAMANU NUSA TENGGARA TIMUR 171 Phase 3 34 28 866 6.2 120.99665 -8.66048 18963 5304030004 KOBEKAMUSA NUSA TENGGARA TIMUR 137 Phase 3 28 19 684 4.2 124.31950 -9.86825 18964 5319010001 BEA NGENCUNG NUSA TENGGARA TIMUR 139 Phase 3 33 28 017 6.0 120.53830 -8.78024 18965 5306013014 WESEY NUSA TENGGARA TIMUR 142 Phase 3 32 22 496 4.9 124.82878 -9.61365 18966 5319010001 BEA NGENCUNG NUSA TENGGARA TIMUR 85 Phase 3 20 16 980 3.7 120.54163 -8.78372 18967 5304013003 NUNBENA NUSA TENGGARA TIMUR 14 Phase 3 4 2 812 0.6 124.14426 -9.66947 18968 5315010008 MACANG TANGGAR NUSA TENGGARA TIMUR 155 Phase 3 35 29 715 6.4 119.86199 -8.57500 18969 5304050011 KIUBAAT NUSA TENGGARA TIMUR 183 Phase 3 45 31 635 6.8 124.29160 -10.02352 18970 5315010008 MACANG TANGGAR NUSA TENGGARA TIMUR 88 Phase 3 20 16 980 3.7 119.83197 -8.55204 18971 5306012006 WEOE NUSA TENGGARA TIMUR 59 Phase 3 17 11 951 2.6 124.83855 -9.66633 18972 5315010008 MACANG TANGGAR NUSA TENGGARA TIMUR 98 Phase 3 23 19 527 4.2 119.83121 -8.55123 18973 5306012006 WEOE NUSA TENGGARA TIMUR 16 Phase 3 5 3 515 0.8 124.84167 -9.66351 18974 5315010008 MACANG TANGGAR NUSA TENGGARA TIMUR 159 Phase 3 36 30 564 6.6 119.82897 -8.55395 18975 5306012006 WEOE NUSA TENGGARA TIMUR 28 Phase 3 8 5 624 1.2 124.84222 -9.66350 18976 5315010009 PASIR PUTIH NUSA TENGGARA TIMUR 246 Phase 3 56 47 544 10.3 119.80026 -8.55059 18977 5306021020 NAISAU NUSA TENGGARA TIMUR 24 Phase 3 8 5 624 1.2 124.80443 -9.44345 18978 5315010009 PASIR PUTIH NUSA TENGGARA TIMUR 1 479 Phase 3 332 281 868 60.8 119.74586 -8.52780 18979 5306021020 NAISAU NUSA TENGGARA TIMUR 102 Phase 3 32 22 496 4.9 124.80171 -9.44509 18980 5311062005 KEBESANI NUSA TENGGARA TIMUR 38 Phase 3 9 7 641 1.6 121.80944 -8.63569 18981 5306021020 NAISAU NUSA TENGGARA TIMUR 114 Phase 3 35 24 605 5.3 124.80047 -9.44771 18982 5311062005 KEBESANI NUSA TENGGARA TIMUR 126 Phase 3 30 25 470 5.5 121.81491 -8.64360 18983 5305040010 OINBIT NUSA TENGGARA TIMUR 315 Phase 3 82 57 646 12.4 124.78189 -9.43092 18984 5311062001 WOLOMUKU NUSA TENGGARA TIMUR 141 Phase 3 31 26 319 5.7 121.80114 -8.62997 18985 5303121003 BOKONG NUSA TENGGARA TIMUR 82 Phase 3 23 16 169 3.5 123.75398 -10.20380 18986 5311062001 WOLOMUKU NUSA TENGGARA TIMUR 218 Phase 3 48 40 752 8.8 121.78496 -8.62905 18987 5303121003 BOKONG NUSA TENGGARA TIMUR 80 Phase 3 22 15 466 3.3 123.75074 -10.19888 18988 5311071009 FATAATU NUSA TENGGARA TIMUR 92 Phase 3 22 18 678 4.0 121.77705 -8.62684 18989 5303121003 BOKONG NUSA TENGGARA TIMUR 186 Phase 3 51 35 853 7.7 123.73274 -10.20770 18990 5319060001 TENGKULAWAR NUSA TENGGARA TIMUR 90 Phase 3 31 26 319 5.7 120.56081 -8.48391 18991 5303121003 BOKONG NUSA TENGGARA TIMUR 16 Phase 3 5 3 515 0.8 123.73124 -10.20677 18992 5311071001 MBOTULAKA NUSA TENGGARA TIMUR 302 Phase 3 73 61 977 13.4 121.65719 -8.64287 18993 5303121004 BAUMATA TIMUR NUSA TENGGARA TIMUR 94 Phase 3 22 15 466 3.3 123.73030 -10.20615 18994 5311071002 MAUTENDA BARAT NUSA TENGGARA TIMUR 14 Phase 3 3 2 547 0.5 121.65700 -8.64226 18995 5303133001 PAKUBAUN NUSA TENGGARA TIMUR 127 Phase 3 33 23 199 5.0 124.07035 -10.17923 18996 5312081006 RIA I NUSA TENGGARA TIMUR 79 Phase 3 21 17 829 3.8 120.96220 -8.47345 18997 5303121004 BAUMATA TIMUR NUSA TENGGARA TIMUR 93 Phase 3 21 14 763 3.2 123.70803 -10.19465 18998 5319060011 LENCUR NUSA TENGGARA TIMUR 256 Phase 3 52 44 148 9.5 120.62925 -8.40730 18999 5303180002 FATUMETAN NUSA TENGGARA TIMUR 97 Phase 3 19 13 357 2.9 123.95530 -9.73832 19000 5312010017 KELIGEJO NUSA TENGGARA TIMUR 297 Phase 3 68 57 732 12.5 120.86146 -8.80975 19001 5303180002 FATUMETAN NUSA TENGGARA TIMUR 257 Phase 3 49 34 447 7.4 123.95141 -9.74234 19002 5311053001 PEMO NUSA TENGGARA TIMUR 22 Phase 3 7 5 943 1.3 121.83361 -8.78292 19003 5303180002 FATUMETAN NUSA TENGGARA TIMUR 66 Phase 3 13 9 139 2.0 123.94818 -9.74160 19004 5315031011 PENGKA NUSA TENGGARA TIMUR 167 Phase 3 41 34 809 7.5 120.16060 -8.56656 19005 5303180002 FATUMETAN NUSA TENGGARA TIMUR 124 Phase 3 24 16 872 3.6 123.94546 -9.74501 19006 5311071008 MAUTENDA NUSA TENGGARA TIMUR 148 Phase 3 32 27 168 5.9 121.71839 -8.66444 19007 5303180002 FATUMETAN NUSA TENGGARA TIMUR 31 Phase 3 6 4 218 0.9 123.94021 -9.74739 19008 5318030011 NANGARORO NUSA TENGGARA TIMUR 20 Phase 3 5 4 245 0.9 121.39954 -8.77510 19009 5303180002 FATUMETAN NUSA TENGGARA TIMUR 29 Phase 3 6 4 218 0.9 123.93852 -9.74948 Annex II – Demand forecast results Page 106 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 19010 5318030012 NATAUTE NUSA TENGGARA TIMUR 81 Phase 3 21 17 829 3.8 121.39995 -8.77436 19011 5303180002 FATUMETAN NUSA TENGGARA TIMUR 130 Phase 3 25 17 575 3.8 123.93825 -9.75183 19012 5318030012 NATAUTE NUSA TENGGARA TIMUR 39 Phase 3 11 9 339 2.0 121.40339 -8.75059 19013 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 24 Phase 3 7 4 921 1.1 124.25359 -9.84096 19014 5318030012 NATAUTE NUSA TENGGARA TIMUR 8 Phase 3 3 2 547 0.5 121.40329 -8.74988 19015 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 56 Phase 3 16 11 248 2.4 124.25036 -9.83760 19016 5318030013 UTETOTO NUSA TENGGARA TIMUR 340 Phase 3 79 67 071 14.5 121.39053 -8.74296 19017 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 11 Phase 3 3 2 109 0.5 124.24975 -9.83644 19018 5318030012 NATAUTE NUSA TENGGARA TIMUR 89 Phase 3 24 20 376 4.4 121.41597 -8.75309 19019 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 36 Phase 3 10 7 030 1.5 124.25031 -9.83454 19020 5311010012 ONDOREA BARAT NUSA TENGGARA TIMUR 17 Phase 3 5 4 245 0.9 121.41830 -8.75013 19021 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 18 Phase 3 5 3 515 0.8 124.24984 -9.83431 19022 5311010012 ONDOREA BARAT NUSA TENGGARA TIMUR 90 Phase 3 22 18 678 4.0 121.41854 -8.74968 19023 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 18 Phase 3 5 3 515 0.8 124.25023 -9.82923 19024 5311010012 ONDOREA BARAT NUSA TENGGARA TIMUR 55 Phase 3 14 11 886 2.6 121.41759 -8.74881 19025 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 6 Phase 3 2 1 406 0.3 124.24992 -9.82881 19026 5319040010 POTA NUSA TENGGARA TIMUR 207 Phase 3 50 42 450 9.2 120.72673 -8.34801 19027 5304020007 BIKEKNENO NUSA TENGGARA TIMUR 25 Phase 3 5 3 515 0.8 124.24125 -9.82006 19028 5319040008 NANGA BARAS NUSA TENGGARA TIMUR 107 Phase 3 23 19 527 4.2 120.72007 -8.34001 19029 5304020007 BIKEKNENO NUSA TENGGARA TIMUR 182 Phase 3 31 21 793 4.7 124.24058 -9.81897 19030 5319040008 NANGA BARAS NUSA TENGGARA TIMUR 57 Phase 3 12 10 188 2.2 120.71911 -8.34046 19031 5304020007 BIKEKNENO NUSA TENGGARA TIMUR 183 Phase 3 32 22 496 4.9 124.23636 -9.81682 19032 5319040008 NANGA BARAS NUSA TENGGARA TIMUR 183 Phase 3 39 33 111 7.1 120.71502 -8.33406 19033 5306023007 TUNMAT NUSA TENGGARA TIMUR 203 Phase 3 52 36 556 7.9 124.72832 -9.50393 19034 5311020021 UZURAMBA NUSA TENGGARA TIMUR 184 Phase 3 39 33 111 7.1 121.57946 -8.73814 19035 5304040011 PUSU NUSA TENGGARA TIMUR 36 Phase 3 10 7 030 1.5 124.32510 -9.92148 19036 5319010002 SATAR LAHING NUSA TENGGARA TIMUR 133 Phase 3 25 21 225 4.6 120.56730 -8.77899 19037 5304010005 LELOBATAN NUSA TENGGARA TIMUR 48 Phase 3 11 7 733 1.7 124.21860 -9.74716 19038 5319050022 WATU ARUS NUSA TENGGARA TIMUR 47 Phase 3 11 9 339 2.0 120.60231 -8.52820 19039 5304010005 LELOBATAN NUSA TENGGARA TIMUR 79 Phase 3 19 13 357 2.9 124.22669 -9.75309 19040 5318030009 KOTAKEO NUSA TENGGARA TIMUR 46 Phase 3 11 9 339 2.0 121.27492 -8.82765 19041 5304010005 LELOBATAN NUSA TENGGARA TIMUR 99 Phase 3 23 16 169 3.5 124.23212 -9.75271 19042 5318030009 KOTAKEO NUSA TENGGARA TIMUR 106 Phase 3 26 22 074 4.8 121.26701 -8.82374 19043 5305022001 MAURISU NUSA TENGGARA TIMUR 51 Phase 3 15 10 545 2.3 124.65283 -9.56994 19044 5311061006 TOU TIMUR NUSA TENGGARA TIMUR 61 Phase 3 15 12 735 2.7 121.96899 -8.57726 19045 5306081006 EKIN NUSA TENGGARA TIMUR 45 Phase 3 12 8 436 1.8 125.13178 -9.11453 19046 5311061013 TOU BARAT NUSA TENGGARA TIMUR 194 Phase 3 59 50 091 10.8 121.95549 -8.56252 19047 5306032005 FATURIKA NUSA TENGGARA TIMUR 78 Phase 3 20 14 060 3.0 124.94624 -9.33077 19048 5312011003 TIWORIWU NUSA TENGGARA TIMUR 152 Phase 3 33 28 017 6.0 120.97075 -8.86055 19049 5306032005 FATURIKA NUSA TENGGARA TIMUR 79 Phase 3 20 14 060 3.0 124.94854 -9.32920 19050 5311054004 WONDA NUSA TENGGARA TIMUR 46 Phase 3 13 11 037 2.4 121.94398 -8.79838 19051 5305025001 FAENNAKE NUSA TENGGARA TIMUR 33 Phase 3 9 6 327 1.4 124.43683 -9.38088 19052 5311054003 MAUBASA TIMUR NUSA TENGGARA TIMUR 97 Phase 3 28 23 772 5.1 121.93853 -8.80484 19053 5305025001 FAENNAKE NUSA TENGGARA TIMUR 52 Phase 3 14 9 842 2.1 124.44004 -9.37997 19054 5311054004 WONDA NUSA TENGGARA TIMUR 69 Phase 3 19 16 131 3.5 121.94732 -8.80380 19055 5305025001 FAENNAKE NUSA TENGGARA TIMUR 48 Phase 3 13 9 139 2.0 124.44221 -9.38127 19056 5313140001 NGGALAK NUSA TENGGARA TIMUR 308 Phase 3 72 61 128 13.2 120.31745 -8.35396 19057 5304021007 USAPIMNASI NUSA TENGGARA TIMUR 34 Phase 3 10 7 030 1.5 124.32379 -9.63753 19058 5315030012 SIRU NUSA TENGGARA TIMUR 113 Phase 3 25 21 225 4.6 120.10421 -8.70983 19059 5306030015 RAIULUN NUSA TENGGARA TIMUR 115 Phase 3 26 18 278 3.9 124.92833 -9.40830 19060 5319010002 SATAR LAHING NUSA TENGGARA TIMUR 103 Phase 3 19 16 131 3.5 120.56336 -8.77004 19061 5304061002 TUAFANU NUSA TENGGARA TIMUR 128 Phase 3 38 26 714 5.8 124.39853 -10.16210 19062 5315030012 SIRU NUSA TENGGARA TIMUR 40 Phase 3 9 7 641 1.6 120.16322 -8.69059 19063 5304072003 NOE NONI NUSA TENGGARA TIMUR 25 Phase 3 7 4 921 1.1 124.37580 -9.77518 19064 5312082004 NGINAMANU NUSA TENGGARA TIMUR 92 Phase 3 18 15 282 3.3 120.90359 -8.64347 19065 5304072003 NOE NONI NUSA TENGGARA TIMUR 61 Phase 3 17 11 951 2.6 124.37414 -9.77303 19066 5315010005 WARLOKA NUSA TENGGARA TIMUR 124 Phase 3 31 26 319 5.7 119.84187 -8.63043 19067 5304042006 OOF NUSA TENGGARA TIMUR 85 Phase 3 18 12 654 2.7 124.32809 -9.80953 19068 5315030006 SURUNUMBENG NUSA TENGGARA TIMUR 348 Phase 3 76 64 524 13.9 120.18130 -8.78760 19069 5303100006 OTAN NUSA TENGGARA TIMUR 84 Phase 3 21 14 763 3.2 123.38226 -10.18476 19070 5318040014 WEA AU NUSA TENGGARA TIMUR 111 Phase 3 26 22 074 4.8 121.23514 -8.79548 19071 5305025005 TES NUSA TENGGARA TIMUR 68 Phase 3 17 11 951 2.6 124.40011 -9.38742 19072 5312010001 WAEBELA NUSA TENGGARA TIMUR 183 Phase 3 45 38 205 8.2 120.99117 -8.94729 19073 5304020005 BILOTO NUSA TENGGARA TIMUR 81 Phase 3 20 14 060 3.0 124.17214 -9.86352 19074 5319020013 PAAN LELENG NUSA TENGGARA TIMUR 107 Phase 3 24 20 376 4.4 120.67338 -8.73332 19075 5304020005 BILOTO NUSA TENGGARA TIMUR 45 Phase 3 11 7 733 1.7 124.17441 -9.86506 19076 5312010018 HEAWEA NUSA TENGGARA TIMUR 283 Phase 3 75 63 675 13.7 120.88409 -8.74742 19077 5304010017 FATUKOTO NUSA TENGGARA TIMUR 18 Phase 3 5 3 515 0.8 124.22594 -9.69825 19078 5312010018 HEAWEA NUSA TENGGARA TIMUR 186 Phase 3 49 41 601 9.0 120.88183 -8.74938 19079 5304010003 LELOBOKO NUSA TENGGARA TIMUR 18 Phase 3 5 3 515 0.8 124.22646 -9.69823 19080 5318030002 PODENURA NUSA TENGGARA TIMUR 11 Phase 3 3 2 547 0.5 121.36862 -8.87488 19081 5304080007 PISAN NUSA TENGGARA TIMUR 30 Phase 3 9 6 327 1.4 124.58856 -9.73292 19082 5311051005 TENDA NUSA TENGGARA TIMUR 41 Phase 3 11 9 339 2.0 121.83913 -8.80053 19083 5304080007 PISAN NUSA TENGGARA TIMUR 92 Phase 3 26 18 278 3.9 124.57997 -9.73300 19084 5311051004 KEL. WOLOJITA NUSA TENGGARA TIMUR 89 Phase 3 28 23 772 5.1 121.83562 -8.80467 19085 5303131008 TOOBAUN NUSA TENGGARA TIMUR 101 Phase 3 25 17 575 3.8 123.75185 -10.28382 19086 5311062002 DETUMBEWA NUSA TENGGARA TIMUR 93 Phase 3 23 19 527 4.2 121.80511 -8.58914 19087 5304082004 NUNFUTU NUSA TENGGARA TIMUR 26 Phase 3 6 4 218 0.9 124.62672 -9.61532 19088 5315030011 TANGGE NUSA TENGGARA TIMUR 122 Phase 3 28 23 772 5.1 120.10347 -8.72122 19089 5304080010 NIFUKIU NUSA TENGGARA TIMUR 133 Phase 3 36 25 308 5.5 124.61283 -9.62212 19090 5319060007 GOLO MUNGA NUSA TENGGARA TIMUR 86 Phase 3 22 18 678 4.0 120.54150 -8.42209 19091 5304080010 NIFUKIU NUSA TENGGARA TIMUR 15 Phase 3 5 3 515 0.8 124.60897 -9.62422 19092 5312070017 WOLOLIKA NUSA TENGGARA TIMUR 8 Phase 3 2 1 698 0.4 121.02437 -8.73498 19093 5304080010 NIFUKIU NUSA TENGGARA TIMUR 4 Phase 3 2 1 406 0.3 124.60877 -9.62490 19094 5312070017 WOLOLIKA NUSA TENGGARA TIMUR 48 Phase 3 12 10 188 2.2 121.02635 -8.73463 Annex II – Demand forecast results Page 107 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 19095 5304080010 NIFUKIU NUSA TENGGARA TIMUR 68 Phase 3 19 13 357 2.9 124.60782 -9.62622 19096 5312070017 WOLOLIKA NUSA TENGGARA TIMUR 139 Phase 3 32 27 168 5.9 121.02907 -8.73284 19097 5304080010 NIFUKIU NUSA TENGGARA TIMUR 27 Phase 3 8 5 624 1.2 124.60598 -9.62846 19098 5315020001 MATA WAE NUSA TENGGARA TIMUR 197 Phase 3 47 39 903 8.6 119.91488 -8.71313 19099 5303141001 PATHAU NUSA TENGGARA TIMUR 120 Phase 3 34 23 902 5.2 124.01612 -10.15486 19100 5315020001 MATA WAE NUSA TENGGARA TIMUR 79 Phase 3 19 16 131 3.5 119.91411 -8.71557 19101 5303170002 NOELMINA NUSA TENGGARA TIMUR 161 Phase 3 45 31 635 6.8 124.07593 -9.99778 19102 5315020001 MATA WAE NUSA TENGGARA TIMUR 521 Phase 3 123 104 427 22.5 119.92109 -8.71885 19103 5303170002 NOELMINA NUSA TENGGARA TIMUR 73 Phase 3 21 14 763 3.2 124.07693 -9.99948 19104 5318070001 ANAKOLI NUSA TENGGARA TIMUR 375 Phase 3 80 67 920 14.7 121.40279 -8.59072 19105 5304080008 MNELAANEN NUSA TENGGARA TIMUR 31 Phase 3 8 5 624 1.2 124.62423 -9.69937 19106 5318030003 TONGGO NUSA TENGGARA TIMUR 80 Phase 3 24 20 376 4.4 121.36942 -8.86489 19107 5304080008 MNELAANEN NUSA TENGGARA TIMUR 55 Phase 3 15 10 545 2.3 124.62226 -9.70328 19108 5319020006 GUNUNG MUTE NUSA TENGGARA TIMUR 206 Phase 3 56 47 544 10.3 120.79568 -8.72040 19109 5304030013 NOEMETO NUSA TENGGARA TIMUR 106 Phase 3 23 16 169 3.5 124.28339 -9.87652 19110 5319020006 GUNUNG MUTE NUSA TENGGARA TIMUR 139 Phase 3 38 32 262 7.0 120.79444 -8.71324 19111 5304020005 BILOTO NUSA TENGGARA TIMUR 28 Phase 3 7 4 921 1.1 124.17634 -9.86623 19112 5313140014 WANGKUNG NUSA TENGGARA TIMUR 177 Phase 3 40 33 960 7.3 120.45146 -8.26913 19113 5306012002 ALKANI NUSA TENGGARA TIMUR 105 Phase 3 24 16 872 3.6 124.81350 -9.74796 19114 5319040005 BUTI NUSA TENGGARA TIMUR 64 Phase 3 16 13 584 2.9 120.70316 -8.50105 19115 5304042006 OOF NUSA TENGGARA TIMUR 51 Phase 3 11 7 733 1.7 124.35036 -9.80876 19116 5312071001 TARAWAJA NUSA TENGGARA TIMUR 75 Phase 3 21 17 829 3.8 121.04334 -8.74262 19117 5304042006 OOF NUSA TENGGARA TIMUR 43 Phase 3 10 7 030 1.5 124.35086 -9.80930 19118 5312030016 MANGULEWA NUSA TENGGARA TIMUR 14 Phase 3 4 3 396 0.7 121.04703 -8.74984 19119 5306032005 FATURIKA NUSA TENGGARA TIMUR 136 Phase 3 35 24 605 5.3 124.95729 -9.34017 19120 5312030016 MANGULEWA NUSA TENGGARA TIMUR 37 Phase 3 8 6 792 1.5 121.04679 -8.75045 19121 5306032005 FATURIKA NUSA TENGGARA TIMUR 109 Phase 3 28 19 684 4.2 124.96894 -9.34084 19122 5312030016 MANGULEWA NUSA TENGGARA TIMUR 51 Phase 3 12 10 188 2.2 121.05662 -8.75197 19123 5306032006 RAFAE NUSA TENGGARA TIMUR 101 Phase 3 21 14 763 3.2 124.88542 -9.33511 19124 5312030016 MANGULEWA NUSA TENGGARA TIMUR 70 Phase 3 16 13 584 2.9 121.06363 -8.75462 19125 5306032006 RAFAE NUSA TENGGARA TIMUR 109 Phase 3 22 15 466 3.3 124.88743 -9.33845 19126 5312030016 MANGULEWA NUSA TENGGARA TIMUR 41 Phase 3 9 7 641 1.6 121.06642 -8.75283 19127 5304020005 BILOTO NUSA TENGGARA TIMUR 72 Phase 3 18 12 654 2.7 124.18619 -9.87172 19128 5312030016 MANGULEWA NUSA TENGGARA TIMUR 76 Phase 3 17 14 433 3.1 121.06830 -8.75412 19129 5304020005 BILOTO NUSA TENGGARA TIMUR 71 Phase 3 18 12 654 2.7 124.18961 -9.87368 19130 5312030016 MANGULEWA NUSA TENGGARA TIMUR 150 Phase 3 33 28 017 6.0 121.06929 -8.75160 19131 5304050011 KIUBAAT NUSA TENGGARA TIMUR 37 Phase 3 10 7 030 1.5 124.29680 -10.02376 19132 5312030020 SANGADETO NUSA TENGGARA TIMUR 17 Phase 3 4 3 396 0.7 121.07628 -8.74328 19133 5304050011 KIUBAAT NUSA TENGGARA TIMUR 91 Phase 3 23 16 169 3.5 124.30566 -10.02621 19134 5312030020 SANGADETO NUSA TENGGARA TIMUR 20 Phase 3 5 4 245 0.9 121.07969 -8.74231 19135 5304051004 NAIP NUSA TENGGARA TIMUR 160 Phase 3 31 21 793 4.7 124.31841 -10.02580 19136 5312030020 SANGADETO NUSA TENGGARA TIMUR 26 Phase 3 6 5 094 1.1 121.07962 -8.74739 19137 5305043005 SONE NUSA TENGGARA TIMUR 129 Phase 3 42 29 526 6.4 124.60715 -9.34665 19138 5312030020 SANGADETO NUSA TENGGARA TIMUR 13 Phase 3 3 2 547 0.5 121.08070 -8.75197 19139 5305043005 SONE NUSA TENGGARA TIMUR 46 Phase 3 15 10 545 2.3 124.61214 -9.33865 19140 5312030016 MANGULEWA NUSA TENGGARA TIMUR 28 Phase 3 7 5 943 1.3 121.07936 -8.75739 19141 5305043005 SONE NUSA TENGGARA TIMUR 85 Phase 3 28 19 684 4.2 124.61045 -9.33717 19142 5312030016 MANGULEWA NUSA TENGGARA TIMUR 68 Phase 3 15 12 735 2.7 121.08025 -8.76190 19143 5304013002 LILIANA NUSA TENGGARA TIMUR 20 Phase 3 6 4 218 0.9 124.13552 -9.70716 19144 5312030020 SANGADETO NUSA TENGGARA TIMUR 313 Phase 3 67 56 883 12.3 121.09189 -8.76716 19145 5303101004 ONANSILA NUSA TENGGARA TIMUR 69 Phase 3 18 12 654 2.7 123.40340 -10.24140 19146 5312030020 SANGADETO NUSA TENGGARA TIMUR 145 Phase 3 32 27 168 5.9 121.09361 -8.75945 19147 5303121008 BAUMATA UTARA NUSA TENGGARA TIMUR 104 Phase 3 24 16 872 3.6 123.68432 -10.18114 19148 5312030020 SANGADETO NUSA TENGGARA TIMUR 17 Phase 3 4 3 396 0.7 121.07396 -8.74157 19149 5304030013 NOEMETO NUSA TENGGARA TIMUR 70 Phase 3 15 10 545 2.3 124.28466 -9.88273 19150 5312030020 SANGADETO NUSA TENGGARA TIMUR 56 Phase 3 12 10 188 2.2 121.07629 -8.73978 19151 5303162005 TUAKAU NUSA TENGGARA TIMUR 182 Phase 3 41 28 823 6.2 123.68342 -9.73413 19152 5312030020 SANGADETO NUSA TENGGARA TIMUR 10 Phase 3 3 2 547 0.5 121.08247 -8.74214 19153 5303162005 TUAKAU NUSA TENGGARA TIMUR 69 Phase 3 16 11 248 2.4 123.68352 -9.73709 19154 5312030020 SANGADETO NUSA TENGGARA TIMUR 83 Phase 3 18 15 282 3.3 121.08615 -8.74228 19155 5303162005 TUAKAU NUSA TENGGARA TIMUR 157 Phase 3 36 25 308 5.5 123.68687 -9.74249 19156 5312030020 SANGADETO NUSA TENGGARA TIMUR 13 Phase 3 3 2 547 0.5 121.08527 -8.73858 19157 5305050007 TAUTPAH NUSA TENGGARA TIMUR 16 Phase 3 5 3 515 0.8 124.74411 -9.29721 19158 5312071002 LOA NUSA TENGGARA TIMUR 162 Phase 3 31 26 319 5.7 121.08597 -8.73006 19159 5305050007 TAUTPAH NUSA TENGGARA TIMUR 38 Phase 3 11 7 733 1.7 124.74283 -9.29657 19160 5319010014 GOLO MELENG NUSA TENGGARA TIMUR 76 Phase 3 15 12 735 2.7 120.59039 -8.72048 19161 5305050007 TAUTPAH NUSA TENGGARA TIMUR 75 Phase 3 22 15 466 3.3 124.74052 -9.29617 19162 5319010014 GOLO MELENG NUSA TENGGARA TIMUR 159 Phase 3 31 26 319 5.7 120.59266 -8.72908 19163 5304023002 OELBUBUK NUSA TENGGARA TIMUR 160 Phase 3 39 27 417 5.9 124.26219 -9.76705 19164 5319010014 GOLO MELENG NUSA TENGGARA TIMUR 91 Phase 3 18 15 282 3.3 120.59951 -8.73007 19165 5303170007 TANINI NUSA TENGGARA TIMUR 300 Phase 3 76 53 428 11.5 123.86039 -9.81141 19166 5319010001 BEA NGENCUNG NUSA TENGGARA TIMUR 46 Phase 3 11 9 339 2.0 120.51481 -8.76480 19167 5303180001 FATUSUKI NUSA TENGGARA TIMUR 247 Phase 3 51 35 853 7.7 123.86259 -9.77769 19168 5319010001 BEA NGENCUNG NUSA TENGGARA TIMUR 71 Phase 3 17 14 433 3.1 120.51213 -8.77080 19169 5303180001 FATUSUKI NUSA TENGGARA TIMUR 120 Phase 3 25 17 575 3.8 123.86172 -9.77489 19170 5319010001 BEA NGENCUNG NUSA TENGGARA TIMUR 148 Phase 3 35 29 715 6.4 120.51491 -8.77147 19171 5303180001 FATUSUKI NUSA TENGGARA TIMUR 204 Phase 3 42 29 526 6.4 123.86610 -9.77313 19172 5319040011 NANGA MBAUR NUSA TENGGARA TIMUR 38 Phase 3 6 5 094 1.1 120.79574 -8.34311 19173 5304010006 NETPALA NUSA TENGGARA TIMUR 73 Phase 3 15 10 545 2.3 124.25785 -9.73438 19174 5315020013 WATU WANGKA NUSA TENGGARA TIMUR 95 Phase 3 23 19 527 4.2 120.12553 -8.57973 19175 5304072004 HOI NUSA TENGGARA TIMUR 85 Phase 3 23 16 169 3.5 124.44815 -9.77841 19176 5315020013 WATU WANGKA NUSA TENGGARA TIMUR 17 Phase 3 5 4 245 0.9 120.12490 -8.58015 19177 5305052006 OEPUAH UTARA NUSA TENGGARA TIMUR 60 Phase 3 14 9 842 2.1 124.58435 -9.16522 19178 5315020013 WATU WANGKA NUSA TENGGARA TIMUR 69 Phase 3 17 14 433 3.1 120.11766 -8.58388 19179 5305041006 HUMUSU A NUSA TENGGARA TIMUR 199 Phase 3 47 33 041 7.1 124.59287 -9.27101 Annex II – Demand forecast results Page 108 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 19180 5315020013 WATU WANGKA NUSA TENGGARA TIMUR 173 Phase 3 41 34 809 7.5 120.10914 -8.57851 19181 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 33 Phase 3 9 6 327 1.4 124.14925 -9.72538 19182 5311071014 DETUBELA NUSA TENGGARA TIMUR 64 Phase 3 16 13 584 2.9 121.74420 -8.65407 19183 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 29 Phase 3 8 5 624 1.2 124.14705 -9.72311 19184 5311071014 DETUBELA NUSA TENGGARA TIMUR 102 Phase 3 24 20 376 4.4 121.74491 -8.65050 19185 5303130013 NONBES NUSA TENGGARA TIMUR 45 Phase 3 10 7 030 1.5 123.82574 -10.19787 19186 5311071014 DETUBELA NUSA TENGGARA TIMUR 90 Phase 3 22 18 678 4.0 121.74322 -8.64671 19187 5304022004 SALBAIT NUSA TENGGARA TIMUR 33 Phase 3 10 7 030 1.5 124.15500 -9.86856 19188 5311071014 DETUBELA NUSA TENGGARA TIMUR 200 Phase 3 48 40 752 8.8 121.75339 -8.65395 19189 5304022004 SALBAIT NUSA TENGGARA TIMUR 60 Phase 3 17 11 951 2.6 124.15450 -9.86985 19190 5315020002 WAE SANO NUSA TENGGARA TIMUR 130 Phase 3 31 26 319 5.7 120.01274 -8.69248 19191 5304022004 SALBAIT NUSA TENGGARA TIMUR 22 Phase 3 7 4 921 1.1 124.14682 -9.87307 19192 5311063002 NGGUMBELAKA NUSA TENGGARA TIMUR 19 Phase 3 6 5 094 1.1 121.83459 -8.68483 19193 5304022004 SALBAIT NUSA TENGGARA TIMUR 78 Phase 3 22 15 466 3.3 124.14600 -9.87455 19194 5311063003 MUKUREKU NUSA TENGGARA TIMUR 24 Phase 3 12 10 188 2.2 121.83461 -8.68438 19195 5304022004 SALBAIT NUSA TENGGARA TIMUR 93 Phase 3 26 18 278 3.9 124.14438 -9.87647 19196 5311063003 MUKUREKU NUSA TENGGARA TIMUR 99 Phase 3 49 41 601 9.0 121.84461 -8.67121 19197 5304013001 NOEBESI NUSA TENGGARA TIMUR 69 Phase 3 17 11 951 2.6 124.07279 -9.63933 19198 5311063003 MUKUREKU NUSA TENGGARA TIMUR 29 Phase 3 15 12 735 2.7 121.84570 -8.66892 19199 5304013001 NOEBESI NUSA TENGGARA TIMUR 138 Phase 3 33 23 199 5.0 124.07115 -9.64015 19200 5310012012 BU WATUWETI NUSA TENGGARA TIMUR 57 Phase 3 17 14 433 3.1 121.95063 -8.69678 19201 5303180003 OHAEM I NUSA TENGGARA TIMUR 14 Phase 3 4 2 812 0.6 124.03192 -9.75068 19202 5319060009 GOLO LEMBUR NUSA TENGGARA TIMUR 121 Phase 3 28 23 772 5.1 120.63577 -8.46610 19203 5303170005 KAUNIKI NUSA TENGGARA TIMUR 88 Phase 3 20 14 060 3.0 124.03127 -9.76002 19204 5319050010 NGKIONG DORA NUSA TENGGARA TIMUR 48 Phase 3 12 10 188 2.2 120.65752 -8.55101 19205 5303170005 KAUNIKI NUSA TENGGARA TIMUR 76 Phase 3 17 11 951 2.6 124.03142 -9.76220 19206 5310071003 REROROJA NUSA TENGGARA TIMUR 43 Phase 3 10 8 490 1.8 122.02970 -8.54560 19207 5303170005 KAUNIKI NUSA TENGGARA TIMUR 67 Phase 3 15 10 545 2.3 124.03364 -9.76709 19208 5319060015 LIANG DERUK NUSA TENGGARA TIMUR 24 Phase 3 7 5 943 1.3 120.48615 -8.37033 19209 5303170005 KAUNIKI NUSA TENGGARA TIMUR 238 Phase 3 52 36 556 7.9 124.03111 -9.76968 19210 5319060015 LIANG DERUK NUSA TENGGARA TIMUR 112 Phase 3 33 28 017 6.0 120.48653 -8.37823 19211 5304042006 OOF NUSA TENGGARA TIMUR 46 Phase 3 10 7 030 1.5 124.35021 -9.81393 19212 5315010002 PAPA GARANG NUSA TENGGARA TIMUR 72 Phase 3 19 16 131 3.5 119.72308 -8.57071 19213 5304042006 OOF NUSA TENGGARA TIMUR 46 Phase 3 10 7 030 1.5 124.34857 -9.82214 19214 5315010002 PAPA GARANG NUSA TENGGARA TIMUR 1 183 Phase 3 308 261 492 56.4 119.71023 -8.57079 19215 5304042006 OOF NUSA TENGGARA TIMUR 79 Phase 3 17 11 951 2.6 124.34619 -9.82488 19216 5318070001 ANAKOLI NUSA TENGGARA TIMUR 128 Phase 3 28 23 772 5.1 121.41227 -8.58235 19217 5305061008 OEMANU NUSA TENGGARA TIMUR 42 Phase 3 10 7 030 1.5 124.67278 -9.14109 19218 5312010008 KELITEI NUSA TENGGARA TIMUR 83 Phase 3 23 19 527 4.2 120.94689 -8.93875 19219 5305061008 OEMANU NUSA TENGGARA TIMUR 38 Phase 3 10 7 030 1.5 124.67082 -9.13784 19220 5311020020 TONGGOPAPA NUSA TENGGARA TIMUR 149 Phase 3 37 31 413 6.8 121.59541 -8.74371 19221 5305061007 PONU NUSA TENGGARA TIMUR 4 Phase 3 2 1 406 0.3 124.67502 -9.13602 19222 5319040006 GOLO WANGKUNG NUSA TENGGARA TIMUR 18 Phase 3 5 4 245 0.9 120.69432 -8.49340 19223 5305061008 OEMANU NUSA TENGGARA TIMUR 47 Phase 3 12 8 436 1.8 124.67544 -9.13558 19224 5319040006 GOLO WANGKUNG NUSA TENGGARA TIMUR 26 Phase 3 6 5 094 1.1 120.69004 -8.49025 19225 5305061007 PONU NUSA TENGGARA TIMUR 17 Phase 3 5 3 515 0.8 124.67437 -9.12543 19226 5319040006 GOLO WANGKUNG NUSA TENGGARA TIMUR 115 Phase 3 27 22 923 4.9 120.68567 -8.49014 19227 5305061008 OEMANU NUSA TENGGARA TIMUR 9 Phase 3 3 2 109 0.5 124.67397 -9.12521 19228 5319040007 LADA MESE NUSA TENGGARA TIMUR 50 Phase 3 13 11 037 2.4 120.68684 -8.48285 19229 5305061008 OEMANU NUSA TENGGARA TIMUR 14 Phase 3 4 2 812 0.6 124.67377 -9.12479 19230 5319040007 LADA MESE NUSA TENGGARA TIMUR 84 Phase 3 21 17 829 3.8 120.68628 -8.48121 19231 5305061007 PONU NUSA TENGGARA TIMUR 38 Phase 3 10 7 030 1.5 124.67425 -9.11766 19232 5319050022 WATU ARUS NUSA TENGGARA TIMUR 56 Phase 3 13 11 037 2.4 120.60327 -8.52236 19233 5305061007 PONU NUSA TENGGARA TIMUR 122 Phase 3 32 22 496 4.9 124.67270 -9.11553 19234 5310011005 GERA NUSA TENGGARA TIMUR 49 Phase 3 13 11 037 2.4 122.06821 -8.65834 19235 5305024005 NAINABAN NUSA TENGGARA TIMUR 21 Phase 3 6 4 218 0.9 124.37331 -9.45369 19236 5313140005 LOCE NUSA TENGGARA TIMUR 40 Phase 3 9 7 641 1.6 120.37812 -8.34856 19237 5304080004 MAULEUM NUSA TENGGARA TIMUR 98 Phase 3 29 20 387 4.4 124.56892 -9.74033 19238 5313140005 LOCE NUSA TENGGARA TIMUR 127 Phase 3 28 23 772 5.1 120.39068 -8.34844 19239 5305025005 TES NUSA TENGGARA TIMUR 9 Phase 3 3 2 109 0.5 124.39984 -9.38609 19240 5313140005 LOCE NUSA TENGGARA TIMUR 32 Phase 3 8 6 792 1.5 120.39477 -8.34823 19241 5306080014 MAKIR NUSA TENGGARA TIMUR 28 Phase 3 8 5 624 1.2 125.15329 -9.03748 19242 5313140005 LOCE NUSA TENGGARA TIMUR 153 Phase 3 34 28 866 6.2 120.40463 -8.34183 19243 5306013001 FOREKMODOK NUSA TENGGARA TIMUR 59 Phase 3 13 9 139 2.0 124.91355 -9.60102 19244 5311054001 SERANDORI NUSA TENGGARA TIMUR 80 Phase 3 21 17 829 3.8 121.93141 -8.81688 19245 5306013011 WEDEROK NUSA TENGGARA TIMUR 49 Phase 3 11 7 733 1.7 124.91293 -9.60129 19246 5311010018 JEGHARANGGA NUSA TENGGARA TIMUR 88 Phase 3 23 19 527 4.2 121.55115 -8.77931 19247 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 38 Phase 3 11 7 733 1.7 124.25789 -9.83018 19248 5311050006 MBULIWARALAU NUSA TENGGARA TIMUR 41 Phase 3 12 10 188 2.2 121.89296 -8.80843 19249 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 56 Phase 3 16 11 248 2.4 124.26307 -9.82690 19250 5311061012 LISELANDE NUSA TENGGARA TIMUR 84 Phase 3 21 17 829 3.8 121.92633 -8.62158 19251 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 37 Phase 3 11 7 733 1.7 124.26352 -9.82366 19252 5310012013 LOKE NUSA TENGGARA TIMUR 121 Phase 3 20 16 980 3.7 121.97924 -8.66483 19253 5304051006 OEBAKI NUSA TENGGARA TIMUR 64 Phase 3 16 11 248 2.4 124.39528 -9.97776 19254 5312030016 MANGULEWA NUSA TENGGARA TIMUR 113 Phase 3 25 21 225 4.6 121.03114 -8.77857 19255 5304020006 BISENE NUSA TENGGARA TIMUR 15 Phase 3 5 3 515 0.8 124.16471 -9.81732 19256 5315020019 WAE LOLOS NUSA TENGGARA TIMUR 67 Phase 3 16 13 584 2.9 120.00428 -8.61698 19257 5303180010 OELBANU NUSA TENGGARA TIMUR 295 Phase 3 66 46 398 10.0 123.88492 -9.70429 19258 5310061003 RERUWAIRERE NUSA TENGGARA TIMUR 41 Phase 3 13 11 037 2.4 121.73703 -8.31726 19259 5306031002 TNIUMANU NUSA TENGGARA TIMUR 85 Phase 3 20 14 060 3.0 124.80272 -9.39903 19260 5312030008 MALANUZA NUSA TENGGARA TIMUR 254 Phase 3 34 28 866 6.2 121.08582 -8.79939 19261 5306031002 TNIUMANU NUSA TENGGARA TIMUR 99 Phase 3 23 16 169 3.5 124.80865 -9.40684 19262 5312030020 SANGADETO NUSA TENGGARA TIMUR 115 Phase 3 25 21 225 4.6 121.08636 -8.78780 19263 5305040006 NANSEAN NUSA TENGGARA TIMUR 171 Phase 3 70 49 210 10.6 124.65872 -9.52103 19264 5319060014 NAMPAR TABANG NUSA TENGGARA TIMUR 165 Phase 3 37 31 413 6.8 120.54212 -8.35110 Annex II – Demand forecast results Page 109 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 19265 5303160014 KIUONI NUSA TENGGARA TIMUR 53 Phase 3 13 9 139 2.0 123.95513 -9.90121 19266 5319020001 TANAH RATA NUSA TENGGARA TIMUR 126 Phase 3 29 24 621 5.3 120.66730 -8.81994 19267 5306080015 LAMAK SENULU NUSA TENGGARA TIMUR 157 Phase 3 46 32 338 7.0 125.17162 -9.02494 19268 5312080013 NANGAMESE NUSA TENGGARA TIMUR 14 Phase 3 4 3 396 0.7 121.03075 -8.41461 19269 5304020006 BISENE NUSA TENGGARA TIMUR 5 Phase 3 2 1 406 0.3 124.15336 -9.81980 19270 5319060006 GORENG MENI NUSA TENGGARA TIMUR 74 Phase 3 26 22 074 4.8 120.53760 -8.44820 19271 5304020006 BISENE NUSA TENGGARA TIMUR 15 Phase 3 5 3 515 0.8 124.15322 -9.81930 19272 5313120029 BANGKA LAO NUSA TENGGARA TIMUR 107 Phase 3 24 20 376 4.4 120.40123 -8.61738 19273 5304020006 BISENE NUSA TENGGARA TIMUR 16 Phase 3 5 3 515 0.8 124.14779 -9.81778 19274 5315020019 WAE LOLOS NUSA TENGGARA TIMUR 103 Phase 3 24 20 376 4.4 119.99276 -8.61718 19275 5304020006 BISENE NUSA TENGGARA TIMUR 114 Phase 3 34 23 902 5.2 124.14630 -9.82211 19276 5311010011 TENDAMBEPA NUSA TENGGARA TIMUR 254 Phase 3 27 22 923 4.9 121.43490 -8.67943 19277 5305043005 SONE NUSA TENGGARA TIMUR 18 Phase 3 6 4 218 0.9 124.61673 -9.37299 19278 5315031006 LALE NUSA TENGGARA TIMUR 131 Phase 3 29 24 621 5.3 120.20771 -8.63342 19279 5305043005 SONE NUSA TENGGARA TIMUR 32 Phase 3 11 7 733 1.7 124.61594 -9.37468 19280 5310012014 RENGGARASI NUSA TENGGARA TIMUR 39 Phase 3 8 6 792 1.5 121.98695 -8.70445 19281 5305043005 SONE NUSA TENGGARA TIMUR 150 Phase 3 49 34 447 7.4 124.61448 -9.37587 19282 5310012014 RENGGARASI NUSA TENGGARA TIMUR 129 Phase 3 26 22 074 4.8 121.98087 -8.70501 19283 5305042004 ATMEN NUSA TENGGARA TIMUR 16 Phase 3 8 5 624 1.2 124.60428 -9.50144 19284 5311051004 KEL. WOLOJITA NUSA TENGGARA TIMUR 45 Phase 3 14 11 886 2.6 121.85667 -8.82287 19285 5305042004 ATMEN NUSA TENGGARA TIMUR 27 Phase 3 14 9 842 2.1 124.60602 -9.50260 19286 5311051004 KEL. WOLOJITA NUSA TENGGARA TIMUR 44 Phase 3 14 11 886 2.6 121.86097 -8.82402 19287 5305042004 ATMEN NUSA TENGGARA TIMUR 11 Phase 3 6 4 218 0.9 124.60849 -9.50736 19288 5319040008 NANGA BARAS NUSA TENGGARA TIMUR 78 Phase 3 17 14 433 3.1 120.68543 -8.33818 19289 5305042004 ATMEN NUSA TENGGARA TIMUR 29 Phase 3 15 10 545 2.3 124.60725 -9.50806 19290 5319060011 LENCUR NUSA TENGGARA TIMUR 276 Phase 3 56 47 544 10.3 120.68463 -8.33272 19291 5305042004 ATMEN NUSA TENGGARA TIMUR 15 Phase 3 8 5 624 1.2 124.60966 -9.50835 19292 5311071015 NUMBA NUSA TENGGARA TIMUR 87 Phase 3 18 15 282 3.3 121.68462 -8.65810 19293 5306010032 RABASA HAERAIN NUSA TENGGARA TIMUR 102 Phase 3 28 19 684 4.2 124.89938 -9.68191 19294 5319060001 TENGKULAWAR NUSA TENGGARA TIMUR 59 Phase 3 20 16 980 3.7 120.56098 -8.49364 19295 5305022006 MAURISU UTARA NUSA TENGGARA TIMUR 24 Phase 3 6 4 218 0.9 124.56785 -9.53884 19296 5313140015 ROBEK NUSA TENGGARA TIMUR 43 Phase 3 11 9 339 2.0 120.41243 -8.27891 19297 5305022006 MAURISU UTARA NUSA TENGGARA TIMUR 143 Phase 3 35 24 605 5.3 124.57908 -9.54345 19298 5313041002 SATAR RUWUK NUSA TENGGARA TIMUR 91 Phase 3 20 16 980 3.7 120.27561 -8.82141 19299 5305040013 MANUNAIN B NUSA TENGGARA TIMUR 67 Phase 3 19 13 357 2.9 124.66546 -9.42166 19300 5319030011 LEMPANG PAJI NUSA TENGGARA TIMUR 147 Phase 3 37 31 413 6.8 120.84310 -8.49309 19301 5304061001 TOINEKE NUSA TENGGARA TIMUR 32 Phase 3 8 5 624 1.2 124.36696 -10.12933 19302 5315050008 NGGILAT NUSA TENGGARA TIMUR 187 Phase 3 47 39 903 8.6 120.28496 -8.36849 19303 5304061001 TOINEKE NUSA TENGGARA TIMUR 70 Phase 3 17 11 951 2.6 124.36636 -10.12679 19304 5310010008 LENANDARETA NUSA TENGGARA TIMUR 33 Phase 3 10 8 490 1.8 121.99151 -8.74966 19305 5304051002 TEAS NUSA TENGGARA TIMUR 40 Phase 3 11 7 733 1.7 124.31844 -9.94911 19306 5319040007 LADA MESE NUSA TENGGARA TIMUR 79 Phase 3 20 16 980 3.7 120.68094 -8.47988 19307 5304051002 TEAS NUSA TENGGARA TIMUR 78 Phase 3 21 14 763 3.2 124.32688 -9.95372 19308 5319050024 COMPANG WUNIS NUSA TENGGARA TIMUR 65 Phase 3 18 15 282 3.3 120.64408 -8.49926 19309 5305040009 LOERAM NUSA TENGGARA TIMUR 223 Phase 3 59 41 477 8.9 124.76540 -9.45538 19310 5315030004 REPI NUSA TENGGARA TIMUR 190 Phase 3 36 30 564 6.6 120.24702 -8.79576 19311 5304080012 BILLA NUSA TENGGARA TIMUR 33 Phase 3 11 7 733 1.7 124.54550 -9.67190 19312 5311071005 AEMURI NUSA TENGGARA TIMUR 182 Phase 3 41 34 809 7.5 121.64937 -8.50351 19313 5304080012 BILLA NUSA TENGGARA TIMUR 63 Phase 3 20 14 060 3.0 124.54584 -9.66848 19314 5311071005 AEMURI NUSA TENGGARA TIMUR 142 Phase 3 32 27 168 5.9 121.64697 -8.50244 19315 5305052003 MATABESI NUSA TENGGARA TIMUR 11 Phase 3 4 2 812 0.6 124.64947 -9.24397 19316 5311071005 AEMURI NUSA TENGGARA TIMUR 84 Phase 3 19 16 131 3.5 121.65004 -8.50165 19317 5305052003 MATABESI NUSA TENGGARA TIMUR 55 Phase 3 18 12 654 2.7 124.65063 -9.24014 19318 5319010004 GOLO KANTAR NUSA TENGGARA TIMUR 105 Phase 3 23 19 527 4.2 120.59112 -8.74499 19319 5305052004 KAUBELE NUSA TENGGARA TIMUR 107 Phase 3 28 19 684 4.2 124.64889 -9.23841 19320 5315020001 MATA WAE NUSA TENGGARA TIMUR 381 Phase 3 90 76 410 16.5 119.90576 -8.76044 19321 5305052004 KAUBELE NUSA TENGGARA TIMUR 123 Phase 3 32 22 496 4.9 124.64678 -9.23344 19322 5319040006 GOLO WANGKUNG NUSA TENGGARA TIMUR 46 Phase 3 11 9 339 2.0 120.64911 -8.48960 19323 5306011014 RAISAMANE NUSA TENGGARA TIMUR 22 Phase 3 6 4 218 0.9 124.80551 -9.62698 19324 5319040007 LADA MESE NUSA TENGGARA TIMUR 66 Phase 3 17 14 433 3.1 120.64676 -8.48547 19325 5306011001 SAENAMA NUSA TENGGARA TIMUR 18 Phase 3 5 3 515 0.8 124.80539 -9.62758 19326 5319040007 LADA MESE NUSA TENGGARA TIMUR 46 Phase 3 12 10 188 2.2 120.65383 -8.48817 19327 5306012002 ALKANI NUSA TENGGARA TIMUR 80 Phase 3 19 13 357 2.9 124.84046 -9.73524 19328 5318070005 TENDA KINDE NUSA TENGGARA TIMUR 10 Phase 3 3 2 547 0.5 121.52204 -8.63013 19329 5306012010 WESEBEN NUSA TENGGARA TIMUR 56 Phase 3 13 9 139 2.0 124.84061 -9.73337 19330 5311012003 KEBIRANGGA NUSA TENGGARA TIMUR 31 Phase 3 7 5 943 1.3 121.52251 -8.63041 19331 5305061009 NIFUTASI NUSA TENGGARA TIMUR 45 Phase 3 13 9 139 2.0 124.68647 -9.18704 19332 5311063007 TANIWODA NUSA TENGGARA TIMUR 88 Phase 3 19 16 131 3.5 121.90178 -8.67404 19333 5303180008 LELOBOKO NUSA TENGGARA TIMUR 109 Phase 3 22 15 466 3.3 123.94271 -9.68487 19334 5315030001 NANGA BERE NUSA TENGGARA TIMUR 291 Phase 3 57 48 393 10.4 119.94533 -8.81283 19335 5304080010 NIFUKIU NUSA TENGGARA TIMUR 21 Phase 3 6 4 218 0.9 124.64293 -9.69809 19336 5315030001 NANGA BERE NUSA TENGGARA TIMUR 442 Phase 3 87 73 863 15.9 119.96464 -8.81711 19337 5303190009 FATUNAUS NUSA TENGGARA TIMUR 105 Phase 3 25 17 575 3.8 123.88076 -9.51295 19338 5315030001 NANGA BERE NUSA TENGGARA TIMUR 188 Phase 3 37 31 413 6.8 119.97147 -8.82130 19339 5306070008 SADI NUSA TENGGARA TIMUR 73 Phase 3 20 14 060 3.0 124.92460 -9.06451 19340 5311063007 TANIWODA NUSA TENGGARA TIMUR 92 Phase 3 20 16 980 3.7 121.92674 -8.69171 19341 5304100014 ANIN NUSA TENGGARA TIMUR 90 Phase 3 22 15 466 3.3 124.57995 -9.83724 19342 5311063008 DETUARA NUSA TENGGARA TIMUR 69 Phase 3 19 16 131 3.5 121.93351 -8.68736 19343 5305040013 MANUNAIN B NUSA TENGGARA TIMUR 39 Phase 3 11 7 733 1.7 124.66280 -9.41656 19344 5310071005 DONE NUSA TENGGARA TIMUR 92 Phase 3 22 18 678 4.0 122.03476 -8.59967 19345 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 25 Phase 3 7 4 921 1.1 124.26673 -9.82626 19346 5310071005 DONE NUSA TENGGARA TIMUR 154 Phase 3 37 31 413 6.8 122.04107 -8.60708 19347 5304010014 HALME NUSA TENGGARA TIMUR 223 Phase 3 73 51 319 11.1 124.08539 -9.74515 19348 5318070005 TENDA KINDE NUSA TENGGARA TIMUR 21 Phase 3 6 5 094 1.1 121.50335 -8.63367 19349 5304070017 NOEBESA NUSA TENGGARA TIMUR 4 Phase 3 2 1 406 0.3 124.47690 -9.87649 Annex II – Demand forecast results Page 110 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 19350 5312030016 MANGULEWA NUSA TENGGARA TIMUR 118 Phase 3 26 22 074 4.8 121.05969 -8.76511 19351 5304070016 TUMU NUSA TENGGARA TIMUR 162 Phase 3 44 30 932 6.7 124.47548 -9.87736 19352 5311060024 DETUWULU NUSA TENGGARA TIMUR 149 Phase 3 33 28 017 6.0 121.87788 -8.53970 19353 5304011009 KUANOEL NUSA TENGGARA TIMUR 8 Phase 3 3 2 109 0.5 124.22201 -9.64617 19354 5319040008 NANGA BARAS NUSA TENGGARA TIMUR 392 Phase 3 83 70 467 15.2 120.68940 -8.40335 19355 5305022006 MAURISU UTARA NUSA TENGGARA TIMUR 20 Phase 3 5 3 515 0.8 124.58261 -9.54403 19356 5318030008 DEGALEA NUSA TENGGARA TIMUR 71 Phase 3 17 14 433 3.1 121.31301 -8.80181 19357 5305022006 MAURISU UTARA NUSA TENGGARA TIMUR 77 Phase 3 19 13 357 2.9 124.59119 -9.54141 19358 5318030008 DEGALEA NUSA TENGGARA TIMUR 21 Phase 3 5 4 245 0.9 121.31091 -8.80199 19359 5303170010 FATUKONA NUSA TENGGARA TIMUR 42 Phase 3 9 6 327 1.4 123.94537 -9.88104 19360 5318030008 DEGALEA NUSA TENGGARA TIMUR 40 Phase 3 10 8 490 1.8 121.30994 -8.80313 19361 5303170010 FATUKONA NUSA TENGGARA TIMUR 17 Phase 3 4 2 812 0.6 123.94429 -9.88139 19362 5315030001 NANGA BERE NUSA TENGGARA TIMUR 26 Phase 3 6 5 094 1.1 119.97470 -8.82058 19363 5303170010 FATUKONA NUSA TENGGARA TIMUR 48 Phase 3 10 7 030 1.5 123.92991 -9.87292 19364 5319020001 TANAH RATA NUSA TENGGARA TIMUR 37 Phase 3 9 7 641 1.6 120.65474 -8.84223 19365 5303170010 FATUKONA NUSA TENGGARA TIMUR 95 Phase 3 20 14 060 3.0 123.92421 -9.87051 19366 5319020001 TANAH RATA NUSA TENGGARA TIMUR 204 Phase 3 46 39 054 8.4 120.65542 -8.84699 19367 5303161004 NONBAUN NUSA TENGGARA TIMUR 97 Phase 3 24 16 872 3.6 123.92301 -9.87148 19368 5311060023 OTOGEDU NUSA TENGGARA TIMUR 56 Phase 3 17 14 433 3.1 121.84264 -8.55999 19369 5305040006 NANSEAN NUSA TENGGARA TIMUR 26 Phase 3 11 7 733 1.7 124.65292 -9.52158 19370 5315020005 GOLO MBU NUSA TENGGARA TIMUR 73 Phase 3 20 16 980 3.7 120.02854 -8.64913 19371 5305040006 NANSEAN NUSA TENGGARA TIMUR 76 Phase 3 32 22 496 4.9 124.65107 -9.51817 19372 5311061008 NIOPANDA NUSA TENGGARA TIMUR 8 Phase 3 2 1 698 0.4 121.89719 -8.56024 19373 5304021001 LAOB NUSA TENGGARA TIMUR 83 Phase 3 23 16 169 3.5 124.36407 -9.70486 19374 5311061014 RANGALAKA NUSA TENGGARA TIMUR 36 Phase 3 8 6 792 1.5 121.89726 -8.56052 19375 5306011009 TAFULI NUSA TENGGARA TIMUR 80 Phase 3 24 16 872 3.6 124.69868 -9.58982 19376 5311061014 RANGALAKA NUSA TENGGARA TIMUR 70 Phase 3 16 13 584 2.9 121.89417 -8.56229 19377 5304012004 BONLEU NUSA TENGGARA TIMUR 28 Phase 3 8 5 624 1.2 124.30361 -9.60710 19378 5315020022 GOLO SEMBEA NUSA TENGGARA TIMUR 75 Phase 3 18 15 282 3.3 120.06850 -8.58723 19379 5304023004 NEKE MANI FETO NUSA TENGGARA TIMUR 61 Phase 3 17 11 951 2.6 124.18385 -9.76828 19380 5315020022 GOLO SEMBEA NUSA TENGGARA TIMUR 39 Phase 3 10 8 490 1.8 120.06689 -8.59124 19381 5304081001 SILLU NUSA TENGGARA TIMUR 56 Phase 3 16 11 248 2.4 124.55214 -9.76442 19382 5310011006 LIAKUTU NUSA TENGGARA TIMUR 59 Phase 3 15 12 735 2.7 122.05880 -8.62124 19383 5303170007 TANINI NUSA TENGGARA TIMUR 123 Phase 3 32 22 496 4.9 123.93495 -9.85658 19384 5311062005 KEBESANI NUSA TENGGARA TIMUR 62 Phase 3 15 12 735 2.7 121.80300 -8.67839 19385 5303180003 OHAEM I NUSA TENGGARA TIMUR 21 Phase 3 5 3 515 0.8 124.03244 -9.74758 19386 5311060018 KELIWUMBU NUSA TENGGARA TIMUR 126 Phase 3 28 23 772 5.1 121.74599 -8.49844 19387 5303180003 OHAEM I NUSA TENGGARA TIMUR 15 Phase 3 4 2 812 0.6 124.03181 -9.74468 19388 5311060018 KELIWUMBU NUSA TENGGARA TIMUR 43 Phase 3 10 8 490 1.8 121.74929 -8.49838 19389 5303180003 OHAEM I NUSA TENGGARA TIMUR 14 Phase 3 4 2 812 0.6 124.03121 -9.74402 19390 5311060018 KELIWUMBU NUSA TENGGARA TIMUR 24 Phase 3 6 5 094 1.1 121.75020 -8.49871 19391 5306032005 FATURIKA NUSA TENGGARA TIMUR 87 Phase 3 22 15 466 3.3 124.94153 -9.31950 19392 5315010008 MACANG TANGGAR NUSA TENGGARA TIMUR 62 Phase 3 14 11 886 2.6 119.88012 -8.56336 19393 5303141006 NUNMAFO NUSA TENGGARA TIMUR 48 Phase 3 16 11 248 2.4 124.08691 -10.09699 19394 5315010008 MACANG TANGGAR NUSA TENGGARA TIMUR 88 Phase 3 20 16 980 3.7 119.88598 -8.56667 19395 5305022006 MAURISU UTARA NUSA TENGGARA TIMUR 35 Phase 3 9 6 327 1.4 124.59618 -9.54174 19396 5319030016 SISIR NUSA TENGGARA TIMUR 98 Phase 3 24 20 376 4.4 120.72688 -8.48627 19397 5305052006 OEPUAH UTARA NUSA TENGGARA TIMUR 80 Phase 3 18 12 654 2.7 124.57437 -9.16441 19398 5311040009 NGALUROGA NUSA TENGGARA TIMUR 100 Phase 3 27 22 923 4.9 121.80552 -8.83717 19399 5303121003 BOKONG NUSA TENGGARA TIMUR 33 Phase 3 9 6 327 1.4 123.78457 -10.20430 19400 5315030001 NANGA BERE NUSA TENGGARA TIMUR 74 Phase 3 15 12 735 2.7 119.94197 -8.82099 19401 5303121003 BOKONG NUSA TENGGARA TIMUR 43 Phase 3 12 8 436 1.8 123.78582 -10.20615 19402 5311052006 DETUPERA NUSA TENGGARA TIMUR 34 Phase 3 11 9 339 2.0 121.96019 -8.76645 19403 5304080016 SINI NUSA TENGGARA TIMUR 23 Phase 3 8 5 624 1.2 124.52115 -9.74898 19404 5313041008 HILIHINTIR NUSA TENGGARA TIMUR 52 Phase 3 11 9 339 2.0 120.38444 -8.78935 19405 5304080016 SINI NUSA TENGGARA TIMUR 22 Phase 3 8 5 624 1.2 124.52060 -9.75401 19406 5310012014 RENGGARASI NUSA TENGGARA TIMUR 46 Phase 3 10 8 490 1.8 121.98369 -8.69943 19407 5304080016 SINI NUSA TENGGARA TIMUR 41 Phase 3 14 9 842 2.1 124.52088 -9.75531 19408 5310012011 BU UTARA NUSA TENGGARA TIMUR 43 Phase 3 11 9 339 2.0 121.95108 -8.72062 19409 5304072001 NEKE NUSA TENGGARA TIMUR 72 Phase 3 21 14 763 3.2 124.50866 -9.74535 19410 5315030004 REPI NUSA TENGGARA TIMUR 192 Phase 3 36 30 564 6.6 120.22992 -8.83387 19411 5304072001 NEKE NUSA TENGGARA TIMUR 65 Phase 3 19 13 357 2.9 124.50763 -9.74873 19412 5315050001 LOHA NUSA TENGGARA TIMUR 67 Phase 3 16 13 584 2.9 120.16874 -8.46599 19413 5305040007 SUSULAKU NUSA TENGGARA TIMUR 69 Phase 3 17 11 951 2.6 124.68231 -9.47948 19414 5310012011 BU UTARA NUSA TENGGARA TIMUR 44 Phase 3 11 9 339 2.0 121.94476 -8.72440 19415 5304023006 PIKA NUSA TENGGARA TIMUR 41 Phase 3 10 7 030 1.5 124.31475 -9.76284 19416 5310012012 BU WATUWETI NUSA TENGGARA TIMUR 39 Phase 3 12 10 188 2.2 121.93877 -8.72088 19417 5304072006 OENINO NUSA TENGGARA TIMUR 102 Phase 3 25 17 575 3.8 124.45132 -9.74149 19418 5311061006 TOU TIMUR NUSA TENGGARA TIMUR 73 Phase 3 18 15 282 3.3 121.97992 -8.57454 19419 5304072006 OENINO NUSA TENGGARA TIMUR 24 Phase 3 6 4 218 0.9 124.45325 -9.74862 19420 5319060016 SATAR PUNDA NUSA TENGGARA TIMUR 111 Phase 3 46 39 054 8.4 120.52930 -8.27395 19421 5304072006 OENINO NUSA TENGGARA TIMUR 33 Phase 3 9 6 327 1.4 124.45506 -9.75150 19422 5312080012 BENTENG TENGAH NUSA TENGGARA TIMUR 23 Phase 3 6 5 094 1.1 121.03926 -8.43044 19423 5304072002 PENE UTARA NUSA TENGGARA TIMUR 62 Phase 3 16 11 248 2.4 124.44514 -9.74723 19424 5315011001 POTA WANGKA NUSA TENGGARA TIMUR 142 Phase 3 32 27 168 5.9 119.96487 -8.51668 19425 5304072002 PENE UTARA NUSA TENGGARA TIMUR 22 Phase 3 6 4 218 0.9 124.43994 -9.74967 19426 5319060013 SATAR PADUT NUSA TENGGARA TIMUR 51 Phase 3 13 11 037 2.4 120.59584 -8.31268 19427 5304072002 PENE UTARA NUSA TENGGARA TIMUR 50 Phase 3 13 9 139 2.0 124.43399 -9.75073 19428 5311071011 NUANGENDA NUSA TENGGARA TIMUR 45 Phase 3 12 10 188 2.2 121.75351 -8.64619 19429 5304072002 PENE UTARA NUSA TENGGARA TIMUR 20 Phase 3 6 4 218 0.9 124.43044 -9.75025 19430 5319040007 LADA MESE NUSA TENGGARA TIMUR 55 Phase 3 14 11 886 2.6 120.67054 -8.47410 19431 5304072002 PENE UTARA NUSA TENGGARA TIMUR 23 Phase 3 6 4 218 0.9 124.42959 -9.74982 19432 5319040007 LADA MESE NUSA TENGGARA TIMUR 67 Phase 3 17 14 433 3.1 120.66368 -8.47895 19433 5304040011 PUSU NUSA TENGGARA TIMUR 27 Phase 3 7 4 921 1.1 124.31193 -9.91620 19434 5310010004 PAGA NUSA TENGGARA TIMUR 43 Phase 3 10 8 490 1.8 122.05093 -8.74502 Annex II – Demand forecast results Page 111 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 19435 5305040007 SUSULAKU NUSA TENGGARA TIMUR 153 Phase 3 38 26 714 5.8 124.68906 -9.50667 19436 5310010004 PAGA NUSA TENGGARA TIMUR 28 Phase 3 7 5 943 1.3 122.04967 -8.74390 19437 5303181003 LETKOLE NUSA TENGGARA TIMUR 123 Phase 3 29 20 387 4.4 123.80466 -9.69910 19438 5310010015 MASEBEWA NUSA TENGGARA TIMUR 34 Phase 3 10 8 490 1.8 122.01346 -8.73422 19439 5303181003 LETKOLE NUSA TENGGARA TIMUR 63 Phase 3 15 10 545 2.3 123.80464 -9.68692 19440 5310012014 RENGGARASI NUSA TENGGARA TIMUR 46 Phase 3 10 8 490 1.8 121.99150 -8.69974 19441 5303181003 LETKOLE NUSA TENGGARA TIMUR 351 Phase 3 82 57 646 12.4 123.80432 -9.68548 19442 5310010003 MBENGU NUSA TENGGARA TIMUR 1 Phase 3 1 849 0.2 122.02925 -8.77035 19443 5303181003 LETKOLE NUSA TENGGARA TIMUR 130 Phase 3 31 21 793 4.7 123.80648 -9.68642 19444 5313140018 TOE NUSA TENGGARA TIMUR 77 Phase 3 18 15 282 3.3 120.36361 -8.31668 19445 5303181003 LETKOLE NUSA TENGGARA TIMUR 44 Phase 3 11 7 733 1.7 123.80169 -9.68647 19446 5310012013 LOKE NUSA TENGGARA TIMUR 59 Phase 3 10 8 490 1.8 121.99423 -8.69031 19447 5304101012 MEUSIN NUSA TENGGARA TIMUR 54 Phase 3 10 7 030 1.5 124.77727 -9.80278 19448 5310012021 TUWA NUSA TENGGARA TIMUR 21 Phase 3 5 4 245 0.9 121.99437 -8.68990 19449 5304022004 SALBAIT NUSA TENGGARA TIMUR 126 Phase 3 36 25 308 5.5 124.13170 -9.85810 19450 5313140020 LEMARANG NUSA TENGGARA TIMUR 180 Phase 3 38 32 262 7.0 120.32349 -8.31404 19451 5304102004 NENOAT NUSA TENGGARA TIMUR 43 Phase 3 12 8 436 1.8 124.67255 -9.88379 19452 5312030016 MANGULEWA NUSA TENGGARA TIMUR 62 Phase 3 14 11 886 2.6 121.05021 -8.76216 19453 5305026002 BAKITOLAS NUSA TENGGARA TIMUR 15 Phase 3 4 2 812 0.6 124.49187 -9.30538 19454 5318010016 SELALEJO NUSA TENGGARA TIMUR 69 Phase 3 15 12 735 2.7 121.23913 -8.84016 19455 5305026002 BAKITOLAS NUSA TENGGARA TIMUR 44 Phase 3 12 8 436 1.8 124.49266 -9.30391 19456 5315050013 NANGA KANTOR NUSA TENGGARA TIMUR 117 Phase 3 26 22 074 4.8 120.14401 -8.42200 19457 5305051003 OEKOPA NUSA TENGGARA TIMUR 31 Phase 3 8 5 624 1.2 124.77618 -9.33268 19458 5311040006 NGALUPOLO NUSA TENGGARA TIMUR 62 Phase 3 16 13 584 2.9 121.72035 -8.85858 19459 5305051003 OEKOPA NUSA TENGGARA TIMUR 33 Phase 3 9 6 327 1.4 124.77483 -9.33284 19460 5315010001 KOMODO NUSA TENGGARA TIMUR 623 Phase 3 141 119 709 25.8 119.49157 -8.58944 19461 5305041006 HUMUSU A NUSA TENGGARA TIMUR 15 Phase 3 4 2 812 0.6 124.55839 -9.29020 19462 5315010001 KOMODO NUSA TENGGARA TIMUR 565 Phase 3 128 108 672 23.4 119.48844 -8.59182 19463 5305052005 OEPUAH NUSA TENGGARA TIMUR 42 Phase 3 11 7 733 1.7 124.59905 -9.15798 19464 5315010001 KOMODO NUSA TENGGARA TIMUR 212 Phase 3 48 40 752 8.8 119.48498 -8.59553 19465 5305052005 OEPUAH NUSA TENGGARA TIMUR 26 Phase 3 7 4 921 1.1 124.60302 -9.15663 19466 5315020022 GOLO SEMBEA NUSA TENGGARA TIMUR 165 Phase 3 39 33 111 7.1 120.09060 -8.55263 19467 5305052005 OEPUAH NUSA TENGGARA TIMUR 13 Phase 3 4 2 812 0.6 124.60525 -9.15786 19468 5310011006 LIAKUTU NUSA TENGGARA TIMUR 48 Phase 3 12 10 188 2.2 122.06784 -8.69374 19469 5305052005 OEPUAH NUSA TENGGARA TIMUR 18 Phase 3 5 3 515 0.8 124.60456 -9.15908 19470 5315050004 PACAR NUSA TENGGARA TIMUR 152 Phase 3 28 23 772 5.1 120.23335 -8.48550 19471 5305052005 OEPUAH NUSA TENGGARA TIMUR 61 Phase 3 15 10 545 2.3 124.61338 -9.15502 19472 5319030009 TENO MESE NUSA TENGGARA TIMUR 64 Phase 3 13 11 037 2.4 120.76891 -8.61679 19473 5305052005 OEPUAH NUSA TENGGARA TIMUR 60 Phase 3 15 10 545 2.3 124.61632 -9.15359 19474 5319030005 LANGGASAI NUSA TENGGARA TIMUR 109 Phase 3 38 32 262 7.0 120.87243 -8.62134 19475 5306013007 LEUNKLOT NUSA TENGGARA TIMUR 35 Phase 3 9 6 327 1.4 124.84024 -9.64718 19476 5319050017 COMPANG LAHO NUSA TENGGARA TIMUR 16 Phase 3 4 3 396 0.7 120.56363 -8.53572 19477 5306013007 LEUNKLOT NUSA TENGGARA TIMUR 25 Phase 3 7 4 921 1.1 124.84085 -9.64511 19478 5311061014 RANGALAKA NUSA TENGGARA TIMUR 54 Phase 3 12 10 188 2.2 121.91848 -8.57442 19479 5306013007 LEUNKLOT NUSA TENGGARA TIMUR 12 Phase 3 4 2 812 0.6 124.84119 -9.64519 19480 5319050007 POCOLIA NUSA TENGGARA TIMUR 33 Phase 3 9 7 641 1.6 120.58728 -8.58597 19481 5305023003 BUK NUSA TENGGARA TIMUR 52 Phase 3 14 9 842 2.1 124.39256 -9.39157 19482 5311062011 UNGGU NUSA TENGGARA TIMUR 35 Phase 3 8 6 792 1.5 121.87177 -8.60188 19483 5304023005 OELEKAM NUSA TENGGARA TIMUR 61 Phase 3 16 11 248 2.4 124.30997 -9.78722 19484 5315040002 RANGGU NUSA TENGGARA TIMUR 26 Phase 3 7 5 943 1.3 120.23874 -8.58654 19485 5305061002 MOTADIK NUSA TENGGARA TIMUR 60 Phase 3 15 10 545 2.3 124.79042 -9.07743 19486 5311071011 NUANGENDA NUSA TENGGARA TIMUR 24 Phase 3 7 5 943 1.3 121.71749 -8.62419 19487 5306012008 BADARAI NUSA TENGGARA TIMUR 23 Phase 3 6 4 218 0.9 124.86571 -9.70516 19488 5311071011 NUANGENDA NUSA TENGGARA TIMUR 4 Phase 3 2 1 698 0.4 121.71732 -8.62527 19489 5304080012 BILLA NUSA TENGGARA TIMUR 34 Phase 3 11 7 733 1.7 124.54854 -9.66202 19490 5312030020 SANGADETO NUSA TENGGARA TIMUR 18 Phase 3 4 3 396 0.7 121.08651 -8.74761 19491 5304051004 NAIP NUSA TENGGARA TIMUR 67 Phase 3 13 9 139 2.0 124.35573 -10.02722 19492 5311063004 KURU NUSA TENGGARA TIMUR 18 Phase 3 5 4 245 0.9 121.87948 -8.67601 19493 5303170001 TAKARI NUSA TENGGARA TIMUR 49 Phase 3 15 10 545 2.3 124.05638 -9.98204 19494 5305021001 KIUOLA NUSA TENGGARA TIMUR 25 Phase 3 7 4 921 1.1 124.45983 -9.59284 19495 5304050008 NOEMUKE NUSA TENGGARA TIMUR 31 Phase 3 8 5 624 1.2 124.36229 -10.05062 19496 5304082001 FATUKOPA NUSA TENGGARA TIMUR 4 Phase 3 2 1 406 0.3 124.62244 -9.69689 19497 5304082001 FATUKOPA NUSA TENGGARA TIMUR 8 Phase 3 3 2 109 0.5 124.62214 -9.69683 19498 5306012008 BADARAI NUSA TENGGARA TIMUR 9 Phase 3 3 2 109 0.5 124.86729 -9.70414 19499 5305020037 TUNTUN NUSA TENGGARA TIMUR 42 Phase 3 14 9 842 2.1 124.50173 -9.37188 19500 5303160013 OEBOLA DALAM NUSA TENGGARA TIMUR 151 Phase 3 28 19 684 4.2 123.95473 -10.05781 19501 5303141004 OEMOFA NUSA TENGGARA TIMUR 43 Phase 3 12 8 436 1.8 124.11435 -10.07400 19502 5306012008 BADARAI NUSA TENGGARA TIMUR 7 Phase 3 2 1 406 0.3 124.86828 -9.70374 19503 5306012006 WEOE NUSA TENGGARA TIMUR 12 Phase 3 4 2 812 0.6 124.83337 -9.67858 19504 5304023002 OELBUBUK NUSA TENGGARA TIMUR 45 Phase 3 11 7 733 1.7 124.25568 -9.76411 19505 5305052004 KAUBELE NUSA TENGGARA TIMUR 13 Phase 3 4 2 812 0.6 124.61678 -9.23907 19506 5305052003 MATABESI NUSA TENGGARA TIMUR 21 Phase 3 7 4 921 1.1 124.61716 -9.23937 19507 5305041008 HUMUSU B NUSA TENGGARA TIMUR 39 Phase 3 10 7 030 1.5 124.58583 -9.23851 19508 5305041008 HUMUSU B NUSA TENGGARA TIMUR 54 Phase 3 14 9 842 2.1 124.58597 -9.23690 19509 5305051001 T'EBA NUSA TENGGARA TIMUR 41 Phase 3 10 7 030 1.5 124.76998 -9.36408 19510 5305051001 T'EBA NUSA TENGGARA TIMUR 44 Phase 3 11 7 733 1.7 124.76835 -9.36775 19511 5305051001 T'EBA NUSA TENGGARA TIMUR 12 Phase 3 3 2 109 0.5 124.76949 -9.36292 19512 5305051001 T'EBA NUSA TENGGARA TIMUR 16 Phase 3 4 2 812 0.6 124.77065 -9.36193 19513 5306010009 RABASA NUSA TENGGARA TIMUR 18 Phase 3 6 4 218 0.9 124.87279 -9.70353 19514 5304061006 TUAPAKAS NUSA TENGGARA TIMUR 39 Phase 3 10 7 030 1.5 124.48238 -10.08726 19515 5304023002 OELBUBUK NUSA TENGGARA TIMUR 33 Phase 3 9 6 327 1.4 124.25314 -9.75772 19516 5305024006 INBATE NUSA TENGGARA TIMUR 30 Phase 3 8 5 624 1.2 124.37090 -9.43451 19517 5304023005 OELEKAM NUSA TENGGARA TIMUR 44 Phase 3 12 8 436 1.8 124.30460 -9.77999 19518 5304011009 KUANOEL NUSA TENGGARA TIMUR 4 Phase 3 2 1 406 0.3 124.24075 -9.65777 19519 5305061006 KOTAFOUN NUSA TENGGARA TIMUR 87 Phase 3 22 15 466 3.3 124.73397 -9.11534 Annex II – Demand forecast results Page 112 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 19520 5304040010 MNELALETE NUSA TENGGARA TIMUR 41 Phase 3 9 6 327 1.4 124.28806 -9.89883 19521 5304040010 MNELALETE NUSA TENGGARA TIMUR 24 Phase 3 5 3 515 0.8 124.29156 -9.89784 19522 5305042005 LETNEO NUSA TENGGARA TIMUR 84 Phase 3 20 14 060 3.0 124.62967 -9.53442 19523 5305022006 MAURISU UTARA NUSA TENGGARA TIMUR 10 Phase 3 3 2 109 0.5 124.62926 -9.53897 19524 5305022006 MAURISU UTARA NUSA TENGGARA TIMUR 43 Phase 3 11 7 733 1.7 124.62922 -9.54131 19525 5305022006 MAURISU UTARA NUSA TENGGARA TIMUR 19 Phase 3 5 3 515 0.8 124.62552 -9.53828 19526 5305022006 MAURISU UTARA NUSA TENGGARA TIMUR 6 Phase 3 2 1 406 0.3 124.62486 -9.53835 19527 5305022006 MAURISU UTARA NUSA TENGGARA TIMUR 30 Phase 3 8 5 624 1.2 124.62360 -9.53871 19528 5304023005 OELEKAM NUSA TENGGARA TIMUR 13 Phase 3 4 2 812 0.6 124.30189 -9.77850 19529 5305050001 PANTAE NUSA TENGGARA TIMUR 105 Phase 3 30 21 090 4.6 124.64634 -9.36180 19530 5305050001 PANTAE NUSA TENGGARA TIMUR 26 Phase 3 8 5 624 1.2 124.64486 -9.35886 19531 5305052005 OEPUAH NUSA TENGGARA TIMUR 30 Phase 3 8 5 624 1.2 124.62176 -9.14938 19532 5305052005 OEPUAH NUSA TENGGARA TIMUR 15 Phase 3 4 2 812 0.6 124.62460 -9.14709 19533 5305052005 OEPUAH NUSA TENGGARA TIMUR 6 Phase 3 2 1 406 0.3 124.62518 -9.14653 19534 5303192004 NETEMNANU UTARA NUSA TENGGARA TIMUR 5 Phase 3 2 1 406 0.3 124.08971 -9.42388 19535 5304023005 OELEKAM NUSA TENGGARA TIMUR 17 Phase 3 5 3 515 0.8 124.29786 -9.77750 19536 5304102005 NUNKOLO NUSA TENGGARA TIMUR 29 Phase 3 8 5 624 1.2 124.72232 -9.86752 19537 5304102005 NUNKOLO NUSA TENGGARA TIMUR 14 Phase 3 4 2 812 0.6 124.72250 -9.86700 19538 5306020004 KATERI NUSA TENGGARA TIMUR 22 Phase 3 7 4 921 1.1 124.86351 -9.52256 19539 5305052003 MATABESI NUSA TENGGARA TIMUR 30 Phase 3 10 7 030 1.5 124.68748 -9.19978 19540 5303170002 NOELMINA NUSA TENGGARA TIMUR 29 Phase 3 8 5 624 1.2 124.08188 -10.00447 19541 5305050013 TUNBAEN NUSA TENGGARA TIMUR 19 Phase 3 5 3 515 0.8 124.65605 -9.30844 19542 5304021010 BALU NUSA TENGGARA TIMUR 18 Phase 3 5 3 515 0.8 124.41002 -9.71513 19543 5304023006 PIKA NUSA TENGGARA TIMUR 33 Phase 3 8 5 624 1.2 124.33776 -9.78917 19544 5304023006 PIKA NUSA TENGGARA TIMUR 36 Phase 3 9 6 327 1.4 124.34390 -9.78695 19545 5304023006 PIKA NUSA TENGGARA TIMUR 26 Phase 3 7 4 921 1.1 124.31857 -9.76831 19546 5305061009 NIFUTASI NUSA TENGGARA TIMUR 25 Phase 3 8 5 624 1.2 124.67954 -9.20681 19547 5305061009 NIFUTASI NUSA TENGGARA TIMUR 29 Phase 3 9 6 327 1.4 124.68092 -9.21242 19548 5304080008 MNELAANEN NUSA TENGGARA TIMUR 34 Phase 3 9 6 327 1.4 124.60245 -9.70620 19549 5304011009 KUANOEL NUSA TENGGARA TIMUR 17 Phase 3 5 3 515 0.8 124.17417 -9.67661 19550 5304011009 KUANOEL NUSA TENGGARA TIMUR 15 Phase 3 4 2 812 0.6 124.17256 -9.67446 19551 5305050007 TAUTPAH NUSA TENGGARA TIMUR 24 Phase 3 7 4 921 1.1 124.74242 -9.33065 19552 5305050007 TAUTPAH NUSA TENGGARA TIMUR 32 Phase 3 9 6 327 1.4 124.74627 -9.32684 19553 5305025007 BANAIN NUSA TENGGARA TIMUR 9 Phase 3 3 2 109 0.5 124.42123 -9.36588 19554 5304111003 TOIANAS NUSA TENGGARA TIMUR 14 Phase 3 4 2 812 0.6 124.77950 -9.70743 19555 5305061009 NIFUTASI NUSA TENGGARA TIMUR 16 Phase 3 5 3 515 0.8 124.69794 -9.20082 19556 5305050007 TAUTPAH NUSA TENGGARA TIMUR 17 Phase 3 5 3 515 0.8 124.75153 -9.32645 19557 5305043004 TAINSALA NUSA TENGGARA TIMUR 22 Phase 3 6 4 218 0.9 124.63505 -9.32169 19558 5305043004 TAINSALA NUSA TENGGARA TIMUR 27 Phase 3 7 4 921 1.1 124.63569 -9.32273 19559 5305043004 TAINSALA NUSA TENGGARA TIMUR 23 Phase 3 6 4 218 0.9 124.63437 -9.32283 19560 5303170010 FATUKONA NUSA TENGGARA TIMUR 12 Phase 3 3 2 109 0.5 123.99980 -9.92540 19561 5304051002 TEAS NUSA TENGGARA TIMUR 15 Phase 3 4 2 812 0.6 124.29251 -9.93199 19562 5305061009 NIFUTASI NUSA TENGGARA TIMUR 17 Phase 3 5 3 515 0.8 124.73334 -9.24818 19563 5305061006 KOTAFOUN NUSA TENGGARA TIMUR 30 Phase 3 8 5 624 1.2 124.74271 -9.12538 19564 5305061006 KOTAFOUN NUSA TENGGARA TIMUR 28 Phase 3 7 4 921 1.1 124.74416 -9.13145 19565 5304021006 BIJELI NUSA TENGGARA TIMUR 17 Phase 3 5 3 515 0.8 124.33893 -9.65301 19566 5305023004 OELBONAK NUSA TENGGARA TIMUR 20 Phase 3 7 4 921 1.1 124.42171 -9.43586 19567 5304010008 EON BESI NUSA TENGGARA TIMUR 26 Phase 3 6 4 218 0.9 124.30007 -9.73648 19568 8105011004 SIYA MALUKU 409 Phase 3 84 86 184 16.3 134.32974 -6.81525 19569 8108020012 SOLATH MALUKU 526 Phase 2 131 134 406 25.4 127.38795 -7.51140 19570 5301022001 HOBA WAWI NUSA TENGGARA TIMUR 1 653 Pre-Electrified - - - 119.38292 -9.77543 19571 5301022004 WAI HURA NUSA TENGGARA TIMUR 1 741 Pre-Electrified - - - 119.44782 -9.73339 19572 5301022007 KATIKU LOKU NUSA TENGGARA TIMUR 1 671 Pre-Electrified - - - 119.45207 -9.69549 19573 5301022008 TARA MANU NUSA TENGGARA TIMUR 1 304 Pre-Electrified - - - 119.45335 -9.70983 19574 5301022009 PRAI BAKUL NUSA TENGGARA TIMUR 1 188 Pre-Electrified - - - 119.42704 -9.69260 19575 5301022010 MAMODU NUSA TENGGARA TIMUR 1 354 Pre-Electrified - - - 119.41072 -9.71753 19576 5301050001 DEDE KADU NUSA TENGGARA TIMUR 3 424 Pre-Electrified - - - 119.40677 -9.66256 19577 5301050003 SOBA WAWI NUSA TENGGARA TIMUR 808 Pre-Electrified - - - 119.39663 -9.62241 19578 5301050003 SOBA WAWI NUSA TENGGARA TIMUR 113 Pre-Electrified - - - 119.40057 -9.62014 19579 5301050003 SOBA WAWI NUSA TENGGARA TIMUR 793 Pre-Electrified - - - 119.39077 -9.62314 19580 5301050003 SOBA WAWI NUSA TENGGARA TIMUR - Pre-Electrified - - - 119.40918 -9.61905 19581 5301050003 SOBA WAWI NUSA TENGGARA TIMUR 241 Pre-Electrified - - - 119.39790 -9.62052 19582 5301050003 SOBA WAWI NUSA TENGGARA TIMUR 921 Pre-Electrified - - - 119.39343 -9.62297 19583 5301050003 SOBA WAWI NUSA TENGGARA TIMUR 649 Pre-Electrified - - - 119.40189 -9.61845 19584 5301050004 UBU PEDE NUSA TENGGARA TIMUR 775 Pre-Electrified - - - 119.42805 -9.60489 19585 5301050004 UBU PEDE NUSA TENGGARA TIMUR 1 217 Pre-Electrified - - - 119.42383 -9.60801 19586 5301050004 UBU PEDE NUSA TENGGARA TIMUR 414 Pre-Electrified - - - 119.41773 -9.61903 19587 5301050005 BERA DOLU NUSA TENGGARA TIMUR 1 256 Pre-Electrified - - - 119.47820 -9.62485 19588 5301050005 BERA DOLU NUSA TENGGARA TIMUR 1 118 Pre-Electrified - - - 119.46205 -9.62258 19589 5301050006 DOKA KAKA NUSA TENGGARA TIMUR 238 Pre-Electrified - - - 119.45513 -9.55156 19590 5301050006 DOKA KAKA NUSA TENGGARA TIMUR 770 Pre-Electrified - - - 119.44811 -9.56528 19591 5301050011 DIRA TANA NUSA TENGGARA TIMUR 236 Pre-Electrified - - - 119.37115 -9.61020 19592 5301050011 DIRA TANA NUSA TENGGARA TIMUR 419 Pre-Electrified - - - 119.37338 -9.61467 19593 5301050011 DIRA TANA NUSA TENGGARA TIMUR 2 131 Pre-Electrified - - - 119.38218 -9.62012 19594 5301050011 DIRA TANA NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 119.37502 -9.61478 19595 5301050011 DIRA TANA NUSA TENGGARA TIMUR 5 Pre-Electrified - - - 119.38797 -9.62404 19596 5301050013 TEMA TANA NUSA TENGGARA TIMUR 965 Pre-Electrified - - - 119.45536 -9.54817 19597 5301060002 WAILIANG NUSA TENGGARA TIMUR 4 514 Pre-Electrified - - - 119.40454 -9.63485 19598 5301060003 MALITI NUSA TENGGARA TIMUR 2 625 Pre-Electrified - - - 119.41022 -9.63750 19599 5301060004 KOMERDA NUSA TENGGARA TIMUR 2 787 Pre-Electrified - - - 119.41018 -9.61959 19600 5301060005 KAMPUNG BARU NUSA TENGGARA TIMUR 2 195 Pre-Electrified - - - 119.41670 -9.62474 19601 5301060005 KAMPUNG BARU NUSA TENGGARA TIMUR 268 Pre-Electrified - - - 119.41242 -9.62496 19602 5301060006 KAMPUNG SAWAH NUSA TENGGARA TIMUR 2 788 Pre-Electrified - - - 119.42021 -9.63377 19603 5301060007 KODAKA NUSA TENGGARA TIMUR 2 103 Pre-Electrified - - - 119.42766 -9.62847 19604 5301060008 LAPALE NUSA TENGGARA TIMUR 649 Pre-Electrified - - - 119.42083 -9.65921 Annex II – Demand forecast results Page 113 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 19605 5301060009 TEBARA NUSA TENGGARA TIMUR 2 992 Pre-Electrified - - - 119.43915 -9.63927 19606 5301060011 SOBA RADE NUSA TENGGARA TIMUR 1 086 Pre-Electrified - - - 119.46382 -9.61508 19607 5301060012 PADA EWETA NUSA TENGGARA TIMUR 514 Pre-Electrified - - - 119.40058 -9.62332 19608 5301060012 PADA EWETA NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 119.40109 -9.62139 19609 5301060012 PADA EWETA NUSA TENGGARA TIMUR 492 Pre-Electrified - - - 119.39656 -9.62308 19610 5301060012 PADA EWETA NUSA TENGGARA TIMUR 338 Pre-Electrified - - - 119.38508 -9.62326 19611 5301060012 PADA EWETA NUSA TENGGARA TIMUR 119 Pre-Electrified - - - 119.40312 -9.62469 19612 5301060012 PADA EWETA NUSA TENGGARA TIMUR 698 Pre-Electrified - - - 119.39066 -9.62420 19613 5301060012 PADA EWETA NUSA TENGGARA TIMUR 133 Pre-Electrified - - - 119.38778 -9.62461 19614 5301060012 PADA EWETA NUSA TENGGARA TIMUR 89 Pre-Electrified - - - 119.39407 -9.62327 19615 5301072001 LOKO RY NUSA TENGGARA TIMUR 188 Pre-Electrified - - - 119.40989 -9.43683 19616 5302010010 LEWAPAKU NUSA TENGGARA TIMUR 266 Pre-Electrified - - - 119.86811 -9.69617 19617 5302010010 LEWAPAKU NUSA TENGGARA TIMUR 2 037 Pre-Electrified - - - 119.88898 -9.70859 19618 5302010010 LEWAPAKU NUSA TENGGARA TIMUR 451 Pre-Electrified - - - 119.87834 -9.69950 19619 5302010010 LEWAPAKU NUSA TENGGARA TIMUR 134 Pre-Electrified - - - 119.87946 -9.69860 19620 5302010010 LEWAPAKU NUSA TENGGARA TIMUR 124 Pre-Electrified - - - 119.88106 -9.69871 19621 5302010010 LEWAPAKU NUSA TENGGARA TIMUR 162 Pre-Electrified - - - 119.88416 -9.70472 19622 5302010010 LEWAPAKU NUSA TENGGARA TIMUR 92 Pre-Electrified - - - 119.88665 -9.70991 19623 5302010010 LEWAPAKU NUSA TENGGARA TIMUR 1 389 Pre-Electrified - - - 119.88048 -9.70200 19624 5302010011 TANARARA NUSA TENGGARA TIMUR - Pre-Electrified - - - 119.87500 -9.72941 19625 5302010014 KAMBATA WUNDUT NUSA TENGGARA TIMUR 1 096 Pre-Electrified - - - 119.86411 -9.69222 19626 5302010017 KAMBU HAPANG NUSA TENGGARA TIMUR 1 412 Pre-Electrified - - - 119.91918 -9.70904 19627 5302011006 MAKAMENGGIT NUSA TENGGARA TIMUR 1 431 Pre-Electrified - - - 120.02981 -9.71377 19628 5302011009 KAHIRI NUSA TENGGARA TIMUR 1 079 Pre-Electrified - - - 119.95977 -9.73977 19629 5302011009 KAHIRI NUSA TENGGARA TIMUR 525 Pre-Electrified - - - 119.96207 -9.74140 19630 5302011011 TANATUKU NUSA TENGGARA TIMUR 979 Pre-Electrified - - - 120.00156 -9.73828 19631 5302012004 LAI HAWU NUSA TENGGARA TIMUR 272 Pre-Electrified - - - 119.83642 -9.75415 19632 5302013005 MATAWAI AMAHU NUSA TENGGARA TIMUR 368 MiniGrid Systems 73 51 319 11.1 119.89829 -9.79897 19633 5302020002 TAPIL NUSA TENGGARA TIMUR 290 MiniGrid Systems 64 44 992 9.7 120.01392 -9.95713 19634 5302020016 BANGGA WATU NUSA TENGGARA TIMUR 358 MiniGrid Systems 84 59 052 12.7 119.98523 -9.92017 19635 5302021001 WAHANG NUSA TENGGARA TIMUR 77 MiniGrid Systems 19 13 357 2.9 120.05504 -10.06660 19636 5302021001 WAHANG NUSA TENGGARA TIMUR 37 MiniGrid Systems 9 6 327 1.4 120.07552 -10.09094 19637 5302021001 WAHANG NUSA TENGGARA TIMUR 108 MiniGrid Systems 27 18 981 4.1 120.05053 -10.06914 19638 5302021002 TAWUI NUSA TENGGARA TIMUR 106 MiniGrid Systems 27 18 981 4.1 120.07015 -10.11733 19639 5302031001 PRAI SALURA NUSA TENGGARA TIMUR 501 MiniGrid Systems 121 85 063 18.4 120.17380 -10.31709 19640 5302031003 NGGONGI NUSA TENGGARA TIMUR 2 OffGrid Systems 1 703 0.2 120.23805 -10.24418 19641 5302031012 ANANJAKI NUSA TENGGARA TIMUR 75 MiniGrid Systems 17 11 951 2.6 120.23562 -10.24420 19642 5302031012 ANANJAKI NUSA TENGGARA TIMUR 38 MiniGrid Systems 9 6 327 1.4 120.23753 -10.24449 19643 5302032004 KATIKUTANA NUSA TENGGARA TIMUR 235 MiniGrid Systems 60 42 180 9.1 120.25385 -10.04518 19644 5302032005 PRAI BOKUL NUSA TENGGARA TIMUR 125 Pre-Electrified - - - 120.29581 -10.00768 19645 5302035002 KAKAHA NUSA TENGGARA TIMUR 177 Pre-Electrified - - - 120.35065 -10.20195 19646 5302035003 HAMBA WUTANG NUSA TENGGARA TIMUR 257 Pre-Electrified - - - 120.37967 -10.25107 19647 5302035003 HAMBA WUTANG NUSA TENGGARA TIMUR 92 Pre-Electrified - - - 120.38345 -10.23783 19648 5302035003 HAMBA WUTANG NUSA TENGGARA TIMUR 51 Pre-Electrified - - - 120.38250 -10.24187 19649 5302035003 HAMBA WUTANG NUSA TENGGARA TIMUR 114 Pre-Electrified - - - 120.38073 -10.23933 19650 5302040012 KALIUDA NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 120.70534 -10.14598 19651 5302040012 KALIUDA NUSA TENGGARA TIMUR 1 129 Pre-Electrified - - - 120.71410 -10.16493 19652 5302040012 KALIUDA NUSA TENGGARA TIMUR 912 Pre-Electrified - - - 120.70611 -10.15280 19653 5302040012 KALIUDA NUSA TENGGARA TIMUR 306 Pre-Electrified - - - 120.71581 -10.16223 19654 5302040012 KALIUDA NUSA TENGGARA TIMUR 128 Pre-Electrified - - - 120.71253 -10.16855 19655 5302040013 TANAMANANG NUSA TENGGARA TIMUR 269 Pre-Electrified - - - 120.70860 -10.14521 19656 5302040013 TANAMANANG NUSA TENGGARA TIMUR 242 Pre-Electrified - - - 120.70928 -10.14400 19657 5302040013 TANAMANANG NUSA TENGGARA TIMUR 201 Pre-Electrified - - - 120.71520 -10.13718 19658 5302040013 TANAMANANG NUSA TENGGARA TIMUR 172 Pre-Electrified - - - 120.71866 -10.13941 19659 5302040013 TANAMANANG NUSA TENGGARA TIMUR 502 Pre-Electrified - - - 120.71924 -10.14174 19660 5302040013 TANAMANANG NUSA TENGGARA TIMUR 230 Pre-Electrified - - - 120.71550 -10.14374 19661 5302040015 LAMBAKARA NUSA TENGGARA TIMUR 419 Pre-Electrified - - - 120.73872 -10.10486 19662 5302040015 LAMBAKARA NUSA TENGGARA TIMUR 677 Pre-Electrified - - - 120.73072 -10.11549 19663 5302040015 LAMBAKARA NUSA TENGGARA TIMUR 67 Pre-Electrified - - - 120.74979 -10.09127 19664 5302040015 LAMBAKARA NUSA TENGGARA TIMUR 295 Pre-Electrified - - - 120.74863 -10.09070 19665 5302040015 LAMBAKARA NUSA TENGGARA TIMUR 8 Pre-Electrified - - - 120.75005 -10.09125 19666 5302041006 PARANDA NUSA TENGGARA TIMUR 91 Pre-Electrified - - - 120.60846 -10.19783 19667 5302051003 HANGGARORU NUSA TENGGARA TIMUR 3 OffGrid Systems 1 703 0.2 120.64731 -10.00010 19668 5302051005 HEIKATAPU NUSA TENGGARA TIMUR 199 Pre-Electrified - - - 120.77289 -10.00410 19669 5302051005 HEIKATAPU NUSA TENGGARA TIMUR 180 Pre-Electrified - - - 120.76973 -10.00661 19670 5302051006 TANARAING NUSA TENGGARA TIMUR 69 MiniGrid Systems 17 11 951 2.6 120.76303 -9.93789 19671 5302051006 TANARAING NUSA TENGGARA TIMUR 46 Pre-Electrified - - - 120.75700 -9.98587 19672 5302051006 TANARAING NUSA TENGGARA TIMUR 56 Pre-Electrified - - - 120.76135 -9.98673 19673 5302051006 TANARAING NUSA TENGGARA TIMUR 75 Pre-Electrified - - - 120.76219 -9.98616 19674 5302051006 TANARAING NUSA TENGGARA TIMUR 105 Pre-Electrified - - - 120.75807 -9.98585 19675 5302051007 RINDI NUSA TENGGARA TIMUR 104 OffGrid Systems 2 1 406 0.3 120.67872 -9.92721 19676 5302051007 RINDI NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 120.69461 -9.94680 19677 5302051007 RINDI NUSA TENGGARA TIMUR 64 Pre-Electrified - - - 120.69506 -9.94750 19678 5302051007 RINDI NUSA TENGGARA TIMUR 201 Pre-Electrified - - - 120.70350 -9.95572 19679 5302051008 KAYURI NUSA TENGGARA TIMUR 724 Pre-Electrified - - - 120.68077 -9.92281 19680 5302051008 KAYURI NUSA TENGGARA TIMUR 624 Pre-Electrified - - - 120.68146 -9.91587 19681 5302052013 LUMBUKORE NUSA TENGGARA TIMUR 3 216 Pre-Electrified - - - 120.66512 -9.88394 19682 5302052013 LUMBUKORE NUSA TENGGARA TIMUR 120 Pre-Electrified - - - 120.65853 -9.87993 19683 5302052013 LUMBUKORE NUSA TENGGARA TIMUR 85 Pre-Electrified - - - 120.65711 -9.87863 19684 5302052014 WATU HADANG NUSA TENGGARA TIMUR 185 Pre-Electrified - - - 120.64748 -9.89051 19685 5302052014 WATU HADANG NUSA TENGGARA TIMUR 163 Pre-Electrified - - - 120.64413 -9.89058 19686 5302052015 MUTUNGGEDING NUSA TENGGARA TIMUR 677 Pre-Electrified - - - 120.65674 -9.88090 19687 5302052015 MUTUNGGEDING NUSA TENGGARA TIMUR 81 Pre-Electrified - - - 120.65628 -9.87870 19688 5302052015 MUTUNGGEDING NUSA TENGGARA TIMUR 480 Pre-Electrified - - - 120.65332 -9.88714 19689 5302052015 MUTUNGGEDING NUSA TENGGARA TIMUR 479 Pre-Electrified - - - 120.64433 -9.85951 Annex II – Demand forecast results Page 114 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 19690 5302052015 MUTUNGGEDING NUSA TENGGARA TIMUR 161 Pre-Electrified - - - 120.64314 -9.85835 19691 5302052015 MUTUNGGEDING NUSA TENGGARA TIMUR 339 Pre-Electrified - - - 120.65184 -9.87329 19692 5302052016 MATAWAI ATU NUSA TENGGARA TIMUR 3 Pre-Electrified - - - 120.64454 -9.85810 19693 5302052016 MATAWAI ATU NUSA TENGGARA TIMUR 121 Pre-Electrified - - - 120.63708 -9.84409 19694 5302052016 MATAWAI ATU NUSA TENGGARA TIMUR 552 Pre-Electrified - - - 120.65257 -9.87279 19695 5302052016 MATAWAI ATU NUSA TENGGARA TIMUR 446 Pre-Electrified - - - 120.65914 -9.87421 19696 5302052016 MATAWAI ATU NUSA TENGGARA TIMUR 314 Pre-Electrified - - - 120.65430 -9.86431 19697 5302052017 PATAWANG NUSA TENGGARA TIMUR 253 Pre-Electrified - - - 120.60542 -9.78319 19698 5302052017 PATAWANG NUSA TENGGARA TIMUR 436 Pre-Electrified - - - 120.62329 -9.79240 19699 5302052017 PATAWANG NUSA TENGGARA TIMUR 467 Pre-Electrified - - - 120.62173 -9.81058 19700 5302052017 PATAWANG NUSA TENGGARA TIMUR 90 Pre-Electrified - - - 120.61195 -9.78875 19701 5302052017 PATAWANG NUSA TENGGARA TIMUR 98 Pre-Electrified - - - 120.62233 -9.81294 19702 5302052017 PATAWANG NUSA TENGGARA TIMUR 266 Pre-Electrified - - - 120.61708 -9.78217 19703 5302052017 PATAWANG NUSA TENGGARA TIMUR 218 Pre-Electrified - - - 120.62635 -9.81737 19704 5302052018 WANGA NUSA TENGGARA TIMUR 563 Pre-Electrified - - - 120.58770 -9.76256 19705 5302052018 WANGA NUSA TENGGARA TIMUR 341 Pre-Electrified - - - 120.58687 -9.76992 19706 5302060005 KAMBATA TANA NUSA TENGGARA TIMUR 349 Pre-Electrified - - - 120.32166 -9.69878 19707 5302060005 KAMBATA TANA NUSA TENGGARA TIMUR 144 Pre-Electrified - - - 120.32433 -9.69138 19708 5302060009 KADUMBUL NUSA TENGGARA TIMUR 1 594 Pre-Electrified - - - 120.54103 -9.70049 19709 5302060010 PALAKAHEMBI NUSA TENGGARA TIMUR 896 Pre-Electrified - - - 120.49079 -9.67160 19710 5302060010 PALAKAHEMBI NUSA TENGGARA TIMUR 764 Pre-Electrified - - - 120.48453 -9.66590 19711 5302060010 PALAKAHEMBI NUSA TENGGARA TIMUR 427 Pre-Electrified - - - 120.46749 -9.65195 19712 5302060012 KAWANGU NUSA TENGGARA TIMUR 133 Pre-Electrified - - - 120.32399 -9.67722 19713 5302060012 KAWANGU NUSA TENGGARA TIMUR 329 Pre-Electrified - - - 120.32126 -9.67844 19714 5302060012 KAWANGU NUSA TENGGARA TIMUR 118 Pre-Electrified - - - 120.31960 -9.68455 19715 5302060012 KAWANGU NUSA TENGGARA TIMUR 176 Pre-Electrified - - - 120.33669 -9.67415 19716 5302060012 KAWANGU NUSA TENGGARA TIMUR 2 316 Pre-Electrified - - - 120.32986 -9.67972 19717 5302060012 KAWANGU NUSA TENGGARA TIMUR 252 Pre-Electrified - - - 120.32105 -9.68774 19718 5302060012 KAWANGU NUSA TENGGARA TIMUR 428 Pre-Electrified - - - 120.33089 -9.67456 19719 5302061002 LUKU WINGIR NUSA TENGGARA TIMUR 103 MiniGrid Systems 24 16 872 3.6 120.28162 -9.76793 19720 5302070008 KAMALAPUTI NUSA TENGGARA TIMUR 61 Pre-Electrified - - - 120.26308 -9.64290 19721 5302070008 KAMALAPUTI NUSA TENGGARA TIMUR 7 812 Pre-Electrified - - - 120.25839 -9.64265 19722 5302070008 KAMALAPUTI NUSA TENGGARA TIMUR 2 Pre-Electrified - - - 120.26879 -9.65527 19723 5302070008 KAMALAPUTI NUSA TENGGARA TIMUR 13 Pre-Electrified - - - 120.27062 -9.65385 19724 5302070009 MATAWAI NUSA TENGGARA TIMUR 4 924 Pre-Electrified - - - 120.26355 -9.65474 19725 5302070009 MATAWAI NUSA TENGGARA TIMUR 102 Pre-Electrified - - - 120.26369 -9.65975 19726 5302070009 MATAWAI NUSA TENGGARA TIMUR 24 Pre-Electrified - - - 120.26752 -9.65728 19727 5302070010 HAMBALA NUSA TENGGARA TIMUR 733 Pre-Electrified - - - 120.24734 -9.65015 19728 5302070010 HAMBALA NUSA TENGGARA TIMUR 159 Pre-Electrified - - - 120.24974 -9.65657 19729 5302070010 HAMBALA NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 120.24626 -9.65586 19730 5302070010 HAMBALA NUSA TENGGARA TIMUR 6 300 Pre-Electrified - - - 120.25807 -9.65395 19731 5302070010 HAMBALA NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 120.26318 -9.66025 19732 5302070010 HAMBALA NUSA TENGGARA TIMUR 324 Pre-Electrified - - - 120.25716 -9.66185 19733 5302070010 HAMBALA NUSA TENGGARA TIMUR 205 Pre-Electrified - - - 120.26143 -9.66092 19734 5302070010 HAMBALA NUSA TENGGARA TIMUR 17 Pre-Electrified - - - 120.25161 -9.65698 19735 5302070010 HAMBALA NUSA TENGGARA TIMUR 111 Pre-Electrified - - - 120.25018 -9.65546 19736 5302070011 KAMBAJAWA NUSA TENGGARA TIMUR 32 Pre-Electrified - - - 120.24587 -9.65208 19737 5302070011 KAMBAJAWA NUSA TENGGARA TIMUR 199 Pre-Electrified - - - 120.24191 -9.66030 19738 5302070011 KAMBAJAWA NUSA TENGGARA TIMUR 104 Pre-Electrified - - - 120.24966 -9.65790 19739 5302070011 KAMBAJAWA NUSA TENGGARA TIMUR 104 Pre-Electrified - - - 120.24310 -9.67017 19740 5302070011 KAMBAJAWA NUSA TENGGARA TIMUR 8 345 Pre-Electrified - - - 120.24558 -9.66294 19741 5302070011 KAMBAJAWA NUSA TENGGARA TIMUR 129 Pre-Electrified - - - 120.25101 -9.66494 19742 5302070011 KAMBAJAWA NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 120.25499 -9.66797 19743 5302070011 KAMBAJAWA NUSA TENGGARA TIMUR 409 Pre-Electrified - - - 120.25316 -9.65933 19744 5302070011 KAMBAJAWA NUSA TENGGARA TIMUR 98 Pre-Electrified - - - 120.25143 -9.65760 19745 5302070011 KAMBAJAWA NUSA TENGGARA TIMUR 159 Pre-Electrified - - - 120.25039 -9.65791 19746 5302070011 KAMBAJAWA NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 120.25043 -9.66744 19747 5302070014 LUKU KAMARU NUSA TENGGARA TIMUR 559 MiniGrid Systems 117 82 251 17.7 120.14364 -9.76642 19748 5302071001 KIRITANA NUSA TENGGARA TIMUR 797 Pre-Electrified - - - 120.24974 -9.74248 19749 5302071002 MALUMBI NUSA TENGGARA TIMUR 728 Pre-Electrified - - - 120.28397 -9.71765 19750 5302071002 MALUMBI NUSA TENGGARA TIMUR 934 Pre-Electrified - - - 120.28535 -9.71270 19751 5302071002 MALUMBI NUSA TENGGARA TIMUR 126 Pre-Electrified - - - 120.28213 -9.70995 19752 5302071002 MALUMBI NUSA TENGGARA TIMUR 117 Pre-Electrified - - - 120.28413 -9.71019 19753 5302071003 LAMBANAPU NUSA TENGGARA TIMUR 441 Pre-Electrified - - - 120.27492 -9.68764 19754 5302071003 LAMBANAPU NUSA TENGGARA TIMUR 158 Pre-Electrified - - - 120.27689 -9.70176 19755 5302071003 LAMBANAPU NUSA TENGGARA TIMUR 582 Pre-Electrified - - - 120.28082 -9.70241 19756 5302071003 LAMBANAPU NUSA TENGGARA TIMUR 223 Pre-Electrified - - - 120.27351 -9.69710 19757 5302071003 LAMBANAPU NUSA TENGGARA TIMUR 229 Pre-Electrified - - - 120.27928 -9.69541 19758 5302071003 LAMBANAPU NUSA TENGGARA TIMUR 257 Pre-Electrified - - - 120.28804 -9.70415 19759 5302071003 LAMBANAPU NUSA TENGGARA TIMUR 85 Pre-Electrified - - - 120.28202 -9.70920 19760 5302071003 LAMBANAPU NUSA TENGGARA TIMUR 283 Pre-Electrified - - - 120.28361 -9.70845 19761 5302071003 LAMBANAPU NUSA TENGGARA TIMUR 318 Pre-Electrified - - - 120.27652 -9.69407 19762 5302071004 MAULIRU NUSA TENGGARA TIMUR 267 Pre-Electrified - - - 120.31775 -9.68527 19763 5302071004 MAULIRU NUSA TENGGARA TIMUR 97 Pre-Electrified - - - 120.29490 -9.67641 19764 5302071004 MAULIRU NUSA TENGGARA TIMUR 380 Pre-Electrified - - - 120.28047 -9.67711 19765 5302071004 MAULIRU NUSA TENGGARA TIMUR 700 Pre-Electrified - - - 120.29841 -9.67980 19766 5302071004 MAULIRU NUSA TENGGARA TIMUR 1 114 Pre-Electrified - - - 120.29291 -9.67188 19767 5302071004 MAULIRU NUSA TENGGARA TIMUR 503 Pre-Electrified - - - 120.28470 -9.68830 19768 5302071005 MAU HAU NUSA TENGGARA TIMUR 743 Pre-Electrified - - - 120.29786 -9.66942 19769 5302071005 MAU HAU NUSA TENGGARA TIMUR 210 Pre-Electrified - - - 120.31952 -9.67927 19770 5302071005 MAU HAU NUSA TENGGARA TIMUR 290 Pre-Electrified - - - 120.29463 -9.66639 19771 5302071005 MAU HAU NUSA TENGGARA TIMUR 302 Pre-Electrified - - - 120.29381 -9.66407 19772 5302071005 MAU HAU NUSA TENGGARA TIMUR 263 Pre-Electrified - - - 120.30062 -9.67127 19773 5302071006 KAMBANIRU NUSA TENGGARA TIMUR 223 Pre-Electrified - - - 120.28786 -9.64822 19774 5302071006 KAMBANIRU NUSA TENGGARA TIMUR 111 OffGrid Systems 2 1 406 0.3 120.29769 -9.64845 Annex II – Demand forecast results Page 115 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 19775 5302071006 KAMBANIRU NUSA TENGGARA TIMUR 96 Pre-Electrified - - - 120.28914 -9.64703 19776 5302071006 KAMBANIRU NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 120.29727 -9.64991 19777 5302071006 KAMBANIRU NUSA TENGGARA TIMUR 1 607 Pre-Electrified - - - 120.29152 -9.66231 19778 5302071006 KAMBANIRU NUSA TENGGARA TIMUR 81 Pre-Electrified - - - 120.28095 -9.66036 19779 5302071006 KAMBANIRU NUSA TENGGARA TIMUR 1 806 Pre-Electrified - - - 120.28048 -9.65740 19780 5302071006 KAMBANIRU NUSA TENGGARA TIMUR 116 Pre-Electrified - - - 120.28319 -9.65101 19781 5302071006 KAMBANIRU NUSA TENGGARA TIMUR 269 Pre-Electrified - - - 120.27766 -9.66734 19782 5302071006 KAMBANIRU NUSA TENGGARA TIMUR 170 Pre-Electrified - - - 120.27784 -9.66594 19783 5302071006 KAMBANIRU NUSA TENGGARA TIMUR 471 Pre-Electrified - - - 120.29065 -9.65826 19784 5302071006 KAMBANIRU NUSA TENGGARA TIMUR 284 Pre-Electrified - - - 120.28814 -9.66026 19785 5302071006 KAMBANIRU NUSA TENGGARA TIMUR 134 Pre-Electrified - - - 120.29236 -9.65626 19786 5302071006 KAMBANIRU NUSA TENGGARA TIMUR 239 Pre-Electrified - - - 120.28281 -9.65526 19787 5302071006 KAMBANIRU NUSA TENGGARA TIMUR 834 Pre-Electrified - - - 120.28911 -9.65108 19788 5302071007 PRAILIU NUSA TENGGARA TIMUR 217 Pre-Electrified - - - 120.27599 -9.65158 19789 5302071007 PRAILIU NUSA TENGGARA TIMUR 131 Pre-Electrified - - - 120.27669 -9.64949 19790 5302071007 PRAILIU NUSA TENGGARA TIMUR 71 Pre-Electrified - - - 120.27105 -9.64733 19791 5302071007 PRAILIU NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 120.28227 -9.64955 19792 5302071007 PRAILIU NUSA TENGGARA TIMUR 236 Pre-Electrified - - - 120.27457 -9.65317 19793 5302071007 PRAILIU NUSA TENGGARA TIMUR 69 Pre-Electrified - - - 120.28199 -9.64875 19794 5302071007 PRAILIU NUSA TENGGARA TIMUR 364 Pre-Electrified - - - 120.27273 -9.65137 19795 5302071007 PRAILIU NUSA TENGGARA TIMUR 198 Pre-Electrified - - - 120.27975 -9.64844 19796 5302071007 PRAILIU NUSA TENGGARA TIMUR 6 158 Pre-Electrified - - - 120.27780 -9.65679 19797 5302071007 PRAILIU NUSA TENGGARA TIMUR 233 Pre-Electrified - - - 120.27949 -9.65954 19798 5302071007 PRAILIU NUSA TENGGARA TIMUR 29 Pre-Electrified - - - 120.27520 -9.66713 19799 5302071007 PRAILIU NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 120.27084 -9.65372 19800 5302071008 WANGGA NUSA TENGGARA TIMUR 153 Pre-Electrified - - - 120.25819 -9.66748 19801 5302071008 WANGGA NUSA TENGGARA TIMUR 465 Pre-Electrified - - - 120.26659 -9.66522 19802 5302071008 WANGGA NUSA TENGGARA TIMUR 192 Pre-Electrified - - - 120.25949 -9.66544 19803 5302071008 WANGGA NUSA TENGGARA TIMUR 144 Pre-Electrified - - - 120.26334 -9.66532 19804 5302071008 WANGGA NUSA TENGGARA TIMUR 112 Pre-Electrified - - - 120.26498 -9.66612 19805 5302071008 WANGGA NUSA TENGGARA TIMUR 221 Pre-Electrified - - - 120.25558 -9.66770 19806 5302071008 WANGGA NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 120.26856 -9.66670 19807 5302071008 WANGGA NUSA TENGGARA TIMUR 119 Pre-Electrified - - - 120.26483 -9.65969 19808 5302071008 WANGGA NUSA TENGGARA TIMUR 83 Pre-Electrified - - - 120.27104 -9.67695 19809 5302071008 WANGGA NUSA TENGGARA TIMUR 3 931 Pre-Electrified - - - 120.27085 -9.67121 19810 5302071008 WANGGA NUSA TENGGARA TIMUR 75 Pre-Electrified - - - 120.27519 -9.66739 19811 5302080007 RAMBANGARU NUSA TENGGARA TIMUR 354 Pre-Electrified - - - 120.05156 -9.44888 19812 5302080007 RAMBANGARU NUSA TENGGARA TIMUR 643 Pre-Electrified - - - 120.05285 -9.44977 19813 5302080007 RAMBANGARU NUSA TENGGARA TIMUR 437 Pre-Electrified - - - 120.05362 -9.45384 19814 5302080012 KADAHANG NUSA TENGGARA TIMUR 678 Pre-Electrified - - - 120.01818 -9.40343 19815 5302080013 KALAMBA NUSA TENGGARA TIMUR 204 MiniGrid Systems 38 26 714 5.8 120.05681 -9.56921 19816 5302081001 NDAPAYAMI NUSA TENGGARA TIMUR 592 MiniGrid Systems 93 65 379 14.1 120.13574 -9.60055 19817 5302081002 TEMU NUSA TENGGARA TIMUR 145 Pre-Electrified - - - 120.24554 -9.65147 19818 5302081004 HAMBA PRAING NUSA TENGGARA TIMUR 151 Pre-Electrified - - - 120.19139 -9.50381 19819 5302081004 HAMBA PRAING NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 120.19444 -9.50727 19820 5302081004 HAMBA PRAING NUSA TENGGARA TIMUR 250 Pre-Electrified - - - 120.19935 -9.51561 19821 5302081004 HAMBA PRAING NUSA TENGGARA TIMUR 190 Pre-Electrified - - - 120.20275 -9.52536 19822 5302081004 HAMBA PRAING NUSA TENGGARA TIMUR 99 Pre-Electrified - - - 120.22131 -9.52999 19823 5302081004 HAMBA PRAING NUSA TENGGARA TIMUR 6 Pre-Electrified - - - 120.18711 -9.50013 19824 5302081004 HAMBA PRAING NUSA TENGGARA TIMUR 156 Pre-Electrified - - - 120.18423 -9.49816 19825 5302081005 MONDU NUSA TENGGARA TIMUR 744 Pre-Electrified - - - 120.10143 -9.48874 19826 5302081005 MONDU NUSA TENGGARA TIMUR 298 Pre-Electrified - - - 120.11647 -9.48915 19827 5303100007 UITAO NUSA TENGGARA TIMUR 67 Pre-Electrified - - - 123.41953 -10.20372 19828 5303100008 HUILELOT NUSA TENGGARA TIMUR 277 Pre-Electrified - - - 123.44563 -10.19437 19829 5303100008 HUILELOT NUSA TENGGARA TIMUR 387 Pre-Electrified - - - 123.44360 -10.19038 19830 5303100008 HUILELOT NUSA TENGGARA TIMUR 123 Pre-Electrified - - - 123.44055 -10.19390 19831 5303100009 UIASA NUSA TENGGARA TIMUR 11 Pre-Electrified - - - 123.46605 -10.14983 19832 5303100009 UIASA NUSA TENGGARA TIMUR 179 Pre-Electrified - - - 123.46364 -10.14688 19833 5303100009 UIASA NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 123.45425 -10.16990 19834 5303100009 UIASA NUSA TENGGARA TIMUR 752 Pre-Electrified - - - 123.45605 -10.17640 19835 5303100009 UIASA NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 123.45153 -10.16157 19836 5303100009 UIASA NUSA TENGGARA TIMUR 49 MiniGrid Systems 13 9 139 2.0 123.44534 -10.13708 19837 5303100010 HANSISI NUSA TENGGARA TIMUR 47 Pre-Electrified - - - 123.47477 -10.16600 19838 5303100010 HANSISI NUSA TENGGARA TIMUR 266 Pre-Electrified - - - 123.46765 -10.16423 19839 5303110001 TABLOLONG NUSA TENGGARA TIMUR 1 081 Pre-Electrified - - - 123.48539 -10.31585 19840 5303110002 LIFULEO NUSA TENGGARA TIMUR 1 017 Pre-Electrified - - - 123.50726 -10.32389 19841 5303110003 TESABELA NUSA TENGGARA TIMUR 266 Pre-Electrified - - - 123.51534 -10.30760 19842 5303110003 TESABELA NUSA TENGGARA TIMUR 141 Pre-Electrified - - - 123.50871 -10.30966 19843 5303110003 TESABELA NUSA TENGGARA TIMUR 487 Pre-Electrified - - - 123.50120 -10.29656 19844 5303110004 SUMLILI NUSA TENGGARA TIMUR 1 232 Pre-Electrified - - - 123.54968 -10.28852 19845 5303110004 SUMLILI NUSA TENGGARA TIMUR 119 Pre-Electrified - - - 123.54780 -10.32683 19846 5303110004 SUMLILI NUSA TENGGARA TIMUR 168 Pre-Electrified - - - 123.54763 -10.30017 19847 5303110004 SUMLILI NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 123.54979 -10.28406 19848 5303110005 OEMAT NUNU NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 123.55162 -10.27186 19849 5303110005 OEMAT NUNU NUSA TENGGARA TIMUR 138 Pre-Electrified - - - 123.55179 -10.26641 19850 5303110005 OEMAT NUNU NUSA TENGGARA TIMUR 349 Pre-Electrified - - - 123.54881 -10.28360 19851 5303110005 OEMAT NUNU NUSA TENGGARA TIMUR 143 Pre-Electrified - - - 123.54188 -10.27327 19852 5303110005 OEMAT NUNU NUSA TENGGARA TIMUR 289 Pre-Electrified - - - 123.54045 -10.26995 19853 5303110005 OEMAT NUNU NUSA TENGGARA TIMUR 205 Pre-Electrified - - - 123.53868 -10.29315 19854 5303110005 OEMAT NUNU NUSA TENGGARA TIMUR 492 Pre-Electrified - - - 123.52434 -10.27517 19855 5303110006 KUANHEUM NUSA TENGGARA TIMUR 721 Pre-Electrified - - - 123.50989 -10.24034 19856 5303110006 KUANHEUM NUSA TENGGARA TIMUR 203 Pre-Electrified - - - 123.51016 -10.23836 19857 5303110006 KUANHEUM NUSA TENGGARA TIMUR 114 Pre-Electrified - - - 123.51184 -10.24446 19858 5303110006 KUANHEUM NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 123.51533 -10.23654 19859 5303110006 KUANHEUM NUSA TENGGARA TIMUR 148 Pre-Electrified - - - 123.51825 -10.23339 Annex II – Demand forecast results Page 116 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 19860 5303110007 BOLOK NUSA TENGGARA TIMUR 1 015 Pre-Electrified - - - 123.51058 -10.22777 19861 5303110007 BOLOK NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 123.51484 -10.22425 19862 5303110007 BOLOK NUSA TENGGARA TIMUR 846 Pre-Electrified - - - 123.52086 -10.22278 19863 5303110007 BOLOK NUSA TENGGARA TIMUR 55 Pre-Electrified - - - 123.51903 -10.22155 19864 5303110007 BOLOK NUSA TENGGARA TIMUR 285 Pre-Electrified - - - 123.52170 -10.22861 19865 5303110008 NITNEO NUSA TENGGARA TIMUR 74 Pre-Electrified - - - 123.52233 -10.22217 19866 5303110008 NITNEO NUSA TENGGARA TIMUR 172 Pre-Electrified - - - 123.52200 -10.22652 19867 5303110008 NITNEO NUSA TENGGARA TIMUR 335 Pre-Electrified - - - 123.52420 -10.22936 19868 5303110008 NITNEO NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 123.52496 -10.21794 19869 5303110008 NITNEO NUSA TENGGARA TIMUR 32 Pre-Electrified - - - 123.52920 -10.21250 19870 5303110008 NITNEO NUSA TENGGARA TIMUR 413 Pre-Electrified - - - 123.53611 -10.21700 19871 5303110009 BATAKTE NUSA TENGGARA TIMUR 813 Pre-Electrified - - - 123.55658 -10.25446 19872 5303110009 BATAKTE NUSA TENGGARA TIMUR 237 Pre-Electrified - - - 123.55560 -10.25796 19873 5303110009 BATAKTE NUSA TENGGARA TIMUR 191 Pre-Electrified - - - 123.55205 -10.27179 19874 5303110009 BATAKTE NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 123.55206 -10.26631 19875 5303110010 MANULAI I NUSA TENGGARA TIMUR 324 Pre-Electrified - - - 123.56375 -10.23694 19876 5303110010 MANULAI I NUSA TENGGARA TIMUR 418 Pre-Electrified - - - 123.56615 -10.23232 19877 5303110010 MANULAI I NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 123.57040 -10.22595 19878 5303110010 MANULAI I NUSA TENGGARA TIMUR 260 Pre-Electrified - - - 123.57250 -10.22110 19879 5303110010 MANULAI I NUSA TENGGARA TIMUR 12 Pre-Electrified - - - 123.57378 -10.21711 19880 5303110010 MANULAI I NUSA TENGGARA TIMUR 103 Pre-Electrified - - - 123.57337 -10.21851 19881 5303110011 OENESU NUSA TENGGARA TIMUR 259 Pre-Electrified - - - 123.57066 -10.26495 19882 5303110011 OENESU NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 123.56859 -10.25655 19883 5303110011 OENESU NUSA TENGGARA TIMUR 243 Pre-Electrified - - - 123.56877 -10.26273 19884 5303110012 OENAEK NUSA TENGGARA TIMUR 36 Pre-Electrified - - - 123.53034 -10.29256 19885 5303110012 OENAEK NUSA TENGGARA TIMUR 22 Pre-Electrified - - - 123.52281 -10.29080 19886 5303110012 OENAEK NUSA TENGGARA TIMUR 55 Pre-Electrified - - - 123.52167 -10.27841 19887 5303110012 OENAEK NUSA TENGGARA TIMUR 150 Pre-Electrified - - - 123.51972 -10.27865 19888 5303110012 OENAEK NUSA TENGGARA TIMUR 355 Pre-Electrified - - - 123.52021 -10.28896 19889 5303111001 BONE NUSA TENGGARA TIMUR 425 Pre-Electrified - - - 123.60430 -10.32913 19890 5303111001 BONE NUSA TENGGARA TIMUR 282 Pre-Electrified - - - 123.59043 -10.32663 19891 5303111001 BONE NUSA TENGGARA TIMUR 396 Pre-Electrified - - - 123.59050 -10.32852 19892 5303111002 TALOETAN NUSA TENGGARA TIMUR 44 Pre-Electrified - - - 123.60951 -10.31760 19893 5303111002 TALOETAN NUSA TENGGARA TIMUR 163 Pre-Electrified - - - 123.60691 -10.31717 19894 5303111002 TALOETAN NUSA TENGGARA TIMUR 243 Pre-Electrified - - - 123.60532 -10.32526 19895 5303111002 TALOETAN NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 123.60385 -10.32848 19896 5303111002 TALOETAN NUSA TENGGARA TIMUR 209 Pre-Electrified - - - 123.60526 -10.31966 19897 5303111002 TALOETAN NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 123.60253 -10.31438 19898 5303111003 USAPISONBAI NUSA TENGGARA TIMUR 351 Pre-Electrified - - - 123.62311 -10.31161 19899 5303111003 USAPISONBAI NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 123.62035 -10.31513 19900 5303111003 USAPISONBAI NUSA TENGGARA TIMUR 46 Pre-Electrified - - - 123.61917 -10.31791 19901 5303111003 USAPISONBAI NUSA TENGGARA TIMUR 244 Pre-Electrified - - - 123.61802 -10.32298 19902 5303111003 USAPISONBAI NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 123.62522 -10.30923 19903 5303111004 OEPAHA NUSA TENGGARA TIMUR 503 Pre-Electrified - - - 123.66260 -10.34782 19904 5303111005 TASIKONA NUSA TENGGARA TIMUR 447 Pre-Electrified - - - 123.62375 -10.35302 19905 5303111006 OENIF NUSA TENGGARA TIMUR 638 Pre-Electrified - - - 123.63458 -10.29895 19906 5303111007 OEMASI NUSA TENGGARA TIMUR 903 Pre-Electrified - - - 123.66361 -10.27262 19907 5303111008 OELOMIN NUSA TENGGARA TIMUR 468 Pre-Electrified - - - 123.64304 -10.22773 19908 5303111008 OELOMIN NUSA TENGGARA TIMUR 193 Pre-Electrified - - - 123.64049 -10.23637 19909 5303111008 OELOMIN NUSA TENGGARA TIMUR 107 Pre-Electrified - - - 123.63526 -10.23274 19910 5303111008 OELOMIN NUSA TENGGARA TIMUR 145 Pre-Electrified - - - 123.63439 -10.23070 19911 5303111008 OELOMIN NUSA TENGGARA TIMUR 146 Pre-Electrified - - - 123.63463 -10.23523 19912 5303111008 OELOMIN NUSA TENGGARA TIMUR 249 Pre-Electrified - - - 123.63014 -10.23824 19913 5303111009 TUNFEU NUSA TENGGARA TIMUR 13 Pre-Electrified - - - 123.65955 -10.25010 19914 5303111009 TUNFEU NUSA TENGGARA TIMUR 36 Pre-Electrified - - - 123.65937 -10.24367 19915 5303111009 TUNFEU NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 123.65645 -10.24375 19916 5303111009 TUNFEU NUSA TENGGARA TIMUR 618 Pre-Electrified - - - 123.65693 -10.24831 19917 5303111009 TUNFEU NUSA TENGGARA TIMUR 150 Pre-Electrified - - - 123.64999 -10.24462 19918 5303111009 TUNFEU NUSA TENGGARA TIMUR 86 Pre-Electrified - - - 123.64819 -10.24487 19919 5303111009 TUNFEU NUSA TENGGARA TIMUR 162 Pre-Electrified - - - 123.64714 -10.24352 19920 5303111009 TUNFEU NUSA TENGGARA TIMUR 46 Pre-Electrified - - - 123.64425 -10.24104 19921 5303111010 OBEN NUSA TENGGARA TIMUR 959 Pre-Electrified - - - 123.67409 -10.27026 19922 5303111010 OBEN NUSA TENGGARA TIMUR 311 Pre-Electrified - - - 123.66999 -10.26943 19923 5303111011 BESMARAK NUSA TENGGARA TIMUR 133 Pre-Electrified - - - 123.67529 -10.24356 19924 5303111011 BESMARAK NUSA TENGGARA TIMUR 494 Pre-Electrified - - - 123.67281 -10.24619 19925 5303111011 BESMARAK NUSA TENGGARA TIMUR 134 Pre-Electrified - - - 123.66322 -10.24634 19926 5303120008 OELNASI NUSA TENGGARA TIMUR 55 Pre-Electrified - - - 123.74200 -10.17219 19927 5303120008 OELNASI NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 123.73949 -10.17838 19928 5303120008 OELNASI NUSA TENGGARA TIMUR 75 Pre-Electrified - - - 123.73789 -10.17905 19929 5303120008 OELNASI NUSA TENGGARA TIMUR 92 Pre-Electrified - - - 123.73455 -10.15628 19930 5303120008 OELNASI NUSA TENGGARA TIMUR 482 Pre-Electrified - - - 123.73488 -10.15406 19931 5303120008 OELNASI NUSA TENGGARA TIMUR 119 Pre-Electrified - - - 123.72936 -10.17250 19932 5303120008 OELNASI NUSA TENGGARA TIMUR 101 Pre-Electrified - - - 123.72867 -10.14853 19933 5303120008 OELNASI NUSA TENGGARA TIMUR 273 Pre-Electrified - - - 123.72878 -10.17487 19934 5303120008 OELNASI NUSA TENGGARA TIMUR 325 Pre-Electrified - - - 123.71534 -10.15211 19935 5303120008 OELNASI NUSA TENGGARA TIMUR 353 Pre-Electrified - - - 123.75578 -10.17017 19936 5303120009 OELPUAH NUSA TENGGARA TIMUR 46 Pre-Electrified - - - 123.74886 -10.13505 19937 5303120009 OELPUAH NUSA TENGGARA TIMUR 106 Pre-Electrified - - - 123.74870 -10.15235 19938 5303120009 OELPUAH NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 123.74687 -10.14796 19939 5303120009 OELPUAH NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 123.74198 -10.14083 19940 5303120009 OELPUAH NUSA TENGGARA TIMUR 128 Pre-Electrified - - - 123.71902 -10.16117 19941 5303120009 OELPUAH NUSA TENGGARA TIMUR 93 Pre-Electrified - - - 123.76541 -10.16352 19942 5303120009 OELPUAH NUSA TENGGARA TIMUR 79 Pre-Electrified - - - 123.76317 -10.18004 19943 5303120009 OELPUAH NUSA TENGGARA TIMUR 131 Pre-Electrified - - - 123.75966 -10.16761 19944 5303120009 OELPUAH NUSA TENGGARA TIMUR 86 Pre-Electrified - - - 123.75714 -10.16484 Annex II – Demand forecast results Page 117 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 19945 5303120009 OELPUAH NUSA TENGGARA TIMUR 36 Pre-Electrified - - - 123.75464 -10.13725 19946 5303120009 OELPUAH NUSA TENGGARA TIMUR 24 Pre-Electrified - - - 123.75346 -10.16280 19947 5303120009 OELPUAH NUSA TENGGARA TIMUR 386 Pre-Electrified - - - 123.75522 -10.13533 19948 5303120010 OEBELO NUSA TENGGARA TIMUR 1 515 Pre-Electrified - - - 123.76466 -10.10876 19949 5303120010 OEBELO NUSA TENGGARA TIMUR 439 Pre-Electrified - - - 123.75978 -10.11579 19950 5303120010 OEBELO NUSA TENGGARA TIMUR 2 328 Pre-Electrified - - - 123.75414 -10.10980 19951 5303120011 NOELBAKI NUSA TENGGARA TIMUR 562 Pre-Electrified - - - 123.71493 -10.13546 19952 5303120011 NOELBAKI NUSA TENGGARA TIMUR 522 Pre-Electrified - - - 123.71288 -10.14760 19953 5303120011 NOELBAKI NUSA TENGGARA TIMUR 1 500 Pre-Electrified - - - 123.70969 -10.12784 19954 5303120011 NOELBAKI NUSA TENGGARA TIMUR 5 337 Pre-Electrified - - - 123.70710 -10.13384 19955 5303120012 TARUS NUSA TENGGARA TIMUR 106 Pre-Electrified - - - 123.69699 -10.14378 19956 5303120012 TARUS NUSA TENGGARA TIMUR 350 Pre-Electrified - - - 123.69536 -10.14592 19957 5303120012 TARUS NUSA TENGGARA TIMUR 86 Pre-Electrified - - - 123.68723 -10.13906 19958 5303120012 TARUS NUSA TENGGARA TIMUR 128 Pre-Electrified - - - 123.68604 -10.15004 19959 5303120012 TARUS NUSA TENGGARA TIMUR 122 Pre-Electrified - - - 123.68369 -10.14150 19960 5303120012 TARUS NUSA TENGGARA TIMUR 2 265 Pre-Electrified - - - 123.68314 -10.13783 19961 5303120012 TARUS NUSA TENGGARA TIMUR 801 Pre-Electrified - - - 123.68059 -10.13197 19962 5303120012 TARUS NUSA TENGGARA TIMUR 61 Pre-Electrified - - - 123.67785 -10.13533 19963 5303120013 PENFUI TIMUR NUSA TENGGARA TIMUR 144 Pre-Electrified - - - 123.69774 -10.16795 19964 5303120013 PENFUI TIMUR NUSA TENGGARA TIMUR 177 Pre-Electrified - - - 123.69771 -10.17353 19965 5303120013 PENFUI TIMUR NUSA TENGGARA TIMUR 343 Pre-Electrified - - - 123.69704 -10.16121 19966 5303120013 PENFUI TIMUR NUSA TENGGARA TIMUR 232 Pre-Electrified - - - 123.68443 -10.17205 19967 5303120013 PENFUI TIMUR NUSA TENGGARA TIMUR 1 279 Pre-Electrified - - - 123.68461 -10.15773 19968 5303120013 PENFUI TIMUR NUSA TENGGARA TIMUR 4 046 Pre-Electrified - - - 123.66704 -10.16263 19969 5303120014 TANAH MERAH NUSA TENGGARA TIMUR 2 858 Pre-Electrified - - - 123.73325 -10.11246 19970 5303120015 MATA AIR NUSA TENGGARA TIMUR 434 Pre-Electrified - - - 123.69869 -10.14300 19971 5303120015 MATA AIR NUSA TENGGARA TIMUR 85 Pre-Electrified - - - 123.69191 -10.14026 19972 5303120015 MATA AIR NUSA TENGGARA TIMUR 4 358 Pre-Electrified - - - 123.68858 -10.13758 19973 5303121001 OELETSALA NUSA TENGGARA TIMUR 419 Pre-Electrified - - - 123.70725 -10.23694 19974 5303121001 OELETSALA NUSA TENGGARA TIMUR 83 Pre-Electrified - - - 123.70800 -10.23348 19975 5303121001 OELETSALA NUSA TENGGARA TIMUR 362 Pre-Electrified - - - 123.69598 -10.24230 19976 5303121001 OELETSALA NUSA TENGGARA TIMUR 224 Pre-Electrified - - - 123.69039 -10.24182 19977 5303121001 OELETSALA NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 123.68584 -10.24091 19978 5303121002 KUAKLALO NUSA TENGGARA TIMUR 398 Pre-Electrified - - - 123.70912 -10.23200 19979 5303121002 KUAKLALO NUSA TENGGARA TIMUR 73 Pre-Electrified - - - 123.70964 -10.22365 19980 5303121003 BOKONG NUSA TENGGARA TIMUR 55 MiniGrid Systems 15 10 545 2.3 123.80327 -10.18304 19981 5303121003 BOKONG NUSA TENGGARA TIMUR 92 MiniGrid Systems 25 17 575 3.8 123.80347 -10.18081 19982 5303121003 BOKONG NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 123.78374 -10.20110 19983 5303121003 BOKONG NUSA TENGGARA TIMUR 92 Pre-Electrified - - - 123.78249 -10.22901 19984 5303121003 BOKONG NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 123.78175 -10.19771 19985 5303121003 BOKONG NUSA TENGGARA TIMUR 111 Pre-Electrified - - - 123.78126 -10.20012 19986 5303121003 BOKONG NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 123.78027 -10.22315 19987 5303121003 BOKONG NUSA TENGGARA TIMUR 115 Pre-Electrified - - - 123.77925 -10.22115 19988 5303121003 BOKONG NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 123.77703 -10.21792 19989 5303121003 BOKONG NUSA TENGGARA TIMUR 746 Pre-Electrified - - - 123.77329 -10.20992 19990 5303121004 BAUMATA TIMUR NUSA TENGGARA TIMUR 24 Pre-Electrified - - - 123.70975 -10.21993 19991 5303121004 BAUMATA TIMUR NUSA TENGGARA TIMUR 450 Pre-Electrified - - - 123.70782 -10.21336 19992 5303121004 BAUMATA TIMUR NUSA TENGGARA TIMUR 44 Pre-Electrified - - - 123.70321 -10.20824 19993 5303121004 BAUMATA TIMUR NUSA TENGGARA TIMUR 286 Pre-Electrified - - - 123.70268 -10.20402 19994 5303121004 BAUMATA TIMUR NUSA TENGGARA TIMUR 102 Pre-Electrified - - - 123.70103 -10.20512 19995 5303121004 BAUMATA TIMUR NUSA TENGGARA TIMUR 20 Pre-Electrified - - - 123.69765 -10.19906 19996 5303121004 BAUMATA TIMUR NUSA TENGGARA TIMUR 91 Pre-Electrified - - - 123.69794 -10.20214 19997 5303121004 BAUMATA TIMUR NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 123.69343 -10.19177 19998 5303121004 BAUMATA TIMUR NUSA TENGGARA TIMUR 834 Pre-Electrified - - - 123.69605 -10.19684 19999 5303121004 BAUMATA TIMUR NUSA TENGGARA TIMUR - Pre-Electrified - - - 123.69204 -10.19918 20000 5303121005 OELTUA NUSA TENGGARA TIMUR 97 Pre-Electrified - - - 123.67980 -10.21611 20001 5303121005 OELTUA NUSA TENGGARA TIMUR 1 879 Pre-Electrified - - - 123.67665 -10.21467 20002 5303121005 OELTUA NUSA TENGGARA TIMUR 284 Pre-Electrified - - - 123.67509 -10.21006 20003 5303121005 OELTUA NUSA TENGGARA TIMUR 336 Pre-Electrified - - - 123.67394 -10.20812 20004 5303121005 OELTUA NUSA TENGGARA TIMUR 139 Pre-Electrified - - - 123.67210 -10.21272 20005 5303121005 OELTUA NUSA TENGGARA TIMUR 5 Pre-Electrified - - - 123.65824 -10.20753 20006 5303121005 OELTUA NUSA TENGGARA TIMUR 298 Pre-Electrified - - - 123.65745 -10.19483 20007 5303121005 OELTUA NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 123.65632 -10.19842 20008 5303121006 BAUMATA NUSA TENGGARA TIMUR 527 Pre-Electrified - - - 123.68875 -10.19864 20009 5303121006 BAUMATA NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 123.68004 -10.19702 20010 5303121006 BAUMATA NUSA TENGGARA TIMUR 867 Pre-Electrified - - - 123.67674 -10.19387 20011 5303121006 BAUMATA NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 123.66526 -10.20301 20012 5303121006 BAUMATA NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 123.66333 -10.20213 20013 5303121006 BAUMATA NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 123.66327 -10.20021 20014 5303121006 BAUMATA NUSA TENGGARA TIMUR 64 Pre-Electrified - - - 123.66179 -10.20126 20015 5303121006 BAUMATA NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 123.65865 -10.20702 20016 5303121006 BAUMATA NUSA TENGGARA TIMUR 99 Pre-Electrified - - - 123.65805 -10.20442 20017 5303121007 BAUMATA BARAT NUSA TENGGARA TIMUR 1 565 Pre-Electrified - - - 123.67384 -10.18299 20018 5303121007 BAUMATA BARAT NUSA TENGGARA TIMUR 1 173 Pre-Electrified - - - 123.67174 -10.18831 20019 5303121008 BAUMATA UTARA NUSA TENGGARA TIMUR - Pre-Electrified - - - 123.73111 -10.20607 20020 5303121008 BAUMATA UTARA NUSA TENGGARA TIMUR 241 Pre-Electrified - - - 123.70089 -10.18486 20021 5303121008 BAUMATA UTARA NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 123.69502 -10.18296 20022 5303121008 BAUMATA UTARA NUSA TENGGARA TIMUR 498 Pre-Electrified - - - 123.69073 -10.18554 20023 5303130012 OESENA NUSA TENGGARA TIMUR 23 Pre-Electrified - - - 123.82115 -10.21704 20024 5303130012 OESENA NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 123.81864 -10.21783 20025 5303130012 OESENA NUSA TENGGARA TIMUR 83 Pre-Electrified - - - 123.81373 -10.22019 20026 5303130012 OESENA NUSA TENGGARA TIMUR 646 Pre-Electrified - - - 123.81349 -10.22708 20027 5303130012 OESENA NUSA TENGGARA TIMUR 509 Pre-Electrified - - - 123.81341 -10.21834 20028 5303130013 NONBES NUSA TENGGARA TIMUR 26 Pre-Electrified - - - 123.82677 -10.21357 20029 5303130013 NONBES NUSA TENGGARA TIMUR 394 Pre-Electrified - - - 123.82856 -10.21140 Annex II – Demand forecast results Page 118 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 20030 5303130013 NONBES NUSA TENGGARA TIMUR 1 467 Pre-Electrified - - - 123.83173 -10.21489 20031 5303130013 NONBES NUSA TENGGARA TIMUR 148 Pre-Electrified - - - 123.82551 -10.21334 20032 5303130013 NONBES NUSA TENGGARA TIMUR 261 Pre-Electrified - - - 123.82438 -10.20831 20033 5303130013 NONBES NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 123.82383 -10.21159 20034 5303130013 NONBES NUSA TENGGARA TIMUR 339 Pre-Electrified - - - 123.82417 -10.21659 20035 5303130013 NONBES NUSA TENGGARA TIMUR 85 Pre-Electrified - - - 123.82190 -10.21792 20036 5303130013 NONBES NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 123.81742 -10.22333 20037 5303130014 KOTABES NUSA TENGGARA TIMUR 370 Pre-Electrified - - - 123.83168 -10.25437 20038 5303130014 KOTABES NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 123.83079 -10.25021 20039 5303130014 KOTABES NUSA TENGGARA TIMUR 233 Pre-Electrified - - - 123.82846 -10.24740 20040 5303130014 KOTABES NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 123.82720 -10.24101 20041 5303130014 KOTABES NUSA TENGGARA TIMUR 67 Pre-Electrified - - - 123.82714 -10.24344 20042 5303130014 KOTABES NUSA TENGGARA TIMUR 1 083 Pre-Electrified - - - 123.82590 -10.23321 20043 5303130015 PONAIN NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 123.87051 -10.20682 20044 5303130015 PONAIN NUSA TENGGARA TIMUR 89 Pre-Electrified - - - 123.86410 -10.20560 20045 5303130015 PONAIN NUSA TENGGARA TIMUR 36 Pre-Electrified - - - 123.85933 -10.20699 20046 5303130015 PONAIN NUSA TENGGARA TIMUR 23 Pre-Electrified - - - 123.85283 -10.21622 20047 5303130015 PONAIN NUSA TENGGARA TIMUR 129 Pre-Electrified - - - 123.85318 -10.23089 20048 5303130015 PONAIN NUSA TENGGARA TIMUR 430 Pre-Electrified - - - 123.85510 -10.20724 20049 5303130015 PONAIN NUSA TENGGARA TIMUR 34 Pre-Electrified - - - 123.85274 -10.23309 20050 5303130015 PONAIN NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 123.85167 -10.20527 20051 5303130015 PONAIN NUSA TENGGARA TIMUR 1 197 Pre-Electrified - - - 123.85296 -10.21080 20052 5303130016 TESBATAN NUSA TENGGARA TIMUR 79 Pre-Electrified - - - 123.87418 -10.20691 20053 5303130016 TESBATAN NUSA TENGGARA TIMUR 47 Pre-Electrified - - - 123.87559 -10.20725 20054 5303130016 TESBATAN NUSA TENGGARA TIMUR 1 040 Pre-Electrified - - - 123.88071 -10.20773 20055 5303130016 TESBATAN NUSA TENGGARA TIMUR 338 Pre-Electrified - - - 123.88104 -10.22384 20056 5303130019 APREN NUSA TENGGARA TIMUR 693 Pre-Electrified - - - 123.92833 -10.22486 20057 5303130019 APREN NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 123.91631 -10.22778 20058 5303130019 APREN NUSA TENGGARA TIMUR 703 Pre-Electrified - - - 123.91808 -10.23277 20059 5303130019 APREN NUSA TENGGARA TIMUR 245 Pre-Electrified - - - 123.92345 -10.23408 20060 5303130020 OENONI NUSA TENGGARA TIMUR 232 Pre-Electrified - - - 123.93721 -10.20917 20061 5303130020 OENONI NUSA TENGGARA TIMUR 67 Pre-Electrified - - - 123.92801 -10.21119 20062 5303130020 OENONI NUSA TENGGARA TIMUR 210 Pre-Electrified - - - 123.93424 -10.21051 20063 5303130020 OENONI NUSA TENGGARA TIMUR 193 Pre-Electrified - - - 123.91851 -10.21443 20064 5303130020 OENONI NUSA TENGGARA TIMUR 58 Pre-Electrified - - - 123.91746 -10.21558 20065 5303130020 OENONI NUSA TENGGARA TIMUR 590 Pre-Electrified - - - 123.92229 -10.21564 20066 5303130020 OENONI NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 123.92399 -10.21946 20067 5303130021 TESBATAN II NUSA TENGGARA TIMUR 318 Pre-Electrified - - - 123.89659 -10.20864 20068 5303130021 TESBATAN II NUSA TENGGARA TIMUR 289 Pre-Electrified - - - 123.90245 -10.21310 20069 5303130021 TESBATAN II NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 123.90938 -10.21367 20070 5303130021 TESBATAN II NUSA TENGGARA TIMUR 281 Pre-Electrified - - - 123.88773 -10.21513 20071 5303130021 TESBATAN II NUSA TENGGARA TIMUR 15 Pre-Electrified - - - 123.88789 -10.21745 20072 5303130022 OENONI II NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 123.96821 -10.19287 20073 5303130022 OENONI II NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 123.93948 -10.19713 20074 5303130022 OENONI II NUSA TENGGARA TIMUR 316 Pre-Electrified - - - 123.94339 -10.19589 20075 5303130022 OENONI II NUSA TENGGARA TIMUR - Pre-Electrified - - - 123.94240 -10.19661 20076 5303130022 OENONI II NUSA TENGGARA TIMUR 171 Pre-Electrified - - - 123.94017 -10.20109 20077 5303130022 OENONI II NUSA TENGGARA TIMUR 60 MiniGrid Systems 15 10 545 2.3 123.96001 -10.20494 20078 5303130022 OENONI II NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 123.93757 -10.20451 20079 5303130022 OENONI II NUSA TENGGARA TIMUR 28 MiniGrid Systems 7 4 921 1.1 123.96962 -10.20542 20080 5303130022 OENONI II NUSA TENGGARA TIMUR 513 Pre-Electrified - - - 123.94147 -10.20455 20081 5303131001 NEKBAUN NUSA TENGGARA TIMUR 154 Pre-Electrified - - - 123.70426 -10.30802 20082 5303131001 NEKBAUN NUSA TENGGARA TIMUR 820 Pre-Electrified - - - 123.69887 -10.30971 20083 5303131001 NEKBAUN NUSA TENGGARA TIMUR 25 Pre-Electrified - - - 123.69698 -10.31120 20084 5303131001 NEKBAUN NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 123.69470 -10.30848 20085 5303131001 NEKBAUN NUSA TENGGARA TIMUR 357 Pre-Electrified - - - 123.69067 -10.31213 20086 5303131001 NEKBAUN NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 123.68440 -10.31722 20087 5303131001 NEKBAUN NUSA TENGGARA TIMUR 25 Pre-Electrified - - - 123.67785 -10.34837 20088 5303131002 MERBAUN NUSA TENGGARA TIMUR 97 Pre-Electrified - - - 123.73267 -10.35381 20089 5303131002 MERBAUN NUSA TENGGARA TIMUR 87 Pre-Electrified - - - 123.72853 -10.35827 20090 5303131002 MERBAUN NUSA TENGGARA TIMUR 95 Pre-Electrified - - - 123.71725 -10.32903 20091 5303131002 MERBAUN NUSA TENGGARA TIMUR 121 Pre-Electrified - - - 123.71475 -10.33402 20092 5303131002 MERBAUN NUSA TENGGARA TIMUR 138 Pre-Electrified - - - 123.71463 -10.30873 20093 5303131002 MERBAUN NUSA TENGGARA TIMUR 137 Pre-Electrified - - - 123.71348 -10.33783 20094 5303131002 MERBAUN NUSA TENGGARA TIMUR 768 Pre-Electrified - - - 123.71304 -10.32038 20095 5303131002 MERBAUN NUSA TENGGARA TIMUR 419 Pre-Electrified - - - 123.71236 -10.31310 20096 5303131002 MERBAUN NUSA TENGGARA TIMUR 47 Pre-Electrified - - - 123.70437 -10.34892 20097 5303131002 MERBAUN NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 123.70413 -10.32242 20098 5303131002 MERBAUN NUSA TENGGARA TIMUR 61 Pre-Electrified - - - 123.68852 -10.35107 20099 5303131003 ERBAUN NUSA TENGGARA TIMUR 23 Pre-Electrified - - - 123.74913 -10.33810 20100 5303131003 ERBAUN NUSA TENGGARA TIMUR 365 Pre-Electrified - - - 123.74077 -10.35279 20101 5303131003 ERBAUN NUSA TENGGARA TIMUR 47 Pre-Electrified - - - 123.77909 -10.33738 20102 5303131003 ERBAUN NUSA TENGGARA TIMUR 152 Pre-Electrified - - - 123.77894 -10.33856 20103 5303131003 ERBAUN NUSA TENGGARA TIMUR 62 MiniGrid Systems 18 12 654 2.7 123.77470 -10.31769 20104 5303131003 ERBAUN NUSA TENGGARA TIMUR 86 Pre-Electrified - - - 123.76797 -10.34062 20105 5303131003 ERBAUN NUSA TENGGARA TIMUR 194 Pre-Electrified - - - 123.75421 -10.33235 20106 5303131003 ERBAUN NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 123.75198 -10.33612 20107 5303131003 ERBAUN NUSA TENGGARA TIMUR 142 Pre-Electrified - - - 123.75209 -10.33229 20108 5303131004 TEUNBAUN NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 123.72416 -10.30450 20109 5303131004 TEUNBAUN NUSA TENGGARA TIMUR 94 Pre-Electrified - - - 123.72336 -10.30193 20110 5303131004 TEUNBAUN NUSA TENGGARA TIMUR 92 Pre-Electrified - - - 123.72341 -10.29724 20111 5303131004 TEUNBAUN NUSA TENGGARA TIMUR 698 Pre-Electrified - - - 123.72427 -10.29408 20112 5303131004 TEUNBAUN NUSA TENGGARA TIMUR 91 Pre-Electrified - - - 123.72099 -10.30137 20113 5303131004 TEUNBAUN NUSA TENGGARA TIMUR 83 Pre-Electrified - - - 123.71882 -10.30179 20114 5303131004 TEUNBAUN NUSA TENGGARA TIMUR 998 Pre-Electrified - - - 123.71370 -10.29347 Annex II – Demand forecast results Page 119 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 20115 5303131005 TUNBAUN NUSA TENGGARA TIMUR 157 Pre-Electrified - - - 123.78564 -10.25145 20116 5303131005 TUNBAUN NUSA TENGGARA TIMUR 346 Pre-Electrified - - - 123.77546 -10.25617 20117 5303131005 TUNBAUN NUSA TENGGARA TIMUR 56 Pre-Electrified - - - 123.77461 -10.26155 20118 5303131005 TUNBAUN NUSA TENGGARA TIMUR 1 153 Pre-Electrified - - - 123.77897 -10.25392 20119 5303131005 TUNBAUN NUSA TENGGARA TIMUR 376 Pre-Electrified - - - 123.77370 -10.25835 20120 5303131005 TUNBAUN NUSA TENGGARA TIMUR 44 Pre-Electrified - - - 123.77131 -10.25036 20121 5303131005 TUNBAUN NUSA TENGGARA TIMUR 3 Pre-Electrified - - - 123.76901 -10.25006 20122 5303131005 TUNBAUN NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 123.76593 -10.26748 20123 5303131005 TUNBAUN NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 123.76449 -10.26618 20124 5303131005 TUNBAUN NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 123.76305 -10.26664 20125 5303131005 TUNBAUN NUSA TENGGARA TIMUR 75 Pre-Electrified - - - 123.76231 -10.25770 20126 5303131005 TUNBAUN NUSA TENGGARA TIMUR 96 Pre-Electrified - - - 123.76121 -10.26567 20127 5303131005 TUNBAUN NUSA TENGGARA TIMUR 173 Pre-Electrified - - - 123.75787 -10.26436 20128 5303131005 TUNBAUN NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 123.78455 -10.23375 20129 5303131005 TUNBAUN NUSA TENGGARA TIMUR 130 Pre-Electrified - - - 123.78451 -10.24777 20130 5303131005 TUNBAUN NUSA TENGGARA TIMUR 223 Pre-Electrified - - - 123.77071 -10.24802 20131 5303131005 TUNBAUN NUSA TENGGARA TIMUR 290 Pre-Electrified - - - 123.76829 -10.24822 20132 5303131006 SOBA NUSA TENGGARA TIMUR 149 Pre-Electrified - - - 123.73334 -10.28079 20133 5303131006 SOBA NUSA TENGGARA TIMUR 67 Pre-Electrified - - - 123.73128 -10.28253 20134 5303131006 SOBA NUSA TENGGARA TIMUR 1 278 Pre-Electrified - - - 123.72053 -10.28305 20135 5303131006 SOBA NUSA TENGGARA TIMUR 59 MiniGrid Systems 15 10 545 2.3 123.71105 -10.27880 20136 5303131007 NIUKBAUN NUSA TENGGARA TIMUR 51 Pre-Electrified - - - 123.70914 -10.30178 20137 5303131007 NIUKBAUN NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 123.70663 -10.29309 20138 5303131007 NIUKBAUN NUSA TENGGARA TIMUR 64 Pre-Electrified - - - 123.70464 -10.29551 20139 5303131007 NIUKBAUN NUSA TENGGARA TIMUR 44 Pre-Electrified - - - 123.70376 -10.30141 20140 5303131007 NIUKBAUN NUSA TENGGARA TIMUR 814 Pre-Electrified - - - 123.70421 -10.29071 20141 5303131007 NIUKBAUN NUSA TENGGARA TIMUR 412 Pre-Electrified - - - 123.69304 -10.29078 20142 5303131008 TOOBAUN NUSA TENGGARA TIMUR 160 Pre-Electrified - - - 123.74448 -10.27707 20143 5303131008 TOOBAUN NUSA TENGGARA TIMUR 120 Pre-Electrified - - - 123.73916 -10.27595 20144 5303131008 TOOBAUN NUSA TENGGARA TIMUR 175 Pre-Electrified - - - 123.73604 -10.27062 20145 5303131008 TOOBAUN NUSA TENGGARA TIMUR 542 Pre-Electrified - - - 123.73646 -10.27506 20146 5303132001 SAHRAEN NUSA TENGGARA TIMUR 121 Pre-Electrified - - - 123.81483 -10.31553 20147 5303132001 SAHRAEN NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 123.81304 -10.32463 20148 5303132001 SAHRAEN NUSA TENGGARA TIMUR 156 Pre-Electrified - - - 123.81325 -10.32068 20149 5303132001 SAHRAEN NUSA TENGGARA TIMUR 200 Pre-Electrified - - - 123.80843 -10.32459 20150 5303132001 SAHRAEN NUSA TENGGARA TIMUR 384 Pre-Electrified - - - 123.80269 -10.34256 20151 5303132001 SAHRAEN NUSA TENGGARA TIMUR 134 Pre-Electrified - - - 123.79948 -10.32388 20152 5303132001 SAHRAEN NUSA TENGGARA TIMUR 56 Pre-Electrified - - - 123.79776 -10.32457 20153 5303132001 SAHRAEN NUSA TENGGARA TIMUR 348 Pre-Electrified - - - 123.79090 -10.32711 20154 5303132001 SAHRAEN NUSA TENGGARA TIMUR 256 Pre-Electrified - - - 123.78423 -10.33134 20155 5303132001 SAHRAEN NUSA TENGGARA TIMUR 96 Pre-Electrified - - - 123.78184 -10.33503 20156 5303132002 RETRAEN NUSA TENGGARA TIMUR 251 Pre-Electrified - - - 123.84246 -10.30744 20157 5303132002 RETRAEN NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 123.84025 -10.31339 20158 5303132002 RETRAEN NUSA TENGGARA TIMUR 1 005 Pre-Electrified - - - 123.83786 -10.31376 20159 5303132002 RETRAEN NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 123.82495 -10.31247 20160 5303132002 RETRAEN NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 123.82258 -10.31245 20161 5303132002 RETRAEN NUSA TENGGARA TIMUR 261 Pre-Electrified - - - 123.81829 -10.31166 20162 5303132003 BURAEN NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 123.85579 -10.28945 20163 5303132003 BURAEN NUSA TENGGARA TIMUR 1 250 Pre-Electrified - - - 123.85327 -10.29480 20164 5303132003 BURAEN NUSA TENGGARA TIMUR 53 Pre-Electrified - - - 123.85118 -10.28750 20165 5303132003 BURAEN NUSA TENGGARA TIMUR 1 561 Pre-Electrified - - - 123.85916 -10.28521 20166 5303132004 NEKMESE NUSA TENGGARA TIMUR 128 Pre-Electrified - - - 123.86950 -10.26104 20167 5303132004 NEKMESE NUSA TENGGARA TIMUR 97 Pre-Electrified - - - 123.86876 -10.25811 20168 5303132004 NEKMESE NUSA TENGGARA TIMUR 87 Pre-Electrified - - - 123.86776 -10.26510 20169 5303132004 NEKMESE NUSA TENGGARA TIMUR 732 Pre-Electrified - - - 123.87301 -10.24458 20170 5303132004 NEKMESE NUSA TENGGARA TIMUR 1 033 Pre-Electrified - - - 123.87675 -10.24362 20171 5303132005 SONRAEN NUSA TENGGARA TIMUR - Pre-Electrified - - - 123.85053 -10.28726 20172 5303132005 SONRAEN NUSA TENGGARA TIMUR 29 Pre-Electrified - - - 123.84895 -10.28783 20173 5303132005 SONRAEN NUSA TENGGARA TIMUR 1 778 Pre-Electrified - - - 123.84373 -10.28613 20174 5303133001 PAKUBAUN NUSA TENGGARA TIMUR 137 Pre-Electrified - - - 123.99966 -10.21972 20175 5303133001 PAKUBAUN NUSA TENGGARA TIMUR 34 Pre-Electrified - - - 123.99989 -10.22351 20176 5303133001 PAKUBAUN NUSA TENGGARA TIMUR 71 Pre-Electrified - - - 124.00020 -10.22059 20177 5303133001 PAKUBAUN NUSA TENGGARA TIMUR 183 Pre-Electrified - - - 124.02222 -10.22959 20178 5303133001 PAKUBAUN NUSA TENGGARA TIMUR 900 Pre-Electrified - - - 124.00258 -10.22729 20179 5303133001 PAKUBAUN NUSA TENGGARA TIMUR 153 Pre-Electrified - - - 124.00801 -10.23272 20180 5303133001 PAKUBAUN NUSA TENGGARA TIMUR 806 Pre-Electrified - - - 124.02235 -10.23294 20181 5303133002 OEBESI NUSA TENGGARA TIMUR 373 Pre-Electrified - - - 123.98896 -10.18096 20182 5303133002 OEBESI NUSA TENGGARA TIMUR 44 Pre-Electrified - - - 123.99449 -10.18736 20183 5303133002 OEBESI NUSA TENGGARA TIMUR 157 Pre-Electrified - - - 123.99536 -10.19717 20184 5303133002 OEBESI NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 123.99538 -10.20355 20185 5303133002 OEBESI NUSA TENGGARA TIMUR 960 Pre-Electrified - - - 123.99768 -10.21475 20186 5303133002 OEBESI NUSA TENGGARA TIMUR 443 Pre-Electrified - - - 124.00673 -10.18114 20187 5303133004 ENORAEN NUSA TENGGARA TIMUR 30 MiniGrid Systems 9 6 327 1.4 124.10673 -10.15827 20188 5303140001 OEFAFI NUSA TENGGARA TIMUR 24 Pre-Electrified - - - 123.79451 -10.15252 20189 5303140001 OEFAFI NUSA TENGGARA TIMUR 141 Pre-Electrified - - - 123.79302 -10.14875 20190 5303140001 OEFAFI NUSA TENGGARA TIMUR 186 Pre-Electrified - - - 123.79256 -10.15196 20191 5303140001 OEFAFI NUSA TENGGARA TIMUR 95 Pre-Electrified - - - 123.78974 -10.14643 20192 5303140001 OEFAFI NUSA TENGGARA TIMUR 34 Pre-Electrified - - - 123.78906 -10.14447 20193 5303140001 OEFAFI NUSA TENGGARA TIMUR 155 Pre-Electrified - - - 123.78830 -10.14144 20194 5303140001 OEFAFI NUSA TENGGARA TIMUR 180 Pre-Electrified - - - 123.78155 -10.12654 20195 5303140001 OEFAFI NUSA TENGGARA TIMUR 118 Pre-Electrified - - - 123.77996 -10.13987 20196 5303140001 OEFAFI NUSA TENGGARA TIMUR 233 Pre-Electrified - - - 123.77882 -10.14432 20197 5303140001 OEFAFI NUSA TENGGARA TIMUR 235 Pre-Electrified - - - 123.77823 -10.15158 20198 5303140001 OEFAFI NUSA TENGGARA TIMUR 202 Pre-Electrified - - - 123.77789 -10.16011 20199 5303140001 OEFAFI NUSA TENGGARA TIMUR 128 Pre-Electrified - - - 123.77596 -10.18469 Annex II – Demand forecast results Page 120 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 20200 5303140001 OEFAFI NUSA TENGGARA TIMUR 44 Pre-Electrified - - - 123.77442 -10.13538 20201 5303140001 OEFAFI NUSA TENGGARA TIMUR 583 Pre-Electrified - - - 123.77569 -10.16451 20202 5303140002 TUATUKA NUSA TENGGARA TIMUR 130 Pre-Electrified - - - 123.85432 -10.17124 20203 5303140002 TUATUKA NUSA TENGGARA TIMUR 106 Pre-Electrified - - - 123.85139 -10.16955 20204 5303140002 TUATUKA NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 123.84677 -10.16778 20205 5303140002 TUATUKA NUSA TENGGARA TIMUR 141 Pre-Electrified - - - 123.84212 -10.16404 20206 5303140002 TUATUKA NUSA TENGGARA TIMUR 511 Pre-Electrified - - - 123.83710 -10.15629 20207 5303140002 TUATUKA NUSA TENGGARA TIMUR 729 Pre-Electrified - - - 123.83257 -10.15164 20208 5303140002 TUATUKA NUSA TENGGARA TIMUR 12 Pre-Electrified - - - 123.82038 -10.14941 20209 5303140002 TUATUKA NUSA TENGGARA TIMUR 551 Pre-Electrified - - - 123.82083 -10.15764 20210 5303140016 PUKDALE NUSA TENGGARA TIMUR 47 Pre-Electrified - - - 123.84026 -10.13244 20211 5303140016 PUKDALE NUSA TENGGARA TIMUR 312 Pre-Electrified - - - 123.83900 -10.13300 20212 5303140016 PUKDALE NUSA TENGGARA TIMUR 209 Pre-Electrified - - - 123.83574 -10.13124 20213 5303140016 PUKDALE NUSA TENGGARA TIMUR 101 Pre-Electrified - - - 123.83247 -10.12985 20214 5303140016 PUKDALE NUSA TENGGARA TIMUR 365 Pre-Electrified - - - 123.82526 -10.12839 20215 5303140016 PUKDALE NUSA TENGGARA TIMUR 812 Pre-Electrified - - - 123.83229 -10.12029 20216 5303140016 PUKDALE NUSA TENGGARA TIMUR 220 Pre-Electrified - - - 123.82897 -10.11549 20217 5303140016 PUKDALE NUSA TENGGARA TIMUR 182 Pre-Electrified - - - 123.82663 -10.11621 20218 5303140017 OESAO NUSA TENGGARA TIMUR 737 Pre-Electrified - - - 123.81395 -10.12633 20219 5303140017 OESAO NUSA TENGGARA TIMUR 215 Pre-Electrified - - - 123.81474 -10.11642 20220 5303140017 OESAO NUSA TENGGARA TIMUR 4 144 Pre-Electrified - - - 123.81082 -10.12361 20221 5303140017 OESAO NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 123.80663 -10.11874 20222 5303140017 OESAO NUSA TENGGARA TIMUR 109 Pre-Electrified - - - 123.80568 -10.11092 20223 5303140017 OESAO NUSA TENGGARA TIMUR 149 Pre-Electrified - - - 123.80455 -10.11474 20224 5303140017 OESAO NUSA TENGGARA TIMUR 326 Pre-Electrified - - - 123.80491 -10.11306 20225 5303140018 NAIBONAT NUSA TENGGARA TIMUR 325 Pre-Electrified - - - 123.87088 -10.07965 20226 5303140018 NAIBONAT NUSA TENGGARA TIMUR 686 Pre-Electrified - - - 123.86852 -10.08222 20227 5303140018 NAIBONAT NUSA TENGGARA TIMUR 374 Pre-Electrified - - - 123.86472 -10.08503 20228 5303140018 NAIBONAT NUSA TENGGARA TIMUR 508 Pre-Electrified - - - 123.86185 -10.08719 20229 5303140018 NAIBONAT NUSA TENGGARA TIMUR 2 143 Pre-Electrified - - - 123.85490 -10.09067 20230 5303140018 NAIBONAT NUSA TENGGARA TIMUR 190 Pre-Electrified - - - 123.84196 -10.09689 20231 5303140018 NAIBONAT NUSA TENGGARA TIMUR 159 Pre-Electrified - - - 123.84091 -10.09690 20232 5303140018 NAIBONAT NUSA TENGGARA TIMUR 6 155 Pre-Electrified - - - 123.82538 -10.10420 20233 5303140018 NAIBONAT NUSA TENGGARA TIMUR 113 Pre-Electrified - - - 123.87595 -10.07588 20234 5303140019 NUNKURUS NUSA TENGGARA TIMUR 166 Pre-Electrified - - - 123.85087 -10.04405 20235 5303140019 NUNKURUS NUSA TENGGARA TIMUR 200 Pre-Electrified - - - 123.84535 -10.04418 20236 5303140019 NUNKURUS NUSA TENGGARA TIMUR 838 Pre-Electrified - - - 123.83267 -10.04501 20237 5303140019 NUNKURUS NUSA TENGGARA TIMUR 1 224 Pre-Electrified - - - 123.82629 -10.06350 20238 5303140020 BABAU NUSA TENGGARA TIMUR 206 Pre-Electrified - - - 123.79517 -10.12780 20239 5303140020 BABAU NUSA TENGGARA TIMUR 2 187 Pre-Electrified - - - 123.80026 -10.10797 20240 5303140020 BABAU NUSA TENGGARA TIMUR 132 Pre-Electrified - - - 123.79302 -10.10787 20241 5303140020 BABAU NUSA TENGGARA TIMUR 972 Pre-Electrified - - - 123.78844 -10.10573 20242 5303140021 MERDEKA NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 123.78136 -10.12517 20243 5303140021 MERDEKA NUSA TENGGARA TIMUR 126 Pre-Electrified - - - 123.78193 -10.11851 20244 5303140021 MERDEKA NUSA TENGGARA TIMUR 412 Pre-Electrified - - - 123.78146 -10.12309 20245 5303140021 MERDEKA NUSA TENGGARA TIMUR 1 387 Pre-Electrified - - - 123.77932 -10.10678 20246 5303140021 MERDEKA NUSA TENGGARA TIMUR 193 Pre-Electrified - - - 123.76861 -10.09732 20247 5303140021 MERDEKA NUSA TENGGARA TIMUR 221 Pre-Electrified - - - 123.76702 -10.09529 20248 5303140021 MERDEKA NUSA TENGGARA TIMUR 474 Pre-Electrified - - - 123.76398 -10.09243 20249 5303140022 TUAPUKAN NUSA TENGGARA TIMUR 628 Pre-Electrified - - - 123.77053 -10.11050 20250 5303140022 TUAPUKAN NUSA TENGGARA TIMUR 3 295 Pre-Electrified - - - 123.77303 -10.10872 20251 5303140024 OESAO II NUSA TENGGARA TIMUR 353 Pre-Electrified - - - 123.81664 -10.13531 20252 5303140024 OESAO II NUSA TENGGARA TIMUR 1 165 Pre-Electrified - - - 123.81490 -10.12909 20253 5303140025 OELATIMO NUSA TENGGARA TIMUR 161 Pre-Electrified - - - 123.84563 -10.02863 20254 5303140025 OELATIMO NUSA TENGGARA TIMUR 330 Pre-Electrified - - - 123.84263 -10.02634 20255 5303140025 OELATIMO NUSA TENGGARA TIMUR 685 Pre-Electrified - - - 123.83651 -10.02236 20256 5303140026 TANAH PUTIH NUSA TENGGARA TIMUR 178 Pre-Electrified - - - 123.76200 -10.13198 20257 5303140026 TANAH PUTIH NUSA TENGGARA TIMUR - Pre-Electrified - - - 123.76023 -10.13336 20258 5303140026 TANAH PUTIH NUSA TENGGARA TIMUR 1 070 Pre-Electrified - - - 123.76735 -10.11893 20259 5303141001 PATHAU NUSA TENGGARA TIMUR 100 Pre-Electrified - - - 124.04257 -10.13484 20260 5303141002 MUKE NUSA TENGGARA TIMUR 85 MiniGrid Systems 23 16 169 3.5 124.08593 -10.12735 20261 5303141002 MUKE NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 124.10548 -10.10866 20262 5303141002 MUKE NUSA TENGGARA TIMUR 64 Pre-Electrified - - - 124.10485 -10.11030 20263 5303141002 MUKE NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 124.10527 -10.11293 20264 5303141002 MUKE NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 124.10490 -10.11566 20265 5303141002 MUKE NUSA TENGGARA TIMUR 34 Pre-Electrified - - - 124.10062 -10.11775 20266 5303141002 MUKE NUSA TENGGARA TIMUR 281 Pre-Electrified - - - 124.09743 -10.12261 20267 5303141002 MUKE NUSA TENGGARA TIMUR 51 Pre-Electrified - - - 124.09206 -10.12044 20268 5303141002 MUKE NUSA TENGGARA TIMUR 29 Pre-Electrified - - - 124.10477 -10.12103 20269 5303141002 MUKE NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 124.10812 -10.12167 20270 5303141004 OEMOFA NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 124.11194 -10.07805 20271 5303141004 OEMOFA NUSA TENGGARA TIMUR 1 139 Pre-Electrified - - - 124.11375 -10.08266 20272 5303141004 OEMOFA NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.09655 -10.08115 20273 5303141004 OEMOFA NUSA TENGGARA TIMUR 93 Pre-Electrified - - - 124.10767 -10.08361 20274 5303141004 OEMOFA NUSA TENGGARA TIMUR 475 Pre-Electrified - - - 124.11905 -10.08732 20275 5303141004 OEMOFA NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 124.11437 -10.09171 20276 5303141004 OEMOFA NUSA TENGGARA TIMUR 3 OffGrid Systems 1 703 0.2 124.12508 -10.07990 20277 5303141006 NUNMAFO NUSA TENGGARA TIMUR 51 Pre-Electrified - - - 124.06978 -10.07622 20278 5303141006 NUNMAFO NUSA TENGGARA TIMUR 1 143 Pre-Electrified - - - 124.08481 -10.08015 20279 5303141006 NUNMAFO NUSA TENGGARA TIMUR 86 Pre-Electrified - - - 124.09032 -10.08721 20280 5303141006 NUNMAFO NUSA TENGGARA TIMUR 15 Pre-Electrified - - - 124.11374 -10.09203 20281 5303141006 NUNMAFO NUSA TENGGARA TIMUR 61 Pre-Electrified - - - 124.10841 -10.09958 20282 5303141006 NUNMAFO NUSA TENGGARA TIMUR 388 Pre-Electrified - - - 124.11052 -10.09421 20283 5303141006 NUNMAFO NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 124.10765 -10.10397 20284 5303141007 OENUNUTONO NUSA TENGGARA TIMUR 127 Pre-Electrified - - - 124.04309 -10.12929 Annex II – Demand forecast results Page 121 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 20285 5303141007 OENUNUTONO NUSA TENGGARA TIMUR 667 Pre-Electrified - - - 124.06830 -10.09249 20286 5303141007 OENUNUTONO NUSA TENGGARA TIMUR 44 Pre-Electrified - - - 124.04321 -10.10594 20287 5303141007 OENUNUTONO NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 124.04213 -10.10772 20288 5303141007 OENUNUTONO NUSA TENGGARA TIMUR 347 Pre-Electrified - - - 124.04329 -10.11413 20289 5303141008 OENIKO NUSA TENGGARA TIMUR 181 Pre-Electrified - - - 124.01967 -10.12683 20290 5303141008 OENIKO NUSA TENGGARA TIMUR 85 Pre-Electrified - - - 124.01461 -10.13028 20291 5303141008 OENIKO NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 124.03934 -10.13206 20292 5303141008 OENIKO NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 124.02952 -10.13468 20293 5303141008 OENIKO NUSA TENGGARA TIMUR 22 Pre-Electrified - - - 124.03085 -10.13556 20294 5303141008 OENIKO NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 124.01894 -10.13937 20295 5303141008 OENIKO NUSA TENGGARA TIMUR 76 Pre-Electrified - - - 124.01435 -10.14108 20296 5303141008 OENIKO NUSA TENGGARA TIMUR 249 Pre-Electrified - - - 124.00827 -10.14306 20297 5303141008 OENIKO NUSA TENGGARA TIMUR 29 MiniGrid Systems 8 5 624 1.2 124.01617 -10.11038 20298 5303141008 OENIKO NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 124.02022 -10.12455 20299 5303142001 KUANHEUM NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 123.86995 -10.17282 20300 5303142001 KUANHEUM NUSA TENGGARA TIMUR 445 Pre-Electrified - - - 123.86264 -10.18684 20301 5303142001 KUANHEUM NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 123.85857 -10.17260 20302 5303142001 KUANHEUM NUSA TENGGARA TIMUR - Pre-Electrified - - - 123.85570 -10.17181 20303 5303142001 KUANHEUM NUSA TENGGARA TIMUR 315 Pre-Electrified - - - 123.87338 -10.17314 20304 5303142001 KUANHEUM NUSA TENGGARA TIMUR 119 Pre-Electrified - - - 123.87579 -10.17333 20305 5303142002 FATUKNUTU NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 123.91528 -10.15322 20306 5303142002 FATUKNUTU NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 123.91632 -10.15569 20307 5303142002 FATUKNUTU NUSA TENGGARA TIMUR 256 Pre-Electrified - - - 123.91846 -10.16057 20308 5303142002 FATUKNUTU NUSA TENGGARA TIMUR 394 Pre-Electrified - - - 123.91123 -10.16083 20309 5303142002 FATUKNUTU NUSA TENGGARA TIMUR 32 Pre-Electrified - - - 123.90521 -10.16586 20310 5303142002 FATUKNUTU NUSA TENGGARA TIMUR 356 Pre-Electrified - - - 123.89606 -10.17069 20311 5303142002 FATUKNUTU NUSA TENGGARA TIMUR 178 Pre-Electrified - - - 123.89152 -10.17228 20312 5303142003 KAIRANE NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 123.96751 -10.15422 20313 5303142003 KAIRANE NUSA TENGGARA TIMUR - Pre-Electrified - - - 123.94490 -10.15471 20314 5303142003 KAIRANE NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 123.94438 -10.15558 20315 5303142003 KAIRANE NUSA TENGGARA TIMUR 133 Pre-Electrified - - - 123.94009 -10.15619 20316 5303142003 KAIRANE NUSA TENGGARA TIMUR 319 Pre-Electrified - - - 123.93591 -10.15755 20317 5303142004 NIUNBAUN NUSA TENGGARA TIMUR 58 Pre-Electrified - - - 123.99454 -10.13505 20318 5303142004 NIUNBAUN NUSA TENGGARA TIMUR 92 Pre-Electrified - - - 123.99316 -10.13823 20319 5303142004 NIUNBAUN NUSA TENGGARA TIMUR 442 Pre-Electrified - - - 123.99490 -10.14843 20320 5303142005 RAKNAMO NUSA TENGGARA TIMUR 131 Pre-Electrified - - - 123.90366 -10.12826 20321 5303142005 RAKNAMO NUSA TENGGARA TIMUR 1 193 Pre-Electrified - - - 123.90568 -10.13339 20322 5303142005 RAKNAMO NUSA TENGGARA TIMUR 138 Pre-Electrified - - - 123.91476 -10.14002 20323 5303142005 RAKNAMO NUSA TENGGARA TIMUR 410 Pre-Electrified - - - 123.89902 -10.14652 20324 5303142005 RAKNAMO NUSA TENGGARA TIMUR 284 Pre-Electrified - - - 123.90076 -10.15208 20325 5303142007 OEFETO NUSA TENGGARA TIMUR 325 Pre-Electrified - - - 123.88691 -10.15273 20326 5303142007 OEFETO NUSA TENGGARA TIMUR - Pre-Electrified - - - 123.87928 -10.15373 20327 5303150001 SULAMU NUSA TENGGARA TIMUR 71 Pre-Electrified - - - 123.61785 -10.02280 20328 5303150001 SULAMU NUSA TENGGARA TIMUR 278 Pre-Electrified - - - 123.61242 -10.00916 20329 5303150001 SULAMU NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 123.60774 -10.01039 20330 5303150001 SULAMU NUSA TENGGARA TIMUR 108 Pre-Electrified - - - 123.60716 -10.00778 20331 5303150001 SULAMU NUSA TENGGARA TIMUR 2 190 Pre-Electrified - - - 123.60920 -10.02309 20332 5303150001 SULAMU NUSA TENGGARA TIMUR 2 689 Pre-Electrified - - - 123.60748 -10.04155 20333 5303150003 PARITI NUSA TENGGARA TIMUR 1 415 Pre-Electrified - - - 123.75285 -10.00726 20334 5303150003 PARITI NUSA TENGGARA TIMUR 1 710 Pre-Electrified - - - 123.75098 -10.00804 20335 5303150004 OETETA NUSA TENGGARA TIMUR 522 Pre-Electrified - - - 123.78772 -10.00671 20336 5303150004 OETETA NUSA TENGGARA TIMUR 220 Pre-Electrified - - - 123.78264 -10.00642 20337 5303150004 OETETA NUSA TENGGARA TIMUR 100 Pre-Electrified - - - 123.75767 -10.00310 20338 5303150004 OETETA NUSA TENGGARA TIMUR 1 280 Pre-Electrified - - - 123.75699 -10.01293 20339 5303150004 OETETA NUSA TENGGARA TIMUR 335 Pre-Electrified - - - 123.75532 -10.00616 20340 5303150005 BIPOLO NUSA TENGGARA TIMUR 67 Pre-Electrified - - - 123.83269 -10.02175 20341 5303150005 BIPOLO NUSA TENGGARA TIMUR 581 Pre-Electrified - - - 123.82113 -10.01849 20342 5303150005 BIPOLO NUSA TENGGARA TIMUR 967 Pre-Electrified - - - 123.79626 -10.00356 20343 5303160005 CAMPLONG II NUSA TENGGARA TIMUR 318 Pre-Electrified - - - 123.97782 -10.02095 20344 5303160005 CAMPLONG II NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 123.97626 -10.02295 20345 5303160005 CAMPLONG II NUSA TENGGARA TIMUR 247 Pre-Electrified - - - 123.97443 -10.02428 20346 5303160005 CAMPLONG II NUSA TENGGARA TIMUR 59 MiniGrid Systems 17 11 951 2.6 123.92092 -10.02573 20347 5303160005 CAMPLONG II NUSA TENGGARA TIMUR 303 Pre-Electrified - - - 123.96906 -10.02720 20348 5303160005 CAMPLONG II NUSA TENGGARA TIMUR 117 Pre-Electrified - - - 123.95890 -10.03351 20349 5303160005 CAMPLONG II NUSA TENGGARA TIMUR 84 Pre-Electrified - - - 123.95379 -10.03400 20350 5303160005 CAMPLONG II NUSA TENGGARA TIMUR 305 Pre-Electrified - - - 123.92265 -10.03489 20351 5303160005 CAMPLONG II NUSA TENGGARA TIMUR 705 Pre-Electrified - - - 123.92655 -10.03674 20352 5303160006 CAMPLONG I NUSA TENGGARA TIMUR 69 Pre-Electrified - - - 123.91671 -10.04011 20353 5303160006 CAMPLONG I NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 123.92046 -10.04106 20354 5303160006 CAMPLONG I NUSA TENGGARA TIMUR 1 867 Pre-Electrified - - - 123.92341 -10.04104 20355 5303160006 CAMPLONG I NUSA TENGGARA TIMUR - Pre-Electrified - - - 123.92252 -10.04300 20356 5303160006 CAMPLONG I NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 123.91901 -10.04359 20357 5303160006 CAMPLONG I NUSA TENGGARA TIMUR 160 Pre-Electrified - - - 123.92001 -10.04255 20358 5303160006 CAMPLONG I NUSA TENGGARA TIMUR 55 Pre-Electrified - - - 123.91542 -10.04415 20359 5303160006 CAMPLONG I NUSA TENGGARA TIMUR 141 Pre-Electrified - - - 123.91568 -10.04524 20360 5303160006 CAMPLONG I NUSA TENGGARA TIMUR 94 Pre-Electrified - - - 123.91070 -10.04522 20361 5303160006 CAMPLONG I NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 123.91435 -10.04566 20362 5303160006 CAMPLONG I NUSA TENGGARA TIMUR 885 Pre-Electrified - - - 123.92109 -10.04512 20363 5303160006 CAMPLONG I NUSA TENGGARA TIMUR 73 Pre-Electrified - - - 123.91304 -10.04637 20364 5303160006 CAMPLONG I NUSA TENGGARA TIMUR 321 Pre-Electrified - - - 123.90633 -10.04729 20365 5303160006 CAMPLONG I NUSA TENGGARA TIMUR 566 Pre-Electrified - - - 123.90103 -10.04695 20366 5303160006 CAMPLONG I NUSA TENGGARA TIMUR 81 Pre-Electrified - - - 123.88900 -10.05009 20367 5303160006 CAMPLONG I NUSA TENGGARA TIMUR 195 Pre-Electrified - - - 123.89054 -10.05133 20368 5303160007 NAUNU NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 123.92209 -10.05282 20369 5303160007 NAUNU NUSA TENGGARA TIMUR 99 Pre-Electrified - - - 123.92273 -10.05394 Annex II – Demand forecast results Page 122 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 20370 5303160007 NAUNU NUSA TENGGARA TIMUR - Pre-Electrified - - - 123.92113 -10.05397 20371 5303160007 NAUNU NUSA TENGGARA TIMUR 335 Pre-Electrified - - - 123.92552 -10.05622 20372 5303160007 NAUNU NUSA TENGGARA TIMUR 297 Pre-Electrified - - - 123.92264 -10.05729 20373 5303160007 NAUNU NUSA TENGGARA TIMUR 544 Pre-Electrified - - - 123.92831 -10.05729 20374 5303160007 NAUNU NUSA TENGGARA TIMUR 129 Pre-Electrified - - - 123.92399 -10.05902 20375 5303160008 OEBOLA NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 123.99940 -10.06859 20376 5303160008 OEBOLA NUSA TENGGARA TIMUR 73 Pre-Electrified - - - 123.99500 -10.07077 20377 5303160008 OEBOLA NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 123.99320 -10.07161 20378 5303160008 OEBOLA NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 123.97570 -10.07278 20379 5303160008 OEBOLA NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 123.97264 -10.07405 20380 5303160008 OEBOLA NUSA TENGGARA TIMUR 79 Pre-Electrified - - - 123.97480 -10.07451 20381 5303160008 OEBOLA NUSA TENGGARA TIMUR 34 Pre-Electrified - - - 123.98823 -10.07443 20382 5303160008 OEBOLA NUSA TENGGARA TIMUR 74 Pre-Electrified - - - 123.97109 -10.07526 20383 5303160008 OEBOLA NUSA TENGGARA TIMUR 119 Pre-Electrified - - - 123.97418 -10.07716 20384 5303160008 OEBOLA NUSA TENGGARA TIMUR 29 MiniGrid Systems 7 4 921 1.1 123.95982 -10.07763 20385 5303160008 OEBOLA NUSA TENGGARA TIMUR 58 Pre-Electrified - - - 123.96860 -10.07803 20386 5303160008 OEBOLA NUSA TENGGARA TIMUR 97 Pre-Electrified - - - 123.96627 -10.07818 20387 5303160008 OEBOLA NUSA TENGGARA TIMUR 991 Pre-Electrified - - - 124.00505 -10.06885 20388 5303160009 SILLU NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 123.96300 -10.03470 20389 5303160009 SILLU NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 123.99142 -10.04516 20390 5303160009 SILLU NUSA TENGGARA TIMUR 206 Pre-Electrified - - - 123.97087 -10.04486 20391 5303160009 SILLU NUSA TENGGARA TIMUR 290 Pre-Electrified - - - 123.97645 -10.04572 20392 5303160009 SILLU NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 123.99835 -10.04621 20393 5303160009 SILLU NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 123.99490 -10.04560 20394 5303160009 SILLU NUSA TENGGARA TIMUR 99 Pre-Electrified - - - 123.97379 -10.04600 20395 5303160009 SILLU NUSA TENGGARA TIMUR 474 Pre-Electrified - - - 123.98195 -10.04729 20396 5303160009 SILLU NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 123.99685 -10.04728 20397 5303160009 SILLU NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 123.97452 -10.04950 20398 5303160009 SILLU NUSA TENGGARA TIMUR 165 Pre-Electrified - - - 123.98729 -10.05062 20399 5303160009 SILLU NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 123.98948 -10.05214 20400 5303160009 SILLU NUSA TENGGARA TIMUR 51 Pre-Electrified - - - 123.99103 -10.05288 20401 5303160009 SILLU NUSA TENGGARA TIMUR 71 MiniGrid Systems 15 10 545 2.3 124.10235 -10.00699 20402 5303160009 SILLU NUSA TENGGARA TIMUR 104 Pre-Electrified - - - 124.00112 -10.04773 20403 5303160009 SILLU NUSA TENGGARA TIMUR 117 Pre-Electrified - - - 124.06528 -10.07754 20404 5303160012 KUIMASI NUSA TENGGARA TIMUR - Pre-Electrified - - - 123.87746 -10.05792 20405 5303160012 KUIMASI NUSA TENGGARA TIMUR 604 Pre-Electrified - - - 123.88232 -10.05946 20406 5303160012 KUIMASI NUSA TENGGARA TIMUR 456 Pre-Electrified - - - 123.88149 -10.06066 20407 5303160012 KUIMASI NUSA TENGGARA TIMUR 362 Pre-Electrified - - - 123.88032 -10.06320 20408 5303160012 KUIMASI NUSA TENGGARA TIMUR 410 Pre-Electrified - - - 123.88376 -10.06329 20409 5303160013 OEBOLA DALAM NUSA TENGGARA TIMUR 143 Pre-Electrified - - - 123.93750 -10.04026 20410 5303160013 OEBOLA DALAM NUSA TENGGARA TIMUR 930 Pre-Electrified - - - 123.93494 -10.04302 20411 5303160013 OEBOLA DALAM NUSA TENGGARA TIMUR 92 Pre-Electrified - - - 123.93337 -10.04515 20412 5303160013 OEBOLA DALAM NUSA TENGGARA TIMUR 190 Pre-Electrified - - - 123.93180 -10.04571 20413 5303162002 POTO NUSA TENGGARA TIMUR 83 MiniGrid Systems 20 14 060 3.0 123.69534 -9.92076 20414 5303162003 NAITAE NUSA TENGGARA TIMUR 66 MiniGrid Systems 15 10 545 2.3 123.67165 -9.84586 20415 5303162003 NAITAE NUSA TENGGARA TIMUR 468 MiniGrid Systems 101 71 003 15.3 123.80632 -9.86627 20416 5303162005 TUAKAU NUSA TENGGARA TIMUR 81 MiniGrid Systems 19 13 357 2.9 123.70384 -9.75990 20417 5303170001 TAKARI NUSA TENGGARA TIMUR 14 OffGrid Systems 5 3 515 0.8 124.04001 -10.00974 20418 5303170001 TAKARI NUSA TENGGARA TIMUR 22 Pre-Electrified - - - 124.04859 -9.96814 20419 5303170001 TAKARI NUSA TENGGARA TIMUR 508 Pre-Electrified - - - 124.04702 -9.97316 20420 5303170001 TAKARI NUSA TENGGARA TIMUR 34 Pre-Electrified - - - 124.05718 -9.97107 20421 5303170001 TAKARI NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 124.04822 -9.97113 20422 5303170001 TAKARI NUSA TENGGARA TIMUR 659 Pre-Electrified - - - 124.05369 -9.97208 20423 5303170001 TAKARI NUSA TENGGARA TIMUR 53 Pre-Electrified - - - 124.07404 -9.97624 20424 5303170001 TAKARI NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 124.08357 -9.97727 20425 5303170001 TAKARI NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 124.05614 -9.97793 20426 5303170001 TAKARI NUSA TENGGARA TIMUR 89 Pre-Electrified - - - 124.05876 -9.98003 20427 5303170001 TAKARI NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 124.05444 -9.97919 20428 5303170001 TAKARI NUSA TENGGARA TIMUR 385 Pre-Electrified - - - 124.07006 -9.97362 20429 5303170001 TAKARI NUSA TENGGARA TIMUR 374 Pre-Electrified - - - 124.06145 -9.97296 20430 5303170001 TAKARI NUSA TENGGARA TIMUR 877 Pre-Electrified - - - 124.08057 -9.97653 20431 5303170002 NOELMINA NUSA TENGGARA TIMUR 3 OffGrid Systems 1 703 0.2 124.07756 -10.00004 20432 5303170002 NOELMINA NUSA TENGGARA TIMUR 462 Pre-Electrified - - - 124.08837 -9.97519 20433 5303170002 NOELMINA NUSA TENGGARA TIMUR 64 Pre-Electrified - - - 124.09460 -9.97693 20434 5303170002 NOELMINA NUSA TENGGARA TIMUR 15 Pre-Electrified - - - 124.12284 -9.97678 20435 5303170002 NOELMINA NUSA TENGGARA TIMUR 229 Pre-Electrified - - - 124.09123 -9.97833 20436 5303170002 NOELMINA NUSA TENGGARA TIMUR 116 Pre-Electrified - - - 124.10584 -9.97837 20437 5303170002 NOELMINA NUSA TENGGARA TIMUR 250 Pre-Electrified - - - 124.11623 -9.98149 20438 5303170002 NOELMINA NUSA TENGGARA TIMUR 84 Pre-Electrified - - - 124.11161 -9.97956 20439 5303170002 NOELMINA NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 124.08469 -9.97703 20440 5303170002 NOELMINA NUSA TENGGARA TIMUR 85 MiniGrid Systems 24 16 872 3.6 124.09513 -9.99782 20441 5303170003 BENU NUSA TENGGARA TIMUR 28 OffGrid Systems 6 4 218 0.9 124.02134 -9.95630 20442 5303170003 BENU NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 124.07789 -9.95702 20443 5303170003 BENU NUSA TENGGARA TIMUR 161 Pre-Electrified - - - 124.06571 -9.95857 20444 5303170003 BENU NUSA TENGGARA TIMUR 153 Pre-Electrified - - - 124.07267 -9.96674 20445 5303170003 BENU NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 124.08346 -9.96868 20446 5303170003 BENU NUSA TENGGARA TIMUR 51 Pre-Electrified - - - 124.06185 -9.95195 20447 5303170003 BENU NUSA TENGGARA TIMUR 31 Pre-Electrified - - - 124.06217 -9.95422 20448 5303170003 BENU NUSA TENGGARA TIMUR 71 Pre-Electrified - - - 124.07516 -9.97526 20449 5303170004 HUEKNUTU NUSA TENGGARA TIMUR 107 Pre-Electrified - - - 124.03078 -9.87840 20450 5303170004 HUEKNUTU NUSA TENGGARA TIMUR 82 Pre-Electrified - - - 124.03322 -9.88086 20451 5303170004 HUEKNUTU NUSA TENGGARA TIMUR 84 Pre-Electrified - - - 124.01841 -9.85132 20452 5303170004 HUEKNUTU NUSA TENGGARA TIMUR 287 Pre-Electrified - - - 124.02138 -9.85677 20453 5303170004 HUEKNUTU NUSA TENGGARA TIMUR 62 MiniGrid Systems 16 11 248 2.4 124.05273 -9.85764 20454 5303170004 HUEKNUTU NUSA TENGGARA TIMUR 76 Pre-Electrified - - - 124.01951 -9.86314 Annex II – Demand forecast results Page 123 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 20455 5303170004 HUEKNUTU NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 124.02509 -9.85660 20456 5303170005 KAUNIKI NUSA TENGGARA TIMUR 157 Pre-Electrified - - - 124.01339 -9.79059 20457 5303170005 KAUNIKI NUSA TENGGARA TIMUR 203 Pre-Electrified - - - 124.01596 -9.79884 20458 5303170005 KAUNIKI NUSA TENGGARA TIMUR 443 Pre-Electrified - - - 124.00240 -9.76603 20459 5303170005 KAUNIKI NUSA TENGGARA TIMUR 54 MiniGrid Systems 12 8 436 1.8 124.01639 -9.76828 20460 5303170005 KAUNIKI NUSA TENGGARA TIMUR 71 Pre-Electrified - - - 124.00510 -9.77804 20461 5303170005 KAUNIKI NUSA TENGGARA TIMUR 175 Pre-Electrified - - - 124.01630 -9.83394 20462 5303170005 KAUNIKI NUSA TENGGARA TIMUR 222 Pre-Electrified - - - 124.01377 -9.84727 20463 5303170007 TANINI NUSA TENGGARA TIMUR 77 MiniGrid Systems 20 14 060 3.0 123.89843 -9.84551 20464 5303170008 OESUSU NUSA TENGGARA TIMUR 225 Pre-Electrified - - - 124.03081 -9.96927 20465 5303170008 OESUSU NUSA TENGGARA TIMUR 111 Pre-Electrified - - - 124.03780 -9.97092 20466 5303170008 OESUSU NUSA TENGGARA TIMUR 452 Pre-Electrified - - - 124.02230 -9.97211 20467 5303170008 OESUSU NUSA TENGGARA TIMUR 172 Pre-Electrified - - - 124.04220 -9.97089 20468 5303170008 OESUSU NUSA TENGGARA TIMUR 29 Pre-Electrified - - - 124.02046 -9.97127 20469 5303170008 OESUSU NUSA TENGGARA TIMUR 77 Pre-Electrified - - - 124.01880 -9.97712 20470 5303170008 OESUSU NUSA TENGGARA TIMUR 19 OffGrid Systems 5 3 515 0.8 124.03647 -9.99020 20471 5303170008 OESUSU NUSA TENGGARA TIMUR 101 MiniGrid Systems 25 17 575 3.8 124.03297 -9.99265 20472 5303170009 TUAPANAF NUSA TENGGARA TIMUR 162 Pre-Electrified - - - 124.05982 -9.92928 20473 5303170009 TUAPANAF NUSA TENGGARA TIMUR 547 Pre-Electrified - - - 124.06097 -9.94727 20474 5303170009 TUAPANAF NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 124.06314 -9.94662 20475 5303170009 TUAPANAF NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 124.04171 -9.89939 20476 5303170009 TUAPANAF NUSA TENGGARA TIMUR 237 Pre-Electrified - - - 124.03762 -9.90409 20477 5303170009 TUAPANAF NUSA TENGGARA TIMUR 283 Pre-Electrified - - - 124.04709 -9.90706 20478 5303170009 TUAPANAF NUSA TENGGARA TIMUR 168 Pre-Electrified - - - 124.05670 -9.91867 20479 5303170009 TUAPANAF NUSA TENGGARA TIMUR 82 Pre-Electrified - - - 124.05755 -9.92421 20480 5303170009 TUAPANAF NUSA TENGGARA TIMUR 38 MiniGrid Systems 10 7 030 1.5 124.07810 -9.92692 20481 5303170009 TUAPANAF NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 124.05393 -9.91325 20482 5303170009 TUAPANAF NUSA TENGGARA TIMUR 108 Pre-Electrified - - - 124.06129 -9.94885 20483 5303180002 FATUMETAN NUSA TENGGARA TIMUR 2 OffGrid Systems 1 703 0.2 123.95658 -9.73743 20484 5303180003 OHAEM I NUSA TENGGARA TIMUR 55 MiniGrid Systems 13 9 139 2.0 123.99105 -9.70308 20485 5303180003 OHAEM I NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 123.98755 -9.70478 20486 5303180003 OHAEM I NUSA TENGGARA TIMUR 174 Pre-Electrified - - - 123.98880 -9.71605 20487 5303180003 OHAEM I NUSA TENGGARA TIMUR 44 Pre-Electrified - - - 123.99951 -9.71406 20488 5303180003 OHAEM I NUSA TENGGARA TIMUR 83 Pre-Electrified - - - 123.99772 -9.71532 20489 5303180003 OHAEM I NUSA TENGGARA TIMUR 491 Pre-Electrified - - - 123.99745 -9.71773 20490 5303180003 OHAEM I NUSA TENGGARA TIMUR 225 Pre-Electrified - - - 123.98831 -9.72366 20491 5303180003 OHAEM I NUSA TENGGARA TIMUR 19 Pre-Electrified - - - 123.99751 -9.72501 20492 5303180003 OHAEM I NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 123.99714 -9.72787 20493 5303180003 OHAEM I NUSA TENGGARA TIMUR 46 MiniGrid Systems 11 7 733 1.7 123.98608 -9.72852 20494 5303180003 OHAEM I NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 124.00066 -9.71380 20495 5303180003 OHAEM I NUSA TENGGARA TIMUR 504 Pre-Electrified - - - 124.00388 -9.71701 20496 5303180008 LELOBOKO NUSA TENGGARA TIMUR 76 Pre-Electrified - - - 123.93865 -9.69746 20497 5303180009 LELOGAMA NUSA TENGGARA TIMUR 1 562 Pre-Electrified - - - 123.95811 -9.70460 20498 5303180009 LELOGAMA NUSA TENGGARA TIMUR 85 Pre-Electrified - - - 123.95893 -9.69839 20499 5303180009 LELOGAMA NUSA TENGGARA TIMUR 219 Pre-Electrified - - - 123.96456 -9.70114 20500 5303180009 LELOGAMA NUSA TENGGARA TIMUR 146 Pre-Electrified - - - 123.95412 -9.71122 20501 5303180009 LELOGAMA NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 123.95659 -9.71223 20502 5303180009 LELOGAMA NUSA TENGGARA TIMUR 131 Pre-Electrified - - - 123.95823 -9.71510 20503 5303180009 LELOGAMA NUSA TENGGARA TIMUR 22 OffGrid Systems 5 3 515 0.8 123.96103 -9.71928 20504 5303180009 LELOGAMA NUSA TENGGARA TIMUR 110 Pre-Electrified - - - 123.95899 -9.70679 20505 5303180010 OELBANU NUSA TENGGARA TIMUR 63 MiniGrid Systems 15 10 545 2.3 123.85866 -9.71182 20506 5303180011 OHAEM II NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 124.00096 -9.76594 20507 5303181002 NEFONEUT NUSA TENGGARA TIMUR 6 OffGrid Systems 2 1 406 0.3 123.74984 -9.72157 20508 5303181002 NEFONEUT NUSA TENGGARA TIMUR 118 MiniGrid Systems 30 21 090 4.6 123.74211 -9.71935 20509 5303181002 NEFONEUT NUSA TENGGARA TIMUR 157 MiniGrid Systems 40 28 120 6.1 123.78165 -9.71843 20510 5303181002 NEFONEUT NUSA TENGGARA TIMUR 175 MiniGrid Systems 45 31 635 6.8 123.75145 -9.72389 20511 5303182004 BITOBE NUSA TENGGARA TIMUR 70 MiniGrid Systems 16 11 248 2.4 124.01455 -9.61799 20512 5303190007 AFOAN NUSA TENGGARA TIMUR 1 152 Pre-Electrified - - - 123.80156 -9.49374 20513 5303190008 NAIKLIU NUSA TENGGARA TIMUR 61 Pre-Electrified - - - 123.82610 -9.50026 20514 5303190008 NAIKLIU NUSA TENGGARA TIMUR 247 Pre-Electrified - - - 123.84785 -9.48626 20515 5303190008 NAIKLIU NUSA TENGGARA TIMUR 281 Pre-Electrified - - - 123.83846 -9.48846 20516 5303190008 NAIKLIU NUSA TENGGARA TIMUR 102 Pre-Electrified - - - 123.83645 -9.49671 20517 5303190008 NAIKLIU NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 123.83861 -9.49965 20518 5303190008 NAIKLIU NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 123.82693 -9.49989 20519 5303190008 NAIKLIU NUSA TENGGARA TIMUR 483 Pre-Electrified - - - 123.82962 -9.49634 20520 5303190009 FATUNAUS NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 123.84607 -9.48867 20521 5303190009 FATUNAUS NUSA TENGGARA TIMUR 419 Pre-Electrified - - - 123.84504 -9.48966 20522 5303191005 OELFATU NUSA TENGGARA TIMUR 63 MiniGrid Systems 16 11 248 2.4 123.78217 -9.58235 20523 5303191006 SOLIU NUSA TENGGARA TIMUR 1 OffGrid Systems 1 703 0.2 123.74903 -9.57348 20524 5303191006 SOLIU NUSA TENGGARA TIMUR - Pre-Electrified - - - 123.75225 -9.56774 20525 5303192001 NUNUANAH NUSA TENGGARA TIMUR 71 MiniGrid Systems 17 11 951 2.6 123.99768 -9.41280 20526 5304010004 NEFOKOKO NUSA TENGGARA TIMUR 51 MiniGrid Systems 13 9 139 2.0 124.16348 -9.72585 20527 5304010006 NETPALA NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.25305 -9.75725 20528 5304010006 NETPALA NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 124.26620 -9.73936 20529 5304010006 NETPALA NUSA TENGGARA TIMUR 91 Pre-Electrified - - - 124.26749 -9.74328 20530 5304010006 NETPALA NUSA TENGGARA TIMUR 81 Pre-Electrified - - - 124.26495 -9.74316 20531 5304010006 NETPALA NUSA TENGGARA TIMUR 124 Pre-Electrified - - - 124.26524 -9.74439 20532 5304010006 NETPALA NUSA TENGGARA TIMUR 104 Pre-Electrified - - - 124.26167 -9.74800 20533 5304010006 NETPALA NUSA TENGGARA TIMUR 81 Pre-Electrified - - - 124.26923 -9.73714 20534 5304010007 OBESI NUSA TENGGARA TIMUR 32 Pre-Electrified - - - 124.27151 -9.71407 20535 5304010007 OBESI NUSA TENGGARA TIMUR 131 Pre-Electrified - - - 124.27400 -9.71476 20536 5304010007 OBESI NUSA TENGGARA TIMUR 79 Pre-Electrified - - - 124.27222 -9.71535 20537 5304010007 OBESI NUSA TENGGARA TIMUR 1 060 Pre-Electrified - - - 124.27796 -9.72817 20538 5304010007 OBESI NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 124.27391 -9.72918 20539 5304010007 OBESI NUSA TENGGARA TIMUR 34 Pre-Electrified - - - 124.27229 -9.72945 Annex II – Demand forecast results Page 124 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 20540 5304010007 OBESI NUSA TENGGARA TIMUR 591 Pre-Electrified - - - 124.26934 -9.73000 20541 5304010007 OBESI NUSA TENGGARA TIMUR 217 Pre-Electrified - - - 124.27385 -9.73479 20542 5304010008 EON BESI NUSA TENGGARA TIMUR 36 Pre-Electrified - - - 124.26953 -9.75223 20543 5304010008 EON BESI NUSA TENGGARA TIMUR 190 Pre-Electrified - - - 124.27971 -9.73281 20544 5304010008 EON BESI NUSA TENGGARA TIMUR 572 Pre-Electrified - - - 124.27324 -9.74098 20545 5304010008 EON BESI NUSA TENGGARA TIMUR 26 Pre-Electrified - - - 124.27823 -9.73642 20546 5304010008 EON BESI NUSA TENGGARA TIMUR 167 Pre-Electrified - - - 124.27999 -9.73996 20547 5304010008 EON BESI NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 124.28094 -9.74228 20548 5304010008 EON BESI NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 124.27106 -9.74859 20549 5304010009 BOSEN NUSA TENGGARA TIMUR 3 OffGrid Systems 1 703 0.2 124.29991 -9.70718 20550 5304010010 SEBOT NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 124.27415 -9.68603 20551 5304010010 SEBOT NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 124.27599 -9.68644 20552 5304010010 SEBOT NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 124.27850 -9.68845 20553 5304010010 SEBOT NUSA TENGGARA TIMUR 103 Pre-Electrified - - - 124.27465 -9.68921 20554 5304010010 SEBOT NUSA TENGGARA TIMUR 216 Pre-Electrified - - - 124.28031 -9.69274 20555 5304010010 SEBOT NUSA TENGGARA TIMUR 129 Pre-Electrified - - - 124.28593 -9.69007 20556 5304010010 SEBOT NUSA TENGGARA TIMUR 100 Pre-Electrified - - - 124.27218 -9.69067 20557 5304010010 SEBOT NUSA TENGGARA TIMUR 61 Pre-Electrified - - - 124.27138 -9.69407 20558 5304010010 SEBOT NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 124.27967 -9.69459 20559 5304010010 SEBOT NUSA TENGGARA TIMUR 8 Pre-Electrified - - - 124.28232 -9.68863 20560 5304010011 AJAOBAKI NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 124.24667 -9.69152 20561 5304010011 AJAOBAKI NUSA TENGGARA TIMUR 242 Pre-Electrified - - - 124.24936 -9.69661 20562 5304010011 AJAOBAKI NUSA TENGGARA TIMUR 81 Pre-Electrified - - - 124.24699 -9.69711 20563 5304010011 AJAOBAKI NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 124.24993 -9.69791 20564 5304010011 AJAOBAKI NUSA TENGGARA TIMUR 22 Pre-Electrified - - - 124.24379 -9.69222 20565 5304010011 AJAOBAKI NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 124.24739 -9.69265 20566 5304010011 AJAOBAKI NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 124.24315 -9.69283 20567 5304010011 AJAOBAKI NUSA TENGGARA TIMUR 85 Pre-Electrified - - - 124.25035 -9.69567 20568 5304010011 AJAOBAKI NUSA TENGGARA TIMUR 125 Pre-Electrified - - - 124.25039 -9.69852 20569 5304010011 AJAOBAKI NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 124.25549 -9.70271 20570 5304010011 AJAOBAKI NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 124.25316 -9.70269 20571 5304010011 AJAOBAKI NUSA TENGGARA TIMUR 114 Pre-Electrified - - - 124.25424 -9.70614 20572 5304010011 AJAOBAKI NUSA TENGGARA TIMUR 17 Pre-Electrified - - - 124.25703 -9.71131 20573 5304010011 AJAOBAKI NUSA TENGGARA TIMUR 164 Pre-Electrified - - - 124.25834 -9.71316 20574 5304010011 AJAOBAKI NUSA TENGGARA TIMUR 156 Pre-Electrified - - - 124.26085 -9.71587 20575 5304010011 AJAOBAKI NUSA TENGGARA TIMUR 139 Pre-Electrified - - - 124.26314 -9.71774 20576 5304010011 AJAOBAKI NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 124.26476 -9.71880 20577 5304010011 AJAOBAKI NUSA TENGGARA TIMUR 131 Pre-Electrified - - - 124.26732 -9.71985 20578 5304010011 AJAOBAKI NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 124.26599 -9.71927 20579 5304010011 AJAOBAKI NUSA TENGGARA TIMUR 195 Pre-Electrified - - - 124.25652 -9.70950 20580 5304010012 BIJAEPUNU NUSA TENGGARA TIMUR 139 Pre-Electrified - - - 124.27446 -9.67559 20581 5304010012 BIJAEPUNU NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 124.27140 -9.67529 20582 5304010012 BIJAEPUNU NUSA TENGGARA TIMUR 151 Pre-Electrified - - - 124.25824 -9.67976 20583 5304010012 BIJAEPUNU NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 124.25941 -9.68155 20584 5304010012 BIJAEPUNU NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 124.25932 -9.68459 20585 5304010012 BIJAEPUNU NUSA TENGGARA TIMUR 463 Pre-Electrified - - - 124.27271 -9.68229 20586 5304010012 BIJAEPUNU NUSA TENGGARA TIMUR 69 Pre-Electrified - - - 124.25895 -9.68689 20587 5304010012 BIJAEPUNU NUSA TENGGARA TIMUR 124 Pre-Electrified - - - 124.26549 -9.68730 20588 5304010012 BIJAEPUNU NUSA TENGGARA TIMUR 89 Pre-Electrified - - - 124.25895 -9.68885 20589 5304010012 BIJAEPUNU NUSA TENGGARA TIMUR 51 Pre-Electrified - - - 124.25717 -9.69102 20590 5304010012 BIJAEPUNU NUSA TENGGARA TIMUR 100 Pre-Electrified - - - 124.26532 -9.69127 20591 5304010012 BIJAEPUNU NUSA TENGGARA TIMUR 96 Pre-Electrified - - - 124.25986 -9.69534 20592 5304010012 BIJAEPUNU NUSA TENGGARA TIMUR 108 Pre-Electrified - - - 124.26218 -9.67515 20593 5304010012 BIJAEPUNU NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 124.27431 -9.68035 20594 5304010012 BIJAEPUNU NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 124.26136 -9.68807 20595 5304010016 TUNUA NUSA TENGGARA TIMUR 1 OffGrid Systems 1 703 0.2 124.23462 -9.66798 20596 5304010016 TUNUA NUSA TENGGARA TIMUR 17 Pre-Electrified - - - 124.24782 -9.68608 20597 5304010016 TUNUA NUSA TENGGARA TIMUR 19 Pre-Electrified - - - 124.24890 -9.68755 20598 5304010016 TUNUA NUSA TENGGARA TIMUR 16 Pre-Electrified - - - 124.24812 -9.68796 20599 5304010016 TUNUA NUSA TENGGARA TIMUR 31 Pre-Electrified - - - 124.24520 -9.68817 20600 5304010016 TUNUA NUSA TENGGARA TIMUR 13 Pre-Electrified - - - 124.24981 -9.68848 20601 5304010016 TUNUA NUSA TENGGARA TIMUR 105 Pre-Electrified - - - 124.24809 -9.69016 20602 5304010016 TUNUA NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 124.25275 -9.68277 20603 5304010016 TUNUA NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 124.25290 -9.68684 20604 5304010016 TUNUA NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 124.25181 -9.68760 20605 5304010016 TUNUA NUSA TENGGARA TIMUR 32 Pre-Electrified - - - 124.25028 -9.68833 20606 5304010016 TUNUA NUSA TENGGARA TIMUR 10 Pre-Electrified - - - 124.25016 -9.68094 20607 5304010017 FATUKOTO NUSA TENGGARA TIMUR 10 Pre-Electrified - - - 124.24652 -9.69723 20608 5304010017 FATUKOTO NUSA TENGGARA TIMUR 61 Pre-Electrified - - - 124.24435 -9.70002 20609 5304010017 FATUKOTO NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 124.24567 -9.70031 20610 5304010017 FATUKOTO NUSA TENGGARA TIMUR 20 Pre-Electrified - - - 124.24606 -9.70289 20611 5304010017 FATUKOTO NUSA TENGGARA TIMUR 32 Pre-Electrified - - - 124.24771 -9.70330 20612 5304010017 FATUKOTO NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 124.24839 -9.70584 20613 5304010017 FATUKOTO NUSA TENGGARA TIMUR 73 Pre-Electrified - - - 124.24693 -9.70765 20614 5304011004 FATUMNASI NUSA TENGGARA TIMUR 6 OffGrid Systems 2 1 406 0.3 124.22091 -9.65129 20615 5304011009 KUANOEL NUSA TENGGARA TIMUR 2 OffGrid Systems 1 703 0.2 124.23477 -9.66763 20616 5304012003 TUNE NUSA TENGGARA TIMUR 111 Pre-Electrified - - - 124.32441 -9.62611 20617 5304013001 NOEBESI NUSA TENGGARA TIMUR 112 MiniGrid Systems 27 18 981 4.1 124.09754 -9.68032 20618 5304013001 NOEBESI NUSA TENGGARA TIMUR 49 MiniGrid Systems 12 8 436 1.8 124.06754 -9.65897 20619 5304013002 LILIANA NUSA TENGGARA TIMUR 81 MiniGrid Systems 23 16 169 3.5 124.11073 -9.72009 20620 5304013003 NUNBENA NUSA TENGGARA TIMUR 18 OffGrid Systems 5 3 515 0.8 124.10634 -9.65636 20621 5304013003 NUNBENA NUSA TENGGARA TIMUR 38 MiniGrid Systems 10 7 030 1.5 124.12238 -9.66010 20622 5304020004 TUASENE NUSA TENGGARA TIMUR 151 Pre-Electrified - - - 124.18133 -9.90038 20623 5304020005 BILOTO NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 124.21961 -9.88872 20624 5304020005 BILOTO NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 124.20358 -9.89252 Annex II – Demand forecast results Page 125 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 20625 5304020005 BILOTO NUSA TENGGARA TIMUR 36 Pre-Electrified - - - 124.21952 -9.88569 20626 5304020005 BILOTO NUSA TENGGARA TIMUR 8 OffGrid Systems 2 1 406 0.3 124.16968 -9.84306 20627 5304020005 BILOTO NUSA TENGGARA TIMUR 42 MiniGrid Systems 11 7 733 1.7 124.20694 -9.85921 20628 5304020008 KESETNANA NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 124.24972 -9.86375 20629 5304020008 KESETNANA NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.24565 -9.87433 20630 5304020008 KESETNANA NUSA TENGGARA TIMUR 98 Pre-Electrified - - - 124.24966 -9.85747 20631 5304020008 KESETNANA NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.25000 -9.86033 20632 5304020008 KESETNANA NUSA TENGGARA TIMUR 174 Pre-Electrified - - - 124.24293 -9.86129 20633 5304020008 KESETNANA NUSA TENGGARA TIMUR 203 Pre-Electrified - - - 124.24978 -9.87239 20634 5304020008 KESETNANA NUSA TENGGARA TIMUR 197 Pre-Electrified - - - 124.24779 -9.85725 20635 5304020008 KESETNANA NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.25750 -9.86606 20636 5304020008 KESETNANA NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.25257 -9.87053 20637 5304020008 KESETNANA NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 124.25357 -9.86562 20638 5304020008 KESETNANA NUSA TENGGARA TIMUR 901 Pre-Electrified - - - 124.25096 -9.86799 20639 5304020008 KESETNANA NUSA TENGGARA TIMUR 199 Pre-Electrified - - - 124.25097 -9.86133 20640 5304020008 KESETNANA NUSA TENGGARA TIMUR 592 Pre-Electrified - - - 124.25242 -9.85873 20641 5304020008 KESETNANA NUSA TENGGARA TIMUR 157 Pre-Electrified - - - 124.25592 -9.85731 20642 5304020008 KESETNANA NUSA TENGGARA TIMUR 235 Pre-Electrified - - - 124.25877 -9.86209 20643 5304020008 KESETNANA NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 124.25558 -9.86461 20644 5304020008 KESETNANA NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 124.25798 -9.86444 20645 5304020008 KESETNANA NUSA TENGGARA TIMUR 91 Pre-Electrified - - - 124.25720 -9.85999 20646 5304020008 KESETNANA NUSA TENGGARA TIMUR 87 Pre-Electrified - - - 124.25052 -9.86335 20647 5304020008 KESETNANA NUSA TENGGARA TIMUR 107 Pre-Electrified - - - 124.25838 -9.85915 20648 5304020008 KESETNANA NUSA TENGGARA TIMUR 47 Pre-Electrified - - - 124.25560 -9.85864 20649 5304020008 KESETNANA NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 124.25393 -9.85842 20650 5304020008 KESETNANA NUSA TENGGARA TIMUR 52 Pre-Electrified - - - 124.25402 -9.85723 20651 5304020008 KESETNANA NUSA TENGGARA TIMUR 46 Pre-Electrified - - - 124.25460 -9.85586 20652 5304020008 KESETNANA NUSA TENGGARA TIMUR 2 Pre-Electrified - - - 124.26137 -9.85544 20653 5304020009 OINLASI NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 124.30028 -9.85306 20654 5304020009 OINLASI NUSA TENGGARA TIMUR 26 Pre-Electrified - - - 124.31291 -9.85968 20655 5304020009 OINLASI NUSA TENGGARA TIMUR 1 619 Pre-Electrified - - - 124.30801 -9.86139 20656 5304020009 OINLASI NUSA TENGGARA TIMUR 153 Pre-Electrified - - - 124.30615 -9.85642 20657 5304020009 OINLASI NUSA TENGGARA TIMUR 328 Pre-Electrified - - - 124.30343 -9.85720 20658 5304020009 OINLASI NUSA TENGGARA TIMUR 100 Pre-Electrified - - - 124.30411 -9.85304 20659 5304020009 OINLASI NUSA TENGGARA TIMUR 113 Pre-Electrified - - - 124.29997 -9.85143 20660 5304020009 OINLASI NUSA TENGGARA TIMUR 454 Pre-Electrified - - - 124.29603 -9.84921 20661 5304020009 OINLASI NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 124.29632 -9.84768 20662 5304020009 OINLASI NUSA TENGGARA TIMUR 52 Pre-Electrified - - - 124.30026 -9.84504 20663 5304020009 OINLASI NUSA TENGGARA TIMUR 616 Pre-Electrified - - - 124.30737 -9.84082 20664 5304020009 OINLASI NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 124.30530 -9.84223 20665 5304020009 OINLASI NUSA TENGGARA TIMUR 83 Pre-Electrified - - - 124.30291 -9.84166 20666 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 189 Pre-Electrified - - - 124.28708 -9.82818 20667 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 157 Pre-Electrified - - - 124.29150 -9.83169 20668 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 256 Pre-Electrified - - - 124.28257 -9.83493 20669 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 39 MiniGrid Systems 11 7 733 1.7 124.29541 -9.83055 20670 5304020010 KLANI/NOINBILA NUSA TENGGARA TIMUR 24 Pre-Electrified - - - 124.28619 -9.82249 20671 5304021001 LAOB NUSA TENGGARA TIMUR 6 OffGrid Systems 2 1 406 0.3 124.37022 -9.68578 20672 5304021002 KONBAKI NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 124.43067 -9.69345 20673 5304021002 KONBAKI NUSA TENGGARA TIMUR 182 Pre-Electrified - - - 124.43690 -9.69355 20674 5304021002 KONBAKI NUSA TENGGARA TIMUR 508 Pre-Electrified - - - 124.43235 -9.69423 20675 5304021002 KONBAKI NUSA TENGGARA TIMUR 419 Pre-Electrified - - - 124.43654 -9.69829 20676 5304021002 KONBAKI NUSA TENGGARA TIMUR 69 Pre-Electrified - - - 124.42456 -9.69696 20677 5304021002 KONBAKI NUSA TENGGARA TIMUR 252 Pre-Electrified - - - 124.42991 -9.69771 20678 5304021002 KONBAKI NUSA TENGGARA TIMUR 168 Pre-Electrified - - - 124.42698 -9.69952 20679 5304021003 PUNA NUSA TENGGARA TIMUR 362 Pre-Electrified - - - 124.45973 -9.68459 20680 5304021003 PUNA NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 124.45642 -9.68430 20681 5304021003 PUNA NUSA TENGGARA TIMUR 666 Pre-Electrified - - - 124.47986 -9.68743 20682 5304021003 PUNA NUSA TENGGARA TIMUR 532 Pre-Electrified - - - 124.47885 -9.69875 20683 5304021004 LOLI NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 124.49978 -9.65303 20684 5304021004 LOLI NUSA TENGGARA TIMUR 61 Pre-Electrified - - - 124.49446 -9.65737 20685 5304021004 LOLI NUSA TENGGARA TIMUR 694 Pre-Electrified - - - 124.49650 -9.66854 20686 5304021004 LOLI NUSA TENGGARA TIMUR 101 Pre-Electrified - - - 124.50086 -9.65477 20687 5304021004 LOLI NUSA TENGGARA TIMUR 28 MiniGrid Systems 9 6 327 1.4 124.50074 -9.67118 20688 5304021005 MNESATBUBAK NUSA TENGGARA TIMUR 24 OffGrid Systems 6 4 218 0.9 124.40248 -9.61555 20689 5304021006 BIJELI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.32817 -9.64650 20690 5304021007 USAPIMNASI NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 124.32796 -9.62592 20691 5304021007 USAPIMNASI NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 124.32584 -9.62439 20692 5304021007 USAPIMNASI NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 124.32714 -9.62046 20693 5304021008 FATUMNUTU NUSA TENGGARA TIMUR 163 Pre-Electrified - - - 124.33177 -9.59522 20694 5304021008 FATUMNUTU NUSA TENGGARA TIMUR 666 Pre-Electrified - - - 124.33055 -9.60959 20695 5304021008 FATUMNUTU NUSA TENGGARA TIMUR 247 Pre-Electrified - - - 124.32839 -9.61455 20696 5304021008 FATUMNUTU NUSA TENGGARA TIMUR 130 Pre-Electrified - - - 124.32774 -9.61872 20697 5304021008 FATUMNUTU NUSA TENGGARA TIMUR 10 Pre-Electrified - - - 124.32718 -9.61979 20698 5304021008 FATUMNUTU NUSA TENGGARA TIMUR 133 Pre-Electrified - - - 124.33346 -9.62086 20699 5304021010 BALU NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 124.42461 -9.70269 20700 5304022004 SALBAIT NUSA TENGGARA TIMUR 50 MiniGrid Systems 14 9 842 2.1 124.13049 -9.87731 20701 5304022004 SALBAIT NUSA TENGGARA TIMUR 49 MiniGrid Systems 14 9 842 2.1 124.10176 -9.82009 20702 5304023001 BINAUS NUSA TENGGARA TIMUR 49 MiniGrid Systems 9 6 327 1.4 124.22191 -9.78860 20703 5304023001 BINAUS NUSA TENGGARA TIMUR 82 MiniGrid Systems 15 10 545 2.3 124.26606 -9.78984 20704 5304023001 BINAUS NUSA TENGGARA TIMUR 360 Pre-Electrified - - - 124.27548 -9.78981 20705 5304023001 BINAUS NUSA TENGGARA TIMUR 858 Pre-Electrified - - - 124.27936 -9.79125 20706 5304023001 BINAUS NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 124.27992 -9.78555 20707 5304023002 OELBUBUK NUSA TENGGARA TIMUR 577 Pre-Electrified - - - 124.28184 -9.78479 20708 5304023002 OELBUBUK NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 124.27647 -9.76944 20709 5304023002 OELBUBUK NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 124.26881 -9.75488 Annex II – Demand forecast results Page 126 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 20710 5304023002 OELBUBUK NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 124.27530 -9.76761 20711 5304023002 OELBUBUK NUSA TENGGARA TIMUR 20 Pre-Electrified - - - 124.27130 -9.76656 20712 5304023002 OELBUBUK NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 124.27052 -9.76606 20713 5304023002 OELBUBUK NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 124.26811 -9.76373 20714 5304023002 OELBUBUK NUSA TENGGARA TIMUR 56 Pre-Electrified - - - 124.26475 -9.76542 20715 5304023002 OELBUBUK NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 124.26683 -9.76172 20716 5304023002 OELBUBUK NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 124.26931 -9.75762 20717 5304023002 OELBUBUK NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 124.26500 -9.75745 20718 5304023002 OELBUBUK NUSA TENGGARA TIMUR 261 Pre-Electrified - - - 124.26214 -9.75795 20719 5304023002 OELBUBUK NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 124.26820 -9.75409 20720 5304023003 KUALEU NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.31402 -9.76004 20721 5304023003 KUALEU NUSA TENGGARA TIMUR 28 MiniGrid Systems 7 4 921 1.1 124.32486 -9.74103 20722 5304023005 OELEKAM NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 124.28440 -9.81281 20723 5304023005 OELEKAM NUSA TENGGARA TIMUR 89 Pre-Electrified - - - 124.29098 -9.80885 20724 5304023005 OELEKAM NUSA TENGGARA TIMUR 13 Pre-Electrified - - - 124.28109 -9.80011 20725 5304023006 PIKA NUSA TENGGARA TIMUR 18 OffGrid Systems 5 3 515 0.8 124.35937 -9.78442 20726 5304030001 CENDANA NUSA TENGGARA TIMUR 76 Pre-Electrified - - - 124.24835 -9.87544 20727 5304030001 CENDANA NUSA TENGGARA TIMUR 22 Pre-Electrified - - - 124.24910 -9.87466 20728 5304030001 CENDANA NUSA TENGGARA TIMUR 23 Pre-Electrified - - - 124.26756 -9.87521 20729 5304030001 CENDANA NUSA TENGGARA TIMUR 92 Pre-Electrified - - - 124.26244 -9.87550 20730 5304030001 CENDANA NUSA TENGGARA TIMUR 83 Pre-Electrified - - - 124.25813 -9.87873 20731 5304030001 CENDANA NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 124.26147 -9.88225 20732 5304030001 CENDANA NUSA TENGGARA TIMUR 69 Pre-Electrified - - - 124.25949 -9.88051 20733 5304030001 CENDANA NUSA TENGGARA TIMUR 475 Pre-Electrified - - - 124.26518 -9.87912 20734 5304030001 CENDANA NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 124.25726 -9.86633 20735 5304030001 CENDANA NUSA TENGGARA TIMUR 284 Pre-Electrified - - - 124.25521 -9.87225 20736 5304030001 CENDANA NUSA TENGGARA TIMUR 94 Pre-Electrified - - - 124.26260 -9.87106 20737 5304030001 CENDANA NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.25004 -9.87385 20738 5304030001 CENDANA NUSA TENGGARA TIMUR 1 267 Pre-Electrified - - - 124.26360 -9.86258 20739 5304030001 CENDANA NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 124.26282 -9.87471 20740 5304030001 CENDANA NUSA TENGGARA TIMUR 94 Pre-Electrified - - - 124.26778 -9.87436 20741 5304030001 CENDANA NUSA TENGGARA TIMUR 23 Pre-Electrified - - - 124.26168 -9.86991 20742 5304030001 CENDANA NUSA TENGGARA TIMUR 634 Pre-Electrified - - - 124.25848 -9.86763 20743 5304030001 CENDANA NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.25883 -9.85943 20744 5304030002 SO'E NUSA TENGGARA TIMUR 3 497 Pre-Electrified - - - 124.27240 -9.86620 20745 5304030002 SO'E NUSA TENGGARA TIMUR 207 Pre-Electrified - - - 124.27648 -9.86821 20746 5304030003 OEBESA NUSA TENGGARA TIMUR 179 Pre-Electrified - - - 124.29545 -9.87251 20747 5304030003 OEBESA NUSA TENGGARA TIMUR 2 980 Pre-Electrified - - - 124.28688 -9.86502 20748 5304030003 OEBESA NUSA TENGGARA TIMUR 109 Pre-Electrified - - - 124.29006 -9.86866 20749 5304030004 KOBEKAMUSA NUSA TENGGARA TIMUR 1 472 Pre-Electrified - - - 124.30267 -9.87030 20750 5304030004 KOBEKAMUSA NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 124.30777 -9.86991 20751 5304030005 NUNUMEU NUSA TENGGARA TIMUR 922 Pre-Electrified - - - 124.30337 -9.86647 20752 5304030005 NUNUMEU NUSA TENGGARA TIMUR 3 241 Pre-Electrified - - - 124.29142 -9.86521 20753 5304030005 NUNUMEU NUSA TENGGARA TIMUR 246 Pre-Electrified - - - 124.30562 -9.86353 20754 5304030005 NUNUMEU NUSA TENGGARA TIMUR 204 Pre-Electrified - - - 124.30160 -9.86296 20755 5304030006 OEKEFAN NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 124.30011 -9.85336 20756 5304030006 OEKEFAN NUSA TENGGARA TIMUR 2 300 Pre-Electrified - - - 124.29109 -9.85927 20757 5304030006 OEKEFAN NUSA TENGGARA TIMUR 124 Pre-Electrified - - - 124.29214 -9.85486 20758 5304030006 OEKEFAN NUSA TENGGARA TIMUR 301 Pre-Electrified - - - 124.29907 -9.85526 20759 5304030006 OEKEFAN NUSA TENGGARA TIMUR 231 Pre-Electrified - - - 124.29600 -9.85156 20760 5304030007 TAUBNENO NUSA TENGGARA TIMUR 3 021 Pre-Electrified - - - 124.28558 -9.86133 20761 5304030008 KAMPUNG BARU NUSA TENGGARA TIMUR 1 433 Pre-Electrified - - - 124.27953 -9.86183 20762 5304030009 KARANG SIRI NUSA TENGGARA TIMUR 3 912 Pre-Electrified - - - 124.27586 -9.85774 20763 5304030009 KARANG SIRI NUSA TENGGARA TIMUR 13 Pre-Electrified - - - 124.26452 -9.85931 20764 5304030009 KARANG SIRI NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 124.26969 -9.85792 20765 5304030009 KARANG SIRI NUSA TENGGARA TIMUR 74 Pre-Electrified - - - 124.26215 -9.85529 20766 5304030009 KARANG SIRI NUSA TENGGARA TIMUR 102 Pre-Electrified - - - 124.26525 -9.85508 20767 5304030009 KARANG SIRI NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 124.26712 -9.85453 20768 5304030010 NONOHONIS NUSA TENGGARA TIMUR 1 551 Pre-Electrified - - - 124.28433 -9.85360 20769 5304030010 NONOHONIS NUSA TENGGARA TIMUR 143 Pre-Electrified - - - 124.28573 -9.85057 20770 5304030010 NONOHONIS NUSA TENGGARA TIMUR 2 066 Pre-Electrified - - - 124.28824 -9.84829 20771 5304030010 NONOHONIS NUSA TENGGARA TIMUR 107 Pre-Electrified - - - 124.28058 -9.84773 20772 5304030010 NONOHONIS NUSA TENGGARA TIMUR 55 Pre-Electrified - - - 124.28219 -9.84686 20773 5304030010 NONOHONIS NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 124.28044 -9.84517 20774 5304030010 NONOHONIS NUSA TENGGARA TIMUR 95 Pre-Electrified - - - 124.29709 -9.84107 20775 5304030010 NONOHONIS NUSA TENGGARA TIMUR 486 Pre-Electrified - - - 124.28162 -9.83831 20776 5304030010 NONOHONIS NUSA TENGGARA TIMUR 56 Pre-Electrified - - - 124.28743 -9.83643 20777 5304030011 KOTA BARU NUSA TENGGARA TIMUR 2 062 Pre-Electrified - - - 124.28464 -9.85660 20778 5304030012 KUATAE NUSA TENGGARA TIMUR 316 Pre-Electrified - - - 124.27285 -9.87646 20779 5304030012 KUATAE NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 124.27022 -9.88008 20780 5304030012 KUATAE NUSA TENGGARA TIMUR 29 Pre-Electrified - - - 124.27761 -9.87099 20781 5304030012 KUATAE NUSA TENGGARA TIMUR 19 Pre-Electrified - - - 124.28180 -9.86683 20782 5304030012 KUATAE NUSA TENGGARA TIMUR 607 Pre-Electrified - - - 124.27712 -9.86908 20783 5304030013 NOEMETO NUSA TENGGARA TIMUR 1 102 Pre-Electrified - - - 124.28459 -9.86917 20784 5304030013 NOEMETO NUSA TENGGARA TIMUR 328 Pre-Electrified - - - 124.28747 -9.87178 20785 5304030013 NOEMETO NUSA TENGGARA TIMUR 102 Pre-Electrified - - - 124.28068 -9.87036 20786 5304040008 TUBUHUE NUSA TENGGARA TIMUR 547 Pre-Electrified - - - 124.24591 -9.87947 20787 5304040008 TUBUHUE NUSA TENGGARA TIMUR 19 Pre-Electrified - - - 124.24623 -9.88109 20788 5304040008 TUBUHUE NUSA TENGGARA TIMUR 17 Pre-Electrified - - - 124.23910 -9.88150 20789 5304040008 TUBUHUE NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 124.23934 -9.88273 20790 5304040008 TUBUHUE NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 124.24617 -9.88343 20791 5304040008 TUBUHUE NUSA TENGGARA TIMUR 44 Pre-Electrified - - - 124.24744 -9.88346 20792 5304040008 TUBUHUE NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 124.23818 -9.88405 20793 5304040008 TUBUHUE NUSA TENGGARA TIMUR 220 Pre-Electrified - - - 124.24545 -9.88526 20794 5304040008 TUBUHUE NUSA TENGGARA TIMUR 100 Pre-Electrified - - - 124.23558 -9.88908 Annex II – Demand forecast results Page 127 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 20795 5304040008 TUBUHUE NUSA TENGGARA TIMUR 105 Pre-Electrified - - - 124.24939 -9.87689 20796 5304040008 TUBUHUE NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 124.24564 -9.87473 20797 5304040008 TUBUHUE NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 124.25763 -9.87884 20798 5304040008 TUBUHUE NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 124.26191 -9.88338 20799 5304040008 TUBUHUE NUSA TENGGARA TIMUR 15 Pre-Electrified - - - 124.25015 -9.87718 20800 5304040008 TUBUHUE NUSA TENGGARA TIMUR 252 Pre-Electrified - - - 124.25213 -9.88580 20801 5304040009 HAUMENIBAKI NUSA TENGGARA TIMUR 11 OffGrid Systems 4 2 812 0.6 124.26792 -9.92951 20802 5304040009 HAUMENIBAKI NUSA TENGGARA TIMUR 10 OffGrid Systems 3 2 109 0.5 124.26858 -9.92972 20803 5304040009 HAUMENIBAKI NUSA TENGGARA TIMUR 24 MiniGrid Systems 7 4 921 1.1 124.25770 -9.91939 20804 5304040010 MNELALETE NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 124.31990 -9.87530 20805 5304040010 MNELALETE NUSA TENGGARA TIMUR 1 362 Pre-Electrified - - - 124.30856 -9.87777 20806 5304040010 MNELALETE NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 124.30588 -9.87802 20807 5304040010 MNELALETE NUSA TENGGARA TIMUR 81 Pre-Electrified - - - 124.31832 -9.87897 20808 5304040010 MNELALETE NUSA TENGGARA TIMUR 122 Pre-Electrified - - - 124.31292 -9.87976 20809 5304040010 MNELALETE NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 124.32154 -9.87945 20810 5304040010 MNELALETE NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 124.31761 -9.87979 20811 5304040010 MNELALETE NUSA TENGGARA TIMUR 680 Pre-Electrified - - - 124.32631 -9.88139 20812 5304040010 MNELALETE NUSA TENGGARA TIMUR 195 Pre-Electrified - - - 124.31813 -9.88111 20813 5304040010 MNELALETE NUSA TENGGARA TIMUR 13 Pre-Electrified - - - 124.32390 -9.88412 20814 5304040010 MNELALETE NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.32578 -9.88528 20815 5304040010 MNELALETE NUSA TENGGARA TIMUR 961 Pre-Electrified - - - 124.31197 -9.89501 20816 5304040010 MNELALETE NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 124.31261 -9.89089 20817 5304040010 MNELALETE NUSA TENGGARA TIMUR 58 MiniGrid Systems 12 8 436 1.8 124.30062 -9.89499 20818 5304040010 MNELALETE NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 124.31843 -9.88597 20819 5304040010 MNELALETE NUSA TENGGARA TIMUR 805 Pre-Electrified - - - 124.31096 -9.88586 20820 5304040010 MNELALETE NUSA TENGGARA TIMUR 1 165 Pre-Electrified - - - 124.30645 -9.87447 20821 5304040010 MNELALETE NUSA TENGGARA TIMUR 23 Pre-Electrified - - - 124.31994 -9.87483 20822 5304040010 MNELALETE NUSA TENGGARA TIMUR 127 Pre-Electrified - - - 124.31336 -9.87111 20823 5304040010 MNELALETE NUSA TENGGARA TIMUR 36 Pre-Electrified - - - 124.31498 -9.86924 20824 5304040010 MNELALETE NUSA TENGGARA TIMUR 122 Pre-Electrified - - - 124.31287 -9.86944 20825 5304040011 PUSU NUSA TENGGARA TIMUR 219 Pre-Electrified - - - 124.32657 -9.88755 20826 5304040011 PUSU NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 124.32394 -9.89000 20827 5304040011 PUSU NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 124.31486 -9.89988 20828 5304040011 PUSU NUSA TENGGARA TIMUR 101 Pre-Electrified - - - 124.31007 -9.90502 20829 5304040011 PUSU NUSA TENGGARA TIMUR 179 Pre-Electrified - - - 124.30206 -9.90541 20830 5304040011 PUSU NUSA TENGGARA TIMUR 115 Pre-Electrified - - - 124.31036 -9.91220 20831 5304040011 PUSU NUSA TENGGARA TIMUR 146 Pre-Electrified - - - 124.30109 -9.90217 20832 5304040011 PUSU NUSA TENGGARA TIMUR 225 Pre-Electrified - - - 124.30471 -9.90305 20833 5304040012 NULLE NUSA TENGGARA TIMUR 514 Pre-Electrified - - - 124.33229 -9.87761 20834 5304040012 NULLE NUSA TENGGARA TIMUR 74 Pre-Electrified - - - 124.33772 -9.87231 20835 5304040012 NULLE NUSA TENGGARA TIMUR 218 Pre-Electrified - - - 124.33145 -9.87392 20836 5304040012 NULLE NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 124.33017 -9.87225 20837 5304040012 NULLE NUSA TENGGARA TIMUR 222 Pre-Electrified - - - 124.33572 -9.87286 20838 5304040012 NULLE NUSA TENGGARA TIMUR 61 Pre-Electrified - - - 124.31725 -9.87028 20839 5304040012 NULLE NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.31860 -9.86821 20840 5304040013 TUBLOPO/MEOMETAN NUSA TENGGARA TIMUR 29 Pre-Electrified - - - 124.35597 -9.86619 20841 5304040013 TUBLOPO/MEOMETAN NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 124.33776 -9.87154 20842 5304040013 TUBLOPO/MEOMETAN NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 124.36111 -9.86732 20843 5304040013 TUBLOPO/MEOMETAN NUSA TENGGARA TIMUR 1 032 Pre-Electrified - - - 124.33884 -9.86385 20844 5304040013 TUBLOPO/MEOMETAN NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 124.35485 -9.86734 20845 5304040013 TUBLOPO/MEOMETAN NUSA TENGGARA TIMUR 93 Pre-Electrified - - - 124.35914 -9.86569 20846 5304040013 TUBLOPO/MEOMETAN NUSA TENGGARA TIMUR 210 Pre-Electrified - - - 124.35177 -9.86483 20847 5304040013 TUBLOPO/MEOMETAN NUSA TENGGARA TIMUR 306 Pre-Electrified - - - 124.34843 -9.86538 20848 5304040013 TUBLOPO/MEOMETAN NUSA TENGGARA TIMUR 284 Pre-Electrified - - - 124.36249 -9.86396 20849 5304040013 TUBLOPO/MEOMETAN NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 124.36950 -9.86057 20850 5304040013 TUBLOPO/MEOMETAN NUSA TENGGARA TIMUR 100 Pre-Electrified - - - 124.36574 -9.86107 20851 5304040013 TUBLOPO/MEOMETAN NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 124.36349 -9.85917 20852 5304040014 NUSA NUSA TENGGARA TIMUR 145 Pre-Electrified - - - 124.39628 -9.84840 20853 5304040014 NUSA NUSA TENGGARA TIMUR 246 Pre-Electrified - - - 124.40451 -9.84671 20854 5304040014 NUSA NUSA TENGGARA TIMUR 110 Pre-Electrified - - - 124.40165 -9.84733 20855 5304040014 NUSA NUSA TENGGARA TIMUR 299 Pre-Electrified - - - 124.37916 -9.85008 20856 5304040014 NUSA NUSA TENGGARA TIMUR 103 Pre-Electrified - - - 124.39491 -9.85022 20857 5304040014 NUSA NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 124.38949 -9.85219 20858 5304040014 NUSA NUSA TENGGARA TIMUR 113 Pre-Electrified - - - 124.38731 -9.85338 20859 5304040014 NUSA NUSA TENGGARA TIMUR 53 Pre-Electrified - - - 124.38482 -9.85580 20860 5304040014 NUSA NUSA TENGGARA TIMUR 77 Pre-Electrified - - - 124.38144 -9.85640 20861 5304040014 NUSA NUSA TENGGARA TIMUR 208 Pre-Electrified - - - 124.38610 -9.85403 20862 5304041001 OEBOBO NUSA TENGGARA TIMUR 130 Pre-Electrified - - - 124.12410 -9.97312 20863 5304041001 OEBOBO NUSA TENGGARA TIMUR 53 Pre-Electrified - - - 124.14740 -9.96693 20864 5304041001 OEBOBO NUSA TENGGARA TIMUR 488 Pre-Electrified - - - 124.13336 -9.97242 20865 5304041001 OEBOBO NUSA TENGGARA TIMUR 163 Pre-Electrified - - - 124.13429 -9.97572 20866 5304041001 OEBOBO NUSA TENGGARA TIMUR 206 Pre-Electrified - - - 124.13868 -9.97840 20867 5304041001 OEBOBO NUSA TENGGARA TIMUR 738 Pre-Electrified - - - 124.14670 -9.97876 20868 5304041001 OEBOBO NUSA TENGGARA TIMUR 94 Pre-Electrified - - - 124.14446 -9.98171 20869 5304041001 OEBOBO NUSA TENGGARA TIMUR 222 Pre-Electrified - - - 124.15019 -9.98950 20870 5304041001 OEBOBO NUSA TENGGARA TIMUR 240 Pre-Electrified - - - 124.12699 -9.97315 20871 5304041002 TUPPAN NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 124.12323 -9.97305 20872 5304041002 TUPPAN NUSA TENGGARA TIMUR 57 MiniGrid Systems 17 11 951 2.6 124.15726 -9.92696 20873 5304041002 TUPPAN NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 124.14428 -9.95657 20874 5304041002 TUPPAN NUSA TENGGARA TIMUR 31 Pre-Electrified - - - 124.14174 -9.95789 20875 5304041002 TUPPAN NUSA TENGGARA TIMUR 15 Pre-Electrified - - - 124.13790 -9.95931 20876 5304041003 BOENTUKA NUSA TENGGARA TIMUR 741 Pre-Electrified - - - 124.17252 -9.93409 20877 5304041003 BOENTUKA NUSA TENGGARA TIMUR 212 Pre-Electrified - - - 124.16962 -9.93692 20878 5304041003 BOENTUKA NUSA TENGGARA TIMUR 248 Pre-Electrified - - - 124.16370 -9.94612 20879 5304041003 BOENTUKA NUSA TENGGARA TIMUR 139 Pre-Electrified - - - 124.19026 -9.91330 Annex II – Demand forecast results Page 128 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 20880 5304041003 BOENTUKA NUSA TENGGARA TIMUR 424 Pre-Electrified - - - 124.16020 -9.94992 20881 5304041006 HANE NUSA TENGGARA TIMUR 1 OffGrid Systems 1 703 0.2 124.23444 -9.92269 20882 5304041006 HANE NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.23452 -9.92261 20883 5304041006 HANE NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.21766 -9.92362 20884 5304041006 HANE NUSA TENGGARA TIMUR 2 OffGrid Systems 1 703 0.2 124.21786 -9.92369 20885 5304041007 BENLUTU NUSA TENGGARA TIMUR 313 Pre-Electrified - - - 124.23051 -9.88436 20886 5304041007 BENLUTU NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 124.22646 -9.88887 20887 5304041007 BENLUTU NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 124.23542 -9.88851 20888 5304041007 BENLUTU NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 124.20624 -9.89260 20889 5304041007 BENLUTU NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 124.22534 -9.88666 20890 5304041007 BENLUTU NUSA TENGGARA TIMUR 456 Pre-Electrified - - - 124.22180 -9.89162 20891 5304041007 BENLUTU NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 124.20428 -9.89285 20892 5304041007 BENLUTU NUSA TENGGARA TIMUR 444 Pre-Electrified - - - 124.22568 -9.89193 20893 5304041007 BENLUTU NUSA TENGGARA TIMUR 44 Pre-Electrified - - - 124.21747 -9.89422 20894 5304041007 BENLUTU NUSA TENGGARA TIMUR 287 Pre-Electrified - - - 124.21705 -9.89912 20895 5304041007 BENLUTU NUSA TENGGARA TIMUR 127 Pre-Electrified - - - 124.22036 -9.90173 20896 5304041007 BENLUTU NUSA TENGGARA TIMUR 1 OffGrid Systems 1 703 0.2 124.22199 -9.91286 20897 5304041007 BENLUTU NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.22210 -9.91019 20898 5304042001 LAKAT NUSA TENGGARA TIMUR 464 Pre-Electrified - - - 124.41790 -9.84292 20899 5304042001 LAKAT NUSA TENGGARA TIMUR 74 MiniGrid Systems 19 13 357 2.9 124.40294 -9.86916 20900 5304042002 SUPUL NUSA TENGGARA TIMUR 125 Pre-Electrified - - - 124.45180 -9.83949 20901 5304042002 SUPUL NUSA TENGGARA TIMUR 464 Pre-Electrified - - - 124.44679 -9.84418 20902 5304042002 SUPUL NUSA TENGGARA TIMUR 590 Pre-Electrified - - - 124.45108 -9.84476 20903 5304042002 SUPUL NUSA TENGGARA TIMUR 212 Pre-Electrified - - - 124.43486 -9.84516 20904 5304042002 SUPUL NUSA TENGGARA TIMUR 148 Pre-Electrified - - - 124.45233 -9.83974 20905 5304042003 TETAF NUSA TENGGARA TIMUR 1 041 Pre-Electrified - - - 124.43295 -9.83920 20906 5304042003 TETAF NUSA TENGGARA TIMUR 153 Pre-Electrified - - - 124.41384 -9.83704 20907 5304042003 TETAF NUSA TENGGARA TIMUR 342 Pre-Electrified - - - 124.42163 -9.83772 20908 5304042003 TETAF NUSA TENGGARA TIMUR 152 Pre-Electrified - - - 124.44101 -9.83748 20909 5304042003 TETAF NUSA TENGGARA TIMUR 117 Pre-Electrified - - - 124.41458 -9.84019 20910 5304042003 TETAF NUSA TENGGARA TIMUR 79 Pre-Electrified - - - 124.43258 -9.84361 20911 5304042003 TETAF NUSA TENGGARA TIMUR 441 Pre-Electrified - - - 124.42900 -9.83693 20912 5304042004 ENONEONTES NUSA TENGGARA TIMUR 35 MiniGrid Systems 9 6 327 1.4 124.35226 -9.83564 20913 5304050001 POLLO NUSA TENGGARA TIMUR 338 Pre-Electrified - - - 124.21275 -10.04841 20914 5304050001 POLLO NUSA TENGGARA TIMUR 252 Pre-Electrified - - - 124.21061 -10.03993 20915 5304050001 POLLO NUSA TENGGARA TIMUR 481 Pre-Electrified - - - 124.21627 -10.05746 20916 5304050001 POLLO NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 124.21035 -10.05984 20917 5304050001 POLLO NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 124.22933 -10.06477 20918 5304050001 POLLO NUSA TENGGARA TIMUR 2 494 Pre-Electrified - - - 124.22672 -10.07051 20919 5304050001 POLLO NUSA TENGGARA TIMUR 427 Pre-Electrified - - - 124.21928 -10.07826 20920 5304050002 BENA NUSA TENGGARA TIMUR 423 Pre-Electrified - - - 124.23107 -10.07770 20921 5304050002 BENA NUSA TENGGARA TIMUR 248 Pre-Electrified - - - 124.22729 -10.08283 20922 5304050002 BENA NUSA TENGGARA TIMUR 568 Pre-Electrified - - - 124.23461 -10.08024 20923 5304050002 BENA NUSA TENGGARA TIMUR 34 Pre-Electrified - - - 124.23465 -10.08451 20924 5304050002 BENA NUSA TENGGARA TIMUR 1 199 Pre-Electrified - - - 124.22903 -10.08938 20925 5304050002 BENA NUSA TENGGARA TIMUR 108 Pre-Electrified - - - 124.23687 -10.08668 20926 5304050002 BENA NUSA TENGGARA TIMUR 107 Pre-Electrified - - - 124.23486 -10.10365 20927 5304050002 BENA NUSA TENGGARA TIMUR 144 Pre-Electrified - - - 124.24120 -10.10505 20928 5304050002 BENA NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 124.24213 -10.11439 20929 5304050002 BENA NUSA TENGGARA TIMUR 126 Pre-Electrified - - - 124.26713 -10.13133 20930 5304050002 BENA NUSA TENGGARA TIMUR 221 Pre-Electrified - - - 124.27064 -10.13751 20931 5304050003 OEBELO NUSA TENGGARA TIMUR 1 626 Pre-Electrified - - - 124.31980 -10.15333 20932 5304050003 OEBELO NUSA TENGGARA TIMUR 1 321 Pre-Electrified - - - 124.28485 -10.15032 20933 5304050003 OEBELO NUSA TENGGARA TIMUR 20 Pre-Electrified - - - 124.30084 -10.15348 20934 5304050003 OEBELO NUSA TENGGARA TIMUR 350 Pre-Electrified - - - 124.30739 -10.15544 20935 5304050008 NOEMUKE NUSA TENGGARA TIMUR 39 MiniGrid Systems 10 7 030 1.5 124.35526 -10.06992 20936 5304050009 OEKIU NUSA TENGGARA TIMUR 90 MiniGrid Systems 22 15 466 3.3 124.30500 -10.03924 20937 5304050010 BATNUN NUSA TENGGARA TIMUR 85 Pre-Electrified - - - 124.23327 -10.06951 20938 5304050010 BATNUN NUSA TENGGARA TIMUR 10 OffGrid Systems 3 2 109 0.5 124.26899 -10.06561 20939 5304050011 KIUBAAT NUSA TENGGARA TIMUR 41 MiniGrid Systems 11 7 733 1.7 124.28213 -10.04686 20940 5304050013 MIO NUSA TENGGARA TIMUR 205 Pre-Electrified - - - 124.17195 -9.98832 20941 5304050013 MIO NUSA TENGGARA TIMUR 987 Pre-Electrified - - - 124.15511 -9.99375 20942 5304050019 ENO NETTEN NUSA TENGGARA TIMUR 41 MiniGrid Systems 12 8 436 1.8 124.24301 -9.97468 20943 5304050019 ENO NETTEN NUSA TENGGARA TIMUR 91 MiniGrid Systems 25 17 575 3.8 124.25637 -9.93953 20944 5304051001 OE EKAM NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.25366 -10.02641 20945 5304051002 TEAS NUSA TENGGARA TIMUR 24 MiniGrid Systems 7 4 921 1.1 124.27838 -9.94267 20946 5304051002 TEAS NUSA TENGGARA TIMUR 11 OffGrid Systems 3 2 109 0.5 124.32296 -9.94619 20947 5304051002 TEAS NUSA TENGGARA TIMUR 10 Pre-Electrified - - - 124.30041 -9.91486 20948 5304051003 OEPLIKI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.32829 -10.00318 20949 5304051004 NAIP NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.33423 -10.04514 20950 5304060004 KUSI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.45956 -10.02273 20951 5304060004 KUSI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.46380 -10.02656 20952 5304060004 KUSI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.49167 -10.05590 20953 5304060005 KUANFATU NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.45626 -10.01697 20954 5304060005 KUANFATU NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.44818 -10.02244 20955 5304060005 KUANFATU NUSA TENGGARA TIMUR 1 OffGrid Systems 1 703 0.2 124.43817 -10.02467 20956 5304060006 KELLE NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.40459 -10.05198 20957 5304060007 BASMUTI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.40693 -10.01036 20958 5304060007 BASMUTI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.40786 -10.01031 20959 5304060008 KAKAN NUSA TENGGARA TIMUR 1 OffGrid Systems 1 703 0.2 124.46522 -10.00468 20960 5304061001 TOINEKE NUSA TENGGARA TIMUR 80 MiniGrid Systems 19 13 357 2.9 124.34776 -10.13210 20961 5304061001 TOINEKE NUSA TENGGARA TIMUR 2 692 Pre-Electrified - - - 124.36184 -10.14260 20962 5304061001 TOINEKE NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.36516 -10.14153 20963 5304061001 TOINEKE NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 124.35403 -10.14378 20964 5304061001 TOINEKE NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.33622 -10.15439 Annex II – Demand forecast results Page 129 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 20965 5304061001 TOINEKE NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.35041 -10.09166 20966 5304061002 TUAFANU NUSA TENGGARA TIMUR 194 Pre-Electrified - - - 124.37136 -10.14423 20967 5304061002 TUAFANU NUSA TENGGARA TIMUR 119 Pre-Electrified - - - 124.37307 -10.14711 20968 5304061002 TUAFANU NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 124.42346 -10.13515 20969 5304061002 TUAFANU NUSA TENGGARA TIMUR 77 Pre-Electrified - - - 124.43026 -10.14018 20970 5304061002 TUAFANU NUSA TENGGARA TIMUR 77 Pre-Electrified - - - 124.42009 -10.13998 20971 5304061002 TUAFANU NUSA TENGGARA TIMUR 282 Pre-Electrified - - - 124.37671 -10.14493 20972 5304061002 TUAFANU NUSA TENGGARA TIMUR 708 Pre-Electrified - - - 124.41939 -10.14184 20973 5304061002 TUAFANU NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 124.37675 -10.14123 20974 5304061002 TUAFANU NUSA TENGGARA TIMUR 1 269 Pre-Electrified - - - 124.38702 -10.14643 20975 5304061002 TUAFANU NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 124.37596 -10.14791 20976 5304061003 KIUFATU NUSA TENGGARA TIMUR 306 Pre-Electrified - - - 124.37231 -10.12973 20977 5304061003 KIUFATU NUSA TENGGARA TIMUR 525 Pre-Electrified - - - 124.37252 -10.13769 20978 5304061003 KIUFATU NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 124.38952 -10.12507 20979 5304061003 KIUFATU NUSA TENGGARA TIMUR 164 Pre-Electrified - - - 124.38609 -10.13008 20980 5304061003 KIUFATU NUSA TENGGARA TIMUR 201 Pre-Electrified - - - 124.38423 -10.13245 20981 5304061003 KIUFATU NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.37742 -10.13780 20982 5304061003 KIUFATU NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 124.37668 -10.13972 20983 5304061003 KIUFATU NUSA TENGGARA TIMUR 537 Pre-Electrified - - - 124.40002 -10.10112 20984 5304061003 KIUFATU NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 124.40620 -10.09808 20985 5304061003 KIUFATU NUSA TENGGARA TIMUR 220 Pre-Electrified - - - 124.40174 -10.10071 20986 5304061003 KIUFATU NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.39889 -10.11181 20987 5304061003 KIUFATU NUSA TENGGARA TIMUR 211 Pre-Electrified - - - 124.39628 -10.11450 20988 5304061003 KIUFATU NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.39766 -10.11297 20989 5304061003 KIUFATU NUSA TENGGARA TIMUR 129 Pre-Electrified - - - 124.39320 -10.11885 20990 5304061003 KIUFATU NUSA TENGGARA TIMUR 223 Pre-Electrified - - - 124.39014 -10.12337 20991 5304061004 KUALIN NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.46429 -10.12501 20992 5304061004 KUALIN NUSA TENGGARA TIMUR 977 Pre-Electrified - - - 124.46090 -10.12773 20993 5304061004 KUALIN NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.45034 -10.08860 20994 5304061004 KUALIN NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.43638 -10.09128 20995 5304061004 KUALIN NUSA TENGGARA TIMUR 82 Pre-Electrified - - - 124.46542 -10.12428 20996 5304061005 ONI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.47559 -10.05682 20997 5304061005 ONI NUSA TENGGARA TIMUR 77 MiniGrid Systems 19 13 357 2.9 124.44679 -10.06713 20998 5304061005 ONI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.46518 -10.08143 20999 5304061005 ONI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.46489 -10.08170 21000 5304061005 ONI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.46464 -10.08196 21001 5304061005 ONI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.46385 -10.08230 21002 5304061005 ONI NUSA TENGGARA TIMUR 671 Pre-Electrified - - - 124.48400 -10.11143 21003 5304061005 ONI NUSA TENGGARA TIMUR 276 Pre-Electrified - - - 124.47257 -10.12077 21004 5304061006 TUAPAKAS NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.47539 -10.07201 21005 5304061006 TUAPAKAS NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.47850 -10.07289 21006 5304061006 TUAPAKAS NUSA TENGGARA TIMUR 195 Pre-Electrified - - - 124.49257 -10.10419 21007 5304061006 TUAPAKAS NUSA TENGGARA TIMUR 1 291 Pre-Electrified - - - 124.51378 -10.07902 21008 5304061006 TUAPAKAS NUSA TENGGARA TIMUR 167 Pre-Electrified - - - 124.50389 -10.08400 21009 5304061007 NUNUSUNU NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.35237 -10.09219 21010 5304061007 NUNUSUNU NUSA TENGGARA TIMUR 557 Pre-Electrified - - - 124.39394 -10.09674 21011 5304061007 NUNUSUNU NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.40320 -10.09660 21012 5304070011 MAUNUM NIKI NIKI NUSA TENGGARA TIMUR 6 Pre-Electrified - - - 124.48303 -9.79805 21013 5304070011 MAUNUM NIKI NIKI NUSA TENGGARA TIMUR 254 Pre-Electrified - - - 124.47711 -9.80026 21014 5304070011 MAUNUM NIKI NIKI NUSA TENGGARA TIMUR 315 Pre-Electrified - - - 124.48377 -9.81329 21015 5304070011 MAUNUM NIKI NIKI NUSA TENGGARA TIMUR 595 Pre-Electrified - - - 124.48028 -9.80333 21016 5304070011 MAUNUM NIKI NIKI NUSA TENGGARA TIMUR 536 Pre-Electrified - - - 124.47980 -9.81803 21017 5304070016 TUMU NUSA TENGGARA TIMUR 334 Pre-Electrified - - - 124.47573 -9.83134 21018 5304070016 TUMU NUSA TENGGARA TIMUR 410 Pre-Electrified - - - 124.47438 -9.84087 21019 5304070016 TUMU NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 124.47373 -9.84585 21020 5304070016 TUMU NUSA TENGGARA TIMUR 53 Pre-Electrified - - - 124.47269 -9.82689 21021 5304070016 TUMU NUSA TENGGARA TIMUR 276 Pre-Electrified - - - 124.49034 -9.85699 21022 5304070018 NOBI NOBI NUSA TENGGARA TIMUR 197 Pre-Electrified - - - 124.46428 -9.82827 21023 5304070018 NOBI NOBI NUSA TENGGARA TIMUR 103 Pre-Electrified - - - 124.46412 -9.83238 21024 5304070018 NOBI NOBI NUSA TENGGARA TIMUR 84 Pre-Electrified - - - 124.45846 -9.83547 21025 5304070018 NOBI NOBI NUSA TENGGARA TIMUR 1 258 Pre-Electrified - - - 124.46162 -9.83422 21026 5304070018 NOBI NOBI NUSA TENGGARA TIMUR 746 Pre-Electrified - - - 124.45370 -9.83632 21027 5304070018 NOBI NOBI NUSA TENGGARA TIMUR 149 Pre-Electrified - - - 124.45041 -9.82876 21028 5304070018 NOBI NOBI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.45353 -9.84459 21029 5304070018 NOBI NOBI NUSA TENGGARA TIMUR 223 Pre-Electrified - - - 124.45323 -9.83840 21030 5304070018 NOBI NOBI NUSA TENGGARA TIMUR 606 Pre-Electrified - - - 124.45662 -9.83635 21031 5304070019 NIKI NIKI NUSA TENGGARA TIMUR 55 Pre-Electrified - - - 124.47867 -9.81409 21032 5304070019 NIKI NIKI NUSA TENGGARA TIMUR 1 883 Pre-Electrified - - - 124.47613 -9.81370 21033 5304070019 NIKI NIKI NUSA TENGGARA TIMUR 118 Pre-Electrified - - - 124.47480 -9.82175 21034 5304070019 NIKI NIKI NUSA TENGGARA TIMUR 768 Pre-Electrified - - - 124.47042 -9.82419 21035 5304070019 NIKI NIKI NUSA TENGGARA TIMUR 120 Pre-Electrified - - - 124.47215 -9.81206 21036 5304070019 NIKI NIKI NUSA TENGGARA TIMUR 115 Pre-Electrified - - - 124.47208 -9.82606 21037 5304070019 NIKI NIKI NUSA TENGGARA TIMUR 9 Pre-Electrified - - - 124.47850 -9.81774 21038 5304070020 BONE NUSA TENGGARA TIMUR 304 Pre-Electrified - - - 124.46064 -9.79662 21039 5304070020 BONE NUSA TENGGARA TIMUR 408 Pre-Electrified - - - 124.46310 -9.79912 21040 5304071001 KOLBANO NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 124.53590 -10.01380 21041 5304071001 KOLBANO NUSA TENGGARA TIMUR 134 Pre-Electrified - - - 124.53928 -10.01517 21042 5304071001 KOLBANO NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.53858 -10.01740 21043 5304071001 KOLBANO NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 124.53926 -10.01862 21044 5304071001 KOLBANO NUSA TENGGARA TIMUR 317 Pre-Electrified - - - 124.52961 -10.02869 21045 5304071001 KOLBANO NUSA TENGGARA TIMUR 1 858 Pre-Electrified - - - 124.52119 -10.03482 21046 5304071001 KOLBANO NUSA TENGGARA TIMUR 141 Pre-Electrified - - - 124.52513 -10.03295 21047 5304071001 KOLBANO NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 124.53033 -10.03345 21048 5304071002 NOESIU NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 124.52234 -10.06008 21049 5304071003 PENE SELATAN NUSA TENGGARA TIMUR 1 405 Pre-Electrified - - - 124.51811 -10.01648 Annex II – Demand forecast results Page 130 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 21050 5304071007 SEI NUSA TENGGARA TIMUR 6 OffGrid Systems 2 1 406 0.3 124.49982 -10.00581 21051 5304071007 SEI NUSA TENGGARA TIMUR 418 Pre-Electrified - - - 124.52129 -10.00121 21052 5304071007 SEI NUSA TENGGARA TIMUR 184 Pre-Electrified - - - 124.50894 -10.00503 21053 5304071007 SEI NUSA TENGGARA TIMUR 189 Pre-Electrified - - - 124.51318 -10.00956 21054 5304071007 SEI NUSA TENGGARA TIMUR 127 Pre-Electrified - - - 124.51107 -9.98770 21055 5304071007 SEI NUSA TENGGARA TIMUR 123 Pre-Electrified - - - 124.51412 -9.99071 21056 5304071007 SEI NUSA TENGGARA TIMUR 146 Pre-Electrified - - - 124.51587 -9.99353 21057 5304071007 SEI NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 124.51200 -9.99485 21058 5304071007 SEI NUSA TENGGARA TIMUR 147 Pre-Electrified - - - 124.52056 -9.99943 21059 5304071008 NUNUNAMAT NUSA TENGGARA TIMUR 119 Pre-Electrified - - - 124.53471 -10.01301 21060 5304071008 NUNUNAMAT NUSA TENGGARA TIMUR 283 Pre-Electrified - - - 124.53916 -10.01447 21061 5304071008 NUNUNAMAT NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.51522 -9.99175 21062 5304071008 NUNUNAMAT NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 124.51652 -9.99319 21063 5304071009 PANA NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 124.50212 -9.98114 21064 5304072001 NEKE NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.48237 -9.75778 21065 5304072001 NEKE NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.48193 -9.75940 21066 5304072001 NEKE NUSA TENGGARA TIMUR 253 Pre-Electrified - - - 124.47906 -9.72710 21067 5304072001 NEKE NUSA TENGGARA TIMUR 518 Pre-Electrified - - - 124.48409 -9.74100 21068 5304072001 NEKE NUSA TENGGARA TIMUR 94 Pre-Electrified - - - 124.47782 -9.73930 21069 5304072001 NEKE NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 124.48942 -9.73949 21070 5304072003 NOE NONI NUSA TENGGARA TIMUR 32 MiniGrid Systems 9 6 327 1.4 124.34834 -9.75218 21071 5304072003 NOE NONI NUSA TENGGARA TIMUR 2 OffGrid Systems 1 703 0.2 124.37485 -9.77517 21072 5304072003 NOE NONI NUSA TENGGARA TIMUR 47 MiniGrid Systems 13 9 139 2.0 124.33964 -9.75894 21073 5304072003 NOE NONI NUSA TENGGARA TIMUR 9 OffGrid Systems 3 2 109 0.5 124.35131 -9.75049 21074 5304072003 NOE NONI NUSA TENGGARA TIMUR 10 OffGrid Systems 3 2 109 0.5 124.36344 -9.72611 21075 5304072003 NOE NONI NUSA TENGGARA TIMUR 2 OffGrid Systems 1 703 0.2 124.35170 -9.74991 21076 5304072005 NIKI NIKI UN NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 124.48254 -9.75820 21077 5304072005 NIKI NIKI UN NUSA TENGGARA TIMUR 84 Pre-Electrified - - - 124.48132 -9.76084 21078 5304072005 NIKI NIKI UN NUSA TENGGARA TIMUR 309 Pre-Electrified - - - 124.48027 -9.76358 21079 5304072005 NIKI NIKI UN NUSA TENGGARA TIMUR 237 Pre-Electrified - - - 124.47998 -9.76683 21080 5304072005 NIKI NIKI UN NUSA TENGGARA TIMUR 98 Pre-Electrified - - - 124.47721 -9.76963 21081 5304072005 NIKI NIKI UN NUSA TENGGARA TIMUR 116 Pre-Electrified - - - 124.47520 -9.76939 21082 5304072005 NIKI NIKI UN NUSA TENGGARA TIMUR 145 Pre-Electrified - - - 124.47449 -9.78290 21083 5304072005 NIKI NIKI UN NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 124.47443 -9.78533 21084 5304072006 OENINO NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 124.46386 -9.72629 21085 5304072006 OENINO NUSA TENGGARA TIMUR 91 Pre-Electrified - - - 124.45637 -9.72941 21086 5304080005 OELET NUSA TENGGARA TIMUR 141 Pre-Electrified - - - 124.54252 -9.69183 21087 5304080006 OE EKAM NUSA TENGGARA TIMUR 71 Pre-Electrified - - - 124.55575 -9.69145 21088 5304080006 OE EKAM NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 124.55523 -9.69470 21089 5304080006 OE EKAM NUSA TENGGARA TIMUR 388 Pre-Electrified - - - 124.55654 -9.69608 21090 5304080006 OE EKAM NUSA TENGGARA TIMUR 333 Pre-Electrified - - - 124.57005 -9.70008 21091 5304080006 OE EKAM NUSA TENGGARA TIMUR 710 Pre-Electrified - - - 124.57884 -9.70715 21092 5304080006 OE EKAM NUSA TENGGARA TIMUR 957 Pre-Electrified - - - 124.58912 -9.70878 21093 5304080006 OE EKAM NUSA TENGGARA TIMUR 30 MiniGrid Systems 7 4 921 1.1 124.58025 -9.72187 21094 5304080007 PISAN NUSA TENGGARA TIMUR 20 OffGrid Systems 6 4 218 0.9 124.60420 -9.75357 21095 5304080007 PISAN NUSA TENGGARA TIMUR 8 Pre-Electrified - - - 124.60587 -9.72333 21096 5304080008 MNELAANEN NUSA TENGGARA TIMUR 719 Pre-Electrified - - - 124.60580 -9.71024 21097 5304080008 MNELAANEN NUSA TENGGARA TIMUR 74 Pre-Electrified - - - 124.62089 -9.71048 21098 5304080008 MNELAANEN NUSA TENGGARA TIMUR 277 Pre-Electrified - - - 124.59169 -9.71561 21099 5304080008 MNELAANEN NUSA TENGGARA TIMUR 77 Pre-Electrified - - - 124.62266 -9.71613 21100 5304080008 MNELAANEN NUSA TENGGARA TIMUR 93 Pre-Electrified - - - 124.60473 -9.71748 21101 5304080008 MNELAANEN NUSA TENGGARA TIMUR 168 Pre-Electrified - - - 124.59705 -9.71884 21102 5304080008 MNELAANEN NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 124.59987 -9.71703 21103 5304080008 MNELAANEN NUSA TENGGARA TIMUR 529 Pre-Electrified - - - 124.61125 -9.71907 21104 5304080009 TELUK NUSA TENGGARA TIMUR 124 Pre-Electrified - - - 124.64815 -9.71303 21105 5304080009 TELUK NUSA TENGGARA TIMUR 194 Pre-Electrified - - - 124.63971 -9.71504 21106 5304080009 TELUK NUSA TENGGARA TIMUR 263 Pre-Electrified - - - 124.63790 -9.72149 21107 5304080009 TELUK NUSA TENGGARA TIMUR 161 Pre-Electrified - - - 124.64289 -9.72306 21108 5304080009 TELUK NUSA TENGGARA TIMUR 124 Pre-Electrified - - - 124.63383 -9.72682 21109 5304080016 SINI NUSA TENGGARA TIMUR 1 OffGrid Systems 1 703 0.2 124.52159 -9.75004 21110 5304080018 TLIU NUSA TENGGARA TIMUR 117 Pre-Electrified - - - 124.54837 -9.70098 21111 5304082001 FATUKOPA NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.58317 -9.64699 21112 5304082001 FATUKOPA NUSA TENGGARA TIMUR 3 OffGrid Systems 1 703 0.2 124.58922 -9.65275 21113 5304082003 TAEBONE NUSA TENGGARA TIMUR 3 OffGrid Systems 1 703 0.2 124.62375 -9.68895 21114 5304082003 TAEBONE NUSA TENGGARA TIMUR 45 MiniGrid Systems 14 9 842 2.1 124.63011 -9.63543 21115 5304082003 TAEBONE NUSA TENGGARA TIMUR 6 OffGrid Systems 2 1 406 0.3 124.63765 -9.64792 21116 5304082003 TAEBONE NUSA TENGGARA TIMUR 9 OffGrid Systems 3 2 109 0.5 124.63887 -9.64950 21117 5304082003 TAEBONE NUSA TENGGARA TIMUR 8 OffGrid Systems 3 2 109 0.5 124.62599 -9.64992 21118 5304082004 NUNFUTU NUSA TENGGARA TIMUR 2 OffGrid Systems 1 703 0.2 124.63016 -9.63423 21119 5304082004 NUNFUTU NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.62497 -9.61103 21120 5304082004 NUNFUTU NUSA TENGGARA TIMUR 2 OffGrid Systems 1 703 0.2 124.62510 -9.61281 21121 5304082004 NUNFUTU NUSA TENGGARA TIMUR 69 MiniGrid Systems 15 10 545 2.3 124.63191 -9.62418 21122 5304090007 TESI AYOFANU NUSA TENGGARA TIMUR 850 Pre-Electrified - - - 124.59002 -9.86929 21123 5304090011 OENAI NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 124.49834 -9.85615 21124 5304090011 OENAI NUSA TENGGARA TIMUR 170 Pre-Electrified - - - 124.51634 -9.85015 21125 5304090011 OENAI NUSA TENGGARA TIMUR 368 Pre-Electrified - - - 124.51952 -9.84963 21126 5304090011 OENAI NUSA TENGGARA TIMUR 404 Pre-Electrified - - - 124.51444 -9.85126 21127 5304090011 OENAI NUSA TENGGARA TIMUR 171 Pre-Electrified - - - 124.52369 -9.85167 21128 5304090011 OENAI NUSA TENGGARA TIMUR 89 Pre-Electrified - - - 124.51104 -9.85266 21129 5304090011 OENAI NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 124.50786 -9.85498 21130 5304090011 OENAI NUSA TENGGARA TIMUR 187 Pre-Electrified - - - 124.50579 -9.85533 21131 5304090011 OENAI NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 124.50254 -9.85537 21132 5304090011 OENAI NUSA TENGGARA TIMUR 975 Pre-Electrified - - - 124.52712 -9.85398 21133 5304090012 OINLASI NUSA TENGGARA TIMUR 83 MiniGrid Systems 14 9 842 2.1 124.56765 -9.84095 21134 5304090012 OINLASI NUSA TENGGARA TIMUR 469 Pre-Electrified - - - 124.56969 -9.84753 Annex II – Demand forecast results Page 131 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 21135 5304090012 OINLASI NUSA TENGGARA TIMUR 1 227 Pre-Electrified - - - 124.56967 -9.85397 21136 5304090012 OINLASI NUSA TENGGARA TIMUR 178 Pre-Electrified - - - 124.57167 -9.85801 21137 5304090012 OINLASI NUSA TENGGARA TIMUR 1 145 Pre-Electrified - - - 124.56034 -9.85488 21138 5304090013 NAPI NUSA TENGGARA TIMUR 49 MiniGrid Systems 14 9 842 2.1 124.54960 -9.83814 21139 5304090013 NAPI NUSA TENGGARA TIMUR 1 059 Pre-Electrified - - - 124.54886 -9.84753 21140 5304090013 NAPI NUSA TENGGARA TIMUR 64 Pre-Electrified - - - 124.54427 -9.85218 21141 5304090013 NAPI NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 124.54135 -9.85231 21142 5304090013 NAPI NUSA TENGGARA TIMUR 117 Pre-Electrified - - - 124.55308 -9.85122 21143 5304090015 PILI NUSA TENGGARA TIMUR 84 MiniGrid Systems 22 15 466 3.3 124.48985 -9.78084 21144 5304091001 KOT'OLIN NUSA TENGGARA TIMUR 3 OffGrid Systems 1 703 0.2 124.59833 -9.95147 21145 5304100001 OINLASI NUSA TENGGARA TIMUR 1 927 Pre-Electrified - - - 124.57366 -9.85246 21146 5304100001 OINLASI NUSA TENGGARA TIMUR 237 Pre-Electrified - - - 124.59026 -9.84872 21147 5304100001 OINLASI NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 124.58602 -9.85629 21148 5304100001 OINLASI NUSA TENGGARA TIMUR 104 Pre-Electrified - - - 124.58721 -9.85089 21149 5304100002 KOKOI NUSA TENGGARA TIMUR 13 Pre-Electrified - - - 124.58647 -9.85682 21150 5304100002 KOKOI NUSA TENGGARA TIMUR 741 Pre-Electrified - - - 124.60333 -9.86024 21151 5304100002 KOKOI NUSA TENGGARA TIMUR 61 Pre-Electrified - - - 124.59601 -9.86015 21152 5304100002 KOKOI NUSA TENGGARA TIMUR 170 Pre-Electrified - - - 124.59380 -9.86212 21153 5304100004 NUNLEU NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.63586 -9.87046 21154 5304100012 KUALEU NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.63935 -9.84298 21155 5304100013 FENUN NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.63955 -9.84062 21156 5304100014 ANIN NUSA TENGGARA TIMUR 641 Pre-Electrified - - - 124.58491 -9.84595 21157 5304100032 FAE NUSA TENGGARA TIMUR 936 Pre-Electrified - - - 124.60246 -9.85068 21158 5304101005 BOKING NUSA TENGGARA TIMUR 1 393 Pre-Electrified - - - 124.76326 -9.83692 21159 5304101005 BOKING NUSA TENGGARA TIMUR 437 Pre-Electrified - - - 124.75564 -9.84096 21160 5304101012 MEUSIN NUSA TENGGARA TIMUR 2 OffGrid Systems 1 703 0.2 124.74996 -9.82356 21161 5304101012 MEUSIN NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 124.77194 -9.81152 21162 5304101012 MEUSIN NUSA TENGGARA TIMUR 1 538 Pre-Electrified - - - 124.76733 -9.82816 21163 5304101012 MEUSIN NUSA TENGGARA TIMUR 805 Pre-Electrified - - - 124.77135 -9.83243 21164 5304102003 SAHAN NUSA TENGGARA TIMUR 89 MiniGrid Systems 26 18 278 3.9 124.69613 -9.91222 21165 5304102005 NUNKOLO NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 124.71552 -9.87745 21166 5304102005 NUNKOLO NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 124.72442 -9.87793 21167 5304102005 NUNKOLO NUSA TENGGARA TIMUR 122 Pre-Electrified - - - 124.72145 -9.88771 21168 5304102005 NUNKOLO NUSA TENGGARA TIMUR 500 Pre-Electrified - - - 124.73755 -9.88195 21169 5304102005 NUNKOLO NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 124.71900 -9.88623 21170 5304102005 NUNKOLO NUSA TENGGARA TIMUR 104 Pre-Electrified - - - 124.72126 -9.86807 21171 5304102005 NUNKOLO NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 124.72186 -9.86817 21172 5304102005 NUNKOLO NUSA TENGGARA TIMUR 350 Pre-Electrified - - - 124.71722 -9.87101 21173 5304102005 NUNKOLO NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 124.71259 -9.87189 21174 5304102005 NUNKOLO NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 124.71489 -9.87293 21175 5304102006 HOINENO NUSA TENGGARA TIMUR 265 Pre-Electrified - - - 124.70733 -9.86541 21176 5304102006 HOINENO NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 124.70628 -9.86752 21177 5304102006 HOINENO NUSA TENGGARA TIMUR 328 Pre-Electrified - - - 124.70777 -9.86822 21178 5304102006 HOINENO NUSA TENGGARA TIMUR 704 Pre-Electrified - - - 124.70266 -9.86888 21179 5304102006 HOINENO NUSA TENGGARA TIMUR 47 Pre-Electrified - - - 124.69929 -9.86835 21180 5304102006 HOINENO NUSA TENGGARA TIMUR 90 Pre-Electrified - - - 124.69227 -9.87037 21181 5304110004 LILO NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 124.71134 -9.68280 21182 5304110004 LILO NUSA TENGGARA TIMUR 305 Pre-Electrified - - - 124.70726 -9.68639 21183 5304110004 LILO NUSA TENGGARA TIMUR 359 Pre-Electrified - - - 124.70663 -9.69107 21184 5304110004 LILO NUSA TENGGARA TIMUR 2 386 Pre-Electrified - - - 124.70785 -9.69624 21185 5304110007 NASI NUSA TENGGARA TIMUR 446 Pre-Electrified - - - 124.66901 -9.71336 21186 5304110007 NASI NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 124.66201 -9.71297 21187 5304110007 NASI NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 124.65500 -9.71303 21188 5304110007 NASI NUSA TENGGARA TIMUR 143 Pre-Electrified - - - 124.65754 -9.71361 21189 5304110007 NASI NUSA TENGGARA TIMUR 223 Pre-Electrified - - - 124.66617 -9.71603 21190 5304110007 NASI NUSA TENGGARA TIMUR 123 Pre-Electrified - - - 124.66030 -9.71406 21191 5304110007 NASI NUSA TENGGARA TIMUR 20 Pre-Electrified - - - 124.66879 -9.71581 21192 5304110007 NASI NUSA TENGGARA TIMUR 56 Pre-Electrified - - - 124.65114 -9.71907 21193 5304110007 NASI NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 124.64980 -9.72229 21194 5304110007 NASI NUSA TENGGARA TIMUR 182 Pre-Electrified - - - 124.67211 -9.71729 21195 5304110008 SNOK NUSA TENGGARA TIMUR 104 Pre-Electrified - - - 124.68472 -9.68983 21196 5304110008 SNOK NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 124.68455 -9.69373 21197 5304110008 SNOK NUSA TENGGARA TIMUR 198 Pre-Electrified - - - 124.69855 -9.69764 21198 5304110008 SNOK NUSA TENGGARA TIMUR 19 Pre-Electrified - - - 124.69432 -9.69740 21199 5304110008 SNOK NUSA TENGGARA TIMUR 1 008 Pre-Electrified - - - 124.67493 -9.70415 21200 5304110008 SNOK NUSA TENGGARA TIMUR 255 Pre-Electrified - - - 124.70247 -9.69739 21201 5304110008 SNOK NUSA TENGGARA TIMUR 52 Pre-Electrified - - - 124.69332 -9.69834 21202 5304110008 SNOK NUSA TENGGARA TIMUR 155 Pre-Electrified - - - 124.68590 -9.69650 21203 5304110008 SNOK NUSA TENGGARA TIMUR 161 Pre-Electrified - - - 124.68390 -9.69737 21204 5304110008 SNOK NUSA TENGGARA TIMUR 115 Pre-Electrified - - - 124.68072 -9.69700 21205 5304110009 TUMU NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 124.70633 -9.68877 21206 5304110009 TUMU NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 124.70511 -9.68929 21207 5304110009 TUMU NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 124.70628 -9.69041 21208 5304110009 TUMU NUSA TENGGARA TIMUR 101 Pre-Electrified - - - 124.69840 -9.69024 21209 5304110010 FATUONI NUSA TENGGARA TIMUR 166 Pre-Electrified - - - 124.70717 -9.67742 21210 5304110010 FATUONI NUSA TENGGARA TIMUR 2 Pre-Electrified - - - 124.70695 -9.68598 21211 5304110010 FATUONI NUSA TENGGARA TIMUR 107 Pre-Electrified - - - 124.70803 -9.67964 21212 5304110011 SONO NUSA TENGGARA TIMUR 1 134 Pre-Electrified - - - 124.74357 -9.67825 21213 5304110011 SONO NUSA TENGGARA TIMUR 194 Pre-Electrified - - - 124.74859 -9.67857 21214 5304110011 SONO NUSA TENGGARA TIMUR 908 Pre-Electrified - - - 124.72858 -9.67777 21215 5304110011 SONO NUSA TENGGARA TIMUR 342 Pre-Electrified - - - 124.72023 -9.67859 21216 5304110011 SONO NUSA TENGGARA TIMUR 24 Pre-Electrified - - - 124.71563 -9.68016 21217 5304110011 SONO NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 124.71354 -9.68151 21218 5304110011 SONO NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 124.71697 -9.67981 21219 5304111002 SKINU NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 124.78537 -9.74171 Annex II – Demand forecast results Page 132 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 21220 5304111003 TOIANAS NUSA TENGGARA TIMUR 2 OffGrid Systems 1 703 0.2 124.77168 -9.70300 21221 5304111003 TOIANAS NUSA TENGGARA TIMUR 349 Pre-Electrified - - - 124.80278 -9.70562 21222 5304111003 TOIANAS NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 124.80641 -9.71874 21223 5304111003 TOIANAS NUSA TENGGARA TIMUR 47 Pre-Electrified - - - 124.80491 -9.71872 21224 5304111003 TOIANAS NUSA TENGGARA TIMUR 847 Pre-Electrified - - - 124.79205 -9.72309 21225 5304111003 TOIANAS NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 124.78622 -9.73175 21226 5304111003 TOIANAS NUSA TENGGARA TIMUR 12 Pre-Electrified - - - 124.78254 -9.73394 21227 5304111003 TOIANAS NUSA TENGGARA TIMUR 192 Pre-Electrified - - - 124.78688 -9.73465 21228 5304111003 TOIANAS NUSA TENGGARA TIMUR 326 Pre-Electrified - - - 124.80044 -9.71303 21229 5304111003 TOIANAS NUSA TENGGARA TIMUR 16 Pre-Electrified - - - 124.80670 -9.71998 21230 5304111004 SAMBET NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.74967 -9.67977 21231 5304111004 SAMBET NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 124.75766 -9.66592 21232 5304111004 SAMBET NUSA TENGGARA TIMUR 36 Pre-Electrified - - - 124.75618 -9.66799 21233 5304111004 SAMBET NUSA TENGGARA TIMUR 9 Pre-Electrified - - - 124.75652 -9.66847 21234 5304111004 SAMBET NUSA TENGGARA TIMUR 145 Pre-Electrified - - - 124.75490 -9.67452 21235 5304111004 SAMBET NUSA TENGGARA TIMUR 242 Pre-Electrified - - - 124.75426 -9.67900 21236 5304111005 BOKONG NUSA TENGGARA TIMUR 353 Pre-Electrified - - - 124.76942 -9.65123 21237 5304111005 BOKONG NUSA TENGGARA TIMUR 96 Pre-Electrified - - - 124.77080 -9.65240 21238 5304111005 BOKONG NUSA TENGGARA TIMUR 321 Pre-Electrified - - - 124.76945 -9.65533 21239 5304111005 BOKONG NUSA TENGGARA TIMUR 132 Pre-Electrified - - - 124.76481 -9.65673 21240 5304111005 BOKONG NUSA TENGGARA TIMUR 172 Pre-Electrified - - - 124.77286 -9.66062 21241 5304111005 BOKONG NUSA TENGGARA TIMUR 1 251 Pre-Electrified - - - 124.76166 -9.66022 21242 5304111005 BOKONG NUSA TENGGARA TIMUR 818 Pre-Electrified - - - 124.77409 -9.66343 21243 5304111005 BOKONG NUSA TENGGARA TIMUR 7 Pre-Electrified - - - 124.75804 -9.66528 21244 5304111006 TUATAUM NUSA TENGGARA TIMUR 151 Pre-Electrified - - - 124.79477 -9.66230 21245 5304111006 TUATAUM NUSA TENGGARA TIMUR 69 Pre-Electrified - - - 124.77745 -9.66513 21246 5304111006 TUATAUM NUSA TENGGARA TIMUR 53 Pre-Electrified - - - 124.78035 -9.66565 21247 5304111006 TUATAUM NUSA TENGGARA TIMUR 184 Pre-Electrified - - - 124.78969 -9.66767 21248 5304111006 TUATAUM NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 124.78477 -9.66885 21249 5304111006 TUATAUM NUSA TENGGARA TIMUR 19 Pre-Electrified - - - 124.78103 -9.67021 21250 5304111006 TUATAUM NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 124.77991 -9.67198 21251 5304111006 TUATAUM NUSA TENGGARA TIMUR 133 Pre-Electrified - - - 124.79739 -9.67224 21252 5304111006 TUATAUM NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 124.79423 -9.67342 21253 5304111006 TUATAUM NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 124.80382 -9.67327 21254 5304111006 TUATAUM NUSA TENGGARA TIMUR 196 Pre-Electrified - - - 124.80575 -9.67640 21255 5304111006 TUATAUM NUSA TENGGARA TIMUR 77 Pre-Electrified - - - 124.81374 -9.67558 21256 5304111006 TUATAUM NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 124.80810 -9.68061 21257 5304111006 TUATAUM NUSA TENGGARA TIMUR 84 Pre-Electrified - - - 124.80898 -9.68220 21258 5304111006 TUATAUM NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 124.80763 -9.68477 21259 5304111006 TUATAUM NUSA TENGGARA TIMUR 16 Pre-Electrified - - - 124.80749 -9.68731 21260 5304111006 TUATAUM NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 124.80782 -9.69021 21261 5304111006 TUATAUM NUSA TENGGARA TIMUR 112 Pre-Electrified - - - 124.80694 -9.69610 21262 5304111006 TUATAUM NUSA TENGGARA TIMUR 7 OffGrid Systems 2 1 406 0.3 124.79300 -9.65871 21263 5304111006 TUATAUM NUSA TENGGARA TIMUR 53 Pre-Electrified - - - 124.80244 -9.67528 21264 5305010001 NOEPESU NUSA TENGGARA TIMUR 1 110 Pre-Electrified - - - 124.29108 -9.55573 21265 5305010001 NOEPESU NUSA TENGGARA TIMUR 52 Pre-Electrified - - - 124.29039 -9.56160 21266 5305010002 FATUNENO NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 124.29315 -9.54796 21267 5305010002 FATUNENO NUSA TENGGARA TIMUR 1 248 Pre-Electrified - - - 124.29530 -9.55195 21268 5305010002 FATUNENO NUSA TENGGARA TIMUR 383 Pre-Electrified - - - 124.30039 -9.55352 21269 5305010003 EBAN NUSA TENGGARA TIMUR 2 120 Pre-Electrified - - - 124.31748 -9.55829 21270 5305010003 EBAN NUSA TENGGARA TIMUR 103 Pre-Electrified - - - 124.32263 -9.54760 21271 5305010003 EBAN NUSA TENGGARA TIMUR 218 Pre-Electrified - - - 124.32488 -9.55441 21272 5305010003 EBAN NUSA TENGGARA TIMUR 138 Pre-Electrified - - - 124.30382 -9.56300 21273 5305010004 SALLU NUSA TENGGARA TIMUR 29 MiniGrid Systems 8 5 624 1.2 124.34644 -9.54402 21274 5305010004 SALLU NUSA TENGGARA TIMUR 1 691 Pre-Electrified - - - 124.33117 -9.55524 21275 5305010004 SALLU NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.32612 -9.55521 21276 5305010004 SALLU NUSA TENGGARA TIMUR 377 Pre-Electrified - - - 124.32732 -9.56836 21277 5305010005 SUANAE NUSA TENGGARA TIMUR 811 Pre-Electrified - - - 124.33384 -9.56507 21278 5305010005 SUANAE NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 124.32918 -9.56840 21279 5305010006 LEMON NUSA TENGGARA TIMUR 386 Pre-Electrified - - - 124.32577 -9.57097 21280 5305010006 LEMON NUSA TENGGARA TIMUR 166 Pre-Electrified - - - 124.32519 -9.58271 21281 5305010007 FATUNISUAN NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 124.35783 -9.56706 21282 5305010007 FATUNISUAN NUSA TENGGARA TIMUR 251 Pre-Electrified - - - 124.35508 -9.56867 21283 5305010007 FATUNISUAN NUSA TENGGARA TIMUR 988 Pre-Electrified - - - 124.35186 -9.57484 21284 5305010007 FATUNISUAN NUSA TENGGARA TIMUR 100 Pre-Electrified - - - 124.35613 -9.58032 21285 5305010008 HAULASI NUSA TENGGARA TIMUR 166 Pre-Electrified - - - 124.38192 -9.55437 21286 5305010008 HAULASI NUSA TENGGARA TIMUR 474 Pre-Electrified - - - 124.38517 -9.55403 21287 5305010008 HAULASI NUSA TENGGARA TIMUR 128 Pre-Electrified - - - 124.38491 -9.55592 21288 5305010008 HAULASI NUSA TENGGARA TIMUR 108 Pre-Electrified - - - 124.38059 -9.55655 21289 5305010021 FATUTASU NUSA TENGGARA TIMUR 144 Pre-Electrified - - - 124.36448 -9.56344 21290 5305010023 SAENAM NUSA TENGGARA TIMUR 599 Pre-Electrified - - - 124.30217 -9.54119 21291 5305011001 TUABATAN NUSA TENGGARA TIMUR 106 Pre-Electrified - - - 124.41306 -9.53823 21292 5305011001 TUABATAN NUSA TENGGARA TIMUR 412 Pre-Electrified - - - 124.41428 -9.53914 21293 5305011001 TUABATAN NUSA TENGGARA TIMUR 96 Pre-Electrified - - - 124.40378 -9.54291 21294 5305011001 TUABATAN NUSA TENGGARA TIMUR 31 Pre-Electrified - - - 124.40158 -9.54529 21295 5305011003 BIJAEPASU NUSA TENGGARA TIMUR 29 Pre-Electrified - - - 124.44125 -9.52614 21296 5305011003 BIJAEPASU NUSA TENGGARA TIMUR 25 Pre-Electrified - - - 124.44259 -9.52664 21297 5305011003 BIJAEPASU NUSA TENGGARA TIMUR 471 Pre-Electrified - - - 124.42524 -9.52825 21298 5305011003 BIJAEPASU NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 124.44030 -9.52696 21299 5305011003 BIJAEPASU NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 124.43939 -9.52689 21300 5305011003 BIJAEPASU NUSA TENGGARA TIMUR 32 Pre-Electrified - - - 124.44340 -9.52751 21301 5305011003 BIJAEPASU NUSA TENGGARA TIMUR 443 Pre-Electrified - - - 124.42194 -9.52910 21302 5305011003 BIJAEPASU NUSA TENGGARA TIMUR 169 Pre-Electrified - - - 124.42749 -9.52991 21303 5305011005 NIAN NUSA TENGGARA TIMUR 560 Pre-Electrified - - - 124.45385 -9.50855 21304 5305011005 NIAN NUSA TENGGARA TIMUR 16 OffGrid Systems 5 3 515 0.8 124.44171 -9.51002 Annex II – Demand forecast results Page 133 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 21305 5305011005 NIAN NUSA TENGGARA TIMUR 173 Pre-Electrified - - - 124.45081 -9.51637 21306 5305011005 NIAN NUSA TENGGARA TIMUR 684 Pre-Electrified - - - 124.44685 -9.52078 21307 5305011005 NIAN NUSA TENGGARA TIMUR 75 Pre-Electrified - - - 124.44375 -9.52556 21308 5305011005 NIAN NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 124.44229 -9.49658 21309 5305011005 NIAN NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 124.42618 -9.49191 21310 5305012001 OELNEKE NUSA TENGGARA TIMUR 15 Pre-Electrified - - - 124.39647 -9.48121 21311 5305012001 OELNEKE NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 124.39991 -9.48110 21312 5305012001 OELNEKE NUSA TENGGARA TIMUR 252 Pre-Electrified - - - 124.40868 -9.48558 21313 5305012001 OELNEKE NUSA TENGGARA TIMUR 138 Pre-Electrified - - - 124.40742 -9.48773 21314 5305012001 OELNEKE NUSA TENGGARA TIMUR 141 Pre-Electrified - - - 124.40806 -9.48723 21315 5305012001 OELNEKE NUSA TENGGARA TIMUR 137 Pre-Electrified - - - 124.40915 -9.48601 21316 5305012003 AINAN NUSA TENGGARA TIMUR 175 Pre-Electrified - - - 124.42392 -9.48308 21317 5305012003 AINAN NUSA TENGGARA TIMUR 189 Pre-Electrified - - - 124.41845 -9.48479 21318 5305012004 OEOLO NUSA TENGGARA TIMUR 15 Pre-Electrified - - - 124.37490 -9.48118 21319 5305012004 OEOLO NUSA TENGGARA TIMUR 17 Pre-Electrified - - - 124.38952 -9.46661 21320 5305012004 OEOLO NUSA TENGGARA TIMUR 210 Pre-Electrified - - - 124.39127 -9.47485 21321 5305012004 OEOLO NUSA TENGGARA TIMUR 69 Pre-Electrified - - - 124.39389 -9.47810 21322 5305012004 OEOLO NUSA TENGGARA TIMUR 296 Pre-Electrified - - - 124.38170 -9.47821 21323 5305012004 OEOLO NUSA TENGGARA TIMUR 46 Pre-Electrified - - - 124.37573 -9.48147 21324 5305012004 OEOLO NUSA TENGGARA TIMUR 217 Pre-Electrified - - - 124.37842 -9.48253 21325 5305012004 OEOLO NUSA TENGGARA TIMUR 32 Pre-Electrified - - - 124.37816 -9.48106 21326 5305012006 BATNES NUSA TENGGARA TIMUR 564 Pre-Electrified - - - 124.37408 -9.48163 21327 5305012006 BATNES NUSA TENGGARA TIMUR 82 Pre-Electrified - - - 124.37204 -9.48146 21328 5305020032 OESENA NUSA TENGGARA TIMUR 1 031 Pre-Electrified - - - 124.46325 -9.40784 21329 5305020032 OESENA NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 124.46224 -9.41175 21330 5305020032 OESENA NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 124.46673 -9.41352 21331 5305020032 OESENA NUSA TENGGARA TIMUR 139 Pre-Electrified - - - 124.46992 -9.41482 21332 5305020032 OESENA NUSA TENGGARA TIMUR 940 Pre-Electrified - - - 124.47251 -9.41705 21333 5305020032 OESENA NUSA TENGGARA TIMUR 91 Pre-Electrified - - - 124.47439 -9.42335 21334 5305020032 OESENA NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 124.46060 -9.41229 21335 5305020032 OESENA NUSA TENGGARA TIMUR 113 Pre-Electrified - - - 124.46657 -9.41188 21336 5305020033 TAEKAS NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 124.49385 -9.40079 21337 5305020033 TAEKAS NUSA TENGGARA TIMUR 876 Pre-Electrified - - - 124.48763 -9.40708 21338 5305020033 TAEKAS NUSA TENGGARA TIMUR 599 Pre-Electrified - - - 124.48341 -9.41063 21339 5305020033 TAEKAS NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 124.48207 -9.41113 21340 5305020033 TAEKAS NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 124.48145 -9.41163 21341 5305020034 FEMNASI NUSA TENGGARA TIMUR 239 Pre-Electrified - - - 124.49699 -9.39263 21342 5305020034 FEMNASI NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 124.49414 -9.39334 21343 5305020034 FEMNASI NUSA TENGGARA TIMUR 247 Pre-Electrified - - - 124.49282 -9.39719 21344 5305020034 FEMNASI NUSA TENGGARA TIMUR 2 Pre-Electrified - - - 124.49418 -9.40068 21345 5305020034 FEMNASI NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 124.50096 -9.38881 21346 5305020034 FEMNASI NUSA TENGGARA TIMUR 10 Pre-Electrified - - - 124.50037 -9.39141 21347 5305020036 TUNOE NUSA TENGGARA TIMUR 17 OffGrid Systems 5 3 515 0.8 124.52704 -9.36658 21348 5305020039 KAENBAUN NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 124.47399 -9.37562 21349 5305020041 AMOL NUSA TENGGARA TIMUR 281 Pre-Electrified - - - 124.46811 -9.39625 21350 5305020041 AMOL NUSA TENGGARA TIMUR 175 Pre-Electrified - - - 124.46575 -9.39581 21351 5305020041 AMOL NUSA TENGGARA TIMUR 474 Pre-Electrified - - - 124.46360 -9.39456 21352 5305020041 AMOL NUSA TENGGARA TIMUR 94 Pre-Electrified - - - 124.45724 -9.39727 21353 5305020051 BITEFA NUSA TENGGARA TIMUR 6 Pre-Electrified - - - 124.46083 -9.37517 21354 5305020051 BITEFA NUSA TENGGARA TIMUR 259 Pre-Electrified - - - 124.46276 -9.37687 21355 5305021002 SEO NUSA TENGGARA TIMUR 513 Pre-Electrified - - - 124.48973 -9.63609 21356 5305021003 NOEBAUN NUSA TENGGARA TIMUR 278 Pre-Electrified - - - 124.49246 -9.62755 21357 5305021003 NOEBAUN NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 124.47664 -9.58171 21358 5305021003 NOEBAUN NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 124.49227 -9.61314 21359 5305021003 NOEBAUN NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 124.48602 -9.61405 21360 5305021003 NOEBAUN NUSA TENGGARA TIMUR 678 Pre-Electrified - - - 124.49188 -9.61929 21361 5305021003 NOEBAUN NUSA TENGGARA TIMUR 25 OffGrid Systems 6 4 218 0.9 124.48267 -9.62060 21362 5305021004 POPNAM NUSA TENGGARA TIMUR 27 MiniGrid Systems 7 4 921 1.1 124.55425 -9.62807 21363 5305021004 POPNAM NUSA TENGGARA TIMUR 96 Pre-Electrified - - - 124.51982 -9.63880 21364 5305021004 POPNAM NUSA TENGGARA TIMUR 160 Pre-Electrified - - - 124.51803 -9.64265 21365 5305021004 POPNAM NUSA TENGGARA TIMUR 79 Pre-Electrified - - - 124.51599 -9.64360 21366 5305021004 POPNAM NUSA TENGGARA TIMUR 26 Pre-Electrified - - - 124.53105 -9.62570 21367 5305021004 POPNAM NUSA TENGGARA TIMUR 639 Pre-Electrified - - - 124.54076 -9.61364 21368 5305021004 POPNAM NUSA TENGGARA TIMUR 17 Pre-Electrified - - - 124.53195 -9.61949 21369 5305021004 POPNAM NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 124.53201 -9.62396 21370 5305021008 NIBAAF NUSA TENGGARA TIMUR 57 MiniGrid Systems 15 10 545 2.3 124.53417 -9.60106 21371 5305021010 OENAK NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 124.49955 -9.56395 21372 5305021010 OENAK NUSA TENGGARA TIMUR 534 Pre-Electrified - - - 124.50294 -9.56155 21373 5305021010 OENAK NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 124.50539 -9.56880 21374 5305021010 OENAK NUSA TENGGARA TIMUR 25 MiniGrid Systems 7 4 921 1.1 124.50500 -9.57501 21375 5305021011 NIFUBOKE NUSA TENGGARA TIMUR 2 Pre-Electrified - - - 124.48625 -9.57142 21376 5305021011 NIFUBOKE NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 124.48881 -9.57123 21377 5305021011 NIFUBOKE NUSA TENGGARA TIMUR 34 Pre-Electrified - - - 124.48478 -9.57320 21378 5305021011 NIFUBOKE NUSA TENGGARA TIMUR 305 Pre-Electrified - - - 124.49336 -9.57400 21379 5305021011 NIFUBOKE NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 124.48737 -9.57618 21380 5305021011 NIFUBOKE NUSA TENGGARA TIMUR 514 Pre-Electrified - - - 124.49277 -9.58219 21381 5305021011 NIFUBOKE NUSA TENGGARA TIMUR 191 Pre-Electrified - - - 124.48731 -9.57252 21382 5305021012 BIJELI NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 124.48670 -9.58103 21383 5305021012 BIJELI NUSA TENGGARA TIMUR 201 Pre-Electrified - - - 124.48640 -9.58428 21384 5305021012 BIJELI NUSA TENGGARA TIMUR 181 Pre-Electrified - - - 124.48910 -9.58887 21385 5305021012 BIJELI NUSA TENGGARA TIMUR 11 Pre-Electrified - - - 124.49156 -9.58874 21386 5305021012 BIJELI NUSA TENGGARA TIMUR 92 Pre-Electrified - - - 124.49118 -9.59104 21387 5305021012 BIJELI NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 124.49143 -9.60882 21388 5305021012 BIJELI NUSA TENGGARA TIMUR 42 MiniGrid Systems 10 7 030 1.5 124.50381 -9.60905 21389 5305021013 NOEMUTI NUSA TENGGARA TIMUR 168 Pre-Electrified - - - 124.47918 -9.56561 Annex II – Demand forecast results Page 134 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 21390 5305021013 NOEMUTI NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 124.48150 -9.56799 21391 5305021013 NOEMUTI NUSA TENGGARA TIMUR 458 Pre-Electrified - - - 124.48025 -9.57187 21392 5305021014 FATUMUTI NUSA TENGGARA TIMUR 310 Pre-Electrified - - - 124.48944 -9.56328 21393 5305021014 FATUMUTI NUSA TENGGARA TIMUR 154 Pre-Electrified - - - 124.49676 -9.56598 21394 5305021014 FATUMUTI NUSA TENGGARA TIMUR 73 Pre-Electrified - - - 124.49415 -9.56527 21395 5305021014 FATUMUTI NUSA TENGGARA TIMUR 390 Pre-Electrified - - - 124.48425 -9.56884 21396 5305021014 FATUMUTI NUSA TENGGARA TIMUR 127 Pre-Electrified - - - 124.49475 -9.56784 21397 5305021014 FATUMUTI NUSA TENGGARA TIMUR 67 Pre-Electrified - - - 124.49298 -9.56895 21398 5305021014 FATUMUTI NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 124.48944 -9.57064 21399 5305021014 FATUMUTI NUSA TENGGARA TIMUR 8 Pre-Electrified - - - 124.49337 -9.56963 21400 5305021015 BANFANU NUSA TENGGARA TIMUR 240 Pre-Electrified - - - 124.46398 -9.56512 21401 5305021015 BANFANU NUSA TENGGARA TIMUR 131 Pre-Electrified - - - 124.47064 -9.56526 21402 5305021015 BANFANU NUSA TENGGARA TIMUR 79 MiniGrid Systems 21 14 763 3.2 124.44297 -9.56629 21403 5305021015 BANFANU NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 124.46183 -9.56694 21404 5305021015 BANFANU NUSA TENGGARA TIMUR 424 Pre-Electrified - - - 124.46493 -9.56737 21405 5305021015 BANFANU NUSA TENGGARA TIMUR 164 Pre-Electrified - - - 124.46601 -9.56952 21406 5305021015 BANFANU NUSA TENGGARA TIMUR 34 Pre-Electrified - - - 124.46835 -9.57314 21407 5305021015 BANFANU NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 124.47598 -9.57316 21408 5305021015 BANFANU NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 124.47209 -9.57374 21409 5305021015 BANFANU NUSA TENGGARA TIMUR 24 Pre-Electrified - - - 124.46722 -9.57277 21410 5305021016 OEPERIGI NUSA TENGGARA TIMUR 300 Pre-Electrified - - - 124.50616 -9.64405 21411 5305022001 MAURISU NUSA TENGGARA TIMUR 17 OffGrid Systems 5 3 515 0.8 124.54967 -9.54559 21412 5305022001 MAURISU NUSA TENGGARA TIMUR 54 MiniGrid Systems 16 11 248 2.4 124.62162 -9.55818 21413 5305022001 MAURISU NUSA TENGGARA TIMUR 26 MiniGrid Systems 8 5 624 1.2 124.58820 -9.56100 21414 5305022001 MAURISU NUSA TENGGARA TIMUR 9 OffGrid Systems 3 2 109 0.5 124.60313 -9.56644 21415 5305022001 MAURISU NUSA TENGGARA TIMUR 5 OffGrid Systems 2 1 406 0.3 124.64625 -9.55508 21416 5305022002 NAIOLA NUSA TENGGARA TIMUR 353 Pre-Electrified - - - 124.49736 -9.53804 21417 5305022002 NAIOLA NUSA TENGGARA TIMUR 647 Pre-Electrified - - - 124.49712 -9.55758 21418 5305022002 NAIOLA NUSA TENGGARA TIMUR 72 MiniGrid Systems 20 14 060 3.0 124.54925 -9.54581 21419 5305022002 NAIOLA NUSA TENGGARA TIMUR 26 Pre-Electrified - - - 124.50266 -9.54532 21420 5305022002 NAIOLA NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 124.50889 -9.55041 21421 5305022002 NAIOLA NUSA TENGGARA TIMUR 83 Pre-Electrified - - - 124.51098 -9.55284 21422 5305022002 NAIOLA NUSA TENGGARA TIMUR 1 054 Pre-Electrified - - - 124.50622 -9.55735 21423 5305022002 NAIOLA NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 124.50073 -9.55702 21424 5305022002 NAIOLA NUSA TENGGARA TIMUR 76 Pre-Electrified - - - 124.51231 -9.55874 21425 5305022002 NAIOLA NUSA TENGGARA TIMUR 19 Pre-Electrified - - - 124.50257 -9.54443 21426 5305022003 OETALUS NUSA TENGGARA TIMUR 515 Pre-Electrified - - - 124.45822 -9.49840 21427 5305022004 OELAMI NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 124.46442 -9.50019 21428 5305022004 OELAMI NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 124.46029 -9.48488 21429 5305022004 OELAMI NUSA TENGGARA TIMUR 108 Pre-Electrified - - - 124.46144 -9.48643 21430 5305022004 OELAMI NUSA TENGGARA TIMUR 10 Pre-Electrified - - - 124.46423 -9.49988 21431 5305022004 OELAMI NUSA TENGGARA TIMUR 143 Pre-Electrified - - - 124.46190 -9.49214 21432 5305022004 OELAMI NUSA TENGGARA TIMUR 112 Pre-Electrified - - - 124.46045 -9.49412 21433 5305022005 KIUSILI NUSA TENGGARA TIMUR 94 Pre-Electrified - - - 124.44206 -9.48699 21434 5305022005 KIUSILI NUSA TENGGARA TIMUR 466 Pre-Electrified - - - 124.45079 -9.49277 21435 5305022005 KIUSILI NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 124.45526 -9.49503 21436 5305022005 KIUSILI NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 124.45650 -9.49538 21437 5305022005 KIUSILI NUSA TENGGARA TIMUR 119 Pre-Electrified - - - 124.45872 -9.49675 21438 5305022005 KIUSILI NUSA TENGGARA TIMUR 19 Pre-Electrified - - - 124.45950 -9.49503 21439 5305022006 MAURISU UTARA NUSA TENGGARA TIMUR 44 MiniGrid Systems 11 7 733 1.7 124.54447 -9.52953 21440 5305022006 MAURISU UTARA NUSA TENGGARA TIMUR 21 OffGrid Systems 6 4 218 0.9 124.58325 -9.53132 21441 5305022006 MAURISU UTARA NUSA TENGGARA TIMUR 72 MiniGrid Systems 18 12 654 2.7 124.64468 -9.55503 21442 5305022008 TUBLOPO NUSA TENGGARA TIMUR 11 OffGrid Systems 3 2 109 0.5 124.56727 -9.51166 21443 5305022008 TUBLOPO NUSA TENGGARA TIMUR 45 MiniGrid Systems 12 8 436 1.8 124.57334 -9.51289 21444 5305022008 TUBLOPO NUSA TENGGARA TIMUR 12 OffGrid Systems 3 2 109 0.5 124.58898 -9.51333 21445 5305023001 NIMASI NUSA TENGGARA TIMUR 13 OffGrid Systems 4 2 812 0.6 124.43008 -9.44655 21446 5305023001 NIMASI NUSA TENGGARA TIMUR 6 OffGrid Systems 2 1 406 0.3 124.44393 -9.45342 21447 5305023006 OENINO NUSA TENGGARA TIMUR 1 OffGrid Systems 1 703 0.2 124.44444 -9.45341 21448 5305023006 OENINO NUSA TENGGARA TIMUR 10 OffGrid Systems 3 2 109 0.5 124.44951 -9.46222 21449 5305023006 OENINO NUSA TENGGARA TIMUR 1 OffGrid Systems 1 703 0.2 124.41060 -9.46354 21450 5305023006 OENINO NUSA TENGGARA TIMUR 289 Pre-Electrified - - - 124.41859 -9.47494 21451 5305023006 OENINO NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 124.42054 -9.47612 21452 5305024006 INBATE NUSA TENGGARA TIMUR 7 OffGrid Systems 2 1 406 0.3 124.39513 -9.44150 21453 5305025003 HAUMENI NUSA TENGGARA TIMUR 4 OffGrid Systems 2 1 406 0.3 124.42078 -9.38472 21454 5305025003 HAUMENI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.40894 -9.40927 21455 5305025005 TES NUSA TENGGARA TIMUR 5 OffGrid Systems 2 1 406 0.3 124.39825 -9.37691 21456 5305025005 TES NUSA TENGGARA TIMUR 7 OffGrid Systems 2 1 406 0.3 124.39854 -9.37767 21457 5305025005 TES NUSA TENGGARA TIMUR 7 OffGrid Systems 2 1 406 0.3 124.39245 -9.37984 21458 5305025005 TES NUSA TENGGARA TIMUR 32 MiniGrid Systems 8 5 624 1.2 124.38804 -9.38112 21459 5305025007 BANAIN NUSA TENGGARA TIMUR 14 OffGrid Systems 4 2 812 0.6 124.43339 -9.36218 21460 5305026001 SUNSEA NUSA TENGGARA TIMUR 20 OffGrid Systems 5 3 515 0.8 124.49106 -9.33441 21461 5305026002 BAKITOLAS NUSA TENGGARA TIMUR 24 MiniGrid Systems 7 4 921 1.1 124.47378 -9.29902 21462 5305026002 BAKITOLAS NUSA TENGGARA TIMUR 10 OffGrid Systems 3 2 109 0.5 124.47247 -9.30305 21463 5305026004 MANAMAS NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.50679 -9.21513 21464 5305026004 MANAMAS NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.50507 -9.23166 21465 5305026004 MANAMAS NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.50505 -9.23416 21466 5305026004 MANAMAS NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.50061 -9.19996 21467 5305027001 NAOB NUSA TENGGARA TIMUR 232 Pre-Electrified - - - 124.61086 -9.60652 21468 5305027001 NAOB NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 124.56239 -9.60599 21469 5305027001 NAOB NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 124.60469 -9.60727 21470 5305027001 NAOB NUSA TENGGARA TIMUR 97 Pre-Electrified - - - 124.56738 -9.60881 21471 5305027001 NAOB NUSA TENGGARA TIMUR 420 Pre-Electrified - - - 124.59808 -9.60873 21472 5305027001 NAOB NUSA TENGGARA TIMUR 456 Pre-Electrified - - - 124.56739 -9.61256 21473 5305027002 HAEKTO NUSA TENGGARA TIMUR 267 Pre-Electrified - - - 124.62361 -9.57730 21474 5305027002 HAEKTO NUSA TENGGARA TIMUR 7 Pre-Electrified - - - 124.61927 -9.57713 Annex II – Demand forecast results Page 135 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 21475 5305027002 HAEKTO NUSA TENGGARA TIMUR 2 Pre-Electrified - - - 124.61818 -9.57935 21476 5305027002 HAEKTO NUSA TENGGARA TIMUR 46 Pre-Electrified - - - 124.61122 -9.59166 21477 5305027002 HAEKTO NUSA TENGGARA TIMUR 113 Pre-Electrified - - - 124.61582 -9.59617 21478 5305027002 HAEKTO NUSA TENGGARA TIMUR 222 Pre-Electrified - - - 124.63411 -9.57472 21479 5305027002 HAEKTO NUSA TENGGARA TIMUR 247 Pre-Electrified - - - 124.62704 -9.57654 21480 5305027003 MANIKIN NUSA TENGGARA TIMUR 35 MiniGrid Systems 8 5 624 1.2 124.59857 -9.57239 21481 5305027003 MANIKIN NUSA TENGGARA TIMUR 585 Pre-Electrified - - - 124.61300 -9.57805 21482 5305027003 MANIKIN NUSA TENGGARA TIMUR 15 OffGrid Systems 4 2 812 0.6 124.57596 -9.58156 21483 5305027003 MANIKIN NUSA TENGGARA TIMUR 13 Pre-Electrified - - - 124.60710 -9.58338 21484 5305027003 MANIKIN NUSA TENGGARA TIMUR 387 Pre-Electrified - - - 124.58357 -9.58692 21485 5305027003 MANIKIN NUSA TENGGARA TIMUR 17 Pre-Electrified - - - 124.60283 -9.58663 21486 5305027004 KUAKEN NUSA TENGGARA TIMUR 7 OffGrid Systems 3 2 109 0.5 124.57544 -9.58161 21487 5305030001 MAUBELI NUSA TENGGARA TIMUR 180 Pre-Electrified - - - 124.47602 -9.47134 21488 5305030001 MAUBELI NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 124.48062 -9.47638 21489 5305030001 MAUBELI NUSA TENGGARA TIMUR 79 Pre-Electrified - - - 124.48164 -9.47670 21490 5305030001 MAUBELI NUSA TENGGARA TIMUR 711 Pre-Electrified - - - 124.48472 -9.47792 21491 5305030001 MAUBELI NUSA TENGGARA TIMUR 85 Pre-Electrified - - - 124.48036 -9.47747 21492 5305030001 MAUBELI NUSA TENGGARA TIMUR 515 Pre-Electrified - - - 124.47660 -9.47841 21493 5305030001 MAUBELI NUSA TENGGARA TIMUR 84 Pre-Electrified - - - 124.48534 -9.48019 21494 5305030001 MAUBELI NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 124.48638 -9.48062 21495 5305030001 MAUBELI NUSA TENGGARA TIMUR 1 523 Pre-Electrified - - - 124.49128 -9.48360 21496 5305030001 MAUBELI NUSA TENGGARA TIMUR 134 Pre-Electrified - - - 124.48827 -9.48227 21497 5305030001 MAUBELI NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 124.49010 -9.48330 21498 5305030001 MAUBELI NUSA TENGGARA TIMUR 17 Pre-Electrified - - - 124.47559 -9.48329 21499 5305030001 MAUBELI NUSA TENGGARA TIMUR 31 Pre-Electrified - - - 124.48450 -9.48358 21500 5305030001 MAUBELI NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 124.48511 -9.48382 21501 5305030001 MAUBELI NUSA TENGGARA TIMUR 150 Pre-Electrified - - - 124.47024 -9.48383 21502 5305030001 MAUBELI NUSA TENGGARA TIMUR 646 Pre-Electrified - - - 124.46965 -9.48742 21503 5305030001 MAUBELI NUSA TENGGARA TIMUR 356 Pre-Electrified - - - 124.49145 -9.48999 21504 5305030001 MAUBELI NUSA TENGGARA TIMUR 71 Pre-Electrified - - - 124.49304 -9.49342 21505 5305030001 MAUBELI NUSA TENGGARA TIMUR 274 Pre-Electrified - - - 124.48767 -9.49312 21506 5305030002 SASI NUSA TENGGARA TIMUR 484 Pre-Electrified - - - 124.49106 -9.50084 21507 5305030002 SASI NUSA TENGGARA TIMUR 366 Pre-Electrified - - - 124.49407 -9.50076 21508 5305030002 SASI NUSA TENGGARA TIMUR 56 Pre-Electrified - - - 124.49221 -9.50289 21509 5305030002 SASI NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 124.49755 -9.50339 21510 5305030002 SASI NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 124.49625 -9.50364 21511 5305030002 SASI NUSA TENGGARA TIMUR 216 Pre-Electrified - - - 124.49222 -9.50752 21512 5305030002 SASI NUSA TENGGARA TIMUR 5 Pre-Electrified - - - 124.48880 -9.50007 21513 5305030002 SASI NUSA TENGGARA TIMUR 286 Pre-Electrified - - - 124.49502 -9.49878 21514 5305030002 SASI NUSA TENGGARA TIMUR 1 192 Pre-Electrified - - - 124.49153 -9.49770 21515 5305030002 SASI NUSA TENGGARA TIMUR 161 Pre-Electrified - - - 124.49387 -9.49939 21516 5305030002 SASI NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 124.48804 -9.49399 21517 5305030002 SASI NUSA TENGGARA TIMUR 590 Pre-Electrified - - - 124.48854 -9.49859 21518 5305030002 SASI NUSA TENGGARA TIMUR 219 Pre-Electrified - - - 124.51334 -9.50085 21519 5305030002 SASI NUSA TENGGARA TIMUR 111 Pre-Electrified - - - 124.50943 -9.50099 21520 5305030004 TUBUHUE NUSA TENGGARA TIMUR 507 Pre-Electrified - - - 124.49495 -9.46583 21521 5305030004 TUBUHUE NUSA TENGGARA TIMUR 674 Pre-Electrified - - - 124.48945 -9.47639 21522 5305030004 TUBUHUE NUSA TENGGARA TIMUR 51 Pre-Electrified - - - 124.49294 -9.47765 21523 5305030004 TUBUHUE NUSA TENGGARA TIMUR 12 Pre-Electrified - - - 124.49372 -9.47821 21524 5305030004 TUBUHUE NUSA TENGGARA TIMUR 29 Pre-Electrified - - - 124.52238 -9.45594 21525 5305030004 TUBUHUE NUSA TENGGARA TIMUR 183 Pre-Electrified - - - 124.52053 -9.46122 21526 5305030004 TUBUHUE NUSA TENGGARA TIMUR 332 Pre-Electrified - - - 124.50703 -9.46225 21527 5305030004 TUBUHUE NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 124.52460 -9.47535 21528 5305030004 TUBUHUE NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 124.52622 -9.47816 21529 5305030004 TUBUHUE NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 124.51272 -9.48169 21530 5305030004 TUBUHUE NUSA TENGGARA TIMUR 87 Pre-Electrified - - - 124.51529 -9.48249 21531 5305030004 TUBUHUE NUSA TENGGARA TIMUR 166 Pre-Electrified - - - 124.50991 -9.48368 21532 5305030004 TUBUHUE NUSA TENGGARA TIMUR 577 Pre-Electrified - - - 124.52509 -9.45477 21533 5305030004 TUBUHUE NUSA TENGGARA TIMUR 119 Pre-Electrified - - - 124.50746 -9.48085 21534 5305030004 TUBUHUE NUSA TENGGARA TIMUR 368 Pre-Electrified - - - 124.52833 -9.49053 21535 5305030004 TUBUHUE NUSA TENGGARA TIMUR 220 Pre-Electrified - - - 124.51049 -9.49309 21536 5305030005 KEFAMENANU SELATAN NUSA TENGGARA TIMUR 7 347 Pre-Electrified - - - 124.48139 -9.45932 21537 5305030005 KEFAMENANU SELATAN NUSA TENGGARA TIMUR 132 Pre-Electrified - - - 124.48450 -9.46114 21538 5305030005 KEFAMENANU SELATAN NUSA TENGGARA TIMUR 578 Pre-Electrified - - - 124.48366 -9.46330 21539 5305030005 KEFAMENANU SELATAN NUSA TENGGARA TIMUR 358 Pre-Electrified - - - 124.48498 -9.46626 21540 5305030005 KEFAMENANU SELATAN NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 124.48828 -9.46653 21541 5305030005 KEFAMENANU SELATAN NUSA TENGGARA TIMUR 90 Pre-Electrified - - - 124.48430 -9.46715 21542 5305030005 KEFAMENANU SELATAN NUSA TENGGARA TIMUR 324 Pre-Electrified - - - 124.49001 -9.46766 21543 5305030005 KEFAMENANU SELATAN NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.47906 -9.46771 21544 5305030005 KEFAMENANU SELATAN NUSA TENGGARA TIMUR 309 Pre-Electrified - - - 124.47999 -9.47170 21545 5305030005 KEFAMENANU SELATAN NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.48113 -9.47407 21546 5305030005 KEFAMENANU SELATAN NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 124.48350 -9.47430 21547 5305030005 KEFAMENANU SELATAN NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 124.48856 -9.47127 21548 5305030006 BENPASI NUSA TENGGARA TIMUR 5 701 Pre-Electrified - - - 124.47510 -9.45843 21549 5305030006 BENPASI NUSA TENGGARA TIMUR 87 Pre-Electrified - - - 124.47837 -9.46758 21550 5305030007 BANSONE NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 124.46569 -9.44635 21551 5305030007 BANSONE NUSA TENGGARA TIMUR 2 063 Pre-Electrified - - - 124.47094 -9.44697 21552 5305030007 BANSONE NUSA TENGGARA TIMUR 198 Pre-Electrified - - - 124.46481 -9.45354 21553 5305030007 BANSONE NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 124.47302 -9.45218 21554 5305030008 KEFAMENANU TENGAH NUSA TENGGARA TIMUR 84 Pre-Electrified - - - 124.48196 -9.43953 21555 5305030008 KEFAMENANU TENGAH NUSA TENGGARA TIMUR 34 Pre-Electrified - - - 124.48175 -9.45086 21556 5305030008 KEFAMENANU TENGAH NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.47403 -9.44449 21557 5305030008 KEFAMENANU TENGAH NUSA TENGGARA TIMUR 5 799 Pre-Electrified - - - 124.47871 -9.44534 21558 5305030009 APLASI NUSA TENGGARA TIMUR 2 552 Pre-Electrified - - - 124.48077 -9.43366 21559 5305030010 KEFAMENANU UTARA NUSA TENGGARA TIMUR 352 Pre-Electrified - - - 124.47086 -9.43441 Annex II – Demand forecast results Page 136 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 21560 5305030010 KEFAMENANU UTARA NUSA TENGGARA TIMUR 2 081 Pre-Electrified - - - 124.47917 -9.43041 21561 5305040007 SUSULAKU NUSA TENGGARA TIMUR 36 MiniGrid Systems 9 6 327 1.4 124.67552 -9.51771 21562 5305040007 SUSULAKU NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 124.69492 -9.48397 21563 5305040007 SUSULAKU NUSA TENGGARA TIMUR 466 Pre-Electrified - - - 124.68871 -9.48418 21564 5305040007 SUSULAKU NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 124.69528 -9.48530 21565 5305040007 SUSULAKU NUSA TENGGARA TIMUR 11 OffGrid Systems 3 2 109 0.5 124.70768 -9.49633 21566 5305040007 SUSULAKU NUSA TENGGARA TIMUR 134 Pre-Electrified - - - 124.69955 -9.48518 21567 5305040008 AINIUT NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 124.66930 -9.44244 21568 5305040008 AINIUT NUSA TENGGARA TIMUR 227 Pre-Electrified - - - 124.67481 -9.44766 21569 5305040008 AINIUT NUSA TENGGARA TIMUR 94 Pre-Electrified - - - 124.66901 -9.44889 21570 5305040008 AINIUT NUSA TENGGARA TIMUR 949 Pre-Electrified - - - 124.69810 -9.46799 21571 5305040008 AINIUT NUSA TENGGARA TIMUR 28 OffGrid Systems 5 3 515 0.8 124.68870 -9.47065 21572 5305040008 AINIUT NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 124.70866 -9.47387 21573 5305040008 AINIUT NUSA TENGGARA TIMUR 16 Pre-Electrified - - - 124.69933 -9.47473 21574 5305040008 AINIUT NUSA TENGGARA TIMUR 75 MiniGrid Systems 14 9 842 2.1 124.72240 -9.49508 21575 5305040009 LOERAM NUSA TENGGARA TIMUR 811 Pre-Electrified - - - 124.73702 -9.46659 21576 5305040010 OINBIT NUSA TENGGARA TIMUR 152 Pre-Electrified - - - 124.74256 -9.42657 21577 5305040010 OINBIT NUSA TENGGARA TIMUR 29 Pre-Electrified - - - 124.73822 -9.43024 21578 5305040010 OINBIT NUSA TENGGARA TIMUR 424 Pre-Electrified - - - 124.73469 -9.43327 21579 5305040010 OINBIT NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 124.74046 -9.42802 21580 5305040010 OINBIT NUSA TENGGARA TIMUR 444 Pre-Electrified - - - 124.76421 -9.39739 21581 5305040010 OINBIT NUSA TENGGARA TIMUR 807 Pre-Electrified - - - 124.75943 -9.40600 21582 5305040011 NUNMAFO NUSA TENGGARA TIMUR 213 Pre-Electrified - - - 124.72807 -9.44098 21583 5305040011 NUNMAFO NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 124.72359 -9.44227 21584 5305040011 NUNMAFO NUSA TENGGARA TIMUR 124 Pre-Electrified - - - 124.71510 -9.44373 21585 5305040011 NUNMAFO NUSA TENGGARA TIMUR 1 416 Pre-Electrified - - - 124.70607 -9.44114 21586 5305040012 MANUNAIN A NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 124.68732 -9.44487 21587 5305040012 MANUNAIN A NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 124.68289 -9.44563 21588 5305040012 MANUNAIN A NUSA TENGGARA TIMUR 1 450 Pre-Electrified - - - 124.69540 -9.44340 21589 5305040013 MANUNAIN B NUSA TENGGARA TIMUR 7 OffGrid Systems 2 1 406 0.3 124.66634 -9.40924 21590 5305040013 MANUNAIN B NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 124.66797 -9.42406 21591 5305040013 MANUNAIN B NUSA TENGGARA TIMUR 7 Pre-Electrified - - - 124.67269 -9.42239 21592 5305040013 MANUNAIN B NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 124.67032 -9.43412 21593 5305040013 MANUNAIN B NUSA TENGGARA TIMUR 748 Pre-Electrified - - - 124.67383 -9.43345 21594 5305040014 TAPENPAH NUSA TENGGARA TIMUR 614 Pre-Electrified - - - 124.63921 -9.43740 21595 5305040014 TAPENPAH NUSA TENGGARA TIMUR 118 Pre-Electrified - - - 124.64378 -9.44174 21596 5305040014 TAPENPAH NUSA TENGGARA TIMUR 284 Pre-Electrified - - - 124.65273 -9.44427 21597 5305040015 SEKON NUSA TENGGARA TIMUR 94 Pre-Electrified - - - 124.61924 -9.45079 21598 5305040015 SEKON NUSA TENGGARA TIMUR 25 Pre-Electrified - - - 124.61636 -9.45610 21599 5305040015 SEKON NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 124.62984 -9.45702 21600 5305040015 SEKON NUSA TENGGARA TIMUR 668 Pre-Electrified - - - 124.63230 -9.46197 21601 5305040027 SUSULAKU B NUSA TENGGARA TIMUR 15 OffGrid Systems 4 2 812 0.6 124.70218 -9.53122 21602 5305040027 SUSULAKU B NUSA TENGGARA TIMUR 12 OffGrid Systems 3 2 109 0.5 124.74264 -9.55444 21603 5305040029 KEUN NUSA TENGGARA TIMUR 935 Pre-Electrified - - - 124.65438 -9.39396 21604 5305040030 FATOIN NUSA TENGGARA TIMUR 1 240 Pre-Electrified - - - 124.70106 -9.44632 21605 5305041006 HUMUSU A NUSA TENGGARA TIMUR 75 MiniGrid Systems 18 12 654 2.7 124.54976 -9.27458 21606 5305041006 HUMUSU A NUSA TENGGARA TIMUR 13 OffGrid Systems 4 2 812 0.6 124.52533 -9.31157 21607 5305041006 HUMUSU A NUSA TENGGARA TIMUR 84 MiniGrid Systems 20 14 060 3.0 124.53428 -9.32338 21608 5305041007 FATUMTASA NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.54945 -9.28768 21609 5305041007 FATUMTASA NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.52549 -9.31125 21610 5305041008 HUMUSU B NUSA TENGGARA TIMUR 73 Pre-Electrified - - - 124.59125 -9.21261 21611 5305041009 OESOKO NUSA TENGGARA TIMUR 36 Pre-Electrified - - - 124.58004 -9.17719 21612 5305041009 OESOKO NUSA TENGGARA TIMUR 179 Pre-Electrified - - - 124.57504 -9.17675 21613 5305041009 OESOKO NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 124.57158 -9.17944 21614 5305041009 OESOKO NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 124.57100 -9.17021 21615 5305041009 OESOKO NUSA TENGGARA TIMUR 26 MiniGrid Systems 7 4 921 1.1 124.56664 -9.19677 21616 5305041009 OESOKO NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 124.56509 -9.18583 21617 5305041009 OESOKO NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 124.56287 -9.17718 21618 5305041009 OESOKO NUSA TENGGARA TIMUR 330 Pre-Electrified - - - 124.56385 -9.18414 21619 5305041009 OESOKO NUSA TENGGARA TIMUR 140 Pre-Electrified - - - 124.56038 -9.18531 21620 5305041009 OESOKO NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 124.55781 -9.17882 21621 5305041010 HUMUSU C NUSA TENGGARA TIMUR 162 Pre-Electrified - - - 124.49867 -9.17989 21622 5305041010 HUMUSU C NUSA TENGGARA TIMUR 82 Pre-Electrified - - - 124.49393 -9.19025 21623 5305041010 HUMUSU C NUSA TENGGARA TIMUR 140 Pre-Electrified - - - 124.49202 -9.18533 21624 5305041010 HUMUSU C NUSA TENGGARA TIMUR 809 Pre-Electrified - - - 124.49118 -9.18120 21625 5305041010 HUMUSU C NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 124.48804 -9.17618 21626 5305041010 HUMUSU C NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 124.48747 -9.17491 21627 5305041010 HUMUSU C NUSA TENGGARA TIMUR 136 Pre-Electrified - - - 124.48065 -9.17465 21628 5305041010 HUMUSU C NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 124.53119 -9.19121 21629 5305041010 HUMUSU C NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 124.52898 -9.19190 21630 5305041010 HUMUSU C NUSA TENGGARA TIMUR 433 Pre-Electrified - - - 124.52554 -9.19021 21631 5305041010 HUMUSU C NUSA TENGGARA TIMUR 99 Pre-Electrified - - - 124.52137 -9.18812 21632 5305041010 HUMUSU C NUSA TENGGARA TIMUR 71 Pre-Electrified - - - 124.51605 -9.18105 21633 5305041010 HUMUSU C NUSA TENGGARA TIMUR 165 Pre-Electrified - - - 124.50648 -9.18234 21634 5305041010 HUMUSU C NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 124.50095 -9.17722 21635 5305041010 HUMUSU C NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.50001 -9.19701 21636 5305041010 HUMUSU C NUSA TENGGARA TIMUR 74 Pre-Electrified - - - 124.50034 -9.17991 21637 5305042001 SUBUN NUSA TENGGARA TIMUR 96 Pre-Electrified - - - 124.55456 -9.44027 21638 5305042001 SUBUN NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 124.55007 -9.43967 21639 5305042001 SUBUN NUSA TENGGARA TIMUR 15 Pre-Electrified - - - 124.54899 -9.44843 21640 5305042001 SUBUN NUSA TENGGARA TIMUR 8 Pre-Electrified - - - 124.54297 -9.45041 21641 5305042001 SUBUN NUSA TENGGARA TIMUR 5 Pre-Electrified - - - 124.55364 -9.45315 21642 5305042001 SUBUN NUSA TENGGARA TIMUR 6 Pre-Electrified - - - 124.53646 -9.45335 21643 5305042001 SUBUN NUSA TENGGARA TIMUR 32 Pre-Electrified - - - 124.53098 -9.45415 21644 5305042001 SUBUN NUSA TENGGARA TIMUR 112 Pre-Electrified - - - 124.54186 -9.45665 Annex II – Demand forecast results Page 137 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 21645 5305042001 SUBUN NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 124.54847 -9.45771 21646 5305042001 SUBUN NUSA TENGGARA TIMUR 7 OffGrid Systems 2 1 406 0.3 124.55519 -9.46754 21647 5305042001 SUBUN NUSA TENGGARA TIMUR 4 OffGrid Systems 2 1 406 0.3 124.54263 -9.46966 21648 5305042001 SUBUN NUSA TENGGARA TIMUR 22 OffGrid Systems 6 4 218 0.9 124.55633 -9.46996 21649 5305042001 SUBUN NUSA TENGGARA TIMUR 44 Pre-Electrified - - - 124.53379 -9.47008 21650 5305042001 SUBUN NUSA TENGGARA TIMUR 13 Pre-Electrified - - - 124.53468 -9.47606 21651 5305042001 SUBUN NUSA TENGGARA TIMUR 155 Pre-Electrified - - - 124.53410 -9.48100 21652 5305042001 SUBUN NUSA TENGGARA TIMUR 3 Pre-Electrified - - - 124.52853 -9.45268 21653 5305042002 LAPEOM NUSA TENGGARA TIMUR 220 Pre-Electrified - - - 124.54982 -9.48784 21654 5305042002 LAPEOM NUSA TENGGARA TIMUR 61 Pre-Electrified - - - 124.55378 -9.49069 21655 5305042003 USAPINONOT NUSA TENGGARA TIMUR 11 Pre-Electrified - - - 124.56523 -9.48469 21656 5305042003 USAPINONOT NUSA TENGGARA TIMUR 22 Pre-Electrified - - - 124.55663 -9.48811 21657 5305042003 USAPINONOT NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 124.56311 -9.49712 21658 5305042003 USAPINONOT NUSA TENGGARA TIMUR 387 Pre-Electrified - - - 124.56043 -9.48816 21659 5305042004 ATMEN NUSA TENGGARA TIMUR 22 Pre-Electrified - - - 124.58250 -9.48107 21660 5305042004 ATMEN NUSA TENGGARA TIMUR 404 Pre-Electrified - - - 124.58551 -9.48227 21661 5305042004 ATMEN NUSA TENGGARA TIMUR 79 Pre-Electrified - - - 124.59214 -9.48541 21662 5305042004 ATMEN NUSA TENGGARA TIMUR 312 Pre-Electrified - - - 124.59652 -9.48831 21663 5305042004 ATMEN NUSA TENGGARA TIMUR 19 MiniGrid Systems 10 7 030 1.5 124.59371 -9.49643 21664 5305042004 ATMEN NUSA TENGGARA TIMUR 372 Pre-Electrified - - - 124.60136 -9.48609 21665 5305042005 LETNEO NUSA TENGGARA TIMUR 295 Pre-Electrified - - - 124.60608 -9.48485 21666 5305042005 LETNEO NUSA TENGGARA TIMUR 808 Pre-Electrified - - - 124.60310 -9.46594 21667 5305042006 BANAE NUSA TENGGARA TIMUR 803 Pre-Electrified - - - 124.57317 -9.43115 21668 5305042006 BANAE NUSA TENGGARA TIMUR 529 Pre-Electrified - - - 124.56506 -9.43239 21669 5305042006 BANAE NUSA TENGGARA TIMUR 29 Pre-Electrified - - - 124.56815 -9.43416 21670 5305042006 BANAE NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 124.56663 -9.43454 21671 5305042006 BANAE NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 124.55890 -9.43580 21672 5305042006 BANAE NUSA TENGGARA TIMUR 25 Pre-Electrified - - - 124.56297 -9.43697 21673 5305042006 BANAE NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 124.55756 -9.43748 21674 5305042007 DESA ADMEN NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 124.57944 -9.48152 21675 5305042007 DESA ADMEN NUSA TENGGARA TIMUR 61 Pre-Electrified - - - 124.57916 -9.48352 21676 5305042007 DESA ADMEN NUSA TENGGARA TIMUR 545 Pre-Electrified - - - 124.57732 -9.48484 21677 5305043001 LANAUS NUSA TENGGARA TIMUR 1 284 Pre-Electrified - - - 124.64064 -9.39844 21678 5305043001 LANAUS NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 124.63812 -9.40481 21679 5305043001 LANAUS NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 124.63633 -9.40800 21680 5305043001 LANAUS NUSA TENGGARA TIMUR 103 Pre-Electrified - - - 124.64468 -9.41087 21681 5305043001 LANAUS NUSA TENGGARA TIMUR 193 Pre-Electrified - - - 124.64237 -9.41453 21682 5305043001 LANAUS NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.64085 -9.43636 21683 5305043002 LETMAFO NUSA TENGGARA TIMUR 8 Pre-Electrified - - - 124.60878 -9.42567 21684 5305043002 LETMAFO NUSA TENGGARA TIMUR 655 Pre-Electrified - - - 124.60606 -9.42652 21685 5305043002 LETMAFO NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 124.61959 -9.42988 21686 5305043002 LETMAFO NUSA TENGGARA TIMUR 77 Pre-Electrified - - - 124.62327 -9.43044 21687 5305043002 LETMAFO NUSA TENGGARA TIMUR 19 Pre-Electrified - - - 124.61006 -9.43075 21688 5305043002 LETMAFO NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 124.62571 -9.43075 21689 5305043002 LETMAFO NUSA TENGGARA TIMUR 189 Pre-Electrified - - - 124.63372 -9.43273 21690 5305043003 MAUBESI NUSA TENGGARA TIMUR 8 OffGrid Systems 2 1 406 0.3 124.55291 -9.37753 21691 5305043003 MAUBESI NUSA TENGGARA TIMUR 296 Pre-Electrified - - - 124.58630 -9.41530 21692 5305043003 MAUBESI NUSA TENGGARA TIMUR 1 200 Pre-Electrified - - - 124.58208 -9.42161 21693 5305043003 MAUBESI NUSA TENGGARA TIMUR 98 Pre-Electrified - - - 124.59265 -9.42361 21694 5305043003 MAUBESI NUSA TENGGARA TIMUR 31 Pre-Electrified - - - 124.59817 -9.42497 21695 5305043003 MAUBESI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.60207 -9.42586 21696 5305043003 MAUBESI NUSA TENGGARA TIMUR 1 115 Pre-Electrified - - - 124.58280 -9.42788 21697 5305043005 SONE NUSA TENGGARA TIMUR 20 MiniGrid Systems 7 4 921 1.1 124.59297 -9.37790 21698 5305043005 SONE NUSA TENGGARA TIMUR 21 MiniGrid Systems 7 4 921 1.1 124.60768 -9.36372 21699 5305044002 FAFINESU B NUSA TENGGARA TIMUR 20 OffGrid Systems 6 4 218 0.9 124.54847 -9.37611 21700 5305044002 FAFINESU B NUSA TENGGARA TIMUR 5 OffGrid Systems 2 1 406 0.3 124.54739 -9.35906 21701 5305044002 FAFINESU B NUSA TENGGARA TIMUR 11 OffGrid Systems 3 2 109 0.5 124.55853 -9.35667 21702 5305044003 FAFINESU A NUSA TENGGARA TIMUR 46 MiniGrid Systems 12 8 436 1.8 124.61737 -9.38722 21703 5305044003 FAFINESU A NUSA TENGGARA TIMUR 11 OffGrid Systems 3 2 109 0.5 124.59062 -9.39781 21704 5305044003 FAFINESU A NUSA TENGGARA TIMUR 10 Pre-Electrified - - - 124.58711 -9.40013 21705 5305044003 FAFINESU A NUSA TENGGARA TIMUR 1 242 Pre-Electrified - - - 124.59378 -9.41654 21706 5305044003 FAFINESU A NUSA TENGGARA TIMUR 12 Pre-Electrified - - - 124.59231 -9.40788 21707 5305044003 FAFINESU A NUSA TENGGARA TIMUR 9 OffGrid Systems 3 2 109 0.5 124.59806 -9.41212 21708 5305044004 FAFINESU C NUSA TENGGARA TIMUR 47 MiniGrid Systems 13 9 139 2.0 124.58387 -9.36476 21709 5305044005 BANUAN NUSA TENGGARA TIMUR 29 MiniGrid Systems 7 4 921 1.1 124.58571 -9.30988 21710 5305044005 BANUAN NUSA TENGGARA TIMUR 13 OffGrid Systems 3 2 109 0.5 124.54972 -9.31803 21711 5305044005 BANUAN NUSA TENGGARA TIMUR 12 OffGrid Systems 3 2 109 0.5 124.56935 -9.34004 21712 5305044006 FAFINESU NUSA TENGGARA TIMUR 16 OffGrid Systems 5 3 515 0.8 124.56423 -9.38025 21713 5305050001 PANTAE NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.63825 -9.39420 21714 5305050001 PANTAE NUSA TENGGARA TIMUR 713 Pre-Electrified - - - 124.64908 -9.39272 21715 5305050002 OENAEM NUSA TENGGARA TIMUR 374 Pre-Electrified - - - 124.66294 -9.38360 21716 5305050002 OENAEM NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 124.65917 -9.38584 21717 5305050002 OENAEM NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.65359 -9.38877 21718 5305050003 UPFAON NUSA TENGGARA TIMUR 563 Pre-Electrified - - - 124.69997 -9.37671 21719 5305050003 UPFAON NUSA TENGGARA TIMUR 158 Pre-Electrified - - - 124.67934 -9.37725 21720 5305050003 UPFAON NUSA TENGGARA TIMUR 341 Pre-Electrified - - - 124.69195 -9.37887 21721 5305050003 UPFAON NUSA TENGGARA TIMUR 141 Pre-Electrified - - - 124.68397 -9.38012 21722 5305050003 UPFAON NUSA TENGGARA TIMUR 172 Pre-Electrified - - - 124.67708 -9.38360 21723 5305050003 UPFAON NUSA TENGGARA TIMUR 11 Pre-Electrified - - - 124.67918 -9.38829 21724 5305050003 UPFAON NUSA TENGGARA TIMUR 894 Pre-Electrified - - - 124.69931 -9.37284 21725 5305050007 TAUTPAH NUSA TENGGARA TIMUR 13 OffGrid Systems 4 2 812 0.6 124.73625 -9.29162 21726 5305050007 TAUTPAH NUSA TENGGARA TIMUR 13 OffGrid Systems 4 2 812 0.6 124.71165 -9.29768 21727 5305050010 TOKBESI NUSA TENGGARA TIMUR 368 Pre-Electrified - - - 124.70599 -9.34795 21728 5305050010 TOKBESI NUSA TENGGARA TIMUR 376 Pre-Electrified - - - 124.70588 -9.35049 21729 5305050010 TOKBESI NUSA TENGGARA TIMUR 16 OffGrid Systems 4 2 812 0.6 124.68554 -9.30683 Annex II – Demand forecast results Page 138 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 21730 5305050011 SUPUN NUSA TENGGARA TIMUR 34 Pre-Electrified - - - 124.69179 -9.35733 21731 5305050011 SUPUN NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 124.69227 -9.36199 21732 5305050011 SUPUN NUSA TENGGARA TIMUR 1 138 Pre-Electrified - - - 124.69601 -9.36466 21733 5305050011 SUPUN NUSA TENGGARA TIMUR 53 Pre-Electrified - - - 124.69210 -9.36995 21734 5305050011 SUPUN NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.69384 -9.37153 21735 5305050012 SAINIUP NUSA TENGGARA TIMUR 12 OffGrid Systems 3 2 109 0.5 124.68815 -9.33059 21736 5305050012 SAINIUP NUSA TENGGARA TIMUR 32 MiniGrid Systems 8 5 624 1.2 124.66809 -9.33357 21737 5305050012 SAINIUP NUSA TENGGARA TIMUR 170 Pre-Electrified - - - 124.70313 -9.35757 21738 5305050013 TUNBAEN NUSA TENGGARA TIMUR 24 MiniGrid Systems 7 4 921 1.1 124.67282 -9.30877 21739 5305050013 TUNBAEN NUSA TENGGARA TIMUR 45 MiniGrid Systems 12 8 436 1.8 124.65760 -9.32038 21740 5305051001 T'EBA NUSA TENGGARA TIMUR 1 255 Pre-Electrified - - - 124.77393 -9.38828 21741 5305051001 T'EBA NUSA TENGGARA TIMUR 20 OffGrid Systems 5 3 515 0.8 124.75435 -9.37139 21742 5305051002 OERINBESI NUSA TENGGARA TIMUR 136 Pre-Electrified - - - 124.79007 -9.35651 21743 5305051003 OEKOPA NUSA TENGGARA TIMUR 13 OffGrid Systems 4 2 812 0.6 124.79034 -9.32115 21744 5305051004 T'EBA TIMUR NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 124.78775 -9.37519 21745 5305051004 T'EBA TIMUR NUSA TENGGARA TIMUR 55 Pre-Electrified - - - 124.78870 -9.37582 21746 5305051004 T'EBA TIMUR NUSA TENGGARA TIMUR 1 228 Pre-Electrified - - - 124.78341 -9.38043 21747 5305051004 T'EBA TIMUR NUSA TENGGARA TIMUR 89 Pre-Electrified - - - 124.78836 -9.37441 21748 5305051004 T'EBA TIMUR NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 124.78879 -9.37498 21749 5305051004 T'EBA TIMUR NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 124.79120 -9.36147 21750 5305052002 LUNIUP NUSA TENGGARA TIMUR 2 OffGrid Systems 1 703 0.2 124.64609 -9.28362 21751 5305052002 LUNIUP NUSA TENGGARA TIMUR 14 OffGrid Systems 4 2 812 0.6 124.70891 -9.28512 21752 5305052002 LUNIUP NUSA TENGGARA TIMUR 12 OffGrid Systems 3 2 109 0.5 124.69389 -9.27092 21753 5305052002 LUNIUP NUSA TENGGARA TIMUR 13 OffGrid Systems 3 2 109 0.5 124.66404 -9.27889 21754 5305052002 LUNIUP NUSA TENGGARA TIMUR 19 OffGrid Systems 5 3 515 0.8 124.68038 -9.24558 21755 5305052002 LUNIUP NUSA TENGGARA TIMUR 17 OffGrid Systems 4 2 812 0.6 124.67856 -9.24454 21756 5305052003 MATABESI NUSA TENGGARA TIMUR 9 OffGrid Systems 3 2 109 0.5 124.64226 -9.25072 21757 5305052003 MATABESI NUSA TENGGARA TIMUR 9 OffGrid Systems 3 2 109 0.5 124.64869 -9.25743 21758 5305052003 MATABESI NUSA TENGGARA TIMUR 11 OffGrid Systems 4 2 812 0.6 124.65194 -9.25756 21759 5305052003 MATABESI NUSA TENGGARA TIMUR 13 OffGrid Systems 5 3 515 0.8 124.64942 -9.25846 21760 5305052003 MATABESI NUSA TENGGARA TIMUR 19 MiniGrid Systems 7 4 921 1.1 124.68316 -9.22375 21761 5305052003 MATABESI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.68064 -9.21286 21762 5305052004 KAUBELE NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.60615 -9.21066 21763 5305052005 OEPUAH NUSA TENGGARA TIMUR 52 Pre-Electrified - - - 124.62256 -9.16262 21764 5305052005 OEPUAH NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 124.59861 -9.19597 21765 5305052005 OEPUAH NUSA TENGGARA TIMUR 317 Pre-Electrified - - - 124.60288 -9.18027 21766 5305052005 OEPUAH NUSA TENGGARA TIMUR 1 040 Pre-Electrified - - - 124.59241 -9.19189 21767 5305052006 OEPUAH UTARA NUSA TENGGARA TIMUR 478 Pre-Electrified - - - 124.59642 -9.17659 21768 5305052006 OEPUAH UTARA NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 124.60169 -9.17999 21769 5305052006 OEPUAH UTARA NUSA TENGGARA TIMUR 189 Pre-Electrified - - - 124.58779 -9.18217 21770 5305052007 OEPUAH SELATAN NUSA TENGGARA TIMUR 21 OffGrid Systems 6 4 218 0.9 124.61683 -9.20530 21771 5305052007 OEPUAH SELATAN NUSA TENGGARA TIMUR 40 MiniGrid Systems 10 7 030 1.5 124.60575 -9.21003 21772 5305052007 OEPUAH SELATAN NUSA TENGGARA TIMUR 22 Pre-Electrified - - - 124.59320 -9.20402 21773 5305052007 OEPUAH SELATAN NUSA TENGGARA TIMUR 649 Pre-Electrified - - - 124.59804 -9.20512 21774 5305060004 SAPAEN NUSA TENGGARA TIMUR 36 MiniGrid Systems 9 6 327 1.4 124.76016 -9.29252 21775 5305060004 SAPAEN NUSA TENGGARA TIMUR 31 MiniGrid Systems 8 5 624 1.2 124.76992 -9.31576 21776 5305060005 TAUNBAEN NUSA TENGGARA TIMUR 14 OffGrid Systems 4 2 812 0.6 124.77446 -9.28942 21777 5305060005 TAUNBAEN NUSA TENGGARA TIMUR 3 OffGrid Systems 1 703 0.2 124.77514 -9.28917 21778 5305060005 TAUNBAEN NUSA TENGGARA TIMUR 10 OffGrid Systems 3 2 109 0.5 124.78054 -9.28929 21779 5305060005 TAUNBAEN NUSA TENGGARA TIMUR 10 OffGrid Systems 3 2 109 0.5 124.76525 -9.29128 21780 5305060006 TUALENE NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 124.82281 -9.29722 21781 5305060006 TUALENE NUSA TENGGARA TIMUR 28 MiniGrid Systems 8 5 624 1.2 124.80946 -9.31011 21782 5305060006 TUALENE NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 124.81922 -9.33040 21783 5305060006 TUALENE NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 124.81850 -9.33172 21784 5305060006 TUALENE NUSA TENGGARA TIMUR 142 Pre-Electrified - - - 124.82399 -9.33268 21785 5305060006 TUALENE NUSA TENGGARA TIMUR 11 OffGrid Systems 3 2 109 0.5 124.82479 -9.30601 21786 5305060008 HAUTEAS NUSA TENGGARA TIMUR 19 Pre-Electrified - - - 124.82038 -9.27576 21787 5305060008 HAUTEAS NUSA TENGGARA TIMUR 166 Pre-Electrified - - - 124.82888 -9.27800 21788 5305060008 HAUTEAS NUSA TENGGARA TIMUR 24 Pre-Electrified - - - 124.82889 -9.28877 21789 5305060008 HAUTEAS NUSA TENGGARA TIMUR 281 Pre-Electrified - - - 124.82084 -9.28905 21790 5305060008 HAUTEAS NUSA TENGGARA TIMUR 53 Pre-Electrified - - - 124.82828 -9.29114 21791 5305060008 HAUTEAS NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.83741 -9.29515 21792 5305060008 HAUTEAS NUSA TENGGARA TIMUR 16 Pre-Electrified - - - 124.82593 -9.29411 21793 5305060009 BORONUBAEN NUSA TENGGARA TIMUR 77 Pre-Electrified - - - 124.83609 -9.28633 21794 5305060009 BORONUBAEN NUSA TENGGARA TIMUR 279 Pre-Electrified - - - 124.83416 -9.28913 21795 5305060009 BORONUBAEN NUSA TENGGARA TIMUR 168 Pre-Electrified - - - 124.83840 -9.29442 21796 5305060009 BORONUBAEN NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 124.83919 -9.29703 21797 5305060009 BORONUBAEN NUSA TENGGARA TIMUR 273 Pre-Electrified - - - 124.84352 -9.31304 21798 5305060009 BORONUBAEN NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 124.84133 -9.32013 21799 5305061001 SIFANIHA NUSA TENGGARA TIMUR 23 OffGrid Systems 6 4 218 0.9 124.78059 -9.13655 21800 5305061001 SIFANIHA NUSA TENGGARA TIMUR 89 MiniGrid Systems 21 14 763 3.2 124.78814 -9.10031 21801 5305061002 MOTADIK NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.80509 -9.05500 21802 5305061002 MOTADIK NUSA TENGGARA TIMUR 290 Pre-Electrified - - - 124.80294 -9.05797 21803 5305061002 MOTADIK NUSA TENGGARA TIMUR 191 Pre-Electrified - - - 124.79793 -9.06259 21804 5305061002 MOTADIK NUSA TENGGARA TIMUR 730 Pre-Electrified - - - 124.79747 -9.06633 21805 5305061002 MOTADIK NUSA TENGGARA TIMUR 111 Pre-Electrified - - - 124.79257 -9.06860 21806 5305061002 MOTADIK NUSA TENGGARA TIMUR 136 Pre-Electrified - - - 124.79207 -9.06534 21807 5305061002 MOTADIK NUSA TENGGARA TIMUR 250 Pre-Electrified - - - 124.78954 -9.07218 21808 5305061003 NONATBATAN NUSA TENGGARA TIMUR 38 MiniGrid Systems 11 7 733 1.7 124.79957 -9.11836 21809 5305061003 NONATBATAN NUSA TENGGARA TIMUR 179 Pre-Electrified - - - 124.77732 -9.07214 21810 5305061003 NONATBATAN NUSA TENGGARA TIMUR 81 Pre-Electrified - - - 124.77278 -9.07598 21811 5305061003 NONATBATAN NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 124.78865 -9.07054 21812 5305061003 NONATBATAN NUSA TENGGARA TIMUR 19 Pre-Electrified - - - 124.78834 -9.07208 21813 5305061003 NONATBATAN NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 124.78788 -9.07359 21814 5305061003 NONATBATAN NUSA TENGGARA TIMUR 282 Pre-Electrified - - - 124.76955 -9.07631 Annex II – Demand forecast results Page 139 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 21815 5305061003 NONATBATAN NUSA TENGGARA TIMUR 168 Pre-Electrified - - - 124.76962 -9.08173 21816 5305061003 NONATBATAN NUSA TENGGARA TIMUR 102 Pre-Electrified - - - 124.76707 -9.08343 21817 5305061004 TUAMESE NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.76618 -9.08401 21818 5305061005 MAUKABATAN NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 124.74130 -9.08397 21819 5305061005 MAUKABATAN NUSA TENGGARA TIMUR 16 Pre-Electrified - - - 124.73326 -9.10169 21820 5305061005 MAUKABATAN NUSA TENGGARA TIMUR 6 Pre-Electrified - - - 124.74983 -9.08718 21821 5305061005 MAUKABATAN NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 124.74558 -9.08542 21822 5305061005 MAUKABATAN NUSA TENGGARA TIMUR 684 Pre-Electrified - - - 124.74142 -9.09308 21823 5305061005 MAUKABATAN NUSA TENGGARA TIMUR 193 Pre-Electrified - - - 124.75831 -9.09480 21824 5305061005 MAUKABATAN NUSA TENGGARA TIMUR 25 Pre-Electrified - - - 124.75515 -9.09323 21825 5305061005 MAUKABATAN NUSA TENGGARA TIMUR 17 Pre-Electrified - - - 124.75057 -9.08709 21826 5305061006 KOTAFOUN NUSA TENGGARA TIMUR 9 OffGrid Systems 3 2 109 0.5 124.74981 -9.18350 21827 5305061006 KOTAFOUN NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.74314 -9.12498 21828 5305061006 KOTAFOUN NUSA TENGGARA TIMUR 1 285 Pre-Electrified - - - 124.73313 -9.10921 21829 5305061006 KOTAFOUN NUSA TENGGARA TIMUR 43 MiniGrid Systems 11 7 733 1.7 124.75809 -9.15768 21830 5305061006 KOTAFOUN NUSA TENGGARA TIMUR 53 MiniGrid Systems 14 9 842 2.1 124.75098 -9.18374 21831 5305061007 PONU NUSA TENGGARA TIMUR 24 MiniGrid Systems 7 4 921 1.1 124.70569 -9.13744 21832 5305061007 PONU NUSA TENGGARA TIMUR 50 MiniGrid Systems 13 9 139 2.0 124.69841 -9.15986 21833 5305061007 PONU NUSA TENGGARA TIMUR 30 MiniGrid Systems 8 5 624 1.2 124.68792 -9.16022 21834 5305061007 PONU NUSA TENGGARA TIMUR 774 Pre-Electrified - - - 124.69181 -9.13003 21835 5305061007 PONU NUSA TENGGARA TIMUR 44 Pre-Electrified - - - 124.68707 -9.13517 21836 5305061007 PONU NUSA TENGGARA TIMUR 51 Pre-Electrified - - - 124.68582 -9.13461 21837 5305061007 PONU NUSA TENGGARA TIMUR 2 276 Pre-Electrified - - - 124.68636 -9.14626 21838 5305061007 PONU NUSA TENGGARA TIMUR 163 Pre-Electrified - - - 124.68219 -9.15722 21839 5305061007 PONU NUSA TENGGARA TIMUR 29 Pre-Electrified - - - 124.68194 -9.12868 21840 5305061007 PONU NUSA TENGGARA TIMUR 64 Pre-Electrified - - - 124.68141 -9.14421 21841 5305061007 PONU NUSA TENGGARA TIMUR 839 Pre-Electrified - - - 124.68149 -9.15220 21842 5305061007 PONU NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 124.69698 -9.12401 21843 5305061007 PONU NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 124.69593 -9.12465 21844 5305061007 PONU NUSA TENGGARA TIMUR 1 OffGrid Systems 1 703 0.2 124.67426 -9.12493 21845 5305061008 OEMANU NUSA TENGGARA TIMUR 5 Pre-Electrified - - - 124.68164 -9.12858 21846 5305061008 OEMANU NUSA TENGGARA TIMUR 43 MiniGrid Systems 11 7 733 1.7 124.67483 -9.16446 21847 5305061008 OEMANU NUSA TENGGARA TIMUR 168 Pre-Electrified - - - 124.67417 -9.16011 21848 5305061008 OEMANU NUSA TENGGARA TIMUR 13 Pre-Electrified - - - 124.67312 -9.16066 21849 5305061008 OEMANU NUSA TENGGARA TIMUR 56 Pre-Electrified - - - 124.67180 -9.15668 21850 5305061008 OEMANU NUSA TENGGARA TIMUR 10 Pre-Electrified - - - 124.67109 -9.14900 21851 5305061008 OEMANU NUSA TENGGARA TIMUR 26 Pre-Electrified - - - 124.67097 -9.15029 21852 5305061008 OEMANU NUSA TENGGARA TIMUR 279 Pre-Electrified - - - 124.67072 -9.15259 21853 5305061009 NIFUTASI NUSA TENGGARA TIMUR 20 OffGrid Systems 6 4 218 0.9 124.71448 -9.25155 21854 5305061009 NIFUTASI NUSA TENGGARA TIMUR 14 OffGrid Systems 4 2 812 0.6 124.73122 -9.21413 21855 5305061009 NIFUTASI NUSA TENGGARA TIMUR 13 OffGrid Systems 4 2 812 0.6 124.72611 -9.24738 21856 5305061009 NIFUTASI NUSA TENGGARA TIMUR 34 MiniGrid Systems 10 7 030 1.5 124.71260 -9.19846 21857 5305061009 NIFUTASI NUSA TENGGARA TIMUR 20 OffGrid Systems 6 4 218 0.9 124.70700 -9.23251 21858 5305061009 NIFUTASI NUSA TENGGARA TIMUR 9 OffGrid Systems 3 2 109 0.5 124.69766 -9.21046 21859 5305061009 NIFUTASI NUSA TENGGARA TIMUR 31 MiniGrid Systems 9 6 327 1.4 124.69387 -9.24143 21860 5306010009 RABASA NUSA TENGGARA TIMUR 31 Pre-Electrified - - - 124.87457 -9.68221 21861 5306010009 RABASA NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 124.87299 -9.69470 21862 5306010009 RABASA NUSA TENGGARA TIMUR 12 Pre-Electrified - - - 124.87388 -9.69602 21863 5306010009 RABASA NUSA TENGGARA TIMUR 2 Pre-Electrified - - - 124.87474 -9.70101 21864 5306010009 RABASA NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 124.88994 -9.67127 21865 5306010009 RABASA NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 124.87529 -9.68234 21866 5306010009 RABASA NUSA TENGGARA TIMUR 5 Pre-Electrified - - - 124.87840 -9.69403 21867 5306010009 RABASA NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 124.87620 -9.69935 21868 5306010009 RABASA NUSA TENGGARA TIMUR 143 Pre-Electrified - - - 124.88478 -9.67374 21869 5306010010 RABASAHAIN NUSA TENGGARA TIMUR 92 Pre-Electrified - - - 124.91643 -9.66052 21870 5306010010 RABASAHAIN NUSA TENGGARA TIMUR 180 Pre-Electrified - - - 124.91558 -9.66194 21871 5306010011 UMATOOS NUSA TENGGARA TIMUR 1 955 Pre-Electrified - - - 124.92565 -9.65191 21872 5306010012 FAFOE NUSA TENGGARA TIMUR 76 Pre-Electrified - - - 124.93267 -9.64013 21873 5306010012 FAFOE NUSA TENGGARA TIMUR 34 Pre-Electrified - - - 124.93574 -9.64001 21874 5306010012 FAFOE NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 124.92657 -9.64401 21875 5306010012 FAFOE NUSA TENGGARA TIMUR 968 Pre-Electrified - - - 124.93153 -9.64588 21876 5306010013 SIKUN NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.93968 -9.62540 21877 5306010016 LASAEN NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.90485 -9.63237 21878 5306010016 LASAEN NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.92580 -9.64491 21879 5306010016 LASAEN NUSA TENGGARA TIMUR 957 Pre-Electrified - - - 124.92039 -9.64772 21880 5306010017 BESIKAMA NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.90841 -9.64750 21881 5306010017 BESIKAMA NUSA TENGGARA TIMUR 1 440 Pre-Electrified - - - 124.91150 -9.64331 21882 5306010018 UMALOR NUSA TENGGARA TIMUR 1 531 Pre-Electrified - - - 124.92084 -9.65654 21883 5306010018 UMALOR NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.92200 -9.65798 21884 5306010018 UMALOR NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.91936 -9.66692 21885 5306010019 LOOFOUN NUSA TENGGARA TIMUR 58 Pre-Electrified - - - 124.89203 -9.66121 21886 5306010020 MAKTIHAN NUSA TENGGARA TIMUR 307 Pre-Electrified - - - 124.90734 -9.64672 21887 5306010020 MAKTIHAN NUSA TENGGARA TIMUR 1 179 Pre-Electrified - - - 124.90151 -9.64323 21888 5306010027 MOTAULUN NUSA TENGGARA TIMUR 684 Pre-Electrified - - - 124.88620 -9.62890 21889 5306010027 MOTAULUN NUSA TENGGARA TIMUR 657 Pre-Electrified - - - 124.89302 -9.63219 21890 5306010027 MOTAULUN NUSA TENGGARA TIMUR 51 Pre-Electrified - - - 124.88206 -9.62451 21891 5306010032 RABASA HAERAIN NUSA TENGGARA TIMUR 860 Pre-Electrified - - - 124.89180 -9.66971 21892 5306010033 MOTAAIN NUSA TENGGARA TIMUR 67 Pre-Electrified - - - 124.96001 -9.63467 21893 5306010035 RAIMATAUS NUSA TENGGARA TIMUR 658 Pre-Electrified - - - 124.91480 -9.65500 21894 5306010035 RAIMATAUS NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 124.91161 -9.65583 21895 5306010036 NAAS NUSA TENGGARA TIMUR 988 Pre-Electrified - - - 124.89588 -9.63994 21896 5306011005 BIUDUKFOHO NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.74757 -9.60323 21897 5306011010 NAE T NUSA TENGGARA TIMUR 4 OffGrid Systems 1 703 0.2 124.71507 -9.60678 21898 5306011012 NANIN NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.77332 -9.58143 21899 5306011013 ALALA NUSA TENGGARA TIMUR 2 OffGrid Systems 1 703 0.2 124.77749 -9.58225 Annex II – Demand forecast results Page 140 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 21900 5306011019 MUKE NUSA TENGGARA TIMUR 2 OffGrid Systems 1 703 0.2 124.80637 -9.60412 21901 5306012002 ALKANI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.81806 -9.73092 21902 5306012004 LOROTOLUS NUSA TENGGARA TIMUR 63 MiniGrid Systems 16 11 248 2.4 124.82054 -9.67834 21903 5306012004 LOROTOLUS NUSA TENGGARA TIMUR 552 Pre-Electrified - - - 124.81837 -9.69336 21904 5306012004 LOROTOLUS NUSA TENGGARA TIMUR 16 Pre-Electrified - - - 124.81897 -9.69712 21905 5306012004 LOROTOLUS NUSA TENGGARA TIMUR 44 Pre-Electrified - - - 124.81873 -9.69870 21906 5306012005 WEULUN NUSA TENGGARA TIMUR 1 055 Pre-Electrified - - - 124.83324 -9.68534 21907 5306012006 WEOE NUSA TENGGARA TIMUR 134 Pre-Electrified - - - 124.84123 -9.66849 21908 5306012006 WEOE NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 124.83938 -9.67975 21909 5306012006 WEOE NUSA TENGGARA TIMUR 51 Pre-Electrified - - - 124.84104 -9.68089 21910 5306012006 WEOE NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 124.84735 -9.68313 21911 5306012006 WEOE NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 124.84776 -9.68750 21912 5306012006 WEOE NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 124.84800 -9.69009 21913 5306012006 WEOE NUSA TENGGARA TIMUR 2 945 Pre-Electrified - - - 124.83682 -9.69218 21914 5306012006 WEOE NUSA TENGGARA TIMUR 242 Pre-Electrified - - - 124.84872 -9.69568 21915 5306012006 WEOE NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 124.84877 -9.69980 21916 5306012006 WEOE NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 124.84434 -9.69990 21917 5306012006 WEOE NUSA TENGGARA TIMUR 34 Pre-Electrified - - - 124.84966 -9.70315 21918 5306012006 WEOE NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 124.84982 -9.70480 21919 5306012006 WEOE NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 124.83688 -9.67406 21920 5306012007 WEBRIAMATA NUSA TENGGARA TIMUR 248 Pre-Electrified - - - 124.86954 -9.68326 21921 5306012007 WEBRIAMATA NUSA TENGGARA TIMUR 656 Pre-Electrified - - - 124.85748 -9.68628 21922 5306012007 WEBRIAMATA NUSA TENGGARA TIMUR 190 Pre-Electrified - - - 124.86663 -9.68806 21923 5306012007 WEBRIAMATA NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.85869 -9.69084 21924 5306012007 WEBRIAMATA NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 124.86723 -9.69134 21925 5306012007 WEBRIAMATA NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.86059 -9.69193 21926 5306012008 BADARAI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.85427 -9.68579 21927 5306012008 BADARAI NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 124.85768 -9.69150 21928 5306012008 BADARAI NUSA TENGGARA TIMUR 198 Pre-Electrified - - - 124.85157 -9.69244 21929 5306012008 BADARAI NUSA TENGGARA TIMUR 506 Pre-Electrified - - - 124.86892 -9.69431 21930 5306012008 BADARAI NUSA TENGGARA TIMUR 117 Pre-Electrified - - - 124.86072 -9.69394 21931 5306012008 BADARAI NUSA TENGGARA TIMUR 13 Pre-Electrified - - - 124.85131 -9.69467 21932 5306012008 BADARAI NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 124.87266 -9.69461 21933 5306012008 BADARAI NUSA TENGGARA TIMUR 116 Pre-Electrified - - - 124.85352 -9.69601 21934 5306012008 BADARAI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.85163 -9.69750 21935 5306012008 BADARAI NUSA TENGGARA TIMUR 416 Pre-Electrified - - - 124.86429 -9.70013 21936 5306012008 BADARAI NUSA TENGGARA TIMUR 20 Pre-Electrified - - - 124.86178 -9.70096 21937 5306012009 HALIBASAR NUSA TENGGARA TIMUR 547 Pre-Electrified - - - 124.86926 -9.67132 21938 5306012009 HALIBASAR NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 124.86189 -9.67604 21939 5306012009 HALIBASAR NUSA TENGGARA TIMUR 79 Pre-Electrified - - - 124.86220 -9.67772 21940 5306012009 HALIBASAR NUSA TENGGARA TIMUR 481 Pre-Electrified - - - 124.87127 -9.68222 21941 5306012011 RABASA BIRIS NUSA TENGGARA TIMUR 151 Pre-Electrified - - - 124.84891 -9.67270 21942 5306012011 RABASA BIRIS NUSA TENGGARA TIMUR 81 Pre-Electrified - - - 124.85463 -9.67368 21943 5306012011 RABASA BIRIS NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 124.85624 -9.67454 21944 5306012011 RABASA BIRIS NUSA TENGGARA TIMUR 117 Pre-Electrified - - - 124.85832 -9.67644 21945 5306012011 RABASA BIRIS NUSA TENGGARA TIMUR 298 Pre-Electrified - - - 124.85590 -9.68056 21946 5306012011 RABASA BIRIS NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 124.84758 -9.68333 21947 5306012011 RABASA BIRIS NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 124.85636 -9.68405 21948 5306012011 RABASA BIRIS NUSA TENGGARA TIMUR 74 Pre-Electrified - - - 124.85462 -9.68539 21949 5306012011 RABASA BIRIS NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.84860 -9.68704 21950 5306013001 FOREKMODOK NUSA TENGGARA TIMUR 90 Pre-Electrified - - - 124.92731 -9.60309 21951 5306013001 FOREKMODOK NUSA TENGGARA TIMUR 102 Pre-Electrified - - - 124.92918 -9.60761 21952 5306013001 FOREKMODOK NUSA TENGGARA TIMUR 73 Pre-Electrified - - - 124.93004 -9.61277 21953 5306013001 FOREKMODOK NUSA TENGGARA TIMUR 2 OffGrid Systems 1 703 0.2 124.91565 -9.61074 21954 5306013003 HAUKLARAN NUSA TENGGARA TIMUR 8 Pre-Electrified - - - 124.86635 -9.65565 21955 5306013004 UMALAWAIN NUSA TENGGARA TIMUR 127 Pre-Electrified - - - 124.85762 -9.65517 21956 5306013004 UMALAWAIN NUSA TENGGARA TIMUR 151 Pre-Electrified - - - 124.86143 -9.65537 21957 5306013004 UMALAWAIN NUSA TENGGARA TIMUR 76 Pre-Electrified - - - 124.86574 -9.65647 21958 5306013004 UMALAWAIN NUSA TENGGARA TIMUR 98 Pre-Electrified - - - 124.86420 -9.65755 21959 5306013004 UMALAWAIN NUSA TENGGARA TIMUR 875 Pre-Electrified - - - 124.86042 -9.66369 21960 5306013005 BONETASEA NUSA TENGGARA TIMUR 452 Pre-Electrified - - - 124.85909 -9.66848 21961 5306013005 BONETASEA NUSA TENGGARA TIMUR 278 Pre-Electrified - - - 124.85995 -9.66657 21962 5306013005 BONETASEA NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 124.86421 -9.66943 21963 5306013007 LEUNKLOT NUSA TENGGARA TIMUR 242 Pre-Electrified - - - 124.85022 -9.64459 21964 5306013007 LEUNKLOT NUSA TENGGARA TIMUR 237 Pre-Electrified - - - 124.84598 -9.64881 21965 5306013007 LEUNKLOT NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.85625 -9.64908 21966 5306013007 LEUNKLOT NUSA TENGGARA TIMUR 81 Pre-Electrified - - - 124.85025 -9.64985 21967 5306013007 LEUNKLOT NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.85645 -9.65162 21968 5306013007 LEUNKLOT NUSA TENGGARA TIMUR 484 Pre-Electrified - - - 124.85060 -9.65320 21969 5306013007 LEUNKLOT NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.85660 -9.65444 21970 5306013008 LAKULO NUSA TENGGARA TIMUR 152 Pre-Electrified - - - 124.85844 -9.64385 21971 5306013008 LAKULO NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 124.85665 -9.64906 21972 5306013008 LAKULO NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 124.85656 -9.65065 21973 5306013008 LAKULO NUSA TENGGARA TIMUR 3 Pre-Electrified - - - 124.86349 -9.65452 21974 5306013008 LAKULO NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.86594 -9.65567 21975 5306013008 LAKULO NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 124.86590 -9.65468 21976 5306013009 LALETEN NUSA TENGGARA TIMUR 1 225 Pre-Electrified - - - 124.86006 -9.63631 21977 5306013009 LALETEN NUSA TENGGARA TIMUR 89 Pre-Electrified - - - 124.86619 -9.63579 21978 5306013009 LALETEN NUSA TENGGARA TIMUR 90 Pre-Electrified - - - 124.86609 -9.63890 21979 5306013009 LALETEN NUSA TENGGARA TIMUR 91 Pre-Electrified - - - 124.86218 -9.63926 21980 5306013009 LALETEN NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 124.85152 -9.64377 21981 5306013009 LALETEN NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.85099 -9.64435 21982 5306013009 LALETEN NUSA TENGGARA TIMUR 1 OffGrid Systems 1 703 0.2 124.86913 -9.64447 21983 5306013010 KLESELEON NUSA TENGGARA TIMUR 25 Pre-Electrified - - - 124.87470 -9.62607 21984 5306013010 KLESELEON NUSA TENGGARA TIMUR 24 Pre-Electrified - - - 124.87520 -9.62624 Annex II – Demand forecast results Page 141 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 21985 5306013010 KLESELEON NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 124.87631 -9.62749 21986 5306013010 KLESELEON NUSA TENGGARA TIMUR 69 Pre-Electrified - - - 124.88004 -9.62550 21987 5306013010 KLESELEON NUSA TENGGARA TIMUR 230 Pre-Electrified - - - 124.89831 -9.64420 21988 5306013010 KLESELEON NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 124.87454 -9.61604 21989 5306013010 KLESELEON NUSA TENGGARA TIMUR 26 Pre-Electrified - - - 124.87464 -9.62426 21990 5306013010 KLESELEON NUSA TENGGARA TIMUR 15 Pre-Electrified - - - 124.87522 -9.62434 21991 5306013010 KLESELEON NUSA TENGGARA TIMUR 53 Pre-Electrified - - - 124.88067 -9.62440 21992 5306013010 KLESELEON NUSA TENGGARA TIMUR 2 Pre-Electrified - - - 124.87508 -9.61631 21993 5306013010 KLESELEON NUSA TENGGARA TIMUR 440 Pre-Electrified - - - 124.87839 -9.61926 21994 5306013011 WEDEROK NUSA TENGGARA TIMUR 97 Pre-Electrified - - - 124.90397 -9.59748 21995 5306013011 WEDEROK NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.89722 -9.60141 21996 5306013011 WEDEROK NUSA TENGGARA TIMUR 1 086 Pre-Electrified - - - 124.90059 -9.61403 21997 5306013011 WEDEROK NUSA TENGGARA TIMUR 14 OffGrid Systems 3 2 109 0.5 124.91529 -9.61079 21998 5306013012 ANGKAES NUSA TENGGARA TIMUR 149 Pre-Electrified - - - 124.87234 -9.58826 21999 5306013012 ANGKAES NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 124.89672 -9.60102 22000 5306013012 ANGKAES NUSA TENGGARA TIMUR 984 Pre-Electrified - - - 124.89421 -9.60453 22001 5306013013 HAITIMUK NUSA TENGGARA TIMUR 211 Pre-Electrified - - - 124.86673 -9.61953 22002 5306013013 HAITIMUK NUSA TENGGARA TIMUR 58 Pre-Electrified - - - 124.87348 -9.61441 22003 5306013013 HAITIMUK NUSA TENGGARA TIMUR 733 Pre-Electrified - - - 124.86745 -9.60687 22004 5306013013 HAITIMUK NUSA TENGGARA TIMUR 1 304 Pre-Electrified - - - 124.86236 -9.60377 22005 5306013013 HAITIMUK NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 124.86179 -9.60140 22006 5306020003 BAKIRUK NUSA TENGGARA TIMUR 167 Pre-Electrified - - - 124.87346 -9.58300 22007 5306020003 BAKIRUK NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 124.87327 -9.58059 22008 5306020003 BAKIRUK NUSA TENGGARA TIMUR 369 Pre-Electrified - - - 124.88839 -9.57979 22009 5306020003 BAKIRUK NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 124.88628 -9.58289 22010 5306020003 BAKIRUK NUSA TENGGARA TIMUR 23 Pre-Electrified - - - 124.87656 -9.58418 22011 5306020003 BAKIRUK NUSA TENGGARA TIMUR 99 Pre-Electrified - - - 124.88356 -9.58389 22012 5306020003 BAKIRUK NUSA TENGGARA TIMUR 19 Pre-Electrified - - - 124.87680 -9.58217 22013 5306020003 BAKIRUK NUSA TENGGARA TIMUR 189 Pre-Electrified - - - 124.87991 -9.58284 22014 5306020004 KATERI NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 124.87351 -9.57927 22015 5306020005 WEHALI NUSA TENGGARA TIMUR 267 Pre-Electrified - - - 124.91031 -9.55324 22016 5306020005 WEHALI NUSA TENGGARA TIMUR 230 Pre-Electrified - - - 124.90858 -9.55783 22017 5306020005 WEHALI NUSA TENGGARA TIMUR 3 600 Pre-Electrified - - - 124.90673 -9.56528 22018 5306020005 WEHALI NUSA TENGGARA TIMUR 64 Pre-Electrified - - - 124.89517 -9.58188 22019 5306020005 WEHALI NUSA TENGGARA TIMUR 853 Pre-Electrified - - - 124.90091 -9.58095 22020 5306020005 WEHALI NUSA TENGGARA TIMUR 127 Pre-Electrified - - - 124.89024 -9.58367 22021 5306020005 WEHALI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.90104 -9.58653 22022 5306020005 WEHALI NUSA TENGGARA TIMUR 69 Pre-Electrified - - - 124.89799 -9.59188 22023 5306020005 WEHALI NUSA TENGGARA TIMUR 861 Pre-Electrified - - - 124.89432 -9.59513 22024 5306020005 WEHALI NUSA TENGGARA TIMUR 22 Pre-Electrified - - - 124.89197 -9.59665 22025 5306020005 WEHALI NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 124.91223 -9.54947 22026 5306020005 WEHALI NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 124.91262 -9.54985 22027 5306020006 UMANENLAWALU NUSA TENGGARA TIMUR 383 Pre-Electrified - - - 124.90407 -9.57465 22028 5306020006 UMANENLAWALU NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 124.92044 -9.57308 22029 5306020006 UMANENLAWALU NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.92604 -9.57786 22030 5306020006 UMANENLAWALU NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.92688 -9.57904 22031 5306020006 UMANENLAWALU NUSA TENGGARA TIMUR 545 Pre-Electrified - - - 124.90298 -9.58342 22032 5306020006 UMANENLAWALU NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 124.90125 -9.58692 22033 5306020006 UMANENLAWALU NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.89809 -9.59387 22034 5306020006 UMANENLAWALU NUSA TENGGARA TIMUR 286 Pre-Electrified - - - 124.90634 -9.58265 22035 5306020006 UMANENLAWALU NUSA TENGGARA TIMUR 333 Pre-Electrified - - - 124.91453 -9.57941 22036 5306020006 UMANENLAWALU NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.91088 -9.57480 22037 5306020006 UMANENLAWALU NUSA TENGGARA TIMUR 269 Pre-Electrified - - - 124.91375 -9.58033 22038 5306020007 UMAKATAHAN NUSA TENGGARA TIMUR 1 425 Pre-Electrified - - - 124.90504 -9.57310 22039 5306020007 UMAKATAHAN NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 124.91970 -9.57342 22040 5306020007 UMAKATAHAN NUSA TENGGARA TIMUR 733 Pre-Electrified - - - 124.91577 -9.57494 22041 5306020007 UMAKATAHAN NUSA TENGGARA TIMUR 146 Pre-Electrified - - - 124.91102 -9.57434 22042 5306020007 UMAKATAHAN NUSA TENGGARA TIMUR 244 Pre-Electrified - - - 124.91299 -9.57654 22043 5306020008 NAIMANA NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 124.94231 -9.60037 22044 5306020008 NAIMANA NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 124.94558 -9.60174 22045 5306020008 NAIMANA NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 124.94392 -9.60167 22046 5306020008 NAIMANA NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 124.94424 -9.60472 22047 5306020008 NAIMANA NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.94679 -9.60510 22048 5306020008 NAIMANA NUSA TENGGARA TIMUR 693 Pre-Electrified - - - 124.93515 -9.60755 22049 5306020008 NAIMANA NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 124.94020 -9.61025 22050 5306020008 NAIMANA NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.94935 -9.61212 22051 5306020008 NAIMANA NUSA TENGGARA TIMUR 210 Pre-Electrified - - - 124.93946 -9.61334 22052 5306020008 NAIMANA NUSA TENGGARA TIMUR 733 Pre-Electrified - - - 124.94625 -9.61458 22053 5306020008 NAIMANA NUSA TENGGARA TIMUR 87 Pre-Electrified - - - 124.93775 -9.61120 22054 5306020009 LAWALU NUSA TENGGARA TIMUR 1 321 Pre-Electrified - - - 124.95905 -9.62061 22055 5306020010 FAHILUKA NUSA TENGGARA TIMUR 167 Pre-Electrified - - - 124.95177 -9.59925 22056 5306020010 FAHILUKA NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 124.94714 -9.60540 22057 5306020010 FAHILUKA NUSA TENGGARA TIMUR 1 372 Pre-Electrified - - - 124.95499 -9.60896 22058 5306020010 FAHILUKA NUSA TENGGARA TIMUR 46 Pre-Electrified - - - 124.96061 -9.60900 22059 5306020010 FAHILUKA NUSA TENGGARA TIMUR 69 Pre-Electrified - - - 124.95012 -9.61170 22060 5306020010 FAHILUKA NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 124.96579 -9.61182 22061 5306020010 FAHILUKA NUSA TENGGARA TIMUR 173 Pre-Electrified - - - 124.96041 -9.61269 22062 5306020010 FAHILUKA NUSA TENGGARA TIMUR 103 Pre-Electrified - - - 124.95691 -9.61417 22063 5306020010 FAHILUKA NUSA TENGGARA TIMUR 112 Pre-Electrified - - - 124.95476 -9.61579 22064 5306020010 FAHILUKA NUSA TENGGARA TIMUR 129 Pre-Electrified - - - 124.96031 -9.61589 22065 5306020011 KLETEK NUSA TENGGARA TIMUR 194 Pre-Electrified - - - 124.93719 -9.57387 22066 5306020011 KLETEK NUSA TENGGARA TIMUR 146 Pre-Electrified - - - 124.93679 -9.57658 22067 5306020011 KLETEK NUSA TENGGARA TIMUR 12 Pre-Electrified - - - 124.92627 -9.57762 22068 5306020011 KLETEK NUSA TENGGARA TIMUR 364 Pre-Electrified - - - 124.93639 -9.57972 22069 5306020011 KLETEK NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 124.92749 -9.57942 Annex II – Demand forecast results Page 142 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 22070 5306020011 KLETEK NUSA TENGGARA TIMUR 1 388 Pre-Electrified - - - 124.93881 -9.58243 22071 5306020012 KAMANASA NUSA TENGGARA TIMUR 112 Pre-Electrified - - - 124.92254 -9.53513 22072 5306020012 KAMANASA NUSA TENGGARA TIMUR 724 Pre-Electrified - - - 124.91915 -9.53639 22073 5306020012 KAMANASA NUSA TENGGARA TIMUR 1 264 Pre-Electrified - - - 124.91904 -9.54570 22074 5306020012 KAMANASA NUSA TENGGARA TIMUR 828 Pre-Electrified - - - 124.92095 -9.54726 22075 5306020012 KAMANASA NUSA TENGGARA TIMUR 213 Pre-Electrified - - - 124.92291 -9.54617 22076 5306020012 KAMANASA NUSA TENGGARA TIMUR 772 Pre-Electrified - - - 124.91622 -9.54728 22077 5306020012 KAMANASA NUSA TENGGARA TIMUR 229 Pre-Electrified - - - 124.91381 -9.54816 22078 5306020015 BERELIKU NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 124.93103 -9.59133 22079 5306020015 BERELIKU NUSA TENGGARA TIMUR 115 Pre-Electrified - - - 124.92518 -9.59113 22080 5306020015 BERELIKU NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 124.93501 -9.60102 22081 5306020015 BERELIKU NUSA TENGGARA TIMUR 667 Pre-Electrified - - - 124.93262 -9.59978 22082 5306020016 RAILOR TAHAK NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 124.95821 -9.60060 22083 5306020016 RAILOR TAHAK NUSA TENGGARA TIMUR 90 Pre-Electrified - - - 124.96449 -9.60768 22084 5306020016 RAILOR TAHAK NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.96559 -9.61137 22085 5306020016 RAILOR TAHAK NUSA TENGGARA TIMUR 122 MiniGrid Systems 35 24 605 5.3 124.98606 -9.61480 22086 5306020016 RAILOR TAHAK NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.96360 -9.62018 22087 5306020017 SUAI NUSA TENGGARA TIMUR 896 Pre-Electrified - - - 124.94096 -9.58508 22088 5306020017 SUAI NUSA TENGGARA TIMUR 140 Pre-Electrified - - - 124.94387 -9.58584 22089 5306021003 MANULEA NUSA TENGGARA TIMUR 193 Pre-Electrified - - - 124.85257 -9.47314 22090 5306021003 MANULEA NUSA TENGGARA TIMUR 92 Pre-Electrified - - - 124.85360 -9.47851 22091 5306021003 MANULEA NUSA TENGGARA TIMUR 755 Pre-Electrified - - - 124.85423 -9.48071 22092 5306021003 MANULEA NUSA TENGGARA TIMUR 597 Pre-Electrified - - - 124.85438 -9.49489 22093 5306021003 MANULEA NUSA TENGGARA TIMUR 246 Pre-Electrified - - - 124.85596 -9.49175 22094 5306021003 MANULEA NUSA TENGGARA TIMUR 235 Pre-Electrified - - - 124.85940 -9.49479 22095 5306021004 NAIBONE NUSA TENGGARA TIMUR 2 OffGrid Systems 1 703 0.2 124.82119 -9.49647 22096 5306021007 AS MANULEA NUSA TENGGARA TIMUR 249 Pre-Electrified - - - 124.82445 -9.46792 22097 5306021007 AS MANULEA NUSA TENGGARA TIMUR 58 Pre-Electrified - - - 124.81489 -9.46900 22098 5306021007 AS MANULEA NUSA TENGGARA TIMUR 76 Pre-Electrified - - - 124.82298 -9.47074 22099 5306021007 AS MANULEA NUSA TENGGARA TIMUR 177 Pre-Electrified - - - 124.83198 -9.47073 22100 5306021007 AS MANULEA NUSA TENGGARA TIMUR 108 Pre-Electrified - - - 124.81969 -9.47414 22101 5306021018 UMUTNANA NUSA TENGGARA TIMUR 251 Pre-Electrified - - - 124.84014 -9.47150 22102 5306021018 UMUTNANA NUSA TENGGARA TIMUR 239 Pre-Electrified - - - 124.83595 -9.47390 22103 5306021018 UMUTNANA NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 124.83023 -9.47736 22104 5306021020 NAISAU NUSA TENGGARA TIMUR 46 Pre-Electrified - - - 124.81269 -9.46924 22105 5306021020 NAISAU NUSA TENGGARA TIMUR 5 Pre-Electrified - - - 124.79552 -9.47117 22106 5306021020 NAISAU NUSA TENGGARA TIMUR 111 Pre-Electrified - - - 124.80501 -9.47134 22107 5306022001 KEREANA NUSA TENGGARA TIMUR 121 Pre-Electrified - - - 124.91288 -9.47926 22108 5306022001 KEREANA NUSA TENGGARA TIMUR 129 Pre-Electrified - - - 124.91553 -9.48052 22109 5306022005 BABOTIN NUSA TENGGARA TIMUR 165 Pre-Electrified - - - 124.86088 -9.47304 22110 5306022005 BABOTIN NUSA TENGGARA TIMUR 2 OffGrid Systems 1 703 0.2 124.87495 -9.47323 22111 5306023002 BANI BANI NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.77152 -9.52535 22112 5306023004 KUFEU NUSA TENGGARA TIMUR 74 MiniGrid Systems 18 12 654 2.7 124.79349 -9.51456 22113 5306023005 BIAU NUSA TENGGARA TIMUR 271 Pre-Electrified - - - 124.79679 -9.47613 22114 5306023005 BIAU NUSA TENGGARA TIMUR 283 Pre-Electrified - - - 124.81017 -9.47862 22115 5306023005 BIAU NUSA TENGGARA TIMUR 69 Pre-Electrified - - - 124.80293 -9.48260 22116 5306023006 TUNABESI NUSA TENGGARA TIMUR 3 OffGrid Systems 1 703 0.2 124.77130 -9.49393 22117 5306023007 TUNMAT NUSA TENGGARA TIMUR 6 OffGrid Systems 2 1 406 0.3 124.77123 -9.49407 22118 5306030005 NUMPONI NUSA TENGGARA TIMUR 81 Pre-Electrified - - - 124.89338 -9.45881 22119 5306030005 NUMPONI NUSA TENGGARA TIMUR 106 Pre-Electrified - - - 124.91105 -9.45896 22120 5306030005 NUMPONI NUSA TENGGARA TIMUR 193 Pre-Electrified - - - 124.87777 -9.46195 22121 5306030005 NUMPONI NUSA TENGGARA TIMUR 130 Pre-Electrified - - - 124.91223 -9.46187 22122 5306030005 NUMPONI NUSA TENGGARA TIMUR 256 Pre-Electrified - - - 124.88528 -9.46244 22123 5306030005 NUMPONI NUSA TENGGARA TIMUR 139 Pre-Electrified - - - 124.88973 -9.46334 22124 5306030005 NUMPONI NUSA TENGGARA TIMUR 47 Pre-Electrified - - - 124.90030 -9.46421 22125 5306030005 NUMPONI NUSA TENGGARA TIMUR 263 Pre-Electrified - - - 124.91295 -9.46516 22126 5306030005 NUMPONI NUSA TENGGARA TIMUR 74 Pre-Electrified - - - 124.90113 -9.46630 22127 5306030005 NUMPONI NUSA TENGGARA TIMUR 83 Pre-Electrified - - - 124.89307 -9.46646 22128 5306030005 NUMPONI NUSA TENGGARA TIMUR 194 Pre-Electrified - - - 124.90406 -9.46951 22129 5306030005 NUMPONI NUSA TENGGARA TIMUR 230 Pre-Electrified - - - 124.91263 -9.47121 22130 5306030006 SANLEO NUSA TENGGARA TIMUR 198 Pre-Electrified - - - 124.92705 -9.43602 22131 5306030006 SANLEO NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 124.92797 -9.43270 22132 5306030006 SANLEO NUSA TENGGARA TIMUR 288 Pre-Electrified - - - 124.92095 -9.45115 22133 5306030006 SANLEO NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 124.91857 -9.45732 22134 5306030007 DIRMA NUSA TENGGARA TIMUR 946 Pre-Electrified - - - 124.92421 -9.43547 22135 5306030007 DIRMA NUSA TENGGARA TIMUR 44 Pre-Electrified - - - 124.92759 -9.43254 22136 5306030007 DIRMA NUSA TENGGARA TIMUR 64 Pre-Electrified - - - 124.91515 -9.43703 22137 5306030007 DIRMA NUSA TENGGARA TIMUR 126 Pre-Electrified - - - 124.92015 -9.44548 22138 5306030013 KUSA NUSA TENGGARA TIMUR 86 MiniGrid Systems 25 17 575 3.8 124.86425 -9.38925 22139 5306030013 KUSA NUSA TENGGARA TIMUR 10 Pre-Electrified - - - 124.87480 -9.39221 22140 5306030013 KUSA NUSA TENGGARA TIMUR 156 Pre-Electrified - - - 124.87670 -9.38842 22141 5306030013 KUSA NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 124.87546 -9.39208 22142 5306030013 KUSA NUSA TENGGARA TIMUR 79 Pre-Electrified - - - 124.89279 -9.39375 22143 5306030013 KUSA NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 124.87612 -9.39492 22144 5306030013 KUSA NUSA TENGGARA TIMUR 185 Pre-Electrified - - - 124.88519 -9.39507 22145 5306030013 KUSA NUSA TENGGARA TIMUR 133 Pre-Electrified - - - 124.87899 -9.40205 22146 5306030013 KUSA NUSA TENGGARA TIMUR 615 Pre-Electrified - - - 124.88698 -9.40379 22147 5306030013 KUSA NUSA TENGGARA TIMUR 20 Pre-Electrified - - - 124.89234 -9.40922 22148 5306030013 KUSA NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 124.89096 -9.41005 22149 5306030013 KUSA NUSA TENGGARA TIMUR 31 Pre-Electrified - - - 124.89150 -9.41107 22150 5306030014 WEMEDA NUSA TENGGARA TIMUR 108 Pre-Electrified - - - 124.90263 -9.41133 22151 5306030014 WEMEDA NUSA TENGGARA TIMUR 503 Pre-Electrified - - - 124.90537 -9.41499 22152 5306030014 WEMEDA NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 124.90281 -9.41580 22153 5306030014 WEMEDA NUSA TENGGARA TIMUR 15 Pre-Electrified - - - 124.91815 -9.42151 22154 5306030014 WEMEDA NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 124.91909 -9.42516 Annex II – Demand forecast results Page 143 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 22155 5306030014 WEMEDA NUSA TENGGARA TIMUR 134 Pre-Electrified - - - 124.89892 -9.41241 22156 5306030014 WEMEDA NUSA TENGGARA TIMUR 151 Pre-Electrified - - - 124.90933 -9.42570 22157 5306031002 TNIUMANU NUSA TENGGARA TIMUR 76 Pre-Electrified - - - 124.82285 -9.42277 22158 5306031002 TNIUMANU NUSA TENGGARA TIMUR 168 Pre-Electrified - - - 124.81976 -9.43660 22159 5306031002 TNIUMANU NUSA TENGGARA TIMUR 244 Pre-Electrified - - - 124.82161 -9.42740 22160 5306031003 UABAU NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.82295 -9.42348 22161 5306031003 UABAU NUSA TENGGARA TIMUR 84 Pre-Electrified - - - 124.83565 -9.43474 22162 5306031003 UABAU NUSA TENGGARA TIMUR 307 Pre-Electrified - - - 124.84805 -9.43922 22163 5306031003 UABAU NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 124.86465 -9.43808 22164 5306031003 UABAU NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 124.86754 -9.43810 22165 5306031003 UABAU NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 124.85983 -9.44239 22166 5306031003 UABAU NUSA TENGGARA TIMUR 89 Pre-Electrified - - - 124.86729 -9.44325 22167 5306031003 UABAU NUSA TENGGARA TIMUR 218 Pre-Electrified - - - 124.83233 -9.45356 22168 5306031003 UABAU NUSA TENGGARA TIMUR 101 Pre-Electrified - - - 124.83737 -9.45522 22169 5306031004 BONIBAIS NUSA TENGGARA TIMUR 172 Pre-Electrified - - - 124.89375 -9.44669 22170 5306031004 BONIBAIS NUSA TENGGARA TIMUR 370 Pre-Electrified - - - 124.89228 -9.45315 22171 5306031004 BONIBAIS NUSA TENGGARA TIMUR 500 Pre-Electrified - - - 124.88442 -9.45350 22172 5306031004 BONIBAIS NUSA TENGGARA TIMUR 172 Pre-Electrified - - - 124.88098 -9.45469 22173 5306031005 NAEKEKUSA NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 124.87827 -9.44146 22174 5306031005 NAEKEKUSA NUSA TENGGARA TIMUR 147 Pre-Electrified - - - 124.88307 -9.44356 22175 5306031005 NAEKEKUSA NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 124.88032 -9.44411 22176 5306031006 KAPITANMEO NUSA TENGGARA TIMUR 214 Pre-Electrified - - - 124.82265 -9.40260 22177 5306031006 KAPITANMEO NUSA TENGGARA TIMUR 122 Pre-Electrified - - - 124.81920 -9.40681 22178 5306031006 KAPITANMEO NUSA TENGGARA TIMUR 214 Pre-Electrified - - - 124.82361 -9.40918 22179 5306031007 TESA NUSA TENGGARA TIMUR 310 Pre-Electrified - - - 124.81115 -9.37590 22180 5306031007 TESA NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 124.81463 -9.37568 22181 5306031007 TESA NUSA TENGGARA TIMUR 121 Pre-Electrified - - - 124.80409 -9.38298 22182 5306031007 TESA NUSA TENGGARA TIMUR 109 Pre-Electrified - - - 124.83518 -9.35435 22183 5306031007 TESA NUSA TENGGARA TIMUR 7 Pre-Electrified - - - 124.81334 -9.36443 22184 5306031007 TESA NUSA TENGGARA TIMUR 340 Pre-Electrified - - - 124.83592 -9.36404 22185 5306031007 TESA NUSA TENGGARA TIMUR 203 Pre-Electrified - - - 124.81393 -9.36670 22186 5306031007 TESA NUSA TENGGARA TIMUR 270 Pre-Electrified - - - 124.81573 -9.37316 22187 5306031007 TESA NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 124.81182 -9.37258 22188 5306031007 TESA NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 124.81890 -9.37235 22189 5306031007 TESA NUSA TENGGARA TIMUR 91 Pre-Electrified - - - 124.82087 -9.37321 22190 5306031007 TESA NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 124.81322 -9.37483 22191 5306031008 MEOTROY NUSA TENGGARA TIMUR 1 507 Pre-Electrified - - - 124.81748 -9.35831 22192 5306031009 BESESMUS NUSA TENGGARA TIMUR 525 Pre-Electrified - - - 124.83869 -9.45574 22193 5306031010 OENAEK NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 124.86210 -9.43034 22194 5306031010 OENAEK NUSA TENGGARA TIMUR 170 Pre-Electrified - - - 124.86663 -9.43316 22195 5306031010 OENAEK NUSA TENGGARA TIMUR 96 Pre-Electrified - - - 124.86496 -9.43743 22196 5306031010 OENAEK NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.86716 -9.43777 22197 5306031010 OENAEK NUSA TENGGARA TIMUR 232 Pre-Electrified - - - 124.87133 -9.43874 22198 5306031010 OENAEK NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 124.87261 -9.44373 22199 5306032001 TASAIN NUSA TENGGARA TIMUR 53 Pre-Electrified - - - 124.86622 -9.37762 22200 5306032001 TASAIN NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 124.87331 -9.34702 22201 5306032001 TASAIN NUSA TENGGARA TIMUR 273 Pre-Electrified - - - 124.84319 -9.35015 22202 5306032001 TASAIN NUSA TENGGARA TIMUR 95 MiniGrid Systems 26 18 278 3.9 124.85478 -9.36188 22203 5306032001 TASAIN NUSA TENGGARA TIMUR 229 Pre-Electrified - - - 124.86837 -9.36442 22204 5306032002 TEUN NUSA TENGGARA TIMUR 430 Pre-Electrified - - - 124.87748 -9.38212 22205 5306032002 TEUN NUSA TENGGARA TIMUR 257 Pre-Electrified - - - 124.88229 -9.38513 22206 5306032002 TEUN NUSA TENGGARA TIMUR 353 Pre-Electrified - - - 124.88289 -9.38990 22207 5306032002 TEUN NUSA TENGGARA TIMUR 278 Pre-Electrified - - - 124.87445 -9.35754 22208 5306032002 TEUN NUSA TENGGARA TIMUR 31 Pre-Electrified - - - 124.87512 -9.35862 22209 5306032002 TEUN NUSA TENGGARA TIMUR 163 Pre-Electrified - - - 124.87595 -9.36000 22210 5306032002 TEUN NUSA TENGGARA TIMUR 230 Pre-Electrified - - - 124.87735 -9.36273 22211 5306032002 TEUN NUSA TENGGARA TIMUR 113 Pre-Electrified - - - 124.87587 -9.36444 22212 5306032006 RAFAE NUSA TENGGARA TIMUR 156 Pre-Electrified - - - 124.86331 -9.32157 22213 5306032006 RAFAE NUSA TENGGARA TIMUR 626 Pre-Electrified - - - 124.87245 -9.33179 22214 5306032006 RAFAE NUSA TENGGARA TIMUR 23 Pre-Electrified - - - 124.87379 -9.34691 22215 5306032006 RAFAE NUSA TENGGARA TIMUR 58 Pre-Electrified - - - 124.86919 -9.31996 22216 5306032006 RAFAE NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.85477 -9.34298 22217 5306032006 RAFAE NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 124.87519 -9.32960 22218 5306032007 DUAKORAN NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 124.87840 -9.31465 22219 5306032007 DUAKORAN NUSA TENGGARA TIMUR 15 Pre-Electrified - - - 124.87763 -9.31634 22220 5306032008 MANDEU NUSA TENGGARA TIMUR 133 Pre-Electrified - - - 124.87069 -9.30971 22221 5306032008 MANDEU NUSA TENGGARA TIMUR 1 386 Pre-Electrified - - - 124.87075 -9.31385 22222 5306032008 MANDEU NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 124.85548 -9.31196 22223 5306032008 MANDEU NUSA TENGGARA TIMUR 154 Pre-Electrified - - - 124.86656 -9.30604 22224 5306032008 MANDEU NUSA TENGGARA TIMUR 598 Pre-Electrified - - - 124.87291 -9.30701 22225 5306032008 MANDEU NUSA TENGGARA TIMUR 25 Pre-Electrified - - - 124.86891 -9.31914 22226 5306032008 MANDEU NUSA TENGGARA TIMUR 46 Pre-Electrified - - - 124.87729 -9.31651 22227 5306032009 LEUNTOLU NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 124.85564 -9.29888 22228 5306032009 LEUNTOLU NUSA TENGGARA TIMUR 1 386 Pre-Electrified - - - 124.85062 -9.30334 22229 5306032009 LEUNTOLU NUSA TENGGARA TIMUR 710 Pre-Electrified - - - 124.85105 -9.31421 22230 5306032009 LEUNTOLU NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 124.85496 -9.31177 22231 5306032009 LEUNTOLU NUSA TENGGARA TIMUR 64 Pre-Electrified - - - 124.84232 -9.33186 22232 5306032009 LEUNTOLU NUSA TENGGARA TIMUR 125 Pre-Electrified - - - 124.85094 -9.30791 22233 5306032009 LEUNTOLU NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 124.84850 -9.32051 22234 5306040001 LAKEKUN BARAT NUSA TENGGARA TIMUR 113 Pre-Electrified - - - 124.94480 -9.52015 22235 5306040001 LAKEKUN BARAT NUSA TENGGARA TIMUR 106 Pre-Electrified - - - 124.94732 -9.52074 22236 5306040001 LAKEKUN BARAT NUSA TENGGARA TIMUR 1 601 Pre-Electrified - - - 124.93348 -9.52754 22237 5306040001 LAKEKUN BARAT NUSA TENGGARA TIMUR 525 Pre-Electrified - - - 124.92750 -9.53354 22238 5306040001 LAKEKUN BARAT NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 124.92451 -9.53493 22239 5306040002 LAKEKUN NUSA TENGGARA TIMUR 2 199 Pre-Electrified - - - 124.95820 -9.51682 Annex II – Demand forecast results Page 144 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 22240 5306040004 LITAMALI NUSA TENGGARA TIMUR 352 Pre-Electrified - - - 124.98857 -9.50583 22241 5306040004 LITAMALI NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 124.98571 -9.50657 22242 5306040004 LITAMALI NUSA TENGGARA TIMUR 273 Pre-Electrified - - - 125.01554 -9.50054 22243 5306040004 LITAMALI NUSA TENGGARA TIMUR 44 Pre-Electrified - - - 125.01092 -9.50033 22244 5306040004 LITAMALI NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 125.01086 -9.50176 22245 5306040004 LITAMALI NUSA TENGGARA TIMUR 29 Pre-Electrified - - - 125.00942 -9.50276 22246 5306040004 LITAMALI NUSA TENGGARA TIMUR 319 Pre-Electrified - - - 125.00608 -9.50348 22247 5306040004 LITAMALI NUSA TENGGARA TIMUR 52 MiniGrid Systems 12 8 436 1.8 125.02402 -9.50786 22248 5306040004 LITAMALI NUSA TENGGARA TIMUR 510 Pre-Electrified - - - 125.01442 -9.49334 22249 5306040004 LITAMALI NUSA TENGGARA TIMUR 602 Pre-Electrified - - - 125.02619 -9.49548 22250 5306040004 LITAMALI NUSA TENGGARA TIMUR 674 Pre-Electrified - - - 125.01709 -9.49680 22251 5306040004 LITAMALI NUSA TENGGARA TIMUR 85 Pre-Electrified - - - 125.01728 -9.49890 22252 5306040004 LITAMALI NUSA TENGGARA TIMUR 75 Pre-Electrified - - - 125.01171 -9.49949 22253 5306040004 LITAMALI NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 125.03137 -9.49387 22254 5306040005 SISI NUSA TENGGARA TIMUR 6 OffGrid Systems 2 1 406 0.3 125.02093 -9.44919 22255 5306040005 SISI NUSA TENGGARA TIMUR 69 MiniGrid Systems 19 13 357 2.9 125.02109 -9.45058 22256 5306040005 SISI NUSA TENGGARA TIMUR 15 OffGrid Systems 5 3 515 0.8 125.01950 -9.45331 22257 5306040005 SISI NUSA TENGGARA TIMUR 111 Pre-Electrified - - - 125.00216 -9.46511 22258 5306040005 SISI NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 125.00079 -9.46556 22259 5306040005 SISI NUSA TENGGARA TIMUR 530 Pre-Electrified - - - 125.01097 -9.47194 22260 5306040005 SISI NUSA TENGGARA TIMUR 34 Pre-Electrified - - - 125.01477 -9.47523 22261 5306040006 RAINAWE NUSA TENGGARA TIMUR 553 Pre-Electrified - - - 125.05139 -9.46047 22262 5306040006 RAINAWE NUSA TENGGARA TIMUR 239 Pre-Electrified - - - 125.05419 -9.47483 22263 5306040006 RAINAWE NUSA TENGGARA TIMUR 1 773 Pre-Electrified - - - 125.05551 -9.47719 22264 5306040006 RAINAWE NUSA TENGGARA TIMUR 483 Pre-Electrified - - - 125.04496 -9.48840 22265 5306040008 BABULU SELATAN NUSA TENGGARA TIMUR 352 Pre-Electrified - - - 124.98786 -9.42870 22266 5306040008 BABULU SELATAN NUSA TENGGARA TIMUR 444 Pre-Electrified - - - 124.98231 -9.43230 22267 5306040008 BABULU SELATAN NUSA TENGGARA TIMUR 221 Pre-Electrified - - - 124.98861 -9.44468 22268 5306040009 BABULU NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 124.96165 -9.41831 22269 5306040009 BABULU NUSA TENGGARA TIMUR 174 Pre-Electrified - - - 124.95743 -9.41879 22270 5306040009 BABULU NUSA TENGGARA TIMUR 140 Pre-Electrified - - - 124.95308 -9.42371 22271 5306040009 BABULU NUSA TENGGARA TIMUR 110 Pre-Electrified - - - 124.94893 -9.42411 22272 5306040009 BABULU NUSA TENGGARA TIMUR 17 Pre-Electrified - - - 124.94270 -9.42632 22273 5306040009 BABULU NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 124.95433 -9.42734 22274 5306040009 BABULU NUSA TENGGARA TIMUR 12 Pre-Electrified - - - 124.93965 -9.42707 22275 5306040009 BABULU NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 124.95402 -9.43109 22276 5306041001 ALAS SELATAN NUSA TENGGARA TIMUR 488 Pre-Electrified - - - 125.04565 -9.40533 22277 5306041001 ALAS SELATAN NUSA TENGGARA TIMUR 205 Pre-Electrified - - - 125.04641 -9.40999 22278 5306041001 ALAS SELATAN NUSA TENGGARA TIMUR 16 Pre-Electrified - - - 125.04483 -9.41618 22279 5306041001 ALAS SELATAN NUSA TENGGARA TIMUR 153 Pre-Electrified - - - 125.04274 -9.41877 22280 5306041001 ALAS SELATAN NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 125.04205 -9.42744 22281 5306041001 ALAS SELATAN NUSA TENGGARA TIMUR 285 Pre-Electrified - - - 125.04255 -9.43015 22282 5306041001 ALAS SELATAN NUSA TENGGARA TIMUR 117 Pre-Electrified - - - 125.04238 -9.43320 22283 5306041001 ALAS SELATAN NUSA TENGGARA TIMUR 26 Pre-Electrified - - - 125.04286 -9.43457 22284 5306041001 ALAS SELATAN NUSA TENGGARA TIMUR 52 MiniGrid Systems 15 10 545 2.3 125.08180 -9.45403 22285 5306041001 ALAS SELATAN NUSA TENGGARA TIMUR 415 Pre-Electrified - - - 125.05494 -9.45731 22286 5306041001 ALAS SELATAN NUSA TENGGARA TIMUR 22 Pre-Electrified - - - 125.06975 -9.46102 22287 5306041001 ALAS SELATAN NUSA TENGGARA TIMUR 401 Pre-Electrified - - - 125.06864 -9.46340 22288 5306041001 ALAS SELATAN NUSA TENGGARA TIMUR 164 Pre-Electrified - - - 125.04467 -9.41300 22289 5306041003 ALAS NUSA TENGGARA TIMUR 24 Pre-Electrified - - - 125.03828 -9.39209 22290 5306041003 ALAS NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 125.03699 -9.39233 22291 5306041003 ALAS NUSA TENGGARA TIMUR 24 Pre-Electrified - - - 125.04485 -9.39286 22292 5306041003 ALAS NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 125.04284 -9.39298 22293 5306041003 ALAS NUSA TENGGARA TIMUR 475 Pre-Electrified - - - 125.04063 -9.39367 22294 5306041003 ALAS NUSA TENGGARA TIMUR 26 Pre-Electrified - - - 125.03775 -9.39404 22295 5306041003 ALAS NUSA TENGGARA TIMUR 144 Pre-Electrified - - - 125.04270 -9.39663 22296 5306041003 ALAS NUSA TENGGARA TIMUR 315 Pre-Electrified - - - 125.04522 -9.39058 22297 5306041004 ALAS UTARA NUSA TENGGARA TIMUR 51 MiniGrid Systems 15 10 545 2.3 125.00681 -9.32581 22298 5306041004 ALAS UTARA NUSA TENGGARA TIMUR 82 MiniGrid Systems 23 16 169 3.5 125.00429 -9.32853 22299 5306050001 RINBESIHAT NUSA TENGGARA TIMUR 11 Pre-Electrified - - - 124.85900 -9.27525 22300 5306050001 RINBESIHAT NUSA TENGGARA TIMUR 753 Pre-Electrified - - - 124.86332 -9.27629 22301 5306050001 RINBESIHAT NUSA TENGGARA TIMUR 241 Pre-Electrified - - - 124.85752 -9.28215 22302 5306050001 RINBESIHAT NUSA TENGGARA TIMUR 747 Pre-Electrified - - - 124.85503 -9.28925 22303 5306050001 RINBESIHAT NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 124.85903 -9.29303 22304 5306050001 RINBESIHAT NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.84696 -9.30252 22305 5306050002 NAITIMU NUSA TENGGARA TIMUR 978 Pre-Electrified - - - 124.87056 -9.27044 22306 5306050002 NAITIMU NUSA TENGGARA TIMUR 464 Pre-Electrified - - - 124.87432 -9.27453 22307 5306050002 NAITIMU NUSA TENGGARA TIMUR 227 Pre-Electrified - - - 124.88511 -9.27295 22308 5306050002 NAITIMU NUSA TENGGARA TIMUR 761 Pre-Electrified - - - 124.87688 -9.27580 22309 5306050002 NAITIMU NUSA TENGGARA TIMUR 328 Pre-Electrified - - - 124.88187 -9.27396 22310 5306050002 NAITIMU NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 124.87923 -9.27620 22311 5306050002 NAITIMU NUSA TENGGARA TIMUR 697 Pre-Electrified - - - 124.88357 -9.27657 22312 5306050002 NAITIMU NUSA TENGGARA TIMUR 211 Pre-Electrified - - - 124.88111 -9.27817 22313 5306050002 NAITIMU NUSA TENGGARA TIMUR 130 Pre-Electrified - - - 124.87681 -9.28093 22314 5306050004 LAWALUTOLUS NUSA TENGGARA TIMUR 33 MiniGrid Systems 8 5 624 1.2 124.90379 -9.29867 22315 5306050009 DEROK FATURENE NUSA TENGGARA TIMUR 83 MiniGrid Systems 19 13 357 2.9 124.92647 -9.19660 22316 5306050010 BAKUSTULAMA NUSA TENGGARA TIMUR 385 Pre-Electrified - - - 124.86401 -9.24438 22317 5306050010 BAKUSTULAMA NUSA TENGGARA TIMUR 4 OffGrid Systems 1 703 0.2 124.87744 -9.24995 22318 5306050011 NAEKASA NUSA TENGGARA TIMUR 124 Pre-Electrified - - - 124.87442 -9.21594 22319 5306050011 NAEKASA NUSA TENGGARA TIMUR 476 Pre-Electrified - - - 124.87364 -9.21874 22320 5306050011 NAEKASA NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 124.86954 -9.22494 22321 5306050011 NAEKASA NUSA TENGGARA TIMUR 309 Pre-Electrified - - - 124.85998 -9.23661 22322 5306050011 NAEKASA NUSA TENGGARA TIMUR 164 Pre-Electrified - - - 124.85643 -9.14602 22323 5306050011 NAEKASA NUSA TENGGARA TIMUR 231 Pre-Electrified - - - 124.85613 -9.14322 22324 5306050011 NAEKASA NUSA TENGGARA TIMUR 105 Pre-Electrified - - - 124.89726 -9.16902 Annex II – Demand forecast results Page 145 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 22325 5306050011 NAEKASA NUSA TENGGARA TIMUR 409 Pre-Electrified - - - 124.89699 -9.17397 22326 5306050011 NAEKASA NUSA TENGGARA TIMUR 96 Pre-Electrified - - - 124.89426 -9.17872 22327 5306050011 NAEKASA NUSA TENGGARA TIMUR 7 Pre-Electrified - - - 124.89340 -9.16996 22328 5306050011 NAEKASA NUSA TENGGARA TIMUR 898 Pre-Electrified - - - 124.89437 -9.16485 22329 5306050011 NAEKASA NUSA TENGGARA TIMUR 134 Pre-Electrified - - - 124.89075 -9.16729 22330 5306050011 NAEKASA NUSA TENGGARA TIMUR 904 Pre-Electrified - - - 124.89352 -9.17147 22331 5306050011 NAEKASA NUSA TENGGARA TIMUR 101 Pre-Electrified - - - 124.88929 -9.17936 22332 5306050011 NAEKASA NUSA TENGGARA TIMUR 282 Pre-Electrified - - - 124.89030 -9.16123 22333 5306050011 NAEKASA NUSA TENGGARA TIMUR 569 Pre-Electrified - - - 124.88882 -9.17433 22334 5306050011 NAEKASA NUSA TENGGARA TIMUR 743 Pre-Electrified - - - 124.88785 -9.18322 22335 5306050011 NAEKASA NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 124.88370 -9.19055 22336 5306050011 NAEKASA NUSA TENGGARA TIMUR 516 Pre-Electrified - - - 124.88527 -9.17613 22337 5306050011 NAEKASA NUSA TENGGARA TIMUR 497 Pre-Electrified - - - 124.87982 -9.20053 22338 5306050011 NAEKASA NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 124.87540 -9.21533 22339 5306050012 TUKUNENO NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 124.87054 -9.15908 22340 5306050012 TUKUNENO NUSA TENGGARA TIMUR 1 092 Pre-Electrified - - - 124.86390 -9.16200 22341 5306050012 TUKUNENO NUSA TENGGARA TIMUR 427 Pre-Electrified - - - 124.85887 -9.13610 22342 5306050012 TUKUNENO NUSA TENGGARA TIMUR 310 Pre-Electrified - - - 124.85671 -9.16131 22343 5306050012 TUKUNENO NUSA TENGGARA TIMUR 326 Pre-Electrified - - - 124.84070 -9.13202 22344 5306050012 TUKUNENO NUSA TENGGARA TIMUR 89 MiniGrid Systems 22 15 466 3.3 124.82919 -9.19621 22345 5306050012 TUKUNENO NUSA TENGGARA TIMUR 84 Pre-Electrified - - - 124.82791 -9.12594 22346 5306050012 TUKUNENO NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 124.88195 -9.13835 22347 5306050012 TUKUNENO NUSA TENGGARA TIMUR 89 Pre-Electrified - - - 124.83342 -9.12200 22348 5306050012 TUKUNENO NUSA TENGGARA TIMUR 383 Pre-Electrified - - - 124.83312 -9.11546 22349 5306050012 TUKUNENO NUSA TENGGARA TIMUR 207 Pre-Electrified - - - 124.82822 -9.12430 22350 5306051001 FATUKETY NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 124.83780 -9.04938 22351 5306051001 FATUKETY NUSA TENGGARA TIMUR 199 Pre-Electrified - - - 124.82640 -9.04366 22352 5306051001 FATUKETY NUSA TENGGARA TIMUR 200 Pre-Electrified - - - 124.82518 -9.05917 22353 5306051001 FATUKETY NUSA TENGGARA TIMUR 409 Pre-Electrified - - - 124.81571 -9.05214 22354 5306051001 FATUKETY NUSA TENGGARA TIMUR 190 Pre-Electrified - - - 124.81498 -9.06113 22355 5306051001 FATUKETY NUSA TENGGARA TIMUR 964 Pre-Electrified - - - 124.80686 -9.05402 22356 5306051002 KABUNA NUSA TENGGARA TIMUR 918 Pre-Electrified - - - 124.92014 -9.05444 22357 5306051002 KABUNA NUSA TENGGARA TIMUR 144 Pre-Electrified - - - 124.91592 -9.08242 22358 5306051002 KABUNA NUSA TENGGARA TIMUR 363 Pre-Electrified - - - 124.91762 -9.06294 22359 5306051002 KABUNA NUSA TENGGARA TIMUR 387 Pre-Electrified - - - 124.91688 -9.05279 22360 5306051002 KABUNA NUSA TENGGARA TIMUR 1 077 Pre-Electrified - - - 124.91376 -9.07599 22361 5306051002 KABUNA NUSA TENGGARA TIMUR 94 Pre-Electrified - - - 124.91177 -9.07217 22362 5306051002 KABUNA NUSA TENGGARA TIMUR 96 Pre-Electrified - - - 124.91019 -9.06983 22363 5306051002 KABUNA NUSA TENGGARA TIMUR 505 Pre-Electrified - - - 124.90985 -9.06748 22364 5306051002 KABUNA NUSA TENGGARA TIMUR 258 Pre-Electrified - - - 124.89466 -9.05508 22365 5306051002 KABUNA NUSA TENGGARA TIMUR 736 Pre-Electrified - - - 124.88942 -9.04153 22366 5306051003 KENEBIBI NUSA TENGGARA TIMUR 349 Pre-Electrified - - - 124.88758 -8.97789 22367 5306051003 KENEBIBI NUSA TENGGARA TIMUR 2 451 Pre-Electrified - - - 124.88207 -8.98255 22368 5306051004 JENILU NUSA TENGGARA TIMUR 92 Pre-Electrified - - - 124.86862 -9.00561 22369 5306051004 JENILU NUSA TENGGARA TIMUR 258 Pre-Electrified - - - 124.86721 -9.00870 22370 5306051004 JENILU NUSA TENGGARA TIMUR 90 Pre-Electrified - - - 124.86481 -9.00066 22371 5306051004 JENILU NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 124.85842 -9.00039 22372 5306051004 JENILU NUSA TENGGARA TIMUR 1 638 Pre-Electrified - - - 124.86797 -8.99412 22373 5306051004 JENILU NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 124.85840 -8.99981 22374 5306051004 JENILU NUSA TENGGARA TIMUR 189 Pre-Electrified - - - 124.87780 -8.98565 22375 5306051005 LEOSAMA NUSA TENGGARA TIMUR 743 Pre-Electrified - - - 124.85350 -9.03641 22376 5306051005 LEOSAMA NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 124.84426 -9.05476 22377 5306051005 LEOSAMA NUSA TENGGARA TIMUR 523 Pre-Electrified - - - 124.84219 -9.04892 22378 5306051006 DUALAUS NUSA TENGGARA TIMUR 140 Pre-Electrified - - - 124.84320 -9.00704 22379 5306051006 DUALAUS NUSA TENGGARA TIMUR 772 Pre-Electrified - - - 124.84342 -9.02801 22380 5306051006 DUALAUS NUSA TENGGARA TIMUR 107 Pre-Electrified - - - 124.84177 -9.00914 22381 5306051006 DUALAUS NUSA TENGGARA TIMUR 571 Pre-Electrified - - - 124.83929 -9.01719 22382 5306051006 DUALAUS NUSA TENGGARA TIMUR 2 349 Pre-Electrified - - - 124.83707 -9.03781 22383 5306051006 DUALAUS NUSA TENGGARA TIMUR 85 Pre-Electrified - - - 124.81778 -9.00387 22384 5306060005 FATUBENAO NUSA TENGGARA TIMUR 282 Pre-Electrified - - - 124.92401 -9.12036 22385 5306060005 FATUBENAO NUSA TENGGARA TIMUR 90 Pre-Electrified - - - 124.92010 -9.12227 22386 5306060005 FATUBENAO NUSA TENGGARA TIMUR 123 Pre-Electrified - - - 124.90772 -9.10907 22387 5306060005 FATUBENAO NUSA TENGGARA TIMUR 356 Pre-Electrified - - - 124.90745 -9.11152 22388 5306060005 FATUBENAO NUSA TENGGARA TIMUR 668 Pre-Electrified - - - 124.90753 -9.08962 22389 5306060005 FATUBENAO NUSA TENGGARA TIMUR 105 Pre-Electrified - - - 124.90551 -9.10709 22390 5306060005 FATUBENAO NUSA TENGGARA TIMUR 641 Pre-Electrified - - - 124.90498 -9.10538 22391 5306060005 FATUBENAO NUSA TENGGARA TIMUR 286 Pre-Electrified - - - 124.90514 -9.11332 22392 5306060005 FATUBENAO NUSA TENGGARA TIMUR 190 Pre-Electrified - - - 124.90446 -9.11705 22393 5306060005 FATUBENAO NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 124.90168 -9.08525 22394 5306060005 FATUBENAO NUSA TENGGARA TIMUR 3 962 Pre-Electrified - - - 124.90047 -9.11149 22395 5306060005 FATUBENAO NUSA TENGGARA TIMUR 471 Pre-Electrified - - - 124.89745 -9.11128 22396 5306060005 FATUBENAO NUSA TENGGARA TIMUR 169 Pre-Electrified - - - 124.90919 -9.10022 22397 5306060005 FATUBENAO NUSA TENGGARA TIMUR 139 Pre-Electrified - - - 124.90852 -9.09773 22398 5306060005 FATUBENAO NUSA TENGGARA TIMUR 161 Pre-Electrified - - - 124.90708 -9.09592 22399 5306060005 FATUBENAO NUSA TENGGARA TIMUR 351 Pre-Electrified - - - 124.90663 -9.09947 22400 5306060005 FATUBENAO NUSA TENGGARA TIMUR 216 Pre-Electrified - - - 124.90498 -9.09567 22401 5306060006 ATAMBUA NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.90121 -9.10736 22402 5306060006 ATAMBUA NUSA TENGGARA TIMUR 3 517 Pre-Electrified - - - 124.89853 -9.10603 22403 5306060011 MANUMUTIN NUSA TENGGARA TIMUR 515 Pre-Electrified - - - 124.90767 -9.08281 22404 5306060011 MANUMUTIN NUSA TENGGARA TIMUR 172 Pre-Electrified - - - 124.90669 -9.07582 22405 5306060011 MANUMUTIN NUSA TENGGARA TIMUR 83 Pre-Electrified - - - 124.90545 -9.07988 22406 5306060011 MANUMUTIN NUSA TENGGARA TIMUR 1 238 Pre-Electrified - - - 124.90421 -9.08489 22407 5306060011 MANUMUTIN NUSA TENGGARA TIMUR 324 Pre-Electrified - - - 124.90151 -9.08162 22408 5306060011 MANUMUTIN NUSA TENGGARA TIMUR 794 Pre-Electrified - - - 124.89657 -9.08093 22409 5306060011 MANUMUTIN NUSA TENGGARA TIMUR 1 158 Pre-Electrified - - - 124.89260 -9.08421 Annex II – Demand forecast results Page 146 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 22410 5306060011 MANUMUTIN NUSA TENGGARA TIMUR 202 Pre-Electrified - - - 124.89073 -9.08146 22411 5306060011 MANUMUTIN NUSA TENGGARA TIMUR 1 909 Pre-Electrified - - - 124.89104 -9.09147 22412 5306060011 MANUMUTIN NUSA TENGGARA TIMUR 3 718 Pre-Electrified - - - 124.89570 -9.08843 22413 5306060012 TENUKIIK NUSA TENGGARA TIMUR 4 798 Pre-Electrified - - - 124.89760 -9.09554 22414 5306061001 BEIRAFU NUSA TENGGARA TIMUR 83 Pre-Electrified - - - 124.88250 -9.10237 22415 5306061001 BEIRAFU NUSA TENGGARA TIMUR 5 471 Pre-Electrified - - - 124.88902 -9.10574 22416 5306061002 BERDAO NUSA TENGGARA TIMUR 4 164 Pre-Electrified - - - 124.89441 -9.10491 22417 5306061003 TULAMALAE NUSA TENGGARA TIMUR 451 Pre-Electrified - - - 124.89012 -9.09251 22418 5306061003 TULAMALAE NUSA TENGGARA TIMUR 709 Pre-Electrified - - - 124.88435 -9.09469 22419 5306061003 TULAMALAE NUSA TENGGARA TIMUR 164 Pre-Electrified - - - 124.88301 -9.10152 22420 5306061003 TULAMALAE NUSA TENGGARA TIMUR 3 528 Pre-Electrified - - - 124.88544 -9.09922 22421 5306061003 TULAMALAE NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 124.88093 -9.09640 22422 5306061004 UMANEN NUSA TENGGARA TIMUR 89 Pre-Electrified - - - 124.87467 -9.10613 22423 5306061004 UMANEN NUSA TENGGARA TIMUR 116 Pre-Electrified - - - 124.87468 -9.09350 22424 5306061004 UMANEN NUSA TENGGARA TIMUR 202 Pre-Electrified - - - 124.87339 -9.10590 22425 5306061004 UMANEN NUSA TENGGARA TIMUR 139 Pre-Electrified - - - 124.87422 -9.10933 22426 5306061004 UMANEN NUSA TENGGARA TIMUR 695 Pre-Electrified - - - 124.87350 -9.10355 22427 5306061004 UMANEN NUSA TENGGARA TIMUR 1 124 Pre-Electrified - - - 124.87083 -9.09250 22428 5306061004 UMANEN NUSA TENGGARA TIMUR 1 456 Pre-Electrified - - - 124.86468 -9.08967 22429 5306061004 UMANEN NUSA TENGGARA TIMUR 259 Pre-Electrified - - - 124.86128 -9.09111 22430 5306061004 UMANEN NUSA TENGGARA TIMUR 162 Pre-Electrified - - - 124.86055 -9.08646 22431 5306061004 UMANEN NUSA TENGGARA TIMUR 87 Pre-Electrified - - - 124.87849 -9.10336 22432 5306061004 UMANEN NUSA TENGGARA TIMUR 462 Pre-Electrified - - - 124.87912 -9.10077 22433 5306061004 UMANEN NUSA TENGGARA TIMUR 439 Pre-Electrified - - - 124.87953 -9.10461 22434 5306061004 UMANEN NUSA TENGGARA TIMUR 272 Pre-Electrified - - - 124.87587 -9.10620 22435 5306061004 UMANEN NUSA TENGGARA TIMUR 1 276 Pre-Electrified - - - 124.87781 -9.09498 22436 5306061004 UMANEN NUSA TENGGARA TIMUR 16 Pre-Electrified - - - 124.87509 -9.10968 22437 5306061004 UMANEN NUSA TENGGARA TIMUR 128 Pre-Electrified - - - 124.87549 -9.10255 22438 5306062001 FATUKBOT NUSA TENGGARA TIMUR 105 Pre-Electrified - - - 124.89953 -9.13904 22439 5306062001 FATUKBOT NUSA TENGGARA TIMUR 210 Pre-Electrified - - - 124.89857 -9.12595 22440 5306062001 FATUKBOT NUSA TENGGARA TIMUR 231 Pre-Electrified - - - 124.89834 -9.12882 22441 5306062001 FATUKBOT NUSA TENGGARA TIMUR 9 Pre-Electrified - - - 124.89722 -9.12833 22442 5306062001 FATUKBOT NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 124.89431 -9.14072 22443 5306062001 FATUKBOT NUSA TENGGARA TIMUR 3 635 Pre-Electrified - - - 124.89475 -9.13591 22444 5306062001 FATUKBOT NUSA TENGGARA TIMUR 3 353 Pre-Electrified - - - 124.88946 -9.13270 22445 5306062001 FATUKBOT NUSA TENGGARA TIMUR 411 Pre-Electrified - - - 124.89888 -9.12353 22446 5306062002 LIDAK NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 124.88459 -9.12518 22447 5306062002 LIDAK NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 124.88225 -9.12515 22448 5306062002 LIDAK NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.87635 -9.12501 22449 5306062002 LIDAK NUSA TENGGARA TIMUR 1 175 Pre-Electrified - - - 124.88750 -9.12694 22450 5306062002 LIDAK NUSA TENGGARA TIMUR 10 Pre-Electrified - - - 124.87489 -9.11857 22451 5306062002 LIDAK NUSA TENGGARA TIMUR 389 Pre-Electrified - - - 124.88387 -9.12441 22452 5306062002 LIDAK NUSA TENGGARA TIMUR 439 Pre-Electrified - - - 124.88132 -9.12403 22453 5306062002 LIDAK NUSA TENGGARA TIMUR 93 Pre-Electrified - - - 124.87692 -9.12414 22454 5306062002 LIDAK NUSA TENGGARA TIMUR 2 613 Pre-Electrified - - - 124.88843 -9.12026 22455 5306062003 MANUAMAN NUSA TENGGARA TIMUR 383 Pre-Electrified - - - 124.87431 -9.11030 22456 5306062003 MANUAMAN NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 124.87230 -9.10338 22457 5306062003 MANUAMAN NUSA TENGGARA TIMUR 280 Pre-Electrified - - - 124.87074 -9.11194 22458 5306062003 MANUAMAN NUSA TENGGARA TIMUR 5 847 Pre-Electrified - - - 124.88834 -9.11045 22459 5306062003 MANUAMAN NUSA TENGGARA TIMUR 3 Pre-Electrified - - - 124.87505 -9.10998 22460 5306062004 RINBESI NUSA TENGGARA TIMUR 3 271 Pre-Electrified - - - 124.89260 -9.11152 22461 5306070001 FATUBA'A NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 124.90390 -9.16443 22462 5306070002 DAFALA NUSA TENGGARA TIMUR 49 MiniGrid Systems 12 8 436 1.8 124.98671 -9.15382 22463 5306070002 DAFALA NUSA TENGGARA TIMUR 22 OffGrid Systems 5 3 515 0.8 124.97688 -9.15022 22464 5306070002 DAFALA NUSA TENGGARA TIMUR 827 Pre-Electrified - - - 124.96561 -9.17569 22465 5306070002 DAFALA NUSA TENGGARA TIMUR 440 Pre-Electrified - - - 124.96095 -9.14739 22466 5306070004 MANLETEN NUSA TENGGARA TIMUR 136 Pre-Electrified - - - 124.98754 -9.12703 22467 5306070004 MANLETEN NUSA TENGGARA TIMUR 84 Pre-Electrified - - - 124.98715 -9.12849 22468 5306070004 MANLETEN NUSA TENGGARA TIMUR 476 Pre-Electrified - - - 124.98764 -9.13297 22469 5306070004 MANLETEN NUSA TENGGARA TIMUR 789 Pre-Electrified - - - 124.98548 -9.12574 22470 5306070004 MANLETEN NUSA TENGGARA TIMUR 798 Pre-Electrified - - - 124.98322 -9.13067 22471 5306070004 MANLETEN NUSA TENGGARA TIMUR 322 Pre-Electrified - - - 124.97998 -9.12850 22472 5306070004 MANLETEN NUSA TENGGARA TIMUR 657 Pre-Electrified - - - 124.97687 -9.13858 22473 5306070004 MANLETEN NUSA TENGGARA TIMUR 135 Pre-Electrified - - - 124.97343 -9.13021 22474 5306070004 MANLETEN NUSA TENGGARA TIMUR 645 Pre-Electrified - - - 124.95422 -9.13235 22475 5306070004 MANLETEN NUSA TENGGARA TIMUR 349 Pre-Electrified - - - 124.90548 -9.14463 22476 5306070004 MANLETEN NUSA TENGGARA TIMUR 71 Pre-Electrified - - - 124.90434 -9.12671 22477 5306070004 MANLETEN NUSA TENGGARA TIMUR 194 Pre-Electrified - - - 124.90363 -9.13112 22478 5306070004 MANLETEN NUSA TENGGARA TIMUR 963 Pre-Electrified - - - 124.90326 -9.13623 22479 5306070004 MANLETEN NUSA TENGGARA TIMUR 807 Pre-Electrified - - - 124.98499 -9.12467 22480 5306070004 MANLETEN NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 124.98206 -9.12360 22481 5306070004 MANLETEN NUSA TENGGARA TIMUR 347 Pre-Electrified - - - 124.97995 -9.12034 22482 5306070004 MANLETEN NUSA TENGGARA TIMUR 247 Pre-Electrified - - - 124.97965 -9.12350 22483 5306070004 MANLETEN NUSA TENGGARA TIMUR 232 Pre-Electrified - - - 124.93453 -9.11990 22484 5306070005 UMAKLARAN NUSA TENGGARA TIMUR 207 Pre-Electrified - - - 124.92150 -9.06960 22485 5306070006 TULAKADI NUSA TENGGARA TIMUR 176 Pre-Electrified - - - 124.92872 -9.04574 22486 5306070006 TULAKADI NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 124.92794 -9.04628 22487 5306070006 TULAKADI NUSA TENGGARA TIMUR 818 Pre-Electrified - - - 124.92685 -9.04790 22488 5306070007 SILAWAN NUSA TENGGARA TIMUR 788 Pre-Electrified - - - 124.92945 -9.00247 22489 5306070007 SILAWAN NUSA TENGGARA TIMUR 258 Pre-Electrified - - - 124.92527 -9.00855 22490 5306070007 SILAWAN NUSA TENGGARA TIMUR 227 Pre-Electrified - - - 124.94745 -8.95889 22491 5306070007 SILAWAN NUSA TENGGARA TIMUR 612 Pre-Electrified - - - 124.94589 -8.96524 22492 5306070007 SILAWAN NUSA TENGGARA TIMUR 379 Pre-Electrified - - - 124.93783 -8.96504 22493 5306070007 SILAWAN NUSA TENGGARA TIMUR 770 Pre-Electrified - - - 124.93270 -8.99396 22494 5306070007 SILAWAN NUSA TENGGARA TIMUR 489 Pre-Electrified - - - 124.92114 -8.97432 Annex II – Demand forecast results Page 147 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 22495 5306070009 SARABAU NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 124.99363 -9.08909 22496 5306070009 SARABAU NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 124.99801 -9.09301 22497 5306070009 SARABAU NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 124.99686 -9.09260 22498 5306070009 SARABAU NUSA TENGGARA TIMUR 90 Pre-Electrified - - - 125.00176 -9.09426 22499 5306070010 BAUHO NUSA TENGGARA TIMUR 175 Pre-Electrified - - - 124.99576 -9.09990 22500 5306070010 BAUHO NUSA TENGGARA TIMUR 86 Pre-Electrified - - - 124.99538 -9.10282 22501 5306070010 BAUHO NUSA TENGGARA TIMUR 17 Pre-Electrified - - - 124.98661 -9.09318 22502 5306070017 HALIMODOK NUSA TENGGARA TIMUR - Pre-Electrified - - - 125.00611 -9.14407 22503 5306070018 TIALAI NUSA TENGGARA TIMUR 46 Pre-Electrified - - - 124.90424 -9.16474 22504 5306071001 ASUMANU NUSA TENGGARA TIMUR 112 Pre-Electrified - - - 125.10001 -9.01326 22505 5306071001 ASUMANU NUSA TENGGARA TIMUR 92 Pre-Electrified - - - 125.09550 -9.02046 22506 5306071001 ASUMANU NUSA TENGGARA TIMUR 237 Pre-Electrified - - - 125.09537 -9.01617 22507 5306071001 ASUMANU NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 125.09184 -9.04043 22508 5306071001 ASUMANU NUSA TENGGARA TIMUR 153 Pre-Electrified - - - 125.09123 -9.05107 22509 5306071001 ASUMANU NUSA TENGGARA TIMUR 64 MiniGrid Systems 19 13 357 2.9 125.08399 -9.01621 22510 5306071001 ASUMANU NUSA TENGGARA TIMUR 112 Pre-Electrified - - - 125.08196 -9.04419 22511 5306071001 ASUMANU NUSA TENGGARA TIMUR 108 Pre-Electrified - - - 125.08196 -9.04651 22512 5306071001 ASUMANU NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 125.08044 -9.04960 22513 5306071001 ASUMANU NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 125.09346 -9.03591 22514 5306071001 ASUMANU NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 125.09284 -9.03623 22515 5306071001 ASUMANU NUSA TENGGARA TIMUR 53 Pre-Electrified - - - 125.09241 -9.03747 22516 5306071001 ASUMANU NUSA TENGGARA TIMUR 71 Pre-Electrified - - - 125.09360 -9.03108 22517 5306071001 ASUMANU NUSA TENGGARA TIMUR 218 Pre-Electrified - - - 125.09254 -9.03205 22518 5306071001 ASUMANU NUSA TENGGARA TIMUR 134 Pre-Electrified - - - 125.09080 -9.03002 22519 5306071001 ASUMANU NUSA TENGGARA TIMUR 96 Pre-Electrified - - - 125.08894 -9.04345 22520 5306071001 ASUMANU NUSA TENGGARA TIMUR 157 Pre-Electrified - - - 125.08615 -9.04484 22521 5306071002 TOHE NUSA TENGGARA TIMUR 272 Pre-Electrified - - - 125.11499 -9.01387 22522 5306071002 TOHE NUSA TENGGARA TIMUR 81 Pre-Electrified - - - 125.11470 -9.01014 22523 5306071002 TOHE NUSA TENGGARA TIMUR 202 Pre-Electrified - - - 125.11443 -9.00352 22524 5306071002 TOHE NUSA TENGGARA TIMUR 2 855 Pre-Electrified - - - 125.11203 -9.00508 22525 5306071002 TOHE NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 125.10728 -9.01347 22526 5306071002 TOHE NUSA TENGGARA TIMUR 350 Pre-Electrified - - - 125.10700 -9.01161 22527 5306071002 TOHE NUSA TENGGARA TIMUR 181 Pre-Electrified - - - 125.10574 -9.01388 22528 5306071002 TOHE NUSA TENGGARA TIMUR 91 Pre-Electrified - - - 125.10522 -9.01212 22529 5306071002 TOHE NUSA TENGGARA TIMUR 148 Pre-Electrified - - - 125.10379 -9.01393 22530 5306071002 TOHE NUSA TENGGARA TIMUR 250 Pre-Electrified - - - 125.10882 -8.99779 22531 5306071005 MAUMUTIN NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 125.12471 -9.00913 22532 5306071005 MAUMUTIN NUSA TENGGARA TIMUR 189 Pre-Electrified - - - 125.12215 -9.00795 22533 5306071005 MAUMUTIN NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 125.12496 -9.01186 22534 5306071005 MAUMUTIN NUSA TENGGARA TIMUR 79 Pre-Electrified - - - 125.13137 -9.01377 22535 5306071005 MAUMUTIN NUSA TENGGARA TIMUR 482 Pre-Electrified - - - 125.12912 -9.00072 22536 5306071005 MAUMUTIN NUSA TENGGARA TIMUR 182 Pre-Electrified - - - 125.12605 -9.00829 22537 5306071005 MAUMUTIN NUSA TENGGARA TIMUR 435 Pre-Electrified - - - 125.12748 -9.01352 22538 5306071005 MAUMUTIN NUSA TENGGARA TIMUR 76 Pre-Electrified - - - 125.12639 -9.01195 22539 5306071005 MAUMUTIN NUSA TENGGARA TIMUR 167 Pre-Electrified - - - 125.12528 -9.01206 22540 5306071005 MAUMUTIN NUSA TENGGARA TIMUR 1 462 Pre-Electrified - - - 125.12962 -8.99689 22541 5306072001 LASIOLAT NUSA TENGGARA TIMUR 91 Pre-Electrified - - - 125.01926 -9.07919 22542 5306072001 LASIOLAT NUSA TENGGARA TIMUR 133 Pre-Electrified - - - 125.01693 -9.06458 22543 5306072001 LASIOLAT NUSA TENGGARA TIMUR 189 Pre-Electrified - - - 125.01289 -9.08742 22544 5306072001 LASIOLAT NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 125.01215 -9.06838 22545 5306072001 LASIOLAT NUSA TENGGARA TIMUR 31 Pre-Electrified - - - 125.02307 -9.07488 22546 5306072001 LASIOLAT NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 125.02334 -9.07686 22547 5306072001 LASIOLAT NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 125.01492 -9.06605 22548 5306072001 LASIOLAT NUSA TENGGARA TIMUR 96 Pre-Electrified - - - 125.01357 -9.06700 22549 5306072002 MANEIKUN NUSA TENGGARA TIMUR 262 Pre-Electrified - - - 125.01889 -9.06336 22550 5306072002 MANEIKUN NUSA TENGGARA TIMUR 390 Pre-Electrified - - - 125.02643 -9.07705 22551 5306072002 MANEIKUN NUSA TENGGARA TIMUR 99 Pre-Electrified - - - 125.02323 -9.07455 22552 5306072003 FATULOTU NUSA TENGGARA TIMUR 56 Pre-Electrified - - - 125.05874 -9.06877 22553 5306072003 FATULOTU NUSA TENGGARA TIMUR 23 Pre-Electrified - - - 125.05114 -9.06500 22554 5306072003 FATULOTU NUSA TENGGARA TIMUR 16 Pre-Electrified - - - 125.05088 -9.06345 22555 5306072003 FATULOTU NUSA TENGGARA TIMUR 337 Pre-Electrified - - - 125.05091 -9.07318 22556 5306072003 FATULOTU NUSA TENGGARA TIMUR 25 Pre-Electrified - - - 125.03758 -9.07997 22557 5306072003 FATULOTU NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 125.03494 -9.08042 22558 5306072003 FATULOTU NUSA TENGGARA TIMUR 192 Pre-Electrified - - - 125.03236 -9.08044 22559 5306072003 FATULOTU NUSA TENGGARA TIMUR 401 Pre-Electrified - - - 125.04660 -9.07404 22560 5306072003 FATULOTU NUSA TENGGARA TIMUR 120 Pre-Electrified - - - 125.04367 -9.07670 22561 5306072003 FATULOTU NUSA TENGGARA TIMUR 17 Pre-Electrified - - - 125.04196 -9.07763 22562 5306072003 FATULOTU NUSA TENGGARA TIMUR 135 Pre-Electrified - - - 125.03987 -9.07871 22563 5306072004 LAKANMAU NUSA TENGGARA TIMUR 154 Pre-Electrified - - - 125.05206 -9.08180 22564 5306072004 LAKANMAU NUSA TENGGARA TIMUR 89 Pre-Electrified - - - 125.01779 -9.07909 22565 5306072004 LAKANMAU NUSA TENGGARA TIMUR 91 Pre-Electrified - - - 125.01339 -9.08633 22566 5306072004 LAKANMAU NUSA TENGGARA TIMUR 150 Pre-Electrified - - - 125.02715 -9.07754 22567 5306072004 LAKANMAU NUSA TENGGARA TIMUR 46 Pre-Electrified - - - 125.02337 -9.07725 22568 5306072006 DUALASI NUSA TENGGARA TIMUR 105 Pre-Electrified - - - 125.06751 -9.06602 22569 5306072006 DUALASI NUSA TENGGARA TIMUR 56 Pre-Electrified - - - 125.06697 -9.06758 22570 5306072006 DUALASI NUSA TENGGARA TIMUR 222 Pre-Electrified - - - 125.06637 -9.07216 22571 5306072006 DUALASI NUSA TENGGARA TIMUR 130 Pre-Electrified - - - 125.06459 -9.06108 22572 5306072007 BAUDAOK NUSA TENGGARA TIMUR 430 Pre-Electrified - - - 125.06183 -9.05221 22573 5306072007 BAUDAOK NUSA TENGGARA TIMUR 111 Pre-Electrified - - - 125.06027 -9.05274 22574 5306080013 MAHUITAS NUSA TENGGARA TIMUR 2 OffGrid Systems 1 703 0.2 125.16920 -9.06339 22575 5306080014 MAKIR NUSA TENGGARA TIMUR 6 OffGrid Systems 2 1 406 0.3 125.16612 -9.02827 22576 5306080014 MAKIR NUSA TENGGARA TIMUR - Pre-Electrified - - - 125.15930 -9.03973 22577 5306081003 HENES NUSA TENGGARA TIMUR 20 OffGrid Systems 5 3 515 0.8 125.17628 -9.16157 22578 5307010033 BANDAR NUSA TENGGARA TIMUR 161 Pre-Electrified - - - 124.19764 -8.27886 22579 5307010033 BANDAR NUSA TENGGARA TIMUR 403 Pre-Electrified - - - 124.20168 -8.27731 Annex II – Demand forecast results Page 148 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 22580 5307010034 MADAR NUSA TENGGARA TIMUR 116 Pre-Electrified - - - 124.20942 -8.26382 22581 5307010034 MADAR NUSA TENGGARA TIMUR 130 Pre-Electrified - - - 124.20576 -8.27187 22582 5307010034 MADAR NUSA TENGGARA TIMUR 206 Pre-Electrified - - - 124.20673 -8.26703 22583 5307010035 BOUWELI NUSA TENGGARA TIMUR 201 Pre-Electrified - - - 124.21868 -8.26011 22584 5307010035 BOUWELI NUSA TENGGARA TIMUR 407 Pre-Electrified - - - 124.22189 -8.26280 22585 5307010040 MUNASELI NUSA TENGGARA TIMUR 39 MiniGrid Systems 9 7 641 1.6 124.29204 -8.18775 22586 5307010042 BANA NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 124.28523 -8.17748 22587 5307010044 BUKITMAS NUSA TENGGARA TIMUR 259 Pre-Electrified - - - 124.22455 -8.23728 22588 5307010045 WAILAWAR NUSA TENGGARA TIMUR 90 Pre-Electrified - - - 124.23695 -8.21109 22589 5307010045 WAILAWAR NUSA TENGGARA TIMUR 132 Pre-Electrified - - - 124.24144 -8.20733 22590 5307010045 WAILAWAR NUSA TENGGARA TIMUR 334 Pre-Electrified - - - 124.23036 -8.21753 22591 5307010046 KABIR NUSA TENGGARA TIMUR 76 Pre-Electrified - - - 124.21396 -8.25897 22592 5307010046 KABIR NUSA TENGGARA TIMUR 170 Pre-Electrified - - - 124.22106 -8.25841 22593 5307010046 KABIR NUSA TENGGARA TIMUR 1 018 Pre-Electrified - - - 124.21565 -8.25678 22594 5307010046 KABIR NUSA TENGGARA TIMUR 64 Pre-Electrified - - - 124.21974 -8.24755 22595 5307010046 KABIR NUSA TENGGARA TIMUR 164 Pre-Electrified - - - 124.22041 -8.24616 22596 5307010046 KABIR NUSA TENGGARA TIMUR 801 Pre-Electrified - - - 124.21679 -8.24741 22597 5307010046 KABIR NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 124.21503 -8.24969 22598 5307011009 LEER NUSA TENGGARA TIMUR 284 Pre-Electrified - - - 124.07537 -8.36910 22599 5307011009 LEER NUSA TENGGARA TIMUR 395 Pre-Electrified - - - 124.07507 -8.37319 22600 5307011010 BLANG MERANG NUSA TENGGARA TIMUR 1 599 Pre-Electrified - - - 124.09415 -8.35851 22601 5307011011 BARALER NUSA TENGGARA TIMUR 942 Pre-Electrified - - - 124.09163 -8.36085 22602 5307011012 BARANUSA NUSA TENGGARA TIMUR 1 024 Pre-Electrified - - - 124.09434 -8.36160 22603 5307011013 PIRING SINA NUSA TENGGARA TIMUR 509 Pre-Electrified - - - 124.09958 -8.36705 22604 5307011014 ILLU NUSA TENGGARA TIMUR 243 Pre-Electrified - - - 124.08627 -8.37781 22605 5307011014 ILLU NUSA TENGGARA TIMUR 488 Pre-Electrified - - - 124.09022 -8.36356 22606 5307012003 NULE NUSA TENGGARA TIMUR 396 Pre-Electrified - - - 124.23760 -8.37566 22607 5307012003 NULE NUSA TENGGARA TIMUR 591 Pre-Electrified - - - 124.23882 -8.37383 22608 5307012004 KALEB NUSA TENGGARA TIMUR 177 Pre-Electrified - - - 124.24851 -8.35910 22609 5307012004 KALEB NUSA TENGGARA TIMUR 557 Pre-Electrified - - - 124.25487 -8.35557 22610 5307012004 KALEB NUSA TENGGARA TIMUR 851 Pre-Electrified - - - 124.26113 -8.34999 22611 5307012005 BUNGA BALI NUSA TENGGARA TIMUR 10 Pre-Electrified - - - 124.26580 -8.34858 22612 5307012007 LEKOM NUSA TENGGARA TIMUR 73 MiniGrid Systems 16 13 584 2.9 124.24748 -8.32958 22613 5307014004 MAUTA NUSA TENGGARA TIMUR 78 MiniGrid Systems 21 17 829 3.8 124.16917 -8.50855 22614 5307014006 ARAMABA NUSA TENGGARA TIMUR 18 MiniGrid Systems 6 5 094 1.1 124.17939 -8.48406 22615 5307020001 HALERMAN NUSA TENGGARA TIMUR 120 MiniGrid Systems 24 20 376 4.4 124.34759 -8.38945 22616 5307020001 HALERMAN NUSA TENGGARA TIMUR 328 MiniGrid Systems 66 56 034 12.1 124.34270 -8.41718 22617 5307020001 HALERMAN NUSA TENGGARA TIMUR 41 MiniGrid Systems 9 7 641 1.6 124.37671 -8.43594 22618 5307020001 HALERMAN NUSA TENGGARA TIMUR 52 MiniGrid Systems 11 9 339 2.0 124.39207 -8.42743 22619 5307020001 HALERMAN NUSA TENGGARA TIMUR 59 MiniGrid Systems 12 10 188 2.2 124.39073 -8.40482 22620 5307020003 MANATANG NUSA TENGGARA TIMUR 5 OffGrid Systems 2 1 698 0.4 124.46220 -8.42599 22621 5307020003 MANATANG NUSA TENGGARA TIMUR 14 OffGrid Systems 4 3 396 0.7 124.45578 -8.42588 22622 5307020015 KAFELULANG NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.56400 -8.38598 22623 5307020015 KAFELULANG NUSA TENGGARA TIMUR 82 MiniGrid Systems 16 13 584 2.9 124.56372 -8.34364 22624 5307020016 PINTU MAS NUSA TENGGARA TIMUR 68 MiniGrid Systems 13 11 037 2.4 124.52715 -8.29024 22625 5307020016 PINTU MAS NUSA TENGGARA TIMUR 41 MiniGrid Systems 8 6 792 1.5 124.53504 -8.29889 22626 5307020018 PROBUR NUSA TENGGARA TIMUR 180 Pre-Electrified - - - 124.41801 -8.38058 22627 5307020018 PROBUR NUSA TENGGARA TIMUR 357 Pre-Electrified - - - 124.41700 -8.37672 22628 5307020018 PROBUR NUSA TENGGARA TIMUR 312 Pre-Electrified - - - 124.37108 -8.36490 22629 5307020018 PROBUR NUSA TENGGARA TIMUR 129 Pre-Electrified - - - 124.41938 -8.35346 22630 5307020018 PROBUR NUSA TENGGARA TIMUR 387 Pre-Electrified - - - 124.41560 -8.35721 22631 5307020018 PROBUR NUSA TENGGARA TIMUR 546 Pre-Electrified - - - 124.41731 -8.37294 22632 5307020019 PROBUR UTARA NUSA TENGGARA TIMUR 704 Pre-Electrified - - - 124.42860 -8.32625 22633 5307020020 WOLWAL BARAT NUSA TENGGARA TIMUR 155 Pre-Electrified - - - 124.41417 -8.29325 22634 5307020020 WOLWAL BARAT NUSA TENGGARA TIMUR 237 Pre-Electrified - - - 124.40966 -8.29568 22635 5307020022 WOLWAL TENGAH NUSA TENGGARA TIMUR 159 Pre-Electrified - - - 124.43931 -8.28382 22636 5307020022 WOLWAL TENGAH NUSA TENGGARA TIMUR 160 Pre-Electrified - - - 124.43110 -8.29014 22637 5307020022 WOLWAL TENGAH NUSA TENGGARA TIMUR 532 Pre-Electrified - - - 124.44430 -8.28011 22638 5307020023 WOLWAL NUSA TENGGARA TIMUR 521 Pre-Electrified - - - 124.44849 -8.27199 22639 5307020023 WOLWAL NUSA TENGGARA TIMUR 375 Pre-Electrified - - - 124.44682 -8.27608 22640 5307020024 MORU NUSA TENGGARA TIMUR 2 377 Pre-Electrified - - - 124.51497 -8.25556 22641 5307020024 MORU NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.51604 -8.25000 22642 5307020025 MORAMAM NUSA TENGGARA TIMUR 1 333 Pre-Electrified - - - 124.51544 -8.26157 22643 5307020026 MORBA NUSA TENGGARA TIMUR 4 OffGrid Systems 1 849 0.2 124.51923 -8.26676 22644 5307020026 MORBA NUSA TENGGARA TIMUR 752 Pre-Electrified - - - 124.52235 -8.26340 22645 5307020026 MORBA NUSA TENGGARA TIMUR 79 Pre-Electrified - - - 124.51873 -8.26106 22646 5307020027 PAILELANG NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 124.53217 -8.25428 22647 5307020027 PAILELANG NUSA TENGGARA TIMUR 24 MiniGrid Systems 7 5 943 1.3 124.56008 -8.30358 22648 5307020027 PAILELANG NUSA TENGGARA TIMUR 26 MiniGrid Systems 8 6 792 1.5 124.55156 -8.30698 22649 5307020027 PAILELANG NUSA TENGGARA TIMUR 196 Pre-Electrified - - - 124.53045 -8.25111 22650 5307020027 PAILELANG NUSA TENGGARA TIMUR 90 Pre-Electrified - - - 124.52800 -8.25461 22651 5307020027 PAILELANG NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 124.52323 -8.26258 22652 5307020027 PAILELANG NUSA TENGGARA TIMUR 737 Pre-Electrified - - - 124.53031 -8.24785 22653 5307021001 LAKATULI NUSA TENGGARA TIMUR 74 MiniGrid Systems 18 15 282 3.3 124.61328 -8.41716 22654 5307021006 MATARU UTARA NUSA TENGGARA TIMUR 3 OffGrid Systems 1 849 0.2 124.62496 -8.33226 22655 5307021007 MATARU BARAT NUSA TENGGARA TIMUR 157 MiniGrid Systems 31 26 319 5.7 124.58946 -8.31326 22656 5307030004 KIRAMAN NUSA TENGGARA TIMUR 39 MiniGrid Systems 11 9 339 2.0 124.73564 -8.35247 22657 5307030004 KIRAMAN NUSA TENGGARA TIMUR 58 MiniGrid Systems 16 13 584 2.9 124.78927 -8.36344 22658 5307030009 TAMANAPUI NUSA TENGGARA TIMUR 4 OffGrid Systems 2 1 698 0.4 124.74245 -8.31471 22659 5307030010 KELAISI TIMUR NUSA TENGGARA TIMUR 9 OffGrid Systems 3 2 547 0.5 124.74671 -8.26067 22660 5307030010 KELAISI TIMUR NUSA TENGGARA TIMUR 27 MiniGrid Systems 7 5 943 1.3 124.76107 -8.26554 22661 5307030013 KELAISI BARAT NUSA TENGGARA TIMUR 14 OffGrid Systems 4 3 396 0.7 124.66354 -8.28395 22662 5307040004 ELOK NUSA TENGGARA TIMUR 20 OffGrid Systems 5 4 245 0.9 125.04391 -8.35514 22663 5307040004 ELOK NUSA TENGGARA TIMUR 49 MiniGrid Systems 11 9 339 2.0 125.01165 -8.35379 22664 5307040004 ELOK NUSA TENGGARA TIMUR 52 MiniGrid Systems 12 10 188 2.2 125.04494 -8.35398 Annex II – Demand forecast results Page 149 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 22665 5307040004 ELOK NUSA TENGGARA TIMUR 118 MiniGrid Systems 26 22 074 4.8 125.04131 -8.35296 22666 5307040005 MARITAING NUSA TENGGARA TIMUR 478 Pre-Electrified - - - 125.11520 -8.29523 22667 5307040005 MARITAING NUSA TENGGARA TIMUR 314 Pre-Electrified - - - 125.12253 -8.29222 22668 5307040005 MARITAING NUSA TENGGARA TIMUR 36 Pre-Electrified - - - 125.12667 -8.28253 22669 5307040005 MARITAING NUSA TENGGARA TIMUR 172 Pre-Electrified - - - 125.12560 -8.29015 22670 5307040007 KOLANA UTARA NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 125.13839 -8.26133 22671 5307040007 KOLANA UTARA NUSA TENGGARA TIMUR 5 Pre-Electrified - - - 125.12773 -8.28168 22672 5307040007 KOLANA UTARA NUSA TENGGARA TIMUR 10 Pre-Electrified - - - 125.14222 -8.25014 22673 5307040007 KOLANA UTARA NUSA TENGGARA TIMUR 99 MiniGrid Systems 23 19 527 4.2 125.12220 -8.20556 22674 5307040007 KOLANA UTARA NUSA TENGGARA TIMUR 58 Pre-Electrified - - - 125.13940 -8.23480 22675 5307040007 KOLANA UTARA NUSA TENGGARA TIMUR 1 024 Pre-Electrified - - - 125.14046 -8.24308 22676 5307040008 MAUSAMANG NUSA TENGGARA TIMUR 29 MiniGrid Systems 7 5 943 1.3 124.96760 -8.15093 22677 5307040008 MAUSAMANG NUSA TENGGARA TIMUR 41 MiniGrid Systems 9 7 641 1.6 124.96388 -8.14854 22678 5307040008 MAUSAMANG NUSA TENGGARA TIMUR 73 MiniGrid Systems 16 13 584 2.9 124.96563 -8.14974 22679 5307040008 MAUSAMANG NUSA TENGGARA TIMUR 174 MiniGrid Systems 38 32 262 7.0 125.10100 -8.17490 22680 5307040008 MAUSAMANG NUSA TENGGARA TIMUR 206 MiniGrid Systems 45 38 205 8.2 125.09809 -8.17702 22681 5307040022 MAUKURU NUSA TENGGARA TIMUR 25 MiniGrid Systems 7 5 943 1.3 124.97306 -8.20646 22682 5307041001 PIDO NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.81636 -8.27200 22683 5307041002 LIPPANG NUSA TENGGARA TIMUR 13 OffGrid Systems 4 3 396 0.7 124.76142 -8.26523 22684 5307041003 KENARIMBALA NUSA TENGGARA TIMUR 31 MiniGrid Systems 7 5 943 1.3 124.83874 -8.21194 22685 5307041004 NAILANG NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 124.78713 -8.17360 22686 5307041004 NAILANG NUSA TENGGARA TIMUR 20 Pre-Electrified - - - 124.76454 -8.16995 22687 5307041004 NAILANG NUSA TENGGARA TIMUR 200 Pre-Electrified - - - 124.76707 -8.17981 22688 5307041004 NAILANG NUSA TENGGARA TIMUR 200 Pre-Electrified - - - 124.76574 -8.17217 22689 5307041005 WAISIKA NUSA TENGGARA TIMUR 28 MiniGrid Systems 8 6 792 1.5 124.73603 -8.20965 22690 5307041005 WAISIKA NUSA TENGGARA TIMUR 772 Pre-Electrified - - - 124.76397 -8.18204 22691 5307041005 WAISIKA NUSA TENGGARA TIMUR - Pre-Electrified - - - 124.76361 -8.16879 22692 5307041005 WAISIKA NUSA TENGGARA TIMUR 92 Pre-Electrified - - - 124.75770 -8.17450 22693 5307041005 WAISIKA NUSA TENGGARA TIMUR 268 Pre-Electrified - - - 124.75662 -8.18409 22694 5307041005 WAISIKA NUSA TENGGARA TIMUR 927 Pre-Electrified - - - 124.76133 -8.17073 22695 5307041006 KAMOT NUSA TENGGARA TIMUR 89 Pre-Electrified - - - 124.78268 -8.17526 22696 5307041006 KAMOT NUSA TENGGARA TIMUR 56 Pre-Electrified - - - 124.79035 -8.17439 22697 5307041006 KAMOT NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 124.78752 -8.17353 22698 5307041006 KAMOT NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 124.76407 -8.16926 22699 5307041006 KAMOT NUSA TENGGARA TIMUR 9 Pre-Electrified - - - 124.76655 -8.16960 22700 5307041006 KAMOT NUSA TENGGARA TIMUR 371 Pre-Electrified - - - 124.77257 -8.16961 22701 5307041006 KAMOT NUSA TENGGARA TIMUR 375 Pre-Electrified - - - 124.77253 -8.16733 22702 5307041007 AIR MANCUR NUSA TENGGARA TIMUR 53 Pre-Electrified - - - 124.79120 -8.15930 22703 5307041007 AIR MANCUR NUSA TENGGARA TIMUR 123 Pre-Electrified - - - 124.79303 -8.15876 22704 5307041007 AIR MANCUR NUSA TENGGARA TIMUR 381 Pre-Electrified - - - 124.79242 -8.16297 22705 5307042003 PURNAMA NUSA TENGGARA TIMUR 18 OffGrid Systems 5 4 245 0.9 124.96658 -8.33325 22706 5307042003 PURNAMA NUSA TENGGARA TIMUR 75 MiniGrid Systems 20 16 980 3.7 124.94360 -8.35577 22707 5307042003 PURNAMA NUSA TENGGARA TIMUR 50 MiniGrid Systems 13 11 037 2.4 124.92528 -8.35896 22708 5307042004 LANGKURU UTARA NUSA TENGGARA TIMUR 41 MiniGrid Systems 11 9 339 2.0 124.80403 -8.33740 22709 5307050001 TELUK KENARI NUSA TENGGARA TIMUR 388 Pre-Electrified - - - 124.47276 -8.24079 22710 5307050001 TELUK KENARI NUSA TENGGARA TIMUR 510 Pre-Electrified - - - 124.47765 -8.23805 22711 5307050002 KALABAHI BARAT NUSA TENGGARA TIMUR 1 660 Pre-Electrified - - - 124.49878 -8.22692 22712 5307050002 KALABAHI BARAT NUSA TENGGARA TIMUR 1 816 Pre-Electrified - - - 124.50132 -8.22357 22713 5307050003 ADANG BUOM NUSA TENGGARA TIMUR 324 Pre-Electrified - - - 124.50197 -8.21621 22714 5307050003 ADANG BUOM NUSA TENGGARA TIMUR 1 240 Pre-Electrified - - - 124.50737 -8.22064 22715 5307050003 ADANG BUOM NUSA TENGGARA TIMUR 13 Pre-Electrified - - - 124.50309 -8.22061 22716 5307050004 BINONGKO NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 124.50765 -8.22218 22717 5307050004 BINONGKO NUSA TENGGARA TIMUR 3 151 Pre-Electrified - - - 124.51184 -8.21887 22718 5307050005 MOTONGBANG NUSA TENGGARA TIMUR 2 781 Pre-Electrified - - - 124.51294 -8.21430 22719 5307050006 KALABAHI KOTA NUSA TENGGARA TIMUR 3 369 Pre-Electrified - - - 124.51656 -8.21486 22720 5307050007 WETABUA NUSA TENGGARA TIMUR 2 285 Pre-Electrified - - - 124.52327 -8.21759 22721 5307050008 NUSA KENARI NUSA TENGGARA TIMUR 3 483 Pre-Electrified - - - 124.52602 -8.21403 22722 5307050009 LENDOLA NUSA TENGGARA TIMUR 2 110 Pre-Electrified - - - 124.52114 -8.20950 22723 5307050009 LENDOLA NUSA TENGGARA TIMUR 1 330 Pre-Electrified - - - 124.52346 -8.21204 22724 5307050010 AIR KENARI NUSA TENGGARA TIMUR 498 Pre-Electrified - - - 124.53374 -8.20384 22725 5307050010 AIR KENARI NUSA TENGGARA TIMUR 1 403 Pre-Electrified - - - 124.53237 -8.20741 22726 5307050011 KALABAHI TENGAH NUSA TENGGARA TIMUR 189 Pre-Electrified - - - 124.53827 -8.20372 22727 5307050011 KALABAHI TENGAH NUSA TENGGARA TIMUR 5 298 Pre-Electrified - - - 124.53160 -8.21571 22728 5307050012 KALABAHI TIMUR NUSA TENGGARA TIMUR 5 754 Pre-Electrified - - - 124.53834 -8.21788 22729 5307050013 MUTIARA NUSA TENGGARA TIMUR 616 Pre-Electrified - - - 124.55404 -8.21245 22730 5307050013 MUTIARA NUSA TENGGARA TIMUR 3 842 Pre-Electrified - - - 124.54389 -8.21578 22731 5307050017 WELAI TIMUR NUSA TENGGARA TIMUR 398 Pre-Electrified - - - 124.57164 -8.21647 22732 5307050017 WELAI TIMUR NUSA TENGGARA TIMUR 1 719 Pre-Electrified - - - 124.55942 -8.21190 22733 5307050020 WELAI BARAT NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 124.55765 -8.23522 22734 5307050020 WELAI BARAT NUSA TENGGARA TIMUR 31 Pre-Electrified - - - 124.56063 -8.23529 22735 5307050020 WELAI BARAT NUSA TENGGARA TIMUR 25 Pre-Electrified - - - 124.57038 -8.21686 22736 5307050020 WELAI BARAT NUSA TENGGARA TIMUR 512 Pre-Electrified - - - 124.56718 -8.22372 22737 5307050020 WELAI BARAT NUSA TENGGARA TIMUR 814 Pre-Electrified - - - 124.56459 -8.23263 22738 5307050020 WELAI BARAT NUSA TENGGARA TIMUR 1 051 Pre-Electrified - - - 124.55340 -8.23180 22739 5307050020 WELAI BARAT NUSA TENGGARA TIMUR 19 Pre-Electrified - - - 124.56722 -8.21724 22740 5307050021 FANATING NUSA TENGGARA TIMUR 46 Pre-Electrified - - - 124.53275 -8.25048 22741 5307050021 FANATING NUSA TENGGARA TIMUR 238 Pre-Electrified - - - 124.53498 -8.25061 22742 5307050021 FANATING NUSA TENGGARA TIMUR 299 Pre-Electrified - - - 124.53266 -8.24867 22743 5307050021 FANATING NUSA TENGGARA TIMUR 234 Pre-Electrified - - - 124.53451 -8.24309 22744 5307050021 FANATING NUSA TENGGARA TIMUR 372 Pre-Electrified - - - 124.54888 -8.24128 22745 5307050021 FANATING NUSA TENGGARA TIMUR 166 Pre-Electrified - - - 124.53706 -8.24961 22746 5307050021 FANATING NUSA TENGGARA TIMUR 549 Pre-Electrified - - - 124.54397 -8.24824 22747 5307051001 LAWAHING NUSA TENGGARA TIMUR 301 Pre-Electrified - - - 124.54243 -8.16676 22748 5307051001 LAWAHING NUSA TENGGARA TIMUR 505 Pre-Electrified - - - 124.53528 -8.15831 22749 5307051001 LAWAHING NUSA TENGGARA TIMUR 137 Pre-Electrified - - - 124.54044 -8.13193 Annex II – Demand forecast results Page 150 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 22750 5307051002 KOPIDIL NUSA TENGGARA TIMUR 83 Pre-Electrified - - - 124.55425 -8.20003 22751 5307051002 KOPIDIL NUSA TENGGARA TIMUR 58 Pre-Electrified - - - 124.55103 -8.16686 22752 5307051002 KOPIDIL NUSA TENGGARA TIMUR 798 Pre-Electrified - - - 124.55817 -8.17689 22753 5307051003 KABOLA NUSA TENGGARA TIMUR 960 Pre-Electrified - - - 124.59003 -8.14080 22754 5307051003 KABOLA NUSA TENGGARA TIMUR 147 Pre-Electrified - - - 124.59277 -8.13668 22755 5307051003 KABOLA NUSA TENGGARA TIMUR 166 Pre-Electrified - - - 124.59435 -8.19258 22756 5307051003 KABOLA NUSA TENGGARA TIMUR 303 Pre-Electrified - - - 124.59085 -8.19619 22757 5307051003 KABOLA NUSA TENGGARA TIMUR 726 Pre-Electrified - - - 124.59302 -8.17812 22758 5307051003 KABOLA NUSA TENGGARA TIMUR 1 053 Pre-Electrified - - - 124.59212 -8.16738 22759 5307051004 PANTE DEERA NUSA TENGGARA TIMUR 353 Pre-Electrified - - - 124.58455 -8.12828 22760 5307051004 PANTE DEERA NUSA TENGGARA TIMUR 388 Pre-Electrified - - - 124.57357 -8.12677 22761 5307051005 ALILA TIMUR NUSA TENGGARA TIMUR 957 Pre-Electrified - - - 124.53964 -8.13040 22762 5307060007 ALOR KECIL NUSA TENGGARA TIMUR 1 505 Pre-Electrified - - - 124.40923 -8.26912 22763 5307060008 LEFOKISU NUSA TENGGARA TIMUR 85 Pre-Electrified - - - 124.41541 -8.26496 22764 5307060008 LEFOKISU NUSA TENGGARA TIMUR 417 Pre-Electrified - - - 124.41187 -8.26944 22765 5307060008 LEFOKISU NUSA TENGGARA TIMUR 395 Pre-Electrified - - - 124.42023 -8.26830 22766 5307060009 AMPERA NUSA TENGGARA TIMUR 580 Pre-Electrified - - - 124.42648 -8.26563 22767 5307060010 LEWALU NUSA TENGGARA TIMUR 2 Pre-Electrified - - - 124.42960 -8.25443 22768 5307060010 LEWALU NUSA TENGGARA TIMUR 710 Pre-Electrified - - - 124.43194 -8.26237 22769 5307060012 DULOLONG BARAT NUSA TENGGARA TIMUR 643 Pre-Electrified - - - 124.44177 -8.25776 22770 5307060013 DULOLONG NUSA TENGGARA TIMUR 1 505 Pre-Electrified - - - 124.45195 -8.25324 22771 5307060013 DULOLONG NUSA TENGGARA TIMUR 29 Pre-Electrified - - - 124.46360 -8.24628 22772 5307060013 DULOLONG NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 124.46230 -8.24627 22773 5307060015 ALOR BESAR NUSA TENGGARA TIMUR 203 Pre-Electrified - - - 124.40776 -8.25429 22774 5307060015 ALOR BESAR NUSA TENGGARA TIMUR 58 MiniGrid Systems 17 14 433 3.1 124.42333 -8.23259 22775 5307060015 ALOR BESAR NUSA TENGGARA TIMUR 144 Pre-Electrified - - - 124.40196 -8.23267 22776 5307060015 ALOR BESAR NUSA TENGGARA TIMUR 163 Pre-Electrified - - - 124.40581 -8.24011 22777 5307060015 ALOR BESAR NUSA TENGGARA TIMUR 6 Pre-Electrified - - - 124.41614 -8.21468 22778 5307060015 ALOR BESAR NUSA TENGGARA TIMUR 532 Pre-Electrified - - - 124.40803 -8.21242 22779 5307060015 ALOR BESAR NUSA TENGGARA TIMUR 11 Pre-Electrified - - - 124.41470 -8.20865 22780 5307060019 O'AMATE NUSA TENGGARA TIMUR 174 Pre-Electrified - - - 124.41651 -8.21335 22781 5307060019 O'AMATE NUSA TENGGARA TIMUR 666 Pre-Electrified - - - 124.41525 -8.20682 22782 5307060020 AIMOLI NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 124.42779 -8.18767 22783 5307060020 AIMOLI NUSA TENGGARA TIMUR 93 Pre-Electrified - - - 124.42119 -8.19693 22784 5307060020 AIMOLI NUSA TENGGARA TIMUR 87 Pre-Electrified - - - 124.43684 -8.18002 22785 5307060020 AIMOLI NUSA TENGGARA TIMUR 313 Pre-Electrified - - - 124.42468 -8.19222 22786 5307060020 AIMOLI NUSA TENGGARA TIMUR 576 Pre-Electrified - - - 124.43340 -8.18138 22787 5307060021 ALAANG NUSA TENGGARA TIMUR 1 067 Pre-Electrified - - - 124.43779 -8.17544 22788 5307060022 ADANG NUSA TENGGARA TIMUR 24 Pre-Electrified - - - 124.44064 -8.17077 22789 5307060022 ADANG NUSA TENGGARA TIMUR 108 Pre-Electrified - - - 124.44087 -8.16910 22790 5307060022 ADANG NUSA TENGGARA TIMUR 116 Pre-Electrified - - - 124.44289 -8.17433 22791 5307060022 ADANG NUSA TENGGARA TIMUR 128 Pre-Electrified - - - 124.44535 -8.17224 22792 5307060022 ADANG NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 124.43889 -8.17193 22793 5307060022 ADANG NUSA TENGGARA TIMUR 157 Pre-Electrified - - - 124.44990 -8.16080 22794 5307060022 ADANG NUSA TENGGARA TIMUR 309 Pre-Electrified - - - 124.44657 -8.16255 22795 5307060022 ADANG NUSA TENGGARA TIMUR 511 Pre-Electrified - - - 124.44529 -8.16640 22796 5307060022 ADANG NUSA TENGGARA TIMUR 850 Pre-Electrified - - - 124.45191 -8.16385 22797 5307060023 ALILA NUSA TENGGARA TIMUR 36 Pre-Electrified - - - 124.45472 -8.15745 22798 5307060023 ALILA NUSA TENGGARA TIMUR 65 MiniGrid Systems 21 17 829 3.8 124.48174 -8.16004 22799 5307060023 ALILA NUSA TENGGARA TIMUR 263 Pre-Electrified - - - 124.45639 -8.15309 22800 5307061001 ALIM MEBUNG NUSA TENGGARA TIMUR 58 Pre-Electrified - - - 124.59607 -8.19813 22801 5307061001 ALIM MEBUNG NUSA TENGGARA TIMUR 183 Pre-Electrified - - - 124.59730 -8.19874 22802 5307061001 ALIM MEBUNG NUSA TENGGARA TIMUR 1 494 Pre-Electrified - - - 124.59328 -8.20261 22803 5307061002 PETLENG NUSA TENGGARA TIMUR 111 Pre-Electrified - - - 124.58938 -8.21192 22804 5307061002 PETLENG NUSA TENGGARA TIMUR 116 Pre-Electrified - - - 124.59034 -8.20914 22805 5307061002 PETLENG NUSA TENGGARA TIMUR 453 Pre-Electrified - - - 124.58243 -8.20517 22806 5307061002 PETLENG NUSA TENGGARA TIMUR 113 Pre-Electrified - - - 124.58872 -8.20388 22807 5307061013 NURBENLELANG NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 124.59784 -8.20531 22808 5307061013 NURBENLELANG NUSA TENGGARA TIMUR 152 Pre-Electrified - - - 124.59832 -8.20153 22809 5307061013 NURBENLELANG NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 124.60743 -8.19780 22810 5307061013 NURBENLELANG NUSA TENGGARA TIMUR 599 Pre-Electrified - - - 124.60284 -8.19754 22811 5307061013 NURBENLELANG NUSA TENGGARA TIMUR 129 Pre-Electrified - - - 124.59587 -8.20261 22812 5307061014 LEMBUR BARAT NUSA TENGGARA TIMUR 53 Pre-Electrified - - - 124.61783 -8.19105 22813 5307061014 LEMBUR BARAT NUSA TENGGARA TIMUR 1 284 Pre-Electrified - - - 124.61048 -8.19813 22814 5307061015 FUNGAFENG NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 124.63245 -8.18148 22815 5307061015 FUNGAFENG NUSA TENGGARA TIMUR 83 Pre-Electrified - - - 124.62592 -8.18667 22816 5307061015 FUNGAFENG NUSA TENGGARA TIMUR 135 Pre-Electrified - - - 124.63652 -8.18003 22817 5307061015 FUNGAFENG NUSA TENGGARA TIMUR 204 Pre-Electrified - - - 124.63014 -8.18259 22818 5307061016 LIKUWATANG NUSA TENGGARA TIMUR 157 Pre-Electrified - - - 124.66993 -8.16388 22819 5307061016 LIKUWATANG NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 124.67381 -8.16461 22820 5307061016 LIKUWATANG NUSA TENGGARA TIMUR 486 Pre-Electrified - - - 124.66545 -8.16697 22821 5307061019 WELAI SELATAN NUSA TENGGARA TIMUR 8 OffGrid Systems 2 1 698 0.4 124.62007 -8.28507 22822 5307061019 WELAI SELATAN NUSA TENGGARA TIMUR 25 MiniGrid Systems 7 5 943 1.3 124.60339 -8.26225 22823 5307061019 WELAI SELATAN NUSA TENGGARA TIMUR 29 MiniGrid Systems 8 6 792 1.5 124.60435 -8.26017 22824 5307062001 PURA BARAT NUSA TENGGARA TIMUR 32 Pre-Electrified - - - 124.31911 -8.29450 22825 5307062001 PURA BARAT NUSA TENGGARA TIMUR 34 Pre-Electrified - - - 124.32583 -8.29466 22826 5307062001 PURA BARAT NUSA TENGGARA TIMUR 229 Pre-Electrified - - - 124.32322 -8.29465 22827 5307062001 PURA BARAT NUSA TENGGARA TIMUR 282 Pre-Electrified - - - 124.31897 -8.29749 22828 5307062004 PURA TIMUR NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 124.36901 -8.29207 22829 5307062004 PURA TIMUR NUSA TENGGARA TIMUR 96 Pre-Electrified - - - 124.36748 -8.28224 22830 5307062004 PURA TIMUR NUSA TENGGARA TIMUR 247 Pre-Electrified - - - 124.37191 -8.28945 22831 5307062005 PURA NUSA TENGGARA TIMUR 176 Pre-Electrified - - - 124.34112 -8.27618 22832 5307062005 PURA NUSA TENGGARA TIMUR 506 Pre-Electrified - - - 124.35518 -8.27634 22833 5307062005 PURA NUSA TENGGARA TIMUR 470 Pre-Electrified - - - 124.34951 -8.27684 22834 5307062006 PURA UTARA NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 124.32437 -8.28910 Annex II – Demand forecast results Page 151 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 22835 5307062006 PURA UTARA NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 124.33364 -8.28432 22836 5307062006 PURA UTARA NUSA TENGGARA TIMUR 94 Pre-Electrified - - - 124.33718 -8.27900 22837 5307062006 PURA UTARA NUSA TENGGARA TIMUR 200 Pre-Electrified - - - 124.32621 -8.28391 22838 5307062006 PURA UTARA NUSA TENGGARA TIMUR 323 Pre-Electrified - - - 124.33027 -8.28284 22839 5307063002 WAIMI NUSA TENGGARA TIMUR 42 MiniGrid Systems 12 10 188 2.2 124.73480 -8.25114 22840 5307063002 WAIMI NUSA TENGGARA TIMUR 19 MiniGrid Systems 6 5 094 1.1 124.72477 -8.22833 22841 5307063004 TULLENG NUSA TENGGARA TIMUR 640 Pre-Electrified - - - 124.74759 -8.16732 22842 5307063004 TULLENG NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 124.75018 -8.16269 22843 5307063005 LEMBUR TIMUR NUSA TENGGARA TIMUR 26 Pre-Electrified - - - 124.74793 -8.15206 22844 5307063005 LEMBUR TIMUR NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 124.68847 -8.15910 22845 5307063005 LEMBUR TIMUR NUSA TENGGARA TIMUR 74 Pre-Electrified - - - 124.73972 -8.15324 22846 5307063005 LEMBUR TIMUR NUSA TENGGARA TIMUR 199 Pre-Electrified - - - 124.73743 -8.15578 22847 5307063005 LEMBUR TIMUR NUSA TENGGARA TIMUR 214 Pre-Electrified - - - 124.74412 -8.15215 22848 5307063005 LEMBUR TIMUR NUSA TENGGARA TIMUR 327 Pre-Electrified - - - 124.69725 -8.15856 22849 5307063005 LEMBUR TIMUR NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 124.74812 -8.16491 22850 5307063006 LUBA NUSA TENGGARA TIMUR 56 Pre-Electrified - - - 124.67913 -8.16329 22851 5308010001 PASIR PUTIH NUSA TENGGARA TIMUR 27 MiniGrid Systems 9 7 641 1.6 123.27054 -8.54198 22852 5308010001 PASIR PUTIH NUSA TENGGARA TIMUR 418 Pre-Electrified - - - 123.25216 -8.49432 22853 5308010004 DUAWUTUN NUSA TENGGARA TIMUR - Pre-Electrified - - - 123.28904 -8.46545 22854 5308010004 DUAWUTUN NUSA TENGGARA TIMUR 1 551 Pre-Electrified - - - 123.28417 -8.47079 22855 5308010005 WUAKERONG NUSA TENGGARA TIMUR 98 Pre-Electrified - - - 123.28951 -8.46491 22856 5308010019 BAOBOLAK NUSA TENGGARA TIMUR 282 Pre-Electrified - - - 123.25281 -8.49312 22857 5308011002 LAMALERA A NUSA TENGGARA TIMUR 394 Pre-Electrified - - - 123.40582 -8.57727 22858 5308011003 LAMALERA B NUSA TENGGARA TIMUR 187 Pre-Electrified - - - 123.41419 -8.57601 22859 5308011003 LAMALERA B NUSA TENGGARA TIMUR 51 Pre-Electrified - - - 123.41567 -8.57456 22860 5308011003 LAMALERA B NUSA TENGGARA TIMUR 236 Pre-Electrified - - - 123.41368 -8.57004 22861 5308011003 LAMALERA B NUSA TENGGARA TIMUR 25 Pre-Electrified - - - 123.42365 -8.57362 22862 5308011003 LAMALERA B NUSA TENGGARA TIMUR 61 Pre-Electrified - - - 123.41860 -8.55443 22863 5308011005 PUOR NUSA TENGGARA TIMUR 84 Pre-Electrified - - - 123.37405 -8.50652 22864 5308011005 PUOR NUSA TENGGARA TIMUR 361 Pre-Electrified - - - 123.37825 -8.50873 22865 5308011007 WULANDONI NUSA TENGGARA TIMUR 3 Pre-Electrified - - - 123.42946 -8.56450 22866 5308020004 LUSILAME NUSA TENGGARA TIMUR 4 OffGrid Systems 2 1 698 0.4 123.51454 -8.51859 22867 5308020004 LUSILAME NUSA TENGGARA TIMUR 34 MiniGrid Systems 13 11 037 2.4 123.50997 -8.53831 22868 5308020007 DULIR NUSA TENGGARA TIMUR - Pre-Electrified - - - 123.55796 -8.55856 22869 5308020013 DORI PEWUT NUSA TENGGARA TIMUR 53 MiniGrid Systems 16 13 584 2.9 123.50202 -8.46764 22870 5308030001 KOLONTOBO NUSA TENGGARA TIMUR 150 Pre-Electrified - - - 123.46389 -8.32060 22871 5308030001 KOLONTOBO NUSA TENGGARA TIMUR 206 Pre-Electrified - - - 123.46656 -8.32310 22872 5308030001 KOLONTOBO NUSA TENGGARA TIMUR 218 Pre-Electrified - - - 123.47225 -8.32040 22873 5308030001 KOLONTOBO NUSA TENGGARA TIMUR 693 Pre-Electrified - - - 123.45885 -8.31380 22874 5308030002 LARANWUNTUN NUSA TENGGARA TIMUR 91 Pre-Electrified - - - 123.47292 -8.33020 22875 5308030002 LARANWUNTUN NUSA TENGGARA TIMUR 399 Pre-Electrified - - - 123.47641 -8.32964 22876 5308030002 LARANWUNTUN NUSA TENGGARA TIMUR 127 Pre-Electrified - - - 123.46768 -8.32411 22877 5308030002 LARANWUNTUN NUSA TENGGARA TIMUR 604 Pre-Electrified - - - 123.47202 -8.32155 22878 5308030003 MURUONA NUSA TENGGARA TIMUR 598 Pre-Electrified - - - 123.47102 -8.34570 22879 5308030004 WATODIRI NUSA TENGGARA TIMUR 430 Pre-Electrified - - - 123.50958 -8.32180 22880 5308030004 WATODIRI NUSA TENGGARA TIMUR 167 Pre-Electrified - - - 123.50132 -8.33281 22881 5308030013 NAPASABOK NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 123.49957 -8.24157 22882 5308030013 NAPASABOK NUSA TENGGARA TIMUR 23 Pre-Electrified - - - 123.50024 -8.24148 22883 5308030014 BUNGAMUDA NUSA TENGGARA TIMUR 173 Pre-Electrified - - - 123.49381 -8.24541 22884 5308030014 BUNGAMUDA NUSA TENGGARA TIMUR 304 Pre-Electrified - - - 123.49484 -8.24265 22885 5308030015 AMAKAKA NUSA TENGGARA TIMUR 574 Pre-Electrified - - - 123.47729 -8.25307 22886 5308030015 AMAKAKA NUSA TENGGARA TIMUR 546 Pre-Electrified - - - 123.48628 -8.24569 22887 5308030016 TANJUNG BATU NUSA TENGGARA TIMUR 155 Pre-Electrified - - - 123.47442 -8.25628 22888 5308030016 TANJUNG BATU NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 123.46919 -8.26217 22889 5308030016 TANJUNG BATU NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 123.46545 -8.26902 22890 5308030016 TANJUNG BATU NUSA TENGGARA TIMUR 178 Pre-Electrified - - - 123.46912 -8.26496 22891 5308030017 PETUNTAWA NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 123.45061 -8.30145 22892 5308030017 PETUNTAWA NUSA TENGGARA TIMUR 339 Pre-Electrified - - - 123.45327 -8.30525 22893 5308030017 PETUNTAWA NUSA TENGGARA TIMUR 413 Pre-Electrified - - - 123.45241 -8.30106 22894 5308030017 PETUNTAWA NUSA TENGGARA TIMUR 205 Pre-Electrified - - - 123.45698 -8.31148 22895 5308030018 WAOWALA NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 123.45642 -8.27329 22896 5308030018 WAOWALA NUSA TENGGARA TIMUR 17 Pre-Electrified - - - 123.46401 -8.26903 22897 5308030018 WAOWALA NUSA TENGGARA TIMUR 493 Pre-Electrified - - - 123.46051 -8.27130 22898 5308030023 LAMAWARA NUSA TENGGARA TIMUR 361 Pre-Electrified - - - 123.48848 -8.24513 22899 5308031001 TODANARA NUSA TENGGARA TIMUR 77 Pre-Electrified - - - 123.51209 -8.31865 22900 5308031001 TODANARA NUSA TENGGARA TIMUR 98 Pre-Electrified - - - 123.50812 -8.31443 22901 5308031001 TODANARA NUSA TENGGARA TIMUR - Pre-Electrified - - - 123.50874 -8.29325 22902 5308031001 TODANARA NUSA TENGGARA TIMUR 97 Pre-Electrified - - - 123.51382 -8.31640 22903 5308031001 TODANARA NUSA TENGGARA TIMUR 275 Pre-Electrified - - - 123.51018 -8.32015 22904 5308031001 TODANARA NUSA TENGGARA TIMUR 15 Pre-Electrified - - - 123.51624 -8.31026 22905 5308031002 JONTONA NUSA TENGGARA TIMUR 58 MiniGrid Systems 15 12 735 2.7 123.53105 -8.29410 22906 5308031002 JONTONA NUSA TENGGARA TIMUR 165 Pre-Electrified - - - 123.51489 -8.30745 22907 5308031008 LAMAGUTE NUSA TENGGARA TIMUR 217 OffGrid Systems 1 849 0.2 123.51257 -8.24053 22908 5308040001 LAMATUKA NUSA TENGGARA TIMUR 69 Pre-Electrified - - - 123.49972 -8.36226 22909 5308040001 LAMATUKA NUSA TENGGARA TIMUR 250 Pre-Electrified - - - 123.49638 -8.36436 22910 5308040001 LAMATUKA NUSA TENGGARA TIMUR 134 Pre-Electrified - - - 123.50054 -8.36290 22911 5308040002 BAOPANA NUSA TENGGARA TIMUR 371 Pre-Electrified - - - 123.50201 -8.36092 22912 5308040002 BAOPANA NUSA TENGGARA TIMUR 294 Pre-Electrified - - - 123.52393 -8.36669 22913 5308040003 MERDEKA NUSA TENGGARA TIMUR 83 Pre-Electrified - - - 123.54429 -8.36992 22914 5308040003 MERDEKA NUSA TENGGARA TIMUR 25 Pre-Electrified - - - 123.54523 -8.37130 22915 5308040003 MERDEKA NUSA TENGGARA TIMUR 573 Pre-Electrified - - - 123.52699 -8.36592 22916 5308040004 HADAKEWA NUSA TENGGARA TIMUR 195 Pre-Electrified - - - 123.55733 -8.37001 22917 5308040004 HADAKEWA NUSA TENGGARA TIMUR 180 Pre-Electrified - - - 123.56050 -8.36890 22918 5308040004 HADAKEWA NUSA TENGGARA TIMUR 500 Pre-Electrified - - - 123.54974 -8.37001 22919 5308040005 LERAHINGA NUSA TENGGARA TIMUR 32 MiniGrid Systems 9 7 641 1.6 123.56942 -8.39806 Annex II – Demand forecast results Page 152 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 22920 5308040005 LERAHINGA NUSA TENGGARA TIMUR 330 Pre-Electrified - - - 123.57155 -8.36496 22921 5308050009 LEWOLEBA UTARA NUSA TENGGARA TIMUR 649 Pre-Electrified - - - 123.40335 -8.37049 22922 5308050009 LEWOLEBA UTARA NUSA TENGGARA TIMUR 194 Pre-Electrified - - - 123.41228 -8.37358 22923 5308050010 LEWOLEBA NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 123.40848 -8.38486 22924 5308050010 LEWOLEBA NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 123.40253 -8.38082 22925 5308050010 LEWOLEBA NUSA TENGGARA TIMUR 51 Pre-Electrified - - - 123.40504 -8.38188 22926 5308050010 LEWOLEBA NUSA TENGGARA TIMUR 25 Pre-Electrified - - - 123.40968 -8.38682 22927 5308050010 LEWOLEBA NUSA TENGGARA TIMUR 354 Pre-Electrified - - - 123.40881 -8.39114 22928 5308050010 LEWOLEBA NUSA TENGGARA TIMUR 545 Pre-Electrified - - - 123.40780 -8.37995 22929 5308050010 LEWOLEBA NUSA TENGGARA TIMUR 3 040 Pre-Electrified - - - 123.40552 -8.38982 22930 5308050011 LEWOLEBA TENGAH NUSA TENGGARA TIMUR 10 Pre-Electrified - - - 123.42689 -8.38280 22931 5308050011 LEWOLEBA TENGAH NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 123.41021 -8.38437 22932 5308050011 LEWOLEBA TENGAH NUSA TENGGARA TIMUR 13 Pre-Electrified - - - 123.41218 -8.38185 22933 5308050011 LEWOLEBA TENGAH NUSA TENGGARA TIMUR 11 Pre-Electrified - - - 123.41028 -8.38667 22934 5308050011 LEWOLEBA TENGAH NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 123.42074 -8.37638 22935 5308050011 LEWOLEBA TENGAH NUSA TENGGARA TIMUR 34 Pre-Electrified - - - 123.42013 -8.38734 22936 5308050011 LEWOLEBA TENGAH NUSA TENGGARA TIMUR 97 Pre-Electrified - - - 123.41024 -8.38233 22937 5308050011 LEWOLEBA TENGAH NUSA TENGGARA TIMUR 85 Pre-Electrified - - - 123.43104 -8.37538 22938 5308050011 LEWOLEBA TENGAH NUSA TENGGARA TIMUR 1 079 Pre-Electrified - - - 123.41559 -8.37753 22939 5308050011 LEWOLEBA TENGAH NUSA TENGGARA TIMUR 453 Pre-Electrified - - - 123.43134 -8.37329 22940 5308050011 LEWOLEBA TENGAH NUSA TENGGARA TIMUR 1 958 Pre-Electrified - - - 123.41836 -8.37214 22941 5308050017 SELANDORO NUSA TENGGARA TIMUR 715 Pre-Electrified - - - 123.43979 -8.36934 22942 5308050017 SELANDORO NUSA TENGGARA TIMUR 4 165 Pre-Electrified - - - 123.45119 -8.36800 22943 5308060006 MAHAL II NUSA TENGGARA TIMUR 82 Pre-Electrified - - - 123.78291 -8.27228 22944 5308060006 MAHAL II NUSA TENGGARA TIMUR 118 OffGrid Systems 2 1 698 0.4 123.77477 -8.27466 22945 5308060007 NORMAL NUSA TENGGARA TIMUR 69 Pre-Electrified - - - 123.78459 -8.23690 22946 5308060008 LEUDANUNG NUSA TENGGARA TIMUR 99 Pre-Electrified - - - 123.74269 -8.21345 22947 5308060008 LEUDANUNG NUSA TENGGARA TIMUR 12 Pre-Electrified - - - 123.74315 -8.21522 22948 5308060008 LEUDANUNG NUSA TENGGARA TIMUR 1 OffGrid Systems 1 849 0.2 123.75641 -8.20720 22949 5308060008 LEUDANUNG NUSA TENGGARA TIMUR 156 Pre-Electrified - - - 123.76556 -8.24520 22950 5308060008 LEUDANUNG NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 123.77555 -8.24573 22951 5308060008 LEUDANUNG NUSA TENGGARA TIMUR 1 OffGrid Systems 1 849 0.2 123.75005 -8.19780 22952 5308060009 LEUWAYANG NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 123.74794 -8.24126 22953 5308060009 LEUWAYANG NUSA TENGGARA TIMUR 292 Pre-Electrified - - - 123.74168 -8.23222 22954 5308060009 LEUWAYANG NUSA TENGGARA TIMUR 25 Pre-Electrified - - - 123.73658 -8.21944 22955 5308060009 LEUWAYANG NUSA TENGGARA TIMUR 55 MiniGrid Systems 17 14 433 3.1 123.72522 -8.21281 22956 5308060009 LEUWAYANG NUSA TENGGARA TIMUR 86 Pre-Electrified - - - 123.74099 -8.21344 22957 5308060009 LEUWAYANG NUSA TENGGARA TIMUR 339 Pre-Electrified - - - 123.74099 -8.21690 22958 5308060009 LEUWAYANG NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 123.75219 -8.24469 22959 5308060009 LEUWAYANG NUSA TENGGARA TIMUR 86 Pre-Electrified - - - 123.76417 -8.24658 22960 5308060009 LEUWAYANG NUSA TENGGARA TIMUR 44 Pre-Electrified - - - 123.75463 -8.24610 22961 5308060009 LEUWAYANG NUSA TENGGARA TIMUR 8 Pre-Electrified - - - 123.75112 -8.24443 22962 5308060009 LEUWAYANG NUSA TENGGARA TIMUR 151 Pre-Electrified - - - 123.75825 -8.24776 22963 5308060010 ROMA NUSA TENGGARA TIMUR 13 Pre-Electrified - - - 123.74590 -8.25135 22964 5308060010 ROMA NUSA TENGGARA TIMUR 69 Pre-Electrified - - - 123.74839 -8.25315 22965 5308060010 ROMA NUSA TENGGARA TIMUR 136 Pre-Electrified - - - 123.74617 -8.24150 22966 5308060010 ROMA NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 123.74687 -8.24634 22967 5308060010 ROMA NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 123.74962 -8.24415 22968 5308060010 ROMA NUSA TENGGARA TIMUR 162 Pre-Electrified - - - 123.74455 -8.24575 22969 5308060010 ROMA NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 123.75112 -8.24560 22970 5308060011 HOELEA II NUSA TENGGARA TIMUR 171 Pre-Electrified - - - 123.70927 -8.22402 22971 5308060011 HOELEA II NUSA TENGGARA TIMUR 418 Pre-Electrified - - - 123.71414 -8.23151 22972 5308060012 HOELEA NUSA TENGGARA TIMUR 980 Pre-Electrified - - - 123.71445 -8.23854 22973 5308060017 BALAURING NUSA TENGGARA TIMUR 951 Pre-Electrified - - - 123.70390 -8.25036 22974 5308060017 BALAURING NUSA TENGGARA TIMUR 833 Pre-Electrified - - - 123.70414 -8.24977 22975 5308060021 NORMAL I NUSA TENGGARA TIMUR 2 OffGrid Systems 1 849 0.2 123.75644 -8.20696 22976 5308060021 NORMAL I NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 123.78018 -8.24382 22977 5308060021 NORMAL I NUSA TENGGARA TIMUR 55 Pre-Electrified - - - 123.78048 -8.24634 22978 5308060021 NORMAL I NUSA TENGGARA TIMUR 85 Pre-Electrified - - - 123.77761 -8.24463 22979 5308070001 PANAMA NUSA TENGGARA TIMUR 1 307 Pre-Electrified - - - 123.78648 -8.23915 22980 5308070001 PANAMA NUSA TENGGARA TIMUR 232 Pre-Electrified - - - 123.78919 -8.23841 22981 5308070003 BENIHADING NUSA TENGGARA TIMUR 632 Pre-Electrified - - - 123.79557 -8.23450 22982 5308070004 BENIHADING II NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 123.79137 -8.24164 22983 5308070004 BENIHADING II NUSA TENGGARA TIMUR 1 196 Pre-Electrified - - - 123.79228 -8.23829 22984 5308070005 ATULALENG NUSA TENGGARA TIMUR 309 Pre-Electrified - - - 123.79881 -8.22983 22985 5308070005 ATULALENG NUSA TENGGARA TIMUR 304 Pre-Electrified - - - 123.80422 -8.23146 22986 5308070006 TUBUNG WALANG NUSA TENGGARA TIMUR 85 Pre-Electrified - - - 123.80785 -8.23057 22987 5308070006 TUBUNG WALANG NUSA TENGGARA TIMUR 300 Pre-Electrified - - - 123.80518 -8.23037 22988 5308070006 TUBUNG WALANG NUSA TENGGARA TIMUR 20 Pre-Electrified - - - 123.80993 -8.23154 22989 5308070007 ROHO NUSA TENGGARA TIMUR 3 Pre-Electrified - - - 123.81599 -8.22975 22990 5308070007 ROHO NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 123.81327 -8.22998 22991 5308070007 ROHO NUSA TENGGARA TIMUR 818 Pre-Electrified - - - 123.80927 -8.22829 22992 5308070008 LOYOBOHOR NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 123.81599 -8.22917 22993 5308070008 LOYOBOHOR NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 123.81863 -8.22376 22994 5308070008 LOYOBOHOR NUSA TENGGARA TIMUR 142 Pre-Electrified - - - 123.81316 -8.22138 22995 5308070008 LOYOBOHOR NUSA TENGGARA TIMUR 2 OffGrid Systems 1 849 0.2 123.82394 -8.22547 22996 5308070008 LOYOBOHOR NUSA TENGGARA TIMUR 875 Pre-Electrified - - - 123.81364 -8.22426 22997 5308070009 LEUBURI NUSA TENGGARA TIMUR 3 Pre-Electrified - - - 123.81639 -8.21428 22998 5308070009 LEUBURI NUSA TENGGARA TIMUR 1 022 Pre-Electrified - - - 123.81442 -8.21969 22999 5308070010 TOBOTANI NUSA TENGGARA TIMUR 162 MiniGrid Systems 50 42 450 9.2 123.87034 -8.26553 23000 5308070010 TOBOTANI NUSA TENGGARA TIMUR 8 OffGrid Systems 3 2 547 0.5 123.90167 -8.25011 23001 5308070010 TOBOTANI NUSA TENGGARA TIMUR 30 MiniGrid Systems 10 8 490 1.8 123.86211 -8.22799 23002 5308070010 TOBOTANI NUSA TENGGARA TIMUR 11 OffGrid Systems 4 3 396 0.7 123.90121 -8.24974 23003 5308070010 TOBOTANI NUSA TENGGARA TIMUR 11 OffGrid Systems 4 3 396 0.7 123.89921 -8.24194 23004 5308070010 TOBOTANI NUSA TENGGARA TIMUR 115 MiniGrid Systems 36 30 564 6.6 123.90777 -8.22327 Annex II – Demand forecast results Page 153 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 23005 5308070012 KAOHUA NUSA TENGGARA TIMUR 16 Pre-Electrified - - - 123.81619 -8.21394 23006 5308070012 KAOHUA NUSA TENGGARA TIMUR 278 Pre-Electrified - - - 123.81777 -8.20601 23007 5308070012 KAOHUA NUSA TENGGARA TIMUR 423 Pre-Electrified - - - 123.81578 -8.21082 23008 5308070013 UMALEU NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 123.81901 -8.19079 23009 5308070013 UMALEU NUSA TENGGARA TIMUR 618 Pre-Electrified - - - 123.81200 -8.18950 23010 5308070013 UMALEU NUSA TENGGARA TIMUR 180 Pre-Electrified - - - 123.81191 -8.18678 23011 5308070013 UMALEU NUSA TENGGARA TIMUR 1 177 Pre-Electrified - - - 123.81910 -8.19205 23012 5308070020 ATU WALUPANG NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 123.79837 -8.23017 23013 5308070020 ATU WALUPANG NUSA TENGGARA TIMUR 387 Pre-Electrified - - - 123.79782 -8.23269 23014 5309010009 NAWOKOTE NUSA TENGGARA TIMUR 574 Pre-Electrified - - - 122.72693 -8.55816 23015 5309010009 NAWOKOTE NUSA TENGGARA TIMUR 658 Pre-Electrified - - - 122.72843 -8.55078 23016 5309010011 BORU NUSA TENGGARA TIMUR 358 Pre-Electrified - - - 122.70727 -8.52614 23017 5309010011 BORU NUSA TENGGARA TIMUR 1 380 Pre-Electrified - - - 122.70707 -8.52273 23018 5309010011 BORU NUSA TENGGARA TIMUR 266 Pre-Electrified - - - 122.71525 -8.53432 23019 5309010011 BORU NUSA TENGGARA TIMUR 840 Pre-Electrified - - - 122.69758 -8.52731 23020 5309010012 HOKENG JAYA NUSA TENGGARA TIMUR 917 Pre-Electrified - - - 122.73044 -8.52178 23021 5309010012 HOKENG JAYA NUSA TENGGARA TIMUR 524 Pre-Electrified - - - 122.72223 -8.52743 23022 5309010012 HOKENG JAYA NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 122.72357 -8.51969 23023 5309010012 HOKENG JAYA NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 122.72806 -8.52033 23024 5309010014 PULULERA NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 122.73233 -8.51980 23025 5309010014 PULULERA NUSA TENGGARA TIMUR 1 040 Pre-Electrified - - - 122.71380 -8.50323 23026 5309010014 PULULERA NUSA TENGGARA TIMUR 32 Pre-Electrified - - - 122.72338 -8.51897 23027 5309010014 PULULERA NUSA TENGGARA TIMUR 138 Pre-Electrified - - - 122.72364 -8.51758 23028 5309010014 PULULERA NUSA TENGGARA TIMUR 61 Pre-Electrified - - - 122.72877 -8.51990 23029 5309010016 KLATANLO NUSA TENGGARA TIMUR 1 309 Pre-Electrified - - - 122.73126 -8.52300 23030 5309011004 KONGA NUSA TENGGARA TIMUR 25 MiniGrid Systems 6 5 094 1.1 122.80062 -8.44686 23031 5309011006 LEWOLAGA NUSA TENGGARA TIMUR 1 301 MiniGrid Systems 23 19 527 4.2 122.80913 -8.42085 23032 5309011007 LEWOINGU NUSA TENGGARA TIMUR 3 OffGrid Systems 1 849 0.2 122.81134 -8.41871 23033 5309012004 NURRI NUSA TENGGARA TIMUR 215 Pre-Electrified - - - 122.73511 -8.51888 23034 5309012004 NURRI NUSA TENGGARA TIMUR 110 Pre-Electrified - - - 122.73934 -8.51460 23035 5309012007 DULIPALI NUSA TENGGARA TIMUR 23 Pre-Electrified - - - 122.74957 -8.50474 23036 5309012007 DULIPALI NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 122.75126 -8.50349 23037 5309020010 SINAMALAKA NUSA TENGGARA TIMUR 832 Pre-Electrified - - - 122.92806 -8.18890 23038 5309020010 SINAMALAKA NUSA TENGGARA TIMUR 99 Pre-Electrified - - - 122.91835 -8.18353 23039 5309020011 RATU LODONG NUSA TENGGARA TIMUR 1 496 Pre-Electrified - - - 122.89662 -8.17474 23040 5309020011 RATU LODONG NUSA TENGGARA TIMUR 341 Pre-Electrified - - - 122.88895 -8.17209 23041 5309020012 SINA HADIGALA NUSA TENGGARA TIMUR 139 Pre-Electrified - - - 122.87534 -8.17524 23042 5309020021 ARAN SINA NUSA TENGGARA TIMUR 1 OffGrid Systems 1 849 0.2 122.84324 -8.09658 23043 5309021003 BANTALA NUSA TENGGARA TIMUR 1 373 Pre-Electrified - - - 122.91901 -8.29156 23044 5309021003 BANTALA NUSA TENGGARA TIMUR 6 OffGrid Systems 2 1 698 0.4 122.89693 -8.31606 23045 5309021005 SINAR HADING NUSA TENGGARA TIMUR 126 Pre-Electrified - - - 122.89920 -8.27451 23046 5309021006 PAINAPANG NUSA TENGGARA TIMUR 724 Pre-Electrified - - - 122.92606 -8.28696 23047 5309030007 MOKANTARAK NUSA TENGGARA TIMUR 749 Pre-Electrified - - - 122.90766 -8.34162 23048 5309030007 MOKANTARAK NUSA TENGGARA TIMUR 465 Pre-Electrified - - - 122.90820 -8.33689 23049 5309030010 LAMAWALANG NUSA TENGGARA TIMUR 837 Pre-Electrified - - - 122.93284 -8.33300 23050 5309030011 WAIBALUN NUSA TENGGARA TIMUR 2 893 Pre-Electrified - - - 122.95583 -8.34633 23051 5309030012 LEWOLERE NUSA TENGGARA TIMUR 1 481 Pre-Electrified - - - 122.95965 -8.34848 23052 5309030012 LEWOLERE NUSA TENGGARA TIMUR 815 Pre-Electrified - - - 122.96384 -8.35018 23053 5309030013 PANTAI BESAR NUSA TENGGARA TIMUR 1 211 Pre-Electrified - - - 122.96952 -8.34834 23054 5309030014 LARANTUKA NUSA TENGGARA TIMUR 1 160 Pre-Electrified - - - 122.97726 -8.34676 23055 5309030015 BALELA NUSA TENGGARA TIMUR 1 142 Pre-Electrified - - - 122.98046 -8.34494 23056 5309030016 POHON SIRIH NUSA TENGGARA TIMUR 707 Pre-Electrified - - - 122.98250 -8.34409 23057 5309030017 LOHAYONG NUSA TENGGARA TIMUR 581 Pre-Electrified - - - 122.98471 -8.34225 23058 5309030018 LOKEA NUSA TENGGARA TIMUR 1 610 Pre-Electrified - - - 122.98646 -8.34076 23059 5309030019 POSTOH NUSA TENGGARA TIMUR 2 010 Pre-Electrified - - - 122.99020 -8.33831 23060 5309030020 AMAGARAPATI NUSA TENGGARA TIMUR 2 381 Pre-Electrified - - - 122.99377 -8.33468 23061 5309030021 EKASAPTA NUSA TENGGARA TIMUR 2 053 Pre-Electrified - - - 122.99742 -8.33369 23062 5309030021 EKASAPTA NUSA TENGGARA TIMUR 1 039 Pre-Electrified - - - 123.00178 -8.33115 23063 5309030021 EKASAPTA NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 123.00001 -8.32904 23064 5309030022 PUKEN TOBI WANGI BAO NUSA TENGGARA TIMUR 26 Pre-Electrified - - - 122.99954 -8.32822 23065 5309030022 PUKEN TOBI WANGI BAO NUSA TENGGARA TIMUR 2 549 Pre-Electrified - - - 123.00467 -8.32745 23066 5309030022 PUKEN TOBI WANGI BAO NUSA TENGGARA TIMUR - Pre-Electrified - - - 123.00001 -8.32839 23067 5309030023 SAROTARI NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 123.01768 -8.30894 23068 5309030023 SAROTARI NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 123.01907 -8.30497 23069 5309030023 SAROTARI NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 123.01904 -8.30684 23070 5309030023 SAROTARI NUSA TENGGARA TIMUR 190 Pre-Electrified - - - 123.01670 -8.30358 23071 5309030023 SAROTARI NUSA TENGGARA TIMUR 1 191 Pre-Electrified - - - 123.01585 -8.31646 23072 5309030023 SAROTARI NUSA TENGGARA TIMUR 583 Pre-Electrified - - - 123.00772 -8.32198 23073 5309030024 WERI NUSA TENGGARA TIMUR 403 Pre-Electrified - - - 123.01344 -8.30159 23074 5309030024 WERI NUSA TENGGARA TIMUR 1 872 Pre-Electrified - - - 123.01738 -8.30192 23075 5309031001 LEWOLOBA NUSA TENGGARA TIMUR 1 162 Pre-Electrified - - - 122.92723 -8.32668 23076 5309031002 WAILOLONG NUSA TENGGARA TIMUR 1 455 Pre-Electrified - - - 122.92631 -8.31561 23077 5309031002 WAILOLONG NUSA TENGGARA TIMUR 64 Pre-Electrified - - - 122.91799 -8.32519 23078 5309031003 RIANG KEMIE NUSA TENGGARA TIMUR 1 675 Pre-Electrified - - - 122.94781 -8.28769 23079 5309031003 RIANG KEMIE NUSA TENGGARA TIMUR 124 Pre-Electrified - - - 122.94282 -8.28978 23080 5309031004 LEWOHALA NUSA TENGGARA TIMUR 1 278 Pre-Electrified - - - 122.95420 -8.28360 23081 5309031005 HALAKODANUAN NUSA TENGGARA TIMUR 347 Pre-Electrified - - - 122.98227 -8.23593 23082 5309031006 WATOTUTU NUSA TENGGARA TIMUR 604 Pre-Electrified - - - 122.98104 -8.25081 23083 5309031006 WATOTUTU NUSA TENGGARA TIMUR 203 Pre-Electrified - - - 122.97900 -8.27655 23084 5309031006 WATOTUTU NUSA TENGGARA TIMUR 128 Pre-Electrified - - - 122.96389 -8.27523 23085 5309031006 WATOTUTU NUSA TENGGARA TIMUR 230 Pre-Electrified - - - 122.98108 -8.24919 23086 5309031007 MUDAKEPUTU NUSA TENGGARA TIMUR 437 Pre-Electrified - - - 122.98115 -8.27696 23087 5309031007 MUDAKEPUTU NUSA TENGGARA TIMUR 138 Pre-Electrified - - - 122.99553 -8.26901 23088 5309031007 MUDAKEPUTU NUSA TENGGARA TIMUR 261 Pre-Electrified - - - 122.99366 -8.27072 23089 5309031008 TIWATOBI NUSA TENGGARA TIMUR 51 Pre-Electrified - - - 122.99593 -8.26911 Annex II – Demand forecast results Page 154 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 23090 5309031008 TIWATOBI NUSA TENGGARA TIMUR 331 Pre-Electrified - - - 122.99946 -8.27588 23091 5309031008 TIWATOBI NUSA TENGGARA TIMUR 100 Pre-Electrified - - - 122.99694 -8.27067 23092 5309031008 TIWATOBI NUSA TENGGARA TIMUR 757 Pre-Electrified - - - 123.00121 -8.27642 23093 5309032002 KAWALELO NUSA TENGGARA TIMUR 168 MiniGrid Systems 51 43 299 9.3 122.88380 -8.44807 23094 5309032004 LEWOKLUOK NUSA TENGGARA TIMUR 59 MiniGrid Systems 17 14 433 3.1 122.81265 -8.30248 23095 5309032006 BAMA NUSA TENGGARA TIMUR 10 OffGrid Systems 3 2 547 0.5 122.88449 -8.36930 23096 5309040010 KARAWATUNG NUSA TENGGARA TIMUR - Pre-Electrified - - - 123.02522 -8.44621 23097 5309040010 KARAWATUNG NUSA TENGGARA TIMUR 500 Pre-Electrified - - - 123.01733 -8.45120 23098 5309040011 ONGALERENG NUSA TENGGARA TIMUR 958 Pre-Electrified - - - 123.00847 -8.44500 23099 5309040012 PAMAKAYO NUSA TENGGARA TIMUR 659 Pre-Electrified - - - 122.98616 -8.43655 23100 5309041001 SULENGWASENG NUSA TENGGARA TIMUR 30 MiniGrid Systems 7 5 943 1.3 122.97195 -8.52478 23101 5309041002 KENERE NUSA TENGGARA TIMUR 433 Pre-Electrified - - - 122.99349 -8.49857 23102 5309041003 LEMANU NUSA TENGGARA TIMUR 156 Pre-Electrified - - - 122.99926 -8.49342 23103 5309041003 LEMANU NUSA TENGGARA TIMUR 640 Pre-Electrified - - - 123.00219 -8.49204 23104 5309041004 KALIKE NUSA TENGGARA TIMUR 769 Pre-Electrified - - - 123.01777 -8.47870 23105 5309041005 KALIKE AIMATAN NUSA TENGGARA TIMUR 675 Pre-Electrified - - - 123.01886 -8.47705 23106 5309041006 LEWOGRARAN NUSA TENGGARA TIMUR 684 Pre-Electrified - - - 123.02998 -8.47479 23107 5309041007 BUBU ATAGAMU NUSA TENGGARA TIMUR 946 Pre-Electrified - - - 123.03166 -8.47835 23108 5309050010 MOTONWUTUN NUSA TENGGARA TIMUR 907 Pre-Electrified - - - 123.16470 -8.43576 23109 5309050011 WATOBUKU NUSA TENGGARA TIMUR 235 Pre-Electrified - - - 123.15542 -8.43799 23110 5309050011 WATOBUKU NUSA TENGGARA TIMUR 1 093 Pre-Electrified - - - 123.16287 -8.43291 23111 5309050012 LABELEN NUSA TENGGARA TIMUR 124 Pre-Electrified - - - 123.13660 -8.42728 23112 5309050012 LABELEN NUSA TENGGARA TIMUR 121 Pre-Electrified - - - 123.13238 -8.42892 23113 5309050012 LABELEN NUSA TENGGARA TIMUR 337 Pre-Electrified - - - 123.13077 -8.42886 23114 5309050013 KAWUTA NUSA TENGGARA TIMUR 514 Pre-Electrified - - - 123.11167 -8.43543 23115 5309050014 MENANGA NUSA TENGGARA TIMUR 1 456 Pre-Electrified - - - 123.08516 -8.43602 23116 5309050016 LOHAYONG NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 123.07496 -8.43815 23117 5309050016 LOHAYONG NUSA TENGGARA TIMUR 53 Pre-Electrified - - - 123.07003 -8.43708 23118 5309050016 LOHAYONG NUSA TENGGARA TIMUR 154 Pre-Electrified - - - 123.07292 -8.43501 23119 5309050016 LOHAYONG NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 123.06959 -8.43473 23120 5309050016 LOHAYONG NUSA TENGGARA TIMUR 256 Pre-Electrified - - - 123.07289 -8.44002 23121 5309050016 LOHAYONG NUSA TENGGARA TIMUR 432 Pre-Electrified - - - 123.07841 -8.43576 23122 5309050017 LOHAYONG II NUSA TENGGARA TIMUR 371 Pre-Electrified - - - 123.06641 -8.43458 23123 5309050017 LOHAYONG II NUSA TENGGARA TIMUR 280 Pre-Electrified - - - 123.05402 -8.43568 23124 5309050017 LOHAYONG II NUSA TENGGARA TIMUR 102 Pre-Electrified - - - 123.06923 -8.43768 23125 5309050017 LOHAYONG II NUSA TENGGARA TIMUR 901 Pre-Electrified - - - 123.06833 -8.43439 23126 5309050018 WULUBLOLONG NUSA TENGGARA TIMUR 75 Pre-Electrified - - - 123.03629 -8.43864 23127 5309050018 WULUBLOLONG NUSA TENGGARA TIMUR 914 Pre-Electrified - - - 123.04363 -8.43946 23128 5309050019 LEWOHEDO NUSA TENGGARA TIMUR 452 Pre-Electrified - - - 123.02734 -8.44750 23129 5309060010 WUREH NUSA TENGGARA TIMUR 428 Pre-Electrified - - - 123.04186 -8.30601 23130 5309060011 BUGALIMA NUSA TENGGARA TIMUR 535 Pre-Electrified - - - 123.05673 -8.29841 23131 5309060012 KIMA KAMAK NUSA TENGGARA TIMUR 144 Pre-Electrified - - - 123.06058 -8.29525 23132 5309060012 KIMA KAMAK NUSA TENGGARA TIMUR 224 Pre-Electrified - - - 123.06309 -8.29384 23133 5309060018 PAJINIAN NUSA TENGGARA TIMUR 494 Pre-Electrified - - - 123.06848 -8.28894 23134 5309060019 HURUNG NUSA TENGGARA TIMUR 391 Pre-Electrified - - - 123.07883 -8.28372 23135 5309060020 WAIWADAN NUSA TENGGARA TIMUR 354 Pre-Electrified - - - 123.09185 -8.28707 23136 5309060020 WAIWADAN NUSA TENGGARA TIMUR 1 424 Pre-Electrified - - - 123.09087 -8.27766 23137 5309060027 HOMA NUSA TENGGARA TIMUR 10 Pre-Electrified - - - 123.09559 -8.27406 23138 5309060027 HOMA NUSA TENGGARA TIMUR 20 Pre-Electrified - - - 123.10344 -8.27863 23139 5309060027 HOMA NUSA TENGGARA TIMUR 89 Pre-Electrified - - - 123.09980 -8.27386 23140 5309060027 HOMA NUSA TENGGARA TIMUR 293 Pre-Electrified - - - 123.09234 -8.27632 23141 5309060028 DUWANUR NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 123.10381 -8.27194 23142 5309060028 DUWANUR NUSA TENGGARA TIMUR 540 Pre-Electrified - - - 123.11324 -8.26277 23143 5309060028 DUWANUR NUSA TENGGARA TIMUR 91 Pre-Electrified - - - 123.12013 -8.26145 23144 5309060028 DUWANUR NUSA TENGGARA TIMUR 185 Pre-Electrified - - - 123.11112 -8.27126 23145 5309060028 DUWANUR NUSA TENGGARA TIMUR 215 Pre-Electrified - - - 123.12012 -8.26809 23146 5309060040 NIMUN DANI BAO NUSA TENGGARA TIMUR 2 OffGrid Systems 1 849 0.2 123.10969 -8.32756 23147 5309061006 NAYUBAYA NUSA TENGGARA TIMUR 16 OffGrid Systems 4 3 396 0.7 123.05314 -8.38875 23148 5309061010 KLUKENGNUKING NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 123.08426 -8.40372 23149 5309061010 KLUKENGNUKING NUSA TENGGARA TIMUR 1 313 Pre-Electrified - - - 123.08527 -8.39909 23150 5309061011 PANDAI NUSA TENGGARA TIMUR 870 Pre-Electrified - - - 123.09809 -8.39995 23151 5309070001 BLOTO NUSA TENGGARA TIMUR 675 Pre-Electrified - - - 123.10580 -8.40255 23152 5309070002 TERONG NUSA TENGGARA TIMUR 105 Pre-Electrified - - - 123.11941 -8.39468 23153 5309070002 TERONG NUSA TENGGARA TIMUR 377 Pre-Electrified - - - 123.13515 -8.39028 23154 5309070002 TERONG NUSA TENGGARA TIMUR 1 107 Pre-Electrified - - - 123.14108 -8.39121 23155 5309070006 LAMAHALA JAYA NUSA TENGGARA TIMUR 302 Pre-Electrified - - - 123.15724 -8.38770 23156 5309070006 LAMAHALA JAYA NUSA TENGGARA TIMUR 5 494 Pre-Electrified - - - 123.15004 -8.38988 23157 5309070007 WAIWERANG KOTA NUSA TENGGARA TIMUR 4 204 Pre-Electrified - - - 123.16408 -8.38728 23158 5309070008 WAIBURAK NUSA TENGGARA TIMUR 599 Pre-Electrified - - - 123.17747 -8.38399 23159 5309070008 WAIBURAK NUSA TENGGARA TIMUR 2 109 Pre-Electrified - - - 123.17026 -8.38755 23160 5309070009 NARASAOSINA NUSA TENGGARA TIMUR 166 Pre-Electrified - - - 123.16491 -8.37545 23161 5309070009 NARASAOSINA NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 123.16526 -8.37473 23162 5309070012 KIWANG ONA NUSA TENGGARA TIMUR 83 Pre-Electrified - - - 123.18428 -8.36858 23163 5309070012 KIWANG ONA NUSA TENGGARA TIMUR 110 Pre-Electrified - - - 123.18195 -8.37438 23164 5309070012 KIWANG ONA NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 123.20724 -8.34810 23165 5309070012 KIWANG ONA NUSA TENGGARA TIMUR 133 Pre-Electrified - - - 123.20956 -8.34639 23166 5309070012 KIWANG ONA NUSA TENGGARA TIMUR 339 Pre-Electrified - - - 123.20038 -8.36711 23167 5309070012 KIWANG ONA NUSA TENGGARA TIMUR 539 Pre-Electrified - - - 123.20407 -8.34251 23168 5309070013 KARINGLAMALOUK NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 123.21120 -8.34068 23169 5309070013 KARINGLAMALOUK NUSA TENGGARA TIMUR 187 Pre-Electrified - - - 123.21030 -8.34522 23170 5309070013 KARINGLAMALOUK NUSA TENGGARA TIMUR 540 Pre-Electrified - - - 123.21383 -8.33918 23171 5309070014 TUAWOLO NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 123.21253 -8.34805 23172 5309070014 TUAWOLO NUSA TENGGARA TIMUR 497 Pre-Electrified - - - 123.21067 -8.34808 23173 5309070057 PUHU NUSA TENGGARA TIMUR 608 Pre-Electrified - - - 123.20708 -8.32702 23174 5309070058 KWAELAGA LAMAWATO NUSA TENGGARA TIMUR 26 Pre-Electrified - - - 123.20742 -8.33361 Annex II – Demand forecast results Page 155 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 23175 5309070058 KWAELAGA LAMAWATO NUSA TENGGARA TIMUR 61 Pre-Electrified - - - 123.20872 -8.33482 23176 5309070058 KWAELAGA LAMAWATO NUSA TENGGARA TIMUR 132 Pre-Electrified - - - 123.20205 -8.33522 23177 5309070058 KWAELAGA LAMAWATO NUSA TENGGARA TIMUR 135 Pre-Electrified - - - 123.19991 -8.33121 23178 5309071001 LEWO KELENG NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 123.22441 -8.38385 23179 5309071001 LEWO KELENG NUSA TENGGARA TIMUR 438 Pre-Electrified - - - 123.22465 -8.38042 23180 5309071002 BEDALEWUN NUSA TENGGARA TIMUR 544 Pre-Electrified - - - 123.22860 -8.38592 23181 5309071003 LEBANUBA NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 123.23841 -8.37067 23182 5309071003 LEBANUBA NUSA TENGGARA TIMUR 556 Pre-Electrified - - - 123.23961 -8.37197 23183 5309071004 BUNGALAWAN NUSA TENGGARA TIMUR 127 Pre-Electrified - - - 123.24020 -8.37694 23184 5309071004 BUNGALAWAN NUSA TENGGARA TIMUR 141 Pre-Electrified - - - 123.24004 -8.38392 23185 5309071004 BUNGALAWAN NUSA TENGGARA TIMUR 150 Pre-Electrified - - - 123.23751 -8.37591 23186 5309071004 BUNGALAWAN NUSA TENGGARA TIMUR 12 Pre-Electrified - - - 123.24152 -8.37475 23187 5309071004 BUNGALAWAN NUSA TENGGARA TIMUR 138 Pre-Electrified - - - 123.23779 -8.37447 23188 5309071005 RIAWALE NUSA TENGGARA TIMUR 275 Pre-Electrified - - - 123.24008 -8.39052 23189 5309071006 LAMAWOLO NUSA TENGGARA TIMUR 138 Pre-Electrified - - - 123.24649 -8.37749 23190 5309071006 LAMAWOLO NUSA TENGGARA TIMUR 402 Pre-Electrified - - - 123.24880 -8.38622 23191 5309071006 LAMAWOLO NUSA TENGGARA TIMUR 212 Pre-Electrified - - - 123.25276 -8.38629 23192 5309071006 LAMAWOLO NUSA TENGGARA TIMUR 99 Pre-Electrified - - - 123.25066 -8.38625 23193 5309071007 HELANLANGOWUYO NUSA TENGGARA TIMUR 184 Pre-Electrified - - - 123.26262 -8.38453 23194 5309071007 HELANLANGOWUYO NUSA TENGGARA TIMUR 191 Pre-Electrified - - - 123.26037 -8.38557 23195 5309071007 HELANLANGOWUYO NUSA TENGGARA TIMUR 1 130 Pre-Electrified - - - 123.25708 -8.37828 23196 5309071008 LEWOPAO NUSA TENGGARA TIMUR 101 Pre-Electrified - - - 123.26412 -8.38399 23197 5309071008 LEWOPAO NUSA TENGGARA TIMUR 110 Pre-Electrified - - - 123.27017 -8.38270 23198 5309071008 LEWOPAO NUSA TENGGARA TIMUR 1 222 Pre-Electrified - - - 123.26636 -8.38241 23199 5309071009 HARUBALA NUSA TENGGARA TIMUR 52 Pre-Electrified - - - 123.27075 -8.38247 23200 5309071009 HARUBALA NUSA TENGGARA TIMUR 160 Pre-Electrified - - - 123.27227 -8.38247 23201 5309071009 HARUBALA NUSA TENGGARA TIMUR 5 Pre-Electrified - - - 123.27013 -8.37505 23202 5309071009 HARUBALA NUSA TENGGARA TIMUR 319 Pre-Electrified - - - 123.26974 -8.37418 23203 5309071010 NELELAMADIKE NUSA TENGGARA TIMUR 344 Pre-Electrified - - - 123.27588 -8.37297 23204 5309071010 NELELAMADIKE NUSA TENGGARA TIMUR 557 Pre-Electrified - - - 123.27879 -8.37273 23205 5309071011 BOLENG NUSA TENGGARA TIMUR 1 118 Pre-Electrified - - - 123.29557 -8.38303 23206 5309071012 NELERERENG NUSA TENGGARA TIMUR 79 Pre-Electrified - - - 123.29568 -8.37705 23207 5309071012 NELERERENG NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 123.28798 -8.37740 23208 5309071012 NELERERENG NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 123.28626 -8.37940 23209 5309071012 NELERERENG NUSA TENGGARA TIMUR 168 Pre-Electrified - - - 123.29758 -8.37097 23210 5309071013 NELEBLOLONG NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 123.27175 -8.36810 23211 5309071013 NELEBLOLONG NUSA TENGGARA TIMUR - Pre-Electrified - - - 123.28031 -8.36726 23212 5309071013 NELEBLOLONG NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 123.27401 -8.36682 23213 5309071013 NELEBLOLONG NUSA TENGGARA TIMUR 292 Pre-Electrified - - - 123.27851 -8.37126 23214 5309071017 LEWAT NUSA TENGGARA TIMUR 209 Pre-Electrified - - - 123.23299 -8.37738 23215 5309071017 LEWAT NUSA TENGGARA TIMUR 221 Pre-Electrified - - - 123.23473 -8.37610 23216 5309071019 BAYUNTAA NUSA TENGGARA TIMUR 327 Pre-Electrified - - - 123.24200 -8.38414 23217 5309071020 NOBO NUSA TENGGARA TIMUR 364 Pre-Electrified - - - 123.28486 -8.37944 23218 5309071020 NOBO NUSA TENGGARA TIMUR 154 Pre-Electrified - - - 123.28111 -8.36746 23219 5309072001 WATOLOLONG NUSA TENGGARA TIMUR 438 Pre-Electrified - - - 123.25201 -8.31398 23220 5309072003 RIANGDULI NUSA TENGGARA TIMUR 324 Pre-Electrified - - - 123.27910 -8.31448 23221 5309072003 RIANGDULI NUSA TENGGARA TIMUR 188 Pre-Electrified - - - 123.28398 -8.31030 23222 5309072004 PLEDO NUSA TENGGARA TIMUR 1 170 Pre-Electrified - - - 123.26794 -8.29175 23223 5309072005 WATOONE NUSA TENGGARA TIMUR 1 558 Pre-Electrified - - - 123.26386 -8.30466 23224 5309072006 WERANGGERE NUSA TENGGARA TIMUR 578 Pre-Electrified - - - 123.26179 -8.30190 23225 5309072007 ORINGBELE NUSA TENGGARA TIMUR - Pre-Electrified - - - 123.28418 -8.30905 23226 5309072007 ORINGBELE NUSA TENGGARA TIMUR 1 476 Pre-Electrified - - - 123.26527 -8.29980 23227 5309072010 SANDOSI NUSA TENGGARA TIMUR 273 Pre-Electrified - - - 123.27894 -8.28078 23228 5309072010 SANDOSI NUSA TENGGARA TIMUR 1 176 Pre-Electrified - - - 123.27387 -8.28568 23229 5309072011 BALAWELING NUSA TENGGARA TIMUR - Pre-Electrified - - - 123.25840 -8.28651 23230 5309072011 BALAWELING NUSA TENGGARA TIMUR 558 Pre-Electrified - - - 123.26016 -8.28563 23231 5309072012 LAMABLAWA NUSA TENGGARA TIMUR 1 044 Pre-Electrified - - - 123.26169 -8.29939 23232 5309072013 LEWOPULO NUSA TENGGARA TIMUR 167 Pre-Electrified - - - 123.24918 -8.28880 23233 5309072013 LEWOPULO NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 123.25260 -8.28741 23234 5309072013 LEWOPULO NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 123.25013 -8.28848 23235 5309072013 LEWOPULO NUSA TENGGARA TIMUR 201 Pre-Electrified - - - 123.25710 -8.28704 23236 5309072013 LEWOPULO NUSA TENGGARA TIMUR 264 Pre-Electrified - - - 123.25665 -8.28477 23237 5309073001 HORINARA NUSA TENGGARA TIMUR 1 215 Pre-Electrified - - - 123.21989 -8.31577 23238 5309073002 NISAKARANG NUSA TENGGARA TIMUR 264 Pre-Electrified - - - 123.23379 -8.31761 23239 5309073002 NISAKARANG NUSA TENGGARA TIMUR 405 Pre-Electrified - - - 123.23022 -8.32028 23240 5309073003 MUDA NUSA TENGGARA TIMUR 447 Pre-Electrified - - - 123.23519 -8.31707 23241 5309073004 SUKUTOKAN NUSA TENGGARA TIMUR 791 Pre-Electrified - - - 123.23664 -8.30555 23242 5309073005 LAMAPAHA NUSA TENGGARA TIMUR 595 Pre-Electrified - - - 123.22885 -8.31089 23243 5309073006 HINGA NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 123.22499 -8.29893 23244 5309073006 HINGA NUSA TENGGARA TIMUR 335 Pre-Electrified - - - 123.22866 -8.30776 23245 5309073006 HINGA NUSA TENGGARA TIMUR 568 Pre-Electrified - - - 123.23445 -8.30419 23246 5309073007 REDONTENA NUSA TENGGARA TIMUR 1 005 Pre-Electrified - - - 123.23940 -8.29738 23247 5309073010 LAMABUNGA NUSA TENGGARA TIMUR 1 289 Pre-Electrified - - - 123.22277 -8.28927 23248 5309073010 LAMABUNGA NUSA TENGGARA TIMUR 386 Pre-Electrified - - - 123.21961 -8.28699 23249 5309073019 KELUWAIN NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 123.22702 -8.29150 23250 5309073019 KELUWAIN NUSA TENGGARA TIMUR 420 Pre-Electrified - - - 123.22926 -8.29719 23251 5309074001 TIKATUKANG NUSA TENGGARA TIMUR 696 Pre-Electrified - - - 123.19530 -8.29952 23252 5309074002 LAMAHODA NUSA TENGGARA TIMUR 1 008 Pre-Electrified - - - 123.19453 -8.29363 23253 5309074003 KOLILANANG NUSA TENGGARA TIMUR 1 186 Pre-Electrified - - - 123.19697 -8.29210 23254 5309074005 ADONARA NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 123.14683 -8.25014 23255 5309074005 ADONARA NUSA TENGGARA TIMUR 273 Pre-Electrified - - - 123.14684 -8.24953 23256 5309074005 ADONARA NUSA TENGGARA TIMUR 703 Pre-Electrified - - - 123.14126 -8.24076 23257 5309074006 NISA NULAN NUSA TENGGARA TIMUR 116 Pre-Electrified - - - 123.20452 -8.26087 23258 5309074007 KOLI MASANG NUSA TENGGARA TIMUR 1 760 Pre-Electrified - - - 123.19842 -8.28004 23259 5310010001 WOLOWIRO NUSA TENGGARA TIMUR 2 094 Pre-Electrified - - - 122.01306 -8.78117 Annex II – Demand forecast results Page 156 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 23260 5310010001 WOLOWIRO NUSA TENGGARA TIMUR 69 Pre-Electrified - - - 122.00133 -8.79571 23261 5310010003 MBENGU NUSA TENGGARA TIMUR 153 Pre-Electrified - - - 122.04200 -8.78067 23262 5310010003 MBENGU NUSA TENGGARA TIMUR 787 Pre-Electrified - - - 122.02570 -8.77690 23263 5310010003 MBENGU NUSA TENGGARA TIMUR 1 556 Pre-Electrified - - - 122.03458 -8.78271 23264 5310010003 MBENGU NUSA TENGGARA TIMUR 3 OffGrid Systems 1 849 0.2 122.01843 -8.76773 23265 5310010003 MBENGU NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 122.02821 -8.78204 23266 5310010004 PAGA NUSA TENGGARA TIMUR 3 322 Pre-Electrified - - - 122.04575 -8.77573 23267 5310010004 PAGA NUSA TENGGARA TIMUR 133 Pre-Electrified - - - 122.06111 -8.74372 23268 5310010004 PAGA NUSA TENGGARA TIMUR 162 Pre-Electrified - - - 122.06008 -8.73775 23269 5310010004 PAGA NUSA TENGGARA TIMUR 56 Pre-Electrified - - - 122.05915 -8.73232 23270 5310010004 PAGA NUSA TENGGARA TIMUR 23 Pre-Electrified - - - 122.05848 -8.73612 23271 5310010008 LENANDARETA NUSA TENGGARA TIMUR 148 Pre-Electrified - - - 122.05627 -8.71795 23272 5310010008 LENANDARETA NUSA TENGGARA TIMUR 123 Pre-Electrified - - - 122.05931 -8.71881 23273 5310010008 LENANDARETA NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 122.06066 -8.71989 23274 5310010015 MASEBEWA NUSA TENGGARA TIMUR 364 Pre-Electrified - - - 122.02226 -8.72730 23275 5310010015 MASEBEWA NUSA TENGGARA TIMUR 194 Pre-Electrified - - - 122.03887 -8.72174 23276 5310010015 MASEBEWA NUSA TENGGARA TIMUR 170 Pre-Electrified - - - 122.06258 -8.71714 23277 5310010015 MASEBEWA NUSA TENGGARA TIMUR 91 Pre-Electrified - - - 122.05677 -8.71746 23278 5310010015 MASEBEWA NUSA TENGGARA TIMUR 83 Pre-Electrified - - - 122.02965 -8.72511 23279 5310010015 MASEBEWA NUSA TENGGARA TIMUR 146 Pre-Electrified - - - 122.04453 -8.71776 23280 5310010015 MASEBEWA NUSA TENGGARA TIMUR 205 Pre-Electrified - - - 122.02699 -8.72571 23281 5310010015 MASEBEWA NUSA TENGGARA TIMUR 22 Pre-Electrified - - - 122.06084 -8.71920 23282 5310010015 MASEBEWA NUSA TENGGARA TIMUR 134 Pre-Electrified - - - 122.01862 -8.72886 23283 5310010015 MASEBEWA NUSA TENGGARA TIMUR 17 Pre-Electrified - - - 122.04634 -8.71832 23284 5310010016 WOLOREGA NUSA TENGGARA TIMUR - Pre-Electrified - - - 122.00145 -8.66921 23285 5310011001 KOROBHERA NUSA TENGGARA TIMUR 271 Pre-Electrified - - - 122.06464 -8.74499 23286 5310011001 KOROBHERA NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 122.06389 -8.73229 23287 5310011002 DOBO NUSA TENGGARA TIMUR 1 299 Pre-Electrified - - - 122.09201 -8.71124 23288 5310011002 DOBO NUSA TENGGARA TIMUR 53 Pre-Electrified - - - 122.09122 -8.70572 23289 5310011002 DOBO NUSA TENGGARA TIMUR 205 Pre-Electrified - - - 122.11353 -8.70572 23290 5310011002 DOBO NUSA TENGGARA TIMUR 115 Pre-Electrified - - - 122.09093 -8.70724 23291 5310011003 BHERA NUSA TENGGARA TIMUR 1 672 Pre-Electrified - - - 122.07628 -8.71178 23292 5310011003 BHERA NUSA TENGGARA TIMUR 31 Pre-Electrified - - - 122.06301 -8.71659 23293 5310011003 BHERA NUSA TENGGARA TIMUR 272 Pre-Electrified - - - 122.06641 -8.71831 23294 5310011005 GERA NUSA TENGGARA TIMUR 322 Pre-Electrified - - - 122.09107 -8.69925 23295 5310011005 GERA NUSA TENGGARA TIMUR 276 Pre-Electrified - - - 122.08831 -8.69016 23296 5310011006 LIAKUTU NUSA TENGGARA TIMUR 50 MiniGrid Systems 13 11 037 2.4 122.04189 -8.61904 23297 5310011008 DOBO NUA PUU NUSA TENGGARA TIMUR 659 Pre-Electrified - - - 122.10534 -8.70327 23298 5310011008 DOBO NUA PUU NUSA TENGGARA TIMUR 135 Pre-Electrified - - - 122.08858 -8.69033 23299 5310011008 DOBO NUA PUU NUSA TENGGARA TIMUR 73 Pre-Electrified - - - 122.09158 -8.70487 23300 5310012009 BU SELATAN NUSA TENGGARA TIMUR - Pre-Electrified - - - 121.97097 -8.75080 23301 5310020001 KOLIDETUNG NUSA TENGGARA TIMUR 339 Pre-Electrified - - - 122.12387 -8.72606 23302 5310020001 KOLIDETUNG NUSA TENGGARA TIMUR 77 Pre-Electrified - - - 122.12089 -8.72937 23303 5310020001 KOLIDETUNG NUSA TENGGARA TIMUR 379 Pre-Electrified - - - 122.12816 -8.72214 23304 5310020001 KOLIDETUNG NUSA TENGGARA TIMUR 6 Pre-Electrified - - - 122.12505 -8.72532 23305 5310020001 KOLIDETUNG NUSA TENGGARA TIMUR 90 Pre-Electrified - - - 122.13016 -8.72136 23306 5310020001 KOLIDETUNG NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 122.14209 -8.72879 23307 5310020001 KOLIDETUNG NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 122.12656 -8.72642 23308 5310020002 KOROWUWU NUSA TENGGARA TIMUR 103 Pre-Electrified - - - 122.11824 -8.70475 23309 5310020002 KOROWUWU NUSA TENGGARA TIMUR 581 Pre-Electrified - - - 122.13444 -8.71878 23310 5310020002 KOROWUWU NUSA TENGGARA TIMUR 316 Pre-Electrified - - - 122.13735 -8.71101 23311 5310020002 KOROWUWU NUSA TENGGARA TIMUR 108 Pre-Electrified - - - 122.13472 -8.71623 23312 5310020003 HEPANG NUSA TENGGARA TIMUR 366 Pre-Electrified - - - 122.16000 -8.72861 23313 5310020003 HEPANG NUSA TENGGARA TIMUR 928 Pre-Electrified - - - 122.15136 -8.70785 23314 5310020003 HEPANG NUSA TENGGARA TIMUR 249 Pre-Electrified - - - 122.14570 -8.72732 23315 5310020003 HEPANG NUSA TENGGARA TIMUR 162 Pre-Electrified - - - 122.15313 -8.71513 23316 5310020003 HEPANG NUSA TENGGARA TIMUR 109 Pre-Electrified - - - 122.14160 -8.71739 23317 5310020003 HEPANG NUSA TENGGARA TIMUR 64 Pre-Electrified - - - 122.15446 -8.72695 23318 5310020004 LELA NUSA TENGGARA TIMUR 2 006 Pre-Electrified - - - 122.17202 -8.72577 23319 5310020004 LELA NUSA TENGGARA TIMUR 122 Pre-Electrified - - - 122.17327 -8.70868 23320 5310020004 LELA NUSA TENGGARA TIMUR 89 Pre-Electrified - - - 122.17470 -8.72801 23321 5310020004 LELA NUSA TENGGARA TIMUR 105 Pre-Electrified - - - 122.17472 -8.72935 23322 5310020004 LELA NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 122.18066 -8.71762 23323 5310020005 WATUTEDANG NUSA TENGGARA TIMUR 138 Pre-Electrified - - - 122.18275 -8.73323 23324 5310020005 WATUTEDANG NUSA TENGGARA TIMUR 237 Pre-Electrified - - - 122.17670 -8.72993 23325 5310020005 WATUTEDANG NUSA TENGGARA TIMUR 252 Pre-Electrified - - - 122.17985 -8.73011 23326 5310020005 WATUTEDANG NUSA TENGGARA TIMUR 95 Pre-Electrified - - - 122.18805 -8.72223 23327 5310020005 WATUTEDANG NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 122.18119 -8.71752 23328 5310020005 WATUTEDANG NUSA TENGGARA TIMUR 93 Pre-Electrified - - - 122.18108 -8.72718 23329 5310020006 SIKKA NUSA TENGGARA TIMUR 1 059 Pre-Electrified - - - 122.19664 -8.74913 23330 5310020007 ILIGAI NUSA TENGGARA TIMUR 44 Pre-Electrified - - - 122.19940 -8.71369 23331 5310020007 ILIGAI NUSA TENGGARA TIMUR 282 Pre-Electrified - - - 122.20195 -8.71252 23332 5310020007 ILIGAI NUSA TENGGARA TIMUR 198 Pre-Electrified - - - 122.18955 -8.71098 23333 5310020007 ILIGAI NUSA TENGGARA TIMUR 197 Pre-Electrified - - - 122.19178 -8.71544 23334 5310020007 ILIGAI NUSA TENGGARA TIMUR 150 Pre-Electrified - - - 122.19089 -8.72048 23335 5310020007 ILIGAI NUSA TENGGARA TIMUR 273 Pre-Electrified - - - 122.19408 -8.71354 23336 5310020007 ILIGAI NUSA TENGGARA TIMUR 138 Pre-Electrified - - - 122.19524 -8.71444 23337 5310020007 ILIGAI NUSA TENGGARA TIMUR 27 Pre-Electrified - - - 122.20241 -8.70665 23338 5310020007 ILIGAI NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 122.18740 -8.71610 23339 5310020007 ILIGAI NUSA TENGGARA TIMUR 31 Pre-Electrified - - - 122.18708 -8.71558 23340 5310020008 BAOPAAT NUSA TENGGARA TIMUR 293 Pre-Electrified - - - 122.16565 -8.71169 23341 5310020008 BAOPAAT NUSA TENGGARA TIMUR 297 Pre-Electrified - - - 122.16240 -8.70471 23342 5310020009 DU NUSA TENGGARA TIMUR 22 Pre-Electrified - - - 122.19327 -8.74628 23343 5310020009 DU NUSA TENGGARA TIMUR 347 Pre-Electrified - - - 122.18438 -8.73522 23344 5310020009 DU NUSA TENGGARA TIMUR 110 Pre-Electrified - - - 122.19173 -8.73455 Annex II – Demand forecast results Page 157 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 23345 5310020009 DU NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 122.19688 -8.74154 23346 5310030002 WOLONWALU NUSA TENGGARA TIMUR 302 Pre-Electrified - - - 122.27237 -8.73024 23347 5310030002 WOLONWALU NUSA TENGGARA TIMUR 192 Pre-Electrified - - - 122.27997 -8.74385 23348 5310030002 WOLONWALU NUSA TENGGARA TIMUR 164 Pre-Electrified - - - 122.27180 -8.73552 23349 5310030002 WOLONWALU NUSA TENGGARA TIMUR 210 Pre-Electrified - - - 122.27781 -8.74187 23350 5310030002 WOLONWALU NUSA TENGGARA TIMUR 113 Pre-Electrified - - - 122.26878 -8.73687 23351 5310030002 WOLONWALU NUSA TENGGARA TIMUR 86 Pre-Electrified - - - 122.27307 -8.73852 23352 5310030002 WOLONWALU NUSA TENGGARA TIMUR 86 Pre-Electrified - - - 122.27136 -8.73852 23353 5310030003 WOLOKOLI NUSA TENGGARA TIMUR 639 Pre-Electrified - - - 122.28159 -8.73051 23354 5310030003 WOLOKOLI NUSA TENGGARA TIMUR 387 Pre-Electrified - - - 122.28663 -8.72701 23355 5310030003 WOLOKOLI NUSA TENGGARA TIMUR 213 Pre-Electrified - - - 122.28124 -8.72260 23356 5310030003 WOLOKOLI NUSA TENGGARA TIMUR 314 Pre-Electrified - - - 122.28222 -8.71780 23357 5310030003 WOLOKOLI NUSA TENGGARA TIMUR 114 Pre-Electrified - - - 122.27872 -8.72466 23358 5310030003 WOLOKOLI NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 122.27572 -8.71932 23359 5310030004 BOLA NUSA TENGGARA TIMUR 1 222 Pre-Electrified - - - 122.29538 -8.74195 23360 5310030004 BOLA NUSA TENGGARA TIMUR 207 Pre-Electrified - - - 122.29157 -8.72218 23361 5310030004 BOLA NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 122.29024 -8.72891 23362 5310030004 BOLA NUSA TENGGARA TIMUR 143 Pre-Electrified - - - 122.29075 -8.73860 23363 5310030005 UMAUTA NUSA TENGGARA TIMUR 372 Pre-Electrified - - - 122.30522 -8.72682 23364 5310030005 UMAUTA NUSA TENGGARA TIMUR 293 Pre-Electrified - - - 122.30601 -8.71748 23365 5310030005 UMAUTA NUSA TENGGARA TIMUR 335 Pre-Electrified - - - 122.30972 -8.71510 23366 5310030005 UMAUTA NUSA TENGGARA TIMUR 154 Pre-Electrified - - - 122.29985 -8.71641 23367 5310030005 UMAUTA NUSA TENGGARA TIMUR 91 Pre-Electrified - - - 122.30144 -8.72546 23368 5310030005 UMAUTA NUSA TENGGARA TIMUR 77 Pre-Electrified - - - 122.29997 -8.72798 23369 5310030005 UMAUTA NUSA TENGGARA TIMUR 446 Pre-Electrified - - - 122.29780 -8.73030 23370 5310030005 UMAUTA NUSA TENGGARA TIMUR 56 Pre-Electrified - - - 122.29919 -8.72024 23371 5310030006 IPIR NUSA TENGGARA TIMUR 1 345 Pre-Electrified - - - 122.30672 -8.74132 23372 5310031007 WOLOMOTONG NUSA TENGGARA TIMUR 1 040 Pre-Electrified - - - 122.35139 -8.71150 23373 5310031007 WOLOMOTONG NUSA TENGGARA TIMUR 363 Pre-Electrified - - - 122.35126 -8.69862 23374 5310031007 WOLOMOTONG NUSA TENGGARA TIMUR 384 Pre-Electrified - - - 122.34909 -8.70581 23375 5310031007 WOLOMOTONG NUSA TENGGARA TIMUR 317 Pre-Electrified - - - 122.35002 -8.69797 23376 5310031007 WOLOMOTONG NUSA TENGGARA TIMUR 211 Pre-Electrified - - - 122.34417 -8.70030 23377 5310031007 WOLOMOTONG NUSA TENGGARA TIMUR 331 Pre-Electrified - - - 122.35488 -8.71309 23378 5310032014 HEBING NUSA TENGGARA TIMUR 108 MiniGrid Systems 31 26 319 5.7 122.49867 -8.70223 23379 5310040010 NANGAHALE NUSA TENGGARA TIMUR 1 364 Pre-Electrified - - - 122.51661 -8.54101 23380 5310040010 NANGAHALE NUSA TENGGARA TIMUR 1 785 Pre-Electrified - - - 122.50690 -8.55867 23381 5310040010 NANGAHALE NUSA TENGGARA TIMUR 94 Pre-Electrified - - - 122.51287 -8.55451 23382 5310040015 TALIBURA NUSA TENGGARA TIMUR 740 Pre-Electrified - - - 122.51728 -8.53329 23383 5310040015 TALIBURA NUSA TENGGARA TIMUR 739 Pre-Electrified - - - 122.52041 -8.52716 23384 5310040015 TALIBURA NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 122.51651 -8.53705 23385 5310040015 TALIBURA NUSA TENGGARA TIMUR 409 Pre-Electrified - - - 122.52779 -8.52273 23386 5310040015 TALIBURA NUSA TENGGARA TIMUR 178 Pre-Electrified - - - 122.53127 -8.52492 23387 5310040015 TALIBURA NUSA TENGGARA TIMUR 98 Pre-Electrified - - - 122.52554 -8.52443 23388 5310040016 DARAT GUNUNG NUSA TENGGARA TIMUR 667 Pre-Electrified - - - 122.54140 -8.51528 23389 5310040016 DARAT GUNUNG NUSA TENGGARA TIMUR 347 Pre-Electrified - - - 122.53377 -8.51721 23390 5310040016 DARAT GUNUNG NUSA TENGGARA TIMUR 156 Pre-Electrified - - - 122.54256 -8.50720 23391 5310040016 DARAT GUNUNG NUSA TENGGARA TIMUR 164 Pre-Electrified - - - 122.54863 -8.49056 23392 5310040016 DARAT GUNUNG NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 122.54699 -8.49887 23393 5310040018 NEBE NUSA TENGGARA TIMUR 394 Pre-Electrified - - - 122.57629 -8.48076 23394 5310040018 NEBE NUSA TENGGARA TIMUR 465 Pre-Electrified - - - 122.57853 -8.48052 23395 5310040018 NEBE NUSA TENGGARA TIMUR 366 Pre-Electrified - - - 122.58082 -8.48089 23396 5310040022 WAILAMUNG NUSA TENGGARA TIMUR 46 Pre-Electrified - - - 122.57004 -8.47107 23397 5310040023 LEWOMADA NUSA TENGGARA TIMUR 36 MiniGrid Systems 9 7 641 1.6 122.59436 -8.40826 23398 5310040027 BAANG KOOR NUSA TENGGARA TIMUR 397 Pre-Electrified - - - 122.55450 -8.47725 23399 5310040027 BAANG KOOR NUSA TENGGARA TIMUR 479 Pre-Electrified - - - 122.56155 -8.47418 23400 5310040027 BAANG KOOR NUSA TENGGARA TIMUR 200 Pre-Electrified - - - 122.55086 -8.48399 23401 5310040027 BAANG KOOR NUSA TENGGARA TIMUR 3 Pre-Electrified - - - 122.57547 -8.48059 23402 5310040027 BAANG KOOR NUSA TENGGARA TIMUR 254 Pre-Electrified - - - 122.55093 -8.47461 23403 5310040027 BAANG KOOR NUSA TENGGARA TIMUR 75 Pre-Electrified - - - 122.55693 -8.47529 23404 5310040027 BAANG KOOR NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 122.56049 -8.47484 23405 5310040027 BAANG KOOR NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 122.54876 -8.48251 23406 5310040027 BAANG KOOR NUSA TENGGARA TIMUR 38 MiniGrid Systems 9 7 641 1.6 122.55736 -8.45718 23407 5310040027 BAANG KOOR NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 122.54986 -8.48503 23408 5310040027 BAANG KOOR NUSA TENGGARA TIMUR 24 Pre-Electrified - - - 122.54888 -8.48467 23409 5310040027 BAANG KOOR NUSA TENGGARA TIMUR 44 Pre-Electrified - - - 122.55070 -8.48547 23410 5310040027 BAANG KOOR NUSA TENGGARA TIMUR 104 Pre-Electrified - - - 122.56990 -8.47911 23411 5310040027 BAANG KOOR NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 122.55425 -8.48206 23412 5310040027 BAANG KOOR NUSA TENGGARA TIMUR 46 Pre-Electrified - - - 122.54787 -8.48431 23413 5310040027 BAANG KOOR NUSA TENGGARA TIMUR 46 Pre-Electrified - - - 122.54794 -8.48582 23414 5310040027 BAANG KOOR NUSA TENGGARA TIMUR 29 Pre-Electrified - - - 122.55929 -8.47249 23415 5310041001 POGON NUSA TENGGARA TIMUR 1 782 Pre-Electrified - - - 122.32006 -8.66523 23416 5310041001 POGON NUSA TENGGARA TIMUR 766 Pre-Electrified - - - 122.33100 -8.67670 23417 5310041003 WAIRBLELER NUSA TENGGARA TIMUR 406 Pre-Electrified - - - 122.32780 -8.65188 23418 5310041003 WAIRBLELER NUSA TENGGARA TIMUR 15 Pre-Electrified - - - 122.32963 -8.62515 23419 5310041003 WAIRBLELER NUSA TENGGARA TIMUR 577 Pre-Electrified - - - 122.31949 -8.63255 23420 5310041003 WAIRBLELER NUSA TENGGARA TIMUR 836 Pre-Electrified - - - 122.31202 -8.63436 23421 5310041003 WAIRBLELER NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 122.31883 -8.64461 23422 5310041003 WAIRBLELER NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 122.31901 -8.64972 23423 5310041003 WAIRBLELER NUSA TENGGARA TIMUR 651 Pre-Electrified - - - 122.33182 -8.62286 23424 5310041003 WAIRBLELER NUSA TENGGARA TIMUR 142 Pre-Electrified - - - 122.33654 -8.62232 23425 5310041004 HODER NUSA TENGGARA TIMUR 915 Pre-Electrified - - - 122.36953 -8.61430 23426 5310041004 HODER NUSA TENGGARA TIMUR 266 Pre-Electrified - - - 122.35487 -8.61904 23427 5310041004 HODER NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 122.33809 -8.62225 23428 5310041004 HODER NUSA TENGGARA TIMUR 494 Pre-Electrified - - - 122.34185 -8.62239 23429 5310041004 HODER NUSA TENGGARA TIMUR 286 Pre-Electrified - - - 122.37850 -8.61322 Annex II – Demand forecast results Page 158 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 23430 5310041005 EGON NUSA TENGGARA TIMUR 4 100 Pre-Electrified - - - 122.41270 -8.61359 23431 5310041006 NANGATOBONG NUSA TENGGARA TIMUR 1 OffGrid Systems 1 849 0.2 122.44433 -8.62507 23432 5310041006 NANGATOBONG NUSA TENGGARA TIMUR 476 Pre-Electrified - - - 122.43694 -8.61245 23433 5310041006 NANGATOBONG NUSA TENGGARA TIMUR 1 141 Pre-Electrified - - - 122.41990 -8.61581 23434 5310041006 NANGATOBONG NUSA TENGGARA TIMUR 202 Pre-Electrified - - - 122.42765 -8.61285 23435 5310041007 WAIRTERANG NUSA TENGGARA TIMUR 273 Pre-Electrified - - - 122.46965 -8.61027 23436 5310041007 WAIRTERANG NUSA TENGGARA TIMUR 1 651 Pre-Electrified - - - 122.45432 -8.61073 23437 5310041007 WAIRTERANG NUSA TENGGARA TIMUR 23 Pre-Electrified - - - 122.45088 -8.61987 23438 5310041009 RUNUT NUSA TENGGARA TIMUR 206 Pre-Electrified - - - 122.49318 -8.58686 23439 5310041009 RUNUT NUSA TENGGARA TIMUR 317 Pre-Electrified - - - 122.50155 -8.57181 23440 5310050006 IAN TENA NUSA TENGGARA TIMUR 319 Pre-Electrified - - - 122.28793 -8.66299 23441 5310050006 IAN TENA NUSA TENGGARA TIMUR 204 Pre-Electrified - - - 122.28713 -8.65900 23442 5310050007 KOPONG NUSA TENGGARA TIMUR 353 Pre-Electrified - - - 122.29094 -8.64750 23443 5310050007 KOPONG NUSA TENGGARA TIMUR 163 Pre-Electrified - - - 122.29154 -8.65821 23444 5310050007 KOPONG NUSA TENGGARA TIMUR 140 Pre-Electrified - - - 122.29163 -8.66462 23445 5310050007 KOPONG NUSA TENGGARA TIMUR 90 Pre-Electrified - - - 122.28874 -8.64748 23446 5310050007 KOPONG NUSA TENGGARA TIMUR 2 OffGrid Systems 1 849 0.2 122.28784 -8.66783 23447 5310050007 KOPONG NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 122.29093 -8.65414 23448 5310050007 KOPONG NUSA TENGGARA TIMUR 95 Pre-Electrified - - - 122.29180 -8.66191 23449 5310050014 NAMANGKEWA NUSA TENGGARA TIMUR 2 263 Pre-Electrified - - - 122.29931 -8.64059 23450 5310050014 NAMANGKEWA NUSA TENGGARA TIMUR 243 Pre-Electrified - - - 122.29767 -8.65640 23451 5310050014 NAMANGKEWA NUSA TENGGARA TIMUR - Pre-Electrified - - - 122.30292 -8.64862 23452 5310050022 WAIARA NUSA TENGGARA TIMUR 1 356 Pre-Electrified - - - 122.30700 -8.64115 23453 5310050022 WAIARA NUSA TENGGARA TIMUR 484 Pre-Electrified - - - 122.30877 -8.63729 23454 5310050022 WAIARA NUSA TENGGARA TIMUR 228 Pre-Electrified - - - 122.30798 -8.64879 23455 5310050022 WAIARA NUSA TENGGARA TIMUR 318 Pre-Electrified - - - 122.30395 -8.64975 23456 5310050023 GELITING NUSA TENGGARA TIMUR 2 160 Pre-Electrified - - - 122.29166 -8.64444 23457 5310050024 WAIRKOJA NUSA TENGGARA TIMUR 6 Pre-Electrified - - - 122.28765 -8.64171 23458 5310050024 WAIRKOJA NUSA TENGGARA TIMUR 484 Pre-Electrified - - - 122.28526 -8.64098 23459 5310050024 WAIRKOJA NUSA TENGGARA TIMUR 887 Pre-Electrified - - - 122.28223 -8.65292 23460 5310050024 WAIRKOJA NUSA TENGGARA TIMUR 303 Pre-Electrified - - - 122.28502 -8.64734 23461 5310051010 HEOPUAT NUSA TENGGARA TIMUR 8 Pre-Electrified - - - 122.30780 -8.68183 23462 5310051011 WOLOMAPA NUSA TENGGARA TIMUR 748 Pre-Electrified - - - 122.32569 -8.70197 23463 5310051011 WOLOMAPA NUSA TENGGARA TIMUR 257 Pre-Electrified - - - 122.32485 -8.70010 23464 5310051012 RUBIT NUSA TENGGARA TIMUR 1 380 Pre-Electrified - - - 122.34196 -8.69654 23465 5310051012 RUBIT NUSA TENGGARA TIMUR 284 Pre-Electrified - - - 122.34292 -8.69467 23466 5310051013 KAJOWAIR NUSA TENGGARA TIMUR 189 Pre-Electrified - - - 122.30828 -8.68364 23467 5310051013 KAJOWAIR NUSA TENGGARA TIMUR 479 Pre-Electrified - - - 122.32090 -8.69507 23468 5310051013 KAJOWAIR NUSA TENGGARA TIMUR 237 Pre-Electrified - - - 122.31327 -8.70142 23469 5310051013 KAJOWAIR NUSA TENGGARA TIMUR 296 Pre-Electrified - - - 122.31230 -8.69866 23470 5310051013 KAJOWAIR NUSA TENGGARA TIMUR 261 Pre-Electrified - - - 122.31679 -8.68745 23471 5310051020 BAOMEKOT NUSA TENGGARA TIMUR 828 Pre-Electrified - - - 122.34174 -8.69841 23472 5310051020 BAOMEKOT NUSA TENGGARA TIMUR 156 Pre-Electrified - - - 122.33003 -8.70204 23473 5310051020 BAOMEKOT NUSA TENGGARA TIMUR 299 Pre-Electrified - - - 122.33245 -8.70089 23474 5310051021 MUNERANA NUSA TENGGARA TIMUR 1 079 Pre-Electrified - - - 122.30816 -8.68210 23475 5310052001 TEKAIKU NUSA TENGGARA TIMUR 150 Pre-Electrified - - - 122.24687 -8.69812 23476 5310052001 TEKAIKU NUSA TENGGARA TIMUR 213 Pre-Electrified - - - 122.24757 -8.69338 23477 5310052001 TEKAIKU NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 122.24976 -8.67964 23478 5310052001 TEKAIKU NUSA TENGGARA TIMUR 452 Pre-Electrified - - - 122.25196 -8.67339 23479 5310052001 TEKAIKU NUSA TENGGARA TIMUR 9 Pre-Electrified - - - 122.25007 -8.67877 23480 5310052002 MEKENDETUN NUSA TENGGARA TIMUR 287 Pre-Electrified - - - 122.25551 -8.68419 23481 5310052003 BLATATATIN NUSA TENGGARA TIMUR 253 Pre-Electrified - - - 122.27598 -8.70272 23482 5310052003 BLATATATIN NUSA TENGGARA TIMUR 178 Pre-Electrified - - - 122.27947 -8.70490 23483 5310052003 BLATATATIN NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 122.27376 -8.70290 23484 5310052004 KOKOWAHOR NUSA TENGGARA TIMUR 340 Pre-Electrified - - - 122.27205 -8.65800 23485 5310052004 KOKOWAHOR NUSA TENGGARA TIMUR 237 Pre-Electrified - - - 122.26782 -8.66005 23486 5310052004 KOKOWAHOR NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 122.27319 -8.65471 23487 5310052004 KOKOWAHOR NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 122.27039 -8.66131 23488 5310052004 KOKOWAHOR NUSA TENGGARA TIMUR 111 Pre-Electrified - - - 122.26570 -8.66368 23489 5310052015 WATUMILOK NUSA TENGGARA TIMUR 1 023 Pre-Electrified - - - 122.27881 -8.63753 23490 5310052015 WATUMILOK NUSA TENGGARA TIMUR 996 Pre-Electrified - - - 122.27466 -8.64630 23491 5310052015 WATUMILOK NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 122.28416 -8.64068 23492 5310052015 WATUMILOK NUSA TENGGARA TIMUR 74 Pre-Electrified - - - 122.27659 -8.63922 23493 5310052015 WATUMILOK NUSA TENGGARA TIMUR 197 Pre-Electrified - - - 122.28093 -8.63969 23494 5310052016 TANADUEN NUSA TENGGARA TIMUR 333 Pre-Electrified - - - 122.27559 -8.63782 23495 5310052016 TANADUEN NUSA TENGGARA TIMUR - Pre-Electrified - - - 122.27281 -8.65043 23496 5310052016 TANADUEN NUSA TENGGARA TIMUR 334 Pre-Electrified - - - 122.26535 -8.63690 23497 5310052016 TANADUEN NUSA TENGGARA TIMUR 410 Pre-Electrified - - - 122.27092 -8.63749 23498 5310052016 TANADUEN NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 122.27609 -8.63919 23499 5310052016 TANADUEN NUSA TENGGARA TIMUR 980 Pre-Electrified - - - 122.26034 -8.66790 23500 5310052017 WATULIWUNG NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 122.25344 -8.66855 23501 5310052017 WATULIWUNG NUSA TENGGARA TIMUR 408 Pre-Electrified - - - 122.25707 -8.63629 23502 5310052017 WATULIWUNG NUSA TENGGARA TIMUR 372 Pre-Electrified - - - 122.25941 -8.63511 23503 5310052017 WATULIWUNG NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 122.26424 -8.63675 23504 5310052017 WATULIWUNG NUSA TENGGARA TIMUR 1 026 Pre-Electrified - - - 122.25377 -8.65993 23505 5310052017 WATULIWUNG NUSA TENGGARA TIMUR 162 Pre-Electrified - - - 122.25462 -8.66331 23506 5310052018 HABI NUSA TENGGARA TIMUR 1 216 Pre-Electrified - - - 122.24847 -8.65522 23507 5310052018 HABI NUSA TENGGARA TIMUR 209 Pre-Electrified - - - 122.24926 -8.63329 23508 5310052018 HABI NUSA TENGGARA TIMUR 495 Pre-Electrified - - - 122.25263 -8.63416 23509 5310052018 HABI NUSA TENGGARA TIMUR 22 Pre-Electrified - - - 122.25590 -8.63852 23510 5310052018 HABI NUSA TENGGARA TIMUR 11 Pre-Electrified - - - 122.25240 -8.66350 23511 5310052019 LANGIR NUSA TENGGARA TIMUR 1 678 Pre-Electrified - - - 122.24557 -8.65365 23512 5310052019 LANGIR NUSA TENGGARA TIMUR 308 Pre-Electrified - - - 122.23841 -8.65319 23513 5310052019 LANGIR NUSA TENGGARA TIMUR 194 Pre-Electrified - - - 122.24809 -8.63362 23514 5310052019 LANGIR NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 122.24606 -8.64183 Annex II – Demand forecast results Page 159 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 23515 5310052019 LANGIR NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 122.24530 -8.64526 23516 5310062001 KOTING C NUSA TENGGARA TIMUR 1 000 Pre-Electrified - - - 122.19008 -8.69462 23517 5310062002 KOTING D NUSA TENGGARA TIMUR 1 568 Pre-Electrified - - - 122.19808 -8.69449 23518 5310062002 KOTING D NUSA TENGGARA TIMUR 23 Pre-Electrified - - - 122.20257 -8.70640 23519 5310062003 PAUBEKOR NUSA TENGGARA TIMUR 702 Pre-Electrified - - - 122.20306 -8.68706 23520 5310062004 KOTING B NUSA TENGGARA TIMUR 782 Pre-Electrified - - - 122.19099 -8.68712 23521 5310062004 KOTING B NUSA TENGGARA TIMUR 283 Pre-Electrified - - - 122.18488 -8.68628 23522 5310062005 KOTING A NUSA TENGGARA TIMUR 1 088 Pre-Electrified - - - 122.19286 -8.68100 23523 5310062005 KOTING A NUSA TENGGARA TIMUR 388 Pre-Electrified - - - 122.19671 -8.68095 23524 5310062006 RIBANG NUSA TENGGARA TIMUR 443 Pre-Electrified - - - 122.19592 -8.66214 23525 5310062006 RIBANG NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 122.18420 -8.66854 23526 5310062006 RIBANG NUSA TENGGARA TIMUR 236 Pre-Electrified - - - 122.18821 -8.66487 23527 5310062006 RIBANG NUSA TENGGARA TIMUR 85 Pre-Electrified - - - 122.19060 -8.66171 23528 5310063001 NELLE WUTUNG NUSA TENGGARA TIMUR 1 474 Pre-Electrified - - - 122.21635 -8.68206 23529 5310063002 NELLE LORANG NUSA TENGGARA TIMUR 1 293 Pre-Electrified - - - 122.21624 -8.67453 23530 5310063003 MANUBURA NUSA TENGGARA TIMUR 607 Pre-Electrified - - - 122.20955 -8.67674 23531 5310063003 MANUBURA NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 122.20622 -8.66674 23532 5310063003 MANUBURA NUSA TENGGARA TIMUR 255 Pre-Electrified - - - 122.20980 -8.68529 23533 5310063003 MANUBURA NUSA TENGGARA TIMUR 165 Pre-Electrified - - - 122.20864 -8.67036 23534 5310063004 NELLE BARAT NUSA TENGGARA TIMUR 161 Pre-Electrified - - - 122.20725 -8.68974 23535 5310063004 NELLE BARAT NUSA TENGGARA TIMUR 175 Pre-Electrified - - - 122.20486 -8.66537 23536 5310063004 NELLE BARAT NUSA TENGGARA TIMUR 341 Pre-Electrified - - - 122.20797 -8.68569 23537 5310063005 NELLE URUNG NUSA TENGGARA TIMUR 1 296 Pre-Electrified - - - 122.21548 -8.66423 23538 5310070001 TILANG NUSA TENGGARA TIMUR 1 154 Pre-Electrified - - - 122.12316 -8.69887 23539 5310070001 TILANG NUSA TENGGARA TIMUR 516 Pre-Electrified - - - 122.13464 -8.69842 23540 5310070001 TILANG NUSA TENGGARA TIMUR 369 Pre-Electrified - - - 122.14223 -8.70467 23541 5310070001 TILANG NUSA TENGGARA TIMUR 29 Pre-Electrified - - - 122.14090 -8.70300 23542 5310070002 LUSITADA NUSA TENGGARA TIMUR 1 436 Pre-Electrified - - - 122.16198 -8.69393 23543 5310070002 LUSITADA NUSA TENGGARA TIMUR 7 Pre-Electrified - - - 122.15257 -8.70511 23544 5310070002 LUSITADA NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 122.16073 -8.70181 23545 5310070002 LUSITADA NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 122.16068 -8.69969 23546 5310070004 TEBUK NUSA TENGGARA TIMUR 1 602 Pre-Electrified - - - 122.17183 -8.68465 23547 5310070004 TEBUK NUSA TENGGARA TIMUR 85 Pre-Electrified - - - 122.17807 -8.68220 23548 5310070004 TEBUK NUSA TENGGARA TIMUR 168 Pre-Electrified - - - 122.17427 -8.69206 23549 5310070005 NITA NUSA TENGGARA TIMUR 2 645 Pre-Electrified - - - 122.17137 -8.67628 23550 5310070005 NITA NUSA TENGGARA TIMUR 187 Pre-Electrified - - - 122.18654 -8.65805 23551 5310070005 NITA NUSA TENGGARA TIMUR 13 Pre-Electrified - - - 122.19309 -8.66173 23552 5310070005 NITA NUSA TENGGARA TIMUR 137 Pre-Electrified - - - 122.18334 -8.66943 23553 5310070005 NITA NUSA TENGGARA TIMUR 449 Pre-Electrified - - - 122.18600 -8.66549 23554 5310070005 NITA NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 122.18961 -8.66017 23555 5310070006 TAKAPLAGER NUSA TENGGARA TIMUR 484 Pre-Electrified - - - 122.19000 -8.65606 23556 5310070006 TAKAPLAGER NUSA TENGGARA TIMUR 866 Pre-Electrified - - - 122.19382 -8.65346 23557 5310070007 NITAKLOANG NUSA TENGGARA TIMUR 1 216 Pre-Electrified - - - 122.16575 -8.67514 23558 5310070007 NITAKLOANG NUSA TENGGARA TIMUR 256 Pre-Electrified - - - 122.15276 -8.63756 23559 5310070007 NITAKLOANG NUSA TENGGARA TIMUR 305 Pre-Electrified - - - 122.15952 -8.65919 23560 5310070011 NIRANGKLIUNG NUSA TENGGARA TIMUR 812 Pre-Electrified - - - 122.09994 -8.66216 23561 5310070011 NIRANGKLIUNG NUSA TENGGARA TIMUR 375 Pre-Electrified - - - 122.09440 -8.65770 23562 5310070011 NIRANGKLIUNG NUSA TENGGARA TIMUR 355 Pre-Electrified - - - 122.09401 -8.65490 23563 5310070011 NIRANGKLIUNG NUSA TENGGARA TIMUR 294 Pre-Electrified - - - 122.10498 -8.70108 23564 5310071001 KOLISIA NUSA TENGGARA TIMUR 1 319 Pre-Electrified - - - 122.08914 -8.54385 23565 5310071001 KOLISIA NUSA TENGGARA TIMUR 731 Pre-Electrified - - - 122.09639 -8.54207 23566 5310071001 KOLISIA NUSA TENGGARA TIMUR 340 Pre-Electrified - - - 122.08829 -8.54586 23567 5310071001 KOLISIA NUSA TENGGARA TIMUR 252 Pre-Electrified - - - 122.09523 -8.54015 23568 5310071001 KOLISIA NUSA TENGGARA TIMUR 154 Pre-Electrified - - - 122.09254 -8.54074 23569 5310071002 MAGEPANDA NUSA TENGGARA TIMUR 586 Pre-Electrified - - - 122.04759 -8.54105 23570 5310071002 MAGEPANDA NUSA TENGGARA TIMUR 2 211 Pre-Electrified - - - 122.04847 -8.54918 23571 5310071002 MAGEPANDA NUSA TENGGARA TIMUR 152 Pre-Electrified - - - 122.07938 -8.54641 23572 5310071002 MAGEPANDA NUSA TENGGARA TIMUR 179 Pre-Electrified - - - 122.05752 -8.53245 23573 5310071002 MAGEPANDA NUSA TENGGARA TIMUR 52 Pre-Electrified - - - 122.04801 -8.54439 23574 5310071002 MAGEPANDA NUSA TENGGARA TIMUR 82 Pre-Electrified - - - 122.07306 -8.54627 23575 5310071002 MAGEPANDA NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 122.04542 -8.54411 23576 5310071002 MAGEPANDA NUSA TENGGARA TIMUR 2 Pre-Electrified - - - 122.04574 -8.55066 23577 5310071003 REROROJA NUSA TENGGARA TIMUR 1 070 Pre-Electrified - - - 122.03640 -8.52964 23578 5310071003 REROROJA NUSA TENGGARA TIMUR 832 Pre-Electrified - - - 122.00534 -8.52134 23579 5310071003 REROROJA NUSA TENGGARA TIMUR 106 Pre-Electrified - - - 122.03623 -8.53178 23580 5310071003 REROROJA NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 122.00190 -8.52835 23581 5310071004 KOLISIA B NUSA TENGGARA TIMUR 109 Pre-Electrified - - - 122.10178 -8.54746 23582 5310071004 KOLISIA B NUSA TENGGARA TIMUR 82 Pre-Electrified - - - 122.10932 -8.54319 23583 5310071004 KOLISIA B NUSA TENGGARA TIMUR 448 Pre-Electrified - - - 122.10751 -8.54037 23584 5310071004 KOLISIA B NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 122.11136 -8.53920 23585 5310071004 KOLISIA B NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 122.11690 -8.53884 23586 5310071004 KOLISIA B NUSA TENGGARA TIMUR 95 Pre-Electrified - - - 122.13425 -8.54664 23587 5310071004 KOLISIA B NUSA TENGGARA TIMUR 457 Pre-Electrified - - - 122.13060 -8.54951 23588 5310071005 DONE NUSA TENGGARA TIMUR 12 Pre-Electrified - - - 122.04536 -8.54987 23589 5310071005 DONE NUSA TENGGARA TIMUR 504 Pre-Electrified - - - 122.04451 -8.55101 23590 5310080005 KOTA UNENG NUSA TENGGARA TIMUR 12 Pre-Electrified - - - 122.20777 -8.62514 23591 5310080005 KOTA UNENG NUSA TENGGARA TIMUR 365 Pre-Electrified - - - 122.19920 -8.62739 23592 5310080005 KOTA UNENG NUSA TENGGARA TIMUR 9 888 Pre-Electrified - - - 122.21639 -8.61477 23593 5310080005 KOTA UNENG NUSA TENGGARA TIMUR 321 Pre-Electrified - - - 122.20059 -8.61995 23594 5310080005 KOTA UNENG NUSA TENGGARA TIMUR 174 Pre-Electrified - - - 122.21229 -8.60903 23595 5310080005 KOTA UNENG NUSA TENGGARA TIMUR 239 Pre-Electrified - - - 122.20292 -8.61347 23596 5310080005 KOTA UNENG NUSA TENGGARA TIMUR 87 Pre-Electrified - - - 122.20941 -8.60875 23597 5310080005 KOTA UNENG NUSA TENGGARA TIMUR - Pre-Electrified - - - 122.19783 -8.62376 23598 5310080006 NANGALIMANG NUSA TENGGARA TIMUR 859 Pre-Electrified - - - 122.20634 -8.64688 23599 5310080006 NANGALIMANG NUSA TENGGARA TIMUR 1 928 Pre-Electrified - - - 122.20667 -8.64317 Annex II – Demand forecast results Page 160 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 23600 5310080006 NANGALIMANG NUSA TENGGARA TIMUR 277 Pre-Electrified - - - 122.20648 -8.63625 23601 5310080007 MADAWAT NUSA TENGGARA TIMUR 6 264 Pre-Electrified - - - 122.21080 -8.62949 23602 5310080007 MADAWAT NUSA TENGGARA TIMUR 246 Pre-Electrified - - - 122.20631 -8.62826 23603 5310080007 MADAWAT NUSA TENGGARA TIMUR 2 640 Pre-Electrified - - - 122.21092 -8.62313 23604 5310080008 KABOR NUSA TENGGARA TIMUR 1 545 Pre-Electrified - - - 122.21529 -8.62747 23605 5310080008 KABOR NUSA TENGGARA TIMUR 2 259 Pre-Electrified - - - 122.21590 -8.62139 23606 5310080009 PEMANA NUSA TENGGARA TIMUR 1 583 Pre-Electrified - - - 122.31564 -8.35291 23607 5310080009 PEMANA NUSA TENGGARA TIMUR 2 065 Pre-Electrified - - - 122.32109 -8.35059 23608 5310080010 GUNUNG SARI NUSA TENGGARA TIMUR 1 365 Pre-Electrified - - - 122.29727 -8.36357 23609 5310080011 SAMPARONG NUSA TENGGARA TIMUR 894 MiniGrid Systems 234 198 666 42.9 122.10523 -8.12092 23610 5310081001 WURING NUSA TENGGARA TIMUR 2 457 Pre-Electrified - - - 122.14676 -8.55389 23611 5310081001 WURING NUSA TENGGARA TIMUR 1 522 Pre-Electrified - - - 122.15845 -8.56292 23612 5310081001 WURING NUSA TENGGARA TIMUR 998 Pre-Electrified - - - 122.15859 -8.55815 23613 5310081002 HEWULI NUSA TENGGARA TIMUR 1 454 Pre-Electrified - - - 122.16568 -8.56946 23614 5310081002 HEWULI NUSA TENGGARA TIMUR 244 Pre-Electrified - - - 122.17508 -8.58162 23615 5310081003 WAILITI NUSA TENGGARA TIMUR 835 Pre-Electrified - - - 122.18004 -8.58257 23616 5310081003 WAILITI NUSA TENGGARA TIMUR 337 Pre-Electrified - - - 122.18263 -8.58803 23617 5310081003 WAILITI NUSA TENGGARA TIMUR 729 Pre-Electrified - - - 122.18684 -8.60486 23618 5310081003 WAILITI NUSA TENGGARA TIMUR 358 Pre-Electrified - - - 122.19135 -8.59657 23619 5310081003 WAILITI NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 122.18677 -8.59159 23620 5310081003 WAILITI NUSA TENGGARA TIMUR - Pre-Electrified - - - 122.19785 -8.62372 23621 5310081003 WAILITI NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 122.18424 -8.59102 23622 5310081003 WAILITI NUSA TENGGARA TIMUR 79 MiniGrid Systems 19 16 131 3.5 122.17019 -8.61133 23623 5310081004 WOLOMARANG NUSA TENGGARA TIMUR 7 334 Pre-Electrified - - - 122.19946 -8.60398 23624 5310081004 WOLOMARANG NUSA TENGGARA TIMUR 159 Pre-Electrified - - - 122.19594 -8.62308 23625 5310081004 WOLOMARANG NUSA TENGGARA TIMUR 73 Pre-Electrified - - - 122.19754 -8.62360 23626 5310082009 KOTA BARU NUSA TENGGARA TIMUR 2 642 Pre-Electrified - - - 122.21898 -8.63178 23627 5310082009 KOTA BARU NUSA TENGGARA TIMUR 643 Pre-Electrified - - - 122.21711 -8.63889 23628 5310082009 KOTA BARU NUSA TENGGARA TIMUR 56 Pre-Electrified - - - 122.21470 -8.63178 23629 5310082009 KOTA BARU NUSA TENGGARA TIMUR 86 Pre-Electrified - - - 122.21691 -8.64100 23630 5310082009 KOTA BARU NUSA TENGGARA TIMUR 2 377 Pre-Electrified - - - 122.21959 -8.62245 23631 5310082010 BERU NUSA TENGGARA TIMUR 2 282 Pre-Electrified - - - 122.22199 -8.62987 23632 5310082010 BERU NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 122.21938 -8.63838 23633 5310082010 BERU NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 122.21771 -8.64098 23634 5310082010 BERU NUSA TENGGARA TIMUR 751 Pre-Electrified - - - 122.22312 -8.62285 23635 5310082011 NANGAMETING NUSA TENGGARA TIMUR 3 733 Pre-Electrified - - - 122.22794 -8.62841 23636 5310082012 WAIROTANG NUSA TENGGARA TIMUR 839 Pre-Electrified - - - 122.22800 -8.62552 23637 5310082012 WAIROTANG NUSA TENGGARA TIMUR 1 701 Pre-Electrified - - - 122.22651 -8.62370 23638 5310082013 WAIOTI NUSA TENGGARA TIMUR 6 021 Pre-Electrified - - - 122.23762 -8.62994 23639 5310082013 WAIOTI NUSA TENGGARA TIMUR 262 Pre-Electrified - - - 122.23659 -8.63548 23640 5310082014 WATUGONG NUSA TENGGARA TIMUR 1 297 Pre-Electrified - - - 122.22624 -8.66087 23641 5310082014 WATUGONG NUSA TENGGARA TIMUR 865 Pre-Electrified - - - 122.22894 -8.66720 23642 5310082014 WATUGONG NUSA TENGGARA TIMUR 131 Pre-Electrified - - - 122.22638 -8.68958 23643 5310082018 LEPOLIMA NUSA TENGGARA TIMUR 1 275 Pre-Electrified - - - 122.21449 -8.64448 23644 5311010001 ONDOREA NUSA TENGGARA TIMUR 284 Pre-Electrified - - - 121.45948 -8.79006 23645 5311010001 ONDOREA NUSA TENGGARA TIMUR 212 Pre-Electrified - - - 121.45922 -8.79788 23646 5311010002 KEL. NDORUREA NUSA TENGGARA TIMUR 627 Pre-Electrified - - - 121.47147 -8.79237 23647 5311010002 KEL. NDORUREA NUSA TENGGARA TIMUR 240 Pre-Electrified - - - 121.47679 -8.78677 23648 5311010002 KEL. NDORUREA NUSA TENGGARA TIMUR 506 Pre-Electrified - - - 121.46846 -8.79707 23649 5311010004 NGGOREA NUSA TENGGARA TIMUR - Pre-Electrified - - - 121.52222 -8.80576 23650 5311010004 NGGOREA NUSA TENGGARA TIMUR 836 Pre-Electrified - - - 121.51446 -8.80430 23651 5311010004 NGGOREA NUSA TENGGARA TIMUR 462 Pre-Electrified - - - 121.50822 -8.80359 23652 5311010005 RAPORENDU NUSA TENGGARA TIMUR 496 Pre-Electrified - - - 121.53034 -8.80685 23653 5311010005 RAPORENDU NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 121.54840 -8.80295 23654 5311010007 BHERAMARI NUSA TENGGARA TIMUR 237 Pre-Electrified - - - 121.56514 -8.79543 23655 5311010007 BHERAMARI NUSA TENGGARA TIMUR 75 Pre-Electrified - - - 121.56481 -8.79369 23656 5311010007 BHERAMARI NUSA TENGGARA TIMUR 746 Pre-Electrified - - - 121.56784 -8.79450 23657 5311010012 ONDOREA BARAT NUSA TENGGARA TIMUR 623 Pre-Electrified - - - 121.41891 -8.79068 23658 5311010012 ONDOREA BARAT NUSA TENGGARA TIMUR 108 Pre-Electrified - - - 121.41892 -8.78215 23659 5311010012 ONDOREA BARAT NUSA TENGGARA TIMUR 78 MiniGrid Systems 20 16 980 3.7 121.42971 -8.77194 23660 5311010014 NDORUREA I NUSA TENGGARA TIMUR 1 067 Pre-Electrified - - - 121.46673 -8.79292 23661 5311010015 NDETUREA NUSA TENGGARA TIMUR 426 Pre-Electrified - - - 121.48742 -8.78792 23662 5311010015 NDETUREA NUSA TENGGARA TIMUR 278 Pre-Electrified - - - 121.48536 -8.78048 23663 5311010017 PENGGAJAWA NUSA TENGGARA TIMUR 658 Pre-Electrified - - - 121.49412 -8.79921 23664 5311012003 KEBIRANGGA NUSA TENGGARA TIMUR 1 OffGrid Systems 1 849 0.2 121.52403 -8.62501 23665 5311012006 NABE NUSA TENGGARA TIMUR 46 MiniGrid Systems 12 10 188 2.2 121.56464 -8.57606 23666 5311020004 NDETUNDORA I NUSA TENGGARA TIMUR 124 Pre-Electrified - - - 121.63668 -8.80313 23667 5311020006 RABURIA NUSA TENGGARA TIMUR 277 Pre-Electrified - - - 121.66525 -8.76361 23668 5311020007 TOMBERABU I NUSA TENGGARA TIMUR 156 Pre-Electrified - - - 121.67438 -8.76473 23669 5311020007 TOMBERABU I NUSA TENGGARA TIMUR 111 Pre-Electrified - - - 121.67850 -8.76152 23670 5311020007 TOMBERABU I NUSA TENGGARA TIMUR 123 Pre-Electrified - - - 121.67625 -8.76144 23671 5311020008 TOMBERABU II NUSA TENGGARA TIMUR 366 Pre-Electrified - - - 121.69285 -8.75705 23672 5311020008 TOMBERABU II NUSA TENGGARA TIMUR 256 Pre-Electrified - - - 121.69210 -8.76620 23673 5311020009 TINABANI NUSA TENGGARA TIMUR 60 MiniGrid Systems 14 11 886 2.6 121.68862 -8.71480 23674 5311020013 NDETUNDORA II NUSA TENGGARA TIMUR 660 Pre-Electrified - - - 121.63444 -8.79538 23675 5311020013 NDETUNDORA II NUSA TENGGARA TIMUR 129 Pre-Electrified - - - 121.63203 -8.79234 23676 5311020013 NDETUNDORA II NUSA TENGGARA TIMUR 121 Pre-Electrified - - - 121.63068 -8.79314 23677 5311020013 NDETUNDORA II NUSA TENGGARA TIMUR 94 Pre-Electrified - - - 121.63507 -8.79145 23678 5311020013 NDETUNDORA II NUSA TENGGARA TIMUR 172 Pre-Electrified - - - 121.63204 -8.79664 23679 5311020015 RIARAJA NUSA TENGGARA TIMUR 309 Pre-Electrified - - - 121.60335 -8.78703 23680 5311020015 RIARAJA NUSA TENGGARA TIMUR 404 Pre-Electrified - - - 121.59614 -8.79157 23681 5311020015 RIARAJA NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 121.60142 -8.79155 23682 5311020017 RUKURAMBA NUSA TENGGARA TIMUR 686 Pre-Electrified - - - 121.59023 -8.79974 23683 5311020017 RUKURAMBA NUSA TENGGARA TIMUR 406 Pre-Electrified - - - 121.59048 -8.79247 23684 5311020017 RUKURAMBA NUSA TENGGARA TIMUR 156 Pre-Electrified - - - 121.57723 -8.79845 Annex II – Demand forecast results Page 161 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 23685 5311020019 NDETUNDORA III NUSA TENGGARA TIMUR 180 Pre-Electrified - - - 121.63696 -8.79011 23686 5311020019 NDETUNDORA III NUSA TENGGARA TIMUR 765 Pre-Electrified - - - 121.64145 -8.78977 23687 5311030001 KEL. PAUPANDA NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 121.64115 -8.85726 23688 5311030001 KEL. PAUPANDA NUSA TENGGARA TIMUR 2 619 Pre-Electrified - - - 121.64330 -8.85557 23689 5311030001 KEL. PAUPANDA NUSA TENGGARA TIMUR 197 Pre-Electrified - - - 121.64291 -8.85836 23690 5311030002 KEL. RUKUNLIMA NUSA TENGGARA TIMUR 533 Pre-Electrified - - - 121.65380 -8.85486 23691 5311030002 KEL. RUKUNLIMA NUSA TENGGARA TIMUR 4 300 Pre-Electrified - - - 121.64417 -8.85176 23692 5311030002 KEL. RUKUNLIMA NUSA TENGGARA TIMUR 355 Pre-Electrified - - - 121.64818 -8.85573 23693 5311030002 KEL. RUKUNLIMA NUSA TENGGARA TIMUR 272 Pre-Electrified - - - 121.64769 -8.85712 23694 5311030002 KEL. RUKUNLIMA NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 121.65143 -8.85323 23695 5311030003 KEL. MBONGAWANI NUSA TENGGARA TIMUR 2 994 Pre-Electrified - - - 121.64559 -8.84747 23696 5311030004 KEL. TETANDARA NUSA TENGGARA TIMUR 921 Pre-Electrified - - - 121.65949 -8.85466 23697 5311030004 KEL. TETANDARA NUSA TENGGARA TIMUR 5 438 Pre-Electrified - - - 121.65656 -8.85299 23698 5311030004 KEL. TETANDARA NUSA TENGGARA TIMUR 713 Pre-Electrified - - - 121.66102 -8.86681 23699 5311030004 KEL. TETANDARA NUSA TENGGARA TIMUR 193 Pre-Electrified - - - 121.66315 -8.85078 23700 5311030004 KEL. TETANDARA NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 121.66089 -8.85008 23701 5311030005 KEL. TANJUNG NUSA TENGGARA TIMUR 1 669 Pre-Electrified - - - 121.63801 -8.86067 23702 5311030005 KEL. TANJUNG NUSA TENGGARA TIMUR 372 Pre-Electrified - - - 121.63389 -8.86914 23703 5311030005 KEL. TANJUNG NUSA TENGGARA TIMUR 261 Pre-Electrified - - - 121.63538 -8.86513 23704 5311030005 KEL. TANJUNG NUSA TENGGARA TIMUR 117 Pre-Electrified - - - 121.64162 -8.85945 23705 5311030005 KEL. TANJUNG NUSA TENGGARA TIMUR 134 Pre-Electrified - - - 121.63136 -8.87279 23706 5311031001 KEL. MAUTAPAGA NUSA TENGGARA TIMUR 9 581 Pre-Electrified - - - 121.66883 -8.84542 23707 5311031001 KEL. MAUTAPAGA NUSA TENGGARA TIMUR 75 Pre-Electrified - - - 121.66337 -8.84225 23708 5311031002 KEL. REWARANGGA NUSA TENGGARA TIMUR 1 587 Pre-Electrified - - - 121.67419 -8.81550 23709 5311031002 KEL. REWARANGGA NUSA TENGGARA TIMUR 467 Pre-Electrified - - - 121.67008 -8.80563 23710 5311031002 KEL. REWARANGGA NUSA TENGGARA TIMUR 145 Pre-Electrified - - - 121.67032 -8.78690 23711 5311031002 KEL. REWARANGGA NUSA TENGGARA TIMUR 195 Pre-Electrified - - - 121.66830 -8.80876 23712 5311031002 KEL. REWARANGGA NUSA TENGGARA TIMUR 164 Pre-Electrified - - - 121.66988 -8.79934 23713 5311031004 NDUNGGA NUSA TENGGARA TIMUR 629 Pre-Electrified - - - 121.67238 -8.78641 23714 5311031005 TIWUTEWA NUSA TENGGARA TIMUR 239 Pre-Electrified - - - 121.67235 -8.77232 23715 5311031005 TIWUTEWA NUSA TENGGARA TIMUR 296 Pre-Electrified - - - 121.68832 -8.77382 23716 5311031006 KEL. REWARANGGA SELATAN NUSA TENGGARA TIMUR 350 Pre-Electrified - - - 121.67045 -8.83246 23717 5311031006 KEL. REWARANGGA SELATAN NUSA TENGGARA TIMUR 2 264 Pre-Electrified - - - 121.67607 -8.83209 23718 5311031006 KEL. REWARANGGA SELATAN NUSA TENGGARA TIMUR 93 Pre-Electrified - - - 121.67707 -8.83834 23719 5311031006 KEL. REWARANGGA SELATAN NUSA TENGGARA TIMUR 212 Pre-Electrified - - - 121.67593 -8.83608 23720 5311032001 KEL. POTULANDO NUSA TENGGARA TIMUR 3 560 Pre-Electrified - - - 121.64932 -8.84424 23721 5311032002 KEL. ONEKORE NUSA TENGGARA TIMUR 8 104 Pre-Electrified - - - 121.65119 -8.83872 23722 5311032003 KEL. KELIMUTU NUSA TENGGARA TIMUR 5 756 Pre-Electrified - - - 121.65680 -8.84579 23723 5311032004 KEL. PAUPIRE NUSA TENGGARA TIMUR 1 385 Pre-Electrified - - - 121.66746 -8.83373 23724 5311032004 KEL. PAUPIRE NUSA TENGGARA TIMUR 6 157 Pre-Electrified - - - 121.65845 -8.83707 23725 5311032004 KEL. PAUPIRE NUSA TENGGARA TIMUR 348 Pre-Electrified - - - 121.66521 -8.83217 23726 5311033001 KEL. KOTARAJA NUSA TENGGARA TIMUR 3 847 Pre-Electrified - - - 121.64562 -8.84084 23727 5311033002 KEL. KOTARATU NUSA TENGGARA TIMUR 5 697 Pre-Electrified - - - 121.64175 -8.83818 23728 5311033003 KEL. ROWORENA NUSA TENGGARA TIMUR 1 440 Pre-Electrified - - - 121.64353 -8.82061 23729 5311033003 KEL. ROWORENA NUSA TENGGARA TIMUR 453 Pre-Electrified - - - 121.64254 -8.82729 23730 5311033003 KEL. ROWORENA NUSA TENGGARA TIMUR 388 Pre-Electrified - - - 121.64233 -8.81533 23731 5311033003 KEL. ROWORENA NUSA TENGGARA TIMUR 270 Pre-Electrified - - - 121.64210 -8.82534 23732 5311033004 GHEOGHOMA NUSA TENGGARA TIMUR 596 Pre-Electrified - - - 121.61997 -8.82861 23733 5311033004 GHEOGHOMA NUSA TENGGARA TIMUR 148 Pre-Electrified - - - 121.61577 -8.82746 23734 5311033004 GHEOGHOMA NUSA TENGGARA TIMUR 612 Pre-Electrified - - - 121.63348 -8.81163 23735 5311033004 GHEOGHOMA NUSA TENGGARA TIMUR 117 Pre-Electrified - - - 121.63326 -8.81530 23736 5311033005 BOROKANDA NUSA TENGGARA TIMUR 1 085 Pre-Electrified - - - 121.60381 -8.82005 23737 5311033005 BOROKANDA NUSA TENGGARA TIMUR 768 Pre-Electrified - - - 121.59582 -8.81011 23738 5311033005 BOROKANDA NUSA TENGGARA TIMUR 476 Pre-Electrified - - - 121.59232 -8.80299 23739 5311033006 WATUSIPI NUSA TENGGARA TIMUR 500 Pre-Electrified - - - 121.62052 -8.81445 23740 5311033006 WATUSIPI NUSA TENGGARA TIMUR 91 Pre-Electrified - - - 121.62461 -8.81185 23741 5311033006 WATUSIPI NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 121.62524 -8.81125 23742 5311033007 KEL. ROWORENA BARAT NUSA TENGGARA TIMUR 67 Pre-Electrified - - - 121.64014 -8.83296 23743 5311033007 KEL. ROWORENA BARAT NUSA TENGGARA TIMUR 3 Pre-Electrified - - - 121.64143 -8.82793 23744 5311033007 KEL. ROWORENA BARAT NUSA TENGGARA TIMUR 489 Pre-Electrified - - - 121.64040 -8.83096 23745 5311033007 KEL. ROWORENA BARAT NUSA TENGGARA TIMUR 318 Pre-Electrified - - - 121.63819 -8.82134 23746 5311033007 KEL. ROWORENA BARAT NUSA TENGGARA TIMUR 192 Pre-Electrified - - - 121.63237 -8.82505 23747 5311033007 KEL. ROWORENA BARAT NUSA TENGGARA TIMUR 133 Pre-Electrified - - - 121.63610 -8.82423 23748 5311033007 KEL. ROWORENA BARAT NUSA TENGGARA TIMUR 117 Pre-Electrified - - - 121.63792 -8.82322 23749 5311033007 KEL. ROWORENA BARAT NUSA TENGGARA TIMUR 107 Pre-Electrified - - - 121.63800 -8.81641 23750 5311033007 KEL. ROWORENA BARAT NUSA TENGGARA TIMUR 19 Pre-Electrified - - - 121.63354 -8.81540 23751 5311040001 NANGANESA NUSA TENGGARA TIMUR - Pre-Electrified - - - 121.68885 -8.83311 23752 5311040001 NANGANESA NUSA TENGGARA TIMUR 451 Pre-Electrified - - - 121.68673 -8.83389 23753 5311040001 NANGANESA NUSA TENGGARA TIMUR 767 Pre-Electrified - - - 121.68227 -8.83428 23754 5311040001 NANGANESA NUSA TENGGARA TIMUR 255 Pre-Electrified - - - 121.67937 -8.84005 23755 5311040002 KEL. ONELAKO NUSA TENGGARA TIMUR 907 Pre-Electrified - - - 121.69149 -8.83190 23756 5311040002 KEL. ONELAKO NUSA TENGGARA TIMUR 537 Pre-Electrified - - - 121.69798 -8.82777 23757 5311040002 KEL. ONELAKO NUSA TENGGARA TIMUR 89 Pre-Electrified - - - 121.68911 -8.83068 23758 5311040002 KEL. ONELAKO NUSA TENGGARA TIMUR 86 Pre-Electrified - - - 121.69991 -8.82667 23759 5311040003 MANULONDO NUSA TENGGARA TIMUR 25 Pre-Electrified - - - 121.69454 -8.83035 23760 5311040003 MANULONDO NUSA TENGGARA TIMUR 1 191 Pre-Electrified - - - 121.69613 -8.83053 23761 5311040004 WOLOTOPO NUSA TENGGARA TIMUR 1 011 Pre-Electrified - - - 121.71082 -8.85283 23762 5311040005 WOLOTOPO TIMUR NUSA TENGGARA TIMUR 875 Pre-Electrified - - - 121.71070 -8.85465 23763 5311040015 KEL. LOKOBOKO NUSA TENGGARA TIMUR 459 Pre-Electrified - - - 121.68316 -8.82343 23764 5311040015 KEL. LOKOBOKO NUSA TENGGARA TIMUR 156 Pre-Electrified - - - 121.68213 -8.82720 23765 5311040015 KEL. LOKOBOKO NUSA TENGGARA TIMUR 92 Pre-Electrified - - - 121.67301 -8.80182 23766 5311040015 KEL. LOKOBOKO NUSA TENGGARA TIMUR 1 031 Pre-Electrified - - - 121.67999 -8.81942 23767 5311041004 ROGA NUSA TENGGARA TIMUR 23 MiniGrid Systems 8 6 792 1.5 121.80103 -8.81824 23768 5311050005 MBULIWARALAU UTARA NUSA TENGGARA TIMUR 131 Pre-Electrified - - - 121.87453 -8.81591 23769 5311050005 MBULIWARALAU UTARA NUSA TENGGARA TIMUR 134 Pre-Electrified - - - 121.87384 -8.80035 Annex II – Demand forecast results Page 162 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 23770 5311050005 MBULIWARALAU UTARA NUSA TENGGARA TIMUR 258 Pre-Electrified - - - 121.87001 -8.81441 23771 5311050005 MBULIWARALAU UTARA NUSA TENGGARA TIMUR 299 Pre-Electrified - - - 121.87309 -8.81148 23772 5311050005 MBULIWARALAU UTARA NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 121.87444 -8.81377 23773 5311050005 MBULIWARALAU UTARA NUSA TENGGARA TIMUR 205 Pre-Electrified - - - 121.87687 -8.81189 23774 5311050005 MBULIWARALAU UTARA NUSA TENGGARA TIMUR 3 Pre-Electrified - - - 121.87506 -8.81588 23775 5311050005 MBULIWARALAU UTARA NUSA TENGGARA TIMUR 116 Pre-Electrified - - - 121.87706 -8.81493 23776 5311050005 MBULIWARALAU UTARA NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 121.87838 -8.80235 23777 5311050005 MBULIWARALAU UTARA NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 121.87720 -8.80369 23778 5311050006 MBULIWARALAU NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 121.87499 -8.81920 23779 5311050006 MBULIWARALAU NUSA TENGGARA TIMUR 516 Pre-Electrified - - - 121.87718 -8.81731 23780 5311050006 MBULIWARALAU NUSA TENGGARA TIMUR 316 Pre-Electrified - - - 121.88307 -8.82748 23781 5311050006 MBULIWARALAU NUSA TENGGARA TIMUR 224 Pre-Electrified - - - 121.88489 -8.81995 23782 5311050006 MBULIWARALAU NUSA TENGGARA TIMUR 154 Pre-Electrified - - - 121.88327 -8.81811 23783 5311050017 BOKASAPE NUSA TENGGARA TIMUR 2 118 Pre-Electrified - - - 121.88555 -8.78457 23784 5311050017 BOKASAPE NUSA TENGGARA TIMUR 31 Pre-Electrified - - - 121.88754 -8.79011 23785 5311050018 WOLOKOLI NUSA TENGGARA TIMUR 661 Pre-Electrified - - - 121.86237 -8.79361 23786 5311050018 WOLOKOLI NUSA TENGGARA TIMUR 691 Pre-Electrified - - - 121.86538 -8.79360 23787 5311050019 JOPU NUSA TENGGARA TIMUR 1 634 Pre-Electrified - - - 121.86163 -8.79466 23788 5311050019 JOPU NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 121.86708 -8.80034 23789 5311050024 MBULILOO NUSA TENGGARA TIMUR 499 Pre-Electrified - - - 121.86918 -8.78366 23790 5311050024 MBULILOO NUSA TENGGARA TIMUR 304 Pre-Electrified - - - 121.86597 -8.78514 23791 5311050024 MBULILOO NUSA TENGGARA TIMUR 112 Pre-Electrified - - - 121.86763 -8.78061 23792 5311050024 MBULILOO NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 121.86501 -8.78744 23793 5311050024 MBULILOO NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 121.86719 -8.78671 23794 5311050025 RINDIWAWO NUSA TENGGARA TIMUR 509 Pre-Electrified - - - 121.85881 -8.77606 23795 5311050025 RINDIWAWO NUSA TENGGARA TIMUR 187 Pre-Electrified - - - 121.86384 -8.77604 23796 5311050025 RINDIWAWO NUSA TENGGARA TIMUR 185 Pre-Electrified - - - 121.86215 -8.77299 23797 5311050025 RINDIWAWO NUSA TENGGARA TIMUR 144 Pre-Electrified - - - 121.85927 -8.77877 23798 5311050025 RINDIWAWO NUSA TENGGARA TIMUR 132 Pre-Electrified - - - 121.86218 -8.76964 23799 5311050025 RINDIWAWO NUSA TENGGARA TIMUR 32 Pre-Electrified - - - 121.86053 -8.77088 23800 5311050025 RINDIWAWO NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 121.86008 -8.77337 23801 5311050026 LISEDETU NUSA TENGGARA TIMUR 412 Pre-Electrified - - - 121.88620 -8.77863 23802 5311050026 LISEDETU NUSA TENGGARA TIMUR 787 Pre-Electrified - - - 121.89013 -8.77417 23803 5311050026 LISEDETU NUSA TENGGARA TIMUR 103 Pre-Electrified - - - 121.89311 -8.76823 23804 5311050027 NUALISE NUSA TENGGARA TIMUR 32 MiniGrid Systems 9 7 641 1.6 121.87096 -8.76021 23805 5311050027 NUALISE NUSA TENGGARA TIMUR 73 Pre-Electrified - - - 121.86357 -8.75439 23806 5311050027 NUALISE NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 121.86836 -8.76533 23807 5311050027 NUALISE NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 121.86522 -8.75532 23808 5311050037 NAKAMBARA NUSA TENGGARA TIMUR 295 Pre-Electrified - - - 121.88293 -8.79024 23809 5311050037 NAKAMBARA NUSA TENGGARA TIMUR 359 Pre-Electrified - - - 121.87886 -8.78904 23810 5311050037 NAKAMBARA NUSA TENGGARA TIMUR 146 Pre-Electrified - - - 121.88222 -8.79392 23811 5311050037 NAKAMBARA NUSA TENGGARA TIMUR 142 Pre-Electrified - - - 121.87678 -8.78789 23812 5311050037 NAKAMBARA NUSA TENGGARA TIMUR 93 Pre-Electrified - - - 121.87736 -8.78982 23813 5311050037 NAKAMBARA NUSA TENGGARA TIMUR 105 Pre-Electrified - - - 121.88302 -8.79259 23814 5311050037 NAKAMBARA NUSA TENGGARA TIMUR 102 Pre-Electrified - - - 121.88102 -8.79653 23815 5311051001 NUAMULI NUSA TENGGARA TIMUR 178 Pre-Electrified - - - 121.82193 -8.83090 23816 5311051001 NUAMULI NUSA TENGGARA TIMUR 259 Pre-Electrified - - - 121.81659 -8.82774 23817 5311051001 NUAMULI NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 121.81423 -8.82428 23818 5311051001 NUAMULI NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 121.82674 -8.83490 23819 5311051001 NUAMULI NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 121.81674 -8.83221 23820 5311051001 NUAMULI NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 121.82540 -8.83528 23821 5311051002 NGGELA NUSA TENGGARA TIMUR 1 056 Pre-Electrified - - - 121.84653 -8.84173 23822 5311051003 PORA NUSA TENGGARA TIMUR 343 Pre-Electrified - - - 121.82846 -8.82622 23823 5311051003 PORA NUSA TENGGARA TIMUR 668 Pre-Electrified - - - 121.83667 -8.83086 23824 5311051003 PORA NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 121.83109 -8.82937 23825 5311051004 KEL. WOLOJITA NUSA TENGGARA TIMUR 965 Pre-Electrified - - - 121.84913 -8.81573 23826 5311051004 KEL. WOLOJITA NUSA TENGGARA TIMUR 158 Pre-Electrified - - - 121.83677 -8.82131 23827 5311051004 KEL. WOLOJITA NUSA TENGGARA TIMUR 84 Pre-Electrified - - - 121.83994 -8.81471 23828 5311051004 KEL. WOLOJITA NUSA TENGGARA TIMUR 58 Pre-Electrified - - - 121.84057 -8.81340 23829 5311051004 KEL. WOLOJITA NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 121.83865 -8.80758 23830 5311051004 KEL. WOLOJITA NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 121.84417 -8.81745 23831 5311051004 KEL. WOLOJITA NUSA TENGGARA TIMUR 25 Pre-Electrified - - - 121.84009 -8.80843 23832 5311051004 KEL. WOLOJITA NUSA TENGGARA TIMUR 15 Pre-Electrified - - - 121.84122 -8.81206 23833 5311051005 TENDA NUSA TENGGARA TIMUR 428 Pre-Electrified - - - 121.84314 -8.80260 23834 5311051005 TENDA NUSA TENGGARA TIMUR 453 Pre-Electrified - - - 121.84833 -8.80289 23835 5311051006 WIWIPEMO NUSA TENGGARA TIMUR 509 Pre-Electrified - - - 121.82336 -8.81461 23836 5311051006 WIWIPEMO NUSA TENGGARA TIMUR 137 Pre-Electrified - - - 121.82176 -8.81218 23837 5311051006 WIWIPEMO NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 121.82586 -8.81399 23838 5311051006 WIWIPEMO NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 121.82431 -8.81783 23839 5311051006 WIWIPEMO NUSA TENGGARA TIMUR 32 Pre-Electrified - - - 121.82172 -8.81926 23840 5311051006 WIWIPEMO NUSA TENGGARA TIMUR 16 Pre-Electrified - - - 121.81990 -8.81176 23841 5311052001 HOBATUWA NUSA TENGGARA TIMUR 193 Pre-Electrified - - - 121.97770 -8.80029 23842 5311052001 HOBATUWA NUSA TENGGARA TIMUR 156 Pre-Electrified - - - 121.97970 -8.80615 23843 5311052002 KEL. WATUNESO NUSA TENGGARA TIMUR 602 Pre-Electrified - - - 121.97231 -8.78199 23844 5311052002 KEL. WATUNESO NUSA TENGGARA TIMUR 370 Pre-Electrified - - - 121.97398 -8.78716 23845 5311052002 KEL. WATUNESO NUSA TENGGARA TIMUR 64 Pre-Electrified - - - 121.97786 -8.79921 23846 5311052002 KEL. WATUNESO NUSA TENGGARA TIMUR 105 Pre-Electrified - - - 121.97659 -8.79552 23847 5311052002 KEL. WATUNESO NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 121.97610 -8.79385 23848 5311052002 KEL. WATUNESO NUSA TENGGARA TIMUR 61 Pre-Electrified - - - 121.97318 -8.78452 23849 5311052002 KEL. WATUNESO NUSA TENGGARA TIMUR 71 Pre-Electrified - - - 121.96599 -8.78100 23850 5311052002 KEL. WATUNESO NUSA TENGGARA TIMUR 122 Pre-Electrified - - - 121.98734 -8.80405 23851 5311052002 KEL. WATUNESO NUSA TENGGARA TIMUR 58 Pre-Electrified - - - 121.96722 -8.78413 23852 5311052002 KEL. WATUNESO NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 121.99004 -8.80279 23853 5311052002 KEL. WATUNESO NUSA TENGGARA TIMUR 52 Pre-Electrified - - - 121.98104 -8.79991 23854 5311052002 KEL. WATUNESO NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 121.99293 -8.80602 Annex II – Demand forecast results Page 163 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 23855 5311052002 KEL. WATUNESO NUSA TENGGARA TIMUR 22 Pre-Electrified - - - 121.98091 -8.79566 23856 5311052007 WOLOARO NUSA TENGGARA TIMUR 451 Pre-Electrified - - - 121.97319 -8.77097 23857 5311052007 WOLOARO NUSA TENGGARA TIMUR 162 Pre-Electrified - - - 121.97528 -8.77217 23858 5311052007 WOLOARO NUSA TENGGARA TIMUR 47 Pre-Electrified - - - 121.97998 -8.77885 23859 5311053002 WOLOARA NUSA TENGGARA TIMUR 415 Pre-Electrified - - - 121.85594 -8.75663 23860 5311053002 WOLOARA NUSA TENGGARA TIMUR 151 Pre-Electrified - - - 121.85797 -8.76239 23861 5311053002 WOLOARA NUSA TENGGARA TIMUR 109 Pre-Electrified - - - 121.85165 -8.76069 23862 5311053002 WOLOARA NUSA TENGGARA TIMUR 56 Pre-Electrified - - - 121.85497 -8.76174 23863 5311053002 WOLOARA NUSA TENGGARA TIMUR 31 Pre-Electrified - - - 121.84661 -8.75244 23864 5311053003 KOANARA NUSA TENGGARA TIMUR 200 Pre-Electrified - - - 121.84865 -8.75040 23865 5311053003 KOANARA NUSA TENGGARA TIMUR 58 Pre-Electrified - - - 121.84978 -8.75123 23866 5311053003 KOANARA NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 121.86315 -8.75411 23867 5311053003 KOANARA NUSA TENGGARA TIMUR 543 Pre-Electrified - - - 121.85158 -8.74860 23868 5311053003 KOANARA NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 121.84920 -8.74974 23869 5311053003 KOANARA NUSA TENGGARA TIMUR 161 Pre-Electrified - - - 121.84521 -8.74174 23870 5311053003 KOANARA NUSA TENGGARA TIMUR 312 Pre-Electrified - - - 121.83725 -8.74921 23871 5311053003 KOANARA NUSA TENGGARA TIMUR 134 Pre-Electrified - - - 121.85250 -8.73784 23872 5311053003 KOANARA NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 121.84615 -8.74708 23873 5311053003 KOANARA NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 121.85876 -8.74562 23874 5311053003 KOANARA NUSA TENGGARA TIMUR 64 Pre-Electrified - - - 121.84110 -8.74722 23875 5311053004 NUAMURI NUSA TENGGARA TIMUR 420 Pre-Electrified - - - 121.84340 -8.72872 23876 5311053004 NUAMURI NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 121.84158 -8.73450 23877 5311053004 NUAMURI NUSA TENGGARA TIMUR 194 Pre-Electrified - - - 121.83664 -8.71823 23878 5311053004 NUAMURI NUSA TENGGARA TIMUR 201 Pre-Electrified - - - 121.84386 -8.73500 23879 5311053004 NUAMURI NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 121.84137 -8.72286 23880 5311053004 NUAMURI NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 121.84405 -8.73684 23881 5311053005 NUAMURI BARAT NUSA TENGGARA TIMUR 465 Pre-Electrified - - - 121.84031 -8.73557 23882 5311053005 NUAMURI BARAT NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 121.83994 -8.73913 23883 5311053005 NUAMURI BARAT NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 121.83946 -8.73394 23884 5311053006 NDUARIA NUSA TENGGARA TIMUR 904 Pre-Electrified - - - 121.82711 -8.71280 23885 5311053006 NDUARIA NUSA TENGGARA TIMUR 355 Pre-Electrified - - - 121.82479 -8.71062 23886 5311053006 NDUARIA NUSA TENGGARA TIMUR 131 Pre-Electrified - - - 121.83628 -8.71772 23887 5311054001 SERANDORI NUSA TENGGARA TIMUR 722 Pre-Electrified - - - 121.92653 -8.82476 23888 5311054001 SERANDORI NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 121.92884 -8.82560 23889 5311054001 SERANDORI NUSA TENGGARA TIMUR 124 Pre-Electrified - - - 121.92692 -8.82887 23890 5311054002 MAUBASA NUSA TENGGARA TIMUR 387 Pre-Electrified - - - 121.92968 -8.82689 23891 5311054002 MAUBASA NUSA TENGGARA TIMUR 121 Pre-Electrified - - - 121.93704 -8.82407 23892 5311054002 MAUBASA NUSA TENGGARA TIMUR 719 Pre-Electrified - - - 121.93819 -8.82573 23893 5311054003 MAUBASA TIMUR NUSA TENGGARA TIMUR 288 Pre-Electrified - - - 121.94394 -8.81439 23894 5311054003 MAUBASA TIMUR NUSA TENGGARA TIMUR 254 Pre-Electrified - - - 121.94561 -8.82176 23895 5311060016 RANOKOLO SELATAN NUSA TENGGARA TIMUR 478 Pre-Electrified - - - 121.71719 -8.56475 23896 5311060016 RANOKOLO SELATAN NUSA TENGGARA TIMUR 84 Pre-Electrified - - - 121.71995 -8.56812 23897 5311060017 RANOKOLO NUSA TENGGARA TIMUR 822 Pre-Electrified - - - 121.70172 -8.54517 23898 5311060018 KELIWUMBU NUSA TENGGARA TIMUR 424 Pre-Electrified - - - 121.70956 -8.50538 23899 5311060018 KELIWUMBU NUSA TENGGARA TIMUR 90 Pre-Electrified - - - 121.70644 -8.50561 23900 5311060018 KELIWUMBU NUSA TENGGARA TIMUR 84 Pre-Electrified - - - 121.69894 -8.52406 23901 5311060018 KELIWUMBU NUSA TENGGARA TIMUR 251 Pre-Electrified - - - 121.70680 -8.50703 23902 5311060019 MAUSAMBI NUSA TENGGARA TIMUR 443 Pre-Electrified - - - 121.79295 -8.51383 23903 5311060019 MAUSAMBI NUSA TENGGARA TIMUR 158 Pre-Electrified - - - 121.79354 -8.51699 23904 5311060019 MAUSAMBI NUSA TENGGARA TIMUR 227 Pre-Electrified - - - 121.78820 -8.50984 23905 5311060019 MAUSAMBI NUSA TENGGARA TIMUR 262 Pre-Electrified - - - 121.78715 -8.51841 23906 5311060019 MAUSAMBI NUSA TENGGARA TIMUR 67 MiniGrid Systems 14 11 886 2.6 121.77384 -8.50392 23907 5311060019 MAUSAMBI NUSA TENGGARA TIMUR 46 MiniGrid Systems 10 8 490 1.8 121.77344 -8.50286 23908 5311060020 MAUROLE NUSA TENGGARA TIMUR 1 403 Pre-Electrified - - - 121.80082 -8.51128 23909 5311060020 MAUROLE NUSA TENGGARA TIMUR 10 Pre-Electrified - - - 121.80663 -8.51087 23910 5311060020 MAUROLE NUSA TENGGARA TIMUR 214 Pre-Electrified - - - 121.80186 -8.51670 23911 5311060021 WATUKAMBA NUSA TENGGARA TIMUR 824 Pre-Electrified - - - 121.81282 -8.50723 23912 5311060022 AEWORA NUSA TENGGARA TIMUR 91 MiniGrid Systems 22 18 678 4.0 121.83325 -8.49947 23913 5311061006 TOU TIMUR NUSA TENGGARA TIMUR 8 Pre-Electrified - - - 121.99386 -8.50648 23914 5311061006 TOU TIMUR NUSA TENGGARA TIMUR 203 Pre-Electrified - - - 121.98960 -8.53449 23915 5311061006 TOU TIMUR NUSA TENGGARA TIMUR 262 Pre-Electrified - - - 121.99434 -8.52172 23916 5311061006 TOU TIMUR NUSA TENGGARA TIMUR 154 Pre-Electrified - - - 121.99401 -8.51942 23917 5311061006 TOU TIMUR NUSA TENGGARA TIMUR 82 Pre-Electrified - - - 121.99517 -8.51647 23918 5311061006 TOU TIMUR NUSA TENGGARA TIMUR 125 Pre-Electrified - - - 121.99142 -8.52709 23919 5311061006 TOU TIMUR NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 121.99269 -8.52671 23920 5311061006 TOU TIMUR NUSA TENGGARA TIMUR 232 Pre-Electrified - - - 122.00194 -8.51214 23921 5311061007 TOU NUSA TENGGARA TIMUR 672 Pre-Electrified - - - 121.97150 -8.52612 23922 5311061007 TOU NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 121.96922 -8.52714 23923 5311061007 TOU NUSA TENGGARA TIMUR 360 Pre-Electrified - - - 121.95626 -8.53359 23924 5311061009 LOBONIKI NUSA TENGGARA TIMUR 498 Pre-Electrified - - - 121.92435 -8.50949 23925 5311061009 LOBONIKI NUSA TENGGARA TIMUR 349 Pre-Electrified - - - 121.92641 -8.51256 23926 5311061009 LOBONIKI NUSA TENGGARA TIMUR 141 Pre-Electrified - - - 121.91711 -8.50709 23927 5311061009 LOBONIKI NUSA TENGGARA TIMUR 236 Pre-Electrified - - - 121.93010 -8.51983 23928 5311061010 NDONDO NUSA TENGGARA TIMUR 90 Pre-Electrified - - - 121.93990 -8.53257 23929 5311061011 KOTABARU NUSA TENGGARA TIMUR 587 Pre-Electrified - - - 121.99203 -8.50889 23930 5311061011 KOTABARU NUSA TENGGARA TIMUR 369 Pre-Electrified - - - 121.98841 -8.51341 23931 5311061011 KOTABARU NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 121.98760 -8.50888 23932 5311061011 KOTABARU NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 121.99382 -8.51304 23933 5311061011 KOTABARU NUSA TENGGARA TIMUR 73 MiniGrid Systems 16 13 584 2.9 121.97284 -8.48947 23934 5311062001 WOLOMUKU NUSA TENGGARA TIMUR 85 MiniGrid Systems 19 16 131 3.5 121.75229 -8.59670 23935 5311062011 UNGGU NUSA TENGGARA TIMUR 65 MiniGrid Systems 14 11 886 2.6 121.84423 -8.60607 23936 5311063001 WOLOGAI TIMUR NUSA TENGGARA TIMUR 270 Pre-Electrified - - - 121.81545 -8.70238 23937 5311063001 WOLOGAI TIMUR NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 121.81681 -8.70020 23938 5311063001 WOLOGAI TIMUR NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 121.82028 -8.70437 23939 5311063003 MUKUREKU NUSA TENGGARA TIMUR 1 OffGrid Systems 1 849 0.2 121.87505 -8.63004 Annex II – Demand forecast results Page 164 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 23940 5311070019 NUAONE NUSA TENGGARA TIMUR 144 Pre-Electrified - - - 121.78779 -8.69486 23941 5311070019 NUAONE NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 121.77776 -8.69925 23942 5311070020 RANGA NUSA TENGGARA TIMUR 223 Pre-Electrified - - - 121.74208 -8.69382 23943 5311070020 RANGA NUSA TENGGARA TIMUR 165 Pre-Electrified - - - 121.74091 -8.68852 23944 5311070020 RANGA NUSA TENGGARA TIMUR 153 Pre-Electrified - - - 121.73093 -8.68076 23945 5311070020 RANGA NUSA TENGGARA TIMUR 136 Pre-Electrified - - - 121.73374 -8.67995 23946 5311070020 RANGA NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 121.74190 -8.69082 23947 5311070020 RANGA NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 121.74257 -8.70160 23948 5311070020 RANGA NUSA TENGGARA TIMUR 19 Pre-Electrified - - - 121.73820 -8.69184 23949 5311070021 WOLOMAGE NUSA TENGGARA TIMUR 440 Pre-Electrified - - - 121.73543 -8.70280 23950 5311070024 DILE NUSA TENGGARA TIMUR 135 Pre-Electrified - - - 121.73209 -8.74084 23951 5311070024 DILE NUSA TENGGARA TIMUR 114 Pre-Electrified - - - 121.72717 -8.74828 23952 5311070024 DILE NUSA TENGGARA TIMUR 225 Pre-Electrified - - - 121.73029 -8.74610 23953 5311070024 DILE NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 121.73398 -8.74279 23954 5311070025 ROA NUSA TENGGARA TIMUR 262 Pre-Electrified - - - 121.71832 -8.75668 23955 5311070025 ROA NUSA TENGGARA TIMUR 127 Pre-Electrified - - - 121.72366 -8.76314 23956 5311070025 ROA NUSA TENGGARA TIMUR 138 Pre-Electrified - - - 121.71869 -8.77122 23957 5311070026 WOLOTOLO NUSA TENGGARA TIMUR 318 Pre-Electrified - - - 121.71383 -8.75959 23958 5311070026 WOLOTOLO NUSA TENGGARA TIMUR 79 Pre-Electrified - - - 121.70739 -8.76287 23959 5311070026 WOLOTOLO NUSA TENGGARA TIMUR 98 Pre-Electrified - - - 121.71143 -8.76429 23960 5311070026 WOLOTOLO NUSA TENGGARA TIMUR 89 Pre-Electrified - - - 121.70882 -8.76020 23961 5311070026 WOLOTOLO NUSA TENGGARA TIMUR 133 Pre-Electrified - - - 121.70567 -8.76227 23962 5311070027 WOLOTOLO TENGAH NUSA TENGGARA TIMUR 444 Pre-Electrified - - - 121.71077 -8.76752 23963 5311070027 WOLOTOLO TENGAH NUSA TENGGARA TIMUR 2 Pre-Electrified - - - 121.71778 -8.77094 23964 5311070027 WOLOTOLO TENGAH NUSA TENGGARA TIMUR 96 Pre-Electrified - - - 121.70475 -8.76738 23965 5311070027 WOLOTOLO TENGAH NUSA TENGGARA TIMUR 51 Pre-Electrified - - - 121.71371 -8.76890 23966 5311070029 WOLOMASI NUSA TENGGARA TIMUR 278 Pre-Electrified - - - 121.72833 -8.76516 23967 5311070029 WOLOMASI NUSA TENGGARA TIMUR 178 Pre-Electrified - - - 121.72615 -8.76812 23968 5311070030 SAGA NUSA TENGGARA TIMUR 665 Pre-Electrified - - - 121.73323 -8.76884 23969 5311070031 NDITO NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 121.73386 -8.75848 23970 5311070031 NDITO NUSA TENGGARA TIMUR 660 Pre-Electrified - - - 121.73965 -8.75321 23971 5311070031 NDITO NUSA TENGGARA TIMUR - Pre-Electrified - - - 121.72727 -8.74881 23972 5311070032 NIOWULA NUSA TENGGARA TIMUR 465 Pre-Electrified - - - 121.74400 -8.74342 23973 5311070033 WOLOFEO NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 121.74553 -8.72771 23974 5311070033 WOLOFEO NUSA TENGGARA TIMUR 9 Pre-Electrified - - - 121.74986 -8.73584 23975 5311070033 WOLOFEO NUSA TENGGARA TIMUR 132 Pre-Electrified - - - 121.74899 -8.72221 23976 5311070033 WOLOFEO NUSA TENGGARA TIMUR 105 Pre-Electrified - - - 121.74670 -8.72999 23977 5311070033 WOLOFEO NUSA TENGGARA TIMUR 73 Pre-Electrified - - - 121.74178 -8.73485 23978 5311070033 WOLOFEO NUSA TENGGARA TIMUR 29 Pre-Electrified - - - 121.74520 -8.72961 23979 5311070033 WOLOFEO NUSA TENGGARA TIMUR 128 Pre-Electrified - - - 121.75140 -8.73560 23980 5311070033 WOLOFEO NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 121.75099 -8.73837 23981 5311070034 SIPIJENA NUSA TENGGARA TIMUR 524 Pre-Electrified - - - 121.74514 -8.72488 23982 5311070035 DETUSOKO BARAT NUSA TENGGARA TIMUR 694 Pre-Electrified - - - 121.75772 -8.71945 23983 5311070035 DETUSOKO BARAT NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 121.75398 -8.71976 23984 5311070035 DETUSOKO BARAT NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 121.75144 -8.72030 23985 5311070036 KEL. DETUSOKO NUSA TENGGARA TIMUR 907 Pre-Electrified - - - 121.76086 -8.71711 23986 5311070036 KEL. DETUSOKO NUSA TENGGARA TIMUR 140 Pre-Electrified - - - 121.76342 -8.71387 23987 5311070036 KEL. DETUSOKO NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 121.76317 -8.71539 23988 5311070037 WOLOGAI NUSA TENGGARA TIMUR 564 Pre-Electrified - - - 121.78458 -8.69997 23989 5311070037 WOLOGAI NUSA TENGGARA TIMUR 51 Pre-Electrified - - - 121.77689 -8.70331 23990 5311070037 WOLOGAI NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 121.78966 -8.69979 23991 5311070038 WOLOGAI TENGAH NUSA TENGGARA TIMUR 126 Pre-Electrified - - - 121.80847 -8.70738 23992 5311070038 WOLOGAI TENGAH NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 121.81493 -8.69668 23993 5311070038 WOLOGAI TENGAH NUSA TENGGARA TIMUR 17 Pre-Electrified - - - 121.81579 -8.70035 23994 5311070038 WOLOGAI TENGAH NUSA TENGGARA TIMUR 99 Pre-Electrified - - - 121.80826 -8.70977 23995 5311070038 WOLOGAI TENGAH NUSA TENGGARA TIMUR 51 Pre-Electrified - - - 121.79245 -8.70023 23996 5311070038 WOLOGAI TENGAH NUSA TENGGARA TIMUR 318 Pre-Electrified - - - 121.81058 -8.69390 23997 5311071002 MAUTENDA BARAT NUSA TENGGARA TIMUR 3 OffGrid Systems 1 849 0.2 121.68499 -8.65729 23998 5311071004 MUKUSAKI NUSA TENGGARA TIMUR 46 MiniGrid Systems 13 11 037 2.4 121.60429 -8.55844 23999 5311071005 AEMURI NUSA TENGGARA TIMUR 16 OffGrid Systems 4 3 396 0.7 121.66575 -8.50027 24000 5311071005 AEMURI NUSA TENGGARA TIMUR 45 MiniGrid Systems 10 8 490 1.8 121.66552 -8.49933 24001 5311071006 EKOAE NUSA TENGGARA TIMUR 57 MiniGrid Systems 14 11 886 2.6 121.65855 -8.59123 24002 5311071007 WEWARIA NUSA TENGGARA TIMUR 290 Pre-Electrified - - - 121.68944 -8.53175 24003 5311071007 WEWARIA NUSA TENGGARA TIMUR 110 Pre-Electrified - - - 121.70776 -8.56100 24004 5311071007 WEWARIA NUSA TENGGARA TIMUR 157 Pre-Electrified - - - 121.70098 -8.55855 24005 5311071007 WEWARIA NUSA TENGGARA TIMUR 13 OffGrid Systems 4 3 396 0.7 121.69239 -8.55159 24006 5311071008 MAUTENDA NUSA TENGGARA TIMUR 176 Pre-Electrified - - - 121.70203 -8.59280 24007 5311071008 MAUTENDA NUSA TENGGARA TIMUR 94 Pre-Electrified - - - 121.71311 -8.57228 24008 5311071008 MAUTENDA NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 121.71007 -8.60278 24009 5311071008 MAUTENDA NUSA TENGGARA TIMUR 1 222 Pre-Electrified - - - 121.69892 -8.60069 24010 5311071008 MAUTENDA NUSA TENGGARA TIMUR 170 Pre-Electrified - - - 121.69862 -8.60583 24011 5311071009 FATAATU NUSA TENGGARA TIMUR 1 122 Pre-Electrified - - - 121.72937 -8.60068 24012 5311071009 FATAATU NUSA TENGGARA TIMUR 309 Pre-Electrified - - - 121.71767 -8.59287 24013 5311071009 FATAATU NUSA TENGGARA TIMUR 204 Pre-Electrified - - - 121.72624 -8.59285 24014 5311071009 FATAATU NUSA TENGGARA TIMUR 106 Pre-Electrified - - - 121.72351 -8.59453 24015 5311071009 FATAATU NUSA TENGGARA TIMUR 106 Pre-Electrified - - - 121.72462 -8.57783 24016 5311071009 FATAATU NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 121.72674 -8.59570 24017 5311071009 FATAATU NUSA TENGGARA TIMUR 10 OffGrid Systems 3 2 547 0.5 121.72937 -8.57708 24018 5311071011 NUANGENDA NUSA TENGGARA TIMUR 202 Pre-Electrified - - - 121.72660 -8.61237 24019 5311071011 NUANGENDA NUSA TENGGARA TIMUR 172 Pre-Electrified - - - 121.72070 -8.61828 24020 5311071011 NUANGENDA NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 121.71570 -8.61788 24021 5311071011 NUANGENDA NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 121.71845 -8.61627 24022 5311071011 NUANGENDA NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 121.72023 -8.61406 24023 5311071012 WELAMOSA NUSA TENGGARA TIMUR 378 Pre-Electrified - - - 121.72892 -8.60951 24024 5311071012 WELAMOSA NUSA TENGGARA TIMUR 395 Pre-Electrified - - - 121.72664 -8.60529 Annex II – Demand forecast results Page 165 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 24025 5311071012 WELAMOSA NUSA TENGGARA TIMUR 73 Pre-Electrified - - - 121.71990 -8.60635 24026 5311071012 WELAMOSA NUSA TENGGARA TIMUR 99 Pre-Electrified - - - 121.72023 -8.60122 24027 5311071012 WELAMOSA NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 121.71565 -8.60964 24028 5311071012 WELAMOSA NUSA TENGGARA TIMUR 17 Pre-Electrified - - - 121.72038 -8.60285 24029 5311071012 WELAMOSA NUSA TENGGARA TIMUR 77 Pre-Electrified - - - 121.72047 -8.60481 24030 5312010008 KELITEI NUSA TENGGARA TIMUR 242 Pre-Electrified - - - 120.93710 -8.93084 24031 5312010008 KELITEI NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 120.93669 -8.93252 24032 5312010008 KELITEI NUSA TENGGARA TIMUR 129 Pre-Electrified - - - 120.93969 -8.93473 24033 5312010008 KELITEI NUSA TENGGARA TIMUR 31 Pre-Electrified - - - 120.93750 -8.93337 24034 5312010009 WARUPELE I NUSA TENGGARA TIMUR 907 Pre-Electrified - - - 120.92609 -8.92574 24035 5312010009 WARUPELE I NUSA TENGGARA TIMUR 353 Pre-Electrified - - - 120.93156 -8.92191 24036 5312010010 WARUPELE II NUSA TENGGARA TIMUR 357 Pre-Electrified - - - 120.91963 -8.92209 24037 5312010010 WARUPELE II NUSA TENGGARA TIMUR 198 Pre-Electrified - - - 120.92455 -8.91861 24038 5312010010 WARUPELE II NUSA TENGGARA TIMUR 161 Pre-Electrified - - - 120.92221 -8.92035 24039 5312010011 INERIE NUSA TENGGARA TIMUR 622 Pre-Electrified - - - 120.91296 -8.91749 24040 5312010011 INERIE NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 120.90675 -8.91319 24041 5312010011 INERIE NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 120.90847 -8.91434 24042 5312010012 SEBOWULI NUSA TENGGARA TIMUR 775 Pre-Electrified - - - 120.90529 -8.90913 24043 5312010013 PAUPAGA NUSA TENGGARA TIMUR 556 Pre-Electrified - - - 120.89041 -8.89551 24044 5312010013 PAUPAGA NUSA TENGGARA TIMUR 113 Pre-Electrified - - - 120.89851 -8.90290 24045 5312010013 PAUPAGA NUSA TENGGARA TIMUR 79 Pre-Electrified - - - 120.89399 -8.89769 24046 5312010014 FOA NUSA TENGGARA TIMUR 25 Pre-Electrified - - - 120.87958 -8.87517 24047 5312010014 FOA NUSA TENGGARA TIMUR 361 Pre-Electrified - - - 120.87571 -8.88342 24048 5312010014 FOA NUSA TENGGARA TIMUR - Pre-Electrified - - - 120.87501 -8.87849 24049 5312010014 FOA NUSA TENGGARA TIMUR 230 Pre-Electrified - - - 120.87708 -8.87785 24050 5312010014 FOA NUSA TENGGARA TIMUR 368 Pre-Electrified - - - 120.87003 -8.86951 24051 5312010014 FOA NUSA TENGGARA TIMUR 194 Pre-Electrified - - - 120.86821 -8.86534 24052 5312010014 FOA NUSA TENGGARA TIMUR 126 Pre-Electrified - - - 120.86606 -8.86186 24053 5312010014 FOA NUSA TENGGARA TIMUR 441 Pre-Electrified - - - 120.87975 -8.87413 24054 5312010014 FOA NUSA TENGGARA TIMUR - Pre-Electrified - - - 120.87498 -8.88382 24055 5312010014 FOA NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 120.87441 -8.87787 24056 5312010015 AIMERE TIMUR NUSA TENGGARA TIMUR 1 261 Pre-Electrified - - - 120.85870 -8.84666 24057 5312010015 AIMERE TIMUR NUSA TENGGARA TIMUR 372 Pre-Electrified - - - 120.86443 -8.85284 24058 5312010016 AIMERE NUSA TENGGARA TIMUR 2 106 Pre-Electrified - - - 120.85840 -8.84255 24059 5312010016 AIMERE NUSA TENGGARA TIMUR 162 Pre-Electrified - - - 120.85522 -8.83708 24060 5312010016 AIMERE NUSA TENGGARA TIMUR 259 Pre-Electrified - - - 120.84866 -8.83198 24061 5312010016 AIMERE NUSA TENGGARA TIMUR 74 Pre-Electrified - - - 120.81983 -8.83108 24062 5312010016 AIMERE NUSA TENGGARA TIMUR 109 Pre-Electrified - - - 120.81732 -8.83288 24063 5312010016 AIMERE NUSA TENGGARA TIMUR 67 Pre-Electrified - - - 120.84133 -8.82810 24064 5312010016 AIMERE NUSA TENGGARA TIMUR 31 Pre-Electrified - - - 120.85154 -8.83577 24065 5312010016 AIMERE NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 120.85396 -8.83832 24066 5312010017 KELIGEJO NUSA TENGGARA TIMUR 415 Pre-Electrified - - - 120.83054 -8.82178 24067 5312010018 HEAWEA NUSA TENGGARA TIMUR 1 OffGrid Systems 1 849 0.2 120.88145 -8.75005 24068 5312011001 DARIWALI NUSA TENGGARA TIMUR 203 Pre-Electrified - - - 120.99682 -8.89724 24069 5312011001 DARIWALI NUSA TENGGARA TIMUR 258 Pre-Electrified - - - 121.00566 -8.88377 24070 5312011001 DARIWALI NUSA TENGGARA TIMUR 92 Pre-Electrified - - - 121.00372 -8.89282 24071 5312011001 DARIWALI NUSA TENGGARA TIMUR 47 Pre-Electrified - - - 121.00582 -8.88811 24072 5312011001 DARIWALI NUSA TENGGARA TIMUR 51 MiniGrid Systems 13 11 037 2.4 121.02543 -8.87960 24073 5312011001 DARIWALI NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 121.00809 -8.88608 24074 5312011001 DARIWALI NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 121.01221 -8.88102 24075 5312011003 TIWORIWU NUSA TENGGARA TIMUR 596 Pre-Electrified - - - 120.99742 -8.87738 24076 5312011003 TIWORIWU NUSA TENGGARA TIMUR - Pre-Electrified - - - 121.00455 -8.88345 24077 5312011004 WATUMANU NUSA TENGGARA TIMUR 729 Pre-Electrified - - - 120.99119 -8.89658 24078 5312011004 WATUMANU NUSA TENGGARA TIMUR 92 Pre-Electrified - - - 120.98300 -8.89421 24079 5312020001 BAJAWA NUSA TENGGARA TIMUR 643 Pre-Electrified - - - 120.97511 -8.79509 24080 5312020001 BAJAWA NUSA TENGGARA TIMUR 1 023 Pre-Electrified - - - 120.97177 -8.79627 24081 5312020001 BAJAWA NUSA TENGGARA TIMUR 524 Pre-Electrified - - - 120.96993 -8.80494 24082 5312020001 BAJAWA NUSA TENGGARA TIMUR 327 Pre-Electrified - - - 120.96547 -8.79026 24083 5312020001 BAJAWA NUSA TENGGARA TIMUR 2 Pre-Electrified - - - 120.96150 -8.78489 24084 5312020001 BAJAWA NUSA TENGGARA TIMUR 91 Pre-Electrified - - - 120.96721 -8.80554 24085 5312020001 BAJAWA NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 120.97819 -8.80709 24086 5312020001 BAJAWA NUSA TENGGARA TIMUR 53 Pre-Electrified - - - 120.97371 -8.79959 24087 5312020001 BAJAWA NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 120.96977 -8.79522 24088 5312020002 FAOBATA NUSA TENGGARA TIMUR 165 Pre-Electrified - - - 120.98845 -8.77329 24089 5312020002 FAOBATA NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 120.99535 -8.78092 24090 5312020002 FAOBATA NUSA TENGGARA TIMUR 83 Pre-Electrified - - - 120.99496 -8.78236 24091 5312020002 FAOBATA NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 120.98767 -8.78433 24092 5312020002 FAOBATA NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 120.99023 -8.77244 24093 5312020002 FAOBATA NUSA TENGGARA TIMUR 111 Pre-Electrified - - - 120.98442 -8.78692 24094 5312020002 FAOBATA NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 120.98627 -8.78552 24095 5312020002 FAOBATA NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 120.99105 -8.77393 24096 5312020002 FAOBATA NUSA TENGGARA TIMUR 584 Pre-Electrified - - - 120.99034 -8.78335 24097 5312020002 FAOBATA NUSA TENGGARA TIMUR 128 Pre-Electrified - - - 120.99521 -8.76991 24098 5312020002 FAOBATA NUSA TENGGARA TIMUR 368 Pre-Electrified - - - 121.03079 -8.76339 24099 5312020002 FAOBATA NUSA TENGGARA TIMUR 115 Pre-Electrified - - - 121.01754 -8.77160 24100 5312020002 FAOBATA NUSA TENGGARA TIMUR 153 Pre-Electrified - - - 121.02790 -8.75733 24101 5312020002 FAOBATA NUSA TENGGARA TIMUR 66 MiniGrid Systems 13 11 037 2.4 121.02186 -8.75552 24102 5312020002 FAOBATA NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 121.02886 -8.75993 24103 5312020003 TANALODU NUSA TENGGARA TIMUR 2 573 Pre-Electrified - - - 120.97438 -8.79089 24104 5312020003 TANALODU NUSA TENGGARA TIMUR - Pre-Electrified - - - 120.98346 -8.78773 24105 5312020003 TANALODU NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 120.98094 -8.78881 24106 5312020004 KISANATA NUSA TENGGARA TIMUR 1 066 Pre-Electrified - - - 120.97070 -8.78859 24107 5312020005 JAWAMEZE NUSA TENGGARA TIMUR 186 Pre-Electrified - - - 120.96744 -8.78722 24108 5312020005 JAWAMEZE NUSA TENGGARA TIMUR 1 043 Pre-Electrified - - - 120.96361 -8.78440 24109 5312020006 TRIKORA NUSA TENGGARA TIMUR 2 499 Pre-Electrified - - - 120.97165 -8.78597 Annex II – Demand forecast results Page 166 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 24110 5312020006 TRIKORA NUSA TENGGARA TIMUR 29 Pre-Electrified - - - 120.97136 -8.77658 24111 5312020007 NGEDUKELU NUSA TENGGARA TIMUR 2 255 Pre-Electrified - - - 120.97515 -8.78641 24112 5312020007 NGEDUKELU NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 120.98313 -8.78745 24113 5312020007 NGEDUKELU NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 120.98341 -8.78606 24114 5312020007 NGEDUKELU NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 120.98239 -8.78635 24115 5312020007 NGEDUKELU NUSA TENGGARA TIMUR 17 Pre-Electrified - - - 120.98224 -8.78706 24116 5312020008 LEBIJAGA NUSA TENGGARA TIMUR 3 194 Pre-Electrified - - - 120.97371 -8.78136 24117 5312020008 LEBIJAGA NUSA TENGGARA TIMUR 81 Pre-Electrified - - - 120.98129 -8.77591 24118 5312020008 LEBIJAGA NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 120.98149 -8.77875 24119 5312020009 SUSU NUSA TENGGARA TIMUR 58 Pre-Electrified - - - 120.96480 -8.78001 24120 5312020009 SUSU NUSA TENGGARA TIMUR 549 Pre-Electrified - - - 120.95730 -8.76156 24121 5312020009 SUSU NUSA TENGGARA TIMUR 584 Pre-Electrified - - - 120.96180 -8.77690 24122 5312020009 SUSU NUSA TENGGARA TIMUR 217 Pre-Electrified - - - 120.96091 -8.77365 24123 5312020009 SUSU NUSA TENGGARA TIMUR 122 Pre-Electrified - - - 120.96498 -8.77831 24124 5312020009 SUSU NUSA TENGGARA TIMUR 51 Pre-Electrified - - - 120.95959 -8.76106 24125 5312020009 SUSU NUSA TENGGARA TIMUR 117 Pre-Electrified - - - 120.96482 -8.77668 24126 5312020009 SUSU NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 120.95776 -8.76311 24127 5312020009 SUSU NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 120.96627 -8.77773 24128 5312020010 BEJA NUSA TENGGARA TIMUR 950 Pre-Electrified - - - 120.95935 -8.83544 24129 5312020010 BEJA NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 120.96118 -8.83899 24130 5312020011 BOMARI NUSA TENGGARA TIMUR 1 411 Pre-Electrified - - - 120.96367 -8.82588 24131 5312020012 UBEDOLUMOLO NUSA TENGGARA TIMUR 1 069 Pre-Electrified - - - 120.99194 -8.80892 24132 5312020012 UBEDOLUMOLO NUSA TENGGARA TIMUR 349 Pre-Electrified - - - 120.98772 -8.80973 24133 5312020012 UBEDOLUMOLO NUSA TENGGARA TIMUR 51 Pre-Electrified - - - 120.98727 -8.79770 24134 5312020012 UBEDOLUMOLO NUSA TENGGARA TIMUR 298 Pre-Electrified - - - 121.00054 -8.78890 24135 5312020013 BEIWALI NUSA TENGGARA TIMUR 573 Pre-Electrified - - - 120.95322 -8.77910 24136 5312020013 BEIWALI NUSA TENGGARA TIMUR 400 Pre-Electrified - - - 120.95121 -8.77072 24137 5312020013 BEIWALI NUSA TENGGARA TIMUR 120 Pre-Electrified - - - 120.95121 -8.78012 24138 5312020013 BEIWALI NUSA TENGGARA TIMUR 201 Pre-Electrified - - - 120.94979 -8.77574 24139 5312020013 BEIWALI NUSA TENGGARA TIMUR 64 Pre-Electrified - - - 120.95231 -8.77288 24140 5312020013 BEIWALI NUSA TENGGARA TIMUR 56 Pre-Electrified - - - 120.95325 -8.77392 24141 5312020014 WAWOWAE NUSA TENGGARA TIMUR 723 Pre-Electrified - - - 120.94990 -8.78622 24142 5312020014 WAWOWAE NUSA TENGGARA TIMUR 71 Pre-Electrified - - - 120.95510 -8.77852 24143 5312020014 WAWOWAE NUSA TENGGARA TIMUR 498 Pre-Electrified - - - 120.95513 -8.77665 24144 5312020014 WAWOWAE NUSA TENGGARA TIMUR 550 Pre-Electrified - - - 120.95988 -8.78375 24145 5312020014 WAWOWAE NUSA TENGGARA TIMUR 175 Pre-Electrified - - - 120.95454 -8.78272 24146 5312020014 WAWOWAE NUSA TENGGARA TIMUR 76 Pre-Electrified - - - 120.95266 -8.78442 24147 5312020014 WAWOWAE NUSA TENGGARA TIMUR 76 Pre-Electrified - - - 120.95306 -8.78238 24148 5312020014 WAWOWAE NUSA TENGGARA TIMUR 55 Pre-Electrified - - - 120.95158 -8.78470 24149 5312020015 NARU NUSA TENGGARA TIMUR 1 390 Pre-Electrified - - - 120.98446 -8.76452 24150 5312020015 NARU NUSA TENGGARA TIMUR 309 Pre-Electrified - - - 120.98705 -8.76654 24151 5312020015 NARU NUSA TENGGARA TIMUR 93 Pre-Electrified - - - 120.98691 -8.76937 24152 5312020015 NARU NUSA TENGGARA TIMUR 112 Pre-Electrified - - - 120.98194 -8.77413 24153 5312020016 BORANI NUSA TENGGARA TIMUR 755 Pre-Electrified - - - 120.96423 -8.82395 24154 5312020016 BORANI NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 120.96692 -8.81845 24155 5312020016 BORANI NUSA TENGGARA TIMUR 31 Pre-Electrified - - - 120.96847 -8.81649 24156 5312020017 LANGAGEDHA NUSA TENGGARA TIMUR 709 Pre-Electrified - - - 120.95578 -8.82531 24157 5312020017 LANGAGEDHA NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 120.95959 -8.82690 24158 5312020017 LANGAGEDHA NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 120.95391 -8.82713 24159 5312030002 BOBA NUSA TENGGARA TIMUR 123 MiniGrid Systems 30 25 470 5.5 121.08164 -8.92709 24160 5312030004 KEZEWEA NUSA TENGGARA TIMUR 136 Pre-Electrified - - - 121.11100 -8.87938 24161 5312030004 KEZEWEA NUSA TENGGARA TIMUR 162 Pre-Electrified - - - 121.11512 -8.87639 24162 5312030004 KEZEWEA NUSA TENGGARA TIMUR 76 Pre-Electrified - - - 121.11408 -8.87977 24163 5312030004 KEZEWEA NUSA TENGGARA TIMUR 335 Pre-Electrified - - - 121.13664 -8.89866 24164 5312030004 KEZEWEA NUSA TENGGARA TIMUR 47 Pre-Electrified - - - 121.13758 -8.89646 24165 5312030004 KEZEWEA NUSA TENGGARA TIMUR 315 Pre-Electrified - - - 121.11538 -8.86976 24166 5312030004 KEZEWEA NUSA TENGGARA TIMUR 103 Pre-Electrified - - - 121.11478 -8.87213 24167 5312030004 KEZEWEA NUSA TENGGARA TIMUR 58 Pre-Electrified - - - 121.11265 -8.87175 24168 5312030005 SADHA NUSA TENGGARA TIMUR 160 Pre-Electrified - - - 121.09764 -8.85538 24169 5312030005 SADHA NUSA TENGGARA TIMUR 454 Pre-Electrified - - - 121.10280 -8.85431 24170 5312030005 SADHA NUSA TENGGARA TIMUR 81 Pre-Electrified - - - 121.10564 -8.85498 24171 5312030005 SADHA NUSA TENGGARA TIMUR 69 Pre-Electrified - - - 121.11118 -8.86225 24172 5312030006 TAKATUNGA NUSA TENGGARA TIMUR 318 Pre-Electrified - - - 121.11750 -8.86317 24173 5312030007 SARASEDU NUSA TENGGARA TIMUR 849 Pre-Electrified - - - 121.10824 -8.79886 24174 5312030007 SARASEDU NUSA TENGGARA TIMUR 298 Pre-Electrified - - - 121.10711 -8.81058 24175 5312030007 SARASEDU NUSA TENGGARA TIMUR 101 Pre-Electrified - - - 121.11728 -8.79157 24176 5312030007 SARASEDU NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 121.11528 -8.79255 24177 5312030007 SARASEDU NUSA TENGGARA TIMUR 178 Pre-Electrified - - - 121.10366 -8.80439 24178 5312030008 MALANUZA NUSA TENGGARA TIMUR 606 Pre-Electrified - - - 121.08960 -8.81528 24179 5312030008 MALANUZA NUSA TENGGARA TIMUR 454 Pre-Electrified - - - 121.07980 -8.81482 24180 5312030008 MALANUZA NUSA TENGGARA TIMUR 396 Pre-Electrified - - - 121.07781 -8.82243 24181 5312030008 MALANUZA NUSA TENGGARA TIMUR 233 Pre-Electrified - - - 121.07980 -8.82428 24182 5312030008 MALANUZA NUSA TENGGARA TIMUR 117 Pre-Electrified - - - 121.08788 -8.83924 24183 5312030008 MALANUZA NUSA TENGGARA TIMUR 64 Pre-Electrified - - - 121.08775 -8.81932 24184 5312030008 MALANUZA NUSA TENGGARA TIMUR 652 Pre-Electrified - - - 121.07641 -8.81567 24185 5312030008 MALANUZA NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 121.08474 -8.81536 24186 5312030009 TODABELU NUSA TENGGARA TIMUR 1 025 Pre-Electrified - - - 121.06366 -8.82006 24187 5312030009 TODABELU NUSA TENGGARA TIMUR 619 Pre-Electrified - - - 121.05819 -8.83053 24188 5312030009 TODABELU NUSA TENGGARA TIMUR 76 Pre-Electrified - - - 121.06822 -8.81934 24189 5312030009 TODABELU NUSA TENGGARA TIMUR 47 Pre-Electrified - - - 121.05706 -8.82849 24190 5312030009 TODABELU NUSA TENGGARA TIMUR 34 Pre-Electrified - - - 121.07157 -8.81630 24191 5312030009 TODABELU NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 121.06312 -8.82288 24192 5312030010 RATOGESA NUSA TENGGARA TIMUR - Pre-Electrified - - - 121.04859 -8.84613 24193 5312030010 RATOGESA NUSA TENGGARA TIMUR - Pre-Electrified - - - 121.05667 -8.82956 24194 5312030010 RATOGESA NUSA TENGGARA TIMUR 332 Pre-Electrified - - - 121.07973 -8.83870 Annex II – Demand forecast results Page 167 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 24195 5312030010 RATOGESA NUSA TENGGARA TIMUR 1 383 Pre-Electrified - - - 121.05219 -8.83149 24196 5312030010 RATOGESA NUSA TENGGARA TIMUR - Pre-Electrified - - - 121.05101 -8.84141 24197 5312030010 RATOGESA NUSA TENGGARA TIMUR 258 Pre-Electrified - - - 121.09400 -8.85161 24198 5312030010 RATOGESA NUSA TENGGARA TIMUR 73 Pre-Electrified - - - 121.06025 -8.83991 24199 5312030011 DADAWEA NUSA TENGGARA TIMUR 783 Pre-Electrified - - - 121.05138 -8.84651 24200 5312030011 DADAWEA NUSA TENGGARA TIMUR - Pre-Electrified - - - 121.05344 -8.84868 24201 5312030011 DADAWEA NUSA TENGGARA TIMUR 193 Pre-Electrified - - - 121.05130 -8.84305 24202 5312030012 WERE I NUSA TENGGARA TIMUR 915 Pre-Electrified - - - 121.06550 -8.86521 24203 5312030012 WERE I NUSA TENGGARA TIMUR 2 015 Pre-Electrified - - - 121.06059 -8.87243 24204 5312030012 WERE I NUSA TENGGARA TIMUR - Pre-Electrified - - - 121.08349 -8.87057 24205 5312030012 WERE I NUSA TENGGARA TIMUR 229 Pre-Electrified - - - 121.05595 -8.87069 24206 5312030013 RADABATA NUSA TENGGARA TIMUR 1 241 Pre-Electrified - - - 121.05505 -8.85095 24207 5312030014 RAKATEDA I NUSA TENGGARA TIMUR 1 084 Pre-Electrified - - - 121.01298 -8.85732 24208 5312030014 RAKATEDA I NUSA TENGGARA TIMUR 221 Pre-Electrified - - - 121.00376 -8.86766 24209 5312030014 RAKATEDA I NUSA TENGGARA TIMUR 132 Pre-Electrified - - - 121.00230 -8.86262 24210 5312030014 RAKATEDA I NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 121.02101 -8.85426 24211 5312030014 RAKATEDA I NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 121.00658 -8.86206 24212 5312030014 RAKATEDA I NUSA TENGGARA TIMUR 276 Pre-Electrified - - - 121.02334 -8.85918 24213 5312030014 RAKATEDA I NUSA TENGGARA TIMUR 199 Pre-Electrified - - - 121.01766 -8.85338 24214 5312030014 RAKATEDA I NUSA TENGGARA TIMUR 31 Pre-Electrified - - - 121.01236 -8.85334 24215 5312030015 RAKATEDA II NUSA TENGGARA TIMUR 1 465 Pre-Electrified - - - 121.01116 -8.84407 24216 5312030016 MANGULEWA NUSA TENGGARA TIMUR 1 181 Pre-Electrified - - - 121.01931 -8.81724 24217 5312030016 MANGULEWA NUSA TENGGARA TIMUR 860 Pre-Electrified - - - 121.00674 -8.81113 24218 5312030016 MANGULEWA NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 121.01625 -8.82299 24219 5312030016 MANGULEWA NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 121.01545 -8.81989 24220 5312030017 RAKALABA NUSA TENGGARA TIMUR 1 603 Pre-Electrified - - - 121.01974 -8.82184 24221 5312030017 RAKALABA NUSA TENGGARA TIMUR 61 Pre-Electrified - - - 121.01890 -8.82654 24222 5312030018 SOBO NUSA TENGGARA TIMUR 1 118 Pre-Electrified - - - 121.02257 -8.82392 24223 5312030018 SOBO NUSA TENGGARA TIMUR 410 Pre-Electrified - - - 121.03147 -8.82171 24224 5312030018 SOBO NUSA TENGGARA TIMUR 77 Pre-Electrified - - - 121.02714 -8.82295 24225 5312030019 MATALOKO NUSA TENGGARA TIMUR 454 Pre-Electrified - - - 121.05837 -8.82613 24226 5312030019 MATALOKO NUSA TENGGARA TIMUR 957 Pre-Electrified - - - 121.05249 -8.82810 24227 5312030019 MATALOKO NUSA TENGGARA TIMUR 1 335 Pre-Electrified - - - 121.05280 -8.82299 24228 5312030019 MATALOKO NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 121.05654 -8.82062 24229 5312030019 MATALOKO NUSA TENGGARA TIMUR 396 Pre-Electrified - - - 121.04785 -8.82795 24230 5312030020 SANGADETO NUSA TENGGARA TIMUR 11 OffGrid Systems 3 2 547 0.5 121.07466 -8.77338 24231 5312030020 SANGADETO NUSA TENGGARA TIMUR 9 OffGrid Systems 2 1 698 0.4 121.08982 -8.73779 24232 5312070008 INELIKA NUSA TENGGARA TIMUR 353 Pre-Electrified - - - 120.99412 -8.74015 24233 5312070008 INELIKA NUSA TENGGARA TIMUR 178 Pre-Electrified - - - 120.99906 -8.73636 24234 5312070008 INELIKA NUSA TENGGARA TIMUR 84 Pre-Electrified - - - 120.99727 -8.73819 24235 5312070008 INELIKA NUSA TENGGARA TIMUR 87 Pre-Electrified - - - 120.99915 -8.74123 24236 5312070008 INELIKA NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 120.99120 -8.74911 24237 5312070008 INELIKA NUSA TENGGARA TIMUR 411 Pre-Electrified - - - 121.00331 -8.73763 24238 5312070008 INELIKA NUSA TENGGARA TIMUR 323 Pre-Electrified - - - 121.00809 -8.73823 24239 5312070008 INELIKA NUSA TENGGARA TIMUR 29 Pre-Electrified - - - 121.00031 -8.73625 24240 5312070017 WOLOLIKA NUSA TENGGARA TIMUR 388 Pre-Electrified - - - 121.01477 -8.72315 24241 5312070017 WOLOLIKA NUSA TENGGARA TIMUR 198 Pre-Electrified - - - 121.01322 -8.72858 24242 5312070017 WOLOLIKA NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 121.01291 -8.72340 24243 5312070020 NABELENA NUSA TENGGARA TIMUR - Pre-Electrified - - - 121.00370 -8.69045 24244 5312071001 TARAWAJA NUSA TENGGARA TIMUR 812 Pre-Electrified - - - 121.04008 -8.72465 24245 5312071001 TARAWAJA NUSA TENGGARA TIMUR 1 206 Pre-Electrified - - - 121.04380 -8.72029 24246 5312071001 TARAWAJA NUSA TENGGARA TIMUR 77 Pre-Electrified - - - 121.04723 -8.72673 24247 5312071002 LOA NUSA TENGGARA TIMUR 1 272 Pre-Electrified - - - 121.04699 -8.72190 24248 5312071003 MENGERUDA NUSA TENGGARA TIMUR 1 166 Pre-Electrified - - - 121.08275 -8.71629 24249 5312071004 PIGA NUSA TENGGARA TIMUR 1 058 Pre-Electrified - - - 121.04722 -8.71395 24250 5312071004 PIGA NUSA TENGGARA TIMUR 353 Pre-Electrified - - - 121.04616 -8.71054 24251 5312071004 PIGA NUSA TENGGARA TIMUR 309 Pre-Electrified - - - 121.04864 -8.71051 24252 5312071004 PIGA NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 121.05912 -8.70960 24253 5312071005 MASUMELI NUSA TENGGARA TIMUR 543 Pre-Electrified - - - 121.04426 -8.70891 24254 5312071005 MASUMELI NUSA TENGGARA TIMUR 1 795 Pre-Electrified - - - 121.03920 -8.71186 24255 5312071005 MASUMELI NUSA TENGGARA TIMUR - Pre-Electrified - - - 121.04442 -8.70591 24256 5312071005 MASUMELI NUSA TENGGARA TIMUR 106 Pre-Electrified - - - 121.04982 -8.70917 24257 5312071005 MASUMELI NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 121.05009 -8.70741 24258 5312071006 SESO NUSA TENGGARA TIMUR 427 Pre-Electrified - - - 121.03883 -8.70180 24259 5312071006 SESO NUSA TENGGARA TIMUR 361 Pre-Electrified - - - 121.03631 -8.70878 24260 5312071006 SESO NUSA TENGGARA TIMUR 984 Pre-Electrified - - - 121.04333 -8.70524 24261 5312071006 SESO NUSA TENGGARA TIMUR 316 Pre-Electrified - - - 121.02185 -8.71606 24262 5312071006 SESO NUSA TENGGARA TIMUR 95 Pre-Electrified - - - 121.01756 -8.71579 24263 5312071007 WAEPANA NUSA TENGGARA TIMUR 1 463 Pre-Electrified - - - 121.03607 -8.69798 24264 5312080010 LENGKOSAMBI NUSA TENGGARA TIMUR 6 OffGrid Systems 2 1 698 0.4 121.13373 -8.44730 24265 5312080012 BENTENG TENGAH NUSA TENGGARA TIMUR - Pre-Electrified - - - 121.03099 -8.41437 24266 5312081001 WOLOMEZE NUSA TENGGARA TIMUR 207 MiniGrid Systems 45 38 205 8.2 120.98081 -8.59039 24267 5312081001 WOLOMEZE NUSA TENGGARA TIMUR 41 MiniGrid Systems 9 7 641 1.6 120.97878 -8.58744 24268 5313040009 TAL NUSA TENGGARA TIMUR 227 Pre-Electrified - - - 120.41373 -8.81599 24269 5313040010 PAKA NUSA TENGGARA TIMUR 1 258 Pre-Electrified - - - 120.42161 -8.81215 24270 5313040010 PAKA NUSA TENGGARA TIMUR 331 Pre-Electrified - - - 120.41876 -8.77935 24271 5313040010 PAKA NUSA TENGGARA TIMUR 376 Pre-Electrified - - - 120.41572 -8.79786 24272 5313040010 PAKA NUSA TENGGARA TIMUR 305 Pre-Electrified - - - 120.42697 -8.80374 24273 5313040010 PAKA NUSA TENGGARA TIMUR 304 Pre-Electrified - - - 120.42508 -8.81652 24274 5313040010 PAKA NUSA TENGGARA TIMUR 222 Pre-Electrified - - - 120.41509 -8.78622 24275 5313040010 PAKA NUSA TENGGARA TIMUR 100 Pre-Electrified - - - 120.41331 -8.75389 24276 5313040010 PAKA NUSA TENGGARA TIMUR 288 Pre-Electrified - - - 120.42597 -8.81306 24277 5313040010 PAKA NUSA TENGGARA TIMUR 194 Pre-Electrified - - - 120.41445 -8.81753 24278 5313040010 PAKA NUSA TENGGARA TIMUR 163 Pre-Electrified - - - 120.42046 -8.79435 24279 5313040010 PAKA NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 120.41803 -8.78112 Annex II – Demand forecast results Page 168 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 24280 5313040011 LEGU NUSA TENGGARA TIMUR 841 Pre-Electrified - - - 120.43382 -8.81447 24281 5313040011 LEGU NUSA TENGGARA TIMUR 620 Pre-Electrified - - - 120.43446 -8.80596 24282 5313040011 LEGU NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 120.43242 -8.81452 24283 5313040016 GOLO MUNTAS NUSA TENGGARA TIMUR 250 Pre-Electrified - - - 120.42389 -8.78487 24284 5313040016 GOLO MUNTAS NUSA TENGGARA TIMUR 115 Pre-Electrified - - - 120.42543 -8.78674 24285 5313040016 GOLO MUNTAS NUSA TENGGARA TIMUR 47 MiniGrid Systems 11 9 339 2.0 120.45159 -8.77218 24286 5313040019 WEWO NUSA TENGGARA TIMUR 410 Pre-Electrified - - - 120.43189 -8.72531 24287 5313040019 WEWO NUSA TENGGARA TIMUR 425 Pre-Electrified - - - 120.42631 -8.71689 24288 5313040019 WEWO NUSA TENGGARA TIMUR 164 Pre-Electrified - - - 120.43622 -8.72152 24289 5313040019 WEWO NUSA TENGGARA TIMUR 240 Pre-Electrified - - - 120.43529 -8.72272 24290 5313040019 WEWO NUSA TENGGARA TIMUR 178 Pre-Electrified - - - 120.43548 -8.71947 24291 5313040019 WEWO NUSA TENGGARA TIMUR 717 Pre-Electrified - - - 120.42365 -8.71787 24292 5313040021 UMUNG NUSA TENGGARA TIMUR 434 Pre-Electrified - - - 120.41383 -8.71018 24293 5313040021 UMUNG NUSA TENGGARA TIMUR 399 Pre-Electrified - - - 120.42132 -8.70889 24294 5313040021 UMUNG NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 120.41328 -8.70753 24295 5313040022 PONGGEOK NUSA TENGGARA TIMUR 532 Pre-Electrified - - - 120.41473 -8.72276 24296 5313040022 PONGGEOK NUSA TENGGARA TIMUR 281 Pre-Electrified - - - 120.41032 -8.73000 24297 5313040022 PONGGEOK NUSA TENGGARA TIMUR 203 Pre-Electrified - - - 120.41208 -8.72531 24298 5313040022 PONGGEOK NUSA TENGGARA TIMUR 51 Pre-Electrified - - - 120.41374 -8.71652 24299 5313040022 PONGGEOK NUSA TENGGARA TIMUR 64 Pre-Electrified - - - 120.41467 -8.71701 24300 5313040022 PONGGEOK NUSA TENGGARA TIMUR 36 Pre-Electrified - - - 120.41147 -8.74208 24301 5313040022 PONGGEOK NUSA TENGGARA TIMUR 141 Pre-Electrified - - - 120.40769 -8.72644 24302 5313040028 PAPANG NUSA TENGGARA TIMUR 686 Pre-Electrified - - - 120.40134 -8.71274 24303 5313040028 PAPANG NUSA TENGGARA TIMUR 769 Pre-Electrified - - - 120.40910 -8.70239 24304 5313040028 PAPANG NUSA TENGGARA TIMUR 392 Pre-Electrified - - - 120.40586 -8.71215 24305 5313040028 PAPANG NUSA TENGGARA TIMUR 100 Pre-Electrified - - - 120.40445 -8.70814 24306 5313040028 PAPANG NUSA TENGGARA TIMUR 125 Pre-Electrified - - - 120.40765 -8.71647 24307 5313040028 PAPANG NUSA TENGGARA TIMUR 331 Pre-Electrified - - - 120.40868 -8.70842 24308 5313040028 PAPANG NUSA TENGGARA TIMUR 149 Pre-Electrified - - - 120.40795 -8.70669 24309 5313040029 PONGKOR NUSA TENGGARA TIMUR 467 Pre-Electrified - - - 120.39224 -8.70465 24310 5313040029 PONGKOR NUSA TENGGARA TIMUR 211 Pre-Electrified - - - 120.40064 -8.70032 24311 5313040029 PONGKOR NUSA TENGGARA TIMUR 174 Pre-Electrified - - - 120.39648 -8.70498 24312 5313040034 NGKAER NUSA TENGGARA TIMUR 421 Pre-Electrified - - - 120.38689 -8.69680 24313 5313040036 JAONG NUSA TENGGARA TIMUR 124 Pre-Electrified - - - 120.39160 -8.62611 24314 5313040036 JAONG NUSA TENGGARA TIMUR 113 Pre-Electrified - - - 120.38969 -8.62543 24315 5313040036 JAONG NUSA TENGGARA TIMUR - Pre-Electrified - - - 120.38920 -8.62502 24316 5313041004 SATAR LENDA NUSA TENGGARA TIMUR 128 MiniGrid Systems 28 23 772 5.1 120.28394 -8.76924 24317 5313041009 BEA KONDO NUSA TENGGARA TIMUR 3 OffGrid Systems 1 849 0.2 120.38717 -8.75009 24318 5313041014 POPO NUSA TENGGARA TIMUR 511 Pre-Electrified - - - 120.38371 -8.70933 24319 5313041014 POPO NUSA TENGGARA TIMUR 233 Pre-Electrified - - - 120.38214 -8.70455 24320 5313041014 POPO NUSA TENGGARA TIMUR 137 Pre-Electrified - - - 120.37858 -8.70761 24321 5313041014 POPO NUSA TENGGARA TIMUR 97 Pre-Electrified - - - 120.37936 -8.70537 24322 5313041017 LING NUSA TENGGARA TIMUR 359 Pre-Electrified - - - 120.36909 -8.69742 24323 5313041018 NAO NUSA TENGGARA TIMUR 698 Pre-Electrified - - - 120.36192 -8.67259 24324 5313041018 NAO NUSA TENGGARA TIMUR 179 Pre-Electrified - - - 120.36872 -8.67781 24325 5313041018 NAO NUSA TENGGARA TIMUR 399 Pre-Electrified - - - 120.35847 -8.66756 24326 5313041018 NAO NUSA TENGGARA TIMUR 138 Pre-Electrified - - - 120.35745 -8.67545 24327 5313041019 CIRENG NUSA TENGGARA TIMUR 273 Pre-Electrified - - - 120.34120 -8.65104 24328 5313110001 GOLO DUKAL NUSA TENGGARA TIMUR 704 Pre-Electrified - - - 120.44617 -8.60673 24329 5313110001 GOLO DUKAL NUSA TENGGARA TIMUR 4 100 Pre-Electrified - - - 120.44597 -8.61508 24330 5313110001 GOLO DUKAL NUSA TENGGARA TIMUR 678 Pre-Electrified - - - 120.44166 -8.60581 24331 5313110002 PAU NUSA TENGGARA TIMUR 119 Pre-Electrified - - - 120.45006 -8.62633 24332 5313110002 PAU NUSA TENGGARA TIMUR 6 683 Pre-Electrified - - - 120.45859 -8.61427 24333 5313110002 PAU NUSA TENGGARA TIMUR 168 Pre-Electrified - - - 120.45133 -8.62310 24334 5313110002 PAU NUSA TENGGARA TIMUR 250 Pre-Electrified - - - 120.45115 -8.62108 24335 5313110002 PAU NUSA TENGGARA TIMUR 79 Pre-Electrified - - - 120.45336 -8.62213 24336 5313110003 WASO NUSA TENGGARA TIMUR 1 802 Pre-Electrified - - - 120.46305 -8.63035 24337 5313110003 WASO NUSA TENGGARA TIMUR 2 155 Pre-Electrified - - - 120.46178 -8.62092 24338 5313110003 WASO NUSA TENGGARA TIMUR 140 Pre-Electrified - - - 120.45541 -8.62343 24339 5313110003 WASO NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 120.45631 -8.62061 24340 5313110004 WATU NUSA TENGGARA TIMUR 10 Pre-Electrified - - - 120.46372 -8.62511 24341 5313110004 WATU NUSA TENGGARA TIMUR 8 947 Pre-Electrified - - - 120.46599 -8.61757 24342 5313110004 WATU NUSA TENGGARA TIMUR 176 Pre-Electrified - - - 120.47148 -8.61754 24343 5313110004 WATU NUSA TENGGARA TIMUR 116 Pre-Electrified - - - 120.47130 -8.62366 24344 5313110005 TENDA NUSA TENGGARA TIMUR 9 753 Pre-Electrified - - - 120.47432 -8.61069 24345 5313110005 TENDA NUSA TENGGARA TIMUR 428 Pre-Electrified - - - 120.47841 -8.59852 24346 5313110005 TENDA NUSA TENGGARA TIMUR 120 Pre-Electrified - - - 120.48300 -8.59931 24347 5313110005 TENDA NUSA TENGGARA TIMUR 214 Pre-Electrified - - - 120.47511 -8.59948 24348 5313110006 CAREP NUSA TENGGARA TIMUR 2 619 Pre-Electrified - - - 120.48158 -8.61144 24349 5313110006 CAREP NUSA TENGGARA TIMUR 709 Pre-Electrified - - - 120.48691 -8.61569 24350 5313110006 CAREP NUSA TENGGARA TIMUR 436 Pre-Electrified - - - 120.48984 -8.61650 24351 5313110006 CAREP NUSA TENGGARA TIMUR 234 Pre-Electrified - - - 120.49415 -8.61761 24352 5313110006 CAREP NUSA TENGGARA TIMUR 122 Pre-Electrified - - - 120.48728 -8.60801 24353 5313110006 CAREP NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 120.49472 -8.62112 24354 5313110006 CAREP NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 120.49038 -8.61096 24355 5313110006 CAREP NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 120.48257 -8.60621 24356 5313110007 MBAUMUKU NUSA TENGGARA TIMUR 2 826 Pre-Electrified - - - 120.46833 -8.60944 24357 5313110008 KAROT NUSA TENGGARA TIMUR 1 946 Pre-Electrified - - - 120.46609 -8.59220 24358 5313110008 KAROT NUSA TENGGARA TIMUR 3 653 Pre-Electrified - - - 120.46599 -8.59632 24359 5313110008 KAROT NUSA TENGGARA TIMUR 76 Pre-Electrified - - - 120.48103 -8.56076 24360 5313110009 PITAK NUSA TENGGARA TIMUR 1 560 Pre-Electrified - - - 120.45794 -8.60164 24361 5313110009 PITAK NUSA TENGGARA TIMUR 2 467 Pre-Electrified - - - 120.46240 -8.60773 24362 5313110010 LAWIR NUSA TENGGARA TIMUR 1 494 Pre-Electrified - - - 120.46092 -8.61167 24363 5313110011 WALI NUSA TENGGARA TIMUR 1 670 Pre-Electrified - - - 120.45285 -8.60318 24364 5313110011 WALI NUSA TENGGARA TIMUR 98 Pre-Electrified - - - 120.45590 -8.60236 Annex II – Demand forecast results Page 169 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 24365 5313110011 WALI NUSA TENGGARA TIMUR 632 Pre-Electrified - - - 120.44785 -8.60655 24366 5313110011 WALI NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 120.44946 -8.60813 24367 5313110011 WALI NUSA TENGGARA TIMUR 2 759 Pre-Electrified - - - 120.44669 -8.59662 24368 5313110011 WALI NUSA TENGGARA TIMUR 141 Pre-Electrified - - - 120.45267 -8.59666 24369 5313110011 WALI NUSA TENGGARA TIMUR 317 Pre-Electrified - - - 120.44024 -8.59073 24370 5313110011 WALI NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 120.43815 -8.59092 24371 5313120004 BULAN NUSA TENGGARA TIMUR 615 Pre-Electrified - - - 120.36407 -8.62754 24372 5313120004 BULAN NUSA TENGGARA TIMUR 664 Pre-Electrified - - - 120.36192 -8.63705 24373 5313120004 BULAN NUSA TENGGARA TIMUR 202 Pre-Electrified - - - 120.36072 -8.62912 24374 5313120004 BULAN NUSA TENGGARA TIMUR 64 Pre-Electrified - - - 120.35809 -8.63722 24375 5313120004 BULAN NUSA TENGGARA TIMUR 115 Pre-Electrified - - - 120.36244 -8.62386 24376 5313120004 BULAN NUSA TENGGARA TIMUR 270 Pre-Electrified - - - 120.37027 -8.60582 24377 5313120004 BULAN NUSA TENGGARA TIMUR 57 Pre-Electrified - - - 120.36520 -8.62367 24378 5313120005 PONG LAO NUSA TENGGARA TIMUR 1 665 Pre-Electrified - - - 120.38592 -8.61588 24379 5313120005 PONG LAO NUSA TENGGARA TIMUR 235 Pre-Electrified - - - 120.37890 -8.61226 24380 5313120006 CUMBI NUSA TENGGARA TIMUR 1 708 Pre-Electrified - - - 120.41326 -8.61260 24381 5313120006 CUMBI NUSA TENGGARA TIMUR 479 Pre-Electrified - - - 120.40965 -8.61447 24382 5313120006 CUMBI NUSA TENGGARA TIMUR 645 Pre-Electrified - - - 120.41165 -8.59738 24383 5313120006 CUMBI NUSA TENGGARA TIMUR 188 Pre-Electrified - - - 120.40753 -8.61782 24384 5313120006 CUMBI NUSA TENGGARA TIMUR 99 Pre-Electrified - - - 120.41248 -8.60366 24385 5313120006 CUMBI NUSA TENGGARA TIMUR 89 Pre-Electrified - - - 120.40502 -8.61682 24386 5313120006 CUMBI NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 120.41209 -8.60240 24387 5313120006 CUMBI NUSA TENGGARA TIMUR 107 Pre-Electrified - - - 120.41271 -8.61569 24388 5313120006 CUMBI NUSA TENGGARA TIMUR 56 Pre-Electrified - - - 120.41256 -8.59962 24389 5313120007 POCO LIKANG NUSA TENGGARA TIMUR 1 827 Pre-Electrified - - - 120.41942 -8.60974 24390 5313120007 POCO LIKANG NUSA TENGGARA TIMUR 108 Pre-Electrified - - - 120.42446 -8.60935 24391 5313120007 POCO LIKANG NUSA TENGGARA TIMUR 82 Pre-Electrified - - - 120.42637 -8.60593 24392 5313120007 POCO LIKANG NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 120.42760 -8.60454 24393 5313120007 POCO LIKANG NUSA TENGGARA TIMUR 294 Pre-Electrified - - - 120.41633 -8.59477 24394 5313120007 POCO LIKANG NUSA TENGGARA TIMUR 504 Pre-Electrified - - - 120.42277 -8.60732 24395 5313120007 POCO LIKANG NUSA TENGGARA TIMUR 36 Pre-Electrified - - - 120.41669 -8.59842 24396 5313120008 PONG MURUNG NUSA TENGGARA TIMUR 143 Pre-Electrified - - - 120.40926 -8.60581 24397 5313120008 PONG MURUNG NUSA TENGGARA TIMUR 1 050 Pre-Electrified - - - 120.40498 -8.60572 24398 5313120008 PONG MURUNG NUSA TENGGARA TIMUR 629 Pre-Electrified - - - 120.40678 -8.60003 24399 5313120008 PONG MURUNG NUSA TENGGARA TIMUR 240 Pre-Electrified - - - 120.40235 -8.60199 24400 5313120008 PONG MURUNG NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 120.39538 -8.59472 24401 5313120008 PONG MURUNG NUSA TENGGARA TIMUR 188 Pre-Electrified - - - 120.40185 -8.59325 24402 5313120008 PONG MURUNG NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 120.40065 -8.59848 24403 5313120008 PONG MURUNG NUSA TENGGARA TIMUR 74 Pre-Electrified - - - 120.40344 -8.59500 24404 5313120008 PONG MURUNG NUSA TENGGARA TIMUR 104 Pre-Electrified - - - 120.40002 -8.59269 24405 5313120008 PONG MURUNG NUSA TENGGARA TIMUR 55 Pre-Electrified - - - 120.40549 -8.59084 24406 5313120008 PONG MURUNG NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 120.40676 -8.60446 24407 5313120008 PONG MURUNG NUSA TENGGARA TIMUR 348 Pre-Electrified - - - 120.40408 -8.60000 24408 5313120009 PONG LEKO NUSA TENGGARA TIMUR 340 Pre-Electrified - - - 120.36239 -8.60100 24409 5313120009 PONG LEKO NUSA TENGGARA TIMUR 201 Pre-Electrified - - - 120.35236 -8.59353 24410 5313120011 BELANG TURI NUSA TENGGARA TIMUR 996 Pre-Electrified - - - 120.35162 -8.58981 24411 5313120011 BELANG TURI NUSA TENGGARA TIMUR 438 Pre-Electrified - - - 120.34970 -8.58573 24412 5313120011 BELANG TURI NUSA TENGGARA TIMUR 420 Pre-Electrified - - - 120.34813 -8.58370 24413 5313120011 BELANG TURI NUSA TENGGARA TIMUR 132 Pre-Electrified - - - 120.34832 -8.57935 24414 5313120012 GOLOWOROK NUSA TENGGARA TIMUR 978 Pre-Electrified - - - 120.34520 -8.57347 24415 5313120012 GOLOWOROK NUSA TENGGARA TIMUR 449 Pre-Electrified - - - 120.32017 -8.57148 24416 5313120012 GOLOWOROK NUSA TENGGARA TIMUR 211 Pre-Electrified - - - 120.32331 -8.57245 24417 5313120012 GOLOWOROK NUSA TENGGARA TIMUR - Pre-Electrified - - - 120.34850 -8.57870 24418 5313120013 MELER NUSA TENGGARA TIMUR 1 068 Pre-Electrified - - - 120.37098 -8.57989 24419 5313120013 MELER NUSA TENGGARA TIMUR 625 Pre-Electrified - - - 120.37397 -8.59098 24420 5313120013 MELER NUSA TENGGARA TIMUR 467 Pre-Electrified - - - 120.36313 -8.58191 24421 5313120013 MELER NUSA TENGGARA TIMUR 227 Pre-Electrified - - - 120.37394 -8.57875 24422 5313120013 MELER NUSA TENGGARA TIMUR 319 Pre-Electrified - - - 120.36035 -8.58188 24423 5313120013 MELER NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 120.36778 -8.58171 24424 5313120013 MELER NUSA TENGGARA TIMUR 97 Pre-Electrified - - - 120.35626 -8.58239 24425 5313120013 MELER NUSA TENGGARA TIMUR 144 Pre-Electrified - - - 120.37656 -8.57754 24426 5313120013 MELER NUSA TENGGARA TIMUR 52 Pre-Electrified - - - 120.37933 -8.57540 24427 5313120014 WAE BELANG NUSA TENGGARA TIMUR 258 Pre-Electrified - - - 120.37413 -8.59382 24428 5313120014 WAE BELANG NUSA TENGGARA TIMUR 2 872 Pre-Electrified - - - 120.38029 -8.58544 24429 5313120014 WAE BELANG NUSA TENGGARA TIMUR 119 Pre-Electrified - - - 120.37969 -8.58998 24430 5313120014 WAE BELANG NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 120.37589 -8.58774 24431 5313120014 WAE BELANG NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 120.37709 -8.58334 24432 5313120015 RAI NUSA TENGGARA TIMUR 1 391 Pre-Electrified - - - 120.39155 -8.58818 24433 5313120015 RAI NUSA TENGGARA TIMUR 244 Pre-Electrified - - - 120.38942 -8.59129 24434 5313120015 RAI NUSA TENGGARA TIMUR 211 Pre-Electrified - - - 120.39455 -8.59102 24435 5313120015 RAI NUSA TENGGARA TIMUR 270 Pre-Electrified - - - 120.39423 -8.59371 24436 5313120015 RAI NUSA TENGGARA TIMUR 109 Pre-Electrified - - - 120.38049 -8.58975 24437 5313120016 BENTENG KUWU NUSA TENGGARA TIMUR 822 Pre-Electrified - - - 120.41220 -8.59029 24438 5313120016 BENTENG KUWU NUSA TENGGARA TIMUR 408 Pre-Electrified - - - 120.41448 -8.58812 24439 5313120016 BENTENG KUWU NUSA TENGGARA TIMUR 203 Pre-Electrified - - - 120.41213 -8.58465 24440 5313120016 BENTENG KUWU NUSA TENGGARA TIMUR 55 Pre-Electrified - - - 120.43239 -8.59712 24441 5313120016 BENTENG KUWU NUSA TENGGARA TIMUR 1 021 Pre-Electrified - - - 120.42900 -8.60080 24442 5313120016 BENTENG KUWU NUSA TENGGARA TIMUR 25 Pre-Electrified - - - 120.41456 -8.58533 24443 5313120017 KAKOR NUSA TENGGARA TIMUR 612 Pre-Electrified - - - 120.41465 -8.57135 24444 5313120017 KAKOR NUSA TENGGARA TIMUR 434 Pre-Electrified - - - 120.41156 -8.57401 24445 5313120017 KAKOR NUSA TENGGARA TIMUR 316 Pre-Electrified - - - 120.41436 -8.56584 24446 5313120017 KAKOR NUSA TENGGARA TIMUR 169 Pre-Electrified - - - 120.41765 -8.57992 24447 5313120017 KAKOR NUSA TENGGARA TIMUR 329 Pre-Electrified - - - 120.42258 -8.57411 24448 5313120017 KAKOR NUSA TENGGARA TIMUR 918 Pre-Electrified - - - 120.41336 -8.57925 24449 5313120017 KAKOR NUSA TENGGARA TIMUR 104 Pre-Electrified - - - 120.41720 -8.57902 Annex II – Demand forecast results Page 170 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 24450 5313120017 KAKOR NUSA TENGGARA TIMUR 103 Pre-Electrified - - - 120.40993 -8.57561 24451 5313120018 BEO RAHONG NUSA TENGGARA TIMUR 327 Pre-Electrified - - - 120.38764 -8.57578 24452 5313120018 BEO RAHONG NUSA TENGGARA TIMUR 231 Pre-Electrified - - - 120.38784 -8.56915 24453 5313120018 BEO RAHONG NUSA TENGGARA TIMUR 397 Pre-Electrified - - - 120.38246 -8.57152 24454 5313120018 BEO RAHONG NUSA TENGGARA TIMUR 81 Pre-Electrified - - - 120.40055 -8.57155 24455 5313120018 BEO RAHONG NUSA TENGGARA TIMUR 109 Pre-Electrified - - - 120.39927 -8.57350 24456 5313120018 BEO RAHONG NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 120.39211 -8.57861 24457 5313120018 BEO RAHONG NUSA TENGGARA TIMUR 114 Pre-Electrified - - - 120.40189 -8.57025 24458 5313120018 BEO RAHONG NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 120.39061 -8.56966 24459 5313120018 BEO RAHONG NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 120.39669 -8.57388 24460 5313120029 BANGKA LAO NUSA TENGGARA TIMUR 924 Pre-Electrified - - - 120.39019 -8.61797 24461 5313120029 BANGKA LAO NUSA TENGGARA TIMUR 310 Pre-Electrified - - - 120.39157 -8.62079 24462 5313120029 BANGKA LAO NUSA TENGGARA TIMUR 167 Pre-Electrified - - - 120.39717 -8.61783 24463 5313120029 BANGKA LAO NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 120.38973 -8.60880 24464 5313120029 BANGKA LAO NUSA TENGGARA TIMUR 324 Pre-Electrified - - - 120.38670 -8.60598 24465 5313120029 BANGKA LAO NUSA TENGGARA TIMUR 275 Pre-Electrified - - - 120.39107 -8.61591 24466 5313121001 LALONG NUSA TENGGARA TIMUR 1 322 Pre-Electrified - - - 120.44323 -8.57735 24467 5313121001 LALONG NUSA TENGGARA TIMUR 200 Pre-Electrified - - - 120.44473 -8.57954 24468 5313121002 BANGKA KENDA NUSA TENGGARA TIMUR 409 Pre-Electrified - - - 120.44872 -8.58047 24469 5313121003 NDEHES NUSA TENGGARA TIMUR 655 Pre-Electrified - - - 120.49092 -8.55863 24470 5313121003 NDEHES NUSA TENGGARA TIMUR 290 Pre-Electrified - - - 120.47876 -8.57623 24471 5313121003 NDEHES NUSA TENGGARA TIMUR 131 Pre-Electrified - - - 120.48994 -8.56118 24472 5313121003 NDEHES NUSA TENGGARA TIMUR 129 Pre-Electrified - - - 120.48939 -8.56251 24473 5313121003 NDEHES NUSA TENGGARA TIMUR 92 Pre-Electrified - - - 120.48812 -8.55401 24474 5313121003 NDEHES NUSA TENGGARA TIMUR 137 Pre-Electrified - - - 120.48895 -8.55515 24475 5313121003 NDEHES NUSA TENGGARA TIMUR 689 Pre-Electrified - - - 120.48460 -8.56191 24476 5313121004 BANGKA JONG NUSA TENGGARA TIMUR 468 Pre-Electrified - - - 120.49664 -8.58915 24477 5313121004 BANGKA JONG NUSA TENGGARA TIMUR 323 Pre-Electrified - - - 120.49303 -8.57981 24478 5313121004 BANGKA JONG NUSA TENGGARA TIMUR 170 Pre-Electrified - - - 120.49685 -8.60356 24479 5313121004 BANGKA JONG NUSA TENGGARA TIMUR 143 Pre-Electrified - - - 120.50078 -8.60584 24480 5313121005 WAE RII NUSA TENGGARA TIMUR 846 Pre-Electrified - - - 120.49691 -8.61527 24481 5313121005 WAE RII NUSA TENGGARA TIMUR 255 Pre-Electrified - - - 120.49802 -8.61232 24482 5313121005 WAE RII NUSA TENGGARA TIMUR 26 Pre-Electrified - - - 120.49976 -8.61334 24483 5313121005 WAE RII NUSA TENGGARA TIMUR 536 Pre-Electrified - - - 120.50119 -8.61609 24484 5313121005 WAE RII NUSA TENGGARA TIMUR 243 Pre-Electrified - - - 120.50219 -8.60916 24485 5313121005 WAE RII NUSA TENGGARA TIMUR 29 Pre-Electrified - - - 120.50028 -8.61317 24486 5313121006 LONGKO NUSA TENGGARA TIMUR 852 Pre-Electrified - - - 120.50321 -8.60943 24487 5313121007 RANAKA NUSA TENGGARA TIMUR 824 Pre-Electrified - - - 120.51511 -8.61331 24488 5313121007 RANAKA NUSA TENGGARA TIMUR 758 Pre-Electrified - - - 120.52069 -8.61007 24489 5313121009 GOLO CADOR NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 120.49912 -8.58085 24490 5313121009 GOLO CADOR NUSA TENGGARA TIMUR 1 775 Pre-Electrified - - - 120.50302 -8.57794 24491 5313121010 COMPANG NDEHES NUSA TENGGARA TIMUR 191 Pre-Electrified - - - 120.49884 -8.55002 24492 5313121010 COMPANG NDEHES NUSA TENGGARA TIMUR 280 Pre-Electrified - - - 120.49361 -8.54494 24493 5313121010 COMPANG NDEHES NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 120.49019 -8.54832 24494 5313121010 COMPANG NDEHES NUSA TENGGARA TIMUR 421 Pre-Electrified - - - 120.49531 -8.54818 24495 5313121010 COMPANG NDEHES NUSA TENGGARA TIMUR 75 Pre-Electrified - - - 120.49192 -8.54655 24496 5313121010 COMPANG NDEHES NUSA TENGGARA TIMUR 24 Pre-Electrified - - - 120.49728 -8.54599 24497 5313121011 POCO NUSA TENGGARA TIMUR 1 197 Pre-Electrified - - - 120.48974 -8.54813 24498 5313121011 POCO NUSA TENGGARA TIMUR 452 Pre-Electrified - - - 120.48853 -8.53794 24499 5313121011 POCO NUSA TENGGARA TIMUR 251 Pre-Electrified - - - 120.49868 -8.53781 24500 5313121011 POCO NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 120.48783 -8.55228 24501 5313121013 GOLO WUA NUSA TENGGARA TIMUR 484 Pre-Electrified - - - 120.43774 -8.56072 24502 5313121013 GOLO WUA NUSA TENGGARA TIMUR 176 Pre-Electrified - - - 120.44328 -8.56055 24503 5313121013 GOLO WUA NUSA TENGGARA TIMUR 177 Pre-Electrified - - - 120.44111 -8.56400 24504 5313121014 GOLO WATU NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 120.44561 -8.55377 24505 5313121014 GOLO WATU NUSA TENGGARA TIMUR 19 Pre-Electrified - - - 120.44442 -8.56064 24506 5313121014 GOLO WATU NUSA TENGGARA TIMUR 1 008 Pre-Electrified - - - 120.44488 -8.55571 24507 5313121014 GOLO WATU NUSA TENGGARA TIMUR 297 Pre-Electrified - - - 120.44554 -8.56062 24508 5313121014 GOLO WATU NUSA TENGGARA TIMUR 251 Pre-Electrified - - - 120.44673 -8.56852 24509 5313121014 GOLO WATU NUSA TENGGARA TIMUR 382 Pre-Electrified - - - 120.44825 -8.55797 24510 5313121015 RANGGI NUSA TENGGARA TIMUR 1 107 Pre-Electrified - - - 120.44495 -8.55187 24511 5313121015 RANGGI NUSA TENGGARA TIMUR 215 Pre-Electrified - - - 120.44659 -8.55139 24512 5313122002 LAMBA KETANG NUSA TENGGARA TIMUR 401 Pre-Electrified - - - 120.33418 -8.64291 24513 5313122002 LAMBA KETANG NUSA TENGGARA TIMUR 643 Pre-Electrified - - - 120.33371 -8.63600 24514 5313122002 LAMBA KETANG NUSA TENGGARA TIMUR 285 Pre-Electrified - - - 120.34216 -8.64554 24515 5313122002 LAMBA KETANG NUSA TENGGARA TIMUR 242 Pre-Electrified - - - 120.33502 -8.64039 24516 5313122002 LAMBA KETANG NUSA TENGGARA TIMUR 219 Pre-Electrified - - - 120.33412 -8.64609 24517 5313122002 LAMBA KETANG NUSA TENGGARA TIMUR 198 Pre-Electrified - - - 120.33758 -8.63621 24518 5313122002 LAMBA KETANG NUSA TENGGARA TIMUR 293 Pre-Electrified - - - 120.33134 -8.64183 24519 5313122002 LAMBA KETANG NUSA TENGGARA TIMUR - Pre-Electrified - - - 120.30612 -8.62502 24520 5313122003 BANGKA LELAK NUSA TENGGARA TIMUR 501 Pre-Electrified - - - 120.33119 -8.63224 24521 5313122003 BANGKA LELAK NUSA TENGGARA TIMUR 225 Pre-Electrified - - - 120.33364 -8.62980 24522 5313123002 DIMPONG NUSA TENGGARA TIMUR - Pre-Electrified - - - 120.35852 -8.54040 24523 5313123006 LIANG BUA NUSA TENGGARA TIMUR 34 MiniGrid Systems 8 6 792 1.5 120.44059 -8.53793 24524 5313123012 WAE MANTANG NUSA TENGGARA TIMUR 67 MiniGrid Systems 15 12 735 2.7 120.39833 -8.47078 24525 5313123012 WAE MANTANG NUSA TENGGARA TIMUR 36 MiniGrid Systems 8 6 792 1.5 120.40026 -8.46974 24526 5313130002 NENU NUSA TENGGARA TIMUR 756 Pre-Electrified - - - 120.49273 -8.51275 24527 5313130002 NENU NUSA TENGGARA TIMUR 438 Pre-Electrified - - - 120.48858 -8.52020 24528 5313130002 NENU NUSA TENGGARA TIMUR 364 Pre-Electrified - - - 120.48422 -8.51515 24529 5313130002 NENU NUSA TENGGARA TIMUR 262 Pre-Electrified - - - 120.48954 -8.51792 24530 5313130002 NENU NUSA TENGGARA TIMUR 108 Pre-Electrified - - - 120.49465 -8.51575 24531 5313130002 NENU NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 120.49437 -8.51729 24532 5313130002 NENU NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 120.49428 -8.51483 24533 5313130002 NENU NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 120.48124 -8.51514 24534 5313130003 WUDI NUSA TENGGARA TIMUR 499 Pre-Electrified - - - 120.50672 -8.53269 Annex II – Demand forecast results Page 171 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 24535 5313130003 WUDI NUSA TENGGARA TIMUR 447 Pre-Electrified - - - 120.50481 -8.53318 24536 5313130003 WUDI NUSA TENGGARA TIMUR 236 Pre-Electrified - - - 120.50889 -8.53512 24537 5313130003 WUDI NUSA TENGGARA TIMUR 104 Pre-Electrified - - - 120.50797 -8.53318 24538 5313130003 WUDI NUSA TENGGARA TIMUR 102 Pre-Electrified - - - 120.50230 -8.53200 24539 5313130009 PAGAL NUSA TENGGARA TIMUR 1 749 Pre-Electrified - - - 120.49308 -8.51041 24540 5313130009 PAGAL NUSA TENGGARA TIMUR 310 Pre-Electrified - - - 120.48649 -8.50667 24541 5313130009 PAGAL NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 120.48837 -8.51284 24542 5313130009 PAGAL NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 120.49046 -8.51042 24543 5313130009 PAGAL NUSA TENGGARA TIMUR 133 Pre-Electrified - - - 120.48437 -8.49777 24544 5313130009 PAGAL NUSA TENGGARA TIMUR 133 Pre-Electrified - - - 120.48056 -8.49194 24545 5313130009 PAGAL NUSA TENGGARA TIMUR 13 Pre-Electrified - - - 120.48885 -8.48686 24546 5313130009 PAGAL NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 120.48120 -8.49023 24547 5313130010 LENDA NUSA TENGGARA TIMUR 74 MiniGrid Systems 17 14 433 3.1 120.42959 -8.49831 24548 5313130012 GAPONG NUSA TENGGARA TIMUR 483 Pre-Electrified - - - 120.48539 -8.47336 24549 5313130012 GAPONG NUSA TENGGARA TIMUR 244 Pre-Electrified - - - 120.48498 -8.48663 24550 5313130012 GAPONG NUSA TENGGARA TIMUR 204 Pre-Electrified - - - 120.48651 -8.46754 24551 5313130016 LANGKAS NUSA TENGGARA TIMUR - Pre-Electrified - - - 120.50000 -8.45681 24552 5313140010 MATA AIR NUSA TENGGARA TIMUR 1 852 Pre-Electrified - - - 120.48544 -8.31136 24553 5313140011 SALAMA NUSA TENGGARA TIMUR - Pre-Electrified - - - 120.48250 -8.31322 24554 5313140011 SALAMA NUSA TENGGARA TIMUR 127 Pre-Electrified - - - 120.48126 -8.31435 24555 5313140011 SALAMA NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 120.47397 -8.31244 24556 5313140011 SALAMA NUSA TENGGARA TIMUR 158 Pre-Electrified - - - 120.47668 -8.32150 24557 5313140011 SALAMA NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 120.48199 -8.31335 24558 5313140012 REO NUSA TENGGARA TIMUR 2 338 Pre-Electrified - - - 120.49126 -8.31095 24559 5313140013 BARU NUSA TENGGARA TIMUR 1 352 Pre-Electrified - - - 120.49125 -8.30791 24560 5313140013 BARU NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 120.49083 -8.30382 24561 5313140013 BARU NUSA TENGGARA TIMUR 295 Pre-Electrified - - - 120.49127 -8.30162 24562 5313140015 ROBEK NUSA TENGGARA TIMUR 58 MiniGrid Systems 15 12 735 2.7 120.41551 -8.26000 24563 5314010007 LALUKOEN NUSA TENGGARA TIMUR 1 416 Pre-Electrified - - - 122.92789 -10.86456 24564 5314010009 OEHANDI NUSA TENGGARA TIMUR 1 615 Pre-Electrified - - - 122.94843 -10.85286 24565 5314010010 MEOAIN NUSA TENGGARA TIMUR 1 706 Pre-Electrified - - - 122.95833 -10.83763 24566 5314010011 OEBAFFOK NUSA TENGGARA TIMUR 1 323 Pre-Electrified - - - 122.97755 -10.82299 24567 5314010012 BATUTUA NUSA TENGGARA TIMUR 1 624 Pre-Electrified - - - 122.98201 -10.85456 24568 5314010013 DOLASI NUSA TENGGARA TIMUR 995 Pre-Electrified - - - 123.00754 -10.85699 24569 5314020005 MODOSINAL NUSA TENGGARA TIMUR 1 329 Pre-Electrified - - - 122.96658 -10.79517 24570 5314020006 BUSALANGGA NUSA TENGGARA TIMUR 3 427 Pre-Electrified - - - 122.99917 -10.79646 24571 5314020008 DAUDOLU NUSA TENGGARA TIMUR 1 577 Pre-Electrified - - - 122.98804 -10.74801 24572 5314020009 NETENAEN NUSA TENGGARA TIMUR 2 289 Pre-Electrified - - - 122.94700 -10.75608 24573 5314020011 OELUA NUSA TENGGARA TIMUR 2 790 Pre-Electrified - - - 122.91438 -10.76731 24574 5314020014 BONI NUSA TENGGARA TIMUR 2 280 Pre-Electrified - - - 122.86207 -10.79581 24575 5314030001 KULI NUSA TENGGARA TIMUR 1 869 Pre-Electrified - - - 123.06272 -10.83355 24576 5314030002 SUELAIN NUSA TENGGARA TIMUR 684 Pre-Electrified - - - 123.09262 -10.81815 24577 5314030003 BEBALAIN NUSA TENGGARA TIMUR 1 146 Pre-Electrified - - - 123.11928 -10.79876 24578 5314030004 KOLOBOLON NUSA TENGGARA TIMUR 1 206 Pre-Electrified - - - 123.14194 -10.79356 24579 5314030005 OEMATAMBOLI NUSA TENGGARA TIMUR 1 245 Pre-Electrified - - - 123.11925 -10.76914 24580 5314030008 MOKDALE NUSA TENGGARA TIMUR 3 837 Pre-Electrified - - - 123.05454 -10.75303 24581 5314030009 SANGGAOEN NUSA TENGGARA TIMUR 2 112 Pre-Electrified - - - 123.05322 -10.77428 24582 5314030012 BAADALE NUSA TENGGARA TIMUR 1 161 Pre-Electrified - - - 123.03466 -10.73437 24583 5314030013 NAMODALE NUSA TENGGARA TIMUR 3 047 Pre-Electrified - - - 123.04591 -10.73063 24584 5314030014 METINA NUSA TENGGARA TIMUR 2 887 Pre-Electrified - - - 123.05810 -10.71737 24585 5314040012 ONOTALI NUSA TENGGARA TIMUR 1 478 Pre-Electrified - - - 123.11280 -10.68020 24586 5314041004 DALEHOLU NUSA TENGGARA TIMUR 1 753 Pre-Electrified - - - 123.17682 -10.78825 24587 5314041005 LENGUSELU NUSA TENGGARA TIMUR 1 011 Pre-Electrified - - - 123.19491 -10.76249 24588 5314050001 NUSAKDALE NUSA TENGGARA TIMUR 877 Pre-Electrified - - - 123.22471 -10.74818 24589 5314050008 EDALODE NUSA TENGGARA TIMUR 956 Pre-Electrified - - - 123.26131 -10.62349 24590 5314050011 TESABELA NUSA TENGGARA TIMUR 1 457 Pre-Electrified - - - 123.21921 -10.60862 24591 5314060001 LAKAMOLA NUSA TENGGARA TIMUR 1 996 Pre-Electrified - - - 123.33695 -10.65321 24592 5314060002 MUKEKUKU NUSA TENGGARA TIMUR 2 168 Pre-Electrified - - - 123.36631 -10.67117 24593 5314060004 HUNDI HOPO NUSA TENGGARA TIMUR 945 Pre-Electrified - - - 123.39580 -10.63593 24594 5314060005 LONDALUSI NUSA TENGGARA TIMUR 3 783 Pre-Electrified - - - 123.38356 -10.62170 24595 5314070005 OENITAS NUSA TENGGARA TIMUR 1 686 Pre-Electrified - - - 122.86998 -10.84834 24596 5315010003 PASIR PANJANG NUSA TENGGARA TIMUR 82 MiniGrid Systems 20 16 980 3.7 119.75692 -8.59123 24597 5315010008 MACANG TANGGAR NUSA TENGGARA TIMUR 76 MiniGrid Systems 18 15 282 3.3 119.81263 -8.56407 24598 5315010008 MACANG TANGGAR NUSA TENGGARA TIMUR 75 Pre-Electrified - - - 119.86963 -8.52290 24599 5315010008 MACANG TANGGAR NUSA TENGGARA TIMUR 85 Pre-Electrified - - - 119.87016 -8.52762 24600 5315010008 MACANG TANGGAR NUSA TENGGARA TIMUR 31 MiniGrid Systems 7 5 943 1.3 119.85724 -8.53241 24601 5315010010 GORON TALO NUSA TENGGARA TIMUR 180 Pre-Electrified - - - 119.88962 -8.50054 24602 5315010010 GORON TALO NUSA TENGGARA TIMUR 156 Pre-Electrified - - - 119.88414 -8.50159 24603 5315010010 GORON TALO NUSA TENGGARA TIMUR 632 Pre-Electrified - - - 119.89081 -8.50242 24604 5315010010 GORON TALO NUSA TENGGARA TIMUR 269 Pre-Electrified - - - 119.88849 -8.50280 24605 5315010010 GORON TALO NUSA TENGGARA TIMUR 67 Pre-Electrified - - - 119.88945 -8.50347 24606 5315010010 GORON TALO NUSA TENGGARA TIMUR 300 Pre-Electrified - - - 119.88408 -8.50480 24607 5315010010 GORON TALO NUSA TENGGARA TIMUR 511 Pre-Electrified - - - 119.89015 -8.50505 24608 5315010010 GORON TALO NUSA TENGGARA TIMUR 290 Pre-Electrified - - - 119.88621 -8.50896 24609 5315010010 GORON TALO NUSA TENGGARA TIMUR 69 Pre-Electrified - - - 119.87734 -8.50952 24610 5315010010 GORON TALO NUSA TENGGARA TIMUR 948 Pre-Electrified - - - 119.88237 -8.50138 24611 5315010010 GORON TALO NUSA TENGGARA TIMUR 549 Pre-Electrified - - - 119.88456 -8.49728 24612 5315010010 GORON TALO NUSA TENGGARA TIMUR 100 Pre-Electrified - - - 119.88248 -8.49692 24613 5315010010 GORON TALO NUSA TENGGARA TIMUR 20 Pre-Electrified - - - 119.88968 -8.49993 24614 5315010010 GORON TALO NUSA TENGGARA TIMUR 614 Pre-Electrified - - - 119.88228 -8.49978 24615 5315010011 GOLO BILAS NUSA TENGGARA TIMUR 354 Pre-Electrified - - - 119.89308 -8.53841 24616 5315010011 GOLO BILAS NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 119.88918 -8.53866 24617 5315010011 GOLO BILAS NUSA TENGGARA TIMUR 376 Pre-Electrified - - - 119.89714 -8.54045 24618 5315010011 GOLO BILAS NUSA TENGGARA TIMUR 502 Pre-Electrified - - - 119.90013 -8.54458 24619 5315010011 GOLO BILAS NUSA TENGGARA TIMUR 179 Pre-Electrified - - - 119.89795 -8.54680 Annex II – Demand forecast results Page 172 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 24620 5315010011 GOLO BILAS NUSA TENGGARA TIMUR 197 Pre-Electrified - - - 119.89058 -8.52339 24621 5315010011 GOLO BILAS NUSA TENGGARA TIMUR 71 Pre-Electrified - - - 119.88954 -8.51841 24622 5315010011 GOLO BILAS NUSA TENGGARA TIMUR 123 Pre-Electrified - - - 119.88933 -8.52002 24623 5315010011 GOLO BILAS NUSA TENGGARA TIMUR 20 Pre-Electrified - - - 119.88823 -8.52042 24624 5315010011 GOLO BILAS NUSA TENGGARA TIMUR 754 Pre-Electrified - - - 119.89163 -8.53068 24625 5315010012 NGGORANG NUSA TENGGARA TIMUR 1 077 Pre-Electrified - - - 119.91927 -8.54960 24626 5315010012 NGGORANG NUSA TENGGARA TIMUR 425 Pre-Electrified - - - 119.92394 -8.55468 24627 5315010013 WATU NGGELEK NUSA TENGGARA TIMUR 68 MiniGrid Systems 18 15 282 3.3 119.92101 -8.57255 24628 5315010023 WAE KELAMBU NUSA TENGGARA TIMUR 702 Pre-Electrified - - - 119.90361 -8.50554 24629 5315010023 WAE KELAMBU NUSA TENGGARA TIMUR 1 060 Pre-Electrified - - - 119.90832 -8.49507 24630 5315010023 WAE KELAMBU NUSA TENGGARA TIMUR 258 Pre-Electrified - - - 119.89616 -8.49340 24631 5315010023 WAE KELAMBU NUSA TENGGARA TIMUR 1 679 Pre-Electrified - - - 119.88879 -8.49570 24632 5315010023 WAE KELAMBU NUSA TENGGARA TIMUR 134 Pre-Electrified - - - 119.89253 -8.49712 24633 5315010023 WAE KELAMBU NUSA TENGGARA TIMUR 117 Pre-Electrified - - - 119.89712 -8.49906 24634 5315010023 WAE KELAMBU NUSA TENGGARA TIMUR 216 Pre-Electrified - - - 119.89566 -8.49166 24635 5315010024 BATU CERMIN NUSA TENGGARA TIMUR 231 Pre-Electrified - - - 119.88714 -8.49315 24636 5315010024 BATU CERMIN NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 119.89290 -8.49680 24637 5315010024 BATU CERMIN NUSA TENGGARA TIMUR 278 Pre-Electrified - - - 119.89184 -8.46433 24638 5315010024 BATU CERMIN NUSA TENGGARA TIMUR 2 935 Pre-Electrified - - - 119.89849 -8.48710 24639 5315010025 LABUAN BAJO NUSA TENGGARA TIMUR 300 Pre-Electrified - - - 119.88628 -8.49172 24640 5315010025 LABUAN BAJO NUSA TENGGARA TIMUR 188 Pre-Electrified - - - 119.88080 -8.49498 24641 5315010025 LABUAN BAJO NUSA TENGGARA TIMUR 185 Pre-Electrified - - - 119.88105 -8.49721 24642 5315010025 LABUAN BAJO NUSA TENGGARA TIMUR 3 011 Pre-Electrified - - - 119.87822 -8.49389 24643 5315011003 MBUIT NUSA TENGGARA TIMUR 45 MiniGrid Systems 11 9 339 2.0 120.11040 -8.47481 24644 5315020001 MATA WAE NUSA TENGGARA TIMUR 79 MiniGrid Systems 19 16 131 3.5 119.93604 -8.74947 24645 5315020009 NAMPAR MACING NUSA TENGGARA TIMUR 273 Pre-Electrified - - - 120.07178 -8.64760 24646 5315020009 NAMPAR MACING NUSA TENGGARA TIMUR 316 Pre-Electrified - - - 120.07213 -8.65494 24647 5315020010 GOLO LELENG NUSA TENGGARA TIMUR 1 245 Pre-Electrified - - - 120.10382 -8.65521 24648 5315020011 GOLO TANTONG NUSA TENGGARA TIMUR 197 Pre-Electrified - - - 120.10423 -8.64895 24649 5315020011 GOLO TANTONG NUSA TENGGARA TIMUR 356 Pre-Electrified - - - 120.08503 -8.65095 24650 5315020012 KEMPO NUSA TENGGARA TIMUR 213 Pre-Electrified - - - 120.05157 -8.62596 24651 5315020012 KEMPO NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 120.07062 -8.62566 24652 5315020012 KEMPO NUSA TENGGARA TIMUR 757 Pre-Electrified - - - 120.05271 -8.62337 24653 5315020012 KEMPO NUSA TENGGARA TIMUR 110 Pre-Electrified - - - 120.04998 -8.62012 24654 5315020013 WATU WANGKA NUSA TENGGARA TIMUR 81 MiniGrid Systems 20 16 980 3.7 120.09630 -8.58634 24655 5315020013 WATU WANGKA NUSA TENGGARA TIMUR 396 Pre-Electrified - - - 120.05958 -8.61290 24656 5315020015 GOLO DESAT NUSA TENGGARA TIMUR 71 MiniGrid Systems 17 14 433 3.1 120.03562 -8.62671 24657 5315020015 GOLO DESAT NUSA TENGGARA TIMUR 305 Pre-Electrified - - - 120.04494 -8.61245 24658 5315020015 GOLO DESAT NUSA TENGGARA TIMUR 106 Pre-Electrified - - - 120.04210 -8.61011 24659 5315020015 GOLO DESAT NUSA TENGGARA TIMUR 226 Pre-Electrified - - - 120.04001 -8.62033 24660 5315020017 LIANG NDARA NUSA TENGGARA TIMUR 107 MiniGrid Systems 28 23 772 5.1 119.92587 -8.60520 24661 5315020021 GOLO NDOAL NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 120.04328 -8.58270 24662 5315020021 GOLO NDOAL NUSA TENGGARA TIMUR 468 Pre-Electrified - - - 120.04673 -8.58480 24663 5315020021 GOLO NDOAL NUSA TENGGARA TIMUR 275 Pre-Electrified - - - 120.04205 -8.58378 24664 5315020021 GOLO NDOAL NUSA TENGGARA TIMUR 129 Pre-Electrified - - - 120.03690 -8.58428 24665 5315020021 GOLO NDOAL NUSA TENGGARA TIMUR 127 Pre-Electrified - - - 120.04625 -8.59327 24666 5315020021 GOLO NDOAL NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 120.03698 -8.59780 24667 5315020022 GOLO SEMBEA NUSA TENGGARA TIMUR 418 Pre-Electrified - - - 120.05723 -8.58456 24668 5315020022 GOLO SEMBEA NUSA TENGGARA TIMUR 298 Pre-Electrified - - - 120.05164 -8.59339 24669 5315020022 GOLO SEMBEA NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 120.05882 -8.58745 24670 5315020022 GOLO SEMBEA NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 120.05061 -8.59600 24671 5315020022 GOLO SEMBEA NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 120.05872 -8.58858 24672 5315020023 TIWU RIWUNG NUSA TENGGARA TIMUR 208 Pre-Electrified - - - 120.03083 -8.57449 24673 5315020023 TIWU RIWUNG NUSA TENGGARA TIMUR 342 Pre-Electrified - - - 120.03687 -8.57507 24674 5315020023 TIWU RIWUNG NUSA TENGGARA TIMUR 125 Pre-Electrified - - - 120.04829 -8.57415 24675 5315020023 TIWU RIWUNG NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 120.04100 -8.57381 24676 5315030001 NANGA BERE NUSA TENGGARA TIMUR 144 MiniGrid Systems 29 24 621 5.3 120.01391 -8.81754 24677 5315030003 NANGA LILI NUSA TENGGARA TIMUR 832 Pre-Electrified - - - 120.13143 -8.77732 24678 5315030003 NANGA LILI NUSA TENGGARA TIMUR 380 Pre-Electrified - - - 120.12856 -8.76404 24679 5315030003 NANGA LILI NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 120.13118 -8.76431 24680 5315030003 NANGA LILI NUSA TENGGARA TIMUR 74 Pre-Electrified - - - 120.13415 -8.77707 24681 5315030008 LALONG NUSA TENGGARA TIMUR 647 Pre-Electrified - - - 120.23878 -8.70929 24682 5315030008 LALONG NUSA TENGGARA TIMUR 528 Pre-Electrified - - - 120.23240 -8.70066 24683 5315030008 LALONG NUSA TENGGARA TIMUR 131 Pre-Electrified - - - 120.22729 -8.70604 24684 5315030008 LALONG NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 120.23264 -8.70525 24685 5315030008 LALONG NUSA TENGGARA TIMUR 217 Pre-Electrified - - - 120.23034 -8.70681 24686 5315030009 KAKOR NUSA TENGGARA TIMUR 1 870 Pre-Electrified - - - 120.21601 -8.70961 24687 5315030009 KAKOR NUSA TENGGARA TIMUR 16 Pre-Electrified - - - 120.20319 -8.70477 24688 5315030009 KAKOR NUSA TENGGARA TIMUR 267 Pre-Electrified - - - 120.20834 -8.70518 24689 5315030009 KAKOR NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 120.20542 -8.70499 24690 5315030010 WAE MOSE NUSA TENGGARA TIMUR 301 Pre-Electrified - - - 120.20019 -8.70423 24691 5315030010 WAE MOSE NUSA TENGGARA TIMUR 155 Pre-Electrified - - - 120.20145 -8.70319 24692 5315030010 WAE MOSE NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 120.17310 -8.71765 24693 5315030011 TANGGE NUSA TENGGARA TIMUR 110 Pre-Electrified - - - 120.13192 -8.75088 24694 5315030011 TANGGE NUSA TENGGARA TIMUR 10 Pre-Electrified - - - 120.13060 -8.75018 24695 5315030011 TANGGE NUSA TENGGARA TIMUR 1 032 Pre-Electrified - - - 120.13741 -8.71419 24696 5315030011 TANGGE NUSA TENGGARA TIMUR 323 Pre-Electrified - - - 120.16523 -8.71337 24697 5315030011 TANGGE NUSA TENGGARA TIMUR 460 Pre-Electrified - - - 120.13685 -8.74098 24698 5315030011 TANGGE NUSA TENGGARA TIMUR 370 Pre-Electrified - - - 120.13465 -8.74677 24699 5315030011 TANGGE NUSA TENGGARA TIMUR 60 Pre-Electrified - - - 120.14312 -8.73587 24700 5315030011 TANGGE NUSA TENGGARA TIMUR 104 Pre-Electrified - - - 120.14552 -8.71793 24701 5315030011 TANGGE NUSA TENGGARA TIMUR 138 Pre-Electrified - - - 120.16842 -8.71258 24702 5315030011 TANGGE NUSA TENGGARA TIMUR 73 Pre-Electrified - - - 120.14805 -8.72829 24703 5315030011 TANGGE NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 120.14187 -8.71761 24704 5315030011 TANGGE NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 120.14638 -8.73277 Annex II – Demand forecast results Page 173 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 24705 5315030011 TANGGE NUSA TENGGARA TIMUR 29 Pre-Electrified - - - 120.13016 -8.74966 24706 5315030011 TANGGE NUSA TENGGARA TIMUR 28 Pre-Electrified - - - 120.15037 -8.71720 24707 5315030011 TANGGE NUSA TENGGARA TIMUR 614 Pre-Electrified - - - 120.16672 -8.70803 24708 5315030011 TANGGE NUSA TENGGARA TIMUR 130 Pre-Electrified - - - 120.16764 -8.71024 24709 5315030011 TANGGE NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 120.16573 -8.71614 24710 5315030011 TANGGE NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 120.15105 -8.72340 24711 5315030012 SIRU NUSA TENGGARA TIMUR 136 Pre-Electrified - - - 120.14516 -8.71041 24712 5315030012 SIRU NUSA TENGGARA TIMUR 445 Pre-Electrified - - - 120.13684 -8.68712 24713 5315030012 SIRU NUSA TENGGARA TIMUR 173 Pre-Electrified - - - 120.15225 -8.67933 24714 5315030012 SIRU NUSA TENGGARA TIMUR 243 Pre-Electrified - - - 120.13890 -8.69751 24715 5315030012 SIRU NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 120.14225 -8.70991 24716 5315030012 SIRU NUSA TENGGARA TIMUR 46 Pre-Electrified - - - 120.14516 -8.68419 24717 5315030012 SIRU NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 120.14762 -8.69512 24718 5315030012 SIRU NUSA TENGGARA TIMUR 38 Pre-Electrified - - - 120.14434 -8.69670 24719 5315030012 SIRU NUSA TENGGARA TIMUR 26 Pre-Electrified - - - 120.13419 -8.68852 24720 5315030012 SIRU NUSA TENGGARA TIMUR 67 Pre-Electrified - - - 120.16200 -8.70692 24721 5315030014 POCO RUTANG NUSA TENGGARA TIMUR 1 392 Pre-Electrified - - - 120.17765 -8.70560 24722 5315030014 POCO RUTANG NUSA TENGGARA TIMUR 12 Pre-Electrified - - - 120.17190 -8.71014 24723 5315030014 POCO RUTANG NUSA TENGGARA TIMUR 87 Pre-Electrified - - - 120.17601 -8.71401 24724 5315030014 POCO RUTANG NUSA TENGGARA TIMUR 68 MiniGrid Systems 13 11 037 2.4 120.17576 -8.68951 24725 5315030014 POCO RUTANG NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 120.17852 -8.71144 24726 5315030014 POCO RUTANG NUSA TENGGARA TIMUR 56 Pre-Electrified - - - 120.17936 -8.71209 24727 5315030014 POCO RUTANG NUSA TENGGARA TIMUR 55 Pre-Electrified - - - 120.18310 -8.69929 24728 5315030014 POCO RUTANG NUSA TENGGARA TIMUR 351 Pre-Electrified - - - 120.17137 -8.70821 24729 5315030014 POCO RUTANG NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 120.18233 -8.70823 24730 5315030014 POCO RUTANG NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 120.18748 -8.70244 24731 5315030015 DALENG NUSA TENGGARA TIMUR 613 Pre-Electrified - - - 120.20373 -8.69628 24732 5315030015 DALENG NUSA TENGGARA TIMUR 345 Pre-Electrified - - - 120.22489 -8.68934 24733 5315030015 DALENG NUSA TENGGARA TIMUR 274 Pre-Electrified - - - 120.24019 -8.68892 24734 5315030015 DALENG NUSA TENGGARA TIMUR 246 Pre-Electrified - - - 120.23318 -8.68812 24735 5315030015 DALENG NUSA TENGGARA TIMUR 330 Pre-Electrified - - - 120.21609 -8.68419 24736 5315030015 DALENG NUSA TENGGARA TIMUR 257 Pre-Electrified - - - 120.21160 -8.68520 24737 5315030015 DALENG NUSA TENGGARA TIMUR 112 Pre-Electrified - - - 120.21949 -8.69103 24738 5315030015 DALENG NUSA TENGGARA TIMUR 124 Pre-Electrified - - - 120.21264 -8.68743 24739 5315030015 DALENG NUSA TENGGARA TIMUR 192 Pre-Electrified - - - 120.23595 -8.68780 24740 5315030015 DALENG NUSA TENGGARA TIMUR 383 Pre-Electrified - - - 120.20828 -8.69577 24741 5315030015 DALENG NUSA TENGGARA TIMUR 135 Pre-Electrified - - - 120.21237 -8.69335 24742 5315030016 PONG MAJOK NUSA TENGGARA TIMUR 247 Pre-Electrified - - - 120.23082 -8.68108 24743 5315030016 PONG MAJOK NUSA TENGGARA TIMUR 546 Pre-Electrified - - - 120.23545 -8.68046 24744 5315030016 PONG MAJOK NUSA TENGGARA TIMUR 334 Pre-Electrified - - - 120.24699 -8.68456 24745 5315030016 PONG MAJOK NUSA TENGGARA TIMUR 423 Pre-Electrified - - - 120.24236 -8.68062 24746 5315030016 PONG MAJOK NUSA TENGGARA TIMUR 539 Pre-Electrified - - - 120.26397 -8.68658 24747 5315030016 PONG MAJOK NUSA TENGGARA TIMUR 540 Pre-Electrified - - - 120.25689 -8.68939 24748 5315030018 PONTO ARA NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 120.25807 -8.69645 24749 5315030018 PONTO ARA NUSA TENGGARA TIMUR 81 Pre-Electrified - - - 120.26147 -8.69751 24750 5315031007 GOLO RONGGOT NUSA TENGGARA TIMUR 1 396 Pre-Electrified - - - 120.13761 -8.66385 24751 5315031007 GOLO RONGGOT NUSA TENGGARA TIMUR 238 Pre-Electrified - - - 120.15148 -8.67177 24752 5315040002 RANGGU NUSA TENGGARA TIMUR - Pre-Electrified - - - 120.26094 -8.58347 24753 5315040003 GOLO RUU NUSA TENGGARA TIMUR 1 387 Pre-Electrified - - - 120.27108 -8.58187 24754 5315040003 GOLO RUU NUSA TENGGARA TIMUR 228 Pre-Electrified - - - 120.27198 -8.58512 24755 5315040003 GOLO RUU NUSA TENGGARA TIMUR 17 Pre-Electrified - - - 120.26264 -8.58402 24756 5315040003 GOLO RUU NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 120.26161 -8.58357 24757 5315040004 BENTENG CURU NUSA TENGGARA TIMUR 577 Pre-Electrified - - - 120.26680 -8.59405 24758 5315040004 BENTENG CURU NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 120.27206 -8.58599 24759 5315040004 BENTENG CURU NUSA TENGGARA TIMUR 356 Pre-Electrified - - - 120.27186 -8.59006 24760 5315040004 BENTENG CURU NUSA TENGGARA TIMUR 141 Pre-Electrified - - - 120.26424 -8.58622 24761 5315040004 BENTENG CURU NUSA TENGGARA TIMUR 150 Pre-Electrified - - - 120.26331 -8.58818 24762 5315040004 BENTENG CURU NUSA TENGGARA TIMUR 103 Pre-Electrified - - - 120.26246 -8.58438 24763 5315040004 BENTENG CURU NUSA TENGGARA TIMUR 20 Pre-Electrified - - - 120.26125 -8.58366 24764 5315040005 COMPANG SUKA NUSA TENGGARA TIMUR 246 Pre-Electrified - - - 120.28079 -8.56517 24765 5315040005 COMPANG SUKA NUSA TENGGARA TIMUR 74 Pre-Electrified - - - 120.28079 -8.55863 24766 5315040005 COMPANG SUKA NUSA TENGGARA TIMUR 87 Pre-Electrified - - - 120.27197 -8.56499 24767 5315040005 COMPANG SUKA NUSA TENGGARA TIMUR 43 Pre-Electrified - - - 120.27599 -8.56441 24768 5315040006 NANTAL NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 120.31862 -8.57058 24769 5315040006 NANTAL NUSA TENGGARA TIMUR 865 Pre-Electrified - - - 120.30648 -8.57103 24770 5315040006 NANTAL NUSA TENGGARA TIMUR 388 Pre-Electrified - - - 120.31667 -8.56720 24771 5315040006 NANTAL NUSA TENGGARA TIMUR 694 Pre-Electrified - - - 120.31362 -8.56649 24772 5315040006 NANTAL NUSA TENGGARA TIMUR 118 Pre-Electrified - - - 120.31130 -8.56831 24773 5315040007 COAL NUSA TENGGARA TIMUR 334 Pre-Electrified - - - 120.33226 -8.54801 24774 5315040007 COAL NUSA TENGGARA TIMUR 487 Pre-Electrified - - - 120.32954 -8.55392 24775 5315040007 COAL NUSA TENGGARA TIMUR 170 Pre-Electrified - - - 120.32025 -8.56142 24776 5315040007 COAL NUSA TENGGARA TIMUR 180 Pre-Electrified - - - 120.32364 -8.56373 24777 5315040009 LEWUR NUSA TENGGARA TIMUR 1 146 Pre-Electrified - - - 120.33807 -8.55859 24778 5315040009 LEWUR NUSA TENGGARA TIMUR 238 Pre-Electrified - - - 120.34140 -8.55992 24779 5315040009 LEWUR NUSA TENGGARA TIMUR 151 Pre-Electrified - - - 120.34532 -8.56541 24780 5315040017 KOLANG NUSA TENGGARA TIMUR - Pre-Electrified - - - 120.25000 -8.56352 24781 5315050001 LOHA NUSA TENGGARA TIMUR 81 MiniGrid Systems 19 16 131 3.5 120.14378 -8.50276 24782 5315050010 BARI NUSA TENGGARA TIMUR 111 MiniGrid Systems 22 18 678 4.0 120.19128 -8.32510 24783 5316010008 ANAKALANG NUSA TENGGARA TIMUR 158 Pre-Electrified - - - 119.58076 -9.59610 24784 5316010008 ANAKALANG NUSA TENGGARA TIMUR 114 Pre-Electrified - - - 119.57199 -9.58569 24785 5316010008 ANAKALANG NUSA TENGGARA TIMUR 119 Pre-Electrified - - - 119.58005 -9.59263 24786 5316010008 ANAKALANG NUSA TENGGARA TIMUR 2 777 Pre-Electrified - - - 119.57420 -9.59097 24787 5316010008 ANAKALANG NUSA TENGGARA TIMUR 61 Pre-Electrified - - - 119.57112 -9.58123 24788 5316010009 MAKATA KERI NUSA TENGGARA TIMUR 12 Pre-Electrified - - - 119.57166 -9.59810 24789 5316010010 UMBU RIRI NUSA TENGGARA TIMUR 712 Pre-Electrified - - - 119.49595 -9.61622 Annex II – Demand forecast results Page 174 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 24790 5316010010 UMBU RIRI NUSA TENGGARA TIMUR 586 Pre-Electrified - - - 119.52608 -9.61063 24791 5316010011 MATA WOGA NUSA TENGGARA TIMUR 650 Pre-Electrified - - - 119.54242 -9.59764 24792 5316010011 MATA WOGA NUSA TENGGARA TIMUR 885 Pre-Electrified - - - 119.54528 -9.59839 24793 5316010011 MATA WOGA NUSA TENGGARA TIMUR 401 Pre-Electrified - - - 119.54057 -9.59926 24794 5316010011 MATA WOGA NUSA TENGGARA TIMUR 99 Pre-Electrified - - - 119.54742 -9.59776 24795 5316010012 KABELA WUNTU NUSA TENGGARA TIMUR 1 176 Pre-Electrified - - - 119.56017 -9.60136 24796 5316020004 WAI RASA NUSA TENGGARA TIMUR 558 Pre-Electrified - - - 119.58745 -9.59713 24797 5316020004 WAI RASA NUSA TENGGARA TIMUR 766 Pre-Electrified - - - 119.59908 -9.60338 24798 5316020004 WAI RASA NUSA TENGGARA TIMUR 885 Pre-Electrified - - - 119.59447 -9.60010 24799 5316020006 ANAJIAKA NUSA TENGGARA TIMUR 597 Pre-Electrified - - - 119.58152 -9.58808 24800 5316020006 ANAJIAKA NUSA TENGGARA TIMUR 664 Pre-Electrified - - - 119.58159 -9.59255 24801 5316040005 WENDEWA SELATAN NUSA TENGGARA TIMUR 177 MiniGrid Systems 10 7 030 1.5 119.52056 -9.40517 24802 5316040006 WENDEWA UTARA NUSA TENGGARA TIMUR 214 Pre-Electrified - - - 119.54250 -9.38232 24803 5317010008 WALLA NDIMU NUSA TENGGARA TIMUR 353 Pre-Electrified - - - 119.04450 -9.62482 24804 5317020001 KAPAKA MADETA NUSA TENGGARA TIMUR 1 940 Pre-Electrified - - - 119.00741 -9.55859 24805 5317020002 KOKI NUSA TENGGARA TIMUR 836 Pre-Electrified - - - 118.99446 -9.57651 24806 5317020002 KOKI NUSA TENGGARA TIMUR 727 Pre-Electrified - - - 118.99519 -9.56924 24807 5317020002 KOKI NUSA TENGGARA TIMUR 364 Pre-Electrified - - - 119.00225 -9.57681 24808 5317020002 KOKI NUSA TENGGARA TIMUR 227 Pre-Electrified - - - 119.00470 -9.57464 24809 5317020003 HAMONGGO LELE NUSA TENGGARA TIMUR 16 Pre-Electrified - - - 118.99476 -9.57717 24810 5317020003 HAMONGGO LELE NUSA TENGGARA TIMUR 2 118 Pre-Electrified - - - 118.99542 -9.58065 24811 5317020004 BONDO KODI NUSA TENGGARA TIMUR 2 107 Pre-Electrified - - - 118.99384 -9.59432 24812 5317020010 MALI IHA NUSA TENGGARA TIMUR 1 343 Pre-Electrified - - - 119.02531 -9.55134 24813 5317020010 MALI IHA NUSA TENGGARA TIMUR 1 278 Pre-Electrified - - - 119.02209 -9.55150 24814 5317030001 HOHA WUNGO NUSA TENGGARA TIMUR 2 637 Pre-Electrified - - - 119.02867 -9.53694 24815 5317030002 HOMBA KARIPIT NUSA TENGGARA TIMUR 1 746 Pre-Electrified - - - 119.03100 -9.52016 24816 5317030002 HOMBA KARIPIT NUSA TENGGARA TIMUR 813 Pre-Electrified - - - 119.03424 -9.51317 24817 5317030002 HOMBA KARIPIT NUSA TENGGARA TIMUR 174 Pre-Electrified - - - 119.02297 -9.51894 24818 5317030002 HOMBA KARIPIT NUSA TENGGARA TIMUR 863 Pre-Electrified - - - 119.02850 -9.52404 24819 5317030006 KORI NUSA TENGGARA TIMUR 835 Pre-Electrified - - - 119.03730 -9.50296 24820 5317030006 KORI NUSA TENGGARA TIMUR 658 Pre-Electrified - - - 119.03981 -9.50575 24821 5317030006 KORI NUSA TENGGARA TIMUR 2 039 Pre-Electrified - - - 119.03486 -9.50794 24822 5317030006 KORI NUSA TENGGARA TIMUR 356 Pre-Electrified - - - 119.02779 -9.50752 24823 5317030006 KORI NUSA TENGGARA TIMUR 491 Pre-Electrified - - - 119.03503 -9.50963 24824 5317030006 KORI NUSA TENGGARA TIMUR 1 006 Pre-Electrified - - - 119.03902 -9.49897 24825 5317030008 MANGGA NIPI NUSA TENGGARA TIMUR 1 243 Pre-Electrified - - - 119.04518 -9.48052 24826 5317030008 MANGGA NIPI NUSA TENGGARA TIMUR 847 Pre-Electrified - - - 119.03372 -9.48528 24827 5317030008 MANGGA NIPI NUSA TENGGARA TIMUR 788 Pre-Electrified - - - 119.04167 -9.49163 24828 5317030008 MANGGA NIPI NUSA TENGGARA TIMUR 266 Pre-Electrified - - - 119.03434 -9.48353 24829 5317030008 MANGGA NIPI NUSA TENGGARA TIMUR 329 Pre-Electrified - - - 119.04705 -9.48214 24830 5317030008 MANGGA NIPI NUSA TENGGARA TIMUR 635 Pre-Electrified - - - 119.04264 -9.48825 24831 5317030009 KENDU WELA NUSA TENGGARA TIMUR 1 070 Pre-Electrified - - - 119.04711 -9.47727 24832 5317030009 KENDU WELA NUSA TENGGARA TIMUR 497 Pre-Electrified - - - 119.04142 -9.46404 24833 5317030009 KENDU WELA NUSA TENGGARA TIMUR 319 Pre-Electrified - - - 119.04403 -9.47220 24834 5317030010 BILA CENGE NUSA TENGGARA TIMUR 416 Pre-Electrified - - - 119.06056 -9.45391 24835 5317030010 BILA CENGE NUSA TENGGARA TIMUR 373 Pre-Electrified - - - 119.04726 -9.46503 24836 5317030010 BILA CENGE NUSA TENGGARA TIMUR 1 273 Pre-Electrified - - - 119.06992 -9.45777 24837 5317030010 BILA CENGE NUSA TENGGARA TIMUR 402 Pre-Electrified - - - 119.05991 -9.45890 24838 5317030010 BILA CENGE NUSA TENGGARA TIMUR 305 Pre-Electrified - - - 119.04549 -9.46340 24839 5317030010 BILA CENGE NUSA TENGGARA TIMUR 238 Pre-Electrified - - - 119.07557 -9.45400 24840 5317030010 BILA CENGE NUSA TENGGARA TIMUR 574 Pre-Electrified - - - 119.07417 -9.45969 24841 5317030010 BILA CENGE NUSA TENGGARA TIMUR 347 Pre-Electrified - - - 119.06171 -9.45833 24842 5317030011 BUKAMBERO NUSA TENGGARA TIMUR 319 Pre-Electrified - - - 119.08283 -9.45767 24843 5317030011 BUKAMBERO NUSA TENGGARA TIMUR 102 Pre-Electrified - - - 119.08900 -9.45685 24844 5317030011 BUKAMBERO NUSA TENGGARA TIMUR 131 Pre-Electrified - - - 119.09815 -9.45210 24845 5317030011 BUKAMBERO NUSA TENGGARA TIMUR 303 Pre-Electrified - - - 119.09078 -9.46132 24846 5317030011 BUKAMBERO NUSA TENGGARA TIMUR 212 Pre-Electrified - - - 119.08161 -9.46438 24847 5317030011 BUKAMBERO NUSA TENGGARA TIMUR 429 Pre-Electrified - - - 119.09348 -9.45663 24848 5317030011 BUKAMBERO NUSA TENGGARA TIMUR 434 Pre-Electrified - - - 119.10109 -9.45133 24849 5317030011 BUKAMBERO NUSA TENGGARA TIMUR 446 Pre-Electrified - - - 119.07854 -9.44994 24850 5317030011 BUKAMBERO NUSA TENGGARA TIMUR 833 Pre-Electrified - - - 119.10326 -9.45052 24851 5317030011 BUKAMBERO NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 119.07621 -9.45383 24852 5317030011 BUKAMBERO NUSA TENGGARA TIMUR 211 Pre-Electrified - - - 119.09596 -9.45405 24853 5317030012 KALEMBU KAHA NUSA TENGGARA TIMUR 1 004 Pre-Electrified - - - 119.11874 -9.44481 24854 5317030012 KALEMBU KAHA NUSA TENGGARA TIMUR 478 Pre-Electrified - - - 119.12405 -9.44231 24855 5317030012 KALEMBU KAHA NUSA TENGGARA TIMUR 270 Pre-Electrified - - - 119.12232 -9.45021 24856 5317030012 KALEMBU KAHA NUSA TENGGARA TIMUR 708 Pre-Electrified - - - 119.13729 -9.43860 24857 5317030012 KALEMBU KAHA NUSA TENGGARA TIMUR 602 Pre-Electrified - - - 119.13568 -9.43565 24858 5317030012 KALEMBU KAHA NUSA TENGGARA TIMUR 489 Pre-Electrified - - - 119.12557 -9.44278 24859 5317030012 KALEMBU KAHA NUSA TENGGARA TIMUR 261 Pre-Electrified - - - 119.13066 -9.44604 24860 5317030012 KALEMBU KAHA NUSA TENGGARA TIMUR 279 Pre-Electrified - - - 119.14861 -9.43631 24861 5317030012 KALEMBU KAHA NUSA TENGGARA TIMUR 363 Pre-Electrified - - - 119.14575 -9.43148 24862 5317030012 KALEMBU KAHA NUSA TENGGARA TIMUR 194 Pre-Electrified - - - 119.15133 -9.43530 24863 5317040006 BONDO UKKA NUSA TENGGARA TIMUR 1 OffGrid Systems 1 703 0.2 119.19088 -9.55718 24864 5317040008 WERI LOLO NUSA TENGGARA TIMUR 629 Pre-Electrified - - - 119.15497 -9.54486 24865 5317040008 WERI LOLO NUSA TENGGARA TIMUR 590 Pre-Electrified - - - 119.14496 -9.53634 24866 5317050005 WALI ATE NUSA TENGGARA TIMUR 748 Pre-Electrified - - - 119.17526 -9.53562 24867 5317050005 WALI ATE NUSA TENGGARA TIMUR 508 Pre-Electrified - - - 119.16868 -9.53171 24868 5317050005 WALI ATE NUSA TENGGARA TIMUR 941 Pre-Electrified - - - 119.17134 -9.53015 24869 5317050006 KALEMBU WERI NUSA TENGGARA TIMUR 198 Pre-Electrified - - - 119.19314 -9.52633 24870 5317050006 KALEMBU WERI NUSA TENGGARA TIMUR 1 214 Pre-Electrified - - - 119.17924 -9.52411 24871 5317050006 KALEMBU WERI NUSA TENGGARA TIMUR 303 Pre-Electrified - - - 119.20223 -9.51577 24872 5317050006 KALEMBU WERI NUSA TENGGARA TIMUR 256 Pre-Electrified - - - 119.18997 -9.52825 24873 5317050006 KALEMBU WERI NUSA TENGGARA TIMUR 422 Pre-Electrified - - - 119.19383 -9.51782 24874 5317050006 KALEMBU WERI NUSA TENGGARA TIMUR 169 Pre-Electrified - - - 119.19701 -9.52154 Annex II – Demand forecast results Page 175 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 24875 5317050006 KALEMBU WERI NUSA TENGGARA TIMUR 188 Pre-Electrified - - - 119.19187 -9.51512 24876 5317050007 KABALI DANA NUSA TENGGARA TIMUR 484 Pre-Electrified - - - 119.21242 -9.51127 24877 5317050007 KABALI DANA NUSA TENGGARA TIMUR 400 Pre-Electrified - - - 119.21186 -9.51035 24878 5317050009 WAIMANGURA NUSA TENGGARA TIMUR 115 Pre-Electrified - - - 119.22521 -9.50044 24879 5317050009 WAIMANGURA NUSA TENGGARA TIMUR 90 Pre-Electrified - - - 119.22817 -9.50404 24880 5317050009 WAIMANGURA NUSA TENGGARA TIMUR 95 Pre-Electrified - - - 119.23946 -9.51095 24881 5317050009 WAIMANGURA NUSA TENGGARA TIMUR 366 Pre-Electrified - - - 119.24048 -9.50999 24882 5317050009 WAIMANGURA NUSA TENGGARA TIMUR 230 Pre-Electrified - - - 119.24740 -9.51329 24883 5317050009 WAIMANGURA NUSA TENGGARA TIMUR 762 Pre-Electrified - - - 119.24618 -9.51762 24884 5317050009 WAIMANGURA NUSA TENGGARA TIMUR 296 Pre-Electrified - - - 119.23456 -9.51056 24885 5317050009 WAIMANGURA NUSA TENGGARA TIMUR 145 Pre-Electrified - - - 119.23768 -9.50999 24886 5317050009 WAIMANGURA NUSA TENGGARA TIMUR 211 Pre-Electrified - - - 119.22666 -9.50250 24887 5317050009 WAIMANGURA NUSA TENGGARA TIMUR 179 Pre-Electrified - - - 119.23494 -9.50712 24888 5317050009 WAIMANGURA NUSA TENGGARA TIMUR 468 Pre-Electrified - - - 119.24388 -9.51368 24889 5317050009 WAIMANGURA NUSA TENGGARA TIMUR 496 Pre-Electrified - - - 119.23560 -9.50868 24890 5317050009 WAIMANGURA NUSA TENGGARA TIMUR 273 Pre-Electrified - - - 119.23000 -9.50591 24891 5317050009 WAIMANGURA NUSA TENGGARA TIMUR 11 Pre-Electrified - - - 119.22528 -9.49995 24892 5317050009 WAIMANGURA NUSA TENGGARA TIMUR 189 Pre-Electrified - - - 119.22189 -9.49753 24893 5317050010 WEE RENNA NUSA TENGGARA TIMUR 806 Pre-Electrified - - - 119.22447 -9.45824 24894 5317050010 WEE RENNA NUSA TENGGARA TIMUR 822 Pre-Electrified - - - 119.21164 -9.46504 24895 5317050010 WEE RENNA NUSA TENGGARA TIMUR 1 307 Pre-Electrified - - - 119.22844 -9.45081 24896 5317050010 WEE RENNA NUSA TENGGARA TIMUR 519 Pre-Electrified - - - 119.22694 -9.45406 24897 5317050012 MAROKOTA NUSA TENGGARA TIMUR 135 Pre-Electrified - - - 119.16452 -9.50015 24898 5317050013 WATU KAWULA NUSA TENGGARA TIMUR 513 Pre-Electrified - - - 119.18679 -9.43497 24899 5317050013 WATU KAWULA NUSA TENGGARA TIMUR 231 Pre-Electrified - - - 119.14929 -9.42833 24900 5317050013 WATU KAWULA NUSA TENGGARA TIMUR 364 Pre-Electrified - - - 119.16521 -9.42663 24901 5317050013 WATU KAWULA NUSA TENGGARA TIMUR 403 Pre-Electrified - - - 119.19474 -9.43599 24902 5317050013 WATU KAWULA NUSA TENGGARA TIMUR 543 Pre-Electrified - - - 119.19645 -9.44363 24903 5317050013 WATU KAWULA NUSA TENGGARA TIMUR 161 Pre-Electrified - - - 119.17660 -9.43336 24904 5317060006 OMBA RADE NUSA TENGGARA TIMUR 2 895 Pre-Electrified - - - 119.30902 -9.56330 24905 5317060007 KALEMBU NDARA MANE NUSA TENGGARA TIMUR 774 Pre-Electrified - - - 119.32889 -9.58366 24906 5317060007 KALEMBU NDARA MANE NUSA TENGGARA TIMUR 93 Pre-Electrified - - - 119.32585 -9.58050 24907 5317060007 KALEMBU NDARA MANE NUSA TENGGARA TIMUR 4 187 Pre-Electrified - - - 119.31750 -9.56896 24908 5317060007 KALEMBU NDARA MANE NUSA TENGGARA TIMUR 949 Pre-Electrified - - - 119.32006 -9.57322 24909 5317060010 WEE KOKORA NUSA TENGGARA TIMUR 1 978 Pre-Electrified - - - 119.28490 -9.52882 24910 5317060012 LOMBU NUSA TENGGARA TIMUR 966 Pre-Electrified - - - 119.28451 -9.52784 24911 5317060012 LOMBU NUSA TENGGARA TIMUR 2 229 Pre-Electrified - - - 119.27657 -9.51872 24912 5317060012 LOMBU NUSA TENGGARA TIMUR 1 510 Pre-Electrified - - - 119.28919 -9.52988 24913 5317060014 TANGGABA NUSA TENGGARA TIMUR 1 830 Pre-Electrified - - - 119.30622 -9.54583 24914 5317060015 WEE PATANDO NUSA TENGGARA TIMUR 1 509 Pre-Electrified - - - 119.30952 -9.54724 24915 5317060016 BOLORA NUSA TENGGARA TIMUR 2 170 Pre-Electrified - - - 119.34700 -9.54539 24916 5317060017 WEELIMBU NUSA TENGGARA TIMUR 1 806 Pre-Electrified - - - 119.33695 -9.56234 24917 5317060017 WEELIMBU NUSA TENGGARA TIMUR 840 Pre-Electrified - - - 119.34111 -9.56318 24918 5317060017 WEELIMBU NUSA TENGGARA TIMUR 748 Pre-Electrified - - - 119.32827 -9.56151 24919 5317070002 WEE PABOBA NUSA TENGGARA TIMUR 2 565 Pre-Electrified - - - 119.35509 -9.52686 24920 5317070002 WEE PABOBA NUSA TENGGARA TIMUR 314 Pre-Electrified - - - 119.35914 -9.52766 24921 5317070003 MATALOKO NUSA TENGGARA TIMUR 1 697 Pre-Electrified - - - 119.35745 -9.53964 24922 5317070004 PUU POTTO NUSA TENGGARA TIMUR 1 933 Pre-Electrified - - - 119.35203 -9.52782 24923 5317080001 WEE LONDA NUSA TENGGARA TIMUR 502 Pre-Electrified - - - 119.19987 -9.43169 24924 5317080001 WEE LONDA NUSA TENGGARA TIMUR 199 Pre-Electrified - - - 119.21183 -9.42858 24925 5317080001 WEE LONDA NUSA TENGGARA TIMUR 435 Pre-Electrified - - - 119.20316 -9.43918 24926 5317080001 WEE LONDA NUSA TENGGARA TIMUR 900 Pre-Electrified - - - 119.19848 -9.43685 24927 5317080001 WEE LONDA NUSA TENGGARA TIMUR 158 Pre-Electrified - - - 119.20140 -9.44556 24928 5317080001 WEE LONDA NUSA TENGGARA TIMUR 371 Pre-Electrified - - - 119.21370 -9.43793 24929 5317080001 WEE LONDA NUSA TENGGARA TIMUR 6 Pre-Electrified - - - 119.19590 -9.43624 24930 5317080001 WEE LONDA NUSA TENGGARA TIMUR 242 Pre-Electrified - - - 119.19718 -9.44420 24931 5317080002 LANGGA LERO NUSA TENGGARA TIMUR 3 580 Pre-Electrified - - - 119.22741 -9.44184 24932 5317080002 LANGGA LERO NUSA TENGGARA TIMUR 256 Pre-Electrified - - - 119.23038 -9.43521 24933 5317080003 WEE TOBULA NUSA TENGGARA TIMUR 225 Pre-Electrified - - - 119.23358 -9.44576 24934 5317080003 WEE TOBULA NUSA TENGGARA TIMUR 3 737 Pre-Electrified - - - 119.23205 -9.44284 24935 5317080003 WEE TOBULA NUSA TENGGARA TIMUR 226 Pre-Electrified - - - 119.22614 -9.44687 24936 5317080003 WEE TOBULA NUSA TENGGARA TIMUR 154 Pre-Electrified - - - 119.23951 -9.43993 24937 5317080004 KALENA WANO NUSA TENGGARA TIMUR 1 990 Pre-Electrified - - - 119.24397 -9.42677 24938 5317080005 RADAMATA NUSA TENGGARA TIMUR 158 Pre-Electrified - - - 119.23789 -9.42820 24939 5317080005 RADAMATA NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 119.23542 -9.43120 24940 5317080005 RADAMATA NUSA TENGGARA TIMUR 928 Pre-Electrified - - - 119.24398 -9.42079 24941 5317080005 RADAMATA NUSA TENGGARA TIMUR 2 225 Pre-Electrified - - - 119.24344 -9.42643 24942 5317080005 RADAMATA NUSA TENGGARA TIMUR 201 Pre-Electrified - - - 119.24602 -9.42238 24943 5317080005 RADAMATA NUSA TENGGARA TIMUR 332 Pre-Electrified - - - 119.23987 -9.42530 24944 5317080005 RADAMATA NUSA TENGGARA TIMUR 115 Pre-Electrified - - - 119.25113 -9.41347 24945 5317080005 RADAMATA NUSA TENGGARA TIMUR 98 Pre-Electrified - - - 119.25120 -9.42214 24946 5317080006 WEE PANGALI NUSA TENGGARA TIMUR 745 Pre-Electrified - - - 119.25265 -9.42403 24947 5317080006 WEE PANGALI NUSA TENGGARA TIMUR 1 187 Pre-Electrified - - - 119.25307 -9.42160 24948 5317080007 RAMMA DANA NUSA TENGGARA TIMUR 2 004 Pre-Electrified - - - 119.28908 -9.41618 24949 5318010001 AEWOE NUSA TENGGARA TIMUR 873 Pre-Electrified - - - 121.14230 -8.89701 24950 5318010003 WOLOKISA NUSA TENGGARA TIMUR 263 Pre-Electrified - - - 121.14823 -8.89554 24951 5318010004 WULIWALO NUSA TENGGARA TIMUR 178 Pre-Electrified - - - 121.16623 -8.88022 24952 5318010005 MAUKELI NUSA TENGGARA TIMUR 470 Pre-Electrified - - - 121.16227 -8.89380 24953 5318010005 MAUKELI NUSA TENGGARA TIMUR 150 Pre-Electrified - - - 121.16433 -8.89283 24954 5318010005 MAUKELI NUSA TENGGARA TIMUR 81 Pre-Electrified - - - 121.16952 -8.88787 24955 5318010005 MAUKELI NUSA TENGGARA TIMUR 69 Pre-Electrified - - - 121.17638 -8.88637 24956 5318010005 MAUKELI NUSA TENGGARA TIMUR 55 Pre-Electrified - - - 121.16719 -8.89074 24957 5318010005 MAUKELI NUSA TENGGARA TIMUR 44 Pre-Electrified - - - 121.17437 -8.88640 24958 5318010005 MAUKELI NUSA TENGGARA TIMUR 16 Pre-Electrified - - - 121.15368 -8.89336 24959 5318010006 LOKALABA NUSA TENGGARA TIMUR 449 Pre-Electrified - - - 121.19195 -8.89100 Annex II – Demand forecast results Page 176 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 24960 5318010006 LOKALABA NUSA TENGGARA TIMUR 146 Pre-Electrified - - - 121.18842 -8.87733 24961 5318010006 LOKALABA NUSA TENGGARA TIMUR 106 Pre-Electrified - - - 121.19484 -8.88255 24962 5318010006 LOKALABA NUSA TENGGARA TIMUR 109 Pre-Electrified - - - 121.18195 -8.88477 24963 5318010006 LOKALABA NUSA TENGGARA TIMUR 47 Pre-Electrified - - - 121.18356 -8.88484 24964 5318010007 WOLOTELU NUSA TENGGARA TIMUR 532 Pre-Electrified - - - 121.19651 -8.89308 24965 5318010007 WOLOTELU NUSA TENGGARA TIMUR 102 Pre-Electrified - - - 121.20256 -8.88448 24966 5318010007 WOLOTELU NUSA TENGGARA TIMUR 92 Pre-Electrified - - - 121.20032 -8.88679 24967 5318010007 WOLOTELU NUSA TENGGARA TIMUR 70 Pre-Electrified - - - 121.20454 -8.88022 24968 5318010008 MAUPONGGO NUSA TENGGARA TIMUR 149 Pre-Electrified - - - 121.21272 -8.88176 24969 5318010008 MAUPONGGO NUSA TENGGARA TIMUR 6 Pre-Electrified - - - 121.21122 -8.87791 24970 5318010008 MAUPONGGO NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 121.21127 -8.87969 24971 5318010008 MAUPONGGO NUSA TENGGARA TIMUR 1 013 Pre-Electrified - - - 121.21150 -8.88936 24972 5318010008 MAUPONGGO NUSA TENGGARA TIMUR 49 Pre-Electrified - - - 121.20479 -8.88028 24973 5318010009 SAWU NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 121.21099 -8.87747 24974 5318010009 SAWU NUSA TENGGARA TIMUR 406 Pre-Electrified - - - 121.20419 -8.86752 24975 5318010009 SAWU NUSA TENGGARA TIMUR 329 Pre-Electrified - - - 121.20359 -8.86550 24976 5318010009 SAWU NUSA TENGGARA TIMUR 288 Pre-Electrified - - - 121.20891 -8.86429 24977 5318010009 SAWU NUSA TENGGARA TIMUR 162 Pre-Electrified - - - 121.21046 -8.86200 24978 5318010009 SAWU NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 121.20299 -8.86769 24979 5318010010 JAWAPOGO NUSA TENGGARA TIMUR 557 Pre-Electrified - - - 121.19285 -8.86262 24980 5318010010 JAWAPOGO NUSA TENGGARA TIMUR 518 Pre-Electrified - - - 121.19298 -8.85646 24981 5318010010 JAWAPOGO NUSA TENGGARA TIMUR 233 Pre-Electrified - - - 121.19208 -8.85127 24982 5318010011 LAJAWAJO NUSA TENGGARA TIMUR 506 Pre-Electrified - - - 121.17015 -8.83769 24983 5318010011 LAJAWAJO NUSA TENGGARA TIMUR 370 Pre-Electrified - - - 121.18030 -8.84717 24984 5318010011 LAJAWAJO NUSA TENGGARA TIMUR 248 Pre-Electrified - - - 121.17479 -8.84023 24985 5318010012 ULULOGA NUSA TENGGARA TIMUR 389 Pre-Electrified - - - 121.19580 -8.84527 24986 5318010012 ULULOGA NUSA TENGGARA TIMUR 73 Pre-Electrified - - - 121.19311 -8.84059 24987 5318010013 LODAOLO NUSA TENGGARA TIMUR 639 Pre-Electrified - - - 121.20412 -8.84615 24988 5318010013 LODAOLO NUSA TENGGARA TIMUR 97 Pre-Electrified - - - 121.20670 -8.84457 24989 5318010013 LODAOLO NUSA TENGGARA TIMUR 169 Pre-Electrified - - - 121.20183 -8.84787 24990 5318010013 LODAOLO NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 121.20559 -8.84386 24991 5318010014 WOLOEDE NUSA TENGGARA TIMUR 105 Pre-Electrified - - - 121.20810 -8.84104 24992 5318010017 UA NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 121.21659 -8.87514 24993 5318010017 UA NUSA TENGGARA TIMUR 356 Pre-Electrified - - - 121.21764 -8.86744 24994 5318010017 UA NUSA TENGGARA TIMUR 235 Pre-Electrified - - - 121.21705 -8.87458 24995 5318010018 KELIWATULEWA NUSA TENGGARA TIMUR 230 Pre-Electrified - - - 121.21714 -8.89068 24996 5318030008 DEGALEA NUSA TENGGARA TIMUR 23 MiniGrid Systems 6 5 094 1.1 121.29685 -8.80809 24997 5318030009 KOTAKEO NUSA TENGGARA TIMUR 413 Pre-Electrified - - - 121.27474 -8.81459 24998 5318030009 KOTAKEO NUSA TENGGARA TIMUR 304 Pre-Electrified - - - 121.27233 -8.81139 24999 5318030009 KOTAKEO NUSA TENGGARA TIMUR 233 Pre-Electrified - - - 121.27755 -8.81950 25000 5318030009 KOTAKEO NUSA TENGGARA TIMUR 79 Pre-Electrified - - - 121.28051 -8.81813 25001 5318030009 KOTAKEO NUSA TENGGARA TIMUR 63 MiniGrid Systems 15 12 735 2.7 121.28695 -8.81649 25002 5318030009 KOTAKEO NUSA TENGGARA TIMUR 59 MiniGrid Systems 15 12 735 2.7 121.29426 -8.78249 25003 5318030009 KOTAKEO NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 121.28218 -8.81798 25004 5318030009 KOTAKEO NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 121.27590 -8.81805 25005 5318030009 KOTAKEO NUSA TENGGARA TIMUR 20 Pre-Electrified - - - 121.26497 -8.81155 25006 5318030009 KOTAKEO NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 121.26558 -8.81076 25007 5318030009 KOTAKEO NUSA TENGGARA TIMUR 71 Pre-Electrified - - - 121.27099 -8.80921 25008 5318030010 PAGOMOGO NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 121.29526 -8.75431 25009 5318030010 PAGOMOGO NUSA TENGGARA TIMUR - Pre-Electrified - - - 121.29476 -8.75310 25010 5318030011 NANGARORO NUSA TENGGARA TIMUR 1 790 Pre-Electrified - - - 121.39203 -8.78662 25011 5318030011 NANGARORO NUSA TENGGARA TIMUR 282 Pre-Electrified - - - 121.38657 -8.78872 25012 5318030011 NANGARORO NUSA TENGGARA TIMUR 458 Pre-Electrified - - - 121.38672 -8.78186 25013 5318030011 NANGARORO NUSA TENGGARA TIMUR 128 Pre-Electrified - - - 121.38641 -8.77816 25014 5318030011 NANGARORO NUSA TENGGARA TIMUR 112 Pre-Electrified - - - 121.38621 -8.77605 25015 5318030011 NANGARORO NUSA TENGGARA TIMUR 61 Pre-Electrified - - - 121.38071 -8.76798 25016 5318030011 NANGARORO NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 121.37949 -8.77282 25017 5318030011 NANGARORO NUSA TENGGARA TIMUR 48 Pre-Electrified - - - 121.38703 -8.78534 25018 5318030012 NATAUTE NUSA TENGGARA TIMUR 200 Pre-Electrified - - - 121.39542 -8.78776 25019 5318030012 NATAUTE NUSA TENGGARA TIMUR 217 Pre-Electrified - - - 121.41423 -8.78780 25020 5318030012 NATAUTE NUSA TENGGARA TIMUR 46 MiniGrid Systems 12 10 188 2.2 121.41594 -8.76502 25021 5318030014 BIDOA NUSA TENGGARA TIMUR 501 Pre-Electrified - - - 121.33687 -8.72621 25022 5318030014 BIDOA NUSA TENGGARA TIMUR 84 Pre-Electrified - - - 121.33458 -8.73193 25023 5318030015 ULUPULU NUSA TENGGARA TIMUR 732 Pre-Electrified - - - 121.30434 -8.74024 25024 5318030015 ULUPULU NUSA TENGGARA TIMUR 427 Pre-Electrified - - - 121.31025 -8.73365 25025 5318030015 ULUPULU NUSA TENGGARA TIMUR 87 Pre-Electrified - - - 121.31844 -8.73065 25026 5318030016 WOEDOA NUSA TENGGARA TIMUR 180 Pre-Electrified - - - 121.35777 -8.76003 25027 5318030016 WOEDOA NUSA TENGGARA TIMUR 135 Pre-Electrified - - - 121.36285 -8.76563 25028 5318030017 ULUPULU 1 NUSA TENGGARA TIMUR 85 Pre-Electrified - - - 121.29626 -8.75064 25029 5318030017 ULUPULU 1 NUSA TENGGARA TIMUR 1 078 Pre-Electrified - - - 121.29861 -8.74502 25030 5318040001 ROWA NUSA TENGGARA TIMUR 325 Pre-Electrified - - - 121.12421 -8.78651 25031 5318040001 ROWA NUSA TENGGARA TIMUR 170 Pre-Electrified - - - 121.12315 -8.78351 25032 5318040001 ROWA NUSA TENGGARA TIMUR 279 Pre-Electrified - - - 121.12635 -8.78695 25033 5318040001 ROWA NUSA TENGGARA TIMUR 292 Pre-Electrified - - - 121.12853 -8.78573 25034 5318040001 ROWA NUSA TENGGARA TIMUR 129 Pre-Electrified - - - 121.13227 -8.78391 25035 5318040002 SOLO NUSA TENGGARA TIMUR 202 Pre-Electrified - - - 121.13987 -8.77888 25036 5318040002 SOLO NUSA TENGGARA TIMUR 236 Pre-Electrified - - - 121.13716 -8.77464 25037 5318040002 SOLO NUSA TENGGARA TIMUR 98 Pre-Electrified - - - 121.13696 -8.77327 25038 5318040002 SOLO NUSA TENGGARA TIMUR 65 Pre-Electrified - - - 121.13418 -8.77808 25039 5318040002 SOLO NUSA TENGGARA TIMUR 135 Pre-Electrified - - - 121.13627 -8.77613 25040 5318040003 KELEWAE NUSA TENGGARA TIMUR 406 Pre-Electrified - - - 121.16561 -8.82778 25041 5318040003 KELEWAE NUSA TENGGARA TIMUR 468 Pre-Electrified - - - 121.16020 -8.81336 25042 5318040003 KELEWAE NUSA TENGGARA TIMUR 150 Pre-Electrified - - - 121.16229 -8.81726 25043 5318040003 KELEWAE NUSA TENGGARA TIMUR 138 Pre-Electrified - - - 121.16232 -8.82858 25044 5318040003 KELEWAE NUSA TENGGARA TIMUR 83 Pre-Electrified - - - 121.16860 -8.82972 Annex II – Demand forecast results Page 177 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 25045 5318040003 KELEWAE NUSA TENGGARA TIMUR 105 Pre-Electrified - - - 121.16079 -8.81856 25046 5318040004 LEGUDERU NUSA TENGGARA TIMUR 323 Pre-Electrified - - - 121.15293 -8.80164 25047 5318040004 LEGUDERU NUSA TENGGARA TIMUR 330 Pre-Electrified - - - 121.15355 -8.81070 25048 5318040004 LEGUDERU NUSA TENGGARA TIMUR 354 Pre-Electrified - - - 121.15343 -8.79781 25049 5318040004 LEGUDERU NUSA TENGGARA TIMUR 76 Pre-Electrified - - - 121.15127 -8.79605 25050 5318040005 NAGESAPADHI NUSA TENGGARA TIMUR 140 Pre-Electrified - - - 121.16292 -8.76616 25051 5318040005 NAGESAPADHI NUSA TENGGARA TIMUR 737 Pre-Electrified - - - 121.15143 -8.76367 25052 5318040005 NAGESAPADHI NUSA TENGGARA TIMUR 261 Pre-Electrified - - - 121.16200 -8.76609 25053 5318040005 NAGESAPADHI NUSA TENGGARA TIMUR 273 Pre-Electrified - - - 121.15714 -8.76240 25054 5318040005 NAGESAPADHI NUSA TENGGARA TIMUR 115 Pre-Electrified - - - 121.15445 -8.76375 25055 5318040005 NAGESAPADHI NUSA TENGGARA TIMUR 276 Pre-Electrified - - - 121.16221 -8.76363 25056 5318040006 RIGI NUSA TENGGARA TIMUR 734 Pre-Electrified - - - 121.14657 -8.76878 25057 5318040006 RIGI NUSA TENGGARA TIMUR 154 Pre-Electrified - - - 121.14781 -8.78349 25058 5318040008 NATANAGE NUSA TENGGARA TIMUR 2 610 Pre-Electrified - - - 121.16393 -8.76319 25059 5318040008 NATANAGE NUSA TENGGARA TIMUR 23 Pre-Electrified - - - 121.16909 -8.76982 25060 5318040008 NATANAGE NUSA TENGGARA TIMUR 89 Pre-Electrified - - - 121.16494 -8.75904 25061 5318040009 NAGEOGA NUSA TENGGARA TIMUR 682 Pre-Electrified - - - 121.17401 -8.76783 25062 5318040009 NAGEOGA NUSA TENGGARA TIMUR 550 Pre-Electrified - - - 121.17509 -8.76469 25063 5318040009 NAGEOGA NUSA TENGGARA TIMUR 432 Pre-Electrified - - - 121.18584 -8.76256 25064 5318040009 NAGEOGA NUSA TENGGARA TIMUR 476 Pre-Electrified - - - 121.18201 -8.76715 25065 5318040009 NAGEOGA NUSA TENGGARA TIMUR 263 Pre-Electrified - - - 121.18070 -8.76263 25066 5318040009 NAGEOGA NUSA TENGGARA TIMUR 2 Pre-Electrified - - - 121.17068 -8.75711 25067 5318040010 WOLOPOGO NUSA TENGGARA TIMUR 1 259 Pre-Electrified - - - 121.20388 -8.77392 25068 5318040011 REGA NUSA TENGGARA TIMUR 908 Pre-Electrified - - - 121.20814 -8.77272 25069 5318040011 REGA NUSA TENGGARA TIMUR 1 001 Pre-Electrified - - - 121.20759 -8.76692 25070 5318040011 REGA NUSA TENGGARA TIMUR 268 Pre-Electrified - - - 121.20189 -8.76581 25071 5318040011 REGA NUSA TENGGARA TIMUR 46 Pre-Electrified - - - 121.20696 -8.76900 25072 5318040011 REGA NUSA TENGGARA TIMUR 278 Pre-Electrified - - - 121.20565 -8.76962 25073 5318040012 MULAKOLI NUSA TENGGARA TIMUR 1 126 Pre-Electrified - - - 121.21682 -8.80614 25074 5318040012 MULAKOLI NUSA TENGGARA TIMUR 88 Pre-Electrified - - - 121.21934 -8.79611 25075 5318040013 KELIMADO NUSA TENGGARA TIMUR 515 Pre-Electrified - - - 121.21891 -8.78316 25076 5318040013 KELIMADO NUSA TENGGARA TIMUR 395 Pre-Electrified - - - 121.21597 -8.78071 25077 5318040013 KELIMADO NUSA TENGGARA TIMUR 219 Pre-Electrified - - - 121.21978 -8.78842 25078 5318040013 KELIMADO NUSA TENGGARA TIMUR 156 Pre-Electrified - - - 121.22011 -8.78650 25079 5318040013 KELIMADO NUSA TENGGARA TIMUR 148 Pre-Electrified - - - 121.22083 -8.78993 25080 5318040013 KELIMADO NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 121.21990 -8.79091 25081 5318040014 WEA AU NUSA TENGGARA TIMUR 175 Pre-Electrified - - - 121.24355 -8.77837 25082 5318040015 RAJA NUSA TENGGARA TIMUR 58 Pre-Electrified - - - 121.24939 -8.75621 25083 5318040015 RAJA NUSA TENGGARA TIMUR 96 Pre-Electrified - - - 121.24960 -8.76004 25084 5318040015 RAJA NUSA TENGGARA TIMUR 1 Pre-Electrified - - - 121.24997 -8.75686 25085 5318040015 RAJA NUSA TENGGARA TIMUR 122 Pre-Electrified - - - 121.24834 -8.75934 25086 5318040015 RAJA NUSA TENGGARA TIMUR 104 Pre-Electrified - - - 121.24920 -8.75800 25087 5318040015 RAJA NUSA TENGGARA TIMUR 846 Pre-Electrified - - - 121.25867 -8.76963 25088 5318040015 RAJA NUSA TENGGARA TIMUR 566 Pre-Electrified - - - 121.25304 -8.75457 25089 5318040015 RAJA NUSA TENGGARA TIMUR 169 Pre-Electrified - - - 121.26233 -8.75195 25090 5318040015 RAJA NUSA TENGGARA TIMUR 128 Pre-Electrified - - - 121.25075 -8.75853 25091 5318040015 RAJA NUSA TENGGARA TIMUR 99 Pre-Electrified - - - 121.25734 -8.75597 25092 5318040015 RAJA NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 121.25862 -8.76141 25093 5318040015 RAJA NUSA TENGGARA TIMUR 94 Pre-Electrified - - - 121.25817 -8.75817 25094 5318040015 RAJA NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 121.29426 -8.75295 25095 5318040015 RAJA NUSA TENGGARA TIMUR 119 Pre-Electrified - - - 121.29521 -8.75191 25096 5318040015 RAJA NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 121.25073 -8.75707 25097 5318040015 RAJA NUSA TENGGARA TIMUR 52 Pre-Electrified - - - 121.25888 -8.75476 25098 5318040015 RAJA NUSA TENGGARA TIMUR 46 Pre-Electrified - - - 121.25900 -8.76424 25099 5318040015 RAJA NUSA TENGGARA TIMUR 132 Pre-Electrified - - - 121.25893 -8.75299 25100 5318040015 RAJA NUSA TENGGARA TIMUR 146 Pre-Electrified - - - 121.29269 -8.75210 25101 5318040015 RAJA NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 121.25903 -8.76079 25102 5318040015 RAJA NUSA TENGGARA TIMUR 25 Pre-Electrified - - - 121.25731 -8.75418 25103 5318040016 WOLOWEA NUSA TENGGARA TIMUR 1 728 Pre-Electrified - - - 121.23298 -8.76946 25104 5318040016 WOLOWEA NUSA TENGGARA TIMUR 151 Pre-Electrified - - - 121.24366 -8.77417 25105 5318040016 WOLOWEA NUSA TENGGARA TIMUR 96 Pre-Electrified - - - 121.23934 -8.76925 25106 5318040016 WOLOWEA NUSA TENGGARA TIMUR 71 Pre-Electrified - - - 121.24259 -8.77138 25107 5318040016 WOLOWEA NUSA TENGGARA TIMUR 92 Pre-Electrified - - - 121.23715 -8.77153 25108 5318040016 WOLOWEA NUSA TENGGARA TIMUR 37 Pre-Electrified - - - 121.24461 -8.76724 25109 5318040016 WOLOWEA NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 121.24567 -8.76482 25110 5318040016 WOLOWEA NUSA TENGGARA TIMUR 16 Pre-Electrified - - - 121.24252 -8.76373 25111 5318040016 WOLOWEA NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 121.24104 -8.76627 25112 5318040016 WOLOWEA NUSA TENGGARA TIMUR 79 Pre-Electrified - - - 121.24190 -8.76539 25113 5318040017 RATONGAMOBO NUSA TENGGARA TIMUR 1 198 Pre-Electrified - - - 121.18507 -8.72961 25114 5318040017 RATONGAMOBO NUSA TENGGARA TIMUR 757 Pre-Electrified - - - 121.18528 -8.74436 25115 5318040019 GERODHERE NUSA TENGGARA TIMUR 104 MiniGrid Systems 24 20 376 4.4 121.22089 -8.72483 25116 5318040023 NATANAGE TIMUR NUSA TENGGARA TIMUR 498 Pre-Electrified - - - 121.16941 -8.76377 25117 5318040023 NATANAGE TIMUR NUSA TENGGARA TIMUR 632 Pre-Electrified - - - 121.17046 -8.76899 25118 5318040023 NATANAGE TIMUR NUSA TENGGARA TIMUR 207 Pre-Electrified - - - 121.17207 -8.76971 25119 5318040023 NATANAGE TIMUR NUSA TENGGARA TIMUR 181 Pre-Electrified - - - 121.16915 -8.76143 25120 5318040023 NATANAGE TIMUR NUSA TENGGARA TIMUR 368 Pre-Electrified - - - 121.17041 -8.75757 25121 5318040023 NATANAGE TIMUR NUSA TENGGARA TIMUR 193 Pre-Electrified - - - 121.17150 -8.76435 25122 5318050002 LANGEDHAWE NUSA TENGGARA TIMUR 56 MiniGrid Systems 13 11 037 2.4 121.24412 -8.61090 25123 5318060009 LABOLEWA NUSA TENGGARA TIMUR 270 Pre-Electrified - - - 121.32532 -8.66607 25124 5318060009 LABOLEWA NUSA TENGGARA TIMUR 134 Pre-Electrified - - - 121.32747 -8.67581 25125 5318060009 LABOLEWA NUSA TENGGARA TIMUR 208 Pre-Electrified - - - 121.32747 -8.68414 25126 5318060009 LABOLEWA NUSA TENGGARA TIMUR 181 Pre-Electrified - - - 121.32552 -8.67013 25127 5318060009 LABOLEWA NUSA TENGGARA TIMUR 264 Pre-Electrified - - - 121.32581 -8.68814 25128 5318060009 LABOLEWA NUSA TENGGARA TIMUR 258 Pre-Electrified - - - 121.32518 -8.65770 25129 5318060009 LABOLEWA NUSA TENGGARA TIMUR 124 MiniGrid Systems 25 21 225 4.6 121.28582 -8.67130 Annex II – Demand forecast results Page 178 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 25130 5318060010 OLAIA NUSA TENGGARA TIMUR 581 Pre-Electrified - - - 121.32364 -8.64207 25131 5318060010 OLAIA NUSA TENGGARA TIMUR 277 Pre-Electrified - - - 121.32599 -8.63148 25132 5318060010 OLAIA NUSA TENGGARA TIMUR 188 Pre-Electrified - - - 121.32303 -8.63936 25133 5318060010 OLAIA NUSA TENGGARA TIMUR 177 Pre-Electrified - - - 121.32003 -8.63473 25134 5318060010 OLAIA NUSA TENGGARA TIMUR 181 Pre-Electrified - - - 121.32168 -8.63688 25135 5318060010 OLAIA NUSA TENGGARA TIMUR 87 Pre-Electrified - - - 121.31792 -8.63606 25136 5318060011 NGEGEDHAWE NUSA TENGGARA TIMUR 775 Pre-Electrified - - - 121.32749 -8.61845 25137 5318060012 LAPE NUSA TENGGARA TIMUR 2 293 Pre-Electrified - - - 121.29406 -8.57181 25138 5318060012 LAPE NUSA TENGGARA TIMUR 192 Pre-Electrified - - - 121.29827 -8.57271 25139 5318060012 LAPE NUSA TENGGARA TIMUR 255 Pre-Electrified - - - 121.29091 -8.57497 25140 5318060012 LAPE NUSA TENGGARA TIMUR 108 Pre-Electrified - - - 121.30827 -8.54881 25141 5318060012 LAPE NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 121.30407 -8.54122 25142 5318060013 DANGA NUSA TENGGARA TIMUR 3 787 Pre-Electrified - - - 121.27040 -8.56565 25143 5318060013 DANGA NUSA TENGGARA TIMUR 545 Pre-Electrified - - - 121.26119 -8.56587 25144 5318060013 DANGA NUSA TENGGARA TIMUR 385 Pre-Electrified - - - 121.27679 -8.55751 25145 5318060013 DANGA NUSA TENGGARA TIMUR 119 Pre-Electrified - - - 121.25867 -8.56867 25146 5318060013 DANGA NUSA TENGGARA TIMUR 62 Pre-Electrified - - - 121.26724 -8.55964 25147 5318060013 DANGA NUSA TENGGARA TIMUR 91 Pre-Electrified - - - 121.26889 -8.56294 25148 5318060013 DANGA NUSA TENGGARA TIMUR 127 Pre-Electrified - - - 121.27323 -8.55684 25149 5318060013 DANGA NUSA TENGGARA TIMUR 1 719 Pre-Electrified - - - 121.27194 -8.55976 25150 5318060014 NGGOLO MBAY NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 121.24967 -8.57207 25151 5318060014 NGGOLO MBAY NUSA TENGGARA TIMUR 623 Pre-Electrified - - - 121.25217 -8.57124 25152 5318060014 NGGOLO MBAY NUSA TENGGARA TIMUR 163 Pre-Electrified - - - 121.26519 -8.55834 25153 5318060015 TOWAK NUSA TENGGARA TIMUR 579 Pre-Electrified - - - 121.26081 -8.53024 25154 5318060015 TOWAK NUSA TENGGARA TIMUR 208 Pre-Electrified - - - 121.26025 -8.53580 25155 5318060015 TOWAK NUSA TENGGARA TIMUR 214 Pre-Electrified - - - 121.25807 -8.53164 25156 5318060015 TOWAK NUSA TENGGARA TIMUR 35 Pre-Electrified - - - 121.25934 -8.52971 25157 5318060016 NGGOLONIO NUSA TENGGARA TIMUR 101 MiniGrid Systems 28 23 772 5.1 121.18976 -8.45301 25158 5318060018 MBAY II NUSA TENGGARA TIMUR 526 Pre-Electrified - - - 121.27906 -8.51058 25159 5318060018 MBAY II NUSA TENGGARA TIMUR 23 Pre-Electrified - - - 121.28397 -8.51437 25160 5318060018 MBAY II NUSA TENGGARA TIMUR 14 Pre-Electrified - - - 121.28567 -8.51182 25161 5318060018 MBAY II NUSA TENGGARA TIMUR 12 Pre-Electrified - - - 121.26983 -8.53196 25162 5318060018 MBAY II NUSA TENGGARA TIMUR 35 MiniGrid Systems 9 7 641 1.6 121.28659 -8.47594 25163 5318060019 MBAY I NUSA TENGGARA TIMUR 1 901 Pre-Electrified - - - 121.26937 -8.55403 25164 5318060019 MBAY I NUSA TENGGARA TIMUR 690 Pre-Electrified - - - 121.27476 -8.53138 25165 5318060019 MBAY I NUSA TENGGARA TIMUR 235 Pre-Electrified - - - 121.28320 -8.52167 25166 5318060019 MBAY I NUSA TENGGARA TIMUR 184 Pre-Electrified - - - 121.26189 -8.53876 25167 5318060019 MBAY I NUSA TENGGARA TIMUR 85 Pre-Electrified - - - 121.28475 -8.51794 25168 5318060019 MBAY I NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 121.26546 -8.55047 25169 5318060019 MBAY I NUSA TENGGARA TIMUR 106 Pre-Electrified - - - 121.27358 -8.54426 25170 5318060020 TONGGU RAMBANG NUSA TENGGARA TIMUR 842 Pre-Electrified - - - 121.29868 -8.50560 25171 5318060020 TONGGU RAMBANG NUSA TENGGARA TIMUR 101 Pre-Electrified - - - 121.29112 -8.50473 25172 5318060021 MARAPOKOT NUSA TENGGARA TIMUR 224 Pre-Electrified - - - 121.30403 -8.54037 25173 5318060023 AERAMO NUSA TENGGARA TIMUR 3 089 Pre-Electrified - - - 121.32789 -8.57758 25174 5318060023 AERAMO NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 121.31142 -8.57488 25175 5318060023 AERAMO NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 121.33240 -8.57905 25176 5318060023 AERAMO NUSA TENGGARA TIMUR 179 Pre-Electrified - - - 121.31978 -8.57981 25177 5318060023 AERAMO NUSA TENGGARA TIMUR 61 Pre-Electrified - - - 121.32528 -8.58448 25178 5318070003 TOTOMALA NUSA TENGGARA TIMUR 33 MiniGrid Systems 8 6 792 1.5 121.41675 -8.60854 25179 5318070004 TENDATOTO NUSA TENGGARA TIMUR 122 MiniGrid Systems 27 22 923 4.9 121.46079 -8.66433 25180 5319010003 NANGA LABANG NUSA TENGGARA TIMUR 483 Pre-Electrified - - - 120.57688 -8.81265 25181 5319010003 NANGA LABANG NUSA TENGGARA TIMUR 237 Pre-Electrified - - - 120.59823 -8.80549 25182 5319010003 NANGA LABANG NUSA TENGGARA TIMUR 94 Pre-Electrified - - - 120.58367 -8.79276 25183 5319010003 NANGA LABANG NUSA TENGGARA TIMUR 389 Pre-Electrified - - - 120.57720 -8.79343 25184 5319010003 NANGA LABANG NUSA TENGGARA TIMUR 32 MiniGrid Systems 8 6 792 1.5 120.55939 -8.81313 25185 5319010003 NANGA LABANG NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 120.58809 -8.81365 25186 5319010003 NANGA LABANG NUSA TENGGARA TIMUR 230 Pre-Electrified - - - 120.58361 -8.80428 25187 5319010003 NANGA LABANG NUSA TENGGARA TIMUR 11 Pre-Electrified - - - 120.60208 -8.80484 25188 5319010004 GOLO KANTAR NUSA TENGGARA TIMUR 1 199 Pre-Electrified - - - 120.58871 -8.79103 25189 5319010004 GOLO KANTAR NUSA TENGGARA TIMUR 324 Pre-Electrified - - - 120.58528 -8.79960 25190 5319010005 RANA LOBA NUSA TENGGARA TIMUR 2 536 Pre-Electrified - - - 120.60995 -8.81348 25191 5319010005 RANA LOBA NUSA TENGGARA TIMUR 679 Pre-Electrified - - - 120.62016 -8.78121 25192 5319010005 RANA LOBA NUSA TENGGARA TIMUR 257 Pre-Electrified - - - 120.60602 -8.80685 25193 5319010005 RANA LOBA NUSA TENGGARA TIMUR 383 Pre-Electrified - - - 120.61195 -8.80406 25194 5319010006 KOTA NDORA NUSA TENGGARA TIMUR 3 866 Pre-Electrified - - - 120.61691 -8.81841 25195 5319010006 KOTA NDORA NUSA TENGGARA TIMUR 237 Pre-Electrified - - - 120.63113 -8.81074 25196 5319010006 KOTA NDORA NUSA TENGGARA TIMUR 125 Pre-Electrified - - - 120.63813 -8.80818 25197 5319010014 GOLO MELENG NUSA TENGGARA TIMUR 95 Pre-Electrified - - - 120.57738 -8.69854 25198 5319010015 GOLO RUTUK NUSA TENGGARA TIMUR 32 MiniGrid Systems 7 5 943 1.3 120.57190 -8.65307 25199 5319010015 GOLO RUTUK NUSA TENGGARA TIMUR 27 MiniGrid Systems 6 5 094 1.1 120.58393 -8.67569 25200 5319010016 GOLO LONI NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 120.55665 -8.67743 25201 5319010016 GOLO LONI NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 120.56426 -8.67471 25202 5319010016 GOLO LONI NUSA TENGGARA TIMUR 95 Pre-Electrified - - - 120.56276 -8.66864 25203 5319010016 GOLO LONI NUSA TENGGARA TIMUR 72 Pre-Electrified - - - 120.56345 -8.66656 25204 5319010016 GOLO LONI NUSA TENGGARA TIMUR 82 Pre-Electrified - - - 120.56211 -8.68756 25205 5319010016 GOLO LONI NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 120.55736 -8.67666 25206 5319010016 GOLO LONI NUSA TENGGARA TIMUR 152 Pre-Electrified - - - 120.56158 -8.65996 25207 5319010016 GOLO LONI NUSA TENGGARA TIMUR 107 Pre-Electrified - - - 120.57024 -8.69736 25208 5319010016 GOLO LONI NUSA TENGGARA TIMUR 132 Pre-Electrified - - - 120.56237 -8.66473 25209 5319010016 GOLO LONI NUSA TENGGARA TIMUR 55 Pre-Electrified - - - 120.55441 -8.67053 25210 5319010016 GOLO LONI NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 120.56305 -8.65694 25211 5319010016 GOLO LONI NUSA TENGGARA TIMUR 136 Pre-Electrified - - - 120.56372 -8.68688 25212 5319010017 SITA NUSA TENGGARA TIMUR 508 Pre-Electrified - - - 120.57826 -8.78460 25213 5319010017 SITA NUSA TENGGARA TIMUR 1 123 Pre-Electrified - - - 120.57561 -8.76280 25214 5319010017 SITA NUSA TENGGARA TIMUR 83 Pre-Electrified - - - 120.57229 -8.75229 Annex II – Demand forecast results Page 179 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 25215 5319010017 SITA NUSA TENGGARA TIMUR 172 Pre-Electrified - - - 120.57531 -8.75810 25216 5319010017 SITA NUSA TENGGARA TIMUR 257 Pre-Electrified - - - 120.55976 -8.69948 25217 5319010017 SITA NUSA TENGGARA TIMUR 129 Pre-Electrified - - - 120.56112 -8.71860 25218 5319010017 SITA NUSA TENGGARA TIMUR 117 Pre-Electrified - - - 120.55959 -8.71572 25219 5319010017 SITA NUSA TENGGARA TIMUR 66 Pre-Electrified - - - 120.57235 -8.73593 25220 5319010017 SITA NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 120.55841 -8.70100 25221 5319010017 SITA NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 120.56281 -8.70166 25222 5319010017 SITA NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 120.56296 -8.69972 25223 5319010017 SITA NUSA TENGGARA TIMUR 80 Pre-Electrified - - - 120.57117 -8.71292 25224 5319010017 SITA NUSA TENGGARA TIMUR 136 Pre-Electrified - - - 120.57820 -8.73132 25225 5319010018 TOROK GOLO NUSA TENGGARA TIMUR 110 Pre-Electrified - - - 120.56355 -8.75257 25226 5319020001 TANAH RATA NUSA TENGGARA TIMUR 941 Pre-Electrified - - - 120.66210 -8.80907 25227 5319020001 TANAH RATA NUSA TENGGARA TIMUR 629 Pre-Electrified - - - 120.67691 -8.80840 25228 5319020001 TANAH RATA NUSA TENGGARA TIMUR 1 070 Pre-Electrified - - - 120.66033 -8.80194 25229 5319020001 TANAH RATA NUSA TENGGARA TIMUR 397 Pre-Electrified - - - 120.66788 -8.81593 25230 5319020001 TANAH RATA NUSA TENGGARA TIMUR 300 Pre-Electrified - - - 120.65470 -8.81033 25231 5319020001 TANAH RATA NUSA TENGGARA TIMUR 205 Pre-Electrified - - - 120.66752 -8.81062 25232 5319020001 TANAH RATA NUSA TENGGARA TIMUR 122 Pre-Electrified - - - 120.67120 -8.81615 25233 5319020001 TANAH RATA NUSA TENGGARA TIMUR 52 Pre-Electrified - - - 120.65692 -8.80839 25234 5319020001 TANAH RATA NUSA TENGGARA TIMUR 45 MiniGrid Systems 11 9 339 2.0 120.67010 -8.84926 25235 5319020002 BAMO NUSA TENGGARA TIMUR 120 Pre-Electrified - - - 120.68880 -8.79646 25236 5319020003 RONGGA KOE NUSA TENGGARA TIMUR 264 Pre-Electrified - - - 120.72328 -8.78452 25237 5319020003 RONGGA KOE NUSA TENGGARA TIMUR 406 Pre-Electrified - - - 120.71403 -8.78165 25238 5319020003 RONGGA KOE NUSA TENGGARA TIMUR 436 Pre-Electrified - - - 120.70960 -8.77557 25239 5319020003 RONGGA KOE NUSA TENGGARA TIMUR 197 Pre-Electrified - - - 120.72526 -8.78669 25240 5319020003 RONGGA KOE NUSA TENGGARA TIMUR 134 Pre-Electrified - - - 120.72165 -8.77924 25241 5319020003 RONGGA KOE NUSA TENGGARA TIMUR 114 Pre-Electrified - - - 120.72247 -8.78676 25242 5319020003 RONGGA KOE NUSA TENGGARA TIMUR 149 Pre-Electrified - - - 120.71024 -8.78046 25243 5319020003 RONGGA KOE NUSA TENGGARA TIMUR 93 Pre-Electrified - - - 120.72413 -8.78838 25244 5319020003 RONGGA KOE NUSA TENGGARA TIMUR 601 Pre-Electrified - - - 120.71038 -8.78286 25245 5319020003 RONGGA KOE NUSA TENGGARA TIMUR 521 Pre-Electrified - - - 120.71944 -8.78502 25246 5319020003 RONGGA KOE NUSA TENGGARA TIMUR 157 Pre-Electrified - - - 120.69346 -8.78508 25247 5319020003 RONGGA KOE NUSA TENGGARA TIMUR 18 Pre-Electrified - - - 120.69301 -8.79114 25248 5319020004 KOMBA NUSA TENGGARA TIMUR 919 Pre-Electrified - - - 120.73868 -8.79250 25249 5319020004 KOMBA NUSA TENGGARA TIMUR 238 Pre-Electrified - - - 120.72980 -8.79156 25250 5319020005 WATU NGGENE NUSA TENGGARA TIMUR 1 652 Pre-Electrified - - - 120.80815 -8.82694 25251 5319020005 WATU NGGENE NUSA TENGGARA TIMUR 665 Pre-Electrified - - - 120.79801 -8.83264 25252 5319020005 WATU NGGENE NUSA TENGGARA TIMUR 423 Pre-Electrified - - - 120.79692 -8.82741 25253 5319020005 WATU NGGENE NUSA TENGGARA TIMUR 102 Pre-Electrified - - - 120.80582 -8.82369 25254 5319020005 WATU NGGENE NUSA TENGGARA TIMUR 86 Pre-Electrified - - - 120.79638 -8.83259 25255 5319020007 RANA KOLONG NUSA TENGGARA TIMUR 73 MiniGrid Systems 20 16 980 3.7 120.74382 -8.75285 25256 5319020009 LEMBUR NUSA TENGGARA TIMUR 2 686 Pre-Electrified - - - 120.67890 -8.77494 25257 5319020009 LEMBUR NUSA TENGGARA TIMUR 220 Pre-Electrified - - - 120.67674 -8.77257 25258 5319020009 LEMBUR NUSA TENGGARA TIMUR 106 Pre-Electrified - - - 120.68510 -8.76830 25259 5319020009 LEMBUR NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 120.65228 -8.79868 25260 5319020009 LEMBUR NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 120.66410 -8.78994 25261 5319020009 LEMBUR NUSA TENGGARA TIMUR 204 Pre-Electrified - - - 120.66172 -8.79562 25262 5319020011 PONG RUAN NUSA TENGGARA TIMUR 1 118 Pre-Electrified - - - 120.67923 -8.76010 25263 5319020011 PONG RUAN NUSA TENGGARA TIMUR 2 OffGrid Systems 1 849 0.2 120.68487 -8.74963 25264 5319020017 GOLO NDERU NUSA TENGGARA TIMUR 63 MiniGrid Systems 17 14 433 3.1 120.74125 -8.64723 25265 5319030005 LANGGASAI NUSA TENGGARA TIMUR - Pre-Electrified - - - 120.81781 -8.61514 25266 5319030014 HAJU NGENDONG NUSA TENGGARA TIMUR 1 OffGrid Systems 1 849 0.2 120.75003 -8.55164 25267 5319030015 LENGKO NAMUT NUSA TENGGARA TIMUR 24 MiniGrid Systems 6 5 094 1.1 120.75424 -8.52180 25268 5319030015 LENGKO NAMUT NUSA TENGGARA TIMUR 9 OffGrid Systems 3 2 547 0.5 120.75127 -8.51561 25269 5319030019 GOLO LEBO NUSA TENGGARA TIMUR 473 MiniGrid Systems 70 59 430 12.8 120.76826 -8.44406 25270 5319030021 GOLO LIJUN NUSA TENGGARA TIMUR - Pre-Electrified - - - 120.94915 -8.37543 25271 5319040005 BUTI NUSA TENGGARA TIMUR - Pre-Electrified - - - 120.71925 -8.50002 25272 5319040006 GOLO WANGKUNG NUSA TENGGARA TIMUR 8 OffGrid Systems 2 1 698 0.4 120.67656 -8.49570 25273 5319040006 GOLO WANGKUNG NUSA TENGGARA TIMUR 4 OffGrid Systems 1 849 0.2 120.66491 -8.49716 25274 5319040007 LADA MESE NUSA TENGGARA TIMUR 39 MiniGrid Systems 10 8 490 1.8 120.66036 -8.46994 25275 5319040007 LADA MESE NUSA TENGGARA TIMUR 34 MiniGrid Systems 9 7 641 1.6 120.67198 -8.48454 25276 5319040008 NANGA BARAS NUSA TENGGARA TIMUR 80 MiniGrid Systems 17 14 433 3.1 120.67607 -8.44537 25277 5319040008 NANGA BARAS NUSA TENGGARA TIMUR 58 MiniGrid Systems 13 11 037 2.4 120.68001 -8.41987 25278 5319040008 NANGA BARAS NUSA TENGGARA TIMUR 53 MiniGrid Systems 12 10 188 2.2 120.67976 -8.44247 25279 5319040008 NANGA BARAS NUSA TENGGARA TIMUR 84 MiniGrid Systems 18 15 282 3.3 120.67280 -8.43468 25280 5319040010 POTA NUSA TENGGARA TIMUR 55 Pre-Electrified - - - 120.74087 -8.35545 25281 5319040010 POTA NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 120.74902 -8.35013 25282 5319040010 POTA NUSA TENGGARA TIMUR 872 Pre-Electrified - - - 120.76288 -8.34126 25283 5319040010 POTA NUSA TENGGARA TIMUR 591 Pre-Electrified - - - 120.75981 -8.33908 25284 5319040010 POTA NUSA TENGGARA TIMUR 296 Pre-Electrified - - - 120.75320 -8.35044 25285 5319040010 POTA NUSA TENGGARA TIMUR 220 Pre-Electrified - - - 120.76267 -8.33775 25286 5319040010 POTA NUSA TENGGARA TIMUR 131 Pre-Electrified - - - 120.75312 -8.34657 25287 5319040010 POTA NUSA TENGGARA TIMUR 118 Pre-Electrified - - - 120.75326 -8.34874 25288 5319040010 POTA NUSA TENGGARA TIMUR 172 Pre-Electrified - - - 120.76556 -8.35473 25289 5319040010 POTA NUSA TENGGARA TIMUR 119 Pre-Electrified - - - 120.76110 -8.34580 25290 5319040010 POTA NUSA TENGGARA TIMUR 95 Pre-Electrified - - - 120.75863 -8.34549 25291 5319040010 POTA NUSA TENGGARA TIMUR 112 Pre-Electrified - - - 120.75786 -8.34805 25292 5319040010 POTA NUSA TENGGARA TIMUR 58 Pre-Electrified - - - 120.75772 -8.34327 25293 5319040010 POTA NUSA TENGGARA TIMUR 47 Pre-Electrified - - - 120.76373 -8.35448 25294 5319040010 POTA NUSA TENGGARA TIMUR 23 Pre-Electrified - - - 120.75436 -8.34710 25295 5319040011 NANGA MBAUR NUSA TENGGARA TIMUR 85 MiniGrid Systems 13 11 037 2.4 120.84840 -8.35786 25296 5319040011 NANGA MBAUR NUSA TENGGARA TIMUR 56 MiniGrid Systems 9 7 641 1.6 120.85672 -8.35851 25297 5319040011 NANGA MBAUR NUSA TENGGARA TIMUR 44 MiniGrid Systems 7 5 943 1.3 120.77581 -8.35246 25298 5319040011 NANGA MBAUR NUSA TENGGARA TIMUR 23 OffGrid Systems 4 3 396 0.7 120.77363 -8.35877 25299 5319050001 GOLO LOBOS NUSA TENGGARA TIMUR 875 Pre-Electrified - - - 120.53040 -8.60419 Annex II – Demand forecast results Page 180 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 25300 5319050001 GOLO LOBOS NUSA TENGGARA TIMUR 1 OffGrid Systems 1 849 0.2 120.53304 -8.59391 25301 5319050001 GOLO LOBOS NUSA TENGGARA TIMUR 45 Pre-Electrified - - - 120.52930 -8.59795 25302 5319050003 MANDO SAWU NUSA TENGGARA TIMUR 276 Pre-Electrified - - - 120.54689 -8.60809 25303 5319050003 MANDO SAWU NUSA TENGGARA TIMUR 2 420 Pre-Electrified - - - 120.54044 -8.59635 25304 5319050003 MANDO SAWU NUSA TENGGARA TIMUR 266 Pre-Electrified - - - 120.54070 -8.60465 25305 5319050003 MANDO SAWU NUSA TENGGARA TIMUR 87 Pre-Electrified - - - 120.54228 -8.59599 25306 5319050003 MANDO SAWU NUSA TENGGARA TIMUR 21 Pre-Electrified - - - 120.54453 -8.60626 25307 5319050004 BANGKA PAU NUSA TENGGARA TIMUR 1 402 Pre-Electrified - - - 120.54865 -8.60926 25308 5319050005 NGGALAK LELENG NUSA TENGGARA TIMUR 380 Pre-Electrified - - - 120.56086 -8.60516 25309 5319050005 NGGALAK LELENG NUSA TENGGARA TIMUR 121 Pre-Electrified - - - 120.56572 -8.60037 25310 5319050005 NGGALAK LELENG NUSA TENGGARA TIMUR 32 Pre-Electrified - - - 120.56500 -8.60419 25311 5319050008 RENDE NAO NUSA TENGGARA TIMUR 536 Pre-Electrified - - - 120.61940 -8.58455 25312 5319050008 RENDE NAO NUSA TENGGARA TIMUR - Pre-Electrified - - - 120.62498 -8.59325 25313 5319050008 RENDE NAO NUSA TENGGARA TIMUR 510 Pre-Electrified - - - 120.62836 -8.59452 25314 5319050008 RENDE NAO NUSA TENGGARA TIMUR 71 Pre-Electrified - - - 120.62570 -8.59332 25315 5319050009 ULU WAE NUSA TENGGARA TIMUR 546 Pre-Electrified - - - 120.64222 -8.59397 25316 5319050009 ULU WAE NUSA TENGGARA TIMUR 656 Pre-Electrified - - - 120.63421 -8.59607 25317 5319050009 ULU WAE NUSA TENGGARA TIMUR 40 Pre-Electrified - - - 120.64524 -8.59670 25318 5319050009 ULU WAE NUSA TENGGARA TIMUR 10 Pre-Electrified - - - 120.63750 -8.59798 25319 5319060004 TENGKU LEDA NUSA TENGGARA TIMUR - Pre-Electrified - - - 120.58440 -8.44740 25320 5319060007 GOLO MUNGA NUSA TENGGARA TIMUR 77 MiniGrid Systems 20 16 980 3.7 120.57131 -8.37310 25321 5319060007 GOLO MUNGA NUSA TENGGARA TIMUR 43 MiniGrid Systems 11 9 339 2.0 120.56966 -8.37328 25322 5319060008 GOLO RENTUNG NUSA TENGGARA TIMUR 61 MiniGrid Systems 17 14 433 3.1 120.61192 -8.41450 25323 5319060012 GOLO MANGUNG NUSA TENGGARA TIMUR 85 MiniGrid Systems 21 17 829 3.8 120.59815 -8.36561 25324 5319060013 SATAR PADUT NUSA TENGGARA TIMUR 69 MiniGrid Systems 17 14 433 3.1 120.60278 -8.28518 25325 5319060016 SATAR PUNDA NUSA TENGGARA TIMUR 163 Pre-Electrified - - - 120.48643 -8.31664 25326 5319060016 SATAR PUNDA NUSA TENGGARA TIMUR 33 Pre-Electrified - - - 120.49473 -8.31156 25327 5319060016 SATAR PUNDA NUSA TENGGARA TIMUR 24 Pre-Electrified - - - 120.48388 -8.32267 25328 5319060016 SATAR PUNDA NUSA TENGGARA TIMUR 13 Pre-Electrified - - - 120.49576 -8.31262 25329 5319060016 SATAR PUNDA NUSA TENGGARA TIMUR 41 MiniGrid Systems 17 14 433 3.1 120.55286 -8.31614 25330 5319060016 SATAR PUNDA NUSA TENGGARA TIMUR 6 OffGrid Systems 3 2 547 0.5 120.51197 -8.28385 25331 5320020001 LOBOHEDE NUSA TENGGARA TIMUR 1 871 Pre-Electrified - - - 121.73062 -10.59174 25332 5320020006 MOLIE NUSA TENGGARA TIMUR 1 796 Pre-Electrified - - - 121.71813 -10.56706 25333 5320020008 TANAJAWA NUSA TENGGARA TIMUR 1 366 Pre-Electrified - - - 121.74080 -10.57605 25334 5320040008 NADAWAWI NUSA TENGGARA TIMUR 1 800 Pre-Electrified - - - 121.87904 -10.51319 25335 5320040011 RAELORO NUSA TENGGARA TIMUR 1 629 Pre-Electrified - - - 121.85230 -10.50015 25336 5320040013 MEBBA NUSA TENGGARA TIMUR 2 951 Pre-Electrified - - - 121.84428 -10.49183 25337 5320040015 LEDEANA NUSA TENGGARA TIMUR 1 532 Pre-Electrified - - - 121.82056 -10.51585 25338 5371010001 NAIONI NUSA TENGGARA TIMUR 383 Pre-Electrified - - - 123.60645 -10.26828 25339 5371010001 NAIONI NUSA TENGGARA TIMUR 265 Pre-Electrified - - - 123.60562 -10.25960 25340 5371010001 NAIONI NUSA TENGGARA TIMUR 138 Pre-Electrified - - - 123.60467 -10.25822 25341 5371010001 NAIONI NUSA TENGGARA TIMUR 140 Pre-Electrified - - - 123.60444 -10.25664 25342 5371010001 NAIONI NUSA TENGGARA TIMUR 118 Pre-Electrified - - - 123.60387 -10.25406 25343 5371010001 NAIONI NUSA TENGGARA TIMUR 267 Pre-Electrified - - - 123.60247 -10.26771 25344 5371010001 NAIONI NUSA TENGGARA TIMUR 118 Pre-Electrified - - - 123.60158 -10.26870 25345 5371010001 NAIONI NUSA TENGGARA TIMUR 470 Pre-Electrified - - - 123.59338 -10.26446 25346 5371010002 MANULAI II NUSA TENGGARA TIMUR 279 Pre-Electrified - - - 123.55940 -10.21923 25347 5371010002 MANULAI II NUSA TENGGARA TIMUR 587 Pre-Electrified - - - 123.56322 -10.22242 25348 5371010002 MANULAI II NUSA TENGGARA TIMUR 292 Pre-Electrified - - - 123.57307 -10.21705 25349 5371010002 MANULAI II NUSA TENGGARA TIMUR 1 297 Pre-Electrified - - - 123.57564 -10.21851 25350 5371010002 MANULAI II NUSA TENGGARA TIMUR 67 Pre-Electrified - - - 123.57432 -10.21623 25351 5371010002 MANULAI II NUSA TENGGARA TIMUR 186 Pre-Electrified - - - 123.57520 -10.21406 25352 5371010002 MANULAI II NUSA TENGGARA TIMUR 55 Pre-Electrified - - - 123.57552 -10.20383 25353 5371010002 MANULAI II NUSA TENGGARA TIMUR 398 Pre-Electrified - - - 123.57915 -10.20789 25354 5371010003 BATUPLAT NUSA TENGGARA TIMUR 50 Pre-Electrified - - - 123.57616 -10.20285 25355 5371010003 BATUPLAT NUSA TENGGARA TIMUR 2 607 Pre-Electrified - - - 123.58355 -10.19369 25356 5371010003 BATUPLAT NUSA TENGGARA TIMUR 9 Pre-Electrified - - - 123.57956 -10.20577 25357 5371010003 BATUPLAT NUSA TENGGARA TIMUR 108 Pre-Electrified - - - 123.58260 -10.20297 25358 5371010003 BATUPLAT NUSA TENGGARA TIMUR 175 Pre-Electrified - - - 123.58381 -10.19838 25359 5371010003 BATUPLAT NUSA TENGGARA TIMUR 421 Pre-Electrified - - - 123.59435 -10.20132 25360 5371010003 BATUPLAT NUSA TENGGARA TIMUR 348 Pre-Electrified - - - 123.59449 -10.19811 25361 5371010003 BATUPLAT NUSA TENGGARA TIMUR 153 Pre-Electrified - - - 123.59637 -10.20026 25362 5371010004 ALAK NUSA TENGGARA TIMUR 242 Pre-Electrified - - - 123.52903 -10.19293 25363 5371010004 ALAK NUSA TENGGARA TIMUR 217 Pre-Electrified - - - 123.52967 -10.19017 25364 5371010004 ALAK NUSA TENGGARA TIMUR 114 Pre-Electrified - - - 123.52996 -10.18925 25365 5371010004 ALAK NUSA TENGGARA TIMUR 500 Pre-Electrified - - - 123.53012 -10.19354 25366 5371010004 ALAK NUSA TENGGARA TIMUR 174 Pre-Electrified - - - 123.53027 -10.20320 25367 5371010004 ALAK NUSA TENGGARA TIMUR 144 Pre-Electrified - - - 123.53072 -10.19895 25368 5371010004 ALAK NUSA TENGGARA TIMUR 1 943 Pre-Electrified - - - 123.53215 -10.19922 25369 5371010004 ALAK NUSA TENGGARA TIMUR 239 Pre-Electrified - - - 123.53166 -10.19224 25370 5371010004 ALAK NUSA TENGGARA TIMUR 315 Pre-Electrified - - - 123.53206 -10.20356 25371 5371010004 ALAK NUSA TENGGARA TIMUR 1 047 Pre-Electrified - - - 123.53343 -10.19441 25372 5371010004 ALAK NUSA TENGGARA TIMUR 435 Pre-Electrified - - - 123.53666 -10.19188 25373 5371010004 ALAK NUSA TENGGARA TIMUR 302 Pre-Electrified - - - 123.54130 -10.21133 25374 5371010004 ALAK NUSA TENGGARA TIMUR 261 Pre-Electrified - - - 123.54461 -10.18390 25375 5371010004 ALAK NUSA TENGGARA TIMUR 345 Pre-Electrified - - - 123.56164 -10.20686 25376 5371010005 MANUTAPEN NUSA TENGGARA TIMUR 4 936 Pre-Electrified - - - 123.58202 -10.17799 25377 5371010005 MANUTAPEN NUSA TENGGARA TIMUR 446 Pre-Electrified - - - 123.58013 -10.17734 25378 5371010005 MANUTAPEN NUSA TENGGARA TIMUR 213 Pre-Electrified - - - 123.58117 -10.17983 25379 5371010006 MANTASI NUSA TENGGARA TIMUR 872 Pre-Electrified - - - 123.57976 -10.17179 25380 5371010007 FATUFETO NUSA TENGGARA TIMUR 4 537 Pre-Electrified - - - 123.57417 -10.16786 25381 5371010008 NUNHILA NUSA TENGGARA TIMUR 2 374 Pre-Electrified - - - 123.57271 -10.17201 25382 5371010009 NUNBAUN DELHA NUSA TENGGARA TIMUR 200 Pre-Electrified - - - 123.56738 -10.17402 25383 5371010009 NUNBAUN DELHA NUSA TENGGARA TIMUR 3 395 Pre-Electrified - - - 123.57198 -10.17340 25384 5371010010 NUNBAUN SABU NUSA TENGGARA TIMUR 3 538 Pre-Electrified - - - 123.56327 -10.17669 Annex II – Demand forecast results Page 181 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 25385 5371010010 NUNBAUN SABU NUSA TENGGARA TIMUR 89 Pre-Electrified - - - 123.56343 -10.18108 25386 5371010011 NAMOSAIN NUSA TENGGARA TIMUR 817 Pre-Electrified - - - 123.54814 -10.18007 25387 5371010011 NAMOSAIN NUSA TENGGARA TIMUR 1 246 Pre-Electrified - - - 123.55358 -10.18214 25388 5371010011 NAMOSAIN NUSA TENGGARA TIMUR 878 Pre-Electrified - - - 123.55575 -10.18200 25389 5371010011 NAMOSAIN NUSA TENGGARA TIMUR 6 661 Pre-Electrified - - - 123.56175 -10.17670 25390 5371010012 PENKASE-OELETA NUSA TENGGARA TIMUR 533 Pre-Electrified - - - 123.55752 -10.19297 25391 5371010012 PENKASE-OELETA NUSA TENGGARA TIMUR 407 Pre-Electrified - - - 123.55785 -10.18929 25392 5371010012 PENKASE-OELETA NUSA TENGGARA TIMUR 175 Pre-Electrified - - - 123.55803 -10.18770 25393 5371010012 PENKASE-OELETA NUSA TENGGARA TIMUR 207 Pre-Electrified - - - 123.55818 -10.19533 25394 5371010012 PENKASE-OELETA NUSA TENGGARA TIMUR 1 779 Pre-Electrified - - - 123.56083 -10.19492 25395 5371010012 PENKASE-OELETA NUSA TENGGARA TIMUR 1 077 Pre-Electrified - - - 123.55988 -10.18942 25396 5371010012 PENKASE-OELETA NUSA TENGGARA TIMUR 598 Pre-Electrified - - - 123.56118 -10.19277 25397 5371010012 PENKASE-OELETA NUSA TENGGARA TIMUR 719 Pre-Electrified - - - 123.56426 -10.18300 25398 5371010012 PENKASE-OELETA NUSA TENGGARA TIMUR 217 Pre-Electrified - - - 123.56292 -10.19728 25399 5371010012 PENKASE-OELETA NUSA TENGGARA TIMUR 42 Pre-Electrified - - - 123.56358 -10.18138 25400 5371020001 FATUKOA NUSA TENGGARA TIMUR 173 Pre-Electrified - - - 123.61052 -10.25159 25401 5371020001 FATUKOA NUSA TENGGARA TIMUR 158 Pre-Electrified - - - 123.59912 -10.22962 25402 5371020001 FATUKOA NUSA TENGGARA TIMUR 272 Pre-Electrified - - - 123.59920 -10.22699 25403 5371020001 FATUKOA NUSA TENGGARA TIMUR 451 Pre-Electrified - - - 123.60045 -10.23231 25404 5371020001 FATUKOA NUSA TENGGARA TIMUR 385 Pre-Electrified - - - 123.60091 -10.21869 25405 5371020001 FATUKOA NUSA TENGGARA TIMUR 262 Pre-Electrified - - - 123.60079 -10.21685 25406 5371020001 FATUKOA NUSA TENGGARA TIMUR 303 Pre-Electrified - - - 123.60306 -10.23134 25407 5371020001 FATUKOA NUSA TENGGARA TIMUR 505 Pre-Electrified - - - 123.60967 -10.22732 25408 5371020002 SIKUMANA NUSA TENGGARA TIMUR 8 850 Pre-Electrified - - - 123.60577 -10.19871 25409 5371020002 SIKUMANA NUSA TENGGARA TIMUR 198 Pre-Electrified - - - 123.60076 -10.20219 25410 5371020002 SIKUMANA NUSA TENGGARA TIMUR 255 Pre-Electrified - - - 123.60211 -10.19802 25411 5371020002 SIKUMANA NUSA TENGGARA TIMUR 153 Pre-Electrified - - - 123.60383 -10.21310 25412 5371020002 SIKUMANA NUSA TENGGARA TIMUR 431 Pre-Electrified - - - 123.60429 -10.20859 25413 5371020002 SIKUMANA NUSA TENGGARA TIMUR 82 Pre-Electrified - - - 123.60433 -10.21073 25414 5371020002 SIKUMANA NUSA TENGGARA TIMUR 1 022 Pre-Electrified - - - 123.60673 -10.20754 25415 5371020002 SIKUMANA NUSA TENGGARA TIMUR 1 900 Pre-Electrified - - - 123.60977 -10.20600 25416 5371020002 SIKUMANA NUSA TENGGARA TIMUR 304 Pre-Electrified - - - 123.61141 -10.20732 25417 5371020002 SIKUMANA NUSA TENGGARA TIMUR 1 008 Pre-Electrified - - - 123.61428 -10.20628 25418 5371020002 SIKUMANA NUSA TENGGARA TIMUR 575 Pre-Electrified - - - 123.61352 -10.21025 25419 5371020002 SIKUMANA NUSA TENGGARA TIMUR 137 Pre-Electrified - - - 123.61485 -10.21251 25420 5371020003 BELLO NUSA TENGGARA TIMUR 782 Pre-Electrified - - - 123.61802 -10.20140 25421 5371020003 BELLO NUSA TENGGARA TIMUR 158 Pre-Electrified - - - 123.63599 -10.21248 25422 5371020003 BELLO NUSA TENGGARA TIMUR 541 Pre-Electrified - - - 123.63382 -10.21201 25423 5371020003 BELLO NUSA TENGGARA TIMUR 212 Pre-Electrified - - - 123.62743 -10.21555 25424 5371020003 BELLO NUSA TENGGARA TIMUR 1 883 Pre-Electrified - - - 123.62785 -10.21886 25425 5371020004 KOLHUA NUSA TENGGARA TIMUR 96 Pre-Electrified - - - 123.62482 -10.19771 25426 5371020004 KOLHUA NUSA TENGGARA TIMUR 272 Pre-Electrified - - - 123.65579 -10.21159 25427 5371020004 KOLHUA NUSA TENGGARA TIMUR 126 Pre-Electrified - - - 123.65173 -10.20756 25428 5371020004 KOLHUA NUSA TENGGARA TIMUR 1 251 Pre-Electrified - - - 123.64350 -10.21470 25429 5371020004 KOLHUA NUSA TENGGARA TIMUR 234 Pre-Electrified - - - 123.63959 -10.20026 25430 5371020004 KOLHUA NUSA TENGGARA TIMUR 269 Pre-Electrified - - - 123.63840 -10.21271 25431 5371020004 KOLHUA NUSA TENGGARA TIMUR 184 Pre-Electrified - - - 123.63637 -10.21214 25432 5371020004 KOLHUA NUSA TENGGARA TIMUR 209 Pre-Electrified - - - 123.63514 -10.20941 25433 5371020004 KOLHUA NUSA TENGGARA TIMUR 115 Pre-Electrified - - - 123.63318 -10.20373 25434 5371020004 KOLHUA NUSA TENGGARA TIMUR 251 Pre-Electrified - - - 123.63267 -10.20764 25435 5371020004 KOLHUA NUSA TENGGARA TIMUR 68 Pre-Electrified - - - 123.63207 -10.20345 25436 5371020004 KOLHUA NUSA TENGGARA TIMUR 305 Pre-Electrified - - - 123.63218 -10.20584 25437 5371020004 KOLHUA NUSA TENGGARA TIMUR 647 Pre-Electrified - - - 123.63055 -10.20185 25438 5371020004 KOLHUA NUSA TENGGARA TIMUR 413 Pre-Electrified - - - 123.62916 -10.20227 25439 5371020004 KOLHUA NUSA TENGGARA TIMUR 15 Pre-Electrified - - - 123.62676 -10.19579 25440 5371020004 KOLHUA NUSA TENGGARA TIMUR 2 373 Pre-Electrified - - - 123.62599 -10.19892 25441 5371020005 PENFUI NUSA TENGGARA TIMUR 249 Pre-Electrified - - - 123.67609 -10.16650 25442 5371020005 PENFUI NUSA TENGGARA TIMUR 133 Pre-Electrified - - - 123.67374 -10.16613 25443 5371020005 PENFUI NUSA TENGGARA TIMUR 78 Pre-Electrified - - - 123.66639 -10.18175 25444 5371020005 PENFUI NUSA TENGGARA TIMUR 278 Pre-Electrified - - - 123.66417 -10.17945 25445 5371020005 PENFUI NUSA TENGGARA TIMUR 502 Pre-Electrified - - - 123.66597 -10.16592 25446 5371020005 PENFUI NUSA TENGGARA TIMUR 996 Pre-Electrified - - - 123.65806 -10.17654 25447 5371020005 PENFUI NUSA TENGGARA TIMUR 107 Pre-Electrified - - - 123.65549 -10.17958 25448 5371020005 PENFUI NUSA TENGGARA TIMUR 1 129 Pre-Electrified - - - 123.65459 -10.17301 25449 5371020005 PENFUI NUSA TENGGARA TIMUR 1 064 Pre-Electrified - - - 123.65443 -10.17699 25450 5371020006 NAIMATA NUSA TENGGARA TIMUR 39 Pre-Electrified - - - 123.64830 -10.17652 25451 5371020006 NAIMATA NUSA TENGGARA TIMUR 1 100 Pre-Electrified - - - 123.64769 -10.17775 25452 5371020006 NAIMATA NUSA TENGGARA TIMUR 59 Pre-Electrified - - - 123.63562 -10.18819 25453 5371020006 NAIMATA NUSA TENGGARA TIMUR 1 309 Pre-Electrified - - - 123.63940 -10.18522 25454 5371020007 MAULAFA NUSA TENGGARA TIMUR 2 021 Pre-Electrified - - - 123.61427 -10.18537 25455 5371020007 MAULAFA NUSA TENGGARA TIMUR 1 709 Pre-Electrified - - - 123.61553 -10.18138 25456 5371020007 MAULAFA NUSA TENGGARA TIMUR 216 Pre-Electrified - - - 123.61615 -10.18892 25457 5371020007 MAULAFA NUSA TENGGARA TIMUR 648 Pre-Electrified - - - 123.61802 -10.18871 25458 5371020007 MAULAFA NUSA TENGGARA TIMUR 768 Pre-Electrified - - - 123.62028 -10.18512 25459 5371020007 MAULAFA NUSA TENGGARA TIMUR 379 Pre-Electrified - - - 123.62135 -10.18887 25460 5371020007 MAULAFA NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 123.62250 -10.19321 25461 5371020007 MAULAFA NUSA TENGGARA TIMUR 396 Pre-Electrified - - - 123.62438 -10.18900 25462 5371020007 MAULAFA NUSA TENGGARA TIMUR 87 Pre-Electrified - - - 123.62442 -10.19532 25463 5371020007 MAULAFA NUSA TENGGARA TIMUR 106 Pre-Electrified - - - 123.62850 -10.18207 25464 5371020007 MAULAFA NUSA TENGGARA TIMUR 147 Pre-Electrified - - - 123.62631 -10.19531 25465 5371020007 MAULAFA NUSA TENGGARA TIMUR 3 101 Pre-Electrified - - - 123.62603 -10.18931 25466 5371020008 OEPURA NUSA TENGGARA TIMUR 10 518 Pre-Electrified - - - 123.60901 -10.19336 25467 5371020008 OEPURA NUSA TENGGARA TIMUR 109 Pre-Electrified - - - 123.60701 -10.17939 25468 5371020008 OEPURA NUSA TENGGARA TIMUR 574 Pre-Electrified - - - 123.61242 -10.19018 25469 5371020008 OEPURA NUSA TENGGARA TIMUR 280 Pre-Electrified - - - 123.61220 -10.18713 Annex II – Demand forecast results Page 182 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 25470 5371020008 OEPURA NUSA TENGGARA TIMUR 426 Pre-Electrified - - - 123.61488 -10.19371 25471 5371020008 OEPURA NUSA TENGGARA TIMUR 3 Pre-Electrified - - - 123.61497 -10.18966 25472 5371020008 OEPURA NUSA TENGGARA TIMUR 488 Pre-Electrified - - - 123.61617 -10.19087 25473 5371020008 OEPURA NUSA TENGGARA TIMUR 91 Pre-Electrified - - - 123.61701 -10.19229 25474 5371020008 OEPURA NUSA TENGGARA TIMUR 737 Pre-Electrified - - - 123.62041 -10.19071 25475 5371020008 OEPURA NUSA TENGGARA TIMUR 252 Pre-Electrified - - - 123.61886 -10.19599 25476 5371020008 OEPURA NUSA TENGGARA TIMUR 96 Pre-Electrified - - - 123.61937 -10.19409 25477 5371020008 OEPURA NUSA TENGGARA TIMUR 310 Pre-Electrified - - - 123.62126 -10.19333 25478 5371020008 OEPURA NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 123.62402 -10.19528 25479 5371020009 NAIKOLAN NUSA TENGGARA TIMUR 7 507 Pre-Electrified - - - 123.60232 -10.18961 25480 5371030008 OETETE NUSA TENGGARA TIMUR 7 057 Pre-Electrified - - - 123.58901 -10.16557 25481 5371030009 OEBOBO NUSA TENGGARA TIMUR 11 320 Pre-Electrified - - - 123.60011 -10.16920 25482 5371030009 OEBOBO NUSA TENGGARA TIMUR 179 Pre-Electrified - - - 123.60726 -10.17475 25483 5371030010 FATULULI NUSA TENGGARA TIMUR 10 886 Pre-Electrified - - - 123.60406 -10.16570 25484 5371030010 FATULULI NUSA TENGGARA TIMUR 4 579 Pre-Electrified - - - 123.61190 -10.16465 25485 5371030011 OEBUFU NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 123.60744 -10.17910 25486 5371030011 OEBUFU NUSA TENGGARA TIMUR 8 566 Pre-Electrified - - - 123.62036 -10.17467 25487 5371030011 OEBUFU NUSA TENGGARA TIMUR 205 Pre-Electrified - - - 123.61761 -10.17949 25488 5371030011 OEBUFU NUSA TENGGARA TIMUR 283 Pre-Electrified - - - 123.61569 -10.17830 25489 5371030011 OEBUFU NUSA TENGGARA TIMUR 209 Pre-Electrified - - - 123.62423 -10.17249 25490 5371030011 OEBUFU NUSA TENGGARA TIMUR 54 Pre-Electrified - - - 123.63047 -10.17069 25491 5371030011 OEBUFU NUSA TENGGARA TIMUR 189 Pre-Electrified - - - 123.63026 -10.16952 25492 5371030011 OEBUFU NUSA TENGGARA TIMUR 5 Pre-Electrified - - - 123.62505 -10.17122 25493 5371030011 OEBUFU NUSA TENGGARA TIMUR 5 278 Pre-Electrified - - - 123.62706 -10.17567 25494 5371030012 TUAK DAUN MERAH NUSA TENGGARA TIMUR 300 Pre-Electrified - - - 123.63212 -10.16787 25495 5371030012 TUAK DAUN MERAH NUSA TENGGARA TIMUR 1 258 Pre-Electrified - - - 123.63191 -10.16331 25496 5371030012 TUAK DAUN MERAH NUSA TENGGARA TIMUR 154 Pre-Electrified - - - 123.63138 -10.16877 25497 5371030012 TUAK DAUN MERAH NUSA TENGGARA TIMUR 132 Pre-Electrified - - - 123.63133 -10.16716 25498 5371030012 TUAK DAUN MERAH NUSA TENGGARA TIMUR 617 Pre-Electrified - - - 123.63107 -10.15921 25499 5371030012 TUAK DAUN MERAH NUSA TENGGARA TIMUR 7 Pre-Electrified - - - 123.63087 -10.16933 25500 5371030012 TUAK DAUN MERAH NUSA TENGGARA TIMUR 369 Pre-Electrified - - - 123.62986 -10.16698 25501 5371030012 TUAK DAUN MERAH NUSA TENGGARA TIMUR 5 013 Pre-Electrified - - - 123.63145 -10.15700 25502 5371030012 TUAK DAUN MERAH NUSA TENGGARA TIMUR 857 Pre-Electrified - - - 123.62638 -10.16400 25503 5371030013 KAYU PUTIH NUSA TENGGARA TIMUR 8 986 Pre-Electrified - - - 123.62185 -10.16753 25504 5371030013 KAYU PUTIH NUSA TENGGARA TIMUR 729 Pre-Electrified - - - 123.61685 -10.16009 25505 5371030013 KAYU PUTIH NUSA TENGGARA TIMUR 41 Pre-Electrified - - - 123.62339 -10.15686 25506 5371030013 KAYU PUTIH NUSA TENGGARA TIMUR 303 Pre-Electrified - - - 123.62275 -10.15922 25507 5371030013 KAYU PUTIH NUSA TENGGARA TIMUR 53 Pre-Electrified - - - 123.62479 -10.15827 25508 5371030013 KAYU PUTIH NUSA TENGGARA TIMUR 22 Pre-Electrified - - - 123.62486 -10.16437 25509 5371030013 KAYU PUTIH NUSA TENGGARA TIMUR 116 Pre-Electrified - - - 123.62544 -10.16407 25510 5371030013 KAYU PUTIH NUSA TENGGARA TIMUR 79 Pre-Electrified - - - 123.62520 -10.15840 25511 5371030013 KAYU PUTIH NUSA TENGGARA TIMUR 4 Pre-Electrified - - - 123.62522 -10.15634 25512 5371030014 LILIBA NUSA TENGGARA TIMUR 1 183 Pre-Electrified - - - 123.64861 -10.16172 25513 5371030014 LILIBA NUSA TENGGARA TIMUR 2 161 Pre-Electrified - - - 123.64168 -10.17605 25514 5371030014 LILIBA NUSA TENGGARA TIMUR 575 Pre-Electrified - - - 123.64085 -10.16843 25515 5371030014 LILIBA NUSA TENGGARA TIMUR 7 876 Pre-Electrified - - - 123.63687 -10.17754 25516 5371031001 BAKUNASE NUSA TENGGARA TIMUR 25 Pre-Electrified - - - 123.58972 -10.18602 25517 5371031001 BAKUNASE NUSA TENGGARA TIMUR 4 293 Pre-Electrified - - - 123.58464 -10.19194 25518 5371031001 BAKUNASE NUSA TENGGARA TIMUR 194 Pre-Electrified - - - 123.58948 -10.18867 25519 5371031002 BAKUNASE II NUSA TENGGARA TIMUR 5 947 Pre-Electrified - - - 123.59393 -10.19498 25520 5371031002 BAKUNASE II NUSA TENGGARA TIMUR 6 Pre-Electrified - - - 123.59008 -10.18858 25521 5371031002 BAKUNASE II NUSA TENGGARA TIMUR 44 Pre-Electrified - - - 123.59485 -10.19651 25522 5371031003 AIR NONA NUSA TENGGARA TIMUR 4 800 Pre-Electrified - - - 123.58821 -10.17730 25523 5371031003 AIR NONA NUSA TENGGARA TIMUR 1 966 Pre-Electrified - - - 123.58414 -10.18110 25524 5371031003 AIR NONA NUSA TENGGARA TIMUR 32 Pre-Electrified - - - 123.58186 -10.17970 25525 5371031004 NAIKOTEN I NUSA TENGGARA TIMUR 10 569 Pre-Electrified - - - 123.59874 -10.18072 25526 5371031005 NAIKOTEN II NUSA TENGGARA TIMUR 2 871 Pre-Electrified - - - 123.59762 -10.17436 25527 5371031006 KUANINO NUSA TENGGARA TIMUR 7 264 Pre-Electrified - - - 123.59278 -10.17095 25528 5371031007 NUNLEU NUSA TENGGARA TIMUR 5 027 Pre-Electrified - - - 123.58992 -10.17327 25529 5371031008 FONTEIN NUSA TENGGARA TIMUR 4 841 Pre-Electrified - - - 123.58202 -10.16702 25530 5371040011 KELAPA LIMA NUSA TENGGARA TIMUR 4 074 Pre-Electrified - - - 123.61236 -10.15529 25531 5371040011 KELAPA LIMA NUSA TENGGARA TIMUR 1 531 Pre-Electrified - - - 123.61471 -10.14787 25532 5371040011 KELAPA LIMA NUSA TENGGARA TIMUR 160 Pre-Electrified - - - 123.61599 -10.15006 25533 5371040011 KELAPA LIMA NUSA TENGGARA TIMUR 67 Pre-Electrified - - - 123.61674 -10.15497 25534 5371040011 KELAPA LIMA NUSA TENGGARA TIMUR 4 590 Pre-Electrified - - - 123.62142 -10.15284 25535 5371040011 KELAPA LIMA NUSA TENGGARA TIMUR 126 Pre-Electrified - - - 123.61890 -10.14352 25536 5371040011 KELAPA LIMA NUSA TENGGARA TIMUR 234 Pre-Electrified - - - 123.62088 -10.14335 25537 5371040011 KELAPA LIMA NUSA TENGGARA TIMUR 63 Pre-Electrified - - - 123.62063 -10.14847 25538 5371040011 KELAPA LIMA NUSA TENGGARA TIMUR 1 136 Pre-Electrified - - - 123.62208 -10.14813 25539 5371040011 KELAPA LIMA NUSA TENGGARA TIMUR 3 Pre-Electrified - - - 123.62532 -10.15019 25540 5371040011 KELAPA LIMA NUSA TENGGARA TIMUR 1 854 Pre-Electrified - - - 123.62806 -10.15320 25541 5371040012 OESAPA NUSA TENGGARA TIMUR 22 658 Pre-Electrified - - - 123.65878 -10.14572 25542 5371040012 OESAPA NUSA TENGGARA TIMUR 247 Pre-Electrified - - - 123.64197 -10.14971 25543 5371040012 OESAPA NUSA TENGGARA TIMUR 190 Pre-Electrified - - - 123.64103 -10.14851 25544 5371040012 OESAPA NUSA TENGGARA TIMUR 168 Pre-Electrified - - - 123.64051 -10.15217 25545 5371040012 OESAPA NUSA TENGGARA TIMUR 6 Pre-Electrified - - - 123.63805 -10.14911 25546 5371040013 OESAPA BARAT NUSA TENGGARA TIMUR 971 Pre-Electrified - - - 123.62404 -10.14910 25547 5371040013 OESAPA BARAT NUSA TENGGARA TIMUR 30 Pre-Electrified - - - 123.62485 -10.14584 25548 5371040013 OESAPA BARAT NUSA TENGGARA TIMUR 32 Pre-Electrified - - - 123.62515 -10.14587 25549 5371040013 OESAPA BARAT NUSA TENGGARA TIMUR 86 Pre-Electrified - - - 123.63585 -10.14658 25550 5371040013 OESAPA BARAT NUSA TENGGARA TIMUR 142 Pre-Electrified - - - 123.63512 -10.15411 25551 5371040013 OESAPA BARAT NUSA TENGGARA TIMUR 1 342 Pre-Electrified - - - 123.63089 -10.15466 25552 5371040013 OESAPA BARAT NUSA TENGGARA TIMUR 6 498 Pre-Electrified - - - 123.62827 -10.14552 25553 5371040013 OESAPA BARAT NUSA TENGGARA TIMUR 103 Pre-Electrified - - - 123.62820 -10.15508 25554 5371040014 OESAPA SELATAN NUSA TENGGARA TIMUR 553 Pre-Electrified - - - 123.65239 -10.15722 Annex II – Demand forecast results Page 183 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 25555 5371040014 OESAPA SELATAN NUSA TENGGARA TIMUR 741 Pre-Electrified - - - 123.65029 -10.15800 25556 5371040014 OESAPA SELATAN NUSA TENGGARA TIMUR 837 Pre-Electrified - - - 123.64933 -10.16166 25557 5371040014 OESAPA SELATAN NUSA TENGGARA TIMUR 1 449 Pre-Electrified - - - 123.64206 -10.15757 25558 5371040015 LASIANA NUSA TENGGARA TIMUR 393 Pre-Electrified - - - 123.67809 -10.14034 25559 5371040015 LASIANA NUSA TENGGARA TIMUR 64 Pre-Electrified - - - 123.67498 -10.14477 25560 5371040015 LASIANA NUSA TENGGARA TIMUR 552 Pre-Electrified - - - 123.67452 -10.13816 25561 5371040015 LASIANA NUSA TENGGARA TIMUR 609 Pre-Electrified - - - 123.67389 -10.14322 25562 5371040015 LASIANA NUSA TENGGARA TIMUR 154 Pre-Electrified - - - 123.67381 -10.14146 25563 5371040015 LASIANA NUSA TENGGARA TIMUR 183 Pre-Electrified - - - 123.67040 -10.14307 25564 5371040015 LASIANA NUSA TENGGARA TIMUR 84 Pre-Electrified - - - 123.66897 -10.13943 25565 5371040015 LASIANA NUSA TENGGARA TIMUR 218 Pre-Electrified - - - 123.66797 -10.14331 25566 5371040015 LASIANA NUSA TENGGARA TIMUR 5 054 Pre-Electrified - - - 123.66692 -10.13701 25567 5371040015 LASIANA NUSA TENGGARA TIMUR 17 Pre-Electrified - - - 123.66500 -10.15725 25568 5371040015 LASIANA NUSA TENGGARA TIMUR 4 194 Pre-Electrified - - - 123.66398 -10.14085 25569 5371041001 AIR MATA NUSA TENGGARA TIMUR 1 613 Pre-Electrified - - - 123.57829 -10.16691 25570 5371041002 LAHILAI BISSI KOPAN NUSA TENGGARA TIMUR 593 Pre-Electrified - - - 123.57739 -10.16248 25571 5371041003 BONIPOI NUSA TENGGARA TIMUR 1 784 Pre-Electrified - - - 123.57987 -10.16181 25572 5371041004 MERDEKA NUSA TENGGARA TIMUR 2 215 Pre-Electrified - - - 123.58544 -10.16152 25573 5371041005 SOLOR NUSA TENGGARA TIMUR 2 777 Pre-Electrified - - - 123.58199 -10.15952 25574 5371041006 TODEKISAR NUSA TENGGARA TIMUR 1 105 Pre-Electrified - - - 123.58494 -10.15792 25575 5371041007 OEBA NUSA TENGGARA TIMUR 4 894 Pre-Electrified - - - 123.59515 -10.16094 25576 5371041008 FATUBESI NUSA TENGGARA TIMUR 4 577 Pre-Electrified - - - 123.59292 -10.15551 25577 5371041009 NEFONAEK NUSA TENGGARA TIMUR 3 751 Pre-Electrified - - - 123.60252 -10.15666 25578 5371041010 PASIR PANJANG NUSA TENGGARA TIMUR 6 887 Pre-Electrified - - - 123.59877 -10.15498 25579 8101040009 SAUMLAKI MALUKU 9 296 Pre-Electrified - - - 131.30663 -7.96680 25580 8101040010 OLILIT MALUKU 5 721 Pre-Electrified - - - 131.29958 -7.98040 25581 8101040011 SIFNANA MALUKU 2 700 Pre-Electrified - - - 131.30810 -7.96293 25582 8101040013 KABIARAT RAYA MALUKU 886 Pre-Electrified - - - 131.34026 -7.90909 25583 8101040014 ILNGEI MALUKU 27 Pre-Electrified - - - 131.34241 -7.90514 25584 8101040016 MATAKUS MALUKU 431 MiniGrid Systems 98 100 548 19.0 131.21247 -8.05127 25585 8101041001 TUMBUR MALUKU 1 112 Pre-Electrified - - - 131.36402 -7.86725 25586 8101041002 LORULUN MALUKU 318 Pre-Electrified - - - 131.35038 -7.83542 25587 8101041003 ATUBUL RAYA MALUKU 2 163 Pre-Electrified - - - 131.42940 -7.81454 25588 8101041005 AMDASA MALUKU 579 Pre-Electrified - - - 131.47700 -7.77059 25589 8101041005 AMDASA MALUKU 1 168 Pre-Electrified - - - 131.43153 -7.76376 25590 8101041006 SANGLIAT DOL MALUKU 869 Pre-Electrified - - - 131.48140 -7.75885 25591 8101041007 SANGLIAT KRAWAIN MALUKU 837 Pre-Electrified - - - 131.47707 -7.74481 25592 8101041008 ARUI BAB MALUKU 2 332 Pre-Electrified - - - 131.51952 -7.72473 25593 8101042006 WERATAN MALUKU 1 660 MiniGrid Systems 57 58 482 11.1 131.08662 -7.65778 25594 8101042007 THEMIN MALUKU 702 Pre-Electrified - - - 131.03640 -7.66235 25595 8101042008 WELUTU MALUKU 702 Pre-Electrified - - - 131.03515 -7.66366 25596 8101042009 RUMAH SALUT MALUKU 1 548 Pre-Electrified - - - 131.03367 -7.66531 25597 8101042010 KAMATUBUN MALUKU 2 194 Pre-Electrified - - - 131.03121 -7.66622 25598 8101043001 WERAIN MALUKU 307 Pre-Electrified - - - 130.77887 -8.33568 25599 8101043001 WERAIN MALUKU 73 Pre-Electrified - - - 130.77786 -8.33585 25600 8101043001 WERAIN MALUKU 752 Pre-Electrified - - - 130.80168 -8.28924 25601 8101043002 FURSUI MALUKU 960 Pre-Electrified - - - 130.82225 -8.32507 25602 8101043003 LINGAT MALUKU 1 109 Pre-Electrified - - - 130.88161 -8.25095 25603 8101043003 LINGAT MALUKU 835 Pre-Electrified - - - 130.88189 -8.24907 25604 8101043004 KANDAR MALUKU 1 573 Pre-Electrified - - - 131.00418 -8.18753 25605 8101043006 ADAUT MALUKU 4 476 Pre-Electrified - - - 131.11392 -8.13138 25606 8101043006 ADAUT MALUKU 91 MiniGrid Systems 23 23 598 4.5 131.14676 -8.13728 25607 8101050023 RITABEL MALUKU 147 MiniGrid Systems 35 35 910 6.8 131.60681 -7.12699 25608 8101050023 RITABEL MALUKU 3 325 Pre-Electrified - - - 131.71753 -7.15446 25609 8101050024 RIDOOL MALUKU 1 493 Pre-Electrified - - - 131.71715 -7.15088 25610 8101050025 WAITIDAL MALUKU 1 561 Pre-Electrified - - - 131.72888 -7.12911 25611 8101050026 KELIOBER MALUKU 1 642 Pre-Electrified - - - 131.85592 -7.11362 25612 8101050027 LAMDESAR TIMUR MALUKU 1 624 Pre-Electrified - - - 131.97544 -7.21161 25613 8101050029 KELAAN MALUKU 682 Pre-Electrified - - - 131.91610 -7.10387 25614 8101052003 LABOBAR MALUKU 450 MiniGrid Systems 75 76 950 14.6 131.40213 -7.22672 25615 8101052003 LABOBAR MALUKU 482 MiniGrid Systems 80 82 080 15.5 131.44381 -7.09855 25616 8101052013 LINGADA MALUKU 226 MiniGrid Systems 68 69 768 13.2 131.29229 -7.32688 25617 8101052013 LINGADA MALUKU 199 MiniGrid Systems 59 60 534 11.4 131.25900 -7.31211 25618 8101055005 ADODOMOLO MALUKU 79 MiniGrid Systems 20 20 520 3.9 131.59074 -6.67369 25619 8102010014 WARWUT MALUKU 427 Pre-Electrified - - - 132.72828 -5.85083 25620 8102010018 WAB MALUKU 452 Pre-Electrified - - - 132.69044 -5.80691 25621 8102010018 WAB MALUKU 1 427 Pre-Electrified - - - 132.68245 -5.79801 25622 8102010018 WAB MALUKU 199 Pre-Electrified - - - 132.67097 -5.77890 25623 8102010019 EVU MALUKU 547 Pre-Electrified - - - 132.70332 -5.78768 25624 8102010025 NGABUB MALUKU 456 Pre-Electrified - - - 132.75217 -5.78476 25625 8102010026 IBRA MALUKU 576 Pre-Electrified - - - 132.77118 -5.76637 25626 8102010027 LETVUAN MALUKU 1 166 Pre-Electrified - - - 132.70107 -5.76289 25627 8102010028 TETOAT MALUKU 247 Pre-Electrified - - - 132.67072 -5.77713 25628 8102010028 TETOAT MALUKU 179 Pre-Electrified - - - 132.67063 -5.77359 25629 8102010028 TETOAT MALUKU 97 Pre-Electrified - - - 132.67516 -5.75927 25630 8102010028 TETOAT MALUKU 101 Pre-Electrified - - - 132.67430 -5.75317 25631 8102010028 TETOAT MALUKU 214 Pre-Electrified - - - 132.68225 -5.75129 25632 8102010028 TETOAT MALUKU 114 Pre-Electrified - - - 132.68590 -5.75055 25633 8102010029 DIAN MALUKU 538 Pre-Electrified - - - 132.69486 -5.74952 25634 8102010029 DIAN MALUKU 1 489 Pre-Electrified - - - 132.68570 -5.74042 25635 8102010030 SATHEAN MALUKU 1 766 Pre-Electrified - - - 132.74871 -5.72108 25636 8102010031 RUMADIAN MALUKU 398 Pre-Electrified - - - 132.68574 -5.71240 25637 8102010033 NAMAR MALUKU 1 230 Pre-Electrified - - - 132.65480 -5.69771 25638 8102010035 FAAN MALUKU 925 Pre-Electrified - - - 132.73614 -5.68742 25639 8102010035 FAAN MALUKU 743 Pre-Electrified - - - 132.73184 -5.67264 Annex II – Demand forecast results Page 184 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 25640 8102010036 LANGGUR MALUKU 9 725 Pre-Electrified - - - 132.73548 -5.66745 25641 8102010037 KEL. OHOIJANG WATDEK MALUKU 9 061 Pre-Electrified - - - 132.73653 -5.65057 25642 8102010038 KOLSER MALUKU 1 105 Pre-Electrified - - - 132.73026 -5.64978 25643 8102010039 KELANIT MALUKU 240 Pre-Electrified - - - 132.69271 -5.65996 25644 8102010039 KELANIT MALUKU 929 Pre-Electrified - - - 132.68974 -5.65205 25645 8102010040 NGILNGOF MALUKU 711 Pre-Electrified - - - 132.64417 -5.67315 25646 8102010040 NGILNGOF MALUKU 354 Pre-Electrified - - - 132.63691 -5.66647 25647 8102010041 OHOILILIR MALUKU 154 Pre-Electrified - - - 132.63695 -5.66325 25648 8102010041 OHOILILIR MALUKU 119 Pre-Electrified - - - 132.63967 -5.65306 25649 8102010042 OHOIDERTAWUN MALUKU 272 Pre-Electrified - - - 132.67765 -5.62987 25650 8102010043 LETMAN MALUKU 1 351 Pre-Electrified - - - 132.70940 -5.62133 25651 8102012001 OHOIDERTUTU MALUKU 1 470 Pre-Electrified - - - 132.70761 -5.93418 25652 8102012002 MADWAER MALUKU 272 Pre-Electrified - - - 132.67709 -5.90215 25653 8102012003 SOMLAIN MALUKU 593 Pre-Electrified - - - 132.68403 -5.84999 25654 8102012004 OHOIREN MALUKU 544 Pre-Electrified - - - 132.68577 -5.84523 25655 8102012007 TANIMBAR KEI MALUKU 456 MiniGrid Systems 113 115 938 21.9 132.46591 -6.01840 25656 8102013001 OHOISEB MALUKU 1 157 Pre-Electrified - - - 132.74893 -5.94575 25657 8102013003 LUMEFAR MALUKU 258 Pre-Electrified - - - 132.78109 -5.93173 25658 8102013004 NGURSOIN MALUKU 381 Pre-Electrified - - - 132.78383 -5.92667 25659 8102013005 ELAAR LAMAGORANG MALUKU 500 Pre-Electrified - - - 132.78855 -5.90815 25660 8102013006 ELAAR LET MALUKU 281 Pre-Electrified - - - 132.79109 -5.89655 25661 8102013006 ELAAR LET MALUKU 533 Pre-Electrified - - - 132.79229 -5.88787 25662 8102013007 MASTUR MALUKU 288 Pre-Electrified - - - 132.79465 -5.88226 25663 8102013007 MASTUR MALUKU 862 Pre-Electrified - - - 132.79623 -5.86781 25664 8102013007 MASTUR MALUKU 906 Pre-Electrified - - - 132.80251 -5.85883 25665 8102013008 OHOINOL MALUKU 385 Pre-Electrified - - - 132.75507 -5.87283 25666 8102013009 WAIN MALUKU 1 603 Pre-Electrified - - - 132.77702 -5.80825 25667 8102013009 WAIN MALUKU 514 Pre-Electrified - - - 132.78302 -5.77831 25668 8102013010 ABEAN MALUKU 663 Pre-Electrified - - - 132.80784 -5.85444 25669 8102013010 ABEAN MALUKU 197 Pre-Electrified - - - 132.81125 -5.83525 25670 8102013011 RAAT MALUKU 15 Pre-Electrified - - - 132.81099 -5.83332 25671 8102013011 RAAT MALUKU 125 Pre-Electrified - - - 132.80946 -5.82629 25672 8102013013 REWAV MALUKU 624 Pre-Electrified - - - 132.80389 -5.79163 25673 8102020015 OHOIWAIT MALUKU 258 Pre-Electrified - - - 132.95775 -5.75403 25674 8102020016 OHOIEL MALUKU 1 246 Pre-Electrified - - - 132.98016 -5.70039 25675 8102020017 WERKA MALUKU 242 Pre-Electrified - - - 132.94546 -5.68417 25676 8102020020 WAUR MALUKU 1 241 Pre-Electrified - - - 132.98592 -5.68233 25677 8102020021 NGEFUIT MALUKU 616 Pre-Electrified - - - 132.98316 -5.68965 25678 8102020022 WAURTAHAIT MALUKU 394 Pre-Electrified - - - 132.99538 -5.67906 25679 8102020023 YAMTEL MALUKU 673 Pre-Electrified - - - 132.99552 -5.67727 25680 8102020024 OHOINANGAN MALUKU 782 Pre-Electrified - - - 132.98753 -5.67063 25681 8102020025 ELAT MALUKU 618 Pre-Electrified - - - 132.99191 -5.65484 25682 8102020025 ELAT MALUKU 836 Pre-Electrified - - - 132.99673 -5.65346 25683 8102020026 DEPUR MALUKU 49 Pre-Electrified - - - 132.99905 -5.65256 25684 8102020026 DEPUR MALUKU 958 Pre-Electrified - - - 133.00256 -5.65180 25685 8102020026 DEPUR MALUKU 270 Pre-Electrified - - - 133.00578 -5.64719 25686 8102020027 OHOILIM MALUKU - Pre-Electrified - - - 133.00480 -5.65144 25687 8102020027 OHOILIM MALUKU 777 Pre-Electrified - - - 133.00664 -5.64900 25688 8102020030 ELRALANG MALUKU 111 Pre-Electrified - - - 133.00615 -5.64606 25689 8102020030 ELRALANG MALUKU 425 Pre-Electrified - - - 133.00878 -5.63732 25690 8102020030 ELRALANG MALUKU 604 Pre-Electrified - - - 133.01020 -5.62999 25691 8102020030 ELRALANG MALUKU 504 Pre-Electrified - - - 133.01498 -5.61370 25692 8102020030 ELRALANG MALUKU 883 Pre-Electrified - - - 133.01777 -5.60479 25693 8102020030 ELRALANG MALUKU 340 Pre-Electrified - - - 133.01493 -5.59487 25694 8102020030 ELRALANG MALUKU 227 Pre-Electrified - - - 133.02246 -5.57426 25695 8102020030 ELRALANG MALUKU 509 Pre-Electrified - - - 133.03004 -5.56343 25696 8102020031 WEER OHOINAM MALUKU 215 Pre-Electrified - - - 133.02992 -5.56118 25697 8102020031 WEER OHOINAM MALUKU 732 Pre-Electrified - - - 133.04319 -5.52491 25698 8102020034 FAA MALUKU 479 Pre-Electrified - - - 133.04483 -5.52132 25699 8102020034 FAA MALUKU 638 Pre-Electrified - - - 133.04503 -5.51707 25700 8102020034 FAA MALUKU 305 Pre-Electrified - - - 133.04627 -5.50603 25701 8102020034 FAA MALUKU 278 Pre-Electrified - - - 133.04885 -5.49540 25702 8102020035 UWAT MALUKU 526 Pre-Electrified - - - 133.05020 -5.49353 25703 8102020041 AD WEARAUR MALUKU 270 MiniGrid Systems 53 54 378 10.3 133.11084 -5.30529 25704 8102022003 FEER MALUKU - Pre-Electrified - - - 132.86088 -5.95908 25705 8102022003 FEER MALUKU 3 OffGrid Systems 1 1 026 0.2 132.88920 -5.88980 25706 8102022003 FEER MALUKU 38 MiniGrid Systems 11 11 286 2.1 132.87717 -5.87560 25707 8102022010 WEDUAR MALUKU 860 Pre-Electrified - - - 132.94138 -5.82474 25708 8102022011 TAMANGIL NUHUTEN MALUKU 282 Pre-Electrified - - - 132.90494 -5.82470 25709 8102022012 LARAT MALUKU 510 Pre-Electrified - - - 132.91002 -5.80445 25710 8102022013 NERONG MALUKU 293 Pre-Electrified - - - 132.93334 -5.77973 25711 8102022014 OHOIRENAN MALUKU 849 Pre-Electrified - - - 132.95042 -5.77924 25712 8102022014 OHOIRENAN MALUKU 174 Pre-Electrified - - - 132.95642 -5.75711 25713 8103010003 LONTHOR MALUKU 4 247 Pre-Electrified - - - 129.90861 -4.55576 25714 8103010004 PULAU HATTA MALUKU 467 MiniGrid Systems 118 121 068 22.9 130.03938 -4.59218 25715 8103010005 SELAMON MALUKU 2 184 Pre-Electrified - - - 129.94136 -4.53231 25716 8103010006 KAMPUNG BARU MALUKU 2 924 Pre-Electrified - - - 129.90575 -4.52027 25717 8103010007 DWI WARNA MALUKU 892 Pre-Electrified - - - 129.90249 -4.52714 25718 8103010008 RAJAWALI MALUKU 657 Pre-Electrified - - - 129.90220 -4.51149 25719 8103010009 MERDEKA MALUKU 743 Pre-Electrified - - - 129.89991 -4.51198 25720 8103010011 WAER MALUKU 1 165 Pre-Electrified - - - 129.94959 -4.54681 25721 8103010012 TANAH RATA MALUKU 790 Pre-Electrified - - - 129.90367 -4.51253 25722 8103040002 HAYA MALUKU 1 129 Pre-Electrified - - - 129.31903 -3.41260 25723 8103040002 HAYA MALUKU 2 137 Pre-Electrified - - - 129.55372 -3.46169 25724 8103040003 TEHORU MALUKU 235 Pre-Electrified - - - 129.56365 -3.41444 Annex II – Demand forecast results Page 185 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 25725 8103040003 TEHORU MALUKU 613 Pre-Electrified - - - 129.55307 -3.39031 25726 8103040003 TEHORU MALUKU 5 059 Pre-Electrified - - - 129.54528 -3.37886 25727 8103041005 LAIMU MALUKU 1 438 Pre-Electrified - - - 129.77264 -3.32617 25728 8103041005 LAIMU MALUKU 4 232 Pre-Electrified - - - 129.78033 -3.32631 25729 8103041006 HUNISI MALUKU 509 Pre-Electrified - - - 129.78508 -3.32619 25730 8103041007 YAMALATU MALUKU 395 Pre-Electrified - - - 129.80399 -3.32035 25731 8103041008 LAHA MALUKU 425 Pre-Electrified - - - 129.81505 -3.32133 25732 8103041009 LAHAKABA MALUKU 335 Pre-Electrified - - - 129.82465 -3.32991 25733 8103041009 LAHAKABA MALUKU 870 Pre-Electrified - - - 129.81967 -3.32483 25734 8103041010 ULAHAHAN MALUKU 312 Pre-Electrified - - - 129.83449 -3.32942 25735 8103041010 ULAHAHAN MALUKU 310 Pre-Electrified - - - 129.84251 -3.32888 25736 8103050010 YAFILA MALUKU 665 Pre-Electrified - - - 129.06428 -3.22468 25737 8103050012 MAKARIKI MALUKU 1 724 Pre-Electrified - - - 128.97446 -3.25583 25738 8103050013 SEHATI MALUKU 95 Pre-Electrified - - - 128.97389 -3.27871 25739 8103050013 SEHATI MALUKU 536 Pre-Electrified - - - 128.97373 -3.27076 25740 8103050013 SEHATI MALUKU 51 Pre-Electrified - - - 128.97141 -3.26615 25741 8103050014 HARURU MALUKU 5 999 Pre-Electrified - - - 128.97197 -3.28742 25742 8103050020 AMAHAI MALUKU 3 491 Pre-Electrified - - - 128.92654 -3.34089 25743 8103050021 SOAHUKU MALUKU 4 316 Pre-Electrified - - - 128.92688 -3.34360 25744 8103050022 RUTAH MALUKU 1 551 Pre-Electrified - - - 128.97638 -3.35990 25745 8103050022 RUTAH MALUKU 452 Pre-Electrified - - - 128.99359 -3.35415 25746 8103050022 RUTAH MALUKU 706 Pre-Electrified - - - 129.02208 -3.35228 25747 8103050023 SEPA MALUKU 2 680 Pre-Electrified - - - 129.11126 -3.34957 25748 8103050023 SEPA MALUKU 310 Pre-Electrified - - - 129.08058 -3.34184 25749 8103050024 TAMILOUW MALUKU 832 Pre-Electrified - - - 129.23024 -3.39884 25750 8103050024 TAMILOUW MALUKU 2 025 Pre-Electrified - - - 129.22010 -3.39485 25751 8103050024 TAMILOUW MALUKU 2 687 Pre-Electrified - - - 129.19725 -3.38583 25752 8103050024 TAMILOUW MALUKU 1 420 Pre-Electrified - - - 129.28216 -3.41108 25753 8103050026 YAINUELO MALUKU 2 360 Pre-Electrified - - - 129.05449 -3.34652 25754 8103050027 NUWELETETU MALUKU 503 Pre-Electrified - - - 128.98878 -3.17312 25755 8103050027 NUWELETETU MALUKU 372 Pre-Electrified - - - 128.99072 -3.16436 25756 8103051001 LETWARU MALUKU 4 824 Pre-Electrified - - - 128.96654 -3.29952 25757 8103051002 LESANE MALUKU 4 129 Pre-Electrified - - - 128.96204 -3.29766 25758 8103051003 AMPERA MALUKU 5 541 Pre-Electrified - - - 128.94931 -3.30387 25759 8103051004 NAMAELO MALUKU 11 796 Pre-Electrified - - - 128.95782 -3.30439 25760 8103051005 NAMASINA MALUKU 3 435 Pre-Electrified - - - 128.94572 -3.30810 25761 8103052006 TANANAHU MALUKU 486 Pre-Electrified - - - 128.84446 -3.23304 25762 8103052006 TANANAHU MALUKU 111 MiniGrid Systems 16 16 416 3.1 128.83352 -3.22441 25763 8103052006 TANANAHU MALUKU 1 264 Pre-Electrified - - - 128.85320 -3.21998 25764 8103052006 TANANAHU MALUKU 663 Pre-Electrified - - - 128.87437 -3.20532 25765 8103052006 TANANAHU MALUKU 333 Pre-Electrified - - - 128.88544 -3.20113 25766 8103052006 TANANAHU MALUKU 239 Pre-Electrified - - - 128.85756 -3.19268 25767 8103052007 WARAKA MALUKU 820 Pre-Electrified - - - 128.90307 -3.20119 25768 8103052007 WARAKA MALUKU 81 Pre-Electrified - - - 128.99063 -3.16287 25769 8103060001 USLIAPAN MALUKU 117 Pre-Electrified - - - 128.98016 -3.21176 25770 8103060002 KURALELE MALUKU 458 Pre-Electrified - - - 128.98288 -3.21483 25771 8103060003 KOKROMAN MALUKU 368 Pre-Electrified - - - 128.98849 -3.21880 25772 8103060004 MESA MALUKU 757 Pre-Electrified - - - 128.99637 -3.21837 25773 8103060005 AMETH MALUKU 336 Pre-Electrified - - - 128.99855 -3.21392 25774 8103060005 AMETH MALUKU 183 Pre-Electrified - - - 129.00039 -3.21517 25775 8103060006 BUMEY MALUKU 643 Pre-Electrified - - - 129.01874 -3.20670 25776 8103060007 SIFLURU MALUKU 597 Pre-Electrified - - - 129.01728 -3.21682 25777 8103060007 SIFLURU MALUKU 7 Pre-Electrified - - - 129.02014 -3.20866 25778 8103060009 ISU MALUKU 912 Pre-Electrified - - - 129.03026 -3.22559 25779 8103060010 WATLUDAN MALUKU 1 046 Pre-Electrified - - - 129.03938 -3.22778 25780 8103060011 TRANA MALUKU 556 Pre-Electrified - - - 129.04577 -3.22285 25781 8103060012 JERILI MALUKU 128 Pre-Electrified - - - 129.06355 -3.22565 25782 8103060014 LAYENI MALUKU 225 Pre-Electrified - - - 129.02610 -3.21963 25783 8103060014 LAYENI MALUKU 152 Pre-Electrified - - - 129.02907 -3.20760 25784 8103060014 LAYENI MALUKU 1 671 Pre-Electrified - - - 129.02192 -3.20659 25785 8103060015 UPT TONETANAH MALUKU 180 Pre-Electrified - - - 129.00341 -3.19855 25786 8103060016 WARU MALUKU 1 Pre-Electrified - - - 128.99678 -3.21252 25787 8103060016 WARU MALUKU 1 061 Pre-Electrified - - - 129.00780 -3.20375 25788 8103060017 NAKUPIA MALUKU 358 Pre-Electrified - - - 128.97806 -3.19996 25789 8103060017 NAKUPIA MALUKU 116 Pre-Electrified - - - 128.98868 -3.17594 25790 8103080008 OUW MALUKU 1 451 Pre-Electrified - - - 128.72072 -3.60758 25791 8103080009 ULLATH MALUKU 943 Pre-Electrified - - - 128.71714 -3.60482 25792 8103080009 ULLATH MALUKU 105 Pre-Electrified - - - 128.70645 -3.59735 25793 8103080010 SIRI SORI MALUKU 754 Pre-Electrified - - - 128.70392 -3.59255 25794 8103080010 SIRI SORI MALUKU 890 Pre-Electrified - - - 128.69832 -3.58626 25795 8103080011 SIRI-SORI AMALATU MALUKU 1 968 Pre-Electrified - - - 128.64579 -3.53008 25796 8103080012 SAPARUA MALUKU 67 Pre-Electrified - - - 128.67565 -3.57619 25797 8103080012 SAPARUA MALUKU 2 594 Pre-Electrified - - - 128.66084 -3.57211 25798 8103080013 TIOUW MALUKU 1 467 Pre-Electrified - - - 128.65170 -3.57240 25799 8103080014 PAPERU MALUKU 1 307 Pre-Electrified - - - 128.65759 -3.59039 25800 8103080014 PAPERU MALUKU 1 Pre-Electrified - - - 128.65085 -3.57882 25801 8103080015 BOOI MALUKU 519 Pre-Electrified - - - 128.66214 -3.61075 25802 8103080016 HARIA MALUKU 6 161 Pre-Electrified - - - 128.62126 -3.58250 25803 8103080017 PORTHO MALUKU 2 588 Pre-Electrified - - - 128.61771 -3.58142 25804 8103080018 KULUR MALUKU 994 Pre-Electrified - - - 128.56640 -3.50349 25805 8103080020 IHAMAHU MALUKU 865 Pre-Electrified - - - 128.69036 -3.52778 25806 8103080020 IHAMAHU MALUKU 567 Pre-Electrified - - - 128.69032 -3.51422 25807 8103080021 IHA MALUKU 526 Pre-Electrified - - - 128.69127 -3.50914 25808 8103080021 IHA MALUKU 67 Pre-Electrified - - - 129.08220 -3.34094 25809 8103080022 NOLOTH MALUKU 170 Pre-Electrified - - - 128.69299 -3.50435 Annex II – Demand forecast results Page 186 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 25810 8103080022 NOLOTH MALUKU 521 Pre-Electrified - - - 128.69484 -3.50063 25811 8103080022 NOLOTH MALUKU 2 179 Pre-Electrified - - - 128.69966 -3.49769 25812 8103080024 MAHU MALUKU 634 Pre-Electrified - - - 128.69093 -3.53484 25813 8103081001 TITAWAAI MALUKU 5 OffGrid Systems 2 2 052 0.4 128.78659 -3.69298 25814 8103081001 TITAWAAI MALUKU 548 Pre-Electrified - - - 128.76247 -3.67632 25815 8103081003 AKOON MALUKU 631 Pre-Electrified - - - 128.80981 -3.67374 25816 8103081004 AMETH MALUKU 1 485 Pre-Electrified - - - 128.80531 -3.65134 25817 8103081005 NALAHIA MALUKU 449 Pre-Electrified - - - 128.77889 -3.64793 25818 8103081006 SILA MALUKU 318 Pre-Electrified - - - 128.76460 -3.64648 25819 8103081007 LEINITU MALUKU 128 Pre-Electrified - - - 128.76188 -3.67454 25820 8103081007 LEINITU MALUKU 185 Pre-Electrified - - - 128.76207 -3.64790 25821 8103090001 HARUKU MALUKU 1 482 Pre-Electrified - - - 128.41848 -3.60385 25822 8103090001 HARUKU MALUKU 724 Pre-Electrified - - - 128.41573 -3.59572 25823 8103090002 OMA MALUKU 2 200 Pre-Electrified - - - 128.44075 -3.62647 25824 8103090003 WASSU MALUKU 743 Pre-Electrified - - - 128.49324 -3.61921 25825 8103090004 ABORU MALUKU 2 217 Pre-Electrified - - - 128.51183 -3.60481 25826 8103090005 HULALIU MALUKU 1 676 Pre-Electrified - - - 128.55344 -3.54364 25827 8103090006 KARIUW MALUKU 1 Pre-Electrified - - - 128.49226 -3.52275 25828 8103090006 KARIUW MALUKU 1 085 Pre-Electrified - - - 128.48355 -3.52044 25829 8103090007 PELAUW MALUKU 211 Pre-Electrified - - - 128.49352 -3.52223 25830 8103090007 PELAUW MALUKU 21 Pre-Electrified - - - 128.43486 -3.52048 25831 8103090007 PELAUW MALUKU 209 Pre-Electrified - - - 128.44178 -3.51764 25832 8103090007 PELAUW MALUKU 7 070 Pre-Electrified - - - 128.47132 -3.51916 25833 8103090007 PELAUW MALUKU 304 Pre-Electrified - - - 128.51922 -3.52533 25834 8103090008 KAILOLO MALUKU 58 Pre-Electrified - - - 128.41949 -3.54565 25835 8103090008 KAILOLO MALUKU 3 341 Pre-Electrified - - - 128.41646 -3.53529 25836 8103090009 KABAU MALUKU 2 250 Pre-Electrified - - - 128.42233 -3.55084 25837 8103090010 ROHOMONI MALUKU 2 694 Pre-Electrified - - - 128.42106 -3.55466 25838 8103090011 SAMETH MALUKU 808 Pre-Electrified - - - 128.41782 -3.60270 25839 8103100001 SULI MALUKU 3 465 Pre-Electrified - - - 128.27583 -3.61482 25840 8103100001 SULI MALUKU 7 268 Pre-Electrified - - - 128.28952 -3.62094 25841 8103100002 TIAL MALUKU 2 674 Pre-Electrified - - - 128.33345 -3.63344 25842 8103100003 TENGAH-TENGAH MALUKU 2 433 Pre-Electrified - - - 128.35572 -3.61302 25843 8103100004 TULEHU MALUKU 17 323 Pre-Electrified - - - 128.34046 -3.59110 25844 8103100005 WAAI MALUKU 520 Pre-Electrified - - - 128.32482 -3.57754 25845 8103100005 WAAI MALUKU 2 523 Pre-Electrified - - - 128.32101 -3.56664 25846 8103100005 WAAI MALUKU 1 004 Pre-Electrified - - - 128.33389 -3.54689 25847 8103100005 WAAI MALUKU 1 341 Pre-Electrified - - - 128.33290 -3.53736 25848 8103100006 LIANG MALUKU 1 369 Pre-Electrified - - - 128.34305 -3.51392 25849 8103100006 LIANG MALUKU 1 666 Pre-Electrified - - - 128.33047 -3.50769 25850 8103100006 LIANG MALUKU 3 949 Pre-Electrified - - - 128.31957 -3.50839 25851 8103110004 ASILULU MALUKU 4 076 Pre-Electrified - - - 127.93201 -3.68042 25852 8103110005 URENG MALUKU 790 Pre-Electrified - - - 127.93782 -3.67563 25853 8103110005 URENG MALUKU 3 223 Pre-Electrified - - - 127.95215 -3.66588 25854 8103110005 URENG MALUKU 23 MiniGrid Systems 5 5 130 1.0 127.92127 -3.54706 25855 8103110008 NEGERI LIMA MALUKU 864 Pre-Electrified - - - 127.96603 -3.64658 25856 8103110008 NEGERI LIMA MALUKU 3 874 Pre-Electrified - - - 127.97153 -3.64147 25857 8103110009 SEITH MALUKU 4 875 Pre-Electrified - - - 128.03238 -3.59318 25858 8103110009 SEITH MALUKU 132 Pre-Electrified - - - 128.02770 -3.59197 25859 8103110010 KAITETU MALUKU 950 Pre-Electrified - - - 128.05633 -3.59114 25860 8103110010 KAITETU MALUKU 1 080 Pre-Electrified - - - 128.05952 -3.58994 25861 8103110010 KAITETU MALUKU 510 Pre-Electrified - - - 128.08105 -3.58898 25862 8103110010 KAITETU MALUKU 937 Pre-Electrified - - - 128.08384 -3.58543 25863 8103110010 KAITETU MALUKU 91 Pre-Electrified - - - 128.08405 -3.58274 25864 8103110011 HILA MALUKU 834 Pre-Electrified - - - 128.09812 -3.58828 25865 8103110011 HILA MALUKU 242 Pre-Electrified - - - 128.13046 -3.58740 25866 8103110011 HILA MALUKU 1 088 Pre-Electrified - - - 128.12105 -3.58735 25867 8103110011 HILA MALUKU 959 Pre-Electrified - - - 128.09196 -3.58537 25868 8103110011 HILA MALUKU 223 Pre-Electrified - - - 128.08536 -3.58655 25869 8103110011 HILA MALUKU 2 520 Pre-Electrified - - - 128.08590 -3.58251 25870 8103110012 WAKAL MALUKU 616 Pre-Electrified - - - 128.15708 -3.58897 25871 8103110012 WAKAL MALUKU 10 Pre-Electrified - - - 128.13238 -3.58742 25872 8103110012 WAKAL MALUKU 2 706 Pre-Electrified - - - 128.16411 -3.58892 25873 8103110013 HITU LAMA MALUKU 4 325 Pre-Electrified - - - 128.17479 -3.58913 25874 8103110014 HITU MESING MALUKU 30 Pre-Electrified - - - 128.18978 -3.60709 25875 8103110014 HITU MESING MALUKU 496 Pre-Electrified - - - 128.18754 -3.60375 25876 8103110014 HITU MESING MALUKU 5 909 Pre-Electrified - - - 128.17832 -3.58377 25877 8103110014 HITU MESING MALUKU 160 Pre-Electrified - - - 128.18545 -3.57325 25878 8103110015 MAMALA MALUKU 2 671 Pre-Electrified - - - 128.19268 -3.55631 25879 8103110016 MORELA MALUKU 3 022 Pre-Electrified - - - 128.19532 -3.55201 25880 8103110016 MORELA MALUKU 183 Pre-Electrified - - - 128.20150 -3.54390 25881 8103110016 MORELA MALUKU 435 Pre-Electrified - - - 128.20176 -3.54319 25882 8103111001 LARIKE MALUKU 706 Pre-Electrified - - - 127.92455 -3.70845 25883 8103111001 LARIKE MALUKU 1 OffGrid Systems 1 1 026 0.2 127.94602 -3.50000 25884 8103111002 WAKASIHU MALUKU 961 Pre-Electrified - - - 127.93540 -3.75476 25885 8103111002 WAKASIHU MALUKU 144 Pre-Electrified - - - 127.93429 -3.74947 25886 8103111003 ALLANG MALUKU 3 241 Pre-Electrified - - - 127.99637 -3.77839 25887 8103111003 ALLANG MALUKU 1 143 Pre-Electrified - - - 128.00110 -3.77633 25888 8103111003 ALLANG MALUKU 39 Pre-Electrified - - - 128.02327 -3.75075 25889 8103111003 ALLANG MALUKU 34 Pre-Electrified - - - 128.02267 -3.74911 25890 8103111004 LILIBOI MALUKU 306 Pre-Electrified - - - 128.02343 -3.75043 25891 8103111004 LILIBOI MALUKU 1 539 Pre-Electrified - - - 128.02319 -3.74855 25892 8103111005 HATU MALUKU 2 474 Pre-Electrified - - - 128.05031 -3.72816 25893 8103111005 HATU MALUKU 29 Pre-Electrified - - - 128.06653 -3.72075 25894 8103111005 HATU MALUKU 126 Pre-Electrified - - - 128.06523 -3.72081 Annex II – Demand forecast results Page 187 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 25895 8103140009 HUAULU MALUKU 307 MiniGrid Systems 77 79 002 14.9 129.34783 -2.98268 25896 8103140010 SAWAI MALUKU 34 MiniGrid Systems 16 16 416 3.1 129.20154 -2.96561 25897 8103140010 SAWAI MALUKU 1 202 Pre-Electrified - - - 129.23501 -2.92252 25898 8103140012 KANIKEH MALUKU 114 MiniGrid Systems 39 40 014 7.6 129.39201 -3.01991 25899 8103140012 KANIKEH MALUKU 56 MiniGrid Systems 20 20 520 3.9 129.45365 -3.00801 25900 8103140014 RUMAH SOKAT MALUKU 509 Pre-Electrified - - - 129.37443 -2.81479 25901 8103140015 WAHAI MALUKU 879 Pre-Electrified - - - 129.30963 -2.89889 25902 8103140015 WAHAI MALUKU 1 354 Pre-Electrified - - - 129.30355 -2.89569 25903 8103140015 WAHAI MALUKU 1 381 Pre-Electrified - - - 129.36966 -2.80016 25904 8103140018 KALOA MALUKU 279 MiniGrid Systems 60 61 560 11.6 129.66617 -2.90254 25905 8103140039 MALAKU MALUKU 480 Pre-Electrified - - - 129.41507 -2.79201 25906 8103140039 MALAKU MALUKU 876 Pre-Electrified - - - 129.38964 -2.78836 25907 8103140041 BESI MALUKU 569 Pre-Electrified - - - 129.21346 -2.93892 25908 8103141001 WARASIWA MALUKU 500 Pre-Electrified - - - 128.78344 -2.86530 25909 8103141002 RUMAHWEY MALUKU 277 Pre-Electrified - - - 128.84631 -2.86762 25910 8103141003 LISABATA TIMUR MALUKU 165 Pre-Electrified - - - 128.88228 -2.85832 25911 8103141003 LISABATA TIMUR MALUKU 725 Pre-Electrified - - - 128.88459 -2.85662 25912 8103141004 LATEA MALUKU 667 Pre-Electrified - - - 128.90168 -2.85578 25913 8103142003 MANEO RENDAH MALUKU 8 OffGrid Systems 3 3 078 0.6 129.85284 -2.99809 25914 8103142008 WAIMUSI MALUKU 12 OffGrid Systems 4 4 104 0.8 129.85271 -2.99759 25915 8103143003 SETI MALUKU 3 OffGrid Systems 1 1 026 0.2 129.94893 -3.01141 25916 8103143003 SETI MALUKU 3 OffGrid Systems 1 1 026 0.2 129.86332 -2.94626 25917 8103143003 SETI MALUKU 40 MiniGrid Systems 9 9 234 1.7 129.91312 -2.94648 25918 8103143007 AKETERNATE MALUKU 103 MiniGrid Systems 26 26 676 5.0 130.09305 -3.00901 25919 8104020002 SANLEKO MALUKU 282 Pre-Electrified - - - 127.01527 -3.29953 25920 8104020002 SANLEKO MALUKU 11 Pre-Electrified - - - 127.02370 -3.29191 25921 8104020002 SANLEKO MALUKU 739 Pre-Electrified - - - 127.02123 -3.29307 25922 8104020004 NAMLEA MALUKU 7 OffGrid Systems 2 2 052 0.4 127.09642 -3.22728 25923 8104020005 LALA MALUKU - Pre-Electrified - - - 127.09641 -3.22714 25924 8104020008 JIKUMERASA MALUKU 3 OffGrid Systems 1 1 026 0.2 127.03800 -3.17365 25925 8104021001 UPT K WAPLAN MALUKU 15 OffGrid Systems 4 4 104 0.8 126.92520 -3.49352 25926 8104021002 WAETINA MALUKU 1 OffGrid Systems 1 1 026 0.2 126.91226 -3.46963 25927 8104021004 UPT R WAELEMAN MALUKU 4 OffGrid Systems 2 2 052 0.4 126.95390 -3.42388 25928 8104021004 UPT R WAELEMAN MALUKU 1 OffGrid Systems 1 1 026 0.2 126.95276 -3.42145 25929 8104021005 PARBULU MALUKU 7 OffGrid Systems 2 2 052 0.4 127.01075 -3.42356 25930 8104021009 KAYELI MALUKU 51 MiniGrid Systems 12 12 312 2.3 127.07191 -3.32592 25931 8104021010 DEBOWAE MALUKU 24 MiniGrid Systems 7 7 182 1.4 127.02952 -3.40025 25932 8104021011 GRANDENG MALUKU 1 OffGrid Systems 1 1 026 0.2 126.91194 -3.46955 25933 8104021013 WAEGEREN MALUKU 14 OffGrid Systems 4 4 104 0.8 126.65760 -3.38283 25934 8104021013 WAEGEREN MALUKU 13 OffGrid Systems 4 4 104 0.8 126.66133 -3.36829 25935 8104021013 WAEGEREN MALUKU 9 OffGrid Systems 3 3 078 0.6 126.66272 -3.36781 25936 8104021013 WAEGEREN MALUKU 7 OffGrid Systems 2 2 052 0.4 126.70179 -3.30323 25937 8104021013 WAEGEREN MALUKU 51 MiniGrid Systems 13 13 338 2.5 126.68852 -3.29656 25938 8104021013 WAEGEREN MALUKU 6 OffGrid Systems 2 2 052 0.4 126.72941 -3.29313 25939 8104021013 WAEGEREN MALUKU 5 OffGrid Systems 2 2 052 0.4 126.73593 -3.28625 25940 8104021013 WAEGEREN MALUKU 11 Pre-Electrified - - - 126.83226 -3.42330 25941 8104021013 WAEGEREN MALUKU 4 OffGrid Systems 1 1 026 0.2 126.95265 -3.42107 25942 8104021013 WAEGEREN MALUKU 16 OffGrid Systems 4 4 104 0.8 126.94790 -3.41926 25943 8104021013 WAEGEREN MALUKU 4 OffGrid Systems 1 1 026 0.2 126.92739 -3.41245 25944 8104021013 WAEGEREN MALUKU 14 OffGrid Systems 4 4 104 0.8 126.88982 -3.38696 25945 8104021013 WAEGEREN MALUKU 102 Pre-Electrified - - - 126.86647 -3.37984 25946 8104021013 WAEGEREN MALUKU 115 Pre-Electrified - - - 126.86394 -3.37291 25947 8104021013 WAEGEREN MALUKU 18 MiniGrid Systems 5 5 130 1.0 126.75317 -3.27626 25948 8104021013 WAEGEREN MALUKU 14 OffGrid Systems 4 4 104 0.8 126.76888 -3.26930 25949 8104021014 WAENETAT MALUKU 3 OffGrid Systems 1 1 026 0.2 126.97410 -3.36789 25950 8104021014 WAENETAT MALUKU 22 MiniGrid Systems 7 7 182 1.4 126.95391 -3.36507 25951 8104021018 WAEKERTA MALUKU 1 OffGrid Systems 1 1 026 0.2 126.95380 -3.36403 25952 8104021018 WAEKERTA MALUKU 9 OffGrid Systems 3 3 078 0.6 126.95264 -3.35918 25953 8104021019 SAVANAJAYA MALUKU 161 Pre-Electrified - - - 127.01977 -3.31276 25954 8104021019 SAVANAJAYA MALUKU 870 Pre-Electrified - - - 127.01609 -3.30259 25955 8104021020 WAETELE MALUKU 1 OffGrid Systems 1 1 026 0.2 126.98397 -3.34892 25956 8104021020 WAETELE MALUKU 34 MiniGrid Systems 9 9 234 1.7 126.98946 -3.34608 25957 8104022001 WAEPOTI MALUKU 110 Pre-Electrified - - - 126.68737 -3.11476 25958 8104022002 WAPREA MALUKU 158 Pre-Electrified - - - 126.70404 -3.09505 25959 8104022003 WAILIHANG MALUKU 844 Pre-Electrified - - - 126.73488 -3.10312 25960 8104030001 BARA MALUKU 325 MiniGrid Systems 71 72 846 13.8 126.19643 -3.18608 25961 8104030003 AIR BUAYA MALUKU 81 MiniGrid Systems 19 19 494 3.7 126.39409 -3.09088 25962 8104030005 WAIPURE MALUKU 38 MiniGrid Systems 8 8 208 1.6 126.48543 -3.11971 25963 8104030005 WAIPURE MALUKU 55 MiniGrid Systems 11 11 286 2.1 126.51978 -3.09583 25964 8104030006 WAMLANA MALUKU 91 MiniGrid Systems 19 19 494 3.7 126.57735 -3.41431 25965 8104030006 WAMLANA MALUKU 49 MiniGrid Systems 11 11 286 2.1 126.53913 -3.40826 25966 8104030006 WAMLANA MALUKU 33 MiniGrid Systems 7 7 182 1.4 126.64115 -3.39453 25967 8104030006 WAMLANA MALUKU 122 MiniGrid Systems 26 26 676 5.0 126.59359 -3.31027 25968 8104030006 WAMLANA MALUKU 37 MiniGrid Systems 8 8 208 1.6 126.62923 -3.28361 25969 8104030006 WAMLANA MALUKU 49 MiniGrid Systems 11 11 286 2.1 126.61415 -3.22718 25970 8104030006 WAMLANA MALUKU 51 MiniGrid Systems 11 11 286 2.1 126.59101 -3.22545 25971 8104030006 WAMLANA MALUKU 13 OffGrid Systems 3 3 078 0.6 126.63330 -3.21864 25972 8104030006 WAMLANA MALUKU 12 OffGrid Systems 3 3 078 0.6 126.52389 -3.10634 25973 8104030006 WAMLANA MALUKU 37 MiniGrid Systems 8 8 208 1.6 126.52462 -3.10550 25974 8104030007 WASPAIT MALUKU 75 MiniGrid Systems 10 10 260 1.9 126.57199 -3.20678 25975 8104030007 WASPAIT MALUKU 50 MiniGrid Systems 7 7 182 1.4 126.57806 -3.08384 25976 8105010006 POPJETUR MALUKU 394 MiniGrid Systems 85 87 210 16.5 134.19635 -6.72642 25977 8105010008 NGAIBOR MALUKU 222 MiniGrid Systems 55 56 430 10.7 134.07715 -6.71811 25978 8105010008 NGAIBOR MALUKU 96 MiniGrid Systems 24 24 624 4.7 134.08202 -6.70965 25979 8105010008 NGAIBOR MALUKU 141 MiniGrid Systems 35 35 910 6.8 134.08492 -6.70495 Annex II – Demand forecast results Page 188 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 25980 8105010009 FATURAL MALUKU 161 MiniGrid Systems 30 30 780 5.8 134.11601 -6.68747 25981 8105010011 JELIA MALUKU 226 MiniGrid Systems 69 70 794 13.4 134.29480 -6.66606 25982 8105010016 DOKA TIMUR MALUKU 254 MiniGrid Systems 61 62 586 11.8 134.33437 -6.62874 25983 8105010019 NGAIGULI MALUKU 51 MiniGrid Systems 16 16 416 3.1 134.14859 -6.65468 25984 8105010019 NGAIGULI MALUKU 26 MiniGrid Systems 8 8 208 1.6 134.08918 -6.64917 25985 8105010019 NGAIGULI MALUKU 40 MiniGrid Systems 13 13 338 2.5 134.09232 -6.63597 25986 8105010019 NGAIGULI MALUKU 39 MiniGrid Systems 12 12 312 2.3 134.09554 -6.62340 25987 8105010020 FERUNI MALUKU 308 Pre-Electrified - - - 134.11801 -6.59950 25988 8105010022 KABALUKIN MALUKU 218 Pre-Electrified - - - 134.09862 -6.53149 25989 8105010022 KABALUKIN MALUKU 81 MiniGrid Systems 17 17 442 3.3 134.09907 -6.50845 25990 8105010022 KABALUKIN MALUKU 78 MiniGrid Systems 16 16 416 3.1 134.12983 -6.48772 25991 8105010022 KABALUKIN MALUKU 140 MiniGrid Systems 29 29 754 5.6 134.12611 -6.45816 25992 8105010026 LUTUR MALUKU 93 MiniGrid Systems 26 26 676 5.0 134.13587 -6.31777 25993 8105010026 LUTUR MALUKU 343 MiniGrid Systems 95 97 470 18.4 134.25177 -6.26838 25994 8105010027 HOKMAR MALUKU 272 MiniGrid Systems 65 66 690 12.6 134.12576 -6.23952 25995 8105011001 BATUGOYANG MALUKU 57 MiniGrid Systems 16 16 416 3.1 134.19895 -6.93904 25996 8105011006 DOSIMAR MALUKU 152 MiniGrid Systems 35 35 910 6.8 134.14768 -6.85778 25997 8105011008 JORANG MALUKU 421 MiniGrid Systems 84 86 184 16.3 134.40722 -6.67321 25998 8105011009 GOMARMETI MALUKU 557 MiniGrid Systems 116 119 016 22.5 134.47896 -6.66015 25999 8105011010 JURING MALUKU 540 MiniGrid Systems 95 97 470 18.4 134.29668 -6.37928 26000 8105011011 ERERSIN MALUKU 282 MiniGrid Systems 47 48 222 9.1 134.38766 -6.46768 26001 8105011012 GOMARSUNGAI MALUKU 346 MiniGrid Systems 77 79 002 14.9 134.48899 -6.56214 26002 8105020007 KOBADANGAR MALUKU 173 MiniGrid Systems 43 44 118 8.3 134.63135 -6.47934 26003 8105020007 KOBADANGAR MALUKU 206 MiniGrid Systems 52 53 352 10.1 134.64230 -6.47718 26004 8105020008 KOBASELTIMUR MALUKU 235 MiniGrid Systems 43 44 118 8.3 134.60910 -6.48416 26005 8105020009 KOBASELFARA MALUKU 219 MiniGrid Systems 48 49 248 9.3 134.58159 -6.48307 26006 8105020010 FATLABATA MALUKU 306 MiniGrid Systems 69 70 794 13.4 134.50893 -6.47068 26007 8105020011 MURAI MALUKU 310 MiniGrid Systems 85 87 210 16.5 134.47179 -6.26220 26008 8105020012 MANJAU MALUKU 213 MiniGrid Systems 40 41 040 7.8 134.48781 -6.31977 26009 8105020013 LORANG MALUKU 214 MiniGrid Systems 54 55 404 10.5 134.44477 -6.36328 26010 8105020015 MAEKOR MALUKU 118 MiniGrid Systems 26 26 676 5.0 134.12744 -6.12452 26011 8105020020 IRLOY MALUKU 40 MiniGrid Systems 11 11 286 2.1 134.46659 -6.24237 26012 8105020020 IRLOY MALUKU 33 MiniGrid Systems 10 10 260 1.9 134.43190 -6.22138 26013 8105020020 IRLOY MALUKU 67 MiniGrid Systems 19 19 494 3.7 134.48057 -6.19954 26014 8105020020 IRLOY MALUKU 37 MiniGrid Systems 11 11 286 2.1 134.48179 -6.19279 26015 8105020020 IRLOY MALUKU 101 MiniGrid Systems 28 28 728 5.4 134.48328 -6.17994 26016 8105020021 KWARBOLA MALUKU 181 MiniGrid Systems 37 37 962 7.2 134.57419 -6.33057 26017 8105020032 ALGADANG MALUKU 388 MiniGrid Systems 70 71 820 13.6 134.54940 -6.17650 26018 8105021001 PONOM MALUKU 185 MiniGrid Systems 35 35 910 6.8 134.62322 -6.34554 26019 8105021002 WAILAY MALUKU 230 MiniGrid Systems 40 41 040 7.8 134.61313 -6.30121 26020 8105021003 KAIWABAR MALUKU 161 MiniGrid Systems 32 32 832 6.2 134.66425 -6.31189 26021 8105021004 BASADA MALUKU 188 MiniGrid Systems 32 32 832 6.2 134.67811 -6.27839 26022 8105021005 KOBROR MALUKU 283 MiniGrid Systems 57 58 482 11.1 134.68121 -6.24248 26023 8105021006 WARJUKUR MALUKU 430 MiniGrid Systems 70 71 820 13.6 134.71087 -6.21724 26024 8105021007 LOLA MALUKU 151 MiniGrid Systems 31 31 806 6.0 134.86259 -6.20951 26025 8105021008 MARIRI MALUKU 275 MiniGrid Systems 61 62 586 11.8 134.87543 -6.16449 26026 8105021009 WARLOY MALUKU 146 MiniGrid Systems 30 30 780 5.8 134.67916 -6.17075 26027 8105021010 KOIJABI MALUKU 1 038 MiniGrid Systems 179 183 654 34.7 134.72602 -6.13790 26028 8105021011 BALATAN MALUKU 236 MiniGrid Systems 53 54 378 10.3 134.66583 -6.07733 26029 8105021013 KARAWAI MALUKU 276 MiniGrid Systems 58 59 508 11.3 134.69806 -5.90106 26030 8105022001 APARA MALUKU 1 005 MiniGrid Systems 172 176 472 33.4 134.65965 -6.69952 26031 8105022002 LONGGAR MALUKU 1 315 MiniGrid Systems 214 219 564 41.5 134.61378 -6.88134 26032 8105022003 BEMUN MALUKU 266 MiniGrid Systems 54 55 404 10.5 134.67408 -6.77618 26033 8105022003 BEMUN MALUKU 269 MiniGrid Systems 54 55 404 10.5 134.66230 -6.77443 26034 8105022004 MESIANG MALUKU 1 079 MiniGrid Systems 263 269 838 51.0 134.75514 -6.63051 26035 8105022005 GOMO GOMO MALUKU 383 MiniGrid Systems 75 76 950 14.6 134.77507 -6.62225 26036 8105022006 JAMBU AIR MALUKU 297 MiniGrid Systems 91 93 366 17.7 134.82057 -6.48652 26037 8105022006 JAMBU AIR MALUKU 129 MiniGrid Systems 40 41 040 7.8 134.83181 -6.48290 26038 8105022007 WARABAL MALUKU 112 MiniGrid Systems 28 28 728 5.4 134.84392 -6.47228 26039 8105022007 WARABAL MALUKU 59 MiniGrid Systems 15 15 390 2.9 134.82469 -6.46425 26040 8105022007 WARABAL MALUKU 119 MiniGrid Systems 30 30 780 5.8 134.88620 -6.36960 26041 8105022007 WARABAL MALUKU 50 MiniGrid Systems 13 13 338 2.5 134.90130 -6.30538 26042 8105030074 KOBRAUR MALUKU 153 MiniGrid Systems 34 34 884 6.6 134.35492 -5.94785 26043 8105030075 LAU LAU MALUKU 95 MiniGrid Systems 26 26 676 5.0 134.29688 -5.92112 26044 8105030089 TUNGUWATU MALUKU 484 MiniGrid Systems 104 106 704 20.2 134.42055 -5.78262 26045 8105030090 JABULENGA MALUKU 322 MiniGrid Systems 65 66 690 12.6 134.37427 -5.75085 26046 8105030091 TUNGU MALUKU 224 MiniGrid Systems 38 38 988 7.4 134.39149 -5.82173 26047 8105030092 GORAR MALUKU 267 MiniGrid Systems 56 57 456 10.9 134.39491 -5.86165 26048 8105030093 KARANGGULI MALUKU 282 MiniGrid Systems 45 46 170 8.7 134.29772 -5.74092 26049 8105030095 WANGEL MALUKU 1 685 Pre-Electrified - - - 134.20784 -5.75798 26050 8105030096 GALAY DUBU MALUKU 8 430 Pre-Electrified - - - 134.23571 -5.75967 26051 8105030097 SIWALIMA MALUKU 19 058 Pre-Electrified - - - 134.22112 -5.76154 26052 8105030101 GODA GODA MALUKU 132 MiniGrid Systems 29 29 754 5.6 134.35567 -5.68958 26053 8105030101 GODA GODA MALUKU 118 MiniGrid Systems 26 26 676 5.0 134.38439 -5.66507 26054 8105030101 GODA GODA MALUKU 119 MiniGrid Systems 26 26 676 5.0 134.42780 -5.61239 26055 8105030101 GODA GODA MALUKU 95 MiniGrid Systems 21 21 546 4.1 134.44674 -5.56563 26056 8105031006 KOMPANE MALUKU 365 MiniGrid Systems 78 80 028 15.1 134.71134 -5.67379 26057 8105031007 BERDEFAN MALUKU 175 MiniGrid Systems 37 37 962 7.2 134.65172 -5.64751 26058 8105031008 LANGHALAU MALUKU 214 MiniGrid Systems 45 46 170 8.7 134.58244 -5.61818 26059 8106010010 WAESALA MALUKU 200 Pre-Electrified - - - 127.92932 -3.13957 26060 8106010010 WAESALA MALUKU 496 Pre-Electrified - - - 127.99126 -3.10519 26061 8106010010 WAESALA MALUKU 48 Pre-Electrified - - - 127.96105 -3.10460 26062 8106010010 WAESALA MALUKU 1 488 Pre-Electrified - - - 128.02452 -3.08118 26063 8106010012 BUANO UTARA MALUKU 743 Pre-Electrified - - - 127.87880 -2.96537 26064 8106010012 BUANO UTARA MALUKU 242 Pre-Electrified - - - 127.90140 -2.95622 Annex II – Demand forecast results Page 189 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 26065 8106010014 ALANG ASAUDE MALUKU 989 Pre-Electrified - - - 127.95213 -3.12041 26066 8106010014 ALANG ASAUDE MALUKU 54 Pre-Electrified - - - 127.94761 -3.11313 26067 8106011001 TUNIWARA MALUKU 105 MiniGrid Systems 27 27 702 5.2 127.51425 -3.28811 26068 8106020015 KAIBOBU MALUKU 44 MiniGrid Systems 9 9 234 1.7 128.17138 -3.16546 26069 8106020016 ETTY MALUKU 437 Pre-Electrified - - - 128.14165 -3.08116 26070 8106020016 ETTY MALUKU 794 Pre-Electrified - - - 128.12185 -3.06473 26071 8106020016 ETTY MALUKU 2 179 Pre-Electrified - - - 128.11830 -3.01037 26072 8106020020 PIRU MALUKU 247 Pre-Electrified - - - 128.09245 -3.12861 26073 8106020020 PIRU MALUKU 1 338 Pre-Electrified - - - 128.12835 -3.09443 26074 8106020020 PIRU MALUKU 229 Pre-Electrified - - - 128.13450 -3.08461 26075 8106020020 PIRU MALUKU 2 430 Pre-Electrified - - - 128.06331 -3.07964 26076 8106020020 PIRU MALUKU 527 Pre-Electrified - - - 128.07452 -3.07532 26077 8106020020 PIRU MALUKU 952 Pre-Electrified - - - 128.08958 -3.07028 26078 8106020020 PIRU MALUKU 395 Pre-Electrified - - - 128.11504 -3.06617 26079 8106020020 PIRU MALUKU 113 Pre-Electrified - - - 128.11955 -3.06619 26080 8106020020 PIRU MALUKU 309 Pre-Electrified - - - 128.12279 -3.01497 26081 8106020021 NEGERI KAWA MALUKU 203 Pre-Electrified - - - 128.13537 -2.98847 26082 8106020021 NEGERI KAWA MALUKU 65 MiniGrid Systems 14 14 364 2.7 128.08703 -2.98552 26083 8106020021 NEGERI KAWA MALUKU 719 Pre-Electrified - - - 128.11863 -2.96947 26084 8106020021 NEGERI KAWA MALUKU 837 Pre-Electrified - - - 128.14330 -2.92229 26085 8106020021 NEGERI KAWA MALUKU 211 MiniGrid Systems 43 44 118 8.3 128.16569 -2.88288 26086 8106021001 KULUR MALUKU 1 023 Pre-Electrified - - - 127.97948 -3.39237 26087 8106021002 IHA MALUKU 1 941 Pre-Electrified - - - 127.98059 -3.38994 26088 8106021002 IHA MALUKU 780 Pre-Electrified - - - 128.03757 -3.35445 26089 8106021002 IHA MALUKU 664 Pre-Electrified - - - 128.05380 -3.32616 26090 8106021003 LUHU MALUKU 1 309 Pre-Electrified - - - 127.93388 -3.39379 26091 8106021003 LUHU MALUKU 809 Pre-Electrified - - - 127.93907 -3.38798 26092 8106021003 LUHU MALUKU 1 012 Pre-Electrified - - - 127.94238 -3.38277 26093 8106021003 LUHU MALUKU 10 759 Pre-Electrified - - - 127.98311 -3.38383 26094 8106021003 LUHU MALUKU 918 Pre-Electrified - - - 127.94173 -3.37472 26095 8106021003 LUHU MALUKU 3 834 Pre-Electrified - - - 127.94339 -3.36162 26096 8106021003 LUHU MALUKU 1 440 Pre-Electrified - - - 127.93826 -3.34187 26097 8106021004 LOKKI MALUKU 1 706 Pre-Electrified - - - 128.05888 -3.30809 26098 8106021004 LOKKI MALUKU 2 430 Pre-Electrified - - - 128.05960 -3.29349 26099 8106021004 LOKKI MALUKU 812 Pre-Electrified - - - 128.05831 -3.27868 26100 8106021004 LOKKI MALUKU 1 351 Pre-Electrified - - - 128.05875 -3.26246 26101 8106021004 LOKKI MALUKU 737 Pre-Electrified - - - 128.06421 -3.24744 26102 8106021004 LOKKI MALUKU 336 Pre-Electrified - - - 128.06565 -3.23816 26103 8106021004 LOKKI MALUKU 902 Pre-Electrified - - - 128.06705 -3.22602 26104 8106021004 LOKKI MALUKU 1 510 Pre-Electrified - - - 128.06606 -3.21752 26105 8106021004 LOKKI MALUKU 867 Pre-Electrified - - - 128.06771 -3.20502 26106 8106021005 ARIATE MALUKU 1 054 Pre-Electrified - - - 128.07275 -3.18397 26107 8106030001 KAIRATU MALUKU 586 Pre-Electrified - - - 128.39686 -3.39566 26108 8106030001 KAIRATU MALUKU 1 025 Pre-Electrified - - - 128.38783 -3.38655 26109 8106030001 KAIRATU MALUKU 2 296 Pre-Electrified - - - 128.37008 -3.35996 26110 8106030001 KAIRATU MALUKU 5 011 Pre-Electrified - - - 128.36756 -3.34687 26111 8106030002 SERUAWAN MALUKU 648 Pre-Electrified - - - 128.43045 -3.44126 26112 8106030003 KAMARIAN MALUKU 1 608 Pre-Electrified - - - 128.41948 -3.43339 26113 8106030003 KAMARIAN MALUKU 3 291 Pre-Electrified - - - 128.40972 -3.43096 26114 8106030020 WAIMITAL MALUKU 5 143 Pre-Electrified - - - 128.35059 -3.33261 26115 8106030020 WAIMITAL MALUKU 93 MiniGrid Systems 20 20 520 3.9 128.41097 -3.27555 26116 8106030021 HATUSUA MALUKU 1 131 Pre-Electrified - - - 128.32978 -3.30799 26117 8106030028 URAUR MALUKU 13 OffGrid Systems 3 3 078 0.6 128.38067 -3.33495 26118 8106030029 WAIPIRIT MALUKU 682 Pre-Electrified - - - 128.34351 -3.33320 26119 8106031001 WAISARISA MALUKU 41 Pre-Electrified - - - 128.27613 -3.21284 26120 8106031001 WAISARISA MALUKU 928 Pre-Electrified - - - 128.27189 -3.20486 26121 8106031002 KAMAL MALUKU 4 621 Pre-Electrified - - - 128.28600 -3.21916 26122 8106031002 KAMAL MALUKU 1 209 Pre-Electrified - - - 128.28025 -3.21384 26123 8106031003 NURUE MALUKU 1 604 Pre-Electrified - - - 128.30113 -3.24179 26124 8106031004 WAESAMU MALUKU 951 Pre-Electrified - - - 128.31419 -3.27655 26125 8106031004 WAESAMU MALUKU 64 Pre-Electrified - - - 128.31355 -3.26962 26126 8106031004 WAESAMU MALUKU 644 Pre-Electrified - - - 128.30519 -3.25708 26127 8106031005 WAIHATU MALUKU 1 477 Pre-Electrified - - - 128.32296 -3.28883 26128 8106032001 RUMBERU MALUKU 53 MiniGrid Systems 13 13 338 2.5 128.43085 -3.21517 26129 8106033001 TIHULALE MALUKU 1 705 Pre-Electrified - - - 128.51884 -3.45596 26130 8106033002 RUMAHKAY MALUKU 2 066 Pre-Electrified - - - 128.53797 -3.44795 26131 8106033003 LATU MALUKU 981 Pre-Electrified - - - 128.62125 -3.42858 26132 8106033003 LATU MALUKU 337 Pre-Electrified - - - 128.61251 -3.42450 26133 8106033003 LATU MALUKU 2 351 Pre-Electrified - - - 128.68832 -3.41906 26134 8106033004 TOMALEHU MALUKU 252 Pre-Electrified - - - 128.69250 -3.41457 26135 8106033004 TOMALEHU MALUKU 506 Pre-Electrified - - - 128.69420 -3.40881 26136 8106033005 HUALOY MALUKU 1 899 Pre-Electrified - - - 128.69191 -3.40648 26137 8106033006 SERIHOLO MALUKU 394 Pre-Electrified - - - 128.68025 -3.35689 26138 8106033006 SERIHOLO MALUKU 239 Pre-Electrified - - - 128.68940 -3.34960 26139 8106033007 TALA MALUKU 260 Pre-Electrified - - - 128.69193 -3.34644 26140 8106033007 TALA MALUKU 83 MiniGrid Systems 22 22 572 4.3 128.66298 -3.30078 26141 8106034001 SUMEITH PASINARO MALUKU 242 MiniGrid Systems 50 51 300 9.7 128.62431 -3.28500 26142 8106040001 RUMAHSOAL MALUKU 218 MiniGrid Systems 39 40 014 7.6 128.41485 -3.04350 26143 8106040002 LOHIA SAPALEWA MALUKU 323 MiniGrid Systems 60 61 560 11.6 128.47183 -3.07589 26144 8106040003 LATURAKE MALUKU 346 MiniGrid Systems 74 75 924 14.4 128.59964 -2.97159 26145 8106040005 RIRING MALUKU 126 MiniGrid Systems 27 27 702 5.2 128.42857 -2.99896 26146 8106040006 NINIARI MALUKU 392 MiniGrid Systems 67 68 742 13.0 128.33294 -2.96036 26147 8106040007 MORNATEN MALUKU 1 393 Pre-Electrified - - - 128.34507 -2.86355 26148 8106040008 NIKULUKAN MALUKU 580 Pre-Electrified - - - 128.37695 -2.87200 26149 8106040009 NIWELEHU MALUKU 608 Pre-Electrified - - - 128.38121 -2.87246 Annex II – Demand forecast results Page 190 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 26150 8106040010 NUNIALI MALUKU 455 Pre-Electrified - - - 128.39602 -2.87087 26151 8106040011 LISABATA MALUKU 1 035 Pre-Electrified - - - 128.40052 -2.87124 26152 8106040012 WAKOLO MALUKU 326 Pre-Electrified - - - 128.40507 -2.86920 26153 8106040013 PATAHUWE MALUKU 465 Pre-Electrified - - - 128.41893 -2.86404 26154 8106040014 TANIWEL MALUKU 283 Pre-Electrified - - - 128.48206 -2.95706 26155 8106040014 TANIWEL MALUKU 645 Pre-Electrified - - - 128.47110 -2.85300 26156 8106040014 TANIWEL MALUKU 694 Pre-Electrified - - - 128.48021 -2.85139 26157 8106040015 UWETH MALUKU 620 Pre-Electrified - - - 128.49506 -2.85663 26158 8106040016 HULUNG MALUKU 466 Pre-Electrified - - - 128.56181 -2.85460 26159 8106040016 HULUNG MALUKU 272 Pre-Electrified - - - 128.54223 -2.85031 26160 8106040017 KASIE MALUKU 1 241 Pre-Electrified - - - 128.54639 -2.85168 26161 8106040018 NUKUHAY MALUKU 324 Pre-Electrified - - - 128.59207 -2.85234 26162 8106040018 NUKUHAY MALUKU 3 Pre-Electrified - - - 128.59638 -2.85184 26163 8106040019 PASINALO MALUKU 356 Pre-Electrified - - - 128.59806 -2.85134 26164 8106041001 SOUHUWE MALUKU 576 Pre-Electrified - - - 128.63635 -2.85560 26165 8106041002 MALOANG MALUKU 100 Pre-Electrified - - - 128.65036 -2.84783 26166 8106041003 LUMAHLATAL MALUKU 395 Pre-Electrified - - - 128.65509 -2.84346 26167 8106041004 HATUNURU MALUKU 368 Pre-Electrified - - - 128.70321 -2.86280 26168 8106041005 MATAPA MALUKU 284 Pre-Electrified - - - 128.70782 -2.86388 26169 8106041006 SOAKASALE MALUKU 373 Pre-Electrified - - - 128.71146 -2.86328 26170 8106041007 MAKUBUBUY MALUKU 485 Pre-Electrified - - - 128.71233 -2.86486 26171 8106041008 SUKARAJA MALUKU 521 Pre-Electrified - - - 128.71407 -2.86237 26172 8106041009 LUMAHPELU MALUKU 491 Pre-Electrified - - - 128.71735 -2.86194 26173 8106041010 UWEN PANTAI MALUKU 277 Pre-Electrified - - - 128.72018 -2.86212 26174 8106041011 TAUNUSSA MALUKU 326 Pre-Electrified - - - 128.72379 -2.86304 26175 8106041012 MUSIHUWEY MALUKU 422 Pre-Electrified - - - 128.72367 -2.86177 26176 8106041013 SOLEA MALUKU 445 Pre-Electrified - - - 128.72558 -2.86274 26177 8106041014 WARALOIN MALUKU 306 Pre-Electrified - - - 128.72893 -2.86033 26178 8106041015 WALAKONE MALUKU 572 Pre-Electrified - - - 128.74291 -2.85567 26179 8107010010 AMARSEKARU MALUKU 7 050 Pre-Electrified - - - 131.32998 -4.11555 26180 8107010024 LOKO MALUKU 194 Pre-Electrified - - - 131.35782 -4.12170 26181 8107011002 TAMHER WARAT MALUKU 2 267 Pre-Electrified - - - 131.66772 -4.51361 26182 8107011003 KELANGAN MALUKU 347 Pre-Electrified - - - 131.66070 -4.52538 26183 8107011004 TAMHER TIMUR MALUKU 1 016 Pre-Electrified - - - 131.67766 -4.52231 26184 8107011005 AMAR LAUT MALUKU 1 011 Pre-Electrified - - - 131.64172 -4.47024 26185 8107020026 URUNG MALUKU 331 Pre-Electrified - - - 130.82027 -3.83282 26186 8107020028 KWAOS MALUKU 568 Pre-Electrified - - - 130.82531 -3.79661 26187 8107020029 KIANLAUT MALUKU 147 Pre-Electrified - - - 130.82852 -3.74673 26188 8107020029 KIANLAUT MALUKU 286 Pre-Electrified - - - 130.82833 -3.74224 26189 8107020042 SALAGOR KOTA MALUKU 462 Pre-Electrified - - - 130.82743 -3.72307 26190 8107020043 SALAGOR AIR MALUKU 472 Pre-Electrified - - - 130.82331 -3.70662 26191 8107020044 ARUAN GAUR MALUKU 268 Pre-Electrified - - - 130.82164 -3.70343 26192 8107020044 ARUAN GAUR MALUKU 177 Pre-Electrified - - - 130.82296 -3.69697 26193 8107020055 SURU MALUKU 1 012 Pre-Electrified - - - 130.83170 -3.77136 26194 8107020056 LIANTASIK MALUKU 185 Pre-Electrified - - - 130.82914 -3.76641 26195 8107020056 LIANTASIK MALUKU 259 Pre-Electrified - - - 130.83005 -3.75799 26196 8107020057 KETA MALUKU 255 Pre-Electrified - - - 130.82984 -3.75605 26197 8107021001 DANAMA MALUKU 18 Pre-Electrified - - - 130.84999 -3.63926 26198 8107021001 DANAMA MALUKU 139 Pre-Electrified - - - 130.85571 -3.63717 26199 8107021001 DANAMA MALUKU 582 Pre-Electrified - - - 130.87109 -3.62773 26200 8107021001 DANAMA MALUKU 278 Pre-Electrified - - - 130.87931 -3.60990 26201 8107021002 KILMOY MALUKU 399 Pre-Electrified - - - 130.88040 -3.59686 26202 8107021005 AIRKASAR MALUKU 186 Pre-Electrified - - - 130.86205 -3.55572 26203 8107021006 WARAS-WARAS MALUKU 457 Pre-Electrified - - - 130.85241 -3.54961 26204 8107021006 WARAS-WARAS MALUKU 196 Pre-Electrified - - - 130.83989 -3.54441 26205 8107021006 WARAS-WARAS MALUKU 7 Pre-Electrified - - - 130.83028 -3.54279 26206 8107021006 WARAS-WARAS MALUKU 52 Pre-Electrified - - - 130.83783 -3.54206 26207 8107021007 GAH MALUKU 1 042 Pre-Electrified - - - 130.83005 -3.54279 26208 8107021008 WALANG TENGA MALUKU 319 Pre-Electrified - - - 130.84242 -3.64549 26209 8107022002 KILMURY MALUKU 11 MiniGrid Systems 6 6 156 1.2 130.47959 -3.70135 26210 8107022002 KILMURY MALUKU 41 MiniGrid Systems 20 20 520 3.9 130.47463 -3.69106 26211 8107022002 KILMURY MALUKU 32 MiniGrid Systems 16 16 416 3.1 130.54287 -3.71148 26212 8107022002 KILMURY MALUKU 17 MiniGrid Systems 9 9 234 1.7 130.52075 -3.70791 26213 8107022002 KILMURY MALUKU 36 MiniGrid Systems 18 18 468 3.5 130.52902 -3.70756 26214 8107022002 KILMURY MALUKU 20 MiniGrid Systems 10 10 260 1.9 130.51321 -3.70697 26215 8107030007 BEMO MALUKU 391 Pre-Electrified - - - 129.97858 -3.43248 26216 8107030007 BEMO MALUKU 266 Pre-Electrified - - - 129.97306 -3.41994 26217 8107030008 WERINAMA MALUKU 1 545 Pre-Electrified - - - 129.99769 -3.45558 26218 8107030008 WERINAMA MALUKU 148 Pre-Electrified - - - 130.00016 -3.45865 26219 8107030009 HATUMETEN MALUKU 380 MiniGrid Systems 75 76 950 14.6 130.25900 -3.42721 26220 8107030010 BATUASA MALUKU 157 Pre-Electrified - - - 130.20349 -3.55342 26221 8107030010 BATUASA MALUKU 467 Pre-Electrified - - - 130.18225 -3.54758 26222 8107030021 BEMO PERAK MALUKU 100 Pre-Electrified - - - 129.97686 -3.41030 26223 8107031001 DIHIL MALUKU 298 Pre-Electrified - - - 129.86794 -3.33585 26224 8107031002 LILIAMA MALUKU 230 Pre-Electrified - - - 129.88207 -3.33923 26225 8107031002 LILIAMA MALUKU 37 Pre-Electrified - - - 129.86856 -3.33600 26226 8107031003 POLIN MALUKU 590 Pre-Electrified - - - 129.89546 -3.33621 26227 8107031004 TUNSAI MALUKU 529 Pre-Electrified - - - 129.91553 -3.33532 26228 8107031005 LAPELA MALUKU 88 Pre-Electrified - - - 129.93122 -3.33917 26229 8107031005 LAPELA MALUKU 195 Pre-Electrified - - - 129.92197 -3.33533 26230 8107031006 NAYET MALUKU 175 Pre-Electrified - - - 129.93076 -3.33855 26231 8107031007 ELNUSA MALUKU 536 Pre-Electrified - - - 129.94013 -3.34470 26232 8107031008 ATIAHU MALUKU 217 Pre-Electrified - - - 129.97133 -3.37594 26233 8107031008 ATIAHU MALUKU 1 023 Pre-Electrified - - - 129.96330 -3.36473 26234 8107031009 ADABAI MALUKU 181 Pre-Electrified - - - 129.97543 -3.38227 Annex II – Demand forecast results Page 191 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 26235 8107031010 NAIWEL AHINULIN MALUKU 305 Pre-Electrified - - - 129.95952 -3.35582 26236 8107031011 ABULETA MALUKU 213 Pre-Electrified - - - 129.95610 -3.35281 26237 8107031012 SABUAI MALUKU 226 Pre-Electrified - - - 129.95190 -3.34991 26238 8107040001 WARU MALUKU 608 Pre-Electrified - - - 130.67705 -3.40594 26239 8107040002 BELIS MALUKU 125 Pre-Electrified - - - 130.67087 -3.40466 26240 8107040002 BELIS MALUKU 385 Pre-Electrified - - - 130.65825 -3.39051 26241 8107040003 SOLANG MALUKU 385 MiniGrid Systems 80 82 080 15.5 130.55678 -3.40328 26242 8107040004 DAWANG MALUKU 4 Pre-Electrified - - - 130.63486 -3.34502 26243 8107040004 DAWANG MALUKU 565 Pre-Electrified - - - 130.62939 -3.31883 26244 8107040005 SALAS MALUKU 72 Pre-Electrified - - - 130.61277 -3.20405 26245 8107040005 SALAS MALUKU 108 Pre-Electrified - - - 130.60616 -3.18558 26246 8107040006 BULA MALUKU 7 956 Pre-Electrified - - - 130.49227 -3.10427 26247 8107040006 BULA MALUKU 45 Pre-Electrified - - - 130.50555 -3.11093 26248 8107040006 BULA MALUKU 415 Pre-Electrified - - - 130.51939 -3.10695 26249 8107040006 BULA MALUKU 958 Pre-Electrified - - - 130.50454 -3.10782 26250 8107040006 BULA MALUKU 1 236 Pre-Electrified - - - 130.51304 -3.10827 26251 8107040006 BULA MALUKU 437 Pre-Electrified - - - 130.50054 -3.10630 26252 8107040007 HOTE MALUKU 96 Pre-Electrified - - - 130.36942 -2.99092 26253 8107040007 HOTE MALUKU 60 MiniGrid Systems 16 16 416 3.1 130.30855 -2.97358 26254 8107040008 BENGGOI MALUKU 55 MiniGrid Systems 14 14 364 2.7 130.17859 -3.00940 26255 8107040008 BENGGOI MALUKU 81 MiniGrid Systems 20 20 520 3.9 130.30585 -2.97462 26256 8107040016 KARAY MALUKU 11 OffGrid Systems 3 3 078 0.6 130.74741 -3.40286 26257 8107040016 KARAY MALUKU 184 MiniGrid Systems 40 41 040 7.8 130.80275 -3.32043 26258 8107040016 KARAY MALUKU 97 MiniGrid Systems 22 22 572 4.3 130.77609 -3.29973 26259 8107040018 SESAR MALUKU 485 Pre-Electrified - - - 130.45468 -3.06495 26260 8107040018 SESAR MALUKU 446 Pre-Electrified - - - 130.44709 -3.06226 26261 8107040019 ENGLAS MALUKU 600 Pre-Electrified - - - 130.44309 -3.05607 26262 8108010001 USTUTUN MALUKU 972 MiniGrid Systems 186 190 836 36.1 125.73773 -7.99880 26263 8108010002 KARBUBU MALUKU 336 MiniGrid Systems 62 63 612 12.0 125.86590 -7.93107 26264 8108010003 KLISHATU MALUKU 279 MiniGrid Systems 86 88 236 16.7 125.82567 -7.92516 26265 8108010004 ILMAMAU MALUKU 332 MiniGrid Systems 62 63 612 12.0 125.88767 -7.80726 26266 8108010005 TELEMAR MALUKU 174 MiniGrid Systems 46 47 196 8.9 125.95204 -7.91442 26267 8108010006 ARNAU MALUKU 296 MiniGrid Systems 89 91 314 17.3 126.13964 -7.89241 26268 8108010007 ERAY MALUKU 244 MiniGrid Systems 58 59 508 11.3 125.91637 -7.74420 26269 8108010008 NABAR MALUKU 215 MiniGrid Systems 45 46 170 8.7 125.93441 -7.69307 26270 8108010009 ESULIT MALUKU 382 MiniGrid Systems 87 89 262 16.9 125.99808 -7.68055 26271 8108010010 NAUMATANG MALUKU 177 MiniGrid Systems 36 36 936 7.0 126.09175 -7.72835 26272 8108010011 LURANG MALUKU 399 MiniGrid Systems 109 111 834 21.1 126.19185 -7.72841 26273 8108010011 LURANG MALUKU 88 MiniGrid Systems 24 24 624 4.7 126.27718 -7.69197 26274 8108010012 HIAY MALUKU 244 MiniGrid Systems 53 54 378 10.3 126.23612 -7.86656 26275 8108010013 ILWAKI MALUKU 644 MiniGrid Systems 165 169 290 32.0 126.33415 -7.91428 26276 8108010014 ILPUTIH MALUKU 389 MiniGrid Systems 76 77 976 14.7 126.42868 -7.93328 26277 8108010015 MAHUAN MALUKU 218 MiniGrid Systems 43 44 118 8.3 126.44584 -7.82208 26278 8108010016 MASAPUN MALUKU 366 MiniGrid Systems 98 100 548 19.0 126.54585 -7.82852 26279 8108010017 UHAK MALUKU 263 MiniGrid Systems 80 82 080 15.5 126.29831 -7.69374 26280 8108010018 MONING MALUKU 243 MiniGrid Systems 56 57 456 10.9 126.61497 -7.63754 26281 8108010019 TOMLIAPAT MALUKU 351 MiniGrid Systems 54 55 404 10.5 126.56794 -7.74393 26282 8108010020 ILPOKIL MALUKU 243 MiniGrid Systems 55 56 430 10.7 126.62689 -7.77848 26283 8108010020 ILPOKIL MALUKU 26 MiniGrid Systems 6 6 156 1.2 126.65067 -7.77488 26284 8108010021 KOHOILIN MALUKU 459 MiniGrid Systems 110 112 860 21.3 126.79377 -7.74169 26285 8108010022 ILWAY MALUKU 49 MiniGrid Systems 12 12 312 2.3 126.81232 -7.68392 26286 8108010022 ILWAY MALUKU 144 MiniGrid Systems 35 35 910 6.8 126.80835 -7.67578 26287 8108010023 ARWALA MALUKU 244 MiniGrid Systems 60 61 560 11.6 126.68946 -7.63498 26288 8108020001 LEKLOOR MALUKU 1 271 Pre-Electrified - - - 127.18688 -8.00415 26289 8108020002 OIRATA BARAT MALUKU 555 Pre-Electrified - - - 127.21217 -8.02016 26290 8108020003 OIRATA TIMUR MALUKU 1 011 Pre-Electrified - - - 127.21603 -8.01149 26291 8108020004 ABUSUR MALUKU 803 Pre-Electrified - - - 127.19565 -8.01100 26292 8108020005 KOTA LAMA MALUKU 833 Pre-Electrified - - - 127.17588 -7.99910 26293 8108020006 WONRELI MALUKU 6 652 Pre-Electrified - - - 127.19342 -7.99455 26294 8108020007 NOMAHA MALUKU 640 Pre-Electrified - - - 127.20766 -7.97290 26295 8108020008 PUR- PURA MALUKU 398 Pre-Electrified - - - 127.20950 -7.96205 26296 8108020009 LEBELAU MALUKU 1 852 Pre-Electrified - - - 127.18835 -7.96442 26297 8108020010 JERUSU MALUKU 96 MiniGrid Systems 24 24 624 4.7 127.39523 -7.64079 26298 8108020010 JERUSU MALUKU 44 MiniGrid Systems 11 11 286 2.1 127.60557 -7.61393 26299 8108020010 JERUSU MALUKU 105 MiniGrid Systems 26 26 676 5.0 127.59890 -7.60082 26300 8108020010 JERUSU MALUKU 70 MiniGrid Systems 17 17 442 3.3 127.59713 -7.59489 26301 8108020010 JERUSU MALUKU 123 MiniGrid Systems 30 30 780 5.8 127.60329 -7.59151 26302 8108030001 NUWEWANG MALUKU 348 Pre-Electrified - - - 127.61723 -8.20571 26303 8108030001 NUWEWANG MALUKU 621 Pre-Electrified - - - 127.63456 -8.18501 26304 8108030001 NUWEWANG MALUKU 37 Pre-Electrified - - - 127.63556 -8.18365 26305 8108030002 TOMRA MALUKU 71 Pre-Electrified - - - 127.66174 -8.17120 26306 8108030002 TOMRA MALUKU 319 Pre-Electrified - - - 127.65297 -8.17561 26307 8108030002 TOMRA MALUKU 907 Pre-Electrified - - - 127.65492 -8.17170 26308 8108030002 TOMRA MALUKU 831 Pre-Electrified - - - 127.65992 -8.16853 26309 8108030002 TOMRA MALUKU 227 Pre-Electrified - - - 127.65371 -8.18149 26310 8108030002 TOMRA MALUKU 238 Pre-Electrified - - - 127.65781 -8.18182 26311 8108030004 LUHULELY MALUKU 1 198 Pre-Electrified - - - 127.70946 -8.20763 26312 8108030005 TUTUKEY MALUKU 1 140 Pre-Electrified - - - 127.67768 -8.15910 26313 8108030006 BATUMIAU MALUKU 1 007 Pre-Electrified - - - 127.70288 -8.16385 26314 8108030007 LAITUTUN MALUKU 364 Pre-Electrified - - - 127.73543 -8.20404 26315 8108030007 LAITUTUN MALUKU 357 Pre-Electrified - - - 127.74045 -8.17934 26316 8108040004 WERWARU MALUKU 221 MiniGrid Systems 46 47 196 8.9 127.90375 -8.21378 26317 8108040005 KLIS MALUKU 79 MiniGrid Systems 17 17 442 3.3 127.98939 -8.14306 26318 8108040006 TOUNWAWAN MALUKU 39 MiniGrid Systems 14 14 364 2.7 128.06731 -8.14509 26319 8108040007 MOAIN MALUKU 261 MiniGrid Systems 61 62 586 11.8 128.07737 -8.18778 Annex II – Demand forecast results Page 192 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 26320 8108050001 WULUR MALUKU 1 497 MiniGrid Systems 264 270 864 51.2 128.62287 -7.19150 26321 8108050002 BATUMERAH MALUKU 704 MiniGrid Systems 184 188 784 35.7 128.58836 -7.07265 26322 8108050003 KUAY MELU MALUKU 288 MiniGrid Systems 62 63 612 12.0 128.59379 -7.11651 26323 8108050004 KUMUR MALUKU 452 MiniGrid Systems 77 79 002 14.9 128.61987 -7.10921 26324 8108050005 BEBAR TIMUR MALUKU 961 MiniGrid Systems 145 148 770 28.1 128.63895 -7.12183 26325 8108050006 ILIH MALUKU 541 MiniGrid Systems 81 83 106 15.7 128.68162 -7.12124 26326 8108050007 KEHLI MALUKU 1 128 MiniGrid Systems 258 264 708 50.1 128.66862 -7.14290 26327 8108070009 TELA MALUKU 322 Pre-Electrified - - - 129.69412 -8.02517 26328 8108070009 TELA MALUKU 140 Pre-Electrified - - - 129.67264 -8.00813 26329 8108070009 TELA MALUKU 752 Pre-Electrified - - - 129.67084 -8.00572 26330 8108070010 IMROING MALUKU 539 Pre-Electrified - - - 129.64823 -7.96704 26331 8108070011 TEPA MALUKU 1 720 Pre-Electrified - - - 129.59475 -7.86980 26332 8108070011 TEPA MALUKU 185 Pre-Electrified - - - 129.59673 -7.86490 26333 8108070012 LETSIARA MALUKU 71 Pre-Electrified - - - 129.59568 -7.86639 26334 8108070012 LETSIARA MALUKU 312 Pre-Electrified - - - 129.59544 -7.86450 26335 8108070012 LETSIARA MALUKU 78 Pre-Electrified - - - 129.59266 -7.83010 26336 8108070013 MANUWUI MALUKU 391 MiniGrid Systems 32 32 832 6.2 129.68781 -7.84038 26337 8108070014 HERTUTI MALUKU 232 MiniGrid Systems 49 50 274 9.5 129.68256 -7.56624 26338 8108070015 LEWAH MALUKU 224 MiniGrid Systems 61 62 586 11.8 129.69737 -7.56911 26339 8108070016 SINAIRUSI MALUKU 334 MiniGrid Systems 64 65 664 12.4 129.66496 -7.55003 26340 8108080009 SERILI MALUKU - Pre-Electrified - - - 129.87493 -8.12415 26341 8108080011 BULULORA MALUKU 50 MiniGrid Systems 17 17 442 3.3 129.88985 -8.13982 26342 8108080013 TUTUWAWANG MALUKU 336 MiniGrid Systems 31 31 806 6.0 129.75117 -7.99133 26343 8108080014 MANUARI MALUKU 413 Pre-Electrified - - - 129.80637 -8.00146 26344 8108080015 ANALUTUR MALUKU 261 Pre-Electrified - - - 129.81352 -7.99482 26345 8108080015 ANALUTUR MALUKU 123 Pre-Electrified - - - 129.81590 -7.98905 26346 8108080016 AHANARI MALUKU 154 Pre-Electrified - - - 129.81621 -7.98837 26347 8108080016 AHANARI MALUKU 711 Pre-Electrified - - - 129.82023 -7.97310 26348 8108080018 KOKWARI MALUKU 467 Pre-Electrified - - - 129.84011 -7.94426 26349 8108080018 KOKWARI MALUKU 280 Pre-Electrified - - - 129.86182 -7.91919 26350 8108080020 KROING MALUKU 636 Pre-Electrified - - - 129.85886 -7.90014 26351 8108080024 ILMARANG MALUKU 222 MiniGrid Systems 64 65 664 12.4 129.99592 -7.73747 26352 8108080025 WELORA MALUKU 161 MiniGrid Systems 40 41 040 7.8 129.99466 -7.71681 26353 8108080026 LETMASA MALUKU 161 MiniGrid Systems 45 46 170 8.7 130.00614 -7.73807 26354 8108080027 WATUWEY MALUKU 350 MiniGrid Systems 93 95 418 18.0 130.04400 -7.77076 26355 8108080028 WAIRATAN MALUKU 211 MiniGrid Systems 62 63 612 12.0 130.07192 -7.77929 26356 8108080029 NURNYAMAN MALUKU 216 MiniGrid Systems 45 46 170 8.7 130.07193 -7.77998 26357 8109010002 WAEPANDAN MALUKU 823 Pre-Electrified - - - 126.04128 -3.39726 26358 8109010002 WAEPANDAN MALUKU 263 Pre-Electrified - - - 126.03875 -3.39545 26359 8109010003 FOGI MALUKU 48 MiniGrid Systems 12 12 312 2.3 126.01452 -3.36815 26360 8109020007 MEPA MALUKU 8 OffGrid Systems 2 2 052 0.4 126.49610 -3.77276 26361 8109020008 LEKSULA MALUKU 9 OffGrid Systems 2 2 052 0.4 126.49637 -3.77276 26362 8109020009 NALBESSY MALUKU 868 Pre-Electrified - - - 126.54666 -3.78988 26363 8109020009 NALBESSY MALUKU 16 Pre-Electrified - - - 126.54764 -3.75979 26364 8109020016 NUSARUA MALUKU 93 MiniGrid Systems 21 21 546 4.1 126.44427 -3.67374 26365 8109020017 NEATH MALUKU 568 Pre-Electrified - - - 126.55022 -3.75625 26366 8109020020 WAEKATIN MALUKU 26 MiniGrid Systems 11 11 286 2.1 126.58221 -3.54661 26367 8109020020 WAEKATIN MALUKU 7 OffGrid Systems 3 3 078 0.6 126.58128 -3.54462 26368 8109030002 WAENALUT MALUKU 63 MiniGrid Systems 14 14 364 2.7 126.70231 -3.57638 26369 8109030002 WAENALUT MALUKU 61 MiniGrid Systems 14 14 364 2.7 126.69248 -3.56167 26370 8109030002 WAENALUT MALUKU 20 Pre-Electrified - - - 126.73489 -3.50420 26371 8109030002 WAENALUT MALUKU 6 OffGrid Systems 2 2 052 0.4 126.81724 -3.60106 26372 8109030003 LEKTAMA MALUKU 211 MiniGrid Systems 43 44 118 8.3 126.69332 -3.81222 26373 8109030004 FATMITE MALUKU 341 MiniGrid Systems 80 82 080 15.5 126.78493 -3.71172 26374 8109030006 LEKU MALUKU 45 MiniGrid Systems 13 13 338 2.5 126.78253 -3.81990 26375 8109030007 OKI LAMA MALUKU 1 OffGrid Systems 1 1 026 0.2 126.87929 -3.78131 26376 8109030009 LABUANG MALUKU 85 MiniGrid Systems 25 25 650 4.9 126.74099 -3.80990 26377 8109030010 WALI MALUKU 4 OffGrid Systems 1 1 026 0.2 126.76289 -3.83251 26378 8109040003 WAELIKUT MALUKU 43 MiniGrid Systems 9 9 234 1.7 126.93987 -3.76727 26379 8109040006 WAESILI MALUKU 1 194 Pre-Electrified - - - 127.17402 -3.63610 26380 8109040007 WAETAWA MALUKU 930 Pre-Electrified - - - 127.20626 -3.64212 26381 8171010001 LATUHALAT MALUKU 333 Pre-Electrified - - - 128.11952 -3.77928 26382 8171010001 LATUHALAT MALUKU 786 Pre-Electrified - - - 128.12160 -3.77789 26383 8171010001 LATUHALAT MALUKU 940 Pre-Electrified - - - 128.12572 -3.77346 26384 8171010001 LATUHALAT MALUKU 1 216 Pre-Electrified - - - 128.12042 -3.77097 26385 8171010001 LATUHALAT MALUKU 667 Pre-Electrified - - - 128.12271 -3.77001 26386 8171010001 LATUHALAT MALUKU 535 Pre-Electrified - - - 128.12240 -3.76690 26387 8171010002 SEILALE MALUKU 635 Pre-Electrified - - - 128.11825 -3.76668 26388 8171010002 SEILALE MALUKU 748 Pre-Electrified - - - 128.12321 -3.76480 26389 8171010003 NUSANIWE MALUKU 37 Pre-Electrified - - - 128.12682 -3.77303 26390 8171010003 NUSANIWE MALUKU 552 Pre-Electrified - - - 128.13297 -3.77251 26391 8171010003 NUSANIWE MALUKU 112 Pre-Electrified - - - 128.12441 -3.76338 26392 8171010003 NUSANIWE MALUKU 1 625 Pre-Electrified - - - 128.13160 -3.75328 26393 8171010003 NUSANIWE MALUKU 267 Pre-Electrified - - - 128.13388 -3.74899 26394 8171010003 NUSANIWE MALUKU 433 Pre-Electrified - - - 128.13127 -3.74887 26395 8171010004 AMAHUSU MALUKU 961 Pre-Electrified - - - 128.14732 -3.72524 26396 8171010004 AMAHUSU MALUKU 3 846 Pre-Electrified - - - 128.14742 -3.72291 26397 8171010005 KEL NUSANIWE MALUKU 7 647 Pre-Electrified - - - 128.15658 -3.70973 26398 8171010006 KEL BENTENG MALUKU 12 499 Pre-Electrified - - - 128.16234 -3.70917 26399 8171010007 KEL WAINITU MALUKU 7 940 Pre-Electrified - - - 128.16994 -3.70448 26400 8171010008 KEL KUDAMATI MALUKU 31 Pre-Electrified - - - 128.17639 -3.71151 26401 8171010008 KEL KUDAMATI MALUKU 16 955 Pre-Electrified - - - 128.17157 -3.70800 26402 8171010009 URIMESING MALUKU 874 Pre-Electrified - - - 128.16588 -3.74825 26403 8171010009 URIMESING MALUKU 180 Pre-Electrified - - - 128.19638 -3.74091 26404 8171010009 URIMESING MALUKU 56 Pre-Electrified - - - 128.19607 -3.73677 Annex II – Demand forecast results Page 193 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 26405 8171010009 URIMESING MALUKU 1 368 Pre-Electrified - - - 128.19077 -3.72522 26406 8171010009 URIMESING MALUKU 322 Pre-Electrified - - - 128.19159 -3.72320 26407 8171010009 URIMESING MALUKU 554 Pre-Electrified - - - 128.19045 -3.72096 26408 8171010009 URIMESING MALUKU 202 Pre-Electrified - - - 128.18969 -3.71887 26409 8171010009 URIMESING MALUKU 443 Pre-Electrified - - - 128.19203 -3.71841 26410 8171010009 URIMESING MALUKU 438 Pre-Electrified - - - 128.19110 -3.71623 26411 8171010009 URIMESING MALUKU 665 Pre-Electrified - - - 128.16899 -3.71272 26412 8171010009 URIMESING MALUKU 220 Pre-Electrified - - - 128.17666 -3.71193 26413 8171010009 URIMESING MALUKU 14 Pre-Electrified - - - 128.18618 -3.71123 26414 8171010009 URIMESING MALUKU 145 Pre-Electrified - - - 128.18285 -3.70828 26415 8171010009 URIMESING MALUKU 1 229 Pre-Electrified - - - 128.17052 -3.71197 26416 8171010010 KEL MANGGA DUA MALUKU 3 358 Pre-Electrified - - - 128.17771 -3.70509 26417 8171010011 KEL URIMESING MALUKU 3 031 Pre-Electrified - - - 128.18041 -3.70339 26418 8171010012 KEL WAIHAONG MALUKU 6 308 Pre-Electrified - - - 128.17547 -3.70127 26419 8171010013 KEL SILALE MALUKU 4 858 Pre-Electrified - - - 128.17654 -3.69907 26420 8171020006 SOYA MALUKU 845 Pre-Electrified - - - 128.21287 -3.71084 26421 8171020006 SOYA MALUKU 1 023 Pre-Electrified - - - 128.19697 -3.70074 26422 8171020006 SOYA MALUKU 5 296 Pre-Electrified - - - 128.19789 -3.70670 26423 8171020008 KEL KARANG PANJANG MALUKU 6 861 Pre-Electrified - - - 128.19065 -3.69387 26424 8171020009 KEL BATU MEJA MALUKU 10 339 Pre-Electrified - - - 128.18849 -3.70066 26425 8171020010 KEL BATU GAJA MALUKU 986 Pre-Electrified - - - 128.18784 -3.71052 26426 8171020010 KEL BATU GAJA MALUKU 331 Pre-Electrified - - - 128.18630 -3.70937 26427 8171020010 KEL BATU GAJA MALUKU 271 Pre-Electrified - - - 128.18328 -3.70779 26428 8171020010 KEL BATU GAJA MALUKU 5 250 Pre-Electrified - - - 128.18512 -3.70357 26429 8171020011 KEL AHUSEN MALUKU 3 254 Pre-Electrified - - - 128.18243 -3.69967 26430 8171020012 KEL HONIPOPU MALUKU 3 532 Pre-Electrified - - - 128.17901 -3.69580 26431 8171020013 URITETU MALUKU 4 237 Pre-Electrified - - - 128.18348 -3.69523 26432 8171020014 KEL RIJALI MALUKU 5 103 Pre-Electrified - - - 128.18515 -3.68903 26433 8171020015 KEL AMANTELU MALUKU 78 Pre-Electrified - - - 128.19586 -3.68511 26434 8171020015 KEL AMANTELU MALUKU 8 079 Pre-Electrified - - - 128.19421 -3.68960 26435 8171020016 BATU MERAH MALUKU 219 Pre-Electrified - - - 128.19494 -3.68507 26436 8171020016 BATU MERAH MALUKU 24 445 Pre-Electrified - - - 128.19532 -3.68058 26437 8171020017 PANDAN KASTURI MALUKU 178 Pre-Electrified - - - 128.19651 -3.67480 26438 8171020017 PANDAN KASTURI MALUKU 4 824 Pre-Electrified - - - 128.19160 -3.67745 26439 8171020018 HATIVE KECIL MALUKU 119 Pre-Electrified - - - 128.20297 -3.67623 26440 8171020018 HATIVE KECIL MALUKU 20 Pre-Electrified - - - 128.19758 -3.67372 26441 8171020018 HATIVE KECIL MALUKU 8 541 Pre-Electrified - - - 128.20118 -3.66940 26442 8171020019 GALALA MALUKU 1 345 Pre-Electrified - - - 128.20040 -3.66566 26443 8171021001 NAKU MALUKU 590 Pre-Electrified - - - 128.22195 -3.73624 26444 8171021001 NAKU MALUKU 100 Pre-Electrified - - - 128.22380 -3.73586 26445 8171021002 KILANG MALUKU 451 Pre-Electrified - - - 128.22620 -3.74176 26446 8171021002 KILANG MALUKU 341 Pre-Electrified - - - 128.22726 -3.74017 26447 8171021002 KILANG MALUKU 111 Pre-Electrified - - - 128.22419 -3.73502 26448 8171021003 HUKURILA MALUKU 513 Pre-Electrified - - - 128.23855 -3.73847 26449 8171021003 HUKURILA MALUKU 145 Pre-Electrified - - - 128.23991 -3.73795 26450 8171021004 EMA MALUKU 149 Pre-Electrified - - - 128.23373 -3.73405 26451 8171021004 EMA MALUKU 61 Pre-Electrified - - - 128.23419 -3.73213 26452 8171021004 EMA MALUKU 175 Pre-Electrified - - - 128.23386 -3.73189 26453 8171021004 EMA MALUKU 333 Pre-Electrified - - - 128.23237 -3.73192 26454 8171021004 EMA MALUKU 67 Pre-Electrified - - - 128.23311 -3.73048 26455 8171021005 HATALAE MALUKU 224 Pre-Electrified - - - 128.21622 -3.72717 26456 8171021005 HATALAE MALUKU 805 Pre-Electrified - - - 128.21598 -3.72635 26457 8171021006 HUTUMURI MALUKU 86 Pre-Electrified - - - 128.27764 -3.69870 26458 8171021006 HUTUMURI MALUKU 74 Pre-Electrified - - - 128.27996 -3.69812 26459 8171021006 HUTUMURI MALUKU 1 714 Pre-Electrified - - - 128.28410 -3.69742 26460 8171021006 HUTUMURI MALUKU 1 071 Pre-Electrified - - - 128.29935 -3.67858 26461 8171021006 HUTUMURI MALUKU 114 Pre-Electrified - - - 128.28594 -3.65516 26462 8171021006 HUTUMURI MALUKU 263 Pre-Electrified - - - 128.28494 -3.65440 26463 8171021006 HUTUMURI MALUKU 603 Pre-Electrified - - - 128.27352 -3.64482 26464 8171021007 RUTONG MALUKU 584 Pre-Electrified - - - 128.26704 -3.70334 26465 8171021007 RUTONG MALUKU 229 Pre-Electrified - - - 128.27263 -3.70058 26466 8171021008 LEAHARI MALUKU 572 Pre-Electrified - - - 128.26859 -3.71019 26467 8171030009 WAIHERU MALUKU 350 Pre-Electrified - - - 128.21452 -3.63211 26468 8171030009 WAIHERU MALUKU 1 Pre-Electrified - - - 128.21332 -3.63221 26469 8171030009 WAIHERU MALUKU 4 394 Pre-Electrified - - - 128.21859 -3.63026 26470 8171030009 WAIHERU MALUKU 7 635 Pre-Electrified - - - 128.22493 -3.62769 26471 8171030010 NANIA MALUKU 3 192 Pre-Electrified - - - 128.23016 -3.62789 26472 8171030011 NEGERI LAMA MALUKU 62 Pre-Electrified - - - 128.24126 -3.62645 26473 8171030011 NEGERI LAMA MALUKU 41 Pre-Electrified - - - 128.24515 -3.62808 26474 8171030011 NEGERI LAMA MALUKU 1 491 Pre-Electrified - - - 128.23852 -3.62898 26475 8171030011 NEGERI LAMA MALUKU 1 Pre-Electrified - - - 128.24566 -3.62263 26476 8171030011 NEGERI LAMA MALUKU 91 Pre-Electrified - - - 128.24442 -3.62185 26477 8171030011 NEGERI LAMA MALUKU 59 Pre-Electrified - - - 128.23622 -3.62906 26478 8171030012 PASSO MALUKU - Pre-Electrified - - - 128.24550 -3.64055 26479 8171030012 PASSO MALUKU 584 Pre-Electrified - - - 128.24318 -3.63367 26480 8171030012 PASSO MALUKU 582 Pre-Electrified - - - 128.24728 -3.62611 26481 8171030012 PASSO MALUKU - Pre-Electrified - - - 128.24246 -3.63242 26482 8171030012 PASSO MALUKU 283 Pre-Electrified - - - 128.24728 -3.62320 26483 8171030012 PASSO MALUKU 1 321 Pre-Electrified - - - 128.24811 -3.63620 26484 8171030012 PASSO MALUKU 4 Pre-Electrified - - - 128.27143 -3.64357 26485 8171030012 PASSO MALUKU 14 597 Pre-Electrified - - - 128.25456 -3.62783 26486 8171030012 PASSO MALUKU 285 Pre-Electrified - - - 128.27178 -3.61729 26487 8171030013 LATERI MALUKU 273 Pre-Electrified - - - 128.23921 -3.65012 26488 8171030013 LATERI MALUKU 3 721 Pre-Electrified - - - 128.23885 -3.64287 26489 8171030014 HALONG MALUKU 88 Pre-Electrified - - - 128.20957 -3.66566 Annex II – Demand forecast results Page 194 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 26490 8171030014 HALONG MALUKU 53 Pre-Electrified - - - 128.22100 -3.66478 26491 8171030014 HALONG MALUKU 95 Pre-Electrified - - - 128.22470 -3.66471 26492 8171030014 HALONG MALUKU 69 Pre-Electrified - - - 128.21016 -3.66421 26493 8171030014 HALONG MALUKU 69 Pre-Electrified - - - 128.20991 -3.66335 26494 8171030014 HALONG MALUKU 754 Pre-Electrified - - - 128.20531 -3.66364 26495 8171030014 HALONG MALUKU 166 Pre-Electrified - - - 128.21477 -3.66266 26496 8171030014 HALONG MALUKU 101 Pre-Electrified - - - 128.21634 -3.65956 26497 8171030014 HALONG MALUKU 48 Pre-Electrified - - - 128.22152 -3.65789 26498 8171030014 HALONG MALUKU 447 Pre-Electrified - - - 128.21875 -3.65843 26499 8171030014 HALONG MALUKU 69 Pre-Electrified - - - 128.21606 -3.65707 26500 8171030014 HALONG MALUKU 3 506 Pre-Electrified - - - 128.21708 -3.66079 26501 8171030014 HALONG MALUKU 70 Pre-Electrified - - - 128.22059 -3.65592 26502 8171030014 HALONG MALUKU 117 Pre-Electrified - - - 128.23213 -3.65453 26503 8171030014 HALONG MALUKU 2 200 Pre-Electrified - - - 128.22898 -3.65250 26504 8171030015 LATTA MALUKU 1 724 Pre-Electrified - - - 128.23435 -3.65245 26505 8171031001 LAHA MALUKU 754 Pre-Electrified - - - 128.08795 -3.71782 26506 8171031001 LAHA MALUKU 23 Pre-Electrified - - - 128.10099 -3.70700 26507 8171031001 LAHA MALUKU 15 Pre-Electrified - - - 128.10052 -3.70672 26508 8171031001 LAHA MALUKU 692 Pre-Electrified - - - 128.08627 -3.70454 26509 8171031001 LAHA MALUKU 435 Pre-Electrified - - - 128.09703 -3.70111 26510 8171031001 LAHA MALUKU 26 Pre-Electrified - - - 128.09508 -3.70029 26511 8171031001 LAHA MALUKU 169 Pre-Electrified - - - 128.09414 -3.69905 26512 8171031002 TAWIRI MALUKU 41 Pre-Electrified - - - 128.09883 -3.70068 26513 8171031002 TAWIRI MALUKU - Pre-Electrified - - - 128.09518 -3.69989 26514 8171031002 TAWIRI MALUKU 2 624 Pre-Electrified - - - 128.10292 -3.70121 26515 8171031002 TAWIRI MALUKU 112 Pre-Electrified - - - 128.10185 -3.69805 26516 8171031002 TAWIRI MALUKU 41 Pre-Electrified - - - 128.10264 -3.69753 26517 8171031002 TAWIRI MALUKU 32 Pre-Electrified - - - 128.10087 -3.69739 26518 8171031002 TAWIRI MALUKU 928 Pre-Electrified - - - 128.09643 -3.69843 26519 8171031002 TAWIRI MALUKU 38 Pre-Electrified - - - 128.09929 -3.69750 26520 8171031002 TAWIRI MALUKU 17 Pre-Electrified - - - 128.09977 -3.69720 26521 8171031002 TAWIRI MALUKU 156 Pre-Electrified - - - 128.10034 -3.69663 26522 8171031002 TAWIRI MALUKU 262 Pre-Electrified - - - 128.10964 -3.68967 26523 8171031002 TAWIRI MALUKU 15 Pre-Electrified - - - 128.11532 -3.68733 26524 8171031002 TAWIRI MALUKU 24 Pre-Electrified - - - 128.11571 -3.68703 26525 8171031002 TAWIRI MALUKU 280 Pre-Electrified - - - 128.11342 -3.68819 26526 8171031002 TAWIRI MALUKU 722 Pre-Electrified - - - 128.11959 -3.68543 26527 8171031002 TAWIRI MALUKU 217 Pre-Electrified - - - 128.11103 -3.68378 26528 8171031002 TAWIRI MALUKU 115 Pre-Electrified - - - 128.11029 -3.68063 26529 8171031003 HATIVE BESAR MALUKU 2 Pre-Electrified - - - 128.12079 -3.68490 26530 8171031003 HATIVE BESAR MALUKU 972 Pre-Electrified - - - 128.12374 -3.68432 26531 8171031003 HATIVE BESAR MALUKU 375 Pre-Electrified - - - 128.13642 -3.67728 26532 8171031003 HATIVE BESAR MALUKU 429 Pre-Electrified - - - 128.14498 -3.67185 26533 8171031003 HATIVE BESAR MALUKU 152 Pre-Electrified - - - 128.14730 -3.67082 26534 8171031003 HATIVE BESAR MALUKU 2 272 Pre-Electrified - - - 128.15814 -3.66454 26535 8171031003 HATIVE BESAR MALUKU 441 Pre-Electrified - - - 128.16177 -3.66562 26536 8171031004 WAIYAME MALUKU 4 516 Pre-Electrified - - - 128.16660 -3.66295 26537 8171031005 RUMAH TIGA MALUKU 195 Pre-Electrified - - - 128.18809 -3.66049 26538 8171031005 RUMAH TIGA MALUKU 688 Pre-Electrified - - - 128.17825 -3.66073 26539 8171031005 RUMAH TIGA MALUKU 4 073 Pre-Electrified - - - 128.19564 -3.65919 26540 8171031005 RUMAH TIGA MALUKU 127 Pre-Electrified - - - 128.17200 -3.65807 26541 8171031005 RUMAH TIGA MALUKU 123 Pre-Electrified - - - 128.18149 -3.65543 26542 8171031005 RUMAH TIGA MALUKU 124 Pre-Electrified - - - 128.17222 -3.65493 26543 8171031005 RUMAH TIGA MALUKU 1 676 Pre-Electrified - - - 128.18454 -3.65630 26544 8171031005 RUMAH TIGA MALUKU 46 Pre-Electrified - - - 128.18822 -3.64830 26545 8171031006 TIHU MALUKU 288 Pre-Electrified - - - 128.18487 -3.65410 26546 8171031006 TIHU MALUKU 77 Pre-Electrified - - - 128.18874 -3.65196 26547 8171031006 TIHU MALUKU 388 Pre-Electrified - - - 128.18827 -3.64918 26548 8171031007 POKA MALUKU 534 Pre-Electrified - - - 128.19922 -3.65908 26549 8171031007 POKA MALUKU 463 Pre-Electrified - - - 128.19826 -3.65547 26550 8171031007 POKA MALUKU 183 Pre-Electrified - - - 128.19728 -3.65354 26551 8171031007 POKA MALUKU 2 366 Pre-Electrified - - - 128.19237 -3.64854 26552 8171031007 POKA MALUKU 1 124 Pre-Electrified - - - 128.19796 -3.63832 26553 8171031008 HUNUTH/DURIAN PATAH MALUKU - Pre-Electrified - - - 128.19880 -3.63706 26554 8171031008 HUNUTH/DURIAN PATAH MALUKU 365 Pre-Electrified - - - 128.20092 -3.63639 26555 8171031008 HUNUTH/DURIAN PATAH MALUKU 298 Pre-Electrified - - - 128.20824 -3.63441 26556 8171031008 HUNUTH/DURIAN PATAH MALUKU 15 Pre-Electrified - - - 128.21430 -3.63120 26557 8171031008 HUNUTH/DURIAN PATAH MALUKU 379 Pre-Electrified - - - 128.21237 -3.63188 26558 8171031008 HUNUTH/DURIAN PATAH MALUKU 24 Pre-Electrified - - - 128.20298 -3.63001 26559 8171031008 HUNUTH/DURIAN PATAH MALUKU 259 Pre-Electrified - - - 128.19441 -3.62880 26560 8171031008 HUNUTH/DURIAN PATAH MALUKU 241 Pre-Electrified - - - 128.20369 -3.62786 26561 8171031008 HUNUTH/DURIAN PATAH MALUKU 117 Pre-Electrified - - - 128.19553 -3.62679 26562 8171031008 HUNUTH/DURIAN PATAH MALUKU 139 Pre-Electrified - - - 128.20107 -3.62484 26563 8171031008 HUNUTH/DURIAN PATAH MALUKU - Pre-Electrified - - - 128.21397 -3.63006 26564 8171031008 HUNUTH/DURIAN PATAH MALUKU 765 Pre-Electrified - - - 128.18946 -3.62083 26565 8171031008 HUNUTH/DURIAN PATAH MALUKU 22 Pre-Electrified - - - 128.18918 -3.61718 26566 8171031008 HUNUTH/DURIAN PATAH MALUKU 170 Pre-Electrified - - - 128.19015 -3.60816 26567 8172010001 TUBYAL MALUKU 833 MiniGrid Systems 23 23 598 4.5 132.00233 -5.33120 26568 8172010002 FINUALEN MALUKU 306 MiniGrid Systems 14 14 364 2.7 132.00939 -5.32416 26569 8172010003 LOKWIRIN MALUKU 469 MiniGrid Systems 26 26 676 5.0 132.01255 -5.31451 26570 8172010004 KAIMEAR MALUKU 481 MiniGrid Systems 90 92 340 17.5 132.02016 -5.16821 26571 8172010005 KANARA MALUKU 344 MiniGrid Systems 24 24 624 4.7 131.99228 -5.34040 26572 8172010006 WARKAR MALUKU 383 MiniGrid Systems 9 9 234 1.7 131.98542 -5.35139 26573 8172010007 YAPAS MALUKU 137 OffGrid Systems 1 1 026 0.2 131.99063 -5.36263 26574 8172010008 ROMOIN MALUKU 939 MiniGrid Systems 36 36 936 7.0 131.97822 -5.37055 Annex II – Demand forecast results Page 195 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 26575 8172010009 HIRIT MALUKU 296 MiniGrid Systems 58 59 508 11.3 131.97737 -5.38161 26576 8172010010 MANGUR NIELA MALUKU 421 MiniGrid Systems 84 86 184 16.3 131.96188 -5.60331 26577 8172010011 TIFLEAN MALUKU 286 MiniGrid Systems 55 56 430 10.7 132.00821 -5.57955 26578 8172030001 FIDITAN MALUKU 4 759 Pre-Electrified - - - 132.74230 -5.63730 26579 8172030002 NGADI MALUKU 1 367 Pre-Electrified - - - 132.77035 -5.58166 26580 8172030004 TAMEDAN MALUKU 1 366 Pre-Electrified - - - 132.79476 -5.52984 26581 8172030005 OHOITAHIT MALUKU 1 454 Pre-Electrified - - - 132.80122 -5.59999 26582 8172030006 OHOITEL MALUKU 1 021 Pre-Electrified - - - 132.79730 -5.61758 26583 8172030006 OHOITEL MALUKU 2 085 Pre-Electrified - - - 132.79656 -5.60827 26584 8172040001 TAAR MALUKU 1 299 Pre-Electrified - - - 132.74780 -5.65873 26585 8172040001 TAAR MALUKU 4 108 Pre-Electrified - - - 132.75289 -5.64497 26586 8172040002 KEL. KETSOBLAK MALUKU 2 175 Pre-Electrified - - - 132.74745 -5.64051 26587 8172040002 KEL. KETSOBLAK MALUKU 3 580 Pre-Electrified - - - 132.75331 -5.60744 26588 8172040003 TUAL MALUKU 3 978 Pre-Electrified - - - 132.75186 -5.62299 26589 8172040003 TUAL MALUKU 2 311 Pre-Electrified - - - 132.74803 -5.61186 26590 8172040004 KEL. MASRUM MALUKU 4 605 Pre-Electrified - - - 132.74632 -5.63042 26591 8172040005 KEL. LODAR EL MALUKU 6 930 Pre-Electrified - - - 132.75205 -5.63187 26592 8201090015 BUKU BUALAWA MALUKU UTARA 985 Pre-Electrified - - - 127.50712 0.98086 26593 8201090016 TAURO MALUKU UTARA 1 058 Pre-Electrified - - - 127.50259 0.98790 26594 8201090017 MATUI MALUKU UTARA 338 Pre-Electrified - - - 127.49126 1.01276 26595 8201090018 TUADA MALUKU UTARA 756 Pre-Electrified - - - 127.49778 1.05345 26596 8201090019 TODOWONGI MALUKU UTARA 718 Pre-Electrified - - - 127.49896 1.05655 26597 8201090021 PORNITI MALUKU UTARA 1 065 Pre-Electrified - - - 127.48478 1.08143 26598 8201090021 PORNITI MALUKU UTARA 323 Pre-Electrified - - - 127.49449 1.07859 26599 8201090022 GAMLAMO MALUKU UTARA 983 Pre-Electrified - - - 127.47124 1.06820 26600 8201090023 GUFASA MALUKU UTARA 1 106 Pre-Electrified - - - 127.46755 1.06310 26601 8201090024 GUAEMAADU MALUKU UTARA 1 615 Pre-Electrified - - - 127.46408 1.05884 26602 8201090025 GALALA MALUKU UTARA 1 192 Pre-Electrified - - - 127.45639 1.05755 26603 8201090026 BOBANEHENA MALUKU UTARA 1 463 Pre-Electrified - - - 127.44767 1.05384 26604 8201090027 SARIA MALUKU UTARA 579 Pre-Electrified - - - 127.41301 1.04069 26605 8201090028 PAYO MALUKU UTARA 1 498 Pre-Electrified - - - 127.42168 1.05250 26606 8201090029 BOBO MALUKU UTARA 1 147 Pre-Electrified - - - 127.41121 1.05150 26607 8201090030 IDAMDEHE MALUKU UTARA 264 Pre-Electrified - - - 127.41441 1.08734 26608 8201090031 IDAMDEHE GAMSUNGI MALUKU UTARA 400 Pre-Electrified - - - 127.41270 1.08970 26609 8201090032 JALAN BARU MALUKU UTARA 1 387 Pre-Electrified - - - 127.46793 1.06966 26610 8201090033 MARIMABATI MALUKU UTARA 1 Pre-Electrified - - - 127.43313 1.11124 26611 8201090033 MARIMABATI MALUKU UTARA 261 Pre-Electrified - - - 127.42759 1.10970 26612 8201090034 GAMTALA MALUKU UTARA 642 Pre-Electrified - - - 127.43602 1.11065 26613 8201090035 SOAKONORA MALUKU UTARA 1 505 Pre-Electrified - - - 127.47063 1.07219 26614 8201090036 LOLORI MALUKU UTARA 569 Pre-Electrified - - - 127.45038 1.11000 26615 8201090037 TABOSO MALUKU UTARA 265 Pre-Electrified - - - 127.45461 1.10849 26616 8201090037 TABOSO MALUKU UTARA 301 Pre-Electrified - - - 127.46159 1.10536 26617 8201090038 HOKU HOKU KIE MALUKU UTARA 698 Pre-Electrified - - - 127.47056 1.09262 26618 8201090039 ACANGO MALUKU UTARA 1 Pre-Electrified - - - 127.47417 1.08697 26619 8201090039 ACANGO MALUKU UTARA 409 Pre-Electrified - - - 127.47762 1.09357 26620 8201090039 ACANGO MALUKU UTARA 7 Pre-Electrified - - - 127.47305 1.08888 26621 8201090040 TEDENG MALUKU UTARA 1 659 Pre-Electrified - - - 127.47882 1.10386 26622 8201090041 AKEDIRI MALUKU UTARA 2 719 Pre-Electrified - - - 127.48310 1.11702 26623 8201090048 GUAERIA MALUKU UTARA 263 Pre-Electrified - - - 127.47628 1.00851 26624 8201090049 HATEBICARA MALUKU UTARA 950 Pre-Electrified - - - 127.47321 1.08390 26625 8201090049 HATEBICARA MALUKU UTARA 20 Pre-Electrified - - - 127.47812 1.08259 26626 8201091001 RIORIBATI MALUKU UTARA 611 Pre-Electrified - - - 127.62491 0.78108 26627 8201091002 TONIKU MALUKU UTARA 904 Pre-Electrified - - - 127.62151 0.79777 26628 8201091003 TEWE MALUKU UTARA 371 Pre-Electrified - - - 127.63875 0.81991 26629 8201091004 DODINGA MALUKU UTARA 650 Pre-Electrified - - - 127.64698 0.85879 26630 8201091004 DODINGA MALUKU UTARA 376 Pre-Electrified - - - 127.64373 0.85566 26631 8201091004 DODINGA MALUKU UTARA 25 MiniGrid Systems 6 6 156 1.2 127.67573 0.83070 26632 8201091005 AKELAHA MALUKU UTARA 274 Pre-Electrified - - - 127.61318 0.86080 26633 8201091007 TUGURACI MALUKU UTARA 388 Pre-Electrified - - - 127.56535 0.87889 26634 8201091008 BIAMAAHI MALUKU UTARA 946 Pre-Electrified - - - 127.54830 0.89329 26635 8201091009 AKE JAILOLO MALUKU UTARA 351 Pre-Electrified - - - 127.53471 0.89189 26636 8201091010 SIDANGOLI DEHE MALUKU UTARA 1 746 Pre-Electrified - - - 127.50969 0.89217 26637 8201091011 SIDANGOLI GAM MALUKU UTARA 842 Pre-Electrified - - - 127.49845 0.88756 26638 8201091011 SIDANGOLI GAM MALUKU UTARA 1 621 Pre-Electrified - - - 127.50204 0.88740 26639 8201091012 DOMATO MALUKU UTARA 276 Pre-Electrified - - - 127.52278 0.90220 26640 8201091012 DOMATO MALUKU UTARA 624 Pre-Electrified - - - 127.50926 0.89345 26641 8201091013 GAMLENGE MALUKU UTARA 5 Pre-Electrified - - - 127.51131 0.95115 26642 8201091013 GAMLENGE MALUKU UTARA 251 Pre-Electrified - - - 127.51473 0.95007 26643 8201091014 TATALEKA MALUKU UTARA 420 Pre-Electrified - - - 127.51364 0.95348 26644 8201091014 TATALEKA MALUKU UTARA 189 Pre-Electrified - - - 127.51120 0.95165 26645 8201091016 BRAHA MALUKU UTARA 163 Pre-Electrified - - - 127.63751 0.80947 26646 8201091017 BANGKIT RAHMAT MALUKU UTARA 382 Pre-Electrified - - - 127.63109 0.87517 26647 8201100001 LAKO AKELAMO MALUKU UTARA 307 Pre-Electrified - - - 127.43245 1.14404 26648 8201100002 SUSUPU MALUKU UTARA 19 Pre-Electrified - - - 127.44228 1.15449 26649 8201100002 SUSUPU MALUKU UTARA 939 Pre-Electrified - - - 127.43461 1.15186 26650 8201100002 SUSUPU MALUKU UTARA 93 Pre-Electrified - - - 127.44144 1.15192 26651 8201100003 TACIM MALUKU UTARA 461 Pre-Electrified - - - 127.44712 1.15787 26652 8201100003 TACIM MALUKU UTARA 75 Pre-Electrified - - - 127.44294 1.15496 26653 8201100004 TARUBA MALUKU UTARA 292 Pre-Electrified - - - 127.42500 1.16831 26654 8201100005 BALISOAN MALUKU UTARA 1 115 Pre-Electrified - - - 127.45914 1.15302 26655 8201100006 GOLO MALUKU UTARA 574 Pre-Electrified - - - 127.46336 1.14525 26656 8201100014 TARAUDU MALUKU UTARA 385 Pre-Electrified - - - 127.48181 1.16719 26657 8201100016 TACICI MALUKU UTARA 221 Pre-Electrified - - - 127.47849 1.16621 26658 8201100017 WORAT WORAT MALUKU UTARA 405 Pre-Electrified - - - 127.47685 1.16586 26659 8201100018 TODAHE MALUKU UTARA 893 Pre-Electrified - - - 127.40890 1.18836 Annex II – Demand forecast results Page 196 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 26660 8201100019 PEOT MALUKU UTARA 661 Pre-Electrified - - - 127.40894 1.20950 26661 8201100026 SASUR MALUKU UTARA 1 136 Pre-Electrified - - - 127.42389 1.25817 26662 8201100029 GORO GORO MALUKU UTARA 688 Pre-Electrified - - - 127.42917 1.26885 26663 8201100030 LAKO AKEDIRI MALUKU UTARA 355 Pre-Electrified - - - 127.42506 1.11340 26664 8201100031 JARAKORE MALUKU UTARA 438 Pre-Electrified - - - 127.43213 1.14888 26665 8201100032 ROPU TENGAH BALU MALUKU UTARA 834 Pre-Electrified - - - 127.43189 1.15319 26666 8201101001 IDAM GAMLAMO MALUKU UTARA 522 Pre-Electrified - - - 127.46923 1.13886 26667 8201101002 LOCE MALUKU UTARA 439 Pre-Electrified - - - 127.46788 1.14365 26668 8201101003 GAMOMENG MALUKU UTARA 575 Pre-Electrified - - - 127.47212 1.13436 26669 8201101004 AKELAMO MALUKU UTARA 570 Pre-Electrified - - - 127.47613 1.13141 26670 8201101004 AKELAMO MALUKU UTARA 734 Pre-Electrified - - - 127.47832 1.12819 26671 8201101005 TARAUDU KUSU MALUKU UTARA 2 Pre-Electrified - - - 127.48634 1.13755 26672 8201101005 TARAUDU KUSU MALUKU UTARA 249 Pre-Electrified - - - 127.48256 1.13449 26673 8201101006 AWER MALUKU UTARA 725 Pre-Electrified - - - 127.48998 1.13845 26674 8201101007 AKETOLA MALUKU UTARA 430 Pre-Electrified - - - 127.49181 1.14215 26675 8201101008 TIBOBO MALUKU UTARA 135 Pre-Electrified - - - 127.50000 1.16415 26676 8201101008 TIBOBO MALUKU UTARA 406 Pre-Electrified - - - 127.50002 1.16415 26677 8201101009 HOKU HOKU GAM MALUKU UTARA 172 Pre-Electrified - - - 127.49954 1.16523 26678 8201101009 HOKU HOKU GAM MALUKU UTARA 132 Pre-Electrified - - - 127.50050 1.16480 26679 8201101010 GAMNYIAL MALUKU UTARA 138 Pre-Electrified - - - 127.49966 1.16753 26680 8201101010 GAMNYIAL MALUKU UTARA 236 Pre-Electrified - - - 127.50050 1.16714 26681 8201101011 CAMPAKA MALUKU UTARA 95 Pre-Electrified - - - 127.49961 1.16974 26682 8201101011 CAMPAKA MALUKU UTARA 118 Pre-Electrified - - - 127.50049 1.16970 26683 8201101012 NGAON MALUKU UTARA 117 Pre-Electrified - - - 127.49957 1.17269 26684 8201101012 NGAON MALUKU UTARA 145 Pre-Electrified - - - 127.50053 1.17256 26685 8201101013 GAMSUNGI MALUKU UTARA 169 Pre-Electrified - - - 127.49908 1.17668 26686 8201101013 GAMSUNGI MALUKU UTARA 95 Pre-Electrified - - - 127.50049 1.17649 26687 8201101014 TABA CAMPAKA MALUKU UTARA 47 Pre-Electrified - - - 127.49954 1.17917 26688 8201101014 TABA CAMPAKA MALUKU UTARA 234 Pre-Electrified - - - 127.50586 1.18455 26689 8201101014 TABA CAMPAKA MALUKU UTARA 121 Pre-Electrified - - - 127.50076 1.17977 26690 8201101015 GOAL MALUKU UTARA 514 Pre-Electrified - - - 127.53100 1.20519 26691 8201101016 GOLAGO KUSUMA MALUKU UTARA 1 040 Pre-Electrified - - - 127.53736 1.23061 26692 8201130012 TOGOLA WAYOLI MALUKU UTARA 468 Pre-Electrified - - - 127.54825 1.45643 26693 8201130013 TOGOLA SANGIR MALUKU UTARA 800 Pre-Electrified - - - 127.54580 1.46398 26694 8201130014 TAHAFO MALUKU UTARA 134 Pre-Electrified - - - 127.54386 1.47633 26695 8201130014 TAHAFO MALUKU UTARA 251 Pre-Electrified - - - 127.54383 1.47342 26696 8201130015 KIE ICI MALUKU UTARA 679 Pre-Electrified - - - 127.57292 1.48395 26697 8201130015 KIE ICI MALUKU UTARA 27 Pre-Electrified - - - 127.56962 1.48766 26698 8201130016 MARITANGO MALUKU UTARA 461 Pre-Electrified - - - 127.56844 1.48732 26699 8201130017 TONGUTE GOIN MALUKU UTARA 1 049 Pre-Electrified - - - 127.56005 1.49547 26700 8201130018 AKESIBU MALUKU UTARA 714 Pre-Electrified - - - 127.55372 1.49239 26701 8201130019 TONGUTE SUNGI MALUKU UTARA 1 030 Pre-Electrified - - - 127.55496 1.49839 26702 8201130019 TONGUTE SUNGI MALUKU UTARA 36 Pre-Electrified - - - 127.55423 1.49502 26703 8201130019 TONGUTE SUNGI MALUKU UTARA 22 Pre-Electrified - - - 127.55581 1.50096 26704 8201130020 TONGUTE TERNATE MALUKU UTARA 435 Pre-Electrified - - - 127.54822 1.49668 26705 8201130020 TONGUTE TERNATE MALUKU UTARA 855 Pre-Electrified - - - 127.54189 1.49366 26706 8201130021 TOBAOL MALUKU UTARA 778 Pre-Electrified - - - 127.53736 1.50464 26707 8201130022 GAM ICI MALUKU UTARA 359 Pre-Electrified - - - 127.55228 1.49961 26708 8201130022 GAM ICI MALUKU UTARA 45 Pre-Electrified - - - 127.55433 1.50365 26709 8201130022 GAM ICI MALUKU UTARA 538 Pre-Electrified - - - 127.55406 1.50117 26710 8201130023 GAM LAMO MALUKU UTARA 38 Pre-Electrified - - - 127.55031 1.49982 26711 8201130023 GAM LAMO MALUKU UTARA 639 Pre-Electrified - - - 127.55115 1.50186 26712 8201130037 NAGA MALUKU UTARA 491 Pre-Electrified - - - 127.58197 1.45881 26713 8201131002 TOSOA MALUKU UTARA 1 299 Pre-Electrified - - - 127.54296 1.27427 26714 8201131003 BARU MALUKU UTARA 2 594 Pre-Electrified - - - 127.48737 1.36079 26715 8201131004 ADU MALUKU UTARA 698 Pre-Electrified - - - 127.48997 1.37327 26716 8201131005 NANAS MALUKU UTARA 421 Pre-Electrified - - - 127.49145 1.39117 26717 8201131005 NANAS MALUKU UTARA 39 Pre-Electrified - - - 127.49085 1.38578 26718 8201131006 NGAWET MALUKU UTARA 452 Pre-Electrified - - - 127.49026 1.38313 26719 8201131007 JERE MALUKU UTARA 395 Pre-Electrified - - - 127.49546 1.39794 26720 8201131008 GAMSUNGI MALUKU UTARA 603 Pre-Electrified - - - 127.50855 1.41475 26721 8201131009 BATAKA MALUKU UTARA 274 Pre-Electrified - - - 127.52185 1.42541 26722 8201131009 BATAKA MALUKU UTARA 1 182 Pre-Electrified - - - 127.51695 1.42312 26723 8201131010 TALAGA MALUKU UTARA - Pre-Electrified - - - 127.53026 1.42988 26724 8201131010 TALAGA MALUKU UTARA 734 Pre-Electrified - - - 127.52246 1.42672 26725 8201131011 TOBELOS MALUKU UTARA 421 Pre-Electrified - - - 127.53036 1.43136 26726 8201131012 GAMKONORA MALUKU UTARA 771 Pre-Electrified - - - 127.53381 1.43565 26727 8201131012 GAMKONORA MALUKU UTARA 28 Pre-Electrified - - - 127.53629 1.43458 26728 8201131012 GAMKONORA MALUKU UTARA 33 Pre-Electrified - - - 127.53169 1.43271 26729 8201131013 SARAU MALUKU UTARA 520 Pre-Electrified - - - 127.53752 1.43588 26730 8201132001 PODOL MALUKU UTARA 841 Pre-Electrified - - - 127.56220 1.52406 26731 8201132002 TENGOWANGO MALUKU UTARA 202 Pre-Electrified - - - 127.57471 1.53158 26732 8201132003 TOGOWO MALUKU UTARA 65 Pre-Electrified - - - 127.58627 1.53513 26733 8201132003 TOGOWO MALUKU UTARA 439 Pre-Electrified - - - 127.58448 1.53463 26734 8201132004 DUONO MALUKU UTARA 1 037 Pre-Electrified - - - 127.60173 1.54053 26735 8201132005 GOIN MALUKU UTARA 872 Pre-Electrified - - - 127.62130 1.55192 26736 8201132006 SANGAJI NYEKU MALUKU UTARA 91 Pre-Electrified - - - 127.62532 1.55005 26737 8201132006 SANGAJI NYEKU MALUKU UTARA 11 Pre-Electrified - - - 127.62574 1.54892 26738 8201132006 SANGAJI NYEKU MALUKU UTARA 280 Pre-Electrified - - - 127.62675 1.54741 26739 8201132007 TUGUIS MALUKU UTARA 676 Pre-Electrified - - - 127.63490 1.54788 26740 8201132008 TODOKE MALUKU UTARA 371 Pre-Electrified - - - 127.64573 1.54447 26741 8201132009 TOGOREBA SUNGI MALUKU UTARA 494 Pre-Electrified - - - 127.64263 1.54392 26742 8201132010 BORONA MALUKU UTARA 458 Pre-Electrified - - - 127.64584 1.54304 26743 8201140003 TUGUIS MALUKU UTARA 122 Pre-Electrified - - - 127.55187 1.63371 26744 8201140003 TUGUIS MALUKU UTARA 516 Pre-Electrified - - - 127.55107 1.62940 Annex II – Demand forecast results Page 197 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 26745 8201140004 SOA-SIO MALUKU UTARA 300 Pre-Electrified - - - 127.58325 1.67470 26746 8201140005 KEDI MALUKU UTARA 512 Pre-Electrified - - - 127.58546 1.67421 26747 8201140005 KEDI MALUKU UTARA 265 Pre-Electrified - - - 127.58707 1.67092 26748 8201140005 KEDI MALUKU UTARA 347 Pre-Electrified - - - 127.58754 1.66820 26749 8201140005 KEDI MALUKU UTARA 89 Pre-Electrified - - - 127.58770 1.66247 26750 8201140006 TASYE MALUKU UTARA 52 Pre-Electrified - - - 127.59645 1.66807 26751 8201140006 TASYE MALUKU UTARA 512 Pre-Electrified - - - 127.59643 1.66706 26752 8201140007 LABA BESAR MALUKU UTARA 543 Pre-Electrified - - - 127.60126 1.69456 26753 8201140008 LABA KECIL MALUKU UTARA 512 Pre-Electrified - - - 127.59840 1.70086 26754 8201140009 JANO MALUKU UTARA 141 Pre-Electrified - - - 127.60621 1.70514 26755 8201140010 BAKUN MALUKU UTARA 356 Pre-Electrified - - - 127.59451 1.70400 26756 8201140011 BUO MALUKU UTARA 935 Pre-Electrified - - - 127.56973 1.70585 26757 8201140021 SALU MALUKU UTARA 282 Pre-Electrified - - - 127.58914 1.71114 26758 8201140023 UPT. TRANS JANO MALUKU UTARA 282 Pre-Electrified - - - 127.62648 1.73713 26759 8202030006 NUSLIKO MALUKU UTARA 435 Pre-Electrified - - - 127.87991 0.29989 26760 8202030007 WERE MALUKU UTARA 2 403 Pre-Electrified - - - 127.87636 0.32808 26761 8202030019 NURWEDA MALUKU UTARA 770 Pre-Electrified - - - 127.87432 0.32325 26762 8202030019 NURWEDA MALUKU UTARA 274 Pre-Electrified - - - 127.87340 0.31542 26763 8202030020 FIDI JAYA MALUKU UTARA 1 818 Pre-Electrified - - - 127.87793 0.33125 26764 8202030022 WEDANA MALUKU UTARA 700 Pre-Electrified - - - 127.85847 0.32984 26765 8202031001 KLUTING JAYA MALUKU UTARA 830 Pre-Electrified - - - 127.87750 0.14444 26766 8202031002 WAIRORO INDAH MALUKU UTARA 900 Pre-Electrified - - - 127.88124 0.15925 26767 8202031004 SOSOWOMO MALUKU UTARA 608 Pre-Electrified - - - 127.91340 0.22719 26768 8202031007 LEMBAH ASRI MALUKU UTARA 321 Pre-Electrified - - - 127.88230 0.18706 26769 8202033001 KOBE MALUKU UTARA 432 Pre-Electrified - - - 127.90611 0.40510 26770 8202033002 SAWAI ITEPO MALUKU UTARA 429 Pre-Electrified - - - 127.90011 0.42916 26771 8202033003 LELILEF WAIBULAN MALUKU UTARA 213 Pre-Electrified - - - 127.88945 0.47463 26772 8202033003 LELILEF WAIBULAN MALUKU UTARA 490 Pre-Electrified - - - 127.93489 0.46483 26773 8202033003 LELILEF WAIBULAN MALUKU UTARA 257 MiniGrid Systems 59 60 534 12.2 127.81234 0.62782 26774 8202033004 LELILEF SAWAI MALUKU UTARA 880 Pre-Electrified - - - 127.93558 0.46688 26775 8202033005 WOEKOBE MALUKU UTARA 3 OffGrid Systems 1 1 026 0.2 127.88572 0.54163 26776 8202041001 UMERA MALUKU UTARA 500 MiniGrid Systems 111 113 886 22.9 129.57127 -0.19801 26777 8202041002 SANAFI MALUKU UTARA 453 MiniGrid Systems 106 108 756 21.9 129.46494 -0.08822 26778 8202041003 KACEPI MALUKU UTARA 738 MiniGrid Systems 221 226 746 45.7 129.43595 -0.08071 26779 8202041004 KAPALEO MALUKU UTARA 400 MiniGrid Systems 71 72 846 14.7 129.43419 -0.05769 26780 8202041004 KAPALEO MALUKU UTARA 129 MiniGrid Systems 23 23 598 4.8 129.43080 -0.06666 26781 8202041004 KAPALEO MALUKU UTARA 37 MiniGrid Systems 7 7 182 1.4 129.43200 -0.06935 26782 8202041004 KAPALEO MALUKU UTARA 26 MiniGrid Systems 5 5 130 1.0 129.39749 -0.07019 26783 8202041004 KAPALEO MALUKU UTARA 682 MiniGrid Systems 120 123 120 24.8 129.43083 -0.07427 26784 8202041004 KAPALEO MALUKU UTARA 851 MiniGrid Systems 150 153 900 31.0 129.43835 -0.07703 26785 8202041005 UMIYAL MALUKU UTARA 599 MiniGrid Systems 143 146 718 29.6 129.59938 -0.05672 26786 8202041006 SONOF KACEPO MALUKU UTARA 297 MiniGrid Systems 79 81 054 16.3 129.53183 -0.12151 26787 8202042001 YEISOWO MALUKU UTARA 882 Pre-Electrified - - - 128.77500 0.27765 26788 8202042002 WAILEGI MALUKU UTARA 678 Pre-Electrified - - - 128.76737 0.27835 26789 8202042005 KIPAI MALUKU UTARA 825 Pre-Electrified - - - 128.76299 0.27957 26790 8202042010 YONDELIU MALUKU UTARA 1 023 Pre-Electrified - - - 128.75907 0.28133 26791 8202043001 GEMIA MALUKU UTARA 62 Pre-Electrified - - - 128.75304 0.31739 26792 8202043001 GEMIA MALUKU UTARA 1 788 Pre-Electrified - - - 128.76092 0.31637 26793 8202043002 TEPELEO MALUKU UTARA 971 Pre-Electrified - - - 128.74693 0.31827 26794 8202043002 TEPELEO MALUKU UTARA 463 Pre-Electrified - - - 128.75162 0.31809 26795 8202043006 BILIFITU MALUKU UTARA 859 Pre-Electrified - - - 128.76780 0.31801 26796 8202043007 TEPELEO BATU DUA MALUKU UTARA 1 428 Pre-Electrified - - - 128.74297 0.32049 26797 8202043008 PANTURA JAYA MALUKU UTARA 436 Pre-Electrified - - - 128.72808 0.32586 26798 8202043009 PALLO MALUKU UTARA 163 MiniGrid Systems 55 56 430 11.4 128.67871 0.33571 26799 8203010004 WAI INA MALUKU UTARA 1 156 Pre-Electrified - - - 125.91925 -2.26323 26800 8203010005 KABAU DARAT MALUKU UTARA 84 Pre-Electrified - - - 125.89339 -2.18147 26801 8203010006 ONA MALUKU UTARA 1 089 Pre-Electrified - - - 125.88633 -2.15547 26802 8203010009 NAHI MALUKU UTARA 735 Pre-Electrified - - - 125.86531 -2.10709 26803 8203010010 PARATINA MALUKU UTARA 306 Pre-Electrified - - - 125.85872 -2.08436 26804 8203011001 WAI GAI MALUKU UTARA 1 419 Pre-Electrified - - - 125.97285 -2.40118 26805 8203011002 FUATA MALUKU UTARA 907 Pre-Electrified - - - 125.96066 -2.36108 26806 8203011003 SEKOM MALUKU UTARA 749 Pre-Electrified - - - 125.93538 -2.28996 26807 8203011003 SEKOM MALUKU UTARA 93 Pre-Electrified - - - 125.93255 -2.28755 26808 8203011005 WAI TAMUA MALUKU UTARA 508 Pre-Electrified - - - 125.96048 -2.35748 26809 8203020015 WAILAU MALUKU UTARA 1 128 Pre-Electrified - - - 125.95731 -2.14129 26810 8203020015 WAILAU MALUKU UTARA 837 Pre-Electrified - - - 125.95880 -2.13254 26811 8203020017 PASTINA MALUKU UTARA 579 Pre-Electrified - - - 125.95839 -2.12945 26812 8203020017 PASTINA MALUKU UTARA 281 Pre-Electrified - - - 125.96085 -2.11166 26813 8203020018 UMALOYA MALUKU UTARA 1 127 Pre-Electrified - - - 125.96209 -2.10775 26814 8203020019 WAI IPA MALUKU UTARA 640 Pre-Electrified - - - 125.96583 -2.09390 26815 8203020019 WAI IPA MALUKU UTARA 1 505 Pre-Electrified - - - 125.96827 -2.08879 26816 8203020020 WAI HAMA MALUKU UTARA 1 022 Pre-Electrified - - - 125.97032 -2.08434 26817 8203020020 WAI HAMA MALUKU UTARA 121 Pre-Electrified - - - 125.97111 -2.08233 26818 8203020020 WAI HAMA MALUKU UTARA 119 Pre-Electrified - - - 125.97191 -2.07926 26819 8203020020 WAI HAMA MALUKU UTARA 603 Pre-Electrified - - - 125.97423 -2.07620 26820 8203020021 FOGI MALUKU UTARA 177 Pre-Electrified - - - 125.97615 -2.07395 26821 8203020021 FOGI MALUKU UTARA 56 Pre-Electrified - - - 125.97682 -2.07202 26822 8203020021 FOGI MALUKU UTARA 3 622 Pre-Electrified - - - 125.97953 -2.06964 26823 8203020022 FATCE MALUKU UTARA 3 427 Pre-Electrified - - - 125.98137 -2.06550 26824 8203020023 FALAHU MALUKU UTARA 1 555 Pre-Electrified - - - 125.98135 -2.06135 26825 8203020024 FAGUDU MALUKU UTARA 2 812 Pre-Electrified - - - 125.97946 -2.05815 26826 8203020025 MANGON MALUKU UTARA 4 058 Pre-Electrified - - - 125.98089 -2.05456 26827 8203021001 BEGA MALUKU UTARA 183 Pre-Electrified - - - 126.02271 -2.31544 26828 8203021001 BEGA MALUKU UTARA 77 Pre-Electrified - - - 126.02252 -2.31434 26829 8203021001 BEGA MALUKU UTARA 835 Pre-Electrified - - - 126.02105 -2.31045 Annex II – Demand forecast results Page 198 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 26830 8203021002 FAT-IBA MALUKU UTARA 901 Pre-Electrified - - - 126.00383 -2.26573 26831 8203021002 FAT-IBA MALUKU UTARA 90 Pre-Electrified - - - 126.00044 -2.26165 26832 8203021003 WAIMAN MALUKU UTARA 281 Pre-Electrified - - - 125.97756 -2.21789 26833 8203021003 WAIMAN MALUKU UTARA 437 Pre-Electrified - - - 125.97678 -2.21596 26834 8203021005 WAI BOGA MALUKU UTARA 515 Pre-Electrified - - - 125.96886 -2.19721 26835 8203021005 WAI BOGA MALUKU UTARA 1 719 Pre-Electrified - - - 125.95619 -2.16527 26836 8203021006 MANAF MALUKU UTARA 33 Pre-Electrified - - - 126.03150 -2.33249 26837 8203021006 MANAF MALUKU UTARA 187 Pre-Electrified - - - 126.01890 -2.32399 26838 8203022003 BALEHA MALUKU UTARA 465 Pre-Electrified - - - 126.05952 -2.39741 26839 8203022003 BALEHA MALUKU UTARA 213 Pre-Electrified - - - 126.05884 -2.39197 26840 8203022004 WAI GOYOFA MALUKU UTARA 463 Pre-Electrified - - - 126.04435 -2.36547 26841 8203022005 SAMA MALUKU UTARA 26 Pre-Electrified - - - 126.06587 -2.40942 26842 8203022005 SAMA MALUKU UTARA 163 Pre-Electrified - - - 126.06388 -2.40585 26843 8203022006 WAISEPA MALUKU UTARA 209 Pre-Electrified - - - 126.05224 -2.38159 26844 8203023001 POHEA MALUKU UTARA 862 Pre-Electrified - - - 125.96873 -2.00556 26845 8203023001 POHEA MALUKU UTARA 282 Pre-Electrified - - - 125.95346 -1.98887 26846 8203023002 FUKWEU MALUKU UTARA 82 Pre-Electrified - - - 125.93336 -1.98236 26847 8203023002 FUKWEU MALUKU UTARA 598 Pre-Electrified - - - 125.93295 -1.98024 26848 8203023003 MALBUFA MALUKU UTARA 893 Pre-Electrified - - - 125.87606 -2.02315 26849 8203023004 BAJO MALUKU UTARA 1 392 Pre-Electrified - - - 125.97402 -2.00566 26850 8203023005 MAN GEGA MALUKU UTARA 894 Pre-Electrified - - - 125.99073 -2.03425 26851 8203023006 WAININ MALUKU UTARA 39 Pre-Electrified - - - 125.90159 -1.98623 26852 8203023006 WAININ MALUKU UTARA 10 Pre-Electrified - - - 125.90396 -1.98608 26853 8203023006 WAININ MALUKU UTARA 35 Pre-Electrified - - - 125.90240 -1.98577 26854 8203023006 WAININ MALUKU UTARA 222 Pre-Electrified - - - 125.89963 -1.98567 26855 8203023006 WAININ MALUKU UTARA 38 Pre-Electrified - - - 125.91377 -1.98304 26856 8203023007 FOKALIK MALUKU UTARA 328 Pre-Electrified - - - 125.86545 -2.04492 26857 8203030006 WAITINA MALUKU UTARA 1 850 Pre-Electrified - - - 125.98367 -1.91519 26858 8203030007 KOW MALUKU UTARA 75 Pre-Electrified - - - 126.04691 -1.88891 26859 8203030007 KOW MALUKU UTARA 540 Pre-Electrified - - - 126.06583 -1.88240 26860 8203030008 WAI TAMELA MALUKU UTARA 74 Pre-Electrified - - - 126.11832 -1.88480 26861 8203030008 WAI TAMELA MALUKU UTARA 499 Pre-Electrified - - - 126.11007 -1.88188 26862 8203030009 NAFLOW MALUKU UTARA 174 Pre-Electrified - - - 126.02201 -1.89725 26863 8203030010 KARAMAT TITDOY MALUKU UTARA 421 Pre-Electrified - - - 125.96240 -1.91730 26864 8203031002 CAPALULU MALUKU UTARA 1 366 Pre-Electrified - - - 125.87485 -1.90941 26865 8203031003 ORIFOLA MALUKU UTARA 259 Pre-Electrified - - - 125.89517 -1.92599 26866 8203031003 ORIFOLA MALUKU UTARA 91 Pre-Electrified - - - 125.89011 -1.92240 26867 8203031003 ORIFOLA MALUKU UTARA 26 Pre-Electrified - - - 125.88730 -1.92074 26868 8203031004 WAILOBA MALUKU UTARA 222 MiniGrid Systems 45 46 170 9.3 125.81265 -1.82338 26869 8203031004 WAILOBA MALUKU UTARA 304 MiniGrid Systems 61 62 586 12.6 125.87009 -1.80922 26870 8203031004 WAILOBA MALUKU UTARA 113 MiniGrid Systems 23 23 598 4.8 125.94909 -1.79849 26871 8203031005 MANGOLI MALUKU UTARA 2 065 Pre-Electrified - - - 125.93609 -1.92674 26872 8203031005 MANGOLI MALUKU UTARA 297 Pre-Electrified - - - 125.94743 -1.91984 26873 8203031006 WAITULIA MALUKU UTARA 404 Pre-Electrified - - - 125.90387 -1.93461 26874 8203031007 WAI U MALUKU UTARA 9 Pre-Electrified - - - 125.88650 -1.91997 26875 8203031007 WAI U MALUKU UTARA 276 Pre-Electrified - - - 125.88065 -1.91342 26876 8203032001 KAWATA MALUKU UTARA 277 MiniGrid Systems 47 48 222 9.7 126.20850 -1.81576 26877 8203032003 WAISAKAI MALUKU UTARA 197 MiniGrid Systems 33 33 858 6.8 126.29189 -1.82657 26878 8203032003 WAISAKAI MALUKU UTARA 204 MiniGrid Systems 34 34 884 7.0 126.27621 -1.82190 26879 8203032004 WAISUM MALUKU UTARA 348 MiniGrid Systems 57 58 482 11.8 126.48102 -1.82873 26880 8203040016 JOHOR MALUKU UTARA 40 MiniGrid Systems 8 8 208 1.7 125.36578 -1.86079 26881 8203040016 JOHOR MALUKU UTARA 43 MiniGrid Systems 8 8 208 1.7 125.37227 -1.84573 26882 8203040017 LELYABA MALUKU UTARA 134 MiniGrid Systems 30 30 780 6.2 125.43679 -1.88537 26883 8203041004 MODAPIA MALUKU UTARA 221 MiniGrid Systems 55 56 430 11.4 125.68135 -1.82810 26884 8203041004 MODAPIA MALUKU UTARA 276 MiniGrid Systems 69 70 794 14.3 125.73270 -1.82102 26885 8203050009 TUBANG MALUKU UTARA 80 MiniGrid Systems 21 21 546 4.3 125.07395 -1.78882 26886 8203051006 MANTARARA MALUKU UTARA 276 MiniGrid Systems 61 62 586 12.6 125.08102 -1.88564 26887 8203051008 KAMAYA MALUKU UTARA 179 MiniGrid Systems 41 42 066 8.5 125.23011 -1.87035 26888 8203051009 WAIKOKA MALUKU UTARA 207 MiniGrid Systems 41 42 066 8.5 125.29057 -1.88793 26889 8203051010 WAI KADAI SULA MALUKU UTARA 149 MiniGrid Systems 34 34 884 7.0 125.21137 -1.85438 26890 8203060001 BOBONG MALUKU UTARA 1 800 Pre-Electrified - - - 124.38413 -1.94617 26891 8203060001 BOBONG MALUKU UTARA 18 Pre-Electrified - - - 124.38126 -1.94240 26892 8203060001 BOBONG MALUKU UTARA 9 Pre-Electrified - - - 124.38028 -1.94176 26893 8203060004 KAWALO MALUKU UTARA 76 MiniGrid Systems 18 18 468 3.7 124.56222 -1.95111 26894 8203060021 KARAMAT MALUKU UTARA 1 138 Pre-Electrified - - - 124.34252 -1.89933 26895 8203060022 MARANTI JAYA MALUKU UTARA 275 Pre-Electrified - - - 124.34401 -1.90591 26896 8203060024 HOLBOTA MALUKU UTARA 64 MiniGrid Systems 15 15 390 3.1 124.47815 -2.01981 26897 8203060024 HOLBOTA MALUKU UTARA 146 MiniGrid Systems 34 34 884 7.0 124.46734 -1.95147 26898 8203060024 HOLBOTA MALUKU UTARA 37 MiniGrid Systems 9 9 234 1.9 124.50861 -1.96375 26899 8203060025 UPT KAWALO MALUKU UTARA 35 MiniGrid Systems 11 11 286 2.3 124.45415 -1.95212 26900 8203061012 MBONO MALUKU UTARA 52 MiniGrid Systems 12 12 312 2.5 124.89878 -1.70986 26901 8203061012 MBONO MALUKU UTARA 156 MiniGrid Systems 35 35 910 7.2 124.93301 -1.70543 26902 8203061016 UFUNG MALUKU UTARA 212 MiniGrid Systems 47 48 222 9.7 124.50606 -1.74871 26903 8203062001 NGGELE MALUKU UTARA 2 811 Pre-Electrified - - - 124.36897 -1.76686 26904 8203062002 SALATI MALUKU UTARA 602 Pre-Electrified - - - 124.36886 -1.77882 26905 8203062003 BERINGIN JAYA MALUKU UTARA 351 Pre-Electrified - - - 124.35736 -1.78886 26906 8203062004 KASANGO MALUKU UTARA 315 Pre-Electrified - - - 124.34193 -1.87145 26907 8203063001 TODOLI MALUKU UTARA 1 088 Pre-Electrified - - - 124.46505 -1.66410 26908 8203063002 TOLONG MALUKU UTARA 681 Pre-Electrified - - - 124.43837 -1.66554 26909 8203064002 PENCADO MALUKU UTARA 160 MiniGrid Systems 35 35 910 7.2 124.73936 -1.86523 26910 8203064006 NGGAKI MALUKU UTARA 367 MiniGrid Systems 73 74 898 15.1 124.71577 -1.84123 26911 8204020008 ANGGAI MALUKU UTARA 2 132 Pre-Electrified - - - 127.73533 -1.34842 26912 8204020009 SAMBIKI MALUKU UTARA 1 975 Pre-Electrified - - - 127.71791 -1.34197 26913 8204020011 JIKOTAMO MALUKU UTARA 2 508 Pre-Electrified - - - 127.65456 -1.34285 26914 8204020013 LAIWUI MALUKU UTARA 6 Pre-Electrified - - - 127.64059 -1.34015 Annex II – Demand forecast results Page 199 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 26915 8204020013 LAIWUI MALUKU UTARA 1 907 Pre-Electrified - - - 127.63864 -1.33518 26916 8204020014 BUTON MALUKU UTARA 1 135 Pre-Electrified - - - 127.64221 -1.33960 26917 8204020015 BARU MALUKU UTARA 89 MiniGrid Systems 17 17 442 3.5 127.57809 -1.37383 26918 8204020015 BARU MALUKU UTARA 1 970 Pre-Electrified - - - 127.62800 -1.34537 26919 8204020016 AKEGULA MALUKU UTARA 652 Pre-Electrified - - - 127.63156 -1.33941 26920 8204020022 AIR MANGGA MALUKU UTARA 413 Pre-Electrified - - - 127.74945 -1.35830 26921 8204020022 AIR MANGGA MALUKU UTARA 403 Pre-Electrified - - - 127.75060 -1.35806 26922 8204021003 ALAM KENANGA MALUKU UTARA 159 MiniGrid Systems 35 35 910 7.2 127.33989 -1.43600 26923 8204022002 KELO MALUKU UTARA 478 MiniGrid Systems 99 101 574 20.5 127.96251 -1.47620 26924 8204022003 SUSEPE MALUKU UTARA 158 MiniGrid Systems 42 43 092 8.7 127.98099 -1.49202 26925 8204030034 TOMORI MALUKU UTARA 2 230 Pre-Electrified - - - 127.48739 -0.64064 26926 8204030035 LABUHA MALUKU UTARA 4 903 Pre-Electrified - - - 127.48057 -0.62766 26927 8204030035 LABUHA MALUKU UTARA 282 Pre-Electrified - - - 127.48493 -0.63650 26928 8204030035 LABUHA MALUKU UTARA 341 Pre-Electrified - - - 127.48069 -0.63798 26929 8204030036 AMASING KOTA MALUKU UTARA 3 194 Pre-Electrified - - - 127.47684 -0.62527 26930 8204030037 AMASING KALI MALUKU UTARA 951 Pre-Electrified - - - 127.47559 -0.60141 26931 8204030042 HIDAYAT MALUKU UTARA 237 Pre-Electrified - - - 127.49924 -0.63802 26932 8204030042 HIDAYAT MALUKU UTARA 708 Pre-Electrified - - - 127.50195 -0.63814 26933 8204030043 MARABOSE MALUKU UTARA 643 Pre-Electrified - - - 127.52210 -0.63307 26934 8204030044 AMASING KOTA BARAT MALUKU UTARA 1 591 Pre-Electrified - - - 127.47367 -0.62567 26935 8204030045 AMASING KOTA UTARA MALUKU UTARA 172 Pre-Electrified - - - 127.47876 -0.62278 26936 8204030045 AMASING KOTA UTARA MALUKU UTARA 657 Pre-Electrified - - - 127.47574 -0.62297 26937 8204031006 LELE MALUKU UTARA 727 Pre-Electrified - - - 127.30785 -0.75128 26938 8204031006 LELE MALUKU UTARA 65 Pre-Electrified - - - 127.30624 -0.74985 26939 8204033001 GANDASULI MALUKU UTARA 1 859 Pre-Electrified - - - 127.47793 -0.67961 26940 8204033001 GANDASULI MALUKU UTARA 124 Pre-Electrified - - - 127.47736 -0.67646 26941 8204033002 KUPAL MALUKU UTARA 1 202 Pre-Electrified - - - 127.47814 -0.66940 26942 8204033002 KUPAL MALUKU UTARA 441 Pre-Electrified - - - 127.47701 -0.67200 26943 8204033002 KUPAL MALUKU UTARA 4 Pre-Electrified - - - 127.47712 -0.67574 26944 8204033005 TUAKONA MALUKU UTARA 1 013 Pre-Electrified - - - 127.47563 -0.68066 26945 8204033007 MANDAONG MALUKU UTARA 2 758 Pre-Electrified - - - 127.48040 -0.65252 26946 8204033008 TEMBAL MALUKU UTARA 1 243 Pre-Electrified - - - 127.48124 -0.65517 26947 8204033009 KAMPUNG MAKIAN MALUKU UTARA 2 153 Pre-Electrified - - - 127.49163 -0.65207 26948 8204040014 NYONYIFI MALUKU UTARA 103 MiniGrid Systems 31 31 806 6.4 127.66296 -0.51476 26949 8204040014 NYONYIFI MALUKU UTARA 45 MiniGrid Systems 14 14 364 2.9 127.64727 -0.52652 26950 8204040014 NYONYIFI MALUKU UTARA 22 MiniGrid Systems 7 7 182 1.4 127.63497 -0.53961 26951 8204040018 SALI KECIL MALUKU UTARA 237 MiniGrid Systems 45 46 170 9.3 127.73351 -0.42168 26952 8204040021 WAYAMIGA MALUKU UTARA 1 274 Pre-Electrified - - - 127.55174 -0.62622 26953 8204041003 TABAJAYA MALUKU UTARA 230 Pre-Electrified - - - 127.65712 -0.72249 26954 8204042002 SONGA MALUKU UTARA 944 Pre-Electrified - - - 127.66947 -0.70958 26955 8204042003 BIBINOI MALUKU UTARA 1 702 Pre-Electrified - - - 127.73154 -0.69210 26956 8204051002 MARIKAPAL MALUKU UTARA 179 MiniGrid Systems 40 41 040 8.3 127.12003 -0.47766 26957 8204051010 IMBU IMBU MALUKU UTARA 55 MiniGrid Systems 13 13 338 2.7 127.14677 -0.45851 26958 8204052001 TAWA BACAN BARAT MALUKU UTARA 68 MiniGrid Systems 18 18 468 3.7 127.18266 -0.26233 26959 8204060004 LIGUA MALUKU UTARA 79 MiniGrid Systems 33 33 858 6.8 127.24515 -0.12863 26960 8204060005 KIDA MALUKU UTARA 150 MiniGrid Systems 52 53 352 10.7 127.20105 -0.11543 26961 8204060013 TAWABI MALUKU UTARA 416 Pre-Electrified - - - 127.42054 -0.00637 26962 8204060015 GURUAPIN MALUKU UTARA 2 301 Pre-Electrified - - - 127.40909 0.01323 26963 8204060016 BAJO MALUKU UTARA 1 843 Pre-Electrified - - - 127.41398 0.01292 26964 8204060019 KARAMAT MALUKU UTARA 274 Pre-Electrified - - - 127.41395 0.05417 26965 8204060024 LAIGOMA MALUKU UTARA 229 MiniGrid Systems 52 53 352 10.7 127.21922 0.13352 26966 8204060025 GAFI MALUKU UTARA 231 MiniGrid Systems 60 61 560 12.4 127.15201 0.15652 26967 8204060026 SIKO MALUKU UTARA 395 MiniGrid Systems 102 104 652 21.1 127.12849 0.13219 26968 8204061001 BOKIMIAKE MALUKU UTARA 55 MiniGrid Systems 12 12 312 2.5 127.09486 -0.24327 26969 8204062005 PASIR PUTIH MALUKU UTARA 205 Pre-Electrified - - - 127.41868 -0.01797 26970 8204062005 PASIR PUTIH MALUKU UTARA 77 Pre-Electrified - - - 127.40984 -0.04161 26971 8204062006 ORIMAKURUNGA MALUKU UTARA 1 078 Pre-Electrified - - - 127.41084 -0.06193 26972 8204063005 NGOKOMALAKO MALUKU UTARA 359 Pre-Electrified - - - 127.42418 0.10823 26973 8204063006 WAYASIPANG MALUKU UTARA 226 Pre-Electrified - - - 127.41496 0.08124 26974 8204080015 SAKETA MALUKU UTARA 1 864 Pre-Electrified - - - 127.84633 -0.35631 26975 8204080015 SAKETA MALUKU UTARA 153 MiniGrid Systems 37 37 962 7.6 127.93528 -0.35754 26976 8204080016 CANGO MALUKU UTARA 783 Pre-Electrified - - - 127.81967 -0.33890 26977 8204080017 KOITITI MALUKU UTARA 1 427 Pre-Electrified - - - 127.78280 -0.32718 26978 8204080018 DORO MALUKU UTARA 595 Pre-Electrified - - - 127.76338 -0.32310 26979 8204081003 YAMLY MALUKU UTARA 309 MiniGrid Systems 65 66 690 13.4 128.27268 -0.81922 26980 8204081003 YAMLY MALUKU UTARA 11 OffGrid Systems 3 3 078 0.6 128.26118 -0.86304 26981 8204082001 BOSO MALUKU UTARA 591 Pre-Electrified - - - 127.72726 -0.29973 26982 8204082002 JIKOLAMO MALUKU UTARA 363 Pre-Electrified - - - 127.70404 -0.27587 26983 8204082003 DOLIK MALUKU UTARA 1 506 Pre-Electrified - - - 127.69252 -0.27126 26984 8204082004 SUKA DAMAI MALUKU UTARA 282 Pre-Electrified - - - 127.68128 -0.24263 26985 8204082005 TOKAKA MALUKU UTARA 554 Pre-Electrified - - - 127.66229 -0.21462 26986 8204082006 NURJIHAT MALUKU UTARA 205 Pre-Electrified - - - 127.67060 -0.18413 26987 8204082007 MOLOKU MALUKU UTARA 497 Pre-Electrified - - - 127.68176 -0.15877 26988 8204082008 SAMO MALUKU UTARA 591 Pre-Electrified - - - 127.69468 -0.10649 26989 8204082009 SAMAT MALUKU UTARA 310 Pre-Electrified - - - 127.69702 -0.08651 26990 8204082010 POSI POSI MALUKU UTARA 283 Pre-Electrified - - - 127.69765 -0.06043 26991 8204082011 GUMIRA MALUKU UTARA 430 Pre-Electrified - - - 127.69615 -0.03520 26992 8204082012 BATULAK MALUKU UTARA 438 Pre-Electrified - - - 127.69894 -0.02396 26993 8204090007 SAKETA MALUKU UTARA 488 Pre-Electrified - - - 127.96552 -0.16807 26994 8204090008 AKELAMO MALUKU UTARA 1 046 Pre-Electrified - - - 127.94219 -0.10649 26995 8204090009 BUKIT INDAH MALUKU UTARA 211 MiniGrid Systems 64 65 664 13.2 127.84697 -0.11529 26996 8204090010 RAWA JAYA MALUKU UTARA 58 MiniGrid Systems 19 19 494 3.9 127.81737 -0.11143 26997 8204090011 SUKA MAJU MALUKU UTARA 64 MiniGrid Systems 24 24 624 5.0 127.79094 -0.11340 26998 8204090013 SUMBER MAKMUR MALUKU UTARA 317 MiniGrid Systems 98 100 548 20.3 127.78851 -0.08045 26999 8204090014 LALUBI MALUKU UTARA 270 Pre-Electrified - - - 127.88845 -0.00073 Annex II – Demand forecast results Page 200 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 27000 8204090014 LALUBI MALUKU UTARA 435 Pre-Electrified - - - 127.88830 0.00112 27001 8204090015 MAFFA MALUKU UTARA 845 Pre-Electrified - - - 127.89176 0.04991 27002 8204090016 FOYA MALUKU UTARA 21 Pre-Electrified - - - 127.88873 0.07238 27003 8204090016 FOYA MALUKU UTARA 794 Pre-Electrified - - - 127.88899 0.07059 27004 8204090017 TOBARU MALUKU UTARA 595 Pre-Electrified - - - 127.88624 0.07849 27005 8204090018 FOYA TOBARU MALUKU UTARA 387 Pre-Electrified - - - 127.89099 0.09170 27006 8204090021 KEBUN RAJA MALUKU UTARA 781 Pre-Electrified - - - 127.88896 0.04386 27007 8204090022 KOTA LOOW MALUKU UTARA 29 Pre-Electrified - - - 127.88613 0.07729 27008 8204090022 KOTA LOOW MALUKU UTARA 398 Pre-Electrified - - - 127.88736 0.07431 27009 8204090022 KOTA LOOW MALUKU UTARA 28 Pre-Electrified - - - 127.88704 0.07286 27010 8204090023 TUNGGUL WULUNG MALUKU UTARA 175 MiniGrid Systems 48 49 248 9.9 127.82751 -0.05021 27011 8204091007 MATUTING TANJUNG MALUKU UTARA 9 OffGrid Systems 3 3 078 0.6 127.98478 -0.30628 27012 8205010028 TABOBO MALUKU UTARA 1 344 Pre-Electrified - - - 127.76207 1.09472 27013 8205010029 BALISOSANG MALUKU UTARA 94 MiniGrid Systems 17 17 442 3.5 127.79719 1.10993 27014 8205010033 BUKIT TINGGI MALUKU UTARA 468 Pre-Electrified - - - 127.77470 1.09278 27015 8205010033 BUKIT TINGGI MALUKU UTARA 54 Pre-Electrified - - - 127.77703 1.09137 27016 8205011002 BOBANEIGO MALUKU UTARA 560 Pre-Electrified - - - 127.66476 0.86682 27017 8205011002 BOBANEIGO MALUKU UTARA 171 Pre-Electrified - - - 127.65007 0.86103 27018 8205011002 BOBANEIGO MALUKU UTARA 90 MiniGrid Systems 19 19 494 3.9 127.67601 0.83196 27019 8205011003 TETEWANG MALUKU UTARA 35 Pre-Electrified - - - 127.64274 0.87293 27020 8205011008 TABANOMA MALUKU UTARA 1 OffGrid Systems 1 1 026 0.2 127.65016 1.02020 27021 8205020007 SOASANGAJI DIM DIM MALUKU UTARA - Pre-Electrified - - - 127.87315 1.17458 27022 8205022006 BORI MALUKU UTARA 1 051 Pre-Electrified - - - 127.99218 1.38748 27023 8205022007 PEDIWANG MALUKU UTARA 163 Pre-Electrified - - - 127.99951 1.39665 27024 8205022007 PEDIWANG MALUKU UTARA 1 059 Pre-Electrified - - - 128.00212 1.39697 27025 8205022008 WATETO MALUKU UTARA 711 Pre-Electrified - - - 127.96996 1.42638 27026 8205030008 LELEOTO MALUKU UTARA 874 Pre-Electrified - - - 127.99912 1.59757 27027 8205030008 LELEOTO MALUKU UTARA 38 Pre-Electrified - - - 128.00510 1.59590 27028 8205030008 LELEOTO MALUKU UTARA 610 Pre-Electrified - - - 128.00123 1.59597 27029 8205030009 PACA MALUKU UTARA 1 827 Pre-Electrified - - - 127.99513 1.60331 27030 8205030010 TOBE MALUKU UTARA 9 Pre-Electrified - - - 127.97298 1.60800 27031 8205030010 TOBE MALUKU UTARA 536 Pre-Electrified - - - 127.97296 1.60620 27032 8205030010 TOBE MALUKU UTARA 31 Pre-Electrified - - - 127.97216 1.60304 27033 8205030011 KUPA KUPA MALUKU UTARA 140 Pre-Electrified - - - 127.98395 1.63248 27034 8205030011 KUPA KUPA MALUKU UTARA 973 Pre-Electrified - - - 127.98092 1.62888 27035 8205030011 KUPA KUPA MALUKU UTARA - Pre-Electrified - - - 127.98529 1.62715 27036 8205030011 KUPA KUPA MALUKU UTARA - Pre-Electrified - - - 127.98715 1.62618 27037 8205030012 TOMA HALU MALUKU UTARA 1 248 Pre-Electrified - - - 127.99393 1.63893 27038 8205030013 EFI EFI MALUKU UTARA 1 013 Pre-Electrified - - - 127.99398 1.64787 27039 8205030014 GAMHOKU MALUKU UTARA 986 Pre-Electrified - - - 127.99060 1.66208 27040 8205030016 LEMAH INO MALUKU UTARA 294 Pre-Electrified - - - 127.97427 1.61144 27041 8205030016 LEMAH INO MALUKU UTARA 241 Pre-Electrified - - - 127.97304 1.60891 27042 8205030017 KUPA KUPA SELATAN MALUKU UTARA 924 Pre-Electrified - - - 127.98120 1.62705 27043 8205030017 KUPA KUPA SELATAN MALUKU UTARA 88 Pre-Electrified - - - 127.98538 1.62692 27044 8205030017 KUPA KUPA SELATAN MALUKU UTARA 54 Pre-Electrified - - - 127.98732 1.62575 27045 8205030018 KAKARA B MALUKU UTARA 457 Pre-Electrified - - - 127.99128 1.63657 27046 8205030018 KAKARA B MALUKU UTARA 88 Pre-Electrified - - - 127.99279 1.63547 27047 8205030019 TIOUA MALUKU UTARA 147 Pre-Electrified - - - 127.99191 1.65699 27048 8205030019 TIOUA MALUKU UTARA 838 Pre-Electrified - - - 127.99270 1.65190 27049 8205030020 PALE MALUKU UTARA 1 164 Pre-Electrified - - - 127.99179 1.66680 27050 8205031001 KUSURI MALUKU UTARA 1 839 Pre-Electrified - - - 127.91747 1.48369 27051 8205031003 TOGOLIUA MALUKU UTARA 578 Pre-Electrified - - - 127.94946 1.54306 27052 8205031003 TOGOLIUA MALUKU UTARA 90 Pre-Electrified - - - 127.95073 1.53947 27053 8205031003 TOGOLIUA MALUKU UTARA 120 Pre-Electrified - - - 127.95233 1.53808 27054 8205032004 MAWEA MALUKU UTARA 1 110 Pre-Electrified - - - 128.03310 1.57425 27055 8205032005 TODOKUIHA MALUKU UTARA 777 Pre-Electrified - - - 128.03515 1.56814 27056 8205032005 TODOKUIHA MALUKU UTARA 187 Pre-Electrified - - - 128.03327 1.56707 27057 8205032006 YARO MALUKU UTARA 1 026 Pre-Electrified - - - 128.00467 1.59391 27058 8205040018 GAMSUNGI MALUKU UTARA 7 001 Pre-Electrified - - - 128.00669 1.72713 27059 8205040020 GURA MALUKU UTARA 5 Pre-Electrified - - - 128.00335 1.74044 27060 8205040020 GURA MALUKU UTARA 3 792 Pre-Electrified - - - 128.00711 1.73371 27061 8205040022 WARI MALUKU UTARA 1 249 Pre-Electrified - - - 127.99460 1.74773 27062 8205040022 WARI MALUKU UTARA 67 Pre-Electrified - - - 127.99713 1.74270 27063 8205040022 WARI MALUKU UTARA 69 Pre-Electrified - - - 127.99401 1.73949 27064 8205040022 WARI MALUKU UTARA 122 Pre-Electrified - - - 127.99648 1.75050 27065 8205040022 WARI MALUKU UTARA 883 Pre-Electrified - - - 128.00225 1.74175 27066 8205040023 MKCM MALUKU UTARA 39 Pre-Electrified - - - 127.99387 1.73920 27067 8205040023 MKCM MALUKU UTARA 1 032 Pre-Electrified - - - 127.99649 1.73645 27068 8205040023 MKCM MALUKU UTARA 79 Pre-Electrified - - - 127.99894 1.73684 27069 8205040023 MKCM MALUKU UTARA 3 Pre-Electrified - - - 128.00247 1.74032 27070 8205040023 MKCM MALUKU UTARA 974 Pre-Electrified - - - 128.00296 1.73031 27071 8205040024 RAWAJAYA MALUKU UTARA 4 511 Pre-Electrified - - - 128.01169 1.72070 27072 8205040025 GOSOMA MALUKU UTARA 5 983 Pre-Electrified - - - 128.00733 1.72187 27073 8205040025 GOSOMA MALUKU UTARA 231 Pre-Electrified - - - 128.00273 1.71755 27074 8205040025 GOSOMA MALUKU UTARA 3 Pre-Electrified - - - 128.00983 1.71199 27075 8205040026 WARI INO MALUKU UTARA 174 Pre-Electrified - - - 127.99204 1.74882 27076 8205040026 WARI INO MALUKU UTARA 259 Pre-Electrified - - - 127.98896 1.75635 27077 8205040026 WARI INO MALUKU UTARA 945 Pre-Electrified - - - 127.99468 1.75132 27078 8205041001 KALIUPA MALUKU UTARA 30 Pre-Electrified - - - 127.99976 1.67405 27079 8205041001 KALIUPA MALUKU UTARA 74 Pre-Electrified - - - 127.99656 1.67358 27080 8205041001 KALIUPA MALUKU UTARA 480 Pre-Electrified - - - 128.00238 1.67361 27081 8205041002 UPA MALUKU UTARA 76 Pre-Electrified - - - 128.00671 1.68177 27082 8205041002 UPA MALUKU UTARA 70 Pre-Electrified - - - 128.00514 1.67937 27083 8205041002 UPA MALUKU UTARA 426 Pre-Electrified - - - 128.00382 1.67579 27084 8205041003 PITU MALUKU UTARA 948 Pre-Electrified - - - 128.01192 1.68689 Annex II – Demand forecast results Page 201 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 27085 8205041003 PITU MALUKU UTARA 107 Pre-Electrified - - - 128.00794 1.68282 27086 8205041004 LINA INO MALUKU UTARA 217 Pre-Electrified - - - 128.00547 1.69515 27087 8205041004 LINA INO MALUKU UTARA 270 Pre-Electrified - - - 128.00774 1.69398 27088 8205041004 LINA INO MALUKU UTARA 447 Pre-Electrified - - - 128.00827 1.69145 27089 8205041004 LINA INO MALUKU UTARA 966 Pre-Electrified - - - 128.01181 1.69025 27090 8205041006 WKO MALUKU UTARA 7 Pre-Electrified - - - 128.00715 1.71080 27091 8205041006 WKO MALUKU UTARA 349 Pre-Electrified - - - 128.00672 1.70909 27092 8205041006 WKO MALUKU UTARA 1 153 Pre-Electrified - - - 128.00440 1.70556 27093 8205041007 MAHIA MALUKU UTARA 1 990 Pre-Electrified - - - 128.01407 1.70439 27094 8205041007 MAHIA MALUKU UTARA 53 Pre-Electrified - - - 128.01961 1.70820 27095 8205041008 WOSIA MALUKU UTARA 167 Pre-Electrified - - - 128.01061 1.71446 27096 8205041008 WOSIA MALUKU UTARA 174 Pre-Electrified - - - 128.01647 1.71305 27097 8205041008 WOSIA MALUKU UTARA 2 877 Pre-Electrified - - - 128.01080 1.71004 27098 8205041008 WOSIA MALUKU UTARA 36 Pre-Electrified - - - 128.01794 1.71068 27099 8205041008 WOSIA MALUKU UTARA 17 Pre-Electrified - - - 128.01886 1.70935 27100 8205041009 TANJUNG NIARA MALUKU UTARA 1 084 Pre-Electrified - - - 128.01508 1.69950 27101 8205042001 GORUA SELATAN MALUKU UTARA 1 289 Pre-Electrified - - - 127.98498 1.76253 27102 8205042001 GORUA SELATAN MALUKU UTARA 7 Pre-Electrified - - - 127.98873 1.75699 27103 8205042002 GORUA MALUKU UTARA 1 283 Pre-Electrified - - - 127.98076 1.76377 27104 8205042003 GORUA UTARA MALUKU UTARA 889 Pre-Electrified - - - 127.97874 1.76381 27105 8205042004 POPILO MALUKU UTARA 1 577 Pre-Electrified - - - 127.97162 1.76773 27106 8205042005 POPILO UTARA MALUKU UTARA 454 Pre-Electrified - - - 127.96705 1.77028 27107 8205042006 KOKOTA JAYA MALUKU UTARA 829 Pre-Electrified - - - 127.95133 1.77244 27108 8205042007 RUKO MALUKU UTARA 765 Pre-Electrified - - - 127.95030 1.77621 27109 8205042008 LUARI MALUKU UTARA 1 221 Pre-Electrified - - - 127.92684 1.80553 27110 8205050005 MAMUYA MALUKU UTARA 2 115 Pre-Electrified - - - 127.89985 1.79799 27111 8205050006 PUNE MALUKU UTARA 570 Pre-Electrified - - - 127.84514 1.81790 27112 8205050006 PUNE MALUKU UTARA 73 Pre-Electrified - - - 127.84831 1.81919 27113 8205050007 SOA SIO MALUKU UTARA 1 591 Pre-Electrified - - - 127.84298 1.82261 27114 8205050009 BARATAKU MALUKU UTARA 950 Pre-Electrified - - - 127.84269 1.83167 27115 8205050010 TOWARA MALUKU UTARA 703 Pre-Electrified - - - 127.84165 1.82381 27116 8205051001 BALE MALUKU UTARA 395 Pre-Electrified - - - 127.79482 1.82116 27117 8205051002 ORI MALUKU UTARA 665 Pre-Electrified - - - 127.79872 1.81802 27118 8205051003 IGOBULA MALUKU UTARA 7 Pre-Electrified - - - 127.79939 1.81689 27119 8205051003 IGOBULA MALUKU UTARA 1 852 Pre-Electrified - - - 127.80638 1.81312 27120 8205051004 SOAKONORA MALUKU UTARA 1 973 Pre-Electrified - - - 127.80881 1.80809 27121 8205051005 TOGAWA MALUKU UTARA 1 099 Pre-Electrified - - - 127.81708 1.80898 27122 8205051006 TOGAWA BESI MALUKU UTARA 776 Pre-Electrified - - - 127.82262 1.81235 27123 8205051007 SEKI MALUKU UTARA 688 Pre-Electrified - - - 127.82786 1.81737 27124 8205052001 SAMUDA MALUKU UTARA 899 Pre-Electrified - - - 127.78872 1.82218 27125 8205052002 SOATOBARU MALUKU UTARA 1 184 Pre-Electrified - - - 127.78984 1.82411 27126 8205052004 DOKULAMO MALUKU UTARA 1 640 Pre-Electrified - - - 127.79261 1.82691 27127 8205052005 KIRA MALUKU UTARA 747 Pre-Electrified - - - 127.79674 1.82810 27128 8205052006 DUMA MALUKU UTARA 1 380 Pre-Electrified - - - 127.80067 1.82779 27129 8205052007 GOTALAMO MALUKU UTARA 673 Pre-Electrified - - - 127.80520 1.83245 27130 8205052008 MAKETE MALUKU UTARA 321 Pre-Electrified - - - 127.80631 1.83629 27131 8205052009 NGIDIHO MALUKU UTARA 1 471 Pre-Electrified - - - 127.80500 1.84594 27132 8205053001 LIMAU MALUKU UTARA 638 Pre-Electrified - - - 127.85345 1.92760 27133 8205053002 LALONGA MALUKU UTARA 588 Pre-Electrified - - - 127.87585 1.94254 27134 8205053003 BOBI SINGO MALUKU UTARA 729 Pre-Electrified - - - 127.89325 1.95500 27135 8205053004 DODOWO MALUKU UTARA 546 Pre-Electrified - - - 127.93368 1.98187 27136 8205053005 SALIMULI MALUKU UTARA 967 Pre-Electrified - - - 127.95032 1.99240 27137 8205053006 TUTUMALOLEO MALUKU UTARA 605 Pre-Electrified - - - 127.95094 2.01507 27138 8205053007 TOGASA MALUKU UTARA 605 Pre-Electrified - - - 127.95303 2.03883 27139 8205053008 SALUTA MALUKU UTARA 977 Pre-Electrified - - - 127.96930 2.06404 27140 8205060014 WORIMOI MALUKU UTARA 1 OffGrid Systems 1 1 026 0.2 127.83799 2.08356 27141 8206010001 BICOLI MALUKU UTARA 2 556 Pre-Electrified - - - 128.51538 0.58989 27142 8206010002 WACI MALUKU UTARA 1 014 Pre-Electrified - - - 128.47691 0.59777 27143 8206010003 PETELEY MALUKU UTARA 673 Pre-Electrified - - - 128.47353 0.59948 27144 8206010004 LOLEOLAMO MALUKU UTARA 478 Pre-Electrified - - - 128.43660 0.63028 27145 8206010005 GOTOWASI MALUKU UTARA 1 146 Pre-Electrified - - - 128.42571 0.63157 27146 8206010006 KASUBA MALUKU UTARA 2 815 Pre-Electrified - - - 128.51165 0.59147 27147 8206011004 SOA SANGAJI MALUKU UTARA 1 113 Pre-Electrified - - - 128.24178 0.82326 27148 8206011005 SOA LAIPOH MALUKU UTARA 573 Pre-Electrified - - - 128.24128 0.82475 27149 8206020001 NUSA AMBU MALUKU UTARA 743 Pre-Electrified - - - 127.69949 0.87547 27150 8206020001 NUSA AMBU MALUKU UTARA 464 Pre-Electrified - - - 127.69686 0.86534 27151 8206020002 PINTATU MALUKU UTARA 399 Pre-Electrified - - - 127.74755 0.81272 27152 8206020002 PINTATU MALUKU UTARA 360 Pre-Electrified - - - 127.75181 0.81066 27153 8206020003 BINAGARA MALUKU UTARA 486 Pre-Electrified - - - 127.83086 0.77295 27154 8206020003 BINAGARA MALUKU UTARA 44 Pre-Electrified - - - 127.81707 0.77051 27155 8206020003 BINAGARA MALUKU UTARA 61 Pre-Electrified - - - 127.81865 0.76788 27156 8206020003 BINAGARA MALUKU UTARA 37 Pre-Electrified - - - 127.81657 0.76661 27157 8206020003 BINAGARA MALUKU UTARA 22 Pre-Electrified - - - 127.81622 0.76471 27158 8206020003 BINAGARA MALUKU UTARA 53 Pre-Electrified - - - 127.81420 0.76317 27159 8206020003 BINAGARA MALUKU UTARA 23 Pre-Electrified - - - 127.80938 0.75725 27160 8206020003 BINAGARA MALUKU UTARA 19 Pre-Electrified - - - 127.80794 0.75591 27161 8206020003 BINAGARA MALUKU UTARA 1 OffGrid Systems 1 1 026 0.2 127.80428 0.75009 27162 8206020004 NUSA JAYA MALUKU UTARA 669 Pre-Electrified - - - 127.84082 0.80400 27163 8206020004 NUSA JAYA MALUKU UTARA 594 Pre-Electrified - - - 127.83644 0.80260 27164 8206020004 NUSA JAYA MALUKU UTARA 253 Pre-Electrified - - - 127.84282 0.80050 27165 8206020005 MINAMIN MALUKU UTARA 686 Pre-Electrified - - - 127.86320 0.81763 27166 8206020006 WAIJOI MALUKU UTARA 1 826 Pre-Electrified - - - 127.93246 0.87917 27167 8206020007 SARAMAAKE MALUKU UTARA 55 Pre-Electrified - - - 127.97378 1.05584 27168 8206020007 SARAMAAKE MALUKU UTARA 454 Pre-Electrified - - - 127.97010 1.05215 27169 8206020008 WASILE MALUKU UTARA 654 Pre-Electrified - - - 127.98002 1.06926 Annex II – Demand forecast results Page 202 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 27170 8206020009 FAYAUL MALUKU UTARA 715 Pre-Electrified - - - 128.00852 1.09824 27171 8206020010 TOMARES MALUKU UTARA 514 Pre-Electrified - - - 127.76939 0.78771 27172 8206020011 TABANALOU MALUKU UTARA 374 Pre-Electrified - - - 127.77720 0.77775 27173 8206020012 SAOLAT MALUKU UTARA 528 Pre-Electrified - - - 127.90592 0.85334 27174 8206020013 LOLEBA MALUKU UTARA 301 Pre-Electrified - - - 127.93744 0.98230 27175 8206020013 LOLEBA MALUKU UTARA 865 Pre-Electrified - - - 127.93557 0.97173 27176 8206020014 NANAS MALUKU UTARA 350 Pre-Electrified - - - 128.04506 1.11355 27177 8206030010 SUBAIM MALUKU UTARA 922 Pre-Electrified - - - 128.13785 1.12065 27178 8206030010 SUBAIM MALUKU UTARA 800 Pre-Electrified - - - 128.12934 1.11480 27179 8206030011 CEMARA JAYA MALUKU UTARA 7 Pre-Electrified - - - 128.13505 1.08610 27180 8206030011 CEMARA JAYA MALUKU UTARA 11 Pre-Electrified - - - 128.13182 1.08450 27181 8206030011 CEMARA JAYA MALUKU UTARA 1 393 Pre-Electrified - - - 128.12877 1.09145 27182 8206030012 BUMI RESTU MALUKU UTARA 2 060 Pre-Electrified - - - 128.16843 1.08521 27183 8206030013 BATU RAJA MALUKU UTARA 1 066 Pre-Electrified - - - 128.14202 1.07953 27184 8206030013 BATU RAJA MALUKU UTARA 63 Pre-Electrified - - - 128.13191 1.08333 27185 8206030013 BATU RAJA MALUKU UTARA 523 Pre-Electrified - - - 128.15823 1.08221 27186 8206030014 MEKAR SARI MALUKU UTARA 1 405 Pre-Electrified - - - 128.18729 1.09165 27187 8206030014 MEKAR SARI MALUKU UTARA 17 MiniGrid Systems 5 5 130 1.0 128.22984 1.10075 27188 8206030014 MEKAR SARI MALUKU UTARA 10 Pre-Electrified - - - 128.17008 1.09392 27189 8206030014 MEKAR SARI MALUKU UTARA 22 MiniGrid Systems 6 6 156 1.2 128.25288 1.06648 27190 8206030015 GULAPAPO MALUKU UTARA 412 Pre-Electrified - - - 128.17006 1.10295 27191 8206030015 GULAPAPO MALUKU UTARA 1 Pre-Electrified - - - 128.18810 1.10420 27192 8206031001 DAKA INO MALUKU UTARA 1 225 Pre-Electrified - - - 128.18939 1.09867 27193 8206031001 DAKA INO MALUKU UTARA 607 Pre-Electrified - - - 128.19731 1.10092 27194 8206031002 AKE DAGA MALUKU UTARA 2 206 Pre-Electrified - - - 128.20735 1.12114 27195 8206031003 TOBOINO MALUKU UTARA 49 MiniGrid Systems 13 13 338 2.7 128.23362 1.13955 27196 8206031004 DODAGA MALUKU UTARA 1 475 Pre-Electrified - - - 128.19087 1.14666 27197 8206031005 TUTULING JAYA MALUKU UTARA 1 114 Pre-Electrified - - - 128.22203 1.19498 27198 8206031006 WOKA JAYA MALUKU UTARA 304 Pre-Electrified - - - 128.21817 1.18106 27199 8206031006 WOKA JAYA MALUKU UTARA 528 Pre-Electrified - - - 128.21920 1.17413 27200 8206032001 LOLOBATA MALUKU UTARA 26 Pre-Electrified - - - 128.11654 1.24939 27201 8206032001 LOLOBATA MALUKU UTARA 782 Pre-Electrified - - - 128.11735 1.24849 27202 8206032002 HATETABAKO MALUKU UTARA 764 Pre-Electrified - - - 128.08731 1.25853 27203 8206032003 PUAO MALUKU UTARA 655 Pre-Electrified - - - 128.11804 1.28812 27204 8206032004 KAKARAINO MALUKU UTARA 425 Pre-Electrified - - - 128.12208 1.29290 27205 8206032005 FOLI MALUKU UTARA 306 Pre-Electrified - - - 128.16378 1.24937 27206 8206032005 FOLI MALUKU UTARA 9 Pre-Electrified - - - 128.16108 1.24982 27207 8206032005 FOLI MALUKU UTARA 419 Pre-Electrified - - - 128.15928 1.25210 27208 8206032005 FOLI MALUKU UTARA 153 Pre-Electrified - - - 128.16204 1.25041 27209 8206032006 NYAOLAKO MALUKU UTARA 271 Pre-Electrified - - - 128.09414 1.27938 27210 8206032007 BOKIMAAKE MALUKU UTARA 108 Pre-Electrified - - - 128.11546 1.24944 27211 8206032007 BOKIMAAKE MALUKU UTARA - Pre-Electrified - - - 128.11547 1.24839 27212 8206032007 BOKIMAAKE MALUKU UTARA 275 Pre-Electrified - - - 128.11272 1.25241 27213 8206032007 BOKIMAAKE MALUKU UTARA 203 Pre-Electrified - - - 128.11602 1.25074 27214 8206032008 SILALAYANG MALUKU UTARA 511 Pre-Electrified - - - 128.11398 1.28117 27215 8206040010 BULI ASAL MALUKU UTARA 681 Pre-Electrified - - - 128.28452 0.87312 27216 8206040011 BULI KARYA MALUKU UTARA 1 928 Pre-Electrified - - - 128.28684 0.87680 27217 8206040012 BULI MALUKU UTARA 2 284 Pre-Electrified - - - 128.29509 0.88301 27218 8206040013 WAYAFLI MALUKU UTARA 643 Pre-Electrified - - - 128.28263 0.87398 27219 8206040014 SAILAL MALUKU UTARA 1 096 Pre-Electrified - - - 128.29207 0.87996 27220 8206040015 GELTOLI MALUKU UTARA 283 Pre-Electrified - - - 128.31004 0.92033 27221 8206040015 GELTOLI MALUKU UTARA 1 351 Pre-Electrified - - - 128.29727 0.88904 27222 8206040016 PEKAULANG MALUKU UTARA 75 Pre-Electrified - - - 128.35879 0.91989 27223 8206040016 PEKAULANG MALUKU UTARA 245 Pre-Electrified - - - 128.37211 0.91703 27224 8206041003 UPT DOROSAGO SP V MALUKU UTARA 21 MiniGrid Systems 7 7 182 1.4 128.48967 1.02088 27225 8206041005 UPT DOROSAGO SP III MALUKU UTARA 113 MiniGrid Systems 28 28 728 5.8 128.42523 1.07365 27226 8206041008 DOROLAMO JAYA MALUKU UTARA 5 OffGrid Systems 2 2 052 0.4 128.64725 1.05492 27227 8206041009 BANGUL MALUKU UTARA 310 MiniGrid Systems 70 71 820 14.5 128.39212 1.01827 27228 8207010001 JUANGA MALUKU UTARA 534 Pre-Electrified - - - 128.28031 2.01088 27229 8207010002 PANDANGA MALUKU UTARA 730 Pre-Electrified - - - 128.28976 2.02698 27230 8207010003 DARUBA MALUKU UTARA 2 306 Pre-Electrified - - - 128.29493 2.05514 27231 8207010004 YAYASAN MALUKU UTARA 1 021 Pre-Electrified - - - 128.29236 2.04885 27232 8207010007 PILOWO MALUKU UTARA 494 Pre-Electrified - - - 128.25394 2.10573 27233 8207010008 DARAME MALUKU UTARA 1 122 Pre-Electrified - - - 128.29659 2.04882 27234 8207010009 GOTALAMO MALUKU UTARA 1 704 Pre-Electrified - - - 128.29787 2.05202 27235 8207010010 MUHAJIRIN MALUKU UTARA 703 Pre-Electrified - - - 128.29389 2.05159 27236 8207010011 WAWAMA MALUKU UTARA 1 145 Pre-Electrified - - - 128.30268 2.03641 27237 8207010012 TOTODOKU MALUKU UTARA - Pre-Electrified - - - 128.36122 2.04541 27238 8207010012 TOTODOKU MALUKU UTARA 617 Pre-Electrified - - - 128.36280 2.04536 27239 8207010013 JOUBELA MALUKU UTARA 726 Pre-Electrified - - - 128.35914 2.04449 27240 8207010014 MANDIRI MALUKU UTARA 311 Pre-Electrified - - - 128.36857 2.04656 27241 8207010015 DEHEGILA MALUKU UTARA 1 382 Pre-Electrified - - - 128.30990 2.10108 27242 8207010016 AHA MALUKU UTARA 221 Pre-Electrified - - - 128.28069 2.12587 27243 8207010017 MOMOJIU MALUKU UTARA 301 Pre-Electrified - - - 128.37861 2.05242 27244 8207010018 SABATAI BARU MALUKU UTARA 9 Pre-Electrified - - - 128.40125 2.05854 27245 8207010018 SABATAI BARU MALUKU UTARA 589 Pre-Electrified - - - 128.39907 2.05752 27246 8207010018 SABATAI BARU MALUKU UTARA 14 Pre-Electrified - - - 128.40216 2.05876 27247 8207010018 SABATAI BARU MALUKU UTARA 15 Pre-Electrified - - - 128.40163 2.05889 27248 8207010019 SABATAI TUA MALUKU UTARA 899 Pre-Electrified - - - 128.41899 2.05904 27249 8207010020 DAEO MALUKU UTARA 1 273 Pre-Electrified - - - 128.47590 2.05663 27250 8207010020 DAEO MALUKU UTARA 452 Pre-Electrified - - - 128.44897 2.06071 27251 8207020001 SAMBIKI MALUKU UTARA 839 Pre-Electrified - - - 128.54403 2.10112 27252 8207020002 SAMBIKI BARU MALUKU UTARA 751 Pre-Electrified - - - 128.54177 2.09283 27253 8207020003 SANGOWO MALUKU UTARA 2 161 Pre-Electrified - - - 128.55407 2.10602 27254 8207020004 MIRA MALUKU UTARA 1 220 Pre-Electrified - - - 128.58479 2.15840 Annex II – Demand forecast results Page 203 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 27255 8207020005 RAHMAT MALUKU UTARA 285 Pre-Electrified - - - 128.58444 2.15407 27256 8207020005 RAHMAT MALUKU UTARA - Pre-Electrified - - - 128.58425 2.15545 27257 8207020006 WEWEMO MALUKU UTARA 741 Pre-Electrified - - - 128.59332 2.17659 27258 8207020007 BUHO BUHO MALUKU UTARA 1 617 Pre-Electrified - - - 128.60843 2.19798 27259 8207020008 LIFAO MALUKU UTARA 112 Pre-Electrified - - - 128.61622 2.22714 27260 8207030001 WARINGIN MALUKU UTARA 511 Pre-Electrified - - - 128.24814 2.12745 27261 8207030002 ARU IRIAN MALUKU UTARA 237 Pre-Electrified - - - 128.24793 2.15000 27262 8207030003 COCOMARE MALUKU UTARA 332 Pre-Electrified - - - 128.25393 2.17598 27263 8207030004 NGELE NGELE KECIL MALUKU UTARA 306 Pre-Electrified - - - 128.27307 2.19672 27264 8207030005 USBAR PANTAI MALUKU UTARA 170 Pre-Electrified - - - 128.24929 2.19266 27265 8207030005 USBAR PANTAI MALUKU UTARA 54 Pre-Electrified - - - 128.25041 2.19450 27266 8207030007 RAJA MALUKU UTARA 82 Pre-Electrified - - - 128.24980 2.23933 27267 8207030007 RAJA MALUKU UTARA 435 Pre-Electrified - - - 128.25171 2.23870 27268 8207030007 RAJA MALUKU UTARA 73 Pre-Electrified - - - 128.25063 2.24113 27269 8207030008 TILEY MALUKU UTARA 201 Pre-Electrified - - - 128.24910 2.19950 27270 8207030008 TILEY MALUKU UTARA 524 Pre-Electrified - - - 128.24276 2.20684 27271 8207030008 TILEY MALUKU UTARA 238 Pre-Electrified - - - 128.25075 2.19685 27272 8207030009 WAYABULA MALUKU UTARA 1 162 Pre-Electrified - - - 128.20233 2.27889 27273 8207050001 BIDO MALUKU UTARA 819 Pre-Electrified - - - 128.64103 2.28038 27274 8207050003 TAWAKALI MALUKU UTARA 548 Pre-Electrified - - - 128.64474 2.34807 27275 8207050004 SAKITA MALUKU UTARA 1 267 Pre-Electrified - - - 128.66043 2.37801 27276 8207050005 LELEO JAYA MALUKU UTARA 775 Pre-Electrified - - - 128.65568 2.37629 27277 8207050005 LELEO JAYA MALUKU UTARA - Pre-Electrified - - - 128.65748 2.37705 27278 8207050006 KENARI MALUKU UTARA 49 MiniGrid Systems 12 12 312 2.5 128.66476 2.37974 27279 8207050006 KENARI MALUKU UTARA 718 Pre-Electrified - - - 128.66361 2.38712 27280 8207050007 BERE BERE MALUKU UTARA 1 272 Pre-Electrified - - - 128.66369 2.39481 27281 8207050009 KORAGO MALUKU UTARA 700 Pre-Electrified - - - 128.65418 2.52386 27282 8207050010 GORUA MALUKU UTARA 1 015 Pre-Electrified - - - 128.69113 2.42493 27283 8271010005 JAMBULA MALUKU UTARA 2 050 Pre-Electrified - - - 127.31997 0.75695 27284 8271010005 JAMBULA MALUKU UTARA 292 Pre-Electrified - - - 127.32244 0.75974 27285 8271010006 KASTELA MALUKU UTARA 2 Pre-Electrified - - - 127.30448 0.77057 27286 8271010006 KASTELA MALUKU UTARA 898 Pre-Electrified - - - 127.31050 0.76280 27287 8271010008 KULABA MALUKU UTARA 1 623 Pre-Electrified - - - 127.36203 0.84586 27288 8271010009 RUA MALUKU UTARA 745 Pre-Electrified - - - 127.30245 0.77573 27289 8271010009 RUA MALUKU UTARA 708 Pre-Electrified - - - 127.30372 0.77212 27290 8271010010 BULA MALUKU UTARA 814 Pre-Electrified - - - 127.35543 0.85087 27291 8271010011 AFE-TADUMA MALUKU UTARA 355 Pre-Electrified - - - 127.29525 0.80176 27292 8271010011 AFE-TADUMA MALUKU UTARA 433 Pre-Electrified - - - 127.29389 0.79826 27293 8271010011 AFE-TADUMA MALUKU UTARA 194 Pre-Electrified - - - 127.29519 0.79686 27294 8271010012 TOBOLOLO MALUKU UTARA 855 Pre-Electrified - - - 127.34958 0.85478 27295 8271010012 TOBOLOLO MALUKU UTARA 153 Pre-Electrified - - - 127.34651 0.85230 27296 8271010012 TOBOLOLO MALUKU UTARA 155 Pre-Electrified - - - 127.34553 0.84961 27297 8271010013 TOGAFO MALUKU UTARA 706 Pre-Electrified - - - 127.29529 0.81596 27298 8271010014 SULAMADAHA MALUKU UTARA 213 Pre-Electrified - - - 127.34512 0.85750 27299 8271010015 LOTO MALUKU UTARA 869 Pre-Electrified - - - 127.29718 0.82376 27300 8271010016 TAKOME MALUKU UTARA 163 Pre-Electrified - - - 127.31508 0.84658 27301 8271010016 TAKOME MALUKU UTARA 320 Pre-Electrified - - - 127.31163 0.84555 27302 8271010016 TAKOME MALUKU UTARA 499 Pre-Electrified - - - 127.30290 0.84099 27303 8271010026 DORPEDU MALUKU UTARA 615 Pre-Electrified - - - 127.29497 0.79219 27304 8271012001 PANTAI SAGU MALUKU UTARA 175 MiniGrid Systems 42 43 092 8.7 126.14341 0.96833 27305 8271012002 TIFURE MALUKU UTARA 508 MiniGrid Systems 121 124 146 25.0 126.14741 0.97527 27306 8271012003 LELEWI MALUKU UTARA 481 MiniGrid Systems 102 104 652 21.1 126.38706 1.30590 27307 8271012004 MAYAU MALUKU UTARA 844 MiniGrid Systems 194 199 044 40.1 126.37319 1.33583 27308 8271012005 BIDO MALUKU UTARA 338 MiniGrid Systems 88 90 288 18.2 126.39621 1.32825 27309 8271012006 PERUM BERSATU MALUKU UTARA 141 MiniGrid Systems 40 41 040 8.3 126.35878 1.32922 27310 8271020001 SASA MALUKU UTARA 3 848 Pre-Electrified - - - 127.32621 0.75741 27311 8271020001 SASA MALUKU UTARA 85 Pre-Electrified - - - 127.32395 0.75902 27312 8271020002 GAMBESI MALUKU UTARA 1 796 Pre-Electrified - - - 127.33730 0.75807 27313 8271020002 GAMBESI MALUKU UTARA 4 Pre-Electrified - - - 127.33162 0.75763 27314 8271020003 FITU MALUKU UTARA 461 Pre-Electrified - - - 127.33970 0.75712 27315 8271020003 FITU MALUKU UTARA 2 497 Pre-Electrified - - - 127.34340 0.75808 27316 8271020004 KALUMATA MALUKU UTARA 7 613 Pre-Electrified - - - 127.36285 0.76316 27317 8271020005 KAYU MERAH MALUKU UTARA 6 627 Pre-Electrified - - - 127.36911 0.76366 27318 8271020006 BASTIONG TALANGAME MALUKU UTARA 4 040 Pre-Electrified - - - 127.37413 0.76932 27319 8271020007 UBO-UBO MALUKU UTARA 2 423 Pre-Electrified - - - 127.36977 0.76800 27320 8271020008 MANGGA DUA MALUKU UTARA 4 502 Pre-Electrified - - - 127.37700 0.77255 27321 8271020009 JATI MALUKU UTARA 4 804 Pre-Electrified - - - 127.37273 0.77577 27322 8271020010 TOBOKO MALUKU UTARA 2 159 Pre-Electrified - - - 127.38324 0.77692 27323 8271020011 TANAH TINGGI MALUKU UTARA 3 336 Pre-Electrified - - - 127.38017 0.77985 27324 8271020020 NGADE MALUKU UTARA 1 362 Pre-Electrified - - - 127.35498 0.76057 27325 8271020021 BASTIONG KARANCE MALUKU UTARA 5 376 Pre-Electrified - - - 127.37345 0.76521 27326 8271020022 TABONA MALUKU UTARA 3 387 Pre-Electrified - - - 127.36779 0.77091 27327 8271020023 JATI PERUMNAS MALUKU UTARA 2 773 Pre-Electrified - - - 127.37132 0.77481 27328 8271020024 MANGGA DUA UTARA MALUKU UTARA 6 633 Pre-Electrified - - - 127.37971 0.77653 27329 8271020025 TANAH TINGGI BARAT MALUKU UTARA 2 162 Pre-Electrified - - - 127.37381 0.78117 27330 8271021001 MALIARO MALUKU UTARA 7 518 Pre-Electrified - - - 127.37625 0.78545 27331 8271021002 KAMPUNG PISANG MALUKU UTARA 3 001 Pre-Electrified - - - 127.38110 0.78403 27332 8271021003 TAKOMA MALUKU UTARA 2 556 Pre-Electrified - - - 127.38311 0.78146 27333 8271021004 KOTA BARU MALUKU UTARA 2 282 Pre-Electrified - - - 127.38607 0.77953 27334 8271021005 MUHAJIRIN MALUKU UTARA 1 324 Pre-Electrified - - - 127.38783 0.78522 27335 8271021006 TANAH RAJA MALUKU UTARA 1 253 Pre-Electrified - - - 127.38602 0.78559 27336 8271021007 STADION MALUKU UTARA 2 235 Pre-Electrified - - - 127.38398 0.78618 27337 8271021008 MARIKURUBU MALUKU UTARA 1 OffGrid Systems 1 1 026 0.2 127.36240 0.78475 27338 8271021010 SALAHUDDIN MALUKU UTARA 5 015 Pre-Electrified - - - 127.37954 0.79263 27339 8271021011 SANTIONG MALUKU UTARA 4 233 Pre-Electrified - - - 127.38369 0.79167 Annex II – Demand forecast results Page 204 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 27340 8271021012 KALUMPANG MALUKU UTARA 4 083 Pre-Electrified - - - 127.38113 0.78893 27341 8271021013 GAMALAMA MALUKU UTARA 4 153 Pre-Electrified - - - 127.38849 0.79104 27342 8271021014 MAKASSAR TIMUR MALUKU UTARA 6 277 Pre-Electrified - - - 127.38732 0.79588 27343 8271021015 MAKASSAR BARAT MALUKU UTARA 4 355 Pre-Electrified - - - 127.38247 0.79481 27344 8271030006 SOA SIO MALUKU UTARA 2 037 Pre-Electrified - - - 127.38567 0.79909 27345 8271030007 SOA MALUKU UTARA 3 669 Pre-Electrified - - - 127.38211 0.79849 27346 8271030008 SALERO MALUKU UTARA 3 284 Pre-Electrified - - - 127.38465 0.80246 27347 8271030009 KASTURIAN MALUKU UTARA 3 396 Pre-Electrified - - - 127.38127 0.80362 27348 8271030011 TOBOLEU MALUKU UTARA 4 125 Pre-Electrified - - - 127.38378 0.80729 27349 8271030012 SANGAJI MALUKU UTARA 5 491 Pre-Electrified - - - 127.38421 0.81058 27350 8271030013 DUFA DUFA MALUKU UTARA 5 054 Pre-Electrified - - - 127.38579 0.81760 27351 8271030014 TAFURE MALUKU UTARA 3 431 Pre-Electrified - - - 127.38649 0.82753 27352 8271030014 TAFURE MALUKU UTARA 1 957 Pre-Electrified - - - 127.38258 0.82802 27353 8271030015 TABAM MALUKU UTARA 1 773 Pre-Electrified - - - 127.38316 0.83386 27354 8271030016 SANGO MALUKU UTARA 1 678 Pre-Electrified - - - 127.37889 0.83840 27355 8271030017 TARAU MALUKU UTARA 1 177 Pre-Electrified - - - 127.37101 0.84324 27356 8271030018 SANGAJI UTARA MALUKU UTARA 2 917 Pre-Electrified - - - 127.38369 0.81380 27357 8271030019 AKEHUDA MALUKU UTARA 5 243 Pre-Electrified - - - 127.38423 0.82275 27358 8272010003 TONGOWAI MALUKU UTARA 1 350 Pre-Electrified - - - 127.42506 0.62759 27359 8272010004 GURABATI MALUKU UTARA 2 629 Pre-Electrified - - - 127.41489 0.62436 27360 8272010005 TOMALOU MALUKU UTARA 1 238 Pre-Electrified - - - 127.40662 0.62346 27361 8272010005 TOMALOU MALUKU UTARA 1 976 Pre-Electrified - - - 127.40022 0.62320 27362 8272010006 TUGUIHA MALUKU UTARA 553 Pre-Electrified - - - 127.37890 0.63205 27363 8272010006 TUGUIHA MALUKU UTARA 597 Pre-Electrified - - - 127.38944 0.62562 27364 8272010006 TUGUIHA MALUKU UTARA 265 Pre-Electrified - - - 127.39557 0.62468 27365 8272010007 DOKIRI MALUKU UTARA 322 Pre-Electrified - - - 127.37254 0.64046 27366 8272010007 DOKIRI MALUKU UTARA 2 121 Pre-Electrified - - - 127.37495 0.63723 27367 8272010008 TOLOA MALUKU UTARA 308 Pre-Electrified - - - 127.36574 0.66046 27368 8272010008 TOLOA MALUKU UTARA 1 834 Pre-Electrified - - - 127.36680 0.65047 27369 8272010008 TOLOA MALUKU UTARA 121 Pre-Electrified - - - 127.37180 0.64146 27370 8272020001 BOBO MALUKU UTARA 1 639 Pre-Electrified - - - 127.36468 0.66738 27371 8272020002 AFA AFA MALUKU UTARA 826 Pre-Electrified - - - 127.37151 0.67653 27372 8272020003 MAREKU MALUKU UTARA 210 Pre-Electrified - - - 127.37292 0.69685 27373 8272020003 MAREKU MALUKU UTARA 1 146 Pre-Electrified - - - 127.36725 0.68705 27374 8272020003 MAREKU MALUKU UTARA 288 Pre-Electrified - - - 127.36293 0.67896 27375 8272020003 MAREKU MALUKU UTARA 62 Pre-Electrified - - - 127.36367 0.67309 27376 8272020004 OME MALUKU UTARA 85 Pre-Electrified - - - 127.38057 0.71153 27377 8272020004 OME MALUKU UTARA 727 Pre-Electrified - - - 127.38093 0.70879 27378 8272020004 OME MALUKU UTARA 818 Pre-Electrified - - - 127.37427 0.69868 27379 8272020005 JAYA MALUKU UTARA 559 Pre-Electrified - - - 127.40537 0.68924 27380 8272020005 JAYA MALUKU UTARA 84 Pre-Electrified - - - 127.40653 0.68680 27381 8272020005 JAYA MALUKU UTARA 112 Pre-Electrified - - - 127.40987 0.67771 27382 8272020006 FOBAHARU MALUKU UTARA 178 Pre-Electrified - - - 127.39251 0.70878 27383 8272020006 FOBAHARU MALUKU UTARA 345 Pre-Electrified - - - 127.39510 0.70651 27384 8272020006 FOBAHARU MALUKU UTARA 21 Pre-Electrified - - - 127.39780 0.70397 27385 8272020006 FOBAHARU MALUKU UTARA 26 Pre-Electrified - - - 127.39850 0.70309 27386 8272020006 FOBAHARU MALUKU UTARA 43 Pre-Electrified - - - 127.40330 0.70270 27387 8272020007 RUM MALUKU UTARA 2 775 Pre-Electrified - - - 127.38659 0.72139 27388 8272020008 MAITARA MALUKU UTARA 460 Pre-Electrified - - - 127.37813 0.73545 27389 8272020009 GUBU KUSUMA MALUKU UTARA 136 Pre-Electrified - - - 127.37773 0.69290 27390 8272020009 GUBU KUSUMA MALUKU UTARA 440 Pre-Electrified - - - 127.37932 0.69092 27391 8272020011 RUM BALIBUNGA MALUKU UTARA 1 035 Pre-Electrified - - - 127.38668 0.73744 27392 8272020011 RUM BALIBUNGA MALUKU UTARA 248 Pre-Electrified - - - 127.39522 0.75173 27393 8272020011 RUM BALIBUNGA MALUKU UTARA 285 Pre-Electrified - - - 127.39055 0.75157 27394 8272020012 MAITARA SELATAN MALUKU UTARA 561 Pre-Electrified - - - 127.37831 0.73096 27395 8272030007 SELI MALUKU UTARA 1 062 Pre-Electrified - - - 127.43316 0.63837 27396 8272030008 SOADARA MALUKU UTARA 727 Pre-Electrified - - - 127.43850 0.64293 27397 8272030008 SOADARA MALUKU UTARA 86 Pre-Electrified - - - 127.43655 0.64288 27398 8272030010 SOA SIO MALUKU UTARA 1 443 Pre-Electrified - - - 127.44509 0.65329 27399 8272030011 GAMTUFKANGE MALUKU UTARA 2 715 Pre-Electrified - - - 127.44747 0.66039 27400 8272030012 GURA-BUNGA MALUKU UTARA 613 Pre-Electrified - - - 127.42116 0.67459 27401 8272030013 INDONESIANA MALUKU UTARA 4 652 Pre-Electrified - - - 127.45212 0.67450 27402 8272030017 TOPO TIGA MALUKU UTARA 520 Pre-Electrified - - - 127.44032 0.65209 27403 8272030018 TOMAGOBA MALUKU UTARA 2 849 Pre-Electrified - - - 127.44848 0.66801 27404 8272030019 FOLARORA MALUKU UTARA 749 Pre-Electrified - - - 127.42668 0.66657 27405 8272030020 GOTO MALUKU UTARA 2 306 Pre-Electrified - - - 127.45290 0.68063 27406 8272031001 DOWORA MALUKU UTARA 51 Pre-Electrified - - - 127.45755 0.71321 27407 8272031001 DOWORA MALUKU UTARA 414 Pre-Electrified - - - 127.45572 0.71093 27408 8272031001 DOWORA MALUKU UTARA 600 Pre-Electrified - - - 127.45416 0.70562 27409 8272031001 DOWORA MALUKU UTARA 55 Pre-Electrified - - - 127.45647 0.70350 27410 8272031001 DOWORA MALUKU UTARA 44 Pre-Electrified - - - 127.45425 0.70330 27411 8272031001 DOWORA MALUKU UTARA 2 769 Pre-Electrified - - - 127.45390 0.68595 27412 8272031001 DOWORA MALUKU UTARA 16 Pre-Electrified - - - 127.44140 0.70146 27413 8272031001 DOWORA MALUKU UTARA 43 Pre-Electrified - - - 127.45082 0.68997 27414 8272031002 KALAODI MALUKU UTARA 103 Pre-Electrified - - - 127.44028 0.70133 27415 8272031002 KALAODI MALUKU UTARA 153 Pre-Electrified - - - 127.42232 0.69644 27416 8272031003 MAFUTUTU MALUKU UTARA 1 950 Pre-Electrified - - - 127.43774 0.74604 27417 8272031003 MAFUTUTU MALUKU UTARA 189 Pre-Electrified - - - 127.40408 0.75559 27418 8272031003 MAFUTUTU MALUKU UTARA 429 Pre-Electrified - - - 127.42033 0.75120 27419 8272031004 TOSA MALUKU UTARA 446 Pre-Electrified - - - 127.45072 0.73760 27420 8272031004 TOSA MALUKU UTARA 301 Pre-Electrified - - - 127.45430 0.72780 27421 8272040003 KUSU SINOPA MALUKU UTARA 427 Pre-Electrified - - - 127.71370 0.23726 27422 8272040003 KUSU SINOPA MALUKU UTARA 318 Pre-Electrified - - - 127.70883 0.22661 27423 8272040003 KUSU SINOPA MALUKU UTARA 119 Pre-Electrified - - - 127.73349 0.30067 27424 8272040003 KUSU SINOPA MALUKU UTARA 295 Pre-Electrified - - - 127.72186 0.26914 Annex II – Demand forecast results Page 205 of 206 Project ID Village ID Village name Province Population Phase # Households Demand (kwh/year) Peak demand (kW) Longitude Latitude 27425 8272040003 KUSU SINOPA MALUKU UTARA 112 Pre-Electrified - - - 127.71775 0.25241 27426 8272040004 PAYAHE MALUKU UTARA 2 535 Pre-Electrified - - - 127.73238 0.33876 27427 8272040005 TOSEHO MALUKU UTARA 544 Pre-Electrified - - - 127.64211 0.37780 27428 8272040006 GITA RAJA MALUKU UTARA 114 Pre-Electrified - - - 127.61268 0.41282 27429 8272040006 GITA RAJA MALUKU UTARA 1 721 Pre-Electrified - - - 127.62309 0.38920 27430 8272040009 KOSA MALUKU UTARA 648 Pre-Electrified - - - 127.72721 0.38475 27431 8272040010 KOLI MALUKU UTARA 1 179 Pre-Electrified - - - 127.71361 0.39070 27432 8272040011 BALE MALUKU UTARA 98 Pre-Electrified - - - 127.69532 0.39559 27433 8272040011 BALE MALUKU UTARA 250 Pre-Electrified - - - 127.69912 0.39560 27434 8272040011 BALE MALUKU UTARA 5 Pre-Electrified - - - 127.70026 0.39496 27435 8272040012 TULUI TALAGAMORI MALUKU UTARA 198 Pre-Electrified - - - 127.69421 0.39416 27436 8272040012 TULUI TALAGAMORI MALUKU UTARA 839 Pre-Electrified - - - 127.68482 0.39106 27437 8272041003 HAGER MALUKU UTARA 408 Pre-Electrified - - - 127.73360 0.11513 27438 8272041004 WAMA MALUKU UTARA 1 087 Pre-Electrified - - - 127.71318 0.09224 27439 8272041004 WAMA MALUKU UTARA 173 Pre-Electrified - - - 127.71747 0.08467 27440 8272041005 LIFOFA MALUKU UTARA 1 062 Pre-Electrified - - - 127.72241 0.07401 27441 8272041006 NUKU MALUKU UTARA 64 Pre-Electrified - - - 127.70360 0.02159 27442 8272041006 NUKU MALUKU UTARA 514 Pre-Electrified - - - 127.69965 0.01179 27443 8272041007 TAGALAYA MALUKU UTARA 442 Pre-Electrified - - - 127.71406 0.04066 27444 8272050003 SOMAHODE MALUKU UTARA 286 Pre-Electrified - - - 127.54913 0.70715 27445 8272050003 SOMAHODE MALUKU UTARA 243 Pre-Electrified - - - 127.54935 0.70344 27446 8272050004 AKEKOLANO MALUKU UTARA 806 Pre-Electrified - - - 127.56536 0.71059 27447 8272050004 AKEKOLANO MALUKU UTARA 1 Pre-Electrified - - - 127.56903 0.71033 27448 8272050007 GURAPING MALUKU UTARA 297 Pre-Electrified - - - 127.61078 0.76148 27449 8272050007 GURAPING MALUKU UTARA 458 Pre-Electrified - - - 127.60975 0.75735 27450 8272050007 GURAPING MALUKU UTARA 258 Pre-Electrified - - - 127.59846 0.75776 27451 8272050007 GURAPING MALUKU UTARA 1 547 Pre-Electrified - - - 127.59368 0.75609 27452 8272050007 GURAPING MALUKU UTARA 442 Pre-Electrified - - - 127.58165 0.75301 27453 8272050008 KAIYASA MALUKU UTARA 351 Pre-Electrified - - - 127.61696 0.78286 27454 8272050008 KAIYASA MALUKU UTARA 106 Pre-Electrified - - - 127.61611 0.77178 27455 8272050009 GAROJOU MALUKU UTARA 736 Pre-Electrified - - - 127.55630 0.70356 27456 8272050009 GAROJOU MALUKU UTARA 163 Pre-Electrified - - - 127.55630 0.69935 27457 8272050010 KUSU MALUKU UTARA 938 Pre-Electrified - - - 127.55386 0.69250 27458 8272050010 KUSU MALUKU UTARA 54 Pre-Electrified - - - 127.55155 0.68342 27459 8272050010 KUSU MALUKU UTARA 50 Pre-Electrified - - - 127.54552 0.66377 27460 8272050011 AMPERA MALUKU UTARA 571 Pre-Electrified - - - 127.57068 0.71025 27461 8272050012 BUKIT DURIAN MALUKU UTARA 622 Pre-Electrified - - - 127.57708 0.73170 27462 8272050012 BUKIT DURIAN MALUKU UTARA 807 Pre-Electrified - - - 127.57785 0.72492 27463 8272050013 GALALA MALUKU UTARA 877 Pre-Electrified - - - 127.57750 0.74751 27464 8272050013 GALALA MALUKU UTARA 152 Pre-Electrified - - - 127.57104 0.74895 27465 8272050013 GALALA MALUKU UTARA 568 Pre-Electrified - - - 127.57528 0.75197 27466 8272050013 GALALA MALUKU UTARA - Pre-Electrified - - - 127.57067 0.75002 27467 8272050014 BALBAR MALUKU UTARA 2 Pre-Electrified - - - 127.57006 0.74802 27468 8272050014 BALBAR MALUKU UTARA 117 Pre-Electrified - - - 127.56913 0.74721 27469 8272051001 TOGEME MALUKU UTARA 419 Pre-Electrified - - - 127.56849 0.47456 27470 8272051001 TOGEME MALUKU UTARA 493 Pre-Electrified - - - 127.57685 0.44539 27471 8272051002 LOLA MALUKU UTARA 937 Pre-Electrified - - - 127.58260 0.42968 27472 8272051002 LOLA MALUKU UTARA 249 Pre-Electrified - - - 127.59228 0.42629 27473 8272051003 AKELAMO MALUKU UTARA 327 Pre-Electrified - - - 127.53913 0.53755 27474 8272051003 AKELAMO MALUKU UTARA 593 Pre-Electrified - - - 127.54887 0.53416 27475 8272051004 AKEGURACI MALUKU UTARA 412 Pre-Electrified - - - 127.56898 0.48632 27476 8272051004 AKEGURACI MALUKU UTARA 381 Pre-Electrified - - - 127.56526 0.49745 27477 8272051004 AKEGURACI MALUKU UTARA 52 Pre-Electrified - - - 127.56492 0.50031 27478 8272051005 AKESAI MALUKU UTARA 395 Pre-Electrified - - - 127.55717 0.52517 27479 8272051005 AKESAI MALUKU UTARA 300 Pre-Electrified - - - 127.56381 0.51017 27480 8272051006 AKETOBOLOLO MALUKU UTARA 511 Pre-Electrified - - - 127.53261 0.56284 27481 8272051006 AKETOBOLOLO MALUKU UTARA 298 Pre-Electrified - - - 127.53728 0.57454 27482 8272051006 AKETOBOLOLO MALUKU UTARA 14 Pre-Electrified - - - 127.53565 0.56906 27483 8272051007 AKEDOTILOU MALUKU UTARA 947 Pre-Electrified - - - 127.53597 0.58802 27484 8272051008 AKETUBATU MALUKU UTARA 222 Pre-Electrified - - - 127.54278 0.64180 27485 8272051008 AKETUBATU MALUKU UTARA 166 Pre-Electrified - - - 127.53898 0.62637 27486 8272051008 AKETUBATU MALUKU UTARA 159 Pre-Electrified - - - 127.53167 0.61554 27487 8272051009 TADUPI MALUKU UTARA 642 Pre-Electrified - - - 127.58929 0.41545 Annex II – Demand forecast results Page 206 of 206 ANNEX III – RESULTS OF THE PRELIMINARY SITE ASSESSMENT SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING – INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT – ANNEX III: RESULTS OF THE PRELIMINARY SITE ASSESSMENT ANNEX III – RESULTS OF THE PRELIMINARY SITE ASSESSMENT Installed LCOE Protected Project ID Island River capacity IRR (USD/MWh) Area (MW) 1 Meseh-2 JicaPR_1134 Nusa Tenggara Wai Maseh 11,87 67,2 22,7% APL 2 Lapai II hp_0221 Sulawesi 8 97,8 14,5% APL 3 Menu-1 JicaPR_1181 Nusa Tenggara Menu 5,22 71,9 21,2% APL 4 Menu-2 JicaPR_1182 Nusa Tenggara Menu 8,41 72,9 20,9% APL 5 Ria JicaPR_1129 Nusa Tenggara Paseria 8,69 72,4 21,1% APL 6 PLTM Sabuku fs_215 Sulawesi Sabuku 11,16 99,4 14,2% APL 7 Laku JicaPR_1135 Nusa Tenggara Wai Laku 4,71 73,4 20,8% APL 8 Wai Ranjang JicaPR_1116 Nusa Tenggara Wai Ratjang 2,63 87,6 17,2% APL 9 PLTM Paun fs_203 Sulawesi Nosu 15,86 54,8 26,7% APL 10 Meseh-1 JicaPR_1133 Nusa Tenggara Wai Miseh 3,43 79,6 19,1% APL 11 PLTM Ma'dong fs_195 Sulawesi Maiting 8,8 44,9 32,2% APL 12 Tuke JicaPR_1184 Nusa Tenggara Tuke 4,68 86,2 17,5% APL PLTM Maiting Hulu 13 fs_198 Sulawesi Maiting 8,96 57,0 25,7% APL 2 14 PLTM Rongkong 3 fs_206 Sulawesi Rongkong 14,17 71,4 20,5% APL 15 PLTM Sapaya fs_199 Sulawesi Sapaya 8,09 47,9 30,4% APL 16 Ria Mboeli JicaPR_1130 Nusa Tenggara Ria Mboeli 3,82 89,4 16,8% APL 17 PLTM Karangana I fs_210 Sulawesi Karangana 18,78 56,6 25,9% HPT & APL 18 PLTM Yaentu fs_165 Sulawesi Yaentu 15,33 57,6 25,5% HPT 19 PLTM Sapalewa fs_192 Maluku Sapalewa 20,12 58,1 27,3% HPK 20 Rongkong hp_0436 Sulawesi 12,07 99,1 14,3% APL 21 Kalada JicaPR_1093 Nusa Tenggara Kalada 7,26 90,9 16,5% APL 22 PLTM Batukede fs_193 Sulawesi Nosu 6,34 55,0 26,6% APL 23 PLTM Aralle fs_232 Sulawesi Aralle 14,86 73,0 20,0% HPT 24 Lawo Lambo JicaPR_1122 Nusa Tenggara Lawo Lambo 3,51 96,3 15,5% APL 25 Lake JicaPR_1131 Nusa Tenggara Wai Lake 5,74 93,2 16,1% HP & APL 26 Bobo JicaPR_1136 Nusa Tenggara Wai bobo 2 122,6 11,5% APL 27 PLTM Pono fs_163 Sulawesi Kerpap 3,5 103,6 13,5% APL 28 PLTM Masewo fs_223 Sulawesi Karangana 15,45 90,4 15,9% HPT 29 PLTM Tomoni fs_204 Sulawesi Tomoni 9,26 50,3 29,0% HL & HP 30 Muke JicaPR_1183 Nusa Tenggara Muke 3,11 123,8 11,4% APL 31 Rentelemo JicaPR_0811 Sulawesi Mapili 5,21 65,3 22,4% APL 32 PLTM Mapahi fs_213 Sulawesi Karangana 24,59 70,0 20,9% HL 33 Tangkak-1 JicaPR_0793 Sulawesi Tangkak 4,96 70,1 20,9% APL 34 PLTM Karangana II fs_211 Sulawesi Karangana 26,28 73,2 20,0% HL & HPT PLTM Ranowano Sosoan 35 fs_171 Sulawesi 4,33 65,4 22,4% APL Minahasa Ranowangko 36 PLTM Tabong fs_216 Sulawesi Tabong 13,94 137,0 9,3% APL 37 Benain-1 JicaPR_1177 Nusa Tenggara Benain 15,48 133,6 10,2% HP & APL 38 PLTM Pamoseang fs_231 Sulawesi Aralle 7,85 83,4 17,4% HPT 39 PLTA Tina fs_234 Maluku Tina 10,08 116,3 13,0% HP 1 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING – INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT – ANNEX III: RESULTS OF THE PRELIMINARY SITE ASSESSMENT Installed LCOE Protected Project ID Island River capacity IRR (USD/MWh) Area (MW) 40 PLTM Siyuntoyo fs_227 Sulawesi 4,17 149,9 8,1% HPT 41 PLTM Sampaga fs_162 Sulawesi Sampaga 1,26 155,1 7,7% APL 42 Mikuasi (PLN) hp_0447 Sulawesi 2,67 103,2 13,6% HL 43 Manasako JicaPR_1190 Nusa Tenggara Manasako 7,82 64,0 23,9% HL 44 Buleleng hp_0456 Sulawesi 3,91 93,1 15,4% HPT & HPK 45 PLTM Kindang 2 fs_205 Sulawesi Balantieng 3,45 74,6 19,6% APL 46 PLTM Tincep 3 fs_173 Sulawesi Munthe 3,15 72,7 20,1% APL PLTM 47 fs_208 Sulawesi Balantieng 2,88 69,9 21,0% APL Bontomantene 48 Kuala Tengah fs_221 Sulawesi Kuala Tengah 5,37 101,8 13,8% APL Tributary of 49 Lariang-11 JicaPR_0841 Sulawesi 10,7 129,7 10,1% HPT Lariang 50 Anail JicaPR_1188 Nusa Tenggara Anail 4,64 95,7 15,6% APL 51 Karendi-2 JicaPR_1092 Nusa Tenggara Karendi 2,33 110,1 13,2% HL & APL 52 PLTM Wae Lega fs_236 Nusa Tenggara Wae Lega 2,34 72,7 21,0% APL 53 Sawidago-1 #1 hp_0367 Sulawesi 2,15 71,8 20,4% APL 54 Randangan-2 JicaPR_0718 Sulawesi Randangan 5,52 82,9 17,5% HPT 55 Noni JicaPR_1138 Nusa Tenggara Tarumanu 3,47 89,5 16,9% APL 56 Kamatang-2 JicaPR_1100 Nusa Tenggara Kamatang 4,6 105,2 14,0% APL 57 Leke JicaPR_1185 Nusa Tenggara Leke 1,77 96,5 15,4% APL 58 PLTM Bungin 2 fs_207 Sulawesi Bungin 4,91 61,5 23,9% HL 59 Waikudu JicaPR_1104 Nusa Tenggara Waikudu 4,22 84,7 17,9% HPK & APL 60 Wai Ru JicaPR_1115 Nusa Tenggara Wai Ru 2,39 93,6 16,0% APL 61 PLTM Harunda fs_242 Nusa Tenggara Harunda 3,06 74,4 20,5% HPT & APL 62 Gamputa JicaPR_0858 Sulawesi Gamputa 5,01 99,4 14,2% HPK 63 Palu-2A JicaPR_0845 Sulawesi Plau 5,03 131,0 9,9% APL 64 Mata Alo-1 JicaPR_0806 Sulawesi Pasui 3,12 107,3 12,9% APL 65 Palame-2 JicaPR_1095 Nusa Tenggara Palamedo 4,08 113,2 12,9% HPT & APL PLTM Bongkasoa- Bongkasoa 66 fs_160 Sulawesi 1,65 92,0 15,5% APL Simpoyo Simpoya 67 Buol-1 JicaPR_0850 Sulawesi Buol 4,08 124,5 10,7% APL 68 Ngodama JicaPR_1236 Maluku Ngodana 5,69 113,9 13,3% HPT 69 Wooi Besar-2 JicaPR_1250 Maluku Wooi Besar 8,23 146,3 9,5% HP 70 Wai Racang JicaEX_0108 Nusa Tenggara Wai Racang 1,5 97,6 15,2% APL 71 PLTM Lobu fs_222 Sulawesi Lobu 3,54 93,4 15,3% HPT 72 Taramanu-1 JicaPR_1139 Nusa Tenggara Tarumanu 3,57 127,5 10,9% APL 73 Wajo-2 JicaPR_1128 Nusa Tenggara Lowo Mego 0,85 221,0 4,0% APL 74 Nowa JicaPR_1114 Nusa Tenggara Nowa 1,16 175,3 6,7% HP & APL 75 Rita JicaPR_1107 Nusa Tenggara Rita 2,47 164,9 7,4% APL 76 PLTM Pasui 2 fs_184 Sulawesi Pasui 1,74 113,7 12,0% APL 77 Halulai hp_0391 Sulawesi 2,21 88,6 16,2% HPT 78 Kamatang-1 JicaPR_1099 Nusa Tenggara Kamatang 2,53 149,2 8,8% APL 79 Siwa JicaPR_0781 Sulawesi Siwa 1,8 116,0 11,7% APL PLTM Benteng 80 fs_194 Sulawesi Bialo 1,33 111,0 12,4% APL Malewang 81 Ilanga-1 JicaPR_0854 Sulawesi llanga 5,52 133,5 9,7% HPT 2 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING – INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT – ANNEX III: RESULTS OF THE PRELIMINARY SITE ASSESSMENT Installed LCOE Protected Project ID Island River capacity IRR (USD/MWh) Area (MW) 82 Dondo-3 JicaPR_1126 Nusa Tenggara Lawo Dondo 1,94 205,3 4,8% APL Botaonyo 83 Maraja-3 JicaPR_0848 Sulawesi 1,18 164,9 6,9% HPT & APL Maraja 84 Lakalamba JicaPR_1101 Nusa Tenggara Lakalamba 1,15 126,0 11,1% HP 85 Kuala Kilo fs_220 Sulawesi Kuala Kilo 5,27 166,3 6,8% APL 86 Palame-1 JicaPR_1094 Nusa Tenggara Palamedo 1,88 157,9 8,0% HPT & APL 87 PLTM Malua fs_188 Sulawesi Malua 1,48 121,0 11,1% APL 88 Lamo-2 JicaPR_1233 Maluku Lamo 4,06 160,6 8,3% APL 89 Paddumpu hp_0311 Sulawesi 1,91 107,7 12,9% HPT & APL 90 Jajawi JicaPR_1230 Maluku Tajawi 6,52 134,8 10,7% HL 91 Watumbaka JicaPR_1109 Nusa Tenggara Walumbaka 1,52 170,0 7,0% HP & APL 92 Batuputi JicaPR_0786 Sulawesi Batuputi 1,96 144,9 8,6% APL 93 Ranoyapo-1 JicaPR_0867 Sulawesi Ranojapo 2,84 127,0 10,4% HP 94 Sawidago-3 hp_0394 Sulawesi 1,87 84,1 17,2% HL 95 PLTMH Eremerasa fs_181 Sulawesi Jene Biyangloe 0,59 132,7 9,8% APL 96 Poigar-4 JicaPR_0866 Sulawesi Poigar 2,61 137,6 9,3% HP 97 Melolo-2 JicaPR_1111 Nusa Tenggara Melolo 1,98 167,0 7,3% HL 98 Ranu-2 JicaPR_1206 Maluku Nibe 5,46 145,7 9,7% HL 99 PLTM Kahaya fs_180 Sulawesi Balantieng 2,23 106,0 13,1% HL & APL 100 Pastu Ra JicaPR_1247 Maluku Pastu Ra 1,29 179,9 6,8% HL 101 Riorita hp_0401 Sulawesi 2,13 105,4 12,9% HL & APL 102 Nua JicaPR_1222 Maluku Wae Nua 4,03 160,9 8,2% HPK 103 Taramanu-2 JicaPR_1140 Nusa Tenggara Tarumanu 4,11 197,3 5,3% APL 104 Kapsali JicaPR_1141 Nusa Tenggara Tarumanu 1,57 159,6 7,8% HPT 105 PLTM Soru fs_237 Nusa Tenggara Cikur 0,66 154,9 8,2% APL 106 PLTM Wanokaka 2 fs_246 Nusa Tenggara Labariri 0,64 155,5 8,2% APL Tributary of 107 Lariang-10 JicaPR_0840 Sulawesi 5,52 154,1 7,8% HL & HPT Lariang 108 Dondo-1 JicaPR_1124 Nusa Tenggara Lawo Dondo 0,96 163,9 7,5% APL 109 Melolo-1 JicaPR_1110 Nusa Tenggara Melolo 0,82 190,4 5,7% HL & APL 110 Paca JicaPR_1234 Maluku Danau Paca 0,49 238,6 3,5% HPK 111 Larana JicaPR_1191 Nusa Tenggara Larana 0,6 168,4 7,2% APL 112 Irauri JicaPR_1189 Nusa Tenggara Irauri 3,14 78,1 19,5% HSA-W 113 PLTM Tirtanagaya fs_229 Sulawesi 2,07 159,6 7,3% HPT 114 Bajo JicaPR_0779 Sulawesi Bajo 1,2 181,2 5,8% APL 115 Taima JicaPR_0729 Sulawesi Taima 1,6 187,7 5,5% APL 116 Mama JicaPR_1204 Maluku Wa Mana 1,84 161,4 8,2% HPT 117 Leman JicaPR_1208 Maluku Wa Leman 1,36 225,0 4,2% HPK 118 PLTM Dako fs_161 Sulawesi Dako 0,43 179,9 5,9% APL 119 Toma-2 JicaPR_0754 Sulawesi Lawe Toma 1,66 208,6 4,2% HL 120 Kambera-3 JicaPR_1105 Nusa Tenggara Kambera 2,54 244,0 2,8% APL 121 PLTM Bengkoli fs_168 Sulawesi Bengkoli 1,57 179,0 5,9% HPT & APL 122 Kadassa-2 JicaPR_1097 Nusa Tenggara Kadassa 2,61 268,6 1,9% APL 123 PLTM Kadundung fs_202 Sulawesi Bajo 1,17 144,8 8,6% HL 124 Iwoimenda JicaPR_0764 Sulawesi S.Iwoimenda 2,39 163,8 7,0% HL 3 ID.2016.R.007.1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANNING – INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT – ANNEX III: RESULTS OF THE PRELIMINARY SITE ASSESSMENT Installed LCOE Protected Project ID Island River capacity IRR (USD/MWh) Area (MW) 125 PLTM Sinombulung fs_228 Sulawesi 2,98 204,1 4,4% HPT 126 Liocopa JicaPR_1224 Maluku Liocopa 1,03 244,8 3,3% HP 127 PLTM Ponju fs_169 Sulawesi Balukang 0,76 177,3 6,0% HPT 128 Paguyaman-1 JicaPR_0715 Sulawesi Paguyaman 3,83 126,5 10,4% HSA-W 129 Kambera-1 JicaPR_1102 Nusa Tenggara Kanjiji 0,61 326,2 -0,2% APL Onggak 130 Dumoga-1 JicaPR_0860 Sulawesi 3,38 126,3 10,5% HSA-W Dumogao 131 Labu-2 JicaPR_0734 Sulawesi Labu 0,92 223,3 3,4% APL HL, HPT & 132 Pia JicaPR_1221 Maluku Wae Pia 3,46 196,8 5,8% HPK 133 Lamuk JicaPR_1106 Nusa Tenggara Lamuk 0,82 234,0 3,3% HL & APL 134 Ili-1 JicaPR_1201 Maluku Wa Ili 4,82 220,2 4,5% HL & HPT 135 Wai Miha JicaPR_1251 Maluku Wai Miha 1,35 254,3 2,8% HP 136 Makariki hp_0216 Maluku 1,04 211,3 4,9% HPK 137 Awo JicaPR_0780 Sulawesi Awo 0,79 193,1 5,1% HL 138 Kolori hp_0281 Sulawesi 0,75 131,8 9,8% HSA-W 139 Lasolo-2 JicaPR_0751 Sulawesi Lasolo 2,36 417,9 -3,2% HL 140 Mala JicaPR_1220 Maluku Wae Mala 2,39 246,9 3,2% HPT 141 Bayau-1 JicaPR_0856 Sulawesi Bayau 1,94 260,0 1,7% HPT 142 Sissa JicaPR_1121 Nusa Tenggara Sissa 1,37 285,6 1,2% APL 143 PLTM Pidung fs_174 Sulawesi Onggunoi 0,56 251,4 2,1% HPT 144 Lelipang hp_0297 Sulawesi 0,38 283,3 0,8% APL 145 Kalempang-3 JicaPR_0792 Sulawesi Rica 0,39 287,7 0,7% APL 146 Dopi JicaPR_0747 Sulawesi Dopi 3,46 574,3 -6,5% HPT 147 Malik JicaPR_0735 Sulawesi Malik 0,3 350,3 -1,4% APL 148 Lot JicaPR_1228 Maluku Loi 0,19 497,2 -4,3% APL 149 Kina JicaPR_1217 Maluku Wai Wakina 1,16 323,6 0,3% HPT 150 Sumara JicaPR_0740 Sulawesi Sumara 1,34 208,7 4,2% HSA-W HSA-W & 151 Ayoung JicaPR_0859 Sulawesi Ayong 1,69 229,5 3,1% APL 152 Toma-4 JicaPR_0756 Sulawesi Lawe Toma 1,52 355,7 -1,6% HL & HPK 153 Toma-3 JicaPR_0755 Sulawesi Lawe Toma 0,59 888,7 -10,5% HL 154 Ela JicaPR_1227 Maluku Ela 0,2105 555,5 -5,4% HL 155 Bonehau hp_0448 Sulawesi 0,21 387,8 -2,5% HL & APL 4 ID.2016.R.007.1 ANNEX IV - MULTI-CRITERIA RESULTS SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Multi-criteria results Protected Local Protected Local Installed Installed and Enviro. Electrif. LCOE LCOE and Enviro. Electrif. Project ID Code Capacity Capacity Sensitive Demand (USD/MWh) Score Sensitive Demand (MW) Score Areas Radius Areas Score Score (km) PLTM Bongkasoa- fs_160 1,7 1,7 92 8,3 APL 10,0 0,0 Simpoyo PLTM Dako fs_161 0,4 0,4 180 4,8 APL 10,0 0,0 PLTM Sampaga fs_162 1,3 1,3 155 5,8 APL 10,0 7,5 9,2 PLTM Pono fs_163 3,5 3,5 104 7,9 APL 10,0 20 5,2 PLTM Yaentu fs_165 15,3 10,0 58 9,7 HPT 7,5 0,0 PLTM Bengkoli fs_168 1,6 1,6 179 4,8 HPT 7,5 0,0 PLTM Ponju fs_169 0,8 0,8 177 4,9 HPT 7,5 0,0 PLTM Ranowano fs_171 4,3 4,3 65 9,4 APL 10,0 0,0 Minahasa PLTM Tincep 3 fs_173 3,2 3,2 73 9,1 APL 10,0 0,0 PLTM Pidung fs_174 0,6 0,6 251 1,9 HPT 7,5 0,0 PLTM Kahaya fs_180 2,2 2,2 106 7,8 HL 5,0 0,0 PLTMH Eremerasa fs_181 0,6 0,6 133 6,7 APL 10,0 0,0 PLTM Pasui 2 fs_184 1,7 1,7 114 7,5 APL 10,0 0,0 PLTM Malua fs_188 1,5 1,5 121 7,2 APL 10,0 0,0 PLTM Sapalewa fs_192 20,1 10,0 58 9,7 HPK 7,5 0,0 PLTM Batukede fs_193 6,3 6,3 55 9,8 APL 10,0 0,0 PLTM Benteng fs_194 1,3 1,3 111 7,6 APL 10,0 0,0 Malewang PLTM Ma'dong fs_195 8,8 8,8 45 10,0 APL 10,0 0,0 PLTM Maiting Hulu 2 fs_198 9,0 9,0 57 9,7 APL 10,0 0,0 PLTM Sapaya fs_199 8,1 8,1 48 10,0 APL 10,0 0,0 PLTM Kadundung fs_202 1,2 1,2 145 6,2 HL 5,0 0,0 PLTM Paun fs_203 15,9 10,0 55 9,8 APL 10,0 0,0 PLTM Tomoni fs_204 9,3 9,3 50 10,0 HL 5,0 0,0 PLTM Kindang 2 fs_205 3,5 3,5 75 9,0 APL 10,0 0,0 PLTM Rongkong 3 fs_206 14,2 10,0 71 9,1 APL 10,0 0,0 PLTM Bungin 2 fs_207 4,9 4,9 61 9,5 HL 5,0 0,0 PLTM Bontomantene fs_208 2,9 2,9 70 9,2 APL 10,0 0,0 PLTM Karangana I fs_210 18,8 10,0 57 9,7 HPT 7,5 0,0 PLTM Karangana II fs_211 26,3 10,0 73 9,1 HL 5,0 0,0 PLTM Mapahi fs_213 24,6 10,0 70 9,2 HL 5,0 0,0 PLTM Sabuku fs_215 11,2 10,0 99 8,0 APL 10,0 25 3,6 PLTM Tabong fs_216 13,9 10,0 137 6,5 APL 10,0 0,0 Kuala Kilo fs_220 5,3 5,3 166 5,3 APL 10,0 0,0 Kuala Tengah fs_221 5,4 5,4 102 7,9 APL 10,0 0,0 PLTM Lobu fs_222 3,5 3,5 93 8,3 HPT 7,5 0,0 PLTM Masewo fs_223 15,5 10,0 90 8,4 HPT 7,5 0,0 PLTM Siyuntoyo fs_227 4,2 4,2 150 6,0 HPT 7,5 10 8,4 Annex IV – Multi-criteria results 1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Protected Local Protected Local Installed Installed and Enviro. Electrif. LCOE LCOE and Enviro. Electrif. Project ID Code Capacity Capacity Sensitive Demand (USD/MWh) Score Sensitive Demand (MW) Score Areas Radius Areas Score Score (km) PLTM Sinombulung fs_228 3,0 3,0 204 3,8 HPT 7,5 0,0 PLTM Tirtanagaya fs_229 2,1 2,1 160 5,6 HPT 7,5 0,0 PLTM Pamoseang fs_231 7,9 7,9 83 8,7 HPT 7,5 0,0 PLTM Aralle fs_232 14,9 10,0 73 9,1 HPT 7,5 0,0 PLTA Tina fs_234 10,1 10,0 116 7,3 HP 7,5 0,0 PLTM Wae Lega fs_236 2,3 2,3 73 9,1 APL 10,0 0,0 PLTM Soru fs_237 0,7 0,7 155 5,8 APL 10,0 0,0 PLTM Harunda fs_242 3,1 3,1 74 9,0 HPT 7,5 0,0 PLTM Wanokaka 2 fs_246 0,6 0,6 156 5,8 APL 10,0 0,0 Makariki hp_0216 1,0 1,0 211 3,5 HPK 7,5 0,0 Lapai II hp_0221 8,0 8,0 98 8,1 APL 10,0 10 8,4 Kolori hp_0281 0,8 0,8 132 6,7 HSA-W 0,0 0,0 Lelipang hp_0297 0,4 0,4 283 0,7 APL 10,0 0,0 Paddumpu hp_0311 1,9 1,9 108 7,7 HPT 7,5 0,0 Sawidago-1 #1 hp_0367 2,2 2,2 72 9,1 APL 10,0 0,0 Halulai hp_0391 2,2 2,2 89 8,5 HPT 7,5 0,0 Sawidago-3 hp_0394 1,9 1,9 84 8,6 HL 5,0 0,0 Riorita hp_0401 2,1 2,1 105 7,8 HL 5,0 0,0 Rongkong hp_0436 12,1 10,0 99 8,0 APL 10,0 0,0 Mikuasi (PLN) hp_0447 2,7 2,7 103 7,9 HL 5,0 10 8,4 Bonehau hp_0448 0,2 0,2 388 0,0 HL 5,0 0,0 Buleleng hp_0456 3,9 3,9 93 8,3 HPT 7,5 25 3,6 Wai Racang JicaEX_0108 1,5 1,5 98 8,1 APL 10,0 0,0 Paguyaman-1 JicaPR_0715 3,8 3,8 126 6,9 HSA-W 0,0 0,0 Randangan-2 JicaPR_0718 5,5 5,5 83 8,7 HPT 7,5 0,0 Taima JicaPR_0729 1,6 1,6 188 4,5 APL 10,0 0,0 Labu-2 JicaPR_0734 0,9 0,9 223 3,1 APL 10,0 0,0 Malik JicaPR_0735 0,3 0,3 350 0,0 APL 10,0 0,0 Sumara JicaPR_0740 1,3 1,3 209 3,7 HSA-W 0,0 0,0 Dopi JicaPR_0747 3,5 3,5 574 0,0 HPT 7,5 0,0 Lasolo-2 JicaPR_0751 2,4 2,4 418 0,0 HL 5,0 15 6,8 Toma-2 JicaPR_0754 1,7 1,7 209 3,7 HL 5,0 20 5,2 Toma-3 JicaPR_0755 0,6 0,6 889 0,0 HL 5,0 0,0 Toma-4 JicaPR_0756 1,5 1,5 356 0,0 HL 5,0 0,0 Iwoimenda JicaPR_0764 2,4 2,4 164 5,4 HL 5,0 0,0 Bajo JicaPR_0779 1,2 1,2 181 4,8 APL 10,0 0,0 Awo JicaPR_0780 0,8 0,8 193 4,3 HL 5,0 0,0 Siwa JicaPR_0781 1,8 1,8 116 7,4 APL 10,0 0,0 Batuputi JicaPR_0786 2,0 2,0 145 6,2 APL 10,0 0,0 Kalempang-3 JicaPR_0792 0,4 0,4 288 0,5 APL 10,0 0,0 Tangkak-1 JicaPR_0793 5,0 5,0 70 9,2 APL 10,0 0,0 Annex IV – Multi-criteria results 2 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Protected Local Protected Local Installed Installed and Enviro. Electrif. LCOE LCOE and Enviro. Electrif. Project ID Code Capacity Capacity Sensitive Demand (USD/MWh) Score Sensitive Demand (MW) Score Areas Radius Areas Score Score (km) Mata Alo-1 JicaPR_0806 3,1 3,1 107 7,7 APL 10,0 0,0 Rentelemo JicaPR_0811 5,2 5,2 65 9,4 APL 10,0 0,0 Lariang-10 JicaPR_0840 5,5 5,5 154 5,8 HL 5,0 0,0 Lariang-11 JicaPR_0841 10,7 10,0 130 6,8 HPT 7,5 0,0 Palu-2A JicaPR_0845 5,0 5,0 131 6,8 APL 10,0 0,0 Maraja-3 JicaPR_0848 1,2 1,2 165 5,4 HPT 7,5 15 6,8 Buol-1 JicaPR_0850 4,1 4,1 124 7,0 APL 10,0 0,0 Ilanga-1 JicaPR_0854 5,5 5,5 133 6,7 HPT 7,5 0,0 Bayau-1 JicaPR_0856 1,9 1,9 260 1,6 HPT 7,5 0,0 Gamputa JicaPR_0858 5,0 5,0 99 8,0 HPK 7,5 0,0 Ayoung JicaPR_0859 1,7 1,7 230 2,8 HSA-W 0,0 0,0 Dumoga-1 JicaPR_0860 3,4 3,4 126 6,9 HSA-W 0,0 0,0 Poigar-4 JicaPR_0866 2,6 2,6 138 6,5 HP 7,5 0,0 Ranoyapo-1 JicaPR_0867 2,8 2,8 127 6,9 HP 7,5 0,0 Karendi-2 JicaPR_1092 2,3 2,3 110 7,6 HL 5,0 10 8,4 Kalada JicaPR_1093 7,3 7,3 91 8,4 APL 10,0 30 2,0 Palame-1 JicaPR_1094 1,9 1,9 158 5,7 HPT 7,5 20 5,2 Palame-2 JicaPR_1095 4,1 4,1 113 7,5 HPT 7,5 30 2,0 Kadassa-2 JicaPR_1097 2,6 2,6 269 1,3 APL 10,0 25 3,6 Kamatang-1 JicaPR_1099 2,5 2,5 149 6,0 APL 10,0 30 2,0 Kamatang-2 JicaPR_1100 4,6 4,6 105 7,8 APL 10,0 0,0 Lakalamba JicaPR_1101 1,2 1,2 126 7,0 HP 7,5 25 3,6 Kambera-1 JicaPR_1102 0,6 0,6 326 0,0 APL 10,0 15 6,8 Waikudu JicaPR_1104 4,2 4,2 85 8,6 HPK 7,5 0,0 Kambera-3 JicaPR_1105 2,5 2,5 244 2,2 APL 10,0 30 2,0 Lamuk JicaPR_1106 0,8 0,8 234 2,6 HL 5,0 20 5,2 Rita JicaPR_1107 2,5 2,5 165 5,4 APL 10,0 25 3,6 Watumbaka JicaPR_1109 1,5 1,5 170 5,2 HP 7,5 20 5,2 Melolo-1 JicaPR_1110 0,8 0,8 190 4,4 HL 5,0 15 6,8 Melolo-2 JicaPR_1111 2,0 2,0 167 5,3 HL 5,0 20 5,2 Nowa JicaPR_1114 1,2 1,2 175 5,0 HP 7,5 10 8,4 Wai Ru JicaPR_1115 2,4 2,4 94 8,3 APL 10,0 0,0 Wai Ranjang JicaPR_1116 2,6 2,6 88 8,5 APL 10,0 5 10,0 Sissa JicaPR_1121 1,4 1,4 286 0,6 APL 10,0 0,0 Lawo Lambo JicaPR_1122 3,5 3,5 96 8,1 APL 10,0 20 5,2 Dondo-1 JicaPR_1124 1,0 1,0 164 5,4 APL 10,0 0,0 Dondo-3 JicaPR_1126 1,9 1,9 205 3,8 APL 10,0 15 6,8 Wajo-2 JicaPR_1128 0,9 0,9 221 3,2 APL 10,0 5 10,0 Ria JicaPR_1129 8,7 8,7 72 9,1 APL 10,0 25 3,6 Ria Mboeli JicaPR_1130 3,8 3,8 89 8,4 APL 10,0 15 6,8 Lake JicaPR_1131 5,7 5,7 93 8,3 HP 7,5 20 5,2 Annex IV – Multi-criteria results 3 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Protected Local Protected Local Installed Installed and Enviro. Electrif. LCOE LCOE and Enviro. Electrif. Project ID Code Capacity Capacity Sensitive Demand (USD/MWh) Score Sensitive Demand (MW) Score Areas Radius Areas Score Score (km) Meseh-1 JicaPR_1133 3,4 3,4 80 8,8 APL 10,0 10 8,4 Meseh-2 JicaPR_1134 11,9 10,0 67 9,3 APL 10,0 20 5,2 Laku JicaPR_1135 4,7 4,7 73 9,1 APL 10,0 15 6,8 Bobo JicaPR_1136 2,0 2,0 123 7,1 APL 10,0 10 8,4 Noni JicaPR_1138 3,5 3,5 90 8,4 APL 10,0 0,0 Taramanu-1 JicaPR_1139 3,6 3,6 127 6,9 APL 10,0 0,0 Taramanu-2 JicaPR_1140 4,1 4,1 197 4,1 APL 10,0 0,0 Kapsali JicaPR_1141 1,6 1,6 160 5,6 HPT 7,5 30 2,0 Benain-1 JicaPR_1177 15,5 10,0 134 6,7 HP 7,5 30 2,0 Menu-1 JicaPR_1181 5,2 5,2 72 9,1 APL 10,0 10 8,4 Menu-2 JicaPR_1182 8,4 8,4 73 9,1 APL 10,0 20 5,2 Muke JicaPR_1183 3,1 3,1 124 7,0 APL 10,0 15 6,8 Tuke JicaPR_1184 4,7 4,7 86 8,6 APL 10,0 15 6,8 Leke JicaPR_1185 1,8 1,8 96 8,1 APL 10,0 30 2,0 Anail JicaPR_1188 4,6 4,6 96 8,2 APL 10,0 0,0 Irauri JicaPR_1189 3,1 3,1 78 8,9 HSA-W 0,0 0,0 Manasako JicaPR_1190 7,8 7,8 64 9,4 HL 5,0 0,0 Larana JicaPR_1191 0,6 0,6 168 5,3 APL 10,0 0,0 Ili-1 JicaPR_1201 4,8 4,8 220 3,2 HL 5,0 0,0 Mama JicaPR_1204 1,8 1,8 161 5,5 HPT 7,5 0,0 Ranu-2 JicaPR_1206 5,5 5,5 146 6,2 HL 5,0 0,0 Leman JicaPR_1208 1,4 1,4 225 3,0 HPK 7,5 20 5,2 Kina JicaPR_1217 1,2 1,2 324 0,0 HPT 7,5 0,0 Mala JicaPR_1220 2,4 2,4 247 2,1 HPT 7,5 0,0 Pia JicaPR_1221 3,5 3,5 197 4,1 HL 5,0 0,0 Nua JicaPR_1222 4,0 4,0 161 5,6 HPK 7,5 0,0 Liocopa JicaPR_1224 1,0 1,0 245 2,2 HP 7,5 20 5,2 Ela JicaPR_1227 0,2 0,2 556 0,0 HL 5,0 0,0 Lot JicaPR_1228 0,2 0,2 497 0,0 APL 10,0 0,0 Jajawi JicaPR_1230 6,5 6,5 135 6,6 HL 5,0 0,0 Lamo-2 JicaPR_1233 4,1 4,1 161 5,6 APL 10,0 0,0 Paca JicaPR_1234 0,5 0,5 239 2,5 HPK 7,5 10 8,4 Ngodama JicaPR_1236 5,7 5,7 114 7,4 HPT 7,5 0,0 Pastu Ra JicaPR_1247 1,3 1,3 180 4,8 HL 5,0 15 6,8 Wooi Besar-2 JicaPR_1250 8,2 8,2 146 6,1 HP 7,5 0,0 Wai Miha JicaPR_1251 1,4 1,4 254 1,8 HP 7,5 25 3,6 Annex IV – Multi-criteria results 4 ANNEX V - LIST OF MOST PROMISING SITES - BASE STRATEGY SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT List of most promising sites – Base strategy Installed Local LCOE Protected Weighted Project ID Island capacity Electrification - (USD/MWh) Area score (MW) Radius (km) 1 Meseh-2 JicaPR_1134 Nusa Tenggara 11,9 67 APL 20 8,8 2 Lapai II hp_0221 Sulawesi 8,0 98 APL 10 8,5 3 Menu-1 JicaPR_1181 Nusa Tenggara 5,2 72 APL 10 8,4 4 Menu-2 JicaPR_1182 Nusa Tenggara 8,4 73 APL 20 8,4 5 Ria JicaPR_1129 Nusa Tenggara 8,7 72 APL 25 8,1 6 PLTM Sabuku fs_215 Sulawesi 11,2 99 APL 25 7,9 7 Laku JicaPR_1135 Nusa Tenggara 4,7 73 APL 15 7,9 8 Wai Ranjang JicaPR_1116 Nusa Tenggara 2,6 88 APL 5 7,9 9 PLTM Paun fs_203 Sulawesi 15,9 55 APL 7,9 10 Meseh-1 JicaPR_1133 Nusa Tenggara 3,4 80 APL 10 7,9 11 PLTM Ma'dong fs_195 Sulawesi 8,8 45 APL 7,8 12 Tuke JicaPR_1184 Nusa Tenggara 4,7 86 APL 15 7,7 13 PLTM Maiting Hulu 2 fs_198 Sulawesi 9,0 57 APL 7,7 14 PLTM Rongkong 3 fs_206 Sulawesi 14,2 71 APL 7,7 15 PLTM Sapaya fs_199 Sulawesi 8,1 48 APL 7,6 16 Ria Mboeli JicaPR_1130 Nusa Tenggara 3,8 89 APL 15 7,5 17 PLTM Karangana I fs_210 Sulawesi 18,8 57 HPT & APL 7,4 18 PLTM Yaentu fs_165 Sulawesi 15,3 58 HPT 7,4 19 PLTM Sapalewa fs_192 Maluku 20,1 58 HPK 7,4 20 Rongkong hp_0436 Sulawesi 12,1 99 APL 7,2 21 Kalada JicaPR_1093 Nusa Tenggara 7,3 91 APL 30 7,2 22 PLTM Batukede fs_193 Sulawesi 6,3 55 APL 7,2 23 PLTM Aralle fs_232 Sulawesi 14,9 73 HPT 7,1 24 Lawo Lambo JicaPR_1122 Nusa Tenggara 3,5 96 APL 20 7,0 25 Lake JicaPR_1131 Nusa Tenggara 5,7 93 HP & APL 20 7,0 26 Bobo JicaPR_1136 Nusa Tenggara 2,0 123 APL 10 6,9 27 PLTM Pono fs_163 Sulawesi 3,5 104 APL 20 6,9 28 PLTM Masewo fs_223 Sulawesi 15,5 90 HPT 6,9 29 PLTM Tomoni fs_204 Sulawesi 9,3 50 HL & HP 6,8 30 Muke JicaPR_1183 Nusa Tenggara 3,1 124 APL 15 6,8 31 Rentelemo JicaPR_0811 Sulawesi 5,2 65 APL 6,8 32 PLTM Mapahi fs_213 Sulawesi 24,6 70 HL 6,7 33 Tangkak-1 JicaPR_0793 Sulawesi 5,0 70 APL 6,7 34 PLTM Karangana II fs_211 Sulawesi 26,3 73 HL & HPT 6,6 PLTM Ranowano 35 fs_171 Sulawesi 4,3 65 APL 6,6 Minahasa 36 PLTM Tabong fs_216 Sulawesi 13,9 137 APL 6,6 37 Benain-1 JicaPR_1177 Nusa Tenggara 15,5 134 HP & APL 30 6,6 38 PLTM Pamoseang fs_231 Sulawesi 7,9 83 HPT 6,5 39 PLTA Tina fs_234 Maluku 10,1 116 HP 6,4 40 PLTM Siyuntoyo fs_227 Sulawesi 4,2 150 HPT 10 6,4 41 PLTM Sampaga fs_162 Sulawesi 1,3 155 APL 8 6,4 Annex V – List of most promising sites - Base strategy 1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Installed Local LCOE Protected Weighted Project ID Island capacity Electrification - (USD/MWh) Area score (MW) Radius (km) 42 Mikuasi (PLN) hp_0447 Sulawesi 2,7 103 HL 10 6,4 43 Manasako JicaPR_1190 Nusa Tenggara 7,8 64 HL 6,3 44 Buleleng hp_0456 Sulawesi 3,9 93 HPT & HPK 25 6,3 45 PLTM Kindang 2 fs_205 Sulawesi 3,5 75 APL 6,3 46 PLTM Tincep 3 fs_173 Sulawesi 3,2 73 APL 6,3 PLTM 47 fs_208 Sulawesi 2,9 70 APL 6,3 Bontomantene 48 Kuala Tengah fs_221 Sulawesi 5,4 102 APL 6,2 49 Lariang-11 JicaPR_0841 Sulawesi 10,7 130 HPT 6,2 50 Anail JicaPR_1188 Nusa Tenggara 4,6 96 APL 6,2 51 Karendi-2 JicaPR_1092 Nusa Tenggara 2,3 110 HL & APL 10 6,2 52 PLTM Wae Lega fs_236 Nusa Tenggara 2,3 73 APL 6,1 53 Sawidago-1 #1 hp_0367 Sulawesi 2,2 72 APL 6,1 54 Randangan-2 JicaPR_0718 Sulawesi 5,5 83 HPT 6,1 55 Noni JicaPR_1138 Nusa Tenggara 3,5 90 APL 6,1 56 Kamatang-2 JicaPR_1100 Nusa Tenggara 4,6 105 APL 6,0 57 Leke JicaPR_1185 Nusa Tenggara 1,8 97 APL 30 6,0 58 PLTM Bungin 2 fs_207 Sulawesi 4,9 62 HL 5,8 59 Waikudu JicaPR_1104 Nusa Tenggara 4,2 85 HPK & APL 5,8 60 Wai Ru JicaPR_1115 Nusa Tenggara 2,4 94 APL 5,8 61 PLTM Harunda fs_242 Nusa Tenggara 3,1 74 HPT & APL 5,7 62 Gamputa JicaPR_0858 Sulawesi 5,0 99 HPK 5,7 63 Palu-2A JicaPR_0845 Sulawesi 5,0 131 APL 5,7 64 Mata Alo-1 JicaPR_0806 Sulawesi 3,1 107 APL 5,7 65 Palame-2 JicaPR_1095 Nusa Tenggara 4,1 113 HPT & APL 30 5,7 PLTM Bongkasoa- 66 fs_160 Sulawesi 1,7 92 APL 5,7 Simpoyo 67 Buol-1 JicaPR_0850 Sulawesi 4,1 125 APL 5,6 68 Ngodama JicaPR_1236 Maluku 5,7 114 HPT 5,6 69 Wooi Besar-2 JicaPR_1250 Maluku 8,2 146 HP 5,6 70 Wai Racang JicaEX_0108 Nusa Tenggara 1,5 98 APL 5,5 71 PLTM Lobu fs_222 Sulawesi 3,5 93 HPT 5,5 72 Taramanu-1 JicaPR_1139 Nusa Tenggara 3,6 128 APL 5,5 73 Wajo-2 JicaPR_1128 Nusa Tenggara 0,9 221 APL 5 5,4 74 Nowa JicaPR_1114 Nusa Tenggara 1,2 175 HP & APL 10 5,4 75 Rita JicaPR_1107 Nusa Tenggara 2,5 165 APL 25 5,4 76 PLTM Pasui 2 fs_184 Sulawesi 1,7 114 APL 5,3 77 Halulai hp_0391 Sulawesi 2,2 89 HPT 5,3 78 Kamatang-1 JicaPR_1099 Nusa Tenggara 2,5 149 APL 30 5,3 79 Siwa JicaPR_0781 Sulawesi 1,8 116 APL 5,3 PLTM Benteng 80 fs_194 Sulawesi 1,3 111 APL 5,3 Malewang 81 Ilanga-1 JicaPR_0854 Sulawesi 5,5 134 HPT 5,3 82 Dondo-3 JicaPR_1126 Nusa Tenggara 1,9 205 APL 15 5,3 83 Maraja-3 JicaPR_0848 Sulawesi 1,2 165 HPT & APL 15 5,3 Annex V – List of most promising sites - Base strategy 2 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Installed Local LCOE Protected Weighted Project ID Island capacity Electrification - (USD/MWh) Area score (MW) Radius (km) 84 Lakalamba JicaPR_1101 Nusa Tenggara 1,2 126 HP 25 5,2 85 Kuala Kilo fs_220 Sulawesi 5,3 166 APL 5,2 86 Palame-1 JicaPR_1094 Nusa Tenggara 1,9 158 HPT & APL 20 5,2 87 PLTM Malua fs_188 Sulawesi 1,5 121 APL 5,2 88 Lamo-2 JicaPR_1233 Maluku 4,1 161 APL 5,0 89 Paddumpu hp_0311 Sulawesi 1,9 108 HPT & APL 5,0 90 Jajawi JicaPR_1230 Maluku 6,5 135 HL 4,9 91 Watumbaka JicaPR_1109 Nusa Tenggara 1,5 170 HP & APL 20 4,9 92 Batuputi JicaPR_0786 Sulawesi 2,0 145 APL 4,9 93 Ranoyapo-1 JicaPR_0867 Sulawesi 2,8 127 HP 4,8 94 Sawidago-3 hp_0394 Sulawesi 1,9 84 HL 4,8 95 PLTMH Eremerasa fs_181 Sulawesi 0,6 133 APL 4,8 96 Poigar-4 JicaPR_0866 Sulawesi 2,6 138 HP 4,6 97 Melolo-2 JicaPR_1111 Nusa Tenggara 2,0 167 HL 20 4,6 98 Ranu-2 JicaPR_1206 Maluku 5,5 146 HL 4,6 99 PLTM Kahaya fs_180 Sulawesi 2,2 106 HL & APL 4,6 100 Pastu Ra JicaPR_1247 Maluku 1,3 180 HL 15 4,5 101 Riorita hp_0401 Sulawesi 2,1 105 HL & APL 4,5 102 Nua JicaPR_1222 Maluku 4,0 161 HPK 4,5 103 Taramanu-2 JicaPR_1140 Nusa Tenggara 4,1 197 APL 4,5 104 Kapsali JicaPR_1141 Nusa Tenggara 1,6 160 HPT 30 4,5 105 PLTM Soru fs_237 Nusa Tenggara 0,7 155 APL 4,5 106 PLTM Wanokaka 2 fs_246 Nusa Tenggara 0,6 156 APL 4,4 107 Lariang-10 JicaPR_0840 Sulawesi 5,5 154 HL & HPT 4,4 108 Dondo-1 JicaPR_1124 Nusa Tenggara 1,0 164 APL 4,4 109 Melolo-1 JicaPR_1110 Nusa Tenggara 0,8 190 HL & APL 15 4,3 110 Paca JicaPR_1234 Maluku 0,5 239 HPK 10 4,3 111 Larana JicaPR_1191 Nusa Tenggara 0,6 168 APL 4,2 112 Irauri JicaPR_1189 Nusa Tenggara 3,1 78 HSA-W 4,2 113 PLTM Tirtanagaya fs_229 Sulawesi 2,1 160 HPT 4,2 114 Bajo JicaPR_0779 Sulawesi 1,2 181 APL 4,1 115 Taima JicaPR_0729 Sulawesi 1,6 188 APL 4,1 116 Mama JicaPR_1204 Maluku 1,8 161 HPT 4,1 117 Leman JicaPR_1208 Maluku 1,4 225 HPK 20 4,0 118 PLTM Dako fs_161 Sulawesi 0,4 180 APL 4,0 119 Toma-2 JicaPR_0754 Sulawesi 1,7 209 HL 20 3,8 120 Kambera-3 JicaPR_1105 Nusa Tenggara 2,5 244 APL 30 3,8 121 PLTM Bengkoli fs_168 Sulawesi 1,6 179 HPT & APL 3,8 122 Kadassa-2 JicaPR_1097 Nusa Tenggara 2,6 269 APL 25 3,7 123 PLTM Kadundung fs_202 Sulawesi 1,2 145 HL 3,7 124 Iwoimenda JicaPR_0764 Sulawesi 2,4 164 HL 3,7 125 PLTM Sinombulung fs_228 Sulawesi 3,0 204 HPT 3,6 126 Liocopa JicaPR_1224 Maluku 1,0 245 HP 20 3,6 127 PLTM Ponju fs_169 Sulawesi 0,8 177 HPT 3,6 Annex V – List of most promising sites - Base strategy 3 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Installed Local LCOE Protected Weighted Project ID Island capacity Electrification - (USD/MWh) Area score (MW) Radius (km) 128 Paguyaman-1 JicaPR_0715 Sulawesi 3,8 127 HSA-W 3,5 129 Kambera-1 JicaPR_1102 Nusa Tenggara 0,6 326 APL 15 3,5 130 Dumoga-1 JicaPR_0860 Sulawesi 3,4 126 HSA-W 3,5 131 Labu-2 JicaPR_0734 Sulawesi 0,9 223 APL 3,4 HL, HPT & 132 Pia JicaPR_1221 Maluku 3,5 197 3,3 HPK 133 Lamuk JicaPR_1106 Nusa Tenggara 0,8 234 HL & APL 20 3,3 134 Ili-1 JicaPR_1201 Maluku 4,8 220 HL & HPT 3,2 135 Wai Miha JicaPR_1251 Maluku 1,4 254 HP 25 3,2 136 Makariki hp_0216 Maluku 1,0 211 HPK 3,1 137 Awo JicaPR_0780 Sulawesi 0,8 193 HL 2,9 138 Kolori hp_0281 Sulawesi 0,8 132 HSA-W 2,8 139 Lasolo-2 JicaPR_0751 Sulawesi 2,4 418 HL 15 2,8 140 Mala JicaPR_1220 Maluku 2,4 247 HPT 2,8 141 Bayau-1 JicaPR_0856 Sulawesi 1,9 260 HPT 2,5 142 Sissa JicaPR_1121 Nusa Tenggara 1,4 286 APL 2,5 143 PLTM Pidung fs_174 Sulawesi 0,6 251 HPT 2,4 144 Lelipang hp_0297 Sulawesi 0,4 283 APL 2,3 145 Kalempang-3 JicaPR_0792 Sulawesi 0,4 288 APL 2,3 146 Dopi JicaPR_0747 Sulawesi 3,5 574 HPT 2,2 147 Malik JicaPR_0735 Sulawesi 0,3 350 APL 2,1 148 Lot JicaPR_1228 Maluku 0,2 497 APL 2,0 149 Kina JicaPR_1217 Maluku 1,2 324 HPT 1,7 150 Sumara JicaPR_0740 Sulawesi 1,3 209 HSA-W 1,7 HSA-W & 151 Ayoung JicaPR_0859 Sulawesi 1,7 230 1,5 APL 152 Toma-4 JicaPR_0756 Sulawesi 1,5 356 HL & HPK 1,3 153 Toma-3 JicaPR_0755 Sulawesi 0,6 889 HL 1,1 154 Ela JicaPR_1227 Maluku 0,2 556 HL 1,0 155 Bonehau hp_0448 Sulawesi 0,2 388 HL & APL 1,0 Annex V – List of most promising sites - Base strategy 4 ANNEX VI - LIST OF MOST PROMISING SITES - HYDROPOWER DEVELOPMENT STRATEGY SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT List of most promising sites - Hydropower development strategy Installed Local LCOE Protected Weighted Project ID Island capacity Electrification - (USD/MWh) Area score (MW) Radius (km) 1 Meseh-2 JicaPR_1134 Nusa Tenggara 11,9 67 APL 20 8,9 2 PLTM Sabuku fs_215 Sulawesi 11,2 99 APL 25 8,3 3 Lapai II hp_0221 Sulawesi 8,0 98 APL 10 8,3 4 Menu-2 JicaPR_1182 Nusa Tenggara 8,4 73 APL 20 8,1 5 PLTM Paun fs_203 Sulawesi 15,9 55 APL 8,0 6 Ria JicaPR_1129 Nusa Tenggara 8,7 72 APL 25 7,9 7 PLTM Rongkong 3 fs_206 Sulawesi 14,2 71 APL 7,8 8 PLTM Karangana I fs_210 Sulawesi 18,8 57 HPT & APL 7,7 9 PLTM Yaentu fs_165 Sulawesi 15,3 58 HPT 7,7 10 PLTM Sapalewa fs_192 Maluku 20,1 58 HPK 7,7 11 Rongkong hp_0436 Sulawesi 12,1 99 APL 7,6 12 PLTM Aralle fs_232 Sulawesi 14,9 73 HPT 7,6 13 Benain-1 JicaPR_1177 Nusa Tenggara 15,5 134 HP & APL 30 7,5 14 PLTM Masewo fs_223 Sulawesi 15,5 90 HPT 7,4 PLTM Maiting Hulu 15 fs_198 Sulawesi 9,0 57 APL 7,4 2 16 PLTM Ma'dong fs_195 Sulawesi 8,8 45 APL 7,4 17 PLTM Mapahi fs_213 Sulawesi 24,6 70 HL 7,3 18 PLTM Karangana II fs_211 Sulawesi 26,3 73 HL & HPT 7,3 19 PLTM Tabong fs_216 Sulawesi 13,9 137 APL 7,3 20 PLTA Tina fs_234 Maluku 10,1 116 HP 7,2 21 PLTM Tomoni fs_204 Sulawesi 9,3 50 HL & HP 7,1 22 Menu-1 JicaPR_1181 Nusa Tenggara 5,2 72 APL 10 7,1 23 Lariang-11 JicaPR_0841 Sulawesi 10,7 130 HPT 7,1 24 PLTM Sapaya fs_199 Sulawesi 8,1 48 APL 7,0 25 Kalada JicaPR_1093 Nusa Tenggara 7,3 91 APL 30 6,7 26 Laku JicaPR_1135 Nusa Tenggara 4,7 73 APL 15 6,5 27 Tuke JicaPR_1184 Nusa Tenggara 4,7 86 APL 15 6,4 28 PLTM Pamoseang fs_231 Sulawesi 7,9 83 HPT 6,4 29 Lake JicaPR_1131 Nusa Tenggara 5,7 93 HP & APL 20 6,3 30 Manasako JicaPR_1190 Nusa Tenggara 7,8 64 HL 6,3 31 Meseh-1 JicaPR_1133 Nusa Tenggara 3,4 80 APL 10 6,2 32 PLTM Batukede fs_193 Sulawesi 6,3 55 APL 6,1 33 Wooi Besar-2 JicaPR_1250 Maluku 8,2 146 HP 6,1 34 Wai Ranjang JicaPR_1116 Nusa Tenggara 2,6 88 APL 5 6,0 35 Ria Mboeli JicaPR_1130 Nusa Tenggara 3,8 89 APL 15 6,0 36 PLTM Siyuntoyo fs_227 Sulawesi 4,2 150 HPT 10 5,7 37 Rentelemo JicaPR_0811 Sulawesi 5,2 65 APL 5,5 38 Lawo Lambo JicaPR_1122 Nusa Tenggara 3,5 96 APL 20 5,4 39 PLTM Pono fs_163 Sulawesi 3,5 104 APL 20 5,4 40 Muke JicaPR_1183 Nusa Tenggara 3,1 124 APL 15 5,3 41 Tangkak-1 JicaPR_0793 Sulawesi 5,0 70 APL 5,3 Annex VI – List of most promising sites - Hydropower development strategy 1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 42 Kuala Tengah fs_221 Sulawesi 5,4 102 APL 5,3 43 Randangan-2 JicaPR_0718 Sulawesi 5,5 83 HPT 5,2 44 Bobo JicaPR_1136 Nusa Tenggara 2,0 123 APL 10 5,1 45 Mikuasi (PLN) hp_0447 Sulawesi 2,7 103 HL 10 5,1 46 Ngodama JicaPR_1236 Maluku 5,7 114 HPT 5,1 47 Jajawi JicaPR_1230 Maluku 6,5 135 HL 5,1 48 Buleleng hp_0456 Sulawesi 3,9 93 HPT & HPK 25 5,1 PLTM Ranowano 49 fs_171 Sulawesi 4,3 65 APL 5,0 Minahasa 50 Anail JicaPR_1188 Nusa Tenggara 4,6 96 APL 5,0 51 Palu-2A JicaPR_0845 Sulawesi 5,0 131 APL 4,9 52 Karendi-2 JicaPR_1092 Nusa Tenggara 2,3 110 HL & APL 10 4,9 53 PLTM Bungin 2 fs_207 Sulawesi 4,9 62 HL 4,9 54 Gamputa JicaPR_0858 Sulawesi 5,0 99 HPK 4,9 55 Kamatang-2 JicaPR_1100 Nusa Tenggara 4,6 105 APL 4,9 56 Ilanga-1 JicaPR_0854 Sulawesi 5,5 134 HPT 4,8 57 Kuala Kilo fs_220 Sulawesi 5,3 166 APL 4,7 58 Palame-2 JicaPR_1095 Nusa Tenggara 4,1 113 HPT & APL 30 4,7 59 PLTM Sampaga fs_162 Sulawesi 1,3 155 APL 8 4,6 60 Waikudu JicaPR_1104 Nusa Tenggara 4,2 85 HPK & APL 4,6 61 PLTM Kindang 2 fs_205 Sulawesi 3,5 75 APL 4,5 62 Ranu-2 JicaPR_1206 Maluku 5,5 146 HL 4,5 63 Buol-1 JicaPR_0850 Sulawesi 4,1 125 APL 4,4 64 Lariang-10 JicaPR_0840 Sulawesi 5,5 154 HL & HPT 4,4 65 Noni JicaPR_1138 Nusa Tenggara 3,5 90 APL 4,4 66 PLTM Tincep 3 fs_173 Sulawesi 3,2 73 APL 4,4 PLTM 67 fs_208 Sulawesi 2,9 70 APL 4,3 Bontomantene 68 PLTM Lobu fs_222 Sulawesi 3,5 93 HPT 4,2 69 Taramanu-1 JicaPR_1139 Nusa Tenggara 3,6 128 APL 4,2 70 Lamo-2 JicaPR_1233 Maluku 4,1 161 APL 4,1 71 Mata Alo-1 JicaPR_0806 Sulawesi 3,1 107 APL 4,1 72 Dondo-3 JicaPR_1126 Nusa Tenggara 1,9 205 APL 15 4,1 73 PLTM Harunda fs_242 Nusa Tenggara 3,1 74 HPT & APL 4,1 74 Wajo-2 JicaPR_1128 Nusa Tenggara 0,9 221 APL 5 4,1 75 Rita JicaPR_1107 Nusa Tenggara 2,5 165 APL 25 4,0 76 Nowa JicaPR_1114 Nusa Tenggara 1,2 175 HP & APL 10 4,0 77 PLTM Wae Lega fs_236 Nusa Tenggara 2,3 73 APL 4,0 78 Leke JicaPR_1185 Nusa Tenggara 1,8 97 APL 30 3,9 79 Sawidago-1 #1 hp_0367 Sulawesi 2,2 72 APL 3,9 80 Nua JicaPR_1222 Maluku 4,0 161 HPK 3,9 81 Taramanu-2 JicaPR_1140 Nusa Tenggara 4,1 197 APL 3,9 82 Kamatang-1 JicaPR_1099 Nusa Tenggara 2,5 149 APL 30 3,9 83 Palame-1 JicaPR_1094 Nusa Tenggara 1,9 158 HPT & APL 20 3,9 84 Wai Ru JicaPR_1115 Nusa Tenggara 2,4 94 APL 3,8 85 Maraja-3 JicaPR_0848 Sulawesi 1,2 165 HPT & APL 15 3,8 86 Melolo-2 JicaPR_1111 Nusa Tenggara 2,0 167 HL 20 3,6 87 Watumbaka JicaPR_1109 Nusa Tenggara 1,5 170 HP & APL 20 3,6 Annex VI – List of most promising sites - Hydropower development strategy 2 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 88 Ranoyapo-1 JicaPR_0867 Sulawesi 2,8 127 HP 3,6 89 Ili-1 JicaPR_1201 Maluku 4,8 220 HL & HPT 3,5 90 Halulai hp_0391 Sulawesi 2,2 89 HPT 3,5 PLTM Bongkasoa- 91 fs_160 Sulawesi 1,7 92 APL 3,5 Simpoyo 92 Pastu Ra JicaPR_1247 Maluku 1,3 180 HL 15 3,5 93 Lakalamba JicaPR_1101 Nusa Tenggara 1,2 126 HP 25 3,4 94 Siwa JicaPR_0781 Sulawesi 1,8 116 APL 3,4 95 Wai Racang JicaEX_0108 Nusa Tenggara 1,5 98 APL 3,4 96 PLTM Pasui 2 fs_184 Sulawesi 1,7 114 APL 3,4 97 Poigar-4 JicaPR_0866 Sulawesi 2,6 138 HP 3,4 98 Irauri JicaPR_1189 Nusa Tenggara 3,1 78 HSA-W 3,3 99 Paguyaman-1 JicaPR_0715 Sulawesi 3,8 127 HSA-W 3,3 100 Kadassa-2 JicaPR_1097 Nusa Tenggara 2,6 269 APL 25 3,3 101 Paddumpu hp_0311 Sulawesi 1,9 108 HPT & APL 3,2 102 Batuputi JicaPR_0786 Sulawesi 2,0 145 APL 3,2 PLTM Benteng 103 fs_194 Sulawesi 1,3 111 APL 3,2 Malewang 104 PLTM Malua fs_188 Sulawesi 1,5 121 APL 3,2 105 PLTM Kahaya fs_180 Sulawesi 2,2 106 HL & APL 3,2 106 Paca JicaPR_1234 Maluku 0,5 239 HPK 10 3,2 107 Sawidago-3 hp_0394 Sulawesi 1,9 84 HL 3,2 108 Melolo-1 JicaPR_1110 Nusa Tenggara 0,8 190 HL & APL 15 3,1 109 Riorita hp_0401 Sulawesi 2,1 105 HL & APL 3,1 110 Kambera-3 JicaPR_1105 Nusa Tenggara 2,5 244 APL 30 3,1 111 Toma-2 JicaPR_0754 Sulawesi 1,7 209 HL 20 3,1 112 Dumoga-1 JicaPR_0860 Sulawesi 3,4 126 HSA-W 3,1 113 Leman JicaPR_1208 Maluku 1,4 225 HPK 20 3,1 114 Kapsali JicaPR_1141 Nusa Tenggara 1,6 160 HPT 30 3,1 HL, HPT & 115 Pia JicaPR_1221 Maluku 3,5 197 3,1 HPK 116 Lasolo-2 JicaPR_0751 Sulawesi 2,4 418 HL 15 3,0 117 PLTM Sinombulung fs_228 Sulawesi 3,0 204 HPT 3,0 118 PLTM Tirtanagaya fs_229 Sulawesi 2,1 160 HPT 2,9 119 Iwoimenda JicaPR_0764 Sulawesi 2,4 164 HL 2,8 120 Mama JicaPR_1204 Maluku 1,8 161 HPT 2,8 121 Liocopa JicaPR_1224 Maluku 1,0 245 HP 20 2,7 122 Taima JicaPR_0729 Sulawesi 1,6 188 APL 2,7 123 Kambera-1 JicaPR_1102 Nusa Tenggara 0,6 326 APL 15 2,7 124 PLTMH Eremerasa fs_181 Sulawesi 0,6 133 APL 2,6 125 Dondo-1 JicaPR_1124 Nusa Tenggara 1,0 164 APL 2,6 126 Bajo JicaPR_0779 Sulawesi 1,2 181 APL 2,6 127 Wai Miha JicaPR_1251 Maluku 1,4 254 HP 25 2,5 128 PLTM Bengkoli fs_168 Sulawesi 1,6 179 HPT & APL 2,5 129 PLTM Soru fs_237 Nusa Tenggara 0,7 155 APL 2,5 130 Dopi JicaPR_0747 Sulawesi 3,5 574 HPT 2,5 131 Lamuk JicaPR_1106 Nusa Tenggara 0,8 234 HL & APL 20 2,5 132 PLTM Wanokaka 2 fs_246 Nusa Tenggara 0,6 156 APL 2,5 Annex VI – List of most promising sites - Hydropower development strategy 3 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT 133 Mala JicaPR_1220 Maluku 2,4 247 HPT 2,4 134 Larana JicaPR_1191 Nusa Tenggara 0,6 168 APL 2,4 135 PLTM Kadundung fs_202 Sulawesi 1,2 145 HL 2,3 136 PLTM Dako fs_161 Sulawesi 0,4 180 APL 2,2 137 PLTM Ponju fs_169 Sulawesi 0,8 177 HPT 2,1 138 Labu-2 JicaPR_0734 Sulawesi 0,9 223 APL 2,1 139 Bayau-1 JicaPR_0856 Sulawesi 1,9 260 HPT 2,0 140 Makariki hp_0216 Maluku 1,0 211 HPK 2,0 141 Sissa JicaPR_1121 Nusa Tenggara 1,4 286 APL 1,8 142 Awo JicaPR_0780 Sulawesi 0,8 193 HL 1,7 143 Kolori hp_0281 Sulawesi 0,8 132 HSA-W 1,7 144 PLTM Pidung fs_174 Sulawesi 0,6 251 HPT 1,4 HSA-W & 145 Ayoung JicaPR_0859 Sulawesi 1,7 230 1,4 APL 146 Sumara JicaPR_0740 Sulawesi 1,3 209 HSA-W 1,4 147 Kina JicaPR_1217 Maluku 1,2 324 HPT 1,3 148 Lelipang hp_0297 Sulawesi 0,4 283 APL 1,3 149 Kalempang-3 JicaPR_0792 Sulawesi 0,4 288 APL 1,3 150 Toma-4 JicaPR_0756 Sulawesi 1,5 356 HL & HPK 1,3 151 Malik JicaPR_0735 Sulawesi 0,3 350 APL 1,2 152 Lot JicaPR_1228 Maluku 0,2 497 APL 1,1 153 Toma-3 JicaPR_0755 Sulawesi 0,6 889 HL 0,8 154 Ela JicaPR_1227 Maluku 0,2 556 HL 0,6 155 Bonehau hp_0448 Sulawesi 0,2 388 HL & APL 0,6 Annex VI – List of most promising sites - Hydropower development strategy 4 ANNEX VII - LIST OF MOST PROMISING SITES - ENVIRONMENTAL IMPACT STRATEGY SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT List of most promising sites - Environmental impact strategy Installed Local LCOE Protected Weighted Project ID Island capacity Electrification - (USD/MWh) Area score (MW) Radius (km) 1 Lapai II hp_0221 Sulawesi 8,0 98 APL 10 9,1 2 Menu-1 JicaPR_1181 Nusa Tenggara 5,2 72 APL 10 9,0 3 Wai Ranjang JicaPR_1116 Nusa Tenggara 2,6 88 APL 5 9,0 4 Meseh-2 JicaPR_1134 Nusa Tenggara 11,9 67 APL 20 8,9 5 Meseh-1 JicaPR_1133 Nusa Tenggara 3,4 80 APL 10 8,8 6 Menu-2 JicaPR_1182 Nusa Tenggara 8,4 73 APL 20 8,7 7 Laku JicaPR_1135 Nusa Tenggara 4,7 73 APL 15 8,6 8 Tuke JicaPR_1184 Nusa Tenggara 4,7 86 APL 15 8,5 9 Ria Mboeli JicaPR_1130 Nusa Tenggara 3,8 89 APL 15 8,4 10 Ria JicaPR_1129 Nusa Tenggara 8,7 72 APL 25 8,4 11 PLTM Sabuku fs_215 Sulawesi 11,2 99 APL 25 8,3 12 Bobo JicaPR_1136 Nusa Tenggara 2,0 123 APL 10 8,3 13 PLTM Sampaga fs_162 Sulawesi 1,3 155 APL 8 8,1 14 Muke JicaPR_1183 Nusa Tenggara 3,1 124 APL 15 8,1 15 Lawo Lambo JicaPR_1122 Nusa Tenggara 3,5 96 APL 20 8,0 16 PLTM Paun fs_203 Sulawesi 15,9 55 APL 8,0 17 PLTM Pono fs_163 Sulawesi 3,5 104 APL 20 8,0 18 PLTM Ma'dong fs_195 Sulawesi 8,8 45 APL 7,9 PLTM Maiting 19 fs_198 Sulawesi 9,0 57 APL 7,8 Hulu 2 20 PLTM Rongkong 3 fs_206 Sulawesi 14,2 71 APL 7,8 21 PLTM Sapaya fs_199 Sulawesi 8,1 48 APL 7,8 22 Kalada JicaPR_1093 Nusa Tenggara 7,3 91 APL 30 7,8 23 Wajo-2 JicaPR_1128 Nusa Tenggara 0,9 221 APL 5 7,7 24 Rongkong hp_0436 Sulawesi 12,1 99 APL 7,6 25 PLTM Batukede fs_193 Sulawesi 6,3 55 APL 7,6 26 Rentelemo JicaPR_0811 Sulawesi 5,2 65 APL 7,4 27 Tangkak-1 JicaPR_0793 Sulawesi 5,0 70 APL 7,3 28 Dondo-3 JicaPR_1126 Nusa Tenggara 1,9 205 APL 15 7,3 PLTM Ranowano 29 fs_171 Sulawesi 4,3 65 APL 7,3 Minahasa 30 PLTM Tabong fs_216 Sulawesi 13,9 137 APL 7,3 31 Leke JicaPR_1185 Nusa Tenggara 1,8 97 APL 30 7,2 32 PLTM Kindang 2 fs_205 Sulawesi 3,5 75 APL 7,1 33 PLTM Tincep 3 fs_173 Sulawesi 3,2 73 APL 7,1 PLTM 34 fs_208 Sulawesi 2,9 70 APL 7,1 Bontomantene 35 Kuala Tengah fs_221 Sulawesi 5,4 102 APL 7,1 36 Anail JicaPR_1188 Nusa Tenggara 4,6 96 APL 7,1 37 PLTM Wae Lega fs_236 Nusa Tenggara 2,3 73 APL 7,1 38 PLTM Siyuntoyo fs_227 Sulawesi 4,2 150 HPT 10 7,0 39 Rita JicaPR_1107 Nusa Tenggara 2,5 165 APL 25 7,0 40 Sawidago-1 #1 hp_0367 Sulawesi 2,2 72 APL 7,0 Annex VII – List of most promising sites - Environmental impact strategy 1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Installed Local LCOE Protected Weighted Project ID Island capacity Electrification - (USD/MWh) Area score (MW) Radius (km) 41 Noni JicaPR_1138 Nusa Tenggara 3,5 90 APL 7,0 42 Kamatang-2 JicaPR_1100 Nusa Tenggara 4,6 105 APL 7,0 43 Lake JicaPR_1131 Nusa Tenggara 5,7 93 HP & APL 20 7,0 44 Wai Ru JicaPR_1115 Nusa Tenggara 2,4 94 APL 6,9 45 Kamatang-1 JicaPR_1099 Nusa Tenggara 2,5 149 APL 30 6,9 46 Palu-2A JicaPR_0845 Sulawesi 5,0 131 APL 6,9 47 Mata Alo-1 JicaPR_0806 Sulawesi 3,1 107 APL 6,9 PLTM Bongkasoa- 48 fs_160 Sulawesi 1,7 92 APL 6,8 Simpoyo 49 Buol-1 JicaPR_0850 Sulawesi 4,1 125 APL 6,8 50 Wai Racang JicaEX_0108 Nusa Tenggara 1,5 98 APL 6,8 51 Taramanu-1 JicaPR_1139 Nusa Tenggara 3,6 128 APL 6,7 52 PLTM Karangana I fs_210 Sulawesi 18,8 57 HPT & APL 6,7 53 PLTM Yaentu fs_165 Sulawesi 15,3 58 HPT 6,7 54 PLTM Sapalewa fs_192 Maluku 20,1 58 HPK 6,7 55 PLTM Pasui 2 fs_184 Sulawesi 1,7 114 APL 6,7 56 Siwa JicaPR_0781 Sulawesi 1,8 116 APL 6,7 PLTM Benteng 57 fs_194 Sulawesi 1,3 111 APL 6,6 Malewang 58 Kuala Kilo fs_220 Sulawesi 5,3 166 APL 6,6 59 PLTM Malua fs_188 Sulawesi 1,5 121 APL 6,6 60 PLTM Aralle fs_232 Sulawesi 14,9 73 HPT 6,6 61 Nowa JicaPR_1114 Nusa Tenggara 1,2 175 HP & APL 10 6,5 62 Lamo-2 JicaPR_1233 Maluku 4,1 161 APL 6,5 63 Buleleng hp_0456 Sulawesi 3,9 93 HPT & HPK 25 6,5 64 Benain-1 JicaPR_1177 Nusa Tenggara 15,5 134 HP & APL 30 6,5 65 Batuputi JicaPR_0786 Sulawesi 2,0 145 APL 6,4 66 PLTM Masewo fs_223 Sulawesi 15,5 90 HPT 6,4 67 Kambera-1 JicaPR_1102 Nusa Tenggara 0,6 326 APL 15 6,4 68 PLTMH Eremerasa fs_181 Sulawesi 0,6 133 APL 6,4 69 Maraja-3 JicaPR_0848 Sulawesi 1,2 165 HPT & APL 15 6,3 70 PLTM Pamoseang fs_231 Sulawesi 7,9 83 HPT 6,3 71 Kadassa-2 JicaPR_1097 Nusa Tenggara 2,6 269 APL 25 6,2 72 Taramanu-2 JicaPR_1140 Nusa Tenggara 4,1 197 APL 6,2 73 PLTM Soru fs_237 Nusa Tenggara 0,7 155 APL 6,2 PLTM Wanokaka 74 fs_246 Nusa Tenggara 0,6 156 APL 6,2 2 75 PLTA Tina fs_234 Maluku 10,1 116 HP 6,2 76 Dondo-1 JicaPR_1124 Nusa Tenggara 1,0 164 APL 6,2 77 Palame-1 JicaPR_1094 Nusa Tenggara 1,9 158 HPT & APL 20 6,1 78 Larana JicaPR_1191 Nusa Tenggara 0,6 168 APL 6,1 79 Lariang-11 JicaPR_0841 Sulawesi 10,7 130 HPT 6,1 80 Kambera-3 JicaPR_1105 Nusa Tenggara 2,5 244 APL 30 6,1 81 Bajo JicaPR_0779 Sulawesi 1,2 181 APL 6,1 82 Taima JicaPR_0729 Sulawesi 1,6 188 APL 6,1 Annex VII – List of most promising sites - Environmental impact strategy 2 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Installed Local LCOE Protected Weighted Project ID Island capacity Electrification - (USD/MWh) Area score (MW) Radius (km) 83 Palame-2 JicaPR_1095 Nusa Tenggara 4,1 113 HPT & APL 30 6,1 84 Randangan-2 JicaPR_0718 Sulawesi 5,5 83 HPT 6,0 85 Mikuasi (PLN) hp_0447 Sulawesi 2,7 103 HL 10 6,0 86 PLTM Dako fs_161 Sulawesi 0,4 180 APL 6,0 87 Watumbaka JicaPR_1109 Nusa Tenggara 1,5 170 HP & APL 20 6,0 88 Lakalamba JicaPR_1101 Nusa Tenggara 1,2 126 HP 25 6,0 89 Paca JicaPR_1234 Maluku 0,5 239 HPK 10 6,0 90 Karendi-2 JicaPR_1092 Nusa Tenggara 2,3 110 HL & APL 10 5,9 91 Waikudu JicaPR_1104 Nusa Tenggara 4,2 85 HPK & APL 5,9 92 PLTM Harunda fs_242 Nusa Tenggara 3,1 74 HPT & APL 5,9 93 Gamputa JicaPR_0858 Sulawesi 5,0 99 HPK 5,9 94 Ngodama JicaPR_1236 Maluku 5,7 114 HPT 5,8 95 Wooi Besar-2 JicaPR_1250 Maluku 8,2 146 HP 5,8 96 PLTM Lobu fs_222 Sulawesi 3,5 93 HPT 5,8 97 Labu-2 JicaPR_0734 Sulawesi 0,9 223 APL 5,7 98 Halulai hp_0391 Sulawesi 2,2 89 HPT 5,7 99 Ilanga-1 JicaPR_0854 Sulawesi 5,5 134 HPT 5,6 100 Leman JicaPR_1208 Maluku 1,4 225 HPK 20 5,5 101 Paddumpu hp_0311 Sulawesi 1,9 108 HPT & APL 5,5 102 Kapsali JicaPR_1141 Nusa Tenggara 1,6 160 HPT 30 5,4 103 PLTM Tomoni fs_204 Sulawesi 9,3 50 HL & HP 5,4 104 Ranoyapo-1 JicaPR_0867 Sulawesi 2,8 127 HP 5,4 105 PLTM Mapahi fs_213 Sulawesi 24,6 70 HL 5,3 106 Liocopa JicaPR_1224 Maluku 1,0 245 HP 20 5,3 PLTM Karangana 107 fs_211 Sulawesi 26,3 73 HL & HPT 5,3 II 108 Poigar-4 JicaPR_0866 Sulawesi 2,6 138 HP 5,3 109 Nua JicaPR_1222 Maluku 4,0 161 HPK 5,3 110 Sissa JicaPR_1121 Nusa Tenggara 1,4 286 APL 5,3 111 Lelipang hp_0297 Sulawesi 0,4 283 APL 5,2 112 Manasako JicaPR_1190 Nusa Tenggara 7,8 64 HL 5,2 113 Kalempang-3 JicaPR_0792 Sulawesi 0,4 288 APL 5,1 114 PLTM Tirtanagaya fs_229 Sulawesi 2,1 160 HPT 5,1 115 Mama JicaPR_1204 Maluku 1,8 161 HPT 5,0 116 Malik JicaPR_0735 Sulawesi 0,3 350 APL 5,0 117 Lot JicaPR_1228 Maluku 0,2 497 APL 5,0 118 Wai Miha JicaPR_1251 Maluku 1,4 254 HP 25 5,0 119 Pastu Ra JicaPR_1247 Maluku 1,3 180 HL 15 5,0 120 PLTM Bungin 2 fs_207 Sulawesi 4,9 62 HL 4,9 121 PLTM Bengkoli fs_168 Sulawesi 1,6 179 HPT & APL 4,9 122 Melolo-1 JicaPR_1110 Nusa Tenggara 0,8 190 HL & APL 15 4,8 PLTM 123 fs_228 Sulawesi 3,0 204 HPT 4,8 Sinombulung 124 PLTM Ponju fs_169 Sulawesi 0,8 177 HPT 4,8 125 Melolo-2 JicaPR_1111 Nusa Tenggara 2,0 167 HL 20 4,8 Annex VII – List of most promising sites - Environmental impact strategy 3 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Installed Local LCOE Protected Weighted Project ID Island capacity Electrification - (USD/MWh) Area score (MW) Radius (km) 126 Makariki hp_0216 Maluku 1,0 211 HPK 4,6 127 Jajawi JicaPR_1230 Maluku 6,5 135 HL 4,5 128 Toma-2 JicaPR_0754 Sulawesi 1,7 209 HL 20 4,4 129 Sawidago-3 hp_0394 Sulawesi 1,9 84 HL 4,4 130 Mala JicaPR_1220 Maluku 2,4 247 HPT 4,4 131 Ranu-2 JicaPR_1206 Maluku 5,5 146 HL 4,3 132 PLTM Kahaya fs_180 Sulawesi 2,2 106 HL & APL 4,3 133 Riorita hp_0401 Sulawesi 2,1 105 HL & APL 4,3 134 Bayau-1 JicaPR_0856 Sulawesi 1,9 260 HPT 4,3 135 Lariang-10 JicaPR_0840 Sulawesi 5,5 154 HL & HPT 4,2 136 PLTM Pidung fs_174 Sulawesi 0,6 251 HPT 4,2 137 Lamuk JicaPR_1106 Nusa Tenggara 0,8 234 HL & APL 20 4,2 138 Dopi JicaPR_0747 Sulawesi 3,5 574 HPT 4,1 139 Lasolo-2 JicaPR_0751 Sulawesi 2,4 418 HL 15 4,1 140 Kina JicaPR_1217 Maluku 1,2 324 HPT 3,9 141 PLTM Kadundung fs_202 Sulawesi 1,2 145 HL 3,9 142 Iwoimenda JicaPR_0764 Sulawesi 2,4 164 HL 3,8 HL, HPT & 143 Pia JicaPR_1221 Maluku 3,5 197 3,7 HPK 144 Ili-1 JicaPR_1201 Maluku 4,8 220 HL & HPT 3,6 145 Awo JicaPR_0780 Sulawesi 0,8 193 HL 3,4 146 Toma-4 JicaPR_0756 Sulawesi 1,5 356 HL & HPK 2,7 147 Toma-3 JicaPR_0755 Sulawesi 0,6 889 HL 2,6 148 Ela JicaPR_1227 Maluku 0,2 556 HL 2,5 149 Bonehau hp_0448 Sulawesi 0,2 388 HL & APL 2,5 150 Irauri JicaPR_1189 Nusa Tenggara 3,1 78 HSA-W 2,1 151 Paguyaman-1 JicaPR_0715 Sulawesi 3,8 127 HSA-W 1,8 152 Dumoga-1 JicaPR_0860 Sulawesi 3,4 126 HSA-W 1,7 153 Kolori hp_0281 Sulawesi 0,8 132 HSA-W 1,4 154 Sumara JicaPR_0740 Sulawesi 1,3 209 HSA-W 0,9 HSA-W & 155 Ayoung JicaPR_0859 Sulawesi 1,7 230 0,7 APL Annex VII – List of most promising sites - Environmental impact strategy 4 ANNEX VIII - LIST OF MOST PROMISING SITES – RURAL ELECTRIFICATION STRATEGY SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT List of most promising sites – Rural Electrification strategy Installed Local LCOE Protected Weighted Project ID Island capacity Electrification - (USD/MWh) Area score (MW) Radius (km) 1 Wai Ranjang JicaPR_1116 Nusa Tenggara 2,6 88 APL 5 8,8 2 Menu-1 JicaPR_1181 Nusa Tenggara 5,2 72 APL 10 8,5 3 Lapai II hp_0221 Sulawesi 8,0 98 APL 10 8,4 4 Meseh-1 JicaPR_1133 Nusa Tenggara 3,4 80 APL 10 8,2 5 Laku JicaPR_1135 Nusa Tenggara 4,7 73 APL 15 7,6 6 Bobo JicaPR_1136 Nusa Tenggara 2,0 123 APL 10 7,5 7 PLTM Sampaga fs_162 Sulawesi 1,3 155 APL 8 7,5 8 Tuke JicaPR_1184 Nusa Tenggara 4,7 86 APL 15 7,4 9 Meseh-2 JicaPR_1134 Nusa Tenggara 11,9 67 APL 20 7,4 10 Mikuasi (PLN) hp_0447 Sulawesi 2,7 103 HL 10 7,3 11 Ria Mboeli JicaPR_1130 Nusa Tenggara 3,8 89 APL 15 7,3 12 Karendi-2 JicaPR_1092 Nusa Tenggara 2,3 110 HL & APL 10 7,2 13 PLTM Siyuntoyo fs_227 Sulawesi 4,2 150 HPT 10 7,2 14 Menu-2 JicaPR_1182 Nusa Tenggara 8,4 73 APL 20 7,2 15 Wajo-2 JicaPR_1128 Nusa Tenggara 0,9 221 APL 5 7,0 16 Muke JicaPR_1183 Nusa Tenggara 3,1 124 APL 15 6,8 17 Nowa JicaPR_1114 Nusa Tenggara 1,2 175 HP & APL 10 6,6 18 Lake JicaPR_1131 Nusa Tenggara 5,7 93 HP & APL 20 6,4 19 Ria JicaPR_1129 Nusa Tenggara 8,7 72 APL 25 6,4 20 Lawo Lambo JicaPR_1122 Nusa Tenggara 3,5 96 APL 20 6,4 21 PLTM Pono fs_163 Sulawesi 3,5 104 APL 20 6,3 22 PLTM Sabuku fs_215 Sulawesi 11,2 99 APL 25 6,2 23 Maraja-3 JicaPR_0848 Sulawesi 1,2 165 HPT & APL 15 5,9 24 Paca JicaPR_1234 Maluku 0,5 239 HPK 10 5,7 25 Dondo-3 JicaPR_1126 Nusa Tenggara 1,9 205 APL 15 5,7 26 Pastu Ra JicaPR_1247 Maluku 1,3 180 HL 15 5,5 27 Buleleng hp_0456 Sulawesi 3,9 93 HPT & HPK 25 5,4 28 Melolo-1 JicaPR_1110 Nusa Tenggara 0,8 190 HL & APL 15 5,3 29 Palame-1 JicaPR_1094 Nusa Tenggara 1,9 158 HPT & APL 20 5,2 30 Kalada JicaPR_1093 Nusa Tenggara 7,3 91 APL 30 5,2 31 Watumbaka JicaPR_1109 Nusa Tenggara 1,5 170 HP & APL 20 5,1 32 PLTM Paun fs_203 Sulawesi 15,9 55 APL 4,9 33 Melolo-2 JicaPR_1111 Nusa Tenggara 2,0 167 HL 20 4,9 34 PLTM Ma'dong fs_195 Sulawesi 8,8 45 APL 4,9 PLTM Maiting 35 fs_198 Sulawesi 9,0 57 APL 4,8 Hulu 2 36 PLTM Sapaya fs_199 Sulawesi 8,1 48 APL 4,8 37 Lakalamba JicaPR_1101 Nusa Tenggara 1,2 126 HP 25 4,8 38 Benain-1 JicaPR_1177 Nusa Tenggara 15,5 134 HP & APL 30 4,7 39 PLTM Rongkong 3 fs_206 Sulawesi 14,2 71 APL 4,7 Annex VIII – List of most promising sites – Rural Electrification strategy 1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Installed Local LCOE Protected Weighted Project ID Island capacity Electrification - (USD/MWh) Area score (MW) Radius (km) 40 PLTM Karangana I fs_210 Sulawesi 18,8 57 HPT & APL 4,7 41 Rita JicaPR_1107 Nusa Tenggara 2,5 165 APL 25 4,7 42 PLTM Yaentu fs_165 Sulawesi 15,3 58 HPT 4,7 43 PLTM Sapalewa fs_192 Maluku 20,1 58 HPK 4,7 44 Leke JicaPR_1185 Nusa Tenggara 1,8 97 APL 30 4,6 45 PLTM Batukede fs_193 Sulawesi 6,3 55 APL 4,6 46 PLTM Aralle fs_232 Sulawesi 14,9 73 HPT 4,5 47 Kambera-1 JicaPR_1102 Nusa Tenggara 0,6 326 APL 15 4,5 48 PLTM Tomoni fs_204 Sulawesi 9,3 50 HL & HP 4,4 49 Rongkong hp_0436 Sulawesi 12,1 99 APL 4,4 50 Palame-2 JicaPR_1095 Nusa Tenggara 4,1 113 HPT & APL 30 4,4 51 Leman JicaPR_1208 Maluku 1,4 225 HPK 20 4,4 52 Toma-2 JicaPR_0754 Sulawesi 1,7 209 HL 20 4,4 53 Rentelemo JicaPR_0811 Sulawesi 5,2 65 APL 4,3 54 PLTM Masewo fs_223 Sulawesi 15,5 90 HPT 4,3 55 PLTM Mapahi fs_213 Sulawesi 24,6 70 HL 4,3 56 Tangkak-1 JicaPR_0793 Sulawesi 5,0 70 APL 4,3 PLTM Ranowano 57 fs_171 Sulawesi 4,3 65 APL 4,2 Minahasa PLTM Karangana 58 fs_211 Sulawesi 26,3 73 HL & HPT 4,2 II 59 Lasolo-2 JicaPR_0751 Sulawesi 2,4 418 HL 15 4,1 60 PLTM Pamoseang fs_231 Sulawesi 7,9 83 HPT 4,1 61 Liocopa JicaPR_1224 Maluku 1,0 245 HP 20 4,1 62 Manasako JicaPR_1190 Nusa Tenggara 7,8 64 HL 4,1 63 Kamatang-1 JicaPR_1099 Nusa Tenggara 2,5 149 APL 30 4,1 64 PLTM Kindang 2 fs_205 Sulawesi 3,5 75 APL 4,0 PLTM 65 fs_208 Sulawesi 2,9 70 APL 4,0 Bontomantene 66 PLTM Tincep 3 fs_173 Sulawesi 3,2 73 APL 4,0 67 Lamuk JicaPR_1106 Nusa Tenggara 0,8 234 HL & APL 20 4,0 68 PLTM Wae Lega fs_236 Nusa Tenggara 2,3 73 APL 4,0 69 PLTM Tabong fs_216 Sulawesi 13,9 137 APL 4,0 70 PLTA Tina fs_234 Maluku 10,1 116 HP 4,0 71 Sawidago-1 #1 hp_0367 Sulawesi 2,2 72 APL 4,0 72 Anail JicaPR_1188 Nusa Tenggara 4,6 96 APL 3,9 73 Kuala Tengah fs_221 Sulawesi 5,4 102 APL 3,9 74 Randangan-2 JicaPR_0718 Sulawesi 5,5 83 HPT 3,9 75 Noni JicaPR_1138 Nusa Tenggara 3,5 90 APL 3,9 76 PLTM Bungin 2 fs_207 Sulawesi 4,9 62 HL 3,9 77 Kamatang-2 JicaPR_1100 Nusa Tenggara 4,6 105 APL 3,8 78 Lariang-11 JicaPR_0841 Sulawesi 10,7 130 HPT 3,8 79 PLTM Harunda fs_242 Nusa Tenggara 3,1 74 HPT & APL 3,8 Annex VIII – List of most promising sites – Rural Electrification strategy 2 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Installed Local LCOE Protected Weighted Project ID Island capacity Electrification - (USD/MWh) Area score (MW) Radius (km) 80 Waikudu JicaPR_1104 Nusa Tenggara 4,2 85 HPK & APL 3,8 81 Wai Ru JicaPR_1115 Nusa Tenggara 2,4 94 APL 3,7 PLTM Bongkasoa- 82 fs_160 Sulawesi 1,7 92 APL 3,7 Simpoyo 83 Gamputa JicaPR_0858 Sulawesi 5,0 99 HPK 3,7 84 Mata Alo-1 JicaPR_0806 Sulawesi 3,1 107 APL 3,6 85 Kapsali JicaPR_1141 Nusa Tenggara 1,6 160 HPT 30 3,6 86 PLTM Lobu fs_222 Sulawesi 3,5 93 HPT 3,6 87 Wai Racang JicaEX_0108 Nusa Tenggara 1,5 98 APL 3,6 88 Ngodama JicaPR_1236 Maluku 5,7 114 HPT 3,6 89 Palu-2A JicaPR_0845 Sulawesi 5,0 131 APL 3,5 90 Buol-1 JicaPR_0850 Sulawesi 4,1 125 APL 3,5 91 Halulai hp_0391 Sulawesi 2,2 89 HPT 3,5 92 Kadassa-2 JicaPR_1097 Nusa Tenggara 2,6 269 APL 25 3,4 93 Taramanu-1 JicaPR_1139 Nusa Tenggara 3,6 128 APL 3,4 94 Wooi Besar-2 JicaPR_1250 Maluku 8,2 146 HP 3,4 95 PLTM Pasui 2 fs_184 Sulawesi 1,7 114 APL 3,4 PLTM Benteng 96 fs_194 Sulawesi 1,3 111 APL 3,4 Malewang 97 Siwa JicaPR_0781 Sulawesi 1,8 116 APL 3,4 98 Ilanga-1 JicaPR_0854 Sulawesi 5,5 134 HPT 3,3 99 PLTM Malua fs_188 Sulawesi 1,5 121 APL 3,3 100 Sawidago-3 hp_0394 Sulawesi 1,9 84 HL 3,3 101 Paddumpu hp_0311 Sulawesi 1,9 108 HPT & APL 3,2 102 Wai Miha JicaPR_1251 Maluku 1,4 254 HP 25 3,2 103 Jajawi JicaPR_1230 Maluku 6,5 135 HL 3,1 104 Kuala Kilo fs_220 Sulawesi 5,3 166 APL 3,1 105 Ranoyapo-1 JicaPR_0867 Sulawesi 2,8 127 HP 3,1 106 Lamo-2 JicaPR_1233 Maluku 4,1 161 APL 3,1 107 PLTMH Eremerasa fs_181 Sulawesi 0,6 133 APL 3,1 108 Batuputi JicaPR_0786 Sulawesi 2,0 145 APL 3,1 109 PLTM Kahaya fs_180 Sulawesi 2,2 106 HL & APL 3,1 110 Riorita hp_0401 Sulawesi 2,1 105 HL & APL 3,0 111 Irauri JicaPR_1189 Nusa Tenggara 3,1 78 HSA-W 3,0 112 Poigar-4 JicaPR_0866 Sulawesi 2,6 138 HP 3,0 113 Kambera-3 JicaPR_1105 Nusa Tenggara 2,5 244 APL 30 2,9 114 Ranu-2 JicaPR_1206 Maluku 5,5 146 HL 2,9 115 Nua JicaPR_1222 Maluku 4,0 161 HPK 2,8 116 PLTM Soru fs_237 Nusa Tenggara 0,7 155 APL 2,8 117 Lariang-10 JicaPR_0840 Sulawesi 5,5 154 HL & HPT 2,8 PLTM Wanokaka 118 fs_246 Nusa Tenggara 0,6 156 APL 2,8 2 119 Dondo-1 JicaPR_1124 Nusa Tenggara 1,0 164 APL 2,7 Annex VIII – List of most promising sites – Rural Electrification strategy 3 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Installed Local LCOE Protected Weighted Project ID Island capacity Electrification - (USD/MWh) Area score (MW) Radius (km) 120 Taramanu-2 JicaPR_1140 Nusa Tenggara 4,1 197 APL 2,6 121 PLTM Tirtanagaya fs_229 Sulawesi 2,1 160 HPT 2,6 122 Larana JicaPR_1191 Nusa Tenggara 0,6 168 APL 2,6 123 Mama JicaPR_1204 Maluku 1,8 161 HPT 2,6 124 Bajo JicaPR_0779 Sulawesi 1,2 181 APL 2,5 125 Taima JicaPR_0729 Sulawesi 1,6 188 APL 2,5 126 PLTM Dako fs_161 Sulawesi 0,4 180 APL 2,5 127 PLTM Kadundung fs_202 Sulawesi 1,2 145 HL 2,5 128 Paguyaman-1 JicaPR_0715 Sulawesi 3,8 127 HSA-W 2,5 129 Dumoga-1 JicaPR_0860 Sulawesi 3,4 126 HSA-W 2,4 130 Iwoimenda JicaPR_0764 Sulawesi 2,4 164 HL 2,4 131 PLTM Bengkoli fs_168 Sulawesi 1,6 179 HPT & APL 2,4 132 PLTM Ponju fs_169 Sulawesi 0,8 177 HPT 2,3 PLTM 133 fs_228 Sulawesi 3,0 204 HPT 2,2 Sinombulung 134 Kolori hp_0281 Sulawesi 0,8 132 HSA-W 2,1 HL, HPT & 135 Pia JicaPR_1221 Maluku 3,5 197 2,1 HPK 136 Labu-2 JicaPR_0734 Sulawesi 0,9 223 APL 2,0 137 Ili-1 JicaPR_1201 Maluku 4,8 220 HL & HPT 1,9 138 Makariki hp_0216 Maluku 1,0 211 HPK 1,9 139 Awo JicaPR_0780 Sulawesi 0,8 193 HL 1,9 140 Mala JicaPR_1220 Maluku 2,4 247 HPT 1,6 141 Bayau-1 JicaPR_0856 Sulawesi 1,9 260 HPT 1,4 142 PLTM Pidung fs_174 Sulawesi 0,6 251 HPT 1,4 143 Sissa JicaPR_1121 Nusa Tenggara 1,4 286 APL 1,3 144 Lelipang hp_0297 Sulawesi 0,4 283 APL 1,2 145 Sumara JicaPR_0740 Sulawesi 1,3 209 HSA-W 1,2 146 Kalempang-3 JicaPR_0792 Sulawesi 0,4 288 APL 1,2 147 Dopi JicaPR_0747 Sulawesi 3,5 574 HPT 1,1 148 Malik JicaPR_0735 Sulawesi 0,3 350 APL 1,0 149 Lot JicaPR_1228 Maluku 0,2 497 APL 1,0 HSA-W & 150 Ayoung JicaPR_0859 Sulawesi 1,7 230 1,0 APL 151 Kina JicaPR_1217 Maluku 1,2 324 HPT 0,9 152 Toma-4 JicaPR_0756 Sulawesi 1,5 356 HL & HPK 0,7 153 Toma-3 JicaPR_0755 Sulawesi 0,6 889 HL 0,6 154 Ela JicaPR_1227 Maluku 0,2 556 HL 0,5 155 Bonehau hp_0448 Sulawesi 0,2 388 HL & APL 0,5 Annex VIII – List of most promising sites – Rural Electrification strategy 4 ANNEX IX - RESULTS FOR THE ISOLATED GRID SYSTEMS SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Analysis Results for the Isolated Grid Systems Table 1 - Annual Energy Demand and Annual Production Analysis Annual Annual Energy Demand (GWh) Project ID Code Production 5 km 7,5 km 10 km 15 km 20 km 25 km 30 km (GWh) radius radius radius radius radius radius radius PLTM Rongkong 3 fs_206 32,2 0,0 0,0 0,0 0,0 0,0 0,0 0,0 PLTM Karangana I fs_210 49,8 2,8 2,8 2,8 2,8 2,8 5,5 5,5 PLTM Karangana II fs_211 69,9 0,0 0,0 2,8 2,8 5,5 5,5 5,5 PLTM Mapahi fs_213 66,4 0,0 0,0 0,0 5,5 5,5 5,5 5,5 PLTM Sabuku fs_215 28,1 0,0 8,1 8,1 8,1 13,7 20,7 28,0 PLTM Tabong fs_216 38,6 3,7 3,7 3,7 3,7 3,7 3,7 11,1 PLTM Lobu fs_222 9,5 0,0 1,2 1,2 1,2 14,9 14,9 24,7 PLTM Masewo fs_223 39,9 2,8 2,8 2,8 2,8 5,5 5,5 5,5 PLTM Tirtanagaya fs_229 5,4 0,0 19,5 19,5 23,9 23,9 23,9 40,2 PLTM Pamoseang fs_231 17,4 0,0 0,0 0,0 0,0 0,0 0,0 0,0 PLTM Aralle fs_232 38,8 0,0 0,0 0,0 0,0 0,0 0,0 0,0 PLTM Soru fs_237 1,5 0,0 0,0 0,0 0,0 0,0 0,0 0,0 PLTM Harunda fs_242 4,9 0,0 0,0 0,0 0,0 0,0 0,0 0,0 PLTM Wanokaka 2 fs_246 0,7 0,0 0,0 0,0 0,0 0,0 0,0 0,0 Makariki hp_0216 2,1 0,0 0,0 0,0 0,0 0,0 0,0 0,0 Kolori hp_0281 2,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 Lelipang hp_0297 0,9 0,0 0,0 0,0 0,0 0,0 0,0 0,0 Riorita hp_0401 5,4 0,0 0,0 2,8 10,0 10,0 21,2 24,3 Mikuasi (PLN) hp_0447 6,7 4,0 4,0 6,9 18,0 19,9 27,9 33,4 Buleleng hp_0456 9,9 0,0 0,0 0,0 0,0 5,7 10,8 10,8 Malik JicaPR_0735 0,7 0,0 0,0 0,0 0,0 14,2 14,2 14,2 Sumara JicaPR_0740 3,2 0,0 0,0 0,0 0,0 0,0 0,0 4,8 Lasolo-2 JicaPR_0751 5,4 0,0 0,0 0,0 5,4 6,5 6,5 7,6 Toma-2 JicaPR_0754 4,1 0,0 0,0 0,0 1,0 4,2 4,2 4,2 Toma-3 JicaPR_0755 2,1 0,0 0,0 0,0 1,0 1,0 1,0 9,6 Toma-4 JicaPR_0756 4,0 1,0 1,0 1,0 1,0 1,0 1,0 5,4 Iwoimenda JicaPR_0764 6,7 0,0 10,0 10,0 10,0 12,3 12,3 23,4 Batuputi JicaPR_0786 5,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 Kalempang-3 JicaPR_0792 0,8 0,0 0,0 0,0 0,0 0,0 0,0 0,0 Rentelemo JicaPR_0811 11,9 0,0 0,0 0,0 0,0 0,0 0,0 0,0 Lariang-10 JicaPR_0840 13,8 0,0 3,2 3,2 3,2 3,2 8,8 19,0 Maraja-3 JicaPR_0848 3,2 0,0 0,0 0,0 3,8 26,1 30,2 30,2 Palame-1 JicaPR_1094 4,0 0,1 0,1 0,4 1,6 3,1 5,6 7,6 Palame-2 JicaPR_1095 10,3 0,0 0,1 0,4 1,6 2,6 6,0 8,5 Kadassa-2 JicaPR_1097 4,4 0,0 0,0 0,6 1,1 2,4 4,0 4,9 Melolo-1 JicaPR_1110 1,8 0,5 0,5 1,0 2,1 3,9 6,1 8,2 Melolo-2 JicaPR_1111 4,3 0,1 0,5 0,9 2,0 4,4 5,8 7,8 Dondo-1 JicaPR_1124 2,2 0,6 1,3 2,9 6,0 11,8 16,4 20,3 Menu-1 JicaPR_1181 12,0 3,3 4,9 8,7 15,2 21,0 27,2 33,4 Menu-2 JicaPR_1182 20,0 1,9 4,3 6,9 13,2 19,1 25,6 31,9 Annex IX – Results for the Isolated Grid Systems 1 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Project ID Code Annual Annual Energy Demand (GWh) Tuke JicaPR_1184 Production 11,4 2,2 4,4 7,1 13,8 21,0 28,4 34,5 (GWh) Anail JicaPR_1188 10,8 0,0 0,0 0,0 0,0 0,0 0,8 3,7 Irauri JicaPR_1189 6,9 0,0 0,0 0,0 0,0 0,0 0,8 3,7 Manasako JicaPR_1190 17,7 0,0 0,0 0,0 0,0 0,0 0,8 3,7 Larana JicaPR_1191 1,4 0,0 0,0 0,0 0,0 0,0 0,8 3,7 Ili-1 JicaPR_1201 12,6 0,0 0,0 0,0 0,0 0,5 1,4 2,1 Mama JicaPR_1204 4,9 0,0 0,0 0,4 1,2 1,7 2,3 2,7 Ranu-2 JicaPR_1206 16,2 0,1 0,2 0,3 0,4 0,6 0,8 1,3 Leman JicaPR_1208 3,6 0,0 0,9 1,1 2,2 3,0 3,6 5,0 Kina JicaPR_1217 2,7 0,0 0,0 0,0 0,0 0,1 0,1 1,1 Mala JicaPR_1220 6,8 0,3 0,3 0,3 1,2 1,6 2,7 4,2 Jajawi JicaPR_1230 16,6 0,0 0,0 0,2 0,4 0,7 0,9 1,0 Ngodama JicaPR_1236 17,5 0,0 0,0 0,6 1,5 2,6 3,4 4,0 Pastu Ra JicaPR_1247 3,3 0,2 0,4 1,4 2,7 4,5 6,1 9,2 Wooi Besar-2 JicaPR_1250 24,8 0,0 0,0 0,3 0,7 1,1 1,3 1,3 Wai Miha JicaPR_1251 3,6 0,4 0,5 0,8 1,4 1,9 3,5 5,1 Annual Energy Demand meets Annual Production Annual Energy and Peak Demand meets Annual Production and Installed Capacity Annex IX – Results for the Isolated Grid Systems 2 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Table 2 - Peak Demand and Installed Capacity Analysis Installed Peak Demand (MW) Project ID Code Capacity 5 km 7,5 km 10 km 15 km 20 km 25 km 30 km (MW) radius radius radius radius radius radius radius PLTM Rongkong 3 fs_206 4,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 PLTM Karangana I fs_210 6,1 0,6 0,6 0,6 0,6 0,6 1,1 1,1 PLTM Karangana II fs_211 8,6 0,0 0,0 0,6 0,6 1,1 1,1 1,1 PLTM Mapahi fs_213 8,2 0,0 0,0 0,0 1,1 1,1 1,1 1,1 PLTM Sabuku fs_215 3,5 0,0 1,7 1,7 1,7 2,8 4,2 5,7 PLTM Tabong fs_216 4,7 0,8 0,8 0,8 0,8 0,8 0,8 2,3 PLTM Lobu fs_222 1,2 0,0 0,2 0,2 0,2 3,0 3,0 5,0 PLTM Masewo fs_223 4,9 0,6 0,6 0,6 0,6 1,1 1,1 1,1 PLTM Tirtanagaya fs_229 0,7 0,0 4,0 4,0 4,9 4,9 4,9 8,2 PLTM Pamoseang fs_231 2,2 0,0 0,0 0,0 0,0 0,0 0,0 0,0 PLTM Aralle fs_232 4,8 0,0 0,0 0,0 0,0 0,0 0,0 0,0 PLTM Soru fs_237 0,2 0,0 0,0 0,0 0,0 0,0 0,0 0,0 PLTM Harunda fs_242 0,7 0,0 0,0 0,0 0,0 0,0 0,0 0,0 PLTM Wanokaka 2 fs_246 0,1 0,0 0,0 0,0 0,0 0,0 0,0 0,0 Makariki hp_0216 0,3 0,0 0,0 0,0 0,0 0,0 0,0 0,0 Kolori hp_0281 0,3 0,0 0,0 0,0 0,0 0,0 0,0 0,0 Lelipang hp_0297 0,1 0,0 0,0 0,0 0,0 0,0 0,0 0,0 Riorita hp_0401 0,7 0,0 0,0 0,6 2,0 2,0 4,1 4,8 Mikuasi (PLN) hp_0447 0,8 0,8 0,8 1,3 3,5 3,9 5,4 6,5 Buleleng hp_0456 1,2 0,0 0,0 0,0 0,0 1,2 2,2 2,2 Malik JicaPR_0735 0,1 0,0 0,0 0,0 0,0 2,9 2,9 2,9 Sumara JicaPR_0740 0,4 0,0 0,0 0,0 0,0 0,0 0,0 1,0 Lasolo-2 JicaPR_0751 0,7 0,0 0,0 0,0 1,1 1,3 1,3 1,5 Toma-2 JicaPR_0754 0,5 0,0 0,0 0,0 0,2 0,8 0,8 0,8 Toma-3 JicaPR_0755 0,3 0,0 0,0 0,0 0,2 0,2 0,2 1,9 Toma-4 JicaPR_0756 0,5 0,2 0,2 0,2 0,2 0,2 0,2 1,0 Iwoimenda JicaPR_0764 0,8 0,0 2,0 2,0 2,0 2,4 2,4 4,6 Batuputi JicaPR_0786 0,6 0,0 0,0 0,0 0,0 0,0 0,0 0,0 Kalempang-3 JicaPR_0792 0,1 0,0 0,0 0,0 0,0 0,0 0,0 0,0 Rentelemo JicaPR_0811 1,5 0,0 0,0 0,0 0,0 0,0 0,0 0,0 Lariang-10 JicaPR_0840 1,7 0,0 0,7 0,7 0,7 0,7 2,0 4,1 Maraja-3 JicaPR_0848 0,4 0,0 0,0 0,0 0,8 5,3 6,1 6,1 Palame-1 JicaPR_1094 0,5 0,0 0,0 0,1 0,3 0,7 1,2 1,6 Palame-2 JicaPR_1095 1,3 0,0 0,0 0,1 0,4 0,6 1,3 1,8 Kadassa-2 JicaPR_1097 0,6 0,0 0,0 0,1 0,2 0,5 0,9 1,1 Melolo-1 JicaPR_1110 0,2 0,1 0,1 0,2 0,5 0,8 1,3 1,8 Melolo-2 JicaPR_1111 0,5 0,0 0,1 0,2 0,4 1,0 1,2 1,7 Dondo-1 JicaPR_1124 0,3 0,1 0,3 0,6 1,3 2,6 3,5 4,4 Menu-1 JicaPR_1181 1,5 0,7 1,1 1,9 3,3 4,5 5,9 7,2 Menu-2 JicaPR_1182 2,5 0,4 0,9 1,5 2,8 4,1 5,5 6,9 Tuke JicaPR_1184 1,4 0,5 0,9 1,5 3,0 4,5 6,1 7,4 Anail JicaPR_1188 1,3 0,0 0,0 0,0 0,0 0,0 0,2 0,7 Annex IX – Results for the Isolated Grid Systems 3 SMALL HYDROPOWER MAPPING AND IMPROVED GEOSPATIAL ELECTRIFICATION PLANING - INDONESIA SMALL HYDROPOWER POTENTIAL IN NTT, MALUKU, MALUKU UTARA AND SULAWESI REPORT Irauri JicaPR_1189 0,9 0,0 0,0 0,0 0,0 0,0 0,2 0,7 Manasako JicaPR_1190 2,2 0,0 0,0 0,0 0,0 0,0 0,2 0,7 Larana JicaPR_1191 0,2 0,0 0,0 0,0 0,0 0,0 0,2 0,7 Ili-1 JicaPR_1201 1,6 0,0 0,0 0,0 0,0 0,1 0,3 0,4 Mama JicaPR_1204 0,6 0,0 0,0 0,1 0,2 0,3 0,4 0,5 Ranu-2 JicaPR_1206 2,0 0,0 0,0 0,1 0,1 0,1 0,2 0,2 Leman JicaPR_1208 0,4 0,0 0,2 0,2 0,4 0,6 0,7 0,9 Kina JicaPR_1217 0,3 0,0 0,0 0,0 0,0 0,0 0,0 0,2 Mala JicaPR_1220 0,8 0,1 0,1 0,1 0,2 0,3 0,5 0,8 Jajawi JicaPR_1230 2,0 0,0 0,0 0,0 0,1 0,1 0,2 0,2 Ngodama JicaPR_1236 2,2 0,0 0,0 0,1 0,3 0,5 0,7 0,8 Pastu Ra JicaPR_1247 0,4 0,0 0,1 0,3 0,5 0,9 1,2 1,9 Wooi Besar-2 JicaPR_1250 3,0 0,0 0,0 0,1 0,1 0,2 0,3 0,3 Wai Miha JicaPR_1251 0,5 0,1 0,1 0,2 0,3 0,4 0,7 1,0 Peak Demand meets Installed Capacity Annual Energy and Peak Demand meets Annual Production and Installed Capacity Annex IX – Results for the Isolated Grid Systems 4 GESTO ENERGIA S.A. Av. Cáceres Monteiro, nº 10, 1º Sul 1495-131 Algés, Portugal T. +351 211 579 899 F. +351 211 540 900 www.gestoenergy.com