SFG2799 v2 MINISTERE DE L’AGRICULTURE ET DES BURKINA FASO AMENAGEMENTS HYDRAULIQUES ******** Unité - Progrès - Justice PROJET D’APPUI REGIONAL A L’INITIATIVE POUR L’IRRIGATION AU SAHEL (PARIIS) ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK – ESMF for SIIP-Burkina Faso EXECUTIVE SUMMARIES IN ENGLISH AND FRENCH Executive summary 1. Project overall objective, components and main activities The Regional Support Project for Irrigation Initiative in the Sahel (PARIIS) is part of the dynamics of the High Level Forum on Irrigation held in Dakar on October 31, 2013 and which brought together the Heads of State and Governments of six Sahelian countries, with the main regional integration organizations (CILSS, ECOWAS, WAEMU), the World Bank, FAO and several international, inter-African, bi and multilateral organizations and institutions. It constitutes the essential cornerstone to achieve the qualitative and quantitative objectives of the Dakar Declaration and to establish the conditions for durability and sustainability of the investments made in the irrigated agriculture sector and to increase exploited areas. At the national level, PARIIS is part of the strategic reflections undertaken by the Government of Burkina Faso and its partners, reflected in national policies and strategies, namely the Accelerated Growth and Sustainable Development Strategy (SCADD), the Rural Development Strategy (SDR) and the Sustainable Development of Irrigation Policy. The development objective of the PARIIS project is to strengthen stakeholders’ capacities to develop and manage irrigation and increase irrigated areas by following a regional approach based on the solutions in six countries of the Sahel. PARIIS targets the following key measurable outcomes: - Access to land and water on irrigated perimeters is improved; - The planning system and the mode of realization of investments are concerted and based on analyses of reliable data and targeted studies; - The tasks, functions and responsibilities of the various actors in the development and management of irrigation are clarified; - Bankable investments (all types) borne by the project obtain financing; - Solutions for the revitalization and long-term management of existing irrigated systems (all types) are available and implemented in selected areas; - Development solutions for new small and medium-size irrigated systems are available and implemented in selected areas; - Quality services to producers and field operators are available and accessible in selected areas; - Information and knowledge on irrigation are shared among stakeholders; - Project management and steering are effective. To achieve these results, project activities are organized into three components: (i) institutional capacities for investment planning and management by stakeholders are strengthened; (ii) irrigated/developed areas are extended and the quality of interventions in the sector are improved; And (iii) actors have the information/knowledge for the management and development of investments in the irrigated sector. The PARIIS-BF project will be implemented in four (4) regions of the country: North, Boucle du Mouhoun, Central-West and Center. The project intervention strategy envisages the start of activities in two (2) regions for the first two years (Boucle du Mouhoun and Nord) with a gradual extension to the other regions for the following years. With regard to the activities to be carried out, the types of planned irrigation schemes are: - Type 1: Lowland; - Type 2: Small private individual irrigation; - Type 3: Village irrigated perimeters; - Type 4: Large public developments. The project will involve more than 10,210 direct beneficiaries, including 2,482 women, ie 24.30% through the rehabilitation of 100 ha of existing irrigated perimeters and the realization of 920 ha of new irrigated perimeters and lowlands plus about 3,000 ha of complementary irrigation from small retention basins. It will also contribute to the improvement of associated services (consulting, financial services, warehousing, etc.) and access infrastructures. The actors involved in the development and management of the irrigated sector will also benefit from a better institutional environment and capacity building programs. The PARIIS Burkina Faso has an estimated total cost of about FCFA 18 billion. 2. Major environmental and social issues in the potential areas for sub-projects implementation The major environmental and social issues in the potential areas for sub-projects implementation include: - Contribution to the implementation of the Government of Burkina Faso's sustainable development policy for irrigated agriculture and food security; - Direct economic spin-offs for the populations of the project's intervention regions (jobs, incomes, opening-up, etc.); - Expropriation of portions of agricultural land and temporary loss of sources of income; - The risks of land conflicts related to the increase of the population around the reservoirs; - Destruction of vegetation cover. 3. Legal and Institutional Framework of Environmental and Social Assessments The legal and institutional framework for environmental and social assessments takes into account that of Burkina Faso and the Operational Policies of the World Bank which are triggered by this ESMF (OP4.01, OP4.12, OP4.37, OP4.09, and OP4.11). On the basis of the environmental and social provisions in force at national level and at the level of the World Bank, the project is classified in category A of activities subject to environmental assessment (OP 4.01, Decree No. 2015/1187/PRES/TRANS/PM/MERH/MATD/MS/MS/ MARHASA/MRA/MICA/MHU/MIDT/MCT, providing conditions and procedures for conducting and validating the ESIA, and the Environmental and Social Impact Statement). To meet the policy objectives triggered, the following documents were prepared: (i) the Environmental and Social Management Framework (ESMF), (ii) the Resettlement Policy Framework (RPF), and (iii) the Pests and Pesticides Management Plan (PPMP). In addition, in order to meet the requirements of OP 4.37, the Government has drawn up terms of reference to carry out a study on the safety of the Toecé dam and periodic safety inspections. 4. Environmental and social impacts/risks by type of sub-projects or micro-projects The main environmental and social impacts/risks by type of subprojects are shown in the following table: N° Sub-projects Key positive environmental and social Key adverse environmental and social impacts/ risks impacts/ risks 1 - Institutional Strengthening - Better producer organization - - Capacity Development - Developing the technical capacities of producers - Improvement of health and hygiene in rural areas - Better gender mainstreaming 2 - Implementation of irrigated - Improving irrigated agricultural - Degradation and depletion of production facilities productivity and food security vegetation cover - Equipment in high- - Occupation of producers - Pollution of water and soil and performance technology - Income generation nuisances due to the uncontrolled packages - Development of community use of chemicals activities - Disturbances to aquatic, terrestrial - Improved water availability and avian fauna 3 Access routes to production areas - Ease of access to basic social - Disruption of economic activities (opening-up) services - Degradation of some habitats - Ease of access to markets - Destruction of portions of crop fields - Propagation of STIs/HIV AIDS - Insect vector proliferation (malaria and bilharziasis) - Destruction of vegetation cover and disturbance of ecosystems. 4 Construction of storage warehouses - Improving the security/ Intoxication or serious accidents in material conservation of agricultural handlers products 5 Project management - Improved efficiency in project Monitoring and evaluation management 5. Environmental and social management measures for the implementation of sub- projects Environmental and social management measures are proposed by sub-component of the project and by sub-projects (or micro-projects). Details are set out in the appendix to this ESMF. For Component A "Institutional capacities for investment planning and management by stakeholders are strengthened", the sub-projects for which mitigation measures have been defined are: - Institutional strengthening; - Capacity development. For Component B "Irrigated/ developed areas are expanded and the quality of interventions in the sector are improved", the sub-projects for which mitigation measures have been defined are: - Construction of storage warehouses; - Equipment in high-performance technology packages; - Implementation of irrigated production facilities; - Use of agricultural inputs (fertilizers and chemicals, etc.); - Access roads to production areas (opening-up). Regarding Component C "The actors have the information/knowledge for the management and development of investments in the irrigated sector", the sub-projects for which mitigation measures have been defined are: - Project management - Monitoring and evaluation. - 6. Procedure for the environmental and social management of eligible sub-projects The procedure for the environmental and social management of eligible sub-projects comprises three (3) main phases with roles for different actors: Phase 1: Scoping, conducting the study and public consultation: - Environmental and Social Screening / Sub-Project Category Proposal (PCU); - Determination of the project category (BUNEE); - Elaboration of terms of reference (PCU); - Validation of terms of reference (BUNEE); - Field Investigations/Stakeholder Consultation / Drafting of the ESIA / EIS report (Consultant); - Public Inquiry (Ministry in charge of the Environment). Phase 2: Review of the report and issue of the reasoned opinion: - Analysis of the ESIA report and the public inquiry report/Analysis of the EIS report (BUNEE/COTEVE); - Preparation of the draft sub-project environmental compliance statement (BUNEE); - Sub-project Environmental Compliance Decision Statement (Minister of the Environment). Phase 3: Environmental Monitoring - Supervision missions (PMU, World Bank, BUNEE, Beneficiaries); - Follow-up of project implementation conditions (PMU, World Bank, BUNEE, Beneficiaries); - Monitoring and verification of compliance with the environmental and social management plan (PMU, World Bank, BUNEE, and Beneficiaries). 7. Main indicators of the ESMF implementation A set of indicators has been defined for monitoring the implementation of the ESMF. The main indicators are: - Number of ESIA / ESIS carried out; Number of monitoring missions carried out; - Number of training sessions organized on environmental and social safeguarding; - Number of IEC awareness sessions organized on the environmental and social issues of the project and on good practices; - Availability of maintenance manuals for irrigation equipment; - Availability of an environmental and social procedures manual. 8. Organizational framework for the implementation of measures The organizational framework for the implementation of ESMF measures includes: - The Steering Committee of the project; - National Committee for the Coordination and Monitoring of the Formulation Process of the Regional Program for Irrigation Development in the Sahel / Dakar Initiative (CNCS- SIIP); - The Project Coordination Unit (PCU) and/or the Delegated Contracting Authority/ DCA; - The BUNEE; - Local Authorities (Town Hall, Regions); - Decentralized technical services (Agriculture, Livestock, Environment, etc.); - Associations of agricultural producers and beneficiary users of agricultural water; - Village Development Councils (CVD); - Private Service providers and operators. The following table outlines roles and responsibilities in the implementation of the ESMF. Matrix of roles and responsibilities for the implementation of the ESMF No Stages / Activities Responsible Support / Provider Collaboration 1. Identification of the location / Regional focal points (RFP) • Decentralized - sites and main technical services characteristics of the sub- project (E&S filter) • CVD • Beneficiaries Environmental selection Environmental and Social • Beneficiaries - 2. (Screening-filling of forms) and Safeguard Specialist (SSES) • Mayors determination of the specific of the PCU • SSES/PCU kind of backup tool No Stages / Activities Responsible Support / Provider Collaboration 3. Approval of categorization by Project Coordinator • SSES/PU • National Entity the ESIA entity and the Bank responsible for ESIA (EN-EIE) • World Bank 4.1. Preparation of the specific Category A sub-project E & S backup instrument Preparation, approval and • EN-EIE • The World Bank publication of the TOR SSES/UP Conduct of the study including • Procurement • Consultant public consultation Specialist (SPM); • EN-EIE ; • Mayors Validation of the document and • SPM, Mayors • EN-EIE, obtaining the environmental • The World Bank certificate Publication of the document Coordinator • Media ; • The World Bank 4.2. Preparation of the specific B & C sub-project E&S backup instrument Preparation and approval of the The World Bank TOR Conduct of the study including Environmental and Social • Procurement • Consultant public consultation Safeguard Specialist (SSES) Specialist(SPM) of the PCU • BUNEE ; • Mayors Validation of the document and • SPM, • BUNEE, obtaining the environmental • Mayors • The World Bank certificate Publication of the document • Coordinator • Media; • The World Bank Integration in the tender dossier 5. (DAO) of the subproject, of all Technical manager (RT) of • SSES the measures of the phase work the activity • SPM able to be contracted with the company Execution/ implementation of SSES • SPM • Consultant 6. measures not contracted with MOD • RT • NGOs the construction company • Financial Officer • Others • Mayors • xxx Internal monitoring of the SSES • Specialist in Control office implementation of E & S Monitoring- 7. measures Evaluation (S-SE) Specialist in Monitoring and Evaluation (S-SE) • FO • Mayors • Decentralized services Dissemination of internal Coordinator SSES monitoring report External monitoring of the EN-EIE SSES implementation of E & S measures 8. Environmental and social SSES/PCU and/or DCA • Others decentralized • laboratories/ specialized monitoring (MOD) SSES centers • NGOs No Stages / Activities Responsible Support / Provider Collaboration • Regional focal points (RFPs) • S-ME • CVD 9. Strengthening the capacities of SSES/PCU • Other SSES • Consultants stakeholders in E & S • SPM • Qualified public implementation • Beneficiaries structures Audit of implementation of E & SSES/PCU • Other SSES • Consultants 11. S measures • SPM • S-ME • EN-EIE • Mayors 9. Estimated overall budget for the implementation of the ESMF The estimated budget for the implementation of the ESMF amounts to six hundred and twenty- five million (625,000,000) FCFA francs. Project Activity Potential Mitigation measures Responsibility Schedule Cost estimates environmental Implementation Monitoring of (FCFA) and social of mitigation implementation impacts measures measures Studies to be 01 EIAs for Recruitment of UCP-PARIIS et SSES-PARIIS If necessary 350 000 000 carried out (01 some sub- consultants to carry MOD WB EIA et 60 EIS) projects of the out EIAs and EISs Consultants PARIIS (including validation) (development Dourou) Capacity Organize training SSES-PARIIS, PFR Regional and 35 000 000 Building Misconception sessions and BUNEE DREEVCC communal of the EIA and workshops on workshops the stakes of the EIA / EIS 1st year environmental Carry out public SSES-PARIIS PFR Annual 20 000 000 management of awareness campaigns NGOs DREEVCC campaigns work sites (1st year) Preparation of Lack of Environmental SSES-PARIIS PFR 1st, 2nd and3rd Included in the standard environmental conditions included in BUNEE years sub-project conditions conditions bidding documents DREEVC BM Water quality Misuse of Ownership of good SSES-PARIIS PFR 2nd, 3rd and 4th 35 000.000 monitoring chemicals practices BUNEE years DREEVCC WB Soil quality Misuse of Ownership of good Producers SSES-PARIIS 2nd, 3rd and 4th 40 000.000 monitoring chemicals practices PFR year BUNEE Laboratories Local actors Water Agencies Ecological Misuse of Ownership of good Producers SSES-PARIIS 3rd year 30 000 000 monitoring chemicals practices PFR (fauna and BUNEE flora) Laboratories BUNASOLS Reforestation of Destruction of Availability of Producers SSES-PARIIS 2nd, 3rd and 4th 90 000 000 compensation vegetable cover seedlings and PFR year (30 groves + necessary land BUNEE alignment) DGFF Supervision Non application Ensure compliance Contractors SSES-PARIIS Mid-term 25 000 000 Monitoring and of measures with ESMF measures PFR End of year evaluation (BUNEE BUNEE Convention) DREECC WB Total 625 000 000 10. Public Consultations carried out As part of the preparation of the ESMF, consultations were held from July 01 to 05, 2016 with the local populations in the intervention areas of PARIIS-BF and in the technical services responsible for supervising producers (Agriculture, livestock, environment, etc.). As regards the local populations, consultations took place in the village of Dourou (commune of Kirsi / Northern Region), then in the Boucle du Mouhoun Region in Lémini (commune of Bourasso) and Tiankuy (commune of Dédougou). The main concerns include: - Strong expectation of local populations in the distribution of plots managed for irrigated production; - Weakness of producers' capacities (technical routes, dosage of fertilizers and pesticides, techniques for making bunds, etc.); - Concern about the treatment of socio-cultural issues (tombs and sacred sites); - Need for community infrastructure at resettlement sites where appropriate, including boreholes; - Concerns regarding land-to-land compensation for PAPs that would lose agricultural land. As regards technical services responsible for supervising producers, the following concerns were raised: - Inadequate information and involvement in project activities and the implementation of ESMPs; - Weak capacities of agents of the deconcentrated services of the State in terms of environmental and social safeguard; - Inadequate consideration of bank protection issues in projects. 11. Conclusion The political, institutional and legal context of the environmental sector and of PARIIS intervention areas is marked by the existence of strategic planning documents as well as legislative and regulatory texts. However, at the institutional level, despite significant progress, inadequacies are noted in terms of capacities and competencies for the implementation of the ESMP measures. To better optimize the implementation of the PARIIS-BF Framework for Environmental and Social Management (ESMP), mitigation measures, environmental standards, a monitoring program and detailed recommendations for institutional arrangements and an estimated budget were defined. This ESMF is complemented by the Resettlement Policy Framework (RPF) and the Pest Management Plan (PPMP). Résumé exécutif 1. Objectif global, composantes et principales activités du projet Le Projet d’Appui Régional à l’Initiative pour l’Irrigation au Sahel (PARIIS) s’inscrit dans la dynamique du forum de Haut Niveau sur l’irrigation tenu à Dakar le 31 octobre 2013 et qui a réuni les Chefs d’Etat et de Gouvernement de six pays sahéliens avec à leurs côtés, les principales organisations d’intégration régionale (le CILSS, la CEDEAO, l’UEMOA), la Banque Mondiale, la FAO et de plusieurs organisations et institutions internationales, interafricaines, bi et multilatérales. Il constitue la pierre angulaire indispensable pour atteindre les objectifs qualitatifs et quantitatifs de la Déclaration de Dakar et mettre en place les conditions pour la pérennisation et la durabilité des investissements réalisés dans le secteur de l’agriculture irriguée et accroître les superficies exploitées. Au plan national, le PARIIS s’inscrit dans le cadre des réflexions stratégiques entreprises par le Gouvernement du Burkina Faso et de ses partenaires, traduites dans les politiques et stratégies nationales en l’occurrence la Stratégie de Croissance Accélérée et de Développement Durable (SCADD), la Stratégie de Développement Rural (SDR) ainsi que la politique de développement durable de l’irrigation. L’objectif de développement du projet PARIIS est de renforcer les capacités des parties prenantes à développer et gérer l’irrigation et d’accroître les superficies irriguées en suivant une approche régionale basée sur les solutions dans six pays du Sahel. Le PARIIS vise les principaux résultats mesurables suivants : - L’accès au foncier et à l’eau sur les périmètres irrigués est amélioré ; - Le système de planification et le mode de réalisation des investissements sont concertés et reposent sur des analyses de données fiables et des études ciblées ; - Les missions, fonctions et responsabilités des différents acteurs du développement et de la gestion de l’irrigation sont clarifiées ; - Des investissements bancables (tous types) portés par le projet obtiennent des financements ; - Des solutions de revitalisation et de gestion pérenne des systèmes irrigués existants (tous types) sont disponibles et mises en oeuvre dans des zones sélectionnées ; - Des solutions de développement de nouveaux systèmes irrigués de petite et moyenne taille sont disponibles et mises en oeuvre dans des zones sélectionnées ; - Des services de qualité aux producteurs et opérateurs de terrain sont disponibles et accessibles dans des zones sélectionnées ; - Les informations et les connaissances en matière d’irrigation sont partagées entre les acteurs ; - La gestion et le pilotage du projet sont efficaces. Pour atteindre ces résultats, les activités du projet sont organisées en trois composantes : (i) les capacités institutionnelles de planification et de gestion des investissements par les parties prenantes sont renforcées ; (ii) les superficies irriguées/aménagées sont étendues et la qualité des interventions dans le secteur améliorée ; et (iii) les acteurs disposent des informations/connaissances pour la gestion et le développement des investissements dans le secteur irrigué. Le projet PARIIS-BF sera mis en oeuvre dans quatre (4) régions du pays : Nord, Boucle du Mouhoun, Centre- Ouest et Centre. La stratégie d’intervention du projet prévoit un démarrage des activités dans deux (2) régions pour les deux premières années (Boucle du Mouhoun et Nord) avec une extension progressive aux autres régions pour les années suivantes. S’agissant des activités à mener, les types d’aménagements/irrigation prévus sont : - Type 1 : Bas-fonds ; - Type 2 : Petite irrigation individuelle privée ; - Type 3 : Périmètres irrigués villageois ; - Type 4 : Grands aménagements publics. Le projet concernera plus de 10 210 bénéficiaires directs dont 2 482 femmes, soit 24,30% à travers la réhabilitation de 100 ha de périmètres irrigués existants et la réalisation de 920 ha de nouveaux périmètres irrigués et de bas-fonds plus environ 3 000 ha d’irrigation de complément à partir de petits bassins de rétention. Il contribuera également à l’amélioration des services associés (conseil, services financiers, entreposage etc.) et des infrastructures d’accès. Les acteurs impliqués dans le développement et la gestion du secteur irrigué bénéficieront en outre d’un meilleur environnement institutionnel et de programmes de renforcement des capacités. Le PARIIS Burkina Faso a un coût global estimé à environ 18 milliards FCFA. 2. Enjeux environnementaux et sociaux majeurs des zones potentielles d’implantation des sous-projets Les enjeux environnementaux et sociaux majeurs du projet dans les zones potentielles d’implantation des sous-projets sont entre autres : - La contribution à la réalisation de la politique de développement durable de l’agriculture irriguée et de sécurité alimentaire du Gouvernement du Burkina Faso ; - Les retombées économiques directes pour les populations des régions d’intervention du projet (emplois, revenus, désenclavement, etc.) ; - L’expropriation de portions de terres agricoles et la perte temporaires de sources de revenus ; - Les risques de conflits fonciers liés à l’accroissement de la population aux environs des retenues d’eau ; - La destruction du couvert végétal. 3. Cadre juridique et institutionnel des évaluations environnementales et sociales Le cadre juridique et institutionnel des évaluations environnementales et sociales prend en compte celui du Burkina Faso ainsi que les Politiques Opérationnelles de la Banque Mondiale qui sont déclenchées par le présent CGES (OP4.01, OP4.12, OP4.37, OP4.09, OP4.11). Sur la base des dispositions environnementales et sociales en vigueur au niveau national comme au niveau de la Banque Mondiale, le projet est classé dans la catégorie A des activités assujetties à une évaluation environnementale (PO 4.01, décret N°2015/1187/PRES/TRANS/PM/MERH/MATD/MME/MS/MARHASA/MRA/MICA/MHU/MI DT/MCT, portant conditions et procédures de réalisation et de validation de l'évaluation environnementale stratégique (EES), de l'étude et de la notice d'impact environnemental et social). Pour répondre aux exigences liées aux objectifs des politiques déclenchées, les documents suivants ont été préparés : (i) le Cadre de Gestion Environnementale et Sociale (CGES), (ii) le Cadre de Politique de Réinstallation (CPR) et (iii) le Plan de Gestion des Pestes et Pesticides (PGPP). Par ailleurs, pour répondre aux exigences de la PO 4.37, le Gouvernement a élaboré des termes de référence pour réaliser une étude sur la sécurité du barrage de Toécé et les inspections sécuritaires à conduire périodiquement. 4. Impacts/risques environnementaux et sociaux par type de sous-projets ou microprojets Les principaux impacts/risques environnementaux et sociaux par type de sous-projets sont indiqués dans le tableau suivant : N° Sous-projets Principaux impacts/risques Principaux impacts/risques environnementaux et sociaux positifs environnementaux et sociaux négatifs 1 - Renforcement - Meilleure organisation des - institutionnel producteurs - Développement des - Développement des capacités capacités techniques des producteurs - Amélioration de la santé et de l’hygiène en milieu rural - Meilleure prise en compte du genre 2 - Réalisation des - Amélioration de la - Dégradation et appauvrissement du aménagements de productivité agricole irriguée et couvert végétal production irriguée de la sécurité alimentaire - Pollution des eaux &sols et - Equipement en paquets - Occupation des producteurs nuisances liées aux usages technologiques - Création de revenus incontrôlés des produits chimiques performants - Développement des activités - Perturbations sur la faune communautaires aquatique, terrestre et aviaire - Amélioration de la disponibilité de l’eau 3 Pistes d’accès aux zones de - Facilité d’accès aux services - Perturbation d’activités production (désenclavement) sociaux de base économiques - Facilité d’accès aux marchés - Dégradation de quelques habitats - Destruction de portions de champs de culture - Propagation des IST/ VIH SIDA - Prolifération d’insectes vecteurs (paludisme et bilharziose) - Destruction du couvert végétal et perturbation des écosystèmes. 4 Construction de magasins de - Amélioration de la Intoxication ou accidents graves chez les stockage de produits sécurisation/conservation des manutentionnaires produits agricoles 5 Gestion du projet - Meilleure efficacité dans la Suivi-évaluation gestion du projet 5. Mesures de gestion environnementale et sociale pour la mise en oeuvre des sous-projets Les mesures de gestion environnementale et sociale sont proposées par sous-composante du projet et par sous-projets (ou micro-projet). Les détails sont précisés en annexe du présent CGES. Pour la Composante A « Les capacités institutionnelles de planification et de gestion des investissements par les parties prenantes sont renforcées », les sous-projets pour lesquels les mesures d’atténuation ont été définies, sont : - Renforcement institutionnel ; - Développement des capacités. Pour la Composante B « Les superficies irriguées/aménagées sont étendues et la qualité des interventions dans le secteur améliorée », les sous-projets pour lesquels les mesures d’atténuation ont été définies, sont : - Construction de magasins de stockage de produits ; - Equipement en paquets technologiques performants ; - Réalisation des aménagements de production irriguée ; - Utilisation des intrants agricoles (engrais et produits chimiques, etc.) ; - Pistes d’accès aux zones de production (désenclavement). Concernant la Composante C « Les acteurs disposent des informations/connaissances pour la gestion et le développement des investissements dans le secteur irrigué », les sous-projets pour lesquels les mesures d’atténuation ont été définies, sont : - Gestion du projet - Suivi-évaluation. 6. Procédure de gestion environnementale et sociale des sous-projets éligibles La procédure de gestion environnementale et sociale des sous-projets éligibles comporte trois (3) principales phases avec des rôles pour différents acteurs : Phase 1 : Cadrage, réalisation de l’étude et consultation du public : - Screening environnemental et social/Proposition de la catégorie du sous-projet (UCP) ; - Détermination de la catégorie du projet (BUNEE) ; - Elaboration des termes de références (UCP) ; - Validation des termes de références (BUNEE) ; - Investigations de terrain /Consultation des parties prenantes/Rédaction du rapport EIES/NIES (Consultant) ; - Enquête publique (Ministère chargé de l’Environnement). Phase 2 : Examen du rapport et délivrance de l’avis motivé : - Analyse du rapport EIES et du rapport d’enquête publique /Analyse du rapport NIES (BUNEE/COTEVE) ; - Préparation du projet d’avis de conformité environnementale du sous-projet (BUNEE) ; - Décision d’avis de conformité environnementale du sous-projet (Ministre chargé de l’Environnement). Phase 3: Suivi environnemental : - Missions de supervision (UGP, Banque mondiale, BUNEE, Bénéficiaires) ; - Suivi à posteriori des conditions d’exécution du projet (UGP, Banque mondiale, BUNEE, Bénéficiaires) ; - Contrôle et vérification de la conformité avec le plan de gestion environnementale et sociale (UGP, Banque mondiale, BUNEE, Bénéficiaires). 7. Principaux indicateurs de mise en oeuvre du CGES Une série d’indicateurs a été définie pour le suivi de la mise en oeuvre du CGES. Il s’agit principalement des indicateurs suivants : - Nombre d’EIES/NIES réalisées ; - Nombre de missions de suivi réalisées ; - Nombre de séances de formation organisées en matière de sauvegarde environnementale et sociale ; - Nombre de séances de sensibilisation IEC organisées sur les enjeux environnementaux et sociaux du projet et sur les bonnes pratiques ; - Disponibilité de manuels d’entretien et maintenance des équipements d’irrigation ; - Disponibilité d’un manuel de procédures environnementales et sociales. 8. Cadre organisationnel de mise en oeuvre des mesures Le cadre organisationnel de mise en oeuvre des mesures du CGES comprend : - Le Comité de pilotage du projet ; - Le Comité National de Coordination et de Suivi du processus de formulation du Programme Régional de Développement de l’Irrigation au Sahel/Initiative de Dakar (CNCSSIIP) - L’Unité de Coordination du projet (UCP) et/ou la Maîtrise d’ouvrage déléguée/MOD ; - Le BUNEE ; - Les Collectivités territoriales (Mairie, Régions) ; - Les Services techniques déconcentrés (Agriculture, Elevage, Environnement, etc.) ; - Les Associations de producteurs et d’usagers de l’eau agricole bénéficiaires ; - Les Conseils Villageois de Développement (CVD) ; - les Prestataires et opérateurs privés. Le tableau suivant précise les rôles et responsabilités dans la mise en oeuvre du CGES. Matrice des rôles et responsabilités pour la mise en oeuvre du CGES No Etapes/Activités Responsable Appui/Collaboration Prestataire 1. Identification de la Points focaux régionaux • Services - localisation/sites et principales (PFR) déconcentrés caractéristiques techniques du • CVD sous-projet (Filtre E&S) • Bénéficiaires Sélection environnementale Spécialiste Sauvegarde • Bénéficiaires - 2. (Screening-remplissage des Environnementale et • Maires formulaires) et détermination Sociale (SSES) de l’UP • SSES/UCP du type d’instrument spécifique • de sauvegarde 3. Approbation de la Coordonnateur du Projet • SSES/UP • Entité nationale chargée catégorisation par l’entité des EIES(EN-EIE) chargée des EIES et la Banque • Banque mondiale 4.1. Préparation de l’instrument spécifique de sauvegarde E&S de sous-projet de catégorie A Préparation, approbation et • EN-EIE • Banque mondiale publication des TDR SSES/UP Réalisation de l’étude y • Spécialiste passation • Consultant compris consultation du public de marché (SPM); • EN-EIE ; • Maires Validation du document et • SPM, Maires • EN-EIE, obtention du certificat • Banque mondiale environnemental Publication du document Coordonnateur • Médias ; • Banque mondiale 4.2. Préparation de l’instrument spécifique de sauvegarde E&S de sous-projet de catégorie B ou C Préparation et approbation des Banque mondiale TDR Réalisation de l’étude y Spécialistes en sauvegarde • Spécialiste passation • Consultant compris consultation du public environnementales et de marché (SPM); sociales (SSES) de l’UP • BUNEE ; • Maires Validation du document et • SPM, • BUNEE, obtention du certificat • Maires • Banque mondiale environnemental Publication du document • Coordonnateur • Médias ; • Banque mondiale Intégration dans le dossier 5. d’appel d’offres (DAO) du Responsable technique • SSES sous-projet, de toutes les (RT) de l’activité • SPM mesures de la phase des travaux contractualisables avec l’entreprise Exécution/Mise en œuvre des SSES • SPM • Consultant 6. mesures non contractualisées MOD • RT • ONG avec l’entreprise de • Responsable • Autres construction financier (RF) • Maires No Etapes/Activités Responsable Appui/Collaboration Prestataire Surveillance interne de la mise SSES • Spécialiste en Suivi- Bureau de Contrôle en œuvre des mesures E&S Evaluation (S-SE) 7. • RF • Maires • Services déconcentrés Diffusion du rapport de Coordonnateur SSES surveillance interne Surveillance externe de la mise EN-EIE SSES en œuvre des mesures E&S 8. Suivi environnemental et social SSES/UCP et/ou Maître • Autres SSES • Laboratoires /centres d’ouvrage délégué (MOD) déconcentrés spécialisés • Points focaux • ONG régionaux (PFR) • S-SE • CVD 9. Renforcement des capacités SSES/UCP • Autres SSES • Consultants des acteurs en mise en œuvre • SPM • Structures publiques E&S • Bénéficiaires compétentes Audit de mise en œuvre des SSES/UCP • Autres SSES • Consultants 11. mesures E&S • SPM • S-SE • EN-EIE • Maires 9. Budget global estimatif prévu pour la mise en oeuvre du CGES Le budget estimatif prévu pour la mise en oeuvre du CGES s’élève à six cents vingt-cinq millions (625 000 000) de francs de FCFA. Activité du projet Impacts Mesures d’atténuation Responsabilité Echéancier Prévisions des environnementaux coûts (FCFA) et sociaux potentiels Exécution des Suivi de la mise mesures en œuvre des d’atténuation mesures Etudes à réaliser 01 EIES pour certains Recrutement des consultants UCP-PARIIS et SSES-PARIIS En cas de besoin 350 000 000 (01 EIES et 60 sous projets du pour réaliser les EIES et les MOD BM NIES) PARIIS dont NIES (y compris validation), y Consultants l’aménagement de compris inspection du barrage Dourou de Toécé Renforcement des Méconnaissances de Organiser des sessions et SSES-PARIIS, PFR Ateliers 35 000 000 capacités l’EIES et des enjeux ateliers de formation sur les BUNEE DREEVCC régionaux et de la gestion EIES/NIES communaux environnementale des 1ère année chantiers de travaux Mener des campagnes de SSES-PARIIS PFR Campagnes 20 000 000 sensibilisation ONGs DREEVCC annuelles (1ère année) Elaboration Absences clauses Clauses environnementales dans SSES-PARIIS PFR 1ème, 2ème et 3ème inclus dans le Clauses-types environnementales les DAO BUNEE année sous-projet DREEVCC BM Suivi de la qualité Mauvaise utilisation Appropriation des bonnes Producteurs SSES-PARIIS 2ème, 3ème et 4ème 35 000 000 des eaux des produits pratiques PFR année chimiques BUNEE Laboratoires Acteurs locaux et Agences de l’eau Suivi de la qualité Mauvaise utilisation Appropriation des bonnes Producteurs SSES-PARIIS 2ème, 3ème et 4ème 40 000 000 des sols des produits pratiques PFR année chimiques BUNEE Laboratoires Activité du projet Impacts Mesures d’atténuation Responsabilité Echéancier Prévisions des environnementaux coûts (FCFA) et sociaux potentiels Exécution des Suivi de la mise mesures en œuvre des d’atténuation mesures BUNASOLS Suivi écologique Mauvaise utilisation Appropriation des bonnes Producteurs SSES-PARIIS 3ème année 30 000 000 (faune et flore) des produits pratiques PFR chimiques BUNEE DGFF Reboisement de Destruction du Veiller à rendre disponibles les Entrepreneurs SSES-PARIIS 2ème, 3ème et 4ème 90 000 000 compensation couvert végétal plants et des terrains nécessaires PFR année (30 bosquets et BUNEE plantations DREECC d’alignement) Supervision Non application des Veiller au respect des mesures SSES-PARIIS BUNEE A mi-parcours 25 000 000 Suivi- évaluation mesures du CGES (convention BUNEE) Consultants PFR Fin d’année BUNEE SSE-PARIIS BM Total 625 000 000 10. Consultations publiques Dans le cadre de la préparation du CGES, des consultations ont été menées du 01 au 05 juillet 2016 auprès des populations locales dans les zones d’intervention du PARIIS-BF ainsi qu’au niveau des services techniques chargés de l’encadrement des producteurs (agriculture, élevage, environnement, etc.). Pour ce qui est des populations locales, les consultations se sont déroulées dans le village de Dourou (Commune de Kirsi/ Région du Nord), puis dans la région de la Boucle du Mouhoun à Lémini (commune de Bourasso) et Tiankuy (commune de Dédougou). Les principales préoccupations suivantes sont à retenir : - Forte attente des populations locales dans la distribution des parcelles aménagées pour la production irriguée ; - Faiblesse des capacités des producteurs (itinéraires techniques, dosage des engrais et des pesticides, techniques de confection des diguettes, etc.) ; - Inquiétudes quant au traitement des questions socioculturelles (tombes et sites sacrés) ; - Besoin d’infrastructures communautaires sur les sites de réinstallation le cas échéant, notamment les forages ; - Inquiétudes en matière de la compensation terre contre terre pour les PAP qui perdraient des terres agricoles. Quant aux services techniques chargés de l’encadrement des producteurs, les préoccupations suivantes ont été relevées : - Insuffisance d’information et d’implication dans les activités du projet et la mise en oeuvre des PGES ; - Faiblesse des capacités des agents des services déconcentrés de l’Etat en matière de sauvegarde environnementale et sociale ; - Prise en compte insuffisante des questions de protection des berges dans le cadre des projets. Ces consultations vont se poursuivre dans la phase de mise en oeuvre des sous-projets du PARIIS. 11. Conclusion Le contexte politique, institutionnel et juridique du secteur environnemental et des secteurs d’intervention du PARIIS est marqué par l’existence de documents de planification stratégiques ainsi que des textes pertinents au plan législatif et réglementaire. Toutefois, au niveau institutionnel, malgré les avancées significatives, des insuffisances sont notées en termes de capacités et de compétences pour la mise en oeuvre des mesures du PCGES. Pour mieux optimiser la mise en oeuvre du Plan Cadre de Gestion Environnementale et Sociale (PCGES) du PARIIS-BF, il a été défini des mesures d’atténuation, des normes environnementales, un programme de suivi et des recommandations détaillées concernant les arrangements institutionnels et un budget estimatif. Le présent CGES est complété par le Cadre de Politique de Réinstallation (CPR) et le Plan de Gestion des Pestes et Pesticides (PGPP). SFG2799 V6 Ministère de la Production, de l’Irrigation et des Equipements Agricoles PROJET D’APPUI REGIONAL A L’INITIATIVE POUR L’IRRIGATION AU SAHEL (PARIIS) ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK OF SIIP-CHAD EXECUTIVE SUMMARY IN ENGLISH AND FRENCH EXECUTIVE SUMMARY Context Six countries in the Sahel, including Burkina Faso, Mali, Mauritania, Niger, Senegal and Chad, are engaged in the preparation of the Regional Support for the Sahel Irrigation Initiative Project (SIIP) supported by the World Bank, following the High Level Conference on Irrigation in the Sahel held in Dakar on 31th October 2013. SIIP aims to "build capacity of stakeholders and increase the irrigated areas for the performance of irrigated systems in the six countries". It presents itself as a prelude to a wide-ranging commitment by the six countries of the CILSS and the International Community for the development of irrigated agriculture, with an ambitious objective of doubling the area under irrigation within a reasonable horizon of 5 in 10 years. The Project must comply with national environmental regulations and with the World Bank's Environmental and Social Safeguard Policies. This Environmental and Social Management Framework (ESMF) was established as part of this program for Chad. It aims to establish guidelines aimed at ensuring that the selection, evaluation and approval of sub-projects and their implementation conform to both socio- environmental national policies, laws and regulations as World Bank environmental safeguard policy. • Project description SIIP has a six-year duration and is structured into three components: (i) Component A: Modernization of the institutional framework and planning, will contribute directly to institutional strengthening (irrigation agencies, water user associations , local committees, etc.) and to improve the capacities in planning by developing institutional frameworks, tools and procedures. ; (ii) Component B: Financing of investment solutions in irrigation, will directly contribute to increasing irrigated areas by investing in the rehabilitation of degraded irrigated perimeters and the development of new developments in a results-based approach. ; (iii) Component C: Knowledge management and coordination, will contribute to the development objective through knowledge capitalization, strengthening of strong monitoring and evaluation systems and effective coordination of project activities at national and regional levels. The project envisages the revitalization and long-term management of existing irrigated systems on the one hand, and the development of new irrigated systems of small and medium size on the other. These activities could potentially generate social and environmental impacts. Although the sub-projects and land requirements are not yet known and identified at the current stage of project formulation, it is important to define the general measures envisaged for mitigation of impacts, monitoring and the institutional framework for management of environmental risks. At the regional level, an estimated 21,390 ha will benefit some 60,760 agricultural households in the six beneficiary countries; Most of which use Type 1, 2 and 3 agricultural systems. Approximately 6,300 ha will be of Type 1, 4,000 ha of type 2 and 1,280 ha of type 3. Major and critical environmental and social risks in the potential areas of intervention of the project The environmental and social aspects of the project depend on the areas (polders or plains) and the nature of the production (rice growing or market gardening) envisaged for the development. Indeed, the current environmental problems are: erosion in the eastern and central areas of Chad (Guéra, Batha, Salamat), scarcity of rains in the eastern zone, uncontrolled bush fires caused by agriculture slash and hunting in the East, Central, South and West areas. The social problems are centered on agropastoral conflicts and the poaching of wild animals in all the zones of the country, the incursion of the farmers in the national parks mainly in the South and West zones of the country. In the plains (Salamat), the issue of irrigation schemes would be mainly social and could be linked to agro-pastoral conflicts, particularly in the dry season, for off- season crops, where sheep farmers go down to the lowlands of the search for water and grazing for livestock. However, in the rainy season, no cases of agro-pastoral conflict on irrigation schemes can be recorded because rainfed crops occur when farmers have already left the plains. In the area of Logone and Chari, the issue of hydro-agricultural development concerns the risk of destruction of fishing activity, one of the main economic activities of the zone, due to the risk of draining rivers exploited. In the polders, the issue of hydro- agricultural development concerns the risk of destruction of aquatic fauna including hippopotamuses. • The legal and institutional framework for the country's environmental and social assessments and the Environmental and Social Operational Policies of the World The legal framework for environmental management in Chad is based on Law No. 14 / PR / 98 of 17 August 1998 defining the general principles of environmental protection, with its decrees. The main institution in charge of environmental and natural resource management is the Ministry of Environment and Fisheries (MEP), which includes the Direction of Environmental Assessment, Control and Pollution Control (DEELCPN). The DEELCPN covers two components, one on environmental assessments and the other on pollution (waste, etc.) and nuisance (noise, etc.). The DEELCPN will be strongly involved in monitoring of the implementation of all environmental aspects of project in the framework of its missions. On the field, the Ministry is represented at the level of each region by a Regional Delegation. These Regional Delegations will be involved in the close monitoring of the implementation of socio-environmental aspects in each intervention region of the project. The Project is classified as Category A (Full Assessment - Full Assessment) as its impact on the environment is likely to be significant. The environmental and social safeguard policies triggered by SIIP are as follows: OP 4.01 (Environmental Assessment), OP 4.04 (Natural Habitats), OP 4.09 (Pest Management), OP 7.50 (International Watercourse Projects), OP 4.37 (Dam Safety), OP 4.11 (Physical Cultural Resources) and OP 4.12 (Involuntary Resettlement of Populations). In addition, OP 4.07 on integrated water resources management is also triggered. Specific measures and actions are proposed in this ESMF and its related documents (CPR, PMP) to meet these requirements. • Potential type of impacts / risks of the proposed subprojects (a) Impacts related to the choice of perimeters to be developed: (i) Potential negative environmental impacst: Risk of increased degradation of natural resources located on the targeted perimeters if the sites are not chosen taking into account the availability thresholds of these resources. The risk of destruction of structure and texture of soils, as well as vegetation, could come from compaction by tractors. It could have a concentration of livestock and even wild animals around the water points developed with risks of destruction of the surrounding vegetation and soil erosion caused by animal trampling and extension of agricultural areas. The consequences are the difficult regeneration of the affected soils and the prolongation of the fallow period; (ii) Potential negative social impacts: Risk of conflicts related to the development of the perimeters would be important if the sites are not chosen in a consensual way with the beneficiaries and the host communities. (b) Impacts related to the completion of the work: (i) Potential negative environmental impacts: The work may result in a limited amount of work. The time of noise nuisance or dust emissions. At construction sites, access roads, earthworks and flattenings will result in the temporary removal of vegetation cover, compaction of soil and earth movements, etc. Companies will use borrow sites and quarries to obtain building materials; (ii) Potential negative social impacts: During the work, the installation of a foreign workforce recruited elsewhere by the company could create unfavorable relations with the communities and risks of spread of certain diseases including STIs and AIDS. (iii) Potential positive social impacts: Infrastructure construction and / or rehabilitation companies will offer unskilled temporary jobs to local populations, thus improving their incomes. (c) Impacts on water resources: (i) Potential positive environmental impacts: The development of irrigated perimeters constitutes a factor for the improvement of the water table in terms of water availability because they contribute to the recharge of the water table thanks to infiltration. Physically, these storm water storage structures will prevent gullies on slopes or areas of sharp dunes. Regulating runoff on trenches will promote infiltration and will prevent erosion and widening of trenches. Structural hydraulic arrangements may be necessary to secure drainage and flood protection and related infrastructure to facilitate market access (roads, storage, service buildings); (ii) Potential negative environmental impacts: Intensive exploitation of irrigated perimeters could lead to localized pollution of surface and ground water due to the intensive use of plant protection products and fertilizers. The risk of drying out of the surrounding watercourses and water points could be high if the samples are not checked and carried out reasonably; Which could affect fish stocks with consequences on fishing activity, particularly in the Logone and Chari area, flora and fauna, especially hippopotamuses in the polders, and rice production. (iii) Potential positive social impacts: Water availability will allow for off-season cultivation and thus increase agricultural production. (iv) Potential negative social impacts: Storage of water in irrigated perimeters over a longer period of the year may result in the development of mosquito larvae and other parasites that are harmful to human health. • Environmental and social management measures o Steering Committee: will be responsible for the: (i) Approval of the annual work plans and budgets of the safeguard measures prepared by the CU; (ii) Supervision of the overall socio-environmental performance of the project and strategic direction; (iii) Make the necessary adjustments to the project on the basis of the results of the monitoring and evaluation of the safeguard measures; (iv) Organization of an annual meeting with donor representatives at least once a year to ensure the proper coordination of rural development activities. The Steering Committee’s mission will be to provide a guiding framework for project activities; As such, it will be responsible for: - Informing partners on the environmental approach implemented within the framework of the project; - Consultation on the articulation of the project with the national environmental policy - The information on compliance with the predispositions mentioned in environmental clauses - The proposals for all decisions, measures or reforms to achieve the environmental objectives - The review and approval of plans of operations, budget and technical and financial implementation report on environmental matters o Project Coordination Unit (PCU): It will have overall responsibility for the implementation of this ESMF and the environmental and social safeguards and instruments relating to the project. It shall ensure that the certificates and permits required by the relevant national regulations are obtained before any action is taken. It reports to the Steering Committee on all due diligence and ensures that the Bank and other stakeholders receive all E & S monitoring reports. To this end, it has an environmental and social unit composed of two qualified specialists (01 specialist in environmental protection and 01 specialist in social safeguarding), whose specific tasks are summarized in Table 1 Matrix of roles and responsibilities o Agency / Directorate of Environment / Environmental Assessment (Agence/Direction de l’Environnement / Evaluation environnementale DEELCPN): The DEELCPN will be involved in the definition and monitoring of the project's environmental and social policy as members of the steering committee. It will ensure that these aspects are taken into account in the selection of sub-projects and in the implementation of the measures identified. The DEELCPN will be responsible for validating the EIA and NIE reports of the sub-projects. The role of the DEELCPN will be to bring the various stakeholders of the project to adopt a responsible behavior with respect to the environment with a view to ensuring its protection o Local authority (mayor, the local representative of the central authority (sous-préfet), etc.): Local authority consists of local elected representatives, sous-préfets, traditional chiefs and representatives of civil society. The managers of the departmental technical services, in particular the departmental ESMP monitoring committees and the communal managers, will be called upon to support the local communities in the implementation of the project activities. To this end, a major effort must be made to develop their capacities to ensure that environmental issues are taken into account in the development and implementation of ESMF o Beneficiary associations: The promoter of each sub-project will be responsible for filling the environmental and social form to ensure that these aspects are taken into account as soon as the sub-project is formulated. In the case of an EIA or a NIE, it will participate in the implementation of the safeguarding measures of its sub-project during its implementation. • Roles and responsibilities for the implementation of E & S management measures o Project Coordinator: The Project Coordinator will decide on the major strategic directions for the implementation of the project and the related implementation modalities. It will be responsible for assessing the impact of the project on the basis of the results of the monitoring and evaluation activities. It will approve the annual work plans and budgets and ensure that they are consistent with the project's development objective. Under the supervision of the steering committee, the project coordinator coordinates the project's Operational Unit. To this he - plans, organizes and directs all the activities necessary to achieve all the objectives of the project; - ensure that eligible activities contribute to the achievement of the project's objectives, while respecting the resources allocated; - ensures that the targets, budgets and deadlines established for the project are respected, and provides the expected reports and assessments; - develops, completes and finalizes all the documents to be delivered within the framework of the project, respecting the deadlines; - Communicate with beneficiary producer associations, including companies providing services; - Organizes the coordination meetings of the project, animates them and draws up the minutes; - Establishes links for concerted work and information sharing; - Mobilizes the key stakeholders mentioned in the project proposal to participate in the project; - Prepares the coordination document; - Develop an evaluation plan for the project; - Organizes and coordinates consultations and meetings; - Prepares information and other written materials in a timely manner to ensure the implementation of project o Environment Safeguards Specialist: At the regional level, Focal Points will be designated by the DEELCPN and will be responsible for monitoring the implementation by the promoters of the mitigation measures recommended in the EIAs and NIEs of the sub-projects. They will assist the sub-project promoters in filling the environmental and social selection form, in the choice of mitigation measures. Under the authority of the Coordinator, the Environmental Safeguard Specialist shall: - ensure that environmental safeguard documents (CGES, CPRP, ESMP, etc.) are properly disseminated to the actors involved in the implementation of the project from the outset; - carry out the environmental screening of the activities included in the project prior to their start- up and classify them into activities that: (i) are subject to environmental impact assessment, (ii) not subject to an environmental impact assessment but Recommendations for environmental measures or a simplified ESMP sheet; - draw up simplified ESMP worksheets for subprojects and ensure that measures are included in work execution plans; - ensure that the estimated Quantitative Quotation Tables of the Bidding Documents include the lines for the relevant environmental activities / products and / or indicate, where appropriate, clauses and provisions for the effective consideration of environmental measures in Tender documents and sub-project contracts; - coordinate environmental activities between the different implementation centers and project implementation partners; - helping to identify, where appropriate, (TDR drafting, selection, follow-up) the consultants for the preparation of the environmental impact studies of the sub-projects; - assist in obtaining due diligence of environmental compliance notices from the Minister of the Environment or the competent authority (environmental permit and environmental discharge) for sub-projects; - advising on the teaching materials and the technical conduct of any training workshops on environmental issues; - advocate operational measures to strengthen the environmental expertise of the Project Coordination; - help integrate the implementation of environmental activities into the overall implementation schedules for the sub-projects and activities concerned; - assess the overall implementation of published environmental safeguard documents; - analyze and give a reasoned opinion on the TORs and activity reports of the partners implementing the environmental measures of the project (companies, control offices, etc.), - ensure the implementation and follow-up of the partners' recommendations (steering committee, etc.) on environmental issues, - prepare quarterly reports on environmental monitoring (level of implementation, constraints, suggestions for solutions); These reports will feed into the "Implementation of Environmental. o Social Safeguards Specialist: Under the authority of the Coordinator, the social protection specialist will coordinate the local monitoring of social aspects. Apart from monitoring the implementation of the social aspects of this ESMF (accompanying health and social issues such as awareness raising on HIV / AIDS, malaria control, management of social conflicts, etc.) , This expert will be responsible for producing a manual on good social practices. He will have to - do negotiations to facilitate out-of-court settlements, - ensure that RAP is properly implemented, - adequately communicate social safeguard documents (PAR, etc.) to the actors involved in the implementation of the project from the start, - prepare quarterly reports on social monitoring (level of implementation, constraints, suggestions for solutions); These reports will feed into the section "Implementation of social safeguard measures" of the overall progress report of the Project. o Technical manager of the eligible activity: The main task of the technical manager is to coordinate all the eligible technical activity. This means he will - supervise and lead a team of technical consultants; - manage relations with partners and companies; - guarantee the supervision and technical maintenance of the eligible activity; - advising, informing and coordinating the production and technical development of the eligible activity; - ensure the technical coordination of the implementation of the eligible activity while respecting quality, hygiene, safety and environmental constraints; - put in place procedures to improve the efficiency of the work of the eligible activity ; o Procurement Specialist: Under the authority of the Project Coordinator, the Procurement Officer will provide expert advice to the Project Coordinator and the subproject executing agencies on all matters relating to procurement. Procurement and execution of contracts. Specifically and without limitation, the Procurement Specialist will assume the following responsibilities: - Prepare procurement plans for individual projects; - Ensure, with the beneficiary technical services, the preparation and finalization of the terms of reference (TOR) for the selection of consultants and technical specifications for the procurement of goods and works; - develop bidding documents, requests for proposals, quotes requests; - develop and proceed with the launching of: (i) Notice of Expression of Interest (AMI), (ii) prequalification notice and (iii) call for tender notice in accordance with donor procedures; - prepare, organize and participate in bids opening and bid evaluation sessions; - draw up the tender opening minutes and tender evaluation reports and obtain, if required, the notice of no objection from the lessor; - ensure the preparation and finalization of contracts, contracts, agreements after obtaining the notice of no objection of the lessor if required, and ensure their signature - ensure publication of the results of calls for tenders in the required media and deadlines and ensure that bidders not retained in the procurement process receive the necessary information; - ensure compliance with donor procurement procedures and national procedures; - contribute to the preparation of the financial monitoring reports and the progress reports on the award of contracts; - ensure the filing and archiving of procurement files which will include for each contract all documents relating to this contract including documents relating to payments, with a view to allowing any retrospective review of the donors; - ensure the handling of complaints received in connection with the award of contracts; - developing mechanisms for monitoring contract performance and management statistics that will enable donors to measure the level of performance of the procurement team; - ensure the updating of the Enterprise Data Base; - carry out any tasks or tasks related to procurement assigned by the Project Coordinator o Finance Manager: It coordinates and oversees the accounting, treasury, fund management, and proposes a short, medium and long term financial policy. It is under the responsibility of the Project Coordinator. It finalizes the budgets of the sub-projects and adapts them to the perimeter of the activity. It constantly informs the Coordination on financial health and also handles external financial information to donors. He oversees management control, treasury and accounting. It collaborates constantly with all services and in the case of a negotiation, it can represent or assist the Coordinator documents and analyzes in support. o Monitoring and evaluation specialist: The M & E specialist will be responsible for ensuring the effective and efficient implementation of project monitoring and evaluation, capitalization and learning activities. For this purpose, he - ensures the day-to-day management of the M & E system; - participates in the supervision of the implementation of the environmental measures defined for the implementation of the sub-projects by the specialist in environmental and social safeguarding and evaluates their performance in concert with its employees; - identifies difficulties encountered in the preparation, execution of sub-projects and participates in the implementation of corrective measures; - participates in the assessment of needs and capacity building of staff and implementing partners; - report periodically to the Project Coordinator on the progress of the activities carried out by the different actors involved in the implementation of the subprojects; - ensure the regularity of the technical reports of field staff and sub-project implementation partners; - exploits the reports submitted by the partners and the field staff and participates in the feedbacks in collaboration with the specialist in environmental and social safeguard; - participates in the preparation of technical coordination meetings; - participates in the monitoring and evaluation of programmatic performance and that of the technical staff under its supervision; - with the collaboration of the environmental and social safeguard specialist, it consolidates the monthly, quarterly, semi-annual and annual reports of field staff and implementing partners, analyzes gaps and ensures that corrective measures are implemented; - participates in the preparation of budgets and performance reports (technical and financial), the periodic analysis of variances and the correction of changes if necessary; - supervises and accompanies collaborators and implementing partners in the execution of short, medium and long-term activities; - supports the organization of field missions of supervision, monitoring and control of the actors involved in the implementation of the subprojects; o Construction companies: They respond to calls for tenders to intervene at the operational level. They may be responsible for the execution of activities selected under the project and subprojects. They are also either responsible for the supervision of the works to be carried out or responsible for carrying out the environmental studies (EIA and NE) prior to the implementation of these activities. After contracting by the procurement specialist, the contractors will implement the measures contained in the environmental and social management plans (ESMPs) of the works for which they are responsible on the basis of the subproject ESMP. They must have an environmental specialist responsible for the implementation of the ESMP. o Controller of works / construction companies: Under the supervision of the Project Coordinator, the Controller will be on-site full time to monitor and control the execution of the work. It controls legal, technical and all aspects of environmental conservation standards and measures. It is required to bring its expertise and to report irregularities in the course of the work, making the interface between the different companies of the project and the beneficiaries. It prepares and submits to the Coordinator the Progress Reports of all works. Table 1: Matrix of Roles and Responsibilities (with respect to the Institutional Arrangement for the Implementation of the ESMF No Steps/Activities Responsibility Support/collaborati Service provider on 1. Identification of the location / Operational Unit • Beneficiaries, • Construction site and main technical • Technical companies characteristics of the sub- manager of eligible • Construction project (Do the E & S activities, companies screening) • Environmental and Social Safeguards Specialists of the PCU Environmental Screening Environmental and • Beneficiaries; Consulting firm 2. (filling of forms), and Social Safeguards • Local authorities determination of the type of Specialists of the PCU Environmental and safeguard instrument to use Social Safeguards (ESIA, RAP, IPP, Audit E & Specialists of the S, AS, etc.) PCU 3. Approval of the safeguard Project Coordinator Environmental and • National Entity category classification by Social Safeguards responsible for the the entity responsible for the Specialists of the Environmental Impact Environmental Impact Study PCU Study World Bank the Bank 4.1. Preparation of the safeguard instruments E&S of category A subj-project Preparation, approval and EN-EIE World Bank publication of the ToRs Conduct of the study Procurement Consultant including public consultation Specialist ; National Entity responsible for the Environmental Environmental and Impact Study ; Social Safeguards Mayor ; Specialists of the PCU Approval of the document PS, Local authority • National Entity and obtaining the responsible for the environmental certificate Environmental Impact Study , • World Bank Publication of the document Project Coordinator • Media ; • World Bank 4.2. Preparation of the safeguard instruments E&S of categories B or C subj-projects Preparation, approval and Environmental and World Bank publication of the ToRs Social Safeguards Conduct of the study Specialists of the PCU Procurement Consultant including public consultation Specialist ,; National Entity responsible for the Environmental Impact Study ; Local authority Approval of the document Procurement • National Entity and obtaining the Specialist ,; responsible for the environmental certificate National Entity Environmental Impact responsible for the Study , Environmental World Bank Impact Study ; Local authority Publication of the document Project Coordinator • Media ; • World Bank Integration in the call for • Environmental 5. proposals of the subproject, Technical manager of and Social all the safeguard measures eligible activities Safeguards applicable to the phases of Specialists of the the works to be contracted PCU with the construction Procurement company; (Ii) approval of the Specialist ESMP undertaken implementation of safeguard Environmental and • Procurement • Consultant 6. measures not contracted Social Safeguards Specialist Technical • NGO Specialists of the PCU Manager • Others with the construction • Finance company Manager Local authority Internal monitoring of Environmental and • M&E Specialist Control Office the implementation of E Social Safeguards • Finance 7. & S measures Specialists of the PCU Manager Local authority Dissemination of internal Project Coordinator Environmental and monitoring report Social Safeguards Specialists of the PCU External monitoring of the National Entity Environmental and implementation of E & S responsible for the Social Safeguards measures Environmental Impact Specialists of the Study PCU 8. Environmental and social Environmental and • Others • Laboratories safeguards monitoring Social Safeguards Environmental and /Specialized centers Specialists of the PCU Social Safeguards • NGO Specialists S-SE 9. Strengthening the capacities Environmental and • Others • Consultants of stakeholders in E & S Social Safeguards Environmental and • Competent public implementation Specialists of the PCU Social Safeguards structures Specialists of the PCU Procurement Specialist Audit of implementation of E Environmental and • Others • Consultants 11. & S measures Social Safeguards Environmental and Environmental Specialists of the PCU Social Safeguards Specialists of the • PCU • Procurement Specialist • S-SE National Entity responsible for the Environmental Impact Study Local authority The roles and responsibilities as described above will be incorporated into the Project Implementation Manual (PIM). • Key indicators for the implementation of the ESMF The main indicators for the implementation of the ESMF are: Presence of an environmental and social Specialist in the project implementation unit, number of EIAs and NIEs carried out, number of internal monitoring missions, number of supervision missions of the World Bank, Number of information, awareness-raising and training sessions organized. • Organizational framework for the efficient implementation of measures Implementation of the socio-environmental activities will be carried out by the recipient producer organizations and the service providers of the project. The internal monitoring of the implementation of socio-environmental activities will be carried out by the Project implementation unit through an Environmental and Social Specialist recruited on a call for applications for this purpose. External monitoring will be carried out by the relevant ministries under the coordination of the DEEPLCN of the Ministry in charge of the environment. Two environmental audits will be carried out, one at the middle of the third year and one at the mid of the sixth year of implementation of the project. These audits will be carried out by external consultants recruited for this purpose. The two Washington-based World Bank experts, one environmental and one social, will oversee the implementation of project safeguards. • Estimated overall budget for the implementation of all environmental and social safeguards The overall budget for implementation of the ESMF incorporates the costs of capacity building, information, awareness and monitoring. This budget is estimated at 652,050,000 CFA francs, ie 1,185,545 US dollars. Unit Price Category Expenditure Unit Quantity Total cost (FCFA) (FCFA) Provision for Type of EIE 3 50 000 000 150 000 000 environmental and irrigation social Type of NIE 3 25 000 000 75 000 000 assessments irrigation Capacity building for sub- project promoters and Annual 6 30 000 000 180 000 000 providers of proposed investment projects Training and Strengthening the capacity of capacity building the RES and the PCU project managers, including those Annual 6 5 000 000 30 000 000 responsible for the associated technical services (DEAFPR, ONDR, DEELCPN) Preparation of awareness- Awareness raising raising materials (pamphlets, Flate rate 1 50 000 000 50 000 000 plaques, etc.) PM car déjà pris en compte dans le coût de Internal monitoring Annual 6 PM fonctionnement du Monitoring projet External monitoring by Annual 6 6 000 000 36 000 000 DEELCPN Évaluation à mi-parcours Flat rate 1 50 000 000 50 000 000 Evaluation Évaluation finale Flat rate 1 50 000 000 50 000 000 TOTAL COST 621 000 000 Contingency 5% 31 050 000 TOTAL BUDGET FOR IMPLEMENTATION OF THE ESMF 652 050 000 • Consultations The development of this framework followed a participatory process which required consultation of stakeholders from 22 to 28 August 2016 both in the central administrations in N'Djamena and on the field in Douguia and with the beneficiaries in the locality of Ambedane . The stakeholder groups encountered included central governments, producer support associations, NGOs and producer groups. The aim of this consultation was to obtain the views of the various stakeholders on the project, including their expectations, fears, potential environmental and social impacts of the project, possible mitigation measures for the project, mechanisms for involvement of producers in the implementation of the project. Discussions and inquiries have taken place with the resource persons of the administrations concerned and producer groups; Which made it possible to collect the information necessary for the consolidation of this document. A minute was written at the end of each interview and a summary of the exchanges carried out was made at the end of the public consultations. • Additional documents to ESMF This Environmental and Social Management Framework (ESMF) is accompanied by three additional documents, namely the Pesticide Management Plan and the Resettlement Policy Framework. Environmental assessments, including environmental and social impact assessments and environmental impact statements, will be developed during the implementation of activities, depending on the scope of the sub-projects concerned. The major recommendations of CGES are: (i) to identify and assess the environmental and socio-economic impacts generated at mid-term and at the end of the intervention; (ii) organize communications on the environmental and social aspects of the project; (iii) supporting the beneficiaries in terms of training, advisory support and awareness raising. Consideration of the recommendations contained in this document will reduce the potential negative impacts and environmental issues that could arise from the implementation of the project. The participatory approach with local populations and producers and all those involved in the irrigated agriculture chain throughout the process would be the key to the success of the project in achieving its objectives. In the same way, awareness-raising, communication and information campaigns according to available means must be planned during the whole period of the intervention, in order to increase acceptance by the beneficiaries of the standards of respect for the environment and its sustainable management. RESUME EXECUTIF • Contexte Six pays du Sahel incluant le Burkina Faso, le Mali, la Mauritanie, le Niger, le Sénégal et le Tchad, sont engagés dans la préparation du Projet d’appui régional à l’Initiative pour l’irrigation au Sahel (PARIIS) avec l’appui de la Banque mondiale, suite à la Conférence de Haut Niveau sur l’irrigation au Sahel tenue à Dakar le 31 octobre 2013. Le PARIIS vise à « renforcer les capacités des parties prenantes et accroitre les superficies irriguées pour la performance des systèmes irriguées dans les six pays ». Il se présente comme le prélude à un vaste mouvement d’engagement des six pays du CILSS et de la Communauté internationale en faveur du développement de l’agriculture irriguée, avec un objectif ambitieu x de doublement des superficies sous- irrigation dans un horizon raisonnable de 5 à 10 ans. Le Projet doit se conformer aux exigences nationales et aux Politiques de sauvegarde environnementale et sociale de la Banque mondiale ; d’où la nécessité pour le Tchad, de préparer un Cadre de Gestion Environnementale et Sociale (CGES) pour le PARIIS. Il a pour but d’établir des directives visant à assurer que la sélection, l’évaluation et l’approbation des sous-projets et leur mise en œuvre soient conformes tant aux politiques, lois et réglementations socio-environnementales nationales ainsi qu’aux exigences des politiques de sauvegarde environnementale et sociale de la Banque mondiale. • Description du projet Le PARIIS a une durée de six ans, et est structurée en trois composantes dont : (i) Composante A : Modernisation du cadre institutionnel et de la planification, contribuera directement au renforcement institutionnel (agences d'irrigation, associations des usagers de l'eau, comités locaux, etc.) et à l’améliorati on des capacités en planification en élaborant des cadres institutionnels, des outils et des procédures. ; (ii) Composante B : Financement de solutions d'investissement dans l'irrigation, contribuera directement à augmenter les superficies irriguées grâce à des investissements dans la réhabilitation des périmètres irrigués dégradés et le développement de nouveaux aménagements dans une approche axée sur les résultats. ; (iii) Composante C : Gestion des connaissances et coordination, contribuera à l’objectif de développement par la capitalisation des connaissances, le renforcement de systèmes de suivi-évaluation solides et une coordination efficace des activités du projet aux niveaux national et régional. Le projet envisage la revitalisation et la gestion pé renne des systèmes irrigués existants d’une part, et le développement de nouveaux systèmes irrigués de petite et moyenne taille d’autre part. Ces activités pourraient éventuellement générer des impacts sociaux et environnementaux. Bien que les sous-projets et les besoins en terres ne soient pas encore connus et identifiés au stade actuel de formulation du projet, il importe de définir les mesures de portée générale envisagées pour la mitigation des impacts, la surveillance et le cadre institutionnel de gestion des risques environnementaux. Au niveau régional, on estime que l'aménagement de 21 390 ha profitera à environ 60 760 ménages paysans dans les six pays bénéficiaires ; la plupart utilisant les systèmes agricoles des types 1, 2 et 3. Environ 6 300 ha seront de type 1, 4 000 ha de type 2 et 1 280 ha de type 3. • Enjeux et risques environnementaux et sociaux majeurs ou critiques des zones potentielles d’implantation des sous-projets Les enjeux environnementaux et sociaux du projet sont fonction des zones (polders ou plaines) et de la nature de la production (riziculture ou maraîchage) envisagées pour les aménagements. En effet, les problèmes environnementaux actuels sont les suivants : l’érosion dans les zones Est et Centrale du Tchad (Guéra, Batha, Salamat), la rareté des pluies dans la zone Est, les feux de brousse non contrôlés causés par l’agriculture sur brûlis et les activités de chasse dans les zones Est, Centrale, Sud et Ouest. Les problèmes sociaux sont centrés sur les conflits agropastoraux et le braconnage d’animaux sauvages dans toutes les zones du pays, l’incursion des agriculteurs dans les parcs nationaux principalement dans la zone Sud et Ouest du pays. Dans les plaines (Salamat), l’enjeu des aménagements hydro-agricoles serait essentiellement social et pourrait être lié aux conflits agro-pastoraux notamment en saison sèche pour les cultures de contre-saison, période où les éleveurs / pasteurs descendent dans les plaines à la recherche de l’eau et du pâturage pour le bétail. Par contre en saiso n des pluies, aucun cas de conflit agro-pastoraux sur les aménagements hydro-agricoles ne peut être enregistré car les cultures pluviales interviennent quand les éleveurs ont déjà quitté les plaines. Dans la zone du Logone et Chari, l’enjeu des aménagements hydro- agricoles porte sur le risque de destruction de l’activité de pêche, une des principales activités économiques de la zone, du fait du risque d’assèchement des cours d’eau exploités. Dans les polders, l’enjeu des aménagements hydro-agricoles porte sur le risque de destruction de faune aquatique notamment les hippopotames. • Cadre juridique et institutionnel des évaluations environnementale et sociale du pays et politiques opérationnelles de la Banque mondiale déclenchées par le projet Le cadre juridique de la gestion environnementale au Tchad repose sur Loi n°14/PR/98 du 17 août 1998 définissant les principes généraux de protection de l’environnement, avec ses décrets et arrêtés. La principale institution en charge de gestion de l’environnement et des ressources naturelles est le Ministère en charge de l’environnement et des pêches (MEP) qui comprend la Direction des évaluations environnementales, de lutte contre les pollutions et des nuisances (DEELCPN). La DEELCPN couvre deux volets dont un sur les évaluations environnementales, et l’autre sur les pollutions (déchets, etc.) et les nuisances (sonores, etc.). La DEELCPN sera fortement impliquée dans le suivi de la mise de la mise en œuvre de tous les aspects environnementaux du PARIIS dans le cadre de ses missions régaliennes. Sur le terrain, le Ministère est représenté au niveau de chaque région par une Délégation Régionale. Ces Délégations régionales seront impliquées dans le suivi de proximité de la mise en œuvre des aspects so cio- environnementaux dans chaque région d’intervention du PARIIS. Le Projet est classé en Catégorie A (Evaluation complète - Full assessment) étant donné que son impact sur l’environnement risque d’être important. Les politiques de sauvegarde environneme ntale et sociale déclenchées dans le cadre du PARIIS sont les suivantes : OP 4.01 (Évaluation environnementale), OP 4.04 (Habitats Naturels), OP 4.09 (Lutte antiparasitaire), OP 7.50 (Projets relatifs aux voies d’eau internationales), OP 4.37 (Sécurité des barrages), OP 4.11 (Ressources culturelles physiques) et OP 4.12 (Réinstallation involontaires des populations). Par ailleurs, la PO 4.07 relative à la gestion intégrée des ressources en eau est également déclenchée. Des mesures et actions spécifiques sont proposées dans le présent CGES et dans ses documents annexes (CPR, PGPP) pour répondre à ces exigences. • Impacts et risques génériques potentiels du projet (a) Impacts liés au choix des périmètres à aménager : (i) Impacts environnementaux négatifs potentiels: Risque de renforcement de dégradation des ressources naturelles situées sur les périmètres visés si les sites ne sont pas choisis en tenant compte des seuils de disponibilité de ces ressources. Le risque de destruction de la structure et la texture des sols, ainsi que de la végétation, pourrait provenir du compactage par les tracteurs. Il pourrait avoir une concentration du bétail et même des animaux sauvages autour des points d’eau aménagés avec risques de destruction de la végétation environnantes et d’érosion des sols causés par les piétinements des bêtes et l’extension des superficies agricoles. Les conséquences étant la régénération difficile des sols affectés et la prolongation de la durée de la jachère ; (ii) Impacts sociaux négatifs potentiels : Risque de conflits liés à l’aménagement des périmètres seraient importants si les sites ne sont pas choisis de manière consensuelle avec les bénéficiaires et les communautés d’accueil. Cette implantation pourrait également entrainer un déplacement de population, la restriction d’accès à des biens ou à des moyens de vie. (b) Impacts liés à la réalisation des travaux : (i) Impacts environnementaux négatifs potentiels : Les travaux pourront provoquer de façon limitée dans le temps des nuisances sonores ou des émissions de poussières. A l’exécution des chantiers, l’aménagement de voies d’accès, les terrassements et aplanissements vont se traduire par l’enlèvement temporaire du couvert végétal, le compac tage des sols et les mouvements de terre, etc. Les entreprises utiliseront des sites d’emprunt et les carrières pour obtenir des matériaux de construction ; (ii) Impacts sociaux négatifs potentiels : Lors des travaux, l’installation d’une main d’œuvre étrangère recrutée ailleurs par l’entreprise pourrait susciter des relations heurtées avec les communautés et des risques de propagation de certaines maladies dont les IST et le SIDA. (iii) Impacts sociaux positifs potentiels: Les entreprises de construction et/ou de réhabilitation des infrastructures offriront des emplois temporaires non qualifiés aux populations locales qui verront ainsi leurs revenus améliorés. (c) Impacts sur les ressources en eau : (i) Impacts environnementaux positifs potentiels : L’aménagement des périmètres irrigués constitue un facteur d’amélioration de la nappe phréatique en termes de disponibilité en eau car ils contribuent à la recharge de la nappe phréatique grâce à l’infiltration. Au plan physique, ces ouvrages de stockage des eaux de ruissellement permettront de prévenir les ravinements sur les pentes ou des zones de dunes vives. La régulation de l’écoulement sur les tranchées favorisera l’infiltration et préviendra les risques d’érosion et l’élargissement des tranchées. Des aménagements hydrauliques structurants peuvent s’avérer nécessaires pour sécuriser le drainage et la protection contre les inondations et des infrastructures connexes permettant de faciliter l’accès au marché (routes, stockage, bâtiments de services) ; (ii) Impacts environnementaux négatifs potentiels : L’exploitation intensive des périmètres irrigués pourrait engendrer une pollution localisée des eaux de surface et souterraines liée à l’utilisation intensive des produits phytosanitaires et des engrais. Le risque d’assèchement des cours et points d’eau environnants pourrait être élevé si les prélèvements ne sont pas contrôlés et effectués de façon raisonnée ; ce qui pourrait affecter les ressources halieutiques avec les conséquences sur l’activité de pêche notamment dans la zone du Logone et Chari, la flore et la faune aquatique notamment les hippopotames dans les polders, la production rizicole. (iii) Impacts sociaux positifs potentiels : La disponibilité de l’eau permettra la culture de contre saison et entrainera ainsi l’augmentation de la production agricole. (iv) Impacts sociaux négatifs potentiels : Le stockage d’eau dans les périmètres irrigués sur une période plus longue dans l’année peut entraîner le développement de larves de moustiques et d’autres parasites nuisibles à la santé de l’homme. • Arrangements institutionnels pour la mise en œuvre du CGES o Comité de pilotage du projet (CoPil) : Le CoPil sera responsable des tâches suivantes : (i) approbation des plans de travail et budgets annuels des mesures de sauvegarde préparés par l’UCP; (ii) supervision de la performance socio-environnementale globale du projet et orientation stratégique; (iii) ajustements nécessaires au projet sur la base des résultats du suivi-évaluation des mesures de sauvegarde.(iv) Il organisera au moins une fois par an une rencontre annuelle avec les représentants des bailleurs de fonds pour garantir la bonne coordination des activités de développement rural. Il aura pour mission de servir de cadre d’orientation des activités du projet ; à ce titre, il servira de cadre : - d’information des partenaires sur l’approche environnementale mise en œuvre dans le cadre du projet ; - de concertation sur l’articulation du projet avec la politique environnementale nationale ; - d’information sur le respect des prédispositions évoquées dans les clauses environnementales ; - de proposition de toutes les décisions, mesures ou réformes propres à atteindre les objectifs environnementaux ; - d’examen et d’approbation des plans d’opérations, budget et compte -rendu d’exécution technique et financière en matière environnementale o Unité de mis en œuvre du projet (UP) : Elle aura la responsabilité globale de la mise en œuvre du présent CGES et des instruments et autres mesures de sauvegarde environnementale et sociale relatives au projet. Elle assure, la préparation desdits documents, l’obtention des certificats et permis requis par les réglementations nationales pertinentes avant toute action. Elle rend compte au comité de pilotage de toutes les diligences, et assure que la Banque et les autres acteurs reçoivent tous les rapports de surveillance E&S. A cette fin, elle dispose d’unité environnementale et sociale composée de deux spécialistes qualifiés (01 spécialiste en sauvegarde environnementale et 01 spécialiste en sauvegarde sociale), dont les missions spécifiques sont résumées dans le tableau 1 Matrice des rôles et responsabilités. o .Agence/Direction de l’Environnement / Evaluation environnementale (DEELCPN): La DEELCPN sera associée à la définition et au suivi de la politique environnementale et sociale du projet en tant que membres du comité de pilotage. Elle veillera à la prise en compte de ces aspects dans la sélection des sous projets et dans la mise en œuvre des mesures identifiées. La DEELCPN sera chargé de valider les rapports d’EIE et de NIE des sous projets. Le rôle de la DEELCPN sera d’amener les différents intervenants du projet à adopter un compor tement responsable vis-à-vis de l’environnement en vue d’en assurer la protection o .Autorité locale (maire, sous-préfet, etc) : Autorité locale est constituée des élus locaux, des sous-préfets, des chefs traditionnelles, et des représentants de la société civile. Les cadres des services techniques départementaux notamment les comités départementaux de suivi des PGES et les cadres communaux seront appelés à appuyer les communautés locales dans la mise en œuvre des activités du projet. A cet effet, un effort important doit être apporté pour le développement de leurs capacités afin de leur permettre de s’assurer de la prise en compte des questions environnementales dans l’élaboration et la mise en œuvre CGES o Associations de producteurs bénéficiaires : Le promoteur de chaque sous projet sera chargé du remplissage du formulaire environnemental et social en vue d’assurer la prise en compte de ces aspects dès la formulation du sous projet. En cas de réalisation d’une EIE ou d’une NIE, Il participera à la mise en œuvre des mesures de sauvegarde de son sous projet pendant sa réalisation • Rôles et responsabilités pour la mise en œuvre des mesures de gestion E&S o Coordonnateur du projet : Le Coordonnateur du projet décidera des grandes orientations stratégiques pour la mise en œuvre du projet et des modalités d’exécution y relatives. Il sera chargé d’évaluer l’impact du projet sur la base des résultats des activités de suivi -évaluation. Il approuvera les plans de travail et budgets annuels et veillera à ce qu’il s soient conformes à l’objectif de développement du projet. Sous la supervisons du comité de pilotage, le coordonnateur de projet coordonne l’Unité Opérationnelle du projet. A cet effet il - planifie, organise et dirige toutes les activités nécessaires pour atteindre tous les objectifs du projet; - fait en sorte que les activités éligible contribuent à l’atteinte des objectifs du projet et cela en respectant les ressources allouées; - fait en sorte que soient respectés les cibles, les budgets et les délais établis pour le projet, et fournis les rapports et évaluations prévus; - développe, complète et finalise tous les documents à livrer dans le cadre du projet, en respectant les délais ; - Communiquer avec les associations producteurs bénéficiaires, y les entreprises prestataires ; - Organise les réunions de coordination du projet, les animer et en rédige le procès-verbal ; - Établit des liens pour un travail concerté et le partage d’information ; - Mobilise les intervenants clés mentionnés dans la proposition de projet afin qu’ils participent au projet ; - Prépare le document de coordination; - Élabore pour le projet un plan d’évaluation ; - Organise et coordonne les consultations et les rencontres ; - Prépare en temps opportun l’information et les autres documents écrits afin d’assurer la mise en œuvre des activités des projets. o Spécialiste Sauvegarde Environnementale: Au niveau régional, des Points Focaux seront désignés par la DEELCPN, et seront chargés d’assurer le suivi de la mise en œuvre par les promoteurs des mesures d’atténuation préconisées dans les EIE et les NIE des sous-projets. Ils assisteront les promoteurs des sous projets dans le remplissage du formulaire de sélection environnementale et sociale, dans le choix des mesures d’atténuation. Sous l'autorité du Coordonnateur, le spécialiste en sauvegarde environnementale devra: - assurer la diffusion adéquate des documents de sauvegarde environnementale (CGES, CPRP, PGES, etc.) aux acteurs impliqués dans la mise en œuvre du projet dès son démarrage; - réaliser le screening (tri) environnemental des activités inscrites dans le projet avant leur démarrage et les classer en activités faisant : (i) sujet à étude d’impact environnemental, (ii) non assujetti à une étude d’impact environnemental mais pouvant faire l’objet de recommandations des mesures environnementales ou d’une fiche PGES simplifiée; - rédiger les fiches PGES simplifiées des sous-projets et veiller à l’inclusion des mesures dans les plans d’exécution des travaux ; - assurer que les tableaux de devis quantitatif estima tif des Dossier d’Appels d’Offre comportent les lignes pour les activités/produits environnementaux adéquats et/ou indiquer, le cas échéant, les clauses et dispositions visant une prise en compte effective des mesures environnementales dans les documents d’appel d’offre et les contrats des sous-projets; - coordonner les activités liées à l’environnement entre les différents centres d’exécution et partenaires de mise en œuvre du projet ; - aider à identifier le cas échéant, (rédaction TDR, sélection, suivi) les consultants pour la préparation des études d’impacts environnementaux des sous projets; - aider à l’obtention diligente des avis de conformité environnementale du Ministre chargé de l’environnement ou de l'administration compétente (permis environnemental et quitus environnemental) pour les sous projets; - conseiller sur le matériel pédagogique et la conduite technique des éventuels ateliers de formation sur les questions environnementales; - préconiser des mesures opérationnelles de renforcement de l’expertise e nvironnementale de la Coordination du Projet ; - aider à l’intégration de la mise en œuvre des activités environnementales dans les calendriers globaux d’exécution des sous projets et activités concernées ; - évaluer la mise en œuvre globale des documents de sauvegarde environnementale publiés; - analyser et donner un avis motivé sur les TDR et rapports d'activités des partenaires de mise en œuvre des mesures environnementales du projet (entreprises, bureaux de contrôle, etc.), - veiller à la mise en œuvre et au suivi des recommandations des partenaires (comité de pilotage, etc.) relatives aux questions environnementales, - produire des rapports trimestriels sur le suivi environnemental (niveau d’exécution, contraintes, suggestions de solutions); ces rapports serviront à alimenter la section ‘’Mise en œuvre des mesures de sauvegarde environnementale’’ du rapport périodique global d’avancement du Projet. o Spécialiste en sauvegarde sociale : Sous l'autorité du Coordonnateur, le spécialiste en sauvegarde sociale va assurer la coordination du suivi local des aspects sociaux. En dehors du suivi de la mise en œuvre des aspect sociaux du présent CGES (d’accompagnement d’ordre sanitaire et social tels que la sensibilisation sur le VIH/SIDA, la lutte contre le paludisme, gestion des conflits sociaux, etc..), cet expert sera chargé de réaliser un manuel sur les bonnes pratiques sociales. Il devra - conduire les négociations pour faciliter les règlements a l’amiable des situations conflictuelles - veiller à l’exécution conforme du PAR - communiquer de manière adéquate des documents de sauvegarde sociale (PAR, etc.) aux acteurs impliqués dans la mise en œuvre du projet dès son démarrage - produire des rapports trimestriels sur le suivi social (niveau d’exécution, contraintes, suggestions de solutions); ces rapports serviront à alimenter la section ‘’Mise en œuvre des mesures de sauvegarde sociale’’ du rapport périodique global d’avancement du Projet o Responsable technique de l’activité éligible : Le responsable technique a pour mission principale de coordonner l'ensemble de l'activité technique éligible. Cela revoit à : - encadrer et animer une équipe de consultants techniques ; - gérer les relations avec les partenaires et les entreprises ; - garantir l'encadrement et la maintenance technique de l’activité éligible ; - conseiller, informer et coordonner la production et le développement technique de l’activité éligible ; - assurer la coordination technique de la mise en œuvre de l’activité éligible en respectant les contraintes qualité, hygiène, sécurité et environnement ; - mettre en place des procédures pour améliorer l'efficacité des travaux de l’activité éligible ; o Spécialiste en passation de marchés : Sous l’autorité du Coordonnateur du projet, la mission du Spécialiste en Passation des Marchés consistera à apporter des conseils avisés au Coordonnateur du Projet et aux agences d’exécution des sous-projets, sur toutes les questions relatives à la passation et l’exécution des marchés. De manière spécifique et non limitative, le Spécialiste en Passation des Marchés assumera les responsabilités suivantes : - élaborer les plans de passation des marchés des différents projets ; - assurer, auprès des services techniques bénéficiaires, le suivi de la préparation et la finalisation des termes de référence (TDR) pour la sélection des consultants et des spécifications techniques pour l’acquisition des biens et travaux ; - élaborer les dossiers d'appel d'offres, les demandes de propositions, les demandes de cotations; - élaborer et procéder au lancement des : (i) avis à manifestation d'intérêt (AMI), (ii) avis de présélection et (iii) avis d’appel d’offres conformément aux procédures du bailleur de fonds ; - préparer, organiser et participer aux séances d'ouverture des plis et d’évaluation des offres ; - rédiger les procès-verbaux d'ouverture des plis et des rapports d'évaluation des offres et obtenir, si requis, l’avis de non objection du bailleur ; - assurer la préparation et la finalisation des marchés, contrats, conventions après l’obtention de l’avis de non objection du bailleur si cela est requis, et veiller à leur signature et approbation par les personnes habilitées ; - assurer la publication des résultats des appels d’offres dans les supports et délais prescrits et s’assurer que les soumissionnaires non retenus lors des processus de passation des marchés reçoivent les informations nécessaires ; - veiller au respect des procédures de passation des marchés des bailleurs et des procédures nationales ; - contribuer à la rédaction des rapports de suivi financier et des rapports d’activités de la passation des marchés ; - veiller au classement et à l’archivage des dossiers de passation des marchés qui inclura pour chaque marché tous les documents relatifs à ce marché y compris les documents relatifs aux paiements, en vue de permettre toute revue a posteriori des bailleurs ; - assurer le traitement des plaintes reçues en rapport avec la passation des marchés ; - développer des mécanismes de suivi de l’exécution des marchés et des statistiques de gestion qui permettront aux bailleurs de mesurer le niveau de performance de l'équipe chargée de la passation des marchés ; - veiller à l’actualisation de la Base de Données entreprises ; - exécuter toute tâche ou mission liée à la passation des marchés assignée par le Coordonnateur du Projet o Responsable des finances : Il coordonne et supervise la comptabilité, la trésorerie, la gestion des fonds, et propose une politique financière à court, moyen et long terme. Il est placé sous la responsabilité du Coordonnateur de Projet. Il finalise les budgets des sous-projets et les adapte au périmètre de l’activité. Il informe en permanence la Coordination sur la santé financière et s’occupe également de l’information financière externe auprès des bailleurs. Il supervise le contrôle de gestion, la trésorerie ou encore la comptabilité. Il collabore constamment avec tous les services et dans le cas d’une négociation, il peut représenter ou assiste le Coordonnateur documents et analyses à l’appui. o Spécialiste en suivi-évaluation : Le spécialiste en suivi-évaluation sera chargé d’assurer la mise en œuvre efficace et efficiente des activités de suivi-évaluation, de capitalisation et d’apprentissage du projet. A cet effet il - assure la gestion quotidienne du système de suivi-évaluation ; - participe à la supervision de la mise en œuvre des mesures environnementales définie pour la mise en œuvre des sous projets par le spécialiste de sauvegarde environnementale et social et évalue leur performance de concert avec ses collaborateurs; - identifie les difficultés rencontrées dans la préparation, l’exécution des sous-projets et participe à l’application de mesures correctrices; - participe à l’évaluation des besoins et au renforcement des capacités du personnel et des partenaires de mise en œuvre; - rend compte périodiquement au Coordonnateur du Projet du déroulement des activités menées par les différents acteurs de mise en œuvre des sous-projets; - veille à la régularité des rapports techniques du personnel terrain et des partenaires de mise en œuvre des sous-projets; - exploite les rapports soumis par les partenaires et le personnel terrain et participe aux feed- backs en collaboration avec le spécialiste de sauvegarde environnementale et Social ; - participe à la préparation des réunions techniques de coordination; - participe au suivi et à l’évaluation des performances programmatiques et celles du personnel technique placé sous sa supervision; - avec la collaboration du spécialiste de sauvegarde environnementale et social, il consolide les rapports mensuels, trimestriels, semestriels et annuels du personnel terrain et des partenaires de mise en œuvre, analyse les écarts et veille à l’application des mesures correctrices; - participe à la préparation des budgets et des rapports de performance (techniques et financiers), à l’analyse périodique des écarts et à la correction des changements si nécessaires; - encadre et accompagne les collaborateurs et les partenaires de mise en œuvre dans l’exécution des activités à court, moyen et long terme; - appuie l’organisation des missions terrain de supervision, suivi et contrôle des acteurs impliqués dans la mise en œuvre des sous-projets; o Entreprise : Elles répondent aux appels d’offre en vue d’intervenir au niveau opérationnelle. Elles peuvent être responsable de l’exécution des activités retenues dans le cadre du projet et des sous –projets. Elles sont également soit responsable du contrôle des travaux exécuter soit responsable de la réalisation des études environnementales (EIE et NE) préalable à la mise en œuvre de c es activités. Apres adjudication du marché par le spécialiste des marchés publics, les entreprises des travaux mettront en œuvre les mesures contenues dans les plans de gestion environnementale et sociale (PGES) des travaux dont elles ont la charge sur la base du PGES du sous projet. Ils devront disposer en leur sein d’un environnementaliste chargé de la mise en œuvre du PGES o Contrôleur des travaux/Entreprise des travaux : Sous la supervision du Coordonnateur du projet, le contrôleur de travaux sera à temps plein sur le chantier afin de surveiller et de contrôler l’exécution des travaux. Il contrôle les aspects juridiques, techniques et tout ce qui concerne les normes et mesures de conservation de l'environnement. Il est amené à apporter son expertise et à signaler des irrégularités dans le déroulement des travaux, faisant l'interface entre les différentes entreprises du projet et les bénéficiaires. Il élabore et soumet au Coordonnateur les rapports d’avancement des travaux Tableau 1 : Matrice des rôles et responsabilités (au regard de l’arrangement institutionnel de mise en œuvre du CGES) No Etapes/Activités Responsable Appui/ Prestataire Collaboration 1. Identification de la L’Unité Opérationnelle • Bénéficiaires, • Entreprises localisation/site et • Responsable • Entreprises principales caractéristiques technique technique du sous-projet d’activités éligible, (Faire l’E&S screening) • SSES Sélection environnementale Spécialistes Sauvegarde • Bénéficiaire; Bureau d’Etude 2. (Screening-remplissage des Environnementale et • Autorité locale formulaires), et Sociale (SSES) de l’UP • SSES/UP détermination du type d’instrument spécifique de sauvegarde (EIES, RAP, IPP, Audit E&S, AS, etc.) 3. Approbation de la Coordonnateur du Projet SSES/UP • Entité Nationale catégorisation par l’entité chargée des EIE (EN- chargée des EIE et la EIE) Banque • Banque mondiale 4.1. Préparation de l’instrument spécifique de sauvegarde E&S de sous-projet de catégorie A Préparation, approbation et EN-EIE Banque mondiale publication des TDR Réalisation de l’étude y Spécialiste Consultant compris consultation du Passation de publique Marché (SPM); EN- SSES/UP EIE ; Maire ; Validation du document et SPM, Autorité • EN-EIE, obtention du certificat locale • Banque mondiale environnemental Publication du document Coordonnateur • Media ; • Banque mondiale 4.2. Préparation de l’instrument spécifique de sauvegarde E&S de sous-projet de catégorie B ou C Préparation et approbation Banque mondiale des TDR Réalisation de l’étude y Spécialistes en Spécialiste Consultant compris consultation du Sauvegarde Passation de publique Environnementales et Marché (SPM); EN- Sociales (SSES) de l’UP EIE ; Autorité locale Validation du document et SPM, Autorité • EN-EIE, obtention du certificat locale Banque mondiale environnemental Publication du document Coordonnateur • Media ; • Banque mondiale (i) Intégration dans le • SSES 5. dossier d’appel d’offres Responsable Technique SPM (DAO) du sous-projet, de (RT) de l’activité toutes les mesures de la phase des travaux contractualisables avec l’entreprise ; (ii) approbation du PGES entreprise Exécution/Mise en œuvre SSES • SPM • Consultant 6. des mesures non • RT • ONG contractualisées avec • Responsable • Autres l’entreprise de construction Financier (RF) Autorité locale Surveillance interne de la SSES • Spécialiste en Bureau de Contrôle mise en œuvre des mesures Suivi-Evaluation (S- 7. E&S SE) • RF Autorité locale Diffusion du rapport de Coordonnateur SSES surveillance interne Surveillance externe de la EN-EIE SSES mise en œuvre des mesures E&S 8. Suivi environnemental et SSES/UP • Autres SSES • Laboratoires social S-SE /centres spécialisés • ONG 9. Renforcement des capacités SSES/UP • Autres SSES • Consultants des acteurs en mise en SPM • Structures œuvre E&S publiques compétentes Audit de mise en œuvre des SSES/UP • Autres SSES • Consultants 11. mesures E&S • SPM Environnemental • S-SE • EN-EIE • Autorité locale Les rôles et responsabilités tels que décrits ci-dessus seront intégrés dans le manuel d’exécution du projet (MEP). • Principaux indicateurs de mise en œuvre du CGES Les principaux indicateurs de mise en œuvre du CGES sont les suivants : Présence d’un responsable environnemental et social au sein de l’Unité de Coordination du projet, nombre d’EIE et de NIE réalisés, nombre de missions de suivi interne, nombre de sessions d’informati on, de sensibilisation et de formation organisées. • Cadre organisationnel de mise en œuvre efficiente des mesures La mise en œuvre des activités socio-environnementales sera assurée par les organisations de producteurs bénéficiaires et les prestataires de services du projet. Le suivi interne de la mise en œuvre activités socio - environnementales sera effectué par la Coordination du projet à travers un Responsable Environnement et Social (RES) recruté sur appel à candidature à cet effet. Le suivi externe sera assuré par les ministères techniques concernés sous la coordination de la DEEPLCN du ministère en charge de l’environnement. Deux audits environnementaux seront réalisés dont un à la moitié de la troisième année et l’autre à la moitié de la sixième année de mise en œuvre du projet. Ces audits seront réalisés par des consultants externes recrutés à cet effet. • Budget global estimatif prévu pour la mise en œuvre de toutes les mesures environnementales et sociales Le budget global de mise en œuvre du CGES intègre les coûts de renforcement des capacités, d’information, de sensibilisation et de suivi. Ce budget est estimé à 652 050 000 francs CFA soit 1 185 545 US dollars. Coût unitaire Rubrique Source de dépenses Unité Quantité Coût Total (FCFA) (FCFA) Type EIE 3 50 000 000 150 000 000 Provision pour d’irrigation EIES Type NIE 3 25 000 000 75 000 000 d’irrigation Renforcement capacités des promoteurs des sous projets et des prestataires An 6 30 000 000 180 000 000 des travaux d’investissements Formation / envisagés renforcement Renforcement du RES et des capacités des responsables de l’UCP du projet, y compris les responsables des services An 6 5 000 000 30 000 000 techniques associés (DEAFPR, ONDR, DEELCPN) Édition des documents de Sensibilisation et sensibilisation (dépliants, Forfait 1 50 000 000 50 000 000 conscientisation plaques, etc.) PM car déjà pris en compte dans le coût Suivi interne An 6 PM de fonctionnement Suivi du projet Suivi externe par la An 6 6 000 000 36 000 000 DEELCPN Évaluation à mi-parcours Forfait 1 50 000 000 50 000 000 Évaluation Évaluation finale Forfait 1 50 000 000 50 000 000 COUT TOTAL 621 000 000 Imprévus 5% 31 050 000 COÛT GLOBAL DE MISE EN ŒUVRE DU CGES 652 050 000 • Consultations menées L’élaboration de ce cadre a suivi un processus participatif qui a nécessité la consultation des parties prenantes du 22 au 28 août 2016 aussi bien dans les administrations centrales à N’Djamena que sur le terrain à Douguia et auprès des bénéficiaires dans la localité de Ambedane. Les groupes de parties prenantes ainsi rencontrées comprenaient les administrations centrales, les associations d’appui aux producteurs, des ONG et des groupements de producteurs. Cette consultation avait pour but de recueillir les avis des diverses parties prenantes sur le projet notamment sur leurs attentes, leurs craintes, les impacts environnementaux et sociaux potentiels du projet, les mesures d’atténuation envisageables pour le projet, les mécanismes d’implication des producteurs dans la mise en œuvre du projet. Des discussions et des enquêtes ont menées auprès des personnes ressources des administrations concernées et des groupements de producteurs ; ce qui a permis de collecter les informations nécessaires à la consolidation du présent document. Un compte rendu était rédigé au terme de chaque entretien et une synthèse des échanges menés a été faite à la fin des consultations publiques. • Documents complémentaires au CGES Le présent Cadre de Gestion Environnementale et Sociale (CGES) est accompagné de trois documents complémentaires à savoir le Plan de gestion des pesticides, le Cadre de politique de réinstallation. Il sera également élaboré lors de la mise en œuvre des activités les évaluations environnementales notamment les études d’impact environnemental et social et les notices d’impact environnemental en fonction de l’envergure des sous projets concernés. La prise en compte des recommandations édictées dans le présent document permettra de réduire les impacts potentiels négatifs et les problèmes d’environnement que pourrait induire la mise en œuvre du projet. L’approche participative avec les populations locales et les producteurs et tous ceux qui interviennent dans la chaine de l’agriculture irriguée dans tout le processus serait la clé incontournable du succès du projet pour l’atteinte de ses objectifs. De même, des campagnes de sensibilisation, de communication et d’information en fonction des moyens disponibles doivent être prévues pendant toute la période de l’intervention, pour une meilleure adhésion des bénéficiaires aux normes en matière de respect de l’environnement et de sa gestion durable. SFG2799 V4 PROJET D’APPUI REGIONAL A L’INITIATIVE POUR L’IRRIGATION AU SAHEL (PARIIS) ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK FOR THE SIIP-MALI EXECUTIVE SUMMARIES IN ENGLISH AND FRENCH 1. EXECUTIVE SUMMARY PROJECT CONTEXT AND OBJECTIVES The high level forum on irrigation held in Dakar on October 31, 2013 brought together three categories of participants as follows: • Heads of State and Governments from six Sahelian countries (Burkina Faso, Mali, Mauritania, Niger, Senegal and Tchad); • Major regional integration organizations (CILSS, ECOWAS, WAEMU); and • Several international, inter-African, bilateral and multilateral organizations, e.g., World Bank, FAO, etc. This forum led to a declaration called the “DAKAR DECLARATION” that was adopted by all 6 Sahelian countries. The objective of the DECLARATION was to significantly boost investment in hydraulic agriculture, so as to increase developed and exploited hectares from 400,000 to 1,000,000 by 2020. Following the Dakar Conference, the six Sahelian countries, along with their technical and financial partners, and irrigated agriculture stakeholders, put in place a CILSS led Task Force. This Task Force was assigned the directive to backstop a regional program, involving six Sahelian countries, in the implementation of the quantitative and qualitative objectives set forth in Dakar. Subsequently, the Task Force produced a strategic framework document specifying three outputs: • Guidelines to follow; • A Global Action Program (GAP), including all the activities required to achieve the Dakar stated objectives; and • A regional project document to assist the six Sahelian Governments in the implementation of the GAP. This regional project entitled “Regional Support Project for the Sahel Irrigation Initiative Program” received 173 million US dollars from the World Bank Group to design, organize and implement project activities. The Mali Sahel Regional Irrigation Initiative Support Project (SRIISP/PARIIS) easily fits into the guidelines of the current Growth and Poverty Reduction Strategy Paper (GPRSP/CSCRP) for the 2012-2017 period. This is the essential medium term reference document for Mali’s development policy, as well as the principal reference document for all of Mali’s Technical and Financial Partners (TFP). Additionally, SRIISP/PARIIS-Mali is consistent with the long term vision of the National Small Scale Irrigation Program (NSSIP/PNIP). The NSSIP/PNIP is based on the political will of the Government to sustainably develop the important potential of hydro-agricultural infrastructure throughout Mali. Consequently the Government will be able to respond to numerous requests from grassroots stakeholders for irrigation assistance. The development objective of SRIISP/PARIIS is to improve the capacity of stakeholders to develop and manage irrigation and to increase irrigated acreage. This objective will be undertaken according to a regional approach based on specified “solutions” agreed upon by the six Sahelian countries (Burkina Faso, Mali, Mauritania, Niger, Senegal and Tchad). Additionally, this objective will be operationalized through three components: A. Modernization of the institutional and planning framework; B. Funding of irrigation solutions; and C. Knowledge management and coordination. Component “A”, involving the modernization of the institutional and planning framework”, seeks to strengthen the overall institutional capabilities (irrigation agencies, water users associations, local committees, etc.). Further, component “A” plans to strengthen stakeholders’ planning capabilities. This will be done through the development of institutional frameworks, tools and procedures. Lastly, component “A” will also enhance organizational capabilities and reinforce investment potential. Thus, this component will contribute overall to improved irrigation management. Component “B”, which involves funding irrigation solutions, will directly contribute to increased irrigated areas. Using a results approach, this effort will be implemented through investment in the rehabilitation of degraded irrigated zones and the development of new lands. Further, component “B” will reinforce services linked to value chains in irrigated agriculture. It will also prepare the next generation of irrigation projects by (a) reinforcing appropriate financing mechanisms and by (b) accumulating a pipeline of ready-to-go projects. Component “C” involves knowledge management and coordination. This component will contribute to the (a) Project Development Objective through the capitalization of knowledge, (b) monitoring and evaluation systems reinforcement, and (c) efficient project activity coordination at both the national and regional levels. Mali’s SRIISP/PARIIS intervention zones are the following: • Components “A” and “C” activities are nationwide in scope; • Component “B” activities are organized in Priority Intervention Zones (PIZ/ZIP) as follows: • Priority Intervention Zone 1. This covers four administrative Subregions in the Koulikoro and Ségou Regions that are located between the Bani and Niger Rivers. Specifically, this area involves the southern zone of Koulikoro Subregion, Dioila Subregion, the southern zone of Ségou Subregion, and Barouéli Subregion. • Priority Intervention Zone 2. This covers the Ségou “Office du Niger “and Office Riz zones. The SRIISP/PARIIS estimated provisional budget is approximately 19, 5 “milliards de FCFA”. Brief description of the issues, environmental risks and major social criticisms of the potential zones for sub-project establishment. In the project intervention zones, the major environmental and social issues and risks concern primarily the following: • The problem of harmoniously reconciling issues between the agricultural and animal production systems (prevention and management of conflicts among different users of natural water resources); • The adaptation to climatic change (struggle against desertification, sustainable land management, etc. ; • The control of water for irrigated agriculture development; • The integrated management of water resources (rational management of water in the Office du Niger zone and consideration of the shared nature of the Niger River which flows through several countries); • The control of population movement in the SRIISP/PARIIS-Mali intervention zone; and • Gender sensitivity in a decentralization context. Legal and Institutional Framework for Environmental and Social Evaluations Mali has specific legislation for environmental evaluations. In fact, Law no. 01-020 dated 30 May, 2001 regarding pollution and nuisances, in Article 3, states that activities likely to harm or disturb the environment and the quality of life require prior approval from the Minister of the Environmental Ministry. This approval is based on an environmental impact study report. Specifically, the June 26, 2008 Decree No. 08-346 regarding the environmental and social impact study was modified by Decree No. 09-318 dated 26 June, 2009. In this modified Decree, Article 5 specifies that “projects, public or private, involving improvements, construction or other activities in the industrial, energy, agriculture, mining, artisanal, commercial or transport sectors, of which the achievements are likely to harm the environment, are required to complete an Environmental and Social Impact Assessment (ESIA) or an Environmental and Social Impact Notice (ESIN)”. At the institutional level, the Ministry of the Environment, Sanitation, Pollution and Sustainable Development, through the National Direction for Sanitation, Pollution and Nuisances Control, is responsible for the Environmental and Social Impact Assessment, as well as all environmental monitoring activities, as set forth by legislation. Additionally, at the institutional level, the Agriculture and also the Water / Energy Ministries, working through the National Direction for Rural Engineering and the National Direction for Hydraulics, are respectively responsible for irrigation and water resource management. World Bank Safeguard Compliance Policies In accordance with its principles, its geographical coverage and its potential impacts, SRIISP/PARISS is classified as category “A” and must comply with operational and safeguard policies, as follows: • PO 4.01 Environmental evaluation; • PO 4.04 Natural habitats; • PO 4.09 Pest management; • PO 4.11 Physical cultural resources; • PO 4.12 Involuntary resettlement of people; and • PO 17.5 Information dissemination. The Environmental and Social Management Framework (ESMF) provides mechanisms and tools for the project to ensure compliance with specified requirements during the life of the project. The design and overall management of the project are in compliance with the requirements of PO 7.50 regarding water resource management. Potential Positive Environmental and Social Impacts The positive impacts are as follows: • Promotion of good governance of the irrigation subsector; • Promotion of sustainable agriculture; • Achievement of food and nutrition security in the project intervention zone; • Creation of new opportunities for income growth (including sensitive groups e.g., women and youth) ; • Reduction of rural exodus; • Promotion and dissemination of good practices and skills, as well as agricultural technologies including (crop/livestock/fisheries integration, etc.; • SRIISP/PARIIS stakeholders’ capacity building; and • Soil restoration for reforestation and other activities related to water erosion control and desertification. Potential Negative Environmental and Social Impacts The potential negative impacts are as follows: • Clearing of land for development; • Soil degradation due to erosion and waterlogging (salinization and alkalinization); • Increase in diseases linked to water and STIs and HIV/AIDS; • Social conflicts, especially between farmers and herders; • Water resource use competition; • Health risks linked to pesticide use; • Road accident risks; and • Pollution and nuisances (dust, noise, waste, and other). Environmental and Social Management Measures The implementation of the environmental and social evaluation should begin by a preliminary screening of subproject activities (development and rehabilitation of lowlands, Village Irrigated Perimeters and accompanying infrastructure construction). This screening will be carried out in compliance with the environmental and social requirements of the World Bank and Malian legislation. The environmental and social management process is comprised of the following steps: • Step 1. Subproject classification and determination of the environmental type; • Step 2. Classification approval; • Step 3. Examination and approval reports for the Environmental and Social Impact Study or for the Environmental and Social Impact Notice; • Step 4. Public consultations and dissemination; • Step 5. Integration of environmental and social provisions in the tender documents; • Step 6. Implementation of the environmental and social measures; and • Step 7. Environmental and social supervision, (daily) activity surveillance and periodic monitoring During the implementation of the SRIISP/PARIIS subprojects, monitoring will include the management effectiveness of the environmental and social measures as listed in SRIISP/PARIIS Environmental and Social Management Framework. The following indicators will be monitored during implementation: • Number of subprojects selected for Environmental and Social Impact Study, followed by the implementation of Environmental and Social Management Framework; • Number of subprojects which were subject to an Environmental and Social Impact Study and which were implemented according to an Environmental and Social Management Plan; • Number of hectares reforested after clearing; • Number of producers sensitized to hygiene, security and STIs/HIV/SIDA; and • Number of people affected by SRIIP/PARIIS activities. Subproject Environmental and Social Management Procedures The process describes the different steps to follow as soon as the site for each subproject or activity is known. Thus, environmental and social implications can be identified, as well as appropriate measures to be implemented, including institutional responsibilities. The purpose of this process is to ensure that the environmental screening is effective, that the mitigation measures are adequately identified and incorporated in the planning for implementation of eligible activities, and that the monitoring and reporting of implementation measures is effective. Capacity Building for Principal Stakeholders Implicated in the Implementation of the Environmental and Social Management Framework (ESMF) Capacity building includes the following activities: • Training in environmental and social management and also work related health and security; • Information and outreach for local authorities and populations in the SRIISP/PARIIS zone concerning the environmental and social issues of the project identified in Environmental and Social Management Framework; and • Training in water and land resource management. Institutional Arrangement and Roles and Responsibilities for the Implementation of the Environmental and Social Management Framework Plan The institutional mechanism for the environmental and social monitoring will be ensured by: • The supervision of activities will be ensured by the SRIISP/PARIIS Project Coordination Unit. This Unit’s environmental and social safeguard specialist will work with the environmen tal and social safeguard supervisors of private organizations and economic operators; • The oversight of the implementation of the project’s environmental actions will be ensured by the (a) environmental and social safeguard Specialist and the (b) environmental and social safeguard supervisors of private organizations; • The external monitoring for the compliance of the Environmental and Social Management Plan is the responsibility of the Mali Government’s National Direction for Sanitation and the Control of Po llution and Nuisances through a partnership protocol between itself and the SIIRSP/PARIIS. This partnership will include the designation of a SRIISP/PARIIS focal point leader within Mali’s National Direction for Sanitation and the Control of pollution and Nuisances. For external monitoring results achievement this Government/partnership unit will be able to obtain support from several rural development sector’s Technical Divisions (National Direction for Rural Engineering, National Direction for Agriculture, and National Direction for Water and Forestry). • The audit for the implementation of the Environmental and Social Management Plan, as stipulated by Malian legislation, as well as the final evaluation, will be carried out by independent consultants at the end of the project. • Project steering committee. Its mission will be to orient and supervise project implementation. Specifically, it will examine Work Plans and Annual Budgets proposed by the Project Coordination Unit, as well as progress reports on project implementation activities. It will also complete periodic reports. The Steering Committee will ensure the coherence between Project activities and similar ones financed by the Malian Government and other development partners; • Territorial Authority. It will be in charge of awareness raising of subproject site populations, and also social mobilization activities involved in the implementation of the SRIISP/PARIIS-Mali’s Environmental and Social Management Framework; • Producer beneficiaries associations. They will be in charge of information dissemination and awareness raising of local populations on environmental and social issues as concerns SRIISP/PARIIS-Mali activities for subprojects in their action zones. Estimated Costs for Environmental and Social Management Framework Implementation The cost for implementing projected measures is estimated to be three hundred fifty million (350 000 000) FCFA (approximately 700 000 $US). This sum will be incorporated into the SRIISP /PARIIS budget. Stakeholder Consultation The current Environmental and Social Management Framework was presented and discussed in public meetings in the KouliKoro and Ségou Regions and also in the Koulikoro, Dioila, Barouéli and Ségou Subregions. The main objective of these public meetings was to identify and collect various viewpoints, (issues, needs, concerns, expectations, etc.) of particular stakeholders regarding the Project. These public meetings took place during July-August, 2016. Participating in these meetings were the following people who potentially could be involved in the project’s implementation: • Government representatives (Governor, Prefect and Sub-prefect); • Members of technical services (rural engineering, sanitation, agriculture, water and forests, fisheries, animal production, and others; • Locally elected officials (regional, subregional and municipality advisors); • Local producers (rural youth, rural women, animal producers and others); and Professional operator organizations (Permanent Assembly of Agriculture Chambers, Coordination of NGOs and women’s associations (CAFO), Rural Youth Association, Rural Women Association, Animal Production Association). 2. RESUME EXECUTIF Brève description du projet Le forum de Haut Niveau sur l’irrigation tenu à Dakar le 31 octobre 2013 a réuni les Chefs d’Etat et de gouvernement de six pays sahéliens (Burkina Faso, Mali, Mauritanie, Niger, Sénégal et Tchad) avec à leurs côtés, les principales organisations d’intégration régionale (le CILSS, la CEDEAO, l’UEMOA), la Banque Mondiale, la FAO et de plusieurs organisations et institutions internationales, interafricaines, bi et multilatérales. Ce forum a abouti à une déclaration dite de Dakar adoptée par les six pays. L’objectif de cette Déclaration est d’augmenter sensiblement les investissements en matière d’hydraulique agricole pour passer de 400.000 hectares aujourd’hui à 1.000.000 d’hectares aménagées et performants à l’horizon 2020. Suite à la Conférence de Dakar, les six pays ont mis en place avec leurs partenaires techniques et financiers et les acteurs de l’agriculture irriguée une Task Force pilotée par le CILSS, chargée d’instruire un programme régional visant à appuyer les six États dans la réalisation des objectifs quantitatifs et qualitatifs fixés à Dakar. Cette Task Force a entrepris de produire un document de cadre stratégique fixant les orientations à suivre, un programme d’action global (PAG) comprenant toutes les actions nécessaires à l’atteinte des objectifs de Dakar, et un document de projet régional visant à appuyer le s États dans la mise en œuvre du PAG. Ce projet régional intitulé « Projet d’Appui Régional à l’Initiative pour l’Irrigation au Sahel – PARIIS » a obtenu du groupe de la Banque Mondiale une allocation de 173 millions de $US en vue de concevoir, de préparer et de mettre en œuvre les activités du projet. Le PARIIS Mali, s’intègre parfaitement aux orientations de l’actuel CSCRP, pour la période 2012 -2017, document essentiel référence à moyen terme de la politique de développement du pays et le principal référentiel pour l’ensemble des Partenaires Techniques et Financiers (PTF) dans leurs appuis au Mali. Aussi, le PARIIS Mali, est conforme à la vision à long terme du PNIP, qui émane de la volonté politique du Gouvernement de mettre en valeur durablement l’important potentiel d’AHA disponible sur le territoire national afin de répondre aux nombreuses sollicitations formulées par les acteurs à la base. L’objectif de développement du PARIIS est de « améliorer la capacité des parties prenantes à développer et gérer l’irrigation et d’accroitre les superficies irriguées en suivant une approche régionale basée sur les « solutions » dans six pays du Sahel (Burkina Faso, Mali, Mauritanie, Niger, Sénégal et Tchad) ». Cet objectif sera opérationnalisé à travers 3 composantes : a) Modernisation du cadre institutionnel et de planification ; b) Financement des solutions d’irrigation ; et c) gestion de connaissances et coordination. La Composante A: Modernisation du cadre institutionnel, contribuera directement au renforcement institutionnel (agences d'irrigation, associations des usagers de l'eau, comités locaux, etc.) et à l’amélioration des capacités en planification en élaborant des cadres institutionnels, des outils et des procédures. Elle permettra également d'augmenter les capacités organisationnelles, de renforcer le potentiel d'investissement en améliorant l'environnement général de la gestion de l'irrigation. La Composante B: Financement de solutions d'investissement dans l'irrigation contribuera directement à augmenter les superficies irriguées grâce à des investissements dans la réhabilitation des périmètres irrigués dégradés et le développement de nouveaux aménagements dans une approche axée sur les résultats. Elle permettra également de renforcer les services liés aux chaines de valeur de l'agriculture irriguée et de préparer la prochaine génération de projets d'irrigation en renforçant les mécanismes de financement appropriés et un pipeline de projets prêts. Enfin, la Composante C: Gestion des connaissances et coordination contribuera à l’ODP par la capitalisation des connaissances, le renforcement de systèmes S&E solides et une coordination efficace des activités du projet aux niveaux national et régional. Les zones d’intervention du PARIIS Mali, sont les suivantes : • Portée nationale pour les activités des composantes A et C ; • les activités de la composante B, sont structurées en deux Zones d’Intervention s Prioritaires (ZIP), qui sont : - Zone d’Intervention Prioritaire 1, elle couvre 4 Cercles des Régions de Koulikoro et Ségou, entres les fleuves Bani et Niger : Sud du Cercle de Koulikoro, Cercle de Dioïla, Sud du Cercle de Ségou et le Cercle de Barouéli ; - Zone d’Intervention Prioritaire 2, qui couvre les zones Office du Niger et Office Riz Ségou. Le budget du PARIIS MALI est de 19,7 milliards de FCFA. Brève description des enjeux et risques environnementaux et sociaux majeurs/critiques des zones potentielles d’implantation des sous-projets Dans les zones d’intervention du projet, les enjeux et risques environnement aux et sociaux majeurs portent essentiellement sur : • la problématique de l’articulation harmonieuse entre les systèmes de production dans les domaines de l’agriculture et de l’élevage (prévention et gestion des conflits entre les différents utilisateurs des ressources naturelles); • l’adaptation aux changements climatiques (lutte contre la désertification, gest ion durable des terres, etc.) ; • la maitrise de l’eau pour le développement de l’Agriculture irriguée ; • la gestion intégrée des ressources en eau (gestion rationnelle de l’eau en zone ON, prise en compte du caractère partagée du fleuve Niger) ; • la maitrise des mouvements des populations dans la zone d’intervention du PARIIS ; • la prise en compte du genre dans un contexte de décentralisation. Cadre juridique et institutionnel des évaluations environnementales et sociales Le Mali dispose d’une législation spécifique aux évaluations environnementales. En effet, la Loi N° 01-020 du 30 mai 2001 relative aux pollutions et aux nuisances dans son article 3 dispose que les activités susceptibles de porter atteinte à l'environnement et à la qualité du cadre de vie sont soumises à une autorisation préalable du ministre chargé de l'Environnement sur la base d'un rapport d'étude d'impact sur l'environnement. De façon spécifique, le Décret N°08-346 du 26 juin 2008 relatif à l’étude d’impact environnemental et social, modifié par le Décret N°09-318 du 26 juin 2009 dans son article 5 précise que « les projets, qu’ils soient publics ou privés, consistant en des travaux, des aménagements, des constructions ou d’autres activités dans les domaines industriel, énergétique, agricole, minier, artisanal, commercial ou de transport dont la réalisation est susceptible de porter atteinte à l’environnement sont soumis à une Etude d’Impact Environnemental et Social (EIES) ou à une Notice d’Impact Environnemental et Social (NIES) ». Sur le plan institutionnel, le Ministère de l’Environnement, de l’Assainissement et du Développement Durable (MEADD), à travers la Direction Nationale de l’Assainissement et du Contrôle des Pollutions et Nuisances (DNACPN) est responsable de la procédure d’EIES et du suivi environnemental, telle qu’édictée par la législation. Aussi , les Ministères de l’Agriculture et de l’Energie et de l’Eau (MA et MEE), à travers la Direction Nationale du Génie Rural (DNGR) et la Direction Nationale de l’Hydraulique (DNH) sont respectivement responsables de l’irrigation et de la gestion des ressources en eau. Politiques de sauvegarde de la Banque mondiale déclenchées Conformément à sa nature, sa couverture géographique et ses impacts potentiels, le PARIIS est classé en catégorie « A » et doit répondre aux exigences des politiques opérationnelles de sauvegarde suivantes : • PO 4.01 Évaluation environnementale ; • PO 4.04 Habitats naturels ; • PO 4.09 Gestion des pestes • PO 4.11 Ressources culturelles physiques ; • PO 4.12 Réinstallation involontaire des personnes ; • PO 17.5 Diffusion de l’information Le présent CGES fournit les mécanismes et outils pour permettre de satisfaire aux exigences desdites politiques pendant la vie du projet. La conception et la gestion globale du projet sont en conformité avec les exigences de la PO 7.50 sur la gestion des ressources en eau. Impacts environnementaux et sociaux positifs potentiels Les impacts positifs sont les suivants : • Promotion de la bonne gouvernance du sous-secteur de l’irrigation ; • Promotion de l’agriculture durable ; • Contribution à l’atteinte de la sécurité alimentaire et nutritionnelle dans la zone d’intervention du projet ; • Création des nouvelles opportunités d’accroissement de revenus (y compris au niveau des groupes sensibles) ; • Réduction de l’exode rural ; • Promotion et la diffusion de bonnes pratiques et des techniques et technologies agricoles (intégration agriculture, élevage, pêche, et autres) • Renforcement des capacités des acteurs du PARIIS ; • Restauration des sols par le reboisement et autres activités de lutte contre l’érosion hydrique et la désertification ; etc. Impacts et risques environnementaux et sociaux potentiels négatifs Les impacts négatifs potentiels • Défrichement pour aménager les parcelles ; • Dégradation des sols par l’érosion et l’engorgement d’eau (salinisation et alcalisation) ; • Augmentation des maladies liées à l’eau et les IST/VIH/Sida ; • Conflits sociaux, surtout entre agriculteurs et éleveurs ; • Compétition dans l’utilisation de la ressource eau ; • Risques sanitaires liés à l’utilisation des pesticides ; • Risques d’accidents de circulation ; • Pollutions et nuisances (poussière, bruit, déchets et autres). Mesures de gestion environnementale et sociale (à renseigner) La mise en œuvre de l’évaluation environnementale et sociale devra commencera par un tri préliminaire des activités des sous-projets (aménagement et réhabilitation des bas fonds, PIV, PPM, et la construction des infrastructures d’accompagnement). Ce tri s’effectuera en conformité avec les exigences environnementales et sociales de la Banque mondiale et de la législation malienne. Le processus de gestion environnementale et sociale s’articule au tour des étapes suivantes : - Etape 1: classification du sous-projet et détermination du type dévaluation environnementale ; - Étape 2: approbation de la classification ; - Étape 3: examen et approbation des rapports d’études (EIES ou NIES) ; - Étape 4: consultations publiques et diffusion ; - Étape 5: intégration des dispositions environnementales et sociales dans les Dossier d’appel d’offre ; - Étape 6 : Mise en œuvre des mesures environnementales et sociales ; - Étape 7: Supervision, Surveillance et Suivi environnemental et social. Lors de la mise en œuvre des sous projets du PARIIS, le suivi inclura l’effectivité de la gestion des mesures environnementales et sociales retenues dans le CGES. Les indicateurs ci-dessous sont proposés à suivre dans le cadre de la mise en œuvre du CGES du PARIIS Mali : - Nombre de sous projets ayant fait l’objet d’une sélection environnementale et sociale ; - Nombre de sous-projet ayant fait l’objet d’une EIES avec PGES mis en œuvre ; - Nombre d’hectare reboisé après déboisement ; - Nombre de producteurs sensibilisés sur les mesures d’hygiène, de sécurité et les IST/VIH/SIDA ; - Nombre de personnes affectées par les activités du PARIIS-Mali ; - Autres. Procédure de gestion environnementale et sociale des sous-projets Le processus décrit les différentes étapes à suivre, dès que le site de chaque sous-projet ou activité est connu, en vue d’identifier les implications environnementales et sociales ainsi que les mesures appropriées à mettre en œuvre, y compris les responsabilités institutionnelles. Il vise à s’assurer que le tri environnemental est effectif, que les mesures d’atténuation sont bien identifiées et incorporées dans le planning d’exécution des activités éligibles, et que le suivi et le rapportage de la mise en œuvre des mesures sont effectifs. Renforcement de capacités des principaux acteurs impliqués dans la mise en œuvre du CGES Le renforcement des capacités inclut les actions suivantes : • Formation dans le domaine de la gestion environnementale et sociale, la santé et sécurité au travail ; • Information et sensibilisation des collectivités et des populations dans la zone du PARIIS sur le CGES, les enjeux environnementaux et sociaux du projet ; • Formation sur la gestion des ressources en eau et en terre, etc. Arrangement institutionnel, rôles et responsabilités pour la mise en œuvre du PCGES Le mécanisme institutionnel de suivi environnemental et social du projet sera assuré ainsi que suit : • la supervision des activités par UCP du PARIIS à travers le Spécialiste de sauvegarde environnementale et sociale et les Chargés environnement et social (CES) des opérateurs et organisations privés ; • la surveillance (suivi interne de proximité) de l’exécution des mesures environnementales du projet sera assurée par le Spécialiste de sauvegarde environnementale et sociale, les CES des opérateurs et organisations privés ; • le suivi externe du respect des PGES est de la responsabilité régalienne de la DNACPN à travers un protocole de partenariat entre elle et le PARIIS. Ce partenariat se manifestera aussi par la désignation d’un responsable (point focal) PARIIS au sein de la DNACPN. Pour atteindre les objectifs de suivi externe elle aura la possibilité de se faire appuyer par certaines directions techniques du secteur du développement rural (DNGR, DNA, DNEF, autres); • l’audit de mise en œuvre du PGES tel que prescrit par la réglementation malienne, et l’évaluation finale seront effectués par des Consultants indépendants à la fin du projet. • Comité de pilotage du projet : Il aura pour mission d’orienter et de superviser la mise en œuvre du projet. Plus spécifiquement, il examinera les Plans de Travail et les Budgets Annuels (PTBA) proposés par la Coordination du Projet ainsi que les rapports de l'état d'avancement de la mise en œuvre des activités du projet et du bilan de la période écoulée. Le CP assure la cohérence entre les activités du Projet et celles similaires financées par le Gouvernement et d'autres partenaires. • Mairie : la collectivité territoriale aura en charge la sensibilisation des populations des sites des sous projets et aussi les activités de mobilisation sociale pour la mise en œuvre des activités du CGES du PARIIS Mali. • Associations de producteurs bénéficiaires : auront en charge l’information et la sensibilisation des membres et des populations locales sur les enjeux environnementaux et sociaux des activités du PARIIS Mali en ce qui concerne les sous projets de leurs zones d’actions. Cout prévisionnel pour la mise en œuvre du CGES Le coût de la mise en œuvre des mesures est estimé à TROIS CENT CINQUANTE MILLIONS (350 000 000) de FCFA (soit environ 700 000 USD) qui sera intégré dans le coût du PARIIS. Consultation des parties prenantes Le présent CGES a fait l’objet de séances de concertation publique dans les Région de Koulikoro et Ségou, et aussi dans les Cercles de Koulikoro, Dioïla, Barouéli et Ségou. L’objectif général était d’identifier et de recueillir les points de vue (préoccupations, besoins, attentes, craintes, etc.) de certaines parties prenantes vis-à-vis du projet. Les concertations publiques ont été effectuées pendant les mois de juillet et aout 2016. Elles ont enregistrée la participation l’Administration (Gouverneur, Préfet et sous-préfet), des services techniques (Services locaux du Génie rural, de l’Assainissement, de l’Agriculture, des Eaux et Forêt, de la Pêche de l’Élevage et autres), élus locaux (conseils régional, de cercle, de commune), les producteurs locaux et organisations professionnelles des exploitants (APCAM, CAFO, jeunes ruraux, femmes rurales, éleveur et autres), susceptibles d’être impliqués dans la mise en œuvre du projet. SFG2799 REPUBLIQUE ISLAMIQUE DE MAURITANIE Honneur -Fraternité- Justice Ministère de l’Agriculture ENVIRONMENTALAND SOCIAL MANAGEMENT FRAMEWORK (ESMF) SIIP-MAURITANIA EXECUTIVE SUMMARIES IN ENGLISH AND FRENCH Ministère de l’Agriculture ELABORATION DU CADRE DE GESTION ENVIRONNEMENTAL ET SOCIAL (CGES) DE PARIIS ELABORATION DU CADRE DE GESTION ENVIRONNEMENTAL ET SOCIAL (CGES) DE PARIIS ELABORATION DU CADRE DE GESTION ENVIRONNEMENTAL ET SOCIAL (CGES) DE PARIIS Executive summary Context of the Project and the Environmental and Social Management Framework (ESMF) The Government of Mauritania with support from the World Bank is preparing the Regional Sahel Irrigation Initiative Support Project (PARIIS). A joint preparation mission of the Bank and the Mauritanian government of PARIIS was organized from 16 to 20 May 2016 following the identification mission conducted in six countries in October and November 2015 and the completion of the regional Task Force’s work for the Sahel Irrigation Initiative. The Strategic Framework for Agricultural Water in the Sahel prepared by the Task Force was presented as side event at the World Bank’s and IMF’s spring meetings in Washington. It lays the foundation for an accelerated expansion of irrigated agriculture and improvement of the sector's performance. The identification mission permitted to clarify the actions to be carried out under the regional project funded by the World Bank up to US $ 173 million in support to the Sahel Irrigation Initiative. The Project Development Objective is to build the capacities of stakeholders to develop and manage irrigation and increase the irrigated areas by following a regional approach based on solutions identified in the six Sahel countries. PARIIS/Mauritania plans to invest in three main components: ‐ Component A-Modernizing the institutional and planning framework; Three groups of activities will be carried out. These activities relate to (i) the analysis of the planning and investment process accompanied by the review of public expenditure related to irrigation; (ii)) support the consultation process between institutional actors and actors in the field; (Iii) support the plan aiming at strengthening the planning and investment process; ‐ Component B-Financing irrigation solutions; These activities are specific to small private and community irrigation. In this context, attention will be given to the capitalization of experiences, the search for synergy and complementarity with the other technical and financial actors present in the project area; ‐ Component C-Knowledge management and regional coordination. ‐ Two main activities will be implemented out: (i) capacity building, and (ii) knowledge management. These two actions will help meet the needs in terms of capacity building both at the level of trainers and at the level of producers. Under Component (A), the following activities will be implemented: (i) analysis of the planning process and implementation of investments together with the review of public expenditure related to irrigation; (ii) support for better consultations between the institutional actors and field actors; (iii) support to the planning process and to the strengthening plan of the investment execution. The second Component (B), will deal with specific private and community small irrigation activities. In this context, attention will be given to the capitalization of experiences, looking for synergy and complementarity with other technical and financial actors now involved in the project intervention zone. Under Component C, two main activities will be implemented: (i) capacity building, and (ii) knowledge management. These activities will address the needs for capacity building for both trainers and producers. Cadre politique et juridique de la gestion environnementale et sociale The implementation of these components will necessarily lead to impacts both positive and negative at the economic, social and environmental levels. It is in this context that this ESMF is developed as a planning instrument to avoid, mitigate or correct the potential negative impacts, as well as maximize the positive impacts, in compliance with relevant national legislation while meeting the requirements of the applicable World Bank safeguard policies. In order to lay the foundations of environmental protection and ensure a sustainable development, Mauritania has adopted and of natural resources. The Environmental Code, promulgated at the level of Law n ° 2000-045, constitutes in this sense, the general framework of reference in this matter. Its main objective is to reconcile ecological imperatives with the requirements of the economic and social development of the country, particularly through the imposition of environmental requirements necessary to protect the various components of the natural environment. According to Mauritanian regulations, any development project having an impact on the natural and human environment is subject to an Environmental Assessment. The legal instruments for this exercise are set out in the Environmental Impact Assessment Decrees, Decrees 2004-094 and 2007-105. The project implementation must meet the requirements of the World Bank’s environmental and social safeguard policies. To do this, and in agreement with the World Bank, the project was classified as Category A in the World Bank’s classification, equivalent to Category A in the Mauritanian legislation on environmental assessment. It is however not planned to fund development activities that would be classified in Category A, except that the technical studies and feasibility studies for large-scale irrigation schemes (generally classified as Category A) to be prepared without funding the works, require considering the environmental and social aspects at the same level as the works. Clear instructions for the regional assessment of environmental and social impacts and notification needs will be included in the terms of reference for the preparation of these assessments, including where applicable, the terms of notification of the riparian countries. Given that the details (locations and size of physical investments) of the program will not be known before the filing of the request to the Board of the World Bank, it was agreed to prepare the management frameworks that define the mechanisms and procedures for identifying and managing the risks and impacts of the program when the aforementioned details become available during the implementation (after approval by the Board of the World Bank). These are: (i) an environmental and social management framework (ESMF), this document completed by; (ii) a resettlement policy framework; and (iii) a pest management plan (PMP). This ESMF has been developed in this context, and will make it possible to support the evaluation of technical, environmental and institutional arrangements during the project implementation. The ESMF will help enforce the monitoring and evaluation measures to be taken into account, the mechanism for involvement, consultation and communication required for the implementation of the project’s environmental and social management framework. The operational policies of the World Bank, initiated in the framework of the project include: ▪ Environmental Assessment (OP 4.01): this ESMF and subsequent ESIAs provide the relevant provisions. Given the nature of the project, the requirements of the Operational Policy 4.07 on water resources management are also included in this document, and finalize the requirements of the Operational Policy 4.01; ▪ Pest Management (OP 4.09) : a pest management plan (PMP) is prepared separately as an additional document; ▪ Involuntary resettlement of people (OP 4.12): a Resettlement Policy Framework (RPF) is prepared separately as an additional document ; ▪ Natural Habitats (OP 4.04): the relevant provisions are included in this ESMF; ▪ OP 4.36 on forests: the relevant provisions are included in this ESMF; ▪ Physical cultural heritage (OP 4.11): this ESMF includes provisions therein; ▪ Safety of Dams (OP 4.37): The policy is triggered in the event of carrying out activities involving the construction of new dams, but also those dependent on the good performance of an existing dam or a dam under construction. The Guidelines and Procedures to apply in such cases are included in this ESMF; ▪ Projects on international waterways (OP 7.50): the policy is triggered but always in compliance with this policy, an exception to the notification was requested. ▪ As a rural development project involving the substantial use of water resources, PARIIS also triggers World Bank Operational Policy 4.07 on Integrated Water Resources Management. The Environmental and Social Management Framework (ESMF) of the project is in compliance with the safeguard policies of the World Bank Group and the environmental legislation currently in force in the country. Environmental and social situation of the project zone The project covers four wilayas (regions) in the Senegal River valley and also in other areas with hydro agricultural potential, in addition to wetlands, such as Mahmouda and Tamourt Enaaj. With its agro-pastoral vocation, the intervention zone is vulnerable to climate hazards, because the livelihoods are heavily dependent on rainfall. The four regions of the valley are subject to loss of biodiversity (fauna and flora), to bird attacks which negatively affect crops, to recurrent droughts, sand dune encroachment, deforestation (carbonization, domestic needs, shifting agriculture, etc.), and other problems like good control, effectiveness and efficiency of irrigation water management. Drainage water discharge results in serious pollution of the river, hence causing new waterborne diseases other than malaria, and also a drastic reduction of fishery resources in the river. Furthermore, conflicts between farmers and livestock breeders are recurring, because of the large number of cattle and the breeding system. The relocation policies revealed a lack of consultation with communities upstream. At the economic and financial levels, irrigated farming poses challenges of profitability and adaptation to climate change. Specifically, the region of Guidimaka is distinguished by its topography; it is crossed by several rivers causing very high water erosion and a lot of washouts. The region is also characterized by the development of flood recession and shallow crops. Screening process of subprojects Under the Mauritanian law, any development project having an impact on the natural and human environment is subject to an Environmental Assessment. The legal instruments for this exercise are contained in Law No. 2000-045 establishing the Code of the Environment spelled out by decrees on Environmental Impact Assessment, and decrees 2004-094 and 2007-105. This selection procedure is carried out upon request and presentation of the project by the project promoter for screening by the DCE, after a preliminary classification by the promoter of the project in type A, B or C. An environmental and social screening of the project activities will be commissioned in collaboration with the Environment Control Directorate (DCE) and all the actors involved. To this end, the main steps are: preparation of technical files of sub-projects, filling the environmental and social screening form, validation by DCE, scoping of ToRs, launching of assessments (EIA, NIE, PGES) and validation by DEC and the World Bank. Strengthening the capacity of actors involved in the implementation of the ESMF: To build the capacities of actors, information, awareness raising and training workshops will be organized. Identified modules will focus on the knowledge of environmental and social safeguards, impact and implementation assessment, but also on the use, storage and transport of chemicals (pests and pesticides). Building the capacities of institutional actors in the areas of environmental legislation on impact studies is necessary. The beneficiaries shall be better informed about the environmental and social safeguard instruments of the World Bank. Institutional mechanism The project institutional mechanism bases on a participatory and inclusive approach of all stakeholders: the Ministry of Environment and Sustainable Development, the Ministry of Agriculture (through the directorates of plant protection, agricultural development, SONADER, strategies and cooperation), the Ministry of Health, the Ministry of Commerce (through SONIMEX), the Ministry of Home Affairs (through emergency preparedness), the Ministry of Hydraulics and Sanitation, decentralized administrative authorities, technical services at the local level, the Project Coordination Unit, socio-professional organizations, NGOs, CBOs and local associations. Summary table of the roles and responsibilities of the institutional actors: Institution Role and responsibilities Ministry of Environment and Responsible for the environmental policy and its implementation Sustainable Development in the country. DCE will be responsible for scoping the environmental assessments, approval of documents and monitoring and evaluation Ministry of Agriculture and its Responsible for the development of policies/strategies in decentralized services agriculture and monitoring their good execution: implementation of PARIIS, developments, production, plant treatment, farmers’ coaching, enforcement of the project’s environmental and social safeguard measures. Ministry of Health Responsible for all issues relating to human health in the country and in the heart of all preventive or curative actions raised by the adverse effects of the Project on health. Issues related to waterborne diseases (schistosomiasis, malaria, etc) will be addressed by the Ministry of Health Ministry of Home Affairs Will manage all issues relating to relocation and safety of people and property in the event of conflicts created by the project Ministry of Commerce Responsible for the importations and exportations of food stuffs and chemicals. Shall be involved in exportations of food stuffs by the Project, if needed Ministry of Hydraulics and Responsible for hydraulic issues linked to boreholes and water Sanitation distribution systems Project Coordination Unit Ensure the daily management of the project: implementation, monitoring and evaluation Organisations Ensure advocacy of farmers’ interests and bulk procurement of Socioprofessional organizations, inputs. Can also play a role in monitoring of environmental and CBOs and local Associations social management plans NGOs Can inform, sensitize and train farmers in the framework of the Project implementation. Can also contribute in financing at local level, and support in monitoring the PGES. Costs and monitoring and evaluation measures The execution of the technical and environmental measures and surveillance, monitoring, evaluation and capacity building activities will require funds. The table below shows the measures and related costs for the implementation of the activities. Measures planned Description of activities and estimate costs Cost in $ Provision to conduct Realization of hydroagricultural infrastructures environmental assessment Establishment of plot irrigation systems studies of the sub projects Establishment of wáter drainage systems 100 000 (EIES/NIES/PGES etc.) Production tracks Plan an average of 3500 $/NIE and 5000 $/EIE Development of awareness PARIIS through the PCU will conduct awareness raising 75 000 raising, information and campaigns, information meetings in each region of the communication campaigns river valley and wetlands concerned (agricultural basins) with the NGOs and CBOs to inform the local elected representatives, the local populations on the objectives and challenges of PARIIS, the environmental and social aspects related to the projects and the activities. The number of information, awareness raising and communication campaigns will depend on the objectives set and the scope of the intervention We can determine an average cost of 15,000 $ per campaign Environmental Coordination of environmental monitoring is carried out surveillance/monitoring by the Environmental Control Department. 35 000 Surveillance is carried out by work control offices and surveillance offices, SONADER, local governments, NGOs, regional delegates in charge of agriculture and environment. Monitoring will be done by RMES/PARIIS, DCE, SONADER, DAR. Evaluation Hiring of consultants for a midterm evaluation and a final 50 000 evaluation of the project Estimate cost: 15,000 US$ per evaluation. Institutional support Capacity building of partners (DCE, SONADER, DAR, 40 000 Local governments, NGOs) Logistic support Compliance with hygiene and safety measures of workplace installations Pris en Ensure waste collection and disposal after the works charge Health/safety/ hygiene Put in place back-up measures (sanitation, management par les and maintenance program) prestatair Appropriate signals during the works es de See to compliance with safety rules during the works services Total 295 000 Public consultations A public consultation involving all stakeholders (SONADER, Agriculture, Environment, Livestock breeding, Hydraulics, MASEF Regional Service, local NGOs, cooperatives, unions of cooperatives, communities, local elected representatives and administrative authorities) was organized in Trarza, and more precisely in Rosso, Aker and Gani. In the villages of Gani and Aker, the focus group was met. The discussions concerned the major components of the Project and the environmental and social concerns which could be created by the project. The point of view of Wali Mouçaïd (Deputy Governor), permitted to get the authority’s opinion on the project and, particularly on land issues. The most highlighted points in the public consultation process include: • Obsolescent developments in most irrigation areas; • Small areas currently sown in some places which cannot provide sufficient food to the household; • Issue of technical support in the use of chemicals (fertilizers, pesticides, etc.) and compliance with crop itinerary techniques (cropping techniques) by the farmers; • Issues of pollution related to drainage in the Senegal river; • Proliferation of water-borne diseases (malaria, schistosomiasis, amoebiasis, etc.); • Some villages are landlocked because of lack of consultation in the development of plots; • Permanent tensions between farmers and livestock breeders; • Limitation of access to and use of natural resources following non-consulted developments; • Proliferation of invasive aquatic weeds (Typha australis, Salvinia molesta, Piscia ostroides) and heavy infestation of new plants unknown on the river banks; • Contamination of domestic animals through livestock watering with polluted water and fertilizers. The provisions and measures provided for in this ESMF are complemented by the Resettlement Policy Framework (RPF) and the Pest Management Plan (PMP) presented separately, with a view to the sustainable environmental and social management of the project such as: 'Require relevant national environmental legislation and World Bank safeguard policies. Résumé exécutif Contexte Le Gouvernement mauritanien avec l’appui de la Banque Mondiale, est en phase de préparation du Projet d’Appui Régional à l’Initiative pour l’Irrigation au Sahel. Une mission conjointe de préparation de la Banque et du gouvernement mauritanien, de préparation du PARIIS a eu lieu du 16 au 20 Mai 2016 faisant suite à la mission d’identification conduite dans les six pays en Octobre et Novembre 2015 et à la conclusion des travaux de la Task Force régionale pour l’Initiative Irrigation au Sahel. Le Cadre Stratégique pour l’Eau Agricole au Sahel préparé par la Task Force a été présenté lors d’un événement en marge des réunions de printemps de la Banque Mondiale et du FMI à Washington. Il pose les bases pour une expansion accélérée de l’agriculture irrigué et l’amélioration de la performance du secteur. La mission d’identification a permis de préciser les actions à faire porter par le projet régional financé par la Banque Mondiale à hauteur de 173 millions US$ en appui à l’Initiative Irrigation au Sahel. Description du projet L’Objectif de Développement du Projet est de renforcer la capacité des parties prenantes à développer et gérer l’irrigation et d’accroître les superficies irriguées en suivant une approche régionale basée sur les solutions dans six pays du Sahel. Le PARIIS/Mauritanie, envisage de s’investir à travers trois composantes principales : ‐ Composante A-Moderniser le cadre institutionnel et de planification : trois groupes d’activités seront réalisés. Il s’agit des activités d’en lien avec (i) l’analyse du processus de planification et de réalisation des investissements accompagné de la revue des dépenses publiques liées à l’irrigation ; (ii) l’appui pour une meilleure concertation entre les acteurs institutionnels et les acteurs de terrain ; (iii) l’appui au plan de renforcement du processus de planification et de réalisation des investissements; ‐ Composante B-Financer des solutions d’irrigation : il s’agira d’activités spécifiques à la petite irrigation privée et communautaire. Dans ce cadre, une attention sera accordée à la capitalisation des expériences, la recherche de synergie et de complémentarité avec les autres acteurs techniques et financiers présent dans la zone d’intervenant du projet; ‐ Composante C-Gestion des connaissances et coordination régionale : deux activités principales seront réalisées : (i) le renforcement de capacités, et (ii) la gestion des connaissances. Ces deux actions permettront de répondre aux besoins en termes de renforcement de capacités tant au niveau des formateurs qu’au niveau des producteurs. Brève description des enjeux et risques environnementaux et sociaux majeurs/critiques des zones potentielles d’implantation des sous-projets : La zone d’intervention du projet est caractérisée par l’existence d’un grand réseau hydrographiques (fleuve Sénégal) et de son bassin versant. Cette zone est sujette à des perturbations d’ordre environnemental et social, notamment : affluence d’animaux, surpâturage, conflits entre éleveur agriculteur, érosion, dégradation des ressources naturelles etc. Elle abrite la plus grande activité dans le domaine de l’agriculture irriguée avec ce que cela peut comporter comme impact négatif sur l’environnement. Elle est également sujette à une perte de la biodiversité (faune et flore), aux attaques aviaires, qui influent négativement sur les récoltes, à une sécheresse récurrente, à l’avancée des dunes de sable, aux déboisements (carbonisation, besoins domestiques, agriculture itinérante, etc.), à un problème de maîtrise, d’efficacité et d’efficience dans la gestion des eaux d’irrigation. Des pollutions énormes au niveau du fleuve, sont posées par les déversements des eaux de drainage, d’où l’apparition des maladies hydriques nouvelles, autres que le paludisme, ainsi qu’une réduction drastique des ressources halieutiques du fleuve. Cadre politique et juridique de la gestion environnementale et sociale La mise en œuvre de ces composantes, va nécessairement engendrer des impacts aussi bien positifs, que négatifs aux plans économique, social et environnemental. C’est dans ce contexte que ce présent CGES est élaboré comme instruments de planification des dispositions visant à éviter, atténuer ou corriger les impacts négatifs potentiels, ou maximiser les impacts dans le respect des législations nationales pertinentes tout en répondant aux exigences des politiques de sauvegarde environnemental et sociales de la Banque mondiale applicables au Projet. En vue d’asseoir les fondements de la protection de l’environnement et garantir la mise en œuvre d’un développement durable, la Mauritanie a adopté un ensemble de textes législatifs en faveur de la protection et de la gestion durable de l’environnement et des ressources naturelles. Le code de l’environnement, promulgué au niveau de La loi n° 2000-045, constitue dans ce sens, le cadre réglementaire général de référence en la matière. Il a pour objectif essentiel de concilier les impératifs écologiques avec les exigences du développement économique et social du pays à travers particulièrement l’imposition de prescriptions environnementales nécessaires à la protection des différentes composantes du milieu naturel. Selon la réglementation mauritanienne, tout projet de développement ayant un impact sur l’environnement naturel et humain est soumis à une Evaluation Environnementale. Les instruments juridiques pour cet exercice sont consignés par les décrets d’Etude d’Impact Environnemental, les décrets 2004-094 et 2007-105. La réalisation du projet doit donc répondre aux exigences nationales et aux exigences des politiques de sauvegarde environnementale et sociale de la Banque Mondiale. Pour ce faire, et en accord avec la Banque mondiale, le projet a été classé en catégorie A de la Banque mondiale, l’équivalent de la catégorie A dans la législation mauritanienne en matière d’évaluation environnementale. Il n’est cependant pas prévu de financer des activités d’aménagement qui seraient classés en Catégorie A, sauf que les études techniques et les études de faisabilité pour les aménagements d’irrigation à grande échelle (en principe classés en Catégorie A) qui seront préparées sans pour ceci financer les travaux eux-mêmes, nécessitent la prise en considération des aspects environnementaux et sociaux au même niveau que les travaux. Des instructions claires concernant l’évaluation régionale des impacts environnementaux et sociaux et les besoins en matière de notification seront introduites dans les termes de référence pour la préparation de ces évaluations, y inclus le cas échéant les modalités de notification des pays riverains. Etant donné, que les détails (localisations et taille des investissements physiques) du programme ne seront pas connus avant la présentation de la requête au Conseil d’Administration de la Banque mondiale, il a été convenu de préparer les cadres de gestion qui définissent les mécanismes et procédures à appliquer pour identifier et gérer les impacts et risques du programme lorsque les détails susmentionnés seront connus pendant la mise en œuvre (après approbation par le CA de la Banque mondiale). Il s’agit de : (i) un cadre de gestion environnementale et sociale (CGES) le présent document qui est complété par ; (ii) un cadre de politique de réinstallation ; et (iii) un plan de gestion des pestes (PGP). C’est dans ce contexte que ce présent CGES est élaboré. Il va permettre de prendre en charge l’évaluation des mesures techniques, environnementales et les arrangements institutionnels au cours l’exécution du projet. Le CGES devra aider à asseoir les mesures de suivi évaluation à prendre en compte, le mécanisme d’implication, de concertation et de communication requis pour la mise en œuvre du cadre de gestion environnemental et social du projet. Les politiques opérationnelles de la Banque Mondiale, déclenchées dans le cadre du projet sont les suivantes: ▪ l’Evaluation Environnementale (PO 4.01) : le présent CGES et les ESIA subséquents fournissent les dispositions pertinentes. Vu la nature du projet, les exigences de la politique opérationnelle 4.07 sur la gestion des ressources en eau sont également prises en compte dans le présent document, et complémente les exigences de la politique opérationnelle 4.01. ▪ Lutte Antiparasitaire (PO 4.09) : un plan de gestion des pestes (PGP) séparé est préparé en complément ; ▪ Réinstallation Involontaire des personnes (PO 4.12) : un cadre de politique de réinstallation (CPR) séparé est préparé en complément ; ▪ Habitats Naturels (PO 4.04) : les dispositions pertinentes sont dans ce CGES; ▪ la PO 4.36 sur les forêts : les dispositions pertinentes sont dans ce CGES; ▪ Ressources culturelles et physiques (PO 4.11) : le présent CGES comporte des dispositions y relatives ; ▪ Sécurité des barrages (PO 4.37) : La politique est déclenchée en cas de réalisation d’activités comportant la construction de nouveaux barrages, mais aussi celles dépendant de la bonne performance d'un barrage existant ou d'un barrage en construction. Les lignes Directrices et Procédures à suivre dans de tels cas sont pris en considération dans le présent CGES ; Projets relatifs aux voies d’eau internationales (PO 7.50) : la politique est déclenchée mais toujours en conformité avec cette politique, une exception à la notification a été demandée. En tant que projet de développement rural impliquant l’utilisation substantielle de la ressource eau, le PARIIS déclenche également la Politique opérationnelle 4.07 de la Banque mondiale sur la gestion intégrée des ressources en eau. Les principaux impacts/risques génériques du projet, sont : Les principaux impacts, • Amélioration de la productivité agricole irriguée dans les zones ciblées ; • Sécurisation alimentaire et lutte contre la malnutrition ; • Amélioration de la santé et l’hygiène en milieu rural ; • Impacts positifs sur la gestion foncière ; • Création d’emplois et occupation des producteurs ; • Protection de l’environnement bio-physique et des ressources naturelles ; • Le renforcement des infrastructures communautaires ; • Renforcements des capacités des acteurs ; • Amélioration de la prise en compte du Genre dans l’agriculture irriguée ; • Réduction de la perte des capitaux notamment en devise causé par les importations en denrées alimentaires ; • Forte pressions et risques de dégradation des ressources en eau : • Risques liés à la dégradation des terres et la fertilité des • Risque d’incursion et de dégradation des ressources forestières et de la biodiversité • Risques de conflits sociaux avec le développement des périmètres agricoles. Les principales mesures de gestion environnementale et sociale proposées dans le cadre du projet sont : : • Faire un choix concerté des sites d’implantation des périmètres/aménagements futurs ; • Assurer une bonne gestion des eaux d’irrigation, et un bon drainage des sols ; • Effectuer des gardiennages, des étendards, le dénichage des oiseaux, ou l’utilisation des filets • Utiliser des produits de faible rémanence pour la lutte anti acridienne ; • Observer une bonne hygiène personnelle et du milieu, la mise en place d’un bon système de gestion des pesticides, des emballages et des intrants agricoles. Parmi les principaux indicateurs de mise en œuvre du PARIIS, on peut noter : • Existence d’un point focal au niveau de l’UC de PARIIS et ou au MEDD. • Disponibilité des fiches de screening, et classification préalable de chaque sous projet • Nombre de projet ayant fait l’objet d’une EIES/NES avec PGES • Nombre de séances de formation/sensibilisation organisées ; • Nombre de personnes formées avec rapport de formation, liste de présence, module etc. • Nombre de mission de suivi/évaluation environnemental effectués. • Nombre de missions de surveillance effectuées Situation environnementale et sociale de la zone du projet Le projet couvre 4 wilayas (régions) au niveau de la vallée du Fleuve Sénégal, ainsi que d’autres zones à potentiel hydro agricole, en plus des zones humides, telles que Mahmouda et la Tamourt Enaaj. De par sa vocation agropastorale, il s’agit d’une zone vulnérable aux aléas climatiques, puisque les moyens d’existence sont fortement tributaires des précipitations. Les quatre régions de la vallée sont sujettes à une perte de la biodiversité (faune et flore), aux attaques aviaires, qui influent négativement sur les récoltes, à une sécheresse récurrente, à l’avancée des dunes de sable, aux déboisements (carbonisation, besoins domestiques, agriculture itinérante, etc), à un problème de maîtrise, d’efficacité et d’efficience dans la gestion des eaux d’irrigation. Des pollutions énormes au niveau du fleuve, sont posées par les déversements des eaux de drainage, d’où l’apparition des maladies hydriques nouvelles, autres que le paludisme, ainsi qu’une réduction drastique des ressources halieutiques du fleuve. En outre, les conflits entre agriculteurs et éleveurs sont très récurrents et ce du fait du nombre important de bétail et du type d’élevage pratiqué. Les politiques de relocalisation dénotent d’un manque de concertation à l’amont des communautés. Au plan économique et financier, la pratique agricole de l’irrigué, pose des défis de rentabilité et des enjeux d’adaptation face aux changements climatiques. Spécifiquement, la région du Guidimakha, se singularisent par sa topographie, parcourue par plusieurs cours d’eau, d’où de très fortes érosions hydriques, causant beaucoup de ravinements. La région se caractérise également par le développement des cultures de décrue et bas-fonds. Processus de SCREENING et du suivi des sous projets : Un dispositif de screening environnemental et social des activités du projet sera diligenté dans le cadre du projet en collaboration avec la DCE et tous les acteurs impliqués. A cet effet, les principales étapes sont : la préparation des dossiers techniques des sous projets, le remplissage du formulaire de sélection environnementale et sociale, la validation par la DCE, le cadrage des TDRs, le lancement des évaluations (EIE, NIE, PGES) et validation par la DCE et la Banque Mondiale. Renforcement des capacités des acteurs chargés de l’exécution du CGES : Pour le renforcement des capacités des acteurs, des ateliers d’information, de sensibilisation et de formation. Les modules identifiés, porteront sur le renforcement des capacités dans le domaine des connaissances en matière de sauvegardes environnementales et de l’évaluation des impacts et de la mise en, mais aussi à l’utilisation, au stockage et au transport des produits chimiques (pestes et pesticides). Un renforcement des acteurs institutionnels dans les domaines de la législation environnementale en matière d’études d’impacts, s’avère nécessaire. Les populations bénéficiaires devront être mieux informées sur les instruments de sauvegarde environnementale et sociale de la Banque Mondiale Dispositif institutionnel : Le dispositif institutionnel du Projet, s’inscrit dans une démarche participative et inclusive de toutes les parties prenantes : Ministère de l’Environnement et du Développement Durable, le Ministère de l’Agriculture (à travers les directions de la protection des végétaux, de l’aménagement agricole, de la SONADER, des stratégies et de la coopération), le Ministère de la Santé, le Ministère du Commerce (à travers la SONIMEX), le Ministère de l’intérieur (à travers la Protection civile), de l’Hydraulique et de l’Assainissement, les autorités administratives déconcentrées, les services techniques du niveau local, l’Unité de Coordination du Projet, les organisations socioprofessionnelles, les ONG, OCB et les Associations locales. Tableau recapitulatif des rôles et responsabilités des acteurs institutionnels : Institution Rôle et Responsabilités MEDD Responsable de la politique environnementale et de son application dans le pays. La DCE sera chargée du cadrage des évaluations environnementales, de l’approbation des documents et du suivi évaluation Ministère de l’Agriculture et ses Responsable de l’élaboration des politiques/stratégies dans le Services déconcentrés domaine agricole et veille à sa bonne exécution: mise en oeuvre du PARIIS, aménagements, production, traitements phytosanitaires, encadrement des paysans, mise en oeuvre des mesures de sauvegarde environnementale et sociale du Projet Ministère de la santé Responsable de toutes les questions relevant de la santé humaine dans le pays et será au coeur de l’action préventive et/ou curatives des effets négatifs sur la santé, que pourrait générer le projet. Les questions liées aux maladies hydriques (bilharziose, paludisme, etc), seront traitées par le ministère de la santé Ministère de l’intérieur Gére les questions de relocalisation, et de sécurité de biens et des personnes en cas de conflits générés par le projet Ministère du commerce Responsable des importations et des exportations des Denrées et des produits chimiques. Devra s’impliquer dans le cadre des exportations des denrées produites par le projet, en cas de nécessité Ministère de l’hydraulique et de Responsable des questions hyrauliques en lien avec les forages L’Assainissement et les réseaux de distribution d’eau l’Unité de Coordination du Assure la gestión au quotidien du Projet: mise en oeuvre, suivi et Projet, évaluation Organisations Assurent la défense des intérêts des paysans et socioprofessionnelles, OCB et les l’approvisionnement groupé des intrants. Peuvent également Associations locales jouer un rôle dans le suivi des plans de gestión environnemental et social les ONG Pourront informer, sensibiliser et former les paysans, dans le cadre de la mise en oeuvre du projet. Elles pourraient contribuer également au financement à l’échelon local, aider au suivi des PGES Coûts et mesures de suivi évaluation : L’exécution des mesures techniques et environnementales, de surveillance, suivi, évaluation, des activités de renforcement des capacités, va engendrer de coûts. Le tableau ci-dessous illustre l’ensemble des mesures et coûts inhérents à la mise en œuvre des activités. Mesures prévues Description des actions et estimation des coûts Coût $ Provision pour la réalisation et Il s’agit de la réalisation des ouvrages hydro agricoles mise en œuvre d’études Mise en place des dispositifs d’irrigation des périmètres d’Évaluations Mise en place des dispositifs de drainage des eaux 100 000 environnementales des sous Pistes de productions projets (EIES/NIES/PGES Il faut prévoir en moyenne 3500 $/NIE et 5000 $/EIE etc.) Élaboration des campagnes de Le projet PARIIS par le biais de l’UC mènera des 75 000 sensibilisation, campagnes de sensibilisation, des réunions d’information information/communication au niveau de chaque région concernée de la vallée du fleuve et les zones humides (cuvettes agricoles) à travers des prestations des ONG, OCB, pour informer les élus locaux, l’administration, les collectivités, la populations locale des objectifs et enjeux de PARIIS, les aspects environnementaux et sociaux liés aux projets et aux travaux. Le nombre de ses campagnes d’information, sensibilisation communication sont variable suivant les objectifs assignés et l’envergure d’intervention On peut se fixer un coût moyen de 15 000 $/campagne La coordination du suivi environnemental est assuré par la Surveillance/ suivi environnemental Direction du Contrôle Environnemtal. La surveillance est 35 000 faite par les bureaux des travaux et les bureaux de surveillance, la SONADER, collectivités, ONG, délégués régionaux d’agriculture et de l’environnement Le suivi sera effectué par le RMES de PARIIS, la DCE, SONADER, DAR Évaluation Un consultant sera recruté pour une évaluation à mi- 50 000 parcours dans la vie du projet, et une autre évaluation sera programmée à la fin du projet Coût estimatif 15 000 USD/évaluation. Appui institutionnel Renforcement de capacité des partenaires (DCE, 40 000 SONADER, DAR, Collectivités locales ONG) Appui logistique Respect des mesures d’hygiène et de sécurité des installations de chantiers Pris en Assurer la collecte et l’élimination des déchets issus des charge travaux par les Santé /sécurité/ hygiène Mise en place des mesures d’accompagnement prestatai (assainissement, programme de gestion et d’entretien) res de Signalisation adéquate lors des travaux services Veiller au respect des règles de sécurité lors des travaux Total 295 000  Rôles et responsabilités pour la mise en œuvre des mesures de gestion E&S • Coordonnateur du projet : • Spécialiste Sauvegarde Environnementale: • Spécialiste en sauvegarde sociale : • Responsable technique de l’activité éligible : • Spécialiste en passation de marchés : • Responsable des finances : • Spécialiste en suivi-évaluation : • Entreprise : • Contrôleur des travaux : • Mairie : Tableau 8 : Matrice des rôles et responsabilités (au regard de l’arrangement institutionnel de mise en œuvre du CGES) No Etapes/Activités Responsable Appui/Collabora Prestataire tion 1. Identification de la Direction des Ministère Equipe technique localisation/site et politiques, de la Environnement, principales stratégie, et de la du Commerce, caractéristiques technique coopération (Ministère SONADER, du sous-projet ( Agriculture) DAR, Bénéficiaires, Maires Sélection environnementale Spécialiste • Bénéficiaire; 2. (Screening-remplissage des Sauvegarde • Maire formulaires), et Environnementale et • SSES/UP détermination du type d’instrument spécifique de Sociale (SSES) de • l’UP sauvegarde 3. Approbation de la Coordonnateur du SSES/UP • Entité nationale catégorisation par l’entité Projet chargée des EIE chargée des EIE et la (EN-EIE) Banque • Banque mondiale 4.1. Préparation de l’instrument spécifique de sauvegarde E&S de sous-projet de catégorie A Préparation, approbation EN-EIE Banque mondiale et publication des TDR SSES/UP Réalisation de l’étude y Spécialiste Consultant compris consultation du passation de publique marché (SPM); EN-EIE ; Maire Validation du document SPM, Maire • EN-EIE, et obtention du certificat • Banque mondiale environnemental Publication du document Coordonnateur • Media ; • Banque mondiale 4.2. Préparation de l’instrument spécifique de sauvegarde E&S de sous-projet de catégorie B ou C Préparation et Banque mondiale approbation des TDR No Etapes/Activités Responsable Appui/Collabora Prestataire tion Réalisation de l’étude y Spécialistes en Spécialiste Consultant compris consultation du sauvegarde passation de publique environnementales et marché (SPM); sociales (SSES) de EN-EIE ; Maire Validation du document l’UP SPM, Maire • EN-EIE, et obtention du certificat • Banque mondiale environnemental Publication du document Coordonnateur • Media ; • Banque mondiale Intégration dans le 5. dossier d’appel d’offres Responsable technique • SSES (DAO) du sous-projet, de (RT) de l’activité • SPM toutes les mesures de la phase des travaux contractualisables avec l’entreprise Exécution/Mise en œuvre SSES • SPM • Consultant 6. des mesures non • RT • ONG contractualisées avec • Responsable • Autres l’entreprise de financier (RF) construction • Maire Surveillance interne de SSES • Spécialiste en Bureau de Contrôle la mise en œuvre des Suivi-Evaluation 7. mesures E&S (S-SE) • RF • Mairie Diffusion du rapport de Coordonnateur SSES surveillance interne Surveillance externe de EN-EIE SSES la mise en œuvre des mesures E&S 8. Suivi environnemental et SSES/UP • Autres SSES • Laboratoires social • S-SE /centres spécialisés • • ONG 9. Renforcement des SSES/UP • Autres SSES • Consultants capacités des acteurs en • SPM • Structures mise en œuvre E&S publiques compétentes Audit de mise en œuvre SSES/UP • Autres SSES • Consultants 11. des mesures E&S • SPM • S-SE • EN-EIE • Maire Les rôles et responsabilités tels que décrits ci-dessus seront intégrés dans le manuel d’exécution du projet (MEP). Consultations Publiques : Une consultation publique impliquant toutes les parties prenantes (SONADER, Agriculture, Environnement, Elevage, Hydraulique, Service régional du MASEF, ONG locales, coopératives, les unions des coopératives, communautés, les élus locaux et les autorités administratives) a été organisée au Trarza, et plus précisément à Rosso, Aker et Gani. Au niveau des villages de Gani et Aker, il a été question de focus group. Les débats ont concerné les grandes composantes du Projet et sur les préoccupations environnementales et sociales, qui pourraient être induites par le projet. Le point de vue du Wali Mouçaïd (Gouverneur Adjoint), a permis d’avoir le point de vue l’autorité sur le Projet et, singulièrement sur les questions foncières. Les points les plus saillants soulevés lors du processus de consultation publique sont : • Aménagements vétustes dans la plupart des périmètres ; • Exiguïté des superficies actuellement emblavées au niveau de certaines localités, ne pouvant subvenir aux besoins alimentaires par ménage et en quantité suffisante ; • Problème d’accompagnement technique dans l’utilisation des produits chimiques (engrais, pesticides, etc.) et de respect des itinéraires techniques des cultures (techniques culturales) par les paysans ; • Problèmes de pollution liée au drainage dans le fleuve Sénégal ; • Prolifération des maladies hydriques (paludisme, bilharziose, amibiase, etc.) ; • Problèmes d’enclavement des villages, des suites des aménagements non concertés ; • Tensions permanentes entre agriculteurs et éleveurs ; • Limitation dans l’accès et l’utilisation des ressources naturelles des suites des aménagements non concertés ; • Problèmes de prolifération des plantes envahissantes (Typha australis, Salvinia molesta, Piscia ostroides) et apparition de nouvelles plantes non connues sur les berges du fleuve ; • Contamination des animaux domestiques par l’abreuvement à partir des eaux polluées par les engrais ; Les dispositions et mesures prévues dans ce CGES sont complétées par celles du Cadre de Politique de Réinstallation (CPR) et du Plan de Gestion des Pestes (PGP) présentés séparément, le tout en vue de la gestion environnementale et sociale durable du projet telle que l’exigent la législation environnementale nationale et les politiques de sauvegarde de la Banque mondiale applicables. SFG2799 v5 PROJET D’APPUI REGIONAL A L’INITIATIVE POUR L’IRRIGATION AU SAHEL (PARIIS) ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK OF SIIP-NIGER EXECUTIVE SUMMARIES IN ENGLISH AND FRENCH Executive summary Background: In October 2013 at the Dakar Forum, the six CILSS member states (Burkina Faso, Mali, Mauritania, Niger, Senegal and Chad) alongside the Commissions of ECOWAS, UEMOA, FAO and attended by several organizations international launched a call to action for the development of irrigation in the Sahel through a so-called declaration of Dakar. The purpose of this statement is to significantly increase investments in irrigation to spend 400 000 ha today to one million hectares by 2020. To ensure the implementation of this declaration, the six signatory countries have put in place, with their technical and financial partners and actors of irrigated agriculture, a task force led by the CILSS, responsible for examining a regional project to support these countries in achieving quantitative and qualitative targets set in Dakar. This regional project entitled "Draft Regional Support Initiative for irrigation in the Sahel (PARIIS)" got the group of the World Bank an allowance of US $ 173 million to design, prepare and implement project activities. It is in this context that the Government of the Republic of Niger is busy preparing the Country Component of the project which will take place in four regions namely Agadez, Tahoua, Dosso and Tillabery which present a workable irrigation potential. The PARIIS Niger, through the implementation of some of its components, will bring sensitive to moderate changes in environmental and social terms that must be treated in accordance with the environmental regulations of the Niger and the Environmental and Social Safeguard Policies of the World Bank. Specific details of the various interventions are not fully known at this stage of project preparation, it was decided that a framework Populations Resettlement Policy (CPO), an Environmental and Social Management Framework (ESMF) and a Map of pests and pesticide management (CPMP) are prepared. The CPO and PGPP were prepared in separate documents. This document is the Environmental and Social Management Framework (ESMF) of PARIIS. Objective and Methodology for Framework (ESMF) The objective of the CGES is to provide the structures for the implementation of PARIIS, a set of tools and a description of the environmental and social screening or selection process that will allow them to carry out environmental and social assessments Project activities from the planning stage. The mission was carried out under the supervision of the Project Preparation Technical Committee with the support of the Regional Coordination of CILSS. The methodology used in this study was focused mainly on the issue of inclusion of environmental and social aspects in the projects development agricultural irrigation component sector. Institutional meetings were also conducted at central and decentralized level with key players in the implementation of PARIIS. (See Notes to the People met). Project description The development objective (PDO) is to "improve capacity planning, investment and management of stakeholders and increase the irrigated area for the performance of irrigation systems in 6 countries of the Sahel." The PARIIS is structured in 3 components are: Component A: Modernizing the institutional framework and planning; Component B: Financing of irrigation solutions and Component C: Capacity building, knowledge management and coordination. This is mainly at the component B that are found mainly in investment activities that have negative environmental and socioeconomic impacts. The project is being prepared. The composition and organization of the institutional guidance, implementation and monitoring will be defined taking into account the responsibilities of the different national actors in charge of irrigation and environmental management as well as the sub-regional organizational framework ( CILSS) but with a vision of management by objective and results-oriented for achievement of project development objectives at the national and sub regional levels. Main environmental and social risks and stakes in the project area The main country's irrigation areas include the River Niger valley (Tillabery, Niamey and Dosso areas), the Bosso and Maouri dallols (Dosso and Tillaberi areas), the Ader-Doutchi-Maggia (Tahoua and Dosso areas), the GoulbisKaba of Maradi (Maradi area), the Koramas of Zinder (Zinder area) the KomadougouYobe, the lake system of Chad Lake and the oasis basins (Diffa area) and Irhazer in Agadez area. During this phase, the Project will operate in four regions of Niger namely Agadez, Tahoua, Dosso and Tillaberi, for a total population estimated at 8,576,180 inhabitants, of which 4,264,127 of men (49.7%) and 4,321,053 of women (50, 3%) and will cover, most particularly, four of the major irrigation areas of the country namely: 1) the River Niger valley; 2) the Dallols; 3) the Ader- Doutchi-Maggia; and the Irhazer. The main environmental risks and stakes in these areas are summarized as follows: - The River Niger valley (Niamey, Dosso and Tillaberi areas) The River Niger area is facing a silting risk accelerated by the progressive groundcover degradation in the watersheds of its various tributaries. This phenomenon is worsened by progressive deforestation and desertification. The river silting affects aquatic life and the socio- economic activities (fishing), and increases the flooding risk in urban areas, rural agglomerations located in the major river bed and riparian farmlands resulting thereby in annual production losses. Also, the River Niger area remains the most exposed to risks of urban and industrial pollution. The majority of urban, industrial and rain sewage, from Niamey city is collected through drains and discharged without pretreatment in the River Niger, which constitutes the receptacle of all this pollution. For this purpose, the use of the groundwater constitutes a health risk for a majority of people in urban and rural agglomerations. There is also the proliferation issue of invading water plants (particularly by Typha australis, Mimosa pigra, Eichornia crassipes (water hyacinth)). A major part of the pollutants released in the environment (agricultural wastes) arrives in the River Niger either directly or through runoff. The irrigated cropping is grown mostly from the River Niger water that feeds the sheet during the water rise period. This income generating activity uses chemical fertilizers and pesticides. The obsolete pesticides and pesticide packaging create a significant risk for surface water and public health. Relatively to these environmental risks, the major stakes are: - The development of irrigated cropping without harming the environment; - The appropriate management of sewage of industrial and domestic origin so that they do not arrive directly into the river Niger without undergoing treatment; - The control of the river silting; - The control of the invading plants. -The Dallols (Dosso area) In the dallols, the groundwater is merged with the alluvial aquifers, which exposes it to deterioration risk caused by diffuse pollution. The lower and middle layers are primarily recharged through the groundwater. The latter is itself fed through direct infiltration of the rainwater and especially the runoff in the endoreic areas favorable to the water accumulation in the ponds, where it undergoes significant seasonal and interannual fluctuations. This situation exposes these aquifers to the risks of quality degradation in relation with the economic activities in the area. The groundwater of the CT, is therefore vulnerable to changes in rainfall and runoff as well as in pollution from human activities. Also, this area is exposed to other environmental risks which include: - The land degradation due to wind and water erosion; - The deforestation of forest resources (excessive cutting of green wood); - The drastic reduction of the area of these agro-ecological zones due to climate change effects (droughts, silting due to winds that sweep the fertile soil layers ... ..); - The grabbing of water points by others; - The "mining" exploitation of the lands; - The development of marginal lands; - The development of the agricultural front resulting from the rapid population growth; - The uncontrolled urbanization that does not take care of the existing pastoral structures; - The proliferation of plant species non palatable by animals; - The wild fires; - The overgrazing around the water points; - The collection of bush straw from the enclaves and pastoral areas; As a result of the above, the major stakes are: - The construction of structures that ensure the sustainable environmental management (thresholds, small dams, bunds, etc.); - The promotion of biological and mechanical protection of the banks (tree plantation, erosion control works, dikes); - The rehabilitation and construction of irrigation installations and rehabilitation or construction of social infrastructures in the areas affected by the floods; - The Ader-Doutchi-Maggia (Dosso and Tahoua areas) and Irhazer (Agadez area) The environmental risks and stakes in this area include: • The gradual degradation of forest and wildlife resources; • The colonization of the grazing areas by Prosopis juliflora; • The occupation of forest formations by market gardens; • The climate change ; • The silting of ponds and oasis and the occupation of the Bilma oasis by invading water plants; • The durability of the natural resources exploitation; • The fragility of the production systems to hazards (floods, droughts); • The land pressure (especially in Aïr area); • The chemical and nuclear environmental pollution; • The traditional gold mining; • The wild fires; From the main environmental stakes, the following can be mentioned: • The further development of the Irhazer Valley; • The development of Tamesna plain; • The realization of water mobilization works and for groundwater recharge (dams, thresholds, Water and Soil Conservation/CES / Soil Defense and Restoration/DRS, biological protection of valleys etc.); • The durability of the natural resources exploitation. Policy, Administrative and Legal environmental frameworks As part of the Nigerian environmental policy in environmental management has greatly expanded in the 1990s, and was reinforced by the development of sectoral policies and policy strategies some of which were presented in this CGES. Environmental Management in Niger includes a plurality of actors around a legal and institutional corpus provided enough scale, international, regional and national. The safeguard policies of the World Bank are among the Operational Policies. They are intended to help Bank staff to promote socially and environmentally sustainable development approaches, and to ensure that operations do not harm to people or the environment. They include the Environmental Assessment Policy (EE) and policies within the scope of the EA: cultural property, disputed areas, forestry, indigenous peoples, waterways of international interest, involuntary resettlement, natural habitats, fight pest control and dam safety (WB, 2011). Based on the preliminary definition of the components and activities of the Regional Support Project for the Sahel Irrigation Initiative (PARIISPARIIS), the Project would be a Category A (Full Assessment) project, which means that its environmental impact is likely to be significant The requirements of the Operational Policy 4.07 on water resources management are also taken into account in this document. The safeguards policies triggered by the project are the following:4.01 - Environmental Assessment Yes 4.04 - Natural Habitats : Yes 4.09 - Pest Management Yes 4.11 - Cultural Heritage Yes 4.12 - Involuntary Resettlement Yes 4.10 - Non Indigenous Peoples No 4.36 - Forests No 4.37 - Safety of Dams Yes 7.50 - Projects on International Waterways Yes 7.60 - Projects in Disputed Areas No 17.5 - Dissemination of Information Yes Procedures for analysis and Project Selection The process of selecting sub-projects and / or activities subject to financing PARIIS incorporates a socket approach into account environmental and social concerns. It is consistent with the national procedure for environmental and social assessment which remains consistent with the Bank's safeguard policies. The approach is sustainable activities implemented by the PARIIS through the integration of environmental and social aspects. Public consultations Public consultation means any approach to take notice of the population in order to inform a decision. In general, the public consultation rather refers to formal processes supervised by a defined procedure and often subject to regulatory or legal obligation. Indeed, the World Bank made of the information and public consultation requirement through its Operational Policy 4.01 right from the project design stage. Similarly Nigerian regulations on environmental assessment requires any project promoter to set up an advertising mechanism to bring to the attention of stakeholders information and take into account their views, concerns and expectations vis- à-vis project in order to be integrated in the design thereof. This is in order to comply with these requirements that public consultations and meetings with stakeholders were conducted from 7 to 13 July 2016 with various categories of stakeholders in the regions of Tahoua, Dosso, Tillabery and Niamey. The meetings objectives were to: - Inform the stakeholders involved in the project; - Responding to concerns about the project, its components and impacts; - Assess the general reception that the medium could book the project; - Collect additional information and take into account the concerns, expectations and suggestions of stakeholders; - Assess the need for capacity building of the actors in environmental management The interviewees expect the project: - Improving the quality of life of the beneficiaries; - Job creation; - Increasing agricultural production; - Focus on large-scale irrigation; - Allow the acquisition of information on the irrigated areas; - Coaching in the management of impacts; - Move towards modern agriculture. They also expressed concerns and recommendations that have been reported in the Environmental and Social Management Framework (ESMF). Potential Environmental and Social Impacts of PARIIS The irrigation development implies the realization of a number of facilities that generate many positive environmental impacts both in phase of work in operational phase. In its entirety, the project will be a good opportunity for economic and social development of Niger in particular and CILSS member countries in general by creating opportunities for the development of irrigation. The implementation of PARIIS, will among other things, stimulate private investment in the agricultural sector in targeted areas. Environmentally, the project implementation will: better water management and land and improved management of irrigation potential in Niger and in intervention areas; good water management through suitable and adequate facilities (respectful of standards and the charter of the irrigated area) and with irrigation and drainage systems; preservation of natural areas and wetlands currently uncontrolled and under heavy threats Socially, the positive impacts of the project activities, mainly focusing on: improving agricultural production techniques and systems (horticultural and rice fields); reduction of post harvest losses; improving incomes and marketing conditions; better utilization of production through processing; expanding the range of products; capacity building of different actors on rice and horticultural sectors (producers, traders, transporters, traders). At the level of the population, the impact will be on: the contribution to food security; protein intake, the fight against poverty; the creation of new and enhancement of agricultural employment (reduction of unemployment and the exodus of young people through the creation of local employment opportunities); the improvement of living conditions. The project will also allow the opening up of its areas through the creation of access roads that would make it accessible production zones. It will also, among others, improve access to electricity areas that will eliminate multiple heat pump units currently in use and the risk of pollution of water and soil associated with their use, and will also contribute to improving the living environment of people in the area. In general, potential negative environmental impacts associated with irrigation projects are summarized as follows: • salinization and soil alkalinization; • salinization of alluvial; • falling water levels. In addition to these recurring impacts, activities related to the implementation of PARIIS can produce negative impacts on other environmental components. They will be related to the following: the risk of soil erosion (soil instability) due to agricultural developments, loss of vegetation and biodiversity and degradation of natural habitats during development works and other irrigated perimeters sites for small and medium irrigation (deforestation to prepare agricultural plots), the risks of pollution and degradation of the groundwater and streams related to the use of pesticides and fertilizers, risks related to the use Genetically Modified Organisms (GMOs), environmental and social impacts associated with the construction of agricultural processing facilities, impacts of agricultural tracks, impacts of electrical installations, etc. Socially there could be increased tensions between farmers on land issues or between pastoralists and farmers related to wandering livestock. Environmental and Social Management Plan The selection process of sub-projects and / or activities subject to PARIIS funding integrates an approach to addressing environmental and social concerns. It is consistent with the national environmental and social assessment procedure, which remains consistent with the Bank's safeguard policies. The approach adopted focuses on the sustainability of the activities implemented by PARIIS, taking into account the environmental and social aspects. To comply with environmental and social requirements of the World Bank and the Nigerien legislation, the screening of PARIIS activities should include the following phases: - First phase: Identification of the location / site, and the main technical characteristics of the subproject; - Second phase: environmental selection (Screening-filling of forms), and determining of the specific safeguard tool type; - Third phase: Approval of categorization by the entity in charge of the EIA and the Bank; - Fourth phase: Preparing the E & S specific backup tool per sub-project category; - Fifth phase: Integration of all the measures of the contractible work phases with the company in the bidding documents (DAO) of the subproject; - Sixth phase: Execution / Implementation of measures non- contracted by the construction company; - Seventh phase: internal and external surveillance of the E & S implementation measures and dissemination of internal surveillance report; - Eighth phase: Environmental and Social Monitoring; - Ninth phase: Capacity building of stakeholders in the E & S implementation; - Tenth phase: Audit of the E & S implementation measures. Monitoring and Environmental and Social Surveillance Program Despite the knowledge of certain environmental and social phenomena related to generic impacts PARIIS, the fact remains that it will always remain some uncertainty in the accuracy of other impacts, particularly regarding the impacts diffuse and residual impacts. For this reason, it is necessary to develop an environmental monitoring and monitoring program will be implemented under the PARIIS. During the PARIIS activities include monitoring the effectiveness of the implementation of environmental and social management measures adopted in the Environmental and Social Management Framework (ESMF). The environmental and social components that will need to be followed are: · The surrounding areas of natural habitats (risk of encroachment / incursion, etc.); · Vegetation (classified forests, land and village plantations, etc.); · The quality of surface and ground water (pollution by pesticides, etc.); · The Niger and other water bodies River (disruption during development work); · Wetlands and spawning areas and wildlife (aquatic and forestry); · Conflicts between farmers and herders; · Soil erosion during development; · Soil degradation (salinization, alkalization, etc.); · The health of populations and producers (waterborne diseases, HIV / AIDS, accidents, etc.). The following indicators are proposed to be followed by the environmental and social cell of the PARIIS Coordination unit: · Number of projects subject to environmental and social selection; · Number of project that is the subject of an ESIA with ESMP implemented; · Types of facilities for environmental protection; · Number of hectares reforested after development sites of deforestation; · Number of trees planted or carried landscaped areas; · Level of implementation of environmental and social mitigation measures; · Number of organized training sessions; · Number of organized awareness sessions; · Number of producers sensitized on hygiene, safety and STI / HIV / AIDS; · Level of involvement of communities and local stakeholders in monitoring the work; · Level of consensus (approval) on the choice of development sites; · Level of consideration of gender in the selection of investors; · Number of jobs created in the project areas; · Respects level of hygiene and safety measures; · Types of waste management measures and waste water; · Number of people affected by the PARIIS activities; · Nature and level of compensation; · Number and type of complaints. Institutional Arrangements and Implementation Environmental and Social Management Framework (ESMF) For the Project, the “environmental and social” function should be ensured as both for the implementation and the monitoring. The ESMF will determine the implementation and the monitoring levels. The proposed institutional arrangements concerning the implementation and monitoring roles and responsibilities are as follows: - The Project Steering Committee This committee, chaired by the Ministry of Agriculture, will decide on major strategic directions for the project implementation and the implementing rules therein; - The Project Management Unit (PMU-PARIIS): considering the environmental, social and land stakes of the project, the PMU-PARIIS, will set up an Environmental and Social Cell (ESC) and recruit an Environmental and Social Expert to guarantee the effectiveness of the inclusion of these aspects. The ESC will ensure the environmental and social monitoring, conduct the realization of eventual ESIA, ensure environmental and social training of agricultural investors and other technical bodies involved; etc.; - The Experts in Environmental and Social Safeguards of the PMU (ESE / GRN and ESS / G): They will coordinate the preparation and monitoring of local implementation in relation to the municipalities and technical services concerned. These experts should work closely with the BEEEI; - The Environmental Evaluation and Impact Assessment Office (BEEEI): The BEEEI will also proceed for the examination and approval of the environmental classification of projects as well as the approval of the impact assessments and the ESMP. It will participate in the external monitoring, particularly regarding pollution and nuisances and the improvement of the welfare. It will ensure the "external monitoring» of the ESMF activities implementation. In fact, this monitoring will be an inspection based on internal monitoring reports made by the ESC CPU /PARIIS. The PARIIS project will provide institutional support to BEEEI in this monitoring (logistics, capacitation). The BEEEI will submit its report to the UC- PARIIS for provision to be made, with a copy to the Project Steering Committee, - Technical recipient district areas: the district areas, recipients of the public works will initiate community projects and also will participate in the monitoring, information and sensitization of the population and the establishment of mechanisms for prevention and conflict management. - The technical services in charge of the implementation: the technical services in charge of the implementation (DGA DGGR, DGEF, ONAHA, etc.) have to appoint Focal Points which will support the Municipalities and Producers, and participate in the work monitoring and implementation. - Private providers: Works Enterprises and Control Mission (MoC). The Project activities, including environmental and social measures will be implemented by private providers within whom they should have a Health, Safety and Environment Manager. The close surveillance of the works will be done by Control Missions recruited by the PMU for this purpose, - Producers Organizations and NGOs: They must have and apply procedures and good environmental and social practices in the construction and management of irrigation works that they will benefit. The Environmental NGOs will also participate in informing, training and sensitizing the agricultural producers and the populations on the environmental and social aspects related to the sub-projects implementation, but also in the implementation monitoring and environmental surveillance. Calendar and Implementation Costs An indicative calendar for the implementation of the Environmental and Social Management Framework (ESMF) over five (5) years was proposed. The cost of the Environmental and Social Management Framework (ESMF) implementation is estimated at Six hundred and five millions of CFA (605 000 000). These costs will be included in the overall costs of PARIIS. Activity Total Cost (F.CFA) Provision pour la réalisation d’EIES et de ou 150 000 000 Elaboration d’un manuel de bonnes pratiques agricoles 15 000 000 Situation de référence et mise en place d’une base des données 25 000 000 Restauration du couvert végétal et protection des habitats naturels 50 000 000 perturbés du fait de la réalisation des AHA Socio-economic rehabilitation measures 75 000 000 Surveillance, inspections, monitoring and evaluation, audit 160 000 000 implementation, safeguard measures Training-Information-sensitizing 130 000 000 Total 605000 000 Public consultations Nigerien environmental assessment regulations, as well as World Bank safeguards policies, require that any project proponent establish a consultation mechanism in order to bring the information to the attention of the stakeholders and take their views, concerns and expectations with respect to the project so that they can be integrated in the design of the project. It is in that respect that public consultations and meetings with stakeholders were conducted from 7th to 13th July 2016 with various categories of stakeholders in Tahoua, Dosso, Tillabery and Niamey areas. The meetings objectives were to: - inform the stakeholders involved in the project; - answer to concerns about the project, its components and impacts; - assess the general welcome that the public could bring to the project; - collect additional information and take into account the concerns, expectations and suggestions of the stakeholders; - assess the need for capacity building of the actors in the environmental management The persons met expect from the project: - the improvement of the recipients life quality; - the job opportunities; - the iincrease of the agricultural production; - the emphasis on large-scale irrigation; - allow acquiring information on the irrigated areas; - training on impacts management; - moving to modern agriculture. They also expressed concerns and recommendations that have been reported in the Environmental and Social Management Framework (ESMF). Résumé exécutif Contexte : En octobre 2013 au forum de Dakar, les six Etats membres du CILSS (Burkina Faso, Mali, Mauritanie, Niger, Sénégal et Tchad) aux côtés des Commissions de la CEDEAO, de l’UEMOA, de la FAO et en présence de plusieurs organisations internationales ont lancé un appel à l’action pour le développement de l’irrigation au Sahel à travers une déclaration dite de Dakar. L’objectif de cette déclaration est d’augmenter sensiblement les investissements en matière d’irrigation pour passer de 400 000 ha aujourd’hui à 1 000 000 d’ha à l’horizon 2020. Pour assurer la mise en œuvre de cette déclaration, les six pays signataires ont mis en place, avec leurs partenaires techniques et financiers ainsi que les acteurs de l’agriculture irriguée, une Task Force pilotée par le CILSS, chargée d’instruire un projet régional visant à appuyer ces États dans la réalisation des objectifs quantitatifs et qualitatifs fixés à Dakar. Ce projet régional intitulé «Projet d’Appui Régional à l’Initiative pour l’Irrigation au Sahel (PARIIS)» a obtenu du groupe de la Banque Mondiale une allocation de 173 millions de $US en vue de concevoir, préparer et mettre en œuvre les activités du projet. C’est dans ce cadre que le Gouvernement de la République du Niger s’active à la préparation de la Composante Pays dudit projet qui interviendra dans quatre régions à savoir ’Agadez, Tahoua, Dosso et Tillabéry qui présentent un potentiel irrigable exploitable. Le PARIIS Niger, à travers la mise en œuvre de certaines de ses composantes, risque d’avoir des impacts considérés modérés sur le plan environnemental et social et qui doivent être traités en conformité avec la règlementation environnementale du Niger et les Politiques de Sauvegardes environnementale et sociale de la Banque mondiale. Le projet prévoit également la préparation d’études pour des aménagements plus importants et de projets d’investissements sans pour ceci les financer dans le cadre du présent projet. Les détails spécifiques des différentes interventions n’étant pas entièrement connus au stade actuel de la préparation du projet, il a été retenu qu’un Cadre Politique de Réinstallation des Populations (CPRP), un Cadre de Gestion Environnementale et Sociale (CGES) et un Plan de Gestion de pestes et de pesticides (PGPP) soient préparés. Le CPRP et le PGPP ont été préparés dans des documents séparés. Le présent document constitue le Cadre de Gestion Environnementale et Sociale (CGES) du PARIIS. Objectif et Méthodologie du CGES L’objectif du CGES est de mettre à la disposition des structures chargées de la mise en œuvre du PARIIS, un ensemble d’outils ainsi que la description du processus de screening ou sélection environnementale et sociale qui leur permettra de procéder aux évaluations environnementales et sociales des activités du Projet dès le stade de planification. La méthodologie utilisée dans le cadre de cette étude a été orientée principalement sur la problématique de la prise en compte des aspects environnementaux et sociaux dans le cadre des projets de développement du secteur Agricole à composante irrigation. Des rencontres institutionnelles ont été aussi effectuées au niveau central et décentralisé avec les principaux acteurs de la mise en œuvre du PARIIS. (cf. annexe des Personnes rencontrées). Description du Projet L’objectif de développement (PDO) est d'« améliorer la capacité de planification, d'investissement et de gestion des parties prenantes et d’accroitre les superficies irriguées pour la performance des systèmes d'irrigation dans 6 pays du Sahel ». Le PARIIS est structuré en 3 composantes qui sont : Composante A: Moderniser le cadre institutionnel et de planification ; Composante B: Financer des solutions d’irrigation et Composante C: Renforcement de capacités, gestion de connaissances et coordination. C’est principalement au niveau de la composante B que se retrouvent l’essentiel des activités d’investissement susceptibles d’engendrer des impacts environnementaux et socioéconomiques négatifs. Principaux risques et enjeux environnementaux et sociaux dans la zone du projet Les principales zones d’irrigation du pays comprennent la vallée du fleuve Niger (régions de Tillabéri, Niamey et Dosso), les Dallols Bosso et Maouri (régions de Dosso et Tillabéri), l’Ader -Doutchi-Maggia (régions de Tahoua et Dosso), les Goulbis Kaba et Maradi (région de Maradi), les Koramas (région de Zinder), la Komadougou-Yobé, le système lacustre du lac Tchad et les cuvettes oasiennes (région de Diffa) et l’Irhazer dans la région d’Agadez. Durant cette phase, le Projet interviendra dans quatre régions du Niger à savoir Agadez, Tahoua, Dosso et Tillabéri, totalisant une population estimée 8 576 180 habitants, dont 4 264 127 hommes (49,7%) et 4 321 053 femmes (50,3%) et couvrira, plus particulièrement, quatre des principales zones d’irrigation du pays à savoir : 1) la vallée du fleuve Niger ; 2) les Dallols ; 3) l’Ader-Doutchi-Maggia ; et l’Irhazer. Les principaux risques et enjeux environnementaux dans ces zones se résument comme suit : - La vallée du fleuve Niger (Régions de Niamey, Dosso et Tillabéri) La zone du Fleuve Niger est exposée au risque d'ensablement accéléré par la dégradation progressive du couvert végétal dans les bassins versants de ses différents affluents. Ce phénomène est aggravé par la déforestation et la désertification progressives. L'ensablement du fleuve affecte la vie aquatique et les activités socio-économiques (pêche), et augmente le risque d'inondation des zones urbaines, des agglomérations rurales situées dans le lit majeur du fleuve et des terres agricoles riverains entrainant de ce fait des pertes annuelles de production. Aussi, la zone du fleuve Niger reste le plus exposé aux risques de la pollution urbaine et industrielle. La majorité des eaux usées urbaines, industrielles et pluviales de la ville de Niamey sont collectées par des caniveaux et rejetées sans prétraitement dans le fleuve Niger qui constitue le réceptacle de toutes ces pollutions. A cet effet, l’utilisation de la nappe phréatique constitue un risque sanitaire pour une majorité des habitants des centres urbains et des agglomérations rurales. Egalement, il y a la question de prolifération des plantes aquatiques envahissante (notamment par Typha australis, Mimosa pigra, Eichornia crassipes (jacinthe d’eau)). Une grande partie des polluants rejetés dans l’environnement (rejets agricoles) arrive dans le fleuve Niger soit directement soit par ruissellement. Les cultures irriguées sont pratiquées surtout à partir des eaux du fleuve Niger qui alimentent la nappe en période de hautes eaux. Cette activité génératrice de revenu emploie des engrais chimiques et des pesticides. Les pesticides obsolètes et les emballages des pesticides posent un risque non négligeable pour les eaux de surface et la santé publique. Relativement à ces différents risques environnementaux, les enjeux majeurs restent : - Le développement des cultures irriguées sans porter atteinte à l’environnement ; - La gestion appropriée des eaux usées d’origine industrielle et domestiques afin qu’elles n’arrivent pas directement dans le fleuve Niger sans subir de traitement ; - La lutte contre l’ensablement du fleuve ; - La lutte contre les plantes envahissantes. -Les Dallols (Région de Dosso) Dans les dallols, la nappe phréatique est confondue avec les nappes alluviales, ce qui l'expose aux risques de dégradation occasionnés par les pollutions diffuses. Les nappes inférieures et moyennes sont essentiellement rechargées à travers la nappe phréatique. Cette dernière est elle-même alimentée par infiltration directe des eaux de pluie et surtout des ruissellements dans les zones endoréiques favorables à l’accumulation des eaux dans les mares, où elle subit des fluctuations saisonnières et interannuelles importantes. Cette situation expose ces nappes aux risques de dégradation de la qualité en relation avec les activités économiques dans la région. La nappe phréatique du CT, est donc vulnérable à la variation des précipitations et du ruissellement ainsi qu’à la pollution d’origine anthropique. Aussi, cette zone est exposée à d’autres risques environnementaux que sont : - La dégradation des terres due aux phénomènes d’érosion hydrique et éolienne ; - La déforestation des ressources forestières (coupe abusive du bois vert); - La diminution drastique des superficies de toutes ces zones agro-écologiques à cause des effets de changement climatique (sécheresse, ensablement suite aux vents violents qui balayent les couches fertiles des sols …..) ; - L’accaparement des points d’eau par des tiers ; - L’exploitation « minière » des terres ; - La mise en valeur des terres marginales - L’avancée du front agricole subséquente à la démographie galopante ; - L’urbanisation sauvage qui ne respecte pas les ouvrages pastoraux existants ; - La prolifération des espèces végétales non appétées par les animaux ; - Les feux de brousses ; - Les surpâturages autour des points d’eau ; - Le ramassage de la paille de brousse sur les enclaves et la zone pastorale ; Conséquemment à ce qui précède, les enjeux majeurs sont : - La construction des ouvrages qui assurent la gestion durable de l’environnement (seuils, petits barrages, cordons pierreux, etc.) ; - La promotion de protection biologique et mécanique des berges (plantations, ouvrages antiérosifs, digues) ; - La réhabilitation ou construction d'aménagements hydro-agricoles et Réhabilitation ou construction d'infrastructures sociales dans les zones touchées par les inondations ; - L’Ader-Doutchi-Maggia (Région de Dosso et Tahoua) et l’Irhazer (Région d’Agadez) Les risques et enjeux environnementaux dans cette zone sont : • la dégradation progressive des ressources forestières et fauniques ; • la colonisation des espaces pastoraux par le Prosopis juliflora ; • l’occupation des formations forestières par les jardins maraîchers ; • le changement climatique ; • l’ensablement des mares et oasis et l’occupation des oasis de Bilma par les plantes aquatiques envahissantes ; • la pérennisation de l’exploitation des ressources naturelles ; • la fragilité des systèmes de production aux aléas (inondations, sécheresses) ; • la pression foncière (surtout dans l’Aïr) ; • la pollution chimique et nucléaire de l’environnement ; • l’orpaillage artisanal ; • les feux de brousse ; Au nombre de principaux enjeux environnementaux on peut noter : • la poursuite de la mise en valeur de la vallée de l’Irhazer ; • la mise en valeur de la plaine du Tamesna ; • la réalisation des ouvrages de mobilisation des eaux et de recharge de la nappe (barrages, seuil, CES/DRS, la protection biologique des vallées etc.) ; • la pérennisation de l’exploitation des ressources naturelles. Cadre Politique, Administratif et Juridique en Matière d’environnement Le cadre de la politique environnementale nigérienne en gestion environnementale s’est beaucoup étoffé à partir des années 1990, et s’est vu renforcé par l’élaboration de politiques sectorielles et des stratégies d’orientation dont certaines ont été présentées dans le présent CGES. La gestion de l’environnement au Niger regroupe une pluralité d’acteurs autour d’un corpus juridique et institutionnel assez fourni à l’échelle, internationale, régionale et nationale. Politiques de sauvegarde environnementale et sociale de la Banque mondiale. Sur la base de la définition préliminaire des composantes et des activités du Projet d’Appui Régional à l’Initiative pour l’Irrigation au Sahel (PARIIS), le Projet serait un projet de Catégorie A (Evaluation complète - Full assessment), ce qui signifie que son impact sur l’environnement risque d’être important. Les exigences de la politique opérationnelle 4.07 sur la gestion des ressources en eau sont également prises en compte dans le présent document. Les politiques déclenchées dans le cadre du PARIIS sont les suivantes: Politique de sauvegarde de la Banque Mondiale Applicable au PARIIS 4.01 - Évaluation environnementale Oui 4.04 - Habitats naturels Oui 4.09 - Lutte antiparasitaire Oui 4.11 - Ressources Culturelles Physiques Oui 4.12 - Réinstallation Involontaire Oui 4.10 - Populations autochtones Non 4.36 – Forêts Non 4.37 - Sécurité des barrages Oui 7.50 – Projets relatifs aux voies d’eau internationales Oui 7.60 – Projets dans des zones en litige Non Impacts Environnementaux et Sociaux Potentiels du PARIIS Le développement de l’irrigation suppose la réalisation d’un certain nombre d’infrastructures qui génèrent de nombreux impacts environnementaux positifs aussi bien en phase de travaux qu’en phase d’exploitation. Dans sa globalité, le projet devra constituer une bonne opportunité pour le développement économique et social du Niger en particulier et des pays membres du CILSS en général par la création des opportunités en matière de développement de l’irrigation. La mise en œuvre du PARIIS, permettra entre autres, de stimuler l’investissement privé dans les filières agricoles dans les zones ciblées. Au plan environnemental, la mise en œuvre du projet permettra : une meilleure gestion de l'eau et de la terre et une meilleure gestion du potentiel irrigable au Niger et dans les zones d’intervention; une bonne maîtrise de l’eau grâce à des aménagements adaptés et appropriés (respectueux des normes et de la charte du domaine irrigué) et avec des réseaux d’irrigation et de drainage ; une préservation des aires naturelles et zones humides présentement sans contrôle et objet de fortes menaces Au plan social, les impacts positifs des activités du projet, pour l’essentiel, axés sur : l’amélioration des techniques et des systèmes de production agricoles (horticultures et rizicultures); la réduction des pertes après récolte ; l’amélioration des revenus et des conditions de commercialisation ; une meilleure valorisation de la production par la transformation ; l’élargissement de la gamme des productions ; le renforcement des compétences des différents acteurs intervenant sur les filières rizicoles et horticoles (producteurs, commerçants, transporteurs, opérateurs économiques). Au niveau des populations, les impacts porteront sur : la contribution à la sécurité alimentaire ; l’apport en protéines, la lutte contre la pauvreté ; la création de nouveaux et la valorisation des emplois agricoles (réduction du chômage et à l’exode des jeunes par la création d’opportunités d’emplois locaux); l’amélioration des conditions de vie. Le projet permettra aussi le désenclavement de ses zones par la création de pistes d’accès qui rendraient plus accessibles les zones de production. Il y’aurait également, entre autres, l’amélioration de l’accès à l’électricité des zones qui permettra d’éliminer les multiples groupes motopompes thermiques utilisés actuellement et les risques de pollution des eaux et des sols associés à leur utilisation, et contribuera également à l’amélioration du cadre de vie des populations de la zone. De manière générale, les impacts environnementaux potentiels négatifs associés aux projets d’irrigation sont ainsi résumés: • salinisation et d'alcalinisation des sols; • salinisation des nappes alluviales ; • baisse des niveaux phréatiques. En plus de ces impacts récurrents, les activités liées à la mise en œuvre du PARIIS peuvent générer des impacts négatifs sur les autres composantes du milieu. Ils seront relatifs aux aspects suivants : les risques d’érosion des sols (instabilité des sols) du fait des aménagements agricoles, la perte de végétation et de biodiversité et la dégradation d’habitats naturels lors des travaux d’aménagement des périmètres irrigués et autres sites pour la petite et la moyenne irrigation (déboisements pour préparer les parcelles agricoles), les risques de pollutions et dégradations de la nappe et des cours d’eau liées à l’usage des pesticides et des engrais, les risques liés à l’utilisation des Organismes Génétiquement Modifiés (OGM), impacts environnementaux et sociaux liés aux travaux de construction des infrastructures de transformation des produits agricoles, impacts des pistes agricoles, impacts des installations électriques, etc. Au plan social on pourrait assister à la recrudescence des tensions entre agriculteurs sur les problèmes fonciers ou entre éleveurs et agriculteurs liés à la divagation du bétail. Plan Cadre de Gestion Environnementale et Sociale Procédures d’analyse et de Sélection des Projets Le processus de sélection des sous projets et/ou des activités soumis au financement du PARIIS intègre une démarche de prise en compte des préoccupations environnementale et sociale. Elle est conforme à la procédure nationale d’évaluation environnementale et sociale qui reste cohérente avec les politiques de sauvegarde de la Banque. La démarche retenue vise la durabilité des activités mises en œuvre par le PARIIS à travers la prise en compte des aspects environnementaux et sociaux. Pour être en conformité avec les exigences environnementales et sociales de la Banque mondiale et de la législation nigérienne, la gestion environnementale et sociale des activités du PARIIS doivent comprendre les phases suivantes : - Première phase : Identification de la localisation/site et principales caractéristiques technique du sous-projet - Deuxième Phase : Sélection environnementale (Screening-remplissage des formulaires), et détermination du type d’instrument spécifique de sauvegarde - Troisième phase : Approbation de la catégorisation par l’entité chargée des EIE et la Banque - Quatrième phase: Préparation de l’instrument spécifique de sauvegarde E&S de sous -projet par catégorie - Cinquième phase: Intégration dans le dossier d’appel d’offres (DAO) du sous-projet, de toutes les mesures de la phase des travaux contractualisables avec l’entreprise . - Sixième phase : Exécution/Mise en œuvre des mesures non contractualisées avec l’entreprise de construction - Septième phase : Surveillance interne et externe de la mise en œuvre des mesures E&S et de diffusion du rapport de surveillance interne - Huitième phase : Suivi environnemental et social - Neuvième phase : Renforcement des capacités des acteurs en mise en œuvre E&S - Dixième phase : Audit de mise en œuvre des mesures E&S Programme de Suivi et Surveillance Environnemental et Social Malgré la connaissance de certains phénomènes environnementaux et sociaux liés aux impacts génériques du PARIIS, il n’en demeure pas moins qu’il va toujours subsister un certain degré d’incertitude dans la précision d’autres impacts, notamment en ce qui co ncerne les impacts diffus et les impacts résiduels. Pour cette raison, il s’avère nécessaire d’élaborer un programme de surveillance et de suivi environnemental qui sera mis en œuvre dans le cadre du PARIIS. Lors des activités du PARIIS, le suivi inclura l’effectivité de la mise en œuvre des mesures de gestion environnementales et sociales retenues dans le CGES. Les composantes environnementales et sociales qui devront faire l’objet de suivi sont les suivantes : · Les zones avoisinantes des habitats naturels (risques d’empiètement/incursion, etc.) ; · La végétation (forêts classés, de terroir et plantations villageoises, etc.) ; · La qualité des eaux de surface et souterraines (pollution par les pesticides ; etc.) ; · Le fleuve Niger et autres plans d’eau (perturbation lors des travaux d’aménagement) ; · Les zones humides et zones de frayères et la faune (aquatique et forestière) ; · Les conflits entre agriculteurs et éleveurs ; · L’érosion des sols lors des aménagements; · La dégradation des sols (salinisation, alcalinisation, etc.) ; · La santé des populations et des producteurs (maladies hydriques, VIH/SIDA, accidents, etc.). Les indicateurs ci-dessous sont proposés à suivre par la CES de l’UC du PARIIS: · Nombre de projets ayant fait l’objet d’une sélection environnementale et sociale ; · Nombre de projet ayant fait l’objet d’une EIES avec PGES mis en œuvre ; · Types d’aménagements pour la protection de l’environnement ; · Nombre d’hectares reboisés après déboisement de sites d’aménagement ; · Nombre d’arbres plantés ou d’espaces paysagers réalisés ; · Nombre de séances de sensibilisation organisées ; · Nombre de producteurs sensibilisés sur les mesures d’hygiène, de sécurité et les IST/VIH/SIDA ; · Niveau d’implication des collectivités et acteurs locaux dans le suivi des travaux ; · Niveau de prise en compte du genre dans le choix des investisseurs ; · Nombres d’emplois créés dans les zones du projet ; · Niveau de respects des mesures d’hygiène et de sécurité ; · Nature et niveau des indemnisations ; · Nombre et type de réclamations. Arrangements Institutionnels et Mise en œuvre du CGES Dans le cadre du Projet, la fonction « environnementale et sociale » devra être assurée aussi bien pour la mise en œuvre que pour le suivi. Le CGES précise les niveaux de mise en œuvre et de suivi. Les arrangements institutionnels proposés pour le projet en ce qui concerne les rôles et responsabilités de mise en œuvre et de suivi sont comme suit : Etape 1: Identification de la localisation/site et principales caractéristiques technique du sous-projet L’intégration de la dimension environnementale et sociale dans le cadre du PARIIS doit démarrer dès la phase d’identification et de formulation du sous-projet (avis de projet). A cette étape, l’emplacement (le site) du sous-projet et les activités projetées au financement sont connues. Aussitôt le sous-projet formulé, le Promoteur va remplir le formulaire de caractérisation environnementale et sociale qui permettra de caractériser le sous-projet au plan environnemental et social. Une fiche est proposée en annexe pour réaliser cette caractérisation environnementale et sociale, qui permettra d’apprécier sommairement les enjeux environnementaux, sociaux et fonciers. Dans le cadre du PARIIS, la caractérisation environnementale et sociale sera effectuée par les Communes et Producteurs bénéficiaires, avec l’appui technique de prestataires (bureaux d’études, consultants ; etc.). Ensuite, cette caractérisation environnementale et sociale établit dans la 1ère partie du formulaire de screening sera transmise aux Divisions des Evaluations Environnementales et du Suivi Ecologique (DEESE) logées dans les Direction Régionales de l’environnement, de la Salubrité Urbaine et du Développement Durable, pour classification. Etape 2: Sélection environnementale (Screening-remplissage des formulaires), et détermination du type d’instrument spécifique de sauvegarde Sur la base des informations contenues dans la fiche de caractérisation et d’analyse environnementale, la sélection environnementale et la détermination du type d’instrument spécifique de sauvegarde appropriée du sous-projet va être déterminée par le Spécialiste Sauvegarde Environnementale et Sociale (SSES) de l’UP en relation avec le BEEEI et/ou représentant. Ceci conformément à la législation nationale en vigueur et aux directives de la Banque mondiale en matière environnementale, de déterminer la catégorie du sous-projet. Les différentes catégories sont les suivantes : - Catégorie A : Sous-projet nécessitant une étude d’impact approfondie ; - Catégorie B : Sous-projet nécessitant une étude environnementale et sociale simplifiée ou des mesures d’atténuation simples à annexer au sous-projet. Cette catégorie comporte deux sous catégories B1 et B2. Pour les sous-projets classés B1, une EIES séparée doit être préparée, tandis que pour les sous-projets classés B2, des mesures simples d’atténuation seront appliquées et incluses dans le sous-projet; - Catégorie C : Sous-Projet ne nécessitant pas une étude environnementale et sociale, mais qui sommes toutes nécessiterait d’un suivi plus étroit sur les risques sociaux y afférents ; et/ou - Catégorie FI. Sous-projets dont le financement est effectué au travers d’institution financière intermédiaire ; Le PARIIS étant classé en catégorie B, tout sous-projet de catégorie A ne sera pas éligible au financement, seuls sont éligibles les sous-projets des catégories B et C. Les sous-projets classés en « C » ne nécessiteront aucun travail environnemental. Si aucune politique de sauvegarde n'est déclenchée et que le sous projet est validé (sur les autres aspects de l'évaluation), alors la procédure suit son cours. Si le sous projet déclenche une politique de sauvegarde, les DEESE, le BEEEI et les experts de sauvegardes environnementales et sociales l’UCP/ PARIIS devront s'assurer que les dispositions seront prises pour être en conformité avec la politique déclenchée. Après l’analyse des informations contenues dans les résultats de la sélection et après avoir déterminé la bonne catégorie environnementale et sociale, et donc l’ampleur du travail environnemental et social requis, les Experts en Sauvegardes Environnementales et Sociales de l’UCP, en rapport avec les DEESE et le BEEEI, fera une recommandation pour dire si : (a) un travail environnemental et social ne sera pas nécessaire ; (b) l’application de mesures d’atténuation simples suffira ; ou (c) une EIES spécifique devra être élaborée. Etape 3: Approbation de la catégorisation par le BEEEI et la Banque - Sous-projet classé en Catégorie B 1 : réalisation d’une EIES. Le rapport de l’EIES inclur a un PGES conformément au décret n°2000-397/PRN/ME/LCD du 20 octobre 2000 portant sur la procédure administrative d’évaluation et d’examen des impacts sur l’environnement. Les Experts en Sauvegardes Environnementales et Sociales de l’UCP apporteront un app ui technique à la commune pour (i) l’élaboration des TDR de l’EIES qui seront soumis par la suite au BEEEI et à la Banque mondiale pour validation, (ii) le recrutement des consultants pour effectuer l'EIE ; (iii) et la tenue des consultations publiques conformément aux termes de référence. Pour les microprojets de catégorie B1, tout le PGES est annexé au sous-projet et le coût global du sous-projet doit inclure le coût du PGES. Un exemple de TdR type est fourni en annexe pour guider la préparation des EIES - Sous-projet classé en Catégorie B 2 : application de mesures d’atténuation simples annexées au sous-projet. Dans ce cas de figure, les Experts en Sauvegardes Environnementales et Sociales de l’UCP utilisent les listes des mesures d’atténuation (tableau 1 6) et les clauses environnementales et sociales (Annexe 3) pour sélectionner les mesures appropriées. Le coût global du sous-projet doit inclure le coût de mise en œuvre des mesures d’atténuation. Etape 4.1: Préparation de l’instrument spécifique de sauvegarde E&S de sous-projet de catégorie A Cette sous-étape est de la responsabilité du SSES et l’UP avec l’appui du BEEEI et certaines structures. Elle se décompose en 4 phases que sont : - Préparation, approbation et publication des TDR, elle de la responsabilité du SSES/UP avec l’appui du BEEEI mais aussi de la Banque mondiale. Il noter que le BEEEI et la Banque mondiale font un contrôle d’assurance qualité afin de s’assurer de l’exhaustivité des informations demandées. - Réalisation de l’étude y compris consultation du publique, elle de la responsabilité du SSES/UP avec l’appui du BEEEI mais aussi le Spécialiste passation de marché et les services du consultant qui est recruté pour la circonstance. Il est souhaité le contrôle de la Banque mondiale. - Validation du document et obtention du certificat environnemental, elle de la responsabilité du SSES/UP avec l’appui du BEEEI mais aussi le comité créé pour la circonstance sous forme d’atelier de validation à l’issu duquel les participants f ont une recommandation au Ministre en charge de l’environnement pour la délivrance ou non du certificat de conformité environnementale dépendamment de la qualité du rapport soumis à leur appréciation. - Publication du document, elle de la responsabilité du SSES/UP avec l’appui du BEEEI mais aussi les Maires, les Gouverneurs et les Préfets des zones couvertes par le projet. Intervient également le Spécialiste passation de marché et la Banque mondiale ainsi que les Medias. S’agissant de la banque mondiale, elle publie le rapport d’EIES sur son site Info Shop. Les rôles de chaque acteur doit être décliné dans la mise en œuvre ainsi que tous les engagements souscrits par les uns et les autres. Le promoteur est responsable de la publicité du rapport d’évaluation environnementale et sociale. Etape 4.2: Préparation de l’instrument spécifique de sauvegarde E&S de sous-projet de catégorie B ou C Cette sous-étape est quasi similaire à la précédente . Toutefois, elle est simplifiée et moins contraintes que la première. Etape 5: Intégration dans le dossier d’appel d’offres (DAO) du sous-projet, de toutes les mesures de la phase des travaux contractualisables avec l’entreprise, elle de la responsabilit é du responsable technique en charge de l’activité, avec l’appui du SSES et le SPM. Etape 6 : Exécution/Mise en œuvre des mesures non contractualisées avec l’entreprise de construction Les Experts en Sauvegardes Environnementales et Sociales de l’UP veil leront à la mise en œuvre des mesures non contractualisées avec l’entreprise de construction. Ces experts seront appuyés par le SPM, le RF, le Maire et les bénéficiaires ainsi que le consultant, les ONG et autres structures chaque fois que le besoin se fait sentir. Etape 7 : Surveillance interne de la mise en œuvre des mesures E&S ; Diffusion du rapport de surveillance interne et Surveillance externe de la mise en œuvre des mesures E&S. Elles sont respectivement de la responsabilité du SSES ; Coordonnateur et du BEEEI. Dans le premier cas, le SSES est appuyé par le Spécialiste en Suivi-Evaluation (S-SE), le RF, le Maire et les Bénéficiaires avec les services d’un Bureau de Contrôle. Tandis que dans les deux autres cas, le SSES appui le coordonnateur et le BEEEI. Etape 8: Suivi environnemental et social, le suivi est assurée par les Experts en Sauvegardes Environnementales et Sociales de l’UCP/ PARIIS avec l’appui des élus locaux et des bénéficiaires ainsi que le Spécialiste SE et toute autre structure dont l’expertise est se fait sentir (Laboratoires /centres spécialisés et ONG, etc.). Etape 9: Renforcement des capacités des acteurs de mise en œuvre E&S Il est de la responsabilité du SSES/UP avec l’appui du SPM et les autres SSES impliqués dans la mise en œuvre du PARIIS. Interviennent également les consultants et les Structures publiques compétentes, selon le la thématique à traiter: Etape 10: Audit de mise en œuvre des mesures E&S Il est de la responsabilité du SSES/UP avec l’appui du SPM et le S-SE, le BEEEI et le Maire. Interviennent également les consultants, selon le la thématique à traiter · Le Comité de Pilotage du Projet, Ce Comité, placé sous la présidence du Ministère de l’Agriculture, décidera des grandes orientations stratégiques pour la mise en œuvre du projet et des modalités d’exécution y relatif. · l’Unité de Gestion du Projet (UGP-PARIIS), Compte tenu des enjeux environnementaux, sociaux et fonciers du projet, l’UGP-PARIIS, va mettre en place une Cellule Environnement et Social (CES) et recruter un Expert Environnement et Social pour garantir l’effectivité de la prise en compte de ces aspects. La CES va assurer le suivi environnemental et social, conduire la réalisation des éventuelles EIES, assurer la formation environnementale et sociale des investisseurs agricoles et autres structures techniques impliqués ; etc. · les Experts en Sauvegardes Environnementales et Sociales de l’UCP (ESE/GRN et ESS/G) : Ils vont coordonner la préparation et le suivi de proximité de la mise en œuvre, en rapport avec les communes et les services techniques concernés. Ces experts doivent travailler en étroite collaboration avec le BEEEI. · Le Bureau d’évaluation environnemental et des études d’impacts(BEEEI): Le BEEEI procédera aussi à l’examen et l’approbation de la classification environnementale des projets ainsi que l’approbation des études d’impact et des PGES. Il participera au suivi externe, notamment en ce qui concerne les pollutions et nuisances, et l’amélioration du cadre de vie. Il va assurer le « suivi externe » de la mise en œuvre des activités du CGES. Ce suivi sera en fait une vérification contradictoire basée sur les rapports de suivi interne fait par la CES de l’UC/PARIIS. Le projet PARIIS apportera un appui institutionnel au BEEEI dans ce suivi (logistique, capacitation). Le BEEEI va transmettre son rapport à l’UC-PARIIS pour disposition à prendre, avec ampliation au Comité de Pilotage du Projet. - les communes bénéficiaires techniques: les communes bénéficiaires des ouvrages devront initier les projets communaux et vont aussi participer au suivi, à l’information et la sensibilisation des populations et à la mise en place des mécanismes de prévention et de gestion des conflits. - les services techniques chargés de la mise en œuvre : les services techniques chargés de la mise en œuvre (DGA, DGGR, DGEF, ONAHA, etc.) devront désigner des Points Focaux qui vont appuyer les Communes et les Producteurs, et participer au suivi de la mise en œuvre des travaux. - Les prestataires privés : Entreprises de travaux et Mission de Contrôle (MdC) Les activités du projet, y compris les mesures environnementales et sociales, seront mises en œuvre par des prestataires privés qui devront disposer en leur sein d’un Responsable Hygiène Sécurité et Environnement. La surveillance de proximité des travaux sera assurée par des Missions de Contrôle recrutés par l’UCP à cet effet. - les Organisations de Producteurs et les ONG: Elles doivent disposer et appliquer les procédures et les bonnes pratiques environnementales et sociales dans la réalisation et la gestion des ouvrages hydro-agricoles dont ils seront bénéficiaires. Les ONG environnementales pourront aussi participer à informer, éduquer et conscientiser les producteurs agricoles et les populations sur les aspects environnementaux et sociaux liés à la mise en œuvre des sous-projets, mais aussi au suivi de la mise en œuvre et à la surveillance de l’environnement. Tableau : Matrice des rôles et responsabilités (au regard de l’arrangement institutionnel de mise en œuvre du CGES) No Etapes/Activités Responsable Appui/Collaboration Prestataire 1. Identification de la Producteurs Services techniques Bureaux d’études localisation/site et bénéficiaires communaux Consultants principales caractéristiques technique du sous-projet Sélection environnementale Spécialiste Sauvegarde •Bénéficiaire; 2. (Screening-remplissage des Environnementale et •Maire et conseillers formulaires), et Sociale (SSES) de l’UP municipaux détermination du type •SSES/UP d’instrument spécifique de •Services techniques sauvegarde communaux 3. Approbation de la Coordonnateur du Projet SSES/UP • BEEEI catégorisation par le BEEEI • Banque mondiale et la Banque 4.1. Préparation de l’instrument spécifique de sauvegarde E&S de sous-projet de catégorie A Préparation, approbation et BEEEI Banque mondiale publication des TDR SSES/UP BEEEI ; Maire Réalisation de l’étude y Spécialiste passation Consultant compris consultation du de marché (SPM); publique Validation du document et SPM, Maire • BEEEI, obtention du certificat • Banque mondiale environnemental Publication du document Coordonnateur • Media ; • Banque mondiale 4.2. Préparation de l’instrument spécifique de sauvegarde E&S de sous -projet de catégorie B ou C No Etapes/Activités Responsable Appui/Collaboration Prestataire Préparation et approbation Banque mondiale des TDR Réalisation de l’étude y Spécialistes en Spécialiste passation Consultant compris consultation du sauvegarde de marché (SPM); publique environnementales et DNACPN ; Maire sociales (SSES) de l’UP Validation du document et SPM, Maire • DNACPN, obtention du certificat • Banque mondiale environnemental Publication du document Coordonnateur • Media ; • Banque mondiale Intégration dans le dossier 5. d’appel d’offres (DAO) du Responsable technique • SSES sous-projet, de toutes les (RT) de l’activité • SPM mesures de la phase des travaux contractualisables avec l’entreprise Exécution/Mise en œuvre SSES • SPM • Consultant 6. des mesures non • Responsable • ONG contractualisées avec financier (RF) • Autres l’entreprise de construction • Maire • Bénéficiaires Surveillance interne de la SSES • Spécialiste en Suivi- Bureau de Contrôle mise en œuvre des mesures Evaluation (S-SE) 7. E&S • RF • Mairie • Bénéficiaires Diffusion du rapport de Coordonnateur SSES surveillance interne Surveillance externe de la BEEEI SSES mise en œuvre des mesures E&S 8. Suivi environnemental et SSES/UP • Autres SSES • Laboratoires /centres social • S-SE spécialisés • Bénéficiaires • ONG • Elus locaux 9. Renforcement des capacités SSES/UP • Autres SSES • Consultants des acteurs en mise en • SPM • Structures publiques œuvre E&S compétentes Audit de mise en œuvre des SSES/UP • Autres SSES • Consultants 10. mesures E&S • SPM • S-SE • BEEEI • Maire Les rôles et responsabilités tels que décrits ci-dessus seront intégrés dans le manuel d’exécution du projet (MEP). Calendrier et Coûts de Mise en œuvre Un Calendrier indicatif de mise en œuvre du CGES étalé sur cinq (5) ans a été proposé. Le coût de mise en œuvre du CGES est estimé à six cent et cinq millions (605 000 000) de francs CFA. Ces coûts devront être inclus dans les coûts globaux du PARIIS. Activité Cout Total Provision pour la réalisation d’EIES et de PGES ou NIES 150 000 000 Elaboration d’un manuel de bonnes pratiques agricoles 15 000 000 Situation de référence et mise en place d’une base des données 25 000 000 Restauration du couvert végétal et protection des habitats naturels perturbés 50 000 000 du fait de la réalisation des AHA Mesures de réhabilitation socioéconomique 75 000 000 Formation 30 000 000 Information et sensibilisation 100 000 000 Surveillance, inspections, suivi et évaluation, audit mise en œuvre mesure 160 000 000 de sauvegarde Sous - total 605 000 000 Consultations Publiques La réglementation nigérienne en matière d’évaluation environnementale, de même que les politiques de la Banque mondiale, fait obligation à tout promoteur de projet de mettre en place un mécanisme de consultation afin de porter à la connaissance des parti es prenantes l’information et prendre en compte leurs avis, préoccupations et attentes vis-à-vis du projet afin qu’ils soient intégrés lors de la conception de celui-ci. C’est dans un souci de se conformer à ces différentes exigences que des consultations publiques et rencontres avec les acteurs ont été conduites du 7 au 13 juillet 2016 avec diverses catégories d’acteurs dans les régions de Tahoua, Dosso, Tillabéry et Niamey. Les rencontres avaient pour objectifs de : - Informer les acteurs concernés par le projet ; - Répondre à des inquiétudes sur le projet, ses composantes et impacts ; - Evaluer l’accueil général que le milieu pourrait réserver au projet ; - Recueillir des compléments d’informations et prendre en compte les préoccupations, attentes et suggestions des parties concernées ; - Evaluer les besoins en renforcement des capacités des acteurs en gestion environnementale Les personnes rencontrées attendent du projet : - L’amélioration de la qualité de vie des populations bénéficiaires ; - La création d’emplois ; - L’augmentation de la production agricole ; - Mettre l’accent sur la grande irrigation ; - Permettre l’acquisition d’information sur les zones irrigables ; - L’encadrement dans la gestion des impacts ; - Evoluer vers une agriculture moderne. Elles ont aussi exprimé des préoccupations et des recommandations qui ont été rapportées dans le CGES. SFG2799 v3 REPUBLIQUE DU SENEGAL Un Peuple – Un But – Une Foi _________ MINISTERE DE L’HYDRAULIQUE ET DE L’ASSAINISSEMENT Projet Régional d’Appui à l’Initiative pour l’Irrigation dans le Sahel (PARIIS) ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK FOR SIIP-SENEGAL Executive Summaries in English and French Public EXECUTIVE SUMMARY Context Although countries of the Sahelian region are home to a number of watercourses and aquifers, they cannot exploit properly the potential of their water resources. Water sources are for the most underutilized. The scientific data and the necessary infrastructure to take advantage of these water resources and manage them sustainably are not available in these countries. In addition, only 20% of the irrigation potential is currently operating in the countries of the Sahel and a large number of existing irrigation systems need to be repaired. Despite its potential contribution to the agricultural and rural economy of the countries of the region, irrigation currently covers only 2% of cultivated areas in the Sahel and that less than 20% of the potential is exploited. It is with this observation that at the end of the high-level forum on irrigation in the Sahel, which was held in Dakar in October 2013, at the invitation of the Government of Senegal, of the inter- State Committee to combat drought in the Sahel (CILSS), the World Bank and in the presence of representatives of international organizations, to regional organizations, research, civil society organizations of producers, the private sector and the technical and financial partners; the six Sahel countries Burkina Faso, Mali, Mauritania, Niger, Senegal and Chad have committed to implement a set of strategies and diversified investment programs to exploit the development potential offered by a range of possible irrigation management systems, such as: (1) improving the mobilization of rainwater for agricultural purposes; (2) the individual irrigation of agricultural products of high added value; (3) the small and average irrigation managed by village communities for food needs of households and local markets; (4) the modernization and expansion of existing large public irrigation schemes, including rice; and (5) commercial (national markets or export) irrigation, based on private - public partnerships (PPP) and put in growth poles. It is within this framework that a regional programme of support for the initiative for irrigation in the Sahel (PR2IS) has been formulated to achieve the objectives. For this purpose, the pilot phase of the programme has received from the World Bank Group a funding of 173 million US dollars for the implementation of the three components below: ➢Component A: modernize the institutional and planning framework: ➢Component B: finance solutions for irrigation: ➢Component C: capacity-building, knowledge management and coordination. The objective of the project development is to strengthen the ability of stakeholders to develop and manage the irrigation and increase irrigated areas by following a regional approach based on solutions in six countries of the Sahel. SIIP Senegal has an overall cost estimated at about 15 billion FCFA. The recipients of the project will include farmers who will benefit directly from the selected financed investments within the framework of the project, and indirectly from the increased capacity of public and private stakeholders to provide improved irrigation services. The other recipients are the supervising ministries and their decentralized services, training and research institutions and their students, public and private operators involved in the development and management of irrigation, firms of consultants and companies of construction, investors in Agro-industry, irrigation equipment suppliers and retailers, and producers’ organizations. Given the composition of the planned irrigation systems, about 35% of the direct recipients of the irrigated facilities should be women. The project will aim to push this ratio to 45% in paying special attention to gender balance in all activities of the project. The system of implementation of the SIIP at the regional and national levels will not support the creation of new institutions, but will instead focus on strengthening existing national institutions to improve their capacity for implementation. This approach gives better results in terms of institutional strengthening. CILSS will be the agency of global implementing of the program and will be mainly responsible for regional coordination, under the supervision of the existing regional Steering Committee of the projects and programs of CILSS (CRP). In Senegal, geo-targeting and strategy helped to identify three major priority-Intervention Zones (PIZ). The choices have been made in a consensual manner with various actors on the basis of a number of criteria. We can mention the PIZ A (Valley of the Senegal River (strongly rice with rice PIV (irrigated areas)) which affects the two Administrative Regions that are St. Louis and Matam.) PIZ B (natural Region of Casamance / Kolda-Sedhiou (very active cross-border markets) affecting the Regions of Kolda and Sédhiou; PIZ C (groundnut basin / A center which is an old groundnut area PIV (irrigated areas) and PPM female marketgardening on resources related to water surface or drillings). This zone extends in the regions of Fatick; Kaffrine and Kaolack. The realization of such a project requires meeting the requirements of the World Bank environmental and social safeguard policies. To do this, and in agreement with the World Bank, the project was classified in category A of the World Bank, the equivalent of category 1 in Senegalese legislation about environmental assessment. Given, the details (including locations of physical investments, the size, etc.) of the program will not be known before the presentation of the request to the Board of Directors of the World Bank, it was agreed to prepare management frameworks that define the mechanisms and procedures to identify and manage the risks and impacts of the program when the above details will be known during the implementation (after approval by the Board of the World Bank). It is: (i) a environmental and social management framework (ESMF) this document is completed by; (ii) a resettlement policy framework (RPF); and (iii) a pest management plan (PMP). Moreover, given that the program may affect international waters, the Government will send a notice to the OMVS High Commissioner as appropriate, and will inform the Bank in accordance with its policy on international waters. The specific objectives set through in the environmental and social management framework (ESMF) are: ➢ensure that environmental and social impacts during the phases of preparation and implementation of sub projects of the program are evaluated appropriately and on time so that measures are taken into account in the final design, tender documents, contracts, implementation plans approved by the project manager and during the execution of the work; ➢provide a mechanism for the consultation of the people potentially affected as well as the civil society, NGOs; ➢disclose relevant information to populations potentially affected by the project as well as to the stakeholders; and ➢ensure that compliance to the safeguard policies is guaranteed during the phase of implementation of the sub projects. National Environmental and social Legislation Law n ° 2001-01 15th January 2001 made the environmental assessment one of the tools to support the decision to the competent authorities responsible for the environment. The Decree No. 2001-282 of April 22, 2001, with application of the code of the environment is an instrument of implementation of the law, for this purpose it fixes obligations both to the authorities, project and program promoters. According to the potential impact, the nature, the extent and the location of the project, project types are classified in one of the following categories: •category 1: projects are likely to have significant impacts on the environment; a study of the environmental impact assessment will help to integrate environmental considerations into the economic and financial analysis of the project; This category requires a thorough environmental assessment; •category 2: projects have limited environmental impacts or impacts can be mitigated by applying measures or changes in their design; This category is a summarized environmental assessment). In the list of projects to be an environmental and social impact assessment (ESIA) and based on category 1, include: projects and programs that modify deeply the practices used in agriculture and fishing; exploitation of water resources; projects in areas ecologically fragile and protected areas; projects that may have harmful effects on species of fauna and flora at risk or their critical habitat or having harmful consequences for biological diversity and the transfer of populations (move and resettlement). However fall into the second category are: small and medium-sized agro-industries. irrigation and drainage of small scale; irrigation projects ranging from 100 to 500 hectares, surface water and underground water ranging from 200 to 1,000 hectares. By-laws related to impact studies: The system of the Code of the environment is completed by five by-laws which are: • By-law No. 009471 of 28 November 2001 contents of terms of reference of the EIES; • By-law No. 009470 of 28 November 2001 on the conditions of issue of accreditation delivery for the activities relating to environmental impact studies; • By-law No. 009472 of 28 November 2001 with contents of the report of the EIES; • By-law No. 009468 of 28 November 2001 regulating the participation of the public in the environmental impact study; • By-law No. 009469 of 28 November 2001 with organization/operation of the Technical Committee. Requirements of safeguard policies of the World Bank that would be met by the present ESMF World Bank operational policies that could potentially be released are the following: • the OP 4.01 on environmental assessment (the present ESMF and the subsequent ESIA provide the relevant dispositions); • the OP 4.04 on natural habitats (the relevant dispositions are attached in the ESMF); • the OP 4.09 on the management of pests (a separated pest management plan (PMP) is prepared in addition); • the OP 7.50 on international waters (a notice is sent to the OMVS); • the OP 4.12 on involuntary resettlement (a separated resettlement policy framework (RPF) is prepared in addition); • the OP 4.36 on Forests (the relevant dispositions are attached in the ESMF); • the OP 4.07 on water resources management (national dispositions about this and other instruments are presented in the ESMF for this purpose). Identification of environmental and social issues in the different PIZ of the Project Key challenges based on the PIZ are reported in the table below. Sensitivity analysis of the PIZ Challenges PIZ Bassin du Fleuve PIZ Bassin arachidier PIZ Casamance Sénégal - Water Resources - A sharp decrease in - Presence of the layer - High rainfall (> 800 of the salt the available resource maestrichtien mm) (surface water). - Advanced salty Sensitivity analysis of the PIZ Challenges PIZ Bassin du Fleuve PIZ Bassin arachidier PIZ Casamance Sénégal - -Exceptional tongue Hydrological Scenarios - Irregularity / Weakness of floods causing significant reduction of flooded areas - Reduction of resource renewal (Groundwater) - Soils - Persistence of - Polarization of 57% - Polarization of 20% drought of arable land in the of the country's arable - Floods land country. - Land degradation - Salinization and (loss of agricultural - Very advanced acidification of land, potential of soils, degradation of the especially in the modification of slightly leached tropical mudflats and in certain ecological biodiversity). ferruginous soils called lowlands in Lower "dioric soils" located in Casamance and in the - Degradation of the the northern part of Middle Casamance banks of the Senegal the groundnut basin River (Deforestation of - Loss of fertility in soils the banks, collapse of - Poverty of soils due to bush fires, the banks, destruction Increasingly rainfall erosion on of the banks for the accentuated with the plateaus and terraces, manufacture of reduction of fallow and silting of rice fields time and the artisanal bricks) insufficiency or absence of the fertilization of the land - Vulnerability to Sensitivity analysis of the PIZ Challenges PIZ Bassin du Fleuve PIZ Bassin arachidier PIZ Casamance Sénégal erosion with the destruction of vegetable cover - Biodiversiy - Strong forest - Disappearance of - Slight retreat of the natural woody forest formations with degradation caused by the extension of the formations severe climatic agricultural perimeters conditions and high and the exploitation of anthropozoic pressure the wood - Reduction and - Fraudulent degradation of natural exploitation of wood to wetlands The Gambia - Modification of the - Conversion of river's ichthyological populations to fisheries landscape from the due to insecurity and establishment of the pressure on fisheries dams resources, particularly on protected species and protected areas and the use of unauthorized fishing techniques. - Human and animal - Upsurge of certain The region still has health endemic human water- deficiency in health borne diseases care for its population. (malaria, intestinal Indeed, the number of bilharziasis, urinary health care staff bilharziasis, diarrhea) - working in the area Risk of spread of does not allow to meet epidemics of the standards of the waterborne diseases World Health Sensitivity analysis of the PIZ Challenges PIZ Bassin du Fleuve PIZ Bassin arachidier PIZ Casamance Sénégal (Yellow fever, Cholera, Organization (WHO) Poliomyelitis, (ANSD, 2013). Shigellosis) - Risk of diseases caused by chemical poisoning with the use of pesticides (congenital malformations, interruptions of pregnancy, etc.). - Social Conflicts The development of - Land management The region's insecurity irrigated crops is now conflicts between and crisis situation superimposed on farmers and breeders caused a high preexisting agro- sensitivity on land pastoral systems, - Economic occupation and led to where it disputes space stratification for latent social conflicts and active forces, agriculture (ANSD, 2013). especially in the middle - Land losses of valley. The insertion of indigenous peoples. the irrigated perimeter in the environment and its agropastoral systems is still far from being achieved. This coexistence is marked by various constraints and conflicts, due to the "shock" between logic and the rationality of the two systems, irrigated and agro- pastoral Potential negative environmental and social impacts / risks Activities Impacts Planning and founding - Risk of embrittlement and eutrophication of the river by agricultural activities Hydraulic structures - Risk of disturbance of the spawning grounds of the river - Deforestation, degradation of soil by erosion, destruction of habitats during clearing - Destruction of microfauna and organic material - Loss of pasture land (encroachment on sylvo-pastoral areas) - Dust and disturbance (work phase) - Increased pace of management (threat to livestock, fisheries and EAF) - Deforestation, degradation of soil by erosion, destruction of habitats during clearing - Increase in water-related diseases - Strong pressure on land and water - Possible loss of income or property during construction - Risks of diseases such as STIs / HIV / AIDS Crop Production - Loss of soil fertility - Pollution of water and soil due to pesticides and fertilizers - Health nuisances due to pesticides - Destruction of non-target pesticides - Nuisance when using uncontrolled organic manure - Increase in water-related diseases Activities Impacts - Emphasizing farmer-livestock conflicts for access to water or pasture - Risks of diseases such as STIs / HIV / AIDS - Risks of conflicts of use (drinking water supply, agriculture, livestock and fisheries), risks of land conflicts between indigenous and nonindigenous investors Infrastructures (storage, - Dust, noise, pollution from construction waste, hygiene and safety (accidents) related to the construction of buildings packaging; Processing; - Lack of hygiene in packaging and processing Access roads to production - Loss of biodiversity along the route and at laterite sites areas, power lines) - Encroachment on arable land (for new tracings) - Obstruction of runoff paths - Risks of accidents, nuisances (dust, noise) during work Use of GMOs - Risk of uncontrolled spread of genes in nature - Risk of transmission of resistance, for example to weeds - risk of disturbance of biodiversity with risk of selection of noncontrollable individuals - risk of increased loss of gene diversity of cultivated species - the risk that GMOs (high-added value transgenic plants) will displace locally grown agricultural species. - Human and animal health risks (allergies, fertility problems, congenital malformations, toxicity and other impacts on human and animal health) Environmental and Social Management of PARIIS Implementation of the strategy at the operational level may require environmental assessments (thorough impact assessments, initial environmental analyses), taking into account simple environmental and social measures. In order to facilitate the identification of the type of environmental work to be carried out according to the stakes related to the sites where the structures are located, carrying out these assessments where necessary and / or taking environmental and social measures into account in technical planning, Present ESMF proposes an approach focusing on the national procedure for conducting environmental assessments, supplemented by a number of model documents including (i) the environmental and social selection form, (ii) the checklist of impacts and mitigation measures In the design and operation of irrigation systems, (iii) the monitoring of impacts and mitigation measures in the design, construction and operation of structures (main irrigation system, ground tanks , (iv) an example of a typical environmental and social clauses for the performance of the work, and (v) a model price slip, and (vi) a model of the work and operation impact report. The following strategic measures are proposed to address the major environmental and social issues of the project. • Classification of sites for the activities implementation in the project areas • Carrying out environmental and social studies (based on the screening detailed later in the environmental and social management plan) and respect for environmental and social safeguards. • Maintaining landscapes and conserving particular ecosystems • Protection of production systems • Establishment of a policy of access to land and water • Taking into account vulnerable groups and gender in access to land and water • Linking the project with sustainability planning instruments • Capitalization of environmental and social management of other programs and coordination between actors. • Organizational and capacity-building measures for recipients • Training program • Communication strategy and consultation plan Organization and Institutional Arrangements for the Implementation of the ESMF Several institutions are involved in the implementation of the ESMF, mainly: • The Program Steering Committee: • Program Implementation Unit (PU): • The Department of Environment and Designated Establishments: • Local authorities; • Recipient Producers’ Associations. Roles and responsibilities are outlined in the table below, taking into account existing regulations and good practices in the environmental and social management of programs / projects. Table 1: Matrix of Roles and Responsibilities (under the Institutional Arrangement for FESM Implementation) No Steps/Activities Person in charge Support/Collaboration Project Verification/Approval Manager 1. Identification of PU Local authorities, PU the location / site and main technical DSP/ASUFOR, CADL, characteristics of SAED, the sub-project 2. Environmental PU Environmental •Recipients; SSEP/PU •DREEC/DEEC World Selection and social Bank (Screening-form Safeguard •Town halls filling), And Specialists (ESSS) determination of the type of specific safeguard instrument No Steps/Activities Person in charge Support/Collaboration Project Verification/Approval Manager 3. Approval of Project ESSS/PU •DREEC/DEEC World categorization by Coordinator Bank the EIES entity and the Bank 4.1 Preparation of the specific Category A sub-project E & S safeguard instrument Preparation, ESSS/PU SSEP/PU •DREEC/DEEC World approval and Bank publication of TDR Conduct study Procurement Consultant including public Specialist (PS); consultation EN-EIE ; Mayor Validation of the PS, Mayor •EN-EIE, •Technical Committee document and obtaining the •World Bank •World Bank environmental certificate Publication of the Coordinator •Media ; document •World Bank 4.2 Preparation of the specific B & C sub-project E & S safeguard instrument Preparation and PU Environment Procurement ESSS/PU DEEC World Bank approval of TOR and Social Safeguard Specialist (PS); Conduct study Specialists (ESSS) DNACPN ; Registered including public Consultant consultation Mayor Validation of the PS, Mayor •Steering Technical Committee document and Committee / issuance of the World Bank No Steps/Activities Person in charge Support/Collaboration Project Verification/Approval Manager environmental certificate Publication of the Coordinator •Media ; document • World Bank 5. Integration in the Technical manager •SSS (TM) of the activity Bidding document •PS of the subproject, of all the measures of the phase of work that should be contracted with the company 6. Execution / ESSS •PS •Consultant DEEC/Technical Committee implementation of •TR •NGO measures not •Financial Officer (FO) •Others contracted with the construction •Mayor company 7. Internal SSES •onitoring Control Office DEEC/Technical monitoring of the &Evaluation Specialist Committee implementation of (M&ES) E & S measures •FO •City Hall Dissemination of Coordinator ESSS DEEC/Technical Committee internal monitoring report No Steps/Activities Person in charge Support/Collaboration Project Verification/Approval Manager External DEEC/Technical ESSS  monitoring of Committee the implementation of E & S measures 8 Environmental and ESSS/PU •Other ESSS •Laboratories social monitoring •M&ES /specialized centers •NGO 9 capacity-building ESSS/PU •Other ESSS •Consultants •DEEC/Technical of stakeholders in Committee E&S •PS •Competent implementation Public Structures 10 Audit of ESSS/PU •Other ESSS •Consultants •DEEC/Technical implementation of Committee E & S measures •PS •M&ES •EN-EIE •Mayot Within the framework of the implementation of the FESM, the following protocols are recommended under the institutional arrangements: - environmental monitoring with the DEEC; - monitoring of water resources with the DGPRE; • complementary technical and social studies specific to the sites where irrigation systems are installed, mainly those related to hydrogeology, land, agricultural demand, among others, with the relevant technical services, mainly the DGPRE Budget The budget is estimated to 600 000 000 FCFA calculated on the basis of the following assumptions and variables: •• Two (02) Class A environmental assessments per PIZ; •• three (03) specific technical studies by PIZ Table 10- 2 : PCGES Implementation Budget Poste Cost (FCFA) Capacity-Building Plan 210 000 000 Provisions for studies specific to the determination of reference situations for 180 000 000 environmental monitoring and support for environmental and social decision- making Provisions for Environmental and Social Assessments 150 000 000 Coordination of environmental and social management 60 000 000 Total Cost 600 000 000 This budget will be refined in accordance with the evolution of project planning and negotiations with the various partners. Public consultation Public participation in conducting an environmental assessment is the appropriate approach to put the project into its socio-economic context. It allows to integrate the opinions and comments of the different actors, especially the local population and the technical services, in an interactive way, to measure and take into account the impacts of the project associated with its implementation, in order to minimize or eliminate the negative impacts and to improve the beneficial effects. This participation is done under the way of : - public consultation, i.e meetings during the study, in the concerned places in order to get the opinions of the populations or their representatives; - a public hearing intended to disseminate widely the completed study to the populations in order to record possible oppositions and also the opinions on the solutions, proposals, recommendations and mitigation measures contained in the report. It is also a form of restitution so that people can check whether their opinions, proposals and especially their interests are taken into account. RESUME EXECUTIF Contexte Bien que les pays de la région Sahélienne abritent un certain nombre de cours d’eau et des réservoirs aquifères, ils n’arrivent pas à exploiter de façon optimale le potentiel de leurs ressources hydrique. Les sources d’eau sont pour la plupart sous-utilisées. Les données scientifiques et les infrastructures nécessaires pour tirer parti de ces ressources en eau et les gérer de manière durable ne sont pas disponibles dans ces pays. De plus, seulement 20 % du potentiel d’irrigation est actuellement exploité dans les pays du Sahel et un grand nombre des systèmes d’irrigation existants ont besoin d’être réparés. Malgré sa contribution potentielle à l’économie agricole et rurale des pays de la région, l’irrigation ne couvre actuellement que 2 % des superficies cultivées au Sahel et que moins de 20 % du potentiel est exploité. C’est fort de ce constat qu’un forum de haut niveau sur l’irrigation au sahel qui s’est tenu à Dakar en Octobre 2013 à l’invitation du Gouvernement du Sénégal, du Comité Inter-Etats de Lutte contre la Sécheresse au Sahel (CILSS), de la Banque Mondiale et en présence de représentants des organisations internationales, des organisations régionales, de la recherche, des organisations de la société civile, des organisations de producteurs, du secteur privé et des partenaires techniques et financiers. Au sortir de ce forum, les six pays Sahéliens du Burkina Faso, du Mali, de la Mauritanie, du Niger, du Sénégal et du Tchad ont pris l’engagement de mettre en oeuvre un ensemble de stratégies et de programmes d’investissement diversifiés visant à exploiter le potentiel de développement offert par une palette de systèmes de gestion hydroagricoles possibles, à savoir: (i) l’amélioration de la mobilisation des eaux pluviales à des fins agricoles; (ii) l’irrigation individuelle de produits agricoles de haute valeur ajoutée; (iii) la petite et la moyenne irrigation gérées par les communautés villageoises pour les besoins alimentaires des ménages et les marchés locaux ; (iv) la modernisation et l’expansion des grands périmètres publics (3) irrigués existants, notamment rizicoles ; et (v) l’irrigation à vocation commerciale (marchés nationaux ou d’exportation) fondée sur des partenariats public-privé (PPP) et inscrite dans des pôles de croissance. C’est dans ce cadre qu’un programme régional d’appui à l’initiative pour l’irrigation dans le Sahel (PARIIS) a été formulé pour atteindre les objectifs fixés. A cet effet, la phase pilote dudit programme a obtenu du groupe de la Banque Mondiale un financement de 173 millions e dollars US pour la mise en œuvre des trois composantes que sont : ➢Composante A : Moderniser le cadre institutionnel et de planification : ➢Composante B : Financer des solutions d’irrigation : ➢Composante C : Renforcement des capacités, gestion des connaissances et coordination. vi L’Objectif de Développement du Projet est de renforcer la capacité des parties prenantes à développer et gérer l’irrigation et d’accroître les superficies irriguées en suivant une approche régionale basée sur les solutions dans six pays du Sahel. Le PARIIS Sénégal a un coût global estimé à environ 15 milliards FCFA. Les bénéficiaires du projet comprendront les agriculteurs qui bénéficieront directement des investissements sélectionnés financés dans le cadre du projet et indirectement de la capacité accrue des acteurs publics et privés pour offrir des services d'irrigation améliorés. Les autres bénéficiaires sont les ministères de tutelle et leurs services déconcentrés, les instituts de formation et de recherche et leurs étudiants, les opérateurs publics et privés impliqués dans le développement et la gestion de l'irrigation, les cabinets de consultants et entreprises de construction, les investisseurs dans l’agro-industrie, les fournisseurs d'équipements d'irrigation et les détaillants, et les organisations de producteurs. Compte tenu de la composition des systèmes d'irrigation prévus, environ 35% des bénéficiaires directs des aménagements irrigués devraient être des femmes1. Le projet aura pour but de pousser ce ratio à 45% en accordant une attention particulière à l'équilibre du genre dans toutes les activités du projet. Le dispositif de mise en œuvre du SIIP aux niveaux régional et national n'appuiera pas la création de nouvelles institutions, mais mettra plutôt l'accent sur le renforcement des institutions nationales existantes afin d’améliorer leur capacité de mise en œuvre. Cette approche donne de meilleurs résultats en termes de renforcement institutionnel. Le CILSS sera l'organisme d'exécution global du programme et sera principalement responsable de la coordination régionale, sous la supervision du Comité régional de pilotage existant des projets et programmes du CILSS (CRP). Au niveau du Sénégal, un ciblage géographique et stratégie a permis d’identifier trois grandes Zones d’Intervention Prioritaires (ZIP). Les choix ont été faits de manière consensuelle avec différents acteurs sur la base d’un certain nombre de critères. Il s’agit de la ZIP A (Vallée du fleuve Sénégal (fortement rizicole avec des PIV rizicoles) qui touche les deux Régions administratives que sont Saint-Louis et Matam. La ZIP B (Région naturelle de Casamance / Kolda-Sédhiou (marchés transfrontaliers très actifs) qui concerne les Régions de Kolda et de Sédhiou ; la ZIP C (Bassin arachidier / centre qui est une ancienne zone arachidière PIV et PPM féminins maraîchers sur des ressources en eau de surface ou sur des forages) qui s’étend dans les régions de Fatick ; Kaffrine et de Kaolack. La réalisation d’un tel projet doit répondre aux exigences des politiques de sauvegarde environnementale et sociale de la Banque Mondiale. Pour ce faire, et en accord avec la Banque mondiale, le projet a été classé en catégorie A de la Banque mondiale, l’équivalent de la catégorie 1 dans la législation sénégalaise en matière d’évaluation environnementale. Etant donné, que les détails (notamment les localisations des investissements physiques, la taille, etc.) du programme ne seront pas connus avant la présentation de la requête au Conseil d’Administration de la Banque mondiale, il est convenu de préparer les cadres de gestion qui définissent les mécanismes et procédures à appliquer pour identifier et gérer les impacts et risques du programme lorsque les détails susmentionnés seront connus pendant la mise en œuvre (après approbation par le CA de la Banque mondiale). Il s’agit de : (i) un cadre de gestion environnementale et sociale (CGES), le présent document qui est complété par ; (ii) un cadre de politique de réinstallation ; et (iii) un plan de gestion des pestes (PGP). Par ailleurs, le programme pouvant affecter les eaux internationales, le Gouvernement enverra une notification au Haut-Commissariat de l’OMVS le cas échéant, et informera la Banque conformément à sa politique sur les eaux internationales. Les objectifs spécifiques visés à travers le CGES sont les suivants : ➢assurer que les impacts environnementaux et sociaux durant les phases de préparation et de mise en œuvre des sous projets du programme sont évalués de façon appropriée et à temps pour que les mesures soient prises en compte dans le document de projet final, les documents d’appel d’offre, les contrats, les plans d’exécution approuvés par le maître d’ouvrage et pendant l’exécution des travaux; ➢fournir un mécanisme pour la consultation des populations potentiellement affectées ainsi que la société civile, les ONG; ➢divulguer les informations pertinentes aux populations potentiellement affectées par le projet ainsi qu’aux parties prenantes; et ➢assurer que la conformité vis-à-vis des Politiques de Sauvegarde est garantie durant la phase de mise en œuvre des sous-projets. Législation environnementale et sociale nationale La loi n°2001-01 du15 Janvier 2001 fait de l’évaluation environnementale un des outils d’aide à la décision pour les autorités compétentes chargé de l’environnement. Le décret n° 2001-282 du 22 Avril 2001 portant application du code de l’environnement est un instrument de mise en œuvre de la loi, à cet effet il fixe des obligations à la fois aux autorités, aux promoteurs de projet et programme. Selon l'impact potentiel, la nature, l'ampleur et la localisation du projet, les types de projets sont classés dans l'une des catégories suivantes: •catégorie 1: les projets sont susceptibles d'avoir des impacts significatifs sur l'environnement; une étude de l'évaluation des impacts sur l'environnement permettra d'intégrer les considérations environnementales dans l'analyse économique et financière du projet; cette catégorie exige une évaluation environnementale approfondie; •catégorie 2: les projets ont des impacts limités sur l'environnement ou les impacts peuvent être atténués en appliquant des mesures ou des changements dans leur conception; cette catégorie fait l'objet d'une analyse environnementale sommaire). Dans la liste des projets devant faire l’objet d’une étude d’impact environnemental et social (EIES) et relevant de la catégorie 1, figurent : les projets et programmes qui modifient profondément les pratiques utilisées dans l’agriculture et la pêche; l’exploitation des ressources en eau ; les projets entrepris dans des zones écologiquement très fragiles et les zones protégées ; les projets qui risquent d’exercer des effets nocifs sur les espèces de faune et de flore en péril ou leurs habitats critiques ou d’avoir des conséquences préjudiciables pour la diversité biologique et le transfert de populations (déplacement et réinstallation). Relèvent en revanche de la seconde catégorie : les petites et moyennes entreprises agro-industrielles ; irrigation et drainage de petite échelle; projets d’irrigation par eau de surface allant de 100 à 500 hectares, et par eau souterraine allant de 200 à 1.000 hectares. Les arrêtés relatifs aux études d’impacts : Le dispositif du Code de l’Environnement est complété par cinq arrêtés qui sont : •Arrêté n°009471 du 28 Novembre 2001 portant contenu de termes de référence des EIES ; •Arrêté n°009470 du 28 Novembre 2001 portant sur les conditions de délivrance de l’Agrément pour l’exercice de activités relatives aux études d’impact environnementaux ; •Arrêté n°009472 du 28/11/2001 portant contenu du rapport de l’EIES ; •Arrêté n°009468 du 28/11/2001 portant réglementation de la participation du public à l’étude d’impact environnemental ; •Arrêté n°009469 du 28/11/2001 portant organisation/fonctionnement du comité technique. Exigences de Politiques de sauvegardes de la Banque mondiale auxquelles répond le présent CGES Les politiques opérationnelles de la Banque Mondiale qui potentiellement pourraient être déclenchées sont les suivantes : •la PO 4.01 sur l’évaluation environnementale (le présent CGES et les ESIA subséquents fournissent les dispositions pertinentes); •la PO 4.04 sur les habitats naturels (les dispositions pertinentes sont en annexe dans ce CGES) ; •la PO 4.09 sur la gestion des pestes (un plan de gestion des pestes (PGPP) séparé est préparé en complément) ; •la PO 7.50 sur les eaux internationales (une notification est faite à l’OMVS); •la PO 4.12 sur la réinstallation involontaire (un cadre de politique de réinstallation (CPR) séparé est préparé en complément) ; •la PO 4.36 sur les forêts (les dispositions pertinentes sont en annexe dans ce CGES) ; •la PO 4.07 sur la gestion des ressources en eau (les dispositions nationales sur la GIRE et autres instruments sont présentés dans ce CGES à cette fin). Identification des enjeux environnementaux et sociaux s des différentes ZIP du Projet. Les principaux enjeux en fonction des ZIP sont rapportés dans le tableau ci-dessous. Analyse de la sensibilité des ZIP Enjeux ZIP Bassin du Fleuve ZIP Bassin arachidier ZIP Casamance Sénégal - Ressources en eau - Forte diminution de la - Présence de la - Forte pluviométrie ressource disponible nappe du (> 800 mm) (Eau de surface). - Scénarii maestrichtien salée - Avancée de la hydrologiques langue salée exceptionnels - Irrégularité / Faiblesse des crues entraînant la diminution significative des surfaces inondées - Baisse du renouvellement de la ressource (Eaux souterraines) - Sols - Persistance de la - Polarisation de 57% - Polarisation de 20% sécheresse des terres arables du des terres arables du pays. pays - Inondations - Dégradation très - Salinisation et - Dégradations des sols avancée des sols acidification des terres (baisse du potentiel ferrugineux tropicaux surtout au niveau des agricole des peu lessivés appelés « vasières et de certains sols, modification de bas-fonds sols dior » situés dans la biodiversité la partie nord du bassin écologique). arachidier Analyse de la sensibilité des ZIP Enjeux ZIP Bassin du Fleuve ZIP Bassin arachidier ZIP Casamance Sénégal - Dégradations des - Pauvreté des sols de en Basse Casamance et berges du fleuve plus en plus accentuée en Moyenne Sénégal avec la réduction du Casamance temps (Déforestation des - Perte de fertilité des berges, éboulement de jachère et sols liés aux feux de des berges, destruction l’insuffisance voire brousse, à l’érosion des berges pour la l’absence de la pluviale des plateaux et confection de briques fertilisation des terres terrasses et à artisanales) l’ensablement des - Vulnérabilité à l’érosion avec la rizières destruction du couvert végétal - Biodiversité - Forte dégradation - Disparition des - Léger recul des formations forestières Formations forestières formations avec l’extension des causée par des conditions climatiques ligneuses Périmètres agricoles et sévères naturelles l’exploitation du et une forte pression bois anthropozoogène - Exploitation - Réduction et frauduleuse du bois dégradation des zones vers la Gambie humides naturelles - Reconversion des - Modification du populations vers la paysage ichtyologique pêche eu égard à du fleuve depuis l’insécurité et pression l’implantation des sur les ressources halieutiques, en barrages particulier sur les espèces et aires protégés et utilisation de techniques de pêche non autorisées. Analyse de la sensibilité des ZIP Enjeux ZIP Bassin du Fleuve ZIP Bassin arachidier ZIP Casamance Sénégal - Santé humaine et - Recrudescence de La région connait animale certaines maladies toujours une hydriques humaines insuffisance dans la endémiques prise en charge (Paludisme, bilharziose sanitaire de sa intestinale, bilharziose population. En effet, urinaire, diarrhées) les effectifs du personnel soignant en - Risque de activité dans la zone ne propagation permettent pas de d’épidémies de satisfaire les normes de maladies hydriques l’organisation mondiale (Fièvre jaune, Choléra, de la santé Poliomyélite, Shigellose) (OMS) (ANSD, 2013). - Risque de maladies par intoxication chimique avec l’usage des pesticides (malformations congénitales, interruptions de grossesse, etc.). - Conflits sociaux Le développement de - Conflits de gestion L'insécurité et la la culture irriguée se des terres entre situation de crise qu’a superpose agricultures et éleveurs connue la région sont à actuellement aux l’origine d’une forte systèmes - Stratification agropastoraux économique au sensibilité sur préexistants, auxquels bénéfice des l’occupation des terres elle dispute l'espace et agricultures et ont induit des les forces actives, conflits sociaux latents - Pertes de terre des particulièrement dans (ANSD, populations la moyenne vallée. autochtones. 2013). L'insertion du Analyse de la sensibilité des ZIP Enjeux ZIP Bassin du Fleuve ZIP Bassin arachidier ZIP Casamance Sénégal périmètre irrigué dans le milieu et ses systèmes agropastoraux est encore loin d'être réalisée. Cette coexistence est marquée par des contraintes et des conflits divers, du fait du" choc’’ entre la logique et la rationalité des deux systèmes, l'irrigué et l'agropastoral Impacts/risques environnementaux et sociaux négatifs potentiels Activités Impacts Aménagements et - Risque de fragilisation et d’eutrophisation du fleuve par les activités agricoles ouvrages hydrauliques - Risque de perturbation des zones de frayères du fleuve structurants - Déforestation, dégradation des sols par érosion, destruction d’habitats lors des défrichements - Destruction de la microfaune et de la matière organique - Perte de terre de pâturage (empiétement sur des espaces sylvopastoraux) - Poussière et perturbation (phase travaux) - Augmentation rythme d’aménagement (menace sur l’élevage, de la pêche et sur l’AEP) Activités Impacts - Déforestation, dégradation des sols par érosion, destruction d’habitats lors des défrichements - Augmentation des maladies liées à l'eau - Forte pression sur le foncier et sur l’eau - Pertes éventuelles de revenus ou de biens durant les travaux - Risques de maladies comme les IST/VIH/SIDA Production végétale - Perte de la fertilité des sols - Pollution des eaux et des sols due aux pesticides et aux engrais - Nuisances sanitaires dues aux pesticides - Destruction des non cibles par les pesticides - Nuisances en cas d’utilisation de fumure organique non maîtrisée - Augmentation des maladies liées à l'eau - Accentuation des conflits agriculteurs-éleveurs pour l'accès à l'eau ou aux pâturages - Risques de maladies comme les IST/VIH/SIDA - risques de conflits d’usage (alimentation en eau potable, agriculture, élevage et pêche), risques de conflits fonciers entre autochtones et investisseurs allochtones Infrastructures - Poussière, bruit, pollution par les déchets de chantier, problème d’hygiène et (Stockage, de sécurité (accidents) liés aux travaux de construction des bâtiments conditionnement; - Défaut d’hygiène dans le conditionnement et la transformation Transformation ; Pistes d’accès - Perte de biodiversité sur l’axe du tracé et sur les sites d’emprunt de latérite aux zones de - Empiétement sur terre cultivable (pour les nouveaux tracés) production, lignes - Obstruction des chemins de ruissellement électriques - Risques d’accidents, nuisances (poussières, bruit) lors des travaux Activités Impacts Utilisation des - risque de dissémination incontrôlée des gènes dans la nature OGMs - risque de transmission de résistance par exemple aux mauvaises herbes - risque de perturbation de la biodiversité avec risque de sélection d’individus non contrôlables - risque d’accroissement de la perte de diversité génique des espèces cultivées - risque que les OGM (plantes transgéniques à haute valeur ajoutée) supplantent les espèces agricoles localement cultivées. - Risques au plan de la santé humaine et animale, (allergies, problèmes de fertilité, malformations congénitales, de toxicité et d'autres répercussions sur la santé humaine et animale) Gestion Environnementale et Sociale du PARIIS La mise en oeuvre de la stratégie au niveau opérationnel pourrait nécessiter des évaluations environnementales (études d’impact approfondies, analyses environnementales initiales), la prise en compte de simples mesures environnementales et sociales. Pour faciliter l’identification du type de travail environnemental à réaliser en fonction des enjeux liés aux sites d’implantation des ouvrages, la réalisation de ces évaluations au besoin et/ou la prise en compte de mesures environnementales et sociales dans la planification technique, le présent CGES propose une démarche axée sur la procédure nationale de réalisation des évaluations environnementales, complétée par un certain nombre de documents type notamment (i) la fiche de sélection environnementale et sociale, (ii) le check list des impacts et des mesures d’atténuation dans la conception et l’exploitation des systèmes d’irrigation, (iii) le check des impacts et des mesures d’atténuation dans la conception, la construction et l’exploitation des ouvrages (conduites principales du réseau d’irrigation, réservoirs au sol, système d’exhaure), (iv) un exemple de clauses environnementales et sociales type pour l’exécution des travaux et (v) un modèle de bordereau des prix, (vi) un modèle de rapport d’incidence ouvrage et exploitation. Les mesures stratégiques suivantes sont proposées pour prendre en charge les enjeux environnementaux et sociaux majeurs du projet. •Classification des sites d’implantation des activités dans les zones d’intervention du projet •Réalisation d’études environnementales et sociales (sur la base du screening détaillé plus loin dans le plan de gestion environnementale et social) et respect des sauvegardes environnementales et sociales. •Maintien des paysages et conservation des écosystèmes particuliers •Protection des systèmes de productions •Mise en place d’une politique d’accès à la terre et à l’eau •Prise en compte des groupes vulnérables et du genre dans l’accès à la terre et à l’eau •Articulation du projet avec les instruments de planification de la durabilité •Capitalisation de la gestion environnementale et sociale des autres programmes et coordination entre acteurs. •Les mesures organisationnelles et de renforcement de capacités des bénéficiaires •Programme de formation •Stratégie de communication et plan de consultation Organisation et Arrangements institutionnels pour la mise en œuvre du CGES Plusieurs institutions sont impliquées dans la mise en œuvre du CGES, principalement : •Le Comité de pilotage du programme : •Unité de mis en oeuvre du Programme (UP) : •La Direction de l’Environnement et des Etablissements Classés : •Les Collectivités locales ; •Associations de producteurs bénéficiaires. Les rôles et responsabilités sont proposé dans le tableau ci-dessous tenant compte de la réglementation en vigueur et des bonnes pratiques en matière de gestion environnementale et sociale des programmes/projets. Tableau 1 : Matrice des rôles et responsabilités (au regard de l’arrangement institutionnel de mise en oeuvre du CGES) No Etapes/Activités Responsable Appui/Collaboration Maître Vérification/Approbation d’œuvre 4. Identification de la UP Collectivités locales, UP localisation/site et DSP/ASUFOR, principales Caractéristiques CADL, SAED, technique du sousprojet 5. Sélection Spécialiste •Bénéficiaire; SSEP/UP •DREEC/DEEC Banque Sauvegarde mondiale Environnementale Environnementale •Mairies (Screening- et Sociale (SSES) de remplissage des l’UP formulaires), et détermination du type d’instrument spécifique de sauvegarde 6. Approbation de la Coordonnateur du SSES/UP •DREEC/DEEC Banque catégorisation par Projet mondiale l’entité chargée des EIE et la Banque 4.1 Préparation de l’instrument spécifique de sauvegarde E&S de sous-projet de catégorie A Préparation, SSES/UP SSEP/UP •DREEC/DEEC Banque mondiale approbation et publication des TDR Réalisation de Spécialiste passation Consultant l’étude y de marché (SPM); compris EN-EIE ; Maire consultation No Etapes/Activités Responsable Appui/Collaboration Maître Vérification/Approbation d’œuvre du public Validation du SPM, Maire •EN-EIE, •Comité Technique document et obtention du •Banque •Banque Mondiale certificat mondiale environnemental Publication du Coordonnateur •Media ; document •Banque mondiale 4.2 Préparation de l’instrument spécifique de sauvegarde E&S de sous-projet de catégorie B ou C Préparation et Spécialistes en Spécialiste passation SSES/UP DEEC Banque mondiale approbation des sauvegardes de marché (SPM); TDR environnementales et sociales (SSES) de Réalisation de l’UP DNACPN ; Consultant l’étude y compris agréé consultation du Maire public Validation du SPM, Maire •Comité De Comité Technique document et pilotage obtention du Banque certificat mondiale environnemental Publication du Coordonnateur •Media ; document •Banque mondiale 5. Intégration dans le Responsable •SSES dossier d’appel d’offres (DAO) du technique (RT) de •SPM l’activité No Etapes/Activités Responsable Appui/Collaboration Maître Vérification/Approbation d’œuvre sous-projet, de toutes les mesures de la phase des travaux contractualisables avec l’entreprise 6. Exécution/Mise en SSES •SPM •Consulta •DEEC/Comité Technique oeuvre des •RT nt mesures non •Responsable •ONG contractualisées avec financier (RF) •Autres l’entreprise de •Maire construction 7. Surveillance SSES •Spécialiste en Suivi- Bureau de DEEC/Comité Technique interne de la mise Evaluation (SSE) Contrôle en oeuvre des mesures E&S •RF •Mairie Diffusion du Coordonnateur SSES DEEC/Comité Technique rapport de surveillance interne Surveillance DEEC/Comité SSES  externe de la mise Technique en oeuvre des mesures E&S 8 Suivi SSES/UP •Autres SSES •Laboratoires environnemental et social •S-SE /centres spécialisés •ONG No Etapes/Activités Responsable Appui/Collaboration Maître Vérification/Approbation d’œuvre 9 Renforcement des SSES/UP •Autres SSES •Consultants •DEEC/Comité Technique capacités des •SPM •Structures acteurs en Publiques compétentes mise en oeuvre E&S 10 Audit de mise en SSES/UP •Autres SSES •Consultants •DEEC/Comité Technique oeuvre des •SPM mesures •S-SE E&S •EN-EIE •Maire NB : Les rôles et responsabilités tels que décrits ci-dessus seront intégrés dans le manuel d’exécution du projet (MEP). Dans le cadre de la mise en oeuvre du PCGES, il est recommandé au titre des arrangements institutionnels, les protocoles d’accord relatifs aux aspects suivants : - le suivi environnemental avec la DEEC ; - le suivi des ressources en eau avec la DGPRE ; •les études techniques et sociales complémentaires spécifiques aux sites d’implantation des systèmes d’irrigation, notamment celles relatives à l’hydrogéologie, au foncier, à la demande agricole, , entre autres, avec les services techniques compétents, notamment la DGPRE. Budget Le budget s’élève à la somme totale de 600 000 000 FCFA calculé sur la base des hypothèses et variables suivantes : •Deux (02) évaluations environnementales de catégorie A par ZIP ; •trois (03) études techniques spécifiques par ZIP Tableau 10- 1 : Budget de mise en œuvre du PCGES Poste Coût (FCFA) Plan de renforcement des capacités 210 000 000 Provisions pour études spécifiques à la détermination des situations de 180 000 000 référence pour le suivi environnemental et d’aide à la décision environnementale et sociale Provisions pour les évaluations environnementales et sociales 150 000 000 Coordination de la gestion environnementale et sociale 60 000 000 Coût Total 600 000 000 Ce budget sera affiné en fonction de l’évolution de la planification du projet et des négociations avec les différents partenaires. Consultations du public La participation du public lors de la conduite d’une évaluation environnementale constitue la démarche pertinente d’intégration du projet dans son contexte socioéconomique. Elle permet d’intégrer les avis et les commentaires des différents acteurs, notamment de la population locale et les services techniques, de manière interactive, de mesurer et de prendre en compte les impacts ou incidences du projet associés à sa mise en œuvre, afin d’en minimiser ou d’en éliminer les impacts négatifs et de bonifier les effets bénéfiques. Cette participation se fait sous forme : - de consultation publique c'est-à-dire de réunions et de rencontres au cours de l’étude, dans les localités concernées afin de recueillir les avis des populations ou de leurs représentants ; - d’audience publique qui est destinée à faire une large diffusion de l’étude terminée auprès des populations afin d’enregistrer les oppositions éventuelles et aussi les avis sur les solutions, propositions, recommandations et mesures d’atténuations contenues dans le rapport. C’est aussi une forme de restitution pour que les populations puissent vérifier si leurs avis, leurs opinions, leurs propositions et surtout leurs intérêts sont pris en compte.