Page 1 REPUBLIC OF PANAMA January 13, 1994 International Bank for Reconstruction and Development 1818 H Street, N.W. Washington D.C. 20433 Re: Loan No. 2686 PAN Roads Rehabilitation Project Supplemental Letter No. 1 Gentlemen: I refer to Sections 1.02 (f), 3.01 (a), 3.03 and 3.11 of the Loan Agreement (the Agreement) of even date herewith between the International Bank for Reconstruction and Development (the Bank) and the Republic of Panama (the Borrower) for the above project. The Implementation Letter therein referred to comprises the following documents, hereby attached: 1. A document designated "Project Implementation" (6 pages), together with the following attachments: (a) Attachment 1: Project Implementation Responsibilities (2 pages); (b) Attachment 2: Action Plan (5 pages); (c) Attachment 3: Key Performance Indicators (1 page); (d) Attachment 4: Subproject Implementation Scheduling (4 pages); (e) Attachment 5: Institutional Strengthening Component (1 page); and (f) Attachment 6: Overseas Training for Ministry of Public Works (MOP) staff (1 page). 2. A document designated "Interurban Transport Program" 3. A document designated "Urban Transport Program" Yours Respectfully REPUBLIC OF PANAMA By: Authorized Representative Page 2 Accepted: INTERNATIONAL BANK OF RECONSTRUCTION AND DEVELOPMENT By: ____________________________ Authorized Representative Date: ___________________________