Department of Water Supply and Sanitation, Punjab Website: www.pbdwss.gov.in PRWSSIP Procurement report Procurement Plan for Works Contract Status 'All' Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 South Zone Circle : Patiala Distt : Patiala Water Supply Division No. 1, Patiala PRWSSIP-Pla-Div-1-I 37.50 Post Plan Plan T/W and Civil Work NCB 31.12.14 31.1.15 10.2.15 Review 20.2.15 21.3.15 5.4.15 - - - - - 9.9.15 - - 1 Bhore 51.50 PRWSSIP-Pla-Div-1- 14.00 Post OHSR NCB 31.12.14 31.1.15 10.2.15 20.2.15 21.3.15 5.4.15 - - - - - 9.9.15 - - II Review PRWSSIP-Pla-Div-2-I 34.50 Post Plan T/W and Civil Work NCB 31.12.14 31.1.15 10.2.15 Review 20.2.15 21.3.15 5.4.15 - - - - - 9.9.15 - - 2 Achal 48.5 PRWSSIP-Pla-Div-2- 14.00 Post Plan OHSR NCB 31.12.14 31.1.15 10.2.15 20.2.15 21.3.15 5.4.15 - - - - - 9.9.15 - - II Review Division No. 2, Patiala PRWSSIP-Pla-Div-3-I Providing water 56.47 Chak Post Plan 1 56.47 supply chak NCB 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - Amaritsarian Review Amaritsarian PRWSSIP-Pla-Div-4-I 47.54 Post Plan 2 Balamgarh 47.54 Providing water NCB 28.02.15 30.04.15 01.06.15 Review 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - supply Balamgarh PRWSSIP-Pla-Div-5-I Providing water 60.87 Post Plan 3 Dhamo Majra 60.87 supply Dhamo NCB 28.02.15 30.04.15 01.06.15 Review 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - Majra PRWSSIP-Pla-Div-6-I 80.80 Post Plan 4 Asamanpur 80.80 Providing water NCB 28.02.15 30.04.15 01.06.15 Review 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - supply Asamanpur PRWSSIP-Pla-Div-7-I 32.18 Post Plan 5 Dharamgarh 32.18 Providing water NCB 28.02.15 30.04.15 01.06.15 Review 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - supply Dharamgarh PRWSSIP-Pla-Div-8-I Providing water 60.13 Post Plan 6 Dudhan Gujra 60.13 supply Dudhan NCB 28.02.15 30.04.15 01.06.15 Review 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - Gurjra PRWSSIP-Pla-Div-9-I Providing water 73.45 Post Plan 7 Khatouli 73.45 supply Dudhan NCB 28.02.15 30.04.15 01.06.15 Review 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - Khatouli Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Devi Nagar Urf PRWSSIP-Pla-Div-10- Providing water 76.00 I Post Plan 8 Swai singh 76.00 supplyDevi Nagar NCB 28.02.15 30.04.15 01.06.15 Review 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - wala Urf Swai Singh wala PRWSSIP-Pla-Div-11- Providing water 47.46 Post Plan 9 Dughat 47.46 I NCB 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - supply Dughat Review PRWSSIP-Pla-Div-12- Providing water 72.48 Post Plan 10 Rongla 72.48 NCB 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - I supply Rongla Review Division, Rajpura PRWSSIP-Pla- 55.00 T/Well, OHSR, Post Plan 1 Jhansla 55.00 Rajpura-Div-13-I NCB Dec-14 28.02.14 15.03.14 15.04.15 14.05.15 30.05.15 -- 10.06.15 -- -- -- 09.12.15 -- Distribution etc. Review PRWSSIP-Pla- 45.00 T/Well, OHSR, Post Plan 2 Salempur Nagal 45.00 Rajpura-Div-14-I NCB Dec-14 28.02.14 15.03.14 15.04.15 14.05.15 30.05.15 -- 10.06.15 -- -- -- 09.12.15 -- Distribution etc. Review PRWSSIP-Pla- T/Well, OHSR, 45.00 Post Plan Plan 3 Kohle Majra 45.00 NCB Dec-14 28.02.14 15.03.14 15.04.15 14.05.15 30.05.15 -- 10.06.15 -- -- -- 09.12.15 -- Rajpura-Div-15-I Distribution etc. Review PRWSSIP-Pla- T/Well, OHSR, 48.00 Post 4 Mehdudan 48.00 NCB Dec-14 28.02.14 15.03.14 15.04.15 14.05.15 30.05.15 -- 10.06.15 -- -- -- 09.12.15 -- Rajpura-Div-16-I Distribution etc. Review Performance Imporvement Schemes Division No. 1, Patiala PRWSSIP-Pla-Div- Repair of Water Kakrala (Improvement) / Post Plan 1 IMP-1-I works and 5.00 N.S. 31.12.14 1.1.15 10.2.15 20.2.15 2.3.15 10.3.15 N.A. 18.3.15 - - - 9.6.15 - - 5.00 Review Distribution Division No. 2, Patiala PRWSSIP-Pla-Div- Performance 8.25 Post Plan Plan Plan Plan 1 Khaspur 8.25 NS 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - 8.8.15 - - - 31.07.16 - - IMP-2-I Improvemen Review Mehma PRWSSIP-Pla-Div- Performance 7.92 Post 2 7.92 NS 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - 8.8.15 - - - 31.07.16 - - Walian IMP-3-I Improvemen Review PRWSSIP-Pla-Div- Performance 6.42 Post 3 Majri Akalian 6.42 NS 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - 8.8.15 - - - 31.07.16 - - IMP-4-I Improvemen Review PRWSSIP-Pla-Div- Performance 15.53 Post 4 Gajipur 15.53 NCB 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - 8.8.15 - - - 31.07.16 - - IMP-5-I Improvemen Review Division, Rajpura PRWSSIP-Pla- 4.91 Pumping Machinery, Post Plan 1 Lehlan 4.91 Rajpura-Div-IMP-6-I Dev. Of w/works NS Dec-14 28.02.14 15.03.14 Review 15.04.15 14.05.15 30.05.15 -- 10.06.15 -- -- -- 09.07.15 PRWSSIP-Pla- 4.69 Pumping Machinery, Post Plan 2 Matheran 4.69 Rajpura-Div-IMP-7-I Dev. Of w/works NS Dec-14 28.02.14 15.03.14 Review 15.04.15 14.05.15 30.05.15 -- 10.06.15 -- -- -- 09.07.15 Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-Pla- 4.85 Pumping Machinery, Post Plan 3 Jalalpur 4.85 Rajpura-Div-IMP-8-I Dev. Of w/works NS Dec-14 28.02.14 15.03.14 Review 15.04.15 14.05.15 30.05.15 -- 10.06.15 -- -- -- 09.07.15 PRWSSIP-Pla- 4.98 Pumping Machinery, Post Plan 4 Ajrour 4.98 Rajpura-Div-IMP-9-I Dev. Of w/works NS Dec-14 28.02.14 15.03.14 Review 15.04.15 14.05.15 30.05.15 -- 10.06.15 -- -- -- 09.07.15 PRWSSIP-Pla- 4.89 Pumping Machinery, Post Plan 5 Khaspur 4.89 Rajpura-Div-IMP-10- NS Dec-14 28.02.14 15.03.14 15.04.15 14.05.15 30.05.15 -- 10.06.15 -- -- -- 09.07.15 Dev. Of w/works Review I Sewerage Schemes Division No. 2, Patiala Sewerage PRWSSIP-Pla-Div- 400.00 Providing Sewerage Post Plan 1 Scheme 400.00 SW-1-I NCB 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - Scheme & STP Review Rakhra Distt. Fatehgarh Sahib Water Supply Division, Fatehgarh Sahib -- -- -- 1 Dera Mir 55.00 PRWSSIP-Pla-FGR- T/Well, OHSR, 55.00 31-01-2015 15-03-2015 30-03-2015 31-03-2015 30-04-2015 15-05-2015 -- 25-05- 31-03-2016 Plan Post Miran Div-17-I Distribution etc. NCB Review 2015 -- -- -- -- -- 2 Panjola 78.00 PRWSSIP-Pla-FGR- T/Well, OHSR, 78.00 NCB 31-01-2015 15-03-2015 30-03-2015 31-03-2015 30-04-2015 15-05-2015 -- 25-05- 31-03-2016 Plan Post Div-18-I Distribution etc. Review 2015 -- -- -- -- -- 3 Raipur Raian 72.00 PRWSSIP-Pla-FGR- T/Well, OHSR, 72.00 NCB 31-01-2015 15-03-2015 30-03-2015 31-03-2015 30-04-2015 15-05-2015 -- 25-05- 31-03-2016 Plan Post Div-19-I Distribution etc. Review 2015 -- -- -- -- -- 4 Hargana 74.00 PRWSSIP-Pla-FGR- T/Well, OHSR, 74.00 NCB 31-01-2015 15-03-2015 30-03-2015 31-03-2015 30-04-2015 15-05-2015 -- 25-05- 31-03-2016 Plan Post Div-20-I Distribution etc. Review 2015 -- -- -- -- -- 5 Diva Ganduan 68.00 PRWSSIP-Pla-FGR- T/Well, OHSR, 68.00 NCB 31-01-2015 15-03-2015 30-03-2015 31-03-2015 30-04-2015 15-05-2015 -- 25-05- 31-03-2016 Plan Post Div-21-I Distribution etc. Review 2015 -- -- -- -- -- 6 Khumna 90.00 PRWSSIP-Pla-FGR- T/Well, OHSR, 90.00 NCB 31-01-2015 15-03-2015 30-03-2015 31-03-2015 30-04-2015 15-05-2015 -- 25-05- 31-03-2016 Plan Post Div-22-I Distribution etc. Review 2015 -- -- -- -- -- Sewerage Schemes Distt. Fatehgarh Sahib 1 PRWSSIP-Pla-FGR- Providing Sewerage NCB 31-03-15 15-05-15 01-06-15 16-06-15 16-07-15 31-07-15 -- --- -- -- -- 31-07-16 -- -- Plan Dadiana 122.92 120.92 Post Div-SW-2-I Scheme & STP Review Circle :Bathinda Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 District Bathinda Water Supply Schemes Divn. No. 1, Bathinda 1 Jodhpur 122.05 PRWSSIP-BTD-Div- New water works 122.05 NCB 28/02/15 15/03/15 31/03/15 07/04/15 10/05/15 15/06/15 -- 30/06/15 -- -- -- 6/30/2015 -- -- Plan Plan Plan Plan Plan Plan Plan Plan Plan Post Romana 23-I Review 2 Gehri Bhagi 250.05 PRWSSIP-BTD-Div- New Water Works 250.05 NCB 28/02/15 15/03/15 31/03/15 Post 07/04/15 10/05/15 15/06/15 -- 30/06/15 -- -- -- 6/30/2015 -- -- 24-I Review 3 Gehri Butter 163.36 PRWSSIP-BTD-Div- Augmentation of 163.36 NCB 28/02/15 15/03/15 31/03/15 Post 07/04/15 10/05/15 15/06/15 -- 30/06/15 -- -- -- 6/30/2015 -- -- 25-I Water works Review 4 Balhar Mehma 184.18 PRWSSIP-BTD-Div- New Water Works 184.18 NCB 28/02/15 15/03/15 31/03/15 Post 07/04/15 10/05/15 15/06/15 -- 30/06/15 -- -- -- 6/30/2015 -- -- 26-I Review 5 Kalyan Malki 98.34 PRWSSIP-BTD-Div- New Water Works 85.09 NCB 28/02/15 15/03/15 31/03/15 Post 07/04/15 10/05/15 15/06/15 -- 30/06/15 -- -- -- 6/30/2015 -- -- 27-I Review 6 Harraipur 231.35 PRWSSIP-BTD-Div- New Water Works 231.35 NCB 28/02/15 15/03/15 31/03/15 Post 07/04/15 10/05/15 15/06/15 -- 30/06/15 -- -- -- 6/30/2015 -- -- 28-I Review 7 Sekhu 191.16 PRWSSIP-BTD-Div- Augmentation of 191.16 NCB 28/02/15 15/03/15 31/03/15 Post 07/04/15 10/05/15 15/06/15 -- 30/06/15 -- -- -- 6/30/2015 -- -- 29-I Water works Review 8 Kutti 5.00 PRWSSIP-BTD-Div- Performance 5.00 NS 28/02/15 15/03/15 31/03/15 Post 07/04/15 10/05/15 15/06/15 -- 30/06/15 -- -- -- 6/30/2015 -- -- IMP-11-I Improvement Review 9 Chak Bakhtu 5.00 PRWSSIP-BTD-Div- Performance 5.00 NS 28/02/15 15/03/15 31/03/15 Post 07/04/15 10/05/15 15/06/15 -- 30/06/15 -- -- -- 6/30/2015 -- -- IMP-12-I Improvement Review Divn. No. 2, Bathinda 1 Golewala 52.56 PRWSSIP-BTD-Div- New water works 52.56 NCB -- 10/02/15 15/02/15 01/03/15 31/03/15 30/04/15 --- 15/05/15 -- -- -- 5/15/2016 -- -- Plan Plan Plan Plan Plan Plan Plan Plan Post 32-I Review 2 Mannwala 106.30 PRWSSIP-BTD-Div- New Water Works 106.30 NCB -- 10/02/15 15/02/15 Post 01/03/15 31/03/15 30/04/15 --- 15/05/15 -- -- -- 5/15/2016 -- -- 33-I Review 3 Daultpura 61.68 PRWSSIP-BTD-Div- Augmentation of 61.68 NCB -- 10/02/15 15/02/15 Post 01/03/15 31/03/15 30/04/15 --- 15/05/15 -- -- -- 3/15/2016 -- -- 34-I Water works Review 4 Ram Niwas 124.85 PRWSSIP-BTD-Div- New Water Works 124.85 NCB -- 10/02/15 15/02/15 Post 01/03/15 31/03/15 30/04/15 --- 15/05/15 -- -- -- 5/15/2016 -- -- 35-I Review 5 Dhapali Khurd 98.34 PRWSSIP-BTD-Div- New Water Works 98.34 NCB -- 10/02/15 15/02/15 Post 01/03/15 31/03/15 30/04/15 --- 15/05/15 -- -- -- 5/15/2016 -- -- 36-I Review 6 Kothe Sukha 9.50 PRWSSIP-BTD-Div- New Water Works 9.50 NCB -- 10/02/15 15/02/15 Post 01/03/15 31/03/15 30/04/15 --- 15/05/15 -- -- -- 11/15/2015 -- -- Nand 37-I Review 7 Mahi Nangal 5.00 PRWSSIP-BTD-Div- Perfomance 5.00 NS -- 10/02/15 15/02/15 Post 01/03/15 31/03/15 30/04/15 --- 15/05/15 -- -- -- 8/15/2015 -- -- IMP-13-I Improvement Review 8 Burj Gill 5.00 PRWSSIP-BTD-Div- Perfomance 5.00 NS -- 10/02/15 15/02/15 Post 01/03/15 31/03/15 30/04/15 --- 15/05/15 -- -- -- 8/15/2015 -- -- IMP-14-I Improvement Review Divn. No. 3, Bathinda 1 Jodhpur -- PRWSSIP-BTD-Div- Aug.of w/s 258.15 NCB -- 20.2.15 28.2.15 16-3-15 16-4-15 15-5-15 21-5-15 30-5-15 -- -- -- 31.5.16 -- -- Plan Post Pakhar 40-I scheme Review Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 2 Ghaso Khana -- PRWSSIP-BTD-Div- Performance 3.38 NS -- 20.2.15 28.2.15 16.3.15 16.4.15 30.4.15 Nil 7.5.15 -- -- -- 30.6.15 -- -- Plan Post IMP-15-I Improvement w/s Review scheme 3 Hamirgarh -- PRWSSIP-BTD-Div- Prov.Sewerage 334.70 NCB -- 30.4.15 28.5.15 16-5-15 16-6-15 15-7-15 21-7-15 30-7-15 -- -- -- 31-5-16 -- -- Plan Post 42-I scheme Review District Mansa Divn. No. 1, Mansa 1 Dalie wali 164.16 PRWSSIP-Mansa-Div- Prov. Independent 164.16 NCB --- 10/2/15 15/2/15 1/3/15 7/4/15 30/4/15 5/5/15 15/5/15 --- --- --- 15-May-16 --- --- Plan 43-I W/S Scheme Post Review 2 Kotra 158.58 PRWSSIP-Mansa-Div- Prov. Independent 158.58 NCB --- 10/2/15 15/2/15 1/3/15 7/4/15 30/4/15 5/5/15 15/5/15 --- --- --- 15-May-16 --- --- 44-I Plan W/S Scheme Post Review 3 Gharagna 258.22 PRWSSIP-Mansa-Div- Prov. Independent 258.22 NCB --- 10/2/15 15/2/15 1/3/15 7/4/15 30/4/15 5/5/15 15/5/15 --- --- --- 15-May-16 --- --- Plan W/S Scheme Post 45-I Review 4 Uddat bhagat 15.00 PRWSSIP-Mansa-Div- Prov. Performance 15.00 NCB --- 10/2/15 15/2/15 1/3/15 7/4/15 30/4/15 5/5/15 15/5/15 --- --- --- 15-Jul-15 --- --- Plan ram improvement Post IMP-15-I Review Divn. No. 2, Mansa 1 Bhupal Kallan 150.00 PRWSSIP-Mansa-Div- Const. of Seprate 150.00 NCB -- 10/02/15 15/02/15 01/03/15 07/04/15 30/04/15 05/05/15 15/05/15 -- -- -- 5/31/2016 -- -- Plan Water Works Post 47-I Review 2 Kishangarh 175.00 PRWSSIP-Mansa-Div- Const. of Seprate 175.00 NCB -- 10/02/15 15/02/15 01/03/15 07/04/15 30/04/15 05/05/15 15/05/15 -- -- -- 5/31/2016 -- -- Plan pharmahi Water Works Post 48-I Review 3 Gandhu khurd 158.31 PRWSSIP-Mansa-Div- Const. of Seprate 158.31 NCB -- 10/02/15 15/02/15 01/03/15 07/04/15 30/04/15 05/05/15 15/05/15 -- -- -- 5/31/2016 -- -- Plan Water Works Post 49-I Review 4 Ramgarh 144.53 PRWSSIP-Mansa-Div- Const. of Seprate 144.53 NCB -- 10/02/15 15/02/15 01/03/15 07/04/15 30/04/15 05/05/15 15/05/15 -- -- -- 5/31/2016 -- -- Plan dariapur Water Works Post 50-I Review 5 Bhawa 194.94 PRWSSIP-Mansa-Div- Const. of Seprate 194.94 NCB -- 10/02/15 15/02/15 01/03/15 07/04/15 30/04/15 05/05/15 15/05/15 -- -- -- 5/31/2016 -- -- Plan Water Works Post 51-I Review 6 Mangania 165.00 PRWSSIP-Mansa-Div- Const. of Seprate 165.00 NCB -- 10/02/15 15/02/15 01/03/15 07/04/15 30/04/15 05/05/15 15/05/15 -- -- -- 5/31/2016 -- -- Plan Water Works Post 52-I Review 7 Birewala 170.00 PRWSSIP-Mansa-Div- Const. of Seprate 170.00 NCB -- 10/02/15 15/02/15 01/03/15 07/04/15 30/04/15 05/05/15 15/05/15 -- -- -- 5/31/2016 -- -- Plan Dogra Water Works Post 53-I Review Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 8 Hero kallan 5.00 PRWSSIP-Mansa-Div- Improvement of 5.00 NS -- 10/02/15 15/02/15 01/03/15 07/04/15 30/04/15 05/05/15 15/05/15 -- -- -- 10/31/2015 -- -- Plan W/S Scheme Post IMP-16-I Review 9 Ralli 40.00 PRWSSIP-Mansa-Div- Improvement of 40.00 NCB -- 10/02/15 15/02/15 01/03/15 07/04/15 30/04/15 05/05/15 15/05/15 -- -- -- 10/31/2015 -- -- Plan W/S Scheme Post IMP-17-I Review Circle :Sangrur District Sangrur Water Supply Schemes Div. Sangrur PRWSSIP-SGR-Div- 67.00 56-I New T/w, Pipeline Bifurcation W/S Distribuation Balad Khurd Post Plan 67.00 System, NCB 31.03.2015 30.4.2015 15.05.15 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Block Review Construction Pump Bhawanigarh 1 Chamber etc Bifurcation W/S PRWSSIP-SGR-Div- 20.00 Balad Khurd 56-II Construction of RCC Post Plan 20.00 NCB 31.03.2015 30.4.2015 15.05.15 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Block OHSR Review Bhawanigarh PRWSSIP-SGR-Div- 65.00 57-I New T/w, Pipeline Bifurcation W/S Distribuation System, Post Plan RaitgarhBlock 65.00 NCB 31.03.2015 30.4.2015 15.05.15 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Construction Pump Review Bhawanigarh Chamber 2 PRWSSIP-SGR-Div- 17.00 Bifurcation W/S 57-II Construction of RCC Post Plan RaitgarhBlock 17.00 NCB 31.03.2015 30.4.2015 15.05.15 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- OHSR Review Bhawanigarh PRWSSIP-SGR-Div- New T/w, Pipeline 60.00 Bifurcation W/S 58-I Distribuation Post Plan Gulahri Block 60.00 System, NCB 31.03.2015 30.4.2015 15.05.15 Review 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Andana Construction Pump 3 Chamber Bifurcation W/S PRWSSIP-SGR-Div- 20.00 58-II Construction of RCC Post Plan Gulahri Block 20.00 NCB 31.03.2015 30.4.2015 15.05.15 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- OHSR Review Andana PRWSSIP-SGR-Div- 40.00 Bifurcation W/S 59-I New T/w, Pipeline Ghamourghat Distribuation Post Plan Block Andana 40.00 System, NCB 31.03.2015 30.4.2015 15.05.15 Review 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- for Rs 40.00 Construction Pump Lacs Chamber etc 4 Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Bifurcation W/S PRWSSIP-SGR-Div- 20.00 Ghamourghat 59-II Construction of RCC Post Plan Block Andana 20.00 NCB 31.03.2015 30.4.2015 15.05.15 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- OHSR Review for Rs 20.00 Lacs PRWSSIP-SGR-Div- 55.00 60-I New T/w, Pipeline Bifurcation W/S Distribuation Post Plan Rorewal Block 55.00 System, NCB 31.03.2015 30.4.2015 15.05.15 Review 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Lehragaga Construction Pump 5 Chamber PRWSSIP-SGR-Div- New T/w, Pipeline 20.00 Bifurcation W/S 60-II Distribuation Post Plan Rorewal Block 20.00 System, NCB 31.03.2015 30.4.2015 15.05.15 Review 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Lehragaga Construction Pump Chamber PRWSSIP-SGR-Div- New T/w, Pipeline 95.00 Bifurcation W/S 61-I Distribuation Post Plan Ubhawal Block 95.00 System, NCB 31.03.2015 30.4.2015 15.05.15 Review 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Sangrur Construction Pump Chamber 6 PRWSSIP-SGR-Div- New T/w, Pipeline 25.00 Bifurcation W/S 61-II Distribuation Post Plan Ubhawal Block 25.00 System, NCB 31.03.2015 30.4.2015 15.05.15 Review 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Sangrur Construction Pump Chamber PRWSSIP-SGR-Div- New T/w, Pipeline 80.00 Bifurcation W/S 62-I Distribuation Post Plan Khanal Khurd 80.00 System, NCB 31.03.2015 30.4.2015 15.05.15 Review 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Block Sunam Construction Pump Chamber 7 PRWSSIP-SGR-Div- New T/w, Pipeline 20.00 Bifurcation W/S 62-II Distribuation Post Plan Khanal Khurd 20.00 System, NCB 31.03.2015 30.4.2015 15.05.15 Review 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Block Sunam Construction Pump Chamber PRWSSIP-SGR-Div- 40.00 New T/w, Pipeline Bifurcation W/S 63-I Distribuation Post Plan Khokhar Block 40.00 System, NCB 31.03.2015 30.4.2015 15.05.15 Review 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Lehragaga Construction Pump Chamber 8 Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 8 PRWSSIP-SGR-Div- New T/w, Pipeline 20.00 Bifurcation W/S 63-II Distribuation Post Plan Khokhar Block 20.00 System, NCB 31.03.2015 30.4.2015 15.05.15 Review 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Lehragaga Construction Pump Chamber PRWSSIP-SGR-Div- New T/w, Pipeline 50.00 Bifurcation W/S 64-I Distribuation Post Plan Toorbanjara 50.00 System, NCB 31.03.2015 30.4.2015 15.05.15 Review 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Block Sunam Construction Pump Chamber 9 PRWSSIP-SGR-Div- New T/w, Pipeline 20.00 Bifurcation W/S 64-II Distribuation Post Plan Toorbanjara 20.00 System, NCB 31.03.2015 30.4.2015 15.05.15 Review 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Block Sunam Construction Pump Chamber WSS, Division Malerkotla PRWSSIP-SGR-MLKT- T/W, Machinery & 16.00 Bifurcation W/S Div-64-I Const. of Pump NCB 15/03/15 15/04/15 30/04/15 Post Review 15/05/15 15/06/15 30/06/15 Post Review 22/07/15 - - - 10/21/2015 - - Scheme Dheero Chamber Plan 1 82.70 Majra Block PRWSSIP-SGR-MLKT- Civil Work, 66.70 Malerkotla-I Distribution System NCB 15/03/15 30/04/15 15/05/15 Post Review 31/05/15 30/06/15 15/07/15 Post Review 07/08/15 - - - 2/6/2016 - - Div-64-II & OHSR PRWSSIP-SGR-MLKT- T/W, Machinery & 15.50 Bifurcation W/S Div-65-I Const. of Pump NCB 15/03/15 15/04/15 30/04/15 Post Review 15/05/15 15/06/15 30/06/15 Post Review 22/07/15 - - - 10/21/2015 - - Plan 2 Scheme Jainpur 75.00 Chamber PRWSSIP-SGR-MLKT- Civil Work, 59.50 Block Malerkotla-I Distribution System NCB 15/03/15 30/04/15 15/05/15 Post Review 31/05/15 30/06/15 15/07/15 Post Review 07/08/15 - - - 2/6/2016 - - Div-65-II & OHSR PRWSSIP-SGR-MLKT- T/W, Machinery & 16.00 Bifurcation W/S Div-66-I Const. of Pump NCB 15/03/15 15/04/15 30/04/15 Post Review 15/05/15 15/06/15 30/06/15 Post Review 22/07/15 - - - 10/21/2015 - - Scheme Faridpur Chamber Plan 3 76.75 Kalan Block PRWSSIP-SGR-MLKT- Civil Work, 60.75 Malerkotla-II Distribution System NCB 15/03/15 30/04/15 15/05/15 Post Review 31/05/15 30/06/15 15/07/15 Post Review 07/08/15 - - - 2/6/2016 - - Div-66-II & OHSR PRWSSIP-SGR-MLKT- T/W, Machinery & 16.00 Bifurcation W/S Div-67-I Const. of Pump NCB 15/03/15 15/04/15 30/04/15 Post Review 15/05/15 15/06/15 30/06/15 Post Review 22/07/15 - - - 10/21/2015 - - Scheme Chamber Plan 4 75.60 Hussainpura Block PRWSSIP-SGR-MLKT- Civil Work, 59.60 Malerkotla-II Distribution System NCB 15/03/15 30/04/15 15/05/15 Post Review 31/05/15 30/06/15 15/07/15 Post Review 07/08/15 - - - 2/6/2016 - - Div-67-II & OHSR PRWSSIP-SGR-MLKT- T/W, Machinery & 16.00 Bifurcation W/S Div-68-I Const. of Pump NCB 15/03/15 15/04/15 30/04/15 Post Review 15/05/15 15/06/15 30/06/15 Post Review 22/07/15 - - - 10/21/2015 - - Chamber Plan 5 Scheme ISSI Block 78.50 Dhuri PRWSSIP-SGR-MLKT- Civil Work, 62.50 Div-68-II Distribution System NCB 15/03/15 30/04/15 15/05/15 Post Review 31/05/15 30/06/15 15/07/15 Post Review 07/08/15 - - - 2/6/2016 - - & OHSR Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-SGR-MLKT- T/W, Machinery & 15.00 Bifurcation W/S Div-69-I Const. of Pump NCB 15/03/15 15/04/15 30/04/15 Post Review 15/05/15 15/06/15 30/06/15 Post Review 22/07/15 - - - 10/21/2015 - - Scheme Ruldu Chamber Plan 6 70.45 Singh Wala Block PRWSSIP-SGR-MLKT- Civil Work, 55.45 Dhuri Distribution System NCB 15/03/15 30/04/15 15/05/15 Post Review 31/05/15 30/06/15 15/07/15 Post Review 07/08/15 - - - 2/6/2016 - - Div-69-II & OHSR District Barnala Div. Barnala 75.00 PRWSSIP-Barnala- New T/w, Pipeline 75.00 Augmentation W/S Div-70-I Distribuation Post Plan 1 Badbar Block System, NCB 31.03.2015 30.4.2015 15.05.15 Review 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Barnala Construction Pump Chamber 25.00 PRWSSIP-Barnala- Construction of RCC 25.00 Prov W/S Badbar II Post Plan 2 NCB 31.03.2015 30.4.2015 15.05.15 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Block Barnala Div-70-II OHSR Review 55.00 PRWSSIP-Barnala- New T/w, Pipeline 55.00 Bifurcation W/S Div-71-I Distribuation Post Plan 3 Pharwahi Block System, NCB 31.03.2015 30.4.2015 15.05.15 Review 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Barnala Construction Pump Chamber Bifurcation W/S 20.00 PRWSSIP-Barnala- Construction of RCC 20.00 Post Plan 4 Pharwahi Block NCB 31.03.2015 30.4.2015 15.05.15 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Barnala Div-71-II OHSR Review 40.00 PRWSSIP-Barnala- New T/w, Pipeline 40.00 Augmentation W/S Div-72-I Distribuation Post Plan 5 Hardaspur Block System, NCB 31.03.2015 30.4.2015 15.05.15 Review 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Mehal Kalan Construction Pump Chamber Augmentation W/S 20.00 PRWSSIP-Barnala- 20.00 Construction of RCC Post Plan 6 Hardaspur Block Div-72-II NCB 31.03.2015 30.4.2015 15.05.15 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Mehal Kalan OHSR Review 40.00 PRWSSIP-Barnala- 40.00 New T/w, Pipeline Div-73-I Distribuation Augmentation W/S Post Plan 7 Gumti Block Barnala System, NCB 31.03.2015 30.4.2015 15.05.15 Review 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Construction Pump Chamber 20.00 PRWSSIP-Barnala- Construction of RCC 20.00 Augmentation W/S Post Plan 8 NCB 31.03.2015 30.4.2015 15.05.15 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Gumti Block Barnala Div-73-II OHSR Review 30.00 PRWSSIP-Barnala- 30.00 New T/w, Pipeline Augmentation W/s Div-74-I Distribuation Post Plan 9 Ramgarh Block System, NCB 31.03.2015 30.4.2015 15.05.15 Review 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Sehna Construction Pump Chamber Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 30.00 PRWSSIP-Barnala- New T/w, Pipeline 30.00 Augmentation W/s Div-74-II Distribuation Post Plan 10 Bhaini Jassa Block System, NCB 31.03.2015 30.4.2015 15.05.15 Review 30.05.15 30.06.15 15.07.15 Post Review 6.08.15 -- -- -- 6.02.2016 -- -- Sehna Construction Pump Chamber SAFE AND TREATED SURFACE WATER TO DISTRICT BARNALA 1 10078 PRWSSIP-Barnala- PROVIDING 10078 NCB DONE 15-Mar-15 31-04-2015 10-05.15 12/05/15 31-06-2015 15/08/15 25.08.2015 1-Sep-15 - - - 31-05-17 - - Plan SURFACE WATER SUPPLY Div-212-II SURFACE WATER TO 36 VILLAGES OF BLOCK- SUPPLY TO 36 MAHELKALAN QUALITY AFFECTED DISTRICT VILLAGES OF BLOCK BARNALA MEHALKELAN District Ludhiana Water Supply Schemes DIV 1 LUDHIANA PRWSSIP-Ldh-Div- Installation pf 38 Plan 75-I T/well. Const. of Post 1 Basowal 43.00 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 40 Plan 76-I T/well. Const. of Post 2 Bhadewal 45.00 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 90 Plan Daad and its 77-I T/well. Const. of Post 3 95.00 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 other habitations Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 62 Plan 78-I T/well. Const. of Post 4 Dhatt 67.00 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 32 Plan 79-I T/well. Const. of Post 5 Gursur 37.00 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 158 Plan 80-I T/well. Const. of Post 6 Hans Kalan 163.00 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 131 Plan 81-I T/well. Const. of Post 7 Jandiali 136.00 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-Ldh-Div- Installation pf 70 Plan 82-I T/well. Const. of Post 8 Kannia Khurd 75.00 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 41 Plan 83-I T/well. Const. of Post 9 Ramgarh Sibian 46.00 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 108 Plan 84-I T/well. Const. of Post 10 Phullanwal 113.00 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 53 Plan Post 11 Pheruarian 58.00 85-I T/well. Const. of NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 77 Plan 86-I T/well. Const. of Post 12 Thakkarwal 82.00 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 155 Plan 87-I T/well. Const. of Post 13 Dhandra 160.00 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 99 Plan 88-I T/well. Const. of Post 14 Malik 104.00 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. DIV 2 Ludhiana PRWSSIP-Ldh-Div- Installation pf 45 89-I Plan T/well. Const. of Post 15 Daulatpur 50 NCB 15/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 43 90-I Plan T/well. Const. of Post 16 Khaira Bet 48 NCB 15/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 35 91-I Plan T/well. Const. of Post 17 Garhi Sheru 41 NCB 15/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 40 92-I Plan T/well. Const. of Post 18 Garhi Toger 44 NCB 15/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 38 93-I Plan T/well. Const. of Post 19 Jonewal 42 NCB 15/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-Ldh-Div- Installation pf 30 94-I Plan Fatehgarh T/well. Const. of Post 20 33 NCB 25/1/15 5/2/15 12/2/2015 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 Gujjran Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 30 95-I Plan T/well. Const. of Post 21 Machhian Khurd 33 NCB 25/1/15 5/2/15 12/2/2015 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 31 96-I Plan T/well. Const. of Post 22 Selkiana 34 NCB 25/1/15 5/2/15 12/2/2015 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 50 97-I Plan T/well. Const. of Post 23 Khasi Khurd 53 NCB 25/1/15 5/2/15 12/2/2015 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 30 98-I Plan T/well. Const. of Post 24 Rawat 34 NCB 25/1/15 5/2/15 12/2/2015 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 30 99-I Plan T/well. Const. of Post 25 Garcha 34 NCB 25/1/15 5/2/15 12/2/2015 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 30 100-I Plan T/well. Const. of Post 26 Jhuggian Kadar 34 NCB 25/1/15 5/2/15 12/2/2015 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 30 101-I Plan T/well. Const. of Post 27 Baisami 34 NCB 15/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 28 102-I Plan T/well. Const. of Post 28 Garhi Bet 30 NCB 15/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 60 Jagirpur 103-I Plan T/well. Const. of Post 29 (Namdev 66 NCB 15/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Colony) Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 85 104-I Plan Meharban T/well. Const. of Post 30 90 NCB 18/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 (Walia Vihar) Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 66 105-I Plan T/well. Const. of Post 31 Kakowal 70 NCB 18/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-Ldh-Div- Installation pf 95 106-I Plan T/well. Const. of Post 32 Bhamian Khurd 100 NCB 18/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 30 107-I Plan T/well. Const. of Post 33 Bhupana 34 NCB 18/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 35 108-I Plan T/well. Const. of Post 34 Rajgarh 40 NCB 20/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 45 109-I Plan T/well. Const. of Post 35 Rattowal 50 NCB 20/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 85 110-I Plan T/well. Const. of Post 36 Pakhowal 90 NCB 20/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 40 111-I Plan T/well. Const. of Post 37 Meherna Kalan 45 NCB 20/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 40 112-I Plan T/well. Const. of Post 38 Juharhan 45 NCB 20/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 30 113-I Plan T/well. Const. of Post 39 Akalgarh 35 NCB 20/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 50 114-I Plan T/well. Const. of Post 40 Tibba 55 NCB 22/1/15 5/2/15 12/2/2015 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 38 115-I Plan T/well. Const. of Post 41 Bhamman Khurd 43 NCB 22/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 34 116-I Plan Boothgarh T/well. Const. of Post 42 38 NCB 22/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Jattan Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 35 117-I Plan T/well. Const. of Post 43 Karor 39 NCB 22/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-Ldh-Div- Installation pf 35 118-I Plan T/well. Const. of Post 44 Pirthipur 39 NCB 22/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 35 119-I Plan T/well. Const. of Post 45 Gujjarwal Bet 40 NCB 24/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 35 120-I Plan T/well. Const. of Post 46 Sanghe 40 NCB 24/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 50 121-I Plan T/well. Const. of Post 47 Sasrali 55 NCB 24/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 35 122-I Plan T/well. Const. of Post 48 Sherrian 40 NCB 25/1/15 5/2/15 12/2/2015 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 30 123-I Plan T/well. Const. of Post 49 Bholapur 35 NCB 25/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 30 124-I Plan T/well. Const. of Post 50 Ghumait 35 NCB 25/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 30 125-I Plan T/well. Const. of Post 51 PHARUWAL 35 NCB 25/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 50 126-I Plan T/well. Const. of Post 52 Arraian 55 NCB 25/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 50 127-I Plan T/well. Const. of Post 53 Jamalpur Lilly 55 NCB 25/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 40 128-I Plan T/well. Const. of Post 54 Mand Chounta 45 NCB 28/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 50 129-I Plan T/well. Const. of Post 55 Bajra 55 NCB 28/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-Ldh-Div- Installation pf 40 130-I Plan T/well. Const. of Post 56 Bajra Colony 45 NCB 28/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 50 131-I Plan T/well. Const. of Post 57 Noorwala 55 NCB 28/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 50 132-I Plan T/well. Const. of Post 58 Gaddapur 55 NCB 28/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 36 133-I Plan T/well. Const. of Post 59 Sekha 44 NCB 18/1/15 31/1/15 3/2/2015 20/2//15 22/3/15 4/4/15 --- 10/4/15 31/3/16 Chamber,OHSr Review Pipe Line etc. DIV 3 LUDHIANA PRWSSIP-Ldh-Div- Installation pf 62 Plan 134-I T/well. Const. of Post 60 Baniewal 67 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 64 Plan 135-I T/well. Const. of Post 61 Kul gahina 69 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 112 Plan 136-I T/well. Const. of Post 62 Leelan 117 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 72 Plan 137-I T/well. Const. of Post 63 Lodhiwala 77 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 27 Plan 138-I T/well. Const. of Post 64 Madhepura 32 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 4 Plan 139-I T/well. Const. of Post 65 Safipura 9 NS 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 165 Plan 140-I T/well. Const. of Post 66 Sherpur Kalan 170 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 147 Plan Swadi Kalan 141-I T/well. Const. of Post 67 152 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 (Main) Chamber,OHSr Review Pipe Line etc. Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-Ldh-Div- Installation pf 37 Plan 142-I T/well. Const. of Post 68 Galib Khurd 42 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh-Div- Installation pf 33 Plan 143-I T/well. Const. of Post 69 Galib Ran Singh 38 NCB 1/4/2015 15/4/15 30/4/15 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. DIV Khanna PRWSSIP-Ldh- Installation pf 41 Plan 70 Barmalipur 46 Khanna-Div-144-I T/well. Const. of NCB 1/4/2015 15/4/15 30/4/15 Post 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh- Installation pf 77 Plan 71 Kauri 82 Khanna-Div-145-I T/well. Const. of NCB 1/4/2015 15/4/15 30/4/15 Post 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh- Installation pf 62 Plan 72 Khaira Bet 67 Khanna-Div-146-I T/well. Const. of NCB 1/4/2015 15/4/15 30/4/15 Post 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh- Installation pf 27 Plan 73 Kot Sekha 32 Khanna-Div-147-I T/well. Const. of NCB 1/4/2015 15/4/15 30/4/15 Post 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. PRWSSIP-Ldh- Installation pf 41 Plan 74 Gidri 46 Khanna-Div-148-I T/well. Const. of NCB 1/4/2015 15/4/15 30/4/15 Post 15/6/15 30/6/15 15/8/15 --- 15/2/16 31/3/16 Chamber,OHSr Review Pipe Line etc. Sewerage Schemes DIV 1 LUDHIANA 1 Bhanohar PRWSSIP-Ldh-Div- Sewer scheme 260 NCB 15/1/15 31/1/15 5/2/2015 25/2/15 28/3/15 4/4/2015 ---- ######## 31/3/16 Plan Post 275 SW-3-I and Sewerage Review Treatment Plant 2 Gill and its PRWSSIP-Ldh-Div- Sewer scheme 165 NCB 15/1/15 31/1/15 5/2/2015 25/2/15 28/3/15 4/4/2015 ---- ######## 31/3/16 SW-4-I and Sewerage Plan abadies Guru Post 169 Treatment Plant Review nanak Nagar 3 PRWSSIP-Ldh-Div- Sewer scheme 290 NCB 15/1/15 31/1/15 5/2/2015 25/2/15 28/3/15 4/4/2015 ---- ######## 31/3/16 Plan Post 293 SW-5-I and Sewerage Review Gobindgarh Treatment Plant 4 Hasanpur PRWSSIP-Ldh-Div- Sewer scheme 260 NCB 15/1/15 31/1/15 5/2/2015 25/2/15 28/3/15 4/4/2015 ---- ######## 31/3/16 Plan Post 264 SW-6-I and Sewerage Review Treatment Plant 5 Kailpur PRWSSIP-Ldh-Div- Sewer scheme 195 NCB 15/1/15 31/1/15 5/2/2015 25/2/15 28/3/15 4/4/2015 ---- ######## 31/3/16 Plan Post 198 SW-7-I and Sewerage Review Treatment Plant Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 6 Mangli Nichi PRWSSIP-Ldh-Div- Sewer scheme 175 NCB 15/1/15 31/1/15 5/2/2015 25/2/15 28/3/15 4/4/2015 ---- ######## 31/3/16 and its SW-8-I and Sewerage Plan Post abadies Guru 182 Treatment Plant Review Ramdas nagar 7 Mundian PRWSSIP-Ldh-Div- Sewer scheme 290 NCB 15/1/15 31/1/15 5/2/2015 25/2/15 28/3/15 4/4/2015 ---- ######## 31/3/16 Khurd and its SW-9-I and Sewerage Plan other Treatment Plant Post 296 Review habitations( mundian tibba etc) 8 Phullanwal PRWSSIP-Ldh-Div- Sewer scheme 370 NCB 15/1/15 31/1/15 5/2/2015 25/2/15 28/3/15 4/4/2015 ---- ######## 31/3/16 Plan Post 377 SW-10-I and Sewerage Review Treatment Plant DIV 2 LUDHIANA 9 Sewer Scheme PRWSSIP-Ldh-Div- Sewer scheme 510 NCB 15/1/15 31/1/15 5/2/2015 25/2/15 28/3/15 4/4/2015 ---- ######## 31/3/16 Plan Post Meharban 550 SW-11-I and Sewerage Review Treatment Plant 10 Sewer Scheme PRWSSIP-Ldh-Div- Sewer scheme 510 NCB 15/1/15 31/1/15 5/2/2015 25/2/15 28/3/15 4/4/2015 ---- ######## 31/3/16 Plan Post Bhattian Bet 550 SW-12-I and Sewerage Review Treatment Plant DIV 3 LUDHIANA 11 Dhottar PRWSSIP-Ldh-Div- Sewer scheme 60 NCB 15/1/15 31/1/15 5/2/2015 25/2/15 28/3/15 4/4/2015 ---- ######## 31/3/16 Plan Post 65 SW-13-I and Sewerage Review Treatment Plant DIV KHANNA 12 Jaspalon PRWSSIP-Ldh- Sewer scheme 225 NCB 15/1/15 31/1/15 5/2/2015 25/2/15 28/3/15 4/4/2015 ---- ######## 31/3/16 Plan and Sewerage Post 230 Khanna-Div-SW-14-I Review Treatment Plant Performance Imporvement Schemes DIV 1 LUDHIANA PRWSSIP-LDH-Div- 6 Plan Improvement of Post 1 Chakkar 6 IMP-18-I NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 exisiting Schemes Manakwal ( PRWSSIP-LDH-Div- 10 and its other IMP-19-I Plan Improvement of Post 2 habitations 10 NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 exisiting Schemes Preet Vihar etc) PRWSSIP-LDH-Div- 20 Plan Improvement of Post 3 Baddowal 20 IMP-20-I NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 exisiting Schemes PRWSSIP-LDH-Div- 10 Plan Improvement of Post 4 Braich 10 IMP-21-I NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 exisiting Schemes Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-LDH-Div- 16 Plan Improvement of Post 5 Bains 16 IMP-22-I NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 exisiting Schemes Kheri and its PRWSSIP-LDH-Div- 15 other IMP-23-I Plan habitations Improvement of Post 6 15 NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Basti exisiting Schemes Shamsher Ghat PRWSSIP-LDH-Div- 14 Plan Sahnewal- Improvement of Post 7 14 IMP-24-I NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Harijan Basti exisiting Schemes PRWSSIP-LDH-Div- Plan 20 Improvement of Post 8 Dadahur 20 IMP-25-I NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 exisiting Schemes DIV 2 Ludhiana Bonker PRWSSIP-LDH-Div- 4.5 Plan Improvement of Post 9 5 IMP-26-I NS 16/1/15 5/2/15 12/2/2015 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 Gujjran exisiting Schemes Review PRWSSIP-LDH-Div- 4.5 Plan Improvement of Post 10 Chuharwal 5 IMP-27-I NS 16/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes Hazuri Bagh PRWSSIP-LDH-Div- 9 Plan Improvement of Post 11 10 IMP-28-I NS 18/1/15 5/2/15 12/2/2015 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 Colony exisiting Schemes Review PRWSSIP-LDH-Div- 4.5 Plan Improvement of Post 12 Bhattian Bet 5 IMP-29-I NS 18/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- 12 Plan Improvement of Post 13 Bahaderke 13 IMP-30-I NCB 18/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- 14 Plan Improvement of Post 14 Sudhar 15 IMP-31-I NCB 18/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- 4.5 Plan Improvement of Post 15 Chuharpur 5 IMP-32-I NS 18/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes Machhian PRWSSIP-LDH-Div- 4.5 Plan Plan Plan Plan Improvement of Post 16 5 IMP-33-I NS 20/1/15 5/2/15 12/2/2015 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 Kalan exisiting Schemes Review PRWSSIP-LDH-Div- Improvement of 9.5 Post 17 Boparai Kalan 10 IMP-34-I NCB 20/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 4.5 Post 18 Logarh 5 IMP-35-I NS 20/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 9.5 Post 19 Mansuran 10 IMP-36-I NCB 20/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-LDH-Div- 4.5 Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Improvement of Post 20 Chupki 5 IMP-37-I NS 20/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 4.5 Post 21 Nangal Khurd 5 IMP-38-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 4.5 Post 22 Kalakh 5 IMP-39-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 4.5 Post 23 Dango 5 IMP-40-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 4.5 Post 24 Dolon Kalan 5 IMP-41-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 4.5 Post 25 Nangal Kalan 5 IMP-42-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 9.5 Post 26 Jassowal 10 IMP-43-I NCB 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes Mehma Singh PRWSSIP-LDH-Div- Improvement of 4.5 Post 27 5 IMP-44-I NS 25/1/15 5/2/15 12/2/2015 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 Wala exisiting Schemes Review PRWSSIP-LDH-Div- Improvement of 9.5 Post 28 Phallewal 10 IMP-45-I NCB 28/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 4.5 Post 29 Rachin 5 IMP-46-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 4.5 Post 30 Bhini Doaba 5 IMP-47-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 4.5 Post 31 Bhaini Shalu 5 IMP-48-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 4.5 Post 32 Bore 5 IMP-49-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 4.5 Post 33 Dhaula 5 IMP-50-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 4.5 Post 34 Dheri 5 IMP-51-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes Fatehgarh PRWSSIP-LDH-Div- Improvement of 4.5 Post 35 5 IMP-52-I NS 25/1/15 5/2/15 12/2/2015 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 Jattan exisiting Schemes Review PRWSSIP-LDH-Div- Improvement of 4.5 Post 36 Gonsgarh 5 IMP-53-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 4.5 Post 37 Gehelewal 5 IMP-54-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-LDH-Div- 4.5 Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Improvement of Post 38 Ghumana 5 IMP-55-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 7.5 Post 39 Hawas 8 IMP-56-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 4.5 Post 40 Herran 5 IMP-57-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 4.5 Post 41 Kalas Kalan 5 IMP-58-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 4.5 Post 42 Kariana Khurd 5 IMP-59-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 4.5 Post 43 Mangat 5 IMP-60-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 4.5 Post 44 Meonwal 5 IMP-61-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 4.5 Post 45 Rajol 5 IMP-62-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 4.5 Post 46 Sasrali Colony 5 IMP-63-I NS 25/1/15 5/2/15 12/2/2015 Review 28/2//15 30/3/15 14/4/15 --- 10/4/15 31/3/16 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 12 Post 47 Panjeta 12 IMP-64-I NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 exisiting Schemes PRWSSIP-LDH-Div- Improvement of 9 Post 48 Maldoud 9 IMP-65-I NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 exisiting Schemes DIV 3 LUDHIANA PRWSSIP-LDH-Div- 10 Plan Kannian Improvement of Post 54 10 IMP-66-I NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Hussaini exisiting Schemes PRWSSIP-LDH-Div- 10 Plan Improvement of Post 55 Malsian Bajan 10 IMP-67-I NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 exisiting Schemes PRWSSIP-LDH-Div- 20 Plan Improvement of Post 56 Purrain 20 IMP-68-I NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 exisiting Schemes PRWSSIP-LDH-Div- 15 Plan Improvement of Post 57 Raowal 15 IMP-69-I NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 exisiting Schemes PRWSSIP-LDH-Div- 10 Plan Improvement of Post 58 Rasulpur 10 IMP-70-I NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 exisiting Schemes PRWSSIP-LDH-Div- 15 Plan Improvement of Post 59 Sidhwan Bet 15 IMP-71-I NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 exisiting Schemes Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-LDH-Div- 10 Plan Improvement of Post 60 walipur 10 IMP-72-I NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 exisiting Schemes DIV KHANNA PRWSSIP-Khanna- 8 Plan Improvement of Post 61 Chuharpur 8 Div-IMP-73-I NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 exisiting Schemes PRWSSIP-Khanna- 10 Plan Improvement of Post 62 Harbanspura 10 Div-IMP-74-I NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 exisiting Schemes PRWSSIP-Khanna- 6 Plan Lakhowal Improvement of Post 63 6 Div-IMP-75-I NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Khurd exisiting Schemes PRWSSIP-Khanna- 10 Plan Macchiwara Improvement of Post 64 10 Div-IMP-76-I NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Khaan exisiting Schemes PRWSSIP-Khanna- 15 Plan Improvement of Post 65 Ottalan 15 Div-IMP-77-I NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 exisiting Schemes Water meters Installation DIV 1 LUDHIANA PRWSSIP-LDH-Div- Installation of 10 Plan Post 1 Sarihn WM-1-I Water Meters in NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 10 Existing Schemes PRWSSIP-LDH-Div- Installation of 6 Plan Post 2 Hans WM-2-I Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 6 Existing Schemes PRWSSIP-LDH-Div- Installation of 6 Plan Post 3 Shanewal Khurd WM-3-I Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 6 Existing Schemes PRWSSIP-LDH-Div- Installation of 4 Plan Post 4 Jhamat WM-4-I Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 4 Existing Schemes PRWSSIP-LDH-Div- Installation of 7 Plan Post 5 Chimna WM-5-I Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 7 Existing Schemes PRWSSIP-LDH-Div- Installation of 9 Plan WM-6-I Post 6 Kalsian Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 9 DIV 2 Ludhiana PRWSSIP-LDH-Div- Installation of 5 Plan WM-7-I Post 7 Dangora Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 5 Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-LDH-Div- Installation of 2 Plan WM-8-I Post 8 Bagga khurd Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 2 PRWSSIP-LDH-Div- Installation of 5 Plan WM-9-I Post 9 Bore Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 5 PRWSSIP-LDH-Div- Installation of 8 Plan WM-10-I Post 10 Mangli Tanda Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 8 PRWSSIP-LDH-Div- Installation of 2 11 Salempur Bet WM-11-I Plan Water Meters in NS 15/4/15 30/4/15 7/5/2015 Post 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Review Existing Schemes 2 PRWSSIP-LDH-Div- Installation of 10 Plan WM-12-I Post 12 Baloke Water Meters in NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 10 PRWSSIP-LDH-Div- Installation of 8 Plan WM-13-I Post 13 Meherban Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 8 PRWSSIP-LDH-Div- Installation of 4 Plan WM-14-I Post 14 Baranhara Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 4 PRWSSIP-LDH-Div- Installation of 10 Plan WM-15-I Post 15 Harkrishan vihar Water Meters in NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 10 PRWSSIP-LDH-Div- Installation of 5 Plan WM-16-I Post 16 Bonker Gujjran Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 5 PRWSSIP-LDH-Div- Installation of 5 Plan WM-17-I Post 17 Lakhowal Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 5 PRWSSIP-LDH-Div- Installation of 2 Plan WM-18-I Post 18 Kadian Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 2 PRWSSIP-LDH-Div- Installation of 7 Plan WM-19-I Post 19 Kakowal Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 7 PRWSSIP-LDH-Div- Installation of 5 Plan WM-20-I Post 20 Bhiamian Khurd Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 5 Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-LDH-Div- Installation of 3 Plan WM-21-I Post 21 Assi Khurd Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 3 PRWSSIP-LDH-Div- Installation of 10 Plan WM-22-I Post 22 Dhaipai Water Meters in NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 10 PRWSSIP-LDH-Div- Installation of 10 Plan WM-23-I Post 23 Narangwal Water Meters in NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 10 PRWSSIP-LDH-Div- Installation of 7 24 Beela WM-24-I Plan Water Meters in NS 15/4/15 30/4/15 7/5/2015 Post 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Review Existing Schemes 7 PRWSSIP-LDH-Div- Installation of 10 Plan WM-25-I Post 25 Sudhar Water Meters in NCB 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 10 PRWSSIP-LDH-Div- Installation of 2 Plan WM-26-I Post 26 BAGGA KALAN Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 2 DIV 3 LUDHIANA PRWSSIP-LDH-Div- Installation of 2 Plan WM-27-I Post 27 Ghunewal Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 2 PRWSSIP-LDH-Div- Installation of 1 Plan WM-28-I Post 28 Taraf Kotli Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 1 PRWSSIP-LDH-Div- Installation of 1 Plan WM-29-I Post 29 Tapper Herrian Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 1 PRWSSIP-LDH-Div- Installation of 5 Plan WM-30-I Post 30 Bodalwala Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 5 PRWSSIP-LDH-Div- Installation of 7 Plan WM-31-I Post 31 Bujrag Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 7 PRWSSIP-LDH-Div- Installation of 4 Plan WM-32-I Post 32 Khanjarwal Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 4 Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-LDH-Div- Installation of 4 Plan WM-33-I Post 33 Malsian Bhaike Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 4 DIV KHANNA PRWSSIP-Khanna- Installation of 4 Plan Div-WM-34-I Post 34 Gobindpura Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 4 PRWSSIP-Khanna- Installation of 3 Plan Div-WM-35-I Post 35 Mangewal Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 3 PRWSSIP-Khanna- Plan Installation of 5 Div-WM-36-I Post 36 Faizgarh Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 5 PRWSSIP-Khanna- Installation of 9 Plan Div-WM-37-I Post 37 Jaspalon Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 9 PRWSSIP-Khanna- Installation of 3 Plan Div-WM-38-I Post 38 Mullanpur Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 3 PRWSSIP-Khanna- Installation of 3 Plan Div-WM-39-I Post 39 Sahibpur Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 3 PRWSSIP-Khanna- Installation of 3 Plan Div-WM-40-I Post 40 Mahaun Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 3 PRWSSIP-Khanna- Installation of 1 Plan Div-WM-41-I Post 41 Bir Kishan Singh Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 1 PRWSSIP-Khanna- Installation of 5 Plan Div-WM-42-I Post 42 Majra Rahon Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 5 PRWSSIP-Khanna- Installation of 3 Plan Div-WM-43-I Post 43 Malakpur Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 3 PRWSSIP-Khanna- Installation of 6 Plan Div-WM-44-I Post 44 Khatra Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 6 Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-Khanna- Installation of 5 Plan Div-WM-45-I Post 45 Aluna Miana Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 5 PRWSSIP-Khanna- Installation of 7 Plan Div-WM-46-I Post 46 Mandiala Kalan Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 7 PRWSSIP-Khanna- Installation of 7 Plan Div-WM-47-I Post 47 Aluna Palla Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 7 PRWSSIP-Khanna- Installation of 4 48 Raipur Rajputtan Div-WM-48-I Plan Water Meters in NS 15/4/15 30/4/15 7/5/2015 Post 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Review Existing Schemes 4 PRWSSIP-Khanna- Installation of 2 Plan Div-WM-49-I Post 49 Gazipur Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 2 PRWSSIP-Khanna- Installation of 2 Plan Div-WM-50-I Post 50 Rajgarh Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 2 PRWSSIP-Khanna- Installation of 2 Plan Div-WM-51-I Post 51 Mithewal Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 2 PRWSSIP-Khanna- Installation of 5 Plan Div-WM-52-I Post 52 Rohlon Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 5 PRWSSIP-Khanna- Installation of 3 Plan Div-WM-53-I Post 53 Jatiwal Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 3 PRWSSIP-Khanna- Installation of 2 Plan Div-WM-54-I Post 54 Akalgarh Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 2 PRWSSIP-Khanna- Installation of 4 Plan Div-WM-55-I Post 55 Khirnian Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 4 PRWSSIP-Khanna- Installation of 2 Plan Div-WM-56-I Post 56 Chakli Adal Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 2 PRWSSIP-Khanna- Installation of 2 Plan Div-WM-57-I Post 57 Loharian Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 2 Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-Khanna- Installation of 1 Plan Div-WM-58-I Post 58 Shamspur Bet Water Meters in NS 15/4/15 30/4/15 7/5/2015 Review 15/5/15 30/5/15 15/6/15 --- 25/6/15 25/10/15 Existing Schemes 1 North Zone DISTT.JALANDHAR DIVISION NO. 1, Jalandhar 1 Dalewal 70.00 PRWSSIP-Jld-Div- Tubewell,Civil 70.00 NCB 06-02-2015 16-02-2015 16-03-2015 POST- 30-03-2015 29-04-2015 14-05-2015 POST- 24-05- -- -- -- 23-03-2016 -- -- Plan 149-I Distribution, OHSR, REVIEW REVIEW 2015 Block Rurka Kalan Distrct Jalandhar 2 Taggar 60.00 PRWSSIP-Jld-Div- Tubewell,Civil 60.00 NCB 09-02-2015 19-02-2015 19-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- Plan 150-I Distribution, OHSR, REVIEW REVIEW 2015 Block Rurka Kalan Distrct Jalandhar 3 Bachhowal 55.00 PRWSSIP-Jld-Div- Tubewell,Civil 55.00 NCB 10-02-2015 17-02-2015 17-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- Plan 151-I Distribution, REVIEW REVIEW 2015 OHSRBlock Phillaur Distrct Jalandhar 4 Jagral 60.50 PRWSSIP-Jld-Div- Tubewell,Civil 60.50 NCB 05-02-2015 12-02-2015 16-03-2015 POST- 31-03-2015 30-04-2015 15-05-2015 POST- 25-05- -- -- -- 24-03-2016 -- -- Plan 152-I Distribution, OHSR, REVIEW REVIEW 2015 Block Jal. East Distrct Jalandhar 5 Sansarpur 80.00 PRWSSIP-Jld-Div- Tubewell,Civil 80.00 NCB 06-02-2015 16-02-2015 16-03-2015 POST- 30-03-2015 29-04-2015 14-05-2015 POST- 24-05- -- -- -- 23-03-2016 -- -- Plan 153-I Distribution, OHSR, REVIEW REVIEW 2015 Block Jal. East Distrct Jalandhar 6 Sunner Khurd 60.00 PRWSSIP-Jld-Div- Tubewell,Civil 60.00 NCB 09-02-2015 19-02-2015 19-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- Plan 154-I Distribution, OHSR, REVIEW REVIEW 2015 Block Rurka Kalan Distrct Jalandhar Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 7 Chitti 70.00 PRWSSIP-Jld-Div- Tubewell,Civil 70.00 NCB 10-02-2015 17-02-2015 17-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- Plan 155-I Distribution, OHSR, REVIEW REVIEW 2015 Block Jal. East Distrct Jalandhar 8 Patara 95.00 PRWSSIP-Jld-Div- Tubewell, Civil 80.00 NCB 09-02-2015 19-02-2015 19-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- Plan 156-I Distribution, Block REVIEW REVIEW 2015 Jal.East Distrct Jalandhar Patara PRWSSIP-Jld-Div- Plan OHSR, Block 15.00 NCB 10-02-2015 17-02-2015 17-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- 156-II Jal.East Distrct REVIEW REVIEW 2015 Jalandhar 9 Dhina 112.00 PRWSSIP-Jld-Div- Tubewell,Civil 90.00 NCB 10-02-2015 17-02-2015 17-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- Plan 157-I Distribution, Block REVIEW REVIEW 2015 Jal. East Distrct Jalandhar Dhina PRWSSIP-Jld-Div- OHSR, Block Jal.East 22.00 NCB 10-02-2015 17-02-2015 17-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- Plan 157-II Distrct Jalandhar REVIEW REVIEW 2015 10 Ganna Pind 120.00 PRWSSIP-Jld-Div- Tubewell,Civil 98.00 NCB 06-02-2015 16-02-2015 16-03-2015 POST- 30-03-2015 29-04-2015 14-05-2015 POST- 24-05- -- -- -- 23-03-2016 -- -- Plan 158-I Distribution, Block REVIEW REVIEW 2015 Phillaur Distrct Jalandhar Ganna Pind PRWSSIP-Jld-Div- OHSR, Block Phillaur 22.00 NCB 05-02-2015 12-02-2015 16-03-2015 POST- 31-03-2015 30-04-2015 15-05-2015 POST- 25-05- -- -- -- 24-03-2016 -- -- Plan 158-II Distrct Jalandhar REVIEW REVIEW 2015 Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 11 Chuheki 60.00 PRWSSIP-Jld-Div- Tubewell, OHSR, 60.00 NCB 06-02-2015 16-02-2015 16-03-2015 POST- 30-03-2015 29-04-2015 14-05-2015 POST- 24-05- -- -- -- 23-03-2016 -- -- Plan 159-I Civil Distribution, REVIEW REVIEW 2015 Block Nurmahal Distrct Jalandhar 12 Mubarakpur 70.00 PRWSSIP-Jld-Div- Tubewell,Civil 70.00 NCB 05-02-2015 12-02-2015 16-03-2015 POST- 31-03-2015 30-04-2015 15-05-2015 POST- 25-05- -- -- -- 24-03-2016 -- -- Plan 160-I Distribution, OHSR, REVIEW REVIEW 2015 Block Jal. East Distrct Jalandhar DIVISION NO. 2, Jalandhar 1 Nihaluwal 55.00 PRWSSIP-Jld-Div- Tubewell, OHSR, 45.00 NCB 09-02-2015 19-02-2015 19-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- Plan 161-I Civil Distribution, REVIEW REVIEW 2015 Block Lohian Distrct Jalandhar 2 Malsian 278.64 PRWSSIP-Jld-Div- Tubewell, OHSR, 123.64 NCB 10-02-2015 17-02-2015 17-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 -- 28-05- -- -- -- 27-03-2016 -- -- Plan 162-I Civil Distribution, REVIEW 2015 Block Shahkot Distrct Jalandhar PRWSSIP-Jld-Div- OHSR, Block 30.00 NCB 10-02-2015 17-02-2015 17-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 -- 28-05- -- -- -- 27-03-2016 -- -- Plan 162-II Shahkot Distrct REVIEW 2015 Jalandhar PRWSSIP-Jld-Div- Pipeline, Civil 125.00 NCB 10-02-2015 17-02-2015 17-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 -- 28-05- -- -- -- 27-03-2016 -- -- Plan 162-III Distribution, Block REVIEW 2015 Shahkot Distrct Jalandhar 3 Helar 52.00 PRWSSIP-Jld-Div- Tubewell, Civil 52.00 NCB 05-02-2015 12-02-2015 16-03-2015 POST- 31-03-2015 30-04-2015 15-05-2015 POST- 25-05- -- -- -- 24-03-2016 -- -- Plan 163-I Distribution, OHSR, REVIEW REVIEW 2015 Block Jal.West Distrct Jalandhar 4 Dhogri 80.00 PRWSSIP-Jld-Div- Tubewell, Civil 80.00 NCB 06-02-2015 16-02-2015 16-03-2015 POST- 30-03-2015 29-04-2015 14-05-2015 POST- 24-05- -- -- -- 23-03-2016 -- -- Plan 164-I Distribution, OHSR, REVIEW REVIEW 2015 Block Adampur Distrct Jalandhar Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 5 Lesriwal 62.00 PRWSSIP-Jld-Div- Tubewell,Civil 62.00 NCB 05-02-2015 12-02-2015 16-03-2015 POST- 31-03-2015 30-04-2015 15-05-2015 POST- 25-05- -- -- -- 24-03-2016 -- -- Plan 165-I Distribution, OHSR, REVIEW REVIEW 2015 Block Adampur Distrct Jalandhar 6 Kala Bakra 65.00 PRWSSIP-Jld-Div- Tubewell,Civil 65.00 NCB 06-02-2015 16-02-2015 16-03-2015 POST- 30-03-2015 29-04-2015 14-05-2015 POST- 24-05- -- -- -- 23-03-2016 -- -- Plan 166-I Distribution, OHSR, REVIEW REVIEW 2015 Block Bhogpur Distrct Jalandhar 7 Khojkipur 49.50 PRWSSIP-Jld-Div- Tubewell, OHSR, 49.50 NCB 09-02-2015 19-02-2015 19-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- 167-I Plan Civil Distribution, REVIEW REVIEW 2015 Block Bhogpur Distrct Jalandhar 8 Gehlar 54.80 PRWSSIP-Jld-Div- Tubewell, OHSR, 54.80 NCB 10-02-2015 17-02-2015 17-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- Plan 168-I Civil Distribution, REVIEW REVIEW 2015 Block Bhogpur Distrct Jalandhar 9 Saffipur 48.50 PRWSSIP-Jld-Div- Tubewell, OHSR, 48.50 NCB 05-02-2015 12-02-2015 16-03-2015 POST- 31-03-2015 30-04-2015 15-05-2015 POST- 25-05- -- -- -- 24-03-2016 -- -- Plan 169-I Civil Distribution, REVIEW REVIEW 2015 Block AdampurDistrct Jalandhar 10 Boparai 70.00 PRWSSIP-Jld-Div- Tubewell, Civil 70.00 NCB 10-02-2015 17-02-2015 17-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- Plan 170-I Distribution, OHSR, REVIEW REVIEW 2015 Block Nakadar Distrct Jalandhar 11 Mudha 55.00 PRWSSIP-Jld-Div- Tubewell, Civil 55.00 NCB 09-02-2015 19-02-2015 19-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- Plan 171-I Distribution, OHSR, REVIEW REVIEW 2015 Block Nakodar Distrct Jalandhar 12 Sihariawal 51.00 PRWSSIP-Jld-Div- Tubewell,Civil 51.00 NCB 05-02-2015 12-02-2015 16-03-2015 POST- 31-03-2015 30-04-2015 15-05-2015 POST- 25-05- -- -- -- 24-03-2016 -- -- Plan 172-I Distribution, OHSR, REVIEW REVIEW 2015 Block Shahkot Distrct Jalandhar Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 13 Bhudanwal 55.38 PRWSSIP-Jld-Div- Tubewell,Civil 55.38 NCB 06-02-2015 16-02-2015 16-03-2015 POST- 30-03-2015 29-04-2015 14-05-2015 POST- 24-05- -- -- -- 23-03-2016 -- -- Plan 173-I Distribution, OHSR, REVIEW REVIEW 2015 Block Shahkot Distrct Jalandhar 14 Bajwa Kalan 62.00 PRWSSIP-Jld-Div- Tubewell,Civil 62.00 NCB 05-02-2015 12-02-2015 16-03-2015 POST- 31-03-2015 30-04-2015 15-05-2015 POST- 25-05- -- -- -- 24-03-2016 -- -- Plan 174-I Distribution, OHSR, REVIEW REVIEW 2015 Block Shahkot Distrct Jalandhar 15 Kotla Heran 52.00 PRWSSIP-Jld-Div- Tubewell,Civil 52.00 NCB 09-02-2015 19-02-2015 19-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- 175-I Plan Distribution, OHSR, REVIEW REVIEW 2015 Block Nakodar Distrct Jalandhar Improvement Jalandhar 1 Sangal Sohal 21.00 PRWSSIP-JLD-Div- New Tubewell, 21.00 NCB 15.01.15 31.01.15 16.02.15 Post- 20.02.15 20.03.15 05.04.15 Post- 20.04.15 - - - 19.07.15 -- - IMP-77-I Machinery, Review Review Pipeline, Plan Chorinator, Rising Main, Block Jal.West Distrct 2 Lallian Kalan 18.50 PRWSSIP-JLD-Div- New Tubewell, 18.50 NCB 15.01.15 31.01.15 16.02.15 Post- 20.02.15 20.03.15 05.04.15 Post- 20.04.15 - - - 19.07.15 -- - IMP-78-I Machinery, Review Review Pipeline, Plan Chorinator, Rising Main, Block Jal.West Distrct 3 Ghurial 16.00 PRWSSIP-JLD-Div- New Tubewell, 16.00 NCB 01.02.2015 01.04.2015 16.04.2015 Post- 25.04.2015 25.05.2015 10.06.2015 Post- - - - 16.09.2016 -- - IMP-79-I Machinery, Review Review 17.06.201 Pipeline, 5 Plan Chorinator, Block Adampur Distrct Jalandhar 4 Padhiana 16.50 PRWSSIP-JLD-Div- New Tubewell, 16.50 NCB 15.01.15 31.01.15 16.02.15 Post- 20.02.15 20.03.15 05.04.15 Post- 20.04.15 - - - 19.07.15 -- - IMP-80-I Machinery, Review Review Pipeline, Plan Chorinator, Block Adampur Distrct Jalandhar Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 5 Littran 4.50 PRWSSIP-JLD-Div- New Machinery, 4.50 NS 15.01.15 31.01.15 16.02.15 Post- 20.02.15 20.03.15 05.04.15 Post- 20.04.15 - - - 19.07.15 -- - IMP-81-I Pipeline, Review Review Chorinator, Block Plan Nakodar Distrct Jalandhar 6 Khurla pur 3.80 PRWSSIP-Jld-Div- Pipeline, Block 3.80 NS 01.02.2015 01.04.2015 16.04.2015 Post- 25.04.2015 25.05.2015 10.06.2015 Post- - - - 16.09.2016 -- - IMP-82-I Nakodar Distrct Review Review 17.06.201 Jalandhar 5 Plan 7 Nawanpind 7.10 PRWSSIP-JLD-Div- Machinery, 7.10 NS 15.01.15 31.01.15 16.02.15 Post- 20.02.15 20.03.15 05.04.15 Post- 20.04.15 - - - 19.07.15 -- - Donewal IMP-83-I Pipeline, Review Review Chorinator, Block Plan Lohian Distrct Jalandhar 8 Sindhar 12.00 PRWSSIP-JLD-Div- Pipeline, Block 12.00 NCB 01.02.2015 01.04.2015 16.04.2015 Post- 25.04.2015 25.05.2015 10.06.2015 Post- - - - 16.09.2015 -- - IMP-84-I Lohian Distrct Review Review 17.06.201 Jalandhar 5 Plan 9 Dhadha 25.00 PRWSSIP-JLD-Div- New Tubewell, 25.00 NCB 15.01.15 31.01.15 16.02.15 Post- 20.02.15 20.03.15 05.04.15 Post- 20.04.15 - - - 19.07.15 -- - Hundal IMP-85-I Pipeline, Block Review Review Shahkot Distrct Plan Jalandhar 10 Virk 18.00 PRWSSIP-JLD-Div- New Tubewell, 18.00 NCB 01.02.2015 01.04.2015 16.04.2015 Post- 25.04.2015 25.05.2015 10.06.2015 Post- - - - 16.09.2015 -- - IMP-86-I Machinery, Review Review 17.06.201 Pipeline, 5 Plan Chorinator ,Rising Main, Block Phillaur Distrct 11 Diwali 15.00 PRWSSIP-JLD-Div- New Tubewell, 15.00 NCB 15.01.15 31.01.15 16.02.15 Post- 20.02.15 20.03.15 05.04.15 Post- 20.04.15 - - - 19.07.15 -- - IMP-87-I Machinery, Review Review Pipeline, Plan Chorinator, Rising Main, Block Jal. East Distrct Sewerage Jalandhar Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 1 Chak Chela 380.00 PRWSSIP-JLD-Div- 380.00 NCB 15.02.15 28.02.15 30.03.15 -- 20.04.15 20.05.15 15.06.15 -- 07.07.15 - - - 06.07.16 - - SW-15-I Sewerage Plan Treatment Plant, Block Lohian, Distrct Jalandhar DISTT.KAPURTHALA 1 Khaira 47.00 PRWSSIP-kpt-Div- Tubewell, Civil 47.00 NCB 06-02-2015 16-02-2015 16-03-2015 POST- 30-03-2015 29-04-2015 14-05-2015 POST- 24-05- -- -- -- 23-03-2016 -- -- Plan 176-I Work Distribution REVIEW REVIEW 2015 & OHSR, Block Phagwara, 2 Narangpur 30.00 PRWSSIP-kpt-Div- Plan Tubewell, Civil 30.00 NCB 09-02-2015 19-02-2015 19-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- 177-I Work Distribution & REVIEW REVIEW 2015 OHSR, Block Phagwara, 3 Barna 69.03 PRWSSIP-kpt-Div- Tubewell, Civil 69.03 NCB 10-02-2015 17-02-2015 17-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- Plan 178-I Work Distribution REVIEW REVIEW 2015 & OHSR, Block Phagwara, 4 Nasirabad 89.64 PRWSSIP-kpt-Div- Tubewell, Civil 89.64 NCB 05-02-2015 12-02-2015 16-03-2015 POST- 31-03-2015 30-04-2015 15-05-2015 POST- 25-05- -- -- -- 24-03-2016 -- -- Plan 179-I Work Distribution REVIEW REVIEW 2015 & OHSR, Block Phagwara, 5 Pandori 45.00 PRWSSIP-kpt-Div- Tubewell, Civil 45.00 NCB 06-02-2015 16-02-2015 16-03-2015 POST- 30-03-2015 29-04-2015 14-05-2015 POST- 24-05- -- -- -- 23-03-2016 -- -- Plan Rajputtan 180-I Work Distribution REVIEW REVIEW 2015 Block Nadala, 6 Manna 106.08 PRWSSIP-kpt-Div- Tubewell, Civil 106.08 NCB 09-02-2015 19-02-2015 19-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- Plan Talwandi 181-I Work Distribution REVIEW REVIEW 2015 & OHSR, Block Nadala, 7 Balo Chak 52.00 PRWSSIP-kpt-Div- Tubewell, Civil 52.00 NCB 10-02-2015 17-02-2015 17-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- Plan 182-I Work Distribution REVIEW REVIEW 2015 & OHSR, Block Nadala, 8 Innowal 20.22 PRWSSIP-kpt-Div- Tubewell, Civil 20.22 NCB 05-02-2015 12-02-2015 16-03-2015 POST- 31-03-2015 30-04-2015 15-05-2015 POST- 25-05- -- -- -- 24-03-2016 -- -- Plan 183-I Work Distribution REVIEW REVIEW 2015 & OHSR,Block Nadala, Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 9 Wadala Kalan 91.33 PRWSSIP-kpt-Div- Tubewell, Civil 91.33 NCB 09-02-2015 19-02-2015 19-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- Plan 184-I Work Distribution REVIEW REVIEW 2015 & OHSR, Block Kapurthala, 10 Nawanpind 60.00 PRWSSIP-kpt-Div- Tubewell, Civil 60.00 NCB 10-02-2015 17-02-2015 17-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- Plan Bhathe 185-I Work Distribution REVIEW REVIEW 2015 (Kapurthala & OHSR, Block Kapurthala, Rural) 11 Alaudipur 15.00 PRWSSIP-kpt-Div- Tubewell, Civil 15.00 NCB 05-02-2015 12-02-2015 16-03-2015 POST- 31-03-2015 30-04-2015 15-05-2015 POST- 25-05- -- -- -- 24-03-2016 -- -- Plan 186-I Work Distribution REVIEW REVIEW 2015 Block Kapurthala, 12 Sarai Jattan 54.41 PRWSSIP-kpt-Div- Tubewell, Civil 54.41 NCB 06-02-2015 16-02-2015 16-03-2015 POST- 30-03-2015 29-04-2015 14-05-2015 POST- 24-05- -- -- -- 23-03-2016 -- -- Plan 187-I Distribution & REVIEW REVIEW 2015 OHSR,Block Sultanpur Lodhi, 13 Shahwala 58.44 PRWSSIP-kpt-Div- Tubewell, Civil 58.44 NCB 09-02-2015 19-02-2015 19-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- Plan Indressa 188-I Work Distribution REVIEW REVIEW 2015 & OHSR, Block Sultanpur Lodhi, 14 Desal 96.66 PRWSSIP-kpt-Div- Tubewell, Civil 96.66 NCB 10-02-2015 17-02-2015 17-03-2015 POST- 02-04-2015 01-05-2015 18-05-2015 POST- 28-05- -- -- -- 27-03-2016 -- -- Plan 189-I Work Distribution REVIEW REVIEW 2015 & OHSR, Block Dhilwan, 15 Jahangirpur 64.00 PRWSSIP-kpt-Div- Tubewell, Civil 64.00 NCB 05-02-2015 12-02-2015 16-03-2015 POST- 31-03-2015 30-04-2015 15-05-2015 POST- 25-05- -- -- -- 24-03-2016 -- -- Plan 190-I Work Distribution REVIEW REVIEW 2015 & OHSR,Block Kapurthala, Improvement Kaputhala 1 Domeli 20.00 PRWSSIP-KPT-Div- OHSR, Block 20.00 NCB 28-02-2015 31-03-2015 20-04-2015 01-05-2015 08-06-2015 15-06-2015 -- 31-06-2015 -- -- -- -- 30-09-2015 -- Plan IMP-88-I Phagwara, District Post Kapurthala Review 2 Bajaj 18.00 PRWSSIP-KPT-Div- OHSR, Block 18.00 NCB 25-02-2015 31-03-2015 20-04-2015 01-05-2015 08-06-2015 18-06-2015 -- 26-06-2015 -- -- -- -- 25-09-2015 -- Plan IMP-89-I Nadala, District Post Kapurthala Review 3 Surkha 15.00 PRWSSIP-KPT-Div- OHSR, Block 15.00 NCB 15-01-2015 28-02-2015 16-03-2015 01-04-2015 08-05-2015 22-15-2015 -- 31-05-2015 -- -- -- -- 30-08-2015 -- Plan IMP-90-I Nadala, District Post Kapurthala Review Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 4 Fiali 18.00 PRWSSIP-KPT-Div- OHSR, Block 18.00 NCB 28-02-2015 31-03-2015 20-04-2015 01-05-2015 08-06-2015 15-06-2015 -- 31-06-2015 -- -- -- -- 30-09-2015 -- Plan IMP-91-I Kapurthala, Post District Review Kapurthala 5 25.00 Danwind Phullewal PRWSSIP-KPT-Div- OHSR, Block 25.00 NCB 25-02-2015 31-03-2015 20-04-2015 01-05-2015 08-06-2015 18-06-2015 -- 26-06-2015 -- -- -- -- 25-09-2015 -- Plan IMP-92-I Kapurthala, Post District Review Kapurthala 6 Chuharpur 18.00 PRWSSIP-KPT-Div- OHSR, Block 18.00 NCB 28-02-2015 31-03-2015 20-04-2015 01-05-2015 08-06-2015 15-06-2015 -- 31-06-2015 -- -- -- -- 30-09-2015 -- IMP-93-I Plan Sultanpur Lodhi, Post District Review Kapurthala 7 Latianwala 25.00 PRWSSIP-KPT-Div- OHSR, Block 25.00 NCB 15-01-2015 28-02-2015 16-03-2015 01-04-2015 08-05-2015 22-15-2015 -- 31-05-2015 -- -- -- -- 30-08-2015 -- Plan IMP-94-I Sultanpur Lodhi, Post District Review Kapurthala Sewerage Kaputhala 1 Dyalpur 442.80 PRWSSIP-JLD-Div- Sewaerage 442.80 NCB 28-02-2015 31-03-2015 30-04-2015 15-05-2015 23-06-2015 15-07-2015 -- 31-07-2015 -- -- 30-07-2016 -- -- -- Plan SW-16-I Treatment Plant , Block Dhilwan, Post District Review Kapurthala District Gurdaspur Water Supply Schemes WSS, Division Gurdaspur 1 Dostpur 70.00 PRWSSIP-GSP-Div- 70.00 NCB 25.01.15 26.2.15 03.03.15 06.03.15 10.04.15 30.04.15 - 31.05.15 - - - 29.02.16 - 0.00 Independent Water 191-I Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR 2 Nangal 48.00 PRWSSIP-GSP-Div- Independent Water 48.00 NCB 25.01.15 26.2.15 03.03.15 06.03.15 10.04.15 30.04.15 - 31.05.15 - - - 29.02.16 - 0.00 Baghana 192-I Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 3 Babri 68.00 PRWSSIP-GSP-Div- Independent Water 68.00 NCB 20.01.15 21.02.15 03.03.15 06.03.15 10.04.15 30.04.15 - 31.05.15 - - - 29.02.16 - 0.00 193-I Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR 4 Hardo 98.00 PRWSSIP-GSP-Div- Independent Water 98.00 NCB 20.01.15 20.02.15 02.03.15 06.03.15 10.04.15 05.05.15 - 05.06.15 - - - 04.03.16 - 0.00 Bathwala 194-I Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR 5 Bala Pindi 42.00 PRWSSIP-GSP-Div- 42.00 NCB 25.01.15 25.02.15 10.03.15 14.03.15 16.04.15 12.05.15 - 12.06.15 - - - 04.03.16 - 0.00 Independent Water 195-I Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR 6 Ugara 39.00 PRWSSIP-GSP-Div- Independent Water 39.00 NCB 25.01.15 25.02.15 10.03.15 14.03.15 16.04.15 12.05.15 - 12.06.15 - - - 04.03.16 - 0.00 196-I Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR etc. 7 Nushra Majja 98.00 PRWSSIP-GSP-Div- 98.00 NCB 30.01.15 30.02.15 12.03.15 13.03.15 17.04.15 09.05.15 - 11.06.15 - - - 31.03.16 - 0.00 Independent Water Singh 197-I Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR WSS, Division Batala 1 Pabharali 42.00 PRWSSIP-GSP- Independent Water 42.00 NCB 20.01.15 21.02.15 02.03.15 05.03.15 09.04.15 30.04.15 - 05.06.15 - - - 05.03.16 - 0.00 Batala-Div-198-I Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR 2 Bassrawan 43.00 PRWSSIP-GSP- Independent Water 43.00 NCB 25.01.15 25.02.15 10.03.15 14.03.15 16.04.15 12.05.15 - 12.06.15 - - - 04.03.16 - 0.00 Batala-Div-199-I Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR 3 Rasulpur 45.00 PRWSSIP-GSP- Independent Water 45.00 NCB 20.01.15 21.02.15 02.03.15 05.03.15 09.04.15 30.04.15 - 05.06.15 - - - 05.03.16 - 0.00 Batala-Div-200-I Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR 4 Kalian 35.00 PRWSSIP-GSP- Independent Water 35.00 NCB 20.01.15 20.02.15 02.03.15 03.03.15 07.04.15 29.04.15 - 01.06.15 - - - 31.03.16 - 0.00 Batala-Div-201-I Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 5 Sekhupura 42.00 PRWSSIP-GSP- Independent Water 42.00 NCB 25.01.15 25.02.15 10.03.15 14.03.15 16.04.15 12.05.15 - 12.06.15 - - - 04.03.16 - 0.00 Batala-Div-202-I Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR 6 Mamrai 30.00 PRWSSIP-GSP- Independent Water 30.00 NCB 25.01.15 25.02.15 10.03.15 14.03.15 16.04.15 12.05.15 - 12.06.15 - - - 04.03.16 - 0.00 Batala-Div-203-I Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR 7 Harchowal 52.00 PRWSSIP-GSP- Independent Water 52.00 NCB 30.01.15 30.02.15 12.03.15 13.03.15 17.04.15 09.05.15 - 11.06.15 - - - 31.03.16 - 0.00 Batala-Div-204-I Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR 8 Sidhwan 30.00 PRWSSIP-GSP- Independent Water 30.00 NCB 30.01.15 30.02.15 12.03.15 13.03.15 17.04.15 09.05.15 - 11.06.15 - - - 31.03.16 - 0.00 Batala-Div-205-I Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR District :- Pathankot WSS, Division Pathankot 1 Aner 48.00 PRWSSIP-GSP-PTK- Independent Water 48.00 NCB 20.01.15 20.02.15 02.03.15 03.03.15 07.04.15 29.04.15 - 01.06.15 - - - 31.03.16 - 0.00 Div-206-I Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR 2 Dhaki Saidan 45.00 PRWSSIP-GSP-PTK- Independent Water 45.00 NCB 20.01.15 20.02.15 02.03.15 03.03.15 07.04.15 29.04.15 - 01.06.15 - - - 31.03.16 - 0.00 Div-207-I Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR 3 Lahri 44.00 PRWSSIP-GSP-PTK- 44.00 NCB 25.01.15 25.02.15 10.03.15 14.03.15 16.04.15 12.05.15 - 12.06.15 - - - 04.03.16 - 0.00 Independent Water Div-208-I Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR 4 Danour 45.00 PRWSSIP-GSP-PTK- 45.00 NCB 20.01.15 20.02.15 02.03.15 03.03.15 07.04.15 29.04.15 - 01.06.15 - - - 31.03.16 - 0.00 Independent Water Div-209-I Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR 5 Chack Madho 45.00 PRWSSIP-GSP-PTK- 45.00 NCB 25.01.15 25.02.15 10.03.15 14.03.15 16.04.15 12.05.15 - 12.06.15 - - - 04.03.16 - 0.00 Singh Div-210-I Independent Water Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 6 Itty 47.00 PRWSSIP-GSP-PTK- 47.00 NCB 25.01.15 25.02.15 10.03.15 14.03.15 16.04.15 12.05.15 - 12.06.15 - - - 04.03.16 - 0.00 Div-211-I Independent Water Supply Scheme by Post Plan installing Review T/Well,P.C,OHSR Performance Imporvement Schemes WSS, Division Gurdaspur 1 Lalowal 5.00 PRWSSIP-GSP-Div- Coverage of left out 5.00 NS 25.01.15 25.02.15 05.03.15 10.03.15 31.03.15 15.04.15 - 05.05.15 - - - 05.08.15 0.00 IMP-95-I streets,Leakages of Post Plan Pipe Review Lines,Development of Water Works etc. 2 Bhani Paswan 5.00 PRWSSIP-GSP-Div- Coverage of left out 5.00 NS 25.01.15 25.02.15 05.03.15 10.03.15 31.03.15 15.04.15 - 05.05.15 - - - 05.08.15 0.00 IMP-96-I streets,Leakages of Post Plan Pipe Review Lines,Development of Water Works etc. 3 Gazikot 5.00 PRWSSIP-GSP-Div- Coverage of left out 5.00 NS 30.01.15 06.03.15 16.03.15 23.03.15 13.04.15 30.04.15 - 20.05.15 - - - 20.08.15 0.00 IMP-97-I streets,Leakages of Post Plan Pipe Review Lines,Development of Water Works etc. WSS, Division Batala 1 Manoharpur 5.00 PRWSSIP-Batala-Div- Coverage of left out 5.00 NS 25.01.15 25.02.15 05.03.15 10.03.15 31.03.15 15.04.15 - 05.05.15 - - - 05.08.15 0.00 IMP-98-I streets,Leakages of Pipe Post Plan Lines,Development Review of Water Works etc. 2 Dholpur 5.00 PRWSSIP-Batala-Div- Coverage of left out 5.00 NS 25.01.15 25.02.15 05.03.15 10.03.15 31.03.15 15.04.15 - 05.05.15 - - - 05.08.15 0.00 IMP-99-I streets,Leakages of Pipe Post Plan Lines,Development Review of Water Works etc. 3 Dadu Yod 5.00 PRWSSIP-Batala-Div- Coverage of left out 5.00 NS 30.01.15 06.03.15 16.03.15 23.03.15 13.04.15 30.04.15 - 20.05.15 - - - 20.08.15 0.00 IMP-100-I streets,Leakages of Pipe Post Plan Lines,Development Review of Water Works etc. Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 4 Ranger Nangal 5.00 PRWSSIP-Batala-Div- Coverage of left out 5.00 NS 30.01.15 06.03.15 16.03.15 23.03.15 13.04.15 30.04.15 - 20.05.15 - - - 20.08.15 0.00 IMP-101-I streets,Leakages of Pipe Post Plan Lines,Development Review of Water Works etc. District :Pathankot WSS, Division Pathankot 1 Beli Changa of 5.00 PRWSSIP-PTK-Div- Coverage of left out 5.00 NS 25.01.15 28.02.15 15.03.15 20.03.15 10.04.15 25.04.15 - 25.05.15 - - - 25.08.15 0.00 Abadi Bhoor IMP-102-I streets,Leakages of Pipe Post Plan Lines,Development Review of Water Works etc. 2 Gol Datial 5.00 PRWSSIP-PTK-Div- Coverage of left out 5.00 NS 25.01.15 28.02.15 15.03.15 20.03.15 10.04.15 25.04.15 - 25.05.15 - - - 25.08.15 0.00 IMP-103-I streets,Leakages of Pipe Lines,Development Post Plan Review of Water Works etc. 3 Madhopur 5.00 PRWSSIP-PTK-Div- Coverage of left out 5.00 NS 30.01.15 06.03.15 20.03.15 23.03.15 13.04.15 30.04.15 - 20.05.15 - - - 20.08.15 0.00 Kulian IMP-104-I streets,Leakages of Pipe Post Plan Lines,Development Review of Water Works etc. Sewerage Schemes WSS, Division Gurdaspur 1 Fero Chachi 145.00 PRWSSIP-GSP-Div- Sewerage Schemes 145.00 NCB 15.02.2015 10.04.2015 27.04.2015 05.05.2015 15.06.2015 15.07.2015 - 17.08.201 - - - 17.05.2016 0.00 SW-17-I Post 5 Plan Review 2 Ale Chack 140.00 PRWSSIP-GSP-Div- Sewerage Schemes 140.00 NCB 15.02.2015 10.04.2015 27.04.2015 05.05.2015 15.06.2015 15.07.2015 - 17.08.201 - - - 17.05.2016 0.00 SW-18-I Post 5 Plan Review WSS, Division Batala 1 Gillanwali 140.00 PRWSSIP-Batala-Div- Sewerage Schemes 140.00 NCB 30.01.15 25.03.15 15.04.15 20.04.15 30.05.15 30.06.15 - 31.07.15 - - - 30.04.16 0.00 Post Plan SW-19-I Review Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 2 PRWSSIP-Batala-Div- Sewerage Schemes 170.00 15.02.2015 10.04.2015 27.04.2015 05.05.2015 15.06.2015 15.07.2015 - 17.08.201 - - - 17.05.2016 0.00 Post Plan Ghani Ke SW-20-I Review 5 Banger 170.00 District :Pathankot WSS, Division Pathankot 1 Gura Kalan 145.00 PRWSSIP-PTK-Div- Sewerage Schemes 145.00 NCB 30.01.15 25.03.15 15.04.15 Post 20.04.15 30.05.15 30.06.15 - 31.07.15 - - - 30.04.16 0.00 Plan SW-21-I Review Circle Hoshiarpur District Hoshiarpur Division Hoshiarpur-1 Water supply Scheme 1 Prov. Water 85.00 PRWSSIP-HSP-Div- Prov. Independent 85.00 NCB 01/02/2015 01/03/2015 10/03/2015 15/03/2015 20/04/2015 30/04/2015 - - - - - 31/01/2016 31/03/20 Plan supply Scheme 213-I W/S Scheme 16 Takhipur T/Well,OHSR & civil Post work(Fifurcation Review Mundian from existing W/S scheme Panwan Sewarage Scheme 2 Prov. 170.00 PRWSSIP-HSR-Div- Sewarage Scheme 170.00 NCB 01/04/2015 01/05/2016 15/05/2015 20/05/2016 25/06/2015 10/07/2015 - - - - - 30/04/2016 30/06/20 Plan Sewerage SW-22-I Bains Taniwal 16 Scheme Bains Taniwal Block- Post HSP1 Distt Review Hoshiarpur. Division Hoshiarpur-2 Water Supply Schemes: 1 Rajowal 48.00 PRWSSIP-HSP-Div- Prov. Independent 48.00 NCB 15/01/2015 15/04/2015 15/05/2015 01/06/2015 30/06/2015 30/07/2015 - - - - - 30/04/2016 30/06/20 - Plan W/S Scheme Rajowal 213-I 16 (1 No. village) (Bifurcation from existing W/S Scheme Dhodo Majara) Pkg-1 Post T/Well, OHSR, Pump Review chamber, Civil work etc. Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 2 Rehsiwal 45.00 PRWSSIP-HSP-Div- Prov. Independent 45.00 NCB 15/01/2015 15/04/2015 15/05/2015 01/06/2015 30/06/2015 30/07/2015 - - - - - 30/04/2016 30/06/20 - Plan W/S Scheme Rehsiwal 214-I 16 (1 No. village) (Bifurcation from existing W/S Scheme Dhoda Majara) Pkg-1 Post T/Well, OHSR, Pump Review chamber, Civil work etc. 3 Jian 55.00 PRWSSIP-HSP-Div- Prov. Independent 55.00 NCB 15/01/2015 15/04/2015 15/05/2015 01/06/2015 30/06/2015 30/07/2015 - - - - - 30/04/2016 30/06/20 - Plan W/S Scheme Jian 215-I 16 (Bifurcation from existing W/S Scheme Post Lehli Khurd) Pkg-1 Review T/Well, OHSR, Pump chamber, Civil work etc. 4 Attowal 50.00 PRWSSIP-HSP-Div- Prov. Independent 50.00 NCB 15/01/2015 15/04/2015 15/05/2015 01/06/2015 30/06/2015 30/07/2015 - - - - - 30/04/2016 30/06/20 - Plan W/S Scheme Attowal 216-I 16 (Bifurcation from existing W/S Scheme Marnian Kalan) Post Pkg-1 T/Well, OHSR, Review Pump chamber, Civil work etc. 5 Saleran 58.00 PRWSSIP-HSP-Div- Prov. Independent 58.00 NCB 15/01/2015 15/04/2015 15/05/2015 01/06/2015 30/06/2015 30/07/2015 - - - - - 30/04/2016 30/06/20 - Plan W/S Scheme Saleran 217-I 16 (Bifurcation from existing W/S Scheme Chohal) Pkg-1 Post T/Well,OHSR, Pump Review chamber, Civil work etc. 6 Jahan Khelan 65.00 PRWSSIP-HSP-Div- Prov. Independent 65.00 NCB 15/01/2015 15/04/2015 15/05/2015 01/06/2015 30/06/2015 30/07/2015 - - - - - 30/04/2016 30/06/20 - Plan W/S Scheme Jahan 218-I 16 Khelan (Bifurcation from existing W/S Scheme Bassi Mustfa) Post Pkg-1 T/Well,OHSR, Review Pump chamber, Civil work etc. Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 7 Daffer 62.00 PRWSSIP-HSP-Div- Prov. Independent 62.00 NCB 15/01/2015 15/04/2015 15/05/2015 01/06/2015 30/06/2015 30/07/2015 - - - - - 30/04/2016 30/06/20 - Plan W/S Scheme Daffer 219-I 16 (Bifurcation from existing W/S Scheme Jhajar Chatial) Pkg-1 Post T/Well,OHSR, Pump Review chamber, Civil work etc. 8 Baruhi 58.00 PRWSSIP-HSP-Div- Prov. Independent 58.00 NCB 15/01/2015 15/04/2015 15/05/2015 01/06/2015 30/06/2015 30/07/2015 - - - - - 30/04/2016 30/06/20 - Plan W/S Scheme Brauhi 220-I 16 (Bifurcation from existing W/S Scheme Koi) Pkg-1 Post T/Well,OHSR/UGSR, Review Pump chamber, Civil work etc. Performance Improvement Schemes: 1 Bihala 5.00 PRWSSIP-HSR-Div- Prov. & Fixing 5.00 NS 15/01/2015 15/04/2015 15/05/2015 01/06/2015 30/06/2015 30/07/2015 - - - - - 30/09/2015 31/10/20 - Plan Post IMP-105-I 110mm o/d PVC Review 15 Pipe etc. 2 Raghwal 30.00 PRWSSIP-HSR-Div- Prov. & installing 30.00 NCB 15/01/2015 15/04/2015 15/05/2015 01/06/2015 30/06/2015 30/07/2015 - - - - - 31/01/2016 31/03/20 - Plan IMP-106-I T/Well, Pumping 16 Machinery and Post Pipe Line etc. Review Division-Garhshankar Water Supply Schemes: 1 Helran 50.73 PRWSSIP-HSP-GRSR- Prov. Independent 25.00 NCB 30/11/2014 28/02/2015 31/03/2015 1/4/2015 30/04/2015 28/05/2015 - - - - - 30/09/2015 30/09/20 - Plan W/S Scheme Helran (2 Bariana Div-221-I 15 No. villages) (Bifurcation from Post existing W/S Scheme Review Kukran) Pkg-1 Tubewell Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-HSP-GRSR- Prov. Independent 25.73 NCB 30/11/2014 28/02/2015 31/03/2015 1/4/2015 30/04/2015 28/05/2015 - - - - - 30/11/2015 31/12/20 - Plan W/S Scheme Helran Div-221-II 15 (Bifurcation from existing W/S Scheme Kukran) Pkg-2 OHSR, Post Pump chamber, Civil Review work etc. 2 Nainwan 158.94 PRWSSIP-HSP-GRSR- Prov. Independent 40.00 NCB 30/11/2014 28/02/2015 31/03/2015 1/4/2015 30/04/2015 28/05/2015 - - - - - 30/11/2015 31/12/20 - Plan W/S Scheme Nainwan Div-222-I 15 (Bifurcation from existing W/S Scheme Post Seikhowal) Pkg-1 Review Tubewell PRWSSIP-HSP-GRSR- Prov. Independent 118.94 NCB 30/11/2014 28/02/2015 31/03/2015 1/4/2015 30/04/2015 28/05/2015 - - - - - 30/11/2015 31/01/20 - Plan W/S Scheme Nainwan Div-222-II 16 (Bifurcation from existing W/S Scheme Seikhowal) Pkg-2 Post OHSR, Pump chamber, Review Civil work etc. 3 Suna 63.08 PRWSSIP-HSP-GRSR- Aug. of W/S Scheme 23.00 NCB 30/11/2014 28/02/2015 31/03/2015 1/4/2015 30/04/2015 28/05/2015 - - - - - 30/09/2015 30/09/20 - Plan Post Suna Div-223-I Review 15 Pkg-1 Tubewell PRWSSIP-HSP-GRSR- Aug. W/S Scheme 40.08 NCB 30/11/2014 28/02/2015 31/03/2015 1/4/2015 30/04/2015 28/05/2015 - - - - - 30/11/2015 31/12/20 - Plan Suna Pkg-2 OHSR, Post Div-223-II 15 Pump chamber, Civil Review work etc. Performance Improvement Schemes: 1 Sarangwal 7.00 PRWSSIP-HSP-GHSR- Prov. & installing 7.00 NS 30/11/2014 28/02/2015 31/03/2015 1/4/2015 15/04/2015 30/04/2015 - - - - - 30/06/2015 31/07/20 - Plan Div-IMP-107-I water meter 15mm 15 i/d of reputed make Post Review alongwith acessories. 2 Nurpur Jattan 3.50 PRWSSIP-HSP-GHSR- Prov. & installing 3.50 NS 30/11/2014 28/02/2015 31/03/2015 1/4/2015 15/04/2015 30/04/2015 - - - - - 30/06/2015 31/07/20 - Plan Div-IMP-108-I water meter 15mm 15 i/d of reputed make Post Review alongwith acessories. Division-Talwara Water Supply Schemes: Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 1 Mahadpur 61.00 PRWSSIP-HSP-TLR- Prov. Independent 13.50 NCB 30/11/2014 28/02/2015 31/03/2015 1/4/2015 30/04/2015 28/05/2015 - - - - - 30/09/2015 31/10/20 - Plan W/S Scheme Div-224-I 15 Mahadpur (1 No. villages) (Bifurcation Post from existing W/S Review Scheme Tanda Churian) Pkg-1 Tubewell PRWSSIP-HSP-TLR- Prov. Independent 35.00 NCB 30/11/2014 28/02/2015 31/03/2015 1/4/2015 30/04/2015 28/05/2015 - - - - - 28/02/2016 31/07/20 - Plan W/S Scheme Div-224-II 16 Mahadpur (Bifurcation from existing W/S Scheme Tanda Post Churian) Pkg-2 Pump Review chamber, Civil work etc. PRWSSIP-HSP-TLR- Prov. Independent 12.50 NCB 30/11/2014 28/02/2015 31/03/2015 1/4/2015 30/04/2015 28/05/2015 - - - - - 30/09/2015 31/10/20 - Plan W/S Scheme Div-224-III 15 Mahadpur (Bifurcation from existing W/S Post Scheme Tanda Review Churian) Pkg-3 OHSR. 2 Salehrian 58.00 PRWSSIP-HSP-TLR- Prov. Independent 13.50 NCB 30/11/2014 28/02/2015 31/03/2015 1/4/2015 30/04/2015 28/05/2015 - - - - - 30/09/2015 31/10/20 - Plan W/S Scheme Salehrian Kalan Div-225-I 15 Kalan (Bifurcation Post from existing W/S Review Scheme Manjpur) Pkg- 1 Tubewell PRWSSIP-HSP-TLR- Prov. Independent 32.00 NCB 30/11/2014 28/02/2015 31/03/2015 1/4/2015 30/04/2015 28/05/2015 - - - - - 28/02/2016 31/07/20 - Plan W/S Scheme Salehrian Div-225-II 16 Kalan (Bifurcation from existing W/S Post Scheme Manjpur) Pkg- Review 2 Pump chamber, Civil work etc. PRWSSIP-HSP-TLR- Prov. Independent 12.50 NCB 30/11/2014 28/02/2015 31/03/2015 1/4/2015 30/04/2015 28/05/2015 - - - - - 30/09/2015 31/10/20 - Plan W/S Scheme Salehrian Div-225-III 15 Kalan (Bifurcation Post from existing W/S Review Scheme Manjpur) Pkg- 3 OHSR. Performance Improvement Schemes: Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 1 Mansoorpur 5.00 PRWSSIP-Talwara- Prov., laying, 5.00 NS 30/11/2014 28/02/2015 31/03/2015 1/4/2015 15/04/2015 30/04/2015 - - - - - 30/06/2015 31/07/20 - Plan Div-IMP-109-I jointing and 15 Post testing pipe line in Review uncovered area of village SBS Nagar Water Supply 1 Maksudpur 55.43 PRWSSIP-SBS-Div- W/S Scheme 55.43 NCB 15.01.15 31.01.15 16.02.15 Post- 20.02.15 20.03.15 05.04.15 Post- 20.04.15 - - - 20.01.16 31.03.16 - Plan 226-I Maksudpur : Pkg-1 Review Review T/W, OHSR & Distribution 2 Gunachaur 75.00 PRWSSIP-SBS-Div- W/S Scheme 75.00 NCB 20.01.15 05.02.15 20.02.15 Post- 25.02.15 25.03.15 10.04.15 Post- 25.04.15 - - - 25.01.16 31.03.16 - Plan 227-I Gunachaur : Pkg-1 Review Review T/W, OHSR & Distribution 3 Mukandpur 135.11 PRWSSIP-SBS-Div- W/S Scheme 135.11 NCB 25.01.15 10.02.15 25.02.15 Post- 28.02.15 29.03.15 15.04.15 Post- 30.04.15 - - - 30.01.16 31.03.16 - Plan 228-I Mukandpur : Pkg-1 Review Review T/W, OHSR & Distribution 4 Majara Khurd 28.54 PRWSSIP-SBS-Div- W/S Scheme Majara 28.54 NCB 15.01.15 31.01.15 16.02.15 Post- 20.02.15 20.03.15 05.04.15 Post- 20.04.15 - - - 20.01.16 31.03.16 - Plan 229-I Khurd : Pkg-1 T/W, Review Review OHSR & Distribution 5 Karyiam 97.61 PRWSSIP-SBS-Div- W/S Scheme 97.61 NCB 31.01.15 20.02.15 03.03.15 Post- 31.03.15 30.04.15 31.05.14 Post- 05.06.15 - - - 05.03.16 30.04.16 - Plan Hussain Chak 230-I Karyiam Hussain Review Review Chak : Pkg-1 T/W, OHSR & Distribution 6 Sujjowal 68.35 PRWSSIP-SBS-Div- W/S Scheme 68.35 NCB 15.01.15 31.01.15 16.02.15 Post- 20.02.15 20.03.15 05.04.15 Post- 20.04.15 - - - 20.01.16 31.03.16 - Plan Nanowal 231-I Sujjowal Nanowal : Review Review Pkg-1 T/W, OHSR & Distribution 7 Ghamour 69.00 PRWSSIP-SBS-Div- W/S Scheme 69.00 NCB 28.02.15 15.03.15 05.04.15 Post- 30.04.15 30.05.15 20.06.15 Post- 01.07.15 - - - 31.03.16 31.05.16 - Plan 232-I Ghamour : Pkg-1 Review Review T/W, OHSR & Distribution Sewerage 1 Sakohpur 167.49 PRWSSIP-SSB-Div- Providing and lying 167.49 NCB 15.02.15 28.02.15 30.03.15 Post- 20.04.15 20.05.15 15.06.15 Post- 07.07.15 - - - 07.07.16 - - Plan solid free sewerage SW-22-I Review Review system for village Sakohpur: Pipe sewer pumping station and disposal work ......complete in all respect Perfromance Improvement Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 1 Pathlawa 15.30 PRWSSIP-SBS-Div- Development of W/S, 15.30 NCB 15.01.15 31.01.15 16.02.15 Post- 20.02.15 20.03.15 05.04.15 Post- 20.04.15 - - - 20.06.15 30.06.15 - Plan Distribution and IMP-110-I Review Review Disinfection Unit 2 Uttal 3.50 PRWSSIP-SBS-Div- Metering and 3.50 NS 15.01.15 31.01.15 16.02.15 Post- 20.02.15 20.03.15 05.04.15 Post- 20.04.15 - - - 20.06.15 30.06.15 - Plan Plan IMP-111-I 24X7 W/S Review Review 3 Simble Majara 6.94 PRWSSIP-SBS-Div- Metering and 6.94 NS 15.01.15 31.01.15 16.02.15 Post- 20.02.15 20.03.15 05.04.15 Post- 20.04.15 - - - 20.06.15 30.06.15 - IMP-112-I 24X7 W/S Review Review Circle Amritsar District Amritsar Water Supply Schemes Distt. Amritsar PRWSSIP-ASR-Div- NCB Post Plan Dhariwal 1 (2634) 40.00 233-I Prov. T/Well, Civil 40.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Dial Pura 2 32.00 234-I Prov. T/Well, Civil 32.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2639) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Ballarwal 3 35.00 235-I Prov. T/Well, Civil 35.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2606) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Tera Khurd 4 40.00 236-I Prov. T/Well, Civil 40.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2746) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan 5 Sarai (2733) 38.00 237-I Prov. T/Well, Civil 38.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan 6 Rokhey (2725) 38.00 238-I Prov. T/Well, Civil 38.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Kot Razada 7 35.00 239-I Prov. T/Well, Civil 35.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2678) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan 8 Rajian (2722) 35.00 240-I Prov. T/Well, Civil 35.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan 9 Bhadiar (3092) 28.00 241-I Prov. T/Well, Civil 28.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan 10 Chicha (3098) 55.00 242-I Prov. T/Well, Civil 55.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Galluwal 11 30.00 243-I Prov. T/Well, Civil 30.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3101) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Jhanjarpur 12 30.00 244-I Prov. T/Well, Civil 30.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3108) Work and OHSR Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-ASR-Div- NCB Post Plan Dande 13 32.00 245-I Prov. T/Well, Civil 32.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (12750) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Chak Mukand 14 50.00 246-I Prov. T/Well, Civil 50.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2952) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Awan Lakha 15 32.00 247-I Prov. T/Well, Civil 32.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Singh (2756) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan 16 Bhalot (2765) 25.00 248-I Prov. T/Well, Civil 25.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Bhangwan 17 35.00 249-I Prov. T/Well, Civil 35.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2766) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Dalley Ke 18 30.00 250-I Prov. T/Well, Civil 30.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2789) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan 19 Dhadal (2790) 28.00 251-I Prov. T/Well, Civil 28.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Hetampura 20 40.00 252-I Prov. T/Well, Civil 40.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2798) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Khiala Khurd 21 40.00 253-I Prov. T/Well, Civil 40.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2811) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Kotli Khaira 22 28.00 254-I Prov. T/Well, Civil 28.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2821) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan 23 Maure (2833) 40.00 255-I Prov. T/Well, Civil 40.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Mehmadpura 24 35.00 256-I Prov. T/Well, Civil 35.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2834) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan 25 Rai (2849) 35.00 257-I Prov. T/Well, Civil 35.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan 26 Saurian (2854) 35.00 258-I Prov. T/Well, Civil 35.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan 27 Tapiala (2860) 40.00 259-I Prov. T/Well, Civil 40.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan 28 Tarin (2861) 28.00 260-I Prov. T/Well, Civil 28.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan 29 Nurpur (2843) 38.00 261-I Prov. T/Well, Civil 38.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-ASR-Div- NCB Post Plan Chainpur 30 40.00 262-I Prov. T/Well, Civil 40.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3039) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Dhariwal 31 34.00 263-I Prov. T/Well, Civil 34.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3045) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Ghukewali 32 40.00 264-I Prov. T/Well, Civil 40.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3047) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Lalla Afghana 33 35.00 265-I Prov. T/Well, Civil 35.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3063) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Majjupura 34 40.00 266-I Prov. T/Well, Civil 40.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3066) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Nangal Tola 35 52.00 267-I Prov. T/Well, Civil 52.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3072) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Sangat Pura 36 55.00 268-I Prov. T/Well, Civil 55.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3081) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Shahpur 37 30.00 269-I Prov. T/Well, Civil 30.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3083) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Khatrai Kalan 38 40.00 270-I Prov. T/Well, Civil 40.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3057) Work and OHSR PRWSSIP-ASR-Div- NCB Post Plan Khatrai Khurd 39 35.00 271-I Prov. T/Well, Civil 35.00 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3058) Work and OHSR PRWSSIP-ASR-Div- Post Plan Devidass Pura 40 70.00 272-I Prov. T/Well, Civil 70.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3000) Work and OHSR PRWSSIP-ASR-Div- Post Plan 41 Jand (12740) 40.00 273-I Prov. T/Well, Civil 40.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-ASR-Div- Post Plan 42 Mallian (3009) 60.00 274-I Prov. T/Well, Civil 60.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-ASR-Div- Post Plan Timmowala 43 115.00 275-I Prov. T/Well, Civil 115.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3029) Work and OHSR PRWSSIP-ASR-Div- Post Plan Wadali Dogran 44 40.00 276-I Prov. T/Well, Civil 40.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (12748) Work and OHSR PRWSSIP-ASR-Div- Post Plan Dadupura 45 40.00 277-I Prov. T/Well, Civil 40.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2890) Work and OHSR PRWSSIP-ASR-Div- Post Plan Umarpura 46 28.00 278-I Prov. T/Well, Civil 28.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (12719) Work and OHSR Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-ASR-Div- Post Plan Bal Sarai 47 68.00 279-I Prov. T/Well, Civil 68.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2542) Work and OHSR PRWSSIP-ASR-Div- Post Plan 48 Danial (2550) 35.00 280-I Prov. T/Well, Civil 35.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-ASR-Div- Post Plan Dhardeo 49 85.00 281-I Prov. T/Well, Civil 85.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (12691) Work and OHSR Khera PRWSSIP-ASR-Div- Post Plan 50 Thanewal 30.00 282-I Prov. T/Well, Civil 30.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2569) Work and OHSR PRWSSIP-ASR-Div- Post 51 Nangli (2575) 55.00 283-I Plan Prov. T/Well, Civil 55.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-ASR-Div- Post Plan Khera Bala 52 40.00 284-I Prov. T/Well, Civil 40.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Chak (2512) Work and OHSR PRWSSIP-ASR-Div- Post Plan Malik Nangal 53 35.00 285-I Prov. T/Well, Civil 35.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2515) Work and OHSR PRWSSIP-ASR-Div- Post Plan Miran Chak 54 40.00 286-I Prov. T/Well, Civil 40.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2520) Work and OHSR PRWSSIP-ASR-Div- Post Plan Udhoke Kalan 55 55.00 287-I Prov. T/Well, Civil 55.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2540) Work and OHSR PRWSSIP-ASR-Div- Post Plan Dhaul Kalan 56 52.00 288-I Prov. T/Well, Civil 52.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2954) Work and OHSR Fatehgarh PRWSSIP-ASR-Div- Post Plan 57 Shukar Chak 85.00 289-I Prov. T/Well, Civil 85.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2956) Work and OHSR PRWSSIP-ASR-Div- Post Plan Gaunsabad 58 35.00 290-I Prov. T/Well, Civil 35.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2957) Work and OHSR PRWSSIP-ASR-Div- Post Plan Kotla Dal 59 30.00 291-I Prov. T/Well, Civil 30.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Singh (2970) Work and OHSR PRWSSIP-ASR-Div- Post Plan Loharka Kalan 60 55.00 292-I Prov. T/Well, Civil 55.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (2973) Work and OHSR PRWSSIP-ASR-Div- Post Plan 61 Nangli (2982) 55.00 293-I Prov. T/Well, Civil 55.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR Water Treatment Plants Distt. Amritsar Hashampura PRWSSIP-ASR-WQ- Post Plan Plan 62 20.00 Water Treatment 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 (2657) Div-1-I Plant Review Kiampura PRWSSIP-ASR-WQ- Water Treatment Post 63 (2674) 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-2-I Plant Review Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Kuralian PRWSSIP-ASR-WQ- Post Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 64 20.00 Water Treatment 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 (12728) Div-3-I Plant Review Malakpur PRWSSIP-ASR-WQ- Water Treatment Post 65 (2698) 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-4-I Plant Review Rukhe PRWSSIP-ASR-WQ- Water Treatment Post 66 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-5-I Plant Review Mattian PRWSSIP-ASR-WQ- Water Treatment Post 67 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-6-I Plant Review Hardo Putli PRWSSIP-ASR-WQ- Water Treatment Post 68 (2655) 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-7-I Plant Review Bagrian (3091) PRWSSIP-ASR-WQ- Water Treatment Post 69 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-8-I Plant Review Mulakot PRWSSIP-ASR-WQ- Water Treatment Post 70 (2839) 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-9-I Plant Review Makhanpura PRWSSIP-ASR-WQ- Water Treatment Post 71 (2829) 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-10-I Plant Review Bachiwind PRWSSIP-ASR-WQ- Water Treatment Post 72 (2757) 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-11-I Plant Review Chak Allah PRWSSIP-ASR-WQ- Water Treatment Post 73 Baksh (2777) 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-12-I Plant Review Dala (1595) PRWSSIP-ASR-WQ- Water Treatment Post 74 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-13-I Plant Review Mehmadpura PRWSSIP-ASR-WQ- Water Treatment Post 75 (2834) 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-14-I Plant Review Dharamkot PRWSSIP-ASR-WQ- Water Treatment Post 76 (3044) 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-15-I Plant Review Kakar (2804) PRWSSIP-ASR-WQ- Water Treatment Post 77 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-16-I Plant Review Saurian (2854) PRWSSIP-ASR-WQ- Water Treatment Post 78 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-17-I Plant Review Tarin (2861) PRWSSIP-ASR-WQ- Water Treatment Post 79 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-18-I Plant Review Thathi (2863) PRWSSIP-ASR-WQ- Water Treatment Post 80 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-19-I Plant Review Veroke (2870) PRWSSIP-ASR-WQ- Water Treatment Post 81 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-20-I Plant Review Bhittewad PRWSSIP-ASR-WQ- Water Treatment Post 82 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-21-I Plant Review Timmowala PRWSSIP-ASR-WQ- Water Treatment Post 83 (3029) 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-22-I Plant Review Gujjarpura PRWSSIP-ASR-WQ- Water Treatment Post 84 (2650) 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-23-I Plant Review Kadia Bad PRWSSIP-ASR-WQ- Water Treatment Post 85 Chhota 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-24-I Plant Review Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Waryam PRWSSIP-ASR-WQ- Post Plan Plan Plan Plan 86 20.00 Water Treatment 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Nangal (2943) Div-25-I Plant Review Dhardeo PRWSSIP-ASR-WQ- Water Treatment Post 87 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-26-I Plant Review Jodha Nagri PRWSSIP-ASR-WQ- Water Treatment Post 88 (2509) 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-27-I Plant Review Malowal PRWSSIP-ASR-WQ- Water Treatment 89 (2516) 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 NA 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Div-28-I Plant District TaranTarn Water Supply Schemes Distt. Tarn Taran PRWSSIP-TRN-Div- Bur Chand Plan Post 93 (3445) 28.00 295-I Prov. T/Well, Civil 28.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan 94 Dhun (3451) 54.00 296-I Prov. T/Well, Civil 54.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan Mari Kamboke 95 123.00 297-I Prov. T/Well, Civil 123.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3468) Work and OHSR PRWSSIP-TRN-Div- Post Plan Mari Udhoke 96 61.50 298-I Prov. T/Well, Civil 61.50 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3472) Work and OHSR PRWSSIP-TRN-Div- Post Plan 97 Veeram (3490) 40.00 299-I Prov. T/Well, Civil 40.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan 98 Algon (3433) 130.00 300-I Prov. T/Well, Civil 130.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan 99 Khalra (3462) 180.00 301-I Prov. T/Well, Civil 180.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan 100 Dal (3448) 127.00 302-I Prov. T/Well, Civil 127.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan Mari 101 30.00 303-I Prov. T/Well, Civil 30.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Samra(3471) Work and OHSR PRWSSIP-TRN-Div- Post Plan 102 Hundal(3458) 6.00 304-I Prov. T/Well, Civil 6.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan 103 Bua Patti(3444) 30.00 305-I Prov. T/Well, Civil 30.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan Brahampura 104 72.00 306-I Prov. T/Well, Civil 72.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3495) Work and OHSR PRWSSIP-TRN-Div- Post Plan 105 Dhala (3308) 50.00 307-I Prov. T/Well, Civil 50.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-TRN-Div- Post Plan 106 Dodey (3310) 36.00 308-I Prov. T/Well, Civil 36.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan Gaggo Bua 107 133.00 309-I Prov. T/Well, Civil 133.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3311) Work and OHSR PRWSSIP-TRN-Div- Post Plan Gandiwind 108 145.00 310-I Prov. T/Well, Civil 145.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3312) Work and OHSR PRWSSIP-TRN-Div- Post Plan Khairdeen Ke 109 85.00 311-I Prov. T/Well, Civil 85.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3318) Work and OHSR PRWSSIP-TRN-Div- Post 110 Gehri(3313) 44.00 312-I Plan Prov. T/Well, Civil 44.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan 111 Khojkipur (3154) 53.00 313-I Prov. T/Well, Civil 53.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan Sakkianwali 112 40.00 314-I Prov. T/Well, Civil 40.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3167) Work and OHSR PRWSSIP-TRN-Div- Post Plan Sarai Talwandi 113 42.00 315-I Prov. T/Well, Civil 42.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3171) Work and OHSR PRWSSIP-TRN-Div- Post Plan 114 Waring (12755) 59.00 316-I Prov. T/Well, Civil 59.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan Hardo 115 108.00 317-I Prov. T/Well, Civil 108.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Sarli(3146) Work and OHSR PRWSSIP-TRN-Div- Post Plan Jawandpur(1276 116 42.00 318-I Prov. T/Well, Civil 42.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 8) Work and OHSR PRWSSIP-TRN-Div- Post Plan 117 Mandiala(3161) 35.00 319-I Prov. T/Well, Civil 35.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan 118 Banian (3127) 69.00 320-I Prov. T/Well, Civil 69.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan Ekal Gadda 119 105.00 321-I Prov. T/Well, Civil 105.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3139) Work and OHSR PRWSSIP-TRN-Div- Post Plan Bhattal Bhaike 120 61.00 322-I Prov. T/Well, Civil 61.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3253) Work and OHSR PRWSSIP-TRN-Div- Post Plan 121 Chutala (3258) 91.00 323-I Prov. T/Well, Civil 91.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan 122 Dial (3259) 36.00 323-I Prov. T/Well, Civil 36.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-TRN-Div- Post Plan Dugalwala 123 40.00 324-I Prov. T/Well, Civil 40.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 (3260) Work and OHSR PRWSSIP-TRN-Div- Post Plan 124 Jandoke (3265) 40.00 325-I Prov. T/Well, Civil 40.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan Shingarpur(3290 125 35.00 326-I Prov. T/Well, Civil 35.00 NCB 01.04.15 01.05.15 15.05.15 Review 10.06.15 10.07.15 01.08.15 15.08.15 01.09.15 - - - 01.10.16 31.10.16 ) Work and OHSR PRWSSIP-TRN-Div- Post Plan Rure 126 66.00 327-I Prov. T/Well, Civil 66.00 NCB 01.04.15 01.05.15 15.05.15 Review 10.06.15 10.07.15 01.08.15 15.08.15 01.09.15 - - - 01.10.16 31.10.16 Assal(3285) Work and OHSR PRWSSIP-TRN-Div- Post 127 Kaler(3271) 36.00 328-I Plan Prov. T/Well, Civil 36.00 NCB 01.04.15 01.05.15 15.05.15 Review 10.06.15 10.07.15 01.08.15 15.08.15 01.09.15 - - - 01.10.16 31.10.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan 128 Jallowala (3264) 40.00 329-I Prov. T/Well, Civil 40.00 NCB 01.04.15 01.05.15 15.05.15 Review 10.06.15 10.07.15 01.08.15 15.08.15 01.09.15 - - - 01.10.16 31.10.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan 129 Kairon (3206) 205.00 330-I Prov. T/Well, Civil 205.00 NCB 01.04.15 01.05.15 15.05.15 Review 10.06.15 10.07.15 01.08.15 15.08.15 01.09.15 - - - 01.10.16 31.10.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan 130 Kulla (3212) 68.00 331-I Prov. T/Well, Civil 68.00 NCB 01.04.15 01.05.15 15.05.15 Review 10.06.15 10.07.15 01.08.15 15.08.15 01.09.15 - - - 01.10.16 31.10.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan Sirhali Mandan 131 120.00 332-I Prov. T/Well, Civil 120.00 NCB 01.04.15 01.05.15 15.05.15 Review 10.06.15 10.07.15 01.08.15 15.08.15 01.09.15 - - - 01.10.16 31.10.16 (3236) Work and OHSR PRWSSIP-TRN-Div- Post Plan Thakarpura 132 68.00 333-I Prov. T/Well, Civil 68.00 NCB 01.04.15 01.05.15 15.05.15 Review 10.06.15 10.07.15 01.08.15 15.08.15 01.09.15 - - - 01.10.16 31.10.16 (3243) Work and OHSR PRWSSIP-TRN-Div- Post Plan Talwandi Sobha 133 68.00 334-I Prov. T/Well, Civil 68.00 NCB 01.04.15 01.05.15 15.05.15 Review 10.06.15 10.07.15 01.08.15 15.08.15 01.09.15 - - - 01.10.16 31.10.16 Singh(3242) Work and OHSR PRWSSIP-TRN-Div- Post Plan 134 Sangwan(3235) 48.00 335-I Prov. T/Well, Civil 48.00 NCB 01.04.15 01.05.15 15.05.15 Review 10.06.15 10.07.15 01.08.15 15.08.15 01.09.15 - - - 01.10.16 31.10.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan Alladinpur 135 85.00 336-I Prov. T/Well, Civil 85.00 NCB 01.04.15 01.05.15 15.05.15 Review 10.06.15 10.07.15 01.08.15 15.08.15 01.09.15 - - - 01.10.16 31.10.16 (3332) Work and OHSR PRWSSIP-TRN-Div- Post Plan Bhaini Sidhwan 136 47.00 337-I Prov. T/Well, Civil 47.00 NCB 01.04.15 01.05.15 15.05.15 Review 10.06.15 10.07.15 01.08.15 15.08.15 01.09.15 - - - 01.10.16 31.10.16 (3337) Work and OHSR PRWSSIP-TRN-Div- Post Plan 137 Dublian (12791) 37.00 337-I Prov. T/Well, Civil 37.00 NCB 01.04.15 01.05.15 15.05.15 Review 10.06.15 10.07.15 01.08.15 15.08.15 01.09.15 - - - 01.10.16 31.10.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan Jarmastpur 138 60.00 338-I Prov. T/Well, Civil 60.00 NCB 01.04.15 01.05.15 15.05.15 Review 10.06.15 10.07.15 01.08.15 15.08.15 01.09.15 - - - 01.10.16 31.10.16 (3344) Work and OHSR PRWSSIP-TRN-Div- Post Plan 139 Valtoha (3431) 285.00 339-I Prov. T/Well, Civil 285.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Work and OHSR Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-TRN-Div- Post Plan 140 Varnala (3432) 123.00 340-I Prov. T/Well, Civil 123.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Work and OHSR PRWSSIP-TRN-Div- Post Plan Wan Tara Singh 141 125.00 341-I Prov. T/Well, Civil 125.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 (12808) Work and OHSR PRWSSIP-TRN-Div- Post Plan Thathi Jaimal 142 40.00 342-I Prov. T/Well, Civil 40.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Singh (3429) Work and OHSR PRWSSIP-TRN-Div- Post Plan 143 Sankatra (3427) 42.00 343-I Prov. T/Well, Civil 42.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.01.16 15.02.16 Work and OHSR Water Treatment Plants Distt. Tarn Taran Abadi Dera PRWSSIP-TRN-WQ- Post Plan 203 Singh (14949) 20.00 Div-29-I Water Treatment 20.00 NCB 01.04.15 01.05.15 15.05.15 Review 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Plant Karamuwala PRWSSIP-TRN-WQ- Post Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 204 20.00 Water Treatment 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Div-30-I Plant Review Raniwalah PRWSSIP-TRN-WQ- Water Treatment Post 205 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Div-31-I Plant Review Brahampura PRWSSIP-TRN-WQ- Water Treatment Post 206 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Div-32-I Plant Review Sangatpura PRWSSIP-TRN-WQ- Water Treatment Post 207 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Div-33-I Plant Review Balehar (7872) PRWSSIP-TRN-WQ- Water Treatment Post 208 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Div-34-I Plant Review Gill pun PRWSSIP-TRN-WQ- Water Treatment Post 209 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Div-35-I Plant Review Margindpura PRWSSIP-TRN-WQ- Water Treatment Post 210 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Div-36-I Plant Review Kacha Pakka PRWSSIP-TRN-WQ- Water Treatment Post 211 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Div-37-I Plant Review Theh Chahal PRWSSIP-TRN-WQ- Water Treatment Post 212 (3246) 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Div-38-I Plant Review Shkar Chack PRWSSIP-TRN-WQ- Water Treatment Post 213 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Div-39-I Plant Review Leian PRWSSIP-TRN-WQ- Water Treatment Post 214 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Div-40-I Plant Review Kheda PRWSSIP-TRN-WQ- Water Treatment Post 215 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Div-41-I Plant Review Lalpura PRWSSIP-TRN-WQ- Water Treatment Post 216 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Div-42-I Plant Review Abadi Sheikh PRWSSIP-TRN-WQ- Water Treatment Post 217 Chak 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Div-43-I Plant Review Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Malmohri PRWSSIP-TRN-WQ- Post Plan Plan Plan Plan Plan Plan 218 20.00 Water Treatment 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Div-44-I Plant Review Baghail Singh PRWSSIP-TRN-WQ- Water Treatment Post 219 Wala-2 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Div-45-I Plant Review Musse PRWSSIP-TRN-WQ- Water Treatment Post 220 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Div-46-I Plant Review Doblian PRWSSIP-TRN-WQ- Water Treatment Post 221 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Div-47-I Plant Review Panori Hassan PRWSSIP-TRN-WQ- Water Treatment Post 222 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Div-48-I Plant Review Lalu Ghuman PRWSSIP-TRN-WQ- Water Treatment Post 223 20.00 20.00 NCB 01.04.15 01.05.15 15.05.15 01.06.15 01.07.15 01.08.15 ` 01.09.15 - - NA 31.03.16 30.04.16 Div-49-I Plant Review Central Zone Circle Chandigarh DISTRICT Ropar W/S/S DIVISION No. 1, ROPAR AT ANANDPUR SAHIB 1 CHANDPUR 75.25 PRWSSIP-Ropar-Div- T/well 75.25 NCB 15-Jan-15 31-Jan-15 28-Feb-15 01/03/15 01/04/15 15/04/15 Yet to 6-May-15 - - - 2-May-16 - - Plan OHSR Post 344-I Review ascertain Civil work 2 75.25 PRWSSIP-Ropar-Div- T/well 92.16 NCB 15-Jan-15 31-Jan-15 28-Feb-15 01/03/15 01/04/15 15/04/15 Yet to 6-May-15 - - - 2-May-16 - - Plan PLASSSI- Post SINGHPURA 345-I OHSR ascertain Review Civil work W/S/S Division No.2 Rupnagar 5 PRWSSIP-Ropar-Div- Water supply 67.00 NCB 15-Jan-15 20-Feb-15 28-Feb-15 Post 1/3/15 2/4/15 15/4/15 Post Review 6-May-15 - - - 31-Dec-15 - - Plan Majri Jattan 67.00 346-I Review 6 PRWSSIP-Ropar-Div- Water supply 52.00 NCB 15-Jan-15 20-Feb-15 28-Feb-15 Post 1/3/15 2/4/15 15/4/15 Post Review 6-May-15 - - - 31-Dec-15 - - Plan Makuri Kalan 52.00 / Khurd 347-I Review 7 PRWSSIP-Ropar-Div- Water supply 75.00 NCB 15-Jan-15 20-Feb-15 28-Feb-15 Post 1/3/15 2/4/15 15/4/15 Post Review 6-May-15 - - - 31-Dec-15 - - Plan Nathmalpur 75.00 348-I Review 8 PRWSSIP-Ropar-Div- Water supply 87.00 NCB 15-Jan-15 20-Feb-15 28-Feb-15 Post 1/3/15 2/4/15 15/4/15 Post Review 6-May-15 - - - 31-Dec-15 - - Plan Salempur 87.00 349-I Review 9 125.00 PRWSSIP-Ropar-Div- Water supply 125.00 NCB 15-Jan-15 20-Feb-15 28-Feb-15 Post 1/3/15 2/4/15 15/4/15 Post Review 6-May-15 - - - 31-Dec-15 - - Plan Ghanouli 350-I Review DISTRICT S A S NAGAR W/S/S DIVISION NO. 3, S.A.S. NAGAR Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 1 BADARPUR 48.37 PRWSSIP-Mohali- T/well 48.37 NCB 10-Jan-15 25-Jan-15 23-Feb-15 27/2/15 31/3/15 10/4/15 Post Review 30-Apr-15 - - - 31-Jan-16 - - Plan Post Div-351-I OHSR Review Civil work 2 SIMBAL MAJRA 47.12 PRWSSIP-Mohali- T/well 47.12 NCB 10-Jan-15 25-Jan-15 23-Feb-15 27/2/15 31/3/15 10/4/15 Post Review 30-Apr-15 - - - 31-Jan-16 - - Plan Post Div-352-I OHSR Review Civil work 3 NIMBUAN & 50.39 PRWSSIP-Mohali- T/well 50.39 NCB 10-Jan-15 25-Jan-15 23-Feb-15 27/2/15 31/3/15 10/4/15 Post Review 30-Apr-15 - - - 31-Jan-16 - - Plan BAHADURGAR Div-353-I OHSR Post Civil work Review H 4 BALIALI 52.09 PRWSSIP-Mohali- T/well 52.09 NCB 10-Jan-15 25-Jan-15 23-Feb-15 27/2/15 31/3/15 10/4/15 Post Review 30-Apr-15 - - - 31-Jan-16 - - Plan Post Div-354-I OHSR Review Civil work 5 GIGE MAJRA 70.27 PRWSSIP-Mohali- Plan T/well 70.27 NCB 10-Jan-15 25-Jan-15 23-Feb-15 Post 27/2/15 31/3/15 10/4/15 Post Review 30-Apr-15 - - - 31-Jan-16 - - Div-355-I OHSR Review Civil work 6 DAUN 135 PRWSSIP-Mohali- T/well 135.00 NCB 10-Jan-15 25-Jan-15 23-Feb-15 27/2/15 31/3/15 10/4/15 Post Review 30-Apr-15 - - - 31-Jan-16 Plan Post Div-356-I OHSR Review Civil work District Faridkot Div. Faridkot Water Supply Schemes 1 Water Supply 245.20 PRWSSIP-FDK-Div- Civil Work and Plan Plan Post 155.20 NCB 14.05.2012 01.03.2015 16.03.2015 25.03.2015 25.04.2015 10.05.2015 - - - - 16.05.2016 - - Scheme Kauni 357-I OHSR Review 17.05.201 PRWSSIP-FDK-Div- Continous Sand Post 357-II Filtration Unit 93.00 NCB 14.05.2012 01.03.2015 16.03.2015 Review 25.03.2015 25.04.2015 10.05.2015 - 17.05.201 - - - 16.05.2016 - - including O&M 5 2 Water Supply 83.25 PRWSSIP-FDK-Div- Plan Plan Civil Work and Post Scheme 83.25 NCB 01.02.2015 01.04.2015 16.04.2015 25.04.2015 25.05.2015 10.06.2015 - 17.06.201 - - - 16.06.2016 - - 358-I OHSR Review Midduman 5 PRWSSIP-FDK-Div- Continous Sand Post 358-II Filtration Unit 80.00 NCB 14.05.2012 01.04.2015 16.04.2015 Review 25.04.2015 25.05.2015 10.06.2015 - 17.06.201 - - - 16.06.2016 - - including O&M 5 3 Water Supply 152.00 PRWSSIP-FDK-Div- Plan Civil Work and Post Scheme Simre 80.00 NCB 01.10.2012 08.03.2015 23.03.2015 02.04.2015 02.05.2015 17.05.2015 - 24.05.201 - - - 23.05.2016 - - 359-I OHSR Review Wala 5 PRWSSIP-FDK-Div- Continous Sand Plan Post 359-II Filtration Unit 80.00 NCB 14.05.2012 08.03.2015 23.03.2015 Review 02.04.2015 02.05.2015 17.05.2015 - 24.05.201 - - - 23.05.2016 - - including O&M 5 4 Water Supply 187.52 PRWSSIP-FDK-Div- Plan Civil Work and Post Scheme Phide 360-I 115.52 NCB 17.02.2014 22.03.2015 07.04.2015 16.04.2015 16.05.2015 30.05.2015 - 07.06.201 - - - 07.06.2016 - - OHSR Review Kalan 5 PRWSSIP-FDK-Div- Plan Continous Sand Post 360-II Filtration Unit 80.00 NCB 14.05.2012 22.03.2015 07.04.2015 Review 16.04.2015 16.05.2015 30.05.2015 - 07.06.201 - - - 07.06.2016 - - including O&M 5 5 Water Supply 210.60 PRWSSIP-FDK-Div- Plan Civil Work and Post Scheme Behbal 120.60 NCB 27.03.2014 08.04.2015 23.04.2015 02.05.2015 02.06.2015 17.06.2015 - 24.06.201 - - - 23.06.2016 - - 361-I OHSR Review Kalan 5 Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Kalan PRWSSIP-FDK-Div- Continous Sand Plan Post 361-II Filtration Unit 93.00 NCB 14.05.2012 08.04.2015 23.04.2015 Review 02.05.2015 02.06.2015 17.06.2015 - 24.06.201 - - - 23.06.2016 - - including O&M 5 6 Water Supply 761.89 PRWSSIP-FDK-Div- Plan Civil Work and Post 15.06.201 Scheme 491.89 NCB 10.06.2011 01.03.2015 15.03.2015 07.04.2015 07.05.2015 21.05.2015 30.05.2015 - - - 15.06.2016 - - 362-I OHSR Review 5 Dhilwan Kalan PRWSSIP-FDK-Div- Plan Continous Sand Post 15.06.201 362-II Filtration Unit 279.00 NCB 14.05.2012 01.03.2015 15.03.2015 07.04.2015 07.05.2015 21.05.2015 30.05.2015 - - - 15.06.2016 - - including O&M Review 5 7 Water Supply 225.40 PRWSSIP-FDK-Div- Civil Work and 07.07.201 Plan Plan Post Scheme Basti 135.40 NCB 02.11.2014 22.04.2015 07.05.2015 16.05.2015 16.06.2015 30.06.2015 - - - - 07.07.2016 - - 363-I OHSR Review 5 Nanaksar PRWSSIP-FDK-Div- Continous Sand Sandhwan Post 07.07.201 363-II Filtration Unit 93.00 NCB 14.05.2012 22.04.2015 07.05.2015 16.05.2015 16.06.2015 30.06.2015 - - - - 07.07.2016 - - Review 5 including O&M 8 Water Supply 179.00 PRWSSIP-FDK-Div- Plan Scheme Behle Civil Work and Post 364-I 89.00 NCB 06.08.2013 15.06.2015 30.06.2015 10.07.2015 10.08.2015 25.08.2015 - 30.08.201 - - - 30.08.2016 - - Wala OHSR Review 5 PRWSSIP-FDK-Div- Plan Continous Sand Post 364-II Filtration Unit 93.00 NCB 14.05.2012 15.06.2015 30.06.2015 Review 10.07.2015 10.08.2015 25.08.2015 - 30.08.201 - - - 30.08.2016 - - including O&M 5 Performance Schemes 9 Improvement of PRWSSIP-FDK-Div- Plan Existing Water IMP-113-I Structure Repair of Post 06.08.201 Supply Scheme 20.00 Distribution System 20.00 NCB 15.06.2006 15.05.2015 30.05.2015 21.06.2015 21.07.2015 06.07.2015 - - - - 06.08.2016 - - and OHSR Review 5 Hardialeana 10 Improvement of PRWSSIP-FDK-Div- Plan Existing Water IMP-114-I Structure Repair of Post Supply Scheme 20.00 Distribution System 20.00 NCB 20.09.2010 22.05.2015 07.06.2015 Review 16.06.2015 16.07.2015 30.07.2015 - 07.08.201 - - - 07.05.2016 - - Wara Draka and OHSR 5 11 Improvement of PRWSSIP-FDK-Div- Plan Existing Water IMP-115-I Post Supply Scheme 20.00 Civil Work 20.00 NCB - 14.02.2015 21.03.2015 Review 07.03.2015 07.04.2015 07.05.2015 - 14.06.201 - - - 14.06.2016 - - Dal Singh Wala 5 Sewerage Scheme. 12 Small Bore 205.00 PRWSSIP-FDK-Div- Plan Sewerge SW-23-I Post Civil Work 205.00 NCB - 22.05.2015 07.06.2015 Review 16.06.2015 16.07.2015 30.07.2015 - 07.08.201 - - - 07.08.2016 - - Scheme 5 Gobindgarh District Muktsar Div. 1 Muktsar Water Supply Schemes PRWSSIP-MKST-Div- Civil Work and Post Plan 250.00 NCB 26.07.2013 01.03.2015 16.03.2015 25.03.2015 25.04.2015 10.05.2015 - 17.05.201 - - - 16.05.2016 - - Water Supply 365-I OHSR Review 1 325.00 5 Scheme Ghagga Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 1 325.00 Scheme Ghagga PRWSSIP-MKST-Div- Continous Sand Post Plan 75.00 NCB 26.07.2013 01.03.2015 16.03.2015 25.03.2015 25.04.2015 10.05.2015 - 17.05.201 - - - 16.05.2016 - - 365-II Filtration Unit Review 5 PRWSSIP-MKST-Div- Civil Work and Post Plan 366-I 385.00 NCB 26.07.2013 01.04.2015 16.04.2015 25.04.2015 25.05.2015 10.06.2015 - 17.06.201 - - - 16.06.2016 - - OHSR Review Water Supply 5 2 460.00 Scheme Gurusar PRWSSIP-MKST-Div- Continous Sand Post Plan 366-II 75.00 NCB 26.07.2013 01.04.2015 16.04.2015 25.04.2015 25.05.2015 10.06.2015 - 17.06.201 - - - 16.06.2016 - - Filtration Unit Review 5 PRWSSIP-MKST-Div- Civil Work and Post Plan 367-I 433.80 NCB 27.03.2013 08.03.2015 23.03.2015 02.04.2015 02.05.2015 17.05.2015 - 24.05.201 - - - 23.05.2016 - - OHSR Review Water Supply 5 3 583.80 Scheme Bhagsar PRWSSIP-MKST-Div- Continous Sand Post Plan 367-II 150.00 NCB 27.03.2013 08.03.2015 23.03.2015 02.04.2015 02.05.2015 17.05.2015 - 24.05.201 - - - 23.05.2016 - - Filtration Unit Review 5 PRWSSIP-MKST-Div- Civil Work and Post Plan 368-I 145.00 NCB 17.02.2014 22.03.2015 07.04.2015 16.04.2015 16.05.2015 30.05.2015 - 07.06.201 - - - 07.06.2016 - - Water Supply OHSR Review 5 4 Scheme Lande 200.00 Rode PRWSSIP-MKST-Div- Continous Sand Post Plan 368-II 55.00 NCB 17.02.2014 22.03.2015 07.04.2015 16.04.2015 16.05.2015 30.05.2015 - 07.06.201 - - - 07.06.2016 - - Filtration Unit Review 5 PRWSSIP-MKST-Div- Civil Work and Post Plan 369-I 178.44 NCB 27.03.2014 08.04.2015 23.04.2015 02.05.2015 02.06.2015 17.06.2015 - 24.06.201 - - - 23.06.2016 - - Water Supply OHSR Review 5 5 Scheme 253.44 Seerwali PRWSSIP-MKST-Div- Continous Sand Post Plan 369-II 75.00 NCB 27.03.2014 08.04.2015 23.04.2015 02.05.2015 02.06.2015 17.06.2015 - 24.06.201 - - - 23.06.2016 - - Filtration Unit Review 5 PRWSSIP-MKST-Div- Civil Work and Post Plan 370-I 230.00 NCB 06.08.2014 15.03.2015 31.03.2015 10.04.2015 10.05.2015 25.05.2015 - 31.05.201 - - - 31.05.2016 - - Water Supply OHSR Review 5 6 Scheme 305.00 Udekaran PRWSSIP-MKST-Div- Continous Sand Post Plan 370-II 75.00 NCB 06.08.2014 15.03.2015 31.03.2015 10.04.2015 10.05.2015 25.05.2015 - 31.05.201 - - - 31.05.2016 - - Filtration Unit Review 5 PRWSSIP-MKST-Div- Civil Work and Post Plan 371-I 189.31 NCB 06.08.2013 15.04.2015 30.04.2015 10.05.2015 10.06.2015 25.06.2015 - 30.06.201 - - - 30.06.2016 - - Water Supply OHSR Review 5 7 Scheme Sukhna 339.31 Ablu PRWSSIP-MKST-Div- Continous Sand Post Plan 371-II 150.00 NCB 06.08.2013 15.04.2015 30.04.2015 10.05.2015 10.06.2015 25.06.2015 - 30.06.201 - - - 30.06.2016 - - Filtration Unit Review 5 PRWSSIP-MKST-Div- Civil Work and Post Plan 372-I 240.50 NCB 02.01.2014 22.04.2015 07.05.2015 16.05.2015 16.06.2015 30.06.2015 - 07.07.201 - - - 07.07.2016 - - OHSR Review Water Supply 5 8 315.50 Scheme Mallan PRWSSIP-MKST-Div- Continous Sand Post Plan 372-II 75.00 NCB 02.01.2014 22.04.2015 07.05.2015 16.05.2015 16.06.2015 30.06.2015 - 07.07.201 - - - 07.07.2016 - - Filtration Unit Review 5 Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-MKST-Div- Civil Work and Post Plan 373-I 259.50 NCB 23.10.2013 29.04.2015 14.05.2015 23.05.2015 23.06.2015 07.07.2015 - 14.07.201 - - - 14.07.2016 - - Water Supply OHSR Review 5 9 Scheme 315.00 Tarkhanwala PRWSSIP-MKST-Div- Continous Sand Post Plan 373-II 55.00 NCB 23.10.2013 29.04.2015 14.05.2015 23.05.2015 23.06.2015 07.07.2015 - 14.07.201 - - - 14.07.2016 - - Filtration Unit Review 5 PRWSSIP-MKST-Div- Civil Work and Post Plan 374-I 286.55 NCB 28.10.2014 01.05.2015 16.05.2015 25.05.2015 25.06.2015 10.07.2015 - 17.07.201 - - - 16.07.2016 - - Water Supply OHSR Review 5 10 Scheme 370.44 Bhuttiwala PRWSSIP-MKST-Div- Continous Sand Post Plan 374-II 83.89 NCB 28.10.2014 01.05.2015 16.05.2015 25.05.2015 25.06.2015 10.07.2015 - 17.07.201 - - - 16.07.2016 - - Filtration Unit Review 5 PRWSSIP-MKST-Div- Civil Work and Post Plan 375-I 251.51 NCB 08.08.2014 08.05.2015 23.05.2015 02.06.2015 02.07.2015 17.07.2015 - 24.07.201 - - - 23.07.2016 - - Water Supply OHSR Review 5 11 Scheme Guri 335.40 Sangar PRWSSIP-MKST-Div- Continous Sand Post Plan 375-II 83.89 NCB 08.08.2014 08.05.2015 23.05.2015 02.06.2015 02.07.2015 17.07.2015 - 24.07.201 - - - 23.07.2016 - - Filtration Unit Review 5 Water Supply PRWSSIP-MKST-Div- Distribution System Post Plan 12 Scheme Khunan 70.81 376-I 68.11 NCB 27.08.2014 15.05.2015 30.05.2015 10.06.2015 10.07.2015 25.07.2015 - 30.07.201 - - - 30.04.2016 - - and OHSR Review Khurd 5 Water Supply PRWSSIP-MKST-Div- Distribution System Post Plan 13 Scheme Assa 55.00 376-II 55.00 NCB 27.08.2014 15.05.2015 30.05.2015 10.06.2015 10.07.2015 25.07.2015 - 30.07.201 - - - 30.04.2016 - - and other works Review Butter 5 Performance Schemes Improvement of PRWSSIP-MKST-Div- Existing Water IMP-116-I Post Plan 14 20.00 OHSR 24.63 NCB 20.09.2010 22.05.2015 07.06.2015 16.06.2015 16.07.2015 30.07.2015 - 07.08.201 - - - 07.05.2016 - - Supply Scheme Review Budimal 5 Improvement of PRWSSIP-MKST-Div- Existing Water IMP-117-I Post Plan 15 20.00 Civil Work 19.50 NCB - 29.01.2015 14.02.2015 23.02.2015 23.03.2015 07.04.2015 - 14.05.201 - - - 14.09.2015 - - Supply Scheme Review Doda 5 Improvement of PRWSSIP-MKST-Div- Existing Water IMP-118-I Post Plan 16 19.72 Civil Work 19.15 NCB - 29.01.2015 14.02.2015 23.02.2015 23.03.2015 07.04.2015 - 14.05.201 - - - 14.09.2015 - - Supply Scheme Review Khunan Kalan 5 Improvement of PRWSSIP-MKST-Div- Existing Water IMP-119-I Post Plan 17 15.00 Civil Work 14.72 NCB - 29.01.2015 14.02.2015 23.02.2015 23.03.2015 07.04.2015 - 14.05.201 - - - 14.09.2015 - - Supply Scheme Review Chibranwali 5 Sewerage Scheme. Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Small Bore PRWSSIP-MKST-Div- SW-24-I Post Plan 18 Sewerge 606.00 Civil Work 587.00 NCB - 22.05.2015 07.06.2015 Review 16.06.2015 16.07.2015 30.07.2015 - 07.08.201 - - - 07.08.2016 - - Scheme Smagh 5 PRWSSIP-MKST-Div- Small Bore Sewerge SW-25-I Post Plan 19 650.00 Civil Work 630.50 NCB - 22.06.2015 07.07.2015 16.07.2015 16.08.2015 30.08.2015 - 07.09.201 - - - 07.09.2016 - - Scheme Madhar Review Kalan 5 Div. Malout Water Supply Schemes 1 Bhullar Wala 140.00 PRWSSIP-Malout- Civil Work, Div-377-I OHSR, Distribution Post Plan System, Pumping 50.00 NCB 01.01.2015 01.03.2015 16.03.2015 Review 25.03.2015 25.04.2015 10.05.2015 17.05.2015 16.05.2016 Machinary and other Works PRWSSIP-Malout- Continuous Post Plan Div-377-II Sand Filtration 90.00 NCB 01.01.2015 01.03.2015 16.03.2015 Review 25.03.2015 25.04.2015 10.05.2015 17.05.2015 16.05.2016 plant Civil Work, 2 Middu Khera 172.00 PRWSSIP-Malout- OHSR, Distribution Div-378-I Post Plan System, Pumping 82.00 NCB 01.01.2015 01.03.2015 20.03.2015 Review 31.03.2015 30.04.2015 15.05.2015 - 25.05.2015 31.05.2016 Machinary and other Works PRWSSIP-Malout- Continuous Post Plan Div-378-II Sand Filtration 90.00 NCB 01.01.2015 01.03.2015 20.03.2015 Review 31.03.2015 30.04.2015 15.05.2015 - 25.05.2015 31.05.2016 plant 3 Adhainan 214.00 PRWSSIP-Malout- Civil Work, Div-379-I OHSR, Distribution Post Plan System, Pumping 124.00 NCB 01.01.2015 01.03.2015 20.03.2015 Review 31.03.2015 30.04.2015 15.05.2015 - 25.05.2015 31.05.2016 Machinary and other Works PRWSSIP-Malout- Continuous Post Plan Div-379-II Sand Filtration 90.00 NCB 01.01.2015 01.03.2015 20.03.2015 Review 31.03.2015 30.04.2015 15.05.2015 - 25.05.2015 31.05.2016 plant 4 Sehna Khera 122.00 PRWSSIP-Malout- Civil Work, Div-380-I OHSR, Distribution Post Plan System, Pumping 32.00 NCB 01.01.2015 01.03.2015 20.03.2015 Review 31.03.2015 30.04.2015 15.05.2015 - 25.05.2015 31.05.2016 Machinary and other Works PRWSSIP-Malout- Continuous Post Plan Div-380-II Sand Filtration 90.00 NCB 01.01.2015 01.03.2015 20.03.2015 Review 31.03.2015 30.04.2015 15.05.2015 - 25.05.2015 31.05.2016 plant Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 5 Khudian Gulab 258.00 PRWSSIP-Malout- Civil Work, Singh Div-381-I OHSR, Distribution /Mahan Singh Post Plan System, Pumping 168.00 NCB 01.02.2015 01.04.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 Machinary and other Works PRWSSIP-Malout- Continuous Post Plan Div-381-II Sand Filtration 90.00 NCB 01.02.2015 01.04.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 plant 6 Badal (New) 122.00 PRWSSIP-Malout- Civil Work, Div-382-I OHSR, Distribution Post Plan System, Pumping 32.00 NCB 01.02.2015 01.04.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 Machinary and other Works PRWSSIP-Malout- Continuous Post Plan Div-382-II Sand Filtration 90.00 NCB 01.02.2015 01.04.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 plant 7 Dabwali Dhab 155.00 PRWSSIP-Malout- Civil Work, Div-383-I OHSR, Distribution Post Plan System, Pumping 65.00 NCB 01.02.2015 01.04.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 Machinary and other Works PRWSSIP-Malout- Continuous Post Plan Div-383-II Sand Filtration 90.00 NCB 01.02.2015 01.04.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 plant 8 Kangan Khera 100.00 PRWSSIP-Malout- Civil Work, Div-384-I OHSR, Distribution Post Plan System, Pumping 30.00 NCB 01.02.2015 01.04.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 Machinary and other Works PRWSSIP-Malout- Continuous Post Plan Div-384-II Sand Filtration 70.00 NCB 01.02.2015 01.04.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 plant 9 Jhorar 304.94 PRWSSIP-Malout- Civil Work, Div-385-I Distribution Post Plan System, Pumping 304.94 NCB 01.02.2015 01.04.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 Machinary and other Works 10 Katore wala 247.00 PRWSSIP-Malout- Civil Work, Div-386-I OHSR, Distribution Post Plan System, Pumping 192.00 NCB 01.03.2015 01.05.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 Machinary and other Works PRWSSIP-Malout- Continuous Post Plan Div-386-II Sand Filtration 55.00 NCB 01.03.2015 01.05.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 plant Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 11 Kotbhai 806.87 PRWSSIP-Malout- Civil Work, Div-387-I OHSR, Distribution Post Plan System, Pumping 656.87 NCB 01.03.2015 01.05.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 Machinary and other Works PRWSSIP-Malout- Continuous Post Plan Div-387-II Sand Filtration 150.00 NCB 01.03.2015 01.05.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 plant 12 Doula Dhanies 158.55 PRWSSIP-Malout- Civil Work, Div-388-I Distribution Post Plan System, Pumping 123.55 NCB 01.03.2015 01.05.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 Machinary and other Works PRWSSIP-Malout- RCC Structure & Post Plan 35.00 NCB 01.03.2015 01.05.2015 25.06.2015 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 Div-388-II OHSR Review 13 Husnar 559.13 PRWSSIP-Malout- Civil Work, Div-389-I OHSR, Distribution Post Plan System, Pumping 419.13 NCB 01.03.2015 01.05.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 Machinary and other Works PRWSSIP-Malout- Continuous Post Plan Div-389-II Sand Filtration 140.00 NCB 01.03.2015 01.05.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 plant 14 Peori 300.00 PRWSSIP-Malout- Civil Work, Div-390-I OHSR, Distribution Post Plan System, Pumping 210.00 NCB 01.04.2015 01.06.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 Machinary and other Works PRWSSIP-Malout- Continuous Post Plan Div-390-II Sand Filtration 90.00 NCB 01.04.2015 01.06.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 plant 15 Ram Nagar 112.97 PRWSSIP-Malout- Civil Work, Div-391-I Distribution Post Plan System, Pumping 82.92 NCB 01.04.2015 01.06.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 Machinary and other Works PRWSSIP-Malout- RCC Structure & Post Plan 30.00 NCB 01.04.2015 01.06.2015 25.06.2015 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 Div-391-II OHSR Review 16 Sheikh 110.00 PRWSSIP-Malout- Civil Work, Div-392-I OHSR, Distribution Post Plan System, Pumping 70.00 NCB 01.04.2015 01.06.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 Machinary and other Works PRWSSIP-Malout- Post Plan CTP & OHSR 40.00 NCB 01.04.2015 01.06.2015 25.06.2015 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 Div-392-II Review Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 17 Madhir 300 PRWSSIP-Malout- Civil Work, Div-393-I OHSR, Distribution Post Plan System, Pumping 180.00 NCB 01.05.2015 01.07.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 Machinary and other Works PRWSSIP-Malout- Continuous Post Plan Div-393-II Sand Filtration 120.00 NCB 01.05.2015 01.07.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 plant 18 Badian 194.00 PRWSSIP-Malout- Civil Work, Div-394-I OHSR, Distribution Post Plan System, Pumping 104.00 NCB 01.05.2015 01.07.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 Machinary and other Works PRWSSIP-Malout- Continuous Post Plan Div-394-II Sand Filtration 90.00 NCB 01.05.2015 01.07.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 plant 19 Babanian 110.00 PRWSSIP-Malout- Civil Work, Div-395-I OHSR, Distribution Post Plan System, Pumping 50.00 NCB 01.05.2015 01.07.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 Machinary and other Works PRWSSIP-Malout- Continuous Post Plan Div-395-II Sand Filtration 60.00 NCB 01.05.2015 01.07.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 plant 20 Village Malout 641.00 PRWSSIP-Malout- Civil Work, Div-396-I OHSR, Distribution Post Plan System, Pumping 461.00 NCB 01.06.2015 01.08.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 Machinary and other Works PRWSSIP-Malout- Continuous Post Plan Div-396-II Sand Filtration 180.00 NCB 01.06.2015 01.08.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 plant 21 Dabwali Malko 50.00 PRWSSIP-Malout- Civil Work, Div-397-I Inlet Channal, Distribution Post Plan 50.00 NCB 01.02.2015 01.04.2015 25.06.2015 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 System, Pumping Review Machinary and other Works Performance Schemes 22 Lal Bhai 20.00 PRWSSIP-Malout- Making house Post Plan Div-IMP-120-I connection & laying 20.00 NCB 01.02.2015 01.04.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 of pipe line Sewerage Scheme. Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 23 Mann 500.00 PRWSSIP-Malout- Civil Work, Div-SW-25-I STP, Pumping Post Plan Machinary, Sewer 500.00 NCB 01.06.2015 01.08.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 line Net work and other Works 24 Mehmood 500.00 PRWSSIP-Malout- Civil Work, Khera Div-SW-26-I STP, Pumping Post Plan Machinary, Sewer 500.00 NCB 01.06.2015 01.08.2015 25.06.2015 Review 06.06.2015 05.07.2015 15.07.2015 - 25.07.2015 31.03.2016 line Net work and other Works District Moga Division Moga Water Supply Schemes 1 Water Supply 40.00 PRWSSIP-Moga-Div- Civil Work and 40.00 NCB 31.01.2015 28.02.2015 15.03.2015 20.03.2015 25.04.2015 15.05.2015 - - - - 20.11.2015 - - Plan Post Scheme 398-I Dist. System 20.05.201 Review Manjhali 5 2 Water Supply 70.00 PRWSSIP-Moga-Div- OHSR, Civil Work 70.00 NCB 31.01.2015 28.02.2015 15.03.2015 20.03.2015 25.04.2015 15.05.2015 - - - - 20.12.2015 - - Plan Post Scheme Datte 399-I and Dist. System 20.05.201 Review Wal 5 3 Water Supply 150.00 PRWSSIP-Moga-Div- OHSR, Civil Work 150.00 NCB 31.01.2015 28.02.2015 15.03.2015 20.03.2015 25.04.2015 15.05.2015 - - - - 20.12.2015 - - Plan Scheme 400-I and Dist. System Post 20.05.201 Fatehgarh Review 5 Korotana 4 Water Supply 30.00 PRWSSIP-Moga-Div- Civil Work and 30.00 NCB 31.01.2015 28.02.2015 15.03.2015 20.03.2015 25.04.2015 15.05.2015 - - - - 20.11.2015 - - Plan Post Scheme Roshan 401-I Dist. System 20.05.201 Review Wala 5 5 Water Supply 70.00 PRWSSIP-Moga-Div- OHSR, Civil Work 70.00 NCB 15.02.2015 15.03.2015 31.03.2015 05.04.2015 10.05.2015 31.05.2015 - 05.06.201 - - - 05.01.2016 - - Plan Scheme Pandori 402-I and Dist. System Post 5 Aariyan Review 6 Water Supply 60.00 PRWSSIP-Moga-Div- OHSR, Civil Work 60.00 NCB 15.02.2015 15.03.2015 31.03.2015 05.04.2015 10.05.2015 31.05.2015 - 05.06.201 - - - 05.01.2016 - - Plan Scheme Kishan 403-I and Dist. System 5 Post Pura and Shadi Review Wala 7 Water Supply 55.00 PRWSSIP-Moga-Div- Civil Work and 55.00 NCB 15.02.2015 15.03.2015 31.03.2015 05.04.2015 10.05.2015 31.05.2015 - 05.06.201 - - - 05.12.2015 - - Plan Post Scheme Harie 404-I Dist. System Review 5 Wala 8 Water Supply 210.00 PRWSSIP-Moga-Div- OHSR, Civil Work 210.00 NCB 15.02.2015 15.03.2015 31.03.2015 05.04.2015 10.05.2015 31.05.2015 - 05.06.201 - - - 05.01.2016 - - Plan Post Scheme Small 405-I and Dist. System 5 Review Sar 9 Water Supply 165.00 PRWSSIP-Moga-Div- OHSR, Civil Work 210.00 NCB 28.02.2015 31.03.2015 15.04.2015 20.04.2015 25.04.2015 15.06.2015 - 20.06.201 - - - 20.01.2016 - - Plan Scheme Droli 406-I and Dist. System Post 5 Bhai Review Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 10 Water Supply 60.00 PRWSSIP-Moga-Div- OHSR, Civil Work 60.00 NCB 28.02.2015 31.03.2015 15.04.2015 20.04.2015 25.04.2015 15.06.2015 - 20.06.201 - - - 20.01.2016 - - Plan Scheme Kore 407-I and Dist. System Post 5 Wala Khurd Review 11 Water Supply 155.00 PRWSSIP-Moga-Div- OHSR, Civil Work 155.00 NCB 28.02.2015 31.03.2015 15.04.2015 20.04.2015 25.04.2015 15.06.2015 - 20.06.201 - - - 20.01.2016 - - Plan Scheme Bilas 408-I and Dist. System Post 5 Pur Review 12 Water Supply 120.00 PRWSSIP-Moga-Div- OHSR, Civil Work 120.00 NCB 28.02.2015 31.03.2015 15.04.2015 20.04.2015 25.04.2015 15.06.2015 - 20.06.201 - - - 20.01.2016 - - Plan Scheme Takhtu 409-I and Dist. System Post 5 Pura Review Performance Schemes 1 Water Supply 10.00 PRWSSIP-Moga-Div- Civil Work and 10.00 NCB 31.01.2015 28.02.2015 15.03.2015 20.03.2015 31.03.2015 15.04.2015 - - - - 20.06.2015 - - Plan Post Scheme Khosa IMP-121-I Dist. System 20.04.201 Review Pando 5 2 Water Supply 5.00 PRWSSIP-Moga-Div- Civil Work and 5.00 NCB 31.01.2015 28.02.2015 15.03.2015 20.03.2015 31.03.2015 15.04.2015 - - - - 20.06.2015 - - Plan Post Scheme Bhagi IMP-122-I Dist. System 20.04.201 Review Ke 5 3 Water Supply 14.00 PRWSSIP-Moga-Div- Civil Work and 15.00 NCB 31.01.2015 28.02.2015 15.03.2015 20.03.2015 31.03.2015 15.04.2015 - - - - 20.06.2015 - - Plan Post Scheme Mundi IMP-123-I Dist. System 20.04.201 Review Jamal 5 4 Water Supply 15.00 PRWSSIP-Moga-Div- Civil Work and 15.00 NCB 31.01.2015 28.02.2015 15.03.2015 20.03.2015 31.03.2015 15.04.2015 - - - - 20.06.2015 - - Plan Scheme Dharam IMP-124-I Dist. System 20.04.201 Post Singh Wala 5 Review Sewerage Scheme. 1 Sewerage 350.00 PRWSSIP-Moga-Div- Pipe Sewer, Disposal 350.00 NCB 31.01.2015 28.02.2015 15.03.2015 20.03.2015 25.04.2015 15.05.2015 - - - - 20.02.2016 - - Plan Work, Pumping Scheme Baddu SW-27-I 20.05.201 Station, Site Wal Development at STP Post 5 Review site Sludge disposal and environment Surfact water supply to villages of Moga 1 SURFACE 23,900 PRWSSIP-Moga-Div- PROVIDING NCB NCB DONE 15-Feb-15 31-Mar-16 15.04.2015 20/04/15 31/05/15 15/07/15 25.07.2015 1-Aug-15 - - - 31-04-17 - - Plan WATER SUPPLY 410-I SURFACE WATER TO 85 VILLAGES OF BLOCK- SUPPLY TO 85 NIHALSINGHWAL QUALITY AFFECTED A AND VILLAGES OF BLOCK BAGHAPURANA NIHALSINGHWALA OF DISTRICT MOGA AND BAGHAPURANA Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Circle Ferozepur District Fazilka Div. Fazilka 1 Water Supply 252.00 PRWSSIP-FZK-Div- Civil Work, Plan Scheme 411-I OHSR, Distribution Post 01.06.201 Chowarian Wali System, Pumping 172.00 NCB 1/31/2015 2/28/2015 3/30/2015 16.04.2015 16.05.2015 31.05.2015 - - - - 31.03.2016 - - Machinary and Review 5 (Canal Based) other Works PRWSSIP-FZK-Div- Plan Continous Sand Post 01.06.201 411-II Filtration Unit 80.00 NCB 1/31/2015 2/28/2015 3/30/2015 16.04.2015 16.05.2015 31.05.2015 - - - - 31.03.2016 - - including O&M Review 5 2 Water Supply 290.00 PRWSSIP-FZK-Div- Plan Civil Work, Scheme 412-I OHSR, Distribution Koharian Wali Post 01.06.201 System, Pumping 197.00 NCB 1/31/2015 2/28/2015 3/30/2015 16.04.2015 16.05.2015 31.05.2015 - - - - 31.03.2016 - - (Canal Based) Review 5 Machinary and other Works PRWSSIP-FZK-Div- Plan Continous Sand 412-II Post 01.06.201 Filtration Unit 93.00 NCB 1/31/2015 2/28/2015 3/30/2015 16.04.2015 16.05.2015 31.05.2015 - - - - 31.03.2016 - - including O&M Review 5 3 Water Supply 230.00 PRWSSIP-FZK-Div- Plan Civil Work, Scheme Kerian 413-I OHSR, Distribution (Canal Based) Post 01.06.201 System, Pumping 150.00 NCB 1/31/2015 2/28/2015 3/30/2015 16.04.2015 16.05.2015 31.05.2015 - - - - 31.03.2016 - - Machinary and Review 5 other Works PRWSSIP-FZK-Div- Continous Sand Plan Post 01.06.201 413-II Filtration Unit 80.00 NCB 1/31/2015 2/28/2015 3/30/2015 16.04.2015 16.05.2015 31.05.2015 - - - - 31.03.2016 - - Review 5 including O&M 4 Water Supply 242.00 PRWSSIP-FZK-Div- Plan Civil Work, Scheme Ladhu 414-I OHSR, Distribution Wala Uttar Post 01.06.201 System, Pumping 162.00 NCB 1/31/2015 2/28/2015 3/30/2015 16.04.2015 16.05.2015 31.05.2015 - - - - 31.03.2016 - - (Canal Based) Review 5 Machinary and other Works PRWSSIP-FZK-Div- Plan Continous Sand Post 01.06.201 414-II Filtration Unit 80.00 NCB 1/31/2015 2/28/2015 3/30/2015 16.04.2015 16.05.2015 31.05.2015 - - - - 31.03.2016 - - including O&M Review 5 5 Water Supply 195.00 PRWSSIP-FZK-Div- Civil Work, 30.05.2015 Plan Scheme 415-I OHSR, Dhippan Wali Distribution Post 15.06.201 (Canal Based) 102.00 NCB 2/17/2015 3/22/2015 4/7/2015 16.04.2015 16.05.2015 - - - - 15.06.2016 - - System, Pumping Review 5 Machinary and other Works Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-FZK-Div- Continous Sand 30.05.2015 Plan Post 15.06.201 415-II Filtration Unit 93.00 NCB 2/17/2015 3/22/2015 4/7/2015 16.04.2015 16.05.2015 - - - - 15.06.2016 - - Review 5 including O&M 6 Water Supply 185.00 PRWSSIP-FZK-Div- Civil Work, 30.05.2015 Plan Scheme Mandi 416-I OHSR, Amean Ganj Distribution 15.06.201 Post (Canal Based) 105.00 NCB 2/17/2015 3/22/2015 4/7/2015 16.04.2015 16.05.2015 - - - - 15.06.2016 - - System, Pumping Review 5 Machinary and other Works PRWSSIP-FZK-Div- 30.05.2015 Plan Continous Sand Post 15.06.201 416-II Filtration Unit 80.00 NCB 2/17/2015 3/22/2015 4/7/2015 16.04.2015 16.05.2015 - - - - 15.06.2016 - - including O&M Review 5 7 Water Supply 220.00 PRWSSIP-FZK-Div- Plan Civil Work, Scheme Halim 417-I OHSR, Distribution Wala Mandi Post 02.07.201 System, Pumping 127.00 NCB 01.03.2015 08.04.2015 23.04.2015 02.05.2015 02.06.2015 17.06.2015 - - - - 02.07.2016 - - Roran Wali Machinary and Review 5 (Canal Based) other Works PRWSSIP-FZK-Div- Continous Sand Plan Post 02.07.201 417-II Filtration Unit 93.00 NCB 01.03.2015 08.04.2015 23.04.2015 02.05.2015 02.06.2015 17.06.2015 - - - - 02.07.2016 - - Review 5 including O&M 8 Water Supply 283.00 PRWSSIP-FZK-Div- Plan Scheme Jhottian Civil Work, 418-I Wali OHSR, Distribution Post 02.07.201 (Canal Based) System, Pumping 190.00 NCB 01.03.2015 08.04.2015 23.04.2015 02.05.2015 02.06.2015 17.06.2015 - - - - 02.07.2016 - - Machinary and Review 5 other Works PRWSSIP-FZK-Div- Plan Continous Sand Post 02.07.201 418-II Filtration Unit 93.00 NCB 01.03.2015 08.04.2015 23.04.2015 02.05.2015 02.06.2015 17.06.2015 - - - - 02.07.2016 - - including O&M Review 5 9 Water Supply 265.00 PRWSSIP-FZK-Div- Plan Civil Work, Scheme 419-I OHSR, Distribution Sohangarh Urf Post 02.07.201 System, Pumping 172.00 NCB 01.03.2015 08.04.2015 23.04.2015 02.05.2015 02.06.2015 17.06.2015 - - - - 02.07.2016 - - Ratte Wala Machinary and Review 5 (Canal Based) other Works PRWSSIP-FZK-Div- Plan Continous Sand Post 02.07.201 419-II Filtration Unit 93.00 NCB 01.03.2015 08.04.2015 23.04.2015 02.05.2015 02.06.2015 17.06.2015 - - - - 02.07.2016 - - including O&M Review 5 10 Water Supply 150.00 PRWSSIP-FZK-Div- Tubewell, Scheme Awa Urf 420-I Civil Work, Wariyam Pura OHSR, Distribution Post 02.08.201 Plan (Tubewell 150.00 NCB 01.04.2015 08.05.2015 23.05.2015 02.06.2015 02.07.2015 17.07.2015 - - - - 02.05.2016 - - Systm, Pumping Review 5 Based) Machinary and other Works Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 11 Water Supply 130.00 PRWSSIP-FZK-Div- Scheme Wasal Tubewell, 421-I Mohan Ke Civil Work, OHSR, Distribution Post 02.08.201 Plan (Tubewell 130.00 NCB 01.04.2015 08.05.2015 23.05.2015 02.06.2015 02.07.2015 17.07.2015 - - - - 02.05.2016 - - Based) Systm, Pumping Review 5 Machinary and other Works 12 Water Supply 125.00 PRWSSIP-FZK-Div- Tubewell, SchemeCh. 422-I Civil Work, Mabio Hardo OHSR, Dhandi Post 02.08.201 Plan Distribution 125.00 NCB 01.04.2015 08.05.2015 23.05.2015 02.06.2015 02.07.2015 17.07.2015 - - - - 02.05.2016 - - (Tubewell Review 5 Systm, Pumping Based) Machinary and other Works 13 Water Supply 165.00 PRWSSIP-FZK-Div- Tubewell, Scheme Gulam 423-I Civil Work, Rasul Wala OHSR, (Tubewell Post 02.08.201 Plan Distribution 165.00 NCB 01.04.2015 08.05.2015 23.05.2015 02.06.2015 02.07.2015 17.07.2015 - - - - 02.05.2016 - - Based) Review 5 Systm, Pumping Machinary and other Works 14 Water Supply 143.00 PRWSSIP-FZK-Div- Tubewell, Scheme Kahne 424-I Civil Work, Wala OHSR, (Tubewell Post 02.08.201 Plan Distribution 143.00 NCB 01.04.2015 08.05.2015 23.05.2015 02.06.2015 02.07.2015 17.07.2015 - - - - 02.05.2016 - - Based) Review 5 Systm, Pumping Machinary and other Works 15 Improvement of 30.00 PRWSSIP-FZK-Div- Plan Water Supply IMP-125-I Structure Repair & Scheme Ch. Arni Post 25.06.201 Distribution 30.00 NCB - 31.03.2015 15.04.2015 25.04.2015 25.05.2015 10.06.2015 - - - - 31.12.2015 - - Wala Review 5 System 16 Small Bore 650.00 1 Plan Sewerge Post 02.07.201 Scheme Ch. Civil Work 650.00 NCB 01.03.2015 08.04.2015 23.04.2015 02.05.2015 02.06.2015 17.06.2015 - - - - 02.07.2016 - - Review 5 Singhe Wala Division no. 1,Ferozepur 1 Nizam Wala 57.10 PRWSSIP-FZR-Div- Plan Tubwell, Civil Post 25.08.201 425-I 55.60 NCB 20.03.2015 15.05.2015 05.06.2015 25.06.2015 27.07.2015 10.08.2015 - - - - 25.02.2016 - - Work and OHSR Review 5 2 Bhamba Singh 49.05 PRWSSIP-FZR-Div- Plan Wala 426-I Tubwell, Civil Post 15.09.201 47.55 NCB 15.04.2015 15.06.2015 30.06.2015 15.07.2015 20.08.2015 30.08.2015 - - - - 15.03.2016 - - Work and OHSR Review 5 Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 3 Lakhmir Ke 53.05 PRWSSIP-FZR-Div- Plan Tubwell, Civil Post 25.09.201 hitha 427-I 51.55 NCB 30.04.2015 25.06.2015 10.07.2015 25.07.2015 30.08.2015 15.09.2015 - - - - 25.03.2016 - - Work and OHSR Review 5 4 Ch. Mubian 53.45 PRWSSIP-FZR-Div- Plan Hardo Dhandi 428-I Tubwell, Civil Post 28.05.201 51.95 NCB 28.2.2015 1.5.2015 20.05.2015 15.06.2015 20.07.2015 30.07.2015 - - - - 25.02.205 - - Work and OHSR Review 5 5 Improvement 11.66 PRWSSIP-FZR-Div- Plan of Existing 429-I Tubewell & Civil Post 16.11.201 10.16 NCB 15.07.2015 05.08.2015 28.08.2015 12.08.2015 10.10.2015 25.11.2015 - - - - 28.02.2016 - - Water Supply Work Review 5 Schem Khai WSS No.-2, Ferozepur 1 Mansoor Deva 115.68 PRWSSIP-FZR-Div- Plan Tubewell, Civil Post 25.06.201 430-I 115.68 NCB 01.02.2015 01.04.2015 16.04.2015 25.04.2015 25.05.2015 10.06.2015 - - - - 25.06.2016 - - Work and OHSR Review 5 2 Pir 97.08 PRWSSIP-FZR-Div- Plan Tubewell, Civil Post 25.06.201 Mohhamad 431-I 97.08 NCB 01.02.2015 01.04.2015 16.04.2015 25.04.2015 25.05.2015 10.06.2015 - - - - 25.06.2016 - - Work and OHSR Review 5 3 Bazidpur 210.16 PRWSSIP-FZR-Div- Tubewell, Civil 210.16 NCB 01.03.2015 18.04.2015 23.04.2015 02.05.2015 02.06.2015 17.06.2015 - 02.07.201 - - - 02.07.2016 - - Plan Post 432-I Work and OHSR 5 Review Division .Abohar 1 Narain Pura PRWSSIP-Abohar- Civil works & Post 30/06/20 Bifurcated from 183.94 NCB 22/12/2014 31/03/2015 15/4/2015 20/04/2015 20/05/2015 15/06/2015 - - - - 20/6/2016 - - Div-433-I OHSR Review 15 Existing Water PRWSSIP-Abohar- Continuous sand Supply Scheme Plan 253.93 Div-433-II filter plant having Ram Pura Post 30/06/20 Narain Pura, capacity of 70.00 NCB 22/12/2014 31/03/2015 15/4/2015 20/04/2015 20/05/2015 15/06/2015 - - - - 20/6/2016 - - Review 15 Block-Abohar 50m3 per hour 2 Aug. W/S PRWSSIP-Abohar- Civil works & Post 30/06/20 234.37 NCB 26/12/2014 31/03/2015 15/4/2015 20/04/2015 20/05/2015 15/06/2015 - - - - 20/6/2016 - - Scheme Rai Div-434-I OHSR Review 15 Pura, Block - PRWSSIP-Abohar- Continuous sand Plan Abohar 324.37 Div-434-II filter plant having Post 30/06/20 capacity of 90.00 NCB 26/12/2014 31/03/2015 15/4/2015 20/04/2015 20/05/2015 15/06/2015 - - - - 20/6/2016 - - Review 15 60m3 per hour 3 Aug. W/S PRWSSIP-Abohar- Civil works & Post 20/8/201 171.91 NCB 29/1/2015 29/5/2015 15/6/2015 19/06/2015 20/07/2015 30/07/2015 - - - - 20/8/2016 - - Scheme Div-435-I OHSR Review 5 Panjawa Block- PRWSSIP-Abohar- Plan 241.91 Continuous sand Khuian Sarwar Div-435-II Post 20/8/201 filter plant 70.00 NCB 29/1/2015 29/5/2015 15/6/2015 19/06/2015 20/07/2015 30/07/2015 - - - - 20/8/2016 - - Review 5 Estimated cost (Package) (RS lacs) bid Document (in case Package No. Date of Completion as Banks no objection to (Date/Value/Currency) Design Investigatiion Preparation/Sanction Expenditure incurred Name of Contractor Banks no objection contract award (in Completed (Date) of bid Document DSR Sacntioned Contarct signed Contract Award decided (Date) Actual Date of Plan/Actual Bids Procurement Planned Contract No. per contract Completion Method of WBR No. Cost/ case of to date (Date) (Date) Sr. Name of Description of (in case of Admin. No. Scheme Works prior Invitation App. Cost Open on (Date) (Date) review) (In Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 4 Aug. W/S PRWSSIP-Abohar- Civil works & Post 20/8/201 186.20 NCB 29/1/2015 29/5/2015 15/6/2015 19/06/2015 20/07/2015 30/07/2015 - - - - 20/8/2016 - - Scheme Patti Div-436-I OHSR Review 5 Plan 256.20 Billa Block- PRWSSIP-Abohar- Continuous sand Post 20/8/201 70.00 NCB 29/1/2015 29/5/2015 15/6/2015 19/06/2015 20/07/2015 30/07/2015 - - - - 20/8/2016 - - Khuian Sarwar Div-436-II filter plant Review 5 Note: The Package no. in Procurement Plan of proposed PRWSSI Programme has been generated Manually on excell sheet, which may differ when pkg. no. would be generated through MIS system, but package no. will be uniquely identified. Department of Water Supply and Sanitation, Punjab Website: www.pbdwss.gov.in Procurement report Procurement Plan for Goods Contract Status 'All' bid Document (in case Document/ RFQ (Date) Date of Completion as Banks no objection to Expenditure incurred Supply order issued Estimated cost (RS Supplier/Contractor Banks no objection Supply order No. & contract award (in Preparation of bid (Value/Currency) Contract Award decided (Date) Actual Date of Bids Procurement per contract Completion Plan/Actual Method of WBR No. Name of case of to date lacs) Date Sr. Procure-ment (in case of Description of Goods No. Plan Package No. prior Invitation Open on (Date) (Date) review) Head Office 1 Proc/HOD/ Computers (PC), 50 NCB 30.7.15 N/A 15.8.15 30.8.15 15.9.15 N/A 18.9.15 -- -- -- 18.10.15 -- -- Plan Goods/1 Printers, accessories & (50/ INR) Laptops) Actual 2 Proc/HOD/ Water Cooler and 6 NS 15.8.15 N/A 30.8.15 15.9.15 30.9.15 N/A 3.10.15 -- -- -- 3.11.15 -- -- Plan Goods/2 Purifier (No. of Units-2, (6/INR) Unit cost-3.00) Actual 3 Proc/HOD/ Vehicle (No. of units-6, 36 NCB/ 1.7.15 N/A 15.08.15 15.09.15 15.10.16 N/A 18.10.16 -- -- -- 30.10.16 -- -- Plan Goods/3 Unit cost 6.00) DGS&D Actual 4 Proc/Division/ Vehicle (No. of units-15, 90 NCB/ 1.7.15 N/A 15.08.15 15.09.15 15.10.16 N/A 18.10.16 -- -- -- 30.10.16 -- -- Plan Goods/4 Unit cost 6.00) DGS&D Actual Department of Water Supply & Sanitation, Punjab Procurement Plan For Consultancy Contract Status: ty & Zip Code. If USA Advertising for short Last date Proposal (Technical) Consultant/Nationali Method of Selection Estimated Cost (RS Bank's NOC to RFP Contract Numbers, Bank's NOC (Date) Completed (Date) incurred to date Contract Award of Receipt Services to be TOR Finalised Bank NOC to Bank NOC to listing (Date) Expenditure Plan/Actual Value(Lac) of Name of RFP (Date) (Date) (Date) Lacs) Sr. Package Proposal WBR Description of Services Issued No. No. (Technical/ No. (Date) Financial/ Combined) (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PRWSS-C- Preparation of DSR of Water 31-10- 15-01- 1 SPMC-3168- P 250.00 QCBS 01-10-2014 8-10-2014 18-11-2014 26-12-2014 N/A N/A 20-01-2017 N/A 0 Supply scheme in PRWSS-II 2014 2015 1 AAR VEE Associats PRWSS-C- Preparation of DSR of Water 31-10- 16.01.20 Architects Engr. & 2 SPMC-3168- A SUpply Schemes for PRWSS- 250.00 QCBS 31-10-2014 7-10-2014 21.11.2014 29.12.2014 14.02.2015 INR 3,95,80,500 03.03.2017 2014 15 Consultants Pvt. Ltd. 1 II Hyderabad PRWSS-C- Enhancement of existing MIS 26-12- 22-01- 3 SPMC-3172- P of DWSS with development of 385.00 QCBS 01-12-2014 6-12-2014 29-12-2014 15-01-2015 N/A N/A 30-10-2020 N/A 0 2014 2015 1 new mobile based module PRWSS-C- Enhancement of existing MIS 4 SPMC-3172- A of DWSS with development of 375.00 QCBS 30-10-2014 13-12-2014 1 new mobile based module PRWSS-C- Consultancy services for 5 SPMC-3172- P 20.00 SSS 16.02.2015 N/A N/A 18.02.2015 N/A N/A 22.02.2015 M/s Deliotte 1.03.2015 Project Preparation support 1 PRWSS-C- Consultancy services for 6 SPMC-3172- A 20.00 SSS Project Preparation support 2