ENHANCING COASTAL AND OCEAN RESOURCE EFFICIENCY PROGRAM ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK including RESETTLEMENT POILICY FRAMEWORK, INDEGENOUS PEOPLES PLANNING FRAMEWORK, LABOUR MANAGEMENT PLAN and GENDER ACTION PLAN Volume I FINAL REPORT Prepared by SOCIETY OF INTEGRATED COASTAL MANAGEMENT (SICOM) MINISTRY OF ENVIRONMENT, FORESTS AND CLIMATE CHANGE GOVERNMENT OF INDIA This is the Environmental and Social Management Framework (ESMF) – Volume I for the proposed Enhancing Coastal and Ocean Resource Efficiency (ENCORE) Project with financial assistance from the World Bank. This is hereby disclosed after incorporating the comments / suggestions of the public / stakeholders on the Draft ESMF disclosed on 7 June 2019. Table of Contents EXECUTIVE SUMMARY ................................................................................ 1 CHAPTER 1. INTRODUCTION TO THE PROJECT ................................ 1 1.1 Program Description ................................................................................................ 1 1.1.1 Proposed Project Components .......................................................................................... 1 1.1.2 Environmental Characteristics of the Project Location .................................................. 3 1.1.3 Key Environment and Social Issues ................................................................................. 4 1.2 Need for an Environmental and Social Management Framework ...................... 5 1.3 Overview of the Environmental and Social Assessment and Framework .......... 5 1.3.1 Purpose of the ESMF ....................................................................................................... 5 1.3.2 The ESMF process............................................................................................................ 6 1.3.3 Revision/Modification of the ESMF ................................................................................ 7 1.3.4 Structure of the ESMF Report ......................................................................................... 7 CHAPTER 2. ENVIRONMENTAL AND SOCIAL ASSESSMENT OF COASTAL INDIA .......................................................................................... 9 2.1 Geographic Location ................................................................................................ 9 2.2 Physical Characteristics ........................................................................................... 9 2.2.1 Continental Shelf and slope............................................................................................ 11 2.2.2 Sediment Transport ......................................................................................................... 12 2.3 Climate .................................................................................................................... 13 2.4 Geology and Soils ................................................................................................... 13 2.5 Hydrology ................................................................................................................ 14 2.6 Rivers and Estuaries .............................................................................................. 15 2.6.1 Hooghly estuarine system ............................................................................................... 15 2.6.2 Estuaries of Peninsular India ........................................................................................ 16 2.7 The Coast of India .................................................................................................. 19 2.8 Islands ...................................................................................................................... 20 2.9 Extreme Events ....................................................................................................... 20 2.9.1 Tropical cyclones ............................................................................................................ 20 2.9.2 Storm surge ..................................................................................................................... 21 2.9.3 Tsunami ........................................................................................................................... 22 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 2.10 Climate Change and Sea Level Rise ..................................................................... 22 2.11 Coastal and Marine Ecosystems ........................................................................... 25 2.11.1 Coastal Ecosystems ......................................................................................................... 25 2.11.2 Coastal Terrestrial Ecosystems....................................................................................... 26 2.11.3 Mangrove Forests and Coastal Wetlands ...................................................................... 26 2.11.4 Salt Marsh ....................................................................................................................... 28 2.12 Marine Ecosystems ................................................................................................. 28 2.12.1 Coral Reefs ...................................................................................................................... 28 2.12.2 Seagrass Beds .................................................................................................................. 29 2.12.3 Seaweeds.......................................................................................................................... 29 2.12.4 Sandy Shores: Turtle Nesting Sites ................................................................................ 30 2.12.5 Intertidal Zone- Mudflats and Horseshoe Crab Habitats ............................................. 30 2.12.6 Protected Areas ............................................................................................................... 31 2.12.7 Other Protected Areas ..................................................................................................... 33 2.13 Marine Fauna ......................................................................................................... 36 2.13.1 Marine Mammals ............................................................................................................ 36 2.13.2 Birds ................................................................................................................................ 36 2.13.3 Marine turtles .................................................................................................................. 37 2.13.4 Sharks .............................................................................................................................. 37 2.13.5 Sea Cucumber ................................................................................................................. 38 2.14 Fish Resources ........................................................................................................ 38 2.15 Socioeconomic Characteristics .............................................................................. 39 2.15.1 Demographics ................................................................................................................. 39 2.15.2 Cities and Towns ............................................................................................................. 42 2.15.3 Urban Agglomerations.................................................................................................... 43 2.15.4 Fishing Villages .............................................................................................................. 43 2.15.5 Ethnicity .......................................................................................................................... 44 2.16 Economic Activities ................................................................................................ 44 2.16.1 Employment .................................................................................................................... 44 2.16.2 Agriculture ...................................................................................................................... 45 2.16.3 Fisheries .......................................................................................................................... 46 2.16.4 Aquaculture ..................................................................................................................... 47 2.16.5 Tourism and recreation .................................................................................................. 48 2.16.6 Ports and Harbours......................................................................................................... 48 2.16.7 Fishing ports and harbours ............................................................................................ 49 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 2.17 Essential Services in Coastal India ....................................................................... 50 2.18 Pollution of Rivers, Marine and Coastal Areas ................................................... 51 2.19 Institutional Baseline.............................................................................................. 53 2.19.1 Ministry of Environment, Forests and Climate Change ............................................... 54 2.19.2 Science and information available for evidence-based decision making ..................... 58 CHAPTER 3. REGULATORY FRAMEWORK ........................................ 61 3.1 Environmental Laws / Regulations Applicable for ENCORE ........................... 61 3.1.1 National Environment Policy, 2006 ............................................................................... 62 3.1.2 National Policy on Marine Fisheries, 2017 ................................................................... 62 3.1.3 National Policy on Disaster Management, 2009 ........................................................... 63 3.1.4 Environment Protection (Act) 1986 ............................................................................... 63 3.1.5 Coastal Regulation Zone Notification............................................................................ 64 3.1.6 Island Protection Zone Notification ............................................................................... 65 3.1.7 EIA Notification .............................................................................................................. 66 3.1.8 Wildlife Protection Act, 1972 .......................................................................................... 67 3.1.9 Forest Act ........................................................................................................................ 67 3.2 Social Laws / Regulations Applicable for ENCORE........................................... 68 3.2.1 National Policy for Women ............................................................................................ 68 3.2.2 Tribal Development and Tribal Sub-Plan (TSP) Approach .......................................... 68 3.2.3 Right to Fair Compensation and Transparency in Land Acquisition, Resettlement and Rehabilitation (RFCTLAR&R) Act, 2013 ...................................................................... 69 3.2.4 Panchayati Raj Act ......................................................................................................... 71 3.2.5 Panchayats (Extension to the Scheduled Areas) Act, 1996 ........................................... 72 3.2.6 Constitution (Seventy Forth Amendment) Act, 1992 ..................................................... 73 3.2.7 Forest Rights Act, 2006................................................................................................... 75 3.2.8 Constitutional Safeguard for Scheduled Tribes ............................................................ 76 3.2.9 Equality of Opportunity in Matters of Public Employment .......................................... 76 3.2.10 The SCs and the STs (Prevention of Atrocities) Act, 1989 ............................................ 77 3.2.11 International Treaties ..................................................................................................... 78 3.2.12 Other Statutory Clearances Required ............................................................................ 81 3.2.13 Applicability of World Bank Operational Policies and Guidelines to ENCORE ......... 83 CHAPTER 4. ASSESSMENT OF PROBABLE IMPACTS DUE TO SUBPROJECTS ............................................................................................ 87 4.1 Subproject Typology .............................................................................................. 87 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 4.1.1 Impact Assessment Methodology ................................................................................... 87 CHAPTER 5. ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK ........................................................................................... 107 5.1 ESMF Adoption Framework............................................................................... 108 5.2 Sub-project Identification and Initiation ........................................................... 109 5.2.1 Project Environmental and Social Screening .............................................................. 109 5.2.2 Categorisation of the Projects ...................................................................................... 111 5.3 Project Preparation .............................................................................................. 118 5.3.1 Preparation of Terms of Reference for Environmental and Social Assessment ........ 118 5.3.2 Need for Strategic Environmental and Social Assessment (SESA) Approach ........... 119 5.3.3 Environmental and Social Impact Assessment (ESIA) ............................................... 120 5.3.4 Environmental Social Management Plan (ESMP) ..................................................... 121 5.3.5 Cost for Mitigation Measures including Monitoring Plan.......................................... 122 5.3.6 Proposed Institutional Mechanism and Reporting Requirements for Subprojects .... 122 5.4 Project Appraisal .................................................................................................. 122 5.5 Project Implementation ....................................................................................... 123 5.5.1 Incorporating ESMP/GESMP into Contract Documents ........................................... 123 5.5.2 Onsite implementation of ESMP .................................................................................. 126 5.6 Monitoring and Evaluation ................................................................................. 127 5.6.1 Sub-Project Monitoring ................................................................................................ 127 5.6.2 Construction Supervision and Quality Control ........................................................... 127 5.6.3 Annual Environmental and Social Audit..................................................................... 127 5.7 Public Consultation and Stakeholder Participation ......................................... 129 5.7.1 Public Disclosure .......................................................................................................... 129 5.7.2 ESMF and Technical Assistance (TA) activities ......................................................... 130 CHAPTER 6. RESETTLEMENT POLICY FRAMEWORK ................. 132 6.1 Resettlement Policy Framework ......................................................................... 140 6.2 Broad Principles ................................................................................................... 141 6.3 Resettlement Action Plan (RAP) ......................................................................... 144 6.4 Delayed Compensation Adjustment ................................................................... 146 CHAPTER 7. INDEGENOUS PEOPLES PLANNING FRAMEWORK 152 7.1 Introduction .......................................................................................................... 152 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 7.2 Process ................................................................................................................... 154 7.3 Entitlement ............................................................................................................ 157 7.4 R & R Benefits for Tribal Project Affected People ........................................... 157 7.5 Tribal Peoples Plans (TPP) .................................................................................. 158 7.6 Suggested Format for TPP .................................................................................. 158 7.7 Key Elements of TPP and Participatory Approach .......................................... 159 7.8 Approval and Disclosure ..................................................................................... 159 7.9 Implementation Arrangements ........................................................................... 159 7.10 Monitoring and Evaluation ................................................................................. 160 CHAPTER 8. GENDER ACTION PLAN .................................................. 161 8.1 Gender Equity ...................................................................................................... 161 8.2 Policy Provision .................................................................................................... 162 8.3 Issues of Significance ............................................................................................ 164 8.4 Key Activities in Project Cycle ............................................................................ 172 8.5 Monitoring Gender Action Plan ......................................................................... 173 8.6 Implementation Arrangements ........................................................................... 174 8.7 Framework for citizen engagement .................................................................... 174 CHAPTER 9. LABOUR MANAGEMENT FRAMEWORK .................. 175 9.1 Labour influx ........................................................................................................ 175 9.2 Construction Labour Management Plan ........................................................... 175 9.2.1 Objectives ...................................................................................................................... 175 9.2.2 General Requirements .................................................................................................. 176 9.2.3 Hiring and Recruitment Procedure.............................................................................. 176 9.2.4 Worker’s Accommodation ............................................................................................ 177 9.2.5 Security .......................................................................................................................... 178 9.2.6 Provisions for Drinking Water ..................................................................................... 178 9.2.7 Cooking Arrangements ................................................................................................. 178 9.2.8 Wastewater Generation................................................................................................. 179 9.2.9 Solid Waste Management ............................................................................................. 179 9.2.10 Medical Facilities .......................................................................................................... 179 9.2.11 Recreation Facilities ..................................................................................................... 180 9.2.12 Inspection of Accommodation Facilities ...................................................................... 180 9.3 Contractor’s responsibility .................................................................................. 182 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I CHAPTER 10. INSTITUTIONAL FRAMEWORK AND BUDGET FOR ESMF ADOPTION ..................................................................................... 184 10.1 Proposed Institutional Framework at National, State, Project Levels ............ 184 10.1.1 NPMU............................................................................................................................ 185 10.1.2 SPMUs ........................................................................................................................... 186 10.1.3 Project Executing Agencies (PEAs) ............................................................................. 187 10.1.4 Project Management Consultants (PMCs) .................................................................. 188 10.2 Capacity Building ................................................................................................. 188 10.2.1 Subproject Monitoring: Environmental and Social Management.............................. 193 10.2.2 Reporting Formats ........................................................................................................ 194 10.3 Budget for ESMF Implementation ..................................................................... 194 10.4 The Roles and Responsibilities of the World Bank ........................................... 196 CHAPTER 11. GRIEVANCE REDRESS MECHANISM, CONSULTATIONS AND INFORMATION DISCLOSURE ................ 197 11.1 Grievance Redress Mechanism ........................................................................... 197 11.2 Web Based Grievance Mechanism ..................................................................... 197 11.3 Three-tier Grievance Management System ....................................................... 198 11.3.1 First-tier Grievance Redress ......................................................................................... 198 11.3.2 Second-tier Grievance Redress ..................................................................................... 199 11.3.3 Third-tier Grievance Redress ....................................................................................... 200 11.4 Assistance for aggrieved persons belonging to vulnerable groups for accessing legal recourse ........................................................................................................ 200 11.5 Stakeholder Consultation Framework ............................................................... 201 11.5.1 Need for Consultations ................................................................................................. 201 11.6 Information Disclosure ........................................................................................ 204 11.6.1 Procedure Information Disclosure Procedures ........................................................... 204 11.6.2 Information to be disclosed .......................................................................................... 205 11.7 Status of Consultations and Disclosure of this ESMF ...................................... 206 11.8 Conclusion ............................................................................................................. 208 ANNEXURES .................................................................................................. 209 Annexure I: Detailed Baseline Environmental Setting of Project States ......................... i Annexure II: Baseline Environmental Scenario of Indian Subcontinent .................. lviii Annexure III: Details of Applicable Regulations ........................................................... lxv Environmental and Social Management Framework for ENCORE Program, 2019. Vol I Annexure IV: List of Stakeholders Consulted for ESMF Preparation ....................... xcv Appendix V: Regulated Activities in CRZ Zones and Institutional Responsibility . cxvii Environmental and Social Management Framework for ENCORE Program, 2019. Vol I List of Tables Table 2.1: Key Characteristics of the West and East Coasts ............................................. 19 Table 2.2: Sea Level Rise at Selected Tide Locations ......................................................... 23 Table 2.3: Extent of Mangroves in India ............................................................................. 27 Table 2.4: Major turtle nesting sites in India ...................................................................... 30 Table 2.5: Categories of Protected Areas ............................................................................ 34 Table 2.6: Major bird sanctuaries in India’s coastal states ............................................... 36 Table 2.7: Marine flora and fauna in Indian waters ......................................................... 38 Table 2.8: Population of India’s Coastal Districts .............................................................. 39 Table 2.9: Classification of cities based on population ....................................................... 42 Table 2.10: State-wise number of different classes of towns.............................................. 42 Table 2.11: Coastal cities/Agglomerations with million plus population ......................... 43 Table 2.12: Major marine fishing Communities of India ................................................. 44 Table 2.13: Worker Participation Rate in India ................................................................. 45 Table 2.14: Coastal Aquaculture farms as of 2014 ............................................................. 47 Table 2.15: State wise number of ports in India ................................................................. 49 Table 2.16: States / UT-wise Number of Major, Minor Fishing Harbours and Fish Landing Centres Commissioned / Under Construction till 2011-12 ............. 50 Table 3:1 International Environmental Agreements.......................................................... 78 Table 3:2 Key Statutory Clearances Required for Project Activities ............................... 81 Table 3.3: World Bank Safeguard Policies applicable for the Project ............................. 85 Table 4:1 Aspects for Determining the Magnitude of Impacts.......................................... 88 Table 4:2 Criteria for Determining Sensitivity ................................................................... 89 Table 4:3 Assessment of Significance of Negative and Positive Impacts .......................... 89 Table 5:1: List of Non-permissible Activities under ENCORE ....................................... 109 Table 5:2 Sensitive Environmental Components .............................................................. 112 Table 5:3 Environmental Categorization of Projects ....................................................... 113 Table 5:4 Indicative Environmental and Social Category of Subproject Types ............ 114 Table 5:5 Social Categorization of Projects....................................................................... 116 Table 5:6 Potential Environmental Enhancement Opportunities in SubProjects * ...... 117 Table 6.1: Entitlement Matrix ............................................................................................ 146 Table 7.1 Distribution of Tribal Population in Coastal Districts .................................... 152 Table 8.1: Opportunities for Involvement of Women during Project stages ................. 172 Table 8.2: Monitoring Indicators for Gender Action Plan .............................................. 173 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I Table 10:1 Outline of the Proposed Capacity Building Program on ENCORE (2020 – 2025) ................................................................................................................... 190 Table 10:2 Monitoring Schedule......................................................................................... 193 Table 10:3 Proposed Budget for ESMF Implementation ................................................. 195 Table 11.2: Information Disclosure Matrix ....................................................................... 205 Table A:1 Key Statistics of India ............................................................................................ii Table A:2 Key Statistics of Gujarat State............................................................................. vi Table A:3 Key Statistics of Maharashtra State ..................................................................... x Table A:4 Key Statistics of Goa .......................................................................................... xiii Table A:5 Key Statistics of Karnataka State .....................................................................xvii Table A:6 Key Statistics of Kerala State............................................................................xxii Table A:7 Key Statistics of Tamil Nadu State .................................................................. xxvi Table A:8 Key Statistics of Andhra Pradesh State ........................................................... xxx Table A:9 Key Statistics of Odisha State ........................................................................ xxxiv Table A:10 Key Statistics of West Bengal State .......................................................... xxxviii Table A:11 Key Statistics of Daman Diu .............................................................................xli Table A:12 Key Statistics of Lakshadweep Islands ..........................................................xliv Table A:13 Key Statistics of Andaman and Nicobar Islands......................................... xlvii Table A:14 Key Statistics of Union Territory of Puducherry..........................................xlix Table A:15 Key Statistics of Karaikal in Puducherry ..........................................................li Table A:16 Key Statistics of Mahe in Puducherry ............................................................ liii Table A:17 Key Statistics of Yanam in Puducherry ...........................................................liv Table A.18 Attributes of Various Climatic Zones...............................................................lix Table A:19 Demographic Profile of India ............................................................................ lx Table A:20 List of Archaeological Monuments...................................................................lxi Table A:21 Major Natural Disasters which occurred in India ....................................... lxii Table A:22 Key Regulations Applicable to ENCORE....................................................... lxv Environmental and Social Management Framework for ENCORE Program, 2019. Vol I List of Figures Figure 2.1: a)Temporal drift of the Indian Plate before its collision with Asia (Eurasian Plate), b) Time sequence of 3-D views of mantle convection and drifting continents ............................................................................................................. 10 Figure 2.2: Continental shelf and slope along the Indian coast ......................................... 11 Figure 2.3: Depth contour map for the Indian coast .......................................................... 12 Figure 2.4: Geological Map of Coastal India ..................................................................... 13 Figure 2.5: Hydrogeological Map of India .......................................................................... 14 Figure 2.6: The major estuaries along the coast of India ................................................... 15 Figure 2.7: Observed Data: Tide Gauge Record and Satellite Altimeter ......................... 24 Figure 2.8: Classification of forest types in India highlighting forest types found in coastal areas ..................................................................................................................... 25 Figure 2.9: Mangrove Forests of India ................................................................................ 28 Figure 2.10: State-wise Registered Aquaculture Farms ..................................................... 48 Figure 3.1: Legislation and Policy Instruments directly / indirectly Applicable to some Subprojects .......................................................................................................... 61 Figure 3.2: Overview of the EIA Process in India .............................................................. 66 Figure 5:1 Environmental and Social Management Framework for ENCORE ............ 108 Figure 5:2 Environmental and Social Requirements during Sub Project Cycle ........... 131 Figure 8:1 Proposed Institutional Framework for Safeguards Management for ENCORE ............................................................................................................................ 184 Figure A:1 Coastal States of India .......................................................................................... i Figure A:2 Coastal Districts of India .....................................................................................ii Figure A:3 Districts of Gujarat .............................................................................................. v Figure A:4 Coastal Districts and Taluks of Gujarat ........................................................... vi Figure A:5 Districts of Maharashtra..................................................................................... ix Figure A:6 Coastal Districts and Taluks of Maharashtra .................................................. ix Figure A:7 Districts and Taluks of Goa ...............................................................................xii Figure A:8 Districts of Karnataka........................................................................................ xv Figure A:9 Coastal Districts and Taluks of Karnataka .................................................... xvi Figure A:10 Districts of Kerala ............................................................................................ xx Figure A:11 Coastal Districts and Taluks of Kerala ......................................................... xxi Figure A:12 Districts of Tamil Nadu ................................................................................. xxiv Figure A:13 Coastal Districts and Taluks of Tamil Nadu................................................ xxv Figure A:14 Districts of Andhra Pradesh ...................................................................... xxviii Environmental and Social Management Framework for ENCORE Program, 2019. Vol I Figure A:15 Coastal Districts and Taluks of Andhra Pradesh ....................................... xxix Figure A:16 Districts of Odisha ........................................................................................xxxii Figure A:17 Coastal Districts and Taluks of Odisha .................................................... xxxiii Figure A:18 Districts of West Bengal .............................................................................. xxxvi Figure A:19 Coastal Districts and Taluks of West Bengal ...........................................xxxvii Figure A:20 Location Map of Daman and Diu .................................................................... xl Figure A:21 Lakshadweep Islands .................................................................................... xliii Figure A:22 Andaman and Nicobar Islands ......................................................................xlvi Figure A:23 Distribution of Union Territory of Puducherry ..........................................xlix Figure A:24 Climatic Zones of India ................................................................................. lviii Environmental and Social Management Framework for ENCORE Program, 2019. Vol I List of Abbreviations Abbreviation Expansion A&N Andaman and Nicobar (Islands) AEWA African-Eurasian Migratory Water Birds AMASR Ancient Monuments and Archaeological Sites and Remains Act APD Assistant Project Director ASI Archeological Survey of India BOQ Bill of Quantities BP Bank Procedures BPL Below Poverty Line CAA Coastal Aquaculture Authority CBD Convention on Biological Diversity CBO Community Based Organization CC Climate Change CESIA Cumulative Environmental Impact Assessment CIA Coastal Environmental Impact Assessment CMS Conservation of Migratory Species CMR Coastal and Marine Resources Conservation CoI Corridor of Impact CPCB Central Pollution Control Board CPR Common Property Resource CRZ Coastal Regulation Zone CSD Commission on Sustainable Development CVCA Critically Vulnerable Coastal Areas CZMP Coastal Zone Management Plan DCZMA District Coastal Zone Management Authority DLI Development Linked Indicators DPC District Planning Committee DPR Detailed Project Report DTP Directorate of Town Panchayats E&S Environmental and Social EA Environmental Assessment EAFM Ecosystems Approach to Fisheries Management EAP Externally Aided Project EAR Environmental Assessment Report ECoP Environmental Codes of Practice EEZ Exclusive Economic Zone EHS Environmental Health and Safety ESHS Environmental, and Social Health & Safety ESCAP Economic and Social Council for Asia and Pacific ESZ Ecosensitive Zone EIA Environmental Impact Assessment ESIA Environmental Impact Assessment ESMF Environmental Management Framework ESMP Environmental Management Plan Environmental and Social Management Framework for ENCORE Program, 2019. Vol I Abbreviation Expansion ENCORE Enhancing Coastal and Ocean Resource Efficiency ESA Environmentally Sensitive Areas ESAR Environmental and Social Assessment Report ESIA Environmental and Social Impact Assessment ESF Environmental and Social Framework ESMF Environmental and Social Management Framework ESR Environmental and Social Report ESSM Environmental and Social Safeguards Manager ESSO Earth System Sciences Organization ETP Effluent Treatment Plant FAR Floor Area Ratio FAQ Frequently Asked Questions FGD Focus Group Discussions FSI Floor Space Index GDP Gross Domestic Product GEF Global Environment Facility GEO Geospatial Sciences GHG Greenhouse Gas GIIP Good International Industry Practice GIS Geographic Information System GoI Government of India GRC Grievance Redressal Committee HL Hazard Line HR Human Resources HTL High Tide Line ICB International Competitive Bidding ICMOD International Centre for Integrated Mountain Development ICRZ Island Coastal Regulation Zone ICZMP Integrated Coastal Zone Management Plan IDU Internal Documents Unit (The World Bank) IEC Information Education Communication IFC International Finance Corporation IIMP Integrated Islands Management Plans INCCA Indian Network for Climate Change Assessment INCOIS Indian National Centre for Ocean Information Services IP Indigenous People IPF Investment Project financing IPPF Indigenous People Policy Framework IPZ Island Protection Zone ISR Initial Screening Report ITEWS Indian Tsunami Early Warning System IT Island Territories IUCN International Union for Conservation of Nature KGP Knowledge, Governance and Policy Environmental and Social Management Framework for ENCORE Program, 2019. Vol I Abbreviation Expansion LB Local Body (Urban or Rural) LTL Low Tide Line LULC Landuse and Land Classification M&E Monitoring and Evaluation MA Multilateral Agencies MADA Modified Area Development Approach MoEFCC Ministry of Environment, Forests and Climate Change MPA Multi-phase Programmatic Approach NCB National Competitive Bidding NCSCM National Centre for sustainable Coastal Management NCZMA National Coastal Zone Management Authority NDZ No Development Zone NEP National Environmental Policy NGO Non-Governmental Organization NIOT National Institute of Ocean Technology NMA National Monuments Authority NOC No Objection Certificate NPD National Project Director NPDM National Policy on Disaster Management NPMU National Project Management Unit O&M Operations and Maintenance OD Operational Directives OHS Occupational Health and Safety OP Operational Policies PAF Project Affected Family PAP Project Affected Person PAP Program Action Plan PCB Pollution Control Board PCR Physical Cultural Resources PCRMP Physical Cultural Resources Management Plan PD Project Director PDO Program Development Outcome PEA Project implementation Agency PESA Panchayats (Extension to the Scheduled Areas) Act PMC Project Management Consultant PMU Project Management Unit POP Persistent Organic Pollutants PPP Public Private Partnership PPR Preliminary Project Report PWD Public Works Department QA Quality Assurance RAP Resettlement Action Plan R&R Resettlement and Rehabilitation RMP Risk Management Plan Environmental and Social Management Framework for ENCORE Program, 2019. Vol I Abbreviation Expansion ROB Road Over Bridge RoHS Restriction of Hazardous Substances RoW Right of Way RP/RAP Resettlement Plan/ Resettlement Action Plan RTFCTLARR Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement RUB Road Under Bridge SACEP South Asia Cooperative environment Program SAR Social Assessment Report SAARC South Asian Association for Regional Co-operation SAICM Strategic Approach to International Chemicals Management SCZMA State Coastal Zone Management Authority SDGs Sustainable Development Goals SEIAA State Environmental Impact Assessment Authority SESA Strategic Environmental and Social Assessment SEC Sensitive Environmental Components SHC Stakeholder Consultations SIA Social Impact Assessment SICOM Society of Integrated Coastal Management SoI Survey of India SPMU State Project Management Unit SSR Social Status Report STP Sewage Treatment Plant SWD Storm Water Drains SWM Solid Waste Management TA Technical Assistance ToR Terms of Reference TSP Tribal Sub Plan ULB Urban Local Body UNCED United Nations Conference on Environment and Development UNEP United Nations Environment Program UNFCCC United Nations Framework Convention on Climate Change UT Union Territories (of the Government of India) WB The World Bank WLPA Wildlife Protection Act WTP Water Treatment Plant Environmental and Social Management Framework for ENCORE Program, 2019. Vol I ENHANCING COASTAL AND OCEAN RESOURCE EFFICIENCY (ENCORE) PROJECT ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK EXECUTIVE SUMMARY A. Project Overview The ENCORE is proposed as an eight-year Multi phase Programmatic Aproach (MPA) operation with two overlapping phases of five years each that are anchored in the umbrella of India’s National Coastal Mission. The ENCORE Project (P167804), phase I of MPA; aims to strengthen integrated coastal zone management in all coastal States and Union Territories of India through the following components. ▪ Component 1. Improved Capacity for Decentralized Coastal Management ▪ Component 2. Improved Protection and Pollution Abatement in Coastal Areas ▪ Component 3. Project Management, Monitoring, and Evaluation The Program seeks to assist the Government of India (GoI) in enhancing coastal resource efficiency and resilience, by building collective capacity (including communities and decentralized governance) for adopting and implementing Integrated Coastal Zone Management (ICZM) approaches. Recognizing ICZM as a continuous process rather than a one-off investment action, ENCORE will build upon and draw from the experience of the ongoing World Bank-supported Integrated Coastal Zone Management Project (ICZMP – P 097985), including the linkages between coastal conservation, climate resilience, and poverty reduction. During Phase I, project activities considered for implementation in Eight (08) States / and Three (03) Union Territories (UTs) of coastal India relate to improving the coastal environment; leveraging the concepts of resource efficiency. Three coastal States, namely; Gujarat, Odisha and West Bengal have prepared ICZM Plans as part of the ICZMP Project. During MPA Phase I, ICZM Plans would be prepared for the selected coastal stretches in other States/UTs under the program. In addition to priority projects for coastal pollution prevention, livelihood support and coastal resilience identified in these Plans, those investments which will inform effective coastal management solutions to guide ICZM Plan preparation in these States/UTs will also be taken up for pilot or demonstration purposes during MPA Phase I. Institutional capacity building for effective coastal management, Mapping and Database creation, and Monitoring and Research Facilities will also be supported under Phase I. Investments proposed by the States/UTs include a) mangrove afforestation, shelter bed plantations and other infrastructure for coastal protection, b) habitat conservation activities such as restoration of seagrass meadows, eco-restoration of sacred groves, development of hatcheries, rearing and rescue centers for turtles, and other marine animals, c) environmental Environmental and Social Management Framework for ENCORE Program, 2019 ES-1 infrastructure works including solid (including plastics/marine litter) and liquid waste management in small coastal towns for pollution abatement and protection of marine/coastal habitats, water harvesting, restoration and recharge of water bodies, beach cleaning and development. Livelihood improvement projects include demonstration of climate-resilient saline agriculture, creation of infrastructure and facilities to support ecotourism, community- based small-scale mariculture, seaweed cultivation, aquaponics, small household industries, and value addition to other livelihood activities ranging from fish processing and preparation of value-added products to local crafts. Since ENCORE Program is funded under the Investment Project Financing (IPF) instrument of the World Bank, its Operational Policies (OPs) and Bank Procedures (BPs) are applicable for the project. ENCORE also aims to use Development Linked Indicators (DLIs) and as under regular IPF, environmental and social requirements apply to all activities for which Bank support is sought by the Borrower, as defined in the project’s legal agreement between the Borrower and the Bank, whether they are financed by the Bank or from another source. The scope of the environmental assessment includes the ‘area of influence’ of Bank-financed activities, which may span an entire sector or region. In each case, the Bank policies are applied and compliance with them is verified at the same level. Project Concept Note Review for ENCORE program was before 01 October 2018 (cutoff date1 for application of World Bank’s new Environmental and Social Framework (ESF)). Hence World Bank Safeguard policies apply to Phase I of this MPA and the safeguards instruments will be reassessed in line with the ESF as and when Phase II of the project is prepared for approval by the World Bank’s Board of Directors. B. Baseline Assessment and Environment and Social Issues It is envisaged that the project would lead to positive impacts, including marine and coastal conservation, pollution prevention and effective utilization of coastal resources, and promotion of sustainable coastal livelihoods. Rather than ad-hoc placing and implementation of project investments in time and space without adequate planning considerations, the ICZM Plan which would be prepared by each State as part of the program would set the stage for investments, with a scientific basis; considering the environmental, social and climate-related sensitivities among others. Thus, the program mandate subsumes safeguards management as an integral part of the project objectives and implementation. The assessment reveals no large scale, significant and/or irreversible environmental or social impacts due to the proposed project interventions. The program will avoid undertaking any activities that will cause significant conversion or negative impacts on natural habitats and sensitive environmental receptors. Activities that may have cumulative/regional impacts or larger scale of construction / Operation and Maintenance (O&M) stage impacts (such as waste management, coastal protection structures) will be taken up for implementation only if its necessity is established and guided by ICZM Plans. While the overall program is thus 1 ESF is applicable to all project financing prepared post 01 October 2018 Environmental and Social Management Framework for ENCORE Program, 2019 ES-2 environmentally beneficial, some activities such as construction and up-gradation of infrastructure and facilities for coastal protection and pollution prevention, and certain livelihood support activities are likely to result in low to moderate risks and impacts if designed without adequate care. These can effectively be managed across the detailed design and implementation phases of the investments. Private land acquisition is not envisaged under the project. Mangrove plantations and small infrastructure in villages will be carried out on public land. Rehabilitation of assets will be in- situ and will not require any additional land. However, there are chances of encroachment of public land. During the construction phase, the influx of large numbers of migrant workers in the project area is also not envisaged as assets to be created will be small. Mangrove plantations and rehabilitation work will be undertaken by the local community. At the same time, the Project will benefit the community in general. The subprojects need careful planning to ensure inclusion and equity so that the project benefits reach all. Considering the spread of project activities along multiple locations in coastal India, Safeguards Category is considered as “A” as per the World Bank’s Safeguards Policy OP 4.01 Environmental Assessment. Detailed environmental and social assessment considering cumulative impacts has been conducted by the Borrower. Impact assessment reveals that most of the likely adverse impacts could be avoided, minimized or eliminated by adopting proper design and standard mitigation measures. Also, there is ample scope to enhance some of the beneficial impacts to be generated from the proposed projects, following the Bank safeguard policies. Based on this assessment and enhancement and mitigation opportunities, a framework for the management of environmental and social aspects under the project has been prepared by the borrower, as the investments or locations for all subprojects are not finalized yet. C. Environmental and Social Management Framework The Environmental and Social Management Framework (ESMF) prepared for the ENCORE Program acknowledges the probable impacts of the subprojects, and integrates measures for assessing, avoiding, mitigating and managing these during planning / pre-construction, construction, and operation and management (O&M) stages of the subprojects. The framework identifies the level of safeguard and due-diligence required for all categories of sub-projects and provides specific guidance on the policies and procedures to be followed for environmental and social assessment, along with roles and responsibilities of the implementing agencies to ensure effective environmental and social management. The ESMF aims to ensure the following: • integration of environmental and social aspects into the decision-making process at all stages of the sub-projects by identifying, avoiding and/or minimizing adverse environmental and social impacts early-on in the project cycle, • Enhancement of positive/sustainable environmental and social outcomes through sensitive planning, design, and implementation of sub-projects, Environmental and Social Management Framework for ENCORE Program, 2019 ES-3 • Avoidance or minimization of impacts on cultural properties and natural habitats and/or other direct/indirect impacts through careful planning and safeguards, • Restoration or improvement of the livelihoods and living standards of the subproject affected people (if any) and compensate any loss of livelihood or assets, and • Adoption of occupational and community health and safety standards including, labor/work campsite management, contract management, monitoring/supervision protocols, and capacity building. ESMF for ENCORE Program is presented in two Volumes; Volume I and Volume II. Volume I presents the Baseline Environmental and Social Assessment, ESMF for this project discussing the applicable regulations, the process for carrying out subproject environmental screening, assessment, preparation of environmental and social management plan including mitigation measures, and monitoring plan. It also presents the Resettlement Policy Framework, Indigenous Peoples Planning Framework (IPPF)2, Gender Action Plan, Labor Management Framework and Grievance Redressal Mechanism. It also presents the institutional mechanism and its budgetary requirements for implementing the ESMF, process for updating this ESMF in addition to details on Stakeholder Consultation and Information Disclosure (for ESMF and subprojects). Volume II presents the documentation formats to be used for screening of projects, sample Terms of References (ToRs) for (i) Impact Assessment, (ii) Specialists to manage ESMF, and (iii) auditing/monitoring compliance to ESMF. It also provides guidance materials for licenses, permits, clearances under various regulations, and indicative Environmental and Social Management Plans (ESMPs) and monitoring plans for typical subprojects. It also presents a comprehensive set of Environmental Codes of Practices (ECoPs) for guiding various project activities. D. Applicable Environmental Regulations Applicable National and State regulations, various international treaties, and the World Bank Operational Policies need to be considered for siting criteria, environmental pollution control requirements, institutional arrangements, ensuring occupational health and safety, resource utilization and considerations on cultural and social aspects. Several national and state-level environment and social laws will be applicable to ENCORE, including (but not limited to) the Environment (Protection) Act, 1986; Coastal Regulation Zone Notification 2019, Forest (Conservation) Act, 1980; Wildlife Conservation Act, 1972, Biodiversity Act 2002, Water (Prevention and Control of Pollution) Act, 1974; Air (Prevention and Control of Pollution) Act 2 Given the broad geographical coverage of the project, a framework IPPF has been prepared and disclosed on precautionary basis. It is going to be used for screening of all ENCORE sub- projects and, if presence of tribal population is established in any sub-project, Free, Prior and Informed Consultation will be carried out and Indigenous Peoples Plan (IPP) will be prepared for that sub-project. Respectively, the regional safeguards unit has reviewed and cleared the IPPF but not any individual IPP. Environmental and Social Management Framework for ENCORE Program, 2019 ES-4 1981; Solid waste (Handling and Management) Rules, 2016; Plastic waste Management Rules 2018, Construction and Demolition Waste Management Rules 2016, Labor laws, Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013; Street Vendors (Protection of Livelihood and Regulation of Street Vending) Act, 2014. The following policies of the World Bank are applicable for Phase I of this Multi-Phase Program: a) Environmental Assessment (OP/BP 4.01), b) Natural Habitats (OP/BP 4.04), c) Pest Management (OP 4.09), d) Forests (OP/BP 4.36), e) Physical Cultural Resources (OP/BP 4.11), f) Indigenous Peoples Policy (OP/BP 4.10), g) Involuntary Resettlement (OP/ BP 4.12) and World Bank Policy on Access to Information and Disclosure. The ESMF also recommends World Bank Group (WBG) Environmental Health and Safety (EHS) Guidelines for all projects, and WBG Industry Sector Guidelines as applicable to the sub-projects such as Waste Management Facilities, Water and Sanitation. E. ESMF Process ESMF describes the process to be adopted to screen the subprojects to decide on including or excluding them; to categorize based on defined criteria and to manage these using either full- fledged ESIAs and ESMPs or using Generic ESMP. ESMF describes the process, institutional mechanism, and budget to undertake screening, scoping, assessing and incorporation of mitigation measures during the project cycle involving a) Sub-project Initiation, b) Sub-project Preparation, c) Sub-Project Implementation, d) Monitoring and Evaluation; presented in Figure A. Environmental and Social Management Framework for ENCORE Program, 2019 ES-5 Figure A: ESMF Process F. Environmental and Social Management for ENCORE Depending on the type of investments and nature of activities, proposed subprojects will have varying impacts on the environment. Hence, the type and extent of environmental assessment to be carried out to identify and mitigate the impacts also largely depends upon the complexities of project activities and exact locations. It is important to identify the probable impacts and plan for mitigation measures early on, to manage them effectively. To facilitate effective screening, under ENCORE Program, the subprojects are grouped into different categories – E1, E2, and E3 linked to extent and severity of impacts (depending on type of activities and locational characteristics) and regulatory requirements. As per the ESMF, the first step will be to conduct screening exercise, where the environmental and social issues will be identified by undertaking initial environmental and social examination and the filling of the Environmental and Social Screening Checklist for the potential sub- projects. The objective of filling this checklist will be to collect basic information on environmental and social baseline parameters, issues, and potential impacts. Based on this, the sub-projects will be categorized. Based on the screening process undertaken, Environmental and Social Specialists of the SPMU would undertake project categorization. They would Environmental and Social Management Framework for ENCORE Program, 2019 ES-6 classify subproject into E1, E2, E3 as per severity and extent of environmental impacts and S1, S2 and S3 based on social impacts. Projects categorized as E1 will follow the requirements of Bank OP 4.01 Category A project requirements, and E2, E3 projects will follow the requirements of Bank OP 4.01 Category B project requirements. Guidance is provided here for the indicative categorization of projects. Table A: Environmental Categorization of Projects Proposed Description Type of project Subproject Extent of Management measures Categories Environmental impacts E1 Major Project-specific EA preferably by - Projects impacting sensitive environmental an independent agency. In case the environmental components issues expected DPR consultant undertakes the including natural habitats ESIA for better alignment with project details; the ESIA will be - Projects requiring CRZ reviewed by an independent Clearance (National Level) as consultant. per CRZ Notification 2019 and Environmental Clearance Specific mitigation/monitoring as per EIA Notification 2006, measures including those to of MoEFCC improve environmental performance, ensure environmental sustainability and climate resilience/adaptation. E2 Moderate Project-specific EA along with the - Projects with impacts less environmental DPR. ESMP including measures to adverse (in intensity and issues expected improve environmental spread) than the E1 performance, sustainability ad category and mostly climate resilience/adaptation. generic. - Projects requiring only CRZ clearance (State Level) or Environmental Clearance (State Level) E3 No Generic ESMP. - Projects which would environmental These will also consider measures improve the environment issues expected to improve environmental without any negative performance, sustainability, and impacts. climate resilience/adaptation as part - Research and Capacity of overall design/plan building activities Also, in case a subproject has more than one among these subcomponents, the higher category applicable for any subcomponent would be considered as the category for the subproject as a whole. Categorization will also consider other sensitivities of the project locations such as proximity to valuable environmental features. Specialists shall apply adequate experience and expertise-based judgment to determine the category of subprojects. For projects not listed in the guidance tool, categorization will be done based on its environmental sensitivity. Any upward/ downward scaling of categories such as from E2 to E1 and vice versa requires proper Environmental and Social Management Framework for ENCORE Program, 2019 ES-7 justification, concurrence of Society of Integrated Coastal Management (SICOM) under MoEFCC which is the National Project Management Unit (NPMU) for ENCORE and shall follow National and State Regulations and the safeguard policies of the World Bank. In addition to addressing environmental issues, NPMU commits itself to explore opportunities for environmental enhancement in various sub-projects. Social categorization of subprojects would be based on the following criteria. Table B: Social Categorization of Projects Category Level of Issue Management Type of Projects Measure S1 Serious social issues SIA and RAP - If it involves acquisition of private land expected with major impacts (people lose more than 20 % of the productive assets) - If it involves physical displacement. S2 Moderate social issues SIA and - If impacts are limited to less than 200 expected Abbreviated Persons or about 50 families of minor RAP nature (people lose less than 20 percent of the productive assets). S3 No social issues expected; Social Screening - No private land acquisition or no impacts hence socially benign Report to PAPs. ESMF describes the process for managing and mitigating anticipated impacts by a) following Strategic Environmental and Social Assessments (SESA) approach as integral part of regional/sectoral plan preparation activities including ICZM Planning, b) Environmental and Social Impact Assessments (ESIA) and ESMPs for moderate-risk projects; and c) using Generic ESMPs for low-risk projects. Besides, a set of Environmental Codes of Practice are also included in the ESMF to guide the integration of environmental aspects in planning and project-related activities. ESMF also suggests the use of the World Bank Group EHS Guidelines on cross-cutting environmental and social, health, and safety issues potentially applicable to construction and other projects. Further, ESMF guides screening, assessing, planning and implementing mitigation measures, and supervising/monitoring the impacts on natural habitats, forests, physical cultural resources, and pest management. ESMF will be adopted for both Plan preparation, Technical Assistance and implementation of projects. Also, it is applicable for capacity building activities including improving the research facilities. The ESMF lays out the framework to identify and address environmental and social impacts across screening, ESIA preparation, ESMP implementation, and site decommissioning. ESMF also describes the improved institutional mechanism, capacity building and cross- learning of environmental actions at the National, State and Project levels, supervision and monitoring mechanisms and budget for ESMF implementation. Since location and design information for conducting activity-specific ESIAs for some of the project activities are likely to be available only during project implementation, the ESMF defines the detailed process for the consultations, reviews, and clearances. Environmental and Social Management Framework for ENCORE Program, 2019 ES-8 ` Figure B: Environmental and Social Requirements during Subproject Cycle Guidance for Subproject ESIAs/ESMPs ESMF provides guidance to prepare subproject ESIAs; as follows. • Guidance on Project Screening, Impact Assessment, Institutional Framework for implementation and O&M stages, including ESMP in contract documents, supervision and reporting, and Audit for monitoring the effectiveness of subproject Environmental Management • Indicative ESMPs are provided, which could serve as a guide for developing site- specific ESIAs when project details are finalized, • Guidance on Chance find procedures for Physical Cultural Resources, mitigation measures to be included in ESMPs, • Guidance on Physical Cultural Resources Management Plan if required to be prepared for physical cultural heritage areas • Guidance to include in ESMPs site-specific measures to protect natural habitats, provision for monitoring and evaluation to provide feedback on conservation outcomes and to provide guidance for developing or refining appropriate corrective actions, Environmental and Social Management Framework for ENCORE Program, 2019 ES-9 • Indicative Integrated Pest Management Plan (including expert support required) and guidance on minimizing impacts due to use of fertilizers/herbicides is also included in the ESMF, • ECoPs in Volume II provides guidelines for environmental management of certain project activities including which are seen to be of limited extent of impacts/risk, temporary and reversible, and readily managed with good practices during the implementation of the proposed project interventions. The Contractors can use these while preparing and implementing Contractors ESMP at work start, • Guidance is provided in Generic EMPs/ECoPs on how to minimize/avoid impacts in case of projects directly / indirectly related to Natural Habitats, • Specific guidelines for the ESIA consultant firms to prepare (i) labor campsite and management plan, Waste and silt disposal plans, (ii) Occupational Health and Safety management plan and (iii) archaeological chance find procedure; which forms an integral part of all subproject ESIAs falling in E1, E2 category, and (iv) Physical Cultural Resources Management Framework in case of cultural/heritage interventions, (v) Integrated Pest and Nutrient Management framework for agriculture and related activities where there may be possible need to use pesticides/weedicides, fertilizers. • Subproject ESIAs would require assessing such potential issues linked to temporary project induced labor influx, the specific impacts can only be assessed once the contractor is appointed and decides to outsource labor. ESMF also provides guidance on Labor Management procedures. Labor Management Framework will ensure that the potential impacts associated with the influx of labor on the host population and receiving environment are minimized through compliance with the national labor laws. It will also ensure the provision of safe and healthy working conditions and a comfortable environment for migrant labor. Contractor ESMP shall include a labor management Plan. Relevant clauses shall be included in the bid documents and provisions shall be made in the subproject ESMP. • Resettlement and Rehabilitation Action Plan (RAP): In case the project involves land acquisition against compensation or loss of livelihood or shelter, the project shall ensure that a satisfactory RAP has been prepared under the ESIA and shared with the affected persons and the local community. • The key objective of the Indigenous Peoples Plan (IPP) is to give special attention to tribal issues and concerns during the implementation of the project. The IPP prepared based on the framework provided in the ESMF will be discussed with and disclosed to the key stakeholders. This will be adopted on a full scale in the scheduled areas and as deemed necessary in the other areas. • The affected communities will be able to voice concerns and grievances and have them addressed through the Grievance Redressal Mechanism. Effective Grievance Redressal Mechanism gives an opportunity to the organization to implement a set of specific measures to ensure good governance accountability and transparency in managing and mitigation of environmental and social issues of a particular project. This consists of Environmental and Social Management Framework for ENCORE Program, 2019 ES-10 defining the process for recording/receiving complaints and their redressal in respect of environmental and social aspects. • ESIA and Project related information will be disclosed through public consultation and making relevant documents available in public locations. The SPMUs and associated PEAs will provide relevant safeguards information on time, in an accessible place, and in a form and languages understandable to affected persons and other stakeholders. G. Institutional Framework Ever since the ICZM Project (2010), NPMU has an established organizational support structure to ensure that the policy obligations and associated procedures in the ESMF are implemented. The implementation experience of ESMF in coastal management projects necessitates extension of the responsibility to respective SPMUs and Project Agencies / Project Executing Agencies (PEAs) to enhance safeguard arrangements at the implementation level, besides capacity building for continued incorporation of environmentally acceptable measures for all future coastal development activities. Further, the National Centre for Sustainable Coastal Management (NCSCM), under MoEFCC is capacitated to support NPMU in coastal management projects through its involvement in the ICZM Project. NCSCM has a specialised CRZ Cell and Cumulative environmental Impact Assessment division to support such assessments in addition to a wide pool of scientists/experts in coastal and marine biodiversity. PMC/SPMU or PEAs shall have forestry and biodiversity experts to ensure that in case project involves natural habitats or forest restoration, the project design incorporates means of addressing the potential for forest restoration to improve biodiversity and ecosystem functions and biodiversity aspects are well-considered and implemented/supervised. Proposed institutional framework at National, State and Project levels and suggested responsibilities for environmental and social safeguards are presented in the following Figure C. Environmental and Social Management Framework for ENCORE Program, 2019 ES-11 Figure C: Proposed Institutional Framework for Safeguards Management for ENCORE Preparation of Subproject Safeguards Documents Preparation of ESIAs for subprojects will be co-ordinated by environmental and social specialists at SPMUs, based on the screening format prepared and submitted by PEAs. DPR Consultants or independent consultants would prepare ESIAs with stakeholder consultations. ESIA will be discussed and the draft final report will be prepared with inputs from the Technical Review Committee. Any clarifications on the applicability of CRZ rules or technical and scientific aspects related to coastal, marine habitats and preparation of projects and/or special review of projects involving any natural habitats will be sent to NCSCM. After completion of review and finalization by SPMU, subproject ESIAs will be forwarded to NPMU. NPMU will review ESIAs to ensure compliance with ESMF and E1 / S1 projects will be forwarded to the World Bank for review and approval. NPMU will also prepare ESIAs through independent / DPR consultants for National Components. These will be sent to the World Bank for review and approval. The final version of ESIA with ESMP and RAP/IPPF Environmental and Social Management Framework for ENCORE Program, 2019 ES-12 reports in English with a non-technical summary in local language, shall be disclosed in the websites of the NPMU/ SPMUs/LBs/PEAs/District Collectorate/relevant departments and will be made available in notice boards or in offices easily accessible to the local people. The applicable ESMPs will be made part of the bid documents and will be updated during the subproject implementation phase, as required. This ESMF applies to all the components under the project along with its linked or associated activities irrespective of Bank financing and will be subject to Bank supervision. Implementation of Subproject ESMPs A multi-layered institutional structure is presented for the management of subproject environmental and social aspects during the implementation phase. Project/ Site Level At the Project level, the contractor is responsible for ESMP implementation on the ground and will maintain all site records. He will report on the progress of ESMP implementation to the Environmental Specialist of the PEA or Project Management Consultant (PMC) appointed in case of complex projects; both with full–time, dedicated Environmental and Social experts with appropriate qualifications and experience. PMC or PEAs shall have forestry and biodiversity experts to ensure that in case project involves natural habitats or forest restoration, the project design incorporates means of addressing the potential for forest restoration to improve biodiversity and ecosystem functions and biodiversity aspects are well-considered and implemented/supervised. State Level At State Level; SPMUs headed by Project Director and Assistant Project Director, will have dedicated environmental and social experts with appropriate qualification and experience for coordinating with PEAs (Urban Local Bodies / Respective Departments/others) for ensuring ESMF compliance, provide guidance, maintain records and submit the relevant documents/ reports to NPMU every quarter. SPMUs have/are already in the process of hiring the Environmental Specialist and Rural Development / Social Specialist, who will jointly manage environmental and social aspects of sub- projects. Construction Supervision and Quality Control Consultants will be hired by SPMUs and will contain a dedicated Environment, Social, Health and Safety officer to look at ESMP implementation, labor management, and occupational health and safety risks. For projects involving Natural Habitats, Quality Assurance Consultants will also monitor the implementation of mitigation measures through their expert with specialization in biodiversity conservation and management. Specialized consultants will be hired for the preparation and supervision of projects involving Physical cultural resources or pest management. Environmental and Social Management Framework for ENCORE Program, 2019 ES-13 National Level NPMU headed by Project Director and Assistant Project Director will supervise and monitor implementation of social and environmental safeguards for select category E1, S1, E2, S2 sub-projects under ENCORE as per this ESMF through Environmental and Social Safeguard Nodal Officers already part of their team. The biodiversity officer at NPMU will also provide inputs to review and clear projects involving natural habitats. Detailed Management Information System linking project details, scheduling and documentation to the ESIA process and ESMF implementation will support the NPMU in the effective preparation of safeguard instruments, supervision, and monitoring. H. Capacity Building ESMF envisages capacity building on safeguards and technical aspects for NPMU, and SPMUs, by organising annual sensitization programs, workshops, and training/capacity building, exposure visits in coordination with training institutions (experienced in various aspects of coastal management, infrastructure development or area development projects) and the World Bank. Cross-learning events/workshops where the States implementing the projects can learn from each other on operational issues and best practices will be organized. The proposed capacity building activities will be supported through appropriate Technical Assistance of ENCORE. The World Bank project task team, specifically the environmental and social specialists, will provide close supervision and necessary implementation support by reviewing and providing guidance on conducting screening, and the preparation of relevant safeguard instruments as well as providing training for SPMU/NPMU specialists. I. Monitoring and Supervision Provisions in the ESMF for supervision, monitoring, and reporting include: ▪ Reporting on Safeguards / ESMPs: Monthly (or as and when required) Implementation Report, by Contractor to PEA; Monthly Supervision Report by PEA / PMC to SPMU, Quarterly report by SPMU to NPMU (based on monthly report by PEAs/PMCs, Monitoring report by Quality assurance Consultants and quarterly supervision by SPMU). NPMU uses the Quarterly Progress Report submitted by SPMUs and sample site visits for progress monitoring. ▪ Safeguards monitoring report by Quality Assurance Consultants along with monitoring of Civil Works when the works are ongoing and at work exit/operations. For projects involving Natural Habitats, Quality Assurance Consultants will also monitor the implementation of mitigation measures through experts with specialization in biodiversity conservation and management. ▪ Annual Environmental and Social Audit for select projects (both National and State - all E1, S1 and select E2, S2) by independent consultants e) capacity building for Environmental and Social Management Environmental and Social Management Framework for ENCORE Program, 2019 ES-14 ▪ NPMU will undertake annual audits to review the status of ESMF compliance of all E- 1/S1 projects and sample E2/S2 projects. The draft report will be forwarded to the World Bank and upon approval, the final audit report will be disclosed and compliance will be ensured. ▪ Detailed Management Information System linking project details, scheduling and documentation of ESIA process and ESMF implementation will support the NPMU in the effective preparation of safeguard instruments, real-time supervision, and monitoring. J. Budget for ESMF Implementation To effectively implement the environmental and social management measures suggested as part of the ESMF, necessary budgetary provisions will be made in the DPRs for the individual sub-projects. The tentative budget for each of the projects should include environmental management costs including good engineering practices and cost of environmental and resettlement monitoring. Where this is not possible, the provision of a minimum of 2 percent of the sub-project cost needs to be earmarked for implementing ESMP measures. Also, provision for Environmental and Social Health and Safety (ESHS) performance security as in the World Bank Procurement documents shall be made to ensure ESMP implementation. All administrative costs for implementing the ESMF have been budgeted in program costs (as part of the budget for human resources and other facilities) while preparing the budget for PEA and PMU establishment and operations. Drawing from the project experience and current indicative costs of Category A projects a rough estimation of costs for safeguard management and ESMF implementation is expected to be Rs 170 Crores INR (23.4 million USD); around 6.5 percent of the total project cost considering the subproject locations spread along coastal States/UTs. All safeguards instruments have been inbuilt into the project modality and will be financed via the project and detailed project cost tables will include the necessary costs accordingly. Cost tables will be updated when the ESMF is updated as required. The associated cost to implement ESMPs as well as training for project staff, contractors and others as required. have been integrated into the project budget. The project will ensure that all works contracts will include the ESMP, and the cost of implementing the ESMP will be identified as an item in the Bill of Quantities. K. Public Consultation during Sub-Project Preparation and Implementation During sub-project preparation and implementation, the Local Bodies, NGOs and the hosts/public will also be consulted in addition to primary beneficiaries and stakeholders and their opinion on environmental and social aspects will be discussed and suitably considered. Bi-annual consultation meetings shall be organized at the project site and at the local bodies during the subproject design phase. Stakeholder consultation workshops with the participating departments and other stakeholders will be held regularly during implementation. The project monitoring and progress reports should also be made available online on the websites of PEA and SPMUs. Environmental and Social Management Framework for ENCORE Program, 2019 ES-15 L. Consultations and Disclosure of this ESMF The need for ESMF and its contents were presented to all participating States during various interactions during February – March 2019. The SICOM, the NPMU for the ENCORE Program also carried out one-to-one discussions on subprojects, their environmental and social aspects and ESMF procedures with the NCSCM, SPMUs, PEAs / other State representatives, academic / research institutes and the beneficiaries and host communities during the process of preparation of respective Project Reports and safeguards documents for ENCORE. A list of stakeholders who attended these meetings are provided in Annexure IV of Volume I of ESMF. The draft ESMF was disclosed on the SICOM website3 and NCSCM website4 in June 2019, with a request to the stakeholders and the public to provide comments. The hard copies of the document are also available at their offices and SPMU offices for reference. The draft ESMF has been reviewed for clearance by the World Bank and has also been disclosed in the Internal Documents Unit (IDU) of the World Bank following applicable procedures on Aug 1, 2019 5. The draft ESMF was also presented to the stakeholders during various State and National Level workshops, meetings and one-to-one discussions held during May - June 2019. All comments and suggestions (mainly clarifications) have been suitably incorporated in the document. Apart from national-level consultation, state-level consultations were also carried out. The comments received from state entities and various stakeholders have also been incorporated in the ESMF to finalize the same. Executive Summary of the ESMF has been translated into Hindi and local languages of project states for wider discussions and disclosed in the websites of NPMU and SPMUs. The major outcomes of (final) stakeholder consultations are as follows: • At the national level, the stakeholders expressed their willingness to implement the ESMF, • Stakeholders agreed to ensure that implementation of project interventions will not displace any community member to the extent possible, • Implementation of the Project and ESMF will ensure that there would be no harm to the coastal environment. The measures will enhance the life and livelihood of the community especially the fishermen who are dependent on the coastal area, • Community will be made aware of the proposed interventions and will be made partners in implementation wherever possible, • Community members to be trained so that they can subsequently manage the facility wherever required after completion of work. 3 http://sicom.nic.in/sites/default/files/ESMF-Encore%20-2019-Vol-I.pdf http://sicom.nic.in/sites/default/files/ESMF-Encore-%20Vol-%20II.pdf 4 http://www.ncscm.res.in/pdf_docs/ESMF%20-%20Encore%20-%202019-%20Vol-%20I.pdf http://www.ncscm.res.in/pdf_docs/ESMF-%20Encore-%20Vol-%20II.pdf 5 http://documents.worldbank.org/curated/en/362471564723196017/pdf/Environmental-and-Social-Management-Framework.pdf Environmental and Social Management Framework for ENCORE Program, 2019 ES-16 M. ESMF Performance Indicators The key performance indicators to be monitored for successful implementation of ESMF will be the following: ▪ Implementation of ESMP and (other social instruments) in a time-bound manner, ▪ Number of accidents during the construction phase, ▪ Status of compliances with regulatory requirements and clearances, ▪ Work opportunity for willing local laborers, ▪ Labor management standards as per WB group guidelines, ▪ Number of complaints handled within the scheduled time, ▪ Disclosure of project information and public consensus on the project and locations/sites involved. N. Conclusion ESMF document for ENCORE, presented in two volumes (Volume I and II) will act as the guidance document for management of environmental and social aspects and safeguards management for all components of the MPA Phase I. This is a living document and shall be updated, if required; following the consultations, approval and disclosure requirements of the World Bank. Environmental and Social Management Framework for ENCORE Program, 2019 ES-17 ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK CHAPTER 1. INTRODUCTION TO THE PROJECT 1.1 Program Description ENCORE aims to strengthen integrated coastal zone management in all coastal States and Union Territories of India. The Project seeks to assist the Government of India (GoI) in enhancing coastal resource efficiency and resilience by building collective capacity (including communities and decentralized governance) for adopting and implementing integrated coastal management approaches. Recognizing Integrated Coastal Zone Management (ICZM) as a continuous process rather than a one-off investment action, ENCORE will build upon and draw from the experience of the ongoing World Bank-supported Integrated Coastal Zone Management Project (ICZMP), including the linkages between coastal conservation, climate resilience, and poverty reduction. 1.1.1 Proposed Project Components Project activities considered for implementation in Seven (07) States / and Two (02) Union Territories (UTs) of coastal India relate to improving the coastal environment; leveraging the concepts of resource efficiency. Three coastal States, namely; Gujarat, Odisha and West Bengal have prepared ICZM Plans as part of the ICZMP Project supported by the World Bank. During MPA Phase I, ICZM Plans would be prepared for the selected coastal stretches in other States/UTs under the program. In addition to priority projects for coastal pollution prevention, livelihood support and coastal resilience identified in these ICZM Plans, those investments which will inform effective coastal management solutions to guide ICZM Plan preparation in these States/UTs will also be taken up for pilot or demonstration purposes during MPA Phase I. Institutional capacity building for effective coastal management, Mapping and Database creation, and Monitoring and Research Facilities would be supported under Phase I. Investments proposed by the States/UTs include a) mangrove afforestation, shelter bed plantation, b) habitat conservation activities such as restoration of seagrass meadows, eco-restoration of sacred groves, development of hatcheries, rearing/rescue canters for turtles and other marine animals etc, c) creation of infrastructure for tourism, restoration, and recharge of water bodies, beach cleaning, and development, other small infrastructure facilities. Livelihood improvement projects include demonstration of climate-resilient or salinity resistant agriculture, water harvesting, and recharge/storage, creation of infrastructure and facilities to support ecotourism, community-based; small-scale mariculture, seaweed cultivation, aquaponics, and value addition to other livelihood activities. Exact locations of all project investment activities are not known at this stage. The Project investments are expected to enhance and support coastal resources, minimize Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 1 coastal pollution and improve the livelihoods of coastal communities. It is envisaged that the project would lead to positive impacts, including marine and coastal conservation, pollution prevention and effective utilization of coastal resources, and promotion of sustainable coastal livelihoods. In addition, the project is expected to provide a scientific basis and an effective coastal management framework (including institutional capacity) for resource-efficient and integrated coastal management. The proposed project mandate subsumes safeguards management as an integral part of the project objectives and implementation. Rather than ad-hoc placing and labor- management of project investments in time and space without adequate planning considerations, the ICZM Plan which would be prepared as part of the project would set the stage for investments, with a scientific basis; considering the environmental, social and climate-related sensitivities among others. Though the siting of subprojects is taken care of by comprehensive ICZM Planning which is a prelude to the subproject preparation and implementation in the coastal zone, environmental impacts may be expected in case the subprojects are designed without adequate care. Environmental impacts on sensitive areas though meagre may include those due to change in landuse in or near environmentally sensitive coastal areas and impacts on environmental quality due to construction and related activities. The project will cause general construction stage impacts which include (i) increase in noise, dust, impacts on air quality or safety risks due to poor construction methods and inadequate operation and maintenance (O&M) of facilities; (ii) temporary water quality impacts resulting from possible drainage and sewage pollution; (iii) impacts related to movement of vehicles including increased congestion, and conflicts with pedestrian movements; iv) hindered access/temporary changes in access to, and the use of, public spaces during construction/excavation works; and (v) public health risks due to improper waste/debris, sludge, excavated silt/muck management, or lack of attention to labor management. Similarly, with project investments expected to spread along India’s entire coast, including island territories, it is likely that some locations may have the presence of the indigenous population. Project activities considered relate to improving the coastal environment; leveraging the concepts of resource efficiency. ICZM Plans would be prepared for selected coastal stretches. Those investments which will inform effective coastal management solutions to guide ICZM Plan preparation will be taken up for piloting/demonstration purposes during Phase I of this Multi-Phase Program. Investments proposed by the States/UTs include mangrove afforestation / shelter beds, waste management in the villages and towns in the watersheds of major rivers leading to the polluted coastal stretches, pollution monitoring activities, preparation of ICZM Plans, institutional development and capacity building, integrated farming mainly; saline agriculture and other demonstrations, embankment strengthening etc. The project investments or locations are not finalized yet. Considering the nature and spread of project activities, Safeguards Category is considered as “A” as per the World Bank’s Safeguards Policy OP 4.01 Environmental Assessment; and hence an ESMF has been prepared by the borrower. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 2 1.1.2 Environmental Characteristics of the Project Location India’s Coastal and Ocean Resources are rich in biodiversity; crucial for growth, food production and to mitigate risks due to climate change. Wide range of ecosystems including mangroves, seagrass beds, salt marshes, coral reefs, wetlands, lagoons, estuaries and other important coastal and marine habitats dot the coast. This coastal strip also houses 1093 small and big beaches. Areas falling under Coastal Regulation Zone (CRZ-I) are ecologically sensitive ecosystems, habitats, and geomorphological features. Coastal ecosystem spanning over 7800 sq km includes corals (1400.92 sqkm), seagrass beds (516.6 sq km), saltmarshes (465.75 sq km), turtle nesting ground (184.87 sq km) and horseshoe crab habitats (72.35 sq km) among the few. Mangroves extending over 5,403.39 sq km can break up storm waves that can exceed 4 m in height during cyclones. Further mangroves double up as habitat for 4,011 species including 920 plants and 3,091 animal species. Geomorphological features along India’s coasts include sand dunes and mudflats accounting for 5,868 sq km, Marine Protected Areas and the Coastal Reserved Forest of 12,800 sq km equivalent to around 5 percent of the territorial waters. CRZ notification has also identified 12 Critically Vulnerable Coastal Areas (CVCAs) along the coast; including magnificent wetlands. Coastal and marine areas are known to have higher potential to sequester carbon than land-based sources - equivalent to 0.2 Gt /year.6 The fragile yet highly productive coastal ecosystems of India are under increasing demand due to rapid urbanization and development needs. Coastal India best exemplifies the ‘Development versus Environment’ conundrum. This area of interaction between the terrestrial and marine process faces a high concentration of population, exploitation of renewable and non-renewable natural resources, solid waste, discharge of industrial effluents and municipal sewage from upland sources, marine plastic, and oil pollution. Due to the aggressive development, it witnessed over the past half-century, today; India’s 7517km coastline hosts 14.2 percent of its total population distributed in 78 districts of 9 States and 2 UTs. Coastal development in India is best explained by the existence of a large number of coastal cities, including three megacities of the global south; namely; Mumbai, Kolkata, and Chennai, 13 Major and 46 minor ports and associated economic hubs, 1511 marine fish landing centers and dedicated fishing ports. Change in landuses to accommodate industrialization, urban uses, fishing harbors, and recreational activities cause altercations along the water edge with resultant erosion/accretion. Various landuses and activities are vying for coastal space with resultant degradation of coastal zones and associated ecosystems. Degradation and fragmentation of coastal ecosystems have negative implications for coastal communities who are dependent on these for their livelihoods. ENCORE Program seeks to assist the Government of India in enhancing coastal resource efficiency and resilience, by building collective capacity (including communities and 6 All numbers quoted are from National Coastal Mission Document, prepared by Ministry of Environment, Forests and Climate Change, Government of India Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 3 decentralized governance) to leverage integrated coastal management approaches. It draws from the experience of the ongoing World Bank supported ICZMP (P097985) and recognizes the link between poverty and adaptation with coastal conservation. 1.1.3 Key Environment and Social Issues The project design of ENCORE subsumes good environmental and social management. It is designed to promote the best environmental and social practices for the coastal space and has an inbuilt planning component; with a strong base on studies and research. ICZM Plan is an essential pre-requisite to coastal planning as envisaged in ENCORE. Key subprojects will be identified on the basis of ICZM Plans and phased later in the implementation process. Those activities which are unavoidable in the coastal space; and are most beneficial to the environment are phased for immediate implementation. Project activities considered relate to improving the coastal environment; leveraging the concepts of resource efficiency. ICZM Plans would be prepared for selected coastal stretches. Those investments which will inform effective coastal management solutions to guide ICZM Plan preparation will be taken up for piloting/demonstration purposes during MPA Phase I. Though the siting of subprojects is taken care of by comprehensive ICZM Planning which is a prelude to the subproject preparation and implementation in the coastal zone, environmental impacts may be expected in case the subprojects are designed without adequate care. Environmental impacts on sensitive areas though meager may include those due to change in landuse in or near environmentally sensitive coastal areas and impacts on environmental quality due to construction and related activities. The project will cause general construction stage impacts which include (i) increase in noise, dust, impacts on air quality or safety risks due to poor construction methods and inadequate operation and maintenance (O&M) of facilities; (ii) temporary water quality impacts resulting from possible drainage and sewage pollution; (iii) impacts related to movement of vehicles including increased congestion, and conflicts with pedestrian movements; iv) hindered access/temporary changes in access to, and the use of, public spaces during construction/excavation works; and (v) public health risks due to improper waste/debris, sludge, excavated silt/muck management, or lack of attention to labor management. Similarly, with project investments expected to spread along India’s entire coast, including island territories, it is likely that some locations may have the presence of the indigenous population. No large scale significant or irreversible social impacts are envisaged. No private land acquisition is envisaged under the project. Mangrove plantations and small infrastructure in villages will be carried out on public land. Rehabilitation of assets will be in-situ and will not require any additional land. However, there are chances of encroachment of public land. During the construction phase, the influx of large numbers of migrant workers in the project area is also not envisaged as assets to be created will be small. Mangrove plantations and rehabilitation work will be carried out in the local Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 4 community. At the same time, the Project will benefit the community in general. However, inclusion and equity issues may remain a concern in accessing the benefits of the project. Potential issues linked to temporary project induced labor influx may be applicable in case the contractor decides to bring laborers from a location away from the Project area. 1.2 Need for an Environmental and Social Management Framework The proposed financing mechanism of the World Bank (Investment Project Financing (IPF with DLIs)) for ENCORE requires the application of World Bank safeguard policies for the project. ESMF7 is an instrument that examines the issues and impacts associated when a project consists of a program and/or series of sub-projects, and the impacts cannot be determined until the program or sub-project details have been identified. Depending on the nature and location, the project initiatives such as coastal protection measures waste management, development of infrastructure facilities for livelihood support are likely to result in positive and negative impacts on the project area during their construction and O&M phases. These impacts would assume importance when the project locations are in proximity to sensitive areas. Hence, there is a need for systematic safeguards management with a pre-defined frameworkk for risk mitigation. As all project locations and activities are not finalized, in order to identify and manage associated environmental risks, it is required to prepare an ESMF for the project. The ESMF would also draw from the past experience of environmental safeguards management as part of the implementation of the earlier World Bank-funded ICZMP project in three Coastal States of Odisha, West Bengal, and Gujarat and thus outlines well-informed mitigation measures and procedures for effective environmental management and safeguards. 1.3 Overview of the Environmental and Social Assessment and Framework 1.3.1 Purpose of the ESMF ESMF is used as a safeguards instrument when a project consists of a program and/or series of sub-projects, and the impacts cannot be determined until the program or sub- project details have been identified. ESMF manages potential adverse impacts through a guide consisting of a set of methodologies, procedures and measures to facilitate adequate environmental management (risk management and impacts) related to the 7 As per WB policy 4.01, an ESMF is an instrument that examines the issues and impacts associated when a project consists of a program and/or series of sub-projects, and the impacts cannot be determined until the program or sub-project details have been identified. The ESMF sets out the principles, rules, guidelines and procedures to assess the environmental and social impacts. It contains measures and plans to reduce, mitigate and/or offset adverse impacts and enhance positive impacts, provisions for estimating and budgeting the costs of such measures, and information on the agency or agencies responsible for addressing project impacts Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 5 works financed under the project and whose specific location is unknown or may change during project implementation. The purpose of the ESMF is to describe a framework or a step-wise process for the management of the environmental issues including: (i) procedures for screening the environmental aspects related to the programs, (ii) identification of impacts, regulatory mechanisms and management/mitigation measures, (iii) details on the institutional roles and responsibilities for environmental management (including contract provisions and budget), (iii) strategy and plan for capacity building of key stakeholders, (iv) plan for monitoring the implementation of environmental safeguards, (v) strategy for public consultation. Typically, ESMF includes the following: 1. Brief description of project components including description of type of activities eligible for financing, 2. Operating requirements (diagnosis of legal and institutional framework, applicable safeguards), 3. Environmental/social baseline at national/state level, 4. ESMF screening procedures (criteria, process, environmental and social due diligence process, EA/ESMP documentation), 5. Implementation arrangements, 6. Public consultation and disclosure process/procedures, 7. Environmental mitigation measures, 8. Monitoring and reporting arrangements, 9. Training and capacity building recommendations, 10. Various Annexures: Guidelines, Indicative ESMPs, Monitoring Formats, etc. 1.3.2 The ESMF process The ESMF is prepared based on the type of subprojects and activities which are expected and probable impacts considering the activities and project locations. It also considers the existing institutional set up for safeguards management and suggests improvements/additions required to follow the ESMF process. ESMF outlines the process to be adopted during each stage in the project cycle, to ensure the preparation of adequate guidance for safeguards management based on the level of impacts and to agree and follow these during the implementation and Operation and maintenances stages. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 6 1.3.3 Revision/Modification of the ESMF The ESMF is a ‘live document’ enabling revision, as and when necessary to incorporate the changing project scenario. At a later date, with changing project contours and on- field necessities; it may deem necessary to incorporate certain provisions in the ESMF. In case of any such additional requirement or need for change in the future, it should be assessed, and appropriate management measures incorporated into the ESMF. Unexpected situations and/or changes in the project or sub-component design would, therefore, be assessed and appropriate management measures will be incorporated by updating this ESMF. Such revisions will also cover and update any changes/modifications introduced in the legal/regulatory regime of the country/ state. Also, based on the experience of application and implementation of this framework, the provisions and procedures would be updated, as appropriate in consultation with the World Bank and the implementing agencies/departments. 1.3.4 Structure of the ESMF Report ESMF for ENCORE Program is presented in two Volumes; Volume I and Volume II. The structure of the document is as follows: Volume I Chapter 1 is the Introductory Chapter; describing ENCORE Program, its components and the need for a framework approach for environmental and social management, Chapter 2 presents the detailed Baseline and Assessment of Environmental and Social characteristics of coastal India; the program region, Chapter 3 presents the Regulatory Framework for the project; including National, State, and local level regulations and policies in addition to applicable World Bank Safeguard policies, Chapter 4 is the Assessment of Probable Impacts due to Subprojects, Chapter 5 presents the ESMF for this project, proposed screening framework for categorization of projects, process for carrying out subproject environmental assessment, and preparation of ESMPs and monitoring plan, Chapter 6 presents the Resettlement Policy Framework, Chapter 7 presents the Indigenous Peoples Planning Framework which would be applicable in case of subprojects in locations with the presence of Indigenous Population, Chapter 8 is the Gender Action Plan for the project, Chapter 9 presents the Labor Management Framework, Chapter 10 identifies the institutional mechanism and its budgetary requirements for implementing the ESMF, and Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 7 Chapter 11 details the Grievance Redress Mechanism, Consultations and Information Disclosure for ESMF and Subprojects. Volume II a) Documentation formats to be used for screening of projects b) Sample terms of references, for Impact Assessment and Specialists to manage ESMF and for auditing compliance to ESMF c) Guidance materials for licenses, permits, clearances under various regulations, site selection, public consultation and consensus, indicative environmental and social management plans and monitoring plans for typical types of projects, grievance management. It also presents a comprehensive set of Environmental Codes of Practices for guiding various project types. This Report is the Volume I of ESMF for the ENCORE Program. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 8 CHAPTER 2. ENVIRONMENTAL AND SOCIAL ASSESSMENT OF COASTAL INDIA The baseline environmental and social data has been collated from available secondary sources including the Census of India, Central and State Pollution Control Board (CPCB), MoEFCC, India Meteorological Department, various studies and publications. This section describes the baseline environmental characteristics of coastal India in terms of Physiography, socio- economic characteristics, coastal and marine ecosystems, vulnerable coastal resources, industries and infrastructure at the coast, natural disasters and climate change, existing institutional set up to manage the coast and science and information available for coastal management. Detailed description of each of the participating coastal state/UT in terms of demography, administrative divisions, natural resources, sensitive coastal land mass and features, archaeology, heritage, tourism, and natural disasters, is presented in Annexure 1, while overall baseline description for the country is included in brief in Annexure II. 2.1 Geographic Location The Indian sub-continent is mostly situated on the Indian Plate in south-central Asia projecting southwards as a peninsula into the Indian Ocean from the Himalayas. India is the largest country in the Indian sub-continent and the seventh-largest country in the world. India lies completely in the northern hemisphere with the mainland extending between latitudes 8° 4' and 37° 6' north and longitudes 68° 7' and 97° 25' east. From north to south, the country extends to about 3,214 km while it is about 2,933 km from east to west. It covers 32,87,263 sq. km, extending from the snow-covered Himalayan heights to the tropical rain forests of the south. There are two island territories – the Andaman and Nicobar Islands in the Bay of Bengal and the Lakshadweep in the Arabian Sea. The country has a land frontier of about 15,200 km while the total length of the coastline of the mainland and its island territories is 7,516.6 km. 2.2 Physical Characteristics The physical characteristics of coastal India can be explained well only by discussing its evolution during the geological time scale. The origin of Indian Subcontinent dates to 180 million years back with the breakup of Pangaea, the supercontinent into Gondwana and Laurasia as a consequence of plate tectonic movement which started about 125 million years ago. During the Upper Cretaceous of the geological time scale, the north-moving Indo- Australian plate was moving at about 15 cm per year. About 50 million years ago, the fast- moving Indo-Australian plate (a fragment of Gondwana), completely closed the Tethys Ocean and began colliding with the Eurasian plate. Since both plates were composed of low-density continental crust, they were thrust faulted and folded into a mountain; the present-day Himalayas (Figure 2.1). Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 9 Figure 2.1: a)Temporal drift of the Indian Plate before its collision with Asia (Eurasian Plate), b) Time sequence of 3-D views of mantle convection and drifting continents Significant tectonic alterations are observable along the Indian coast; the geomorphology of the west coast is different from the east coast. Much of the west coast falls in Dharwar Craton with rocky features whereas the east coast is tectonically East Coast Mobile belt, mainly made up of the deltaic formation from the rivers of Peninsular India. The southern part of the Indian coastline is termed as “Southern Granulite” separated from Dharwar Craton by Bhavani– Palghat Mobile Belt. Furthermore, the Gujarat coast (and Rann of Kachchh) is considered as the upliftment of the shallow region of the Arabian Sea. The coast along the Indian mainland comprises nearly 43 percent sandy beaches, 11 percent rocky coast with cliffs, and 46 percent mudflats with a marshy environment. Some of the beaches regain their original profiles by the months of March/April annually. Nearly half of the remaining beaches which do not regain their original shape over an annual cycle undergo net erosion. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 10 2.2.1 Continental Shelf and slope The continental shelf8 extends seaward from the shore with an average gradient of 1 in 500. Its outward limit is set where the gradient increases to about 1 in 20 on an average to form the continental slope increasing with depth until the deep-sea bottom. The shelf has an average width of 65km. The demarcation between the shelf and slope is based on the break-in-slope as one examines a vertical cross-section of the sea bottom from the shore outward. The average depth at the shelf break is about 130m. Being a highly productive zone, most of the world’s fisheries are located on the continental shelf. The continental slope averages about 400m vertically from the shelf to the deep-sea bottom, but in some places can extend as much as 9000m vertically, in relatively short horizontal distance. The continental slope is considerably steeper than the slope from landward to coastal hinterland. The material in the slope is predominantly mud, with some occasional rock outcrops. Figure 2.2: Continental shelf and slope along the Indian coast The west coast of India has a seafront extending from Cape Comorin in the south to Rann of Kachchh in the north. The continental shelf of India is more prominent along the west coast compared to the east coast. A large-scale turbulence that involves upwelling and wind-driven effects on the south-west coast of India facing the Arabian Sea contributes to this region being one of the most productive fishing grounds in the world. About three-fourths of the Indian seafood production is accounted for from the west coast. The continental shelf along the east coast is narrow with an exception in the head Bay region, whereas along the west coast, the width of the shelf varies from about 88 A continental shelf is a portion of a continent that is submerged under an area of relatively shallow water known as a shelf sea. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 11 340 km in the north to less than about 60 km in the south (Figure 2.2). The bathymetry map for the Indian coast is given in Figure 2.3. Figure 2.3: Depth contour map for the Indian coast 2.2.2 Sediment Transport The sediment movement in the coastal region is a natural process accounted for by currents. Rivers are identified as the major sources of sediment along the Indian coast, among which the Ganges and Brahmaputra contributes a major share of suspended sediments to the Bay of Bengal, and the Indus to the Arabian Sea. Sediment discharge through the Indian rivers into the sea is estimated to be about 1.2 × 1012 kg/yr. Deposits in the gulf, tidal marshes, bays, beach deposits, and aeolian inland transports are found to be the primary sinks for sediments moving along the Indian coast. Several researchers have worked on the sediment transport mechanisms and estimation of budgets. The studies revealed that sediment transportation along coastal Tamil Nadu, particularly at the southern tip of India varies from 82000 to 40000 cubic meters towards the north and west. Similarly, for the Visakhapatnam coast, it varies from 0.4 to 0.6 million m3/yr. Previous studies reveal that sediment transport of about 1670 million tons/yr occurred from the Ganges River into the Bay of Bengal during the year of 1983. The annual gross sediment transport rate is high (1.5 x 106 m3 to 2.0 x 106 m3) along the coasts of north Kerala, north Karnataka, and south Gujarat. The annual net transport is towards the south along Karnataka and north Kerala coasts. The Maharashtra coast experiences a negligible quantity of annual net transport. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 12 2.3 Climate The climate of India can broadly be classified as tropical monsoon; the entire country has a tropical climate marked by relatively high temperatures and dry winters. There are four seasons: • winter (December-February) • summer (March-June) • south-west monsoon season (June-September) • post-monsoon season (October-November) 2.4 Geology and Soils The various types of soil found in India include Alluvial soil, Laterite soil, Red soil, Black soil, Desert soil, and Mountain soil. The Indian Council of Agricultural Research (ICAR) divides the Indian soils into eight major groups. (i). Alluvial Soils, (ii). Black Soils, (iii). Red Soils, (iv). Laterite Soils, (v). Forest and Mountain Soils, (vi). Arid and Desert Soils, (vii). Saline and Alkaline Soils and (viii). Peaty and Marshy Soils. Figure 2.4: Geological Map of Coastal India 9 9 P. R. Reddy, N. Venkateswarlu, P. Koteswara Rao and A. S. S. S. R. S. Prasad, Crustal structure of Peninsular Shield, India from DSS studies. Current Science, Dec 1999 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 13 2.5 Hydrology The main source of fresh water in the coastal regions of India is either surface water or groundwater. As there has been a rapid increase in the population density of the coastal regions, freshwater resources are placed on a stressed limit and consequently, several areas are facing scarcity. Salinity intrusion in surface and groundwater sources is a pressing problem in coastal areas. Since the demand for the surface water sources are ever-increasing, the sustainable management of the resource necessary. Source: Central Ground Water Board, Government of India Figure 2.5: Hydrogeological Map of India Coastal aquifers occur both in unconfined and confined conditions and belong to unconsolidated sediments of Quaternary and Upper Tertiary age, deposited under various sedimentary environments. The Cenozoic sedimentary formations constitute the regionally extensive coastal aquifers in Malabar and Coromandel coasts (artesian aquifers encountered down to a depth of 400 m) and coastal fringes in Kachchh and Saurashtra. Alluvial and Deccan Trap formations also form part of west coast aquifers. In eastern coasts, the coastal belts constitute a narrow elongated crescent-shaped area, formed in the outfall regions of the major rivers like Mahanadi, Godavari, etc., where the groundwater is saline down to a depth of 100- 135 meters. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 14 2.6 Rivers and Estuaries A network of 14 major, 44 medium and numerous small rivers criss-cross the coast of India. The largest delta in the world is formed by the combination of Ganga, Brahmaputra and Meghna lies between India and Bangladesh. Rivers as they approach the sea form estuaries. An estuary is a semi-enclosed coastal body of water, which has a free connection with the open sea and within which seawater is measurably diluted with freshwater derived from ‘land drainage’. Estuaries depend upon fresh-water flow from upland rivers in order to maintain their characteristic processes. The following section describes some of the important estuarine systems in India. 2.6.1 Hooghly estuarine system The Hooghly estuary, the first deltaic offshoot of the Ganges is a coastal plain estuary and is associated with the world’s largest mangrove forest, the Sundarbans. It is one of the major estuaries of the Ganges, the largest as well as the longest river of the Indian subcontinent. It forms part of the world's largest delta, the Ganges-Brahmaputra delta, which lies partly in Bangladesh and India. This low-lying fertile plain is one of the world's most densely populated areas. Figure 2.6: The major estuaries along the coast of India The breadth at the mouth is 25 km (with cross sectional area of 156250 km 2) which decreases to 6 km at the head end10. Sagar Island, the largest island of the Sundarbans, is positioned at the mouth of the estuary and bifurcates it into two channels, the western channel is retained as Hooghly and eastern is named as Mooriganga. Mixing zones of the estuary extend up to Diamond harbor, about 80 km upstream. It receives 4 small 10 http://nio.org/userfiles/file/events/P_Mukhopadhyay.pdf Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 15 rivers: Damodar and Rupnarayan at its head and Haldi and Rasulpur in the middle. Geomorphologically, it can be classified as coastal plain estuary. The important morphotypes are tidal islands, tidal bars, beaches, mudflats, sandflats, coastal dunes, creeks, inlets, and mangrove swamp. 2.6.2 Estuaries of Peninsular India Peninsular India is drained by five major river estuarine systems on the east coast: Mahanadi, Godavari, Krishna, Penneru, and Cauvery. The estuaries on the west coast are smaller compared to the major east coast estuaries. Estuaries of the East Coast Mahanadi Estuarine system The Mahanadi estuarine system is one of the major estuaries in India and the largest estuary in Orissa 11. It is spread over a wide area in the Cuttack and Puri districts for about 165 km of the coastline along the Bay of Bengal from the northern end of Hukitola lake in the north in Cuttack district, to the north-eastern extremity of Chilika Lake in the south in Puri District. Mahanadi divides into two main distributaries, Devi River and Mahanadi proper. Other tributaries such as Kathajodi, Kuakhaee, Daya, Bhargavi, and others arise from this. The main river opens into the Bay of Bengal at Paradeep in Cuttack District. Devi River opens into the sea near Astaranga in Puri District. Some tributaries meet the main river, Devi River and Chilika Lagoon and the other tributaries directly open into Hukitola Lake, which is 15 kms away from the main river mouth at Paradeep. The entire area is full of mangrove vegetation together with mudflats traversed by a network of tidal creeks except some areas like Paradeep mouth region and Astaranga mouth region which have sandy shoreline. Godavari estuarine system Godavari is the largest of Indian peninsular rivers. Upon reaching the eastern coastal plain, downstream of the dam at Dowleswaram (near Rajahmundry), the river divides into two main distributaries Gautami and Vasishta that give rise to a sprawling estuarine deltaic system fringed with tidal creeks and dense mangrove forests before reaching the Bay of Bengal. Along the delta, the position and orientation of ancient beach ridges reveal sea-level fluctuations and delta progradation. At the river mouth, circulation pattern changes rapidly with tide, local winds, and sea breeze. Littoral current that is directed up the coast (northerly long-shore current) during pre-monsoon and monsoon causes erosion of the bottom that results in formation and accretion of the sand spit (Godavari point) and the northwest-trending sandbar. The enclosed Kakinada Bay measuring 150 km2 is a stratified water body in dry season when the salinity can go up to 34 psu and pH to 8.3. The Godavari estuary is well mixed with the tidal effect dominating in the lean season. 11 http://faunaofindia.nic.in/PDFVolumes/ess/003/index.pdf Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 16 Krishna River Estuarine system Krishna estuary is about 45 km in length and the estuarine system of Krishna River covers an area of about 320 sq.km with all its four distributaries12. The tidal portion extends up to 39 km upstream near Penumudi in the river. It is essentially shallow; with a mean width of 1.2 km and an average depth of 5-7 m. The estuary has a well- developed sandy coast that experiences long-shore drift, build-up spits and barriers across river mouths creating a coastal lagoon. It is a meso-tidal estuary with a tidal range of 2-3 in and strong tidal current of 1.2 m sec-1. Dissolved and particulate loads of the Krishna River are derived from a variety of igneous, metamorphic and sedimentary rocks in their catchment areas. In addition to this, the estuarine system is fringed with extensive mangrove vegetation. Cauvery River Estuarine system The Cauvery Estuary, located along the east coast of India, is a part of the Cauvery River basin, encompassing about 80,000 ha. The upper reaches of the estuary start from Grand Anaicut (a dam near Trichy), where it bifurcates into two large branches, the Coleroon and Cauvery. Below the Anaicut, the river flows in an almost flat plain, having a gentle slope from west to east. The formation of this estuary has taken place over the surface of an area that emerged from the sea. The emergence of this land caused the river to drain further east, resulting in the formation of the estuary. It is a vertically well-mixed estuary with a shallow average depth of less than 1 m, a minimum width of 50 m, and a maximum width of 1,500 m. From the Coleroon, the sea faces run straight southward for about 129 km to Point Calimere, where it makes a right-angled bend and runs west for 48 km. The northern part of the eastern face of the estuary is heavily affected by erosional processes and destruction due to the northeast monsoons. In the Cauvery estuary, the rocks range in age from Archean crystallines to quaternary sediments. The climate of the region is semi-arid where northeast monsoons dominate. Areas surrounding the estuary are dominated by agricultural use. West Coast Estuaries The West coast of India stretches from Cape Comorin (8°N) in the south to Kuchchh (22°N) in the north. The Narmada (watershed area: ~105 km2) and Tapti (~104 km2) are the two major rivers estuaries in this region along with numerous small rivers, flowing into the eastern Arabian Sea. The sediment load by westward flowing rivers on the Indian subcontinent is 9 x 1012 g yr-1, excluding the Indus (Central Water Commission (CWC), 2012) 13. Information on land use patterns within individual river catchments is sparse for this region. 12 http://nopr.niscair.res.in/bitstream/123456789/10019/1/IJMS%2039(2)%20248-256.pdf 13 CWC, 2012. Integrated Hydrological Data Book (Non–classified river basins). Ministry of Water Resources, Hydrological Data Directorate Information systems Organization Water Planning & Project Wing, Central Water Commission, New Delhi, 680 pp. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 17 Estuaries in Gujarat In the context of Gujarat, estuaries are formed mainly along the eastern bank of the Gulf of Khambhat and South Gujarat coasts. A total of nine rivers drain their water to form estuaries near the coast. These rivers include (from north to south): Sabarmati, Mahi, Narmada, Kim, Tapi, Purna, Ambika, Auranga and Daman Ganga. These estuaries are under considerable tidal influence that generally increases northward. The spring tidal range in some is as high as 5.6 m in the mouth region of the estuary. High tidal influence generates strong tidal currents with current speeds exceeding 1 m s-1 during spring tides, which signify good mixing and flushing of estuaries. Estuaries in Maharashtra Maharashtra state has about 720 km long indented coastline, which is marked by the presence of major estuaries and narrow creeks. It comprises the coastal districts of Thane, Raigad, Greater Bombay, Ratnagiri, and Sindhudurg. The tidal range (2.5 to 5 m) influenced the mouth segment of the estuaries/creeks along the coast by providing good potential for dilution during flood tide for the dispersal of contaminants entering this zone. Estuaries in Goa The Mandovi-Zuari estuarine complex situated at latitude 15°25' - 15°30'N and longitude 73°45' - 73°59'E is one of the unique tropical estuarine systems along the west coast of India. The influence of southwest monsoon results in dramatic changes in the overall function of these estuarine ecosystems. The estuarine flow propagated by the tide (semi-diurnal with a range of 0.2 – 2 m), at the mouth, becomes the sole driving force of transport into the estuarine network. This initiates different hydrodynamic processes between dry (non-monsoon) and wet (monsoon) seasons, resulting in the formation of homogenous, salt-wedge and partially mixed estuaries during pre- monsoon (February – May), monsoon (June – September) and post-monsoon (October – January) seasons respectively 14. Estuaries in Karnataka There are 26 estuaries with more than 70,000 Ha. of water-spread area and 8000 Ha of brackish water area, making the three coastal districts of Karnataka very rich in marine, estuarine and riverine biodiversity. The tides travel long distances, even 20-30 kms interior through many of these estuaries, making the saline aquatic habitat suitable for several marine and estuarine organisms. Among these, the Kali and the Aghanashini river estuaries in Uttara Kannada district are the two major estuaries in Karnataka and known for their rich mangrove and aquatic biodiversity. Estuaries in Kerala Kerala has as many as 32 small to medium estuaries, sprawling along the entire coastal length play a crucial role in the socio-economic development of the state, owing to their 14 Qasim, S.Z., 2003. Indian Estuaries. Allied Publishers Pvt. Ltd., New Delhi. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 18 potentialities for aquaculture, navigation, commercial fishery, recreation, and tourism. The major estuaries of the state are Ashtamudi, Korapuzha, Beypore, and Periyar. Cochin Backwaters: A chain of brackish lagoons and lakes lying parallel to the Malabar Coast in Kerala are called Backwaters of Kerala or the Cochin Estuary. This is the largest estuarine system along the west coast of India. The estuary is characterized by its major axis lying parallel to the coastline, with several small islands and interconnected waterways, and it covers a surface area of about 300 sq.km. The width of the estuary varies from 450 m to 4 km and the depths range from 15 m at Cochin inlet to 3 m near the head with an average depth of 1.5 m (depths are reduced to chart da- 15 tum). Tides in the estuary are mixed, predominantly semi-diurnal type with an average tidal range of 1 m15. 2.7 The Coast of India The Indian subcontinent is a peninsular projection into the Indian Ocean. The East Coast is characterized by a large number of deltas built by the rivers flowing into the Bay of Bengal while the west coast is often rocky with pocket beaches interlaced with fast-flowing rivers forming estuaries flowing into the Arabian Sea. A summary of the key features of the Indian east and west coasts is presented in Table 2.1 below. Table 2.1: Key Characteristics of the West and East Coasts Aspects West coast East coast Length 3495 km 2620 km Vegetation Mostly deciduous Fertile Deltaic Region Supports the largest stand of mangroves and seagrass meadows Geomorphology Mainly Coast of submergence East coast is an emergent coast (except Malabar) Environmental Coastal upwelling process Heavy freshwater discharge Processes Population coastal 8,74,88,379 10,24,04,145 districts Population Density 119/km2 158/km2 Vulnerability Erosion, pollution, storm surge, Tropical cyclone, erosion, sea level rise, coastal flooding, pollution, sea level rise, coastal population density, Landuse flooding, population density, and Land Classification LULC change (LULC) change etc The Western Coastal Plain is a narrow strip of land between the Western Ghats and the Arabian Sea, ranging from 50 to 100 km in width. It starts from Gujarat in the north and extends through Maharashtra, Goa, Karnataka, and Kerala. The rivers along the west coast mostly originate in 15 Qasim, S. Z. and Gopinathan, C. K.: Tidal cycles and the environmental features of Cochin backwater (a tropical estuary), P. Indian Acad. Sci., Bangalore, 1969. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 19 the Western Ghats and are fast-flowing. Major rivers flowing into the sea are the Tapi, Narmada, Mandovi, and Zuari. West Coast Rivers form estuaries and carry a limited amount of freshwater and sediments compared to the East Coast Rivers (0.3x1012 m3 y-1 or about 1/3rd of that by Ganges and Brahmaputra discharges; Shankar and Shetye, 1997). Vegetation in this coastal area is mostly deciduous, but the moist forests of the Malabar Coast constitute a unique eco-region. The Coastal Plain in the eastern part of the country is a wide stretch of land lying between the Eastern Ghats and the Bay of Bengal. The width of the coastal plain varies between 100 and 130 km. The coast stretches from Tamil Nadu in the south to West Bengal in the east. The Ganges, Mahanadi, Godavari, Krishna and Kaveri rivers drain these plains. The region receives both the northeast monsoon and southwest monsoon rains. Annual rainfall in this region ranges between 1,000 and 3,000 mm. 2.8 Islands India has 1382 offshore Islands including 289 islands rocks or rocky islets. The size of the islands ranges from 0.0001 to 1250.25 km2. Apart from the islands along the mainland coast, India has two island territories viz., Andaman and Nicobar Groups of Islands and Lakshadweep islands. Some of the islands have been inhabited by aboriginals (e.g. Nancowry and Katchall islands of Andaman and Nicobar Islands). The total number of offshore islands along the mainland of India is 514 of which 421 are present along the west coast and 93 islands are present along the east coast. States/Union territories on the west coast of India which have islands are Gujarat (144 islands), Daman & Diu (9), Maharashtra (124), Goa (43), Karnataka (94) and Kerala (7). The islands on the east coast are found along the coast of Odisha (11), Tamil Nadu (28), Andhra Pradesh (32) and West Bengal (22). Among the mainland islands, 22.18 percent are inhabited, comprising of 97 islands along the west coast and 17 on the east coast. A total of 260 islands (212 on the west coast and 48 on the east coast) are uninhabited. Among the 514 islands, 107 islands (68 on the west coast and 39 on the east coast) are fully protected either as marine national parks, wildlife sanctuaries, reserved forests, protected forests under the Wildlife Protection Act (1972) or Indian Forest Act (1927). About 14 percent of the mainland offshore islands (72 islands) is unprotected but have been reported to have ecologically sensitive areas (ESAs) such as coral reefs, seagrass, mangroves, salt marshes, archaeological sites, etc. 2.9 Extreme Events 2.9.1 Tropical cyclones Cyclone is one of the most devastating weather phenomena over the coastal regions in the world in terms of loss of life and property. The increase in the death toll and property damage due to the cyclones depend on the three major factors such as strong winds, storm surge and floods resulting from heavy rainfall. The coastal states along the eastern and western coasts of India suffer regularly from tropical cyclones (Alam et al. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 20 2003 16) due to the geographical structure, densely populated coastal region, shallow bathymetry, and poor socio-economic conditions. According to a report published by the National Disaster Management Authority (NDMA) of India, 80 percent of the coastal areas are vulnerable to cyclones specifically the East Coast States (ECS) of India (NDMA 2008). The topographic characteristics being exposed to the Bay of Bengal and the bathymetry of the eastern coast make the ECS a naturally vulnerable zone (Dube et al., 1997 17; Dube et al., 2000 18). The formation of cyclones with high intensity is observed as the primary maximum in the post-monsoon season (October to December) and secondary maximum during the pre-monsoon season (April and May). The ratio of the frequency of occurrence of Tropical Cyclones in the Bay of Bengal (BoB) and Arabian Sea (AS) is about 4:1 (Dube et al. 1997). The peak frequency of the formation of cyclones over the North Indian Ocean is in the months of May and November of the year (Mohanty et al. 2010). In Northern Indian Ocean, on average, one severe cyclone is expected to form in November every year, and these generally move westwards to west-north-westwards and strike the Andhra Pradesh or Tamil Nadu coasts of India; and they account for the highest number of natural disaster deaths in India and Bangladesh (Singh et al. 2001). To reduce the impacts, especially to save lives, it is necessary to predict the movement and landfall of cyclones very precisely to enable early warning and evacuation of people likely to be affected. Subsequent to the 1999 Super cyclone that hit Odisha, steps have been taken to improve early warning and prediction. While property damage and crop losses cannot always be avoided, saving lives through early evacuation to safe shelters (cyclone shelters), implementing appropriate building codes, moving power and telephone lines underground, increasing coastal bio shields and applying standard operating procedures (SOP) for relief and response have been made possible through various programmes and projects including the National Cyclone Risk Mitigation Project. 2.9.2 Storm surge During cyclones, storm surges are generated by a combination of meteorological forces of the wind friction and low air pressure due to a storm and oscillate in the period range of a few minutes to a few days. In the ocean, local wind waves can add to the water level, and the storm surge can be amplified by interference with the strictly regular astronomical tides. In addition, wind-driven waves can be superimposed on the storm tide. This rise in sea level can cause severe flooding in coastal areas, particularly when the storm tide coincides with the high tides. 16 Alam, M. M., Hossain, M. A. and Shafee, S., 2003: Frequency of Bay f Bengal cyclonic storms and Depressions crossing different coastal zones, Int. J. Climatol., 23, 1119-1125. 17 Dube, S. K., A. D. Rao, P. C. Sinha, T. S. Murty, and N. Bahulayan (1997), Storm surge in the Bay of Bengal and Arabian Sea: The problem and its prediction, Mausam, 48, 283 –304. 18 Dube, S & Chittibabu, Padala & Rao, A & C. Sinha, P & S. Murty, T. (2000). Sea Levels and Coastal Inundation Due to Tropical Cyclones in Indian Coastal Regions of Andhra and Orissa. Marine Geodesy. 23. 10.1080/01490410050030643. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 21 In the context of Indian coastal regions, the frequency of tropical cyclones is very high in the Bay of Bengal region compared to the Arabian Sea. It would be the high stratification of the Bay of Bengal and riverine discharge in the Bay. From 2010 onwards, the Indian Meteorological Department (IMD) began posting on the annual reviews of tropical cyclones including storm surge on its website. The Indian coast has been classified based on probable maximum storm surge as well as wind speeds into different risk zones. 2.9.3 Tsunami Tsunami waves are considered the most dangerous natural hazard affecting the population of the world living near the coastal belts. With the increasing intensity of economic exploitation of coasts, there is also an increase in socio-economic consequences resulting from the hazardous action of tsunami waves generated from submarine seismic activity and other causes. On 26 December 2004, the countries within the vicinity of the East Indian Ocean experienced the most devastating tsunami in recorded history. This tsunami was triggered by an earthquake of magnitude 9.0 on the Richter scale at 3.4°N, 95.7°E off the coast of Sumatra in the Indonesian Archipelago at 06:29 hrs IST (00:59 hrs GMT). Following the event, India started its own interim tsunami warning center in the first quarter of 2005 to issue tsunami bulletins generated from seismic information. The interim services were succeeded by setting up of a state-of-the-art Indian Tsunami Early Warning System (ITEWS) at the Indian National Centre for Ocean Information Services (INCOIS), Hyderabad, under the Earth System Sciences Organization (ESSO), GoI. The system implemented in phases became a full-fledged 24X7 operational early warning system in October 2007. 2.10 Climate Change and Sea Level Rise Climate change in the oceans occurs in the form of ocean warming, ocean acidification, and sea-level rise. Sea level rise occurs mainly by ocean warming, which causes the thermal expansion of the ocean and melting of glaciers and ice sheets. Besides, other activities such as the construction of dams, alter land-water storage, which also contributes to the sea-level changes. Impacts on the coast occur due to sea-level rise and extreme events, such as storm surges and waves. Sea-level rise causes inundation at the coast, particularly of low-lying areas and adds to the impact of extreme events, including storm surges and waves. The east coast of India is particularly vulnerable due to its low-lying nature and also due to the occurrence of cyclones and storm surges. Even in the context of current cyclone statistics, storm surges will have a greater impact because of the increasing sea level. Moreover, deltaic regions undergo land subsidence, which adds to the sea-level rise. The cumulative effect of these two processes produces a greater impact along the north-eastern coast of India and Bangladesh. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 22 Sea-level rise trends along the Indian coasts As reported in earlier studies (Unnikrishnan et al., 2007 19, INCCA, 2010 20and the second NATCOM, 201221), analysis of long historical tide gauge records along the Indian coasts indicate an average sea level rise trend of 1.3 mm/year during 20th century, except for the deltaic region off the northeast coast, where the observed trends are about 5.00 mm/year, (Unnikrishnan et al., 2007 22). Nandy and Bandyopadhay (2011)23 also found large similar trends in stations along the Hoogly estuary. Unnikrishnan et al. (2015)24, studied Sea-level-rise trends in the north Indian Ocean during historical period using tide-gauge data and recent period with satellite altimeter data show that the rate of sea-level rise has been much higher during the last two decades (1993-2012), which has been estimated to be about 3.2 mm/year, as estimated using satellite altimeter data and available tide-gauge data. These findings are consistent with global estimates of 3.2 mm yr-1 for the period of 1993-2012. However, it is not clear whether the increased sea level rise trend in recent decades is partly caused by aliasing with natural variability or directly caused by global warming. Sea-level-rise trends for stations having the longest records are presented in Table 2.2 below. The trends are corrected for Glacial Isostatic Adjustment (GIA) using the results of the Ice model (Peltier, 2012 25). Table 2.2: Sea Level Rise at Selected Tide Locations Station Period of Number of Trends in GIA Net sea- analysis years of relative Correction level-rise data sea-level (mm yr-1) trend availability rise (mm yr-1 ) (mm yr-1) Mumbai 1878-1993 113 0.77±0.08 -0.31 1.08 Kochi 1939-2007 56 1.45±0.22 -0.36 1.81 Visakhapatnam 1937-2000 53 0.69±0.28 -0.24 0.93 Diamond Harbour (Kolkata) 1948-2010 61 4.61±0.37 -0.35 4.96 19 Unnikrishnan, A.S. and Shankar D. (2007) Are sea-level-rise trends along the coasts of north Indian Ocean coasts consistent with global estimates? Global and Planetary Change, 57, 301-307 20 Indian Network for Climate Change Assessment (INCCA). 2010. Climate Change and India: A 4x4 Assessment - A Sectoral and Regional Analysis for 2030s, Ministry Of environment, Forests and Climate Change, Government of India. (Online) Available at: http://www.indiaenvironmentportal.org.in/files/fin-rpt-incca.pdf. Accessed on: April 2019 21 MOEF, 2012. India. Second National Communication to the United Nations Framework Convention on Climate Change, Government of India. Available at: https://unfccc.int/resource/docs/natc/indnc2.pdf, Accessed on : March 2019 22 Unnikrishnan A.S. 2007. Op.Cit 23 Nandy and Bandopadhyay. 2011. Trends of sea level change in Hoogli estuary, India, Indian Journal of Geo- marine Sciences, Vol 40 (6), December 2011: pp.802-812 24 Alakkat, Unnikrishnan & Gangan, Nidheesh & Lengaigne, Matthieu. (2015). Sea-level-rise trends off the Indian coasts during the last two decades. Current science. 108. 966 -971. 25 Peltier, W. R., Drummond, R., and Roy, K. (2012), Comment on “Ocean mass from GRACE an d glacial isostatic adjustment” by D. P. Chambers et al., J. Geophys. Res., 117, B11403, doi:10.1029/2011JB008967. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 23 The trend-estimation period for Mumbai and Visakhapatnam was restricted up to 1993 and 2000 respectively, due to extensive data gaps at the end of the records. Diamond Harbour record shows a large sea-level-rise trend of about 5.00 mm/year, which is partly attributed to the subsidence of the Indo-Gangetic delta. The rate of subsidence of about 4.00 mm/year has been reported in earlier studies based on sedimentological analysis. Sea-level-rise projections for 2100 Projections of sea level rise have been mostly in the global context and vary according to the scenarios. For the highest emission scenario, RCP 8.5, the likely ranges are 0.45 and 0.82 m for 2100. Location-specific projections are currently not available. However, the fifth assessment report of the IPCC provided regional projections (Church et al., 2013 26). Figure 2.7 shows the observed data from the tide gauge and altimeter for two stations. Legend: Tide Gauge Record (Black), Satellite Altimeter (Red) Figure 2.7: Observed Data: Tide Gauge Record and Satellite Altimeter (a) Mumbai and (b) Diamond Harbour (Kolkata). The points for altimeter data are offshore points. The projections are drawn using for the regional projections for the scenario, RCP4.5 (Church et al., 2013). Dotted lines show the uncertainty limits of the projection. 26 Church, J.A., P.U. Clark, A. Cazenave, J.M. Gregory, S. Jevrejeva, A. Levermann, M.A. Merrifield, G.A. Milne, R.S. Nerem, P.D. Nunn, A.J. Payne, W.T. Pfeffer, D. Stammer and A.S. Unnikrishnan, 2013: Sea Level Change. In: Climate Change 2013: The Physical Science Basis. Contribution of Working Group I to the Fifth Assessment Report of the Intergovernmental Panel on Climate Change [Stocker, T.F., D. Qin, G.-K. Plattner, M. Tignor, S.K. Allen, J. Boschung, A. Nauels, Y. Xia, V. Bex and P.M. Midgley (eds.)]. Cambridge University Press, Cambridge, United Kingdom and New York, NY, USA. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 24 To make regional projections, contributions due to glacial isostatic adjustment, atmospheric loading (due to inverse barometric effects) and redistribution of heat and glacier melt by ocean currents are added to global projections. 2.11 Coastal and Marine Ecosystems Depending on the geomorphology and coastal processes, a variety of ecosystems can be identified along the coast. Most prominent of these are the mangrove wetlands including the Sundarbans (shared between India and Bangladesh) which form the largest single stand of halophytic mangroves, but there are also stretches of sandy beaches and mudflats. The west (Arabian Sea) coast is different from the east (Bay of Bengal) coast. The west coast is largely rocky with many pocket beaches and backwaters while the east coast has a number of large deltas. The two major coastal lagoons are the Chilika and the Pulicat while the Vembanad Kol is located on the west coast. 2.11.1 Coastal Ecosystems There are sixteen types of forests in India (Champion and Seth, 196827) (Figure 2.8) and the ones relevant to the coastal region are the Littoral and Swampy forests (Wet tropical forests), which include the beach forests and the tidal forests or mangrove forests. Figure 2.8: Classification of forest types in India highlighting forest types found in coastal areas According to Champion and Seth (1968), littoral forests consist of evergreen species of varying densities and height, usually associated with mesic habitats. These forests occupy an area of 0.7 million ha along the coast. These forests are mostly in their 27 Champion, H. G. and Seth, S. K. (1968). A Revised Survey of Forest Types of India, Govt. of India Press, New Delhi, p. 404 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 25 developmental stage and are seral in nature; they occur throughout the country, wherever wet and waterlogged conditions prevail. The littoral and tidal forests (mostly mangroves) occur along the coast, the latter being especially associated with deltas of larger rivers. Swamp forests occur in north-east India along major river systems. 2.11.2 Coastal Terrestrial Ecosystems These forests are found in a relatively small area on the east coast, which receives little or no summer rainfall. The forests are low but often dense with hard-leaved evergreen trees in which thorny species predominate. The characteristic species are Memecylon edule and Maba buxifolia. It may be noted that the remaining true tropical dry evergreen forests (those not degraded to thorny scrub types) occur presently in the form of sacred groves or `temple forests' i.e. patches of natural climax forests preserved as a result of religious belief of the local people28,29. 2.11.3 Mangrove Forests and Coastal Wetlands Mangroves are coastal trees or shrubs that are adapted to estuarine or even saline environments. In India, they are of three types: tide-dominated (e.g. Sunderbans, Mahanadi delta), river-dominated (Godavari, Krishna, Pichavaram, Muthupet), drowned river-valley (Gujarat). The actual forest cover in mangrove forests may be much less than the total area of the mangrove wetland as it includes creeks, estuaries, etc. Indian mangroves cover about 6956 km2, with about 57 percent on the east coast, 23 percent on the west coast and about 20 percent in the Andaman and Nicobar Islands30. Indian mangroves are distributed in about 5403 km2 as per the recent study conducted by NCSCM. Major mangrove areas in India include the following: East coast: • West Bengal: Sunderbans • Odisha: Mahanadi delta e.g. Bhitarkanika, Rushikulya • Andhra Pradesh: Coringa – Godavari; Krishna • Puducherry: Ariankuppam • Tamil Nadu: Pichavaram, Muthupet (Cauvery delta) • Island Mangroves (Andaman and Nicobar Islands in the Bay of Bengal) 28 Mani S, Parthasarathy N. (2005). Biodiversity assessment of trees in five inland tropical dry evergreen forest of peninsular India. Systematics and Biodiversity, 3, 1–12. 29 Parthasarathy, N. and R. Karthikeyan, 1997. Plant biodiversity inventory and conservation of two tropical dry evergreen forests on the Coromandel coast, south India. Biodiversity and Conservation 6, 1063±1083 (1997) 30 State of Forest Report, (2015) Forest Survey of India, Ministry of Environment & Forests, Dehradun, India Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 26 West Coast: • Gujarat: Gulf of Kachchh, Gulf of Khambat • Maharashtra: River mouths of Savithri, Dharmtar, Vashisthi, Panvel, Vasai, Thane, Kundalika • Goa: Mandovi and Zuari • Karnataka: Karwar, Kumta, • Kerala: Vembanad Estuary (Thrissur to Alappuzha – Kottayam, including Kochi), Kannur, Kozhikode The mangrove ecosystems of the Sundarban and Bhitarkanika are tide-dominated allochthonous types of mangroves. The tidal range is high with strong bidirectional current as well as the main river channels are funnel-shaped with extensive tidal flats, colonized by mangroves. Coringa mangroves of Andhra Pradesh (Godavari) and Pichavaram-Muthupet mangroves of Tamil Nadu (Cauvery delta) are river-dominated allochthonous type, with characteristic rapid deposition of terrigenous material. Mangroves of Gujarat (Gulf of Kachchh and Khambat) are a peculiarly bedrock valley type, drowned by rising sea levels. The relatively small delta area could be seen at the head of the valley. Carbonate platforms on low energy coasts type of mangroves are present in Andaman and Nicobar Islands and they are slowly accreting due to the accumulation of marl (calcareous) and peat, coral reef or sand. Fringe mangrove growth is luxurious in the shallow water area of these islands. Table 2.3: Extent of Mangroves in India Coast State/ UT Name Mangrove Area (km2) West Coast Gujarat 1339.41 States Maharashtra 307.24 Goa 33.01 Karnataka 16.50 Kerala 20.80 Daman & Diu UT 4.09 East Coast Tamil Nadu 119.13 States Andhra Pradesh 408.02 Odisha 276.37 West Bengal 2206.67 Puducherry UT 4.72 Islands Andaman & Nicobar Islands UT 667.43 Lakshadweep Islands UT ND Total 5403.39 Source: NCSCM 2018 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 27 Figure 2.9: Mangrove Forests of India 2.11.4 Salt Marsh Saltmarsh is a community of organisms dominated by plants that are tolerant of wet, saline soils, generally found in low-lying coastal habitats which are periodically wet and unusually saline to hyper-saline. The term salt marsh summarizes the saline conditions of the habitat as well as the emergent vegetation which dominates it. Plants that grow in salt marshes are thus tolerant of two conditions: salinity and wetness. The Great Rann of Kachchh, is a seasonal salt marsh located partly in the Thar Desert in the Kachchh District of Gujarat, India. During the summer monsoon, the flat desert of salty clay and mudflats, which average 15 meters above sea level, gets filled with standing waters. The greatest extent between the Gulf of Kachchh on the west and the Gulf of Khambhat on the east get united during the monsoon. Although most of the marsh is in protected areas, the habitats are vulnerable to cattle grazing, firewood collection, and salt extraction operations, all of which may involve transportation that disturbs wildlife. There are several wildlife sanctuaries and protected reserves on the Indian side - in the Rann of Kachchh region. 2.12 Marine Ecosystems 2.12.1 Coral Reefs Coral reef is defined as a mound or ridge of living coral organisms, coral skeletons, and calcium carbonate deposits from other organisms such as calcareous algae, mollusks, Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 28 and protozoans. Most coral reefs form in warm, shallow sea waters and rise to or near the surface, generally in the form of a barrier reef, fringing reef or atoll. Coral reefs grow upward from the seafloor as the polyps of new corals cement themselves to the skeletons of those below and in turn, provide support for algae and other organisms whose secretions serve to bind the skeletons together. The resulting structure provides a critical habitat for a wide variety of fish and marine invertebrates. Coral reefs also protect shores against erosion by causing large waves to break and lose some of their force before reaching the land. The total area of coral reefs in India is estimated to be 5,790 sq.km, distributed between four (4) major regions: Lakshadweep, Gulf of Mannar, Gulf of Kachchh, and Andaman and Nicobar Islands. The mainland coast of India has two widely separated areas containing fringing reefs: the Gulf of Kachchh in the northwest, which has some of the most northerly reefs in the world and Palk Bay and Gulf of Mannar in the southeast. There are patches of reef growth on the west coast, e.g. at Malvan (Malvan Coral Reef Sanctuary). Scattered patches of coral have been seen in the intertidal and subtidal areas along the west coast especially at Gaveshani Bank about 100 km offshore from Mangalore, Ratnagiri and Rede Port. 2.12.2 Seagrass Beds Seagrasses are marine flowering plants forming extensive beds or meadows, which can be either monospecific (made up of a single species) or in mixed beds where more than one species coexist. They occur in the infra-tidal and mid-tidal zones of shallow and sheltered localities of sea, gulf, bays, backwaters, and lagoons. Seagrasses are often found in association with coral reef areas, especially in the Palk Bay and Gulf of Mannar (Tamil Nadu), Chilika Lagoon (Odisha) and off the coast of Maharashtra (Malvan). They form a habitat for rare and endangered animals such as marine turtles and dugongs, apart from economically important species of fish and shellfish. 2.12.3 Seaweeds About 770 species of seaweeds are reported to be distributed along the India coast. Of these 184 species are green, 166 are brown and 420 are red algae. The estimated standing stock (wet weight) is about 541,340 Tons. Seaweeds are excellent breeding grounds for marine organisms, and are important as food for humans, feed for animals, fertilizer for plants, and for pharmaceutical purposes. The collection of wild seaweeds by the coastal population has reduced the seaweed cover over the years. Farming of seaweeds has become popular and is livelihood for coastal populations in the Palk Bay and Gulf of Mannar (southeast coast of India)31. 31 Bhatt, JR and E. Vivekanandan, 2013. Coastal and Marine Biodiversity Conservation in India. Regional Symposium on Ecosystem Approaches to Marine Fisheries & Biodiversity, October 27-30, 2013, Kochi Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 29 2.12.4 Sandy Shores: Turtle Nesting Sites India has five of the seven species of known sea turtles. Mass nesting occurs along sandy beaches on the west and east coast. Female turtles come ashore on sandy beaches where they were born, dig a nest and bury their eggs in it. After hatching the turtles find their way back to the sea. The world’s largest Olive Ridley rookery is in Odisha. Some of the important turtle nesting sites in the West and East Coast of India are as in Table 2.4. The sites for nesting are reported as shifting due to various reasons such as shifting of river mouth and loss of beaches. Table 2.4: Major turtle nesting sites in India Location Species Confirmed Nesting beaches nesting West Green, Olive Green and Gujarat: Mandavi in Kachchh, Sea beach between Okay Coast Ridley, and Olive and OkhaMadhi, Bhaidar, Beyt, Nora and Chank Islands. Leatherback Ridley Maharashtra: Gorai, Khim, Manowrie, and Versova Goa: Morjim in North Goa, Galgibag and Agonda in South Goa East Olive Olive Tamil Nadu: Gulf of Mannar, Point Calimere, and 50 km Coast Ridley, Ridley coastline south of Madras. Green Andhra Pradesh: Kakinada coast, sea beach near the Hawksbill, mouth of Godavari and Krishna and near Visakhapatnam Leatherback, Odisha: All along the coast south of Dhamra river mouth. and Two mass nesting beaches at Gahirimatha and Loggerhead Rushikulya West Bengal: In the sandy beaches of Sunderbans 2.12.5 Intertidal Zone- Mudflats and Horseshoe Crab Habitats Mudflats are usually found in backwaters, estuaries and mangrove areas formed from silt brought by rivers, tides, and gentle wind waves. Mudflats are not vegetated but are important coastal systems subjected to tidal flooding and exposed during ebb tides, i.e. the flat is submerged and exposed approximately twice daily. They are extremely important as feeding grounds for aquatic birds as well as important habitats for certain species of crustaceans, molluscs, and fish. They are found in sheltered areas such as bays, lagoons, and estuaries. Horseshoe crabs (family Limulidae, order Xiphosura or Xiphosurida) are arthropods that live primarily in and around shallow ocean waters on soft sandy or muddy bottoms. They are found only on the eastern coasts of the world. Tachypleus gigas (Muller) and Carcinoscorpius rotundicauda (Latreille) are found within Indian limits, the former on the north-east coast of Odisha (especially Balramgari) and the latter in the Sunderbans area of West Bengal. Complete information on this is not available and the International Union for Conservation of Nature (IUCN) has declared it a ‘data deficient category’. The vernacular names of horseshoe crabs are Lakshanpatia (West Bengal), Ramlekhani and Ramalakhana (Orissa), Kuthirailata njantu / Sanyasi Njandu (Tamil, Malayalam). Used locally for medicinal purposes (rheumatic disease), mostly in the homeopathy Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 30 branch of medicine. The blood of this variety of crabs, which turns blue on contact with air has copper and is found useful for treating osteoporosis, diabetes, and cancer. The animals generally occur in pairs. Mangroves and mudflats are suitable habitat for Carcinoscorpius rotundicuda while sandy beaches are suitable for Tachypleus gigas. It has been included In Schedule IV of Wildlife Protection Act, 1972. The migration of these crabs is linked with the earth’s magnetic field. Threats faced by these animals include fishing (getting trapped in fishing net); coastal erosion and loss of habitat; development of fishing harbours and jetties and other coastal development that reduces their habitat. 2.12.6 Protected Areas These include those declared under the Wildlife Protection Act, 1972, the Forest (Conservation) Act, 1980, the Environment (Protection) Act, 1986 and the Biodiversity Act, 2002. Protected Areas under the Wild Life (Protection) Act, 1972 National Parks: National Park is an area having adequate ecological, faunal, floral, geomorphological, natural or zoological significance. It is declared for the purpose of protecting, propagating or developing wildlife or its environment, like that of a Sanctuary. The difference between a Sanctuary and a National Park mainly lies in the vesting of rights of people living inside. Unlike a Sanctuary, where certain rights can be allowed, in a National Park, rights are not allowed. Grazing of any livestock shall not be permitted inside a National Park while in a Sanctuary, the Chief Wildlife Warden may regulate, control or prohibit it. In addition, while any removal of wildlife or forest produce from a Sanctuary requires the recommendation of the State Board for Wildlife, such activity in a National Park requires the recommendation of the National Board for Wildlife. Marine Parks: When the area covered is in the marine realm, it is a marine national park. Marine National Parks in India Sundarbans, West Bengal. 1330 km2 Bhitarkanika, Odhisha. 145 km2 Gulf of Mannar, Tamil Nadu, 560 km2 (MNP) Gulf of Kachchh, Gujarat, 162.89 km2 (MNP) Box 2.1: Marine National Parks in India Sanctuaries: Sanctuary is an area which is of adequate ecological, faunal, floral, geomorphological, natural or zoological significance. It is declared for the purpose of protecting, propagating or developing wildlife or its environment. Certain rights of people living inside the Sanctuary could be permitted. Further, during the settlement of claims, before finally notifying the Sanctuary, the Collector may, in consultation with Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 31 the Chief Wildlife Warden, allow the continuation of any right of any person in or over any land within the limits of the Sanctuary. The following are important Sanctuaries in India located along the coast. Important Sanctuaries along the Indian coast Sunderbans, West Bengal Sanjana Khali, West Bengal, 362.04 km2 Lothian, West Bengal, 38 km2 Halliday, West Bengal, 5.95 km2 Bhitarkanika, Odisha, 672 km2 Gahirmata, Odisha, 1435 km2 Nalaban (Chilika), Odisha, 15.53 km2 Coringa, Andhra Pradesh, 235.7 km2 Krishna, Andhra Pradesh, 194.81 km2 Pulicat, Andhra Pradesh and Tamil Nadu, 500 km2 Point Calimere, Tamil Nadu, 17.26 km2 Malvan, Maharashtra, 29.12 km2 Gulf of Kachchh, Gujarat, 295.3 km2 Box 2.2: Important Sanctuaries along the Indian Coast Protected Areas under the Forest Act Reserve Forests: ‘Reserved Forest’ (also called ‘reserve forest’) and ‘protected forest’ are terms under the Indian Forest Act, 1927 used for forests accorded a certain degree of protection. Land rights to forests declared to be Reserved forests or Protected forests are typically acquired (if not already owned) and owned by the Government of India. Unlike national parks of India or wildlife sanctuaries of India, reserved forests and protected forests are declared by the respective state governments. As of present, reserved forests and protected forests differ in that rights to all activities like hunting, grazing, etc. in reserved forests are banned unless specific orders are issued otherwise. Wildlife habitats: Section 2b of The Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006, defines 'Critical Wildlife Habitat' as such areas of National Parks and Sanctuaries that are required to be kept as inviolate for the purposes of wildlife conservation as determined and notified by the MoEFCC, after open process of consultation by an Expert Committee, on a case by case basis following scientific and objective criteria32. Thus many of these are likely to be already under protected status. 32 MoEFCC, 2011. Guidelines for notification of critical wildlife habitats including functions of expert committee, scientific information required and resettlement and matters incidental thereto. F. No. 1- 39/ 2007 WL-l (pt) dated 7th February 2011. http://moef.nic.in/downloads/public-information/rev- gdlns-CWH.pdf accessed July 19, 2013 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 32 2.12.7 Other Protected Areas Conservation Reserves can be declared by the State Governments in any area owned by the Government, particularly the areas adjacent to National Parks and Sanctuaries and those areas which link one Protected Area with another. Such a declaration should be made after having consultations with the local communities. Conservation Reserves are declared for the purpose of protecting landscapes, seascapes, flora and fauna, and their habitat. The rights of people living inside a Conservation Reserve are not affected. Community Reserves can be declared by the State Government in any private or community land, not comprised within a National Park, Sanctuary or a Conservation Reserve, where an individual or a community has volunteered to conserve wildlife and its habitat. Community Reserves are declared for the purpose of protecting fauna, flora and traditional or cultural conservation values and practices. As in the case of a Conservation Reserve, the rights of people living inside a Community Reserve are not affected. Biosphere reserves Biosphere Reserve (BR)33 is an international designation by UNESCO for representative parts of natural and cultural landscapes extending over large areas of terrestrial or coastal/marine ecosystems or a combination thereof. BRs are designated to deal with one of the most important questions of reconciling the conservation of biodiversity, the quest for economic and social development and maintenance of associated cultural values. BRs are thus special environments for both people and nature and are living examples of how human beings and nature can co-exist while respecting each-others’ needs. These areas are internationally recognized within the framework of UNESCO’s Man and Biosphere (MAB) programme, after receiving the consent of the participating country. The world’s major ecosystem types and landscapes are represented in this network. BRs in coastal India include: • Sunderbans (9630 km2) declared on 29.3.1989. Part of the delta of the Ganges & Brahamaputra river system in West Bengal. • Gulf of Mannar (10500 km2) 18.2.1989 India part of Gulf of Mannar extending from Rameswaram island in the North to Kanyakumari in the South of Tamil Nadu. • Great Nicobar, Southernmost Island of Nicobar Islands archipelago. Covers 103870 Ha. 33 Protection, Development, Maintenance and Research in Biosphere Reserves in India, Guidelines and Proformae, MoEFCC, GoI, 2007. http://moef.nic.in/divisions/csurv/BR_Guidelines.pdf accessed March 18, 2013 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 33 Protected area categories 34 The following Table 2.5 presents the various categories of protected areas in India. Table 2.5: Categories of Protected Areas Name Objectives Features Zone National Conservation of species of No human resides in the Park, Core Parks habitat with minimal or very other than a public servant on low intensity of human duty and permitted persons by the activity. Chief Wild Life Warden. Sanctuaries Conservation of species and No human resides in the Core, Buffer, habitats by manipulative Sanctuary, other than a public and management. servant on duty and permitted Restoration persons by the Chief Wild Life Warden. Biosphere Conservation of the natural Both natural and human- Core, Buffer, Reserves resources and for the influenced ecosystems; Restoration, improvement of the substantial human settlements and Cultural relationship between man and (rural). the environment therein. Marine Protected Areas in India (mainland)35 Category I: Marine Protected Areas as per IUCN criteria are where marine areas are in focus with boundaries marked in the seaward side or intertidal/subtidal areas. They include coral reefs, seagrass beds, mangroves, mangrove creeks, backwaters, lagoons, swamps, marshy/saline lands, estuaries, turtle nesting sites/ beaches (where trawling or fishing regulations are required in the sea), etc. • Gulf of Kachchh Marine National Park, Jamnagar, Gujarat Marine Sanctuary, Gulf of Kachchh, Jamnagar, Gujarat • Gulf of Mannar Marine National Park, Ramanthapuram, Tuticorin, Tamil Nadu. • Malvan Marine Sanctuary, Sindhudurg, Maharashtra • Gahirmatha Marine Sanctuary, Kendrapara, Odisha • Coringa Wildlife Sanctuary, East Godavari, Andhra Pradesh • Sunderbans National Park and Tiger Reserve, North and South 24 Parganas, West Bengal • Chilika (Nalabana) Wildlife Sanctuary, Kundra, Puri, Ganjam, Orissa • Pulicat Lake (Bird) Sanctuary, Thiruvallur, Tamil Nadu 34 http://ces.iisc.ernet.in/envis/sdev/parks.htm 35 Extracted from Venkatraman, K., Rajkumar Rajan, Ch. Satyanarayana, C. Raghunathan and C. Venkatraman, 2012. Marine Ecosystems and Marine Protected Areas of India: 1-296 (Published by the Director, Zool. Surv. India, Kolkata) Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 34 • Sajna Khali Sanctuary, South 24 Parganas, West Bengal Category II: Protected Areas where the current area of focus is terrestrial, including islands – and boundaries confined to land – however, have important marine biodiversity areas adjoining their territories which require marking boundaries in the seaward side, and substantial in size to the Protected Areas in focus (This category Protected Areas have the potential to be brought under Category I, if amalgamated into clusters and the seaward boundaries notified). • Halliday Island Sanctuary, Sunderbans, West Bengal Category III: Pas where areas in focus are primarily terrestrial, however, these are coastal sites and islands and have important marine areas in the fringes (usually smaller in size to the area of PA). • Bhitarkanika Wild Life Sanctuary, Odisha • Point Calimere Sanctuary, Tamil Nadu • Lothian Island sanctuary, Sunderbans, West Bengal Box 2.3: Marine Protected Areas in India (mainland) Under Environment (Protection) Act, 1986 Under Clause (v) of Sub-section (2) of Section 3 of the Environment Protection Act (1986), several ecological sensitive areas have been designated (various terminologies have been employed over time). Only two coastal areas have been designated so far as eco-sensitive areas. Dahanu Taluka (Maharashtra) (1991): Dahanu Taluka, District Thane (Maharashtra) was declared as an ecologically fragile area and restrictions imposed on the setting up of industries which have a detrimental effect on the environment vide S.O. No. 80 (E), dated 8 February 1991 and Corrigendum (S.O. 147 (E) issued on 27 February 1991). Guidelines for permitting/ restricting industries and industrial units in the Taluka classify them into three categories (green, red and orange)36. Murud-Janjira37 (1989): Ban on location of all industries, carrying on of operations or processes in a belt of one kilometer from the high tide mark from the Revdanda Creek (lat 19o 35') upto Devgarh Point (near Shrivardhan) (lat 18o 0') as well as in a one kilometre belt along the banks of the Rajpuri Creek upto Mhasla, except those industries, operations of processes which are in connection with the promotion and development of Tourism and those which are permitted by the Central Government after examining the environmental impact. 36 http://www.moef.nic.in/legis/eia/dtepauth.html 37 http://www.moef.nic.in/legis/eia/murud.html Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 35 India has taken several steps to achieve the National Biodiversity Target no 6 and Aichi Biodiversity Target no 11 which aims to conserve a substantial portion of the coastal and marine areas in the country and world respectively38. Towards achieving these two targets, 106 coastal and marine sites have been identified and prioritized as ‘Important Coastal and Marine Areas’ (ICMBAs) by the Wildlife Institute of India. Sixty two ICMBAs have been identified along the west coast of India, and 44 have been identified along the east coast. Of these, 22 ICMBAs have been prioritized for immediate conservation actions and proposed to be upgraded as Protected Areas under categories such as Conservation or Communities Reserve to increase participation of the local communities in governance. 2.13 Marine Fauna 2.13.1 Marine Mammals Twenty-five species of marine mammals are found in Indian waters and belong to two orders Cetacea and Sirenia. Sea cow Dugong dugon occurs in the nearshore waters of Gulf of Mannar, Gulf of Kachchh and the Andaman and Nicobar Islands39. One species belonging to the order Sirenia, namely the dugong, and 30-34 species of cetaceans (dolphins, whales, and porpoises) including the Ganges river dolphin, are found in the waters of the Indian subcontinent40. All species of marine mammals along the Indian coasts are protected under the Indian (Wildlife) Protection Act (1972). However, they continue to be affected by incidental capture in fishing operations. The population of dugong has reduced to low levels over the years41. 2.13.2 Birds A number of birds fly through India’s coastal areas as part of their annual migration patterns either in search of feeding grounds or to escape the severe winter of their native habitat. The nesting of birds occurs in masses at isolated locations which are called nesting grounds. Some of them have been declared as bird sanctuaries but there are other habitats where mass nesting occurs during specific seasons. Table 2.6: Major bird sanctuaries in India’s coastal states West Coast Bird Sanctuaries East Coast Bird Sanctuaries Gujarat Nalsarovar Bird Sanctuary Tamil Nadu Vedanthangal Bird Sanctuary Porbandar Bird Sanctuary Pulicat Lake Bird Sanctuary 38 Important Coastal and Marine Biodiversity Areas (ICMBAs). http://wiienvis.nic.in accessed 14 April, 2016 39 Venkataraman, K and M. Wafar, 2005. Coastal and Marine Biodiversity of India. Indian J. Marine Sci., 34(1)57-75. 40 Marine Mammal Conservation Network of India. http://www.marinemammals.in/ accessed on 18 April, 2019 41 Bhatt, JR and E. Vivekanandan, 2013. Coastal and Marine Biodiversity Conservation in India. Regional Symposium on Ecosystem Approaches to Marine Fisheries & Biodiversity, October 27-30, 2013, Kochi Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 36 West Coast Bird Sanctuaries East Coast Bird Sanctuaries Khijadia Bird Sanctuary Kunthakulam Bird Sanctuary Thol Bird Sanctuary Point Calimere Jamnagar salt pans Maharashtra Jayakwadi Bird Sanctuary Andhra Kolleru Bird Sanctuary Aurangabad Pradesh Pulicat lake bird sanctuary Karnala Bird Sanctuary Raigad Manjira Bird Sanctuary Nandurmadhmeshwar Bird Nelapattu Bird Sanctuary Sanctuary, Nashik Rollapadu Bird Sanctuary Vengurla Rocks (Great Indian Bustard) Goa Salim Ali Bird Sanctuary Odisha Chilika Lake Bird Sanctuary Nalabana Bird Sanctuary Karnataka Ranganathittu Bird Sanctuary West Bengal Rasikbil Bird Sanctuary Ghataprabha Bird Sanctuary Sajnakhali Bird Sanctuary Gudavi Bird Sanctuary Chintamani Kar Bird Mandagadde Bird Sanctuary Sanctuary Kerala Kumarakom Bird Sanctuary Kulik Bird Sanctuary Kadalundi Bird Sanctuary (Raigunge) Thattekad Bird Sanctuary 2.13.3 Marine turtles Of the seven species of turtles that occur in the world five breed along the Indian coasts. These include the Leatherback sea turtle Dermochelys coriacea, Green turtle Chelonia mydas, Olive Ridley Lepidochelys olicacea, the Hawksbill turtle Eretmochelys imbricata and the Loggerhead Caretta. Among these, mass nesting of Olive Ridley occurs along Odisha coast (east coast of India) every year. The GoI is taking strict actions to protect the marine turtles under the Indian Wildlife (Protection) Act (1972) and in Appendix I of the Convention on International Trade in Endangered Species of Wild Fauna & Flora. Fishing is prohibited during the mass nesting period of the Olive Ridley along the Odisha coast. Beach hatcheries are also found in a few locations42. 2.13.4 Sharks Whaleshark43: Until 2000, the whaleshark was exploited by unregulated and unsustainable fisheries to meet international trade demands for shark fins, liver oil, skin, and meat. In July 2001, the whale shark was included in Schedule I of Indian Wildlife (Protection) Act, 1972, thus giving whaleshark protection and making it the first marine fish to be listed in the aforesaid Act. The whaleshark campaign has spread awareness on the species and the protected status in Gujarat (northwest coast of India). It helped convert the fishermen into protectors of the fish and brought about a change in the perception and attitude of local people. 42 Bhatt, JR and E. Vivekanandan, 2013. Coastal and Marine Biodiversity Conservation in India. Regional Symposium on Ecosystem Approaches to Marine Fisheries & Biodiversity, October 27-30, 2013, Kochi 43 Bhatt, JR and E. Vivekanandan, 2013. Coastal and Marine Biodiversity Conservation in India. Regional Symposium on Ecosystem Approaches to Marine Fisheries & Biodiversity, October 27-30, 2013, Kochi Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 37 2.13.5 Sea Cucumber As sea cucumbers44 were collected in large numbers and exported, the government prohibited the activity under Schedule I of the Wild Life (Protection) Act 1972. Central Marine Fisheries Research Institute has developed breeding techniques for sea cucumbers, enhancing the potential for sea ranching the seed for stock improvement as well as for establishing commercial hatcheries. A summary of marine taxa reported so far is presented in Table 2.7. Table 2.7: Marine flora and fauna in Indian waters 45 Plantae Animalia Taxon Number Taxon Number Taxon Number Proifera 486+ Hemichordata 12 Diatoms 200+ Cnidaria 842+ Protochordata 119+ Dinoflagellates 90+ Ctenorphora 12+ Pisces 2546 Macroalgae 844 Platyhelmintha 350 Reptilia 35 Seagrasses 14 Annelida 338 Mammalia 25 Mangroves 39 Chaetognatha 30+ Sipuncula 35 Protista Echiura 33 Protozoa 532+ Gastrotrocha 75 Foraminifera 500+ Kinorhyncha 10 Tintinnids 32+ Tardigrada 10+ Crustacea 3498 Mollusca 3370 Bryozoa 200+ Echinodermata 765 2.14 Fish Resources There are about 2000 marine species that are caught from the Indian seas. The following are the top resources by quantity that are caught off Indian waters46. 1 Oil sardine 2 Penaeid prawns 3 Indian mackerel 4 Croakers 5 Ribbon fishes 44 Bhatt, JR and E. Vivekanandan, 2013. Coastal and Marine Biodiversity Conservation in India. Regional Symposium on Ecosystem Approaches to Marine Fisheries & Biodiversity, October 27-30, 2013, Kochi 45 Wafar M, Venkataraman K, Ingole B, Ajmal Khan S, LokaBharathi P (2011) State of Knowledge of Coastal and Marine Biodiversity of Indian Ocean Countries. PLoS ONE 6(1): e14613. https://doi.org/10.1371/journal.pone.0014613 46 Sathianandan, T.V., 2013. Status of Marine Fisheries Resources in India – An Overview. Winter School on ICT-oriented Strategic Extension for Responsible Fisheries Management Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 38 6 Non-Penaeid prawns 7 Threadfin breams 8 Bombay Duck 9 Other sardines 10 Catfishes 2.15 Socioeconomic Characteristics 2.15.1 Demographics India's population, as on 1 March 2011 stood at 1,210,193,422 (623.7 million males and 586.4 million females), with a sex ratio of 940 females for 1000 males. The average annual exponential growth rate stood at 1.64 percent during 2001-2011. According to the 2011 census, the literacy rate in the Country stood at 74.04 percent, 82.14 percent for males and 65.46 percent for females. The coastal areas are divided into 13 administrative units comprising of 9 states and 4 Union territories including the Island territories. There are nine maritime states and two union territories are located on the mainland coast of India. The total coastal population in India is 225 million. Table 2.8 presents the coastal population and population density (ie. no: of people per sqkm of area) in various coastal districts. Accordingly, there are 78 coastal districts occupying about 394,147 sq.km of land area with an average population density of 513 persons/sq.km. Table 2.8: Population of India’s Coastal Districts Sl.No District Population- Population- Area in Population Population 2001 2011 (sq.km) density-2001 density-2011 West Bengal 1 North Twenty Four 8934286.00 10082852.00 12286.59 727.16 820.64 Parganas 2 South Twenty Four 6906689.00 8153176.00 4647.73 1486.03 1754.23 Parganas 3 Purba medinipur 9610788.00 11037538.00 5021.70 1913.85 2197.97 Total 25451763.00 29273566.00 21956.02 1159.22 1333.28 Odisha 4 Baleshwar 2024508.00 2317419.00 5021.70 403.15 461.48 5 Bhadrak 1333749.00 1506522.00 5021.70 265.60 300.00 6 kendrapara 1302005.00 1439891.00 2818.47 461.95 510.88 7 Jagatsinghapur 1057629.00 1136604.00 1979.84 534.20 574.09 8 Puri 1502682.00 1697983.00 4037.03 372.23 420.60 9 Khordha 1877395.00 2246341.00 3131.66 599.49 717.30 10 Ganjam 3160635.00 3520151.00 9604.18 329.09 366.52 11 Gajapati 518837.00 575880.00 4571.07 113.50 125.98 Total 12777440.00 14440791.00 36185.64 353.11 399.08 Andhra Pradesh 12 East Godavari 4901420.00 5151549.00 11945.69 410.31 431.25 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 39 Sl.No District Population- Population- Area in Population Population 2001 2011 (sq.km) density-2001 density-2011 13 Srikakulam 2537593.00 2699471.00 7072.47 358.80 381.69 14 Vizianagram 2249254.00 2342868.00 6242.14 360.33 375.33 15 Visakhapatnam 3832336.00 4288113.00 12691.29 301.97 337.88 16 West Godavari 3803517.00 3934782.00 8531.80 445.80 461.19 17 Krishna 4187841.00 4529009.00 9366.55 447.11 483.53 18 Guntur 4465144.00 4889230.00 12477.18 357.86 391.85 19 Prakasam 3059423.00 3392764.00 19204.68 159.31 176.66 20 Nellore 2668564.00 2966082.00 14072.24 189.63 210.78 Total 31705092.00 34193868.00 101604.04 312.05 336.54 Tamil Nadu 21 Thrivallur 2754756.00 3725697.00 3538.82 778.44 1052.81 22 Chennai 4343645.00 4681087.00 187.77 23132.67 24929.77 23 Kanchepuram 2877468.00 3990897.00 4749.45 605.85 840.29 24 Viluppuram 2960373.00 3463284.00 7555.17 391.83 458.40 25 Cuddalore 2285395.00 2600880.00 3881.68 588.76 670.04 26 Nagappattinam 1488839.00 1614069.00 2559.38 581.72 630.65 27 Thiruvarur 0.00 3728104.00 2171.45 0.00 1716.87 28 Thanjavur 2216138.00 2402781.00 3769.59 587.90 637.41 29 Pudukkottai 1459601.00 1618725.00 4837.91 301.70 334.59 30 Ramanathapuram 1187604.00 1337560.00 4357.47 272.54 306.96 31 Thoothukudi 1572273.00 1738376.00 4775.45 329.24 364.02 32 Tirunelveli 2723988.00 3072880.00 7006.74 388.77 438.56 33 Kanyakumari 1676034.00 1863174.00 1736.55 965.15 1072.92 Total 27546114.00 35837514.00 51127.43 538.77 700.94 Kerala 34 Kasargod 1204078.00 1302600.00 2072.73 580.91 628.45 35 Kannur 2408956.00 2525637.00 3108.28 775.01 812.55 36 Kozhikode 2879131.00 3089543.00 2444.26 1177.91 1264.00 37 Malappuram 3625471.00 4110956.00 3725.18 973.23 1103.56 38 Thrissur 2974232.00 3110327.00 3149.22 944.43 987.65 39 Ernakulam 3105798.00 3279860.00 2501.81 1241.42 1311.00 40 Alappuzha 2109160.00 2121943.00 1469.12 1435.67 1444.37 41 Kottayam 1953646.00 1979384.00 2288.52 853.67 864.92 42 Kollam 2585208.00 2629703.00 2564.92 1007.91 1025.26 43 Thiruvananthapuram 3234356.00 3307284.00 2243.23 1441.83 1474.34 Total 26080036.00 27457237.00 25567.28 1020.06 1073.92 Karnataka 44 Uttara Kannada 1353644.00 1436847.00 10964.34 123.46 131.05 45 Udupi 1112243.00 1177908.00 4112.18 270.48 286.44 46 Dakshin Kannada 1897730.00 20883625.00 4856.70 390.74 4299.96 Total 4363617.00 23498380.00 19933.21 218.91 1178.86 Goa 47 South Goa 589095.00 639962.00 2104.60 279.91 304.08 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 40 Sl.No District Population- Population- Area in Population Population 2001 2011 (sq.km) density-2001 density-2011 48 North Goa 758573.00 817761.00 1820.65 416.65 449.16 Total 1347668.00 1457723.00 3925.24 343.33 371.37 Maharashtra 49 Thane 8131849.00 11054131.00 10783.50 754.10 1025.10 50 Mumbai Suburban 0.00 2105604.00 509.68 0.00 4131.22 51 Mumbai 3338031.00 3145966.00 167.74 19900.56 18755.52 52 Raigarh 2207929.00 2635394.00 8000.74 275.97 329.39 53 Ratnagiri 1696777.00 1612672.00 9109.22 186.27 177.04 54 Sindhudurg 868825.00 848868.00 5526.53 157.21 153.60 Total 16243411.00 21402635.00 34097.40 476.38 627.69 Gujarat 55 Kachchh 1583225.00 2090313.00 22113.08 71.60 94.53 56 Rann of Kachchh 0.00 0.00 28031.34 0.00 0.00 57 Rajkot 3169881.00 3799770.00 8926.23 355.12 425.69 58 Morvi (Movbi) 0.00 0.00 4209.84 0.00 0.00 59 Jamnagar 1904278.00 2159130.00 7396.82 257.45 291.90 60 Devbhumi Dwarka 4817.91 0.00 0.00 61 Porbandar 536835.00 586062.00 2652.09 202.42 220.98 62 Junagadh 2448173.00 2742291.00 6467.07 378.56 424.04 63 Gir Somnath 0.00 0.00 3723.83 0.00 0.00 64 Amreli 1393918.00 1513614.00 8494.05 164.11 178.20 65 Bhavnagar 2469630.00 2877961.00 7535.26 327.74 381.93 66 Ahmedabad 5816519.00 7208200.00 9170.37 634.27 786.03 67 Anand 1856872.00 2090276.00 4074.48 455.73 513.02 68 Bharuch 1370656.00 1550822.00 5520.31 248.29 280.93 69 Surat 4995174.00 6079231.00 8536.25 585.17 712.17 70 Nasari 1229463.00 1330711.00 2545.79 482.94 522.71 71 Valsad 1410553.00 1703068.00 3446.95 409.22 494.08 Total 30185177.00 35731449.00 137661.69 219.27 259.56 Andaman & Nicobar 72 Andaman 314084.00 343125.00 5693.66 55.16 60.26 73 Nicobar 42068.00 36819.00 1691.74 24.87 21.76 Total 356152.00 379944.00 7385.41 48.22 51.45 Pondicherry 74 Karikal 170791.00 200314.00 159.96 1067.74 1252.31 75 Pondicherry 735332.00 946600.00 312.41 2353.77 3030.02 Total 906123.00 1146914.00 472.36 1918.28 2428.04 Lakshadweep 76 Lakshadweep 60650.00 64429.00 477.07 127.13 135.05 Total 60650.00 64429.00 Diu & Daman 77 Daman 113989.00 190855.00 84.14 1354.80 2268.38 78 Diu 44215.00 52056.00 33.41 1323.32 1558.00 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 41 Sl.No District Population- Population- Area in Population Population 2001 2011 (sq.km) density-2001 density-2011 Total 158204.00 242911.00 117.55 1345.85 2066.46 Population- Population- 2001 2011 Total Coastal districts and 177181447.00 225127361.00 UT population of India Growth Rate 2.70603468 2.15.2 Cities and Towns As per the Census data of 2011, there are 486 census towns along the coast of India, accounting for a population of 41.7 million constituting 20.7% of the total coastal population. Of the 486 towns, 42 are classified as Class-I towns that have a population of > 100,000 persons. Table 2.9 below gives the classification of settlements based on their population. Table 2.9: Classification of cities based on population Population Classification Population Tier-1 100,000 and above Tier-2 50,000 to 99,999 Tier-3 20,000 t0 49,999 Tier-4 10,000 to 19,999 Tier-5 5,000 to 9,999 Tier-6 Less than 5000 The following table; Table 2.10 presents the state-wise different classes towns in India. Table 2.10: State-wise number of different classes of towns State Name Number Number Number Number Number Number Total of of of of of of Number of Class-I Class-II Class-III Class-IV Class-V Class-VI Census Towns Towns Towns Towns Towns Towns Towns Gujarat 7 14 24 32 20 10 107 Diu & Daman 0 1 2 4 1 0 8 Maharashtra 6 4 1 7 12 1 31 Goa 0 3 4 18 31 8 64 Karnataka 2 2 5 9 10 4 32 Kerala 6 9 49 16 9 1 90 Tamil Nadu 5 2 28 18 5 0 58 Puducherry 2 2 4 3 0 0 11 Andhra Pradesh 7 7 4 5 6 2 31 Odisha 3 1 0 2 9 4 19 West Bengal 4 3 8 12 37 8 72 Total Number of 42 48 129 126 140 38 523 Class Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 42 2.15.3 Urban Agglomerations Census of India defines Urban Agglomerations as ‘a continuous urban spread comprising one or more towns and their adjoining out growth(s)’ where outgrowth refers to areas around a core city or town, such well recognized places, like, Railway colony, university campus, port area, etc., lying outside the limit of town. Many towns have grown during the last few decades due to rapid industrial development. Some of these have also reached megacity status (more than 10 million population). India has two coastal megacities apart from a number of cities with more than one million population (Table 2.11) located on the coast. Many of these cities are port cities or have major industries. Apart from these, there are several towns and cities located along the coast where agriculture and fishing are major livelihoods. Table 2.11: Coastal cities/Agglomerations with million plus population 47 Sl.No. Coastal City State Population 1 Greater Mumbai Agglomeration Maharashtra 18,414,288 2 Chennai Agglomeration Tamil Nadu 8,696,010 3 Surat Agglomeration Gujarat 4,585,367 4 Kochi Agglomeration Kerala 2,117,990 5 Kozhikode Agglomeration Kerala 2,030,519 6 Vadodara Gujarat 1,817,191 7 Vishakhapatnam Andhra Pradesh 1,730,320 8 Puri Orissa 1,697,983 9 Thiruvananthapuram Kerala 1,687,406 Agglomeration 10 Kannur Agglomeration Kerala 1,642,892 11 Vasai Virar City (M Corp.) Maharashtra 1,221,233 12 Kollam Agglomeration Kerala 1,110,005 2.15.4 Fishing Villages There are 3,288 marine fishing villages distributed among the nine maritime states and two union territories. There are 42,53,451 people belonging to 8,64,550 marine fishermen households. Of these, 90 percent belong to traditional fisher families. Tamil Nadu has the largest population of marine fishers (8.02 lakhs), followed by West Bengal (6.34 lakhs) and Kerala (6.10 lakhs). Nearly 61 percent of the fishermen families are under the BPL category. The average family size was 4.63 and the overall sex ratio was 928 females per 1000 males. Almost 58 percent of the fisher folk were educated with different levels of education. About 38 percent of marine fisher folk were engaged in active fishing with 85 percent of them having full time engagement. About 63.6 percent of the fisher folk were engaged in fishing and allied activities. Among the marine fishermen households, nearly 76 percent were Hindus, 15 percent were 47 http://censusindia.gov.in/2011-prov- results/paper2/data_files/india2/Million_Plus_UAs_Cities_2011.pdf Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 43 Christians and 9 percent were Muslims. Marine fishermen households belonging to Scheduled Caste/Scheduled Tribes (SC/ST) was 17 percent (CMFRI census 2010). 2.15.5 Ethnicity Many of the traditional fishermen living in coastal areas belong to specific caste groups. A list of such groups is given in Table 2.12. Table 2.12: Major marine fishing Communities of India 48 State Major fishing Communities Tamil Nadu Pattinavars, Mukkuvar, and Paravas Andhra Pradesh Vadabalijas, Jalaris, Pattapu, and Palles Odisha Jalaris, Vadabalijas, Kaibartas, Khandayats, and Rajbhansis West Bengal Kaibartas Gujarat Kharvas, Kolis, and Macchiyaras Maharashtra Kolis Karnataka Mogaveeras Kerala Mukkuvar, Anjootty, Dheevera, and Pooislan Tribes of Andaman & Nicobar Islands Andaman and Nicobar Islands are the homelands of six tribal populations of which the particularly vulnerable groups are: • Great Andamanese of Strait Island • Onges of Little Andaman • Jarawas of South and Middle Andaman • Sentinelese of Sentinel Islands • Shompens of Great Nicobar While these groups continue largely to be hunter-gatherers, the sixth group, the Nicobarese have settled in cities. 2.16 Economic Activities 2.16.1 Employment The working population and work participation rate highlight the occupational distribution of a region. The number of total workers in the country has almost doubled in the 30 years period from 1981 to 2011. The corresponding increase in rural workers and urban workers is 77 percent and 182 percent respectively (Table 2.13). 48 Fishing Communities http://indianfisheries.icsf.net/en/page/613-Fishing%20Communities.html accessed 23 Sep 16 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 44 Table 2.13: Worker Participation Rate in India Years Rural Urban Total Percentage Distribution Rural Urban Total 1981 244,604,986 197,308,289 47,296,697 36.8 38.9 30 1991 314,131,370 249,028,944 65,102,426 37.5 40 30.2 2001 402,234,724 309,956,070 92,278,654 39.1 41.7 32.3 2011 481,888,868 348,743,092 133,145,776 39.8 41.8 35.3 2.16.2 Agriculture Agriculture, with its allied sectors, is the largest livelihood provider in India, especially in rural areas. Gross Value Added by agriculture, forestry, and fishing is estimated at Rs 18.53 trillion (US$ 271.00 billion) in FY 2018. During the 2017-18 crop year, food grain production is estimated at record 284.83 million tonnes. In 2018-19, GoI is targeting food grain production of 285.2 million tonnes. Milk production was estimated at 165.4 million tonnes during FY17, while meat production was 7.4 million tonnes. As of September 2018, the total area sown with kharif crops in India reached 105.78 million hectares. India is the second largest fruit producer in the world. Production of horticulture crops is estimated at record 314.7 million tonnes (mt) in 2018-19 as per third advance estimates49. Agricultural productivity depends on various factors such as the availability and quality of agricultural inputs such as land, water, seeds and fertilizers, access to agricultural credit and crop insurance, assurance of remunerative prices for agricultural produce, and storage and marketing infrastructure, among others. Key issues affecting agricultural productivity have been identified as decreasing sizes of agricultural land holdings, continued and high dependence on the monsoon, inadequate access to irrigation, imbalanced use of soil nutrients resulting in loss of fertility of soil, uneven access to modern technology in different parts of the country, lack of access to formal agricultural credit, limited procurement of food grains by government agencies, and failure to provide remunerative prices to farmers50. Because of the many deltas along the east coast and good water availability due to the monsoon along the west coast, agricultural activities are prominent along the coast. However, coastal regions are prone to rising sea levels and other impacts of climate change including changes in temperature and precipitation patterns. The INCCA 4x4 assessment 51 predicts that yields of irrigated rice are projected to decrease by 10 to 20 percent in many coastal locations. However, rain fed rice yields are projected to 49 Agriculture in India: Information About Indian Agriculture & Its Importance. https://www.ibef.org/industry/agriculture-india.aspx accessed 23 April 2019 50 State of Agriculture in India. https://www.prsindia.org/policy/discussion-papers/state-agriculture- india accessed 23 April 2019 51 INCCA 2010 op.cit Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 45 increase along the west coast and decrease along the east coast. Impacts of climate change are likely to increase the vulnerability of livestock in coastal areas. In coastal areas, salinization is a major problem and is associated with overexploitation of groundwater which lowers the groundwater table leading to sea water intrusion 2.16.3 Fisheries With over 2.4 lakh fishing crafts operating along the coast, 7 major fishing harbours, 75 minor fishing harbours, and 1,537 landing centres are functioning to cater to the needs of over 4.0 million fisher folks. Marine capture fisheries production is greater in waters off the west coast of India due to the large continental shelf in the Arabian Sea. The upwelling phenomenon is more active off the west coast which increases the nutrients in our west coast waters. Around 70 percent of India’s marine catch currently is taken off the west coast and around 30 percent is caught off the east coast though the proportion changes each year. Most fish caught in India are destined for domestic consumption. However, the volume of seafood products destined for export continues to grow, both in terms of marine capture and aquaculture products. As a part of efforts to protect marine resource stocks and encourage sustainable fishing, the government enforces seasonal fishing bans on important fishing grounds and has tightened up the issuing of fishing boat licenses to prevent the national fleet size from growing any further for the moment. Seasonal bans to protect fish stocks include a 61 day ban on fishing along India’s west coast from 1 June to 31 July, which has replaced the former 46-day fishing ban. Meanwhile, fishing along India’s east coast is prohibited from 15 April to 14 June each year. India’s marine fish production in 2017 registered a 5.6 percent increase compared to the previous year. The total marine fish landings in India (excluding Andaman & Nicobar and Lakshadweep islands) in 2017 were 3.83 million with Gujarat remaining at the top position for the fifth consecutive year with contributing 7.86 lakh tonnes (20.5 percent of total landings) followed by Tamil Nadu and Kerala. Revival of oil sardine in the western coastal states especially in Kerala played a major role in improving the country’s marine fish production this time. However, the east coast witnessed a decline in the oil sardine catch with an 83 percent drop in Andhra Pradesh and 36 percent in Tamil Nadu compared to 2016. A total of 788 marine fish species were landed this time along the Indian coast with maximum numbers landed along the Tamil Nadu coast followed by Kerala and Maharashtra52. Over 81 percent of the total landings were from the mechanized sector whereas the motorized sector contributed 17 percent and the contribution from the traditional non- mechanized sector was only 2 percent. Mechanized trawl nets accounted for 58 percent 52 https://timesofindia.indiatimes.com/business/india-business/sign-of-revival-in-indias-marine-fish- production-catch-increased-by-5-6/articleshow/64749228.cms accessed June 26, 2018 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 46 of the total marine fish landings whereas mechanized gillnets and outboard ring seines contributed 8 percent each. The total number of species found in the landings along the Indian coast during 2016 is 817 where as it was 730 in 201553. 2.16.4 Aquaculture Coastal aquaculture collectively includes land based and water based brackish and marine aquaculture. This contributes significantly to the coastal economy while providing livelihood and employment to rural coastal populations in addition to promoting other ancillary industries and contributing to exports. The Coastal Aquaculture Authority established by an Act of Parliament viz. “The Coastal Aquaculture Authority Act, 2005” is responsible for promoting sustainable, regulated development of coastal aquaculture in the notified areas, i.e., 2 km. from the High Tide Line. While shrimp has been the mainstay of coastal aquaculture, the introduction of Specific Pathogen Free (SPF) Litopenaeus vannamei, the exotic white shrimp, has helped prevent mass outbreak of shrimp diseases. The Coastal Aquaculture Authority (CAA) carries out registration of shrimp farms in the country. The details of the number of farms for which certificates were issued between December 2005 and March 201654 is presented in Table 2.14 below. Table 2.14: Coastal Aquaculture farms as of 2014 Sl States / UTs No: of Farms under various area categories Total Area of farm No: no: of 0-2 2.01-5 5.0-10 10.01-40 >40.01 Farms TFA(ha) WSA(ha) 1 West Bengal 2,248 165 6 0 0 2,419 2,638 1,776 2 Odisha 6,141 424 30 17 0 6,612 8,611 5,483 3 Andhra 15,373 1,059 128 60 9 16,629 24,337 17,213 Pradesh 4 Tamil Nadu 930 631 131 19 1 1,712 5,026 3,470 5 Puducherry 33 1 0 0 0 34 60 45 6 Kerala 943 215 18 5 1 1,182 2,423 1,635 7 Karnataka 258 42 2 2 0 304 419 320 8 Goa 22 15 2 2 0 41 138 97 9 Maharashtra 93 123 25 18 6 265 2,075 1,305 10 Gujarat 146 603 8 1 2 760 3,450 2,461 11 Daman & 0 12 0 0 0 12 60 38 Diu 12 A&N Islands 3 1 0 0 0 4 22 5 Total 26,126 3,347 351 131 19 29,974 49,259 33,848 Source: CAA Annual Report, 2015-16 53 Sathianandan, T.V. Marine Fish Production in India, present status. Summer School on Advanced Methods for Fish Stock Assessment and Fisheries Management, 2017 54 http://www.caa.gov.in/uploaded/doc/annualreport/AnnualReport-2015-2016.pdf accessed 22 April 2019 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 47 18,000 16,000 14,000 12,000 10,000 8,000 6,000 4,000 2,000 0 Figure 2.10: State-wise Registered Aquaculture Farms 2.16.5 Tourism and recreation The coastal areas worldwide are major destinations for tourism, which represents the fastest growing sector of the global economy. Tourism could also have harmful effects, leading to unsustainable coastal development as infrastructure is built on the shoreline to accommodate tourism. Coastal tourism activities may be consumptive or non- consumptive types. The consumptive type includes fishing, shell-fishing, and shell collection while swimming, diving, boating, surfing, bird-watching, snorkelling, etc., come under the non-consumptive type. Other classifications are based on the type of coastal destination; namely beach or resort/homestay or time/duration of stay (day or night tourism). Tourism in India today has a contribution of 6.23 percent to the national GDP and 8.78 percent of the total employment in India and there is greater potential for enhancing tourism along the mainland and Island coasts of India. 2.16.6 Ports and Harbours Over 70 of India’s important cities and towns are located on the coast; many of them developed as port cities. India has twelve major ports (including one corporate port) with two more on the anvil which are administered by the Ministry of Shipping, Government of India. There are also 190 other ports which come under the jurisdiction of the State where they are located. In 2013-14, the major ports handled cargo Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 48 throughput of 555.487 million tonnes with Kandla ranked at the top55. Non-major ports handled a total traffic of 470.87 million tonnes in 2014-15 up from 11.02 million tonnes in 1990-91 and 86.90 million tonnes in 2000-01. Table 2.15: State wise number of ports in India East Coast West Coast State Major Non-major State Major Non-major Port Port Port Port West Bengal 1 01 Gujarat 1 42 Odisha 1 02 Daman & Diu - 02 Andhra Pradesh 1 12 Maharashtra 2 43 Tamil Nadu 3 15 Goa 1 05 Puducherry - 02 Karnataka 1 10 Andaman & 1 23 Kerala 1 13 Nicobar Islands Lakshadweep - 10 Total 7 55 6 125 Source: Data on Non-major ports from Indian Ports Association (http://www.ipa.nic.in/index1.cshtml?lsid=39 as on 28/10/2014) With increasing globalization, port cities have attracted industries and have undergone rapid urbanization. In fact, ports are rarely stand-alone units as they are usually associated with manufacturing hubs (industrial estates), petroleum and chemical complexes and special economic zones/export processing zones. 2.16.7 Fishing ports and harbours A number of fishing harbours and fish landing centres dot the long coast. The major fishing harbours at major ports56 are: • Visakhapatnam • Chennai • Cochin • Kolkata (Roychowk) • Paradip • Mumbai (Sasson Dock) State wise list of fishing harbours is presented in Table 2.16. 55 IPA News: http://www.ipa.nic.in/index1.cshtml?lsid=146 accessed 22 August 2016 56 Handbook on Fisheries Statistics 2014. http://www.dahd.nic.in/documents/handbook-fisheries- statistics-2014 accessed 23 Aug. 16 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 49 Table 2.16: States / UT-wise Number of Major, Minor Fishing Harbours and Fish Landing Centres Commissioned / Under Construction till 2011-12 57 Sl. State/ Union Major Fishing Minor Fishing Minor Fish Landing Fish Landing No. Territory Harbours Harbour - Fishing Centres - Centres - Commissioned Commissioned Harbour - Commissioned Under Under Construction Construction 1 Andhra 1 4 17 4 Pradesh* 2 Goa 4 1 3 Gujarat 5 2 21 4 Karnataka 8 4 13 5 Kerala 1 7 9 25 2 6 Maharashtra 1 2 3 35 1 7 Orissa 1 4 1 25 3 8 Tamil Nadu 1 8 3 20 1 9 West Bengal 2 5 13 10 A&N 1 1 4 Island* 11 Daman & Diu 2 12 Lakshadweep 3 13 Puducherry 1 3 1 Total 7 45 25 180 16 2.17 Essential Services in Coastal India Water supply With 2.4 per cent of the world’s land area, India is home to about 17 percent of the total world population but has only about 4 per cent of the world’s renewable freshwater resources (Ministry of Water Resources, 2012). In a country like India which is densely and relatively uniformly populated, the growing water demand and the resultant search for newer sources of water is bound to come face-to-face with ecological limits. While per capita renewable water resource availability in 1951 was 5,177 cubic meters (cu.m) per capita per year, this became 1,588 cu.m by 2010, placing the country well within the water-stressed category (CWC, 2010). According to the widely used Falkenmark water stress index, out of the 22 major river basins of India for which there is good quality data, four are water-stressed, 11 are water-scarce and four are facing absolute water scarcity. Only three river basins out of 22 are not facing any level of water stress or scarcity. In addition, ground water is depleting in some parts of the country. According to a study, out of 5,842 numbers of assessed administrative units, 802 units were overexploited, 169 units were critical, and 523 units were semi-critical (CGWB, 2012). The growing water needs of urban areas shall be seen within this context of reducing water availability. Since 2011, the coverage of habitations with over 40 liters per capita per day 57 States / Union Territories-wise Number of Major, Minor Fishing Harbours and Fish Landing Centres Commissioned / Under Construction till 2011-12 https://data.gov.in/catalog/fishing-harbours- fisheries-statistics-2014 accessed 22 August 2016 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 50 (LPCD) rural water supply has however increased to 78 percent, in line with supplying all habitations with sustainable and sufficient drinking water by 2030 as a part of the Sustainable Development Goals. Of these, 57 percent of the population is also covered by Piped Water Supply through public stand posts. Climate change might further reduce the availability of water for urban areas. Salinity intrusion on water sources in coastal areas also necessitates the need for alternate options than ground water. Major issues related to water quality encountered in the coastal aquifers include salinity and the presence of chemical constituents such as iron, nitrate, etc. Documented cases of sea water ingress in coastal aquifers are restricted to Minjur near Chennai, Puducherry and Tuticorin in Tamil Nadu and Mandvi-Mundra and Okha Madhavpur areas of Kachchh and Saurashtra coasts of Gujarat. Freshwater-saline water interface has been demarcated in the Sourashtra coast along Okha Maliya (Gulf of Kachchh), which was 10-20 km inland parallel to the coastline in 2004, while along Okha Madhavpur section, it was 10-12 km inland. In the Madhavpur-Una section (Saurashtra coast), it was 2 to 10 km inland and in the Una-Bhavnagar section (Gulf Khambat), it was close to the coast. In the Minjur area near Chennai, the fresh water-saline water interface is currently about 16 km inland, due to over-exploitation ground water from alluvial deposits near the coast. Localized contamination of ground water due to industrial effluence has also been reported from the coastal areas of West Bengal, Tamil Nadu, and Kerala.58 Sanitation India’s sanitation coverage has gone up from 39 percent in 2014 to more than 80 percent in 2018.59 All states except Bihar, Odisha, Puducherry, and Uttar Pradesh records more than 70 percent coverage by individual household latrines. However, wide coverage of poorly designed septic tanks/toilet pits and disposal of faecal sludge is more of an issue; mainly in denser coastal areas. 2.18 Pollution of Rivers, Marine and Coastal Areas Increasing levels of organic and inorganic pollution in the coastal waters is a cause of concern; due to reduced DO and increased microbial concentration levels; the two important indicators of the health of coastal waters and affecting aquatic organisms. Some of the major sources of pollution include sewage, municipal waste, aquaculture wastes, industrial waste / waste water, ship building/ship breaking yard wastes, port and harbour wastes, dumping of waste, ballast water and oil spill and bilge, waste and waste water from fish processing industries/salt pans, and tourist resorts. Critical species including coral reefs are undergoing rapid destruction due to destructive fishing techniques and reef mining for calcium carbonate production, overfishing 58 http://cgwb.gov.in/WQ/Costal%20Report.pdf 59 Iyer, P. 2018. Infrastructure and Investments in Water and Sanitation in India: Background Note, Ministry o Finance, Government of India Accessible at: http://ris.org.in/pdf/aiib/31May2018/Background_Note.pdf Accessed on: April 2019 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 51 by small boats, siltation as a result of deforestation, sedimentation, marine pollution and contaminants, sewage and solid waste disposal, irresponsible tourism and fresh water dilution. Polluted River stretches In 2015, CPCB identified 302 polluted river stretches in the country. Under the National water quality monitoring Programme, 445 rivers are being monitored at 1275 locations and organic pollutants are identified as a predominant cause of water pollution. In 2017, CPCB identified 351 as polluted, and in need of restoration of river water quality.60 The assessment of water quality for the identification of Polluted River Stretches in 2017 61has found that there are 31 States and Union Territories having rivers and streams not meeting water quality criteria. The state of Maharashtra has the highest number of 53 polluted river stretches followed by the Assam, Madhya Pradesh, Kerala, Gujarat, Odisha, West Bengal, Karnataka Uttar Pradesh, Goa, Uttarakhand, Mizoram, Manipur, Jammu & Kashmir, Telangana, Meghalaya, Jharkhand, Himachal Pradesh, Tripura, Tamil Nadu, Nagaland, Bihar, Chhattisgarh, Andhra Pradesh, Sikkim, Punjab, Rajasthan, Puducherry, Haryana and Delhi. Sewage It is estimated that 13 coastal states/UTs generate more than 33,215 MLD of sewage. Often, raw sewage disposed directly into coastal waters reduces the DO levels much below the prescribed 5 mg per litre, affecting larvae and juveniles which are very sensitive to DO levels for their survival. Sewage treatment facilities are developed for less than a third of the total sewage generated by coastal cities. A major portion of the sewage is channelized through rivers, streams, creeks, and rivulets, which runs across and along the coastal regions to finally drain into the sea. To reduce the sewage load in to Gulf of Kachchh, 70 MLD Sewage Treatment Plant for Jamnagar District has been undertaken as part of ICZMP. National Coastal Mission aims to enhance the treatment capacity of an estimated 7,500 MLD and 12,000 MLD of sewage and industrial effluent discharge respectively into the sea. Solid Wastes and Marine Plastics Studies on Solid Waste Management in India shows that only around a third of the total waste generated in the country is treated 62. The rate of generation of hazardous wastes in India was 7.467 million tonnes/year as in 2016. Total waste handling capacities (disposal capacity) of Hazardous Waste Treatment facilities in India, is 15,00,568 million tonnes/year which is much less than the present generation of 27,28,326 MTA of land-disposable hazardous wastes. Litter disposal and accumulation in the marine environment is one of the fastest-growing threats to the health of the world's oceans (Pham et al., 2014 63). Marine debris, also known as 60 http://cpcb.nic.in/wqm/PollutedStretches-2018.pdf 61 Ibid 62 http://www.uncrd.or.jp/content/documents/5688[1121]%20India.pdf 63 Pham, C. K., Ramirez-Llodra, E., Alt, C. H. S., Amaro, T., Bergmann, M., Canals, M., et al. (2014). Marine litter distribution and density in European Seas, from the shelves to deep basins. PLoS ONE, 9, e95839. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 52 marine litter, has been defined by UNEP (2009)64 as “any persistent, manufactured or processed solid material discarded, disposed of or abandoned in the marine and coastal environment”. Coastal litter impacts in multiple ways, the most importantly they degrade the quality and health of our oceans, damage coastal and marine habitats and harm marine biota. It is estimated that about 6.4 million tons of marine litter are being disposed of in to the seas annually (UNEP, 2009 65) and that the annual rate of production of plastic has touched 300 million tons in 2010 itself (Thompson et al., 2009 66). Plastics enter into the coastal and marine ecosystem either directly by illegal dumping or accidental loss of debris during fishing /cargo operations and oil rigs or indirectly by way of wind, rivers, streams, and storm drains. A study conducted on the beach litter the coastal states of India67 showed that Odisha coast has the lowest (0.31 g/m2) quantity and Goa coast (205.75 g/m2) the highest quantity of beach debris. Archipelagic coasts of Andamans and Lakshadweep recorded values higher than Kerala, Tamil Nadu, Andhra Pradesh, Odisha, and West Bengal. Samples of debris collected from beaches revealed that all the items were domestic and anthropogenic discards. Plastic litters such as single use carry bags and sachets of soft drinks, edible oils, detergents, beverages, cases of cosmetics, toothpaste, PET bottles, ice cream containers, etc., recorded the highest mean of 25.47g/m2 from Goa coast and the lowest (0.08 g/m2) from Odisha. As per a study conducted by National Institute of Ocean Technology (NIOT), Chennai; in Kerala, microplastics were found in all sediment samples of Vembanad Lake (a Ramsar site); while in Daman & Diu, plastic particles were found in the stomach of a Longman’s Beaked Whale. Fishes and clams are the major source of protein for the local population. The presence of microplastics in these is hence a severe threat, which contaminates the food web of this lake. The analysis of sediment samples from a remote coral island in the Indian Ocean indicates the presence of macro, meso and microplastics. Micro-plastics containing toxic chemicals are among the biggest components in marine litter. In 2012, ‘Manila Declaration of Furthering the Implementation of the Global Programme of Action for the Protection of the Marine Environment from Land- based Activities’ was adopted to develop policies to reduce and control waste water, marine litter, and pollution from fertilizers. 2.19 Institutional Baseline This section discusses the major institutions involved in managing the coastal environment in India. 64 UNEP, 2009. Marine Litter: A Global Challenge. Nairobi: UNEP. 232 pp. 65 Ibid 66 R.C. Thompson, C.J. Moore, vom Saal, F.S. and Swan, S.H. Plastics, the environment and human health: current consensus and future trends, Philos. Trans. R. Soc. B, 364 (2009), pp. 2153-2166 67 Kaladharan etal, 2014. Prevalence of marine litter along the Indian beaches : A preliminary account on its status and composition, CMFRI, Kochi Available at: http://eprints.cmfri.org.in/12330/1/JMBAI_59_1_2017_Kaladharan%20P_Prevalence%20of%20 marine%20litter%20along.pdf Accessed on: April 2019 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 53 2.19.1 Ministry of Environment, Forests and Climate Change MoEFCC 68 is the nodal agency in the Government of India for the planning, promotion, co-ordination and overseeing the implementation of India’s environmental and forestry policies and programmes relating to conservation of the country’s natural resources and prevention and abatement of pollution. While implementing these policies and programmes, the Ministry is guided by the principle of sustainable development and enhancement of human well-being. The Ministry also serves as the nodal agency in the country for the United Nations Environment Programme (UNEP), South Asia Co-operative Environment Programme (SACEP), International Centre for Integrated Mountain Development (ICIMOD) and for the follow-up of the United Nations Conference on Environment and Development (UNCED). The Ministry is also entrusted with issues relating to multilateral bodies such as the Commission on Sustainable Development (CSD), Global Environment Facility (GEF) and of regional bodies like Economic and Social Council for Asia and Pacific (ESCAP) and South Asian Association for Regional Co-operation (SAARC) on matters pertaining to the environment. The Ministry has ten regional offices, seven subordinate offices, six autonomous organizations, four authorities/boards and two institutes including NCSCM functioning under it. In 1986, the Environment (Protection) Act (EPA, 1986) came into existence as an Umbrella Act to protect the environment. Subsequently, the MoEFCC introduced the Coastal Regulation Zone (CRZ) Notification in 1991 under the Environment Protection Act, 1986; subsequently reissued in 2011 and 2019. The National and State Coastal Zone Management Authorities (NCZMA and SCZMAs) have been delegated with powers to manage the coastal zones of the country. Two organisations, the Society of Integrated Coastal Management (SICOM) and NCSCM have been formed under the aegis of MoEFCC as part of the ICZM Project supported by the World Bank. MoEFCC is the nodal ministry of the Government of India for ICZMP and ENCORE Programs. 2.19.1.1 Society of Integrated Coastal Management SICOM, under MoEFCC; is the National Project Management Unit for ICZMP and ENCORE Programs. SICOM has been established under the aegis of the MoEFCC, Government of India with a vision for vibrant, healthy and resilient Coastal and Marine Environment for continuous and enhanced outflow of benefits to the Country and the Coastal Community. Objectives and functions of SICOM are69: • To Support implementation of the Integrated Coastal Zone Management (ICZM) activities in India. 68 Introduction http://moef.gov.in/about-the-ministry/introduction-8/ accessed 23 Apr. 19 69 http://sicom.nic.in/about-us/about-sicom Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 54 • To promote Research & Development (R&D) and stakeholder participation in management of the Coastal areas in India. • To support to check violations to CRZ through improved technology-enabled enforcement, strengthened institutions, and regulatory and legal reform. • SICOM is the National Project Management Unit of India in strategic planning, management, execution, monitoring and successful implementation of the ICZMP- Phase-I. • Based on the success of the Phase-I of the ICZM project SICOM is entrusted to implement and extend the project to all the 13 Coastal States/UTs under Phase-II of the ICZM Project. An in-principle approval from DEA, Ministry of Finance, is obtained to extend the ICZM Project to all the 13 Coastal States/UTs (Maharashtra, Gujarat, Odisha, West Bengal, Andhra Pradesh, Tamil Nadu, Goa, Puducherry, Kerala, Karnataka, Daman and Diu, Andaman and Nicobar Island, Lakshadweep). Preparatory activities for the Phase-II (ENCORE) is in progress. • SICOM has also embarked upon the Pilot Project Blue Flag Beach programme first time in India, identifying one beach each in all 13 Coastal States/UTs. The main objective programme is to promote sustainable development in coastal regions of India for the beach management authorities to strive to achieve high international standards in four categories of: o Environmental Management including cleanliness, solid waste management in beaches. o Environment Education. o Safety & Security of Beachgoers. o Bathing Water Quality Standards. • SICOM has initiated the above process in 13 pilot beaches (one pilot beach in every Coastal States/UTs) under this programme and in line with Swachh Bharat Abhiyan. • To undertake any additional work or function as may be assigned by MoEFCC from time to time in the areas of coastal management and other related activities. 2.19.1.2 National Centre for Sustainable Coastal Management NCSCM, under MoEFCC; GoI has the following vision and mission that would aid in better protection, conservation, rehabilitation, management and policy design of the coast. It would promote integrated and sustainable management of coastal and marine areas in India and advise the Union and States/ Union Territory Governments and other associated stakeholders on policy, and scientific matters relating to ICZM. Vision: Promote sustainable coasts through increased partnerships, conservation practices, scientific research and knowledge management for the benefit and well-being of current and future generations Mission and Role: Support integrated management of coastal and marine environment for livelihood security, sustainable development and hazard risk management by enhancing Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 55 - Knowledge - Research and Advisory Support - Partnerships and Network - Coastal Community Interface Consortium Partner Institutions: Fourteen institutions from coastal states have formed a consortium with NCSCM and signed the Anna University Declaration on 21 June 2010 Scientific Divisions of NCSCM - Coastal Environmental Impact Assessment (CIA) Cumulative Environmental Impact Assessment (CESIA) & real-time, long-term monitoring of critical coastal ecosystems - Integrated Island Management (IIM) Framework for development of Island Management Plan for conservation and socio-economic sustainability of India's islands - Coastal and Marine Resources Conservation (CMR) Conservation of Ecologically Sensitive Areas (ESAs) and demarcation of Critically Vulnerable Coastal Areas - Integrated Social Sciences and Economics (ISE) Community and livelihood issues, valuation of coastal ecosystem goods and services to support Integrated Coastal Zone Management - Futuristic Research (FTR) Measurement of Blue Carbon sequestration & real-time greenhouse gas emission from coastal ecosystems to develop long-term climate change scenarios - Knowledge, Governance and Policy (KGP) Preparation of ICZM Plan and knowledge management for coastal governance and policy. Develop capacity in coastal zone management for all stakeholders - Geospatial Sciences (GEO) Development of science-based decision support using state of-art technology in Remote Sensing and Geographic Information System (GIS) 2.19.1.3 National Coastal Zone Management Authority The National Coastal Zone Management Authority (NCZMA) is constituted by the Central Government exercising powers conferred by sub-sections (1) and (3) of section 3 of the Environment (Protection) Act, 1986 (29 of 1986) for the purposes of protecting and improving the quality of the coastal environment and preventing, abating and controlling environmental and social pollution in the coastal areas. The Authority has been tasked with dealing with all environmental and social issues relating to coastal regulation zone which may be referred to it by the Central Government. The Authority was constituted last on 6th October 2017 and has a term of two years. The major functions of the NCZMA are: Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 56 • co-ordinating the actions of the State (S) and Union Territory (UT) Coastal Zone Management Authorities (CZMA) • examine the proposals for changes or modifications in the clarification of Coastal Zone Areas and in the Coastal Zone Management Plans received from the State/UT CZMA • review cases involving violations • provide technical assistance and guidance to concerned authorities in the matters relating to protection and improvement of the coastal environment • examine and accord its approval to area specific management plans, integrated coastal zone management plans and modifications thereof submitted by the State/ UT CZMA As per the Coastal Regulation Zone 2019, the following also come under the purview of the NCZMA: • In the case of CRZ – II, for any change in the norms for the Floor Space Index (FSI) or Floor Area Ratio (FAR), the request has to be made through the state/UT CZMA. The NCZMA will examine various aspects like availability of public amenities, environmental protection measures, etc., and take a suitable decision on the proposal. The CRZ 2019 has also delegated responsibility to accord clearance for permissible and regulated activities in the CRZ. Paragraph 7 of the Notification states that “All development activities or projects in CRZ-I and CRZ-IV areas, which are regulated or permissible as per this notification, shall be dealt with by Ministry of Environment, Forest and Climate Change for CRZ clearance, based on the recommendation of the concerned Coastal Zone Management Authority”. In case of projects in the CRZ-II or CRZ-III which also happen to be traversing through CRZ–I or CRZ-IV areas or both, “CRZ clearance shall, however, be considered only by the Ministry of Environment, Forest and Climate Change, based on recommendations of the concerned Coastal Zone Management Authority”. 2.19.1.4 State and District Coastal Zone Management Authorities The State/ Union Territory Government constitutes the District Coastal Zone Management Authorities (DCZMA) with Collector of the District as its Chairman, to monitor, enforce and implement the provisions of Coastal Regulation Zone at the district level. Proposals seeking clearance under Coastal Regulation Zone Notification are first scrutinized by the DCZMA and then submitted to State Coastal Zone Management Authority (SCZMA). The DCZMA assists the State Coastal Zone Management Authority in discharging the expected duties apart from attending to the local issues concerned with the Coastal Regulation Zones. The SCZMA is designated as having the power to take various measures for protecting and improving the quality of the coastal environment and preventing, abating and controlling environmental pollution in areas of the respective State/UT. These include: Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 57 • examination of proposals for changes/ modifications in classification of Coastal Regulation Zone areas and in the Coastal Zone Management Plan (CZMP) received from the State Government and • making specific recommendations to the National Coastal Zone Management Authority • inquiry into cases of alleged violation of the provisions of the said Act • identify ecological sensitive areas • identify areas vulnerable to erosion/degradation in the CRZ and • formulate area specific plans for their management etc. 2.19.2 Science and information available for evidence-based decision making 2.19.2.1 Coastal Hazard Line for Coastal Planning CRZ Notification 201970 explains Coastal Hazard Line as follows: “A ‘Hazard line’ has been demarcated by the Survey of India (SOI) as part of ICZMP, taking into account the extent of the flooding on the land area due to water level fluctuations, sea level rise and shoreline changes (erosion or accretion) occurring over a period of time. The hazard line mapped by SOI has been shared with the coastal States or Union territories through NCSCM. The hazard line shall be used as a tool for disaster management for the coastal environment, including the planning of adaptive and mitigation measures. With a view to reduce the vulnerability of the coastal communities and ensuring sustainable livelihood, while drawing the CZMP, the land use planning for the area between the Hazard line and High Tide Line (HTL) shall take into account such impacts of climate change and shoreline changes. 2.19.2.2 Demarcation of High Tide Line and Low Tide Line MoEFCC has authorised eight (8) agencies of national importance to demarcate the HTL and Low Tide Line (LTL) in the CRZ. The Coastal State Governments and Union Territory administrations are requested to take up the demarcation of HTL and LTL along the CRZ with the assistance of any of the 8 agencies which include: i) Space Application Centre, Ahmedabad ii) Centre for Earth Science Studies, Thiruvananthapuram iii) Institute for Remote sensing, Anna University, Chennai iv) Institute for Wetland Management and Ecological Design, Calcutta v) Naval Hydrographer’s Office, Dehradun vi) National Institute of Oceanography, Panaji, Goa vii) National Institute of Ocean Technology, Chennai 70 MoEFCC 2019. CRZ Notification; Annexure IV, Guidelines for Preparation Of Coastal Zone Management Plans Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 58 viii) NCSCM, Chennai CRZ Notification 201971 explains that Demarcation of HTL and LTL as carried out by NCSCM for the entire coastline of the country has been made available to the Coastal States or Union territories and only such demarcation of HTL and LTL shall be applicable for all purposes of this notification. 2.19.2.3 Eco-Sensitive Areas The Coastal Regulation Zone Notification, 2011 under the Environment (Protection) Act, 1986 has listed various coastal ecosystems, including Mangroves, corals and coral reefs and associated biodiversity, turtle and bird nesting grounds, horseshoe crab habitats, sea grass beds, geomorphological features (sand dunes, sandy beaches, biologically active mud flats), and other areas such as archaeological and heritage sites, national parks, sanctuaries and reserve forests, salt marshes, as Ecologically Sensitive Areas (ESAs). As per CRZ Notification 2019; (i) All ESAs shall be identified and boundary delineated by NCSCM using satellite data, (ii) The State Governments or Union territory Administrations through the authorised agencies shall prepare CZMP as per the guidelines contained in this notification highlighting the conservation and protection of the ESAs, (iii) Those activities permissible under the notification shall be included in the CZMP. A framework has been developed for the identification and demarcation of Highly Sensitive Zones within the coastal ecosystems using scientific criteria. The sensitivity thresholds would aid in the preparation of location-specific Conservation Management Plans. A Digital Architecture for hosting the spatial, ecological and health data of coastal ecologically sensitive areas has been developed to serve as a National Knowledge System on coastal ESAs. 2.19.2.4 Critically Vulnerable Coastal Areas (CVCAs) CRZ, 2011 Notification identified 12 sites along the coast of India as CVCAs for conservation ecologically sensitive areas involving the community. As per CRZ Notification, 2019; CVCAs shall be accorded special consideration for the purpose of protecting the critical coastal environment and difficulties faced by local communities. Sundarban region of West Bengal and other ecologically sensitive areas identified as under Environment (Protection) Act, 1986 such as Gulf of Khambat and Gulf of Kutch in Gujarat, Malvan, Achra-Ratnagiri in Maharashtra, Karwar and Koondapur in Karnataka, Vembanad in Kerala, Gulf of Mannar in Tamil Nadu, Bhitarkanika in Odisha, Coringa, East Godavari and Krishna in Andhra Pradesh shall be treated as Critical Vulnerable Coastal Areas (CVCAs) and managed with the involvement of coastal communities including fisher folk who depend on coastal resources for their sustainable livelihood. 71 Ibid Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 59 This baseline assessment presents the environmental and social sensitivities, challenges and opportunities for coastal development in India. Coastal India is rich in its resources and economic potential; which if appropriately and sustainably utilised could support its economic development and livelihoods. This explains the need for integrated planning based on the comprehensive strategic environmental and social assessment approach to take care of the placement and suitability of projects in the coastal space. ICZM Plan; which is a strategic plan based on comprehensive environmental and social assessments and consultations is hence a necessity for coastal planning. In addition, moderate to low risks/impacts on the environmental and social components during project implementation shall be taken care of by developing appropriate mitigation measures and monitoring mechanisms arrived at through project level environmental and social assessments. It is important to have an appropriate institutional structure to implement and monitor the mitigation measures during various project stages. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 60 CHAPTER 3. REGULATORY FRAMEWORK The Environmental Management Framework is “… an instrument that examines the risks and impacts when a project consists of a program and/or series of sub-projects, and the risks and impacts cannot be determined until the program or sub-project details have been identified. The ESMF sets out the principles, rules, guidelines and procedures to assess the environmental and social risks and impacts. It contains measures and plans to reduce, mitigate and/or offset adverse risks and impacts, provisions for estimating and budgeting the costs of such measures, and information on the agency or agencies responsible for addressing project risks and impacts, including on its capacity to manage environmental and social risks and impacts”. Applicable National and State regulations and the World Bank Operational Policies need to be considered for effective management of environmental and social aspects; including siting criteria, environmental pollution control requirements, need for institutional mechanisms, occupational health and safety requirements, resource utilisation and considerations for cultural and social aspects. 3.1 Environmental Laws / Regulations Applicable for ENCORE There are several laws and policies applicable to ENCORE subprojects in the coastal areas. Highlights of some of the key laws and policies are given in Figure 3.1. Prohibited/regulated/permitted activities under various environment acts in India is presented in Annexure III. Figure 3.1: Legislation and Policy Instruments directly / indirectly Applicable to some Subprojects Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 61 3.1.1 National Environment Policy, 2006 In 1986, India brought out a National Environment Policy (NEP, 2006). The section on Coastal Resources in this policy refers to the diverse set of natural and manmade assets that provide habitats for marine species, which, in turn, comprise the resource base for livelihoods of coastal communities and sustainable tourism, and also serves as protection from extreme weather events. The document also highlights the increasing degradation of coastal resources, indicating the causative factors as poor planning, improper location of industries and infrastructure, pollution from industries and settlements, and overexploitation of living natural resources and indicates the potential adverse impacts of sea level rise due to climate change in the future. According to the NEP, the deeper root causes of the problems were inadequate institutional capacities and poor participation by local communities in the formulation and implementation of coastal management plans. Hence, though developmental activities are regulated by means of the Coastal Regulation Zone notification and management plans made under them, there is a need to ensure that the regulations are firmly founded on scientific principles, including the physical, natural, and social sciences. This is necessary to ensure effective protection to valuable coastal environmental resources, without unnecessarily impeding livelihoods, or legitimate coastal economic activity, or settlements, or infrastructure development (NEP 2006, 5.1.3.ii). The NEP also recommended a re-visitation of the CRZ 1991 to ensure a more holistic approach and called for the preparation of CZM Plans with a strong scientific base and extensive local participation towards both formulation and implementation. 3.1.2 National Policy on Marine Fisheries, 2017 The overarching goal of the National Policy on Marine Fisheries, 2017 is to ensure the health and ecological integrity of the marine living resources of India’s Exclusive Economic Zone (EEZ) through sustainable harvests for the benefit of present and future generations of the nation. The objective of this policy is to ensure a sustainable harvest for securing the benefits of present and future generations. This policy will safeguard the health and ecological integrity of the marine living resources of India’s EEZ. Some of the fisheries management strategies include fishing effort management; fleet size optimization; mainstreaming biodiversity conservation in production processes; species-specific and area-specific management plans, including conservation of Ecologically and Biologically Significant Areas and Vulnerable Marine Ecosystems; protection of iconic, endangered and threatened species. The Government will also undertake review and periodic evaluation of the existing marine protected areas for providing legislative support to ensure that tenure rights of the traditional fishermen are secured, and their livelihoods not impacted by such conservation measures. With a focus on actions against overexploitation of marine resources certain measures will be undertaken such as input and output controls such as fleet size, fishing days, area of Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 62 operation, engine horsepower, gear size, maximum sustainable yield (MSY), minimum mesh size, minimum legal size, diverting effort to areas which are relatively less harvested, fleet plans, and creating fisheries management areas to ensure that resource depletion is contained. To incorporate the rights of all stakeholders existing measures such as Territorial Use Rights for Fisheries will be promoted. The Ecosystem Approach to Fisheries Management (EAFM) will consider the integrated wellbeing of the marine and coastal resources and stakeholders. Further, participatory management or co- management in fisheries will be promoted. 3.1.3 National Policy on Disaster Management, 2009 The National Policy on Disaster Management (NPDM) was approved on 22 October 2009 with the vision “To build a safe and disaster resilient India by developing a holistic, proactive, multi-disaster oriented and technology driven strategy through a culture of prevention, mitigation, preparedness, and response”. NPDM provides for an integration approach for management with emphasis on building strategic partnerships at various levels. The primary responsibility for the management of disaster rests with the State Government concerned. The institutional mechanism put in place at the Centre, State and District levels help states to manage disasters in an effective manner. The National Policy on disaster management puts in place an enabling environment for all. India is also a signatory to the Sendai Framework for Disaster Risk Reduction, 2015- 2030 which identifies investing in Disaster Risk Reduction for resilience and to build back better in reconstruction as priorities for action towards reducing disaster risk. Goal Nine (9) of the Sustainable Development Goals (SDGs) recognizes disaster resilient infrastructure as a crucial driver of economic growth and development. 3.1.4 Environment Protection (Act) 1986 The Environment (Protection) Act was enacted in 1986 with the objective of providing for the protection and improvement of the environment. It empowers the Central Government to establish authorities (under section 3(3)) charged with the mandate of preventing environmental pollution in all its forms and to tackle specific environmental problems that are peculiar to different parts of the country. The Act was last amended in 1991. The Environment (Protection) Rules, 1986 set the standards for emissions or discharge of environmental pollutants, prohibitions and restrictions on the location of industries and the carrying on processes and operations in different areas and related activities. The powers conferred by the Environment Protection Act are followed under various heads including: • Coastal Regulation Zone • Eco-marks Scheme Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 63 • Eco-sensitive Zone • Environmental Clearance – General • Environmental Standards • Hazardous Substances Management • Noise Pollution • Ozone Layer Depletion • Water Pollution The Environment (Protection) Act also allows areas to be designated with varying degrees of protection when designated as ecologically sensitive zones/ eco-sensitive zones, though as of now, no such designation has been made with specific reference to climate change. Two areas along the coast that have been designated as eco-sensitive zones are Dahanu and Murud-Janjira in Maharashtra. 3.1.5 Coastal Regulation Zone Notification The CRZ Notification was first issued in 1991 and has since been reissued twice, in 2011 and 2019. CRZ, 1991 declared ‘the coastal stretches of seas, bays, estuaries, creeks, rivers and backwaters which are influenced by tidal action (in the landward side) up to 500 metres from the HTL and the land between the LTL and the HTL as Coastal Regulation Zone’. The definition was expanded in 2011 to include the territorial waters (upto 12 nautical miles). The CRZ is further divided into four classes. In 1991, CRZ IV referred to the island territories but in 2011 and 2019, a separate notification has been issued for managing coasts of islands. The four classes in CRZ, 2019 are: CRZ I: IA: areas are environmentally most critical including ecologically sensitive areas (ESA) and the geo-morphological features which play a role in maintaining the integrity of the coast IB: intertidal areas CRZ II: developed land areas up to or close to the shoreline, within the existing municipal limits or in other existing legally designated urban areas, which are substantially built-up with a ratio of built-up plots to that of total plots being more than 50 per cent and have been provided with drainage and approach roads and other infrastructural facilities, such as water supply, sewerage mains, etc. CRZ III: Land areas that are relatively undisturbed (viz. rural areas, etc.) and those which do not fall under CRZ-II Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 64 CRZ IIIA: areas with population density more than 2161 per square kilometre as per the 2011 census base. CRZ IIIB: areas with a population density of less than 2161 per square kilometre as per the 2011 census base. CRZ IV: Water Area CRZ IVA: water area and the sea bed area between the LTL up to twelve nautical miles on the seaward side CRZ IVB: water area and the bed area between LTL at the bank of the tidal influenced water body to the LTL on the opposite side of the bank, extending from the mouth of the water body at the sea up to the influence of tide, i.e., salinity of five parts per thousand (ppt) during the driest season of the year. In addition to the four classes, the CRZ 2019 also includes areas that require special consideration in the CRZ. These include: • Critically Vulnerable Coastal Areas (CVCA) • CRZ for inland Backwater islands and islands along the mainland coast • CRZ falling within municipal limits of Greater Mumbai 3.1.6 Island Protection Zone Notification In 2011, along with the reissued CRZ Notification, a notification was issued that declared the coastal stretches of Middle Andaman, North Andaman, South Andaman and Greater Nicobar and entire area of the other islands of Andaman and Nicobar and the Lakshadweep and their water area upto territorial water limit as the Islands Protection Zone (IPZ) restricting setting up and the expansion of any industry, operations, processes etc., except in the manner provided in the Island Coastal Regulation Zone (ICRZ) and Integrated Islands Management Plans (IIMP). The notification reissued in 2019 declared the coastal stretches of the ten bigger oceanic islands in Andaman & Nicobar viz., Middle Andaman, North Andaman, South Andaman, Great Nicobar, Baratang, Havelock, Little Andaman, Car Nicobar, Neil and Long islands and the water area up to territorial water limits of the country, as the Island Coastal Regulation Zone (ICRZ). There are four classes under ICRZ: • ICRZ-I: includes ecologically sensitive areas and the geo- morphological features which play a role in maintaining the integrity of the coast; the intertidal zone, • ICRZ-II: the developed land areas up to or close to the shoreline, within the existing municipal limits or in other existing legally designated urban areas, which are substantially built-up with a ratio of built up plots to that of total plots being more Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 65 than 50 percent and have been provided with drainage and approach roads and other infrastructural facilities, such as water supply and sewerage mains etc., • ICRZ-III: Land areas that are relatively undisturbed (viz rural areas etc) and those do not fall under ICRZ-II, shall constitute ICRZ –III, • ICRZ-IV: water area and the sea bed area between the LTL up to twelve (12) nautical miles on the seaward side and water area and the bed area between LTL at the bank of the tidal influenced water body to the LTL on the opposite side of the bank, extending from the mouth of the water body at the sea up to the influence of tide, i.e., salinity of five parts per thousand (ppt) during the driest season of the year. 3.1.7 EIA Notification This notification was first issued in 1994. It was reissued with greater details in 2006 (and is further in the process of amendment in 2018) and states that construction of new projects or activities or the expansion or modernization of existing projects or activities listed in the Schedule to this notification entailing capacity addition with change in process and or technology shall be undertaken in any part of India only after the prior environmental clearance from the Central Government (Category A projects) or as the case may be, by the State Level Environment Impact Assessment Authority (Category B Projects). Where state level authorities have not been constituted, the clearance would be provided by the MoEFCC. Obtaining Prior Environmental Clearance is a four-step process (Figure 3.2). Figure 3.2: Overview of the EIA Process in India As per the CRZ 2019 Notification, ‘Projects or activities which attract the provisions of this notification as also the provisions of EIA notification, 2006 number S.O. 1533(E), dated the 14 September 2006, shall be dealt with for a composite Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 66 Environmental and CRZ clearance under EIA Notification, 2006 by the concerned approving Authority, based on recommendations of the concerned Coastal Zone Management Authority. In the case of Category A projects, it would be the MoEFCC and in the case of Category B projects, it would be the state/ UT Environmental Impact Assessment Authority (SEIAA). In the case of projects in CRZ areas, the Infrastructure and Miscellaneous Projects + CRZ committee is tasked with appraisal of projects. 3.1.8 Wildlife Protection Act, 1972 The Wildlife (Protection) Act, 1972 provides for both species-specific and spatial conservation strategies. Specifically, Chapter IV of the Act provides details of the declaration of sanctuaries, national parks, and closed areas. Under the Act, currently, there are 24 Marine Protected Areas in peninsular India and more than 100 Marine Protected Areas in the country's islands. The 24 Marine Protected Areas of the mainland have a total area of about 8214 km2, which is about 5 percent of the total protected area network of India and represents 0.25 percent of the total geographic area of the country (Sivakumar et al., 2014). Some of the important designated Marine protected Areas in mainland India are the Gulf of Kachchh Marine National Park, the Gulf of Mannar Marine National Park, Bhitarkanika National Park, Coringa Wildlife Sanctuary, Chilika Wildlife Sanctuary and Sundarban National Park. Since these are also included under CRZ-I of the CRZ 2011 Notification, development regulations apply to these too. 3.1.9 Forest Act The Forest Conservation Act, 1980 prevents the conversion of forest land for other purposes except through the permission of the Central Government. The Biological Diversity Act, 2002, contains provisions that aim at preserving biodiversity as well as establishing a system for equitable sharing of benefits arising from the use of traditional biological resources and knowledge. Biodiversity Heritage Sites may be declared under this Act (Section 37) and Biodiversity Management Committees shall be constituted not only for biodiversity conservation but also for documentation and chronicling of biodiversity related knowledge. With respect to climate change, this would refer to knowledge on land races, cultivars, etc., that can be used under different climate regimes. Several laws are enacted at the State level, and these may vary from state to state. For example; regulations such as Floor space Index (FSI) and Floor Area Ratio (FAR) of buildings are overseen by Town and Country Planning Agencies and Local Bodies (Building Rules) and vary from state to state. Similarly, in the case of marine fisheries, each state has enacted its version of the Marine Fishing Regulation Act based on a framework provided. The environmental safeguards framework aims at incorporating environmental considerations into the project design and development process to make the projects sustainable. The Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 67 important and relevant environmental legislations in India and their applicability to ENCORE is presented in tabular form in Annexure III. 3.2 Social Laws / Regulations Applicable for ENCORE 3.2.1 National Policy for Women In 2016, GoI in its Ministry of Women and Child Development formulated a draft of women policy. The policy was formulated a decade after the formulation of National Policy for the Empowerment of Women (2001). The objectives of the policy look at (1) creating a conducive socio-cultural, economic and political environment for women, (2) mainstreaming gender in all-round development processes / programmes, (3) a holistic and life cycle approach to women’s health, (4) improving and incentivizing access of women / girls to universal and quality education, (5) improving participation of women in workforce etc. Different priority areas are identified in the policy that are contextually relevant for women, such as (a) health, food security and nutrition, (b) education, (c) economy (includes agricultural activities; poverty reduction; industry, labour and employment, service sector engagement etc.), (d) governance and decision making, (e) violence against women. In the line of National Policy for Women, the Government of Maharashtra has prepared a State policy on Women to protect their rights and entitlement. 3.2.2 Tribal Development and Tribal Sub-Plan (TSP) Approach The tribal situation varies by states where some areas have high tribal concentration while in other areas, the tribals form only a small portion of the total population. The Constitution of India provides a comprehensive framework for the socio-economic development of Scheduled Tribes and for preventing their exploitation by other groups of the society. A detailed and comprehensive review of the tribal problems was taken on the eve of the Fifth Five Year Plan and the Tribal Sub-Plan strategy took note of the fact that an integrated approach to the tribal problems was necessary in terms of their geographic and demographic concentration. The tribal areas in the country were classified under three broad categories, i.e., (1) category 1: States and Union Territories having a majority Scheduled Tribes population, (2) Category 2: States and Union Territories having substantial tribal population but majority tribal population in particular administrative units, such as block and tehsils, and (3) Category 3: States and Union Territories having dispersed tribal population. In the light of the above approach, for the second category of States and Union Territories, tribal sub-Plan approach was adopted after delineating areas of tribal concentration. To look after the tribal population coming within the new Tribal Sub- Plan (TSP) strategy, in a coordinated manner, Integrated Tribal Development Projects were conceived during the Fifth Five Year Plan. During the Sixth Plan, Modified Area Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 68 Development Approach (MADA) was adopted to cover smaller areas of tribal concentration and during the Seventh Plan, the TSP strategy was extended further to cover even more smaller areas of tribal concentration and thus cluster of tribal concentration was identified. At the time of the delineation of project areas under the TSP strategy, it was observed that the ITDPs/ITDAs are not co-terminus. At present, Scheduled Areas have been declared in the States of Andhra Pradesh (including Telangana), Chhattisgarh, Gujarat, Himachal Pradesh, Jharkhand, Madhya Pradesh, Maharashtra, Odisha, and Rajasthan. As per the provisions contained in the Fifth Schedule of the Constitution, various enactment in the forms of Acts and Regulations have been promulgated in the states for the welfare of scheduled tribes and their protection from exploitation. The TSP strategy is having twin objectives, i.e., Socio-economic development of Schedule Tribes and protection of tribal against exploitation, the Government of India in August, 1976 had decided to make the boundaries of Scheduled Areas co-terminus with TSP areas (ITDP/ITDA only) so that the protective measure available to Scheduled Tribes in Scheduled Areas could be uniformly applied to TSP areas for effective implementation of the development programmes in these areas. Accordingly, the TSP areas have been made co-terminus with Scheduled Areas in the State. 3.2.3 Right to Fair Compensation and Transparency in Land Acquisition, Resettlement and Rehabilitation (RFCTLAR&R) Act, 2013 The Right to Fair Compensation and Transparency in Land Acquisition, Resettlement, and Rehabilitation (RFCTLAR&R) Act, 2013, enacted by the Government of India is the latest legislation. This is in force and supersedes all other old acts for land acquisition and to determining R&R activities throughout the country. The act shall apply, when the Government acquires land for its own use, hold and control, including for Public Sector Undertakings and for public purpose. This act specifies that the process of obtaining the consent shall be carried out along with the Social Impact Assessment (SIA) study. The act also has the provision that no land shall be transferred by way of acquisition, in the Scheduled Areas in contravention of any law (including any order or judgment of a court which has become final) relating to land transfer, prevailing in Scheduled Areas. The act defines (1) "affected area" as such area as may be notified by the Government for the purposes of land acquisition; (2) “affected family" includes a family whose land or other immovable property has been acquired; a family which does not own any land but a member or members of such family may be agricultural labourers, tenants including any form of tenancy or holding of usufruct right, share-croppers or artisans or who may be working in the affected area for three years prior to the acquisition of the land, whose primary source of livelihood stand affected by the acquisition of land; (3) the Scheduled Tribes and other traditional forest dwellers who have lost any of their Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 69 forest rights recognised under the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006 due to acquisition of land (4) family whose primary source of livelihood for three years prior to the acquisition of the land is dependent on forests or water bodies and includes gatherers of forest produce, hunters, fisher folk and boatmen, and such livelihood is affected due to acquisition of land. The act further specifies that a member of the family who has been assigned land by the State Government or the Central Government under any of its schemes and such land is under acquisition; and a family residing on any land in the urban areas for preceding three years or more prior to the acquisition of the land or whose primary source of livelihood for three years prior to the acquisition of the land is affected by the acquisition of such land. This Act also provides an institutional mechanism for conducting social impact studies and conducting consultations. Detail provision of the act with regard to compensation, rehabilitation and resettlement are discussed in the section for Resettlement Policy Framework. Some of the State Acts / Rules in this regard are as follows: West Bengal Memorandum of the This memorandum vide Gazette Notification is to ensure the optimal Government of West Bengal, utilization of public funds and early implementation of projects where 2016 direct land purchase from land-owners may become necessary. This memorandum discusses the procedure of the same including publication of notice, fund allocation to the local administrative bodies or department for purchase of land and price determination. Odisha Odisha RFCTLARR Rules, Following the National RFCTLARR Act, 2013, this State Act explains 2015 the process of land acquisition ensuring fair compensation and satisfactory rehabilitation and resettlement. This Act includes processes such as informing the public, settling of land right dues, consultations and SIA study, preparation of social impact management plan with R & R entitlement matrix, publication of all the reports and obtaining consent. This Act also specifies the process for determining the price and compensation, also the parties eligible for compensation, preparation of the draft R & R scheme, public hearings, allocation of land. See also, Land Rights to Slum Dwellers Act, 2017, Odisha direct purchase guideline 2016, Government Order of allotment of homestead land to eligible landless persons 2016 Andhra Pradesh Andhra Pradesh Right to Fair This set of rules provides instructions regarding land acquisition, Compensation and resettlement and compensation for the State of Andhra Pradesh. It Transparency in Land includes the processing of requisition for land acquisition, social impact Acquisition, Rehabilitation and assessment, public hearing, declaration of land acquisition and Resettlement Rules, 2014 compensation. The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Rules of Andhra Pradesh also has provision if an acquired land remains unused for more Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 70 than five years then it shall be returned to the original owner or to the land bank by a notice. Provisions of the Panchayats The salient feature of the Panchayats (Extension to the Scheduled Areas) (Extension to the Scheduled Act, 1996 (PESA) and the modalities worked out to grant rights to tribals Areas) Act, 1996 (PESA) in the country are: applicable to Andhra Pradesh 1. Legislation on Panchayats shall be in conformity with the customary law, social and religious practices and traditional management practices of community resources; 2. Habitation or a group of habitations or a hamlet or a group of hamlets comprising a community and managing its affairs in accordance with traditions and customs; and shall have a separate Gram Sabha. 3. Every Gram Sabha to safeguard and preserve the traditions and customs of people, their cultural identity, community resources and the customary mode of dispute resolution. 4. The Gram Sabhas have roles and responsibilities in approving all development works in the village, identify beneficiaries, issue certificates of utilization of funds; powers to control institutions and functionaries in all social sectors and local plans. Gram Sabhas or Panchayats at appropriate level shall also have powers to manage minor water bodies; power of mandatory consultation in matters of land acquisition; resettlement and rehabilitation and prospecting licenses/mining leases for minor minerals; power to prevent alienation of land and restore alienated land; regulate and restrict sale/consumption of liquor; manage village markets, control money lending to STs; and ownership of minor forest produce. Other acts which may be applicable to this project: Andhra Pradesh Agricultural Land (Conversion for Non-Agricultural Purposes) (Amendment) Act, 2012; Andhra Pradesh Ancient and Historical Monuments and Archaeological sites and Remains (Amendment)Act,2001; Andhra Pradesh Farmers Management of Irrigation Systems Act,1997 Tamil Nadu Tamil Nadu Right to Fair This set of rules comprises instructions regarding land acquisition, Compensation and resettlement, and compensation for the State of Andhra Pradesh. It Transparency in Land includes the processing of requisition for land acquisition, social impact Acquisition, Rehabilitation and assessment, public hearing, declaration of land acquisition and Resettlement Rules, 2017 compensation. Other instructions are such as infrastructural amenities in the resettlement area, provision of additional compensation and fishing rights in case of irrigation or hydel projects. 3.2.4 Panchayati Raj Act As per the 73rd constitutional amendment act, 1992, the panchayats as the local self- government are empowered to plan execute and monitor certain activities as per the activity mapping. As per the status of devolution, 11 subjects have been fully devolved in the State of Maharashtra and 18 subjects/schemes are implemented by the PRIs. The act strengthens the decentralized governance system and promotes bottom-up planning. As per the act, the Gram Panchayat level plans are to be prepared in Gram Sabha which is having an important bearing on the planning process of the proposed project. The act is having both mandatory and discretionary provisions and of the mandatory provisions Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 71 of the Panchayati Raj Act, the most critical are those that strengthen the structure of representative democracy and political representation at the local level. Some of the salient features of the mandatory provisions of the Act are; • The establishment in every state (except those with populations below 2 million) of rural local bodies (panchayats) at the village, intermediate and district levels (Article 243B) • Direct elections to all seats in the panchayats at all levels (Article 243C) • Compulsory elections to panchayats every five years with the elections being held before the end of the term of the incumbent panchayat in the event that a panchayat is dissolved prematurely, elections must be held within six months, with the newly elected members serving out the remainder of the five-year term (Article 243E) • Mandatory reservation of seats in all panchayats at all levels for Davits and Advises in proportion to their share of the panchayat population (Article 243D) • Mandatory reservation of one-third of all seats in all panchayats at all levels for women, with the reservation for women applying to the seats reserved for Davits and Advises as well (Article 243D) • Indirect elections to the position of panchayat chairperson at the intermediate and district levels (Article 243C) • Mandatory reservation of the position of panchayat chairperson at all levels for Davits and Advises in proportion to their share in the state population (Article 243D) • Mandatory reservation of one-third of the positions of panchayat chairperson at all three levels for women (Article 243D) • In addition, the act mandates the constitution of two state-level commissions: an independent election commission to supervise and manage elections to local bodies, much as the Election Commission of India manages state assembly and parliamentary elections (Article 243K); and a state finance commission, established every five years, to review the financial position of local bodies and recommend the principles that should govern the allocation of funds and taxation authority to local bodies (Article 2431). Article 243ZD mandates the constitution of District Planning Committees (DPC) to consolidate the plans prepared by both rural and urban local bodies. In order to facilitate. This is an essential pre-requisite for each tier of the Panchayati Raj system to prepare plans for its areas, as defined through Activity Mapping, and then for all these plans, along with plans of municipalities, to be "consolidated" by the DPC as mandated by Article 243 ZD of the Constitution. 3.2.5 Panchayats (Extension to the Scheduled Areas) Act, 1996 Following the recommendations of the Bhuria Committee, the Parliament extended the provisions of the 73rd Amendment Act to the Scheduled Areas by passing Provisions Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 72 of Panchayats (Extension to the Scheduled Areas) Act (PESA), 1996. This Act, commonly known as PESA, legally recognizes Scheduled Tribe’s own systems of self‐ governance. The Gram Sabha of the village becomes the focal institution, endowed with significant powers. Under section 4(d) of PESA: "every Gram Sabha shall be competent to safeguard and preserve the traditions and customs of the people, their cultural identity, community resources and the customary mode of dispute resolution." PESA legally recognizes the right of tribal communities to govern themselves through their own systems of self-government and also acknowledges their traditional rights over natural resources. The salient feature of the Panchayats (Extension to the Scheduled Areas) Act, 1996 (PESA) and the modalities worked out to grant rights to tribals in the country are: • Legislation on Panchayats shall be in conformity with the customary law, social and religious practices and traditional management practices of community resources; • Habitation or a group of habitations or a hamlet or a group of hamlets comprising a community and managing its affairs in accordance with traditions and customs; and shall have a separate Gram Sabha. • Every Gram Sabha to safeguard and preserve the traditions and customs of people, their cultural identity, community resources and the customary mode of dispute resolution. • The Gram Sabhas have roles and responsibilities in approving all development works in the village, identify beneficiaries, issue certificates of utilization of funds; powers to control institutions and functionaries in all social sectors and local plans. • Gram Sabhas or Panchayats at appropriate level shall also have powers to manage minor water bodies; power of mandatory consultation in matters of land acquisition; resettlement and rehabilitation and prospecting licenses/mining leases for minor minerals; power to prevent alienation of land and restore alienated land; regulate and restrict sale/consumption of liquor; manage village markets, control money lending to STs; and ownership of minor forest produce. • The provisions of Panchayats with certain modifications and exceptions have been extended to the Schedule V areas. In line with the PESA Act, the Government of Andhra Pradesh has introduced Panchayats Extension to Scheduled Areas (PESA) Rules, 2011. Similarly, Maharashtra has formulated rules for the Panchayats (Extension to Scheduled Areas) Act in 2014. 3.2.6 Constitution (Seventy Forth Amendment) Act, 1992 This Act is also known as the Nagarpalika Act which came into force in 1993. This Act empowers the urban local bodies by giving them constitutional status. This acts as a pillar for the decentralization of urban governance in India. Article 243Q provides for the establishment of 3 kinds of Municipalities such as Nagar Panchayat, Municipal Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 73 council and Municipal Corporation. The municipal area will be divided in wards and all the members of the municipality will be elected by the people of the municipality. There shall be ward committees comprising of one or more wards. Reservation of the seats for the Scheduled castes and scheduled tribes in every municipality corporation will be in proportion to their population. Similarly, the reservation of seats for women will be not less than one-third of the total number of seats including seats reserved for women belonging to SC/ST category. The municipal corporations are entrusting with all the basic local level activities which will establish them as local self-governing units. The municipalities will have functions related to – i) the preparation of plans for economic development and social justice; ii) the performance of functions and the implementation of schemes as may be entrusted to them including those in relation to the matters listed in the Twelfth Schedule; The Legislature of a State may, by law,-(a) authorise a Municipality to levy, collect and appropriate such taxes, duties, tolls, and fees in accordance with such procedure and subject to such limits;(b) assign to a Municipality such taxes, duties, tolls and fees levied and collected by the State Government for such purposes and subject to such conditions and limits;(c) provide for making such grants-in-aid to the Municipalities from the Consolidated Fund of the State; and(d) provide for constitution of such Funds for crediting all moneys received, respectively, by or on behalf of the Municipalities and also for the withdrawal of such moneys therefrom.as may be specified in the law (243X). There shall be a committee for district level planning constituted in every State at the district level a District Planning Committee to consolidate the plans prepared by the Panchayats and the Municipalities in the district and to prepare a draft development plan for the district as a whole (243 ZD). Following functions are the additions after the introduction of 12th Schedule; 1. Urban planning including town planning.2. Regulation of land-use and construction of buildings.3. Planning for economic and social development.4. Roads and bridges.5. Water supply for domestic, industrial and commercial purposes.6. Public health, sanitation conservancy and solid waste management.7. Fire services.8. Urban forestry, protection of the environment and promotion of ecological aspects.9. Safeguarding the interests of weaker sections of society, including the handicapped and mentally retarded.10. Slum improvement and upgradation.11. Urban poverty alleviation.12. Provision of urban amenities and facilities such as parks, gardens, playgrounds.13. Promotion of cultural, educational and aesthetic aspects.14. Burials and burial grounds; cremations, cremation grounds and electric crematoriums.15. Cattle pounds; prevention of cruelty to animals.16. Vital statistics including registration of births and deaths.17. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 74 Public amenities including street lighting, parking lots, bus stops and public conveniences.18. Regulation of slaughter houses and tanneries. 3.2.7 Forest Rights Act, 2006 This Act, “Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act”, 2006 grants legal recognition to the rights of traditional forest dwelling communities and makes a beginning towards giving communities and the public a role in forest and wildlife conservation. The Act secures the individual or community tenure or both and gives forest rights of forest dwelling Scheduled Tribes and other traditional forest dwellers on all forest lands, namely:- (a) right to hold and live in the forest land under the individual or common occupation for habitation or for self-cultivation for livelihood by a member or members of a forest dwelling Scheduled Tribe or other traditional forest dwellers; (b) community rights over forest; (c) right of ownership, access to collect, use, and dispose of minor forest produce which has been traditionally collected within or outside village boundaries. The scope of the Act also covers the following rights that are placed on the forest dwelling communities. 1. Community rights of uses or entitlements such as fish and other products of water bodies, grazing (both settled or transhumant) and traditional seasonal resource access of nomadic or pastoralist communities; 2. Community tenures of habitat and habitation for primitive tribal groups and pre- agricultural communities; 3. Rights in or over disputed lands under any nomenclature in any State where claims are disputed; 4. Conversion of leases or grants issued by any local authority or any State Government on forest lands to title; 5. Settlement and conversion of all forest villages, old habitation unsurveyed villages and other villages in forest, whether recorded, notified, or not, into revenue villages; 6. Protect, regenerate, or conserve or manage any community forest resource, which they have been traditionally protecting and conserving for sustainable use; 7. Rights which are recognised under any State law or laws of any Autonomous District Council or Autonomous Regional Council or which are accepted as rights of tribal under any traditional or customary law of concerned tribes of any State; 8. Access to biodiversity and community right to intellectual property and traditional knowledge related to biodiversity and cultural diversity; 9. Any other traditional right customarily enjoyed by the forest dwelling Scheduled Tribes or other traditional forest dwellers, as the case may be, which are not mentioned in clauses (a) to (k) but excluding the traditional right of hunting or trapping or extracting a part of the body of any species of wild animal; 10. In-situ rehabilitation, including alternative land in cases where the Scheduled Tribes and other traditional forest dwellers have been illegally evicted or displaced from Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 75 forest land of any description without receiving their legal entitlement or rehabilitation prior to the 13th of December 2005. 3.2.8 Constitutional Safeguard for Scheduled Tribes "Scheduled Tribes" means such tribes or tribal communities or parts of or groups within such tribes or tribal communities as are deemed under article 342 to be Scheduled Tribes for the purposes of the Constitution. As it is stipulated in the constitution, the President (President of India) may with respect to any State or Union Territory, and where it is a State, after consultation with the Governor thereof, by public notification, specify the tribes, or tribal communities or parts of or groups within tribes or tribal communities which shall for the purposes of this Constitution be deemed to be Scheduled Tribes in relation to that State or Union Territory, as the case may be. With regard to inclusion or exclusion, Parliament may by law include in or exclude from the list of Scheduled Tribes specified in a notification, any tribe or tribal community or part of or group within any tribe or tribal community. Prohibition of Discrimination As per this provision, the States shall not discriminate against any citizen on grounds only of religion, race, caste, sex, place of birth or any of them. Other provisions are; 1. No citizen shall, on grounds only of religion, race, caste, sex, place of birth or any of them, be subject to any disability, liability, restriction or condition with regard to (a.) access to shops, public restaurants, hotels and places of public entertainment; or (b.) the use of wells, tanks, bathing Ghats, roads and places of public resort maintained wholly or partly out of State funds or dedicated to the use of general public. 2. Nothing (clause (2) of article 29) shall prevent the State from making any special provision for the advancement of any socially and educationally backward classes of citizens or for the Scheduled Castes and the Scheduled Tribes. 3. Nothing (sub-clause (g) of clause (1) of article 19) shall prevent the State from making any special provision, by law, for the advancement of any socially and educationally backward classes of citizens or for the Scheduled Castes or the Scheduled Tribes in so far as such special provisions relate to their admission to educational institutions including private educational institutions, whether aided or unaided by the State, other than the minority educational institutions referred to in clause (1) of article 30. 3.2.9 Equality of Opportunity in Matters of Public Employment There shall be equality of opportunity for all citizens in matters relating to employment or appointment to any office under the State. No citizen shall, on grounds only of religion, race, caste, sex, descent, place of birth, residence or any of them, be ineligible for, or discriminated against in respect of, any employment or office under the State. The Central and State Governments can make provision for the reservation of Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 76 appointments or posts in favour of any backward class of citizens which, in the opinion of the Centre/State, is not adequately represented in the services under the State. Protection of Rights All citizens shall have the right (a) to freedom of speech and expression; (b) to assemble peaceably and without arms; (c) to form associations or unions; (d) to move freely throughout the territory of India; (e) to reside and settle in any part of the territory of India; and (g) to practise any profession, or to carry on any occupation, trade or business. 3.2.10 The SCs and the STs (Prevention of Atrocities) Act, 1989 The act was passed in 1989 to prevent Scheduled Castes and Scheduled Tribes from atrocities. The act suggests Precautionary and Preventive Measures. under which State Government shall identify the area where it has reason to believe that atrocity may take place or there is an apprehension of reoccurrence of an offence under the Act: The state shall order the concerned officer to visit the identified area and review the law and order situation. If deemed necessary, in the identified area cancel the arms licenses of the persons, not being a member of the Scheduled Castes or Scheduled Tribes, their near relations, servants or employees and family friends and get such arms deposited in the Government Armoury. The act suggests constitution of a high-power State-level committee, district, and divisional level committees or such number of other committees as deemed proper and necessary for assisting the Government in implementation of the provisions of the Act; The act has made provision to set-up a vigilance and monitoring committee to suggest effective measures to implement the provisions of the Act. The state can set-up Awareness Centres and organise Workshops in the identified area or at some other place to educate the persons belonging to the Scheduled Castes and the Scheduled Tribes about their rights and the protection available to them under the provisions of various Central and State enactments or rules, regulations and schemes framed there under. Under the act, Non-Government Organisations are encouraged for establishing and maintaining Awareness Centres and organizing Workshops and provide them necessary financial and other sort of assistance; As per the provision of the act, the State Governments shall set up a Scheduled Castes and the Scheduled Tribes Protection Cell at the State head quarter under the charge of Director General of Police/Inspector General of Police. This Cell shall be responsible for (i) conducting survey of the identified area; (ii) maintaining public order and tranquillity in the identified area; (iii) recommending to the State Government for deployment of special police force or establishment of special police post in the identified area; (iv) making investigations about the probable causes leading to an offence under the Act; (v) restoring the feeling of security amongst the members of the Scheduled Castes and the Scheduled Tribes; (vi) informing the nodal officer and special Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 77 officer about the law and order situation in the identified area; (vii) making enquiries about the investigation and spot inspections conducted by various officers; (viii) making enquiries about the action taken by the Superintendent of Police in the cases where an officer in-charge of the police station has refused to enter an information in a book to be maintained by that police station; (ix) making enquiries about the wilful negligence by a public servant. Annexure III presents sector wise regulations / Acts applicable for ENCORE with a description of its provisions, applicability to the project and procedures to be followed. 3.2.11 International Treaties At the global level, India has been proactive in contributing to international deliberations towards conservation and management of ecosystems, biological diversity and sustainable utilisation of resources. India is a signatory to various conventions related to the environment (Table 3.1) and in this context, India has also enacted and implemented appropriate legislations and action plans for carrying out its international commitments. Table 3:1 International Environmental Agreements International Treaties Details The Ramsar Convention on The Ramsar Convention is an international treaty for the Wetlands of International conservation and sustainable utilization of wetlands i.e. to stem the Importance, 1971 progressive encroachment on and loss of wetlands now and in the future, recognizing the fundamental ecological functions of wetlands and their economic, cultural, scientific and recreational value. According to the Ramsar list of Wetlands of International Importance, As of February 2019, there are 27 Ramsar Sites in India which are required to be protected. Activities undertaken in the proximity of these wetlands should follow the guidelines of the convention. Vienna Convention for the Adopted in 1985, convention sets the framework for efforts to Protection of the Ozone protect the globe’s ozone layer by means of systematic Layer observations, research and information exchange on the effects of human activities on the ozone layer and to adopt legislative or administrative measures against activities likely to have adverse effects on the ozone layer. Montreal Protocol on The original Montreal Protocol was agreed on 16 September 1987 Substances that Deplete the and entered into force on 1 January 1989. It is designed to protect Ozone Layer (a protocol to the ozone layer by phasing out the production of numerous the Vienna Convention for substances that are responsible for ozone depletion. This treaty also the Protection of the Ozone requires controlling emissions of substances that deplete ozone. Layer) Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 78 International Treaties Details United Nations Framework This framework came into force on 21 March 1994 and aims to Convention on Climate achieve stabilization of greenhouse gas (GHG) concentrations in the Change (UNFCCC (1992)) atmosphere at a level low enough to prevent dangerous anthropogenic interference with the climate system. Basel Convention on the This convention came into force in 1992 and aims to reduce the Control of Transboundary amount of waste produced by signatories and regulates the Movements of Hazardous international traffic in hazardous wastes. Wastes and their Disposal (1989) Stockholm Convention on Treaty to protect human health and the environment from chemicals Persistent Organic that remain intact in the environment for long periods, become Pollutants (POPs) widely distributed geographically, accumulate in the fatty tissue of humans and wildlife, and have harmful impacts on human health or on the environment. Signed in 2001 and effective from May 2004 Rotterdam Convention on To promote shared responsibility and cooperative efforts among Prior Informed Consent Parties in the international trade of certain hazardous chemicals to (PIC) for certain Hazardous protect human health and the environment from potential harm; Chemicals and Pesticides in covers pesticides and industrial chemicals that have been banned or International Trade severely restricted for health or environmental reasons. UNEP Minamata Adopted on 10 October 2013, this global treaty aims to protect Convention on Mercury human health and the environment from the adverse effects of mercury. Strategic Approach to SAICM’s overall objective is the achievement of the sound International Chemicals management of chemicals throughout their life cycle so that by the Management (SAICM) year 2020, chemicals are produced and used in ways that minimize significant adverse impacts on the environment and human health. Convention on Biological International legally binding treaty opened for signature at the Diversity (CBD), commonly United Nations Conference on Environment and Development Biodiversity (UNCED) in 1993. The objectives of this Convention, to be pursued in accordance with its relevant provisions, are the conservation of biological diversity, the sustainable use of its components and the fair and equitable sharing of the benefits arising out of the utilization of genetic resources. Convention on the Intergovernmental treaty, concluded under the aegis of the UNEP, Conservation of Migratory concerned with the conservation of wildlife and habitats on a global Species (CMS or Bonn scale. It is the only global convention specializing in the Convention) conservation of migratory species, their habitats and migration routes. The treaty aims to conserve terrestrial, aquatic and avian migratory species throughout their range. India entered the force of CMS on 1.11.1983. Agreement on the An independent international treaty developed under the auspices of Conservation of African- the UNEP's Convention on Migratory Species. India is a party to Eurasian Migratory Water this agreement. birds (AEWA) Aims to establish coordinated conservation and management of migratory water birds throughout their entire migratory range. It Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 79 International Treaties Details covers 255 species of birds ecologically dependent on wetlands for at least part of their annual cycle. Convention concerning the WHC sets out the duties of States Parties in identifying potential Protection of the World sites and their role in protecting and preserving them. By signing Cultural and Natural the Convention, each country pledges to conserve not only the Heritage World Heritage sites situated on its territory, but also to protect its national heritage. The States Parties: integrate the protection of the cultural and natural heritage into regional planning programmes, set up staff and services at their sites, undertake scientific and technical conservation research and adopt measures which give this heritage a function in the day-to-day life of the community. It explains how the World Heritage Fund is to be used and managed and under what conditions international financial assistance may be provided. States Parties to report regularly to the World Heritage Committee on the state of conservation of their World Heritage properties and to strengthen the appreciation of the public for World Heritage properties and to enhance their protection through educational and information programmes Date of Adoption was 16 Nov 1972 This came into force on 17 Dec 1975 India signed the convention on 14 Nov 1977 Convention on International CITES is a multilateral treaty to protect endangered plants and Trade in Endangered animals. Its aim is to ensure that international trade in specimens of Species of Wild Fauna and wild animals and plants does not threaten the survival of the species Flora in the wild, and it accords varying degrees of protection to more than 35,000 species of animals and plants. Date of Adoption was 3 Mar 1973 This came into force on 1 Jul 1975 India signed the convention on 20 Jul 1976 United Nations Convention UNCLOS; the Law of the Sea Convention defines the rights and on the Law of the Sea responsibilities of nations with respect to their use of the world's oceans, establishing guidelines for businesses, the environment, and the management of marine natural resources. Date of Adoption was 10 Dec 1982 This came into force on 16 Nov 1994 India signed the convention on 10 Dec 1982 United Nations Fish Stocks UNFSA aims to ensure the long-term conservation and sustainable Agreement use of straddling and highly migratory fish stocks within the framework of UNCLOS. Date of Adoption was 4 Aug 1995 This came into force on 11 Dec 2001 India signed the convention on 19 Aug 2003 (accession) Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 80 International Treaties Details Rotterdam Convention on PIC is a multilateral treaty to promote shared responsibilities in the Prior Informed Consent relation to the importation of hazardous chemicals. The convention Procedure for Certain promotes an open exchange of information and calls on exporters of Hazardous Chemicals and hazardous chemicals to use proper labelling, include directions on Pesticides in International safe handling, and inform purchasers of any known restrictions or Trade bans. Signatory nations can decide whether to allow or ban the importation of chemicals listed in the treaty, and exporting countries are obliged to make sure that producers within their jurisdiction comply. Date of Adoption was 10 Sep 1998 This came into force on 24 Feb 2004 India signed the convention on 24 May 2005 (accession) International Convention MARPOL is short for maritime pollution and 73/78 short for the for the Prevention of years 1973 and 1978) is one of the most important international Pollution from Ships, 1973 marine environmental conventions. It was developed by the as modified by the Protocol International Maritime Organization in an effort to minimize of 1978 relating thereto pollution of the oceans and seas, including dumping, oil, and air pollution. The objective of this convention is to preserve the marine environment in an attempt to completely eliminate pollution by oil and other harmful substances and to minimize accidental spillage of such substances. All ships flagged under countries that are signatories to MARPOL are subject to its requirements, regardless of where they sail and member nations are responsible for vessels registered on their national ship registry. Date of Adoption was 2 Nov 1973 This came into force on 2 Oct 1983 Ratified Annexes I - VI 3.2.12 Other Statutory Clearances Required The project needs to comply with the various existing statutory requirements and it is envisaged that certain permission/s and clearance/s will be obtained from the competent authority/authorities as part of sub-project preparation and/or execution. This will depend mainly on the area, type, size and scope of the sub-project. The broad requirements envisaged at this point of time are summarized below: Table 3:2 Key Statutory Clearances Required for Project Activities Sl. Clearance/ Relevant Act Competent Authority Responsibility No. Authorization 1 Tree Cutting Forest Conservation Act, State Forest Department or SPMU/PEA Permission 1980 Local Bodies / District Committee/Revenue Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 81 Sl. Clearance/ Relevant Act Competent Authority Responsibility No. Authorization Officials as the case may be (it is different in different states) 2 Plants such as Air (Prevention and State Pollution Control Concerned Crushers and/or Control of Pollution) Board Contractor Batching Plants Act, 1981 and Noise Pollution (Regulation and Control) Rules, 2000 3 Storage, handling Hazardous Waste State Pollution Control Concerned and transport of (Management and Board Contractor hazardous Handling) Rules, 1989 material/s and Manufacturing, Storage and Import of Hazardous Chemicals Rules, 1989 4 Location/ layout Environment Protection State Pollution Control Concerned of workers camp, Act, 1986 and Board Contractor equipment and Manufacturing, Storage storage yards and Import of Hazardous Chemicals Rules, 1989 5 Discharges from Water (Prevention and State Pollution Control Concerned Labour Camp Control of Pollution) Board Contractor Act, 1974 6 Permission for Environment Protection State Mines and Geology Concerned sand mining from Act, 1986; CRZ 2019 Department (Mining Plan), Contractor river bed Revenue Department / Local Bodies Environmental, health and safety issues during the construction stage generally involve equity, safety, and public health issues. The construction agencies require complying with laws of the land, which include inter alia, the following: • Payment of Wages Act, 1936: It lays down as to by what date the wages are to be paid when it will' be paid and what deductions can be made from the wages of the workers; • Equal Remuneration Act, 1979: The Act provides for payment of equal wages for work of equal nature to Male and Female workers and not for making discrimination against Female employees; • Child Labour (Prohibition and Regulation) Act, 1986: The Act prohibits employment of children below 14 years of age in certain occupations and processes and provides for regulation of employment of children in all other occupations and processes. Employment of child labour is prohibited in the Building and Construction Industry; Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 82 • Minimum Wages Act, 1948: The employer is supposed to pay not less than the Minimum Wages fixed by appropriate Government as per provisions of the Act; • The Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996 and the Cess Act of 1996: All the establishments who carry on any building or other construction work and employs 10 or more workers are covered under this Act; the employer of the establishment is required to provide safety measures at the building or construction work and other welfare measures, such as canteens, first-aid facilities, ambulance, housing accommodation for Workers near the workplace, etc.; • Workmen's Compensation Act 1923: The Act provides for compensation in case of injury by accident arising out of and during the course of employment; • Contract Labour (Regulation and Abolition) Act, 1970: The Act provides for certain welfare measures to be provided by the contractor to contract labourers • Inter-State Migrant Workmen’s (Regulation of Employment and Conditions of Service) Act, 1979: The inter-state migrant workers, in an establishment to which this Act becomes applicable, are required to be provided certain facilities such as housing, medical aid, travelling expenses from home to the establishment and back, etc.; • The Persons with Disabilities (Equal Opportunities, Protection of Rights and Full Participation) Act, 1995 and Rules, 1996 • Hazardous Wastes (Management and Handling) Rules, 1989: Occupiers generating hazardous wastes given in the list shall take all practical steps to ensure that such wastes are properly handled, i.e. collection, reception, treatment, storage, and disposed of without any adverse effects to human health and environment (Rule 4 Such occupier shall apply for authorization in prescribed format to the State Pollution Control Board). • These are indicative and there may be more clearances required based on area/project activities. Hence, for each project, the agency conducting Environmental Assessment or Project Executing agency shall ascertain the list of all clearances required as per National, State, Local rules/regulations and requisite permissions and clearances shall be taken prior to start of the projects. 3.2.13 Applicability of World Bank Operational Policies and Guidelines to ENCORE Since ENCORE Program is funded under the Investment Project Financing (IPF) instrument of the World Bank, its operational policies (OPs) and bank procedures (BPs) are applicable for the project. In addition to being an IPF, ENCORE also aims to use Development Linked Indicators (IPF + DLIs)72 and as under regular IPF, environmental and social requirements apply 72 IPF-DLI is a form of Investment Project Financing (IPF) and the IPF Policy, Directive and Procedure apply to it, as they do to regular investment lending. An IPF-DLI operation is subject to the Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 83 to all activities for which Bank support is sought by the Borrower73, whether they are financed by the Bank or from another source.74 In addition, Bank Standards also apply to ‘associated activities’ – defined as facilities or activities that are not funded as part of the project, but are ‘directly and significantly related’ to the project, carried out or planned to be carried out, contemporaneously with the project, and necessary for the project to be viable and would not have been constructed, expanded or conducted if the project did not exist.75 Likewise, the scope of the environmental assessment includes the ‘area of influence’ of Bank-financed activities, which may span an entire sector or region. In each case, the Bank policies are applied and compliance with them is verified at the same level. Project Concept Note Review for ENCORE Program was before 01 October 2018 and hence World Bank Safeguard policies are applicable to the project. World Bank’s Environmental and Social Framework (ESF) is applicable to all project financing prepared post the 1st of October 2018. The policies will be applicable to the Phase I of this Multi-Phase Program. During the preparation of Phase II of the program, the safeguards instruments will be reassessed in line with the ESF as and when they are prepared for approval by the World Bank’s Board of Directors. Description of Applicable WB Safeguard Policies to Phase I The World Bank has a set of OPs relating to environmental, social and legal aspects of projects. A policy is considered to have been triggered if the project activity relates to the content of any of the safeguard policies. Various actions and instruments to ensure that the requirements of those applicable policies will be satisfied in the further development of the project are guided through the ESMF. The Multiphase program of ENCORE is categorized as an Environmental Category A project based on the potential risks associated with project interventions. While the overall program is environmentally beneficial as the major investments aimed at improving coastal management through better planning, science informed interventions same procurement, financial management, environmental and social, and anti-corruption requirements that govern any regular investment operation. 73 as defined in the project’s legal agreement between the Borrower and the Bank 74 The environmental and social requirements applicable to IPF operations with Concept Decision or equivalent before October 1, 2018, are set out in OPs 4.00, 4.01, 4.03, 4.04, 4.09, 4.10, 4.11, 4.12, 4.36, 4.37, 7.50 and 7.60. Those applicable to IPF operations with Concept Decision, or equivalent, on or after October 1, 2018, are set out in the Environmental and Social Policy and Environmental and Social Standards, or OP/BP 4.03, as appropriate, and OP 7.50 and 7.60. It is possible that environmental or social consequences might follow from an action supported under a DLI without being triggered by any underlying expenditures – for example, a change in legislation to allow the privatization of state-owned mines or industries. IPF environmental and social requirements apply in this case as they do to eligible expenditures. 75 See ESS 1, paragraph 11. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 84 and most appropriate interventions; the construction activities environmental impacts that will need to be mitigated across the detailed design and implementation phases of the investments. The following environmental safeguard policies are applicable to the ENCORE Program. Table 3.3: World Bank Safeguard Policies applicable for the Project Sl WB Safeguard Policies Safeguard Policies Triggered by No ENCORE Yes No 1 Environmental Assessment (OP/BP 4.01) √ 2 Natural Habitats (OP/BP 4.04) √ 3 Pest Management (OP 4.09) √ 4 Physical Cultural Resources (OP/BP 4.11) √ 5 Involuntary Resettlement (OP/BP 4.12) √ 6 Indigenous Peoples (OP/BP 4.10) √ 7 Forests (OP/BP 4.36) √ 8 Safety of Dams (OP/BP 4.37) √ 9 Projects in Disputed Areas (OP/BP 7.60) √ 10 Projects on International Waterways (OP/BP 7.50) √ The World Band Group’s Environmental Health and Safety Guidelines The World Bank Group’s Environmental, Health, and Safety (EHS) Guidelines are technical reference documents with general and industry specific examples of Good International Industry Practice (GIIP). EHS Guidelines are applied as required by their respective policies and standards. These industry sector EHS guidelines are designed to be used together with the General EHS Guidelines document, which provides guidance to users on common EHS issues potentially applicable to all industry sectors. The EHS Guidelines contain the performance levels and measures that are generally considered to be achievable in new facilities by existing technology at reasonable costs. Application of the EHS Guidelines to existing facilities may involve the establishment of site-specific targets, with an appropriate timetable for achieving them. The applicability of the EHS Guidelines should be tailored to the hazards and risks established for each project on the basis of the results of an environmental and social assessment in which site-specific variables, such as host country context, the assimilative capacity of the region. Defined as the exercise of professional skill, diligence, prudence and foresight that would be reasonably expected from skilled and experienced professionals engaged in the same type of undertaking under the same or similar circumstances globally. The circumstances that skilled and experienced Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 85 professionals may find when evaluating the range of pollution prevention and control techniques available to a project may include but are not limited to, varying levels of environmental degradation and environmental assimilative capacity as well as varying levels of financial and technical feasibility. Applicability of specific technical recommendations should be based on the professional opinion of qualified and experienced persons. When host country regulations differ from the levels and measures presented in the EHS Guidelines, projects are expected to achieve whichever is more stringent. If less stringent levels or measures than those provided in these EHS Guidelines are appropriate, in view of specific project circumstances, a full and detailed justification for any proposed alternatives is needed as part of the site-specific environmental and social assessment. This justification should demonstrate that the choice for any alternate performance level is protective of human health and the environment. The World Bank Group General EHS Guidelines contain information on cross-cutting environmental and social, health, and safety issues potentially applicable to construction and can be downloaded via the following link. https://www.ifc.org/wps/wcm/connect/topics_ext_content/ifc_external_corporate_site /sustainability-at-ifc/policies-standards/ehs-guidelines Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 86 CHAPTER 4. ASSESSMENT OF PROBABLE IMPACTS DUE TO SUBPROJECTS 4.1 Subproject Typology Project activities considered for implementation in Seven (07) States / and Two (02) Union Territories (UTs) of coastal India relate to improving the coastal environment; leveraging the concepts of resource efficiency. Three coastal States, namely; Gujarat, Odisha and West Bengal have prepared ICZM Plans as part of the ICZMP Project supported by the World Bank. During MPA Phase I, ICZM Plans would be prepared for the selected coastal stretches in other States/UTs under the program. In addition to priority projects for coastal pollution prevention, livelihood support and coastal resilience identified in these ICZM Plans, those investments which will inform effective coastal management solutions to guide ICZM Plan preparation in these States/UTs will also be taken up for pilot/demonstration purposes during MPA Phase I. Institutional capacity building for effective coastal management, Mapping and Database creation, and Monitoring / Research and laboratory Facilities would be supported under Phase I. Investments proposed by the States/UTs include a) mangrove afforestation, and shelter bed plantation, b) habitat conservation activities such as restoration of seagrass meadows, sand dune stabilisation using soft/green cover, eco-restoration of sacred groves, development of hatcheries, rearing/rescue centers for turtles and other marine animals, etc, c) creation of infrastructure for tourism including interpretation and training centres, restoration and recharge of waterbodies, beach cleaning and development, use of renewable energy, other small infrastructure facilities (including shifting of power lines underground, improving post-harvest technology, fish landing/berthing facilities, works associated with restoration of rivers/streams). Livelihood improvement projects include demonstration of climate resilient or salinity resistant agriculture, water harvesting, and recharge/storage, creation of infrastructure and facilities to support ecotourism and fisheries, community-based; small-scale mariculture, seaweed cultivation, aquaponics, and value addition to other livelihood activities. Phase I will also support watershed management plans, biodiversity conservation plans, fisheries assessment, etc. 4.1.1 Impact Assessment Methodology The project design of ENCORE subsumes good environmental and social management. It is designed to promote the best environmental and social practices for the coastal space and has an inbuilt planning component; with a strong base on studies and research. Impacts due to a project/component or activities under a project can be positive (beneficial) and/or negative (adverse). Also, its repercussions or area of influence or spread may be local (limited in area/spread) or regional (wide area where the impact transcends or affects). Impacts may be limited or extensive in its magnitude (high/low Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 87 impacts) and duration (short/long time frame). It may also be significant or insignificant depending on the sensitivity of the parameters it affects (such as impact on endangered / not so adaptive species). The criteria for determining significance are generally specific for each environmental and social aspect but generally, the magnitude of each potential impact is defined along with the sensitivity of the receptor. Generic criteria for defining magnitude and sensitivity are summarized in the following subsections. 4.1.1.1 Magnitude and Duration of Impacts The assessment of magnitude shall be undertaken in two steps. Firstly, the key issues associated with the ENCORE are categorized as beneficial or adverse. Secondly, potential impacts shall be categorized as High, Average, Low or negligible based on consideration of the parameters such as: • Temporal extent (duration) and the likelihood of the potential impact; • Spatial extent of the potential impact; • Reversibility of the Impact; • Legal standards and established criteria. The magnitude of the potential impacts of ENCORE shall be identified according to the categories outlined in Table 4.1 below. Table 4:1 Aspects for Determining the Magnitude of Impacts Aspects High Average Low Negligible/Nil Duration of Long term (more than 20 Medium Term 1 to 2 years or Temporary with potential years) Lifespan of the Less than the no detectable impact Program (5 to 10 lifespan of the potential impact years) program Spatial extent Regional – much Beyond Within program Specific location of the beyond project immediate boundary within program potential boundaries Program component or impact components, site site boundaries boundaries or with no local detectable area potential impact Reversibility Potential impact Potential impact Baseline returns Baseline remains of potential (including positive requires a year Naturally or constant impacts impact) is effectively or so with some with limited permanent, requiring interventions to intervention considerable intervention return to within a few to return to baseline baseline months Legal Against Complies with Meets minimum Not applicable standards and national/approved limits given in national standard established national limits or Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 88 Aspects High Average Low Negligible/Nil professional standards and or standards but not international criteria international confirming to guidelines guidelines/obligations international lender guidelines in one or more parameters Likelihood of Commonly occurs under Usually seen Occurs under Unlikely to occur potential typical occurring under abnormal, impacts operating or construction most situations exceptional or occurring conditions (Certain) (Likely) emergency conditions (Occasional) 4.1.1.2 Sensitivity of Receptor The sensitivity of a receptor shall be determined based on a review of the population (including proximity/ numbers/ vulnerability) and the presence of features on the site or the surrounding area. Criteria for determining receptor sensitivity of the progr am’s potential impacts are outlined in Table 4.2 below. Table 4:2 Criteria for Determining Sensitivity Sensitivity Levels Description High Vulnerable receptor with little or no capacity to absorb proposed changes or minimal/limited opportunities for mitigation. Medium Vulnerable receptor with some capacity to absorb proposed changes or moderate opportunities for mitigation Low Vulnerable receptor with good capacity to absorb proposed changes or/and good opportunities for mitigation 4.1.1.3 Significance of the impact Significance of potential impacts are established using the impact significance matrix shown in Table 4.3 below. Table 4:3 Assessment of Significance of Negative and Positive Impacts Sensitivity / Vulnerability / Importance of Resource / Receptor Low Medium High of Negative Negligible Negligible Negligible Negligible Magnitude Impact Small Negligible Minor Moderate Medium Minor Moderate Major Large Moderate Major Major Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 89 Sensitivity / Vulnerability / Importance of Resource / Receptor Low Medium High Magnitude Negligible Negligible Negligible Negligible of Positive Impact Small Negligible Minor Moderate Medium Minor Moderate Major Large Moderate Major Major 4.1.1.4 Potential Key Environmental Impacts The Project investments are expected to enhance and support coastal resources, minimize coastal pollution and improve the livelihoods of coastal communities. It is envisaged that the project would lead to positive impacts, including marine and coastal conservation, pollution prevention and effective utilization of coastal resources, and promotion of sustainable coastal livelihoods. In addition, the project is expected to provide a scientific basis and an effective coastal management framework (including institutional capacity) for resource efficient and integrated coastal management. Rather than adhoc placing and implementation of project investments in time and space without adequate planning considerations, the ICZM Plan which would be prepared by each State as part of the project would set the stage for investments, with a scientific basis; considering the environmental, social and climate related sensitivities among others. Thus, the proposed project mandate subsumes safeguards management as an integral part of the project objectives and implementation. The assessment reveals no large scale, significant and/or irreversible impacts due to the proposed project interventions. The program will avoid undertaking any activities that will cause significant conversion or negative impacts on natural habitats and sensitive environmental receptors. Activities that may have cumulative/regional impacts or large scale construction / Operation and Maintenance (O&M) stage impacts (such as waste management, coastal protection structures) will be taken up for implementation only if its necessity is established and guided by ICZM Plans. The mechanism to predict the potential and mostly typical impacts on the key environmental and social parameters of sub-project areas is presented here. This is based on the baseline physical, environmental and social conditions, assessment of project components/sub- components and activities viz a viz the baseline and sensitivities. Though siting of subprojects is taken care of by comprehensive ICZM Planning which act as a prelude to subproject identification and implementation in the coastal zone, environmental impacts may be expected in case the subprojects are designed without adequate care. Environmental impacts on sensitive areas though meagre may include those due to change in landuse in or near environmentally sensitive coastal areas and Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 90 impacts on environmental quality due to construction and related activities. The project will cause general construction stage impacts which include (i) increase in noise, dust, impacts on air quality or safety risks due to poor construction methods and inadequate operation and maintenance (O&M) of facilities; (ii) temporary water quality impacts resulting from possible drainage and septage pollution from facilities created under the project or due to labor camps; (iii) impacts related to movement of vehicles including increased congestion, and conflicts with pedestrian movements; iv) hindered access/temporary changes in access to, and the use of, public spaces during construction/excavation works; and (v) public health risks due to improper waste/debris, sludge, excavated silt/muck management, or lack of attention to labor management. Similarly, with project investments expected to spread along India’s entire coast, including island territories, it is likely that some locations may have the presence of the indigenous population. Hence, there is a need for systematic safeguards management with a pre-defined framework for risk mitigation. The potential impacts of the program on the key environmental and social parameters are listed in Table 4.4. The significance of each impact based on the criteria defined above is also presented. In the subsequent sections, these impacts are discussed and a framework to manage these has been included. ESIA studies for each subproject should modify and further detail out this analysis as applicable, based on site/project studies, professional judgment and public consultations. A preliminary categorization of the project components/sub-components based on their environmental and social assessment requirements. A. Significant Environmental Impact Related to Project Siting Land Cover and Land Use Changes: Positive Impacts: Plans prepared under the project will determine the future landuse of the project areas. ICZM planning integrates coastal management in four directions: spatial; temporal; vertical; and, horizontal. Shoreline Management Plans and ICZM Plans prepared under the project based on science based planning and community involvement will have an overall positive impact on the environment, life and livelihoods through improved coastal resilience, and pollution prevention. ICZM impacts include coherent spatial planning, improved decision-making, better partner understanding, agreement on priorities, stronger community feeling, reduced traffic costs, better quality of life, reduction of pollution, more sustainable fisheries, more sustainable tourism, habitat restoration, reduced flooding and erosion, lower environmental risks, greater public awareness, and overall landscape / environmental improvement. Negative Impacts: Construction of different infrastructure facilities as part of demonstration projects may change existing land use and land cover at the local level Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 91 though project footprints are small. Further, this will have overall positive impacts on the coastal resources through improved resilience and livelihoods and pollution prevention. Impacts on Natural vegetation and trees/mangroves: Positive Impacts: Subproject siting will be based on scientific guidance and would hence avoid or minimize such vegetated areas. All subprojects would have environmental enhancement measures that would support improving the local vegetation using native species and would thus add value to. Project siting would incorporate measures for minimizing such tree cutting, and mangrove and shelter belt plantations, and compensatory afforestation. Negative Impacts: Siting of proposed infrastructures may require clearing of vegetation, cutting of trees and clearing/removal of natural vegetation. Impacts on coastal/marine habitats Positive Impacts: The subprojects involve conservation of marine habitats in various coastal locations, including hatcheries, planning to avoid areas of importance to such habitats for future infrastructure development, plantation of mangroves, and protection of reefs to support growth of varieties of marine fauna. Many of the subprojects focus on infrastructure creation to prevent pollution loads on marine fauna and would hence have significant positive impacts. Negative Impacts: Siting of proposed infrastructures, specially the construction of small jetties, sheds, fish markets, offices, landing sites, and livelihood activities may impact some habitats. Siting of mariculture areas or similar activities related to marine biodiversity may have indirect impacts on surrounding coastal and marine habitats in case of increased activities. Conservation and enhancement measures for the natural habitat shall be made part of the project. Large mariculture/aquaculture activities will not be supported by the project. Proper planning and siting of subprojects based on scientific principles and community consultations would ensure avoidance/minimization of such impacts. Siltation, drainage congestion, and water logging Positive impacts: The project aims to implement demonstration/pilot interventions to minimize drainage congestion and water logging. Project incorporates measures to avoid siltation and water logging; as siting would be based on ICZM Plans and other siting criteria. Negative Impacts: Some of the proposed construction activities may cause drainage congestion and water logging at the local area, if not properly planned/designed. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 92 It is important to note that major construction activities near to the coast or its sensitive resources would be planned only based on Integrated Coastal Zone Management Plans; which takes into consideration all sensitivities and science. Hence, these impacts could be assumed as minimal and well manageable. B. Environmental Impacts during Project Implementation Impacts on Air Positive Impacts: Large scale plantation, buffers and switching to low emission engines and technologies (e.g.: electric/solar instead of diesel fuel) suggested as part of the project would minimize air pollution impacts and will have an overall improvement in pollution scenario of respective areas. All project interventions will follow safeguards to minimize emissions and air pollution. Negative Impacts: Construction of small buildings / civil works for markets, fish landing sites, canal desilting and repairing of sluice gates may generate emissions from excavation equipment, other machinery, and construction traffic. The emissions may also include greenhouse gases (GHGs) from engine fuel combustion (exhaust emissions) and evaporation and leaks from vehicles (fugitive emissions) and other emissions. The emissions from construction activities will deteriorate the ambient air quality and affect the public health; more so in densely populated areas. In addition, dust generated from the above activities will also have impacts on crops and livestock. Impacts due to Noise Positive Impacts: Reduced noise levels due to switching to electric vehicles (including boats) for tourism would be beneficial to marine / coastal flora/fauna and sensitive receptors. Exclusion principles applicable to areas of natural habitats would protect such areas. Proper planning and management plans would minimize noise impacts on sensitive receptors including marine habitats. Negative Impacts: Noise will be produced by vehicular movement, excavation machinery, concrete mixing, and other construction activities. Sensitive receptors such as hospitals, schools, religious places, and crowded market areas are particularly vulnerable to increased noise levels. Impacts on Water Bodies Positive Impacts: The project interventions focus on the overall improvement of wetlands, coasts, water bodies. They aim at reducing the pollution load on water bodies; thereby preventing negative impacts on coastal/marine species and water quality and improving biodiversity. The project areas would benefit from the overall improvement in water quantity as well. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 93 Negative impacts: Implementation phase of infrastructure or activities closer to water bodies, can potentially cause some localized increase in water turbidity. However, this increase in turbidity being localized and temporary is not likely to cause any significant impact on overall water quality and the aquatic fauna. The construction camps and other site facilities such as offices and warehouses will also generate considerable quantities of waste effluents. Other possible causes of land or water contamination include accidental leakage or spillage of fuels, oils, and other chemicals, and waste effluents released from construction sites. These effluents can potentially contaminate the drinking water sources of the area and can also be harmful for the natural vegetation, cultivation fields, water bodies, and aquatic flora and fauna. Impacts on Soil Positive Impacts: Projects including watershed management, plantations positively influence soil quality and prevents sedimentation. Improved agriculture by following Integrated Pest and Nutrient Management supports overall improvement in soil quality, as opposed to current practices. Negative Impacts: Soils (including top soil) in the construction area and agricultural/grazing land will be prone to pollution from the construction sites, workers' camps, and other material storage areas. Fuel and hazardous material storage for certain construction/operation activities and their handling are also the potential sources for soil and water pollution. Improper siting, storage, and handling of fuels, lubricants, chemicals, and hazardous materials, and potential spills may result in hazards and severely impact the soil and water quality. Generation of Solid Waste and Hazardous Waste Positive impacts: By preventing the pollution loads on to coastal areas, the subproject activities reduce soil pollution/contamination. This improves overall environmental quality, health of the community and biota, and supports soil biodiversity. Negative Impacts: Waste generated during the construction phase includes Construction and Demolition (C&D) Wastes, excess construction material such as sand and soil, faulty/damaged parts, metal scraps, cardboard boxes and containers, and cotton swaths from workshops, and domestic solid waste from construction offices and camps. In addition to the above, small quantities of hazardous waste may also be generated mainly from the vehicle and facility maintenance activities (liquid fuels; lubricants, hydraulic oils; chemicals, such as anti-freeze; contaminated soil; materials used to absorb oil and chemical spillages for spill control; machine/engine filter cartridges; oily rags, spent oils and filters, contaminated soil, sharps as in broken tools and others). It is imperative that such waste is responsibly disposed to avoid adverse environmental and social, human health and aesthetic impacts. Inappropriate disposal Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 94 of these wastes can lead to soil and water contamination as well as health hazards for the local communities, livestock, and aquatic and terrestrial fauna/flora. Impacts on Coastal / Marine habitat Positive Impacts: Project activities including deepening of ponds, desilting of canals, repairing of sluice gates improves water retention and ground water recharge. Improved small scale mariculture activities performed with adequate safeguards support livelihoods of coastal fishermen who face the vagaries of climate. Negative impacts: Deepening of ponds, desilting of canals, repairing of sluice gates and construction of large mariculture farms may potentially disturb the aquatic habitat by increasing the water turbidity. Some sensitive and important habitats exist in the coastal areas and rivers/wetlands/estuaries. However, any accidental leakage, spillage of contaminants, or dumping of solid waste/ debris on land or in water bodies can potentially affect these habitats. During construction or operation of large mariculture facilities/ocean based facilities, there is a potential risk of conflicts with fish and other aquatic species. This can cause injuries and even fatalities to these species. Hence, large scale mariculture activities are excluded under the program. Site Clearance and Restoration Positive Impacts: Proper work close out after construction activities following adequate safeguards improves environmental conditions and safety. Negative Impacts: After the completion of the construction activities, the left-over construction material, debris, spoils, scraps and other wastes from workshops, and camp sites can potentially create hindrance and encumbrance for the local communities in addition to blocking natural drainage and or irrigation channels. Occupational Health and Safety Positive Impacts: Workers / Communities trained on effective OHS helps change the work culture and improves work safety in all project States. This would be a value addition for future projects/activities in the region. Negative Impacts: Construction activities will involve small to medium scale excavation, operation of construction machinery (sometimes large and mechanized) and vehicular traffic. These activities may pose health and safety hazards to the workers at site especially due to hazardous substances, lifting and handling of heavy equipment, operating machinery and electrical equipment, working near water/slush (common in coastal marshy areas/areas near wetlands) or at height and more. The program will need fuels, oils, and asphalt during the construction phase. Inappropriate handling or Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 95 accidental spillage/leakage of these substances can potentially lead to safety and health hazards for the construction workers as well as the local community. Occupational health and safety hazards related to demolition and decommissioning of existing structures as well as construction activities include the following: exposure to asbestos, dusts including silica and lead, chemicals, sunlight, diesel engine exhaust emissions, fire, frequent exposure to loud noise and heat, use of vibrating tools, frequent or excessive manual handling of loads, stress and fatigue. Potential accident hazards for workers include accidents due to worker - vehicular conflicts in the construction site including uncontrolled movement of vehicles, heavy moving parts of large mechanized equipment and vehicles; falls (from heights); trench collapse; scaffold collapse; sinking in slushy earth, accidents due to sharp tools and electric tools strewn around on site, unmanaged construction material and wastes on site as a result of poor housekeeping, electric shock and arc flash/arc blast; failure to use proper personal protective equipment; and repetitive motion injuries. Impacts due Labor influx on the Environment Positive Impacts: Work opportunities for local work force and community contracting improves the local economy and its forward and backward linkages. Properly managed labor camps, following adequate safeguards, would improve labor stay and working conditions and would provide positive guidance to the contractors who could carry these forward to other projects and positively influence the labor management practices in all States. Negative Impacts: Due to the absence of a local workforce and higher wages, the contractors mostly resort to migrant laborers in many parts of the country. Hence, it becomes necessary often for the contractors to provide camps/labor accommodation in insitu labor camps or rented premises near construction sites. Often, such camps are in the form of minimal living areas with less ventilation, light, amenities, health care or emergency facilities made of cheap materials with less climate adaptability or resilience. Without adequate facilities for healthy living, such camps end up as breeding grounds of pests and disease vectors. Population pressure due to labor influx may lead to expanded use of natural resources, such as forests and aquatic resources. Influx may induce increased localized deforestation/disturbance to mangroves/shelterbelts for collection of fuel wood, or forest conversion as newcomers seek land for housing or agriculture. There may also be impacts on biodiversity and wildlife from increased hunting and foraging or the siting of work camps in sensitive areas. Changing land use patterns may result in increased demand for water resources or the introduction of invasive species. Changes in land and resource use may, in turn, affect local food systems and nutritional outcomes. Worker camps, without appropriate wastewater Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 96 discharge, may pollute nearby water sources. Potable water needs of worker camps can result in increased pressure on freshwater resources in the project or camp area. Impacts due to extraction of construction materials Positive Impacts: Best management and extraction practices for construction materials would improve contractors/proponents who know how on sustainable resource extraction/use. This would have a positive influence on overall sustainable work practices in the region. Negative Impacts: Impacts due to borrow areas and other material sourcing related impacts are important for the overall, sustainable resource use and geo-stability. The World Bank Group ESH Guidelines for Construction Materials Extraction is also applicable to the project and used as key guidance provided to contractors on the management of environmental health and safety during construction material extraction. These guidelines include information relevant to construction materials extraction activities such as aggregates, limestone, slates, sand, gravel, clay, gypsum, feldspar, silica sands, and quartzite, as well as to the extraction of dimension stone. It addresses stand-alone projects and extraction activities supporting construction, civil works, and cement projects. Although the construction materials extraction guidelines emphasize major and complex extraction schemes, the concepts are also applicable to small operations and should be used for guidance. These guidelines can also be downloaded via the link here: https://www.ifc.org/wps/wcm/connect/topics_ext_content/ifc_external_corporate_site /sustainability-at-ifc/policies-standards/ehs-guidelines C. Environmental Impacts during Post Project Period / O&M Period Potential Changes in Water Courses Positive Impacts: The potential desilting activities on water courses may include stabilization and deepening resulting in localized bed changes. These changes are mostly positive in nature, likely to take place over a long period of time and need to be regularly monitored. Negative Impacts: Adequate safeguards if not followed during O&M stages will result in OHS issues and Community safety. However, the PEAs /communities/contractors would be adequately trained in the process and could be expected to carry out maintenance activities with sufficient care. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 97 Loss of Ecological Connectivity Positive Impacts: ICZM Plans would consider these sensitivities, with proper consultations to derive the best local knowledge and opinions and propose the best siting frameworks. Negative Impacts: Construction of some infrastructure may disconnect local wetland/habitat connectivity that would have a potential negative impact on fish and other aquatic species. A detailed baseline survey and careful designs are needed for such activities. Impact on coastal/marine habitats Positive Impacts: Impacts on mangroves on improving costal and marine biodiversity is well established. This would also support coastal resilience in a standalone manner; or in combination with other coastal defense measures. Promoting small scale mariculture with adequate safeguards will support the adaptive capacity of the local populace during seasons when they cannot practice their normal livelihood activities. Habitat restoration activities will ensure long term sustenance of coastal/marine biodiversity and its many positive influences on resource base, coastal defense, livelihoods, and socio-economic linkages. Negative Impacts: Activities like improvement of coastal defense (where feasible) by mangrove rehabilitation, cultivation of sea grass/livelihood activities based on other species and promoting large scale mariculture in potential coastal areas may alter surrounding marine habitats. However, these will have positive impacts once they are sustained in the area. However, large scale mariculture activities may cause water pollution and alter the beach ecosystem due to the artificial infrastructure. It may cause loss of staging and feeding ground of coastal avifauna. Impacts on Vegetation Positive Impacts: Mangrove and shelter belt plantations improve the tree cover and carbon sequestration effects, with overall positive impacts. All projects will be undertaken with adequate measures to avoid or minimize loss of vegetation. Negative Impacts: Infrastructures those will be constructed under the proposed project would be the sites of human access, which may lead to loss or disturbance to nearby vegetation (herbs, shrubs and trees due to human footprint (including increased footfall, light, air, water noise pollution, latent heat increase / heat island effect due to various activities, competition for resources etc.) during post project stage. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 98 Generation of Solid Waste Positive Impacts: some of the subproject activities aim at improving solid waste, liquid waste, marine litter, and plastic waste management in multiple locations in project states. These would have overall positive impacts on all environmental components. Negative impacts: Routine maintenance of facilities created may result in construction/demolition wastes. Solid waste will be generated from markets, landing sites, packaging units and also during regular operation and maintenance activities of the facilities. There may be small quantities of packaging wastes, hazardous / e-wastes wastes from batteries, generators, office/ communication facilities. This waste including plastics and hazardous wastes if not appropriately disposed of has the potential to contaminate soil and water resources, thus negatively affecting communities as well as natural habitats and contributing to more marine litter. Beach cleaning activities would lead to the collection of solid wastes including plastics, which if not properly treated and disposed of; creates impacts on biotic and abiotic components. Air Pollution Positive Impacts: During the post project phase, material transport for construction and movement of construction vehicles to these sites will be lesser. Improvement in the fuel used in boats (eg. solar) would reduce emissions due to the use of diesel. Negative Impacts: Emissions from local road traffic along the markets, landing sites, and other infrastructures may affect ambient air quality. Road traffic will be increase due to the construction of these infrastructures in the project area. Noise Generation Positive Impacts: Traffic noises will be lesser during the post project period when compared to the construction period. Provision of adequate buffers, vegetation would further reduce noise impacts. Negative Impacts: During operation, noise levels along the access roads, markets, tourism facilities/interpretation centers/parks, landing sites, will be high due to the higher traffic volumes and more human footfall. Traffic noise will be a significant nuisance to sensitive receptors such as ecologically sensitive areas, hospitals, schools, and religious places and also to the children and aged persons. Impacts on Water – Run-off / Quantity/Quality Positive Impacts: Following proper siting and pavement mechanisms/materials which would support water percolation would, in fact, support water recharge and effective channelization during the operations phase. Various erosion protection measures and Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 99 watershed management proposed under the program would support agriculture lands and soils from erosion. Improve recharge would improve water quantity/quality available for the local communities. During the post construction phase, water availability for irrigation/agriculture use and consumption will also improve, thus supporting coastal communities immensely in their overall health and economic activities. Negative Impacts: Increased footprint due to infrastructure/facility construction increases the amount of impermeable surface area, which increases the rate of surface water runoff. Increased storm water flow rates can lead to stream erosion and flooding downstream; cause soil erosion, channel modification and siltation of streams and wetlands. During the operation phase, some localized increases in turbidity may take place during any maintenance works of the constructed sites. Similarly, maintenance works can also generate a limited quantity of waste effluents. Changes in Land Use Pattern Positive Impacts: ICZM Plans suggest the best landuses considering resilience, livelihood, and coastal/marine resource; following community consultations and science based planning. Hence, operational stage landuse impacts are not expected to be negative. Tourism and other livelihood activities would not have a large footprint or impact on coastal/marine resources. This would also improve adaptation strategies of local communities with small-scale infrastructure. Careful planning also avoids landscape fragmentation and thus supports biodiversity. Negative Impacts: Markets, tourism infrastructure, landing sites, access roads, mangrove plantation, oyster/ sea grass beds (at suitable sites) may change local land use pattern upon getting popularity during the operation period, which will replace existing use such as agriculture and vegetation in terrestrial area and natural aquatic system/ beach ecosystem in the marine area. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 100 Table 4.4: Summary of Potential Environmental Impacts and their Significance Potential Impacts Duration Spatial Reversible Likelihood Magnitude Sensitivity Significance Significance Significance of of Extent or not of Positive Prior to Negative Impact Impacts Mitigation Impacts after of Negative Considerations impacts in the Long- Term Plan/ Mitigation A. Significant Environmental Impact Related to Project Siting/Initiation 76 Land cover and land use changes Long Local No Certain Low Medium Minor Moderate Minor negative term Positive negative Impact on natural vegetation and Long Local Yes Certain Medium Low Minor Moderate Minor negative trees/mangroves term Positive negative Impacts on coastal/marine habitats Long Local No Likely Medium Medium Minor Moderate Minor negative term Positive negative Siltation, Drainage congestion, and Long Local Yes Likely Medium Low Minor Moderate Minor negative water logging term but Positive negative beyond project foot print B. Environmental Impacts during Project Implementation 77 Impacts on Air Short Local Yes Certain Medium Low Negligible Moderate Minor negative term Positive negative Noise Short Local Yes Likely Medium Low Negligible Moderate Negligible term Positive negative negative 76 Positive impacts due to collaborative planning exercise, increased awareness and considerations on coastal aspects 77 Positive Impacts are minor or negligible considering construction activities Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 101 Potential Impacts Duration Spatial Reversible Likelihood Magnitude Sensitivity Significance Significance Significance of of Extent or not of Positive Prior to Negative Impact Impacts Mitigation Impacts after of Negative Considerations impacts in the Long- Term Plan/ Mitigation Water Bodies/Changes in Water Long Local No Certain Medium Medium Minor Moderate Minor to Courses term but Positive negative moderate beyond negative project foot print Impacts on Soil (Sediments, Top Short Local Yes Certain Medium Low Negligible Moderate Minor negative Soil) term Positive negative Solid wastes and hazardous wastes Short Local Yes Certain Medium Low Minor Moderate Minor negative term Positive negative Impacts on aquatic habitat Long Local No Certain Medium Medium Minor Moderate Minor negative (coastal/char land) term but Positive negative beyond project foot print Site clearance and restoration Short Local Yes Certain Medium Low Negligible Moderate Minor negative term Positive negative Occupational health and safety Short Local Yes Certain Medium Medium Major Moderate Minor to including Labour Management term Positive negative Moderate negative C. Environmental Impacts during Post Project Period / O&M Period Changes in water courses Long Local No Likely Small Medium Major Low Negligible term Positive negative negative Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 102 Potential Impacts Duration Spatial Reversible Likelihood Magnitude Sensitivity Significance Significance Significance of of Extent or not of Positive Prior to Negative Impact Impacts Mitigation Impacts after of Negative Considerations impacts in the Long- Term Plan/ Mitigation Ecological connectivity Long Local No Certain Medium Medium Major Moderate Negligible term Positive negative negative Impact on Coastal / marine habitat Long Local Yes Likely Medium Medium Major Medium Negligible term Positive negative negative Impacts on vegetation Long Local Yes Likely Medium Medium Major Moderate Negligible term Positive negative negative Solid/other waste Long Local Yes Certain Medium Medium Major Moderate Negligible term Positive negative negative Air pollution Long Local Yes Likely Medium Low Medium Moderate Minor negative term Positive negative Noise generation Long Local Yes Likely Small Low Medium Moderate Minor negative term Positive negative Water Run-off, Quantity/ Quality Long Local No Certain Medium Medium High Positive Moderate Minor to term negative moderate negative Changes in land use pattern Long Local No Certain Medium Medium High Positive Moderate Negligible term negative negative Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 103 4.1.1.5 Potential Key Social Impacts The activities under the project are unlikely to involve private land acquisition. However, there could be temporary relocation of residences/business establishments for construction or restoration works. In the case of such exigencies, the management framework will be applied and implemented. Possible impacts of the project can be categorized in three broad groups, i.e., (1) loss of immovable assets i.e. agricultural land, homestead land, cattle sheds, trees, community infrastructure, etc.; (2) loss of livelihood or income opportunity on account of loss of business establishments; and agricultural land; and (3) impact on the community in terms of loss of common property resources or access to such resources, such as grazing land, other land used by commons etc. The impacts can be either temporary (for the duration of construction activities) or permanent. Though it is envisaged that subprojects will involve very generic social issues that are manageable, there might be some subproject activities proposed in due course, that may carry a higher social risk and/ or disruptions and/or impacts. The possibility of such issues arising in the subproject sites will be identified during the subproject screening process. The broad categories of social project interventions considered under this project are such as diversification of livelihood; trainings and community owned interventions for coastal and marine resource management. Since there are construction activities involved such as coastal protection structure for erosion or developing infrastructure such as solid waste management or sewage as well as livelihood activities, there will be considerable involvement of the concerned communities and impact on them. Following are the major anticipated impacts of the projects as per the phases: Construction/Rehabilitation/Restoration Phase Loss of private land: Most of the project activities require little or no land. However, some construction/plantation/restoration and other interventions might have minimal land requirements for which only public land has been considered. In spite of the strict consideration that the project will not acquire any private land parcel, legislative procedure and support for compensation and resettlement have been explained in this RPF. In case of any loss of private land due to project intervention, Resettlement Action Plan will be prepared in line with agreed RPF. Relocation of structures: Structures, such as street vendor stalls, may need to be moved or relocated for implementation of projects such as restoration of built heritage or natural coastal resources (such as mangrove)/infrastructure (solid waste management and sewage)/eco- tourism activities/ beach cleaning/ livelihood activities/ protection of coastal structures or any other activities. Resettlement Action Plan will be prepared in line with agreed RPF in case of any adverse impact on the structures whether residential or commercial. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 104 Removal/displacement: Displacement of vendor stalls/small businesses/ small informal establishments such as fisherman hut/informal fish- landing sites/ may have adverse impacts with regards to the security of the concerned people. This can especially impact women vendors/ small business owners/traditional small fishermen or traditional farmers. Resettlement Action Plan will be prepared in line with agreed RPF in case of any relocation of both titleholders as well as non-titleholders. Loss of and/or access to public land or common property: Fences may need to be erected to protect coastal resources (sand-dunes, turtle nesting sites and others), or temporarily be erected for construction works (coastal protection structures), and they could block access to people’s lands or public spaces like a part of a beach. Vendor stalls may need to be moved to be outside or inside the fence (which could reduce the customer base of the vendor). To the extent, possible access to common property will not be disturbed. In case of loss of access, the project will provide alternative access in consultation with the community to ensure no adverse impact on the business of the local community. Inconvenience during construction: There could be temporary impacts during construction activities including dust, noise and increased vehicle traffic, and lighting during night-time hours. The community will be informed beforehand of any intervention that may take place and the timeframe for its completion. Loss of livelihood or sources of livelihood: There may be negative economic impacts on small businesses/traditional and small scale fishermen/ farmers/ individuals informally working in the structure/site/area to be rehabilitated. Vendors or small businesses removed or displaced from their original locations may be unable to return to these once they have been rehabilitated, thus facing significant loss of income. Resettlement Action Plan will have measures to restore livelihoods. Impact on host community due to labour influx: Since there are construction activities involved, there may be issues related to the use of local resources by migrant labour or interference with the local community leading to conflict with the community. Other issues could be securing labour rights related to minimum wage rate, safety at construction sites and provision of basic facilities to labours and their families during construction. Labour Management Plan will be prepared for each sub project involving migrant labours and will be monitored during the implementation stage. Conflict with the Community: During the implementation phase, there might be a conflict with the local community despite having the consultation meetings. These can happen due to the apprehension of inconvenience, the influx of workers or fear of loss or inaccessibility to the common resources such as beach or mangrove. Community consultation will be an ongoing activity to avoid any kind of conflict with the community. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 105 Operation and Maintenance Phase Unequal benefits from the subprojects to the detriment of women, youth and other vulnerable and cultural groups, potentially resulting in intra-community conflict and conflict between construction workers and the community Increase in violence and harassment in public areas which can negatively impact the economic activity of women, youth and other vulnerable and cultural groups. Health issues if solid waste from construction is not properly disposed of; emissions from construction equipment; noise and dust during construction. Inconvenience to the community if traffic flow is not managed during implementation Additional impact on community infrastructure due to the influx of labour force. Due restoration and resettlement there can be denial of access to all types of natural and cultural property formerly used by the community. After the construction of permanent structures, there can be damage to the aesthetics of scenic landscapes. Change in the dynamics of community-resources relationship. With the interventions related to coastal resources management including conservation of endangered species and livelihood activities, the tradition communities might have some adjustment problems with the new approach. Though the outcome will only result in securing their livelihood in a sustainable way and protect the coastal resources from degradation. Continuous consultation with the community will be an integral part of the operation to ensure that the community is part of the decision-making process. This will help in avoiding any kind of conflict during the maintenance or operations phase. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 106 CHAPTER 5. ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK The Environmental and Social Management Framework (ESMF) will help identify and address the potential environmental and social concerns or impacts of a project throughout the project cycle. The objective of ESMF is to help the project in taking informed decisions and mainstream environmental and social concerns in the project design. Objective of the Environmental and Social Management Framework (ESMF) is to: ▪ Support the integration of environmental and social aspects into the decision-making process at all stages related to planning and design by identifying, avoiding and/or minimizing adverse social impacts early-on in the project cycle. ▪ Enhance the positive/sustainable social outcomes through improved/appropriate planning, design, and implementation. ▪ Build the capacity of PEA and SPMU to take-up and coordinate responsibilities related to the application and implementation of the ESMF with the NPMU, including preparation of Environmental and Social Assessment and Management Plans. ▪ Provide guidelines and procedures for further consultations during project implementation. ▪ Provide systematic guidance to address potential risks and to enhance quality, targeting, and benefits to the neighbouring communities. ▪ Ensure that stakeholders, irrespective of whether they benefit from or are adversely affected by the project interventions, are well informed and are able to participate in the decision-making process. ▪ Support compliance with applicable legal/regulatory requirements of GoI and State governments; as well as with the requirements set forth in the relevant Bank policies. ▪ Minimize adverse impacts on the environment, community, cultural property, and other common property resources. ESMF is a tool for ENCORE Program to screen the subprojects to decide on including/excluding them; to categorise based on defined criteria and to decide on how to manage these using either full-fledged ESIAs and ESMPs or using Generic ESMP. ESMF describes the process, institutional mechanism, and budget to undertake screening, scoping, assessing and incorporation of mitigation measures during the project cycle involving a) Sub- project Initiation, b) Sub-project Preparation, c) Sub-Project Implementation, d) Monitoring and Evaluation. This also includes guidance on (i) Resettlement Policy Framework; (ii) Indigenous Peoples Planning Framework (IPPF); (iii) Gender Action Plan (GAP); labour Management Framework and (iv) Consultation framework. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 107 5.1 ESMF Adoption Framework The ESMF adoption framework is presented in the following Figure 5.1; which is discussed in detail in the following sub-sections. • Screening and Initial Environmental & Social Examination • SubProject Tracking, Filling the Screening format, Identification of Risk /Impacts SubProject • Categirisation of the subproject as per extent/severity of environmental (E1, E2, E3...) identification/ and social (S1, S2, S3...) impacts Initiation • Impact Assessment • Low Risk: Develop and implement Generic mitigation / monitoring measures, Apply environmental conditions in contract documents • Moderate Risk: Develop specific mitigation / monitoring measures for the project, Apply environmental conditions in contract documents SubProject • High Risk: Carry out detailed EA, Develop project specific mitigation / monitoring Preparation measures, Apply environmental conditions in contract documents • Environmental and Social Review and Approval • EA and mitigation measures prepared by PEA; reviewed and approved byCommittee, Environmental and Social Specialists, (also incorporating comments/approval of the World Bank), incorporate suggestions, approval and disclosure requirements • Applicable approvals / permits /clearances from various agencies for the project SubProject • Apply environmental conditions / ESMP in contract documents, allot budget Appraisal & • Approval for the SubProject Approval • Implementation of Environmental and Social Mitigation Measures • Arrange tools/facilities to Implement mitigation measures, Monitor, Report and Correct SubProject • Training, Capacity Building, Cross-learning for Staff, Project management support Implementati agencies, Communities in implementing mitigation measures on • Environmental and Social Monitoring • Periodic Monitoring at various levels: PEA/PMC, SPMUs, NPMUs, WB - compliance to mitigation measures, regulatory aspects, pollution abatement • Database on ESIAs for Projects and ESMP implementation SubProject • Carry out annual Third Partty environmental and social audits for subprojects Monitoring Figure 5:1 Environmental and Social Management Framework for ENCORE Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 108 5.2 Sub-project Identification and Initiation 5.2.1 Project Environmental and Social Screening Stage 1: Exclusions to be considered during the Sub-Project Identification Stage ENCORE will not support sub-projects which will involve the following: Table 5:1: List of Non-permissible Activities under ENCORE Sl.No. Non-Permissible Activities under ENCORE A. Any activity that converts or leads to conversion and/or degradation of significant areas of critical natural habitats (areas officially protected) and/or Sites of Conservation Importance and designated forest areas; including extraction of raw materials from such areas B. Purchase or use of pesticides (or any activity involving pesticides that are banned by the Government of India and World Health Organisation), insecticides, herbicides, and other dangerous chemicals; asbestos (e.g., Asbestos Cement pipes for irrigation, Asbestos Cement sheets for roof) and other investments detrimental to the environment C. Any activity that violates the provisions of applicable National 78 including Coastal Regulation Zone Notification, 2019 of MoEFCC and EP Act and State / Local body laws D. Construction of any new large water storage structures - such as weirs, barrages, and dams or any activity directly or indirectly related to the safety of dams, new large irrigation canals, new branch canals and new offtake structures E. The introduction of any new exotic marine species (note: this provision does not apply to any native and/or naturalized species, or any micro-algae that is imported as live feed) F. Construction of permanent buildings within the wetlands or walls in or around wetlands which will interrupt water flow, tidying of wetlands or mangroves by the removal of dead wood that serves as habitat for multiple fish species Filling of wetlands within protected areas and outside, in strategic landscapes. G. Establishing aquaculture/mariculture activities in close proximity to designated protected marine/terrestrial habitats, or projects involving large scale mariculture/aquaculture activities. H. The use of artificial Reefs, soft and hard structures may contribute to stabilizing the coast, but they can also generate significant unintended downstream impacts. Hence, they should be considered only if a strong scientific basis is established following the preparation of Shoreline Management Plans (SMPs) I. Involuntary land taking leading to loss of shelter, livelihood or sources of livelihood J. Any waste management project (solid or liquid) which do not consider it in an integrated manner – without proper plan from source till disposal and / or for large cities/towns Such projects will be excluded during the Project Identification stage itself. PEA/ Line Department shall scrutinise the project for any of the above activities/components and 78 In case of archaeological sites/monuments, the prohibited area is 100 m and the regulated area is 200 m as per AMASR Act, GoI Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 109 avoid taking up such subprojects for implementation. PEA should maintain a record of such subprojects excluded from ENCORE following this Stage 1: Exclusions List. Stage 2: Initial Environmental and Social Examination (IESE) The main objective of initial environmental and social examination of sub-projects will be to (a) determine the anticipated environmental/social impacts, risks and opportunities of the sub-project (ii) determine if the anticipated impacts and public concern warrant further environmental/ social analysis and if so to recommend the appropriate type and extent of assessments needed. The purpose of screening is to get an overview of the nature, scale, and magnitude of the issues in order to determine the scope of the detailed ESIA that would be subsequently carried out. When a subproject is proposed for initiation, PEA through its environment (and biodiversity depending on the type of project) and social (and gender) specialists would undertake the environmental and social screening using the Screening Format (separate formats for Environmental and Social Aspects) provided in Volume II. Key risks and impacts would be identified at this stage, through analysis of on-field data and consultations/discussions with stakeholders. Screening format shall be duly filled and signed and submitted to SPMU / NPMU (as the case may be – for State Level Components or National Level components) for concurrence. After identifying issues, the applicability of the Bank’s environment and social safeguard policies is established along with GoI’s regulatory requirements. Based on this, boundaries and focus areas for the ESIA along with the use of specific instruments and additional institutional support required for the sub-project planning, implementation and supervision are determined. The key steps involved in the process are briefly outlined below. Step 1: Ascertain presence of any environmentally sensitive areas as detailed in the screening criteria section and with respect to CRZ notification during site identification. Step 2: Confirm the applicability of regulations and whether any of the sub-projects are prohibited as per the existing law/regulations in the proposed sites. Wherein the proposed activity is restricted and change has been made in project design to avoid such prohibitions, Step 1 needs to be performed again. Step 3: Conduct reconnaissance site visits for ground truthing to incorporate additional information. Step 4: Revisit the screening check list and ascertain outcomes of the screening checklist. Undertake the detailed screening process for all investments in consultation with the line department/s. Step 5: Determine the requirement of an ESIA study, its scope, and other applicable rules /regulations and clearances. This will determine the Project Categorisation. It is necessary that the PEAs and Line Departments have detailed topographic maps of all the proposed subproject sites with coastal regulation zones identified along with Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 110 details of ecologically sensitive areas, habitat areas, Reserve Forest, Wildlife Sanctuary at a suitable scale to undertake the screening tasks. Clarifications if any shall be sought from respective SCZMA, NCZMA and NCSCM. For this; it is important to have a special cell constituted in NCSCM to advice PEA/NPMU, SPMUs and NCZMA/SCZMAs on the applicability of CRZ notification to various sites, activities, and subprojects. The cell shall also guide PEAs on the procedures to be followed and timelines. This will establish NCSCMs function in this sphere; also mandated by CRZ 2019. It is advisable for the PEA (and/or SPMU) to organise a meeting with all the Line Departments and the concerned officials of the State Environment & Forest Department, SCZMA and agencies like the Pollution Control Board before starting the process to gain a better understanding of the clearance process. The outcome of this screening process will help prioritize the various investments and where required, start the clearance process in a timely manner e.g. project sites (in particular requiring Forest / CRZ / other clearances). Projects for which the clearance process may be longer can be sequenced/phased later in the overall project implementation plan. However, the clearance processes for such projects/sites shall be initiated at the earliest. This shall help ensure that no subprojects are impacted due to delays in the clearance procedures. PEA shall submit duly checked and signed forms to Safeguards Specialists at SPMU. Based on the initial environmental and social examination undertaken, details provided by PEA and discussions with various agencies concerned, Environmental and Social Specialists of the SPMU would undertake project categorisation. 5.2.2 Categorisation of the Projects Depending on the type of investments and nature of activities, proposed subprojects will have varying impacts on the environment. Hence, the type and extent of environmental and social assessment to be carried out to identify and mitigate the impacts also largely depends upon the complexities of project activities and exact locations. It is important to identify the probable impacts and plan for mitigation measures early on, to manage them effectively. In order to facilitate effective screening, under ENCORE Program, the subprojects are grouped into different categories – E1, E2 and E3 linked to extent and severity of impacts (depending on type of activities and locational characteristics) and regulatory requirements. So, based on the screening process undertaken, Environmental and Social Specialists of the SPMU would undertake project categorisation. They would classify subproject into E1, E2, E3 as per severity and extent of environmental impacts and S1, S2 and S3 based on social impacts. The E1, E2 and E3 categories are defined as follows: Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 111 a. Subprojects which may have major environmental impacts; thus, necessitating Environmental Impact Assessment (ESIA) are categorised as E1. The proposed subproject is classified as E1 if it is likely to affect Sensitive Environmental Components (SEC) such as those mentioned in Table 5.2 below. The projects which will involve major activities/components in CRZ I and IV (such as ESAs, CVCAs, Intertidal areas, area between LTL and 12nm) also qualifies the locational criteria to be categorised as E1. Those projects/activities, which require CRZ and/or environmental clearance as per the CRZ 2019 notification and EIA notification published by the MOEFCC will also be categorized as E1. Any subproject involving any activity related to a critical natural habitat as per WB Policy OP 4.04 will also be categorised as E1. Such subprojects would require detailed site and activity specific Environmental Assessment, project impact identification and specific mitigation measures to take care of anticipated negative impacts in addition to improving environmental performance, ensure environmental sustainability and climate resilience/adaptation. Table 5:2 Sensitive Environmental Components Sl.No Sensitive Environmental Components 1 ESAs, CVCAs, other sensitive coastal areas rich in corals, mangroves, breeding grounds of specific species 2 Gulf areas, creeks, canals 3 Estuaries rich in mangroves, breeding ground of specific species 4 Religious, heritage historic sites and cultural properties 5 Archaeological monuments/sites 6 Scenic areas, Hill /mountains 7 Biosphere reserves 8 National park and wildlife sanctuaries and reserves 9 Natural lakes, swamps Seismic zones tribal Settlements 10 Areas of scientific and geological interests 11 Defence installations, especially those of security importance and sensitive to pollution 12 Border areas (international) 13 Airport (for solid waste management projects) 14 Tiger reserves/elephant reserve/turtle nestling grounds 15 Habitat for migratory birds 16 Lakes (except irrigation tanks, devoid of natural habitats), reservoirs, dams 17 Streams/rivers/estuary/seas, waterways b. Subprojects that are expected to have only moderate environmental issues are categorised as E2. A project is categorized as E2 if its potential adverse environmental impacts are less adverse (in spread and severity) than those of E1 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 112 projects. These impacts are mostly generic in nature and in most cases, mitigation can be designed more readily than for E1 projects. Although the scope of assessment for an E2 project is project specific and examines the project's potential negative and positive environmental impacts, it recommends measures needed to prevent, minimize, mitigate, or compensate for adverse impacts and improve environmental performance. c. Sub Projects which are expected to have no environmental issues are categorised as E3 projects. Hence no environmental assessment is required for an E3 project beyond screening. However, it is expected that the design of these subprojects also incorporate measure to improve environmental performance. Sample / Generic ESMPs provided in Volume II can be used as guidance for preparing / adopting mitigation or management measures under all three categories. Table 5:3 Environmental Categorization of Projects Proposed Description Type of project Subproject Extent of Management measures Categories Environmental impacts E1 Major Project specific EA preferably by - Projects impacting sensitive environmental an independent agency. In case the environmental components issues expected DPR consultant undertakes the including natural habitats ESIA for better alignment with - Projects requiring CRZ project details; the ESIA will be Clearance (National Level) as reviewed by independent per CRZ Notification 2019 and consultant. /or Environmental Clearance as Specific mitigation/monitoring per EIA Notification 2006, of measures including those to MoEFCC improve environmental performance, ensure environmental sustainability and climate resilience/adaptation. E2 Moderate Project specific EA along with the - Projects with impacts less environmental DPR. ESMP including measures to adverse (in intensity and spread) issues expected improve environmental than the E1 category and mostly performance, sustainability, and generic in nature. climate resilience/adaptation. - Projects requiring only CRZ clearance (State Level) and/ or Environmental Clearance (State Level) E3 No Generic ESMP. - Projects which would improve environmental These will also consider measures the environment without any issues expected to improve environmental negative impacts. performance, sustainability, and - Research and Capacity building climate resilience/adaptation as activities part of overall design/plan Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 113 Specialists shall apply adequate experience and expertise-based judgment to determine the category of subprojects. Guidance on indicative categorization of projects is provided in Table 5.4. For projects not listed in the guidance tool, categorization will be done based on its environmental sensitivity. Any upward/ downward scaling of categories such as from E2 to E1 and vice versa requires proper justification, concurrence of NPMU and shall be in compliance with the national regulations and safeguard policies of the Bank. Table 5:4 Indicative Environmental and Social Category of Subproject Types Sl No Type of Projects Probable Categorization * A. Conservation of Coastal Resources Environmental Social 1. ICZM Plan Preparation, Marine Spatial Planning, Coastal E-2 S-2 Process Study, Biodiversity Assessments/Mapping, Conservation plans of marine habitats (marine national park, biosphere reserve, lake sanctuaries), Assessment of Fishing Zones 2. Protection for erosion, sand accretions and measures to E-1 S-2 manage salinity – both soft and hard methods (shall be taken up only if advised by Shoreline Management Plan / ICZMP) 3. Conservation and management of coral reefs, sea-grass, E-1 S-2 sea turtles, dolphins, and migratory birds and other marine biodiversity 4. Eco-restoration of sacred groves and coastal forests, E-1 S-2 wetlands, lagoons/estuaries 5. Mangrove restoration, shelterbelt plantation and E-2 S-2 stabilization/protection of sand dunes 6. Establishing Real time marine and coastal eco-system E-3 S-3 monitoring 7. Beach infrastructure development E-2 S-2 8. Database and capacity building for Biodiversity E-3 S-3 conservation, Documentation of marine and coastal diversity B. Coastal Pollution Management and Related Infrastructure Upgrade 1. Integrated Solid Waste Management a. Landfill Sites E-1 S-2 b. Compost Yard / other type of Composting E-1 S-2 Facilities (including small scale) c. Solid Waste Management including Collection & E-2 S-2 Transportation Vehicles (allowable only in case there is existing Treatment and Disposal facility, acceptable as per National Regulations/standards) Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 114 Sl No Type of Projects Probable Categorization * d. Any other Treatment and Disposal Facilities E-1 S-2 (including Waste to Energy) 2. Sewerage / Sanitation / Drainage a. Only Sewer Net Work (linked to existing Sewage E-2 S-2 Treatment Plant (STP) as per National Standards/regulations) b. Sewerage Network and Pumping Stations (linked E-2 S-2 to existing STP) c. Sewerage Network, Pumping Station and E-1 S-2 Treatment Plant d. Public convenience, Pay & use latrines E-2 S-2 e. Septic tanks E-2 S-2 f. Septage Treatment Plants/ Faecal Sludge E-1 S-2 Management/Tertiary Sewage Treatment g. Decentralised Waste Water Management E-1 S-2 h. Constructed wetlands for septage / sewage E-1 S-2 treatment i. Storm Water drainage E-2 S-2 3. Pilot projects on clean and renewable energy (small scale, E-2 S-2 portable) 4. Pilot projects on alternate/renewable energy (large scale, E-1 S-2 offshore) 5. Environmental parameters monitoring E-3 S-3 6. Marine litter and micro plastic management (Collection E-2 S-3 and Transport) 7. Marine litter and micro plastic management (Treatment) E-1 S-2 8. Clean beach program/Beach cleaning E-2 S-2 9. Environmentally Sustainable Fish Landing Site E-1 S-2 C. Livelihood security 1. Hatchery and Sea ranching E-1 S-2 2. Alternative Livelihood opportunities for inland fisherman E-3 community and Coastal Communities (portable devices, marketing, etc.) 3. Sustainable coastal Eco-tourism development E-2 S-2 (infrastructure and training) 4. Sustainable coastal Eco-tourism development (training) E-3 S-3 5. Energy generation using renewables (only installation of E-2 S-3 appliances) for livelihood support 6. Improving livelihood generation facilities (Landing site, E-2 S-2 Fish Auction Hall, Work Shelters jetties and chill room) 7. Coir Production E-2 S-3 8. Demonstration of salt resistant cultivation E-2 S-3 9. Development of Smart-Eco Villages E-2 S-2 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 115 Sl No Type of Projects Probable Categorization * 10. Development of Microenterprises for Women SHGs of E-3 S-3 Coastal Villages D. Others 1. Strengthening of environmental monitoring systems E-3 S-3 2. Studies including experiments with chemical/biological E-3 S-3 systems 3. Other studies/research activities on sensitive/critical E-3 S-3 marine habitats 4. Installation of Laboratories, Purchase of Laboratory E-3 S-3 equipment 5. Purchase of other equipment for investigation E-3 S-3 * Note: This is only an indicative categorisation based on project types. However, actual categorisation shall consider project activities/components (as it would differ based on requirements), and its impact and spread in the environment, locational sensitivities / and regulatory requirements. In addition, in case a subproject has more than one among these subcomponents, the higher category applicable for any subcomponent would be considered as the category for the subproject as a whole. Social categorisation of subprojects would be based on the following criteria. Table 5:5 Social Categorization of Projects Category Level of Issue Management Type of Projects Measure S1 Serious social SIA and RAP - If it involves acquisition of private issues expected land with major impacts (people lose more than 20 % of the productive assets) - If it involves physical displacement. - Restricted access to natural resources S2 Moderate social SIA and - If impacts are limited to less than issues expected Abbreviated 200 Persons or about 50 families RAP of minor nature (people lose less than 20 percent of the productive assets). - Loss of community property S3 No social issues Social - No private land acquisition or no expected; hence Screening impacts to PAPs. socially benign Report Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 116 In addition to addressing environmental and social issues, NPMU commits itself to explore opportunities for environmental and social enhancement in various sub-projects. A sample list of enhancement opportunities is listed out in Table 5.6. NPMU encourages the States / SPMUs/ / PEAs to identify such opportunities and include the same as part of project planning and implementation. This shall be communicated to the PEAs for inclusion while preparing the project details; along with the communication on screening and Terms of Reference (ToR) for environmental and social assessment. Table 5:6 Potential Environmental Enhancement Opportunities in SubProjects * Sl NO Project / Sub- Enhancement Opportunities Project A. Area ▪ Greening the area & Development of greenbelt (using natural/local plant Development varieties) for Environmental Improvement ▪ Energy efficient buildings/devices ▪ Green energy: Solar Power / Rain Water harvesting ▪ Eco-friendly solid and liquid waste management ▪ Systems approach to projects ▪ Total Sanitation ▪ Top soil management ▪ Development of Greenways, Importance to transport options ▪ Conservation and enhancement of archaeological and environmental features like hills, slopes, lakes/waterbodies, and others ▪ Design considerations to protect from extreme climatic events ▪ Use Natural materials, reuse alternate materials, local design features ▪ Soft measures for remediations/environmental improvement ▪ Public participation and awareness building (IEC) ▪ Reduce/Reuse/Recycle B Coastal ▪ Use of Natural Materials and enhanced techniques for coastal protection; Protection preferably soft methods (based on Shoreline Management plan) C Plantations ▪ Use of saplings which are grown with developed roots, good maintenance preferably through community support D Buildings ▪ Adopting traditional features well suited to climate ▪ Reduce the use of glass, prohibit the use of asbestos or hazardous materials ▪ Ensure water and sanitation facilities including for the disabled (or people of determination) ▪ Fire safety and emergency response facilities to be integrated into design ▪ No cutting of trees or disturbance to slopes on site ▪ Climate resilient buildings ▪ Universal access ▪ Reuse of materials ▪ Development and implementation of Rainwater Harvesting measures ▪ Development of greenbelt along the boundary ▪ Reusing waste water generated ▪ Use natural locally available or alternate construction materials ▪ Energy efficiency E Sewerage and ▪ Development of greenbelt for Environmental Improvement, odour Sanitation control ▪ Design of units and pipelines to withstand flood situation / high water table ▪ Reuse of treated effluent Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 117 Sl NO Project / Sub- Enhancement Opportunities Project ▪ Energy efficient pump sets ▪ Proper management of process rejects (even if minimal quantities) ▪ Reuse of rejects/wastes F Solid Waste ▪ Development of Green belts Management ▪ Treatment of leachate and landfill gases ▪ Energy generation from waste ▪ Recovery and Recycling of wastes ▪ Develop green parks, open up city green space ▪ Reclaim possible part for treatment/sorting/ other facilities G Inland ▪ Development of Parks and Recreational Facilities for eco-tourism and Waterways / Environmental Improvement Lakes, ▪ Protection of boundaries Waterbodies ▪ Reuse/recycle of weeds/silt in case of cleaning / deweeding / desiltation, and proper disposal of wastes ** Note: Enhancement opportunities may not be limited to this. PEAs are encouraged to follow additional enhancement measures to support project sustainability. ECoPs provided in Volume II also describe better environmental practices that can be adopted. 5.3 Project Preparation 5.3.1 Preparation of Terms of Reference for Environmental and Social Assessment NPMU / SPMUs utilize Technical Assistance funds to plan, develop and implement sustainable projects and studies for coastal management posed for funding under ENCORE Program by providing design and supervision management support services, awareness campaign programmes and strengthening the managerial capacity of the SPMUs. SPMUs will utilise the financial assistance available under this component for preparation of Detailed Project Reports (DPRs), and Environmental and Social Impact Assessments (ESIAs) in line with ESMF for impacts associated with the projects, through appointment of consultants. Based on subproject categorisation, SPMUs will provide the PEAs, the draft Terms of Reference (ToR) for undertaking the Environmental Assessment. PEAs will identify experienced consultants for preparation of ESIA along with DPR for E2 projects; and for specialised EA for E1 category projects. Generic ESMP modified suitably by the PEA with SPMUs guidance, based on project details (Refer Volume II) will be used for E3 category projects. The ESMPs shall be included in the bid documents and guide the contractor to prepare Contractors ESMP at the start of implementation for effective environmental management of the subproject and reporting. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 118 5.3.2 Need for Strategic Environmental and Social Assessment (SESA) Approach In addition to being an IPF, ENCORE also aims to use Development Linked Indicators (IPF + DLIs)79 . and as per WB guidance note, the scope of the environmental and social assessment includes the ‘area of influence’ of Bank-financed activities, which may span an entire sector or region. Hence, wider stakeholder consultations using the SESA approach shall be followed for environmental and social analysis of plans (such as ICZM Plan), policies, and projects of regional or sectoral importance; the outcomes of which are important for the overall success of the program. SESA approach to plan preparation is not an alternative to ESIA and it does not replace the need to do project specific environmental assessment. However, this is not mandatory as per Indian regulations. This can reduce the scope of ESIAs within its geographical scope and make it limited to specific project level issues and will identify opportunities to minimize the range of issues that will have to be dealt at the project level. Such an approach to plan preparation activities would complement the environmental impact assessment. The main difference is that such an approach applies in an earlier stage of decision making than the ESIA and at a broader, national level. While the ESIA is employed only in the case of the approval of proposed environmentally significant projects, the SESA approach is followed at the national planning level. Important strategic decisions with environmental significance are often made already in the course of national planning and programming (BMUB 2013)[6]. Thus, while the ESIA analyses specific projects the Strategic Environmental and Social Assessment (SESA) focuses on strategic directions which are incorporated in (public) plans and programs. It thereby ensures that potential impacts are “fully included and appropriately addressed at the earliest appropriate stage of decision-making” (Sadler & Verheem, 1996). The results obtained from the SESA approach are primarily relevant for national plans and programs and set the basis for strategic decisions. This addresses the coordination between different sectors, the appraisal of sectorial interests and objectives, as well as the ranking of priorities to establish coherent national policies. This can, for example, include the prioritization of individual technologies and their regional allocation. Compared to ESIA, the search for “reasonable alternatives taking into account the objectives and the geographical scope of the plan or programme” is important. While both ESIA and SESA are instruments for impact assessment, the scope of SESA is enlarged in order to adequately cover large scale developments or regional approaches that cannot be represented by single ESIAs. 79 IPF-DLI is a form of Investment Project Financing (IPF) and the IPF Policy, Directive and Procedure apply to it, as they do to regular investment lending. An IPF-DLI operation is subject to the same procurement, financial management, environmental and social, and anti-corruption requirements that govern any regular investment operation. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 119 Hence, it is recommended that ICZM plan preparation and other strategic plan preparation activities shall follow the SESA process to facilitate identification of its cumulative/regional impacts through stakeholder consultations, and to guide alternate development scenarios. It shall have provisions to identify such impacts early on; specially on natural resources, natural habitats including forests and plan for alternatives based on extensive stakeholder consultations. 5.3.3 Environmental and Social Impact Assessment (ESIA) • ESIA evaluates a project's potential environmental and social risks and impacts in the project area of influence, examines the alternatives (minimum three; including no project scenario), identifies measures to mitigate the environmental and social impacts and improvement of benefits throughout project implementation. Wherever feasible, preventive measures would be undertaken. (also refer guidance on EIA by MoEFCC). • The borrower is responsible for carrying out the ESIA as outlined in the ESMF and national regulations. ESIA shall start by the preparation of draft project documents (DPRs)/ Feasibility Report (after pre-feasibility report) ideally so that the findings/mitigation measures can be incorporated early on into the design. • Consultants are required to carry out ESIA with household surveys, consultation and focus group discussions with the general public and other stakeholders at different stages to invite suggestions and feedback. In the case of E1 and S1 projects, the environment and social assessment may be entrusted to consultants other than DPR consultants based on an agreed ToR to ensure independence in the assessment of the impacts. In case the EA for E-1 projects are being undertaken by DPR consultants for better integration with project design or considering the lack of available additional firms/expertise for certain type of projects; it is recommended to employ independent consultants (suitably selected as per expertise required considering the subproject details; this may be from another government agency as well) to review the same before approval and to ensure that all critical issues of environmental and social management are addressed in the project. Based on the outcome of consultations and survey results, mitigation plans as needed depending upon the nature and scale of impact will be prepared. The outcome of consultations will be incorporated into the mitigation plan or designs. The draft mitigation plans will be disclosed, and consultation will be held with the stakeholders including communities to explain a) the proposal, b) alternatives considered, c) expected impacts, d) content of the mitigation plans, e) process involved in the implementation of mitigation plans, f) responsibility of various institutions involved, g) grievance mechanisms, h) explanations on their comments/queries. Minutes of the stakeholder consultations would be presented in the ESIA. ESIA shall inform that in case the project involves forest restoration, the project design incorporates means of addressing the potential for forest restoration to improve biodiversity and ecosystem functions. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 120 • The opinion of the stakeholders and public shall be incorporated in the project through specific public consultations (preferably two public consultations; one at the start of the EA process and other; on the Draft Report) with prior notice. • In addition, the draft ESIA shall be made available in a public place in English and local language well; accessible to affected groups and local NGOs. • Implications of the available legislations and regulatory requirements and the requirements of the operational policies of the World Bank are also to be reviewed as part of the ESIA. The ESIA report shall meet the requirements of national and state level legislations and disclosure requirements of the World Bank. Necessary clearances shall be obtained for ESIA, as applicable. • ESIA report shall include an Executive summary, Introduction / Project background, Project Description including review of (three) alternatives (including no-project scenario), Review of Legislations, Baseline environmental and social conditions, Impact Evaluation, Public consultation details, Management and Monitoring Plan, implementation ESIA Budget. • The project DPR/ESIA will be reviewed at different stages by a technical review committee formed for the purpose of reviewing the reports submitted by the Consultants with support from environment and social specialists of SPMU / NPMU. The Review Committee shall comprise of representatives from SPMU/NPMU and other participating departments and other experts as suitable. • Draft final reports along of the ESIA along with observations/comments of the Technical Review Committee will be forwarded to the NPMU / World Bank for its review, comments and clearance as applicable (in case it is for State projects, E-1 and E-2 subprojects will be sent to NPMU and highest category /special projects (E1 and some E2 if applicable) will be forwarded to the World Bank for review; but for National Projects handled directly by NPMU; E-1, E-2 projects will be sent to the World Bank for review). The consultant’s contract shall have adequate provisions to ensure that they would incorporate all the comments of the review committee, SPMU, NPMU and the World Bank and finalise the ESIA report. • The final version of ESIA and ESMP and RAPs reports in English with a non- technical summary in respective local language, shall be disclosed as per applicable disclosure policy; in the websites of the NPMU/SPMU/PEAs/relevant departments and will be made available in places accessible to the local people. 5.3.4 Environmental Social Management Plan (ESMP) • The management plan shall consider various activities proposed under the project and provide management measures to be followed for different phases of implementation, along with the responsibility allocation for implementation and Monitoring plan. • Apart from addressing the issues, management measures shall also explore enhancement opportunities and their inclusion in project components shall be ensured. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 121 • The management measures identified shall be made part of the project components and shall be included in the bid documents appropriately. • Generic Environmental and Social Management Plans for various subprojects / activities expected are provided in Volume II. • The cost for implementation of the management measures, the institutional arrangements for monitoring, etc shall be included in the project cost. • Various good practices in the form of Environmental Codes of Practice (ECOPs) to guide the preparation of ESMPs is presented in Volume II. • For construction / EHS impacts; guidance includes The World Bank Group General EHS Guidelines contain information on cross-cutting environmental and social, health, and safety issues potentially applicable to construction and can be downloaded via the following link. https://www.ifc.org/wps/wcm/connect/topics_ext_content/ifc_external_corporate_si te/sustainability-at-ifc/policies-standards/ehs-guidelines Tabulated summary of key Environmental impacts and mitigation/management measures for probable types of subprojects/project components are provided in Volume II. This is just indicative and shall be updated and used as per probable impacts linked to project details and locational characteristics. 5.3.5 Cost for Mitigation Measures including Monitoring Plan The ESMP Cost shall be integrated into the Detailed sub-Project Report (DPR) and sub- project bid documents. This shall include cost for all mitigation measures and monitoring required during various stages of the project. Details on including these costs for mitigation measures in the cost tables of the contract shall be presented in ESIA. SPMU environmental specialist has to discuss this in detail with PEA to ensure the preparation and implementation of Contractors-ESMP and the inclusion of ESMP cost in contract documents. 5.3.6 Proposed Institutional Mechanism and Reporting Requirements for Subprojects Successful implementation of safeguards in subprojects can be ensured by defining the role of various officials in its implementation. ESMP should present the institutional responsibilities and time frame for the implementation of mitigation measures and monitoring. 5.4 Project Appraisal During the Project Appraisal, Environmental and social aspects will be cross-checked against the standards set in the ESMF for the type of environmental and social issues: a. Review of project designs, DPR, Cost Estimates and ESIA to check the adequacy of environmental and social assessment and management measures provided, b. Scope for enhancement opportunities. In case of the project involves forest restoration, the project design incorporates means of addressing the potential for forest restoration to improve biodiversity and ecosystem functions. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 122 c. Compliance with regulatory requirements and clearances d. Integration of environmental measures in to the design where ever relevant e. Arrangements for implementation of ESMP, including institutional capacity and contractual provisions f. Inclusion of management measures with provisions in the project cost g. Inclusion of ESMP provisions in the bid document h. Need for any legal covenant to address any specific environmental and social risks including regulatory risks (this could be an input to the sanction letter) i. Review of ESIA and mitigation plans (ESMP/RAPs) and their adequacy to response to ESMF provisions and magnitude and nature of impacts. j. Disclosure of project information and Public consensus on the project and locations/ sites involved. (Guidelines for disclosure and public consultation is provided as Volume-II) k. Readiness of the sites required for the project. The guidelines for selection of sites for various projects in provided in in Volume-II. 5.5 Project Implementation Project Implementation starts with bidding procedures. Right from the pre-bid stage, it is important to incorporate environmental and social conditions, so that the contractors are aware of and are prepared with adequate finances and institutional set up to ensure implementation of environmental and social enhancement measures and safeguards. 5.5.1 Incorporating ESMP/GESMP into Contract Documents This subsection provides guidelines on the integration of the ESMP / GESMP documents into the contract documents. With the revision to the World Bank’s Standard Bidding Documents in January 2017, Environmental and Social Health and Safety (ESHS) requirements are well defined in the bid documents. In addition, an ESHS Performance Security has been incorporated into the requirements from potential bidders for the implementation of works under project financing. This revision incorporates changes to enhance environmental, social, health and safety performance during all stages of the subproject. ESHS Performance Security Depending on the associated risk of the subprojects, an ESHS Performance Security, of 1-3% of the total contract value shall be maintained as per the Guidance provided supplementing the World Bank’s Standard Bidding Document. The total performance security for contracts will typically be 10 percent of the total contract value of which 3 percent should be allocated to the ESHS performance security, while; where a contract has a performance security of 20 percent the ESHS performance security is to be maintained at a maximum of 5 percent of the total contract value. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 123 The Environmental and Social Specialists and procurement team of the NPMU/SPMUs will be required to liaise to ensure that the following guidance is incorporated accordingly. Detailed Management Information System linking project details, scheduling and documentation to the ESIA process and ESMF implementation will support the NPMU in the effective preparation of safeguard instruments, supervision, and monitoring. All sections of the bid documents are to be reviewed in detailed and cross reference will need to be made to the safeguards policies and instruments relevant to the specific subprojects which have been prepared as per the requirements of this ESMF. Where required the SPMU Environmental and Social specialists may be required to update recommendations in the respective EA/ESMP to match the language in the Bid Document where major discrepancies have been noted to facilitate consistency in all documents. In projects where safeguards documents for environment and social are prepared independently, it is recommended that the Environmental and Social specialists of SPMU and PEAs, work together to ensure that social safeguard requirements are incorporated and Social Management Plans (SMPs) and EMPs are merged and represented as ESMP. This ESMF already includes guidance for ESMPs that incorporate the requisite measures for labor management, labor working conditions, worker health and safety, public health and safety and grievance redressal are incorporated in line with the project's parallel social safeguards instruments. The budget for complying with the ESMP needs to be worked out for each sub-project by working out the cost of implementing each ESMP mitigation measure. Where this is not possible, the provision of a minimum of 3 percent of the sub-project cost needs to be earmarked for complying with the ESMP. The contractor is required to provide a costing at minimum within this amount in his BOQ, listing itemized values for ESMP implementation. The language should indicate that the contractor will be required to provide an itemized costing with the BOQ within this allocation. For large scale contracts that are assessed as high risk during environmental and social screening, it is also requested for the contractors to have the following certifications in the Eligibility and Qualifications Subsection, in Section III of the Standard Bidding Documents, under Contractor Requirements. • Registration with ISO 14001 (Environmental Management) • Registration with ISO 45001/ OSHAS 18000/ or equivalent on (Occupational Health and Safety Management) • If not already registered, must be willing to register as such prior to requesting mobilization amount or any other payment for the contract Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 124 Guidance to incorporate Environmental and social requirements in contracts is provided here for easy reference: Environment requirements in the pre-bid documents 1. PEA issues pre-bid documents to shortlist contractors, based on their expression of interest and capability. It will be useful to mention that the contractor’s environmental and social management capability or experience is expected to be good. Incorporating ESMP in the bid document 2. The PEA issues the bid documents to the pre-qualified contractors. ESHS requirements, performance security, and ESMP should be included in the relevant locations of the bid documents in the following way: o Mitigation/enhancement measures & monitoring requirements tables: The cross-reference to these tables should be included in the “conditions of particular application (COPA)”, which is a part of the General Conditions of Contract (e.g. Section IV, Item 19.1 of the ICB). As a standard practice, there is an overall reference to the laws that have to be followed in this section/item. The relevant laws need to be mentioned here. In addition, the adherence to the mitigation/enhancement measures and monitoring requirements tables should be included. The two tables will have to be added as Annexes or the ESMP (without cost) as a whole should be attached. Either the Annexes or the appropriate section in the ESMP should be cross-referred in the description of this item. o Modifications/additions to the technical specifications: Due to the mitigation/enhancement measures included in the ESMP, there may be (a) additions/alterations required to the applicable specifications and (b) some new specifications. These are to be referred to in the section on “Supplementary Specifications” in the Technical Specifications Volume of the bid documents. Generally, the GoI applicable specifications are taken as followed and are not repeated in the bid documents. Changes and additions to these specifications are made through the inclusion of a section “Supplementary Specifications.” This section should also include additional technical specifications related to the ESMP or should provide a cross- reference to the specific section of the ESMP. o Cost table: All the items in the ESMP cost table relevant to the contractor have to be referred to in the Bill of Quantities (BoQ) table, which is a separate volume of the bid documents. It is to be noted that the BoQ table in the bid documents includes the various tasks to be done by the contractor under different categories. Against each task, the contractor will have to indicate a unit rate while completing the bid documents. o Drawings: Due to the mitigation/enhancement measures included in the ESMP, there may be (a) changes required to the drawings, and (b) new drawings. All of these drawings are to be reflected in the Bid documents under the separate Drawings Volume. If the drawings are included in the ESMP, then a cross-reference should be provided in the Drawings Volume. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 125 Developing the ESMP to suit the bid/contract documents As one of the intentions is to integrate the ESMP requirements into the bid documents/contract Agreement, the ESMP should be developed keeping the following in mind: 1) Mitigation/enhancement measures table – description: In the Mitigation/ Enhancement Measure table, the text describing each measure should not include/repeat what is already covered under the technical specification, which is being cross-referred. The text should be short, clear and succinct. The description should focus on “what” and “where” of the mitigation/enhancement measure as the “how” of the measure is covered under the specification. 2) Monitoring requirements table: There are certain monitoring requirements for the contractor. While developing the Monitoring Requirements table, those that pertain to the contractor should be clearly separated. 3) Technical specifications: The modifications to the specifications and the additional specifications should be separately listed. These should be included as Annexes in the ESMP. The (added or modified) technical specifications should be adequately detailed to avoid problems (including that of interpretations) at site. 4) Drawings: The modifications to the drawings and the additional drawings should be included as Annexes in the ESMP. It is important to note that all drawings included/added should be “execution drawings” detailed as per the requirement of the particular item so as to execute at the site with adequate quality control and workmanship. (Also, it is important to note that the quality of BoQ [or cost estimate] and technical specifications part of the contract document depends on the degree of detailing in the drawings). 5) Cost table: The items pertaining to the contractor should be clearly separated from those that are to be incurred by the PEA, supervision consultant or any other agency organization. 6) Timing for finalizing ESMP: It is best to finalize the ESMP before finalizing the bid documents. This is required to fully reflect the sections of the ESMP relevant to the contractor in the bid documents and to ensure full integration. 7) Variation orders: Once the completed bids have been received from prospective contractors, the PEA takes a decision based on the costs and the technical merit of the bids. Following the decision, the implementing agency and the chosen contractor sign and counter-sign the completed bid documents. It becomes the contract agreement thereafter. If issues have been missed in the bid documents, it cannot be amended at the time of signing the contract agreement stage unless there is a really strong justification for the same. If there is an ESMP cost item that is not reflected in the BoQ of the signed contract agreement, the PEA may issue a variation order. The contractor will quote a rate and the task will be implemented. This issue of variation orders is standard practice and is generally used. However, the intent of good contracting practices is to minimize variation orders. 5.5.2 Onsite implementation of ESMP The contractor shall implement all the ESMP measures applicable for the project right from project inception. This shall be discussed with site engineers and workers and record on its implementation shall be maintained. In case PEA requires the support of PMC (with experienced subject specialists) considering the specialised needs of the project, SPMU may appoint PMC for the same. PEA, with or without the support of Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 126 PMC will monitor the implementation of ESMP measures during implementation monitoring and report to SPMU. The contractors / NGOs / CBOs who would be implementing the projects on site shall have environmental, social, health and safety specialists for onsite implementation of ESMP. 5.6 Monitoring and Evaluation 5.6.1 Sub-Project Monitoring NPMU / SPMU shall monitor all projects that it finances to ensure conformity to standards during construction, operation, and maintenance. Monitoring of Environmental and Social components will be carried out through environmental and social compliance reports that form part of Quarterly Progress Reports. Based on the verification of progress reports and field visits, these compliance reports and compliance with other loan disbursement conditions, subsequent instalments will be disbursed. NPMU shall ensure that the SPMUs make adequate internal arrangements to monitor the ESMP/SMP implementation quarterly, receive regular monitoring and progress reports from PEAs/PMCs and in turn submit regular progress reports including environmental and social compliance reports to NPMU. This monitoring requirement will be described in the ESMPs. The model format for the preparation of the ESMF compliance report is provided in Volume-II. SPMU will undertake quarterly field visits to those projects which are under implementation to review implementation of environmental and social safeguards and the findings will be shared with respective implementing agencies for their follow-up. The non-compliance and their remedial measures will be highlighted in these reports which will be communicated and followed-up. 5.6.2 Construction Supervision and Quality Control Construction Supervision and Quality Control Consultants will also be hired by SPMUs to supervise work quality. They will also have a dedicated Environment, Social, Health, and Safety officer to monitor ESMP implementation, labour management and occupational health and safety risks. For projects involving Natural Habitats, Quality Assurance Consultants will also monitor the implementation of mitigation measures through experts with specialisation in biodiversity conservation and management. 5.6.3 Annual Environmental and Social Audit NPMU will undertake annual audits of its portfolio to review the status of ESMF compliance. The audit will focus on the process followed for categorization and approval of E & S reports, disclosures and related aspects. The audit will also be based on field visits to all ongoing E-1, and S-1 projects and sample E-2 and S-2 projects to verify the implementation on the ground and solicit feedback from the affected people Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 127 and other stake holders. The audit will be carried out every year for the activities completed until the previous financial year. The draft report shall be forwarded to the World Bank for review and suggestions; and upon approval after incorporating the comments, the final audit report will be disclosed. The Terms of Reference for ESMF Audit is presented in Volume-II. The Auditors shall: • Support the SPMU / NPMU in preparing the audit plan. • Prepare compliance reports for sub-project activities in line with ESMF guidelines and other statutory requirements as applicable through scheduled or unscheduled audits. • Conducting random field visits and review compliance, especially in environmentally or socially sensitive areas. • Review the performance of the project through an assessment of periodical monitoring reports submitted by the line departments and SPMUs. • Share audit findings with the SPMUs / NPMU to aid in timely decision making and adopting appropriate mitigation action/s, if necessary. NPMU will review these audit reports and identify technical, managerial, policy or regulatory issues with regards to the compliance of the ESIA and ESMP reports. The identified technical issues will be duly incorporated in the subsequent projects, policy and regulatory issues will be debated internally by the NPMU and determine the need for appropriate interventions. These interventions/action plans will be communicated to SPMUs for actions. These interventions may include appropriate revision of institutional aspects, monitoring mechanism, revision / updation of ESMF document or suitable analytical studies to influence policy or programs of the State. The audit observations/recommendations will be complied with and followed-up as part of monitoring by SPMU / NPMU. This, ESMF ensures the following monitoring and reporting requirements: • Reporting on Safeguards / ESMPs: Monthly (or as and when required) Implementation Report by Contractor to PEA; Monthly Supervision Report by PEA / PMC to SPMU, Quarterly report by SPMU to NPMU (based on monthly report by PEAs/PMCs, Monitoring report by Quality assurance Consultants and quarterly supervision by SPMU) • Annual visit to sample sites by NPMU (including accompanying the World Bank Missions) • Safeguards monitoring report by Quality Assurance Consultants along with monitoring of Civil Works when the works are ongoing and at work exit/operations. • Annual Environmental and Social Audit for select projects (all E1, S1, and select E2, S2) by independent consultants. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 128 • Detailed Management Information System linking project details, scheduling and documentation to the ESIA process and ESMF implementation will support the NPMU in the effective preparation of safeguard instruments, supervision, and monitoring. 5.7 Public Consultation and Stakeholder Participation Public consultation shall be carried out at various stages of the project preparation. As part of the environment and social assessment, consultations will be carried out by using appropriate instruments including Focus Group Discussions (FGDs), stakeholder consultations, etc. Specific consultations will be held near the sites proposed to seek opinions/suggestions of the hosts and the communities involved. The outcome of consultations will be incorporated as appropriate in the designs and mitigation plans. As part of such consultations, the draft Mitigation Plans will also be presented and explained to the people on the content and process of the implementation of the plans. This would ensure ‘buy in’ for the projects by the host communities, project affected/involved communities, all line departments and other agencies concerned; and lead to foster project ownership by them, which is essential for the success of the subprojects. Public consultation requirements, process to be followed, reporting mechanism and other relevant details are provided in this ESMF. The PEAs shall also hold consultations at district, block and community level to facilitate involvement of stakeholders and solicit feedback on sub-project identification/selection, preparation/design, implementation plans and other such key elements of project delivery. Key stakeholders such as p roject affected persons, opinion makers, experts, and different department personnel shall be consulted. Stakeholder involvement mechanisms are/will be central to the design and implementation of the project and provide opportunities for information sharin g, consultation, and collaboration measures. While consultations during the planning stage ensures participation in site selection and design, consultations during the implementation phase encourages community feedback for more participatory monitoring. Guidance for this purpose has been laid out in this ESMF; to ensure proper consultation and involvement of key stakeholders during key stages of sub-project preparation and implementation. 5.7.1 Public Disclosure The following documents shall be disclosed in the Offices and websites of the NPMU, SPMU, and PEAs. a. ESMF for ENCORE b. Approved ESIA reports in English c. A non-technical summary of ESIA and ESMF in local languages of the place of implementation, d. ESMP/RAP/ARAP/TPP other safeguards documents e. Annual E & S Audits Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 129 5.7.2 ESMF and Technical Assistance (TA) activities Applicability of ESMF for Technical Assistance (TA) undertaken with support from World Bank Loan: Many preparatory studies/research activities are expected to be undertaken under ENCORE, which may be financed/implemented outside or within the ENCORE Program. Wherever feasibility or DPRs are prepared, the corresponding ESIA/SIA and RAP/ESMP/TPP preparation will be undertaken in accordance with the policy provisions. The outputs and reports of these studies will be submitted for the Bank’s review and endorsement. These will be approved by the competent authorities and disclosed. These will be prepared in a manner consistent with ESMF for ENCORE sub-projects. However, the implementation of these RAPs / ESMPs/TPPs will be taken up as and when they are implemented depending upon the circumstance and are not subject to the Bank’s supervision. Subproject Cycle and environmental and Social Safeguard requirements, with institutional responsibility and tools to be used, is depicted in the following Figure 5.2. Thus, Provisions in the ESMF for safeguards management include: • Dedicated Environmental and Social Specialists at all levels: Contractor, PEA, PMC, SPMUs, NPMU for ESIA preparation, approval, disclosure, supervision and reporting, • Reporting on Safeguards / ESMPs: Monthly (or as and when required) Implementation Report, by Contractor to PEA; Monthly Supervision Report by PEA / PMC to SPMU, Quarterly report by SPMU to NPMU (based on monthly report by PEAs/POMCs, Monitoring report by Quality assurance Consultants and quarterly supervision by SPMU), • Safeguards monitoring report by Quality Assurance Consultants along with monitoring of Civil Works when the works are ongoing and at work exit/operations, • Annual Environmental and Social Audit for select projects (all E1, S1, and select E2, S2) by independent consultants, and • Capacity building and cross learning for Environmental and Social Management. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 130 Reject In case of exclusions Technical Review Committee to Review DPR, EIA/SIA Quality Assurance Consultants Figure 5:2 Environmental and Social Requirements during Sub Project Cycle Environmental and Social Management Framework for ENCORE Project, 2019. Vol I 131 CHAPTER 6. RESETTLEMENT POLICY FRAMEWORK A Resettlement Policy Framework (RPF) is required when the extent of resettlement cannot be known at the appraisal stage. This framework provides for any situation that may arise where the need for temporary or permanent land acquisition or resettlement and rehabilitation is inevitable. Resettlement and compensation activities should be conceived and executed in a sustainable manner. The RPF is intended to (i) clarify resettlement principles, organizational arrangements and the design criteria to be applied to subprojects to be prepared during project implementation; and (ii) for use as a practical tool, to guide the preparation of the Resettlement Action Plan (RAP) depending upon the scale and severity of impacts. The objective of the RPF is to ensure that the Project Affected Persons (PAPs) get compensation for their loss, are offered resettlement measures, and are supported in improving or at least restoring their levels of living and income after the project impact to pre-project levels. The RPF is intended to safeguard the interests of the population impacted by the project, especially the poor and vulnerable. The RPF is based on applicable Policies of GoI and the World Bank. Both the RFCTLARR Act 2013 and the World Bank Operation Policy on involuntary resettlement aim to ensure that involuntary resettlement should be avoided or minimized, wherever feasible, exploring all viable alternative project designs, and where displacement is unavoidable, people losing assets, livelihood or other resources shall be assisted in improving or at a minimum regaining their former status of living at no cost to themselves. Also, the World Bank safeguards policy requires consultation with PAPs during planning and implementation of resettlement action plan and tribal development plan and public disclosure of drafts. Once the draft is prepared it is to be made available at a place accessible to, and in a form, manner, and language understandable to the displaced or affected people and local NGOs. Based on the detailed comparative analysis of RFCTLARR Act 2013 and the World Bank Operation Policy on involuntary resettlement, key differences identified and addressed under the Resettlement Policy Framework (RPF) are listed in the table below: Gap in RFCTLAR&R Act 2013 and the World Bank policy on involuntary resettlement Sl. Topics/ World Bank OP4.12 RFCTLAR&R Remarks / No. Measures taken to Issues/ Areas address in ESMF 1 Application Direct economic and social Section 2 Applicable to projects In line with bank of LA impacts that both result from where government acquires land OP 4.12 Bank-assisted investment for its own use, hold, and control, projects. Applies to all including PSU and for public components of the project purpose; that result in involuntary resettlement, regardless of the source of financing. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 132 Sl. Topics/ World Bank OP4.12 RFCTLAR&R Remarks / No. Measures taken to Issues/ Areas address in ESMF Principle of Involuntary resettlement Alternatives to be considered as In line with bank avoidance should be avoided where Act in chapter II, point # 4 (d) OP 4.12 feasible or minimized, says "extent of land proposed for exploring all viable acquisition is the absolute bare alternative project design minimum needed for the project; and (e) says land acquisition at an alternate place has been considered and found not feasible. Linkages OP 4.12 applies to all No such provision The RPF will be with other components of the project applicable for all projects that result in involuntary components of the resettlement, regardless of project or any the source of financing. It linked project also applies to other activities necessary to resulting in involuntary achieve its resettlement, that in the objective. judgment of the Bank, are(a) directly and significantly related to the Bank-assisted project, (b) necessary to achieve its objectives as set forth in the project documents; and(c) carried out, or planned to be carried out, contemporaneously with the project. 2. Application Same as above In addition to the above, Provision of OP of R&R 4.12 to apply. Section 2(3) land purchased by private company as prescribed by Govt. or when part acquired by govt 3. Affected area Involuntary take of land Section3(b): Area notified for Provisions of OP resulting in loss of shelter, ‘acquisition’ 4.12 will be loss of assets or access to applicable as Act assets, loss of income sources only notifies for or means of livelihood titleholders of private land 4. Family The definition of Section 3(m) includes a person, his and her spouse, minor family given in the children, minor brothers, andRFCTLAR&R Act sisters dependent. 2013 will be followed for both Widows, divorcees, abandoned titleholders and women will be considered as non-titleholders. separate families. 5. Affected Section 3 (a): whose land and The Act does not family for other immovable property support non- eligibility All adversely affected people acquired. titleholders on government land, whether have formal legal hence provision of Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 133 Sl. Topics/ World Bank OP4.12 RFCTLAR&R Remarks / No. Measures taken to Issues/ Areas address in ESMF rights or do not have formal (b)&(e): Family residing in OP 4.12 will legal rights on land affected areas such as labourers, prevail. The gap tenants, dependent on forest and has been addressed water bodies, etc whose primary in the entitlement source of livelihood is affected matrix of RPF in due to acquisition ESMF. (c)Scheduled tribes and other forest dwellers whose rights recognized under the Forest Dwellers Act 2006. (f) Family assigned land by state or central government under any schemes (g) Family residing on any land in an urban area that will be acquired or primary source of livelihood affected by acquisition. 6. Cut-Off date Date established by the Section 3 c (ii), (iv) (vi): Families Provisions of OP borrower and acceptable to residing for preceding 3 years or 4.12 will be Notice to the Bank. It is the date of the more prior to “acquisition of followed as affected census. land”. RFCTLAR&R Act person has no such Section 21 (1) The Collector shall provision for publish the public notice on his people living on website and cause public notice to public land. be given at convenient places on Moreover, or near the land to be taken, RFCTLAR&R Act stating that the government requires proof of intends to take possession of the residing in the land. and that claims to project area at least compensations and rehabilitation three years prior to and resettlement for all interests initial notice on in such land may be made to him. LA. 7. Non- Stand-alone SIA for all Section 6(2): Irrigation projects The provision of application investments where EIA is required under other OP 4.12 will be of Chapter II laws, provisions of SIA not followed. applicable. 7. Consultation Consultation a continuous Provisions of OP Section 4(1) date issued for first – Phase I process during planning and consultation with PRIs, Urban 4.12 will be during implementation local bodies, Municipalities, etcfollowed. The draft preparation to carry out SIA. and final SIA will be disclosed in Section 5: Public hearing of SIA public as per the in the affected area. Provide provision given in adequate publicity of date and RFCTLAR&R Act, time. 2013. 8. Time Draft Social Assessment, Section 4 (2): within six months No gap found. duration to Resettlement Action Plan and from the date of its RFCTLAR&R Act or Social Management commencement. specifies a Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 134 Sl. Topics/ World Bank OP4.12 RFCTLAR&R Remarks / No. Measures taken to Issues/ Areas address in ESMF prepare SIA Framework prepared before timeframe which is and SIMP appraisal. followed by the client. 9. Disclosure – To be disclosed before Section 6(1): Translated in local No gap found. Stage I appraisal. language available in PRI institutions and local urban government bodies; district administrative offices and websites of concerned government agency. 10. Formation of Appraised by Bank staff Section 7(1): Constitute a multi- No gaps found. Expert Group disciplinary Expert Group to appraise includes members of SIA and decentralized govt Institutes SIMP (PRIs, ULBs). 11. Time Before the decision meeting Section 7(4): Submit its report No gaps found. stipulated for for appraisal within two months from the date Group to of its constitution submit its report 12. Scope of Social Assessment, Section 7 (4) (a&b): assess No gap found. work of the resettlement action Plan whether it serves any public Expert group reviewed and appraised by purpose or not; if social costs Bank staff and approved by outweigh potential benefits then Regional safeguard advisor should be abandoned; Section 7 (5) (a&b): if serves a public purpose, then it has considered minimum land acquisition and alternate options to minimize displacement; potential benefits outweigh social costs 13. Consultation In practice, consultation Section 2 (2): Prior consent of No gap found. – Phase II workshops are organized in 80% and 70% of land owners in during project affected areas at PPP and where private company appraisal district and state levels. has approached the govt to acquire balance land has been obtained, 14. Disclosure – Information dissemination Section 7 (6): recommendations No gap found. Stage II through the planning and of the expert group under 7(4&5) implementation to be made public in local language in district and block administrative office and PRIs 15. Minimize Select a feasible design that Section 10: In case multi-crop No gap found. impact on has minimal adverse impact. land is to be acquired under multi-crop exceptional circumstances, the land area to be acquired cannot exceed the aggregate of land of all projects in district or state. The Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 135 Sl. Topics/ World Bank OP4.12 RFCTLAR&R Remarks / No. Measures taken to Issues/ Areas address in ESMF area to be acquired cannot exceed the total net sown area of the district or state. Wasteland equivalent to twice the area acquired will be developed. 16. Information Continuous part of the Section 11 (1), (2) & (3): Notice No gap found. disseminatio preparation and participation published in local language and n of meetings called of gram sabhas, preliminary municipalities to provide full notice information about the purpose of the project, summary of SIA and particulars of administrator appointed for R&R’ summary of R&R scheme 17. Updating To be part of RAP Section 11 (5): Once established No gap found. land records that the land is required for public purpose, accordingly notice to be issued under section 19 following which land records to be updated within two months 18. Census and To be part of RAP including Section 16 (1) (2): carry out a RFCTLAR&R Act preparation both titleholders and non- census of affected people and takes only of R&R titleholders their assets to be affected, titleholders into schemes livelihood loss and common account. Provision property to be affected; R&R of OP 4.12 to be scheme including time line for followed. implementation. 19. Information Section 16(4) & (5): mandatory Provisions of OP disseminatio to disseminate information on 4.12 to be followed. n and Public R&R scheme including hearing - resettlement area and organize a Stage III public hearing on the Draft R&R Consultation throughout the scheme in each Gram Sabha, process is mandatory Municipality and consultations in Scheduled area as required under PESA. 20. Approval of As part of RAP prior to Section 17 & 18: Draft R&R No gap found R&R appraisal Scheme to be finalized after Scheme addressing objections raised during the public hearing and approved. 21. Final Approved RAP including Section 19 (2): Only after the No gap found. declaration budgetary provisions to requiring body has deposited the of R&R implement it money will the govt issue the Scheme notice along with 19(1). 22. Time period Included in RAP - Time line Section 19 (2): the entire process No gap found. stipulated. synchronized with to update land records Government’s procedures or disseminate information, adopts innovative methods to preliminary survey, census, Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 136 Sl. Topics/ World Bank OP4.12 RFCTLAR&R Remarks / No. Measures taken to Issues/ Areas address in ESMF reduce the time which is hearing of objections, preparation based operated on the of R&R schemes and approval, principles of participation deposit of money must complete and transparency. within 12 months from the date on which section 11, the preliminary notice issued. Section 19 (7): If the final declaration not made within 12 months of section 11 (1), the process will lapse, except under special circumstances. 23. Preparation Section 20: Land marked, No gap found. of land measured for preparation of acquisition acquisition plans. plans 24. Hearing of Section 21(1) (2): Notices issued claims indicating govt’s intension to take possession of land and claims on compensation and R&R can be made not less than one month and not more than six months from the date of issue of section 21(1). 25. Time period Section 25: It is required to stipulated for announce the award within declaring the Included in RAP. 12months of issue of Section 19 award (final declaration to acquire land, approved R&R scheme) after completing land acquisition plans, hearing of objection, settling individual claims for declaration of the award. If award not made within the stipulated time, the entire proceedings will lapse. 26. LA Act 1984 Section 24: where award is not No gap found. deem to lapse declared under section 11, or and where made five years ago but RFCTLAR& land not taken in possession or R is where award declared but money applicable not deposited in the account of the majority of beneficiary. 27. Methodology Full replacement Cost Section 26 and First Schedule: No gap found. for Recognizes 3 methods and determining whichever is higher will be market value considered which will be for land multiplied by a factor given in Schedule First; compensation given earlier will not be considered; if rates not available Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 137 Sl. Topics/ World Bank OP4.12 RFCTLAR&R Remarks / No. Measures taken to Issues/ Areas address in ESMF floor price can be set; steps to be taken to update the market value. 28. Valuation of Full Replacement cost Section 29 (1) without deducting Provisions of OP structures the depreciated value. 4.12 29. Solatium and Section 30(1) 100% of the No gap found. interest compensation amount Section 30(3): 12% per annum on the market rate from the date of notification of SIA to the date of ward or land taken over 30. R&R Award Total cost included in RAP to Section 31, Second Schedule: A No gap found resettle and rehabilitate the family as a unit will receive R&R affected persons and assist in grant over and above the their efforts to improve their compensation and those who are livelihoods and standards of not entitled to compensation. living or at least to restore Second Schedule: Homeless them, in real terms, to pre- entitled to constructed house, displacement levels or to land for land in irrigation projects levels prevailing prior to the in lieu of compensation, in case of beginning of project acquisition for urbanization 20% implementation, whichever is of developed land reserved for higher owners at a price equal to compensation’ jobs or onetime payment or annuity for 20 years’ subsistence grant, transportation, land and house registered on joint name husband and wife, etc 31 Transparenc Section 37(1): Information of No gap found. y each individual family including loss, compensation awarded, etc will be available on the website. 38. Possession of Taking of land and related Section 38(1): Land will be taken No gap found. land assets may take place only over by the government within after compensation has been three months of compensation paid and, where applicable, and 6 months of R&R benefits resettlement sites and moving disbursed; infrastructure facilities allowances have been at resettlement sites will be provided to the displaced completed within 18 months from persons. the date of award made under section 30 for compensation; in case of irrigation and hydel projects R&R completed six months prior to submergence. 39. Multiple Section 39: Additional No gap found. displacement compensation equivalent to compensation determined will be paid to displaced Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 138 Sl. Topics/ World Bank OP4.12 RFCTLAR&R Remarks / No. Measures taken to Issues/ Areas address in ESMF 31. Acquisition Not permeable in bank Section 40 (5): 75% additional Provisions of OP for funded projects compensation will be paid over 4.12 will be emergency and above the compensation followed. purpose amount 32. Prior consent Affected persons to be Section 4: Public disclosure of No gap found. before consulted. SIA and R&R Plan is mandatory. acquisition and alienation 33. Development Indigenous Peoples’ Section 41: Separate No gap found. plans for SC Development plan required development plans to be and ST along with RAP. prepared, settle land rights before acquisition; provision of for Land for land is an option alternate fuel fodder, non-timber across all sectors. produce on forest land to be developed within 5 years; 1/3rd compensation amount to be paid as first instalment and rest at the time of taking possession; ST to be resettled within Scheduled area; land free of cost for community purpose; land alienation will be null and void and ST and SC considered for R&R benefits; fishing rights restored in irrigation and hydel projects; if wish to settle outside the district additional benefits to be provided in monetary terms; all rights enjoyed under other laws will continue. Second Schedule: additional provisions for SC&ST for land for land in irrigation projects, additional sum over and above the subsistence grant, 34. Institutional Institutional arrangement Section 43-45: Appointment of Provisions of OP arrangement must be agreed upon and administrator, R&R 4.12 will be included in the RAP Commissioner, when more than followed 100 acres of land is to be acquired, R&R Committee will be formed at project level, social audit to be carried out by Gram Sabha and Municipalities. 35. Change of Compensation and R&R Section 46(4): Land will not be No gap found. land use assistance should be transferred to the requisitioning disbursed before taking authority until R&R plan is not physical possession of land. fully implemented. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 139 Sl. Topics/ World Bank OP4.12 RFCTLAR&R Remarks / No. Measures taken to Issues/ Areas address in ESMF 36 Monitoring Indicators and monitoring Section 48-50: Set up National The Act does not and system included in RAP and State level Monitoring specify indicators. Evaluation Committee to review and monitor Provisions of OP progress 4.12 will be followed. 37. Authority to Section 51-74: The Authority No gap found settle claims will be set up to settle any legal disputes that arise from acquisition and R&R, the aggrieved party can move to the high court thereafter. 38. Exempt from Project to bear all taxes and Section 96: Compensation and No gap found tax and fee other expenses if new assets agreements will not be liable to are purchased by the PAP tax 39. No change in Section 99: Once the land is No gap found the status of acquired for a particular purpose, land acquired its purpose cannot be changed 40. Return of Section 101: If the acquired land No gap found unutilized remains unutilized for 5 years, land then it will be returned to the original owner, heir or included in land bank 41. Distribution Section102: 40% of the No gap found of increased appreciated value of acquired value of land land will be distributed to owners transferred provided no development has taken place. 42 Grievance Appropriate and accessible Section 15: Any person Since there is no Redress grievance mechanisms are interested in any land which has provision for local established Mechanism been notified under sub-section level grievance of section 11 as being required or mechanisms, the likely to be required for a public provision of this purpose, may within sixty days ESMF will be from the date of the publication followed. of the preliminary notification, has the right to object. The person can approach the Administrator of R&R and if not satisfied can to Commissioner R&R. The aggrieved person has the right to approach the judiciary as well. 6.1 Resettlement Policy Framework This project has been primarily designed ensuring that any chance of land acquisition has been avoided. Only public land is to be used in projects which will require land. This is in line with the objective of the policy and Government of India’s RFCTLARR Act 2013 and World Bank OP 4.12 that involuntary resettlement will be avoided and minimised by exploring different Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 140 design options. In other words, exploring various options and considering the best option which has minimum or no impact. However, since there are multiple interrelated interventions across fourteen States and UTs which are at the planning stage, a Resettlement Policy Framework (RPF) is required because the extent of resettlement cannot be known upfront for all interventions at the appraisal stage. This framework provides for any situation that may arise where the need for temporary or permanent land acquisition or resettlement and rehabilitation is inevitable. Resettlement and compensation activities should be conceived and executed in a sustainable manner. The RPF is intended for use as a practical tool, to guide the preparation of the Resettlement Action Plan (RAP) depending upon the scale and severity of impacts. The objective of the RPF is to ensure that the Project Affected Persons (PAPs) if there are any, get compensation for their loss, are offered resettlement measures and are supported in improving or at least restoring their levels of living and income after the project impact to pre- project levels. The RPF is intended to safeguard the interests of the population impacted by the project, especially the poor and vulnerable. The RPF is based on applicable Policies of GOI, State governments, and the World Bank. The nature and magnitude of social impact will be assessed through Social Impact Assessment and Resettlement Plan (RP) or Resettlement Action Plan (RAP) will be prepared and implemented to mitigate the adverse impacts to assist the affected people to improve their living standards. The RP/RAP shall be prepared in compliance with the Social Safeguards provided in this ESMF. Prior to the project implementation, the measures available in the RP /RAP shall be implemented. The broad categories of economic and social impacts that would be mitigated are: a) Loss of land and assets b)Loss of shelter or homestead lands c) Loss of income or means of livelihood d)Loss of access to productive resources, shelter/residences, recreational spaces e)Loss of collective impacts on groups such as loss of community assets, common property resources, and others. 6.2 Broad Principles The Policy aims to resettle and rehabilitate the affected persons on account of its sub projects in a manner that they do not suffer from adverse impacts and shall improve or at the minimum retain their previous standard of living, earning capacity and production levels. It is also the endeavour of the project that the resettlement shall minimize dependency and be sustainable socially, economically and institutionally. Special attention will be paid for the improvement of living standards of marginalized and vulnerable groups. This policy recognizes that involuntary resettlement dismantles a previous production System and a way of life, resettlement activities should be conceived and executed as sustainable development programs, providing sufficient investment resources to enable the persons Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 141 displaced by the project to share in project benefits. The project will assist the affected families to improve their livelihoods and standards of living or at least to restore them, in real terms, to pre-displacement levels or to levels prevailing prior to the beginning of project implementation. These guidelines detail out the assistance in re-establishing the homes and livelihoods of the Project Affected People (PAP) during the course of projects. ▪ All information related to resettlement preparation and implementation will be disclosed to all concerned, and community participation will be ensured in planning and implementation. ▪ The principles of mutual consent and negotiated settlement will also be used for land acquisition as required. ▪ The persons affected by the project who does not own land or other properties but who have an economic interest or lose their livelihoods will be assisted as per the broad principles brought out in this policy. ▪ Before taking possession of the acquired lands and properties, compensation and R&R assistance will be made to those who are available and willing to receive the entitlements in accordance with this policy. No civil works will be initiated unless RAP is fully implemented. ▪ There would be no/or minimum adverse social, economic and environmental effects of displacement on the host communities as the project does not envisage any physical relocation. In case there are physical relocation and displaced persons are resettled, specific measures will be taken in line with this RPF to ensure no adverse impact on the host population. ▪ The broad entitlement framework of different categories of project-affected people has been assessed and is given in the entitlement matrix. Provisions will be kept in the budget. However, anyone moving into the project area after the cut-off date will not be entitled to assistance. ▪ Three tiers appropriate grievance redress mechanism has been established at the project level to ensure speedy resolution of disputes. ▪ All activities related to resettlement planning, implementation, and monitoring would ensure the involvement of women. Efforts will also be made to ensure that vulnerable groups are included. ▪ All consultations with PAPs shall be documented. Consultations will continue during the implementation of resettlement and rehabilitation works. ▪ As required, a Resettlement Action Plan will be prepared including a fully itemized budget and an implementation schedule. The broad principles of the Resettlement and Rehabilitation (R&R) policy are as given below; ▪ All negative impacts including displacement should be avoided or minimized wherever feasible by exploring all viable alternative project designs. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 142 ▪ Where negative impacts are unavoidable, efforts should be made either to improve the standard of living of the affected persons or at least assist them in restoring their previous standard of living at no cost to them. ▪ Ensure people's participation during the course of the project cycle. ▪ Efforts should be made towards the enhancement of the positive impact of the projects. The project will broadly have three impacts that require mitigation measures. These are: ▪ Loss of immovable assets viz., land, house, commercial establishments wells, ponds, etc. ▪ Loss of livelihood or income opportunities viz, for agriculture labours, helping hands in commercial establishments, etc. ▪ Impact on the community in terms of loss of common property resources. The first two categories represent direct impacts on an identified population. The people likely to be affected will be surveyed and registered, and project monitoring and evaluation will compare long term impacts against baseline socio economic data. The third category represents a group impact, where gains and losses of a group-oriented nature are not quantifiable in terms of impact on the individual. Mitigation and support mechanisms will be collectively oriented, and the monitoring will focus on the impact on such groups. The provisions of Rights to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 and in case the State Governments has specific policies for mutual consent and negotiated settlement, the provisions of such policy could be used subject to their adherence to the provisions are within the broad framework of the Act and the World Bank Safeguard Policies. ▪ Support will be extended under the broad principles of this policy to meet the replacement value of the assets and loss of livelihood. ▪ The policy further recognizes the extension of support to non-titleholders for the loss of livelihood and replacement value for assets other than land. ▪ The common property resources will be replaced as far as feasible and if not, then assistance will be provided at replacement value to the group. The construction and installation works would involve the transportation of equipment and machinery during the installation phase and all efforts will be made during implementation to minimize any disturbance in the daily activities of the local people. Before taking possession of the acquired lands and properties, all compensation, resettlement, and rehabilitation would be made in accordance with this policy. In case of displacement, resettlement sites will be developed as part of the project. In such circumstances, care should be taken so that there is no/or minimum adverse social, economic and environmental effects of displacement on the host communities and specific measures would be provided in the Resettlement and Rehabilitation Action Plan (RAP) to mitigate any such impacts. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 143 • Before taking possession of acquired land, sufficient time would be provided to harvest the crop. • The implementation of the R&R Action Plan will be synchronized with the execution of works under the project. • The project will ensure that no civil works are initiated before compensation and assistance to the affected population has been provided in accordance with this policy. 6.3 Resettlement Action Plan (RAP) In case the project requires involves land acquisition against compensation or loss of livelihood or shelter, the project shall ensure that a satisfactory RAP has been prepared and consulted with the affected person and the local community. The contractor shall not start the works until compensation and assistance has been made available in accordance with the framework. The Project Authority will undertake a survey for the identification of the persons and their families likely to be affected by the project. Every survey shall contain the following municipality/ward or village-wise information of, the project affected families: ▪ Members of families who are residing, practicing cultivation, any trade, or any other vocation in the project affected area; ▪ Project Affected Families who are likely to lose their house, commercial establishment, agricultural land, employment or are alienated wholly or substantially from the main source of their trade occupation or vocation or losing any other immovable property. ▪ Agricultural labourers and non-agriculture labourers. ▪ Losing access to private property or common property resources ▪ Loss of common property resources The project on completion of the survey will disseminate the survey results among the affected community. Based on the social impact assessment survey, we will prepare an action plan to mitigate or minimize the adverse impacts as identified during the survey. The draft mitigation plan in the form of a resettlement action plan (RAP) will be again disseminated among the affected individuals/community. The feedback received from the affected groups will be incorporated to the extent possible before the finalization of the RAP. RAP document provides a link between the impacts identified and proposed mitigation measures to realize the objectives of involuntary resettlement. The RAPs will consider the magnitude of impacts and accordingly prepare a resettlement plan that is consistent with this framework for Bank approval before the project activities are accepted for Bank financing. In case the project affects more than 200 people due to involuntary land taking and/or physical relocation and where a full Resettlement Action Plan (RAP) must be produced and in case affected persons are less than 200 people, the project will require an abbreviated RP (Resettlement Plan). The above plans will be prepared as soon as component wise project activities are finalized, prior to the Bank’s approval of corresponding civil works bid document. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 144 Projects that are not expected to have any land acquisition or any other significant adverse social impacts; on the contrary, significant positive social impact and improved livelihoods are exempted from such interventions. Every Resettlement Action Plan (RAP) prepared shall contain the following particulars. Baseline: 1. Village-wise or municipality-wise list of project affected families and likely number of displaced persons by impact category. 2. Family-wise and the extent and nature of land and immovable property in their possession indicating the survey numbers thereof held by such persons in the affected zone. 3. Socio-economic survey of affected people including income/asset survey of PAPs. 4. Information on vulnerable groups or persons for whom special provisions may have to be made Impact: 1. The extent of area to be acquired for the project, the name(s) of the corresponding village(s) and the method employed for acquiring land with the relevant documentation. 2. Adverse impact on common property resources including cultural properties 3. Impact on host community due to labour influx 4. Any indirect impact Quantification of impacts in terms of number of 1. agricultural labourers in such area and the names of such persons whose livelihood depend on agricultural land to be acquired; 2. persons who have lost or are likely to lose their employment or livelihood or who have been alienated wholly and substantially from their main sources of occupation or vocation consequent to the acquisition of land and / or structure for the project; 3. occupiers on the government land, if any; 4. number of public utilities, government buildings, cultural properties that are likely to be affected. Mitigation Measures and Entitlements: 1. Comprehensive list of benefits and packages which are to be provided to project affected families by impact category. 2. Measures to address the impact on the host community due to the influx of migrant labour. 3. Gender Action Plan Relocation: 1. Details of the extent of land available which may be acquired in the settlement area for resettling and allotting of land to the project affected families. 2. Details of the basic amenities and infrastructure facilities that are-to be provided for resettlement. Consultation Results and incorporation of community suggestions/feedback in project design Implementation Arrangements Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 145 1. Institutional mechanism for RAP implementation. 2. Consultation strategy; a disclosure plan and a capacity building plan 3. Grievance redressal mechanism 4. The time schedule for shifting and resettling the displaced families in resettlement zones 5. Monitoring and Evaluation 6. Mechanism for internal monitoring 7. Mechanism for external evaluation 8. Indicators for monitoring and evaluation; and 9. Budget The RAP will be developed based on the Right to Fair Compensation and transparency in land Acquisition, Rehabilitation and Resettlement Act, 2013; State Acts (Refer Annexure III) and World Bank Operational Policy 4.12 on involuntary resettlement. 6.4 Delayed Compensation Adjustment The project through District Collector shall disbursement the compensation as per clause 38 (1) of RFCTLAR&R Act, 201380. As per section 77. (/) of the Act, on making an award under section 30, the Collector shall tender payment of the compensation awarded by him to the persons interested entitled thereto according to the award and shall pay it to them by depositing the amount in their bank accounts. In case collector fails to do so, as per section 80 of the Act, “When the amount of such compensation is not paid or deposited on or before taking possession of the land, the Collector shall pay the amount awarded with interest thereon at the rate of nine percent per annum from the time of taking possession until it shall have been so paid or deposited. Provided that if such compensation or any pan there off not paid or deposited within a period of one year from the date on which possession is taken, interest at the rate of fifteen percent per annum shall be payable from the dale or expiry of the said period of one year on the amount of compensation or part there of which has not been paid or deposited before the date of such expiry. Table 6.1: Entitlement Matrix S. Application Definition of Entitlement Details No. Entitled Unit A. Loss of Private Agricultural, Home-Stead & Commercial Land81 1 Land for the Titleholder Compensation at Market a) Land for land, if available. Or, Cash Project family. and value, Resettlement and compensation for the land at families with Rehabilitation replacement value, which will be traditional land determined as provided under Right section 26 of the RFCTLARR Act 2013. b) The land if allotted will be in the name of both husband and wife. 80 The Collector shall take possession of land after ensuring that full payment of compensation as well as rehabilitation and resettlement entitlements are paid or tendered to the entitled persons within a period of three months for the compensation and a period of six months for the monetary part of rehabilitation and resettlement listed in the Second Schedule commencing from the date of the award made under section 3O 81 One USD is equivalent to INR 70.90 as on September 27, 2019 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 146 S. Application Definition of Entitlement Details No. Entitled Unit c) If post-acquisition, residual land is economically unviable, the land owner will have the choice of either retaining or sell off the rest of the land. d) Refund of stamp duty and registration charges incurred for replacement land to be paid by the project; replacement land must be bought within a year from the date of payment of compensation to project affected persons. e) Subsistence allowance of Rs. 36000 as one-time grant f) One-time grant of Rs. 500,000 or annuity g) Compensation at market value for loss of crops if any Residual land Titleholder family Compensation 6.4.1.1.1.1 In case residual land is found to be and economically unviable, PAPs have the at replacement value, choice of: families with Resettlement and a) selling off the residual land at the traditional land Rehabilitation market value to the project Right b) take 25% of the compensation value and retain the land parcel. B. Loss of Private Structures (Residential/Commercial) 2 Loss of Title Holder/ Compensation at Market a) Cash compensation for the structure Structure Owner value, Resettlement & at the Market value which would be Rehabilitation determined as per as per section 29 Assistance of the RFCTLARR Act 2013. House under Indira AwasYojana in rural area or Rs 50000 in lieu off and house under RAY in urban area or Rs 100,000 in lieu off. The house if allotted will be in the name of both husband and wife. b) Right to salvage material from the demolished structures. c) Three months' notice to vacate structures. d) Refund of stamp duty and registration charges for purchase of new alternative houses/shops at prevailing rates on the market value as determined in (a) above. Alternative houses/shops must be bought within a year from the date of payment of compensation. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 147 S. Application Definition of Entitlement Details No. Entitled Unit e) In the case of partially affected structures and the remaining structure remains viable, an additional10% to restore the structure. In the case of partially affected structures and the remaining structure becomes an unviable additional 25% of the compensation amount as severance allowance. f) Subsistence allowance equivalent to Rs. 36000 as a one-time grant. g) Each affected family getting displaced shall get a one-time financial assistance of Rs 50,000 as a shifting allowance. h) Each affected family that is displaced and has cattle, shall get financial assistance of Rs 25,000/- for construction of cattle shed. i) One-time grant of Rs. 50,000 as resettlement assistance j) Each affected person who is a rural artisan, small trader or self-employed person and who has been displaced (in this project owner of any residential-cum commercial structure) shall get a one-time financial assistance of Rs 25,000/-for construction of working shed or shop. k) One-time grant of Rs. 500,000 3 Structure Tenants/ Lease Resettlement & a) Registered lessees will be entitled to Holders Rehabilitation an apportionment of the Assistance compensation payable to structure owner in case the lessee has erected any art of1 the structure as per applicable local laws. b) In the case of tenants, three months written notice will be provided along with Rs 50,000 towards shifting allowance. C. Loss of Trees and Crops 4 Standing Owners and Compensation at market a) Three months advance notice to Trees, beneficiaries value project affected persons to harvest Crops (Registered/ Un- fruits, standing crops and removal of registered tenants, trees. contract b) Compensation to be paid at the rate cultivators, estimated leaseholders & by: sharecroppers i) The Forest Department for timber trees ii) The State Agriculture Extension Department for crops Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 148 S. Application Definition of Entitlement Details No. Entitled Unit iii) The Horticulture Department for fruit/flower bearing trees. c) Registered tenants, contract cultivators & leaseholders & sharecroppers will be eligible for compensation for trees and crops as per the agreement document between the owner and the beneficiaries. d) Un-registered tenants, contract cultivators, leaseholders & sharecroppers will be eligible for compensation for trees and crops as per mutual understanding between the owner and the beneficiaries. D. Loss of Residential/ Commercial Structures to Non-Titled Holders 5 Structures on Owners of Resettlement & a) Non-vulnerable encroachers shall be Government Structures or Rehabilitation given three months' notice to vacate land Occupants of Assistance occupied land structures b) Vulnerable encroachers82 will be identified as per provided cash assistance at Project Census replacement cost for loss of Survey structures as described in section 29 of the RFCTLARR Act 2013. c) Any encroacher identified as non- vulnerable but losing more than 25% of the structure used will be paid cash assistance at replacement cost for loss of structures. The amount will be determined as per section 29 of the RFCTLARR Act 2013. d) All squatters to be paid cash assistance for their structures at replacement costs which will be determined as mentioned in section 29 of the RFCTLARR Act 2013. e) All squatters (other than kiosks) will be eligible for a one-time grant of Rs 36000 as a subsistence allowance. f) All squatters other than Kiosks will be given a shifting allowance of Rs 50,000 per family as a one-time grant for a permanent structure and Rs. 30,000 for a semi-permanent structure and Rs. 10,000 for a temporary structure. g) Each affected person who is a rural artisan, small trader or self- employed person assistance' of Rs 82 Vulnerable encroachers will include those who (i) are either below poverty line; or (ii) women headed households; or (iii) belongs to scheduled community as caste or tribe; or (iv) elderly or disabled Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 149 S. Application Definition of Entitlement Details No. Entitled Unit 25,000/- for construction of working shed or shop. h) In the case of Kiosks, only Rs. 5000 will be paid as a one-time grant. E. Loss of Livelihood 6 Families Title Holders/ Resettlement & a) Subsistence allowance of Rs. living within Non-Title Rehabilitation 36,000 as a one-time grant. (PAPs the project holders/ Assistance covered under 1(f), 2 (f) and 5 (e) area sharecroppers, above would not be eligible for agricultural this assistance). labourers and b) Training Assistance of Rs 10,000/- employees for income generation per family. c) Temporary employment in the project construction work to project affected persons with particular attention to vulnerable groups by the project contractor during construction, to the extent possible and preference in the employment of semi-skilled and unskilled jobs in the project with adequate training for the job. F. Additional Support to Vulnerable Families 7 Families As per the Resettlement & One-time additional financial assistance within the definition of Rehabilitation of Rs. 50,000. project area vulnerable Assistance Squatters and encroachers already covered under clause 5 are not eligible for this assistance. G. Loss of Community Infrastructure/Common Property Resources 8 Structures & Affected Reconstruction of Reconstruction of community structure other communities community structure and and Common property resources in resources (e.g. and groups common property consultation with the community. land, water, resources access to structures, etc.) within the project area H. Temporary Impact During Construction 9 Land & assets Owners of land & Compensation for Compensation to be paid by the temporarily Assets temporary impact during contractor for loss of assets, crops and impacted construction e.g. damage any other damage as per prior agreement during to the adjacent parcel of between the ‘Contractor’ and the construction land/assets due to the ‘Affected Party’. movement of vehicles for transportation of equipment, machinery and construction activities for infrastructure development. I. Resettlement Site 10 Loss of Displaced Provision of resettlement Resettlement sites will be developed as residential titleholders and site/ vendor market part of the project if a minimum of 25 structures non-titleholders project displaced families opt for Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 150 S. Application Definition of Entitlement Details No. Entitled Unit assisted resettlement. Vulnerable PAPs will be given preference in allotment of plots/flats at the resettlement site. Plot size will be equivalent to size lost subject to a maximum of provision given in the RFCTLARR Act 2013. Basic facilities shall be provided by the project at the resettlement site as per the provisions given in the Third Schedule of RFCTLARR Act 2013. Similarly, if at least 25 displaced commercial establishments (small business enterprises) opt for shopping units, the Project Authority will develop the vendor market at a suitable location in the nearby area in consultation with displaced persons. Basic facilities such as approach road, electricity connection, water, and sanitation facility, will be provided in the vendor market by the project. Vulnerable PAPs will be given preference in allotment, of shops in the vendor market. One displaced family will be eligible for only one land plot at the resettlement site or shop in the vendor market. J. Land on lease 11 Titleholders Land Owners/ Annual Lease rental a) Annual Lease Rent as per pre-agreed Titleholders for use of land rate with the land owners giving consent for sparing their land for the project b) Provisions regarding the increase in lease rent on predetermined rates and timeframe c) Provisions related to loss of structure/ trees/ crops as per the provisions of Clause 2 and 4 respectively 12 Agricultural Non-Title As per Clause 6 above Labor holders/ sharecroppers, agricultural labourers and employees Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 151 CHAPTER 7. INDEGENOUS PEOPLES PLANNING FRAMEWORK 7.1 Introduction The Indigenous People (IPs) who are known as the tribal people in India are often vulnerable in the process of implementing development projects because of their cultural autonomy this group endure specific disadvantages in terms of social indicators of quality of life, economic status and usually as the subject of social exclusion. The term “Indigenous Peoples” is used in a generic sense to refer to a distinct, vulnerable, social and cultural group possessing the following characteristics in varying degrees. The IPPF 83is important as this project covers all coastal states of India. Approximately 5.3 percent of the total population in coastal districts of India belongs to various tribal groups. The table below provides the percentage of tribal population against the total population of the district. Table 7.1 Distribution of Tribal Population in Coastal Districts Sl No District Population Population Proportion of ST population (ST) Number to total population Number Total Per cent 1 North Twenty-Four 198,936 8,934,286 2.2 Parganas 2 Medinipur 798,684 9,610,788 8.3 3 South Twenty-Four 84,766 6,906,689 1.2 Parganas 4 Baleshwar 228,454 2,024,508 11.3 5 Bhadrak 25,141 1,333,749 1.9 6 Kendrapara 6,822 1,302,005 0.5 7 Jagatsinghapur 8,640 1,057,629 0.8 8 Khordha 97,186 1,877,395 5.2 9 Puri 4,482 1,502,682 0.3 10 Ganjam 90,919 3,160,635 2.9 11 Gajapati 263,476 518,837 50.8 12 Kutch 130,138 1,583,225 8.2 13 Ahmadabad 58,035 5,816,519 1 14 Rajkot 13,163 3,169,881 0.4 15 Jamnagar 10,459 1,904,278 0.5 16 Porbandar 6,456 536,835 1.2 17 Junagadh 18,832 2,448,173 0.8 18 Amreli 3,256 1,393,918 0.2 19 Bhavnagar 7,298 2,469,630 0.3 20 Anand 22,835 1,856,872 1.2 83 Given the broad geographical coverage of the project, a framework IPPF has been prepared and disclosed on precautionary basis. It is going to be used for screening of all ENCORE sub-projects and, if presence of tribal population is established in any sub-project, Free, Prior and Informed Consultation will be carried out and Indigenous Peoples Plan (IPP) will be prepared for that sub- project. Respectively, the regional safeguards unit has reviewed and cleared the IPPF but not any individual IPP. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 152 Sl No District Population Population Proportion of ST population (ST) Number to total population Number Total Per cent 21 Bharuch 444,043 1,370,656 32.4 22 Surat 1,408,270 4,995,174 28.2 23 Navsari 591,164 1,229,463 48.1 24 Valsad 772,405 1,410,553 54.8 25 Diu 116 44,215 0.3 26 Daman 13,881 113,989 12.2 27 Dadra & Nagar Haveli 137,225 220,490 62.2 28 Thane 1,199,290 8,131,849 14.7 29 Mumbai 20,666 3,338,031 0.6 30 Raigarh 269,124 2,207,929 12.2 31 Ratnagiri 20,102 1,696,777 1.2 32 Sindhudurg 4,952 868,825 0.6 33 Srikakulam 151,249 2,537,593 6 34 Vizianagaram 214,839 2,249,254 9.6 35 Visakhapatnam 557,572 3,832,336 14.5 36 East Godavari 191,561 4,901,420 3.9 37 West Godavari 96,659 3,803,517 2.5 38 Krishna 107,611 4,187,841 2.6 39 Guntur 208,157 4,465,144 4.7 40 Prakasam 118,241 3,059,423 3.9 41 Nellore 242,257 2,668,564 9.1 42 Uttara Kannada 23,781 1,353,644 1.8 43 Udupi 41,613 1,112,243 3.7 44 Dakshina Kannada 62,936 1,897,730 3.3 45 North Goa 281 758,573 0 46 South Goa 285 589,095 0 47 Lakshadweep 57,321 60,650 94.5 48 Kasaragod 30,338 1,204,078 2.5 49 Kannur 19,969 2,408,956 0.8 50 Kozhikode 5,940 2,879,131 0.2 51 Malappuram 12,267 3,625,471 0.3 52 Thrissur 4,826 2,974,232 0.2 53 Ernakulam 10,046 3,105,798 0.3 54 Kottayam 18,340 1,953,646 0.9 55 Alappuzha 3,131 2,109,160 0.1 56 Kollam 5,190 2,585,208 0.2 57 Thiruvananthapuram 20,893 3,234,356 0.6 58 Thiruvallur 37,858 2,754,756 1.4 59 Chennai 6,728 4,343,645 0.2 60 Kancheepuram 26,508 2,877,468 0.9 61 Viluppuram 63,920 2,960,373 2.2 62 Cuddalore 11,773 2,285,395 0.5 63 Nagapattinam 3,420 1,488,839 0.2 64 Thanjavur 3,641 2,216,138 0.2 65 Pudukkottai 792 1,459,601 0.1 66 Ramanathapuram 1,078 1,187,604 0.1 67 Thoothukkudi 3,494 1,572,273 0.2 68 Tirunelveli 8,358 2,723,988 0.3 69 Kanniyakumari 5,443 1,676,034 0.3 70 Pondicherry - 735,332 0 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 153 Sl No District Population Population Proportion of ST population (ST) Number to total population Number Total Per cent 71 Karaikal - 170,791 0 72 Andamans 2,904 314,084 0.9 73 Nicobars 26,565 42,068 63.1 Source: Census of India 2011 Under the Disclosure Policy, this Indigenous Peoples Planning Framework will be discussed with and disclosed to the key stakeholders. This framework cover the suggestions and recommendations received from different sections during its preparation. Further, this framework shall be disclosed to the public on the project web-site; and printed copies of the framework will be placed in government offices and other public locations for easy access by the tribal population. OP 4.10 requires that special planning measures be established to address particular issues concerning tribal people. More specifically, the policy requires the undertaking of a social assessment and free, prior and informed consultation process leading to the broad community support by tribal for the project, and the development of an instrument for indigenous peoples in the form of a Tribal Peoples Plan (TPP). 7.2 Process The IPPF requires the following: Action Responsibility Step 1: Information disclosure Borrower Prior to the ESIA, the project will disseminate project information to all stakeholders through various means, such as mass media, project brochures/posters and a dedicated project site on the internet. Step 2: Screening Bank Staff A screening will be conducted in order to determine if tribal families or communities are present or have collective attachment in the area of influence of the proposed projects. Where tribal communities are found to be present or have collective attachment in the area of influence of the project, it is to note that the OP 4.10 will be triggered and the following steps will be taken even if no negative impact is likely to occur. The identification of tribal families/communities will be as per OP 4.10. The determination as to whether a group is to be defined as indigenous peoples is made by reference to the presence (in varying degrees) of four identifying characteristics: ▪ Self-identification as members of a distinct indigenous cultural group and recognition of this identity by others; Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 154 ▪ Collective attachment to geographically distinct habitats or ancestral territories in the project area and to the natural resources in these habitats and territories; ▪ Customary cultural, economic, social, or political institutions that are separate from those of the dominant society and culture; and ▪ An indigenous language, often different from the official language of the country or region. Step 3: Social Assessment (SA) and Free, Prior and Informed Consultations Borrower If based on the screening, the Bank concludes that Indigenous Peoples are present in, or have collective attachment to, the project area, social assessment will be conducted to evaluate the project’s potential positive and adverse effects on the Indigenous Peoples, and to examine project alternatives where adverse effects may be significant. The social assessment will: • Identify key stakeholders of affected tribal community and establish an appropriate framework for their participation in the selection, design, implementation, and monitoring and evaluation of the relevant project activities; • Assess the demographic, socioeconomic, cultural and other relevant characteristics of affected ethnic on and near the project sites, establish social baseline and identify potential barriers to their full participation in benefiting from project activities; • Review relevant legal and institutional framework applicable to tribal community; • Assess, based on free, prior, and informed consultation with the affected tribal community, the potential impact of project activities and, where adverse impacts are identified, determine how they can be avoided, minimized, or substantially mitigated; • Propose specific measures to ensure that affected tribal people will, meaningfully and in a culturally appropriate manner, participate in project activities, benefit from the project, and mitigate and mitigate negative impacts; and • Develop institutional arrangements and implementation procedures to assist tribal farmers to voice grievances and have them addressed in ways that are socially sound, in line with the procedures described in this ESMF. • In case of any project which incorporates modernization/expansion or augmentation of any existing infrastructure which involved any displacement when constructed, the nature, scale and scope of displacement are to be assessed as part of the due diligence. The current state of the livelihood of the formerly displaced tribal population is also to be assessed. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 155 The breadth, depth, and type of analysis in the social assessment shall be proportional to the nature and scale of the proposed project’s potential effects on the tribal community, whether such effects are positive or adverse. Free Prior Informed Consultation and Participation: To ensure such consultation, it is necessary to: (a) establish an appropriate gender and intergenerationally inclusive framework that provides opportunities for consultation at each stage of project preparation and implementation among the affected tribal communities, any organization that works for the tribal community if any, and other local civil society organizations (CSOs) identified by the affected tribal communities; (b) use consultation methods appropriate to the social and cultural values of the affected tribal communities and their local conditions and, in designing these methods, gives special attention to the concerns of tribal women, youth, and children and their access to development opportunities and benefits; and (c) provide the affected tribal communities with all relevant information about the project (including an assessment of potential adverse effects of the project on the affected tribal communities) in a culturally appropriate manner at each stage of project preparation and implementation. The project before proceeding with the intervention will ensure that affected tribal communities provide their broad support to the project. Where there is such support, the project will prepare a detailed report that documents: (a) the findings of the social assessment; (b) the process of free, prior, and informed consultation with the affected tribal communities; (c) additional measures, including project design modification, that may be required to address adverse effects on the tribal and to provide them with culturally appropriate project benefits; (d) recommendations for free, prior, and informed consultation with and participation by tribal communities during project implementation, monitoring, and evaluation; and (e) any formal agreements reached with tribal communities. Mechanism for FPIC: When a project affects tribes, SPMU will carry out free, prior, and informed consultation with affected communities about the proposed project throughout the project cycle, taking into consideration the following: Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 156 (a) advanced notice will be given to the affected community along with project information that will include the scope of the proposed project; probable impacts (both positive and negative) in the local language. The date and timing of consultation will vary based on the availability of community members; (b) the consultation target audiences would be existing tribal organization or any CSO working for tribal community; tribal elders, community headmen, and tribal opinion makers, women, and youth. Consultations will be carried out in a public space that is accessible to all; (c) the consultation process will start once the sub project is identified and will be a continuous process to ensure that the tribal community fully understands the project and their concerns and recommendations are incorporated into the project design. The consultations may be repeated and will continue even during the construction stage; and (d) SPMU will maintain the record of the consultation process. Preparation of Subproject specific IPPs: If the screening of an individual Borrower subproject identified in the IPPF indicates that tribal communities are present in, or have collective attachment to, the area of the subproject, project will ensure that, before the subproject is implemented, a social assessment is carried out and an IPP is prepared in accordance with the requirements of this framework. Disclosure: The social assessment report and draft IPP will be made Borrower available to the affected tribal communities in an appropriate form, manner, and language. Post finalization of the IPP, the document is also made available to the affected tribal communities in the same manner as the earlier draft documents. 7.3 Entitlement Based on the Operational Policy 4.10 of the World Bank and as one of its significant R&R requirements; special provisions for the Scheduled Tribes (ST) has been made in the project R&R Policy (apart from the general compensation and assistance to be received as Project Affected Persons (PAPs) of proposed project activities for loss of assets. Apart from compensation at replacement value and R&R assistance for any adverse impact, each Tribal family will be entitled to additional benefits as a one-time grant. 7.4 R & R Benefits for Tribal Project Affected People The resettlement and rehabilitation (R&R) benefits for tribal families is as under: 1. Each Project Affected Family of ST category shall be given preference in allotment of land. 2. Tribal PAFs will be re-settled close to their natural habitat in a compact block so that they can retain their ethnic/linguistic and cultural identity Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 157 3. The Tribal Land alienated in violation of the laws and regulations in force on the subject would be treated as null and void and-the R&R benefits would be available only to the original tribal land owner. 7.5 Tribal Peoples Plans (TPP) On the basis of the ESIA and free, prior and informed consultation conducted as part of the process, a Tribal Peoples Plan (TPP) will be prepared for each intervention site wherever applicable. The PEA and the contractor, under the guidance of the SPMU, will provide necessary support so that all requirements under OP 4.10 would be addressed in TPP(s). One TPP(s) may bundle more than one project activity, depending on the proximities of sites, similarities in socioeconomic impact, timing of investment preparation and financing, and other relevant conditions. A TPP should include the following elements, as needed: ▪ The description of the project objective and activities, in particular on project activities that will be conducted for the site; ▪ A summary of the ESIA including the results of the free, prior, and informed consultation with affected tribal communities and verification of their broad community support for the project; ▪ Description of potential negative impacts and measures to address them; ▪ A framework to ensure that affected tribal communities can meaningfully participate in the project activities, and in the process to minimize and mitigate negative impacts. Where tribal communities are related to the resource or issue that the project is focusing on, an integrated framework will be developed that will ensure both tribal and other communities would collaborate in minimizing and mitigating negative impacts for common benefits. ▪ Mechanisms through which affected tribal communities are able to voice concerns and grievances and have them addressed; ▪ Mechanisms and benchmarks for monitoring, evaluating, and reporting on the implementation of TPP; and ▪ The financing plan for TPP implementation. 7.6 Suggested Format for TPP The suggested format for the TPP is as follows: i. Description of sub projects and implications for the indigenous community ii. Gender disaggregated data on the number of tribal households by impact category iii. Social, cultural and economic profile of affected households iv. Land tenure information v. Documentation of consultations with the community to ascertain their views about the project design and mitigation measures vi. Findings of need assessment of the community vii. Community development plan based on the results of need assessment viii. Modalities to ensure regular and meaningful consultation with the community ix. Institutional arrangement and linkage with other national or state level programmes x. Institutional mechanism for monitoring and evaluation of TPDP implementation and grievance redress Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 158 xi. Implementation Schedule and cost estimate for implementation 7.7 Key Elements of TPP and Participatory Approach The key elements in a TPP include: i. All development plans for tribal people should be based on full consideration of the options and approaches that best meet the interests of the communities. ii. Scope and impact will be assessed, and appropriate mitigation measures are identified iii. Project should consider the social and cultural context of affected peoples, and their skills and knowledge relating to local resource management iv. During project preparation, formation and strengthening of indigenous people’s organization; communication to facilitate their participation in project identification, planning, execution, and evaluation should be promoted. v. In case of the project doesn’t have the capacity of preparing and implementing TPP, experienced community organizations / NGOs can be involved as intermediaries. 7.8 Approval and Disclosure Once the draft TPP(s) and the associated ESIA Report(s) are drafted, they will be submitted to PMU for review and approval. PMU will translate them into relevant local languages, make them available on its website as well as in locations accessible to affected tribal communities, and consult them with affected tribal communities for comments. PMU will also disclose them on SPMU’s webpage, finalize them considering the comment received, and submit them to the Bank for review and clearance. The Bank will disclose the TPP(s) through the Info shop as well as at the country office website. 7.9 Implementation Arrangements The overall responsibility of the implementation of this IPPF rests with the PMU under the assistance of the Safeguard Coordinator/social expert in the SPMU. A competent person with a long experience in Bank safeguard policies will be hired as the Safeguard Coordinator wherever required who will ensure full compliance of all actions taken at the central as well as village level. Safeguard Coordinator will prepare the safeguard capacity development plan at the beginning of the project in which existing capacity gaps to implement this IPPF are identified and measures to fill the gaps will be presented. The safeguard capacity development plan will be shared with the Bank for review and comments. Safeguard Coordinator will implement the safeguard capacity development plan to train PEA staff, relevant line department officers who will work on the project, and all implementing contractor. Refresher training will be organized in the mid-term. At the village level, the PEA will assume the overall responsibility for the implementation of this IPPF. PEA will include a Safeguard Focal Point who will be responsible for safeguard related issues at the block level, in close coordination with the SPMU and under the supervision of the Safeguard Coordinator. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 159 7.10 Monitoring and Evaluation Throughout the implementation of the project, the Safeguard Coordinator will monitor the project compliance with Bank safeguard policies. The Safeguard Coordinator will visit at least on a monthly basis since the planning until 2 months after the completion of civil works the project sites and meet the affected tribal communities. Upon the completion of a TPP, the Safeguard Coordinator will carry out a TPP completion assessment to confirm that all measures under this TPP have been fully implemented and that the negative impacts on tribal communities have been adequately addressed. Monitoring group will be created in each tribal inhabited project area which will ensure that all actions would be undertaken in line with this IPPF and, in case of irregularities, contact the PEA or SPMU. The participatory Monitoring and Evaluation (M&E) will be conducted, under the facilitation of the Safeguard Coordinator, whereby affected people are encouraged and facilitated to report outstanding issues and air grievances. The meeting is attended by other SPMU members and village authorities. The minutes of the meeting will be prepared, and measures will be taken to address the recorded issues in the subsequent annual cycle. This record will be submitted to SPMU and NPMU. All concerned PEAs will have an IPPF focal point that will regularly supervise and monitor TPP implementation. These focal points will report to SPMU Director on IPPF related matters and request the support of the Safeguard Coordinator if needed. S/he will travel to the sites and spot check if the actions are taken and information provided in conformity with the IPPF. The project Management Information System (MIS) system will collect key data on IPPF such as the presence and absence of tribal community, the number of tribal population and their name of ethnicity, dates of consultation meetings conducted. The IPPF focal point will go to all project schemes at least on a monthly basis during and planning and implementation of civil works, prepare a back to office report upon return from the field and develop the quarterly progress report. The Back to office reports during the reporting period will be attached to the quarterly progress report, which will be shared with the Bank. The project webpage will have a dedicated section where such reports will be disclosed. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 160 CHAPTER 8. GENDER ACTION PLAN 8.1 Gender Equity Mainstreaming gender equity and empowerment is already a focus area in the project. In the sub projects, activities related to livelihood restoration will address women’s needs. A Gender Development Framework is being designed under the project as part of ESMF which will help in analysing gender issues during the preparation stage of sub project and design interventions. At the sub project level, gender analysis will be part of the social assessment and the analysis will be based on findings from gender specific queries during the primary data collection process and available secondary data. The quantitative and qualitative analysis will bring out sex disaggregated data and issues related to gender disparity, needs, constraints, and priorities; as well as understanding whether there is a potential for gender based inequitable risks, benefits and opportunities. Based on the analysis, the specific interventions will be designed and if required gender action plan will be prepared. The overall monitoring framework of the project will include sex disaggregated indicators and gender relevant indicators. The participation of beneficiaries and focus on poverty reduction are two other key determinants of the effectiveness and sustainability of any project. Any project must address the constraints on women’s participation in project design, construction, and monitoring and evaluation (M & E). The project must also focus on the linkage between gender and poverty, by identifying, for example, households headed by females and those households’ special needs. An adaptive, learning and process-oriented approach works better than a blue print approach; continuous dialogue between the project and the beneficiaries / PAPs is therefore important. Project beneficiaries are likely to have a stronger sense of ownership when the project gives them enough time, design flexibility, and authority to take corrective action. In this way, they find it easier to incorporate their earlier learning and negotiate with project staff and service providers. Therefore, a mechanism must be built into the project to allow such two- way interactions between the beneficiaries and the service providers. ENCORE emphasizes inclusive community development through a number of integrated interventions, especially taking into considerable the vulnerable coastal communities – sustaining by traditional means of utilizing coastal and marine resources. In order to make the project more inclusive and participatory, it is required that women associate themselves in different activities which they find feasible. This approach of inclusion and equity, specifically involvement and engagement of women will be helpful to attain social justice and reduce marginalization of women and empower them to avail maximum benefit from the project. Thus, incorporating gender and other social issues in the development projects helps to improve project performance and facilitate the achievement of the Bank’s goal of poverty reduction. A gender approach in the overall project framework takes care of key gender issues and brings in parity in association and participation of women and minimises the gap between males and females at the project level. A gender approach is also a way to comprehend the impacts on the women beneficiaries and ensures equality in project induced wellbeing. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 161 During the social assessment, consultations will be organised with different stakeholders to understand gender issues and possible measures that can help women in ensuring their participation in the overall process. The assessment helped to identify certain key issues pertaining to women and their involvement in different livelihood activities as well as other activities which will directly or indirectly impact their lives. 8.2 Policy Provision Directions in Constitution The constitution of India provides provisions to secure equality in general and gender equality in particular. Various articles in the Constitution safeguard women’s rights by putting them at par with men socially, politically and economically. The Preamble, the Fundamental Rights, Directive Principles of State Policies (DPSPs) and other constitutional provisions provide several general and special safeguards to secure women’s human rights. The Preamble to the Constitution of India assures justice, social, economic and political; equality of status and opportunity and dignity to the individual. Thus, it treats both men and women equal. The policy of women empowerment is well entrenched in the Fundamental Rights enshrined in our Constitution. For instance: 1. Article 14 ensures to women the right to equality; 2. Article 15(1) specifically prohibits discrimination on the basis of sex; 3. Article 15(3) empowers the State to take affirmative actions in favour of women; 4. Article 16 provides for equality of opportunity for all citizens in matters relating to employment or appointment to any office. These rights being fundamental rights are justifiable in court and the Government is obliged to follow the same. Directive principles of State Policy also contains important provisions regarding women empowerment, and it is the duty of the government to apply these principles while making laws or formulating any policy. Though these are not justifiable in the Court but these are essential for governance nonetheless. Some of them are: 1. Article 39 (a) provides that the State to direct its policy towards securing for men and women equally the right to an adequate means of livelihood. 2. Article 39 (d) mandates equal pay for equal work for both men and women. 3. Article 42 provides that the State to make provision for securing just and humane conditions of work and for maternity relief. Fundamental Duties Fundamental duties are enshrined in Part IV-A of the Constitution and are positive duties for the people of India to follow. It also contains a duty related to women’s rights. Article 51 (A) (e) expects from the citizen of the country to promote harmony and the spirit of common brotherhood amongst all the people of India and to renounce practices derogatory to the dignity of women. Other Constitutional Provisions Through the 73rd and 74th Constitutional Amendment of 1993, a very important political right has been given to women which is a landmark in the direction of women empowerment in India. With this amendment, women were given 33.33 percent reservation in seats at different levels of elections in local governance i.e. at Panchayat, Block and Municipality elections. Thus, it can be seen that these Constitutional provisions are very empowering for women and the State is duty bound to apply these principles in taking policy decisions as well as in enacting laws. Specific Laws for Women Some specific laws, which were enacted by the Parliament in order to fulfil the Constitutional obligation of women empowerment are; 1. The Equal Remuneration Act, 1976. 2. The Dowry Prohibition Act, 1961. 3. The Immoral Traffic (Prevention) Act, 1956. 4. The Maternity Benefit Act, 1961. 5. The Medical termination of Pregnancy Act, 1971. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 162 6. The Commission of Sati (Prevention) Act, 1987. 7. The Protection of Women from Domestic Violence Act, 2005 8. The Prohibition of Child Marriage Act, 2006. 9. The Pre-Conception & Pre-Natal Diagnostic Techniques (Regulation and Prevention of Misuse) Act, 1994. 10. The Sexual Harassment of Women at Work Place (Prevention, Protection and) Act, 2013. Above mentioned and several other laws are there which not only provide specific legal rights to women but also give them a sense of security and empowerment. International Commitments India is a part of various International conventions and treaties which are committed to secure equal rights of women. One of the most important among them is the Convention on Elimination of All Forms of Discrimination against Women (CEDAW), ratified by India in 1993. Other important International instruments for women empowerment are: The Mexico Plan of Action (1975), the Nairobi Forward Looking Strategies (1985), the Beijing Declaration as well as the Platform for Action (1995) and the Outcome Document adopted by the UNGA Session on Gender Equality and Development & Peace for the 21st century, titled “Further actions and initiatives to implement the Beijing Declaration and the Platform for Action”. All these have been whole-heartedly endorsed by India for appropriate follow up. National Policy for Woman In the year 2001, the Government of India launched a National Policy for Empowerment of Women which was revised in the year 2016. The National Policy for Women, 2016 (draft) having the vision of “A society in which, women attain their full potential and are able to participate as equal partners in all spheres of life and influence the process of social change”. The objectives of the policy are 1. Creating a conducive socio-cultural, economic and political environment to enable women enjoy de jure and de facto fundamental rights and realize their full potential; 2. Mainstreaming gender in all-round development processes/programmes/projects/ actions; 3. A holistic and life-cycle approach to women’s health for appropriate, affordable and quality health care; 4. Improving and incentivizing access of women/ girls to universal and quality education; 5. Increasing and incentivizing work force participation of women in the economy; 6. Equal participation in the social, political and economic spheres including the institutions of governance and decision making; 7. Transforming discriminatory societal attitudes, mindsets with community involvement and engagement of men and boys; 8. Developing a gender sensitive legal-judicial system; 9. Elimination of all forms of violence against women through strengthening of policies, legislations, programmes, institutions and community engagement; 10. Development and empowerment of women belonging to the vulnerable and marginalized groups; 11. Building and strengthening stakeholder participation and partnerships for women empowerment; 12. Strengthen monitoring, evaluation, audit and data systems to bridge gender gaps. World Bank’s Approach The World Bank’s approach to promoting gender equality makes all staff responsible for ensuring that the Bank’s work is responsive to the differing needs, constraints, and interests of males and females in client countries. Gender equality is now a core element of the Bank’s strategy to reduce poverty. There is a clear understanding that until women and men have equal capacities, opportunities and voice, the ambitious poverty-reduction agenda set out in the Sustainable Development Goals will be difficult to achieve. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 163 8.3 Issues of Significance Mainstreaming gender equity and empowerment is already a focus area in the project. In the sub projects, activities related to diversification of livelihood, improvement of basic services and protection of coastal and marine resources will address women’s needs. A Gender Development Framework will be designed under the project as part of ESMF which will help analyse gender issues during the DPR preparation stage of sub project and design interventions. At the sub project level, gender analysis will be part of the social assessment and the analysis will be based on findings from gender specific queries during the primary data collection process and available secondary data. The quantitative and qualitative analysis will bring out sex disaggregated data and issues related to gender disparity, needs, constraints, and priorities; as well as understanding whether there is a potential for gender based inequitable risks, benefits and opportunities. Based on the analysis, the specific interventions will be designed and if required gender action plan will be prepared. The overall monitoring framework of the project will include sex disaggregated indicators and gender relevant indicators. The participation of beneficiaries and focus on poverty reduction are two other key determinants of the effectiveness and sustainability of any project. Any project must address the constraints on women’s participation in project design, construction, and monitoring and evaluation (M & E). The project must also focus on the linkage between gender and poverty, by identifying, for example, relation between the household income and occupation of the women of the fisherman community. An adaptive, learning and process-oriented approach works better than a blue print approach; continuous dialogue between the PEAs through engaging the Gram Sabha in case of rural areas and local urban bodies in case of urban areas, and the beneficiaries / PAPs is therefore important. Project beneficiaries are likely to have a stronger sense of ownership when the project gives them enough time, design flexibility, and authority to take corrective action. In this way, they find it easier to incorporate their earlier learning and negotiate with project staff and service providers. Therefore, a mechanism must be built into the project to allow such reciprocal interactions between the beneficiaries and the service providers. Three major tools are used to identify and deal with gender issues in the project cycle: gender analysis, project design, and policy dialogue. 1. Gender analysis should be an integral part of the initial social assessment at the screening stage itself. The issues identified can be scaled up during the feasibility and detailed analysis can be carried out during the project preparation stage. 2. The project designs should be gender responsive based on gender analysis and should be included in the ESIA document. The findings and recommendations from the gender analysis during project planning and feedback from beneficiaries during implementation must be discussed thoroughly to determine the need for further action. 3. Consultations will be organised with different stakeholders to understand gender issues and possible measures that can help women in ensuring their participation in the overall process. The consultations helped to identify certain key issues pertaining to women and their involvement in the proposed interventions. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 164 Significant Gender Issues Since the interventions have not been finalized yet, all issues are yet to be identified. However, the following are the major common gender issues applicable to most of the interventions. 1. Lack of options of occupation for the women of the fisherman community. Absence of diversity of work other than helping with the catch at the landing sites affects the income of household especially for the small traditional fishing communities during the lean period. 2. Exclusion of women in fisheries related activities such as community mariculture 3. Low land holding of traditional dual farming and hence low production and insecure livelihood 4. Women earn less wage for the same duration of work, especially in informal/private sector; 5. Occupational health issues due to prolonged duration of engagement during small community based fisheries related activities or farming. 6. Drudgery of women in agricultural activities due to less usable agricultural equipment; 7. Limited access to technical equipment, capital, and training for developing alternative livelihood options 8. Few women holding productive resources such as land, animals, and machinery. 9. Negligible role of women in the decision-making process of the community for conservation of resources (such as mangroves or turtles) or disaster management. 10. Lack of proper solid waste or sewage management leading to serious health hazards 11. Active participation in community institutions is limited to a few women and large section either do not participate or remain passive; 12. Lack of awareness in coastal communities and poverty lead to a higher rate of school drop-outs and child marriage Gender Action Plan through the Project Cycle Three major tools are used to identify and deal with gender issues in the project cycle: gender analysis, project design, and policy dialogue. Gender analysis should be an integral part of the initial social assessment at the screening stage itself. The issues identified can be scaled up during the feasibility and detailed analysis can be carried out during the project preparation stage. The project designs should be gender responsive based on gender analysis and should be included in the ESIA document. The findings and recommendations from the gender analysis during project planning and feedback from beneficiaries during implementation must be discussed thoroughly to determine the need for further action. Listed below are the key action points: a) General Check list 1. Identify key gender and women’s participation issues. 2. Identify the role of gender in the project objectives. 3. Prepare terms of reference (TOR) for the gender specialist or social development specialist of the client 4. Conduct gender analysis as part of the overall Social Assessment. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 165 5. Draw up a socioeconomic profile of key stakeholder groups in the target population and disaggregate data by gender. 6. Examine gender differences in knowledge, attitudes, practices, roles, status, wellbeing, constraints, needs, and priorities, and the factors that affect those differences. 7. Assess men’s and women’s capacity to participate and the factors affecting that capacity. 8. Assess the potential gender-differentiated impact of the project and options to maximize benefits and minimize adverse effects. 9. Identify government agencies and nongovernmental organizations (NGOs), community-based organizations (CBOs), and women’s groups that can be used during project implementation. Assess their capacity. 10. Review the gender related policies and laws, as necessary. 11. Identify information gaps related to the above issues. 12. Involve men and women in project design. 13. Incorporate gender findings into the project design. 14. Ensure that gender concerns are addressed in the relevant sections (including project objectives, scope, poverty and social measures, cost estimates, institutional arrangements, social appendix, and consultant’s TOR for implementation and M & E support). 15. List out major gender actions. 16. Develop gender-disaggregated indicators and monitoring plan. b) Core Requirement for Mainstreaming Gender 1. All data should be disaggregated by gender, caste, ethnicity, location, and age 2. Issues of division of labour, access to resources and decision-making power (who is doing what, who has access to what, who makes the ultimate decision) have to be assessed for their gender differential impact on women and men of different social identity groups. 3. Assessment of policies, programs, institutional arrangements, human resources issues, and M&E system has to be done from a gender perspective of the project, project authorities and community groups. c) Steps of Gender Mainstreaming Three major tools will be used to identify and deal with gender issues in the project cycle: initial gender assessment, gender action plan, and policy note. The initial gender assessment should be an integral part of the initial social assessment at the screening stage. The issues identified can be scaled up during the feasibility study and detailed analysis can be carried out during the detailed project report stage. The project design should be gender responsive based on gender analysis and should be included in the detailed project report in the form of a gender action plan. The findings and recommendations from the gender analysis during project planning and feedback from beneficiaries during implementation must be discussed thoroughly to determine the need for further action. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 166 Focus of Intervention Inputs and Process Indicators Data Source Policy checklist i. What are the requirements of the national gender Contract documents; equality policy, if any, and the executive support ministry of new and provided to it? renewable energy; the ii. Which ministry focal point or unit is responsible for Ministry of Women advocacy and gender inclusion at the policy and project and Child level? Development; SPPD iii. Does the Energy sector strategy address gender issues (labor issues, e.g. promotion of gender in labor-based work, participation of women in prioritization and design of works, measures to eliminate discriminatory labor or contracting practices, HIV/AIDS prevention and treatment) in its works and contracts? iv. Do policies for renewable energy projects and planning procedures explicitly take gender into account: identification of gender gaps and gender-specific needs, capacities, constraints, and opportunities inclusion of socioeconomic empowerment as an integral element? v. Are women and men civil society stakeholders consulted on policies and programs; included in teams analyzing policy and strategy; included in decision making? vi. Is there a system for monitoring the implementation of gender and other components of sector policies and strategies? vii. Sex disaggregation of beneficiary data and key gender indicators outreach and capacity building on gender and other social dimensions grants for addressing gender issues? viii. Are there training sessions on gender including gender- sensitive planning? ix. Is stakeholder consultation facilitated? x. Is there participation in implementing agencies or community organizations? xi. Are gender sensitization workshops held for men and women of power ministry/department staff and implementing agencies, and do they consider knowledge gaps in gender elements in the sector? xii. How many women are represented on gender boards and in works prioritization and decision-making forums related to the planning, implementation, monitoring, and evaluation of projects? Project cycle: Project i. Conduct a rapid assessment to identify and quantify Stakeholder and identification, potential gender-related issues and impacts affecting beneficiary preparation, and design access, risks, benefits, and participation assessments: user ii. Identify disadvantaged or vulnerable groups, including satisfaction survey, who they are, where they live, and their socioeconomic project concept note, characteristics (scheduled castes, women-headed social assessments households, widows, disabled) (household surveys iii. Examine the impacts of the project on these groups and focus group iv. Identify the gender-specific implications of land discussions in project acquisition and resettlement influence area), mid- v. Identify gender-specific implications of employment term and end term opportunities to be created under the project evaluation surveys Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 167 Focus of Intervention Inputs and Process Indicators Data Source vi. Identify gender-specific constraints in receiving information and providing feedback and complaints on the project vii. Discuss identified gender and other social issues in the project viii. Include both females and males affected by the project in stakeholder consultations ix. Use separate focus groups to enable women to voice their views separately from men x. Analyze the data collected to highlight gender differences in uses and the underlying causes of women’s and men’s project related problems xi. Examine relevant inter-sectoral linkages, such as access to health services, HIV/AIDS prevention, and access to markets and schools xii. Ensure that analysis of gender differences in needs, use, constraints, and access are included in the terms of reference for the social assessment xiii. Identify the gender-related issues that need to be addressed to ensure the effectiveness and sustainability of the project xiv. Develop approaches for addressing the gender-related issues identified and creating opportunities for equal access to project benefits for men and women, including training, organizational capacity building, grants programs, targets for women’s participation xv. Develop indicators for measuring progress on gender- related issues within the relevant project components (e.g. construction works, institutional arrangements, land acquisition, and resettlement benefits, privatization, livelihood restoration, awareness building, consultations, complaint handling) Project cycle: i. Desk review (secondary literature) Other projects in the Methodology ii. Review available information (e.g. statistics, gender country/state and analysis, documents of previous solar projects, if gender policy available or other projects involving acquisition for documents, household non-linear projects) in the project area and the surveys, national socioeconomic profile of the target population sample survey, latest iii. Review the relevant legal framework (e.g. inheritance census data, law), policy framework (e.g. resettlement and participatory rapid rehabilitation), and institutional framework (e.g. current appraisal of target administrative system for land acquisition, area, focus group compensation disbursement, grievance handling, discussions, awareness creation) and their gender implications consultations with iv. Review government programs for encouraging equal beneficiaries opportunities and participation of women in the project influence area v. Household surveys (primary survey) vi. Draw up gender-disaggregated socioeconomic and cultural profiles and identify the problems faced by and needs of the target population vii. Conduct group discussions, random interviews, and transect walks to study the activity pattern viii. Collect quantitative information Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 168 Focus of Intervention Inputs and Process Indicators Data Source ix. Participatory methodologies (e.g. participatory rapid appraisal) x. Collect qualitative information that cannot be collected through surveys (socio cultural norms, behavioral questions) xi. Define ways in which men and women beneficiaries and other stakeholders, especially poor women, can equally participate in the project xii. Map out the target areas and assess which are the most disadvantaged areas and sections of society (widows, female-headed households, disabled men and women) in terms of access to services and poverty level xiii. Identify major stakeholder groups and their positions xiv. Staffing xv. Ensure adequate gender balance in field teams xvi. Select field team members with gender awareness, local knowledge, cultural understanding, and willingness to listen Project cycle: Data i. Socioeconomic profile: Gender-disaggregated data District, block, and collection ii. Demographic: Gender, sex ratio, caste, marriageable village census data, age, female-headed households, migration trend, national sample household size survey data, health iii. Economic: Income level and source, expenditure survey data, pattern and decision making, access to land and household surveys, resources focus group iv. Health: Population growth rate, infant and adult discussions, mortality rate, availability of medical facility, behavioral surveys, reproduction-related decision making, HIV/AIDS observation awareness v. Education: Literacy, school enrolment and dropout ratio, child labor vi. Status of women: Political representation and awareness, socio cultural perceptions and practices of men and women, domestic violence, trafficking, gender-discriminatory policies and laws, gender roles, responsibilities and gender division of labor in productive areas (e.g. agriculture, income-generating activities) and reproductive areas (e.g. household chores, child care), and time allocation for each responsibility vii. Fuel, fodder, water, and sanitation viii. Availability, quantity, and quality of fuel and fodder, who collects fuel, fodder, and water for the family, sources of drinking and agricultural water, how men and women store and use water collected, dry season management, how far away these resources are located, time spent on collection of the resources, mode of transport used to collect the resources, availability of sanitation service (chargeable or not, who runs it) ix. Access, control, constraints x. How men and women differ in their access to and control of land, agricultural inputs, extension, markets, employment opportunities, and credit xi. Whether external assistance is provided to improve access and control, and by whom Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 169 Focus of Intervention Inputs and Process Indicators Data Source xii. Participation xiii. Factors affecting the level of participation of men vs. women, incentives and constraints, means of information dissemination about the project preferred by men vs. women, labor demand for men vs. women, which modes of participation men and women favor (e.g. decision making in planning, cash contribution, labor contribution for construction, training, financial management, organizational management) xiv. Perception of benefits and impacts xv. Men’s and women’s perceptions of positive and negative impacts of the project, how negative effects can be mitigated Project i. Prepare a gender action plan. Under this: Gender expertise, implementation: ii. Undertake quality social and gender analyses. Identify Discussion, and Gender action plan constraints to participating and benefiting men and participation with women; develop strategies for each component to beneficiaries, separate ensure that men and women participate and benefit focus group equally discussions with men iii. Revisit gender design strategies at inception to develop and women, a detailed gender action plan. The plan needs to be government tested and reviewed early in implementation; identify departments, labor detailed activities, targets, resources, and and employment laws, responsibilities for implementation provisions in project iv. Citizen Engagement Framework: The gender action and budget, learning plan must be fully owned and understood by the approaches from good executing agency. Use a participatory and flexible practice cases approach to developing the plan; a strong rationale that is directly linked to overall project objectives is needed for targeting and working with women v. Identify realistic targets linked to loan objectives. Targets and strategies should enable step-by-step progress, bringing incremental changes and challenging culture without threatening it; linking targets to loan objectives helps all stakeholders to understand the rationale for focusing on women and helps monitoring of participation and benefits. vi. Include gender capacity building in the gender action plan. Both formal training and ongoing support and mentoring are needed for developing skills, ownership, and commitment. vii. Provide adequate skills and resources for the implementation of the gender action plan. Long-term gender specialists in the executing agency or project team and adequate resources for implementation of actions; nongovernmental organizations and other agencies contracted to implement project activities should have a demonstrated gender capacity. viii. Monitor and follow up gender-related targets and activities. Systematic follow-up to ensure that policy reforms and gender actions are implemented; routine monitoring and reporting; gender-sensitive indicators and gender-related risks must be included in project logical frameworks. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 170 Focus of Intervention Inputs and Process Indicators Data Source Project i. Develop a participation strategy for men and women Gender expertise, implementation: during project implementation and monitoring and Discussion, and Participation strategy evaluation: participation with ii. Avoid overly high expectation of women’s participation beneficiaries, separate and develop a practical schedule for participation focus group iii. Planning. Conduct women-specific consultation to take discussions with men their views and suggestions on the design. Any and women, mechanism established during the project design, such government as grievance mechanisms, should have adequate departments, labor representation of women and employment laws, iv. Construction. Ensure work conditions that are provisions in project conducive to women’s participation (e.g. gender-equal and budget, learning wage rates, construction season, toilet and child care approaches from good facilities) practice cases v. Training options. Identify ways to link up with income generation, literacy, and other activities to support an integrated approach to poverty reduction and women’s empowerment vi. Staffing, scheduling, procurement, and budgeting. Hire female project staff vii. Consider seasonal labor demand in scheduling civil works viii. If appropriate, set a minimum percentage of female labourers and prohibit the use of child labourers in the civil works contract ix. Ensure adequate and flexible budgeting to allow a learning approach (e.g. training budget, consulting service budget for women’s organizations) Project cycle: Impact i. Establish whether men and women perceive positive Project monitoring and negative impacts of the project differently, and reports, audits, group assess how the negative effects can be mitigated discussions, ii. Consider whether the benefits are likely to be household survey, distributed equitably land tenure details iii. For disadvantaged or vulnerable groups, find out who they are, where they live, what are their socioeconomic characteristics (scheduled castes, women-headed households, widows, disabled), and how the project will affect them iv. Assess the gender-specific implications of the following: • land acquisition and resettlement: extent of land being acquired • utility relocation: what and where • tree cutting: how many and local dependence • diversion of forest land: how much and local dependence Monitoring and i. Develop a feedback mechanism in which both males Focus group Evaluation: Feedback and females have a voice discussions, project mechanism ii. Disaggregate all relevant indicators by gender, such as monitoring reports the number of women gaining access to credit, increase in women’s income, and career prospects for project- trained women Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 171 Focus of Intervention Inputs and Process Indicators Data Source iii. Integrate sex-disaggregated beneficiary data and relevant measures of gender equality into the baselines and other routine monitoring and evaluation processes iv. Measure the impacts of the project components on women and men v. Assess the value added by women’s participation in the project Monitoring and i. Develop gender-informed results indicators for Review of gender- Evaluation: Gender- monitoring. These include: informed results informed indicators ii. Increased income, employment, and entrepreneurship. indicators Number of women and men employed in the sector, number of women and men employed in solar power project; increased women’s and men’s income from produce marketed using project services. iii. Time saving and increased productivity. Reduced women’s and men’s time for domestic work (collection of water, fuel wood, food crop collection, fodder, etc.); increased productive time used for economic activities. iv. Improved affordability. Percentage increase of income among women and men; increased participation in decision making; number of women and men participating in community decision meetings; reduced incidence of harassment, crime, and human trafficking; increased awareness of HIV/AIDS transmission and prevention; number of women and men leading committees; number of women and men managers in agencies; women control their income and establish bank accounts in their names; increased recognition of women’s contributions to the household and community 8.4 Key Activities in Project Cycle The involvement of women groups in the identification of impacts and opportunities through project activities shall form the basis for the preparation of gender sensitive project activities. The procedure to be followed and process and outcome are presented in the following matrix. Table 8.1: Opportunities for Involvement of Women during Project stages Project Stages Key Activities Responsibility Planning Stage • Identify gender concerns/issues related to the project with Social Development due consultation with women group Specialist, PEAs, • Organize women stakeholders’ meetings to inform about Gram Panchayats/ the project activities, its benefits and key expectations Urban Local Bodies, from the project. SPMU, NPMU • Sensitize and discuss the project and its components. • Sensitize other stakeholders on gender concerns/issues; • Identify key areas of constraints that may be improved through the project; • Prepare project component wise activity plan where women can be engaged in different project activities. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 172 Project Stages Key Activities Responsibility Implementation • Implementation of provisions of project activity specific Social Development Stage plan addressing gender concerns as per the GAP; Specialist, PEAs, • Monitoring engagement of women in different project SPMU, External activities, skilled and unskilled works; M&E Agency • Monitor safety and security measures of women in work and camp sites; • Monitor women specific provisions and facilities created in the project site and camps. • Supervising adherence to wage payment norms Post- • Continuation of activities initiated under the project; Social Development Implementation • Monitoring sustenance of project inputs and its benefits Specialist, SPMU Stage accessed by women 8.5 Monitoring Gender Action Plan The indicators, frequency, and agency recommended for monitoring are presented in Table 8.2. Table 8.2: Monitoring Indicators for Gender Action Plan Aspects Monitoring Indicators (Process and Frequency Monitoring Outcome) Responsibility Economic • No. of women engaged in different activities • Planning Stage: for the DPMU and their proportion to the total workforce; base line data • Days of engagement of women in different • Half yearly Monitoring Third party wage / non-wage activities and proportional • Mid Term Review Monitor along days of engagement in comparison to their (MTR) with PMU male counterpart; • Final Impact • Growth in income of women due to such Assessment engagements; • Reduction in no. of days of migration (if migrating earlier); • No. of women having additional/new market oriented employable skills for self- engagement; • No. of women accessed different govt. schemes/provisions including beneficial enrolment in agricultural interventions; • Improvement in asset holding of women (productive and household assets). Social • Improvement of association of women in local • Planning Stage: for the DPMU institutional and decision-making process base line data (membership, management position, etc.); • Half yearly Monitoring Third party • Mid Term Review Monitor along (MTR) with PMU • Final Impact Assessment Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 173 8.6 Implementation Arrangements The preparation, implementation, and monitoring of the Gender Action Plan (GAP) is the responsibility of the project implementing entities. The Social Development specialist, at the PMU level, will facilitate and supervise this process of preparation and implementation of the Action Plan. All efforts will be made to coordinate and work with associated line departments and other department, more specifically the Women and Child Development department, State Livelihood Mission, Panchayati Raj, and Rural Development department to help dovetailing with their development programs for the socio-economic development of women. 8.7 Framework for citizen engagement Unlike traditional types of engagement – Communication and Consultation, Citizen Engagement is an interactive two-way process that encourages participation, exchange of ideas and flow of conversation. It reflects the willingness to share information and make citizens a partner in decision making. Active engagement gives the right to hold others accountable, and accountability is the process of engaging in participation. It seeks greater accountability from the service providers through increased dialogue, consultation and monitoring and assessing performance externally and mutually. Ways of Citizen Engagement: A variety of mechanisms may be adopted to incorporate and promote citizen engagement in Projects. a) Information sharing: In order to generate awareness and to prepare the citizens, elected representatives and other stakeholders, a wide range of information should disseminate. It includes display of Citizen’s Charter with listing services and service levels, roles and responsibilities of officials and escalation mechanism, etc. In addition, regular meetings and interfaces may also be used to share information. For many departments and services, mobile based voice or text services and web-based presence also serves as an additional channel for information sharing. b) Consultation: Consultative meetings with the stakeholders are to be undertaken at different stages of the project cycle at regular intervals. Each intervention should be discussed with the citizens, elected representatives, local civil society groups and other stakeholders to get their perspectives included in the designing of the interventions, and thereby increasing the chances of ownership among various stakeholders. Such consultations may be undertaken both online as well as face to face. c) Joint assessment: Participatory assessment and monitoring with the stakeholders, particularly the identified service seekers, are used as tools for enhancing citizen engagement. These include the use of a variety of techniques such as joint citizen monitoring, meetings with the elected representatives, etc. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 174 CHAPTER 9. LABOUR MANAGEMENT FRAMEWORK 9.1 Labour influx ENCORE Program comprises a number of interventions that involve construction works such as construction of coastal protection structures, augmentation of infrastructure, construction activities related to community-based livelihood activities including ecotourism among the many. Moreover, other interventions such as plantation of mangrove and bio-shield and beach cleaning may also require additional workforce. This project will also help in escalating the development activities around the project site which will demand a constant supply of labour for many sectors. The influx of workforce will put additional pressure on existing resources. The workforce normally consists of solitary migrant males and that can be a potential risk for the host population. However, in many cases, the migrant male member of the family might relocate his family with him. Specifically, the influx of labour force can lead to: ▪ Risk of conflict and social unrest due to cultural differences between the labour force and local community ▪ Risk of spread of communicable diseases due to interaction of the labour and the local community ▪ Risk of gender-based violence ▪ Risk of violation of child-safety measures ▪ Health hazard for host community due to lack of sanitation facilities and waste management ▪ Additional pressure on the local resources and social infrastructures 9.2 Construction Labour Management Plan It is envisaged that during construction phase of the project of the different interventions in the States and UTs, labourers will be hired. Since the construction activities are mostly labour intensive by nature, therefore, it is also envisaged that many of the labourers will be employed from outside the particular State or UT and will, therefore, be migrant labourers and hence, accommodation will be provided. These migrant labourers will be accommodated in a temporary campsite within the project area. 9.2.1 Objectives The influx of migrant labour will have both negative and positive impacts on the nearby community and local environment. The labour will be accommodated in a temporary campsite within the project area which can have a significant interface with the nearby community. However, the influx of migrant workers would lead to a transient increase of population in the immediate vicinity of the project area for a limited time. This would put pressure on the local resources such as roads, fuel for cooking, water, etc. Hence, a plan has been designed to demonstrate the: ▪ Potential impacts associated with influx on the host population and receiving environment are minimized; Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 175 ▪ Provision of safe and healthy working conditions, and a comfortable environment for migrant labour; and ▪ To ensure compliance with the national labour laws. 9.2.2 General Requirements All migrant workers are envisaged to be accommodated in a proper temporary campsite within the project area or as guided by the Engineer / ESIA. If migrant workers are accompanied by their families, provisions should be made accordingly. As per the National Acts, the inclusion of requirements for labour camp to be established by contractors during construction phase of the project. Contractor(s) shall ensure implementation of the following measures to minimise the potential negative impacts of worker accommodation and workers on local communities: ▪ Cleanliness: Pest extermination, vector control, and disinfection are to be carried out throughout the living facilities in compliance with local requirements and/or good practice. ▪ Complaints and incident reporting: A formal Complaints Procedure will be implemented to ensure timely and transparent response to complaints as received from labour. ▪ Labour education: The workforce will be sensitized to local social and cultural practices through the provision of an induction course for all employees that stipulates expected behaviour; ▪ Labour behaviour in the campsite provided: A Code of Behaviour governing appropriate behaviour in the accommodation facilities to be kept in place and to be strictly enforced. The contractor shall ensure implementation of the “rules of engagement” between labourers living in campsite and community and shall be implemented by construction contractors for all engaged labourers. ▪ Labour Compensation and Accommodation: The client shall ensure that labourers are provided with benefits such as annual leave, weekly rest day, etc. Accommodation to be provided for the construction labour which covers facilities (including catering facilities, dining areas, washing and laundry facilities, etc.) and supporting utilities. 9.2.3 Hiring and Recruitment Procedure The manpower contractor shall, wherever possible, locally recruit the available workforce and shall provide appropriate and requisite on job and EHS training as necessary. The following general measures shall be considered for the workforce during their employment tenure: ▪ The concerned PEA in consultation with the SPMU should include a code of conduct relating to the accommodation to be signed with the contract Document of contractors. ▪ The contractor shall not employ any person below the age of 18 years nor will have any forced labour; ▪ The construction labourers will be provided with documented information regarding their rights under national labour and employment law such as but not limited to Factories Act, Minimum Wages Act, Trade Unions Act, and Workmen’s Compensation Act; ▪ First priority for employment of labour should be given those impacted by the project such as landowners who have lost land; Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 176 ▪ No discrimination shall be done by the construction contractor with respect to recruitment and hiring, compensation (including wages and benefits), working conditions and terms of employment, access to training, job assignment, termination of employment or retirement, and disciplinary practices; ▪ The contractor to ensure that work hours are set at eight hours a day, 48 hours a week, with a weekly rest day for all engaged labour; ▪ Every labour is entitled to a maximum of only two hours a day as Overtime (OT) work. OT pay is twice the hourly remuneration; ▪ The borrower country though the NPMU and SPMU shall ensure equal wages for male and female workers for work of equal nature or value is maintained; ▪ A grievance redress mechanism for workers shall be put in place by the contractor to raise workplace concerns. The workers will be informed about the grievance mechanism at the time of recruitment; and ▪ The Contractor shall ensure that they develop and implement a procedure to review the performance of their sub-contractors. ▪ The procedure developed should include regular inspection of the camp sites, maintaining information pertaining to labour sourced by sub-contractors; 9.2.4 Worker’s Accommodation The Contractor will supervise and monitor the activities performed by their contractor and accommodation facilities provided in the campsite. The following measures shall be provided: ▪ The labour will be provided with accommodation on twin sharing basis made of insulating material and locally available building material, etc.; ▪ The migrant workers with families shall be provided with individual accommodation comprising bedroom, sanitary and cooking facilities; ▪ The units will be supported by common latrines and bathing facilities duly segregated for male and female labour; ▪ Adequate number of toilets shall be provided in the accommodation facilities. A minimum of 1 unit to 15 males and 1 unit for 10 females shall be provided; ▪ The contractor shall provide a canteen facility for the construction workers and the food will be of appropriate nutritional value and will consider religious/cultural backgrounds; ▪ All doors and windows shall be lockable and mobile partitions/curtains shall be provided for privacy; ▪ Facilities for the storage of personal belongings for workers shall be provided within the campsite only; ▪ Dustbins shall be provided for collection of garbage and will be removed on a daily basis; ▪ It is also required to provide first aid box in adequate numbers; and ▪ Ventilation should be appropriate for the climatic conditions and provide workers with a comfortable and healthy environment to rest and spend their spare time. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 177 9.2.5 Security The contractors shall put in place the following security measures to ensure the safety of the workers. The following measures shall be incorporated: ▪ Access to the campsite shall be limited to the residing workforce; ▪ The contractor shall be responsible for deploying an adequate number of guards; ▪ Adequate, day-time night-time lighting shall be provided; ▪ The security personnel shall be provided with training to respect the community traditions and in dealing with, use of force, etc.; and ▪ The rental accommodation shall be provided with firefighting equipment and portable fire extinguishers. 9.2.6 Provisions for Drinking Water Access to an adequate and convenient supply of free potable water is a necessity for workers. The domestic water supply shall be made available by the contractor. ▪ Safe drinking water conforming to the IS 10500:2012 for drinking water shall be provided; ▪ Private tanks can be utilized for provision of drinking water for the migrant labours; ▪ The direct usage of water from bore well should not be allowed and water shall be adequately treated; ▪ The Contractor(s) should regularly monitor the quality of drinking water available. In case of non-compliance with the Drinking Water Specifications, additional treatment shall be provided, or alternative sources of water supply shall be arranged; and ▪ All tanks used for the storage of drinking water are constructed and covered to prevent water stored therein from becoming polluted or contaminated. 9.2.7 Cooking Arrangements The construction phase will involve the engagement of a large number of migrant people in the project area for a limited time. Hence, there shall be a requirement of the provision of cooking facilities (kitchen) as listed below: ▪ Places for food preparation are designed to permit good food hygiene practices, including protection against contamination between and during food preparation; ▪ Adequate personal hygiene including a sufficient number of washbasins designated for cleaning hands with clean, running water; and ▪ All kitchen floors, ceiling and wall surfaces adjacent to or above food preparation and cooking areas are built using durable, non-absorbent, easily cleanable, non-toxic materials; ▪ Food preparation tables are equipped with a smooth, durable, easily cleanable, non- corrosive surface made of non-toxic materials. To ensure that the fuel need of labourers in the project area does not interfere with the local requirements, necessary arrangements for supply of fuel to the labourers shall be done by the contractor. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 178 9.2.8 Wastewater Generation There will of generation of wastewater from the campsite. About 80% of water used shall be generated as sewage/wastewater. Contractors shall ensure that the campsite is equipped with the septic tank and soak pit for disposal of sewage. It is also recommended that the storm water and sewage system should be separate. The surface water drainage shall include all necessary gutters, down pipes, gullies, traps, catch pits, manholes, etc. Sanitary and toilet facilities are constructed of materials that are easily cleanable. Sanitary and toilet facilities are required to be cleaned frequently and kept in working condition. 9.2.9 Solid Waste Management The municipal solid waste generated from the campsite will mostly comprise compostable wastes like vegetable matters (kitchen waste) and combustible waste like paper, cans, plastic and some non-degradable waste like glass/glass bottles. Improper disposal of solid waste will lead to environmental degradation and health hazards to labour as well as the nearby communities. The following measures shall be adopted by contractors for ensuring effective management of solid waste: ▪ The solid wastes of domestic nature generated shall be collected and stored separately in appropriate containers with proper sealing on them; ▪ Separate bins with proper markings in terms of recyclable or non-recyclable waste shall be provided in the houses and kitchen premises in sufficient numbers for collection of garbage; ▪ Food waste and other refuse are to be adequately deposited in sealable containers and removed from the kitchen frequently to avoid accumulation; and ▪ The contractor shall identify the nearest municipal solid waste storage facility and tie up with the concerned urban local body for disposal of waste at frequent intervals. 9.2.10 Medical Facilities Effective health management is necessary for preventing the spread of communicable diseases among labour and within the adjoining community. The following medical facilities shall be provided by contractors for the construction workers: ▪ A first aid centre shall be provided for the labour within the construction site equipped with medicines and other basic facilities; ▪ Adequate first aid kits shall be provided in the campsite in an accessible place. The kit shall contain all type of medicines and dressing material; ▪ Contractor shall identify and train an adequate number of workers to provide first aid during medical emergencies; ▪ Regular health check-ups shall be carried out for the construction labourers every six month and health records shall be maintained; ▪ Labours should have easy access to medical facilities and first aider; where possible, nurses should be available for female workers; Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 179 ▪ First aid kits are adequately stocked. Where possible a 24/7 first aid service/facility is available. ▪ An adequate number of staff/workers is trained to provide first aid; and ▪ Information and awareness of communicable diseases, AIDS, etc. shall be provided to workers. 9.2.11 Recreation Facilities ▪ Basic collective social/rest spaces are provided to workers. ▪ Facilities like a common television can be provided in labour camps 9.2.12 Inspection of Accommodation Facilities The campsite shall be inspected at frequent intervals to ensure that the facilities are well organized and maintained to acceptable and appropriate standards by the Contractor. The key areas are: ▪ Daily sweeping of rooms and houses shall be undertaken; ▪ Regular cleaning of sanitary facilities shall be undertaken; ▪ The kitchen and canteen premises shall be established under good hygiene conditions; ▪ Daily meal times shall be fixed for the labour; ▪ Smoking and alcohol consumption shall be prohibited in the workplace; ▪ Water logging shall be prevented at areas near the accommodation facilities and adequate drainage is to be provided; and ▪ Checklists pertaining to the daily housekeeping schedule shall be maintained and displayed at houses, toilets, and kitchen. To limit the impact due to cumulative labour onsite during the construction phase, contractors shall provide adequate labour camp which should be appropriate for its location and be clean, safe and, at a minimum, meet the basic needs of workers. ▪ Contractors should assess the location of labour camp, that it should not be constructed in the immediate vicinity of any drainage channel; ▪ It should be ensured that the labour camp(onsite)should have basic amenities such as electricity, drinking water, health& sanitation facility, kitchen and rest room; ▪ All tanks used for the storage of drinking water are constructed and covered as to prevent water stored therein from becoming polluted or contaminated and all the migrant workers will be instructed accordingly; ▪ Employers should ensure that accommodation which is provided is not overcrowded and does not pose a risk to the health and safety of workers; ▪ The labour camp will be equipped with sceptic tanks and soak pits and avoid the presence of stagnant water is a factor of the proliferation of potential disease vectors such as mosquitoes; ▪ Contractors should ensure that the disruption of local communities is minimum, in particular, local communities’ transport infrastructures and if required limit the worker's movements in nearby areas; Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 180 ▪ Security staff have a clear mandate and have received clear instruction about their duties and responsibilities, in particular, their duties not to harass, intimidate, discipline or discriminate against workers; ▪ Contractors should ensure that workers and members of the surrounding communities have specific means to raise concerns about security arrangement and staff; ▪ Where possible, an adequate transport system to surrounding communities will be provided. It is good practice to provide workers with free transportation to and from local communities Specifically: ▪ The contractor and labourers will sign a code of conduct by contractors and workers to maintain good manners with the community and avoid gender based violence; ▪ Project will undertake awareness raising program for the workers and community on the risk of labour influx; and ▪ To the extent possible, the local workforce will be engaged to minimize the influx of workers 9.2.14 Influx of migrant labourer’s additional pressure on the local resources and social infrastructures And Risk of social conflict • The contractor will preferably engage the local labour force except for the laborer’s requiring special skills and the non-availability of such skilled laborers from the local area. • Awareness raising of laborers/ workers on societal norms, taboos, and other cultural practices • Organise awareness creation and educational programmes for all workers and the general public on the behavioral changes required to prevent the spread of HIV/AIDS and other STDs • The ‘Labour Influx and Construction Workers Campsite Management Plan’ will be implemented • Project to assess and manage labour influx risk based on risks identified in the ESIA. Depending on the risk factors and their level, appropriate site-specific Labour Influx Management Plan and/or a Workers’ Camp Management Plan. • The project will incorporate the ESMP into the civil works contract. The responsibilities for managing these adverse impacts will be clearly reflected as a contractual obligation, with a mechanism for addressing non-compliance. • Employment of any person under 18 years of age will be strictly prohibited. The contractor will maintain a labour register with name, age, and sex with supporting document (preferably copy of Aadhar card or voter’s ID card). This will be monitored by the Environmental and Social office of contractors. • Contractor and labourer will sign a code of conduct to maintain good manners with the community and avoid GBV • Project will undertake awareness raising program for the workers and community on the risk of labour influx Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 181 Avoiding Gender Based Violence • Contractor will prepare and implement robust measures to address the risk of gender-based violence that include - mandatory and repeated training and awareness raising for the workforce about refraining from unacceptable conduct toward local community members, specifically women; - informing workers about national laws that make sexual harassment and gender-based violence a punishable offence which is prosecuted; - introducing a Worker Code of Conduct as part of the employment contract and including sanctions for non-compliance (e.g., termination), and (iv) contractors adopting a policy to cooperate with law enforcement agencies in investigating complaints about gender-based violence. • Additional measures can aim to reduce incentives to engage with the local community by providing workers with the opportunity to spend their time off away from the host community, where feasible with a small transport allowance, ideally allowing workers to regularly return for brief visits to their families, spouses, and friends, or to visit nearby urban centers that provide a variety of legal social opportunities. For workers who need to travel further it may be attractive to forego weekends off in exchange for longer breaks that would allow for such home leave travel 9.3 Contractor’s responsibility Within 30 days from the appointed date, the Contractor shall prepare and submit 4 hard copies and 1 soft copy of Labour Influx and Worker’s Camp Management Plan to the concerned PEA that addresses specific activities that will be undertaken to minimize the impact on the local community, including elements such as worker codes of conduct, training programs on HIV/AIDS, etc. A Workers’ Camp Management Plan addresses specific aspects of the establishment and operation of workers’ camps. This Labour Influx and Worker’s Camp Management Plan will include: (i) mandatory and repeated training and awareness raising for the workforce about refraining from unacceptable conduct toward local community members, specifically women; (ii) informing workers about national laws that make sexual harassment and gender-based violence a punishable offence which is prosecuted; (iii) introducing a Worker Code of Conduct as part of the employment contract and including sanctions for non-compliance (e.g., termination), manual scavenging, engagement with local residents, child labour, non-discrimination, harassment of co-workers including women and those belonging to SC and STs and other minority social groups, (iv) contractors adopting a policy to cooperate with law enforcement agencies in investigating complaints about gender-based violence. (v) training programs on HIV/AIDS and other communicable diseases, (vi) workers’ Camp Management Plan addressing specific aspects of the establishment and operation of workers’ camps provided the Local Body/ Executing Agency is unable to Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 182 cater to the demand for affordable housing for this additional workforce in terms of rentals, hostels, apartments, etc.; and (vii) complaint handling Mechanism at the project level Additional measures that aim to reduce incentives to engage with the local community by providing workers with the opportunity to spend their time off away from the host community, where feasible with a small transport allowance, ideally allowing workers to regularly return for brief visits to their families, spouses, and friends, or to visit nearby urban centres that provide a variety of legal social opportunities. For workers who need to travel further, it may be attractive to forego weekends off in exchange for longer breaks that would allow for such home leave travel. While clear and decisive measures by the contractor are critically important, the effectiveness of these measures often depends on complementary actions by the Borrower. Those are typically focused on public administration and law enforcement, such as: (i) reinforcing local police in a remote setting, where services may not be sufficiently staffed or equipped to maintain public order after the influx, (ii) ensuring that complaints about gender-based violence are taken seriously by local law enforcement, which may be supported by (iii) deploying female officers to the project area, and (iv) participating in preventive training with workers to demonstrate the presence of government authority in the project area. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 183 CHAPTER 10. INSTITUTIONAL FRAMEWORK AND BUDGET FOR ESMF ADOPTION Ever since the ICZM Project (2010), NPMU has an established organization support structure to ensure that the policy obligations and associated procedures in the ESMF are implemented. The implementation experience of ESMF in coastal management projects necessitates extension of the responsibility to respective SPMUs and PEAs to enhance safeguard arrangements at the implementation level, besides Capacity Building for continued incorporation of environmentally acceptable measures for all future coastal development activities. 10.1 Proposed Institutional Framework at National, State, Project Levels Proposed institutional framework at National, State and Project levels and suggested responsibilities for environmental and social safeguards are presented in the following Figure 8.1. National State Level Project Level Level Technical E&S Audit Review DPR, ESIA Consultant Committee for Contractor/ Consultants PEA DPR, ESIA CBO for different projects Contractor NPMU SPMU PEA Contractor DPR/ESIA PEA PMC/ NCSCM (PEA) consultants & Review ESIA NGO for National on Natural Quality Contractor Components Habitats Assurance Consultants • Project Director • Project Director • Project Engineers • Contractors • Assistant Project Director • Assistant Project • Environmental (for Engineer / Manager/ • ICZM Planners, Director Construction and Coordinator Engineers • ICZM Planners, Biodiversity) • EHSS Support • Procurement Specialist Engineers, Subject Experts Officers (based on • Financial Management Specialists • Social Experts (for degree of impact) Specialist • Procurement Specialist social development, • Environmental and Social • Financial Management Community Safeguard Managers Specialist consultations, • Environmental Specialist Gender aspects) • Social/Gender Specialist Legend: NPMU: National Project Management Unit NCSCM: National Centre for Sustainable Coastal Management SPMU: State Project Management Unit NGO: Non-Governmental Organizations PEA: Project Executing Agency CBO: Community Based Organizations PMC: Project Management Consultant ` DPR: detailed Project Report E&S: Environmental and Social ESIA: environmental and Social Impact Assessment EHSS: Environment, Health, Safety, and Social Figure 10:1 Proposed Institutional Framework for Safeguards Management for ENCORE Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 184 10.1.1 NPMU SICOM, under the MoEFCC, is the NPMU for the Program. ENCORE Program activities are overseen by Project Director of NPMU with the support of Assistant Project Director. In addition to the professionals including ICZM Planners, Environmental / Civil Engineers, Biodiversity Specialist, Procurement, Financial Management specialists; Environmental and Social Managers will also be also deployed to ensure implementation of ESMF during both project preparation and implementation. Currently, NPMU has two Environmental and Social Managers (one Environment and one Social) who would be adequate for the same. The outline ToR for the environmental and social Managers is presented in Volume II of this ESMF document. The biodiversity officer at NPMU will also provide inputs to review and clear projects involving natural habitats. NPMU will be responsible to oversee and provide guidance and approval to the environmental and social actions on projects by various SPMUs. NPMU will also review the findings of the Annual Environmental and Social Audit and guide corrective actions if required. Environmental and Social Managers of NPMU will also prepare suitable formats and ensure record keeping on environmental and social actions under this project for any further reporting. SICOM will be supported by NCSCM on technical and scientific aspects. Any clarifications on the applicability of CRZ rules or technical/scientific aspects related to coastal/marine / natural habitats and the need for a special review of projects involving natural habitats will be sent to NCSCM for clarifications and suggestive good practices. Detailed Management Information System linking project details, scheduling and documentation to the ESIA process and ESMF implementation will support the NPMU in the effective preparation of safeguard instruments, supervision, and monitoring. Thus, the role and responsibilities of the Environment and Social Specialists at the NPMU shall include: • Updating of the ESMF document, • Training and orientation of the PEAs on the requirements and application of the Environment and Social Management Framework, • Reviewing the monitoring reports submitted by the States on compliance with the ESMF, including the ESMPs, • Undertake Annual site visits, specifically covering sub-projects near environmentally sensitive sites, across the implementing states, to review compliance with the ESMF and sub-project specific plans, • Provide guidance and inputs to the SPMUs on environment and social management aspects, including documentation, • Maintaining and reviewing the safeguards aspects using a full-fledged MIS • Act as a single point of contact for resolving queries related to environment and social issues (along with NCSCM), • Prepare regular reports/updates for the World Bank. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 185 10.1.2 SPMUs SPMUs will be formed to oversee the project activities in the respective States. SPMUs will also have ICZM specialists in various fields, procurement, financial management specialists and environmental and social specialists under the leadership of Assistant Project Director and Project Director. The design team in SPMU will oversee the preparation of DPRs and incorporating Environmental and social aspects highlighted in ESIA. SPMU oversees ESMF implementation by PEAs during all project stages and maintains records on project – wise/implementing agency -wise report on environmental and social actions at respective State Levels. SPMU environmental and social Specialists guide the PEAs to undertake environmental and social Screening of each subproject. Their main role is to ensure that environmental and social requirements set forth for the program are applied appropriately to subprojects, and the implementation of sub-projects is carried out in line with ESMF, applicable Government of India regulations and World Bank safeguard policies. SPMU specialists are mandated to review and approve the categorization of the project based on screening information provided by the PEAs and provide guidance to ensure that the environment and social safeguards documents (ESIAs/ ESMPs) are prepared satisfactorily leading to approval of sub-projects. SPMU will also guide and co-ordinate with PEAs to get requisite approvals from National / State levels as required by various rules/acts and maintain record on approval/clearance status and reasons for delays if any. As part of the appraisal, the environmental and social conditions identified for sub-project approval and the final documents will be approved by NPMU/World Bank and disclosed. SPMU will supervise and monitor the implementation of social and environment safeguards in sub-projects as per this ESMF. The environmental and social specialists of SPMU shall undertake quarterly visit to subprojects to ensure compliance with ESMPs/ ESMF; and guide and support PEAs/contractors to oversee safeguards management, prepare quarterly progress reports on this for submission to NPMU, review monthly progress reports by PEAs to resolve any issues, join the field visits undertaken by NPMU as part of annual monitoring of the subprojects. unscrupulous All safeguards instruments for E1/S1 projects will be subject to the World Bank's prior review and clearance by the World Bank safeguards specialist assigned to the ENCORE Program. • Environmental Screening Reports • TORs for Environmental Assessments • ESIAs, and ESMPs Upon clearance, safeguards instruments can be included in bidding documents and other procurement documents. Work shall not commence on project sites without due clearance of the respective safeguards instrument. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 186 Upon project commencement, the safeguards specialist of SPMU shall prepare a datasheet in tabular format and maintain an MIS to track all requisite safeguards instruments for sub-projects. This Project Info-Table or MIS shall be continuously updated as and when each subproject starts or as required. The decision to start preparations for each subproject shall be conveyed to the SPMU safeguards specialists and / or procurement plan for each quarter shall be shared well in advance to initiate screening, categorisation, and preparation of ESIAs. This sheet shall be submitted to NPMU as part of the quarterly progress report sent by SPMU. NPMU shall, in turn, share this along with the World Bank safeguards specialist every quarter or when requested. Thus, the design team, procurement team and environmental and social specialists shall oversee the incorporation of actions in relevant reports, estimates, bids and implementation of ESMF as well as other environmental and social provisions specified in the applicable regulatory frameworks. Duties and responsibilities of the environmental and social specialists are compiled in Volume II. 10.1.3 Project Executing Agencies (PEAs) The PEAs shall have dedicated environmental and social experts with appropriate qualifications and experience for coordinating with Local Bodies, line departments and SPMU. They shall undertake screening of the projects following the exclusion list and IESE formats in ESMF Volume II. For this; they shall co-ordinate and get guidance from the specialists in SPMU (for State Projects) / NPMU (for National Projects). They shall evaluate the appropriacy of the consultants (with guidance from SPMUs) who would prepare ESIAs, guide ESIA preparation (with guidance from SPMUs) and review the ESIA documents and send them to SPMU / NPMU for clearance. They shall be mandated to support and co-ordinate for Government approvals and statutory clearances to ensure adoption of Environmental and Social safeguards, submit the relevant documents/ reports for the adopting and compliance of the ESMF, as required. PEA will assist in securing of “Enter Upon Permissions and Land alienation" for other Government lands and processing the private land acquisition proposals with District Administration. PEA will verify and certify the sites are free of encumbrances and all required permissions are received before handing over the site to the contactors for construction. Environmental and Social experts of the PEA will submit the compliance reports to SPMU on clearances, permits, and environmental and social safeguards along with physical progress reports, as required. The frequency of compliance report submission is monthly or as needed. Special compliance reports on any environmental and social action points suggested by SPMU / NPMU may also be submitted as and when required considering the need to follow up and ensure environmental and social actions to mitigate implementation / other risks. The PEAs (line departments) shall be responsible for the execution of the contracted work either through the contractors or internally by the department staff. They will Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 187 ensure during the day-to-day functioning that the ESMF, ESMPs and the RAPs, are implemented by contractors/others concerned properly in their respective sub-projects. The PEAs shall carry out the following key tasks: • Prepare project designs (pre-feasibility/feasibility/DPRs) inhouse / through consultants, • Leading social and environment screening exercise for every sub-project site, through their environmental and social experts, • Integrate findings of the screening and assessments (where applicable) in the sub- project selection and/or design process, • Preparation of the EA/SA and ESMP/RAP documents along with the DPRs where applicable either through internal resources or external consultants, its initial review and forwarding to SPMUs. They shall also through consultants incorporate the comments of stakeholders, SPMU/NPMU and the World Bank so as to finalise the reports, • On-site review for compliance with the ESMF, ESMP and the RAP requirements, • Providing safeguard inputs/onsite compliance of safeguards into the MIS, • Take required actions, including application of contractual remedies, on contractors when needed, • Provide required update/data/information/ monthly reports to the SPMU on ESMF implementation. 10.1.4 Project Management Consultants (PMCs) PEAs may require the support of PMCs for certain projects. SPMUs / PEAs will appoint PMCs with adequate technical and managerial manpower (including environmental and social safeguard specialists) and expertise on specific project types. The TOR for PMC services shall include supervision of environment and social impacts in the implementation of the projects mainly in case of E1 and S1 projects. PMC shall be well equipped to guide the contractors and PEAs on safeguards adoption and best practices. The PMC will submit monthly compliance reports on environmental and social safeguards along with physical progress reports, as required to the PEAs/ SPMU / NPMU as applicable. In case of special requirements/emergency follow up on environmental and social actions, the PMC shall submit such follow up reports as and when required. 10.2 Capacity Building NPMU envisages capacity building for all other agencies involved including SPMUs, PEAs (including Line Departments, Local Bodies, Statutory Boards, Public Undertakings) and Potential Private Operators, PMCs, and Contractors in order to ensure that the ESMF is effectively operationalised. This will be accomplished by Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 188 organising sensitization programs, workshops, and training programs, which will be co- ordinated and anchored through training institutions in respective States and other local and National Institutions (such as NCSCM) and individuals experienced in various aspects of coastal management and infrastructure provision. The expertise of the World Bank also will be availed for capacity building exercise. Orientation programs on the various aspects like environmental and social aspects, Project Management and Engineering and Public Health will be conducted. ESMF training will be specially structured and delivered to PEAs. Discussants can include line departments, and Pollution Control Boards. ESMF training includes ESIA methods, new land acquisition and R&R act, preparation and implementation of ESMP and RAPs, consultations and public hearing, regulatory requirements, ESMF adoption and compliance, sustainable urban/regional/coastal development, energy efficiency, climate change resilience, mitigation, and adaptation, etc. Indicative details of the training program are presented in Table 10:1. This will be elaborated, and a proper training plan and schedule/module will be devised by NPMU/SPMUs through the support of national training institutions. NPMU will make a conscious effort to mainstream the environmental and social aspects of other main training programs under this project. The Environment and Social Specialists at the national level will provide technical assistance in the planning and design of the safeguard / environmental and social aspects of activities, including reviews and training. The training programs will aim at orienting the personnel towards value addition and enhancement benefits of proper management of environmental and social issues. NPMU will also enhance the capacity of its own staff and Environmental and Social managers in environmental and social safeguards, technical aspects of the proposed projects, through orientation programs, trainings, exposure visits to similar projects implemented, courses and participation in both national and international training courses and seminars/workshops. It is also suggested to organise workshops during years 2, 4 and 6 of the project for cross learning between the project experiences of SPMUs/PEAs. The World Bank specialists shall provide adequate training to SPMU / NPMU safeguard specialists thrice during the project duration: well-spaced to update the new techniques, practices and to effect cross-learning. Through this, the SPMU/NPMU safeguard specialists can attain the necessary guidance to train the sub-project staff. In addition, Safeguards specialists at NPMU and SPMU shall provide training to safeguards staff of PEAs, PMCs, and the contractors at the start of each sub project and mid-term during its implementation. This includes training on ESMP implementation and safeguards management during various sub-project stages; including during work close out / work exit. One such training shall be for PEAs or SPMUs to learning from each other’s experiences and good practices. The proposed training/capacity building activities for ESMF implementation will be supported through the TA Sub-component of ENCORE at an estimated cost of INR 170 Crores (USD 23.6 Million), for 3 Years of Phase I, MPA. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 189 Table 10:1 Outline of the Proposed Capacity Building Program on ENCORE (2020 – 2025) Sl Training Programs and Contents Presenter/s Frequency and Targeted No Modules Duration Participants A National Level Training Programs organised by NPMU I Orientation Program Two days (First NPMU, SPMU Module 1: About ENCORE - About ICZMP and Concept of ENCORE and involvement of NPMU Project Three modules – and PEA / Program Government of India, States and The World Bank (including Director / Assistant together in a day; PEA/Local Body Financing Instrument) Project Director fourth module on staff, technical - Technical and Financial Aspects second day) review committee - Project Implementation Set up members Module 2: ESMF and the - World Banks Safeguards Policies and Concept of ESMF Environmental / Social First Year Project Cycle and Regulatory - Applicable regulations: National, State, Local/others Specialists of NPMU, (before initiating Module 4 (Day Aspects - Project Cycle of ENCORE The World Bank implementation), 2): Environmental - ESMF incorporation in Project Cycle during Identification Third and Fifth Specialists attends (Screening, Categorization), Preparation, Appraisal, Implementation Year of Sub-module on (Monitoring, Audit) Implementation Environment & Module 3: Overview of - Overall Project Locations Environmental / Social Social Specialists Locations and Project - Expected impacts: activity wise Specialists of NPMU, attends sub- Activities; Impacts - Need for mitigation/management Forests, Pollution module on Social Control Board specifically Module 4: Sub-project level - ESIA: EA process, Identification of Environmental Impacts, Impact Environmental / Social Environmental and Social Identification Methods, Identification of Mitigation Measures, Specialists of NPMU, Assessments, Generic Formulation of Environmental Management Plan, Climate Change The World Bank Mitigation / Management adaptation and mitigation Plans, Implementation, and Monitoring, measures, Institutional Aspects, Institutional Mechanism budget (Case studies) - SIA: R&R policies and procedures, National & World Bank Requirements, LA process, Identification of PAPs, Social Entitlement Frameworks, Social Impact Assessment, RAP Techniques Beneficiary Assessments, IPPF Environmental and Social Management Framework for ENCORE Project, 2019. Vol I 190 Sl Training Programs and Contents Presenter/s Frequency and Targeted No Modules Duration Participants II Implementation Experience One day; NPMU, SPMU Sharing Program Second, Fourth and PEA Local Module 1: Experience Sharing - Experiences on implementation of ESMF in implemented projects Environmental / Social and Final Year Body staff, on ESMP Implementation - Best Practices-Site visits to project towns/sites Specialists of NPMU; of technical review SPMUs Implementation committee Module 2: Review of Audit - Discussion on the results of the annual audit on ESMF Environmental / Social members Results Specialists of NPMU Module 3: Stakeholder - Stakeholder Analysis Environmental / Social Participation and Community - Participation models in various projects by CBOs, Communities, Specialists of NPMU Engagement Individuals, Private parties, PEAs Module 4: Best Practices - Site visit to select projects to display best practices in any Environmental / Social Show-case field/aspect Specialists of NPMU; SPMUs B State Level Training Programs (in each Project State) organised by SPMU I Orientation Program Two days; First SPMU and PEA Module 1: About ENCORE - About ICZMP and Concept of ENCORE and involvement of Environmental / Social (before initiating staff/ Local Body, Program Government of India, States and The World Bank (including Specialists of SPMU, implementation), line departments, Financing Instrument) NPMU Third and Fifth technical review - Technical and Financial Aspects Year of committee - Project Implementation Set up Implementation members, PMCs, Module 2: ESMF and the - World Banks Safeguards Policies and Concept of ESMF Environmental / Social NGOs, Project Cycle - Applicable regulations: National, State, Local/others Specialists of SPMU, Communities, - Project Cycle of ENCORE, ESMF incorporation in Project Cycle NPMU CBOs during Identification (Screening, Categorization), Preparation, Appraisal, Implementation (Monitoring, Audit) Module 3: Regulations, Sub- - Overall Project Locations Environmental / Social project level Environmental and - Expected impacts: activity wise Specialists of SPMU, Social Assessments, Generic - Need for mitigation/management Environmental and Social Management Framework for ENCORE Project, 2019. Vol I 191 Sl Training Programs and Contents Presenter/s Frequency and Targeted No Modules Duration Participants Mitigation / Management NPMU, Pollution measures, Institutional Aspects, Control Board, Forests budget Module 4: Stakeholder - Stakeholder Analysis Social Specialists of Participation and Community - Participation models in various projects by CBOs, Communities, SPMU Engagement Individuals, Private parties, PEAs II ESMP Implementation One day; Every PEA staff, Module 1: Environmental - Clearance / permits / regulatory aspects Environmental / Social Year, starting Contractors, Line Enhancement and Occupational - Occupational Health & Safety Training Specialists of SPMU from Second departments, Health and Safety - Staff & Labour Code of Conduct PMCs - HIV/AIDS prevention Training, Best hygiene practices - Emergency Response System - Behavioural Training - Implementation of ESMP provisions Module 2: Review of Audit - Discussion on the results of the annual audit on ESMF – specifically Environmental / Social Results focusing on ESMP implementation, contractors / PMCs performance Specialists of SPMU and corrective actions with Auditors, NPMU Modules for training may be developed keeping in the needs of the various target groups/stakeholders. A more comprehensive plan on training and capacity building will be included in the Operations Manual for the project, which is currently being drafted/developed in consultation with the states. Environmental and Social Management Framework for ENCORE Project, 2019. Vol I 192 10.2.1 Subproject Monitoring: Environmental and Social Management The environment management instruments provide guidance on monitoring and evaluation parameters and describe the institutional arrangements to facilitate the ‘process’ and ‘progress’ monitoring. Designated Environment and Social Specialists at various levels shall be responsible for overseeing compliance of the sub-projects to Bank safeguards, GoI regulations, and applicable ESMF guidelines. They shall also review regularly the timely implementation of environment and social provisions as per the ESMF, ESMP, and RAP, where applicable. The monitoring and reporting will be done by line departments/implementing agencies to SPMU, which in turn will be reporting to NPMU. The following aspects shall be monitored and reported as per the frequency provided in Table 8.2 below. Corrective actions shall be initiated in a planned manner as appropriate to ensure compliance with the ESMF/ESMP measures. Table 10:2 Monitoring Schedule Sl.No. Particulars Frequency Reporting Monitoring Responsibility responsibility 1 ESMF Compliance/Status Monthly/ PEA, SPMU - Project Report, including screening Quarterly Environmental and Director and results, status of conduct of Social Experts Environmental and ESIA/SIA and actions taken Social Specialists for compliance 2 Environment and social site Quarterly PEA/PMC, SPMU - Project visit report Environmental and Director and Social Experts Environmental and Social Specialists 3 Regulatory clearances - Quarterly PEA/PMC, SPMU - Project Environment Environmental and Director and Social Experts Environmental Specialists S4 Verification of land to be Monthly PEA, Social Expert SPMU - Project acquired and status of land Director and Social acquisition Expert 5 Distribution of entitlements Monthly PEA, Social Expert SPMU - Social Expert and assistances 6 Community consultations Quarterly PEA Environmental SPMU - Project and Social Experts Director and Environmental and Social Specialists 7 Grievance redressal Monthly/ PEA Social Expert SPMU - Project Quarterly Director and Environmental and Social Specialists Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 193 10.2.2 Reporting Formats Reporting formats shall be developed by NPMU to get progress and results data of the project from the field. This will also help in synchronising and streamlining reporting requirements from the various SPMUs to the NPMU. 10.3 Budget for ESMF Implementation To effectively implement the environmental and social management measures suggested as part of the ESMF, necessary budgetary provisions will be made in the DPRs for the individual subprojects. The tentative budget for each of the projects should include environmental management costs along with the good engineering practices and cost of environmental and resettlement monitoring. As presented in sub-section 5.5.1, the budget for complying with the ESMP needs to be worked out for each sub-project by working out the cost of implementing each ESMP mitigation measure. Where this is not possible, the provision of a minimum of 2 percent of the sub-project cost needs to be earmarked for implementing ESMP measures. In addition, provision for ESHS performance security in the new bid documents shall be made to ensure ESMP implementation. All administrative costs for implementing the ESMF shall be budgeted for as part of the budget for human resources and other facilities while preparing the budget for PEA and PMU establishment and operations. Drawing from the project experience and current indicative costs of Category A projects the following Table 11:3 provides a rough estimation of costs for safeguard management and ESMF implementation. All safeguards instruments have been inbuilt in to the project modality and will be financed through the project and detailed project cost tables will include the necessary costs accordingly. Updated cost tables will be prepared when the ESMF is updated during each Phase of this MPA project. The associated cost to implement ESMPs as well as training for project staff, contractors, etc. have been integrated into the project budget. The project will ensure that all works contracts will include the ESMP, and the cost of implementing the ESMP will be identified as an item in the Bill of Quantities. The budget for ESMF implementation has been calculated based on assumed rates for safeguards management for a National program. This should be made part of overall program costs for ENCORE to ensure smooth implementation of environmental and social aspects including safeguards management through the use of this framework. The budget is worked out for 3 years – Phase I of MPA. This shall be revised and worked out as appropriate during the subsequent stages of MPA. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 194 Table 10:3 Proposed Budget for ESMF Implementation Sl Proposed Quan Unit Rate No: of Total Cost Total Cost Assumptions NO Safeguards tity (INR) or years (INR) (USD)84 Management Rate/Yr Activity 1 Environmental & 4 1800000 3 21600000 304598.1631 4 specialists @ Rs Social Specialists, 150000 per specialist Biodiversity and per month for 3 years Gender Specialists at NPMU 2 Environmental & 26 1200000 3 93600000 1319925.373 2 Specialists each for Social Specialists at all States and UTs; Rs SPMUs 100000 per specialist per month for 3 years 3 National Level 1 1000000 3 3000000 42305.30043 One training annually Training 4 State Level 39 750000 - 29250000 412476.6792 3 Trainings per State, Trainings (3 per for all 11 States and 2 State; assuming 11 UTs States) 5 Project screening by 195 200000 - 39000000 549968.9056 around 15 projects per PEAs State/UT for 13 States/UTs 6 Co-ordination and 13 1500000 3 58500000 824953.3584 lumpsum per year Travel for Safeguards Management by PMU (including site verifications, discussions, compliance monitoring, review committee meetings) 7 Preparation of 156 5000000 - 780000000 10999378.11 12 high / moderate Safeguards risk projects requiring Instruments clearances, for all States/ UTs (may be included in total cost if EPC contract depending on choice of implementation mechanism) 8 QA/QC and Project 13 3000000 3 117000000 1649906.717 All States, UTs each Management year Consultants for States 9 Project Management 78 1000000 78000000 1099937.811 50 percent of Consultants (for high/moderate risk coordinating projects-cost only for Safeguards safeguards/project Management) / E&S support 84 Exchange rate: 1 USD = 70.9131 INR Reserve Bank of India; 27 Sep 2019 Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 195 Sl Proposed Quan Unit Rate No: of Total Cost Total Cost Assumptions NO Safeguards tity (INR) or years (INR) (USD)84 Management Rate/Yr Activity project Management by PEAs 10 Annual 13 5000000 3 195000000 2749844.528 All States, UTs each environmental and year social Audit 11 ESIA review and 78 500000 39000000 549968.9056 Review required for CRZ Clarifications 50 percent of by NCSCM high/moderate risk projects Sub Total 1453950000 20503263.85 12 Contingencies & 15 218092500 3075489.578 Miscellaneous; perce including overall nt coordination and planning, emergencies Grand Total 1672042500 23578753.43 Say 168 Say 23.6 INR Million USD 10.4 The Roles and Responsibilities of the World Bank The World Bank project task team, specifically the environmental and social specialists, will provide close supervision and necessary implementation support by reviewing and providing guidance on conducting screening, and the preparation of relevant safeguard instruments as well as providing training for SPMU/NPMU specialists; as presented here: • Undertake prior review and provide feedback on suggested safeguards instruments, review of monitoring updates and other relevant safeguards documents, • Participate in regular missions to review overall safeguards performance and provide further implementation support, • Share knowledge on technologies and best practices, • Provide guidance on handling complaints and grievances from a technical standpoint, • Provide training support on the Bank’s safeguard policies and safeguard requirements of the project. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 196 CHAPTER 11. GRIEVANCE REDRESS MECHANISM, CONSULTATIONS AND INFORMATION DISCLOSURE 11.1 Grievance Redress Mechanism Effective grievance redressal mechanism gives an opportunity to the organization to implement a set of specific measures to ensure good governance accountability and transparency in managing and mitigation of environmental and social issues of a particular project. This consists of defining the process for recording/receiving complaints and their redressal in respect of environmental and social matters. The Grievance Redressal Mechanism for the ENCORE Program incorporates an integrated system with Grievance Redressal Cell (GRCs), with necessary officers, officials, and systems, at the SPMU in all the states and UTs. There should be a person in change/nodal officer at the PEA, SPMU and NPMU level to receive the complaints. Grievances may be submitted through various mediums, including in person, in written form to a noted address, e-mail, social media (if comes to the notice of the concerned authority), or through direct calls to concerned official/s. The Social and Environmental Expert/ person in charge of the concerned agency shall be responsible for the coordination of grievance/complaints received. The grievance redress mechanism should be in place at the time of initiating the implementation of RAP and project implementation activities in the area. A platform for grievance redressal should be organized and its regular meetings may be conducted so as to allow people to put forth their grievances. It will help the appropriate authority to find solutions and amicably address the issues. 11.2 Web Based Grievance Mechanism In case of grievances received through toll free number or web-based system, a person will be made in-charge of screening and resolution of the same/communicating with the concerned divisions for resolution of the same. The person in-charge based on the nature of the complaint, will forward the same to the concerned official. A ticket or a unique number will be generated for all such complaints. The complainant will follow up based on that unique number. All calls and messages will be responded within two weeks. If the response is not received within 15 days, the complaint will be escalated to the project head. The websites of SPMU and PEA will include a link where affected person(s) can register their complaints online. A telephone number will also be on the website of SPMU and PEAS and displayed on the project sites so that the general public can register their complaint with the SPMU office. Facilities available: Locations Information (the complainant has the right to keep his/her identity undisclosed) Project sites Phone number (of all the concerned authorities including SPMU and NPMU, SCZMA/NCZMA, and the national toll-free number), email, complaint box, link to website Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 197 Locations Information (the complainant has the right to keep his/her identity undisclosed) PEA (displayed at office Phone number (of all the concerned authorities including SPMU and NPMU, and website) SCZMA/NCZMA, and the national toll-free number), email, complaint box, link to website for registering complaint SPMU (displayed at office Phone number (of all the concerned PEAs, NPMU, SCZMA/NCZMA,) and the and website) national toll-free number), email, complaint box, link to website for registering complaint NPMU (website) Phone number (of all the concerned PEAs, SPMUs, list of social and environmental expert in-charge in all the SPMUs, SCZMA/NCZMA,) and the national toll-free number), email, link to website for registering complaint, link to social media 11.3 Three-tier Grievance Management System 11.3.1 First-tier Grievance Redress The community organizers at the village/project site, for each activity implemented at the village level, will be the first level contact for any aggrieved person. On a fixed date of every month, individuals/community can approach the community organizer to register their grievances. That apart, the project sties will have information board with the (i) name of the PEA; (ii) name of the nodal grievance redress/social development officer of SPMU; and (iii) a toll-free number to register grievances. The community organizer will prepare a monthly report on these cases and submit to the respective PEA. Wherever the nature of the project activity does not include a community organizer, the Nodal Officer of the PEA will assume the same responsibility. Tiers of Nodal Person for Contacts, Communication and Other Timeframe Grievance Contact Facilitation by Project to address Redress grievance Mechanism Project Site or Community ▪ Each Project Site or Village will have 15 days Village Organizer or Nodal Information Board listing the names and contact Officer of PEA telephones. ▪ One public meeting day with a regular pre- decided schedule organized every month. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 198 11.3.2 Second-tier Grievance Redress Any grievance of the community/individual addressed to the community organizer if remains unresolved will be passed on to the higher level by the community organizer. At the SPMU level, the grievance redress mechanism will comprise of the (i) grievance registration system as described above, (ii) a dedicated staff of the Communication and Capacity Building Cell of SPMU to prepare monthly reports on grievances and escalate specific grievances within a day of receiving a complaint or grievance to the SPMU Grievance Committee, and (iii) a Grievance Committee of the SPMU which will include the Additional project Director, the Social Development Specialist of SPMU and the Communications Specialist of the SPMU. This committee will prepare a quarterly report on grievances received and resolved and provide specific detailed description of the cases where the issues were escalated, and submit to the State Project Director, within 10 days of completion of each calendar quarter. The mechanism at NPMU will be exactly the same. Tiers of Nodal Person for Contacts, Communication and Other Timeframe Grievance Contact Facilitation by Project to address Redress grievance Mechanism SPMU / NPMU Social Development ▪ A toll-free dedicated telephone number to 30 days Specialists and register grievances, advertised in each Communication Information Board at Project Site or Village. Specialists ▪ Website advertisement, public notices in print media. ▪ Additional means include the social audit and surveys undertaken by the third-party monitoring consultants; or annual stakeholder meetings. ▪ In-house monitoring of the project activities by the NPMU/SPMU technical, communication and capacity building cells are also expected to assist in the process of grievance registration and management. ▪ The Social Development Specialist will be responsible to ensure that there is no cost imposed on the aggrieved person due to the grievance redress mechanism at the first and second tier Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 199 11.3.3 Third-tier Grievance Redress In case grievance is not addressed at this tier as well, the aggrieved person can approach the State Coastal Zone Management Authority or the National Coastal Zone Management Authority, as the case may be. The National and State Coastal Zone. Management Authorities have, apart from representation from the Government agencies, members who are either experts independent of the Government or representatives of NGOs working on coastal zone management issues. The State/National Project Director, through the Department of Environment of the State or the MoEFCC, will place the case in the agenda of the SCZMA/NCZMA meeting. The SPMU/NPMU Social Development Specialist will be responsible to prepare all background documentation for the SCZMA/NCZMA to consider the case with all required information. The Communication Specialist in SPMU/NPMU will be responsible to inform the aggrieved person the process of contacting the SCZMA/NCZMA, and the date and time of the meeting of the SCZMA/NCZMA at least 3 days in advance of the meeting. Tiers of Nodal Person for Contacts, Communication and Other Timeframe Grievance Contact Facilitation by Project to address Redress grievance Mechanism SCZMA or State or National ▪ Only after exhausting the first and second tiers 60 days NCZMA Project Director, with ▪ Website advertisement, public notices in print assistance from media. SPMU/NPMU ▪ State Project Director will place the specific grievance and the background documentation in Social Development the agenda of the SCZMA/NCZMA meetings. Specialists ▪ The aggrieved person can attend the hearing by SCZMA/NCZMA in person. ▪ The Social Development Specialist will be responsible to ensure that there is no cost imposed (such as for travel, etc) on the aggrieved person if the person belongs to the vulnerable groups. If required, the Social Development Specialist of the concerned Community Organizer shall represent the aggrieved vulnerable persons. ▪ Further, the project will assist the vulnerable aggrieved person if such a person is requested to attend the hearing in person by any of the following - SCZMA/NCZMA, Secretary, State Department of Environment, or Secretary, MoEFCC. 11.4 Assistance for aggrieved persons belonging to vulnerable groups for accessing legal recourse If an aggrieved person is not satisfied with the results of grievance redress by the SCZMA/NCZMA, such a person can approach the Courts, under the laws of the Country, and the verdicts of the Courts will be final, as per the judicial processes established in India. In general, the legal system is accessible to all such aggrieved persons. However, there might be cases where vulnerable sections of the citizens of India face hurdles in accessing the legal recourse system. These hurdles usually include the cost of litigation, knowledge about the legal Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 200 system, or the lack of awareness about formal legal procedures. To help citizens to access the legal recourse system, each State has an operational mechanism called the Legal Aid Centre, which provides free services including services of lawyers without any cost to the litigants. SPMUs in this project will establish a partnership with respective State legal Aid Centre to provide such services to the aggrieved persons claiming impact from the project. As part of the partnership, the project will reimburse all additional costs that accrue to the State Legal Aid Centres. This facilitation will be available to the aggrieved person(s) if they fulfil the following two conditions: (1) that such aggrieved person(s) belong to any of the following vulnerable sections of the society - below poverty line families, scheduled castes, scheduled tribes; or is disabled, handicapped, orphaned or destitute person; and (2) such a person or persons have at least accesses both the second and third tier grievance redress mechanism offered by the project. 11.5 Stakeholder Consultation Framework This section describes the stakeholder consultation process that needs to be undertaken during the detailed assessments of the project activities. 11.5.1 Need for Consultations Stakeholder consultation is an integral part of the environmental and social assessment and provides inputs for the preparation of the Social and Environment Management Framework (ESMF). The overall objective of such consultations was to document the concerns of the stakeholders with specific reference to the project planned interventions. The consultation meetings were organized basically for two important purposes, i.e., (1) to share project objectives and proposed project interventions with the identified stakeholder groups and (2) to consult with the stakeholders and document their concern, with particular reference to social and environmental impacts of the proposed project interventions. To understand the expected project benefits/risks and people’s perception of the project, field visits will be conducted to different places within the planned project jurisdiction. In the process of assessment, the mapping of stakeholders will be done in the visited areas to understand how the project is going to impact these stakeholders. The SPMU under the guidance of the NPMU through the PEAs will consult all key stakeholders on the project safeguard documents (for category E1, S1, E2, S2projects) during the process of assessment. The Stakeholder Consultation will provide a summary of the proposed project´s objectives. Stakeholder analyses and consultations will be used to identify the requirements, priorities, concerns and conflicts, development risks and opportunities. Consultation, participation, and disclosure will ensure that information is provided and feedback on proposed design is sought early, right from the preparation phase, so that the views/preferences of stakeholders including potential beneficiaries and affected person can be adequately considered, and continue at each stage of the activity preparation, processing, and implementation. Meaningful stakeholder consultation and participation are part of the activity preparation and implementation strategy. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 201 The key stakeholders to be consulted during project activity preparation and implementation include: 1. Project beneficiaries, and project affected persons 2. Elected representatives, community leaders, and representatives of community-based organizations; business and industrial associations, etc., 3. Relevant local NGOs; 4. Local government and relevant government agencies, including the authorities responsible for land acquisition, protection and conservation of forests and environment, archaeological sites, religious sites, and other relevant government departments (regulatory, administration and infrastructure services related) 5. Residents, shopkeepers, business people, farmers (owners and workers) who live and work alongside the canal embankment and near sites where facilities will be built; custodians, and users of socially and culturally important buildings; 6. Vulnerable groups, women groups, etc. At the minimum, the proponent must meet with the principal stakeholders to inform them about the proposed project activity and to solicit their views about it. More extensive consultations are required for specific project activities that have significant impacts. The methods and results of the consultations shall be documented in the ESIA Report. All consultations need to be a two-way dialogue with the aim of informing the stakeholders about the potential impacts (positive/negative) and obtain their feedback and views about the project activities and the proposed mitigation measures. All consultations need to be inclusive of all groups and gender, transparent and documented. The implementing agencies will conduct meaningful consultations with all relevant stakeholders who are directly or indirectly affected. For this purpose, SPMU will prepare a consultation plan with all stakeholders. The proceedings and outcomes of these consultations will be recorded. For the ESIA, the SPMU will, with the support of participants, summarize how the consultations were conducted, key topics discussed, and the decisions arrived at. These decisions will be incorporated into the ESIA and ESMP. Photographic records and signatures of participants will be recorded in the ESIA report. SPMU will draft ESIA and ESMP after discussions with all stakeholders. The implementing agencies will inform stakeholders and communities about the project activities, obtain their views, and hear their comments and complaints. Through periodic consultations with the local community, SPMU will engage them in project planning, implementation, and monitoring. Consultations will be conducted in an atmosphere that is conducive to the project development and beneficial to the community and local population. The SPMU will ensure that the consultations are free of coercion and intimidation, are gender-inclusive, and tailored to the needs of disadvantaged and vulnerable groups. All relevant stakeholders will be informed in advance about the timing and format of the consultations. This will be done through advertisements in local newspapers and / or written letters to the district magistrates, representatives of relevant departments, heads of the local village councils, representatives of urban local bodies, and NGOs in the vicinity of the project sites. During the consultations, Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 202 information about the project, its rationale, scope, benefits, and costs, including potential environmental and social impacts and mitigation measures, will be presented by the SPMU. Comments and suggestions of all stakeholders will be noted, and their queries will be clarified. The signatures of all participants will be collected. Photographs of the consultations will be taken for the record. The comments and suggestions will be recorded and how these have been addressed will be detailed in the ESIA report. During project implementation, safeguards experts will have informal discussions with the locals residing in the vicinity of the proposed project activity sites. They will note the grievances, if any, due to construction. The purpose of consultations is to give factual information about the project to the stakeholders and to clarify misconceptions if any. This process helps in enhancing local ownership and ensures smooth project implementation in the long run. A variety of approaches can be adopted, and stakeholders should be consulted throughout the project implementation. At minimum, the following consultation activities should be conducted. This is indicative and SPMU can also adopt more effective methods and approaches, which are locally appropriate. Table12.1 : Details on Stakeholder Consultations required during various Project Stages Project Stage Consultation Activities Remarks Project activity Household level consultations through sample At the start of the project - preparation questionnaire surveys on service levels, needs, during the detail designing priorities for project preparation stage Consultation with all line departments) and other At the start of the project - Government Establishment as well as private during the detail designing agency stage Focus group discussions with people During the visits to project residing/working near the project sites sites Consultations with affected persons: affected At various stages since the persons shall be consulted to ensure: beginning, especially during, • incorporate their views/concerns on the preparation and compensation/resettlement assistance implementation of the • incorporate their views/concerns on resettlement plan mitigation measures for identified impacts • inclusion of vulnerable groups in project benefits • identify assistance required by affected persons during rehabilitation, if any • Avoid potential conflicts for smooth project implementation. It will also provide adequate opportunities for consultation and participation to all stakeholders and inclusion of the poor, vulnerable, marginalized, and affected persons in the project process Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 203 Project Stage Consultation Activities Remarks Activity Focus group discussions with the people During the ESMP monitoring Implementation residing/working near the project sites at work sites Informal discussions with the construction During the ESMP monitoring workers and construction supervision staff at work sites (contractor, consultants, and PIU) Informal discussions with commuters and the During the ESMP monitoring general public along the roads where works are at work sites implemented 11.6 Information Disclosure 11.6.1 Procedure Information Disclosure Procedures Project related information shall be disclosed through public consultation and making relevant documents available in public locations. The SPMU and associated line departments shall provide relevant safeguards information in a timely manner, in an accessible place and in a form and languages understandable to affected persons and other stakeholders. For illiterate people, other suitable communication methods will be used. The draft ESMF report has to be discussed with the SPMUs at the NPMU before making it available at the offices of SPMUs. A concise summary of project and draft ESMF report (in local languages and UTs), providing all necessary details of proposals, implementation arrangements, project locations, likely issues and mitigation, and monitoring measures and grievance redress mechanism, shall be made available to the stakeholders. This should also provide contact information of the project agency. This summary shall also be displayed at the notice boards of SPMU, district level offices of the PEA and related line departments -DM’s Office, State and District Libraries, Local municipal and gram panchayat office and other public places. During project implementation, relevant information about any major changes to the project scope will be shared with beneficiaries, affected persons, vulnerable groups, and other stakeholders. The following documents shall be made available at the offices of SPMU, DM’s Office, State and District Libraries, Local municipal and gram panchayat office and other public places for public reference and shall also be uploaded on respective websites. 1. Summary of project and draft ESMF (in local languages and English) 2. Draft ESMF Report (in English) Once the draft is finalized after consultation with the stakeholders including the implementing agencies. The following documents will be made available at offices of SPMU, offices of the PEAs, DM’s Office, State and District Libraries, Local municipal and gram panchayat office and other public places for public reference shall also be uploaded on respective websites. 3. Final ESMF Report (in English) 4. Updated/amended ESMF (in English) 5. Corrective action plan prepared during project implementation (English) 6. Semi-annual Environmental Monitoring Reports (English) Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 204 The following documents will be submitted to the World Bank for disclosure on Bank’s website. NPMU will send written endorsement to The World Bank for disclosing these documents: 1. Draft ESMF; 2. Final ESMF; 3. A new or updated ESMF and corrective action plan prepared during project implementation, if any; and 4. Environmental monitoring reports 11.6.2 Information to be disclosed Table below specifies the type of additional information and frequency of dissemination: Table 11.1: Information Disclosure Matrix Topic Documents to be Frequency Where Disclosed Environmental ESIA, ESMP and Once in the entire World Bank’s website. and Social Resettlement Action project cycle. But to On the website of SPMU, Impact Plan (RAP). remain on the The borrower would make the Assessment; website and other ESIA, ESMP, and RAP available Resettlement, disclosure locations at a place accessible to displaced Rehabilitation throughout the persons and local NGOs, in a and Land project period. form, manner, and language that Acquisition are understandable to the PAPs in the following offices: Local PEA office DM’s Office State and District Libraries Local municipal and gram panchayat office Office of the contractor Resettlement & Once in the entire Distributed among Project Rehabilitation Policy project cycle. Affected Persons (PAP) translated in Bengali Information regarding Once at the start of Through one-to-one contact with impacts and their the project and as PAPs. entitlements in and when demanded Community consultation Bengali by the PAP. List of PAPs with impacts and entitlements to be displayed in PEA’s office and on the website of SPMU R&R and LA monthly 10th day of every Website of SPMU. progress report. month Hard copy in the office of contractor in local language RAP Impact At midterm and end Website of SPMU and concerned Assessment Report of the RAP PEA’s website in the local implementation language. Land Acquisition As required under Website of SPMU and concerned notifications the direct purchase PEA’s website in local language Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 205 Topic Documents to be Frequency Where Disclosed GO of state Hard copy in the office of government contractor in local language Grievance redressal Continuous process World Bank’s website. process. throughout the On the web sites of PEA, SPMU, project cycle. and NPMU Hard copies in local language in the following offices: DM’s Office gram panchayat/municipality/municipal corporation office Office of the contractor PAPs to be informed on one to one contact Public Minutes of Formal Within two weeks On the web sites of PEA, SPMU, Consultation Public Consultation of meeting and NPMU Meetings Hard copies in local language in the following offices: DM’s Office gram panchayat/municipality/municipal corporation office Office of the contractor In addition to the information specified in Table 12.2, the following information shall also be displayed/disseminated, wherever applicable. 1. Project specific information needs to be made available at each contract site through public information kiosk 2. Project information brochures shall be made available at all the project sites as well as the office of SPMU / PEA. 3. Reports and publications, as deemed fit, shall be expressly prepared for public dissemination e.g., English versions of the ESIA, ESMP and RAP and Executive Summary of ESIA, ESMP, and RAP in local language. 4. Wherever civil work will be carried out a board will be put up for public information which will disclose all desired information to the public, for greater social accountability. 5. All information will be translated into local language and will be disclosed to the public through the Panchayat, District Magistrate’s office, concerned project offices, websites of SPMU. 11.7 Status of Consultations and Disclosure of this ESMF The need for ESMF and its contents were presented to all participating States during various interactions during February – March 2019. The SICOM, the NPMU for the ENCORE Program also carried out one-to-one discussions on subprojects, their environmental and social aspects Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 206 and ESMF procedures with the NCSCM, SPMUs, PEAs / other State representatives, academic / research institutes and the beneficiaries and host communities during the process of preparation of respective Project Reports and safeguards documents for ENCORE. A list of stakeholders who attended these meetings are provided in Annexure IV of Volume I of ESMF. The draft ESMF was disclosed on the SICOM website85 and NCSCM website86 in June 2019, with a request to the stakeholders and the public to provide comments. The hard copies of the document are also available at their offices and SPMU offices for reference. The draft ESMF has been reviewed for clearance by the World Bank and has also been disclosed in the Internal Documents Unit (IDU) of the World Bank following applicable procedures on Aug 1, 201987. The draft ESMF was also presented to the stakeholders during various State and National Level workshops, meetings and one-to-one discussions held during May - June 2019. All comments and suggestions (mainly clarifications) have been suitably incorporated in the document. Apart from national-level consultation, state-level consultations were also carried out. The comments received from state entities and various stakeholders have also been incorporated in the ESMF to finalise the same. Executive Summary of the ESMF has been translated into Hindi and local languages of key project state for wider discussions and disclosed in the websites of NPMU and SPMUs. The major outcomes of (final) stakeholder consultations are as follows: • At the national level, the stakeholders expressed their willingness to implement the ESMF, • Stakeholders agreed to ensure that implementation of project interventions will not displace any community member to the extent possible, • Implementation of the Project and ESMF will ensure that there would be no harm to the coastal environment. The measures will enhance the life and livelihood of the community especially the fishermen who are dependent on the coastal area, • Community will be made aware of the proposed interventions and will be made partners in implementation wherever possible, • Community members to be trained so that they can subsequently manage the facility wherever required after completion of work. After preparation, Draft ESMF was disclosed in the offices and website of SICOM, NCSCM, and Department of Environment / Co-ordinating Departments of participating States inviting comments/suggestions of stakeholders. Draft ESMF was also presented to the stakeholders during various State and National Level workshops/meetings and one-to-one discussions held during May - June 2019. All comments and suggestions (mainly clarifications) have been suitably incorporated in the document. The revised draft has been disclosed on the SICOM and 85 http://sicom.nic.in/sites/default/files/ESMF-Encore%20-2019-Vol-I.pdf http://sicom.nic.in/sites/default/files/ESMF-Encore-%20Vol-%20II.pdf 86 http://www.ncscm.res.in/pdf_docs/ESMF%20-%20Encore%20-%202019-%20Vol-%20I.pdf http://www.ncscm.res.in/pdf_docs/ESMF-%20Encore-%20Vol-%20II.pdf 87 http://documents.worldbank.org/curated/en/362471564723196017/pdf/Environmental-and-Social-Management-Framework.pdf Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 207 NCSCM websites inviting comments from wider stakeholders. Further, after incorporating the comments of stakeholders the ESMF will be finalised and redisclosed in NPMU / SPMU offices and websites and in World Bank’s IDU following approval/procedural requirements. Apart from national level consultation, state level consultations were also carried out. The comments received from state entities (Refer Annexure IV) have been incorporated in the ESMF. 11.8 Conclusion This ESMF document for ENCORE, presented in two Volumes (Volume I and II) will act as the guidance document for the management of environmental and social aspects and safeguard management for all components of the project. This is a living document and shall be updated, if required; following the consultations, approval and disclosure requirements of the World Bank. Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 208 ANNEXURES Environmental and Social Management Framework for ENCORE Program, 2019. Vol I 209 Annexure I: Detailed Baseline Environmental Setting of Project States Detailed baseline environmental and social setting of the Project states is presented here. Figure A:1 Coastal States of India The following Figure A:2 presents the coastal districts of India; distributed in its coastal States. Environmental Management Framework for ENCORE Program, 2019. Vol I i Figure A:2 Coastal Districts of India Table A:1 Key Statistics of India Attributes Details Length of coastline 7516.6 km Mainland: 5422.6 km Island Territories: 2094 km Total Land Area 3,287,26 km² Area of continental shelf 372,42 km² Territorial sea (up to 12 nautical miles)193,83 km² Exclusive Economic Zone 2.02 x106 million km² Maritime States and UT Number of coastal States and Union Nine states Territories 1. Gujarat 2. Maharashtra 3. Goa 4. Karnataka 5. Kerala 6. Tamil Nadu Environmental Management Framework for ENCORE Program, 2019. Vol I ii Attributes Details 7. Andhra Pradesh 8. Odisha 9. West Bengal Two Union Territories 1. Daman & Diu 2. Puducherry Island Territories 1. Andaman & Nicobar Islands (Bay of Bengal) 2. Lakshadweep Islands (Arabian Sea) Total number of coastal districts 69 coastal districts in mainland India; 3 in Andaman & Nicobar and 1 in Lakshadweep Total number of coastal villages 24306 Coastal Geomorphology (Mainland) Sandy Beach 43 % Rocky Coast 11% Muddy Flats 36% Marshy Coast 10% Coastline affected by erosion 1624.435 km in mainland 132km in islands) Population Total Population of India 1.27 billion (Census, 2011) Population of Coastal States and UTs 560 million Total Population of coastal districts 171 million Percentage of population in coastal 14.2 districts of India Population of Island Territories 0.44 million Coastal Ecosystems Coastal wetlands 43230 km² Major estuaries 97 Major Lagoons 34 Mangrove Areas 31 Area under mangroves 5591 km² (57% East coast,23% west coast, 20% Andaman &Nicobar Islands) Coral Reef Areas 5 Marine Protected Areas 31 Area Covered by MPA 16488.5 km² Coastal Biodiversity Marine Algae 217 general 844 species Seagrasses 6 genera 14 species Mangroves 25 families, 43 genera, 39 species Associated flora: 420 Associated fauna: 1862 Crustaceans 2934 species Molluscs 3370 species Echinoderms 765 species Hard Corals 218 species Fishes 2546 species Environmental Management Framework for ENCORE Program, 2019. Vol I iii Attributes Details Reptiles 5 sea turtle species 26 sea snake species Marine Mammals 25 reported from Indian waters 3 species of cetaceans: Irrawaddy dolphin, Ganges River Dolphin and Sperm whale; Dugong listed in Schedule I of Wildlife Act 1972 Marine Fisheries No. of Marine Fishing Villages 3288 Fishermen Population About 4 million comprising in 864,550 families Number of Fishing Harbours Major fishing harbours: 6 Minor fishing harbours: 40 Number of Fish Landing Centres 1511 Estimated marine Fish Landing 38,20,207 tonnes (2011) Fishing crafts 194,490 crafts mechanized: 37% motorized: 37% non-motorized: 26% Ports and Harbours Major Ports 13 State wise number of ports (major/ Gujarat: 40 intermediate/ minor) Maharashtra: 53 Goa: 5 Daman & Diu: 2 Karnataka: 10 Kerala: 13 Lakshadweep Islands: 10 Tamil Nadu: 15 Puducherry: 1 Andhra Pradesh: 12 Odisha: 2 West Bengal: 1 Andaman & Nicobar Islands: 23 Profile of the Participating States ENCORE is a multi-state and multi-sectoral project. It is spread over a wide geographical area and has a large number of direct beneficiaries. A description for each of the coastal states is provided in this section. Baseline Scenario of Gujarat State The state of Gujarat has a large number of key ports and coastal settlements along its 1,600 km coastline. It serves as the gateway for importing petroleum, gas and other bulk goods to North India. Gujarat has the largest share (at 23%) of the total Indian coastline. The width of its coastal tract varies from 7 to 15 km. Environmental Management Framework for ENCORE Program, 2019. Vol I iv Figure A:3 Districts of Gujarat The Gujarat coast has a high diversity of terrain, shelf depths and hydrology. Some parts of the coast are extremely flat and low lying. The highest tidal ranges in the Indian coast are witnessed in the Gulf of Khambhat (up to 8 m). These characteristics can amplify storm surges and impact wide stretches unlike many other coastal regions of India. Two cyclone seasons are experienced in Gujarat: March to July (advancing southwestern monsoon) and September to November (retreating monsoon). Maximum wind speed class of >200km/h (100-year return period) have been observed along the Saurashtra coast, specifically in Porbandar, Jamnagar and Junagadh districts which are exposed to the highest intensity of cyclonic and storm impact. The 182 -200 km/h sub-class extends further inland to cover much of Jamnagar, part of Rajkot, Junagadh and Kachchh districts. About 90,000 houses mostly in Biomass spread over 1300 settlements are vulnerable to severe damages due to 100-year return period cyclones. A simulation of storm surge along the Gujarat coast substantiated by field work and observations indicate an estimated 291 settlements are prone to storm surges of various intensities along the Gujarat coast. Environmental Management Framework for ENCORE Program, 2019. Vol I v Figure A:4 Coastal Districts and Taluks of Gujarat Table A:2 Key Statistics of Gujarat State GUJARAT Attributes Details Geographic location Latitude: 20°10′ N to 24°56′00″ N Longitude: 68°42′03″ E to 74°38′13″ E Geographic area 1,96,024 km2 Forest area 21899.49 km² Reserve Forest 14594.92 km² Protected Forest 2884.11 km² Coastline 1214.7 km Average Annual Rainfall 33 to 152 cm Demographic Indicators Total Population 6.04 million (Census 2011) Rural Population 3.46 million Urban Population 2.58 million Population Density 308 persons/km2 Literacy rate 78.03% (Census 2011) Administrative information No. of districts 33 No. of subdivisions 225 Environmental Management Framework for ENCORE Program, 2019. Vol I vi GUJARAT Attributes Details No. of towns 348 No. of Taluks 250 No. of cities 30 No. of villages 18225 No. of fishing villages 247 Ports and Harbours Major Ports 1 Minor/ Intermediate Ports 7 Mineral Resources Natural gas, Limestone, Bauxite, Calcite, Gypsum, Quartz, Silica Sand, Dolomite, steatite Ramsar Sites 1 National parks 4 Wildlife Sanctuaries 23 Bird Sanctuaries 6 Biosphere Reserve 3 Archaeological sites 43 World Heritage sites (UNESCO) 3 Islands(Inhabited/uninhabited) 183 Tourism No of tourist spots 35 Average annual tourist 44.8 million (as of 2017) No of Beaches 77 Types of Coast Sandy (%) 5% Soft Rock(%) 42% Muddy(%) 53% Natural Disasters (1975 till date) Cyclones 3 Floods 3 Earthquakes 1 Fishery Resources Continental Shelf area 184000 km2 Total inland water bodies (lakh 4.26 Lakh ha Ha) Marine/Inland Fish Landings 695.58 MT / 97.84 MT (as of 2013 – 14) Fish Landing centres 121 Coastal area Geographical Area 133495.77 km2 No. of districts 17 No. of Taluks 107 No of Villages 4987 ESA (Coastal/Marine) 7094.19 km2 (95%, 5%) Mangroves 1421.33 km2 Corals 369.92 km2 Environmental Management Framework for ENCORE Program, 2019. Vol I vii GUJARAT Attributes Details Seagrass 17.02 km2 Salt Marsh 283.74 km2 Turtle Nesting Ground 4.00 km2 Bird Nesting Site 9.82 km2 Sand Dune 66.5 km2 Mudflat 2980.63 km2 Protected Area 1 km2 Archaeological & Heritage 1.98 km2 Baseline Scenario of Maharashtra Maharashtra, located in the north centre of India along the west coast, is the second largest state in terms of population and the third largest in terms of area and is spread over 307,713 square km. Maharashtra has the country's second largest urban population and is about 43% urbanized. Mumbai , Maharashtra’s capital city is the principal financial centre and a major commercial hub of the country. The Sahyadri mountain range (Western Ghats) rises to an average elevation of 1000m. It falls in steep cliffs, to the Konkan on the west. Owing to this mountain range and its topography, the coastal part of the state, west of the Sahyadri is prone to heavy rainfall while the eastern part is dry. Maharashtra is prone to a host of hazards. It is at moderate risk to Cyclones and storms. During the period from 1890 to 1995, 210 cyclonic depressions were recorded in the Arabian Sea. Out of these 19 (including 6 major ones) affected the Maharashtra -Goa coast. The Konkan region lies in the cyclone moderate to low damage risk zone since wind speeds rarely exceed 155km/h. Heavy urbanization has also increased vulnerability to hazards like urban flooding. Environmental Management Framework for ENCORE Program, 2019. Vol I viii Figure A:5 Districts of Maharashtra Figure A:6 Coastal Districts and Taluks of Maharashtra Environmental Management Framework for ENCORE Program, 2019. Vol I ix Table A:3 Key Statistics of Maharashtra State MAHARASHTRA Attributes Details Latitude: 15°35′06″ N to 22°03′10″ N Geographic location Longitude: 72 °36′03″ E to 80°54′11″ E Geographic area 307713 km2 Forest area 61939 km² Reserve Forest 49222.92 km² Protected Forest 8194.53 km² Coastline 652.6 km Average Annual Rainfall 1600 to 2000 mm Demographic Indicators Total Population 112.40 million (Census 2011) Rural Population 61.60 million Urban Population 50.80 million Population Density 365 persons/km2 Literacy rate 82.30% (Census 2011) Administrative information No. of districts 36 No. of subdivisions 259 No. of towns 371 No. of Taluks 358 No. of cities 27 No. of villages 55393 Ports and Harbours Major Ports 2 Minor/ Intermediate Ports 14 Iron ore, Coal, Manganese, Limestone, Dolomite, Kyanite, Mineral Resources Silica sand and Sillimanite National parks 6 Wildlife Sanctuaries 42 Bird Sanctuaries 3 Archaeological sites 22 World Heritage sites 5 (UNESCO) Islands(Inhabited/uninhabited) 173 Tourism No of tourist spots 42 Average annual tourist 11.4 million (as of 2011) No of Beaches 108 Types of Coast Environmental Management Framework for ENCORE Program, 2019. Vol I x MAHARASHTRA Attributes Details Sandy (%) 17% Hard Rock(%) 37% Muddy(%) 46% Natural Disasters (1975 till date) Floods 1 Earthquakes 1 Fishery Resources Continental Shelf area 112000 km2 Total inland water bodies (lakh 3.48 Lakh ha Ha) Marine/Inland Fish Landings 423.79 MT / 124.95 MT (as of 2014 – 15) Fish Landing centres 162 Coastal area Geographical Area 34109.12 km2 No. of districts 7 No. of Taluks 50 No of Villages 2573 ESA (Coastal/Marine) 811.46 km2 (99.97%, 0.03%) Mangroves 317.24 km2 Corals 0.18 km2 Seagrass Nil Salt Marsh 4.55 km2 Turtle Nesting Ground 2.02 km2 Bird Nesting Site 0.22 km2 Sand Dune 4.11 km2 Mudflat 46.97 km2 Protected Area 435.15 km2 Archaeological & Heritage 1.02 km2 Baseline Scenario of Goa Goa is the smallest state of India by area located on the west coast. It is a well-known national and international tourist destination due to its scenic beauty, abundant greenery, attractive beaches, temples, churches, architectural splendour, wild life sanctuaries, colourful and lively feasts and festivals. To facilitate revenue administration, North Goa is divided into four Sub-Divisions namely Panaji, Bicholim, Mapusa and Ponda and South Goa is divided into five Sub-Divisions namely Margao, Quepem and Sanguem, Mormugao, Canacona and Dharbandora. The population density of the state is about 394 persons / km2 which is higher than the national average 382 persons/sq km. There are seven major rivers in the state namely Zuari, Mandovi, Terekhol, Chapora, Galgibag, Kumbarjua canal, Talpona and the Sal. The Zuari and the Mandovi are the most important rivers, interspaced by the Kumbarjua canal, forming a major estuarine complex. The total navigable length of Goa rivers is Environmental Management Framework for ENCORE Program, 2019. Vol I xi 253 km (157 mi). There are about 300 ancient water-tanks built during the rule of the Kadamba dynasty and over 100 medicinal springs. Most of Goa's soil cover is made up of laterites rich in ferric-aluminium oxides and reddish in colour. Further inland and along the riverbanks, the soil is mostly alluvial and loamy. The soil is rich in minerals and humus, thus conducive to agriculture. Some of the oldest rocks in the Indian subcontinent are found in Goa between Molem and Anmod on Goa's border with Karnataka. The rocks are classified as Trondjemeitic Gneiss estimated to be 3,600 million years old, dated by rubidium isotope dating. The Western Ghats, which form most of eastern Goa, have been internationally recognized as one of the biodiversity hotspots of the world. In the February 1999 issue of National Geographic Magazine, Goa was compared with the Amazon and the Congo basins for its rich tropical biodiversity. Goa's wildlife sanctuaries boast of more than 1512 documented species of plants, over 275 species of birds, over 48 kinds of animals and over 60 genera of reptiles. Figure A:7 Districts and Taluks of Goa Agriculture is the major occupation of about 70% of the population. Goa is also known for its coconut cultivation. Fishing is the second largest occupation in the state. There are many major and minor fish landing centres such as Betim (Malim) Chapora, Khariwado, Cutbona, and Betul. The state hosts Fish Festival “Aqua Goa” for three days is being conducted in the State to create awareness about fisheries and sea food. The event provides a platform for entrepreneurs/Fishermen/farmers from all over the State to exhibit their products. Environmental Management Framework for ENCORE Program, 2019. Vol I xii Table A:4 Key Statistics of Goa GOA Attributes Details Latitude: 14°53′54″ N to 15°40′00″ N Geographic location Longitude: 73°40′33″ E to 74°20′13″ E Geographic area 3072 Sq.km Forest area 1424 Sq.km Coastline 131 km Average Annual Rainfall 2813 mm Demographic Indicators Total Population 14.59 Lakhs (as of 2014) Rural Population 9.07 Lakhs Urban Population 5.52 Lakhs Population Density 394 persons/sq km Literacy rate 88.7% Administrative information No. of Districts 2 No. of Subdivisions 9 No. of Towns 70 No. of Taluks 12 No of Gram Panchayats 189 No. of Cities 14 Number of villages (including 334 Uninhabited villages) Ports and Harbours Major Ports 1 Minor/ Intermediate Ports 5 Mineral Resources Iron Ore, Manganese, Bauxite, Basalt, Laterite, rubbles National parks 1 Wildlife Sanctuaries 6 Bird Sanctuaries 1 Archaeological sites 51 World Heritage sites 1 (UNESCO) Islands(Inhabited/uninhabited) 19 Tourism No of tourist spots 19 Average annual tourist 5.04 million ( as of 2014) No of Beaches 39 Types of Coast Sandy 33% Environmental Management Framework for ENCORE Program, 2019. Vol I xiii GOA Attributes Details Rocky 67% Natural Disasters (1975 till date) Floods 2 Landslides 6 Fishery Resources Continental Shelf area 10000 sq. km Total inland water bodies (lakh 3.48 Ha) Marine/Inland Fish Landings 144.28/5.33 thousand tonnes as of 2017 Fish Landing centres 29 Coastal area Geographical Area 133495.77 km2 No. of districts 2 No. of Taluks 14 No of Villages 239 ESA 41.89 km2 (99.1%, 0.9%) Mangroves 32.88 km2 Corals 0.34 km2 Seagrass Nil Salt Marsh 1.06 km2 Turtle Nesting Ground 0.26 km2 Bird Nesting Site Nil Sand Dune 2.94 km2 Mudflat 1.05 km2 Protected Area 2.83 km2 Archaeological & Heritage 0.53 km2 Environmental Management Framework for ENCORE Program, 2019. Vol I xiv Baseline Scenario of Karnataka Karnataka is one of the coastal states in the south western side of peninsular India. Karnataka is bordered by the Arabian Sea to the west, Goa to the northwest, Maharashtra to the north, Telangana to the northeast, Andhra Pradesh to the east, Tamil Nadu to the southeast, and Kerala to the south. The state covers an area of 191,791 square kilometres or 5.83 percent of the total geographical area of India. Figure A:8 Districts of Karnataka Environmental Management Framework for ENCORE Program, 2019. Vol I xv It is the sixth largest Indian state by area. With 61,130,704 inhabitants at the 2011 census, Karnataka is the eighth largest state by population, comprising 30 districts. The river systems of the state are the Krishna and its tributaries, the Bhima, Ghataprabha, Vedavathi, Malaprabha and Tungabhadra in North Karnataka Sharavathi in Shivamogga and the Kaveri and its tributaries, the Hemavati, Shimsha, Arkavati, Lakshmana Thirtha and Kabini, in the south. Figure A:9 Coastal Districts and Taluks of Karnataka Environmental Management Framework for ENCORE Program, 2019. Vol I xvi Most of these rivers flow out of Karnataka eastward, reaching the sea at the Bay of Bengal. The state has four distinct physiographic landforms such as the Northern Karnataka Plateau, the Central Karnataka Plateau, the Southern Karnataka Plateau and the Coastal Karnataka Region. The area is mainly composed of the Deccan Trap. It represents an extensive deforested plateau landscape. The Northern Karnataka Plateau has an elevation of 300 metres to 600 metres from the sea level. The plateau slopes towards the east. The landscape is mainly covered with rich black cotton soils. The elevation of the Central Karnataka Plateau varies between 450 metres and 700 metres. The general slope of this plateau is towards the east. This plateau region is covered by a high degree of slope. It is encircled by the Western Ghats on the west and the south. The Southern Karnataka Plateau has a general elevation of 600 metres to 900 metres. The Karnataka Coastal Region includes the districts of Uttara Kannada and Dakshina Kannada. The terrain of this region consists of rivers, creeks, waterfalls, ranges of hills and peaks. The Karnataka Coastal Region can be divided into two main geographical divisions, known as the Western Ghats and the plains. The coastal belt has an average width of 50 km to 80 km. It covers a distance of around 267 km from north to south. Karnataka has 26 east flowing rivers and 10 west flowing rivers. The west flowing rivers of Karnataka flow to the Arabian Sea. These west-flowing rivers are responsible for providing 60% of the state’s inland water resources. The State has 60% (114 lakh ha) cultivable land and 72% of the cultivable area is rainfed and 28% is under irrigation. The State has 10 Agro climatic Zones. The Red soil constitutes a major soil type, followed by Black soil. The net sown area of the State constituted 51.7% of the total land. Discontinues coastal stretches from Karwar to Honnebali of north Karnataka experiences erosion while the other stretches indicate stable and low accretion. Table A:5 Key Statistics of Karnataka State KARNATAKA Attributes Details Latitude: 11°30’ to 18°25’ N Geographic location Longitude: 74°10’ to 78°35’E Geographic area 1,91,791 Sq. Km Forest area 43,382.76 Sq. km Coastline 280 km 2000-3200 mm in Western Ghats Average Annual Rainfall 400-500 mm in other parts Demographic Indicators Total Population 6.11 million (as of 2011) Rural Population 3.75 million Urban Population 2.36 million Population Density 320 persons/km2 Literacy rate 75.36% (Census 2011) Administrative information No. of districts 30 No. of subdivisions 4 No. of towns 347 Environmental Management Framework for ENCORE Program, 2019. Vol I xvii KARNATAKA Attributes Details No. of Taluks 176 No. of cities 274 Number of villages (including 29,340 Uninhabited villages) No of village Panchayats 6019 Ports and Harbours Major Ports 1 Minor/ Intermediate Ports 10 Asbestos, Bauxite, Dolomite, Gold, Iron Ore, Kaolin, Limestone, Mineral Resources Magnesite, Manganese, Ochre, Quartz And Granite, Kyanite, Silver, Feldspar, Mica,Silica Sand, Felsite, Chromite National parks 5 Wildlife Sanctuaries 30 Bird Sanctuaries 11 Archaeological sites 25 World Heritage sites 2 (UNESCO) Islands(Inhabited/uninhabited) 124 Tourism No of tourist spots 42 Average annual tourist 85 million ( as of 2015 – 16) No of Beaches 46 Types of Coast Sandy (%) 68% Hard Rock(%) 32% Natural Disasters (1975 till date) Floods 2 Earthquakes Few minor (2.5 - 3 Richter scale) Fishery Resources Continental Shelf area 27000 Sq. km Total inland water bodies (lakh 5.65 lakh Ha Ha) Marine/Inland Fish Landings 411762 MT/168828 MT (as of 2014 – 15) Fish Landing centres 26 Coastal area Geographical Area 19938.94 km2 No. of districts 3 No. of Taluks 28 Environmental Management Framework for ENCORE Program, 2019. Vol I xviii KARNATAKA Attributes Details No of Villages 752 ESA 142.18 km2 Mangroves 16.47 km2 Corals 0.16 km2 Seagrass Nil Salt Marsh 0.56 km2 Turtle Nesting Ground Nil Bird Nesting Site 0.35 km2 Sand Dune 0.47 km2 Mudflat 0.81 km2 Protected Area 123.07 km2 Archaeological & Heritage 0.29 km2 Baseline Scenario of Kerala Kerala has a geographical area of 38,863 sq km. It lies between the Arabian Sea on the west and the Western Ghats on the east. Kerala’s coast runs 560 km in length, while the state itself varies between 35 –120 km in width. Kerala receives an average annual rainfall of 3,107 mm mostly through seasonal monsoons and averages 120 – 140 rainy days per year. The excessive rainfall that the state receives every season, including from tropical cyclones, makes Kerala prone to severe landslides, flooding and coastal erosion. The density of coastal urban population is 4,228 persons per square km, nearly twice the average urban density in the state. This puts a huge number of coastal communities at risk, exposing them to multiple natural hazards. Continuous occurrence of high intensity rainfall within a few days is the primary factor contributing to extreme floods in the State. Between 1891 to 2007, 31 Cyclonic Storms / Severe Cyclonic Storms have affected the Kerala coast. During the past 35 years, Kerala has seen 2 severe Cyclonic Storms that originated over the Bay of Bengal, crossed the eastern coast of India and re-emerged into the Arabian Sea as a depression. Cyclones are usually accompanied by tidal waves which, on occasion, enter land up to a distance of 10 km, along with heavy rains and winds with speeds exceeding 50 km/h. People residing in habitat ions within a distance of 5 km from the sea coast are generally the worst affected with the inundation (varying between approximately 2.5 to 5 m) lasting for over 5-6 days. The Kerala coast was significantly affected by the 2004 Indian Ocean tsunami with maximum damages reported in the low coastal land of Kollam, Alleppey and Ernakulam districts. Environmental Management Framework for ENCORE Program, 2019. Vol I xix Figure A:10 Districts of Kerala Environmental Management Framework for ENCORE Program, 2019. Vol I xx Figure A:11 Coastal Districts and Taluks of Kerala Environmental Management Framework for ENCORE Program, 2019. Vol I xxi Table A:6 Key Statistics of Kerala State KERALA Attributes Details Latitude: 8°52′11″ N to 12°46′21″ N Geographic location Longitude: 74 °52′23″ E to 77°47′14″ E Geographic area 38863 km2 Forest area 11309.50 km² Coastline 569.7 km Average Annual Rainfall 3107 mm Demographic Indicators Total Population 3.34 million (Census 2011) Rural Population 1.75 million Urban Population 1.59 million Population Density 860 persons/km2 Literacy rate 94.01% (Census 2011) Administrative information No. of districts 14 No. of subdivisions 27 No. of towns 422 No. of Taluks 62 No. of cities 14 No. of villages 1453 No. of Gram Panchayats 1007 No of fishing villages 222 Ports and Harbours Major Ports 1 Minor/ Intermediate Ports 18 Ilmenite, Rutile, Zircon, Monazite, Sillimanite), Gold, Iron ore, Mineral Resources Bauxite, Graphite, China Clay, Fire Clay, Tile and Brick Clay, Silica Sand, Lignite, Limestone, Granite, Gemstones National parks 6 Wildlife Sanctuaries 14 Bird Sanctuaries 8 Biosphere Reserve 2 Archaeological sites 31 Islands(Inhabited/uninhabited) 113 Ramsar Site 3 Tourism No of tourist spots 42 Average annual tourist 1.58 million (as of 2017) Environmental Management Framework for ENCORE Program, 2019. Vol I xxii KERALA Attributes Details No of Beaches 67 Types of Coast Sandy 45% Hard Rock 5% Muddy 15% Seawalls 35% Natural Disasters (1975 till date) Floods 2 Earthquakes 1 Fishery Resources Continental Shelf area 41000 km2 Total inland water bodies (lakh 6.93 Lakh ha Ha) Marine/Inland Fish Landings 3.49 MT / 6.58 MT (as of 2014 – 15) Fish Landing centres 189 Coastal area Geographical Area 23276.94 km2 No. of districts 9 No. of Taluks 45 No of Villages 894 ESA 22.84 km2 Mangroves 21.12 km2 Corals Nil Seagrass Nil Salt Marsh Nil Turtle Nesting Ground 1.17 km2 Bird Nesting Site Nil Sand Dune Nil Mudflat Nil Protected Area 0.37 km2 Archaeological & Heritage 0.18 km2 Baseline Scenario of Tamil Nadu This is the southernmost state of India and is bordered by Kerala to the west, Karnataka to the northwest, Andhra Pradesh to the north, the Bay of Bengal to the east and the Indian Ocean to the south. Tamil Nadu is the eleventh largest state in India and covers an area of 130,058 square kilometres. Tamil Nadu is the only state in India which has both the Western Ghats and the Eastern Ghats mountain ranges which meet at the Nilgiri hills. The Western Ghats dominate the entire western border with Kerala, effectively blocking much of the rain bearing clouds of the South West Monsoon from entering the state. Environmental Management Framework for ENCORE Program, 2019. Vol I xxiii The eastern parts are fertile coastal plains. The northern parts are a mix of hills and plains. The central and south-central regions are arid plains. The state's economy is largely agriculture-based and 70% of the population is involved in this industry. Tamil Nadu constitutes 4 percent of India’s land area and is inhabited by 6 percent of India’s population, but has only 2.5 percent of India’s water resources. More than 95 percent of the surface water and 80 percent of the ground water have already been put into use. Figure A:12 Districts of Tamil Nadu Environmental Management Framework for ENCORE Program, 2019. Vol I xxiv Figure A:13 Coastal Districts and Taluks of Tamil Nadu Environmental Management Framework for ENCORE Program, 2019. Vol I xxv Major uses of water include human/animal consumption, irrigation and industrial use. There are 17 river basins in Tamil Nadu. Cauvery is the only major basin. Of the others, 13 basins are medium and 3 are minor river basins. Forest Cover of the State is 26,345 sq.km which is 20.26% of the State’s geographical area. The State has been a victim of natural calamities such as cyclones, tsunamis and floods in some years and severe drought in certain years. According to the National Institute of Disaster Management, 13 districts of Tamil Nadu are vulnerable to high or very high cyclonic impact and flooding. Table A:7 Key Statistics of Tamil Nadu State TAMIL NADU Attributes Details Latitude: 8°00′00″ N to 13°50′00″ N Geographic location Longitude: 76°40′00″ E to 80°10′00 E Geographic area 130058 sq.km Forest area 26,345 sq.km Coastline 906.9 km Average Annual Rainfall 930 mm Demographic Indicators Total Population 72.14 million (2011 Census) Rural Population 37.19 million Urban Population 34.95 million Population Density 277 Literacy rate 80.33% Administrative information No. of Districts 32 No. of Subdivisions 82 No. of Towns 561 No. of Taluks 285 No. of Cities 5 No. of Villages 17680 Gram Panchayats 12618 Tribal districts 5 Municipality (M) 125 Ports and Harbours Major Ports 3 Minor/ Intermediate Ports 17 Mineral Resources Lignite, vermiculite, dunite, garnet, molybdenum, titanium National parks 5 Wildlife Sanctuaries 15 Bird Sanctuaries 15 Tiger Reserve 4 Archaeological sites 47 World Heritage sites 4 (UNESCO) Environmental Management Framework for ENCORE Program, 2019. Vol I xxvi TAMIL NADU Attributes Details Ramsar Site 1 Islands(Inhabited/uninhabited) 74 Tourism No of tourist spots 42 Average annual tourist 16.3 million ( as of 2014 – 15) No of Beaches 62 Types of Coast Sandy 57% Hard Rock 5% Muddy 38% Natural Disasters (1975 till date) Cyclones 5 Floods 2 Earthquakes 1 Tsunami 1 Oil Spill 1 Fishery Resources Continental Shelf area 41000 sq km Total inland water bodies (lakh 3.73 Ha) Marine/Inland Fish Landings 7 Lakh MT / 4.5 Lakh MT Fish Landing centres 363 Coastal area Geographical Area 55344.66 km2 No. of districts 13 No. of Taluks 82 No of Villages 4139 ESA 2215.99 km2 Mangroves 119.10 km2 Corals 23.30 km2 Seagrass 398.80 km2 Salt Marsh 59.40 km2 Turtle Nesting Ground 2.63 km2 Bird Nesting Site 595.45 km2 Sand Dune 30.83 km2 Environmental Management Framework for ENCORE Program, 2019. Vol I xxvii TAMIL NADU Attributes Details Mudflat 189.43 km2 Protected Area 796.16 km2 Archaeological & Heritage 0.79 km2 Baseline Scenario of Andhra Pradesh The geographical area of the state is about 2,75,069 sq km which constitutes 8.4% of India’s total land area. The state has 3 distinct physiographic regions such as hilly regions and eastern ghats ranging from 500m to 3000m, the plateau having an altitude range of 100m to 1000m and the deltas of rivers between the eastern ghats and seacoast. As per the records of the forest department 23.20% of the geographical area is covered with forest, of which 3.08% is under protected area network. Nagarjunasagar Srisailam, the largest tiger reserve of the country is located in the state covering about 0.36 million hectares. Andhra Pradesh economy is mainly based on agriculture and livestock. Four important rivers of India, the Godavari, Krishna, Pennar and Thungabhadra flow through the state and provide irrigation. 60 percent of the population is engaged in agriculture and related activities. Fisheries contribute 10% of total fish and over 70% of the shrimp production of India. The geographical location of the state allows marine fishing as well as inland fish production. Andhra Pradesh is exposed to cyclones, storm surges, floods and drought. Figure A:14 Districts of Andhra Pradesh Environmental Management Framework for ENCORE Program, 2019. Vol I xxviii A moderate to severe intensity cyclone can be expected to make landfall every two to three years. About 44 percent of the state is vulnerable to tropical storms and related hazards. More than 60 cyclones have affected the state this century as per the records of IMD. The incidence of cyclones seems to have increased in the past decades, to the extent that severe cyclones have become a common event occurring every two to three years, repeatedly and severely affecting the state's economy while challenging its financial and institutional resources. Almost 9 million people are vulnerable to cyclones and their effects in Coastal AP, 3.3 million of who belong to communities located within 5 km of the seashore. The Godavari and the Krishna rivers have well-defined stable courses, and their natural and man-made banks have usually been capable of carrying flood discharges, with the exception of their delta areas. Traditionally, the flood problem in AP had been confined to the spilling of smaller rivers and the submersion of marginal areas surrounding Kolleru Lake. However, the drainage problem in the delta zones of the coastal districts has worsened, thereby multiplying the destructive potential of cyclones and increasing flood hazards. As per the recent study of country’s erosion study using high resolution aerial data by NCSCM, 17% of the state’s coastline undergo erosion. Figure A:15 Coastal Districts and Taluks of Andhra Pradesh The coastal stretches of the two major deltas, the Krishna and the Godavari were the most affected coastal areas for this human induced disaster. The deadliest cyclone in the past 40 years was the one that struck Andhra's coast in November 1977, killing about 10,000 people. About 250,000 cattleheads perished, one million houses were damaged and crops on 1.35 million hectares (ha) were destroyed that year. According to the State Disaster Management Department, about 44 per cent of the state is vulnerable to tropical storms and related disasters. Vulnerability to storm surges is not uniform along the coast of Andhra. The stretch between Nizampatnam in Guntur district and Machilipatnam in Krishna district is the most prone to storm surges. East and West Godavari districts, with vast stretches of paddy Environmental Management Framework for ENCORE Program, 2019. Vol I xxix fields and irrigation, drainage canals always bear the brunt of cyclones accompanied by strong winds and pounding rains. In the aftermath of cyclones, these areas get flooded, leading to huge crop losses besides other damage. Table A:8 Key Statistics of Andhra Pradesh State ANDHRA PRADESH Attributes Details Latitude: 12°41′00″ N to 19°07′00″ N Geographic location Longitude: 77°50′00″ E to 84°40′00 E Geographic area 275069 sq.km Forest area 63,814 sq.km Coastline 973.7 km Average Annual Rainfall 930 mm Demographic Indicators Total Population 53.06 million (as of 2011) Rural Population 35.36 million Urban Population 17.70 million Population Density 308 persons/km2 Literacy rate 67.41% (Census 2011) Administrative information No. of Districts 13 No. of Subdivisions 50 No. of Towns 104 No. of Taluks 671 No. of Cities 31 No. of Villages 28293 Gram panchayats 21843 No. of Fishing Villages 555 Ports and Harbours Major Ports 1 Minor/ Intermediate Ports 14 Mica, Limestone, Asbestos, Iron ore, Manganese, Silica sand, Mineral Resources Oil and natural gas National parks 5 Wildlife Sanctuaries 13 Bird Sanctuaries 3 Biosphere Reserve 3 Archaeological sites 40 Ramsar Site 1 Islands(Inhabited/uninhabited) 72 Tourism No of tourist spots 83 Environmental Management Framework for ENCORE Program, 2019. Vol I xxx ANDHRA PRADESH Attributes Details Average annual tourist 121.8 million (2015-16) No of Beaches 75 Types of Coast Sandy 38% Hard Rock 3% Muddy 52% Marshy 7% Natural Disasters (1975 till date) Floods 2 Cyclones 60 (in last 4 decades) Tsunami 1 Typhoon 1 Heat Waves 1 Fishery Resources Continental Shelf area 33227 sq km Total inland water bodies (lakh 11.25 Lakh Ha Ha) Marine/Inland Fish Landings 4.8 Lakh MT / 14.89 Lakh MT (2015-16) Fish Landing centres 353 Coastal area Geographical Area 101610.39 km2 No. of districts 9 No. of Taluks 84 No of Villages 2694 ESA 3245.55 km2 Mangroves 507.29 km2 Corals Nil Seagrass Nil Salt Marsh 26.08 km2 Turtle Nesting Ground 13.75 km2 Bird Nesting Site 264.93 km2 Sand Dune 115.94 km2 Mudflat 7.13 km2 Protected Area 2310.30 km2 Archaeological & Heritage 0.13 km2 Environmental Management Framework for ENCORE Program, 2019. Vol I xxxi Baseline Scenario of Odisha The State of Odisha (Orissa) is located on the eastern coast of India at 17°51′00″ N to 22°53′00″ N Latitude &81°37′00″ E to 87°53′00 E Longitude carved out of Bihar in 1936. The state is bordered by Madhya Pradesh in the west, Andhra Pradesh in the south, West Bengal in north-east, Bay of Bengal in the east and Bihar in the north, the state extends to an area of 1,55,707 Sq. Km and Population (Census,2011) of 45,987,358.The climate of the state is tropical with 1451mm average rainfall. This is one of the densely populated states in India and is divided into 30 districts, of which Mayurbhanj is the biggest (1042km2) and Jagatsinghpur the smallest (197km2) by area. The districts are subdivided into 317 CD Blocks or taluks and 58 subdivisions. There are 58 sub- divisions and 171 tahasils. According to the 2001 census, there are 49694 villages and 6234 Gram Panchayats. Apart from other Population statistics, the Literacy rate in Odisha has witnessed major growth and has increased to 73.45 percent according to 2011 against 63.08% in the 2001 census. The State has a total forest area of 61204 km2, which is about 37% of its geographical area. The Department of Forest and Environment manages 26,350 km2 of Reserve forests area (RFs) under various working plans and schemes while 34,854 km2 are Demarcated Protected Forests (DPFs) and Undemarcated Protected Forests (UDPFs) and other forests. Figure A:16 Districts of Odisha Odisha is drained by 11 major rivers and their tributaries separated by high ridges. The Odisha Coastal Plains are the depositional landforms of recent origin and geologically belong to the Post-Tertiary Period. The 75 metre contour line delimits their western boundary and differentiates them from the Middle Mountainous Region. This region stretches from the West Bengal border, i.e. from the River Subarnarekha in the north to the River Rushikulya in the south. Port of Paradip is one of the major Environmental Management Framework for ENCORE Program, 2019. Vol I xxxii ports in the east coast shore and situated at the confluence of river Mahanadi and the Bay of Bengal. Tourism in Odisha are noted for sculptural and artistic heritage and has long been famous to scholars and connoisseurs for the magnificent Sun Temple at Konark (The legendary 'Black Pagoda' of European mariners), for the majestic temple of Lord Jagannath at Puri (renowned for the spectacular Rath Yatra chariot festival), and for the glorious temples of Bhubaneswar. Beaches at Puri and Gopalpur on sea attracts both national and international tourists. Figure A:17 Coastal Districts and Taluks of Odisha Gahirmatha Marine Sanctuary extending from Dhamra River mouth in the north to Brahmani river mouth in the south is the world's largest nesting beach for Olive Ridley Turtles extending to an area of about 1,435 km². The state is one of the high multi-disaster prone areas of the country. The state falls victim for most of the tropical cyclones, storm surges that occur in Bay of Bengal due to its sub-tropical littoral location. Fani cyclone is the second extremely strongest cyclone since Phailin in 2013 affected about 1.6 crore people in the state in May 2019. Its densely populated coastal plains are the alluvial deposits of its river systems. The rivers in these areas with a heavy load of silt have very little carrying capacity, resulting in frequent floods, only to be compounded by breached embankments. Though a large part of the state comes under Earthquake Risk Zone-II (Low Damage Risk Zone), the Brahmani Mahanadi graben and their deltaic areas come under Earthquake Risk Zone-III (Moderate Damage Risk Zone) covering 43 out of the 103 urban local bodies of the state. Besides these natural hazards, human-induced disasters such as accidents, stampede, fire, etc, vector borne disasters such as epidemics, animal diseases and pest attacks and industrial/chemical disasters add to human suffering. Environmental Management Framework for ENCORE Program, 2019. Vol I xxxiii Table A:9 Key Statistics of Odisha State ODISHA Attributes Details Latitude: 17°51′00″ N to 22°53′00″ N Geographic location Longitude: 81°37′00″ E to 87°53′00 E Geographic area 155707 sq.km Forest area 61204.17 sq.km Coastline 476.4 km Average Annual Rainfall 1451.2 mm Demographic Indicators Total Population 45.99 million (2017) Rural Population 38.31 million Urban Population 7.68 million Population Density 300 Literacy rate 73.45% Administrative information No. of Districts 30 No. of Subdivisions 58 No. of Towns 42 No. of Taluks 317 No. of Cities 5 No. of Villages 49694 No of Gram Panchayats 6234 No of Fishing Villages 3878 (813 /3065) (Marine/Inland) Ports and Harbours Major Ports 1 Minor/ Intermediate Ports 12 Mineral Resources Chromite, Nickel, Bauxite, Iron ore, Coal National parks 2 Wildlife Sanctuaries 19 Bird Sanctuaries 2 Biosphere Reserve 1 Archaeological sites 6 World Heritage sites 1 (UNESCO) Ramsar Site 2 Islands(Inhabited/uninhabited) 35 Tourism No of tourist spots 20 Average annual tourist 1.42 million (2017 -18) Environmental Management Framework for ENCORE Program, 2019. Vol I xxxiv ODISHA Attributes Details No of Beaches 32 Types of Coast Sandy 66% Muddy 34% Natural Disasters (1975 till date) Cyclones 5 Floods 4 Earthquakes (3 – 6 Richter 6 scale) Heat Waves 12 Tsunami (Dec 2004) 1 Landslides 9 Lightning 9 Fishery Resources Continental Shelf area 24000 sq km Total inland water bodies (lakh 4.18 Ha) Marine/Inland Fish Landings 1.10 Lakh MT / 0.60 Lakh MT (2016 -17) Fish Landing centres 72 Coastal area Geographical Area 25827.46 km2 No. of districts 6 No. of Taluks 12 No of Villages 5001 ESA 2606.85 km2 Mangroves 264.63 km2 Corals Nil Seagrass 87.08 km2 Salt Marsh 131.69 km2 Horseshoe Crab Habitat 29.33 km2 Turtle Nesting Ground 8.73 km2 Bird Nesting Site 730.96 km2 Sand Dune 96.82 km2 Mudflat 70.21 km2 Protected Area 1187.32 km2 Archaeological & Heritage 0.08 km2 Environmental Management Framework for ENCORE Program, 2019. Vol I xxxv Baseline Scenario of West Bengal Figure A:18 Districts of West Bengal Environmental Management Framework for ENCORE Program, 2019. Vol I xxxvi West Bengal is bounded on the north by Sikkim and Bhutan, on the east by Assam and Bangladesh, on the south by the Bay of Bengal and on the west by Odisha, Bihar and Nepal. West Bengal covers a geographical area of 88,752 sq. km, which constitutes about 2.7% of the total land area of the country. The State is divided into 23 administrative districts. The State can be divided into two distinct regions, i) the Himalayas and the Sub-Himalayas and their associated forest types in the northern parts and ii) the thickly populated Gangetic Plains, merging with the sea in the form of vast, tangled mangroves in the southern part. The climate is generally humid tropical monsoon. It varies from moist- tropical in the southeast to dry tropical in the southwest and from subtropical to temperate in the mountains of the north. The total human population of the state is 9.13 million (as per Census 2011), which is the rural population comprises 68.13 in % and urban 31.87 in %. Figure A:19 Coastal Districts and Taluks of West Bengal The population density of the state is 1028 persons per sq. km (Department of Labour- 2013-14). There are eight forest types in the State. They are Tropical Semi-evergreen, Tropical Moist Deciduous, Tropical Dry Deciduous, Subtropical Broadleaf Hill, Subtropical Pine, Himalayan Moist Temperate, Montane Wet Temperate, Littoral and Swamp Forests. The forests are mainly distributed in the north, southwest and southeast. As per the Forest Survey of India report of 2001, the total recorded forest area is 11,879 sq. km, which constitutes 13.4% of the geographical area of the State and 1.5% of the country’s forest area. By legal status, reserved forest constitutes 59.3%, protected forest 31.8% and unclassed forest 8.9% (Ministry of Environment and Forest 2001). There are five national parks and 16 wildlife sanctuaries covering an area of 0.28 million ha, constituting 3.15% of the geographical area of the State (Rodgers et al. 2000). The State has two Tiger Reserves namely, Sundarbans and Buxa, both are identified IBAs. The Sundarbans Biosphere Reserve is one of the 12 Biosphere Reserves of the country and one of the world’s largest mangrove forests spread to an area of about 140000 Ha. As per the statistics of the National Centre for Sustainable Coastal Management (NCSCM) the total mangrove cover of the wetland is about 2044.23 sq km which is about 94% of the state’s total mangrove area. The Sundarbans Environmental Management Framework for ENCORE Program, 2019. Vol I xxxvii National Park is also a World Heritage site. There are about Six national parks and all of them are identified as (Important Bird and Biodiversity Areas (IBA’s), namely Buxa National Park, G orumara National Park, Lava-Neora National Park, Sundarbans National Park and Singhalila National Park. Out of 16 wildlife sanctuaries, three have been identified as IBAs, namely Jaldapara Wildlife Sanctuary, Kulik Bird Sanctuary and Mahananda Wildlife Sanctuary. The major soil types of the state are laterite, Red soils, Alluvial Soil, Tarai Soil, Saline Soil and Red and Gravelly Soils. About 70 % of the State population is dependent on agriculture. The major crops are paddy, jute, tea, potatoes, oilseeds, betel- vine, tobacco, wheat, barley and maize. Aquaculture is also a prominent activity and West Bengal is one of the major fish producers and consumers in India. Table A:10 Key Statistics of West Bengal State WEST BENGAL Attributes Details Latitude: 21°20' and 27°32' N Geographic location Longitude: 85°50'E and 89°52' E Geographic area 88,752 sq. km Forest area 11,879 sq.km Coastline 157.5 km Average Annual Rainfall 175 cm Demographic Indicators Total Population 9.13 million (Census 2011) Rural Population 6.22 million Urban Population 2.91 million Population Density 1028 persons/sq km Literacy rate 76.26 % Administrative information No. of Districts 23 No. of Subdivisions 66 No. of Towns 252 No. of Municipalities 121 No. of Taluks/Blocks 341 No of Gram Panchayats 3349 No. of Cities 3 Number of villages (including 37, 469 Uninhabited villages) Ports and Harbours Major Ports 1 Minor/ Intermediate Ports 5 Mineral Resources Apatite, Dolomite, limestone, silica sand, wolframite National parks 6 Wildlife Sanctuaries 15 Bird Sanctuaries 1 Biosphere Reserve 1 Environmental Management Framework for ENCORE Program, 2019. Vol I xxxviii WEST BENGAL Attributes Details Archaeological sites 36 World Heritage sites 2 (UNESCO) Ramsar Site 2 Islands(Inhabited/uninhabited) 20 Tourism No of tourist spots 19 Average annual tourist 5.04 million ( as of 2014) No of Beaches 23 Types of Coast Marshy 49% Muddy 51% Natural Disasters (1975 till date) Floods 3 Cyclones 14 Fishery Resources Continental Shelf area 372,424 km² Total inland water bodies (lakh 801477.42 Ha Ha) Marine/Inland Fish Landings 178.85 MT / 1438.47 MT (as of 2014 – 15) Fish Landing centres 59 Coastal area Geographical Area 21956.02 km2 No. of districts 3 No. of Taluks 10 No of Villages 3027 ESA 8361.09 km2 Mangroves 2182.09 km2 Corals Nil Seagrass Nil Salt Marsh 32.58 km2 Horseshoe Crab Habitat 40.54 km2 Turtle Nesting Ground 2.65 km2 Bird Nesting Site 2632.31 km2 Sand Dune 2.64 km2 Mudflat 131.34 km2 Environmental Management Framework for ENCORE Program, 2019. Vol I xxxix WEST BENGAL Attributes Details Protected Area 3336.89 km2 Archaeological & Heritage 0.05 km2 Union Territories Baseline Scenario of Daman and Diu Daman and Diu is a union territory in western India. With an area of 152 km2, it is the smallest federal division of India on the mainland. The territory comprises two distinct regions Daman and Diu that are geographically separated by the Gulf of Khambhat. The state of Gujarat and the Arabian Sea border the territory. According to the 2011 census, the lowest female-to-male ratio in India (618 females per thousand males) was recorded in Daman and Diu. The entire area of Daman and Diu is distinguished as two different districts called Daman and Diu. Both these districts are located on the seashore. Both of them have borderlines with the state of Gujarat. The district of Daman is situated close to the place called Surat in the southern part of Gujarat. The district of Diu is located close to the place called Junagadh in the peninsula called Saurashtra Peninsula in Gujarat. The region of Daman is a small region in the Gulf of Khambhat. The region of Diu is connected to the state mainland by a creek. The Daman Ganga River divides Daman into two parts. Three rivers pass through the land. They are the Bhagwan River, the Kalem River and the Daman Ganga River lying in between. The district is bounded on the North by Bhagwan River, east by Valsad district of Gujarat state, south by Kalem River and on the west by the Arabian Sea. Its altitude is 12 meters above sea level. The districts Daman has an area of 112 km2, the main settlement is the city of Daman and Diu district has an area of 40 km2, the main settlement is the town of Diu. Figure A:20 Location Map of Daman and Diu Environmental Management Framework for ENCORE Program, 2019. Vol I xl The total irrigated area is 393.93 h.a. and un-irrigated area is 3304.73 hectares as per the Agricultural Census 2000-01. In 2000-01 the net area under cultivation was 3375.65 h.a. Important field and garden crops are paddy, ragi, bajra, jowar, groundnut, pulses and beans, wheat, banana, sapota, mango, chickoo, coconut and sugarcane. There are no major forests in the territory. There are 2930 small-scale and medium-scale industries in Daman and Diu. Two industrial areas have been developed by Omnibus Industrial Development Corporation at Daman. The other industrial areas are Dabhel, Bhimpore, Kachigam and Kadaiya. Table A:11 Key Statistics of Daman Diu DAMAN AND DIU Attributes Details Daman Latitude: 20°22′06″ N to 20°27′57″ N Longitude: 72°49′20″ E to 72°54′25 E Geographic location Diu Latitude: 20°42′00″ N to 20°44′34″ N Longitude: 70°52′26″ E to 71°00′24 E Geographic area Daman - 112 Sq.km Diu – 40 Sq.km Forest area 20.49 sq km Coastline 29.5 km Average Annual Rainfall 2000 mm Demographic Indicators Total Population 2.43 Lakhs (as of 2011) Rural Population 1.82 Lakhs Urban Population 60,398 Population Density 2164 persons/km2 Literacy rate 87.10% (Census 2011) Administrative information No. of Districts 2 No. of Subdivisions 1 No. of Towns 6 No. of Taluks 2 No. of Cities 2 Number of villages (including 19 Uninhabited villages) No of Fishing Villages 11 Ports and Harbours Major Ports 0 Minor/ Intermediate Ports 2 Mineral Resources Limestone Wildlife Sanctuaries 1 Bird Sanctuaries 1 Archaeological sites 12 Islands(Inhabited/uninhabited) Environmental Management Framework for ENCORE Program, 2019. Vol I xli DAMAN AND DIU Attributes Details Tourism No of tourist spots 17 Average annual tourist 0.2 million ( as of 2014 ) No of Beaches 2 Types of Coast Soft Rock Entire Natural Disasters (1975 till date) Cyclones 8 Fishery Resources Total inland water bodies 11.25 sq km Marine/Inland Fish Landings 64070 tonnes as of 2017 Fish Landing centres 7 Coastal area ESA 47.75 km2 Mangroves 5.22 km2 Corals Nil Seagrass Nil Salt Marsh 0.40 km2 Turtle Nesting Ground Nil Bird Nesting Site Nil Sand Dune 3.82 km2 Mudflat 1.88 km2 Protected Area 35.88 km2 Archaeological & Heritage 0.55 km2 Baseline Scenario of Lakshadweep Islands Lakshadweep is a tropical archipelago consisting of 12 attols, 3 reefs and 6 newly formed/ submerged sand banks in the Laccadive Sea, off the coast of Kerala, India. Lakshadweep islands are scattered in the Arabian Sea 200 to 400 km away from Malabar coast and 10 to 400 km from each other. Lakshadweep means "one hundred thousand islands" in Sanskrit and Malayalam. The islands form the smallest Union Territory of India. The Inhabited islands are Kavaratti, Agatti, Bangara, Amini, Kadmat, Kiltan, Chetlat, Bitra, Andrott, Kalpeni and Minicoy. Though, the land area of this Coral paradise is only 32 Sq.kms. the lagoon area is about 4200 Sq.Kms. of its lagoon area, 20,000 Sq.km. of territorial waters and 20000 km2 of EEZ of the country. Each island of Lakshadweep is fringed by coral sands. A common feature of these islands is that a shallow lagoon exists invariably in their western side separating the outer reef rim from low-lying coral islands composed essentially of calcareous sand and soil. The islands are generally aligned from north Environmental Management Framework for ENCORE Program, 2019. Vol I xlii to south with one exception namely, Andrott, which lies east to west. It is said that the islands and reefs were formed as a result of the coral growths over the continuation of the Aravalli system of rock of Rajasthan and Gujarat. There exist no kind of forest except thick coconut groves. Coconut is the only major crop in Lakshadweep. Fishing is another major occupation of Lakshadweep. The sea around the island is highly productive. The islands stand first in the country in per capita availability of fish. Coconut fibre extraction and fibre production is the major industry of this territory. There are few small industrial units like boat building, tuna canning, bakeries, hosiery factory, vinegar and jaggery making, flour and oil mills and furniture making etc. There are seven coir fibre production cum demonstration units and four coir curling units under the government sector. Apart from these factories, small coir units are also functioning under private ownership in different islands. Lakshadweep is a group of coral islands entirely covered by coconut trees and with lakes and lagoons. The scenic beauty of the whole islands is charming. The tourism industry is one of the major industries of these islands. Figure A:21 Lakshadweep Islands Environmental Management Framework for ENCORE Program, 2019. Vol I xliii To develop the tourism industry the Indian government takes several initiatives like water sports complex, the arrangement of fishing in the deep sea, viewing the underwater coral world in a glass bottom boat, etc. Some of the important tourist centres are Minicoy island, Bangaram island etc. Table A:12 Key Statistics of Lakshadweep Islands LAKSHADWEEP ISLANDS Attributes Details Latitude: 08°16'-13°58'N, Geographic location Longitude: 71°44°-74°24'E Geographic area 32.69 km2 Forest area 27.10 sqkm Coastline 132 km Average Annual Rainfall 1600mm Demographic Indicators Total Population 64,473 persons (as of 2011) Rural Population 14139 persons Urban Population 50334 persons Population Density 2015 persons/km2 Literacy rate 91.85% (Census 2011) Administrative information No. of Districts 1 No. of Subdivisions 10 No. of Towns 6 No. of Taluks 10 No. of Cities 1 Number of villages (including 21 Uninhabited villages) Ports and Harbours Major Ports 0 Minor/ Intermediate Ports 10 Mineral Resources Nil Bird Sanctuaries 1 Archaeological sites 1 Islands(Inhabited/uninhabited) 27 (10 / 17) Tourism No of tourist spots 15 Average annual tourist 8000 Natural Disasters (1975 till date) Cyclones 6 Fishery Resources Environmental Management Framework for ENCORE Program, 2019. Vol I xliv LAKSHADWEEP ISLANDS Attributes Details Continental Shelf area 4,336 km2 Total inland water bodies (lakh Ha) Marine/Inland Fish Landings 13.19 MT/ 0 ( as of 2014 – 15) Fish Landing centres 15 Coastal area ESA 600.08 km2 Mangroves Nil Corals 552.22 km2 Seagrass 0.72 km2 Salt Marsh Nil Turtle Nesting Ground 9.92 km2 Bird Nesting Site 37.22 km2 Sand Dune Nil Mudflat Nil Protected Area Nil Archaeological & Heritage Nil Baseline Scenario of Andaman and Nicobar Islands Andaman and Nicobar Islands is the largest archipelago system in the Bay of Bengal. It is made of two island groups: the Andaman Islands and the Nicobar Islands. Andaman and Nicobar is one of the seven union territories of India comprising 572 islands covered with lush forest. The Andaman group has 325 islands and the Nicobar group has 247 islands. For administrative purpose, it is divided into three districts North & Middle Andaman, South Andaman and Nicobar. Only 38 islands are inhabited, 11 islands in South Andaman district, 14 in North & Middle Andaman district and 13 in Nicobar district. The total geographical area of the islands is 8,250 km2. Andaman and Nicobar have a tropical climate with humidity about 80% and temperatures varying from 23°C to 31°C. The capital of Andaman and Nicobar Islands is Port Blair. As per the census of India 2011, the population density of the island is 46 persons / Sq.km. The Andaman and Nicobar Islands have a tropical rainforest canopy about 86.2% of the total land area. The island is endowed with about one fifth of the country's extensive and diverse mangroves which is accounted to be about 699 sq km as per NCSCM ESA statistics, 2011. The total coastline of the islands is 1962 km which is about 25% of the country's coastline and encompasses 28% of the total Indian Exclusive Economic Zone. India’s only active volcano-the Barren Island is located in the Andaman Islands. The chain of islands was seriously affected by the Indian Ocean Tsunami 2004. Agriculture and fishing are the major economic activity here. A total of 48,675 hectares of land is used for agriculture purposes. Paddy, the main food crop, is mostly cultivated in the Andaman group of islands, whereas coconut and areca nut are the cash crops of Nicobar group of islands. Andaman and Nicobar islands are developing into a major tourism hub with exotic- looking beaches and pristine islands as this scenic nature attracts international as well as domestic tourists. The seas surrounding these islands are absolutely perfect for scuba diving and snorkeling. The Cellular Jail in Andaman and Nicobar Islands is National Memorial as it depicts the agonies of the Indian freedom fighters. Environmental Management Framework for ENCORE Program, 2019. Vol I xlv Figure A:22 Andaman and Nicobar Islands Environmental Management Framework for ENCORE Program, 2019. Vol I xlvi Table A:13 Key Statistics of Andaman and Nicobar Islands ANDAMAN AND NICOBAR ISLANDS Attributes Details Latitude: 6°45’ to 14°41’ N Geographic location Longitude: 92°12’ to 94°57’ E Geographic area 8,250 km2 Forest area 7606 Sq.km Coastline 1962 km Average Annual Rainfall 3000 mm Demographic Indicators Total Population 3.81 Lakhs (as of 2011) Rural Population 2.37 Lakhs Urban Population 1.44 Lakhs Population Density 46 persons/km2 Literacy rate 86.63% (Census 2011) Administrative information No. of districts 3 No. of subdivisions 7 No. of towns 5 No. of Taluks 14 No. of cities 9 Number of villages (including 555 Uninhabited villages) Ports and Harbours Major Ports 1 Minor/ Intermediate Ports 23 Mineral Resources Copper, Chromite National parks 9 Wildlife Sanctuaries 96 Bird Sanctuaries 1 Archaeological sites Nil World Heritage sites 1 (UNESCO) Islands(Inhabited/uninhabited) Tourism No of tourist spots 42 Average annual tourist 4.38 Lakhs ( as of 2016 – 17) No of Beaches 20 Natural Disasters (1975 till date) Environmental Management Framework for ENCORE Program, 2019. Vol I xlvii ANDAMAN AND NICOBAR ISLANDS Attributes Details Cyclones 8 Earthquakes 4 Tsunami 1 Fishery Resources Continental Shelf area 34965 Sq.km Total inland water bodies 552.19 Ha Marine/Inland Fish Landings 39284/220 MT ( as per 2017-2018) Fish Landing centres 25 Coastal area ESA 8961.40 km2 Mangroves 699.26 km2 Corals 493.42 km2 Seagrass 14.60 km2 Salt Marsh 60.24 km2 Turtle Nesting Ground 133.44 km2 Bird Nesting Site 1115.20 km2 Sand Dune Nil Mudflat 123.91 km2 Protected Area 6321.33 km2 Archaeological & Heritage Nil Baseline Scenario of Puducherry Union Territory Puducherry Puducherry is a union territory of India. It has four districts- Puducherry, Mahé, Yanam and Karaikal. Puducherry district is the largest among the four districts of the Union Territory bounded by Bay of Bengal on the east, Cuddalore and Villupuram districts of Tamil Nadu on the other three sides. Puducherry district is an irregular stretch of land spread over 294 sq.km. The district has a semi-arid type of climate, with a mean annual temperature of around 30o C and 70-85 % relative humidity. The region is flat with an average elevation of about 15 m above sea level, intersected by the deltaic channels of River Gingee and Pennaiyar and other streams forming the two main drainage basins. The district bears relics to the rich cultural ancestry and traditional legacy of the bygone French era. Unaltered and unaffected by rapid industrialization, the district of Puducherry has preserved the rich historical past of the glorious period of the French colonies. The economy of people is based on agriculture, animal husbandry and fishing. Blessed with a natural scenic beauty, the district of Puducherry has many interesting places of tourist destination. Some of the notable tourist spots of Puducherry district are Botanical Garden, Puducherry Museum, Auroville and Shri Aurobindo Ashram etc. The area is prone to coastal erosion at certain stretches which are currently under the focus of protection by different engineering soft measures. Environmental Management Framework for ENCORE Program, 2019. Vol I xlviii Figure A:23 Distribution of Union Territory of Puducherry Table A:14 Key Statistics of Union Territory of Puducherry PUDUCHERRY Attributes Details Latitude: 11°55′48″N Geographic location Longitude: 79°49′48″E Geographic area 294 Sq.km Forest area 26.1Sq.km (2017) Coastline 19.78 km Normal Rainfall 1272.7 mm Demographic Indicators Total Population 9.51 Lakhs (as of 2011) Rural Population 6.56 Lakhs Urban Population 2.95 Lakhs Population Density 3232 persons/km2 Literacy rate 85.44% (Census 2011) Administrative information No. of districts 1 No. of subdivisions 0 No. of towns 6 Environmental Management Framework for ENCORE Program, 2019. Vol I xlix PUDUCHERRY Attributes Details No. of Taluks 4 No. of cities 2 No of Gram Panchayats 150 Number of villages (including 81 Uninhabited villages) No of Fishing Villages 17 Ports and Harbours Major Ports 0 Minor/ Intermediate Ports 1 Mineral Resources limestone, clay, lignite, phosphate rocks Wildlife Sanctuaries 1 Bird Sanctuaries 1 Islands(Inhabited/uninhabited) Tourism No of tourist spots 20 Average annual tourist 78000 (as per 2014 ) No of Beaches 2 Types of Coast Sandy 41% Rocky 4% Seawall 55% Natural Disasters (1975 till date) Cyclone 1 Tsunami 1 Fishery Resources Continental Shelf area 1000 Sq.km Total inland water bodies (Ha) 1.35 Ha Marine/Inland Fish Landings 19064 T / 1423 T ( as of 2004-05) Fish Landing centres 16 Coastal area ESA 9.63 km2 Mangroves 4.36 km2 Corals Nil Seagrass Nil Salt Marsh 0.06 km2 Turtle Nesting Ground 0.16 km2 Bird Nesting Site Nil Sand Dune 0.28 km2 Environmental Management Framework for ENCORE Program, 2019. Vol I l PUDUCHERRY Attributes Details Mudflat 4.59 km2 Protected Area Nil Archaeological & Heritage 0.18 km2 Karaikal Karaikal district is one of the four regions of the Union Territory of Puducherry. Karaikal came into existence with effect from June 1, 2005. It is about 130 Km south of Puducherry and enclave within Nagapattinam and Thiruvarur districts of Tamil Nadu. This region is made up of the Municipality of Karaikal, and Communities of Neravy, Tirumalairajanpattinam, Thirunallar, Nedungadu and Kottucherry. Covered completely by a thick mantle of alluvium of variable thickness, the region is flat having gentle slope towards Bay of Bengal in the east. Karaikal is situated in the fag end of Cauvery delta. Cauvery and its tributaries fertilize the lands of Karaikal region. This is the rice bowl of UT of Puducherry. The prominent source of income to the district is from agriculture. Due to scarcity of Cauvery water and poor rainfall the area under cultivation has diminished and the majority in the region could raise only a single crop. In addition to paddy, pulses, groundnut, gingely, banana and vegetables are grown here. The fishing villages of Karaikal are Mandabathur, Kalikuppam, Akkampettai, Kottucherrymedu, Kasakudymedu, in Karaikal municipal area, Kilinjalmedu, Karaikalmedu, in Tirumalairayam Pathinam commune, Karakalchery in Neravy commune, Keezhaiyur Pattincacherry and North vanjore. Karaikal is known for its rich religious heritage, and is a destination for those seeking leisure and serenity. Karaikal Port is a hub for oil exploration activities and multi-cargo handling. Table A:15 Key Statistics of Karaikal in Puducherry KARAIKAL Attributes Details Latitude: 10°49′N to 11°01′N Geographic location Longitude: 79°43′E 79°52′E Geographic area 157Sq.km Forest area 15.1 Sq.km (2017) Coastline 12.04 km Average Annual Rainfall 126 mm Demographic Indicators Total Population 2.00 Lakhs (as of 2011) Rural Population 1.02 Lakhs Urban Population 0.88 Lakhs Population Density 1275 persons/km2 Literacy rate 87.05% (Census 2011) Administrative information No. of districts 0 No. of subdivisions 2 No. of towns 1 No. of Taluks 2 No. of cities 1 Environmental Management Framework for ENCORE Program, 2019. Vol I li KARAIKAL Attributes Details No. of villages (Including 28 inhabited / uninhabited) No of fishing villages 10 Ports and Harbours Major Ports 0 Minor/ Intermediate Ports 1 Mineral Resources Limonite, Garnet sand Islands(Inhabited/uninhabited) Tourism No of tourist spots 12 Average annual tourist 25000 (as of 2014) No of Beaches 2 Types of Coast Sandy Entire Natural Disasters (1975 till date) Cyclone 1 Fishery Resources Marine/Inland Fish Landings 15226.90 T / 2407.84 T ( as of 2004 – 05) Fish Landing centres 9 Mahe Mahe (Mayyazhi) is a land titled as the Eye brow of the Arabian Sea, which is very small and situated on the estuary of the Mayyazhi River and the Arabian Sea. The district satiates an intelligent tourist, Indian, as well as foreign. Mahe is a place with a fantastic blend of Myth and Mystery. Its every nook and corner has its own wonderful stories, which keeps your eyes wild with awe and excitement. Mahe is a tiny point in the Geographical map of Kerala, the million earners for the distant Pondicherry Government, 630 kms away from Puducherry. In this former small French Town which covers an area of 9 Sq. kms, over 36,000 inhabitants live in peace. This petit French Town is situated on the West Coast of the Indian Peninsula between 11 Degrees 42′ and 11 Degrees 43′ Northern Latitude, and between 75 Degrees 31′ and 75 Degrees 33′ Eastern Longitude, just between Badagara and Thalassery, 58 kilometers from Kozhikode, 24 kilometers from Kannur in Kerala State and is a busy trade center. The coast line here lies between the richest fishing belt between Ponnani and Mangalore on the west coast. Mahe is at the center of a prawn group that stretches from Quilon to Mangalore. The major marketing centres in and around Mahe are Mahe, Cannanore or Kannur (24kms), Kozhikode (58 kms) and Tellicherry. Industrial units have concentration only in Pondicherry and Karaikal. The only large scale industry functioning in this district is the Cannanore spinning and weaving mills. Environmental Management Framework for ENCORE Program, 2019. Vol I lii Table A:16 Key Statistics of Mahe in Puducherry MAHE Attributes Details Latitude: 110 42′ To 110 43′ N Geographic location Longitude: 750 31′ To 750 33′ E Geographic area 9 km2 Coastline 7.91 km Average Annual Rainfall 3122.9 mm Demographic Indicators Total Population 41816 (as of 2011) Urban Population 41816 Population Density 4646 persons/km2 Literacy rate 97.87% (Census 2011) Administrative information No. of districts 0 No. of subdivisions 1 Tourism No of tourist spots 4 Average annual tourist 7320 (as of 2011) No of Beaches 1 Types of Coast Sandy Entire Fishery Resources Continental Shelf area 15 sq km Marine/Inland Fish 3170.90 T / 0 ( as of 2004 – 05) Landings Fish Landing centres 1 Yanam Yanam town and eight villages covering 30 sq.km, lies 840 km north-east of Pondicherry, at 16 degrees 42' northern latitude, and between 82 degrees 11' Eastern longitude, within the East Godavari district in Andhra Pradesh. The district lies on the spot where the Coringa River and Godavari River separate. The district lies in the delta of the Godavari River; the town is situated where the river meets its tributary, the Koringa River (Koringa River), nine kilometers from the Bay of Bengal on the Coromandel coast. It is more or less a flat land. The soil is alluvial type suitable for the cultivation of paddy, tobacco, chilly, etc. The crops of this district are coconut, paddy, jowar, ragi, pulses, coriander, fenugreek etc. The main fishing units are Gulrimpeta, Agraharam, Kothapeta, Mettakur, Kanakalapeta, Kursampeta, Padvarevupeta and Sangadirerupeta. The shoe dhony (canoe) is the commonest fishing crafts here. Padona is another kind of boat in use. The catches consist mainly of mullets, hilsa, prawns, cat fish etc. River cruise through the Yanam River is an exhilarating experience for the tourists. Gauthami Godavari River which bounds Yanam on the east and south discharges itself into the Bay of Bengal after flowing almost 14 Kms towards east. Environmental Management Framework for ENCORE Program, 2019. Vol I liii Agriculture and Industries play an important role in strengthening the economy of the district of the Yanam. The district is blessed with numerous important educational institutions of great repute. The agriculturalists of Yanam grow several agricultural products of paddy, coconut, ground nut and pulses in addition to the other miscellaneous crops. The majority of the indigenous populations are engaged in the allied economic activities of fishery and animal husbandry that contributes to building up a strong base for the economic development of the district. Yanam district houses numerous small scale and medium scale cottage industries of coir making and handicraft items that enable the local craftsman of the district to earn handsome revenues. With several important educational institutions, Yanam may truly be said to be the Educational hub of Puducherry UT. Table A:17 Key Statistics of Yanam in Puducherry YANAM Attributes Details Latitude: 16°44′00″N Geographic location Longitude: 82°15′00″E Geographic area 30 sq.km Coastline 5.27 km Average Annual Rainfall 1042.7 mm(2011) Demographic Indicators Total Population 55,626 persons (as of 2011) Urban Population 55,626 persons Population Density 1854 persons/km2 Literacy rate 80% (Census 2011) Administrative information No. of districts 0 No. of subdivisions 1 No. of towns 1 Islands(Inhabited/uninhabited) Tourism No of tourist spots 3 Average annual tourist 15350 (as of 2011) Fishery Resources Marine/Inland Fish Landings 36100 MT / 5850 MT (2011) Fish Landing centres 1 References All references assessed between 8th - 14th May, 2019 1) http://dcmsme.gov.in/dips/state_wise_dips/State%20Industrial%20Profile%20- %20Goa%20(2014-15).pdf 2) https://www.ibef.org/states/goa.aspx 3) https://www.statista.com/statistics/734300/area-of-continental-shelf-by-state-india/ 4) http://districts.nic.in/districts.php?sid=KL 5) https://knowindia.gov.in/states-uts/karnataka.php Environmental Management Framework for ENCORE Program, 2019. Vol I liv 6) http://karenvis.nic.in/Database/FishiersofKarnataka_9760.aspx 7) https://www.karnataka.com/profile/physiography/ 8) http://www.tn.gov.in/tamilnadustate 9) http://tnenvis.nic.in/Database/TN-ENVIS_791.aspx 10) http://agritech.tnau.ac.in/12th_fyp_tn/2.%20Agriculture%20and%20Allied%20Sectors/2_8.pdf 11) https://www.forests.tn.gov.in/pages/view/Introduction-wild 12) http://www.fardodisha.gov.in/sites/default/files/pdfs/Annual%20Activity%20Report%20of%20 Fisheries%20Sector%202017-18.pdf 13) http://natureconservation.in/list-of-national-parks-and-wildlife-sanctuaries-in-odisha-updated/ 14) https://dot.odishatourism.gov.in/sites/default/files/Annual%20Activities%20Report%202017- 18.pdf 15) http://www.osdma.org/ViewDetails.aspx?vchglinkid=GL002&vchplinkid=PL063 16) http://censusgujarat.gov.in/Downloads/PPT/Paper-2/Paper-2%20Volume- 1%20of%202011%20GUJARAT.pdf 17) https://forests.gujarat.gov.in/forest-area.htm 18) http://www.mahaforest.nic.in/internal.php?id=28 19) http://fsi.nic.in/sfr2009/maharastra.pdf 20) http://vlist.in/state/27.html 21) http://fsi.gov.in/LATEST-WB-SITE/pdf_files/statistics/ar2016-17e.pdf 22) http://www.iasri.res.in/agridata/16data/chapter3/db2016tb3_10.pdf 23) http://www.indiaenvironmentportal.org.in/files/file/mtdc-tourism-policy-2016.pdf 24) http://www.forest.kerala.gov.in/index.php/forest/forest-area 25) http://iomenvis.nic.in/index3.aspx?sslid=876&subsublinkid=106&langid=1&mid=1 26) http://dadf.gov.in/sites/default/filess/CMFRI%20Data%20Collection%20System%20for%20Ma rine%20Fish%20Landings_0.pdf 27) http://ibcn.in/wp-content/uploads/2015/05/West-Bengal.pdf 28) https://shodhganga.inflibnet.ac.in/bitstream/10603/152980/12/11%20chapter%203.pdf 29) Collection of tourism statistics for the state of Karnataka” – A report assessed on http://tourism.gov.in/sites/default/files/Other/011%20karnataka.pdf 30) Annual report 2014-2015 Karnataka forest department 31) Fish Landing Centers in Karnataka -http://iomenvis.nic.in 32) http://censuskarnataka.gov.in/Data%20High%20lights-Karnataka-PCA-2011.pdf 33) http://planning.kar.nic.in/docs/Economic%20Survey%20Reports/ES_17- 18/English.pdfhttps://en.wikipedia.org/wiki/Category:Bird_sanctuaries_of_Karnataka 34) https://en.wikipedia.org/wiki/Karnataka 35) https://en.wikipedia.org/wiki/List_of_World_Heritage_Sites_in_India 36) https://en.wikipedia.org/wiki/Wildlife_sanctuaries_of_India 37) https://www.census2011.co.in/census/state/karnataka.html 38) https://www.downtoearth.org.in/news/agriculture/about-100-districts-have-suffered-drought- conditions-for-15-years-50993 39) https://www.indianetzone.com/69/archaeological_sites_karnataka.htm 40) https://www.karnataka.com/profile/forest/ 41) https://www.karnataka.gov.in/dmg/english/Pages/Mineral-resources-of-Karnataka.aspx 42) https://www.karnataka.gov.in/fisheries/english/Pages/Introduction.aspx 43) https://en.wikipedia.org/wiki/List_of_islands_of_India 44) https://www.orissatourism.org/location-of-orissa.html 45) https://www.odisha.gov.in/content/odisha-profile/about-odisha 46) www.walkthroughindia.com/walkthroughs/the-12-major-sea-ports-of-india/ Environmental Management Framework for ENCORE Program, 2019. Vol I lv 47) https://sandrp.in/2017/05/20/odisha-rivers-profile/ 48) http://www.indiaonlinepages.com/population/orissa-population.html 49) https://www.orissatourism.org/ 50) http://www.hltt.in/beaches-backwaters/odisha-beaches.html 51) https://www.orissawildlife.com/wildlife-sanctuary.html 52) A. Balasubramanian (2017),” The Andaman and Nicobar Islands-At a Glance” Researchgate 53) Census of India 2011 report Andaman & Nicobar islands series-36 Part XII-B 54) Department of Fisheries report (marine and inland fish) ,a draft http://www.and.nic.in/pdf/policydocument.pdf 55) Details of Fisheries activities in Andaman & Nicobar Islands http://andssw1.and.nic.in/ecostat/basicstatPDF2011_12/06.%20Fisheries.pdf 56) Directorate of Economics and statistics report- http://andssw1.and.nic.in/ecostat/basicstatPDF2016_17/21.Tourism.pdf 57) http://iomenvis.nic.in/index2.aspx?slid=60&sublinkid=25&langid=1&mid=1 58) http://planningcommission.gov.in/reports/sereport/ser/study_PRIs.pdf 59) http://www.indiaenvironmentportal.org.in/files/file/report-on-andaman-and-nicobar-islands- poaching-issue.pdf 60) http://www.marinebuzz.com/2009/01/26/major-and-minor-ports-in-india/ 61) https://www.britannica.com/place/Andaman-and-Nicobar-Islands 62) https://www.census2011.co.in/census/state/andaman+and+nicobar+islands.html 63) MSME-Development Institute Kolkata, “Brief Industrial Profile of Andaman & Nicobar Islands” 64) District Census Handbook Karaikal Series-35 Part XII-B 65) http://admin.indiaenvironmentportal.org.in/files/pondy_report_web.pdf 66) http://dcmsme.gov.in/dips/IPS%20karaikal%202012_tn.pdf 67) http://fsi.nic.in/isfr2017/puducherry-isfr-2017.pdf 68) https://karaikal.gov.in/general-information/ 69) https://mahe.gov.in/economy/ 70) http://www.india-wris.nrsc.gov.in/wrpinfo/index.php?title=Puducherry – india- WRIS Wiki water resources information system of india 71) https://www.webindia123.com/territories/pondicherry/land/land.htm 72) http://tourism.gov.in/sites/default/files/pondicherry.pdf 73) http://cidcindia.com/coastal-puducherry.pdf 74) http://districts.nic.in/districtsdetails.php?sid=PY&disid=PY003 75) http://fsi.nic.in/isfr2017/puducherry-isfr-2017.pdf 76) https://puducherry-dt.gov.in/about-district/ 77) https://www.py.gov.in/knowpuducherry/districts.html 78) https://www.researchgate.net/figure/2-List-of-marine-Fishing-villages-and-fish-landing-centres- on-the-Puducherry-and_tbl2_320978908 79) Marine fishery census 2010-http://eprints.cmfri.org.in/9003/1/Pon_report_full.pdf 80) Ministry of Tourism (Market Research Division) Government of India “Tourism Survey for Puducherry (Jan- Dec 2014)” Final Report. 81) The Challenged Coast of India, A report 82) https://www.webindia123.com/territories/pondicherry/tourism/Beach.htm#yan 83) https://www.webindia123.com/territories/pondicherry/land/land.htm 84) census of India 2011 Puducherry , districts census hand book, Yanam. 85) https://shodhganga.inflibnet.ac.in/bitstream/10603/903/11/11_chapter%204.pdf 86) https://www.censusindia2011.com/puducherry/yanam-population.html Environmental Management Framework for ENCORE Program, 2019. Vol I lvi 87) https://www.studyandscore.com/studymaterial-detail/coastal-states-of-india-coastal-length-of- indian-states 88) http://eprints.cmfri.org.in/9009/ 89) https://www.insightsonindia.com/wp-content/uploads/2018/03/INDIA-STATE-OF-FOREST- REPORT-2017-Highlights.pdf 90) http://fsi.nic.in/isfr2017/isfr-forest-cover-2017.pdf 91) http://eprints.cmfri.org.in/5529/1/9_Pondicherry_Marine_Census_2005.pdf 92) https://www.census2011.co.in/census/state/daman+and+diu.html 93) http://eprints.cmfri.org.in/8998/1/India_report_full.pdf 94) https://lakshadweep.gov.in/departments/fisheries/ 95) https://www.gktoday.in/gk/major-ports-of-india/ 96) https://lakshadweep.gov.in/ 97) http://www.citypopulation.de/India-Lakshadweep.html 98) https://whc.unesco.org/en/list/798 99) http://www.and.nic.in/pdf/policydocument.pdf 100) http://www.osdma.org/ViewDetails.aspx?vchglinkid=GL001&vchplinkid=PL003 101) https://www.censusindia2011.com/lakshadweep/lakshadweep-population.html 102) http://iomenvis.nic.in/index2.aspx?slid=758&sublinkid=119&langid=1&mid=1 103) http://cidcindia.com/coastal-puducherry.pdf Environmental Management Framework for ENCORE Program, 2019. Vol I lvii Annexure II: Baseline Environmental Scenario of Indian Subcontinent Climate and Meteorology This section discusses the aspects of rainfall and temperature across the country. The climate of India is divided into five (5) zones as per SP-7: 200588 on the basis of the following criteria: Figure A:24 Climatic Zones of India 88 Ministry of Non-renewable Energy Environmental Management Framework for ENCORE Program, 2019. Vol I lviii Table A.18 Attributes of Various Climatic Zones Sl. Climatic Maximum Ambient Humidity Annual Remarks No Zone Temperature Range (0C) (%) Precipitation Summer Winter (mm) 1 Hot and Day: 40-45 Day: 5 -25 25-40 < 500 Covers Western and Dry Night: 20-30 Night: 0 -10 Central Part of India 2 Warm Day: 30-35 Day: 25-30 70-90 1200 Covers coastal parts of and Night: 25-30 Night: 20-25 the country Humid 3 Moderate Day: 30-34 Day: 27-33 Winter >1000 Covers hilly or high- /Tempera Night: 17-24 Night: 16-18 and plateau regions with te Summer: fairly abundant 20—55 vegetation Monsoon : 55-90 4 Composit Day : 32-43 Day : 10-25 Dry period 500-1300 Covers Central Part of e Night : 27-32 Night : 4-10 : 20-25 India Wet periods : 55-95 5 Cold and Day :20-30 Winter : 4-8 70-80 1000 Northern part of India Cloudy Night : 17-27 Night : -3 to experiences this type of 4 climate. Most cold and cloudy regions are situated at high altitudes 6 Cold and Day : 17-24 Day : -7 to 8 10-50 200 Leh (Ladakh) Sunny Night : 4-11 Night : -14 to 0 Ecology and Biodiversity The ecology and biodiversity aspects encompass the hotspots of various eco-sensitive zones notified by MoEFCC. India has 881 sensitive locations which include National Parks, Wildlife Sanctuaries, Core Biosphere Reserves, Ramsar sites pertaining to Wetlands, major estuaries in the coastal areas, Marine protected areas, potential important bird areas and tiger reserves, notified elephant reserves and critically polluted areas. The inventory of the aforesaid eco- sensitive zones in each state in given in Annexure I89. Andaman Nicobar, Maharashtra, Gujarat, Tamil Nadu, Madhya Pradesh, Rajasthan, Himachal Pradesh, Uttar Pradesh, Karnataka, Kerala, Andhra Pradesh, Assam, Odisha are states with more than 30 sensitive zones as per the list given in Annexure I. The entire costal belt of India, up to 500 m from High Tide Line, and all locations where mangroves are present are also environmentally sensitive locations. Land Use The land is used for agriculture, for growing forests, for grazing animals, for mining, for installing industries and for construction of houses, roads, railways, etc. For sustainable 89 Lists as compiled in Nov 2017. Environmental Management Framework for ENCORE Program, 2019. Vol I lix development and prosperity of any country, the proper and wise use of the land is required. The land use depends on the kind of land, its depth, fertility, water retention capacity, available mineral contents, and means of transportation, etc. The use of land for agriculture depends on soil type, irrigation facilities, and climate. In India, about 51.09% of the land is under cultivation, 21.81% under forest and 3.92% under pasture. Built up areas and uncultivated land occupies about 12.34% (Kundra, 1999). About 5.17% of the total land is uncultivated waste, which can be converted into agricultural land. The other types of land comprises up to 4.67%. Demographic profile of India The demographic profile of India is presented in Table A:19 below. Table A:19 Demographic Profile of India90 Sl. No Demographic Attribute Total Males Female (Percentage) (Percentage) 1 Population 1210854977 623270258 (51.5) 587584719 (48.5) 2 Literates (7+ years) 763638812 434763622 (36) 328875190 (27) (63) 3 Population Density (per 382 sq.km) 4 Population size (0-6) 164515253 85752254 (7) 78762999 (6.5) years (13.5) 5 Sex Ratio 943 6 Sex Ratio (0-6) years 918 The demographic profile of India as per the Census of India 2011 reflects that India has a population of 1,210,854,977 about out of which 51.5% are males while 48.5% are females. The Literate population (7+ years) is about 763,638,812 no’s which is about 63% as compared to the total population of India in which 36% are males and the rest i.e., 27% are females. The population density is 382 per sq.km. The population size within the age bracket of 0-6 years is 164,515,253 no’s which is about 13.5% out of which 7% are males while 6.5% are females as compared to the total population of India. The sex ratio is 943 while the sex ratio in the age bracket of 0-6 years is 918. Cultural Heritage India is rich in its history and culture. It has many listed/notified and unlisted archaeological properties along its length and breadth. India has more than 3400 Archaeological properties identified by the Archaeological Survey of India. It reflects that the maximum number of archaeological monuments are in the State of Karnataka (506) followed by State (413), Uttar Pradesh (376), Maharashtra (285) and Delhi (174). Apart from these, there are many properties and occasions which are considered as Heritage by local administration and communities. 90 http://www.dataforall.org/dashboard/censusinfoindia_pca/ Environmental Management Framework for ENCORE Program, 2019. Vol I lx Several national level pilgrimages/ mass gatherings (for example Ajmer Sharif, Bodhgaya, Puri, Rameshwaram, Belur Math, Guruvayoor Temple, Somnath Temple, Rajgir, Shirdi, Vaishno Devi etc. and many others) and various local pilgrim destinations and circuits are also considered as part of local culture by various communities. The sensitivities regarding cultural heritage in the form of the number of notified archaeological monuments as per the Archaeological Survey of India were collated and are presented in Table A:20 below. Table A:20 List of Archaeological Monuments State Archaeological State Archaeological monuments monuments Andhra Pradesh 8 Madhya Pradesh 292 Arunachal Pradesh 5 Maharashtra 217 Assam 55 Manipur 1 Bihar 70 Meghalaya 8 Chhattisgarh 47 Mizoram 1 Dadar and Nagar 0 Nagaland 4 Haveli Daman and Diu 12 Odisha 78 Delhi 174 Pondicherry 7 Goa 21 Punjab 33 Gujarat 202 Rajasthan 163 Haryana 91 Sikkim 3 Himachal Pradesh 40 State 413 Jammu and Kashmir 69 Tripura 8 Jharkhand 12 Uttar Pradesh 742 Karnataka 506 Uttarakhand 44 Kerala 26 West Bengal 134 Natural Disasters The data collected from National Disaster Management Authority website reveals that the states of Sikkim, Maharashtra and Gujarat are prone to Earthquakes, while the states of Odisha, Andhra Pradesh and State are vulnerable to the cyclonic events, while Jammu and Kashmir are prone to cloudburst and floods also. The State of Uttarakhand is susceptible to floods and Bihar is susceptible to flood events. The data of the notable natural disasters are presented in Table A:21 below. Environmental Management Framework for ENCORE Program, 2019. Vol I lxi Table A:21 Major Natural Disasters which occurred in India 91 Sl. No. Name of Event Year State & Area Fatalities 1 Cyclone Fani 2019 Odisha 2 Floods and heavy 2018 Kerala rains 3 Flood and Heavy July -15 Rajasthan 38 people died Rains 4 Flood and heavy June ,July - Gujarat 71 people died in July rains 15 80 people died in June 5 Lightning Oct -15 Maharashtra 32 people died 6 Flood and Heavy Nov15 to State 350 people died Rains Dec-15 7 Flood and Heavy June-15 to Sikkim 41 people died Rains July -15 8 Thunderstorm April -15 Bihar 65 people died Earthquake 50 people died 9 Flood and heavy Aug -15 to Assam 41 people died rains Sept -15 10 Flood and heavy July-15 to West Bengal 70 people died rains Aug-15 11 Lightning Apr-15 to Odisha 240 people died Aug-15 36 people died May-15 Heat Wave 12 Heat Wave May-15 to Telangana 580 people died June -15 13 Heat Wave May-15 to Andhra Pradesh 1400 people died June-15 50 people died Nov -15 to Flood and Heavy Dec-15 Rains 14 Floods Oct-14 Jammu & Kashmir 15 Cyclone Hud Sep-14 Andhra Pradesh & Odisha 16 Odisha Floods Oct-13 Odisha 21 17 Andhra Floods Oct-13 Andhra Pradesh 53 18 Cyclone Phailin Oct-13 Odisha and Andhra 23 Pradesh 17 Floods/Landslides Jun-13 Uttarakhand and 4,094 Himachal Pradesh 91 http://www.ndma.gov.in/en/disaster-data-statistics.html and http://www.imdpune.gov.in/Links/annual%20summary%202015.pdf Environmental Management Framework for ENCORE Program, 2019. Vol I lxii Sl. No. Name of Event Year State & Area Fatalities 18 Cyclone Mahasen May-13 State 8 Cyclone Nilam Oct-12 State 65 19 Uttarakhand Floods Aug – Sep Uttarkashi, 52 2012 Rudraprayag and Bageshwar 20 Assam Floods July – Aug Assam --- 2012 21 Cyclone Thane Dec-11 State, Puducherry 47 22 Sikkim Earthquake Sep-11 Sikkim, West 60 Bengal, Bihar 23 Odisha Floods Sep-11 19 Districts of 45 Odisha 24 Sikkim Earthquake 2011 North Eastern India 97 people died (75 in with epicentre near Sikkim) Nepal Border and Sikkim 25 Cloudburst 2010 Leh, Ladakh in 257 people died J&K 26 Drought 2009 252 Districts in 10 ----- States 27 Krishna floods 2009 Andhra Pradesh, 300 people died Karnataka 28 Kosi Floods 2008 North Bihar 527 deaths, 19,323 livestock perished, 2,23,000 houses damaged, 3.3 million persons affected 29 Cyclone Nisha 2008 State 204 deaths 30 Maharashtra Floods Jul-05 Maharashtra State 1094 deaths 167 injured 54 missing 31 Kashmir 2005 Mostly Pakistan, 1400 deaths in Kashmir Partially Kashmir (86,000 deaths in total) 32 Tsunami 2004 Coastline of State, 10,749 deaths Kerala, Andhra 5,640 persons missing Pradesh, Pondicherry and 2.79 million people Andaman and affected Nicobar Islands of India 11,827 hectares of crops damaged 300,000 fisher folk lost their livelihood Gujarat Earthquake 2001 Rapar, Bhuj, 13,805 deaths 33 Bhachau, Anjar, Environmental Management Framework for ENCORE Program, 2019. Vol I lxiii Sl. No. Name of Event Year State & Area Fatalities Ahmedabad and 6.3 million people Surat in Gujarat affected State 34 Orissa Super 1999 Orissa Over 10,000 deaths Cyclone 35 Cyclone 1996 Andhra Pradesh 1,000 people died, 5,80,000 housed destroyed, Rs. 20.26 billion estimated damage 36 Latur Earthquake 1993 Latur, Marathwada 7,928 people died 37 region of Maharashtra 30,000 injured 38 Cyclone 1990 Andhra Pradesh 967 people died, 435,000 acres of land affected 39 Drought 1987 15 States 300 million people affected 40 Cyclone 1977 Andhra Pradesh 10,000 deaths hundreds of thousands homeless 40,000 cattle deaths 41 Drought 1972 Large part of the 200 million people country affected Environmental Management Framework for ENCORE Program, 2019. Vol I lxiv Annexure III: Details of Applicable Regulations Table A:22 Key Regulations Applicable to ENCORE Sector Acts Purpose Describe applicability to Project Components Coastal Coastal Regulation This notification under the Environment Care to be taken while selecting the project interventions according to the norms of Regulation Zone (CRZ) (Protection) Act, 1986 supplements the law on CRZ. Many of sub-projects are situated in CRZ areas and will require obtaining Zone Notification, 2019 site clearance by declaring certain zones as CRZ permission before start of construction. Some of the typical projects are but not and regulates activities in these zones. The CRZ limited to solid waste management, components of livelihood development, STP, Notification, 2011 clearly lists out the areas that faecal sludge management, hatchery and interpretation centers, conservation fall within the categories of I, II, III and IV of activities etc. CRZ and the permissible and non-permissible The purpose of CRZ–2011 is to ensure the livelihood of fisher communities and other activities in each zone. The main objectives of communities living in the coastal areas and conservation and protection of coastal the Coastal Regulation Zone Notification, 2016 stretches and its unique environment and marine environment. are to ensure livelihood security to the fishing communities and other local communities living Development activities or projects, regulated or permissible, falling in CRZ-I and in the coastal areas; to conserve and protect CRZ-IV areas need clearance from the MoEFCC for clearance based on the coastal stretches and; to promote development in recommendations form the concerned CZMZ. a sustainable manner based on scientific principles, taking into account the dangers of All the activities falling in CRZ-II and CRZ-III will seek clearance from the CZMA natural hazards in the coastal areas and sea level and however for the projects traversing through CRZ-I and CRZ-IV areas or both rise due to global warming. need clearance from the MoEFCC. Projects attracting this notification shall obtain CRZ clearance for implementation from the Project or activities which require ESIA clearance along with CRZ clearance will be authority as required. dealt with as a composite environmental and CRZ clearance under ESIA notification, 2006. Environmental Management Framework for ENCORE Program, 2019. Vol I lxv Sector Acts Purpose Describe applicability to Project Components Water No.36 of 1977, To provide for the prevention and control of All construction activities involved to attain the project objective may create Pollution [7/12/1977] - The water pollution, and for the maintaining or localized deterioration in water quality if executed without proper diligence. Water (Prevention restoring of wholesomeness of water in the and Control of country. The Act was amended in 1988. The This Act prohibits the discharge of pollutants into water bodies beyond a given Pollution) Cess Act, Water (Prevention and Control of Pollution) Cess standard and lays down penalties for noncompliance. 1977, amended 1992 Act was enacted in 1977, to provide for the levy Water act includes the maintenance or restoring the wholesomeness of the water and collection of a cess on water consumed by No. 19 of 2003, persons operating and carrying on certain types Consent to Establish and Consent to Operate are required to be taken for such projects [17/3/2003] - The of industrial activities. Water (Prevention and Control of Under this law, it is mandatory to obtain consent Pollution) Cess for discharge of effluents and pay consent fees to (Amendment) Act, State Pollution Control Boards for any municipal 2003 projects causing water pollution. No.6 of 1974, [23/3/1974] - The Water (Prevention and Control of Pollution) Act, 1974, amended 1988 Air Pollution No.14 of 1981, To provide for the prevention, control, and Air act restricts the operation of any industrial plant in an air pollution control area [29/3/1981] - The abatement of air pollution in India. without a valid consent. The Air Act is applicable to all civil works activities, Air (Prevention and activities that involves the use of DG Sets and other machines contributing to Control of Pollution) These laws address the prevention and control of air pollutions. Act 1981, amended air pollution. Under section 21 of this Act, it is 1987 and rules mandatory to obtain consent from the Pollution The construction activities involved to attain the project objective may create thereof Control Board to establish or operate any localised deterioration in air and water quality if executed without proper diligence. industrial operation. Activities involving emission of pollutants like establishing batch All construction contractors need to obtain consent-to-establish and consent- mixing plants require consent from Pollution to-operate for plants i.e. concrete batching, stone crushing and other plants that Control Boards. they may be required for the purpose of construction. The NOC certificates need to be obtained from the nearest regional offices of the SPCB. Whe rein the existing plants are used, the contractor shall ensure that all applicable consents are obtained for operating the plant. Environmental Management Framework for ENCORE Program, 2019. Vol I lxvi Sector Acts Purpose Describe applicability to Project Components Ambient air quality standards should be followed as per the National Ambient Air Quality Standards, Central Pollution Control Board Notification – November 18, 2009. Environmental No.29 of 1986, To provide for the protection and improvement Some of the typical projects are but not limited to construction activities, sewage and Protection [23/5/1986] - The of the environment. It empowers the Central trade effluents, solid waste management, effluent treatment plant and livelihood Environment Government to establish authorities [under projects etc. (Protection) Act, section 3(3)] charged with the mandate of 1986, amended 1991 preventing environmental pollution in all its The proposed project intervention involves construction activities that will have and rules forms and to tackle specific environmental indirect or direct impact on the overall quality of the environment. problems that are peculiar to different parts of the country, and improve the quality of the Empowered by the EP Act, the Ministry of Environment, Forests and Climate environment by setting standards for emissions Change (MoEFCC) Government of India has issued various notifications such as and discharges; regulating the location of Hazardous Wastes (Management & Handling) Rules, 1989; Manufacture, Storage industries; management of hazardous wastes, and and Import of Hazardous Chemicals Rules, 1989; Noise Pollution (Regulation and protection of public health and welfare. This Control) Rules, 2000; Environmental Impact Assessment Notification, 2006 etc. encompasses all legislations providing for the protection of the environment in the country. It includes the power to direct the closure, prohibition or regulation of any industry, operation or process by the government. The Act was last amended in 1991. Popularly known as EP Act, it is an umbrella legislation that supplements existing environmental regulations. This law essentially links pollution and natural resource issues. Salient features of the Act are the following: Section 6 empowers the Government of India to make rules to regulate environmental pollution by stipulating standards and maximum allowable limits to prevent air, water, noise, soil, and other environmental pollutants Section 7 prohibits operations that emit pollutants in excess of standards Environmental Management Framework for ENCORE Program, 2019. Vol I lxvii Sector Acts Purpose Describe applicability to Project Components Section 9 regulates handling of hazardous substances and identifies persons responsible for discharges and pollution prevention Environmental ESIA Notification, The notification specifies that prior Prior permission for typical projects but no limited to Common hazardous waste Impact dt 2006 environmental clearance is required for the treatment, storage and disposal facilities (TSDFs), Common Municipal Solid Waste Assessment (S.O.1533(E), projects listed in the schedule of the notification Management Facility (CMSWMF) dt.14/09/2006) before any construction work, or preparation of land by the project management except for Environment (Protection) Rules, 1986 imposes restrictions and prohibitions on new securing the land, is started on the project or projects or activities, or on the expansion or modernization of existing projects or activity. The Schedule of the notification lists activities based on their potential environmental impacts as indicated in the Schedule eight broad categories of projects that require to the notification prior environmental clearance. These projects are categorized in to Category ‘A’ and category ‘B’ This project incorporates sub-projects in States and UTs which will require based on the magnitude and environmental environmental clearance. Such projects which will need environmental clearance will impacts of the project. Clearance is to be fall under Category A or Category B depending on the nature and location of the obtained from the Ministry of Environment, project. Forests and Climate Change for Category ‘A’ Projects with activities related to 7(h) Common Effluent Treatment Plants (CETPs), projects, and from the State Environment Impact 7(i) Common Municipal Solid Waste Management Facility (CMSWMF) and 8(a) Assessment Authority (SESIAA) for Category Construction projects will be considered applicable for Environmental clearance ‘B’ projects. Category ‘B’ projects will be further category B. classified in to category ‘B1’ and category ‘B2’ For Category B the State or Union territory Level Environment Impact Assessment based on their magnitude and environmental Authority (SESIAA), to be constituted by the Central Government in consultation impacts. Category ‘B2’ projects do not require an with the State Government or the Union territory Administration concerned under ESIA study. The scope and ToR of the ESIA sub-section (3) of section 3 of the Environment (Protection) Act, 1986. study for category ‘A’ and category ‘B’ projects However, as per the ESIA notification 2006, any project or activity specified in will be decided by the MoEFCC and the Category ‘B’ will be treated as Category A, if located in whole or in part within 10 SESIAA respectively. km from the boundary of: (i) Protected Areas notified under the Wild Life ICZMP projects falling under any of these (Protection) Act, 1972, (ii) Critically Polluted areas as notified by the Central categories will have to obtain environmental Pollution Control Board from time to time, (iii) Notified Eco-sensitive areas, (iv) clearance from the authority as applicable. inter-State boundaries and international boundaries. Public No.6 of 1991, To provide for damages to victims of an accident All projects involving storage or handling of chemicals, including sewage treatment Liability [22/1/1991] - The that occurs due to the handling of any hazardous plants, research institutions. Insurance Public Liability substance. The Act applies to all owners Insurance Act, 1991, associated with the production or handling of any According to this notification, all the Major Accident Hazard (MAH) units handling amended 1992 hazardous chemicals. chemicals in excess of the threshold quantities referred to in the Manufacture, Storage and Import of Hazardous Chemical Rules, 1989, are mandated to take an insurance Environmental Management Framework for ENCORE Program, 2019. Vol I lxviii Sector Acts Purpose Describe applicability to Project Components policy and deposit an equal amount in the Environment Relief Fund (ERF) to ensure immediate payment to the chemical accident victims. Forest Forest The Forest Conservation Act 1980 was enacted To be ascertained for each sub-project during the screening/ preparation process. By Conservation (Conservation) Act, to help conserve the country's forests. It strictly and large project interventions will not be located in notified or protected forest area/s 1980, amended restricts and regulates the de-reservation of and therefore will not require diversion of forest land. Such areas will be avoided as 1988. forests or the use of forest land for non-forest far as possible during the selection of sites and through screening exercise. The Indian Forest purposes without the prior approval of the Act, 1927 Central Government. To this end, the Act lays This Act restricts the powers of the state in respect of de-reservation of forests and State/Union down the pre-requisites for the diversion of forest the use of forestland for non-forest purposes. Territory Minor land for non-forest purposes. Forest Produce The Indian Forest Act, 1927 consolidates the law All diversions of forestlands to any non- forest purpose, even if the area is privately (Ownership of relating to forests, the transit of forest-produce owned, require approval of the central government Forest Dependent and the duty leviable on timber and other forest- Leases of forest land to any organization or individual require approval of the central Community) Act, produce. government. Proposals for diversion of forest land for construction of dwelling 2005 - Draft houses are not to be entertained Forest (Conservation) Act, 1980 was enacted to halt rapid deforestation and governments cannot de-reserve forest land or direct that it be used for non-forest purposes. Projects with activities falling in reserved forest areas need a clearance from MoEFCC. Biological No. 18 of 2003, To realize the objectives enshrined in the United To be ascertained for each sub-project during the screening/ preparation process. Diversity [5/2/2003] - The Nations Convention on Biological Diversity Some sites/activities may be located close to ecologically sensitive areas that are Biological Diversity (CBD) 1992 which recognizes the sovereign beyond the protected domain. Act, 2002 and rights of states to use their own Biological related Resources. The Act aims at the conservation of The Biological Diversity Act, which came into force in February 2003, aims to biological resources and associated knowledge as promote conservation, sustainable use and equitable sharing of benefits of India’s well as facilitating access to them in a sustainable biodiversity resources. manner and through a just process for purposes of implementing the objects of the Act it It provides for establishment of a National Biodiversity Authority at national level, establishes the National Biodiversity Authority State Biodiversity Boards at state level and Biodiversity Management Committees at in Chennai. the level of Panchayats and Municipalities Wetland Wetland Protection and management of wetlands. The typical project activities related to this are; mangrove restoration, marine and Protection (Conservation and The rules list of wetlands that needs to be coastal fauna such as marine turtle conservation and rejuvenation o(de-siltation) of Management) Rules protected like those covered under Ramsar creeks and others. The rules will be applicable to the project activities located in: 2010 Convention, those in UNESCO heritage site, Environmental Management Framework for ENCORE Program, 2019. Vol I lxix Sector Acts Purpose Describe applicability to Project Components those which are ecologically sensitive etc., and (i)any of the wetlands with international importance identified as Ramsar site under prohibits the following activities within such Ramsar Convention on Wetlands (3.1) wetlands: (ii)wetlands notified by the concerned State Governments which are located in their Reclamation of wetlands jurisdiction (3.2) Setting up of new industries and expansion of (iii)wetlands notified by the Central Government based on recommendation of the existing industries Union territory Administrations for wetlands located in their jurisdiction (3.3) Manufacture, storage, handling or disposal of hazardous substances Projects in the wetlands in coastal areas shall be regulated as per the provisions of Solid waste dumping the Coastal Regulation Zone Notification, 2011 (2019) and the respective Discharge of untreated effluents management plans. Any permanent construction except boat jetties Any other activity affecting the ecosystem of the These projects shall comply with the (i) the principle of ‘wise use’ for maintaining wetland the ecological integrity, (ii) and as per the comprehensive list of activities developed by the Wetland Authority of a State/Union Territory and the integrated management plan prepared for each of the notified wetlands. (4. h & i). Heritage Ancient Monuments Excavation of and protection of ancient While project activities are not envisaged in such areas, considering the possibility Preservation and Archaeological monuments. Permit for activity near of a chance finding of objects of historical importance (given the state’s and project Sites and Remains ancient/protected monuments, chance findings area's cultural setting) during implementation of sub-projects, this is being triggered. Act 1958 updated as per Ancient The Ancient Monuments and Archaeological sites should be protected from any Monuments and developmental activity. Archaeological Sites and Remains The area within the radius of 100 m and 300m from the Protected Property is (Amendments and designated as Protected area and Controlled Area respectively. Validation) Act, No development activity (including building, mining, excavating, blasting etc.,) is 2010 permitted in the Protected Area and developmental activities likely to damage the protected property is not permitted in the Controlled Area without prior permission of the Archaeological Survey of India. Relevant. Activities in the protected area shall not be undertaken. If activities are to be done in the controlled area of protected properties, then the implementing agency/line department needs to take the necessary clearance from ASI. Disaster Disaster Codes for construction under in disaster prone Some of the typical activities concerning disaster management acts are soft measures Related Management Act, areas taken up for coastal protection, mangrove restoration, bio-shield plantation, and 2005 Disaster prone areas codes of construction, multi-purpose cyclone shelter. disaster relief codes, relief and rehabilitation Environmental Management Framework for ENCORE Program, 2019. Vol I lxx Sector Acts Purpose Describe applicability to Project Components Measures that must be taken for the prevention of disasters, or the mitigation of their effects Depending on the nature and location, it is required that project activities will comply with the National/State or departmental disaster management plan92. Particularly, the State authority can review any standard laid for construction and take up necessary actions if it is considered to be inadequate. Wildlife The Wildlife With the objective of effectively protecting the Project interventions will not be located in designated or notified protected areas, Protection (Protection) Act, wild life of this country and to control poaching, such as Wildlife Sanctuaries and National Parks. 1972, as amended in smuggling and illegal trade in wildlife and its Such areas shall be avoided during the selection of sites and through screening 1993. derivatives. This Act seeks to protect wildlife, by exercise. The Wild Life creating protected areas and controlling trade in (Protection) wildlife products. The Act was amended in This Act provides for protection to listed species of Flora and Fauna in the declared Amendment Act, January 2003 and punishment and network of ecologically important protected areas such as wild life sanctuaries and 2006 (No. 39 of penalty for offences under the Act have been national parks. The wildlife protection act has allowed the government to establish a 2006) made more stringent. The Ministry has proposed number of national Parks and Sanctuaries, over the past 25 years, to protect and The Wild Life further amendments in the law by introducing conserve the flora and fauna of the state (Protection) more rigid measures to strengthen the Act. The Amendment Act, objective is to provide protection to the listed Utmost care has been taken while selecting the project location that none of the 2002 (No. 16 of endangered flora and fauna and ecologically projects is located in the Wildlife protected area or National Parks. 2003, [17/01/2003]) important protected areas. Project activities that cross over into protected area regimes then requisite permission must be obtained. Green Tribunal National Green For effective and expeditious disposal of cases This Act applies to all the project activities which may have a substantial question Tribunal Act, 2010 relating to environmental protection and related to the environment. (No. 19 of 2010) conservation of forests and other natural resources Effective and expeditious disposal of cases relating to environmental protection and conservation of forests and other natural resources. This act provides for the establishment of National Green Tribunal for effective and This Act applies to all the project activities which may have a substantial question expeditious disposal of cases relating to related to the environment. According to this Act, applications can be made by: 92 Karnataka: http://www.dm.karnataka.gov.in/page.php?id=148 Kerala: http://sdma.kerala.gov.in/wp-content/uploads/2018/11/Kerala%20State%20Disaster%20Management%20Plan%202016.pdf Tamil Nadu: https://tnsdma.tn.gov.in/app/webroot/img/document/tnsdma-2016.pdf Environmental Management Framework for ENCORE Program, 2019. Vol I lxxi Sector Acts Purpose Describe applicability to Project Components environmental protection and conservation of i. the person who has sustained injury forests and other natural resources including ii. the owner or the property to which the damage has been caused enforcement of any legal right to environment iii. where death has resulted from the environmental damage by all or any of the legal and giving relief and compensation for damages representatives of the deceased. to persons and property and for matters iv. any agency duly authorized by such person or owner of such property or all or connected therewith or incidental. The National any of the legal representatives Green Tribunal established under this act is a v. any person aggrieved, including any presentative body or organization specialized body equipped with the necessary vi. the Central or State Government or a Union Territory Administration or the expertise to handle environmental disputes Central Pollution control Board or a State Pollution Control Board or Committee or involving multi-disciplinary issues. The Tribunal a local authority, or any environmental authority constituted or established under the shall not be bound by the procedure laid down Environment Protection Act 1986 or any other law. (18.2) under the Code of Civil Procedure, 1908, but shall be guided by principles of natural justice. The Tribunal, by an order, will provide: i. relief and compensation to the victims of pollution and other environmental damage (15.a) ii. for restitution of property damage (15.b) iii. for restitution of environment for such areas The relief and compensation shall be in addition to the relief paid under the Public Liability Insurance Act 1991(15.c) Heads under which compensation or damage can be claimed are: Death Permanent, temporary, total or partial disability or other injury or sickness Loss of wages due to total or partial disability or permanent or temporary disability Medical expenses incurred for treatment of injuries or sickness Damages to private properties Expenses incurred by the Government or any local authority in providing relief, aid and rehabilitation to the affected persons Expenses incurred by the Government for any administrative or legal action or to cope with any harm or damage including compensation for environmental degradation and restoration of the quality of environment Loss to the Government or local authority arising out of, or connected with, the activity causing any damage Claims on account of any harm, degradation or destruction to fauna including milch and draught animals and aquatic fauna Claims on account of any harm, degradation or destruction to flora including aquatic flora, crops, vegetables, trees, and orchards Environmental Management Framework for ENCORE Program, 2019. Vol I lxxii Sector Acts Purpose Describe applicability to Project Components Claims including cost of restoration on account of any harm or damage to the environment including pollution of soil, air, water, land, and eco-systems Loss and destruction of any property other than private property; Loss of business or employment or both Any other claim arising out of, or connected with, any activity of handling of hazardous substances. (Schedule II) The Tribunal can distribute the compensation under separate heads as specified so as to compensate the claimant and restitute the damaged property or environment. Noise The Noise Pollution To regulate and control of noise producing and The typical project activities where the Noise Pollution Rules may have implications Pollution (Regulation and generating sources (industrial activity, are mainly sources such as construction activities, generator set, vehicular horn and Control) Rules, 2000 construction activity, generator sets, loud other mechanical devices related to physical infrastructure (STP, SWM or soft speakers and Public-address system, horns, engineering intervention for coastal protection and other) or development of mechanical devices) with the objective of infrastructure for social/livelihood activities (construction of work shelters, fish maintaining ambient air quality standards in auction halls and others). respect of noise. All construction projects, events, and associated activities which will generate high Noise pollution has effects on human health and noise levels. The use of generator sets, vibrating equipment, activities like drilling, the psychological wellbeing of the people; it is etc will generate high noise levels. considered necessary to regulate and control Project contractors shall adopt appropriate noise muffling devices, Personnel noise producing and venerating sources with the Protection equipment for workers working under high noise levels, create buffers objective of maintaining the ambient air quality with hard materials. standards in respect of noise. Some projects create noise pollution during the operation stage as well. Green belts and buffers shall be planned. Activities shall be phased out to exclude high noise The ambient air quality standards in respect of generating activities during night time. noise for different areas/zones namely industrial, commercial, residential or silence areas/zones are All development authorities, local bodies and other concerned authorities, while specified in the Schedule of these rules. An area planning a developmental activity, or carrying out functions relating to town and comprising not less than 100 metres around country planning; will take into consideration the aspects of noise pollution. (3.4) hospitals, educational institutions and courts may be declared as silence area/zone as per these While selecting project locations, it may be taken into consideration that an area rules. The noise levels in any area/zone shall not comprising not less than 100 meters around hospitals, educational institutions and exceed the ambient air quality standards in courts may be declared as silence area/zone. respect of noise as specified in the Schedule. The ambient air quality standards with respect to noise will be as per the category of areas/zone which will be categorized by the State Government. Environmental Management Framework for ENCORE Program, 2019. Vol I lxxiii Sector Acts Purpose Describe applicability to Project Components Area Category of area/zone Limit in dB(A) Code Day time Night time A Industrial area 75 70 B Commercial area 65 55 C Residential Area 55 45 D Silence Zone 50 40 * Silent zone is an area comprising not less than 100 mts around educational institutions, courts, religious places or any other area which is declared by the competent authority All construction projects, events and associated activities which will generate high noise levels. The use of generator sets, vibrating equipment, activities like drilling, etc will generate high noise levels. Project contractors shall adopt appropriate noise muffling devices, Personnel Protection equipment for workers working under high noise levels, create buffers with hard materials. Some projects create noise pollution during the operation stage as well. Green belts and buffers shall be planned. Activities shall be phased out to exclude high noise generating activities during night time. Siting The Environment Detailed provisions relating to areas to be This may be applicable in case of any subproject wherein an industry is proposed to Industries (Siting for Industrial avoided for siting of industries, precautionary be established; as in the case of a Solid Waste Management Facility, Construction Projects) Rules, measures to and Demolition Waste Facility or a Plastic Waste Management Facility 1999 be taken for site selecting as also the aspects of environmental protection which should have been incorporated during the implementation of the industrial development projects Handling of The Batteries Shall apply to every manufacturer, importer, re- These rules apply to every project involved in the manufacture, import, re-condition, Batteries (Management & conditioner, assembler, dealer, auctioneer, assemble, dealing, recycling auction, consumer and bulk consumer involved in Handling) Rules, consumer, and bulk consumer involved in the manufacture, processing, sale, purchase, and use of batteries or components. 2001 manufacture, processing, sale, purchase, and use of batteries or components so as to regulate and There are a large number of illegal units run in deplorable conditions and creating a ensure the environmentally safe disposal of used threat to public health and the environment. batteries. Dealer in collaboration with the local authority should ensure the mechanism for collection and transportation of used batteries Environmental Management Framework for ENCORE Program, 2019. Vol I lxxiv Sector Acts Purpose Describe applicability to Project Components Any dealer needs to obtain registration from Ministry of Environment and Forests to legally reprocess batteries CPCB will review the compliance of the rules periodically to improve the collection and recycling of used Lead batteries Local authority or Project Executing Agency is responsible to regulate and ensure the safe disposal of used batteries and the implementation of other provisions of the Rules and take necessary clearance. Hazardous Hazardous and Other To control the generation, collection, treatment, Typical project activities related to any projects dealing with hazardous materials Wastes Wastes import, storage, and handling of hazardous (chemical, biological, reactive, toxic, flammable, explosive or corrosive specified in (Management and waste. The Rules distinguish between hazardous Schedules), import and export of hazardous waste. Transboundary and other wastes. The import of solid plastic Movement) Rules, waste, including PET bottles, is banned along These rules may be applicable to any intervention dealing with hazardous materials 2016 with waste electrical and electronic assemblies having characteristics such as physical, chemical, biological, reactive, toxic, scrap, and other chemical wastes, especially flammable, explosive or corrosive, causes danger or is likely to cause danger to health those in solvent form. or environment. This law addresses the handling of hazardous substances that fall under specified schedules and • Management of hazardous and other wastes involves prevention, minimization, necessitates authorization for such facilities from reuse, recycling, recovery and its utilization including co-processing and safe the State Pollution Control Board. Projects disposal. attracting this rule will have to follow the • waste generated should be sent or sold to an authorized user for disposal guidelines for handling and disposal of hazardous • Transportation to an authorized disposal facility in accordance with these rules wastes. • Steps to contain contaminants and prevent accidents and safety gears to all handling waste • For import and export of waste prescribed in Schedule III (Part A and Part B) need prior permission from the MoEFCC. Manufacture, These rules aim at providing control for the Typical project interventions related to any projects / industrial activity dealing with Storage and Import generation, storage and Import of hazardous hazardous chemical materials as mentioned in the rules, its isolated storage, of Hazardous chemicals. According to these rules, the user of upgradation of industrial unit, site or in the pipeline, import and export of hazardous Chemicals Rules, hazardous chemicals has to follow procedures as chemicals. 1989 stipulated in the rules to prevent and control (MSIHC Rules, hazards from such chemicals and to ensure safety These rules may be applicable to all activities dealing with hazardous chemical 1989) and permission has to be obtained from the materials or prevent such major accidents and to limit their consequences by creating authority concerned for such activity. Environmental Management Framework for ENCORE Program, 2019. Vol I lxxv Sector Acts Purpose Describe applicability to Project Components The list of chemicals and threshold limits of awareness with information technology and equipment’s including antidotes to handling falling under the purview of these rules persons and the environment. is provided in the schedule to the rules. Chlorine used for disinfection of water is categorised as a) Notification of major accidents within 48 hr and steps taken to avoid any such hazardous chemical as according to these rules occurrences in the future. and usage of these chemicals above 10 tons per b) Increase or decrease in the maximum threshold quantity of a hazardous chemical year attracts the provisions of these rules. is liable for upgradation at the site or in the pipeline c) Both new and existing industrial activities shall prepare a safety report and carryout independent safety audit of respective industrial activities d) Prepare and keep up-to-date on-site emergency plan and off-site emergency plan e) Every container of hazardous chemical is clearly marked and labelled f) Hazardous chemical is imported by providing all the necessary information prescribed in Schedule V Solid Wastes Solid Waste Apply to every local body/ authority responsible Typical project activities related to waste generated in 3 categories bio-degradable, Management Rules, for the collection, segregation, storage, non-biodegradable and domestic hazardous waste, composting, waste to energy, 2016 transportation, processing, and disposal of waste to wealth, sanitary landfill or reclamation of dumping ground. municipal solid wastes. These rules lay emphasis on source segregation and the use of 4R’s to Solid waste generation is increasing day by day and in the absence of a proper minimize waste going to the landfill sites. It lays mechanism of disposal it is being dumped everywhere causing nuisance and threat stress on composting of the organic, bio- to health and environment degradable waste. Further, these rules lay guidelines to be followed by the urban local Waste Generators shall segregate waste & store separately and hand over to bodies/gram panchayat or the operator for the authorized waste collector disposal of residual waste in a scientific manner. Local Authority/Panchayats/PEA shall prepare the SWM plan with timeline & its These rules authorize urban local bodies/gram implementation, segregate, adopt 4-Rs, material recovery, processing/ disposal of panchayat to levy user charges to the waste waste, levy user fee & spot fine. generators. It also authorizes to levy Spot fine for District Collector/Magistrate shall facilitate identification and allocation of landfill littering and non-segregation of the waste. site, quarterly review the performance of local bodies Plastic Waste Plastic Waste Regulatory frame work for management of These rules are applicable to every plastic waste generator or unit or industry Management Rules plastic waste generated in the country; and to involved in the manufacture, import and production of plastic and these rules are 2016 implement these rules more effectively and to exempted for the export-oriented units or units in special economic zones notified by give thrust on plastic waste minimization, source the Central Government. segregation, recycling, involving waste pickers, recyclers and waste processors in collection of plastic waste fraction either from households or Environmental Management Framework for ENCORE Program, 2019. Vol I lxxvi Sector Acts Purpose Describe applicability to Project Components any other source of its generation or intermediate Most of the plastic is recyclable, the recycling sector is largely unorganised and material recovery facility and adopt polluter’s incapable of handling the volume. Toxic chemicals leach out of plastic and seep into pay principle for the sustainability of the waste ground water, lakes and rivers without proper management. management system These rules provide guidelines for manufacturers All the producers, retailers, recyclers and manufacturers shall obtain registration of plastic bags with respect to thickness from the State Pollution Control Board (40microns), labelling of plastic bags and prohibits availability to consumers free of cost. Local authority / Gram Panchayats either on its own or by engaging an agency shall Further, these rules lay the responsibility of set up, operationalize and co-ordinate for waste management for ensuring disposal of these wastes in a scientific manner segregation, collection, storage, transportation of plastic waste and channelization of with the municipalities/ urban local body. recyclable plastic waste to recyclers having valid registration form SPCB. E-Waste E-waste The rules prescribe procedures for manufacture, Any activity involved in production, manufacture, sale, and purchase of electrical (Management) collection, dismantling, recycling, disposal of equipment as listed in Schedule I of Rules and in the process of collection, storage Rules, 2016 electronic wastes and requires authorisation of dismantling and recycling and disposal of e-waste. the State Pollution Control Board for the same. Shall apply to every manufacturer producer, In the process of breakdown of hazardous material of e-waste by the informal sector consumer, bulk consumer, collection centers, their working condition and risk to health and environment polluting ground water dealers, e-retailer, refurbisher, dismantler and and soil. recycler involved in manufacture, sale, transfer, purchase, collection, storage and processing of e- SPCB will provide authorization to the manufacturer for the collection, recycling and waste or electrical and electronic equipment disposal. Dismantler should obtain authorization from the concerned SPCB for listed in Schedule I, including their components, dismantling of e-waste (segregation and recovery) and non-recyclable or non- consumables, parts and spares which make the recoverable components will be sent to authorized treatment storage and disposal product operational but shall not apply to - facilities (a) used lead acid batteries as covered under the Batteries (Management and Handling) Rules, These rules are applicable to every manufacturer, 2001 made under the Act; (b) micro enterprises producer, consumer, bulk consumer, collection centers, dealers, e-retailer, dismantler as defined in the Micro, Small and Medium and recycler involved in manufacture, sale, transfer, purchase, collection, storage and Enterprises Development Act, 2006 (27 of 2006); processing of e-waste or electrical and electronic equipment. And may store the e- and (c) radio-active wastes as covered under the waste for a period of 6months and shall maintain a record of collection, sale, transfer provisions of the Atomic Energy Act, 1962 (33 and storage of wastes. The processes involved shall not have any adverse effect on of 1962) and rules made there under. health and environment Environmental Management Framework for ENCORE Program, 2019. Vol I lxxvii Sector Acts Purpose Describe applicability to Project Components Construction Construction and Emphasizes the roles and accountability of waste These rules are applicable in all the project interventions where there is a need for and Demolition Waste generators and various stakeholders, gives thrust the construction, demolition or remodelling of the building structure. However, some Demolition Management Rules, to segregation (four categories– concrete, soil, of the typical projects where these rules need to consider are various kinds of STP, waste 2016 steel and wood, plastics, bricks and mortar), faecal sludge management, components of solid waste management, marine recovery, reuse, recycle at source, address in aquarium cum interpretation centre, riverbank protection, some projects under detail the management of construction and livelihood where construction is required etc. demolition waste. This will ensure that the waste generated during the process will be segregated, recycled and reused and the remaining waste is disposed of scientifically. And these rules encourage to recycle and reuse of the material in new construction activities. Waste generators are responsible for the storage and transportation and disposal of C&D waste to the authorized processing facilities and payment of relevant charges notified by concerned authority. Large generators have to prepare an environmental management plans and waste management plans and get approved from the local authorities before initiating any project. State Government land concerned department will provide suitable sites for setting up of the storage, processing and recycling facilities and Town and Country planning Department will incorporate the site in the approved land use Plan for sustainable development of processing facility and Procurement of materials made from C&D waste to be made mandatory to a certain percentage in municipal and Government contracts subject to strict quality control Thermoset Guidelines for Applies to disposal of thermoset plastics as in It is applicable to industrial development of automobiles, electronic and electrical, Plastic waste Disposal of Electrical & electronics: housing, fuses, mass transport, power utilities, domestic and sanitary appliances. As this project Thermoset Plastic switchgear, etc. and Power utilities like MCB doesn’t have any such development but will be applicable to waste generated from Waste including boxes. Thermoset plastic can’t be remoulded or these activities at household or community level along with components of solid Sheet moulding recycled due to its composite chemical structure. waste management like reclamation of dumping ground etc. compound Further, these rules provide guidelines for the (SMC)/Fibre disposal of SMC/FRP in the cement kilns Thermoset plastic can’t be remoulded or recycled due to its composite chemical Reinforced Plastic through proper monitoring of the air quality. structure and discarded waste gets accumulated and landfilled. (FRP) Local authority / Gram Panchayat / PEA will set up, operationalize the waste management system. Major producers of thermoset plastic like automotive industry, electricity authority, etc devise a mechanism for the collection and transportation of waste to cement kilns Environmental Management Framework for ENCORE Program, 2019. Vol I lxxviii Sector Acts Purpose Describe applicability to Project Components as alternate fuel. They should also develop regular air quality monitoring of these kilns. Electric Safety Central Electricity Safety requirements for Operations, Construction Central electricity authority (technical standards for construction of electrical plants Authority (Technical and maintenance of electric plants and electricity and electrical lines) is applicable to all the thermal generating stations and electrical Standards for lines lines for transmission. Construction of Electrical Plants and Project interventions will not be planned in the proximity of the thermal generating Electric Lines) stations and electrical lines. Such areas shall be avoided during the selection of sites Amendment and through screening exercise. Regulations,2016 Compliance with all applicable environmental quality standards (air quality, gaseous emissions, liquid effluent discharge, solid waste disposal etc.) as per the CPCB / SPCB Not applicable as such project’s interventions are not planned for thermal stations and electrical transmission lines or in the vicinity of the same. Electric Safety Electricity Act 2003, Para 67 & 68 give provision for granting license This act has provision for an authorized licensee to shift public utilities such as relevant para- to the licensee to break-up any utility area like railway lines, sewage lines, drains etc. after obtaining written approval for laying electricity Laws, roads, railway line, sewage lines, drain or tunnel transmission lines section 67, 68 & 69. to lay the transmission lines in his area of supply. This is required to install poles and lattice Applicable if electric lines are to be laid for any project such as energy generation structures and the laying of transmission lines. and supply (alternate energy), laying of lines is necessary for supply to a subproject The Act says that ‘…the consent in writing of the facility appropriate government, local authority, owner or occupier as the case shall be required for The licensee shall obtain written consent required to carry out work. The appropriate carrying out the work.’ This applies to government / PEA may specify nature and period of notice given by licensee to carry agricultural land as well. out work; procedure for consideration of suggestion and objections received; payment of compensation to the affected; right of owner/occupier to carry out certain works; procedure for alteration of position of pipelines, electric lines etc.; avoidance of public nuisance, environmental damage and unnecessary damage to the public and private property by such works and manner of restoration and maintenance thereof; procedure for deposition of compensation payable etc. Environmental Management Framework for ENCORE Program, 2019. Vol I lxxix Sector Acts Purpose Describe applicability to Project Components Worker Health Building and Other All the establishments involved in the It applies to an authority, contractor or the employer employing more than ten and Safety at Construction construction activities involving 10 or more workers at a time undertaking building or other construction work – construction, work place Workers Act workers on any day of the preceding twelve alteration, repair, streets, roads, flood protection work. months. This act lays the basis for the welfare of the construction worker on the site with basic This Act ensures workers' welfare for safety and other basic provisions such as fixed provision like fixed working hours, availability working hours and a rest day, temporary habitable accommodation, creche, first aid, of potable drinking water, latrine, creche etc. as latrines and drinking water provisions in any establishment. State Welfare Board will well as by providing temporary habitable ensure pension and immediate assistance in case of an accident. accommodation Every establishment has to register within 60days from the commencement of work to the registration office. Every building worker registered (worker completed eighteen years of age, but has not completed sixty years of age, and is engaged in any building or other construction work for not less than ninety days during the preceding twelve months ) as a beneficiary under this Act is entitled to the benefits provided by the Board from its Fund under this Act. The contractor will notify the authority of the accident (death, body injury preventing from work) within forty-eight hours. Registered building workers will contribute to the fund at rates specified by the state government until he attains the age of sixty years. Contractor will make provision at convenient location for safe drinking water; latrine and urinals; free of charge temporary habitable accommodation with lavatory facilities, habitable room for children below the age of six where more than fifty female workers are employed; first aid facilities; canteen where more than two hundred and fifty workers are employed. Safety Committee will be an establishment where more than five hundred workers are employed. February 2009, the Declared by the Ministry of Labor and This Policy is applicable to every employer or employee in any establishments National Policy on Employment, Government of India in February engaged in any industry including construction to regulate all economic activities for Safety, Health and 2009 after consultations with partners. The management of safety and health risks at workplaces Environment at Action Program to implement the Policy is part Work Place of the document. Sets out a set of goals with the This Policy will ensure the welfare and to provide measures so as to ensure safe and view to building and maintaining a national healthy working conditions for every working man and woman by reducing preventative safety and health culture and incidences of injuries, fatalities and diseases improving the safety, health and environment at Environmental Management Framework for ENCORE Program, 2019. Vol I lxxx Sector Acts Purpose Describe applicability to Project Components workplace. The Policy also expresses a set of Government will provide statutory framework on Occupational Safety and Health to national objectives. employer for designing suitable control system for compliance, enforcement and incentives for better compliance Building Fly Ash This notification necessitates the use of flyash for This Notification is applicable to the fly ash producing thermal power plants. Materials Notification, 1999 various construction activities like brick However, the projects don’t have proposed any activities involved in the generation manufacturing, road projects, etc within a 100km of fly ash. But it is applicable to the construction activities such as bricks, paver radius of thermal power stations. blocks road construction etc. within 100km radius of thermal power plant. Fly ash is used for paving roads, in embankment and mine fills, making fly ash bricks etc. It can also be used as a replacement material of cement and fine aggregate in green paver blocks and tiles as a means of sustainable construction. Local authorities need to specify in their tender documents, building byelaws and regulations for the use of fly-ash and fly-ash based products. Central Electricity Authority and other approving agencies will provide land for fly ash storage up to 50 hectares for 500 MW unit (based on 45% ash content) Thermal power plants (lignite and coal) is free to sell fly-ash to users/agencies i) pond ash should be available free of charge to fly-ash product manufacturing units, farmers, Public works department, road construction agencies etc. ii) at least 20% of dry ESP fly-ash shall be made available free of charge to fly-ash brick, block tiles manufacturers. Construction agencies engaged in construction within100 km radius of thermal power plant will fly ash based products for construction and for reclamation of low lying soil borrow areas only fly ash will be used for compaction. Manual Prohibition of This act prohibits the construction of insanitary Care to be taken to ensure that no individual will be employed for manual scavenging Scavengers Employment as latrines and employment or engaging of manual activities. Manual Scavengers scavenger for the purpose of manual scavenging. ‘and their No person, local authority or any agency shall, Prevention of manual scavenger working in inhumane and hazardous conditions Rehabilitation Bill from such date as notified by the State without personal protective equipment. It also has the provision for every individual 2012 Government (which shall not be later than one involved in manual scavenging for rehabilitation and providing an alternate sources year from the date of commencement of this of livelihood to sustainable and healthy living. Act), engage or employ, either directly or indirectly, any person for hazardous cleaning of Local authority shall carry out a survey of insanitary latrines and give notice to the a sewer or a septic tank. occupier for upgradation into sanitary latrine. If occupier fails to demolish or convert Environmental Management Framework for ENCORE Program, 2019. Vol I lxxxi Sector Acts Purpose Describe applicability to Project Components into sanitary latrine local authority shall convert or demolish such latrines and recover the cost incurred form the occupier. District magistrate of the concerned district shall be responsible for the rehabilitation of each manual scavenger Any person in the final list of survey shall be rehabilitated by providing photo identity card, one time cash assistance; scholarship for the children; residential plot and financial assistance for construction or ready built house; livelihood skill training depending on eligibility and willingness with stipend for the training period; or subsidy or concessional loan for taking alternative livelihood on sustainable basis to at least one adult. Any contract or agreement for engaging or employing a person for the purpose of manual scavenging should be terminated and compensation will be payable. Any person engaged as a full-time basis as manual scavenger shall be retained subject to his willingness shall be assigned work other than manual scavenging. Local authority, railway authority and cantonment board shall be responsible for the construction and maintenance of sanitary community latrines. Climate National Action Plan India is faced with the challenge of sustaining its The National Action Plan on Climate Change is organized through intersectoral Change on Climate Change rapid economic growth while dealing with the groups including various related ministries, Planning Commission, experts from global threat of climate change. India, in 2008, industry, academia and civil society to overcome, adapt and mitigate the effects of has set up a National Action plan on climate climate change for sustainable development. The typical interventions where it is change (NAPCC) which outlined policies aimed applicable are indicative but not limited to solar lighting, agriculture, rainwater at sustainable growth and dealing with climate harvesting, restoration of bio shields and mangroves, disaster preparedness etc. change concerns effectively. NAPCC outlines eight national missions to address various The plan document elaborates on an approach to reduce the stress of climate change adaptation and mitigation measures pertaining to and uses the poverty-growth linkage. Emphasizing the overriding priority of Solar Energy, Enhanced Energy Efficiency, maintaining high economic growth rates to raise living standards, the plan identifies Sustainable Habitat, Water, Sustaining measures that promote development objectives while also yielding co-benefits for Himalayan Ecosystem, Green India, Sustaining addressing climate change effectively. Agriculture, Strategic Knowledge on Climate Change. The Prime Minister’s Council on Climate Change is in charge of the overall implementation of the plan. Inclusive and sustainable development strategy to protect the poor Environmental Management Framework for ENCORE Program, 2019. Vol I lxxxii Sector Acts Purpose Describe applicability to Project Components Qualitative change in the method through which the national growth objectives will be achieved i.e. by enhancing ecological sustainability leading to further mitigation Cost effective strategies for end use demand side management Deployment of appropriate technologies for extensive and accelerated adaptation, and mitigation of greenhouse gases Innovative market, regulatory and voluntary mechanisms to promote Sustainable Development Implementation through linkages with civil society, local governments and public- private partnerships International cooperation, transfer of technology and funding Energy Energy Aims to reduce specific energy consumption in This Act is applicable to energy consumption in various sectors to minimize energy conservation Conservation Act, different sectors and sets up a specialized Bureau consumption and increase energy efficiency through the design and utilization of 2001 of Energy Efficiency to institutionalize energy applicable / energy efficient appliances. efficiency measures, monitoring, and Provide a policy framework and direction to provide for efficient use of energy and measurement at plant and macro-levels. its conservation Central Government may specify the norms for processes and energy consumption standards for any equipment, appliances; prohibit manufacture or sale or purchase or import of equipment or appliance; direct any designated consumer to furnish information of energy consumed and actions taken to the recommendations of accredited energy auditor to the designated agency. Bureau will implement pilot projects and demonstration projects for promotion, promote innovative financing and provide financial assistance to the institutions for promoting efficient use of energy and its conservation. State government may amend the energy conservation building codes to suit the regional and local climate and notify the energy conservation building code; direct every owner or occupier of a building or building complex to comply with the energy conservation codes; designated agency shall appoint inspecting officers to ensure compliance with energy consumption after the expiry of five years from the date of commencement of this Act. Environmental Management Framework for ENCORE Program, 2019. Vol I lxxxiii Sector Acts Purpose Describe applicability to Project Components Energy The Energy Conservation Act 2001 that was The Code is applicable to buildings or building complexes that have a connected load Conservation passed by the Indian Parliament, empowered the of more than 100 kW or contract demand of 120 kVA or greater and are used for Building Code Central Government to prescribe an Energy commercial purposes. Not applicable to buildings under the private residential (ECBC) Conservation Building Code (ECBC). ECBC purpose. was launched in 2007 on a voluntary basis by the Bureau of Energy Efficiency (BEE). ECBC sets The purpose of the Energy Conservation Building Code (Code) is to provide minimum energy efficiency standards for design minimum requirements for the energy-efficient design and construction of buildings. and construction encouraging energy efficient The Code also provides two additional sets of incremental requirements for buildings design or retrofit of buildings without to achieve enhanced levels of energy efficiency. constraining the building function, comfort, health, or the productivity of the occupants and To comply with the Code, buildings shall demonstrate compliance with ECBC appropriate regard for economic considerations. requirements Mandatory Scope Covers commercial buildings (a) have an Energy Performance Index Ratio (EPI Ratio) less than or equal to 1, with a connected Load in excess of 500kW or (b) meet all mandatory requirements for (i) Building envelope, (ii) Thermal comfort when Contract Demand in excess of 600 kVA. systems and controls, including heating, ventilating, and air conditioning, service hot ECBC is recommended for all buildings with water heating, (iii) Lighting systems and controls, and (iv) Electrical systems, (v) conditioned area >1000m2 and applies to new renewable energy systems as specified in the ECBC Code. constructions. Social Policies Land The Right to Fair The Right to Fair Compensation and i) Projects for which this rule is applicable Acquisition Compensation and Transparency in Land Acquisition, Resettlement Though it has been especially taken care of at the preliminary design stage that no (rehabilitation Transparency in and Rehabilitation (RFCTLAR&R) Act, 2013, private land will be acquired, there may be some project activities where a minimum and Land Acquisition, enacted by the Government of India is the latest amount of private land might be required. For infrastructure projects; resettlement) Rehabilitation and legislation. The act specifies that the process of 1. All activities or items listed in the notification of the Government of India in the Resettlement Act, obtaining the consent shall be carried out along Department of Economic Affairs (Infrastructure Section) number 13/6/2009-INF, 2013 with the Social Impact Assessment (SIA) study. dated the 27th March 2012 The act also has the provision that no land shall 2. Projects involving supply of inputs to agriculture, warehousing, cold storage be transferred by way of acquisition, in the facilities, marketing infrastructure for agriculture and allied activities such as Scheduled Areas in contravention of any law dairy, set up or owned by the appropriate Government (including any order or judgment of a court 3. Project for water harvesting and water conservation structures, sanitation which has become final) relating to land 4. Project for tourism transfer, prevailing in Scheduled Areas. ii) reasons for applicability In the case of private land acquisition for construction or any other project activity. The act defines (1) "affected area" as such area In this regard, obtaining consent during SIA is compulsory for compensation, as may be notified by the Government for the rehabilitation and resettlement. Environmental Management Framework for ENCORE Program, 2019. Vol I lxxxiv Sector Acts Purpose Describe applicability to Project Components purposes of land acquisition; (2) “affected family" includes a family whose land or other immovable property has been acquired; a family which does not own any land but a member or members of such family may be agricultural labourers, tenants including any form of tenancy or holding of usufruct right, share-croppers or artisans or who may be working in the affected area for three years prior to the acquisition of the land, whose primary source of livelihood stand affected by the acquisition of land; (3) the Scheduled Tribes and other traditional forest dwellers who have lost any of their forest rights recognized under the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006 due to acquisition of land (4) family whose primary source of livelihood for three years prior to the acquisition of the land is dependent on forests or water bodies and includes gatherers of forest produce, hunters, fisher folk and boatmen and such livelihood is affected due to acquisition of land. S. No. Application Definition of Entitlement Details Entitled Unit A. Loss of Private Agricultural, Home-Stead & Commercial Land 1 Land for the Titleholder family. Compensation at Market a) Land for land, if available. Or, Cash compensation for the land at replacement value, which will Project and families with value, Resettlement and be determined as provided under section 26 of the RFCTLARR Act 2013. traditional land Right Rehabilitation b) The land if allotted will be in the name of both husband and wife. c) If post-acquisition, residual land is economically unviable, the land owner will have the choice of either retaining or sell off the rest of the land. d) Refund of stamp duty and registration charges incurred for replacement land to be paid by the project; replacement land must be bought within a year from the date of payment of compensation to project affected persons. e) Subsistence allowance of Rs. 36000 as one-time grant f) One-time grant of Rs. 500,000 or annuity g) Compensation at market value for loss of crops if any Environmental Management Framework for ENCORE Program, 2019. Vol I lxxxv Sector Acts Purpose Describe applicability to Project Components Residual land Titleholder 11.8.1.1.1.1 family Compensation In case residual land is found to be economically unviable, PAPs have the choice of: and c) selling off the residual land at the market value to the project at replacement value, d) take 25% of the compensation value and retain the land parcel. families with Resettlement and traditional land Right Rehabilitation B. Loss of Private Structures (Residential/Commercial) 2 Loss of Title Holder/ Owner Compensation at Market a) Cash compensation for the structure at the Market value which would be determined as per as per Structure value, Resettlement & section 29 of the RFCTLARR Act 2013. House under Indira AwasYojana in rural area or Rs Rehabilitation 50000 in lieu off and house under RAY in urban area or Rs 100,000 in lieu off. The house if Assistance allotted will be in the name of both husband and wife. b) Right to salvage material from the demolished structures. c) Three months' notice to vacate structures. d) Refund of stamp duty and registration charges for purchase of new alternative houses/shops at prevailing rates on the market value as determined in (a) above. Alternative houses/shops must be bought within a year from the date of payment of compensation. e) In the case of partially affected structures and the remaining structure remains viable, an additional10% to restore the structure. In case of partially affected structures and the remaining structure becomes unviable additional 25% of compensation amount as severance allowance. f) Subsistence allowance equivalent to Rs. 36000 as one-time grant. g) Each affected family getting displaced shall get a one-time financial assistance of Rs 50,000 as shifting allowance. h) Each affected family that is displaced and has cattle, shall get financial assistance of Rs 25,000/- for construction of cattle shed. i) One-time grant of Rs. 50,000 as resettlement assistance j) Each affected person who is a rural artisan, small trader or self-employed person and who has been displaced (in this project owner of any residential-cum commercial structure) shall get a one- time financial assistance of Rs 25,000/-for construction of working shed or shop. k) One-time grant of Rs. 500,000 3 Structure Tenants/ Lease Resettlement & a) Registered lessees will be entitled to an apportionment of the compensation payable to structure Holders Rehabilitation owner in case the lessee has erected any art of1 the structure as per applicable local laws. Assistance b) In case of tenants, three months written notice will be provided along with Rs 50,000 towards shifting allowance. C. Loss of Trees and Crops 4 Standing Trees, Owners and Compensation at market a) Three months advance notice to project affected persons to harvest fruits, standing crops and Crops beneficiaries value removal of trees. Environmental Management Framework for ENCORE Program, 2019. Vol I lxxxvi Sector Acts Purpose Describe applicability to Project Components (Registered/ Un- b) Compensation to be paid at the rate estimated by: registered tenants, i) The Forest Department for timber trees contract cultivators, ii) The State Agriculture Extension Department for crops leaseholders & iii) The Horticulture Department for fruit/flower bearing trees. sharecroppers c) Registered tenants, contract cultivators & leaseholders & sharecroppers will be eligible for compensation for trees and crops as per the agreement document between the owner and the beneficiaries. d) Un-registered tenants, contract cultivators, leaseholders & sharecroppers will be eligible for compensation for trees and crops as per mutual understanding between the owner and the beneficiaries. D. Loss of Residential/ Commercial Structures to Non-Titled Holders 5 Structures on Owners of Structures Resettlement & a) Non-vulnerable encroachers shall be given three months' notice to vacate occupied land Government or Occupants of Rehabilitation b) Vulnerable encroachers will be provided cash assistance at replacement cost for loss of structures land structures identified Assistance as described in section 29 of the RFCTLARR Act 2013. as per Project Census c) Any encroacher identified as non-vulnerable but losing more than 25% of the structure used will Survey be paid cash assistance at replacement cost for loss of structures. The amount will be determined as per section 29 of the RFCTLARR Act 2013. d) All squatters to be paid cash assistance for their structures at replacement costs which will be determined as mentioned in section 29 of the RFCTLARR Act 2013. e) All squatters (other than kiosks) will be eligible for a one-time grant of Rs 36000 as a subsistence allowance. f) All squatters other than Kiosks will be given a shifting allowance of Rs 50,000 per family as a one-time grant for a permanent structure and Rs. 30,000 for a semi-permanent structure and Rs. 10,000 for a temporary structure. g) Each affected person who is a rural artisan, small trader or self-employed person assistance' of Rs 25,000/- for construction of working shed or shop. h) In the case of Kiosks, only Rs. 5000 will be paid as a one-time grant. E. Loss of Livelihood 6 Families living Title Holders/ Resettlement & a) Subsistence allowance of Rs. 36,000 as a one-time grant. (PAPs covered under 1(f), 2 (f) and within the Non-Title holders/ Rehabilitation 5 (e) above would not be eligible for this assistance). project area sharecroppers, Assistance b) Training Assistance of Rs 10,000/- for income generation per family. agricultural c) Temporary employment in the project construction work to project affected persons with labourers and particular attention to vulnerable groups by the project contractor during construction, to the employees extent possible and preference in the employment of semi-skilled and unskilled jobs in the project with adequate training for the job. Environmental Management Framework for ENCORE Program, 2019. Vol I lxxxvii Sector Acts Purpose Describe applicability to Project Components F. Additional Support to Vulnerable Families 7 Families within As per the definition Resettlement & One-time additional financial assistance of Rs. 50,000. the project area of vulnerable Rehabilitation Squatters and encroachers already covered under clause 5 are not eligible for this assistance. Assistance G. Loss of Community Infrastructure/Common Property Resources 8 Structures & Affected Reconstruction of Reconstruction of community structure and Common property resources in consultation with the other resources communities and community structure and community. (e.g. land, water, groups common property access to resources structures etc.) within the project area H. Temporary Impact During Construction 9 Land & assets Owners of land & Compensation for Compensation to be paid by the contractor for loss of assets, crops and any other damage as per prior temporarily Assets temporary impact during agreement between the ‘Contractor’ and the ‘Affected Party’. impacted construction e.g. damage during to the adjacent parcel of construction land / assets due to movement of vehicles for transportation of equipment’s, machinery and construction activities for infrastructure development. I. Resettlement Site 10 Loss of Displaced Provision of resettlement Resettlement sites will be developed as part of the project, if a minimum of 25 project displaced residential titleholders and non- site/ vendor market families opt for assisted resettlement. Vulnerable PAPs will be given preference in allotment of structures titleholders plots/flats at the resettlement site. Plot size will be equivalent to size lost subject to a maximum of provision given in RFCTLARR Act 2013. Basic facilities shall be provided by the project at resettlement site as per the provisions given in the Third Schedule of RFCTLARR Act 2013. Similarly, if at least 25 displaced commercial establishments (small business enterprises) opt for shopping units, the Project Authority will develop the vendor market at suitable location in the nearby area in consultation with displaced persons. Basic facilities such as approach road, electricity connection, water and sanitation facility, will be provided in the vendor market by the project. Environmental Management Framework for ENCORE Program, 2019. Vol I lxxxviii Sector Acts Purpose Describe applicability to Project Components Vulnerable PAPs will be given preference in allotment, of shops in vendor market. One displaced family will be eligible for only one land plot at resettlement site or shop in the vendor market. J. Land on lease 11 Titleholders Land Owners/ Annual Lease rental for a) Annual Lease Rent as per pre-agreed rate with the land owners giving consent for sparing their Titleholders use of land land for the project b) Provisions regarding the increase in lease rent on predetermined rates and timeframe c) Provisions related to loss of structure/ trees/ crops as per the provisions of Clause 2 and 4 respectively 12 Agricultural Non-Title holders/ As per Clause 6 above Labor sharecroppers, agricultural labourers and employees Community 73rd constitutional The act strengthens the decentralized i) Projects for which this rule is applicable participation amendment act, governance system and promotes bottom-up This act is applicable to interventions that are located in rural areas. The following and local 1992 planning. As per the act, there will the three-tier are the related areas under the jurisdiction of Panchayats. Under this Act, the Gram governance system of panchayats (at the village, district and Panchayat takes care of the functions such as agriculture including agricultural state level). the Gram Panchayat level plans are expansion, land improvement, implementation of land reforms, land consolidation to be prepared in Gram Sabha which is having and soil conservation, Industry, minor irrigation, water management and watershed an important bearing on the planning process of development, non-conventional sources of energy among others. the proposed project. The act is having both ii) reasons for applicability mandatory and discretionary provisions and of The Gram Sabha and Gram Panchayat will be extensively involved in consultation the mandatory provisions of the Panchayati Raj with the community as well as be the immediate nodal agency for information Act, the most critical are those that strengthen related to the project, or to direct the community to the right authority in case of the structure of representative democracy and grievance. political representation at the local level. iii) procedures to be followed Consultations in different phases of the project will be done in cooperation with the Gram Sabha and Gram Panchayat. Provisions of the Panchayats (Extension to the Scheduled Areas) Act, 1996 (PESA) applicable to Andhra Pradesh The salient feature of the Panchayats (Extension to the Scheduled Areas) Act, 1996 (PESA) and the modalities worked out to grant rights to tribals in the country are: 1. Legislation on Panchayats shall be in conformity with the customary law, social and religious practices and traditional management practices of community resources; Environmental Management Framework for ENCORE Program, 2019. Vol I lxxxix Sector Acts Purpose Describe applicability to Project Components 2. Habitation or a group of habitations or a hamlet or a group of hamlets comprising a community and managing its affairs in accordance with traditions and customs; and shall have a separate Gram Sabha. 3. Every Gram Sabha to safeguard and preserve the traditions and customs of people, their cultural identity, community resources and the customary mode of dispute resolution. 4. The Gram Sabhas have roles and responsibilities in approving all development works in the village, identify beneficiaries, issue certificates of utilization of funds; powers to control institutions and functionaries in all social sectors and local plans. 5. Gram Sabhas or Panchayats at appropriate level shall also have powers to manage minor water bodies; power of mandatory consultation in matters of land acquisition; resettlement and rehabilitation and prospecting licenses/mining leases for minor minerals; power to prevent alienation of land and restore alienated land; regulate and restrict sale/consumption of liquor; manage village markets, control money lending to STs; and ownership of minor forest produce. 74th constitutional This Act empowers the urban local bodies by i) Projects for which this rule is applicable amendment act, giving them constitutional status. Article 243Q Apart from the administrative functions, after the introduction of 12th Schedule 1992 provides for the establishment of 3 kinds of functions such as urban planning and regulation of land-use and construction of Municipalities such as Nagar Panchayat, buildings, urban forestry, protection of the environment and promotion of Municipal council and Municipal Corporation. ecological aspects, provision of urban amenities and facilities such as parks, gardens, playgrounds and others have been added. ii) reasons for applicability The Nagar Panchayat, Municipal council and Municipal Corporation will be extensively involved in consultation with the community as well as be the immediate nodal agency for information related to the project, or to direct the community to the right authority in case of grievance. iii) procedures to be followed Consultations at different phases of the project will be done in cooperation with the Nagar Panchayat, Municipal council and Municipal Corporation. Scheduled Tribes Grants legal recognition to the rights of i) Projects for which this rule is applicable and Other traditional forest dwelling communities, Utmost care has been taken while structuring the project activities that during any Traditional Forest partially correcting the injustice caused by the stage of this project, no displacement or loss of livelihood will happen to any forest Dwellers forest laws. Makes a beginning towards giving dwelling scheduled tribe or other traditional forest dweller. However, at this stage, (Recognition of communities and the public a voice in forest and the project activities have not been elaborated, and some projects may be located in wildlife conservation the areas of forest dwelling scheduled tribes or traditional forest dwellers. Environmental Management Framework for ENCORE Program, 2019. Vol I xc Sector Acts Purpose Describe applicability to Project Components Forest Rights) Act”, ii) reasons for applicability 2006 This act will be applied if any project may have an impact on land of any description falling within any forest area and includes unclassified forests, un- demarcated forests, existing or deemed forests, protected forests, reserved forests, Sanctuaries and National Parks (2. d) with members or communities of scheduled tribe living in and depending on forest for livelihood needs, or forest villages (2. c and f). iii) procedures to be followed The State Level Monitoring Committee should monitor compliance of the provisions of Section 3(1)(m) of the Act, which recognizes the right to in situ rehabilitation including alternative land in cases where the forest dwelling Scheduled Tribes and other traditional forest dwellers have been illegally evicted or displaced from forest land without receiving their legal entitlement to rehabilitation, and also of the provisions of Section 4(8) of the Act, which recognizes their right to land when they are displaced from their dwelling and cultivation without land compensation due to State development interventions. https://tribal.nic.in/FRA/data/FRARulesBook.pdf Labor rights Contract Labor The Act provides for certain welfare measures to i) Projects for which this rule is applicable (Regulation and be provided by the Contractor to contract labor This act will be applied to (i) any office or department of the Government or a local Abolition) Act, and in case the Contractor fails to provide, the authority, or(ii) any place where any industry, trade, business, manufacture or 1970; same is required to be provided by the Principal occupation is carried on (5. b i and ii). As all the project activities are not finalized Employer by Law. It is applicable to: yet, here, the particular interventions where this act will be applicable is only a) To every establishment in which twenty or indicative. Some of the projects which may come under this act are the establishment more workmen are employed or were employed of SPMU, or establishment or augmentation of any other institution under the on any day of the preceding twelve months as capacity building. Livelihood development, and pollution abatement component. contract labor; Similarly, this act can be applicable to projects such as the establishment of the turtle (b) to every contractor who employees or who conservation center, creation of a mangrove gene pool under the conservation of employed on any day of the preceding twelve coastal resource components. months twenty or more workmen: (4. a and b) ii) reasons for applicability It is applicable to establishments that are not The license under this act will ensure the welfare of the contract labor regarding intermittent in nature which means the work conditions such as hours of work, fixation of wages and other essential amenities. should continue for more than 120 days in The principal employer is required to take a Certificate of Registration and the preceding twelve months, and if season then it Contractor is required to take a license from the licensing Officer. This license is should be performed for more than 60 days in a valid for a period of time and has to be renewed. Under certain conditions, there can year. be revocation, suspension, and amendment of licenses. For more details please see; http://labour.bih.nic.in/acts/contract_labour_regulation_and_abolition_act_1970.pdf Environmental Management Framework for ENCORE Program, 2019. Vol I xci Sector Acts Purpose Describe applicability to Project Components The Building and All the establishments who carry on any i) Projects for which this rule is applicable Other Construction building or other construction work and employ In relation to this project, the building and other construction workers (regulation of Workers 10 or more workers are covered under this Act. employment and conditions of service) act, 1996 is applicable to building or other (Regulation of All such establishments are required to pay Cess construction work” means the construction, alteration, repairs, maintenance or Employment and at rate not exceeding 2% of the cost of demolition, of or, in relation to, buildings, streets, roads, irrigation, drainage, Conditions of construction as may be notified by the embankment and navigation works, flood control works (including storm water Service) Act, 1996 Government. drainage works), generation, transmission and distribution of power, water works and the Cess Act of It applied to every establishment which employs (including channels for distribution of water), canals, reservoirs, watercourses, and 1996. 10 or more workers on any day of the preceding such other work as may be specified in this behalf by the appropriate Government, 12 months. by notification but does not include any building or other construction work to which the provisions of the Factories Act, 1948. ii) reasons for applicability These two Acts ensures workers’ welfare in any establishment, regarding safety and other basic provisions such as working hour, accommodation, creche, first aid and latrines. The State Welfare Board will conduct functions such as providing pension and immediate assistance to beneficiary in case of accident and sanction loans under special circumstances. iii) procedures to be followed Every establishment has to register to the registration officer within 60 days from commencement. Every building worker with age between 18 to 60 years, and who has been engaged in any building or other construction work for not less than ninety days during the preceding twelve months shall be eligible for registration as a beneficiary under this Act (12.a). Under this Act, the following for workers are defined such as fixing hours for normal working day, wage rate and overtime rate, maintenance of registers and records, prohibition of employment of certain persons in certain building or other construction works, accommodation, creche, first aid and canteen, and provision of latrines and urinals. (for details please see, chapter IV) For further information please see: https://indiacode.nic.in/bitstream/123456789/1989/1/199627.pdf http://legislative.gov.in/sites/default/files/A1996-28_0.pdf The Inter-State The Act is applicable to an establishment that i) Projects under for which this rule is applicable Migrant Workmen employs 5 or more inter-state migrant workmen This is applicable for any office or department of the Government or a local authority; (Regulation of through an intermediary (who has recruited or any place where any industry, trade, business, manufacture or occupation is carried Employment and workmen in one state for employment in the out (2.d). Under this project, this Act may be applied but not restricted to construction Environmental Management Framework for ENCORE Program, 2019. Vol I xcii Sector Acts Purpose Describe applicability to Project Components Conditions of establishment situated in another state). The activities regarding coastal protection, infrastructure development or conservation of Service) Act, 1979 inter- state migrant workmen, in an coastal or marine resources; activities for diversification of livelihood or capacity establishment to which this Act becomes building of institute or organization which requires the employment of 5 or more applicable, are required to be provided certain migrants workmen. facilities such as housing, medical aid, traveling ii) reasons for applicability expenses from home up to the establishment and In any such establishment which employs 5 or more migrant workmen, it is back, etc. applicable to safeguard regular and fixed wage rate and to ensure facilities such as displacement allowance, journey allowance and others. iii) procedures to be followed The contractor shall register with Labor Department if Inter- state migrant workmen are engaged. Adequate and appropriate amenities and facilities to be provided to workers - housing, medical aid, traveling expenses. For more information, please see: https://indiacode.nic.in/bitstream/123456789/7735/1/the_inter- state_migrant_workmen_%28regulation_of_employment.pdf The Child Labor The Act prohibits employment of children i) Projects under for which this rule is applicable (Prohibition and below 14 years of age in certain occupations and Utmost care has been taken while structuring the project activities that during any Regulation) Act, processes and provides for regulation of stage of this project no child will be involved in any occupation or process. 1986 employment of children in all other occupations However, at this stage, since the project activities have not been elaborated, this Act and processes. Employment of child labor is further elaborated on the terms to avoid any remote possibility of employing a child prohibited in the Building and Construction in any of these activities. For categories please see: Industry. https://labour.gov.in/sites/default/files/act_3.pdf ii) reasons for applicability While designing the projects, it has been taken into consideration that child labor will be engaged in any activity. However, under circumstances, if any of the project include the above mentioned, or any other activity from the Act should not involve employing child labor. iii) procedures to be followed Every occupier in an establishment who employs or permits a child to work shall inform the inspector of a written notice. The Street Vendors GOI recently enacted the act that specifically i) Projects under for which this rule is applicable (Protection of aims to protect the rights of urban street vendors During the design phase, it has been taken care of that loss of livelihood will be Livelihood and and to regulate street vending activities. It prevented. However, if there are temporary displacement issues or inconvenience Regulation of Street provides for Survey of street vendors and occurred due to construction activities this Act will ensure the rights of the street Vending) Act, 2014 protection from eviction or relocation; issuance vendors of certificate for vending; provides for rights ii) reasons for applicability and obligations of street vendors; development Any development activity related to this project might cause relocation of street vending plans; organizing of capacity Environmental Management Framework for ENCORE Program, 2019. Vol I xciii Sector Acts Purpose Describe applicability to Project Components building programs to enable the street vendors to exercise the rights contemplated under this Act; undertake research, education and training programs to advance knowledge and understanding of the role of the informal sector in the economy, in general and the street vendors, in particular and to raise awareness. Note: In the Government of India amends the provisions in the various acts or notifications under the Coastal Zone Notification, En vironment Protection Act, Environment Rules or any other applicable Act / Rule during the course of implementation of the project, then compliance to the amended rules and regulations, as applicable under the revised notification, will become mandatory. Environmental Management Framework for ENCORE Program, 2019. Vol I xciv Annexure IV: List of Stakeholders Consulted for ESMF Preparation A) State Level Public Consultations State-wise Public Consultations on ENCORE and ESMF for ENCORE STATE: Karnataka The expert committee visited the following sites during the visits held in 2018 and 2019. Various projects which can be taken at particular sites were decided after the consultation with the local communities especially fisher folks in various places. Project details and applicable ESMF procedures were discussed. The details of the places of visit and activities suitable for the ICZM project to particular sites were given below. Sl. Name of the GPS Names of the Contact No. Discussions and suggestions No. Location Co-ordinates. local communities interacted 1 Nadipatna, and N 130 07’57.4” Sridhar Suvarna 9845843197 • Poly house for fish drying. place near E 740 45’ 45.9” UmeshKarkera • Artificial Reef creation. “Muttalive” RohithKotyan • Boat hauling machines. where Kamini N 130 06’59.6” HemaKarkera • Pollution of KaminiRiver– river joins E 740 45’ 57.4” ShekharKanchan treating discharge point of SeaPadubidri, LokeshKarkera UPCL and other Industrial Udupi District 9902209725 area that are entering to river CRS-PPP model. • Rejuvenation of Mangrove area. • Proposal for Eco-smart village. • Coastal and mangrove tree park. • Mangrove eco trails. • Floating jetty • Sewage treatment/Solid waste management - Using Poly crack Technology - Grey water Treatment. - Environment and socially acceptable projects 2 Uchila and Kapu N 130 11’28.8” • Artificial Reefs creation. Rocky Out Crop E 74044’ 42.3” • Formation of traditional Udupi District fishermen SHG. • Aqua tourism in PPP model. 3 MattuUdupi N 130 16’06.5” Ashok • Rejuvenation of Mangrove District E 74043’ 38.1” Ramesh Salian plantation and mangrove Harish Tingalaya based aqua culture practices. N 130 16’47.6” Shashi Kumar 9845878225 • Artificial Reefs creation. E 74043’ 44.1” Bangera • Aqua tourism in PPP model. • Sea green mussel cultivation N 130 16’47.6” by preventing unscientific E 74043’ 44.1” Environmental Management Framework for ENCORE Project, 2019. Vol I xcv Sl. Name of the GPS Names of the Contact No. Discussions and suggestions No. Location Co-ordinates. local communities interacted harvesting by Kerala fishermen’s. 4. Padukeri Village • Artificial reef creation. Udupi District • Floating jetty • Coastal Island view tree park. • community based Island tourism • Island bird watching tourism • Water sports activity • Hobby fish angling on break water • different type of molluscs diversity conservation and interpretation centre. • Island bird interpretation centre. • Scuba diving • snorkeling • ornamental fish hatchery centre • Solar lights • Hobby off shore fishing. 5. St. Mary’s land, • Floating Jetty Malpe Coast • Marine Theme Park • Solar powered Desalination plant & bottled supply to tourist and collecting back bottles. • GSI importance • Zonation of area based on bathymetric survey • Demarcation of 14ac. of land into marine theme park • GSI site. • Bird watching area • Bird nesting area. • Coconut garden • Undisturbed area • Medication yoga centre. • Fish Angling. • Scuba diving • Snorkeling • Bird island tour • Dolphin watching • Marine Biodiversity awareness interpretation centre. • Rain water harvesting • Solar lights Environmental Management Framework for ENCORE Project, 2019. Vol I xcvi Sl. Name of the GPS Names of the Contact No. Discussions and suggestions No. Location Co-ordinates. local communities interacted • Sea weed, Sea grass, sea anemone, sea urchins, insitu conservation • Reef coral conservation. 6. Hungarcutta N13026’46.8” • House Boat house tourism. E 74042’ 05.4” • Home stay. • Degutting machine to fishermen’s • Fish cold storage unit as PPP model. • Fish Hygiene and packaging techniques training. 7. KundapuraKasa N 130 26’17.8” ThimmappaKharvi • Treating Sewage that is ba E 74042’ 21.0” BhaskarPuthran presently directly discharged KundapuraKodi GovindaKanchan 9845316706 to Kundapura estuaries. Udupi District N 130 26’56.0” • Mangrove boating trail. E 74042’ 14.5” • Aqua Sports. • Fish angling activity on breakwaters. • eco-tourism activities • Kodi beach with shelter belt plantation through local communities. • Clam live (Relaying) storage facility near Kasaba in the estuary • Cage culture • Crab fattening in backwaters. 8. Alvekodi, N 13051’06.6” RavindraKharvi 9535375878 • Boat hauling machines. Uppunda E 74036’42.1” BabuKharvi • Artificial Reef creation Udupi District (Scraped Railway bogies/wagons or scrapped boats) • Rain water harvesting for drinking and domestic use. • Gas connection. • Solar lights. • Hatchery for mariculture • Signal Buoys at rocky outcrops in shore. • Crab fattening. • Mangrove Rejuvenation through VFC. • Establishing Mini Fish Processing units. 9. Kali Estuary N 140 51’24.8” • Cage culture. (Villages: E 74010’ 25.4” • Low salinity Seaweed Sunkeri, culture like Garcinia. Ghotegali, • Prawn culture. Hankon, • Aqua sports. Environmental Management Framework for ENCORE Project, 2019. Vol I xcvii Sl. Name of the GPS Names of the Contact No. Discussions and suggestions No. Location Co-ordinates. local communities interacted Nandangadda, • Scuba diving. Siddar) • Parasailing. Karwar, Uttara • Dolphins and Island tourism. Kannada • Coral transplantation at District Devgad Island. • Sea weed cultivation in Majali. • Eco-tourism activities. • Establishing Mini Fish Processing units at Karwar. 10. Nusikote, N14033’05.4” HanumanthaHarik 9980593780 • Crab fattening techniques Aghanashini E 74022’ 52.6” antha • Mangrove honey production Estuary,, Kumta, N14033’04.7”E ArunRamnayak • Sustainable management of U.K District 74022’ 38.0” VenkateshHarikan crustacean fishery th • Mangrove gene pool & blue JagadeeshHarikant 9945795619 carbon 150 families • Mangrove nursery • Value edition for crustacean fishery products & By- products • Mangrove eco-tourism guide training • Bird watch guide & tower construction • Skills on Rejuvenation of Gajani forming techniques • Training on Sustainable fishing techniques for traditional fishers • Value addition for traditional dry prawns units. • Home stay • Eco-Guide training for Bird watching & crab watching. • Fisheries Road. • Ancient local deity temple showcasing (Babrulingeshwara). • Community Hall. • Gas connection. • Solar Lights. • Hill top view point. 11. Paradise Beach, • Beach Development PPP Gokarna U.K. model by JLR. District • Trekking Path. • Shelter belt Plantation. • Water Harvesting. • Establishing Mini Fish Processing units at Tadadi harbour. Environmental Management Framework for ENCORE Project, 2019. Vol I xcviii Sl. Name of the GPS Names of the Contact No. Discussions and suggestions No. Location Co-ordinates. local communities interacted • Establishing Solar Fish dryers at drying yard of Tadadi fisheries harbour. 12. Apsarakonda N 14013’47.8” Suresh 8095346903 • Sand dunes tree park & Beach E 74026’ 34.0” GopalKharvi reconstruction of beach Honnavar, U.K. Ganapathi Krishna vegetation (Forest dept). District N 14013’48.2” Tandel • Conservation of “Kannajji E 74026’ 34.5” YashawanthNagu sacred grove” of Apserkonda Tandel (coastal grove) GajananaKeshavK • Coral Transplantation. harvi • Turtle habitat conservation. • Ornamental fish culture/ breeding. • Zero solid Waste village/ plastic free village. • Seaweed culture. • Artificial reefs. • Water sports and hilltop gliding. • Anganawadi and Community hall. • Public toilets & Washrooms. • Home Stay. • Parking facility. • Solar lights. • Gas connection. • Capacity building in aqua sports, paragliding, Life guard training. 13. Murudeshwara- N 14007’38.3” • Beach development facilities Byloor Beach E 74028’ 57.6” and Beach tree park. Manki, • Turtle conservation. Uttara Kannada • Giant clam recovery District programme at Netrani Island. • Coral reef transplantation. • Scuba diving. • Pelagic bird watching and Eco-tourism destination to Netrani Island. • Water sports with paragliding • Home Stay. • Solar lights. • Gas connection. • Capacity building in aqua sports, paragliding, Life guard training. 14. NandiniandSha N 130 05’ 54.9” PanduKotyan • Bival Culture. mbahavi Estuary E 74047’ 04.9” Leela • Mangrove Plantation through Mulky Vanaja local communities. Environmental Management Framework for ENCORE Project, 2019. Vol I xcix Sl. Name of the GPS Names of the Contact No. Discussions and suggestions No. Location Co-ordinates. local communities interacted D.K. District RajeeviChitrapu • Mangrove Eco- trail • Cage culture of Sea Bass. • Prawn culture using Bio flocculation Technique. • Boat house tourism. • Surfing and Water Sports Activity. • Artificial Reef at Surathkal lighthouse. 15. Gurupur- N 120 50’46.7” Vivian D, Souza 8951945229 • Industrial and Domestic Netravati E 74052’ 28.4” Francis Pinto Sewage Treatment plant at Estuary Gurupura Estuary in PPP D,K, District model near 10 Discharge points namely Hoige Bazar, Kandathpalli, Kudroli and BangraKulur and other discharge points up to Malavoor dam. • Connecting Costal Fisheries Road from Talapady (Kerala border NH66) to Sasihithlu (Mulki NH66) and developing it in to Marine Drive Road AS PPP model. • Government land on the seaward side of the road can be developed as a thick shelter belt. • Eco tourism: Boating in Estuary including Kudrus (islands) of both the rivers. • Developing network of online fish marketing engaging local fisherwomen self-help groups in collaboration with Department of Fisheries. • Protecting Mangroves in Industrial hub as lung space to Mangalore city as CSR- PPP model, by fencing of Mangroves in and around Kudumbur river at Bykampady Industrial Area. • Mangrove tree park 16. Bappanadu- • Crab farming Kolchikambla • Oyster family, clam relaying village • Cage culture • Boat house • Mangrove safari Environmental Management Framework for ENCORE Project, 2019. Vol I c Sl. Name of the GPS Names of the Contact No. Discussions and suggestions No. Location Co-ordinates. local communities interacted • Ice plant-PPP • Sewage treatment (grey water treatment) • Polycrack technology • Depuration unit • Fish cold storage • Solar lights 17 Shiroor, PrakashKharvi 8970326653 • Shelter belt, Floating Jetty Kalihithlu, Hadavinakone, NagarajMoger 8150976478 Alvegadde Kalkodi 18 Hadin Beach, VFC • Eco tourism huts, Para Bhatkal gliding, Children Play Area 19 Bengre Beach, Yashodhara 9739127431 • Sand stabilization between Alvekodi, Alvekodi and Thengingundi, Bhatkal • Watersports activity, Breakwater for natural harbour, Artificial reef 20 PavinKurve ManjunathHarikan • Shelterbelts, Boat hauling Beach th machine, BasaavarayaDurga Sridhar 9902809197 Heritage site, Island tourism. NagarajHarikanth 21 Majali Beach Mahindra S Kunti 8050926992 • Solar light, Boat hauling machine, Shelterbelts, Floating jetty, Artificial reefs 22 Harwada Bay JitendraBhoote, 7795787846 • Open Sea cage culture, Sea Ashok weed cultivation, Solar street BadaniJadhav lights and Solar light for the 7026037258 boats • 20’ fibre boat • Electric Engine • Artificial reef • Petrol subsidy • Icebox/ Insulated box 23 Belikeri beach • Sea weed cultivation, tree park 24 Keni Beach Santhosh S 9900760213 • Solar light for boats, Chodonkar Floating Jetty SudeshBhosle 9980105594 25 Mirjan Fort, Govind 827761138 • Park inside Mirjan Fort. Mirjan, Kumta Desai, CA, ASI 08385- 226555 26 Vannalli Beach, • Jetty, Fish drying polyhouse, Kumta Tree Park, Shelter Belts, Adventure sports, Boat hauling machines Environmental Management Framework for ENCORE Project, 2019. Vol I ci Sl. Name of the GPS Names of the Contact No. Discussions and suggestions No. Location Co-ordinates. local communities interacted 27 Baggundi visit Prof. • Meeting with farmers & land RamachandraBhat owners & residents. , M.J. shetty, • Discussed about traditional Yogeshsanil. fishing festival, temple deity Mohandas shetty. KoteBabbuswamy, Crop Chandrahaspoojar area of Baggundi, pollution y,Devadasshetty. aspects etc. 28 Honnavara visit • Meeting held on the forenoon of August 13, 2019 to brief the stakeholders about ICZMP and to develop a proposal for establishing Marine Conservation Reserve in HonnavarTaluk, at the office of the DCF, Honnavar, Forest Division, Honnavar Photos: Environmental Management Framework for ENCORE Project, 2019. Vol I cii Scientists Present: 1) Dr.A.P. Dinesh Babu, Principal Scientist, CMFRI, Mangaluru 2) Dr.(Mrs.)Sujitha Thomas, Principal Scientist, CMFRI, Mangaluru 3) Dr.K.M. Rajesh, Senior Scientist, CMFRI, Mangaluru 4) Dr. G.B. Purushottama Scientist, CMFRI, Mangaluru 5) Dr.PrakashMestha, IISc,Honnavara Unit, Honnavara Officials present: 1) Sri Prabhakaran, IFS, Deputy Conservator of Forest, Kundapur Division 2) Dr. Y.K. Dinesh Kumar, Regional Director, Environment, Mangaluru 3) Sri PrasannaPatagar, Regional Director, Environment, Karwar 4) Sri Mahesh Kumar U, Senior Assistant Director of Fisheries, RD (ENV) 5) Sri Ravindra RFO, Honnavara. 6) Sri Mohan Bidri RFO, Hiregutti. 7) Sri Ragavendra RFO, Karwar. Environmental Management Framework for ENCORE Project, 2019. Vol I ciii STATE: ODISHA Environmental Management Framework for ENCORE Project, 2019. Vol I civ A Brief Report of the Public Consultation undertaken with Community for Coastal Protection at Ramayapatna, Mangala River, Ramachandi and Eco-Tourism Project at Jahania The proceedings of the meeting were prepared in local language i.e Odia with a view to facilitate proper conversation during consultation process. For better understanding of all concerned, a brief of the consultation process is given below: Community meetings were held at three erosion prone areas at Ramayapatna, Mangala river and Ramachandi beach. In the meeting, the community members were made aware about the coastal erosion protection measures to be undertaken at Mangala River, Puri, Ramachandi beach, Konark and Ramayapatna village, Ganjam district. In the meeting, it was also informed that during the implementation of protection measures the community members will not be displaced. The area will be protected from soil erosion and there will be no harm to the environment during implementation of the Project and ESMF will be followed. The protection measure will enhance the life and livelihood of the community especially the fishermen who are dependent on the coastal area. This will also protect the villages during natural disasters like flood and cyclone and community members will not undergo migration and can live without fear in their respective villages. This apart, the Project will reduce soil erosion, protect the environment and enhance the livelihood of the community. Community meeting was also held with the Vana Surakhya Samiti (VSS) members at Jahania ecotourism site at Astaranga, Puri. The members were made aware about the proposed ecotourism site and the facilities to be created in the area. Some of the infrastructures to be created at the site are 10 fabricated cottages, picnic platforms, toilet facilities, Children Park and parking area. The VSS members expressed their willingness to be involved during the development of the eco-tourism site, be trained and subsequently manage the facility wherever required after completion of work. Environmental Management Framework for ENCORE Project, 2019. Vol I cv Ramyapatna Environmental Management Framework for ENCORE Project, 2019. Vol I cvi Environmental Management Framework for ENCORE Project, 2019. Vol I cvii Ramachandi Environmental Management Framework for ENCORE Project, 2019. Vol I cviii Environmental Management Framework for ENCORE Project, 2019. Vol I cix Mangla River Environmental Management Framework for ENCORE Project, 2019. Vol I cx Environmental Management Framework for ENCORE Project, 2019. Vol I cxi B) Consultations on Draft ESMF with SPMUs Sl No Name Designation Contact Details 1. Dr V. Rajagopalan IAS Former Secretary, MoEF&CC (Retd) 2. Dr. Dinesh Kumar DFO& Regional Director, Ecology and 9482507212 Environment, Government of Karnataka 3. Prasanna Krishna Patgar RD, Environment, Karwar, Karnataka 9483808881 4. Ramesh Babu R RD Environment, Uduppi, Karnataka 9481581888 5. PK Panigrahi Oceanographer, SPMU, ICZM, WB 9674299688 6. Dr. Debasis Roy APD, ICZMP, Odisha droy58@gmail.com 9437227684 7. Geethanjali, IFS Additional Director & PD, ICZMP-TN 9488932524 8. D. Easwaran ACF & APD, ICZMP-TN 9884507974 9. Thiru S. Karthikeyan Procurement Officer, ICZMP-TN 9655170900 10. Smt S Lkshmi Sundaram Expert, ICZMP-TN 9500604656 11. Dr. R Prasanna Research Associate, ICZMP-TN 9944211333 Venkatesh 12. Dr M. Sridevi Programme Officer, ICZMP-TN 9566167156 13. Dr P Radha Priya GIZ-Climate Change consultant, ICZMP-TN 7867016377 14. P Pookaya Director, DST, Lakshadweep 15. C.N. Shajahan Superintending Engg, Lakshadweep 9447047850 16. Dr Idrees Babu Scientist, DST, Lakshadweep 9446037060 17. Dr. A. I. Mushim Scientist, DST, Lakshadweep 9446357060 18. T.M. Abdul Shakir Technical Assistant, Lakshadweep 9446420918 19. Dr Sunder Vadivelu IAS Secretary S&T, Lakshadweep 20. Dr John C. Mathew Environment Program Manager DoECC, epm.envt@kerala.gov.in Kerala 9446058120 21. Dr T T Ajith Kumar National Bureau of Fish Genetic Resources (NBFGR), Kochi 22. Dr. Murugesan Director cum Spl. Sec. Environment, Odisha 9449055389 23. Dr. Ajit Kumar Pattnaik Former PCCF, Odisha IFS, (Retd.) 24. Kiran G IFS The District Forest Officer, Thiruvallur 9886622239 District 25. Naga Sathish The District Forest Officer Kancheepuram 7579400158 26. Abhishek Tomar The District Forest Officer Villupuram 8839327945 27. Abhishek Tomar The District Forest Officer Cuddalore 8839327945 28. Dr. K Arivoli. SFS The District Forest Officer Thiruvarur 29. S. Gurusamy The District Forest Officer Thanjavur 30. N. Senthil Kumar The District Forest Officer Thoothukudi 8575534688 31. K. Thirumal IFS The District Forest Officer Tirunelveli 9626212412 32. Anand S IFS The District Forest Officer Kanyakumari 9442186292 33. T.K. Ashok Kumar IFS Wildlife Warden Ramanathapuram, Tamil 8940813720 Nadu 34. K.Kalamegam, Environment Engineer DSTE Govt of 9494566433 Puducherry 35. R Sagaya Alfred Sr. Scientific Officer, DSTE, Govt of 9443503314 Puducherry 36. S. Kalanithi, IFS Wildlife Warden NGPT 9489796979 37. Dr S Kanmani Prof & Director CES, Anna University 9444585805 38. Dr M Krishnaveni Professor, Centre for water Resources, Anna 9840202974 University Environmental Management Framework for ENCORE Project, 2019. Vol I cxii Sl No Name Designation Contact Details 39. Dr M. Jeyanthi Central Institute of Brackish water 9444945700 Aquaculture (CIBA), Chennai jayanthiciba@gmail.com 40. Dr. R Parthasarathy Director, Gujarat Institute of Development 9974262270 Research (GIDR) 41. Prof A.L. Ramanathan Jawaharlal Nehru University, New Delhi 9810689243 42. Dr K.V. Thomas Dean, Faculty of Climate Variability and 9400333128 Aquatic Ecosystem, Kerala University of Fisheries and Ocean Studies 43. Dr. Ch Shrinivasa Rao Director, ICAR-National Academy of Agricultural Research Management 44. Dr P Krishnan Principal Scientist 9498050062 Agricultural Research Systems Management, ICAR National Academy of Agricultural Research 45. Dr. P. Madeswaran Scientist G National Centre for Coastal 9445202984 Research 46. Dr. R.S. Kankara Scientist F, NCCR kankara@nccr.gov.in 47. Dr. K. Venkatarama Scientist F, NCCR 9968293675 Sharma 48. Dr Pravakar Mishra Scientist F, NCCR 9444054364 49. Dr Uma Sankar Panda Scientist E, NCCR 9042687777 50. Dr K. Ramu Scientist E, NCCR 9444721294 51. Dr G Dharani Scientist F, Marine Biotechnology, National 9444931947 Institute of Ocean Technology 52. Dr M V Ramana Murthy Group Head Ocean Structure National Representative sent Institute of Ocean Technology 53. Dr Dilipkumar Jha Scientist B, MBT, NIOT 9445653217 54. Dr Tune Usha Scientist F NCCR 9444919970 55. Dr M K Ramesh Professor of Law, Chair Professor (Urban mkramesh@nls.ac.in Poor and the law national Law School of India University) 56. Dr S.K. Sasamal Scientist G NRSC, Hyderabad 57. Sh Ch Venkateswara Rao Director, Survey of India 58. M Santhosh Dy Suptdg. Surveyor Survey of India 59. K Chandran Officer Surveyor Survey of India 60. Dr. C Raghunathan Rep of Director, ZSI 61. Dr Baban Ingole National Institute of Oceanography 62. Rajkumar Rajan MBRC Chennai Marine Biology Regional Centre Zoological Survey of India 63. Christina Smith US consulate Chennai Political /Eco Affairs smithca12@state.gov 64. Dr Johnson B CMFRI, Mandapam Scientist 8870380782 65. Dr. L Ranjith CMFRI, Tuticorin Scientist 8144701198 66. Dr T T Ajith Kumar ICAR NBFGR 9443001785 67. Satya kiran Raju A Scientist D, NIOT Chennai 9789893975 68. A G PUnneil Director CIBA 9445019555 69. J Dhivybarathi DOE Tamil Nadu 9842567093 70. Dinesh Merchant M K Aromotics Limited 8220853664 71. Ralph Cantral Senior Advisor, Office for Coastal Ralph.cantral@noaa.gov Management, US NOAA 72. Dr. Nigel Bradley Envirostrat, New Zealand Nigel.bradley@envirostrat.co.in 73. Dr. Peter Ricketts President, Acadia University, Co-Founder Peter.ricketts@accdiou.ca and Past President, Canada Coastal Zone Management Association 74. Dr. Milton L. Asmus Professor, Universidade Federal do Rio docasmus@furg.bt Grade (FURG), Brazil Environmental Management Framework for ENCORE Project, 2019. Vol I cxiii Sl No Name Designation Contact Details 75. Dr. Rhoda Catherina Director, Marine Geography, Cardiff ballingerrc@cf.ac. Ballinger University, UK 76. Nancy Bermas Senior ICZM Specialist, PEMSEA nbermas@pemsea.org 77. Dr. Keita Furukawa Head of Marine Environment Division at National Institute for Land and Infrastructure Management, Japan 78. Felix Leinemann Head of Unit, Blue Economy Sectors, On Skype call Aquaculture and Maritime Spatial Planning European Commission 79. Dr. Indumathie Senior Policy Advisor, GOF Hewawasam 80. Richard Delaney President and CEO, Center for Coastal delaney@coastalstudies.org Studies, and Senior Coastal and Marine Policy Specialist, GOF 81. Dr. Biliana Cicin-Satin President, GOF bcs@udel.edu 82. Brian Cortes Assistant to President, GOF bcortes@udel.edu 83. A. Sita Ramakrishna Task Team Leader, ICZM Project, The 9899901709 World Bank aramakrishna@worldbank.org 84. Tapas Paul Task Team Leader, ICZM Project, The 9810345280 World Bank traul@worldbank.org 85. Deepa Balakrishnan Env. Specialist, ICZM Project, The World 8547084045 Bank dbalakrishnan1@worldbank.org 86. Siddharth Merchant ICZM Project, The World Bank sidmerchant@worldbank.org 87. Krishnamurthy S Financial MS, ICZM Project, The World 9810404471 Bank skrishnamurthy@worldbank.org 88. Dr Shailesh Dodia Sr. Scientific Officer, SICOM, MoEFCC, 9899755747 GOI 89. Priyanka Bhandari ICZM Planner, SICOM Sicom.priyanka@gmail.com 90. Garima Sharma Environment Engineer, SICOM garima.sicom@gmail.com C) Consultation with Officials Sl.No. Name Designation National/State Date: 05 April, 2019 Location: Ground Floor Pt Deendayal Antyodaya Bhavan, CGO Complex Lodhi Road 1. Ritesh Kumar Singh Joint Secretary, MoEFCC Project Director (PD), NPMU 2. Satyendra Kumar Additional Project Director Assistant Project Director (APD), NPMU 3. Shayamal Binoy Tikadar Project Director, SPMU Gujarat SPMU 4. Nischal Joshi Sr. Manager, SPMU Gujarat SPMU 5. K Ravi Chandran CCF & Secretary Daman Diu SPMU 6. Sanjiv Joglekar OSD GCZMA Goa SPMU 7. Vinay Kumar Katt CCF, Director Karnataka SPMU 8. Dinesh Kumar DCFG Karnataka SPMU 9. Veena N Madhavan Director, Env & Climate Change Kerala SPMU 10. P Kalariarasan Environmental Engineer Kerala SPMU 11. P Pookaya Project Director, Directorate, Science & Lakshadweep Technology, Administration of UT SPMU 12. Jayanthi M Member Secretary, TNSCZMA & Director Tamil Nadu SPMU 13. Kalamegam Environmental Engineer Puducherry SPMU Environmental Management Framework for ENCORE Project, 2019. Vol I cxiv Sl.No. Name Designation National/State 14. Svermala Additional Project Director Andhra Pradesh SPMU 15. Tripti Shah Additional Project Director, ICZM West Bengal SPMU 16. B K Samal Additional Project Director Odisha SPMU Odisha SPMU 17. Debasish Roy Additional Project Director Odisha SPMU Odisha SPMU 18. Madhu K Garg Commissioner, OSD Andaman & Nicobar SPMU 19. R Ramesh Director NCSCM, Chennai 20. Purvaja R Scientist G NCSCM, Chennai 21. Dripta Nag ICZM Planner SICOM, NPMU 22. Priyanka ICZM Planner SICOM, NPMU 23. Garima Sharma Environment Engineer SICOM, NPMU 24. 25. Milen F. Dyoulgerov Sr Environment Specialist and Task Team The World Bank Leader (TTL), ENCORE 26. A S Ramakrishna Sr Environment Specialist and Co-TTL, The World Bank ENCORE 27. Deepa Balakrishnan Environmental Specialist and Safeguard The World Bank Specialist, ENCORE 28. Om Prakash Consultant - Procurement The World Bank 29. Sanjeev Kumar Procurement Specialist The World Bank 30. Sidharth P Merchant Research Analyst The World Bank 31. S Krishnamurthy Sr Financial Management Specialist The World Bank 32. Simon Chirwa Lead Procurement Specialist The World Bank 33. Richard F, Delaney Sr Coastal & Marine Policy Specialist Consultant (Consultant) 34. Indumathi Hewawasam Sr. Coastal & Marine Policy Specialist Consultant (Consultant) 35. Nigel Bradly Consultant Consultant, Envirostat, New Zealand th Date :- 24 January, 2018 Location: Room No. 111 Paryavaran Bhavan, CGO , Lodhi Road Complex 36. A K Mehta Additional Secretary National PMU 37. Ritesh Kumar Singh Joint Secretary National PMU 38. Arvind Kumar Nautiyal Additional Secretary Director National PMU 39. B.S.S. Prasad Member Secretary, Andhra Pradesh Andhra Pradesh pollution Control Board & Member SPMU Secretary Andhra Pradesh Coastal Zone Management Authority 40. Sanjeev S Joglekar Officer of Speical Duty (OSD), Dept of Goa SPMU Environment 41. A. K. Saxena P.D. Gujarat SPMU Gujarat SPMU 42. Nischal Joshi S.M.P. Gujarat SPMU Gujarat SPMU 43. P. Harinarayan Senior Scientist, Kerala Kerala SPMU 44. Kalaiarasan Environmental Engineer, Karnataka Karnataka SPMU 45. K.H. Vinaya Kumar Chief Conservator of Forest (CCF) & Karnataka SPMU Director, Environmental Management & Policy Research Institute (ESMPRI) 46. Balram Meena Director, Science & Technology (S&T) Lakshadweep UTLA SPMU Environmental Management Framework for ENCORE Project, 2019. Vol I cxv Sl.No. Name Designation National/State 47. S.B. Sadashiv Under Secretary-Scientist, Environment Maharashtra Department Maharashtra SPMU 48. Susanta Nanda P.D. Odisha SPMU Odisha SPMU 49. M. Dwarkanath Director & member secretary, Coastal Zone Puducherry SPMU Management Authority, Puducherry 50. A.V. Venkatachalam Director & Member Secretary Coastal Zone Tamil Nadu Management Authority SPMU 51. Rajender Jakher APD, West Bengal SPMU West Bengal SPMU 52. Ramesh Ramachandran Director NCSCM Chennai 53. Purvaja Ramchandran Scientist G NCSCM, Chennai 54. Akash Sharma Controller- F&A, SICOM SICOM 55. Mohit Gupta Finance Consultant SICOM 56. Sanjay Jhalla PMC, SICOM SICOM 57. S K Mamgain Sociologist, SICOM SICOM 58. Chetna Jain Documentation Consultant SICOM 59. A. Sitaramakrishna Sr. Environmental Specialist, The World The World Bank Bank 60. Deepa Balakrishnan Environmental Specialist, The World Bank The World Bank 61. S. Krishnamurthy Sr. Financial Management Specialist, The The World Bank World Bank Date: 23rd April, 2018 Location : Teesta, Conference Hall, MoEFCC, Jor Bagh, New Delhi 62. A K Mehta Additional Secretary, MoEFCC National PMU 63. Ashok Saxena PCCF, Project Director, GSPMU Gujarat SPMU 64. B K Samal Additional Project Director, Odisha SPMU Odisha SPMU 65. PadmaMahanti Director, Environment & Climate Change Kerala SPMU 66. A Subba Rao Sr Environment Engineer, Andhra Pradesh Andhra Pradesh Pollution Control Board SPMU 67. A. V. Venkatachalam Director Environment Director Chennai, Tamil Nadu SPMU 68. N. Srinivasa Rao Scientific Officer Puducherry SPMU 69. Ramachandra Principal Secretary Karnataka SPMU 70. Rajendra Jakher Additional Project Director, ICZMP West Bengal SPMU 71. R Ramesh Director, NCSCM Chennai SPMU 72. Sanjiv Joglekar OSD GCZMA Goa SPMU 73. A. Sitaramakrishna Sr. Environmental Specialist The Word Bank 74. Deepa Balakrishnan Environmental Specialist The Word Bank 75. Moushumi Chatterji Consultant The Word Bank 76. Akash Sharma Controller- F&A, SICOM SICOM 77. Shailesh K Dodia Scientific Officer SICOM 78. Mohit Gupta Senior Accountant SICOM 79. Dripta Nag ICZM Planner/ Social Specialist SICOM 80. Priyanka ICZM Planner SICOM 81. Saurabh Sharma Project Engineer SICOM 82. Garima Sharma Environment Engineer SICOM 83. Shailendra Mamgain Sociologist (Consultant) SICOM Environmental Management Framework for ENCORE Project, 2019. Vol I cxvi Appendix V: Regulated Activities in CRZ Zones and Institutional Responsibility CRZ Zone Brief Boundary Outline Regulated Activities Responsible Entities CRZ-I A Ecologically sensitive areas such as Mangroves, Salt marsh, Exploration and extraction of natural gas and oil NCZMA Coral reef, Seagrass, Turtle nesting ground, Bird nesting Construction and expansion of air strips, helipads ground, Horse crab habitat, Mudflats, Sand dunes, Archaeological & heritage sites and Marine Protected Areas CRZ-I B Area between Low Tide Line and High Tide (Intertidal zone) Port development NCZMA/SCZMA Defence activities NCZMA Oil and gas exploration CRZ-II The developed land areas up to the shoreline, within the Oil and gas exploration, Fencing of premises NCZMA existing municipal limits or in other existing legally Domestic and commercial use of ground water SCZMA designated urban areas. (Area built-up with a ratio 50% resource private plots = 50% public purpose) Tourism related and construction activities NCZMA Fishing/Aquaculture SCZMA/Local Panchayat Infrastructure and coastal development required for inhabitants Defence activities NCZMA Renovation of religious values SCZMA/NCZMA/Local Panchayat CRZ-III A Areas where has population density is more than 2161/sq km Mining NCZMA as per 2011 census base. Area up to 50 meters from the HTL Deforestation activities NCZMA/SCZMA on the landward side shall be earmarked as the ‘No Domestic and commercial use of ground water SCZMA/Local Panchayat Development Zone (NDZ). resource Manufacturing and commercial usage of plastic NCZMA/SCZMA items Tourism related and construction activities Disposals/discharges of sewage and pollutants NCZMA/SCZMA/Local Panchayat Air and vehicular pollution NCZMA/SCZMA Infrastructure and coastal development required for SCZMA/ Local Panchayat inhabitants including residential houses Fishing/Aquaculture SCZMA/ Local Panchayat Defence activities NCZMA Renovation of religious values SCZMA/ Local Panchayat Hydroelectric projects NCZMA Environmental and Social Management Framework for ENCORE Program, 2019. Vol I cxvii CRZ Zone Brief Boundary Outline Regulated Activities Responsible Entities Small scale green industries SCZMA/ Local Panchayat CRZ-III B Areas where has population density is less than 2161/ Sq.Km Mining NCZMA as per the 2011 census base. Area up to 200 meters from the Deforestation activities NCZMA/ SCZMA HTL on the landward side shall be earmarked as the ‘No Oil, gas exploration and extraction NCZMA Development Zone (NDZ). Protection of hill slopes and river beds NCZMA/SCZMA Agriculture SCZMA Domestic and commercial use of groundwater SCZMA/Local Panchayat resource Manufacturing and commercial usage of plastic SCZMA/Local Panchayat items Introduction of exotic species NCZMA/SCZMA Disposals/discharges of sewage and pollutants SCZMA/Local Panchayat Air and vehicular pollution SCZMA/Local Panchayat Fishing/Aquaculture SCZMA/Local Panchayat Infrastructure and coastal development required for SCZMA/Local Panchayat inhabitants including residential houses Defence activities NCZMA Hydroelectric projects NCZMA Renovation of religious values NCZMA/SCZMA Small scale green industries NCZMA/SCZMA CRZ-IV A The water area and the sea bed area between the Low Tide Oil, gas exploration and extraction NCZMA Line up to 12nm on the seaward side Ballast water, ship washes and treated effluents NCZMA Disposal of treated sewage in sea NCZMA/SCZMA Use of renewable energy resources NCZMA/SCZMA Shipping in designated area NCZMA Port development NCZMA CRZ-IV B The water area and the bed area between LTL at the bank of Oil, gas exploration and extraction NCZMA the tidal influenced water body to the LTL on the opposite Disposal of treated sewage in sea NCZMA side of the bank, extending from the mouth of the water body Ballast water, ship washes, treated effluents NCZMA/SCZMA at the sea up to the influence of tide, i.e., salinity (5 ppt) Use of renewable energy resources NCZMA/SCZMA during the driest season of the year. Shipping in designated area NCZMA Port development NCZMA Source: NCSCM Environmental and Social Management Framework for ENCORE Program, 2019. Vol I cxviii Prohibited/Regulated/Permitted Activities Under Various Environment Acts in India93 CRZ-III CRZ-IV CRZ-II CRZ-I Broad Sl. No Activity Remarks Category Mining of land, rocks and other X X X X CRZ 2011/ICRZ 2011 substrata CRZ 2011/ICRZ 2011, Note: Mining of rare minerals which is not Mining of rare minerals ✓ ✓ ✓ ✓ available outside the CRZ areas Mining of sand from nesting and 1. Mining breeding grounds of endemic and X X X X CRZ 2011/ICRZ 2011 endangered species ESZ guidelines (2011) provides regulation will not prohibit for digging Commercial mining X X R X of earth for construction or repair of houses and for manufacture of country tiles or bricks for housing for personal consumption. CRZ 2011/ICRZ 2011/ESZ GUIDELINES 2011. Use of forest land for Coastal nonforest purposes is permitted only in CRZ-III areas, subject to forest & 3. Deforestation/Felling of trees X X R NA clearance as required under the Forest (Conservation) Act, 1980. The related requirements of other Central and State laws as applicable to the project activities shall be met with CRZ 2011/ICRZ 2011. Construction of beach resorts/hotels with prior Hotels and resorts X X R X approval of MoEFCC in the designated areas of CRZ-III for temporary occupation of tourists/visitors CRZ 2011/ICRZ 2011. In the 200m to 500m zone it shall be permitted Harvesting or drawal of ground water X X ✓ X only when done manually through ordinary wells for drinking, Establishm 4. horticulture, agriculture and fisheries ents Rain water harvesting X X ✓ X ESZ guidelines 2011(actively promoted) CRZ 2011/ICRZ 2011/ ESZ guidelines 2011. Permitted in CRZ-III, live fencing and barbed wire fencing with vegetative cover may be allowed Fencing of premises X R ✓ X around private properties subject to the condition that such fencing shall in no way hamper public access to the beach. 93 Compiled by NCSCM. May require some updates based on CRZ 2019 and other recent legislation/ amendments to existing legislation Environmental and Social Management Framework for ENCORE Program, 2019. Vol I cxix CRZ-III CRZ-IV CRZ-II CRZ-I Broad Sl. No Activity Remarks Category Exploration and extraction of oil and R R R R CRZ 2011/ICRZ 2011. Required clearance from MoEFCC natural gas Protection of hill slopes and river banks X X R NA ESZ guidelines 2011 Sign boards and hoardings X X R X ESZ guidelines 2011 Intensive agriculture practices X X ✓ NA CRZ 2011/ICRZ 2011. Ongoing agriculture and horticulture X X ✓ NA CRZ 2011/ICRZ 2011/ESZ guidelines 2011. practices by local communities 5. Agriculture Organic farming X X ✓ NA CRZ 2011/ICRZ 2011/ESZ guidelines 2011. Salt manufacture ✓ ✓ ✓ NA CRZ 2011/ICRZ 2011. Drastic change of agriculture systems X X R NA ESZ guidelines 2011 ESZ guidelines 2011. For hotels and other business-related Commercial use of firewood X X X NA establishment. Permitted in national park and wildlife sanctuaries to collect firewoods for domestic use CRZ 2011/ICRZ 2011. Groundwater shall not be tapped within 200m of Domestic use of natural water resources X R R NA the HTL; within the 200 meter to 500-metre zone, it can be tapped only including groundwater harvesting with the concurrence of the Central/State Ground Water Board Commercial use of natural water ESZ guidelines 2011. As per approved master plan, which takes care of Manufactur resources including groundwater X X R NA habitats allowing no restriction on movement of wild animals. ing harvesting commercial Manufacture and handling of any 6. X X X X CRZ 2011/ICRZ 2011/ESZ guidelines 2011. items hazardous substances usages & Permitted transfer of hazardous substances from ships to ports, terminals activities and refineries and vice versa in the port areas. Notifications of the Transferring of any hazardous ✓ ✓ ✓ NA Government of India in the Ministry of Environment and Forests No. substances in the port area S.O. 594(E) dated 28th July 1989, S.O. 966(E) dated 27th November, 1989 and GSR 1037(E) dated 5th December, 1989; Use of polythene bags by shopkeepers X X R X ESZ guidelines 2011 Introduction of exotic species X X X X EPA 1986 Biological 7. ESZ guidelines 2011, for commercial purpose and not allowed to activities Introduction of exotic species X X R X introduce in natural course of environment Construction of beach resorts or hotels CRZ 2011, Annex-III/ICRZ 2011/ ESZ guidelines 2011. Construction in designated areas of CRZ-II and III X R R NA should not be undertaken within 200 m in the landward side of HTL and with prior approval of MoEFCC Environmental and Social Management Framework for ENCORE Program, 2019. Vol I cxx CRZ-III CRZ-IV CRZ-II CRZ-I Broad Sl. No Activity Remarks Category within the area between LTL and HTL. Construction should be beyond 8. Tourism & the hazard line or 200 m from HTL (whichever is more). related CRZ 2011/ICRZ 2011. Live fencing and barbed wire fencing with Fencing of hotels and resorts X R R NA constructio vegetative cover allowed around private properties. n activities Flattening of sand dune X X X NA CRZ 2011/ICRZ 2011 Permanent structures for sports facilities X X X NA CRZ 2011/ICRZ 2011 Construction of goal post, net posts and X R R NA CRZ 2011/ICRZ 2011 lamp posts CRZ 2011/ICRZ 2011. No objection certification should be obtained Construction of basement X R R NA from the State Ground Water Authority and the construction should not adversely affect the free flow of groundwater in that area. Establish or operate any tourist establishment or commercial X X X NA ANPATR 1956 (Amendment Regulation, 2012) establishment in the Buffer zone of A&N islands Undertaking activities related to tourism like over-flying the National Park area X X X X ESZ guidelines 2011 by any aircraft, hot-air balloons. Discharge of untreated effluents and CRZ 2011/ICRZ 2011. Untreated effluents and solid wastes were solid waste from industries cities or X X X X prohibited in natural water bodies under Central/State Pollution Control towns in natural water bodies Board and under the Environment (Protection) Act, 1986 CRZ 2011/ICRZ 2011. In any case shall not be permitted based on island Disposal of treated sewage in lagoon X X X X regulation and CRZ-IV under the Water (Prevention and Control of Pollution) Act, 1974; and except for storm water drains Disposals/ Disposal of treated sewage in sea (of sea CRZ 2011/ICRZ 2011. Approval under the Water (Prevention and X X X R 9. Discharges/ side) Control of Pollution) Act, 1974 (6 of 1974) Pollutants CRZ 2011/ICRZ 2011. Necessary arrangements for the treatment of the effluents and solid wastes must be made. It must be ensured that the Industrial and domestic Sewage X X R X untreated effluents and solid wastes are not discharged into the water or discharge on the beach; and no effluent/solid waste shall be discharged on the beach Dumping of ash or any wastes from X X X X CRZ 2011/ICRZ 2011. Shall not be permitted in any case in CRZ areas thermal power stations Environmental and Social Management Framework for ENCORE Program, 2019. Vol I cxxi CRZ-III CRZ-IV CRZ-II CRZ-I Broad Sl. No Activity Remarks Category CRZ 2011/ICRZ 2011, concerned authority shall implement Dumping of city or town waste for the schemes for phasing out any existing practice, if any, shall be phased out X X X X purposes of landfilling within a period of one year from date of commencement of this notification Discharge effluents and solid waste in X X X X ESZ guidelines 2011 natural water bodies or terrestrial area No untreated sewage, effluents Ballast water, ship washes, fly ash or solid waste from all activities including from X X X R CRZ 2011/ICRZ 2011 aquaculture operations shall be let off or dumped Air and vehicular pollution NA NA R NA ESZ guidelines 2011 Use of renewable energy sources X X ✓ R CRZ 2011/ICRZ 2011/ESZ guidelines 2011. Dressing or altering of sand dunes hills, natural features including landscape CRZ 2011/ICRZ 2011. No flattening of sand dunes shall be carried out Green X X X NA 10 changes for beautification, recreational under CRZ-III technology and other such purpose Adoption of green technology for all X X ✓ X ESZ guidelines 2011, In the buffer zone of ESA activities Setting up of hatchery and natural X X ✓ NA CRZ 2011/ICRZ 2011. Only in permitted areas drying area for fishes Plants and animals collected for ✓ ✓ ✓ ✓ WLPA, 1972. scientific study Collection of shcedueled animals for ✓ ✓ ✓ ✓ WLPA, 1972. breeding in captive breeding 11. Fishing/Aq Traditional fishing and allied activities X X X ✓ CRZ 2011/ICRZ 2011. uaculture undertaken by local communities Beaching of fishing craft or any other CRZ 2011/ICRZ 2011. No developmental activities shall be permitted in X R R NA craft in turtle nesting areas the turtle breeding areas referred to in subparagraph (vii) in CRZ-2011 Creating facilities required for local CRZ 2011/ICRZ 2011, In view of the unique coastal systems of fishing communities such as fish drying X X ✓ NA backwater and backwater islands along with space limitation present in yards, auction halls, net mending yards, the coastal stretches of the State of Kerala and Goa Environmental and Social Management Framework for ENCORE Program, 2019. Vol I cxxii CRZ-III CRZ-IV CRZ-II CRZ-I Broad Sl. No Activity Remarks Category traditional boat building yards, ice plant, ice crushing units, fish curing facilities CRZ 2011/ICRZ 2011, comprehensive plan prepared by the State Construction/reconstruction of dwelling Government or the Union territory in consultation with the traditional units of traditional coastal communities coastal communities including fisherfolk and incorporating the necessary including fisherfolk may be permitted X X ✓ NA disaster management provision, sanitation and recommended by the between 100 and 200 metres from the concerned State or the Union territory CZMA to NCZMA for approval HTL along the seafront by MoEFCC Shipping (other than a designated X NA NA R CRZ 2011/ICRZ 2011. shipping area) Install an authorized navigational aid ✓ ✓ ✓ ✓ CRZ 2011/ICRZ 2011. Permitted in all CRZ areas. 12. Navigation Coral removal for Construction CRZ 2011/ICRZ 2011. Coral removal for any purpose shall not be /Widening of Navigation channels in X X X X permitted in any CRZ areas coral area Desalination plants ✓ ✓ ✓ NA CRZ 2011/ICRZ 2011 CRZ 2011/ICRZ 2011. Permissible under the notification or for control of coastal erosion and maintenance or clearing of waterways, channels Port development and shipping ✓ ✓ ✓ R and ports or for prevention of sandbars or for tidal regulators, stormwater drains or for structures for prevention of salinity ingress and sweet water recharge Residential buildings, office buildings, Infrastructu hospital complexes, workshops of X X R NA CRZ 2011/ICRZ 2011. Subject to clearance from MoEFCC re & coastal strategic and defense projects in terms 13. developme of ESIA notification, 2006 nt Construction of Jetties, quays, wharves, erosion control measures, boat repair, slipways, breakwaters, pipelines, ✓ ✓ ✓ NA CRZ 2011/ICRZ 2011. lighthouses, navigational safety facilities, coastal police stations require waterfront Measures to prevent sand bars, installation of tidal regulators, laying of ✓ ✓ ✓ NA CRZ 2011/ICRZ 2011. stormwater drains or for structures for Environmental and Social Management Framework for ENCORE Program, 2019. Vol I cxxiii CRZ-III CRZ-IV CRZ-II CRZ-I Broad Sl. No Activity Remarks Category prevention of salinity ingress and freshwater recharge based on studies Dredging and underwater blasting in X X X X CRZ 2011/ICRZ 2011. and around coral formations Construction of dwelling units, public utilities, schools and dispensaries, drainage, public toilets, sewerage, CRZ 2011/ICRZ 2011. Obtain approval from concerned Coastal Zone bridges, roads, public rain shelters, ✓ R ✓ NA Management Authority water supply, drainage, sewerage which are required for traditional inhabitants living within the biosphere reserves Construction of units or auxiliary CRZ 2011/ICRZ 2011, Prior approval of the concerned Pollution Control thereto for domestic sewage, treatment X X R NA Board or Committee and disposal ESZ guidelines 2011. This should be done with proper ESIA and Widening of roads X R R NA mitigation measures. Movement of vehicular traffic at night NA NA R NA ESZ guidelines 2011 Storage of non-hazardous cargo such as edible oil, fertilizers, food items in the ✓ ✓ ✓ NA CRZ 2011/ICRZ 2011. NDZ area near the port Storage of petroleum products and liquefied natural gas and regasification X ✓ ✓ NA CRZ 2011/ICRZ 2011. and other processes with raw petroleum Construction/expansion of air strips and CRZ 2011/ICRZ 2011. Expect for defence requirements are most R R R NA helipads essential under permissible activities in the CRZ. CRZ 2011/ICRZ 2011. Carrying treated effluents and waste water Construction activity between LTL and discharges into the sea, facilities for carrying sea water for cooling ✓ NA NA NA HTL purposes, oil, gas and similar pipelines and facilities essential for activities permitted under this CRZ notification Land reclamation, bunding or disturbing the natural course of sea water with X X X NA CRZ 2011/ICRZ 2011. similar obstuctions Environmental and Social Management Framework for ENCORE Program, 2019. Vol I cxxiv CRZ-III CRZ-IV CRZ-II CRZ-I Broad Sl. No Activity Remarks Category Construction or modernisation or expansion of foreshore facilities like ports, harbours, jetties, wharves, quays, slipways, bridges, ✓ ✓ ✓ NA CRZ 2011/ICRZ 2011. Subject to clearance from MoEFCC sealink, road on stilts, and such as meant for defence and security purpose Control of erosion, based on scientific ✓ ✓ ✓ NA CRZ 2011/ICRZ 2011. study including ESIA studies Reclamation for commercial purposes such as shopping and housing X X X NA CRZ 2011/ICRZ 2011 complexes, hotels and entertainment activities Thermal power plants (only foreshore facilities for transport of raw materials facilities for intake of cooling water and ✓ X ✓ NA CRZ 2011/ICRZ 2011. Permitted those required water front outfall for discharge of treated waste cooling water) CRZ 2011/ICRZ 2011. Except those activities which are to be regulated All other activities with investment by the concerned authorities at the State/Union Territory level in X X R X exceeding rupees five crores accordance with the provisions of paragraph 6, subparagraph (2) of Annexure 1 of the notification Oils gas and similar pipelines, conveying systems including ✓ ✓ ✓ NA CRZ 2011/ICRZ 2011. transmission lines and facilities Construction activity between the LTL and HTL carrying treated effluents and ✓ ✓ ✓ NA CRZ 2011/ICRZ 2011. waste water discharges into the sea facilities Development of vacant plots between 200 and 500 metres of High Tide Line CRZ 2011/ICRZ 2011. Prior approval of Ministry of Environment and X X ✓ NA for temporary occupation for hotels and Forests (MEF) resorts Environmental and Social Management Framework for ENCORE Program, 2019. Vol I cxxv CRZ-III CRZ-IV CRZ-II CRZ-I Broad Sl. No Activity Remarks Category New constructions within 200 meters CRZ 2011/ICRZ 2011. No new construction of buildings shall be from the HTL, except those mentioned NA X R NA permitted within 200 metres of the HTL as per CRZ-II in NDZ New construction of building only on CRZ 2011/ICRZ 2011. subject to the existing local town and country the landward side of the existing road, NA R X NA planning regulations including the ‘existing’ norms of Floor Space Index or on the landward side of existing or Floor Area Ratio authorized structures Construction /alterations of an exixting buildings on the landward side of the NA ✓ NA NA CRZ 2011/ICRZ 2011. existing road, or on the landward side of existing authorized structures Atomic energy and related activities ✓ ✓ ✓ NA CRZ 2011/ICRZ 2011. Permitted in CRZ-I Establishment of major hydroelectric X X R NA ESZ guidelines 2011 projects Erection of electrical cables X X R NA ESZ guidelines 2011. Promote underground cabling Facilities generating power by using X ✓ ✓ NA CRZ 2011/ICRZ 2011 non-conventional energy Any type of construction including observation towers etc including for Monitoring X X ✓ NA CRZ 2011/ICRZ 2011. defence purposes and developmental and activities 14. Meterologi Installation of Buoys to collect data on cal met and environmental parameters and ✓ X X ✓ CRZ 2011/ICRZ 2011. activities marker buoys Installation of weather radars X X ✓ NA CRZ 2011/ICRZ 2011. Setting up of industries/Power X X X NA CRZ 2011/ICRZ 2011/ESZ guidelines 2011. plants/windmills/sawmills Setting up of small scale food/fish CRZ 2011/ICRZ 2011. Except treatment plants of waste and effluents 15. Industries processing industries with waste X X R NA arising from hotels, beach resorts and human settlements located in CRZ treatment methods/plants areas other than CRZ-I and disposal of treated wastes and effluents Setting up of industries causing X X X NA ESZ guidelines 2011 pollution (water, air, soil, noise, etc.) Environmental and Social Management Framework for ENCORE Program, 2019. Vol I cxxvi CRZ-III CRZ-IV CRZ-II CRZ-I Broad Sl. No Activity Remarks Category Reconstruction/renovation of existing CRZ 2011/ICRZ 2011. Permitted subject to the existing FSI/FAR norms X ✓ ✓ NA Religious religious monuments and without change in the existing use. 16. values Renovation of natural CRZ 2011/ICRZ 2011. Public use which means buildings such as for the X R X NA beauty/historically/heritage sites purposes of worship, education, medical care and cultural activities CRZ 2011. Developmental activities in the CRZ area of the Greater Mumbai because of the environmental issues, relating to degradation of CRZ areas falling within municipal mangroves, pollution of creeks and coastal waters, due to discharge of R R R NA limits of the Greater Mumbai untreated effluents and disposal of solid waste, the need to provide decent housing to the poor section of society and lack of suitable alternatives in the inter connected islands of Greater Mumbai shall be regulated CRZ 2011. Accordance with the norms laid down in the Town and Country Planning Regulations as they existed on the date of issue of the Development or redevelopment X R R NA notification dated the 19th February, 1991, unless specified otherwise in CRZ-2011 notification. CRZ 2011. State Government may implement slum redevelopment Areas Slum rehabitation schemes X R R NA schemes as identified as on the date of issue of CRZ-2011 notification requiring directly or through its parastatal agencies 17. special CRZ 2011. Due to their age these structures are considerati extremely vulnerable and disaster prone and therefore there is an urgent Redevelopment of dilapidated, cessed on X R R NA need for the redevelopment or reconstruction of these identified and unsafe buildings buildings. These projects shall be taken up subject to the following conditions mentioned in CRZ-2011 notification and safeguards CRZ 2011. Ecological sensitive areas mentioned in CRZ-2011 notification under norms for regulation of activities permissible in areas Critical Vulnerable Coastal Areas X R R NA requiring special consideration in para. 4, which shall be managed with (CVCA) the involvement of the local coastal communities including the fisher folk. Source: NCSCM Environmental and Social Management Framework for ENCORE Program, 2019. Vol I cxxvii