HA TINH PROVINCIAL PEOPLE’S COMMITTEE WORLD BANK RESETTLEMENT ACTION PLAN (Final) DYNAMIC CITIES INTEGRATED DEVELOPMENT PROJECT KY ANH TOWN SUBPROJECT – HA TINH PROVINCE Ha Tinh, 6/2019 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province TABLE OF CONTENT PART 1: PROJECT DESCRIPTION .......................................................................................11 1.1. General information ..........................................................................................................11 1.2. Ky Anh town subproject ....................................................................................................11 1.2.1. Component 1: Construction of technical infrastructure and urban roads .................11 1.2.2. Component 2: Technical assistance and implementation support .............................12 PART 2: SCOPE OF LAND ACQUISITION AND RESETTLEMENT ..............................13 2.1. Number of Affected households ........................................................................................13 2.2. Impact on land....................................................................................................................14 2.3. Affected house/structure and other assets ..........................................................................15 2.4. Impact on crops and vegetation .........................................................................................15 2.5. Impact on public assets ......................................................................................................15 2.6. Impact on Physical and Cultural Resources .......................................................................16 2.7 Temporary impact ...............................................................................................................16 2.8 Indirect impact ....................................................................................................................16 2.9. Impact mitigation measures ...............................................................................................16 PART 3: OBJECTIVES OF THE RESETTLEMENT PLAN ...............................................17 PART 4: SOCIO-ECONOMIC PROFILE OF AFFECTED HOUSHEOLDS ....................19 4.1. Socio-economic survey’s objectives and surveying method .............................................19 4.1.1 Ojectives .......................................................................................................................19 4.1.2 Survey methods ............................................................................................................19 4.2.1. Natural conditions ......................................................................................................20 4.2.1. Socio-economic status of Ky Anh town ......................................................................20 4.3. Socio-economic status of affected households ..................................................................23 4.3.1. Demorgraphic characteristic ......................................................................................24 4.3.2. Education ....................................................................................................................24 4.3.3. Occupation and Employment ......................................................................................25 4.3.4. Household income and expenditure ............................................................................25 4.3.5. Sanitation, public health and medical service ............................................................26 4.3.6. Affected household’s asset ownership ........................................................................26 4.3.7. Debt and utilization of credit ......................................................................................26 4.3.8. Participation in local social network ..........................................................................27 4.4. Land use of affected households ........................................................................................27 4.5. Gender issues .....................................................................................................................27 4.6. Other social impacts ...........................................................................................................29 Page 2 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province PART 5: RESETTLEMENT POLICY FRAMEWORK ........................................................30 5.1. World Bank’s Involuntary resettlement policty (OP4.12) .................................................30 5.2. Legal framework on compensation, site clearance and resettlement of Viet Nam ............31 5.3. Key gaps between the World Bank’s Involuntary Resettlement policy and the GoV’s laws and regulations. .........................................................................................................................31 5.4. Cup off date........................................................................................................................34 PART 6: PROJECT POLICIES ON COMPENSATION, ASSISTANCE AND RESETTLEMENT .....................................................................................................................34 6.1. Eligibility ...........................................................................................................................34 6.2. Resettlement principles of the project ................................................................................35 6.3.1. Compensation policy for agricultural land.................................................................36 6.3.2. Compensation for residential land .............................................................................37 6.3.4. Compensation for crop, trees and livestock ................................................................38 6.3.5. Compensation for affected public assets.....................................................................39 6.3.6. Compensation for temporary impacts during construction phase ..............................39 6.3.7. Compensation for transportation of assets .................................................................39 6.3.8. Assistance for income restoration and life subsistence ..............................................39 PART 7. INCOME RESTORATION PROGRAM .................................................................49 7.1. Objective ............................................................................................................................49 7.2. Program’s subjects .............................................................................................................49 7.3. Income restoration program’s activities.............................................................................49 7.4. Executive agency ...............................................................................................................50 7.5. Budget for program implementation ..................................................................................51 7.6. Implementation plan ..........................................................................................................51 7.7. Monitoring and evaluation .................................................................................................52 PART 8: RESETTLEMENT ARRANGEMENT ....................................................................52 8.1. Resettlement options ..........................................................................................................52 8.2. Construction of resettlement area ......................................................................................52 8.2.1. Evaluation on the project’s resettlement demand .......................................................53 8.2.2. Public consultation on resettlement area ...................................................................53 8.2.3. Granting of land use right certificate .........................................................................53 PART 9: COMMUNITY PARTICIPATION AND PUBLIC CONSULTATION ...............54 9.1. Objectives of information dissermination and public consultation ...................................54 9.2. Participation and consultation procedure ...........................................................................54 9.2.1. Public consultation during project preparation .........................................................54 9.2.2. Public consultation during project implementation stage ..........................................57 9.2.3. Public dissemination ...................................................................................................58 Page 3 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province PART 10: GRIEVANCE REDRESS ........................................................................................58 10.1. Grievance redress responsibility ......................................................................................58 10.2. Grievance redress mechanism ..........................................................................................58 PART 11: INSTITUTIONAL RESPONSIBILITY .................................................................59 PART 12: IMPLEMENTATION PLAN ..................................................................................62 PART 13: BUDGET ESTIMATION ........................................................................................65 13.1. Replacement cost survey..................................................................................................65 13.3. Budget estimation ............................................................................................................66 PART 14: MONITORING AND EVALUATION ...................................................................68 14.1. Monitoring’s objective .....................................................................................................68 14.2. Internal monitoring ..........................................................................................................68 14.3. External monitoring .........................................................................................................69 ANNEXES ...................................................................................................................................72 Annex 1: Minutes of public consultation meetings ..................................................................72 Annex 2: List of affected households ......................................................................................87 Annex 3: Proposed term of reference for independent monitoring consultant .........................97 Page 4 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province LIST OF TABLES Table 1: Investments in Component 1 ..........................................................................................12 Table 2: Summary and classification of affected households ......................................................14 Table 3: Scope of impact on land ................................................................................................14 Table 4: Impact on structure of each work item ...........................................................................15 Table 5: Impact on crops/vegetation and trees .............................................................................15 Table 6: Qualitative method..........................................................................................................20 Table 7: Economic growth rate and comparison of Ky Anh town’s GDP and Ha Tinh province’s average GDP per capita ................................................................................................................20 Table 8: Percentage of economic sectors by years ......................................................................21 Table 9: Population distribution in project ward/commune .........................................................21 Table 10: Percentage of poor and near poor households in Ky Anh town in 2016 ......................23 Table 11: Educational background of household head and member ............................................24 Table 12: Employment of HH’s head and member ......................................................................25 Table 13: Key gaps between GoV’s policies and the World Bank’s policies on compensation, assistance and resettlement and policies applied for this project ..................................................32 Table 14: Entitlement Matrix ........................................................................................................41 Table 15: Training courses (Currency: VNĐ) ..............................................................................49 Table 16: Budget for program implementation ............................................................................51 Table 17: Tentative schedule for implementation of the income restoration program .................52 Table 18: Analyzing options for resettlement areas .....................................................................53 Table 19: Public consultation meetings on resettlement............... Error! Bookmark not defined. Table 20: Implementation schedule ..............................................................................................64 Table 21: Results of replacement cost survey for land .................................................................65 Table 22: Replacement cost for house and structure ....................................................................66 Tabble 23: Replacement cost for crop and vegetation ..................................................................66 Table 24: Tentative budget for the RAP implementation .............................................................67 LIST OF FIGURES Figure 1: Master plan of the investments .....................................................................................12 Figure 2: Labor structure in economic sectors in 2016.................................................................22 Figure 3: Educational background of labor ..................................................................................22 Figure 4: Structure of organization implementing RAP ...............................................................63 Page 5 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province ABBREVIATIONS AP Affected people AH Affected households Compensation and Site Clearance CSCC Committee Compensation, Assistance and CARC Resettlement Committee Department of Agriculture and Rurcal DARD development EM Ethnic Minority HS High school IDA Independent Development Agency IMA Independent Monitoring Agency IOL Inventory of Losses LFDC Land fund development center LURC Land Use right Certificate Ministry/Department of Labor, Invalids M/DoLISA and Social Affairs Minstry of Natural Resources and MONRE Environment NGO Non-Governmental organization PC People’s committee PMU Project Management Unit RAP Resettlement action plan SS Secondary school SO Socio-economic USD US dollar VND Viet Nam dongs WB World Bank Page 6 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province DEFINITION OF TERMS Project Affected Persons (PAP): Individuals, households, organizations are those who are physically relocated (relocation, loss of residential land, or loss of shelter) and/or economically displaced (loss of land, assets, access to assets, income sources, or means of livelihood) as a result of (i) involuntary expropriation of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas. In the case of affected household, it includes all members residing under one roof and operating as a single economic unit, who are adversely affected by a project or any of its components. Census: Census of all affected people will include key socioeconomic information of the project affected persons (PAPs), such as main occupations, sources of income, and levels of income in order to be able to determine vulnerable households as well as to establish baseline data for monitoring livelihood restoration of the PAPs. Inventory of losses (IOL): a process where all fixed assets (i.e. lands used for residence, commerce, agriculture, including ponds; dwelling units; stalls and shops; secondary structures, such as fences, tombs, wells; trees with commercial value; etc.) and sources of income and livelihood inside the Project right-of-way are identified, measured, their owners identified, their exact location pinpointed, and their replacement costs calculated. Additionally, the severity of impact to the affected assets and the severity of impact to the livelihood and productive capacity of displaced households will be determined. Cut-off-date: The date of land acquisition announcement to affected households made by district PC. . Project affected households and local communities will be informed of the cut-off date for the project, and that anyone moving into and/or asset created in the Project Area after the cut-off date will not be entitled to compensation and assistance under the Project. Eligibility: The criteria to be used for the project to determine PAPs who shall be entitled to compensation and support under the resettlement program. Compensation (in cash or in kind): for loss of assets including land and non-land assets and loss of income sources. Compensation for loss of assets will be at replacement costs. Rehabilitation measures to restore and improve incomes will be determined in consultation with the PAPs. Host community: Community residing in or near the area to which affected people are to be relocated. Replacement Cost: the amount which is needed to replace an affected asset without depreciation or deductions for salvageable materials, inclusive of taxes, and/or costs of transactions. It is calculated before displacement as follows: a. Productive land (agricultural, fishponds, gardens, forests) based on market prices that reflect recent land sales of comparable land in the district and other nearby areas or, in the absence of such recent sales, based on the land’s productive value; b. Residential land based on market prices that reflect recent transactions of comparable residential land in the district and other nearby areas or, in the absence of such recent land transactions, based on transactions in other locations with similar qualities; c. Houses and other related structures based on current market prices of materials and labor without depreciation or deductions for salvaged building materials plus fees for obtaining the ownership papers; Page 7 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province d. Trees and domestic animals based on the current market value of the trees/animals at the time of land acquisition; Replacement Cost Survey: the process involved in determining the replacement cost of land, and non-land assets affected based on market surveys. Resettlement. This RAP, in accordance with the World Bank’s Operational Policy on Involuntary Resettlement (OP 4.12), covers the involuntary taking of land that results in (i) relocation or loss of shelter, (ii) loss of assets or access to assets; or (iii) loss of income sources or means of livelihood, whether or not the affected persons must move to another location. Resettlement Assistance: Additional support provided to the PAPs who are losing assets (particularly productive assets), incomes, employment or sources of living, to supplement the compensation payment for acquired assets to achieve, at a minimum, the full restoration of living standards and quality of life same as their pre-project condition. Livelihood: A set of economic activities, involving self-employment, and or waged employment by using one’s endowments (both human and material) to generate adequate resources for meeting the requirements of the self and household on a sustainable basis. Livelihood restoration: refers to a set of measures/activities provided to the affected people who lost income sources and/or means of livelihoods and with their efforts to restore their income and living standard, as equal to or better than pre-project level. Severely affected households. Household who lose 20% (10% for the vulnerable) or more of their productive land holding is considered as severely affected as a result of the project. Vulnerable Groups and Individuals at risk: a person or a group of people who might, due to project land acquisition and resettlement, suffer disproportionately from adverse impacts of the project and/or be less able to access the project benefits and asset compensation, including livelihood restoration, when compared to the rest of the PAPs. Vulnerable people include: (i) single female headed households with dependents and economic disadvantage (single, widow, disabled husband); (ii) people with physical or mental disability (loss of working ability); (iii) the poor under MOLISA standard; (iv) the elderly alone; (v) ethnic minority people; and (vi) social policy families (as defined by each province). List of the vulnerable will be determined throughout census, SES and public consultation during project preparation. Page 8 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province EXECUTIVE SUMMARY Introduction This Resettlement Action Plan (RAP) is prepared for– Ky Anh town subproject in Ha Tinh province under the Dynamic Cities Integrated Development Project which uses credit fund from the World Bank. The subproject has 2 components: (i) Component 1: Structural Investments - Rehabilitation and Construction of Resilient Urban Infrastructure; (ii) Component 2: Non-structural Investments - Technical assistance and implementation support.; In these 2 components, component 1 requires land acquisition and site clearance. This plan includes results of the preliminary inventory of loss, socio-economic survey, entitlement of the affected people and assessment on project positive and negative effects. The plan also refers to resettlement options, livelihood restoration program, plan and cost for implementation of the RAP. A Grievance Resdress mechanism is established in the RAP to ensure that all concerns and complaints of PAPs will be received and resolved in timely and satisfactory manner. Scope of land acquisition and site clearance Following the preliminary design, proposed items of the component 1 include:: (a) Construction of the main road connecting urban centers; (b) Construction of wastewater collection and treatment system; (c) Construction of embankment and road on two banks of Tri river. These work items require projected land acquisition of 170,788 m2 of which residential land is 19,416 m2; agricultural land is 128,595m2, and land under public management is 22,770 m2. About 344 households will be affected by the subproject, of which 91 households will be affected severly, including 77 households losing productive land and 14 households being relocated. Besides, the subproject also affects business of 11 HHs and crops and trees of local people. Mitigation measures During the preparation for the project, Consultant worked with relevant authorities and affected households in meetings, surveys and public consultation to find out measures to mitigate negative impacts from the project, increase investment efficiency and minimize land acquisition. Selection of resettlement options has been discussed with affected households to minimize impacts and to recover the affected economy. Policy framework Land acquisition, compensation, support and resettlement for the subproject will be implemented in compliance with the World Bank’s Operation Policy (OP.4.12) on involuntary resettlement and the laws and regulations of the GOV on compensation, support and resettlement when the State recovers land for public purposes. This RAP is developed based on OP.4.12, the laws and regulations of the GOV and integrated regulations of Ha Tinh PPC on compensation, support and resettlement applied for the province. The main objective of this RAP is to establish a set of criteria for compensate, support and resettlement for affected households based on the principles of full replacement cost. Beside of compensation, affected households will be provided with various types of assistance for livelihood restoration and life stabilization. Income restoration program Page 9 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province The project’s policy aims to provide people with life stabilization and to restore income and livelihood of affected people at least equal or higher than pre-project level. The income restoration program will be implemented for 91 severely affected households, with proposed activities including (i) vocational training; (ii) Loan support and iii) Job creation. Institutional arrangement Ky Anh town PMU and the town people’s council are in charge of implementing the compensation, support and resettlement and be responsible for managing and monitoring the implementation of the Resettlement Action Plan. During the project implementation, there will be close connection among staff of relevant agencies including staff of the Compensation and Resettlement Commission, PMU staff, ward/commune PC staff and local people in the project area and resettlement specialists. Implementation plan Resettlement Action plan is implemented in connection with the construction work of the project. Affected households will get full compensation and allowance before site clearance which is expected to start in Quarter II/2020 . Public consultation and participation Local government, people and affected households will be consulted via public meetings. Socio-economic survey and inventory of loss was done for affected households. Obtained results during the public consultation have been presented in the resettlement action plan and will be updated for the implementation process. Consulation will be continued during the project implementation. Monitoring and evaluation The Project Management Unit (PMU) is responsible for conducting internal monitoring the implementation of the RAP. In addition, the PMU will hire an external monitoring agency (EMA) to undertake independent monitoring of the process of RAP implementation and to assess living standard of the affected people during and after the completion of the resettlement. Grievance redress mechanism To ensure all complaints from affected people regarding land acquisition, compensation and resettlement are resolved timely and satisfactorilly, a grievance redress mechanism was established in this Resettlement Action Plan. All affected people can make their complaints and querries in oral or writing on their entitlements, compensation price, support, income restoration... to the implementing agencies without paying any cost relating the resolution of their complaints at all levels. The complaints will go through 3 levels to be resolved before chosing the court as final resolution. The PMU will appoint one staff being in charge of monitoring and following up complaints and grievance of APs until resolved. Resettlement cost estimate Total estimated cost for implementation of this RAP is about 83,470,000,000 VND ($3,709,778) and provided by Ha Tinh PPC from counterpart fund. This includes cost for compensation of land, non-land assets and crops/trees as well as cost for income restoration program, monitoring and evaluation. Resettlement cost will be updated at the time of compensation Page 10 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province PART 1: PROJECT DESCRIPTION 1.1. General information 1. Proposal of the Dynamic Cities Integrated Development Project (DCIDP) was approved by the Prime Minister in the document No. 2318/VPCP-QHQT dated March 14th, 2017 of the Government Office. The project uses IDA fund of the World Bank Group and counterpart funds from local /central budget. The proposed project development objective is to increase access to urban infrastructure and improve integrated urban planning in the project cities; 2. The Project is implemented in four cities/towns, including (1) Hai Duong city (Hai Duong province); (2) Ky Anh town (Ha Tinh Province); (3) Tinh Gia town (Thanh Hoa Province), and (4) Yen Bai city (Yen Bai Province). 3. To achieve the above objectives, the project consists of 2 components: Component 1: Structural Investments - Rehabilitation and Construction of Resilient Urban Infrastructure; Component 2: Non-structural solutions - Technical assistance and implementation support. 4. The duration of “the Dynamic Cities Integrated Development Project” is expected to be 5 years, starting in 2019 and completed in 2025. 1.2. Ky Anh town subproject 5. Ky Anh is one of the two towns in Ha Tinh province. The town has natural area of. 2,822.167km2, population of 71,399 by 2015 and percentage of poor household as multi- dimensional poverty in 2016 as 17.25%. Ky Anh has favourable location on North-South traffic axis, East-West Economic Corridor, 50km from Ha Tinh province to the south. Ky Anh town is the economic hub where most of the major projects in Ha Tinh province concentrate, particularly Vung Ang Economic Zone. According to the 2035 Master Plan, Ky Anh will be integrated city of industry, trading, service, transportation hub and tourism center, taking the role of a focal city promoting development of South Ha Tinh – North Quang Binh region. However, Ky Anh town has still not mobilized its full potentiality for urban development, leading to many shortcomings in lacking of urban landscape, lack of land bank for housing, for commercial and trade development…The implementation of Ky Anh town subproject, Ha Tinh province under the “Dynamic Cities Integrated Development Project will help the town to address its weaknesses in urban infrastructure system and intitially orient the town toward right development as planned. The subproject includes 2 components as follow: 1.2.1. Component 1: Construction of technical infrastructure and urban roads 6. The subproject will help Ky Anh town to form the most basic framework of urban infrastructure to meet the current urgent needs and development in the near future. This component includes construction of road, wastewater collection and treatment system, construction of Tri river embankment, rehabilition of lake. The proprosed works of the Component 1 are presented in table 1 as follows: Page 11 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Table 1: Investments in Component 1 No Work item Scope Main specification Location Start point (Km0+00): Connecting with the road to Formosa Industrial zone End point (Km3+737,89): Connecting with Nguyen Thi Bich Chau road Road scope: Construction of Section 1: From Km0+00 to Km0+450, L = 0.45km. cross main road 1 3.74 km section: 7.5x2+2x0.5=16m; connecting urban centers Section 2: From Km3+050 to Km3+737,89, L= 3,29km. cross section 4+7.5x2+0.5x2=20m With full infrastructure facilities including drainage, lighting system, trees, protection works, bridge on the route, cross culvert,... Location: 3 wards/communes: Ky Trinh, Ky Hung and Ky Chau (Ky Anh) Investments include: Construction of Wastewater collection sewer: 38.5km, HDPE D315 ÷ D450 ; wastewater Wastewater pumping station: 11 station, area 7m2/station 2 collection and 2,000m3/day treatment Wastewater treatment station: 2,000m3/day system Location: In 4 wards/communes: Tri river, Ky Trinh, Ky Hoa, Ky Hung Scope: Construction embankments on 2 banks of the river, L= 1.5km at Construction of each side (from the overflow to the overpass of NH1A cross ing embankment Tri river) 3 3 km and road along Roads on 2 banks of the river, cross section: Tri river banks 6+5.5+1.5 = 13m, with trees, sidewalk, water drainage and lighting system Location: in 2 wards/communes: Song Tri and Ky Hoa Investments include: Dredging and embanking the lake Rehabilitation Construction of water conductor for the lake 4 of Thuy Son 1.9ha lake Full infrastructure including water drainage, lighting system, trees Location: Song Tri ward 1.2.2. Component 2: Technical assistance and implementation support 7. The main objectives of this component are to (i) support the preparation of general development strategy of Ky Anh town; (ii) support preparation of development strategy for public transport; (iii) support preparation of plan for management of natural disaster and climate change. Figure 1: Master plan of the investments Page 12 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province PART 2: SCOPE OF LAND ACQUISITION AND RESETTLEMENT 8. Among two components, components 1 will cause land acquisition of loacal people leading to loss of land and non-land assets and relocation. The impacts of the component on households are identified through an initial IOL as follows. Detailed of impacts will be identified and updated in the RAP after approval of detailed design and completion of detailed measurement survey (DMS). 2.1. Number of Affected households 9. The inventory of loss (IOL) was carried out from June to July 2017 by Internatinal engineering consultant joint stock company (INTEC) . Result of the IOL shows a total of 344 households to be affected by the project, of which 91 households (HH) are severely affected due to losing more than 20% of productive land (77HHs) and relocation (14 HHs). Number of affected businesses is 11 HHs with 5 HHs having to relocate. There are 16 vulnerable HHs (12 poor HHs and 2 social policy HHs anh 2 female –headed household with dependents). There are no ethnic minority households to be affected. Affected households are presented in following table. Page 13 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Table 2: Summary and classification of affected households N Item Total Affected Affecte Vulnerable Severely affected HHs o affected structure d HHs HHs busines Relocate Affected Total ses d HHs >20% agricultu ral land (10% for vulnerabl e HHs) The main road 1 connecting 208 30 7 14 14 43 57 urban centers Wastewater collection and 2 81 5 0 0 0 23 23 treatment system Embankment 3 and road on Tri 55 2 4 2 0 11 11 river banks 4 Dredging lake 0 0 0 0 0 0 0 Total 344 37 11 16 14 77 91 Source: IOL 2.2. Impact on land 10. Total affected land area is estimated about 170,780 m2, most of which are agricultural land (79.7%); residential land accounts for 14.0%, mainly due to the road work item. Land under public management accounts for 6.2%. Land being affected is presented in Table 3. Table 3: Scope of impact on land Agricultural land (m2) No Land under Total Residentia Item Perenial Pond/we town PC l land (m2) Annual (m2) crop crop t land management The main road 1 connecting urban 13,578 45,377 583.60 12,434 71,972.60 centers Wastewater collection 2 0 45,725 0 0 522 46,247 and treatment system Embankment and road 3 5,837 26,248 10,169 492 9,814 52,560 on Tri river bank Total 19,416 117,350 10,169 1,076 22,770 170,780 Source: IOL Page 14 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province 2.3. Affected house/structure and other assets 11. This subproject will affect 2,140m2 of house and structure of 37 households and other properties like kitchen: 440m2; breeding facilities: 300m2; separate toilets: 240m2; Fence: 2,150m2; yard: 2,340m2; 35 gates; 12 water tanks; 10 wells. Among 37 HHs affected houses and structures, 14 HHs are affected entire houses and have to relocate. Table 4: Impact on structure of each work item Work item House Kitch Breed Toilet Yard Fence Gate Water Well (m2) en ing (m2) (m2) (m2) (piece tank (piece No (m2) facilit ) (piece ) y ) (m2) The main road 1,800 320 120 130 1890 1,280 30 10 7 1 connecting urban centers Wastewater 0 0 180 0 0 0 0 0 0 2 collection and treatment system Embankment and 340 120 0 110 450 870 5 2 3 3 road on Tri river bank 2,1400 440 300 240 2,340 2,150 35 12 10 Total Source: IOL 2.4. Impact on crops and vegetation 12. The project will affect crops and vegetation including (i) fruit trees: 800 trees; (ii) timber trees: 1,500trees; (iii) short-term crop: 57,648 m2 of rice and 59,703m2 of other crops and (iv) tea tree. Main impacts are summaried in Table 5. Table 5: Impact on crops/vegetation and trees Work item Rice Crop Tea tree Fruit tree Timber tree No (m2) (m2) (m2) (tree) (tree) The main road 1 connecting urban 40,402 16,803 163 500 1,000 centers Wastewater collection 2 16,761 28,964 0 0 0 and treatment system Embankment and 3 13,866 12,383 10,169 300 500 road on Tri river bank Total 57,648 59,703 10,332 800 1,500 Source: IOL 2.5. Impact on public assets 13. The project will also affect public works of electric pole, power substations, power wire line, including: 2 substations, 30 electric poles, 1,200m power wire. Page 15 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province 2.6. Impact on Physical and Cultural Resources 14. During the survey for resettlement, the item of main road connecting urban centers affects Nguyen Ca family ancestral temple. This is a two-storey building with area of 80m2 for worshiping 4 generations of Nguyen Ca family. After consultation, head of the family and representatives fully understood the project’s meaning and they totally supported to displace the temple for the project implementation. 2.7 Temporary impact 15. During the construction and installation of wastewater drainage pipeline, the project will affect temporarily 38,766m asphalt road and concrete road in the residential areas of Song Tri, Ky Trinh wards and 3 communes of Ky Hoa, Ky Huong and Ky Chau. The project also affect temporarily people’s movement and transportation and people’s access to shops and works on the route. 2.8 Indirect impact 16. The construction of the main road connecting urban centers and the construction of embankment and road on Tri river banks in Component 1 will cause rise in elevation of roads and embankment compared with the existing elevation of residents’ houses along the road. As surveyed data of Consultant, the elevation rise of the main road work item will be 1-1.5m while the embankment rise is about 4m. 17. There will be solutions for the drainage system so that the road/embankment elevation rise will not affect existing drainage capacity. In particular, on the route, bridges will be constructed for the road section passing the river branches, cross culverts will be constructed for road section passing canal/ditch and watershed…in combination with other culverts on the route to serve the water drainage along the route. All drainage system will be considered in terms of cross section, length, slope, elevation… to ensure easy and convenient drainage from upstream to downstream without causing inundation and water lodging in the project area. Road elevation higher than house's elevation will cause difficulty for people's access. Therefore, the proposed technical solution is to connect sloping the existing road with the new trunk road and to construct feeder roads connecting with the exising roads leading to the new trunk road. 2.9. Impact mitigation measures 18. To ensure involuntary resettlement is avoidable and/or mitigatable where is possible key principles for selecting work items for component 1 were agreed with the World Bank and participating provinces as follows: (i) proposed work items should be constructed on the existing works or on the public land; (ii) land acquisition and relocation must be minimized where is possible by applying alternative design measures; (iii) Where land acquisition is unavoidable, a resettlement action plan (RAP) is prepared in compliance with OP4.12 of the World Bank on involuntary resettlement to ensure all affected assets and affected households are included in the RAP and will be compensated at replacement cost and assisted to at least restore their livelihoods and living standard to pre-project level. 19. Accordingly, in the stage of feasibility study the following criteria were applied to select work items to minimize unexpected resettlement impacts: Page 16 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province - During the project preparation, the PMU cooperated closely with technical consultant and resettlement consultant to conduct survey, study location and scope of each work item in order to propose the most optium design solution to minimize household land acquisition. Technical options including reducing design scope and road width are proposed for work items as follows: o The main road connecting urban centers: (i) to adjust the alignment not affecting households; (ii) to reduce road width from 60m to 20m, then the relocated households will be reduced from 29 households (initial option) to 14 households. o Tri river embankment: To line the embankment as its existing alignment, embankment can encroach to the river bed if the river bed is wide in order to avoid impact on household’s land. o Wastewater collection and treatment system: (i) the wastewater treatment plant will be constructed on an agricultural land which has been abandoned by people and far from residential area due to its poor condition for cultivation; (ii) sewer can be laid on sidewalk or under road bed. - During the preparation of the project and the development of the RAP, many community consultations with stakeholders, including PAPs have been organized by the PMU and the resettlement consultant in the project area. During consultations, a number of issues were discussed, such as project designs, mitigation measures, compensation and assistance policies of the project, income restoration programs for severely affected HHs to provide suitable solutions. All residents supported the project and expected the project to be implemented soon. - In order to minimize impacts on HHs living on both sides of the road during the construction phase, the resettlement consultants consulted with the local authorities and the HHs living there, to bring out the mitigation measures appropriate to each local area. These mitigation measures will be applied during each step of construction to minimize negative impact on local people. - Construction schedule will be publicly informed to local authorities and affected households, so that AHs have plans to cultivate or harvest accordingly. - The resettlement consultant firm has also organized the meetings with the design consulting units of the project to discuss about location of the local works, public works and the selection of design solutions in order to avoid/minimize negative impacts on local people, etc. At the same time, develop criteria together to minimize impacts during the construction process such as establishment of occupational safety plans (in case construction is close to residential areas), arrangement of suitable materials and tools (signboards, partitions with residential areas, etc.), time, and construction schedule and so on. PART 3: OBJECTIVES OF THE RESETTLEMENT ACTION PLAN 20. The Resettlement Action Plan is prepared for ha Tinh subproject based on the World Bank’s Operation Policy (OP 4.12) on involuntary resettlement and the laws and regulations of the Government of Viet Nam on land acquisition, compensation, support and resettlement when the state recovers land and integrated regulations/decisions of Ha Tinh province on land acquisition, compensation, support and resettlement. This Resettlement Action Plan ensures Page 17 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province ability of the subproject to (i) avoid involuntary resettlement where is possible; (ii) minimize involuntary resettlement by alternate design solutions and compensation where land acquisition is unavoidable; (iii) improve or at least restore affected people’s living condition equal to their pre-project living standard; and (iv) improve living standard for the poor and the vulnerable households. 21. Based on these principles, main objectives of the resettlement action plan include: - Determining accurately and sufficiently impacts, loss of land, houses, structure and other assets for all affected individuals and organizations. - Establising criteria, eligibilities, and entitlements for compensation, support and resettlement. - Arraranging sufficient resettlement areas for relocated households. - Implementing supportive programs to minimize difficulties for affected households during and after land acquisition and relocation, ensuring that living condition of the relocated households at their new residences to be “better or at least equal” to their pre- project living conditions. - Ensuring provision of sufficient and timely budget for payment of the compensation and assistance for affected persons. - Ensuring timely handing over land for construction as project’s general schedule. - Promoting involvement of affected persons and community in preparation, implementation and supervision of the resettlement action plan. - Establishing a grievance redress mechanism to ensure all complaints of APs will be resolved timely, satisfactorily, and transparently. - Establishing a mechanism of consultation, participation and supervision of affected people. 22. This Resettlement Action Plan is prepared based on the project’s basic design and quick survey on the replacement cost. Main outputs of the plan will be included in the Feasibility Study report to ensure Government’s budget allocation for the project implementation. This Resettlement Action Plan will be updated after completing the detailed design, detailed measurement survey and replacement cost survey. Page 18 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province PART 4: SOCIO-ECONOMIC PROFILE OF AFFECTED HOUSHEOLDS 4.1. Socio-economic survey’s objectives and surveying method 4.1.1 Ojectives 23. Generally, the socioeconomic survey on affected households helps understand the overall context of the subproject area and current socioeconomic status of affected households. It also provides inputs for preparation of resettlement instruments and designing livelihood restoration measures more relevant to the context of affected households to ensure the sustainability of the project entitlements. 24. Specifically, the Socioeconomic Survey (SES) aims to collect, from affected households, information on a) their demographic characteristics, b) occupations, c) living standards (income, expenditure, loan/credit, health status, environmental sanitation, water access, participation of PAP in local groups, social bonds), d) vulnerability of affected households, e) project impact on people’s assets, including its cumulative impact at household level, f) consultation with PAP on the potential impact (self-assessment) and mitigation measures, g) their ability to restore their livelihoods, h) preference on resettlement options, and i) their support for project implementation. 4.1.2 Survey methods 25. The socio-economic survey (SES) was conducted to collect socio-economic information of the affected households (including information on demographic characteristics, occupation, income and livelihood, ethnicity, educational level, their accessibility to social and physical infrastructure services and their interests). The survey was carried out from June to July 2017 26. Besides, Consultant also studied related documents like Statistic yearbook, annual socio- economic reports of the city, province and wards…to search basic information on the project area. 27. Inventory of losses (IOL) was conducted on all affected households and assets based on the basic design. 28. Replacement cost survey: The replacement cost survey (RCS) aims to collect market price of land and non-land assets in the project area to establish a required budget source for paying the compensation for other impacts at the market price applying at the time of compensation. Detailed replacement cost survey will be conducted during implementation of resettlement action plan by experienced specialists to determine unit price for each type of affected asset and submitted to the Provincial People’s Committee for approval. The approved replacement cost will apply for compensation. 29. Beside, qualitative methods were also applied. Numbers of focus group discussions and in-depth interviews are showed in the table: Page 19 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Table 6: Qualitative method Focus group discussions 5 In-depth interviews Business households 3 Relocated households 14 Head of villages 5 Representative of CPC/CPT 5 Representative of DPC 2 Total 34 4.2. Ky Anh town’s socio-economic overview 4.2.1. Natural conditions 30. Ky Anh town is located in the southeast of Ha Tinh province, at coordinates of 18°07′35″ N- 106°15′27″E. Ky Anh town borders with the East Sea to the north, Ky Anh district to the west and the northwest, with Quang Trach district of Quang Binh province to the South. The town was established by the modification of administrative contour of the former Ky Anh district under the Resolution 903/NQ-UBTVQH13 dated 14/4/2015 to include 6 wards namely (Song Tri, Ky Trinh, Ky Thinh, Ky Long, Ky Lien, Ky Phuong) and 6 communes namely (Ky Ninh, Ky Ha, Ky Hoa, Ky Hung, Ky Loi and Ky Nam). 31. Ky Anh town has total natural land area of 28,221.67 ha of which the agricultural land area is 7,284.82ha, forest land area is 8,518.46ha, aquacultural land area is 711.96ha, non- agricultural land is 8,746.46 ha and un-used land area is 2,842.08ha. 4.2.1. Socio-economic status of Ky Anh town a. Economic conditon 32. Ky Anh town is gradually developing with rather high economic growth rate, over 20% per year and GDP per capita per year is VND 40 million in 2016 higher than the province’s average rate of VND 32.3million. Table 7: Economic growth rate and comparison of Ky Anh town’s GDP and Ha Tinh province’s average GDP per capita Ky Anh town’s GDP/per Ha Tinh province’s Year Growth rate (%) capita/year (million dong)1 GDP/per capita/year2 2016 24.04 40 32.3 2015 24.17 45 38.9 2014 22.2 35 34 Source: Ky Anh town’s socio-economic condition and Ha Tinh province by years 33. Economic structure changes drastically, towards decrease in agriculture an increase in industry and service. Data by years 2014, 2015, 2016 is presented as follows: 1 Current price 2 Current price Page 20 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Table 8: Percentage of economic sectors by years Agriculture – Forestry – Industry – Small industry & handicraft – Trade – Year Fishery (%) Construction (%) Service (%) 2016 3.76 67.96 28.28 2015 3.33 67.14 29.53 2014 5.96 64.2 29.85 Source: Ky Anh town’s socio-economic report by years b. Social conditions  Population 34. By the year 2015, Ky Anh town has population of 71,399 people (20,396 households). All the town residents are Kinh people, with 41,492 people living in urban areas (equivalent to 58.11%) and 29,907 people living in rural areas (41.89%). Male population accounts for 50.46% (36,029 people) while female population accounts for 49.54% (35,370 people). Table 9: Population distribution in project ward/commune Existing population Density (people/ No Administrative unit Area (km2) (people) Km2) Ky Anh town 2,822.1670 71.399 25 1 Song Tri ward 51.829 10,736 207 2 Ky Phuong ward 374.080 5,847 16 3 Ky Lien ward 128.627 2,956 23 4 Ky Long ward 213.070 5,267 25 5 Ky Thinh ward 403.250 10,834 27 6 Ky Trinh ward 479.502 5,852 12 7 Ky Ha commune 100.570 5,564 55 8 Ky Hoa commune 319.808 4,657 15 9 Ky Hung commune 147.826 1,529 10 10 Ky Loi commune 207.729 9,370 45 11 Ky Nam commune 180.907 2,215 12 12 Ky Ninh commune 214.969 6,572 31 Source: Statistical yearbook of Ky Anh town in 2015)  Labor structure 35. According to statistical data in 2016, labor and employment of Ky Anh town as follows: Page 21 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province - Labor in working age is 38,361 persons accounting for 53.7% of the town’s total population, in which 30,146 people are working in economic activities, accounting for 78.6% of total labor in working age, and 8,215 people are students and disabled people not joining in economic activities. - Employed labor accounts for high percentage, about 30,079 people, working in following sectors: o Agriculture, forestry and fishery: 10,419 people; o Industry and construction: 8,437 people; o Trading and service sector: 11,233 people. Figure 2: Labor structure in economic sectors in 2016 (Source: Ky Anh town People’s Committee, 2016) - Percentage of skilled labor is rather high: 15,672 people. Educational background of the labor is presented in Figure 3 Figure 3: Educational background of labor (Source: Ky Anh town People’s Committee, 2016) Page 22 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province  Poverty 36. Based on the National Poverty line 2016 - 2020, the percentage of poor households in Ky Anh town is 17.25%, higher than the province’s average percentage which is 10.37%. This is due to the fact that Ky Anh town was severely suffered from floods and environmental disaster in 2016. There is a big difference in poverty between wards/communes, Ky Thịnh ward has the highest percentage of the poor (35.13%). This is due to the fact that Ky Anh town has been newly established and some of its wards have been established from communes. Wards like Ky Thinh, Ky Trinh, Ky Ninh…mainly rely on agricultural production while the land is poor and production is difficult, leading to poor output. These wards are also located in the area where there are frequent occurrence of natural disaster and floods. Therefore, the poverty rate in some wards is higher than in some communes. Detailed percentages of the poor and near poor households in wards/communes are presented in Table 10. Table 10: Percentage of poor and near poor households in Ky Anh town in 2016 Poor and near poor households in Ky Anh town Poor household Near poor household No. Ward/commune Number Number Number Number Percentage Percentage of HHs of people of HHs of people 1 Ky Anh town 3,694 8,807 17.25 1,865 7,125 8.71 2 Song Tri ward 176 413 5.42 53 228 1.63 3 Ky Trinh ward 358 747 20.50 79 268 4.52 4 Ky Thinh ward 1,102 3,726 35.13 480 1,947 15.30 5 Ky Long ward 148 271 11.63 87 287 6.83 6 Ky Lien ward 151 312 14.45 52 143 4.98 7 Ky Phuong ward 283 471 15.64 116 309 6.41 Ky Ninh 358 555 16.50 108 318 4.98 8 commune 9 Ky Ha commune 225 393 14.16 73 212 4.59 10 Ky Hoa commune 142 211 10.12 99 252 7.06 Ky Hung 24 43 4.79 19 62 3.79 11 commune Ky Nam 119 285 15.87 98 389 13.07 12 commune 13 Ky Loi commune 608 1,380 22.20 601 2,710 21.94 (Source: Ky Anh town People’s Committee, 2016) 4.3. Socio-economic status of affected households 37. Following is analysis of results of the socio-economic survey on 150 affected households which was conducted by Consultant from June to July 2017. Page 23 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province 4.3.1. Demorgraphic characteristic 38. Gender and age: Among 150 surveyed households with total 538 people, there are 258 men (accounting for 48%) and 280 women (accounting for 52%), representing no big gap in gender. People under 18 years old account for 2.5%, people from 18-60 account for 61.2% and people over 60 account for 16.4%. In general, the surveyed area has rather high percentage of working young population (2.41 people/HH). 39. Household size: On average, there are 3.59 members in each affected household, popular rate is 4 people/household; the biggest household has 9 members and the smallest household has 1 member (in this survey, household member is number of people living in a family and sharing the same household registration book). Information on the average household size will help to estimate number of households separable when implementing resettlement.. 40. Ethnicity: Survey results showed that affected households in the project area are all Kinh people (100%), no HHs belonging to an Ethnic minority group was found in the project area. 4.3.2. Education 41. Education level of head of household: Among the surveyed people, most of the household heads have high school degrees (64.5%). Household heads with secondary school and primary school education level account for 8.5% and 19.9%, respectivelyand only 0.7% household heads are illiterate. Household heads with college/university educational level account for 6.4%. 42. Generally, education level of members of affected households is not very high. Percentage of affected household member being illiterateis 9.1%, most of them are the elderly -. 10.6% household members have primary school degree level, most of family members have secondary school degree (44,2%) and high school degree (24.9%); college/university (9,3%) and post graduate degree (0.7%). 9.1% of family members are at pre-school age. Information on educational background is one among the basis for orienting the job change support for affected people at working age. With popular educational background of secondary school and high school levels, all stakeholders have discussed to project appropriate jobs and employment source for people in line with local general planning. The educational backgrounds of affected people are presented in following table. Table 11: Educational background of household head and member Head of household Member Education level Frequency Percentage Frequency Percentage Pre- school 0 0.0 49 9.1 Illiterate 1 0.7 6 0.9 Primary school 13 8.5 57 10.6 Secondary school 96 64.5 238 44.2 High school 30 19.9 134 24.9 College/university 10 6.4 50 9.3 Post graduate 0 0.0 4 0.7 Total 150 100.0 538 100.0 Page 24 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province 4.3.3. Occupation and Employment 43. The occupations of surveyed heads of households are diverse including: agricultural sector (82.0%), retirement (6.0%), government employees (4.0%), trade/service (3.3%). 44. Most of household members earn living by working in agriculture – forestry – fishery (this group accounts for 51.5% of total surveyed member). A small percentage is retired people and government employees with stable monthly income (accounting for 10.4%). Number of households running businesses/opening shops (mainly at the market or at home) accounts for 1.2%. Students and pupils account for a relatively high percentage of 24.2%. This result shows that, on average, percentage of dependent people in households is rather high with over 30% including people with no income (including housewives), the elderly (no pension), small children and pupil/students... 45. During the survey, the consultant found that, with this occupational characteristic, the settling at new resettlement site may cause initial difficulties for the people doing business, particularly those opening shops/doing business at home or near their house. If they want to maintain their old profession, this group will have difficulty changing the business environment, looking for new customers. Farmer groups are also vulnerable if they displace. The remaining groups do not have any particularly negative effects, except for the initial time period for people to adapt to new environment and changes. In addition, with the policy of on-site resettlement (by conversion of agricultural land into residential land if available), the challenge for households to access education, transportation and health is not great. Table 12: Employment of HH’s head and member Head of household Member Employment Frequency Percentage Frequency Percentage Government employee 6 4.0 21 4.2 Retired 9 6.0 31 6.2 Agriculture – Forestry – Fishery 123 82.0 258 51.6 Worker 2 1.3 18 3.6 Small industry 1 0.7 8 1.6 Trade/service 5 3.3 7 1.4 Hired job 4 2.7 29 5.8 Pupil/student 0 0.0 121 24.2 Unemployed 0 0.0 7 1.4 4.3.4. Household income and expenditure 46. Income: nearly 60% surveyed households have main income source from agricultural production. In addition, 16.7% households have income source from salary. Average income of surveyed households in the survey is about 8.1 million dongs/month. However, popular income is 5 million dongs/month and the highest income is 43 million dongs/household/month while the lowest income is 1 million dong/household/month. Page 25 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province 47. Expenditure: According to surveyed result, average expenditure of surveyed household is 5.8 million dongs/household/month but the most popular expenditure is about 6 million dongs/household/month, higher than the average monthly expenditure. 48. Saving: With mentioned income and expenditure, average saving of household in a year is around 2 million dongs/month. However, in general, most of households do not have savings and usually face fiscal deficit about 1 million dongs/household/month on average. 49. Vulnerable group: Vulnerable group in the project area includes: (i) Poor household, (ii) single women as head of household with dependent people; (iii) social policy household; 50. Screening results on vulnerable group show that no ethnic minority household was found in the project area. There is 10.7% poor household (according to Multidimensional Poverty Index), 4.0% is female headed households with dependents, 8.0% is policy households and single elderly household. 4.3.5. Sanitation, public health and medical service 51. Water source: Most of surveyed households use bored well water (60%), dug well water (30.7%). Currently, about 4.1% of households use tap water and 2.7% use rainwater for bathing and washing for "cost savings" and "due to habbit". 52. Sanitation: Most of surveyed households are aware of the importance of hygienic latrines and conditions for the construction of septic toilets (97.3%). Only 2.7% of households currently are using 1-compartment toilet but already have plans to upgrade to two-compartment toilet. 53. Energy: The energy source for lighting system is electric power from the national grid with percentage of 100% of households using this source of electricity. The main source of fuel for cooking is gas (73.3 %), wood (20.7%), coal (0.7%) and other sources 5.3%. 54. Disease: Due to the increasing community’s awareness, not many cases of infectious diseases and environmental pollution –borned diseases such as malaria and cholera have been reported. Popular diseases in the community include flu, respiratory (26.7%) and other chronic diseases such as diabetes, blood pressure, bone degeneration (0.7%). 55. People’s access to medical service is rather easy with average distance to ward/commune medical treatment station around 2km and 5km to the town hospital. Private clinics and drugstores also provide increased access to health care for the affected community. 4.3.6. Affected household’s asset ownership 56. House: All AHs own their own houses. Households with grade 4 house (brick walls and roofs) account for 75.6%, solid houses with 2 or more floors account for 17.3% and wooden houses account for 6.1% 57. Assets: Households have assets such as radio (65.3%), motorbikes (64.7%), telephones (78%), refrigerators (62%), air conditioners (15.3%), heaters (18.7%), automobiles (2.0%) and farm machines (0.7%). 4.3.7. Debt and utilization of credit 58. 26% of surveyed households or their member have at least one debt at bank . The average debt is 1.3 million VND. The biggest debt is 500 million VND and the smalest debt is Page 26 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province 200 thousand VND. Household borrowing purposes are 37.1% for repairing houses, 25.7% for children's education, 20% for medical treatment, and there are other purposes such as property purchases, household utensils and daily expenses. 4.3.8. Participation in local social network 59. According to surveyed results in the project area, there are socio-political organizations such as Youth Union, Women's Union, Veterans Association, Elderly Association, Farmers' Association with great amount of members from all social components. 60. Survey results show that almost all surveyed households participate in these socio- political organizations: 48.7% of households participating in Youth Union with 95 members; 67.3% of households with 142 members participate the farmer Association (ie, households with two members). The Women's Union is a group for women only, with 61.3% of surveyed household participating (92 members); Veterans Association with 19.3% of households (31 members) and 24% of households joining the Elderly Association. 4.4. Land use of affected households 61. In the five project wards/communes, the survey for determining validation of the land use right certificate was conducted in the affected communes, showing that at the time of initial inventory of loss, all affected households have land use right certificates. 4.5. Gender issues 62. Labor division: There is a quite difference of gender division by main occupational characteristics of affected households. - 71.2% surveyed people said that women take main responsibility for housework and taking care of children and the elderly in the family. 63. For making living/earning income, in the project area, women usually do farming work and are also suitable for doing business, small shops (grocery shops, street vendors, hair cut…) with percentage of 69.7%. Men mainly work as hired labor (construction, porter or labor export ...). Women contribute about 30% of total household income. These analyzes show that employment opportunities and adaptability to career change are an obstacle for local women. In case of resettlement and relocation, women are more affected than men, especially middle-aged single women .Property’s ownership: According to the Land law 2013, husband and wife should have their name in their land use right certificate (LURC). However, the surveyed results show that, 31.5% of surveyed people said their land use right certificates bear only husband’s name while the percentage for wife holding name in the land use right certificate is 15.3%. This issue will be taken into account when issue LURC for relocated households of the subproject. 64. Participation in public meeting: Survey on participation in community activities and participation in local organizations shows that there is not much difference in gender. 69.4% of respondents said that both women and men participate in community and local meetings. 65. Making decision for family issues: For family decisions making, the results show that in most of surveyed households, both men and women participate in discussing and making Page 27 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province decisions. For purchasing family’s assets and decision on spouse’s education, the percentages are 46% and 69.3%, respectively. For decisions in changing careers, borrowing money to do business and holding name in property ownership, men often play the main role and main decision-maker in the family. 66. Gender issue of the subproject: - The project implementation will meet the needs for local socio-economic development. With the proposed items, men and women are equally benefited in access and use including travel and trade exchanges; environmental sanitation, development of new livelihoods. - The good transportation system also facilitates the trade and market access of women groups. However, it is possible that men will participate more deeply in the distribution and trading activities due to an increased volume of goods. For the group of women in the agricultural community, the project may facilitate the transition from farming sector to small trading or workers who have monthly income. - People participating and making decision on the project: In fact, the project policy was formed during the process of developing a common development strategy with vision 2030-2050 in Ky Anh urban area. At the micro level, however, local communities have the right to participate in discussions and consultation on issues related to their lives such as selection of civil works, project design, compensation policy, livelihood restoration progam. Public consultation helps the Consultant obtain information on the area including sensitive places, cultural works that need to mitigate the impacts. As a matter of fact, the number of men attending meetings is always higher than that of women. However, the number of comments from both sexes is quite similar; There were many opinions expressed by women and get high consensus from men - Job opportunities for unskilled workers will be available for the construction. During the construction, local households have an opportunity to earn income from the project. To ensure that labour opportunities will benefit the local people and their household economy, both men and women, it should contains special requirements for contractors concerning employment of local male and female labour force in the PMU’s documents. - Aside from the potential benefits, the project may increase some women’s vulnerability to potential negative impacts as a result of land acquisition and construction work. The mitigation of these impacts are assessed in the Resettlement Action Plan. - The potential temporarily occurring health impacts (noise, dust etc.) on the local population during the construction period are assessed in and will be mitigated in accordance with the Environmental Management Plan. - The construction of the items will bring external, mainly male labour force to the project area. Experience shows that the spreading risk of HIV/AIDS and other sexually transmitted infections (STIs) may increase. Especially young women and girls are vulnerable for these risks. It requires a consideration of stakeholds in the implementation phase. which addressed in the ESIA which include (i) child labor: require all contractors not using child labors, (ii) ensure principle equal work, equal pay in implementation Page 28 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province progress project; (iii) conduct communication and disseminate information on HIV/AIDs and labor Law among women. 4.6. Other social impacts a. Potential negative impacts: 67. The Social Impact Assessment (SIA) was conducted including census, socio-economic survey and inventory of losses (IOL) and community consultation to identify the positive and negative impacts caused by the project and at the same time to propose mitigation measures for minimizing negative impacts and increasing benefits for the people in the project area. The social impact assessments indicates that land acquisition will affect the income, livelihoods and lives of affected people. 68. During construction of the project, the contractor can mobilize a large workforce from the outside. This may generate a number of potential social risks for communities living in the project area such as social evils, gambling, drugs, conflicts with local people, gender based- violence (GBV) and the risk of disease transmission especially for women, such as sexually transmitted diseases like HIV, syphilis ... In addition, during construction, environmental pollution such as dust, noise, construction waste can affect local people living surround construction sites. These impacts can be mitigated through mitigation measures proposed in the project EMP. PMU and external monitoring agency will closely monitor potential social risks caused by labor influx to communities surrounding project areas. b. Positive impacts: 69. The project will bring about positive effects for local people in general and women in particular. The expected effects are as follows: - Improve traffic conditions in the project area; Reduce the cost and travel time of the people; - Improve the environmental and sanotation conditions and improve the quality of life of the people in the project area, reduce diseases related to environmental sanitation; - Create new jobs for local people to improve their incomes especially for the poor and vulnerable groups; - Provide opportunities to empower women and increase their participation in community activities; - Directly contribute to poverty reduction in the project area. c. Mitigation measures of negative social impacts 70. To improve project efficiency and minimize negative social impacts, following mitigation measures need to be implemented: - During all project phases, project staff will disseminate project information and carry out extensive public consultation with local people to ensure that the affected people and beneficiaries avoid negative social impacts on them. Page 29 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province - During construction phase, the Contractor shall prioritize the hire of local labor to carry out simple work for the project, properly implement the site rules and train workers on occupational safety measures. - To avoid environmental impacts, measures proposed in the EMP should be taken to minimize dust, noise and restore the quality of existing roads if construction vehicles damage roads. - Local government and Contractor need to collaborate with local social-political organizations to organize training courses on: (i) gender and equality; (ii) prevention of HIV/AISD and social evils and (iii) environmental sanitation. - PMU and external monitoring agency will conduct regularilly internal and periodically external monitoring on labor influx. PART 5: RESETTLEMENT POLICY FRAMEWORK 71. The legal framework for dealing with resettlement impacts of the project is based on relevant policies and regulations of the Government of Viet Nam and involuntary resettlement policy (OP4.12) of the World Bank. In the event of a discrepancy between the GoV policy and the Bank's policy, the Bank’s policy will apply. 5.1. World Bank’s Involuntary resettlement policty (OP4.12) a. Objectives of OP4.12 72. The Operation policy (OP4.12) pays special attention to development objectives in resettlement activities and emphasizes the need to support vulnerable groups to achieve development goals. Hence, this policy objective is aimed at. - Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. - Where it is not feasible to avoid resettlement, resettlement activities should be conceived and executed as sustainable development programs, providing sufficient investment resources to enable the persons displaced by the project to share in project benefits. Displaced persons should be meaningfully consulted and should have opportunities to participate in planning and implementing resettlement programs. - Displaced persons should be assisted in their efforts to improve their livelihoods and standards of living or at least to restore them to pre-project levels. b. Principles of involuntary resettlement - Ensure that displaced persons, affected households are provided with: (i) full and free information on all project activities, (ii) regardless of legal status, affected household assets shall be compensated and supported (iii) compensation at replacement cost, (iv) livelihood of the affected persons/households will be restored equal to or better before the project, (v) having independent complaint and petition mechanism. - Use participatory methods in designing and executing projects to ensure that the design and construction methods integrate the needs of all population groups, especially disadvantaged groups. Page 30 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province 5.2. Legal framework on compensation, site clearance and resettlement of Viet Nam 73. The Constitution of the Socialist Republic of Viet Nam (2013) confirms the right of citizens to own and protects citizens’ ownership of house. In addition, the Government has enacted a number of laws, decrees and regulations that constitute the legal framework for land acquisition, compensation and resettlement. The principal resettlement documents include the Land Law No. 45/2013/QH13 dated 29/11/2013 detailing the regulations on land management in Viet Nam; the Decree No. 47/2014/ NĐ-CP dated 15/5/2014 on Compensation, Assistance, and Resettlement when the State Recovers Lands; the Decree No. 44/2014/NĐ-CP dated 15/5/2014 on land price determination method and Land Prices when the State recovers land and the Decree No. 43/2014/NĐ-CP dated 15/5//2014 on Detailed Regulations on Implementation of the Land Law; the Circular No. 37/2014/BTNMT dated 30/6/2014 on Detailed Guidance on Compensation and Assistance when the State Recovers Land; and Circular No. 36/2014/TT- BTNMT dated 30/6/2014 guiding the implementation of the Decree No. 44/2014/ND-CP. 74. The laws, decrees and regulations, decisions related to information disclosure include Article 67 of the Land Laws, No. 45/2013/QH13, requiring information disclosure to affected households before commencing the acquisition of agricultural land and non-agricultural land. 75. Decisions by Ha Tinh Provincial People's Committee on land acquisition and resettlement include: - Decision No. 94/2014/QD-UBND dated 27/12/2014 by Ha Tinh Provincial People's Committee promulgating the unit price of land categories in the period 2015-2019. - Decision No. 75/2014/QD-UBND dated 3/11/2014 by Ha Tinh Provincial People's Committee on compensation policy, assistance and resettlement when the State recovers land in Ha Tinh province. - Decision No. 01/2016/QD-UBND dated 08/01/2016 by Ha Tinh Provincial People's Committee promulgating the "Price of all types of houses, buildings, graves, boats, fishing equipment and tools " acquired by the State in Ha Tinh province. 5.3. Key gaps between the World Bank’s Involuntary Resettlement policy and the GoV’s laws and regulations. 76. With the promulgation of the Land Law 2013 and Decrees mentioned above, the regulations and policies on land acquisition, compensation, support and resettlement issued by the Government of Vietnam have become more consistent with the World Bank's involuntary resettlement policy (OP4.12). However, there are still some significant gaps between the Government's policy and the WB's policy on resettlement. The table below provides an analysis on the key differences and propose measures for filling the gaps applying to the project. Page 31 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Table 13: Key gaps between GoV’s policies and the World Bank’s policies on compensation, assistance and resettlement and policies applied for this project Issue WB GOV Proposed solution for project Policy DPs should be assisted in The law doesn’t specifically Livelihoods and income sources objectives their efforts to improve mention the policy will be restored in real terms, at their livelihoods and objectives. However, there least, to the pre-displacement standards of living or at is a provision of support to levels or to levels prevailing least to restore them, in be considered by PPC/CPC prior to the beginning of project real terms, to pre- to ensure they have a place implementation, whichever is displacement levels or to to live, to stabilize their higher. levels prevailing prior to living and production. the beginning of project (Article 25 of Decree 47). implementation, whichever is higher Severely Losing 20% (10% for Losing 30% productive land Losing 20% (10% for vulnerable affected vulnerable households) households) of productive land household of productive land or or income generating assets income generating assets Compensation a. Agriculture land: a.Agricultural land used a. Agricultural land used before for illegal land PAPs are supported in before 1/7/2004 is 1/7/2004 will be compensated at resettlement instead of compensated; Used after 1 100% replacement cost; used compensation for the July 2004 is not after 1/7/2004 is assisted for land they are compensated but assisted livelihood restoration not less according to decision of the than 60% of land compensation occupying/using, and PPC value at replacement cost. other supports, to achieve the b. Residential land: no b. No compensation for illegal resettlement objectives compensation for land. If residential land, but provision of stated in OP4.12, if the PAP has not residential land resettlement assistance not less land area encroached or house in the project than 30% of land compensation commune/ward they will be value and other supports before the official cut- allocated a standard according to decision of the PPC. off date; plot/apartment in For displaced cases, if user has b. Non-agriculture land: resettlement site and have to no land/house in the project no compensation but pay land use levy. commune/ward they will be user will get resettlement allocated a standard land assistance. plot/apartment in resettlement site with land use levy; if the land user can not afford to pay for land use levy, they will be debited. Compensation Compensation at No compensation but Financial assistance equal to for property on replacement cost for all financial assistance 100% value of compensation at illegal land or affected structures if depending on specific case replacement cost. In case, at time illegal structures constructed before the cut- decided by competent of construction of structure, local off date regardless of legal agencies. authorities have announced status of land use of the household and/or prevented the PAP’s. construction and recorded by the minute but household has not followed, local government policy will apply. If no minute Page 32 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Issue WB GOV Proposed solution for project recorded, the Bank policy will apply. Compensation Compensation rates for Compensation for land at Independent appraiser identifies rates for land and affected land and non-land specific land price (market replacement costs for all types of non-land assets assets including houses and price) of affected land; lands and non-land assets affected, structures are replacement Compensation for living house which are appraised by provincial costs without depreciation at the cost enough for land appraisal committee and and deduction of constructing new house with approved by Provincial People’s salvageable materials. similar technical standard; Committees to ensure full Compensation for other replacement costs. structures at current value but not exceed cost for new construction of the affected structure. Consultation, Consultation with and Focus mostly on PAPs should be disclosed full participation Participation of PAPs consultation during information of the project, and disclosure in planning, implementation of including policy of implementation, and resettlement (consultation resettlement, involved in all monitoring of the on draft plan of stages of the project, and project, including compensation, support consulted in activities and implementation of and resettlement and policy of the project. resettlement. plan for training, career change and facilitating job searching); information sharing and disclosure. Cup off date Cut-off date of compensation and assistance for all works will be the date of public announcement on land is the date when the acquisition to DPs. At this inventory of loss for Cut-off-date is the date time, the delineated project preparation of the when the decision on land area must be completed and resettlement action acquisition is disclosed DMS could start. All assets plan is completed. and people who will move to the project area after the mentioned dates will not be entitled to compensation. Monitoring implementation Internal and Citizens are allowed to Both internal and external of resettlement independent supervise and report on (independent) monitoring is monitoring is required breaches in land use to be regularly maintained and management on (on a monthly basis for their own (or through internal and biannual basis representative for independent monitoring). Page 33 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Issue WB GOV Proposed solution for project organizations), including An end-of-project evaluation land recovery, on the implementation of compensation, support resettlement is required and and resettlement (Article report will be prepared to 199, Land Law 2013). confirm whether the However, there is no objectives of OP 4.12 were explicit requirements on achieved. resettlement monitoring, including both internal and independent (external) monitoring. 77. As a WB member country, the GOV has committed that the international agreements signed or acceded to by GOV with the WB contain provisions different from those in the present resettlement legal framework of Vietnam, the provisions of the international agreements with the WB shall prevail. According to Clause 2 of Article 87 of the Land Law 2013, “for the projects using loans from foreign and international organizations for which the State of Vietnam has committed to a policy framework for compensation, support, resettlement, the framework shall apply". 5.4. Cut off date 78. Cut-off date of the project for compensation and assistance for all works will be the date of public announcement on land acquisition by Hà Tĩnh PPC to DPs. At this time, the delineated project area must be completed and DMS could start. All assets and people who will move to the project area after the mentioned dates will not be entitled to compensation. PART 6: PROJECT POLICIES ON COMPENSATION, ASSISTANCE AND RESETTLEMENT 6.1. Eligibility 79. The eligibility for entitlement to compensation is determined by asset ownership criteria: - Those who have formal legal rights to land (including customary and traditional rights recognized under the laws of the country. In the consideration, it is also useful to document how long they have been using the land or the assets associated with it); - Those who do not have formal legal rights to land at the time the census begins but have a claim to such land or assets provided that such claims are recognized under the laws of the country or become recognized through a process identified in the resettlement action plan; - Those who have no recognizable legal right or claim to the land they are occupying. 80. Persons covered under (i) and (ii) are provided compensation for the land they lose, and other assistance. Persons covered under (iii) are provided resettlement assistance in lieu of compensation for the land they occupy, and other assistance, as necessary, to achieve the Page 34 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province objectives set out in this policy, if they occupy the project area prior to a cut-off date established by the borrower and acceptable to the Bank. Persons who encroach on the area after the cut-off date are not entitled to compensation or any other form of resettlement assistance. All persons included in (i), (ii), or (iii) are provided compensation for loss of owned or used assets other than land. 6.2. Resettlement principles of the project 81. The principles mentioned in the World Bank’s OP 4.12 and regulations of Government of Viet Nam are used for the preparation of the project Resettlement Action Plan with key principles as follows: - All Project Affected People (PAP) who have assets within or reside within the area of project before the cut-off date are entitled to compensation or/and assistance for their losses. Those who have lost their income and/or livelihood will be eligible for livelihood rehabilitation assistance based on the criteria of eligibility defined by the project in consultation with the PAPs. If, by the end of the project, livelihoods have been shown not to be restored to pre-project levels, additional measures will be provided. - The compensation rates will be determined based on the results of independent appraisal of the land/crops/assets (associated with the land) at time of resettlement implementation in a consultative manner. All fees and taxes on land and/or house transfers will be waived or otherwise included in a compensation package for land and structures/or houses or businesses. The local authorities will ensure that PAP choosing relocation on their own, obtain, without additional costs, the necessary property titles and official certificates commensurate with similar packages provided to those who choose to move to the project resettlement sites. - Land will be compensated “land for land” if the local land fund is available, or in cash, according to PAP’s choice. The choice of land for land must be offered to those loosing 20% or more of their productive land. If land is not available, the borrower must assure itself to meet the Bank’s requirements that this is indeed the case. Those loosing 20% or more of their land will have to be assisted to restore their livelihood. The same principles apply for the poor and vulnerable people losing 10% or more of their productive landholding. - PAPs who prefer “land for land” for residential land will be provided with land plots with the equivalent value for lost lands or a combination of land (a standard land plot) in a new residential area nearby the original resident, and cash adjustment for difference between value of their lost land and the land plots provided. The resettlement area will be planned properly and implemented in consultation with the PAPs. All basic infrastructures, such as paved roads, sidewalks, drainage, water supply, and electricity and telephone lines, will be provided. - PAPs who prefer “cash for land” will be compensated in cash at the full replacement cost. These PAPs will be assisted in rehabilitating their livelihoods and making their own arrangements for relocation. - Compensation for all residential, commercial, or other structures will be offered at the replacement cost, without any depreciation of the structure and without deduction for salvageable materials. Structures shall be evaluated individually. Any rates set by Page 35 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province category of structure must use the highest value structure in that group (not the lowest) to ensure PAP can build a new structure with similar technical standard and category. - Households who have to relocate but ineligible for compensation for affected land and have not any land or house within the project commune/ward will be entitled to buying a minimum plot or house in resettlement site and resettlement assistance in cash. - PAPs will be provided with full assistance (including a transportation allowance) for transportation of personal belongings and assets, in addition to the compensation at replacement cost of their houses, lands and other properties.Full compensation and allowance must be provided to affected households prior to the taking of affected land and assets. - Additional efforts, such as economic recovery assistance, training and other forms of assistance, should be provided to PAPs losing income sources, especially to vulnerable groups, in order to enhance their future prospects toward livelihood restoration and improvement. - As RAP is one of the project components, the project will not be considered complete until the RAP has been fully implemented and met OP 4.12 policy objective. 6.3. Compensation, assistance and resettlement policies 6.3.1. Compensation policy for agricultural land For land users entitled to the compensation (legal and localizable land users) - If PAPs’ acquired area is less than 20% (10% for the vulnerable) of their total productive land and the remaining area is economically viable according to threshold identified in each province resettlement policy, PAPs will be compensated by cash at 100% replacement cost for the acquired area and provided allowance for job training/creation as regulation of the government. - If PAPs have loss of 20% or more (10% or more for the vulnerable) of their total arable land holding, PAPs will be compensated by cash at 100% of the replacement cost and received income rehabilitation measures such in item 6.3.8 below. For land users with no legal rights or claim on land - PAPs whose affected land used before 01 July 2004 will be compensated in cash for the land at 100% replacement cost as regulated in the item 2, article 77 of the Land Law; - PAPs whose affected land used after 01 July 2004 will be assisted in cash for livelihood restoration with amount of not less than 60% of the land compensation value at the replacement cost and will be entitled to participate in livelihood restoration programs. For land users leasing pulic land - PAPs who use public land (or reserves) with a previous agreement on returning the land to the Government whenever it requests will not be compensated for land lost, but compensated for crops, trees, and other assets on land in cash at the replacement cost, and compensated for the remaining investment in the affected land as regulated in Article 3 and Article 5 of Decree No. 47/2014/ND-CP. - Where PAPs lease land on the basis of leasing contracts with individuals, households or organizations other than those specified above they shall only receive compensation for Page 36 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province the remaining investment value on land and assets created on land before the cut-off date at full replacement cost. Compensation payments for land will be made for owner of the affected land 6.3.2. Compensation for residential land 82. Users whose residential land is acquired will be compensated as follows: Residential land without structures thereon - For legal and/or legalizable land users, all compensation for loss of land will be made in cash at 100% replacement cost; - For land users who have no recognizable land use right, no compensation for land but compensation for the remained investment in the land based on current market price and financial assistance equal to 30% of land compensation value and other assistances according to decision of the PPC will be provided. Loss of residential land with structures built thereon, where the remaining (non-acquired) land is adequate to rebuild the structure (reorganizing PAP): - For legal and legalizable land users: Compensation for loss of land and structures will be made in cash at 100% replacement cost; - For illegal and unlegalizable land users: No compensation for affected land but compensation for affected assets at replacement cost and a minimum assistance of 30% of land value at replacement cost. - In case the remaining land is not large enough to rebuild a house, but there is garden land or agricultural land adjacent with the affected land, PAP allows converting part of garden/agricultural land into residential land with exemption from conversion fee to be able to rebuild house. Loss of residential land with structures built thereon, and the remaining land is not adequate to rebuild the structure (relocating PAPs) - PAP with legal and/or legalizable rights to the affected land, can choose one of the following options: o Affected households can opt: (i) receive cash compensation and resettlement allowance at replacement cost and self-relocate; or (ii) receive plot/apartment in resettlement site and resettlement allowance; o In case, PAPs losing residential land and their remaining land is not viable enough for their residence, the state will acquire the remaining land and compensate cash or land plot in the resettlement area; or convert adjacent agriculture land (if land available) to residential land. o In case the compensation in cash for affected land is not enough for buying a minimum land plot in the resettlement area, the State will add up for the difference. - PAP, who do not have legal or legalizable rights to the affected land, are entitled to the following: Page 37 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province o Get a minimum assistance amount of 30% of land value at replacement cost o If the PAP has no other land within project commune to relocate, a minimum land plot or an apartment in resettlement site will be provided and they can either pay in installment for land use fee or for rent of the apartment. o In case the relocated PAPs belong to poor or vulnerable groups or households, special assistance (in cash and kind) will be provided to ensure that they are able to fully relocate to a new site. PPCs will consider the rate of assistance for these households 6.3.3. Compensation for house and structure PAPs with affected house/structure will be compensated as follows: o Entirely affected house/structure: Compensation in cash for all affected house/structure with 100% replacement costs if the affected house/structure were constructed before the cut-off date3. The compensation amount is enough to rebuild the new house/structure with similar technical standard of the affected house/structure without depreciation and deduction of salvageable materials. For illegally constructed structures, if household was announced or prevented by local authorities at time of construction due to violation with the local government regulation/planning but households has not followed, policy of the local government will apply. o For partly dismantled house/structure and remaining part is viable for use: compensation for affected part at replacement cost without depreciation and deduction of salvageable materials and costs for reparing the remaining part; - Tenants of state-owned or state organization-owned houses will be entitled to rent or buy a new plot/apartment of minimum area in resettlement site; or provided a financial assistance equivalent to 60% of replacement cost of the affected land and 60% of replacement cost of house for self-relocation. - Tenants who are leasing private houses for living purposes will be provided resettlement and transportation allowances for moving assets to their new residential areas. Compensation for moving graves - For relocation of graves: compensation for expenses excavation, backfilling, transportation, construction and other reasonable expenses directly related to removal of tobm. Ha Tinh Provincial People's Committee stipulates specific compensation levels suitable to local customs and practical status. If the local government can not arrange location for re-burial, affected households will be compensated for land as follows: o In the area of Ha Tinh city: 4,000,000 VND/grave o In districts: 2,000,000 VND/grave 6.3.4. Compensation for crop, trees and livestock - For annual and perennial standing crops cultivated before the cut-off date, regardless of 3 In case, at time of construction of structure, local authorities have announced household and/or prevented the construction and recorded by the minute but household has not followed, local government policy shall apply. If no minute recorded, the Bank policy will apply. Page 38 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province the legal status of the land, compensation will be paid to affected households at full replacement cost. For trees which have not been harvested yet but can be brought to another location, the transportation cost and the actual damage due to the transportation and re-planting must be compensated. - For livestock (including aquatic livestock) which cannot be harvested at time of land acquisition, PAPs will be compensated in cash at replacement cost at the time of land acquisition. In case the aquatic livestock can be brought to another location, the transportation cost and the damage caused by the transportation must be compensated. 6.3.5. Compensation for affected public assets - Public works and facilities affected by the project must be repaired or recovered as soon as possible to minimize adverse impacts on production and living conditions of communities in the project area at no cost to the communities. 6.3.6. Compensation for temporary impacts during construction phase - Temporary impact often happen on land not on structure. If impact on crops/trees or structures, compensation for affected standing crops/trees or structure at replacement cost and income lost during temporary land use period. Restore land to pre-project condition before returning to AHs. 6.3.7. Compensation for transportation of assets - Households and individuals who have to relocate shall be entitled to compensation for expenses for relocation of the property as follows. o Transportation distance not over 1km: 2,600,000 VND/household; o Transportation distance within 1km to 5km: 4,000,000 VND/household; o Transportation distance within 5km to 10km: VND 6,000,000/household; o Transportation distance over 10 km to 15 km: 8,500,000 VND/household o Transportation distance over 15km: 12,000,000VND/household 6.3.8. Assistance for income restoration and life subsistence 83. In addition to direct compensation for damaged assets, AHs are assisted to recover their income and stabilize their lives during the transition period. Assistance for subsistence and production stabilization: - PAPs losing 20% to 70% (10% to 70% for vulnerable households) of the agricultural land will be assisted for 6 months (if not displaced) and for 12 months (if displaced); - PAPs losing over 70% of the agricultural land shall be assisted for a period of 12 months (if not displaced) and 24 months (if displaced); The assistance level for an affected person is calculated in cash equivalent to 30kg of rice per month per person at the average price at the time of assistance. Assistance for resettlement: - PAPs being displaced when the State recovers residential land of which the acquired land area is 200 m2 or more for urban areas, 300 m2 or more for rural areas in plain communes, 400m2 or more for rural areas in mountainous commune will get resettlement assistance of 100,000,000 VND/HH and VND50,000,000/HH for other Page 39 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province cases; - PAPs being displaced and having no other place to live during period of establisng new residence will be assisted with house rent or temporary dwelling, with assistance of 800,000 VND/household/month for rural area, 1.2 million VND/household/month for urban area.. The assistance period is practical but not over 6 months since land handed over to the project. In case, plot in resettlement site is not allocated to AH on time, AH will be provided house rent until they have received plot. Households will get this assistance in cash after handing over land to the project in accordance with regulations; - Households and individuals renting non-state houses are displaced when the land is recovered by the State shall be entitled to the assistance for transportation of property and assets at the rate of 2,000,000 VND/HH. Assistance for vocational training and employment introduction: - Assitance for vocational training and career change for affected households who are directly cultivating on the affected agricultural land (certified by the local government), will be in cash equal to 1.5 to 5 times of compensation value of the affected land area but not exceeding VND 130,000,000/household; - Beside of above assistances, if members (at the working age) of affected households, including the displaced business households want to have vocational training and employment introduction they will be provided one free of charge training course at vocational training centers in the province (not applied for vocational training outside the province) Assistance for social policy families and vulnerable households: - Households with 02 members as martyrs, households taking care of Vietnamese heroic mothers (still alive), households with at least one war invalids of 1/4 grade and sick soldiers of 1/4 grade shall receive an assistance of 3,000,000VND/household. - Households with 01 member as marty, at least 1 war invalid of 2/4 grade, sick soldiers of grade 2/4, and agent Orange beneficiaries shall receive VND 2,500,000/household; - Households with war invalids of 3/4 or 4/4 grade, sick soldiers of 3/4 or 4/4 grade, families with contribution to the revolution, the elderly, the single household head, long- term sick, poor households and women headed household with dependents will get assistance of 2,000,000 VND/household. Incentive bonus for handing over the affected land as scheduled: - Households and individuals who have to relocate and removal of graves 15 days prior to the notice to hand over the affected land to the project, shall get an incentive bonus of 5,000,000 VND per household (for displacement of houses/structure) and 500,000 VND/grave (for displacement of grave). Page 40 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Table 14: Entitlement Matrix No. Type of loss Affected level Type of PAPs Compensation/assistance policies Implementation A Land A.1 Losing from 20% (10 - PAPs will be compensated in cash at Affected households to be % for vulnerable replacement cost for the acquired area; and notified at least 90 days before households) or more of - PAPs will be entitled to take part in the project land recovery by the Project. agricultural land income restoration program. Compensation and allowance to be paid one time. PAPs are eligible Independent appraiser determines for compensation replacement costs for all types of land and non-land assets for compensation. Losing less than 20% - PAPs will be compensated in cash at PPC decided allowance level agricultural land (10% replacement cost for the acquired area; and for vulnerable - Allowance for vocational training/job creation Agricultural land households) In lieu of compensation for - PAPs whose affected land used before 01 July illegal land they occupy, 2004 will be compensated in cash at replacement displaced persons should be cost. assisted in their efforts to - PAPs whose affected land used after 01 July improve their livelihoods and Land users are not 2004 to before the cut-off date will be assisted in standards of living or at least entitled cash for livelihood restoration not less than 60% of to restore them, in real terms, the land compensation value at the replacement to pre-displacement levels or cost. to levels prevailing prior to - The supported/compensated land areas are the beginning of project within the land allocation quotas under Article implementation, whichever is 129, Land Law 2013. higher Land users with - No compensation for land, but compensation in Page 41 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province No. Type of loss Affected level Type of PAPs Compensation/assistance policies Implementation temporary or leased cash at replacement cost for non-land assets on the rights to affected land land if created before the cut-off date and remaining investment in the affected land at replacement cost at the time of acquisition according to Ha Tinh PPC’s decision. Households are not Affected households to be - Affected land-users will be compensated for the displaced actually affected area in cash at replacement cost. notified at least 180 days before land recovery by the Project. - Affected households can opt: (i) receive cash compensation and resettlement allowance at Allocation of land plots in the replacement cost and self-relocate; or (ii) receive resettlement area should plot/apartment in resettlement site and resettlement consider household’s allowance; demand; - In case, PAPs losing residential land and their Compensation and allowance to remaining land is not viable enough for their be paid one time before dis Residential land residence, the state will acquire the remaining land placement. A.2 Residential land eligible for and compensate cash or land plot in the Households are compensation resettlement area; or convert adjacent agriculture In the case of the remaining displaced land (if land available) to residential land. land is not large enough to - In case the compensation in cash for affected rebuild house, but there is land is not enough for buying a standard land plot pond/garden/agricultural land in the resettlement area, the State will add up for in the same or adjacency with the difference. the affected plot it could be - In case the compensation amount for affected converted into residential land is higher than the value of land plot/apartment land according to the compensation in the project’s resettlement site, the provisions of PPC to be able difference amount will be paid in cash to PAP. to rebuild house on site. Page 42 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province No. Type of loss Affected level Type of PAPs Compensation/assistance policies Implementation Households are not - No compensation for land but provision of displaced allowance depending on decision of the PPC. Residential land If PAP has to relocate and has - No compensation for land but PAPs will be ineligible for no other land or house within assisted in cash with an amount of at least 30% of 4 project commune/ward for Households are compensation land compensation value, and compensation at shelter, they will be allocated displaced replacement cost for affected non-land assets if a minimum plot in created before the project cut-off date; and resettlement site with land - Provision of resettlement allowance. use levy payment; B On-land property B.1 Housing/structur For houses/structures If affected house combined es being partly affected but - Compensation and assistance for the affected part with shop, then compensation the remaining area is will be made in cash at replacement cost without for interruption of business viable to be used depreciation and no deduction for recyclable will be made. materials; Compensation for - Compensation for expenses for reparing the house/structure is enough to Owners of affected build new house/structure house/structures remaining part. with similar technical created before the standard of the affected one. cut-off date For houses/structures In case, at time of being entirely or partly Compensation and resettlement assistance will be construction of structure, affected but the made in cash at replacement cost without local authorities have remaining area is not depreciation and no deduction for recyclable announced household and/or viable to be used materials; and transportation allowance as below: prevented the construction o Transportation distance not over 1km: and recorded by the minute but household has not 4 Ineligible residential land is the land that forms from people's encroachment, with no land use right certificate and legal document. Page 43 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province No. Type of loss Affected level Type of PAPs Compensation/assistance policies Implementation 2,600,000 VND/household; followed, local government o Transportation distance within 1km to policy will apply. If no 5km: 4,000,000 VND/household; minute recorded, the Bank o Transportation distance within 5km to policy will apply 10km: VND 6,000,000/household; o Transportation distance over 10 km to 15 km: 8,500,000 VND/household o Transportation distance over 15km: 12,000,000VND/household Removal of tomb is Compensation for the removal of graves/tombs will customelly implemented at include the cost of land, excavation, relocation, the end of lunar calendar reburial and other related costs, which is relevant to customary requirements. The removal option and compensation will be decided in consultation with the affected families/communities and based on Ha Tinh Provincial People's Committee regulation. Grave having owner If there is no available land in the graveyard of B.2 commune/ward for relocation of affected Grave Grave to be displaced households’ grave, the affected households will be compensated with cash for their land self- arrangement as follows: o In the area of Ha Tinh city: 4,000,000 VND/grave In districts: 2,000,000 VND/grave - Compensation in cash will be allocated to Grave with ward/commune PC for covering the cost of ownerless removal and reburial at new place in planned cemetary. Page 44 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province No. Type of loss Affected level Type of PAPs Compensation/assistance policies Implementation Crops, trees and Being affected Regardless legal - Cash compensation at full replacement cost for - Affected households will domestic animals status of the land the affected crops/trees/ domestic animals be notified 30 days to hand planted/raised on the affected land if they cannot over land from after date be harvested/moved at time of land acquisition; compensated B.3 - Where affected crops/trees/animals can be Any vegetation, crops harvested/moved to new places, compensation will determination after the cut- be paid for the loss of the trees/animals (if any) off date will not be plus the transportation cost. compensated C Assistance - PAPs losing 20% to 70% (10% to 70% for Price of rice is market price at vulnerable households) of the agricultural land will time of compensation. be assisted is cash equivalent to value of 30kg of rice/month/person for 6 months (if not displaced) Regardless legal and for 12 months (if displaced)); Assistance for life Severely affected status of land - For cases of losing over 70% of the agricultural C.1 subsistence households land, PAPs shall be assisted in cash equivalent to value of 30kg of rice/month/person for a period of 12 months (if not displaced) and 24 months (if displaced); PAPs who directly cultivate on the affected agricultural land (confirmed by WPCs) will be assisted for job training and job creation with an Assistance for amount of equal 1.5 to 05 times of the acquired All affected C.2 vocational training Losing productive land land value according to regulation of the PPC; and households and career change Beside of above allowance, if PAP within working age wants to take vocational training, they will be admitted to a vocational center within the city with the exemption from tuition fees (not applicable for Page 45 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province No. Type of loss Affected level Type of PAPs Compensation/assistance policies Implementation those who enroll for vocational trainings outside the city). - PAPs being displaced when the State recovers residential land of which the acquired land area is Displaced 200 m2 or more for urban areas, 300 m2 or more Assistance for Losing residential land households for rural areas in plain communes, 400m2 or more C.3 resettlement and being relocated for rural areas in mountainous commune will get assistance of 100,000,000 VND/HH - Allowance of VND50,000,000/HH for other cases; C.4. PAPs being displaced and having no other place In case, land plot in for dwelling will be assisted house rental for resettlement site is not temporary dwelling as follows: allocated to AH after the AH Displaced Assistance for - 800,000 VND/household/month for rural area, has handed over land to the Losing residential land households and temporary - 1.2 million VND/household/month for urban project, house rent allowance and house need to temporarily dwelling area. The assistance period is practical but not over will be provided until AH has dwell 6 months. received plot, plus rental for 6 months for constructing new house. C.5 - Households with 02 members as martyrs, households taking care of Vietnamese heroic mothers (still alive), households with at least one war invalids of 1/4 grade and sick soldiers of 1/4 grade shall receive an assistance of Additional assistance 3,000,000VND/household. Social assistance Affected household for vulnerable group - Households with 01 member as marty, at least 1 war invalid of 2/4 grade, sick soldiers of grade 2/4, and agent Orange beneficiaries shall receive VND 2,500,000/household; - Households with war invalids of 3/4 or 4/4 grade, sick soldiers of 3/4 or 4/4 grade, families Page 46 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province No. Type of loss Affected level Type of PAPs Compensation/assistance policies Implementation with contribution to the revolution, the elderly, the single household head, long-term sick, poor households and women headed household with dependents will get assistance of 2,000,000 VND/household. C.6 Households and individuals that have to relocate and graves if complete relocation 15 days prior to Households with Displaced the notice, shall get an incentive bonus of Incentive bonus removed houses/grave household - 5,000,000 VND per household (for displacement of houses/structure) and - 500,000 VND/grave (for displacement of grave). D TEMPORARY IMPACTS DURING CONSTRUCTION D1 Temporary loss of Owners/users are Restore land to pre-project Temporary loss of temporally affected No compensation for land but compensation for condition before returning to land during land land non-land assets at replacement cost and income lost PAP construction during occupying period. D2 Damages caused by Land owners/users  Damaged property will be restored to its former  In case of impacts on contractors to private are affected condition or if impossible restoration, business of PAPs, the or public structures compensated for damaged properties by contractors have to agree contractors as soon as possible following policy with the households on Impact arising of the RAP. payment for disruption of from the business. construction Under their contract terms and conditions, the contractors will be required to take extreme care to avoid damaging property during their construction activities. Page 47 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Page 48 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province PART 7. INCOME RESTORATION PROGRAM 7.1. Objective 84. The objective of the program is to help AHs, especially severely affected households recover their income and restore their lives at least equal to or greater than before the project. 7.2. Program’s subjects 85. Participants in the income restoration program are severely affected households who (i) losing 20% or more of the existing agricultural land (10% for households in vulnerable groups); (ii) having to relocate; (iii) losing business. Results of IOL show that there are 91 households eligible to participate in the income restoration program, of which 77 are severely affected by loss of productive land; 14 households have to relocate. 7.3. Income restoration program’s activities 86. The program is developed based on the needs assessment of eligible households and result of working with service providers in in Ky Anh Town and Ha Tinh province. Activity 1: Vocational training 87. At present, in Ky Anh Town, there are several vocational training centers that can provide different vocational training services for local people such as Vocational Training Center and Frequent education Center of Ky Anh town, and Vung Ang vocational training college of Ha Tinh province. 88. A rapid assessment of need was conducted by the consultant shows that 71 PAPs registered for tranining courses with tuition fees and duration of training as listed in table 14. During project implementation, the Compensation and site Clearance Committee and the Project Management Unit will conduct a need assessment of PAPs for tranining, then prepare training plan and collaborate with Department of Labor, Invalids and Social Affairs and training Centers to implement the vocational training courses for PAPs. Table 15: Training courses (Currency: VNĐ) Lunch and Training time Tuition Training course travel (month) fee/course allowance Mushroom cultivation technique 1 2,000,000 Veterinary medicine 3 7,000,000 Livestock and poultry breeding 3 7,000,000 Agricultural machinery operation and 50,000 3 9,000,000 repair VND/person/day Industrial electricity 3 9,000,000 Mechanical welding 3 9,000,000 Industrial garment 3 7,000,000 Page 49 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province 89. After completing training courses, trainees will be introduced to work at factories in Vung Ang and Formosa industrial zones. Activity 2: Loan support 90. From the preliminary survey, 71 households wish to be supported in getting credit loan for business development. At present, there are 3 main credit programs in Ky Anh town provided by Viet Nam Agriculture and Rural development Bank and Social Policy Bank, including credit for poor households, credit for students/pupil and credit program for social policy households. 91. Approach to bank’s preferential credits: - Affected people who want to borrow bank loans (VBARD or VBSP) will be invited to attend a 1-day workshop to get information and discuss on how to access to and use effectively credits. The PMU will work with the banks to prepare documents for disserminating full information to PAPs, including all information on banking services and how to approach these credit sources... This document will be updated at any time if necessary. Affected people can obtain this material at the Ward People's Committee, the community house/cultural house, the Bank offices and the PMU office. - The PMU in combination with the banks will be responsible for organizing the workshop and will be responsible for providing information to PAPs who wish to borrow. Activity 3: Job creation and introduction 92. The construction contractors for this project must prioritize the recruitment of local labor that meets the work’s requirements. If affected persons want to work for the project, they can directly apply for jobs with contractors or the PMU will help recruit laborers of affected households for contractors. The PMU will negotiate with construction contractors to provide appropriate employment for PAPs who want a job in the project. 93. During the project implementation, PMU staff (or consultants hired by the PMU) will monitor the livelihood restoration program, liase regularly with representatives of the contractor, identify the recruitment needs and inform job chances for affected households that are searching for employment. 7.4. Executive agency 94. Organization and responsibility of the executive agency for the income restoration program implementation include: - Ha Tinh Provincial People’s Committee: Responsible for directing, reviewing and approving the program; - Ky Anh town People’s Committee: Responsible for overall management and control the program implementation and report to Ha Tinh PPC; - Department of Labor, Invalids and Social Affairs: Responsible for regular monitoring of the income restoration program and reviewing the program content; Page 50 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province - Department of Agriculture and Rural Development, the vocational schools/training and job introduction centers, Vietnam Bank for Agriculture and Rural Development, Social policy bank: Responsible for supporting the training, vocational training, providing credit for affected households to start/continue their production. - Social political unions (Farmer Association, Women’s Union, Veterans Association and the Youth Union): Responsible for supporting PAPs to effectively participate in the income restoration program; - Ky Anh town PC directs the PMU, Compensation and Resettlement Committee and other related agencies with support from the Consultant to prepare and implement the income restoration program. - The independent monitoring consultant is responsible for periodically monitoring implementation of the program and recommending solutions for any pending issues which may occur during the implementation process; - The project management Unit (PMU) is responsible for implementing and reporting progress of the program implementation to Ky Anh town PC, Ha Tinh PPC and the World Bank. 7.5. Budget for program implementation 95. Estimated budget for implementation of the Income restoration program is about 828,450,000 VND including: training cost, workshop, management cost, monitoring and evaluating cost with detailed in table 16. This budget will be updated at time of resettlement implementation. Table 16: Budget for program implementation Activity Unit Quanty Unit price Amount Vocational training People 71 9,000,000 639,000,000 Capital access workshop Workshop 5 30,000,000 150,000,000 Contingency cost (5%) 1 41,000,000 39,450,000 Total 828,450,000 96. Budget for implementation of the income restoration program is taken from counterpart fund of Ky Anh town and will be updated at time of the implementation. 7.6. Implementation plan 97. The income restoration program expects to be implemented after completing the compensation for affected households. Tentative chedule and activities are summaried in following table and will be updated at time of resettlement implementation: Page 51 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Table 17: Tentative schedule for implementation of the income restoration program Schedule Hoạt đông 2020 2021 2022 2023 2024 2025 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Updating suppo't demand Worshop on credit program Vocational training Monitoring & evluating 7.7. Monitoring and evaluation 98. The income restoration program (IRP) will be regularly monitored by the PMU and the independent monitoring and evaluation consultants every 6 months from the commencement until the end of the program. The objective of monitoring and evaluation is to examine the effective implementation of program activities in order to promptly adjust the proposed activities to meet the program's objectives. The content of monitoring and evaluation will be included in TOR for the independent monitoring consultant. PART 8: RESETTLEMENT ARRANGEMENT 8.1. Resettlement options 99. There are three options for resettlement: (i) on-site resettlement (if remaining land area is enough for rebuilding house); (ii) relocation to resettlement site of the project; and (iii) self– relocation. 100. On-site Resettlement: The on-site resettlement option is applicable to households whose houses are partly or totally affected but the remaining area is sufficiently large to rebuild their houses. In cases where the AH’s remaining area is agricultural land that is located in a planned residential area of the city, they will be converted into residential land for resident. 101. Self-relocation: This resettlement option is offered to households who have to relocate and want to self-relocate to other sites. These households receive cash compensation and allowances for self – relocation. In this case, the affected households, in addition to receiving compensation at replacement cost, are supported with an amount of 100 million VND/HH (for the acquired land area from 200 m2 in urban area, 300m2 in rural area and plain commune and from 400 m2 for households in mountainous communes) based on Ha Tinh Provincial PC regulation. Other cases will get assistance of 50 million VND/HH. 102. Resettlement at resettlement area: Households who have to relocate and chose to move in resettlement site will be allocated land plot in the resettlement site of the project. The resettlement area will be constructed with full technical infrastructure to ensure that affected households will get better living condition or at least equal to their old place. 8.2. Construction of resettlement area Page 52 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province 8.2.1. Evaluation on the project’s resettlement demand 103. According to preliminary survey, 14 households will be displaced and require resettlement, of which 12 households select relocation in project’s resettlement areas and 2 households select self-relocation. 8.2.2. Public consultation on resettlement area 104. Public consultation with the community and displaced households was conducted in 5 meetings at 5 wards/communes from 16 August to 30 August 2017. Two resettlement areas were proposed for the project and all relocated households satisfy with the proposed resettlement areas. Following table summarize information of the areas and opinions of relocated households on the proposed resettlement sites. 105. Ky Hung and Ky Trinh resettlement areas are available resettlement areas which have been constructed with full infrastructure. These two areas are close to old residential areas of the affected households so they will not be affected much in livelihood and access to education, healthcare and market. Table 18: Analyzing options for resettlement areas Proposed sites Opinion of relocated households Cau Bau area: in Tan Ha hamlet, Ky - This area is planned for construction of Hung commune resettlement site - Area: 2.87ha, including 72 land plots. - Location: It is located in the center of Ky Hung commune, near the commune people’s committee - Investor: Ky Hung commune people’s office, Health station and cultural house and committee school. - Minimum land plot area: 250m2 Ky Trinh resettlement area: in Quyen - The resettlement area is well equipped with Hanh residential group, Ky Trinh ward technical infrastructure system connecting with the - Area: 15ha main urban road and the urban center. - Location: convenient for people to approach to - Investor: Ha Tinh Provincial social services like medical service, education; Economic zone - Distance from the resettlement area to people’s - Minimum land plot area: 200m2 existing place: not very far, so people can quickly adapt to new life, many people can continue their old livelihood without having to change spouse’s school and medical facility 8.2.3. Granting of land use right certificate 106. As stipulated by Viet Nam’s regulation, households being allocated land plots in the resettlement areas under Ky Anh town project, the town people’s committee will grant land use right certificate. The land use right certificate is the legal document confirming people’s legal ownership of land under the new Law on Land 2013. Page 53 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province PART 9: COMMUNITY PARTICIPATION AND PUBLIC CONSULTATION 9.1. Objectives of information dissermination and public consultation 107. Information dissemination and public consultation are important activities of the project with following objectives: - Ensure that the community is well known about the project information; - Help the community understand the project’s importance in the local socio-economic development, create a high consensus of the community on the project; reduce the possible conflicts and minimize the risk of project delays; - Prepare plan for resettlement, compensation and assistance to meet the needs of AHs, maximize benefits of the project. 9.2. Participation and consultation procedure 9.2.1. Public consultation during project preparation Methods of implementation: 108. Information dissemination and public consultation methods include rapid assessment with involvement and consultation of stakeholders, using site-based techniques and household meetings and site visits, public meetings, focus group discussions, and socio-economic surveys. Consultation content: 109. The consultation focused on the following main contents: (i) project’s proposed components, including objectives and proposed work items; (ii) General information on the policy framework that will be used for compensation, assistance and site clearance; (iii) public consultation on community needs for improving local infrastructure and community awareness on the project objectives; (iv) community feedback on proposed mitigation measures. Consultation results: 110. Consultant of Resettlement Action Plan Preparation organized public consultation from 16 to 30 August 2017 in the project wards/communes and 5 meetings were organized with 102 participants. 111. Public consultation in the preparation phase helps form and strengthen community consensus with the project. A summary of the public consultations and dissemination of information is presented in the following table: Page 54 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Date/Month Location Participant Numbe of Information participants Total Male Female Disclosed information Feedbacks of participants - Local - General information - Local authorities and local people totally agree authority's about the project; with the project and support for the project representative - Project implementation because it will facilitate local socio-economic - PMU's plan; development, create an environmental 20h -22h Ky Hoa representative - Introduction on the landscape, improve living conditions; 20 18 2 16 August CPC - Consultant's project’s compensation - Compensation policy should be transparent representative policy framework, and fair to all households; - Affected compensation - Households wish to change land use purpose household principles and articles; of garden and perennial land into residential - Project’s livelihood land restoration program of - Local authorities and local people totally agree the project; and wish that the project will soon be - Preliminary survey implemented; results, preliminary - There is no objection to the State’s 14h-16h Song Tri inventory of loesses; Compensation policies but public consultation 14 12 2 17 August WPC - Discussion with should be done thoroughly to get high affected people concensus on compensation before commencing the land acquisition; - The project construction should be quick and meet the schedule 14h 30– Ky Hung - Public consultation should be carried out well 48 27 21 16h30 WPC in all stages of the project; Page 55 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Date/Month Location Participant Numbe of Information participants Total Male Female Disclosed information Feedbacks of participants 18 August - Compensation should be reasonable; - Households should be well noted before commencing the land acquisition; - Displaced households should be provided with new residential places near their old residence. - Local government and people agree on the project implementation and will closely cooperate with the PMU to ensure scheduled project implementation. 8h-10h Ky Trinh - There is no disputes on land in the project area, 11 9 2 29 August WPC so this will be a favourable condition for the project implementation. - Construction time should be notified to people and compensation should be completed before construction. - The project will bring many benefits to local people so all of people wish that the project will soon be implemented; 14h-16h Ky Hung 20 12 8 - The project should avoid sensitive areas such 30 August CPC as church, ancestral house… - All households should be consulted before land acquition Page 56 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province 9.2.2. Public consultation during project implementation stage 112. As requested by the World Bank, the resettlement action plan in Vietnamese language will be disclosed publicly at the PMU office, the town people's committee and the relevant wards/communes before and after being approved by the the WB and PPC. The English version will be sent to the World Bank for disclosure on the Bank’s website prior to project appraisal. a. Consultation and Information dissemination 113. During the project implementation, the PMU, with the support of the Consultant, will undertake the following tasks: - Provide information for the town’s Compensation, Assistance and Resettlement Committee (CARC) and local government at all levels through workshops, and training, including detailed information on project policies and implementation procedures. - Coordinate with the town’s CARC/Land Fund Development Center (LFDC) to organize information dissemination and consultations for all affected persons during the project’s implementation. - Coordinate with the CARC/LFDC to update compensation unit costs and reaffirm the scale of land acquisition and impact on assets based on the detailed measurement survey (DMS) and conduct consultations with the affected persons. - After completetion of compensation plan preparation for affected households, the PMU/ CARC/LFDC will publicize of the plan through meeting with affected persons and send a copy of the plan to them for comment. The compensation plans will be also posted at the ward people's committees. - Send dispatches or questionnaires concerning resettlement action plans to all displaced persons to (a) inform them of the resettlement action plans (clearly explain the characteristics of each plan), (b) request affected persons to confirm their choice for resettlement b. Consultation content 114. During the detailed design stage, the community meetings will be held to provide additional information to the affected persons and provide opportunities for them to participate in the more detailed, open discussions about the detailed design, policies and procedures for resettlement. This information will be publicized through the mass media (such as newspapers, radios, posters, ward people's committees in the project area). The affected persons must be provided with the following information: - Project items: This includes information on the proposed works to be constructed and their benefits to people. - Project impacts: Impacts on people who live and work in the project affected area, including implementation of land acquisition demand for each specific work items of the project. Page 57 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province - The rights and compensation entitlements of the affected persons: Explain clearly with the affected persons the rights and compensation entitlements for different types of impacts. - The grievance redress mechanism: The affected persons will be informed of the compensation, support and resettlement policy and livelihood restoration programs. The affected persons will be informed if they have any concerns/questions related to the project compensation, resettlement and livelihood restoration, the CARC/LFDC and the competent authorities shall consider settling their concerns/questions. The affected persons will have access to the grievance redress procedures. - The rights to participation and consultations: The affected persons will be notified of the rights to participate in the resettlement action planning and implementation. The affected persons are represented at the CARC and their representatives will be present when the CARC organize meetings to ensure their participation in the project sectors. - Resettlement activities: All households affected by the project will be explained on the compensation calculations and compensation payment, monitoring procedures, and resettlement site. - Responsibilities for organization: The affected persons will be informed about the the executing arency and implementation agencies and levels of authorities relating to the resettlement and the responsibilities of each party. - Implementation progress: Affected households will be informed about the progress of the resettlement activities. It should specify that the affected persons will move only when they received full payment of compensation and allowances for their lost properties. 9.2.3. Public dissemination As per the Bank’s requirement (OP 4.12, paragraph 29), the draft RAP were disclosed in Vietnamese at the local level at the website and office of the PMU, District PC, Ward PCs and in English at the World Bank Info Shop in Washington D.C. After approval by the GoV and clearance by the WB, the final RAP will also be disclosed as per the draft RAP. For any changes to the RAP it will be cleared in the same way and re-disclosed. PART 10: GRIEVANCE REDRESS 10.1. Grievance redress responsibility 115. To ensure all complaints from affected people regarding land acquisition, compensation and resettlement…are resolved timely and reasonably, one grievance redress mechanism was be proposed in this Resettlement Action Plan. All affected people can send their complaints and querries on their entitlements, compensation price, support, income restoration. to the implementing agency without paying any cost during the resolution of these complaints at all levels. The grievance redress mechanism follows the Law on Complaints No. 02/11/QH13 and regulations on complaints in Decree 75/2012/ND-CP dated 20/11/2012. The complaints will be resolved through 3 levels before going to the Court as the final resolution. 10.2. Grievance redress mechanism 116. Steps for raising complaints and complaint settlement as follows: Page 58 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province First Stage: At the ward/commune/Township People's Committee (W/C/T PC) 117. PAP may submit their complaint – either in written or verbal, to the One Stop Shop (OSS) of the Ward People’s Committee. A member of the One Stop Shop will receive the complaints and will notify the C/WPC leaders of the complaint. The Chairman of the C/WPC will meet the complainant in person and will solve it within 15 days following the receipt of the complaint. Second Stage – District/Town People’s Committee (DPC) 118. After 15 days since the submission of the complaints, if the aggrieved person does not have any response from the OSS of the C/WPC, or if the aggrieved person is not satisfied with the decision taken on his/her complaint, the complainant may take the case, either in written or verbal, to the OSS of District People’s Committee. The District People’s Committee will have 30 days since the date of receipt of the complaint to resolve the case. The District People’s Committee will record all the complaints submitted and will inform the District Compensation and Resettlement Board of the District PC’s resolution/assessment results. Aggrieved person may elevate the case to the Courts of Law if they wish. Third Stage - Province People's Committee (PPC) 119. After 30 days, if the aggrieved PAP does not hear from the District PC, or if the PAP is not satisfied with the decision taken on his/her complaint, the PAP may escalate the case, either in writing or verbal, Provincial People’s Committee, or lodge an administrative case with the District People’s Court for resolution. The PPC will have 45 days to resolve the complaint to the satisfaction of all the concerned. The PPC secretariat is also responsible for registering all complaints that are submitted. Complainant may elevate the case to the Courts of Law if they wish. Final Stage: At the court 120. If after 45 days the affected persons have received no feedback from Provincial PC, or not satisfied with the decision being made for his/her complaints, the case can be submitted to the Court to be considered. The court's decision will be final. 121. Decision on solving the complaints must be sent to the aggrieved PAPs and concerned parties and must be posted at the office of the People’s Committee where the complaint is resolved. The decision/result on resolution is available at commune/ward level after 3 days, and at City level after 7 days. PART 11: INSTITUTIONAL RESPONSIBILITY 122. Ha Tinh Provincial People’s Committee with the role of the project’s executive agency will be responsible for resettlement activities within its administration. The main responsibilities of Ha Tinh PPC as follows: - Appraising and approving Resettlement Action Plan; Page 59 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province - Making decision approving the land price for compensation, assistance and other allowances for the affected people, particularly for the vulnerable group..based on the RAP’s principle; - Timely arranging budget for compensation, assistance and resettlement; - Directly monitoring related Departments in implementing the RAP in an effective manner; - Authorizing district People’s Committee to approve the plan for compensation, assistance and resettlement; - Directing related agencies in resolving complaints related to compensation, assistance and resettlement under its legal administration; - Directing related agencies in checking, monitoring and solving any violations in compensation, assistance and resettlement. 123. Ha Tinh Department of Planning and Investment is authorized to take following responsibilities: - Being one member in the Board in charge of project preparation; - Advising and approving proposed work items before submitting to the PPC; - Collaborating with related Departments and the PMU during the implementation of the RAP. 124. Ky Anh town People’s Committee takes following responsibilities: - Directing, organizing, propagating and mobilizing all concerned organizations, households and individuals to abide by the compensation, assistance and resettlement policies and carry out site clearance according to the competent authorities’ regulation. - Directing the CARC to elaborate, appraise and approve the compensation, assistance and resettlement action plan as decentralized by the provincial People's Committee; And co- ordinating the implementation of site clearance, compensation, assistance and resettlement action plan prepared by the Land Fund Development Center and Ha Tinh Department of Natural Resources and Environment. - Appraising and confirming the extract of land origin prepared by Commune/Ward People's Committee - Collaborating with related departments, agencies and organizations and PMU for investment preparation and construction of resettlement area as directed by PPC. - Resolving petitions, complaints and denunciations of citizens relating to compensation, assistance and resettlement within their competence; Making decision on involuntary site clearance and land acquisition under its competence or authorized by provincial People's Committee 125. The Ky Anh CARC is the agency assisting the town People's Committee in organizing the implementation of compensation, assistance and resettlement. The Committee is established by the town People's Committee and is responsible for: - Conducting DMS Page 60 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province - Making plan for compensation, assistance and resettlement and submitting to competent authorities for approval; Organizing the implementation of approved compensation and assistance plan; - Sharing with the team’s members all responsibilities for the accuracy and legality of the compensation and assistance beneficiary, land origin, inventory data, legal status of on-land assets; Determining the conditions for compensation or assistance for the affected property; - Resolving the recommendations of the compensated and assisted persons on issues related to compensation, assistance and resettlement action plan and submit them to the town People's Committee for settlement of matters beyond their competence; - Directing local officials and administrations to implement the compensation, assistance and resettlement action plan; - Collaborating with the Land Fund Development Center (under the Department of Natural Resources and Environment) to make compensation, assistance and resettlement. 126. The Project Management Unit is the agency that assists the project Owner (Ky Anh town People's Committee) and will take direct responsibility for the Project management. The PMU will be responsible for implementing the Project Resettlement Action Plan including: - Preparing the RAP or updating the resettlement action plan and submitting to PPC for approval; - Preparing resettlement site for arrangement and relocation of displaced households before land acquisition; - Participating in the CARC; Providing all necessary information related to the project and the plan of compensation and assistance supporting the CARC’s appraisal; - Guiding the implementation of the OP.4.12 and RAP’s policies; - Planning the implementation of the internal monitoring on project’s resettlement activities and following policies of the project; - Preparing detailed plan for site clearance and resettlement; Signing contracts with relevant agencies for compensation, assistance and resettlement; - Selecting, monitoring and reviewing the recommendations of the independent monitoring agency; - Accepting the handover of the site and assigning construction units; - Making periodical reports on resettlement activities to the World Bank. 127. Ward/commune People’s Committee is responsible for - Disserminating information on the purpose of land acquisition, policies on compensation, assistance and resettlement of the project for people whose land is recovered; - Coordinating with organizations in charge of implementing compensation, assistance and resettlement to guide people whose land is recovered to declare and certify the results of inventory of land and on-land assets; - Confirming the legality of the land origin, demographics, household registration, social policy and proposing resettlement for the person whose land is recovered; Page 61 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province - Facilitating site clearance for project implementation. PART 12: IMPLEMENTATION PLAN 128. The process and procedures for compensation and resettlement is based on Land Law 2013 No 45/2011/QH13 dated November 29, 2013, Decree No. 47/2014/ND-CP dated May 15, 2014, Circular No. 37/2014/TT-BTNMT dated June 30, 2014 of MONRE, Decision No. 75/2014/QD-UBND dated 03/11/2014 by Ha Tinh PPC regulating on compensation, assistance and resettlement when the State recovers land in Ha Tinh Province. The basic activities of the compensation and resettlement is carried out by following steps: i. Based on detailed technical design of works, the design consultants and PMUs hand over benchmarks of site clearance to DCRC to determine AHs and carry out DMS of affected assets. ii. Holding meetings with AHs to disseminate project information and principles of compensation and resettlement, including the project objectives and benefits, potential positive and negative impacts of the project, mitigation measures, and methods used to evaluate prices of affected assets restoration measures, and grievance redress mechanism. iii. Conduct detailed measurement survey (DMS) of affected HHs and their affected assets to collect information on PAPs, identifying quantities of affected assets. Consulting PAPs about mitigation measures for the project impacts and assistance measures for livelihood restoration. iv. Carrying out replacement cost survey. v. Preparing compensation plans, announcing compensation plans in public and consulting with PAPs to obtain their comments, finalizing compensation plans and submitting to DPCs for approval. vi. Paying compensation and allowances. vii. Implementing resettlement (if any) and site clearance after delivery of full compensation to PAPs. viii. Implement the income restoration program ix. Internal and external monitoring activities will be implemented during the whole process of compensation and resettlement implementation to ensure that the implementation of compensation and resettlement complies with RAP. Page 62 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Figure 4: Structure of organization implementing RAP Ha Tinh PPC Ky Anh CPC DPI Consultants HĐBTHT-TĐC eering Committee thị xã for the preparation and implementation PMU of projects CLFDC RAP implementing WPCs Measurements, compensation payment and resettlement APs : : Directing lines : Collaborating lines Page 63 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Table 19: Implementation schedule 2019 2020 2021 2020 2023 2024 2025 No Activity 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 Project preparation (basic design) 2 RP preparation for basic design phase 3 Submitting to WB approval 4 Detailed design and solution approval 5 Bencharking, site clearance 6 Updating and implementing RP as detailed desigs 7 Arranging resettlement areas 8 Implementing RP 9 Construction 10 Income restoration progra implemtation 11 Monitoring Continous activies Interval activities Page 64 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province PART 13: BUDGET ESTIMATION 13.1. Replacement cost survey 129. During the preparation of the Resettlement Action Plan, a rapid assessment on replacement cost was conducted based on market price for types of land and non-land assets including transactional fees like tax, levy, registration fee…The replacement cost survey was based on: - Decision No. 94/2014/QD-UBND dated 27/12/2014 by Ha Tinh Provincial People's Committee promulgating the unit price of land categories in the period 2015-2019. - Consultation with leaderships of local government and local community - Reference to unit price of some projects in the province - Real estate transaction market - Consultation with construction contractors on material and construction cost 130. Survey results show that, land price has not changed much from the price in the State's price list in 2014. For implementing projects in the provice, compensation and support for land acquisition still use the land price in the Decision No. 94/2014/QD-UBND dated 27/12/2014 by Ha Tinh PPC. 131. Results of the rapid replacement cost survey were applied for estimating the cost of RAP implementation. During the implementation process, the PMU will recruit an independent appraiser for appraising the replacement cost to apply for compensation for AHs of the project. Table 20: Results of replacement cost survey for land Price Proposed regulated by Adjustment No Type of land Ward/commune Unit replacement Ha Tinh coefficient cost PPC Sông Trí 2,500,000 1 2,500,000 Kỳ Trình VNĐ/m2 1,100,000 1 1,100,000 1 Residential land Kỳ Hoa 1,700,000 1 1,700,000 Kỳ Hưng 1,600,000 1 1,600,000 Kỳ Châu 1,800,000 1 1,800,000 Sông Trí 46,900 1 46,900 Kỳ Trình 45,100 1 45,100 VNĐ/m2 2 Annual crop land Kỳ Hoa 34,700 1 34,700 Kỳ Hưng 41,600 1 41,600 Kỳ Châu 34,700 1 34,700 Sông Trí VNĐ/m 2 51,600 1 51,600 3 Perenial crop land Kỳ Trình 49,500 1 49,500 Page 65 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Kỳ Hoa 38,100 1 38,100 Kỳ Hưng 45,700 1 45,700 Kỳ Châu 38,100 1 38,100 Sông Trí 23,400 1 23,400 Kỳ Trình 15,600 1 15,600 4 Pond land Kỳ Hoa VNĐ/m2 11,700 1 11,700 Kỳ Hưng 11,700 1 11,700 Kỳ Châu 15,600 1 15,600 Table 21: Replacement cost for house and structure Price regulated by Proposed No Description Unit Ha Tinh PPC replacement cost 1 House VND/m2 4,800,000 4,800,000 2 Kitchen VND/m2 1,500,000 1,500,000 3 Breeding facility VND/m2 1,250,000 1,250,000 4 Auxiliary facility VND/m2 2,000,000 2,000,000 5 Fence VND/m 340,000 340,000 2 6 Yard VND/m 180,000 180,000 7 Gate piece 750,000 750,000 8 Water tank Piece 1,660,000 1,660,000 9 Well Piece 350,000 350,000 Tabble 22: Replacement cost for crop and vegetation Price regulated by Proposed No Description Unit Ha Tinh PPC replacement cost 1 Rice VND/m2 5,000 5,000 2 2 Crop VND/m 6,000 6,000 2 3 Fruit tree Tree/m 200,000 200,000 4 Timber tree Tree/m2 50,000 50,000 13.3. Budget estimation 132. Tentative budget for the resettlement is made based on mentioned price, including compensation for land and non-land assets, assistance and contingency, with total amount of 83,470,000,000 VND, equivalent to 3,709,778 USD. This cost estimate will be updated to ensure compensation at replacement cost at time of resettlement implementation. 133. Budget for Resettlement is taken from HA Tinh PPC counterpart fund and will allocated promptly and sufficiently against the resettlement schedule. Page 66 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Table 23: Tentative budget for the RAP implementation No Description Cost estimate I Cost for compensation and support 59,222,270,147 1 Main road connecting urban centers 38,319,456,477 2 Construction of wastewater collection and treatment system 2,384,768,166 3 Tri river embankment and operations roads 18,518,045,504 II Cost for support and allowance 16,526,838,763 1 Support for transportation, resettlement 84,000,000 2 Support for land rent for relocated households 100,800,000 3 Support for life subsistence 3,219,840,000 4 Support for job change 12,160,198,763 5 Support for vulnerable households 32,000,000 6 Support for business households 55,000,000 7 Support for self-accomodation 700,000,000 8 Incentive bonues 175,000,000 III Income restoration program 828,450,000 IV Management cost 6,891,980,302 1 Implementation cost (2%) 1,531,551,178 2 Independent monitoring consultant cost (2%) 1,531,551,178 3 Contingency cost (5%) 3,828,877,945 V Total 83,469,539,212 Rounded 83,470,000,000 Exchange to USD (1USD =22,500) 3,709,778 Page 67 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province PART 14: MONITORING AND EVALUATION 14.1. Monitoring’s objective To ensure activities and commitments described in the approved RAP is implemented fully and timely, monitoring and evaluation of the RAP implementation should be maintained by the Project Owner. While monitoring of the RAP implementation aims to collect, on a regular basis, information reflecting the RAP implementation results (See Appendix for suggestive monitoring indicators) the evaluation of RAP implementation aims to analyze the information collected throughout monitoring process, to evaluate at outcome level, the extent to which the RAP is executed in accordance with the agreed schedule and methods, and that the RAP implementation meets the objective of the World Bank’s Operational Policy 4.12 on Involuntary Resettlement. In case where gaps (between resettlement action plan and actual implementation) are identified during the implementation process, corrective measures will be proposed for timely action by PMU. Social risks posed by labor influx of contractors into the communities surrounding the project area also need monitoring regularly. Specific objectives are as follows: (i) To ensure that the standard of living of PAPs are restored or improved; (ii) To monitor whether the overall project and resettlement objectives are being met in accordance with the Resettlement Action Plan, and if not to suggest corrective measures; (iii) To assess if compensation and rehabilitation measures are sufficient and comply with the WB’s OP4.12; (iv) Monitor and provide advice on the prevention of potential risks posed by labor influx into the communities surrounding the project area (i.e. the people living or working in the communes immediately adjacent to the project site) during construction; (v) Monitor and provide advice on the adequate protection of construction workers’ safety at the construction site and the implementation of good work-place safety practices during construction; (vi) Monitor the implementation of mitigation measures for social risks (if any) posed by labor influx of contractors into the communities surrounding the project area; (vii) Monitor and provide advice on the adequate implementation of the project’s Grievance Redress Mechanism (GRM); and to identify problems or potential problems and recommend remidies for problems. 14.2. Internal monitoring 134. PMU is responsible to conduct internal monitoring on resettlement implementation. PMU will assign a specialized PMU staff to conduct internal monitoring with key assignments as below: - Coordinate with related agencies in process of RAP implementation; - Collect necessary data, to set up a database of resettlement for RAP implementation progress reports for internal monitoring purpose; - Identify any pending issues/non-compliance issues during RAP implementation; Page 68 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province - Work closely with the Independent Monitoring Consultant to oversee the implementation of RAP; - Status of labor influx and its social impact on communities and implementation of mitigation measures; - Resettlement sites and progress of relocation; - Receive and resolve complaint of affected people. - Implementation of LRP 135. Depending on the nature and complexity of the RAP, and RAP implementation stages, the internal monitoring can be maintained weekly, monthly, and/or quarterly. A quarterly report should be preparedin the form of appendix of the progress report, as a minimun, to ensure a) RAP implementation complies with OP4.12, b) any issues that may arise so as to take timely and appropriate action. Monitoring indicators are proposed in Annex. 136. The implementation agencies will collect information every month from the different resettlement committees. A database tracking the resettlement implementation of the Project will be maintained and updated monthly. 137. The implementation agencies will submit internal monitoring reports on the RAP implementation as a part of the quarterly report they are supposed to submit the WB. The reports should contain the following key information: - Number of affected persons according to types of effect and project component and the status of compensation, relocation and income recovery for each item. - The distributed costs for the activities or for compensation payment and disbursed cost for each activity. - List of outstanding complaints; - Final results on solving complaints and any outstanding issues that demand management agencies at all levels to solve. - Arisen issues in the implementation process and resolutions for them. - Updated actual schedule of resettlement activities. - Status of labor influx and implementation of mintigation measures; - Resettlement sites, status and progress of relocation. - Implementation of livelihood restoration program 14.3. External monitoring 138. Objectives: The general objectives of external monitoring are providing periodically independent monitoring and assessing the implementation of the resettlement objectives, changes of living standard and jobs, income and livelihood restoration of PAPs, effectiveness, impacts and sustainability of PAPs’ entitlements, and the necessity of mitigation measures (if any) in an attempt to bring about strategic lessons for making policy and planning in the future. 139. Responsible Agencies: In accordance with the World Bank requirements for consultant employment, PMU will recruit an external organization for conducting the independent Page 69 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province monitoring and evaluation of RAPs implementation. This organization is called the Independent Monitoring Agency (IMA) which has expertise in social science and experience in independent monitoring of RAP. The IMA should start their work as soon as at the beginning of project implementation. 140. Monitoring and Evaluation: The following issues will be monitored and evaluated by the IMA, including but not limited to: - Payment of compensation will be as follows: a) full payment to be made to all affected persons sufficiently before land acquisition; (b) adequacy of payment to replace affected assets. - Provision of assistance for PAPs who have to rebuild their houses on their remaining land, or building their houses in new places as arranged by the project, or on newly assigned plots. - Income and livelihood restoration allowances. - Community consultation and public dissemination of compensation policy: (a) PAPs should be fully informed and consulted about land acquisition, leasing and relocation activities; (b) public awareness of the compensation policy and entitlements will be assessed among the PAPs; and (c) assessment of awareness of various options available to DPs as provided for in the RAPs. - Income and livelihood restoration of PAPs. - Operation of the complaint mechanism and complaint settlement of PAPs. - PAPs’ satisfaction level on various aspects of the RAP will be monitoring and recorded. - Through the implementation, trends on living standard will be observed and surveyed. Any potential issues in the recovering living standard are reported and suitable measures will be proposed to ensure the project objectives. - Monitor and provide advice on the prevention of potential risks posed by labor influx into the communities surrounding the project area (i.e. the people living or working in the communes immediately adjacent to the project site) during construction; - Monitor and provide advice on the adequate protection of construction workers’ safety at the construction site and the implementation of good work-place safety practices during construction; - Monitor and provide advice on the adequate implementation of the project’s Grievance Redress Mechanism (GRM); and to identify problems or potential problems and recommend remidies for problems. 141. Methodology for Independent Monitoring: Method of monitoring should be a combined quantitative and qualitative method with public meeting, focus group discussion, in- depth interview and sample survey. Scale of the survey sample may cover 100% displaced households and severely and affected households, and at least 20% of the remaining households for each monitoring mission. The surveys should include women, elderly persons, and other vulnerable target groups. It should have equal representation of male and female respondents Page 70 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province 142. Monitoring Reports: The independent monitoring agency shall submit semi-annual reports which reflect the findings in the monitoring process. This monitoring report will be submitted to the PMU and then the PMU will submit to the WB. The report should contain (i) progress of RAP implementation; (ii) deviations, if any, from the provisions and principles of the RAP; (iii) identification of outstanding issues and recommended solutions so that the executive agencies are informed about the ongoing situation and can resolve problems in a timely manner; and (iv) progress of the follow-up of problems and issues identified in the previous report 143. Ex-post resettlement Evaluation: The external monitor will conduct an evaluation of the resettlement implementation 6 to 12 months after the completion of all resettlement activities. Report of the ex-post resettlement evaluation will be included in Project Completion Report (PCR). Resettlement implementation cannot be considered completed until an ex-post evaluation and a project completion audit confirm that all the affected HHs have received fully all compensation, assistance and life restoration processes as planned. Page 71 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province ANNEXES Annex 1: Minutes of public consultation meetings 1. Ky Hoa communal People’s Committee Page 72 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Page 73 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Page 74 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province 2. Song Tri ward People’s Committee Page 75 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Page 76 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Page 77 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province 3. Ky Hung communal People’s Committee Page 78 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Page 79 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Page 80 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province 4. Song Tri ward People’s Committee Page 81 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Page 82 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Page 83 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province 5. Ky Chau communal People’s Committee Page 84 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Page 85 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Page 86 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Annex 2: List of affected households Hamlet/residential Code Full name Gender Ward/commune group I Work item 1: Construction of main road connecting urban centers WI1: 01 Bùi Văn Sự Male Tân Tiến Kỳ Hưng WI1: 02 Đào Thị Kỷ Female Hiệu Châu Kỳ Hưng WI1: 03 Dương Trọng Bình Male Hiệu Châu Kỳ Hưng WI1: 04 Hoàng Văn Hằng Male Hiệu Châu Kỳ Hưng WI1: 05 Lê Hồng Khiên Male Hiệu Châu Kỳ Hưng WI1: 06 Lê Thị Liễn Female Châu Long Kỳ Hưng WI1: 07 Lê Văn Cứ Male Tân Tiến Kỳ Hưng WI1: 08 Lê Văn Đồng Male Trung Thượng Kỳ Hưng WI1: 09 Lê Văn Lương Male Tân Hà Kỳ Hưng WI1: 10 Lê Văn Mạnh Male Trung Thượng Kỳ Hưng WI1: 11 Lê Văn Trung Male Trung Thượng Kỳ Hưng WI1: 12 Mai Thị Chuẩn Female Hiệu Châu Kỳ Hưng WI1: 13 Nguyễn Đức Phú Male Trung Thượng Kỳ Hưng WI1: 14 Nguyễn Đức Việt Male Tân Tiến Kỳ Hưng WI1: 15 Nguyễn Duệ Male Hiệu Châu Kỳ Hưng WI1: 16 Nguyễn Phan Nhất Male Thuận Châu Kỳ Hưng WI1: 17 Nguyễn Thanh Trúc Female Thuận Châu Kỳ Hưng WI1: 18 Nguyễn Thị Hiếu Female Hiệu Châu Kỳ Hưng WI1: 19 Nguyễn Thị Nga Female Tân Hà Kỳ Hưng WI1: 20 Nguyễn Thị Nuôi Female Hiệu Châu Kỳ Hưng WI1: 21 Nguyễn Thị Thuận Female Tân Thiến Kỳ Hưng WI1: 22 Nguyễn Thị Thúy Female Tân Tiến Kỳ Hưng WI1: 23 Nguyễn Tiến Hồng Male Hiệu Châu Kỳ Hưng WI1: 24 Nguyễn Tiến Hồng Male Hiệu Châu Kỳ Hưng WI1: 25 Nguyễn Tiến Lan Male Hiệu Châu Kỳ Hưng WI1: 26 Nguyễn Tiến Nam Male Hiệu Châu Kỳ Hưng WI1: 27 Nguyễn Tiến Sơn Male Trung Thượng Kỳ Hưng WI1: 28 Nguyến Tiến Thành Male Tân Tiến Kỳ Hưng WI1: 29 Nguyễn Tiến Thị Male Trung Thượng Kỳ Hưng WI1: 30 Nguyễn Văn Duẩn Male Trung Thượng Kỳ Hưng WI1: 31 Nguyễn Văn Hiến Male Tân Tiến Kỳ Hưng WI1: 32 Nguyễn Văn Hương Male Tân Tiến Kỳ Hưng WI1: 33 Nguyễn Văn Lương Male Tân Tiến Kỳ Hưng WI1: 34 Nguyễn Văn Phương Male Tân Tiến Kỳ Hưng WI1: 35 Nguyễn Văn Quý Male Tân Tiến Kỳ Hưng Page 87 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Hamlet/residential Code Full name Gender Ward/commune group WI1: 36 Nguyễn Văn Tính Male Tân Tiến Kỳ Hưng WI1: 37 Nguyễn Văn Tòe Male Hiệu Châu Kỳ Hưng WI1: 38 Nguyễn Văn Tứ Male Thuận Châu Kỳ Hưng WI1: 39 Nguyễn Văn Vĩnh Male Trung Thượng Kỳ Hưng WI1: 40 Phạm Thị Cúc Male Trung Thượng Kỳ Hưng WI1: 41 Phạm Văn Hưởng Male Tân Hà Kỳ Hưng WI1: 42 Phan Công Ba Male Tân Tiến Kỳ Hưng WI1: 43 Phan Công Minh Male Châu Long Kỳ Hưng WI1: 44 Phan Công Thanh Male Tân Tiến Kỳ Hưng WI1: 45 Phan Công Trung Male Tân Tiến Kỳ Hưng WI1: 46 Phan Thị Cúc Female Trung Thượng Kỳ Hưng WI1: 47 Phan Thị Vinh Female Tân Tiến Kỳ Hưng WI1: 48 Phạm Văn Sỹ Male Trung Thượng Kỳ Hưng WI1: 49 Phùng Sỹ Liện Male Trung Thượng Kỳ Hưng WI1: 50 Phùng Văn Châu Male Thuận Châu Kỳ Hưng WI1: 51 Phùng Văn Chuyển Male Trung Thượng Kỳ Hưng WI1: 52 Phùng Văn Công Male Tân Hà Kỳ Hưng WI1: 53 Phùng Văn Huy Male Tân Hà Kỳ Hưng WI1: 54 Phùng Văn Thùy Male Tân Hà Kỳ Hưng WI1: 55 Thông Văn Kỳ Male Hiệu Châu Kỳ Hưng WI1: 56 Trần Công Hòa Male Tân Tiến Kỳ Hưng WI1: 57 Trần Văn Hương Male Châu Long Kỳ Hưng WI1: 58 Trần Văn Kỳ Male Hiệu Châu Kỳ Hưng WI1: 59 Trương Công Nam Male Tân Hà Kỳ Hưng WI1: 60 Võ Đức Thuấn Male Thuận Châu Kỳ Hưng WI1: 61 Võ Xuân Lý Male Tân Hà Kỳ Hưng WI1: 62 Dương Văn Xy Male Kỳ Trinh WI1: 63 Hoàng Đình Hùng Male Kỳ Trinh WI1: 64 Lê Ngọc Lý Female Kỳ Trinh WI1: 65 Lê Thị Lý Female Kỳ Trinh WI1: 66 Lê Thị Sinh Female Kỳ Trinh WI1: 67 Mai Văn Toàn Male Kỳ Trinh WI1: 68 Nguyễn Cát Quý Male Kỳ Trinh WI1: 69 Nguyễn Đình Chuông Male Kỳ Trinh WI1: 70 Nguyễn Đình Đồng Male Kỳ Trinh WI1: 71 Nguyễn Đình Lục Male Kỳ Trinh WI1: 72 Nguyễn Đình Ngoạn Male Kỳ Trinh Page 88 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Hamlet/residential Code Full name Gender Ward/commune group WI1: 73 Nguyễn Đình Nhuận Male Kỳ Trinh WI1: 74 Nguyễn Đình Tứ Male Kỳ Trinh WI1: 75 Nguyễn Hữu Thành Male Kỳ Trinh WI1: 76 Nguyễn Hữu Thọ Male Kỳ Trinh WI1: 77 Nguyễn Phúc Đính Male Kỳ Trinh WI1: 78 Nguyễn Thái Sơn Male Kỳ Trinh WI1: 79 Nguyễn Thị Ân Female Kỳ Trinh WI1: 80 Nguyễn Thị Choan Female Kỳ Trinh WI1: 81 Nguyễn Thị Duy Female Kỳ Trinh WI1: 82 Nguyễn Thị Duyệt Female Kỳ Trinh WI1: 83 Nguyễn Thị Hưởm Female Kỳ Trinh WI1: 84 Nguyễn Thị Khân Female Kỳ Trinh WI1: 85 Nguyễn Thị Luân Female Kỳ Trinh WI1: 86 Nguyễn Thị Thu Female Kỳ Trinh WI1: 87 Nguyễn Thị Thủy Female Kỳ Trinh WI1: 88 Nguyễn Thị Vân Female Kỳ Trinh WI1: 89 Nguyễn Thị Yến Female Kỳ Trinh WI1: 90 Nguyễn Tiến Cẩn Male Kỳ Trinh WI1: 91 Nguyễn Tiến Hùng Male Kỳ Trinh WI1: 92 Nguyễn Tiến Vình Male Kỳ Trinh WI1: 93 Nguyễn Văn Ân Male Kỳ Trinh WI1: 94 Nguyễn Văn Chánh Male Kỳ Trinh WI1: 95 Nguyễn Văn Dũng Male Kỳ Trinh WI1: 96 Nguyễn Văn Hậu Male Kỳ Trinh WI1: 97 Nguyễn Văn Hùng Male Kỳ Trinh WI1: 98 Nguyễn Văn Kính Male Kỳ Trinh WI1: 99 Nguyễn Văn Nha Male Kỳ Trinh WI1: 100 Nguyễn Văn Quyền Male Kỳ Trinh WI1: 101 Nguyễn Văn Tình Male Kỳ Trinh WI1: 102 Nguyễn Văn Tuấn Male Kỳ Trinh WI1: 103 Thái Văn Thuận Male Kỳ Trinh WI1: 104 Trần Anh Dũng Male Kỳ Trinh WI1: 105 Trần Chí Thanh Male Kỳ Trinh WI1: 106 Trần Đình Doãn Male Kỳ Trinh WI1: 107 Trần Đình Hoán Male Kỳ Trinh WI1: 108 Trần Đình Khoái Male Kỳ Trinh WI1: 109 Trần Đình Lưu Male Kỳ Trinh Page 89 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Hamlet/residential Code Full name Gender Ward/commune group WI1: 110 Trần Đình Thông Male Kỳ Trinh WI1: 111 Trần Đình Thường Male Kỳ Trinh WI1: 112 Trần Đình Xuyên Male Kỳ Trinh WI1: 113 Trần Hưng Đạo Male Kỳ Trinh WI1: 114 Trần Hữu Tài Male Kỳ Trinh WI1: 115 Trần Ngọc Thạch Male Kỳ Trinh WI1: 116 Trần Ngọc Thái Male Kỳ Trinh WI1: 117 Trần Nhật Lệ Female Kỳ Trinh WI1: 118 Trần Phừng Male Kỳ Trinh WI1: 119 Trần Quang Lục Male Kỳ Trinh WI1: 120 Trần Quý Dương Male Kỳ Trinh WI1: 121 Trần Sao Khuê Male Kỳ Trinh WI1: 122 Trần Thanh Bình Male Kỳ Trinh WI1: 123 Trần Thị Duệ Female Kỳ Trinh WI1: 124 Trần Uy Female Kỳ Trinh WI1: 125 Trần Văn Phừng Male Kỳ Trinh WI1: 126 Trần Văn Phừng (Hùng) Male Kỳ Trinh WI1: 127 Trần Xuân Định Male Kỳ Trinh WI1: 128 Trần Xuân Lan Female Kỳ Trinh WI1: 129 Trần Xuân Minh Male Kỳ Trinh WI1: 130 Trần Xuân Ngự Male Kỳ Trinh WI1: 131 Trần Xuân Trường Male Kỳ Trinh WI1: 132 Trương Công Giang Male Kỳ Trinh WI1: 133 Trương Công Hanh Male Kỳ Trinh WI1: 134 Trương Công Kế Male Kỳ Trinh WI1: 135 Trương Công Khoa Female Kỳ Trinh WI1: 136 Trương Công Thiêm Male Kỳ Trinh WI1: 137 Trương Thị Hiệp Female Kỳ Trinh WI1: 138 Trương Thị Huê Female Kỳ Trinh WI1: 139 Võ Thị Liến Female Kỳ Trinh WI1: 140 Võ Trung Hậu Male Kỳ Trinh WI1: 141 Võ Văn Hào Male Kỳ Trinh WI1: 142 Võ Văn Kỳ Male Kỳ Trinh WI1: 143 Võ Văn Lin Male Kỳ Trinh WI1: 144 Võ Văn Noại Male Kỳ Trinh WI1: 145 Võ Văn Quyến Male Kỳ Trinh WI1: 146 Võ Văn Quyện Male Kỳ Trinh Page 90 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Hamlet/residential Code Full name Gender Ward/commune group WI1: 147 Võ Văn Tấn Male Kỳ Trinh WI1: 148 Võ Văn Ươm Male Kỳ Trinh WI1: 149 Đặng Thị Cẩm Female Kỳ Châu WI1: 150 Duong Thị Hiểu (Văn) Female Kỳ Châu WI1: 151 Hà Thị Dy Female Kỳ Châu WI1: 152 Hoàng Thị Huê Female Kỳ Châu WI1: 153 Hoàng Văn Hồng Male Kỳ Châu WI1: 154 Lê Thị Dung Female Kỳ Châu WI1: 155 Lê Văn Thiệu Male Kỳ Châu WI1: 156 Lê Xuân Huy Male Kỳ Châu WI1: 157 Mai Thị Chuẩn Female Kỳ Châu WI1: 158 Nguễn Thị Lan (Văn) Female Kỳ Châu WI1: 159 Nguễn Tiến Thắng Male Kỳ Châu WI1: 160 Nguyễn Bá Dinh Male Kỳ Châu WI1: 161 Nguyễn Cao Cường Male Kỳ Châu WI1: 162 Nguyễn Đức Hoàn Male Kỳ Châu WI1: 163 Nguyễn Duệ Male Kỳ Châu WI1: 164 Nguyễn Hổng Vân Male Kỳ Châu WI1: 165 Nguyễn Hữu Lệ Male Kỳ Châu WI1: 166 Nguyễn Hữu Quỳnh Male Kỳ Châu WI1: 167 Nguyễn Quang Hiệu Male Kỳ Châu WI1: 168 Nguyễn Quốc Thuấn Male Kỳ Châu WI1: 169 Nguyễn Quốc Yên Male Kỳ Châu WI1: 170 Nguyễn Thị Anh Female Kỳ Châu WI1: 171 Nguyễn Thị Hải Female Kỳ Châu WI1: 172 Nguyễn Thị Hồng Female Kỳ Châu WI1: 173 Nguyễn Thị Nga Female Kỳ Châu WI1: 174 Nguyễn Thị Sáu Female Kỳ Châu WI1: 175 Nguyễn Thị Tình Female Kỳ Châu WI1: 176 Nguyễn Tiến Dụ Male Kỳ Châu WI1: 177 Nguyễn Tiến Dung Male Kỳ Châu WI1: 178 Nguyễn Tiến Hiền (Vân) Male Kỳ Châu WI1: 179 Nguyễn Tiến Hồng Male Kỳ Châu WI1: 180 Nguyễn Tiến Hợp Male Kỳ Châu WI1: 181 Nguyễn Tiến Lan Male Kỳ Châu WI1: 182 Nguyễn Tiến Lan (Phơn) Male Kỳ Châu WI1: 183 Nguyễn Tiến Lĩnh Male Kỳ Châu Page 91 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Hamlet/residential Code Full name Gender Ward/commune group WI1: 184 Nguyễn Tiến Thắng Male Kỳ Châu WI1: 185 Nguyễn Văn Dương Male Kỳ Châu WI1: 186 Nguyễn Văn Khánh Male Kỳ Châu WI1: 187 Nguyễn Văn Khư Male Kỳ Châu WI1: 188 Nguyễn Văn Nam Male Kỳ Châu WI1: 189 Nguyễn Văn Ổn Male Kỳ Châu WI1: 190 Nguyễn Văn Thế Male Kỳ Châu WI1: 191 Nguyễn Văn Thuấn Male Kỳ Châu WI1: 192 Nguyễn Văn Tỉu Male Kỳ Châu WI1: 193 Phạm Thị Liệu Male Kỳ Châu WI1: 194 Phan Chí Hiếu Male Kỳ Châu WI1: 195 Phan Công Anh Male Kỳ Châu WI1: 196 Phan Công Điệp Male Kỳ Châu WI1: 197 Phan Công Hương Male Kỳ Châu WI1: 198 Phan Công Khoa Male Kỳ Châu WI1: 199 Phan Công Nhung Male Kỳ Châu WI1: 200 Phan Công Việt Male Kỳ Châu WI1: 201 Trần Đức Quang Male Kỳ Châu WI1: 202 Trần Hồng Nhung Female Kỳ Châu WI1: 203 Trần Thế Kỹ Male Kỳ Châu WI1: 204 Trần Thị Liên Female Kỳ Châu WI1: 205 Trần Thị Sau Female Kỳ Châu WI1: 206 Trần Văn Kỳ Male Kỳ Châu WI1: 207 Uân Male Kỳ Châu WI1: 208 Đức Male Kỳ Châu II Work item 2: Construction of wastewater collection and treatment system WI2: 01 Phạm Văn Cơ Male Trần Phú Kỳ Hưng WI2: 02 Cao Văn Khẩn Male Hưng Phú Kỳ Hưng WI2: 03 Cao Xuân Quyết Male Trần Phú Kỳ Hưng WI2: 04 Cao Xuân Quynh Male Hưng Phú Kỳ Hưng WI2: 05 Hồ Văn Đoàn Male Trần Phú Kỳ Hưng WI2: 06 Lê Ngọc Sơn Male Hưng Phú Kỳ Hưng WI2: 07 Lê Thanh Nghị Male Hưng Phú Kỳ Hưng WI2: 08 Lê Thị Thanh Thúy Female Trần Phú Kỳ Hưng WI2: 09 Lê Thị Tuệ Female Hưng Phú Kỳ Hưng WI2: 10 Lê Văn Như Male Trần Phú Kỳ Hưng WI2: 11 Lê Văn Thảo Male Hưng Phú Kỳ Hưng Page 92 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Hamlet/residential Code Full name Gender Ward/commune group WI2: 12 Lê Xuân Phâng Male Hưng Phú Kỳ Hưng WI2: 13 Mai Quang Nhinh Male Trần Phú Kỳ Hưng WI2: 14 Mai Thái Dương Male Hưng Phú Kỳ Hưng WI2: 15 Mai Văn Cường Male Trần Phú Kỳ Hưng WI2: 16 Mai Văn Đằng Male Hưng Phú Kỳ Hưng WI2: 17 Mai Văn Đạt Male Hưng Phú Kỳ Hưng WI2: 18 Mai Văn Hệ Male Hưng Phú Kỳ Hưng WI2: 19 Mai Văn Hùng Male Trần Phú Kỳ Hưng WI2: 20 Mai Văn Thắng Male Trần Phú Kỳ Hưng WI2: 21 Mai Văn Thìn Male Hưng Phú Kỳ Hưng WI2: 22 Mai Văn Tuấn Male Trần Phú Kỳ Hưng WI2: 23 Nguyễn Đình Đạt Male Hưng Phú Kỳ Hưng WI2: 24 Nguyễn Đình Nhâm Male Trần Phú Kỳ Hưng WI2: 25 Nguyễn Đình Tài Male Hưng Phú Kỳ Hưng WI2: 26 Nguyễn Đình Tứ Male Trần Phú Kỳ Hưng WI2: 27 Nguyễn Hồng Lam Male Trần Phú Kỳ Hưng WI2: 28 Nguyễn Hồng Vĩnh Male Hưng Phú Kỳ Hưng WI2: 29 Nguyễn Hữu Thọ Male Hưng Phú Kỳ Hưng WI2: 30 Nguyễn Quang Hợi Male Trần Phú Kỳ Hưng WI2: 31 Nguyễn Thái Nam Male Trần Phú Kỳ Hưng WI2: 32 Nguyễn Thị Nguyệt Female Trần Phú Kỳ Hưng WI2: 33 Nguyễn Thị Xuân Female Hưng Phú Kỳ Hưng WI2: 34 Nguyễn Tiến Dương Male Hưng Phú Kỳ Hưng WI2: 35 Nguyễn Tiến Hợi Male Trần Phú Kỳ Hưng WI2: 36 Nguyễn Tiến Khiên Male Trần Phú Kỳ Hưng WI2: 37 Nguyễn Tiến Mong Male Trần Phú Kỳ Hưng WI2: 38 Nguyễn Văn Bính Male Trần Phú Kỳ Hưng WI2: 39 Nguyễn Văn Chính Male Trần Phú Kỳ Hưng WI2: 40 Nguyễn Văn Cừ Male Trần Phú Kỳ Hưng WI2: 41 Nguyễn Văn Đuệ Male Trần Phú Kỳ Hưng WI2: 42 Nguyễn Văn Hồng Male Trần Phú Kỳ Hưng WI2: 43 Nguyễn Văn Khuyến Male Trần Phú Kỳ Hưng WI2: 44 Nguyễn Văn Nuôi Male Hưng Phú Kỳ Hưng WI2: 45 Nguyễn Văn Phúc Male Trần Phú Kỳ Hưng WI2: 46 Nguyễn Văn Thái Male Trần Phú Kỳ Hưng WI2: 47 Nguyễn Văn Thanh Male Trần Phú Kỳ Hưng WI2: 48 Nguyễn Văn Thửa Male Hưng Phú Kỳ Hưng Page 93 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Hamlet/residential Code Full name Gender Ward/commune group WI2: 49 Nguyễn Văn Trí Male Trần Phú Kỳ Hưng WI2: 50 Nguyễn Xuân Nguyên Male Hưng Phú Kỳ Hưng WI2: 51 Nguyễn Xuân Thủy Male Hưng Phú Kỳ Hưng WI2: 52 Phạm Đình Thống Male Trần Phú Kỳ Hưng WI2: 53 Phạm Đình Thuyn Male Trần Phú Kỳ Hưng WI2: 54 Phạm Đình Trọng Male Hưng Phú Kỳ Hưng WI2: 55 Phạm Hoạnh Male Trần Phú Kỳ Hưng WI2: 56 Phạm Văn Thảnh Male Trần Phú Kỳ Hưng WI2: 57 Phạm Xuân Linh Male Hưng Phú Kỳ Hưng WI2: 58 Phan Công Diện Male Trần Phú Kỳ Hưng WI2: 59 Phan Công Duận Male Trần Phú Kỳ Hưng WI2: 60 Phan Công Khiên Male Trần Phú Kỳ Hưng WI2: 61 Phan Công Nam Male Trần Phú Kỳ Hưng WI2: 62 Phan Công Quế Male Trần Phú Kỳ Hưng WI2: 63 Phan Công Tâm Male Trần Phú Kỳ Hưng WI2: 64 Phan Thị Huệ Female Trần Phú Kỳ Hưng WI2: 65 Phan Thị Quế Female Trần Phú Kỳ Hưng WI2: 66 Phan Văn Bính Male Trần Phú Kỳ Hưng WI2: 67 Phan Xuân Liêm Male Trần Phú Kỳ Hưng WI2: 68 Tăng Thị Hà Female Hưng Phú Kỳ Hưng WI2: 69 Trần Hồng Lĩnh Female Trần Phú Kỳ Hưng WI2: 70 Trần Minh Chiến Male Hưng Phú Kỳ Hưng WI2: 71 Trần Thị Khuyên Female Trần Phú Kỳ Hưng WI2: 72 Trần Thị Thành Female Hưng Phú Kỳ Hưng WI2: 73 Trần Văn Nuôi Male Hưng Phú Kỳ Hưng WI2: 74 Trần Văn Quang Male Hưng Phú Kỳ Hưng WI2: 75 Trần Văn Quy Male Hưng Phú Kỳ Hưng WI2: 76 Trần Văn Thanh Male Trần Phú Kỳ Hưng WI2: 77 Trần Văn Trị Male Hưng Phú Kỳ Hưng WI2: 78 Trần Văn Vinh Male Hưng Phú Kỳ Hưng WI2: 79 Trần Viết Lượng Male Trần Phú Kỳ Hưng WI2: 80 Trịnh Văn Đề Male Trần Phú Kỳ Hưng WI2: 81 Võ Thị Thú Female Hưng Phú Kỳ Hưng III Construction of embankment and road on Tri river banks WI3:01 Nguyễn Thị Nhi Female Hòa Đông Kỳ Hoa WI3:02 Nguyễn Văn Hồng Male Hòa Đông Kỳ Hoa WI3:03 Đào Lâm Úy Male Hòa Đông Kỳ Hoa Page 94 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Hamlet/residential Code Full name Gender Ward/commune group WI3:04 Nguyễn Tiến Việt Male Hòa Đông Kỳ Hoa WI3:05 Nguyễn Văn Minh Male Hòa Đông Kỳ Hoa WI3:06 Thiều Văn Huê Male Hòa Đông Kỳ Hoa WI3:07 Trần Thị Hưởng Female Hòa Đông Kỳ Hoa WI3:08 Đặng Xuân Thiêm Male Hòa Đông Kỳ Hoa WI3:09 Lê Quang Anh Male Hòa Đông Kỳ Hoa WI3:10 Nguyễn Văn Mạnh Male Hòa Đông Kỳ Hoa WI3:11 Trần Thị Hưởng Female Hòa Đông Kỳ Hoa WI3:12 Trần Văn Lâm Male Hòa Tây Kỳ Hoa WI3:13 Nguyễn Văn Sơn Male Hòa Tây Kỳ Hoa WI3:14 Thiều Thị Loan Male Hòa Tây Kỳ Hoa WI3:15 Hoàng Văn Phong Male Hòa Tây Kỳ Hoa Male Hòa Tây Kỳ Hoa WI3:16 Đặng Văn Sanh WI3:17 Bùi Anh Hiếu Male Sông Trí WI3:18 Đặng Xuân Quyền Sông Trí WI3:19 Đặng Xuân Thao Sông Trí WI3:20 Đào Quốc Thành Sông Trí WI3:21 Đào Thị Lý Sông Trí WI3:22 Đào Thị Tân Sông Trí WI3:23 Đào Thị Tâm Sông Trí WI3:24 Nguyễn Anh Tuấn Sông Trí WI3:25 Nguyễn Đình Trung Sông Trí WI3:26 Nguyễn Đình Tuýn Sông Trí WI3:27 Nguyễn Đức Lý Sông Trí WI3:28 Nguyễn Hữu Môn Sông Trí WI3:29 Nguyễn Thị Lê Sông Trí WI3:30 Nguyễn Tiến Biêng Sông Trí WI3:31 Nguyễn Tiến Kỳ Sông Trí WI3:32 Nguyễn Tiến Trọng Sông Trí WI3:33 Nguyễn Trọng Định Sông Trí WI3:34 Nguyễn Văn Báu Sông Trí WI3:35 Nguyễn Văn Định Sông Trí WI3:36 Nguyễn Văn Phúc Sông Trí WI3:37 Phạm Thị Khẩn Sông Trí WI3:38 Phạm Thị Niệm Sông Trí Page 95 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Hamlet/residential Code Full name Gender Ward/commune group WI3:39 Phạm Thị Phơn Sông Trí WI3:40 Phùng Thị Thỏa Sông Trí WI3:41 Thiều Quanng Hồng Sông Trí WI3:42 Thiều Quang Lĩnh Sông Trí WI3:43 Thiều Xuân Hởi Sông Trí WI3:44 Thiều Xuân Khánh Sông Trí WI3:45 Trần Đình Thành Sông Trí WI3:46 Trần Thị Diên Sông Trí WI3:47 Trần Văn Thắng Sông Trí WI3:48 Trương Công Nhỏ Sông Trí WI3:49 Sông Trí WI3:50 Sông Trí WI3:51 Sông Trí WI3:52 Sông Trí WI3:53 Sông Trí WI3:54 Sông Trí WI3:55 Sông Trí Page 96 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province Annex 3: Proposed term of reference for independent monitoring consultant I. Introduction 1. The Project is implemented in five cities/towns, including (1) Hai Duong city (Hai Duong province); (2) Ky Anh town (Ha Tinh Province); (3) Tinh Gia town (Thanh Hoa Province); and (4) Yen Bai city (Yen Bai Province). 2. The overall objective of the project is to increase access to urban infrastructure and improve integrated urban planning in the project cities. 3. The Project comprises of 2 components with the following contents: - Component 1: Structural Investments - Rehabilitation and Construction of Resilient Urban Infrastructure; 4. Component 2: Non-structural Investments - Technical assistance and implementation support. The duration of “the Dynamic Cities Integrated Development Project” is expected to be 5 years, starting in 2019 and completed in 2025. II. Objectives of external monitoring 5. Overall objective of external monitoring is periodically external monitoring and evaluating the achievement of resettlement objectives, changes in living standards and jobs, income and livelihood restoration of affected persons, effectiveness, impacts and sustainability of APs’ entitlements, necessity for mitigation measures of losses (if any) and strategic lessons for policy making and planning in the future. III. Scope of work 1) Assignments of consulting agency - Determine whether the procedures for AHs participation and delivery of compensation and other rehabilitation entitlements has been done in accordance with the WB’s OP4.12 and approved RAP, and - Assess if the WB’s OP4.12 and RAP objective of enhancement or at least restoration of living standards and income levels of DPs have been met. - Gather qualitative indications of the social and economic impact of Project implementation on the AHs. - Suggest modification in the implementation procedures, as the case may be to achieve the principles and objectives of this WB’s OP4.12 and RAP. 2) Monitoring issues (i) to ensure that the standard of living of PAPs are restored or improved; (ii) to monitor whether the overall project and resettlement objectives are being met in accordance with the Resettlement Action Plan, and if not to suggest corrective measures; (iii) to assess if compensation and rehabilitation measures are sufficient and comply with the WB’s OP4.12; (iv) Monitor and provide advice on the prevention of potential risks posed by labor influx into the communities surrounding the project area (i.e. the people living or working in the communes immediately adjacent to the project site) during construction; Page 97 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province (v) Monitor and provide advice on the adequate protection of construction workers’ safety at the construction site and the implementation of good work-place safety practices during construction; (vi) Monitor and provide advice on the adequate implementation of the project’s Grievance Redress Mechanism (GRM); and to identify problems or potential problems and recommend remidies for problems. The monitoring will be conducted for all work items of component 1 of the Project DCIDP Ky Anh, Ha Tinh province. a. Monitoring indicators The External Monitoring Agency will monitor and assess the following key indicators: (i) Payment of compensation: a) Full payment to all affected households before the land clearance; adequate payment to affected assets. b) Compensation for affected works must be equivalent to the market prices of materials and labor based on the standards and the specific characteristics of the works without any deduction or depreciation or value of salvaged materials. (ii) Combining land acquisition and resettlement activities with construction schedule: The land clearance and resettlement for any project must be completed before approving any contract award for that project. (iii) Creating favorable conditions for economic assistance and livelihood restoration support under the Project’s policies. (iv) General consultation and information on compensation policy: a) Affected households must be informed and consulted fully on the land clearance and resettlement. b) The monitoring team must attend the public consultation meetings at least once a month to monitor the implementation of the consultation procedures and problems that occurs and to propose solutions. c) The public awareness about the compensation and entitlement policy will be assessed among affected households. d) The assessment of the awareness of the different options were prepared for the affected households and outlined in the land acquisition and resettlement action plan. (v) Restoring production: affected people must be monitored for their production restoration to ensure that this process satisfies them. (vi) The affected households’ level of satisfaction with many different aspects of the land acquisition and resettlement action plan: This work will be evaluated, reviewed and recorded and the grievance redress mechanism and the speed of the compensation redress will be monitored, too. (vii) The trend in living conditions: During the implementation, this trend will be monitored and surveyed with special note to any differences by gender or ethnicity; any potential problems during the living restoration support must be reported. (viii) Monitor and provide advice on the prevention of potential risks posed by labor influx into the communities surrounding the project area (i.e. the people living or working in the communes immediately adjacent to the project site) during construction; Page 98 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province (ix) Monitor and provide advice on the adequate protection of construction workers’ safety at the construction site and the implementation of good work-place safety practices during construction; (x) Monitor and provide advice on the adequate implementation of the project’s Grievance Redress Mechanism (GRM); and to identify problems or potential problems and recommend remidies for problems.. IV. Monitoring method 6. The methods of independent monitoring of RAP should be implemented by combination of the quantitative and qualitative methods, community meetings, focused group discussion, in- depth interview and sample survey. Sample size for each monitoring round may be 100% of relocated households and severely affected households and at least 20% of the remaining affected households. The surveys should cover women, the elderly and other vulnerable groups on the basis of gender equality. V. Completion progress and reporting 7. Independent monitoring consultant must submit the report every 6 month and reflect all findings during the monitoring. The monitoring reports will be submitted to the PMU, then the PMU will submit to the WB. The independent monitoring reports include as follows: - Inception report - Periodical reports - Final report VI. Compositions of Consultant Team and Requirements for Qualifications and Experiences a) Requirements for qualification and experience of key personnel for each Subproject No. Personnel Minimum qualification and experience 1 Team Leader Team Leader has bachelor’s degree in the fields related to social sciences (Resettlement expert ) (economics, sociology, land management ...) , has experience working more than 15 years since graduation, experimental leader of consultants (National expert) for 03 independent monitoring consultancy packages on compensation, assistance and resettlement for projects funded by international donors. 2 Social experts Social experts have bachelor’s degree in the fields of social sciences (economics, sociology, land management, etc), at least 5 year working (National expert) experience in resettlement. b) Requirements for capacity and experiences of consulting firm - Have working experience in resettlement in ODA projects for at least 05 (five) years. - Have experience in working with government and international organizations. - Have experience in monitoring implementation of RAP for at least 02 (two) ODA projects. Page 99 Dynamic Cities Integrated Development Project – Ky Anh town subproject, Ha Tinh province VII. Monitoring schedule 8. The monitoring is expected to be implemented within a period of 3 years with 06 (six) monitoring missions, starting from Quarter 2 of 2019 and finished at the end of Quarter 2 of 2022. VIII. Client’s responsibilities - Closely coordinate with the Independent Monitoring - Consultant during the Contract performance period. - Provide the Independent Monitoring Consultant with documents related to compensation and site clearance of the project. - Manage Consulting Service Contract - Arrange verification, acceptance and submission of outputs fully and timely. This TOR will be updated by the PMU and cleared by the WB before advertising for recruitment. Page 100