Sample Procurement Plan Sample Procurement Plan I. General 1. Project Information Project Name: enter Project Name here Country: enter Country Here Project ID: enter Project ID here Loan/Credit Numbers: enter Loan/Credit Number here 2. Bank's approval date of Procurement Plan Original: Revision 1: Add new revisions 3. Date of General Procurement Notice II. Goods, Work and Non-Consulting Services Thresholds 1. Prior Review Threshold. Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Prior Review Threshold 1a. Procurement Category (USD) CVDB Goods 3,000,000 Works First Contract Non-Consultant Services First Contract Municipalities Shopping and direct contract Not Applicable YWC Not Applicable Include all categories authorized by the loan agreement Procurement Method 1b. Procurement Method Threshold (USD) ICB and LIB (Goods) No threshold NCB (Goods) 1,000,000 Shopping (Goods) 200,000 ICB (Works) NA NCB (Works) No threshold Shopping (Works) 300,000 ICB (Non-Consultant Services) NA Include all methods authorized by the loan agreement 2. Prequalification. Bidders for __N.A._______ shall be prequlified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph 3.17 of the Guidelines): Refer to the relevant CDD project implementation document approved by the Bank 4. Reference to (if any) Project Operational/Procurement Manual: 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable 6. Procurement Packages with Methods and Time Schedule: See attached "Goods and Works" sheet III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Prior Review Threshold 1a. Procurement Category (USD) Consulting Firms (Competitive) 1,000,000 Consulting Firms (Sole Source) All Individual Consultants (Competitive) 300,000 Individual Consultants (Sole Source) All Include all categories authorized by the loan agreement Procurement Method 1b. Procurement Method Threshold (USD) QCBS No threshold QBS 300,000 FBS 300,000 LCS 300,000 CQS 300,000 Consulting Firms (Sole Source) No threshold Individual Consultants (Competitive) No threshold Individual Consultants (Sole Source) No threshold Include all methods authorized by the loan agreement 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 300,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. Note: OPCPR list of ceilings can be found here: http://go.worldbank.org/MKXO98RY40 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule: See attached "Consulting Services" sheet IV. Implementing Agency Capacity Building Activities with Time Schedule: See attached "Capacity Building" sheet ement Plan Amended article No 45 municipal law ement Plan AWARD RECOMMENDATION AT MUNICIPALITY Shopping Department Bidding Department Bidding Department /Credit Number here Prior Review by the Bank as stated in Appendix 1 to ocurement methods (not limited to the list below) will ccredited Staff based on the assessment of the Comments Post review Post review Comments ied in accordance with the provisions of paragraphs aph 3.17 of the Guidelines): Refer to the relevant nual: advance procurement and retroactive financing, if See attached "Goods and Works" sheet Review by Bank as stated in Appendix 1 to the Comments Needs assessment and Auditors shall also be subject to prior review. Comments rt list of consultants for services, estimated to cost tirely of national consultants in accordance with the orldbank.org/MKXO98RY40 ance procurement and retroactive financing, if me Schedule: See attached "Consulting Services" e Schedule: See attached "Capacity Building" sheet icle No 45 municipal law THRESHOLDS in JOD VALIDATION Municipality categories AUTHORITY Category 1 Category 2 Category 3 Municipal Council 5,000 - 15,000 3,000 - 10,000 2,000 - 5,000 Municipal Council 15,000 - 100,00 10,000 - 75,00 5,000 - 50,00 MOMA Minister >100,000 >75,000 >50,000 ESSRP 2 A ‫وصÙ? العمل‬ Plan/ Actual Proc. System Ref. # Comp Location/ Description Municipality Sl. # 34 P ESSRP.F15.M.W.37 1 Playground ‫ملعب خماسي‬ Ma'an A 34 P 1 Playground Fecning ‫سياج ملعب‬ Ma'an A 35 P ESSRP.F15.M.W.38 2015 ‫قاعة اجتماعات‬ 1 Meeting Hall of Ma'an A 49 P ESSRP.F15.M..W.38 1 Emergency ‫انشطة مختلÙ?ة‬ Ma'an A Expenses ESSRP 2 A ‫وصÙ? العمل‬ Plan/ Actual Proc. System Ref. # Comp Location/ Description Municipality Sl. # ESSRP NCB PO 0 0 0 0 ‫ اسم البلدية‬Mun. Interval Interval Interval Interval Quantity WB Review Submission/ NOL Date Invitation Date Bid Opening Proc. Method (PR/PO) Readiness Date Date SH PO 25-Jun-15 25-Jun-15 8 11-Sep-15 28 09-Oct-15 15 13 ‫معان‬ 0 42258 11-Sep-15 45 26-Oct-15 -42303 13 SH PO 01-Nov-17 01-Nov-17 8 09-Nov-17 28 07-Dec-17 15 13 ‫معان‬ 0 13 13 1 SH PO 0 00-Jan-00 15 02-Jun-16 7 09-Jun-16 15 ‫معان‬ ############## 0 ###################### 13-Oct-15 13 ‫معان‬ 13 SH PO 25-Jun-15 25-Jun-15 8 03-Jul-15 28 31-Jul-15 15 0 0 0 0 13 ESSRP NCB PO 0 0 0 0 ‫ اسم البلدية‬Mun. Interval Interval Interval Interval Quantity WB Review Submission/ NOL Date Invitation Date Bid Opening Proc. Method (PR/PO) Readiness Date Date ESSRP 0 0 0 0 Interval Interval Interval Evaluation & NOL Date Contract Start Date Completion Physical Last Execution Execution Recomm. Award Date Date Completi Revised (mths) (days) on Ratio Completio n Date 24-Oct-15 24-Oct-15 5 29-Oct-15 4 02-Nov-15 0 0.0 02-Nov-15 0% 0 ### 13-Dec-15 41 23-Jan-16 0.0 23-Jan-16 22-Dec-17 22-Dec-17 5 27-Dec-17 4 31-Dec-17 14 0.5 14-Jan-18 0% 24-Jun-16 7 01-Jul-16 15 16-Jul-16 10 26-Jul-16 160 01-Jul-16 0 13-Dec-15 41 23-Jan-16 160 15-Aug-15 15-Aug-15 5 20-Aug-15 4 24-Aug-15 300 9.8 19-Jun-16 0% 0 0 0 0.0 00-Jan-00 ESSRP 0 0 0 0 Interval Interval Interval Evaluation & NOL Date Contract Start Date Completion Physical Last Execution Execution Recomm. Award Date Date Completi Revised (mths) (days) on Ratio Completio n Date 2 A ESSRP NCB PO 0 0 Goods Municipality 0 0 0 0 0 0 ‫وصÙ? العمل‬ ‫اسم البلدية‬ Actual Interval Interval Interval Interval Interval Interval Interval Proc. System Ref. # Com Location/ Description Municipality Mun. Quantity WB Submission/ NOL Date Invitation Date Bid Opening Date Evaluation & NOL Date Contract Award Start Date Completion Date Physical Last Contractor Plan/ Execution Execution Method (days) (mths) p Review Readiness Date Recomm. Date Complet Revised Proc. Sl. # (PR/PO) ion Ratio Completio n Date 1 P ESSRP.F15.M.G.01 1 Light Units ‫وحدات انارة‬ #REF! #REF! 1 1000 SH PO 15-Jun-15 15-Jun-15 8 02-Oct-15 28 30-Oct-15 15 14-Nov-15 14-Nov-15 5 19-Nov-15 4 23-Nov-15 60 1.96721 22-Jan-16 alshoaá Cpmpany A 1 25-Sep-15 ##### 42279 02-Oct-15 44 15-Nov-15 #### 0 ### 31-Dec-15 7 07-Jan-16 60 07-Mar-16 2 P ESSRP.F15.M.G.02 1 Insecticides and ‫المبيدات الحشرية‬ #REF! #REF! 1 SH PO 15-Jun-15 15-Jun-15 8 23-Jun-15 28 21-Jul-15 15 05-Aug-15 05-Aug-15 5 10-Aug-15 4 14-Oct-15 20 0.65574 03-Nov-15 vicoMobedcoaqro A 1 16-Jul-15 ##### 42208 23-Jul-15 14 06-Aug-15 #### 0 ### 20-Sep-15 24 14-Oct-15 20 03-Nov-15 Pesticides ‫ومبيدات اآلÙ?ات‬ 3 P ESSRP.F15.M.G.03 1 Pavement Paint ‫دهان األرصÙ?ة‬ #REF! #REF! 1 SH PO 15-Jun-15 15 30-Jun-15 8 13-Jul-15 28 10-Aug-15 15 25-Aug-15 15 09-Sep-15 5 14-Sep-15 4 22-Oct-15 60 1.96721 21-Dec-15 A 1 06-Jul-15 ##### 42198 13-Jul-15 38 20-Aug-15 #### 0 ### 29-Sep-15 23 22-Oct-15 60 21-Dec-15 4 P ESSRP.F15.M.G.04 1 pesticides sprayer motor ‫اجهزة رذاذ رش مبيدات‬ #REF! #REF! 1 5 SH PO 15-Jun-15 15 30-Jun-15 8 13-Jul-15 28 10-Aug-15 15 25-Aug-15 25-Aug-15 5 30-Aug-15 4 05-Nov-16 60 1.96721 04-Jan-17 Telfah Company A 1 06-Jul-15 ##### 42198 13-Jul-15 17 30-Jul-15 #### 0 ### 09-Jul-15 485 05-Nov-16 60 03-Mar-16 ‫حشرية‬ 5 P ESSRP.F15.M.G.05 1 Pick Up Double Cabin ‫سيارة بكب اب كابينة‬ Irbid #REF! 1 8 SH PO 15-Jun-15 15 15-Jul-15 8 07-Jul-15 28 04-Aug-15 15 19-Aug-15 19-Aug-15 7 26-Aug-15 5 27-Dec-15 60 1.96721 25-Feb-16 Alqudra Vehicles trading Company A 1 30-Jun-15 ##### 42192 07-Jul-15 -4 03-Jul-15 #### 0 ### 17-Sep-15 42365 27-Dec-15 60 26-Mar-16 ‫مزدوجة‬ 6 P ESSRP.F15.M.G.06 1 Purchase of hearse ‫باص نقل موتى‬ Irbid #REF! 1 4 SH PO 15-Jun-15 15 30-Jun-15 8 13-Jul-15 28 10-Aug-15 15 25-Aug-15 25-Aug-15 7 01-Sep-15 5 20-Jan-16 20 0.65574 09-Feb-16 Abu Zakieh for vehicles trading A 1 06-Jul-15 ##### 13-Jul-15 -6 07-Jul-15 #### 0 ### 10-Sep-15 42389 20-Jan-16 20 09-Feb-16 Vehicle 7 P ESSRP.F15.M.G.07 1 water Tank ( 30 m3 3‫م‬30 ‫صهريج مياه سعة‬ Irbid #REF! 1 1 SH PO 26-May-15 15 10-Jun-15 8 18-Jun-15 28 16-Jul-15 15 31-Jul-15 31-Jul-15 7 07-Aug-15 5 28-Dec-16 180 5.90164 26-Jun-17 Alqudra Vehicles trading Company A 1 11-Aug-15 18-Aug-15 -36 13-Jul-15 05-Dec-15 28-Dec-16 180 Capacity ) 8 P ESSRP.F15.M.G.08 1 Electricity crane ‫راÙ?عة كهرباء‬ Irbid #REF! 1 1 SH PO 15-Jun-15 15 30-Jun-15 8 25-Jun-15 28 23-Jul-15 15 07-Aug-15 07-Aug-15 7 14-Aug-15 5 22-Oct-15 150 4.91803 20-Mar-16 Universal Equipment Co. A 1 18-Jun-15 25-Jun-15 14 09-Jul-15 22-Oct-15 22-Oct-15 150 20-Mar-16 9 P ESSRP.F15.M.G.09 1 Long Hase Pick ups ‫بكب شاصي طويل‬ Irbid #REF! 1 4 SH PO 15-Jun-15 15 30-Jun-15 8 08-Jul-15 28 05-Aug-15 15 20-Aug-15 20-Aug-15 7 27-Aug-15 5 01-Sep-15 90 2.95082 30-Nov-15 A 1 30-Jun-15 07-Jul-15 16 23-Jul-15 #### 90 15-Nov-15 15-Nov-15 90 07-Jan-16 10 ESSRP.F15.M.G.10 Containers l ‫توريد حاويات‬ 28 P 2 15-Jun-15 15-Jun-15 8 23-Jun-15 21-Jul-15 15 05-Aug-15 05-Aug-15 5 10-Aug-15 4 01-Jul-15 9 0.29508 10-Jul-15 Raafat Koraan 1 #REF! #REF! 45 SH PO 16-Jun-15 A 2 ##### 42178 23-Jun-15 7 30-Jun-15 #### 0 ### 30-Jun-15 1 01-Jul-15 9 10-Jul-15 11 P ESSRP.F15.M.G.11 1 Kanderin Stone Material ‫مواد مصنع حجر الكندرين‬ #REF! #REF! 2 SH PO 15-Jun-15 15-Jun-15 8 01-Jul-15 28 29-Jul-15 15 13-Aug-15 13-Aug-15 5 18-Aug-15 4 17-Aug-15 60 1.96721 16-Oct-15 Abdallah Zoobi A 2 24-Jun-15 ##### 42186 01-Jul-15 29 30-Jul-15 #### 0 ### 16-Aug-15 1 17-Aug-15 60 16-Oct-15 12 P ESSRP.F15.M.G.12 1 Light Units ‫وحدات انارة‬ #REF! #REF! 2 150 SH PO 15-Jun-15 15-Jun-15 8 23-Jun-15 28 21-Jul-15 15 05-Aug-15 05-Aug-15 5 10-Aug-15 4 26-Jun-15 4 0.13115 30-Jun-15 Seif For lighting A 2 11-Jun-15 ##### 42173 18-Jun-15 7 25-Jun-15 #### 0 ### 25-Jun-15 1 26-Jun-15 4 30-Jun-15 13 P ESSRP.F15.M.G.13 1 Suppluing Basecoarse ‫توريد مواد Ù?رشيات‬ #REF! #REF! 3 1 SH PO 01-Aug-15 01-Aug-15 8 09-Aug-15 28 06-Sep-15 15 21-Sep-15 21-Sep-15 5 26-Sep-15 4 24-Aug-15 15 0.4918 08-Sep-15 Sadeq Hussein ‫للشوارع‬ A 3 29-Jul-15 05-Aug-15 10-Aug-15 10-Aug-15 24-Aug-15 15 08-Sep-15 14 P ESSRP.F15.M.G.14 1 Kendrine Stones #REF! #REF! 3 1 SH PO 01-Aug-15 01-Aug-15 8 09-Aug-15 28 06-Sep-15 15 21-Sep-15 21-Sep-15 5 26-Sep-15 4 10-Oct-15 15 0.4918 25-Oct-15 Haider Daqamsheh ‫توريد مواد حجر كندرين‬ Materials A 3 20-Aug-15 27-Aug-15 01-Sep-15 07-Sep-15 10-Oct-15 15 25-Oct-15 15 P ESSRP.F15.M.G.15 1 Pick Up Double Cabin ‫سيارة بكب اب كابينة‬ Sahel Horan #REF! 4 1 SH PO 15-Jun-15 15 18-Sep-15 8 26-Sep-15 28 24-Oct-15 15 08-Nov-15 08-Nov-15 7 15-Nov-15 5 31-Jan-16 90 2.95082 30-Apr-16 Azzuro A 4 03-Sep-15 ##### 42257 10-Sep-15 104 23-Dec-15 #### 0 ### 21-Jan-16 42400 31-Jan-16 90 08-May-16 ‫مزدوجة‬ 16 P ESSRP.F15.M.G.16 1 Compactors ( 18 m3 )3‫ م‬18 ‫ضاغطات (سعة‬ #REF! #REF! 5 1 SH PO 00-Jan-00 8 08-Jan-00 28 05-Feb-00 15 20-Feb-00 20-Feb-00 5 25-Feb-00 4 10-Apr-16 90 4.91803 09-Jul-16 MAN A Capacity ) 5 16-Dec-15 0 0 23-Dec-15 0 03-Jan-16 0 0 0 31-Mar-16 0 10-Apr-16 90 17-Aug-16 17 P ESSRP.F15.M.G.17 1 Pick Up Double Cabin ‫سيارة بكب اب كابينة‬ Al Mafraq #REF! 5 2 SH PO 15-Jun-15 15 15-Jun-15 8 23-Jun-15 28 21-Jul-15 15 05-Aug-15 05-Aug-15 7 14-Dec-15 5 29-Dec-15 90 2.95082 28-Mar-16 Mitsubishi A ‫مزدوجة‬ 5 31-May-15 ##### 42162 07-Jun-15 10 17-Jun-15 #### 0 ### 14-Dec-15 42367 29-Dec-15 90 21-Jan-16 18 P ESSRP.F15.M.G.18 1 Streets sweeper ‫كانسات شوارع‬ Al Mafraq #REF! 5 1 SH PO 15-Jun-15 15 8 18-May-15 28 15-Jun-15 15 30-Jun-15 30-Jun-15 7 07-Jul-15 5 12-Jul-15 90 2.95082 10-Oct-15 Alquds A 5 11-Oct-15 18-Oct-15 29-Oct-15 08-Feb-16 11-Feb-16 90 17-Aug-16 19 P ESSRP.F15.M.G.19 1 Trucks ( 10 ton Capacity ) )‫ طن‬10 ‫قالبات ( سعة‬ Al Mafraq #REF! 5 2 SH PO 15-Jun-15 15 30-Jun-15 8 08-Jul-15 28 05-Aug-15 15 20-Aug-15 20-Aug-15 7 27-Aug-15 5 01-Sep-15 90 2.95082 30-Nov-15 Universal Equip. Company A 5 31-May-15 ##### 42162 07-Jun-15 40 17-Jul-15 #### 0 ### 21-Feb-16 42422 22-Feb-16 90 17-Aug-16 20 P ESSRP.F15.M.G.20 1 Construction Equipment ‫معدات انشائية (لودر‬ Al Mafraq #REF! 5 2 SH PO 15-Jun-15 15 30-Jun-15 8 08-Jul-15 28 05-Aug-15 15 20-Aug-15 20-Aug-15 7 27-Aug-15 5 01-Sep-15 90 2.95082 30-Nov-15 CAT (loader 12.5+loader ‫باكو‬+17.5 ‫لودر‬+12.5 A 5 11-Oct-15 18-Oct-15 07-Jun-15 24-Jan-16 04-Feb-16 90 17-Aug-16 17.5+backhoe loader) )‫لودر‬ 21 P ESSRP.F15.M.G.21 1 Electricity crane ‫راÙ?عة كهرباء‬ Al Mafraq #REF! 5 1 SH PO 15-Jun-15 15 30-Jun-15 8 07-Jun-15 28 05-Jul-15 15 20-Jul-15 20-Jul-15 7 06-Jan-16 5 11-Jan-16 90 2.95082 10-Apr-16 Tawfeeq Gharghour A 5 31-May-15 07-Jun-15 23-Aug-15 06-Jan-16 14-Jan-16 90 17-Aug-16 22 P ESSRP.F15.M.G.22 1 Refrigerated vehicles ‫سيارة مبردة لنقل اللحوم‬ Al Mafraq #REF! 5 1 SH PO 15-Jun-15 15 30-Jun-15 8 08-Jul-15 28 05-Aug-15 15 20-Aug-15 15 04-Sep-15 5 09-Sep-15 4 31-Mar-16 150 4.91803 28-Aug-16 Turkish Jordanian A 5 31-May-15 07-Jun-15 17-Jul-15 31-Mar-16 31-Mar-16 150 23 1 electricity Generator and ‫مقص زÙ?تة Ùˆ مولد كهرباء‬ 1 SH PO P ESSRP.F15.M.G.22 Al Mafraq #REF! 5 15-Jun-15 15 30-Jun-15 8 08-Jul-15 28 05-Aug-15 15 20-Aug-15 15 04-Sep-15 5 09-Sep-15 4 17-Sep-16 150 4.91803 14-Feb-17 Ramadan company A 5 01-Sep-16 05-Sep-16 12-Sep-16 17-Sep-16 17-Sep-16 30 05-Oct-16 Asphalt scissors 24 P ESSRP.F15.M.G.23 1 Pick Up Double Cabin ‫سيارة بكب اب كابينة‬ #REF! #REF! 6 2 SH PO 15-Jun-15 15 17-Jul-15 8 25-Jul-15 28 22-Aug-15 15 06-Sep-15 06-Sep-15 7 13-Sep-15 5 30-Sep-15 60 1.96721 29-Nov-15 Mitsubishi A 6 02-Jul-15 ##### 42194 09-Jul-15 25 03-Aug-15 #### 0 ### 20-Sep-15 42277 30-Sep-15 60 20-Apr-16 ‫مزدوجة‬ 25 P ESSRP.F15.M.G.24 1 Containers ‫حاويات Ù†Ù?ايات‬ #REF! #REF! 6 150 SH PO 15-Jun-15 15-Jun-15 8 23-Jun-15 28 21-Jul-15 15 05-Aug-15 05-Aug-15 5 10-Aug-15 4 21-Nov-15 60 1.96721 20-Jan-16 Alaáraida A 6 09-Jul-15 ##### 42201 16-Jul-15 27 12-Aug-15 #### 0 ### 30-Oct-15 22 21-Nov-15 60 19-Apr-16 26 P ESSRP.F15.M.G.25 1 Steel-Wheel Roller 5T )‫طن‬5( ‫ مداحل‬New Bal'ama #REF! 6 1 SH PO 15-Jun-15 15 30-Jun-15 8 08-Jul-15 28 05-Aug-15 15 20-Aug-15 20-Aug-15 7 27-Aug-15 5 20-Apr-16 120 3.93443 18-Aug-16 ATCO 2 A ESSRP NCB PO 0 0 Goods Municipality 0 0 0 0 0 0 ‫وصÙ? العمل‬ ‫اسم البلدية‬ Actual Interval Interval Interval Interval Interval Interval Interval Proc. System Ref. # Com Location/ Description Municipality Mun. Quantity WB Submission/ NOL Date Invitation Date Bid Opening Date Evaluation & NOL Date Contract Award Start Date Completion Date Physical Last Contractor Plan/ Execution Execution Method (days) (mths) p Review Readiness Date Recomm. Date Complet Revised Proc. Sl. # 26 1 Steel-Wheel Roller 5T )‫طن‬5( ‫مداحل‬ 1 SH PO (PR/PO) ion Ratio Completio n Date A 6 02-Jul-15 09-Jul-15 03-Aug-15 05-Apr-16 20-Apr-16 120 27 P ESSRP.F15.M.G.26 1 Pick Up Double Cabin ‫سيارة بكب اب كابينة‬ Sarhan #REF! 7 1 SH PO 15-Jun-15 15 23-Jun-15 8 01-Jul-15 28 29-Jul-15 15 13-Aug-15 13-Aug-15 7 20-Aug-15 5 26-Oct-15 90 2.95082 24-Jan-16 Ford A 7 08-Jun-15 ##### 42170 15-Jun-15 14 29-Jun-15 #### 0 ### 12-Oct-15 42303 26-Oct-15 90 24-Jan-16 ‫مزدوجة‬ 28 P ESSRP.F15.M.G.27 1 Pick Up Double Cabin ‫سيارة بكب اب كابينة‬ Hosha #REF! 9 1 SH PO 15-Jun-15 15 11-Oct-15 8 19-Oct-15 28 16-Nov-15 15 01-Dec-15 01-Dec-15 7 08-Dec-15 5 11-Jan-16 20 0.65574 31-Jan-16 Mitsubishi A 9 26-Sep-15 ##### 42280 03-Oct-15 08-Oct-15 #### 0 ### 20-Oct-15 42380 11-Jan-16 20 20-Jan-16 ‫مزدوجة‬ 29 P ESSRP.F15.M.G.28 1 Pick Up Double Cabin ‫سيارة بكب اب كابينة‬ Hosha #REF! 9 1 SH PO 15-Jun-15 15 24-Jul-15 8 01-Aug-15 28 29-Aug-15 15 13-Sep-15 13-Sep-15 7 20-Sep-15 5 07-Sep-15 30 0.98361 07-Oct-15 Mitsubishi A 9 09-Jul-15 ##### 16-Jul-15 28-Jul-15 28-Jul-15 07-Sep-15 30 20-Jan-16 ‫مزدوجة‬ 1 P ESSRP.F15.M.G.29 1 Compactors ( 18 m3 )3‫ م‬18 ‫ضاغطات (سعة‬ #REF! #REF! 10 1 SH PO 00-Jan-00 8 17-Sep-15 28 15-Oct-15 15 30-Oct-15 30-Oct-15 5 04-Nov-15 4 19-Oct-15 150 4.91803 17-Mar-16 jamal alasbah A 10 10-Sep-15 -24 17-Aug-15 31 17-Sep-15 #### 0 ### 19-Oct-15 0 19-Oct-15 150 17-Mar-16 Capacity ) 2 P ESSRP.F15.M.G.30 1 Electricity crane ‫راÙ?عة كهرباء‬ Sahab #REF! 10 1 SH PO 15-Jun-15 15 30-Jun-15 8 07-Sep-15 28 05-Oct-15 15 20-Oct-15 15 04-Nov-15 5 09-Nov-15 4 13-Nov-15 150 4.91803 06-Jun-16 Turkish Jordanian for vehicle trading 08-Jan-16 A 10 31-Aug-15 #REF! 42254 07-Sep-15 14-Sep-15 #### 0 ### 07-Jan-16 1 150 19-May-16 3 P ESSRP.F15.M.G.31 1 Light Units ‫وحدات انارة‬ #REF! #REF! 10 250 SH PO 15-Jun-15 15-Jun-15 8 23-Jun-15 28 21-Jul-15 15 05-Aug-15 05-Aug-15 5 10-Aug-15 4 27-Jul-15 60 1.96721 25-Sep-15 Najmeh Enterprise A 10 25-May-15 ##### 42156 01-Jun-15 7 08-Jun-15 #### 0 ### 04-Jul-15 23 27-Jul-15 60 25-Sep-15 4 P ESSRP.F15.M.G.32 1 Pick Up Double Cabin ‫سيارة بكب اب كابينة‬ Sahab #REF! 10 1 SH PO 15-Jun-15 15 15-Sep-15 8 23-Sep-15 28 21-Oct-15 15 05-Nov-15 05-Nov-15 7 12-Nov-15 5 19-Oct-15 20 0.65574 08-Nov-15 Mitsubishi‫التجارية االردنية‬ A 10 31-Aug-15 ##### 42254 07-Sep-15 14-Sep-15 #### 0 ### 14-Sep-15 42296 19-Oct-15 20 08-Nov-15 ‫مزدوجة‬ 5 P ESSRP.F15.M.G.33 1 Trucks ( 10 ton Capacity ) )‫ طن‬10 ‫قالبات ( سعة‬ Sahab #REF! 10 1 SH PO 15-Jun-15 15 07-Jul-15 8 15-Jul-15 28 12-Aug-15 15 27-Aug-15 27-Aug-15 7 03-Sep-15 5 08-Sep-15 150 4.91803 05-Feb-16 Universal Equipment Co. A 10 22-Jun-15 ##### 42184 29-Jun-15 36 04-Aug-15 #### 0 ### 23-Dec-15 42376 07-Jan-16 150 6 P ESSRP.F15.M.G.34 1 Spraying Motor ‫ماتور رش‬ #REF! #REF! 10 1 SH PO 15-Jun-15 15-Jun-15 8 23-Jun-15 28 21-Jul-15 15 05-Aug-15 05-Aug-15 5 10-Aug-15 4 12-Sep-15 90 2.95082 11-Dec-15 alfalaq company A 10 04-Aug-15 ##### 42227 11-Aug-15 7 18-Aug-15 #### 0 ### 18-Aug-15 25 12-Sep-15 90 11-Dec-15 7 P ESSRP.F15.M.G.35 1 Skid Loader 2.5 ton ‫سكد لودر‬ #REF! #REF! 10 1 SH PO 15-Jun-15 15 30-Jun-15 8 08-Jul-15 28 05-Aug-15 15 20-Aug-15 20-Aug-15 7 27-Aug-15 5 18-Jan-16 90 2.95082 17-Apr-16 CAT A 10 22-Jun-15 ##### 42184 29-Jun-15 36 04-Aug-15 #### 0 ### 10-Sep-15 42387 18-Jan-16 90 17-Apr-16 8 ESSRP.F15.M.G.36 1 Tipper Trucks ( 2.5-3.5 -2.5 ‫قالبات جك ( سعة‬ #REF! #REF! 10 1 SH PO 15-Jun-15 15 30-Jun-15 8 08-Jul-15 28 05-Aug-15 15 20-Aug-15 20-Aug-15 7 27-Aug-15 5 26-Jan-16 90 2.95082 25-Apr-16 Motors vehicle trading company A 10 24-Aug-15 ##### 42247 31-Aug-15 10 10-Sep-15 #### 0 ### 28-Dec-16 #REF! 26-Jan-16 90 25-Apr-16 ton Capacity ) )‫ طن‬3.5 9 P ESSRP.F15.M.G.37 1 Cargo Trucks ( 2.5-3.5 -2.5 ‫قالبات ثابتة ( سعة‬ #REF! #REF! 10 1 SH PO 15-Jun-15 15 30-Jun-15 8 08-Jul-15 28 05-Aug-15 15 20-Aug-15 7 07-Jan-00 7 26-Jan-16 60 1.96721 26-Mar-16 Motors vehicle trading company A 10 24-Aug-15 ##### 42247 31-Aug-15 10 10-Sep-15 #### 0 ### 28-Dec-16 #REF! 26-Jan-16 60 26-Mar-16 ton Capacity ) )‫ طن‬3.5 10 P ESSRP.F15.M.G.38 1 Light Units ‫وحدات انارة‬ #REF! #REF! 10 60 SH PO 01-Jan-16 15 16-Jan-16 8 24-Jan-16 28 21-Feb-16 15 07-Mar-16 7 07-Jan-00 7 10-Mar-16 1 0.03279 11-Mar-16 Najmet Almostaqba A 10 23-Jan-16 30-Jan-16 10-Mar-16 10-Mar-16 10-Mar-16 1 11-Mar-16 11 P ESSRP.F15.M.G.39 1 Contatiners ‫حاويات‬ #REF! #REF! 10 70 SH PO 01-Dec-16 15 16-Dec-16 8 24-Dec-16 28 21-Jan-17 15 05-Feb-17 7 07-Jan-00 7 15-Jan-16 150 4.91803 13-Jun-16 Ra'afat Quea'an A 10 06-Dec-15 13-Dec-15 15-Jan-16 15-Jan-16 15-Jan-16 14-Feb-16 12 P ESSRP.F15.M.G.40 1 Mamual Concrete Mixer ‫خالطة باطون‬ #REF! #REF! 10 1 SH PO 01-Aug-16 15 16-Aug-16 8 24-Aug-16 28 21-Sep-16 15 06-Oct-16 7 13-Oct-16 7 04-Sep-16 150 4.91803 01-Feb-17 hassan abu safi A 10 ############ 03-Sep-16 04-Sep-16 04-Sep-16 1 05-Sep-16 13 ESSRP.F15.M.G.41 Facilities for disabled ‫تسهيالت بيئية لذوي‬ #REF! #REF! 10 1 SH PO 01-Aug-16 15 16-Aug-16 8 24-Aug-16 28 21-Sep-16 15 06-Oct-16 7 13-Oct-16 7 24-Sep-16 150 4.91803 21-Feb-17 mohammad sobha 10 ############ 03-Sep-16 07-Sep-16 24-Sep-16 14 08-Oct-16 people ‫االحتياجات الخاصة‬ 14 ESSRP.F15.M.G.42 Decorative trees to ‫تزيين شوارع بأشجار‬ #REF! #REF! 10 1 SH PO 01-Aug-16 15 16-Aug-16 8 24-Aug-16 28 21-Sep-16 15 06-Oct-16 7 13-Oct-16 7 04-Sep-16 150 4.91803 01-Feb-17 belal farming 10 ############ 03-Sep-16 04-Sep-16 04-Sep-16 1 05-Sep-16 streets ‫الزينة‬ 15 ESSRP.F15.M.G.43 Parks Rehalibitaion ‫تأهيل الحديقة‬ #REF! #REF! 10 1 SH PO 01-Aug-16 15 16-Aug-16 8 24-Aug-16 28 21-Sep-16 15 06-Oct-16 7 13-Oct-16 7 00-Jan-00 150 4.91803 29-May-00 Classic furniture 10 ############ 22-Sep-16 05-Jan-17 14 17-Jan-17 16 ESSRP.F15.M.G.44 wheels Repairing ‫معدات بناشر‬ #REF! #REF! 10 1 SH PO 01-Aug-16 15 16-Aug-16 8 24-Aug-16 28 21-Sep-16 15 06-Oct-16 7 13-Oct-16 7 12-Oct-16 150 4.91803 11-Mar-17 Albashiti/Alhzayyen 10 ############ 12-Oct-16 12-Oct-16 12-Oct-16 6 18-Oct-16 Equipments 17 ESSRP.F15.M.G.45 Paints for Buildings ‫دهان تجميل المدينة‬ #REF! #REF! 10 1 SH PO 01-Aug-16 15 16-Aug-16 8 24-Aug-16 28 21-Sep-16 15 06-Oct-16 7 13-Oct-16 7 25-Aug-16 150 4.91803 22-Jan-17 saleh dmeiri 10 ############ 25-Aug-16 25-Aug-16 ####### 31-Aug-16 18 ESSRP.F15.M.G.46 trees ‫تزيين شوارع بأشجار‬ #REF! #REF! 10 1 SH PO 01-Aug-16 15 16-Aug-16 8 24-Aug-16 28 21-Sep-16 15 06-Oct-16 7 13-Oct-16 7 00-Jan-00 150 4.91803 29-May-00 10 ############ ‫الزينة‬ 19 ESSRP.F15.M.G.47 cleaning ‫إزاله انقاذ‬ #REF! #REF! 10 1 SH PO 01-Aug-16 15 16-Aug-16 8 24-Aug-16 28 21-Sep-16 15 06-Oct-16 7 13-Oct-16 7 22-Jul-17 150 4.91803 19-Dec-17 Mohammad Abu Sameih 10 ############ 09-Feb-17 12-Feb-17 22-Jul-17 1 23-Jul-17 20 P ESSRP.F15.M.G.39 1 Contatiners ‫حاويات‬ #REF! #REF! 10 SH PO 01-Dec-16 15 16-Dec-16 8 24-Dec-16 28 21-Jan-17 15 05-Feb-17 7 07-Jan-00 7 06-Oct-16 150 4.91803 05-Mar-17 Ra'afat Quea'an A 10 28-Aug-16 04-Sep-16 18-Sep-16 24-Sep-16 06-Oct-16 30 15-Nov-16 21 ESSRP.F15.M.G.48 Curbes Materials ‫شراء حجر كندرين‬ #REF! #REF! 10 1 SH PO 01-Aug-16 15 16-Aug-16 8 24-Aug-16 28 21-Sep-16 15 06-Oct-16 7 13-Oct-16 7 28-Aug-16 150 4.91803 25-Jan-17 Asas For concrete manufacturing 10 03-Aug-16 10-Aug-16 25-Aug-16 28-Aug-16 28-Aug-16 5 05-Sep-16 22 ESSRP.F15.M.G.49 Municipality Library ‫تأهيل مكتبة البلدية‬ #REF! #REF! 10 1 SH PO 01-Aug-16 15 16-Aug-16 8 24-Aug-16 28 21-Sep-16 15 06-Oct-16 7 13-Oct-16 7 04-Sep-16 150 4.91803 01-Feb-17 alsafadi furniture 2 A ESSRP NCB PO 0 0 Goods Municipality 0 0 0 0 0 0 ‫وصÙ? العمل‬ ‫اسم البلدية‬ Actual Interval Interval Interval Interval Interval Interval Interval Proc. System Ref. # Com Location/ Description Municipality Mun. Quantity WB Submission/ NOL Date Invitation Date Bid Opening Date Evaluation & NOL Date Contract Award Start Date Completion Date Physical Last Contractor Plan/ Execution Execution Method (days) (mths) p Review Readiness Date Recomm. Date Complet Revised Proc. Sl. # 22 Municipality Library ‫تأهيل مكتبة البلدية‬ 1 SH PO (PR/PO) ion Ratio Completio n Date 10 ############ 03-Sep-16 04-Sep-16 04-Sep-16 1 05-Sep-16 Rehalibitaion 51 P ESSRP.F15.M.G.50 1 Compactors ( 8 m3 3‫ م‬8 ‫ضاغطات سعة‬ #REF! #REF! 11 2 SH PO 15-Jun-15 15-Jun-15 8 23-Jun-15 28 21-Jul-15 15 05-Aug-15 05-Aug-15 5 10-Aug-15 4 14-Aug-15 150 4.91803 11-Jan-16 A 11 23-Jul-15 30-Jul-15 18-Aug-16 08-Dec-15 22-Dec-15 150 07-Aug-16 Capacity ) 52 P ESSRP.F15.M.G.51 1 Containers ‫حاويات معدنية سعة‬ #REF! #REF! 11 150 SH PO 15-Jun-15 15-Jun-15 8 23-Jun-15 28 21-Jul-15 15 05-Aug-15 05-Aug-15 5 10-Aug-15 4 10-Jun-15 30 0.98361 10-Jul-15 Raafat Odwan A 11 19-Apr-15 ##### 42120 26-Apr-15 9 05-May-15 #### 0 ### 31-May-15 10 10-Jun-15 30 20-Jun-15 ‫ لتر‬11000 53 P ESSRP.F15.M.G.52 1 Fumigation Motor ‫ماتور تدخين‬ #REF! #REF! 11 2 SH PO 15-Jun-15 15-Jun-15 8 23-Jun-15 28 21-Jul-15 15 05-Aug-15 05-Aug-15 5 10-Aug-15 4 06-May-15 7 0.22951 13-May-15 Middle east Sterilization Company A 11 11-Feb-15 ##### 42053 18-Feb-15 8 26-Feb-15 #### 0 ### 07-Apr-15 29 06-May-15 7 13-May-15 54 P ESSRP.F15.M.G.53 1 Pick Up Double Cabin ‫سيارة بكب اب كابينة‬ Naour #REF! 11 2 SH PO 15-Jun-15 15 16-Jul-15 8 24-Jul-15 28 21-Aug-15 15 05-Sep-15 05-Sep-15 7 12-Sep-15 5 17-Sep-15 150 4.91803 14-Feb-16 Mitsubishi A 11 01-Jul-15 ##### 42193 08-Jul-15 53 30-Aug-15 #### 0 ### 02-Feb-16 42367 29-Dec-15 10 24-Mar-16 ‫مزدوجة‬ 55 P ESSRP.F15.M.G.54 1 Skid Loader 2.5 ton ‫سكد لودر‬ Naour #REF! 11 1 SH PO 15-Jun-15 15 30-Jun-15 8 08-Jul-15 28 05-Aug-15 15 20-Aug-15 20-Aug-15 7 27-Aug-15 5 01-Sep-15 150 4.91803 29-Jan-16 Aljarrarat A 11 01-Jul-15 ##### 42193 08-Jul-15 53 30-Aug-15 #### 0 ### 01-Feb-16 42401 01-Feb-16 150 02-Mar-16 56 P ESSRP.F15.M.G.55 1 Cargo Trucks ( 2.5-3.5 -2.5 ‫قالبات ثابتة ( سعة‬ Naour #REF! 11 2 SH PO 15-Jun-15 15 30-Jun-15 8 08-Jul-15 28 05-Aug-15 15 20-Aug-15 20-Aug-15 7 27-Aug-15 5 01-Sep-15 150 4.91803 29-Jan-16 Vehicle trading Company A 11 01-Jul-15 ##### 42193 08-Jul-15 53 30-Aug-15 #### 0 ### 02-Feb-16 42330 22-Nov-15 07-Jan-16 ton Capacity ) )‫ طن‬3.5 57 P ESSRP.F15.M.G.56 1 Construction Equipment ‫معدات انشائية (لودر‬ naour #REF! 11 2 SH PO 15-Jun-15 15 30-Jun-15 8 08-Jul-15 28 05-Aug-15 15 20-Aug-15 20-Aug-15 7 27-Aug-15 5 01-Sep-15 150 4.91803 29-Jan-16 Commercial Trading company (loader 12.5+loader ‫باكو‬+17.5 ‫لودر‬+12.5 A 11 01-Jul-15 08-Jul-15 30-Aug-15 02-Feb-16 10 29-Dec-15 24-Mar-16 17.5+backhoe loader) )‫لودر‬ 58 P ESSRP.F15.M.G.83 1 Insecticides and ‫المبيدات الحشرية‬ #REF! #REF! 11 1 SH PO 15-Jun-15 15-Jun-15 8 10-Feb-15 28 10-Mar-15 15 25-Mar-15 25-Mar-15 5 30-Mar-15 4 03-Apr-15 0 03-Apr-15 A 11 03-Feb-15 ##### 42045 10-Feb-15 14 24-Feb-15 0 24-Feb-15 ### ### 07-Apr-15 7 14-Apr-15 1 15-Apr-15 Pesticides 59 P ESSRP.F15.M.G.57 1 Septic Tanks ( 8-10 m3 ‫صهاريج الصرÙ? الصحي‬ Maán #REF! 12 1 SH PO 15-Jun-15 15 30-Jun-15 8 08-Jul-15 28 05-Aug-15 15 20-Aug-15 20-Aug-15 7 27-Aug-15 5 18-Feb-16 150 4.91803 17-Jul-16 Motor Vehicle trading A 12 04-Aug-15 ##### 42227 11-Aug-15 19 30-Aug-15 #### 0 ### 14-Feb-16 42418 18-Feb-16 150 29-Sep-16 Capacity ) ) 3‫ م‬10-8 ‫( سعة‬ 60 P ESSRP.F15.M.G.58 1 Lifter (5 ton) )‫طن‬5( ‫راÙ?عة شوكية‬ Ma'an #REF! 12 1 SH PO 15-Jun-15 15 30-Jun-15 8 08-Jul-15 28 23-Aug-15 15 07-Sep-15 15 22-Sep-15 5 27-Sep-15 4 01-Oct-15 120 3.93443 29-Jan-16 Alaádiat vehicles trading company A 12 31-Aug-15 #REF! 42254 07-Sep-15 -15 23-Aug-15 18 10-Sep-15 ### ### 14-Dec-15 0 14-Dec-15 120 10-Aug-16 61 P ESSRP.F15.M.G.59 1 Skid Loader 2.5 ton ‫سكد لودر‬ Maán #REF! 12 1 SH PO 15-Jun-15 15 30-Jun-15 8 08-Jul-15 28 05-Aug-15 15 20-Aug-15 20-Aug-15 7 27-Aug-15 5 07-Sep-15 60 1.96721 06-Nov-15 Aljrrarat Company A 12 21-Jun-15 ##### 42183 28-Jun-15 16 14-Jul-15 #### 0 ### 07-Sep-15 42254 07-Sep-15 60 25-Oct-15 62 P ESSRP.F15.M.G.60 1 Cargo Trucks ( 2.5-3.5 -2.5 ‫قالبات ثابتة ( سعة‬ Ma'an #REF! 12 1 SH 15-Jun-15 15 30-Jun-15 8 08-Jul-15 28 18-Aug-15 15 02-Sep-15 02-Sep-15 7 09-Sep-15 5 14-Sep-15 60 1.96721 13-Nov-15 Motor Vehicle trading A 12 30-Jul-15 06-Aug-15 12 18-Aug-15 01-Nov-15 01-Nov-15 60 07-Jan-16 ton Capacity ) )‫ طن‬3.5 63 P ESSRP.F15.M.G.61 1 Electricity crane rising ‫راÙ?عة كهرباء‬ Ma'an #REF! 12 1 SH 15-Jun-15 15 30-Jun-15 8 08-Jul-15 28 05-Aug-15 15 20-Aug-15 20-Aug-15 7 00-Jan-00 5 10-Sep-15 150 4.91803 07-Feb-16 Motor Vehicle trading A 12 31-Aug-15 07-Sep-15 22 29-Sep-15 ### 10-Sep-15 146 03-Feb-16 150 25 meters 64 P ESSRP.F15.M.G.62 1 Compactors ( 18 m3 )3‫ م‬18 ‫ضاغطات (سعة‬ #REF! #REF! 13 1 SH PO 15-Jun-15 15-Jun-15 8 23-Jun-15 28 08-Aug-15 15 23-Aug-15 23-Aug-15 5 28-Aug-15 4 22-Oct-15 7 0.22951 29-Oct-15 Vehicle teading Company A 13 29-Jun-15 ##### 42191 06-Jul-15 33 08-Aug-15 #### 0 ### 22-Oct-15 0 22-Oct-15 150 Capacity ) 65 P ESSRP.F15.M.G.63 1 Spraying Motor ‫الية رش بالتبخر‬ #REF! #REF! 13 1 SH PO 15-Jun-15 15-Jun-15 8 23-Jun-15 28 23-Jul-15 15 07-Aug-15 07-Aug-15 5 12-Aug-15 4 29-Jul-15 7 0.22951 05-Aug-15 Almanjal company A 13 29-Jun-15 ##### 42191 06-Jul-15 17 23-Jul-15 #### 0 ### 29-Jul-15 0 29-Jul-15 1 29-Jul-15 66 P ESSRP.F15.M.G.64 1 Pick Up Double Cabin ‫سيارة بكب اب كابينة‬ AlDleil #REF! 13 1 SH PO 15-Jun-15 15 14-Jul-15 8 22-Jul-15 28 19-Aug-15 15 03-Sep-15 03-Sep-15 7 10-Sep-15 5 19-Oct-15 90 2.95082 17-Jan-16 Commercial Industrial Company A 13 29-Jun-15 ##### 42191 06-Jul-15 17 23-Jul-15 #### 0 ### 19-Oct-15 42296 19-Oct-15 72 30-Dec-15 ‫مزدوجة‬ 67 ESSRP.F15.M.G.65 1 Tipper Trucks ( 2.5-3.5 -2.5 ‫قالبات جك ( سعة‬ AlDleil #REF! 13 1 SH PO 15-Jun-15 15 30-Jun-15 8 08-Jul-15 28 05-Aug-15 15 20-Aug-15 20-Aug-15 7 27-Aug-15 5 08-Oct-15 90 2.95082 06-Jan-16 Vehicle trading Company A 13 29-Jun-15 ##### 42191 06-Jul-15 17 23-Jul-15 #### 0 ### 08-Oct-15 42285 08-Oct-15 91 07-Jan-16 ton Capacity ) )‫ طن‬3.5 68 P ESSRP.F15.M.G.66 1 Pick Up Double Cabin ‫سيارة بكب اب كابينة‬ AlMerad #REF! 14 3 SH PO 15-Jun-15 15 10-Sep-15 8 18-Sep-15 28 16-Oct-15 15 31-Oct-15 31-Oct-15 7 07-Nov-15 5 06-Oct-15 120 3.93443 03-Feb-16 Mitsubishi A 14 26-Aug-15 ##### 42249 02-Sep-15 4 06-Sep-15 #### 0 ### 06-Sep-15 42283 06-Oct-15 120 17-Jan-15 ‫مزدوجة‬ 69 P ESSRP.F15.M.G.67 1 Steel-Wheel Roller 5T )‫طن‬5( ‫مداحل‬ Ajloun #REF! 15 1 SH PO 15-Jun-15 15 30-Jun-15 8 08-Jul-15 28 05-Aug-15 15 20-Aug-15 20-Aug-15 7 27-Aug-15 5 01-Sep-15 150 4.91803 29-Jan-16 ATCO A 15 16-Jun-15 23-Jun-15 26-Jul-15 18-Jan-16 16-Feb-16 11-Aug-16 70 P ESSRP.F15.M.G.68 1 Containers ‫حاويات Ù†Ù?ايات‬ #REF! #REF! 15 200 SH PO 15-Jun-15 15-Jun-15 8 23-Jun-15 28 21-Jul-15 15 05-Aug-15 05-Aug-15 5 10-Aug-15 4 22-Jun-15 60 1.96721 21-Aug-15 Raafat Koran A 15 20-May-15 ##### 42151 27-May-15 8 04-Jun-15 #### 0 ### 21-Jun-15 1 22-Jun-15 40 01-Aug-15 71 P ESSRP.F15.M.G.69 1 Pick Up Double Cabin ‫سيارة بكب اب كابينة‬ Ajloun #REF! 15 1 SH PO 15-Jun-15 15 01-Jul-15 8 23-Jun-15 28 21-Jul-15 15 05-Aug-15 05-Aug-15 7 12-Aug-15 5 22-Dec-15 30 0.98361 21-Jan-16 Mitsubishi A 15 16-Jun-15 ##### 42178 23-Jun-15 30 23-Jul-15 #### 0 ### 23-Jul-15 42360 22-Dec-15 30 12-Jan-16 ‫مزدوجة‬ 72 P ESSRP.F15.M.G.70 1 Compactors ( 18 m3 )3‫ م‬18 ‫ضاغطات (سعة‬ #REF! #REF! 16 1 SH PO 15-Jun-15 15-Jun-15 8 26-Jul-15 28 23-Aug-15 15 07-Sep-15 07-Sep-15 5 12-Sep-15 4 08-Mar-16 150 4.91803 05-Aug-16 MAN A 16 19-Jul-15 ##### 42211 26-Jul-15 37 01-Sep-15 #### 0 ### 28-Dec-15 71 08-Mar-16 25-Jul-16 Capacity ) 73 P ESSRP.F15.M.G.71 1 Compactors ( 16 m3 )3‫ م‬16 ‫ضاغطات (سعة‬ #REF! #REF! 16 1 SH PO 15-Jun-15 15-Jun-15 8 26-Jul-15 28 23-Aug-15 15 07-Sep-15 07-Sep-15 5 12-Sep-15 4 13-Feb-16 150 4.91803 12-Jul-16 MAN A 16 19-Jul-15 ##### 42211 26-Jul-15 148 21-Dec-15 #### 0 ### 03-Jan-16 41 13-Feb-16 Capacity ) 74 P ESSRP.F15.M.G.72 1 Compactors ( 14 m3 )3‫ م‬14 ‫ضاغطات (سعة‬ #REF! #REF! 16 2 SH PO 15-Jun-15 15-Jun-15 8 05-Mar-16 28 02-Apr-16 15 17-Apr-16 17-Apr-16 5 16-Jun-16 4 18-Jun-16 150 4.91803 15-Nov-16 MAN A 16 27-Feb-16 ##### 42434 05-Mar-16 -358 13-Mar-15 #### 0 ### 16-Jun-16 2 18-Jun-16 150 Capacity ) 75 P ESSRP.F15.M.G.73 1 Compactors ( 12 m3 )3‫ م‬12 ‫ضاغطات (سعة‬ #REF! #REF! 16 2 SH PO 15-Jun-15 15-Jun-15 8 06-Sep-15 28 04-Oct-15 15 19-Oct-15 19-Oct-15 5 24-Oct-15 4 20-Jan-16 150 4.91803 18-Jun-16 Jamal Alasbah 2 A ESSRP NCB PO 0 0 Goods Municipality 0 0 0 0 0 0 ‫وصÙ? العمل‬ ‫اسم البلدية‬ Actual Interval Interval Interval Interval Interval Interval Interval Proc. System Ref. # Com Location/ Description Municipality Mun. Quantity WB Submission/ NOL Date Invitation Date Bid Opening Date Evaluation & NOL Date Contract Award Start Date Completion Date Physical Last Contractor Plan/ Execution Execution Method (days) (mths) p Review Readiness Date Recomm. Date Complet Revised Proc. Sl. # 75 1 Compactors ( 12 m3 )3‫ م‬12 ‫ضاغطات (سعة‬ 2 SH PO (PR/PO) ion Ratio Completio n Date A 16 30-Aug-15 ##### 42253 06-Sep-15 14 20-Sep-15 #### 0 ### 29-Dec-15 22 20-Jan-16 150 20-Jul-16 Capacity ) 76 P ESSRP.F15.M.G.74 1 Compactors ( 10m3 )3‫ م‬10 ‫ضاغطات (سعة‬ #REF! #REF! 16 2 SH PO 15-Jun-15 15-Jun-15 8 06-Sep-15 28 04-Oct-15 15 19-Oct-15 19-Oct-15 5 24-Oct-15 4 28-Oct-15 150 4.91803 26-Mar-16 Jamal Alasbah A 16 30-Aug-15 ##### 42253 06-Sep-15 14 20-Sep-15 #### 0 ### 29-Dec-15 -351 12-Jan-15 150 20-Jul-16 Capacity ) 77 P ESSRP.F15.M.G.75 1 Pick Up Double Cabin ‫سيارة بكب اب كابينة‬ Al Zarqa #REF! 16 5 SH PO 15-Jun-15 15 30-Jun-15 8 14-Sep-16 28 12-Oct-16 15 27-Oct-16 27-Oct-16 7 03-Nov-16 5 18-Feb-16 90 2.95082 18-May-16 Jordan Commercial Company A 16 07-Sep-16 ##### 42627 14-Sep-16 22 06-Oct-16 #### 0 ### 15-Feb-16 42418 18-Feb-16 90 24-Apr-16 ‫مزدوجة‬ 78 P ESSRP.F15.M.G.76 1 Trucks ( 10 ton Capacity ) )‫ طن‬10 ‫قالبات ( سعة‬ Al Zarqa #REF! 16 4 SH PO 15-Jun-15 15 30-Jun-15 8 14-Sep-15 28 12-Oct-15 15 27-Oct-15 27-Oct-15 7 03-Nov-15 5 08-Nov-15 30 0.98361 08-Dec-15 Motors Vehicles Trading Company A 16 07-Sep-15 ##### 42261 14-Sep-15 22 06-Oct-15 #### 0 ### 19-Dec-15 42357 19-Dec-15 30 18-Jan-16 79 P ESSRP.F15.M.G.77 1 Containers ‫توريد حاويات‬ #REF! #REF! 16 475 SH PO 15-Jun-15 15-Jun-15 8 23-Aug-15 28 20-Sep-15 15 05-Oct-15 05-Oct-15 5 10-Oct-15 4 14-Oct-15 120 3.93443 11-Feb-16 Saleh Mashaál A 16 16-Aug-15 ##### 42239 23-Aug-15 21 13-Sep-15 #### 0 ### 29-Dec-15 0 29-Dec-15 120 15-Feb-16 80 P ESSRP.F15.M.G.78 1 spraying motor ‫جهاز رش تبخير‬ AlZarqa ‫الزرقاء‬ 16 1 SH PO 15-Jun-15 16 01-Jul-15 9 14-Sep-15 28 12-Oct-15 16 28-Oct-15 16 13-Nov-15 6 19-Nov-15 5 24-Nov-15 60 1.96721 23-Jan-16 Almanjal A 16 07-Sep-15 14-Sep-15 06-Oct-15 0 ### 08-Jan-16 -311 03-Mar-15 60 25-Feb-16 81 P ESSRP.F15.M.G.79 1 Pick ups(2*4) ‫بكب كابينة واحدة تم‬ AlZarqa ‫الزرقاء‬ 16 1 SH PO 15-Jun-15 16 01-Jul-15 9 16-Mar-16 28 13-Apr-16 16 29-Apr-16 16 15-May-16 6 21-May-16 5 26-May-16 150 4.91803 23-Oct-16 Alqudra ‫ مع‬4*4 ‫التغيير لبكب‬ A 16 09-Mar-16 0 42445 16-Mar-16 36 21-Apr-16 #### 0 ### 26-May-16 28 23-Jun-16 30 1.0 14-Jul-16 2016 ‫عطاءات‬ 82 P ESSRP.F15.M.G.80 1 Construction Equipment ‫معدات انشائية (لودر‬ Al Zarqa #REF! 16 1 SH PO 15-Jun-15 15 30-Jun-15 8 14-Sep-15 28 12-Oct-15 15 27-Oct-15 27-Oct-15 7 03-Nov-15 5 08-Nov-15 90 2.95082 01-Jun-16 CAT ‫باكو‬+17.5 ‫لودر‬+12.5 A )‫لودر‬ 07-Sep-15 14-Sep-15 06-Oct-15 08-Jan-15 03-Mar-16 90 (loader 12.5+loader 16 17.5+backhoe loader) 0 P ESSRP.F15.M.G.81 1 Containers 3‫ م‬10 ‫قالب سعة‬ #REF! #REF! 6 A 6 0 P ESSRP.F15.M.G.82 1 Pavement Paint ‫دهان األرصÙ?ة‬ #REF! #REF! 2 A 2 0 P ESSRP.F15.M.G.84 1 Light Units ‫وحدات انارة‬ #REF! #REF! 11 500 CANCELLED A 11 0 P ESSRP.F15.M.G.85 1 Spraying Motor ‫ماتور رش بالتبخر‬ #REF! #REF! 11 1 SH PO 15-Jun-15 15-Jun-15 8 23-Jun-15 28 21-Jul-15 15 05-Aug-15 05-Aug-15 5 10-Aug-15 4 14-Aug-15 150 4.91803 11-Jan-16 CANCELLED A 11 0 0 0 0 0 0 0 0 P ESSRP.F15.M.G.86 1 Streets sweeper ‫كانسات شوارع‬ Ajloun #REF! 15 1 SH PO 15-Jun-15 15 8 23-Jun-15 28 21-Jul-15 15 05-Aug-15 05-Aug-15 7 12-Aug-15 5 00-Jan-00 0 0 00-Jan-00 A 15 23-Jun-15 23-Jul-15 23-Jul-15 ESSRP Works CVDB JORDAN-EMERGENCY SERVICES AND SOCIAL RESILIENCE PROJECT-GRANT NUMBER TF015776 PROCUREMENT PLAN FOR WORKS Revision date: #REF! Date Of Last WB clearance : #REF! Submit Prepared by : CVDB SAMPLE NOT TO DELETE 1 P NCB PR 15 15-Jan-00 8 23-Jan-00 28 20-Feb-00 15 26-Mar-00 4 30-Mar-00 300 24-Jan-01 A 2 P NCB PO 8 08-Jan-00 28 05-Feb-00 15 25-Feb-00 4 29-Feb-00 300 25-Dec-00 A ‫وصÙ? العمل‬ ‫اسم البلدية‬ Actual Interval Interval Interval Interval Interval Proc. System Ref. # Com Location/ Description Municipality Mun. WB Submission/ NOL Date Invitation Date Bid Opening Date Contract Award Start Date Completion Date Contractor Plan/ Execution Method (days) p Review Readiness Date Date Proc. Sl. # (PR/PO) 1 P ESSRP.F15.W.01 1 Opening New Roads ‫ Ù?تح وتعبيد شوارع‬#REF! #REF! 1 NCB PO 03-May-15 03-May-15 7 10-May-15 28 07-Jun-15 15 27-Jun-15 4 01-Sep-15 130 09-Jan-16 Foád & Omar Dweiri A 1 26-May-15 26-May-15 5 31-May-15 29 29-Jun-15 6 13-Jul-15 50 01-Sep-15 130 09-Jan-16 2 P ESSRP.F15.W.02 1 Paving ‫ خلطة اسÙ?لتية‬#REF! #REF! 1 NCB PO 03-May-15 03-May-15 7 10-May-15 28 01-Jul-15 15 21-Jul-15 4 10-Aug-15 75 24-Oct-15 Khaled Abdullah Rjoub A 1 26-May-15 26-May-15 6 01-Jun-15 30 01-Jul-15 7 13-Jul-15 28 10-Aug-15 75 24-Oct-15 3 P ESSRP.F15.W.21 1 Retaining Wall ‫ جدران استنادية‬Irbid ‫اربد‬ 1 NCB PO 13-Jul-15 13-Jul-15 7 20-Jul-15 28 01-Jul-15 16 22-Jul-15 4 17-Oct-15 70 26-Dec-15 Maher Atebi A 1 13-Jul-15 13-Jul-15 16-Jul-15 16-Aug-15 4 20-Aug-15 17-Oct-15 70 10-May-16 4 P ESSRP.F15.W.20 1 Paving ‫ خلطة اسÙ?لتية‬#REF! #REF! 1 NCB PO 13-Jul-15 13-Jul-15 7 20-Jul-15 28 15-Jun-15 15 05-Jul-15 4 11-Oct-15 75 25-Dec-15 Khaled Alrjoub A 1 13-Jul-15 13-Jul-15 16-Jul-15 17-Aug-15 4 21-Aug-15 11-Oct-15 75 20-May-16 5 P ESSRP.F15.W.30 1 Opening New Roads ‫ Ù?تح Ùˆ تعبيد شوارع‬#REF! #REF! 1 NCB PO 15-Jan-15 15-Jan-15 7 22-Jan-15 28 15-Jun-15 15 05-Jul-15 4 01-May-16 120 29-Aug-16 Omar Dweri A ‫حصمة Ùˆ Ù?رشيات‬ 1 15-Feb-16 16-Mar-16 27-Mar-16 01-May-16 120 6 P ESSRP.F15.W.03 1 Paving ‫ خلطات اسÙ?لتية‬#REF! #REF! 2 NCB PO 30-Apr-15 30-Apr-15 7 07-May-15 28 22-Jun-15 15 27-Jul-15 4 22-Aug-15 60 21-Oct-15 Ziad Alsakran Company A 2 14-May-15 14-May-15 7 21-May-15 32 22-Jun-15 10 13-Jul-15 40 22-Aug-15 60 28-Dec-15 7 P ESSRP.F15.W.04 1 Paving ‫ خلطة اسÙ?لتية‬#REF! #REF! 3 NCB PO 20-May-15 05-Jun-15 7 12-Jun-15 28 10-Jul-15 15 14-Aug-15 4 15-Sep-16 75 29-Nov-16 feras rasheed w abdullah abu halemeh A 3 28-May-15 28-May-15 11 08-Jun-15 29 07-Jul-15 10 27-Jul-15 416 15-Sep-16 75 01-May-16 8 ESSRP.F15.W.28 1 Paving ‫ خلطة اسÙ?لتية‬#REF! #REF! 3 NCB PO 25-Jan-16 25-Jan-16 7 27-Jan-16 27 23-Feb-16 15 29-Mar-16 4 26-Apr-16 20 16-May-16 Sadeq Hussein 3 26-Jan-16 28 23-Feb-16 06-Apr-16 26-Apr-16 20 16-May-16 9 P ESSRP.F15.W.05 1 surface water drainage ‫ تصريÙ? مياه امطار‬#REF! #REF! 3 NCB PO 28-May-15 05-Jun-15 7 12-Jun-15 28 07-Jul-15 15 11-Aug-15 4 04-Oct-15 90 02-Jan-16 Monther Almanaseer A 3 28-May-15 28-May-15 11 08-Jun-15 31 09-Jul-15 10 02-Sep-15 32 04-Oct-15 90 01-Mar-16 10 P ESSRP.F15..W.06 1 Opening New Roads ‫ Ù?تح Ùˆ تعبيد شوارع‬Houran ‫سهل‬ 4 NCB PO 05-Apr-15 05-Apr-15 8 13-Apr-15 28 08-Jun-15 15 28-Jun-15 4 02-Aug-15 120 30-Nov-15 Ziad Alsakran Company A ‫الحوران‬ 4 04-May-15 04-May-15 7 11-May-15 28 08-Jun-15 2 17-Jun-15 46 02-Aug-15 120 13-Nov-15 11 P ESSRP.F15.W.07 1 Paving ‫ خلطات اسÙ?لتية‬#REF! #REF! 4 NCB PO 27-Apr-15 27-Apr-15 7 04-May-15 28 09-Jun-15 15 14-Jul-15 4 30-Sep-15 60 29-Nov-15 Issa Alrjoub Company A 4 04-May-15 04-May-15 7 11-May-15 29 09-Jun-15 5 18-Jun-15 104 30-Sep-15 60 03-Nov-15 12 P ESSRP.F15.W.08 1 Opening New Roads ‫ Ù?تح وتعبيد شوارع‬#REF! #REF! 5 NCB PO 07-Jun-15 07-Jun-15 7 10-Jun-15 28 08-Jul-15 15 28-Jul-15 4 09-Nov-15 90 07-Feb-16 Saád Aloleimat A 5 10-Jun-15 10-Jun-15 01-Jul-15 33 03-Aug-15 10 02-Sep-15 68 09-Nov-15 90 03-Jun-16 13 P ESSRP.F15.W.19 1 Paving ‫ خلطة اسÙ?لتية‬#REF! #REF! 5 NCB PO 07-Jun-15 07-Jun-15 10-Jun-15 28 08-Jul-15 15 28-Jul-15 4 04-Oct-15 90 02-Jan-16 Sadeq Hussein Company A 5 10-Jun-15 10-Jun-15 01-Jul-15 34 04-Aug-15 10 02-Sep-15 32 04-Oct-15 90 30-May-16 14 P ESSRP.F15.W.27 1 Paving ‫ خلطة اسÙ?لتية‬#REF! #REF! 5 NCB PO 20-Jan-16 20-Jan-16 7 27-Jan-16 28 24-Feb-16 15 08-Mar-16 4 12-Mar-16 300 06-Jan-17 Ziad Alsakran Company A 5 24-Jan-16 18-Feb-16 08-Mar-16 20 15 P ESSRP.F15.W.09 1 Opening New Roads ‫ Ù?تح وتعبيد شوارع‬#REF! #REF! 6 NCB PO 07-Jun-15 07-Jun-15 7 14-Jun-15 28 02-Aug-15 15 02-Sep-15 4 09-Nov-15 120 08-Mar-16 Saád Aloleimat A 6 28-Jun-15 28-Jun-15 3 01-Jul-15 32 02-Aug-15 10 02-Sep-15 68 09-Nov-15 120 16 P ESSRP.F15.W.25 1 Paving ‫ خلطة اسÙ?لتية‬#REF! #REF! 6 NCB PO 15-Oct-15 15-Oct-15 7 22-Oct-15 28 19-Nov-15 15 31-Dec-15 4 04-Jan-16 90 03-Apr-16 Ziad Alsakran Company A 6 02-Nov-15 30-Nov-15 31-Dec-15 15-Feb-15 90 15-Feb-15 17 P ESSRP.F15.W.10 1 Opening New Roads & ‫ Ù?تح وتعبيد شوارع‬#REF! #REF! 8 NCB PO 20-Jun-15 20-Jun-15 7 27-Jun-15 28 25-Jul-15 15 14-Aug-15 4 22-Nov-15 120 21-Mar-16 anwar abu shalfa A Paving ‫مع خلطة اسÙ?لتية‬ 8 09-Aug-15 06-Sep-15 10 12-Oct-15 41 22-Nov-15 120 01-May-16 18 P ESSRP.F15.W.24 1 Parks ‫ انشاء ملعب‬#REF! #REF! 8 NCB PO 01-Oct-15 01-Oct-15 7 13-Oct-15 28 11-Nov-15 15 01-Dec-15 4 01-Feb-16 200 19-Aug-16 Aied Alarda A ‫سداسي مع غرÙ?ة‬ 8 11-Nov-15 10 17-Jan-16 15 01-Feb-16 200 21-Aug-16 13-Oct-15 ‫غيار مع كشاÙ?ات‬ 19 P ESSRP.F15.W.11 1 Paving ‫ انارة‬#REF! ‫خلطة اسÙ?لتية‬ #REF! 9 NCB PO 04-May-15 04-May-15 7 11-May-15 28 08-Jun-15 15 28-Jun-15 4 22-Aug-15 60 21-Oct-15 Sadeq hussein/Alásr contracting A 9 12-May-15 12-May-15 6 18-May-15 30 17-Jun-15 4 28-Jun-15 55 22-Aug-15 60 21-Oct-15 20 P ESSRP.F15.W.12 1 Opening New Roads ‫ Ù?تح Ùˆ تعبيد شوارع‬#REF! #REF! 10 NCB PO 24-May-15 24-May-15 8 05-Jun-15 28 08-Jul-15 15 28-Jul-15 4 13-Sep-15 75 27-Nov-15 ghaleb abu jrees A and Paving ‫مع خلطة اسÙ?لتية‬ 10 24-May-15 24-May-15 15 08-Jun-15 30 08-Jul-15 10 27-Jul-15 48 13-Sep-15 75 27-Mar-16 21 P ESSRP.F15.W.13 1 Paving ‫ خلطة اسÙ?لتية‬#REF! #REF! 13 NCB PO 06-May-15 27-May-15 7 03-Jun-15 28 06-Jul-15 15 26-Jul-15 4 10-Oct-15 35 14-Nov-15 Ziad Alsakran Company A 13 27-May-15 27-May-15 12 08-Jun-15 28 06-Jul-15 10 02-Sep-15 38 10-Oct-15 35 23-Dec-15 22 P ESSRP.F15.W.15 1 Paving ‫ Ù?تح Ùˆ تعبيد Ùˆ عمل‬#REF! #REF! 14 NCB PO 07-May-15 07-May-15 7 14-May-15 28 10-Jun-15 15 30-Jun-15 4 13-Jul-15 100 21-Oct-15 Alnsour & Alzghol compamy A ‫خلطة اسÙ?لتية‬ 14 04-May-15 04-May-15 7 11-May-15 30 10-Jun-15 7 28-Jun-15 15 13-Jul-15 100 21-Oct-15 Moassaset 23 P ESSRP.F15.W.16 1 Curbs and sidewalks ‫ أرصÙ?Ø© Ùˆ أطاريÙ?‬#REF! #REF! 14 NCB PO 01-Jul-15 01-Jul-15 7 08-Jul-15 28 05-Aug-15 15 25-Aug-15 4 24-Oct-15 130 02-Mar-16 alquds alkobra/mahmo Submit ESSRP Works CVDB Prepared by : CVDB SAMPLE NOT TO DELETE 1 P NCB PR 15 15-Jan-00 8 23-Jan-00 28 20-Feb-00 15 26-Mar-00 4 30-Mar-00 300 24-Jan-01 A 2 P NCB PO 8 08-Jan-00 28 05-Feb-00 15 25-Feb-00 4 29-Feb-00 300 25-Dec-00 A Actual ‫وصÙ? العمل‬ ‫اسم البلدية‬ Interval Interval Interval Interval Interval Proc. System Ref. # Com Location/ Description Municipality Mun. WB Submission/ NOL Date Invitation Date Bid Opening Date Contract Award Start Date Completion Date Contractor Plan/ Execution Method (days) p Review Readiness Date Date Proc. Sl. # 23 ESSRP.F15.W.16 1 Curbs and sidewalks ‫ أرصÙ?Ø© Ùˆ أطاريÙ?‬#REF! #REF! NCB PO (PR/PO) A 14 42198 13-Jul-15 30 12-Aug-15 15 07-Sep-15 47 24-Oct-15 130 24 P ESSRP.F15.W.17 1 Paving ‫ خلطة اسÙ?لتية‬#REF! #REF! 15 NCB PO 21-May-15 21-May-15 7 28-May-15 28 15-Jun-15 15 05-Jul-15 4 11-Aug-15 50 30-Sep-15 Khaled Alrjoub CompaNY A 15 13-May-15 13-May-15 5 18-May-15 28 15-Jun-15 7 28-Jun-15 44 11-Aug-15 50 30-Sep-15 25 P ESSRP.F15.W.26 1 Paving ‫ خلطة اسÙ?لتية‬#REF! #REF! 15 NCB PO 10-Dec-15 10-Dec-15 7 17-Dec-15 28 18-Jan-16 15 07-Feb-16 4 11-Feb-16 300 07-Dec-16 Mohannad AlMoghrabi A 15 10-Dec-15 10-Dec-15 11 21-Dec-15 18-Jan-15 07-Feb-16 31-Jul-16 30 26 P ESSRP.F15.W.29 1 Products Exhibition ‫ معرض المنتوجات‬#REF! #REF! 16 NCB PO 18-Jan-16 18-Jan-16 7 31-Jan-16 29 29-Feb-16 15 10-Jul-16 4 14-Jul-16 180 10-Jan-17 Barfelia A 16 04-May-16 29 02-Jun-16 10-Jul-16 180 27 P ESSRP.F15.W.18 1 Surface Water Drainage ‫ تصريÙ? مياه امطار‬Ma'an ‫معان‬ 12 NCB PO 21-May-15 21-May-15 7 28-May-15 28 15-Jun-15 15 05-Jul-15 4 05-Aug-15 50 24-Sep-15 Mansour issa aqaileh A 12 14-May-15 14-May-15 4 18-May-15 29 16-Jun-15 4 28-Jun-15 05-Aug-15 50 24-Sep-15 08-Jun-15 08-Jul-15 03-Aug-15 60 ESSRP Goods CVDB JORDAN-EMERGENCY SERVICES AND SOCIAL RESILIENCE PROJECT-GRANT NUMBER TF015776 PROCUREMENT PLAN FOR GOODS Revision date: #REF! Date Of Last WB clearance : #REF! Submitted by : ESSRP PMU Prepared by : CVDB SAMPLE NOT TO DELETE 1 P ICB 05-Mar-00 20-Mar-00 09-Apr-00 9.836065574 07-Feb-01 A 2 P NCB 05-Feb-00 20-Feb-00 25-Feb-00 9.836065574 25-Dec-00 A Execution (mths) Proc. Method Plan/ Actual Component Last Submission/ Bid Opening Evaluation & Contract Completion Revised Sl. # Proc. System Ref. # Location/ Description Municipality Readiness Date Recomm. Award Date Date Completi Date on Date P Houran NCB 05-Apr-15 26-May-15 10-Jun-15 22-Jun-15 2.95082 24-Sep-15 A NCB 07-Apr-15 11-May-15 28-May-15 10-Jun-15 3.9 16-Oct-15 1 ESSRP.F15.G.NCB.11 1 Spraying Tractor AlDleil NCB Ajloun NCB Al Zarqa NCB JORDAN-EMERGENCY SERVICES AND SOCIAL RESILIENCE PROJECT-GRANT NUMBER TF015776 PROCUREMENT PLAN FOR CONSULTANCY SERVICES - CONSULTING FIRMS Revision date: January 28, 2015 Date Of Last WB clearance : January 1, 2014 Subm itted by : ESSRP PMU Prepared by : CVDB SAMPLE NOT TO DELETE 1 R PR 14 14-Jan-00 14 28-Jan-00 14 11-Feb-00 7 18-Feb-00 5-May-00 2-Jul-00 100 3.28 10-Oct-00 A 0 0 0 0 0.00 0-Jan-00 1 R PO 14 14-Jan-00 14-Jan-00 14 28-Jan-00 7 4-Feb-00 24-Mar-00 23-Apr-00 100 3.28 1-Aug-00 A 0 0 0 0 0.00 0-Jan-00 Execution in days Proc. Method Execution in Plan/ Actual months Interval Interval Interval Interval WB Technical Sl. # TOR Start Adv. EOI end Short Listing Contract Completion Proc. System Ref. # Comp Location/ Description Review TOR end Date NOL Date Evaluation Date Date Report Date Start Date Date (PR/PO) Report Date 1 R ESSRP.B.01 2 Municipal Support Team QCBS PR 16-Jan-14 14 30-Jan-14 14 13-Feb-14 14 10-Mar-14 7 17-Mar-14 2-Jun-14 30-Jul-14 100 3.28 7-Nov-14 A 2 16-Jan-14 12 28-Jan-14 0 28-Jan-14 148 25-Jun-14 20 15-Jul-14 19-Nov-14 1-Apr-15 732 24.0 02-Apr-17 2 R ESSRP.B.04 2/Gvt MOMA-CVDB Management Contract SSS PR 5-Dec-13 14 19-Dec-13 19-Dec-13 14 2-Jan-14 7 9-Jan-14 27-Feb-14 29-Mar-14 100 3.28 7-Jul-14 A 2/Gvt (for 3 Years) 5-Dec-13 54 28-Jan-14 12 9-Feb-14 0 9-Feb-14 0 9-Feb-14 9-Feb-14 1-Jan-14 732 24.0 03-Jan-16 3 R ESSRP.B.05 2 External Auditor /2014 QCBS PR 1-Jun-14 14 15-Jun-14 15-Jun-14 14 29-Jun-14 7 6-Jul-14 24-Aug-14 23-Sep-14 100 3.28 1-Jan-15 A 2 20-Jun-14 19 9-Jul-14 6 15-Jul-14 124 16-Nov-14 60 15-Jan-15 17-Feb-15 14-Apr-15 152.5 5.0 13-Sep-15 4 R ESSRP.B.06 2 PMU Operation SH PO 14 14-Jan-00 14-Jan-00 14 28-Jan-00 7 4-Feb-00 24-Mar-00 23-Apr-00 100 3.28 1-Aug-00 A 2 0 0 0 0 0.0 00-Jan-00 5 R ESSRP.B.07 2 Financial Information System SH PO 1-Sep-14 14 15-Sep-14 14 29-Sep-14 14 10-Mar-14 7 17-Mar-14 2-Jun-14 30-Jul-14 100 3.28 7-Nov-14 A 2 6 R ESSRP.B.08 2 UNDP SH A 2 7 R ESSRP.B.09 2 External Auditor /2015+2014 QCBS PO 1-Jan-15 14 15-Jan-15 14 29-Jan-15 14 10-Mar-14 7 17-Mar-14 2-Jun-14 30-Jul-14 100 3.28 7-Nov-14 A 2 9-Apr-15 27-Apr-15 5-May-15 1-Jun-15 22-Jul-15 730 8 R ESSRP.B.11 2 Local Emergancy Risk Management QCBS PO 1-Dec-14 14 15-Dec-14 14 29-Dec-14 14 10-Mar-14 7 17-Mar-14 2-Jun-14 30-Jul-14 100 3.28 7-Nov-14 A 2 1-Dec-14 36 6-Jan-15 118 4-May-15 10-May-15 16-Aug-15 21-Jan-16 9 R ESSRP.B.25 2 ILO QCBS PO 1-Jul-16 14 15-Jul-16 14 29-Jul-16 14 12-Aug-16 7 19-Aug-16 4-Nov-16 1-Jan-17 100 3.28 11-Apr-17 A 2 #### #### 1 10 R ESSRP.B.26 2 Offices furniture SH PO A 2 2 11 R ESSRP.B.27 2 Computers SH PO A 2 1 10 R ESSRP.B.26 2 PMU Scanning and copying Machines SH PO A 2 (3) 2 11 R ESSRP.B.27 2 PMU Printers (10) SH PO A 2 3 12 R ESSRP.B.28 2 PMU Desktops Computers (10) SH PO A 2 4 13 R ESSRP.B.29 2 Rehalibitation of PMU offices SH PO A 2 5 14 R ESSRP.B.30 2 PMU AC Units (6) SH PO A 2 6 15 R ESSRP.B.31 2 Accommodation for PMU (20 SH PO A 2 Desks,20chairs,20 ) 7 16 R ESSRP.B.32 2 PMU Labtops (8) SH PO A 2 8 17 R ESSRP.B.33 2 PMU stationary SH PO A 2 9 18 R ESSRP.B.34 2 PMU and Municipalities Trainings SH PO A 2 JORDAN-EMERGENCY SERVICES AND SOCIAL RESILIENCE PROJECT-GRANT NUMBER TF015776 PROCUREMENT PLAN FOR CONSULTANCY SERVICES - INDIVIDUAL CONSULTANTS Revision date: October 26, 2017 Date Of Last WB clearance : Submitted by : ESSRP PMU Prepared by : CVDB SAMPLE NOT TO DELETE R PR 14 14-Jan-00 14 28-Jan-00 14 11-Feb-00 7 18-Feb-00 14 3-Mar-00 7 10-Mar-00 14 24-Mar-00 7 31-Mar-00 2 2-Apr-00 300 9.84 27-Jan-01 NA A 0 0 0 0 0 0 0 0 0 0.00 0-Jan-00 R PO 14 14-Jan-00 14-Jan-00 14 28-Jan-00 7 4-Feb-00 4-Feb-00 7 11-Feb-00 11-Feb-00 7 18-Feb-00 2 20-Feb-00 300 9.84 16-Dec-00 NA A 0 0 0 0 0 0 0 0 0 0.00 0-Jan-00 Execution in days TOR Completion Last Revised Comments Proc. Method Start Date Date Completion Date Execution in Pla Short Contract Interval Interval Interval Interval Interval Interval Interval Interval months WB Contract Interval Sl. n/ TOR end Adv. EOI Listing negotiation/ Contract Proc. System Ref. # Comp Location/ Description Review NOL Date NOL Date NOL Date signature # Act Date end Date Report Award- Start Date (PR/PO) Date ual Date Draft 1 R ESSRP.B.02 2 Advisor-Coordinator IC PO 5-Dec-13 10 15-Dec-13 10 25-Dec-13 5 30-Dec-13 1 31-Dec-13 1 1-Jan-14 1 2-Jan-14 1 3-Jan-14 1 4-Jan-14 2 6-Jan-14 300 10 2-Nov-14 NA on going A 2 5-Dec-13 13 18-Dec-13 9 27-Dec-13 2 29-Dec-13 4 2-Jan-14 13 15-Jan-14 0 15-Jan-14 0 15-Jan-14 7 22-Jan-14 -21 1-Jan-14 730 24 1-Jan-16 2 R ESSRP.B.03 2 Financial Management Specialist IC PO 11-Dec-13 14 25-Dec-13 25-Dec-13 14 8-Jan-14 7 15-Jan-14 15-Jan-14 7 22-Jan-14 22-Jan-14 7 29-Jan-14 2 31-Jan-14 300 10 NA Terminated A 2 11-Dec-13 41 21-Jan-14 1 22-Jan-14 18 9-Feb-14 51 1-Apr-14 22 23-Apr-14 26 19-May-14 29 17-Jun-14 8 25-Jun-14 6 1-Jul-14 365 12 30-Sep-14 3 R ESSRP.B.08 2 Financial Management Specialist No.2 IC PO 11-Dec-13 14 25-Dec-13 25-Dec-13 14 8-Jan-14 7 15-Jan-14 15-Jan-14 7 22-Jan-14 22-Jan-14 7 29-Jan-14 2 31-Jan-14 300 10 27-Nov-14 NA on going A 2 15-Oct-14 26 10-Nov-14 2 12-Nov-14 8 20-Nov-14 75 3-Feb-15 ## … ## …….. ## 11-Feb-15 # 26-Feb-15 3 1-Mar-15 365 12 29-Feb-16 4 R ESSRP.B.09 2 Monitoring and Evaluation Specialist IC PO 14 14-Jan-00 14-Jan-00 14 28-Jan-00 7 4-Feb-00 4-Feb-00 7 11-Feb-00 11-Feb-00 7 18-Feb-00 2 20-Feb-00 300 10 16-Dec-00 NA completed A 2 1-Apr-15 15 16-Apr-15 1 17-Apr-15 3 20-Apr-15 ## 0 0 0 0 #### 1-Sep-15 365 12 31-Aug-16 5 R ESSRP.B.12 2 Public Awareness and Communication IC PO 1-Sep-16 14 15-Sep-16 15-Sep-16 14 29-Sep-16 7 6-Oct-16 6-Oct-16 7 13-Oct-16 13-Oct-16 7 20-Oct-16 2 22-Oct-16 365 12 22-Oct-17 NA awarded A 2 Specialist 1-Sep-16 7 8-Sep-16 25 3-Oct-16 79 21-Dec-16 ## 0 0 0 0 #### 1-Sep-17 365 12 1-Sep-18 6 R ESSRP.B.13 2 Inclusion and Gender Specialist IC PO 1-Sep-16 14 15-Sep-16 15-Sep-16 14 29-Sep-16 7 6-Oct-16 6-Oct-16 7 13-Oct-16 13-Oct-16 7 20-Oct-16 2 22-Oct-16 365 12 22-Oct-17 NA awarded A 2 1-Sep-16 7 8-Sep-16 25 3-Oct-16 79 21-Dec-16 ## 0 0 0 0 #### 1-Nov-17 365 12 1-Nov-18 7 R ESSRP.B.14 2 Project Field Supervision Engineer-1 IC PO 1-Sep-16 14 15-Sep-16 15-Sep-16 14 29-Sep-16 7 6-Oct-16 6-Oct-16 7 13-Oct-16 13-Oct-16 7 20-Oct-16 2 22-Oct-16 365 12 22-Oct-17 NA awarded A 2 1-Sep-16 7 8-Sep-16 25 3-Oct-16 79 21-Dec-16 ## 0 0 0 0 #### 1-Sep-17 365 12 1-Sep-18 8 R ESSRP.B.15 2 Project Field Supervision Engineer-2 IC PO 1-Sep-16 14 15-Sep-16 15-Sep-16 14 29-Sep-16 7 6-Oct-16 6-Oct-16 7 13-Oct-16 13-Oct-16 7 20-Oct-16 2 22-Oct-16 365 12 22-Oct-17 NA awarded A 2 1-Sep-16 7 8-Sep-16 25 3-Oct-16 79 21-Dec-16 ## 0 0 0 0 #### 1-Sep-17 365 12 1-Sep-18 9 R ESSRP.B.16 2 Project Planning Consultant-1 IC PO 1-Sep-16 14 15-Sep-16 15-Sep-16 14 29-Sep-16 7 6-Oct-16 6-Oct-16 7 13-Oct-16 13-Oct-16 7 20-Oct-16 2 22-Oct-16 365 12 22-Oct-17 NA awarded A 2 1-Sep-16 7 8-Sep-16 25 3-Oct-16 79 21-Dec-16 ## 0 0 0 0 #### 1-Oct-17 365 12 1-Oct-18 10 R ESSRP.B.17 2 Project Planning Consultant-2 IC PO 1-Sep-16 14 15-Sep-16 15-Sep-16 14 29-Sep-16 7 6-Oct-16 6-Oct-16 7 13-Oct-16 13-Oct-16 7 20-Oct-16 2 22-Oct-16 365 12 22-Oct-17 NA awarded A 2 1-Sep-16 7 8-Sep-16 25 3-Oct-16 79 21-Dec-16 ## 0 0 0 0 #### 1-Oct-17 365 12 1-Oct-18 11 R ESSRP.B.18 2 FIELD BASED FINANCIAL IC PO 1-Sep-16 14 15-Sep-16 15-Sep-16 14 29-Sep-16 7 6-Oct-16 6-Oct-16 7 13-Oct-16 13-Oct-16 7 20-Oct-16 2 22-Oct-16 365 12 22-Oct-17 NA awarded A 2 MANAGEMENT SPECIALIST-1 1-Sep-16 7 8-Sep-16 25 3-Oct-16 79 21-Dec-16 ## 0 0 0 0 #### 1-Sep-17 365 12 1-Sep-18 12 R ESSRP.B.19 2 FIELD BASED FINANCIAL IC PO 1-Sep-16 14 15-Sep-16 15-Sep-16 14 29-Sep-16 7 6-Oct-16 6-Oct-16 7 13-Oct-16 13-Oct-16 7 20-Oct-16 2 22-Oct-16 365 12 22-Oct-17 NA awarded A 2 MANAGEMENT SPECIALIST-2 1-Sep-16 7 8-Sep-16 25 3-Oct-16 79 21-Dec-16 ## 0 0 0 0 #### 1-Sep-17 365 12 1-Sep-18 13 R ESSRP.B.20 2 Community Outreach and Citizen IC PO 1-Sep-16 14 15-Sep-16 15-Sep-16 14 29-Sep-16 7 6-Oct-16 6-Oct-16 7 13-Oct-16 13-Oct-16 7 20-Oct-16 2 22-Oct-16 365 12 22-Oct-17 NA awarded A 2 Engagement Specialist -1 1-Sep-16 7 8-Sep-16 25 3-Oct-16 79 21-Dec-16 ## 0 0 0 0 #### 1-Sep-17 365 12 1-Sep-18 14 R ESSRP.B.21 2 Community Outreach and Citizen IC PO 1-Sep-16 14 15-Sep-16 15-Sep-16 14 29-Sep-16 7 6-Oct-16 6-Oct-16 7 13-Oct-16 13-Oct-16 7 20-Oct-16 2 22-Oct-16 365 12 22-Oct-17 NA awarded A 2 Engagement Specialist -2 1-Sep-16 7 8-Sep-16 25 3-Oct-16 79 21-Dec-16 ## 0 0 0 0 #### 1-Nov-17 365 12 1-Nov-18 15 R ESSRP.B.22 2 Procurment Engineer-1 IC PO 1-Sep-16 14 15-Sep-16 15-Sep-16 14 29-Sep-16 7 6-Oct-16 6-Oct-16 7 13-Oct-16 13-Oct-16 7 20-Oct-16 2 22-Oct-16 365 12 22-Oct-17 NA awarded A 2 1-Sep-16 7 8-Sep-16 25 3-Oct-16 79 21-Dec-16 ## 10-Apr-17 0 10-Apr-17 ## 0 0 #### 1-Sep-17 365 12 1-Sep-18 16 R ESSRP.B.23 2 Procurment Engineer-2 IC PO 1-Sep-16 14 15-Sep-16 15-Sep-16 14 29-Sep-16 7 6-Oct-16 6-Oct-16 7 13-Oct-16 13-Oct-16 7 20-Oct-16 2 22-Oct-16 365 12 22-Oct-17 NA awarded A 2 1-Sep-16 7 8-Sep-16 25 3-Oct-16 79 21-Dec-16 ## 10-Apr-17 0 10-Apr-17 ## 0 0 #### 1-Sep-17 365 12 1-Sep-18 4 R ESSRP.B.24 2 Monitoring and Evaluation Specialist-2 IC PO 14 14-Jan-00 14-Jan-00 14 28-Jan-00 7 4-Feb-00 4-Feb-00 7 11-Feb-00 11-Feb-00 7 18-Feb-00 2 20-Feb-00 300 10 16-Dec-00 NA awarded A 2 0 0 0 0 0 0 0 0 #### 1-Oct-17 365 1-Oct-18 ‫البلديه‬ ‫نوع العطاء‬ ‫المشروع‬ ‫الكمية‬ ‫تاريخ االعالن بالجريدة‬ ‫تاريخ Ù?تح العروض‬ ‫تاريخ توقيع االحالة‬ ‫تاريخ البداية‬ ‫مدة التنÙ?يذ‬ % ‫المالحظات‬ ‫اسم المقاول‬ Sahab CVDB-W ‫Ù?تح Ùˆ تعبيد مع خلطة‬ 1 8-Jun-15 8-Jul-15 3-Aug-15 13-Sep-15 75 100% Completed ghaleb abu jrees Sahab CVDB-W AL Nejma Sahab PM-G ‫وحدات انارة‬ 250 1-Jun-15 8-Jun-15 4-Jul-15 27-Jul-15 60 100% Completed company Sahab PM-G ‫ضاغطة حجم كبير‬ 1 17-Aug-15 17-Sep-15 19-Oct-15 19-Oct-15 150 100% Completed jamal alasbah Turkish Sahab PM-G ‫راÙ?عة هيدروركية‬ 1 7-Sep-15 14-Sep-15 7-Jan-16 8-Jan-16 120 0% Completed Jordanian for vehicle trading Sahab PM-G ‫ماتور رش‬ 1 11-Aug-15 18-Aug-15 12-Sep-15 12-Sep-15 90 100% Completed alfalaq company Motors vehicle Sahab PM-G ‫)Ù… جك‬3-2.5( ‫ديانا‬ 1 31-Aug-15 27-Dec-15 26-Jan-16 26-Jan-16 60 100% Completed trading company Motors vehicle Sahab PM-G ‫)Ù… ثابت‬3-2.5( ‫ديانا‬ 1 31-Aug-15 28-Dec-16 26-Jan-16 26-Jan-16 60 100% Completed trading company Sahab PM-G ‫سكد لودر بوب كات‬ 1 31-Aug-15 10-Sep-15 7-Jan-16 8-Jan-16 90 0% Completed CAT Mitsubishi Sahab PM-G ‫بك اب دبل كبين‬ 1 7-Sep-15 14-Sep-15 22-Dec-15 14-Jan-16 20 100% Completed ‫التجارية االردنية‬ j‫توريد موادصيانة ارصÙ?ة‬ Sahab PM-G 1 18-Jun-15 24-Jun-15 11-Jul-15 22-Jul-15 60 100% Completed Delta company ‫وعبارات وكندرين‬ universal Sahab PM-G 2‫)م‬12-10( ‫قالب‬ 1 18-Aug-15 24-Aug-15 23-Dec-15 14-Jan-16 150 100% Completed company Sahab PM-G ‫وحدات انارة‬ 125 30-Jan-16 10-Mar-16 10-Mar-16 15-Mar-16 1 100% Completed Najmet Almostaqbal Sahab PM-G ‫حاويات‬ 70 13-Dec-16 15-Jan-16 15-Jan-16 15-Jan-16 30 100% Completed Ra'afat Quraan Sahab PM-G ‫خالطة باطون‬ 1 3-Sep-16 4-Sep-16 4-Sep-16 1 100% #REF! hassan abu safi ‫تسهيالت بيئية لذوي االحتياجات‬ mohammad Sahab PM-G 1 0-Jan-00 3-Sep-16 7-Sep-16 24-Sep-16 14 100% #REF! ‫الخاصة‬ sobha Sahab PM-G ‫تزيين شوارع بأشجار الزينة‬ 1 0-Jan-00 3-Sep-16 4-Sep-16 4-Sep-16 1 100% #REF! belal farming Sahab PM-G ‫تأهيل الحديقة‬ 1 0-Jan-00 22-Sep-16 5-Jan-17 0-Jan-00 14 100% #REF! Classic furniture ‫البلديه‬ ‫نوع العطاء‬ ‫المشروع‬ ‫الكمية‬ ‫تاريخ االعالن بالجريدة‬ ‫تاريخ Ù?تح العروض‬ ‫تاريخ توقيع االحالة‬ ‫تاريخ البداية‬ ‫مدة التنÙ?يذ‬ ‫‪%‬‬ ‫المالحظات‬ ‫اسم المقاول‬ ‫‪Albashiti/Alhzay‬‬ ‫‪Sahab‬‬ ‫‪PM-G‬‬ ‫معدات بناشر‬ ‫‪1‬‬ ‫‪0-Jan-00‬‬ ‫‪12-Oct-16‬‬ ‫‪12-Oct-16‬‬ ‫‪12-Oct-16‬‬ ‫‪6‬‬ ‫‪100%‬‬ ‫!‪#REF‬‬ ‫‪yen‬‬ ‫‪Sahab‬‬ ‫‪PM-G‬‬ ‫دهان تجميل المدينة‬ ‫‪1‬‬ ‫‪0-Jan-00‬‬ ‫‪25-Aug-16‬‬ ‫‪25-Aug-16‬‬ ‫‪25-Aug-16‬‬ ‫‪0‬‬ ‫‪100%‬‬ ‫!‪#REF‬‬ ‫‪saleh dmeiri‬‬ ‫‪Sahab‬‬ ‫‪PM-G‬‬ ‫تأهيل مكتبة البلدية‬ ‫‪1‬‬ ‫‪0-Jan-00‬‬ ‫‪3-Sep-16‬‬ ‫‪4-Sep-16‬‬ ‫‪4-Sep-16‬‬ ‫‪1‬‬ ‫!‪#REF‬‬ ‫‪0‬‬ ‫‪Sahab‬‬ ‫‪PM-G‬‬ ‫مخططات مشروع موقÙ? الباصات‬ ‫‪1‬‬ ‫‪Ahmad Sabha‬‬ ‫‪Asas For‬‬ ‫‪Sahab‬‬ ‫‪PM-G‬‬ ‫شراء حجر كندرين‬ ‫‪1‬‬ ‫‪10-Aug-16‬‬ ‫‪25-Aug-16‬‬ ‫‪28-Aug-16‬‬ ‫‪28-Aug-16‬‬ ‫‪5‬‬ ‫!‪#REF‬‬ ‫‪concrete‬‬ ‫‪Sahab‬‬ ‫‪PM-G‬‬ ‫تزيين شوارع بأشجار الزينة‬ ‫‪1‬‬ ‫‪Sahab‬‬ ‫‪PM-G‬‬ ‫إزاله انقاذ‬ ‫‪1‬‬ ‫البلديه‬ ‫نوع العطاء‬ ‫المشروع‬ ‫الكمية‬ ‫تاريخ االعالن بالجريدة‬ ‫تاريخ Ù?تح العروض‬ ‫تاريخ توقيع االحالة‬ ‫تاريخ البداية‬ ‫مدة التنÙ?يذ‬ % ‫المالحظات‬ ‫اسم المقاول‬ Naour PM-G ‫شراء مبيدات حشرية‬ 1 1 rejected by WB Althaher for agricultural services Naour PM-G 3‫م‬8 ‫شراء ضاغطة سعة‬ 2 30-Jul-15 6-Aug-15 8-Dec-15 22-Dec-15 150 #REF! completed Jamal Alasbah Naour PM-G ‫لتر‬11000 ‫شراء حاويات معدنية لنÙ?ايات سعة‬ 150 26-Apr-15 5-May-15 31-May-15 10-Jun-15 30 #REF! completed Raáfat Alodwan Naour PM-G )‫ طن‬3.5-2.5 ‫قالبات ثابتة ( سعة‬ 2 19-Aug-15 30-Aug-15 12-Nov-15 22-Nov-15 90 100% completed Vehicle trading company Naour PM-G ‫جراÙ?Ø© Ø­Ù?ار عقرب‬ 1 19-Aug-15 30-Aug-15 2-Feb-16 29-Dec-15 10 100% Commercial Trading completed company Naour PM-G ‫بكب اب دبل كبين‬ 2 19-Aug-15 30-Aug-15 3-Nov-15 25-Nov-16 15 100% completed Mitsubishi Naour PM-G ‫شراء سكد لودر‬ 1 19-Aug-15 30-Aug-15 18-Nov-15 1-Feb-16 150 #REF! completed Aljarrarat Naour PM-G ‫شراء ماتور تدخين‬ 2 18-Feb-15 26-Feb-15 7-Apr-15 7-Apr-15 7 100% completed Middle east for sterelization company Naour PM-G Almowahhada Company Naour PM-W ‫حمالت نظاÙ?Ø© وغابات سيل حسبان وغابة االطÙ?ال‬ 1 1-Jun-15 8-Jun-15 15-Jun-15 15-Jun-15 7 100% completed -Dar alfan Naour PM-W ‫حمالت دهان ارصÙ?Ø© واطاريÙ?‬ 1 18-Feb-15 24-Feb-15 7-Apr-15 16-Apr-15 1 100% completed Saybs Company Naour PM-W ‫متنزه سيل حسبان‬ 1 2-Dec-15 8-Dec-15 5-Jan-16 21-Feb-16 90 100% completed Issam Saáideh Abdullah Alhowrani Naour PM-W ‫اعادة تاهيل مثلث حي الشهيد واقامة دوار‬ 1 1-May-15 7-May-15 11-May-15 11-May-15 90 100% completed Sons Company Alnajmeh Alraédah Company Alahwash Contracting Naour PM-W ‫بناء عبارات صندوقية‬ 1 9-Apr-15 16-Apr-15 10-May-15 30-May-15 90 100% completed Company Naour PM-W 2 - ‫بناء عبارات صندوقية‬ 1 20-May-15 26-May-15 8-Jun-15 11-Aug-15 90 100% completed Ahmad Ayesh Naour PM-W ‫ نشاطات تعليمية لالطÙ?ال‬/ ‫ مكتبة‬/ ‫محطة معرÙ?ة‬ 1 20-May-15 31-May-15 3-Jun-15 3-Jun-15 14 100% completed Ibrahem Hassan Alnajmeh Alraédah Naour PM-W ‫تركيب مظالت ركاب‬ 50 7-Feb-15 14-Feb-15 7-Apr-15 7-Apr-15 30 100% completed Company Naour PM-W ‫انشطة مختلÙ?ة‬ 1 ‫البلديه‬ ‫نوع العطاء‬ ‫المشروع‬ ‫الكمية‬ ‫تاريخ االعالن بالجريدة‬ ‫تاريخ Ù?تح العروض‬ ‫تاريخ توقيع االحالة‬ ‫تاريخ البداية‬ ‫مدة التنÙ?يذ‬ % ‫المالحظات‬ ‫اسم المقاول‬ Naour PM-W Maan CVDB-W ‫تصريÙ? مياه امطار‬ 1 18-May-15 16-Jun-15 6-Jul-15 5-Aug-15 60 100% completed Mansour Aqaileh Maan CVDB-W Maan PM-G 3‫م‬10-8 ‫صهريج نضح‬ 1 11-Aug-15 30-Aug-15 14-Feb-16 14-Feb-16 150 100% Deliverd Motor Vehicle trading Maan PM-G ‫متر‬25 ‫راÙ?عة كهرباء بارتÙ?اع‬ 1 7-Sep-15 29-Sep-15 3-Feb-16 3-Feb-16 150 0% Motor Vehicle trading Maan PM-G ‫سكد لودر بوب كات‬ 1 28-Jun-15 14-Jul-15 7-Sep-15 7-Sep-15 60 100% Deliverd Aljarrarat Company Maan PM-G )‫ طن‬3.5-2.5 ‫قالبات ثابتة ( سعة‬ 1 6-Aug-15 18-Aug-15 1-Nov-15 1-Nov-15 60 100% Deliverd Motor Vehicle trading Maan PM-G Alaádiat vehicles ‫ طن‬5 ‫راÙ?عة شوكية‬ 1 23-Aug-15 10-Sep-15 14-Dec-15 14-Dec-15 120 100% Deliverd trading company Maan PM-W ‫اطاريÙ? وارصÙ?ة‬ 1 28-Apr-15 7-May-15 21-Jun-15 21-Jun-15 90 100% completed Mansour Aqaileh Maan PM-W Khaldoon Jarabáa ‫Ù?تح وتعبيد شوارع‬ 1 17-May-15 27-May-15 17-Jun-15 22-Jul-15 50 100% completed Company Maan PM-W ‫انشطة مختلÙ?ة‬ 1 Maan PM-W ‫البلديه‬ ‫نوع العطاء‬ ‫المشروع‬ ‫الكمية‬ ‫تاريخ االعالن بالجريدة‬ ‫تاريخ Ù?تح العروض‬ ‫تاريخ توقيع االحالة‬ ‫تاريخ البداية‬ ‫مدة التنÙ?يذ‬ % ‫المالحظات‬ ‫اسم المقاول‬ Al Dleil CVDB-G ‫تركتور رش سائل‬ 1 12-Apr-15 11-May-15 10-Jun-15 10-Jun-15 120 100% Comleted Almanjal Al Dleil Al Dleil CVDB-W ‫خلطة اسÙ?لتية‬ 1 8-Jun-15 6-Jul-15 2-Sep-15 10-Oct-15 35 100% completed Ziad Alsakran Commercial Al Dleil PM-G ‫سيارة بكب كابينة مزدوجة‬ 1 18-Aug-15 31-Aug-15 19-Oct-15 19-Oct-15 90 100% procured Industrial Company (Ford) Motors Vehicles In process of Al Dleil PM-G )‫ طن‬3.5-2.5 ‫قالبات جك ( سعة‬ 1 20-Aug-15 24-Aug-15 8-Oct-15 8-Oct-15 90 100% Trading delivery Co.(Mitsubishi) Al Dleil PM-G ‫الية رش بالتبخر‬ 1 6-Jul-15 23-Jul-15 29-Jul-15 29-Jul-15 1 100% completed Almanjal company Motors Vehicles In process of Al Dleil PM-G 3‫م‬18 ‫كابسات Ù†Ù?ايات‬ 1 8-Aug-15 13-Aug-15 22-Oct-15 23-Oct-15 150 0% Trading delivery Co.(Mitsubishi) Al Dleil Al Dleil PM-W ‫انشطة مختلÙ?ة‬ 1 ALRajef completed from PM-W ‫قاعة اجتماعات‬ 1 1-Jan-00 13-Dec-15 23-Jan-16 160 100% Contracting 2015 grant Company Al Dleil PM-W ‫ملعب خماسي‬ 1 11-Sep-15 26-Oct-15 9-Dec-15 13-Dec-15 180 100% Telal Alkarak Al Dleil Alnsour & Alzghoul Al Merad CVDB-W ‫Ù?تح Ùˆ تعبيد شوارع خلطات اسÙ?لتية‬ 1 11-May-15 10-Jun-15 6-Jul-15 13-Jul-15 100 100% Completed Company Under Al Merad CVDB-W ‫ارصÙ?Ø© واطاريÙ?‬ 1 13-Jul-15 12-Aug-15 7-Sep-15 24-Oct-15 130 85% Alquds kubra Implementaion Al Merad CVDB-W Al Merad PM-G 4*4 ‫بكب‬ 3 2-Sep-15 6-Sep-15 6-Oct-15 6-Oct-15 15 100% Delivered Mitsubishi Al Merad PM-G Under Alnsour & Alzghoul Al Merad PM-W ‫خلطة اسÙ?لتية واعادة انشاء‬ 1 21-Oct-15 27-Oct-15 9-Nov-15 26-Nov-15 60 65% Implementaion Company ‫البلديه‬ ‫نوع العطاء‬ ‫المشروع‬ ‫الكمية‬ ‫تاريخ االعالن بالجريدة‬ ‫تاريخ Ù?تح العروض‬ ‫تاريخ توقيع االحالة‬ ‫تاريخ البداية‬ ‫مدة التنÙ?يذ‬ % ‫المالحظات‬ ‫اسم المقاول‬ Al Merad PM-W ‫انشطة مختلÙ?ة‬ 1 Al Merad PM-W Ajloun CVDB-G ‫تركتور رباعي الدÙ?ع‬ 2 12-Apr-15 11-May-15 10-Jun-15 10-Jun-15 120 100% completed Almanjal Ajloun Ajloun CVDB-W ‫خلطة اسÙ?لتية‬ 1 18-May-15 15-Jun-15 9-Jul-15 11-Aug-15 50 95% completed Khaled Alrjoub Ajloun CVDB-W ‫خلطة اسÙ?لتية‬ 1 21-Dec-15 18-Jan-16 7-Feb-16 7/31/2016 30 100 completed Mohannad AlMoghrabi Ajloun Raáfat Quraán Ajloun PM-G ‫حاويات Ù†Ù?ايات‬ 350 27-May-15 4-Jun-15 21-Jun-15 22-Jun-15 40 100% completed Company Ajloun PM-G ‫ طن‬5 ‫مدحلة‬ 1 8-Jun-15 15-Jul-15 90 0% completed ATCO company 18-Jan-16 16-Feb-16 Ajloun PM-G 4*4 ‫بكب كابينة مزدوجة‬ 1 24-Jun-15 2-Jul-15 30 0% completed Mitsubishi 15-Dec-15 22-Dec-15 ‫Ù?رق محروقات عطاء الخلطة‬ 1 Ajloun PM-W ‫انشطة مختلÙ?ة‬ 1 CVDB- Zarqa ‫تراكتور رش سائل‬ 1 12-Apr-15 11-May-15 14-Jun-15 10-Jun-15 120 100% Completed Almanjal G Zarqa CVDB-G berfelia under Zarqa CVDB ‫انشاء معرض منتوجات‬ 1 7-May-16 5-Jun-16 10-Jul-16 22-Aug-16 180 40% contracting implementation company CVDB ‫البلديه‬ ‫نوع العطاء‬ ‫المشروع‬ ‫الكمية‬ ‫تاريخ االعالن بالجريدة‬ ‫تاريخ Ù?تح العروض‬ ‫تاريخ توقيع االحالة‬ ‫تاريخ البداية‬ ‫مدة التنÙ?يذ‬ % ‫المالحظات‬ ‫اسم المقاول‬ Zarqa PM-G 475 ‫حاويات عدد‬ 700 23-Aug-15 13-Sep-15 29-Dec-15 29-Dec-16 120 100% Completed Saleh Mashaál Zarqa PM-G 2‫م‬18 ‫ضاغطة‬ 1 25-Jul-15 1-Sep-15 28-Dec-15 8-Mar-16 150 100% Completed MAN Zarqa PM-G 3‫م‬16 ‫ضاغطة‬ 1 25-Jul-15 21-Dec-15 3-Jan-16 13-Feb-16 150 100% Completed MAN Zarqa PM-G 3‫م‬14 ‫ضاغطة‬ 2 5-Mar-16 13-Mar-16 16-Jun-16 18-Jun-16 150 100% Completed Zarqa PM-G 3‫م‬12 ‫ضاغطة‬ 2 6-Sep-15 20-Sep-15 29-Dec-15 20-Jan-16 150 100% Completed Jamal Alasbah Zarqa PM-G 3‫م‬10 ‫ضاغطة‬ 2 6-Sep-15 20-Sep-15 29-Dec-15 12-Jan-16 150 100% Completed Jamal Alasbah Motors Vehicles Zarqa PM-G ‫ طن‬10 ‫قالب‬ 4 14-Sep-15 6-Oct-15 19-Dec-15 19-Dec-15 30 100% Completed Trading Company ‫لودر‬+12.5 ‫معدات انشائية (لودر‬ Zarqa PM-G 1 14-Sep-15 6-Oct-15 8-Jan-16 3-Mar-16 90 100% Completed CAT )‫باكو لودر‬+17.5 Zarqa PM-G 4*4 ‫بكب‬ 5 14-Sep-15 6-Oct-15 15-Feb-16 18-Feb-16 90 100% Completed Mitsubishi Zarqa PM-G ‫جهاز رش تبخير‬ 1 14-Sep-15 6-Oct-15 8-Jan-16 3-Mar-16 60 100% Completed Almanjal Zarqa PM-G 4*4 ‫بكب‬ 1 16-Mar-16 21-Apr-16 26-May-16 23-Jun-16 30 100% Completed ‫البلديه‬ ‫نوع العطاء‬ ‫المشروع‬ ‫المشروع‬ ‫تاريخ االعالن بالجريدة الكمية‬ ‫تاريخ Ù?تح العروض‬ ‫تاريخ توقيع االحالة‬ ‫تاريخ البداية‬ ‫مدة التنÙ?يذ‬ ‫تاريخ االنتهاء‬ % ‫المالحظات‬ ‫اسم المقاول‬ Irbid CVDB-W Paving ‫اعمال خلطة اسÙ?لتية‬ 1 1-Jun-15 1-Jul-15 13-Jul-15 10-Aug-15 75 24-Oct-15 100% Completed Khaled Rjoub Irbid CVDB-W Paving ‫اعمال خلطة اسÙ?لتية‬ 1 16-Jul-15 17-Aug-15 10-Sep-15 11-Oct-16 75 20-May-16 100% Completed Khaled Rjoub Irbid CVDB-W Opening New Roads ‫Ù?تح Ùˆ تعبيد شوارع‬ 1 31-May-15 29-Jun-15 13-Jul-15 1-Sep-15 130 1-Apr-16 100% Completed Foa'ad Dweri Irbid CVDB-W Retainng Wall ‫انشاء جدار استنادي‬ 1 16-Jul-15 16-Aug-15 10-Sep-15 17-Oct-16 75 10-May-16 100% Completed Maher Alteibi Under Irbid CVDB-W Opening New Roads ‫Ù?تح Ùˆ تعبيد شوارع‬ 1 15-Feb-16 16-Mar-16 27-Mar-16 2-May-16 120 23-Aug-16 90% implementation/fi Omar Dweri nal invoice Irbid CVDB-W Sub-Total ‫اعمال االنارة ( توريد وحدات‬ alshoaá Irbid PM-G Light Units (LED) 1000 21-Oct-15 5-Nov-15 31-Dec-15 7-Jan-16 90 30-Mar-16 100% Completed led ‫توÙ?ير طاقة‬ Cpmpany VICO Insecticides and ‫توريد مبيدات حشرية ومكاÙ?حة‬ Awarded to 3 MobedcoAgro Irbid PM-G 1 23-Jul-15 6-Aug-15 30-Sep-15 30-Sep-15 20 20-Oct-15 100% Pesticides ‫للقوارض‬ companies chemicals industries SIPES Paint, Irbid PM-G Pavement Paint ‫توريد مواد دهان ارصÙ?ة‬ 1 13-Jul-15 29-Aug-15 29-Sep-15 22-Oct-15 60 21-Dec-15 100% Completed ‫شركة الدولية‬ ‫الزجاجية‬ Pesticides sprayer Telfah Irbid PM-G ‫اجهزة رذاذ رش مبيدات حشرية‬ 5 13-Jul-15 30-Jul-15 5-Nov-15 5-Nov-15 60 7-Jan-16 100% Completed motor Company Electricity crane rising Universal Irbid PM-G ‫راÙ?عة كهرباء‬ 1 25-Jun-15 9-Jul-15 22-Oct-15 22-Oct-15 150 20-Mar-16 100% Completed 25 meters Equipment Co. Vehicle Irbid PM-G Long Hase Pick ups ‫بكب شاصي طويل‬ 4 7-Jul-15 23-Jul-15 15-Nov-15 15-Nov-15 90 7-Jan-16 100% Completed trading company Alqudra Vehicles Irbid PM-G Pick Up 4x4 ‫ غرÙ?Ø© مزدوجة‬4*4 ‫بكب‬ 8 7-Jul-15 22-Oct-15 7-Jan-16 27-Dec-15 90 26-Mar-16 100% Completed trading Company Abu Zakieh Purchase of hearse Irbid PM-G ‫باص نقل موتى‬ 4 13-Jul-15 17-Sep-15 14-Jan-16 20-Jan-16 20 14-Mar-16 100% Completed for vehicles Vehicle trading Integrated Waiting Taxes Irbid PM-G Water Tank (30 m3) )3‫ م‬30( ‫صهريج مياه سعة‬ 1 30-Jul-15 10-Sep-15 23-Dec-15 1-Jan-16 180 25-Jun-16 100% Automative Exemption Company Irbid PM-G Sub-Total Surface Water Irbid PM-W ‫قنوات تصريÙ? مياه االمطار‬ 1 8-Jun-16 23-Jun-16 4-Aug-16 9-Aug-16 90 23-Oct-16 100% Awarded ‫شركة خالد الزعبي‬ Drainage Emergency Irbid PM-W ‫انشطة مختلÙ?ة‬ 1 Expenses Irbid PM-W Sub-Total Irbid PM Total Grand Irbid Total ‫البلديه‬ ‫نوع العطاء‬ ‫المشروع‬ ‫المشروع‬ ‫تاريخ االعالن بالجريدة الكمية‬ ‫تاريخ Ù?تح العروض‬ ‫تاريخ توقيع االحالة‬ ‫تاريخ البداية‬ ‫مدة التنÙ?يذ‬ ‫تاريخ االنتهاء‬ % ‫المالحظات‬ ‫اسم المقاول‬ West Irbid CVDB-W Paving ‫خلطة اسÙ?لتية‬ 1 21-May-15 22-Jun-15 13-Jul-15 22-Aug-15 60 28-Dec-15 95% final Invoice Ziad alsakran West Irbid Sub-Total Raáfat Qoraán West Irbid PM-G Containers ‫حاويات معدنية‬ 45 23-Jun-15 30-Jun-15 30-Jun-15 1-Jul-15 9 10-Jul-15 100% Completed Company Abdullah Alzaubi West Irbid PM-G Kanderin Stone ‫حجر كندرين‬ 1 1-Jul-15 16-Aug-15 16-Aug-15 17-Aug-15 60 8-Sep-15 100% Completed Company West Irbid PM-G Parks Rehabilitation ‫تطوير حدائق‬ 1 7-Jul-15 16-Aug-15 30-Aug-15 31-Aug-15 30 12-Oct-15 100% Completed ammar alnatour Light Units Completed West Irbid PM-G ‫وحدات انارة‬ 150 18-Jun-15 25-Jun-15 25-Jun-15 26-Jun-15 4 30-Jun-15 100% Saif For lighting +maintanence material for 2 companies West Irbid PM-G Sub-Total West Irbid PM-W Emergency Expenses ‫انشطة مختلÙ?ة‬ 1 due to the defecet West Irbid PM-W Sub-Total West Irbid PM-W PM Sub-Total Grand West Irbid Total ‫البلديه‬ ‫نوع العطاء‬ ‫المشروع‬ ‫المشروع‬ ‫تاريخ االعالن بالجريدة الكمية‬ ‫تاريخ Ù?تح العروض‬ ‫تاريخ توقيع االحالة‬ ‫تاريخ البداية‬ ‫مدة التنÙ?يذ‬ ‫تاريخ االنتهاء‬ % ‫المالحظات‬ ‫اسم المقاول‬ feras rasheed w Ramtha CVDB-W Paving ‫خلطة االسÙ?لتية ساخنة‬ 1 8-Jun-15 7-Jul-15 27-Jul-15 22-Aug-15 75 1-May-16 100% Completed abdullah abu halemeh Monther Surface Water Ramtha CVDB-W ‫قنوات تصريÙ? مياه االمطار‬ 1 8-Jun-15 9-Jul-15 2-Sep-15 4-Oct-15 90 1-Mar-16 100% Completed Almanaseer Drainage Company Ramtha CVDB-W Paving ‫خلطة اسÙ?لتية‬ 1 26-Jan-16 23-Feb-16 8-Mar-16 16-Mar-16 20 16-May-16 100% Completed Sadeq Hussein Ramtha CVDB-W Sub-Total Ramtha PM-W Emergency Expenses ‫انشطة مختلÙ?ة‬ 1 100% Completed Pedestrian Steel Mahmoud Ramtha PM-W ‫جسر معدني للمشاه‬ 1 30-Jul-15 10-Aug-15 10-Aug-15 6-Sep-15 60 5-Nov-15 100% Completed Bridge Salman Oqleh Mahmoud Ramtha PM-W Concrete Barriers ‫حواجز اسمنتية‬ 1 12-Nov-15 16-Nov-15 16-Nov-15 12-Jan-16 30 9-Feb-16 100% Completed Salman Oqleh Ramtha CVDB-W Paving ‫خلطة اسÙ?لتية‬ 1 31-Jul-16 1-Sep-16 23-Oct-16 26-Oct-16 30 27-Dec-16 9-Apr-1900 Completed Sadeq Hussein Pipes Culverts Khaled Alzou'bi & Ramtha PM-W ‫صيانة عبارات انبوبية‬ 1 29-Oct-15 9-Nov-15 14-Nov-15 15-Nov-15 15 28-Nov-15 100% Completed Maintainance Co. Ramtha PM-W Sub-Total Ramtha PM-G Suppluing Basecoarse ‫توريد مواد Ù?رشيات للشوارع‬ 1 5-Aug-15 10-Aug-15 10-Aug-15 24-Aug-15 15 8-Sep-15 100% Completed Sadeq Hussein ‫Ù?رق عطاء محروقات للخلطة‬ Contingency of Paving 1 100% Completed 2016 Kendrine Stones Haider Ramtha PM-G ‫توريد مواد حجر كندرين‬ 1 27-Aug-15 1-Sep-15 7-Sep-15 10-Oct-15 15 24-Oct-15 100% Completed Materials Daqamsheh Ramtha PM-G Sub-Total Ramtha PM Total Grand Ramtha Total ‫البلديه‬ ‫نوع العطاء‬ ‫المشروع‬ ‫المشروع‬ ‫تاريخ االعالن بالجريدة الكمية‬ ‫تاريخ Ù?تح العروض‬ ‫تاريخ توقيع االحالة‬ ‫تاريخ البداية‬ ‫مدة التنÙ?يذ‬ ‫تاريخ االنتهاء‬ % ‫المالحظات‬ ‫اسم المقاول‬ Tractor for pesticides Houran CVDB-G ‫تراكتور رش مبيدات حشرية‬ 1 12-Apr-15 11-May-15 10-Jun-15 10-Jun-15 120 12-Oct-15 100% Completed Almanjal spray 4 * 4 Houran CVDB-G Sub-Total ‫Ù?تح وتعبيد شوارع واعادة انشاء‬ Ziad Alsakran Houran CVDB-W Opening New Roads 1 11-May-15 8-Jun-15 18-Jun-15 16-Jul-15 120 13-Nov-15 100% Completed ‫شوارع‬ Company Issa Alrjoub Houran CVDB-W Paving ‫خلطة اسÙ?لتية ساخنة‬ 1 11-May-15 9-Jun-15 17-Jun-15 1-Sep-15 60 3-Nov-15 100% Completed Company Houran CVDB-W Sub-Total Houran CVDB-W CVDB Total Houran PM-G Pick ups 4*4 ‫بك اب‬ 1 10-Sep-15 23-Dec-15 21-Jan-16 31-Jan-16 90 8-May-16 100% Completed Azzurro Foundation Houran Sub-Total Foaád Omar Houran PM-W Curbs and Sidewalks ‫ارصÙ?Ø© واطاريÙ?‬ 1 26-Jul-15 24-Aug-15 30-Aug-15 30-Sep-15 60 29-Nov-15 100% Awarded dweiri Houran PM-W Paving ‫خلطة اسÙ?لتية ساخنة‬ 1 31-May-16 14-Jun-16 14-Jun-16 23-Aug-16 90 29-Sep-16 100% Completed Sadeq Hussein Houran PM-W Emergency Expenses ‫انشطة مختلÙ?ة‬ 1 due to the defects Houran PM-W Labor Payment ‫اجور عمال‬ 1 1/1/2015 360 25-Aug-15 100% Completed Houran PM-W Sub-Total Houran PM Total Grand Houran Total ‫البلديه‬ ‫نوع العطاء‬ ‫المشروع‬ ‫المشروع‬ ‫تاريخ االعالن بالجريدة الكمية‬ ‫تاريخ Ù?تح العروض‬ ‫تاريخ توقيع االحالة‬ ‫تاريخ البداية‬ ‫مدة التنÙ?يذ‬ ‫تاريخ االنتهاء‬ % ‫المالحظات‬ ‫اسم المقاول‬ Sadeq Hussein Mafraq CVDB-W Paving ‫خلطة اسÙ?لتية‬ 1 1-Jul-15 4-Aug-15 2-Sep-15 4-Oct-15 90 100% completed Company Opening New Roads Mafraq CVDB-W ‫مشروع Ù?تح وتعبيد‬ 1 1-Jul-15 3-Aug-15 2-Sep-15 9-Nov-15 90 100% completed Sa'ad Aloleimat and Paving Mafraq CVDB-W Paving ‫خلطة اسÙ?لتية‬ 1 21-Jan-16 18-Feb-16 8-Mar-16 20-Apr-16 100% completed Ziad Alsakran Mafraq CVDB-W Sub-Total In process of Mafraq PM-G Refrigerated vehicles ‫سيارة مبردة لنقل اللحوم‬ 1 7-Jun-15 17-Jun-15 1-Mar-16 31-Mar-16 30 100% Turkish Jordanian delivery Construction Equipment (loader Mafraq PM-G ‫جراÙ?Ø© كتربلر‬ 2 18-Oct-15 29-Oct-15 24-Jan-16 4-Feb-16 90 4-Feb-16 100% completed CAT 12.5+loader 17.5+backhoe loader) Tawfeeq Mafraq PM-G Electricity crane ‫راÙ?عة هيدرولوكية‬ 1 7-Jun-15 23-Aug-15 1-Jan-16 11-Jan-16 150 14-Jan-16 100% completed Gharghour Mafraq PM-G Pick ups 4*4 ‫بكب دبل كبين‬ 2 7-Jun-15 17-Jun-15 14-Dec-15 29-Dec-15 90 21-Jan-16 100% Completed Mitsubishi Trucks (10 ton Universal Equip. Mafraq PM-G ‫قالب سنجل‬ 2 7-Jun-15 23-Aug-15 20-Jan-16 22-Feb-16 90 17-Aug-16 100% completed Capacity ) Company Mafraq PM-G Streets sweeper ‫كالسة او كاسحة‬ 1 18-Oct-15 29-Oct-15 1-Feb-16 7-Feb-16 120 17-Aug-16 100% completed Alquds electricity Generator Ramadan PM-G ‫مقص زÙ?تة Ùˆ مولد كهرباء‬ 5-Sep-16 12-Sep-16 17-Sep-16 17-Sep-16 30 5-Oct-16 100% completed and Asphalt scissors Company Mafraq PM-G Compactors(18 )m3 ‫م‬18 ‫ضاغطات سعة‬ 1 23-Dec-15 3-Jan-16 31-Mar-16 10-Apr-16 150 17-Aug-16 100% completed MAN Mafraq PM-G Sub-Total 0 Mafraq Works Mafraq PM-W Emergency Expenses ‫انشطة مختلÙ?ة‬ 1 100% completed Box culverts & storm ‫عبارة صندوقية Ùˆ Ù?نوات تصريÙ?‬ Mafraq PM-W 1 16-Sep-15 29-Sep-15 26-Feb-16 30/2/2016 120 21-Jun-16 100% completed Mwaffaq Shdeifat water channel ‫مياه امطار‬ Box culverts & storm ‫عبارة صندوقية Ùˆ Ù?نوات تصريÙ?‬ Mafraq PM-W 1 100% completed water channel 2014 ‫مياه امطار‬ contingency of 2014 2014 ‫مدات خرسانية‬ 1 completed Concrete subbase ‫احتياط لعمل مشروع تنظيÙ?‬ Mafraq PM-W Cleaning Services 1 completed ‫شوارع‬ Mafraq PM-W Paving fuel difference 2016 ‫Ù?رق محروقات عطاء‬ 1 completed Mafraq PM Total Grand Mafraq Total ‫البلديه‬ ‫نوع العطاء‬ ‫المشروع‬ ‫المشروع‬ ‫تاريخ االعالن بالجريدة الكمية‬ ‫تاريخ Ù?تح العروض‬ ‫تاريخ توقيع االحالة‬ ‫تاريخ البداية‬ ‫مدة التنÙ?يذ‬ ‫تاريخ االنتهاء‬ % ‫المالحظات‬ ‫اسم المقاول‬ 01-Jul-15 02-Aug-15 Bal'ama CVDB-W Opening New Roads ‫Ù?تح وتعبيد شوارع‬ 1 2-Sep-15 9-Nov-15 120 9-Oct-16 100% Completed Saád Aloleimat Bal'ama CVDB-W Paving ‫خلطة اسÙ?لتية‬ 1 2-Nov-15 30-Nov-15 31-Dec-15 15-Feb-16 90 11-Apr-16 100% Completed Ziad Alsakran Bal'ama Sub-Total Bal'ama PM-G Containers ‫حاويات Ù†Ù?ايات‬ 150 6-Oct-15 20-Oct-15 30-Oct-15 21-Nov-15 60 19-Apr-16 100% Completed Alaáraida Bal'ama PM-G Pick Up 4x4 ‫بكب دبل كبين‬ 2 6-Oct-15 20-Oct-15 20-Sep-15 30-Sep-15 60 20-Apr-16 100% Completed Mitsubishi Bal'ama PM-G Steel-Wheel Roller 5T ‫ طن‬5 ‫مدحلة‬ 1 5-Sep-15 20-Sep-15 5-Apr-16 20-Apr-16 120 100% Completed ATICO Bal'ama PM-G Sub-Total Bal'ama Works Bal'ama PM-W Emergency Expenses ‫انشطة مختلÙ?ة‬ 1 Bal'ama PM-W Sub-Total Bal'ama PM Total Grand Bal'ama Total ‫البلديه‬ ‫نوع العطاء‬ ‫المشروع‬ ‫المشروع‬ ‫تاريخ االعالن بالجريدة الكمية‬ ‫تاريخ Ù?تح العروض‬ ‫تاريخ توقيع االحالة‬ ‫تاريخ البداية‬ ‫مدة التنÙ?يذ‬ ‫تاريخ االنتهاء‬ % ‫المالحظات‬ ‫اسم المقاول‬ AL-Sarhan PM-G Pick Up 4x4 4*4 ‫بكب‬ 1 30-Aug-15 15-Sep-15 12-Oct-15 12-Oct-15 90 24-Jan-16 100% completed Ford company AL-Sarhan PM-G Sub-Total AL-Sarhan PM-W Emergency Expenses ‫انشطة مختلÙ?ة‬ 1 Muhannad Douiri AL-Sarhan PM-W Opening New Roads ‫Ù?تح وتعبيد شوارع‬ 1 23-Jun-15 29-Jun-15 12-Jul-2015 28-Aug-15 120 15-Mar-16 100% Completed company Uder Sadeq Hussein AL-Sarhan PM-W Paving ‫خلطة اسÙ?لتية‬ 1 23-Jun-15 29-Jun-15 12-Jul-2015 30-Aug-15 45 18-Nov-15 100% Implementaion Company Uder AL-Sarhan PM-W Cemetry Maintenance ‫صيانة المقابر‬ 1 19-Jul-15 26-Jul-15 27-Jul-15 20-Aug-15 90 20-Apr-16 100% Rakan Tarawneh Implementaion AL-Sarhan PM-W Paving (new) ‫خلطة اسÙ?لتية‬ 1 10-Sep-15 21-Sep-15 21-Sep-15 21-Oct-15 60 16-Feb-16 100% Completed Ziad Alsakran Fayez Alqaisy & AL-Sarhan PM-W Opening New Roads ‫Ù?تح وتعبيد شوارع‬ 1 10-Sep-15 21-Sep-15 21-Sep-15 17-Oct-15 60 1-Dec-15 100% Awarded alheil patner AL-Sarhan PM-W Labour Fees ‫اجور عمال وطن‬ 1 20% Ongoing Khaled & Faisal AL-Sarhan PM-W Hanger ‫بناء هنجر‬ 1 14-Jul-15 27-Jul-15 8-Sep-15 19-Oct-15 60 75% 135,930 Almaraya Company AL-Sarhan PM-W Sub-Total Grand AL-Sarhan Total ‫البلديه‬ ‫نوع العطاء‬ ‫المشروع‬ ‫المشروع‬ ‫تاريخ االعالن بالجريدة الكمية‬ ‫تاريخ Ù?تح العروض‬ ‫تاريخ توقيع االحالة‬ ‫تاريخ البداية‬ ‫مدة التنÙ?يذ‬ ‫تاريخ االنتهاء‬ % ‫المالحظات‬ ‫اسم المقاول‬ 50000 JD variation Al Za'atari and Opening New Roads ‫اعمال Ù?تح وتعبيد مع خلطة اسÙ?لتية‬ amount funded by CVDB-W 1 9-Aug-15 6-Sep-15 12-Oct-15 22-Nov-15 120 14-May-2016 100% Anwar abu shalfa Mansheya and Paving ‫ساخنة‬ municipality completed Al Za'atari and CVDB-W Park ‫انشاء ملعب تدريب‬ 1 13-Oct-15 11-Nov-15 15-Dec-15 1-Feb-16 90 21-Aug-2016 100% completed Aied Alarda Mansheya Al Za'atari and CVDB-W Sub-Total Mansheya Al Za'atari and ‫تركيب نجيل اصطناعي للملعب‬ PM-W Parks' Rehabilitation 1 0% Cancelled Mansheya ‫البلدي مع كشاÙ?ات انارة‬ Al Za'atari and PM-W Emergency Expenses ‫انشطة مختلÙ?ة‬ 1 100% Due to the defects Mansheya Al Za'atari and PM-W Sub-Total Mansheya Al Za'atari and Grand Mansheya Total ‫البلديه‬ ‫نوع العطاء‬ ‫المشروع‬ ‫المشروع‬ ‫تاريخ االعالن بالجريدة الكمية‬ ‫تاريخ Ù?تح العروض‬ ‫تاريخ توقيع االحالة‬ ‫تاريخ البداية‬ ‫مدة التنÙ?يذ‬ ‫تاريخ االنتهاء‬ % ‫المالحظات‬ ‫اسم المقاول‬ Hosha CVDB-W Paving ‫خلطة اسÙ?لتية‬ 1 18-May-15 17-Jun-15 28-Jun-15 22-Aug-15 60.00 21-Oct-15 100% completed Alsadeq Company Hosha CVDB-W Sub-Total commercial Hosha PM-G Pick Up 4*4 ‫بكب كابينة مزدوجة‬ 1 16-Jul-15 28-Jul-15 28-Jul-15 7-Sep-15 20 20-Mar-16 100% completed company commercial Hosha PM-G Pick Up 4*4 ‫بكب كابينة مزدوجة‬ 1 3-Oct-15 8-Oct-15 20-Oct-15 11-Jan-16 30 20-Mar-16 100% completed company Hosha PM-G Sub-Total Hosha PM-W Emergency Expenses ‫انشطة مختلÙ?ة‬ 1 Mahmoud Hosha PM-W Park ‫حديقة منطقة حوشا‬ 1 9-Jun-15 15-Jun-15 29-Jun-15 28-Jul-15 90 26-Oct-2015 100% Completed Suleiman Oqleh Hosha PM-W Opening New Roads ‫Ù?تح وتعبيد شوارع‬ 1 21-May-15 27-May-15 10-Jun-15 21-Jun-15 120 19-Oct-15 100% Completed Ayyash Abu Alees Rakan Al Hosha PM-W Curbs and Sidewalks ‫ارصÙ?Ø© واطاريÙ?‬ 1 16-Jul-15 30-Jul-15 10-Aug-15 30-Sep-15 90 24-Aug-16 95% final invoice Tarawneh Hosha PM-W Sub-Total Hosha PM Total Hosha Grand Hosha Total