The World Bank Implementation Status & Results Report Innovation in Solar Power and Hybrid Technologies (P160379) Innovation in Solar Power and Hybrid Technologies (P160379) SOUTH ASIA | India | Energy & Extractives Global Practice | IBRD/IDA | Investment Project Financing | FY 2019 | Seq No: 3 | ARCHIVED on 29-Jun-2020 | ISR42352 | Implementing Agencies: Solar Energy Corporation of India Limited, DEPARTMENT OF ECONOMIC AFFAIRS Key Dates Key Project Dates Bank Approval Date: 29-Mar-2019 Effectiveness Date: -- Planned Mid Term Review Date: 11-Jul-2022 Actual Mid-Term Review Date: Original Closing Date: 31-Dec-2024 Revised Closing Date: 31-Dec-2024 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objectives (PDO) are to demonstrate the operational and economic feasibility of utility-scale innovative renewable energy technologies and battery energy storage solutions, and to strengthen institutional capacity to facilitate scale-up of such technologies on a commercial basis in India. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Component A: Investments in Innovative RE Technologies & BESS (Estimated Cost: US$398 million of which IBRD Loan: US$150 million; CTF loan: US$28 million; and CTF Grant: US$20 million):(Cost $398.00 M) Component B: Technical Assistance, Capacity Building, Implementation Support, Monitoring and Dissemination (Estimated Cost: US$1.81 million of which CTF Grant: US$1.81 million):(Cost $1.81 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Substantial Substantial Implementation Status and Key Decisions This is the third ISR after the approval of the project on March 29, 2019. The legal agreements are expected to be signed and made effective after SECI has completed the 30% procurement award before loan signing as per DEA's requirements and the Ministry of Finance completes its deliberation on the sovereign guarantee fee on the two loans (IBRD and CTF) charged to SECI. 6/29/2020 Page 1 of 7 The World Bank Implementation Status & Results Report Innovation in Solar Power and Hybrid Technologies (P160379) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Low Low Moderate Macroeconomic Low Low High Sector Strategies and Policies Substantial Substantial Substantial Technical Design of Project or Program Moderate Moderate Moderate Institutional Capacity for Implementation and Substantial Substantial Substantial Sustainability Fiduciary Substantial Substantial Substantial Environment and Social Substantial Substantial Substantial Stakeholders Moderate Moderate Moderate Other -- -- -- Overall Substantial Substantial Substantial Results PDO Indicators by Objectives / Outcomes Demonstrate Operational & Economic Feasibility of Utility-Scale Innovative RE Technologies & BESS IN00859151 ►Generation Capacity of Renewable Energy (other than hydropower) constructed (Megawatt, Corporate) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 400.00 Date 29-Mar-2019 05-Dec-2019 16-Jun-2020 31-Dec-2024 This measures the capacity of renewable energy (other than hydropower) constructed under the project. Comments: The TTL should specify the type of renewable power (i) wind; (ii) geothermal; (iv) solar; or (iv) other. For hydropower refer to code Hydropower (LH). The baseline value for this indicator will be zero. IN00859154 Generation Capacity of Renewable Energy constructed - Other (Megawatt, Corporate Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 400.00 Date 29-Mar-2019 05-Dec-2019 16-Jun-2020 31-Dec-2024 IN00859155 6/29/2020 Page 2 of 7 The World Bank Implementation Status & Results Report Innovation in Solar Power and Hybrid Technologies (P160379) ►Renewable Energy generated (in megawatt hours) (Megawatt hour(MWh), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 764,550.00 Date 29-Mar-2019 05-Dec-2019 16-Jun-2020 31-Dec-2024 Comments: This indicator measures actual energy generated from the subprojects supported under this Project. IN00859156 ►Greenhouse Gas Emissions Avoided (tons of CO2 equivalent per year) (Tones/year, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 510,000.00 Date 29-Mar-2019 05-Dec-2019 16-Jun-2020 31-Dec-2024 Comments: This indicator calculates Greenhouse Gas (GHG) emissions avoided for all subprojects. Strengthen Institutional Capacity to Facilitate Scale-Up of Such Technologies on a Commercial Basis IN00859152 ►Each solution (hybrid, floating solar PV and battery energy storage) demonstrated at least once through subprojects (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Mar-2019 05-Dec-2019 16-Jun-2020 31-Dec-2024 Each solution (hybrid, floating solar PV and battery energy storage) demonstrated at least once through Comments: subprojects IN00859153 ►Regulations, codes or standards for battery energy storage solutions issued (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Mar-2019 05-Dec-2019 16-Jun-2020 31-Dec-2024 Comments: Regulations and/or codes and/or standards for battery energy storage solutions issued in the country Intermediate Results Indicators by Components Investments in Innovative Renewable Energy Technologies and Battery Energy Storage Solutions IN00859157 ►Installed Generation Capacity of Hybrid Power Plants (Megawatt, Custom) Baseline Actual (Previous) Actual (Current) End Target 6/29/2020 Page 3 of 7 The World Bank Implementation Status & Results Report Innovation in Solar Power and Hybrid Technologies (P160379) Value 0.00 0.00 0.00 300.00 Date 29-Mar-2019 05-Dec-2019 16-Jun-2020 31-Dec-2024 Comments: Installed generation capacity of hybrid power plants by SECI with financing from ISHTP. IN00859159 ►Installed Generation Capacity of Floating Solar PV Power Plants (Megawatt, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 100.00 Date 29-Mar-2019 05-Dec-2019 16-Jun-2020 31-Dec-2024 Comments: Installed generation capacity of floating solar PV power plants by SECI with financing from ISHTP. IN00859161 ►Number of MW/MWh-Scale Battery Energy Storage Solutions Installed (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 29-Mar-2019 05-Dec-2019 16-Jun-2020 31-Dec-2024 Comments: Installed number of battery energy storage solutions by SECI with financing from ISHTP. IN00859163 ►Grievances received that are addressed within two months of receipt (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 100.00 Date 29-Mar-2019 05-Dec-2019 16-Jun-2020 31-Dec-2024 This indicator measures the grievances/complaints received and percentage addressed within a period of Comments: two months from the date of receipt. Technical Assistance, Capacity Building, Implementation Support, Monitoring and Dissemination IN00859158 ►Number of Market Sounding, Workshops and Other Dissemination Activities Completed (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 1.00 15.00 Date 29-Mar-2019 05-Dec-2019 16-Jun-2020 31-Dec-2024 The number of workshops, market sounding and other dissemination activities implemented by SECI using ISHTP financing. One stakeholder consultation on Chhattisgarh 100 MW AC solar with 50 MW/150 Comments: MWh battery energy storage solution was conducted by SECI on May 15, 2020. IN00859160 6/29/2020 Page 4 of 7 The World Bank Implementation Status & Results Report Innovation in Solar Power and Hybrid Technologies (P160379) ►Number of Stakeholders Informed and Consulted Through Market Sounding and Dissemination Activities (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 50.00 250.00 Date 29-Mar-2019 05-Dec-2019 16-Jun-2020 31-Dec-2024 The number of stakeholders participating in dissemination activities and stakeholder consultations implemented by SECI for ISHTP-supported innovative solutions. A stakeholder consultation for Comments: Chhattisgarh solar with battery project was organized by SECI on May 15, 2020. IN00859162 ►Number of Innovative Battery Energy Storage and Renewable Energy Subprojects Implemented (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 3.00 Date 29-Mar-2019 05-Dec-2019 16-Jun-2020 31-Dec-2024 Comments: The number of subprojects implemented by SECI using ISHTP financing. IN00859164 ►Number of Types of Innovative Battery Energy Storage and Renewable Energy Solutions Demonstrated (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 3.00 Date 29-Mar-2019 05-Dec-2019 16-Jun-2020 31-Dec-2024 The number of types of innovative solutions demonstrated by SECI using ISHTP financing. Comments: IN00859165 ►Number of Standard Procurement Documents for Innovative Solutions Developed (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 3.00 Date 29-Mar-2019 05-Dec-2019 16-Jun-2020 31-Dec-2024 The number of standard procurement documents developed for innovative solutions that have been Comments: demonstrated by SECI using ISHTP financing. IN00859166 ►Number of Detailed Project Reports/Feasibility Studies for Innovative Battery Energy Storage and Renewable Energy Projects Prepared (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 1.00 1.00 2.00 4.00 Date 29-Mar-2019 05-Dec-2019 16-Jun-2020 31-Dec-2024 Technical reports prepared for innovative RE projects. DPRs for Ramagiri (AP) and Rajnandgaon Comments: (Chhattisgarh) drafted by SECI. IN00859167 6/29/2020 Page 5 of 7 The World Bank Implementation Status & Results Report Innovation in Solar Power and Hybrid Technologies (P160379) ►Study to Develop Career path for women employees in SECI and Implementation of Recommendations of such Study (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 29-Mar-2019 05-Dec-2019 16-Jun-2020 31-Dec-2024 Study to be completed by Year 2 and the implementation of the recommendations to be implemented by Comments: Year 4 of the project period IN00859168 ►Percentage of women in total workforce of SECI (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 20.00 20.00 20.00 30.00 Date 29-Mar-2019 05-Dec-2019 16-Jun-2020 31-Dec-2024 Comments: This indicator will monitor increase in number of women employees in SECI (share of total). IN00859169 ►Percentage of women in technical departments of SECI (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 13.00 13.00 13.00 23.00 Date 29-Mar-2019 05-Dec-2019 16-Jun-2020 31-Dec-2024 Comments: This indicator will monitor increase in number of women in technical departments of SECI (share of total). Performance-Based Conditions Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed Not P160379 IBRD-89440 USD 150.00 150.00 0.00 0.00 150.00 0% Effective Not P160379 TF-A9875 USD 28.00 28.00 0.00 0.00 28.00 0% Effective Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date Not P160379 IBRD-89440 29-Mar-2019 -- -- 31-Dec-2024 31-Dec-2024 Effective 6/29/2020 Page 6 of 7 The World Bank Implementation Status & Results Report Innovation in Solar Power and Hybrid Technologies (P160379) Not P160379 TF-A9875 29-Mar-2019 -- -- 31-Dec-2024 31-Dec-2024 Effective Cumulative Disbursements PBC Disbursement Achievement Disbursed amount in Disbursement % PBC ID PBC Type Description Coc PBC Amount Status Coc for PBC Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 6/29/2020 Page 7 of 7