FOREST CONSERVATION AND SUSTAINABILITY IN THE HEART OF THE COLOMBIAN AMAZON PROJECT – TF018478 PROCUREMENT PLAN I. General 1. Bank’s approval Date of the procurement Plan 2. Date of General Procurement Notice: Dec 09, 2015 3. Period covered by this procurement plan: Until Dec 31, 2017 July 9, 2010 PROCUREMENT Colombia : Forest Conservation and Sustainability in the Heart of the Colombian Amazon PLAN General Information Country: Colombia Bank’s Approval Date of the Original Procurement Plan: 2017-08- 04 2021-06- Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P144271 GPN Date: 28 Project Name: Forest Conservation and Sustainability in the Heart of the Colombian Amazon Loan / Credit No: TF / 18478, TF / A5789, TF / B1287 NATURAL HERITAGE FUND FOR BIODIVERSITY AND AREAS Executing Agency(ies): WORKS Activity Reference No. Procurement Estimate Actual Draft Pre- Draft Bidding Specific Bid Evaluation Loan / Credit Market Procurement Prequalificatio High SEA/SH Process Prequalification Bidding Documents Proposal Submission Contract / Description Component Review Type Method Document d Amount qualification Document / Procurement Notice Report and Signed Contract No. Approach Process n (Y/N) Risk Status Evaluation Report as Issued / Opening / Minutes Completion Type Amount (US$) Documents Justification / Invitation Recommendation (US$) Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planne d CO-PNF-18003-CW-DIR / Component 1 - Protected Construcción Cabaña - Adquisición 2017-06- 2017-06- 2017-07- 2017-06- 2017-12- TF / 18478 Areas Management and Posterior Direct 29,200.00 27,614.48 Finalizado Punto de Control en el directa 13 27 18 01 30 Financial Sustainability PNNSCH - Sector el Guamo CO-PNF-17813-CW-RFB / Construcción de un modulo Component 1 - Protected Solicitud de Single Stage - One 181,366.4 2018-01- 2018-02- 2018-04- 2018-09- del centro de investigación TF / 18478 Areas Management and Posterior Limited 208,929.00 Finalizado cotizaciones Envelope 1 15 20 04 28 ubicado en Puerto Abeja - Financial Sustainability PNN Chiribiquete CO-PNF-31996-CW-RFB / Adecuación Sede Regional Component 1 - Protected de San José del Guaviare (Se Solicitud de Single Stage - One 2017-11- 2018-01- 2018-07- TF / 18478 Areas Management and Posterior Limited 123,963.00 0.00 Cancelado excluye el tramite de cotizaciones Envelope 25 20 19 Financial Sustainability licencia de demolición y construcción, estimadas en USD1.5000) GOODS Activity Reference No. Estimated Draft Pre- Draft Bidding Specific Bid Evaluation Loan / Credit Market Procurement Prequalificatio Actual Process Prequalification Bidding Documents Proposal Submission / Description Component Review Type Method Amount qualification Document / Procurement Notice Report and Signed Contract Contract Completion No. Approach Process n (Y/N) Amount (US$) Status Evaluation Report as Issued / Opening / Minutes (US$) Documents Justification / Invitation Recommendation Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planned Actual CO-PNF-17981-GO-RFQ / Component 2 - Forest Solicitud de Single Stage - One 2017-03- 2017-05- 2017-05- 2017-12- 2017-07- Compra motores fuera de TF / 18478 Governance, Management Posterior Limited 21,482.00 11,124.04 Finalizado cotizaciones Envelope 17 24 24 20 29 borda PPI - 2017 and Monitoring CO-PNF-17822-GO-RFQ / DC-compra de hadware y Component 2 - Forest Solicitud de Single Stage - One 2017-08- 2017-09- 2018-05- 2017-10- 2018-06- software CDS, para el TF / 18478 Governance, Management Posterior Limited 88,889.00 92,226.96 Finalizado cotizaciones Envelope 08 13 07 31 20 fortalecimiento del sistema and Monitoring de información ambiental CO-PNF-31988-GO-DIR / Component 2 - Forest Adquisición 2016-12- 2016-12- 2017-01- 2017-01- 2017-12- 2018-12- Adquisicion Imágenes de TF / 18478 Governance, Management Posterior Direct 62,963.00 57,631.70 Finalizado directa 15 16 19 19 20 29 SR, equipos, software and Monitoring Component 2 - Forest CO-PNF-54228-GO-RFQ / Solicitud de Single Stage - One 2018-04- 2018-05- 2018-06- 2018-06- 2018-09- 2018-06- TF / 18478 Governance, Management Posterior Limited 150.00 123.46 Finalizado adquisición de un GPS cotizaciones Envelope 30 16 11 29 26 29 and Monitoring CO-PNF-54329-GO-RFQ / Component 2 - Forest Adquisición de 250 cajas Solicitud de Single Stage - One 2018-04- 2018-04- 2018-06- 2018-04- 2018-12- 2018-07- TF / 18478 Governance, Management Posterior Limited 8,570.00 8,368.56 Finalizado para muestras de 25 x 10 x cotizaciones Envelope 30 02 12 17 31 16 and Monitoring 5 cms con tapa, en madera. CO-PNF-66548-GO-RFQ / ADQUISICIÓN DE EQUIPOS CÓMPUTO Y PERIFERICOS Component 2 - Forest PARA FORTALECIMIENTO Solicitud de Single Stage - One 2018-07- 2018-08- 2018-08- 2018-10- 2018-10- TF / 18478 Governance, Management Posterior Open - National 88,889.00 48,183.51 Finalizado DEL SIG. CORPORACIÓN cotizaciones Envelope 03 16 22 18 21 and Monitoring PARA EL DESARROLLO SOSTENIBLE DEL NORTE Y ORIENTE AMAZÓNICO - CDA CO-PNF-41763-GO-RFQ / Adquisición de imágenes de Component 3 - Sectoral Solicitud de Single Stage - One 2018-01- 2018-03- 2018-09- sensores remotos (imagines TF / 18478 Programs for Sustainable Posterior Limited 53,571.00 0.00 Cancelado cotizaciones Envelope 28 25 21 satélitales, fotógrafas Landscape Management aéreas, radar y drones) CO-PNF-54230-GO-RFQ / Component 2 - Forest Solicitud de Single Stage - One 2018-05- 2018-06- 2018-10- Radio y antena para el Rdo TF / 18478 Governance, Management Posterior Limited 2,150.00 0.00 Cancelado cotizaciones Envelope 01 19 30 Mirití and Monitoring CO-PNF-17798-GO-RFQ / Adquisición e instalación de Component 1 - Protected Solicitud de Single Stage - One 2017-07- 2017-09- 2017-10- equipos para garantizar la TF / 18478 Areas Management and Posterior Limited 5,556.00 0.00 Cancelado cotizaciones Envelope 26 06 06 radiocomunicación de las Financial Sustainability Nuevas sedes del PNNSCH CO-PNF-17807-GO-RFQ / Component 2 - Forest Solicitud de Single Stage - One 2017-08- 2017-09- 2017-12- Adquisición Equipos y TF / 18478 Governance, Management Posterior Limited 6,926.00 0.00 Cancelado cotizaciones Envelope 01 06 05 Software - 2017 - IDEAM and Monitoring CO-PNF-38838-GO-RFQ / Component 2 - Forest Solicitud de Single Stage - One 2018-01- 2018-03- 2018-09- Computadores portátiles, TF / 18478 Governance, Management Posterior Limited 6,071.00 0.00 Cancelado cotizaciones Envelope 20 17 13 grabadoras de voz y and Monitoring cámaras CO-PNF-66788-GO-DIR / Adquisición de imágenes satelitales de muy alta resolución de las constelaciones PlanetScope, Component 3 - Sectoral Adquisición 2018-07- 2018-07- 2018-08- 2018-08- 2019-08- 2019-08- DigitalGlobe, SkySat y/o TF / 18478 Programs for Sustainable Posterior Direct 51,724.00 47,379.00 Finalizado directa 16 21 27 16 26 15 RapidEye hasta que se Landscape Management complete el valor total definido en este contrato, con un precio unitario por km2 y por tipo de imagen de acuerdo CO-PNF-75475-GO-CP / Adquisición de muebles Component 2 - Forest para la exibición de las Prácticas Single Stage - One 2018-09- 2018-09- 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-11- TF / 18478 Governance, Management Posterior Limited 6,071.00 5,398.18 Finalizado colecciones de madera con comerciales Envelope 20 25 12 18 01 26 31 25 and Monitoring usos pedagogicos en diferentes regiones del país CO-PNF-78398-GO-CP / 5 kit campo: Carpa, aislante, Component 1 - Protected Prácticas Single Stage - One 2018-10- 2019-03- 2018-10- 2018-11- 2019-04- 2018-11- 2019-04- 2018-11- 2019-04- 2019-01- 2019-06- estufa, linterna, morral, TF / 18478 Areas Management and Posterior Open - National 3,571.00 3,586.43 Finalizado comerciales Envelope 18 26 23 08 08 15 23 27 30 31 14 cantimplora, PNN Alto Financial Sustainability Fragua y SFFPMOIA. CO-PNF-78409-GO-RFQ / Adquisición de Bote y motor fuera de borda para 12 personas con Equipo de Salvamento para apoyar las Component 3 - Sectoral actividades de Solicitud de Single Stage - One 2018-10- 2018-11- 2019-03- 2019-01- 2019-06- TF / A5789 Programs for Sustainable Posterior Open - National 18,000.00 14,376.96 Finalizado implementación de los cotizaciones Envelope 16 27 26 28 13 Landscape Management acuerdos de conservación, restauración y no deforestación, en el departamento de Caquetá - CORPOAMAZONIA CO-PNF-81065-GO-CP / Adquisición de reactivos para el procesamiento de muestras biológicas de Component 2 - Forest peces, sangre y cabello Prácticas Single Stage - One 2018-10- 2018-11- 2018-10- 2018-11- 2018-12- 2018-11- 2019-01- 2018-12- 2019-01- 2019-01- 2019-02- TF / 18478 Governance, Management Posterior Open - National 7,143.00 6,782.39 Finalizado (125 muestras de pecese comerciales Envelope 25 11 30 15 06 21 09 06 18 16 13 and Monitoring para ser analizadas, 200 muestras de sangre y 200 muestras de cabello), para detectar la presencia de mercurio CO-PNF-78414-GO-CP / Adquisición de 3 Component 3 - Sectoral Prácticas Single Stage - One 2018-11- 2018-10- 2018-11- 2018-12- 2018-12- 2018-12- 2019-01- 2019-01- 2019-01- 2019-03- 2019-04- motocicletas (4 tiempos, TF / A5789 Programs for Sustainable Posterior Open - National 12,857.00 6,458.76 Finalizado comerciales Envelope 15 17 20 11 05 18 15 03 24 08 10 cilindraje 125cc, encendido Landscape Management eléctrico y pedal - CDA. CO-PNF-78379-GO-RFQ / ADQUISICIÓN DE COMPUTADORES PORTATILES, DE MESA, UPS, Component 1 - Protected DISCOS DUROS EXTERNOS Y Solicitud de Single Stage - One 2018-11- 2019-01- 2019-02- 2019-03- 2019-04- TF / 18478 Areas Management and Posterior Open - National 35,000.00 28,504.48 Finalizado UN VIDEO BEAM Y OTROS cotizaciones Envelope 27 12 11 15 12 Financial Sustainability ELEMENTOS (CAMARAS TV) -PNN PARA CHIBIRIQUETE, LA PAYA Y ALTO FRAGUA, ACILAP Y CHURUMBELOS CO-PNF-78388-GO-CP / Component 1 - Protected ADQUISICIÓN DE 2 Prácticas Single Stage - One 2018-11- 2019-03- 2018-11- 2018-12- 2019-03- 2018-12- 2019-04- 2018-12- 2019-04- 2019-02- 2019-07- TF / 18478 Areas Management and Posterior Open - National 7,143.00 5,783.92 Finalizado MOTOCICLETAS PNN ALTO comerciales Envelope 15 13 20 11 29 18 02 26 22 28 02 Financial Sustainability FRAGUA CO-PNF-81083-GO-CP / Component 2 - Forest Prácticas Single Stage - One 2018-11- 2019-02- 2018-11- 2018-12- 2019-03- 2018-12- 2019-03- 2019-01- 2019-03- 2019-03- 2019-06- Stand para la conservación TF / 18478 Governance, Management Posterior Open - National 5,357.00 1,757.46 Finalizado comerciales Envelope 22 20 27 13 05 20 13 03 26 05 13 de las muestras de madera and Monitoring CO-PNF-85470-GO-RFQ / Adquisición de sillas y Component 2 - Forest muebles para las salas de Solicitud de Single Stage - One 2018-11- 2019-01- 2019-04- 2019-03- 2019-06- TF / 18478 Governance, Management Posterior Open - National 18,929.00 15,211.10 Finalizado reuniones, salas de juntas y cotizaciones Envelope 27 22 12 30 17 and Monitoring auditorio en CORPOAMAZONIA. CO-PNF-85487-GO-CP / Component 1 - Protected Prácticas Single Stage - One 2018-11- 2018-11- 2018-11- 2018-12- 2018-11- 2018-12- 2019-01- 2019-01- 2019-03- 2019-02- 2019-03- Adquisición de 1 TF / 18478 Areas Management and Posterior Open - National 2,000.00 2,345.79 Finalizado comerciales Envelope 22 09 27 18 28 25 16 15 07 28 27 motocicletas PNN Serranía Financial Sustainability de Churumbelos CO-PNF-89601-GO-DIR / Component 2 - Forest Adquisición imágenes de Adquisición 2019-01- 2018-11- 2019-02- 2019-02- 2019-02- 2019-03- 2020-01- 2019-08- TF / A5789 Governance, Management Posterior Direct 47,464.00 40,000.24 Finalizado Sensores Remotos: directa 28 19 02 07 15 01 15 31 and Monitoring Procalculo - Prosis. IDEAM - 2019 CO-PNF-99140-GO-CP / Component 2 - Forest Adquisición de un Motor 4 Prácticas Single Stage - One 2019-03- 2019-02- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2019-05- 2019-04- TF / 18478 Governance, Management Posterior Open - National 4,516.00 4,090.64 Finalizado tiempos de 20 H.P. y 3 comerciales Envelope 01 05 06 22 06 29 18 01 26 15 30 and Monitoring Hélices. CO-PNF-109167-GO-CP / Adquisición equipos implementación estrategia de comunicación y difusión Component 1 - Protected (Cámaras fotográficas, Prácticas Single Stage - One 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-07- 2019-07- TF / 18478 Areas Management and Posterior Open - National 17,581.00 17,326.11 Finalizado grabadoras de audio, comerciales Envelope 25 08 30 14 22 21 23 31 28 01 04 Financial Sustainability micrófonos semi profesionales y profesionales, tripode profesional, tarjeta de memoria de 128 GB) CO-PNF-109168-GO-RFQ / Adquisición de Component 1 - Protected motocicletas como apoyo a Solicitud de Single Stage - One 2019-04- 2019-06- 2019-06- 2019-07- 2019-06- TF / 18478 Areas Management and Posterior Open - National 23,226.00 20,084.33 Finalizado las actividades de PVC áreas cotizaciones Envelope 30 17 07 17 21 Financial Sustainability protegidas nacionales, sedes locales y regionales CDA y CAZ CO-PNF-109172-GO-CP / Adquisición de Drones como instrumentos de Component 1 - Protected registro, control y Prácticas Single Stage - One 2019-04- 2019-04- 2019-04- 2019-05- 2019-04- 2019-05- 2019-04- 2019-06- 2019-05- 2019-07- 2019-06- TF / 18478 Areas Management and Posterior Open - National 4,516.00 2,293.05 Finalizado seguimiento de los recursos comerciales Envelope 25 11 30 14 22 21 12 04 15 04 25 Financial Sustainability Naturales de la RFP y áreas protegidas regionales y nacionales del área del Proyecto. CO-PNF-109174-GO-CP / Component 2 - Forest Prácticas Single Stage - One 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-04- 2019-05- 2019-05- 2019-07- 2019-06- Adquisición e instalación TF / 18478 Governance, Management Posterior Open - National 5,806.00 2,711.86 Finalizado comerciales Envelope 25 15 30 14 03 21 15 31 14 01 13 aires acondicionados and Monitoring CO-PNF-109327-GO-RFQ / Botes en Aluminio tipo Arawana como apoyo a las actividades de PVC áreas Component 1 - Protected Solicitud de Single Stage - One 2019-04- 2019-06- 2019-05- 2019-07- 2019-06- protegidas nacionales, TF / 18478 Areas Management and Posterior Open - National 74,839.00 69,488.64 Finalizado cotizaciones Envelope 30 19 29 19 14 sedes locales y regionales Financial Sustainability CDA y CAZ y fortalecimiento resguardos del área del Proyecto CO-PNF-109328-GO-RFQ / Motores fuera de borda Motor Fuera de Borda Pata Corta 40 HP, como apoyo a Component 1 - Protected Solicitud de Single Stage - One 2019-04- 2019-06- 2019-05- 2019-07- 2019-06- las actividades de PVC áreas TF / 18478 Areas Management and Posterior Open - National 49,677.00 46,121.46 Finalizado cotizaciones Envelope 30 17 31 17 14 protegidas nacionales, Financial Sustainability sedes locales y regionales CDA y CAZ, y fortalecimiento resguardos indígenas. CO-PNF-109336-GO-RFQ / Kit materiales y bienes de seguridad alimentaria para fortalecimiento de las familias que hacer parte de Component 3 - Sectoral Solicitud de Single Stage - One 2019-04- 2019-06- 2019-06- 2019-07- 2019-06- la Asociación Campesina TF / 18478 Programs for Sustainable Posterior Open - National 32,258.00 28,751.04 Finalizado cotizaciones Envelope 30 18 10 18 21 ACEFIN y conforman el Landscape Management Ramsar EFI, Jaula para aves, malla, palas, machetes, grapas, limas, semillas de pangoger (tomate, cilant CO-PNF-109338-GO-CP / Adquisición de herramientas diferenciales que permitan el movimiento Component 3 - Sectoral de grandes volúmenes y Prácticas Single Stage - One 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-07- 2019-07- TF / 18478 Programs for Sustainable Posterior Open - National 6,452.00 1,044.96 Finalizado pesos, herramientas de comerciales Envelope 25 01 30 14 23 21 28 31 29 01 04 Landscape Management corte de madera de corte fino y combustible para el funcionamiento de las herramientas. CO-PNF-103496-GO-CP / Component 1 - Protected Adquisición equipos de Solicitud de Single Stage - One 2019-04- 2019-06- 2019-05- 2019-08- 2019-06- TF / 18478 Areas Management and Posterior Open - National 48,397.00 28,304.88 Finalizado cómputo e impresoras y cotizaciones Envelope 22 15 20 14 14 Financial Sustainability licencias CO-PNF-109340-GO-CP / Adquisición equipos para el fortalecimiento de la iniciativa de manejo sostenible y transformación Component 3 - Sectoral Prácticas Single Stage - One 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-07- 2019-07- de la palma de Asai de la TF / 18478 Programs for Sustainable Posterior Open - National 9,677.00 8,046.32 Finalizado comerciales Envelope 25 07 30 14 18 21 29 31 04 01 25 Comunidad Indígena Santa Landscape Management Lucia en Leticia - Amazonas como despulpadoras, licuadores , empacadoras, y demas equipos que se requiere Page 1 CO-PNF-85459-GO-RFQ / Adquisición e instalación de un sistema de video Component 2 - Forest conferencia video-wall, Solicitud de Single Stage - One 2019-05- 2019-07- 2019-05- 2019-09- 2019-07- TF / 18478 Governance, Management Posterior Open - National 41,935.00 38,762.25 Finalizado monitor industrial, cotizaciones Envelope 11 06 28 12 04 and Monitoring monitores led, compatible con sistema Lync de Microsoft en Corpoamazonia CO-PNF-109165-GO-CP / Component 1 - Protected Prácticas Single Stage - One 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-06- Adquisición de GPS y TF / 18478 Areas Management and Posterior Open - National 15,484.00 11,136.25 Finalizado comerciales Envelope 25 25 30 14 08 28 14 07 15 08 13 cámaras trampa Financial Sustainability CO-PNF-109163-GO-RFQ / Adquisición de equipos tecnológicos, licencias y estaciones de trabajo para el fortalecimiento de las Component 1 - Protected Solicitud de Single Stage - One 2019-04- 2019-06- 2019-06- 2019-07- 2019-08- sedes administrativas de TF / 18478 Areas Management and Posterior Open - National 92,065.00 84,691.58 Finalizado cotizaciones Envelope 30 14 04 31 08 PNN, Dto de Putumayo Financial Sustainability Orito, Churumbelos y La paya, Dto Caquetá ,Alto fragua y Serrania Chiribiquete. Adicionalmente regionales CO-PNF-123105-GO-CP / Adquisición e instalación de repuestos para el Component 1 - Protected mantenimiento del bote del Prácticas Single Stage - One 2019-07- 2019-08- 2019-07- 2019-08- 2019-09- 2019-08- 2019-09- 2019-08- 2019-09- 2019-10- 2019-10- TF / A5789 Areas Management and Posterior Open - National 4,839.00 3,287.66 Finalizado PNNSCH, como apoyo a la comerciales Envelope 26 12 31 14 13 21 17 30 26 29 25 Financial Sustainability actividades de PVC del Sector dfe Cartagena del Chairá, Caquetá. CO-PNF-130048-GO-CP / Adquisición de Bote en fibra Component 1 - Protected de vidrio para la Asociación Prácticas Single Stage - One 2019-09- 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-12- 2019-12- TF / A5789 Areas Management and Posterior Open - National 4,354.00 4,024.89 Finalizado de Cabildos Indígenas del comerciales Envelope 20 03 25 09 18 16 23 25 12 23 20 Financial Sustainability pueblo Siona - ACIPS - APV PNN La paya CO-PNF-89870-GO-CP / Adquisición de materiales Component 3 - Sectoral para la construcción de una Prácticas Single Stage - One 2019-01- 2019-01- 2019-01- 2019-02- 2019-02- 2019-05- TF / A5789 Programs for Sustainable Posterior Open - National 8,929.00 0.00 Cancelado balsa flotantes para comerciales Envelope 10 15 29 05 15 16 Landscape Management labores de control y vigilancia en el área del Ramsar. CO-PNF-99144-GO-CP / Component 1 - Protected Adquisición de dos Prácticas Single Stage - One 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-05- TF / 18478 Areas Management and Posterior Open - National 4,516.00 0.00 Cancelado computadores portátiles y comerciales Envelope 01 06 21 28 05 31 Financial Sustainability un computador de escritorio CO-PNF-109339-GO-CP / Adquisición de deshidratador solar para fruta fresca con capacidad Component 3 - Sectoral de 50 kg, para el Prácticas Single Stage - One 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- TF / 18478 Programs for Sustainable Posterior Open - National 19,355.00 0.00 Cancelado fortalecimiento de la comerciales Envelope 25 30 14 21 31 01 Landscape Management iniciativa de manejo sostenible y transformación de la palma de Asai de la Comunidad Indígena Santa Lucia en Leticia - Amazonas. CO-PNF-103501-GO-CP / Compra de teléfonos fijos IP Component 1 - Protected para ser instalados en cada Prácticas Single Stage - One 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- 2019-08- TF / 18478 Areas Management and Posterior Open - National 645.00 0.00 Cancelado una de las oficina de comerciales Envelope 15 20 03 10 24 23 Financial Sustainability coordinaciones de áreas y proyectos CO-PNF-109332-GO-RFQ / Adquisición materiales para fortalecimiendo chagras de los grupos de Component 2 - Forest mujeres de los resguardo Prácticas Single Stage - One 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- TF / 18478 Governance, Management Posterior Open - National 12,903.00 0.00 Cancelado de Medio y Bajo rio comerciales Envelope 25 30 14 21 31 01 and Monitoring Caquetá. (Costales, cuchillos cocina, metros de angeo, valdes aluminio, timbos para almacenar alimentos, guantes, tapabocas, machetes mediano CO-PNF-109344-GO-CP / Elementos de ferreteria Component 1 - Protected Prácticas Single Stage - One 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-09- para mantenimiento TF / 18478 Areas Management and Posterior Open - National 11,290.00 0.00 Cancelado comerciales Envelope 25 30 14 21 31 30 correctivo de la cubierta y Financial Sustainability cielo raso de la sede operativa PNN La Paya CO-PNF-109170-GO-RFQ / Kit de campo y kit de herramientas, áreas Component 1 - Protected Solicitud de Single Stage - One 2019-04- 2019-06- 2019-07- protegidas del SPNN, APR, TF / 18478 Areas Management and Posterior Open - National 24,194.00 0.00 Cancelado cotizaciones Envelope 30 17 17 Sitios Ramsar y zonas Financial Sustainability donde se desarrollará inventario forestal. CO-PNF-109334-GO-CP / Adquisición de bienes para fortalecimiendo chagras de los grupos de mujeres de Component 2 - Forest los resguardo de Medio y Prácticas Single Stage - One 2019-04- 2019-04- 2019-05- 2019-05- 2019-05- 2019-07- TF / 18478 Governance, Management Posterior Open - National 12,903.00 0.00 Cancelado Bajo rio Caquetá (Tina comerciales Envelope 25 30 14 21 31 01 and Monitoring Grande, Platones grandes de dos orejas, Ollas No. 60 y 40, pailas grandes para fariña, molinos) CO-PNF-137074-GO-RFQ / Adquisición de Kits de agricultura Orgánica para fortalecer a las familias que suscribirán los Acuerdos de Component 1 - Protected Solicitud de Single Stage - One 2019-11- 2019-12- 2020-01- 2020-01- 2020-02- Conservación con la CDA en TF / A5789 Areas Management and Posterior Open - National 45,000.00 37,748.53 Finalizado cotizaciones Envelope 04 23 30 22 27 el municipio de San José del Financial Sustainability Guaviare y Kit de campo y herramientas para los facilitadores locales del PNR Miraflores CO-PNF-78419-GO-CP / Dotación Sede Mesa Component 3 - Sectoral Ramsar. Prácticas Single Stage - One 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- TF / A5789 Programs for Sustainable Posterior Open - National 3,786.00 0.00 Cancelado (2 computadoras, 1 comerciales Envelope 25 30 14 21 27 27 Landscape Management teléfono, 2 escritorios, 2 estantes, 30 sillas, 1 tablero, 1 video beam y 1 impresora) CO-PNF-78385-GO-CP / ADQUISICIÓN DE CAMARAS Component 1 - Protected Prácticas Single Stage - One 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- FOTOGRAFICAS Y DOS GPS TF / 18478 Areas Management and Posterior Open - National 3,679.00 0.00 Cancelado comerciales Envelope 09 14 01 08 22 22 PNN- LA PAYA Y ALTO Financial Sustainability FRAGUA CO-PNF-54229-GO-RFQ / Un agrabadora de voz, tipo Component 2 - Forest periodista, digital, mp3 Solicitud de Single Stage - One 2018-05- 2018-06- 2018-06- 2018-10- TF / 18478 Governance, Management Posterior Limited 1,700.00 0.00 Cancelado usb px440 4GB cotizaciones Envelope 01 05 12 30 and Monitoring Dos camaras D5500 kit 18- 55mm CO-PNF-54221-GO-RFQ / Un Motor Peque Peque Component 2 - Forest Solicitud de Single Stage - One 2018-04- 2018-06- 2018-05- 2018-10- 6,5HP cinco chalecos full TF / 18478 Governance, Management Posterior Limited 900.00 0.00 Cancelado cotizaciones Envelope 25 05 29 30 thottle, secado rapido 40 and Monitoring por ciento, para adulto. CO-PNF-78408-GO-RFQ / Adquisición de computadores portátiles, computadores de Escritorio Component 3 - Sectoral Solicitud de Single Stage - One 2018-11- 2019-01- 2019-03- + licencias Ofimáticas y de TF / A5789 Programs for Sustainable Posterior Open - National 28,214.00 0.00 Cancelado cotizaciones Envelope 27 11 14 Antivirus, Impresora Landscape Management Multifuncional con tóner de repuestos, Videobeam, GPS y Table - CORPOAMAZONIA y CDA CO-PNF-78416-GO-CP / Elaboración y entrega de 100 kits (Bolsas ecologicas, calendario ambiental, Component 3 - Sectoral Prácticas Single Stage - One 2019-10- 2019-10- 2019-11- 2019-11- 2019-12- 2020-02- agenda informativa, esfero TF / A5789 Programs for Sustainable Posterior Open - National 7,742.00 0.00 Cancelado comerciales Envelope 21 26 16 23 06 04 ecologico, camibuso tipo Landscape Management polo, gorra y capa) para el evento de suscripción de acuerdos de conservación CO-PNF-123099-GO-CP / Adquisición materiales e Component 3 - Sectoral insumos para la Prácticas Single Stage - One 2019-07- 2019-07- 2019-08- 2019-08- 2019-08- 2019-10- TF / A5789 Programs for Sustainable Posterior Open - National 6,452.00 0.00 Cancelado construcción de las cabañas comerciales Envelope 26 31 14 21 30 29 Landscape Management de control y vigilancia en el sitio Ramsar Estrella Fluvial del Inírida - EFI CO-PNF-54227-GO-RFQ / Elementos de ferreteria: Ocho (8) timbos en plástico resistente con tapa, con Component 2 - Forest capacidad de 20 gls para el Solicitud de Single Stage - One 2018-04- 2018-05- 2018-06- 2018-10- TF / 18478 Governance, Management Posterior Limited 550.00 0.00 Cancelado manejo de gasolina cotizaciones Envelope 29 28 05 30 and Monitoring Cinco (5) carpas para lluvia Un kit de herramientas y un kit de repuestos básicos para motor pq pq CO-PNF-65527-GO-RFQ / Component 2 - Forest Solicitud de Single Stage - One 2018-07- 2018-08- 2018-12- Adquisición de canoa de TF / 18478 Governance, Management Posterior Limited 1,100.00 0.00 Cancelado cotizaciones Envelope 17 30 14 madera. and Monitoring CO-PNF-144829-GO-RFQ / Adquisición de Canoas en Aluminio y Motores FB 40 HP como apoyo a las actividades de PVC en áreas Component 1 - Protected Solicitud de Single Stage - One 2019-12- 2020-01- 2020-02- 2020-02- 2020-08- protegidas, sedes locales, TF / A5789 Areas Management and Posterior Open - National 64,516.00 63,447.84 Finalizado cotizaciones Envelope 04 20 12 20 26 regionales, CDA, CAZ y Financial Sustainability RAMSAR y resguardo de Santa Sofía- Leticia para el fortalecimiento de estrategia de monitoreo de recursos CO-PNF-109313-GO-RFQ / Adquisición equipos fortalecimiento sistema de información ambiental SISA - SIGAE, en la CDA: Component 2 - Forest Solicitud de Single Stage - One 2019-04- 2019-06- 2019-07- SERVIDOR NAS HPE TF / 18478 Governance, Management Posterior Open - National 51,613.00 0.00 Cancelado cotizaciones Envelope 30 27 31 StoreEasy 1860, DISCOS and Monitoring DUROS HPE 2.4TB SAS, SWITCH ADMINISTRABLE, COMPUTADOR TIPO PC TODO EN UNO, LICENCIAS, ACD-GOV 1-24 Device 3 YR Initial S CO-PNF-137116-GO-RFQ / Dotación de equipos de cómputo, almacenamiento y comunicaciones, GPS, y Component 1 - Protected Solicitud de Single Stage - One 2019-12- 2020-01- 2020-01- 2020-02- 2020-04- equipos para difusión y TF / A5789 Areas Management and Posterior Open - National 49,032.00 45,051.32 Finalizado cotizaciones Envelope 04 19 10 18 01 comunicación para el Financial Sustainability desarrollo de las actividades inmersas en los componentes 1, 3 y 4. CO-PNF-109169-GO-CP / Dotación de muebles de oficina y enseres de las sedes de los parques, sedes Component 1 - Protected CDA y CAZ para el Solicitud de Single Stage - One 2019-05- 2019-07- 2020-01- 2019-08- 2020-06- TF / A5789 Areas Management and Posterior Open - National 25,000.00 16,076.69 Finalizado fortalecimiento operativo a cotizaciones Envelope 07 02 31 31 29 Financial Sustainability nivel local y regional: Muebles, escritorios, sillas ergonómicas y sillas auditorio, Mesas, Estantes, archivos, never CO-PNF-137112-GO-CP / Compra generador Component 3 - Sectoral eléctrico para el Prácticas Single Stage - One 2019-11- 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- 2020-02- TF / A5789 Programs for Sustainable Posterior Open - National 3,871.00 0.00 Cancelado fortalecimiento de la comerciales Envelope 29 15 04 17 23 03 02 Landscape Management iniciativa de manejo sostenible del bosque en la comunidad indígena en Leticia CO-PNF-137108-GO-CP / Compra de bienes para el fortalecimiento de la Component 1 - Protected capacidad operativa del Prácticas Single Stage - One 2019-10- 2019-11- 2019-11- 2019-11- 2019-12- 2019-11- 2019-12- 2019-12- 2020-01- 2020-01- 2020-03- TF / A5789 Areas Management and Posterior Open - National 2,065.00 1,886.90 Finalizado PNN la paya: Nevera para comerciales Envelope 30 20 04 18 05 25 10 05 09 03 18 Financial Sustainability refrigeración de elementos perecederos y aire acondicionado, eventos PVC. CO-PNF-123101-GO-CP / Adquisición de una balsa para labores de control y vigilancia, en el sector de Component 3 - Sectoral Loretoyacú que contribuya Prácticas Single Stage - One 2019-07- 2019-07- 2019-08- 2019-08- 2019-08- 2019-11- TF / A5789 Programs for Sustainable Posterior Open - National 9,677.00 0.00 Cancelado al fortalecimiento de la comerciales Envelope 26 31 14 21 30 29 Landscape Management autoridad ambiental en el área Ramsar Tarapoto, entre Corpoamazonia y autoridades indígenas. CO-PNF-147769-GO-CP / Adquisición de Kit de campo, kit de pesca y kit Component 3 - Sectoral de herramientas para el Prácticas Single Stage - One 2019-12- 2020-02- 2020-01- 2020-01- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-03- 2020-06- TF / A5789 Programs for Sustainable Posterior Open - National 12,258.00 4,191.58 Finalizado establecimiento de chagras comerciales Envelope 27 10 01 15 26 22 04 31 10 02 30 Landscape Management y de una maloka pequeña en el terriotrio del resguardo indígena de Mesay CO-PNF-137126-GO-RFQ / Adquisicion de elementos de construccion y ferreteria para mantenimiento Component 1 - Protected correctivo y preventivo, Solicitud de Single Stage - One 2019-11- 2019-12- 2020-02- TF / A5789 Areas Management and Posterior Open - National 32,258.00 0.00 Cancelado adecuacion y/o reparacion cotizaciones Envelope 04 23 21 Financial Sustainability de la sede del Parque la Paya y sus sedes operativas Laguna la paya y Naranjal en el municipio de leguizamon CO-PNF-144826-GO-CP / Dotación de muebles y enseres para las cabañas de Component 3 - Sectoral Prácticas Single Stage - One 2020-01- 2020-01- 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-02- 2020-03- 2020-09- la Estrella Fluvial de Inírida TF / A5789 Programs for Sustainable Posterior Open - National 3,000.00 2,766.63 Finalizado comerciales Envelope 13 08 18 01 22 08 31 17 10 19 23 para el fortalecimiento de Landscape Management capacidad operativa sitio Ramsar CO-PNF-144828-GO-CP / Kit de campo para la Component 3 - Sectoral dotación de cabañas de la Prácticas Single Stage - One 2020-01- 2020-01- 2020-01- 2020-02- 2020-01- 2020-02- 2020-02- 2020-02- 2020-02- 2020-03- 2020-04- TF / A5789 Programs for Sustainable Posterior Open - National 6,000.00 3,258.51 Finalizado Estrella fluvial de Inírida comerciales Envelope 13 15 18 01 29 08 14 17 27 19 18 Landscape Management para el fortalecimiento de capacidad operativa sitio Ramsar Page 2 CO-PNF-130046-GO-RFQ / Adquisición de elementos de construcción y ferretería, para el mantenimiento Component 1 - Protected Solicitud de Single Stage - One 2020-01- 2020-03- 2020-02- 2020-04- 2020-04- preventivo/correctivo y TF / A5789 Areas Management and Posterior Open - National 19,355.00 17,571.67 Finalizado cotizaciones Envelope 18 08 21 06 01 adecuación del auditorio de Financial Sustainability la Sede Administrativa ubicada en el Municipio de Leguízamo - la paya CO-PNF-150333-GO-CP / Adquisición de cámaras de Component 1 - Protected Prácticas Single Stage - One 2019-12- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-01- 2020-02- 2020-01- 2020-03- 2020-02- seguridad para el PNN S TF / A5789 Areas Management and Posterior Open - National 1,129.00 522.86 Finalizado comerciales Envelope 30 10 04 18 23 25 28 01 31 02 27 Chiribiquete, sedes San José Financial Sustainability del Guaviare y Calamar CO-PNF-156567-GO-CP / Dotación de muebles de oficina y enseres para la Component 1 - Protected Prácticas Single Stage - One 2020-03- 2020-02- 2020-04- 2020-04- 2020-02- 2020-04- 2020-03- 2020-05- 2020-03- 2020-06- 2020-06- sede del Parque Nacional TF / A5789 Areas Management and Posterior Open - National 4,194.00 3,083.66 Finalizado comerciales Envelope 30 05 04 18 20 25 09 05 16 04 19 Natural Serranía de Financial Sustainability Chiribiquete en Florencia, Caquetá, para su funcionamiento operativo. CO-PNF-130043-GO-CP / Adquisición de elementos de seguridad y operación para Botes ( Botiquín Básico Component 2 - Forest Prácticas Single Stage - One 2019-09- 2020-06- 2019-09- 2019-10- 2020-07- 2019-10- 2020-08- 2019-10- 2020-09- 2019-12- 2020-11- para embarcación, Remo TF / A5789 Governance, Management Posterior Open - National 9,677.00 3,972.44 Finalizado comerciales Envelope 20 18 25 09 07 16 19 28 04 27 06 adaptable al tamaño del and Monitoring bote, Caja básica de herramientas (para motor fuera de borda), Extintor para embarcaciones. CO-PNF-150329-GO-RFQ / Adquisición de Kits de agricultura orgánica para el Component 3 - Sectoral Solicitud de Single Stage - One 2020-07- 2020-08- 2020-08- 2020-09- 2020-09- fortalecimiento de las TF / A5789 Programs for Sustainable Posterior Open - National 59,355.00 24,283.91 Finalizado cotizaciones Envelope 05 15 27 14 27 familias que hacer parte de Landscape Management la Asociación Campesina ACEFIN y viven en el Sitio Ramsar EFI CO-PNF-178649-GO-RFQ / Adquisición de material vegetal para establecimiento de arreglos Component 3 - Sectoral agroforestales y protocolos Solicitud de Single Stage - One 2020-09- 2020-10- 2020-08- 2021-05- 2020-10- TF / A5789 Programs for Sustainable Posterior Open - National 25,065.00 14,148.47 Finalizado de restauración en el marco cotizaciones Envelope 05 23 14 21 23 Landscape Management de acuerdos de conservación, restauración y no deforestación, en el departamento del Guaviare- CDA CO-PNF-178654-GO-CP / Adquisición de Motocicleta, Kits equipos e implementos Component 3 - Sectoral para desarrollar el trabajo Prácticas Single Stage - One 2020-08- 2020-10- 2020-09- 2020-09- 2020-11- 2020-09- 2020-12- 2020-10- 2020-12- 2020-12- 2021-03- TF / A5789 Programs for Sustainable Posterior Open - National 16,129.00 18,263.97 Finalizado de campo para la comerciales Envelope 31 26 05 19 23 26 15 06 23 05 03 Landscape Management implementación de los Acuerdos de Conservación, Restauración y No Deforestación CO-PNF-178652-GO-RFB / Adquisición de elementos para alinderamiento y refuerzo perimetral requerido para Component 3 - Sectoral Solicitud de Single Stage - One En 2020-08- 2020-11- 2020-09- 2020-10- 2020-12- 2020-10- 2020-11- 2021-02- establecimiento de arreglos TF / A5789 Programs for Sustainable Posterior Open - National 261,065.00 0.00 ofertas Envelope ejecución 31 19 05 05 18 15 12 10 agroforestales y protocolos Landscape Management de restauración en el marco de acuerdos de conservación, restauración y no deforestación, en el departamento del Guav CO-PNF-178648-GO-RFQ / Adquisición de materiales, herramientas e insumos para la adecuación del vivero forestal comunitario Component 3 - Sectoral Solicitud de Single Stage - One 2020-09- 2020-10- 2020-10- 2020-12- 2020-12- en la inspección de TF / A5789 Programs for Sustainable Posterior Open - National 28,358.00 21,390.20 Finalizado cotizaciones Envelope 05 23 02 22 21 Remolinos del Caguán para Landscape Management la producción del material vegetal para el establecimiento de los sistemas productivos sostenibles CO-PNF-194080-GO-CP / Adquirir material vegetal para implementación de los acuerdos de conservación, restauración y no Component 3 - Sectoral Prácticas Single Stage - One 2020-12- 2020-10- 2021-01- 2021-01- 2020-10- 2021-02- 2020-11- 2021-02- 2020-11- 2021-03- 2021-02- deforestación, mediante TF / A5789 Programs for Sustainable Posterior Open - National 5,821.00 5,818.35 Finalizado comerciales Envelope 30 05 04 25 20 01 13 22 24 24 23 sistemas productivos Landscape Management orientados a restauración en el núcleo 2 de Cartagena del Chairá, departamento del Caquetá CO-PNF-194053-GO-RFQ / Adquisición de elementos para salvaguardar el Component 3 - Sectoral bienestar de las Solicitud de Single Stage - One 2021-01- 2021-02- 2020-11- 2021-03- 2020-12- TF / A5789 Programs for Sustainable Posterior Open - National 26,866.00 24,716.69 Finalizado comunidades beneficiarias cotizaciones Envelope 04 18 25 20 21 Landscape Management del Proyecto GEF CA, que a su vez aportan al fortalecimiento de la soberanía alimentaria indígena CO-PNF-178647-GO-RFB / Adquisición de Kits de campo para el personal que apoyará la implementación de los Acuerdos de Component 3 - Sectoral Solicitud de Single Stage - One 2020-12- 2020-12- 2021-01- 2021-02- 2021-01- 2021-02- 2021-03- 2021-05- Conservación, Restauración TF / A5789 Programs for Sustainable Posterior Open - National 543,165.00 0.00 Cancelado ofertas Envelope 30 21 04 03 25 13 13 12 y No Deforestación, y Kits Landscape Management de agricultura Orgánica, Kits de insumos agrícolas para sistemas productivos sostenibles, y Kits de cerca CO-PNF-200271-GO-CP / Adquisición de bienes para el fortalecimiento de la capacidad operativa, la gobernabilidad, en el marco Component 3 - Sectoral de estrategias Prácticas Single Stage - One 2020-12- 2020-10- 2021-01- 2021-01- 2021-01- 2021-01- 2021-01- 2021-02- 2021-02- 2021-03- 2021-03- TF / A5789 Programs for Sustainable Posterior Open - National 7,284.00 4,813.71 Finalizado complementarias de comerciales Envelope 30 29 04 18 29 25 15 01 16 03 24 Landscape Management conservación, para el desarrollo propio de la comunidad interétnica del resguardo indígena Llanos del Yarí – Yaguara CO-PNF-200251-GO-RFQ / Adquisición de insumos y materiales necesarios para la producción de material vegetal de especies Component 3 - Sectoral Solicitud de Single Stage - One 2021-01- 2021-02- 2021-03- forestales protectoras, TF / A5789 Programs for Sustainable Posterior Open - National 12,057.00 0.00 Cancelado cotizaciones Envelope 04 18 20 necesarias para el Landscape Management establecimiento e implementación de los Acuerdos de Conservación, Restauración y No Deforestación CO-PNF-200250-GO-CP / Adquisición equipos tecnológicos (Cámara, GPS, video beam, computador, impresora y disco duro) Component 1 - Protected Prácticas Single Stage - One 2020-12- 2020-10- 2021-01- 2021-01- 2020-11- 2021-01- 2020-12- 2021-02- 2020-12- 2021-02- 2021-01- para el fortalecimiento de la TF / A5789 Areas Management and Posterior Open - National 8,133.00 6,304.28 Finalizado comerciales Envelope 30 30 04 18 18 25 07 04 17 05 28 capacidad operativa de la Financial Sustainability Asociación APKAC, Resguardos Indígenas Cecilia Cocha, Perecera y Paya Indígena. CO-PNF-204769-GO-CP / Adquisición de insumos y materiales necesarios para la producción de material vegetal de especies Component 3 - Sectoral Prácticas Single Stage - One 2020-12- 2020-12- 2021-01- 2021-01- 2020-12- 2021-01- 2021-01- 2021-02- 2021-02- 2021-03- 2021-03- forestales protectoras, TF / A5789 Programs for Sustainable Posterior Open - National 12,018.00 10,403.25 Finalizado comerciales Envelope 30 03 04 18 23 28 22 07 03 09 12 necesarias para el Landscape Management establecimiento e implementación de los Acuerdos de Conservación, Restauración y No Deforestación CO-PNF-178645-GO-RFQ / Adquisición material vegetal para el establecimiento de sistemas productivos sostenibles Component 3 - Sectoral Solicitud de Single Stage - One 2021-01- 2021-02- 2021-04- para la implementación de TF / A5789 Programs for Sustainable Posterior Open - National 22,277.00 0.00 Cancelado cotizaciones Envelope 04 21 22 los acuerdos de Landscape Management conservación, restauración y no deforestación, en el departamento de Caquetá - CORPOAMAZONIA CO-PNF-223622-GO-CP / Adquirir papelería y útiles de oficina, para facilitar la labor del equipo técnico en Component 3 - Sectoral campo en función de las Prácticas Single Stage - One En 2021-06- 2021-03- 2021-07- 2021-07- 2021-06- 2021-07- 2021-08- 2021-09- TF / A5789 Programs for Sustainable Posterior Open - National 5,422.00 0.00 actividades programadas comerciales Envelope ejecución 30 26 05 19 03 26 05 04 Landscape Management con los beneficiarios que suscribieron acuerdos de conservación, restauración y no deforestación. CO-PNF-223143-GO-CP / Adquisición de equipos de equipos computo, memorias extraíbles, Discos Component 4 - Project duros solidos, eleva Coordination, Prácticas Single Stage - One 2021-06- 2021-03- 2021-07- 2021-07- 2021-04- 2021-07- 2021-05- 2021-08- 2021-05- 2021-09- TF / A5789 Posterior Open - National 4,593.00 4,153.10 Firmado pantallas, descansa pies y Management, Monitoring comerciales Envelope 30 26 05 19 21 26 04 05 19 04 kits de mouse y teclado and Evaluation (M&E) para el fortalecimiento institucional y aumento en la capacidad operativa del proyecto. CO-PNF-182725-GO-CP / Adquisición de insumos y herramientas para la producción de material vegetal requerido en el Component 3 - Sectoral establecimiento de arreglos Solicitud de Single Stage - One Ejecución 2021-07- 2021-09- 2021-10- TF / A5789 Programs for Sustainable Posterior Open - National 14,925.00 0.00 agroforestales y protocolos cotizaciones Envelope pendiente 14 07 07 Landscape Management de restauración en el marco de acuerdos de conservación, restauración y no deforestación, en el departamen CO-PNF-234244-GO-RFQ / Adquirir semillas sexuales pregerminadas de especies agroforestales maderables y Component 3 - Sectoral frutales amazónicos para la Solicitud de Single Stage - One En 2021-07- 2021-09- 2021-10- TF / A5789 Programs for Sustainable Posterior Open - National 6,031.00 0.00 implementación sistemas cotizaciones Envelope ejecución 05 02 02 Landscape Management contemplados en las Herramientas de Manejo del Paisaje HMP, orientados a la restauración ecológica. CO-PNF-239248-GO-RFB / Adquirir materiales, insumos y accesorios para el aislamiento eléctrico de Component 3 - Sectoral áreas con paneles solares, Solicitud de Single Stage - One Ejecución 2021-09- 2021-10- 2021-11- 2021-11- 2021-12- 2022-02- TF / A5789 Programs for Sustainable Posterior Open - National 293,411.00 0.00 estantillos de madera ofertas Envelope pendiente 30 05 04 14 12 10 Landscape Management plástica e insumos agrícolas, con el fin de apoyar la implementación de conservación, restauración y no deforestación. NON CONSULTING SERVICES Activity Reference No. Estimated Draft Pre- Draft Bidding Specific Bid Evaluation Loan / Credit Market Procurement Prequalificatio Actual Process Prequalification Bidding Documents Proposal Submission / Description Component Review Type Method Amount qualification Document / Procurement Notice Report and Signed Contract Contract Completion No. Approach Process n (Y/N) Amount (US$) Status Evaluation Report as Issued / Opening / Minutes (US$) Documents Justification / Invitation Recommendation Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned for Award Actual Planned Actual Planned Actual CO-PNF-34495-NC-RFQ / Acopio de material audiovisual y reproducción de los vídeos generados Component 3 - Sectoral como material de Solicitud de Single Stage - One 2017-11- 2017-11- 2018-02- 2017-12- 2018-03- TF / 18478 Programs for Sustainable Posterior Limited 3,703.00 3,486.90 Finalizado capacitación de los talleres cotizaciones Envelope 06 29 28 20 16 Landscape Management de la propuesta de la Gobernación del Guaviare - Frenar frontera agrícola (Unidades Ambientales para la Paz y la Prestación de servicio) CO-PNF-41744-NC-RFQ / Perfilar, tallar y preparar las Component 2 - Forest muestras de madera Solicitud de Single Stage - One 2018-01- 2018-02- 2018-08- TF / 18478 Governance, Management Posterior Limited 8,571.00 0.00 Cancelado provenientes del Amazonas cotizaciones Envelope 03 28 27 and Monitoring para el desarrollo de las colecciones de madera. CO-PNF-41765-NC-RFQ / Prestación de servicios de Component 3 - Sectoral Solicitud de Single Stage - One 2018-01- 2018-02- 2018-08- medios audiovisuales para TF / 18478 Programs for Sustainable Posterior Limited 3,571.00 0.00 Cancelado cotizaciones Envelope 03 28 27 generación de mensajes a Landscape Management distintos sectores CO-PNF-75477-NC-CP / Diagramación e impresión Component 2 - Forest de 500 cuadernillos Prácticas Single Stage - One 2018-09- 2019-02- 2018-09- 2019-03- 2018-10- 2019-03- 2018-10- 2019-03- 2018-11- 2019-04- 2018-12- 2019-07- TF / 18478 Governance, Management Posterior Limited 3,570.00 1,959.26 Finalizado explicativos del comerciales Envelope 20 15 25 12 10 12 17 22 01 04 31 08 and Monitoring conocimiento local de las maderas que acompaña las diferentes colecciones CO-PNF-103502-NC-RFQ / Adquisición de los servicios de digitalización de mas de 2.400.000 folios Component 1 - Protected Solicitud de Single Stage - One 2019-03- 2019-05- 2019-05- 2019-11- 2019-09- almacenados en GRM y en TF / 18478 Areas Management and Posterior Open - National 41,935.00 32,014.28 Finalizado cotizaciones Envelope 18 01 16 29 19 el archivo físico de la Financial Sustainability entidad, y cargue de la información a la nube y/o lugar de repositorio que disponga la entidad. CO-PNF-109175-NC-CP / ADECUACIÓN CENTRO DE DATOS EN LA SEDE CENTRAL DE LA CDA EN PUERTO INIRIDA, 50 Component 2 - Forest PUNTOS DE RED DE DATOS Prácticas Single Stage - One 2019-04- 2019-04- 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-05- 2019-05- 2019-07- 2019-06- TF / 18478 Governance, Management Posterior Open - National 14,839.00 12,229.16 Finalizado CATEGORÍA 6 Y ENERGÍA comerciales Envelope 25 11 30 14 23 21 03 31 10 01 14 and Monitoring REGULADA (INSTALADOS EN LA SEDE CENTRAL DE LA CDA EN PUERTO INIRIDA y SISTEMA DE AIRE ACONDICIONADO 24.000 BTU Page 3 CO-PNF-109317-NC-RFQ / Análisis de maderas para definir la trazabilidad del Component 3 - Sectoral Solicitud de Single Stage - One 2019-04- 2019-06- 2019-06- 2019-07- 2019-07- productos promisorios en el TF / 18478 Programs for Sustainable Posterior Open - National 29,032.00 26,832.74 Finalizado cotizaciones Envelope 30 28 10 31 08 sector de Capricho, en el Landscape Management marco del Programa de Foresteria Comunitaria. CO-PNF-130044-NC-CP / Fortalecimiento institucional mantenimiento y adecuación a todo costo Component 2 - Forest de puntos de red de datos Prácticas Single Stage - One 2019-09- 2019-10- 2019-09- 2019-10- 2019-11- 2019-10- 2019-11- 2019-10- 2019-11- 2020-01- 2020-05- TF / A5789 Governance, Management Posterior Open - National 6,452.00 4,931.20 Finalizado categoría 6 y energía comerciales Envelope 20 21 25 09 12 16 18 25 29 24 19 and Monitoring regulada para las oficinas de la Subdirección de administración ambiental de CORPOAMAZONIA."- sede Mocoa CO-PNF-89883-NC-CP / Construcción de una balsa flotante para labores de control y vigilancia en la entrada a Caño Bocón, que Component 3 - Sectoral Prácticas Single Stage - One 2019-01- 2019-01- 2019-02- 2019-02- 2019-03- 2019-06- permita el fortalecimiento TF / A5789 Programs for Sustainable Posterior Open - National 8,929.00 0.00 Cancelado comerciales Envelope 10 24 07 19 01 03 de la autoridad ambiental Landscape Management en el área del Ramsar, entre CDA y acuerdo con las autoridades indígenas de ejercer este control. CO-PNF-89855-NC-RFQ / Component 3 - Sectoral Contratación Transporte Solicitud de Single Stage - One 2019-01- 2019-02- 2020-02- TF / A5789 Programs for Sustainable Posterior Limited 18,571.00 0.00 Cancelado Fluvial desplazamiento cotizaciones Envelope 15 20 19 Landscape Management comunidad EFI. CO-PNF-137118-NC-CP / Component 1 - Protected Elaboración de mojones Prácticas Single Stage - One 2019-10- 2019-11- 2019-10- 2019-11- 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-12- 2020-02- TF / A5789 Areas Management and Posterior Open - National 3,226.00 2,888.19 Finalizado para materializar el límite comerciales Envelope 21 15 26 08 28 15 29 25 11 25 26 Financial Sustainability de la RFP Serranía La Lindosa CO-PNF-109346-NC-RFQ / Elaboración e impresión Component 1 - Protected Solicitud de Single Stage - One 2019-11- 2019-12- 2020-07- 2020-04- 2021-03- de piezas comunicativas, TF / A5789 Areas Management and Posterior Open - National 38,710.00 10,943.09 Finalizado cotizaciones Envelope 04 22 28 19 12 material y actividades de Financial Sustainability divulgación CO-PNF-78417-NC-CP / Elaborar, suministrar, transportar e instalar vallas informativas y de Component 1 - Protected Solicitud de Single Stage - One 2019-12- 2020-01- 2020-01- 2020-04- 2020-08- divulgación en el marco de TF / A5789 Areas Management and Posterior Open - National 26,452.00 18,515.81 Finalizado cotizaciones Envelope 04 22 15 21 25 los componentes de gestión Financial Sustainability del Proyecto GEF CA, en el departamento de Guaviare, a cargo de la Corporación CDA. CO-PNF-78410-NC-CP / Contratación de actividades de divulgación y comunicación de los Component 3 - Sectoral avances y resultados Prácticas Single Stage - One 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2019-03- TF / A5789 Programs for Sustainable Posterior Limited 7,143.00 0.00 Cancelado (Programas radiales x 15 comerciales Envelope 18 23 08 15 27 29 Landscape Management minutos semanales - 8 capsulas informáticas - elaboración y emisión de 8 cuñas radiales - CORPOAMAZONIA CO-PNF-71703-NC-RFQ / Adquisición e instalación de la Red Electrica para la Sede Component 1 - Protected San Jose del Guaviare Solicitud de Single Stage - One 2018-04- 2018-08- 2018-11- TF / 18478 Areas Management and Posterior Limited 16,667.00 0.00 Cancelado (centros de transformación cotizaciones Envelope 29 21 22 Financial Sustainability de energía eléctrica, tipo poste sobre un apoyo de hormigón de 750 kgf de carga de rotura. CO-PNF-17815-NC-RFB / Adquisición e instalación de la Red Electrica para la Sede San Jose del Guaviare (centros de transformación Component 1 - Protected Solicitud de Single Stage - One 2017-08- 2017-09- 2017-11- de energía eléctrica, tipo TF / 18478 Areas Management and Posterior Limited 16,667.00 0.00 Cancelado cotizaciones Envelope 22 20 20 poste sobre Financial Sustainability un apoyo de hormigón de 750 kgf de carga de rotura y transformador de potencia de 15 , tensiones de 13.2 k) CO-PNF-81067-NC-CP / Diagramación e impresión Component 2 - Forest Prácticas Single Stage - One 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2019-01- de cartillas sobre TF / 18478 Governance, Management Posterior Open - National 17,857.00 0.00 Cancelado comerciales Envelope 26 31 15 22 06 08 recuperación de semillas de and Monitoring las chagras en Mirití CO-PNF-78420-NC-CP / Diseño, impresión de vallas, Component 3 - Sectoral Prácticas Single Stage - One 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- folletos en las 5 áreas TF / A5789 Programs for Sustainable Posterior Open - National 7,286.00 0.00 Cancelado comerciales Envelope 22 27 12 19 29 25 priorizadas por CDA y Mesa Landscape Management Ramsar. CO-PNF-144843-NC-RFQ / Desarrollo de actividades de divulgación y comunicación de los avances y resultados en la Component 1 - Protected Solicitud de Single Stage - One 2019-12- 2020-01- 2020-10- 2020-07- 2021-01- suscripción e TF / A5789 Areas Management and Posterior Open - National 27,097.00 14,204.90 Firmado cotizaciones Envelope 04 23 01 23 28 implementación de los Financial Sustainability acuerdos de conservación, restauración y no deforestación CDA y CORPOAMAZONIA ( Programas radiales) CO-PNF-137114-NC-CP / Sobrevuelos en áreas protegidas del piedemonte amazónico y Parque Component 1 - Protected Chiribiquete para apoyar Prácticas Single Stage - One 2019-11- 2019-11- 2019-12- 2019-12- 2019-11- 2019-12- 2019-12- 2020-01- 2019-12- 2020-07- 2020-01- TF / A5789 Areas Management and Posterior Open - National 8,871.00 4,988.39 Finalizado ejercicios de prevención, comerciales Envelope 29 15 04 18 28 25 03 04 18 06 27 Financial Sustainability vigilancia y control y monitoreo de presiones asociadas con actividades antrópicas CO-PNF-109349-NC-CP / Trasmisión de cuñas en Component 3 - Sectoral Prácticas Single Stage - One 2019-11- 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-04- 2020-05- programas radiales en el TF / A5789 Programs for Sustainable Posterior Open - National 3,226.00 3,030.10 Finalizado comerciales Envelope 29 22 04 18 09 25 20 04 07 03 29 marco de las actividades del Landscape Management Proyecto. CO-PNF-78415-NC-CP / Desarrollo de actividades de divulgación y comunicación de los avances y resultados en la suscripción e Component 3 - Sectoral Prácticas Single Stage - One 2019-10- 2019-10- 2019-11- 2019-11- 2019-11- 2020-03- implementación de los TF / A5789 Programs for Sustainable Posterior Limited 10,000.00 0.00 Cancelado comerciales Envelope 21 26 10 17 28 29 acuerdos de conservación, Landscape Management restauración y no deforestación CDA y CORPOAMAZONIA ( Programas radiales) CO-PNF-99133-NC-CP / Impresión del Plan de manejo del Ramsar EFI y Component 3 - Sectoral Prácticas Single Stage - One 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-07- divulgación a las TF / A5789 Programs for Sustainable Posterior Open - National 13,226.00 0.00 Cancelado comerciales Envelope 01 06 22 29 05 04 comunidades locales de la Landscape Management EFI y entidades gubernamentales y ONG vinculadas. CO-PNF-145680-NC-CP / Adquisición de un Kit de campo, un kit de pesca y un Component 3 - Sectoral kit de herramientas para el Prácticas Single Stage - One 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- 2020-02- TF / A5789 Programs for Sustainable Posterior Open - National 12,258.00 0.00 Cancelado establecimiento de chagras comerciales Envelope 29 04 18 25 03 02 Landscape Management y de una maloka pequeña en el terriotrio del resguardo indígena de Mesay CO-PNF-159310-NC-RFQ Component 4 - Project / Evento misión de Coordination, Solicitud de Single Stage - One 2020-02- 2020-03- 2020-03- TF / B1287 Posterior Open - National 20,968.00 0.00 Cancelado preparación y evaluación de Management, Monitoring cotizaciones Envelope 19 16 17 medio término GEF 7 and Evaluation (M&E) CO-PNF-145248-NC-CP / Adecuación balsa del Resguardo Ticoya con la que se apoyará las labores de monitoreo, contro y Component 3 - Sectoral Prácticas Single Stage - One 2020-03- 2020-08- 2020-04- 2020-04- 2020-09- 2020-04- 2020-09- 2020-05- 2020-10- 2020-07- 2020-11- vigilancia, que  contribuya TF / A5789 Programs for Sustainable Posterior Open - National 4,194.00 2,861.43 Finalizado comerciales Envelope 30 20 04 18 02 25 10 07 01 06 30 al fortalecimiento de la Landscape Management autoridad ambiental en el área Ramsar Tarapoto, entre Corpoamazonia y autoridades indígenas. CO-PNF-144824-NC-RFQ / Análisis de laboratorio Fase 2 para definir la Component 3 - Sectoral trabajabilidad de otras Solicitud de Single Stage - One 2020-04- 2020-05- 2020-07- TF / A5789 Programs for Sustainable Posterior Open - National 58,065.00 0.00 Cancelado especies maderables en el cotizaciones Envelope 04 25 24 Landscape Management sector de Capricho, en el marco del Programa de Forestería Comunitaria ASOCAPRICHO CO-PNF-89853-NC-CDD / Talleres y reuniones planeación, seguimiento y desarrollo del plan de Component 3 - Sectoral Solicitud de Single Stage - One 2019-02- 2019-04- 2019-12- trabajo y construcción del TF / A5789 Programs for Sustainable Posterior Limited 14,643.00 0.00 Cancelado cotizaciones Envelope 20 17 31 REM, en el marco de los Landscape Management acuerdos de consulta con el Resguardo Itilla, para la segunda ampliación del PNN SCH. CO-PNF-89852-NC-CDD / Talleres institucionales y con ATICOYA, para socialización PM y Component 3 - Sectoral concertación acciones plan Solicitud de Single Stage - One 2019-02- 2019-04- 2019-12- TF / A5789 Programs for Sustainable Posterior Limited 19,996.00 0.00 Cancelado de trabajo, gastos de viaje y cotizaciones Envelope 20 17 31 Landscape Management desplazamiento Planeación y Seguimiento, proceso de socialización, ajuste e implementación del Plan de Manejo - Tarapoto. CO-PNF-89851-NC-CDD / Talleres, reuniones, asambleas de resguardos y recorridos, desarrollo Component 2 - Forest Solicitud de Single Stage - One 2019-02- 2019-04- 2019-12- planes de trabajo que se TF / 18478 Governance, Management Posterior Limited 37,143.00 0.00 Cancelado cotizaciones Envelope 20 17 31 convinieron en el marco de and Monitoring la consulta previa de la primera ampliación del PNN SCH con los resguardos del medio río Caquetá. CO-PNF-89850-NC-CDD / Talleres y reuniones Component 1 - Protected consulta previa Solicitud de Single Stage - One 2019-02- 2019-04- 2019-12- TF / A5789 Areas Management and Posterior Limited 53,571.00 0.00 Cancelado comunidades indígenas cotizaciones Envelope 20 17 31 Financial Sustainability vecinas del Area Protegida Regional del bajo Caguan - CORPOAMAZONIA. CO-PNF-89798-NC-CDD / Talleres, reuniones, comités Component 1 - Protected técnicos, operativos y Solicitud de Single Stage - One 2019-02- 2019-04- 2019-12- TF / A5789 Areas Management and Posterior Limited 62,066.00 0.00 Cancelado coordinación, recorridos cotizaciones Envelope 20 17 31 Financial Sustainability cumplimiento acuerdos de uso y manejo con PNN Paya. CO-PNF-161561-NC-RFQ / Realización de estudios anatómicos, propiedades físico mecánicas, Component 3 - Sectoral trabajabilidad y Solicitud de Single Stage - One 2020-09- 2020-10- 2020-11- 2021-06- TF / A5789 Programs for Sustainable Posterior Open - National 53,731.00 52,592.57 Firmado potencialidad de uso, de las cotizaciones Envelope 02 20 23 17 Landscape Management maderas de seis especies forestales establecidas o de vegetación natural del departamento del Guaviare CO-PNF-184051-NC-CP / Adecuación y mantenimiento a la embarcación ubicada en el Component 2 - Forest Prácticas Single Stage - One 2021-06- 2021-07- 2021-07- 2021-07- 2021-08- 2021-10- municipio de Cartagena del TF / A5789 Governance, Management Posterior Open - National 2,985.00 0.00 Cancelado comerciales Envelope 30 05 20 27 03 02 Chairá de propiedad de and Monitoring Corpoamazonia en el marco del proyecto “Conservación de Bosques y Sostenibilidad en el Corazón de la Amazonia” CO-PNF-144823-NC-CP / Impresión de cartillas sobre el Programa intercambio de conocimiento sobre Manejo Component 3 - Sectoral Prácticas Single Stage - One 2021-01- 2021-01- 2021-02- 2021-02- 2021-02- 2021-03- Forestal Sostenible - TF / A5789 Programs for Sustainable Posterior Open - National 3,226.00 0.00 Cancelado comerciales Envelope 13 18 01 08 17 20 Propiedades técnicas de Landscape Management algunas especies maderables y no maderables de la Amazonia colombiana. CO-PNF-167968-NC-CP / Eventos de socialización GEF7, misiones de Component 4 - Project negociación y cierre de la Coordination, Solicitud de Single Stage - One Ejecución 2021-07- 2021-09- 2021-10- etapa de formulación del TF / B1287 Posterior Open - National 20,000.00 0.00 Management, Monitoring cotizaciones Envelope pendiente 05 09 09 GEF7. (Alquiler salón de and Evaluation (M&E) reunión, alojamiento, gastos de desplazamiento y alimentación) CONSULTING FIRMS Activity Reference No. Actual Short List and Draft Opening of Combined Loan / Credit Market Contract Type Estimated Process Expression of Request for Evaluation of / Description Component Review Type Method Amount Terms of Reference Request for Technical Proposals Evaluation Report Signed Contract Contract Completion No. Approach Amount (US$) Status Interest Notice Proposals as Issued Technical Proposal (US$) Proposals / Minutes and Draft Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Negotiated Contract Actual Planned Actual Planned Actual CO-PNF-17962-CS-LCS / Component 4 - Project Consultoria que adelante la Selección Coordination, 2017-08- 2017-05- 2017-08- 2017-08- 2017-09- 2017-09- 2017-09- 2017-09- 2017-09- 2017-09- 2017-09- 2017-09- 2017-10- 2017-11- 2017-12- Auditoría Externa al TF / 18478 Posterior basada en el Open - National 16,667.00 8,938.80 Finalizado Management, Monitoring 01 31 01 15 25 14 18 15 27 20 27 30 02 29 02 Proyecto Corazón de la menor costo and Evaluation (M&E) Amazonia - 2017 CO-PNF-17980-CS-QCBS / Component 1 - Protected Selección Consultoría para analisis 2017-02- 2017-03- 2017-03- 2017-04- 2017-05- 2017-05- 2017-06- 2018-02- TF / 18478 Areas Management and Posterior basada en Open - National 111,111.00 0.00 Cancelado económico financiero del 15 01 31 30 07 19 10 05 Financial Sustainability calidad y costo PNN Chiribiquete FPN C1 CO-PNF-20949-CS-QCBS / Consultoría para la Identificación de áreas Component 3 - Sectoral Selección susceptibles para la 2017-08- 2017-09- 2017-09- 2017-10- 2017-10- 2017-11- 2017-11- 2018-03- TF / 18478 Programs for Sustainable Posterior basada en Open - National 111,111.00 0.00 Cancelado implementación de 30 13 23 23 30 10 21 21 Landscape Management calidad y costo compensaciones por pérdida de la biodiversidad en la jurisdicción de CDA. Page 4 Component 4 - Project CO-PNF-41773-CS-LCS / Selección Coordination, 2018-02- 2018-03- 2018-04- 2018-05- 2018-06- 2018-07- 2018-09- 2018-11- Auditoría externa al TF / 18478 Posterior basada en el Open - National 15,714.00 0.00 Cancelado Management, Monitoring 20 13 26 24 23 28 01 30 proyecto año 2018 menor costo and Evaluation (M&E) CO-PNF-17957-CS-LCS / Consultoría para la elaboración de una Guía Component 3 - Sectoral Selección 2017-09- 2017-09- 2017-09- 2017-10- 2017-11- 2017-11- 2017-12- 2018-05- para el manejo ambiental TF / 18478 Programs for Sustainable Posterior basada en el Open - National 92,593.00 0.00 Cancelado 01 15 29 30 07 17 01 30 para la construcción, Landscape Management menor costo mantenimiento, rehabilitación y mejoramiento de vías de tercer orden. CO-PNF-17956-CS-QCBS / Evaluación ambiental Component 3 - Sectoral Selección estratégica de iniciativas 2017-08- 2017-09- 2017-09- 2017-11- 2017-11- 2017-11- 2017-12- 2018-08- TF / 18478 Programs for Sustainable Posterior basada en Open - National 103,704.00 0.00 Cancelado sectoriales (nacional y 15 14 25 09 14 20 04 01 Landscape Management calidad y costo territorial) en municipios arco de deforestación. CO-PNF-54338-CS-CQS / CONSULTORÍA PARA Selección LLEVAR A CABO LA Component 3 - Sectoral basada en 2018-04- 2018-04- 2018-05- 2018-06- 2018-05- 2018-07- 2018-10- 2018-09- 2018-10- 2019-06- 2019-01- ELABORACIÓN DE LA TF / 18478 Programs for Sustainable Posterior Open - National 250,000.00 241,752.68 Finalizado calificaciones de 25 18 16 29 15 29 12 02 12 30 31 EVALUACIÓN AMBIENTAL Landscape Management consultores ESTRATÉGICA REGIONAL DEL ARCO NOROCCIDENTAL AMAZÓNICO" CO-PNF-54334-CS-QCBS / ELABORACIÓN DE LA GUÍA AMBIENTAL PARA LA Component 3 - Sectoral Selección IMPLEMENTACIÓN DEL 2018-05- 2017-11- 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2018-08- 2018-08- 2018-08- 2018-09- 2018-08- 2018-10- 2019-04- 2019-06- TF / 18478 Programs for Sustainable Posterior basada en Open - National 92,595.00 90,019.00 Finalizado CONPES 3857 DE 2016 15 09 05 21 03 21 03 01 06 20 18 30 08 30 07 Landscape Management calidad y costo LINEAMIENTOS DE POLÍTICA PARA LA GESTIÓN DE LA RED TERCIARIA CO-PNF-21283-CS-QCBS / Component 2 - Forest Selección Consultoría para 2017-09- 2017-09- 2017-11- 2017-11- 2017-12- 2018-02- 2018-03- 2018-09- TF / 18478 Governance, Management Posterior basada en Open - National 111,111.00 0.00 Cancelado fortalecimiento del sistema 04 18 01 29 29 02 09 05 and Monitoring calidad y costo de información SIGAE CO-PNF-17816-CS-QCBS / Fortalecimiento del SISA - Component 2 - Forest Selección 2017-08- 2017-08- 2017-09- 2017-10- 2017-10- 2017-10- 2017-11- 2018-05- Monitoreo para la TF / 18478 Governance, Management Posterior basada en Open - National 51,852.00 0.00 Cancelado 08 23 06 06 11 23 07 06 trazabilidad de la madera - and Monitoring calidad y costo Corpoamazonia CO-PNF-75480-CS-CQS / Desarrollar una expedición científica en la ventana Mesay en el sector sur del Selección Component 1 - Protected Parque. Que a su vez basada en 2018-09- 2018-07- 2018-10- 2018-11- 2018-09- 2018-12- 2019-01- 2019-01- 2019-02- 2019-11- 2019-07- TF / 18478 Areas Management and Posterior Open - National 83,071.00 69,759.36 Finalizado identifique oportunidades y calificaciones de 20 31 11 23 27 23 31 17 21 20 08 Financial Sustainability aporte elementos técnicos consultores que fortalezcan las líneas de investigación y el Programa de Monitoreo CO-PNF-103506-CS-QCBS Component 1 - Protected Selección / Elaboración del modelo de 2019-06- 2019-06- 2019-07- 2019-09- 2019-09- 2019-10- 2019-10- 2020-04- TF / A5789 Areas Management and Posterior basada en Open - National 137,742.00 0.00 Cancelado datos para el Sistema 14 28 22 06 15 06 26 26 Financial Sustainability calidad y costo Integrado de Gestión. CO-PNF-137107-CS-LCS / Formular el Plan de Manejo del área protegida Natural Regional Miraflores Picachos bajo un esquema Component 1 - Protected Selección de coordinación 2019-10- 2019-10- 2019-11- 2020-01- 2020-10- 2020-01- 2020-11- 2020-03- 2020-04- 2020-05- 2020-11- TF / A5789 Areas Management and Posterior basada en el Open - National 129,032.00 0.00 En ejecución interinstitucional, 30 23 20 03 22 31 23 01 05 10 06 Financial Sustainability menor costo participación comunitaria, concertación social y fortamecimiento de capacidades de las partes interesadas CO-PNF-137133-CS-CQS / Diseño de un Sistema integrado de gestión Selección Component 1 - Protected administrativa, financiera y basada en 2020-08- 2020-09- 2020-11- 2020-12- 2021-01- 2021-09- TF / A5789 Areas Management and Posterior Open - National 17,419.00 0.00 Cancelado técnica para FPN: calificaciones de 31 21 04 04 08 06 Financial Sustainability levantamiento de consultores requerimientos internos y externos. CO-PNF-178662-CS-CQS / Auditoría de los recursos administrados y pagados Component 4 - Project Selección por Patrimonio Natural y el Coordination, basada en 2020-07- 2020-07- 2020-07- 2020-09- 2020-09- 2020-10- 2020-11- 2020-11- 2020-11- 2021-02- 2021-02- Instituto SINCHI bajo el TF / A5789 Posterior Open - National 14,516.00 11,658.40 Finalizado Management, Monitoring calificaciones de 03 02 24 06 23 06 13 03 27 16 25 (P158003-TFA5789) de la and Evaluation (M&E) consultores financiación adicional y GEF PPG No. TF0B1287-CO del Proyecto CO-PNF-184783-CS-CQS / Diagnosticar, definir y diseñar la Arquitectura Empresarial de Patrimonio Selección Component 1 - Protected Natural, evaluar las basada en 2020-09- 2021-05- 2020-10- 2020-12- 2021-01- 2021-01- 2021-07- TF / A5789 Areas Management and Posterior Open - National 50,746.00 0.00 En ejecución herramientas tecnológicas calificaciones de 30 28 21 04 03 24 23 Financial Sustainability actuales, proponer y definir consultores escenarios de integración en un Sistema de Información funcional, seguro y eficiente para el procesamient INDIVIDUAL CONSULTANTS Activity Reference No. Actual Invitation to Loan / Credit Market Contract Type Estimated Process Draft Negotiated / Description Component Review Type Method Amount Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Status Contract (US$) Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-PNF-17988-CS-INDV / Profesional para la Component 3 - Sectoral 2017-02- 2017-02- 2017-03- 2017-03- 2017-03- 2017-12- 2018-01- coordinación y desarrollo TF / 18478 Programs for Sustainable Posterior Individual Limited 26,667.00 25,174.80 Finalizado 15 22 01 16 16 20 15 de las actividades del Landscape Management resultado 3.2 - 2017 CO-PNF-17984-CS-INDV / Consultoria para coordinar Component 3 - Sectoral 2017-02- 2017-02- 2017-02- 2017-03- 2017-03- 2017-03- 2017-12- 2017-12- la ruta de ampliación de TF / 18478 Programs for Sustainable Posterior Individual Limited 22,407.00 21,264.54 Finalizado 15 27 22 01 16 16 20 22 PNN SCH en los Landscape Management departamentos de Guaviare y Caqueta CO-PNF-17966-CS-INDV / Consultoría para preparar Component 4 - Project un documento de Coordination, 2017-07- 2017-07- 2017-07- 2017-08- 2016-10- 2017-09- 2016-11- caracterización TF / 18478 Posterior Individual Limited 3,704.00 3,580.40 Finalizado Management, Monitoring 19 24 31 11 05 11 07 demográfica, económica y and Evaluation (M&E) del estado legal del territorio para el polígono de intervención del GEF 6. CO-PNF-17967-CS-INDV / Consultoría para Identificar y definir el esquema Component 4 - Project conceptual y metodológico Coordination, 2017-07- 2017-07- 2017-07- 2017-08- 2016-11- 2017-09- 2016-12- necesario para organizar TF / 18478 Posterior Individual Limited 3,704.00 3,580.40 Finalizado Management, Monitoring 19 24 31 14 04 13 03 una red de sitios intensivos and Evaluation (M&E) de monitoreo que genere información científica sobre el papel de los bosques naturales de la Amazonía. CO-PNF-18001-CS-INDV / Component 1 - Protected 2017-07- 2017-01- 2017-07- 2017-08- 2017-09- 2017-02- 2017-10- 2017-08- Interventoria adecuación TF / 18478 Areas Management and Posterior Individual Limited 12,393.00 11,699.49 Finalizado 21 16 26 16 20 20 10 19 sede San José del Guaviare Financial Sustainability CO-PNF-18004-CS-INDV / Component 3 - Sectoral 2017-06- 2017-02- 2017-08- 2017-08- 2017-09- 2017-03- 2017-12- 2017-12- Profesionales SIG - CDA TF / 18478 Programs for Sustainable Posterior Individual Open 14,815.00 14,038.40 Finalizado 13 27 01 22 26 16 20 20 Ordenamiento - 2017 Landscape Management CO-PNF-21090-CS-INDV / Consultor para la generación de cartografía Component 3 - Sectoral de las actuaciones 2017-08- 2017-08- 2017-08- 2017-08- 2017-08- 2017-08- 2017-10- 2017-11- TF / 18478 Programs for Sustainable Posterior Individual Direct 4,074.00 3,337.07 Finalizado adelantadas en el marco de 01 18 04 11 22 25 21 07 Landscape Management la estrategia integral de control de la deforestación y la implementación de los acuerdos de paz. CO-PNF-21094-CS-INDV / Profesional para Component 2 - Forest 2017-08- 2017-08- 2017-08- 2017-09- 2017-11- 2017-12- 2018-11- seguimiento de actividades TF / 18478 Governance, Management Posterior Individual Open 8,000.00 22,657.32 Finalizado 01 18 25 04 16 28 15 técnicas y ejecución del and Monitoring componente de monitoreo. Segundo semestre. CO-PNF-21481-CS-INDV / Consultoría para la generación de la cartografía de las actuaciones Component 3 - Sectoral 2017-09- 2017-09- 2017-10- 2017-10- 2018-05- 2018-01- 2019-01- adelantadas en el marco de TF / 18478 Programs for Sustainable Posterior Individual Limited 4,444.00 4,203.84 Finalizado 05 10 01 22 31 20 19 la Estrategia Integral de Landscape Management Control de la Deforestación en el Municipio de Calamar, El Retorno, San Vicente, Solano y Cartagena del Chairá. CO-PNF-17977-CS-CDS / Profesional en sistema de información geográfica y Component 2 - Forest sensores remotos que 2017-02- 2017-02- 2017-02- 2017-02- 2017-03- 2017-02- 2017-12- 2017-03- TF / 18478 Governance, Management Posterior Individual Direct 18,578.00 3,426.57 Finalizado adelante el procesamiento 15 13 18 21 04 15 20 31 and Monitoring de imágenes y reporte de alertas tempranos de deforestacion - Guaviare CDA- 2017 CO-PNF-17991-CS-CDS / Component 2 - Forest 2017-02- 2017-03- 2017-03- 2017-03- 2017-04- 2017-04- 2017-12- 2017-05- Profesional para TF / 18478 Governance, Management Posterior Individual Direct 18,864.00 5,754.08 Finalizado 15 31 11 25 29 03 20 30 coordinación y desarrollo and Monitoring PPI PNN - 2017 CO-PNF-26455-CS-INDV / Profesional especializado en sistemas de información Component 2 - Forest geográfica, sensores 2017-01- 2017-01- 2017-02- 2017-02- 2017-03- 2017-12- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 41,280.00 24,572.67 Finalizado remotos, y monitoreo de 13 27 03 15 10 20 20 and Monitoring recursos naturales encargados en control Temático de Calidad - SYMBC - 2017 CO-PNF-26462-CS-INDV / Component 2 - Forest Administración, 2017-01- 2017-02- 2017-01- 2017-01- 2017-02- 2017-02- 2017-12- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 38,400.00 36,441.45 Finalizado actualización y operación 09 13 23 30 15 15 20 20 and Monitoring de la plataforma tecnologica del SMBYC CO-PNF-26465-CS-INDV / Component 2 - Forest Experto en monitoreo 2017-01- 2017-02- 2017-01- 2017-02- 2017-02- 2017-02- 2017-12- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 36,000.00 34,163.86 Finalizado ,reporte y verificación - 09 13 25 02 15 15 20 20 and Monitoring MVR del SMBYC - 2017 CO-PNF-26466-CS-INDV / Profesional experto en estructurador de Información, que apoyara la Component 2 - Forest 2017-01- 2017-07- 2017-01- 2017-02- 2017-02- 2017-02- 2017-12- 2017-12- generación, estandarización TF / 18478 Governance, Management Posterior Individual Direct 21,778.00 20,512.97 Finalizado 09 02 25 02 15 15 20 20 y documentación de la and Monitoring información geográfica de deforestacion a nivel nacional y subnacional - 2017 CO-PNF-26464-CS-INDV / Profesional en ciencias naturales especializado en Component 3 - Sectoral la Gestión de Áreas 2017-01- 2017-01- 2017-02- 2017-03- 2017-03- 2017-09- 2018-01- TF / 18478 Programs for Sustainable Posterior Individual Direct 20,370.00 19,302.80 Finalizado Protegidas, como apoyo a la 10 20 10 17 16 13 15 Landscape Management Corporación para el Desarrollo Sostenible del Nor Oriente Amazónico- CDA - 2017 CO-PNF-26467-CS-INDV / Profesional en sistema de información geográfica y sensores remotos que Component 2 - Forest 2017-01- 2017-02- 2017-01- 2017-02- 2017-02- 2017-02- 2017-12- 2017-12- adelante el procesamiento TF / 18478 Governance, Management Posterior Individual Direct 18,578.00 17,441.13 Finalizado 09 13 25 02 15 15 20 20 de imágenes y reporte de and Monitoring alertas tempranos de deforestacion CORPOAMAZONIA- Caqueta - 2017 Component 2 - Forest CO-PNF-26459-CS-INDV / 2017-01- 2017-02- 2017-01- 2017-02- 2017-02- 2017-02- 2017-12- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 40,889.00 38,745.98 Finalizado Lider Temático de Carbono 09 13 25 02 15 15 20 20 and Monitoring CO-PNF-26461-CS-INDV / Component 1 - Protected 2017-01- 2017-01- 2017-02- 2017-02- 2017-02- 2017-12- 2017-12- Enlace PNN Serranía de TF / 18478 Areas Management and Posterior Individual Direct 30,531.00 28,822.63 Finalizado 09 25 02 15 23 20 22 Chiribiquete PNN - 2017 Financial Sustainability Component 4 - Project CO-PNF-26458-CS-INDV / Coordination, 2017-01- 2017-01- 2017-02- 2017-02- 2017-02- 2017-12- Profesional seguimiento - TF / 18478 Posterior Individual Direct 40,422.00 38,360.53 Firmado Management, Monitoring 09 26 03 23 23 20 2017 and Evaluation (M&E) CO-PNF-26463-CS-INDV / Component 4 - Project GEF 6. Consolidación plan Coordination, 2016-10- 2016-10- 2016-10- 2016-11- 2017-06- 2016-12- 2017-08- de adquisiciones, TF / 18478 Posterior Individual Direct 1,019.00 1,923.08 Finalizado Management, Monitoring 01 17 23 02 27 30 26 elaboración manual and Evaluation (M&E) operativo, borrador acuerdo interinstitucional Component 4 - Project CO-PNF-31993-CS-INDV / Coordination, 2017-01- 2017-01- 2017-01- 2017-02- 2017-02- 2017-12- 2017-12- Especialista financiero - TF / 18478 Posterior Individual Direct 27,685.00 26,195.80 Finalizado Management, Monitoring 02 10 15 23 23 20 22 2017 VF and Evaluation (M&E) CO-PNF-32008-CS-INDV / Profesional para Component 2 - Forest seguimiento de actividades 2017-01- 2017-02- 2017-01- 2017-01- 2017-02- 2017-02- 2017-12- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 24,000.00 22,775.90 Finalizado administrativas y 02 13 12 17 15 15 20 20 and Monitoring financieras del componente de Monitoreo de Bosques y Carbono Component 4 - Project CO-PNF-31987-CS-INDV / Coordination, 2017-01- 2017-01- 2017-01- 2017-02- 2017-02- 2017-12- 2017-12- Coordinador general del TF / 18478 Posterior Individual Direct 52,311.00 49,643.04 Finalizado Management, Monitoring 20 25 30 23 23 02 20 proyecto - 2017 and Evaluation (M&E) Component 4 - Project CO-PNF-31985-CS-INDV / Coordination, 2016-12- 2016-12- 2017-01- 2017-01- 2015-06- 2017-12- 2019-05- Asistente administrativo - TF / 18478 Posterior Individual Direct 9,333.00 4,296.36 Finalizado Management, Monitoring 29 31 01 04 01 20 30 2017 and Evaluation (M&E) CO-PNF-31995-CS-INDV / Profesional en ciencias Component 2 - Forest naturales para seguimiento 2017-01- 2017-01- 2017-01- 2017-02- 2017-02- 2017-12- 2018-01- TF / 18478 Governance, Management Posterior Individual Direct 14,000.00 22,775.90 Finalizado de actividades técnicas y 02 07 12 15 15 20 14 and Monitoring ejecucion del componente de Monitoreo - 2017 Page 5 CO-PNF-31983-CS-INDV / Profesional en sistema de información geográfica y Component 2 - Forest sensores remotos que 2017-01- 2017-02- 2017-01- 2017-01- 2017-01- 2017-02- 2017-12- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 18,578.00 17,441.13 Finalizado adelante el procesamiento 02 13 07 12 19 15 20 20 and Monitoring de imágenes y reporte de alertas tempranos de deforestacion - Guaviare CDA- 2017 CO-PNF-31984-CS-INDV / Profesional Component 2 - Forest acompañamiento 2017-03- 2017-04- 2017-04- 2017-05- 2017-05- 2017-12- 2018-01- TF / 18478 Governance, Management Posterior Individual Direct 11,852.00 11,188.80 Finalizado resguardos indigenas plan 28 07 12 15 15 20 14 and Monitoring cultural de ordenamiento y manejo y sistematización de chagras 2017 CO-PNF-32010-CS-INDV / Component 1 - Protected 2017-01- 2017-01- 2017-01- 2017-02- 2017-02- 2017-12- 2018-01- Profesional Administrativo TF / 18478 Areas Management and Posterior Individual Direct 21,400.00 20,687.55 Finalizado 01 11 16 15 15 20 14 PNN_DTAM - 2017 Financial Sustainability CO-PNF-34497-CS-INDV / Profesional SIG PNNSCH, Brindar los apoyos técnicos en sistemas de información Component 1 - Protected geográfica para la 2017-11- 2017-11- 2017-11- 2017-11- 2017-12- 2017-03- 2018-08- 2018-01- TF / 18478 Areas Management and Posterior Individual Direct 8,587.00 21,005.57 Finalizado generación de insumos 15 01 19 24 08 16 10 15 Financial Sustainability cartográficos, análisis espaciales y elaboración de aportes técnicos al equipo involucrado en el proyecto GEF y la DTAM Component 4 - Project CO-PNF-17963-CS-INDV / Coordination, 2017-07- 2017-08- 2017-08- 2017-09- 2018-01- 2018-09- 2018-12- Especialista de TF / 18478 Posterior Individual Limited 44,444.00 42,062.40 Finalizado Management, Monitoring 26 19 24 01 02 01 28 Adquisiciones - 2017 and Evaluation (M&E) CO-PNF-17979-CS-INDV / Component 1 - Protected 2017-02- 2017-03- 2017-02- 2017-01- 2017-03- 2017-03- 2017-03- 2017-12- 2017-12- Profesional SIG PNNSCH - TF / 18478 Areas Management and Posterior Individual Limited 22,131.00 20,974.49 Finalizado 15 16 22 20 01 16 16 20 20 2017 Financial Sustainability CO-PNF-34457-CS-INDV / Experto análisis de conectividad ecosístemica- Component 3 - Sectoral Formular una metodología 2017-11- 2017-11- 2017-12- 2018-01- 2018-02- 2018-05- 2018-08- TF / 18478 Programs for Sustainable Posterior Individual Limited 17,778.00 16,984.80 Finalizado homologada para realizar 15 30 14 02 28 30 27 Landscape Management los estudios de conectividad ecológica del paisaje regional , subregional y local. CO-PNF-17997-CS-CDS / Consultoria Generacion de Component 2 - Forest Selección directa 2017-06- 2017-07- 2017-09- 2017-10- 2018-01- 2018-03- información de campo TF / 18478 Governance, Management Posterior Direct 83,988.00 81,192.17 Finalizado de consultores 13 23 03 24 31 23 relacionada con el and Monitoring monitoreo del Carbono CO-PNF-26457-CS-INDV / Profesional en ciencias Component 3 - Sectoral 2017-03- 2017-04- 2017-03- 2017-03- 2017-04- 2017-04- 2017-12- 2017-12- naturales especializado en TF / 18478 Programs for Sustainable Posterior Individual Direct 25,000.00 23,689.80 Finalizado 02 04 18 28 18 18 20 20 la Gestión de Áreas Landscape Management Protegidas, como apoyo a Corpoamazonía CO-PNF-26460-CS-INDV / Profesional especializado en sistema de informacion Component 2 - Forest geográfica, sensores 2017-01- 2017-02- 2017-01- 2017-02- 2017-02- 2017-03- 2017-12- 2017-12- TF / 18478 Governance, Management Posterior Individual Direct 41,280.00 24,536.32 Finalizado remotos / monitoreo de 17 23 31 05 15 10 20 20 and Monitoring recursos naturales que lidera el procesamiento digital de imagenes - 2017 CO-PNF-26456-CS-INDV / Component 3 - Sectoral 2017-01- 2017-01- 2017-01- 2017-02- 2017-02- 2017-02- 2017-12- 2017-12- Experto en Áreas Protegidas TF / 18478 Programs for Sustainable Posterior Individual Direct 30,531.00 28,822.63 Finalizado 09 10 25 02 23 23 20 20 PNN - 2017 Landscape Management CO-PNF-34496-CS-INDV / Component 1 - Protected 2017-11- 2017-11- 2017-11- 2017-12- 2018-04- 2018-09- 2018-12- Interventoria centro de TF / 18478 Areas Management and Posterior Individual Limited 21,667.00 20,247.80 Finalizado 06 21 26 11 18 07 29 investigación Puerto Abeja Financial Sustainability CO-PNF-38842-CS-INDV / Component 1 - Protected PNN-Profesional de enlace 2017-11- 2017-12- 2017-12- 2018-01- 2018-01- 2018-06- 2018-12- TF / 18478 Areas Management and Posterior Individual Direct 15,750.00 15,419.57 Finalizado entre PNN DTAM y áreas 30 10 15 03 02 30 28 Financial Sustainability protegidas-2018 CO-PNF-38845-CS-INDV / Líder junior en Component 2 - Forest procesamiento digital para 2017-11- 2017-12- 2017-12- 2018-01- 2018-01- 2018-12- 2018-11- TF / 18478 Governance, Management Posterior Individual Direct 26,503.00 25,825.93 Finalizado capacitación y transferencia 30 10 15 03 02 20 30 and Monitoring del SMBYC a autoridades ambientales - 2018 CO-PNF-38849-CS-INDV / Profesional especializado en sistema de información Component 2 - Forest geográfica, sensores 2017-11- 2017-12- 2017-12- 2018-01- 2018-01- 2018-12- 2018-12- TF / 18478 Governance, Management Posterior Individual Direct 42,591.00 41,308.83 Finalizado remotos / monitoreo de 30 10 15 03 02 20 20 and Monitoring recursos naturales que lidera el procesamiento digital de imágenes - 2018 CO-PNF-38851-CS-INDV / Component 2 - Forest 2017-11- 2017-12- 2018-01- 2018-01- 2018-05- 2018-12- 2018-12- Experto en Monitoreo, TF / 18478 Governance, Management Posterior Individual Limited 37,144.00 22,261.68 Finalizado 30 30 04 21 07 20 06 Reporte y Verificación - and Monitoring MVR -2018 CO-PNF-38854-CS-INDV / Component 2 - Forest 2017-11- 2017-12- 2017-12- 2018-01- 2018-01- 2018-12- 2018-12- Líder Temático en Carbono- TF / 18478 Governance, Management Posterior Individual Direct 39,429.00 38,780.21 Finalizado 30 10 15 03 02 20 20 2018 and Monitoring CO-PNF-38855-CS-INDV / Profesional especializado en SIG, sensores remotos, y Component 2 - Forest 2017-11- 2017-12- 2017-12- 2018-01- 2018-01- 2018-12- 2018-12- monitoreo de recursos TF / 18478 Governance, Management Posterior Individual Direct 32,057.00 31,462.68 Finalizado 30 10 15 03 02 20 20 naturales encargados en and Monitoring control Temático de Calidad - SYMBC- 2018- CO-PNF-38857-CS-INDV / Component 2 - Forest COORDINADOR 2017-11- 2017-12- 2017-12- 2018-01- 2018-01- 2018-12- 2018-12- TF / 18478 Governance, Management Posterior Individual Direct 33,364.00 33,010.89 Finalizado DESARROLLO DE PLANES DE 30 10 15 03 02 20 28 and Monitoring PUEBLOS INDÍGENAS- 2018 CO-PNF-38860-CS-INDV / PROFESIONAL Component 2 - Forest 2017-11- 2017-12- 2017-12- 2018-01- 2018-01- 2018-11- 2018-12- FORMULACIÓN PLAN TF / 18478 Governance, Management Posterior Individual Direct 19,643.00 19,319.85 Finalizado 30 10 15 03 02 20 20 CULTURAL DE MANEJO Y and Monitoring SISTEMATIZACION DE CHAGRAS- 2018 CO-PNF-38868-CS-INDV / Component 2 - Forest Consultoría para el diseño 2017-11- 2017-12- 2017-12- 2018-01- 2018-01- 2018-05- 2018-06- TF / 18478 Governance, Management Posterior Individual Direct 8,929.00 8,741.25 Finalizado del diplomado gobernanza 30 07 12 02 15 30 14 and Monitoring y gobierno propio CO-PNF-38870-CS-INDV / Consultoría para el diseño del componente Component 2 - Forest 2017-11- 2017-12- 2017-12- 2018-01- 2018-01- 2018-05- 2018-06- pedagógico y didáctico de TF / 18478 Governance, Management Posterior Individual Direct 8,929.00 8,758.00 Finalizado 30 10 17 02 05 30 04 los diplomados para la and Monitoring formación en gobernanza indígena y diálogo de saberes CO-PNF-38986-CS-INDV / Consultoría para el diseño Component 2 - Forest de una plataforma para la 2017-12- 2017-12- 2017-12- 2018-01- 2018-01- 2018-04- 2018-06- TF / 18478 Governance, Management Posterior Individual Direct 16,071.00 15,734.25 Finalizado formación en gobernanza 01 11 18 02 22 26 21 and Monitoring indígena y gestión del conocimiento de los bosques CO-PNF-38990-CS-INDV / Consultoria para el diseño Component 2 - Forest del diplomado en proyectos 2017-12- 2017-12- 2017-12- 2018-01- 2018-01- 2018-05- 2018-06- TF / 18478 Governance, Management Posterior Individual Direct 8,929.00 8,741.25 Finalizado productivos y alternativas 01 11 18 02 04 30 03 and Monitoring locales generadoras de ingresos. CO-PNF-38991-CS-INDV / Component 2 - Forest Consultoría para el diseño 2017-12- 2017-12- 2017-12- 2018-01- 2018-01- 2018-05- 2018-05- TF / 18478 Governance, Management Posterior Individual Direct 8,929.00 8,741.25 Finalizado del diplomado en 01 11 18 02 04 30 30 and Monitoring estrategias para la convivencia y el buen vivir. CO-PNF-38995-CS-INDV / Profesional CDA Ruta Declaratoria 2018- Liderar en representación de la Component 3 - Sectoral CDA el proceso de 2017-12- 2017-12- 2017-12- 2018-01- 2018-02- 2018-12- 2018-08- TF / 18478 Programs for Sustainable Posterior Individual Direct 11,464.00 11,764.65 Finalizado implementación de la ruta 01 11 18 02 19 20 18 Landscape Management declaratoria de nuevas áreas protegidas regionales y la gestión de las prioridades y estrategias de conservación existentes en el departame CO-PNF-39001-CS-INDV / Profesional de apoyo para Component 3 - Sectoral la implementación de 2017-12- 2017-12- 2017-12- 2018-01- 2018-01- 2018-12- 2018-12- TF / 18478 Programs for Sustainable Posterior Individual Direct 33,017.00 32,324.44 Finalizado acuerdos con el sector de 01 11 18 02 02 20 20 Landscape Management infraestructura e hidrocarburos CO-PNF-39002-CS-INDV / Consultoria jurídica para la Component 3 - Sectoral inclusión de corredores de 2017-12- 2017-12- 2017-12- 2018-01- 2018-01- 2018-12- 2018-12- TF / 18478 Programs for Sustainable Posterior Individual Direct 42,857.00 41,958.00 Finalizado conectividad ecológica 04 14 21 02 02 20 20 Landscape Management como determinante ambiental en evaluación de proyectos Component 4 - Project CO-PNF-39009-CS-INDV / Coordination, 2017-12- 2017-12- 2017-12- 2018-01- 2018-01- 2018-12- 2018-12- Profesional de seguimiento TF / 18478 Posterior Individual Direct 41,704.00 40,829.33 Finalizado Management, Monitoring 01 11 16 02 02 20 20 y monitoreo- 2018 and Evaluation (M&E) Component 4 - Project CO-PNF-39010-CS-INDV / Coordination, 2017-12- 2017-12- 2017-12- 2018-01- 2018-01- 2018-12- 2018-12- Coordinación general del TF / 18478 Posterior Individual Direct 57,857.00 56,784.24 Finalizado Management, Monitoring 01 11 16 04 02 20 28 proyecto- 2018 and Evaluation (M&E) Component 4 - Project CO-PNF-39014-CS-INDV / Coordination, 2017-12- 2017-12- 2017-12- 2018-01- 2018-01- 2018-12- 2018-12- Especialista financiera- TF / 18478 Posterior Individual Direct 32,036.00 31,508.92 Finalizado Management, Monitoring 01 11 16 02 02 20 20 2018 and Evaluation (M&E) CO-PNF-43099-CS-INDV / Consultoría para la elaboración de los procedimientos que le Component 3 - Sectoral compete adelantar a la 2018-01- 2018-01- 2018-02- 2018-03- 2018-04- 2019-02- 2019-04- TF / 18478 Programs for Sustainable Posterior Individual Limited 17,679.00 20,813.94 Finalizado CDA, en materia de 16 24 14 21 20 21 19 Landscape Management evaluación y seguimiento ambiental y ejercicio de control y vigilancia de intervención en el Departamento del Guaviare CO-PNF-43106-CS-INDV / Consultoría para la elaboración de procedimientos que le compete adelantar a Component 3 - Sectoral CORMACARENA, en materia 2018-01- 2018-01- 2018-02- 2018-03- 2018-05- 2019-02- 2019-04- TF / 18478 Programs for Sustainable Posterior Individual Limited 17,679.00 17,491.32 Finalizado de evaluación y 16 24 14 21 10 21 09 Landscape Management seguimiento ambiental y ejercicio de control y vigilancia de intervenciones en infraestructura de transporte en el Departamento Sur del Me CO-PNF-43111-CS-INDV / Consultoría para la elaboración de procedimientos que le compete adelantar a Component 3 - Sectoral CORPOAMAZONIA, en 2018-01- 2018-01- 2018-02- 2018-03- 2018-04- 2019-02- 2019-06- TF / 18478 Programs for Sustainable Posterior Individual Limited 17,769.00 20,813.94 Finalizado materia de evaluación y 16 24 14 21 20 21 24 Landscape Management seguimiento ambiental y ejercicio de control y vigilancia de intervenciones en infraestructura de transporte en el Departamento Putumayo CO-PNF-41751-CS-INDV / Consultoría para la elaboración de un estudio Component 3 - Sectoral 2017-12- 2018-01- 2018-01- 2018-02- 2018-04- de caracterización del TF / 18478 Programs for Sustainable Posterior Individual Limited 3,571.00 0.00 Cancelado 29 03 24 28 29 potencial de producción y Landscape Management mercadeo de especies maderables y no maderables de bosque. CO-PNF-41752-CS-INDV / Consultoría para el diseño del arreglo institucional Component 3 - Sectoral 2017-12- 2018-01- 2018-01- 2018-02- 2018-04- (roles de autoridades TF / 18478 Programs for Sustainable Posterior Individual Limited 3,571.00 0.00 Cancelado 29 03 24 28 29 ambientales y territoriales, Landscape Management organizaciones sociales) para el fomento del manejo forestal sostenible CO-PNF-41749-CS-INDV / Consultoría para la Component 3 - Sectoral 2017-12- 2018-01- 2018-01- 2018-02- 2018-05- evaluación de TF / 18478 Programs for Sustainable Posterior Individual Limited 6,429.00 0.00 Cancelado 29 03 17 21 22 prefactibilidad de una Landscape Management iniciativa de manejo diversificado del bosque CO-PNF-55711-CS-INDV / servicios profesionales para realizar la caracterización Component 4 - Project biofísica de los motores de Coordination, 2018-04- 2018-05- 2018-05- 2018-06- 2018-05- 2018-10- 2018-09- TF / 18478 Posterior Individual Limited 10,714.00 10,509.60 Finalizado fragmentación, agentes, Management, Monitoring 26 01 22 26 31 26 30 causas directas y énfasis en and Evaluation (M&E) causas subyacentes a nivel regional. CO-PNF-55712-CS-INDV / Realizar la caracterización social de los motores de fragmentación, agentes, causas directas y énfasis en Component 3 - Sectoral 2018-04- 2018-04- 2018-05- 2018-06- 2018-05- 2018-10- 2018-09- causas subyacentes a nivel TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 10,509.60 Finalizado 25 30 21 25 31 26 30 regional y la identificación Landscape Management de oportunidades para atenuar los riesgos frente a la fragmentación y potenciar las fortaleza CO-PNF-55713-CS-INDV / Servicios profesionales para aplicar herramientas de análisis espacial e interpretación de Component 3 - Sectoral 2018-04- 2018-04- 2018-05- 2018-06- 2018-05- 2018-10- 2018-09- coberturas de la tierra, para TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 10,509.60 Finalizado 25 30 21 25 31 25 30 realizar el control de Landscape Management calidad de la interpretación de coberturas de la tierra según metodología Corine Land Cover, de acuerdo a los p Page 6 CO-PNF-55714-CS-INDV / Prestar los servicios profesionales para realizar la gestión, análisis y Component 3 - Sectoral modelación de la 2018-04- 2018-04- 2018-05- 2018-06- 2018-05- 2018-10- 2018-09- TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 10,509.60 Finalizado información 25 30 21 25 31 25 30 Landscape Management georreferenciada, para realizar el análisis de conectividad y motores de fragmentación con énfasis en causas subyacentes a nivel regional. CO-PNF-54326-CS-CDS / Component 4 - Project AUDITORIA EXTERNA PARA Coordination, Selección directa 2018-05- 2018-05- 2018-06- 2018-07- 2018-08- 2018-09- 2018-11- 2018-11- TF / 18478 Posterior Direct 12,600.00 9,340.80 Finalizado EL PROYECTO GEF-CA AÑO Management, Monitoring de consultores 24 04 03 09 16 04 30 30 2018 and Evaluation (M&E) CO-PNF-63402-CS-INDV / Coordinar, orientar y liderar la implementación de los Component 3 - Sectoral 2018-07- 2018-07- 2018-07- 2018-08- 2018-07- 2019-08- 2019-07- acuerdos de conservación, TF / 18478 Programs for Sustainable Posterior Individual Limited 28,965.00 27,140.40 Finalizado 02 07 21 13 26 12 31 restauración y no Landscape Management deforestación - CORPOAMAZONIA CO-PNF-17965-CS-INDV / Component 4 - Project Consultoria para realizar la Coordination, 2018-04- 2018-05- 2018-05- 2018-06- 2018-07- Misión de Evaluación de TF / 18478 Posterior Individual Open 16,071.00 0.00 Cancelado Management, Monitoring 08 04 19 02 02 Medio Término del Proyecto and Evaluation (M&E) GEF Corazón de la Amazonia CO-PNF-38992-CS-INDV / Coordinación editorial y diseño, edición y Component 2 - Forest diagramación- 2017-12- 2017-12- 2017-12- 2018-01- 2018-06- TF / 18478 Governance, Management Posterior Individual Limited 14,286.00 0.00 Cancelado estructuración de la 01 07 21 19 19 and Monitoring plataforma intercultural para la formación de gobernanza indígena y diálogo de saberes. CO-PNF-54443-CS-INDV / Profesional en mercadeo, comercio exterior, ciencias económicas o carreras afines que formule la Component 3 - Sectoral 2018-08- 2019-01- 2018-09- 2019-03- 2018-09- 2019-03- 2018-10- 2019-03- 2019-05- 2019-07- estrategia de mercadeo y de TF / 18478 Programs for Sustainable Posterior Individual Limited 14,814.00 11,561.20 Finalizado 30 15 04 22 25 22 30 22 01 25 encadenamiento productivo Landscape Management de maderables y no maderables priorizados en el área de jurisdicción de ASOCAPRICHO. CO-PNF-54442-CS-INDV / Profesional en biólogía o carreras afines que realicela Component 3 - Sectoral 2018-08- 2018-08- 2018-09- 2018-10- 2018-09- 2019-04- 2019-04- caracterización faunística y TF / 18478 Programs for Sustainable Posterior Individual Limited 14,444.00 12,600.90 Finalizado 16 21 11 16 14 17 24 sitios de ecoturismo en las Landscape Management veredas de jurisdicción de ASOCAPRICO. CO-PNF-55709-CS-INDV / Profesional en comunicación social que Component 4 - Project genere contenidos para los Coordination, 2018-08- 2018-08- 2018-08- 2018-09- 2018-08- 2019-08- distintos medios de TF / 18478 Posterior Individual Limited 25,715.00 17,447.40 Firmado Management, Monitoring 16 21 28 13 29 30 comunicación, en el marco and Evaluation (M&E) de la estrategia de comunicación local de Visión Amazonia, que permitan mostrar avances y resultados del Proyecto. CO-PNF-55710-CS-INDV / Formulación de escenarios de gobernanza para el manejo integrado de estrategias de conservación Component 1 - Protected 2018-08- 2018-07- 2018-08- 2018-08- 2018-09- 2018-12- 2018-10- 2018-12- 2019-05- 2019-06- y producción sostenible, en TF / 18478 Areas Management and Posterior Individual Limited 14,285.00 8,829.87 Finalizado 15 13 20 15 05 12 03 12 21 30 el ámbito de los mosaicos Financial Sustainability Corazón de la Amazonia y Piedemonte, definidos por Herencia Colombia, a partir de la caracterización terr CO-PNF-41747-CS-INDV / Consultoría para la construcción de criterios ambientales para la Component 3 - Sectoral 2017-12- 2018-01- 2018-01- 2018-02- 2019-02- elegibilidad y priorización TF / 18478 Programs for Sustainable Posterior Individual Limited 19,286.00 0.00 Cancelado 29 03 17 21 21 de proyectos de la red Landscape Management básica/modos y logística del Plan Maestro de Transporte Intermodal. CO-PNF-41748-CS-INDV / Consultoría para la construcción de criterios ambientales para la Component 3 - Sectoral 2017-12- 2018-01- 2018-01- 2018-02- 2019-02- elegibilidad y priorización TF / 18478 Programs for Sustainable Posterior Individual Limited 19,286.00 0.00 Cancelado 29 03 24 28 28 de proyectos de la red de Landscape Management integración/modos logística del Plan Maestro de Transporte intermodal. CO-PNF-41755-CS-INDV / Análisis actualizado del estado de la conectividad Component 3 - Sectoral ecosistémica Andes- 2017-12- 2018-01- 2018-01- 2018-02- 2018-06- TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 0.00 Cancelado Amazonia y Orinoquia, útil 29 03 24 28 28 Landscape Management para la generación de alertas y la comunicación incidente con autorid CO-PNF-21088-CS-INDV / Experto en SIG - Análisis espacial para el Component 3 - Sectoral ordenamiento ambiental 2017-08- 2017-08- 2017-08- 2017-09- 2017-11- TF / 18478 Programs for Sustainable Posterior Individual Limited 5,093.00 0.00 Cancelado territorial dirigida a 01 08 23 04 18 Landscape Management prevenir deforestación y aportar a la conectividad ecosistémica. Municipio de Miraflores. CO-PNF-20986-CS-INDV / Profesional en SIG - Interpretación de imágenes Component 3 - Sectoral 2017-08- 2017-08- 2017-08- 2017-09- 2017-11- satelitales como insumo TF / 18478 Programs for Sustainable Posterior Individual Limited 5,093.00 0.00 Cancelado 01 08 23 04 18 para el ordenamiento Landscape Management ambiental territorial. Municipio de Miraflores CO-PNF-41772-CS-INDV / Elaboración de diseños Component 3 - Sectoral novedosos de ingeniería 2018-08- 2018-08- 2018-09- 2018-10- 2018-10- 2019-01- 2019-02- TF / 18478 Programs for Sustainable Posterior Individual Limited 8,036.00 11,844.75 Finalizado para pasos de fauna y 23 28 18 23 05 21 28 Landscape Management señalización vial, en red vial de la Amazonia CO-PNF-41771-CS-INDV / Identificación y valoración de impactos, costos y Component 3 - Sectoral 2018-08- 2018-08- 2018-09- 2018-10- 2018-11- 2019-04- 2019-04- beneficios socio- TF / 18478 Programs for Sustainable Posterior Individual Limited 13,393.00 11,842.13 Finalizado 22 27 17 22 16 20 19 económicos de las vías Landscape Management priorizadas en los departamentos del Guaviare, Caquetá y sur del Meta. CO-PNF-41770-CS-INDV / Diseño de indicadores para valoración de impactos de la red vial terciaria, Component 3 - Sectoral 2018-08- 2018-08- 2018-09- 2018-10- 2018-10- 2019-04- 2019-03- formulación de planes de TF / 18478 Programs for Sustainable Posterior Individual Limited 13,393.00 11,907.75 Finalizado 23 28 18 23 08 21 29 mejoramiento de la Landscape Management conectividad e integridad ecosistémicas y diseño de pasos de fauna y señalética en infraestructura verde CO-PNF-41768-CS-INDV / Valoración de impactos de proyectos viales (carreteros Component 3 - Sectoral y fluviales) en la Amazonia 2018-08- 2018-08- 2018-09- 2018-10- 2018-10- 2019-03- 2019-03- TF / 18478 Programs for Sustainable Posterior Individual Limited 13,393.00 11,907.75 Finalizado colombiana, con énfasis en 16 21 11 16 08 15 07 Landscape Management deforestación, cambios de uso, mercado de tierras y economías locales CO-PNF-41767-CS-INDV / Análisis espacial de Component 3 - Sectoral 2018-08- 2018-08- 2018-09- 2018-10- 2018-10- 2019-04- 2019-04- conglomerados viales e TF / 18478 Programs for Sustainable Posterior Individual Limited 16,071.00 10,320.05 Finalizado 23 28 18 23 16 21 26 impactos ambientales y Landscape Management sociales. CO-PNF-41764-CS-INDV / Análisis territorial y ambiental de la inversión pública en vías de segundo Component 3 - Sectoral y tercer orden, realizada 2018-08- 2018-08- 2018-09- 2018-10- 2018-11- 2019-04- 2019-04- TF / 18478 Programs for Sustainable Posterior Individual Limited 8,036.00 11,842.13 Finalizado por la nación, el 22 27 17 22 15 20 30 Landscape Management departamento y los municipios, en el sur del Meta y el Departamento del Caquetá, en el periodo 2014-2020 CO-PNF-64186-CS-INDV / Liderar la continuidad en la operación del componente de monitoreo del carbono del SMBYC, que permita la Component 2 - Forest 2018-07- 2018-07- 2018-08- 2018-08- 2019-01- generación de información TF / 18478 Governance, Management Posterior Individual Limited 19,286.00 0.00 Cancelado 12 17 01 26 26 temática de monitoreo de and Monitoring los bosques, estimaciones de contenidos y flujos de carbono y estimaciones de emisiones producto de CO-PNF-41753-CS-INDV / Diseño y aplicación de una metodología homologada para realizar los estudio de Component 3 - Sectoral conectividad ecológica el 2017-12- 2018-01- 2018-01- 2018-02- 2018-08- TF / 18478 Programs for Sustainable Posterior Individual Limited 17,143.00 0.00 Cancelado paisaje (tanto estructural 29 03 24 28 27 Landscape Management como funcional) en tres ámbitos de alcance: regional (Amazonía colombiana), subregional y local. CO-PNF-41754-CS-INDV / Caracterización sociocultural de los motores, agentes, causas Component 3 - Sectoral 2017-12- 2018-01- 2018-01- 2018-02- 2018-06- directas y causas TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 0.00 Cancelado 29 03 24 28 28 subyacentes de Landscape Management fragmentación de la conectividad ecosistémica, a nivel regional, e identificar oportunidades par CO-PNF-41743-CS-INDV / Realizar la interlocución con las comunidades indígenas, establecer mecanismos de Component 2 - Forest relacionamiento y realizar 2017-12- 2018-01- 2018-01- 2018-02- 2018-07- TF / 18478 Governance, Management Posterior Individual Limited 5,357.00 0.00 Cancelado el acompañamiento en 29 13 20 17 17 and Monitoring campo para el desarrollo de las investigaciones locales que darán los insumos para los diplomados CO-PNF-41757-CS-INDV / Caracterización biofísica de Component 3 - Sectoral los motores de 2017-12- 2018-01- 2018-01- 2018-02- 2018-06- TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 0.00 Cancelado fragmentación, agentes, 29 03 24 28 28 Landscape Management causas directas y énfasis en causas subyacentes, a nivel regional. CO-PNF-41766-CS-INDV / Análisis jurídico de los proyectos de Component 3 - Sectoral construcción,mantenimient 2018-01- 2018-02- 2018-02- 2018-04- 2018-09- TF / 18478 Programs for Sustainable Posterior Individual Limited 8,036.00 0.00 Cancelado o y recuperación y de lso 31 05 26 02 29 Landscape Management procedimientos de licenciamiento de proyectos viales CO-PNF-41758-CS-INDV / Control de calidad de la interpretación de coberturas de la tierra, de las áreas priorizadas por la Component 3 - Sectoral 2017-12- 2018-01- 2018-01- 2018-02- 2018-06- Mesa Técnica Ambiental TF / 18478 Programs for Sustainable Posterior Individual Limited 10,714.00 0.00 Cancelado 29 03 24 28 28 para la Formulación de Landscape Management Recomendaciones sobre Infraestructura y Actividades Sectoriales en la Amazonia, de acuerdo con los protocolos CO-PNF-62962-CS-INDV / Estructurar un Manual Operativo que establezca la gobernanza, procesos y Component 1 - Protected procedimientos de HECO, 2018-10- 2018-10- 2018-10- 2018-11- 2019-02- TF / 18478 Areas Management and Posterior Individual Limited 21,429.00 0.00 Cancelado con base en las condiciones 01 06 20 10 08 Financial Sustainability de desembolso, metas e indicadores de desempeño acordados entre los actores de HECO. CO-PNF-75459-CS-CDS / Profesional para la Component 2 - Forest generación de la versión 1.0 Selección directa 2018-09- 2018-09- 2018-11- 2018-09- 2019-01- 2019-12- TF / 18478 Governance, Management Posterior Direct 7,500.00 6,785.10 Finalizado del mapa actualizado de de consultores 20 30 01 14 31 30 and Monitoring coberturas de la tierra a escala 1:1000.000 - IDEAM - JAVIER ESPEJO CO-PNF-75469-CS-INDV / Prestar los servicios Component 2 - Forest profesionales para realizar 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- 2019-03- TF / 18478 Governance, Management Posterior Individual Limited 4,821.00 3,890.57 Finalizado la actualización de 20 18 25 30 10 15 01 15 31 14 and Monitoring coberturas de la tierra a escala 1:100.000 para la región de la Amazonia, CO-PNF-75474-CS-INDV / Intérprete para el análisis multitemporal de accesos terrestres, asentamientos, pistas y aeropuertos en Component 2 - Forest 2018-09- 2019-03- 2018-09- 2019-03- 2018-10- 2019-04- 2018-11- 2019-04- 2019-02- 2019-11- áreas seleccionadas TF / 18478 Governance, Management Posterior Individual Limited 6,429.00 7,461.27 Finalizado 20 11 25 13 10 22 01 22 28 28 complementarias de los and Monitoring departamentos de Caquetá, Sur del Meta, Guaviare, Putumayo, Amazonas, Vaupés y Guainía IDEAM CO-PNF-75479-CS-INDV / Diseñar y diagramar los contenidos visuales y las Component 4 - Project piezas de comunicación y Coordination, 2018-09- 2018-09- 2018-10- 2018-11- 2018-10- 2019-10- 2019-10- divulgación que se TF / 18478 Posterior Individual Limited 17,143.00 15,241.92 Finalizado Management, Monitoring 20 25 12 01 16 31 14 requieran para presentar and Evaluation (M&E) los informes y resultados que se generen en la implementación del Proyecto. Page 7 CO-PNF-81059-CS-INDV / Formular un plan de acción para la implementación del Sistema de Información de Seguimiento Ambiental SISA Component 2 - Forest 2018-10- 2019-05- 2018-10- 2018-12- 2018-11- 2019-01- 2018-12- 2019-01- 2019-01- 2019-03- en CDA, con base en el TF / 18478 Governance, Management Posterior Individual Limited 3,571.00 2,907.20 Finalizado 25 20 30 20 14 25 03 25 03 18 diagnóstico de la and Monitoring infraestructura tecnológica y de los procedimientos de gestión de la información de la entidad CO-PNF-81061-CS-INDV / Lineamientos de política pública ambiental para la actualización de los Component 2 - Forest 2018-10- 2018-10- 2018-11- 2018-12- 2018-11- 2019-03- 2019-02- instrumentos de TF / 18478 Governance, Management Posterior Individual Limited 9,643.00 9,947.39 Finalizado 25 30 13 05 15 05 14 ordenamiento territorial, en and Monitoring cumplimiento en cumplimiento de la sentencia 4360 de 2018. CO-PNF-81066-CS-INDV / Elaboración de guión, toma Component 2 - Forest 2018-10- 2018-10- 2018-10- 2018-11- 2018-11- 2019-01- 2018-12- 2019-03- 2019-01- 2019-03- de imágenes y edición un TF / 18478 Governance, Management Posterior Individual Limited 2,857.00 2,300.80 Finalizado 25 04 30 15 15 18 13 01 14 31 video sobre gestión de and Monitoring conocimiento de los bosques CO-PNF-81062-CS-INDV / Consolidación y actualización del PBOT de Component 2 - Forest San José del Guaviare, de 2018-11- 2018-12- 2018-11- 2018-04- 2018-12- 2018-12- 2018-12- 2018-12- 2019-07- 2019-06- TF / 18478 Governance, Management Posterior Individual Direct 8,750.00 7,130.73 Finalizado conformidad con los 14 03 24 16 05 12 24 12 22 30 and Monitoring lineamiento definidos por el MADS para el cumplimiento de la STC 4360 de 2018. Deyanira Vanegas CO-PNF-81064-CS-INDV / Sistematización de la implementación y los Component 2 - Forest 2018-11- 2019-04- 2018-11- 2019-04- 2018-12- 2019-04- 2018-12- 2019-04- 2019-02- 2019-11- resultados de los Planes de TF / 18478 Governance, Management Posterior Individual Direct 3,786.00 6,218.06 Finalizado 13 05 23 08 04 24 24 24 24 11 Pueblos Indígenas- and Monitoring KATTERINE BETANCOURT GARCÍA CO-PNF-85473-CS-INDV / Revisión y conceptualización de los Component 2 - Forest planes de ordenamiento 2018-11- 2018-09- 2018-11- 2019-03- 2018-12- 2019-04- 2019-01- 2019-04- 2019-06- 2020-03- TF / 18478 Governance, Management Posterior Individual Limited 16,071.00 16,509.36 Finalizado territorial (Departamental y 22 11 27 12 18 17 22 17 21 30 and Monitoring municipales), en la etapa de concertación entre la CDA, alcaldias y gobernación del Guavaire. CO-PNF-89582-CS-INDV / Component 4 - Project Coordinación general del Coordination, 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-01- 2018-12- 2019-12- 2019-05- TF / 18478 Posterior Individual Direct 61,329.00 50,693.46 Finalizado proyecto- 2019. Doris Management, Monitoring 14 04 24 07 27 31 02 31 31 27 Ochoa Jaramillo - Miembro and Evaluation (M&E) UCP CO-PNF-89585-CS-INDV / Component 4 - Project Profesional de seguimiento Coordination, 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-01- 2018-12- 2019-12- 2019-06- y monitoreo- 2019. Luz TF / 18478 Posterior Individual Direct 44,209.00 36,318.29 Finalizado Management, Monitoring 14 04 24 04 27 31 02 31 31 28 Adriana Rodriguez Porras - and Evaluation (M&E) Miembro UCP CO-PNF-89586-CS-INDV / Component 4 - Project Especialista financiera- Coordination, 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-01- 2018-12- 2019-12- 2019-12- TF / 18478 Posterior Individual Direct 33,958.00 29,709.75 Finalizado 2019. Doris Fajardo Management, Monitoring 14 04 24 09 27 31 02 31 31 31 Rodriguez - Miembro UCP and Evaluation (M&E) CO-PNF-89587-CS-INDV / Component 4 - Project Especialista de Coordination, 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-01- 2018-12- 2019-12- 2019-04- TF / 18478 Posterior Individual Direct 45,429.00 36,979.58 Finalizado Adquisiciones - 2019. Management, Monitoring 14 04 24 09 27 31 02 31 31 10 Fredy Mojica - Miembro and Evaluation (M&E) UCP CO-PNF-89588-CS-INDV / Consultoría jurídica y gestión interinstitucional de apoyo a los procesos que Component 3 - Sectoral 2018-12- 2018-10- 2018-12- 2018-10- 2018-12- 2019-01- 2019-01- 2019-01- 2019-07- 2020-02- requieran las entidades TF / 18478 Programs for Sustainable Posterior Individual Direct 22,714.00 37,183.53 Finalizado 14 04 24 05 27 28 02 28 01 27 SINA en el cumplimiento de Landscape Management la Sentencia y concreción de acuerdos sectoriales. Eugenia Ponce de León - Miembro UCP CO-PNF-89589-CS-INDV / Profesional de Enlace DTAM Component 3 - Sectoral 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-01- 2019-01- 2019-12- 2019-12- - 5 áreas protegidas. Maria TF / A5789 Programs for Sustainable Posterior Individual Direct 36,429.00 29,659.56 Finalizado 14 04 24 11 27 31 02 02 31 30 Cristina Pacheco - Miembro Landscape Management UCP CO-PNF-89590-CS-INDV / Profesional de apoyo para la implementación de Component 3 - Sectoral 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-01- 2018-12- 2019-12- 2019-12- acuerdos con el sector de TF / A5789 Programs for Sustainable Posterior Individual Direct 34,998.00 28,933.76 Finalizado 14 04 24 13 27 31 02 31 31 30 infraestructura vial. Camilo Landscape Management Rodríguez Pava - Miembro UCP CO-PNF-89591-CS-INDV / Profesional que coordine y oriente la implementación de los acuerdos de Component 3 - Sectoral 2018-12- 2018-11- 2018-12- 2018-11- 2018-12- 2018-12- 2019-01- 2019-01- 2019-12- 2019-12- conservación, restauración TF / 18478 Programs for Sustainable Posterior Individual Direct 23,571.00 18,981.60 Finalizado 14 30 24 30 27 31 02 02 31 31 y no deforestación en las Landscape Management áreas de intervención priorizadas por la CDA. Gina Fernanda Vera - Miembro UCP CO-PNF-89592-CS-INDV / Profesional Especializado Component 1 - Protected Áreas Protegidas de enlace 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-01- 2018-12- 2019-12- 2019-12- TF / A5789 Areas Management and Posterior Individual Direct 24,304.00 20,103.24 Finalizado CDA - Mesa 14 04 24 05 27 31 02 31 31 31 Financial Sustainability Interinstitucional - Comunidades Guaviare. Arelis Arciniegas. CO-PNF-89593-CS-INDV / Profesional para el acompañamiento a los Component 3 - Sectoral resguardos indígenas en el 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-01- 2018-12- 2019-06- 2019-05- TF / A5789 Programs for Sustainable Posterior Individual Direct 9,464.00 7,823.07 Finalizado manejo y sistematización 14 19 24 20 27 31 02 31 01 31 Landscape Management de las iniciativas de Chagras que desarrollen los grupos de mujeres. Katterine Betancourt. CO-PNF-89594-CS-INDV / Component 2 - Forest Profesional apoyo plan de 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-01- 2018-12- 2019-04- 2019-06- TF / 18478 Governance, Management Posterior Individual Direct 4,543.00 7,070.93 Finalizado manejo resguardos del 14 19 24 19 27 31 02 31 01 30 and Monitoring medio Caquetá. Erick López Vanegas CO-PNF-89595-CS-INDV / Líder junior en Component 2 - Forest procesamiento digital para 2018-12- 2018-11- 2018-12- 2018-11- 2018-12- 2018-12- 2019-01- 2018-12- 2019-12- 2019-12- TF / 18478 Governance, Management Posterior Individual Direct 28,114.00 23,097.24 Finalizado capacitación y transferencia 14 19 24 21 27 31 02 31 31 30 and Monitoring del SMBYC a autoridades ambientales - 2019. Juan Carlos Rubiano. CO-PNF-89596-CS-INDV / Profesional especializado en sistema de información geográfica, sensores Component 2 - Forest 2018-12- 2017-12- 2018-12- 2017-12- 2018-12- 2018-01- 2019-01- 2018-01- 2019-12- 2018-12- remotos / monitoreo de TF / 18478 Governance, Management Posterior Individual Direct 45,171.00 34,664.44 Finalizado 14 07 24 12 27 02 02 02 31 19 recursos naturales que and Monitoring lidera el procesamiento digital de imágenes - 2019. Gustavo Galindo CO-PNF-89597-CS-INDV / Component 2 - Forest Experto en Monitoreo, 2018-12- 2018-11- 2018-12- 2018-11- 2018-12- 2018-12- 2019-01- 2018-12- 2019-12- 2019-12- TF / 18478 Governance, Management Posterior Individual Direct 39,000.00 32,040.37 Finalizado Reporte y Verificación - 14 19 24 20 27 31 02 31 31 31 and Monitoring MVR -2019. José Julian González CO-PNF-89598-CS-INDV / Profesional especializado en SIG, sensores remotos, y Component 2 - Forest monitoreo de recursos 2018-12- 2018-11- 2018-12- 2018-12- 2019-01- 2018-12- 2019-12- 2019-12- TF / 18478 Governance, Management Posterior Individual Direct 33,986.00 30,806.15 Finalizado naturales encargados en 14 19 24 27 02 31 31 31 and Monitoring control Temático de Calidad - SYMBC- 2019. Katherine Vergara CO-PNF-89599-CS-INDV / Profesional en Manejo de Component 2 - Forest Sistemas de Información 2018-12- 2018-11- 2018-12- 2018-12- 2019-01- 2018-12- 2019-12- 2019-12- TF / 18478 Governance, Management Posterior Individual Direct 23,829.00 21,599.27 Finalizado que Genere las Alertas 14 19 24 27 02 31 31 31 and Monitoring Tempranas de Deforestación - PDI 1 - 2019. Cristian Forero. CO-PNF-89600-CS-INDV / Profesional en Manejo de Component 2 - Forest Sistemas de Información 2018-12- 2018-11- 2018-12- 2018-12- 2019-01- 2018-12- 2019-12- 2019-12- TF / 18478 Governance, Management Posterior Individual Direct 23,829.00 21,599.27 Finalizado que Genere las Alertas 14 19 24 27 02 31 31 31 and Monitoring Tempranas de Deforestación - PDI 2 - 2019. Diana Lara. Component 4 - Project CO-PNF-89777-CS-INDV / Coordination, 2018-12- 2018-12- 2019-01- 2019-01- 2020-01- Profesional apoyo TF / 18478 Posterior Individual Limited 21,429.00 0.00 Cancelado Management, Monitoring 14 19 08 16 15 adquisiciones and Evaluation (M&E) CO-PNF-89782-CS-INDV / Profesional apoyo a la Component 3 - Sectoral 2018-12- 2019-02- 2018-12- 2019-03- 2019-01- 2019-03- 2019-02- 2019-03- 2020-01- 2019-12- gestión territorial y de TF / 18478 Programs for Sustainable Posterior Individual Limited 21,429.00 20,931.84 Finalizado 20 20 25 05 08 22 04 22 31 25 seguimiento a la planeación Landscape Management y ejecución operativa regional (Caquetá). CO-PNF-89786-CS-INDV / Profesional que generé información espacial para la Component 3 - Sectoral 2018-12- 2019-03- 2018-12- 2019-03- 2019-01- 2019-03- 2019-02- 2019-03- 2020-01- implementación de los TF / A5789 Programs for Sustainable Posterior Individual Limited 17,143.00 13,954.56 Firmado 20 08 25 11 09 29 04 29 31 acuerdos de conservación, Landscape Management restauración y no deforestación - CAZ CO-PNF-89788-CS-INDV / Profesional para coordinar y facilitar la implementación de los planes de trabajo Component 3 - Sectoral 2018-12- 2018-12- 2018-12- 2018-12- 2019-01- 2019-02- 2019-02- 2019-02- 2020-01- 2020-04- definidos con los TF / A5789 Programs for Sustainable Posterior Individual Limited 27,636.00 25,245.44 Finalizado 20 04 25 04 09 11 04 13 31 06 resguardos Indígenas Landscape Management vecinos del PNNSCH y los que suscribieron los acuerdos de voluntades con el PNN La Paya. CO-PNF-89790-CS-INDV / Profesional para realizar el Component 1 - Protected 2018-12- 2019-03- 2018-12- 2019-03- 2019-01- 2019-04- 2019-02- 2019-04- 2020-01- 2019-06- enlace técnico para la TF / A5789 Areas Management and Posterior Individual Limited 15,714.00 12,654.40 Finalizado 20 05 25 21 09 17 04 17 02 25 gestión comunitaria del APR Financial Sustainability Bajo Caguán CO-PNF-89793-CS-INDV / Profesional Apoyo proceso Component 1 - Protected formulación de plan de 2018-12- 2018-07- 2018-12- 2018-09- 2019-01- 2019-03- 2019-02- 2018-10- 2020-01- 2019-03- TF / A5789 Areas Management and Posterior Individual Limited 21,429.00 17,604.60 Finalizado manejo de la nueva APR 20 19 25 12 10 22 04 16 31 22 Financial Sustainability Páramo de Miraflores - Picachos CO-PNF-99123-CS-INDV / Coordinar el proceso de asesoría técnica a municipios, gobernaciones, Component 3 - Sectoral CDS y organizaciones de 2019-02- 2019-01- 2019-02- 2019-02- 2019-03- 2019-03- 2019-03- 2019-03- 2020-01- 2020-04- TF / 18478 Programs for Sustainable Posterior Individual Limited 25,807.00 27,172.48 Finalizado apoyo, para llevar a término 18 31 23 22 07 18 20 18 15 19 Landscape Management el ajuste excepcional de los POT, de conformidad con lo ordenado en la Sentencia STC 4360-2018. CO-PNF-99124-CS-INDV / Diseñar e implementar la estrategia de coordinación y concertación con las Component 3 - Sectoral autoridades territoriales, 2019-02- 2019-01- 2019-02- 2019-02- 2019-03- 2019-03- 2019-03- 2019-03- 2020-01- 2020-03- TF / 18478 Programs for Sustainable Posterior Individual Direct 25,807.00 27,547.68 Finalizado sectoriales y ambientales, 18 31 28 06 12 12 20 12 20 25 Landscape Management para el ajuste excepcional de los POT de 15 municipios de la Amazonia colombiana. César Augusto Rey Angel CO-PNF-99126-CS-INDV / Profesional Especializado que Lidere el proceso de comunicación y gestión del Component 4 - Project conocimiento de la Coordination, 2019-02- 2019-01- 2019-02- 2019-02- 2019-03- 2019-02- 2019-03- 2019-02- 2020-03- 2020-03- TF / 18478 Posterior Individual Direct 34,839.00 31,904.28 Finalizado Iniciativa GEF Corazón de la Management, Monitoring 18 25 28 06 12 27 18 27 17 30 Amazonia, entre las and Evaluation (M&E) entidades socias y actores interesados a nivel nacional y regional . Marcela Rodríguez Salguero CO-PNF-99128-CS-INDV / Diseñar y desarrollar los contenidos gráficos Component 4 - Project multiformato requeridos Coordination, 2019-02- 2019-01- 2019-02- 2019-02- 2019-03- 2019-02- 2019-03- 2019-02- 2020-03- para la implementación de TF / 18478 Posterior Individual Direct 30,968.00 28,167.36 Firmado Management, Monitoring 18 25 28 12 12 27 21 27 20 la Estrategia de and Evaluation (M&E) comunicaciones y gestión del conocimiento de la Iniciativa.. Andrés Urquina Sánchez CO-PNF-99135-CS-INDV / Prestar sus servicios profesionales para apoyar la ejecución de los procesos Component 4 - Project de adquisiciones y Coordination, 2019-02- 2019-01- 2019-02- 2019-03- 2019-02- 2019-03- 2019-02- 2020-02- 2019-06- contrataciones que se TF / 18478 Posterior Individual Direct 23,226.00 22,889.52 Finalizado Management, Monitoring 15 21 21 01 12 01 14 29 28 requieran de acuerdo con lo and Evaluation (M&E) establecido en el Acuerdo Legal de Donación, el Manual Operativo del Proyecto, el Plan de Adquisiciones y las CO-PNF-99138-CS-INDV / Formular recomendaciones respecto de las acciones prioritarias para la prevención y la mitigación Component 3 - Sectoral 2019-02- 2019-01- 2019-02- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-06- 2019-12- de impactos de los TF / 18478 Programs for Sustainable Posterior Individual Limited 10,000.00 12,744.34 Finalizado 15 24 20 01 05 18 15 18 30 30 proyectos de infraestructura Landscape Management de transporte (vial y fluvial), con base en la parametrización de modelos de deforestación en áreas seleccion CO-PNF-103416-CS-INDV / Gestionar información y aportar criterios y documentos técnicos para la incorporación del manejo Component 3 - Sectoral 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- 2019-04- 2019-10- 2019-12- forestal sostenible y la TF / 18478 Programs for Sustainable Posterior Individual Limited 11,613.00 10,465.92 Finalizado 15 21 20 21 03 22 10 22 07 18 ordenación forestal de las Landscape Management Corporaciones en los POT de los 15 municipios citados por la Corte en la Sentencia STC 4360. Page 8 CO-PNF-103421-CS-INDV / Generar y procesar información para análisis asociados a la variabilidad y Component 3 - Sectoral 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-04- 2019-05- 2019-04- 2019-10- 2019-07- adaptación al cambio TF / 18478 Programs for Sustainable Posterior Individual Limited 13,548.00 12,184.62 Finalizado 15 21 20 22 03 22 01 22 28 16 climático para los 15 Landscape Management municipios citados de manera expresa por la Corte en la Sentencia STC 4360. CO-PNF-103492-CS-INDV / Gestionar información y aportar criterios y documentos técnicos asociados a la Component 3 - Sectoral consolidacion y manejo de 2019-03- 2019-04- 2019-03- 2019-04- 2019-04- 2019-05- 2019-04- 2019-05- 2019-08- 2020-04- TF / 18478 Programs for Sustainable Posterior Individual Limited 11,613.00 13,605.84 Finalizado la estructura ecológica 15 15 20 15 03 08 15 08 14 21 Landscape Management principal, manejo adecuado del suelo, restauración y uso de la biodiversidad, para incorporarlos en los POT de los 15 municipi CO-PNF-103503-CS-INDV / Profesional que generé información espacial para la Component 3 - Sectoral 2019-04- 2019-07- 2019-04- 2019-07- 2019-04- 2019-07- 2019-05- 2019-07- 2020-01- implementación de los TF / A5789 Programs for Sustainable Posterior Individual Limited 13,065.00 11,561.20 Firmado 01 11 06 11 19 29 03 29 31 acuerdos de conservación, Landscape Management restauración y no deforestación CO-PNF-113781-CS-INDV / Profesional que oriente técnicamente los procesos de coordinación institucional y concertación Component 3 - Sectoral 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-05- 2020-06- 2020-06- social necesarios para el TF / A5789 Programs for Sustainable Posterior Individual Limited 27,097.00 24,369.24 Finalizado 13 31 21 31 31 14 07 14 06 30 establecimiento y Landscape Management mantenimiento de los acuerdos de conservación, restauración y no deforestación, en las áreas definidas por CORPOAMAZ CO-PNF-118099-CS-CDS / Profesional de apoyo CORPOAMAZONIA para la Component 3 - Sectoral Selección directa 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-07- 2020-01- 2020-01- incorporación de criterios TF / A5789 Programs for Sustainable Posterior Direct 9,232.00 8,322.12 Finalizado de consultores 10 21 20 28 23 23 19 24 ambientales para proyectos Landscape Management de red vial terciarias- Jairo Cárdenas CO-PNF-118100-CS-CDS / Profesional de apoyo CDA Component 3 - Sectoral para la incorporación de Selección directa 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-07- 2020-01- 2020-01- TF / A5789 Programs for Sustainable Posterior Direct 9,232.00 8,272.04 Finalizado criterios ambientales para de consultores 10 21 20 28 19 19 15 24 Landscape Management proyectos de red vial terciarias. - Enrique Caballero CO-PNF-118102-CS-CDS Component 4 - Project / Coordinación General del Coordination, Selección directa 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-07- 2020-07- 2020-01- TF / A5789 Posterior Direct 54,194.00 21,330.41 Finalizado proyecto - Luz Adriana Management, Monitoring de consultores 07 17 17 20 17 02 15 09 Rodríguez and Evaluation (M&E) CO-PNF-118103-CS-CDS Component 4 - Project / Especialista de Coordination, Selección directa 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-07- 2020-07- 2020-07- TF / A5789 Posterior Direct 34,839.00 31,215.24 Finalizado adquisiciones- Viviana Management, Monitoring de consultores 07 21 17 27 17 02 15 08 Sánchez Quintero and Evaluation (M&E) CO-PNF-118104-CS-INDV / Orientar los procesos de planificación, ordenamiento Component 3 - Sectoral y gestión de turismo de 2019-06- 2019-10- 2019-06- 2019-10- 2019-07- 2019-10- 2019-07- 2019-10- 2020-07- 2020-11- TF / A5789 Programs for Sustainable Posterior Individual Limited 17,419.00 11,817.90 Finalizado naturaleza en las áreas 14 03 19 11 03 30 19 30 17 26 Landscape Management seleccionadas de la jurisdicción de la CDA, Guaviare CO-PNF-118105-CS-INDV Component 4 - Project / Profesional de Coordination, 2019-06- 2019-09- 2019-06- 2019-09- 2019-07- 2019-10- 2019-07- 2019-10- 2020-07- 2020-11- TF / A5789 Posterior Individual Limited 38,710.00 32,408.64 Finalizado seguimiento, monitoreo y Management, Monitoring 14 16 19 18 03 30 19 30 17 26 evaluación del proyecto and Evaluation (M&E) CO-PNF-113782-CS-CDS / AUDITORIA EXTERNA DEL PROYECTO "CONSERVACIÓN Component 4 - Project DE BOSQUES Y Coordination, Selección directa 2019-06- 2019-04- 2019-07- 2019-08- 2019-08- 2019-09- 2020-02- 2019-12- SOSTENIBILIDAD EN EL TF / A5789 Posterior Direct 28,525.00 13,016.08 Finalizado Management, Monitoring de consultores 03 03 24 02 08 03 04 18 CORAZÓN DE LA and Evaluation (M&E) AMAZONIA" BAJO EL (P144271- TF018478) Y FINANCIACIÓN ADICIONAL (P158003-TF0A5789) CO-PNF-123107-CS-INDV / Realizar la sustentación técnica y apoyo del proceso de construcción y validación Component 1 - Protected 2019-07- 2019-07- 2019-07- 2019-07- 2019-08- 2019-07- 2019-08- 2019-08- 2019-12- 2019-12- social e institucional para TF / A5789 Areas Management and Posterior Individual Limited 7,742.00 4,682.29 Finalizado 26 29 31 30 14 29 28 26 27 14 la declaratoria de la nueva Financial Sustainability área protegida regional en el de departamento del Guaviare en Jurisdicción de la CDA. CO-PNF-123080-CS-CDS / Coordinar la revisión y ajuste del esquema de ordenamiento del municipio de Miraflores en todos sus Component 3 - Sectoral Selección directa 2019-07- 2019-07- 2019-08- 2019-08- 2019-08- 2019-09- 2019-11- 2019-12- componentes conforme con TF / A5789 Programs for Sustainable Posterior Direct 6,774.00 6,503.18 Finalizado de consultores 26 18 05 08 26 09 22 31 los lineamientos nacionales Landscape Management (MADS), departamentales y determinantes ambientales de la CDA para el cumplimiento de la STC 4360/2018 CO-PNF-123079-CS-CDS / Profesional que sistematice la experiencia y Component 4 - Project documente la Coordination, Selección directa 2019-07- 2019-08- 2019-08- 2019-08- 2019-08- 2019-08- 2020-08- 2020-08- implementación del TF / A5789 Posterior Direct 21,290.00 19,075.98 Finalizado Management, Monitoring de consultores 26 05 05 12 26 29 25 28 proyecto GEF Corazón de la and Evaluation (M&E) Amazonia y realice seguimiento a la aplicación de los instrumentos de salvaguardas sociales. CO-PNF-130031-CS-INDV / Actualizar el componente ambiental del PDS de la ZRC Component 3 - Sectoral 2019-09- 2019-10- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2020-04- cuenca del río Pato y valle TF / A5789 Programs for Sustainable Posterior Individual Limited 7,742.00 10,350.72 Firmado 20 15 27 15 11 18 25 08 22 de Balsillas, y actualización Landscape Management del estudio de sustracción del Bajo Pato. CO-PNF-130033-CS-INDV / Generar la base cartográfica para la a actualización del Plan de Component 3 - Sectoral Desarrollo Sostenible (PDS) 2019-09- 2019-10- 2019-09- 2019-10- 2019-10- 2019-11- 2019-10- 2019-11- 2020-04- 2020-12- TF / A5789 Programs for Sustainable Posterior Individual Limited 7,742.00 10,045.20 Finalizado de la zona de Reserva 20 15 27 29 11 15 25 15 22 17 Landscape Management Campesina (ZRC) cuenca del Río Pato y Valle de Balsillas, precisión de límites y ampliación de la zona del bajo Pato y el estudio para sustr CO-PNF-130035-CS-INDV / Actualizar el componente socioeconómico del PDS de Component 3 - Sectoral 2019-09- 2019-09- 2019-09- 2019-09- 2019-10- 2019-11- 2019-10- 2019-11- 2020-02- la ZRC de la cuenca del río TF / A5789 Programs for Sustainable Posterior Individual Limited 5,161.00 4,555.04 Firmado 20 19 27 20 11 08 25 08 21 Pato y Valle de Balsillas, y Landscape Management actualización del estudio de sustracción del Bajo Pato. CO-PNF-130038-CS-CDS / Elaborar la cartilla marco de referencia para la toma de decisiones para la implementación de pasos Component 3 - Sectoral Selección directa 2019-09- 2019-08- 2019-09- 2019-09- 2019-10- 2020-01- 2020-01- 2020-07- de fauna en proyectos de TF / A5789 Programs for Sustainable Posterior Direct 7,258.00 6,644.03 Finalizado de consultores 20 28 30 26 21 09 17 17 infraestructura carretera Landscape Management existentes o proyectados en la región amazónica y proveer criterios económicos para la incorporación de CO-PNF-123077-CS-CDS / Apoyar técnicamente la concertación y formalización de acuerdos en Áreas y temas de Interés Component 3 - Sectoral Selección directa 2019-09- 2019-09- 2019-09- 2019-09- 2019-10- 2019-10- 2020-04- 2020-05- común con los resguardos TF / A5789 Programs for Sustainable Posterior Direct 11,613.00 10,663.20 Finalizado de consultores 20 12 30 18 21 16 20 22 colindantes al Parque Landscape Management Nacional Serranía de Chiribiquete que contribuyan al mejoramiento de la gobernanza ambiental del territorio. CO-PNF-130041-CS-INDV / Apoyar técnicamente a las autoridades indígenas de los resguardos de Andoque de Aduche, Miriti-Paraná, Component 3 - Sectoral 2019-09- 2019-10- 2019-09- 2019-10- 2019-10- 2019-11- 2019-10- 2019-11- 2020-02- 2020-03- Monochoa ,Puerto Zábalo TF / A5789 Programs for Sustainable Posterior Individual Limited 6,452.00 5,805.60 Finalizado 20 03 27 29 11 15 25 15 21 27 los Monos y Nonuya de Landscape Management Villazul en el proceso de incorporación de las áreas de interés común, en los planes culturales de manejo CO-PNF-130032-CS-INDV / Realizar propuesta de ordenamiento productivo y actualización del Component 3 - Sectoral 2019-09- 2019-09- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2020-04- 2020-12- componente productivo del TF / A5789 Programs for Sustainable Posterior Individual Limited 7,742.00 10,062.48 Finalizado 20 19 27 01 11 25 25 25 22 18 PDS de la ZRC cuenca del Landscape Management río Pato y valle de Balsillas, y actualización del estudio de sustracción del Bajo Pato. CO-PNF-130030-CS-INDV / Coordinar el proceso de actualización del Plan de Desarrollo Sostenible de la Component 3 - Sectoral Zona de Reserva Campesina 2019-09- 2019-09- 2019-09- 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2020-05- 2020-12- TF / A5789 Programs for Sustainable Posterior Individual Limited 11,290.00 14,638.85 Finalizado cuenca del río Pato y Valle 20 20 27 20 11 30 25 30 25 21 Landscape Management de Balsillas, la precisión de límites, y actualización del estudio de sustracción del Bajo Pato. CO-PNF-134080-CS-CDS / Prestar sus servicios profesionales para apoyar la ejecución de los procesos Component 4 - Project de adquisiciones y Coordination, Selección directa 2019-09- 2019-09- 2019-09- 2019-09- 2019-10- 2019-09- 2020-10- 2020-10- contrataciones que se TF / A5789 Posterior Direct 20,516.00 18,804.61 Finalizado Management, Monitoring de consultores 20 11 30 11 23 25 22 07 requieran de acuerdo con lo and Evaluation (M&E) establecido en el Acuerdo Legal de Donación, el Manual Operativo del Proyecto, el Plan de Adquisiciones y las CO-PNF-81085-CS-INDV / Planificación, ordenamiento Component 3 - Sectoral y gestión del turismo de 2019-06- 2019-06- 2019-07- 2019-07- 2020-06- TF / A5789 Programs for Sustainable Posterior Individual Limited 17,679.00 0.00 Cancelado naturaleza, en áreas 14 19 05 26 19 Landscape Management seleccionadas de la jurisdicción de CDA. CO-PNF-99131-CS-INDV / Experto que facilite los talleres que se definan con Component 3 - Sectoral 2019-02- 2019-02- 2019-03- 2019-03- 2020-01- ATICOYA, en aspectos TF / A5789 Programs for Sustainable Posterior Individual Limited 5,806.00 0.00 Cancelado 18 23 08 20 15 legales y normativos, Landscape Management aprovechamiento de recursos naturales y otros temas CO-PNF-99129-CS-INDV / Experto que facilite los talleres que se definan con Component 3 - Sectoral 2019-02- 2019-02- 2019-03- 2019-03- 2020-01- la Mesa Ramsar EFI en TF / A5789 Programs for Sustainable Posterior Individual Limited 3,629.00 0.00 Cancelado 18 23 08 20 17 aspectos legales y Landscape Management normativos, aprovechamiento de recursos naturales y otros temas CO-PNF-96464-CS-INDV / Profesional que realice los estudios técnicos para la Component 1 - Protected declaración de reservas 2019-02- 2019-02- 2019-03- 2019-03- 2019-09- TF / A5789 Areas Management and Posterior Individual Limited 9,677.00 0.00 Cancelado naturales de la sociedad 15 20 01 08 04 Financial Sustainability civil en el área de amortiguamiento del APR Páramo de Mirafores Picachos CO-PNF-109350-CS-INDV Component 3 - Sectoral / Diseño participativo de 2019-04- 2019-05- 2019-05- 2019-06- 2019-09- TF / 18478 Programs for Sustainable Posterior Individual Open 4,839.00 0.00 Cancelado una estrategia de 25 14 28 14 11 Landscape Management comunicaciones para ASOCAPRICHO Component 4 - Project CO-PNF-109352-CS-INDV Coordination, 2019-04- 2019-05- 2019-06- 2019-07- 2020-03- / Especialista de TF / 18478 Posterior Individual Open 27,355.00 0.00 Cancelado Management, Monitoring 25 29 19 10 03 Adquisiciones - 2019 and Evaluation (M&E) CO-PNF-96466-CS-INDV / Profesional que incorporé los lineamientos de OT del MADS, la CDA y Gobernación del Guaviare, Component 3 - Sectoral 2019-01- 2019-02- 2019-02- 2019-03- 2019-06- en los OT municipales de TF / 18478 Programs for Sustainable Posterior Individual Limited 13,548.00 0.00 Cancelado 29 03 18 01 30 Retorno, Calamar, Landscape Management Miraflores y Depto del Guaviare y complemente planes de acción con acciones de mitigación al cc y control a la defores CO-PNF-96467-CS-INDV / Profesional que incorporé los ajustes cartográficos en los OT municipales de Component 3 - Sectoral Retorno, Calamar, 2019-01- 2019-02- 2019-02- 2019-03- 2019-06- TF / 18478 Programs for Sustainable Posterior Individual Limited 13,548.00 0.00 Cancelado Miraflores y Depto del 29 03 18 01 30 Landscape Management Guaviare y complemente planes de acción con acciones de mitigación al cc y control a la deforestación, en cumplimiento de la Sentencia. CO-PNF-118114-CS-CDS / Consolidación y actualización de los Esquemas de Ordenamiento Territorial de El Retorno, Component 3 - Sectoral Selección directa 2019-06- 2019-06- 2019-07- 2019-12- Calamar y Miraflores, de TF / A5789 Programs for Sustainable Posterior Direct 12,097.00 0.00 Cancelado de consultores 14 24 24 23 conformidad con los Landscape Management lineamientos definidos por el MADS para el cumplimiento de la STC 4360 de 2018 y coordinar con las Alcaldías de El Retorn Page 9 CO-PNF-123084-CS-CDS / Coordinar la revisión y ajuste de los esquemas de ordenamiento de los municipios de El Retorno y Component 3 - Sectoral Calamar y elaborar el Selección directa 2019-07- 2019-08- 2019-08- 2019-11- TF / A5789 Programs for Sustainable Posterior Direct 6,774.00 0.00 Cancelado componente general, de consultores 26 05 26 25 Landscape Management conforme con los lineamientos nacionales (MADS), departamentales y determinantes ambientales de la CDA para el cumpl CO-PNF-123086-CS-CDS / Elaborar la revisión y ajuste del componente rural de los esquemas de ordenamiento de los Component 3 - Sectoral Selección directa 2019-07- 2019-08- 2019-08- 2019-11- municipios de El Retorno y TF / A5789 Programs for Sustainable Posterior Direct 6,290.00 0.00 Cancelado de consultores 26 05 26 25 Calamar conforme con los Landscape Management lineamientos nacionales (MADS), departamentales y determinantes ambientales de la CDA para el cumplimiento de la CO-PNF-123087-CS-CDS / Realizar la compilación, armonización e integración de todos los documentos Component 3 - Sectoral que conforman los Selección directa 2019-07- 2019-08- 2019-08- 2019-11- TF / A5789 Programs for Sustainable Posterior Direct 4,839.00 0.00 Cancelado esquemas de de consultores 26 05 26 21 Landscape Management ordenamiento, EOT (General, urbano y rural) de acuerdo a la norma y redacción requerida para los EOTy los requisitos de la CDA. Leidy Bernal Vargas CO-PNF-123088-CS-CDS / Realizar la revisión y ajuste de los documentos del Plan Departamental de Ordenamiento Territorial - Component 3 - Sectoral Selección directa 2019-07- 2019-08- 2019-08- 2019-10- PDOT, acorde a los TF / A5789 Programs for Sustainable Posterior Direct 4,516.00 0.00 Cancelado de consultores 26 05 26 25 lineamientos nacionales Landscape Management (MADS), departamentales y determinantes ambientales de la CDA para el cumplimiento de la STC 4360/2018 y garan CO-PNF-123091-CS-INDV / Liderar y desarrollar el proceso de construcción y validación social, Component 1 - Protected institucional y técnica a 2019-07- 2019-07- 2019-08- 2019-08- 2020-08- TF / A5789 Areas Management and Posterior Individual Limited 27,097.00 0.00 Cancelado nivel local y regional para la 26 31 15 29 28 Financial Sustainability declaración del APR Bajo Caguán, y oriente las acciones a desarrollar en el PNR Miraflores Picachos, Caquetá. CO-PNF-130037-CS-INDV / Apoyar la incorporación de la información espacial relacionada con la adaptación al cambio Component 3 - Sectoral 2019-09- 2019-09- 2019-10- 2019-10- 2020-02- climático en las TF / A5789 Programs for Sustainable Posterior Individual Limited 5,161.00 0.00 Cancelado 20 27 11 25 21 determinantes ambientales Landscape Management de las corporaciones de la región Amazonía Colombiana, la cual corresponde a 42 subzonas hidrográficas que abarcan los 15 CO-PNF-134917-CS-INDV / Profesional Apoyo Component 1 - Protected proceso formulación de 2018-12- 2019-02- 2018-12- 2019-02- 2019-01- 2019-03- 2019-02- 2019-03- 2019-08- 2020-06- TF / A5789 Areas Management and Posterior Individual Limited 21,429.00 17,691.00 Finalizado plan de manejo de la nueva 20 11 25 21 15 22 19 22 18 26 Financial Sustainability APR Páramo de Miraflores - Picachos CO-PNF-137120-CS-INDV / Profesional para consolidación y reporte de Component 3 - Sectoral información de sistemas 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- 2019-11- 2019-11- 2019-11- 2020-11- 2020-12- TF / A5789 Programs for Sustainable Posterior Individual Limited 13,548.00 11,970.42 Finalizado agroforestales, plantaciones 21 25 29 18 13 25 29 25 27 17 Landscape Management , movilización y aprovechamiento forestal al SNIF (SIAC)- Corpoamazonia CO-PNF-137125-CS-INDV / Realizar la preproduccion, produccion y pos Component 3 - Sectoral produccion de un video en 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- 2019-11- 2019-12- 2019-11- 2020-02- 2020-03- TF / A5789 Programs for Sustainable Posterior Individual Limited 6,452.00 5,708.00 Finalizado formato HD y registro 21 28 28 06 11 25 02 25 03 18 Landscape Management fotografico profesional que de cuenta de los resultados de GEF CA Financiamiento Original CO-PNF-103505-CS-INDV / Diseño de un Sistema integrado de gestión Component 1 - Protected administrativa, financiera y 2019-03- 2019-03- 2019-04- 2019-04- 2019-08- TF / A5789 Areas Management and Posterior Individual Limited 17,419.00 0.00 Cancelado técnica para FPN: 15 29 03 15 14 Financial Sustainability levantamiento de requerimientos internos y externos. CO-PNF-71707-CS-INDV / Estructurar un Manual Operativo que establezca la gobernanza, procesos y Component 1 - Protected procedimientos de HECO, 2018-08- 2018-08- 2018-09- 2018-10- 2019-02- TF / 18478 Areas Management and Posterior Individual Limited 21,429.00 0.00 Cancelado con base en las condiciones 16 21 11 16 28 Financial Sustainability de desembolso, metas e indicadores de desempeño acordados entre los actores de HECO. CO-PNF-62961-CS-INDV / Liderar la implementación de la estrategia de Component 1 - Protected comunicaciones de 2018-07- 2018-07- 2018-08- 2018-08- 2019-07- TF / 18478 Areas Management and Posterior Individual Limited 24,643.00 0.00 Cancelado HERENCIA COLOMBIA como 13 18 01 22 13 Financial Sustainability un factor estratégico al momento de consolidad esta iniciativa de país CO-PNF-78406-CS-INDV / Estudios y documentación Component 1 - Protected 2018-10- 2018-10- 2018-11- 2018-12- 2019-04- técnica de la nueva Área TF / A5789 Areas Management and Posterior Individual Limited 8,571.00 0.00 Cancelado 15 20 10 06 08 Protegida Regional Bajo Financial Sustainability Caguán -CORPOAMAZONIA CO-PNF-41762-CS-INDV / Diseñar una estrategia de comunicación lúdico- pedagógica y desarrollar Component 3 - Sectoral 2018-07- 2018-07- 2018-08- 2018-09- 2018-12- herramientas audiovisuales TF / 18478 Programs for Sustainable Posterior Individual Limited 5,357.00 0.00 Cancelado 20 25 15 19 20 y piezas comunicativas para Landscape Management la difusión de los resultados de los análisis de conectividad y fragmentación de ecosistemas CO-PNF-78421-CS-INDV / Consultoría en ecoturismo que formule la estrategia de turismo y realice 3 talleres Component 3 - Sectoral 2018-10- 2018-10- 2018-11- 2018-11- 2019-03- con la comunidad para su TF / A5789 Programs for Sustainable Posterior Individual Limited 7,143.00 0.00 Cancelado 18 23 07 28 29 concertación. en el marco Landscape Management de la línea sistemas producción no tradicionales (ecoturismo) del Plan de Manejo CO-PNF-78407-CS-INDV / Estudios y documentación Component 1 - Protected técnica de la nueva Área 2018-10- 2018-10- 2018-11- 2018-12- 2019-04- TF / A5789 Areas Management and Posterior Individual Limited 12,143.00 0.00 Cancelado Protegida Regional Páramo 15 20 10 06 05 Financial Sustainability de Miraflores - Picachos - CORPOAMAZONIA CO-PNF-89794-CS-INDV / CORPOAMAZONIA: Component 3 - Sectoral 2018-12- 2018-12- 2019-01- 2019-02- 2020-01- Consultor Asesoría Montaje TF / A5789 Programs for Sustainable Posterior Individual Limited 42,857.00 0.00 Cancelado 20 25 10 04 31 del modelo integrado de Landscape Management desarrollo forestal. CO-PNF-123093-CS-INDV / Facilitar y gestionar como enlace técnico y operativo local, los procesos que se Component 1 - Protected adelante en la ruta 2019-07- 2019-07- 2019-08- 2019-08- 2020-08- TF / A5789 Areas Management and Posterior Individual Limited 15,484.00 0.00 Cancelado declaratoria del APR de Bajo 26 31 15 29 28 Financial Sustainability Caguán, Caquetá, con las comunidades (productores e indígenas) y actores institucionales. CO-PNF-144811-CS-INDV / Profesional que coordine el componente Plan de Acción de Control a la Deforestación y promoción Component 3 - Sectoral 2019-11- 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-09- 2020-10- para la incorporación de las TF / A5789 Programs for Sustainable Posterior Individual Limited 11,613.00 10,541.88 Finalizado 29 15 04 13 09 22 23 22 23 27 determinantes ambientales Landscape Management en los POT en el marco del cumplimiento a la Sentencia Amazonia No. 4360/2018, en la jurisdicción de Cor CO-PNF-144814-CS-INDV / Profesional que desarrolle de los temas de aprovechamiento forestal, Component 3 - Sectoral planes de manejo y 2019-11- 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-09- 2020-10- TF / A5789 Programs for Sustainable Posterior Individual Limited 11,613.00 10,541.88 Finalizado ordenación forestal, para 29 20 04 20 10 22 24 22 21 28 Landscape Management apoyar la implementación de las acciones a corto plazo en el marco del cumplimiento a la Sentencia Amazonia No. 4360/2018, en la jurisdicción CO-PNF-89769-CS-INDV / Profesionales de apoyo al Component 2 - Forest monitoreo de efectividad en 2018-12- 2019-01- 2019-01- 2019-02- 2020-01- TF / A5789 Governance, Management Posterior Individual Limited 24,544.00 0.00 Cancelado la reducción de la 27 01 09 04 30 and Monitoring deforestación y análisis de conectividad a nivel de paisaje. MDF1 CO-PNF-89775-CS-INDV / Profesionales de apoyo al Component 2 - Forest monitoreo de efectividad en 2018-12- 2019-01- 2019-01- 2019-02- 2020-01- TF / A5789 Governance, Management Posterior Individual Limited 24,544.00 0.00 Cancelado la reducción de la 27 01 03 04 31 and Monitoring deforestación y análisis de conectividad a nivel de paisaje. MDF2 CO-PNF-89780-CS-INDV / Profesional de seguimiento Component 3 - Sectoral 2018-12- 2019-01- 2019-01- 2019-02- 2020-01- y apoyo a la planeación y TF / 18478 Programs for Sustainable Posterior Individual Limited 21,429.00 0.00 Cancelado 27 01 15 04 31 ejecución operativa regional Landscape Management (Guaviare) CO-PNF-145712-CS-CDS / Realización análisis de cadenas de valor de Productos Maderables y No Maderables del Bosque Component 3 - Sectoral Selección directa 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-07- 2020-08- identificados con potencial TF / A5789 Programs for Sustainable Posterior Direct 19,355.00 17,569.80 Finalizado de consultores 13 23 23 30 22 14 20 28 comercial para el programa Landscape Management de Forestería Comunitaria de Asocapricho, con el fin de valorar inversiones y acciones estratégicas por real CO-PNF-96470-CS-INDV / Profesional de Apoyo gestión técnica, operativa y Component 3 - Sectoral 2019-01- 2019-02- 2019-02- 2019-03- 2019-09- comunitaria de actividades TF / A5789 Programs for Sustainable Posterior Individual Limited 9,677.00 0.00 Cancelado 29 03 20 08 04 de control y vigilancia de Landscape Management Corpoamazonia en Ramsar Tarapoto. CO-PNF-137123-CS-INDV / Coordinar la formulación del plan de manejo del PNN Component 1 - Protected Serrania de Chiribiquete de 2019-10- 2019-10- 2019-11- 2019-11- 2020-05- TF / A5789 Areas Management and Posterior Individual Limited 13,161.00 0.00 Cancelado manera participativa y de 21 29 13 29 27 Financial Sustainability acuerdo a los lineamientos institucionales de Parques Nacionales CO-PNF-103495-CS-INDV / Apoyar la elaboración de documentos técnicos de las determinantes ambientales asociadas a la reducción a Component 3 - Sectoral 2019-03- 2019-03- 2019-04- 2019-04- 2019-08- cero deforestación y la TF / 18478 Programs for Sustainable Posterior Individual Limited 7,742.00 0.00 Cancelado 15 20 02 15 14 adaptación al cambio Landscape Management climático de las Corporaciones y realizar la evaluación de los POT de los municipios del Guaviare, en cu CO-PNF-63403-CS-INDV / Coordinar, orientar y liderar Component 3 - Sectoral la implementación de los 2018-07- 2018-07- 2018-08- 2018-08- 2019-02- TF / 18478 Programs for Sustainable Posterior Individual Limited 17,500.00 0.00 Cancelado acuerdos de conservación, 13 18 01 29 25 Landscape Management restauración y no deforestación - CDA CO-PNF-118107-CS-INDV / Construir y desarrollar una guía de investigación Component 3 - Sectoral preestructurada en 2020-02- 2020-04- 2020-02- 2020-04- 2020-03- 2020-06- 2020-03- 2020-06- 2020-06- 2020-11- TF / A5789 Programs for Sustainable Posterior Individual Limited 3,871.00 3,219.72 Finalizado educación, gestión y 12 23 17 24 02 01 18 12 17 26 Landscape Management conservación de uso sostenible del territorio siguiendo los lineamientos pedagógicos ONDAS CO-PNF-118108-CS-INDV / Consultor social de la Component 4 - Project evaluación de medio Coordination, 2019-12- 2020-02- 2019-12- 2020-02- 2020-01- 2020-03- 2020-01- 2020-03- 2020-04- 2020-07- TF / A5789 Posterior Individual Limited 9,677.00 7,336.80 Finalizado término de la iniciativa Management, Monitoring 18 03 23 03 06 02 22 16 22 24 Conservación de bosques y and Evaluation (M&E) sostenibilidad en el corazón de la amazonia CO-PNF-123094-CS-INDV Component 4 - Project / Consultor que lidere la Coordination, 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2020-01- 2020-01- 2020-02- 2020-05- 2020-08- evaluación de medio TF / A5789 Posterior Individual Limited 15,484.00 14,152.80 Finalizado Management, Monitoring 18 09 23 09 06 28 20 11 20 26 término de GEF Corazón de and Evaluation (M&E) la Amazonia. Component 4 - Project CO-PNF-150302-CS-CDS Coordination, Selección directa 2019-12- 2019-12- 2020-01- 2020-01- 2020-01- 2020-01- 2021-01- 2021-01- / Coordinación General del TF / A5789 Posterior Direct 50,496.00 46,247.23 Finalizado Management, Monitoring de consultores 30 19 09 03 30 16 24 12 Proyecto- 2020. and Evaluation (M&E) Component 4 - Project CO-PNF-150304-CS-CDS Coordination, Selección directa 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2021-01- 2020-12- / Especialista Financiera- TF / A5789 Posterior Direct 35,535.00 32,258.15 Finalizado Management, Monitoring de consultores 30 19 09 30 30 03 24 16 2020. and Evaluation (M&E) Page 10 CO-PNF-150306-CS-CDS / Coordinación técnica acciones asociadas con la Component 1 - Protected implementación de Selección directa 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2021-01- 2021-01- TF / A5789 Areas Management and Posterior Direct 34,219.00 31,159.94 Finalizado Herencia Colombia - GEF de consultores 30 18 09 30 30 24 24 13 Financial Sustainability Corazón Amazonia y la DTAM - PNN y CORPOAMAZONIA y apoyo a la preparación GEF7 CA. CO-PNF-150310-CS-CDS / Profesional de apoyo para Component 3 - Sectoral Selección directa 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2021-01- 2020-12- la implementación de TF / A5789 Programs for Sustainable Posterior Direct 32,876.00 29,844.06 Finalizado de consultores 30 18 09 30 30 03 24 18 acuerdos con el sector de Landscape Management infraestructura vial. CO-PNF-150313-CS-CDS / Profesional apoyo a la Component 3 - Sectoral Selección directa 2019-12- 2019-12- 2020-01- 2020-01- 2020-01- 2020-02- 2021-01- 2021-04- CDA en la incorporación de TF / A5789 Programs for Sustainable Posterior Direct 19,204.00 17,322.52 Finalizado de consultores 30 19 09 27 30 21 24 22 criterios ambientales para Landscape Management proyectos de red vial terciarias - 2020. CO-PNF-150315-CS-CDS / Profesional apoyo a la Component 3 - Sectoral Corpoamazonia en la Selección directa 2019-12- 2020-01- 2020-01- 2020-01- 2020-01- 2020-02- 2021-01- 2021-04- TF / A5789 Programs for Sustainable Posterior Direct 19,204.00 16,998.68 Finalizado incorporación de criterios de consultores 30 15 09 28 30 27 24 23 Landscape Management ambientales para proyectos de red vial terciarias - 2020. CO-PNF-150316-CS-CDS / Profesional apoyo a la Component 3 - Sectoral gestión territorial y de Selección directa 2019-12- 2019-12- 2020-01- 2020-01- 2020-01- 2020-01- 2021-01- 2021-01- TF / A5789 Programs for Sustainable Posterior Direct 32,206.00 29,236.15 Finalizado seguimiento a la planeación de consultores 30 19 09 03 30 22 24 15 Landscape Management y ejecución operativa regional (Caquetá - Putumayo) - 2020. CO-PNF-150321-CS-CDS / Profesional apoyo a la Component 3 - Sectoral Selección directa 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2021-01- 2020-12- gestión territorial y de TF / A5789 Programs for Sustainable Posterior Direct 27,097.00 24,597.72 Finalizado de consultores 30 19 09 30 30 09 24 21 seguimiento a la planeación Landscape Management y ejecución operativa regional (Guaviare). CO-PNF-150322-CS-CDS / Profesional agroforestal Component 3 - Sectoral implementación de Selección directa 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2021-01- 2020-12- TF / A5789 Programs for Sustainable Posterior Direct 22,142.00 20,099.85 Finalizado acuerdos de conservación, de consultores 30 19 09 30 30 03 24 16 Landscape Management restauración y no deforestación en las áreas de intervención CDA. CO-PNF-118109-CS-INDV / Consultor financiero de la Component 4 - Project evaluación de medio Coordination, 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-02- 2020-02- 2020-03- 2020-05- TF / A5789 Posterior Individual Limited 9,677.00 7,336.80 Firmado término de la Iniciativa Management, Monitoring 03 03 08 03 22 10 07 09 08 Conservación de bosques y and Evaluation (M&E) sostenibilidad en el Corazón de la Amazonia CO-PNF-150398-CS-CDS / Prestar sus servicios profesionales para orientar y servir de enlace técnico de CORPOAMAZONIA y el Component 3 - Sectoral Selección directa 2020-02- 2020-02- 2020-02- 2020-02- 2020-03- 2020-02- 2021-03- 2021-01- Proyecto “Conservación de TF / A5789 Programs for Sustainable Posterior Direct 40,645.00 37,011.24 Finalizado de consultores 07 04 17 05 09 11 04 19 bosques y sostenibilidad Landscape Management para la implementación de las líneas de acción de nuevas áreas protegidas, restauración de áreas degradad CO-PNF-161550-CS-CDS / Prestar sus servicios profesionales para orientar el proceso de comunicación Component 4 - Project y gestión del conocimiento Coordination, Selección directa 2020-03- 2020-03- 2020-04- 2020-03- 2020-05- 2020-04- 2021-05- 2021-05- TF / A5789 Posterior Direct 36,232.00 27,829.53 Finalizado del Proyecto GEF CA que Management, Monitoring de consultores 30 17 09 19 07 24 02 10 permita posicionar su and Evaluation (M&E) implementación con actores estratégicos, mostrar y sistematizar avances, resultados y logros. CO-PNF-161553-CS-CDS / Prestar sus servicios profesionales para Diseñar y desarrollar los contenidos Component 4 - Project gráficos multiformato Coordination, Selección directa 2020-03- 2020-03- 2020-04- 2020-03- 2020-05- 2020-04- 2021-05- requeridos para la TF / A5789 Posterior Direct 32,206.00 24,780.29 Firmado Management, Monitoring de consultores 30 17 09 19 07 03 02 implementación de la and Evaluation (M&E) Estrategia de comunicaciones y gestión del conocimiento de la Iniciativa GEF Corazón de la Amazonia. CO-PNF-161555-CS-CDS / Prestar los servicios profesionales para brindar el soporte jurídico y político que demande la Unidad de Component 3 - Sectoral Selección directa 2020-03- 2020-03- 2020-04- 2020-03- 2020-05- 2020-04- 2021-05- 2021-05- Coordinación del Proyecto TF / A5789 Programs for Sustainable Posterior Direct 42,674.00 32,818.01 Finalizado de consultores 30 17 09 19 07 20 02 07 para el desarrollo de los Landscape Management componentes del GEF Corazón Amazonía, para el manejo sostenible del paisaje, especialmente en tema CO-PNF-161564-CS-CDS Component 4 - Project / Profesional apoyo Coordination, Selección directa 2020-03- 2020-03- 2020-04- 2020-03- 2020-05- 2020-04- 2020-10- salvaguardas ambientales y TF / B1287 Posterior Direct 5,000.00 3,723.00 Firmado Management, Monitoring de consultores 30 17 09 19 07 06 04 sociales (preparación de and Evaluation (M&E) documentos) CO-PNF-75462-CS-INDV / Analista espacial para la revisión, corrección, Component 2 - Forest complementación y 2018-09- 2018-09- 2018-10- 2018-11- 2019-03- TF / A5789 Governance, Management Posterior Individual Limited 6,429.00 0.00 Cancelado unificación de la 20 25 16 13 15 and Monitoring información de accesibilidad, interpretada en la Amazonía colombiana- IDEAM CO-PNF-123097-CS-INDV / Construcción Estrategia de difusión y divulgación Component 3 - Sectoral Sitio Ramsar Estrella Fluvial 2020-06- 2020-05- 2020-07- 2020-05- 2020-07- 2020-06- 2020-08- 2020-07- 2020-12- 2021-01- TF / A5789 Programs for Sustainable Posterior Individual Limited 6,452.00 5,518.80 Finalizado del Inírida - EFI, con la 30 14 05 15 19 09 02 08 30 06 Landscape Management Mesa Ramsar EFI y articulada a la Estrategia de Comunicaciones de GEF CA. CO-PNF-150320-CS-CDS / Profesional que coordine y oriente la implementación de acuerdos de Component 3 - Sectoral Selección directa 2020-06- 2020-04- 2020-07- 2020-04- 2020-07- 2020-05- 2021-07- conservación, restauración TF / A5789 Programs for Sustainable Posterior Direct 27,097.00 22,580.88 Firmado de consultores 30 27 10 28 31 27 26 y no deforestación en las Landscape Management áreas de intervención CDA y demás líneas de acción que adelanta la CDA. CO-PNF-161574-CS-INDV Component 4 - Project / Consultor para el analisis Coordination, 2020-03- 2020-04- 2020-04- 2020-05- 2020-11- TF / B1287 Posterior Individual Limited 4,000.00 0.00 Cancelado economico y financiero del Management, Monitoring 30 07 22 08 04 proyecto and Evaluation (M&E) Component 4 - Project CO-PNF-150130-CS-INDV Coordination, 2020-01- 2020-02- 2020-01- 2020-02- 2020-01- 2020-01- 2020-10- TF / B1287 Posterior Individual Limited 36,000.00 0.00 Cancelado / Coordinador de la PPG Management, Monitoring 06 19 11 19 16 30 26 and Evaluation (M&E) CO-PNF-167966-CS-INDV / Profesional enlace de CORPOAMAZONIA en el proceso de concertación comunitaria e institucional, Component 1 - Protected 2020-06- 2020-04- 2020-07- 2020-04- 2020-07- 2020-05- 2020-08- 2020-05- 2021-08- 2021-05- zonificación ambiental y TF / A5789 Areas Management and Posterior Individual Limited 27,097.00 22,580.88 Finalizado 30 14 08 14 23 14 08 27 03 07 ordenamiento productivo Financial Sustainability con fines de manejo de la Reserva Forestal de la Amazonia y áreas de sustracción en la zona del Bajo Caguán, de CO-PNF-144816-CS-INDV / Profesional que desarrolle actividades de seguimiento, orientación, articulación y desarrollo de procesos Component 3 - Sectoral 2019-11- 2020-02- 2019-12- 2019-12- 2019-12- 2020-09- jurídicos y legales, en TF / A5789 Programs for Sustainable Posterior Individual Limited 11,613.00 0.00 Cancelado 29 28 04 09 23 20 cumplimiento de la Landscape Management sentencia STC4360-2018, conforme al Plan de Acción para la lucha contra la deforestación en jurisdicción d CO-PNF-167988-CS-INDV / Prestar los servicios profesionales encaminados en generar acciones para la implementación de Component 3 - Sectoral 2020-06- 2020-05- 2020-07- 2020-05- 2020-07- 2020-05- 2020-07- 2020-06- 2021-04- actividades en el manejo de TF / A5789 Programs for Sustainable Posterior Individual Direct 14,516.00 12,073.95 Firmado 30 07 10 12 17 22 31 03 27 las áreas de uso sostenible Landscape Management y en sistemas de producción no tradicionales en los sitios Ramsar Lagos de Tarapoto y Estrella Fluvial In CO-PNF-167972-CS-INDV / Profesionales apoyo técnico a la consolidación de acuerdos en Áreas y Component 3 - Sectoral temas de Interés común con 2020-06- 2020-04- 2020-07- 2020-04- 2020-07- 2020-07- 2021-03- TF / A5789 Programs for Sustainable Posterior Individual Direct 16,462.00 0.00 Cancelado los resguardos colindantes 30 15 10 17 17 31 28 Landscape Management al Parque Nacional Serranía de Chiribiquete que contribuyan al mejoramiento de la gobernanza ambiental del territorio. CO-PNF-150327-CS-INDV / Profesional que coordine la implementación de acciones de seguimiento y Component 1 - Protected monitoreo, sostenibilidad 2019-12- 2020-04- 2020-01- 2020-01- 2020-02- 2021-02- TF / A5789 Areas Management and Posterior Individual Limited 34,839.00 0.00 Cancelado financiera y operación 30 07 07 22 07 01 Financial Sustainability técnica, en los mosaicos priorizados para la fase 1 de Herencia Colombia, en el marco de Corazón Amazonia. CO-PNF-167983-CS-INDV / Prestar los servicios profesionales para elaborar la estrategia de apoyo al programa de control y Component 3 - Sectoral 2020-06- 2020-05- 2020-07- 2020-05- 2020-07- 2020-05- 2020-08- 2020-06- 2021-05- vigilancia para el sitio TF / A5789 Programs for Sustainable Posterior Individual Direct 14,516.00 16,302.75 Firmado 30 08 10 12 20 22 06 03 03 Ramsar Estrella Fluvial Landscape Management Inírida y la estrategia de apoyo al Programa Monitoreo y Vigilancia para el sitio Ramsar Complejo de Humedal CO-PNF-178655-CS-INDV Component 4 - Project / Especialista en Coordination, 2020-07- 2020-06- 2020-08- 2020-07- 2020-08- 2020-07- 2020-08- 2020-07- 2021-08- TF / A5789 Posterior Individual Direct 36,232.00 30,616.19 Firmado Adquisiciones proyecto GEF Management, Monitoring 30 19 09 08 16 10 30 15 25 Corazón de la Amazonia. and Evaluation (M&E) CO-PNF-178657-CS-INDV / Profesional armonización del Plan de Desarrollo Departamental - PDD y Plan de Ordenamiento Territorial Component 3 - Sectoral Departamental – POTD, 2020-06- 2020-06- 2020-07- 2020-07- 2020-07- 2020-07- 2020-07- 2020-08- 2020-10- 2020-11- TF / A5789 Programs for Sustainable Posterior Individual Direct 7,742.00 6,387.60 Finalizado conforme a la dimensión 30 18 10 06 17 27 31 05 29 30 Landscape Management ambiental (aspectos biofísicos), generando escenarios de planificación territorial estratégica para la ges CO-PNF-178659-CS-INDV / Profesional que generé información espacial para la implementación de los Acuerdos de Conservación, Component 3 - Sectoral 2020-06- 2020-06- 2020-07- 2020-06- 2020-07- 2020-07- 2020-07- 2020-07- 2021-07- Restauración y no TF / A5789 Programs for Sustainable Posterior Individual Direct 16,103.00 13,607.19 Firmado 30 18 10 23 17 10 31 21 26 Deforestación, en el Landscape Management Departamento del Guaviare, Jurisdicción de la Corporación para el Desarrollo Sostenible del Norte y del Oriente Amaz CO-PNF-178660-CS-INDV / Profesional que oriente y ejecute las acciones programadas por CORPOAMAZONIA para el Component 3 - Sectoral establecimiento y 2020-06- 2020-06- 2020-07- 2020-06- 2020-07- 2020-07- 2020-07- 2020-07- 2021-07- TF / A5789 Programs for Sustainable Posterior Individual Direct 28,181.00 23,812.59 Firmado mantenimiento de los 30 18 10 26 17 01 31 13 26 Landscape Management acuerdos de conservación, restauración y no deforestación, en el municipio de Cartagena del Chairá departamento del Caquetá. CO-PNF-178664-CS-INDV / Profesional que elabore la Estrategia y Plan de Adquisiciones, y apoyar la Component 4 - Project actualización del Manual Coordination, 2020-06- 2020-06- 2020-07- 2020-08- 2020-07- 2020-08- 2020-07- 2020-08- 2020-10- Operativo del Proyecto con TF / B1287 Posterior Individual Direct 4,645.00 3,303.99 Firmado Management, Monitoring 30 26 10 18 17 19 31 28 29 sus respectivos Anexos, en and Evaluation (M&E) los temas de adquisiciones, en el marco de la formulación del nuevo financiamiento de GEF CO-PNF-182823-CS-INDV / Coordinación concertación y generación de insumos técnicos para la Component 4 - Project preparación del nuevo Coordination, 2020-07- 2020-08- 2020-08- 2020-08- 2020-08- 2020-08- 2020-08- 2020-09- 2021-01- financiamiento adicional de TF / B1287 Posterior Individual Direct 4,925.00 4,292.15 Firmado Management, Monitoring 30 14 09 21 16 25 30 17 27 GEF Corazón de la and Evaluation (M&E) Amazonia a través del GEF7 con las entidades socias, las áreas de Patrimonio Natural y el punto focal del GEF en el MADS CO-PNF-182726-CS-INDV / Prestar sus servicios profesionales para realizar los documentos y anexos Component 4 - Project enfocados a los temas Coordination, 2020-07- 2020-08- 2020-08- 2020-08- 2020-08- 2020-08- 2020-09- 2020-09- 2021-02- financieros y consolidación TF / B1287 Posterior Individual Direct 3,582.00 3,121.56 Firmado Management, Monitoring 30 14 22 21 30 25 13 17 10 de las contrapartidas en and Evaluation (M&E) especie, en el marco de la formulación del nuevo financiamiento de GEF Corazón de la Amazonia (GEF7). Page 11 CO-PNF-189689-CS-INDV / Sistematizar la experiencia y documentar la Component 4 - Project implementación del Coordination, 2020-09- 2020-08- 2020-10- 2020-09- 2020-10- 2020-09- 2020-10- 2020-09- 2021-10- proyecto GEF Corazón de la TF / A5789 Posterior Individual Direct 20,490.00 17,855.32 Firmado Management, Monitoring 30 27 10 03 17 10 31 29 26 Amazonia y realizar el and Evaluation (M&E) seguimiento a la aplicación de los instrumentos de salvaguardas sociales. CO-PNF-150129-CS-INDV Component 4 - Project / Especialista en cadena de Coordination, 2020-01- 2020-02- 2020-01- 2020-01- 2020-01- 2020-05- TF / B1287 Posterior Individual Limited 10,000.00 0.00 Cancelado valor productiva sostenible Management, Monitoring 06 25 11 16 30 29 PPG. and Evaluation (M&E) CO-PNF-150325-CS-INDV / Profesional que defina el Component 3 - Sectoral 2020-06- 2020-07- 2020-07- 2020-08- 2021-08- plan de negocio y TF / A5789 Programs for Sustainable Posterior Individual Limited 19,355.00 0.00 Cancelado 30 08 23 07 02 priorización de productos Landscape Management para el encadenamiento productivo CO-PNF-194030-CS-INDV / Prestar sus servicios profesionales para definir e implementar criterios y lineamientos técnicos para Component 1 - Protected 2020-12- 2020-10- 2021-01- 2020-10- 2021-01- 2020-11- 2021-02- 2020-11- 2021-11- realizar el proceso de TF / A5789 Areas Management and Posterior Individual Limited 12,090.00 11,840.18 Firmado 30 07 07 08 22 12 07 24 04 zonificación ambiental a Financial Sustainability escala 1:25.000 con fines de manejo de la reserva forestal de la Amazonia y áreas de sustracción CO-PNF-194036-CS-INDV / Prestar sus servicios profesionales para generar y procesar información Component 1 - Protected espacial a escala 1:25.000 2020-12- 2020-12- 2021-01- 2020-12- 2021-01- 2021-01- 2021-02- 2021-01- 2021-08- TF / A5789 Areas Management and Posterior Individual Limited 8,060.00 7,471.98 Firmado orientada a la zonificación 30 03 07 10 22 13 07 26 06 Financial Sustainability ambiental y ordenamiento con fines de manejo de la Reserva Forestal de la Amazonia y áreas de sustracción CO-PNF-194040-CS-INDV / Prestar sus servicios profesionales en la elaboración del componente social en el Component 1 - Protected 2020-12- 2020-10- 2021-01- 2020-10- 2021-01- 2020-11- 2021-02- 2020-11- 2021-11- proceso de concertación TF / A5789 Areas Management and Posterior Individual Limited 12,090.00 11,840.18 Firmado 30 07 07 08 22 09 07 24 04 comunitaria e institucional Financial Sustainability para la zonificación ambiental y el ordenamiento a escala 1:25.000 en la Reserva Forestal de la Amazonia CO-PNF-197247-CS-INDV / Prestar sus servicios profesionales para apoyar la realización de procesos de Component 4 - Project adquisiciones y Coordination, 2020-10- 2020-10- 2020-11- 2020-10- 2020-11- 2020-10- 2020-11- 2020-10- 2021-11- 2020-12- contrataciones que se TF / A5789 Posterior Individual Direct 19,744.00 17,317.16 Finalizado Management, Monitoring 30 02 09 05 16 07 30 19 25 28 requieran de acuerdo con lo and Evaluation (M&E) establecido en el Acuerdo Legal de Donación, el Manual Operativo del Proyecto, el Plan de Adquisiciones CO-PNF-200244-CS-INDV / Apoyar a la Coordinación General del Proyecto “Conservación de Bosques y Component 4 - Project Sostenibilidad en el Coordination, 2020-12- 2020-10- 2021-01- 2020-11- 2021-01- 2020-12- 2021-01- 2020-12- 2022-01- TF / A5789 Posterior Individual Direct 33,528.00 32,836.75 Firmado Corazón de la Amazonía”, Management, Monitoring 30 29 09 10 16 04 30 14 25 en el seguimiento y and Evaluation (M&E) documentación de los procesos de programación, ejecución y evaluación de la iniciativa. CO-PNF-200246-CS-INDV / Orientar y acompañar los procesos de concertación y fortalecimiento de capacidades con las Component 1 - Protected comunidades y 2020-12- 2020-10- 2021-01- 2020-10- 2021-01- 2020-11- 2021-01- 2020-11- 2022-01- TF / A5789 Areas Management and Posterior Individual Direct 18,376.00 17,997.07 Firmado organizaciones sociales 30 29 09 30 16 17 30 26 25 Financial Sustainability para el desarrollo de la ruta de declaratoria de un área protegida regional, la gestión de estrategias complementarias CO-PNF-170216-CS-INDV / Profesional en el área de comunicación, que realicer la preproducción, Component 4 - Project producción y Coordination, 2020-06- 2020-08- 2020-07- 2020-07- 2020-08- 2020-09- TF / B1287 Posterior Individual Limited 2,419.00 0.00 Cancelado posproducción de un vídeo Management, Monitoring 30 05 08 23 08 07 que brinde información de and Evaluation (M&E) GEF Corazón de la Amazonia - GEF 7 de animación digital de tres (3) minutos de duración en formato HD y optimizado CO-PNF-161567-CS-INDV para Component 4 - Project / Asistente técnico para la Coordination, 2020-09- 2020-10- 2020-10- 2020-11- 2021-05- TF / B1287 Previa Individual Limited 5,807.00 0.00 Cancelado preparación del proyecto Management, Monitoring 30 08 23 14 13 corazón de la Amazonía and Evaluation (M&E) GEF 7 CO-PNF-204767-CS-INDV / Profesional de Apoyo Component 3 - Sectoral técnico para los procesos 2020-12- 2020-11- 2021-01- 2020-11- 2021-01- 2020-12- 2021-01- 2020-12- 2022-01- TF / A5789 Programs for Sustainable Posterior Individual Direct 17,910.00 17,546.40 Firmado de Adquisiciones y 30 24 09 26 16 14 30 21 25 Landscape Management contratación en los departamentos del Caquetá y Putumayo CO-PNF-161559-CS-INDV / Profesional de apoyo para el seguimiento, Component 4 - Project consolidación y análisis de Coordination, 2020-08- 2020-09- 2020-09- 2020-10- 2021-04- información de las TF / A5789 Posterior Individual Limited 10,746.00 0.00 Cancelado Management, Monitoring 30 07 22 14 12 iniciativas del Fondo para el and Evaluation (M&E) Medio Ambiente Mundial orientadas por el Ministerio de Ambiente y Desarrollo Sostenible CO-PNF-170213-CS-INDV Component 3 - Sectoral / Profesional de apoyo en 2020-12- 2021-01- 2021-01- 2021-02- 2021-08- TF / A5789 Programs for Sustainable Posterior Individual Limited 9,677.00 0.00 Cancelado adquisiciones para la CAZ, 30 07 22 07 06 Landscape Management sede Florencia, caqueta. CO-PNF-200248-CS-INDV / Prestar sus servicios profesionales de apoyo en el componente de Component 1 - Protected ordenamiento a escala 2020-12- 2020-12- 2021-01- 2020-12- 2021-01- 2021-01- 2021-02- 2021-02- 2021-11- TF / A5789 Areas Management and Posterior Individual Limited 12,090.00 11,583.00 Firmado 1:25.000 con fines de 30 03 07 04 22 13 07 11 04 Financial Sustainability manejo de la Reserva Forestal de la Amazonia y áreas de sustracción en la zona del Bajo Caguán, departamento del Caquetá, como estrategia CO-PNF-171670-CS-INDV / Prestar sus servicios profesionales con el fin de realizar la preproducción, Component 4 - Project producción y Coordination, 2020-12- 2021-01- 2021-01- 2021-02- 2021-06- posproducción de piezas TF / B1287 Posterior Individual Limited 15,821.00 0.00 Cancelado Management, Monitoring 30 07 22 07 07 comunicativas multimedia and Evaluation (M&E) en formato digital con el fin de facilitar la distribución y divulgación de los avances en la implementación CO-PNF-170214-CS-INDV / Profesional de Apoyo Component 3 - Sectoral técnico para los procesos 2020-12- 2021-01- 2021-01- 2021-02- 2021-08- TF / A5789 Programs for Sustainable Posterior Individual Limited 9,677.00 0.00 Cancelado de Adquisiciones y 30 07 22 07 06 Landscape Management contratación en el departamento del Guaviare- CDA. CO-PNF-210770-CS-INDV / Ejercer la coordinación general del Proyecto Component 4 - Project “Conservación de Bosques y Coordination, 2021-03- 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- Sostenibilidad en el TF / A5789 Posterior Individual Direct 49,028.00 47,238.22 Firmado Management, Monitoring 30 29 09 04 16 05 30 05 10 Corazón de la Amazonia”, and Evaluation (M&E) de conformidad con los lineamientos establecidos en el Acuerdo Interinstitucional y el Manual Operativo. CO-PNF-210776-CS-INDV / Prestar servicios profesionales como Especialista financiero del Component 4 - Project Proyecto y orientar a las Coordination, 2021-03- 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- entidades socias en los TF / A5789 Posterior Individual Direct 34,199.00 32,950.44 Firmado Management, Monitoring 30 28 09 04 16 05 30 12 10 procedimientos fiduciarios and Evaluation (M&E) de conformidad con las directrices financieras del Banco Mundial y procedimientos de Patrimonio Natural. CO-PNF-210779-CS-INDV / Prestar sus servicios profesionales para apoyar a Component 4 - Project la coordinación general del Coordination, 2021-03- 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- proyecto “Conservación y TF / A5789 Posterior Individual Direct 30,995.00 29,906.15 Firmado Management, Monitoring 30 29 09 04 16 12 30 12 10 Sostenibilidad de Bosques and Evaluation (M&E) en el Corazón de la Amazonia” como enlace regional que facilite la gestión territorial. CO-PNF-210781-CS-INDV / Prestar sus servicios profesionales para apoyar a Component 4 - Project la Coordinación General del Coordination, 2021-03- 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- proyecto “Conservación y TF / A5789 Posterior Individual Direct 26,078.00 25,090.67 Firmado Management, Monitoring 30 28 09 04 16 15 30 21 10 Sostenibilidad de Bosques and Evaluation (M&E) en el Corazón de la Amazonia” como enlace regional que facilite la gestión territorial. CO-PNF-210786-CS-INDV / Prestar sus servicios profesionales para el diseño, implementación y Component 2 - Forest 2021-03- 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- validación del sistema de TF / A5789 Governance, Management Posterior Individual Direct 32,239.00 29,950.56 Firmado 30 28 09 04 16 15 30 26 10 control de calidad del and Monitoring Sistema de Monitoreo de Bosques y Carbono a nivel nacional y/o regional. CO-PNF-210794-CS-INDV / Prestar sus servicios profesionales para apoyar en el seguimiento técnico y Component 2 - Forest operativo de las actividades 2021-03- 2021-02- 2021-04- 2021-02- 2021-04- 2021-02- 2021-04- 2021-02- 2022-04- TF / A5789 Governance, Management Posterior Individual Direct 25,075.00 23,679.60 Firmado relacionadas con la 30 03 09 03 16 10 30 17 10 and Monitoring continuidad en la operación del Sistema de Monitoreo de Bosques y Carbono para Colombia – SMBYC. CO-PNF-210797-CS-INDV / Prestar sus servicios profesionales para generar Alertas Tempranas de Component 2 - Forest Deforestación e información 2021-03- 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- TF / A5789 Governance, Management Posterior Individual Direct 22,997.00 21,838.53 Firmado temática de monitoreo de la 30 29 09 06 16 18 30 25 10 and Monitoring superficie de bosque y deforestación a nivel nacional y/o regional, con especial dedicación al Componente 2. CO-PNF-210799-CS-INDV / Prestar sus servicios profesionales para generar la información de Alertas Component 2 - Forest Tempranas de 2021-03- 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- TF / A5789 Governance, Management Posterior Individual Direct 22,997.00 21,364.73 Firmado Deforestación, así como en 30 29 09 04 16 18 30 25 10 and Monitoring la generación de información temática de monitoreo de la superficie de bosque y deforestación a nivel nacional y/o regional. CO-PNF-210802-CS-INDV / Prestar sus servicios profesionales para apoyar la generación de información Component 4 - Project temática de monitoreo de Coordination, 2021-03- 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- TF / A5789 Posterior Individual Direct 21,493.00 19,967.04 Firmado alertas tempranas de Management, Monitoring 30 29 09 04 16 15 30 26 10 deforestación y minería and Evaluation (M&E) ilegal en áreas de interés de la Dirección Territorial Amazonia -DTAM. CO-PNF-210804-CS-INDV / Prestar sus servicios profesionales para desarrollar las acciones de Component 4 - Project comunicación, coordinación Coordination, 2021-03- 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- TF / A5789 Posterior Individual Direct 32,932.00 31,685.93 Firmado y orientación técnica Management, Monitoring 30 28 09 04 16 15 30 21 10 necesarias para asegurar la and Evaluation (M&E) articulación entre los niveles local (6 áreas priorizadas), regional (DTAM) y nacional de PNN. CO-PNF-210806-CS-INDV / Prestar sus servicios profesionales con el fin de coordinar el apoyo técnico Component 4 - Project para la consolidación e Coordination, 2021-03- 2020-12- 2021-04- 2021-02- 2021-04- 2021-02- 2021-04- 2021-03- 2022-02- implementación de los TF / A5789 Posterior Individual Direct 18,627.00 16,951.58 Firmado Management, Monitoring 30 28 09 04 16 16 30 02 24 acuerdos en áreas y temas and Evaluation (M&E) de Interés común con los resguardos colindantes al Parque Nacional Serranía de Chiribiquete. CO-PNF-210809-CS-INDV / Prestar sus servicios profesionales para realizar las acciones encaminadas a Component 4 - Project la formulación de Coordination, 2021-03- 2021-02- 2021-04- 2021-02- 2021-04- 2021-02- 2021-04- 2021-02- 2022-04- TF / A5789 Posterior Individual Direct 31,640.00 29,080.24 Firmado recomendaciones técnicas Management, Monitoring 30 03 09 04 16 12 30 19 10 ambientales, brindando la and Evaluation (M&E) asesoría necesaria para su incorporación en lineamientos técnicos. CO-PNF-210813-CS-INDV / Prestar sus servicios profesionales para Component 4 - Project coordinar, impulsar, Coordination, 2021-03- 2021-02- 2021-04- 2021-02- 2021-04- 2021-02- 2021-04- 2021-03- 2022-04- acompañar la gestión TF / A5789 Posterior Individual Direct 37,161.00 35,095.66 Firmado Management, Monitoring 30 23 09 24 16 10 30 12 10 interinstitucional y and Evaluation (M&E) adopción de acuerdos, criterios y herramientas de planeación y gestión ambiental sostenible. Page 12 CO-PNF-210814-CS-INDV / Prestar sus servicios profesionales para liderar y orientar las actividades de consolidación, Component 3 - Sectoral 2021-03- 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- establecimiento y TF / A5789 Programs for Sustainable Posterior Individual Direct 21,309.00 20,416.28 Firmado 30 29 09 04 16 15 30 25 10 evaluación de los acuerdos Landscape Management de conservación, restauración y no deforestación, en las áreas priorizadas por la Corporación. CO-PNF-210815-CS-INDV / Prestar sus servicios profesionales para servir de enlace entre Component 1 - Protected Corpoamazonia y el 2021-03- 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-02- 2022-04- TF / A5789 Areas Management and Posterior Individual Direct 39,116.00 37,477.44 Firmado Proyecto “Conservación de 30 28 09 14 16 28 30 02 10 Financial Sustainability bosques y sostenibilidad en el Corazón de la Amazonia” para la implementación de las líneas de acción de áreas protegidas. CO-PNF-210818-CS-INDV / Prestar sus servicios profesionales para liderar y orientar la implementación Component 1 - Protected de la ruta de declaratoria de 2021-03- 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-02- TF / A5789 Areas Management and Posterior Individual Direct 17,910.00 16,969.80 Firmado área protegida regional y la 30 29 09 04 16 15 30 29 24 Financial Sustainability gestión de estrategias complementarias de conservación, mediante proceso de construcción. CO-PNF-210789-CS-INDV / Prestar sus servicios profesionales para apoyar a la coordinación del SMBYC y Component 2 - Forest a la Subdirección de 2021-03- 2020-12- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2022-04- TF / A5789 Governance, Management Posterior Individual Direct 25,075.00 24,125.64 Firmado Ecosistemas e Información 30 30 09 04 16 18 30 25 10 and Monitoring Ambiental del IDEAM en las actividades de seguimiento y monitoreo administrativo, financiero y de planeación. CO-PNF-210783-CS-INDV / Prestar sus servicios profesionales para liderar la continuidad en la operación Component 2 - Forest 2021-03- 2021-01- 2021-04- 2021-01- 2021-04- 2021-01- 2021-04- 2021-02- 2022-04- del componente técnico de TF / A5789 Governance, Management Posterior Individual Direct 39,403.00 37,752.00 Firmado 30 05 09 06 16 28 30 02 10 Monitoreo de la and Monitoring deforestación y/o degradación forestal del Sistema de Monitoreo de Bosques y Carbono (SMBYC). CO-PNF-223118-CS-INDV / Prestar sus servicios profesionales para brindar orientación técnica a los Component 1 - Protected análisis especializados y 2021-06- 2021-03- 2021-07- 2021-03- 2021-07- 2021-04- 2021-07- 2021-04- 2022-02- TF / A5789 Areas Management and Posterior Individual Direct 26,119.00 23,572.50 Firmado articular los lineamientos y 30 25 10 26 17 08 31 15 26 Financial Sustainability recomendaciones en materia de gobernanza territorial e instrumentos económico-financieros. CO-PNF-223130-CS-INDV / Realizar el análisis económico de estrategias de manejo sostenible del paisaje, a partir de la Component 1 - Protected 2021-06- 2021-03- 2021-07- 2021-03- 2021-07- 2021-04- 2021-07- 2021-04- 2022-01- valoración económica y TF / A5789 Areas Management and Posterior Individual Direct 16,299.00 14,776.94 Firmado 30 25 10 25 17 12 31 23 27 análisis costo beneficio Financial Sustainability privado y ambiental de acciones de transición productiva, restauración ecológica y abatimiento de carbono. CO-PNF-223133-CS-INDV / Prestar sus servicios profesionales como experto en análisis y modelación de datos espaciales para la Component 1 - Protected 2021-06- 2021-04- 2021-07- 2021-04- 2021-07- 2021-04- 2021-08- 2021-05- 2022-02- generación de insumos que TF / A5789 Areas Management and Posterior Individual Limited 12,537.00 11,314.80 Firmado 30 07 08 21 23 30 08 07 04 contribuyan en el análisis Financial Sustainability de los beneficios económicos de la restauración y la evaluación de la viabilidad de proyectos REDD+ CO-PNF-223135-CS-INDV / Profesional de apoyo para el seguimiento, Component 4 - Project consolidación y análisis de Coordination, 2021-06- 2021-05- 2021-07- 2021-07- 2021-08- 2022-02- información de las TF / A5789 Posterior Individual Limited 10,746.00 0.00 En ejecución Management, Monitoring 30 13 08 23 08 04 iniciativas del Fondo para el and Evaluation (M&E) Medio Ambiente Mundial orientadas por el Ministerio de Ambiente y Desarrollo Sostenible. CO-PNF-223138-CS-INDV / Prestar los servicios profesionales y apoyo a la gestión del Grupo de Comunicaciones del Component 4 - Project Minambiente, a través del Coordination, 2021-06- 2021-03- 2021-07- 2021-03- 2021-07- 2021-05- 2021-08- 2021-05- 2022-08- TF / A5789 Posterior Individual Limited 25,705.00 23,367.94 Firmado diseño, producción y Management, Monitoring 30 03 08 26 23 06 08 19 03 edición de contenidos and Evaluation (M&E) periodísticos, piezas gráficas y audiovisuales, para la divulgación y difusión de los programas. CO-PNF-223140-CS-INDV / Prestar sus servicios para realizar bajo las condicionantes técnicas e instrumentos determinados Component 3 - Sectoral 2021-06- 2021-05- 2021-08- 2021-08- 2021-09- 2022-02- por la Agencia Nacional de TF / A5789 Programs for Sustainable Posterior Individual Open 33,134.00 0.00 En ejecución 30 12 07 15 05 02 Tierras, el estudio y Landscape Management levantamiento topográfico de los predios de los beneficiarios del pilotaje de acceso a tierras. CO-PNF-204766-CS-INDV / Profesional de apoyo para el seguimiento, Component 4 - Project consolidación y análisis de Coordination, 2020-12- 2021-01- 2021-01- 2021-01- 2021-01- 2021-07- información de las TF / A5789 Posterior Individual Direct 10,746.00 0.00 Cancelado Management, Monitoring 30 20 09 16 30 29 iniciativas del Fondo para el and Evaluation (M&E) Medio Ambiente Mundial orientadas por el Ministerio de Ambiente y Desarrollo Sostenible. CO-PNF-194042-CS-INDV / Prestar sus servicios profesionales para diseñar, estructurar y formular el Component 1 - Protected Manual Operativo del 2020-12- 2020-11- 2021-01- 2020-12- 2021-01- 2021-02- 2021-06- TF / A5789 Areas Management and Posterior Individual Limited 12,239.00 0.00 Cancelado Programa Herencia 30 24 07 15 22 07 07 Financial Sustainability Colombia, que contenga los arreglos institucionales, instancias para la toma de decisiones, herramientas de gestión CO-PNF-200249-CS-INDV / Realizar bajo las condicionantes técnicas e instrumentos determinados por la Agencia Nacional de Component 3 - Sectoral 2020-12- 2020-12- 2021-01- 2020-12- 2021-01- 2021-02- 2021-07- Tierras, el estudio y TF / A5789 Programs for Sustainable Posterior Individual Limited 33,134.00 0.00 Cancelado 30 03 07 14 22 07 07 levantamiento topográfico Landscape Management de los predios de los beneficiarios del pilotaje de acceso a tierras para el departamento del Guaviare. CO-PNF-223122-CS-INDV / Prestar sus servicios profesionales para generar lineamientos y recomendaciones para la Component 1 - Protected 2021-06- 2021-03- 2021-07- 2021-03- 2021-07- 2021-04- 2021-07- 2021-04- 2022-02- proyección estratégica del TF / A5789 Areas Management and Posterior Individual Direct 20,896.00 18,858.00 Firmado 30 26 10 26 17 09 31 19 26 Fondo Patrimonio Natural, Financial Sustainability en lo relacionado con el escalamiento de la gobernanza territorial ambiental a nivel nacional. CO-PNF-223153-CS-INDV / Prestar sus servicios profesionales para dar soporte, apoyar y Component 4 - Project acompañar la realización de Coordination, 2021-06- 2021-03- 2021-07- 2021-03- 2021-07- 2021-04- 2021-07- 2021-04- 2022-07- procesos de adquisiciones y TF / A5789 Posterior Individual Direct 18,627.00 16,810.56 Firmado Management, Monitoring 30 25 10 25 17 06 31 12 26 contrataciones que se and Evaluation (M&E) requieran de acuerdo con lo establecido en el Acuerdo Legal de Donación, el Manual Operativo del Proyecto. CO-PNF-223182-CS-INDV / Prestar sus servicios profesionales para dar soporte, apoyar, acompañar Component 4 - Project la realización de procesos y Coordination, 2021-06- 2021-03- 2021-07- 2021-03- 2021-07- 2021-04- 2021-07- 2021-04- 2022-07- brindar apoyo jurídico en TF / A5789 Posterior Individual Direct 16,119.00 14,547.60 Firmado Management, Monitoring 30 25 10 25 17 06 31 12 26 las adquisiciones y and Evaluation (M&E) contrataciones que se requieran, de acuerdo con lo establecido en el Acuerdo Legal de Donación, el MO. CO-PNF-223128-CS-INDV / Prestar sus servicios profesionales para generar lineamientos y recomendaciones Component 1 - Protected 2021-06- 2021-03- 2021-07- 2021-03- 2021-07- 2021-04- 2022-02- 2021-04- 2022-09- enmarcadas a la proyección TF / A5789 Areas Management and Posterior Individual Direct 22,985.00 20,530.51 Firmado 30 25 10 29 17 06 19 23 17 estratégica del Fondo Financial Sustainability Patrimonio Natural y su contribución a la primera fase del Programa HeCO, en cuanto al desarrollo y aplicación eficiente y efe CO-PNF-223111-CS-INDV / Prestar sus servicios profesionales para desarrollar e implementar Component 4 - Project un pilotaje de la guía de Coordination, 2021-06- 2021-03- 2021-07- 2021-03- 2021-07- 2021-04- 2021-07- 2021-05- 2021-11- TF / A5789 Posterior Individual Direct 5,970.00 5,388.00 Firmado investigación para la Management, Monitoring 30 25 10 29 17 19 31 07 28 conservación de uso and Evaluation (M&E) sostenible del territorio, siguiendo los lineamientos pedagógicos del programa ONDAS. CO-PNF-182722-CS-INDV / Profesional que apoye el desarrollo de la estrategia de difusión y Component 1 - Protected 2021-06- 2021-04- 2021-07- 2021-04- 2021-07- 2021-05- 2021-08- 2021-06- 2022-03- comunicaciones para TF / A5789 Areas Management and Posterior Individual Limited 8,358.00 7,621.04 Firmado 30 29 08 30 23 20 08 02 06 fortalecer la gobernanza Financial Sustainability local en la jurisdicción de CDA Guaviare en específico para la declaratoria de nueva área protegida. CO-PNF-223137-CS-INDV / Prestar sus servicios profesionales para diseñar, estructurar y formular el Component 1 - Protected Manual Operativo del 2021-06- 2021-04- 2021-08- 2021-08- 2021-09- 2022-01- TF / A5789 Areas Management and Posterior Individual 12,239.00 0.00 En ejecución Programa Herencia 30 29 07 15 05 03 Financial Sustainability Colombia, que contenga los arreglos institucionales, instancias para la toma de decisiones, herramientas de gestión. CO-PNF-223141-CS-INDV / Prestar sus servicios profesionales para realizar Component 4 - Project la preproducción, Coordination, 2021-06- 2021-04- 2021-07- 2021-08- 2021-09- 2021-12- producción y TF / B1287 Posterior Individual Open 15,821.00 0.00 En ejecución Management, Monitoring 30 29 31 08 05 04 posproducción de una serie and Evaluation (M&E) radial con información del GEF 7 en formato waw y mp3 y optimizados para fácil distribución. CO-PNF-230168-CS-INDV / Prestar sus servicios profesionales para diseñar y desarrollar los contenidos Component 4 - Project gráficos multiformato Coordination, 2021-06- 2021-04- 2021-07- 2021-04- 2021-07- 2021-05- 2021-07- 2021-06- 2022-07- requeridos para la TF / A5789 Posterior Individual Direct 30,996.00 27,549.77 Firmado Management, Monitoring 30 23 10 23 17 25 31 02 11 implementación de la and Evaluation (M&E) estrategia de comunicaciones y gestión del conocimiento de la iniciativa GEF Corazón de la Amazonia. CO-PNF-230172-CS-INDV / Prestar sus servicios profesionales para orientar el proceso de comunicación Component 4 - Project y gestión del conocimiento Coordination, 2021-06- 2021-04- 2021-07- 2021-04- 2021-07- 2021-05- 2021-07- 2021-06- 2022-07- del Proyecto GEF Corazón TF / A5789 Posterior Individual Direct 34,199.00 30,396.65 Firmado Management, Monitoring 30 23 10 26 17 25 31 02 11 de la Amazonia que permita and Evaluation (M&E) posicionar su implementación con actores estratégicos, mostrar y sistematizar avances, resultados. CO-PNF-189685-CS-INDV / Prestar servicios profesionales para apoyar el proceso de formulación del plan de manejo del Parque Component 1 - Protected 2021-06- 2021-07- 2021-07- 2021-08- 2022-08- Natural Regional Miraflores TF / A5789 Areas Management and Posterior Individual Limited 21,493.00 0.00 Cancelado 30 08 23 08 03 y Picachos y el Financial Sustainability fortalecimiento de la gobernanza local del área protegida, a través de procesos de articulación y orientación CO-PNF-200255-CS-INDV / Realizar la sustentación técnica en aspectos biofísicos de la ruta Component 1 - Protected declaratoria de área 2020-12- 2021-01- 2021-01- 2021-02- 2021-11- TF / A5789 Areas Management and Posterior Individual Limited 13,433.00 0.00 Cancelado protegida regional y apoyar 30 07 22 07 04 Financial Sustainability el proceso de construcción, validación y concertación con actores comunitarios e institucionales en áreas priorizadas por la Corporación CO-PNF-210816-CS-INDV / Prestar sus servicios profesionales para apoyar la generación y evaluación de ATD y/o extracción ilícita Component 2 - Forest 2021-03- 2021-04- 2021-04- 2021-04- 2022-03- de minerales a través del TF / A5789 Governance, Management Posterior Individual Limited 14,776.00 0.00 Cancelado 30 04 11 25 21 procesamiento digital de and Monitoring imágenes de sensores remotos en la jurisdicción de CORPOAMAZONIA en conjunto con el IDEAM. Page 13 CO-PNF-200254-CS-INDV / Prestar sus servicios profesionales para liderar y orientar la implementación de la ruta de declaratoria de Component 1 - Protected 2021-03- 2021-04- 2021-04- 2021-05- 2022-03- un área protegida regional y TF / A5789 Areas Management and Posterior Individual Limited 17,910.00 0.00 Cancelado 30 07 22 08 04 la gestión de estrategias Financial Sustainability complementarias de conservación, mediante procesos de construcción, validación CO-PNF-230181-CS-INDV / Prestar sus servicios profesionales para orientar los procesos de planificación, ordenamiento Component 3 - Sectoral 2021-06- 2021-05- 2021-07- 2021-07- 2021-08- 2022-04- ambiental y gestión del TF / A5789 Programs for Sustainable Posterior Individual Limited 10,746.00 0.00 En ejecución 30 14 08 23 08 05 turismo de naturaleza en Landscape Management áreas seleccionadas de la jurisdicción de la Corporación para el Desarrollo Sostenible del Norte y el Oriente CO-PNF-230173-CS-INDV / Brindar el soporte jurídico y político que demande la Unidad de Coordinación del Component 4 - Project Proyecto para el desarrollo Coordination, 2021-06- 2021-04- 2021-07- 2021-04- 2021-07- 2021-05- 2021-08- 2021-05- 2022-08- de los componentes del GEF TF / A5789 Posterior Individual Direct 41,069.00 37,335.08 Firmado Management, Monitoring 30 28 10 29 31 07 14 14 09 Corazón Amazonía, para el and Evaluation (M&E) manejo sostenible del paisaje, especialmente en temas relacionados con áreas protegidas. CO-PNF-234243-CS-INDV / Prestar servicios profesionales para orientar la gestión y aumento en la efectividad del manejo del Component 1 - Protected 2021-06- 2021-05- 2021-07- 2021-08- 2021-08- 2022-08- Parque Natural Regional TF / A5789 Areas Management and Posterior Individual Open 21,493.00 0.00 En ejecución 30 12 24 01 22 17 Miraflores y Picachos en el Financial Sustainability departamento de Caquetá, a través del fortalecimiento de la gobernanza local del área protegida. CO-PNF-237044-CS-INDV / Prestar sus servicios profesionales como enlace técnico y jurisdiccional en la Corporación para el Component 2 - Forest 2021-09- 2021-06- 2021-10- 2021-10- 2021-10- 2022-10- Desarrollo Sostenible del TF / A5789 Governance, Management Posterior Individual Direct 26,078.00 0.00 En ejecución 30 09 10 17 31 26 Norte y el Oriente and Monitoring Amazónico - CDA para el acompañamiento técnico al seguimiento y documentación de los procesos de planeación CO-PNF-237047-CS-INDV / Prestar sus servicios profesionales para consolidar la estrategia de Component 4 - Project gestión de riesgos del Coordination, 2021-09- 2021-06- 2021-10- 2021-11- 2021-11- 2022-09- proyecto GEF Corazón TF / A5789 Posterior Individual Open 22,388.00 0.00 En ejecución Management, Monitoring 30 18 25 01 15 11 Amazonia bajo los and Evaluation (M&E) lineamientos de Unidad de Coordinación y de la Coordinación General del Proyecto, e impulsar y orientar su implementación, e CO-PNF-237075-CS-INDV / Prestar servicios profesionales con el fin de orientar el proceso de Component 1 - Protected ordenamiento de la Reserva 2021-09- 2021-06- 2021-10- 2021-10- 2021-10- 2022-04- TF / A5789 Areas Management and Posterior Individual Direct 13,039.00 0.00 Bajo Revision Forestal de la Amazonia en 30 28 10 17 31 29 Financial Sustainability la zona del Bajo Caguán, departamento del Caquetá, como estrategia para identificar alternativas de comanejo. CO-PNF-239250-CS-INDV / Prestar sus servicios profesionales para promover la implementación de Component 3 - Sectoral 2021-09- 2021-06- 2021-11- 2021-11- 2021-12- 2022-06- actividades de manejo de TF / A5789 Programs for Sustainable Posterior Individual Open 7,164.00 0.00 En ejecución 30 17 07 15 06 04 las áreas de uso sostenible Landscape Management con sistemas de producción no tradicionales en el sitio Ramsar Estrella Fluvial Inírida en el marco del Proyecto Conservación. CO-PNF-241450-CS-INDV / Prestar sus servicios profesionales como especialista en Component 4 - Project adquisiciones, para la Coordination, Ejecución 2021-07- 2021-07- 2021-08- 2021-08- 2022-08- realización de los procesos TF / A5789 Posterior Individual Direct 37,110.00 0.00 Management, Monitoring pendiente 15 25 01 15 15 de adquisiciones y and Evaluation (M&E) contrataciones que se requieran de acuerdo con lo establecido en los Acuerdos Legales de Donación (PPG, AF y nuevo AF). Page 14