P071170- Alborz Integrated Lamd and Water Resources Management Project Procurement Plan November 20, 2011 Works Preparation Bidding Evaluation Contract Implementation Plan/Revised/Actual Contractor's Name Prior/ Post Reviews Physical Progress Sub Component Completion Completion period (M) Agency Package Proc. Bidding Eval. (%) Start Contract Description Tech. Spec. Issue Bid/PQ No. Method Doc./ PQ WB - NO SPN Report WB - NO Award Signature Compl BD/PQ Submission Compl to Bank A. Upper Watershed and Forestry Management A.1 Technical Assistance and Capacity Building A.2 Soil and Water Protection A.3 Rangeland and Forest Conservation & Management Grass Planting, Fencing P UWFM/W1 A3 MOJA Shopping Post N.A. N.A. 23-Jul-07 08-Aug-07 15-Aug-07 N.A. 22-Aug-07 22-Aug-07 12 Rouyan Kesht and Seedling of R UWFM/W1 (Lot1) MOJA Shopping Post 20-May-09 27-May-09 N.A. N.A. 03-Jun-09 17-Jun-09 N.A. N.A. 20-Jun-09 27-Jun-09 27 04-Jul-09 22-Sep-11 100 Savad Kouh Rangeland A 14-Jun-09 15-Jun-09 N.A. N.A. 17-Jun-09 04-Jul-09 N.A. N.A. 17-Aug-09 27-Oct-09 31-Oct-09 31-Jul-11 Grass Planting, Fencing P UWFM/W1 (Lot2) A3 MOJA Shopping Post 01-Mar-10 08-Mar-10 N.A. N.A. 15-Mar-10 29-Mar-10 N.A. N.A. 01-Apr-10 8-Apr-10 27 15-Apr-10 03-Jul-12 Lapour Dam and Seedling of R 80 Savad Kouh Rangeland A 15-Nov-09 12-Jan-10 N.A. N.A. 13-Jan-10 26-Jan-10 N.A. N.A. 15-Mar-10 15-May-10 20-May-10 P UWFM/W2 A2 MOJA Shopping Post N.A. N.A. 01-Dec-07 15-Dec-07 23-Dec-07 N.A. 01-Jan-08 1-Jan-08 2 Abbas Abade Maintenance of Water R UWFM/W2 (Lot1) MOJA Shopping Post 01-Aug-07 08-Aug-07 N.A. N.A. 15-Aug-07 29-Aug-07 N.A. N.A. 01-Sep-07 8-Sep-07 7 15-Sep-07 14-Sep-08 Savad Kouh 100 Sources and Structures A Shopping Post 12-Aug-07 19-Aug-07 N.A. N.A. 03-Sep-07 17-Sep-07 N.A. N.A. 20-Sep-07 9-Oct-07 11 09-Oct-07 20-Sep-08 Co. P UWFM/W2 (Lot2) A2 MOJA Shopping Post 01-Sep-09 08-Sep-09 N.A. N.A. 15-Sep-09 29-Sep-09 N.A. N.A. 02-Oct-09 9-Oct-09 3 16-Oct-09 14-Jan-10 Maintenance of Water Lapour Dam R 20-May-09 27-May-09 N.A. N.A. 03-Jun-09 17-Jun-09 N.A. N.A. 20-Jun-09 27-Jun-09 3 04-Jul-09 02-Oct-09 100 Sources and Structures Savad Kouh A 14-Jun-09 15-Jun-09 N.A. N.A. 17-Jun-09 04-Jul-09 N.A. N.A. 17-Aug-09 27-Oct-09 31-Oct-09 31-Jan-11 P UWFM/W4 A3 MOJA Shopping Post 15-Jun-07 01-Jul-07 23-Jul-07 01-Aug-07 6 Thinning of old Plantation R MOJA NCB Post 01-Jun-10 16-Jun-10 N.A. 26-Jun-10 26-Jun-10 26-Jul-10 10-Aug-10 N.A. 15-Aug-10 4-Sep-10 8 04-Oct-10 01-Jun-11 A Maintenance of Forest P UWFM/W5 A3 MOJA Shopping Post N.A. N.A. 01-Apr-07 15-Apr-07 23-Apr-07 N.A. 01-May-07 1-May-07 6 R UWFM/W5 MOJA Shopping Prior Sarouj Sazeh Roads (10 km 100 Gostar Karsangrud) A UWFM/W5 (Lot1) MOJA Shopping Prior N.A. N.A. 26-May-07 27-May-07 N.A. N.A. 06-Jun-07 6-Jun-07 15 6-Jun-07 17-Jan-09 Maintenance of Forest P UWFM/W5 (Lot2) A3 MOJA NCB Post 01-May-09 16-May-09 N.A. 26-May-09 26-May-09 25-Jun-09 10-Jul-09 N.A. 15-Jul-09 4-Aug-09 8 03-Sep-09 01-May-10 Rah Gostar Roads (20 km R 10-Jun-09 25-Jun-09 N.A. 05-Jul-09 05-Jul-09 04-Aug-09 19-Aug-09 N.A. 24-Aug-09 13-Sep-09 8 13-Oct-09 10-Jun-10 60 Khazar Ab Karsangrud) A 15-Dec-09 22-Feb-10 N.A. 02-Mar-10 02-Mar-10 06-Apr-10 04-May-10 N.A. 16-May-10 08-Jun-10 12-Jun-10 P UWFM/W5 (Lot3) A3 MOJA Shopping Post 01-May-09 08-May-09 N.A. N.A. 15-May-09 29-May-09 N.A. N.A. 01-Jun-09 8-Jun-09 7 15-Jun-09 11-Jan-10 Azar Ab Maintenance of Forest R NCB Post 30-May-09 14-Jun-09 N.A. 24-Jun-09 24-Jun-09 24-Jul-09 08-Aug-09 N.A. 13-Aug-09 2-Sep-09 8 02-Oct-09 30-May-10 Tabarestan 85 Roads (4 km Babolrud) A 06-Jun-09 15-Jun-09 N.A. 25-Jun-09 25-Jun-09 21-Jul-09 N.A. N.A. 16-Aug-09 19-Oct-09 25-Oct-09 Co. P UWFM/W5 (Lot4) A3 MOJA NCB Post 01-Dec-11 16-Dec-11 N.A. 26-Dec-11 26-Dec-11 25-Jan-12 09-Feb-12 N.A. 14-Feb-12 5-Mar-12 7 04-Apr-12 31-Oct-12 Maintenance of Forest R Roads (4 km Babolrud) A P UWFM/W6 A3 MOJA Shopping Post N.A. N.A. 01-Oct-07 15-Oct-07 23-Oct-07 N.A. 01-Nov-07 6 Nursery construction and R UWFM/W6 MOJA NCB Post 30-Dec-10 14-Jan-11 N.A. 24-Jan-11 24-Jan-11 23-Feb-11 10-Mar-11 N.A. 15-Mar-11 4-Apr-11 8 04-May-11 30-Dec-11 supply with equipment A P UWFM/W7 A3 MOJA Shopping Post 01-Oct-07 15-Oct-07 23-Oct-07 01-Nov-07 2 Forest Roads Gates (3 R UWFM/W7 MOJA Shopping Post 01-Aug-07 23-Oct-07 N.A. N.A. 30-Oct-07 13-Nov-07 N.A. N.A. 16-Nov-07 23-Nov-07 5 30-Nov-07 28-Apr-08 Gates) Cheshmeh A 16-Oct-07 05-Nov-07 19-Nov-07 N.A. N.A. 22-Nov-07 2-Dec-07 5 2-Dec-07 4-May-09 Omide 100 Shalizarhaye Forest Roads Gates Shomal Co. (Addendum No. 1)- Ad UWFM/W7-AD1 4-May-09 4-May-09 4-May-09 Revised Contract Price Buildings for Integrated P UWFM/W8 A3 MOJA Shopping Post 01-Aug-07 15-Aug-07 23-Aug-07 01-Sep-07 6 Natural Resources Management (for MNRD, R UWFM/W8 MOJA NCB Post 01-Dec-10 16-Dec-10 N.A. 26-Dec-10 26-Dec-10 25-Jan-11 09-Feb-11 N.A. 14-Feb-11 6-Mar-11 8 05-Apr-11 01-Dec-11 Cooperatives and MDOE ) A 02-Oct-11 08-Oct-11 N.A. 13-Oct-11 13-Oct-11 12-Nov-11 Structural Soil P UWFM/W9 (Lot 1) A2 MOJA Shopping Post 6 Conservation Measures R UWFM/W9 (Lot 1) MOJA Shopping Prior Sabz Moeude (Esklim rood) Ghaemshahr 100 P071170- Alborz Integrated Lamd and Water Resources Management Project Procurement Plan November 20, 2011 Works Preparation Bidding Evaluation Contract Implementation Plan/Revised/Actual Contractor's Name Prior/ Post Reviews Physical Progress Sub Component Completion Completion period (M) Agency Package Proc. Bidding Eval. (%) Start Contract Description Tech. Spec. Issue Bid/PQ No. Method Doc./ PQ WB - NO SPN Report WB - NO Award Signature Compl BD/PQ Submission Compl to Bank (Esklim rood) Ghaemshahr 100 A UWFM/W9 (Lot 1) MOJA Shopping Prior 16-May-07 19-May-07 21-May-07 03-Jun-07 3-Jun-07 8 03-Jun-07 29-Jan-08 Co. Esklimroud First UWFM/W9 (Lot 1)- addendum- Revised Ad MOJA 25-Jan-08 2 29-Jan-08 29-Mar-08 AD1 Contract Price P UWFM/W9 (Lot 2) A2 MOJA Shopping Post Structural Soil Rah Sanj Conservation Measures R UWFM/W9 (Lot 2) MOJA NCB Post 30-May-09 14-Jun-09 N.A. 24-Jun-09 24-Jun-09 24-Jul-09 08-Aug-09 N.A. 13-Aug-09 2-Sep-09 6 02-Oct-09 31-Mar-10 100 Khazar Co. (Babolak) A 06-Jun-09 15-Jun-09 N.A. 25-Jun-09 25-Jun-09 21-Jul-09 N.A. N.A. 16-Aug-09 31-Oct-09 01-Nov-09 28-Feb-11 Land Slide stabilizing and P UWFM/W16(Lot 1) A3 MOJA Shopping Post 01-Aug-07 15-Aug-07 23-Aug-07 01-Sep-07 6 construction of retaining wall in Lafourak- R UWFM/W10 MOJA NCB Post 20-Dec-10 04-Jan-11 N.A. 14-Jan-11 14-Jan-11 13-Feb-11 28-Feb-11 N.A. 05-Mar-11 25-Mar-11 6 24-Apr-11 21-Oct-11 Darzanoun forest road and rehabilitation of the second 10 Km A 02-Oct-11 08-Oct-11 N.A. 13-Oct-11 13-Oct-11 12-Nov-11 Structural soil P UWFM/W1 A2 MOJA NCB Prior 15-Sep-07 30-Sep-07 15-Oct-07 25-Oct-07 25-Oct-07 24-Nov-07 09-Dec-07 24-Dec-07 29-Dec-07 18-Jan-08 10 17-Feb-08 13-Dec-08 conservation measures R UWFM/W11 Shopping Post 01-Dec-10 08-Dec-10 N.A. N.A. 15-Dec-10 29-Dec-10 N.A. N.A. 01-Jan-11 8-Jan-11 10 15-Jan-11 11-Nov-11 (Babolakroud) A 02-Oct-11 08-Oct-11 N.A. 13-Oct-11 13-Oct-11 12-Nov-11 P UWFM/W2 A2 MOJA NCB Post 15-Sep-08 30-Sep-08 N.A. 10-Oct-08 10-Oct-08 09-Nov-08 N.A. N.A. 29-Nov-08 19-Dec-08 10 18-Jan-09 14-Nov-09 Structural soil R UWFM/W12 20-Dec-10 04-Jan-11 N.A. 14-Jan-11 14-Jan-11 13-Feb-11 28-Feb-11 N.A. 05-Mar-11 25-Mar-11 10 24-Apr-11 18-Feb-12 conservation measures A 02-Oct-11 08-Oct-11 N.A. 13-Oct-11 13-Oct-11 12-Nov-11 P UWFM/W3 A2 MOJA NCB Post 15-Sep-09 30-Sep-09 N.A. 10-Oct-09 10-Oct-09 09-Nov-09 N.A. N.A. 29-Nov-09 19-Dec-09 10 18-Jan-10 14-Nov-10 Structural soil R UWFM/W13 20-Feb-11 07-Mar-11 N.A. 17-Mar-11 17-Mar-11 16-Apr-11 01-May-11 N.A. 06-May-11 26-May-11 10 25-Jun-11 20-Apr-12 conservation measures A P UWFM/W4 A2 MOJA NCB Post 15-Sep-10 30-Sep-10 N.A. 10-Oct-10 10-Oct-10 09-Nov-10 N.A. N.A. 29-Nov-10 19-Dec-10 10 18-Jan-11 14-Nov-11 Structural soil R UWFM/W14 20-Feb-11 07-Mar-11 NA 17-Mar-11 17-Mar-11 16-Apr-11 01-May-11 NA 06-May-11 26-May-11 10 25-Jun-11 20-Apr-12 conservation measures A P UWFM/W5 A2 MOJA NCB Post 15-Sep-07 30-Sep-07 N.A. 10-Oct-07 10-Oct-07 09-Nov-07 N.A. N.A. 29-Nov-07 19-Dec-07 10 18-Jan-08 13-Nov-08 Twig Check dams/ R UWFM/W15 20-Feb-11 07-Mar-11 NA 17-Mar-11 17-Mar-11 16-Apr-11 01-May-11 NA 06-May-11 26-May-11 10 25-Jun-11 20-Apr-12 vegetative measurea A P UWFM/W6 A2 MOJA NCB Post 15-Sep-08 30-Sep-08 N.A. 10-Oct-08 10-Oct-08 09-Nov-08 N.A. N.A. 29-Nov-08 19-Dec-08 10 18-Jan-09 14-Nov-09 Twig Check dams/ R UWFM/W16 20-Feb-11 07-Mar-11 NA 17-Mar-11 17-Mar-11 16-Apr-11 01-May-11 NA 06-May-11 26-May-11 10 25-Jun-11 20-Apr-12 vegetative measures A P UWFM/W7 A2 MOJA NCB Post 15-Sep-09 30-Sep-09 N.A. 10-Oct-09 10-Oct-09 09-Nov-09 N.A. N.A. 29-Nov-09 19-Dec-09 10 18-Jan-10 14-Nov-10 Twig Check dams/ R UWFM/W17 20-Feb-11 07-Mar-11 NA 17-Mar-11 17-Mar-11 16-Apr-11 01-May-11 NA 06-May-11 26-May-11 10 25-Jun-11 20-Apr-12 vegetative measures A P UWFM/W22 A3 MOJA NCB Post 01-May-08 16-May-08 N.A. 26-May-08 26-May-08 25-Jun-08 N.A. N.A. 15-Jul-08 4-Aug-08 10 03-Sep-08 30-Jun-09 Rehabilitation of degraded Karsang Roud forests in Karsang Roud R UWFM/W29 A3 Shopping Post 23-Sep-08 30-Sep-08 N.A. N.A. 07-Oct-08 21-Oct-08 N.A. N.A. 24-Oct-08 31-Oct-08 6 07-Nov-08 06-May-09 100 Cooperative Zone A UWFM/W29 A3 MOJA Shopping Post 10-Nov-08 10-Jan-09 N.A. N.A. 14-Jan-09 28-Jan-09 N.A. N.A. 03-Mar-09 03-Mar-09 27 03-Mar-09 21-Jun-11 P UWFM/W23 A3 MOJA NCB Post 01-May-09 16-May-09 N.A. 26-May-09 26-May-09 25-Jun-09 N.A. N.A. 15-Jul-09 4-Aug-09 10 03-Sep-09 30-Jun-10 Rehabilitation of degraded Karsang Roud R UWFM/W30 MOJA Shopping Post 20-Feb-11 27-Feb-11 N.A. N.A. 06-Mar-11 20-Mar-11 N.A. N.A. 23-Mar-11 30-Mar-11 6 06-Apr-11 03-Oct-11 70 forests Cooperative A 29-Jan-10 07-Feb-10 N.A. N.A. 08-Feb-10 21-Feb-10 N.A. N.A. 28-Mar-10 15-May-10 20-May-10 Maintenance and P UWFM/W31 A3 MOJA NCB Post 20-Feb-10 07-Mar-10 N.A. 17-Mar-10 17-Mar-10 16-Apr-10 N.A. N.A. 06-May-10 26-May-10 10 25-Jun-10 21-Apr-11 Competition of Ghozak R NCB Post 20-Dec-10 04-Jan-11 N.A. 14-Jan-11 14-Jan-11 13-Feb-11 28-Feb-11 N.A. 05-Mar-11 25-Mar-11 10 24-Apr-11 18-Feb-12 Roudbar Access on Forest Road A 02-Oct-11 08-Oct-11 N.A. 13-Oct-11 13-Oct-11 12-Nov-11 P071170- Alborz Integrated Lamd and Water Resources Management Project Procurement Plan November 20, 2011 Works Preparation Bidding Evaluation Contract Implementation Plan/Revised/Actual Contractor's Name Prior/ Post Reviews Physical Progress Sub Component Completion Completion period (M) Agency Package Proc. Bidding Eval. (%) Start Contract Description Tech. Spec. Issue Bid/PQ No. Method Doc./ PQ WB - NO SPN Report WB - NO Award Signature Compl BD/PQ Submission Compl to Bank Improvment of Eco P UWFM/W32 A3 MOJA NCB Post 20-Feb-10 07-Mar-10 N.A. 17-Mar-10 17-Mar-10 16-Apr-10 N.A. N.A. 06-May-10 26-May-10 10 25-Jun-10 21-Apr-11 Tourisem Places (Gazou R NCB Post 01-Dec-11 16-Dec-11 N.A. 26-Dec-11 26-Dec-11 25-Jan-12 09-Feb-12 N.A. 14-Feb-12 5-Mar-12 7 04-Apr-12 31-Oct-12 Waterfall) A P UWFM/W38 A3 MOJA NCB Post 01-Oct-08 18-Dec-08 N.A. 28-Dec-08 28-Dec-08 27-Jan-09 N.A. N.A. 16-Feb-09 8-Mar-09 10 07-Apr-09 01-Feb-10 Tavana Sazeh Construction of 2.7 km of R Savad Kouh 100 access road A NCB Post 03-Dec-08 25-Jan-09 NA 04-Feb-09 04-Feb-09 01-Mar-09 NA NA 04-Mar-09 28-Apr-09 28-Apr-09 12-Jan-11 Co. Ad UWFM/W38-AD1 12-Jan-11 12-Jan-11 P UWFM/W39 A3 MOJA NCB Post 01-May-09 16-May-09 N.A. 26-May-09 26-May-09 25-Jun-09 N.A. N.A. 15-Jul-09 4-Aug-09 10 03-Sep-09 30-Jun-10 Reforestation of forest R NCB Post 20-Dec-10 04-Jan-11 N.A. 14-Jan-11 14-Jan-11 13-Feb-11 N.A. N.A. 05-Mar-11 25-Mar-11 10 24-Apr-11 18-Feb-12 cleaning (300Ha) A Construction of 6.9 km of P UWFM/W40 A3 MOJA NCB Post 01-May-09 16-May-09 N.A. 26-May-09 26-May-09 25-Jun-09 N.A. N.A. 15-Jul-09 4-Aug-09 9 03-Sep-09 31-May-10 Chakal Sazeh Forest access road and R 30-May-09 16-May-09 N.A. 26-May-09 26-May-09 25-Jun-09 N.A. N.A. 01-Nov-09 21-Nov-09 9 21-Dec-09 17-Sep-10 60 Mazeroun Co. Bridges (Karsangrud) A 09-Jun-09 09-Sep-09 N.A. 24-Sep-09 24-Sep-09 27-Oct-09 N.A. N.A. 03-Mar-10 13-Apr-10 26-Apr-10 P UWFM/W41 A3 MOJA NCB Post 01-May-09 17-Jun-09 N.A. 27-Jun-09 27-Jun-09 27-Jul-09 N.A. N.A. 16-Aug-09 5-Sep-09 9 05-Oct-09 02-Jul-10 Omran Tose Construction of 3 km of R 20-May-09 16-May-10 N.A. 26-May-10 26-May-10 25-Jun-10 N.A. N.A. 15-Jul-10 4-Aug-10 9 03-Sep-10 31-May-11 Paydar Alborz 90 access road (Babolrud) Co. A 02-Jun-09 10-Jun-09 N.A. 09-Aug-09 09-Aug-09 08-Sep-09 N.A. N.A. 02-Nov-09 22-Dec-09 28-Dec-09 P UWFM/W42 A3 MOJA NCB Post 01-May-10 15-Jan-00 N.A. 25-Jan-00 25-Jan-00 24-Feb-00 N.A. N.A. 15-Mar-00 4-Apr-00 10 04-May-00 28-Feb-01 Construction of Forest R MOJA NCB Prior 07-Sep-10 22-Sep-10 07-Oct-10 17-Oct-10 17-Oct-10 16-Nov-10 01-Dec-10 16-Dec-10 21-Dec-10 10-Jan-11 12 09-Feb-11 04-Feb-12 access road A Fencing in forests P UWFM/W43 A3 MOJA NCB Post 01-May-10 16-May-10 N.A. 26-May-10 26-May-10 25-Jun-10 N.A. N.A. 15-Jul-10 4-Aug-10 10 03-Sep-10 30-Jun-11 (Protection and Natural R MOJA NCB Post 20-Feb-11 07-Mar-11 N.A. 17-Mar-11 17-Mar-11 16-Apr-11 N.A. N.A. 06-May-11 26-May-11 10 25-Jun-11 20-Apr-12 Resources Management) A P UWFM/W44 A3 MOJA NCB Post 07-Sep-10 22-Sep-10 N.A. 02-Oct-10 02-Oct-10 01-Nov-10 N.A. N.A. 21-Nov-10 11-Dec-10 10 10-Jan-11 06-Nov-11 Rehabilitation of forest R road A 02-Oct-11 08-Oct-11 N.A. 13-Oct-11 13-Oct-11 12-Nov-11 P UWFM/W45 A2 MOJA NCB Post 20-Oct-10 04-Nov-10 N.A. 14-Nov-10 14-Nov-10 14-Dec-10 N.A. N.A. 03-Jan-11 23-Jan-11 10 22-Feb-11 19-Dec-11 Rangeland protection R NCB Post 20-Jan-11 04-Feb-11 N.A. 14-Feb-11 14-Feb-11 16-Mar-11 N.A. N.A. 05-Apr-11 25-Apr-11 16 25-May-11 16-Sep-12 measures (100 ha) A 02-Oct-11 08-Oct-11 N.A. 13-Oct-11 13-Oct-11 12-Nov-11 P UWFM/W46 A3 MOJA NCB Post 20-Oct-10 04-Nov-10 N.A. 14-Nov-10 14-Nov-10 14-Dec-10 N.A. N.A. 03-Jan-11 23-Jan-11 10 22-Feb-11 19-Dec-11 Construction of nursery R A Subtotal MOJA Subtotal MRWC Total Both PIUs P071170- Alborz Integrated Lamd and Water Resources Management Project Procurement Plan November 20, 2011 Works Preparation Bidding Evaluation Contract Implementation Plan/Revised/Actual Contractor's Name Prior/ Post Reviews Physical Progress Sub Component Completion Completion period (M) Agency Package Proc. Bidding Eval. (%) Start Contract Description Tech. Spec. Issue Bid/PQ No. Method Doc./ PQ WB - NO SPN Report WB - NO Award Signature Compl BD/PQ Submission Compl to Bank B. Irrigation and Drainage Management B.1 Rehabilitation and Development of Irrigation and Drinage Systems B.2 Institutional Support for WUA Establishment B.3 Agricultural Extension and Research Activities Babol Right Bank P IDM/W101 B1 MRWC ICB Prior 01-Apr-09 01-Jun-09 01-Jul-09 01-Aug-09 30 Koumeh Saz Traditional I&D System R IDM/W101 MRWC ICB Prior 06-Apr-10 26-Apr-10 04-Aug-10 14-Aug-10 14-Aug-10 13-Oct-10 28-Oct-10 12-Nov-10 17-Nov-10 7-Dec-10 18 06-Jan-11 29-Jun-12 4 Aras (B1) A 06-Jul-10 20-Jul-10 23-Jul-10 19-Aug-10 19-Aug-10 28-Sep-10 16-Feb-11 18-Feb-11 28-Feb-11 09-Apr-11 09-Apr-11 Talar Left Bank P IDM/W102 B1 MRWC ICB Prior 01-Jan-09 01-Mar-09 01-Apr-09 01-May-09 33 Traditional I&D System R IDM/W102 MRWC ICB Prior 06-Apr-10 26-Apr-10 04-Aug-10 14-Aug-10 14-Aug-10 13-Oct-10 28-Oct-10 12-Nov-10 17-Nov-10 7-Dec-10 18 06-Jan-11 29-Jun-12 Darven 6 (B2) A 06-Jul-10 20-Jul-10 23-Jul-10 19-Aug-10 19-Aug-10 28-Sep-10 16-Feb-11 06-Apr-11 07-Apr-11 01-May-11 01-May-11 Talar Right Bank P IDM/W103 B1 MRWC ICB Prior 01-Oct-08 01-Dec-08 01-Jan-09 01-Feb-09 24 Pars Garma Traditional I&D System R IDM/W103 MRWC ICB Prior 06-Apr-10 26-Apr-10 31-Jul-10 10-Aug-10 10-Aug-10 09-Oct-10 28-Oct-10 12-Nov-10 17-Nov-10 7-Dec-10 18 06-Jan-11 29-Jun-12 5 Co. (B3) A 06-Jul-10 16-Jul-10 23-Jul-10 19-Aug-10 19-Aug-10 28-Sep-10 16-Feb-11 18-Feb-11 28-Feb-11 11-Apr-11 11-Apr-11 P IDM/W201 B1 MRWC ICB Prior 01-Sep-05 15-Oct-05 31-Dec-05 01-May-06 30 Main Conveyance Canal R IDM/W201 MRWC ICB Prior Choulab Co. 100 III A IDM/W201 MRWC ICB Prior 18-Jul-05 18-Jul-05 19-Sep-05 21-Dec-05 31-Dec-05 02-Feb-06 30 02-Feb-06 22-Sep-09 Raeiskola System Weir, P IDM/W202 B1 MRWC ICB Prior 02-Aug-06 24-Sep-06 02-Dec-06 01-Apr-07 30 Canals and Drains Gohar Roude R IDM/W202 MRWC ICB Prior 90 (including two non-project Gilan Co. river check structures) A IDM/W202 MRWC ICB Prior 12-Jun-06 02-Jul-06 17-Jul-06 02-Aug-06 24-Sep-06 01-Dec-06 07-Dec-06 01-Jan-07 11-Jan-07 30 11-Jan-07 26-Jul-06 P IDM/W203 B1 MRWC ICB Prior 31-Mar-07 15-May-07 15-Jun-07 15-Jul-07 18 Halidasht Pumping Station Bastian & No R ICB Prior 07-Jul-08 22-Jul-08 28-Aug-08 30-Nov-08 30-Nov-08 30-Dec-08 23-Mar-09 11-Jun-09 09-Jun-09 29-Jun-09 18 29-Jul-09 20-Jan-11 100 Systems Gostaran JV A 19-Jul-08 13-Aug-08 20-Nov-08 19-Jan-09 19-Jan-09 08-Mar-09 27-May-09 04-Jun-09 16-Jun-09 19-Jul-09 22-Jul-09 Main New Canals and P IDM/W204 MRWC ICB Prior 28-Feb-07 20-Mar-07 04-Apr-07 14-Apr-07 14-Apr-07 13-Jun-07 13-Jul-07 28-Jul-07 02-Aug-07 22-Aug-07 30 21-Sep-07 09-Mar-10 Pars Garma Drain System (C24,C25 R ICB 01-Feb-09 21-Feb-09 23-Apr-09 NA 03-May-09 02-Jul-09 11-Nov-09 26-Nov-09 01-Dec-09 27-Feb-10 24 29-Mar-10 18-Mar-12 22 Co. & MD2) A 01-Feb-09 08-Apr-09 22-Aug-09 24-Aug-09 24-Aug-09 27-Oct-09 17-Jan-10 30-Jan-10 07-Feb-10 17-Mar-10 17-Mar-10 Talar Right Bank New P IDM/W205 MRWC ICB Prior 01-Oct-08 21-Oct-08 05-Nov-08 15-Nov-08 15-Nov-08 14-Jan-09 13-Feb-09 28-Feb-09 05-Mar-09 25-Mar-09 36 24-Apr-09 08-Apr-12 R ICB 15-Feb-09 07-Mar-09 06-Jun-09 NA 16-Jun-09 31-Jul-09 12-Oct-09 27-Oct-09 01-Nov-09 11-Nov-09 30 11-Dec-09 29-May-12 Ab-o Khak I&D Prim. & Sec. 17 Keshvar Co. Systems A 07-May-09 27-May-09 09-Jul-09 22-Jul-09 22-Jul-09 22-Sep-09 16-Nov-09 17-Dec-09 23-Dec-09 17-Mar-10 17-Mar-10 P IDM/W206 B1 MRWC PQ Prior 31-Aug-07 20-Sep-07 05-Oct-07 15-Oct-07 15-Oct-07 14-Dec-07 13-Jan-08 28-Jan-08 _ _ - _ _ R NA 01-Nov-08 15-Mar-10 25-Mar-10 25-Mar-10 09-May-10 19-May-10 29-May-10 _ _ - _ _ Siah left Bank New I&D A 18-Aug-08 18-Aug-08 Prim. & Sec. Systems P IDM/W206 MRWC ICB Prior 01-Oct-08 18-Jan-08 02-Feb-08 12-Feb-08 12-Feb-08 12-Apr-08 12-May-08 27-May-08 01-Jun-08 21-Jun-08 36 21-Jul-08 06-Jul-11 R ICB 19-May-10 08-Jun-10 23-Jun-10 NA 03-Jul-10 01-Sep-10 01-Oct-10 16-Oct-10 21-Oct-10 10-Nov-10 20 10-Dec-10 01-Aug-12 A Talar Right Bank I&D P IDM/W301 a B1 MOJA ICB Prior 15-Feb-08 06-Mar-08 21-Mar-08 31-Mar-08 31-Mar-08 30-May-08 29-Jun-08 14-Jul-08 19-Jul-08 8-Aug-08 30 07-Sep-08 24-Feb-11 Ab-o Khak Tertiary Systems (Upper R IDM/W301 ICB Prior 03-May-09 13-Jun-09 28-Jun-09 08-Jul-09 08-Jul-09 06-Sep-09 31-Dec-09 15-Jan-10 20-Jan-10 9-Feb-10 24 11-Mar-10 29-Feb-12 15 Keshvar Co. and Lower) A 24-May-09 02-Sep-09 14-Sep-09 14-Sep-09 06-Oct-09 01-Dec-09 12-Jan-10 11-Feb-10 16-Feb-10 15-Mar-10 14-Apr-10 Siah left Bank New I&D P IDM/W302 a MOJA ICB Prior 28-Feb-09 20-Mar-09 04-Apr-09 14-Apr-09 14-Apr-09 13-Jun-09 13-Jul-09 28-Jul-09 02-Aug-09 22-Aug-09 30 21-Sep-09 09-Mar-12 Teritiary Systems (Upper R IDM/W302 27-Nov-09 17-Dec-09 01-Jan-10 11-Jan-10 11-Jan-10 12-Mar-10 11-Apr-10 26-Apr-10 01-May-10 21-May-10 24 20-Jun-10 09-Jun-12 and Lower) A 20-Jan-10 20-Jan-10 26-Feb-10 04-Mar-10 04-Mar-10 04-May-10 Talar Upper Right Bank P IDM/W303a B1 MOJA ICB Prior 14-Feb-09 06-Mar-09 21-Mar-09 31-Mar-09 31-Mar-09 30-May-09 29-Jun-09 14-Jul-09 19-Jul-09 8-Aug-09 30 07-Sep-09 24-Feb-12 New Quat. & On-Farm R ICB 07-Sep-10 27-Sep-10 12-Oct-10 22-Oct-10 22-Oct-10 21-Dec-10 20-Jan-11 04-Feb-11 09-Feb-11 1-Mar-11 20 31-Mar-11 20-Nov-12 Systems A Talar lower Right Bank P IDM/W303b B1 MOJA ICB Prior 14-Feb-09 06-Mar-09 21-Mar-09 31-Mar-09 31-Mar-09 30-May-09 29-Jun-09 14-Jul-09 19-Jul-09 8-Aug-09 30 07-Sep-09 24-Feb-12 New Quat. & On-Farm R ICB 07-Apr-10 27-Apr-10 12-May-10 22-May-10 22-May-10 21-Jul-10 20-Aug-10 04-Sep-10 09-Sep-10 29-Sep-10 20 29-Oct-10 20-Jun-12 Systems A Siah Upper Left Bank P IDM/W304a B1 MOJA ICB Prior 14-Feb-09 06-Mar-09 21-Mar-09 31-Mar-09 31-Mar-09 30-May-09 29-Jun-09 14-Jul-09 19-Jul-09 8-Aug-09 30 07-Sep-09 24-Feb-12 New Quat. & On-Farm R ICB 07-Apr-10 27-Apr-10 12-May-10 22-May-10 22-May-10 21-Jul-10 20-Aug-10 04-Sep-10 09-Sep-10 29-Sep-10 20 29-Oct-10 20-Jun-12 Systems A Siah Lower Left Bank P IDM/W304b B1 MOJA ICB Prior 02-Feb-09 22-Feb-09 09-Mar-09 19-Mar-09 19-Mar-09 18-May-09 17-Jun-09 02-Jul-09 07-Jul-09 27-Jul-09 30 26-Aug-09 12-Feb-12 New Quat. & On-Farm R ICB 07-Apr-10 27-Apr-10 12-May-10 22-May-10 22-May-10 21-Jul-10 20-Aug-10 04-Sep-10 09-Sep-10 29-Sep-10 20 29-Oct-10 20-Jun-12 Systems A Small Pilot Works for P IDM/W401 B1 MOJA NCB Prior 24-Sep-07 09-Oct-07 N.A. 19-Oct-07 19-Oct-07 18-Nov-07 N.A. N.A. 08-Dec-07 28-Dec-07 6 27-Jan-08 25-Jul-08 Design Option R NCB 05-May-09 20-May-09 19-Feb-10 26-Feb-10 26-Feb-10 28-Mar-10 12-Apr-10 27-Apr-10 02-May-10 22-May-10 12 21-Jun-10 16-Jun-11 Assessments (Sub- Surface Drainage, 500 ha) A 14-Jun-09 15-Jun-09 Pilot New Area Farm- P IDM/W402a B1 MOJA ICB Prior 24-Sep-07 14-Oct-07 29-Oct-07 08-Nov-07 08-Nov-07 07-Jan-08 06-Feb-08 21-Feb-08 26-Feb-08 17-Mar-08 12 16-Apr-08 11-Apr-09 Level Systems R IDM/W402a (Lot 1) NCB 01-Apr-10 21-Apr-10 06-May-10 16-May-10 16-May-10 15-Jul-10 14-Aug-10 29-Aug-10 03-Sep-10 23-Sep-10 12 23-Oct-10 18-Oct-11 (500 ha) A P071170- Alborz Integrated Lamd and Water Resources Management Project Procurement Plan November 20, 2011 Works Preparation Bidding Evaluation Contract Implementation Plan/Revised/Actual Contractor's Name Prior/ Post Reviews Physical Progress Sub Component Completion Completion period (M) Agency Package Proc. Bidding Eval. (%) Start Contract Description Tech. Spec. Issue Bid/PQ No. Method Doc./ PQ WB - NO SPN Report WB - NO Award Signature Compl BD/PQ Submission Compl to Bank Pilot New Area Farm- P IDM/W402a (Lot 2) B1 MOJA NCB Prior 01-Apr-10 21-Apr-10 06-May-10 16-May-10 16-May-10 15-Jul-10 14-Aug-10 29-Aug-10 03-Sep-10 23-Sep-10 12 23-Oct-10 18-Oct-11 Level Systems R (500 ha) A Pilot Traditional Area P IDM/W402b (Lot 1) B1 MOJA ICB Prior 17-Dec-09 06-Jan-10 21-Jan-10 31-Jan-10 31-Jan-10 01-Apr-10 01-May-10 16-May-10 21-May-10 10-Jun-10 24 10-Jul-10 29-Jun-12 Farm-Level Systems (250 R NCB Post 01-Dec-11 16-Dec-11 N.A. 26-Dec-11 26-Dec-11 25-Jan-12 N.A. N.A. 14-Feb-12 5-Mar-12 7 04-Apr-12 31-Oct-12 ha) in Qaemshahr A P IDM/W402b (Lot 2) B1 MOJA NCB Prior 01-Dec-07 16-Dec-07 31-Dec-07 10-Jan-08 10-Jan-08 09-Feb-08 24-Feb-08 10-Mar-08 15-Mar-08 4-Apr-08 13 04-May-08 29-May-09 Land Consolidation in R NCB 16-Jun-08 01-Jul-08 16-Jul-08 23-Jul-08 23-Jul-08 22-Aug-08 06-Sep-08 21-Sep-08 26-Sep-08 16-Oct-08 12 15-Nov-08 10-Nov-09 Qaemshahr A NCB 23-Jun-08 01-Jul-08 27-Oct-08 30-Oct-08 30-Oct-08 24-Nov-08 29-Nov-08 10-Dec-08 14-Dec-08 04-Jan-09 04-Jan-09 Paya Khak Land Consolidation in 90 Gostar Co. Qaemshahr First IDM/W402b (Lot 2)- Ad MOJA 07-Jul-09 addendum-Revised AD1 Contract Price P IDM/W402b (Lot 3) B1 MOJA NCB Prior 01-Dec-07 16-Dec-07 31-Dec-07 10-Jan-08 10-Jan-08 09-Feb-08 24-Feb-08 10-Mar-08 15-Mar-08 4-Apr-08 13 04-May-08 29-May-09 Land Consolidation in R NCB 16-Jun-08 01-Jul-08 16-Jul-08 23-Jul-08 23-Jul-08 22-Aug-08 06-Sep-08 21-Sep-08 26-Sep-08 16-Oct-08 12 15-Nov-08 10-Nov-09 Babol A NCB 23-Jun-08 01-Jul-08 10-Sep-08 23-Sep-08 23-Sep-08 11-Oct-08 15-Oct-08 16-Oct-08 19-Oct-08 26-Nov-08 26-Nov-08 Bahnamir Co. 98 Land Consolidation in IDM/W402b (Lot 3)- Babol First addendum- Ad MOJA 20-Jul-09 AD1 Revised Contract Price P IDM/W402b (Lot 4) B1 MOJA NCB Prior 01-Dec-07 16-Dec-07 31-Dec-07 10-Jan-08 10-Jan-08 09-Feb-08 24-Feb-08 10-Mar-08 15-Mar-08 4-Apr-08 13 04-May-08 29-May-09 Land Consolidation in Paland Sazan R NCB 16-Jun-08 01-Jul-08 16-Jul-08 23-Jul-08 23-Jul-08 22-Aug-08 06-Sep-08 21-Sep-08 26-Sep-08 16-Oct-08 12 15-Nov-08 10-Nov-09 100 Babolsar Co. A NCB 23-Jun-08 01-Jul-08 10-Sep-08 23-Sep-08 23-Sep-08 11-Oct-08 15-Oct-08 05-Nov-08 09-Nov-08 06-Dec-08 06-Dec-08 20-Apr-10 Dredging of Abbandans P IDM/W402b (Lot 6) B1 MOJA Shopping Post 01-Dec-07 08-Dec-07 N.A. N.A. 15-Dec-07 29-Dec-07 N.A. N.A. 01-Jan-08 8-Jan-08 6 15-Jan-08 13-Jul-08 including: Siahkola R Tir Sotone Mahaleh and Kapourchal A Shopping Post 02-Dec-08 09-Dec-08 10-Dec-07 03-Jan-08 30-Jan-08 13-May-08 8 13-May-08 100 Khazar Co. Dredging of Abbandans IDM/W402b (Lot 6)- Ad MOJA 6-Sep-08 17 6-Sep-08 22-Oct-09 First addendum-Revised AD1 Dredging of Abbandans P IDM/W402b (Lot 7) B1 MOJA Shopping Post 01-Dec-07 08-Dec-07 N.A. N.A. 15-Dec-07 29-Dec-07 N.A. N.A. 01-Jan-08 8-Jan-08 6 15-Jan-08 13-Jul-08 including: Ziarkola and R Douk A Shopping Post 02-Dec-08 09-Dec-08 10-Dec-07 03-Jan-08 30-Jan-08 12-May-08 4-Jul-09 Mirabe Shomal 100 Dredging of Abbandans IDM/W402b (Lot 7)- Co. Ad MOJA 6-Sep-08 4-Jul-09 First addendum AD1 Dredging of Abbandans IDM/W402b (Lot 7)- Ad MOJA 4-Jul-09 4-Jul-09 05-Jul-09 Second addendum- AD2 Dredging of Abbandans P IDM/W402b (Lot 8) B1 MOJA Shopping Post 01-Dec-07 08-Dec-07 N.A. N.A. 15-Dec-07 29-Dec-07 N.A. N.A. 01-Jan-08 8-Jan-08 6 15-Jan-08 13-Jul-08 including: Tanbala and R Pol Shibe Astarabad Mahaleh A Shopping Post 02-Dec-08 09-Dec-08 10-Dec-07 03-Jan-08 30-Jan-08 13-May-08 8 13-May-08 Mazandaran 100 Dredging of Abbandans IDM/W402b (Lot 8)- Co. Ad MOJA 6-Sep-08 17 6-Sep-08 22-Oct-09 First addendum-Revised AD1 Dredging of Abbandans P IDM/W402b (Lot 9) B1 MOJA Shopping Post 01-Dec-07 08-Dec-07 N.A. N.A. 15-Dec-07 29-Dec-07 N.A. N.A. 01-Jan-08 8-Jan-08 6 15-Jan-08 13-Jul-08 including: Aznova and R Khordsar A Shopping Post 02-Dec-08 09-Dec-08 10-Dec-07 03-Jan-08 20-Jan-08 12-May-08 4-Jul-09 Sarmad Saraye 100 Dredging of Abbandans IDM/W402b (Lot 9)- Sari Co. Ad MOJA 6-Sep-08 4-Jul-09 First addendum AD1 Dredging of Abbandans IDM/W402b (Lot 9)- Ad MOJA 4-Jul-09 4-Jul-09 28-Jun-09 Second addendum- AD2 P IDM/W402b (Lot B1 MOJA Shopping Post 01-Dec-07 08-Dec-07 N.A. N.A. 15-Dec-07 29-Dec-07 N.A. N.A. 01-Jan-08 8-Jan-08 6 15-Jan-08 13-Jul-08 Dredging of Kaleh Bon 10) R Abbandan A Shopping Post 27-Jan-08 02-Feb-08 03-Feb-08 18-Feb-08 05-Mar-08 13-May-08 8 Omidane 100 Dredging of Abbandans IDM/W402b (Lot Shomal Co. Ad MOJA 6-Sep-08 17 First addendum 10)-AD1 Dredging of Abbandans IDM/W402b (Lot Ad MOJA 28-Jun-09 30-Jun-09 21-Mar-09 Second addendum- 10)-AD2 P IDM/W402b (Lot B1 MOJA Shopping Post 01-Nov-09 08-Nov-09 N.A. N.A. 15-Nov-09 29-Nov-09 N.A. N.A. 02-Dec-09 9-Dec-09 6 16-Dec-09 14-Jun-10 Mirab Land Consolidation in 11) R Tabarestan 100 Savadkouh (Dehkalan) A 13-Nov-09 13-Dec-09 N.A. N.A. 13-Dec-09 30-Dec-09 N.A. N.A. 17-Jan-10 23-Feb-10 27-Feb-10 28-Mar-11 Co. Pilot New Area Farm- P IDM/W403 B1 MOJA NCB Prior 08-Jan-09 23-Jan-09 07-Feb-09 17-Feb-09 17-Feb-09 19-Mar-09 03-Apr-09 18-Apr-09 23-Apr-09 13-May-09 24 12-Jun-09 02-Jun-11 Level I & D Systems R IDM/W403 (Lot1) NCB Prior 25-Jun-10 10-Jul-10 25-Jul-10 04-Aug-10 04-Aug-10 03-Sep-10 18-Sep-10 03-Oct-10 08-Oct-10 28-Oct-10 24 27-Nov-10 16-Nov-12 (500 ha) A Pilot New Area Farm- P IDM/W403 B1 MOJA NCB Prior 08-Jan-09 23-Jan-09 07-Feb-09 17-Feb-09 17-Feb-09 19-Mar-09 03-Apr-09 18-Apr-09 23-Apr-09 13-May-09 24 12-Jun-09 02-Jun-11 Level I & D Systems R IDM/W403 (Lot 2) NCB Prior 25-Jun-10 10-Jul-10 25-Jul-10 04-Aug-10 04-Aug-10 03-Sep-10 18-Sep-10 03-Oct-10 08-Oct-10 28-Oct-10 24 27-Nov-10 16-Nov-12 (500 ha) A P Ir&Dr/CW2 B2 MOJA NCB Post 03-May-09 23-May-09 N.A. 02-Jun-09 02-Jun-09 02-Jul-09 N.A. N.A. 22-Jul-09 11-Aug-09 24 10-Sep-09 31-Aug-11 Construction of Central P071170- Alborz Integrated Lamd and Water Resources Management Project Procurement Plan November 20, 2011 Works Preparation Bidding Evaluation Contract Implementation Plan/Revised/Actual Contractor's Name Prior/ Post Reviews Physical Progress Sub Component Completion Completion period (M) Agency Package Proc. Bidding Eval. (%) Start Contract Description Tech. Spec. Issue Bid/PQ No. Method Doc./ PQ WB - NO SPN Report WB - NO Award Signature Compl BD/PQ Submission Compl to Bank Construction of Central R IDM/W404 NCB Post 01-Jun-09 16-Jun-09 N.A. 26-Jun-09 26-Jun-09 26-Jul-09 N.A. N.A. 15-Nov-09 5-Dec-09 12 04-Jan-10 30-Dec-10 WUAs Office Tir Sotoun A 19-Sep-09 04-Oct-09 N.A. 10-Oct-09 10-Oct-09 10-Nov-09 N.A. N.A. 11-Jan-10 18-Feb-10 21-Feb-10 100 Ashianeh Co. Construction of Central Ad IDM/W404-AD MOJA 21-Aug-11 WUAs Office addendum- P Ir&Dr/CW2 B1 MOJA NCB Post 03-May-09 23-May-09 N.A. 02-Jun-09 02-Jun-09 02-Jul-09 N.A. N.A. 22-Jul-09 11-Aug-09 24 10-Sep-09 31-Aug-11 Small pilot Works (Geo- R IDM/W405 NCB Post 01-Dec-11 16-Dec-11 N.A. 26-Dec-11 26-Dec-11 25-Jan-12 N.A. N.A. 14-Feb-12 5-Mar-12 7 04-Apr-12 31-Oct-12 membrane) A Rehabilitation and P IDM/W406 B1 MOJA NCB Post 23-May-09 07-Jun-09 N.A. 17-Jun-09 17-Jun-09 17-Jul-09 N.A. N.A. 06-Aug-09 26-Aug-09 12 25-Sep-09 20-Sep-10 Improvement of Water Takvin Bana R IDM/W406 (Lot 1) Shopping Post 10-Aug-09 17-Aug-09 N.A. N.A. 24-Aug-09 07-Sep-09 N.A. N.A. 27-Oct-09 3-Nov-09 4 10-Nov-09 10-Mar-10 100 Recourses (Darikande Shomal Co. Pumping Station) A 10-Aug-09 10-Aug-09 N.A. N.A. 01-Oct-09 24-Oct-09 N.A. N.A. 20-Nov-09 21-Dec-09 28-Dec-09 26-Feb-11 Rehabilitation and P IDM/W406 B1 MOJA NCB Post 23-May-09 07-Jun-09 N.A. 17-Jun-09 17-Jun-09 17-Jul-09 N.A. N.A. 06-Aug-09 26-Aug-09 12 25-Sep-09 20-Sep-10 Mirab Improvement of Water R IDM/W406 (Lot 2) Shopping Post 10-Aug-09 17-Aug-09 N.A. N.A. 24-Aug-09 07-Sep-09 N.A. N.A. 27-Oct-09 3-Nov-09 4 10-Nov-09 10-Mar-10 Tabarestan 100 Recourses (Bagher Tange Co. Dredging of Ab Bandan) A 10-Aug-09 10-Aug-09 N.A. N.A. 01-Oct-09 24-Oct-09 N.A. N.A. 11-Nov-09 21-Dec-09 28-Dec-09 28-Dec-10 Rehabilitation and P IDM/W406 B1 MOJA NCB Post 23-May-09 07-Jun-09 N.A. 17-Jun-09 17-Jun-09 17-Jul-09 N.A. N.A. 06-Aug-09 26-Aug-09 12 25-Sep-09 20-Sep-10 Abgostaran Improvement of Water R IDM/W406 (Lot 3) Shopping Post 10-Aug-09 17-Aug-09 N.A. N.A. 24-Aug-09 07-Sep-09 N.A. N.A. 27-Oct-09 3-Nov-09 4 10-Nov-09 10-Mar-10 Tabarestan 100 Recourses (Kalleh Bast Co. Rehabilitation of Canals) A 10-Aug-09 10-Aug-09 N.A. N.A. 01-Oct-09 24-Oct-09 N.A. N.A. 11-Nov-09 17-Dec-09 21-Dec-09 20-Jan-11 Rehabilitation and P IDM/W406 B1 MOJA NCB Post 23-May-09 07-Jun-09 N.A. 17-Jun-09 17-Jun-09 17-Jul-09 N.A. N.A. 06-Aug-09 26-Aug-09 12 25-Sep-09 20-Sep-10 Improvement of Water Saghf Bana R IDM/W406 (Lot 4) Shopping Post 10-Aug-09 17-Aug-09 N.A. N.A. 24-Aug-09 07-Sep-09 N.A. N.A. 27-Oct-09 3-Nov-09 4 10-Nov-09 10-Mar-10 100 Recourses (Mouzi Galleh Babol Co. Dredging of Ab Bandan) A 10-Aug-09 10-Aug-09 N.A. N.A. 10-Oct-09 24-Oct-09 N.A. N.A. 11-Nov-09 28-Dec-09 30-Dec-09 21-Dec-10 Dredging of On-Farm and P IDM/W407 B1 MOJA NCB Post 01-Dec-11 16-Dec-11 N.A. 26-Dec-11 26-Dec-11 25-Jan-12 N.A. N.A. 14-Feb-12 5-Mar-12 7 04-Apr-12 31-Oct-12 Traditional Tertiary R Canals A Office & Store Buildings P IDM/W501a B2 MOJA Shopping Post 01-Sep-07 15-Sep-07 01-Oct-07 15-Oct-07 6-8 for 5 Selected WUA R IDM/W501 NCB Post 01-Dec-11 16-Dec-11 N.A. 26-Dec-11 26-Dec-11 25-Jan-12 N.A. N.A. 14-Feb-12 5-Mar-12 7 04-Apr-12 31-Oct-12 Centers A Office & Store Buildings P IDM/W501b B2 MOJA Shopping Post 15-Jan-08 01-Feb-08 15-Feb-08 01-Mar-08 6-8 for 11 WUA Centers R IDM/W501(Lot2) NCB 01-Feb-11 08-Feb-11 N.A. N.A. 15-Feb-11 01-Mar-11 N.A. N.A. 04-Mar-11 11-Mar-11 12 18-Mar-11 12-Mar-12 (Lot2) A P Ir&Dr/CW1 B2 MOJA Shopping Post 05-Jun-05 12-Jun-05 N.A. N.A. 19-Jun-05 03-Jul-05 N.A. N.A. 06-Jul-05 13-Jul-05 7 20-Jul-05 15-Feb-06 Office & Store Buildings R IDM/W501(Lot3) NCB 01-May-11 08-May-11 N.A. N.A. 15-May-11 29-May-11 N.A. N.A. 01-Jun-11 8-Jun-11 12 15-Jun-11 09-Jun-12 for 6WUA Centers (Lot3) A Rehabilitation of P IDM/W502 B2 MOJA ICB Prior 06-Oct-10 26-Oct-10 10-Nov-10 20-Nov-10 20-Nov-10 19-Jan-11 18-Feb-11 05-Mar-11 10-Mar-11 30-Mar-11 18 29-Apr-11 20-Oct-12 traditional canals and R IDM/W502 Lot1 NCB Post 01-Dec-11 16-Dec-11 N.A. 26-Dec-11 26-Dec-11 25-Jan-12 N.A. N.A. 14-Feb-12 24-Feb-12 7 25-Mar-12 21-Oct-12 rivers and on-farm systems A P IDM/W502 B2 MOJA ICB Prior 06-Oct-10 26-Oct-10 10-Nov-10 20-Nov-10 20-Nov-10 19-Jan-11 18-Feb-11 05-Mar-11 10-Mar-11 30-Mar-11 18 29-Apr-11 20-Oct-12 Canal lining in 4 cities R IDM/W502 Lot2 NCB Post 01-Dec-11 16-Dec-11 N.A. 26-Dec-11 26-Dec-11 25-Jan-12 N.A. N.A. 14-Feb-12 24-Feb-12 7 25-Mar-12 21-Oct-12 A P071170- Alborz Integrated Lamd and Water Resources Management Project Procurement Plan November 20, 2011 Works Preparation Bidding Evaluation Contract Implementation Plan/Revised/Actual Contractor's Name Prior/ Post Reviews Physical Progress Sub Component Completion Completion period (M) Agency Package Proc. Bidding Eval. (%) Start Contract Description Tech. Spec. Issue Bid/PQ No. Method Doc./ PQ WB - NO SPN Report WB - NO Award Signature Compl BD/PQ Submission Compl to Bank Greenhouse including P IDM/G6 B3 MOJA Shopping Post 01-Jan-09 16-Jan-09 N.A. 26-Jan-09 26-Jan-09 25-Feb-09 N.A. N.A. 17-Mar-09 6-Apr-09 24 06-May-09 26-Apr-11 heating/cooling equipment R IDM/W601 Shopping 15-May-09 22-May-09 N.A. N.A. 29-May-09 12-Jun-09 N.A. N.A. 27-Oct-09 3-Nov-09 4 10-Nov-09 10-Mar-10 Mazand 100 for plant disease A 21-Nov-09 07-Dec-09 N.A. N.A. 10-Dec-09 29-Dec-09 N.A. N.A. 23-Jan-10 18-Feb-10 21-Feb-10 19-Dec-10 Aramesh Co. assessment Ad1 IDM/W601-AD1 19-Dec-10 19-Dec-10 Subtotal MOJA Subtotal MRWC Total Both PIUs C. Integrated Water Resources Management C.1 BWC and BWF C.2 Systems Development and Technical Assistance P IWRM/W1 C2 MOJA CPP Prior Not applicable as meant for BSGF ( First year portion of a total of OS$ 0.70 million for Watershed Management R use in CDD (minor works and activities for income generation and water shed management, ___ ___ Activities distributed over 7 years of the project) A P IWRM/W2 C2 MOJA CPP Prior Not applicable as meant for BSGF ( First year portion of a total of OS$ 0.250 million for Forestry Protection and use in CDD (minor works and activities for income generation and forestry activities, ___ ___ Rehabilitation R distributed over 7 years of the project) A P IWRM/W3 C2 MOJA CPP Prior Not applicable as meant for BSGF (First year portion of a total of OS$ 0.25 million for Range Management and R use in CDD (minor works and activities for income generation and range activities, ___ ___ Development distributed over 7 years of the project) A P IWRM/W4 C3 MRWC CPP Prior Not applicable as meant for BSGF (First year portion of a total of OS$ 0.50 million for Environment Conservation use in CDD (minor works and activities for income generation and environment ___ ___ Activities R conservation activities, distributed over 7 years of the project) A P IWRM/W5 C3 MRWC CPP Prior Not applicable as meant for BSGF ( First year portion of a total of OS$ 1.30 million for Irrigation and Drainage use in CDD (minor works and activities for income generation and on-farm I&D activities, ___ ___ On-farm Activities R distributed over 7 years of the project) A Subtotal MOJA Subtotal MRWC Total Both PIUs Total Available Budget (PAD) 4.899 MUS$ D. Environmental Management Environmental P EM/W2 D2 MOJA NCB Post 05-Jul-07 25-Jul-07 N.A. 04-Aug-07 04-Aug-07 03-Sep-07 N.A. N.A. 23-Sep-07 13-Oct-07 12 12-Nov-07 06-Nov-08 Rehabilitation Activities R D2 MRWC NCB Post 01-Jun-10 21-Jun-10 N.A. 01-Jul-10 01-Jul-10 31-Jul-10 N.A. N.A. 20-Aug-10 9-Sep-10 12 09-Oct-10 04-Oct-11 from Babolsar to Babol A Subtotal MOJA Subtotal MRWC Total Both PIUs E. Project Implementation and Coordination Support P PICS/W6 E1 MOJA Shopping Post 6 habilitaiton of MOJA PIU officeR Prior A 19-Mar-08 16-Jan-09 Fajr Gostare 100 Rehabilitation of PIU- Ghaem MJAO Building First Ad PICS/W6-AD1 30-Dec-07 addendum-Revised Subtotal MOJA Subtotal MRWC Total Both PIUs Awarded contracts Not Awarded contracts Canceled Financed by GOI P071170- Alborz Integrated Lamd and Water Resources Management Project Procurement Plan November 20, 2011 Goods Preparation Bidding Evaluation Contract Implementation Physical Progress (%) Plan/Revised/Actual Prior/ Post Reviews Supplier's name Completion period Sub Component Completion Agency Proc. Package Bidding Eval. Contract Description Start Method/ Tech. Spec. Issue Bid/PQ (M) No. Doc./ PQ WB - NO SPN Report WB - NO Award Signature PQ Compl BD/PQ Submission Compl to Bank A. Upper Watershed and Forestry Management A.1 Technical Assistance and Capacity Building A.2 Soil and Water Protection A.3 Rangeland and Forest Conservation & Management Computers, Software, P UWFM/G1 A1 MOJA Shopping Post 1-Apr-05 15-Apr-05 22-Apr-05 1-May-05 1 Printers (4) Computers (6), Persia R 100 2 B&W and 1 color Trading Co. Printer) A 9-Aug-05 20-Aug-05 22-Aug-05 28-Aug-05 3-Sep-05 12-Sep-05 P UWFM/G2 A1 MOJA Shopping Post 1-Nov-05 15-Nov-05 22-Nov-05 1-Dec-05 1 Calipers, Compass, Abi Asa R 100 Altimeters Co. A 22-Oct-05 2-Nov-05 17-Dec-05 18-Dec-05 19-Dec-05 10-Apr-06 P UWFM/G3 A1 MOJA Shopping Post 1-Oct-05 15-Oct-05 22-Oct-05 1-Nov-05 1 Garos Fire Control Equipment R Tajhiz 100 A 10-Dec-05 20-Dec-05 26-Dec-05 26-Dec-05 27-Dec-05 23-Jan-06 Pouya Co. P UWFM/G4 A1 MOJA Shopping Post 31-Oct-05 15-Nov-05 22-Nov-05 1-Dec-05 1 Agri Chain Saws (12) R Keshtzar 100 A 8-Aug-05 17-Aug-05 13-Nov-05 13-Nov-05 13-Nov-05 25-Feb-06 Inst. P UWFM/G5 (Lot 1) A1 MOJA Shopping Post 31-May-06 15-Jun-06 22-Jun-06 1-Jul-06 3 Pars 4WD pickup (3) R 100 Khodro A 12-Apr-06 23-Apr-06 7-May-06 7-Jun-06 19-Jun-06 2-Jul-06 P UWFM/G5 (Lot 2) A1 MOJA Shopping Post 1-Mar-06 15-Mar-06 22-Mar-06 1-Apr-06 2 Sedans cars (4) R Iran Khodro 100 A 12-Apr-06 23-Apr-06 7-May-06 7-Jun-06 19-Jun-06 2-Jul-06 P UWFM/G6 A1 MOJA Shopping Post 31-Oct-05 30-Nov-05 15-Dec-05 1-Apr-06 1 Hamkar Loader/Backhoe (1) R 100 Motor Co. A 28-Sep-05 8-Oct-05 22-Nov-05 29-Nov-05 3-Dec-05 17-Mar-06 P UWFM/G7 (Lot 1) A1 MOJA Shopping Post 15-Jun-07 1-Jul-07 15-Jul-07 1-Aug-07 4 Garos Backpack sprayer (15) R 1-Aug-07 8-Aug-07 N.A. N.A. 15-Aug-07 29-Aug-07 5-Sep-07 N.A. 8-Sep-07 15-Sep-07 7.00 22-Sep-07 19-Apr-08 Tajhiz 100 A 29-Sep-07 1-Oct-07 20-Oct-07 20-Oct-07 23-Oct-07 23-Oct-07 30-Oct-07 9-Dec-07 Pouya Co. P UWFM/G7 (Lot 2) A1 MOJA Shopping Post 15-Jun-07 1-Jul-07 15-Jul-07 1-Aug-07 4 Ebrahimi Water tanks (2) R 1-Aug-07 8-Aug-07 N.A. N.A. 15-Aug-07 29-Aug-07 5-Sep-07 N.A. 8-Sep-07 15-Sep-07 5 22-Sep-07 19-Feb-08 100 Co. A 1-Sep-07 1-Sep-07 3-Sep-07 24-Sep-07 25-Sep-07 23-Oct-07 23-Oct-07 3.3 30-Oct-07 6-Feb-08 Watching and wireless P UWFM/G7 (Lot 3) A1 MOJA Shopping Post 15-Jun-07 1-Jul-07 15-Jul-07 1-Aug-07 4 Sahand telecommunication towers R 15-Jul-08 22-Jul-08 N.A. N.A. 29-Jul-08 12-Aug-08 19-Aug-08 N.A. 22-Aug-08 29-Aug-08 4 5-Sep-08 3-Jan-09 Ertebatat 20 (2) A 21-Jul-08 21-Jul-08 19-Aug-08 2-Sep-08 16-Sep-08 17-Sep-08 - 25-Sep-08 25-Sep-08 30-Sep-08 Sahel P UWFM/G9 (Lot 1) A3 MOJA Shopping Post 1-Feb-08 8-Feb-08 N.A. N.A. 15-Feb-08 29-Feb-08 7-Mar-08 N.A. 10-Mar-08 17-Mar-08 3 24-Mar-08 22-Jun-08 Seed and fodder R 15-Jun-10 22-Jun-10 N.A. N.A. 29-Jun-10 13-Jul-10 20-Jul-10 N.A. 23-Jul-10 30-Jul-10 4 6-Aug-10 4-Dec-10 A P UWFM/G9 (Lot 2) A3 MOJA Shopping Post 1-Aug-08 8-Aug-08 N.A. N.A. 15-Aug-08 29-Aug-08 5-Sep-08 N.A. 8-Sep-08 15-Sep-08 3 22-Sep-08 21-Dec-08 Seed and fodder R 15-Sep-10 22-Sep-10 N.A. N.A. 29-Sep-10 13-Oct-10 20-Oct-10 N.A. 23-Oct-10 30-Oct-10 4 6-Nov-10 6-Mar-11 Procurement Plan November 20, 2011 Goods Preparation Bidding Evaluation Contract Implementation Physical Progress (%) Plan/Revised/Actual Prior/ Post Reviews Supplier's name Completion period Sub Component Completion Agency Proc. Package Bidding Eval. Contract Description Start Method/ Tech. Spec. Issue Bid/PQ (M) No. Doc./ PQ WB - NO SPN Report WB - NO Award Signature PQ Compl BD/PQ Submission Compl to Bank A P UWFM/G9 (Lot 3) A3 MOJA Shopping Post 1-Aug-09 8-Aug-09 N.A. N.A. 15-Aug-09 29-Aug-09 5-Sep-09 N.A. 8-Sep-09 15-Sep-09 3 22-Sep-09 21-Dec-09 Seed and fodder R 15-Dec-10 22-Dec-10 N.A. N.A. 29-Dec-10 12-Jan-11 19-Jan-11 N.A. 22-Jan-11 29-Jan-11 4 5-Feb-11 5-Jun-11 A Subtotal MOJA Subtotal MRWC Total Both PIUs B. Irrigation and Drainage Management B.1 Rehabilitation and Development of Irrigation and Drinage Systems B.2 Institutional Support for WUA Establishment B.3 Agricultural Extension and Research Activities P IDM/G1 ( Lot 1-1) B2 MOJA NCB Prior 1-Jul-07 15-Aug-07 15-Sep-07 15-Oct-07 6 4WD (5) R NCB Prior 30-Jun-10 15-Jul-10 30-Jul-10 9-Aug-10 9-Aug-10 8-Sep-10 23-Sep-10 8-Oct-10 13-Oct-10 2-Nov-10 3 2-Dec-10 2-Mar-11 A P IDM/G1 ( Lot 1-2) B2 MOJA NCB Prior 1-Jul-07 15-Aug-07 15-Sep-07 15-Oct-07 6 4WD (10) R NCB Prior 5-Sep-10 20-Sep-10 05-Oct-10 15-Oct-10 15-Oct-10 14-Nov-10 29-Nov-10 14-Dec-10 19-Dec-10 8-Jan-11 3 7-Feb-11 8-May-11 A P IDM/G1 ( Lot 1-3) B2 MOJA NCB Prior 1-Jul-07 15-Aug-07 15-Sep-07 15-Oct-07 6 4WD (5) R NCB Prior 5-Dec-10 20-Dec-10 04-Jan-11 14-Jan-11 14-Jan-11 13-Feb-11 28-Feb-11 15-Mar-11 20-Mar-11 9-Apr-11 3 9-May-11 7-Aug-11 A P IDM/G1 ( Lot 2-1) B2 MOJA Shopping Post 1-Jul-07 15-Aug-07 15-Sep-07 15-Oct-07 6 Tractor (5) R NCB Prior 30-Dec-11 19-Jan-12 03-Feb-12 13-Feb-12 13-Feb-12 14-Mar-12 29-Mar-12 13-Apr-12 18-Apr-12 8-May-12 3 7-Jun-12 5-Sep-12 A P IDM/G1 ( Lot 2-2) B2 MOJA NCB Prior 1-Dec-07 15-Jan-08 15-Feb-08 15-Mar-08 6 Tractor (15) R NCB Prior 5-Dec-10 25-Dec-10 09-Jan-11 19-Jan-11 19-Jan-11 18-Feb-11 5-Mar-11 20-Mar-11 25-Mar-11 14-Apr-11 3 14-May-11 12-Aug-11 A P IDM/G1 ( Lot 3-1) B2 MOJA Shopping Post 1-Dec-07 15-Jan-08 15-Feb-08 15-Mar-08 6 Trucks (5) R NCB Prior 30-Dec-11 19-Jan-12 03-Feb-12 13-Feb-12 13-Feb-12 14-Mar-12 29-Mar-12 13-Apr-12 18-Apr-12 8-May-12 3 7-Jun-12 5-Sep-12 A P IDM/G1 ( Lot 3-2) B2 MOJA Shopping Post 1-Dec-07 15-Jan-08 15-Feb-08 15-Mar-08 6 Trucks (15) R Shopping Post 5-Dec-10 12-Dec-10 N.A. N.A. 19-Dec-10 2-Jan-11 9-Jan-11 N.A. 12-Jan-11 19-Jan-11 3 26-Jan-11 26-Apr-11 A P IDM/G1 ( Lot 4-1) B2 MOJA NCB Prior 1-Jul-07 15-Aug-07 15-Sep-07 15-Oct-07 6 Loader Tractor/Backhoe R NCB Prior 30-Dec-11 14-Jan-12 29-Jan-12 8-Feb-12 8-Feb-12 9-Mar-12 8-Apr-12 23-Apr-12 28-Apr-12 18-May-12 3 17-Jun-12 15-Sep-12 (5) A Procurement Plan November 20, 2011 Goods Preparation Bidding Evaluation Contract Implementation Physical Progress (%) Plan/Revised/Actual Prior/ Post Reviews Supplier's name Completion period Sub Component Completion Agency Proc. Package Bidding Eval. Contract Description Start Method/ Tech. Spec. Issue Bid/PQ (M) No. Doc./ PQ WB - NO SPN Report WB - NO Award Signature PQ Compl BD/PQ Submission Compl to Bank P IDM/G1 ( Lot 4-2) B2 MOJA NCB Prior 1-Jul-07 15-Aug-07 15-Sep-07 15-Oct-07 6 Loader Tractor/Backhoe R NCB Prior 5-Dec-10 20-Dec-10 04-Jan-11 14-Jan-11 14-Jan-11 13-Feb-11 15-Mar-11 30-Mar-11 4-Apr-11 24-Apr-11 3 24-May-11 22-Aug-11 (15) A O&M Tools and P IDM/G3 B2 MOJA Shopping Post 31 Apr 31-May-07 15-Jun-07 1-Jul-07 6 Equipment for Water R Shopping Post 29-Aug-10 5-Sep-10 N.A. N.A. 2007 12-Sep-10 26-Sep-10 3-Oct-10 N.A. 6-Oct-10 13-Oct-10 2 20-Oct-10 19-Dec-10 Users Association A P IDM/G4 (Lot 1) B2 MOJA Shopping Post 31 Apr 31-May-07 15-Jun-07 1-Jul-07 6 Office Furniture and 2007 Equipment for 5 Water R Shopping Post 30-Dec-11 6-Jan-12 N.A. N.A. 13-Jan-12 27-Jan-12 3-Feb-12 N.A. 6-Feb-12 13-Feb-12 2 20-Feb-12 20-Apr-12 Users Association centers A P IDM/G4 (Lot 2) B2 MOJA Shopping Post 31 Apr 31-May-07 15-Jun-07 1-Jul-07 6 Office Furniture and 2007 Equipment for 10 Water R Shopping Post 5-Jul-10 12-Jul-10 N.A. N.A. 19-Jul-10 2-Aug-10 9-Aug-10 N.A. 12-Aug-10 19-Aug-10 2 26-Aug-10 25-Oct-10 Users Association centers A P IDM/G4 (Lot 3) B2 MOJA Shopping Post 4-Jan-10 11-Jan-10 N.A. N.A. 18-Jan-10 1-Feb-10 8-Feb-10 N.A. 11-Feb-10 18-Feb-10 2 25-Feb-10 26-Apr-10 Office Furniture and Equipment for 5 Water Shopping Post 5-Oct-10 12-Oct-10 N.A. N.A. 19-Oct-10 2-Nov-10 9-Nov-10 N.A. 12-Nov-10 19-Nov-10 2 26-Nov-10 25-Jan-11 Users Association Centers Laboratory Equipment for P IDM/G5 B3 MOJA Shopping Post 15-May-06 31-May-06 7-Jun-06 21-Jun-06 3 Abi Asa Agricultural Research R 100 Co. Laboratories A 7-Jun-06 20-Jun-06 25-Jun-06 26-Jun-06 20-Mar-07 20-Mar-07 Greenhouse including P IDM/G6 B3 MOJA Shopping Post 1-Jan-09 16-Jan-09 N.A. 26-Jan-09 26-Jan-09 25-Feb-09 N.A. N.A. 17-Mar-09 6-Apr-09 24 6-May-09 26-Apr-11 heating/cooling equipment R IDM/G6 Shopping 15-May-09 30-May-09 N.A. 9-Jun-09 9-Jun-09 9-Jul-09 N.A. N.A. 29-Jul-09 18-Aug-09 18 17-Sep-09 11-Mar-11 for plant disease assessment A Equipment for research P IDM/G7 B3 MOJA Shopping Post 15-May-06 31-May-06 7-Jun-06 21-Jun-06 3 Olom Training Centres (in 4 R Pishrafteh 100 Packages) – Specifications A 28-Feb-06 10-Mar-06 9-Apr-06 18-Apr-06 11-Feb-07 11-Feb-07 Co. are ready P Ir&Dr/G10 B3 MOJA NCB Prior 1-Oct-07 16-Oct-07 31-Oct-07 10-Nov-07 10-Nov-07 10-Dec-07 25-Dec-07 25-Dec-07 30-Dec-07 19-Jan-08 3 18-Feb-08 18-May-08 Darpang Field Equipment R IDM/G8 Shopping Post 1-Apr-10 8-Apr-10 N.A. N.A. 15-Apr-10 29-Apr-10 6-May-10 N.A. 9-May-10 16-May-10 3 23-May-10 21-Aug-10 100 Afzarmand A 20-Jan-10 1-Mar-10 N.A. N.A. 25-Mar-10 5-Apr-10 5-Apr-10 N.A. 18-Apr-10 18-Apr-10 19-May-10 19-May-10 P Ir&Dr/G11 B3 MOJA Shopping Post 15-Dec-07 22-Dec-07 N.A. N.A. 29-Dec-07 12-Jan-08 19-Jan-08 N.A. 22-Jan-08 29-Jan-08 3 5-Feb-08 5-May-08 Van for agronomy and R IDM/G9 Shopping Post 1-Aug-10 8-Aug-10 N.A. N.A. 15-Aug-10 29-Aug-10 5-Sep-10 N.A. 8-Sep-10 15-Sep-10 3 22-Sep-10 21-Dec-10 research (2) A P Ir&Dr/G17 MOJA Shopping Post 1-Sep-05 8-Sep-05 N.A. N.A. 15-Sep-05 29-Sep-05 6-Oct-05 N.A. 9-Oct-05 16-Oct-05 3 23-Oct-05 21-Jan-06 Tools, small equipment R IDM/G10 1-Dec-09 8-Dec-09 N.A. N.A. 15-Dec-09 29-Dec-09 5-Jan-10 N.A. 8-Jan-10 15-Jan-10 3 22-Jan-10 22-Apr-10 and materials for O&M A P Ir&Dr/G19 B1 MRWC NCB Prior 23-Nov-04 8-Dec-04 23-Dec-04 2-Jan-05 2-Jan-05 1-Feb-05 16-Feb-05 16-Feb-05 21-Feb-05 13-Mar-05 3 12-Apr-05 11-Jul-05 Vehicles for operation and maintenance of the canals R IDM/G11 23-Sep-10 8-Oct-10 23-Oct-10 2-Nov-10 2-Nov-10 2-Dec-10 17-Dec-10 1-Jan-11 6-Jan-11 26-Jan-11 3 25-Feb-11 26-May-11 (Sedan#1 & 4WD#2) A P Ir&Dr/G20 B1 MRWC Shopping Post 1-Apr-05 8-Apr-05 N.A. N.A. 15-Apr-05 29-Apr-05 6-May-05 N.A. 9-May-05 16-May-05 3 23-May-05 21-Aug-05 Computer systems for Procurement Plan November 20, 2011 Goods Preparation Bidding Evaluation Contract Implementation Physical Progress (%) Plan/Revised/Actual Prior/ Post Reviews Supplier's name Completion period Sub Component Completion Agency Proc. Package Bidding Eval. Contract Description Start Method/ Tech. Spec. Issue Bid/PQ (M) No. Doc./ PQ WB - NO SPN Report WB - NO Award Signature PQ Compl BD/PQ Submission Compl to Bank Computer systems for operation and maintenance R IDM/G12 23-Oct-10 30-Oct-10 N.A. N.A. 6-Nov-10 20-Nov-10 27-Nov-10 N.A. 30-Nov-10 7-Dec-10 3 14-Dec-10 14-Mar-11 of the canals A P Ir&Dr/G21 B1 MRWC Shopping Post 1-Apr-05 8-Apr-05 N.A. N.A. 15-Apr-05 29-Apr-05 6-May-05 N.A. 9-May-05 16-May-05 3 23-May-05 21-Aug-05 offices equipment for operation and maintenance R IDM/G13 23-Oct-10 30-Oct-10 N.A. N.A. 6-Nov-10 20-Nov-10 27-Nov-10 N.A. 30-Nov-10 7-Dec-10 3 14-Dec-10 14-Mar-11 of the canals A P Ir&Dr/G22 B1 MRWC NCB Prior 1-May-05 16-May-05 31-May-05 10-Jun-05 10-Jun-05 10-Jul-05 25-Jul-05 25-Jul-05 30-Jul-05 19-Aug-05 3 18-Sep-05 17-Dec-05 Machinery for operation and maintenance of the R IDM/G14 (Lot1) 20-Dec-11 9-Jan-12 15-Jan-00 25-Jan-00 25-Jan-00 24-Feb-00 10-Mar-00 25-Mar-00 30-Mar-00 19-Apr-00 3 19-May-00 17-Aug-00 canals (Excavator#2) A P Ir&Dr/G22 B1 MRWC NCB Prior 1-May-05 16-May-05 31-May-05 10-Jun-05 10-Jun-05 10-Jul-05 25-Jul-05 25-Jul-05 30-Jul-05 19-Aug-05 3 18-Sep-05 17-Dec-05 Machinery for operation and maintenance of the R IDM/G14 (Lot2) 20-Dec-11 9-Jan-12 24-Jan-12 3-Feb-12 3-Feb-12 4-Mar-12 19-Mar-12 3-Apr-12 8-Apr-12 28-Apr-12 3 28-May-12 26-Aug-12 canals (Grader G14#1) A P Ir&Dr/G22 B1 MRWC NCB Prior 1-May-05 16-May-05 31-May-05 10-Jun-05 10-Jun-05 10-Jul-05 25-Jul-05 25-Jul-05 30-Jul-05 19-Aug-05 3 18-Sep-05 17-Dec-05 Machinery for operation and maintenance of the R IDM/G14 (Lot3) Shopping 20-Dec-11 27-Dec-11 N.A. N.A. 3-Jan-12 17-Jan-12 24-Jan-12 N.A. 27-Jan-12 3-Feb-12 3 10-Feb-12 10-May-12 canals (Truck#1) A P Ir&Dr/G22 B1 MRWC NCB Prior 1-May-05 16-May-05 31-May-05 10-Jun-05 10-Jun-05 10-Jul-05 25-Jul-05 25-Jul-05 30-Jul-05 19-Aug-05 3 18-Sep-05 17-Dec-05 Machinery for operation and maintenance of the R IDM/G14 (Lot4) 20-Dec-11 9-Jan-12 24-Jan-12 3-Feb-12 3-Feb-12 4-Mar-12 19-Mar-12 3-Apr-12 8-Apr-12 28-Apr-12 3 28-May-12 26-Aug-12 canals (Loader#1) A P Ir&Dr/G23 B1 MRWC NCB Prior 2-May-07 17-May-07 01-Jun-07 11-Jun-07 11-Jun-07 11-Jul-07 26-Jul-07 26-Jul-07 31-Jul-07 20-Aug-07 3 19-Sep-07 18-Dec-07 Training and field R IDM/G15 Shopping Post 20-Jun-10 27-Jun-10 N.A. N.A. 4-Jul-10 18-Jul-10 25-Jul-10 N.A. 28-Jul-10 4-Aug-10 3 11-Aug-10 9-Nov-10 equipment A Audiovisual for extension P Ir&Dr/G25 B3 MOJA NCB Prior 5-Jan-08 20-Jan-08 04-Feb-08 14-Feb-08 14-Feb-08 15-Mar-08 30-Mar-08 30-Mar-08 4-Apr-08 24-Apr-08 3 24-May-08 22-Aug-08 centers (Video camera, Tahmasbi R IDM/G17 Shopping Post 1-Sep-08 8-Sep-08 N.A. N.A. 15-Sep-08 29-Sep-08 6-Oct-08 N.A. 9-Oct-08 16-Oct-08 3 23-Oct-08 21-Jan-09 100 Digital photo camera, Store Color TV) A IDM/G17 (Lot 1) 6-Sep-08 8-Sep-08 27-Sep-08 N.A. 20-Oct-08 10-Nov-08 16-Nov-08 N.A. 18-Nov-08 18-Nov-08 18-Nov-08 30-Nov-08 P Ir&Dr/G25 B3 MOJA NCB Prior 5-Jan-08 20-Jan-08 04-Feb-08 14-Feb-08 14-Feb-08 15-Mar-08 30-Mar-08 30-Mar-08 4-Apr-08 24-Apr-08 3 24-May-08 22-Aug-08 Audiovisual for extension Arman centers (Video projection, R IDM/G17 Shopping Post 1-Sep-08 8-Sep-08 N.A. N.A. 15-Sep-08 29-Sep-08 6-Oct-08 N.A. 9-Oct-08 16-Oct-08 3 23-Oct-08 21-Jan-09 100 Gostar Co. Screen, Visualizer) A IDM/G17 (Lot 2) 6-Sep-08 8-Sep-08 27-Sep-08 N.A. 20-Oct-08 2-Nov-08 3-Nov-08 N.A. 9-Nov-08 9-Nov-08 12-Nov-08 24-Nov-08 Audiovisual for extension P Ir&Dr/G25 B3 MOJA NCB Prior 5-Jan-08 20-Jan-08 04-Feb-08 14-Feb-08 14-Feb-08 15-Mar-08 30-Mar-08 30-Mar-08 4-Apr-08 24-Apr-08 3 24-May-08 22-Aug-08 centers (White board, 4- R IDM/G17 Shopping Post 1-Sep-08 8-Sep-08 N.A. N.A. 15-Sep-08 29-Sep-08 1-Apr-10 N.A. 4-Apr-10 11-Apr-10 3 18-Apr-10 17-Jul-10 drawe chest, bookshelf, Table armchair) A IDM/G17 (Lot 3) 6-Sep-08 8-Sep-08 27-Sep-08 N.A. 20-Oct-08 10-Nov-08 P Ir&Dr/G25 B3 MOJA NCB Prior 5-Jan-08 20-Jan-08 04-Feb-08 14-Feb-08 14-Feb-08 15-Mar-08 30-Mar-08 30-Mar-08 4-Apr-08 24-Apr-08 3 24-May-08 22-Aug-08 Audiovisual for extension R IDM/G17 Shopping Post 1-Jun-10 8-Jun-10 N.A. N.A. 15-Jun-10 29-Jun-10 6-Jul-10 N.A. 9-Jul-10 16-Jul-10 3 23-Jul-10 21-Oct-10 centers (Photo copeir) Procurement Plan November 20, 2011 Goods Preparation Bidding Evaluation Contract Implementation Physical Progress (%) Plan/Revised/Actual Prior/ Post Reviews Supplier's name Completion period Sub Component Completion Agency Proc. Package Bidding Eval. Contract Description Start Method/ Tech. Spec. Issue Bid/PQ (M) No. Doc./ PQ WB - NO SPN Report WB - NO Award Signature PQ Compl BD/PQ Submission Compl to Bank centers (Photo copeir) A IDM/G17 (Lot 4) P Ir&Dr/G26 B3 MOJA Shopping Post 1-Apr-08 8-Apr-08 N.A. N.A. 15-Apr-08 29-Apr-08 6-May-08 N.A. 9-May-08 16-May-08 3 23-May-08 21-Aug-08 Communication Pardazeshg (computer, printer, fax R IDM/G18 Shopping Post 1-Sep-08 8-Sep-08 N.A. N.A. 15-Sep-08 29-Sep-08 6-Oct-08 N.A. 9-Oct-08 16-Oct-08 3 23-Oct-08 21-Jan-09 100 aran Co. etc.) for extension centers A 6-Sep-08 8-Sep-08 27-Sep-08 N.A. 20-Oct-08 10-Nov-08 16-Nov-08 N.A. 18-Nov-08 18-Nov-08 23-Nov-08 15-Dec-08 P Ir&Dr/G28 B2 MOJA Shopping Post 1-Apr-05 8-Apr-05 N.A. N.A. 15-Apr-05 29-Apr-05 6-May-05 N.A. 9-May-05 16-May-05 3 23-May-05 21-Aug-05 Equipment for cenetral R IDM/G19 Shopping Post 28-Dec-11 4-Jan-12 N.A. N.A. 11-Jan-12 25-Jan-12 1-Feb-12 N.A. 4-Feb-12 11-Feb-12 3 18-Feb-12 18-May-12 WUA office A P Ir&Dr/G30 B3 MOJA Shopping Post 1-Jun-10 8-Jun-10 N.A. N.A. 15-Jun-10 29-Jun-10 6-Jul-10 N.A. 9-Jul-10 16-Jul-10 3 23-Jul-10 21-Oct-10 Fertilizer R IDM/G21 A P Ir&Dr/G31 B3 MOJA Shopping Post 1-Nov-10 8-Nov-10 N.A. N.A. 15-Nov-10 29-Nov-10 6-Dec-10 N.A. 9-Dec-10 16-Dec-10 3 23-Dec-10 23-Mar-11 Fertilizer R IDM/G22 A P Ir&Dr/G32 B3 MOJA Shopping Post 1-Nov-11 8-Nov-11 N.A. N.A. 15-Nov-11 29-Nov-11 6-Dec-11 N.A. 9-Dec-11 16-Dec-11 3 23-Dec-11 22-Mar-12 Fertilizer R IDM/G23 A P Ir&Dr/G34 B3 MOJA Shopping Post 1-Jun-10 8-Jun-10 N.A. N.A. 15-Jun-10 29-Jun-10 6-Jul-10 N.A. 9-Jul-10 16-Jul-10 3 23-Jul-10 21-Oct-10 Plant Protection R IDM/G25 (chemical) A P Ir&Dr/G35 B3 MOJA Shopping Post 1-Sep-10 8-Sep-10 N.A. N.A. 15-Sep-10 29-Sep-10 6-Oct-10 N.A. 9-Oct-10 16-Oct-10 3 23-Oct-10 21-Jan-11 Plant Protection R IDM/G26 (chemical) A P Ir&Dr/G36 B3 MOJA Shopping Post 1-Apr-11 8-Apr-11 N.A. N.A. 15-Apr-11 29-Apr-11 6-May-11 N.A. 9-May-11 16-May-11 3 23-May-11 21-Aug-11 Plant Protection R IDM/G27 (chemical) A P Ir&Dr/G38 B3 MOJA Shopping Post 1-Jun-10 8-Jun-10 N.A. N.A. 15-Jun-10 29-Jun-10 6-Jul-10 N.A. 9-Jul-10 16-Jul-10 3 23-Jul-10 21-Oct-10 Seed R IDM/G29 A P Ir&Dr/G39 B3 MOJA Shopping Post 1-Sep-10 8-Sep-10 N.A. N.A. 15-Sep-10 29-Sep-10 6-Oct-10 N.A. 9-Oct-10 16-Oct-10 3 23-Oct-10 21-Jan-11 Seed R IDM/G30 A P Ir&Dr/G40 B3 MOJA Shopping Post 1-Apr-11 8-Apr-11 N.A. N.A. 15-Apr-11 29-Apr-11 6-May-11 N.A. 9-May-11 16-May-11 3 23-May-11 21-Aug-11 Seed R IDM/G31 A P IDM/G32 B3 MOJA NCB Prior 15-Sep-10 30-Sep-10 15-Oct-10 25-Oct-10 25-Oct-10 24-Nov-10 9-Dec-10 24-Dec-10 29-Dec-10 18-Jan-11 3 17-Feb-11 18-May-11 Vehicle for Extension R Centers (12) A Subtotal MOJA Subtotal MRWC Total Both PIUs Procurement Plan November 20, 2011 Goods Preparation Bidding Evaluation Contract Implementation Physical Progress (%) Plan/Revised/Actual Prior/ Post Reviews Supplier's name Completion period Sub Component Completion Agency Proc. Package Bidding Eval. Contract Description Start Method/ Tech. Spec. Issue Bid/PQ (M) No. Doc./ PQ WB - NO SPN Report WB - NO Award Signature PQ Compl BD/PQ Submission Compl to Bank C. Integrated Water Resources Management C.1 BWC and BWF C.2 Systems Develop[ment and Technical Assistance P IWRM/G1 C1 MRWC Shopping Post 1-Apr-05 8-Apr-05 N.A. N.A. 15-Apr-05 29-Apr-05 6-May-05 N.A. 9-May-05 16-May-05 3 23-May-05 21-Aug-05 4WD Vehicle (1) R IWRM/G1(Lot 1) Shopping Post 20-Jun-10 27-Jun-10 N.A. N.A. 4-Jul-10 18-Jul-10 25-Jul-10 N.A. 28-Jul-10 4-Aug-10 3 11-Aug-10 9-Nov-10 A P IWRM/G1 C2 MOJA Shopping Post 1-Apr-05 8-Apr-05 N.A. N.A. 15-Apr-05 29-Apr-05 6-May-05 N.A. 9-May-05 16-May-05 3 23-May-05 21-Aug-05 4WD Vehicle (1) R IWRM/G1(Lot 2) Shopping Post 20-Jun-10 27-Jun-10 N.A. N.A. 4-Jul-10 18-Jul-10 25-Jul-10 N.A. 28-Jul-10 4-Aug-10 3 11-Aug-10 9-Nov-10 A P IWRM/G2 C2 MOJA Shopping Post 1-Apr-05 8-Apr-05 N.A. N.A. 15-Apr-05 29-Apr-05 6-May-05 N.A. 9-May-05 16-May-05 3 23-May-05 21-Aug-05 Office Equipment for R Shopping Post 1-May-10 8-May-10 N.A. N.A. 15-May-10 29-May-10 5-Jun-10 N.A. 8-Jun-10 15-Jun-10 3 22-Jun-10 20-Sep-10 BWSC A P IWRM/G5 C2 MRWC SS Prior 1-Jan-08 21-Jan-08 05-Feb-08 15-Feb-08 15-Feb-08 15-Apr-08 15-May-08 30-May-08 4-Jun-08 24-Jun-08 30 24-Jul-08 10-Jan-11 MIS/GIS Center HW and R IWRM/G5 Lot1 MOJA NCB Prior 15-Dec-09 4-Jan-10 07-Jun-10 17-Jun-10 17-Jun-10 16-Aug-10 15-Sep-10 30-Sep-10 5-Oct-10 25-Oct-10 12 24-Nov-10 19-Nov-11 Sare SW for BWSC-MOJA A 23-May-10 23-May-10 30-Jun-10 3-Jul-10 3-Jul-10 18-Jul-10 30-Aug-10 21-Oct-10 26-Dec-10 14-Mar-11 25-Jun-11 Shomal Co. Addendum No. 1 Ad 23-Oct-11 P IWRM/G5 C2 MRWC SS Prior 1-Jan-08 21-Jan-08 05-Feb-08 15-Feb-08 15-Feb-08 15-Apr-08 15-May-08 30-May-08 4-Jun-08 24-Jun-08 30 24-Jul-08 10-Jan-11 MIS/GIS Center HW and Sare R IWRM/G5 Lot2 MRWC NCB Prior 15-Dec-09 4-Jan-10 07-Jun-10 17-Jun-10 17-Jun-10 16-Aug-10 15-Sep-10 30-Sep-10 5-Oct-10 25-Oct-10 12 24-Nov-10 19-Nov-11 SW for BWSC-MRWC Shomal Co. A 23-May-10 23-May-10 30-Jun-10 3-Jul-10 3-Jul-10 18-Jul-10 30-Aug-10 21-Oct-10 1-Jan-11 14-Mar-11 25-Jun-11 Flood Warning, P PICS/G9 C4 MRWC NCB Prior 15-Dec-07 15-Feb-08 15-Mar-08 15-May-08 Hydroclimatology and R IWRM/G3 ICB Prior 15-Apr-09 5-May-09 20-May-09 30-May-09 30-May-09 29-Jul-09 28-Aug-09 12-Sep-09 17-Sep-09 7-Oct-09 12 6-Nov-09 1-Nov-10 related equipment A Subtotal MOJA Subtotal MRWC Total Both PIUs D. Environmental Management D.1 Water Quality Control D.2 Ecological Studies D.3 Forest and Wild Life Management D.4 Pest Management Plan D.5 Public Participation and Consulatation P EM/G1 D1 MRWC ICB Prior 2-May-05 22-May-05 06-Jun-05 16-Jun-05 16-Jun-05 15-Aug-05 14-Sep-05 29-Sep-05 4-Oct-05 24-Oct-05 30 23-Nov-05 11-May-08 Continuous monitoring R ICB Prior 15-Apr-10 5-May-10 09-Jun-10 19-Jun-10 19-Jun-10 18-Aug-10 17-Sep-10 2-Oct-10 7-Oct-10 27-Oct-10 12 26-Nov-10 21-Nov-11 devices A 15-May-10 25-May-10 P EM/G2 D1 MRWC Shopping Post 1-Feb-05 8-Feb-05 N.A. N.A. 15-Feb-05 1-Mar-05 8-Mar-05 N.A. 11-Mar-05 18-Mar-05 0.50 25-Mar-05 9-Apr-05 Pressure transducer with R Shopping Post 15-Apr-10 22-Apr-10 N.A. N.A. 29-Apr-10 13-May-10 20-May-10 N.A. 23-May-10 30-May-10 0.50 6-Jun-10 21-Jun-10 built in data logger A Procurement Plan November 20, 2011 Goods Preparation Bidding Evaluation Contract Implementation Physical Progress (%) Plan/Revised/Actual Prior/ Post Reviews Supplier's name Completion period Sub Component Completion Agency Proc. Package Bidding Eval. Contract Description Start Method/ Tech. Spec. Issue Bid/PQ (M) No. Doc./ PQ WB - NO SPN Report WB - NO Award Signature PQ Compl BD/PQ Submission Compl to Bank P EM/G3 D1 MRWC Shopping Post 1-Feb-05 8-Feb-05 N.A. N.A. 15-Feb-05 1-Mar-05 8-Mar-05 N.A. 11-Mar-05 18-Mar-05 0.50 25-Mar-05 9-Apr-05 Field portable pocket PCs R Shopping Post 15-Apr-10 22-Apr-10 N.A. N.A. 29-Apr-10 13-May-10 20-May-10 N.A. 23-May-10 30-May-10 0.50 6-Jun-10 21-Jun-10 A Computer hardware & P EM/G5 D1 MRWC Shopping Post 1-Feb-05 8-Feb-05 N.A. N.A. 15-Feb-05 1-Mar-05 8-Mar-05 N.A. 11-Mar-05 18-Mar-05 0.50 25-Mar-05 9-Apr-05 accessories for Central R Shopping Post 15-Apr-10 22-Apr-10 N.A. N.A. 29-Apr-10 13-May-10 20-May-10 N.A. 23-May-10 30-May-10 0.50 6-Jun-10 21-Jun-10 Control Unit A P EM/G6 (Lot 1) D1 MRWC ICB Prior 1-Feb-05 21-Feb-05 08-Mar-05 18-Mar-05 18-Mar-05 17-May-05 16-Jun-05 1-Jul-05 6-Jul-05 26-Jul-05 30 25-Aug-05 11-Feb-08 Laboratory Equipment Farasar R Shopping Post 15-Apr-10 22-Apr-10 N.A. N.A. 29-Apr-10 13-May-10 20-May-10 N.A. 23-May-10 30-May-10 3 6-Jun-10 4-Sep-10 (Base Parameter testers) Shimi A 21-Jun-10 25-Jun-10 N.A. N.A. 29-Jun-10 25-Jul-10 15-Sep-10 N.A. 15-Sep-10 28-Feb-11 28-Feb-11 22-Oct-11 P EM/G6 (Lot 2) D1 MRWC ICB Prior 1-Feb-05 21-Feb-05 08-Mar-05 18-Mar-05 18-Mar-05 17-May-05 16-Jun-05 1-Jul-05 6-Jul-05 26-Jul-05 30 25-Aug-05 11-Feb-08 Laboratory Equipment R ICB Prior 15-Jul-08 4-Aug-08 11-Sep-08 21-Sep-08 21-Sep-08 20-Nov-08 21-Jan-09 5-Feb-09 10-Feb-09 21-Apr-09 6 21-May-09 17-Nov-09 Agrotec (Laboratory Ware) A 27-Aug-08 27-Aug-08 28-Oct-08 29-Oct-08 29-Oct-08 22-Dec-08 2-Feb-09 24-Feb-09 1-Apr-09 25-Jul-09 P EM/G6 (Lot 3) D1 MRWC Shopping Post 1-Dec-09 8-Dec-09 N.A. N.A. 15-Dec-09 29-Dec-09 5-Jan-10 N.A. 8-Jan-10 15-Jan-10 3 22-Jan-10 22-Apr-10 Laboratory Equipment R Shopping Post 15-Apr-10 22-Apr-10 N.A. N.A. 29-Apr-10 13-May-10 20-May-10 N.A. 23-May-10 30-May-10 3 6-Jun-10 4-Sep-10 (Chemicals) A P EM/G6 (Lot 4) D1 MRWC ICB Prior 1-Feb-05 21-Feb-05 08-Mar-05 18-Mar-05 18-Mar-05 17-May-05 16-Jun-05 1-Jul-05 6-Jul-05 26-Jul-05 30 25-Aug-05 11-Feb-08 Laboratory Equipment R ICB Prior 15-Jul-08 4-Aug-08 11-Sep-08 21-Sep-08 21-Sep-08 20-Nov-08 21-Jan-09 5-Feb-09 10-Feb-09 21-Apr-09 6 21-May-09 17-Nov-09 MKS (Advanced Equipment) A 27-Aug-08 27-Aug-08 28-Oct-08 29-Oct-08 29-Oct-08 22-Dec-08 2-Feb-09 24-Feb-09 1-Apr-09 3-Sep-09 P EM/G6 (Lot 5) D1 MRWC ICB Prior 1-Feb-05 21-Feb-05 08-Mar-05 18-Mar-05 18-Mar-05 17-May-05 16-Jun-05 1-Jul-05 6-Jul-05 26-Jul-05 30 25-Aug-05 11-Feb-08 Laboratory Equipment R ICB Prior 15-Jul-08 4-Aug-08 11-Sep-08 21-Sep-08 21-Sep-08 20-Nov-08 21-Jan-09 5-Feb-09 10-Feb-09 17-Jun-09 6 17-Jul-09 13-Jan-10 Agrotec (Common Lab Equipment) A 27-Aug-08 27-Aug-08 28-Oct-08 29-Oct-08 29-Oct-08 22-Dec-08 2-Feb-09 24-Feb-09 28-May-09 25-Jul-09 P EM/G6 (Lot 6) D1 MRWC ICB Prior 1-Feb-05 21-Feb-05 08-Mar-05 18-Mar-05 18-Mar-05 17-May-05 16-Jun-05 1-Jul-05 6-Jul-05 26-Jul-05 30 25-Aug-05 11-Feb-08 Laboratory Equipment R ICB Prior 15-Jul-08 4-Aug-08 11-Sep-08 21-Sep-08 21-Sep-08 20-Nov-08 21-Jan-09 17-Feb-09 22-Feb-09 14-Mar-09 6 13-Apr-09 10-Oct-09 MKS (Sampleres) A 27-Aug-08 27-Aug-08 28-Oct-08 29-Oct-08 29-Oct-08 22-Dec-08 2-Feb-09 2-Jul-09 8-Jul-09 3-Sep-09 Procurement Plan November 20, 2011 Goods Preparation Bidding Evaluation Contract Implementation Physical Progress (%) Plan/Revised/Actual Prior/ Post Reviews Supplier's name Completion period Sub Component Completion Agency Proc. Package Bidding Eval. Contract Description Start Method/ Tech. Spec. Issue Bid/PQ (M) No. Doc./ PQ WB - NO SPN Report WB - NO Award Signature PQ Compl BD/PQ Submission Compl to Bank 4WD vehicle equipped for P EM/G7 D1 MOJA Shopping Post 1-Feb-05 8-Feb-05 N.A. N.A. 15-Feb-05 1-Mar-05 8-Mar-05 N.A. 11-Mar-05 18-Mar-05 0.50 25-Mar-05 9-Apr-05 transportation of samples R Shopping Post 1-Jun-10 8-Jun-10 N.A. N.A. 15-Jun-10 29-Jun-10 6-Jul-10 N.A. 9-Jul-10 16-Jul-10 0.50 23-Jul-10 7-Aug-10 (for MDOE) A P EM/G9 D1 MOJA Shopping Post 1-Feb-05 8-Feb-05 N.A. N.A. 15-Feb-05 1-Mar-05 8-Mar-05 N.A. 11-Mar-05 18-Mar-05 0.50 25-Mar-05 9-Apr-05 Computer hardware & Neda accessories for Central R EM/G8 Shopping Post 23-Aug-07 30-Aug-07 N.A. N.A. 6-Sep-07 20-Sep-07 27-Sep-07 N.A. 30-Sep-07 7-Oct-07 0.50 14-Oct-07 29-Oct-07 Computer 100 Control Unit (for MDOE) Co. A 23-Aug-07 30-Aug-07 19-Sep-07 8-Oct-07 9-Oct-07 23-Oct-07 23-Oct-07 30-Oct-07 30-Oct-07 Laboratory Equipment (for P EM/G10 D1 MOJA NCB Prior 5-Apr-05 20-Apr-05 05-May-05 15-May-05 15-May-05 14-Jun-05 29-Jun-05 14-Jul-05 19-Jul-05 8-Aug-05 5 7-Sep-05 4-Feb-06 MDOE) + Portable field R EM/G9 ICB Prior 30-Aug-08 19-Sep-08 04-Oct-08 14-Oct-08 14-Oct-08 13-Dec-08 12-Jan-09 27-Jan-09 1-Feb-09 21-Feb-09 6 23-Mar-09 19-Sep-09 measurement instument (for MDOE) A 6-Sep-09 14-Sep-09 30-Dec-09 14-Jan-10 14-Jan-10 9-Mar-10 P EM/G11 D3 MOJA Shopping Post 1-Feb-05 8-Feb-05 N.A. N.A. 15-Feb-05 1-Mar-05 8-Mar-05 N.A. 11-Mar-05 18-Mar-05 0.50 25-Mar-05 9-Apr-05 Procurement of GPS R EM/G10 Shopping Post 1-Feb-07 8-Feb-07 N.A. N.A. 15-Feb-07 1-Mar-07 8-Mar-07 N.A. 11-Mar-07 18-Mar-07 0.50 25-Mar-07 9-Apr-07 Jame Soan 100 A 23-Aug-07 4-Feb-08 6-Feb-08 23-Feb-08 25-Feb-08 12-Mar-08 12-Mar-08 6-May-08 14-May-08 P EM/G13 D3 MOJA Shopping Post 1-Feb-05 8-Feb-05 N.A. N.A. 15-Feb-05 1-Mar-05 8-Mar-05 N.A. 11-Mar-05 18-Mar-05 0.50 25-Mar-05 9-Apr-05 Equipment (Camera, Trap Bahar R EM/G11 Shopping Post 1-Feb-07 8-Feb-07 N.A. N.A. 15-Feb-07 1-Mar-07 8-Mar-07 N.A. 11-Mar-07 18-Mar-07 0.50 25-Mar-07 9-Apr-07 100 camera, binocular) Shimi Azma A 23-Aug-07 30-Aug-07 19-Sep-07 8-Oct-07 9-Oct-07 9-Oct-07 9-Oct-07 16-Oct-07 16-Oct-07 P EM/G14 D4 MOJA NCB Prior 5-Jan-05 20-Jan-05 04-Feb-05 14-Feb-05 14-Feb-05 16-Mar-05 31-Mar-05 15-Apr-05 20-Apr-05 10-May-05 5 9-Jun-05 6-Nov-05 Vehicles (1 , 4 WD) R EM/G12 (Lot 1) Shopping Post 30-Jun-10 7-Jul-10 N.A. N.A. 14-Jul-10 28-Jul-10 4-Aug-10 N.A. 7-Aug-10 14-Aug-10 0.50 21-Aug-10 5-Sep-10 A P EM/G14 D4 MOJA NCB Prior 5-Jan-05 20-Jan-05 04-Feb-05 14-Feb-05 14-Feb-05 16-Mar-05 31-Mar-05 15-Apr-05 20-Apr-05 10-May-05 5 9-Jun-05 6-Nov-05 Vehicles (4, 4 WD) R EM/G12 (Lot 2) Shopping Post 1-Sep-10 8-Sep-10 N.A. N.A. 15-Sep-10 29-Sep-10 6-Oct-10 N.A. 9-Oct-10 16-Oct-10 0.50 23-Oct-10 7-Nov-10 A P EM/G14 D4 MOJA NCB Prior 5-Jan-05 20-Jan-05 04-Feb-05 14-Feb-05 14-Feb-05 16-Mar-05 31-Mar-05 15-Apr-05 20-Apr-05 10-May-05 5 9-Jun-05 6-Nov-05 Vehicles (4 ,4 WD) R EM/G12 (Lot 3) Shopping Post 1-Dec-10 8-Dec-10 N.A. N.A. 15-Dec-10 29-Dec-10 5-Jan-11 N.A. 8-Jan-11 15-Jan-11 0.50 22-Jan-11 6-Feb-11 A Equipment (sporetraps, P EM/G15 D4 MOJA Shopping Post 1-Feb-05 8-Feb-05 N.A. N.A. 15-Feb-05 1-Mar-05 8-Mar-05 N.A. 11-Mar-05 18-Mar-05 0.50 25-Mar-05 9-Apr-05 improved sprayers for R EM/G13 NCB Prior 1-Sep-10 16-Sep-10 01-Oct-10 11-Oct-10 11-Oct-10 10-Nov-10 25-Nov-10 10-Dec-10 15-Dec-10 4-Jan-11 6.00 3-Feb-11 2-Aug-11 demos, other) A P EM/G17 D5 MOJA Shopping Post 1-Jan-07 8-Jan-07 N.A. N.A. 15-Jan-07 29-Jan-07 5-Feb-07 N.A. 8-Feb-07 15-Feb-07 0.50 22-Feb-07 9-Mar-07 Publications R EM/G14 (Lot 1) Shopping Post 1-Dec-10 8-Dec-10 N.A. N.A. 15-Dec-10 29-Dec-10 5-Jan-11 N.A. 8-Jan-11 15-Jan-11 0.50 22-Jan-11 6-Feb-11 A P EM/G17 D5 MOJA Shopping Post 1-Jan-07 8-Jan-07 N.A. N.A. 15-Jan-07 29-Jan-07 5-Feb-07 N.A. 8-Feb-07 15-Feb-07 0.50 22-Feb-07 9-Mar-07 Publications R EM/G14 (Lot 2) Shopping Post 1-Aug-10 8-Aug-10 N.A. N.A. 15-Aug-10 29-Aug-10 5-Sep-10 N.A. 8-Sep-10 15-Sep-10 0.50 22-Sep-10 7-Oct-10 A Training Facilities and P EM/G27 D6 MRWC Post 1-Dec-09 8-Dec-09 N.A. N.A. 15-Dec-09 29-Dec-09 5-Jan-10 N.A. 8-Jan-10 15-Jan-10 0.50 22-Jan-10 6-Feb-10 Instruments (2 Multimedia Shopping Projector, 2 Video R EM/G15 Post 1-Aug-10 8-Aug-10 N.A. N.A. 15-Aug-10 29-Aug-10 5-Sep-10 N.A. 8-Sep-10 15-Sep-10 0.50 22-Sep-10 7-Oct-10 Camera, 4 Camera, 6 GPS, Shopping 4 Binoculars, 6 Flash Procurement Plan November 20, 2011 Goods Preparation Bidding Evaluation Contract Implementation Physical Progress (%) Plan/Revised/Actual Prior/ Post Reviews Supplier's name Completion period Sub Component Completion Agency Proc. Package Bidding Eval. Contract Description Start Method/ Tech. Spec. Issue Bid/PQ (M) No. Doc./ PQ WB - NO SPN Report WB - NO Award Signature PQ Compl BD/PQ Submission Compl to Bank 4 Binoculars, 6 Flash A Drive, , etc.) P EM/G28 D6 MRWC Post 1-Dec-09 8-Dec-09 N.A. N.A. 15-Dec-09 29-Dec-09 5-Jan-10 N.A. 8-Jan-10 15-Jan-10 0.50 22-Jan-10 6-Feb-10 Workshop Hall Shopping Equipments (Chair, Table, R EM/G16 Post 1-Aug-10 8-Aug-10 N.A. N.A. 15-Aug-10 29-Aug-10 5-Sep-10 N.A. 8-Sep-10 15-Sep-10 0.50 22-Sep-10 7-Oct-10 White Board, Electrical Shopping Water Cooler, PC, & etc.) A Subtotal MOJA Subtotal MRWC Total Both PIUs E. Project Implementation and Coordination Support Vehicles for CLO (2 P PICS/G1 E1 MOJA Shopping Prior 15-Jan-05 1-Feb-05 15-Feb-05 28-Feb-05 - Pars Station Wagons 4 WD) R 100 Khodro under PPF Financing A 22-Jan-05 5-Feb-05 13-Feb-05 16-Feb-05 23-Feb-05 24-Feb-05 28-Feb-05 P PICS/G2 (Lot 1) E1 MOJA Shopping Prior 31-Jan-05 15-Feb-05 28-Feb-05 15-Mar-05 - Office Equipment for CLO Aftab R 100 (3 laptops) Shargh A 22-Jan-05 5-Feb-05 4-May-05 13-May-05 14-May-05 25-Jan-05 28-May-05 Office Equipment for P PICS/G2 (Lot 2) E1 MOJA Shopping Post 1-Apr-07 15-Apr-07 21-Apr-07 30-Apr-07 - Arash CLO (Computer, Printer, R 100 Computer Laptop) A 14-Mar-05 29-Mar-05 25-Feb-05 11-Mar-05 11-Mar-05 25-Jan-05 28-May-05 Vehicles for MOJA PIU (2 P PICS/G3 E1 MOJA Shopping Prior 31-Jan-05 15-Feb-05 28-Feb-05 15-Mar-05 - Station Wagons 4 WD) R under PPF Financing A 24-Feb-05 28-Feb-05 Office Equipment for P PICS/G4 (Lot 1) E1 MOJA Shopping Post 15-Dec-05 15-Jan-06 31-Jan-06 1-Mar-06 - MOJA PIU and I&D Pars R 100 Consultants (Computer Technic Equipment) A 30-Dec-05 9-Jan-06 17-Jan-06 17-Jan-06 28-Feb-06 28-Feb-06 Office Equipment for P PICS/G4 (Lot 2) E1 MOJA Shopping Post 15-Dec-05 15-Jan-06 31-Jan-06 1-Mar-06 - MOJA PIU and I&D R Alborz 100 Consultants (Audio Visual Equipment) A 4-Jan-06 14-Jan-06 2-Feb-06 13-Feb-06 19-Feb-06 19-Feb-06 P PICS/G5 (Lot 1) E2 MRWC Shopping Post 1-Sep-05 1-Oct-05 15-Oct-05 31-Oct-05 - Procurement of Vehicle (2 R Shopping Post 1-Dec-10 8-Dec-10 N.A. N.A. 15-Dec-10 29-Dec-10 5-Jan-11 N.A. 8-Jan-11 15-Jan-11 0.50 22-Jan-11 6-Feb-11 SEDAN) A P PICS/G5 (Lot 2) E2 MRWC Shopping Post 1-Sep-05 1-Oct-05 15-Oct-05 31-Oct-05 - One Van R Shopping Post 1-Dec-10 8-Dec-10 N.A. N.A. 15-Dec-10 29-Dec-10 5-Jan-11 N.A. 8-Jan-11 15-Jan-11 0.50 22-Jan-11 6-Feb-11 A Procurement Plan November 20, 2011 Goods Preparation Bidding Evaluation Contract Implementation Physical Progress (%) Plan/Revised/Actual Prior/ Post Reviews Supplier's name Completion period Sub Component Completion Agency Proc. Package Bidding Eval. Contract Description Start Method/ Tech. Spec. Issue Bid/PQ (M) No. Doc./ PQ WB - NO SPN Report WB - NO Award Signature PQ Compl BD/PQ Submission Compl to Bank Office Equipment for P PICS/G6 (Lot 1) E2 MRWC Shopping Post 1-Sep-05 1-Oct-05 15-Oct-05 31-Oct-05 Sarve Sabz, MRWC (10 computers, 1 Parand, copier, 3 color printer, 2 R 100 Shomal, black printer, 1 digital Payand handycam and 4 scanners) A 17-May-05 21-Jun-05 3-Sep-05 8-Sep-05 28-Sep-05 P PICS/G6 (Lot 2) E2 MRWC Shopping Post 15-Jan-06 1-Feb-06 15-Feb-06 28-Feb-05 Equipment for Training R A Office Equipment for P PICS/G6 (Lot 3) E2 MRWC Shopping Post 15-Jan-06 1-Feb-06 15-Feb-06 28-Feb-05 Rehabilitation of R Committee/Meeting A Rooms Equipment like computers, P PICS/G7 E2 MRWC Shopping Post 15-Jan-06 1-Feb-06 15-Feb-06 28-Feb-05 printers, copiers, mobile R phones etc A P PICS/G8 E2 MRWC Shopping Post 6-Dec-06 16-Dec-06 1-Jan-07 15-Mar-07 GPS, Total Stations R A P PICS/G9 E1 MOJA Shopping Post 17-Dec-07 24-Dec-07 N.A. N.A. 31-Dec-07 14-Jan-08 21-Jan-08 N.A. 24-Jan-08 31-Jan-08 0.50 7-Feb-08 22-Feb-08 Equipping the PIU MOJA R 30-Jul-08 6-Aug-08 N.A. N.A. 14-Jun-10 28-Jun-10 5-Jul-10 N.A. 8-Jul-10 15-Jul-10 0.50 22-Jul-10 6-Aug-10 A 6-Sep-08 8-Oct-08 15-Oct-08 N.A. Reversible heating and P PICS/G11 E2 MRWC Shopping Post 25-Apr-07 25-May-07 15-Jun-07 30-Jun-07 - cooling system for conference MGRWC R rooms & MGRWC PIU office including installation costs A P PICS/G12 E1 MOJA Shopping Post 1-Feb-09 8-Feb-09 N.A. N.A. 15-Feb-09 1-Mar-09 8-Mar-09 N.A. 11-Mar-09 18-Mar-09 0.50 25-Mar-09 9-Apr-09 Supporting services for R NCB Prior 15-Sep-10 30-Sep-10 15-Oct-10 25-Oct-10 25-Oct-10 24-Nov-10 9-Dec-10 24-Dec-10 29-Dec-10 18-Jan-11 3 17-Feb-11 18-May-11 awareness raising activities A P PICS/G13 Lot1 E1 MOJA Shopping Post 15-May-09 22-May-09 N.A. N.A. 3-Jul-10 17-Jul-10 24-Jul-10 N.A. 27-Jul-10 3-Aug-10 0.50 10-Aug-10 25-Aug-10 Rasam, Communication equipment R Datis and 100 for CLO A 23-May-09 31-May-09 N.A. N.A. 16-May-10 30-May-10 N.A. N.A. 19-Jun-10 30-Jun-10 3-Jul-10 3-Jul-10 Faratel P PICS/G13 Lot2 E1 MOJA Shopping Post 15-May-09 22-May-09 N.A. N.A. 3-Jul-10 17-Jul-10 24-Jul-10 N.A. 27-Jul-10 3-Aug-10 0.50 10-Aug-10 25-Aug-10 R Felez Office furniture for CLO 100 Tehran A 23-May-09 31-May-09 N.A. N.A. 16-May-10 30-May-10 N.A. N.A. 19-Jun-10 30-Jun-10 3-Jul-10 3-Jul-10 Subtotal MOJA Subtotal MRWC Total Both PIUs Procurement Plan November 20, 2011 Goods Preparation Bidding Evaluation Contract Implementation Physical Progress (%) Plan/Revised/Actual Prior/ Post Reviews Supplier's name Completion period Sub Component Completion Agency Proc. Package Bidding Eval. Contract Description Start Method/ Tech. Spec. Issue Bid/PQ (M) No. Doc./ PQ WB - NO SPN Report WB - NO Award Signature PQ Compl BD/PQ Submission Compl to Bank Awarded contracts Not Awarded contracts P071170- Alborz Integrated Lamd and Water Resources Management Project Procurement Plan November 20, 2011 Services Preparation Proposals Evaluation Contract Implementation Plan/Revised/Actual Consultant's Name Progress (%) Agency Package Selection Prior/ Post Submission Tech. Completion Description RFP to Issue Opening Eval. Report No. Method Reviews TOR WB - NO EOI SL WB - NO of Eval. to WB-NO WB-NO Negotiation WB-NO Signature period Start Completion Bank RFP Fin. Prop. to Bank Proposals Bank (month) A. Upper Watershed and Forestry Management A.1 Technical Assistance and Capacity Building A.2 Soil and Water Protection A.3 Rangeland and Forest Conservation & Management P UWFM/CS1 MOJA QCBS Prior 9-Jun-05 23-Jun-05 28-Jun-05 28-Jul-05 12-Aug-05 26-Aug-05 31-Aug-05 15-Oct-05 4-Nov-05 18-Nov-05 3-Dec-05 13-Dec-05 27-Dec-05 16-Jan-06 30-Jan-06 19-Feb-06 18 21-Mar-06 12-Sep-07 Upper Watershed of R Resources Management DFS Deutsche A 30-Dec-04 13-Jan-05 18-Jan-05 14-Feb-05 14-Feb-05 24-Feb-05 28-Feb-05 26-May-05 8-Sep-05 1-Oct-05 26-Oct-05 04-Apr-06 12 04-Apr-06 03-Apr-07 Forestservice 100 DFS's First Addendum- Gmbh Ad UWFM/CS1-AD1 31-Oct-06 5.5 03-Apr-07 15-Sep-07 Revised contract amount DFS's Second Addendum- Ad UWFM/CS1-AD2 16-Dec-07 8 16-Sep-07 10-May-08 Revised contract amount P UWFM/CS2 MOJA QCBS Prior 1-Feb-09 15-Feb-09 20-Feb-09 22-Mar-09 6-Apr-09 20-Apr-09 25-Apr-09 9-Jun-09 29-Jun-09 13-Jul-09 28-Jul-09 7-Aug-09 21-Aug-09 10-Sep-09 24-Sep-09 14-Oct-09 18 13-Nov-09 7-May-11 Consultant for Detail Design R UWFM/CS2-Lot 1 QCBS Prior 1-Jun-09 15-Jun-09 20-Jun-09 20-Jul-09 4-Aug-09 18-Aug-09 23-Aug-09 7-Oct-09 18-May-10 1-Jun-10 16-Jun-10 26-Jun-10 10-Jul-10 30-Jul-10 13-Aug-10 2-Sep-10 8 2-Oct-10 30-May-11 (Babol Roud and Babolak) A 27-May-09 17-Nov-09 22-Nov-09 10-Feb-10 1-Mar-10 3-Mar-10 10-Mar-10 28-Apr-10 31-Jul-10 13-Sep-10 22-Sep-10 6-Oct-10 20-Oct-10 20-Nov-11 P UWFM/CS2-Lot 2 MOJA QCBS Prior 15-Nov-09 29-Nov-09 4-Dec-09 3-Jan-10 18-Jan-10 1-Feb-10 6-Feb-10 23-Mar-10 12-Apr-10 26-Apr-10 11-May-10 21-May-10 4-Jun-10 24-Jun-10 8-Jul-10 28-Jul-10 10 27-Aug-10 23-Jun-11 Consultant for Detail Design (Eskelim Roud, Azar Roud R QCBS Prior 1-Jun-10 15-Jun-10 20-Jun-10 20-Jul-10 4-Aug-10 18-Aug-10 23-Aug-10 7-Oct-10 27-Oct-10 10-Nov-10 25-Nov-10 5-Dec-10 19-Dec-10 8-Jan-11 22-Jan-11 11-Feb-11 8 13-Mar-11 8-Nov-11 and Karsang Roud) A P UWFM/CS3 MOJA IC Post 15-Sep-07 29-Sep-07 NA 9-Oct-07 NA NA NA 24-Oct-07 NA NA NA 3-Nov-07 NA 13-Nov-07 NA 23-Nov-07 18 23-Dec-07 15-Jun-09 Lagal Consultant R A P UWFM/CS4 MOJA IC Post 15-Sep-07 29-Sep-07 NA 9-Oct-07 NA NA NA 24-Oct-07 NA NA NA 3-Nov-07 NA 13-Nov-07 NA 23-Nov-07 18 23-Dec-07 15-Jun-09 Institutional Consultant R A P UWFM/CS5 MOJA CQS Prior 15-Dec-09 29-Dec-09 3-Jan-10 2-Feb-10 17-Feb-10 3-Mar-10 8-Mar-10 22-Apr-10 12-May-10 26-May-10 10-Jun-10 20-Jun-10 4-Jul-10 24-Jul-10 7-Aug-10 27-Aug-10 20 26-Sep-10 18-May-12 Supervision of Works R QCBS Prior 1-Aug-10 15-Aug-10 20-Aug-10 19-Sep-10 4-Oct-10 18-Oct-10 23-Oct-10 7-Dec-10 27-Dec-10 10-Jan-11 25-Jan-11 4-Feb-11 18-Feb-11 10-Mar-11 24-Mar-11 13-Apr-11 15 13-May-11 5-Aug-12 Contract Consulting Services A 2-Aug-10 27-Sep-10 Subtotal MOJA Subtotal MRWC Total Both PIUs B. Irrigation and Drainage Management P IDM/CS1 MOJA QBS Prior 10-Jul-05 24-Jul-05 29-Jul-05 28-Aug-05 12-Sep-05 26-Sep-05 1-Oct-05 15-Nov-05 5-Dec-05 19-Dec-05 3-Jan-06 13-Jan-06 27-Jan-06 16-Feb-06 2-Mar-06 22-Mar-06 21-Apr-06 21-Apr-06 SNC-Lavalin & Irrigation and Drainage Hydrosult Inc R & Petro Management Consultancy A 18-Jan-05 28-Feb-05 28-Feb-05 25-May-05 30-May-05 14-Aug-05 30-Oct-05 28-Feb-06 18-Apr-08 30-Jun-12 Peyman Pars Joint Venture P IDM/CS2 MOJA IC Post 15-Dec-08 29-Dec-08 13-Jan-09 20-Jan-09 N.A. N.A. N.A. 27-Jan-09 10-Feb-09 10-Feb-09 N.A. N.A. N.A. 25-Feb-09 N.A. 4-Mar-09 Women Extension Research R Experts (12 experts) A N.A. Subtotal MOJA Subtotal MRWC Total Both PIUs C. Integrated Water Resources Management C.1 BWC and BWF C.2 Systems Development and Technical Assistance P IWRM&EM/CS1 MRWC QBS Prior 23-Apr-05 7-May-05 12-May-05 11-Jun-05 26-Jun-05 10-Jul-05 15-Jul-05 29-Aug-05 18-Sep-05 2-Oct-05 17-Oct-05 27-Oct-05 10-Nov-05 30-Nov-05 14-Dec-05 3-Jan-06 2-Feb-06 2-Feb-06 National Integrated Water Resources Engineering and Environment R Services Management Pakistan A 18-Jan-05 28-Feb-05 25-May-05 30-May-05 20-Aug-05 31-Oct-05 19-Jun-06 (NESPAK) P IWRM/CS2 MOJA CQS Prior 15-Jun-09 29-Jun-09 14-Jul-09 21-Jul-09 N.A. N.A. N.A. 28-Jul-09 11-Aug-09 11-Aug-09 N.A. N.A. N.A. 26-Aug-09 N.A. 2-Sep-09 12 2-Sep-09 28-Aug-10 Iran Center for Consultant for BWSC and R Management BWF Studies (ICMS) A 22-Jul-09 22-Sep-09 29-Sep-09 26-Oct-09 29-Nov-09 2-Dec-09 6-Jan-10 12-Jan-10 Subtotal MOJA Subtotal MRWC Total Both PIUs D. Environmental Management P EM/CS1 MRWC IC Post 15-Nov-07 29-Nov-07 14-Dec-07 21-Dec-07 N.A. N.A. N.A. 28-Dec-07 11-Jan-08 11-Jan-08 N.A. N.A. N.A. 26-Jan-08 N.A. 2-Feb-08 54 2-Feb-08 10-Jul-12 Environmental Specialist R 15-Jun-10 29-Jun-10 14-Jul-10 21-Jul-10 N.A. N.A. N.A. 28-Jul-10 11-Aug-10 11-Aug-10 N.A. N.A. N.A. 26-Aug-10 N.A. 2-Sep-10 24 2-Sep-10 22-Aug-12 A P EM/CS2 MOJA SSS Prior Environmental Studies R Mahab Ghodss 100 A Subtotal MOJA Subtotal MRWC Total Both PIUs E. Project Implementation and Coordination Support P PICS/CS1 MOJA QCBS Prior 22-Jan-05 5-Feb-05 10-Feb-05 12-Mar-05 27-Mar-05 10-Apr-05 15-Apr-05 30-May-05 19-Jun-05 3-Jul-05 18-Jul-05 28-Jul-05 11-Aug-05 31-Aug-05 14-Sep-05 4-Oct-05 84 3-Nov-05 27-Sep-12 Project Management Support R Consultancy Mott Mac A 18-Jan-05 14-Feb-05 24-Feb-05 28-Feb-05 26-May-05 1-Oct-05 26-Oct-05 1-Apr-06 Donald Euro PMSC Addendum 1-Revised consult & Ad PICS/CS1-AD1 1-Jul-06 Yekom contract amount PMSC Addendum 2-Revised Ad PICS/CS1-AD2 8-Jan-08 contract amount P PICS/CS2 (Lot 1) MOJA IC Prior 15-Jul-07 29-Jul-07 13-Aug-07 20-Aug-07 N.A. N.A. N.A. 27-Aug-07 10-Sep-07 10-Sep-07 N.A. N.A. N.A. 25-Sep-07 N.A. 2-Oct-07 54 2-Oct-07 9-Mar-12 International Procurement R Advisor 2 A 1-Aug-07 Harbaksh Sethi PICS/CS2 (Lot 1)- Addendum 1 Ad 16-Feb-08 AD1 P PICS/CS2 (Lot 2) MOJA IC Prior International Procurement R Harbaksh Sethi 100 Advisor 1 A 24-Dec-04 24 24-Dec-04 14-Dec-06 P PICS/CS3 MRWC IC Post 15-Nov-07 29-Nov-07 14-Dec-07 21-Dec-07 N.A. N.A. N.A. 28-Dec-07 11-Jan-08 11-Jan-08 N.A. N.A. N.A. 26-Jan-08 N.A. 2-Feb-08 54 2-Feb-08 10-Jul-12 Financial Officer R 15-Aug-10 29-Aug-10 13-Sep-10 20-Sep-10 N.A. N.A. N.A. 27-Sep-10 11-Oct-10 11-Oct-10 N.A. N.A. N.A. 26-Oct-10 N.A. 2-Nov-10 54 2-Nov-10 10-Apr-15 A P PICS/CS4 MRWC IC Post 15-Nov-07 29-Nov-07 14-Dec-07 21-Dec-07 N.A. N.A. N.A. 28-Dec-07 11-Jan-08 11-Jan-08 N.A. N.A. N.A. 26-Jan-08 N.A. 2-Feb-08 54 2-Feb-08 10-Jul-12 Translator R 15-Sep-10 29-Sep-10 14-Oct-10 21-Oct-10 N.A. N.A. N.A. 28-Oct-10 11-Nov-10 11-Nov-10 N.A. N.A. N.A. 26-Nov-10 N.A. 3-Dec-10 54 3-Dec-10 11-May-15 A Public Awareness and P PICS/CS5 MOJA QCBS Post 30-Aug-08 13-Sep-08 18-Sep-08 18-Oct-08 28-Oct-08 7-Nov-08 10-Nov-08 10-Dec-08 25-Dec-08 4-Jan-09 14-Jan-09 24-Jan-09 3-Feb-09 13-Feb-09 27-Feb-09 19-Mar-09 8 29-Mar-09 24-Nov-09 Documentation (Movie and R 15-Sep-10 29-Sep-10 14-Oct-10 21-Oct-10 N.A. N.A. N.A. 28-Oct-10 11-Nov-10 11-Nov-10 N.A. N.A. N.A. 26-Nov-10 N.A. 3-Dec-10 campaign) A P PICS/CS6 MOJA QCBS Prior 1-Nov-09 15-Nov-09 20-Nov-09 20-Dec-09 4-Jan-10 18-Jan-10 23-Jan-10 9-Mar-10 29-Mar-10 12-Apr-10 27-Apr-10 7-May-10 21-May-10 10-Jun-10 24-Jun-10 14-Jul-10 24 13-Aug-10 2-Aug-12 Project Consultant for R Recruitment of OSG A 2-Dec-09 14-Feb-09 P PICS/CS7-Lot1 MOJA IC Post 1-Mar-10 15-Mar-10 30-Mar-10 6-Apr-10 N.A. N.A. N.A. 13-Apr-10 27-Apr-10 27-Apr-10 N.A. N.A. N.A. 12-May-10 N.A. 19-May-10 12 19-May-10 14-May-11 Procurement Specialist-Head R Mehdi Khalili of Procurement Unit A 16-Mar-10 17-Mar-10 NA 18-Mar-10 20-Jul-10 P PICS/CS8-Lot1 MOJA IC Post 1-Mar-10 15-Mar-10 30-Mar-10 6-Apr-10 N.A. N.A. N.A. 13-Apr-10 27-Apr-10 27-Apr-10 N.A. N.A. N.A. 12-May-10 N.A. 19-May-10 12 19-May-10 14-May-11 Procurement Specialist R Saber Tehrani A 16-Mar-10 17-Mar-10 NA 18-Mar-10 20-Jul-10 P PICS/CS9-Lot1 MOJA IC Post 1-Mar-10 15-Mar-10 30-Mar-10 6-Apr-10 N.A. N.A. N.A. 13-Apr-10 27-Apr-10 27-Apr-10 N.A. N.A. N.A. 12-May-10 N.A. 19-May-10 12 19-May-10 14-May-11 Procurement Specialist for Amir Mehdi R MJAO Asghari A 16-Mar-10 17-Mar-10 NA 18-Mar-10 20-Jul-10 P PICS/CS10-Lot1 MOJA IC Post 1-Mar-10 15-Mar-10 30-Mar-10 6-Apr-10 N.A. N.A. N.A. 13-Apr-10 27-Apr-10 27-Apr-10 N.A. N.A. N.A. 12-May-10 N.A. 19-May-10 12 19-May-10 14-May-11 Irrogation Specialist for Jalaledin R MJAO Moradi A 5-May-10 11-May-10 NA 24-May-10 20-Jul-10 P PICS/CS12-Lot1 MOJA IC Post 1-Aug-10 15-Aug-10 30-Aug-10 6-Sep-10 N.A. N.A. N.A. 13-Sep-10 27-Sep-10 27-Sep-10 N.A. N.A. N.A. 12-Oct-10 N.A. 19-Oct-10 12 19-Oct-10 14-Oct-11 Individual Cosultant R A P PICS/CS13-Lot1 MOJA IC Post 1-Aug-10 15-Aug-10 30-Aug-10 6-Sep-10 N.A. N.A. N.A. 13-Sep-10 27-Sep-10 27-Sep-10 N.A. N.A. N.A. 12-Oct-10 N.A. 19-Oct-10 12 19-Oct-10 14-Oct-11 Individual Cosultant R A P PICS/CS14-Lot1 MOJA IC Post 1-Aug-10 15-Aug-10 30-Aug-10 6-Sep-10 N.A. N.A. N.A. 13-Sep-10 27-Sep-10 27-Sep-10 N.A. N.A. N.A. 12-Oct-10 N.A. 19-Oct-10 12 19-Oct-10 14-Oct-11 Individual Cosultant R A P PICS/CS15-Lot1 MOJA IC Post 1-Aug-10 15-Aug-10 30-Aug-10 6-Sep-10 N.A. N.A. N.A. 13-Sep-10 27-Sep-10 27-Sep-10 N.A. N.A. N.A. 12-Oct-10 N.A. 19-Oct-10 12 19-Oct-10 14-Oct-11 Individual Cosultant R A P PICS/CS16-Lot1 MOJA IC Post 1-Aug-10 15-Aug-10 30-Aug-10 6-Sep-10 N.A. N.A. N.A. 13-Sep-10 27-Sep-10 27-Sep-10 N.A. N.A. N.A. 12-Oct-10 N.A. 19-Oct-10 12 19-Oct-10 14-Oct-11 Individual Cosultant R A P PICS/CS17-Lot1 MOJA IC Post 1-Aug-10 15-Aug-10 30-Aug-10 6-Sep-10 N.A. N.A. N.A. 13-Sep-10 27-Sep-10 27-Sep-10 N.A. N.A. N.A. 12-Oct-10 N.A. 19-Oct-10 12 19-Oct-10 14-Oct-11 Individual Cosultant R A P PICS/CS18-Lot1 MOJA IC Post 1-Aug-10 15-Aug-10 30-Aug-10 6-Sep-10 N.A. N.A. N.A. 13-Sep-10 27-Sep-10 27-Sep-10 N.A. N.A. N.A. 12-Oct-10 N.A. 19-Oct-10 12 19-Oct-10 14-Oct-11 Individual Cosultant R A P PICS/CS19-Lot1 MOJA IC Post 1-Aug-10 15-Aug-10 30-Aug-10 6-Sep-10 N.A. N.A. N.A. 13-Sep-10 27-Sep-10 27-Sep-10 N.A. N.A. N.A. 12-Oct-10 N.A. 19-Oct-10 12 19-Oct-10 14-Oct-11 Individual Cosultant R A P PICS/CS20-Lot1 MOJA IC Post 1-Aug-10 15-Aug-10 30-Aug-10 6-Sep-10 N.A. N.A. N.A. 13-Sep-10 27-Sep-10 27-Sep-10 N.A. N.A. N.A. 12-Oct-10 N.A. 19-Oct-10 12 19-Oct-10 14-Oct-11 Individual Cosultant R A P PICS/CS21-Lot1 MOJA IC Post 1-Aug-10 15-Aug-10 30-Aug-10 6-Sep-10 N.A. N.A. N.A. 13-Sep-10 27-Sep-10 27-Sep-10 N.A. N.A. N.A. 12-Oct-10 N.A. 19-Oct-10 12 19-Oct-10 14-Oct-11 Individual Cosultant R A P PICS/CS22-Lot1 MOJA IC Post 1-Aug-10 15-Aug-10 30-Aug-10 6-Sep-10 N.A. N.A. N.A. 13-Sep-10 27-Sep-10 27-Sep-10 N.A. N.A. N.A. 12-Oct-10 N.A. 19-Oct-10 12 19-Oct-10 14-Oct-11 Individual Cosultant R A P PICS/CS23-Lot1 MOJA IC Post 1-Aug-10 15-Aug-10 30-Aug-10 6-Sep-10 N.A. N.A. N.A. 13-Sep-10 27-Sep-10 27-Sep-10 N.A. N.A. N.A. 12-Oct-10 N.A. 19-Oct-10 12 19-Oct-10 14-Oct-11 Individual Cosultant R A P PICS/CS24-Lot1 MOJA IC Post 1-Aug-10 15-Aug-10 30-Aug-10 6-Sep-10 N.A. N.A. N.A. 13-Sep-10 27-Sep-10 27-Sep-10 N.A. N.A. N.A. 12-Oct-10 N.A. 19-Oct-10 12 19-Oct-10 14-Oct-11 Individual Cosultant R A P PICS/CS25-Lot1 MOJA IC Post 1-Aug-10 15-Aug-10 30-Aug-10 6-Sep-10 N.A. N.A. N.A. 13-Sep-10 27-Sep-10 27-Sep-10 N.A. N.A. N.A. 12-Oct-10 N.A. 19-Oct-10 12 19-Oct-10 14-Oct-11 Individual Cosultant R A Subtotal MOJA Subtotal MRWC Total Both PIUs Awarded contracts Not Awarded contracts Canceled Alborz Integrated Lamd and Water Resources Management Project P071170- Alborz Integrated Lamd and Water Resources Management Project Procurement Plan November 20, 2011 Training Plan/Revise d/Actual Package Number Sub- Procurement Name of the Training Description (Draft Procurement Agency Componen Start Completion Remarks Method Institute Plan) t A. Upper Watershed and Forestry Management P UWFM/TRG1-1 MOJA A1 SS May-10 May-10 Study Tour Upland Watersched Management , R Eastern Anatolia A P UWFM/TRG1-2 MOJA A1 Shopping Aug-10 Aug-10 Study tour for participatory water management in R upper watershed A P UWFM/TRG1-3 Lot 1 MOJA A1 Shopping Aug-10 Aug-10 Karsang Rood Visit of participatory management projects R Lafour A Apr-10 Apr-10 P UWFM/TRG1-3 Lot 2 MOJA A1 Shopping Aug-10 Aug-10 Karsang Rood Visit of participatory management projects R Lafour A Feb-10 Mar-10 P UWFM/TRG1-4 MOJA A1 QCBS Jun-09 Jun-09 Azad -Rayaneh ARC GIS (Primary and Advance) R Shargh Institute A Dec-09 Dec-09 P UWFM/TRG1-5 MOJA A1 QCBS Dec-10 Dec-10 Determine Boundaries & Forest & Rangeland R Ecologies & Their Indicators A P UWFM/TRG1-6 MOJA A1 QCBS Jun-11 Jun-11 Forest Inventory and Sampling R A P UWFM/TRG1-7 MOJA A1 QCBS Nov-10 Nov-10 Forest Road Network In Forest Management Plans R A P UWFM/TRG1-8 MOJA A1 QCBS Feb-10 Feb-10 Identification of Soil Erosion in Foresty Areas R A P UWFM/TRG1-9 MOJA A1 QCBS Aug-10 Aug-10 Principles of M&E for Natural Resourses Master R Plan A P UWFM/TRG1-10 MOJA A1 QCBS Jul-10 Jul-10 Ecotourism & National Parks R A P UWFM/TRG1-11 MOJA A1 SSS Sep-10 Sep-10 Participatory Rangeland Management ( R International Study Tour) A P UWFM/TRG1-12 MOJA A1 SSS Jan-11 Jan-11 Sustainable Forestry Management with Stakeholders R Participation ( International Study Tour) A P UWFM/TRG2-1 MOJA A1 QCBS Dec-11 Dec-11 The Principle of Designing Meshed Concrete in R Forced Concret Cheek Dam A P UWFM/TRG2-2 MOJA A1 QCBS May-10 May-10 The Principle of Marking in Un even age High R Forest management Plan A P UWFM/TRG2-3 MOJA A1 QCBS Jul-10 Jul-10 Designing & Networking of Eskiderood Roads & R Their Operation & Maintanance A P UWFM/TRG2-4 MOJA A1 QCBS Sep-10 Sep-10 Silviculture in Natural & Cultivated Forest R A P UWFM/TRG2-5 MOJA A1 QCBS Mar-10 Mar-10 Examine, Control & Fixing Earth Mass Movement in R Forest Slopped Down Hills Forest Slopped Down Hills A P UWFM/TRG2-6 MOJA A1 QCBS Aug-09 Aug-09 Azad -Rayaneh Azad -Rayaneh Data Analysis R Shargh Institute A Jan-10 Jan-10 P UWFM/TRG2-7 MOJA A1 QCBS Apr-10 Apr-10 Image Sattelite Analysis R A P UWFM/TRG3-1 MOJA A1 QCBS May-08 May-08 Implementation of Forestry Design With R Mehr Inrtitute Stakeholder's Participation A Jun-09 Jun-09 P UWFM/TRG3-2 MOJA A1 QCBS Sep-08 Sep-08 Watersched Management Implementation Training and Implementation of Light Check Dam by Local R Mehr Inrtitute Communities and NGO's A Jun-09 Jun-09 P UWFM/TRG3-3 MOJA A1 QCBS Nov-08 Nov-08 Implementation of Rangeland Projects with R Mehr Inrtitute Stakeholders Participation A Nov-08 Nov-08 P UWFM/TRG3-4 MOJA A1 QCBS Oct-08 Oct-08 Workshop on Developing Small Economic Projects R Mehr Inrtitute (BWF) A Jun-09 Jun-09 P UWFM/TRG3-5 MOJA A1 QCBS Nov-10 Nov-10 Statistical Methods In Analysing Natural Resourses R Project A P UWFM/TRG3-6 MOJA A1 QCBS Jul-10 Jul-10 Information Desimination Theqniques, Protection R Principles and Sustainablity of Natural Resourses A P UWFM/TRG3-7 MOJA A1 QCBS May-10 May-10 Principles of Planning for Watersched Integrated Management Projest with respect to Sustainable R Development A MOJA Subtotal MRWC Both PIUs B. Irrigation and Drainage Management P IDM/TRG1-1 Lot 1 MOJA B1-b SSS Jun-10 Jun-10 Study Tour River Basin Management CHINA R A P IDM/TRG1-1 Lot 2 MRWC B1-a SSS Jun-09 Jun-09 Study Tour River Basin Management CHINA R CIDDC A P IDM/TRG1-2 MOJA B2 SSS Sep-04 Sep-04 Study Tour WUA Morocco R Morocco A Sep-04 Sep-04 P IDM/TRG1-3 MRWC B1-a SSS Sep-10 Sep-10 Introduction of AILWMP and Water Management R Issues A Visit of Modern Irrigation & Drainage Systems ( P IDM/TRG1-4 Lot1 MOJA B1-b SSS Nov-10 Nov-10 Rehabilitation Scheme & Assessment of operation R Management )& Delta Project (International Study Visit) A Visit of Modern Irrigation & Drainage Systems ( P IDM/TRG1-4 Lot2 MRWC B1-a SSS Nov-10 Nov-10 Rehabilitation Scheme & Assessment of operation R Management )& Delta Project (International Study Visit) A P IDM/TRG1-5 Lot1 MOJA B1-b SSS Aug-11 Aug-11 Technology Transfer in Participatory Irrigation & R Drainage Networks(International Study Visit) A P IDM/TRG1-5 Lot2 MRWC B1-a SSS Aug-11 Aug-11 Technology Transfer in Participatory Irrigation & R Canceled Drainage Networks(International Study Visit) A P IDM/TRG1-6 MOJA B1-b SSS Oct-10 Oct-10 Green house Irrigation systems(International Study R Visit) A P IDM/TRG1-6 MRWC B1-a SSS Oct-10 Oct-10 Green house Irrigation systems(International Study R Canceled Visit) A P IDM/TRG2-1 Lot1 MOJA B3 QCBS Dec-08 Dec-08 Sabz Azin Participatory Development Courses R Bahnamir A Dec-08 Dec-08 P IDM/TRG2-1 Lot2 MOJA B3 SSS Jul-10 Jul-10 Participatory Development Courses R A P IDM/TRG2-2 MOJA B3 QCBS May-09 May-09 Javan Keshavarz Gardening R Tabarestan Sari A P IDM/TRG2-3 Lot 1 MOJA B3 QCBS Jun-10 Jun-10 Field Farmer School (Rice) R A P IDM/TRG2-3 Lot 2 MOJA B3 QCBS Jul-10 Jul-10 Field Farmer School (Citros) R A P IDM/TRG2-3 Lot 3 MOJA B3 QCBS Aug-10 Aug-10 Field Farmer School (Other Products) R A P IDM/TRG2-3 Lot 4 MOJA B3 QCBS Sep-10 Sep-10 Field Farmer School R A P IDM/TRG2-14 MOJA B1-b SSS May-11 May-11 Study tour for Water User R Associations(International Study Visit) A P IDM/TRG2-15 MRWC B1-a SSS May-11 May-11 Study tour for Water User R Associations(International Study Visit) A P IDM/TRG2-16 MOJA B2 SSS Dec-10 Dec-10 Training for extension agent(International Study R Visit) A P IDM/TRG2-17 MOJA B2 SSS Jul-11 Jul-11 Training for agronomy and research(International Training for agronomy and research(International R Study Visit) A P IDM/TRG2-18 MOJA B2 QCBS Dec-11 Oct-12 WUA Training activities R A P IDM/TRG2-19 MOJA B2 QCBS Dec-11 Oct-12 Training for extension centers R A Subtotal MOJA Subtotal MRWC Total Both PIUs C. Integrated Water Resources Management P IWRM/TRG1-1 MRWC C4 SS Jun-09 Jun-09 Study tour for visiting the similar projects (Such as Saraj Tourisem R Moghan, etc.) Agency A Jun-09 Jun-09 P IWRM/TRG1-2 MRWC C4 QCBS Jul-10 Jul-10 River Management & Planing R A P IWRM/TRG1-3 MRWC C4 QCBS Aug-10 Aug-10 Water Use and Demand Management R A P IWRM/TRG1-4 MRWC C4 QCBS May-10 May-10 Rights & Boundaries of Water Resource R A P IWRM/TRG1-5 MRWC C4 QCBS Oct-10 Oct-10 Water rights from the Economic Management View R Point A P IWRM/TRG1-6 MRWC C4 QCBS Sep-11 Sep-11 River Engineering R A P IWRM/TRG1-7 MRWC C4 QCBS Oct-11 Oct-11 Practical Methods of River Bank Protection R A P IWRM/TRG1-8 MRWC C4 QCBS Mar-10 Mar-10 Flood Management R A P IWRM/TRG1-9 MRWC C4 QCBS Dec-10 Dec-10 Water Quality Monitoring R A P IWRM/TRG1-10 MRWC C4 QCBS Nov-10 Nov-10 Groundwater Quality & quantity models R A P IWRM/TRG1-11 MRWC C4 QCBS Jun-11 Jun-11 Operation and Maintanance I&D Networks R A P IWRM/TRG1-12 MRWC C4 SSS Nov-10 Nov-10 Field Visit to Alborz Irrigation System R A P IWRM/TRG1-13 MOJA C2 QCBS Jun-09 Feb-10 Rayane Shargh IT Data Base R Institute A Jul-10 Mar-11 P IWRM/TRG1-14 MOJA C2 QCBS Dec-09 Oct-10 GIS/RS R A P IWRM/TRG1-15Lot 1 MOJA C2 SSS Sep-10 Sep-10 BWSC ( Introduction to BWSC Structure & Responsibility ) ( international Study Visit) R A P IWRM/TRG1-16 Lot1 MRWC C4 SSS Sep-10 Sep-10 BWSC ( Introduction to BWSC Structure & Responsibility ) ( international Study Visit) R A P IWRM/TRG1-17 Lot1 MOJA C2 SSS Sep-11 Sep-11 MIS/GIS (International Course) R A P IWRM/TRG1-17 Lot2 MRWC C4 SSS Sep-11 Sep-11 MIS/GIS (International Course) R Canceled A Subtotal MOJA Subtotal MRWC Total Both PIUs D. Environmental Management P EM/TRG4-1 MOJA D1 QCBS Jul-11 Jul-11 Zoning of Region's endangered Habitate R A P EM/TRG4-2 MRWC D2 QCBS Dec-10 Dec-10 Identification of Pollution & Threetening Factors on R Wetlands" Ecological & Biological Conditions A P EM/TRG4-3 MOJA D1 QCBS Jul-09 Jul-09 Training of Laboratory Sampling Techniques R A P EM/TRG4-4 MOJA D1 QCBS Aug-09 Aug-09 Ways of Aquatics Sampling and Factors of Their R Threats A P EM/TRG5-1 MOJA D1 QCBS Aug-10 Aug-10 Modern Forestry and Conservation of Plant and R Animal Species A P EM/TRG6-1 MRWC D2 QCBS Sep-10 Sep-10 Environmental Assessment of the Projects, according R to the WB's safeguards A P EM/TRG6-2 MOJA D1 QCBS Sep-10 Sep-10 Method of survays & Identification of Wildlife R A P EM/TRG6-3 MRWC D2 QCBS Oct-10 Oct-10 Surface Water Management R A P EM/TRG6-4 MRWC D2 QCBS Jan-11 Jan-11 Monitoring Techniques (River & Ab-bandan) R A P EM/TRG6-5 MRWC D2 QCBS Nov-10 Nov-10 Laboratory Data Analysis R A P EM/TRG6-6 MRWC D2 QCBS Jun-11 Jun-11 Introduction to Heavy Metal Pollution Resourses & R Their Negative Effects A P EM/TRG6-7 Lot1 MOJA D1 SSS Feb-11 Feb-11 Environmental Management (InternationalCourse) R A P EM/TRG6-7 Lot2 MRWC D2 SSS Feb-11 Feb-11 Environmental Management (International Course) R A P EM/TRG6-8 Lot1 MOJA D1 SSS May-11 May-11 River Management(International Course) R A P EM/TRG6-8 Lot2 MRWC D2 SSS May-11 May-11 River Management(International Course) R A P EM/TRG6-9 Lot1 MOJA D1 SSS Jan-12 Jan-12 Monitoring and Sampling Techniques (International R Course) A P EM/TRG6-9 Lot2 MRWC D2 SSS Jan-12 Jan-12 Monitoring and Sampling Techniques (International R Course) A Subtotal MOJA Subtotal MRWC Total Both PIUs E. Project Implementation and Coordination Support P PICS/TRG1-1 CLO E1 Shopping Jun-09 Jun-11 Allameh Ghotbe Foreign Language Course R Ravandi A Jun-09 P PICS/TRG1-2 CLO E1 CQS May-10 May-11 Training for CLO Staff (ComputerCourses,Project Training for CLO Staff (ComputerCourses,Project R Management) A P PICS/TRG1-7 Lot 1 CLO E1 SS 2004 Procuremrnt Methods (Italy) R ILO A P PICS/TRG1-7 Lot 2 CLO E1 SS 2005 Procuremrnt Methods (India) R ASCI A P PICS/TRG1-7 Lot 3 CLO E1 SS 2005 Financial Management (Italy) R ILO A P PICS/TRG1-8 CLO E1 Shopping Sep-09 Sep-09 Aryan Parse- Procurement and Financial Methods R Kish A Jan-10 Jan-10 P PICS/TRG2-1 Lot 1 MRWC E2 QCBS Feb-08 Dec-09 Shokouh Foreign Language Course R Azandaran Institute A Feb-08 Dec-09 P PICS/TRG2-1 Lot 2 MOJA E1 QCBS Jul-08 Oct-08 Foreign Language Course R Kish Institute A Jul-08 Oct-08 P PICS/TRG2-1 Lot 3 MOJA E1 QCBS Jan-09 Sep-09 Rohame Foreign Language Course R Tabarestan Institute A Jan-09 Sep-09 P PICS/TRG2-2 Lot 1 MRWC E2 QCBS Nov-08 Nov-08 Tehran Software Training (MS-Project) (Primary ) R Thechnical Institute A Nov-08 Nov-08 P PICS/TRG2-2 Lot 2 MOJA E1 QCBS Nov-08 Jan-09 Industrial Software Training (MS-Project) (Primary ) R Management Centere A Nov-08 Jan-09 P PICS/TRG2-2 Lot 3 MRWC E2 QCBS May-10 Jun-10 Software Training (MS-Project) (Advance ) R A P PICS/TRG2-2 Lot4 MOJA E1 QCBS May-10 Jun-10 Software Training (MS-Project) (Advance ) R A P PICS/TRG2-3 Lot 1 MOJA E1 QCBS Jan-09 Sep-09 Software Training (ICDL) R Is-Iran Institute A Jan-09 Sep-09 P PICS/TRG 2-4 MRWC E2 SSS Mar-99 Mar-09 World Bank M&E Workshop R Institute A Mar-09 Mar-09 P PICS/TRG2-5 Lot1 MRWC E2 SSS Sep-11 Sep-11 Procurement and Financial Management R Canceled (International Course) A P PICS/TRG2-5 LOt2 MOJA E1 SSS Sep-11 Sep-11 Procurement and Financial Management R (International Course) A P PICS/TRG2-6Lot1 MRWC E2 SSS Jan-11 Jan-11 M&E (International Course) R Canceled A P PICS/TRG2-6 Lot2 MOJA E1 SSS Jan-11 Jan-11 M&E (International Course) R A Subtotal MOJA Subtotal MRWC Total Both PIUs Source: Procurement plan, 11 December 2004.