PROCUREMENT PLAN (Textual Part) Project information: Dominican Republic Proyecto de Preparación para la Reducción de Emisiones por Deforestación y Degradación Forestal (REDD+) (P151752) Project Implementation agency: Ministry of Environment and Natural Resources Date of the Procurement Plan: February 8, 2018 Period covered by this Procurement Plan: 2017-2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Procurement Law 340-06 and its modifications, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables PROCUREMENT Dominican Republic : Dominican Republic. FCPF REDD+ Readiness Preparation Project PLAN General Information Country: Dominican Republic Bank’s Approval Date of the Original Procurement Plan: 2018-02-12 2021-04-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151752 GPN Date: Project Name: Dominican Republic. FCPF REDD+ Readiness Preparation Project Loan / Credit No: TF / A1121 Ministry of Environment and Natural Resources Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DO-MMARN-45696-GO-RFQ Pending Request for Single Stage - One / Gastos de Comunicación. TF / A1121 Post Open - National 8,000.00 0.00 Implementati 2017-07-15 2017-09-09 2018-03-08 Quotations Envelope Act. 5.18 on DO-MMARN-45704-GO-RFQ Pending Request for Single Stage - One / Camisas, polo-shirt y TF / A1121 Post Open - National 914.00 0.00 Implementati 2017-09-15 2017-11-10 2019-06-30 Quotations Envelope gorras. Act. 5.22 on DO-MMARN-44608-GO-RFQ Pending Request for Single Stage - One / Seguro de vehículos. Act TF / A1121 Post Open - National 8,443.00 0.00 Implementati 2017-08-15 2017-10-10 2019-06-30 Quotations Envelope 5.17 on DO-MMARN-45698-GO-RFQ / Mantenimiento y operación de vehículos (mano de obra, Request for Single Stage - One TF / A1121 Post Open - National 23,368.09 923.08 Signed 2017-08-15 2017-10-10 2019-08-26 2019-06-30 neumáticos, piezas, Quotations Envelope combustible, lubricantes). Act 5.16 DO-MMARN-45343-GO-RFB Under / Adquisición de 4 vehículos Single Stage - One TF / A1121 Prior Request for Bids Open - National 162,559.00 0.00 Implementati 2018-02-12 2018-02-17 2018-03-31 2018-04-30 2018-06-04 2018-12-01 para actividades de campo. Envelope on Act. 5.14 DO-MMARN-45381-GO-RFQ / Mobiliario de oficina Pending Request for Single Stage - One (cubículos con paneles y TF / A1121 Post Open - National 20,197.57 0.00 Implementati 2017-05-25 2017-07-20 2018-01-16 Quotations Envelope escritorios, archivo y sillas). on Varios Procesos. Act. 5.12 DO-MMARN-46702-GO-RFQ / Adquisición de materiales para la implementación de la Under Request for Single Stage - One estrategia de comunicación. TF / A1121 Post Open - National 70,000.00 0.00 Implementati 2018-09-22 2019-05-31 2019-05-31 Quotations Envelope (Camisetas, gorras, y on materiales, etc.). Act. 1b.2 - Varios Procesos DO-MMARN-44629-GO-RFQ / Adquisición Software Especializado para i) Pending Request for Single Stage - One Mecanismo de Quejas y TF / A1121 Post Open - National 36,397.00 0.00 Implementati 2017-10-25 2017-12-20 2018-12-31 Quotations Envelope Resolución de Conflicto on (MQRC), ii) la ONAMET iii) la DIARENA. Act. 1c.10 (1b.12) DO-MMARN-45356-GO-RFQ / Materiales fungibles (toners de impresoras y del ploter, Request for Single Stage - One TF / A1121 Post Open - National 21,840.00 2,011.63 Signed 2017-04-25 2017-06-20 2019-03-19 2017-12-17 resmas de papel, folders, Quotations Envelope grapadoras, etc). Varios procesos. Act. 5.19 DO-MMARN-44603-GO-RFQ / Equipos tecnológicos (laptops, computadoras, Under Request for Single Stage - One impresora, ploter, cámara TF / A1121 Post Open - National 96,620.00 0.00 Implementati 2017-05-20 2017-07-15 2018-01-11 Quotations Envelope fotográfica, proyector y disco on duro, UPS, etc.). Varios procesos. Act. 5.11 DO-MMARN-56172-GO-RFQ Pending / Adquisición de laptops, Request for Single Stage - One TF / A1121 Post Open - National 37,690.40 0.00 Implementati 2018-04-01 2018-05-27 2018-11-23 accesorios de computadoras, Quotations Envelope on licencias, etc. Act. 5.11 DO-MMARN-107167-GO- Pending Request for Single Stage - One RFQ / Adquisición de laptops, TF / A1121 Post Open - National 65,000.00 0.00 Implementati 2019-03-25 2019-05-20 2019-11-16 Quotations Envelope PC, proyectores, etc. Act. 511 on DO-MMARN-45358-GO-RFQ / Planta eléctrica para la Request for Single Stage - One TF / A1121 Post Open - National 0.00 0.00 Canceled 2017-07-15 2017-09-09 2018-03-08 Unidad de Monitoreo Forestal. Quotations Envelope Act. 5.23 DO-MMARN-110006-GO- Request for Single Stage - One RFQ / Adquisición de servidor TF / A1121 Post Open - National 46,200.00 46,122.94 Signed 2019-04-20 2019-06-15 2019-04-24 2019-12-12 Quotations Envelope para página Web REDD+. DO-MMARN-115467-GO- RFQ / Adquisición de Equipos Request for Single Stage - One TF / A1121 Post Open - National 68,017.00 51,057.80 Signed 2019-05-22 2019-07-17 2019-06-17 2020-01-13 2020-01-20 Tecnológicos desiertos del CP- Quotations Envelope 34. Act. 5.11 Page 1 NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DO-MMARN-45367-NC-RFQ Pending Request for Single Stage - One / Construcción de escenarios TF / A1121 Post Open - National 0.00 0.00 Implementati 2017-10-15 2017-12-10 2018-06-08 Quotations Envelope climáticos on DO-MMARN-45415-NC-RFQ / Visitas para la evaluación de desempeño del Personal de las Direcciones Provinciales y Pending Request for Single Stage - One Municipales, respecto a los TF / A1121 Post Open - National 0.00 0.00 Implementati 2018-02-20 2018-04-17 2018-10-14 Quotations Envelope aspectos de REDD+ el on mecanismo de quejas y reclamos entre otros. Act, 1c.7 DO-MMARN-45419-NC-RFQ / Diseño del Sistema de Monitoreo de múltiples Pending Request for Single Stage - One beneficios socio ambientales, TF / A1121 Post Open - National 0.00 0.00 Implementati 2017-08-06 2017-10-01 2018-03-30 Quotations Envelope gobernanza y potenciales on impactos. MRV (36 reuniones / 12 por año). DO-MMARN-51798-NC-RFQ Pending / R-Package - Difusión. La Request for Single Stage - One TF / A1121 Post Open - National 0.00 0.00 Implementati 2018-03-05 2018-04-30 2018-10-27 difusión la realizará el Quotations Envelope on consultor Pending DO-MMARN-51802-NC-RFQ Request for Single Stage - One TF / A1121 Post Open - National 20,000.00 0.00 Implementati 2018-03-05 2018-04-30 2019-06-30 / Imprevistos. Act. 5.25 Quotations Envelope on DO-MMARN-46713-NC-RFQ / Publicaciones para las Request for Single Stage - One TF / A1121 Post Open - National 13,016.14 1,301.32 Signed 2017-05-25 2017-07-20 2020-06-17 2019-06-30 adquisiciones. Varios Quotations Envelope procesos. 5.20 DO-MMARN-75991-NC-RFQ / Talleres de validación del R- Pending Request for Single Stage - One Package (1 nacional y 3 TF / A1121 Post Open - National 10,243.00 0.00 Implementati 2018-10-06 2018-12-01 2019-05-30 Quotations Envelope regionales). Varios procesos. on Act. 4a.5-1 DO-MMARN-46745-NC-RFQ / Logística para cursos en Pending Request for Single Stage - One Manejo de Bosques y Manejo TF / A1121 Post Open - National 40,000.00 0.00 Implementati 2018-11-06 2019-03-31 2019-03-31 Quotations Envelope de Áreas Protegidas. Varios on procesos. Act. 1a.7 DO-MMARN-76055-NC-RFQ / Talleres de validación de la Estrategia Nacional REDD+ (3 Request for Single Stage - One talleres regionales, una (1) TF / A1121 Post Open - National 8,100.00 1,016.18 Signed 2018-09-08 2018-11-03 2019-05-08 2019-05-02 Quotations Envelope consulta con expertos, 1 taller nacional). Varios procesos. 2a.9.1 DO-MMARN-44598-NC-RFQ / Curso en en Manejo de Request for Single Stage - One TF / A1121 Post Open - National 25,040.00 0.00 Canceled 2017-05-15 2017-07-10 2018-01-06 Bosques y Restauración de Quotations Envelope Paisajes Forestales. Act. 1a.5 DO-MMARN-51793-NC-RFQ / Reuniones de coordinación, Request for Single Stage - One TF / A1121 Post Open - National 8,500.00 1,670.44 Completed 2018-03-05 2018-04-30 2019-04-04 2019-06-30 2019-05-08 colaboración y seguimiento Quotations Envelope con instituciones clave. 1c.11 DO-MMARN-55993-NC-RFQ Pending Request for Single Stage - One / Lanzamiento de la Estrategia TF / A1121 Post Open - National 18,000.00 0.00 Implementati 2019-03-09 2019-03-17 2019-03-31 Quotations Envelope REDD+. Act. 2a.10 on DO-MMARN-46755-NC-RFQ Pending / Logística para los trabajos Request for Single Stage - One TF / A1121 Post Open - National 34,083.00 0.00 Implementati 2018-02-04 2018-04-01 2019-06-30 de campo (Viáticos y Quotations Envelope on transporte). Act. 2d.4 DO-MMARN-77298-NC-RFQ / Capacitación del personal nacional responsable del monitoreo y reporte de datos Pending concernientes a las emisiones Request for Single Stage - One TF / A1121 Post Open - National 2,000.00 0.00 Implementati 2018-10-06 2018-12-01 2019-05-30 por deforestación y Quotations Envelope on degradación forestal.. (cálculos establecimiento y actualización de los niveles de referencia). Act. 3.2 Pending DO-MMARN-51801-NC-RFQ Request for Single Stage - One TF / A1121 Post Open - National 5,500.00 0.00 Implementati 2018-03-05 2018-04-30 2018-10-27 / Gastos bancarios. Act. 5.24 Quotations Envelope on DO-MMARN-45087-NC-RFQ / Apoyo logístico de la UTG a los talleres de la Consultoría Request for Single Stage - One TF / A1121 Post Open - National 0.00 0.00 Canceled 2017-10-20 2017-12-15 2018-06-13 SESA con los actores Quotations Envelope involucrados (9 talleres). 1c.1 (1b.3). DO-MMARN-83528-NC-RFQ / Capacitación en Manejo de Request for Single Stage - One Áreas Protegidas en el TF / A1121 Post Open - National 25,040.00 0.00 Canceled 2018-11-03 2018-12-28 2019-06-26 Quotations Envelope contexto de Cambio Climático. Act. 1a.6 DO-MMARN-103655-NC- RFQ / Capacitación sobre Request for Single Stage - One ganadería compatible con TF / A1121 Post Open - National 26,718.00 0.00 Canceled 2019-01-07 2019-02-11 2019-02-28 Quotations Envelope cambio climático. Varios procesos. Act. 1a.8 Page 2 DO-MMARN-83542-NC-RFQ / Días de Campo con sectores Request for Single Stage - One Ganadería, Café y Cacao y TF / A1121 Post Open - National 30,000.00 7,359.05 Signed 2019-01-07 2019-02-12 2019-07-17 2019-06-28 2019-09-04 Quotations Envelope Forestal (5 días de campo). Varios procesos. Act. 2d.5 DO-MMARN-45412-NC-RFQ / Implementación de la Request for Single Stage - One estrategia de comunicación. TF / A1121 Post Open - National 42,000.00 37,607.55 Signed 2017-10-06 2017-12-01 2019-05-28 2018-05-30 Quotations Envelope (divulgación en radio). Act. 1b.2 DO-MMARN-83641-NC-DIR / Curso Teórico-Práctico Sobre Sistema de Información Pending Geográfica (SIG) y Elaboración TF / A1121 Post Direct Selection Direct 21,406.00 0.00 Implementati 2018-10-29 2018-11-03 2018-12-08 2019-03-08 de Mapa con Áreas de Acción on REED+ por Región de Planificación DO-MMARN-103666-NC-DIR / Talleres de Validación de la Estrategia Nacional REDD+ (3 TF / A1121 Post Direct Selection Direct 900.00 0.00 Canceled 2019-02-28 2019-02-25 2019-03-05 2019-04-09 2019-10-06 talleres regionales, Una consulta con expertos, 1 taller nacional - Azua DO-MMARN-107002-NC- RFB / Implementación de la Under estrategia de comunicación. Single Stage - One TF / A1121 Prior Request for Bids Open - National 157,198.00 0.00 Implementati 2019-03-19 2019-03-24 2019-05-05 2019-06-04 2019-07-09 2020-01-05 (Materiales impresos, Envelope on brochures, entre otros). Act. 1b.2 DO-MMARN-46724-NC-RFQ / Reuniones de de trabajo Request for Single Stage - One extraordinarias de los TF / A1121 Post Open - National 15,367.00 961.07 Signed 2018-02-10 2018-04-07 2019-03-03 2019-06-30 Quotations Envelope Comités Especiales. (Varios procesos). 1a.3 DO-MMARN-110856-NC- Pending Request for Single Stage - One RFQ / Reuniones del CD 2 TF / A1121 Post Open - National 1,901.00 0.00 Implementati 2019-04-21 2019-06-16 2019-12-13 Quotations Envelope reuniones. Act.1a.2 on DO-MMARN-110858-NC- Pending Request for Single Stage - One RFQ / Reuniones ordinarias TF / A1121 Post Open - National 8,345.00 0.00 Implementati 2019-04-21 2019-06-16 2019-12-13 Quotations Envelope del CTA. 4 por año. 1a.1 on DO-MMARN-107007-NC-DIR Pending / Taller Retroalimentación TF / A1121 Post Direct Selection Direct 1,500.00 0.00 Implementati 2019-03-19 2019-03-24 2019-04-28 2019-10-25 PMA`s en Áreas Prioritarias - on Santiago Rodríguez. Act. 1a.9 DO-MMARN-107005-NC-DIR / Taller Retroalimentación TF / A1121 Post Direct Selection Direct 1,500.00 834.81 Signed 2019-03-19 2019-03-20 2019-03-24 2019-03-13 2019-04-28 2019-03-21 2019-10-25 PMA`s en Áreas Prioritarias - San Fco. Macorís. 1a.9 DO-MMARN-107008-NC-DIR Pending / Taller Retroalimentación TF / A1121 Post Direct Selection Direct 1,500.00 0.00 Implementati 2019-03-19 2019-03-24 2019-04-28 2019-10-25 PMA`s en Áreas Prioritarias - on Las Matas de Farfán. Act 1a.9 DO-MMARN-107006-NC-DIR / Taller Retroalimentación TF / A1121 Post Direct Selection Direct 1,500.00 2,030.34 Signed 2019-03-19 2019-03-12 2019-03-24 2019-03-12 2019-04-28 2019-04-17 2019-10-25 PMA`s en Áreas Prioritarias - Azua. Act 1a.9 DO-MMARN-107010-NC-DIR Pending / Taller Retroalimentación TF / A1121 Post Direct Selection Direct 1,500.00 0.00 Implementati 2019-03-19 2019-03-24 2019-04-28 2019-10-25 PMA`s en Áreas Prioritarias - on Cotui Act 1a.9 DO-MMARN-125946-NC-DIR / Adquisición de Servicios de Under Capacitación Cursos TF / A1121 Prior Direct Selection Direct 237,315.72 0.00 Implementati 2019-08-01 2019-10-04 2019-08-06 2019-09-10 2020-03-08 Ganadería Sostenible, Manejo on Forestal Sostenible y Manejo Áreas Protegidas DO-MMARN-138186-NC-DIR / Alojamiento para personal en Duodécima Reunión de la Asamblea de Participantes Pending (PA12) y Vigésima Octava TF / A1121 Post Direct Selection Direct 5,100.00 0.00 Implementati 2019-10-02 2019-10-07 2019-11-11 2020-05-09 (PC28) Reunión Comité on Participantes Fondo Cooperativo para el Carbono de los Bosques DO-MMARN-39906-NC-RFQ / Actividades de participación Request for Single Stage - One en eventos TF / A1121 Post Open - International 10,367.00 3,772.37 Signed 2018-03-14 2018-05-09 2019-06-25 2018-11-05 Quotations Envelope internacionales.Act. 1c.8 (1b.10) - Varios procesos DO-MMARN-100643-NC- Request for Single Stage - One RFQ / Logística para talleres. TF / A1121 Post Open - National 42,311.00 468.68 Signed 2019-02-18 2019-04-15 2019-12-10 2019-06-30 Quotations Envelope 1a.9 Varios procesos DO-MMARN-153239-NC-DIR Pending / Taller Consulta PDB en San TF / A1121 Post Direct Selection Direct 1,676.00 0.00 Implementati 2020-01-09 2020-01-14 2020-02-18 2020-08-16 Francisco de Macorís. Act. on 1a.7 (antes 1a.8) DO-MMARN-154380-NC-DIR Pending / Desayuno y almuerzo taller TF / A1121 Post Direct Selection Direct 1,558.00 0.00 Implementati 2020-01-17 2020-01-22 2020-02-26 2020-08-24 consulta PDB en Santiago on Rodríguez. Act. 1a.7 Page 3 DO-MMARN-154384-NC-DIR Pending / Desayuno y almuerzo taller TF / A1121 Post Direct Selection Direct 825.00 0.00 Implementati 2020-01-17 2020-01-22 2020-02-26 2020-08-24 consulta PDB en Cotui. Act. on 1a.7 DO-MMARN-159241-NC- RFQ / Impresión Manual de Reforestación en el marco de Pending Request for Single Stage - One REDD+ (incluyendo sección de TF / A1121 Post Open - National 1,773.58 0.00 Implementati 2020-05-09 2020-07-04 2020-10-30 Quotations Envelope salvaguardas). Act. 1c3.2c on Subcomponente 1c, Procesos de Consulta y Participación DO-MMARN-159247-NC- RFQ / Impresión manual de sistema café bajo sombra en Pending el marco de REDD+ Request for Single Stage - One TF / A1121 Post Open - National 1,773.58 0.00 Implementati 2020-02-19 2020-04-15 2020-10-30 (incluyendo sección de Quotations Envelope on Salvaguardas). Act. 1c3.2.e Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159250-NC- RFQ / Impresión manual de sistemas silvopastoriles en el Pending marco de REDD+ (incluyendo Request for Single Stage - One TF / A1121 Post Open - National 1,173.58 0.00 Implementati 2020-06-06 2020-08-01 2020-10-30 sección de Salvaguardas). Act. Quotations Envelope on 1c3.2.f Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159268-NC- RFQ / Impresión manual de sistema café bajo sombra en Pending el marco de REDD+ Request for Single Stage - One TF / A1121 Post Open - National 1,773.58 0.00 Implementati 2020-05-08 2020-07-03 2020-10-01 (incluyendo sección de Quotations Envelope on Salvaguardas). Act. 1c3.2.a Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159278-NC- RFQ / Impresión manual de manejo forestal sostenible en Pending el marco de REDD+ Request for Single Stage - One TF / A1121 Post Open - National 1,773.58 0.00 Implementati 2020-06-19 2020-08-14 2020-11-12 (incluyendo sección de Quotations Envelope on Salvaguardas). Act. 1c3.2.b Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159286-NC- RFQ / Impresión Manual de sistema cacao bajo sombra en Pending el marco de REDD+ Request for Single Stage - One TF / A1121 Post Open - National 1,773.58 0.00 Implementati 2020-07-06 2020-08-31 2020-10-30 (incluyendo sección de Quotations Envelope on Salvaguardas). Act. 1c3.2.d Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159292-NC- RFQ / Impresión manual de regeneración natural en zonas Pending degradadas en el marco de Request for Single Stage - One TF / A1121 Post Open - National 1,773.58 0.00 Implementati 2020-08-07 2020-10-02 2020-10-30 REDD+ (incluyendo sección de Quotations Envelope on Salvaguardas). Act. 1c3.2.g Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159298-NC- RFQ / Manual de plantaciones dendroenergéticas en el Pending Request for Single Stage - One marco de REDD+ (incluyendo TF / A1121 Post Open - National 1,773.58 0.00 Implementati 2020-08-19 2020-10-14 2020-10-30 Quotations Envelope sección de Salvaguardas). Act. on 1c3.2.h Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159303-NC- RFQ / Manual de conservación de bosques en áreas Pending protegidas en el marco de Request for Single Stage - One TF / A1121 Post Open - National 1,773.58 0.00 Implementati 2020-08-07 2020-09-07 2020-09-27 REDD+ (incluyendo sección de Quotations Envelope on Salvaguardas). Act. 1c3.2.i Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159306-NC- RFQ / Impresión de la Guía para el uso adecuado de Pending plaguicidas y la correcta Request for Single Stage - One TF / A1121 Post Open - National 1,773.58 0.00 Implementati 2020-08-25 2020-09-19 2020-10-09 disposición de envases. Act. Quotations Envelope on 1c3.2.j Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159308-NC- Pending Request for Single Stage - One RFQ / Manejo de aspectos TF / A1121 Post Open - National 2,264.15 0.00 Implementati 2020-02-17 2020-04-13 2020-10-30 Quotations Envelope financieros on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DO-MMARN-45422-CS-CQS / Diseño de una estrategia de comunicación nacional para Consultant Pending REDD, más analisis y TF / A1121 Post Qualification Open - National 50,000.00 0.00 2017-08-30 2017-09-20 2017-11-03 2017-12-03 2018-01-07 2018-07-06 Implementation propuesta de mejora a Selection plataforma web del proyecto. Act. 1b.1 Page 4 DO-MMARN-51385-CS-CQS / Establecimiento de nivel de referencia, estimación del Consultant potencial de reducción de TF / A1121 Post Qualification Open - National 327,957.00 0.00 Canceled 2018-03-05 2018-03-26 2018-03-26 2018-05-09 2018-06-08 2018-07-13 2019-01-09 emisiones/aumento de Selection reservorios y sistema de monitoreo de emsiones forestales. 3.1 DO-MMARN-45095-CS-CQS Consultant Pending / Diseño de base de datos TF / A1121 Post Qualification Open - National 0.00 0.00 2018-02-01 2018-02-22 2018-04-07 2018-05-07 2018-06-11 2018-12-08 Implementation para MRV. Selection DO-MMARN-46717-CS-CQS / Establecimiento del marco logico y acuerdos institucionales necesarios Consultant para MRV. Desarrollo de una Pending TF / A1121 Post Qualification Open - International 0.00 0.00 2017-05-10 2017-05-31 2017-07-14 2017-08-13 2017-09-17 2018-03-16 plataforma de informacion Implementation Selection prototipo para monitorear los bosques y actividades UTCUTS (Uso de la Tierra, Cambio Uso de la Tierra y Silvicultura). DO-MMARN-45376-CS-CQS / Soporte tecnico para el desarrollo y envio del nivel de Consultant referencia (REL/FREL) a la Pending TF / A1121 Post Qualification Open - National 0.00 0.00 2017-08-01 2017-08-22 2017-10-05 2017-11-04 2017-12-09 2018-06-07 UNFCCC. Generar factores de Implementation Selection expansión y/o ecuaciones alométricas por tipo de bosque. DO-MMARN-46708-CS-CQS / Análisis de las causas directas e indirectas (Drivers) de deforestación y degradación de los bosques Consultant Pending (DD) en Rep. Dom. y TF / A1121 Post Qualification Open - International 182,304.00 0.00 2017-05-15 2017-06-05 2017-07-19 2017-08-18 2017-09-22 2018-03-21 Implementation Propuestas de alternativas de Selection uso sostenible del suelo que disminuyen la DD aumentan los reservorios de carbono. Act. 2a.1 2a.2 2a.3 DO-MMARN-45407-CS-CQS / Propiedad del carbono forestal, sistema de registro y Consultant Pending transferencia de titulos de TF / A1121 Post Qualification Open - National 0.00 0.00 2017-08-01 2017-08-22 2017-10-05 2017-11-04 2017-12-09 2018-06-07 Implementation reduccion de emisiones en Selection Republica Dominicana. Act. 2c.2 DO-MMARN-55977-CS-CQS / Estudio sobre condiciones ambientales y sociales a nivel Consultant nacional y a nivel local en las TF / A1121 Post Qualification Open - International 0.00 0.00 Canceled 2018-03-26 2018-04-16 2018-05-30 2018-06-29 2018-08-03 2019-01-30 zonas específicas de Selection intervención y Planes de Manejo de dichas áreas. 1c2 )1b.5). Enmienda MGAS DO-MMARN-45082-CS-CQS / Desarrollo del Mecanismo de Quejas y Solución de Consultant Conflictos. Consultoría para el Pending TF / A1121 Post Qualification Open - International 334,535.00 0.00 2017-08-15 2017-09-05 2017-10-19 2017-11-18 2017-12-23 2018-12-18 desarrollo del Marco de Implementation Selection Gestión Ambiental y Social (MGAS) para REDD+ Act.1c.2 (1b.5) DO-MMARN-51796-CS-CQS Consultant / Análisis de impacto de TF / A1121 Post Qualification Open - International 33,446.71 0.00 Canceled 2018-02-28 2019-08-25 2018-03-21 2018-05-04 2018-06-03 2018-07-08 2019-01-04 empleos verdes. 2a.11 Selection Consultant DO-MMARN-67606-CS-CQS TF / A1121 Post Qualification Open - National 0.00 0.00 Canceled 2018-07-16 2018-08-06 2018-09-19 2018-10-19 2018-11-23 2019-05-22 / Culminación MRV (Act. 3.2) Selection DO-MMARN-39916-CS-CQS / Evaluación de los Costos y Beneficios y Preparación de un Plan de Financiación para el Consultant Pending Programa de Reducción de TF / A1121 Post Qualification Open - National 53,701.00 0.00 2017-12-08 2017-12-29 2018-02-11 2018-03-13 2018-04-17 2018-10-14 Implementation Emisiones en República Selection Dominicana. Análisis de la brecha financiera. Act. 2a.4 y 2a.5 DO-MMARN-39915-CS-CQS / Inventario de No Bosque de Consultant la República Dominicana. Pending TF / A1121 Post Qualification Open - National 203,114.71 0.00 2017-12-08 2017-12-29 2018-02-11 2018-03-13 2018-04-17 2018-10-14 Evaluación del contenido de Implementation Selection Biomasa y Carbono ..... Act. 4a.6 DO-MMARN-45362-CS- Quality And Cost- Under QCBS / Evaluaciones externas TF / A1121 Post Open - National 15,888.00 0.00 2017-04-01 2021-01-07 2017-04-22 2017-06-05 2021-01-07 2017-07-03 2017-08-02 2017-09-06 2017-10-11 2018-10-11 Based Selection Implementation y auditorias anuales. Act. 5.3 DO-MMARN-39912-CS- QCBS / Elaboración del Quality And Cost- Pending Inventario Nacional Forestal TF / A1121 Post Open - International 538,870.00 0.00 2017-12-08 2017-12-29 2018-02-11 2018-03-11 2018-04-10 2018-05-15 2018-06-19 2019-06-19 Based Selection Implementation de la República Dominicana (INF-RD). Act. 4a.3 DO-MMARN-75965-CS-CQS Consultant / Plataforma WEB Registro de TF / A1121 Post Qualification Open - National 55,000.00 0.00 Canceled 2020-03-29 2020-04-17 2020-04-19 2020-06-02 2020-07-02 2020-08-06 2020-09-26 Proyectos, Programas y Selection Participantes. (Act. 4b.2) DO-MMARN-208156-CS- CQS / Diseño e Consultant implementación del Sistema Under TF / A1121 Post Qualification Open - National 55,000.00 0.00 2020-12-04 2020-12-08 2020-12-25 2021-02-07 2021-02-24 2021-03-09 2021-04-13 2021-10-10 Nacional de Registro de Implementation Selection Programas, Proyectos y Acciones REDD+. Act. 4b.1 Page 5 DO-MMARN-51794-CS-CQS / Diseño e implementación Consultant Under del Sistema de Información de TF / A1121 Post Qualification Open - International 60,000.00 0.00 2020-12-04 2020-12-08 2020-12-25 2021-02-07 2021-02-26 2021-03-09 2021-04-13 2021-10-10 Implementation Salvaguardas REDD+ (SIS). Selection 1c.4 DO-MMARN-208159-CS- CQS / Diseño e implementación del Sistema Consultant Under de Atención a Quejas, TF / A1121 Post Qualification Open - National 65,000.00 0.00 2020-12-04 2020-12-08 2020-12-25 2021-02-07 2021-03-01 2021-03-09 2021-04-15 2021-04-13 2021-10-10 Implementation Reclamos y Manejo de Selection Conflictos en el Marco de REDD+ (SQRC). Act. 1c.5 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DO-MMARN-45411-CS-INDV Individual Pending / Especialista en TF / A1121 Post Consultant Open 0.00 0.00 2017-08-01 2017-09-19 2017-10-10 2017-11-14 2018-05-13 Implementation Comunicaciones Selection DO-MMARN-67601-CS-INDV / Establecimiento de nivel de referencia, estimación del Individual potencial de reducción de Pending TF / A1121 Post Consultant Open 61,644.00 0.00 2018-06-14 2018-08-02 2018-08-23 2018-09-27 2019-03-26 emisiones/aumento de Implementation Selection reservorios y sistema de monitoreo de emisiones forestales. 3.1 DO-MMARN-67607-CS-INDV / Desarrollo de un Estudio de Individual Género para REDD+ (Act. Esta TF / A1121 Post Consultant Open 0.00 0.00 Canceled 2018-07-16 2018-09-03 2018-09-24 2018-10-29 2019-04-27 consultoría la cubrirá el Banco Selection Mundial. 1c.3) DO-MMARN-75815-CS-INDV Individual / Revisor y analista de TF / A1121 Post Consultant Open 14,174.00 43,014.68 Signed 2018-08-27 2018-08-28 2018-10-01 2019-01-01 2018-10-22 2019-01-01 2018-11-26 2019-01-01 2019-05-25 informes técnicos (área Selection biofísica) (Act. 5.28) DO-MMARN-83548-CS-INDV Individual / Técnico en Uso de Suelo, TF / A1121 Post Consultant Open 28,690.64 42,427.63 Signed 2017-12-12 2017-10-20 2018-01-30 2017-10-20 2018-02-20 2018-03-27 2017-12-12 2019-06-30 Agricultura y Bosque. Act. Selection 5.10 Individual DO-MMARN-50912-CS-INDV Pending TF / A1121 Post Consultant Open 29,507.00 0.00 2017-12-12 2018-01-30 2018-02-20 2018-03-27 2019-06-30 / Técnico Social. Act. 5.9 Implementation Selection DO-MMARN-50898-CS-INDV Individual / Chófer Apoyo logístico 2. TF / A1121 Post Consultant Open 15,424.54 25,167.03 Signed 2017-06-27 2017-05-01 2017-08-15 2017-08-18 2017-09-05 2017-07-01 2017-10-10 2017-07-03 2019-06-30 Act. 5.8 Selection DO-MMARN-50906-CS-INDV Individual / Chófer. Apoyo logístico 1. TF / A1121 Post Consultant Open 15,447.33 21,579.62 Signed 2017-07-03 2017-03-31 2017-08-21 2017-05-01 2017-09-11 2017-06-27 2017-10-16 2017-06-27 2019-06-30 Act. 5.7 Selection DO-MMARN-50873-CS-INDV Individual / Secretaria Administrativa. TF / A1121 Post Consultant Open 49,439.13 16,693.73 Completed 2016-10-21 2016-08-01 2016-12-09 2016-10-22 2016-12-30 2017-10-23 2017-02-03 2017-10-23 2019-06-30 2018-06-01 Act. 5.6 Selection DO-MMARN-50883-CS-INDV Individual / Encargado de Operaciones. TF / A1121 Post Consultant Open 64,870.40 55,748.51 Completed 2017-02-23 2019-06-17 2017-04-13 2017-02-13 2017-05-04 2017-02-13 2017-06-08 2017-02-23 2019-06-30 2019-06-30 Act. 5.5 Selection DO-MMARN-50858-CS-INDV Individual / Especialista Financiero. Act. TF / A1121 Prior Consultant Open 74,117.42 0.00 Under Review 2017-02-23 2019-06-12 2017-04-13 2017-01-05 2017-05-04 2017-06-08 2019-06-30 5.4 Selection DO-MMARN-55997-CS-INDV Individual / Diseño conceptual de la Pending TF / A1121 Post Consultant Open 11,999.54 0.00 2018-03-27 2018-05-15 2018-06-05 2018-07-10 2019-01-06 Plataforma Web para Implementation Selection monitoreo forestal. Act. 4a.8 DO-MMARN-51797-CS-INDV / Preparación del documento Individual Pending R-Package y su difusión. El TF / A1121 Post Consultant Open 29,979.45 0.00 2018-02-28 2018-04-18 2018-05-09 2018-06-13 2018-12-10 Implementation Consultor se encargará de la Selection difusión. (Act. 4a.5) DO-MMARN-76003-CS-INDV / Capacitación del personal nacional responsable del monitoreo y reporte de datos Individual concernientes a las emisiones Pending TF / A1121 Post Consultant Open 5,000.00 0.00 2018-10-01 2018-11-19 2018-12-10 2019-01-14 2019-06-30 por deforestación y Implementation Selection degradación forestal.. (cálculos establecimiento y actualización de los niveles de referencia). Act. 3.2 DO-MMARN-76044-CS-INDV / Evaluación de la Tenencia de Individual la Tierra y de Recursos para el Pending TF / A1121 Post Consultant Open 32,777.78 0.00 2018-09-17 2018-11-05 2018-11-26 2018-12-31 2019-06-30 Programa Nacional de Implementation Selection Emisiones de la República Dominicana. (Act. 2c.3) DO-MMARN-77147-CS-INDV Individual / Especialista en TF / A1121 Prior Consultant Open 66,092.45 0.00 Under Review 2017-08-30 2019-06-12 2017-10-18 2017-07-28 2017-11-08 2017-12-13 2019-06-30 Adquisiciones. Act. 1a.4 Selection Page 6 DO-MMARN-77159-CS-INDV Individual / Elaboración de material Pending TF / A1121 Post Consultant Open 94,530.00 0.00 2018-10-01 2018-11-19 2018-12-10 2019-01-14 2019-05-31 didáctico sobre Salvaguarda. Implementation Selection Act. 1.b4 DO-MMARN-51052-CS-INDV Individual / Especialista en TF / A1121 Post Consultant Open 28,800.00 26,025.67 Signed 2018-02-26 2019-06-17 2018-04-16 2018-05-25 2018-05-07 2018-05-27 2018-06-11 2018-07-02 2019-06-30 Comunicaciones. Act. 1b.3 Selection (1b.4) DO-MMARN-45340-CS-INDV Individual / Especialista Social. Act. 1c.9 TF / A1121 Post Consultant Open 59,142.00 57,497.88 Completed 2017-05-01 2017-03-08 2017-06-19 2018-05-15 2017-07-10 2018-07-02 2017-08-14 2018-07-02 2019-06-30 2020-07-15 (1b.11) Selection DO-MMARN-51372-CS-INDV / Coordinador Técnico Individual Especialista en Uso de Suelo, TF / A1121 Post Consultant Open 78,699.00 145,647.26 Signed 2018-02-26 2018-05-04 2018-04-16 2016-06-01 2018-05-07 2017-03-20 2018-06-11 2017-03-30 2019-06-30 Agricultura y Bosque. Act. Selection 2a.6 DO-MMARN-50905-CS-INDV Individual Under / Coordinación del Proyecto. TF / A1121 Prior Consultant Open 128,570.78 0.00 2016-12-19 2019-06-13 2017-02-06 2017-02-27 2017-04-03 2019-06-30 Implementation Act. 5.2 Selection DO-MMARN-51799-CS-INDV Individual / Asistente Administrativo. TF / A1121 Post Consultant Open 12,480.00 10,410.27 Signed 2018-02-28 2018-07-18 2018-04-18 2018-06-01 2018-05-09 2018-06-01 2018-06-13 2018-06-01 2019-06-30 5.26 Selection DO-MMARN-51800-CS-INDV Individual / Coordinador Inter- TF / A1121 Post Consultant Open 25,000.00 57,473.35 Signed 2018-02-28 2019-06-17 2018-04-18 2018-08-27 2018-05-09 2018-09-03 2018-06-13 2018-09-03 2019-06-30 Institucional Alto Nivel. Act. Selection 5.27 DO-MMARN-79611-CS-INDV Individual / Definición de Bosque según Pending TF / A1121 Post Consultant Open 5,000.00 0.00 2018-11-05 2018-12-24 2019-01-14 2019-02-18 2019-08-30 sus funciones (cumplimiento Implementation Selection al Art. 155 Ley 64-00) DO-MMARN-79613-CS-INDV / Técnico apoyo a DIARENA en Individual Pending la instalación del Sistema de TF / A1121 Post Consultant Open 4,608.00 0.00 2018-11-12 2018-12-31 2019-01-21 2019-06-30 2019-12-27 Implementation Monitoreo para REDD+ y Selection Forestal. DO-MMARN-79615-CS-INDV / Técnico apoyo a DIARENA en Individual Under la instalación del Sistema de TF / A1121 Post Consultant Open 4,608.00 0.00 2018-11-12 2018-12-06 2018-12-31 2019-01-21 2019-02-25 2019-06-30 Implementation Monitoreo para REDD+ y Selection Forestal DO-MMARN-79617-CS-INDV Individual / Técnico para apoyo del MRV TF / A1121 Post Consultant Open 5,100.00 0.00 Under Review 2018-11-30 2019-01-18 2019-02-08 2019-03-15 2019-06-30 en el sector AFOLU y Selection Agricultura DO-MMARN-79737-CS-INDV / Técnico de apoyo en Individual Under planificación y seguimiento a TF / A1121 Post Consultant Open 5,400.00 0.00 2018-11-12 2018-12-31 2019-01-21 2019-02-25 2019-06-30 Implementation la Dirección de Cambio Selection Climático DO-MMARN-83531-CS-INDV Individual / Capacitación sobre Pending TF / A1121 Post Consultant Open 13,000.00 0.00 2019-01-02 2019-02-20 2019-02-20 2019-02-20 2019-02-28 ganadería compatible con Implementation Selection cambio climático. Act. 1a.8 DO-MMARN-51384-CS-INDV Individual / Elaboración documento Pending TF / A1121 Post Consultant Open 34,246.58 0.00 2018-03-01 2018-04-19 2018-05-10 2018-06-14 2018-12-11 Estrategia Nacional REDD+. Implementation Selection 2a.9 DO-MMARN-45091-CS-INDV / Análisis marco legal, institucional y de Pending TF / A1121 Post Direct Selection Direct 38,013.70 0.00 2018-11-22 2018-11-22 2018-12-12 2019-02-25 cumplimiento para las Implementation salvaguardas de REDD. Act. 2d.1 DO-MMARN-45355-CS-INDV Individual Pending / Técnico de apoyo en TF / A1121 Post Consultant Open 5,400.00 0.00 2018-11-01 2018-12-20 2019-01-10 2019-02-14 2019-06-30 Implementation mitigación Selection DO-MMARN-66228-CS-INDV / Caracterización y Plan de Manejo Ambiental y Social en Individual Pending las Áreas Geográficas TF / A1121 Post Consultant Open 32,039.00 0.00 2018-06-11 2018-07-30 2018-08-20 2018-09-24 2019-03-23 Implementation Priorizadas de Intervención Selection REDD+ en República Dominicana. 1c.2 )1b.5). DO-MMARN-66049-CS-CDS / Elaborar un análisis multi- temporal de cambio de uso Pending TF / A1121 Post Direct Selection Direct 6,000.00 0.00 2018-06-08 2018-06-18 2018-08-22 2018-09-21 del suelo años 2005-2010- Implementation 2015 en República Dominicana (act. 2a.7) DO-MMARN-45417-CS-CDS / Elaboración de mapas de uso y cobertura del suelo Pending TF / A1121 Post Direct Selection Direct 35,000.00 0.00 2017-07-01 2017-07-11 2017-09-14 2018-03-13 2015, análisis de cambio y Implementation deforestación en la República Dominicana. Act. 2a.7. DO-MMARN-115453-CS- CDS / Curso en en Manejo de Pending TF / A1121 Post Direct Selection Direct 25,040.00 0.00 2019-05-17 2019-05-27 2019-07-31 2020-01-27 Bosques y Restauración de Implementation Paisajes Forestales. Act. 1a.5 Page 7 DO-MMARN-120511-CS- Individual INDV / Técnico de apoyo en Under TF / A1121 Post Consultant Open 27,252.00 0.00 2019-06-24 2019-08-12 2019-09-02 2019-10-07 2020-04-04 las Relaciones Implementation Selection Interinstitucioales Individual DO-MMARN-125432-CS- TF / A1121 Post Consultant Open 28,235.00 0.00 Canceled 2019-07-29 2019-09-16 2019-10-07 2019-11-11 2020-05-09 INDV / Técnico Social 2 Selection Individual DO-MMARN-79736-CS-INDV TF / A1121 Post Consultant Open 21,600.00 25,771.20 Completed 2019-08-01 2017-09-20 2019-09-19 2017-08-10 2019-10-10 2017-12-11 2019-11-14 2017-12-12 2020-05-12 2019-06-30 / Técnico Social 1 Selection DO-MMARN-135407-CS- Individual INDV / Encargado de TF / A1121 Post Consultant Open 30,900.00 24,941.26 Signed 2019-09-23 2019-10-02 2019-11-11 2019-11-01 2019-12-02 2019-11-01 2020-01-06 2019-11-01 2020-07-04 Fortalecimiento de Selection Capacidades Locales. Act. 5. DO-MMARN-159237-CS- INDV / Manual de reforestación en el marco de Individual Pending REDD+ (incluyendo sección de TF / A1121 Post Consultant Open 2,000.00 0.00 2020-02-14 2020-04-03 2020-04-24 2020-05-29 2020-11-25 Implementation salvaguardas). Act. 1c3.2c Selection Subcomponente 1c, Procesos de Consulta y Participación DO-MMARN-159248-CS- INDV / Manual de sistemas silvopastoriles en el marco de Individual Under REDD+ (incluyendo sección de TF / A1121 Post Consultant Open 2,000.00 0.00 2020-02-14 2020-03-23 2020-04-03 2020-04-24 2020-05-29 2020-10-30 Implementation Salvaguardas). Act. 1c3.2.f Selection Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159264-CS- INDV / Manual para el establecimiento y manejo de Individual viveros forestales (incluyendo Pending TF / A1121 Post Consultant Open 2,000.00 0.00 2020-05-03 2020-06-21 2020-07-12 2020-08-16 2020-10-30 sección de Salvaguardas). Act. Implementation Selection 1c3.2.a Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159272-CS- INDV / Manual de manejo forestal sostenible en el Individual marco de REDD+ (incluyendo Under TF / A1121 Post Consultant Open 2,000.00 0.00 2020-03-22 2020-03-23 2020-05-10 2020-06-29 2020-05-31 2020-11-06 2020-07-05 2020-10-03 sección de Salvaguardas). Act. Implementation Selection 1c3.2.b Subcomponente 1b. Procesos de Consulta Participación DO-MMARN-159281-CS- INDV / Manual de sistema cacao bajo sombra en el Individual marco de REDD+ (incluyendo Pending TF / A1121 Post Consultant Open 2,000.00 0.00 2020-04-12 2020-05-31 2020-06-21 2020-07-26 2020-10-24 sección de Salvaguardas). Act. Implementation Selection 1c3.2.d Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159289-CS- INDV / Manual de regeneración natural Individual degradadas en el marco de Pending TF / A1121 Post Consultant Open 2,000.00 0.00 2020-03-31 2020-05-19 2020-06-09 2020-06-28 2020-08-27 REDD+ (incluyendo sección de Implementation Selection Salvaguardas). Act. 1c3.2.g Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159295-CS- INDV / Manual de plantaciones Individual dendroenergéticas en el Pending TF / A1121 Post Consultant Open 2,000.00 0.00 2020-03-22 2020-04-20 2020-05-11 2020-06-15 2020-08-14 marco de REDD+ (incluyendo Implementation Selection sección de Salvaguardas). Act. 1c3.2.h Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159299-CS- INDV / Manual de conservación de bosques en Individual áreas protegidas en el marco Pending TF / A1121 Post Consultant Open 2,000.00 0.00 2020-04-01 2020-04-30 2020-05-21 2020-06-25 2020-08-24 de REDD+ (incluyendo sección Implementation Selection de Salvaguardas). Act. 1c3.2.i Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159305-CS- INDV / Guía para el uso adecuado de plaguicidas y la Individual Pending correcta disposición de TF / A1121 Post Consultant Open 2,000.00 0.00 2020-04-26 2020-05-25 2020-05-30 2020-06-25 2020-08-24 Implementation envases. Act. 1c3.2.k Selection Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-159245-CS- INDV / Manual de sistema café bajo sombra en el marco Individual Under de REDD+ (incluyendo sección TF / A1121 Post Consultant Open 2,000.00 0.00 2020-03-13 2020-03-23 2020-05-01 2020-05-22 2020-09-27 2021-02-28 Implementation de Salvaguardas). Act. 1c3.2.e Selection Subcomponente 1c. Procesos de Consulta Participación DO-MMARN-182519-CS- Individual Under INDV / Análisis de impacto de TF / A1121 Post Consultant Open 33,446.71 0.00 2020-06-29 2019-10-01 2020-08-17 2019-11-26 2020-09-07 2020-11-26 2020-10-12 2021-04-10 Implementation empleos verdes. 2a.11 Selection DO-MMARN-207348-CS- Individual Under INDV / Especialista Financiero TF / A1121 Post Consultant Open 80,160.00 0.00 2020-11-30 2020-12-01 2021-01-18 2020-12-09 2021-02-08 2020-12-15 2021-03-15 2021-09-11 Implementation del Proyecto Act. 5.2 Selection DO-MMARN-207349-CS- Individual Under INDV / Especialista en TF / A1121 Post Consultant Open 66,092.00 0.00 2020-11-30 2020-12-08 2021-01-18 2020-12-09 2021-02-08 2020-12-09 2021-03-15 2021-09-11 Implementation Adquisiciones. Act. 5.3 Selection Page 8 DO-MMARN-208187-CS- Individual INDV / Especialista Social. Act. TF / A1121 Post Consultant Open 51,788.00 0.00 Canceled 2020-12-07 2020-12-08 2021-01-25 2021-02-15 2021-03-22 2021-09-18 Act. 5.5 (1b.11) Selection DO-MMARN-212001-CS- Pending CDS / Especialista Social. Act. TF / A1121 Post Direct Selection Direct 34,902.00 0.00 2020-12-30 2020-12-30 2021-01-21 2021-12-15 Implementation 5.5 (1b.11) DO-MMARN-216399-CS- INDV / Técnico en Comunicaciones (Diseño de Individual Under materiales, mantenimiento TF / A1121 Post Consultant Open 13,332.00 0.00 2021-01-27 2021-02-02 2021-03-17 2021-04-07 2021-05-12 2021-11-08 Implementation página web REDD+, apoyo Selection con estrategias de comunicacion). Act. 1b.2 DO-MMARN-218947-CS- INDV / Especialista en Individual Under Planificación Estratégica para TF / A1121 Post Consultant Open 21,810.00 0.00 2021-02-11 2021-02-16 2021-04-01 2021-04-22 2021-05-27 2021-11-23 Implementation Cooperación Internacional . Selection Act. 5.23 DO-MMARN-222389-CS- Individual INDV / Técnico/a Under TF / A1121 Post Consultant Open 13,332.00 0.00 2021-03-03 2021-03-04 2021-04-21 2021-05-12 2021-06-16 2021-12-13 Capacitación y Divulgación. Implementation Selection Act. 5.23 DO-MMARN-230052-CS- CDS / Elaboración de Guías Técnicas y Capacitación sobre Pending TF / A1121 Post Direct Selection Direct 255,000.00 0.00 2021-04-19 2021-04-29 2021-07-03 2021-12-30 REDD+ en República Implementation Dominicana. Act. 2c.3.2; 2c.8; 4a.5 (antes 3.7) Page 9