PROCUREMENT PLAN (Textual Part) Project information: [Pakistan] Balochistan Human Capital Investment Project (BHCIP) P166308 Project Implementation agency: (i) Secondary Education Department (SED) and; (ii) Health Department Date of the Procurement Plan: May 2021 Period covered by this Procurement Plan: May 2021 November 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Khyber Pakhtunkhwa Public Procurement Rules ( as amended from time to time), such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: 1) The eligibility of bidders shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. 2) For national open competitive procurement, only the model procurement documents acceptable to the World Bank, shall be used. 3) The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 4) Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts 5) Access to procurement opportunities shall not be restricted to firms that have pre-registered and/or paid a registration fee. 6) No preference of any kind shall be given to national bidders in the bidding process. 7) When using any method other than single-stage single envelope on compliance-based evaluation criteria, Bank’s prior concurrence shall be mandatory When other national procurement arrangements (other than national open competitive procurement) are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework1 Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines2 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; 1[Drafting note: This document shall be signed by bidders/proposers/consultants and submitted as part of their bids/proposals. In addition, this document shall be signed by the winning bidder/consultant and incorporated as part of the contract.] 2Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;3 (ii) to be a nominated4 sub-contractor, sub-consultant, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank- financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect5 all accounts, records, and other documents relating to 3 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification or initial selection), expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 4A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the bidding document) is one which has been: (i) included by the bidder in its pre-qualification or initial selection application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 5Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact- finding activities undertaken by the Bank or persons appointed by the Bank to address specific the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Proposer/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Proposer/ Consultant: Title of the person signing the Letter: matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Pakistan : Balochistan Human Capital Investment Project PLAN General Information Country: Pakistan Bank’s Approval Date of the Original Procurement Plan: 2021-08-05 2021-09-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166308 GPN Date: Project Name: Balochistan Human Capital Investment Project Loan / Credit No: IDA / 67130 Secondary Education Department Government of Balochistan Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-SED - GOB-246236-CW- Request for RFB / Works Package 01, Bids - Small Pending 2. Improving utilization of Single Stage - One 2023-09- Construction and IDA / 67130 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-12-27 2022-01-01 2022-01-31 2022-02-20 2022-03-21 quality education services Envelope 17 Rehabilitation of Schools at envelope ion District Quetta process) PK-SED - GOB-246242-CW- Request for RFB / Works Package 02, Bids - Small Pending 2. Improving utilization of Single Stage - One 2023-09- Construction and IDA / 67130 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-12-27 2022-01-01 2022-01-31 2022-02-20 2022-03-21 quality education services Envelope 17 Rehabilitation of Schools at envelope ion District Quetta process) PK-SED - GOB-246246-CW- Request for RFB / Works Package 03, Bids - Small Pending 2. Improving utilization of Single Stage - One 2023-09- Construction and IDA / 67130 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-12-27 2022-01-01 2022-01-31 2022-02-20 2022-03-21 quality education services Envelope 17 Rehabilitation of Schools at envelope ion District Quetta process) PK-SED - GOB-246247-CW- Request for RFB / Works Package 04, Bids - Small Pending 2. Improving utilization of Single Stage - One 2023-09- Construction and IDA / 67130 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-12-27 2022-01-01 2022-01-31 2022-02-20 2022-03-21 quality education services Envelope 17 Rehabilitation of Schools at envelope ion District Pishin process) PK-SED - GOB-246248-CW- Request for RFB / Works Package 05, Bids - Small Pending 2. Improving utilization of Single Stage - One 2023-09- Construction and IDA / 67130 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-12-27 2022-01-01 2022-01-31 2022-02-20 2022-03-21 quality education services Envelope 17 Rehabilitation of Schools at envelope ion District Pishin process) PK-SED - GOB-246250-CW- Request for RFB / Works Package 06, Bids - Small Pending 2. Improving utilization of Single Stage - One 2023-09- Construction and IDA / 67130 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-12-27 2022-01-01 2022-01-31 2022-02-20 2022-03-21 quality education services Envelope 17 Rehabilitation of Schools at envelope ion District Killa Abdullah process) PK-SED - GOB-246251-CW- Request for RFB / Works Package 07, Bids - Small Pending 2. Improving utilization of Single Stage - One 2023-09- Construction and IDA / 67130 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-12-27 2022-01-01 2022-01-31 2022-02-20 2022-03-21 quality education services Envelope 17 Rehabilitation of Schools at envelope ion District Killa Abdullah process) PK-SED - GOB-246252-CW- Request for RFB / Works Package 08, Bids - Small Pending 2. Improving utilization of Single Stage - One 2023-09- Construction and IDA / 67130 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-12-27 2022-01-01 2022-01-31 2022-02-20 2022-03-21 quality education services Envelope 17 Rehabilitation of Schools at envelope ion District Killa Abdullah process) PK-SED - GOB-246253-CW- Request for RFB / Works Package 09, Bids - Small Pending 2. Improving utilization of Single Stage - One 2023-09- Construction and IDA / 67130 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-12-27 2022-01-01 2022-01-31 2022-02-20 2022-03-21 quality education services Envelope 17 Rehabilitation of Schools at envelope ion District Chagai process) PK-SED - GOB-246257-CW- Request for RFB / Works Package 10, Bids - Small Pending 2. Improving utilization of Single Stage - One 2023-09- Construction and IDA / 67130 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-12-27 2022-01-01 2022-01-31 2022-02-20 2022-03-21 quality education services Envelope 17 Rehabilitation of Schools at envelope ion District Chagai process) PK-SED - GOB-246259-CW- Request for RFB / Works Package 11, Bids - Small Pending 2. Improving utilization of Single Stage - One 2023-09- Construction and IDA / 67130 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2021-12-27 2022-01-01 2022-01-31 2022-02-20 2022-03-21 quality education services Envelope 17 Rehabilitation of Schools at envelope ion District Chagai process) PK-SED - GOB-246260-CW- Request for RFB / Works Package 12, Bids - Small Pending 2. Improving utilization of Single Stage - One 2024-03- Construction and IDA / 67130 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2022-07-04 2022-07-09 2022-08-08 2022-08-28 2022-09-26 quality education services Envelope 24 Rehabilitation of Schools at envelope ion District Quetta process) PK-SED - GOB-246261-CW- Request for RFB / Works Package 13, Bids - Small Pending 2. Improving utilization of Single Stage - One 2024-03- Construction and IDA / 67130 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2022-07-04 2022-07-09 2022-08-08 2022-08-28 2022-09-26 quality education services Envelope 24 Rehabilitation of Schools at envelope ion District Quetta process) PK-SED - GOB-246262-CW- Request for RFB / Works Package 14, Bids - Small Pending 2. Improving utilization of Single Stage - One 2024-03- Construction and IDA / 67130 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2022-06-20 2022-06-25 2022-07-25 2022-08-14 2022-09-12 quality education services Envelope 10 Rehabilitation of Schools at envelope ion District Pishin process) PK-SED - GOB-246263-CW- Request for RFB / Works Package 15, Bids - Small Pending 2. Improving utilization of Single Stage - One 2024-03- Construction and IDA / 67130 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2022-06-20 2022-06-25 2022-07-25 2022-08-14 2022-09-12 quality education services Envelope 10 Rehabilitation of Schools at envelope ion District Killa Abdullah process) Page 1 PK-SED - GOB-246264-CW- Request for RFB / Works Package 16, Bids - Small Pending 2. Improving utilization of Single Stage - One 2024-03- Construction and IDA / 67130 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2022-06-20 2022-06-25 2022-07-25 2022-08-14 2022-09-12 quality education services Envelope 10 Rehabilitation of Schools at envelope ion District Killa Abdullah process) PK-SED - GOB-246265-CW- Request for RFB / Works Package 17, Bids - Small Pending 2. Improving utilization of Single Stage - One 2024-03- Construction and IDA / 67130 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2022-06-20 2022-06-25 2022-07-25 2022-08-14 2022-09-12 quality education services Envelope 10 Rehabilitation of Schools at envelope ion District Killa Abdullah process) PK-SED - GOB-246266-CW- Request for RFB / Works Package 18, Bids - Small Pending 2. Improving utilization of Single Stage - One 2024-03- Construction and IDA / 67130 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2022-06-20 2022-06-25 2022-07-25 2022-08-14 2022-09-12 quality education services Envelope 10 Rehabilitation of Schools at envelope ion District Chagai process) PK-SED - GOB-246267-CW- Request for RFB / Works Package 19, Bids - Small Pending 2. Improving utilization of Single Stage - One 2024-03- Construction and IDA / 67130 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2022-06-20 2022-06-25 2022-07-25 2022-08-14 2022-09-12 quality education services Envelope 10 Rehabilitation of Schools at envelope ion District Chagai process) PK-SED - GOB-246268-CW- Request for RFB / Works Package 20, Bids - Small Pending 2. Improving utilization of Single Stage - One 2024-03- Construction and IDA / 67130 Post Request for Bids Open - National Works SPD (1 0.00 Implementat 2022-06-20 2022-06-25 2022-07-25 2022-08-14 2022-09-12 quality education services Envelope 10 Rehabilitation of Schools at envelope ion District Chagai process) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-SED - GOB-246322-GO- Pending 2. Improving utilization of Request for Single Stage - One RFQ / Procurement of School IDA / 67130 Post Open - National 0.00 Implementati 2021-12-18 2022-01-15 2022-07-14 quality education services Quotations Envelope and Classroom Articles on PK-SED - GOB-246284-GO- Pending 2. Improving utilization of Single Stage - One RFB / Procurement of Sports IDA / 67130 Post Request for Bids Open - National 0.00 Implementati 2021-11-22 2021-11-27 2021-12-27 2022-01-11 2022-02-09 2023-02-09 quality education services Envelope Goods for 294 Schools on PK-SED - GOB-246295-GO- Pending RFB / Procurement of Science 2. Improving utilization of Single Stage - One IDA / 67130 Post Request for Bids Open - National 0.00 Implementati 2022-01-03 2022-01-08 2022-02-07 2022-02-22 2022-03-23 2023-03-23 Lab Equipments for 48 quality education services Envelope on Schools PK-SED - GOB-246271-GO- Pending 2. Improving utilization of Single Stage - One RFB / Procurement of IDA / 67130 Post Request for Bids Open - National 0.00 Implementati 2021-11-08 2021-11-13 2021-12-13 2021-12-28 2022-01-26 2023-07-25 quality education services Envelope Furniture for Schools on PK-SED - GOB-246327-GO- Pending RFB / Procurement of 2. Improving utilization of Single Stage - One IDA / 67130 Post Request for Bids Open - National 0.00 Implementati 2021-12-15 2021-12-20 2022-01-19 2022-02-03 2022-03-04 2022-10-30 Equipments for Resource quality education services Envelope on Centre PK-SED - GOB-246278-GO- Pending RFB / Procurement of ECE 2. Improving utilization of Single Stage - One IDA / 67130 Post Request for Bids Open - National 0.00 Implementati 2021-12-20 2021-12-25 2022-01-24 2022-02-08 2022-03-09 2023-03-09 Supplies and TLM for 544 quality education services Envelope on Schools PK-SED - GOB-246301-GO- Pending 2. Improving utilization of Single Stage - One RFB / Procurement of Solar IDA / 67130 Post Request for Bids Open - National 0.00 Implementati 2021-12-27 2022-01-01 2022-01-31 2022-02-20 2022-03-12 2023-03-12 quality education services Envelope Equipment for Schools on PK-SED - GOB-246290-GO- Pending 2. Improving utilization of Single Stage - One RFB / Procurement of IT Lab IDA / 67130 Post Request for Bids Open - National 0.00 Implementati 2021-12-15 2021-12-20 2022-01-19 2022-02-03 2022-03-04 2022-08-31 quality education services Envelope Equipments for 48 Schools on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-SED - GOB-252705-NC- RFB / Hiring of Social Mobilisation Implementing Pending 2. Improving utilization of Single Stage - One Partner, One for District Pishin IDA / 67130 Post Request for Bids Open - National 0.00 Implementati 2021-09-29 2021-10-04 2021-11-01 2021-11-21 2021-12-13 2024-05-31 quality education services Envelope and Killa Abdullah and One on for Quetta and Chaghi under two lots CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-SED - GOB-254745-CS- LCS / Hiring of Engineering, Design, Supervision and Quality Assurance Firm for 1. Improving utilization of Least Cost Pending IDA / 67130 Post Open - National 0.00 2021-09-30 2021-10-21 2021-11-20 2021-12-18 2022-01-07 2022-01-21 2022-02-16 2024-04-16 Rehabilitation and quality health services Selection Implementation Construction Works under BHCIP Education and Health Component INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 PK-SED - GOB-254776-CS- INDV / Transition of Procurement Specialist (Mr. Individual 2. Improving utilization of Pending Shakeel Azam) from BESP to IDA / 67130 Post Consultant Direct 0.00 2021-09-24 2021-09-27 2021-09-28 2021-09-30 2025-06-30 quality education services Implementation BHCIP as proposed and Selection agreed with the Bank. Justification will also be provided on STEP PK-SED - GOB-254822-CS- INDV / Transition of Manager Monitoring & Evaluation (Mr. Individual 2. Improving utilization of Pending Naseeb Ullah) from BESP to IDA / 67130 Post Consultant Direct 0.00 2021-09-27 2021-09-30 2021-10-01 2021-10-03 2025-06-30 quality education services Implementation BHCIP as proposed and Selection agreed with the Bank. Justification will also be provided on STEP PK-SED - GOB-254826-CS- INDV / Transition of Manager Development & Infra Structure Individual (Mr. Fareed Ullah Khan) from 2. Improving utilization of Pending IDA / 67130 Post Consultant Direct 0.00 2021-09-27 2021-09-30 2021-10-01 2021-10-03 2025-06-30 BESP to BHCIP as proposed quality education services Implementation Selection and agreed with the Bank. Justification will also be provided on STEP PK-SED - GOB-254828-CS- INDV / Transition of Manager Education (Mr. Zulfiqar Ali) Individual 2. Improving utilization of Pending from BESP to BHCIP as IDA / 67130 Post Consultant Direct 0.00 2021-09-27 2021-09-30 2021-10-01 2021-10-03 2025-06-30 quality education services Implementation proposed and agreed with the Selection Bank. Justification will also be provided on STEP PK-SED - GOB-254829-CS- INDV / Transition of Manager Financial Management (Mr. Individual Muhammad Iftikhar Saeed) 2. Improving utilization of Pending IDA / 67130 Post Consultant Direct 0.00 2021-09-27 2021-09-30 2021-10-01 2021-10-03 2025-06-30 from BESP to BHCIP as quality education services Implementation Selection proposed and agreed with the Bank. Justification will also be provided on STEP PK-SED - GOB-254836-CS- INDV / Transition of Senior Admin & Logistic Officer (Mr. Individual 2. Improving utilization of Pending Adnan Khan) from BESP to IDA / 67130 Post Consultant Direct 0.00 2021-09-27 2021-09-30 2021-10-01 2021-10-03 2022-10-03 quality education services Implementation BHCIP as proposed and Selection agreed with the Bank. Justification will also be provided on STEP PK-SED - GOB-254838-CS- INDV / Transition of Senior HR Officer (Miss. Nazia Bano) Individual 2. Improving utilization of Pending from BESP to BHCIP as IDA / 67130 Post Consultant Direct 0.00 2021-09-27 2021-09-30 2021-10-01 2021-10-03 2022-10-03 quality education services Implementation proposed and agreed with the Selection Bank. Justification will also be provided on STEP Page 3