Appendix to Annex 3 Procurement Plan I. General 1. Project Information Country : India Borrower : Government of India Project Name : National Hydrology Project Loan Credit No. : 2. Bank’s Approval Date of the Procurement Plan : 3. Date of General Procurement Notice : 4. Period Covered by this procurement plan : 18 months II. Goods, Works, and Non-Consulting Services Thresholds for Method of Procurement for procurement of goods, works and non-consulting services Procurement of Goods, Information technology and non consultancy services: Method of Procurement Thresholds for Methods International Competitive Bidding (ICB) > US Dollars 3 million Limited Competitive Bidding (LIB) Must meet the requirements as per Para 3.2 of the Procurement Guidelines, and with prior agreement in PP with the Bank National Competitive Bidding (NCB) > USD 100,000 and up to USD 3 million Shopping Up to USD 100,000 (INR 6.5 m) Direct Must meet the requirements as per Para 3.7 of the Procurement Guidelines, and with prior agreement in PP with the Bank Framework Agreement Must meet the requirements as per Para 3.6 of the Procurement Guidelines, and with prior agreement in PP with the Bank Procurement of Works: Method of Procurement Thresholds for Methods International Competitive Bidding (ICB) > US Dollars 40 million National Competitive Bidding (NCB) > USD 100,000 and up to USD 40 million Comparison of three quotations / Shopping Up to USD 100,000 (INR 6.5 m) Force Account Must meet the requirements as per Para 3.9 of the Procurement Guidelines, and with prior agreement in PP with the Bank Prior Review Thresholds: The following would be subject to Prior review of the Bank regardless of the Method of selection: (a) Works: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 10 million (b) Goods: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 2 million; and The Prior Review Thresholds will be reviewed and updated during the implementation of the project, and modified based on the risk assessment. 1. In the case of contracts subject to prior review, Project Implementing Entity shall seek the Bank’s no objection before granting/agreeing to (a) an extension of the stipulated time for performance of a contract that either increases the contract price or has an impact on the planned completion of the project; (b) any substantial modification of the scope of works, goods, non-consulting services or consulting services, other significant changes to the terms and conditions of such that the contract,; (c) any variation order or amendment (except in cases of extreme urgency) which singly or combined with all variation orders or amendments previously issued, increase the original contract amount by more than 15 percent; or (d) the proposed termination of the contract.. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Prequalification Not Applicable Domestic Preference: The provision of domestic preference is applicable in the evaluation of Goods only. 3. Reference to Procurement Manual The procurement manual for the project is presently under preparation. SBDs agreed between the Project and Bank will be used for all works, goods, and non consultancy procurements. 4. Any Other Special Procurement Arrangements The National bidding method for procurement and goods and works according to the above value thresholds will be conducted in accordance with paragraphs 3.3 and 3.4 of the Bank’s Procurement Guidelines and the following provisions: (a) Only the model bidding documents for NCB agreed with the GOI task force (and as amended for time to time) shall be used for bidding. (b) Invitations to bid shall be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access along with an abridged version of the said advertisement published in a widely circulated national daily, among others, giving the website/electronic portal details from which the details of the invitation to bid can be downloaded) at least 30 days before the deadline for the submission of bids. (c) No special preferences will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state-owned enterprises, small-scale enterprises, or enterprises from any given state. (d) Extension of bid validity shall not be allowed with reference to contracts subject to Bank prior review without the prior concurrence of the Bank (i) for the first request for extension if it is longer than four weeks and (ii) for all subsequent requests for extension irrespective of the period (such concurrence will be considered by the Bank only in cases of force majeure and circumstances beyond the control of the purchaser/employer). (e) Rebidding shall not be carried out with reference to contracts subject to Bank prior review without the prior concurrence of the Bank. The system of rejecting bids outside a predetermined margin or ‘bracket’ of prices shall not be used in the project. (f) Rate contracts entered into by the DGS&D will not be acceptable as a substitute for NCB procedures unless incorporation of right to audit and fraud corruption clauses. DGS&D contracts will be acceptable, however, for any procurement under the shopping procedures. (g) Two or three envelope system will not be used (except when using the e-procurement system assessed and agreed by the Bank). (h) No negotiations are conducted even with the lowest evaluated responsive bidders. 5. The bid evaluation will be carried out according to the agreed timeline in the Procurement Activity Schedule. III. Selection of Consultants 1. Methods and Prior Review Threshold Procurement methods of procurement of Consultants' Services (Firms) Method of Procurement Thresholds for Methods Quality and Cost Based Selection (QCBS) Quality Based Selection (QBS) Must meet the requirements as per Para 3..2 to 3.4 of the Consultant Guidelines Selection based on a Fixed Budget (FBS) Must meet the requirements as per Para 3.5 of the Consultant Guidelines, Selection Based on Least Cost Basis (LCS) Must meet the requirements as per Para 3.6 of the Consultant Guidelines, Selection based on Consultant’s Qualification Estimated not to exceed USD 300,000, and (CQ) must meet the requirements as per Para 3.7 of the Consultant Guidelines. Single Source Selection (SSS) Must meet the requirements as per Para 3.8 to 3.11 of the Consultant Guidelines, and with prior agreement in PP with the Bank. Procurement methods for Selection of Individual Consultants (IC) Method of Procurement Thresholds for Methods Competitive Selection Must meet the requirements of Section V, Para 5.1 to 5.5 of the Consultant Guidelines. Single Source Selection (SSS) Must meet the requirements of Section V, Para 5.6 of the Consultant Guidelines and with prior agreement in PP with the Bank *Shall meet the requirements as stated in Consultant Guidelines Prior Review Thresholds: (a). Consulting Firm: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 1 million. (b). Individual Consultant: all procurements estimated to cost more than USD 0.3 million Terms of Reference (ToR) for all consultant contracts shall be furnished to the Bank for its prior review and No Objection. Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified. 1. In the case of contracts subject to prior review, before agreeing to: (a) an extension of the stipulated time for performance of a contract; (b) any substantial modification of the scope of services, substitutions of key experts, or other significant changes to the terms and conditions of the contract; or (c) the proposed termination of the contract, the Borrower shall seek the Bank’s no objection. A copy of all amendments to the contract shall be furnished to the Bank for its record. 2. Short List comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than USD 800,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. The Request for Expression of Interest for consultancy services estimated to cost above USD 300,000 equivalent per contract for firms shall be advertised in UNDB online and World Bank external Website and in accordance with other provisions of Para 2.5 of the Consultant Guidelines 4. Any other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable] I. Implementing Agency Capacity Building Activities with Time Schedule No Expected Outcome/Activity Description Estimated Date Duration ASCI training on Procurement Procedures arranged for 1. Executive, Assistant Engineers who are responsible for 2 weeks Continuous Procurement – multiple trainings 2. Contract management training – multiple trainings 2 weeks Continuous Customized training on Procurement Procedures arranged for 3. Executive, Assistant Engineers who are responsible for 1 week Continuous Procurement – multiple trainings PROCUREMENT India : National Hydrology Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2017-10-04 2020-07-08 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P152698 GPN Date: Project Name: National Hydrology Project Loan / Credit No: IBRD / 87250 Executing Agency(ies): Tamil Nadu - NHP WORKS Bid Evaluation Activity Reference No. / Procurement Estimated Actual Draft Bidding Loan / Credit Market Procurement Prequalification High SEA/SH Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Contract Description Component Review Type Method Document Amount Amount Document / Signed Contract No. Approach Process (Y/N) Risk Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Completion Type (US$) (US$) Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned IN-TAMIL NADU -46686- CW-RFQ / Improvements to Data Centre in Ground Water Division and Sub- Pending Institutional Capacity Request for Single Stage - One Divisional Data Centre at IBRD / 87250 Post Limited 9,231.00 0.00 Implementat 2018-02-12 2018-04-02 2018-05-31 Enhancement Quotations Envelope Salem Ground Water sub ion division, Ground water circle office & Division campus at Thanjavur District. IN-TAMIL NADU -46681- CW-RFQ / Repairs and Renovation works to Regional and Division Data Processing Centres at Pending Institutional Capacity Request for Single Stage - One Thallakulam in Madurai IBRD / 87250 Post Limited 7,692.00 0.00 Implementat 2018-02-01 2018-03-15 2018-05-14 Enhancement Quotations Envelope District & Data Processing ion Centres at Paramakudi Ground Water Subdivision office in Ramanathapuram District. . IN-TAMIL NADU -46688- CW-RFQ / Improvements to Pending Data Processing Centre at Institutional Capacity Request for Single Stage - One IBRD / 87250 Post Limited 7,692.00 0.00 Implementat 2018-01-31 2018-03-15 2018-06-18 Ground Water Divisions at Enhancement Quotations Envelope ion Tharamani, Cuddalore and Vellore. IN-TAMIL NADU -46834- CW-RFQ / Improvements to Pending TAWS station at Upper Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 954.00 0.00 Implementat 2018-02-12 2018-04-02 2018-05-31 Anicut in Trichy, Ooty and System Quotations Envelope ion Valparai in Coimbatore District. IN-TAMIL NADU -46732- CW-RFQ / Improvements to the Standard Rainguage Pending Water Resources Monitoring Request for Single Stage - One Stations at Sivagangai taluk IBRD / 87250 Post Limited 154.00 0.00 Implementat 2018-01-31 2018-03-15 2018-05-14 System Quotations Envelope Office in Sivagangai and at ion Karaikudi taluk Office in Sivagangai District. IN-TAMIL NADU -46744- CW-RFQ / Improvements to the Standard Rainguage Pending Stations at Poonimangadu Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 385.00 0.00 Implementat 2018-01-30 2018-03-13 2018-05-14 and Dharanivaraghapuram in System Quotations Envelope ion Thiruvallur, Palur and Thirukoilur in Cuddalore and Villupuram Page 1 Pending NHP-2018-2019-TN-477234 / Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 7,692.31 0.00 Implementat 2018-12-10 2019-02-04 2019-08-03 Improvements to SDPC System Quotations Envelope ion NHP-2018-2019-TN-185376 / Renovation of Divisional Pending Data Processing Centre at Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 12,307.69 0.00 Implementat 2018-12-09 2019-02-03 2019-08-02 Cuddalore and Sub System Quotations Envelope ion Divisional Data Processing Centres NHP-2018-2019-TN-806612 / Renovation of Divisional Pending Water Resources Monitoring Request for Single Stage - One Data Processing Centre at IBRD / 87250 Post Limited 12,307.69 0.00 Implementat 2018-12-09 2019-02-03 2019-08-02 System Quotations Envelope Vellore and Sub Divisional ion Data Processing Centres NHP-2018-2019-TN-128139 / Renovation of Divisional Pending Water Resources Monitoring Request for Single Stage - One Data Processing Centre at IBRD / 87250 Post Limited 4,615.38 0.00 Implementat 2018-12-09 2019-02-03 2019-08-02 System Quotations Envelope Gaugings and Sub Divisional ion Data Processing Centres NHP-2018-2019-TN-747351 / Renovation of Divisional Pending Water Resources Monitoring Request for Single Stage - One Data Processing Centre at IBRD / 87250 Post Limited 12,307.69 0.00 Implementat 2018-12-09 2019-02-03 2019-08-02 System Quotations Envelope Salem and Sub Divisional ion Data Processing Centres NHP-2018-2019-TN-527865 / Renovation of Divisional Pending Water Resources Monitoring Request for Single Stage - One Data Processing Centre at IBRD / 87250 Post Limited 12,307.69 0.00 Implementat 2018-12-09 2019-02-03 2019-08-02 System Quotations Envelope Trichy and Sub Divisional ion Data Processing Centres NHP-2018-2019-TN-857149 / Renovation of Regional Data Pending Processing Centre at Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 15,384.62 0.00 Implementat 2018-12-09 2019-02-03 2019-08-02 Thanjavur and Divisional System Quotations Envelope ion Data Processing Centre at Thanjavur NHP-2018-2019-TN-758640 / Renovation of Regional Data Under Processing Centre at Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 15,384.62 0.00 Implementat 2018-12-09 2019-02-03 2019-08-02 Madurai and Divisional Data System Quotations Envelope ion Processing Centre at Madurai NHP-2018-2019-TN-175983 / Renovation of Divisional Pending Data Processing Centre at Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 12,307.69 0.00 Implementat 2018-12-09 2019-02-03 2019-08-02 Karaikudi and Sub System Quotations Envelope ion Divisional Data Processing Centres NHP-2018-2019-TN-914983 / Renovation of Divisional Pending Data Processing Centre at Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 10,769.23 0.00 Implementat 2018-12-09 2019-02-03 2019-08-02 Tirunelveli and Sub System Quotations Envelope ion Divisional Data Processing Centres NHP-2018-2019-TN-686434 / Renovation of Divisional Pending Water Resources Monitoring Request for Single Stage - One Data Processing Center at IBRD / 87250 Post Limited 12,307.69 0.00 Implementat 2018-12-09 2019-02-03 2019-08-02 System Quotations Envelope Chennai and Sub divisional ion Data processing centers Page 2 NHP-2019-2020-TN-616350 / Pending Construction of New GD Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 15,384.62 0.00 Implementat 2019-12-09 2020-02-03 2020-08-03 station at Trichy in System Quotations Envelope ion Kodumorati River NHP-2019-2020-TN-258415 / Pending Upgradation of training Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 7,692.31 0.00 Implementat 2019-11-20 2020-01-19 2020-07-17 centres including e-class System Quotations Envelope ion room NHP-2019-2020-TN-211835 / Pending Upgradation of training Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 7,692.31 0.00 Implementat 2019-11-20 2020-01-15 2020-07-14 centres including e-class System Quotations Envelope ion room NHP-2019-2020-TN-661382 / Pending Construction of new FCS Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 3,076.92 0.00 Implementat 2019-12-09 2020-02-03 2020-08-03 stations at Gummidipondi in System Quotations Envelope ion GWD, Chennai NHP-2019-2020-TN-601448 / Pending Construction of new FCS Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 3,076.92 0.00 Implementat 2019-12-09 2020-02-03 2020-08-03 stations at Aliabad Anicut in System Quotations Envelope ion GWD, Vellore NHP-2019-2020-TN-401504 / Pending Construction of new FCS Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 3,076.92 0.00 Implementat 2019-12-09 2020-02-03 2020-08-03 stations at Hogenakkal in System Quotations Envelope ion GWD, Vellore NHP-2019-2020-TN-252193 / Pending Construction of new FCS Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 3,076.92 0.00 Implementat 2019-12-09 2020-02-03 2020-08-03 stations at Gudalore in System Quotations Envelope ion GWD, Madurai NHP-2019-2020-TN-257133 / Construction of new FCS Pending Water Resources Monitoring Request for Single Stage - One stations at Madurai IBRD / 87250 Post Limited 3,076.92 0.00 Implementat 2019-12-09 2020-02-03 2020-08-03 System Quotations Envelope Thallakulam in GWD, ion Madurai NHP-2019-2020-TN-978357 / Pending Construction of new FCS Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 3,076.92 0.00 Implementat 2019-12-09 2020-02-03 2020-08-03 stations at Thondi in GWD, System Quotations Envelope ion Karaikudi NHP-2019-2020-TN-205472 / Pending Construction of new FCS Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 3,076.92 0.00 Implementat 2019-12-09 2020-02-03 2020-08-03 stations at Kadaladi in System Quotations Envelope ion GWD, Karaikudi NHP-2019-2020-TN-326734 / Pending Construction of new FCS Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 3,076.92 0.00 Implementat 2019-12-09 2020-02-03 2020-08-03 stations at Thenkasi in System Quotations Envelope ion GWD, Tirunelveli NHP-2019-2020-TN-431495 / Pending Construction of new FCS Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 3,076.92 0.00 Implementat 2019-12-09 2020-02-03 2020-08-03 stations at Kodayar Dam in System Quotations Envelope ion GWD, Tirunelveli NHP-2020-2021-TN-957143 / Pending Construction of Deep Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 61,538.46 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Piezometers, Ground Water System Quotations Envelope ion Division, Vellore Page 3 NHP-2020-2021-TN-413931 / Pending Construction of Deep Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 12,307.69 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Piezometers, Ground Water System Quotations Envelope ion Division, Madurai NHP-2020-2021-TN-895369 / Pending Construction of Deep Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 67,692.31 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Piezometers, Ground Water System Quotations Envelope ion Division, Trichy NHP-2020-2021-TN-188863 / Pending Construction of Deep Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 55,384.62 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Piezometers, Ground Water System Quotations Envelope ion Division, Salem NHP-2020-2021-TN-772208 / Pending Construction of Deep Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 67,692.31 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Piezometers, Ground Water System Quotations Envelope ion Division, Thanjavur NHP-2020-2021-TN-118750 / Pending Construction of Deep Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 55,384.62 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Piezometers, Ground Water System Quotations Envelope ion Division, Karaikudi NHP-2020-2021-TN-586320 / Pending Constructions of Deep Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 43,076.92 0.00 Implementat 2020-06-15 2020-08-10 2021-02-06 Piezometers, Ground Water System Quotations Envelope ion Division, Chennai NHP-2020-2021-TN-256532 / Pending Construction of Deep Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 24,615.38 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Piezometers, Ground Water System Quotations Envelope ion Division, Cuddalore NHP-2020-2021-TN-172689 / Pending Construction of Deep Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 67,692.31 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Piezometers, Ground Water System Quotations Envelope ion Division, Tirunelveli NHP-2020-2021-TN-477141 / Civil works for Network Pending Water Resources Information Request for Single Stage - One stations (FCS, AWS, DWLR IBRD / 87250 Post Limited 18,461.54 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Systems Quotations Envelope etc.,) in respect of Ground ion Water Division, Salem NHP-2020-2021-TN-186761 / Civil works for Network Pending Water Resources Information Request for Single Stage - One stations (FCS, AWS, DWLR IBRD / 87250 Post Limited 7,692.31 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Systems Quotations Envelope etc.,) in respect of Ground ion Water Division, Madurai NHP-2020-2021-TN-835838 / Civil works for Network Pending Water Resources Information Request for Single Stage - One stations (FCS, AWS, DWLR IBRD / 87250 Post Limited 18,461.54 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Systems Quotations Envelope etc.,) in respect of Ground ion Water Division, Trichy NHP-2020-2021-TN-774292 / Civil works for Network Pending Water Resources Information Request for Single Stage - One stations (FCS, AWS, DWLR IBRD / 87250 Post Limited 15,384.62 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Systems Quotations Envelope etc.,) in respect of Ground ion Water Division, Tirunelveli NHP-2020-2021-TN-774309 / Civil works for Network Pending Water Resources Information Request for Single Stage - One stations (FCS, AWS, DWLR IBRD / 87250 Post Limited 15,384.62 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Systems Quotations Envelope etc.,) in respect of Ground ion Water Division, Chennai Page 4 NHP-2020-2021-TN-993187 / Civil works for Network Pending Water Resources Information Request for Single Stage - One stations (FCS, AWS, DWLR IBRD / 87250 Post Limited 13,846.15 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Systems Quotations Envelope etc.,) in respect of Ground ion Water Division, Vellore NHP-2020-2021-TN-111831 / Civil works for Network Pending Water Resources Information Request for Single Stage - One stations (FCS, AWS, DWLR IBRD / 87250 Post Limited 13,846.15 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Systems Quotations Envelope etc.,) in respect of Ground ion Water Division, Cuddalore NHP-2020-2021-TN-970735 / Civil works for Network Pending Water Resources Information Request for Single Stage - One stations (FCS, AWS, DWLR IBRD / 87250 Post Limited 4,615.38 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Systems Quotations Envelope etc.,) in respect of Gauging ion Division, Chennai NHP-2020-2021-TN-843006 / Civil works for Network Pending Water Resources Information Request for Single Stage - One stations (FCS, AWS, DWLR IBRD / 87250 Post Limited 12,307.69 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Systems Quotations Envelope etc.,) in respect of Ground ion Water Division, Thanjavur NHP-2020-2021-TN-679102 / Civil works for Network Pending Water Resources Information Request for Single Stage - One stations (FCS, AWS, DWLR IBRD / 87250 Post Limited 12,307.69 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Systems Quotations Envelope etc.,) in respect of Ground ion Water Division, Karaikudi NHP-2020-2021-TN-591822 / Renovation of Sub Divisional Pending Institutional Capacity Request for Single Stage - One Data Processing Centre at IBRD / 87250 Post Limited 12,307.69 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Enhancement Quotations Envelope Coimbatore, Erode and ion Salem. NHP-2020-2021-TN-646275 / Pending Renovation of Sub Divisional Institutional Capacity Request for Single Stage - One IBRD / 87250 Post Limited 12,307.69 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Data Processing Centre at Enhancement Quotations Envelope ion Cuddalore and Villupuram. NHP-2020-2021-TN-843746 / Renovation of Sub Divisional Pending Institutional Capacity Request for Single Stage - One Data Processing Centre at IBRD / 87250 Post Limited 12,307.69 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Enhancement Quotations Envelope Thiruvanamalai, Dharmapuri ion and Vellore. NHP-2020-2021-TN-440650 / Renovation of Sub Divisional Pending Data Processing Centre at Institutional Capacity Request for Single Stage - One IBRD / 87250 Post Limited 12,307.69 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Pudukottai and Geochemical Enhancement Quotations Envelope ion Data Processing Centre at Trichy. NHP-2020-2021-TN-502054 / Renovation of Sub Divisional Pending Institutional Capacity Request for Single Stage - One Data Processing Centre at IBRD / 87250 Post Limited 10,769.23 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Enhancement Quotations Envelope Nagerkoil, Thoothukudi and ion Tirunelveli. NHP-2020-2021-TN-505614 / Pending Renovation of Sub Divisional Institutional Capacity Request for Single Stage - One IBRD / 87250 Post Limited 4,615.38 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Data Processing Centres at Enhancement Quotations Envelope ion Chennai for Gaugings. NHP-2020-2021-TN-923771 / Renovation of Sub Divisional Pending Institutional Capacity Request for Single Stage - One Data Processing Centres at IBRD / 87250 Post Limited 15,384.62 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Enhancement Quotations Envelope Dindigul, Madurai and ion Geochemical Lab in Madurai. Page 5 NHP-2020-2021-TN-990368 / Renovation of Sub Divisional Data Processing Centres at Pending Institutional Capacity Request for Single Stage - One Virudhunagar, Devakottai IBRD / 87250 Post Limited 12,307.69 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Enhancement Quotations Envelope and Geological Data ion Processing Centre at Karaikudi. NHP-2020-2021-TN-745579 / Pending Renovation of Sub Divisional Institutional Capacity Request for Single Stage - One IBRD / 87250 Post Limited 15,384.62 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Data Processing Centres at Enhancement Quotations Envelope ion Thanjavur. NHP-2020-2021-TN-316977 / Renovation of State Data Processing Centres, Chennai, Pending Institutional Capacity Request for Single Stage - One Regional Data Processing IBRD / 87250 Post Limited 30,769.23 0.00 Implementat 2020-06-15 2020-08-10 2021-02-08 Enhancement Quotations Envelope Centre Chennai and Sub ion Divisional Data Processing Centre, Chengalpet. GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-TAMIL NADU -29283- Pending Water Resources Monitoring Request for Single Stage - One GO-RFQ / Package I Water IBRD / 87250 Post Limited 60,000.00 0.00 Implementati 2017-10-03 2017-11-28 2017-12-27 System Quotations Envelope Quality Equipment on IN-TAMIL NADU -29575- GO-RFQ / Pacakge IV Pending Water Resources Monitoring Request for Single Stage - One DWLR Telemetry, DWLR IBRD / 87250 Post Limited 55,385.00 0.00 Implementati 2017-10-03 2017-11-28 2017-12-27 System Quotations Envelope Telemetry with water quality on prob IN-TAMIL NADU -46723- GO-RFQ / Providing furniture to Data processing Pending Institutional Capacity Request for Single Stage - One centres in Ground Water IBRD / 87250 Post Limited 6,154.00 0.00 Implementati 2018-02-01 2018-03-13 2018-05-12 Enhancement Quotations Envelope Division office, Madurai , on Tirunelveli and Ground Water Circle office, Madurai. IN-TAMIL NADU -46726- GO-RFQ / Providing Furnitures to Data Pending Processing Centres in Institutional Capacity Request for Single Stage - One IBRD / 87250 Post Limited 9,231.00 0.00 Implementati 2018-02-12 2018-04-02 2018-05-31 Ground Water Division office Enhancement Quotations Envelope on at Thanjavur, Salem and Ground Water Circle office,Thanjavur. IN-TAMIL NADU -49552- GO-RFQ / Providing Furnitures to Data Processing Centres in Pending Institutional Capacity Request for Single Stage - One Ground Water Division IBRD / 87250 Post Limited 12,308.00 0.00 Implementati 2018-03-05 2018-04-30 2018-10-29 Enhancement Quotations Envelope office,Cuddalore, on Vellore,Chennai and Gauging Division office, Chennai. IN-TAMIL NADU -42599- Pending GO-DIR / Procurement of Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 19,385.00 0.00 Implementati 2018-01-16 2018-03-13 2018-05-14 field vehicles for data System Quotations Envelope on collection Page 6 NHP-2018-2019-TN-825886 / Under Water Resources Monitoring Single Stage - One Supply and installation of IBRD / 87250 Post Request for Bids Open - National 913,846.15 0.00 Implementati 2018-12-24 2019-03-05 2018-12-29 2019-03-07 2019-02-09 2019-03-11 2019-04-15 2019-10-12 System Envelope GW RTDAS on Pending NHP-2018-2019-TN-994416 / Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 79,230.77 0.00 Implementati 2018-12-10 2019-02-04 2019-08-03 Geophysical Equipment System Quotations Envelope on Pending NHP-2018-2019-TN-946575 / Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 4,230.77 0.00 Implementati 2018-12-10 2019-02-04 2019-08-03 Manual SRG System Quotations Envelope on Pending NHP-2018-2019-TN-274157 / Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 41,076.92 0.00 Implementati 2018-12-10 2019-02-04 2019-08-03 Borewell Camera System Quotations Envelope on NHP-2018-2019-TN-437299 / Pending Handheld Acoustic Doppler Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 27,692.31 0.00 Implementati 2018-12-10 2019-02-04 2019-08-03 current meter with wading System Quotations Envelope on rod Pending NHP-2018-2019-TN-254829 / Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 38,461.54 0.00 Implementati 2018-12-10 2019-02-04 2019-08-03 Video conferencing equipment System Quotations Envelope on NHP-2018-2019-TN-611791 / Pending Water Resources Monitoring Single Stage - One Supply and installation of IBRD / 87250 Post Request for Bids Open - National 1,084,615.38 0.00 Implementati 2018-12-18 2018-12-23 2019-02-03 2019-03-05 2019-04-09 2019-10-06 System Envelope Surface water RTDAS on Pending NHP-2018-2019-TN-100272 / Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 45,384.62 0.00 Implementati 2018-12-10 2019-02-04 2019-08-03 Printer, Scanner, Projector System Quotations Envelope on NHP-2018-2019-TN-809607 / Under Water Resources Monitoring Request for Single Stage - One Computer, Laptop, IBRD / 87250 Post Limited 58,769.23 0.00 Implementati 2018-12-10 2019-01-09 2019-02-04 2019-08-03 System Quotations Envelope Workstation on NHP-2018-2019-TN-947298 / Under Water Resources Monitoring Request for Single Stage - One Equipment for 3 WQ labs at IBRD / 87250 Post Limited 92,307.69 0.00 Implementati 2018-12-10 2019-03-01 2019-02-04 2019-08-03 System Quotations Envelope Chennai, Madurai & Trichi on NHP-2018-2019-TN-506994 / Pending Procurement of Furniture for Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 3,076.92 0.00 Implementati 2018-12-09 2019-02-03 2019-08-02 DDPC, Ground Water System Quotations Envelope on Division, Chennai NHP-2018-2019-TN-394458 / Pending Procurement of Furniture for Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 3,076.92 0.00 Implementati 2018-12-09 2019-02-03 2019-08-02 DDPC, Ground Water System Quotations Envelope on Division, Cuddalore NHP-2018-2019-TN-762544 / Pending Procurement of Furniture for Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 3,076.92 0.00 Implementati 2018-12-09 2019-02-03 2019-08-02 DDPC, Ground Water System Quotations Envelope on Division, Vellore NHP-2018-2019-TN-424222 / Pending Water Resources Monitoring Request for Single Stage - One Procurement of Furniture for IBRD / 87250 Post Limited 3,076.92 0.00 Implementati 2018-12-09 2019-02-03 2019-08-02 System Quotations Envelope RDPC, Chennai on NHP-2018-2019-TN-263631 / Pending Procurement of Furniture for Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 3,076.92 0.00 Implementati 2018-12-09 2019-02-03 2019-08-02 DDPC, Ground Water System Quotations Envelope on Division, Salem Page 7 NHP-2018-2019-TN-332174 / Pending Procurement of Furniture for Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 6,153.85 0.00 Implementati 2018-12-09 2019-02-03 2019-08-02 DDPC and RDPC, Ground System Quotations Envelope on Water Division, Thanjavur NHP-2018-2019-TN-946917 / Pending Procurement of Furniture for Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 3,076.92 0.00 Implementati 2018-12-09 2019-02-03 2019-08-02 DDPC, Ground Water System Quotations Envelope on Division, Madurai NHP-2018-2019-TN-234526 / Pending Procurement of Furniture for Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 3,076.92 0.00 Implementati 2018-12-09 2019-02-03 2019-08-02 DDPC and RDPC, Ground System Quotations Envelope on Water Division, Tirunelveli Pending NHP-2018-2019-TN-762448 / Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 53,230.77 0.00 Implementati 2018-12-10 2019-02-04 2019-08-03 UPS System Quotations Envelope on NHP-2019-2020-TN-243604 / Pending Water Resources Monitoring Single Stage - Two Electric Logger_Vehicle IBRD / 87250 Post Request for Bids Limited 115,384.62 0.00 Implementati 2019-12-02 2019-12-08 2020-01-19 2020-04-02 2020-05-07 2020-11-03 System Envelope mounted on NHP-2019-2020-TN-253333 / Pending Water Resources Monitoring Request for Single Stage - One Development of Information IBRD / 87250 Post Limited 15,384.62 0.00 Implementati 2019-11-06 2020-01-02 2020-06-30 System Quotations Envelope Boards on NHP-2019-2020-TN-908762 / Pending Institutional modernization Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 7,692.31 0.00 Implementati 2019-11-06 2020-01-02 2020-06-30 support & internet lease line System Quotations Envelope on charges Pending NHP-2019-2020-TN-274667 / Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 13,846.15 0.00 Implementati 2019-12-09 2020-02-03 2020-08-03 Total station 1 for CE office System Quotations Envelope on NHP-2019-2020-TN-572205 / Pending Water Resources Monitoring Request for Single Stage - One Procurement of spatial data, IBRD / 87250 Post Limited 15,384.62 0.00 Implementati 2019-12-09 2020-02-03 2020-08-03 System Quotations Envelope satellite product etc., on Pending NHP-2019-2020-TN-179216 / Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 18,461.54 0.00 Implementati 2019-12-09 2020-02-03 2020-08-03 Geological Field Kit System Quotations Envelope on Pending NHP-2019-2020-TN-806425 / Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 4,615.38 0.00 Implementati 2019-11-20 2020-01-19 2020-07-17 Soil infiltrometers System Quotations Envelope on NHP-2019-2020-TN-722077 / Pending Water Resources Monitoring Request for Single Stage - One LCD Screens for conference IBRD / 87250 Post Limited 23,076.92 0.00 Implementati 2019-11-20 2020-01-19 2020-07-17 System Quotations Envelope halls on NHP-2019-2020-TN-414993 / Procurement of Office Pending Water Resources Monitoring Request for Single Stage - One Furniture, AC, Non-ITC IBRD / 87250 Post Limited 15,384.62 0.00 Implementati 2019-11-20 2020-01-20 2020-07-20 System Quotations Envelope equipment etc for Training on centres NHP-2020-2021-TN-544414 / Pending Water Resources Information Single Stage - One DWLR (Telemetry) (New IBRD / 87250 Post Request for Bids Open - National 1,061,538.46 0.00 Implementati 2020-06-03 2020-06-08 2020-07-20 2020-08-19 2020-09-23 2021-03-22 Systems Envelope Proposal) on Pending NHP-2020-2021-TN-278685 / Water Resources Information Single Stage - One IBRD / 87250 Post Request for Bids Limited 115,384.62 0.00 Implementati 2020-06-03 2020-06-08 2020-07-20 2020-08-19 2020-09-23 2021-03-22 ADCP Systems Envelope on Page 8 Pending NHP-2020-2021-TN-477076 / Water Resources Information Single Stage - One IBRD / 87250 Post Request for Bids Limited 100,000.00 0.00 Implementati 2020-06-16 2020-06-22 2020-08-03 2020-09-02 2020-10-07 2021-04-05 Mobile Water Quality Lab Systems Envelope on Pending NHP-2020-2021-TN-120775 / Water Resources Monitoring Request for Single Stage - One IBRD / 87250 Post Limited 15,384.62 0.00 Implementati 2020-06-03 2020-07-29 2021-01-27 Hiring of Vehicles System Quotations Envelope on NHP-2020-2021-TN-996405 / Pending Water Resources Monitoring Request for Single Stage - One AAS (Automatic Absorption IBRD / 87250 Post Limited 69,230.77 0.00 Implementati 2020-06-15 2020-08-10 2021-02-08 System Quotations Envelope Spectrometer) on Pending NHP-2020-2021-TN-212944 / Water Resources Information Request for Single Stage - One IBRD / 87250 Post Limited 27,692.31 0.00 Implementati 2020-06-15 2020-08-10 2021-02-08 Handheld GPS Systems Quotations Envelope on Pending NHP-2020-2021-TN-717195 / Water Resources Operations Request for Single Stage - One IBRD / 87250 Post Limited 27,692.31 0.00 Implementati 2020-06-15 2020-08-10 2021-02-08 Total Station and Planning System Quotations Envelope on Pending NHP-2020-2021-TN-555102 / Water Resources Information IBRD / 87250 Post Direct Selection Direct 130,769.23 0.00 Implementati 2020-05-28 2020-05-31 2020-07-13 2021-01-11 ARC GIS SOFTWARE Systems on NHP-2020-2021-TN-785234 / Pending Water Resources Monitoring Request for Single Stage - One Electric Logger_Vehicle IBRD / 87250 Post Limited 92,307.69 0.00 Implementati 2020-06-22 2020-08-17 2021-02-15 System Quotations Envelope mounted on NHP-2020-2021-TN-663546 / Pending Procurement of Furniture for Institutional Capacity Request for Single Stage - One IBRD / 87250 Post Limited 3,076.92 0.00 Implementati 2020-06-15 2020-08-10 2021-02-08 DDPC, Ground Water Enhancement Quotations Envelope on Division, Chennai NHP-2020-2021-TN-583564 / Pending Procurement of Furniture for Institutional Capacity Request for Single Stage - One IBRD / 87250 Post Limited 3,076.92 0.00 Implementati 2020-06-15 2020-08-10 2021-02-08 DDPC, Ground Water Enhancement Quotations Envelope on Division, Cuddalore NHP-2020-2021-TN-610165 / Pending Procurement of Furniture for Institutional Capacity Request for Single Stage - One IBRD / 87250 Post Limited 3,076.92 0.00 Implementati 2020-06-15 2020-08-10 2021-02-08 DDPC, Ground Water Enhancement Quotations Envelope on Division, Salem NHP-2020-2021-TN-739194 / Pending Procurement of Furniture for Institutional Capacity Request for Single Stage - One IBRD / 87250 Post Limited 3,076.92 0.00 Implementati 2020-06-15 2020-08-10 2021-02-08 DDPC, Ground Water Enhancement Quotations Envelope on Division, Vellore NHP-2020-2021-TN-334204 / Pending Institutional Capacity Request for Single Stage - One Procurement of Furniture for IBRD / 87250 Post Limited 3,076.92 0.00 Implementati 2020-06-15 2020-08-10 2021-02-08 Enhancement Quotations Envelope RDPC, Chennai on NHP-2020-2021-TN-100971 / Pending Procurement of Furniture for Institutional Capacity Request for Single Stage - One IBRD / 87250 Post Limited 6,153.85 0.00 Implementati 2020-06-15 2020-08-10 2021-02-08 DDPC and RDPC, Ground Enhancement Quotations Envelope on Water Division, Thanjavur NHP-2020-2021-TN-194136 / Pending Procurement of Furniture for Institutional Capacity Request for Single Stage - One IBRD / 87250 Post Limited 3,076.92 0.00 Implementati 2020-06-15 2020-08-10 2021-02-07 DDPC, Ground Water Enhancement Quotations Envelope on Division, Madurai NHP-2020-2021-TN-583520 / Pending Procurement of Furniture for Institutional Capacity Request for Single Stage - One IBRD / 87250 Post Limited 3,076.92 0.00 Implementati 2020-06-15 2020-08-10 2021-02-08 DDPC and RDPC, Ground Enhancement Quotations Envelope on Water Division, Tirunelveli Page 9 NHP-2020-2021-TN-228559 / Pending Water Resources Information Single Stage - One Water Quality Equipment for IBRD / 87250 Post Request for Bids Limited 115,384.62 0.00 Implementati 2020-06-16 2020-06-22 2020-08-03 2020-09-03 2020-10-08 2021-04-06 Systems Envelope Lab on NHP-2020-2021-TN-134898 / Procurement of Information Brochures for awareness Pending Water Resources Operations Request for Single Stage - One programs and other IBRD / 87250 Post Limited 15,384.62 0.00 Implementati 2020-06-22 2020-08-17 2021-02-15 and Planning System Quotations Envelope information related to on services being offered by this department. NHP-2020-2021-TN-166229 / Procurement of Printers and Pending Institutional Capacity Request for Single Stage - One UPS for State, Regional IBRD / 87250 Post Limited 79,538.46 0.00 Implementati 2020-06-28 2020-08-24 2021-02-22 Enhancement Quotations Envelope Divisional & Sub Divisional on Data Centres NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NHP-2018-2019-TN-911678 / AMC for DGPS for 3 years Pending Water Resources Monitoring Request for Single Stage - One for 3 sets of DGPS. 3 BASE IBRD / 87250 Post Limited 46,153.85 0.00 Implementati 2018-12-07 2019-02-01 2021-07-31 System Quotations Envelope UNITS AND 6 ROVER on UNITS. NHP-2018-2019-TN-565471 / Conducting of Topographic Pending Water Resources Monitoring Request for Single Stage - One Survey and development of IBRD / 87250 Post Limited 96,107.69 0.00 Implementati 2018-12-06 2019-01-31 2019-07-30 System Quotations Envelope Basin Information System on for Tamiraparani Basin NHP-2018-2019-TN-646204 / Conducting of Topographic Pending Water Resources Information Single Stage - One Survey and development of IBRD / 87250 Post Request for Bids Open - National 141,138.46 0.00 Implementati 2018-12-01 2018-12-06 2019-01-17 2019-02-16 2019-03-23 2019-09-19 Systems Envelope Basin Information System on for Agniyar Basin NHP-2018-2019-TN-696537 / Pending Water Resources Monitoring Request for Single Stage - One Cloud Storage for state data IBRD / 87250 Post Limited 15,384.62 0.00 Implementati 2018-12-31 2019-02-25 2019-08-24 System Quotations Envelope centres on NHP-2019-2020-TN-990035 / Pending Water Resources Monitoring Request for Single Stage - One Benchmarking studies of IBRD / 87250 Post Limited 15,384.62 0.00 Implementati 2019-12-09 2020-02-03 2020-08-03 System Quotations Envelope selected basin on NHP-2019-2020-TN-905107 / Pending Water Resources Monitoring Request for Single Stage - One Development of Annual IBRD / 87250 Post Limited 15,384.62 0.00 Implementati 2019-12-09 2020-02-03 2020-08-03 System Quotations Envelope reports & maps on NHP-2020-2021-TN-348439 / Conducting of Topographic Pending Survey and Development of Water Resources Monitoring Single Stage - One IBRD / 87250 Post Request for Bids Open - National 153,846.15 0.00 Implementati 2020-06-09 2020-06-15 2020-07-27 2020-08-26 2020-09-30 2021-03-29 Basin Information System System Envelope on for Varahanadhi and Vaigai Basins CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 10 NHP-2019-2020-TN-168815 / Consultant Water Resources Monitoring Pending Customisation of IBRD / 87250 Post Qualification Open - National 7,692.31 0.00 2019-12-02 2019-12-23 2020-02-05 2020-03-06 2020-04-10 2020-10-07 System Implementation SWDES/eSWIS/eGEM/GWDE Selection S NHP-2019-2020-TN-871656 / Consultant Water Resources Monitoring Pending Development of Mobile IBRD / 87250 Post Qualification Open - National 15,384.62 0.00 2019-12-02 2019-12-23 2020-02-05 2020-03-06 2020-04-10 2020-10-07 System Implementation Applications Selection NHP-2019-2020-TN-803760 / State WRIs chapter Consultant including linkages with India- Water Resources Monitoring Pending IBRD / 87250 Post Qualification Open - National 46,153.85 0.00 2019-12-02 2019-12-23 2020-02-05 2020-03-06 2020-04-10 2020-10-07 WRIS & Upgradation of System Implementation Selection TNWRIS including hardware, software etc NHP-2019-2020-TN-251489 / Pilot IWRM study on village level water budgeting on Water Resources Monitoring Quality And Cost- Pending village level mapping of IBRD / 87250 Post Open - National 384,615.38 0.00 2019-12-02 2019-12-23 2020-02-05 2020-03-04 2020-04-03 2020-05-08 2020-06-12 2021-06-14 System Based Selection Implementation water infrastructure and assessing the surface and ground water INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 11