PROCUREMENT PLAN (Textual Part) Project information: Central African Republic – Reintegration of Ex- Combatants Project - P160272 Project Implementation agency: Disarmament, Demobilization, Reintegration, and Repatriation Project Implementation Unit (Unité d’Exécution du Programme National de DDRR - UEPNDDRR) Date of the Procurement Plan: 19 juin 2018 Period covered by this Procurement Plan: 21 janvier 2018 au 20 juillet 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Public Procurement Code, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [is not applicable]; Works: [is not applicable] Other Relevant Procurement Information. PROCUREMENT Central African Republic : Reintegration of Ex-combatants Project PLAN General Information Country: Central African Republic Bank’s Approval Date of the Original Procurement Plan: 2018-06-23 2021-04-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P160272 GPN Date: Project Name: Reintegration of Ex-combatants Project Loan / Credit No: IDA / D1800 Reintegration of Ex-combatants Project Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CF-UEPNDDRR-009-GO-ED / logiciel comptable - Passation de acquisition, paramétrage du IDA / D1800 Project Management A posteriori marché de gré à Direct 33,962.00 0.00 Annulé 2018-03-30 2018-08-13 2018-04-04 2018-06-07 2018-05-09 2018-11-05 logiciel et formation du gré personnel clé CF-UEPNDDRR-09-GO-DIR / Logiciel comptable: Passation de fourniture, paramétrage du IDA / D1800 Project Management A priori marché de gré à Direct 33,962.00 0.00 Annulé 2018-09-20 2018-09-25 2018-10-30 2019-04-28 logiciel et formation du gré personnel clé CF-UEPNDDRR-145415-GO- Social and Economic Single Stage - One RFQ / Mobiliers de bureau IDA / D1800 A posteriori Demande de prix Open - National 17,321.00 8,017.19 Signé 2019-11-25 2020-01-20 2019-12-23 2020-07-18 Reintegration Support Envelope UEPNDDRR Bangui CF-UEPNDDRR-145417-GO- RFQ / Mobiliers de bureaux Social and Economic Single Stage - One IDA / D1800 A posteriori Demande de prix Open - National 17,321.00 8,662.96 Achevé 2019-12-08 2020-02-02 2020-01-21 2020-07-31 2020-01-23 pour les trois régions (Bouar, Reintegration Support Envelope Paoua et Bria) CF-UEPNDDRR-145420-GO- RFQ / Matériels Informatiques Social and Economic Single Stage - One IDA / D1800 A posteriori Demande de prix Open - National 35,357.00 22,434.58 Achevé 2019-12-14 2020-02-08 2020-03-31 2020-08-06 2020-04-21 Régionaux (Bouar, Paoua et Reintegration Support Envelope Bria) CF-UEPNDDRR-145422-GO- RFQ / Fournitures de bureau Social and Economic Single Stage - One IDA / D1800 A posteriori Demande de prix Open - National 26,786.00 5,671.04 Achevé 2019-11-30 2020-01-25 2020-04-10 2020-07-23 2020-04-17 Régionales (Bouar, Paoua et Reintegration Support Envelope Bria) CF-UEPNDDRR-145468-GO- Social and Economic Single Stage - One RFQ / Matériels Informatiques IDA / D1800 A posteriori Demande de prix Open - National 68,286.00 60,452.28 Signé 2019-07-23 2019-09-17 2019-06-03 2020-03-15 Reintegration Support Envelope UEPNDDRR Bangui CF-UEPNDDRR-145451-GO- Social and Economic Single Stage - One RFQ / Fournitures de bureau IDA / D1800 A posteriori Demande de prix Open - National 11,870.00 11,163.84 Signé 2019-07-23 2019-09-17 2019-06-03 2020-03-15 Reintegration Support Envelope Bangui CF-UEPNDDRR-145460-GO- Social and Economic Single Stage - One IDA / D1800 A posteriori Demande de prix Open - International 32,143.00 28,774.33 Signé 2018-10-06 2018-12-01 2019-06-08 2019-05-30 RFQ / Logiciel TOMPRO Reintegration Support Envelope CF-UEPNDDRR-145452-GO- RFQ / Deux véhicules 4x4 Social and Economic Single Stage - One IDA / D1800 A posteriori Demande de prix Open - National 107,143.00 85,547.40 Signé 2019-08-26 2019-10-21 2019-10-21 2020-04-18 (Pick-up et Urbain) pour Reintegration Support Envelope Bangui CF-UEPNDDRR-145425-GO- Social and Economic Single Stage - One RFQ / Connexion Internet IDA / D1800 A posteriori Demande de prix Open - National 24,000.00 25,554.37 Achevé 2019-12-21 2020-02-15 2020-03-31 2020-08-13 2020-08-31 Reintegration Support Envelope VSAT UEPNDFDRR Bangui CF-UEPNDDRR-020-GO-RFQ / Matériels informatiques et Single Stage - One IDA / D1800 Project Management A posteriori Demande de prix Limited 72,151.00 0.00 Annulé 2018-08-22 2018-10-17 2019-04-15 de bureautique: acquisition Envelope Bangui CF-UEPNDDRR-9-GO-RFQ / Single Stage - One IDA / D1800 Project Management A posteriori Demande de prix Limited 33,962.00 0.00 Annulé 2018-11-14 2019-01-09 2019-07-08 logiciel comptable: acquisition Envelope CF-UEPNDDRR-021-GO-RFQ Single Stage - One / Mobiliers de bureaux: IDA / D1800 Project Management A posteriori Demande de prix Limited 18,302.00 0.00 Annulé 2019-03-16 2019-05-11 2019-11-07 Envelope antennes régionales CF-UEPNDDRR-032-GO-RFQ / Informatique: acquisition de Single Stage - One IDA / D1800 Project Management A posteriori Demande de prix Limited 80,000.00 0.00 Annulé 2018-11-14 2019-01-09 2019-07-08 matériels pour l'UEPNDDR à Envelope Bangui et à Bouar CF-UEPNDDRR-161830-GO- RFQ / Trois (03) véhicules Pick- Social and Economic Single Stage - One up pour les trois bureaux IDA / D1800 A posteriori Demande de prix Open - National 114,999.00 122,017.50 Achevé 2020-03-18 2020-05-13 2020-05-13 2020-11-09 2020-06-29 Reintegration Support Envelope régionaux (Bouar, Paoua et Bria) CF-UEPNDDRR-167353-GO- Social and Economic Single Stage - One RFQ / Mobiliers de bureau IDA / D1800 A posteriori Demande de prix Open - National 10,000.00 7,912.72 Signé 2020-04-19 2020-06-14 2020-05-01 2020-12-11 Reintegration Support Envelope pour l'UEPNDDRR de Bangui Page 1 CF-UEPNDDRR-161816-GO- RFQ / Matériels de bureau (réfrigérateur, coffre fort, Social and Economic Single Stage - One IDA / D1800 A posteriori Demande de prix Open - National 9,160.00 0.00 Annulé 2020-03-16 2020-05-11 2020-11-07 climatiseur et dispositif Reintegration Support Envelope incendie) pour l'UEPNDDRR de Bangui. CF-UEPNDDRR-161839-GO- RFQ / Kits solaires pour les Social and Economic Single Stage - One IDA / D1800 A posteriori Demande de prix Open - National 9,999.00 0.00 Annulé 2020-03-14 2020-05-09 2020-11-05 trois bureaux régionaux Reintegration Support Envelope (Bouar, Paoua et Bria). CF-UEPNDDRR-161850-GO- RFQ / Equipements Station Social and Economic Single Stage - One IDA / D1800 A posteriori Demande de prix Open - National 200,000.00 0.00 Annulé 2020-03-28 2020-05-23 2020-11-19 Radio communication de Reintegration Support Envelope l'UEPNDDRR de Bangui CF-UEPNDDRR-161824-GO- Social and Economic Single Stage - One RFQ / Groupe électrogène IDA / D1800 A posteriori Demande de prix Open - National 100,000.00 0.00 Annulé 2020-03-17 2020-05-12 2020-11-08 Reintegration Support Envelope pour l'UEPNDDRR de Bangui. CF-UEPNDDRR-145427-GO- RFQ / Dispositif incendie Social and Economic Single Stage - One IDA / D1800 A posteriori Demande de prix Open - National 30,357.00 0.00 Annulé 2019-11-30 2020-01-25 2020-07-23 (Extincteurs) UEPNDDRR Reintegration Support Envelope Bangui CF-UEPNDDRR-230841-GO- RFQ / Matériels de Bureau Social and Economic Single Stage - One En attente IDA / D1800 A posteriori Demande de prix Limited 21,818.00 0.00 2021-05-22 2021-07-17 2022-01-13 (Dispositif incendie, coffre Reintegration Support Envelope d'exécution fort, Climatiseurs,....) CF-UEPNDDRR-230846-GO- RFQ / Matériels informatiques Social and Economic Single Stage - One En attente IDA / D1800 A posteriori Demande de prix Limited 18,182.00 0.00 2021-06-06 2021-08-01 2022-01-28 et bureautique de l'UEPNDDRR Reintegration Support Envelope d'exécution Bangui CF-UEPNDDRR-230907-GO- RFQ / Kits panneaux solaire Social and Economic Single Stage - One En attente IDA / D1800 A posteriori Demande de prix Limited 13,091.00 0.00 2021-07-25 2021-09-19 2022-03-18 pour les bureaux régionaux Reintegration Support Envelope d'exécution de l'UEPNDDRR. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CF-UEPNDDRR-022-NC-DIR / Partenaire d'exécution: Passation de Social and Economic recrutement ONG ACTED pour IDA / D1800 A priori marché de gré à Direct 7,800,000.00 0.00 Annulé 2018-08-16 2018-08-29 2018-08-21 2018-08-30 2018-09-25 2019-03-24 Reintegration Support réaliser les activités des gré composante 1 et 2 CF-UEPNDDRR-023-NC-DIR / Partenaire d'exécution: Passation de recrutement de l'organisation Social and Economic IDA / D1800 A priori marché de gré à Direct 6,936,949.00 5,971,653.00 Signé 2018-08-16 2018-10-04 2018-08-21 2018-09-25 2019-03-28 2019-03-24 internationale O.I.M en vue de Reintegration Support gré réaliser les activités des composantes 1 et 2 CF-UEPNDDRR-22-NC-DIR / Partenaire d'exécution: recrutement de l'ONG ACTEF Passation de pour effectuer la mise en Social and Economic IDA / D1800 A priori marché de gré à Direct 8,030,000.00 7,368,970.00 Signé 2018-09-10 2018-10-04 2018-09-15 2018-10-20 2019-03-28 2019-04-18 œuvre des composantes Reintegration Support gré 1"Appui aux Ex combattants" et 2 "Appui aux communautés d'accueil" CF-UEPNDDRR-156028-NC- Passation de DIR / Location d'un Bâtiment Social and Economic IDA / D1800 A posteriori marché de gré à Direct 120,000.00 269,425.44 Signé 2020-01-30 2020-01-21 2020-02-04 2020-01-02 2020-03-10 2020-01-31 2020-09-06 R+1 servant de Bureau à Reintegration Support gré l'UEPPNDDRR de Bangui. CF-UEPNDDRR-167348-NC- Passation de Social and Economic DIR / Société de Gardiennage IDA / D1800 A posteriori marché de gré à Direct 5,000.00 10,746.80 Signé 2020-04-10 2020-04-03 2020-04-15 2020-04-10 2020-05-20 2020-04-21 2020-11-16 Reintegration Support à l'UEPNDDRR de Bangui. gré CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CF-UEPNDDRR-145186-CS- LCS / Cabinet pour l'Audit Financier et Comptable du PNDDRR Financé d’une part par la Banque Mondiale Sélection fondée Social and Economic (Période du 1er janvier 2018 IDA / D1800 A priori sur la qualité et le Open - International 56,604.00 0.00 Annulé 2020-02-10 2020-03-06 2020-03-02 2020-04-15 2020-05-13 2020-06-12 2020-07-17 2020-08-21 2021-08-21 Reintegration Support au 31 décembre 2020) et les coût Fonds de la CEMAC (Période du 1er janvier 2019 au 31décembre 2020) en République Centrafricaine. CF-UEPNDDRR-165542-CS- LCS / Audit Financier et Comptable du Programme National de Désarmement, Démobilisation, Réintégration Social and Economic Sélection au IDA / D1800 A priori Open - National 56,604.00 25,957.08 Signé 2020-04-10 2020-04-20 2020-05-01 2020-06-14 2020-04-24 2020-07-12 2020-04-14 2020-08-11 2020-04-27 2020-09-15 2020-05-17 2020-10-20 2020-05-19 2021-04-18 et Rapatriement (PNDDRR) Reintegration Support moindre coût Financé d’une part par la Banque Mondiale (Volet Réintégration des Ex- combattant) CF-UEPNDDRR-008-SC-MC / Sélection au Audit externe: recrutement IDA / D1800 Project Management A priori Open - International 35,000.00 0.00 Annulé 2018-07-05 2018-07-26 2018-09-08 2018-10-06 2018-11-05 2018-12-10 2019-01-14 2019-07-13 moindre coût d'un cabinet d'audit Page 2 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CF-UEPNDDRR-004-CS-INDV / Sauvegarde instruments: Recrutement Consultant international chargé de l Elaboration des documents de sauvegarde : Cadre de IDA / D1800 Project Management A posteriori Individuel Open 40,388.00 32,724.82 Signé 2018-03-12 2018-06-18 2018-04-30 2018-05-21 2020-05-01 2018-06-25 2020-05-01 2018-12-22 Gestion environnementale et Sociale, Cadre de Politique de Réinstallation et Plan cadre de Gestion des Pestes et Pesticides CF-UEPNDDRR-013-CS-INDV / assistant IDA / D1800 Project Management A posteriori Individuel Open 20,377.00 1,598.50 Achevé 2017-04-26 2017-05-02 2017-05-13 2017-12-07 2017-06-17 2017-12-12 2017-12-14 2018-12-14 financier:recrutement d'un consultant CF-UEPNDDRR-011-CS-INDV / Passation des marchés: IDA / D1800 Project Management A posteriori Individuel Open 29,434.00 2,252.06 Achevé 2017-04-26 2017-05-17 2017-05-15 2017-12-05 2017-05-22 2017-12-12 2017-05-31 2017-12-11 2017-11-27 2018-12-14 recrutement de consultant CF-UEPNDDRR-010-CS-INDV / Gestionnaire IDA / D1800 Project Management A posteriori Individuel Open 29,434.00 88,302.00 Achevé 2017-04-26 2017-07-31 2017-05-29 2017-11-14 2017-06-08 2017-11-14 2017-07-04 2017-12-11 2017-12-31 2018-12-14 financier:recrutement consultant CF-UEPNDDRR-012-CS-INDV / Coordonnateur général: IDA / D1800 Project Management A posteriori Individuel Open 33,962.00 3,464.86 Achevé 2017-04-24 2017-05-11 2017-05-12 2018-03-21 2017-06-03 2018-04-09 2017-11-30 2019-03-22 recrutement d'un consultant CF-UEPNDDRR-014-CS-INDV / Communication IDA / D1800 Project Management A posteriori Individuel Open 29,434.00 2,252.06 Achevé 2017-04-26 2017-05-03 2017-05-04 2017-11-21 2017-06-08 2017-12-12 2017-12-05 2018-12-14 Bangui:recrutemen d'un consultant CF-UEPNDDRR-016-CS-INDV / Assistant administratif: IDA / D1800 Project Management A posteriori Individuel Open 10,566.00 17,223.36 Signé 2018-08-02 2018-01-23 2018-09-20 2018-10-11 2018-07-16 2018-11-15 2018-07-26 2019-05-14 Consultant UEPNDDRR Bangui CF-UEPNDDRR-4-CS-INDV / Instruments de sauvegarde: IDA / D1800 Project Management A posteriori Individuel Direct 40,388.00 0.00 Annulé 2018-08-10 2018-08-20 2018-09-10 2018-10-15 2019-04-13 consultant international CF-UEPNDDRR-018-CS-INDV / Chargé Système Information IDA / D1800 Project Management A posteriori Individuel Open 29,434.00 79,548.95 Signé 2018-09-07 2017-05-08 2018-10-26 2018-11-16 2018-10-31 2018-12-21 2018-11-02 2019-06-19 et de Gestion CF-UEPNDDRR-023-CS-INDV / Chargé des opérations: Social and Economic IDA / D1800 A posteriori Individuel Limited 90,000.00 494,167.00 Signé 2018-09-14 2018-09-25 2018-09-19 2018-09-12 2018-10-10 2018-10-10 2018-11-14 2018-11-20 2019-05-13 recrutement d'un consultant Reintegration Support international à l'UEPNDDRR CF-UEPNDDRR-007-CS-INDV / Chauffeurs régionaux : IDA / D1800 Project Management A posteriori Individuel Open 3,962.00 0.00 Annulé 2018-06-28 2018-08-16 2018-09-06 2018-10-11 2019-04-09 recrutement de 03 consultants CF-UEPNDDRR-02-CS-INDV / BOUAR: Coordonnateur IDA / D1800 Project Management A posteriori Individuel Direct 29,434.00 41,159.04 Achevé 2018-07-27 2018-01-12 2018-08-06 2018-08-27 2018-07-27 2018-10-01 2018-08-02 2019-03-30 2020-06-23 régional CF-UEPNDDRR-015-CS-INDV / Chargé Administration, Ressources humaines et IDA / D1800 Project Management A posteriori Individuel Open 25,472.00 31,238.64 Achevé 2019-02-21 2017-10-23 2019-04-11 2018-02-01 2019-05-02 2018-02-05 2019-06-06 2018-03-26 2019-12-03 2019-03-25 logistique: Consultant UEPNDDRR CF-UEPNDDRR-96171-CS- Sélection de CDS / Assistant Administratif IDA / D1800 Project Management A posteriori consultants par Direct 20,377.00 74,955.84 Signé 2019-02-21 2019-03-06 2019-03-03 2019-05-07 2019-03-12 2019-11-03 et Financier de l'UEPNDDRR entente directe CF-UEPNDDRR-96174-CS- CDS / Chargé de Mesures de Sélection de Sauvegarde IDA / D1800 Project Management A posteriori consultants par Direct 17,170.00 50,022.57 Signé 2019-02-21 2019-03-06 2019-03-03 2019-05-07 2019-03-12 2019-11-03 (environnementales et entente directe Sociales) de l'UEPNDDRR CF-UEPNDDRR-96161-CS- INDV / Spécialiste Passation IDA / D1800 Project Management A posteriori Individuel Limited 29,434.00 0.00 Annulé 2019-02-21 2019-02-26 2019-03-19 2019-04-23 2019-10-20 des Marchés CF-UEPNDDRR-112352-CS- IDA / D1800 Project Management A posteriori Individuel Direct 27,857.00 109,984.31 Signé 2019-03-25 2018-12-14 2019-04-04 2019-03-15 2019-04-25 2019-03-19 2019-05-30 2019-03-26 2019-11-26 INDV / Gestionnaire Financier CF-UEPNDDRR-112365-CS- INDV / Spécialiste en IDA / D1800 Project Management A posteriori Individuel Open 27,857.00 89,073.09 Signé 2019-04-09 2019-04-09 2019-05-28 2019-06-06 2019-06-18 2019-08-22 2019-07-23 2019-08-26 2020-01-19 passation des marchés CF-UEPNDDRR-112361-CS- INDV / Assistant du IDA / D1800 Project Management A posteriori Individuel Open 19,285.14 49,777.32 Signé 2019-04-09 2019-04-09 2019-05-28 2019-06-06 2019-06-18 2019-06-14 2019-07-23 2019-08-12 2020-01-19 Spécialiste en Passation des Marchés CF-UEPNDDRR-112366-CS- INDV / Chargé de IDA / D1800 Project Management A posteriori Individuel Open 27,857.14 70,158.14 Signé 2019-04-09 2019-04-09 2019-05-28 2019-07-03 2019-06-18 2019-07-03 2019-07-23 2019-07-30 2020-01-19 Communication CF-UEPNDDRR-96194-CS- INDV / Chargé de IDA / D1800 Project Management A posteriori Individuel Limited 29,434.00 0.00 Annulé 2019-02-21 2019-02-26 2019-03-19 2019-04-23 2019-10-20 Communication de l'UEPNDDRR à Bangui Page 3 CF-UEPNDDRR-86463-CS- INDV / logistique: consultant IDA / D1800 Project Management A posteriori Individuel Limited 29,434.00 0.00 Annulé 2018-11-09 2018-11-14 2018-12-05 2019-01-09 2019-07-08 à l'UEPNDDRR à Bangui CF-UEPNDDRR-028-CS-INDV / Assistant passation IDA / D1800 Project Management A posteriori Individuel Limited 20,377.00 0.00 Annulé 2018-11-06 2018-11-11 2018-12-02 2019-01-06 2019-07-05 marchés: à l'UEPNDDRR à Bangui CF-UEPNDDRR-112358-CS- IDA / D1800 Project Management A priori Individuel Open 42,857.14 126,031.74 Signé 2019-04-09 2019-06-20 2019-05-28 2019-07-03 2019-06-18 2021-01-05 2019-07-23 2019-07-31 2020-01-19 INDV / Coordonnateur Général CF-UEPNDDRR-134674-CS- INDV / Chargé des ressources IDA / D1800 Project Management A posteriori Individuel Open 32,143.00 47,007.04 Signé 2019-10-31 2019-11-12 2019-12-19 2020-05-06 2020-01-09 2020-05-14 2020-02-13 2020-05-28 2020-08-11 humaines et de l'administration CF-UEPNDDRR-134680-CS- IDA / D1800 Project Management A posteriori Individuel Open 19,286.00 18,102.76 Signé 2019-10-31 2019-11-12 2019-12-19 2020-05-06 2020-01-09 2020-05-22 2020-02-13 2020-05-28 2020-08-11 INDV / Assistant Administratif CF-UEPNDDRR-134681-CS- INDV / Assistant du Chargé IDA / D1800 Project Management A posteriori Individuel Open 19,286.00 34,358.29 Signé 2019-10-31 2019-11-12 2019-12-19 2020-06-15 2020-01-09 2020-06-23 2020-02-13 2020-06-25 2020-08-11 du Système d'Information et de Gestion CF-UEPNDDRR-145470-CS- Social and Economic IDA / D1800 A posteriori Individuel Open 27,857.00 75,280.46 Signé 2018-06-04 2018-01-15 2018-07-23 2019-03-14 2018-08-13 2019-06-12 2018-09-17 2019-06-18 2019-03-16 INDV / Coordonnateur Paoua Reintegration Support CF-UEPNDDRR-145461-CS- Social and Economic IDA / D1800 A posteriori Individuel Open 27,857.00 75,588.90 Signé 2018-06-04 2018-01-15 2018-07-23 2019-03-14 2018-08-13 2019-06-12 2018-09-17 2019-06-18 2019-03-16 INDV / Coordonnateur Bria Reintegration Support CF-UEPNDDRR-145469-CS- Social and Economic INDV / Assistant Administratif IDA / D1800 A posteriori Individuel Open 12,857.00 18,971.59 Signé 2019-01-21 2019-02-01 2019-03-11 2019-06-10 2019-04-01 2019-06-10 2019-05-06 2019-07-19 2019-11-02 Reintegration Support Bouar CF-UEPNDDRR-145478-CS- Social and Economic INDV / Assistant Logisqtique IDA / D1800 A posteriori Individuel Open 12,857.00 13,287.38 Signé 2019-01-21 2019-04-03 2019-03-11 2019-07-05 2019-04-01 2019-07-15 2019-05-06 2019-07-19 2019-11-02 Reintegration Support Bouar CF-UEPNDDRR-145473-CS- INDV / Chargé de Suivi Social and Economic IDA / D1800 A posteriori Individuel Open 27,857.00 42,165.34 Achevé 2018-10-29 2018-09-04 2018-12-17 2019-06-17 2019-01-07 2019-06-10 2019-02-11 2019-06-18 2019-08-10 2020-12-30 Evaluation de l'UEPNDDRR de Reintegration Support Bangui CF-UEPNDDRR-145456-CS- Social and Economic INDV / Chargé de Logistique IDA / D1800 A posteriori Individuel Open 27,857.00 40,103.62 Achevé 2019-05-13 2019-04-09 2019-07-01 2019-07-03 2019-07-22 2019-07-04 2019-08-26 2019-07-08 2020-02-22 2020-12-30 Reintegration Support de l'UEPNDDRR de Bangui CF-UEPNDDRR-145467-CS- INDV / Chargé des Opérations Social and Economic IDA / D1800 A posteriori Individuel Open 27,857.00 49,044.59 Résilié 2017-10-23 2017-10-16 2017-12-11 2018-10-22 2018-01-01 2018-10-31 2018-02-05 2018-11-05 2018-08-04 de réintégration de Reintegration Support l'UEPNDDRR de Bangui CF-UEPNDDRR-145465-CS- INDV / Assistant Chargé de Social and Economic IDA / D1800 A posteriori Individuel Open 12,857.00 13,386.17 Signé 2018-06-04 2018-06-12 2018-07-23 2019-03-13 2018-08-13 2019-07-05 2018-09-17 2019-07-08 2019-03-16 Communication de Reintegration Support l'UEPNDDRR de Bouar CF-UEPNDDRR-145462-CS- INDV / Assistant Chargé de Social and Economic IDA / D1800 A posteriori Individuel Open 12,857.00 19,954.37 Achevé 2018-06-04 2019-06-12 2018-07-23 2019-05-22 2018-08-13 2019-07-05 2018-09-17 2019-07-08 2019-03-16 2020-12-31 Communication de Reintegration Support l'UEPNDDRR à Paoua CF-UEPNDDRR-145464-CS- INDV / Assistant Chargé de Social and Economic IDA / D1800 A posteriori Individuel Open 12,857.00 33,797.77 Signé 2018-06-04 2018-06-12 2018-07-23 2019-07-05 2018-08-13 2019-07-05 2018-09-17 2019-07-08 2019-03-16 Communication de Reintegration Support l'UEPNDDRR de Bria CF-UEPNDDRR-027-CS-INDV / BAMBARI: Coordonnateur IDA / D1800 Project Management A posteriori Individuel Open 29,434.00 0.00 Annulé 2018-10-10 2018-11-28 2018-12-19 2019-01-23 2019-07-22 régional CF-UEPNDDRR-024-CS-INDV / BAMBARI: chauffeur IDA / D1800 Project Management A posteriori Individuel Open 4,528.00 0.00 Annulé 2019-08-31 2019-10-19 2019-11-09 2019-12-14 2020-06-11 /recrutement CF-UEPNDDRR-001-CS-INDV / Bouar: Réintégration/ IDA / D1800 Project Management A posteriori Individuel Open 29,434.00 0.00 Annulé 2018-12-20 2019-02-07 2019-02-28 2019-04-04 2019-10-01 recrutement Consultant individuel CF-UEPNDDRR-07-CS-INDV / Bouar: chauffeur IDA / D1800 Project Management A posteriori Individuel Open 4,528.00 0.00 Annulé 2019-03-28 2019-05-16 2019-06-06 2019-07-11 2020-01-07 /recrutement CF-UEPNDDRR-7-CS-INDV / Bambari: chauffeur IDA / D1800 Project Management A posteriori Individuel Open 4,528.00 0.00 Annulé 2019-03-13 2019-05-01 2019-05-22 2019-06-26 2019-12-23 /recrutement CF-UEPNDDRR-031-CS-INDV / BOUAR -Suivi évaluation: IDA / D1800 Project Management A posteriori Individuel Limited 20,377.00 0.00 Annulé 2018-11-09 2018-11-14 2018-12-05 2019-01-09 2019-07-08 recrutement d'un Assistant(e) régional(e) CF-UEPNDDRR-019-CS-INDV / Comptables régionaux: IDA / D1800 Project Management A posteriori Individuel Open 11,887.00 0.00 Annulé 2018-08-10 2018-09-28 2018-10-19 2018-11-23 2019-05-22 recrutement de 02 consultants CF-UEPNDDRR-017-CS-INDV / Chauffeur: recrutement IDA / D1800 Project Management A posteriori Individuel Open 2,642.00 0.00 Annulé 2018-08-04 2018-09-22 2018-10-13 2018-11-17 2019-05-16 UEPNDDRR CF-UEPNDDRR-003-CS-INDV / IT & Base de données: IDA / D1800 Project Management A posteriori Individuel Open 15,849.00 0.00 Annulé 2018-06-27 2018-06-12 2018-08-15 2018-09-05 2018-10-10 2019-04-08 recrutement 03 Consultants régionaux Page 4 CF-UEPNDDRR-025-CS-INDV / Suivi évaluation: IDA / D1800 Project Management A posteriori Individuel Open 29,434.00 0.00 Annulé 2018-08-22 2018-08-23 2018-10-10 2018-10-31 2018-12-05 2019-06-03 recrutement d'un consultant CF-UEPNDDRR-002-CS-INDV / Coordonnateurs: IDA / D1800 Project Management A posteriori Individuel Open 34,340.00 0.00 Annulé 2018-06-20 2018-08-08 2018-08-29 2018-10-03 2019-04-01 recrutement de 03 Consultants regionaux CF-UEPNDDRR-188913-CS- INDV / Expert Logistique en Social and Economic IDA / D1800 A posteriori Individuel Limited 5,000.00 2,169.84 Signé 2020-08-17 2020-08-11 2020-08-22 2020-08-14 2020-09-12 2020-09-01 2020-10-17 2020-09-03 2021-04-15 Appui à l'Expert Logistique de Reintegration Support l'UEPNDDRR CF-UEPNDDRR-189675-CS- CDS / OIM, Appui à la réinsertion et à la Sélection de Social and Economic Réintégration des 300 Ex IDA / D1800 A priori consultants par Direct 1,050,000.00 1,050,000.00 Signé 2020-08-24 2020-08-24 2020-09-03 2020-08-24 2020-11-07 2020-09-01 2021-05-06 Reintegration Support combattants dans la entente directe Préfecture de Bamingui Bangoran CF-UEPNDDRR-202529-CS- CDS / Appui d'un Consultant Expert Logistique pour le Suivi Sélection de de la mise en œuvre des Social and Economic IDA / D1800 A posteriori consultants par Direct 3,333.00 32,293.80 Signé 2020-11-09 2020-11-06 2020-11-19 2020-11-10 2021-01-23 2020-11-11 2021-07-22 recommandations relatives à Reintegration Support entente directe la Gestion des Immobilisations de l'UEPNDDRR CF-UEPNDDRR-145454-CS- INDV / Chargé de Social and Economic IDA / D1800 A posteriori Individuel Open 27,857.00 0.00 Annulé 2019-05-20 2019-04-09 2019-07-08 2019-07-29 2019-09-02 2020-02-29 Communication pour Reintegration Support l'UEPNDDRR de Bangui CF-UEPNDDRR-213045-CS- Sélection de CDS / Coordonnateur régional IDA / D1800 Project Management A posteriori consultants par Direct 28,364.00 28,804.78 Signé 2021-01-12 2021-01-19 2021-01-22 2021-01-19 2021-03-28 2021-01-21 2021-09-24 de l'UEPNDDRR de Paoua. entente directe CF-UEPNDDRR-112363-CS- INDV / Chargé de IDA / D1800 Project Management A posteriori Individuel Direct 32,143.00 0.00 Annulé 2018-12-14 2018-12-24 2019-01-14 2019-02-18 2019-08-17 l'Administration et des Ressources Humaines CF-UEPNDDRR-005-CS-INDV / Communicaion reg.: IDA / D1800 Project Management A posteriori Individuel Open 15,849.00 0.00 Annulé 2018-06-28 2018-06-12 2018-08-16 2018-09-06 2018-10-11 2019-04-09 Recruement d'1 Consultant CF-UEPNDDRR-112362-CS- IDA / D1800 Project Management A posteriori Individuel Open 27,857.14 0.00 Annulé 2019-04-09 2019-04-09 2019-05-28 2019-06-18 2019-07-23 2020-01-19 INDV / Chargé de Logistique CF-UEPNDDRR-02-CS-CDS / Sélection de BOUAR: Coordonnateur IDA / D1800 Project Management A priori consultants par Direct 15,600.00 0.00 Annulé 2018-07-27 2018-08-06 2018-11-02 2019-05-01 régional entente directe CF-UEPNDDRR-006-CS-INDV / Sauvegarde locale: Recrutement d'un Consultant IDA / D1800 Project Management A posteriori Individuel Direct 17,170.00 0.00 Annulé 2018-08-20 2018-08-30 2018-09-20 2018-10-25 2019-04-23 en mesures (environnementales et sociales) pour l'UEPNDDRR CF-UEPNDDRR-030-CS-INDV / Administration: recrutement IDA / D1800 Project Management A posteriori Individuel Limited 20,377.00 0.00 Annulé 2018-11-09 2018-11-14 2018-12-05 2019-01-09 2019-07-08 assistant régional à Bouar CF-UEPNDDRR-211580-CS- INDV / Assistant IDA / D1800 Project Management A posteriori Individuel Limited 13,091.00 0.00 Annulé 2020-12-28 2021-01-02 2021-01-23 2021-02-27 2021-08-26 Communication UEPNDDRR Bouar CF-UEPNDDRR-211582-CS- INDV / Assistant IDA / D1800 Project Management A posteriori Individuel Limited 13,091.00 0.00 Annulé 2020-12-28 2021-01-02 2021-01-23 2021-02-27 2021-08-26 Communication de l'UEPNDDRR de Paoua CF-UEPNDDRR-165551-CS- INDV / Expert International pour une mission d’appui à Social and Economic IDA / D1800 A posteriori Individuel Limited 30,000.00 0.00 Annulé 2020-02-01 2020-05-01 2020-02-06 2020-02-27 2020-04-02 2020-09-29 l’Équipe de Communication Reintegration Support de l’UEPNDDRR en République Centrafricaine CF-UEPNDDRR-145479-CS- Social and Economic IDA / D1800 A posteriori Individuel Open 27,857.00 0.00 Annulé 2018-11-15 2019-01-03 2019-01-24 2019-02-28 2019-08-27 INDV / Coordonnateur Bouar Reintegration Support CF-UEPNDDRR-213042-CS- Sélection de CDS / Chargé de la Logistique IDA / D1800 Project Management A posteriori consultants par 28,364.00 28,490.90 Signé 2021-02-05 2021-02-03 2021-02-15 2021-02-03 2021-04-21 2021-02-05 2021-10-18 de l'UEPNDDRR entente directe CF-UEPNDDRR-213039-CS- CDS / Chargé de la Sélection de Réintégration, de Mesures de IDA / D1800 Project Management A posteriori consultants par Direct 41,455.00 41,640.55 Signé 2021-02-05 2021-02-03 2021-02-15 2021-02-03 2021-04-21 2021-02-05 2021-10-18 Sauvegarde et du Suivi entente directe Évaluation. CF-UEPNDDRR-213041-CS- Sélection de CDS / Assistant Chargé du IDA / D1800 Project Management A posteriori consultants par Direct 21,818.00 21,916.08 Signé 2021-02-05 2021-02-03 2021-02-15 2021-02-03 2021-04-21 2021-02-05 2021-10-18 Suivi Évaluation de entente directe l'UEPNDDRR CF-UEPNDDRR-213044-CS- Sélection de CDS / Assistant Logistique de IDA / D1800 Project Management A posteriori consultants par Direct 21,818.00 21,916.08 Signé 2021-02-05 2021-02-03 2021-02-15 2021-02-03 2021-04-21 2021-02-05 2021-10-18 l'UERPNDDRR. entente directe Page 5 CF-UEPNDDRR-230733-CS- CDS / Partenaire d'Exécution (OIM) pour la mise en œuvre de la composante1 "Appui à la Réintégration Sociale et Sélection de Social and Economic En attente Économique des Ex- IDA / D1800 A priori consultants par Direct 3,811,500.00 0.00 2021-04-26 2021-05-06 2021-07-10 2022-01-06 Reintegration Support d'exécution combattants" et de la entente directe composante 2 "Appui aux individus à risque/vulnérables et aux Communautés" à Bria, Kaga-Bandoro, et Bangui CF-UEPNDDRR-230738-CS- CDS / Partenaire d'Exécution (ACTED) pour la mise en œuvre de la composante1 "Appui à la Réintégration Sélection de Social and Economic En attente Sociale et Économique des Ex- IDA / D1800 A priori consultants par Direct 1,277,500.00 0.00 2021-04-26 2021-05-06 2021-07-10 2022-01-06 Reintegration Support d'exécution combattants" et de la entente directe composante 2 "Appui aux individus à risque/vulnérables et aux Communautés" à Birao en RCA. Page 6