INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Report No.: ISDSA7322 Public Disclosure Copy Date ISDS Prepared/Updated: 19-Feb-2014 Date ISDS Approved/Disclosed: 24-Feb-2014 I. BASIC INFORMATION 1. Basic Project Data Country: Panama Project ID: P145621 Project Name: Sustainable Production Systems and Conservation of Biodiversity (P145621) Task Team Teresa M. Roncal Leader: Estimated 31-Mar-2014 Estimated 28-Feb-2014 Appraisal Date: Board Date: Managing Unit: LCSAR Lending Investment Project Financing Instrument: GEF Focal Biodiversity Area: Sector(s): General agriculture, fishing and forestry sector (70%), Public administration- Agriculture, fishing and forestry (30%) Theme(s): Biodiversity (40%), Rural non-farm income generation (20%), Micro, Small and Medium Enterprise support (20%), Participation and civi c engagement (10%), Public Disclosure Copy Decentralization (10%) Is this project processed under OP 8.50 (Emergency Recovery) or OP No 8.00 (Rapid Response to Crises and Emergencies)? Financing (In USD Million) Total Project Cost: 30.98 Total Bank Financing: 0.00 Financing Gap: 0.00 Financing Source Amount Borrower 8.16 Global Environment Facility (GEF) 9.59 Municipalities of Borrowing Country 0.10 LOCAL BENEFICIARIES 0.63 Foreign Private Commercial Sources (identified) 12.50 Total 30.98 Environmental B - Partial Assessment Category: Page 1 of 12 Is this a No Repeater Public Disclosure Copy project? 2. Global Environmental Objective(s) The proposed global environmental objective is to conserve globally significant biodiversity through improved management effectiveness of 12 project protected areas and mainstreaming, and linking to markets, biodiversity-friendly management practices in their buffer zones. 3. Project Description The project would be organized into four components: Component 1 - Sustainable Management of Protected Areas (US$16.44 million, GEF financing US $4.64 million). The objective of this component is to improve the management effectiveness and long-term sustainability of selected protected areas with a focus on financial sustainability and the monitoring of biodiversity in the selected PAs. This goal will rest on three interdependent pillars: (a) Alliances for participatory management. The proposed project would support ANAM to develop a mechanism to expedite the granting of concessions for administration and services, and will pilot implementation of these concessions, as well as co-management agreements, and pilot payment for environmental services (PES) schemes in the project area. (b) Biodiversity monitoring. A baseline for biodiversity information will be generated for selected PAs and will be monitored annually to make available reliable scientific information for decision-making and for substantiating financing from partners and sponsors. As part of the support to the SNIMDB, biological information will be collected for at least eight PAs. (c) Endowment fund for financial sustainability. A financial and governance mechanism to finance NPAS’s management costs sustainably will be established by ANAM through the newly created public-private foundation, Fundación de Áreas Protegidas y Corredores Biológicos. A total of US$1.5 million from GEF will be allocated as a seed endowment fund. The fund is expected to be Public Disclosure Copy matched immediately by approximately an additional US$3.5 million from private sector sources already identified. It is expected that once the institutional arrangements are in place, several donors and the government will provide additional funding to gradually reach a sustainable level of resources. Component 2 - Biodiversity and Sustainable Productive Landscapes (US$6.91 million, GEF financing US$3.28 million). This component focuses on activities to mainstream biodiversity and sustainable production landscapes in production areas in the buffer zones of selected PAs. It focuses on three areas of intervention: (a) Funding of biodiversity-friendly production systems. Building on the experience of the previous project, the component will support producer groups or producer associations that live outside PAs and that have implemented successful subprojects with financing from CBMAP II, to scale up their operations and implement biodiversity-friendly production and management practices with a focus on gaining or increasing access to markets for their products so that biodiversity- friendly practices become economically sustainable. Subprojects to be developed may include adoption of practices for biodiversity-friendly and climate-smart production in agro-forestry and nature-tourism activities. A detailed list of potential activities will be incorporated in the Project’s Operational Manual. Subproject grants would range from US$50,000 to 100,000 for which producer organizations, communities and municipalities will contribute at least 10 percent (in cash or in kind) of total subproject cost. Page 2 of 12 (b) Technical assistance and training for strengthening producers’ groups and associations. The component will finance training and technical advice to producer groups and associations. A training strategy will be developed by ANAM to include capacity building activities to improve technical and Public Disclosure Copy business management skills of producers, and marketing strategies, and customized training to indigenous communities in their native language. (c) Support to municipalities for implementation of municipal environmental subprojects. Several environmental municipal plans were developed under CBMAP II. The proposed project would provide funding for priority activities of those plans through a matching grant scheme. Component 3 - Knowledge Management and Communications (US$5.20 million, GEF financing US $1.20 million). This component will support the development and implementation of a communication and outreach strategy for dissemination of information, promotion of partnerships, and awareness and fund raising. It will educate consumers about the benefits of consumption of biodiversity-friendly products for their health and their environment, and the economic value of biodiversity. It will also support the foundation fund raising campaigns. It will focus on the following three areas: (a) Knowledge management. Activities include (i) capacity-building activities with key project stakeholders of both genders (e.g., producers, indigenous peoples, local government, and private sector) on good practices and knowledge management at local and regional levels to support biodiversity mainstreaming; (ii) training and professional certification of park guards by a university; (iii) strengthening of the capacity of the recently established economic unit in ANAM to lead the authority’s efforts to carry out environmental economic analysis that could demonstrate clearly the economic value of biodiversity to decision and policy makers in Panama; (iv) dissemination and promotion of PAs biodiversity information, and (v) fund raising campaign and transparency of the use of funds. (b) South-South cooperation and promotion of partnerships. ANAM will work together with the National Commission for the Knowledge and Use of Biodiversity (CONABIO) in Mexico on the implementation of a regional program for training and technology transfer related to sustainable production, and the development of biodiversity standards and/or market labels, and certification. Public Disclosure Copy Exchanges will be promoted with other trust funds (FIDECO, Chagres and Darien, managed by Fundación NATURA) within Panama, and with other countries like Peru and Mexico. On private reserves, a cooperation agreement with Nicaragua will be developed to learn from their experience on private reserves and connectivity biological corridors. (c) Strategic communication and outreach. Communications and educational campaigns will be developed and implemented, including information and communication technologies, printed materials, conferences, products exhibits, and mass media publicity to raise awareness among citizens, business people, and producers to influence production and consumption of bio-labeled goods and to promote fund raising and contributions from private companies, donors, government agencies, projects and citizens. Component 4 - Project Management (US$2.43 million, GEF financing US$0.47 million). This component will support the technical and administrative coordination of the project to ensure efficient implementation of the proposed project. Consulting services, office equipment, and operational costs for activities to be undertaken by the Project Implementing Unit (PIU) for project management, supervision, monitoring and evaluation will be financed. The project implementation period will be five years. The Recipient will be the Republic of Panama represented by the Ministry of Economy and Finance (MEF), and the implementing agency will be Page 3 of 12 ANAM, in particular the Department of Protected Areas and Wildlife (DAPVS), in charge of the NPAS. 4. Project location and salient physical characteristics relevant to the safeguard Public Disclosure Copy analysis (if known) The proposed project will be implemented in twelve protected areas (PA) and respective buffer zones geographically located in the Atlantic and central-eastern part of the country within the Panamanian MBC. Ten of these twelve PAs correspond to the ones that have been supported under the CBMAP II, and two are new. Project activities will take place in seven provinces: Bocas del Toro, Coclé, Colón, Chiriquí, Los Santos, Panamá and Veraguas; two comarcas: Guna Yala and Ngäbe-Buglé; and two indigenous peoples territories: Bribri and Naso-Teribe. Environmental and socio-economic criteria were applied in targeting these areas. 5. Environmental and Social Safeguards Specialists Mary Lisbeth Gonzalez (LCSSO) Abdelaziz Lagnaoui (LCSEN) 6. Safeguard Policies Triggered? Explanation (Optional) Environmental Assessment OP/ Yes The proposed project is expected to generate BP 4.01 overall positive environmental impacts given its objective to mainstream biodiversity management into commercially viable production systems in buffer zones and to promote participatory management of Panama’s protectedareas. OP/BP 4.01 is triggered and the project has been categorized as B, requiring a partial assessment considering the social and Environmental context of the interventions. As specific sites and exact activities are not known at this stage, an Public Disclosure Copy environmental and social management framework (ESMF) was prepared to screen, assess, and mitigate environmental impacts related to proposed subprojects that may involve investments in productive activities and construction or rehabilitation of small infrastructure. The ESMF outlines the process to prepare the necessary Environmental and social safeguards instruments for each investment activity that may be required to mitigate and manage potential environmental impacts. The ESMF also provides specific guidelines to avoid or minimize risks and manage potential environmental impacts. Any subprojects considered as Category A will not be eligible for funding by the project. Natural Habitats OP/BP 4.04 Yes The proposed project is on protected areas, including their buffer zones or influence areas, which are all important critical natural habitats Page 4 of 12 within high priority ecosystems in Panama. The project activities will promote environmentally sound agricultural practices in Public Disclosure Copy protected areas, which may include payment for environmental services, and other innovative ideas to protect environmentally sensitive habitats. Human activity in the buffer zones induced by the project may indirectly impact natural habitats. But the project will not finance any activity that could potentially cause significant conversion or degradation of natural habitats. The ESMF outlines the procedures and mechanisms for screening out activities that may cause degradation or contemplate any significant conversion of natural habitats. The ESMF also includes criteria and procedures to avoid and minimize these risks and manage potential negative impacts on natural habitat. The ESMF includes provisions to assess possible impacts prior to any actions being undertaken on the ground. Monitoring activities will be established during implementation to ensure that critical natural habitats are not adversely affected. Forests OP/BP 4.36 Yes The proposed project will be developed in natural forest areas of importance for biodiversity. Yet it is too early to know at this stage whether interventions could affect the rights and welfare Public Disclosure Copy of people dependent on forests and if this would bring changes in the management, protection, and utilization of natural forests. OP/BP 4.36 is triggered as a precautionary measure, and also to improve forest conservation. Pest Management OP 4.09 Yes The work on a production system may involve pest management and the use of agro-chemicals in subproject activities. The ESMF includes screening procedures for pest management and pesticide use. A Pest Management Plan will be prepared for subprojects likely to procure pesticides or envisage changes in pest management practices. The ESMF adequately describes the risks associated with pesticide use and the proposed measures for managing these risks. Physical Cultural Resources OP/ Yes The policy on Physical Cultural Resources (OP BP 4.11 4.11) applies given the uncertainty regarding the exact locations of activities to be carried out Page 5 of 12 under the project. Some forests or landscapes concerned by the project might be considered to have historical or cultural significance such as Public Disclosure Copy spirit forests, sacred valleys or other features of the natural landscape. The ESMF includes specific provisions to assess the potential impacts on forests, sacred valleys or landscapes considered to have historical or cultural significance prior to any activities being undertaken on the ground. The ESMF also includes provisions for the treatment of physical cultural resources that may be discovered during project implementation (chance finds). Indigenous Peoples OP/BP 4.10 Yes A Social Assessment (SA) was carried out and will be updated during the life of the Project to gather the cultural characteristics and socio- economic profile of the wide-range of stakeholders. The objective was to help design and implement differentiated mechanisms and services to meet the specific characteristics of different local contexts and beneficiaries by ethnic and socioeconomic groups. Grievance redress mechanism and conflict resolution strategies were included. An Indigenous Peoples Plan (IPP) was prepared to ensure that indigenous peoples are informed and consulted and their participation is Public Disclosure Copy encouraged and promoted during the life of the project. The project builds upon the experience of CBMAP-II. It continued working with indigenous authorities to ensure that Congress and governance structures are respected, consulted and have the opportunity to actively participate in the decision-making process that might concern or affect their interests. Action Plan details activities to ensure that IP of both genders will have access to the economic benefits of the Project. This operation promoted culturally adequate, free, prior, and informed consultations with indigenous peoples. The CBMAP-II has successfully engaged indigenous peoples Congresses and authorities in the identification, preparation and implementation of subprojects, with their broad participation in biodiversity conservation. The Project build up on Page 6 of 12 the lessons learned from CBMAP-II and other projects to improve indigenous peoples’ participation and it also improved the consultation Public Disclosure Copy mechanisms to obtain broad community support. Based on the experience of the previous projects, this operation will have a detailed communication strategy to ensure that indigenous peoples, mainly those who are monolingual are well-informed and consulted about the objectives and activities of the project, and benefit from its development objective. The ultimate objective of the communication strategy is to ensure indigenous peoples and stakeholders engagement project took into account the following principles: (a) cultural heritage and identity as assets; (b) free, prior and informed consultation and participation process; (c) community-driven development; (d) land assessment and biodiversity conservation; (e) indigenous peoples’ knowledge in natural resources management; (f) environmental issues and indigenous peoples views on climate change; (g) access to markets; and (h) gender equality particularly promoting participation of women in subprojects, strategic alliances and in community- based innovation processes. This later issue will be supported by the preparation of an action plan, as part of the IPDP that will specify clear mechanisms to promote the inclusion of women Public Disclosure Copy and youth. The IPDP also identified specific actions to support and mainstream biodiversity and sustainable production in production units of the buffer zones of selected PAs seeking to balance peoples’ livelihood with conservation. This component will enable producers to implement management systems to improve profitability while addressing sustainability challenges and biodiversity conservation. Involuntary Resettlement OP/BP Yes A Process Framework (PF) was prepared to 4.12 ensure that procedures are in place to mitigate any potential restrictions in access to protected areas and ensure consultations with potential beneficiaries on resource management activities in and around protected areas as part of the management plans. The PF identified a clear protocol to ensure that activities supported by the project within indigenous territories have broad Page 7 of 12 participation and consultation and will not incur in any type of restriction of access to resources. Public Disclosure Copy One of the main lessons learned from CBMAP-II is the integration of biodiversity conservation and livelihoods with local governance. The CBMAP- II worked to harmonize social issues with biodiversity conservation. The goal is to achieve a better integration of rural communities— including indigenous peoples and peasants—to harmonize people’s livelihoods, biodiversity conservation and local governance to develop more sustainable conservation practices, including agriculture that will facilitate access to markets for the producers. This operation is not supporting the expansion of protected areas or expropriation of land for productive projects. Safety of Dams OP/BP 4.37 No This policy is not triggered as the project will not support the construction or rehabilitation of dams nor will it support other investments which rely on the services of existing dams. Projects on International No This policy is not triggered as any subproject Waterways OP/BP 7.50 activities that may affect International Waterways will not be eligible. Projects in Disputed Areas OP/BP No This policy is not triggered as there will be no Public Disclosure Copy 7.60 subprojects in disputed areas. II. Key Safeguard Policy Issues and Their Management A. Summary of Key Safeguard Issues 1. Describe any safeguard issues and impacts associated with the proposed project. Identify and describe any potential large scale, significant and/or irreversible impacts: The proposed project builds on the experience and lessons learned from the CBMAP I and II. This, combined with the activities under the proposed project, should have a strong overall positive environmental impact and advance global biodiversity goals by (i) strengthening management of Protected Areas and natural habitats and (ii) fostering environmentally sustainable productive activities in rural areas that encourage preservation of natural resources. Potential negative environmental impacts from productive activities and small public works are expected to be minimal and are adequately addressed through a solid identification, evaluation, and mitigation framework. No potential large scale, significant and/or irreversible impacts are expected. Considering the minimal environmental impacts, the project was assigned a category B requiring a partial assessment. 2. Describe any potential indirect and/or long term impacts due to anticipated future activities in the project area: Page 8 of 12 Considering the nature of the activities proposed by the project, no potential and/or indirect impacts are anticipated in the project area. 3. Describe any project alternatives (if relevant) considered to help avoid or minimize adverse Public Disclosure Copy impacts. Since the proposed project activities relate to conservation, they should have a strong overall positive environmental impact and advance global biodiversity goals, no alternatives were contemplated. 4. Describe measures taken by the borrower to address safeguard policy issues. Provide an assessment of borrower capacity to plan and implement the measures described. The preparation of safeguard-related instruments adopted a phased approach. As specific sites and exact activities are not known at this stage, an environmental and social management framework (ESMF as Volume 1) was prepared to screen, assess environmental and social impacts related to the proposed project. The ESMF outlines the process to prepare the necessary environmental and social safeguards instruments for each investment activity. An environmental management framework (EMF as Volume 2) was prepared to provide specific guidelines to avoid or minimize risks and to assess and manage potential environmental impacts associated with subproject activities. An Indigenous Peoples Plan (IPP as Volume 3) was prepared to ensure that indigenous peoples have been informed and consulted and their participation has been encouraged and promoted during the life of the project. A Process Framework (PF as Volume 4) was prepared to ensure that procedures are in place to mitigate any potential restrictions in access to protected areas and ensure consultations with potential beneficiaries on resource management activities in and around protected areas as part of the management plans. Preparation of these instruments has been done in close collaboration with the respective Bank’s specialists; have been adequately consulted, duly reviewed and cleared for disclosure. ANAM, as implementing agency, has gained experience addressing social and environmental safeguard issues, most recently in the Rural Productivity Project (Loan 7439-PA), which is being implemented partially blended with a GEF Project for Rural Productivity and Consolidation of the Public Disclosure Copy Atlantic Mesoamerican Biological Project (TF056628). The Project has a social specialist and an environmental specialist. These projects were successful in developing organizational, administrative and technical capacity in rural and indigenous communities in extreme poverty. Both projects complied with all social and environmental safeguards policies in a satisfactory manner. While the national team has a good grasp of safeguard policies and their respective disciplines, there is a need for training on social and environmental issues at the various implementation sites. The Bank´s respective specialists will facilitate the delivery and monitoring of these training activities. 5. Identify the key stakeholders and describe the mechanisms for consultation and disclosure on safeguard policies, with an emphasis on potentially affected people. During the process of preparing the Environmental and Social Safeguards documents, public Consultation workshops were conducted with community leaders, representatives of civil society, field staff of CBMAP and ANAM in the regions of Kuna Yala, Campana National Park, Azuero Peninsula , Santiago , Cocle , Chiriquí, Ngöbe Buglé and Bocas del Toro. The workshops were held in Rio Hato CEDESAM (Cocle ) , in the City of Santiago ( Veraguas) and the City of David ( Chiriquí). Using a participatory methodology, participants assessed the current environmental situation in the areas of interventions of the proposed project and the priorities of the new project intervention within the framework of national environmental policies and social and environmental safeguards of the World Bank. Page 9 of 12 In the case of the Environmental Management Framework, preparation work included extensive consultations with community leaders from all geographic areas of the project, with experts in the field of environmental conservation and sustainable development. In all consultations, participants Public Disclosure Copy identified the lack of management capacity of local and national efforts to safeguard ecosystems and the goods and services provided by authorities. B. Disclosure Requirements Environmental Assessment/Audit/Management Plan/Other Date of receipt by the Bank 07-Dec-2013 Date of submission to InfoShop 14-Jan-2014 For category A projects, date of distributing the Executive Summary of the EA to the Executive Directors "In country" Disclosure Panama 06-Dec-2013 Comments: Resettlement Action Plan/Framework/Policy Process Date of receipt by the Bank 05-Dec-2013 Date of submission to InfoShop 14-Jan-2014 "In country" Disclosure Panama 06-Dec-2013 Comments: Indigenous Peoples Development Plan/Framework Date of receipt by the Bank 10-Dec-2013 Date of submission to InfoShop 14-Jan-2014 "In country" Disclosure Public Disclosure Copy Panama 18-Dec-2013 Comments: Pest Management Plan Was the document disclosed prior to appraisal? NA Date of receipt by the Bank NA Date of submission to InfoShop NA "In country" Disclosure Comments: If the project triggers the Pest Management and/or Physical Cultural Resources policies, the respective issues are to be addressed and disclosed as part of the Environmental Assessment/ Audit/or EMP. If in-country disclosure of any of the above documents is not expected, please explain why: N/A C. Compliance Monitoring Indicators at the Corporate Level OP/BP/GP 4.01 - Environment Assessment Page 10 of 12 Does the project require a stand-alone EA (including EMP) Yes [ ] No [ ] NA [ ] report? Public Disclosure Copy If yes, then did the Regional Environment Unit or Sector Yes [ ] No [ ] NA [ ] Manager (SM) review and approve the EA report? Are the cost and the accountabilities for the EMP incorporated Yes [ ] No [ ] NA [ ] in the credit/loan? OP/BP 4.04 - Natural Habitats Would the project result in any significant conversion or Yes [ ] No [ ] NA [ ] degradation of critical natural habitats? If the project would result in significant conversion or Yes [ ] No [ ] NA [ ] degradation of other (non-critical) natural habitats, does the project include mitigation measures acceptable to the Bank? OP 4.09 - Pest Management Does the EA adequately address the pest management issues? Yes [ ] No [ ] NA [ ] Is a separate PMP required? Yes [ ] No [ ] NA [ ] If yes, has the PMP been reviewed and approved by a Yes [ ] No [ ] NA [ ] safeguards specialist or SM? Are PMP requirements included in project design?If yes, does the project team include a Pest Management Specialist? OP/BP 4.11 - Physical Cultural Resources Does the EA include adequate measures related to cultural Yes [ ] No [ ] NA [ ] property? Does the credit/loan incorporate mechanisms to mitigate the Yes [ ] No [ ] NA [ ] potential adverse impacts on cultural property? Public Disclosure Copy OP/BP 4.10 - Indigenous Peoples Has a separate Indigenous Peoples Plan/Planning Framework Yes [ ] No [ ] NA [ ] (as appropriate) been prepared in consultation with affected Indigenous Peoples? If yes, then did the Regional unit responsible for safeguards or Yes [ ] No [ ] NA [ ] Sector Manager review the plan? If the whole project is designed to benefit IP, has the design Yes [ ] No [ ] NA [ ] been reviewed and approved by the Regional Social Development Unit or Sector Manager? OP/BP 4.12 - Involuntary Resettlement Has a resettlement plan/abbreviated plan/policy framework/ Yes [ ] No [ ] NA [ ] process framework (as appropriate) been prepared? If yes, then did the Regional unit responsible for safeguards or Yes [ ] No [ ] NA [ ] Sector Manager review the plan? OP/BP 4.36 - Forests Has the sector-wide analysis of policy and institutional issues Yes [ ] No [ ] NA [ ] and constraints been carried out? Page 11 of 12 Does the project design include satisfactory measures to Yes [ ] No [ ] NA [ ] overcome these constraints? Public Disclosure Copy Does the project finance commercial harvesting, and if so, Yes [ ] No [ ] NA [ ] does it include provisions for certification system? The World Bank Policy on Disclosure of Information Have relevant safeguard policies documents been sent to the Yes [ ] No [ ] NA [ ] World Bank's Infoshop? Have relevant documents been disclosed in-country in a public Yes [ ] No [ ] NA [ ] place in a form and language that are understandable and accessible to project-affected groups and local NGOs? All Safeguard Policies Have satisfactory calendar, budget and clear institutional Yes [ ] No [ ] NA [ ] responsibilities been prepared for the implementation of measures related to safeguard policies? Have costs related to safeguard policy measures been included Yes [ ] No [ ] NA [ ] in the project cost? Does the Monitoring and Evaluation system of the project Yes [ ] No [ ] NA [ ] include the monitoring of safeguard impacts and measures related to safeguard policies? Have satisfactory implementation arrangements been agreed Yes [ ] No [ ] NA [ ] with the borrower and the same been adequately reflected in the project legal documents? III. APPROVALS Task Team Leader: Name: Teresa M. Roncal Public Disclosure Copy Approved By Sector Manager: Name: Laurent Msellati (SM) Date: 24-Feb-2014 Page 12 of 12