Uganda - Additional Financing for the Second Energy for Rural Transformation Adaptable Program Loan Project : Environmental assessment for the 33kv power distribution line for ruhiira millennium village rural electrification project and associated low voltage networks (English)

Abstract

The objective of the Second Energy for Rural Transformation Project for Uganda is to provide electricity to rural areas in parts of Western Uganda which have hitherto not been on the grid. The affected districts are Masindi, Buliisa, Hoima, Ibanda, Kiruhura... See More +

Details

  • 2013/03/19
  • Environmental Assessment
  • E4170
  • 1
  • 4 (See all volumes)
  • Uganda
  • Africa
  • 2013/03/25
  • Disclosed
  • Environmental assessment for the 33kv power distribution line for ruhiira millennium village rural electrification project and associated low voltage networks
See More +

Downloads

Complete Report in English

Official version of document (may contain signatures, etc)

*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation