Sustainable Family Farming Modernization Project (P151963) Procurement Plan Country: Ecuador Region: LATIN AMERICA AND CARIBBEAN Approval Date: 5-May-2015 (original). General Procurement Notice published on: 4-March-2016 July 9, 2010 PROCUREMENT Ecuador : Ecuador - Sustainable Family Farming Modernization Project PLAN General Information Country: Ecuador Bank’s Approval Date of the Original Procurement Plan: 2017-03- 02 2020-11- Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151963 GPN Date: 23 Project Name: Ecuador - Sustainable Family Farming Modernization Project Loan / Credit No: IBRD / 85150, COFN / C1410 Ministry of Agriculture,Livestock, Aquaculture and Fisheries Executing Agency(ies): WORKS Activity Reference No. / Procurement Estimated Actual Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalificatio High SEA/SH Process Prequalification Specific Procurement Bidding Documents Proposal Submission Contract Description Component Review Type Method Document Amount Amount qualification Document / and Signed Contract No. Approach Process n (Y/N) Risk Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Completion Type (US$) (US$) Documents Justification Recommendation for Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PlannedAwardActual Planned Actual Planned EC-MAGAP-8176-027 / Component 1: Investments Solicitud de Single Stage - One 287,876.4 2016-10- 2017-03- 2016-11- 2016-12- 2017-04- 2017-02- 2017-05- 2017-04- 2017-06- 2017-07- Asociación de Productores IBRD / 85150 for climate-smart sub- Posterior Open - National 253,597.88 Finalizado ofertas Envelope 4 31 29 18 19 27 07 11 01 27 31 Agrícolas San Rafael projects EC-MAGAP-8176-029 / Component 1: Investments Solicitud de Single Stage - One 247,158.5 2016-10- 2016-11- 2016-11- 2016-12- 2016-12- 2017-02- 2017-02- 2017-03- 2017-04- 2017-06- Cooperativa Agropecuaria IBRD / 85150 for climate-smart sub- Posterior Open - National 240,663.07 Finalizado ofertas Envelope 8 31 15 18 19 19 02 20 04 28 30 el Marco, Pintag projects EC-MAGAP-8176-030 / Component 1: Investments Solicitud de Single Stage - One 160,946.5 2016-11- 2016-11- 2016-11- 2016-12- 2016-12- 2017-02- 2017-03- 2017-03- 2017-04- 2017-06- Asociación Campesina 15 IBRD / 85150 for climate-smart sub- Posterior Open - National 151,237.97 Finalizado ofertas Envelope 7 11 24 25 23 23 02 14 25 12 30 de Diciembre, Campozano projects EC-MAGAP-8176-031 / Component 1: Investments Solicitud de Single Stage - One 352,483.5 2016-12- 2016-12- 2017-01- 2017-02- 2017-02- 2017-02- 2017-03- 2017-03- 2017-07- Directorio de Agua del IBRD / 85150 for climate-smart sub- Posterior Open - National 282,495.04 Finalizado ofertas Envelope 0 02 16 16 23 08 23 31 24 31 canal Palo Marcado projects EC-MAGAP-8176-032 / Component 1: Investments Solicitud de Single Stage - One 283,055.8 2016-12- 2017-03- 2016-12- 2017-01- 2017-04- 2017-02- 2017-05- 2017-03- 2017-07- 2017-06- Inversión - Asociación IBRD / 85150 for climate-smart sub- Posterior Open - National 288,011.72 Finalizado ofertas Envelope 8 20 22 30 30 28 13 19 31 19 30 Santa Cecilia de Pucalpa projects EC-MAGAP-8176-033 / Inversión - Asociación de Component 1: Investments trabajadores agrícolas, Solicitud de Single Stage - One 769,439.8 2016-12- 2016-12- 2017-01- 2017-01- 2017-02- 2017-02- 2017-03- 2017-03- 2017-08- IBRD / 85150 for climate-smart sub- Posterior Open - National 537,557.30 Firmado autónomos comerciantes, ofertas Envelope 1 20 30 30 30 13 22 15 27 31 projects exportadores “Voluntad de Dios" EC-MAGAP-8176-034 / Inversión - Asociación de Component 1: Investments Solicitud de Single Stage - One 371,209.0 2016-12- 2016-12- 2016-12- 2017-01- 2017-01- 2017-02- 2017-02- 2017-03- 2017-04- 2017-07- desarrollo integral de la IBRD / 85150 for climate-smart sub- Posterior Open - National 387,514.99 Finalizado ofertas Envelope 0 20 30 30 30 30 13 17 15 13 31 comunidad de Cutahua, projects Simiatug EC-MAGAP-8176-036 / Component 1: Investments Solicitud de Single Stage - One 194,445.7 2016-12- 2016-12- 2016-12- 2017-01- 2017-01- 2017-02- 2017-02- 2017-05- 2017-03- 2017-06- Inversión - Junta de IBRD / 85150 for climate-smart sub- Posterior Open - National 221,582.20 Finalizado ofertas Envelope 4 02 08 16 16 16 07 23 01 27 30 Regantes del sistema de projects riego La Era EC-MAGAP-8176-045 / 1. Component 3: Project Solicitud de Single Stage - One 2016-07- 2017-01- 2016-12- 2017-02- IBRD / 85150 Posterior Open - National 66,120.00 65,477.67 Firmado Readecuación Oficinas Management cotizaciones Envelope 31 06 19 15 EC-MAGAP-8176-035 / Component 1: Investments Inversión - Tecnificacion Solicitud de Single Stage - One 174,085.2 2016-12- 2016-12- 2016-12- 2017-01- 2017-01- 2017-02- 2017-03- 2017-05- 2017-04- 2017-06- IBRD / 85150 for climate-smart sub- Posterior Open - National 163,125.09 Finalizado del sistema de riego Zhilla ofertas Envelope 2 08 21 23 23 23 06 14 01 25 30 projects San Pedro EC-MAGAP-8176-028 / Component 1: Investments Inversión en 11 Solicitud de Single Stage - One 4,779,232. 2017-06- 2017-06- 2017-07- 2017-08- 2017-09- 2018-02- IBRD / 85150 for climate-smart sub- Posterior Open - National 0.00 Cancelado subproyectos de riego ofertas Envelope 60 01 06 18 17 01 28 projects parcelario de la primera convocatoria EC-MAGAP-8176-038 / Component 1: Investments Inversión - Asociación Solicitud de Single Stage - One 2017-02- 2017-02- 2017-03- 2017-04- 2017-05- 2017-09- IBRD / 85150 for climate-smart sub- Posterior Open - National 316,415.09 0.00 Cancelado Agropecuaria Santa Clara ofertas Envelope 13 27 30 21 08 30 projects de Tolontag EC-MAGAP-8176-044 / Component 1: Investments Inversión en 2 Solicitud de Single Stage - One 1,041,398. 2017-03- 2017-03- 2017-04- 2017-05- 2017-05- 2017-12- IBRD / 85150 for climate-smart sub- Posterior Open - National 0.00 Cancelado subproyectos de ofertas Envelope 91 01 06 17 17 31 31 projects microreservorios primera convocatoria EC-MAGAP-8176-042 / Component 1: Investments Inversión - Tecnificación Solicitud de Single Stage - One 2017-02- 2017-02- 2017-03- 2017-04- 2017-05- 2017-11- IBRD / 85150 for climate-smart sub- Posterior Open - National 395,844.22 0.00 Cancelado del sistema de riego Luis ofertas Envelope 13 27 30 21 31 27 projects Cordero Etapa 1 EC-MAGAP-8176-041 / Component 1: Investments Solicitud de Single Stage - One 2017-02- 2017-02- 2017-03- 2017-04- 2017-05- 2017-08- Inversión - Tecnificacion IBRD / 85150 for climate-smart sub- Posterior Open - National 476,881.35 0.00 Cancelado ofertas Envelope 13 27 30 21 08 31 del sistema de riego projects Putucay EC-MAGAP-8176-043 / Inversiones en 34 Component 1: Investments Solicitud de Single Stage - One 2016-02- 2016-02- 2016-03- 2016-04- 2016-05- 2017-10- Microreservorios en la IBRD / 85150 for climate-smart sub- Posterior Open - National 254,281.88 0.00 Cancelado ofertas Envelope 13 27 30 21 08 31 parroquia Ingapirca-Coop. projects Vendeleche EC-MAGAP-32782-CW- Component 3: Project Solicitud de Single Stage - One 2017-11- 2017-12- 2018-01- RFQ / Implementación de IBRD / 85150 Posterior Open - National 10,000.00 0.00 Cancelado Management cotizaciones Envelope 20 09 23 espacio físico para archivo EC-MAGAP-37039-CW- RFB / Obra - Subproyecto: Component 1: Investments Implementación de riego Solicitud de Single Stage - One 2018-09- 2018-10- 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2019-04- IBRD / 85150 for climate-smart sub- Posterior Open - National 255,018.99 0.00 Cancelado tecnificado a nivel ofertas Envelope 24 08 04 16 03 18 23 22 projects parcelario del sistema de riego El Verde - Pacayunga. EC-MAGAP-36997-CW- RFB / Obra - Subproyecto: Component 1: Investments Implementación del Solicitud de Single Stage - One 2018-09- 2018-09- 2018-10- 2018-10- 2018-12- 2019-04- COFN / C1410 for climate-smart sub- Posterior Open - National 181,122.08 0.00 Cancelado sistema de riego por goteo ofertas Envelope 03 13 13 28 02 01 projects y aspersión en la Asociación "Un Paso Hacia El Progreso" (Huaquer) EC-MAGAP-37040-CW- RFB / Obra - Subproyecto: Implementación de riego Component 1: Investments Solicitud de Single Stage - One 2018-09- 2018-10- 2018-09- 2018-10- 2018-11- 2018-12- 2019-06- parcelario tecnificado por IBRD / 85150 for climate-smart sub- Posterior Open - National 515,344.07 0.00 Cancelado ofertas Envelope 17 08 27 27 11 16 14 aspersión y goteo para el projects sistema de riego "Y de El Guineo". EC-MAGAP-37050-CW- RFB / Obra - Subproyecto: Component 1: Investments Tecnificación de Riego a Solicitud de Single Stage - One 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-11- 2018-12- 2019-04- IBRD / 85150 for climate-smart sub- Posterior Open - National 304,748.40 0.00 Cancelado nivel parcelario por ofertas Envelope 10 08 20 17 20 04 09 08 projects aspersión para la Junta de Riego "Gúlac - Cruz Rumi". EC-MAGAP-37036-CW- Component 1: Investments Solicitud de Single Stage - One 2017-11- 2017-12- 2018-01- 2018-01- 2018-02- 2018-08- RFB / Inversión IBRD / 85150 for climate-smart sub- Posterior Open - National 451,844.13 0.00 Cancelado ofertas Envelope 24 04 03 18 22 21 Tecnificación del Sistema projects de Riego Luis Cordero EC-MAGAP-37037-CW- Component 1: Investments Solicitud de Single Stage - One 2018-05- 2018-05- 2018-06- 2018-06- 2018-07- 2018-11- RFB / Inversión - IBRD / 85150 for climate-smart sub- Posterior Open - National 343,109.13 0.00 Cancelado ofertas Envelope 01 11 10 25 30 27 Tecnificación del Sistema projects de Riego Tolontag EC-MAGAP-37025-CW- Component 1: Investments RFB / Inversión Solicitud de Single Stage - One 1,867,958. 2018-02- 2018-02- 2018-03- 2018-04- 2018-05- 2018-11- IBRD / 85150 for climate-smart sub- Posterior Open - National 0.00 Cancelado Tecnificación del Sistema ofertas Envelope 40 15 25 27 11 16 12 projects de Riego Las Mercedes EC-MAGAP-37051-CW- Component 1: Investments Solicitud de Single Stage - One 2,638,944. 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2019-07- RFB / Inversión IBRD / 85150 for climate-smart sub- Posterior Open - National 0.00 Cancelado ofertas Envelope 00 01 11 10 25 29 26 Tecnificación del Sistema projects de Riego Bolo Dolores EC-MAGAP-37044-CW- Component 1: Investments Solicitud de Single Stage - One 2018-05- 2018-05- 2018-06- 2018-06- 2018-07- 2019-01- RFB / Inversión IBRD / 85150 for climate-smart sub- Posterior Open - National 879,648.00 0.00 Cancelado ofertas Envelope 01 11 10 25 30 26 Tecnificación del Sistema projects de Riego Chambitola EC-MAGAP-37048-CW- Component 1: Investments Solicitud de Single Stage - One 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2019-01- RFB / Inversión IBRD / 85150 for climate-smart sub- Posterior Open - National 382,905.60 0.00 Cancelado ofertas Envelope 01 11 10 25 29 27 Tecnificación del Sistema projects de Riego Jesús María EC-MAGAP-37346-CW- Component 1: Investments Solicitud de Single Stage - One 2017-11- 2017-12- 2018-01- 2018-01- 2018-02- 2018-06- RFB / Inversión IBRD / 85150 for climate-smart sub- Posterior Open - National 538,457.85 0.00 Cancelado ofertas Envelope 24 04 03 18 22 22 Tecnificación del Sistema projects de Riego Putucay EC-MAGAP-37030-CW- RFB / Inversión - Component 1: Investments Solicitud de Single Stage - One 2017-12- 2017-12- 2018-01- 2018-01- 2018-03- 2018-11- Tecnificación del Sistema COFN / C1410 for climate-smart sub- Posterior Open - National 859,281.16 0.00 Cancelado ofertas Envelope 01 11 10 25 01 26 de Riego Directorio de projects aguas de la acequia "Mundug Yamate" EC-MAGAP-37047-CW- Component 1: Investments Solicitud de Single Stage - One 2018-02- 2018-02- 2018-03- 2018-03- 2018-05- 2018-08- RFB / Inversión IBRD / 85150 for climate-smart sub- Posterior Open - National 486,393.60 0.00 Cancelado ofertas Envelope 01 11 13 28 02 30 Tecnificación del Sistema projects de Riego La Belgica EC-MAGAP-37053-CW- Component 1: Investments Solicitud de Single Stage - One 1,034,880. 2018-06- 2018-06- 2018-07- 2018-07- 2018-08- 2019-02- RFB / Inversión IBRD / 85150 for climate-smart sub- Posterior Open - National 0.00 Cancelado ofertas Envelope 00 01 11 11 26 30 26 Tecnificación del Sistema projects de Riego Zhinzhon EC-MAGAP-37043-CW- Component 1: Investments Solicitud de Single Stage - One 2018-08- 2018-08- 2018-09- 2018-09- 2018-10- 2019-02- RFB / Inversión IBRD / 85150 for climate-smart sub- Posterior Open - National 289,766.40 0.00 Cancelado ofertas Envelope 01 11 10 25 30 27 Tecnificación del Sistema projects de Riego Milagro EC-MAGAP-37026-CW- RFB / Obra - Subproyecto: Component 1: Investments Solicitud de Single Stage - One 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-10- 2018-12- 2019-05- Implementación del IBRD / 85150 for climate-smart sub- Posterior Open - National 394,535.71 0.00 Cancelado ofertas Envelope 03 08 13 16 13 28 02 31 sistema de riego por projects aspersión en el predio "Santa Ana". EC-MAGAP-37033-CW- RFB / Obra - Subproyecto: Component 1: Investments Implementación de riego Solicitud de Single Stage - One 1,178,659. 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-10- 2018-12- 2019-08- COFN / C1410 for climate-smart sub- Posterior Open - National 0.00 Cancelado parcelario tecnificado en 15 ofertas Envelope 32 03 08 13 16 13 28 02 29 projects módulos del sistema de riego Píllaro Ramal Norte. EC-MAGAP-37029-CW- RFB / Obra - Subproyecto: Component 1: Investments Implementación del Solicitud de Single Stage - One 369,817.9 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- 2018-12- 2019-05- IBRD / 85150 for climate-smart sub- Posterior Open - National 290,247.35 Firmado sistema de riego parcelario ofertas Envelope 6 10 08 20 17 20 13 04 22 09 17 08 projects por aspersión para la "Asociación Agropecuaria Sierra Morena" EC-MAGAP-37032-CW- RFB / Obra - Subproyecto: Implementación de riego Component 1: Investments Solicitud de Single Stage - One 655,898.7 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-11- 2018-10- 2018-11- 2018-12- 2018-12- 2019-04- parcelario tecnificado, con COFN / C1410 for climate-smart sub- Posterior Open - National 806,547.88 Firmado ofertas Envelope 3 03 08 13 19 13 13 28 27 02 28 01 las familias de usuarios del projects óvalo Pinguilí de la acequia Mocha Huachi. EC-MAGAP-37028-CW- RFB / Obra - Subproyecto: Implementación del Component 1: Investments Solicitud de Single Stage - One 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-11- 2018-12- 2019-05- sistema de riego parcelario IBRD / 85150 for climate-smart sub- Posterior Open - National 266,172.40 0.00 Cancelado ofertas Envelope 10 08 20 17 20 04 09 08 por aspersión para la projects "Asociación de productores agropecuarios la Nueva Esperanza". EC-MAGAP-37034-CW- RFB / Obra - Subproyecto: Component 1: Investments Implementación de riego Solicitud de Single Stage - One 2,398,113. 2018-09- 2018-10- 2018-09- 2018-10- 2018-11- 2018-12- 2019-09- IBRD / 85150 for climate-smart sub- Posterior Open - National 0.00 Cancelado parcelario tecnificado en ofertas Envelope 10 10 08 20 20 04 09 05 projects veinte módulos del sistema de riego Píllaro Ramal Sur. EC-MAGAP-37038-CW- RFB / Obra - Subproyecto: Component 1: Investments Tecnificación de riego Solicitud de Single Stage - One 2018-09- 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2019-04- IBRD / 85150 for climate-smart sub- Posterior Open - National 767,833.70 0.00 Cancelado parcelario por micro ofertas Envelope 24 08 04 03 18 23 22 projects aspersión para la comunidad Estero Piedras. Page 1 EC-MAGAP-37041-CW- RFB / Obra - Subproyecto: Component 1: Investments Implementación de riego Solicitud de Single Stage - One 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-11- 2018-12- 2019-04- COFN / C1410 for climate-smart sub- Posterior Open - National 473,289.39 0.00 Cancelado por aspersión en la ofertas Envelope 17 08 27 17 27 11 16 15 projects Asociación Agropecuaria Manuel Freile Barba "La Magdalena". EC-MAG-74155-CW-RFB / Obra - Subproyecto: Implementación de riego Component 1: Investments Solicitud de Single Stage - One 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-11- 2018-12- 2019-07- parcelario tecnificado por COFN / C1410 for climate-smart sub- Posterior Open - National 857,261.64 0.00 Cancelado ofertas Envelope 17 08 27 16 27 11 16 21 aspersión en 152,44 ha projects para la Junta General de Riego "Canal Central Toacaso" EC-MAGAP-37042-CW- RFB / Obra - Subproyecto: Component 1: Investments Implementación del Solicitud de Single Stage - One 313,599.7 2018-09- 2018-10- 2018-09- 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- 2018-12- 2019-05- IBRD / 85150 for climate-smart sub- Posterior Open - National 345,986.16 Finalizado sistema de riego parcelario ofertas Envelope 3 17 08 27 19 27 13 11 23 16 28 15 projects por aspersión para la "Comuna Jurídica La Libertad". EC-MAG-74161-CW-RFB / Obra - Subproyecto: Component 1: Investments Solicitud de Single Stage - One 2018-09- 2018-10- 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2019-05- Implementación de riego COFN / C1410 for climate-smart sub- Posterior Open - National 448,238.83 0.00 Cancelado ofertas Envelope 24 08 04 16 03 18 23 22 parcelario tecnificado en el projects predio Sucuso EC-MAGAP-37046-CW- RFB / Obra - Subproyecto: Component 1: Investments Solicitud de Single Stage - One 1,257,417. 1,119,683 2018-09- 2018-10- 2018-09- 2018-10- 2018-11- 2018-10- 2018-12- 2018-12- 2018-12- 2019-04- Implementación del IBRD / 85150 for climate-smart sub- Posterior Open - National Finalizado ofertas Envelope 83 .44 03 19 13 13 22 28 21 02 28 01 sistema de riego por projects aspersión en el predio "La Paquita" EC-MAG-87856-CW-RFB / Obra - Subproyecto: Implementación del Component 1: Investments Solicitud de Single Stage - One 319,957.1 2018-11- 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-05- sistema de riego parcelario IBRD / 85150 for climate-smart sub- Posterior Open - National 266,172.40 Firmado ofertas Envelope 6 23 29 24 10 12 13 19 17 26 16 por aspersión para la projects "Asociación de productores agropecuarios la Nueva Esperanza". EC-MAG-87857-CW-RFB / Obra - Subproyecto: Component 1: Investments Implementación de riego Solicitud de Single Stage - One 445,759.7 2018-11- 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-04- COFN / C1410 for climate-smart sub- Posterior Open - National 473,289.39 Finalizado por aspersión en la ofertas Envelope 3 23 29 24 10 12 13 19 17 26 16 projects Asociación Agropecuaria Manuel Freile Barba "La Magdalena". EC-MAG-87859-CW-RFB / Obra - Subproyecto: Component 1: Investments Tecnificación de Riego a Solicitud de Single Stage - One En 2018-11- 2019-06- 2018-11- 2019-03- 2018-12- 2018-12- 2018-12- 2019-04- IBRD / 85150 for climate-smart sub- Posterior Open - National 304,748.40 0.00 nivel parcelario por ofertas Envelope ejecución 23 24 24 13 10 13 17 16 projects aspersión para la Junta de Riego "Gúlac - Cruz Rumi" EC-MAG-87861-CW-RFB / Obra - Subproyecto: Component 1: Investments Solicitud de Single Stage - One 349,855.7 2018-11- 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-06- Implementación del IBRD / 85150 for climate-smart sub- Posterior Open - National 394,535.71 Firmado ofertas Envelope 1 23 29 24 10 12 13 21 17 28 15 sistema de riego por projects aspersión en el predio "Santa Ana" EC-MAG-87862-CW-RFB / Obra - Subproyecto: Component 1: Investments Tecnificación de riego Solicitud de Single Stage - One 721,919.7 2018-11- 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-01- 2019-04- IBRD / 85150 for climate-smart sub- Posterior Open - National 767,833.70 Finalizado parcelario por micro ofertas Envelope 0 23 29 24 10 12 13 21 17 07 16 projects aspersión para la comunidad Estero Piedras EC-MAG-87863-CW-RFB / Obra - Subproyecto: Component 1: Investments Implementación de riego Solicitud de Single Stage - One 1,178,659. 1,112,620 2018-11- 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-02- 2019-09- COFN / C1410 for climate-smart sub- Posterior Open - National Firmado parcelario tecnificado en 15 ofertas Envelope 32 .01 23 29 24 10 12 13 21 17 15 13 projects módulos del sistema de riego Píllaro Ramal Norte EC-MAG-87864-CW-RFB / Obra - Subproyecto: Component 1: Investments Implementación de riego Solicitud de Single Stage - One 2,398,113. 2,185,774 2018-11- 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-04- 2019-09- IBRD / 85150 for climate-smart sub- Posterior Open - National Firmado parcelario tecnificado en ofertas Envelope 10 .26 23 29 24 10 12 13 21 17 04 13 projects veinte módulos del sistema de riego Píllaro Ramal Sur EC-MAG-87865-CW-RFB / Obra - Subproyecto: Implementación de riego Component 1: Investments Solicitud de Single Stage - One 401,816.4 2018-11- 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-02- 2019-06- parcelario tecnificado por IBRD / 85150 for climate-smart sub- Posterior Open - National 515,344.07 Firmado ofertas Envelope 9 23 29 24 10 12 13 28 17 15 15 aspersión y goteo para el projects sistema de riego "Y del Guineo". EC-MAG-87867-CW-RFB / Obra - Subproyecto: Component 1: Investments Implementación del Solicitud de Single Stage - One 194,925.1 2018-11- 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-04- COFN / C1410 for climate-smart sub- Posterior Open - National 181,122.08 Firmado sistema de riego por goteo ofertas Envelope 8 23 29 24 10 12 13 18 17 26 16 projects y aspersión en la Asociación "Un Paso Hacia El Progreso" (Huaquer) EC-MAG-87869-CW-RFB / Obra - Subproyecto: Component 1: Investments Implementación de riego Solicitud de Single Stage - One En 2018-11- 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2019-04- IBRD / 85150 for climate-smart sub- Posterior Open - National 255,018.99 0.00 tecnificado a nivel ofertas Envelope ejecución 23 29 24 10 13 17 16 projects parcelario del sistema de riego El Verde - Pacayunga EC-MAG-87870-CW-RFB / Obra - Subproyecto: Component 1: Investments Solicitud de Single Stage - One En 2018-11- 2019-03- 2018-11- 2019-04- 2018-12- 2018-12- 2018-12- 2019-05- Implementación de riego COFN / C1410 for climate-smart sub- Posterior Open - National 448,238.83 0.00 ofertas Envelope ejecución 23 12 24 02 10 13 17 16 parcelario tecnificado en el projects predio Sucuso EC-MAG-87871-CW-RFB / Obra - Subproyecto: Implementación de riego Component 1: Investments Solicitud de Single Stage - One 614,999.7 2018-11- 2018-11- 2018-11- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2018-12- 2019-07- parcelario tecnificado por COFN / C1410 for climate-smart sub- Posterior Open - National 857,261.64 Finalizado ofertas Envelope 6 23 29 24 10 12 13 17 17 26 22 aspersión en 152,44 ha projects para la Junta General de Riego "Canal Central Toacaso" EC-MAG-94817-CW-RFB / Obra - Subproyecto: Component 1: Investments Solicitud de Single Stage - One 1,071,772. 278,279.1 2019-07- 2019-10- 2019-07- 2019-10- 2019-08- 2019-10- 2019-09- 2019-11- 2019-09- 2019-11- 2020-02- Implementación de Riego IBRD / 85150 for climate-smart sub- Posterior Open - National Firmado ofertas Envelope 80 1 19 01 24 07 23 31 07 11 27 22 24 Tecnificado para la projects "Asociación 17 de Junio" EC-MAG-94818-CW-RFB / Obra - Subproyecto: Component 1: Investments Tecnificación de Riego Solicitud de Single Stage - One En 2019-05- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- 2019-07- 2020-01- IBRD / 85150 for climate-smart sub- Posterior Open - National 521,781.70 0.00 Parcelario por ofertas Envelope ejecución 06 16 13 21 12 27 17 13 projects Microaspersión para el Sistema de Riego Putucay EC-MAG-94819-CW-RFB / Obra - Subproyecto: Component 1: Investments Solicitud de Single Stage - One 2019-06- 2019-07- 2019-08- 2019-08- 2019-09- 2020-01- Implementación de Riego IBRD / 85150 for climate-smart sub- Posterior Open - National 433,490.87 0.00 Cancelado ofertas Envelope 28 03 02 19 10 08 Parcelario Tecnificado Luis projects Cordero EC-MAG-94899-CW-RFB / Obra - Subproyecto: Component 1: Investments Solicitud de Single Stage - One 1,816,819. En 2019-06- 2019-06- 2019-07- 2019-06- 2019-08- 2019-08- 2019-09- 2020-03- Implementación de Sistema IBRD / 85150 for climate-smart sub- Posterior Open - National 0.00 ofertas Envelope 83 ejecución 28 07 03 12 02 19 10 08 de Riego Tecnificado en el projects Predio "Las Mercedes" EC-MAG-94902-CW-RFB / Obra - Subproyecto: Component 1: Investments Implementación de Riego Solicitud de Single Stage - One En 2019-06- 2019-06- 2019-07- 2019-06- 2019-08- 2019-08- 2019-09- 2020-03- COFN / C1410 for climate-smart sub- Posterior Open - National 983,136.62 0.00 Parcelario Tecnificado con ofertas Envelope ejecución 28 07 03 12 02 19 10 08 projects las familias de usuarios de la Acequia Mundug Yamate EC-MAG-119189-CW-RFB / OBRA: IMPLEMENTACIÓN DE MICRORESERVORIOS CON RIEGO PARCELARIO Component 1: Investments Solicitud de Single Stage - One 1,054,201. En 2019-06- 2019-06- 2019-06- 2019-07- 2019-08- 2019-08- 2019-09- TECNIFICADO POR IBRD / 85150 for climate-smart sub- Posterior Open - National 0.00 ofertas Envelope 92 ejecución 14 26 19 19 02 22 03 ASPERSIÓN Y GOTEO EN LA projects "JUNTA DE AGUAS DE RIEGO DE LA ACEQUIA DEL PUEBLO DE PIMAMPIRO" EC-MAG-119195-CW-RFB / OBRA: CONSTRUCCIÓN DE MICRORESERVORIOS E IMPLEMENTACIÓN DE Component 1: Investments RIEGO PARCELARIO Solicitud de Single Stage - One En 2019-06- 2019-06- 2019-06- 2019-07- 2019-08- 2019-09- 2020-05- IBRD / 85150 for climate-smart sub- Posterior Open - National 697,836.16 0.00 TECNIFICADO PARA LA ofertas Envelope ejecución 14 13 26 26 12 03 30 projects ASOCIACIÓN DE PRODUCCIÓN CAFETALERA DEL SUR ORIENTE DE LA PROVINCIA DE LOJA "PROCAFEQ" EC-MAG-94906-CW-RFB / Obra -Subproyecto: Component 1: Investments Solicitud de Single Stage - One 194,877.4 2019-10- 2019-11- 2019-10- 2019-11- 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-12- 2020-06- Implementación de Riego COFN / C1410 for climate-smart sub- Posterior Open - National 403,200.00 Firmado ofertas Envelope 8 07 08 14 09 13 29 28 29 18 11 15 Parcelario Tecnificado projects "Campo Alegre" EC-MAG-136320-CW-RFB Component 1: Investments / Obra: Implementación de Solicitud de Single Stage - One 494,472.7 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- 2019-12- 2019-11- 2019-12- 2019-12- 2020-04- IBRD / 85150 for climate-smart sub- Posterior Open - National 380,800.00 Firmado Riego Tecnificado en el ofertas Envelope 8 07 14 22 15 21 11 05 21 24 11 22 projects Subproyecto "El Paraíso" EC-MAG-136322-CW-RFB / Obra: Implementación de Component 1: Investments Solicitud de Single Stage - One En 2019-10- 2019-11- 2019-10- 2019-11- 2019-11- 2019-12- 2019-12- 2020-04- Riego Tecnificado en el COFN / C1410 for climate-smart sub- Posterior Open - National 752,640.00 0.00 ofertas Envelope ejecución 07 15 22 18 21 05 24 22 Subproyecto "Guayama San projects Pedro" EC-MAG-136323-CW-RFB Component 1: Investments / Obra: Implementación de Solicitud de Single Stage - One 502,511.0 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- 2019-12- 2019-11- 2019-12- 2019-11- 2020-04- IBRD / 85150 for climate-smart sub- Posterior Open - National 504,000.00 Firmado Riego Tecnificado en el ofertas Envelope 4 07 14 22 21 21 08 05 15 24 19 22 projects Subproyecto "Limoncillo" EC-MAG-136324-CW-RFB Component 1: Investments / Obra: Implementación de Solicitud de Single Stage - One 245,277.4 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- 2019-12- 2019-11- 2019-12- 2019-11- 2020-04- COFN / C1410 for climate-smart sub- Posterior Open - National 361,267.20 Firmado Riego Tecnificado en el ofertas Envelope 4 07 24 22 30 21 14 05 26 24 28 22 projects Subproyecto Puruguaypamba EC-MAG-142622-CW-RFB Component 1: Investments / Obra Implementación de Solicitud de Single Stage - One En 2019-10- 2019-11- 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-06- IBRD / 85150 for climate-smart sub- Posterior Open - National 660,046.04 0.00 Riego Tecnificado en el ofertas Envelope ejecución 28 26 02 03 02 11 01 11 09 projects subproyecto: La Playa EC-MAG-146606-CW-RFB / Implementación del sistema de riego parcelario Component 1: Investments por aspersión para la "Junta Solicitud de Single Stage - One 1,008,000. Ejecución 2019-11- 2019-11- 2019-12- 2020-01- 2020-02- 2020-08- IBRD / 85150 for climate-smart sub- Posterior Open - National 0.00 de Riego y Abrevadero de ofertas Envelope 00 pendiente 25 30 30 04 06 04 projects Paquiestancia" de la parroquia Ayora, cantón Cayambe, provincia de Pichincha EC-MAG-142621-CW-RFB Component 1: Investments / Obra Implementación de Solicitud de Single Stage - One 408,598.8 En 2019-12- 2019-12- 2019-12- 2019-12- 2019-12- 2019-12- 2020-01- 2020-01- 2020-01- 2020-05- IBRD / 85150 for climate-smart sub- Posterior Open - National 480,000.00 Riego Tecnificado en el ofertas Envelope 5 ejecución 05 04 07 10 28 18 02 16 12 11 projects Subproyecto: San Francisco de Orongo EC-MAG-136317-CW-RFB Component 1: Investments Solicitud de Single Stage - One 2,240,000. En 2019-10- 2020-09- 2019-10- 2020-09- 2019-11- 2019-12- 2019-12- 2020-12- / OBRA DEL SUBPROYECTO IBRD / 85150 for climate-smart sub- Posterior Open - National 0.00 ofertas Envelope 00 ejecución 07 23 22 23 21 05 24 18 CEREZAL BELLAVISTA projects EC-MAG-94904-CW-RFB / Component 1: Investments Solicitud de Single Stage - One 1,159,200. En 2020-09- 2020-10- 2020-09- 2020-10- 2020-10- 2020-10- 2020-11- 2021-05- OBRA DEL SUBPROYECTO IBRD / 85150 for climate-smart sub- Posterior Open - National 0.00 ofertas Envelope 00 ejecución 01 28 06 28 06 21 23 22 CHAMBITOLA projects EC-MAG-189209-CW-RFB Component 1: Investments Solicitud de Single Stage - One 2,643,200. En 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- 2020-10- 2020-11- 2021-07- / OBRA DEL SUBPROYECTO IBRD / 85150 for climate-smart sub- Posterior Open - National 0.00 ofertas Envelope 00 ejecución 01 16 06 17 06 07 09 07 CHIRIYACU LUCERO projects Page 2 EC-MAG-189212-CW-RFB Component 1: Investments Solicitud de Single Stage - One En 2020-09- 2020-10- 2020-09- 2020-10- 2020-10- 2020-10- 2020-11- 2021-05- / OBRA DEL SUBPROYECTO COFN / C1410 for climate-smart sub- Posterior Open - National 672,000.00 0.00 ofertas Envelope ejecución 01 29 06 29 06 21 23 22 SISTEMA DE RIEGO projects ARRIAGA EC-MAG-189213-CW-RFB Component 1: Investments / OBRA DEL SUBPROYECTO Solicitud de Single Stage - One En 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- 2020-10- 2020-11- 2021-04- COFN / C1410 for climate-smart sub- Posterior Open - National 537,600.00 0.00 SISTEMA DE RIEGO ofertas Envelope ejecución 01 17 06 18 06 21 23 22 projects BELISARIO QUEVEDO EC-MAG-189214-CW-RFB Component 1: Investments / OBRA DEL SUBPROYECTO Solicitud de Single Stage - One En 2020-09- 2020-10- 2020-09- 2020-10- 2020-10- 2020-10- 2020-11- 2021-03- COFN / C1410 for climate-smart sub- Posterior Open - National 403,200.00 0.00 SISTEMA DE RIEGO LAS ofertas Envelope ejecución 01 29 06 29 06 21 23 23 projects ARDILLAS EC-MAG-189215-CW-RFB Component 1: Investments Solicitud de Single Stage - One En 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- 2020-10- 2020-11- 2021-03- / OBRA DEL SUBPROYECTO IBRD / 85150 for climate-smart sub- Posterior Open - National 433,535.61 0.00 ofertas Envelope ejecución 01 17 06 17 06 21 23 23 LA BÉLGICA projects EC-MAG-189670-CW-RFB Component 1: Investments Solicitud de Single Stage - One 2020-09- 2020-09- 2020-10- 2020-10- 2020-11- 2021-05- / OBRA DEL SUBPROYECTO IBRD / 85150 for climate-smart sub- Posterior Open - National 672,524.38 0.00 Cancelado ofertas Envelope 07 12 12 27 29 28 LOS TINTALES projects EC-MAG-189210-CW-RFB Component 1: Investments Solicitud de Single Stage - One En 2020-10- 2020-10- 2020-10- 2020-10- 2020-11- 2020-11- 2021-02- 2021-07- / OBRA DEL SUBPROYECTO IBRD / 85150 for climate-smart sub- Posterior Open - National 944,160.00 0.00 ofertas Envelope ejecución 16 28 16 28 15 30 19 19 NUEVA SEMILLA Y 17 DE projects ABRIL EC-MAG-198832-CW-RFQ Component 1: Investments Solicitud de Single Stage - One Ejecución 2020-10- 2020-11- 2020-12- / Obra: Repotenciación del IBRD / 85150 for climate-smart sub- Posterior Open - National 7,255.66 0.00 cotizaciones Envelope pendiente 17 16 16 Subproyecto El Marco projects GOODS Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalificatio Estimated Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Signed Contract Contract Completion No. Approach Process n (Y/N) Amount (US$) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification Recommendation for Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PlannedAwardActual Planned Actual Planned Actual EC-MAGAP-8176-046 / Component 3: Project Solicitud de Single Stage - One 2016-05- 2016-09- 2016-09- 2016-10- Equipos de cómputo, IBRD / 85150 Posterior Open - National 44,061.00 37,203.90 Firmado Management cotizaciones Envelope 17 29 29 28 impresora y proyector UGP EC-MAGAP-8176-047 / Component 3: Project Solicitud de Single Stage - One 2016-05- 2016-10- 2016-10- 2016-11- IBRD / 85150 Posterior Open - National 182,400.00 144,535.00 Firmado Vehículos (4) Management cotizaciones Envelope 17 31 31 29 EC-MAGAP-8176-049 / Component 3: Project Solicitud de Single Stage - One 2017-02- 2017-04- 2017-05- 2017-05- IBRD / 85150 Posterior Open - National 40,698.00 33,426.62 Firmado Equipos de cómputo Management cotizaciones Envelope 15 08 18 08 EC-MAGAP-32767-GO- Component 3: Project Solicitud de Single Stage - One 2017-11- 2017-11- 2017-12- 2018-01- 2017-12- COFN / C1410 Posterior Open - National 39,566.13 24,074.40 Finalizado RFQ / Mobiliario para Management cotizaciones Envelope 03 22 22 06 27 oficinas EC-MAGAP-32776-GO- Component 3: Project Solicitud de Single Stage - One Ejecución 2017-11- 2017-11- 2017-12- IBRD / 85150 Posterior Open - National 4,592.00 0.00 RFQ / Materiales de oficina Management cotizaciones Envelope pendiente 06 25 25 EC-MAGAP-32778-GO- Component 3: Project Solicitud de Single Stage - One 2017-11- 2017-11- 2017-12- 2018-01- 2017-11- RFQ / Equipos y COFN / C1410 Posterior Open - National 71,548.96 60,858.15 Finalizado Management cotizaciones Envelope 06 25 28 09 06 suministros informáticos EC-MAGAP-8176-050 / Component 3: Project Solicitud de Single Stage - One 2017-02- 2017-04- 2017-05- Equipo topográfico: GPS IBRD / 85150 Posterior Open - National 2,234.40 0.00 Cancelado Management cotizaciones Envelope 17 23 08 Diferencial y Nivel EC-MAGAP-8176-048 / Component 3: Project Solicitud de Single Stage - One 2017-02- 2017-02- 2017-03- 2017-03- 2017-04- 2017-05- IBRD / 85150 Posterior Open - National 228,000.00 0.00 Cancelado Vehículos Management ofertas Envelope 13 17 19 29 23 23 EC-MAG-74050-GO-RFB / Component 3: Project Solicitud de Single Stage - One 2018-09- 2018-11- 2018-09- 2018-10- 2018-12- 2018-10- 2018-12- 2018-11- 2018-12- 2018-12- Adquisición de Vehículos COFN / C1410 Posterior Open - National 170,240.00 143,498.05 Firmado Management ofertas Envelope 17 22 22 20 05 25 05 04 13 31 para la UGP-PIT EC-MAGAP-32575-GO- Component 3: Project Solicitud de Single Stage - One 2017-10- 2017-11- 2017-12- RFQ / Vehículos para COFN / C1410 Posterior Open - National 99,902.88 0.00 Cancelado Management cotizaciones Envelope 30 18 08 Oficinas Técnicas Zonales (3) EC-MAGAP-32777-GO- Component 3: Project Solicitud de Single Stage - One Ejecución 2018-11- 2018-11- 2018-12- RFQ / Vestuario-Prendas IBRD / 85150 Posterior Open - National 34,720.00 0.00 Management cotizaciones Envelope pendiente 08 21 06 de Proteccion EC-MAGAP-32781-GO- Component 3: Project Solicitud de Single Stage - One 2017-11- 2017-12- 2018-01- COFN / C1410 Posterior Open - National 4,480.00 0.00 Cancelado RFQ / Kits para análisis de Management cotizaciones Envelope 13 02 01 campo EC-MAGAP-32779-GO- Component 3: Project Solicitud de Single Stage - One 2017-11- 2017-11- 2017-12- COFN / C1410 Posterior Open - National 11,200.00 0.00 Cancelado RFQ / Equipo Management cotizaciones Envelope 10 29 19 micromolinete EC-MAG-136326-GO-RFB / Adquisición de Insumos Agropecuarios que Component 2: Capacity coadyuven al fomento building for institutional productivo, agro Solicitud de Single Stage - One En 2019-10- 2019-11- 2019-10- 2019-11- 2019-12- 2019-12- 2020-02- IBRD / 85150 stakeholders and Posterior Open - National 232,512.00 0.00 transformación básica y ofertas Envelope ejecución 14 06 28 25 09 19 17 beneficiaries’ comercialización en los organizations subproyectos de tecnificación de riego parcelario localizados en provincias de la Sierra y Costa de Ecuador EC-MAG-205985-GO-RFB Component 2: Capacity / Inversiones en Prevención building for institutional Solicitud de Open - Single Stage - One Ejecución 2020-12- 2020-12- 2021-01- 2021-01- 2021-03- 2021-06- de contaminación y IBRD / 85150 stakeholders and Previa 1,280,272.00 0.00 ofertas International Envelope pendiente 01 06 20 27 01 29 optimización del uso del beneficiaries’ recurso hídrico en 14 organizations subproyectos NON CONSULTING SERVICES Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalificatio Estimated Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Signed Contract Contract Completion No. Approach Process n (Y/N) Amount (US$) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification Recommendation for Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PlannedAwardActual Planned Actual Planned Actual EC-MAGAP-8176-026 / Sistema informático MSE Component 3: Project Adquisición 2016-08- 2016-08- 2016-09- 2016-09- 2016-11- 2016-11- 2016-12- IBRD / 85150 Posterior Direct 8,550.00 8,550.00 Firmado Financiero: diseño, Management directa 15 23 22 29 02 01 02 capacitación y mantenimiento EC-MAGAP-14944-NC- Component 2: Capacity RFQ / EVENTO DE ESCUELA building for institutional Solicitud de Single Stage - One 2017-05- 2017-05- 2017-05- 2017-05- 2017-05- IBRD / 85150 Posterior Limited 16,121.24 16,120.00 Firmado NACIONAL DE IIRIGACIÓN stakeholders and cotizaciones Envelope 12 15 16 17 18 CAMPESINA beneficiaries’ organizations EC-MAGAP-8176-023 / Component 3: Project Solicitud de Single Stage - One 2017-04- 2017-06- 2017-10- Eventos (Promoción y IBRD / 85150 Posterior Open - National 11,400.00 0.00 Cancelado Management cotizaciones Envelope 13 30 31 Difusión) EC-MAGAP-8176-024 / Component 3: Project Solicitud de Single Stage - One 2017-04- 2017-06- 2017-10- Avisos de prensa IBRD / 85150 Posterior Open - National 11,400.00 0.00 Cancelado Management cotizaciones Envelope 13 30 31 (Promoción y Difusión) EC-MAGAP-8176-025 / Pautaje de radio locales Component 3: Project Solicitud de Single Stage - One 2017-04- 2017-06- 2017-10- IBRD / 85150 Posterior Open - National 14,250.00 0.00 Cancelado cuñas/ spot de television Management cotizaciones Envelope 13 30 31 (Promoción y Difusión) EC-MAGAP-8176-020 / Apoyo legal para legalización tenencia de la Component 1: Investments Solicitud de Single Stage - One 2017-06- 2017-08- 2018-02- tierra, organizaciones y IBRD / 85150 for climate-smart sub- Posterior Open - National 8,550.00 0.00 Cancelado cotizaciones Envelope 13 08 04 concesiones de agua para projects pequeños reservorios individuales y/o colectivos EC-MAGAP-8176-021 / Apoyo legal para Component 1: Investments legalización tenencia de la Solicitud de Single Stage - One 2017-06- 2017-08- 2018-01- IBRD / 85150 for climate-smart sub- Posterior Open - National 25,080.00 0.00 Cancelado tierra, organizaciones y cotizaciones Envelope 13 02 29 projects concesiones de agua para parcelas agrícolas EC-MAGAP-8176-022 / Component 3: Project Solicitud de Single Stage - One 2017-04- 2017-06- 2017-10- Impresiones (Promoción y IBRD / 85150 Posterior Open - National 11,400.00 0.00 Cancelado Management cotizaciones Envelope 13 30 31 Difusión) EC-MAGAP-8176-017 / Asis. Tec. & Cap. de Component 1: Investments aproximadamente 14 Solicitud de Single Stage - One 2017-08- 2017-08- 2017-09- 2017-09- 2017-10- 2018-10- IBRD / 85150 for climate-smart sub- Posterior Open - National 583,121.58 0.00 Cancelado subproyectos de riego ofertas Envelope 01 15 12 26 10 05 projects parcelario de la primera convocatoria EC-MAGAP-8176-011 / Component 1: Investments Solicitud de Open - Single Stage - One 2017-04- 2017-04- 2017-05- 2017-06- 2017-07- 2018-01- Asis. Tec. & Capacitación IBRD / 85150 for climate-smart sub- Posterior 515,299.52 0.00 Cancelado ofertas International Envelope 01 06 18 17 22 18 de riego tecnificado projects parcelario. EC-MAGAP-8176-019 / Asis. Tec. & Cap. de Component 1: Investments aproximadamente 2 Solicitud de Single Stage - One 2016-05- 2016-05- 2016-06- 2016-06- 2016-07- 2017-02- IBRD / 85150 for climate-smart sub- Posterior Open - National 100,713.35 0.00 Cancelado subproyectos de ofertas Envelope 01 15 12 26 10 05 projects microreservorios primera convocatoria EC-MAG-74026-NC-RFQ / Servicio logístico para Component 1: Investments realizar talleres de Solicitud de Single Stage - One 2018-09- 2018-10- 2018-12- IBRD / 85150 for climate-smart sub- Posterior Open - National 22,400.00 0.00 Cancelado preparación y evaluación, cotizaciones Envelope 19 02 31 projects demandadas por la Coordinación del PIT y Dirección Técnica. EC-MAG-74029-NC-RFQ / Servicio logístico para Component 1: Investments realizar talleres de Solicitud de Single Stage - One 2018-09- 2018-10- 2018-12- IBRD / 85150 for climate-smart sub- Posterior Open - National 28,000.00 0.00 Cancelado promoción, demandadas cotizaciones Envelope 19 02 31 projects por la Coordinación del PIT y la Dirección Técnica. EC-MAGAP-32577-NC- RFQ / Servicio logístico Component 1: Investments Solicitud de Single Stage - One 2017-10- 2017-11- 2017-12- para el desarrollo de IBRD / 85150 for climate-smart sub- Posterior Limited 20,000.00 0.00 Cancelado cotizaciones Envelope 29 09 24 eventos de promoción y projects difusión de los subproyectos EC-MAGAP-37384-NC- Component 1: Investments Solicitud de Single Stage - One 2018-03- 2018-03- 2018-12- RFQ / Servicio logístico IBRD / 85150 for climate-smart sub- Posterior Open - National 72,800.00 0.00 Cancelado cotizaciones Envelope 03 28 31 para eventos y talleres projects EC-MAGAP-37385-NC- Component 1: Investments Solicitud de Single Stage - One 2018-03- 2018-04- 2018-12- RFQ / Servicio de IBRD / 85150 for climate-smart sub- Posterior Open - National 84,000.00 0.00 Cancelado cotizaciones Envelope 10 04 31 publicación en medios projects escritos EC-MAGAP-37386-NC- Component 1: Investments Solicitud de Single Stage - One 2018-03- 2018-04- 2018-12- RFQ / Servicio de difusión IBRD / 85150 for climate-smart sub- Posterior Open - National 32,704.00 0.00 Cancelado cotizaciones Envelope 26 20 31 radial y promoción en projects redes sociales EC-MAGAP-18328-NC- RFQ / CONTRATACIÓN DEL SERVICIO DE EMISIÓN DE Component 3: Project Solicitud de Single Stage - One 2017-06- 2017-06- 2017-12- PASAJES AÉREOS, PARA LOS COFN / C1410 Posterior Limited 17,920.00 0.00 Cancelado Management cotizaciones Envelope 16 19 16 FUNCIONARIOS Y SERVIDORES DE LA UNIDAD DE GESTIÓN DEL PROYECTO PIT UGP-PIT EC-MAGAP-32784-NC- Component 3: Project Solicitud de Single Stage - One 2017-11- 2017-12- 2017-12- IBRD / 85150 Posterior Open - National 3,360.00 0.00 Cancelado RFQ / Licencias de software Management cotizaciones Envelope 15 04 24 EC-MAG-86481-NC-RFQ / Component 2: Capacity Servicio de topografía building for institutional Solicitud de Single Stage - One 2018-11- 2018-12- 2019-02- IBRD / 85150 Posterior Open - National 43,680.00 0.00 Cancelado (Subproyecto Jima, stakeholders and cotizaciones Envelope 20 10 28 Paquiestancia y Sanambay) beneficiaries’ organizations CONSULTING FIRMS Activity Reference No. / Short List and Draft Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Request for Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Request for Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Interest Notice Proposals as Issued Proposals / Minutes Technical Proposal Proposals Negotiated Contract Page 3 Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EC-MAGAP-8176-051 / Component 3: Project Selección basada 2016-07- 2016-08- 2016-08- 2016-09- 2016-09- 2016-10- 2016-10- 2016-10- 2016-10- 2016-10- 2016-11- 2016-11- 2017-05- IBRD / 85150 Posterior Open - National 20,000.00 0.00 En ejecución Auditoría Financiera Management en el menor 22 17 05 30 23 14 26 21 21 28 21 12 11 costo EC-MAGAP-8176-052 / Selección basada Component 3: Project 2016-12- 2016-11- 2016-12- 2017-01- 2017-01- 2017-01- 2017-02- 2017-02- 2017-03- 2017-02- 2017-03- 2017-03- 2017-04- 2018-03- Sistema informático IBRD / 85150 Posterior en calidad y Open - National 102,727.78 102,697.98 Firmado Management 23 28 28 13 16 15 13 04 09 21 31 19 20 19 gerencia de SMM&E costo EC-MAGAP-8176-053 / Component 1: Investments Selección basada Estudios de pre-inversión 2017-02- 2017-02- 2017-03- 2017-03- 2017-04- 2017-04- 2017-05- 2018-05- IBRD / 85150 for climate-smart sub- Posterior en calidad y Open - National 114,000.00 0.00 Cancelado en pequeños reservorios 15 20 08 30 09 21 08 08 projects costo individuales y/o colectivos EC-MAGAP-8176-054 / Component 1: Investments Selección basada 2017-02- 2017-02- 2017-03- 2017-03- 2017-04- 2017-04- 2017-05- 2018-05- Estudios de pre-inversión IBRD / 85150 for climate-smart sub- Posterior en calidad y Open - National 202,759.85 0.00 Cancelado 15 20 08 30 09 21 08 08 en las parcelas agrícolas projects costo EC-MAG-74044-CS-LCS / Selección basada Contratación del Servicio de Component 3: Project 2018-09- 2018-09- 2018-09- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2018-12- 2018-11- 2018-12- 2018-11- 2018-12- 2019-05- IBRD / 85150 Posterior en el menor Open - National 56,000.00 28,198.24 Firmado Auditoria Financiera del Management 05 30 19 23 25 19 25 05 28 05 03 28 13 28 12 costo Período Fiscal 2018 EC-MAG-74052-CS-LCS / Contratación de Servicio de Consultoría para la Selección basada Implementación de un Component 3: Project Ejecución 2018-09- 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- 2019-03- IBRD / 85150 Posterior en el menor Open - National 67,200.00 0.00 Software de Gestión Management pendiente 28 12 18 17 20 26 06 06 costo Documental en el Área de Tecnología y Desarrollo de la UGP-PIT EC-MAG-74058-CS-QCBS / Estudios de factibilidad y Component 1: Investments Selección basada diseño definitivos 2018-10- 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2018-12- 2019-10- IBRD / 85150 for climate-smart sub- Posterior en calidad y Open - National 365,526.99 0.00 Cancelado integrales de subproyectos: 07 21 27 26 29 05 15 21 projects costo riego, social y ambiental en las provincias con financiamiento BIRF EC-MAGAP-37589-CS- Component 2: Capacity QCBS / Asistencia Técnica y building for institutional Selección basada Capacitación Plan 2018-09- 2018-11- 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- 2019-12- IBRD / 85150 stakeholders and Posterior en calidad y Open - National 167,357.12 0.00 Cancelado Productivo y Ambiental - 10 08 10 25 04 14 26 06 01 beneficiaries’ costo Junta de riego acequia organizations Mocha Huachi - Distribuidor Pinguilí EC-MAGAP-37271-CS- Component 1: Investments Selección basada 2018-07- 2018-07- 2018-07- 2018-07- 2018-08- 2018-09- 2018-09- 2019-07- QCBS / Supervisión de obra IBRD / 85150 for climate-smart sub- Posterior en calidad y Open - National 154,224.00 0.00 Cancelado 01 06 24 28 17 03 29 26 de riego - Bolo Dolores projects costo EC-MAGAP-37612-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional Open - 2019-04- 2019-04- 2019-04- 2019-05- 2019-06- 2019-06- 2019-06- 2020-04- IBRD / 85150 Previa en calidad y 359,856.00 0.00 Cancelado Capacitación Plan stakeholders and International 01 13 30 22 01 13 30 25 costo Productivo y Ambiental - beneficiaries’ Bolo Dolores organizations EC-MAGAP-37352-CS- QCBS / Estudios de Component 1: Investments Selección basada Open - 2018-01- 2018-01- 2018-03- 2018-04- 2018-04- 2018-05- 2018-06- 2018-12- factibilidad y diseño IBRD / 85150 for climate-smart sub- Posterior en calidad y 453,600.00 0.00 Cancelado International 10 31 12 06 21 16 09 06 definitivos integrales de projects costo subproyectos: riego, social y ambiental - Zona: Costa EC-MAGAP-37347-CS- QCBS / Estudios de Component 1: Investments Selección basada factibilidad y diseño Open - 2017-12- 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2018-03- 2018-09- IBRD / 85150 for climate-smart sub- Previa en calidad y 604,800.00 0.00 Cancelado definitivos integrales de International 20 01 18 09 19 03 20 16 projects costo subproyectos: riego, social y ambiental - Zona: Sierra Norte EC-MAGAP-37351-CS- QCBS / Estudios de Component 1: Investments Selección basada factibilidad y diseño Open - 2017-12- 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2018-03- 2018-09- IBRD / 85150 for climate-smart sub- Previa en calidad y 621,600.00 0.00 Cancelado definitivos integrales de International 20 01 18 09 19 03 20 16 projects costo subproyectos: riego, social y ambiental - Zona: Sierra Centro Sur EC-MAGAP-37613-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-11- 2018-11- 2018-12- 2019-01- 2019-01- 2019-01- 2019-02- 2019-12- IBRD / 85150 Posterior en calidad y Open - National 141,120.00 0.00 Cancelado Capacitación Plan stakeholders and 13 25 12 03 13 25 11 08 costo Productivo y Ambiental - beneficiaries’ Zhinzhon organizations EC-MAGAP-37055-CS- Component 1: Investments Selección basada 2018-02- 2018-02- 2018-03- 2018-03- 2018-04- 2018-04- 2018-05- 2018-11- QCBS / Supervisión de obra IBRD / 85150 for climate-smart sub- Posterior en calidad y Open - National 109,166.40 0.00 Cancelado 15 20 10 14 03 20 16 12 de riego - Las Mercedes projects costo EC-MAGAP-37587-CS- Component 2: Capacity QCBS / Asistencia Técnica y building for institutional Selección basada Capacitación Plan 2018-07- 2018-07- 2018-07- 2018-08- 2018-09- 2018-09- 2018-09- 2019-07- IBRD / 85150 stakeholders and Posterior en calidad y Open - National 104,428.80 0.00 Cancelado Productivo y Ambiental - 02 14 31 22 01 13 30 27 beneficiaries’ costo Directorio de aguas de la organizations acequia "Mundug Yamate" EC-MAGAP-37580-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-08- 2018-08- 2018-08- 2018-09- 2018-10- 2018-10- 2018-10- 2019-08- IBRD / 85150 Posterior en calidad y Open - National 254,721.60 0.00 Cancelado Capacitación Plan stakeholders and 01 13 30 21 01 13 30 26 costo Productivo y Ambiental - beneficiaries’ Las Mercedes organizations EC-MAGAP-37272-CS- Component 1: Investments Selección basada 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2019-01- QCBS / Supervisión de obra IBRD / 85150 for climate-smart sub- Posterior en calificaciones Open - National 60,480.00 0.00 Cancelado 01 21 06 16 31 27 de riego - Zhinzhon projects de consultores EC-MAGAP-37596-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-08- 2018-09- 2018-09- 2018-09- 2018-10- 2019-08- IBRD / 85150 Posterior en calificaciones Open - National 28,224.00 0.00 Cancelado Capacitación Plan stakeholders and 12 01 16 26 11 07 de consultores Productivo y Ambiental - beneficiaries’ Tolontag organizations EC-MAGAP-37606-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-05- 2018-06- 2018-06- 2018-07- 2018-07- 2019-05- IBRD / 85150 Posterior en calificaciones Open - National 66,326.40 0.00 Cancelado Capacitación Plan stakeholders and 18 07 22 02 17 13 de consultores Productivo y Ambiental - La beneficiaries’ Belgica organizations EC-MAGAP-37603-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-11- 2018-12- 2018-12- 2018-12- 2019-01- 2019-11- IBRD / 85150 Posterior en calificaciones Open - National 39,513.60 0.00 Cancelado Capacitación Plan stakeholders and 15 05 20 30 14 10 de consultores Productivo y Ambiental - beneficiaries’ Milagro organizations EC-MAGAP-37268-CS- Component 1: Investments Selección basada 2018-05- 2018-05- 2018-06- 2018-06- 2018-06- 2018-12- QCBS / Supervisión de obra IBRD / 85150 for climate-smart sub- Posterior en calificaciones Open - National 51,408.00 0.00 Cancelado 01 21 05 15 30 27 de riego - Chambitola projects de consultores EC-MAGAP-37608-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-10- 2018-10- 2018-11- 2018-11- 2018-11- 2019-09- IBRD / 85150 Posterior en calificaciones Open - National 52,214.40 0.00 Cancelado Capacitación Plan stakeholders and 01 21 05 15 30 26 de consultores Productivo y Ambiental - beneficiaries’ Jesús María organizations EC-MAGAP-37257-CS- Component 1: Investments Selección basada QCBS / Supervisión de obra 2017-12- 2017-12- 2018-01- 2018-01- 2018-02- 2018-11- COFN / C1410 for climate-smart sub- Posterior en calificaciones Open - National 50,363.40 0.00 Cancelado de riego - Directorio de 11 31 15 25 09 06 projects de consultores aguas de la acequia "Mundug Yamate" EC-MAGAP-37593-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-05- 2018-05- 2018-06- 2018-06- 2018-06- 2019-04- IBRD / 85150 Posterior en calificaciones Open - National 52,637.76 0.00 Cancelado Capacitación Plan stakeholders and 01 21 05 15 30 26 de consultores Productivo y Ambiental - beneficiaries’ Luis Cordero organizations EC-MAGAP-37594-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-05- 2018-05- 2018-06- 2018-06- 2018-06- 2019-04- IBRD / 85150 Posterior en calificaciones Open - National 88,997.33 0.00 Cancelado Capacitación Plan stakeholders and 01 21 05 15 30 26 de consultores Productivo y Ambiental - beneficiaries’ Putucay organizations EC-MAGAP-37604-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-09- 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2018-12- 2019-10- IBRD / 85150 Posterior en calidad y Open - National 119,952.00 0.00 Cancelado Capacitación Plan stakeholders and 20 02 19 10 20 02 19 15 costo Productivo y Ambiental - beneficiaries’ Chambitola organizations EC-MAGAP-37601-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-08- 2018-08- 2018-09- 2018-09- 2018-10- 2019-08- IBRD / 85150 Posterior en calificaciones Open - National 70,560.00 0.00 Cancelado Capacitación Plan stakeholders and 10 30 14 24 09 05 de consultores Productivo y Ambiental - La beneficiaries’ Magdalena organizations EC-MAGAP-37583-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-04- 2018-04- 2018-05- 2018-05- 2018-06- 2019-03- IBRD / 85150 Posterior en calificaciones Open - National 23,856.34 0.00 Cancelado Capacitación Plan stakeholders and 02 22 07 17 01 28 de consultores Productivo y Ambiental - beneficiaries’ Huaquer organizations EC-MAGAP-37610-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-07- 2018-07- 2018-08- 2018-08- 2018-08- 2019-06- IBRD / 85150 Posterior en calificaciones Open - National 47,980.80 0.00 Cancelado Capacitación Plan stakeholders and 02 22 06 16 31 27 de consultores Productivo y Ambiental - beneficiaries’ Chumblin organizations EC-MAGAP-37598-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-04- 2018-05- 2018-05- 2018-06- 2018-06- 2019-04- IBRD / 85150 Posterior en calificaciones Open - National 31,752.00 0.00 Cancelado Capacitación Plan stakeholders and 25 15 30 09 24 20 de consultores Productivo y Ambiental - beneficiaries’ Verde Pacayunga organizations EC-MAGAP-37602-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-08- 2018-08- 2018-09- 2018-09- 2018-10- 2019-08- IBRD / 85150 Posterior en calificaciones Open - National 56,448.00 0.00 Cancelado Capacitación Plan stakeholders and 10 30 14 24 09 05 de consultores Productivo y Ambiental - La beneficiaries’ Libertad organizations EC-MAGAP-37597-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-05- 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2018-07- 2019-05- IBRD / 85150 Posterior en calidad y Open - National 93,844.80 0.00 Cancelado Capacitación Plan stakeholders and 01 13 30 21 01 13 30 26 costo Productivo y Ambiental - beneficiaries’ Estero Piedras organizations EC-MAGAP-37605-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-12- 2019-01- 2019-01- 2019-02- 2019-02- 2019-03- 2019-03- 2020-01- IBRD / 85150 Posterior en calidad y Open - National 285,768.00 0.00 Cancelado Capacitación Plan stakeholders and 20 01 18 09 19 03 20 14 costo Productivo y Ambiental - La beneficiaries’ Paquita organizations EC-MAGAP-37599-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-07- 2018-07- 2018-08- 2018-09- 2018-09- 2018-09- 2018-10- 2019-08- IBRD / 85150 Posterior en calidad y Open - National 93,139.20 0.00 Cancelado Capacitación Plan stakeholders and 16 28 14 05 15 27 14 10 costo Productivo y Ambiental - La beneficiaries’ Y del Guineo organizations EC-MAGAP-37591-CS- Component 2: Capacity QCBS / Asistencia Técnica y building for institutional Selección basada Capacitación Plan 2018-09- 2018-09- 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2019-09- IBRD / 85150 stakeholders and Posterior en calidad y Open - National 215,208.00 0.00 Cancelado Productivo y Ambiental - 03 15 02 24 03 15 02 28 beneficiaries’ costo Junta General de Usuarios organizations Píllaro - Ramal Norte (15 módulos) EC-MAG-74381-CS-QCBS Component 2: Capacity Selección basada / Asistencia Técnica y building for institutional 2018-09- 2018-11- 2018-09- 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- 2019-12- IBRD / 85150 Posterior en calidad y Open - National 201,163.59 0.00 Cancelado Capacitación Plan stakeholders and 10 08 25 10 09 14 27 06 01 costo Productivo y Ambiental - beneficiaries’ Toacaso organizations EC-MAG-74411-CS-CQS / Fiscalización de Obra de Component 1: Investments Selección basada 2018-10- 2019-03- 2018-11- 2018-11- 2018-12- 2018-12- 2019-04- Riego - Implementación de IBRD / 85150 for climate-smart sub- Posterior en calificaciones Open - National 62,995.48 0.00 En ejecución 23 26 07 29 04 10 09 sistema de riego por projects de consultores aspersión en el predio "La Paquita". EC-MAG-74409-CS-CQS / Component 2: Capacity Capacitación Técnica building for institutional Selección basada 2018-10- 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- Integral para IBRD / 85150 stakeholders and Posterior en calificaciones Open - National 89,600.00 0.00 Cancelado 23 07 29 04 10 08 Organizaciones y beneficiaries’ de consultores usuarios/as - organizations productores/as y equipo técnico. EC-MAGAP-37262-CS- QCBS / Supervisión de obra Component 1: Investments Selección basada 2017-12- 2017-12- 2017-12- 2017-12- 2018-01- 2018-02- 2018-03- 2018-12- de riego - Junta General de COFN / C1410 for climate-smart sub- Posterior en calidad y Open - National 101,779.31 0.00 Cancelado 01 06 24 28 17 03 01 26 Usuarios Píllaro - Ramal projects costo Norte (15 módulos) EC-MAGAP-37252-CS- Component 1: Investments Selección basada 2017-12- 2018-01- 2018-01- 2018-02- 2018-02- 2018-08- QCBS / Supervisión de obra IBRD / 85150 for climate-smart sub- Posterior en calificaciones Open - National 39,916.80 0.00 Cancelado 20 09 24 03 18 17 de riego - Santa Ana projects de consultores EC-MAGAP-37266-CS- Component 1: Investments Selección basada 2017-12- 2018-01- 2018-01- 2018-02- 2018-02- 2018-07- QCBS / Supervisión de obra IBRD / 85150 for climate-smart sub- Posterior en calificaciones Open - National 44,217.60 0.00 Cancelado 20 09 24 03 18 18 de riego - Estero Piedras projects de consultores EC-MAGAP-37267-CS- Component 1: Investments Selección basada 2018-01- 2018-02- 2018-02- 2018-03- 2018-03- 2018-09- QCBS / Supervisión de obra IBRD / 85150 for climate-smart sub- Posterior en calificaciones Open - National 44,352.00 0.00 Cancelado 15 04 19 01 16 12 de riego - La Y del Guineo projects de consultores Page 4 EC-MAGAP-37270-CS- Component 1: Investments Selección basada 2018-05- 2018-05- 2018-05- 2018-05- 2018-06- 2018-07- 2018-07- 2019-04- QCBS / Supervisión de obra IBRD / 85150 for climate-smart sub- Posterior en calidad y Open - National 122,472.00 0.00 Cancelado 01 06 24 28 17 04 30 26 de riego - La Paquita projects costo EC-MAGAP-37581-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2019-05- IBRD / 85150 Posterior en calificaciones Open - National 84,672.00 0.00 Cancelado Capacitación Plan stakeholders and 01 21 06 16 31 27 de consultores Productivo y Ambiental - beneficiaries’ Santa Ana organizations EC-MAG-75734-CS-CQS / Component 2: Capacity Selección basada Asistencia Técnica y building for institutional 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- IBRD / 85150 Posterior en calificaciones Open - National 43,974.64 0.00 Cancelado Capacitación Plan stakeholders and 23 08 07 29 04 10 08 de consultores Ambiental y Productivo - beneficiaries’ Santa Ana organizations EC-MAGAP-37614-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior en calificaciones Open - National 52,012.80 0.00 Cancelado Capacitación Plan stakeholders and 10 30 14 24 11 05 de consultores Productivo - San Rafael beneficiaries’ organizations EC-MAG-75756-CS-CQS / Component 2: Capacity Selección basada Asistencia Técnica y building for institutional 2018-10- 2018-10- 2018-11- 2018-10- 2018-11- 2018-11- 2018-12- 2019-06- 2018-12- 2019-07- 2019-06- IBRD / 85150 Posterior en calificaciones Open - National 52,012.80 46,036.00 Firmado Capacitación Plan stakeholders and 23 02 07 17 29 20 04 05 10 15 08 de consultores Productivo y Ambiental - beneficiaries’ San Rafael organizations EC-MAGAP-37615-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior en calificaciones Open - National 66,206.81 0.00 Cancelado Capacitación Plan stakeholders and 10 30 14 24 11 05 de consultores Productivo - Pucalpa beneficiaries’ organizations EC-MAG-75759-CS-CQS / Component 2: Capacity Selección basada Asistencia Técnica y building for institutional 2018-10- 2018-10- 2018-11- 2018-10- 2018-11- 2018-10- 2018-12- 2018-12- 2018-12- 2019-12- 2019-06- IBRD / 85150 Posterior en calificaciones Open - National 66,206.82 66,206.00 Firmado Capacitación Plan stakeholders and 23 03 07 17 29 30 04 03 10 20 08 de consultores Productivo y Ambiental - beneficiaries’ Pucalpa organizations EC-MAGAP-37617-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior en calificaciones Open - National 69,216.00 0.00 Cancelado Capacitación Plan stakeholders and 10 30 14 24 11 05 de consultores Productivo - Gral. Plaza beneficiaries’ organizations EC-MAG-75760-CS-CQS / Component 2: Capacity Selección basada Asistencia Técnica y building for institutional 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- IBRD / 85150 Posterior en calificaciones Open - National 69,216.00 0.00 Cancelado Capacitación Plan stakeholders and 23 08 07 29 04 10 08 de consultores Productivo y Ambiental - beneficiaries’ Gral. Plaza organizations EC-MAGAP-37618-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior en calificaciones Open - National 52,155.01 0.00 Cancelado Capacitación Plan stakeholders and 10 30 14 24 11 05 de consultores Productivo - Palmar Grande beneficiaries’ organizations EC-MAG-75761-CS-CQS / Component 2: Capacity Selección basada Asistencia Técnica y building for institutional 2018-10- 2018-10- 2018-11- 2018-10- 2018-11- 2018-10- 2018-12- 2018-12- 2018-12- 2018-12- 2019-06- 2019-08- IBRD / 85150 Posterior en calificaciones Open - National 52,155.01 52,150.78 Finalizado Capacitación Plan stakeholders and 23 10 07 17 29 30 04 20 10 20 08 15 de consultores Productivo y Ambiental - beneficiaries’ Palmar Grande organizations EC-MAGAP-37619-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior en calificaciones Open - National 33,787.42 0.00 Cancelado Capacitación Plan stakeholders and 10 30 14 24 11 05 de consultores Productivo - Cutahua beneficiaries’ organizations EC-MAG-75762-CS-CQS / Component 2: Capacity Selección basada Asistencia Técnica y building for institutional 2018-10- 2018-11- 2018-10- 2018-11- 2018-12- 2018-12- 2019-06- IBRD / 85150 Posterior en calificaciones Open - National 33,787.43 0.00 Cancelado Capacitación Plan stakeholders and 23 07 17 29 04 10 08 de consultores Productivo y Ambiental - beneficiaries’ Cutahua organizations EC-MAGAP-37620-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior en calificaciones Open - National 27,870.36 0.00 Cancelado Capacitación Plan stakeholders and 10 30 14 24 11 05 de consultores Productivo - Zhilla beneficiaries’ organizations EC-MAG-75763-CS-CQS / Component 2: Capacity Selección basada Asistencia Técnica y building for institutional 2018-10- 2018-10- 2018-11- 2018-10- 2018-11- 2018-11- 2018-12- 2018-11- 2018-12- 2019-03- 2019-06- 2019-11- IBRD / 85150 Posterior en calificaciones Open - National 27,870.36 28,884.00 Finalizado Capacitación Plan stakeholders and 23 02 07 12 29 12 04 26 10 27 08 07 de consultores Productivo y Ambiental - beneficiaries’ Zhilla organizations EC-MAGAP-37621-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior en calificaciones Open - National 53,541.68 0.00 Cancelado Capacitación Plan stakeholders and 10 30 14 24 11 05 de consultores Productivo - La era beneficiaries’ organizations EC-MAG-75764-CS-CQS / Component 2: Capacity Selección basada Asistencia Técnica y building for institutional 2018-10- 2018-10- 2018-11- 2018-10- 2018-11- 2018-10- 2018-12- 2018-11- 2018-12- 2018-12- 2019-06- 2019-11- IBRD / 85150 Posterior en calificaciones Open - National 53,541.69 44,133.60 Finalizado Capacitación Plan stakeholders and 23 02 07 12 29 29 04 26 10 26 08 27 de consultores Productivo y Ambiental - La beneficiaries’ Era organizations EC-MAG-75765-CS-CQS / Component 2: Capacity Selección basada Asistencia Técnica y building for institutional 2018-10- 2018-10- 2018-11- 2018-10- 2018-11- 2018-11- 2018-12- 2018-11- 2018-12- 2018-12- 2019-06- 2019-11- IBRD / 85150 Posterior en calificaciones Open - National 32,116.64 32,116.00 Finalizado Capacitación Plan stakeholders and 23 02 07 12 29 12 04 27 10 26 08 27 de consultores Productivo y Ambiental - beneficiaries’ Campozano organizations EC-MAG-75766-CS-CQS / Component 2: Capacity Selección basada Asistencia Técnica y building for institutional 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- IBRD / 85150 Posterior en calificaciones Open - National 33,979.41 0.00 Cancelado Capacitación Plan stakeholders and 23 08 07 29 04 10 08 de consultores Productivo y Ambiental - El beneficiaries’ Marco organizations EC-MAGAP-37623-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior en calificaciones Open - National 33,979.40 0.00 Cancelado Capacitación Plan stakeholders and 10 30 14 24 11 05 de consultores Productivo - El Marco beneficiaries’ organizations EC-MAGAP-37624-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior en calificaciones Open - National 31,264.69 0.00 Cancelado Capacitación Plan stakeholders and 10 30 14 24 11 05 de consultores Productivo - Voluntad de beneficiaries’ Dios organizations EC-MAG-75767-CS-CQS / Component 2: Capacity Selección basada Asistencia Técnica y building for institutional 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- IBRD / 85150 Posterior en calificaciones Open - National 31,264.71 0.00 Cancelado Capacitación Plan stakeholders and 23 08 07 29 04 10 08 de consultores Productivo y Ambiental - beneficiaries’ Voluntad de Dios organizations EC-MAGAP-37625-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior en calificaciones Open - National 28,888.55 0.00 Cancelado Capacitación Plan stakeholders and 10 30 14 24 11 05 de consultores Productivo - Palo Marcado beneficiaries’ organizations EC-MAGAP-37622-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2019-01- IBRD / 85150 Posterior en calificaciones Open - National 32,116.64 0.00 Cancelado Capacitación Plan stakeholders and 10 30 14 24 11 05 de consultores Productivo - Campozano beneficiaries’ organizations EC-MAG-75768-CS-CQS / Component 2: Capacity Selección basada Asistencia Técnica y building for institutional 2018-10- 2018-10- 2018-11- 2018-10- 2018-11- 2018-11- 2018-12- 2018-11- 2018-12- 2018-12- 2019-06- IBRD / 85150 Posterior en calificaciones Open - National 28,888.56 28,888.56 Firmado Capacitación Plan stakeholders and 23 02 07 12 29 07 04 26 10 11 08 de consultores Productivo y Ambiental - beneficiaries’ Palo Marcado organizations EC-MAGAP-37585-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-11- 2018-12- 2018-12- 2018-12- 2019-01- 2019-11- IBRD / 85150 Posterior en calificaciones Open - National 33,163.20 0.00 Cancelado Capacitación Plan stakeholders and 15 05 20 30 14 10 de consultores Productivo y Ambiental - beneficiaries’ Nueva Esperanza organizations EC-MAG-75769-CS-CQS / Component 2: Capacity Selección basada Asistencia Técnica y building for institutional 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- IBRD / 85150 Posterior en calificaciones Open - National 39,860.68 0.00 Cancelado Capacitación Plan stakeholders and 23 08 07 29 04 10 08 de consultores Productivo y Ambiental - beneficiaries’ Nueva Esperanza organizations EC-MAG-75771-CS-CQS / Component 2: Capacity Selección basada Asistencia Técnica y building for institutional 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- 2018-12- 2019-06- IBRD / 85150 Posterior en calificaciones Open - National 30,033.57 0.00 Cancelado Capacitación Plan stakeholders and 23 08 07 29 04 10 08 de consultores Productivo y Ambiental - beneficiaries’ Sierra Morena organizations EC-MAGAP-37586-CS- Component 2: Capacity Selección basada QCBS / Asistencia Técnica y building for institutional 2018-07- 2018-07- 2018-08- 2018-08- 2018-09- 2019-07- IBRD / 85150 Posterior en calificaciones Open - National 35,251.78 0.00 Cancelado Capacitación Plan stakeholders and 10 30 14 24 08 05 de consultores Productivo y Ambiental - beneficiaries’ Sierra Morena organizations EC-MAGAP-37592-CS- Component 2: Capacity QCBS / Asistencia Técnica y building for institutional Selección basada Capacitación Plan Open - 2018-11- 2018-12- 2018-12- 2019-01- 2019-01- 2019-02- 2019-02- 2019-12- IBRD / 85150 stakeholders and Posterior en calidad y 409,248.00 0.00 Cancelado Productivo y Ambiental - International 25 07 24 15 25 06 23 20 beneficiaries’ costo Junta General de Usuarios organizations del Sistema de Riego Píllaro Ramal El Rosario EC-MAGAP-37260-CS- QCBS / Supervisión de obra Component 1: Investments Selección basada 2017-12- 2017-12- 2018-01- 2018-01- 2018-02- 2018-08- de riego - Junta de riego COFN / C1410 for climate-smart sub- Posterior en calificaciones Open - National 44,732.29 0.00 Cancelado 08 28 12 22 06 05 acequia Mocha Huachi - projects de consultores Distribuidor Pinguilí EC-MAGAP-37383-CS- Selección basada Component 3: Project 2018-09- 2018-09- 2018-10- 2018-10- 2018-11- 2019-04- QCBS / Auditoría Financiera IBRD / 85150 Posterior en calificaciones Open - National 56,000.00 0.00 Cancelado Management 03 23 08 18 02 01 - Tercer Periodo de consultores EC-MAG-74363-CS-CQS / Fiscalización de Obra de Component 1: Investments Selección basada Riego - Implementación de 2018-10- 2018-11- 2018-11- 2018-12- 2018-12- 2019-05- COFN / C1410 for climate-smart sub- Posterior en calificaciones Open - National 70,623.46 0.00 Cancelado riego parcelario tecnificado 23 07 29 04 10 09 projects de consultores en 15 módulos del sistema de riego "Píllaro Ramal Norte" EC-MAG-74649-CS-CQS / Fiscalización de Obra de Riego - Subproyecto: Component 1: Investments Selección basada Implementación del 2018-10- 2018-11- 2018-11- 2018-12- 2018-12- 2019-05- IBRD / 85150 for climate-smart sub- Posterior en calificaciones Open - National 16,853.13 0.00 Cancelado sistema de riego parcelario 23 07 29 04 10 09 projects de consultores por aspersión para la "Asociación de Productores Agropecuarios La Nueva Esperanza" EC-MAG-74360-CS-CQS / Fiscalización de Obra de Component 1: Investments Selección basada Riego - Implementación del 2018-10- 2018-11- 2018-11- 2018-12- 2018-12- 2019-05- IBRD / 85150 for climate-smart sub- Posterior en calificaciones Open - National 15,627.84 0.00 Cancelado Sistema de riego parcelario 23 07 29 04 10 09 projects de consultores por aspersión para la Asociación Agropecuaria "Sierra Morena" EC-MAGAP-37265-CS- QCBS / Fiscalización de Component 1: Investments Selección basada Obra de Riego - 2018-09- 2018-09- 2018-10- 2018-11- 2018-11- 2018-11- 2018-12- 2019-10- IBRD / 85150 for climate-smart sub- Posterior en calidad y Open - National 143,787.32 0.00 Cancelado Implementación de riego 09 14 28 01 15 27 05 31 projects costo parcelario tecnificado en veinte módulos del sistema de riego "Píllaro Ramal Sur" EC-MAG-74384-CS-CQS / Component 2: Capacity Selección basada Asistencia Técnica y building for institutional 2018-09- 2018-11- 2018-09- 2018-10- 2018-11- 2018-11- 2019-11- IBRD / 85150 Posterior en calificaciones Open - National 88,248.29 0.00 Cancelado Capacitación Plan stakeholders and 10 08 20 25 04 14 09 de consultores Productivo y Ambiental - beneficiaries’ Sucuso organizations EC-MAG-74057-CS-QCBS / Estudios de factibilidad y Component 1: Investments Selección basada diseño definitivos 2018-10- 2018-10- 2018-10- 2018-11- 2018-11- 2018-12- 2018-12- 2019-08- COFN / C1410 for climate-smart sub- Posterior en calidad y Open - National 548,622.62 0.00 Cancelado integrales de subproyectos: 07 21 27 26 29 05 15 12 projects costo riego, social y ambiental en las provincias con financiamiento AECID Component 2: Capacity EC-MAG-87308-CS-CQS / Selección basada building for institutional 2018-11- 2018-12- 2019-01- 2019-01- 2019-01- 2019-07- Estudios Subproyecto COFN / C1410 Posterior en calificaciones Open - National 84,000.00 0.00 Cancelado stakeholders and 29 14 05 10 16 15 Sarachupa de consultores beneficiaries’ organizations EC-MAG-94941-CS-CQS / Fiscalización de Obra de Component 1: Investments Selección basada 2019-08- 2019-08- 2019-09- 2019-09- 2019-09- 2020-02- Riego - Implementación del IBRD / 85150 for climate-smart sub- Posterior en calificaciones Open - National 72,499.39 0.00 Cancelado 13 27 16 19 27 24 Sistema de Riego projects de consultores Tecnificado para la Comuna Chambitola EC-MAG-94967-CS-LCS / Selección basada Servicio de Auditoria Component 3: Project 2019-09- 2019-11- 2019-09- 2019-09- 2019-10- 2019-10- 2019-11- 2019-11- 2020-05- IBRD / 85150 Posterior en el menor Open - National 56,000.00 0.00 En ejecución Financiera del período Management 05 13 19 25 25 28 05 18 16 costo fiscal 2019 EC-MAG-95121-CS-QCBS / Fiscalización - Component 1: Investments Selección basada Subproyecto: 2019-01- 2019-03- 2019-02- 2019-02- 2019-05- 2019-03- 2019-07- 2019-03- 2019-07- 2019-04- 2019-09- 2019-04- 2019-10- 2020-01- IBRD / 85150 for climate-smart sub- Posterior en calidad y Open - National 143,787.78 154,817.16 Firmado Implementación de riego 28 26 11 25 30 04 30 18 26 08 03 16 25 11 projects costo parcelario tecnificado en veinte módulos del sistema de riego "Píllaro Ramal Sur" Page 5 EC-MAG-95123-CS-CQS / Fiscalización - Component 1: Investments Selección basada Subproyecto: 2019-01- 2019-03- 2019-02- 2019-03- 2019-06- 2019-03- 2019-06- 2019-03- 2019-07- 2019-12- COFN / C1410 for climate-smart sub- Posterior en calificaciones Open - National 70,623.46 70,597.20 Firmado Implementación de riego 28 26 12 05 11 11 27 19 04 14 projects de consultores parcelario tecnificado en 15 módulos del sistema de riego Píllaro Ramal Norte EC-MAG-95187-CS-CQS / Component 2: Capacity Capacitación y Asistencia building for institutional Selección basada 2019-10- 2019-11- 2019-11- 2019-12- 2019-12- 2020-12- Técnica para la Puesta en IBRD / 85150 stakeholders and Posterior en calificaciones Open - National 45,358.91 0.00 Cancelado 21 04 25 02 10 04 Marcha, Plan Productivo y beneficiaries’ de consultores Ambiental - Luis Cordero organizations EC-MAG-109154-CS-CQS Component 2: Capacity Selección basada / Asistencia Técnica y building for institutional 2019-06- 2019-10- 2019-07- 2019-10- 2019-07- 2019-11- 2019-07- 2019-12- 2019-08- 2020-07- 2020-05- IBRD / 85150 Posterior en calificaciones Open - National 64,418.09 58,567.90 Firmado Capacitación Plan stakeholders and 17 04 01 07 22 07 29 12 06 01 02 de consultores Productivo y Ambiental - beneficiaries’ General Plaza organizations EC-MAG-109173-CS-CQS Component 2: Capacity Selección basada / Asistencia Técnica y building for institutional Ejecución 2019-06- 2019-07- 2019-07- 2019-07- 2019-08- 2020-05- IBRD / 85150 Posterior en calificaciones Open - National 80,508.46 0.00 Capacitación Plan stakeholders and pendiente 17 01 22 29 06 02 de consultores Productivo y Ambiental - beneficiaries’ Sucuso organizations EC-MAG-109180-CS-CQS Component 2: Capacity Selección basada / Asistencia Técnica y building for institutional 2019-04- 2019-07- 2019-05- 2019-05- 2019-10- 2019-06- 2019-11- 2019-06- 2019-12- 2019-12- IBRD / 85150 Posterior en calificaciones Open - National 39,864.16 39,862.76 Firmado Capacitación Plan stakeholders and 22 16 06 27 04 03 05 11 10 08 de consultores Productivo y Ambiental - El beneficiaries’ Marco organizations EC-MAG-109182-CS-CQS Component 2: Capacity Selección basada / Asistencia Técnica y building for institutional 2019-04- 2019-05- 2019-05- 2019-06- 2019-06- 2019-12- IBRD / 85150 Posterior en calificaciones Open - National 41,888.46 0.00 Cancelado Capacitación Plan stakeholders and 22 06 27 03 11 08 de consultores Productivo y Ambiental - beneficiaries’ Voluntad de Dios organizations EC-MAG-109183-CS-CQS Component 2: Capacity Selección basada / Asistencia Técnica y building for institutional 2019-04- 2019-07- 2019-05- 2019-05- 2019-10- 2019-06- 2019-10- 2019-06- 2019-12- 2019-12- IBRD / 85150 Posterior en calificaciones Open - National 40,921.01 40,918.08 Firmado Capacitación Plan stakeholders and 22 16 06 27 04 03 31 11 10 08 de consultores Productivo y Ambiental - beneficiaries’ Cutahua organizations Component 2: Capacity EC-MAG-87306-CS-CQS / Selección basada building for institutional 2019-07- 2019-08- 2019-07- 2019-08- 2019-09- 2019-08- 2019-10- 2019-08- 2019-11- 2020-02- Estudios Subproyecto IBRD / 85150 Posterior en calificaciones Open - National 93,141.57 93,610.16 Firmado stakeholders and 12 15 27 18 25 23 29 29 21 25 Potrerillos de consultores beneficiaries’ organizations Component 2: Capacity EC-MAG-87312-CS-QCBS Selección basada building for institutional 2019-07- 2019-10- 2019-07- 2019-10- 2019-08- 2019-11- 2019-09- 2019-12- 2019-09- 2019-12- 2019-09- 2020-01- 2019-10- 2020-02- / Estudios Subproyecto IBRD / 85150 Posterior en calidad y Open - National 212,678.50 0.00 Cancelado stakeholders and 12 04 27 07 11 26 10 18 15 26 28 02 07 10 Cariacu costo beneficiaries’ organizations EC-MAGAP-87307-CS- Component 2: Capacity Selección basada CQS / Estudios building for institutional 2019-07- 2019-08- 2019-07- 2019-08- 2019-09- 2019-08- 2019-10- 2019-08- 2019-11- 2020-02- COFN / C1410 Posterior en calificaciones Open - National 92,126.20 112,788.03 Firmado Subproyecto Santa Ana de stakeholders and 12 09 27 18 25 23 28 29 28 25 de consultores Cagrin Zula beneficiaries’ organizations EC-MAG-94915-CS-CQS / Fiscalización de Obra de Component 1: Investments Selección basada 2019-08- 2019-08- 2019-09- 2019-09- 2019-09- 2020-02- Riego - Implementación de IBRD / 85150 for climate-smart sub- Posterior en calificaciones Open - National 78,353.88 0.00 Cancelado 02 17 07 13 21 18 Sistema de Riego projects de consultores Tecnificado en el Predio "Las Mercedes" EC-MAG-136074-CS-CQS / Fiscalización de Obra de Component 1: Investments Selección basada 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- 2019-11- 2019-12- 2019-11- 2019-12- 2020-04- Riego - Implementación del IBRD / 85150 for climate-smart sub- Posterior en calificaciones Open - National 78,384.12 78,111.88 Firmado 01 08 15 15 05 14 11 19 18 13 16 Sistema de Riego projects de consultores Tecnificado en el Predio "Las Mercedes" EC-MAG-136075-CS-CQS / Fiscalización de Obra: Construcción de Microreservorios e Component 1: Investments Selección basada 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- 2019-11- 2020-08- Implementación de Riego IBRD / 85150 for climate-smart sub- Posterior en calificaciones Open - National 62,056.75 0.00 En ejecución 01 09 15 15 05 11 18 14 Parcelario Tecnificado para projects de consultores la Asociación de Producción Cafetalera del Sur Oriente de la Provincia de Loja "Procafeq" EC-MAG-119871-CS-CQS / Fiscalización - Obra: Construcción de Microreservorios e Component 1: Investments Selección basada 2019-06- 2019-07- 2019-08- 2019-08- 2019-08- 2020-05- Implementación de Riego IBRD / 85150 for climate-smart sub- Posterior en calificaciones Open - National 68,262.88 0.00 Cancelado 26 11 01 07 19 15 Parcelario Tecnificado para projects de consultores la Asociación de Producción Cafetalera del Sur Oriente de la Provincia de Loja "Procafeq" EC-MAG-119868-CS-CQS / Fiscalización - Obra: Implementación de Microreservorios con Riego Component 1: Investments Selección basada 2019-06- 2019-07- 2019-08- 2019-08- 2019-08- 2019-12- Parcelario Tecnificado por IBRD / 85150 for climate-smart sub- Posterior en calificaciones Open - National 61,927.88 0.00 Cancelado 26 11 01 07 19 17 Aspersión y Goteo en la projects de consultores "Junta de Aguas de Riego de la Acequia del Pueblo de Pimampiro" EC-MAG-94809-CS-CQS / Component 2: Capacity Capacitación y Asistencia building for institutional Selección basada 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2020-01- 2019-11- 2020-05- 2019-12- 2020-05- Técnica para la Puesta en IBRD / 85150 stakeholders and Posterior en calificaciones Open - National 86,927.25 59,985.80 En ejecución 10 10 24 18 14 30 21 14 02 30 Marcha, Plan Productivo y beneficiaries’ de consultores Ambiental - La Libertad organizations EC-MAG-136541-CS- Component 1: Investments Selección basada QCBS / Estudios y diseño a Ejecución 2019-10- 2019-10- 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- 2020-07- COFN / C1410 for climate-smart sub- Posterior en calidad y Open - National 243,600.00 0.00 nivel definitivo del pendiente 07 22 05 05 12 26 03 01 projects costo Subproyecto Tintales EC-MAG-87314-CS-QCBS Component 1: Investments Selección basada / Estudios y diseños a nivel 2018-11- 2019-09- 2018-12- 2019-10- 2018-12- 2019-01- 2019-02- 2019-02- 2019-02- 2019-08- IBRD / 85150 for climate-smart sub- Posterior en calidad y Open - National 194,880.00 0.00 Cancelado definitivo del Subproyecto 29 30 14 10 29 28 02 15 24 13 projects costo Santiago EC-MAG-136544-CS- Component 1: Investments Selección basada QCBS / Estudios y diseño a 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- 2020-07- COFN / C1410 for climate-smart sub- Posterior en calidad y Open - National 420,000.00 0.00 En ejecución nivel definitivo Subproyecto 07 23 22 24 05 05 12 26 03 01 projects costo San Isidro EC-MAG-136553-CS- Component 1: Investments Selección basada QCBS / Estudios y diseños Ejecución 2019-10- 2019-10- 2019-11- 2019-12- 2019-12- 2019-12- 2020-01- 2020-06- IBRD / 85150 for climate-smart sub- Posterior en calidad y Open - National 121,800.00 0.00 a nivel definitivo del pendiente 07 22 05 05 12 26 03 21 projects costo Subproyecto Yacubamba Component 2: Capacity EC-MAG-87311-CS-QCBS Selección basada building for institutional Ejecución 2020-02- 2020-03- 2020-03- 2020-04- 2020-04- 2020-05- 2020-05- 2020-09- / Estudios Subproyecto COFN / C1410 Posterior en calidad y Open - National 168,000.00 0.00 stakeholders and pendiente 24 10 25 24 29 12 21 24 Cebadas costo beneficiaries’ organizations EC-MAG-94800-CS-QCBS Component 2: Capacity / Capacitación y Asistencia building for institutional Selección basada Ejecución 2020-02- 2020-03- 2020-03- 2020-04- 2020-04- 2020-05- 2020-05- 2021-05- Técnica para la Puesta en IBRD / 85150 stakeholders and Posterior en calidad y Open - National 141,836.80 0.00 pendiente 24 10 25 24 29 12 21 16 Marcha, Plan Productivo y beneficiaries’ costo Ambiental - Píllaro Norte organizations EC-MAG-95167-CS-QCBS Component 2: Capacity / Capacitación y Asistencia building for institutional Selección basada Ejecución 2020-02- 2020-03- 2020-03- 2020-04- 2020-04- 2020-05- 2020-05- 2021-05- Técnica para la Puesta en IBRD / 85150 stakeholders and Posterior en calidad y Open - National 142,555.84 0.00 pendiente 24 10 25 24 29 12 21 16 Marcha, Plan Productivo y beneficiaries’ costo Ambiental - Mundug organizations Yamate EC-MAG-94943-CS-QCBS Component 2: Capacity / Capacitación y Asistencia building for institutional Selección basada Ejecución 2020-02- 2020-03- 2020-03- 2020-04- 2020-04- 2020-05- 2020-05- 2021-05- Técnica para la Puesta en IBRD / 85150 stakeholders and Posterior en calidad y Open - National 106,779.99 0.00 pendiente 24 10 25 24 29 12 21 16 Marcha, Plan Productivo y beneficiaries’ costo Ambiental - Las Mercedes organizations EC-MAG-95147-CS-CQS / Component 2: Capacity Capacitación y Asistencia building for institutional Selección basada Ejecución 2020-03- 2020-03- 2020-04- 2020-04- 2020-04- 2021-04- para la Puesta en Marcha, IBRD / 85150 stakeholders and Posterior en calificaciones Open - National 65,548.46 0.00 pendiente 02 16 06 13 21 16 Plan Productivo y Ambiental beneficiaries’ de consultores - Gúalc Cruz Rumi organizations EC-MAG-95185-CS-CQS / Component 2: Capacity Capacitación y Asistencia building for institutional Selección basada Ejecución 2020-03- 2020-03- 2020-04- 2020-04- 2020-04- 2021-04- Técnica para la Puesta en IBRD / 85150 stakeholders and Posterior en calificaciones Open - National 35,730.24 0.00 pendiente 02 16 06 13 21 16 Marcha, Plan Productivo y beneficiaries’ de consultores Ambiental - Putucay organizations EC-MAG-109156-CS- Component 2: Capacity QCBS / Capacitación y building for institutional Selección basada 2019-10- 2019-10- 2019-11- 2019-11- 2019-12- 2020-01- 2020-01- 2020-01- 2020-10- Asistencia Técnica para la IBRD / 85150 stakeholders and Posterior en calidad y Open - National 120,100.00 0.00 En ejecución 28 30 12 26 26 02 16 24 20 Puesta en Marcha, Plan beneficiaries’ costo Productivo y Ambiental - organizations Pinguili EC-MAG-94811-CS-CQS / Component 2: Capacity Capacitación y Asistencia building for institutional Selección basada 2019-10- 2019-10- 2019-11- 2019-11- 2019-12- 2019-11- 2019-12- 2020-01- 2019-12- 2020-06- 2020-09- Técnica para la Puesta en IBRD / 85150 stakeholders and Posterior en calificaciones Open - National 72,800.00 82,669.44 Firmado 28 29 11 05 16 22 21 06 29 23 24 Marcha, Plan Productivo y beneficiaries’ de consultores Ambiental - Estero Piedras organizations EC-MAG-94951-CS-CQS / Component 2: Capacity Capacitación y Asistencia building for institutional Selección basada 2019-06- 2019-10- 2019-06- 2019-11- 2019-07- 2019-11- 2019-07- 2020-01- 2019-08- 2020-07- 2020-05- Técnica para la Puesta en IBRD / 85150 stakeholders and Posterior en calificaciones Open - National 58,900.00 74,048.80 Firmado 03 29 17 05 23 21 29 06 06 08 02 Marcha, Plan Productivo y beneficiaries’ de consultores Ambiental - Huaquer organizations EC-MAG-94807-CS-CQS / Component 2: Capacity Capacitación y Asistencia building for institutional Selección basada 2019-03- 2019-10- 2019-04- 2019-11- 2019-05- 2019-05- 2019-05- 2020-02- Técnica para la Puesta en IBRD / 85150 stakeholders and Posterior en calificaciones Open - National 75,600.00 0.00 En ejecución 25 29 08 05 13 18 26 20 Marcha, Plan Productivo y beneficiaries’ de consultores ambiental - La Magdalena organizations EC-MAG-94810-CS-QCBS Component 2: Capacity Selección basada / Capacitación y Asistencia building for institutional Ejecución 2019-03- 2019-03- 2019-04- 2019-05- 2019-05- 2019-05- 2019-05- 2020-02- IBRD / 85150 Posterior en calidad y Open - National 176,300.00 0.00 Técnica , Plan Productivo y stakeholders and pendiente 04 19 02 02 09 23 31 25 costo Ambiental - La Paquita beneficiaries’ organizations EC-MAG-95151-CS-CQS / Component 2: Capacity Capacitación y Asistencia building for institutional Selección basada 2019-10- 2019-10- 2019-11- 2019-11- 2019-12- 2019-12- 2020-01- 2020-09- Técnica para la Puesta en IBRD / 85150 stakeholders and Posterior en calificaciones Open - National 83,600.00 0.00 En ejecución 28 29 11 05 18 25 02 28 Marcha, Plan Productivo y beneficiaries’ de consultores Ambiental - Y del Guineo organizations EC-MAG-109177-CS-CQS Component 2: Capacity / Capacitación y Asistencia building for institutional Selección basada 2019-10- 2019-10- 2019-11- 2019-11- 2019-12- 2019-11- 2019-12- 2019-12- 2020-01- 2019-12- 2020-09- Técnica para la Puesta en IBRD / 85150 stakeholders and Posterior en calificaciones Open - National 67,900.00 65,303.28 Firmado 28 29 11 05 18 22 25 12 02 13 28 Marcha, Plan Productivo y beneficiaries’ de consultores Ambiental - Nueva organizations Esperanza EC-MAG-109176-CS-CQS Component 2: Capacity / Capacitación y Asistencia building for institutional Selección basada 2019-10- 2019-10- 2019-11- 2019-11- 2019-12- 2019-12- 2020-01- 2020-09- Técnica para la Puesta en IBRD / 85150 stakeholders and Posterior en calificaciones Open - National 60,600.00 0.00 Cancelado 28 29 11 05 18 25 02 28 Marcha, Plan Productivo y beneficiaries’ de consultores Ambiental - Santa Ana organizations EC-MAG-109171-CS-CQS Component 2: Capacity / Capacitación y Asistencia building for institutional Selección basada 2019-10- 2019-10- 2019-11- 2019-11- 2019-12- 2019-11- 2019-12- 2019-12- 2020-01- 2019-12- 2020-09- Técnica para la Puesta en IBRD / 85150 stakeholders and Posterior en calificaciones Open - National 57,500.00 53,837.56 Firmado 28 29 11 05 18 13 25 12 02 13 28 Marcha, Plan Productivo y beneficiaries’ de consultores Ambiental - Sierra Morena organizations EC-MAG-109179-CS- Component 2: Capacity QCBS / Capacitación y building for institutional Selección basada 2019-10- 2019-10- 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2020-01- 2020-09- 2020-10- Asistencia Técnica para la IBRD / 85150 stakeholders and Posterior en calidad y Open - National 174,900.00 153,765.50 Firmado 28 29 11 05 25 28 25 13 01 27 15 14 23 21 19 Puesta en Marcha, Plan beneficiaries’ costo Productivo y Ambiental - organizations Toacaso EC-MAG-95155-CS-CQS / Component 2: Capacity Capacitación y Asistencia building for institutional Selección basada Técnica para la Puesta en 2019-10- 2019-10- 2019-11- 2019-11- 2019-12- 2019-11- 2019-12- 2020-01- 2020-01- 2020-06- 2020-09- IBRD / 85150 stakeholders and Posterior en calificaciones Open - National 61,600.00 71,021.44 Firmado Marcha, Plan Productivo y 28 29 11 05 18 21 25 06 02 23 28 beneficiaries’ de consultores Ambiental - El Verde organizations Pacayunga Page 6 EC-MAG-146609-CS- QCBS / Servicio para el levantamiento topográfico Component 2: Capacity georeferenciado, Catastral building for institutional Selección basada 2019-11- 2019-12- 2019-12- 2020-01- 2020-01- 2020-01- 2020-02- 2020-03- 2020-07- y De Infraestructura IBRD / 85150 stakeholders and Posterior en calidad y Open - National 224,000.00 0.00 Cancelado 25 09 10 14 19 24 03 03 31 Hidráulica Existente de los beneficiaries’ costo Subproyectos Tintales, organizations Quinsaloma (Gracias a Dios), Unión Carchense, El Timbre, Guanazan EC-MAG-136076-CS-CQS / Fiscalización - Obra: Implementación de Microreservorios con Riego Component 1: Investments Selección basada 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- 2019-11- 2020-03- Parcelario Tecnificado por IBRD / 85150 for climate-smart sub- Posterior en calificaciones Open - National 61,927.88 0.00 Cancelado 01 09 15 15 05 11 18 17 Aspersión y Goteo en la projects de consultores "Junta de Aguas de Riego de la Acequia del Pueblo de Pimampiro EC-MAG-136530-CS- QCBS / Fiscalización - Component 1: Investments Selección basada 2019-10- 2019-10- 2019-10- 2019-11- 2019-12- 2019-12- 2019-12- 2020-12- Obra: Implementación de IBRD / 85150 for climate-smart sub- Posterior en calidad y Open - National 120,103.69 0.00 Cancelado 07 22 31 30 07 21 29 23 Riego Tecnificado en el projects costo Subproyecto Cerezal - Bellavista EC-MAG-94802-CS-QCBS Component 2: Capacity / Capacitación y Asistencia building for institutional Selección basada 2020-02- 2020-03- 2020-03- 2020-04- 2020-04- 2020-05- 2020-05- 2021-05- Técnica para la Puesta en IBRD / 85150 stakeholders and Posterior en calidad y Open - National 179,956.00 0.00 Cancelado 24 10 25 24 29 12 21 16 Marcha, Plan Productivo y beneficiaries’ costo Ambiental - Píllaro Sur organizations EC-MAG-189664-CS-LCS Selección basada / Servicio de Auditoría Component 3: Project 2020-11- 2020-10- 2020-11- 2020-12- 2021-01- 2021-01- 2021-02- 2021-03- 2021-08- IBRD / 85150 Posterior en el menor Open - National 56,000.00 0.00 En ejecución Financiera para el ejercicio Management 09 21 24 14 13 28 17 22 19 costo económico 2020 EC-MAG-205987-CS- Component 1: Investments Selección basada QCBS / ESTUDIOS Y Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-02- 2021-02- 2021-03- 2021-09- COFN / C1410 for climate-smart sub- Previa en calidad y Open - National 560,000.00 0.00 DISEÑOS A NIVEL pendiente 01 16 30 27 03 13 18 14 projects costo DEFINITIVO DEL SUBPROYECTO PÍLLARO SUR 2 INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EC-MAGAP-8176-093 / Component 1: Investments Supervisión Asociación 2016-12- 2016-12- 2017-02- 2017-03- 2017-02- 2017-03- 2017-03- 2017-04- 2017-07- IBRD / 85150 for climate-smart sub- Posterior Individual Open 7,401.36 7,401.36 Firmado Campesina 15 de 09 08 17 16 17 16 04 07 02 projects Diciembre, Campozano EC-MAGAP-8176-094 / Component 1: Investments 2016-12- 2017-02- 2017-02- 2017-03- 2017-02- 2017-04- 2017-03- 2017-04- 2017-07- Supervisión Directorio de IBRD / 85150 for climate-smart sub- Posterior Individual Open 16,630.56 16,630.56 Rescindido 23 23 10 16 10 04 10 20 08 Agua del canal Palo projects Marcado EC-MAGAP-8176-095 / Component 1: Investments 2016-12- 2016-12- 2017-02- 2017-04- 2017-02- 2017-04- 2017-03- 2017-04- 2017-07- 2018-12- Supervisión - Asociación IBRD / 85150 for climate-smart sub- Posterior Individual Open 16,873.11 16,873.11 Finalizado 30 30 17 26 17 27 15 27 13 06 Santa Cecilia de Pucalpa projects EC-MAGAP-8176-096 / Supervisión - Asociación de Component 1: Investments trabajadores agrícolas, 2016-12- 2016-12- 2017-02- 2017-05- 2017-03- 2017-03- 2017-03- 2017-04- 2017-09- IBRD / 85150 for climate-smart sub- Posterior Individual Open 26,877.86 27,877.86 Firmado autónomos comerciantes, 30 30 17 16 10 16 15 03 11 projects exportadores “Voluntad de Dios" EC-MAGAP-8176-097 / Supervisión - Asociación de Component 1: Investments 2016-12- 2016-12- 2017-02- 2017-04- 2017-03- 2017-04- 2017-03- 2017-04- 2017-08- 2018-07- desarrollo integral de la IBRD / 85150 for climate-smart sub- Posterior Individual Open 19,124.88 19,124.88 Finalizado 30 30 17 03 04 04 15 12 12 10 comunidad de Cutahua, projects Simiatug EC-MAGAP-8176-098 / Component 1: Investments Supervisión - Tecnificacion 2016-12- 2016-12- 2017-02- 2017-04- 2017-02- 2017-04- 2017-03- 2017-04- 2017-07- IBRD / 85150 for climate-smart sub- Posterior Individual Open 10,532.40 10,532.40 Firmado del sistema de riego Zhilla 23 23 10 03 25 04 08 07 06 projects San Pedro EC-MAGAP-8176-099 / Component 1: Investments Supervisión - Junta de 2016-12- 2017-02- 2017-01- 2017-03- 2017-02- 2017-03- 2017-03- 2017-04- 2017-07- 2018-08- IBRD / 85150 for climate-smart sub- Posterior Individual Open 12,984.05 12,984.05 Finalizado Regantes del sistema de 09 23 27 16 21 20 09 05 07 24 projects riego La Era EC-MAGAP-8176-071 / Component 3: Project 2016-11- 2017-04- 2017-02- 2017-05- 2017-02- 2017-05- 2017-02- 2017-05- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 28,193.62 En ejecución Técnico Hidraúlico Zona 2 Management 02 19 15 09 28 11 28 15 31 EC-MAGAP-8176-060 / Component 3: Project 2016-05- 2016-07- 2016-07- 2016-12- 2016-07- 2016-12- 2016-07- 2016-12- 2017-12- IBRD / 85150 Posterior Individual Open 56,329.22 54,908.51 En ejecución Especialista Ambiental UGP Management 25 04 06 01 16 01 21 01 31 EC-MAGAP-8176-072 / Component 3: Project 2016-11- 2016-12- 2017-02- 2017-03- 2017-02- 2017-03- 2017-02- 2017-04- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 32,077.05 Firmado Técnico Agrícola Zona 2 Management 02 01 15 29 15 30 28 07 31 EC-MAGAP-8176-073 / Component 3: Project 2016-11- 2016-12- 2017-02- 2017-03- 2017-02- 2017-03- 2017-02- 2017-04- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 32,077.05 Firmado Técnico Social Zona 2 Management 02 22 15 29 15 30 28 07 31 EC-MAGAP-8176-078 / Component 3: Project 2016-11- 2016-12- 2017-02- 2017-05- 2017-02- 2017-05- 2017-02- 2017-05- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 28,193.62 Firmado Técnico Agrícola Zona 4 Management 02 22 15 09 15 11 28 15 31 EC-MAGAP-8176-079 / Component 3: Project 2016-11- 2016-12- 2017-02- 2017-05- 2017-02- 2017-05- 2017-02- 2017-05- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 17,549.14 Firmado Técnico Social Zona 4 Management 02 22 15 09 15 11 28 15 31 EC-MAGAP-8176-081 / Component 3: Project 2016-11- 2016-12- 2017-02- 2017-05- 2017-02- 2017-05- 2017-02- 2017-05- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 28,193.62 Firmado Técnico Agrícola Zona 5 Management 02 22 15 09 15 11 28 15 31 EC-MAGAP-8176-082 / Component 3: Project 2016-11- 2017-03- 2017-02- 2017-05- 2017-02- 2017-05- 2017-02- 2017-05- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 20,210.26 Firmado Técnico Social Zona 5 Management 02 09 15 09 15 11 28 15 31 EC-MAGAP-8176-083 / Component 3: Project 2016-11- 2016-12- 2017-02- 2017-03- 2017-02- 2017-03- 2017-02- 2017-05- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 28,193.62 Firmado Técnico Hidraúlico Zona 6 Management 02 22 15 29 15 30 28 15 31 EC-MAGAP-8176-084 / Component 3: Project 2016-11- 2016-12- 2017-02- 2017-03- 2017-02- 2017-03- 2017-02- 2017-05- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 28,193.62 Firmado Técnico Agrícola Zona 6 Management 02 22 15 29 15 30 28 15 31 EC-MAGAP-8176-085 / Component 3: Project 2016-11- 2016-12- 2017-02- 2017-05- 2017-02- 2017-05- 2017-02- 2017-05- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 12,226.90 Firmado Técnico Social Zona 6 Management 02 22 15 09 15 11 28 15 31 EC-MAGAP-8176-086 / Component 3: Project 2016-11- 2016-12- 2017-02- 2017-05- 2017-02- 2017-05- 2017-02- 2017-05- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 28,193.62 Firmado Técnico Hidraúlico Zona 7 Management 02 22 15 09 15 11 28 15 31 EC-MAGAP-8176-087 / Component 3: Project 2016-11- 2016-12- 2017-02- 2017-05- 2017-02- 2017-05- 2017-02- 2017-05- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 28,193.62 Firmado Técnico Agrícola Zona 7 Management 02 22 15 09 15 11 28 15 31 EC-MAGAP-8176-088 / Component 3: Project 2016-11- 2016-12- 2017-02- 2017-05- 2017-02- 2017-05- 2017-02- 2017-05- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 28,193.62 En ejecución Técnico Social Zona 7 Management 02 22 15 09 15 11 28 11 31 EC-MAGAP-8176-055 / 1 Component 3: Project 2016-05- 2016-04- 2016-07- 2016-09- 2016-07- 2016-09- 2016-07- 2016-09- 2017-12- IBRD / 85150 Posterior Individual Open 56,329.22 58,981.89 En ejecución Especialista Hidráulico UGP Management 25 16 06 01 16 01 21 01 31 EC-MAGAP-8176-056 / 1 Component 3: Project 2016-05- 2016-07- 2016-07- 2016-08- 2016-07- 2016-08- 2016-07- 2016-08- 2017-12- IBRD / 85150 Posterior Individual Open 56,329.22 60,547.05 En ejecución Especialista Agrícola UGP Management 25 04 06 16 16 16 21 16 31 EC-MAGAP-8176-057 / 1 Component 3: Project 2016-05- 2016-04- 2016-07- 2016-08- 2016-07- 2016-10- 2016-07- 2016-10- 2017-12- IBRD / 85150 Posterior Individual Open 56,329.22 54,912.47 En ejecución Especialista Ambiental UGP Management 25 20 06 11 16 10 21 10 31 EC-MAGAP-8176-058 / 1 Component 3: Project 2016-05- 2016-04- 2016-07- 2016-08- 2016-07- 2016-08- 2016-07- 2016-08- 2017-12- IBRD / 85150 Posterior Individual Open 56,329.22 57,471.64 En ejecución Especialista Social UGP Management 25 19 06 16 16 16 21 16 31 EC-MAGAP-8176-059 / 1 Component 3: Project 2016-05- 2016-07- 2016-07- 2016-08- 2016-07- 2016-08- 2016-07- 2016-08- 2017-12- Especialista en IBRD / 85150 Posterior Individual Open 56,329.22 60,547.05 En ejecución Management 25 04 06 16 16 16 21 16 31 Agronegocios UGP EC-MAGAP-8176-090 / Component 1: Investments Supervisión Asociación de 2016-12- 2017-02- 2017-01- 2017-03- 2017-01- 2017-03- 2017-03- 2017-04- 2017-07- IBRD / 85150 for climate-smart sub- Posterior Individual Open 14,869.21 14,869.21 Firmado Productores Agrícolas San 09 23 27 16 27 20 09 03 07 projects Rafael EC-MAGAP-8176-092 / Component 1: Investments 2016-12- 2016-12- 2017-02- 2017-05- 2017-02- 2017-03- 2017-03- 2017-04- 2017-08- Supervisión Cooperativa IBRD / 85150 for climate-smart sub- Posterior Individual Open 14,549.64 14,549.63 Firmado 09 08 17 16 17 20 04 30 11 Agropecuaria el Marco, projects Pintag EC-MAGAP-8545-CS-INDV Component 3: Project 2017-02- 2017-09- 2017-03- 2017-07- 2017-03- 2017-10- 2017-03- 2017-10- 2017-12- IBRD / 85150 Posterior Individual Open 31,294.03 15,377.05 Firmado / Especialista de Management 26 25 11 17 14 31 15 30 31 Capacitación EC-MAGAP-32740-CS- Component 2: Capacity INDV / Asistencia técnica y building for institutional capacitación para la puesta Ejecución 2017-10- 2017-11- 2017-11- 2017-11- 2018-01- IBRD / 85150 stakeholders and Posterior Individual Direct 12,073.88 0.00 en marcha del sistema de pendiente 27 01 03 06 05 beneficiaries’ riego - Junta de Aguas de organizations Riego Palmar Grande EC-MAGAP-32742-CS- Component 2: Capacity INDV / Asistencia técnica y building for institutional capacitación para la puesta 2017-10- 2017-12- 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2018-01- IBRD / 85150 stakeholders and Posterior Individual Direct 5,521.88 5,521.88 Firmado en marcha del sistema de 27 15 01 03 18 06 19 05 beneficiaries’ riego - Asociación de organizations Productores Agrícolas San Rafael EC-MAGAP-32744-CS- Component 2: Capacity INDV / Asistencia técnica y building for institutional capacitación para la puesta 2017-10- 2017-12- 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2018-01- IBRD / 85150 stakeholders and Posterior Individual Direct 11,637.08 11,637.08 Firmado en marcha del sistema de 27 15 01 03 18 06 19 05 beneficiaries’ riego - Asociación Santa organizations Cecilia de Pucalpa EC-MAGAP-32746-CS- Component 2: Capacity INDV / Asistencia técnica y building for institutional capacitación para la puesta 2017-10- 2017-12- 2017-11- 2017-11- 2017-12- 2017-11- 2018-01- IBRD / 85150 stakeholders and Posterior Individual Direct 12,073.88 0.00 En ejecución en marcha del sistema de 27 15 01 03 18 06 05 beneficiaries’ riego - Cooperativa organizations Agropecuaria El Marco, Pintag EC-MAGAP-32747-CS- INDV / Asistencia técnica y Component 2: Capacity capacitación para la puesta building for institutional 2017-10- 2017-12- 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2018-01- en marcha del sistema de IBRD / 85150 stakeholders and Posterior Individual Direct 12,073.88 12,073.88 Firmado 27 15 01 03 18 06 19 05 riego - Asociación de beneficiaries’ desarrollo integral de la organizations comunidad de Cutahua, Simiatug EC-MAGAP-32748-CS- INDV / Asistencia técnica y Component 2: Capacity capacitación para la puesta building for institutional en marcha del sistema de Ejecución 2017-10- 2017-11- 2017-11- 2017-11- 2018-01- IBRD / 85150 stakeholders and Posterior Individual Direct 12,292.28 0.00 riego - Asociación de pendiente 27 01 03 06 05 beneficiaries’ trabajadores agrícolas, organizations autónomos comerciantes, exportadores "Voluntad de Dios" EC-MAGAP-32750-CS- Component 2: Capacity INDV / Asistencia técnica y building for institutional capacitación para la puesta 2017-10- 2017-12- 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2018-01- IBRD / 85150 stakeholders and Posterior Individual Direct 11,637.08 11,637.08 Firmado en marcha del sistema de 27 15 01 03 18 06 19 05 beneficiaries’ riego - Asociación organizations Campesina 15 de Diciembre EC-MAGAP-32751-CS- Component 2: Capacity INDV / Asistencia técnica y building for institutional 2017-10- 2017-12- 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2018-01- capacitación para la puesta IBRD / 85150 stakeholders and Posterior Individual Direct 11,637.08 11,637.08 Firmado 27 15 01 03 18 06 19 05 en marcha del sistema de beneficiaries’ riego - Zhilla San Pedro organizations EC-MAGAP-32753-CS- Component 2: Capacity INDV / Asistencia técnica y building for institutional capacitación para la puesta 2017-10- 2017-12- 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2018-01- IBRD / 85150 stakeholders and Posterior Individual Direct 12,073.88 12,073.88 Firmado en marcha del sistema de 27 15 01 03 18 06 19 05 beneficiaries’ riego - Junta de Regantes organizations del sistema de riego La Era Page 7 EC-MAGAP-32754-CS- Component 2: Capacity INDV / Asistencia técnica y building for institutional capacitación para la puesta 2017-10- 2017-12- 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- 2018-01- IBRD / 85150 stakeholders and Posterior Individual Direct 11,418.68 11,418.68 Firmado en marcha del sistema de 27 15 01 03 18 06 19 05 beneficiaries’ riego - Directorio de Agua organizations del canal Palo Marcado EC-MAGAP-8176-101 / Component 1: Investments Supervisión - Asociación 2017-02- 2017-04- 2017-04- 2017-05- 2017-10- IBRD / 85150 for climate-smart sub- Posterior Individual Open 19,094.76 0.00 Cancelado Agropecuaria Santa Clara 23 13 24 08 05 projects de Tolontag EC-MAGAP-8176-100 / Component 1: Investments 2017-03- 2017-05- 2017-05- 2017-06- 2017-11- Supervisión - Asociación de IBRD / 85150 for climate-smart sub- Posterior Individual Open 18,400.00 0.00 Cancelado 20 08 19 02 29 Agricultores Huaquer projects EC-MAGAP-8176-106 / Supervisiones en 34 Component 1: Investments 2017-02- 2017-04- 2017-04- 2017-05- 2017-11- Microreservorios en la IBRD / 85150 for climate-smart sub- Posterior Individual Open 25,231.95 0.00 Cancelado 23 13 24 08 04 parroquia Ingapirca-Coop. projects Vendeleche EC-MAGAP-8176-107 / Component 1: Investments Supervisión en 2017-06- 2017-08- 2017-08- 2017-09- 2018-03- IBRD / 85150 for climate-smart sub- Posterior Individual Open 60,664.02 0.00 Cancelado microreservorios primera 15 03 24 07 06 projects convocatoria EC-MAGAP-8176-089 / Supervisión de Component 1: Investments aproximadamente 14 2017-06- 2017-08- 2017-08- 2017-09- 2018-02- IBRD / 85150 for climate-smart sub- Posterior Individual Open 278,401.90 0.00 Cancelado subproyectos de riego 01 15 15 01 28 projects parcelario de la primera convocatoria EC-MAGAP-8176-104 / Component 1: Investments 2017-02- 2017-04- 2017-04- 2017-05- 2017-09- Supervisión - Tecnificacion IBRD / 85150 for climate-smart sub- Posterior Individual Open 28,502.01 0.00 Cancelado 23 13 24 08 05 del sistema de riego projects Putucay EC-MAGAP-8176-105 / Component 1: Investments Supervisión - Tecnificación 2017-02- 2017-04- 2017-04- 2017-05- 2017-11- IBRD / 85150 for climate-smart sub- Posterior Individual Open 23,589.12 0.00 Cancelado del sistema de riego Luis 23 13 24 08 04 projects Cordero Etapa 1 EC-MAGAP-32990-CS- Component 3: Project Selección directa 2017-10- 2017-11- 2017-11- 2017-11- 2018-03- IBRD / 85150 Previa Direct 56,000.00 0.00 En ejecución CDS / Auditoría Financiera Management de consultores 27 15 29 27 27 II EC-MAGAP-36882-CS- Component 3: Project 2017-11- 2017-10- 2017-11- 2017-11- 2017-11- 2017-12- 2017-11- 2017-12- IBRD / 85150 Posterior Individual Direct 2,661.12 10,644.48 Firmado INDV / Técnico Social Zona Management 24 24 28 29 30 01 30 31 6 EC-MAGAP-37387-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- IBRD / 85150 Posterior Individual Direct 40,602.24 5,622.24 Firmado INDV / Técnico Social - Management 28 28 14 29 19 04 01 06 31 Zona 2 EC-MAGAP-37388-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- INDV / IBRD / 85150 Posterior Individual Direct 40,602.24 5,622.24 Firmado Management 28 28 14 29 19 04 01 06 31 TécnicoAgropecuario y de Comercialización - Zona 2 EC-MAGAP-37389-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- IBRD / 85150 Posterior Individual Direct 40,602.24 5,622.24 Firmado INDV / Técnico Hidráulico - Management 28 28 14 29 19 04 01 06 31 Zona 2 EC-MAGAP-37390-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- INDV / Técnico IBRD / 85150 Posterior Individual Direct 40,602.24 6,072.24 Firmado Management 28 28 14 29 19 04 01 06 31 Agropecuario y de Comercialización - Zona 4 EC-MAGAP-37392-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- IBRD / 85150 Posterior Individual Direct 40,602.24 6,072.24 Firmado INDV / Técnico Hidráulico - Management 28 28 14 29 19 04 01 06 31 Zona 4 EC-MAGAP-37393-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- INDV / Técnico IBRD / 85150 Posterior Individual Direct 40,602.24 9,108.36 Firmado Management 28 28 14 29 19 04 01 06 31 Agropecuario y de Comercialización - Zona 5 EC-MAGAP-37396-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- INDV / Técnico IBRD / 85150 Posterior Individual Direct 40,602.24 5,922.24 Firmado Management 28 28 14 29 19 04 01 06 31 Agropecuario y de Comercialización - Zona 6 EC-MAGAP-37397-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- IBRD / 85150 Posterior Individual Direct 40,602.24 8,883.36 Firmado INDV / Técnico Hidráulico - Management 28 28 14 29 19 04 01 06 31 Zona 6 EC-MAGAP-37398-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- IBRD / 85150 Posterior Individual Direct 40,602.24 5,922.24 Firmado INDV / Técnico Social - Management 28 28 14 29 19 04 01 06 31 Zona 6 EC-MAGAP-37399-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- IBRD / 85150 Posterior Individual Direct 40,602.24 6,072.24 Firmado INDV / Técnico Social - Management 28 28 14 29 19 04 01 06 31 Zona 7 EC-MAGAP-37400-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- INDV / Técnico IBRD / 85150 Posterior Individual Direct 40,602.24 6,072.24 Firmado Management 28 28 14 29 19 04 01 06 31 Agropecuario y de Comercialización - Zona 7 EC-MAGAP-37401-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- IBRD / 85150 Posterior Individual Direct 40,602.24 6,072.24 Firmado INDV / Técnico Hidráulico - Management 28 28 14 29 19 04 01 06 31 Zona 7 EC-MAGAP-37402-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- COFN / C1410 Posterior Individual Direct 40,602.24 5,622.24 Firmado INDV / Técnico Hidráulico - Management 28 28 14 29 19 04 01 06 31 Zona 1 EC-MAGAP-37405-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- COFN / C1410 Posterior Individual Direct 40,602.24 5,622.24 Firmado INDV / Técnico Hidráulico - Management 28 28 14 29 19 04 01 06 31 Zona 3 EC-MAGAP-37407-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- INDV / Técnico COFN / C1410 Posterior Individual Direct 40,602.24 5,622.24 Firmado Management 28 28 14 29 19 04 01 06 31 Agropecuario y de Comercialización - Zona 3 EC-MAGAP-37408-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- 2019-02- IBRD / 85150 Posterior Individual Direct 41,126.40 33,753.68 Finalizado INDV / Especialista Management 28 28 14 29 19 04 01 06 31 15 Hidráulico UGP EC-MAGAP-37409-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-12- IBRD / 85150 Posterior Individual Direct 41,126.40 0.00 Cancelado INDV / Especialista Social Management 28 28 14 29 19 13 01 31 UGP EC-MAGAP-37410-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- 2019-02- INDV / Especialista IBRD / 85150 Posterior Individual Direct 41,126.40 33,753.68 Finalizado Management 28 28 14 29 19 04 01 06 31 15 Ambiental 1 UGP EC-MAGAP-37411-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- 2019-02- IBRD / 85150 Posterior Individual Direct 41,126.40 33,753.68 Finalizado INDV / Especialista Agrícola Management 28 28 14 28 19 04 01 06 31 15 UGP EC-MAGAP-37412-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- 2019-02- INDV / Especialista IBRD / 85150 Posterior Individual Direct 41,126.40 33,753.68 Finalizado Management 28 28 14 29 19 04 01 09 31 15 Ambiental 2 UGP EC-MAGAP-37413-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- 2019-02- INDV / Especialista en IBRD / 85150 Posterior Individual Direct 41,126.40 33,753.68 Finalizado Management 28 28 14 29 19 04 01 06 31 15 Agronegocios UGP EC-MAGAP-37414-CS- Component 3: Project 2017-11- 2018-03- 2017-12- 2018-03- 2017-12- 2018-04- 2018-01- 2018-04- 2018-12- 2019-02- INDV / Especialista de IBRD / 85150 Posterior Individual Direct 41,126.40 33,753.69 Finalizado Management 28 28 14 29 19 04 01 06 31 15 Capacitación UGP EC-MAGAP-53287-CS- Component 3: Project Ejecución 2016-11- 2017-02- 2017-02- 2017-02- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 0.00 INDV / Técnico Hidraúlico Management pendiente 02 15 15 28 31 Zona 4 EC-MAG-64103-CS-INDV Component 3: Project 2018-05- 2018-05- 2018-05- 2018-05- 2018-05- 2018-06- 2018-06- 2018-06- 2018-12- 2019-02- / CONSULTOR IBRD / 85150 Posterior Individual Limited 26,252.86 26,252.86 Finalizado Management 25 29 28 29 30 07 01 07 31 15 ESPECIALISTA SOCIAL EC-MAG-65890-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-07- 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- 2018-12- COFN / C1410 Posterior Individual Open 17,916.72 11,919.48 Firmado / Técnico Social Carchi Management 18 21 09 27 10 02 12 10 31 EC-MAG-65893-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-07- 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- 2018-12- IBRD / 85150 Posterior Individual Open 20,016.72 19,791.72 Firmado / Técnico Social Manabí Management 18 19 09 27 10 02 12 10 31 EC-MAG-65896-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-07- 2018-06- 2018-07- 2018-07- 2018-07- 2018-07- 2018-12- IBRD / 85150 Posterior Individual Open 18,336.72 18,051.72 Firmado / Técnico Social Loja Management 18 21 09 27 10 02 12 10 31 EC-MAG-65897-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-12- COFN / C1410 Posterior Individual Direct 19,302.84 19,227.84 Firmado / Técnico Hidráulico Management 08 11 11 11 12 12 12 13 31 Imbabura EC-MAG-65898-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-12- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 19,302.84 19,302.84 Firmado Management 08 11 11 11 12 12 12 13 31 de Comercialización Pichincha EC-MAG-65899-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-12- IBRD / 85150 Posterior Individual Direct 19,302.84 19,302.84 Firmado / Técnico Hidráulico Management 08 11 11 11 12 12 12 13 31 Pichincha EC-MAG-65900-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-12- IBRD / 85150 Posterior Individual Direct 19,302.84 19,201.84 Firmado / Técnico Social Pichincha Management 08 11 11 11 12 12 12 13 31 EC-MAG-65901-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-12- COFN / C1410 Posterior Individual Direct 19,302.84 10,944.48 Firmado / Técnico Hidráulico Management 08 11 11 11 12 12 12 13 31 Cotopaxi EC-MAG-65902-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-12- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 23,277.84 3,261.12 Firmado Management 08 11 11 11 12 12 12 13 31 de Comercialización Manabí EC-MAG-65903-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-12- IBRD / 85150 Posterior Individual Direct 23,277.84 3,261.12 Firmado / Técnico Hidráulico Management 08 11 11 11 12 12 12 13 31 Manabí EC-MAG-65904-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-12- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 19,302.84 19,302.84 Firmado Management 08 11 11 11 12 12 12 13 31 de Comercialización Bolivar EC-MAG-65905-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-07- 2018-12- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 21,197.84 21,197.84 Firmado Management 08 11 11 11 12 12 12 10 31 de Comercialización Azuay EC-MAG-65906-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-12- IBRD / 85150 Posterior Individual Direct 21,197.84 21,197.84 Firmado / Técnico Hidráulico Azuay Management 08 11 11 11 12 12 12 13 31 EC-MAG-65907-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-12- IBRD / 85150 Posterior Individual Direct 21,197.84 21,197.84 Firmado / Técnico Social Azuay Management 08 11 11 11 12 12 12 13 31 EC-MAG-65908-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-12- IBRD / 85150 Posterior Individual Direct 21,297.84 21,297.84 Firmado / Técnico Hidráulico Loja Management 08 11 11 11 12 12 12 13 31 EC-MAG-65909-CS-INDV Component 3: Project 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-06- 2018-12- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 21,237.84 21,237.84 Firmado Management 08 11 11 11 12 12 12 13 31 de Comercialización El Oro EC-MAGAP-37330-CS- INDV / Fiscalización de obra de riego - Component 1: Investments 2018-11- 2018-11- 2018-11- 2018-12- 2019-04- Subproyecto: IBRD / 85150 for climate-smart sub- Posterior Individual Open 15,182.97 0.00 Cancelado 06 27 30 06 05 Implementación de riego projects tecnificado a nivel parcelario en el sistema de riego El Verde - Pacayunga. EC-MAGAP-37276-CS- INDV / Fiscalización - Component 1: Investments Subproyecto: 2018-11- 2018-11- 2018-11- 2018-12- 2019-04- COFN / C1410 for climate-smart sub- Posterior Individual Open 21,073.07 0.00 Cancelado Implementación de riego 06 27 30 06 05 projects por aspersión en la Asociación Agropecuaria Manuel Freile Barba "La Magdalena". EC-MAGAP-37332-CS- INDV / Fiscalización - Component 1: Investments Subproyecto: 2018-11- 2018-11- 2018-11- 2018-12- 2019-05- IBRD / 85150 for climate-smart sub- Posterior Individual Open 24,191.62 0.00 Cancelado Implementación del 06 27 30 06 05 projects sistema de riego parcelario por aspersión para la "Comuna Jurídica La Libertad". EC-MAG-74171-CS-INDV / Fiscalización - Component 1: Investments 2018-11- 2018-11- 2018-11- 2018-12- 2019-05- Subproyecto: COFN / C1410 for climate-smart sub- Posterior Individual Open 25,738.66 0.00 Cancelado 06 27 30 06 05 Implementación de riego projects parcelario tecnificado en el predio Sucuso Page 8 EC-MAGAP-37328-CS- Component 1: Investments 2018-05- 2018-07- 2018-07- 2018-07- 2018-11- INDV / Supervisión de obra IBRD / 85150 for climate-smart sub- Posterior Individual Open 20,263.99 0.00 Cancelado 30 06 13 29 26 de riego - Tolontag projects EC-MAGAP-37337-CS- Component 1: Investments 2018-07- 2018-09- 2018-09- 2018-09- 2019-01- INDV / Supervisión de obra IBRD / 85150 for climate-smart sub- Posterior Individual Open 22,377.60 0.00 Cancelado 31 06 13 29 27 de riego - Jesús María projects EC-MAGAP-37279-CS- Component 1: Investments 2017-12- 2018-01- 2018-02- 2018-02- 2018-08- INDV / Supervisión de obra IBRD / 85150 for climate-smart sub- Posterior Individual Open 26,509.07 0.00 Cancelado 22 28 04 20 19 de riego - Luis Cordero projects EC-MAGAP-37326-CS- Component 1: Investments 2017-12- 2018-01- 2018-02- 2018-02- 2018-06- INDV / Supervisión de obra IBRD / 85150 for climate-smart sub- Posterior Individual Open 31,290.36 0.00 Cancelado 20 26 02 18 18 de riego - Putucay projects EC-MAGAP-37336-CS- Component 1: Investments 2018-02- 2018-03- 2018-03- 2018-04- 2018-08- INDV / Supervisión de obra IBRD / 85150 for climate-smart sub- Posterior Individual Open 28,425.60 0.00 Cancelado 15 24 31 16 14 de riego - La Belgica projects EC-MAGAP-37333-CS- Component 1: Investments 2018-08- 2018-10- 2018-10- 2018-10- 2019-02- INDV / Supervisión de obra IBRD / 85150 for climate-smart sub- Posterior Individual Open 16,934.40 0.00 Cancelado 30 06 13 29 26 de riego - Milagro projects EC-MAGAP-33018-CS- CDS / Estudios de Component 1: Investments factibilidad y diseños Selección directa 2017-10- 2017-11- 2017-11- 2018-03- IBRD / 85150 for climate-smart sub- Previa Direct 72,866.08 0.00 Cancelado definitivos integrales de de consultores 27 15 27 27 projects subproyectos: riego, social y ambiental para la Provincia de Chimborazo EC-MAGAP-33019-CS- CDS / Estudios de Component 1: Investments factibilidad y diseños Selección directa 2017-10- 2017-11- 2017-11- 2018-03- IBRD / 85150 for climate-smart sub- Previa Direct 95,133.92 0.00 Cancelado definitivos integrales de de consultores 27 15 27 27 projects subproyectos: riego, social y ambiental para las Provincias Cotopaxi y Azuay EC-MAGAP-37395-CS- Component 3: Project 2017-11- 2017-12- 2017-12- 2018-01- 2018-12- IBRD / 85150 Posterior Individual Open 40,602.24 0.00 Cancelado INDV / Técnico Hidráulico - Management 24 20 22 01 31 Zona 5 EC-MAG-65889-CS-INDV Component 3: Project 2018-06- 2018-07- 2018-07- 2018-07- 2018-12- COFN / C1410 Posterior Individual Open 17,916.72 0.00 Cancelado / Técnico Hidráulico Carchi Management 18 09 10 12 31 EC-MAGAP-38879-CS- Component 3: Project 2017-11- 2017-11- 2017-11- 2017-12- 2017-12- INDV / Asistente IBRD / 85150 Posterior Individual Direct 733.00 0.00 Cancelado Management 30 30 30 01 31 Administrativo Planta Central EC-MAGAP-38881-CS- INDV / Especialista de Component 3: Project 2017-11- 2017-11- 2017-11- 2017-12- 2017-12- IBRD / 85150 Posterior Individual Direct 1,676.00 0.00 Cancelado Procesos y Gestión de Sub- Management 30 30 30 01 31 proyectos Planta Central EC-MAGAP-8176-080 / Component 3: Project 2016-11- 2017-02- 2017-02- 2017-02- 2017-12- IBRD / 85150 Posterior Individual Open 27,086.40 0.00 Cancelado Técnico Hidraúlico Zona 5 Management 02 15 15 28 31 EC-MAGAP-38872-CS- Component 3: Project 2017-11- 2017-11- 2017-11- 2017-12- 2017-12- INDV / Analista IBRD / 85150 Posterior Individual Direct 817.00 0.00 Cancelado Management 30 30 30 01 31 Administrativo Financiero Zona 2 EC-MAGAP-37394-CS- Component 3: Project 2017-11- 2017-12- 2017-12- 2018-01- 2018-12- IBRD / 85150 Posterior Individual Direct 40,602.24 0.00 Cancelado INDV / Técnico Social - Management 28 14 19 01 31 Zona 5 EC-MAGAP-37403-CS- Component 3: Project 2017-11- 2017-12- 2017-12- 2018-01- 2018-12- COFN / C1410 Posterior Individual Direct 40,602.24 0.00 Cancelado INDV / Técnico Social - Management 28 14 19 01 31 Zona 1 EC-MAGAP-37404-CS- Component 3: Project 2017-11- 2017-12- 2017-12- 2018-01- 2018-12- INDV / Técnico COFN / C1410 Posterior Individual Open 40,602.24 0.00 Cancelado Management 24 20 22 01 31 Agropecuario y de Comercialización - Zona 1 EC-MAGAP-37406-CS- Component 3: Project 2017-11- 2017-12- 2017-12- 2018-01- 2018-12- COFN / C1410 Posterior Individual Direct 40,602.24 0.00 Cancelado INDV / Técnico Social - Management 28 14 19 01 31 Zona 3 EC-MAGAP-38880-CS- Component 3: Project 2017-11- 2017-11- 2017-11- 2017-12- 2017-12- INDV / Especialista de IBRD / 85150 Posterior Individual Direct 1,676.00 0.00 Cancelado Management 30 30 30 01 31 Planificación Planta Central EC-MAG-65892-CS-INDV Component 3: Project 2018-06- 2018-07- 2018-07- 2018-07- 2018-12- / Técnico Hidráulico COFN / C1410 Posterior Individual Open 17,916.72 0.00 Cancelado Management 18 09 10 12 31 Chimborazo EC-MAGAP-32571-CS- Component 3: Project 2017-10- 2017-11- 2017-11- 2017-11- 2018-01- CDS / Ingeniero Civil - IBRD / 85150 Posterior Individual Direct 9,407.68 0.00 Cancelado Management 27 01 03 06 05 Especialista Hidráulico 1 EC-MAGAP-32574-CS- Component 3: Project 2017-10- 2017-11- 2017-11- 2017-11- 2018-01- INDV / Ingeniero Civil - IBRD / 85150 Posterior Individual Direct 9,407.68 0.00 Cancelado Management 27 01 03 06 05 Especialista Hidráulico 2 EC-MAGAP-37391-CS- Component 3: Project 2017-11- 2017-12- 2017-12- 2018-01- 2018-12- IBRD / 85150 Posterior Individual Open 40,602.24 0.00 Cancelado INDV / Técnico Social - Management 24 20 22 01 31 Zona 4 EC-MAG-65894-CS-INDV Component 3: Project 2018-06- 2018-07- 2018-07- 2018-07- 2018-12- IBRD / 85150 Posterior Individual Open 20,036.72 0.00 Cancelado / Técnico Hidráulico Management 18 09 10 12 31 Guayas EC-MAG-74340-CS-INDV / Fiscalización de obra de Component 1: Investments 2018-11- 2018-11- 2018-11- 2018-12- 2019-06- riego - Implementación del IBRD / 85150 for climate-smart sub- Posterior Individual Open 22,753.95 0.00 Cancelado 06 27 30 06 04 sistema de riego por projects aspersión en el predio "Santa Ana". EC-MAG-74365-CS-INDV / Fiscalización de Obra de Component 1: Investments Riego - Tecnificación de 2018-11- 2018-11- 2018-11- 2018-12- 2019-04- IBRD / 85150 for climate-smart sub- Posterior Individual Open 34,469.01 0.00 Cancelado riego parcelario por micro 06 27 30 06 05 projects aspersión para la Comunidad "Estero Piedras" EC-MAG-74530-CS-INDV Component 3: Project 2018-09- 2018-09- 2018-09- 2018-09- 2018-12- COFN / C1410 Posterior Individual Open 13,680.60 0.00 Cancelado / Técnico Social Imbabura Management 03 24 25 27 31 EC-MAG-74532-CS-INDV Component 3: Project 2018-09- 2018-09- 2018-09- 2018-09- 2018-12- COFN / C1410 Posterior Individual Open 13,680.60 0.00 Cancelado / Técnico Social Cotopaxi Management 03 24 25 27 31 EC-MAG-74533-CS-INDV Component 3: Project 2018-09- 2018-09- 2018-09- 2018-09- 2018-12- COFN / C1410 Posterior Individual Open 14,805.60 0.00 Cancelado / Técnico Social Management 03 24 25 27 31 Chimborazo EC-MAG-65895-CS-INDV Component 3: Project 2018-09- 2018-09- 2018-09- 2018-09- 2018-12- IBRD / 85150 Posterior Individual Open 13,750.05 0.00 Cancelado / Técnico Hidráulico Bolívar Management 03 24 25 27 31 EC-MAGAP-37277-CS- INDV / Fiscalización de Obra de Riego - Component 1: Investments Implementación del 2018-11- 2018-11- 2018-11- 2018-12- 2019-05- IBRD / 85150 for climate-smart sub- Posterior Individual Open 16,852.82 0.00 Cancelado sistema de riego parcelario 06 27 30 06 05 projects por aspersión para la "Asociación de productores agropecuarios La Nueva Esperanza". EC-MAGAP-37278-CS- INDV / Fiscalización de obra de riego - Component 1: Investments 2017-12- 2018-01- 2018-02- 2018-02- 2018-08- Subproyecto: IBRD / 85150 for climate-smart sub- Posterior Individual Open 15,627.85 0.00 Cancelado 22 28 04 20 19 Implementación del projects sistema de riego parcelario por aspersión para la "Asociación Agropecuaria Sierra Morena". EC-MAG-74361-CS-INDV / Fiscalización de Obra de Component 1: Investments Riego - Implementación de 2018-11- 2018-11- 2018-11- 2018-12- 2019-04- COFN / C1410 for climate-smart sub- Posterior Individual Open 47,892.24 0.00 Cancelado riego parcelario tecnificado 06 27 30 06 05 projects con las familias de usuarios del Óvalo Pinguilí EC-MAG-74366-CS-INDV / Fiscalización de Obra de Riego - Implementación de Component 1: Investments 2018-11- 2018-11- 2018-11- 2018-12- 2019-06- riego parcelario tecnificado IBRD / 85150 for climate-smart sub- Posterior Individual Open 25,734.88 0.00 Cancelado 06 27 30 06 04 por aspersión y goteo para projects el sistema de riego "Y de El Guineo" EC-MAGAP-37339-CS- INDV / Fiscalización - Component 1: Investments Subproyecto: Tecnificación 2018-11- 2019-04- 2018-11- 2018-11- 2018-12- 2019-04- IBRD / 85150 for climate-smart sub- Posterior Individual Open 15,142.43 0.00 En ejecución de Riego a nivel parcelario 06 23 27 30 06 05 projects por aspersión para la Junta de Riego "Gúlac - Cruz Rumi" Chumblín. EC-MAG-74176-CS-INDV / Fiscalización - Subproyecto: Component 1: Investments 2018-11- 2018-11- 2018-11- 2018-12- 2019-07- Implementación de riego COFN / C1410 for climate-smart sub- Posterior Individual Open 51,416.79 0.00 Cancelado 06 27 30 06 11 parcelario tecnificado por projects aspersión en 152,44 ha para la Junta General de Riego "Canal Central Toacaso" EC-MAGAP-37273-CS- INDV / Fiscalización - Component 1: Investments Subproyecto: 2018-11- 2018-11- 2018-11- 2018-12- 2019-04- COFN / C1410 for climate-smart sub- Posterior Individual Open 12,377.76 0.00 Cancelado Implementación del 06 27 30 06 05 projects sistema de riego por goteo y aspersión en la Asociación "Un Paso Hacia El Progreso" (Huaquer) EC-MAG-77872-CS-INDV Component 3: Project 2018-09- 2018-10- 2018-10- 2018-10- 2018-12- IBRD / 85150 Posterior Individual Open 13,750.05 0.00 Cancelado / Técnico Hidráulico Bolívar Management 17 08 09 11 31 EC-MAG-65891-CS-INDV Component 3: Project Ejecución 2018-06- 2018-07- 2018-07- 2018-07- 2018-12- / Técnico Hidráulico COFN / C1410 Posterior Individual Open 2,811.12 0.00 Management pendiente 18 09 10 12 31 Tungurahua EC-MAG-84898-CS-CDS / Component 2: Capacity Capacitación en el Método building for institutional Selección directa Ejecución 2018-10- 2018-11- 2018-11- 2018-12- IBRD / 85150 Posterior Direct 35,000.00 0.00 Keyline a Técnicos/as y stakeholders and de consultores pendiente 31 06 11 31 Usuarios/as a Nivel beneficiaries’ Nacional organizations EC-MAG-94368-CS-INDV Component 3: Project 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-12- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 35,533.43 8,583.36 Firmado Management 10 22 12 22 13 29 16 29 31 de Comercialización Azuay EC-MAG-94370-CS-INDV Component 3: Project 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-12- 2020-05- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 32,833.43 8,133.36 Finalizado Management 10 06 12 22 13 25 16 29 31 27 de Comercialización Bolívar EC-MAG-94371-CS-INDV Component 3: Project 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-12- 2019-05- IBRD / 85150 Posterior Individual Direct 45,004.91 7,500.82 Finalizado / Especialista en Management 10 20 12 20 13 21 16 21 31 02 Agronegocios EC-MAG-94372-CS-INDV Component 3: Project 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-12- 2019-05- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 32,833.43 8,133.36 Finalizado Management 10 04 12 22 13 25 16 29 31 27 de Comercialización Pichincha EC-MAG-94374-CS-INDV Component 3: Project 2019-01- 2019-02- 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-12- 2019-05- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 39,133.44 9,183.36 Finalizado Management 10 23 12 22 13 25 16 29 31 27 de Comercialización Manabí EC-MAG-94375-CS-INDV Component 3: Project 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-12- 2019-04- IBRD / 85150 Posterior Individual Direct 45,004.92 7,500.82 Finalizado / Especialista Ambiental 1 Management 10 20 12 20 13 20 16 21 31 15 EC-MAG-94377-CS-INDV Component 3: Project 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-12- 2019-02- IBRD / 85150 Posterior Individual Direct 45,004.92 7,500.82 Finalizado / Especialista Ambiental 2 Management 10 20 12 20 13 21 16 21 31 28 EC-MAG-94378-CS-INDV Component 3: Project 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-12- 2019-07- IBRD / 85150 Posterior Individual Direct 45,004.92 6,150.82 Finalizado / Especialista de Management 10 20 12 20 13 21 16 21 31 30 Capacitación EC-MAG-94380-CS-INDV Component 3: Project 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-12- 2019-03- IBRD / 85150 Posterior Individual Direct 45,004.92 7,500.82 Finalizado / Especialista Hidráulico Management 10 20 12 20 13 21 16 21 31 18 Page 9 EC-MAG-94381-CS-INDV Component 3: Project 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-12- 2019-04- COFN / C1410 Posterior Individual Direct 32,833.43 8,133.36 Finalizado / Técnico Hidráulico Management 10 06 12 22 13 25 16 29 31 22 Imbabura EC-MAG-94383-CS-INDV Component 3: Project 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-09- IBRD / 85150 Posterior Individual Direct 35,533.44 8,133.36 Finalizado / Técnico Hidráulico Azuay Management 10 06 12 22 13 25 16 29 31 02 EC-MAG-94385-CS-INDV Component 3: Project 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-12- 2019-09- IBRD / 85150 Posterior Individual Direct 35,533.43 8,583.36 Finalizado / Técnico Hidráulico Loja Management 10 04 12 22 13 25 16 29 31 03 EC-MAG-94386-CS-INDV Component 3: Project 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-12- 2019-03- IBRD / 85150 Posterior Individual Direct 45,004.92 7,500.82 Finalizado / Especialista Social Management 10 20 12 20 13 21 16 21 31 18 EC-MAG-94387-CS-INDV Component 3: Project 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-12- 2019-05- IBRD / 85150 Posterior Individual Direct 39,133.43 9,183.36 Finalizado / Técnico Social Manabí Management 10 06 12 22 13 25 16 29 31 02 EC-MAG-94389-CS-INDV Component 3: Project 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-12- 2019-05- IBRD / 85150 Posterior Individual Direct 35,533.44 8,583.36 Finalizado / Técnico Social Azuay Management 10 06 12 22 13 25 16 29 31 02 EC-MAG-94390-CS-INDV Component 3: Project 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-12- 2019-07- IBRD / 85150 Posterior Individual Direct 35,533.44 8,583.36 Finalizado / Técnico Social Loja Management 10 06 12 22 13 25 16 29 31 10 EC-MAG-94391-CS-INDV Component 3: Project 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-12- 2019-05- COFN / C1410 Posterior Individual Direct 35,533.44 8,583.36 Finalizado / Técnico Social Carchi Management 10 06 12 22 13 25 16 29 31 02 EC-MAG-94393-CS-INDV Component 3: Project 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-12- 2019-04- COFN / C1410 Posterior Individual Direct 32,833.43 8,133.36 Finalizado / Técnico Hidráulico Management 10 04 12 22 13 25 16 29 31 24 Cotopaxi EC-MAG-94395-CS-INDV Component 3: Project 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-12- 2019-04- / Técnico Agropecuario y IBRD / 85150 Posterior Individual Direct 35,533.44 8,583.36 Finalizado Management 10 04 12 22 13 25 16 29 31 22 de Comercialización El Oro EC-MAG-94396-CS-INDV Component 3: Project 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-12- 2019-05- / Técnico Hidráulico COFN / C1410 Posterior Individual Direct 32,833.43 8,133.36 Finalizado Management 10 06 12 22 13 25 16 29 31 02 Tungurahua EC-MAG-94397-CS-INDV Component 3: Project 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-01- 2019-02- 2019-12- 2019-02- IBRD / 85150 Posterior Individual Direct 45,004.91 7,500.82 Finalizado / Especialista Agrícola Management 10 20 12 20 13 21 16 21 31 28 EC-MAG-94398-CS-INDV Component 3: Project 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-01- 2019-03- 2019-12- 2019-06- IBRD / 85150 Posterior Individual Direct 32,833.44 8,133.36 Finalizado / Técnico Social Pichincha Management 10 06 12 22 13 25 16 29 31 10 EC-MAG-94919-CS-INDV / Fiscalización Obra de Component 1: Investments Riego - Implementación de 2019-08- 2019-08- 2019-08- 2019-09- 2019-09- 2019-09- 2019-09- 2019-09- 2020-03- COFN / C1410 for climate-smart sub- Posterior Individual Open 45,950.46 45,950.46 Firmado Riego Parcelario 05 05 29 25 02 26 10 27 08 projects Tecnificado con las familias de usuarios de la Acequia Mundug Yamate EC-MAG-94927-CS-INDV / Fiscalización Obra de Component 1: Investments Riego - Tecnificación de 2019-06- 2019-07- 2019-07- 2019-09- 2019-07- 2019-09- 2019-07- 2019-09- 2020-01- IBRD / 85150 for climate-smart sub- Posterior Individual Open 28,445.78 28,001.97 Firmado Riego Parcelario por 10 31 04 25 09 27 17 27 13 projects Microaspersión para el Sistema de Riego Putucay EC-MAG-94935-CS-INDV / Fiscalización de Obra de Component 1: Investments Ejecución 2019-08- 2019-08- 2019-09- 2019-09- 2020-01- Riego - Implementación de IBRD / 85150 for climate-smart sub- Posterior Individual Open 26,880.00 0.00 pendiente 06 30 02 10 08 Riego Parcelario projects Tecnificado Luis Cordero EC-MAG-94938-CS-INDV / Fiscalización de Obra de Component 1: Investments 2019-10- 2019-11- 2019-11- 2019-11- 2020-03- Riego - Implementación de COFN / C1410 for climate-smart sub- Posterior Individual Open 24,192.00 0.00 Cancelado 10 01 04 12 11 Riego Parcelario projects Tecnificado "Campo Alegre" EC-MAG-94964-CS-INDV Component 3: Project Ejecución 2019-01- 2019-02- 2019-02- 2019-02- 2019-12- / Técnico Hidráulico COFN / C1410 Posterior Individual Open 35,533.43 0.00 Management pendiente 21 10 13 19 31 Chimborazo EC-MAG-94965-CS-INDV Component 3: Project Ejecución 2019-01- 2019-02- 2019-02- 2019-02- 2019-12- COFN / C1410 Posterior Individual Open 35,533.44 0.00 / Técnico Hidráulico Carchi Management pendiente 21 12 15 21 31 EC-MAG-94971-CS-INDV / Fiscalización - Component 1: Investments Subproyecto: Tecnificación 2019-01- 2019-03- 2019-02- 2019-02- 2019-02- 2019-06- IBRD / 85150 for climate-smart sub- Posterior Individual Open 34,469.01 0.00 En ejecución de riego parcelario por 21 26 15 19 25 25 projects micro aspersión para la Comunidad "Estero Piedras" EC-MAG-94972-CS-INDV / Fiscalización - Component 1: Investments Subproyecto - 2019-01- 2019-04- 2019-02- 2019-02- 2019-02- 2019-07- COFN / C1410 for climate-smart sub- Posterior Individual Open 25,738.66 0.00 En ejecución Implementación de riego 21 23 14 18 25 25 projects parcelario tecnificado tecnificado en el predio Sucuso EC-MAG-94979-CS-INDV / Fiscalización - Component 1: Investments Subproyecto: 2019-01- 2019-03- 2019-02- 2019-02- 2019-02- 2019-06- COFN / C1410 for climate-smart sub- Posterior Individual Open 12,377.76 0.00 Cancelado Implementación del 21 26 14 18 25 25 projects sistema de riego por goteo y aspersión en la Asociación "Un Paso Hacia El Progreso" (Huaquer) EC-MAG-94981-CS-INDV / Fiscalización - Component 1: Investments Subproyecto: 2019-01- 2019-03- 2019-02- 2019-02- 2019-02- 2019-08- COFN / C1410 for climate-smart sub- Posterior Individual Open 47,892.21 0.00 En ejecución Implementación de riego 21 26 14 18 25 24 projects parcelario tecnificado con las familias de usuarios del Óvalo Pinguilí EC-MAG-94983-CS-INDV / Fiscalización - Component 1: Investments Subproyecto: 2019-01- 2019-03- 2019-02- 2019-02- 2019-02- 2019-07- IBRD / 85150 for climate-smart sub- Posterior Individual Open 24,191.62 0.00 En ejecución Implementación del 21 26 14 18 25 25 projects sistema de riego parcelario por aspersión para la "Comuna Jurídica La Libertad" EC-MAG-94985-CS-INDV / Fiscalización - Component 1: Investments Subproyecto: 2019-01- 2019-03- 2019-02- 2019-05- 2019-02- 2019-05- 2019-02- 2019-05- 2019-06- COFN / C1410 for climate-smart sub- Posterior Individual Open 21,073.07 21,073.07 Firmado Implementación de riego 21 26 14 07 18 08 25 13 25 projects por aspersión en la Asociación Agropecuaria Manuel Freire Barba "La Magdalena" EC-MAG-94986-CS-INDV / Fiscalización - Subproyecto: Component 1: Investments 2019-01- 2019-03- 2019-02- 2019-02- 2019-02- 2019-08- Implementación de riego IBRD / 85150 for climate-smart sub- Posterior Individual Open 25,734.87 0.00 En ejecución 21 26 14 18 25 24 parcelario tecnificado por projects aspersión y goteo para el sistema de riego "Y del Guineo" EC-MAG-94987-CS-INDV / Fiscalización - Subproyecto: Component 1: Investments 2019-01- 2019-03- 2019-02- 2019-02- 2019-02- 2019-07- Implementación del IBRD / 85150 for climate-smart sub- Posterior Individual Open 16,852.82 0.00 En ejecución 21 26 14 18 25 25 sistema de riego parcelario projects por aspersión para la "Asociación de Productores Agropecuarios La Nueva Esperanza" EC-MAG-94988-CS-INDV / Fiscalización - Component 1: Investments 2019-01- 2019-03- 2019-02- 2019-05- 2019-02- 2019-05- 2019-02- 2019-05- 2019-08- Subproyecto: IBRD / 85150 for climate-smart sub- Posterior Individual Open 22,753.96 22,753.96 Firmado 21 26 14 09 18 10 25 21 24 Implementación del projects sistema de riego por aspersión en el predio "Santa Ana" EC-MAG-94989-CS-INDV / Fiscalización - Component 1: Investments Subproyecto: 2019-01- 2019-03- 2019-02- 2019-05- 2019-02- 2019-05- 2019-02- 2019-05- 2019-07- IBRD / 85150 for climate-smart sub- Posterior Individual Open 15,627.85 15,627.85 Firmado Implementación del 21 26 14 06 18 07 25 13 25 projects Sistema de riego parcelario por aspersión para la Asociación Agropecuaria "Sierra Morena" EC-MAG-94991-CS-INDV / Fiscalización - Subproyecto: Component 1: Investments 2019-01- 2019-03- 2019-02- 2019-02- 2019-02- 2019-09- Implementación de riego COFN / C1410 for climate-smart sub- Posterior Individual Open 51,416.83 0.00 En ejecución 21 26 14 18 25 30 parcelario tecnificado por projects aspersión en 152.44 ha para la Junta General de Riego "Canal Central Toacaso" EC-MAG-94992-CS-INDV / Fiscalización - Component 1: Investments Subproyecto: 2019-01- 2019-03- 2019-02- 2019-02- 2019-02- 2019-06- IBRD / 85150 for climate-smart sub- Posterior Individual Open 15,182.95 0.00 En ejecución Implementación de riego 21 26 14 18 25 25 projects tecnificado a nivel parcelario en el sistema de riego El Verde Pacayunga EC-MAG-105021-CS- Component 3: Project 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-06- 2019-06- INDV / Especialista en IBRD / 85150 Posterior Individual Direct 11,251.23 9,226.22 Finalizado Management 08 01 12 14 13 18 15 18 13 26 Agronegocios Planta Central EC-MAG-105020-CS- Component 3: Project 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-06- 2019-06- INDV / Especialista Agrícola IBRD / 85150 Posterior Individual Direct 11,251.23 9,226.22 Finalizado Management 08 11 12 14 13 18 15 18 13 27 Planta Central EC-MAG-105024-CS- Component 3: Project 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-06- 2019-06- INDV / Especialista IBRD / 85150 Posterior Individual Direct 11,251.23 9,226.22 Finalizado Management 08 01 12 14 13 15 15 18 13 26 Ambiental 2 Planta Central EC-MAG-105026-CS- Component 3: Project 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-06- INDV / Especialista IBRD / 85150 Posterior Individual Direct 11,251.23 9,226.22 Firmado Management 08 01 12 14 13 14 15 18 13 Ambiental 1 Planta Central EC-MAG-105029-CS- Component 3: Project 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-06- INDV / Especialista IBRD / 85150 Posterior Individual Direct 11,251.23 0.00 En ejecución Management 08 01 12 14 13 15 13 Hidráulico Planta Central EC-MAG-105032-CS- Component 3: Project 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-06- INDV / Especialista Social IBRD / 85150 Posterior Individual Direct 11,251.23 9,226.22 Firmado Management 08 01 12 14 13 15 15 18 13 Planta Central EC-MAG-108572-CS- Component 3: Project 2019-04- 2019-04- 2019-04- 2019-04- 2019-04- 2020-05- 2019-04- 2019-05- 2019-05- 2019-06- INDV / Técnico IBRD / 85150 Posterior Individual Direct 2,961.12 2,661.12 Finalizado Management 18 24 23 30 24 08 26 16 26 18 Agropecuario y de Comercialización Azuay EC-MAG-108573-CS- Component 3: Project 2019-04- 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-07- INDV / Técnico IBRD / 85150 Posterior Individual Direct 2,961.12 2,961.12 Finalizado Management 18 10 23 30 24 08 26 16 26 24 Agropecuario y de Comercialización Bolívar EC-MAG-108574-CS- Component 3: Project 2019-04- 2019-04- 2019-04- 2019-04- 2019-04- 2020-05- 2019-04- 2019-05- 2019-05- 2019-06- INDV / Técnico IBRD / 85150 Posterior Individual Direct 3,261.12 2,661.12 Finalizado Management 18 24 23 30 24 08 26 16 26 19 Agropecuario y de Comercialización Manabí EC-MAG-108577-CS- Component 3: Project 2019-04- 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-06- IBRD / 85150 Posterior Individual Direct 2,961.12 2,661.12 Finalizado INDV / Técnico Hidráulico Management 18 24 23 30 24 08 26 16 26 24 Azuay EC-MAG-108576-CS- Component 3: Project 2019-04- 2019-04- 2019-04- 2019-10- 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-06- INDV / Técnico IBRD / 85150 Posterior Individual Direct 2,736.12 2,661.12 Finalizado Management 18 24 23 29 24 08 26 16 26 19 Agropecuario y de Comercialización Pichincha EC-MAG-108578-CS- Component 3: Project 2019-04- 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- 2019-04- 2019-05- COFN / C1410 Posterior Individual Direct 2,736.12 0.00 En ejecución INDV / Técnico Hidráulico Management 18 24 23 30 24 15 26 26 Cotopaxi EC-MAG-108579-CS- Component 3: Project 2019-04- 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-08- COFN / C1410 Posterior Individual Direct 2,961.12 2,661.12 Finalizado INDV / Técnico Hidráulico Management 18 24 20 30 21 08 23 16 23 22 Imbabura EC-MAG-108580-CS- Component 3: Project 2019-04- 2019-04- 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- IBRD / 85150 Posterior Individual Direct 2,961.12 0.00 En ejecución INDV / Técnico Hidráulico Management 18 24 23 30 24 26 26 Loja EC-MAG-108581-CS- Component 3: Project 2019-04- 2019-04- 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- INDV / Técnico Hidráulico COFN / C1410 Posterior Individual Direct 2,736.12 0.00 En ejecución Management 18 24 20 30 21 23 23 Tungurahua EC-MAG-108584-CS- Component 3: Project 2019-04- 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-07- COFN / C1410 Posterior Individual Direct 2,961.12 2,961.12 Finalizado INDV / Técnico Social Management 18 24 20 30 21 08 23 16 23 24 Carchi Page 10 EC-MAG-108587-CS- Component 3: Project 2019-04- 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-09- IBRD / 85150 Posterior Individual Direct 2,961.12 2,661.12 Finalizado INDV / Técnico Social Management 18 23 23 30 24 08 26 23 26 04 Azuay EC-MAG-108589-CS- Component 3: Project 2019-04- 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-08- IBRD / 85150 Posterior Individual Direct 3,261.12 2,661.12 Finalizado INDV / Técnico Social Management 18 23 23 23 24 08 26 16 26 06 Manabí EC-MAG-108590-CS- Component 3: Project 2019-04- 2019-04- 2019-04- 2019-04- 2019-04- 2020-05- 2019-04- 2019-05- 2019-05- 2019-09- IBRD / 85150 Posterior Individual Direct 2,961.12 2,661.12 Finalizado INDV / Técnico Social Loja Management 18 24 20 30 21 08 23 16 23 13 EC-MAG-108591-CS- Component 3: Project 2019-04- 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-07- IBRD / 85150 Posterior Individual Direct 2,736.12 2,661.12 Finalizado INDV / Técnico Social Management 18 24 20 30 21 08 23 16 23 24 Pichincha EC-MAG-74528-CS-INDV Component 3: Project 2019-04- 2019-05- 2019-04- 2019-06- 2019-04- 2019-06- 2019-04- 2019-07- 2019-05- COFN / C1410 Posterior Individual Open 2,736.12 2,661.12 Firmado / Técnico Social 1 Management 18 02 24 26 25 26 29 01 29 Tungurahua EC-MAG-118180-CS- Component 3: Project 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-10- 2019-07- INDV / Especialista en IBRD / 85150 Posterior Individual Direct 15,001.64 12,301.63 Finalizado Management 07 12 11 13 12 14 17 17 15 22 Agronegocios Planta Central EC-MAG-118182-CS- Component 3: Project 2019-06- 2019-06- 2019-06- 2019-06- 2019-10- INDV / Especialista IBRD / 85150 Posterior Individual Direct 15,001.64 0.00 Cancelado Management 07 11 12 17 15 Ambiental Planta Central 1 EC-MAG-118186-CS- Component 3: Project 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-10- 2019-10- INDV / Especialista IBRD / 85150 Posterior Individual Direct 15,001.64 12,301.63 Finalizado Management 07 13 11 13 12 13 17 17 15 22 Ambiental Planta Central 2 EC-MAG-105030-CS- Component 3: Project 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-06- INDV / Especialista de IBRD / 85150 Posterior Individual Direct 11,251.23 0.00 Cancelado Management 08 01 12 14 13 15 13 Capacitación Planta Central EC-MAG-118188-CS- Component 3: Project 2019-06- 2019-07- 2019-07- 2019-07- 2019-07- 2019-11- INDV / Especialista de IBRD / 85150 Posterior Individual Open 15,001.64 0.00 En ejecución Management 10 11 01 04 08 05 Capacitación Planta Central EC-MAG-118196-CS- Component 3: Project Ejecución 2019-06- 2019-06- 2019-06- 2019-07- 2019-10- INDV / Especialista IBRD / 85150 Posterior Individual Direct 15,001.64 0.00 Management pendiente 07 11 12 01 29 Hidráulico Planta Central EC-MAG-118197-CS- Component 3: Project 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-10- INDV / Especialista Social IBRD / 85150 Posterior Individual Direct 15,001.64 12,301.63 Firmado Management 07 13 11 13 12 14 17 17 15 Planta Central EC-MAG-118198-CS- Component 3: Project 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-10- INDV / Técnico IBRD / 85150 Posterior Individual Direct 11,844.48 10,644.48 Firmado Management 07 18 11 21 12 27 17 01 15 Agropecuario y de Comercialización Azuay EC-MAG-118199-CS- Component 3: Project 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-10- 2019-08- INDV / Técnico IBRD / 85150 Posterior Individual Direct 13,044.48 10,644.48 Finalizado Management 07 18 11 20 12 27 17 01 15 05 Agropecuario y de Comercialización Bolívar EC-MAG-118200-CS- Component 3: Project 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-10- 2019-11- INDV / Técnico IBRD / 85150 Posterior Individual Direct 11,844.48 10,644.48 Finalizado Management 07 18 11 21 12 27 17 01 15 04 Agropecuario y de Comercialización Pichincha EC-MAG-118201-CS- Component 3: Project 2019-06- 2019-07- 2019-06- 2019-07- 2019-06- 2019-07- 2019-06- 2019-08- 2019-10- INDV / Técnico IBRD / 85150 Posterior Individual Direct 13,044.48 10,644.48 Firmado Management 07 04 11 04 12 25 17 01 15 Agropecuario y de Comercialización Manabí EC-MAG-118202-CS- Component 3: Project 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-10- IBRD / 85150 Posterior Individual Direct 11,844.48 10,644.48 Firmado INDV / Técnico Hidráulico Management 07 18 11 21 12 27 17 01 15 Azuay EC-MAG-118204-CS- Component 3: Project 2019-06- 2019-06- 2019-06- 2019-07- 2019-06- 2019-07- 2019-06- 2019-07- 2019-10- COFN / C1410 Posterior Individual Direct 11,844.48 10,644.48 Firmado INDV / Técnico Hidráulico Management 07 25 11 01 12 02 17 11 15 Cotopaxi EC-MAG-118205-CS- Component 3: Project 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-06- 2019-08- 2019-10- COFN / C1410 Posterior Individual Direct 11,844.48 10,644.48 Firmado INDV / Técnico Hidráulico Management 07 25 11 25 12 02 17 01 15 Imbabura EC-MAG-118206-CS- Component 3: Project 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-10- IBRD / 85150 Posterior Individual Direct 11,844.48 10,644.48 Firmado INDV / Técnico Social Management 07 18 11 20 12 27 17 01 15 Azuay EC-MAG-118208-CS- Component 3: Project Ejecución 2019-06- 2019-06- 2019-06- 2019-06- 2019-10- COFN / C1410 Posterior Individual Direct 11,844.48 0.00 INDV / Técnico Social Management pendiente 07 11 12 17 15 Carchi EC-MAG-118210-CS- Component 3: Project 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-06- 2019-07- 2019-10- 2019-12- INDV / Técnico Hidráulico COFN / C1410 Posterior Individual Direct 11,844.48 10,644.48 Finalizado Management 07 27 11 28 12 02 17 11 15 13 Tungurahua EC-MAG-118211-CS- Component 3: Project 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-10- IBRD / 85150 Posterior Individual Direct 11,844.48 10,644.48 Firmado INDV / Técnico Social Loja Management 07 18 11 21 12 27 17 01 15 EC-MAG-118212-CS- Component 3: Project 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-10- IBRD / 85150 Posterior Individual Direct 13,044.48 10,644.48 Firmado INDV / Técnico Social Management 07 21 11 21 12 27 17 01 15 Manabí EC-MAG-118213-CS- Component 3: Project 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-10- IBRD / 85150 Posterior Individual Direct 11,844.48 10,644.48 Firmado INDV / Técnico Social Management 07 18 11 20 12 27 17 01 15 Pichincha EC-MAG-94790-CS-INDV Component 3: Project 2019-04- 2019-05- 2019-04- 2019-04- 2019-04- 2019-05- IBRD / 85150 Posterior Individual Open 2,736.12 0.00 Cancelado / Técnico Hidráulico Management 18 09 24 25 29 29 Pichincha EC-MAG-118215-CS- Component 3: Project 2019-06- 2019-07- 2019-07- 2019-07- 2019-12- IBRD / 85150 Previa Individual Open 14,805.60 0.00 En ejecución INDV / Técnico Hidráulico Management 10 01 04 08 05 Pichincha EC-MAG-74526-CS-INDV Component 3: Project 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- IBRD / 85150 Posterior Individual Open 3,261.12 0.00 Cancelado / Técnico Hidráulico Management 18 24 25 29 29 Manabí EC-MAG-118216-CS- Component 3: Project 2019-06- 2019-08- 2019-07- 2019-07- 2019-07- 2019-12- IBRD / 85150 Posterior Individual Open 16,305.60 0.00 En ejecución INDV / Técnico Hidráulico Management 10 07 01 04 08 05 Manabí EC-MAG-118217-CS- Component 3: Project 2019-06- 2019-08- 2019-07- 2019-07- 2019-07- 2019-11- IBRD / 85150 Posterior Individual Open 11,844.48 0.00 En ejecución INDV / Técnico Hidráulico Management 10 07 01 04 08 05 Loja EC-MAG-108575-CS- Component 3: Project 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- INDV / Técnico IBRD / 85150 Posterior Individual Direct 2,961.12 0.00 Cancelado Management 18 23 24 26 26 Agropecuario y de Comercialización El Oro EC-MAG-118346-CS- Component 3: Project 2019-06- 2019-09- 2019-07- 2019-11- 2019-07- 2019-11- 2019-07- 2019-12- 2019-11- INDV / Técnico IBRD / 85150 Posterior Individual Open 11,844.48 10,664.48 Firmado Management 10 07 01 08 04 08 08 02 05 Agropecuario y de Comercialización El Oro EC-MAG-83537-CS-INDV Component 3: Project 2019-01- 2019-02- 2019-02- 2019-02- 2019-12- / Técnico Hidráulico 2 IBRD / 85150 Posterior Individual Open 33,733.44 0.00 Cancelado Management 21 11 14 18 31 Pichincha EC-MAG-118348-CS- Component 3: Project 2019-06- 2019-08- 2019-07- 2019-07- 2019-07- 2019-11- INDV / Técnico Hidráulico 2 IBRD / 85150 Posterior Individual Open 11,844.48 0.00 En ejecución Management 10 07 01 04 08 05 Pichincha EC-MAG-83543-CS-INDV Component 3: Project 2019-01- 2019-02- 2019-02- 2019-02- 2019-12- IBRD / 85150 Posterior Individual Open 36,433.44 0.00 Cancelado / Técnico Ambiental Management 21 11 14 18 31 Pichincha EC-MAG-118350-CS- Component 3: Project 2019-06- 2019-07- 2019-07- 2019-09- 2019-07- 2019-09- 2019-07- 2019-09- 2019-11- IBRD / 85150 Posterior Individual Open 11,844.48 10,664.48 Firmado INDV / Técnico Ambiental Management 10 12 01 18 04 18 08 30 05 Pichincha EC-MAG-83544-CS-INDV Component 3: Project 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- / Técnico Hidráulico 1 IBRD / 85150 Posterior Individual Open 2,961.12 0.00 Cancelado Management 18 24 25 29 29 Guayas, Los Rios y Santa Elena EC-MAG-118355-CS- Component 3: Project 2019-06- 2019-07- 2019-07- 2019-07- 2019-07- 2019-12- INDV / Técnico Hidráulico 1 IBRD / 85150 Posterior Individual Open 14,805.60 0.00 En ejecución Management 10 04 01 04 08 05 Guayas, Santa Elena, Los Ríos EC-MAG-83545-CS-INDV Component 3: Project 2019-01- 2019-02- 2019-02- 2019-02- 2019-12- / Técnico Hidráulico 2 IBRD / 85150 Posterior Individual Open 38,353.44 0.00 Cancelado Management 21 11 14 18 31 Guayas, Los Ríos y Santa Elena. EC-MAG-118356-CS- Component 3: Project 2019-06- 2019-08- 2019-07- 2019-08- 2019-07- 2019-08- 2019-07- 2019-08- 2019-11- INDV / Técnico Hidráulico 2 IBRD / 85150 Posterior Individual Open 13,044.48 10,644.48 Firmado Management 10 07 01 19 04 21 08 28 05 Guayas, Santa Elena, Los Ríos EC-MAG-83546-CS-INDV Component 3: Project 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- / Técnico Social Guayas, IBRD / 85150 Posterior Individual Open 2,961.12 0.00 Cancelado Management 18 24 25 29 29 Santa Elena, Los Ríos. EC-MAG-118359-CS- Component 3: Project 2019-06- 2019-07- 2019-07- 2019-09- 2019-07- 2019-09- 2019-07- 2019-09- 2019-12- INDV / Técnico Social IBRD / 85150 Posterior Individual Open 14,805.60 10,644.48 Firmado Management 10 12 01 17 04 18 08 19 05 Guayas, Santa Elena, Los Ríos EC-MAG-83547-CS-INDV Component 3: Project 2019-01- 2019-02- 2019-02- 2019-02- 2019-12- COFN / C1410 Posterior Individual Open 33,733.44 0.00 Cancelado / Técnico Social 2 Management 21 11 14 18 31 Tungurahua EC-MAG-118360-CS- Component 3: Project 2019-06- 2019-08- 2019-07- 2019-08- 2019-07- 2019-09- 2019-07- 2019-09- 2019-10- COFN / C1410 Posterior Individual Open 8,883.36 7,983.36 Firmado INDV / Técnico Social 2 Management 10 07 01 30 04 02 08 03 06 Tungurahua EC-MAG-86042-CS-INDV Component 3: Project 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- / Técnico Hidráulico 2 COFN / C1410 Posterior Individual Open 2,736.12 0.00 Cancelado Management 18 24 25 29 29 Tungurahua EC-MAG-118361-CS- Component 3: Project 2019-06- 2019-10- 2019-07- 2019-07- 2019-07- 2019-12- INDV / Técnico Hidráulico 2 COFN / C1410 Posterior Individual Open 14,520.48 0.00 En ejecución Management 10 02 01 04 08 05 Tungurahua EC-MAG-118364-CS- INDV / Técnico Component 3: Project 2019-06- 2019-08- 2019-07- 2019-09- 2019-07- 2019-09- 2019-07- 2019-09- 2019-10- 2019-11- COFN / C1410 Posterior Individual Open 8,883.36 7,983.36 Finalizado Agropecuario y de Management 10 07 01 09 04 10 08 20 06 06 Comercialización Esmeraldas, Carchi e Imbabura EC-MAG-118365-CS- INDV / Técnico Component 3: Project 2019-06- 2019-08- 2019-07- 2019-09- 2019-07- 2019-09- 2019-07- 2019-09- 2019-10- COFN / C1410 Posterior Individual Open 8,883.36 7,983.36 Firmado Agropecuario y de Management 10 07 01 06 04 09 08 12 06 Comercialización Chimborazo, Cotopaxi y Tungurahua EC-MAG-118366-CS- Component 3: Project 2019-06- 2019-08- 2019-07- 2019-07- 2019-07- 2019-11- INDV / Técnico Ambiental IBRD / 85150 Posterior Individual Open 13,044.48 0.00 En ejecución Management 10 07 01 04 08 05 Guayas, Los Ríos, Santa Elena, Bolívar EC-MAG-94140-CS-INDV Component 3: Project 2019-06- 2019-08- 2019-07- 2019-10- 2019-07- 2019-10- 2019-08- 2019-10- 2019-09- IBRD / 85150 Posterior Individual Open 4,451.88 4,451.88 Firmado / Especialista Informático 1 Management 24 08 19 22 22 23 01 28 30 EC-MAG-94144-CS-INDV Component 3: Project 2019-06- 2019-08- 2019-07- 2019-10- 2019-07- 2019-10- 2019-08- 2019-11- 2019-09- IBRD / 85150 Posterior Individual Open 4,451.88 4,451.88 Firmado / Especialista Informático 2 Management 24 08 19 22 22 23 01 06 30 EC-MAG-118370-CS- Component 3: Project 2019-06- 2019-07- 2019-07- 2019-07- 2019-12- COFN / C1410 Posterior Individual Open 14,520.48 0.00 Cancelado INDV / Técnico Social 1 Management 10 01 04 08 05 Tungurahua EC-MAG-118178-CS- Component 3: Project 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-10- INDV / Especialista Agrícola IBRD / 85150 Posterior Individual Direct 15,001.64 12,601.63 Firmado Management 07 13 11 10 12 14 17 17 15 Planta Central EC-MAG-123266-CS- Component 3: Project 2019-07- 2019-08- 2019-09- 2019-09- 2019-11- 2020-03- INDV / Especialista IBRD / 85150 Posterior Individual Open 15,001.64 0.00 En ejecución Management 22 23 09 30 04 03 Ambiental Planta Central 1 EC-MAG-125445-CS- Component 3: Project 2019-07- 2019-08- 2019-08- 2019-08- 2019-08- 2019-10- 2020-03- COFN / C1410 Posterior Individual Direct 14,520.48 0.00 En ejecución INDV / Técnico Social 1 Management 31 20 10 23 31 05 03 Tungurahua EC-MAG-94146-CS-INDV Component 3: Project 2019-08- 2019-05- 2019-08- 2019-10- 2019-08- 2019-10- 2019-09- 2019-10- 2019-11- IBRD / 85150 Posterior Individual Open 3,275.16 3,275.16 Firmado / Analista de Encuestas 1 Management 02 21 24 01 27 01 02 15 01 EC-MAG-94148-CS-INDV Component 3: Project 2019-08- 2019-05- 2019-08- 2019-09- 2019-08- 2019-10- 2019-09- 2019-10- 2019-11- 2019-12- IBRD / 85150 Posterior Individual Open 3,275.16 3,275.16 Finalizado / Analista de Encuestas 2 Management 02 21 24 30 27 01 02 14 01 18 EC-MAG-94151-CS-INDV Component 3: Project 2019-08- 2019-08- 2019-08- 2019-09- 2019-08- 2019-09- 2019-09- 2019-10- 2019-11- IBRD / 85150 Posterior Individual Open 5,042.16 5,042.16 Firmado / Supervisor de Encuestas 2 Management 02 14 24 23 27 23 02 16 01 EC-MAG-94150-CS-INDV Component 3: Project 2019-08- 2019-08- 2019-08- 2019-09- 2019-08- 2019-09- 2019-09- 2019-10- 2019-11- 2019-12- IBRD / 85150 Posterior Individual Open 5,042.16 5,042.16 Finalizado / Supervisor de Encuestas 1 Management 02 23 24 23 27 23 02 17 01 16 Page 11 EC-MAG-135398-CS- Component 1: Investments INDV / FISCALIZACIÓN DE 2019-09- 2019-10- 2019-10- 2019-10- 2019-10- 2020-02- IBRD / 85150 for climate-smart sub- Posterior Individual Open 17,513.65 0.00 En ejecución OBRA DE RIEGO DEL SUB 24 04 18 19 21 18 projects PROYECTO 17 DE JUNIO EC-MAG-136270-CS- INDV / Fiscalización - Obra Component 1: Investments 2019-11- 2019-11- 2019-12- 2019-12- 2019-12- 2020-06- : Implementación de Riego COFN / C1410 for climate-smart sub- Posterior Individual Open 24,192.00 0.00 En ejecución 05 18 10 13 20 17 Parcelario Tecnificado " projects Campo Alegre" EC-MAG-136556-CS- Component 1: Investments 2019-11- 2019-10- 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-12- 2020-04- INDV / Fiscalización de IBRD / 85150 for climate-smart sub- Posterior Individual Open 20,384.00 20,384.00 Firmado 01 16 25 27 29 29 09 12 07 Subproyecto El Paraiso projects EC-MAG-136562-CS- Component 1: Investments 2019-11- 2019-11- 2019-12- 2019-12- 2019-12- 2020-04- INDV / Fiscalización de COFN / C1410 for climate-smart sub- Posterior Individual Open 45,158.40 0.00 En ejecución 05 26 02 05 12 10 Subproyecto Guayama San projects Pedro EC-MAG-136563-CS- Component 1: Investments 2019-11- 2019-10- 2019-11- 2019-12- 2019-12- 2020-04- INDV / Fiscalización de IBRD / 85150 for climate-smart sub- Posterior Individual Open 21,840.00 0.00 En ejecución 05 24 29 03 13 11 Subproyecto Limoncillo projects EC-MAG-136564-CS- Component 1: Investments 2019-11- 2019-10- 2019-11- 2019-12- 2019-12- 2020-04- INDV / Fiscalización de IBRD / 85150 for climate-smart sub- Posterior Individual Open 21,840.00 0.00 En ejecución 01 24 26 02 10 08 Subproyecto projects Puruguaypamba EC-MAG-136598-CS- Component 3: Project 2019-10- 2019-10- 2019-10- 2020-01- 2019-10- 2020-01- 2019-11- 2020-01- 2020-11- IBRD / 85150 Posterior Individual Open 35,533.44 26,611.20 Firmado INDV / Técnico Social Management 04 31 21 20 22 30 20 27 14 Manabí EC-MAG-136605-CS- Component 3: Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2020-11- COFN / C1410 Posterior Individual Open 35,533.44 0.00 En ejecución INDV / Técnico Social Management 04 31 21 22 20 14 Pichincha EC-MAG-136266-CS- Component 3: Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2020-10- INDV / Especialista Social IBRD / 85150 Posterior Individual Direct 45,004.90 36,904.90 Firmado Management 07 15 23 16 24 17 29 18 23 Planta Central EC-MAG-136261-CS- Component 3: Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2020-10- INDV / Especialista en IBRD / 85150 Posterior Individual Direct 45,004.90 36,904.90 Firmado Management 07 15 23 16 24 17 29 18 23 Agronegocios Planta Central EC-MAG-136268-CS- Component 3: Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2020-10- INDV / Especialista Agrícola IBRD / 85150 Posterior Individual Direct 45,004.90 36,904.90 Firmado Management 07 15 23 16 24 17 29 18 23 Planta Central EC-MAG-136264-CS- Component 3: Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2020-10- INDV / Especialista IBRD / 85150 Posterior Individual Direct 45,004.90 36,904.90 Firmado Management 07 15 09 16 10 17 15 18 09 Hidráulico Planta Central EC-MAG-136582-CS- Component 3: Project Ejecución 2019-10- 2019-10- 2019-10- 2019-11- 2020-11- INDV / Técnico Hidráulico COFN / C1410 Posterior Individual Direct 35,533.44 0.00 Management pendiente 04 20 21 19 13 Tungurahua EC-MAG-136587-CS- Component 3: Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2020-11- INDV / Técnico IBRD / 85150 Posterior Individual Direct 35,533.44 0.00 En ejecución Management 04 28 20 29 21 19 13 Agropecuario y de Comercialización Azuay EC-MAG-136604-CS- Component 3: Project Ejecución 2019-10- 2019-10- 2019-10- 2019-11- 2020-11- COFN / C1410 Posterior Individual Direct 35,533.44 0.00 INDV / Técnico Social Management pendiente 04 20 21 19 13 Carchi EC-MAG-136579-CS- Component 3: Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- 2019-11- 2020-11- IBRD / 85150 Posterior Individual Direct 35,533.44 31,933.44 Firmado INDV / Técnico Hidráulico Management 04 28 20 29 21 11 19 15 13 Azuay EC-MAG-136263-CS- Component 3: Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2020-10- INDV / Especialista IBRD / 85150 Posterior Individual Direct 45,004.90 36,904.90 Firmado Management 07 15 23 16 24 17 29 18 23 Ambiental Planta Central 2 EC-MAG-136577-CS- Component 3: Project 2019-10- 2019-11- 2019-10- 2019-11- 2019-10- 2019-12- 2019-11- 2019-12- 2020-11- COFN / C1410 Posterior Individual Direct 35,533.44 31,933.44 Firmado INDV / Técnico Hidráulico Management 04 13 20 19 22 02 21 04 15 Imbabura EC-MAG-136595-CS- Component 3: Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2019-11- 2019-11- 2020-11- INDV / Técnico IBRD / 85150 Posterior Individual Direct 35,533.44 31,933.44 Firmado Management 04 28 20 29 21 19 19 21 13 Agropecuario y de Comercialización Pichincha EC-MAG-136596-CS- Component 3: Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2020-11- INDV / Técnico IBRD / 85150 Posterior Individual Direct 35,533.44 0.00 En ejecución Management 04 28 20 29 21 19 13 Agropecuario y de Comercialización Manabí EC-MAG-136586-CS- Component 3: Project Ejecución 2019-10- 2019-10- 2019-10- 2019-11- 2020-11- COFN / C1410 Posterior Individual Direct 35,533.44 0.00 INDV / Técnico Hidráulico Management pendiente 04 20 21 19 13 Cotopaxi EC-MAG-136600-CS- Component 3: Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2020-10- IBRD / 85150 Posterior Individual Direct 35,533.44 0.00 En ejecución INDV / Técnico Social Management 04 28 20 29 21 23 17 Azuay EC-MAG-136602-CS- Component 3: Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2020-11- IBRD / 85150 Posterior Individual Direct 35,533.44 0.00 En ejecución INDV / Técnico Social Loja Management 04 28 20 29 21 19 13 EC-MAG-136593-CS- Component 3: Project Ejecución 2019-10- 2019-10- 2019-10- 2019-11- 2020-11- INDV / Técnico IBRD / 85150 Posterior Individual Direct 35,533.44 0.00 Management pendiente 04 20 21 19 13 Agropecuario y de Comercialización Bolívar EC-MAG-142620-CS- Component 1: Investments 2019-10- 2019-11- 2019-11- 2019-11- 2019-12- 2020-05- INDV / Fiscalización de IBRD / 85150 for climate-smart sub- Posterior Individual Open 39,602.76 0.00 En ejecución 28 26 19 24 04 02 subproyecto: La Playa projects EC-MAG-142623-CS- Component 3: Project 2019-10- 2019-11- 2019-11- 2019-12- 2020-11- INDV / Técnico Hidráulico 2 IBRD / 85150 Posterior Individual Open 35,533.44 0.00 Cancelado Management 28 21 26 06 30 Pichincha EC-MAG-142626-CS- Component 3: Project Ejecución 2019-10- 2019-11- 2019-11- 2019-12- 2020-11- IBRD / 85150 Posterior Individual Direct 35,533.44 0.00 INDV / Técnico Hidráulico Management pendiente 28 17 22 02 26 Loja EC-MAG-142627-CS- Component 3: Project 2019-10- 2019-11- 2019-11- 2019-12- 2019-11- 2019-12- 2019-12- 2019-12- 2020-11- IBRD / 85150 Posterior Individual Direct 35,533.44 31,933.44 Firmado INDV / Técnico Hidráulico Management 28 29 03 05 08 12 04 13 28 Manabí EC-MAG-142629-CS- INDV / Técnico Component 3: Project Ejecución 2019-10- 2019-11- 2019-11- 2019-12- 2020-11- COFN / C1410 Posterior Individual Direct 35,533.44 0.00 Agropecuario y de Management pendiente 28 17 22 02 26 Comercialización Chimborazo, Cotopaxi, Tungurahua EC-MAG-142630-CS- INDV / Técnico Component 3: Project Ejecución 2019-10- 2019-11- 2019-11- 2019-12- 2020-11- COFN / C1410 Posterior Individual Direct 35,533.44 0.00 Agropecuario y de Management pendiente 28 17 22 02 26 Comercialización Esmeraldas, Carchi, Imbabura EC-MAG-142632-CS- Component 3: Project Ejecución 2019-10- 2019-11- 2019-11- 2019-12- 2020-11- COFN / C1410 Posterior Individual Direct 35,533.44 0.00 INDV / Técnico Social 2 Management pendiente 28 17 22 02 26 Tungurahua EC-MAG-142633-CS- Component 3: Project 2019-10- 2019-11- 2019-11- 2019-12- 2020-11- COFN / C1410 Posterior Individual Direct 35,533.44 0.00 Cancelado INDV / Técnico Social 1 Management 28 17 22 02 26 Tungurahua EC-MAG-142635-CS- Component 3: Project 2019-10- 2019-12- 2019-11- 2019-11- 2019-12- 2020-12- IBRD / 85150 Posterior Individual Open 35,533.44 0.00 En ejecución INDV / Técnico Ambiental Management 28 09 22 27 07 01 Guayas EC-MAG-142636-CS- Component 3: Project 2019-10- 2019-12- 2019-11- 2019-11- 2019-12- 2020-12- IBRD / 85150 Posterior Individual Open 35,533.44 0.00 En ejecución INDV / Técnico Ambiental Management 28 09 22 27 07 01 Azuay EC-MAG-142637-CS- Component 3: Project 2019-10- 2019-12- 2019-11- 2019-11- 2019-12- 2020-11- IBRD / 85150 Posterior Individual Direct 35,533.44 0.00 En ejecución INDV / Técnico Hidráulico Management 28 09 17 22 02 26 El Oro EC-MAG-142638-CS- Component 3: Project 2019-10- 2019-12- 2019-11- 2020-02- 2019-11- 2020-02- 2019-12- 2020-02- 2020-12- IBRD / 85150 Posterior Individual Open 35,533.44 26,611.20 Firmado INDV / Técnico Social El Management 28 02 22 03 27 04 07 27 01 Oro EC-MAG-142639-CS- Component 3: Project 2019-10- 2019-12- 2019-11- 2019-11- 2019-12- 2020-12- INDV / Técnico Supervisor IBRD / 85150 Posterior Individual Open 35,533.44 0.00 En ejecución Management 28 09 22 27 07 01 de Procesos Planta Central EC-MAG-142640-CS- Component 3: Project Ejecución 2019-10- 2019-11- 2019-11- 2019-12- 2020-12- INDV / Especialista IBRD / 85150 Posterior Individual Open 45,004.90 0.00 Management pendiente 28 22 27 07 01 Supervisor de intervenciones territoriales EC-MAG-142641-CS- Component 3: Project 2019-10- 2019-11- 2019-11- 2019-12- 2020-12- INDV / Especialista IBRD / 85150 Posterior Individual Open 45,004.90 0.00 Cancelado Management 28 22 27 07 01 Ambiental Planta Central 1 EC-MAG-142642-CS- Component 3: Project 2019-10- 2019-11- 2019-11- 2019-12- 2020-12- INDV / Especialista en IBRD / 85150 Posterior Individual Open 45,004.90 0.00 Cancelado Management 28 22 27 07 01 Capacitación Planta Central EC-MAG-142643-CS- INDV / Asistencia Técnica y Component 3: Project 2019-10- 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-05- Capacitación para la puesta IBRD / 85150 Posterior Individual Direct 50,000.00 0.00 En ejecución Management 28 19 17 26 22 02 30 en marcha del sistema de riego: La Paquita EC-MAG-142644-CS- INDV / Técnico Component 3: Project 2019-10- 2019-11- 2019-11- 2020-02- 2019-11- 2020-02- 2019-12- 2020-02- 2020-12- IBRD / 85150 Posterior Individual Open 35,533.44 26,611.20 Firmado Agropecuario y Management 28 26 22 04 27 06 07 27 01 Comercialización Guayas, Los Ríos, Bolívar, Santa Elena EC-MAG-142645-CS- Component 3: Project Ejecución 2019-10- 2019-11- 2019-11- 2019-12- 2020-11- INDV / Especialista IBRD / 85150 Posterior Individual Open 45,004.90 0.00 Management pendiente 28 21 26 06 30 Ambiental 2 Planta Central EC-MAG-142624-CS- Component 3: Project Ejecución 2019-11- 2019-12- 2019-12- 2019-12- 2020-12- INDV / Técnico Hidráulico 2 IBRD / 85150 Posterior Individual Direct 39,133.44 0.00 Management pendiente 25 12 13 19 13 Guayas, Los Ríos, Bolívar y Santa Elena EC-MAG-142625-CS- Component 3: Project 2019-11- 2019-11- 2019-12- 2019-12- 2019-12- 2019-12- 2019-12- 2019-12- 2020-12- INDV / Técnico Hidráulico 1 IBRD / 85150 Posterior Individual Direct 39,133.44 31,933.44 Firmado Management 25 29 15 05 16 12 22 13 16 Guayas, Los Ríos, Bolíivar y Santa Elena EC-MAG-146591-CS- Component 3: Project 2019-11- 2019-12- 2019-12- 2020-01- 2019-12- 2020-02- 2020-01- 2020-02- 2020-12- COFN / C1410 Posterior Individual Open 35,533.44 26,611.20 Firmado INDV / Técnico Social 1 Management 25 02 13 31 14 03 05 26 30 Tungurahua EC-MAG-146596-CS- Component 3: Project Ejecución 2019-11- 2019-12- 2019-12- 2019-12- 2020-12- INDV / Especialista IBRD / 85150 Posterior Individual Direct 45,004.90 0.00 Management pendiente 25 11 12 18 12 Capacitación Planta Central EC-MAG-146608-CS- INDV / Fiscalización de la Implementación del Sistema de riego parcelario Component 3: Project Ejecución 2019-11- 2019-12- 2019-12- 2019-12- 2020-06- por aspersión para la "Junta IBRD / 85150 Posterior Individual Open 50,400.00 0.00 Management pendiente 25 14 15 31 28 de Riego y Abrevadero de Paquiestancia" de la parroquia Ayora, cantón Cayambe, provincia de Pichincha. EC-MAG-142619-CS- Component 1: Investments 2019-12- 2019-12- 2019-12- 2020-01- 2019-12- 2020-01- 2020-01- 2020-05- INDV / Fiscalización de IBRD / 85150 for climate-smart sub- Posterior Individual Open 33,000.00 29,123.86 En ejecución 05 04 25 10 30 13 09 08 Subproyecto: San Francisco projects de Orongo EC-MAG-142628-CS- Component 3: Project 2020-02- 2019-12- 2020-03- 2019-12- 2020-03- 2020-02- 2020-03- 2020-02- 2020-12- IBRD / 85150 Posterior Individual Direct 26,650.08 26,611.20 Firmado INDV / Técnico Hidráulico Management 28 02 05 05 06 03 12 26 07 Pichincha EC-MAG-159014-CS- Component 3: Project 2020-02- 2020-03- 2020-03- 2020-03- 2020-12- INDV / Especialista en IBRD / 85150 Posterior Individual Direct 33,753.67 0.00 Cancelado Management 28 05 06 12 07 Capacitación Planta Central EC-MAG-146598-CS- Component 3: Project 2020-02- 2020-02- 2020-03- 2020-02- 2020-03- 2020-03- 2020-12- INDV / Especialista IBRD / 85150 Posterior Individual Direct 33,753.67 0.00 En ejecución Management 28 28 05 28 06 12 07 Ambiental 1 Planta Central EC-MAG-142631-CS- Component 3: Project 2020-02- 2020-02- 2020-03- 2020-02- 2020-03- 2020-03- 2020-03- 2020-03- 2020-12- IBRD / 85150 Posterior Individual Direct 26,650.08 21,288.96 Firmado INDV / Técnico Ambiental Management 28 27 05 27 06 12 12 16 07 Pichincha EC-MAG-159045-CS- Component 3: Project 2020-02- 2020-07- 2020-03- 2020-03- 2020-04- 2020-12- INDV / Especialista IBRD / 85150 Posterior Individual Open 30,003.26 0.00 En ejecución Management 28 17 27 30 07 03 Hidráulico Planta Central Page 12 EC-MAG-159048-CS- Component 3: Project 2020-02- 2020-03- 2020-03- 2020-04- 2020-12- INDV / Especialista Social IBRD / 85150 Posterior Individual Open 30,003.26 0.00 Cancelado Management 28 27 30 07 03 Planta Central EC-MAG-142634-CS- Component 3: Project 2020-02- 2020-02- 2020-03- 2020-02- 2020-03- 2020-03- 2020-04- 2020-03- 2020-12- INDV / Técnico Social IBRD / 85150 Posterior Individual Direct 26,650.08 21,288.96 Firmado Management 28 27 23 27 27 04 03 09 29 Guayas, Los Ríos, Bolívar y Santa Elena EC-MAG-159050-CS- Component 3: Project 2020-02- 2020-03- 2020-03- 2020-04- 2020-10- COFN / C1410 Posterior Individual Open 17,766.72 0.00 Cancelado INDV / Técnico Social Management 28 27 30 07 04 Esmeraldas EC-MAG-146587-CS- INDV / Técnico Component 3: Project 2020-02- 2020-02- 2020-03- 2020-03- 2020-04- 2020-12- IBRD / 85150 Posterior Individual Open 26,650.08 0.00 En ejecución Agropecuario y de Management 28 26 27 30 07 03 Comercialización Guayas, Los Ríos, Bolívar, Santa Elena 2 EC-MAG-161963-CS- Component 3: Project 2020-02- 2020-03- 2020-03- 2020-03- 2020-03- 2020-04- 2021-01- INDV / Esepcialista Social IBRD / 85150 Posterior Individual Direct 34,000.00 0.00 En ejecución Management 27 05 18 05 23 22 17 Planta Central EC-MAG-161965-CS- Component 3: Project 2020-02- 2020-03- 2020-03- 2020-04- 2020-05- 2021-01- INDV / Especialista en IBRD / 85150 Posterior Individual Open 32,000.00 0.00 En ejecución Management 28 09 24 08 20 15 Capacitación Planta Central EC-MAG-161968-CS- Component 3: Project 2020-03- 2020-07- 2020-03- 2020-04- 2020-05- 2021-01- IBRD / 85150 Posterior Individual Open 6,320.00 0.00 En ejecución INDV / Auxiliar 1 Management 02 13 27 11 24 19 EC-MAG-161974-CS- Component 3: Project 2020-03- 2020-07- 2020-03- 2020-04- 2020-05- 2020-12- IBRD / 85150 Posterior Individual Open 6,320.00 0.00 En ejecución INDV / Auxiliar 2 Management 02 13 27 01 04 30 EC-MAG-161976-CS- Component 3: Project 2020-03- 2020-07- 2020-03- 2020-09- 2020-04- 2020-09- 2020-05- 2020-09- 2020-12- IBRD / 85150 Posterior Individual Open 6,320.00 2,123.52 Firmado INDV / Auxiliar 3 Management 02 13 27 11 01 14 04 24 30 EC-MAG-161978-CS- Component 3: Project 2020-03- 2020-07- 2020-03- 2020-09- 2020-04- 2020-09- 2020-05- 2020-12- IBRD / 85150 Posterior Individual Open 6,320.00 2,123.52 En ejecución INDV / Auxiliar 4 Management 02 13 27 11 01 14 04 30 EC-MAG-161979-CS- Component 3: Project Ejecución 2020-03- 2020-03- 2020-04- 2020-05- 2020-12- IBRD / 85150 Posterior Individual Open 10,650.00 0.00 INDV / Conductor 1 Management pendiente 02 27 01 04 30 EC-MAG-161980-CS- Component 3: Project Ejecución 2020-03- 2020-03- 2020-04- 2020-05- 2020-12- IBRD / 85150 Posterior Individual Open 10,650.00 0.00 INDV / Conductor 2 Management pendiente 02 27 01 04 30 EC-MAG-165293-CS- INDV / Consultoría para la Evaluación de Infraestructura Primaria, Component 3: Project Ejecución 2020-03- 2020-04- 2020-04- 2020-05- 2020-08- IBRD / 85150 Posterior Individual Open 100,800.00 0.00 Levantamiento Topográfico Management pendiente 31 22 27 27 10 y Catastral para el subproyecto “Gracias a Dios” ubicado en el cantón Quinsaloma, provincia de Los Ríos EC-MAG-165298-CS- INDV / Consultoría para la Evaluación de Infraestructura Primaria, Component 3: Project Ejecución 2020-03- 2020-04- 2020-04- 2020-05- 2020-08- IBRD / 85150 Posterior Individual Open 50,400.00 0.00 Levantamiento Topográfico Management pendiente 31 22 27 27 10 y Catastral para el subproyecto “Guanazán” ubicado en el cantón Zaruma, provincia de El Oro EC-MAG-165301-CS- INDV / Plan de Component 3: Project 2020-03- 2020-05- 2020-04- 2020-04- 2020-05- 2020-09- Capacitación y Asistencia IBRD / 85150 Posterior Individual Open 13,440.00 0.00 En ejecución Management 31 19 22 27 27 24 Técnica para la puesta en marcha del Subproyecto Santa Ana EC-MAG-169708-CS- Component 3: Project 2020-04- 2020-05- 2020-05- 2020-05- 2020-05- 2020-06- 2020-10- INDV / Técnico IBRD / 85150 Posterior Individual Direct 14,805.60 0.00 En ejecución Management 27 15 07 19 12 03 31 Agropecuario y de Comercialización El Oro EC-MAG-159049-CS- Component 3: Project 2020-02- 2020-02- 2020-03- 2020-03- 2020-04- 2020-10- COFN / C1410 Posterior Individual Open 17,766.72 0.00 Cancelado INDV / Técnico Hidráulico Management 28 26 27 30 07 04 Esmeraldas EC-MAG-159052-CS- Component 3: Project 2020-02- 2020-02- 2020-03- 2020-03- 2020-04- 2020-12- IBRD / 85150 Posterior Individual Open 26,650.08 0.00 Cancelado INDV / Técnico Eléctrico Management 28 26 27 30 07 03 EC-MAG-165303-CS- Component 3: Project 2020-03- 2020-04- 2020-04- 2020-05- 2020-11- INDV / Técnico Hidráulico 2 IBRD / 85150 Posterior Individual Open 17,766.72 0.00 Cancelado Management 31 22 27 27 23 Tungurahua EC-MAG-173946-CS- Component 3: Project Selección directa 2020-06- 2020-06- 2020-06- 2020-07- 2021-01- INDV / Técnico Hidráulico 2 IBRD / 85150 Posterior Direct 17,766.72 0.00 Cancelado Management de consultores 05 04 15 21 17 Tungurahua EC-MAG-178642-CS- Component 3: Project 2020-07- 2020-07- 2020-07- 2020-08- 2020-09- 2021-01- IBRD / 85150 Posterior Individual Open 12,500.00 0.00 En ejecución INDV / TÉCNICO Management 06 10 30 01 03 01 ELÉCTRICO EC-MAG-165300-CS- Component 3: Project Ejecución 2020-07- 2020-08- 2020-08- 2020-09- 2021-01- COFN / C1410 Posterior Individual Open 12,500.00 0.00 INDV / TÉCNICO SOCIAL Management pendiente 13 03 05 04 02 ESMERALDAS EC-MAG-178651-CS- Component 3: Project Ejecución 2020-07- 2020-08- 2020-08- 2020-09- 2021-01- INDV / TÉCNICO IBRD / 85150 Posterior Individual Open 12,500.00 0.00 Management pendiente 13 03 05 04 02 AGROPECUARIO Y DE COMERCIALIZACIÓN MANABÍ EC-MAG-178653-CS- INDV / TÉCNICO SOCIAL 2 Component 3: Project 2020-07- 2020-09- 2020-08- 2020-08- 2020-09- 2021-01- IBRD / 85150 Posterior Individual Open 12,500.00 0.00 En ejecución GUAYAS, LOS RÍOS, Management 13 16 03 05 04 02 BOLÍVAR, SANTA ELENA EC-MAG-178650-CS- Component 3: Project 2020-08- 2020-09- 2020-09- 2020-09- 2020-10- 2021-02- INDV / TÉCNICO IBRD / 85150 Posterior Individual Open 12,000.00 0.00 En ejecución Management 15 16 05 10 11 08 HIDRÁULICO ESMERALDAS EC-MAG-186696-CS- Component 3: Project Ejecución 2020-08- 2020-09- 2020-09- 2020-10- 2021-02- INDV / TÉCNICO SOCIAL IBRD / 85150 Posterior Individual Open 12,000.00 0.00 Management pendiente 14 04 06 09 06 GUAYAS, LOS RÍOS Y SANTA ELENA 2 EC-MAG-189244-CS- Component 1: Investments 2020-09- 2020-10- 2020-10- 2020-10- 2020-11- 2021-03- INDV / FISCALIZACIÓN DE IBRD / 85150 for climate-smart sub- Posterior Individual Open 15,810.28 0.00 En ejecución 07 21 12 17 18 18 OBRA DEL SUBPROYECTO projects LA BÉLGICA EC-MAG-189247-CS- Component 3: Project 2020-09- 2020-09- 2020-10- 2020-10- 2020-11- 2021-04- INDV / PUESTA EN MARCHA IBRD / 85150 Posterior Individual Open 33,600.00 0.00 En ejecución Management 14 17 19 24 26 25 DEL PROYECTO PÍLLARO SUR EC-MAG-189250-CS- Component 3: Project 2020-09- 2020-09- 2020-10- 2020-10- 2020-11- 2021-03- INDV / PUESTA EN MARCHA IBRD / 85150 Posterior Individual Open 11,200.00 0.00 En ejecución Management 14 18 19 24 26 26 DEL PROYECTO 17 DE JUNIO EC-MAG-189216-CS- Component 1: Investments INDV / FISCALIZACIÓN DE 2020-10- 2020-10- 2020-11- 2020-11- 2020-11- 2021-05- IBRD / 85150 for climate-smart sub- Posterior Individual Open 55,027.56 0.00 En ejecución LA OBRA DEL 20 21 13 13 30 29 projects SUBPROYECTO CEREZAL BELLAVISTA EC-MAG-189217-CS- Component 1: Investments INDV / FISCALIZACIÓN DE 2020-10- 2020-10- 2020-11- 2020-11- 2020-11- 2021-05- IBRD / 85150 for climate-smart sub- Posterior Individual Open 54,624.36 0.00 En ejecución LA OBRA DEL 20 21 13 13 30 29 projects SUBPROYECTO CHAMBITOLA EC-MAG-189238-CS- Component 1: Investments INDV / FISCALIZACIÓN DE 2020-10- 2020-10- 2020-11- 2020-11- 2020-11- 2021-06- IBRD / 85150 for climate-smart sub- Posterior Individual Open 61,141.73 0.00 En ejecución LA OBRA DEL 20 21 13 13 30 28 projects SUBPROYECTO CHIRIYACU LUCERO EC-MAG-189239-CS- Component 1: Investments INDV / FISCALIZACIÓN DE 2020-10- 2020-10- 2020-11- 2020-11- 2020-11- 2021-04- IBRD / 85150 for climate-smart sub- Posterior Individual Open 35,643.44 0.00 En ejecución LA OBRA DEL 20 21 13 13 30 29 projects SUBPROYECTO NUEVA SEMILLA Y 17 DE ABRIL EC-MAG-189242-CS- Component 1: Investments INDV / FISCALIZACIÓN DE 2020-10- 2020-10- 2020-11- 2020-11- 2020-11- 2021-03- COFN / C1410 for climate-smart sub- Posterior Individual Open 25,125.21 0.00 En ejecución LA OBRA DEL 20 21 13 13 30 30 projects SUBPROYECTO SISTEMA DE RIEGO BELISARIO QUEVEDO EC-MAG-189241-CS- Component 1: Investments INDV / FISCALIZACIÓN DE 2020-10- 2020-10- 2020-11- 2020-11- 2020-11- 2021-05- COFN / C1410 for climate-smart sub- Posterior Individual Open 40,045.96 0.00 En ejecución LA OBRA DEL 20 21 13 13 30 29 projects SUBPROYECTO SISTEMA DE RIEGO ARRIAGA EC-MAG-189243-CS- Component 1: Investments INDV / FISCALIZACIÓN DE 2020-10- 2020-10- 2020-11- 2020-11- 2020-11- 2021-03- COFN / C1410 for climate-smart sub- Posterior Individual Open 22,222.09 0.00 En ejecución LA OBRA DEL 20 21 21 21 30 30 projects SUBPROYECTO SISTEMA DE RIEGO LAS ARDILLAS EC-MAG-205900-CS- INDV / ANÁLISIS Y Component 3: Project Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-03- CARACTERIZACIÓN IBRD / 85150 Posterior Individual Open 5,600.00 0.00 Management pendiente 01 26 29 31 17 MULTIVARIADOS DE LOS SUBPROYECTOS PIT EC-MAG-205901-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-06- / ESPECIALISTA AGRÍCOLA IBRD / 85150 Posterior Direct 22,502.46 0.00 Management de consultores pendiente 01 07 31 29 PLANTA CENTRAL EC-MAG-205902-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-06- / ESPECIALISTA AMBIENTAL IBRD / 85150 Posterior Direct 22,502.46 0.00 Management de consultores pendiente 01 07 31 29 1  PLANTA CENTRAL EC-MAG-205903-CS- Component 3: Project Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-06- INDV / ESPECIALISTA IBRD / 85150 Posterior Individual Open 22,502.46 0.00 Management pendiente 01 19 20 01 30 AMBIENTAL 2 PLANTA CENTRAL EC-MAG-205904-CS-CDS / ESPECIALISTA EN Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-06- IBRD / 85150 Posterior Direct 22,502.46 0.00 AGRONEGOCIOS PLANTA Management de consultores pendiente 01 07 31 29 CENTRAL EC-MAG-205905-CS-CDS / ESPECIALISTA EN Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-06- IBRD / 85150 Posterior Direct 22,502.46 0.00 CAPACITACION  PLANTA Management de consultores pendiente 01 07 31 29 CENTRAL EC-MAG-205906-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-06- / ESPECIALISTA IBRD / 85150 Posterior Direct 22,502.46 0.00 Management de consultores pendiente 01 07 31 29 HIDRÁULICO PLANTA CENTRAL EC-MAG-205907-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-06- / ESPECIALISTA SOCIAL IBRD / 85150 Posterior Direct 22,502.46 0.00 Management de consultores pendiente 01 07 31 29 PLANTA CENTRAL EC-MAG-205908-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-06- / TÉCNICO SUPERVISOR DE IBRD / 85150 Posterior Direct 17,766.72 0.00 Management de consultores pendiente 01 07 31 29 PROCESOS PLANTA CENTRAL EC-MAG-205909-CS- INDV / TÉCNICO Component 3: Project Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-06- AGROPECUARIO Y DE COFN / C1410 Posterior Individual Open 17,766.72 0.00 Management pendiente 01 19 20 01 30 COMERCIALIZACIÓN CHIMBORAZO, COTOPAXI Y TUNGURAHUA EC-MAG-205910-CS-CDS / TÉCNICO AGROPECUARIO Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-06- Y DE COMERCIALIZACIÓN COFN / C1410 Posterior Direct 17,766.72 0.00 Management de consultores pendiente 01 07 31 29 ESMERALDAS, CARCHI E IMBABURA EC-MAG-205911-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-05- / TÉCNICO AGROPECUARIO IBRD / 85150 Posterior Direct 14,805.60 0.00 Management de consultores pendiente 01 07 31 30 Y DE COMERCIALIZACIÓN AZUAY EC-MAG-205912-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-06- / TÉCNICO AGROPECUARIO IBRD / 85150 Posterior Direct 17,766.72 0.00 Management de consultores pendiente 01 07 31 29 Y DE COMERCIALIZACIÓN EL ORO Page 13 EC-MAG-205913-CS-CDS / TÉCNICO AGROPECUARIO Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-04- Y DE COMERCIALIZACIÓN IBRD / 85150 Posterior Direct 11,844.48 0.00 Management de consultores pendiente 01 07 31 30 GUAYAS, LOS RÍOS, BOLÍVAR, SANTA ELENA 1 EC-MAG-205914-CS- INDV / TÉCNICO Component 3: Project Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-06- AGROPECUARIO Y DE IBRD / 85150 Posterior Individual Open 17,766.72 0.00 Management pendiente 01 19 20 01 30 COMERCIALIZACIÓN GUAYAS, LOS RÍOS. BOLIVAR Y SANTA ELENA 2 EC-MAG-205915-CS- Component 3: Project Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-07- INDV / TÉCNICO IBRD / 85150 Posterior Individual Open 17,766.72 0.00 Management pendiente 01 19 20 10 09 AGROPECUARIO Y DE COMERCIALIZACIÓN MANABÍ EC-MAG-205916-CS-CDS / TÉCNICO AGROPECUARIO Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-05- IBRD / 85150 Posterior Direct 14,805.60 0.00 Y DE COMERCIALIZACIÓN Management de consultores pendiente 01 07 31 30 PICHINCHA EC-MAG-205917-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-06- IBRD / 85150 Posterior Direct 17,766.72 0.00 / TÉCNICO AMBIENTAL Management de consultores pendiente 01 07 31 29 AZUAY EC-MAG-205920-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-06- IBRD / 85150 Posterior Direct 17,766.72 0.00 / TÉCNICO AMBIENTAL Management de consultores pendiente 01 07 31 29 GUAYAS EC-MAG-205921-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-05- / TÉCNICO AMBIENTAL IBRD / 85150 Posterior Direct 14,805.60 0.00 Management de consultores pendiente 01 07 31 30 PICHINCHA EC-MAG-205922-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-06- IBRD / 85150 Posterior Direct 17,766.72 0.00 / TÉCNICO ELÉCTRICO Management de consultores pendiente 01 07 31 29 EC-MAG-205923-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-05- IBRD / 85150 Posterior Direct 14,805.60 0.00 / TÉCNICO HIDRÁULICO Management de consultores pendiente 01 07 31 30 AZUAY EC-MAG-205924-CS- Component 3: Project Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-05- IBRD / 85150 Posterior Individual Open 11,844.48 0.00 INDV / TÉCNICO Management pendiente 01 19 20 01 01 HIDRÁULICO EL ORO EC-MAG-205925-CS- INDV / TÉCNICO Component 3: Project Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-05- IBRD / 85150 Posterior Individual Open 14,805.60 0.00 HIDRÁULICO GUAYAS, LOS Management pendiente 01 19 20 01 31 RÍOS, BOLÍVAR, Y SANTA ELENA 1 EC-MAG-205926-CS- INDV / TÉCNICO Component 3: Project Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-05- IBRD / 85150 Posterior Individual Open 14,805.60 0.00 HIDRÁULICO 2 GUAYAS, Management pendiente 01 19 20 01 31 LOS RIOS, BOLIVAR Y SANTA ELENA EC-MAG-205927-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-06- / TÉCNICO HIDRÁULICO COFN / C1410 Posterior Direct 17,766.72 0.00 Management de consultores pendiente 01 07 31 29 IMBABURA EC-MAG-205928-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-04- IBRD / 85150 Posterior Direct 11,844.48 0.00 / TÉCNICO HIDRÁULICO Management de consultores pendiente 01 07 31 30 LOJA EC-MAG-205929-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-04- / TÉCNICO HIDRÁULICO IBRD / 85150 Posterior Direct 11,844.48 0.00 Management de consultores pendiente 01 07 31 30 MANABÍ EC-MAG-205930-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-04- / TÉCNICO HIDRÁULICO IBRD / 85150 Posterior Direct 11,844.48 0.00 Management de consultores pendiente 01 07 31 30 PICHINCHA EC-MAG-205931-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-05- / TÉCNICO HIDRÁULICO COFN / C1410 Posterior Direct 14,805.60 0.00 Management de consultores pendiente 01 07 31 30 TUNGURAHUA EC-MAG-205933-CS- Component 3: Project Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-06- INDV / TÉCNICO SOCIAL COFN / C1410 Posterior Individual Open 17,766.72 0.00 Management pendiente 01 19 20 01 30 IMBABURA, CARCHI Y ESMERALDAS EC-MAG-205939-CS- Component 3: Project Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-06- INDV / TÉCNICO SOCIAL - COFN / C1410 Posterior Individual Open 17,766.72 0.00 Management pendiente 01 19 20 01 30 KICHWA SIERRA NORTE EC-MAG-205967-CS- Component 3: Project Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-06- INDV / TÉCNICO SOCIAL - COFN / C1410 Posterior Individual Open 17,766.72 0.00 Management pendiente 01 19 20 01 30 KICHWA SIERRA CENTRAL EC-MAG-205972-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-05- IBRD / 85150 Posterior Direct 14,805.60 0.00 / TÉCNICO SOCIAL AZUAY Management de consultores pendiente 01 07 31 30 EC-MAG-205975-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-04- IBRD / 85150 Posterior Direct 11,844.48 0.00 / TÉCNICO SOCIAL EL ORO Management de consultores pendiente 01 07 31 30 EC-MAG-205977-CS- INDV / TÉCNICO SOCIAL Component 3: Project Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-06- IBRD / 85150 Posterior Individual Open 17,766.72 0.00 GUAYAS, LOS RÍOS, Management pendiente 01 19 20 01 30 BOLÍVAR, Y SANTA ELENA 1 EC-MAG-205978-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-05- IBRD / 85150 Posterior Direct 14,805.60 0.00 / TÉCNICO SOCIAL LOJA Management de consultores pendiente 01 07 31 30 EC-MAG-205979-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-04- IBRD / 85150 Posterior Direct 11,844.48 0.00 / TÉCNICO SOCIAL MANABÍ Management de consultores pendiente 01 07 31 30 EC-MAG-205980-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-05- IBRD / 85150 Posterior Direct 14,805.60 0.00 / TÉCNICO SOCIAL Management de consultores pendiente 01 07 31 30 PICHINCHA EC-MAG-205981-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-04- / TÉCNICO SOCIAL COFN / C1410 Posterior Direct 11,844.48 0.00 Management de consultores pendiente 01 07 31 30 TUNGURAHUA 1 EC-MAG-205982-CS-CDS Component 3: Project Selección directa Ejecución 2020-12- 2020-12- 2020-12- 2021-04- / TÉCNICO SOCIAL COFN / C1410 Posterior Direct 11,844.48 0.00 Management de consultores pendiente 01 07 31 30 TUNGURAHUA 2 EC-MAG-205983-CS- Component 3: Project Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-06- INDV / ESPECIALISTA EN IBRD / 85150 Posterior Individual Open 22,502.46 0.00 Management pendiente 01 19 20 01 30 GÉNERO PLANTA CENTRAL EC-MAG-205984-CS- INDV / ACTUALIZACIÓN Component 3: Project Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-03- IBRD / 85150 Posterior Individual Open 6,720.00 0.00 COMPONENTE SOCIAL DEL Management pendiente 01 19 20 01 02 MOP EC-MAG-205988-CS- Component 2: Capacity INDV / Puesta en Marcha building for institutional Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-04- IBRD / 85150 Posterior Individual Open 16,800.00 0.00 del Subproyecto Gulac - stakeholders and pendiente 01 19 24 05 05 Cruz Rumi beneficiaries’ organizations Component 2: Capacity EC-MAG-205989-CS- building for institutional Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-04- INDV / Puesta en Marcha IBRD / 85150 Posterior Individual Open 20,000.00 0.00 stakeholders and pendiente 01 19 20 01 01 del Subproyecto Sucuso beneficiaries’ organizations Component 2: Capacity EC-MAG-205990-CS- building for institutional Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-05- INDV / Puesta en Marcha IBRD / 85150 Posterior Individual Open 22,400.00 0.00 stakeholders and pendiente 01 19 20 01 01 del Subproyecto Putucay beneficiaries’ organizations EC-MAG-205991-CS- Component 2: Capacity INDV / Puesta en Marcha building for institutional Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-05- IBRD / 85150 Posterior Individual Open 33,600.00 0.00 del Subproyecto Las stakeholders and pendiente 01 19 20 01 31 Mercedes beneficiaries’ organizations Component 2: Capacity EC-MAG-205992-CS- building for institutional Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-05- INDV / Puesta en Marcha IBRD / 85150 Posterior Individual Open 33,600.00 0.00 stakeholders and pendiente 01 19 20 01 31 del Subproyecto Pimampiro beneficiaries’ organizations Component 2: Capacity EC-MAG-205993-CS- building for institutional Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-05- INDV / Puesta en Marcha IBRD / 85150 Posterior Individual Open 33,600.00 0.00 stakeholders and pendiente 01 19 20 01 31 del Subproyecto Procafeq beneficiaries’ organizations Component 2: Capacity EC-MAG-205994-CS- building for institutional Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-04- INDV / Puesta en Marcha IBRD / 85150 Posterior Individual Open 16,800.00 0.00 stakeholders and pendiente 01 19 20 01 01 del Subproyecto El Paraíso beneficiaries’ organizations EC-MAG-205996-CS- Component 2: Capacity INDV / Puesta en Marcha building for institutional Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-04- IBRD / 85150 Posterior Individual Open 22,400.00 0.00 del Subproyecto Campo stakeholders and pendiente 01 19 20 01 01 Alegre beneficiaries’ organizations Component 2: Capacity EC-MAG-205997-CS- building for institutional Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-04- INDV / Puesta en Marcha IBRD / 85150 Posterior Individual Open 20,160.00 0.00 stakeholders and pendiente 01 19 20 01 01 del Subproyecto Limoncillo beneficiaries’ organizations EC-MAG-205998-CS- Component 2: Capacity INDV / Puesta en Marcha building for institutional Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-05- IBRD / 85150 Posterior Individual Open 22,400.00 0.00 del Subproyecto stakeholders and pendiente 01 19 20 01 01 Puruhuaypamba beneficiaries’ organizations EC-MAG-205999-CS- INDV / CONSULTORIA PARA LA EJECUCIÓN DE LOS ESTUDIOS GEOTÉCNICOS Component 3: Project Ejecución 2020-12- 2020-12- 2020-12- 2021-01- 2021-02- IBRD / 85150 Posterior Individual Open 14,967.36 0.00 PARA EL RESERVORIO DEL Management pendiente 01 19 20 01 15 SUBPROYECTO “LA PLAYA” DEL CANTON CAÑAR PROVINCIA DEL CAÑAR” Page 14