Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan [Original: April 2016]: Revision of Updated Procurement Plan, December 2019] 2. Date of General Procurement Notice: November 1 2016 3. Period covered by this procurement plan: The procurement period of project covered from year 2016 to 2021 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 4 million All 2. NCB (Goods) Above US$ 4 million All July 9, 2010 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 15 million All 5. (Non-Consultant Services) Above US$ 4 million All 0 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Ningbo Sustainable Urbanization Project 01/20/2016 issued by Ningbo PMO 4. Any Other Special Procurement Arrangements: None 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. Description Estimate Packag Domestic Review Comments No. d es Preferen ce by Bank Cost (yes/no) (Prior / US$ Post) million July 9, 2010 XGP3 Purchase of 2.344 1 No Prior Signed 30 new- energy buses (Goods) XCP3 Huancheng 34.7 1 No Prior Signed Road West construction (from Danshan Road to Binhai Avenue): main road with total length 2952m, L652m/2300 m, W36m/25m, and related municipal pipeline facilities. (Works) XGP1 Traffic 8.65 1 No Prior Signed management : intelligence traffic (Goods) XGP4-1 Purchase of 7.30 1 No Prior Signed 65 new- energy buses (Goods) NCP1 Taoyuan 5.625 1 No Post Signed Road Middle reconstructio n: urban primary road, lenght 1.3km, width 60m/55m, cross section optimization, July 9, 2010 four motor lanes broden to six motor lanes, drainage inlet reconstructio n, lighting facilites, greening and landscape (Works) XCP5 Overall 10.56 1 No Post Signed renewal of Tian'an Road (Xiangshan Harbour Road to Binhai Avenue section), public space improvement along Dannan Road, commercial area renovation (Jianshe Road to Xiangshan Harbour Road). (Works) XCP7 Tashan 1.95 1 No Post Signed Terminal (Works) NCP3 Renmin Road 5.11 1 No Post Signed reconstructio n (from Taoyuan Road Middle to Xinghai Road Middle) July 9, 2010 (Works) NCP5 Ninghai 1.31 1 No Post Signed Central Urban Area bus terminal construction: Qiaotouhu Terminal (Works) FCP1 Xikou old 7.26 1 No Post Signed town public space improvement : Wuling Road reconstructio n and improvement (Works) NCP4 Qianhuang 0.75 1 No Post Canceled Terminal construction (Works) XGP1-1 Traffic signal 0.75 1 No Post Signed controller (Goods) XCP3-1 Huancheng 19.00 1 No Prior Signed Road West construction (from Danshan Road to Binhai Avenue): main road with total length 2952m, L652m/2300 m, July 9, 2010 W36m/25m, and related municipal pipeline facilities. (Works) FCP2 Wulinfang 2.907 1 No Post Area reconstructio n and improvement (Works) XCP2 Jinnan Street 2.946 1 No Post reconstructio n (Works) NCP10 Upper reach 1.75 1 No Post of Huailu River (Works) NCP11 Longyan 4.15 1 No Post Creek (Works) NCP9 Zhu Creek 3.29 1 No Post (300m from Qian'ao village to the downstream of Xinghailu Bridge) (Works) XCP4 Baohai Road 7.1 1 No Post NEW (Works) XCP5-1 Tian’an Road 3.0 1 No Post NEW Urban Regeneration (Works) XCP10 Juying Road 15.25 1 No Prior NEW (Tashan road to Binhai Avenue) July 9, 2010 (Works) XCP11 Juying Road 13.33 1 No Post NEW (Binhai Avenue to Damuwan) (Works) XCP12 Binhai 5.97 1 No Post NEW Avenue (Tian'an Road to Juying Road) (Works) XCP13 Danyang 1.61 1 No Post NEW Park (Works) XCP14 Xinyi Road, 13.6 3 No Post NEW Fengrao Road, Xingyang Road (Works) NCP8 Xunan Creek 2.99 1 No Post NEW (Works) NCP9-1 Zhu Creek 2.32 1 No Post NEW (890m upstream of the Taoyuan North Road) (Works) NCP10- Huailu River 5.43 1 No Post NEW 1 upstream section (Science and Technology Park) (Works) NCP10- Huailu River 7.0 1 No Post NEW 2 upstream section (Qiaotouhu Street) (Works) July 9, 2010 NCP12 Meilin Creek 11.61 1 No Post NEW (Works) NCP13 Pu Lake 2.86 1 No Post NEW (water diversion project) (Works) NCP13- Pu Lake (lake 25.71 1 No Prior NEW 1 restoration) (Works) NCP14 Xujia River 4.44 1 No Post NEW (Works) NCP15 Lingjiao Aoli 3.82 1 No Post NEW River (Works) NCP16 Qiaoxiapan 1.72 1 No Post NEW River (Works) NCP17 Dongshan 3.0 1 No Post NEW flood discharge channel (Works) NCP18 Dianqianwan 1.79 1 No Post NEW g Creek (Works) FCP5 Reconstructi 14.28 1 No Post NEW on of blocks around Chiang's ancestral hall (Works) XGP2 Intelligent 2.86 1 No Post NEW bus system (Goods) July 9, 2010 XGP5 Tian'an Road 0.71 1 No Post NEW guardrail (Goods) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 2,000,000 2. Single Source (Firms) All 3. Individual Above US$ 400,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: None 4. Consultancy Assignments with Selection Methods and Time Schedule July 9, 2010 1 2 3 4 5 6 Ref. No. Description Estimate Packag Revie Comment of d es w s Assignment Cost by Bank US$ million (Prior / Post) NBTA1 Project 1.2 1 Prior QCBS Managemen Signed t, Institutional Strengtheni ng and Training NBTA3-1 Study on 0.25 1 Post CQS Fenghua Signed intelligence transportati on and pilot implementa tion NBTA2 Public 0.8 1 Post QCBS facilities and Canceled service fund support NBTA5-1 Strategic 0.295 1 Post CQS study on Signed Xiangshan public transportati on developmen July 9, 2010 t NBTA6 Flood risk 0.075 1 Post SSS assessment Signed in Ninghai county NBTA4 Study on 0.295 1 Post CQS Blue Asset NEW Managemen t and O&M Investment in Ninghai NBTA7 Study on 0.94 1 Post QCBS Ningbo NEW 2035 in Sustainable Urbanization NBTA8 Study on 0.28 1 Post CQS Ningbo NEW Urban Resilience NBTA9 Study and 0.66 1 Post QCBS Overview of NEW Contract Managemen t introduced with WB Project Managemen t Method July 9, 2010 PROCUREMENT China : Ningbo Sustainable Urbanization Project PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2016-09-27 2021-06-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P149485 GPN Date: 2016-11-01 Project Name: Ningbo Sustainable Urbanization Project Loan / Credit No: IBRD / 86220 N Executing Agency(ies): ingbo sustainable urbanization PMO WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned NCP1 / Taoyuan Road Middle reconstruction: urban primary road, lenght 1.3km, width 60m/55m, cross section Component 2: Urban Single Stage - One 3,614,570.7 2017-11- optimization, four motor IBRD / 86220 Post Request for Bids Open - National 5,625,000.00 Signed 2017-01-16 2017-01-18 2017-01-23 2017-03-06 2017-02-23 2017-04-05 2017-04-07 2017-05-10 2017-04-11 Transport Envelope 3 06 lanes broden to six motor lanes, drainage inlet reconstruction, lighting facilites, greening and landscape XCP5 / Overall renewal of Tian'an Road (Xiangshan Harbour Road to Binhai Avenue section), public space Component 2: Urban Single Stage - One 10,560,000.0 7,407,935.1 2018-05- IBRD / 86220 Post Request for Bids Open - National Signed 2017-08-07 2017-08-04 2017-08-12 2017-08-13 2017-09-23 2017-09-15 2017-10-23 2017-10-21 2017-11-27 2017-11-08 improvement along Dannan Transport Envelope 0 7 26 Road, commercial area renovation (Jianshe Road to Xiangshan Harbour Road). XCP3 / Huancheng Road West construction (from Danshan Road to Binhai Avenue): main Component 2: Urban Single Stage - One 34,700,000.0 23,466,602. 2018-06- road with total length 2952m, IBRD / 86220 Prior Request for Bids Open - National Signed 2017-08-14 2017-09-14 2017-09-01 2017-09-22 2017-10-13 2017-11-01 2017-11-12 2017-11-30 2017-12-17 2018-03-01 Transport Envelope 0 92 15 L652m/2300m, W36m/25m, and related municipal pipeline facilities. XCP7 / Tashan terminal Component 2: Urban Single Stage - One 1,669,152.1 2019-03- IBRD / 86220 Post Request for Bids Open - National 1,950,000.00 Signed 2017-11-01 2018-02-09 2017-11-06 2017-12-18 2018-03-29 2018-01-17 2018-04-03 2018-02-21 2018-07-11 construction Transport Envelope 1 21 NCP3 / Renmin Road reconstruction (from Taoyuan Component 2: Urban Single Stage - One 4,379,951.5 2019-01- IBRD / 86220 Post Request for Bids Open - National 5,110,000.00 Signed 2017-10-09 2017-10-19 2017-10-14 2017-10-29 2017-11-25 2017-11-24 2017-12-25 2017-12-25 2018-01-29 2017-12-29 Road Middle to Xinghai Road Transport Envelope 0 31 Middle) NCP5 / Ninghai Central Urban Area bus terminal Component 2: Urban Single Stage - One 2019-02- IBRD / 86220 Post Request for Bids Open - National 1,310,000.00 798,107.68 Signed 2017-11-01 2017-12-01 2017-11-06 2017-12-18 2018-01-02 2018-01-17 2018-01-19 2018-02-21 2018-02-09 construction: Qiaotouhu Transport Envelope 28 Terminal FCP1 / Xikou old town public space improvement: Wuling Component 1: Urban Single Stage - One 6,167,937.3 2019-01- IBRD / 86220 Post Request for Bids Open - National 7,260,000.00 Signed 2017-09-30 2017-09-30 2017-10-09 2017-11-20 2017-11-14 2017-12-20 2017-12-09 2018-01-24 2018-01-09 Road reconstruction and Regeneration Envelope 2 31 improvement NCP4 / Qianhuang Terminal Component 2: Urban Single Stage - One 2019-12- IBRD / 86220 Post Request for Bids Open - National 750,000.00 0.00 Canceled 2018-08-06 2018-08-11 2018-09-22 2018-10-22 2018-11-26 construction Transport Envelope 03 XCP3-1 / Huancheng Road West construction (from Danshan Road to Binhai Avenue): main road with total Component 2: Urban Single Stage - One 19,000,000.0 18,835,982. 2020-10- IBRD / 86220 Prior Request for Bids Limited Signed 2019-01-31 2019-02-01 2019-02-11 2019-02-19 2019-03-04 2019-03-11 2019-04-03 2019-03-25 2019-05-08 2019-04-18 length 2952m, Transport Envelope 0 97 29 L652m/2300m, W36m/25m, and related municipal pipeline facilities. FCP2 / Wulinfang Area Component 1: Urban Single Stage - One 1,873,622.7 2020-12- reconstruction and IBRD / 86220 Post Request for Bids Open - National 2,907,000.00 Signed 2019-08-30 2019-08-29 2019-09-08 2019-10-20 2019-10-10 2019-11-19 2019-11-19 2019-12-24 2020-01-13 Regeneration Envelope 9 26 improvement XCP2 / Jinnan Street Component 1: Urban Single Stage - One 2,780,670.9 2020-06- IBRD / 86220 Post Request for Bids Open - National 2,946,000.00 Signed 2019-08-30 2019-09-10 2019-09-04 2019-10-16 2019-10-30 2019-11-15 2019-11-19 2019-12-20 2019-12-26 reconstruction Regeneration Envelope 8 17 NCP10 / Upper reach of Huailu River: Yonglin Line to Shenhai Expressway Section, Component 3: Flood Risk Single Stage - One 1,024,935.0 2020-07- 380 meters long, with box IBRD / 86220 Post Request for Bids Open - National 1,750,000.00 Signed 2019-09-30 2019-09-29 2019-10-08 2019-11-19 2019-11-01 2019-12-19 2019-11-29 2020-01-23 2019-12-19 Management Envelope 1 21 culvert 183 meters, open channel 199.6 meters, culvert laying, etc. NCP11 / Longyan Creek: The total length 2180m, of which the main river channel 1259m, the new diversion section 145m, and the Component 3: Flood Risk Single Stage - One 2,006,432.6 2021-01- IBRD / 86220 Post Request for Bids Open - National 4,150,000.00 Signed 2019-09-30 2019-09-29 2019-10-08 2019-11-19 2019-11-01 2019-12-19 2019-12-05 2020-01-23 2020-01-02 tributary 776m; construction Management Envelope 0 22 of the embankment 3450m, of which main channel 1984m, new diversion section 290m, the tributary 1176m. NCP9 / Zhuxi construction: dyke building, barrage construction, manhole works, Component 3: Flood Risk Single Stage - One 2,250,417.0 2021-04- IBRD / 86220 Post Request for Bids Open - National 3,100,000.00 Signed 2020-01-02 2019-12-30 2020-01-07 2020-02-18 2020-04-15 2020-03-19 2020-05-07 2020-04-23 2020-06-03 culvert and diversion channel Management Envelope 9 23 works, stairs design, landscape and greening works XCP4 / Baohai Road (Xinyi Road to Laixun Road section): Component 2: Urban Single Stage - One 4,784,075.6 2021-10- secondary trunk road, L702m, IBRD / 86220 Post Request for Bids Open - National 7,100,000.00 Signed 2020-06-25 2020-11-23 2020-06-30 2020-08-11 2020-12-24 2020-09-10 2020-12-29 2020-10-15 2021-05-12 Transport Envelope 2 15 W24m, and related municipal pipeline facilities Page 1 Pending XCP5-1 / Tian’an Road Urban Component 1: Urban Single Stage - One 2021-09- IBRD / 86220 Post Request for Bids Open - National 3,000,000.00 0.00 Implementat 2020-06-10 2020-06-15 2020-07-27 2020-08-26 2020-09-30 Regeneration Regeneration Envelope 30 ion Under XCP10 / Juying Road (Tashan Component 1: Urban Single Stage - One 15,250,000.0 2021-11- IBRD / 86220 Prior Request for Bids Open - National 0.00 Implementat 2020-08-10 2021-05-19 2020-08-28 2020-10-09 2020-11-08 2020-12-13 road to Binhai Avenue) Regeneration Envelope 0 13 ion XCP11 / Juying Road (Binhai Component 1: Urban Single Stage - One 13,330,000.0 12,723,653. 2021-09- IBRD / 86220 Post Request for Bids Open - National Signed 2020-06-10 2021-02-04 2020-06-15 2020-07-27 2021-03-11 2020-08-26 2021-03-10 2020-09-30 2021-05-31 Avenue to Damuwan) Regeneration Envelope 0 28 30 XCP12 / Binhai Avenue Component 1: Urban Single Stage - One 5,143,140.6 2021-09- IBRD / 86220 Post Request for Bids Open - National 5,970,000.00 Signed 2020-06-10 2020-11-23 2020-06-15 2020-07-27 2020-12-25 2020-08-26 2020-12-30 2020-09-30 2021-04-30 (Tian'an Road to Juying Road) Regeneration Envelope 7 30 Component 1: Urban Single Stage - One 2021-10- XCP13 / Danyang Park IBRD / 86220 Post Request for Bids Open - National 1,610,000.00 0.00 Canceled 2020-06-25 2020-06-30 2020-08-11 2020-09-10 2020-10-15 Regeneration Envelope 15 Component 3: Flood Risk Single Stage - One 2,133,458.8 2021-09- NCP8 / Xunan Creek IBRD / 86220 Post Request for Bids Open - National 2,990,000.00 Signed 2020-05-15 2020-09-17 2020-05-20 2020-07-01 2020-10-28 2020-07-31 2020-10-30 2020-09-04 2020-11-20 Management Envelope 1 04 NCP9-1 / Zhu Creek (890m Component 3: Flood Risk Single Stage - One 2021-10- upstream of the Taoyuan IBRD / 86220 Post Request for Bids Open - National 2,320,000.00 0.00 Canceled 2020-06-15 2020-06-20 2020-08-01 2020-08-31 2020-10-05 Management Envelope 05 North Road) NCP10-1 / Huailu River Component 3: Flood Risk Single Stage - One 4,191,635.1 2021-11- upstream section (Science and IBRD / 86220 Post Request for Bids Open - National 5,430,000.00 Signed 2020-08-10 2021-02-08 2020-08-15 2020-09-26 2021-03-19 2020-10-26 2021-03-19 2020-11-30 2021-05-14 Management Envelope 1 30 Technology Park) NCP10-2 / Huailu River Component 3: Flood Risk Single Stage - One 2,385,229.3 2021-11- upstream section (Qiaotouhu IBRD / 86220 Post Request for Bids Open - National 7,000,000.00 Signed 2020-07-15 2021-01-22 2020-07-20 2020-08-31 2021-03-04 2020-09-30 2021-03-17 2020-11-04 2021-05-13 Management Envelope 4 04 Street) Component 3: Flood Risk Single Stage - One 11,610,000.0 9,708,732.7 2022-05- NCP12 / Meilin Creek IBRD / 86220 Post Request for Bids Open - National Signed 2020-07-20 2021-01-22 2020-07-25 2020-09-05 2021-03-03 2020-10-05 2021-03-17 2020-11-09 2021-05-06 Management Envelope 0 2 08 Component 3: Flood Risk Single Stage - One 2,785,959.9 2021-12- NCP14 / Xujia River IBRD / 86220 Post Request for Bids Open - National 4,440,000.00 Signed 2020-09-01 2021-02-08 2020-09-06 2020-10-18 2021-03-19 2020-11-17 2021-03-19 2020-12-22 2021-04-29 Management Envelope 2 22 Component 3: Flood Risk Single Stage - One 2021-12- NCP15 / Lingjiao Aoli River IBRD / 86220 Post Request for Bids Open - National 3,820,000.00 978,497.13 Signed 2020-09-01 2020-10-26 2020-09-06 2020-10-18 2021-03-04 2020-11-17 2021-03-17 2020-12-22 2021-05-06 Management Envelope 22 Component 3: Flood Risk Single Stage - One 2021-12- NCP16 / Qiaoxiapan River IBRD / 86220 Post Request for Bids Open - National 1,720,000.00 0.00 Canceled 2020-09-01 2020-09-06 2020-10-18 2020-11-17 2020-12-22 Management Envelope 22 NCP17 / Dongshan flood Component 3: Flood Risk Single Stage - One 2022-01- IBRD / 86220 Post Request for Bids Open - National 3,000,000.00 0.00 Canceled 2020-09-15 2020-09-20 2020-11-01 2020-12-01 2021-01-05 discharge channel Management Envelope 05 Component 3: Flood Risk Single Stage - One 1,529,274.3 2021-11- NCP18 / Dianqianwang Creek IBRD / 86220 Post Request for Bids Open - National 1,790,000.00 Signed 2020-08-10 2020-09-17 2020-08-15 2020-09-26 2020-10-28 2020-10-26 2020-10-30 2020-11-30 2020-11-19 Management Envelope 2 30 FCP5 / Reconstruction of Pending Component 1: Urban Single Stage - One 14,280,000.0 2022-07- blocks around Chiang's IBRD / 86220 Post Request for Bids Open - National 0.00 Implementat 2020-09-30 2020-10-09 2020-11-20 2020-12-20 2021-01-24 Regeneration Envelope 0 23 ancestral hall ion Under XCP14 / Fengrao Road, Component 2: Urban Single Stage - One 2022-01- IBRD / 86220 Post Request for Bids Open - National 7,350,000.00 0.00 Implementat 2020-11-30 2020-11-23 2020-12-05 2021-01-16 2020-12-23 2021-02-15 2021-06-08 2021-03-22 Xingyang Road construction Transport Envelope 16 ion Pending XCP14-1 / XinyI Road Component 2: Urban Single Stage - One 2022-03- IBRD / 86220 Post Request for Bids Open - National 3,980,000.00 0.00 Implementat 2021-01-15 2021-01-20 2021-03-03 2021-04-02 2021-05-07 construction Transport Envelope 03 ion National Procurement Pending NCP13 / Pu Lake (water Component 3: Flood Risk Single Stage - One 10,000,000.0 2022-10- IBRD / 86220 Post Request for Bids Open - National Document - 1 0.00 Implementat 2021-06-30 2021-07-05 2021-08-16 2021-09-15 2021-10-20 diversion project) Management Envelope 0 20 Envelope process ion (Non Bank-SPD) National Procurement Pending NCP13-1 / Pu Lake (lake Component 3: Flood Risk Single Stage - One 13,000,000.0 2023-07- IBRD / 86220 Post Request for Bids Open - National Document - 1 0.00 Implementat 2021-09-15 2021-09-30 2021-11-11 2021-12-11 2022-01-15 restoration) Management Envelope 0 14 Envelope process ion (Non Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual XGP3 / purchase of 30 new- Component 2: Urban Single Stage - One IBRD / 86220 Prior Request for Bids Open - National 2,344,000.00 2,142,527.84 Signed 2016-10-27 2016-11-09 2016-11-01 2016-12-13 2017-03-09 2017-01-12 2017-06-09 2017-02-16 2017-07-07 2017-06-16 energy buses Transport Envelope XGP1 / Traffic management: Component 2: Urban Single Stage - One IBRD / 86220 Prior Request for Bids Open - National 8,650,000.00 6,687,948.56 Signed 2017-11-01 2018-03-16 2017-11-06 2018-07-12 2017-12-18 2018-09-05 2018-01-17 2018-11-15 2018-02-21 2018-12-19 2018-12-21 intelligence traffic Transport Envelope XGP4 / purchase of 65 new- Component 2: Urban Single Stage - One IBRD / 86220 Prior Request for Bids Open - National 7,300,000.00 0.00 Canceled 2018-08-20 2018-09-12 2018-09-17 2018-10-29 2018-10-29 2018-11-28 2019-01-09 2019-01-02 2019-12-31 engery buses Transport Envelope XGP1-1 / Traffic signal controller, platform software upgrade, mobile handheld terminal, vehicle GPS positioning equipment, Component 2: Urban IBRD / 86220 Post Direct Selection Direct 750,000.00 592,738.64 Signed 2018-11-12 2018-11-02 2018-12-05 2019-01-12 2019-01-31 2019-04-12 integrated video command Transport system, disaster recovery backup, signal timing optimization, traffic detection system XGP4-1 / Purchase of 65 new- Component 2: Urban Single Stage - One IBRD / 86220 Prior Request for Bids Open - National 7,300,000.00 7,000,790.00 Signed 2019-02-12 2019-02-19 2019-03-12 2019-04-23 2019-03-28 2019-05-23 2019-04-11 2019-06-27 2019-05-09 2020-01-13 engery buses Transport Envelope Under Component 2: Urban Single Stage - One XGP2 / Intelligent bus system IBRD / 86220 Post Request for Bids Open - National 2,860,000.00 0.00 Implementati 2020-06-15 2021-02-08 2020-06-20 2020-08-01 2021-05-14 2020-08-31 2021-05-14 2020-10-05 2022-04-03 Transport Envelope on Page 2 XGP5 / Tian'an Road Component 2: Urban Single Stage - One IBRD / 86220 Post Request for Bids Open - National 710,000.00 0.00 Canceled 2020-06-01 2020-06-06 2020-07-18 2020-08-17 2020-09-21 2021-02-18 guardrail Transport Envelope NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NBTA1 / Project Component 4: Technical Quality And Cost- Management, Institutional IBRD / 86220 Assistance and Capacity Prior Open - International 1,200,000.00 1,073,666.18 Signed 2016-10-10 2016-10-19 2016-10-31 2016-11-03 2016-12-14 2017-04-26 2017-01-11 2017-06-12 2017-02-10 2017-07-24 2017-03-17 2017-09-04 2017-04-21 2017-09-05 2020-12-31 Based Selection Strengthening and Training Building NBTA3 / Study on Fenghua Component 4: Technical Quality And Cost- intelligence transportation IBRD / 86220 Assistance and Capacity Post Open - International 300,000.00 0.00 Canceled 2018-05-07 2018-05-28 2018-07-11 2018-08-08 2018-09-07 2018-10-12 2018-11-16 2019-11-16 Based Selection and pilot implementation Building NBTA3-1 / Study on Fenghua Component 4: Technical Consultant intelligence transportation IBRD / 86220 Assistance and Capacity Post Qualification Open - National 250,000.00 251,921.08 Signed 2018-06-04 2018-07-11 2018-06-25 2018-08-08 2019-01-02 2018-09-07 2019-01-25 2018-10-12 2019-03-06 2019-04-10 and pilot implementation Building Selection Component 4: Technical NBTA2 / Public facilities and Quality And Cost- IBRD / 86220 Assistance and Capacity Post Open - International 800,000.00 0.00 Canceled 2018-10-08 2018-10-29 2018-12-12 2019-01-09 2019-02-08 2019-03-15 2019-04-19 2022-12-29 service fund support Based Selection Building NBTA5 / Strategic study on Component 4: Technical Consultant Xiangshan public IBRD / 86220 Assistance and Capacity Post Qualification Open - National 200,000.00 0.00 Canceled 2018-09-10 2018-10-15 2018-11-28 2018-12-28 2019-02-01 2020-02-01 transportation development Building Selection NBTA5-1 / Strategic study on Component 4: Technical Consultant Xiangshan public IBRD / 86220 Assistance and Capacity Post Qualification Open - National 295,000.00 292,593.32 Signed 2018-11-19 2018-11-12 2018-11-26 2019-01-09 2018-12-18 2019-02-08 2019-01-24 2019-03-15 2019-02-22 2020-03-14 transportation development Building Selection NBTA4 / Study on Blue Asset Component 4: Technical Consultant Management and O&M IBRD / 86220 Assistance and Capacity Post Qualification Open 295,000.00 287,627.39 Signed 2020-06-10 2020-11-03 2020-07-01 2020-08-14 2020-12-09 2020-09-13 2021-01-21 2020-10-18 2021-01-29 2021-08-14 Investment in Ninghai Building Selection NBTA7 / Study on Ningbo Component 4: Technical Quality And Cost- 2035 in Sustainable IBRD / 86220 Assistance and Capacity Post Open - International 940,000.00 0.00 Canceled 2020-09-10 2020-08-05 2020-10-09 2020-09-10 2020-11-22 2020-12-20 2021-01-19 2021-02-23 2021-03-30 2022-03-30 Based Selection Urbanization Building Component 4: Technical Consultant NBTA8 / Study on Ningbo IBRD / 86220 Assistance and Capacity Post Qualification Open 280,000.00 283,666.24 Signed 2020-09-10 2020-09-02 2020-09-30 2020-11-13 2020-12-09 2020-12-13 2021-01-08 2021-01-17 2021-03-05 2022-01-17 Urban Resilience Building Selection NBTA9 / Study and Overview Component 4: Technical of Contract Management Quality And Cost- IBRD / 86220 Assistance and Capacity Post Open - International 660,000.00 554,823.54 Signed 2020-06-30 2020-05-22 2020-07-29 2020-06-23 2020-09-11 2020-09-17 2020-10-09 2020-10-16 2020-11-08 2020-10-26 2020-12-13 2020-11-04 2021-01-17 2020-12-03 2022-01-17 introduced with WB Project Based Selection Building Management Method NBTA7-1 / Study on Ningbo Component 4: Technical Quality Based 2035 in Sustainable IBRD / 86220 Assistance and Capacity Post Open - International 940,000.00 911,107.71 Signed 2020-10-29 2020-09-11 2020-11-19 2021-01-02 2020-11-18 2021-01-30 2020-12-22 2021-03-01 2020-12-22 2021-03-31 2020-12-25 2021-05-05 2021-02-08 2022-05-05 Selection Urbanization Building INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 4: Technical NBTA6 / Flood Risk IBRD / 86220 Assistance and Capacity Post Direct Selection Direct 75,000.00 75,000.00 Signed 2019-01-04 2018-12-17 2019-01-14 2019-03-20 2018-12-20 2019-09-16 Assessment in Ninghai County Building NBTA10 / Agency service of Component 4: Technical selection and employment of IBRD / 86220 Assistance and Capacity Post Direct Selection Direct 15,000.00 14,636.90 Signed 2020-09-01 2020-09-20 2020-09-11 2020-09-06 2020-11-15 2020-09-10 2021-11-15 consultants Building NBTA11 / Investigation on Component 4: Technical spatial satisfaction, pedestrian IBRD / 86220 Assistance and Capacity Post Direct Selection Direct 60,000.00 46,418.07 Signed 2020-09-06 2020-11-02 2020-09-16 2020-10-19 2020-11-20 2020-12-03 2022-11-20 standing time and non motor Building vehicle flow Page 3