PROCUREMENT PLAN (Textual Part) Project information: [country] [Project name] [P-number] Project Implementation agency: [insert legal name] Date of the Procurement Plan: [insert date] Period covered by this Procurement Plan: [insert from – to period] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Congo, Republic of : Urban Development and Poor Neighborhood Upgrading Project PLAN General Information Country: Congo, Republic of Bank’s Approval Date of the Original Procurement Plan: 2017-06-29 2020-06-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P146933 GPN Date: 2017-11-13 Project Name: Urban Development and Poor Neighborhood Upgrading Project Loan / Credit No: IBRD / 85880 Executing Agency(ies): Urban Development and Poor Neighborhood Upgrading Project WORKS Bid Evaluation Activity Reference No. / Procurement Estimated Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification High SEA/SH Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Contract Description Component Review Type Method Document Amount Amount qualification Document / Signed Contract No. Approach Process (Y/N) Risk Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Completion Type (US$) (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CG-003-TX-AOI / Travaux de construction des voiries Integration and Open - Single Stage - Two IBRD / 85880 A priori Appel d'offres 17,100,000.00 0.00 Annulé 2018-02-22 2018-02-27 2018-04-10 2018-06-23 2018-07-28 2019-01-24 urbaines à Brazzaville et Neighborhood Upgrading International Envelope Pointe-Noire phase 2 CG-DURQUAP-005-TX-AOI / Travaux de construction des Integration and Open - Single Stage - Two voiries urbaines et IBRD / 85880 A priori Appel d'offres 8,550,000.00 8,925,555.51 Signé 2019-01-07 2019-02-15 2019-01-12 2019-02-18 2019-02-23 2019-04-30 2019-05-08 2019-06-21 2019-06-12 2019-06-15 2019-12-09 Neighborhood Upgrading International Envelope assainissement à Brazzaville Phase 1 CG-OO1-TX-AOI / Travaux de construction des voiries Integration and Open - Single Stage - Two IBRD / 85880 A priori Appel d'offres 8,550,000.00 4,403,008.38 Signé 2019-01-07 2019-02-15 2019-01-12 2019-02-18 2019-02-23 2019-05-08 2019-05-19 2019-06-12 2019-06-15 2019-12-09 urbaines et assainissement à Neighborhood Upgrading International Envelope Pointe-Noire phase 1 CG-DURQUAP-085-TX-AON / Travaux marché Soukissa- Integration and Single Stage - Two Travaux de réhabilitation du IBRD / 85880 A posteriori Appel d'offres Open - National 2,450,000.00 2,400,086.96 Signé 2019-07-05 2019-10-03 2019-07-10 2019-10-09 2019-08-21 2019-12-13 2019-11-03 2020-04-18 2019-12-08 2020-02-27 2020-06-05 Neighborhood Upgrading Envelope marché de SOUKISSA à Brazzaville CG-DURQUAP-001BIS-TX- AOI / Travaux de construction de 10,363 km des voiries urbaines par pavage, des ouvrages Integration and Open - Single Stage - One IBRD / 85880 A priori Appel d'offres 8,550,000.00 5,320,954.93 Signé 2015-12-17 2019-08-02 2015-12-22 2019-09-02 2016-02-02 2019-03-29 2016-03-03 2019-09-13 2016-04-07 2019-06-15 2016-10-04 connexes et de drainage des Neighborhood Upgrading International Envelope eaux pluviales dans les quartiers MBOUKOU (Lot 1) et TCHINIAMBI1 (Lot 2) à Pointe Noire répartis CG-DURQUAP-093-TX-CF / Project Management, Single Stage - One Travaux d’aménagement de IBRD / 85880 A posteriori Demande de prix Limited 7,000.00 8,254.42 Achevé 2019-07-27 2019-07-12 2019-09-21 2019-08-22 2020-03-19 Coordination and Evaluation Envelope bureaux CG-004-TX-AON / Travaux Eau et Elec-Travauxdans les Integration and Single Stage - Two IBRD / 85880 A posteriori Appel d'offres Open - National 3,500,000.00 0.00 Annulé 2019-04-02 2019-04-07 2019-05-19 2019-08-01 2019-09-05 2020-03-03 réseaux eau et électricité à Neighborhood Upgrading Envelope Brazzaville et Pointe-Noire CG-002-TX-AON / Travaux Erosion-Travaux de Integration and Single Stage - Two traitement des zones en IBRD / 85880 A posteriori Appel d'offres Open - National 3,000,000.00 0.00 Annulé 2019-04-02 2019-04-07 2019-05-19 2019-08-01 2019-09-05 2020-03-03 Neighborhood Upgrading Envelope proie aux érosions à Brazzaville CG-DURQUAP-084-TX-AON / Travaux Stade-Travaux de réhabilitation du stade TATA Integration and Single Stage - Two IBRD / 85880 A posteriori Appel d'offres Open - National 1,800,000.00 0.00 Annulé 2019-09-09 2019-09-14 2019-10-26 2020-01-08 2020-02-12 2020-08-10 LOBOKO à Pointe Noire au Neighborhood Upgrading Envelope quartier MBOUKOU à Pointe-Noire CG-DURQUAP-083-TX-AON / Travaux Ecoles- Travaux de réhabilitation des écoles Integration and Single Stage - Two Mountou Mavoungou et IBRD / 85880 A posteriori Appel d'offres Open - National 2,700,000.00 0.00 Annulé 2019-09-06 2019-09-11 2019-10-23 2020-01-05 2020-02-09 2020-08-07 Neighborhood Upgrading Envelope PAMBOU Benjamin à Pointe Noire au quartier TCHINIAMBI CG-DURQUAP-086-TX-AON / Travaux marche Integration and Single Stage - Two Tchiniambi- Travaux de IBRD / 85880 A posteriori Appel d'offres Open - National 2,400,000.00 0.00 Annulé 2019-09-09 2019-09-14 2019-10-26 2020-01-08 2020-02-12 2020-08-10 Neighborhood Upgrading Envelope réhabilitation du marché de TCHINIAMBI à Pointe-Noire CG-DURQUAP-004-TX-AOI / Investissement en vue de la Integration and Open - Single Stage - Two IBRD / 85880 A priori Appel d'offres 22,000,000.00 0.00 Annulé 2017-12-15 2017-12-20 2018-01-31 2018-04-15 2018-05-20 2018-11-16 restructuration-Equipement Neighborhood Upgrading International Envelope de quartiers Page 1 CG-DURQUAP-083 BIS-TX- AON / Tx Ecoles/Travaux de réhabiliation des Ecoles Integration and Single Stage - One IBRD / 85880 A posteriori Appel d'offres Open - National 3,000,000.00 0.00 Annulé 2020-04-02 2020-04-07 2020-05-19 2020-06-18 2020-07-23 2021-01-19 Mountou Mavoungou et Neighborhood Upgrading Envelope Pambou Benjamin à Pointe Noire. CG-DURQUAP-002 BIS-TX- AON / Tx Erosion-Travaux Integration and Single Stage - One de traitement de la zone en IBRD / 85880 A posteriori Appel d'offres Open - National 3,500,000.00 0.00 Annulé 2020-01-31 2020-02-05 2020-03-18 2020-04-17 2020-05-22 2020-11-18 Neighborhood Upgrading Envelope proie aux érosions à Brazzaville CG-DURQUAP-004 BIS-TX- AOI / Tx Eau et Elec- Travaux de réhabilitation Integration and Open - Single Stage - One IBRD / 85880 A priori Appel d'offres 12,000,000.00 0.00 Annulé 2020-04-13 2020-04-18 2020-05-30 2020-06-29 2020-08-03 2021-01-30 des réseaux eau et Neighborhood Upgrading International Envelope électricité à Brazzaville et à pointe-Noire CG-DURQUAP-086 BIS-TX- AON / Tx Marché Integration and Single Stage - One Tchi/Travaux de IBRD / 85880 A posteriori Appel d'offres Open - National 1,000,000.00 0.00 Annulé 2020-04-18 2020-04-23 2020-06-04 2020-07-04 2020-08-08 2021-02-04 Neighborhood Upgrading Envelope réhabilitation marché Tchiniambi à Pointe Noire CG-DURQUAP-084 BIS-TX- AON / Tx-Stade/Travaux de Integration and Single Stage - One réhabilitation du stade TATA IBRD / 85880 A priori Appel d'offres Open - National 8,000,000.00 0.00 Annulé 2020-04-02 2020-04-07 2020-05-19 2020-06-18 2020-07-23 2021-01-19 Neighborhood Upgrading Envelope LOBOKO au quartier Mboukou à Pointe-Noire CG-DURQUAP- 005 BIS-TX- AOI / Travaux de construction de 10,211 km des voiries urbaines par pavage, des ouvrages Integration and Open - Single Stage - One connexes et de drainage des IBRD / 85880 A priori Appel d'offres 8,550,000.00 0.00 Annulé 2015-11-10 2015-11-15 2015-12-27 2016-01-26 2016-03-01 2016-08-28 Neighborhood Upgrading International Envelope eaux pluviales dans les quartiers SUKISSA (Lot 1) et MOUKOUNDZI NGOUAKA (Lot 2) à Brazzaville GOODS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CG-002-F-CF / Acquisition Integration and Single Stage - One IBRD / 85880 A posteriori Demande de prix Limited 7,060.00 13,698.03 Achevé 2017-10-25 2018-01-12 2017-12-20 2018-04-05 2018-06-18 2018-06-23 Matériel Informatique UC Neighborhood Upgrading Envelope CG-DURQUAP-003-BIS-F-CF Integration and Single Stage - One IBRD / 85880 A posteriori Demande de prix Limited 211,000.00 196,458.63 Achevé 2017-09-18 2018-02-15 2017-11-14 2018-03-29 2018-05-13 2018-04-25 / Acquisition véhicules UC Neighborhood Upgrading Envelope CG-003-F-CF / Acquisition Integration and Single Stage - One IBRD / 85880 A posteriori Demande de prix Open - National 400,000.00 0.00 Annulé 2017-07-05 2017-08-30 2018-02-26 véhicules UC Neighborhood Upgrading Envelope CG-DURQUAP-001-F-CF / Integration and Single Stage - One IBRD / 85880 A posteriori Demande de prix Limited 4,000.00 4,725.52 Achevé 2017-11-25 2018-01-11 2018-01-20 2018-04-05 2018-07-19 2018-06-23 Équipement de bureau Neighborhood Upgrading Envelope CG-DURQUAP-039-F-CF / Fourniture de Bureau- Acquisition des fournitures Project Management, Single Stage - One de bureau et consommables IBRD / 85880 A posteriori Demande de prix Limited 30,000.00 29,659.39 Signé 2018-07-30 2018-07-28 2018-09-24 2018-08-24 2019-03-23 Coordination and Evaluation Envelope informatiques (marché à bon de commande ou à prix unitaire) CG-DURQUAP-040-F-CF / Reprographie-Acquisition complémentaire des matériels de reprographies, Project Management, Single Stage - One IBRD / 85880 A posteriori Demande de prix Limited 40,000.00 31,343.26 Achevé 2018-07-30 2018-08-10 2018-09-24 2018-09-06 2019-03-23 2018-11-21 d'informatique et des Coordination and Evaluation Envelope mobiliers de bureau pour l'Unité de Coordination DURQuaP CG-DURQUAP-041-F-CF / Traiteur Brazzaville- Contractualisation avec un service traiteur dans le Project Management, Single Stage - One IBRD / 85880 A posteriori Demande de prix Limited 10,000.00 8,651.50 Signé 2018-08-05 2018-12-20 2018-09-30 2019-02-19 2019-03-29 cadre de la mise en œuvre Coordination and Evaluation Envelope DURQuaP à Brazzaville (marché à bon de commande ou à prix unitaire CG-DURQUAP-043-F-ED / Télécom Internet- Passation de Project Management, Contractualisation avec un IBRD / 85880 A posteriori marché de gré à Direct 10,000.00 65,709.84 Signé 2018-07-24 2019-02-22 2018-07-29 2019-02-28 2018-09-02 2019-06-24 2019-03-01 Coordination and Evaluation fournisseur de l'internet au gré bureau de l'UCP DURQuaP Page 2 CG-DURQUAP-061-F-ED / Serveur + Tablettes- Passation de Acquisition de 30 tablettes Project Management, IBRD / 85880 A posteriori marché de gré à Direct 25,000.00 25,213.09 Achevé 2018-12-05 2019-02-28 2018-12-10 2019-02-28 2019-01-14 2019-03-27 2019-07-13 2019-07-09 et un serveur pour stockage Coordination and Evaluation gré des donnees d'enquetes et comptables du projet CG-DURQUAP-088-F-ED / Passation de Location Bureaux DURQuaP Integration and IBRD / 85880 A posteriori marché de gré à Direct 70,000.00 76,916.34 Signé 2019-01-01 2019-01-28 2019-01-06 2019-02-26 2019-02-10 2019-01-18 2019-08-09 aupres de la societe C.T Neighborhood Upgrading gré (proprietaire du Loyer) CG-DURQUAP-090-F-CF / Acquisition du mobilier de bureau destiné au RAFC et Project Management, Single Stage - One à l’Auditeur Interne et le IBRD / 85880 A posteriori Demande de prix Limited 30,000.00 26,783.86 Achevé 2019-07-27 2019-07-12 2019-09-21 2019-08-22 2020-03-19 2019-09-19 Coordination and Evaluation Envelope meuble de rangement des documents du service de la Passation des marchés CG-DURQUAP-091-F-CF / Acquisition du matériel informatique et de Project Management, Single Stage - One reprographie destiné au IBRD / 85880 A posteriori Demande de prix Limited 15,000.00 8,401.39 Achevé 2019-07-27 2019-07-12 2019-09-21 2019-08-22 2020-03-19 2019-09-02 Coordination and Evaluation Envelope RAFC, à l’Auditeur Interne et à l’Assistant en passation des marchés CG-DURQUAP-042-F-CF / Traiteur Pointe Noire- Contractualisation avec un service traiteur dans le Project Management, Single Stage - One IBRD / 85880 A posteriori Demande de prix Limited 10,000.00 0.00 Annulé 2018-08-05 2018-09-30 2019-03-29 cadre de la mise en œuvre Coordination and Evaluation Envelope DURQuaP à Pointe Noire (marché à bon de commande ou à prix unitaire) CG-DURQUAP-045-F-ED / Publications- Contractualisation avec des Passation de Project Management, sociétés de publication des IBRD / 85880 A posteriori marché de gré à Direct 10,000.00 0.00 Annulé 2018-07-24 2018-07-29 2018-09-02 2019-03-01 Coordination and Evaluation avis d'appel d'offres et des gré avis de manifestation d'intérêt au Congo CG-DURQUAP-044-F-ED / Carburant-Contractualisation avec une société de livraison Passation de Project Management, du carburant pour les IBRD / 85880 A posteriori marché de gré à Direct 20,000.00 0.00 Annulé 2018-07-23 2019-02-22 2018-07-28 2019-02-28 2018-09-01 2019-02-28 Coordination and Evaluation véhicules DURQuaP (marché gré à bon de commande ou à prix unitaire) CG-DURQUAP-123-F-CF / Acquisition des mobiliers de bureau et matériel informatique du personnel complémentaire de Project Management, Single Stage - One En attente l'UCP/DURQuaP IBRD / 85880 A posteriori Demande de prix Limited 100,000.00 0.00 2020-08-05 2020-09-30 2021-03-29 Coordination and Evaluation Envelope d'exécution (Ingénieur junior en génie, spécialiste en sauvegardes sociales et assistant technique international en passation des marchés) CG-DURQUAP-122-F-AON / Fourniture et installation des équipements et logiciels pour la mission de mise en place d'un observatoire Development of Institutions Single Stage - One En attente urbain, la réalisation de IBRD / 85880 A posteriori Appel d'offres Open - National 800,000.00 0.00 2020-08-05 2020-08-10 2020-09-21 2020-10-21 2020-11-25 2021-05-24 and Capacity Envelope d'exécution l'adressage et l'actualisation de la base des données des impôts et des recettes municipales dans les villes de BZV et PN NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CG-DURQUAP-094-SASC-DP / Surveillance et gardiennage des locaux de l’Unité de Coordination du Projet de Project Management, Single Stage - One IBRD / 85880 A posteriori Demande de prix Limited 30,000.00 51,921.25 Signé 2019-10-22 2019-10-23 2019-12-17 2019-10-29 2020-06-14 Développement Urbain et de Coordination and Evaluation Envelope Restructuration des Quartiers Précaires (DURQuaP). Page 3 CG-DURQUAP-110-SASC-CF / Conception infographique, impression et diffusion du Project Management, Single Stage - One En attente IBRD / 85880 A posteriori Demande de prix Limited 10,000.00 0.00 2020-03-07 2020-05-02 2020-10-29 bulletin d'information Coordination and Evaluation Envelope d'exécution trimensuel du projet DURQuaP CG-DURQUAP-113-SASC- ED / Local centre d'appel- ED/Contractualisation par Passation de Integration and entente directe avec la IBRD / 85880 A posteriori marché de gré à Direct 16,000.00 15,781.06 Signé 2020-03-02 2020-03-13 2020-03-07 2020-03-19 2020-04-11 2020-03-19 2020-10-08 Neighborhood Upgrading société CT pour la location gré du local du centre d'appel du DURQuaP CG-DURQUAP-119-SASC-CF / Installation serveur/Recrutement d'un Project Management, Single Stage - One consultant pour le câblage et IBRD / 85880 A posteriori Demande de prix Limited 29,000.00 29,035.04 Signé 2020-03-15 2020-05-15 2020-05-10 2020-05-16 2020-11-06 Coordination and Evaluation Envelope l'installation du serveur d’hébergement des données du DURQuaP. CG-DURQUAP-118-SASC-DP / Entretien Bureaux/Recrutement de Project Management, Single Stage - One En cours IBRD / 85880 A posteriori Demande de prix Limited 10,000.00 0.00 2020-03-21 2020-06-02 2020-05-16 2020-11-12 deux (02) techniciens de Coordination and Evaluation Envelope d'exécution surface pour le nettoyage des bureaux du DURQuaP CG-DURQUAP-111-SASC-CF / Production des objets Project Management, Single Stage - One promotionnels (plaquettes IBRD / 85880 A posteriori Demande de prix Limited 35,000.00 0.00 Annulé 2020-03-17 2020-05-12 2020-11-08 Coordination and Evaluation Envelope institutionnelles, kakemonos, teeshoirts, casquettes, etc) CONSULTING FIRMS Activity Reference No. / Short List and Draft Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Request for Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Request for Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Interest Notice Proposals as Issued Proposals / Minutes Technical Proposal Proposals Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CG-023-SC-QC / Notice d'Impact Environnemental et Sélection fondée Social (NIES) pour la Integration and sur les Open - IBRD / 85880 A posteriori 150,000.00 154,644.09 Signé 2017-10-05 2017-10-26 2017-12-09 2018-01-08 2018-12-19 2018-02-12 2018-08-02 2018-08-11 construction des voiries Neighborhood Upgrading qualifications des International urbaines par pavage à consultants Brazzaville et Pointe-Noire. CG-014-SC-SFQC / Sélection fondée Supervision travaux de Integration and Open - IBRD / 85880 A priori sur la qualité et 1,710,000.00 0.00 Annulé 2017-10-23 2017-11-13 2017-12-27 2018-01-24 2018-02-23 2018-03-30 2018-05-04 2019-05-04 voiries programme prioritaire Neighborhood Upgrading International le coût phase 2 CG-DURQUAP-013-BIS-SC- Sélection fondée Integration and Open - SFQC / Audit-Recrutement IBRD / 85880 A priori sur la qualité et 100,000.00 40,116.16 Signé 2017-08-01 2017-08-26 2017-10-24 2018-06-21 2017-11-21 2018-08-10 2017-12-21 2018-09-07 2018-01-25 2019-01-29 2018-03-01 2019-02-15 2019-03-01 Neighborhood Upgrading International Auditeur externe le coût CG-DURQUAP-001-BIS-SC- QC / Voiries-Etudes Sélection fondée techniques et DAO des Integration and sur les travaux de voiries et IBRD / 85880 A posteriori Open - National 250,000.00 285,419.14 Achevé 2017-08-03 2018-04-28 2017-08-14 2017-10-18 2017-11-17 2018-06-15 2017-12-22 2018-04-05 2018-06-20 2018-12-27 Neighborhood Upgrading qualifications des d'assainissement à consultants Brazzaville et à Pointe-Noire Phase1 CG-DURQUAP-002-BIS-SC- Sélection fondée QC / NIES site érosif-Notice Integration and sur les d'Impact Environnemental et IBRD / 85880 A posteriori Open - National 85,000.00 82,376.22 Signé 2017-08-01 2019-02-26 2017-08-14 2017-09-28 2019-04-05 2017-10-28 2019-04-05 2017-12-02 2018-08-31 2018-05-31 Neighborhood Upgrading qualifications des Social (NIES) pour le site consultants érosif à Brazzaville CG-002-SC-QC / Notices d'impact environnemental et Sélection fondée social des travaux de Integration and sur les Open - construction des voiries IBRD / 85880 A posteriori 200,000.00 0.00 Annulé 2017-07-05 2017-08-01 2017-07-26 2017-08-12 2017-09-08 2017-10-08 2017-11-12 2018-05-11 Neighborhood Upgrading qualifications des International urbaines, réseaux eau et consultants électricité et des ouvrages antiérosifs CG-001-SC-SFQC / Etudes techniques des travaux phase1et DAO des travaux Sélection fondée Integration and de construction des voiries IBRD / 85880 A posteriori sur la qualité et Open - National 385,000.00 0.00 Annulé 2017-07-28 2017-08-03 2017-08-18 2017-08-12 2017-10-01 2017-10-29 2017-11-28 2018-01-02 2018-02-06 2019-02-06 Neighborhood Upgrading urbaines et assainissement à le coût Brazzaville et Pointe-Noire phase1 CG-DURQUAP-004-SC-QC / Etudes techniques et DAO Sélection fondée des travaux de construction Integration and sur les IBRD / 85880 A posteriori Open - National 300,000.00 0.00 Annulé 2017-12-20 2018-02-07 2018-01-10 2018-02-23 2018-03-25 2018-04-29 2018-10-26 des voiries urbaines à Neighborhood Upgrading qualifications des Brazzaville et Pointe-Noire consultants phase 2 Page 4 CG-005-SC-SFQC / Services Sélection fondée de consultant pour la Integration and Open - IBRD / 85880 A priori sur la qualité et 1,754,000.00 1,150,940.02 Signé 2018-04-06 2018-05-18 2018-04-13 2018-07-25 2018-05-27 2018-09-20 2018-06-24 2018-07-24 2018-12-25 2018-08-28 2019-02-05 2018-10-02 2019-02-11 2019-10-02 maîtrise d'œuvre sociale à Neighborhood Upgrading International le coût Brazzaville CG-DURQUAP-014-SC-SFQC / Maîtrise d'oeuvre-Services Sélection fondée Integration and Open - de consultant pour la IBRD / 85880 A priori sur la qualité et 1,754,000.00 1,129,197.47 Signé 2018-04-06 2018-05-18 2018-04-13 2018-07-25 2018-05-27 2018-09-20 2018-06-24 2018-07-24 2018-12-25 2018-08-28 2019-02-05 2018-10-02 2019-02-11 2019-10-02 Neighborhood Upgrading International maîtrise d'œuvre sociale le coût Pointe-Noire CG-006-SC-SFQC / Sélection fondée Supervision travaux de Integration and Open - IBRD / 85880 A priori sur la qualité et 855,000.00 402,833.08 Signé 2018-04-09 2018-05-11 2018-04-16 2018-05-18 2018-05-30 2018-06-27 2018-07-27 2019-07-08 2018-08-31 2019-11-27 2018-10-05 2019-11-29 2019-10-05 voiries programme prioritaire Neighborhood Upgrading International le coût phase 1 à Brazzaville CG-DURQUAP-034-SC-SFQC Sélection fondée / Supervision travaux de Integration and Open - IBRD / 85880 A priori sur la qualité et 855,000.00 403,431.62 Signé 2018-04-09 2018-04-23 2018-04-16 2018-05-18 2018-05-30 2018-06-27 2018-07-27 2019-07-08 2018-08-31 2019-11-27 2018-10-05 2019-11-29 2019-10-05 voiries programme prioritaire Neighborhood Upgrading International le coût phase1 à Pointe Noire CG-DURQUAP-003-SC-QC / Sélection fondée Réseaux BZV-Études Integration and sur les techniques et DAO pour les IBRD / 85880 A posteriori Open - National 150,000.00 233,096.02 Signé 2018-05-28 2018-06-11 2018-06-18 2018-06-12 2018-08-01 2018-12-21 2018-08-31 2019-02-27 2018-10-05 2018-12-14 2019-04-03 Neighborhood Upgrading qualifications des réseaux eau et électricité à consultants Brazzaville CG-DURQUAP-030-SC-QC / Sélection fondée Plan Com-Recrutement d'un Integration and sur les consultant pour l'élaboration IBRD / 85880 A posteriori Open - National 200,000.00 90,294.25 Achevé 2018-06-08 2018-06-15 2018-06-22 2018-07-29 2018-10-14 2018-08-28 2018-12-17 2018-10-02 2018-10-25 2019-03-31 2019-05-06 Neighborhood Upgrading qualifications des du plan de communication consultants du Projet CG-DURQUAP-035-SC-QC / Sélection fondée Réseaux PNR-Etudes Integration and sur les techniques et DAO pour les IBRD / 85880 A posteriori Open - National 150,000.00 208,350.77 Signé 2018-05-28 2018-06-18 2018-06-12 2018-08-01 2019-02-27 2018-08-31 2019-02-27 2018-10-05 2018-12-14 2019-04-03 Neighborhood Upgrading qualifications des réseaux eau et électricité à consultants Pointe-Noire CG-DURQUAP-028-SC-QC / PAR voiries BZV-Réalisation Sélection fondée d'un plan d'action de Integration and sur les réinstallation (PAR) des IBRD / 85880 A posteriori Open - National 75,000.00 0.00 Annulé 2018-08-30 2018-08-24 2018-09-20 2018-11-03 2018-12-03 2019-01-07 2019-07-06 Neighborhood Upgrading qualifications des travaux de construction des consultants voiries par pavage à Brazzaville CG-DURQUAP-051-SC-QC / NIES SUKISSA-Notice Sélection fondée d'Impact environnemental et Project Management, sur les IBRD / 85880 A posteriori Open - National 125,000.00 107,757.50 Signé 2018-12-10 2018-12-29 2018-12-31 2019-02-13 2019-02-22 2019-03-15 2019-03-15 2019-04-19 2019-03-19 2019-10-16 social pour la construction Coordination and Evaluation qualifications des du marché de SUKISSA à consultants Brazzaville. CG-DURQUAP-052-SC-QC / Etudes marché de TCHINIAMBI-Recrutement Sélection fondée d'un consultant pour la Integration and sur les réalisation des études IBRD / 85880 A posteriori Open - National 400,000.00 404,717.47 Signé 2018-12-10 2019-04-12 2018-12-31 2019-06-25 2019-02-13 2019-08-26 2019-03-15 2019-11-25 2019-04-19 2019-11-20 2019-10-16 Neighborhood Upgrading qualifications des techniques, DAO et chargé consultants de la supervision des travaux de rahabilitation du marché TCHINIAMBI. CG-DURQUAP-053-SC-QC / NIES marche TCHINIAMBI- Sélection fondée Notice d'Impact Project Management, sur les En cours Environnemental et Social IBRD / 85880 A posteriori Open - National 120,000.00 0.00 2018-12-10 2019-12-06 2018-12-31 2019-02-13 2019-03-15 2019-04-19 2019-10-16 Coordination and Evaluation qualifications des d'examen (NIES) pour la construction consultants du marché de TCHINIAMBI à Pointe-Noire. CG-DURQUAP-054-SC-QC / NIES Eau et Electricité - Recrutement d'un consultant pour la réalisation de la Sélection fondée notice d'impact Project Management, sur les IBRD / 85880 A posteriori Open - National 200,000.00 164,617.02 Signé 2018-12-05 2019-10-09 2018-12-26 2019-10-29 2019-02-08 2020-05-17 2019-03-10 2020-05-18 2019-04-14 2020-03-26 2019-10-11 environnemental et social Coordination and Evaluation qualifications des (NIES) des réseaux eau et consultants électricité à Brazzaville et à Pointe Noire dans les quartiers cibles du projet. CG-DURQUAP-056-SC-QC / Etudes et DAO ecoles- Recrutement d'un consultant pour la réalisation des Sélection fondée études techniques, DAO et Integration and sur les IBRD / 85880 A posteriori Open - National 450,000.00 455,075.98 Signé 2018-12-13 2019-03-20 2018-12-20 2019-03-22 2019-02-02 2019-08-09 2019-03-04 2019-09-26 2019-04-08 2019-09-06 2019-10-05 chargé de la supervision des Neighborhood Upgrading qualifications des travaux de réhabilitation des consultants écoles MOUTOU MAVOUNGOU et PAMBOU Benjamin à Pointe Noire Page 5 CG-DURQUAP-059-SC-QC / NIES stade TATA LOBOKO- Recrutement d'un consultant Sélection fondée pour la réalisation de la Project Management, sur les En cours notice d'impact IBRD / 85880 A posteriori Open - National 160,000.00 0.00 2018-12-18 2019-12-06 2018-12-23 2019-02-05 2019-03-07 2019-04-11 2019-10-08 Coordination and Evaluation qualifications des d'examen environnemental et social consultants (NIES) du stade TATA LOBOKO à Pointe Noire au quartier MBOUKOU. CG-DURQUAP-058-SC-QC / NIES ecoles-Recrutement d'un consultant pour la Sélection fondée réalisation de la notice Project Management, sur les En cours d'impact environnemental et IBRD / 85880 A posteriori Open - National 200,000.00 0.00 2018-12-13 2019-12-06 2018-12-20 2019-02-02 2019-03-04 2019-04-08 2019-10-05 Coordination and Evaluation qualifications des d'examen social (NIES) des écoles consultants MOUTOU et de l'école PAMBOU Benjamin à Pointe Noire à Pointe Noire CG-DURQUAP-062-SC-SFQ / Diagnostic-Recrutement d'un consultant pour la réalisation de l'étude diagnostique institutionnel Project Management, Sélection fondée Open - En cours IBRD / 85880 A priori 1,300,000.00 0.00 2018-12-06 2019-02-09 2018-12-14 2019-04-10 2019-01-27 2019-11-13 2019-02-24 2020-04-16 2019-03-26 2020-06-02 2019-04-25 2019-05-30 2020-05-29 du secteur urbain, soutien Coordination and Evaluation sur la qualité International d'exécution institutionnel et renforcement des capacités du Ministère de la Construction de l'Urbanisme et de l'Habitat CG-009-SC-SFQC / Élaboration des Plans de Sélection fondée restructuration de quartiers Integration and IBRD / 85880 A priori sur la qualité et Open - National 3,000,000.00 0.00 Annulé 2018-04-10 2018-04-17 2018-05-31 2018-06-28 2018-07-28 2018-09-01 2018-10-06 2019-10-06 et programmes prioritaires Neighborhood Upgrading le coût de Brazzaville et Pointe- Noire phase 1 CG-DURQUAP-015BIS-SC- SFQ / Plans-Recrutement d'un consultant pour la réalisation des Plans Directeurs d'Urbanisme (PDU), des Plans Project Management, Sélection fondée Open - d'Urbanisme de Detail (PUD) IBRD / 85880 A priori 6,800,000.00 2,916,766.86 Signé 2018-12-07 2018-12-19 2018-12-12 2018-12-25 2019-01-25 2019-05-10 2019-02-22 2019-06-28 2019-03-24 2019-07-15 2019-04-23 2019-11-26 2019-05-28 2019-12-04 2020-05-27 Coordination and Evaluation sur la qualité International et des Plans de Restructuration des Quartiers (PRQ) et programmes d'investissement de Brazzaville et de Pointe Noire. CG-DURQUAP-022BIS-SC- SFQ / Adressage- Recrutement d'un consultant pour la realisation de l'adressage et de l'actualisation de la base de Project Management, Sélection fondée Open - IBRD / 85880 A priori 2,000,000.00 0.00 Annulé 2018-12-09 2019-01-20 2018-12-14 2019-01-24 2019-01-27 2019-05-10 2019-02-24 2019-06-28 2019-03-26 2019-12-01 2019-04-25 2019-05-30 2020-05-29 donnees relatives aux impots Coordination and Evaluation sur la qualité International municipaux, du recouvrement des recettes et de l'observatoire urbain à Brazzaville et à Pointe Noire  CG-016-SC-SFQC / Sélection fondée Assistance technique aux Integration and IBRD / 85880 A posteriori sur la qualité et Open - National 480,000.00 0.00 Annulé 2018-05-23 2018-05-30 2018-07-13 2018-08-10 2018-09-09 2018-10-14 2018-11-18 2019-11-18 municipalités de Brazzaville Neighborhood Upgrading le coût et Pointe-Noire CG-020-SC-SFQC / Legislation et reglementation- Recrutement d'un consultant Sélection fondée pour l'application de la Project Management, Open - En cours IBRD / 85880 A priori sur la qualité et 500,000.00 0.00 2019-04-30 2019-02-08 2019-05-07 2019-02-11 2019-06-20 2019-11-04 2019-07-18 2020-05-25 2019-08-17 2019-09-21 2019-10-26 2020-10-25 legislation et de la Coordination and Evaluation International d'examen le coût reglementation actualisees en matière d'urbanisme et d'habitat CG-DURQUAP-027-SC-QC / Sélection fondée Outils de Sauvegarde-Etudes Integration and sur les pour la réalisation des outils IBRD / 85880 A posteriori Open - National 100,000.00 0.00 Annulé 2018-05-15 2018-06-05 2018-07-19 2018-08-18 2018-09-22 2019-03-21 Neighborhood Upgrading qualifications des de sauvegarde sociale du consultants site en proie aux érosions CG-DURQUAP-029-SC-QC / Outils de sauvegarde Eau et Electricité-Etudes pour la Sélection fondée réalisation des outils de Integration and sur les IBRD / 85880 A posteriori Open - National 200,000.00 0.00 Annulé 2018-05-31 2018-06-21 2018-08-04 2018-09-03 2018-10-08 2019-04-06 sauvegarde sociale relatives Neighborhood Upgrading qualifications des aux travaux de réseaux eau consultants et électricité à Brazzaville et Pointe-Noire CG-DURQUAP-064-SC-QC / Supervision travaux Eau et Sélection fondée Elec-Recrutement d'un Integration and sur les Open - En cours consultant chargé de la IBRD / 85880 A posteriori 250,000.00 0.00 2019-05-13 2020-05-19 2019-05-27 2020-05-29 2019-07-10 2019-08-09 2019-09-13 2020-03-11 Neighborhood Upgrading qualifications des International d'exécution supervision des travaux de consultants réseaux eau et électricité à Brazzaville et Pointe-Noire Page 6 CG-DURQUAP-067-SC-QC / Supervision Marché Soukissa- Sélection fondée Recrutement d'un consultant Integration and sur les charge de la supervision des IBRD / 85880 A posteriori Open - National 250,000.00 222,532.57 Signé 2019-03-22 2019-10-11 2019-03-29 2019-10-29 2019-05-12 2020-04-24 2019-06-11 2020-05-18 2019-07-16 2020-05-07 2020-01-12 Neighborhood Upgrading qualifications des travaux de réinstallation du consultants marché de SOUKISSA à Brazzaville CG-DURQUAP-007BIS-SC- QC / Actualisation Etudes Sélection fondée erosion-Recrutement d'un Integration and sur les Open - consultant chargé de IBRD / 85880 A posteriori 300,000.00 300,428.73 Signé 2018-03-23 2019-07-29 2018-03-30 2018-05-13 2019-08-12 2018-06-12 2019-08-14 2018-07-17 2019-06-28 2019-01-13 Neighborhood Upgrading qualifications des International l'actualisation des études de consultants la zone en proie aux érosions à Brazzaville CG-DURQUAP-007-SC-QC / Sélection fondée Contrôle Érosion-Supervision Integration and sur les travaux de traitement de la IBRD / 85880 A posteriori Open - National 250,000.00 0.00 Annulé 2018-03-16 2018-03-26 2018-03-22 2018-03-30 2018-05-05 2018-06-04 2018-07-09 2019-01-05 Neighborhood Upgrading qualifications des zone en proie aux érosions à consultants Brazzaville CG-DURQUAP-057-SC-QC / Supervision stade TATA LOBOKO-Recrutement d'un Sélection fondée consultant chargé de la Integration and sur les En cours IBRD / 85880 A posteriori Open - National 250,000.00 0.00 2019-01-01 2019-12-31 2019-01-05 2020-01-03 2019-02-18 2019-03-20 2019-04-24 2019-10-21 supervision des travaux de Neighborhood Upgrading qualifications des d'exécution réhabilitation du stade TATA consultants LOBOKO à Pointe Noire au quartier MBOUKOU CG-DURQUAP-004-BIS-SC- QC / Etudes stade TATA LOBOKO: Recrutement d'un Sélection fondée consultant pour la Integration and sur les realisation des etudes IBRD / 85880 A posteriori Open - National 200,000.00 302,438.12 Signé 2018-12-27 2018-12-21 2019-01-03 2019-01-04 2019-02-16 2019-05-24 2019-03-18 2019-05-24 2019-04-22 2019-05-21 2019-10-19 Neighborhood Upgrading qualifications des techniques et DAO pour la consultants rehabilitation du stade TATA LOBOKO a Pointe-Noire au quartier MBOUKOU CG-022-SC-SFQC / Services Sélection fondée de consultant pour la Integration and Open - IBRD / 85880 A priori sur la qualité et 800,000.00 0.00 Annulé 2018-07-24 2018-10-25 2018-07-31 2018-09-13 2018-10-11 2018-11-10 2018-12-15 2019-01-19 2020-01-19 réalisation de l'adressage à Neighborhood Upgrading International le coût Brazzaville et Pointe-Noire CG-015-SC-SFQC / Plans Sélection fondée directeurs d'urbanisme Integration and Open - IBRD / 85880 A priori sur la qualité et 800,000.00 0.00 Annulé 2018-08-24 2018-10-25 2018-08-31 2018-10-14 2018-11-11 2018-12-11 2019-01-15 2019-02-19 2020-02-19 détaillés de Brazzaville et Neighborhood Upgrading International le coût Pointe-Noire CG-013-SC-SFQC / Sélection fondée Integration and Recrutement Auditeur IBRD / 85880 A priori sur la qualité et Open - National 100,000.00 0.00 Annulé 2017-06-30 2017-08-03 2017-07-21 2018-08-15 2017-09-03 2017-10-01 2017-10-31 2017-12-05 2018-01-09 2019-01-09 Neighborhood Upgrading externe le coût CG-DURQUAP-101-SC-QC / RECRUTEMENT D’UN CONSULTANT POUR LA MISE EN PLACE D’UN Sélection fondée CENTRE D’APPEL Project Management, sur les AFFECTE AU IBRD / 85880 A posteriori Open - National 300,000.00 228,012.82 Signé 2019-07-25 2019-06-27 2019-08-15 2019-09-06 2019-09-28 2019-11-18 2019-10-28 2020-02-13 2019-12-02 2020-01-27 2020-05-30 Coordination and Evaluation qualifications des TRAITEMENT DES consultants PLAINTES ENREGISTREES VIA LE NUMERO VERT, POUR LE COMPTE DU PROJET DURQUAP CG-DURQUAP-097-SC-SFQC / Ecoles SORBONNE- Recrutement d'un consultant pour la réalisation des études techniques et DAO et Sélection fondée Integration and En cours le contrôle-supervision des IBRD / 85880 A posteriori sur la qualité et Open - National 350,000.00 0.00 2019-11-15 2019-11-03 2019-12-06 2019-11-22 2020-01-19 2020-06-06 2020-02-16 2020-03-17 2020-04-21 2020-05-26 2021-05-26 Neighborhood Upgrading d'exécution travaux de réhabilitation des le coût écoles primaires SORBONNE et MALONGA ECOUTE à Mounkoundzi NGOUAKA à Brazzaville. CG-DURQUAP-102-SC-QC / Complexe sportif Soukissa/Recrutement d'un Sélection fondée consultant pour les études Integration and sur les En attente IBRD / 85880 A posteriori Open - National 300,000.00 0.00 2020-02-13 2020-03-05 2020-04-18 2020-05-18 2020-06-22 2020-12-19 techniques, le Contrôle et la Neighborhood Upgrading qualifications des d'exécution supervision des travaux de consultants réhabilitation du complexe sportif Soukissa Brazzaville. CG-DURQUAP-060-SC-SFQ / Reorganisation volet gestion financiere- Recrutement d'un consultant Project Management, Sélection fondée Open - pour la réorganisation IBRD / 85880 A priori 1,000,000.00 0.00 Annulé 2018-12-07 2018-12-11 2019-01-24 2019-02-21 2019-03-23 2019-04-22 2019-05-27 2020-05-26 Coordination and Evaluation sur la qualité International fonctionnelle des deux administrations municipales et Volet Gestion financière dans les deux municipalités Page 7 CG-021-SC-SFQC / Assistance MCUH et CGMP- Recrutement d'un consultant Sélection fondée Project Management, Open - pour une assistante IBRD / 85880 A priori sur la qualité et 900,000.00 0.00 Annulé 2018-12-18 2018-12-24 2019-02-06 2019-03-06 2019-04-05 2019-05-10 2019-06-14 2020-06-13 Coordination and Evaluation International technique et de renforcement le coût des capacités du MCUH et de la CGMP de la DGGT CG-DURQUAP-009BIS-SC- SFQC / Logiciel Simba- Recrutement d'un consultant pour la realisation du volet Sélection fondée Project Management, Open - gestion financiere et de IBRD / 85880 A priori sur la qualité et 1,200,000.00 0.00 Annulé 2018-12-21 2018-12-28 2019-02-10 2019-03-10 2019-04-09 2019-05-14 2019-06-18 2020-06-17 Coordination and Evaluation International l'application du logiciel le coût Simba dans les deux municipalités de Brazzaville et de Pointe Noire  CG-DURQUAP-017BIS-SC- QC / Formation Mairies- Sélection fondée Recrutement d'un consultant Project Management, sur les pour la formation des agents IBRD / 85880 A posteriori Open - National 300,000.00 0.00 Annulé 2019-01-15 2019-01-19 2019-03-04 2019-04-03 2019-05-08 2019-11-04 Coordination and Evaluation qualifications des municipaux et des élus des consultants municipalités de Brazzaville et de Pointe Noire CG-DURQUAP-017 BIS1-SC- SFQC / Formation Elus locaux-Recrutement d'un Sélection fondée consultant pour la formation Development of Institutions Open - En attente IBRD / 85880 A priori sur la qualité et 1,000,000.00 0.00 2020-02-27 2020-03-19 2020-05-02 2020-05-30 2020-06-29 2020-08-03 2020-09-07 2021-09-07 des agents municipaux et and Capacity International d'exécution le coût des élus locaux et renforcement des capacités en fonction de la demande CG-DURQUAP-104-SC-QC / Sélection fondée Formation du personnel Development of Institutions sur les En attente IBRD / 85880 A posteriori Open - National 200,000.00 0.00 2020-03-18 2020-04-08 2020-05-22 2020-06-21 2020-07-26 2021-01-22 d’entreprises privées et des and Capacity qualifications des d'exécution cabinets de consultants consultants CG-DURQUAP-108-SC-QC / NIES voiries 2/Actualisation des études des Notice Sélection fondée d'Impact Environnementale Integration and sur les En cours et Sociale (NIES ) des IBRD / 85880 A posteriori Open - National 120,000.00 0.00 2020-03-05 2020-03-13 2020-03-26 2020-05-29 2020-05-09 2020-06-08 2020-07-13 2021-01-09 Neighborhood Upgrading qualifications des d'exécution voiries (phase 1) pour la consultants construction des voiries phase 2 à Brazzaville et Pointe-Noire CG-DURQUAP-022BIS1-SC- SFQ / Adressage- Recrutement d'un consultant pour la realisation de l'adressage et de Development of Institutions Sélection fondée Open - l'actualisation de la base de IBRD / 85880 A priori 2,000,000.00 2,224,895.98 Signé 2020-03-26 2020-03-11 2020-03-31 2020-05-14 2020-03-11 2020-06-11 2020-03-11 2020-07-11 2020-03-11 2020-08-10 2020-05-25 2020-09-14 2020-06-09 2021-09-14 and Capacity sur la qualité International donnees relatives aux impots municipaux, du recouvrement des recettes et de l'observatoire urbain à Brazzaville et à Pointe Noire CG-DURQUAP-066-SC-SFQC / Supervision Stade- Recrutement d'un consultant Sélection fondée chargé de la supervision des Integration and En attente IBRD / 85880 A posteriori sur la qualité et Open - National 300,000.00 0.00 2020-03-25 2020-04-15 2020-05-29 2020-06-26 2020-07-26 2020-08-30 2020-10-04 2021-10-04 travaux de réhabilitation du Neighborhood Upgrading d'exécution le coût stade TATA LOBOKO à Pointe Noire au quartier MBOUKOU CG-DURQUAP-027BIS-SC- SFQC / Recrutement d'un consultant pour la mission de gestion du patrimoine Sélection fondée Development of Institutions Open - En cours urbain et de l’assistance IBRD / 85880 A priori sur la qualité et 2,200,000.00 0.00 2020-03-14 2020-04-04 2020-05-18 2020-06-15 2020-07-15 2020-08-19 2020-09-23 2021-09-23 and Capacity International d'examen technique et amélioration le coût de la gestion de l’infrastructure commerciale des municipalités CG-DURQUAP-016 BIS 1- SC-SFQC / Audit des municipalités-Audits urbain, Sélection fondée Development of Institutions En cours organisationnel et financier IBRD / 85880 A priori sur la qualité et Open 1,400,000.00 0.00 2020-03-26 2020-06-19 2020-04-16 2020-05-30 2020-06-27 2020-07-27 2020-08-31 2020-10-05 2021-10-05 and Capacity d'exécution des municipalités de le coût Brazzaville et de Pointe- Noire. Page 8 CG-DURQUAP-102 BIS-SC- SFQC / Réalisation de trois (03) NIES relatives aux travaux de réhabilitation des écoles Malonga Ecoute et la Sélection fondée Integration and En cours Sorbonne à Moukoundzi IBRD / 85880 A posteriori sur la qualité et Open - National 275,000.00 0.00 2020-05-15 2020-04-25 2020-06-05 2020-05-20 2020-07-19 2020-08-16 2020-09-15 2020-10-20 2020-11-24 2021-11-24 Neighborhood Upgrading d'exécution Ngouaka ainsi que du centre le coût de sante intégré à Soukissa, et de construction du complexe sportif de Soukissa à Brazzaville. CG-DURQUAP-068-SC-QC / Supervision marché Tchiniambi-Recrutement d'un Sélection fondée consultant charge de la Integration and sur les IBRD / 85880 A posteriori Open - National 250,000.00 0.00 Annulé 2019-05-28 2019-06-04 2019-07-18 2019-08-17 2019-09-21 2020-03-19 supervision des travaux de Neighborhood Upgrading qualifications des reinstallation du marché consultants TCHINIAMBI a Pointe Noire CG-DURQUAP-099-SC-QC / CSI Soukissa/Recrutement d'un consultant pour les Sélection fondée études techniques, le Integration and sur les IBRD / 85880 A posteriori Open - National 300,000.00 0.00 Annulé 2020-02-10 2020-03-13 2020-03-02 2020-03-27 2020-04-15 2020-05-15 2020-06-19 2020-12-16 Contrôle et la supervision Neighborhood Upgrading qualifications des des travaux de réhabilitation consultants du CSI Soukissa Brazzaville. CG-DURQUAP-016BIS-SC- SFQ / Réorganisation fonctionnelle-Recrutement d'un consultant pour la réalisation de la réorganisation fonctionnelle Project Management, Sélection fondée Open - IBRD / 85880 A priori 1,470,000.00 0.00 Annulé 2018-12-09 2018-12-14 2019-01-27 2019-02-24 2019-03-26 2019-04-25 2019-05-30 2020-05-29 de l'assistance technique aux Coordination and Evaluation sur la qualité International municipalités et au renforcement des capacités en fonction de la demande des municipalités de BZV et de PNR CG-DURQUAP-121-SC-QC / HIMO-Renforcement des capacités des Entreprises Sélection fondée locales, ONG et Associations Development of Institutions sur les Open - En cours en techniques HIMO pour la IBRD / 85880 A posteriori 300,000.00 0.00 2020-07-28 2020-05-11 2020-08-18 2020-06-15 2020-10-01 2020-10-31 2020-12-05 2021-06-03 and Capacity qualifications des International d'exécution réhabilitation des consultants infrastructures des quartiers cibles à Brazzaville et à Pointe-Noire. CG-DURQUAP-065-SC-SFQC / Supervision erosion- Recrutement d'un consultant Sélection fondée chargé du contrôle et de Integration and Open - IBRD / 85880 A priori sur la qualité et 500,000.00 0.00 Annulé 2018-12-06 2018-12-13 2019-01-26 2019-02-23 2019-03-25 2019-04-29 2019-06-03 2020-06-02 la supervision travaux de Neighborhood Upgrading International le coût traitement de la zone en proie aux érosions à Brazzaville CG-DURQUAP-124-SC-SFQC / Recrutement d'un cabinet Sélection fondée d'audit financier des comptes Project Management, Open - En attente IBRD / 85880 A posteriori sur la qualité et 100,000.00 0.00 2020-08-20 2020-09-10 2020-10-24 2020-11-21 2020-12-21 2021-01-25 2021-03-01 2022-03-01 clos au 31 décembre 2020 et Coordination and Evaluation International d'exécution le coût des comptes de clôture du projet DURQuaP INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CG-010-SC-CI / Recrutement SPM-du personnel complémentaire de Integration and IBRD / 85880 A priori Individuel Open 150,000.00 48,022.31 Achevé 2017-10-02 2017-11-07 2017-11-20 2018-01-23 2017-12-11 2018-03-23 2018-01-15 2018-04-27 2018-07-14 2019-04-26 l'Unité de Coordination- Neighborhood Upgrading Spécialiste en passation des marchés CG-DURQUAP-012-BIS-SC- CI / CI-Comptable- Integration and En attente Recrutement du personnel IBRD / 85880 A priori Individuel Limited 65,000.00 0.00 2017-03-20 2017-05-19 2017-07-18 2017-09-25 2018-03-24 Neighborhood Upgrading d'exécution complémentaire de l'Unité de Coordination - Comptable CG-DURQUAP-011-BIS-SC- CI / CI-Sauvegarde- Recrutement du personnel Integration and En cours complémentaire de l'Unité de IBRD / 85880 A priori Individuel Limited 100,000.00 0.00 2017-03-20 2017-05-07 2017-07-06 2017-09-25 2018-03-24 Neighborhood Upgrading d'exécution Coordination - Spécialiste en sauvegardes environnementales et sociales Page 9 CG-012-SC-CI / Recrutement du personnel Integration and IBRD / 85880 A priori Individuel Open 65,000.00 0.00 Annulé 2017-06-30 2017-08-18 2017-09-08 2017-10-13 2018-04-11 complémentaire de l'Unité de Neighborhood Upgrading Coordination-Comptable CG-DURQUAP-018-BIS-SC- CI / Appui technique- Integration and IBRD / 85880 A posteriori Individuel Direct 65,000.00 61,932.50 Signé 2017-01-02 2018-02-07 2017-07-12 2017-08-03 2018-06-27 2017-09-07 2017-08-17 2018-03-06 Recrutement de l'Expert en Neighborhood Upgrading appui technique à la Cellule CG-DURQUAP-024-SC-CI / Assistante-Recrutement du Integration and personnel complémentaire de IBRD / 85880 A posteriori Individuel Open 47,900.00 12,770.93 Achevé 2017-03-14 2017-05-19 2017-07-18 2018-06-27 2017-09-25 2018-02-07 2018-01-03 2019-02-06 Neighborhood Upgrading l'Unité de Coordination - Assistante CG-DURQUAP-020-SC-CI / Communication-Recrutement du personnel complémentaire Integration and IBRD / 85880 A posteriori Individuel Open 171,500.00 45,762.49 Achevé 2017-03-14 2017-05-19 2017-07-18 2018-06-27 2017-09-25 2018-02-07 2018-01-03 2019-02-06 de l'Unité de Coordination - Neighborhood Upgrading Spécialiste en Communication CG-DURQUAP-022-SC-CI / Suivi-Eval-Recrutement du personnel complémentaire de Integration and IBRD / 85880 A posteriori Individuel Open 171,500.00 45,900.26 Achevé 2017-03-14 2017-05-19 2017-07-18 2018-06-27 2017-09-25 2018-02-07 2018-01-03 2019-02-06 l'Unité de Coordination - Neighborhood Upgrading Spécialiste en Suivi- Évaluation CG-DURQUAP-021-SC-CI / Développement local- Recrutement du personnel Integration and IBRD / 85880 A posteriori Individuel Open 143,600.00 38,428.13 Achevé 2017-03-14 2017-05-19 2017-07-18 2018-06-27 2017-09-25 2018-02-07 2018-01-03 2019-02-06 complémentaire de l'Unité de Neighborhood Upgrading Coordination - Spécialiste en en Développement local CG-DURQUAP-023-SC-CI / Mission Tech.-Recrutement Integration and du personnel complémentaire IBRD / 85880 A posteriori Individuel Open 143,600.00 38,312.78 Achevé 2017-03-14 2017-05-19 2017-07-18 2018-06-27 2017-09-25 2018-02-07 2018-01-03 2019-02-06 Neighborhood Upgrading de l'Unité de Coordination - Chargé de mission technique CG-DURQUAP-025-SC-CI / Development of Institutions Recrutement du IBRD / 85880 A posteriori Individuel Direct 200,000.00 0.00 Annulé 2018-02-04 2018-02-07 2018-02-14 2018-03-07 2018-04-11 2018-10-08 and Capacity Coordonnateur du Projet CG-DURQUAP-025-BIS-SC- Sélection de Integration and CI / Recrutement du IBRD / 85880 A priori consultants par Direct 220,000.00 54,383.10 Achevé 2018-03-21 2018-03-28 2018-03-31 2018-06-04 2018-05-09 2018-12-01 2019-05-08 Neighborhood Upgrading Coordonnateur du Projet entente directe CG-018-SC-CI / Integration and Recrutement de l'Expert en IBRD / 85880 A priori Individuel Direct 65,000.00 0.00 Annulé 2017-06-30 2017-07-10 2017-07-31 2017-09-04 2018-03-03 Neighborhood Upgrading appui technique à la Cellule CG-011-SC-CI / Recrutement du personnel Integration and complémentaire de l'Unité de IBRD / 85880 A priori Individuel Open 100,000.00 0.00 Annulé 2017-06-30 2017-08-18 2017-09-08 2017-10-13 2018-04-11 Neighborhood Upgrading Coordination-Spécialiste en sauvegarde CG-DURQUAP-031-SC-CI / Integration and IBRD / 85880 A posteriori Individuel Open 27,000.00 6,438.46 Signé 2018-03-30 2018-03-26 2018-05-11 2018-07-21 2018-06-01 2018-08-01 2018-07-06 2018-07-07 2019-01-02 Recrutement - Chauffeur 1 Neighborhood Upgrading CG-DURQUAP-032-SC-CI / Integration and IBRD / 85880 A posteriori Individuel Open 27,000.00 6,413.76 Signé 2018-04-06 2018-03-26 2018-05-18 2018-08-01 2018-06-08 2018-08-01 2018-07-13 2018-07-07 2019-01-09 Recrutement-Chauffeur 2 Neighborhood Upgrading CG-DURQUAP-033-SC-CI / Integration and IBRD / 85880 A posteriori Individuel Open 27,000.00 6,355.30 Signé 2018-04-06 2018-03-26 2018-05-18 2018-08-01 2018-06-08 2018-08-01 2018-07-13 2018-07-07 2019-01-09 Recrutement-Chauffeur 3 Neighborhood Upgrading CG-DURQUAP-026-SC-CI / Development of Institutions Recrutement d'un Assistant IBRD / 85880 A posteriori Individuel Direct 112,000.00 31,783.54 Signé 2018-03-29 2018-04-28 2018-04-07 2018-04-28 2018-05-11 2018-06-02 2018-05-14 2018-11-29 and Capacity en passation des marchés CG-019-SC-CI / Evaluation Integration and IBRD / 85880 A priori Individuel Open 200,000.00 87,949.63 Achevé 2018-06-08 2018-06-07 2018-07-20 2018-09-17 2018-08-10 2018-11-02 2018-09-14 2018-11-02 2019-03-13 2019-05-21 de base du projet Neighborhood Upgrading CG-DURQUAP-046 -SC-CI / Miantenancier informatique - Project Management, En attente Recrutement d'un IBRD / 85880 A posteriori Individuel Open 10,000.00 0.00 2018-08-15 2018-09-26 2018-10-17 2018-11-21 2019-05-20 Coordination and Evaluation d'exécution maintenancier du matériel informatique à temps partiel CG-DURQUAP-037-SC-CI / PAR SUKISSA-Recrutement d'un consultant individuel chargé de la préparation du Integration and IBRD / 85880 A posteriori Individuel Open 60,000.00 78,986.00 Achevé 2018-08-16 2018-08-24 2018-09-27 2018-10-23 2018-10-18 2018-12-14 2018-11-22 2018-11-21 2019-05-21 2019-05-27 plan d'action de Neighborhood Upgrading réinstallation (PAR) du marché SUKISSA à BRAZZAVILLE. Page 10 CG-DURQUAP-049-SC-CI / Stagiaire 2- Recrutement Integration and d'un stagiaire en IBRD / 85880 A posteriori Individuel Limited 2,000.00 780.73 Achevé 2018-06-10 2018-06-12 2018-07-03 2018-12-04 2018-08-07 2018-09-11 2019-02-03 2018-12-12 Neighborhood Upgrading Sauvegardes environnementales et sociales CG-DURQUAP-048 BIS-SC- CI / Stagiaire 1- Integration and Recrutement d'un stagiaire IBRD / 85880 A posteriori Individuel Limited 2,000.00 780.73 Achevé 2018-06-10 2018-06-12 2018-07-03 2018-12-04 2018-08-07 2018-09-11 2019-02-03 2018-12-12 Neighborhood Upgrading en Sauvegardes environnementales et sociales CG-DURQUAP-028-BIS 1- SC-CI / PAR Voiries- Recrutement d'un consultant individuel chargé de la réalisation du Plan d'Action Project Management, IBRD / 85880 A posteriori Individuel Limited 150,000.00 212,734.65 Achevé 2018-09-04 2018-12-14 2018-09-09 2018-12-04 2018-09-30 2018-12-15 2018-11-04 2018-11-27 2019-05-03 2019-10-02 des Réinstallation pour les Coordination and Evaluation travaux de construction des voiries par pavage à Brazzaville et à Pointe- Noire. CG-DURQUAP-048-SC-CI / Stagiaires-Recrutement des Project Management, IBRD / 85880 A posteriori Individuel Limited 5,000.00 0.00 Annulé 2018-07-23 2018-08-10 2018-07-28 2018-08-18 2018-09-22 2019-03-21 stagiaires environnementale Coordination and Evaluation et sociale CG-DURQUAP-028 BIS-SC- CI / PAR Voiries Brazza- Réalisation d'un plan Development of Institutions d'action de réinstallation IBRD / 85880 A posteriori Individuel Open 75,000.00 0.00 Annulé 2018-08-30 2018-08-24 2018-10-18 2018-11-08 2018-12-13 2019-06-11 and Capacity (PAR) des travaux de construction des voiries par pavage à Brazzaville CG-DURQUAP-036-SC-CI / PAR voiries PN-Réalisation d'un plan d'action de Development of Institutions réinstallation (PAR) des IBRD / 85880 A posteriori Individuel Open 75,000.00 0.00 Annulé 2018-08-30 2018-08-24 2018-10-18 2018-11-08 2018-12-13 2019-06-11 and Capacity travaux de construction des voiries par pavage à Brazzaville CG-DURQUAP-055-SC-CI / PAR Eau et Electricité - Recrutement d'un consultant pour la realisation des plans Project Management, En cours d'action de réinstallation IBRD / 85880 A posteriori Individuel Open 180,000.00 0.00 2018-12-05 2019-12-26 2019-01-23 2020-06-11 2019-02-13 2019-03-20 2019-09-16 Coordination and Evaluation d'exécution (PAR) des reseaux eau et electricite à Brazzaville et à Pointe Noire dans les quartiers cibles du projet. CG-DURQUAP-063-SC-CI / Chauffeur de liaison- Integration and Recrutement d'un chauffeur IBRD / 85880 A posteriori Individuel Open 6,000.00 0.00 Annulé 2018-12-07 2018-12-18 2019-01-18 2019-02-08 2019-03-15 2019-09-11 Neighborhood Upgrading de liaison du projet DURQuaP. CG-DURQUAP-038-SC-ED / TOM2PRO-Recrutement d'un consultant pour la mise à jour du logiciel TOM2PRO , Sélection de la recodification du plan Integration and En attente IBRD / 85880 A posteriori consultants par Direct 20,000.00 0.00 2019-01-08 2019-01-18 2019-03-24 2019-09-20 comptable, le reparamétrage Neighborhood Upgrading d'exécution entente directe des états financiers et le renforcement des capacités de l'équipe financière du projet. CG-DURQUAP-077-SC-ED / Developpement Local- Integration and Renouvellement du contrat IBRD / 85880 A posteriori Individuel Direct 37,000.00 37,107.72 Signé 2019-01-10 2019-02-09 2019-01-20 2019-02-15 2019-02-10 2019-02-19 2019-03-17 2019-02-07 2019-09-13 Neighborhood Upgrading du Spécialiste en Développement local CG-DURQUAP-069-SC-ED / Coordo-Renouvellement du Integration and IBRD / 85880 A posteriori Individuel Direct 50,000.00 50,109.30 Signé 2019-01-10 2019-07-20 2019-01-20 2019-10-04 2019-02-10 2019-10-04 2019-03-17 2019-05-09 2019-09-13 contrat du Coordonnateur du Neighborhood Upgrading Projet CG-DURQUAP-070-SC-ED / Integration and Chauffeur 1-Renouvellement IBRD / 85880 A posteriori Individuel Direct 6,000.00 6,070.72 Signé 2019-05-10 2019-06-25 2019-05-20 2019-11-19 2019-06-10 2019-11-19 2019-07-15 2019-07-09 2020-01-11 Neighborhood Upgrading du contrat du Chauffeur 1 CG-DURQUAP-071-SC-ED / Integration and Chauffeur 2-Renouvellement IBRD / 85880 A posteriori Individuel Direct 6,000.00 6,092.96 Signé 2019-05-10 2019-07-20 2019-05-20 2019-08-19 2019-06-10 2019-08-22 2019-07-15 2019-07-09 2020-01-11 Neighborhood Upgrading du contrat du Chauffeur 2 CG-DURQUAP-072-SC-ED / Integration and Chauffeur 3-Renouvellement IBRD / 85880 A posteriori Individuel Direct 6,000.00 6,079.25 Signé 2019-05-10 2019-07-20 2019-05-20 2019-08-05 2019-06-10 2019-08-19 2019-07-15 2019-07-10 2020-01-11 Neighborhood Upgrading du contrat du Chauffeur 3 Page 11 CG-DURQUAP-073-SC-ED / APM-Renouvellement du Integration and IBRD / 85880 A posteriori Individuel Direct 32,000.00 28,782.10 Signé 2019-03-15 2019-03-25 2019-04-15 2019-07-14 2019-05-20 2019-05-14 2019-11-16 contrat de l' Assistant en Neighborhood Upgrading passation des marchés CG-DURQUAP-074-SC-ED / Integration and Assistante-Renouvellement du IBRD / 85880 A posteriori Individuel Direct 12,000.00 16,391.33 Signé 2018-12-10 2019-02-01 2018-12-20 2019-02-19 2019-01-10 2019-02-19 2019-02-14 2019-02-07 2019-08-13 Neighborhood Upgrading contrat de l' Assistante CG-DURQUAP-075-SC-ED / CMTI-Renouvellement du Integration and IBRD / 85880 A posteriori Individuel Direct 37,000.00 37,186.78 Signé 2019-01-10 2019-02-01 2019-01-20 2019-02-19 2019-02-10 2019-02-19 2019-03-17 2019-02-07 2019-09-13 contrat du Chargé de Neighborhood Upgrading mission technique CG-DURQUAP-076-SC-ED / Suivi Eval-Renouvellement Integration and IBRD / 85880 A posteriori Individuel Direct 43,000.00 44,279.77 Signé 2019-01-10 2019-02-01 2019-01-20 2019-02-19 2019-02-10 2019-03-21 2019-03-17 2019-02-07 2019-09-13 du contrat du Spécialiste en Neighborhood Upgrading Suivi-Evaluation CG-DURQUAP-078-SC-ED / Communication- Integration and Renouvellement du contrat IBRD / 85880 A posteriori Individuel Direct 43,000.00 44,793.19 Signé 2019-01-10 2019-02-01 2019-01-20 2019-02-19 2019-02-10 2019-02-19 2019-03-17 2019-02-07 2019-09-13 Neighborhood Upgrading du Spécialiste en Communication CG-DURQUAP-079-SC-ED / Integration and Comptable-Renouvellement IBRD / 85880 A posteriori Individuel Direct 28,000.00 28,330.01 Signé 2019-01-10 2019-08-19 2019-01-20 2019-11-19 2019-02-10 2019-11-19 2019-03-17 2019-04-08 2019-09-13 Neighborhood Upgrading du contrat du Comptable CG-DURQUAP-080-SC-ED / Sauvegardes-Renouvellement Integration and du contrat du Spécialiste en IBRD / 85880 A posteriori Individuel Direct 37,000.00 37,071.43 Signé 2019-01-10 2019-02-09 2019-01-20 2019-02-19 2019-02-10 2019-02-19 2019-03-17 2019-02-07 2019-09-13 Neighborhood Upgrading sauvegardes environnementales et sociales CG-DURQUAP-081-SC-ED / SPM-Renouvellement du Integration and En cours contrat du Spécialiste en IBRD / 85880 A posteriori Individuel Direct 43,000.00 0.00 2019-03-11 2019-08-19 2019-03-21 2019-11-25 2019-04-11 2019-05-16 2019-11-12 Neighborhood Upgrading d'exécution passation de marchés du projet CG-DURQUAP-082-SC-CI / Traitement de données- Recrutement d'un consultant Project Management, pour le traitement des IBRD / 85880 A posteriori Individuel Open 3,000.00 1,707.56 Signé 2019-01-21 2018-09-12 2019-03-11 2019-01-22 2019-04-01 2019-01-26 2019-05-06 2019-02-12 2019-11-02 Coordination and Evaluation données d'enquête relatif à l'état des lieux à Pointe Noire sur SPHYNX CG-DURQUAP-063BIS-SC- Integration and CI / Recrutement chauffeur IBRD / 85880 A posteriori Individuel Limited 6,000.00 6,117.12 Signé 2019-01-10 2018-12-26 2019-01-15 2018-12-29 2019-02-05 2019-05-31 2019-03-12 2019-04-18 2019-09-08 Neighborhood Upgrading de liaison CG-DURQUAP-087-SC-CI / RAFC-Recrutement du Project Management, Responsable Administratif, IBRD / 85880 A posteriori Individuel Open 144,000.00 44,173.47 Signé 2019-01-10 2018-12-31 2019-02-28 2019-04-01 2019-03-21 2019-04-01 2019-04-25 2019-03-29 2019-10-22 Coordination and Evaluation Financier et Comptable (RAFC) du Projet CG-DURQUAP-095-CI-ED / Renouvellement de stage de monsieur NGAMOUYI Project Management, Austève Xavier stagiaire en IBRD / 85880 A posteriori Individuel Direct 748.00 770.95 Signé 2015-12-15 2019-06-29 2015-12-25 2019-06-29 2016-01-15 2019-06-29 2016-02-19 2018-12-13 2016-08-17 Coordination and Evaluation sauvegardes environnementale et sociale au projet DURQuaP CG-DURQUAP-096-CI-ED / Renouvellement de stage de Madame MANTOTA Project Management, Brigitte Alima stagiaire en IBRD / 85880 A posteriori Individuel Direct 748.00 758.84 Signé 2015-01-10 2019-11-04 2015-01-20 2019-11-19 2015-02-10 2019-11-19 2015-03-17 2018-12-13 2015-09-13 Coordination and Evaluation sauvegardes environnementale et sociale au projet DURQuaP CG-DURQUAP-100-SC-CI / Site Web-Recrutement d'un consultant chargé de la Project Management, IBRD / 85880 A posteriori Individuel Open 15,000.00 12,539.85 Signé 2019-11-15 2019-12-23 2020-01-03 2020-05-19 2020-01-24 2020-05-19 2020-02-28 2020-05-26 2020-08-26 création et de la mise à Coordination and Evaluation jour d'un site web du projet DURQuaP CG-DURQUAP-99-CI-ED / PAR groupés- Contractualisation par entente directe avec IBRAHIMA FALL pour la réalisation des PAR pour les Integration and IBRD / 85880 A posteriori Individuel Direct 190,000.00 225,793.19 Signé 2020-01-17 2020-01-06 2020-01-27 2020-02-06 2020-02-17 2020-05-17 2020-03-23 2020-03-28 2020-09-19 travaux de construction des Neighborhood Upgrading marchés de Tchiniambi1 et de Moukoundzi Ngouaka ainsi que des ouvrages anti- érosifs de Nzoko MBIMI et MASSINA Page 12 CG-DURQUAP-98-SC-ED / Etudes voiries 2- Contractualisation par entente directe avec le bureau d'études GAUFF Sélection de Ingénieur pour la réalisation Integration and IBRD / 85880 A posteriori consultants par Direct 350,000.00 169,265.25 Signé 2020-01-20 2020-01-06 2020-01-30 2020-05-18 2020-04-04 2020-03-28 2020-10-01 des APD et DAO des Neighborhood Upgrading entente directe travaux de construction des voiries urbaines dans les quartiers cibles de Brazzaville et de Pointe- Noire (Phase 2) CG-DURQUAP-065 BIS-SC- ED / Supervision Tx Erosion/Contractualisation par Entente Directe avec le Sélection de Integration and En cours bureau d'études INROS IBRD / 85880 A posteriori consultants par Direct 300,000.00 0.00 2020-02-20 2020-03-23 2020-03-01 2020-05-05 2020-11-01 Neighborhood Upgrading d'exécution LACKNER pour le contrôle entente directe et la supervision des travaux des zones en proie aux érosions. CG-017-SC-CI / Recrutement Consultants Development of Institutions pour le renforcement IBRD / 85880 A priori Individuel Open 500,000.00 0.00 Annulé 2018-12-20 2019-01-31 2019-02-21 2019-03-28 2019-09-24 and Capacity capacités personnel des Mairies. CG-DURQUAP-029BIS-SC- CI / TDR patrimoine- Recrutement un consultant pour l'élaboration des termes de référence relatif à la gestion du patrimoine Project Management, IBRD / 85880 A posteriori Individuel Open 5,000.00 0.00 Annulé 2018-12-06 2019-01-18 2019-02-08 2019-03-15 2019-09-11 municipal et de l'assistance Coordination and Evaluation technique en gestion de l'infrastructure commerciale de la municipalité de Brazzaville et de Pointe Noire CG-DURQUAP-089-SC-CI / TDR législation-Recrutement d'un consultant pour l'élaboration des termes de Project Management, référence relatif à IBRD / 85880 A posteriori Individuel Open 5,000.00 0.00 Annulé 2019-01-29 2019-03-13 2019-04-03 2019-05-08 2019-11-04 Coordination and Evaluation l'application de la législation et de la réglementation actualisées en matière d'urbanisme et d'habitat CG-DURQUAP-053BIS-SC- ED / NIES Marché Tchiniambi- ED/Contractuilisation par Sélection de entente directe avec CAERD Integration and IBRD / 85880 A posteriori consultants par Direct 75,000.00 105,158.73 Signé 2020-02-25 2020-04-18 2020-03-01 2020-04-27 2020-05-05 2020-03-26 2020-11-01 pour la mission de la Notice Neighborhood Upgrading entente directe d'Impact Environnementale et Sociale (NIES) du marché domanial Tchiniambi 1 à Pointe Noire CG-DURQUAP-107-SC-ED / NIES marché Moukoundzi- ED-CAERD/Contractualisation par entente directe avec Sélection de CAERD pour la mission de Integration and En cours IBRD / 85880 A posteriori consultants par Direct 75,000.00 0.00 2020-02-25 2020-05-05 2020-03-06 2020-05-10 2020-11-06 la Notice d'Impact Neighborhood Upgrading d'exécution entente directe Environnementale et Sociale (NIES) du marché domanial Moukoundzi Ngouaka à Brazzaville CG-DURQUAP-059 BIS-SC- ED / NIES écoles et stade- ED-SERF/Contractualisation par entente avec SERF BURKINA pour la mission Sélection de Integration and de la Notice d'Impact IBRD / 85880 A posteriori consultants par Direct 250,000.00 419,772.06 Signé 2020-02-25 2020-03-05 2020-03-06 2020-04-18 2020-05-10 2020-03-23 2020-11-06 Neighborhood Upgrading Environnementale et Sociale entente directe (NIES) écoles Mountou Mavoungou et Pambou Binjamen, du stade TATA LOBOKO CG-DURQUAP-109-SC-CI / Recrutement d'un spécialiste Project Management, IBRD / 85880 A posteriori Individuel Limited 45,000.00 35,594.64 Signé 2020-03-05 2020-04-07 2020-03-10 2020-04-27 2020-03-31 2020-05-18 2020-05-05 2020-05-18 2020-11-01 de sauvegarde sociale du Coordination and Evaluation projet DURQuaP CG-DURQUAP-114-SC-CI / Opérateurs/Recrutement de Project Management, En cours IBRD / 85880 A posteriori Individuel Limited 30,000.00 0.00 2020-02-29 2020-05-24 2020-03-05 2020-03-26 2020-04-30 2020-10-27 six (06) opérateurs du centre Coordination and Evaluation d'examen d'appels du DURQuaP CG-DURQUAP-115-SC-CI / Superviseurs/Recrutement de Project Management, En cours IBRD / 85880 A posteriori Individuel Limited 12,000.00 0.00 2020-02-29 2020-05-24 2020-03-05 2020-03-26 2020-04-30 2020-10-27 deux (02) superviseurs du Coordination and Evaluation d'exécution centre d'appel du DURQuaP Page 13 CG-DURQUAP-116-SC-ED / NIES écoles-ED- SERF/Contractualisation par entente directe avec SERF BURKINA pour la mission Sélection de Integration and En attente des Notices d'Impact IBRD / 85880 A posteriori consultants par Direct 125,000.00 0.00 2020-03-10 2020-03-20 2020-05-24 2020-11-20 Neighborhood Upgrading d'exécution Environnementale et Sociale entente directe (NIES) écoles Malonga écoute et la Sorbonne de Moukoundzi Ngouaka à Brazzaville. CG-DURQUAP-117-SC-ED / NIES CSI C.sportif-ED SERF/Contractualisation par entente directe avec SERF Sélection de BURKINA pour la mission Integration and IBRD / 85880 A posteriori consultants par Direct 125,000.00 0.00 Annulé 2020-02-29 2020-03-10 2020-05-14 2020-11-10 des Notices d'Impact Neighborhood Upgrading entente directe Environnementale et Sociale (NIES) centre de santé intégré et complexe sportif de Soukissa à Brazzaville CG-DURQUAP-105-SC- ED/GERAD / MOS-BZV-ED- Sélection de GERAD/Renouvellement du Development of Institutions En cours IBRD / 85880 A priori consultants par Direct 787,006.00 0.00 2020-04-30 2020-05-21 2020-05-10 2020-07-14 2021-01-10 contrat de la maîtrise and Capacity d'exécution entente directe d'œuvre sociale à Brazzaville. CG-DURQUAP-106-SC- ED/GERAD / MOS-PNR-ED- Sélection de GERAD/Renouvellement du Development of Institutions En cours IBRD / 85880 A priori consultants par Direct 760,368.00 0.00 2020-04-30 2020-05-19 2020-05-10 2020-06-15 2020-07-14 2021-01-10 contrat de la maîtrise and Capacity d'exécution entente directe d'œuvre sociale à Pointe- Noire par entente directe CG-DURQUAP-120-SC-CI / Revue à mi- parcours/Recrutement d'un Project Management, En cours consultant pour appuyer IBRD / 85880 A posteriori Individuel Limited 20,000.00 0.00 2020-04-30 2020-05-10 2020-05-05 2020-05-26 2020-06-30 2020-12-27 Coordination and Evaluation d'exécution l'UCP/DURQuaP à la réalisation de la revue à mi- parcours du projet CG-DURQUAP-050-SC-CI / PAR TCHINIAMBI- Recrutement d'un consultant individuel chargé de la Integration and IBRD / 85880 A posteriori Individuel Open 90,000.00 0.00 Annulé 2018-12-15 2019-02-02 2019-02-23 2019-03-30 2019-09-26 préparation du Plan d'Action Neighborhood Upgrading de Réinstallation (PAR) du marché de TCHINIAMBI à Pointe-Noire. CG-DURQUAP-047-SC-CI / Maintenancier Reprographie Recrutement d' un Project Management, IBRD / 85880 A posteriori Individuel Open 10,000.00 0.00 Annulé 2018-08-23 2018-10-04 2018-11-15 2018-12-20 2019-06-18 maintenancier du matériel Coordination and Evaluation de reprographie du projet DURQuaP à temps partiel CG-DURQUAP-115-CS-INDV Project Management, En cours / Recrutement d'un ingénieur IBRD / 85880 A posteriori Individuel Open 30,000.00 0.00 2020-06-25 2020-05-20 2020-07-21 2020-08-04 2020-08-18 2021-06-22 Coordination and Evaluation d'exécution junior en génie civil CG-DURQUAP-047BIS-SC- CI / Recrutement d'un Assistant technique Project Management, En cours IBRD / 85880 A priori Individuel Limited 240,000.00 0.00 2020-05-29 2020-06-05 2020-06-03 2020-06-11 2020-06-24 2020-07-29 2021-01-25 international en passation Coordination and Evaluation d'exécution des marchés du projet DURQuaP. CG-DURQUAP-125-SC-CI / Recrutement d'un consultant Project Management, En attente IBRD / 85880 A posteriori Individuel Open 40,000.00 0.00 2020-08-25 2020-10-13 2020-11-03 2020-12-08 2021-06-06 individuel pour l'évaluation Coordination and Evaluation d'exécution finale du projet DURQuaP Page 14