International Bank for Reconstruction and Development International Development Association SecM89 -1044 FROM: Vice President and Secretary August 1, 1989 MONTHLY OPERATIONAL SUMMARY OF BANK AND IDA PROPOSED PROJECTS (As of July 15, 1989) Distribution: Executive Directors and Alternates President Senior Vice Presidents Senior Management Council Vice Presidents, IFC Directors and Department Heads, Bank and IFC I 1 1 1 1 | TABLE OF CONTENTS SECTION REGION PAGES I. AFRICA REGION 1- 43 Benin .................................... Botswana........ 1 Burkina Faso. 2 Burundin...... 3 Cameroonr...... . Cape Verde............ .................. 5 Central African Republic................. 5 Ch ad ..................................... 6 Comoros .................................. 7 Congo, People's Republic of the.......... 7 Cote d' Ivoire............................ 9 Djibouti................................. 11 Equatorial Guinea........................ 11 Ethiopia................................. 12 Gabon .................................... 13 The Gambia............................... 13 Ghana .................................... 14 Guinea ................................... 15 Guinea Bissau............................ 16 Kenya .................................... 17 Lesotho .................................. 18 Madagascar ............................... 19 Malawi................................... 21 M ali ..................................... 22 Mauritania............................... 23 Mauritius................................ 25 Mozambique............................... 25 Niger .................................... 26 Nigeria .................................. 27 Rwandad......... 30 Sao Tome and Principe.................... 31 Senegal.................................. 32 Sierra Leone............................. 34 Somalia .................................. 34 Sudan .................................... 35 Tanzania................................. 36 Togo ..................................... 37 Uganda ................................... 38 Zaire .................................... 39 Zambia ................................... 41 Zimbabwe................................. 42 West Africa Region....................... 43 - ii - SECTION REGION PAGES II. ASIA REGION 44 - 81 Bangladesh............................... 44 China.................................... 49 Fiji..................................... 56 India.................................... 57 Indonesia................................ 62 Koreaa.............. 68 Lao People's Democratic Republic......... 69 Malaysia................................. 69 Maldives ................................. 71 Union of Myanmar......................... 72 Nepall....... 72 Papua New Guinea......................... 75 Philippines.............................. 75 Solomon Islands.......................... 78 Sri Lanka................................ 78 Thailand................................. 80 Tonga.................................... 80 Vanuatu .................................. 81 Western Samoa............................ 81 III EUROPE, MIDDLE EAST AND NORTH AFRICA 82 - 102 Algeria................................... 82 Cyprus .................................... 83 Egypt, Arab Republic of................... 84 Hungary................................... 86 Jordan .................................... 87 Morocco............................. 8..... 88 Pakistan.................................. 90 Poland.................................... 94 Portugal.................................. 94 Tunisia................................... 95 Turkey .................................... 96 Yemen Arab Republic....................... 98 Yemen, People's Democratic Republic of.... 100 Yugoslavia................................ 101 IV. LATIN AMERICA AND CARIBBEAN 103 - 124 Argentina.................................. 103 Barbados................................... 104 Bolivia.................................... 104 - iii - SECTION REGION PAGES IV. LATIN AMERICA AND CARIBBEAN 103 - 124 Brazil..................................... 106 Caribbean Region........................... 110 Central America Region..................... 110 Chile...................................... 110 Colombia................................... 11 Costa Rica................................. 112 Dominican Republic......................... 113 Ecuador.................................... 113 El Salvador................................ 115 Guatemala .................................. 115 Guyana..................................... 115 Haiti...................................... 116 Honduras................................... 117 Jamaica .................................... 117 Mexico..................................... 119 Paraguay................................... 121 St. Kitts.................................. 121 St. Lucia.................................. 121 Trinidad & Tobago.......................... 121 Uruguay.................................... 122 Venezuela.................................. 123 V. NEW PROJECTS 125 - 129 I. AFRICA REGION . 125 - 126 Botswana................................. 125 Cameroon................................. 125 Central African Republic................. 125 Cote d'Ivoire............................ 125 Kenya.................................... 125 Mala i................................... 126 Zaire .................................... 126 Zaire.................................... 122 - iv - II ASIA REGION 126 - 127 Bangladesh............................... 126 China.................................... 126 Indonesia................................ 127 Thailand................................. 127 III EUROPE, MIDDLE EAST AND NORTH AFRICA 127 Morocco.................................. 127 Turkey ................................... 127 Yugoslavia............................... 127 IV LATIN AMERICA AND CARIBBEAN 128 - 129 Brazil ................................... 128 Chile.................................... 128 Trinidad & Tobago........................ 128 Uruguay.................................. 128 Venezuela................................ 129 VI. PROJECTS DROPPED FROM LENDING PROGRAM 130 - 133 AND PROJECTS SIGNED I AFRICA REGION 130 - 131 Benin .................................... 130 Cameroon................................. 130 Chad ..................................... 130 Gabon .................................... 130 The Gambia............................... 130 Guinea-Bissau............................ 130 Kenya.................................... 131 Mali. . . .....*131......... 131 Mauritania............................... 131 Niger.................................... 131 Sao Tome & Principe...................... 131 Somalia.................................. 131 Togo ..................................... 131 Zaire .................................... 131 II ASIA REGION 132 Bangladesh............................... 132 China.......................... .......... 132 Lao People's Democratic Republic......... 132 Malaysia................................. 132 III EUROPE, MIDDLE EAST AND NORTH AFRICA 132 - 133 Tunisia................................. 132 Turkey .................................. 133 IV LATIN AMERICA AND CARIBBEAN 133 Brazil................................... 133 Uruguay.................................. 133 Secretary's Department г ` I 1� 1 1 Member Country, Amount Project3 Consulting Services Stage of Processing and Action on Procurement4 and I lementing Probable M i Agenc Lender2 I. AFRICA REGION BENIN Ministry of Plan 5.0 Pre-Investment - Surveys, reviews Consultants will be Preparation under way. (IDA) and analyses to Identify high- needed for project priority investment project; preparation and training and studies for financing implementation. agencies. To be determined 5.0 Agricultural Services/Livestock To be determined. Project preparation under (IDA) Improve the capability of way. agricultural service agencies In planning, policy formulation and provision of services with emphasis on privatization of some of the services. Ministry of 18.6 (R) Health - Assist Government in Consultants will be Approved by the.Executive Public Health (IDA) sectoral reforms aimed at'improvLng required for procurement# Directors on June 6, 1989. allocation of resources and hospital management Credit signed on June 26, strengthening health system systems and financial 1989. management. The project will management-, maternal & provide quick disbursing funds to child health/family Additional IDA PPF funds carry out sectoral reforms, and planning; information, for $375,000 have been investment financing, to strengthen education and approved. key health programs, and communication for health. (Co-financing secured from rehabilitate and revitalize rural Swiss Development health facilities with the aLm of Cooperation ($11.3 providing basic health and related million). services on a sustainable basis to the majority of the population. To be determined 8.5 Private Sector Development - The To be determined. Project preparation under (IDA) objective will be to initiate policy way. (Cofinancing to be changes and provide term financing identified). required to foster growth in the private sector. Total project cost is estimated at $20.0 million. BOTSWANA Ministry of About (N) Tull Block Roads - Construction To be determined. Project under preparation Works, Transport 17.0 of Sefophe-Martin's Drift Road (Cofinancing will be and (Bank) (135km) and Bobonong-Lekkerpoet Road required, including for Communications (66km) to support economic road maintenance diversification of Tull Block region management and and mining community of Selebi- organization). Phikve; strengthening of Government's road planning, maintenance management and organization. I/ Addresses of the ImplemontLng Agencies of now projects are given in Section V of the SLmnacy. It The amount is in millions of US dollars and is appro imate and tentative. SAP is the acronym fee the Special Facility foe Sub-Saharan Africa. It The Letter (0) before the projects swans that the project to a now LtstLnS in the sumaryl the Letter (R) means the information about the project has been revised since the last issue. 9 This coLumn contains available information. it any about action with respect to the procurement of goods and services expected to be financed by the lank or IDA. including retroactive ftnancingi eapenditures under the ISK01114A Project. -2- Member Country, Amount & Project3 Consulting Services Stage of Processing an< and Imylementing Probable Action on Procurement4 Agency Lender2 BURKINA FASO Ministry of 30.0 (R) Public Enterprise - Objective to Consultants will not be Project under preparatioi Economic (IDA) be determined based on findings of required. Promotion sector mission tentatively scheduled for end July. Ministere de 20.0 (R) Agriculture Services II - Consultants will be Project under preparatioi l'Agriculture et (IDA) Continued Improvement of research required (estimated at de l'Elevage et and extension services, possibly 100 staffweeks). Ministere de with addition of credit. Total l'Action project cost estimated at $30.0 Cooperative million. Paysanne Ministere de 20.0 (R) Agriculture SECAL - Policy Consultants will be Project under preparatior l'Agriculture et (IDA) reforms in the cotton and cereals required (estimated at (Possibility of de 1'Elevage subsector, including pricing, 100 staffweeks). cofinancing with CCCE, restructuring of stabilization France). mechanisms, marketing regulations and boards. Possibly some investments and substitutional reforms to Improve public sector efficiency. Total project cost estimated at $30.0 million. Ministere de 15.0 Transport SECAL - Project will Consultants preparing Project under preparation 1'Equipment/Mini- (IDA) include a rail and aviation feasibility studies. An IDA advance under the stere des component as well as road Project Preparation Transports maintenance and rehabilitation. Facility of $750,000 was Total cost estimated at $80.0 approved for feasibility million. studies. Ministere des 21.0 (R) Urban - Infrastructure re- Consultants provided by Negotiations scheduled fo: Finance (IDA) habilitation and financial and human Consortium BCEOM/Groupe July 17. resource mobilization for Huit have completed first Ouagadougou and Bobo Dioulasso to phase of feasibility IDA Project Preparation improve (a) tax collection; (b) study. Second phase Facility (PPF) advance of urban municipal management and began in April and was $500,000 approved to resource allocation, including civil completed in July 1988. finance preparation acti- works and detailed engineering. vities for Urban II and a Total project cost estimated at housing study. $44.9 million. Ministere de 25.0 Education IV - In support of the Consultants will be Appraisal mission l'Education (IDA) Government's sector strategy, the required. tentatively scheduled for project would: (a) introduce November.* measures to (i) increase budgetary allocations to primary education; (ii) increase efficiency in use of sector resources; and (iii) increase private sector and community participation in educational financing; (b) expand access to and improve the quality of primary education, (c) improve the quality of secondary education through improving curriculum design and provision of equipment and materials; and (d) improve operational procedures, staff quality and equipment for management. -3- Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency Lender2 BURKINA FASO (Cont'd) Ministere du Plan 15.0 (R) Environment Management - Project Consultants will be Project under preparation. (IDA) will constitute first part of long- required (estimated at (Possibility of term program to improve village land 200 staffweeks). cofinancing with NORAD and agricultural resource management (Norway); CCCE (France); throughout the country. The and GTZ (Federal Republic establishment and description of of Germany)). village boundaries, the development of village land use plan and implementation of the plans will form the basis of the project. Technical support and institutional reform will be included. Total cost estimated at $25.0 million. Ministere de la 20.0 Population/Health - Strengthening Consultants will be Preparation mission Sante (IDA) health sector management, extension required. scheduled for March 1990. of population/family planning/nutrition activities begun under first project. BURUNDI - Ministry of About (R) Transport Sector - Project would Consultants will be Appraisal report under Public Work and 19.4 provide assistance in 2 areas: required. preparation. Energy (IDA) (i) external transport: improve Negotiations tentatively reliability and transport scheduled for end- conditions, and lower transport September. costs for all imports and exports, especially coffee; (Li) internal transport: ensure adequate road maintenance and rehabilitation. Components could include assistance to transport planning, road maintenance and rehabilitation including selected investment. Ministry of Plan; About SAL III/APEX 2 - Continued support Consultants will be Project in early stage of Ministry of 60.6 to Government's adjustment program required. preparation. Finance (IDA) and consolidation of policy reforms undertaken under SAL I and II. Ministry of 33.1 (R) Agricultural Services - To Consultants will be Approved by the Executive Agriculture (IDA) strengthen planning in Ministry of required. Directors on May 25, 1989, Agriculture; restructuring of regional agriculture services; agricultural input distribution through private sector; and training. Ministry of About (R) Coffee - To increase foreign Consultants will be Appraisal mission Agriculture and 31.6 exchange earnings through required. scheduled for October. Livestock (IDA) improvements in coffee quality and Development marketing. Ministry of About Health/Population II - Sectoral Consultants may be Project under preparation Health 20.5 development and continuing support required. (IDA) to ongoing priority programs. Member Country, Amount & Project3 Consulting Services Stage of Processing and and I lementing Probable Action on Procurement4 Agency Lender2 CAMEROON Ministry of 30.0 (N) Social Dimensions of Adjustment Consultants have been Appraisal mission in the Planning (Bank) - a Socio-economic Development appointed. field. Negotiations Project containing 3 components: scheduled for November 13 (a) Social Policy Framework component in the contract of the Government's Standard Adjustment Program; (b) Social Action Program component covering vulnerable groups and community development (c) institutional support of Social Policy programming and monitoring of evaluation of living conditions of households. Ministry of 30.0 Export Promotion and Diversification Consultants will be Terms of reference for Agriculture, (Bank) - To support policy adjustment, required. project preparation are Commerce Plan investments and institutions for under discussion with export promotion of existing exports Government. and non-traditional exports. Ministry of 30.0 Forestry and Environment - To Consultants will not be Project under preparation. Agriculture (Bank) support sectoral policies and required. investments for forest exploitations, forest conservation and environmental protection. Ministry of 60.0 Food Security - To support Consultants have been Project under preparation. Agriculture, (Bank) investments, policy and income selected. Commerce & Plan generating micro projects to improve food security position in Cameroon. Ministere de 20.0 National Agricultural Extension and Consultants will not be Project under preparation. l'Agriculture (Bank) Training - To strengthen the required. Pilot extension operation institutional capability of under way. (Possibility extension services, upgrade the of cofinancing from quality and performance of local Belgium and the manpower resources and increase the Netherlands). linkages with, and efficiency of, extension supporting facilities. Ministere de 10.0 Third Urban - To improve urban Consultants will be Preparation studies to be l'Urbanisme et de (Bank) services, financing mechanisms and required. carried out under Urban II l'Habitat land resource management, to Project. Identification rehabilitate parastatal housing mission scheduled for agencies. FY90. Ministere des 100.0 (R) Rural Infrastructure (formerly Consultants will be Project preparation under Travaux Publics (Bank) Second Feeder Roads) - Three-year required for project way. et des Transports program for upgrading and execution. (Cofinancing being maintenance of feeder roads through sought). institutional strengthening, civil works and sector developments. Ministry of Plan, 150.0 (R) SAL I - To support government's Consultants not required. Approved by the Executive (Bank) economic recovery program and deepen Directors on June 14, and expand macroeconomic adjustment 1989. Loan signed on July process. 17, 1989. Retroactive financing of US$15.0 million approved for qualified imports after March 31, 1989. -5- Member Country, Amount & Project3 Consulting Services Stage of Processing and and Imlementing Probable Action on Procurement Agency Lender2 CAMEROON (Cont'd) Ministry of Plan 9.0 (R) Economic Management - Flexible Consultants will be Approved by the Executive and Technical (Bank) support mechanism providing high- required. Directors on July 11, Ministries level expertise to maintain momentum 1989. Loan signed on July of adjustment program in short-term. 17, 1989. Long-term goals are to strengthen key institutions implementing government policy; establish and implement improved investment planning systems; promote private enterprise through a more dynamic business environment. CAPE VERDE Ministry of 13.0 Population, Health and Women's Consultant services will Project preparation under Health (IDA) Development - Main objectives would be required. way. be: to increase access to and improve the quality of basic health; and help the Government develop policies to curb its population growth. Major components would include: (a) health manpower development; (b) strengthening basic health sources; (c) institutional development; and (d) support to Family Planning activities. CENTRAL AFRICAN REPUBLIC Ministry of 10.0 (N) Health I - Comprehensive health Consultants will be Project under preparation. Public Health and (IDA) sector reform program including required. Social Affairs components to strengthen sector organization and management, improve resource allocation and mobilization and strengthen financial and human resource management and training. The project may include rehabilitation and re-equipping of rural health facilities. Ministry of 20.0 Structural Adjustment III/Social Consultants will be Project under preparation Economy, Finance, (IDA) Dimensions of Adjustment - To required for a social Plan and continue to support the Government dimension adjustment International in the implementation of its component. Cooperation adjustment and explore new approaches to improve social conditions and reduce unemployment and poverty. Ministry of Rural 15.0 Export Crop Development - To FAO/CP will prepare Project being identified. Development (IDA) establish medium size coffee detailed feasibility plantations, and to promote study. diversification of export crops. -6- Member Country, Amount & Project Consulting Services Stage of Processing and and Ifflementing Probable Action on Procurement4 Agency Lender2 CENTRAL AFRICAN REPUBLIC (Cont'd) Ministries of 9.7 (R) Transport Sector - Project would Consultants recruited for Appraisal scheduled for Transport, and (IDA) cover part of 1990-1994 transport project preparation and October. Public Works investments of Central African environmental study. Republic,plan period and include IDA Project Preparation policy measures to improve road Facility advance of maintenance capacity and investment $750,000 has been approvec planning and to increase funding of for feasibility and .J -road maintenance program; rural road environmental studies. rehabilitation and maintenance, and Second PPF advance of improve transport policy-making and. $750,000 approved to cove implementation. The project would detailed engineering. also continue and expand development of ongoing training programs and institution building. Ministry of 10.0 (R) Forest Protection, Management Consultant services Appraisal completed. Forests (IDA) and. Wood Utilization - Forest required for project inventory, forest management plan, execution; national forestry protection measures, forest inventory and institutional development of institutional - forestry service. strengthening of Ministry of Forest. Ministry of Rural 20.0 Agriculture Institutions Adjustment Consulting services for Project under preparation. Development (IDA) - To support institutional project preparation have restructuring of the Ministry of been contracted. Rural Development, and of research and extension services. Ministry of 10.0 Enterprise Rehabilitation and To be determined. Project preparation under Industry/CAPMEA (IDA) Development - The project would: (a) way. . . .support enterprise development and rehabilitation in industry through an APEX line of credit and (b) enhance the scope and effectiveness of the SME development program. CHAD .To be determined 20.0 (R) Environmental Management - To Consultants will be Project under preparation. (IDA) improve natural resource management. rquired (estimated at 100 Total project cost is estimated at staffweeks). $21.0. Ministry of 20.0 (R) Agricultural Services - Consultants will be Project under preparation. Agriculture (IDA) Promotion of effective agricultural required (estimated at support services primarily focusing 200 staffwck ). on research and extension. Total project cost estimated at $21.0 million. Ministry of 10.0 (R) Social Development Action Consultants will be Negotiations scheduled for Planning . (IDA) Program - The project's objective is required. * September 1989. to mitigate the transitional effects (Cofinancing will be of the adjustment process on the required). vulnerable population groups by: (a) stimulating employment generation efforts through increasing access to training facilities and productive assets for poor people; (b) improving health and living conditions of urban groupsa and (a) reinforcing the Government's capability to design and monitor well-targeted programs to improve social conditions. Total project cost estimated at $24.9At. -7- Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 ASencv Lender2 CHAD (Cont'd) Ministry of 60.0 (R) Transport Sector Adjustment - Technical assistance for Approved by the Executive Public Works and (IDA) Rehabilitation and maintenance of institution building and Directors on April 25, Ministry of basic transport infrastructure, supervision work. 1989. Credit signed on Transport related institution building and Consulting services for June 22', 1989. - ' policy reforms. Total project cost sector studies also (Co-financing with BDEAC estimated at $180.0 million. required. for $10.6 million, EDF (France) for' $4.8 million, FAC (France) for $3.3 million, KFW (Germany) for $22.7 million, UNDP for $0.5 million, USAID for $23.0 million AfDB for $11.3 million, CCCE for $13.1 million, and OPEC for $4.5 million, has been confirmed). Ministry of Mines 35.0 (R) Petroleum/Power - To support To be determined. Appraisal mission and Energy (IDA) implementation of a least cost tentatively scheduled for product supply system and provide September. technical assistance to strengthen the Government's management of the IDA Project Preparation power and petroleum sector. Total Facility advance of project cost estimated at $105.0 $1,000,000 approved to million. help finance. start-up. To be determined 30.0 (R) SAL I - To follow through on To be determined. Project under preparation. (IDA) reforms begun under the financial rehabilitation credit. May include: (a) reforms to broaden tax base and improve tax administration; (b) public investment review; (c) effort to strengthen, privatize or liquidate certain public enterprises; and (d) restructuring of public administration. Additional components possible. COMOROS Ministry of 9.5 Population and Human Resources - To,be determined. Project preparation under Education and (IDA) Project based on health financing way. Ministry of review and consultation with donors' Health community. Ministry of 12.0 (R) Macroeconomic Management - To Consultants will be Project under preparation. Finance (IDA) Improve public finance management; required. develop medium-term incentives; diversify exports and promote growth in the agricultural and industrial sector, and protect the environment. CONGO. PEOPLES REPUBLIC OF THE Ministry of Plan 10.0 Third Technical Assistance - To Consultant will be Preparation delayed until and Finance (Bank) provide support to the Government's required. macro issues are resolved. economic adjustment program. The project will be processed in conjunction with SAL II. -8- kember Country, Amount & Project3 Consulting Services Stage of Processing and and Im?lementing Probable Action on Procurement4 Agency Lender2 CONGO, PEOPLES REPUBLIC OF THE (Cont'd) Ministere du 13.5 (R) Extension and Adaptive Research Consultants will be Negotiations completed. Developpement (Bank) - To build up extension services and required for short term Board presentation Rural an adaptive research system to consultancies during tentatively scheduled for effectively respond to farmers' implementation. September 1989. needs. Second Project Preparatio Facility advance of $750,000 approved for essential start-up activities (equipment, technical assistance, training and extension). Ministere des Up to (R) Roads Rehabilitation - Consultants have been Negotiations tentatively Travaux Public, 27.0 Rehabilita-tion and maintenance of recruited under Bank scheduled for September. de la (Bank) priority road network. Project Preparation Construction, de Facility advance of $1.5 l'Urbanisme at de million. 1'Habitat Ministere des 25.0 Urban Project - To promote resource Consultants will be Preparation delayed until Travaux Publics, (Bank) mobilization and provide for required for project macro issues are resolved. de la improved land development preparation. Construction, de operations. l'Urbanisme at de l'Habitat Ministere de 40.0 (R) Education Sector Adjustment - Consultants will be Preparation mission in the 1'Education (Bank) (a) To improve resource allocation required under Project field. (Cofinancing from and management in the sector; and Preparation Facility for AfDB and Japan is being (b) to reorient educational system execution of action plan. sought). to the needs of the economy. Ministry of Plan 70.0 SAL II - To support the Government Consultants will be Preparation delayed until and Finance (Bank) in its efforts to diversify the required. macro issues are resolved. economy, promote private sector activities, institute reforms of the banking sector, and further streamline the management of public enterprises that have remained in the Government portfolio. Ministry of 20.0 Private Sector Development - Project Consultants will be Project under preparation. Commerce/Ministry (Bank) would reinforce the role of the required for project (Cofinancing to be of Industry private sector in the economy preparation. identified). through: (a) continuation of the liberalization/deregulation of the business environment started under the SAL, (b) implementation of additional policy reforms; (c) introduction of positive measures to promote private sector activities; and (d) financial support either for policy changes or as direct investment funds in terms of a line of credit. -9- Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency Lender2 COTE D'IVOIRE To be determined 60.0 (N) Human Resources Adjustment I - Consultants will be Project under preparation. (Bank) To accelerate national development required. by supporting evolution of a global human resources development policy and improving strategic sector management. Ministry of 77.0 (R) Agricultural Exports Consultants will be Appraisal report under Agriculture and (Bank) Diversification and Promotion - required during project preparation. Rural First phase of the project aimed at implementation for export Development; and promoting diversified agricultural promotion and specific Ministry of exports through a line of credit, an studies and training. Commerce export promotion agency, training, studies and technical support. Ministry of 30.0 Agricultural Services - The project To be determined. Project preparation under Agriculture, and (Bank) would provide the necessary support way. Ministry of to reorganize/reinforce the current Scientific structure of key agricultural Research services (research, extension) to ensure the adequate supply and diffusion of alternate technologies and cropping systems to permit increased productivity. Ministry of 10.0 Agriculture Sector Support - Project To be determined. Appraisal report under Agriculture and (Bank) would finance specific activities preparation. Ministry of program included in Government's Women's Affairs letter on Agriculture Development Policy underlying Agriculture Sector Adjustment Loan: (a) studies (agricultural parastatal rehabilitation, pricing, divestiture, agricultural education), and (b) rural savings and loans associations, annual programs to strengthen rural/urban linkages. Ministry of 20.0 (R) Young Farmers - First phase of a To be determined. Appraisal scheduled for Agriculture and (Bank) national program to settle young October. Rural Development rural adults in productive activities in rural areas. Project A PPF advance of $750,000 would put emphasis on improved has been approved. access to land and agricultural services (extension, credit, inputs). Ministry of Water 80.0 (R) Forestry Sector - Protection and Technical assistance Negotiations completed. and Forestry (Bank) sustainable management of natural required for forestry Board presentation forests; participation of private inventories and forest scheduled for September. logging/wood processing companies in management plan, forest management; reform of logging management of parastatals and fiscal policies; maintenance of and monitoring and existing industrial plantations and evaluation. completion of planting programs on existing sites; forestry research programs; and institutional strengthening. - 10 - Member Country, Amount & Project3 Consulting Services Stage of Processing and ad I lementing Probable Action on Procurement4 Agency. Lender2 COTE D'IVOIRE (Cont'd) Ministry of 150.0 (R) Agricultural Sector Adjustment - To be determined. Negotiations completed. Economy and (Bank) To consolidate and expand structural Board presentation Financje;:Ministry adjustment reforms in the scheduled for August 1989 f Agriculture; agricultural sector, including price Ministry of Rural and incentive policy, land tenure, Development; and public agricultural investments, Ministry of parastatals, and rural financial Forestry intermediation. MLnistere de 66.0 (R) Municipal Development - Country- Consultants would be Negotiations completed. 11interieur - (Bank) wide strengthening of local required for the Direction des government institutions through implementation of the Collectivites technical assistance to Ministry of institutional components Locales and Interior; creation of a municipal of the project. Direction et. development fund, resource .Controle des mobilization program and implementa- Grands Travaux tion of urban infrastructure works in selected cities. Ministry of 100.0 Transport Sector - Improvement of Consultants would be Project under preparation Public Works; and (Bank) port facilities and institution required to review Ministry of building; time slice of road different aspects of the Marine Direction investment program, improvement of transport sector and for et Controle des maintenance; feeder road program; the implementation of the Grands Travaux assistance for rehabilitation of institutional components Ivorian railway and airport of the project. facilities; policy measures to enhance efficiency of various modes including shipping. Ministry of 80.0 (R) Water Supply and Sewerage Sector Consultants not required. Negotiations completed. Public Works and (Bank) Adjustment - Institutional and Transport; financial reform of the urban and Direction and rural water supply and sanitation ..Control of Large sector. Public Works Ministry of 21.9 (R) Abidjan Lagoon Environmental Final design and tender Negotiations completed. Defense and (Bank) Protection - Policy reforms documents underway by Marine; Direction concerning institutional Government (DCGTX). and Control of responsibilities regarding enforcing Large Public pollution standards and operation Works and maintenance of existing and future sewerage systems; improved cost recovery; civil works, including construction of an ocean outfall, completion of a sewer interceptor and connection of quarters already provided with tertiary severs with main interceptor. Ministries of 100.0 (R) Energy Sector Adjustment - To be determined. Negotiations completed. Mines and (Bank) Project will support Government Board presentation Industry energy reform program initiated scheduled for November 14, under SAL III of parapublic sector 1989. efficiency improvement, tariff (Cofinancing confirmed policy reform, and investment with AfDB for $150.0 decision-making. million). - 11 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Imlementing Probable Action on Procurement4 Agency Lender2 COTE D'IVOIRE (Cont'd) Office National 40.0 Third Telecommunications - The To be determined. Project preparation under des (Bank) project would support: (a) the way. Telecommunica- implementation of reform measures tions, Office regarding sector restructuring and National des institution building of ONT; (b) Postes expand geographic coverage and extend digital services to meet unsatisfied demand and to improve service quality; and (c) improve the efficiency of the postal sector and its operating entity ONP. DJIBOUTI Ministry of 4.6 Manpower Training - Strengthening Consultants will be Appraisal report under Education (IDA) coordination of vocational and required. preparation. technical education improving access to and relevance and quality of primary education; strengthening managerial capacity of Ministry of Education. Ministry of About (R) Urban II - Project would include To be determined. Project now in Reserve Public Works 6.6 (a) strengthening institutions program. Further (IDA) responsible for urban management; reporting will be (b) upgrading drainage works; (c) discontinued. assistance to housing and construction industry; and (d) co- ordination of sector as a whole. Electricite de 9.2 (R) Geothermal II - To develop for Bids have been received Credit approved by the Djibouti (EdD) (IDA) power generation the geothermal for scaling study and Executive Directors on resources identified by the first award to be confirmed June 29, 1989. geothermal exploration project. soon. Asset revaluation study under PPF financing A PPF advance of $550,000 is also being awarded. has been approved. EQUATORIAL GUINEA Ministry of Plan 8.0 (R) SAL I - To support the Consultants may be Negotiations tentatively (IDA) government in its efforts to required. scheduled for October 30. diversify the economy, promote private sector activities, institute reform of the civil services, and improve macroeconomic management. Ministry of 10.0 (R) Export Crops and Agricultural Consultants will be Appraisal mission Agriculture, (IDA) Services - The project would support required for project tentatively scheduled for Livestock and the activities of the Ministry of implementation. end October. Rural Development Agriculture related to the strategy To be determined. for the foodorops subsector with the objective of guaranteeing domestic food security and giving substantial boost to the diversification of agricultural exports to neighboring countries. The project would provide support for: (a) the production of food and cash crops; (b) marketing and export of foodcrops and cash crops; and (c) strengthening of extension and research services and cooperative development. - 12 - Member Country, Amount & Project3 Consulting Services Stage of Processing ar and Imylementins Probable Action on Procurement4 Aiency Lender2 EQUATORIAL GUINEA (Cont'd) Ministry of 4.0 (R) Health - To assist Government Consultants will be Project under preparation Health (IDA) initiate sector reorganization and required. Preparation mission policy reforms. Rehabilitate basic scheduled for September. health infrastructures and services. Formulate a primary health care strategy and an essential drug policy. ETHIOPIA Ministry of 40.0 (R) National Coffee Development - Consultants will be Appraisal report under Coffee and Tea (IDA) The project would strengthen required. preparation. Development government support services for food and coffee production in the major coffee producing areas. Support would also be given to expanding washed coffee primary processing factories, rehabilitating coffee hulleries and improving export processing facilities. To be determined 40.0 Population I - To launch To be determined. Project under preparation. (IDA) implementation of Government population policy and strategy. Ministry of About Mining and Energy - 5 major Consultants will be Project under preparation. Mining and Energy 55.0 components: (a) power transmission required. A PPF advance of $750,000 (IDA) and distribution, (b) small-scale will be requested. gas utilization, (c) rehabilitation, modernization and expansion of Assab Oil Refinery, (d) petroleum exploration promotion and (e) mining sector development with emphasis in gold mining and sector institutions development. Ministry of About Industry - To facilitate policy To be determined. Project under preparation. Industry 40.0 reforms, stimulate export growth, (IDA) and improve productivity at the factory level to expand financial resources to private and public sectors for industrial development through the AID Bank to finance technical assistance for investments in manufacturing for export development and promotion strategy; and to improve the efficiency of industrial production for the domestic market. - 13 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Imylementing Probable Action on Procurement4 Agency Lender2 GABON Ministry of Plan 5.0 First Technical Assistance - Support Consultant will be Negotiations completed. (Bank) for strengthening critical required. Board presentation to be institutions during adjustment scheduled. period. Areas to be covered IBRD Project Preparation include: (a) public investment Facility advance of planning; (b) statistics; (c) public $580,000 was approved July enterprise reform; (d) civil service 7, 1988. reform; and (e) SME promotion. Ministry of 30.0 (R) Road Maintenance - Three year Consultants will be Approved by the Executive Public Works, (Bank) program of road maintenance. required for technical Directors on April 27, Equipment, assistance. 1989. Loan signed on July Construction and 10, 1989. Territorial Development Procurement under way for certain components. THE GAMBIA To be determined 5.0 (R) Women in Development - Improve Consultants will be Appraisal mission (IDA) women's income earning potential and required (estimated at scheduled for October. welfare through increasing 55.5 staffweeks). accessibility of women farmers to agricultural extension services and credit strenghtening functional literacy and skill upgrading programs; information, education and communication campaign to increase awareness of women's needs; strengthen health/family planning. Central Bank of 23.0 (R).SAL II - A second structural Consultants will not be Approved by the Executive Gambia (IDA) adjustment credit to support required. Directors on June 8, 1989. recovery program started in first Credit signed on June 22, SAL. The program focusses on public 1989. resource management, agricultural policy and public sector management. (Cofinancing by AFDF for $6.0 million/FUA 5.0 million). Dutch Government has confirmed special joint financing participation for $2.5 million/Guilders 5 million). Ministry of 10.0 (R) Education Sector Credit - Consulting services Appraisal report under Education (IDA) Improve access to and quality of estimated at 20.3 staff preparation. primary education through classroom weeks, will be required. construction development, procurement and distribution of textbooks, improvement of teacher training and development of Government's capacity to promote more cost-effective use of resources in the education sector. Ministry of 10.0 (R) Agricultural Services - Further Consultants will be Project preparation under Agriculture (IDA) development of research, extension required (estimated at way. and credit services nationwide. 100 staff weeks). Total project cost estimated at $20.0 million. - 14 - Member Country, Amount & Project3 Consulting Services Stage of Processing and Im lementing Probable Action on Procuremen Agencv Lender2 GHANA Volta River 50.0 (R) VRA Sixth Power - Consists of To be determined. Appraisal mission in thi Authority (VRA) (IDA) essential investments through 1995, field. including major retrofitting of Abosombo generating station. Ministry of 24.0 (R) Agricultural Diversification To be determined. Appraisal mission in the Agriculture (IDA) (Tree Crops) - Nucleus estate and field. smallholder development and upgrading of processing facilities in oil palm, rubber and coffee, and support for coconut research. Ministry of 34.0 (R) Education II - Budgetary support To be determined. Appraisal report under Education and (IDA) for second phase (1990-1992) of preparation. Culture structural reform in educational system, policy changes in financing of educational sector. Ministry of Works 30.0 (R) Urban II - Project would cover To be determined. Appraisal tentatively and Housing; (IDA) urban infrastructure rehabilitation scheduled for November. Ministry of Roads and maintenance housing, property and Highways revaluation, local government financial institutional reform and housing sector reform. Ghana Water and 25.0 (R) Water Sector Rehabilitation - Consultants will be Approved by the Executiv, Sewerage (IDA) Rehabilitation and reinforcement of required for: (a) Directors on June 14, Corporation water supply systems in regional detailed design and 1989. Proposals have bei (GWSC) centers. Institutional development supervision of requested for engineerin of GWSC. rehabilitation and services and project expansion works; (b) management are being design of Tamale water evaluated. supply expansion; (c) technical assistance; and (d) tariff study, fixed asset revaluation, Accra sewerage study, and leak detection. Ministry of 45.0 (R) Agricultural Sector Adjustment - To be determined. Project under preparatior Agriculture (IDA) To strenthen pricing and trade reforms already under way. This policy based lending will support further reforms and investments necessary to accelerate agricultural growth. Ministry of 25.0 Health and Population II - Project To be determined. Identification report Health (IDA) being identified on the basis of under review. sector work. Electricity 40.0 ECG Fifth Power - Project consists Consultants required for Board presentation Corporation of (IDA) of: (a) completion of sector reforms preparation of long-range scheduled for August. Ghana already started under ongoing power regional capital (Co-financing of US$58.2 projects; (b) improve and extend distribution plan. million identified). ECG's subtransmission and Consultants selected for distribution system; (c) a study of engineering and technical long-term 'subtransmission and assistance and for distribution needs; (d) technical national electrification. assistance, management development and training programs. Total project cost is $117.7 million. - 15 - Member Country, Amount & Project4 Consulting Services Stage of Processing and and Im?lementing Probable Action on Procurement4 Agency Lender2 GHANA (Cont'd) Bank of Ghana 20.0 Rural Finance - Strengthening and To be determined. Approved by the Executive (IDA) rationalization of rural financial Directors on June 14, institutions, improving mechanisms 1989. for rural finance, and strengthening Bank of Ghana's supervisory capacity of rural banking. GUINEA Ministry of 25.0 (R) Agricultural Export Promotion - Consultants are being Project under preparation. Agriculture and (IDA) To support strengthening of recruited for project PPF advance of $250,000 Animal Resources incentives, public/private sector preparation. proposed. (MARA) collaboration, and streamlining of regulations. Project would include provision of technical assistance and training, upgrading/expanding key export infrastructure, and establishment of a line of credit. Ministry of 8.0 (R) Forestry and Fisheries (formerly Consultants will be Negotiations tentatively Agriculture and (IDA) Natural Resources Management required to provide scheduled for August. Animal Resources Program) - Launching of protection technical assistance (Cofinancing from FRG (MARD), State and improved management of forestry during implementation. (KFW), FED, CIDA, Caisse Secretariat for and marine fisheries resources, and Centrale). Fisheries (SEP) environmental protection measures through institutional rehabilitation, and finances from operations. ENELGUI 35.0 Power II - Project would seek to: To be determined. Project under preparation. (IDA) (a) help exploit Guinea's hydro (Possibility of co- resources and reduce oil import financing with CCCE, AfDB, bill; (b) provide power utility KFW, GTZ, CIDA, Japan). infrastructure for industrial and commercial activity in the main development zone (Conakry/KLindia region); (c) begin first phase of transmission backbone facilities to provide for an Interconnected national power grid; (d) reduce need for costly auto-generation by providing more reliable service; and (e) extend access to service by providing for a time slice of ENELGUI distribution investment program. Secretariat of 15.0 Telecommunications - Reorganization Consultants will be Project under preparation. State for (IDA) of post and telecommunications required for project Telecommunica- sector. Program for strengthening preparation. tions new entity to manage and operate the sector, program for rehabilitation of local (Conakry) and trunk network, vehicles and miscellaneous equipment. Ministry of 17.4 (R) Investment Promotion Adjustment Consultants will be Appraisal report under Industry and (IDA) Operation - To support and required to provide preparation. Human Resources consolidate: (1) industry policy technical assistance reform aimed at improving the during-project investment climate; and (ii) preparation and financial sector reform including implementation. interest rate policy, central bank regulation and supervision. - 16 - Member Country, Amount & Project Consulting Services Stage of Processing ad Implementing Probable Action on Procuremen Agency Lender2 GUINEA (Cont'd) Ministry of 20.0 Second Urban - Strengthen urban To be determined. Appraisal scheduled for Equipment and (IDA) management and rehabilitation of October. Urban priority infrastructure in Conakry and selected secondary cities in support of Government's economy recovery program. Ministere de 10.0 Education Sector Adjustment - To Consultants will be Appraisal report under l'Education (IDA) assist Government in defining a required for preparation preparation. long-term human resource development and implementation. strategy, in improving programming of capital and recurrent outlays and in making operations financially more efficient, while undertaking rehabilitation of the sector. Ministry of 35.0 (R) Rural Infrastructure - Project Consultants will be Appraisal report under Agriculture and (IDA) will aim at improving rural required for project preparation. Animal Resources infrastructure, policy formulation, implementation. PPF advance totalling (MARA) rehabilitation and maintenance $400,000 was required foi capability, preparation work. A second PPF advance of $300,000 has been approvi to prepare a National Scheme of rural roads. GUINEA-BISSAU Ministry of 22.0 Infrastructure Rehabilitation - Consultants will be Negotiations tentatively Social Equipment (IDA) Rehabilitation of national and required for project scheduled for October. feeder roads, preparing serviced implementation. Two PPF advances housing plots and demonstration aggregating US$1.5 millic homes, and expanding solid waste are being used for projec collection. The project also preparation. includes institutional strengthening, technical assistance to public transport companies and a comprehensive training program. Ministry of Rural 6.0 Agricultural Sector Development - To To be determined. Project preparation under Development and (IDA) support credit, fisheries, food way. Fisheries production and export, and livestock to establish public agricultural services such as extension, research and marketing. National Bank of 23.4 (R) SAC II - Continuing support of To be determined. Approved by the Executive Guinea Bissau (IDA) structural adjustment program, and Directors on May 18, 1989 facilitate the continued expansion Credit signed on June 29, of the economic activity while 1989. reforms are being implemented. (Cofinancing expected fron ADB, Netherlands and USAID, and possibly Sweden). Retroactive financing of up to US$3.8 million may be sought. - 17 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency Lender2 GUINEA-BISSAU (Cont'd) Ministry of 5.0 (R) Social and Infrastructure Relief Consultants selection Approved by the Executive Planning (IDA) (SIRP) - Emergency assistance to under way for project Directors on May 18, 1989. alleviate the social costs of implementation. Credit signed on June 29, adjustment including infrastructure 1989. rehabilitation, site development for low-cost housing, health and Project Preparation education supplies, reorientation of . Facility advance of displaced civil servants and studies $1,380,000 has been used of the social dimensions of - to finance consultant for adjustment. project preparation. KENYA Ministry of About (N) Industrial Enterprise To be determined. Project under preparation. Finance 70.0 Restructuring - Provide assistance (IDA) to key segments of the industrial sectors in improving efficiency and to development of financial institutions in reorienting their functions and restructuring their portfolios. Ministry of About Export Promotion - To assist the To be determined. Project under preparation. Industry and 15.0 Kenya Government in setting up an Technology; (IDA) export processing zone. The project Ministry of should support infrastructure, Finance policy and institutional development. National Council 20.0 Population IV - Continued support To be determined. Project under preparation. for Population (IDA) for the population sector through and Development promotion of demand creation activities and increasing the supply of family planning services. The project would support population activities through government, ministries and non-government organizations. Central Bank of 5.0 (R) Financial Sector Technical Consultants have been Credit approved by the Kenya (IDA) Assistance - Strengthen capabilities appointed. Executive Directors on to manage financial and monetary July 11, 1989 and signed development. Support the on July 12, 1989. establishment of a college of banking and finance. Ministry of About Health Rehabilitation - Consultants will be Project under preparation Health 15.0 Rehabilitation and reform of the required. (IDA) Kenyatta National Hospital in the context of the introduction of cost- sharing in the sector. Preparation of future sectoral reform. Ministries of About Agricultural National Extension II - To be determined. Project under preparation Agriculture and 30.0 Followup project to the National Livestock (IDA) Extension Project now under Development preparation. - 18 - Member Country, Amount & Project3 Consulting Services Stage of Processing at and Imylementing Probable Action on Procurement4 Agency Lender2 KENYA (Cont'd) Nairobi City About Nairobi Water III -- Rehabilitation No Consultants required. Negotiations completed. Commission, Water 65.0 and expansion of the Nairobi water Board presentation and Sewerage (IDA) supply and sewerage systems; scheduled for July 25, Department training and technical assistance. 1989. (Cofinancing with EIB for $18.6 million, AFDB/Fund for $35.2 million, OECF for $40.0 million, IDA foi $64.8 million, WSD for $52.3million, Government of Kenya for $3.6 million). Ministry of About Forestry IV - Support for To be determined. Project preparation under Environment and 55.0 development of the forestry sector way. Natural Resources (IDA) (fuelwood/agro-forestry timber, natural forest conservation, institutional strengthening). Ministry of About Health Sector Adjustment - Support Consultants will be Project preparation under Health 50.0 widespread sectoral reform. required and are likely way. (IDA) to be financed under the Health Rehabilitation Project. Central Bank of 125.0 (R) Financial Sector - Support Consultants have been Credit approved by the Kenya (IDA) changes in monetary policy, capital appointed. Executive Directors on market development and strengthening June 27, 1989 and signed financial institutions and on July 12, 1989. supervision thereof. An IDA PPF advance of US$285,000 has been approved to finance completion of project preparation, consultants, legal assistance and computer equipment. Ministry of About (R) Coffee II - Redress key Consultants may be Negotiations scheduled for Agriculture 41.6 financial, production, required. July 24. (IDA) institutional, marketing and policy constraints in the coffee industry. Ministry of About Education Sector Adjustment Program To be determined. Preliminary preparatory Education, 70.0 - Support a sector-wide program of work under way following Science and (IDA) reform to develop a viable report on education. Technology alternative for financing education through improved efficiency, more cost-effective resource use and public-private cost sharing while improving equity in access to and quality of education. LESOTHO Ministry of 9.5 (R) Industry/Agro-Industry - To be determined. Project preparation under Finance, Trade (IDA) Technical assistance for strategic way. (Co-financing will amd Adjustment development of industrial/agro- be required). industrial sector and financial intermediaries; apex line of credit to eligible financial intermediaries. - 19 - Member Country, Amount & Projecti Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency Lender2 LESOTHO (Cont'd) Lesotho Highlands About (R) Lesotho Highlands Water Consultants have been Project under preparation. Water Development 110.0 Construction I - Construction of appointed for technical (Co-financing will be Authority (Bank) concrete dam, water transfer tunnel assistance, engineering required). and associated works for sale of design, funding water to South Africa. arrangements, and environmental assessment; further consultancy services will be required to assist in preparation and evaluation of contracts during construction period. Ministry of 12.1 (R) Health/Population II - To reduce Consultants will be Approved by the Executive Health (IDA) infant/maternal mortality and required. Directors on July 11, population growth rates through 1989. improving maternal/child health services and population programs. Also to improve coverage effectiveness and cost efficiency of health services through improved management. MADAGASCAR Ministere de la About Coffee Sector - Would support Consultants likely to be Project under preparation. Production 31.0 conversion from low value to high required by FAO/CP and Agricole et de la (IDA) value production. Would reform Government. Reforme Agraire processing and marketing institutions. Orient research. Support training. Develop infrastructure of export crop areas. Ministry of About Population/Health/Nutrition - Assist To be determined. Project under preparation. Health 27.2 in development of population (IDA) activities and strengthen primary health care and maternal/child health services including impact, production and distribution of essential drugs, endemic disease control, including malaria. Institutional strenghening of Ministry of Health. Central Bank of About Incentive Promotion - To consolidate Consultants likely to be Project under preparation Madagascar 30.0 the reforms undertaken so far and to required. (IDA) support the next stages in the reform of the incentive system in support of private investment and exports. Ministry of About (R) Education Sector Reinforcement - Consultants likely to be Appraisal report under Education 40.0 To improve efficiency of the required. preparation. (IDA) education and training system with particular emphasis on policy and financial changes regarding higher education and basic education. Ministry of About (R) Structural Adjustment - The Consultants likely to be Project under preparatioi Finance 50.0 operation would address public required. (IDA) expenditure issues including public enterprises and consolidate the adjustment efforts to date. -20- Member Country, Amount & Project3 Consulting Services Stage of Processing a and Imylementing Probable Action on Procurement Agency Lender2 MADAGASCAR (Cont'd) Ministry of. About (R) Environmental Protection and To be determined. Appraisal report under Livestock, Water 30.0 Management (EPM) - Assist preparation. and Forestry (IDA) Government in implementing its (Co-financing expected policy through protection and from UNDP, USAID, management of biodiversity including Switzerland and possibly national parks, reserves and France). surrounding priority buffer zones, land security and management, soil conservation and agro-forestry actions, environmental education, training and communication, and a support program including developing environmental institutions, improving data base, promoting studies and research. Probable project cost about $80 million. Central Bank of 46.2 (R) APEX/Financial Sector - Would Consultants will be Negotiations scheduled fc Madagascar (IDA) include a line of credit for private needed for multi-facetted August. sector investments to be channeled technical assistance through the banking network. component. Office Militaire 38.7 Ilmenite Mining - Mining and export Consultants have been Project under preparation National des (IDA) of titanium dioxide and other contracted for technical (Co-financing being Industries mineral sands on Madagascar's East assistance to OMNIS. explored). Strategiques Coast. Total cost of project to be (OMNIS) determined. IDA Project Preparation Facility advance of $750,000 has been approved. Ministry of About (R) Tana Plain Development - Follow- Consultants have been Appraisal mission in the Public Works 29.0 up Water Supply and Sanitation I. recruited for project field. (IDA) Flood control of Antananarivo Plain preparation. and institutional strengthening for flood control, sanitation and land use. Ministry of About Energy II - The project will consist Consultants will be Project preparation will Industry, Energy 12.7 of power generation (Ambodiroka required. be handled under the and Mines (IDA) hydroplant) and distribution; Energy I project, which I- expansion of the carbonization of presently under Haut Mangoro; industrial energy supervision. efficiency projects; contributing to investments in the least-cost expansion plant of the petroleum sub-sector: and continuity for technical assistance for energy and power systems planning. Total project cost estimated at $80.0 million. Ministere de la 28.4 Pilot Extension - Assist Government To be determined. Project under preparation Production (IDA) in seeking sustainable increases in by Government. Agricole et de la agricultural production through an Reforme Agraire, improved and financially sustainable Agricultural - agricultural extension system Extension improving the technical content of Department the extension message through increased farmer participation, improved linkages with agriculture research, and human resources development improving the management and efficiency of the existing extension service: establishing a sound monitoring and evaluation system aimed at improved agricultural policy making. - 21 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement Aiency Lender MADAGASCAR (Cont'd) FOFIFA/Centre 24.0 (R) Agricultural Research - To Consultants, financed by Approved by the Executive National de (IDA) assist Government in establishing a other donors under Directors on June 15, Recherche national agricultural research parallel arrangements, 1989. Appliquee au policy focusing on priority multi- will be required. Development Rural disciplinary research programs, making research more demand driven focusing on real farmer constraints; strengthening necessary linkages with agricultural extension; reinforcing FOFIFA's managing capacity; integrating research programs through improved donor coordination; developing human resources; and rehabilitating research infrastructure. MALAWI Ministry of 20.0 (N) Third Family Health - Third To be determined. Preparation mission Health (IDA) phase of strengthening the health scheduled for September. services and the maternal and child health/child spacing program. Ministry of About Education Sector II - The project Consultants will be Appraisal report under Education 30.0 supports completion of unfinished required. preparation. (IDA) primary schools, and construction of centers for distance secondary education. It also supports teacher training and quality improvements, especially at the primary level. Electricity 46.7 (R) Energy I - Support for the Consultants required for Approved by the Executive Supply Commission (IDA) systematic development of the feasibility studies will Directors on March 14, of Malawi various energy sub-sectors, be paid for under a 1989. (ESCOM); and including least cost power system Bank/IDA Project (Cofinancing being Office of expansion. Preparation Facility. sought). President and Cabinet Ministry of About Infrastructure I - Financing of a Consultants will be Negotiations completed. Transport; and 28.8 time slice of agreed investment required for engineering Board presentation Ministry of Works (IDA) program in areas such as highway and and management services scheduled for mid-August and Supplies bridge rehabilitation, district and will be paid for (Cofinancing being roads maintenance, road safety, under a Bank/IDA Project sought). improved rural transport services, Preparation Facility. water supply and improved organization and planning. Ministry of About Institutional Development - Consultants for economic Approved by the Executiv Finance; Office 11.3 Strengthening the institutions and financial management Directors on June 13, of the President (IDA) responsible for economic and and for Malawi Institute 1989. and Cabinet financial management, including of Management have been establishment of Malawi Institute of identified. Consultants Management (MIM). being financed under a Bank/IDA Project Preparation Facility. Ministry of About (R) Agricultural Sector Adjustment - To be determined. Appraisal report under Agriculture 60.0 Policy based operation to increase preparation. (IDA) agricultural production through (Cofinancing being policy reforms, institutional sought). strengthening and reorientation of existing agricultural services. -22- Member Country, Amount & Project3 Consulting Services Stage of Processing ar and Imalementing Probable Action on Procurement Agency Lender2 MALI Ministere de 15.0 (R) Environmental Management - Consultants will be Project under preparation l'Envirronnement (IDA) Finance a wide range of multi- required (estimated at et de l'Elevage sectoral natural resource management 200 staffweeks). activities at village, departmental and national levels. To include field operations, training, data collection and analysis and institutional development. Total project cost is estimated at US$26.0 million. Ministere des 58.5 SAL I - Macro-sectoral policy Consultants will be Project under preparation. Finances et du (IDA) reforms addressing management of required. (Cofinancing being Commerce public resources, the structure of sought). incentives and agricultural policy framework. Retroactive financing under consideration. Ministeres de 35.0 (R) Agriculture SECAL - A combined Consultants will be Pre-appraisal mission l'Agriculture, et (IDA) investment/sector loan operation to required. tentatively scheduled for des Finances reform the cotton sector (pricing, September. taxation, institutional issues) and (CofinancLng expected with to consolidate cereals marketing Bundes Ministrium fur liberalization program. Program Wirtchafstliche will finance slice of five-year Zusammenarbeit (BMZ) for investment program, including $5.5 million and Swiss Aid investments in areas freed from $5.0 million). onchocerciosis. Livestock sector and World Development Organization's reform issues might also be addressed. Total project cost estimated at $100 million. Ministries of 10.0 Infrastructure/Transport Sector - Consultants will be Project being identified. Transport and (IDA) Would support preparation of required for preparing Public Works comprehensive 3 year investment the different project program focusing on maintenance of components. existing infrastructure and improved management of sector parastatals, based on detailed action plans. The problem of urban and interurban/international transport would be addressed. Ministere de la 25.0 (R) Population and Health - Consultants will be Negotiations scheduled for Sante Publique et (IDA) Improvement of health and family required to complete January 1990. des Affaires planning services in four of Mali's project preparation and (Cofinancing will be Sociales seven regions and in Bamako, project implementation. required). strengthening of regional and central level institutions responsible for population and health and supporting national family planning information services; assistance in formulation and implementation of action programs to carry out the population policy to be adopted by the government; increase in access to potable water supply and strengthening of national capabilities in managing operations in the water sector. Total project cost estimated at $50.0 million. -23- Member Country, Amount & Project0 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency? Lender2 MALI (Cont'd) Ministere de 20.0 Agricultural Services - Promotion of Consultants will be Project under preparation. l'Agriculture (IDA) effective agricultural support required (estimated at services, primarily focusing on 200 staffweeks). research and extension. Total project cost estimated at $30.0 million. Ministere de 26.0 (R) Education Sector Consolidation - Twinning arrangement with Credit approved by the 1VEducation (IDA) (formerly Human Resource Sector education training/ Executive Directors on Adjustment) - The project aims at: management institution June 29, 1989 and signed (a) implementing a sectoral will be sought under on July 19, 1989. adjustment program (SECAL): (b) USAID funding. increasing primary enrollment ratio; (c) improving the quality and relevance of primary education; (d) strengthening the management of human, financial and physical resources for the education sector at large; and (e) developing a strategy for the restructuring of secondary higher education. Implementation of the SECAL will be supported by a quick-disbursing element to be funded under the debt initiative. Total project cost estimated at US$56.2 million (including US$12 million for the quick disbursing element). Energie du Mali, 15.0 Water Supply II - Institutional Consultant services may Project under preparation. Direction (IDA) reform and financial rehabilitation be required. Nationale de of the Urban Water Supply Sector Procurement: ICB l'Hydraulique et including expansion of production, procurement for treatment de 1'Energie treatment and distribution system of plant, reservoirs and Bamako. Rehabilitation of four pipes. secondary centers, water supply systems. To be determined 15.0 (R) Irrigation Sector - To continue Consultants will be Project under preparation. (IDA) the rehabilitation of Office du required (estimated at Niger, but also to add the 200 staffweeks). rehabilitation of other major perimeters, e.g., Segou, undertake new perimeters and strengthen sectoral institutions and policies. Total project cost estimated at $21.0 million. MAURITANIA To be determined 20.0 (R) Agricultural Services - To Consultants will be Project under preparation. (IDA) strengthen key public services, required (estimated at principally research and extension. 200 staffweeks). Total project cost estimated at $30.0 million. Ministere de 20.0 (R) Public Enterprise Sector Consultants may be Appraisal mission 1'Economie et des (IDA) Adjustment and Technical Assistance required. scheduled for September. Finances - Continue reforms in the Public Enterprise sector. - 24 - Member Country, Amount & Project3 Consulting Services Stage of Processing anc and Im?lementing Probable Action on Procurement4 Agency Lender2 MAURITANIA (Cont'd) To be determined 10.0 Irrigation - Development of private Consultants will be Project under preparation. (IDA) irrigation plus selected required. (Estimated at rehabilitation of publicly- 100 staffweeks). constructed irrigation schemes. Total project cost estimated at US$40.0 million. SONADER 25.0 Agricultural SECAL/Irrigation Consultants will be Board presentation (IDA) Improvement - This is a hybrid required. (Estimated at tentatively scheduled for project including a sector-wide 400 staffweeks). October 10, 1989. adjustment operation and an (Cofinancing confirmed investment component to test various with CCCE-France US$8.0 approaches related to irrigation million; Government of development in the Senegal Valley. Federal Republic of Total project cost estimated at Germany US$2.0 million; US$37.0 million. and WFP-United Nations US$1.0 million). Ministry of 30.0 SAL II - While restructuring To be determined. Preparation mission Economy and (IDA) macroeconomic policies, emphasis tentatively scheduled for Finance will be placed on the continuation early FY90. and expansion of policy reforms in key sectors such as industry, fisheries, and the public sector. Ministry of 20.0 (R) Infrastructure: (a) complete Consultants will be Project dropped from the Interior and (IDA) rehabilitation of SONELEC; (b) required. lending program. Further SONELEC (Societe enforce contract programme; (c) reporting will be Nationale d'Eau reinforce Nouakchott water supply discontinued. et d'Electricite system, rehabilitate water and electricity system in interior centers; reduce water losses to acceptable levels; improve SONELEC's billing and collection and enforce manpower development program; (d) strengthen management of highway sector; introduce road repair system by contractors; and (e) upgrade basic infrastructure, build income generating facilities and enhance site-and-services type land development. Total project cost estimated at US$65 million. -25- Member Country, Amount & Project3 Consulting Services Stage of Processing and and Imlementing Probable Action on Procurement4 Agency. Lender2 MAURITIUS Ministry of Works About (R) Second Highway - Road Consultant appointed for Negotiations scheduled for 30.0 improvement and strengthening, road Engineering Studies for 2 August 21. (Bank) maintenance program, traffic lots (45 km). management, technical assistance and Consultancy services will training. be required for 3rd lot (16 km). Ministry of About Agricultural Services - Agricultural Consultants may be Project under preparation. Agriculture, 10.0 diversification through required. (Co-financing to be Fisheries and (Bank) strengthening policy-making and explored). Natural Resources agricultural serviceslinputs. Total project cost to be determined. Ministry of About Industrial Strategy Development and Consultants may be Project under preparation. Economic Planning 10.0 Manpower Training - To support required. and Development (Bank) industrial strategy, industrial development and manpower training. MOZAMBIQUE Ministry of 35.0 Second Education - To support Consultants will be Project under preparation. Education (IDA) efficiency and quality improvement required. of primary education and of basic science instruction for university. Ministry of 44.0 Industrial Enterprise Restructuring Consultants will be Appraisal report under Finance (IDA). - To finance rehabilitation of required. preparation. industrial sector enterprises and (Co-financing will be provide technical assistance. required). Secretariat for 33.0 Small and Medium-Scale Enterprise - Consultants will be Appraisal report under Food & Light (IDA) Support for government's ongoing required. preparation. Industry effort to provide credit and (Co-financing will be technical assistance to SMEs. required). Bank of About (R) Economic and Financial Consultants will be Negotiations scheduled for Mozambique 19.0 Management/Technical Assistance - required. August 7. (IDA) For economic planning, financial management and accounting and statistics. Ministry of About Agriculture Rehabilitation and Consultants will be Project under preparation. Agriculture 25.0 Development - To support required. (IDA) agricultural development in selected areas. Ministry of About Household Energy - Assistance to Consultants may be Negotiations completed. Industry and 22.0 urban households to reduce energy required. Approved by the Executive Energy (IDA) costs. Directors on June 8, 1989. Ministry of About (R) Transport Rehabilitation - Consultant services will Negotiations completed. Transport 45.0 Manpower development and training be required. Board presentation (IDA) for Mozambique railway and provision scheduled for September of locomotives. 14, 1989. - 26 - Member Country, Amount & Project3 Consulting Services Stage of Processing a and I lementing Probable Action on Procurement Azency Lender2 NIGER Ministere de la 20.0 Second Population and Health - To be determined. Project under preparatio. Sante, Ministere (IDA) Improvement and expansion of du Plan, maternal and child health and family Developpement planning services; strengthening of Regional management and coordination of population activities and expansion of program. To be determined 20.0 (R) Agriculture Services II - To be determined. Project dropped from the (IDA) Continued improvement of lending program. Furthez agricultural services, focusing on reporting will be agricultural education and possibly discontinued. credit. Ministere de 25.0 Water Supply II - Extension of Consultant have been Pre-appraisal mission l'Hydraulique (IDA) assistance to the new water recruited to provide scheduled for July. authority and to the Ministry of technical assistance to Hydraulics for rural water supply the water authority and An IDA Project Preparatio policy reform. Expansion of Niamey the Ministry. Facility advance of water supply. Total project cost $750,000 was approved to estimated at $70.0 million, of which finance: (a) feasibility $50.0 million in foreign exchange. study for the rehabilitation of existin urban water systems; (b) consultant to advise the general manager of the national water company; (c) preparation of a wate: sector report; and (d) miscellaneous vehicles anc office equipment for the water company. Ministeres de 20.0 (R) Human Resources SECAL - Consultants will be Appraisal mission in the l'Education, (IDA) Continued support to expand and required during field. du Travail et de improve quality of primary implementation. l'Enseignement education; restructuring of Superieur technical and vocational education and consolidation and quality improvement in higher education. To be determined 59.5 SAL II - Support further adjustment To be determined. Project under preparation. (IDA) of the economy by extending policy (Preliminary discussions changes to new areas such as on next SAL were held in industry and trade, and the banking June in conjunction with sector while deepening reforms in Public Expenditure Sector agriculture and public resource Adjustment review management. mission). Ministere de 20.0 Agricultural Research - Promotion of Consultants will be Negotiations tentatively l'Agriculture (IDA) effective research. Total project required. (Estimated at scheduled for December. cost estimated at US$42.0 million. 400 staffweeks). (Co-financing likely from (FAC (France); USAID also approached). Ministere de 20.0 Environment Management - Finance a Consultants (estimated at Project under preparation. l'Agriculture et (IDA) wide range of multi-sectoral natural 400 staff weeks) will be (Co-financing expected du Service des resource management activities at required. with CCCE/FAC (France) for Resources village, departmental and national $8.0 million). Animales levels. This will include field operations, training, data collection and analysis and institutional development. Total project cost estimated at $27.0 million. - 27 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Imylementing Probable Action on Procurement4 ARency Lender2 NIGER (Cont'd) Ministry of 35.0 Infrastructure/Transport Sector - Consultants required to Project under preparation. Public Works; (IDA) Project would include: road design and supervise road Ministry of maintenance works and construction works, elaborate an Transport of feeder and secondary roads a action plan for improving support to the private consulting transport and provide and contracting industry; support to technical assistance to the transporters; reorganization of institutional domestic air transport; and development. continuation of institution building initiated under previous projects. Total cost of project would be $180.0 million. NIGERIA Federal Ministry 130.0 Primary Education - To improve To be determined. Project under preparation. of Education (Bank) quality, financing, information thru' National base, and institutional capacity by Primary Education the provision of books and other Commission instructional materials, raising personnel accountability, improving statistics and research, and supporting the National Primary Education Commission, Primary Education and Implementation Units in Federal Ministry of Education. Federal Ministry 100.0 (R) Federal Universities Development To be determined. Appraisal mission in the of Education and (Bank) - Financing backlog of educational field. National inputs for Federal universities Universities using NUC as intermediary Commission (NUC) institutional strengthening mainly for universities and NUC. Federal Ministry 60.0 (R) National Population - To assist Preparation work by local Appraisal mission of Health and (IDA) in initial stages of new National consultants financed by tentatively scheduled for other Federal Population Program by supporting UNFPA is under way. August. agencies with institutional development, training, Other use of consultants collaborating research, and priority service to be determined. states and local delivery/demand creation activities. governments and Subprojects requiring support to be NGOs agreed periodically but initially likely to include family planning, public information, health education, population education through the schools, and integration of population considerations into planning. Industrial 8.4 (R) Industrial Training Fund - To Project preparation has Appraisal mission awaiting Training Fund (Bank) assist the Ministry of Industries in been completed by ODA approval by ITF governing (ITF) expanding and improving support to consultants. council scheduled to the industrial sector through in- convene mid-July. plant training, apprenticeships, and vocational training programs. Federal Ministry 70.0 (R) Health System Fund - Credit line Consultants appointed for Appraisal mission in the of Health (Bank) through merchant banks for health project preparation. field. subprojects in the various States including institutional development, strengthening of primary health and MCH service and essential drug programs. - 28 - Member Country, Amount & Project3 Consulting Services Stage of Processing . and Imlementing Probable Action on Procuremen Agency Lender2 NIGERIA (Cont'd) Federal 200.0 Multi-State Water I - Program of Consultants will be Project preparation undo Government of (Bank) physical rehabilitation, improved required for detailed way. Contracts are beii Nigerial Several operation and maintenance practices, engineering design and negotiated for consultax State Water investment planning and financial supervision. services to carry out tl Boards management, and manpower development feasibility study in eat to improve access to public water of the three States. supply in Cross River, Imo and Katsina States. Federal Ministry 17.0 (R) National Seed -.Strengthening of To be determined. Appraisal report of Science and (Bank) national seed service. completed. Negotiations Technology tentatively scheduled fc August 28. Federal Ministry 68.1 (R) Essential Drugs - Establishment Consultants will be Negotiations completed. of Health and (IDA) for federal-hospitals and health required to assist in Board presentation State Health programs in 4 states of systems for installation of strong tentatively scheduled fo Ministries in procuring, storing, distributing, financial management August. Bendel, Cross and prescribing safe,.low-cost and systems and in such River, Gongola, appropriate pharmaceuticals. Cost specialized areas as Procurement: Government and Kwara recovery and drug revolving funds procurement management, has recuested that up to are being established at all levels. drug inventory $2.7 million in Federal systems for quality management, drug expenditures on local assurance and drug inspection, for registration, drug financial management drug regulation and information,are information, drug consultants, also being strengthened. regulation, drug quality rehabilitation of medica control and biomedical stores, and training be engineering/instrumenta- financed retroactively t tion. continue the momentum of project preparation. Nigerian National 150.0 Oso Condensate - To develop the Oso To be determined. Project preparation undei Petroleum (Bank) Field condensate for export way. (Cofinancing with Corporation production of condensate, through Export Credit agencies ai (NNPC) the construction of various site commercial banks being facilities. Project to be developed sought). IFC also as a joint venture between NNPC and expected to participate MPN (Mobil Producing Nigeria). behalf of MPN. Federal Ministry 106.0 (R) Tree Crops - Oil palm planting, Consultants would be Negotiations substantial] of Agriculture, (Bank) palm oil and rubber processing; required for completed. Board Water Resources & technical assistance for management strengthening management presentation scheduled fc Rural Development and technology improvement, and technical inputs of August 1989. project. Federal Ministry 240.0 Water Rehabilitation Fund - Consultants have Preparation under way. of Agriculture, (Bank) Provision of funds through FMAWR to commenced assessment of Water Resources assist states with rehabilitation of urban water facility Bank Project Preparation (FMAWR) and Rural existing water supply facilities, rehabilitation needs. Facility advance of $0.3 Development provide sector training; accounting, million approved to systems; technical assistance. finance technical assistance/rehabilitation studies. National Electric 70.0 (R) Power System Maintenance and. Consultants would be Negotiations completed. Power Authority (Bank) Rehabilitation - Project consists of required for technical Board presentation (NEPA) critical and much delayed assistance. scheduled for August 1989 maintenance and rehabilitation of selected existing facilities to Procurement: Provision prevent further deterioration in has been made for advance power supply, and institutional contracting and strenshthening of NEPA. The project retroactive financing of would help prepare the ground for upto US$7.0 million for Implementing a medium term recovery essential equipment and program of NEPA. consulting services. - 29 - Member Country, Amount & Projecti Consulting Services Stage of Processing and and Im?lementins Probable Action on Procurement4 Agency Lender2 NIGERIA (Cont'd) Ministry of Works 69.5 Urban - Infrastructure Development Technical assistance for Loan signing tentatively and Housing (Bank) Fund. Establishment of new Fund operation. Design scheduled for July 20, mechanism to identify, prepare and and supervision of Fund 1989. finance urban infrastructure subprojects. Technical investment. Technical assistance assistance to borrowing from local sources provided for states and local setting up and operation of Fund, authorities for improved pilot operations in several states financial management and included. Financing for second urban services. tranche of sub-projects to be Consultants selected and selected and appraised during detailed engineering due implementation of project. Total to begin shortly on Bank- cost estimated at $96.8 million, of appraised sub-projects. which about $69.5 million in foreign exchange. Ministry of Works 250.0 Highway Sector - Construction, Consultants are required Approved by the Executive and Housing (Bank) strengthening, rehabilitation and for detailed designs and Directors on June 16, periodic maintenance of federal economic analyses, 1988. Date of loan highways. Total project.cost supervision of road signing yet to be estimated at $953.4 milliony--of--- improvement works; confirmed by Government. which $622.5 million in foreign maintenance management, (Japan Exim-Bank has exchange. This represents the total system development and expressed interest in co- proposed highway investment and training, and financing. Saudi-Fund recurrent maintenance program for strengthening also expressed interest in 1989/1991, the expected disbursement institutional capacity. co-financing $30.0 period. million). Procurement: Provision has been made for advance contracting of up to a maximum contract value of $75.0 million and retroactive financing of up to $25.0 million. Ministry of -200.0 Public Enterprise Restructuring and Initial financing of Further processing yet to Finance (Bank) Technical Assistance - Assistance to consultancy services for be determined. government to implement measures to preparation provided by privatize and commercialize public UNDP with Bank as enterprise sector. executing agency. Federal Ministry 100.9 Third Multi-State Agricultural Consultants would be Approved by the Executive of Agriculture, (IDA) Development - Phased financing of required for technical Directors on June 13, Water Resources agricultural development projects in assistance. 1989. and Rural four states. Total project cost Department estimated at about $150.0 million, of which about $100.0 million in foreign exchange. Government of 27.7 (R) Refinery Rehabilitation - Consultants would be Approved by the Executive Nigeria, Nigerian (Bank) Rehabilitation of support facilities required for engineering Directors on June 29, National such as waste water treatment, studies and technical 1989. Petroleum steam-condensate recovery, fire- assistance. Corporation water system etc; procurement of Procurement: Retroactive essential spare parts, computer for financing of up to US$2.6 management control, etc; and million for expenditures technical assistance in maintenance incurred after November 1. management, pollution control and 1988 approved. engineering studies for Warri and Kaduna refineries. - 30 - Member Country, Amount & Project" Consulting Services Stage of Processing a and Imylementing Probable Action on Procurement Agency Lender2 NIGERIA (Cont'd) Federal Ministry 21.0 (R) Oyo State Urban - Remove major Consulting services will Appraisal report of Works and (Bank) city wide infrastructure constraints be required to prepare completed. Negotiations Housing Oyo 29.0 (drainage, solid waste) with detailed designs and tentatively scheduled fo: State: Ministry (IDA) emphasis on rehabilitation and provide construction September. of Finance and maintenance in Ibadan and selected supervision. Economic Planning secondary towns. Strengthen Procurement: Retroactiv operational and management capacity financing of detailed at state and local levels; improve design studies and some planning and coordination of urban technical assistance is investments; and mobilize financial glanned. resources of state and local government levels. Total project cost now estimated at about $68.5 million, of which $53.9 million in foreign exchange. Ministry of 500.0 (R) Budget/Financial Policy - To To be determined. Appraisal mission Finance: Central (Bank) improve the operations of the tentatively scheduled foi Bank of Nigeria financial markets and enhance end August/September. resource mobilization and allocation. RWANDA Ministry of About Telecommunications - The project Consultants will be Appraisal report under Transportation 6.0 consists of: (a) reconstruction of required. review. and (IDA) postal and telecommunication Telecommunica- sectors, creation of commercially- tions oriented entities; (b) construction of a postal sorting center, improvement of mail in the rural areas: (c) implementation of comprehensive telecommunications maintenance program, and (d) installation of public telephones. Ministry of About (R) Transport Sector - To improve Consultants will be Appraisal mission in the Public Works 33.5 both internal and external required. field. (IDA) (international) transport. Would focus on Highway maintenance in the context of national public road program; also feeder road construction and maintenance. International transport policy issues would be addressed with a view to reduce costs. Ministry of About (R) PEN II - Expansion of existing Consultants may be Project under preparation Health 20.0 population policies and program. required. (IDA) Strengthening Minisaposo's capability to address most pressing needs about malaria, AIDS, diarhea diseases. Increase role of communes in delivery of health population services. Ministry of About (R) Education Sector - Strengthen Consultants may be Appraisal mission Primary and 69.0 primary and secondary education sub- required. scheduled for November. Secondary (IDA) sectors through rehabilitation of Education facilities. Improve teacher training and provide books and materials. - 31 - Member Country, Amount & Project' Consulting Services Stage of Processing and and Im?lementing Probable Action on Procurement4 Agency Lender2 RWANDA (Cont'd) Ministry of About Communal Development - To be determined. Project under preparation. Interior 32.3 Implementation to assist Government (IDA) with its decentralization policy, specifically focused on strengthening the commune's role in national development. Ministry of 19.9 (R) Agricultural Services II - Consultants will be Approved by the Executive Agriculture (IDA) Project would focus principally on required. Directors on May 30, 1989. the development of national agricultural services and structure. Ministry of 32.0 (R) Urban Institutions - Resource Consultants have been Approved by the Executive Public Works (IDA) mobilization with improvement in recruited for project Directors on June 15, local tax base strengthening of preparation. 1989. urban institutions; upgrading and land tenure improvements: employment and income generation. Total project cost estimated at $54.0 million. Government/ About Energy Sector - Works and equipment Consultants will be Project under preparation. Electrogaz 32.3 for rehabilitation of the medium required. (IDA) voltage transmission and distribution networks and new connections: low cost distribution pilot projectl assistance for planning, and institutional restructuring (Electrogaz). Assistance to create institutional structure and develop small-scale projects using methane gas. Total project estimated at $38.0 million. SAO TOME & PRINCIPE Ministry of 9.5 (R) Structural Adjustment II - Focus To be determined. Appraisal completed. Economy and (IDA) on macroeconomic stabilization and Finance structural adjustment measures started under the First Structural Adjustment Program. The proposed credit will support the strengthening of administrative capacity of government's key agencies; improvement in utilization of public sector resources; and stimulation of economic growth. Ministerio da 5.0 (R) Multi Sector/Priority Works - Consultants will be Approved by the Executive Economia e (IDA) Will comprise several sectors: required to assist in Directors on June 14, Finances infrastructure, health and project preparation and 1989. Credit signed July education. Objective is to assist for the organization of 19, 1989. the country with social costs of the social and adjustment. Will include large infrastructure fund component of priority works as well (SIF). as infrastructure rehabilitation (except roads), urban upgrading, rehabilitation of health posts, and essential drugs. Malaria eradication will also cover some priority projects in the education sector. - 32 - Member Country, Amount & Projects Consulting Services Stage of Processing a and Im lementing Probable Action on Procurement Agency Lender SENEGAL To be determined 20.0 (R) Irrigation Sector - To promote Consultants will be Project under preparatiox (IDA) private irrigation in the Fleuve required (estimated at Region and in peri-urban areas, for 200 staffweeks). export and domestic markets. Total project cost estimated at $30.0 million. Societe Nationale 60.0 Energy II - Expand transmission Consultants will be Project under preparation d'Electricite (IDA) system to Saint Louis and Kaolack to required. (Estimated at (SENELEC) optimize use of cost effective 100 staffweeks). generating units in Dakar and reduce the operating cost of the local generating plants while improving the supply of these regions. Continue the institutional support to SENELEC. Ministere du 20.0 (R) Environmental Management - Consultants will be Project under preparation Developpement (IDA) Promotion of policy changes required (estimated at (Co-financing expected Rural, Ministere conducive to more sustainable land 100 staffweeks). with CCCE and FAC de la Protection use throughout the country, and (France)). de la Nature, implementation of land use plans Ministere des with village and herder Ressources associations. Total project cost Animales -estimated at $30.0 million. Ministere du Plan 53.0 (R) SAL IV - Program.of macro Consultants will be Negotiations tentatively (IDA) reforms aimed at consolidating required. scheduled for January progress under previous SAL 1990. operations. Particular emphasis given to eliminating obstacles to private sector growth and to improving efficiency of public resource management and rationalizing para-public sector. To be determined 20.0 (R) Banking Financial Sector - To be determined. Appraisal mission (IDA) Restructuring program. Components tentatively scheduled for will include comprehensive banking September. sector, restructuring, reinforced supervision and debt recovery programs as well as reforms to the overall financial intermediation system. Ministry of Plan 20.0 (R) Public Works & Employment - The Consultants will be Negotiations under way. and Cooperation (IDA) purpose of the project is to help required. the Government implement an emergency employment program. Labor intensive public works will be one of the project's major components. - 33 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency Lender2 SENEGAL (Cont'd) Ministry of - 45.0 (R) Transport Sector Adjustment - Consultant firms have Appraisal mission Equipment (IDA) Road strengthening and maintenance carried out studies scheduled for October. program; technical assistance and needed to prepare, the (Co-financing being studies; track rehabilitation and, - highway, railway and identified). policy measures to enhance - aviation components and efficiency of Senegalese railways; conclusions have been Diagnostic and other studies and technical assistance to agreed with the studies in preparation of improve management and efficiency of Senegalese Delegation. various subsector aviation and maritime sub-sectorsi - - - components (i.e. highway, rehabilitation of port access in The report-on railways is railway, aviation and Dakar and of regional airport the basis- of the contract ports) have been financed runways. plan being established by under an IDA Project the consultants in - Preparation Facility collaboration with the advance of $1,500,000. cellule des contrats plans. Main policy framework covering highways and railways already agreed upon. Ministry of Rural 20.0 (R) Agriculture SECAL - Deepen Consultants will be Appraisal mission Development and (IDA) structural adjustment through - required (estimated at tentatively scheduled for SONACOS further reforms in pricing policy, 200 staffweeks). October. marketing and input distribution, - (Co-financing expected credit, natural resources management with CCCE for $18.5 and tenure, staff training and million). career development. Total project cost estimated at $50.0 million. - Ministry of Rural 20.0 Agricultural Extension - Promotion Consultants (estimated at Negotiations tentatively Development (IDA) of effective crop and livestock 100 staffweeks) will be scheduled for January extension services based on pilot required. - 1990. operations undertaken in 1988. Total project cost estimated at $30 million. Ministry of 50.0 Water Supply III/Sectoral Adjustment Feasibility studies are Appraisal mission Hydraulics (IDA) Credit (SECAL) - Sectoral policy completed. Consultants tentatively scheduled for reform and institution building to for detailed studies and February 1990. strengthen water supply and technical assistance will (Cofinancing will be sanitation sector management. be required after required). Financing physical works including appraisal. increasing capacity of water production systems; and rehabilitation and expansion of water distribution systems of Dakar and secondary centers; technical assistance training and studies. Total project cost estimated at $307.0 million. Ministere du 20.0 Human Resources Development Sector - Consultants would be Pre-appraisal mission Plan; Ministere (IDA) Project is tentatively expected to required for project tentatively scheduled for de la Sante, de comprise policy reforms and preparation and October. Co-financing 1'Education, investments in three parts: (a) to implementation. will be required for a Ministere du support implementation of a national total project cost of $10( Developpement population program; (b) to million with Special Social strengthen primary health care Program of Assistance services, including family planning; funds for project and (c) to improve primary education financing and for the and the adequation of technical policy reforms aspects. education to skill demand. -34- Member Country, Amount & Project3 Consulting Services Stage of Processing a and Im lementing Probable Action on Procurement Agency- Lender2 SENEGAL (Cont'd) Institut 18.5 (R) Agricultural Research II - Consultants will be Negotiations tentatively Senegalese de (IDA) Further strengthening of the required. (Estimated at scheduled for September Recherche Institut National de Recherche 100 staffweeks). 15. Agricole (ISRA) Agricole, implementation of priority (Co-financing expected research, and manpower training with FAC (France), and programs, strengthening of research USAID for $20.0 million and extension linkages. Total each. Another cofinancii project cost estimated at US$38.9 is also being sought). million. SIERRA LEONE National Power 7.0 Power Sector Rehabilitation - Assist Consultant services will Preparation under way. Authority (NPA) (IDA) NPA with rehabilitation of be required for project generation, subtransmission and management and technical distribution facilities in the assistance. Western area, and help establish the basis for NPA to become an autonomous and commercially viably utility. SOMALIA Ministry of 33.0 Infrastructure Rehabilitation - Consultants have been Pre-appraisal mission National Planning (IDA) Maintenance and rehabilitation of engaged for management scheduled for and Juba Valley highways, investments and reforms in and engineering September/October. Development Mogadishu and Rismayo Water preparation under an IDA Authorities, and minor investments PPF. and management improvements in Mogadishu and Kismayo municipalities. Ministry of 40.0 (R) Industrial Sector Adjustment Consultants will be Project being identified. Industry (IDA) (formerly Industrial Restructuring/ required for diagnostic Enterprise Development - Public studies, export Enterprise reform and development, industrial rehabilitation, export development finance. and support to industrial policy measures. Ministry of 10.0 Baardhere Resettlement - Consultants have been Project under preparation. National Planning (IDA) Resettlement of about.3,000 engaged for locating land and Juba Valley families, relocation of for resettlement. Development approximately 9,000 refugee families from reservoir area. Establish 2 forest reserves, salvage cultural property, implement wildlife management program, consulting services, surveys and mapping. - 35 - Member Country, Amount & Projecti Consulting Services Stage of Processing and and Im?lementing Probable Action on Procurement4 Agency Lender2 SOMALIA (Cont'd) Ministry of :25.0 (R) Population/Health - Development To be determined. Project being identified. Health (IDA) of rural health services in the context of a health sector plan, with emphasis on institutional, managerial and financial issues. Ministry of 27.0 (R) Primary Education - Support for To be determined. Appraisal completed. Education (IDA) primary education rehabilitation. Negotiations currently scheduled for January 1990. Ministry of About (R) Somalia Farahaane - Consultants will be Negotiations completed. Agriculture 27.8 Rehabilitation of an irrigation sub- required for engineering Board presentation (IDA) project (5,100 ha) including two supervision and scheduled for August 1, barrages and provision of buildings, institutional support. 1989. equipment etc. National Planning 62.0 Baardhere Dam - A multi-purpose dam Consultants will be Appraisal mission & Juba Valley (IDA) on Juba River that will provide required for engineering tentatively scheduled for Development hydropower for Mogadishu and Kismayo supervision and FY90.. (Cofinancing as well as irrigated agricultural institutional support. expected with KfW, EEC and development and flood protection. Italy). Ministry of 70.0 (R) Agricultural Sector Adjustment Consultants will be Approved by the Executive Finance (IDA) Program II - Support for policy required for technical Directors on June 1, 1989. reform and balance of payments. assistance. Credit signed on June 26, 1989. SUDAN Ministry of 25.0 Education IV - Assistance to gradual To be determined. Project under preparation. Education (IDA) expansion of primary education at the regional level. Support to instructional quality through curriculum development, teacher training, instructional equipment. Rehabilitation of deteriorated higher education libraries and laboratories. Improved management practices and resource utilization. Ministry of 75.0 Emergency Flood Reconstruction - To Consultants will be Approved by the Executive Finance & (IDA) provide support to the Government's required. Directors on May 4, 1989. Economic Planning Emergency Flood Reconstruction (Cofinancing expected fror Program in the agriculture, various donors). education, telecommunications, and urban sectors, to provide technical assistance to the National Reconstruction Implementation Unit. Sudan About (R) Telecommunications Sector Consultants will be Appraisal completed. Telecommunica- 22.0 Rehabilitation - With emphasis on required. Negotiations tentatively tions Public (IDA) strengthening sector management and scheduled for November. Corporation improving quality of service through: replacement of Khartoum North and Omdurman telephone exchanges and extension cable networks rehabilitation of domestic and international satellite earth stations; rehabilitation of training school; and procurement of spare parts. -36 - Member Country, Amount & Project3 Consulting Services Stage of Processing an and Imylementing Probable Action on Procurement4 Agency Lender2 SUDAN (Cont'd) Ministry of 60.0 Energy Mining - Priority projects in To' be determined. Project under preparation Energy and Mining (IDA) petroleum, power and mineral development. Bank of Sudan, About (R) Economic Recovery - To provide Consultants will be Negotiations will take Ministry of 100.0 support for the implementation of required. place after agreement witl Finance and (IDA) the Government's four-year the Bank and the Fund on Planning Salvation, Reform and Development comprehensive reform Program (1988/89 to 1990/91) and its program. Annual Action Program (1988/89). Involves restructuring macroeconomic and incentives policies and public sector rationalization. Ministry of 23.0 Forestry - Protection and management Consultants engaged under Appraisal completed. Agriculture (IDA) of existing woodlands, extension PPF manpower assessment Negotiations tentatively forestry, energy conservation study; institutional scheduled for September programs, institutional reorganization and 1989. (Cofinancing strengthening including forestry forestry planning. expected with DANIDA for education and research, and National Additional consultants $10.0 million: FINNIDA for Land & Water Use Policy and will be required for $9.0 million; NORAD $4.0 Planning. forestry planning and million and ODA $2.0 management, extension and million). energy assessment study. An IDA Project Preparation Facility advance for $1.25 million approved. Sea Ports 40.0 Ports III - To increase the capacity Consultants will be Project under preparation. Corporation (SPC) (IDA) through separate oil facility, required. technical assistance and equipment for more efficient, containerized cargo handling. Ministry of 30.0 Population and Health - Support for Consultants will be Follow-up preparation Health (IDA) development of national population required. pending fulfillment of program including MCH/FP activities; agreed actions by in the context of a medium-term government. health sector plan, review of institutional, managerial and Project Preparation financial issues and development of Facility advance approved strategy to address them including to finance preparatory rehabilitation of infrastructural activities. First draft facilities; support policy study for Health Plan completed in health sector financing strategy. December 1987. Roads and Bridges 83.0 (R) Khartoum-Port Sudan Road Consultants will be Negotiations completed. Public (IDA) Rehabilitation - Rehabilitation and required to supervise Board presentation to be Corporation reconstruction of deteriorated civil works and assist scheduled in the second sections of the road; implementation with axle load control quarter of FY90. of axle load control and pavement and pavement management. management systems. TANZANIA Tanzania Harbors About Ports Modernization - To assist To be determined. Appraisal mission in the Authority 30.0 Tanzania in optimizing port handling field. (IDA) capacity by rehabilitating/improving terminal facilities at Tanga and Dar-es-Salaam; increasing productivity and improving maintenance capability through technical assistance, and training and provision of spare parts for equipment rehabilitation. - 37 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im?lementing Probable Action on Procurement4 Agency Lender2 TANZANIA (Cont'd) Ministry of About (R) Tree Crop Rehabilitation - Consultants will be Approved by the Executive Agriculture & 25.1 Rehabilitating the tree crop required. Directors on June 27, Livestock (IDA) industry with emphasis on coconut 1989. and cashew. Ministry of About Petrol Rehabilitation - To improve To be determined. Appraisal report under Energy 30.0 the distribution of petroleum preparation. (IDA) products. Ministry of About Industrial and Financial To be determined. Project preparation under Finance 100.0 Restructuring - To support the way. (IDA) restructuring of industrial enterprises and financial intermediaries. Ministry of About Health and Nutrition - The project To be determined. Project preparation under Health 25.0 is to strengthen health services, way. (IDA) improve, monitor and support population policy. Ministry of About (R) Education Rehabilitation - To be determined. Appraisal report under Education 45.0 Support rehabilitation of secondary preparation. (IDA) education and quality of management. Ministry of About (R) Agricultural Adjustment - Consultant services will Appraisal mission in the Finance, Economic 158.6 Pricing and institutional reform in be required. field. Affairs and (IDA) agriculture. Planning Ministry of About (R) Roads I - Roads Rehabilitation Consulting services will Appraisal mission in the Transport 150.0 program. be required. field. (IDA) TOGO Ministry of 30.0 Structural Adjustment IV - To To be determined. Project preparation to Planning (IDA) further support Government's commence early FY90. structural adjustment process. Office des Postes 16.0 (R) Telecommunications - Consulting services Approved by the Executive et Telecommunica- (IDA) Rehabilitation and extension of required for Directors on June 29, tions (OPTT) telephone networks, Lome-Kara- institutional development 1989. Credit signed on Niantougou-Pya. Technical and project July 18, 1989. assistance and training for OPTT implementation. strengthening and development. Ministry of Plan 5.0 (R) Pre-Investment - Preparation of Consultants required for Approved by the Executive (IDA) a pipeline of projects within the investment feasibility Directors on May 12, 1989 framework of agreed investment studies, final project Credit signed on June 29, plans; sector analysis and training. execution plans and 1989. sector analysis. Ministry of Rural 7.0 (R) Agricultural Services Consulting services will Appraisal planned for Development (IDA) Rehabilitation - Rehabilitation of be required. October 1990. General Agricultural Support Services including input supply, seed production, applied research and cooperative development. -38i- Member Country, Amount & Projecti Consulting Services Stage of Processing a and Imylementing Probable Action on Procurement AgencY Lender2 TOGO (Cont'd) CEET (Compagnie 15.0 Power Rehabilitation - Rehabilita- Consultants required for Appraisal report under Energie (IDA) tion and extension of distribution institutional studies, preparation. Electrique du system in Lome; purchase of spares technical assistance and IDA Project Preparation Togo) and equipment; technical assistance training, and engineering Facility advance of and training at all levels to for rehabilitation and $750,000 has been approv improve all aspects of power extension of system. to finance CEET's operations. "diagnostic" study.- Ministry of 10.0 (R) Health Sector Adjustment - Carry Consultant services Project under preparatior Public Health and (IDA) out sector reforms to improve basic required for project Preparation mission Social Welfare & services, strengthen institutional preparation. scheduled for September t Women's Affairs management mobilization and use firm up reform action external resources to rehabilitate plan. existing facilities. Project to include quick disbursing components. Ministry of 5.0 (R) Grassroots Development Consultant services for Approved by the Executive Planning and (IDA) Initiatives - Program aims to training, project Directors on March 21, Mines provide financial support and evaluation and monitoring 1989. Credit signed on technical assistance to Non- will be required. July 18, 1989. Government Organizations (NGOs) working on micro, rural development projects; irrigation, health care, non-formal education. Ministry of 5.0 Technical Education and Skill Consultant's final report Appraisal mission Technical and (IDA) Training - To include: (a) sent to Government for scheduled for September. Professional strengthening of the strategic comments. Education formulation, programming and leadership functions of the NETFP, creation of information systems necessary for improved analysis of labor market introduction of linkages with employers; and (b) a fund to sponsor new or modified public and privately sponsored training programs of public and privately owned courses. Ministry of 15.0 Infrastructure Adjustment - To be determined. Project under preparation Equipment and (IDA) Incorporate earlier planned second by Government with the Posts & - phase of Lome water supply, as well help of consultants under Telecommunica- as urban and transport components PPF recently increased to tions and an infrastructure institutional US$750,000. framework. Appraisal mission scheduled for December. UGANDA Ministry of 64.0 (R) Infrastructure - Expansion of Consultants for project Pre-appraisal mission in Planning and (IDA) water supplies facilities in the preparation have been the field. Economic seven major towns, rehabilitation of appointed. .(Co-financing being Development essential urban services in Kampala sought). and strengthening of the responsible organizations. Total program is estimated at US$200 million. Ministry of 20.0 Education V - Action would support To be determined. Preparatory study of the Education (IDA) implementation of education policy education sector under commission recommendation. way. -39- Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agenc Lender2 UGANDA (Cont'd) Ministry of About (R) ARP II (Second Agricultural Consultants will be Appraisal mission in the Planning and 25.0 Rehabilitation) - Implementation of required. field. Economic (IDA) institutional and policy reforms to Development improve farm productivity and efficiency in processing and marketing and restructure relevant sectoral parastatals and strengthen agricultural research and extension institutions; finance agricultural inputs and selective investment in private and public sectors. Uganda Commercial 15.0 Rural Enterprises - Credit for Consultants will be Preparation under way. Bank (IDA) financing rural enterprises will required. Appraisal scheduled for focus on small and medium scale January 1990. borroversi technical assistance to operate business services, strenghten credit policy and business training. Uganda-Ministry 25.0 Livestock Services - To improve To be determined. Project under preparation. of Animal (IDA) animal disease control, veterinary Project being prepared by Industry and services, and to look into consulting firm. Fisheries restructuring of dairy processing and marketing. Electricity Board About (R) Power III - Project's main Consultants currently Project under preparation. 111.6 components are likely to consist of preparing proposals for (IDA) a hydroelectrical power station, feasibility study. (for which a feasibility study will shortly be performed) plus some rural electrification. Ministry of About Industrial Restructuring - Support To be determined. Project under preparation. Industry and 30.0 of industrial restructuring with a Technology (IDA) focus on public enterprise. Uganda Posts and 52.3 Telecommunications II - Continuation Consultants will be Credit approved by the Telecommunica- (IDA) of rehabilitation program in posts required for financial Executive Directors on tions Corporation and telecommunications sector. planning and management March 14, 1989. Signing Total project cost estimated at for institutional and date has not yet been $58.8 million. manpower development. scheduled. Engineering consultants have already prepared the physical components of the project, including tender documents. Ministry of 25.0 Health II - Follow up of Health I To be determined. Project under preparation. Health (IDA) project to further develop rural health services. ZAIRE Institut National About (N) Agricultural Research - Consultants for pre- Project under preparation. pour 1VEtudes et 20.0 Restructuring and development of the appraisal provided by de la Recherche (IDA) Institut National pour l'Etudes et FAO/CP. Consultants for Agricole de la Recherche Agricole; support to appraisal to be national agricultural research determined. master plan; investment support on research stations and training of research, technical and administrative personnel. - 40 - Member Country, Amount & Project3 Consulting Services Stage of Processing z and Imylementing Probable Action on Procurement Agency Lender2 ZAIRE (Cont'd) Ministry of Rural About (R) Pilot Extension - To rationalize Consultants are being Appraisal report under Development 8.0 agricultural extension services appointed by FAD. preparation. (IDA) through pilot operations. COMETAT; About (R) Education III - Education sector To be determined. Appraisal report under Enseignement 46.7 adjustment and support to essential preparation. Primaire et (IDA) programs in primary and secondary Secondaire education. Commissariat About (R) Social Sector Adjustment - To be determined. . . Appraisal-mission in-the d'Etat du Plan 105.3 Develop key social policies and field. (IDA) related institutional changes in the population/health/nutrition, education, employment, and women in development sectors. NGO/Government collaboration will be strengthened and a social dimension of adjustment survey implemented. Ministry of About Mining Sector Rehabilitation - The To be determined. Project under preparation Energy and Mines 58.2 proposed project would help restore (IDA) and further develop the non-copper mining sector in order to Improve Zaire's foreign exchange revenues and diversify its exports. Ministry of About Industrial Crops - Financing to Consultants have been Project under preparation Agriculture 107.5 tree-crops estate companies to recruited. (IDA) support their rehabilitation and assistance in developing small- holder production of tree-crops. Investment support component will provide assistance In training estate managers and technicians and in dealing with estate management problems. Societe About (R) Energy I - High priority items Consultants have been Project preparation under d'Electricite 160.0 of SNEL Investment Program including retained to assist in way. (SNEL), Ministry (IDA) building of the strategic stock of preparation. of Energy and spare parts; Moanda-Matadi petroleum Mines products pipeline; imports of petroleum products; and management assistance. Total project cost now estimated at $221.6 million. Department of 75.0 (R) Transport Rehabilitation I - Consultants have been Approved by the Executive Transportation; (IDA) Continuation of support for the appointed to help in Directors on May 30, 1989. ONATRA; SNCZ rehabilitation program of the rail preparation. Credit signed on June 30, and river transport (ONATRA) 1989. systems; technical assistance to management and track renewal and locomotives rehabilitation for the railways (SNCZ). Office des 105.8 Transport Sector - Rehabilitation To be determined. Project under preparation. Routes; and (IDA) and maintenance of main and feeder Ministry of Rural roads and key agricultural roads. Development Strengthening of sector institutuLons, training and possibly airport rehabilitation. Total project cost to be determined. - 41 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Imlementing Probable Action on Procurement4 Agency Lender2 ZAIRE (Cont'd) Office des About Urban I - First operation in the Consultants preparing Appraisal report under Voiries 38.0 sector, institution building, cost- urban component.with preparation. (IDA) recovery mechanism, technical financing from France and assistance, urban infrastructure, IDA. land development, land registration, housing finance, and urban services. Prime Minister's About (R) Public Finance/SAL II - Support To be determined. Project under preparation. Office 140.0 for the second phase of the (IDA) Government's structural adjustment program. GECAMINES 20.0 (R) Gecamines Technical Assistance Consultants will be Credit approved by the (IDA) II - Continue and extend technical required. Executive Directors on assistance program to GecamLnes to June 27, 1989 and signed help improve management. on July 13, 1989. ZAMBIA Ministry of About Dairy II - Provide assistance for To be determined. In reserve program. Bank Agriculture and 10.0 smallholder dairy development and and IDA operations are Water Development (IDA) technical assistance. suspended pending resolution of arrears. Ministry of About Agricultural Marketing and To be determined. In reserve program. Bank Agriculture and 50.0 Processing - Support investment and IDA operations are Water Development (IDA) policies, and institutional changes suspended pending to improve marketing, input resolution of arrears. distribution, and processing with a view to privatization. Bank of Zambia/ 103.5 Recovery Credit - To support Consultants will be In FY90 program. Bank and Ministry of (IDA) economic policy and institutional required. IDA operations are Finance reforms designed to bring about suspended pending structural change in the economy. resolution of arrears. Project would provide imported goods and services, particularly production inputs, needed to sustain the recovery and diversification effort. Ministry of About Family Health - Objectives are to Consultants will be In reserve program. Bank Health 20.0 improve primary health care required to prepare and IDA Operations are (IDA) services, expand family planning clinic designs and tender suspended pending activities, and introduce cost- documents, and help resolution of arrears. recovery in the health sector. design and install Total project cost estimated at $36 financial and procurement million. systems. Ministry of About Agricultural Credit - Development of Consultants will be In reserve program. Bank Agriculture and 27.1 agricultural financing institutions required. and IDA Operations are Water Development (IDA) and sound lending programs for a suspended pending wide range of beneficiaries, resolution of arrears. - 42 - Member Country, Amount & Projecti Consulting Services Stage of Processing ai and Imlementing Probable Action on Procurement Agency Lender2 ZAMBIA (Cont*d) Development Bank 10.0 DEZ III - Thir4 Line of Credit to Consultants will be Approved by the Executive of Zambia (DB2) (IDA) Development Bank of Zambia. To help required. Directors on January 6, DB2 improve its performance and its 1987. (Cofinancing agree ability to mobilize resources with EIB for $8 million). through a major capital increase; Bank and IDA Operations upgrade the quality of DB2's are suspended pending portfolio and increase the resolution of arrears. efficiency of financial and management decision-making by establishing a Management Information System and training DBZ staff in its use. Zambia About Mining Technical Assistance - To Consultants will be In reserve program. Bank Consolidated 18.5 finance: (a) specified technical and required. and IDA Operations are Copper Mines Ltd. (IDA) managerial personnel on a short-term suspended pending (ZCCM) basis; (b) consulting servicesi and resolution of arrears. (c) training to help strengthen ZCCM staffing and administration. Ministry of About Education VI - Promote policy agenda To be determined. In reserve program. Bank Education 42.0 for efficiency improvement, quality and IDA Operations are (IDA) in science, training, finance public suspended pending investment. resolution of arrears. Ministry of About Export Diversification - Project Consultants will be In reserve program. Bank Agriculture 30.0 will support measures to increase required. and IDA Operations are (IDA) production and export of suspended pending agricultural commodities; provide resolution of arrears. funding to technical assistance to assist market analysis and processing. ZIMBABWE Govt/National 20.0 Railway II - Improvements for Consultants will be Project preparation under Railway of (Bank) locomotives and rolling stock, required. way. (Co-financing will Zimbabwe (NRZ) management and operating information be required). systems. Ministry of About Manpower Development - Technical To be determined. Project slipped to reserve Labor, Manpower 14.0 education vocational training and program pending Government Development and (Bank) management training. consideration. The ocial Welfare project may need to be re- (MLMDSW) appraised. Ministry of Local 80.0 (R) Urban II - Preparing smaller To be determined. Approved by the Executive Government (Bank) towns for increased urbanization Directors an June 1, 1989. sector lending for urban infrastructure development program: strengthening urban and regional management capabilities. Agricultural 36.3 (R) Agriculture and Export Promotion Consultants will be Approved by the Executive Finance (Bank) - Onlending for crop diversification required. Directors on May 18, 1989. Corporation for exports and support to small farmers. - 43 - Member Country, Amount & Projecti Consulting Services Stage of Processing and and Im?lementing Probable Action on Procurement4 Agency Lender2 ZIMBABWE (Cont'd) Government/ About (R) Forestry II - Project objectives Consultants will be Negotiations originally Forestry 30.0 are afforestation, commercial required. scheduled for July have Commission (Bank) forestry development and institution been postponed until building. further notice. (Cofinancing of about $15.0 million will be required). Ministry of About (R) Power Sector III - Generating Consultants will be Project preparation Energy 85.0 capacity and other energy sector required. postponed pending an (Bank) issues. energy sector study. Appraisal mission tentatively scheduled for September 1990. (About $175.0 million in cofinancing being sought). WEST AFRICA REGION Banque Ouest 20.0 BOAD III - The project will consist Consultants will be Appraisal report under Africaine de (Bank) of a composite IDA/IBRD line of required to provide preparation. Developpement 30.0 credit for on-lending by BOAD to technical assistance in (BOAD) (IDA) viable sub-regional and national the preparation of investment projects. feasibility studies. -44- Member Country, Amount & Project3 Consulting Services Stage of Processing and Im?lementing Probable Action on Procuremei Agency Lender2 II. ASIA REGION BANGLADESH Bangladesh 70.0 (N) National Minor Irrigation To be determined. Appraisal mission Agricultural (IDA) Development - The project aims to scheduled for October. Development increase crop production by (Co-financing by ODA unt Corporation facilitating expansion of the area consideration). (BADC) served by minor irrigation equipment. It will support development of irrigation based on: (i) deep tubewell technology where development based on shallow tubewells and low lift pumps is not feasible; and (ii) low lift pump technology. The project will also support strengthening of the institutional and policy framework to help create confidence in the private sector and, thus encourage increased private investment. Bangladesh Power 80.0 Power Transmission and Distribution To be determined. Project preparation unde Development Board (IDA) II - The project would provide for way. (BPDB) extensions to BPDB's high voltage transmission system and extension and reinforcement of its distribution system. The details will be finalized on completion of system studies undertaken by BPDB and its consultants. Bangladesh Power 40.0 Second East/West Interconnector - Engineering design yet to Project preparation unde Development Board (IDA) Project would provide for the second be determined for project way. power transmission interconnection supervision. between East and West zones. The interconnection would be constructed on the Jamuna River and would be used to transmit electricity generated using indigenous gas in the East zone to the West zone to substitute for electricity generated using imported liquid fuel oil. Dhaka Water 100.0 Fourth Dhaka Water/Sanitation - Consultants have been Identification under way Supply and (IDA) Project includes: (a) development recruited for (Cofinancing of about Sewerage of long term water source for Dhaka predesign/design of US$150 million will be Authority (DWASA) (including ground and surface project components. required). water); (b) rehabilitation and extension of water distribution and sewerage systems; (c) extension of water and low-cost sanitation program; (iv) further institutional development of DWASA; (v) exploration of deep artesian aquifer; and (vi) promotion of regulation of water resources in the Dhaka area. Total Project cost estimated at $300.0 of which foreign exchange component will be $250.0 -45- Member Country, Amount & Projecti Consulting Services Stage of Processing and and Imlementing Probable Action on Procurement4 Agency Lender2 BANGLADESH (Cont'd) Ministry of 100.0 Population and Health IV - To To be determined. Project under preparation. Health and Family (IDA) continue support to GOB with regard Planning to family planning service delivery and maternal child health programs, and to assist GOB in formulating and implementing a population and health policy framework. Ministry of 30.0 (R) Technical and Vocational To be determined. Project under preparation. Education (IDA) Education - To increase both the internal and external efficiency of the existing formal vocational and technical education systems, and to promote the development of non- formal vocational education. The Bangladesh 133.6 (R) Third Flood Rehabilitation Consultants required to Credit approved by the Water Development (IDA) (Emergency) - The credit aims to verify damage assessments Executive Directors on Board (BWDB); the help restore priority infrastructure and assist in June 27, 1989 and signed Roads and damaged by flooding. implementation. on July 7, 1989. Highways Department (RHD); Procurement: The the Local Government of Bangladesh Government has proposed disbursement Division (LGD) of of US$6.0 million (or 4.5 the Ministry of percent of the total Local Government; credit) for advance Rural Development procurement and and Cooperatives; retroactive financing of the Education essential road, inland Division (ED) of water transport and the Ministry of telecommunication Education the rehabilitation work. This Bangladesh Inland financing would be for Water Transport expenditures incurred Authority after October 1, 1988. (BIWTA); and the Bangladesh Telegraph and Telephone Board (BTTB) Bangladesh Bank 40.0 Small Scale Industries IV - The To be determined. Project under preparation. (IDA) proposed project would comprise: (a) a line of credit to assist investments in small scale industries to be channeled through private and nationalized commercial banks; and (b) a technical assistance component to improve service provision to small scale industries. It may also include a policy component to remove policy constraints on small scale industry development. Rural 90.0 (R) Rural Electrification III - Previously engaged Pre-appraisal mission Electrification (IDA) Finance the extension of the rural consultants under USAID tentatively scheduled for Board electrification program to new areas financing expected to September. and the associated technical continue. assistance and training. -46- Member Country, Amount & Projecti Consulting Services Stage of Processing a and Im?lementing Probable Action on Procuremen Agency Lender2 BANGLADESH (Cont'd) Chittagong Water 50.0 (R) Chittagong Water Supply/ Consultants have been Project is being Supply & Sewerage (IDA) Sanitation - Objectives are to recruited for preparation identified and prepared Authority (CWSSA) assist CWSSA to become a more activities. Design for appraisal which is efficient and effective institution consultants to be expected in early 1990. through rehabilitation/optimization recruited prior to of existing facilities and improved appraisal. technical, financial, managerial and administrative capabilities. Project likely to include program to reduce unaccounted for water, expansion of water supply facilities, rehabilitation of water distribution system, installation of sewerage/sanitation facilities, technical assistance and training. Total project cost is estimated to be US$60.0 million. Bangladesh Inland 40.0 (R) Inland Waterways & Transport III Consultants financed Project preparation is Waterways - (IDA) - To provide technical assistance, under UNDP, United States under way. Pre-appraisa: Transport training and equipment to upgrade Trade & Development mission in the field. Authority the capability of BIWTA and BIWTC. Program, UK and (BIWTA); The project would include: (a) Netherlands Trust Funds Bangladesh Inland streamlining, rehabilitation and are presently engaged in Water Transport replacement of inland fleets; (b) project preparation. Corporation improving waterway dredging and (BIWTC) survey capability; (c) improving navigational aids and vessel safety; and (d) institutional development. Ministry of 80.0 (R) Fisheries Sector - To assist To be determined. Appraisal mission Fisheries & (IDA) Government in large-scale scheduled for October. Livestock development of culture-based (Co-financing by ODA and fisheries in flood plain areas to UNDP possible). increase inland fish production and general economic activity. Components include hatchery - development, extension improvement, credit to individuals and fishermen groups, infrastructure development and strengthening of the Department of Fisheries. Bangladesh Water 50.0 BWDB Small Schemes II - Construction To be determined. Project under preparatioz Development Board (IDA) of flood protection facilities to by consultants. Scope at (BWDB) reduce crop losses due to floods and processing schedule undei provision of improved drainage and discussion. irrigation facilities to increase the area under high yielding crop varieties. The number of small schemes to be covered by the project will be determined during further project preparation. Bangladesh Bank 60.0 (R) Agricultural Credit II - To Consultants would be Pre-appraisal mission in (IDA) support further reform of required to assist in the field. agricultural credit system, technical assistance. (Cofinancing by ADB, and strengthen agricultural financial USAID agreed; and by OECI institutions and to provide credit possible). for agricultural investments. -47- Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency Lender2 BANGLADESH (Cont'd) Bangladesh Bank 50.0 Industrial Investment - Provision of ADB-executed UNDP Project dependent on (IDA) term financing to private sector technical assistance implementation of industry through private financial being undertaken as part Financial Sector Credit institutions to be selected. of project preparation. (FY90) and on UNDP Technical Assistance.- (Cofinancing with AsDB possible). Bangladesh Water 80.0 (R) Cyclone Protection - To provide Consultants would be Project dropped from the Development (IDA) assistance to establish infra- required for lending program. Further Board; Roads and structure to reduce the loss of life implementation. reporting will be Highways and property due to cyclones. Pro- discontinued. Department; and ject will provide for coastal Local Government embankments, feeder roads, and tech- Engineering nical assistance. Bureau Ministry of 110.0 Public Resource Management - To To be determined Recently completed CESW Finance (IDA) assist in resource mobilization and studies will be basis for use. To cover reforms and IDA credit preparation. institutional development in public Pre-appraisal mission revenue mobilization through scheduled for September. taxation and public pricing policies; public expenditure planning and implementation; and public enterprise reforms. Bangladesh Water 50.0 (R) BWDB System Rehabilitation - To Consultant services Appraisal report under Development (IDA) rehabilitate and improve existing required for: (a) preparation. Board (BWDB) water sector projects to fully planning, design'and (EEC and the Netherlands utilize production potential of construction monitoring likely to co-finance the lands served, and to ensure adequate of rehabilitation work; project). system for continued operation and (b) support services for maintenance of the schemes. Project operation and Procurement: About US$1 involves resectioning of maintenance; (c) on-farm million for equipment and embankments, repairs to drainage development; and (d) vehicles under ICB. structures, improvement of staff training. irrigation system, staff training and institutional strengthening. Finance Division, 175.0 Financial Sector - To promote Consulting services will Project preparation under Ministry of (IDA) financial policy reforms, especially be required to assist the way. Post-appraisal Finance interest rates, monetary instruments banks and Bangladesh mission scheduled for and treatment of subsidies; measures Bank. August. to strengthen credit discipline and improve debt recovery; and institutional and financial restructuring of nationalized commercial banks. Bangladesh Oil, 70.0 (R) LPG Recovery and Distribution - Consulting services will LPG feasibility study Gas & Mineral (IDA) To promote the substitution of LPG be required in under way. Pre-appraisal Corporation/ for kerosene and firewood, resulting environmental and and appraisal missions Bangladesh in foreign exchange savings; install operational safety and have been scheduled for Petroleum LPG recovery, transport and distri- LPG and stoves marketing. August and November. Corporation bution facilities; develop institu- tional framework for operation of facilities; develop policy for pricing of LPG at various stages of production and distribution; opti- mize role of private investors. - 48 - Member Country, Amount & Projecti Consulting Services Stage of Processing a and Imnlementing Probable Action on Procurement Avency Lender2 BANGLADESH (Cont'd) Ministry of 130.0 (R) General Education - To support Consultant services Appraisal report under: Education (IDA) continuation of GOB's primary financed by bilateral preparation. education program and extend it to grants will be required (Cofinanciers: ADB, secondary education. for school, text books, Netherlands, ODA, SIDA, curriculum, examination UNDP, UNFPA). strengthening and institutional development. Bangladesh Oil, 14.0 Petroleum Technical Development - To Consultancy services will Negotiations tentatively Gas and Minerals (IDA) provide equipment, training and be required for technical scheduled for January Corporation technical advisors to upgrade assistance and training 1990. BOGMC's gas appraisal/development, components to be financed operational efficiency (e.g., through bilateral grants. seismic acquisition and process- ing, geochemical analysis, reser- voir engineering, accounting) and planning capabilities. To be determined 60.0 Poverty Alleviation - To support the Consultant services will Appraisal mission (IDA) creation of non-government be required for technical tentatively scheduled for development finance company for assistance to be financed September. credit to both NGO and government through bilateral grants. programs for the poor and a Social Development Fund for human resource development. Jamuna Multi- 100.0 Bridge Construction - Construction Consultants for project Project preparation under purpose Bridge (IDA) of a major multi-purpose (road-rail- preparation are financed way. (Cofinancing interest Authority energy telecommunications) bridge by UNDP and have been re- has been expressed by ADB, across the Jamuna (Brahmaputra) cruited. Consultants will Japan and UK). River to reduce transport costs and be required for project support the Northwest's economic management and civil Procurement: Civil works integration with the rest of the works supervision. components to be financed country. Total project cost by IDA, and cofinanciers estimated at $560.0 million, of prequalification process- which $471.0 million in foreign ing of contractors began exchange. on October 31, and closed on January 31, 1989. Ministry of 120.0 Industrial Sector II - The credit Consultants may be Project preparation under Planning (IDA) would support GOB's further required for tariff way. liberalization of quantitative restructuring. restrictions on Imports, rationalize the structure of tariff rates, and streamline the investment sanctioning procedure and measures to increase autonomy of public enterprises. Bangladesh Power 80.0 Power Distribution and To be determined Appraisal mission Development Board (IDA) Rehabilitation - Implementation of tentatively scheduled for loss reduction program and expansion September. of local distribution system at Khulna and in 9 towns as well as provision of spare parts for rehabilitation of thermal plants. - 49 - Member Country, Amount & Projecti Consulting Services Stage of Processing and and Imlementing Probable Action on Procurement4 Agency Lender2 BANGLADESH (Cont'd) BOGMC 110.0 (R) Gas Infrastructure - (a) Experts on LPG recovery Identification mission (IDA) Ashuganj LPG Plant; (b) integration "processes gas network tentatively scheduled for of gas grid (Bakhrabad-Ashuganj analysis and pipeline October. pipeline); (c) grid control and engineering environmental operations safety systems; (d) safety and compressed . further appraisal drilling; and (e) natural gas are required. technical assistance in pipeline management and compressed natural gas development. To be determined 120.0 (R) Public Enterprise I - Project To be determined. Project dropped from the (IDA) will include policy conditionality Lending Program. Further relating to public industrial reporting will be enterprises generally, with a more discontinued. detailed set of policy and organizational changes for one to- be-selected industrial public enterprise group. CHINA Ministry of 300.0 (N) Irrigated Agriculture To be determined. Preparation mission Agriculture and (Bank)/ Intensification - To support a broad scheduled for August. Ministry of Water (IDA) program of irrigation and drainage Resources improvements, crop varietal improvements, intensification of agricultural input supplies, and intensified agricultural services across the North China Plain. Xinjiang 120.0 (N) Tarim Basin Irrigation - To be determined. Preparation mission Autonomous Region (IDA) Systematic upgrading of 120,000 ha scheduled for September. of oasis irrigation in the Tarim Basin of Xinjiang, and reclamation and irrigation of 120,000 ha of desert wasteland facilitated by water savings in existing systems, for production of cotton, wheat, fodder, fruit, vegetables, oil seeds and timber. Ministry of 100.0 (R) Fertilizer Machinery - Upgrading Consultants may be needed Identification under way. Machinery and (Bank) and restructuring of domestic for project preparation. Electronics fertilizer machinery enterprises to Industry enable them to produce equipment for the manufacture of high grade fertilizers. Beijing Municipal 100.0 (R) Beijing Environment - Physical Specialist in municipal Preparation under way. Environmental (Bank/ works and institutional and industrial wastewater Protection Bureau IDA) strengthening to address air and treatment, solidwaste water pollution problems in Beijing management and district city arising from industrial and heating would be domestic wastewater discharges, required. disposal, solid and toxic wastes, and burning of low grade coal. Ministry of 30.0 Technical Cooperation Credit III - Consultants will be Negotiations completed. Finance (IDA) Line of credit for preparation of required during Documents circulated to investment projects. implementation of the Executive Directors on subprojects for project June 8, 1989. Date of preparation activities. Board discussions to be determined. -50- Member Country, Amount & Project3 Consulting Services Stage of Processing 4 and Im lementing Probable Action on Procuremei Agency Lender2 CHINA (Cont'd) Changchun 85.0 (R) Changchun Water Supply - To Expatriate consultants Preparation under way. Municipal (IDA) provide water supply to relieve required for project Planning serious shortages, and to plan for preparation. Commission appropriate disposal of waste water. Henan Provincial 90.0 (R) Henan Agricultural Development - To be determined. Identification mission Planning & (IDA) To develop/improve 380,000ha completed. Preparation Economic irrigation area with surface and under way. Commission groundwater in Henan's Yellow River plain, alleviate salinization through improved drainage and irrigation, expand livestock, freshwater fisheries and forestry production, and provide agroprocessing facilities. Yellow River 350.0 Yellow River Basin - To construct To be determined. Identification under way Conservancy (Bank/ major dam (Xiaolangdi) on Yellow Commission IDA) River to provide protection from catastrophic floods for North China Plain, alleviate siltation and aggradation of river channel, provide irrigation water to over one million ha. of farmland, provide municipal and industrial water throughout the region, and generate electric power. Tianjin 100.0 (R) Tianjin Light Industry II - Consultants required to Preparation under way. Municipality and (Bank) Assistance to the municipal help prepare sub-sector China Investment government in the implementation of development plans. Bank its overall industrial strategy Proposals are being including subsector and evaluated. restructuring plans in a selected number of industries together with associated institution building. Shanghai 150.0 (R) Shanghai Industrial Efficiency - Consultants required to Identification under way Municipal (Bank) Assistance to the municipal help prepare sub-sector Government government in the implementation of development plans. its overall industrial strategy Invitations will be including subsector and issued shortly. restructuring plans in a selected number of industries together with associated institution building. Zhejiang Province 240.0 (R) Zhejiang Provincial Transport - To be determined. Identification mission ft Communications (Bank) Provincial transport, including highway component Depaitment Hangzhou-Ningbo Highway and possibly completed. Railway Jinhua-Wenzhou Railway. component has been droppE from the project. Preparation under way. Hebei Provincial 150.0 (R) Hebei Agricultural Development - To be determined. Preparation under way. Government (IDA) Multi-component project with major activities focused on improvements in crop and aquaculture production: research, extension, drainage and irrigation, harvesting, processing and marketing infrastructure. - 51 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Imylementing Probable Action on Procurement4 Agency Lender2 CHINA (Cont'd) Ministry of 150.0 (R) Forestry Sector I - To initiate Consultants' services Preparation under way. Forestry (IDA) a sectoral approach to lending for will be required for: (1) afforestation and other forestry management and activities, commencing in a large organization; (2) number of southern provinces. financial and economic analysis; (3) wood markets and utilization; (4) research on commercial timber production;.(5) afforestation. Short- term consultants financed by UNDP will be hired to assist in project preparation scheduled for August. Guangdong 160.0 (R) Guangdong Agriculture To be determined. Preparation under way. Provincial (Bank/ Development - Includes development Government/ IDA) of marine fishing within 200 mile Guangzhou Extended Economic Zone, coastal Municipal mariculture, coastal land Government reclamation, export fruit and livestock development. Agricultural Bank 250.0 (R) Rural Credit IV - To continue To be determined. Preparation under way. of China (IDA) the commercialization process within the Agricultural Bank of China and associated Rural Credit Cooperatives. Credit programs would be developed in six provinces, and Beijing municipality. To be determined 100.0 (R) Yunnan Provincial Chemical To be determined. Project dropped from the (Bank) Sector Development - Three Lending Program. Further components including: (a) provincial reporting will be chemical sector strategy; (b) line discontinued. of credit; and (c) institutional development. Ministry of 300.0 (R) Zouxian Thermal Power - Proposals have been Preparation under way. Energy (Bank) Construction of two generating units invited from short-listed of 600 MW each and associated firms to: (a) review transmission lines and substations, tender documents and technical assistance. specifications; (b) assistance with bid evaluation (c) assistance in interfacing of engineering and design for different islands; and (d) provide construction management support. Ministry of 200.0 (R) Shuikou Hydro Power II - Second Consultant advisory Pre-appraisal mission Energy (Bank) phase construction of dam and power- services will be tentatively scheduled foi house. required. late 1989. Shanghai 58.0 (R) Shanghai Metropolitan Transport Consultant services Preparation under way. Municipal (IDA) - Urban transport project in required for some Government metropolitan area of Shanghai to feasibility studies and relieve key bottlenecks and improve to prepare detailed transport system. engineering and bid documents. - 52- Member Country, Amount & Project Consulting Services Stage of Processing ano and Imlementing Probable Action on Procurement Agency Lender2 CHINA (Cont'd) Liaoning 65.0 (R) Liaoning Urban - First stage of Consultants have been Preparation under way. Provincial (Bank) program to improve urban conditions engaged to assist in Government/ in cities in Liaoning; consists of project preparation. Municipal physical and institutional Governments of strengthening work for water supply Shenyang, Yingkou in the cities of Shenyang, Yingkou and Fuxin and Fuxin and works to improve urban transport in the city of Shenyang. Tianjin Municipal 100.0 (R) Tianjin Urban - To improve Consultants required for Identification completed. Government (Bank/ municipal planning, sewerage and project preparation. Preparation under way. IDA) urban transport in Tianjin city. Shanghai 100.0 Shanghai Sewerage II - Continuing Consultants required for Some pre-feasibility work Municipal (Bank/ program to improve sewerage and project preparation. completed. Government IDA) environmental pollution control in the city of Shanghai. State Admin- 75.0 (R) Cement - To establish a new Consultants required for Post appraisal mission istration for (Bank) high-strength cement plant based on engineering design. tentatively scheduled for Building regional cooperation in the Shanghai October. Materials Economic Region; rehabilitate an Industry existing cement plant and provide Procurement: Technical technical assistance for design and specifications for tender research capabilities of local documents of all packages cement-related institutes. are under preparation. Retroactive financing being considered. Ministry of 110.0 Highways V - Shandong Provincial Consultant services Approved by the Executive Communications/ (Bank/ Highway. Construction of class one required for supervision Directors on May 25, 1989. Shandong Province IDA) Jinan-Qingdao road in Shandong; of construction. Transport assistance for highway planning and Department operations. Ministry of 180.0 Yanshi Power - Assist in Consultants are already Documents circulated to Energy (Bank) construction of 2x300MW coal-fired in place. the Executive Directors on thermal power units located at May 25. Date of Board Yanshi in the vicinity of coal mines discussion to be in Henan province. determined. Procurement: Advance procurement is in process for steam turbine generators and boilers for two 300mw coal fired generating units. Hainan Electric 67.0 (R) Daguangba Multipurpose - Provide Detailed engineering is Negotiations tentatively Power Company (Bank) power, irrigation and improved water being carried out by scheduled for late 1989. supply to economically backward Central South China southwest area of Hainan Island. In Investigation and Design Advance Procurement: addition, technical assistance and Institute with local Expected for urgently training will be provided. consultant assistance. needed materials (steel, Consulting services for cement and timber) and technical assistance consultancy services. will be required. Retroactive financing of up to US$6.7 million would be required. - 53 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency Lender2 CHINA (Cont'd) Tianjin 154.0 Tianjin Light Industry - Support the Consulting services will Approved by the Executive Municipality (Bank) development of selected subsectors be required for manage- Directors on February 21, in light industry through the ment and systems study, 1989. provision of technical and financial paper subsector study,- assistance. and preparation of over- Retroactive financing will all industrial strategy be required of up to $8.0 for Tianjin. million for procurement of some urgently needed equipment by enterprises and support institutions and recruitment of consultants to prepare machinery specifications. State Education 50.0 Vocational and Technical Education - Consulting services will Negotiations completed. Commission (IDA) Assist Government in expanding and be required for technical Documents circulated to improving secondary technical assistance for research the Executive Directors on education, technical teacher and development centers. May 24, 1989. Date of training systems, and establish Board discussions to be research and development centers. determined. Zhejiang Province 117.0 Zhejiang Multi-Cities - Provision of Consultants will be Project preparation by (IDA) urban services, in particular water required for project provincial government and waste-water treatment, reduce preparation and technical under way. environmental pollution, implement assistance. new land development schemes at city level, improve public transport and traffic management in Hangzhou, improve institutional strength and financial performance in urban services. State Science and 110.0 (R) Rural Industrial Technology Consulting services will Negotiations tentatively Technology (IDA) (Spark) - Support for program which be required for scheduled for late 1989. Commission (SSTC) seeks to promote rural industrial- vocational training ization through development and methods and design of Government has requested diffusion of packages of appropriate technology information retroactive financing for technology, training, and finan- databases and delivery a portion of the cost of cial assistance for rural enter- systems. sub-projects to be prises. implemented by small industrial enterprises. Ertan 300.0 (R) Ertan Hydro Power - Construction Consultants for assist- Preparation under way. Hydroelectric (Bank) of a 240 m. high dam with 3300 MW ance on procurement have Development Corp power station, a log conveyance been appointed. Procurement for civil (EHDC) system, resettlement of 29,000 Consulting services for works has started. people, and an environmental science electromechanical station. The principal objectives equipment, construction of the project are to alleviate the management and system severe power shortage in Sichuan studies will be required. Province and to promote institutional/financial development of EHDC and of Sichuan Province Electric Power Bureau. Inner Mongolia 150.0 Inner Mongolia Railway - Consists of Consultants not required. Approved by the Executive Local Railway (Bank/ 942 km. single-track railway between Directors on May 12, 1989 Corporation - IDA) Jining and Tongliao to transport Hohhot, Inner coal and to provide improved Mongolia transport for agricultural development in the region traversed. -54- Member Country, Amount & Project3 Consulting Services Stage of Processing ax and Imylementing Probable Action on Procuremeni Agency Lender2 CHINA (Cont'd) Xiamen Port 36.0 Kiamen Port - Includes construction Consultants selected for Approved by the Executive Bureau (Bank) of new berths, procurement of preparation of bidding Directors on December 13, equipment, staff training, and documents. Consultants 1988. preparation of master plan. needed for construction supervision. Ministry of 52.0 Integrated Regional Health Services Mainly local specialists Approved by the Executive Public Health (IDA) Development - Development and required but expatriate Directors on May 2, 1989. implementation of regional health consultants will be development programs for 3 medium- required for smoking Retroactive financing of sized city regions, including control and health eligible expenditures selected sectoral policy reforms in education. approved from January 1, management, financing and planning 1989. to improve efficiency, affordability and quality of health services; development of emergency care systems in selected urban centers; operational research on chronic disease. Municipal . 160.0 Medium-Size Cities Integrated Consultants will be Negotiations completed. Governments of (Bank/ Development - Consists of the design required for project Documents circulated to Changzhou, IDA) and implementation of a planning implementation, technical the Executive Directors c Luoyong and system and the financing of urban assistance and training. June 6. Date of Board Shashi infrastructure works designed to discussion to be improve urban planning capability, determined. implementation coordination and cost recovery across subsectors. Retroactive financing for $900,000 for eligible expenditures approved fro May 1. 1989. State Education. 120.0 (R) Key Studies Development - To Consultants are likely to Preparation under way. Commission (Bank/ support about 130 state key be required for technical IDA) laboratories in key universities and assistance and training. research institutes under the China Academy of Sciences in science and technology which are important to China's development during the Eighth Five-Year Plan period (1991-95). Shandong 109.0 Shandong Agricultural Development - Consultant services will Approved by the Executive Provincial (IDA) Includes integrated program of water be required for Directors on May 16, 1989 Government resource and agricultural monitoring and evaluation development for Tuhai River Basin, and feasibility itudies Procurement: The Shandon coastal development subprojects for agro-processing Government has requested based on aquaculture, and plants. retroactive financing mountainous area livestock amounting to US$10.0 development. million to cover costs fo civil works, buildings an materials, incurred since October 1. 1988. Ministry of Water 106.0 Shaanxi Provincial Agricultural 22 man months of Approved by the Executive Resources and (IDA) Development - Includes extension of consultancy services for Directors on March 28, Electric existing pumping schemes to 123,000 pumped irrigation systems 1989. Power/Shaanxi ha of land, provision of safe and for agricultural and Province . , drinking water to 180,000 people and livestock development. Government animal husbandry, aquaculture, seeds and agro-processing components. - 55 - Member Country, Amount & Projecti Consulting Services Stage of Processing and and ImTlementing Probable Action on Procurement4 Agency Lender2 CHINA (Cont'd) Ministry of 63.5 (R) Mid-Yangtze Agricultural Short term technical Appraisal report under Agriculture (MOA) (IDA) Development - To finance research, assistance in virus preparation. extension and training, and a indexing programs, post- planting program for fruit crops, as harvest and orchard Government has requested well as infrastructure and marketing management would be retroactive financing for development for those crops, in required. US$5.6 million to cover Sichuan and Hubei Provinces. costs of land development, civil works, training and equipment. Jiangsu Province 100.0 Jiangsu Provincial Industry - Consultants have been Project preparation under (Bank) Support development of provincial hired to assist in way. chemical industry, including technology associated institution building. identification. Consultants will also be required for technical assistance and training, during implementation. Shanghai 150.0 Shanghai Industrial Development - To Two consulting companies Negotiations completed. Municipal Finance (Bank) help provincial government with prepared sub-sector Board documents circulated Bureau preparation and implementation of development plans. The to the Executive Directors its overall industrial strategy same firms will be used on June 18. Date of Board including subsector development during project discussion to be plans in a selected number of implementation to provide determined. electronic, optical, electrical and management assistance to printing and packaging industries the subsectors under the The Shangahi Municipal together with associated institution project. Government has requested building. retroactive financing for 35.0 million to cover costs incurred after March 15, 1989, for consultancy services, travel abroad and for.acquiring foreign technology. China Investment 300.0 Industrial Finance V - The loan No consultants required. Approved by the Executive Bank (CIB) (Bank) would be onlent to industrial Directors on May 30, 1989. enterprises. Technical assistance and training to further strengthen CIB anticipated. Jiangxi 60.0 Jiangxi Agriculture Development - To Short term technical Documents circulated to Provincial (IDA) initiate a comprehensive program of assistance in livestock, the Executive Directors on Planning fisheries, livestock (including fisheries, forestry, tea May'22. Date of Board Commission waterfowl), forestry, and agro- and management will be discussion to be industry development, for both required. determined. export and domestic markets, in Jiangxi Province. The Jiangxi Government has requested retroactive financing for US$3.0 million to cover costs of on-farm works, pond construction. breeding livestock and feed procurement incurred since February 1. 1989. Ministry of 350.0 (R) Finance I - Loan for development To be determined Preparation under way. Finance (Bank)/ of two major financial institutions (IDA) (Bank of Communications and Construction Bank of China); support of overall financial sector development reform and possibly technical assistance to the People's Bank of China and the Ministry of Finance. - 56 - Member Country, Amount & Project3 Consulting Services Stage of Processing ai and Imlementing Probable Action on Procuremeni Agency Lender2 I CHINA (Cont'd) Ministry of 137.0 Hubei Phosphate - Development of Consultant services Approved by the Executive Chemical Industry (Bank) Dayuku/Huangmailing phosphate mining required to provide Directors on May 23, 1989 plant and associated technical assistance in ICB assistance. contract document Retroactive financing vil preparation and be recuired for up to $2. engineering studies. million for eligible expenditures for downpayment for engineering contracts and technical services and international travel. Ministry of 200.0 Railway V - To finance the To be determined. Preparation under way. Railways (Bank) Ministry's line increase capacity program of investments within which investments may be eligible for Bank financing according to a set of defined criteria to be agreed upon between the Ministry and the Bank. To conduct one or more sector studies, including a systemwide railway investment study aimed at increasing productivity of existing railway assets. Jiangsu 150.0 Jiangsu Provincial Transport - To Consultant services Documents circulated to Provincial (Bank/ rehabilitate canal and road network required for construction the Executive Directors or Communications IDA) in Jiangsu Province; to build supervision. June 9. Date of Board Department bridges and ship locks; to carry out discussion to be a Transport Corridor Study; to determined. develop transport construction units; and technical assistance for Retroactive financing of transport planning, budgeting and about US$10.0 million is design work. proposed. FIJI Ministry of 8.0 Education & Training - Improvement To be determined. Identification mission Education (Bank) and expansion of technical and scheduled for September. vocational training. Post and 8.1 Telecommunications III - To assist Consultants have been Approved by the Executive Telecommuni- (Bank) Government of Fiji to restructure hired. Directors on May 25, 1989. cations the telecommunications sector. Department Total project cost about $45.0 (P & T) million. - 57 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im?lementing Probable Action on Procurement4 Agency Lender FIJI (Cont'd) Ministry of 16.4 (R) Housing - To help the Fiji Consultants will be Negotiations scheduled for Housing and Urban (Bank) Government provide affordable required during July 19. Development housing to low income families. The implementation of Procurement of technical (MBUD) and Fiji project would (a) finance about technical assistance for assistance financed by Housing Authority 5,000 FA plots and houses; (b) set - institutional grants from Japan (1.2 (FHA) FA on a sounder financial and improvements and policy million) and UNDP (0.3 technical footing; (c) restructure development. million) under way. the rental housing program (d) (Other cofinancing enhance coordination between FEA and probable with ADB). relevant agencies; and (e) improve housing policy and institutional Procurement: Government performance through provision of has requested retroactive technical assistance to MHUD, the financing of $1.6 million Town and Country Planning Department for civil works and and the Native Land Trust Board. mortgage loan disbursements. INDIA To be determined About (R) Inland Fisheries II - To provide To be determined. Preparation mission 200.0 support services, credit and (FAO/CP and Bank) (Bank) / training and technical assistance scheduled for November. (IDA) for the development of brackish water shrimp ponds, fresh water fish in ponds and reservoirs in the States of West Bengal, Tamil Nadu, Kerala, Andhra Pradesh and Orissa. Government of About20 (R) National Dam Safety - To To be determined. Identification mission in India 0 strengthen government's procedures the field. (Bank)/ in dam safety assurance project, to (IDA) train staff and provide improved facilities and equipment; to support an assessment of dams selected by government; to help fund rehabilitation/modification works on dams. To be determined About (R) Nabard II - Support for To be determined. Identification mission in 300.0 Agriculture Credit. The project the field. (Bank) would supplement GOI resources for agriculture lending. Project objectives would include identification and implementation of appropriate reforms now required to revitalize agriculture lending and to make it more sustainable and effective. Department of 250.0 Industrial Pollution Control - To be determined. Preparation mission Chemical & (Bank) Support: (a) pollution abatement scheduled for August. Petrochemical; equipment at chemical plants; (b) Department of training of technical personnel; and Refineries at (c) installation of environmental Ministry of monitoring network. Industry; and Ministry of Environment Power Finance 200.0 (R) Power Finance Corporation - To be determined. Identification mission in Corporation (Bank) Financial support to the Power the field. Finance Corporation (PFC) which will serve as a financial intermediary in the power subsector primarily for the State Electricity Boards (SEBs). - 58 - Member Country, Amount & Project3 Consulting Services Stage of Processing an and Implementing Probable Action on Procurement Agency^ Lender2 INDIA (Cont'd) Departments of 150.0 (R) Seventh Population (Second No expatriate consultants Preparation mission Health & Family (IDA) Training) - Project will support required. scheduled for July/August. Welfare, States development of state apex training of Panjab, and research institutes, Haryana, Gujarat, strengthening of training and Bihar infrastructure and staff, and curriculum development for pre and in-service training of all family welfare staff in the States of Punjab, Haryana, Gujarat and Bihar. Total project cost about $210.0 million. Government of 100.0 Karnataka Urban Development - Local consultants will be Pre-appraisal mission Karnataka: (IDA) Project would cover ten largest required for project scheduled for mid-August. Housing & Urban 50.0 urban areas of state and include preparation. Development (Bank) institutional, shelter, transport Department; and traffic management, and water Banglalore and sanitation components. Total Metropolitan project cost about $350.0 million. Regional Development Authority Departments of 90.0 Third Nutrition - To improve No expatriate consultants Preparation mission Social Welfare in (IDA) nutrition and health standards of required. scheduled for mid-October. Hyderabad, Andhra pre-school children and mothers Pradesh; Bhopal, through the Integrated Child Madhya Pradesh; Development Services Program. Patna, Bihar Industrial Credit 300.0 (R) Cement Industry Restructuring - Local consultant for Pre-appraisal mission and Investment (Bank) To support continuing policy reform sector restructuring scheduled for mid-August. Corporation of and industrial restructuring in policy study; expatriate India Limited; cement sector and to finance needed consultant for bulk Procurement: Advance Industrial investments for: (a) greenfield cement transport, and procurement of $70.0 Development Bank plants in cement-deficit regions; human resource million under ICB of India (b) modernization and restructuring; development. procedures expected. (c) bulk cement transport; and (d) technical assistance for sector strategy formulation, and human resource development and coal quality improvement. Bombay Suburban 200.0 Private Utilities Power - The To be determined. Project identification Electricity (Bank) project would consist of the under way. Supply Limited installation of a power station at (BSES) and/or Dahanu, near Bombay including two Tata Electric coal-fired 250 MW generating units; Company (TEC) the TEC project component will consist of the installation of a 150MW pumped storage unit at Bhira and rehabilitation of 180MW old units in Trombay. Department of 100.0 Himachal Pradesh Urban Development - Local consultants will be Preparation mission Public Works & (IDA) Project would support provision of required for project scheduled for November. Urban essential water supply and preparation. Development, sanitation services including health Simla, Himachal education program, and development Pradesh of land to meet projected housing needs, in selected towns of Himachal Pradesh. Total project cost about $140.0 million. - 59 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency Lender2 INDIA (Cont'd) Governments of 100.0 (R) Second Nutrition - To improve No expatriate consultants Preparation mission Tamil Nadu; (IDA) nutrition and health standards of required. scheduled for July 24. Orissa, pre-school children and mothers Departments of through the Integrated Child Social Welfare Development Services program. Total project cost is estimated at $165.0 million. Ministry of 250.0 (R) National Highways II - To The participating states Appraisal mission Surface Transport (Bank) strengthen and increase capacity of are employing consultants scheduled for October (MOST) about 1,000 km of National Highways for project preparation. subject to RUC study and in up to eleven states; to satisfactory progress on rationalize the funding of National Highways I. development and recurrent works by implementing agreed recommendations of Road-User Charges Study (RUC). Ministry of 100.0 (R) Integrated Watershed Development To be determined. Pre-appraisal mission in Agriculture and (IDA) (Plains) - Stabilization and the field. Selected State development of rapidly degrading Governments watersheds in the Deccan Plateau Region, Rajasthan, Orissa, Tamil Nadu and Gujarat through soil and water conservation, increased fuelvood and fodder production and enhancing land use capability. Ministry of 225.0 Industrial Energy Conservation - To Consultants may be Project preparation under Energy, (Bank) formulate plans for energy required for training, way. Department of conservation in selected industries; project design and Power to establish mechanisms and institutional institutions needed to identify and development. implement the sub-projects; to improve efficiency of processes including substitution of petroleum- based fuels by other sources of energy; and to minimize dependence on unreliable supplies of power, etc. Narmada Valley 350.0 Narmada (Sagar) Dam and Power - Consultants to be used as Awaiting satisfactory Development (Bank) Construction of the Narmada Sagar advisors in contract resolution of outstanding Authority dam and hydropower station to management and construc- issues. Government of generate 1,000 MW of power to enable tion supervision. Short Madhya Pradesh future irrigation of about 300,000 list received. Terms of ha. of land. Total project cost is Reference finalized. estimated at $1,150 million, of which $320 million in foreign exchange. Narmada Valley 70.0 Narmada Sagar Area Development - To be determined. Awaiting satisfactory Development (IDA) Resettlement of about 100,000 people resolution of outstanding Authority affected by Narmada Sagar reservoir issues. Government of submergence, reservoir fisheries, Madhya.Pradesh afforestation of about 60,000 ha, and catchment protection measures on about 300,000 ha. Total project cost is estimated at more than $300.0 million of which $5 million in foreign exchange. - 60 - Member Country, Amount & Project3 Consulting Services Stage of Processing and Imlementing Probable Action on Procurem Agenc, Lender2 INDIA (Cont'd) Government of 100.0 Kerala Urban Development - Local consultants will be Project preparation unt Kerala, 3 cities, (IDA) Diversified investments in three required for project way. 3 Municipal largest cities in the state (Trivan- design and for financial Development drum, Cochin, Calicut) including management. Authorities, slum upgrading, road construction Kerala Water and rehabilitation, traffic Authority, Kerala engineering measures, water supply, Housing Board, drainage, sanitation, solid waste Kerala Public management, and markets. Total Works Department project cost estimated at $200 million, of which $80 million in foreign exchange. Department of 210.0 (R) Electronics - To assist in Consultants will be Approved by the Executi Electronics; (Bank) development of private and joint required for studies and Directors on June 15, 1 Industrial Credit sector electronics firms with fixed technical assistance. and signed on July 7, and Investment investment and working capital. 1989. Corporation of Will also involve a manpower/ India (ICI) and technical training component with Industrial Swiss cofinancing and technical Development Bank assistance. of India (IDBI) State of Tamil 100.0 (R) Agricultural Development I - The Consultant services may Preparation mission Nadu (IDA) project would finance key be required for training scheduled for agricultural investment programs in and monitoring and August/September. the State of Tamil Nadu. The evaluation. project would also focus on institution building and planning, management improvement and manpower development. Government of 200.0 Punjab Irrigation II - To assist GOP Primarily local Appraisal mission in the Punjab (GOP) (Bank) develop a program of investments consultants required. field. Department of 100.0 optimally balanced between modern- Irrigation (IDA) ization and drainage. National 400.0 (R) Northern Region Transmission - Consultants will be re- Negotiations scheduled f Hydroelectric (Bank) The project would comprise the quired for design and mid-November. Power Corporation construction of about 1260 km of 400 construction supervision (Cofinancing possible fa (NHPC) kV and 800 kV transmission lines to of the 800 kV line and upto $200 million). link hydro schemes in the northern substations and the 400 region including the state of Jammu kV high altitude lines. and Kashmir to the rest of the system and related substations. Total project cost estimated at $1,000 million of which $540 million in foreign exchange. Governments of 11.3 (R) Sixth Population (First No expatriate consultants Approved by the Executivi Uttar Pradesh (Bank) Training) - Project will support required. Directors on June 29, (UP), Andhra 113.3 development of state apex training 1989. Pradesh (AP), and (IDA) and research institutes, Madhya Pradesh strengthening of training infra- Retroactive financing of (MP),. Departments structure and staff, and curriculum approximately US$1 millic of Health & development for pre and in-service is anticipated. Family Welfare training of all family welfare staff in States of UP, AP, and MP. Ministry of 145.0 (R) Technology Development - To Consultants required for Negotiations under way. Industry (ICICI) (Bank) involve development of technology studies during 55.0 venture capital and assistance for implementation. (IDA) upgrading research quality control standards and technology import. - 61 - Member Country, - Amount & Project3 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency Lender2 INDIA (Cont'd) Government of 65.0 Hyderabad Water Supply and Consulting services are Appraisal report under Andhra Pradesh, (Bank) Sanitation - Additional 135 mld expected to be required preparation. Hyderabad (40.0 water supply including 60 km trans- for studies during Metropolitan (IDA) mission. Treatment and pumping (a) implementation. - Retroactive financing not Water Works rehabilitation of existing works exceeding US$3.3 million system, (b) sewerage system for technical assisiahce- strengthening and rehabilitation to assist in project including additional sewerage preparation is anticipated treatment (c) low-cost sanitation, and for emergency (d) technical assistance and relocation and training. Total project cost about resettlement. $196 million, of which $36.3 million in foreign exchange. Ministry of 75.0 -Integrated Watershed Development To be determined. Appraisal mission in the Agriculture and (IDA) (Hills) --Stabilization and field. Selected State 25.0 development ol-rapidly degrading Governments (Bank) watersheds in the Himalayan Region through soil and water conservation, increased fuelvood and fodder production and enhancing land use capability. Ministry of 100.0 (R) Temperate Horticulture - Mainly local consultants Appraisal mission Agriculture and (IDA) Increase rural incomes, especially required for preparation. scheduled for September. Governments of 25.0 of poor farmers through improved Uttar Pradesh, (Bank) quality, diversification and Himachal Pradesh productivity of temperate fruits, and Jammu and vegetables and flowers. Project Kashmir would contribute also to improved grading and packing standards, storage, processing and marketing of these products. Indian Oil 340.0 Petroleum Transport - Construction Technical assistance and Approved by the Executive Corporation (Bank) of a 1,450 km petroleum products consultant services will Directors on April 27, Limited (IOC) pipeline, installation of a second be required. 1989. single buoy system at Salaya, (Cofinancing possible for installation of two Naphtha $75-100 million). reformers at Barauni and Digbai, additional investments for Retroactive financing consultancies and training and estimated at about US$20.0 Improve the efficiency of IOC million. refineries. National Thermal 300.0 (R) Regional Power Systems - The To be determined. Appraisal report under Power Corporation (Bank) project would include: (a) preparation. (Cofinancing environmental rehabilitation, (b) for about US$200 million additional coal fired power has been proposed from generation (500 MW), (c) 1,200 km several sources). transmission system (400 kV) development, (d) auxiliary and training facilities, (e) technical assistance for upgrading technology, information system and training. Government-of 300.0 Bihar Power - The project would To be determined. Project being identified. Bihar (Bank) include (a) an emergency program aimed at correcting critical systems constraints and to begin increasing cash generation, (b) a medium-term program to increase the system capacity; and (c) an efficiency improvement program. - 62 - Member Country, Amount & Project3 Consulting Services Stage of Processing ai and Imylementing Probable Action on Procuremen Agency Lender2 INDIA (Cont'd) Department of 400.0 Maharashtra Power - The project Consultancy services Negotiations completed. Irrigation of (Bank) would include: (a) the construction required to assist Approved by the Executiv( Maharashtra State of the Stage IV of the Koyna hydro- government in final Directors on June 15, (for the Koyna electric complex for additional 1000 design, construction 1989. Power Plant); My of capacity; and (b) the supervision and Maharashtra State construction of several transmission inspection of equipment Electricity Board lines and expansion of distribution manufacturing. (for the networks in Maharashtra. transmission and distribution components of the project) Indian 240.0 Petrochemicals Development - Loan No consultants required. Negotiations tentatively Petrochemical (Bank) proceeds would finance foreign scheduled for September. Corporation Ltd. exchange costs of the proposed (IPCL) and expansion of the Nagothane cracker, Central Institute phase II of the wire/cable and high of Plastics density polyethylene, engineering Engineering and polymers projects, Butadiene Technology extraction project and revamping of (CIPET) Polybutadiene rubber units at Baroda, both owned by IPCL. In addition, the loan would include $70 million for imports of polymers for market development and $12 million for technical assistance for CIPET to improve its mold design and training capability for the domestic plastics industry. INDONESIA To be determined 100.0 (N) Basic Education - To improve the To be determined. Project identification (Bank) quality of education at both primary under way. and lower secondary levels. Directorate 100.0 Tree Crops Smallholder Development To be determined. Project identification General Estate (Bank) II - Support Government's objectives under way. Ministry of to improve smallholder production of Agriculture tree crops in existing project areas. Ministry of Home 50.0 Kalimantan Urban Development - To Consultant services will Project preparation under Affairs and (Bank) include integrated urban be required for project way. Ministry of infrastructure investment and implementation. Public Works support for local revenue and institutional development. Ministry of 150.0 Higher Education II - To continue to To be determined. Identification mission Education (Bank) support the higher education scheduled for mid-October. development with emphasis on quality improvement, and planning and management efficiency. Member Country, Amount,& Project3 Consulting Services Stage of Processing and and Ilementing Probable Action on Procurement4 Agency Lender2 INDONESIA (Cont'd) (BKKBN) National 50.0 (R) Population V - Project would Consulting services will Identification mission Family Planning (Bank) suport a major proportion of be required. scheduled for August. Coordinating Indonesia's Family Planning Program Board in close coordination with other donors; project to be based on a five-year population plan prepared by the government and on a recently completed Bank Family Planning -FP) sector study on Family Planning Perspectives for the 1990's in Indonesia. Bank financing would be for program activities in intensification and quality improvement of public FP services; training; information, education and communication; management information system and evaluation. Ministry of 50.0 Poverty Alleviation - Support for To be determined. Identification is under Education and (Bank) income generating skills training way. Culture and community development for poverty groups. Ministry of 300.0 Industrial Restructuring II - To be determined. Project preparation under Industry (Bank) Project would assist in the way. development and restructuring of several industrial subsectors (possibly including wood-processing, electronics, packaging and fine chemicals) through provision of technical assistance and investment finance. Perusahaanmum 175.0 Power Transmission and Distribution To be determined. Project preparation under Listrik Negara (Bank) II - To extend PLN's transmission way. (PLN) and distribution network to meet expected increases in demand for electric power. To include-support for further strengthening of PLN's institutional capacity and for operating efficiency improvements. Ministry of Mines 104.0 (R) Gas Utilization - The project Consultant services Appraisal report under and Energy (Bank) covers transmission and distribution required primarily for preparation. of gas in East Java and North institutional development Sumatra, to industrial, commercial and domestic consumers along with technical assistance for stranghening institution in the -subsector. Ministry of 150.0 (R) Fertilizer Restructuring - In To be determined. Project preparation unde: Industry (Bank) support of policy measures aimed at way. improving the efficiency and competitive position of the sector, the project will fund physical and financial restructuring of selected fertilizer plants. Ministry of 150.0 (R) Financial Sector Restructuring - To be determined. Project preparation Finance/Bank (Bank) Support of GOI legislation and scheduled for February Indonesia policy reform to strengthen the 1990. Indonesian financial system. - 64 - Member Country, Amount & Project3 Consulting Services Stage of Processing a. and Imylementing Probable Action on Procuremen Agency Lender2 INDONESIA (Cont'd) BAPPENAS 250.0 Urban Sector Loan II - Support for Consultant services Project preparation undei Ministry of (Bank) expenditure program and policy required to assist in way. Finance; Ministry action plan for sector development. formulation and of Home Affairs; implementation of policy Ministry of measures. Public Works Directorate 60.0 (R) Jabotabek Urban Development III Consultant services will Appraisal mission General for Human (Bank) - To include-investment in basic be required primarily for scheduled for October. Settlements urban infrastructure and services social development and and small scale credit in low-income small-scale credit communities; related priority solid program formulation, and waste management improvements; and implementation assistance updating of urban mapping together for solid waste with institutional development in management and urban participating local governments. mapping components. Ministry of 10.0 Environmental Management Technical Consulting services will Project preparation under Population and (Bank) Assistance - Technical assistance be required for all way. Environment will be provided through the components. These Ministry of Population and the requirements are Environment to support: (a) currently being defined. implementation of the national strategy for pollution control; (b) policy analysis in support of improved natural resources management; and strengthening of provincial level environmental- planning and management capacity. Directorate 35.0 Fisheries Support Services II - The To be determined. Project preparation under General of (Bank) project would support Government way. Fisheries; objectives of poverty alleviation Ministry of and export development by investing Agriculture in areas with large numbers of poor fishermen and also where productivity is low due to inadequate marketing and/or infrastructure support services. Strengthen coastal aquaculture shrimp farm development, and marketing support services, a small marineculture pilot project for seaweeds, support for environmentally sound aquaculture development through NGOs and institutional improvements to Directorate General of Fisheries. Directorate 250.0 (R) Irrigation Subsector II - A To be determined. Project identification General of Water (Bank) second time-slice operation to under way. Resource support efficient levels of (Japan, Italy and Development; operational maintenance, and Netherlands approached to Ministry of strengthen related institutions, co-finance). Public Works support the extension of the irrigation service fee beyond the pilot areas and the turnover of larger schemes to water users associations. - 65 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Implementing Probable Action on Procurement4 Agency Lender2 INDONESIA (Cont'd) National 350.0 Private Sector Development - A fast- No consultants required. Approved by the Executive Development (Bank) disbursing adjustment loan to Directors on June 6, 1989. Planning Agency, support improved policies and Ministry of incentives for private sector Finance development (including deregulation of industry, rationalization of private investment policies, financial sector and banking reforms, and further improvement in trade policy). Ministry of 175.0 Housing Sector II - Follow-up To be determined. Project preparation under Housing; Bank (Bank) support to GOI's housing policy way. Tabungan Negara action program. Financing of (BTN) 1990-93 time-scale of BTN's mortgage finance program. National 354.0 Paiton Thermal - The project Consultants are already Approved by the Executive Electricity (Bank) includes construction of 2/400 MW in place. Directors on June 22, Authority (PLN) coal fired generating units at 1989. Paiton in East Java, 500 kV trans- mission lines from Paiton to Krian Procurement: Bids for and associated substations at Paiton turbine generators and and Krian. Total project cost about auxiliary equipment and $904 million. for steam generators, have been received and evaluated. Ministry of Mines 250.0 (R) Rural Electrification - A The project is under Appraisal mission in the and Energy; and (Bank) timeslice of the investment program preparation by PLN and field. National for transmission and distribution, Ministry of Cooperatives. Electricity including extension of supply to MOC will require Corporation (PLN) rural areas. consultants for project implementation. Directorate 45.0 (R) Treecrop Smallholder Development Consultant services will Appraisal report under General of Estate (Bank) - To support Government's efforts be required for project preparation. to improve smallholder coconut and implementation. (Japan has been approached rubber production. for Grant funds for technical assistance and financing from the Commonwealth Development Corporation is likely to be available). Procurement: Government has requested retroactive financing of $5 million for agricultural inputs, credit and some civil works. Directorate 90.0 Sulawesi and Irian Jaya/Secondary Consulting services will Project preparation under General'for Human (Bank) Cities Urban Development - To be required for project way. Settlements include integrated urban implementaion. infrastructure investment in selected cities and water enter- prises. - 66 - Member Country, Amount.& Projecti Consulting Services Stage of Processing and Imylementing Probable Action on Procureme Agency Lender2 INDONESIA (Cont'd) Directorate 210.0 (R) Jabotek Urban Development II - Consultant services will Appraisal mission General for Human (Bank) To include investments and rehabil- be required for project scheduled for October. Settlements itation of raw water and treated implementation. water supply facilities, distribu- tion and technical assistance for institutional development, water resources management and pollution control. Ministry of Mines 337.0 Power Sector Efficiency - To support Consultant services will Approved by the Executi and Energy (Bank) a package of actions to improve be required for Directors on June 22, power sector efficiency. The project distribution management, 1989. includes rehabilitation of hydro and hydro-rehabilitation, diesel plants, expansion of telecommunications and distribution facilities, corporate planning. telecommunication facilities, and technical assistance. Total project cost about $580.0 million. Ministry of 104.0 (R) Transmigration Second Stage Consultant services will Appraisal expected to bi Transmigration (Bank) Development - Increased income and be required for three completed in October. (MOT) agricultural production in 8 central advisory teams (Japan has been approact existing trans-settlements; and seven field technical to co-finance). strengthen MOT coordination and assistance teams. implementation capacities for second Procurement: Government stage development; and improve has requested retroacti% overall economic, social and financing of $5.0 millic environmental soundness of the for civil works. transmigration program. Ministry of 100.0 (R) Secondary Education II - Project Foreign specialists in Appraisal report under Education (Bank) will include in-service training of examination, preparation. secondary teachers, supply of textbooks/curriculum and instructional materials (books, evaluation will be science, equipment), training of required. Some local managers/principals and give consultants will also be assistance for examinations and required. management studies. Ministry of 75.0 Health Management and Institutional To be determined. Project identification Health (Bank) Development - The project would: under way. (a) improve efficiency in sectoral resource allocation focussing on communicable disease control; (b) strengthen the institutional framework for planning and budgeting and (c) improve the policy environment and insurance coverage. - 67 - Member Country, Amount & Project3 Consulting Services Stage of Processing anc and Im lementlng Probable Action on Procurement4 Agency Lender2 INDONESIA (Cont'd) Ministry of Home 100.0 East Java and Bali Urban Development Consulting services will Project preparation under Affairs and (Bank) - To include integrated urban be required for project way. Ministry of infrastructure investment and implementation. Public Works support institutional development in local governments. Ministry of Home 25.0 Yogyakarta Rural Development II - To be determined. Previously scheduled pre- Affairs (Bank) Improved agricultural and soil appraisal mission was conservation practices, small-scale changed to a preparation agro-industries, infrastructure and mission and completed. community participation. Pre-appraisal mission now scheduled for October. Bank of Indonesia 75.0 Agricultural Financing - Line of To be determined. Project identification an (Bank) credit for on-lending for determination of the agricultural projects and rural project scope is under enterprises and institutional way. (Japan has been strengthening of regional approached to grant development banks. finance technical assistance, project preparation and Implementation). Ministries of 120.0 Swamps Second Stage Development - To be determined. Project identification Transmigration, (Bank) Strengthen swamp reclamation under way. (Netherlands Public Works institutions and support second has expressed interest ir stage development of existing swamp co-financing). sites, rehabilitate infrastructure and support environmental protection. Ministry of 250.0 Highway Sector - Time slice of the To be determined. Appraisal report under Public Works (Bank) National and Provincial Highways preparation. Global Expenditure Program; strengthening of institutionss Procurement: Some improvement of transport policies. retroactive financing ma be required. Amounts an being assessed. BAPPENAS- 30.0 (R) Construction Industry To be determined. Appraisal mission Ministry of (Bank) Development - Improvement of scheduled for October. Public Works contracting and contract administration procedures; improvement of business environment; strengthening of construction companies and human resources; development of support Institutions. BAPPENAS 120.0 (R) Professional Human Resources To be determined. Appraisal report under (Human Resources (Bank) Development - Professional human preparation. Development resource development through Policy & overseas and domestic postgraduate Procurement: Retroactiv Planning); training and related policy and financing for up to US$5 BPP TeKnologi institutional strengthening; science million proposed for (Science & and technology staff development, building adaptations and Technology for and improvement in science and fellowship training. Industrial technology policy analysis and Development); coordination and management. Ministry of Finance; Overseas Training Office - 68 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Imylementing Probable Action on Procurement4 Agency Lender2 INDONESIA (Cont'd) Ministry of 36.1 (R) Ministry of Public Works Consultant services will Board presentation Public Works (Bank) Institutional Development and be required for scheduled for July 25, Training - This is a follow-up components dealing with: 1989. project to MPW Manpower Development (a) staff development, Project: (a) to implement throughout and (b) improvement of Procurement: Proposals the ministry and its provincial management system. for budgeting, planning offices, the systems and procedures and MIS consultants and developed under the first project to for staff development and assist decentralization; (b) to training will be invited bring about ministry-vide, in August. institutional and organizational developments to facilitate decentralization; (c) to expand staff development; and (d) to strengthen management. PERUMTEL 300.0 (R) Telecom III - Development of Consultant services will Pre-appraisal mission (Bank) communications network in Indonesia, be required for scheduled for September 4. and enhancement of telecom services components dealing with: in Jakarta and other major cities. (a) computerized network Procurement: Civil and administration system; electrical work, local (b) supervision of cable network detailed outside plant design, supply of construction; (c) materials and construction improvement of management to be financed by the Bank system; (d) human and co-financiers. resource development and Invitation notice for management; (e) prequalification to be procurement and inventory announced in June. Bid management system; and announcement expected in (f) financial management November. and accounting system. Ministry of Home 30.0 Irian Jaya Area Development - To be determined. Project preparation under Affairs (Bank) Improve the overall socio-economic way. conditions of Irian Jaya through an integrated area development project comprising health, education, agriculture and infrastructure development activities in four pilot areas. KOREA Ministry of 34.0 Juam Integrated Water Supply - To Local consultants Appraisal mission Construction (Bank) improve water service in Kwangju financed by the scheduled for mid-August. area, a low income region in Korea, government are completing financing priority water works and the final engineering for Procurement: Retroactive continuing a dialogue with Juam and Kwangju areas. financina not exceeding Government on a major sector 10% of the loan may be reorganization. required for pipes Procured after August 1989. Ministry of 45.0 (R) Universities Science and Consultants not required. Preparation under way. Education (Bank) Technology Research - To upgrade capacity and quality of post graduate institutions to train and conduct research in advanced technologies. Ministry of 32.0 (R) Technology Advancement II - Consultants not required. Appraisal report under Science & (Bank) Assist in improving the capacity of preparation. Technology three R&D institutions to undertake basic research and provide technical advice and services to industry. - 69 - Member Country, Amount & ProjectJ Consulting Services Stage of Processing and and Imlementing Probable Action on Procurement4 Agency Lender2 KOREA (Cont'd) Ministry of 200.0 (R) Road Improvement - Project will Consultants not required. Approved by the Executive Construction (Bank) assist in financing investment Directors on May 16, 1989. (MOC) requirements for road improvement Loan signing -scheduled for program (1989-92) being implemented late October 1989. by Ministry of Construction (MOC) including: (a) paving and/or widening of national and provincial roads; (b) maintenance and rehabilitation; and (c) improving road maintenance and road safety. LAO PEOPLE'S DEMOCRATIC REPUBLIC Ministry of 30.0 Highway Rehabilitation - To be determined. Project preparation under Transport, (IDA) Improvements to National Route 13 way. Construction, between Savannannkhet and Nam Kading Posts & and road maintenance components. Telecommunica- tions Ministry of 15.0 (R) Upland Agricultural Development Australia and France Appraisal report under Agriculture; (IDA) - Project would support primarily would support consultants preparation. Ministry of upland crop intensification, for technical assistance (Co-financing from /Transportation including coffee and irrigation and training. Australia and France Champassak rehabilitation, research and likely). Province extension development, environmental protection; rural road repair and maintenance; and technical assistance training. Ministry of 40.0 (R) SAC - To assist government with Consultants not required. Approved by the Executive Finance (IDA) implementation of economic reforms, Directors on June 14, stimulate private sector activities, 1989, and signed on June improve state enterprise management, 23, 1989. and reform tax system and banking sector. Retroactive financing of a maximum of $8.0 million provided for expenditures incurred after March 1. 1989. Ministry of 20.0 (R) Telecom II - Continuing Consultants assisting in Appraisal mission in the Construction, (IDA) expansion and development of preparation. field. Transport, essential telecommunications Posts, and services. Digital Exchange for Communications Vientiane and some provincial capitals; development of long- distance micro wave links, consolidation of institutional reforms and related training. MALAYSIA Ministry of 102.0 (R) Highway Rehabilitation & Consultant services Appraisal report under Public Works (Bank) Improvement - Project includes required for construction preparation. bridge replacement program, highway supervision and technical improvement, road rehabilitation and assistance. Retroactive financing is road safety component, and axle load recommended for component. expenditures incurred after May 1. 1989 up to a maximum of US$10 million. -70- Member Country, Amount & Projecti Consulting Services Stage of Processing z and Imylementing Probable Action on Procuremeni Agency Lender2 MALAYSIA (Cont'd) Ministry of 80.0 Primary and Secondary Education III To be determined. Preparation mission Education (Bank) - Improve quality of education, scheduled for November. increase managerial efficiency, improve access to better education. Reinforce and complement ongoing projects through addition of project processing resources; additional school facilities and state resource - centers; establishment of an educational technology network and strengthening of school-based evaluation. To be determined 60.0 Sabah Forestry II - Follow-on to the To be determined. Project preparation unde (Bank) Sabah Forestry Technical Assistance. way. The project would establish a pulpwood plantation with smallholder outgrowers to supply the existing mill and/or for export, including establishment and maintenance of about 40,000 ha of trees, technical assistance and institutional support. Federal Land 71.5 (R) Sabah Land Settlement and Consultant services Loan approved by the Development (Bank) Environmental Management - Time required for Executive Directors on Authority (FELDA) slice financing of the consolidation environmental activities. April 25, 1989, and sign of 60,250 ha of FELDA's Land on July 18, 1989. Settlement Program on Dent Peninsula (UNDP co-financing of in Sabah, protection of Tobin US$0.5 million agreed in Wildlife Reserve and support for principle). development of State conservation strategy. Retroactive financing of US$7.1 million provided for expenditures after January 1. 1989. Sabah Electricity 71.0 (R) Sabah Gas and Power - (a) A Consultancy services Negotiations scheduled fc Board (Bank) combined cycle power plant of about required for power plant, January 1990. 60 MW capacity at Kota Kinabulu; (b) and gas transmission a 58 km submarine gi7s- tp-eline from system.----- Retroactive financing is Erb West to Kota Kinabalu and (c) a recommended for . loss reduction/efficiency - expenditures incurred improvement package for SEB. Total after May 15, 1989 to project cost estimated at $112 cover advanced contractir million of which about $86 million for consultancy services in foreign exchange. up to $1.00 million each for Sabah Electricity Board and Sabah Engineering Corporation. - 71 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Imlementing Probable Action on Procurement Agency Lender2 MALAYSIA (Cont'd) Rubber Industry 71.0 (R) RISDA - To improve RISDA's Consultant services Appraisal report under Small Holders (Bank) institutional efficiency and support required for studies on preparation. Development itz development program. The mini-estates, Authority (RISDA) project would finance development cooperatives, nurseries, expenditures over 1990-92, including computerization, and replanting of old rubber and monitoring and maintenance of replanted areas evaluation. during Imaturity, rehabilitation of some replanted areas, agricultural inputs, infrastructure development, extension and training, vehicles and equipment (including computer equipment), and studies. Total project cost US$209.1 million of which US$73.7 million is in foreign exchange. To be determined 40.0 Rice Industry Restructuring - To be determined. Definition of project (Bank) Project scope will be decided on scope pending discussions basis of recently completed sector with Government. study. MALDIVES State Trading 5.0 Fisheries III - To continue support To be determined. Project identification Organization, (IDA) for fisheries by developing a tuna under way. Government of fish canning and freezing complex in Maldives -the South; land based freezing facilities on islands in the North and South; training and technical assistance; and fish collections vessels. Maldives.Airport 6.0 (R) Male Airport Upgrading - The Consultants for project Project is under Authority (IDA) project would include: (a) preparation have been preparation... Detailed stabilization of a section of the recruited and are engineering studies runway; (b) protection works of the financed by Kuwait Fund. expected by end 1989. seawall at the end of runway (c) (Co-financiers would expansion of passenger terminal include Kuwait Fund, OPEC buildings (d) extension of aircraft Fund and Islamic parking aprons. Total estimated, Development Bank). cost US$22.0 million of which US$20.0 million will be in foreign exchange. - 72 - Member Country, Amount & Project3 Consulting Services Stage of Processing ar and Imylementing Probable Action on Procurement4 Agency Lender2 MYANMAR, UNION OF Irrigation 42.0 Tank Irrigation II - The project Consultants will be Negotiations and Board Department (IDA) would complement the Government's required for technical presentation remain efforts in agricultural and operational unscheduled in view of diversification with particular assistance. current country situatior emphasis on production of exportable (UNDP co-financing of and import substituting crops. US$1.8 million-likely). Major components of the project are: (a) construction of a 110 feet high earth-filled dam in the Yin Basin; (b) construction of main canals and irrigation distribution system for the command area; (c) agricultural support including extension, research and inputs for crop diversification; (d) technical assistance and training; (e) resettlement; and (f) monitoring and evaluation. Ministry of 65.0 Industrial Rehabilitation - Consultants will be Further processing remain Industry (IDA) Rehabilitation and modernization of required for engineering, unscheduled in view of existing production capacities in technical and operational current country situation textile, pharmaceutical and assistance. pulp/paper subsectors. Technical assistance and training. Total project cost estimated at $139.0 million, of which $65.0 million in foreign exchange. Ministry of 45.0 Infrastructure Rehabilitation - Consultants will be Negotiations completed. Transport and (IDA) Contribute to the rehabilitation and required for a nationwide Given the current country Communications, improved maintenance of: (a) inland transport study and water situation, project likely and Ministry of waterways fleet and dockyards supply sector review; for to be reappraised. Home anf operated by the Inland Water unaccounted water Religious Affairs Transport Corporation; (b) railway management program; cars and locomotives; (c) trucks and workshop management; MIS buses operated by Road Transport and accounting; for Corporation; (d) water suply, studies on river fleet sewerage, refuse collection, optimization; container management and road facilities in handling; and traffic Rangoon and up to 40 other towns. engineering in Rangoon. NEPAL Department of 30.0 (R) Groundwater Irrigation III - To Previously engaged Preparation mission in th, Irrigation (IDA) construct farmer-managed tubewells, consultants expected to field. establish model for farmer-managed continue. groundwater development, Improve tubevell operation and maintenance, assist preparation of the proposed irrigation sector project, and strengthen Department of Irrigation. Department of 20.0 (R) Irrigation Sector - To (a) Consultancy services to Project identification Irrigation (IDA) construct small and medium farmer be provided by individual under way. managed surface schemes and consultants financed rehabilitate existing farmer managed under an on-going UNDP Retroactive financing for surface schemes in the Hills and project. about US$2.0 million is Terai areas; (b) construct farmer- proposed for financing thq group managed groundwater schemes on first batch of sub- the Terai; (c) institutional projects. development support. - 73 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Imylementing Probable Action on Procurement4 Agency Lender2 NEPAL (Cont'd) Ministry of 20.0 Basic Education - To continue To be determined. Project under preparation. Eudcation and (IDA) support to primary education and Culture non-formal education. Ministry of 15.0 Population and Health - To improve To be determined. Project under preparation. Health (IDA) health conditions and reduce population gorwth by strenghening of family planning and maternal child health programs. Water Supply and 20.0 (R) Water Supply and Sanitation Consultancy for project Appraisal mission Sewerage (IDA) Rehabilitation - First in a series preparation funded by tentatively scheduled for Corporation of projects in a 15-year UNDP completed in March. September. comprehensive development program Contract to be extended (Cofinancing likely from comprising water supply, operational to cover preparation upto GTZ, UNDP, and Japan). and management improvements, appraisal stage. rehabilitation, source development Consultants will be Procurement: and sewerage and appropriate required for detailed Prequalification and/or sanitation for urban and peri urban design and supervision. tendering likely in the areas. Likely components to latter part of 1989. include: (a) rehabilitation and improvements of distribution network and treatment plants and pumping stations; (b) reduction of unaccounted for water; (c) ground water treatment; and (d) financial management and operational improvements; and (e) technical assistance including detailed design and tender document preparation. Total project cost US$40.0 million of which US$20.0 in foreign exchange. Ministry of 22.8 (R) Earthquake Affected Area Schools Consultants will be Approved by the Executive Housing and (IDA) Rehabilitation - To assist the required for project Directors on June 27, Physical Planning government in implementing its auditing, independent 1989. recovery program for the sector; to design review, and for make the reconstructed schools more monitoring of project earthquake resistant; and to develop management procedures. appropriate procedures and technology for remote area construction. Total project cost is estimated at about US$18.8 million equivalent. Tribhuvan 11.4 Engineering Education - (a) expand Consultant services will Approved by the Executive University/Insti- (IDA) the output of technicians and be required for Directors on June 22, tute of engineers; (b) improve the quality curriculum development, 1989. Engineering of engineering education; and (c) management, (Cofinancing: CIDA $3.9 improve the management of Institute administration and million; Swiss Development of Engineering. finance. Corporation $8.1 million). Ministry of Works 21.0 Multimodal Transport - Will focus on Consultants have been Appraisal report under and Transport; (IDA) introduction of intermodal container recruited to advise NTC preparation. Nepal Transport services and will implement on container operations Corporation (NTC) administrative/operational and contract management. improvement measures and training programs for improved transit management. Project components are: procurement of container chassis, trucks, handling equipment, construction of combined container terminal, technical assistance, and training. Total project cost estimated at $30.0 million. - 74 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Imylementing Probable Action on Procurement4 Agency Lender2 NEPAL (Cont'd) Ministry of 30.0 Forestry III (Hills) - Will aim at Consultants required are Approved by the Executive Forests and Soil (IDA) transferring management mainly for training and Directors on May 30, 1989. Conservation, responsibility of Government forests extension, silviculture, (Cofinancing agreed with Department of to local conmunities, establishing land use planning, DANIDA $6.85 million and Forests coammunity plantations, distributing monitoring and evaluation UNDP 0.5 million). seedlings for private planting, and forest management. strengthening Forest Department's Procurement: Retroactive project implementation capability, financing of upto $2.97 training, developing fuel efficient million proposed. stoves, and expanding the forest research program. Total project cost estimated at $33.0 million. Ministry of Works 32.8 Arun III Access Road - To construct Previously engaged Approved by the Executive and Transport; (IDA) access road to Arun III hydropower consultants have Directors on May 30, 1989. Department of site, and to open up north-south completed detailed Roads corridor in the Eastern Hills. engineering and bid Procurement: In March Components are: construction of 192 documents. They are bids were invited for km road, construction of maintenance expected to provide civil works from workshop. Total project cost construction supervision. prequalified contractors. estimated at $40.0 million of which Retroactive financing for US$28.4 million in foreign exchange. US$3.3 million has been approved. Ministry of 60.0 (R) Structural Adjustment II - Consultants may be Approved by the Executive Finance (IDA) Project to include further reforms required. Directors on June 27, of macroeconomic management, public 1989. Signing scheduled investment programming and for July 21, 1989. agricultural policy (inputs distribution and irrigation), and (Co-financing with Japan financial sector. being explored and Federal Republic of Germany has committed US$5.0 million). Government of 15.0 Industrial Finance - To support the Consultants may be Appraisal mission Nepal (IDA) formulation and financing of required. More tentatively scheduled for industrial development programs of information on consultant November. high priority, and to develop a more requirements will be viable and competitive industrial known at a later date. financing system. Ministry of 20.0 Third Agricultural Extension and To be determined. Project in abeyance Agriculture (IDA) Adaptive Research - Increase pending agreement with agricultural, horticultural and Government on research and livestock production, (b) improve extension strategy. institutional framework of extension, (c) integrate extension services for agriculture, horticulture and livestock production at field level and (d) strengthen extension/research linkage in the terai area and Western Hill region of Nepal. To be determined 120.0 (R) Hydro Power (Arun) - 402 MW To be determined. Project preparation under (IDA) run-of-river hydropower plant with way. associated transmission facilities and institutional strengthening of the Nepal Electricity Authority. I' - 75 - Member Country, Amount & Project0 Consulting Services Stage of Processing and and Im?lementing Probable Action on Procurement4 Agency Lender2 PAPUA NEW GUINEA Posts and 17.0 (R) Telecom III - To assist PTC to To be determined. Appraisal mission in the Telecommunica- (Bank) manage its operations more field. tions Corporation efficiently; to improve the quality of service and to extend services to Procurement: rural areas. Specifications for digital exchanges were prepared and are being reviewed. To be determined 40.0 Public Service Training - To be determined. Project identification (Bank) Development of incentives and under way. delivery system for inservice training for public and private sector, staff. Department of 19.6 Land Mobilization - Strengthen the Consultants will be Approved by the Executive Lands and (Bank) capacity of the Department of Lands required to assist in: Directors on May 4, 1989. Physical Planning and Physical Planning to develop (i) institution building; policy, deliver land services and (ii) training and (iii) (Australian International generate revenues. The project also land administration. Development Assistance includes systems for mobilizing land Bureau co-financing for and resource information, about US$6.4 million equivalent agreed to in principle). Procurement: Retroactive financing for US$l million would be provided for expenditures incurred. after January 1. 1989. Department of 25.0 Oro Province Nucleus Estate and To be determined. Appraisal mission Agriculture and (Bank) Smallholder - To develop about tentatively scheduled for Livestock and 12,700 ha of land in areas of Oro September. Higaturu Oil Palm Province into oil palm and cocoa (Commonwealth Development Pty. Ltd. estates and oil palm smallholder Corporation has expressed settlements. interest in co-financing). PHILIPPINES Metropolitan 40.0 (R) Angat Water Supply - Local consultants Negotiations scheduled for Waterworks and (Bank) Construction of transmission completing final design. August 1, 1989. Sewerage System pipelines to improve water services (MWSS) in Manila. Procurement: Advance contracting planned for transmission pipelines for contracts with a total value of about $40.0 million. Retroactive financing of upto USS4.0 million from May 1, 1989 recommended. - 76 - Member Country, Amount & ProjectJ Consulting Services Stage of Processing and Imlementing Probable Action on Procuremen Agency Lender2 PHILIPPINES (Cont'd) Development Bank 65.0 (R) Industrial Investment - Provide Services required for Negotiations scheduled of the (Bank) term financing to medium and large training and technical July 24. Philippines (DBP) industrial firms. The IBRD loan assistance in industrial will be made to the restructured DBP restructuring, including which as a wholesale bank will sub-sectoral studies. channel the funds to participating Consultant selection has financial institutions. Provide been finalized. training for onlending to enterprises and technical assistance to Government and DBP in conducting subsectoral studies focusing on industrial restructuring and related strategies and policies. Government of the 350.0 Energy Sector - To support the To be determined. Appraisal mission in thE Philippines, (Bank) implementation of a comprehensive field. Office of Energy policy package in the areas of Affairs, National sector coordination, investment, Power finance, pricing and environmental Corporation, monitoring of the Energy Sector. Philippine The project would finance the National Oil 1990-92 time-slice of the Energy Company, Energy Sector's Investment Program. Regulatory Board, Environmental Management Bureau Department of 82.0 Southern Philippines Consultants will be Project preparation undE Transport and (Bank) Telecommunication - Install 70,000 required during way. Communications lines of telephone switching implementation. (DoTC) equipment at 42 locations in Bilateral funding of Mindanao and Visayass associated consultants likely. transmission equipment for interconnection of exchanges; cables, poles etc. for connection of subscribers and technical assistance for training and development of regulations and operator(s). Department of 100.0 (R) Environment and Natural Resource To be determined. Project preparation unde Environment and (Bank) Management - Develop institutional way. Natural Resources and incentive structure leading to (Co-financing being (DENR) and use of sustainable resource explored with Italy, Department of management techniques through Canada, Japan and the Agriculture (DA) appropriate rents for use of public United States). resources, increased tenure security for resources users; upgrade support services for extension and regulation in forestry and upland agriculture; and provide an institutional source of finance for poverty alleviation projects. National 30.0 Communal Irrigation II - To support To be determined. Project preparation unde Irrigation (Bank) expansion of NIA's ongoing communal way. Authority (NIA) irrigation program, with particular (Co-financing being emphasis on expanding successful explored with IFAD). irrigator association program and strengthening agricultural support services to communal schemes. - 77 - Member Country, Amount & Projecti Consulting Services Stage of Processing and and Imlementing Probable Action on Procurement Agency Lender2 PHILIPPINES (Cont'd) Department of 150.0 (R) Education Sector - To support Consultants would be Appraisal mission Edu6ation, (Bank) (a) actions related to elementary required for scheduled for October. Culture & Sports school dropout reduction, higher implementation. (DECS) education improvement and management (Co-financing being improvement (b) 1990-92 timeslice explored with Overseas of elementary education expenditure Economic Cooperative program. Fund). Retroactive financing of elixible expenditures incurred after July 1989 is proposed. PHILIPPINES 65.5 Manila Power Distribution - The Consultants not required. Approved by the Executive MERALCO (Bank) project will: (a) enable MERALCO to Directors on June 8, 1989. improve the technical performance of its transmission and distribution systems within its franchise area; and (b) support enhancements to MERALCO's financial capabilities through programs to increase the company's capitalization and improve its technical and commerical operations. Philippines 135.0 (R) Coconut Farms Development - To To be determined. Appraisal mission in the Coconut Authority (Bank) increase incomes of small-scale field. coconut farmers, boost foreign (Co-financing being exchange earnings and strengthen explored with Australia, services in sector by provision for Federal Republic of hybrid planting, rehabilitation of Germany and Japan). existing stands, research and training. Department of 70.1 (R) Health Development - To assist Consultants may be Approved by the Executive Health (DOH) (Bank) the Government to increase the required during Directors on June 22, effectiveness and coverage of the implementation. 1989. four health impact programs, strengthen the efficiency of Department of Health operations through management improvement and provide support for community health development through collaborative action among local governments, NGOs, communities and the DOH. Total project cost $108.4 million. Department of 15.0 Agriculture Support Services II - To be determined. Preparation under way. Agriculture (DA) (Bank) Project would include second phase of Bank assistance to support institutional strengthening and expansion of high priority agricultural research and extension activities. Department of 300.0 SAL III - To support program of To be determined. Project identification Finance (Bank) continuing structural adjustment, under way. including trade liberalization, public investment reforms, and social sector policies. - 78 - Member Country, Amount & Project3 Consulting Services and I lementing Probable Agency Lender2 PHILIPPINES (Cont'd) Department of 45.0 (R) Second Municipal Development - Consultants have been Negotiations scheduled fc Public Works (Bank) Project will assist the local recruited. mid-August. (DPW) government in Metro Manila and the surrounding provinces: (a) address sanitation and environmental problems in low income communities through the provision of basic infrastructure and (b) finance municipal services and investments through access to loan financing. Departments of 50.0 (R) Rural Water Supply and Local consultants being Project preparation undez Health (DOH), (Bank) Sanitation II - To improve water appointed. way. Public Works and supply and sanitation in the Highways (DPWH), provincial and rural areas through and Local Water the provision of low cost services, Utilities and strengthening of implementing Administration agencies and local rural water (LWUA) supply and sewerage associations (RWSA). SOLOMON ISLANDS Ministry of 10.0 (R) Forestry Development - The To be determined. Project preparation under Economic Planning (IDA) project would establish a tropical way. (Government of hardwood source for a chip and Japan, Asian Development lumber export industry through Bank and Australian reforestation on logged-over land International Development and fund technical assistance and Assistance Bureau institutional development. approached to co-finance; Commonwealth Development Corporation has confirmed co-financing of US$35.0 million). SRI LANKA Ministry of 50.0 Poverty Alleviation and Employment - To be determined. Project under preparation Policy Planning (IDA) To facilitate access to resources to and the poor for self-employment. Implementation Credit programs would be accompanied by vocational training and entrepreneurial development. The project would also include nutrition interventions and rural works. Sri Lanka 50.0 (R) Second Telecommunications - Consultants for project Preparation mission in the Telecommunica- (IDA) Project will provide: (a) preparation are financed field. tions Corpora- assistance in restructuing of the under PPF and by ADB. Two PPFs for a total of tion sector; (b) institutional suport to $1.2 million have been Sri Lanka Telecommunications approved for sector Corporations; and (c) help finance restructuring and project the 1990-94 time slice of preparation. (ADB has telecommunications investment $30.0 million in its FY90 program. Total project cost lending program and the estimated at about $260.0 million of other co-financing may which about $180.0 will be in come from DANIDA, FINNIDA, foreign exchange. OECF and others). Ceylon 30.0 Power Distribution and To be determined. Preparation mission Electricity Board (IDA) Rehabilitation - Project involves scheduled for September. rehabilitation of distribution system for 55 local authorities to be taken over by CEB, expansion of CEB's 33kv network and associated consulting services. - 79 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im?lementing Probable Action on Procurement4 Agency Lender2 SRI LANKA (Cont'd) Ministry of 23.0 Local Government Development - Consultants required for Feasibility study on Finance (IDA) Support to the restructured Local feasibility studies, restructured LLDF Loans Development Fund (LLDF) as a detailed design, future completed. MOF to appoint vehicle for financing the investment project preparation. an investment advisor to requirements of local authorities test draft policy and (LAs). Project will consist of (i), eligibility criteria and line of credit to the LLDF; and (ii) carry out pilot testing on technical assistance and training.' about six sub-projects. Sub-loans would finance (i) social Regulations governing LLDF infrastructure projects e.g. roads may need amending in light and sidewalks, parks and of the realignment of playgrounds, drainage, street central Ministries. lighting; and (ii) revenue generating projects e.g. offices, markets, trade centers and slaughterhouses. Total project cost US$28.0 million of which US$14.0 in foreign exchange. Road Development 30.0 (R) Third Road Maintenance and Expatriate and local Project preparation has Authority (RDA) (IDA) Rehabilitation - Components consultants have been been delayed due to change include: rehabilitation and limited appointed. Preparation in Government priorities improvement of about 500 km of of detailed engineering and budgetary constraints. primary and secondary trunk roads; designs for road sections PPF advance of US$165,000 strengthening, repair and representing prevailing had been approved. replacement of about 34 bridges; conditions of road Supplementary advance of procurement of workshop tools and network and first year US$175,00 has been laboratory equipment; technical contract packages is approved. assistance for road maintenance, progressing. Consultants planning supervision and execution will also.be required for Procurement: All road of maintenance program; and additional design and for work and major bridge implementation of an action plan to supervision. contracts will be under strengthen the capacity and improve ICB. Small bridges will efficiency in RDA. Total project be under LCB and/or force cost US$61.0 million of which account. US$30.0 will be in foreign exchange. Ministry of 48.0 (R) General Education - To upgrade Consultants' services Appraisal report under Education (IDA) the quality of basic education and required for development preparation. improve the Government's overall management systems, An IDA project preparatior planning and implementation capacity training courses, and facility for $225,000 has in the education sector. Includes studies of been approved. upgrading of schools, management employment/education strengthening and management linkages. training. Ministry of 30.0 (R) Integrated Agricultural Support To be determined. Preparation mission Agriculture, Food (IDA) Services - (formerly Second scheduled for October. and Cooperative Agricultural Extension) - The project would provide additional support to develop a sustainable adaptive researchlextension effort which will permit the country to expand and diversify its cropping pattern. Ministry of 25.0 (R) Transport I - To include Previously engaged Project preparation under Transport/Road (IDA) procurement of equipment, spare consultants have been way. Development parts and repairs for railway appointed. Authority operations; replacement of Sri Lanka Consulting services are Transport Board (public) buses, line being financed under an of credit for private buses; IDA Project Preparation improvement of traffic management in Facility advance for a Colombo Municipality-and technical total of US$76,000. assistance for transport planning. - 80 - Member Country, Amount & ProjectJ Consulting Services Stage of Processing azt and Im?lementing Probable - Action on Procurement4 Agency Lender2 SRI LANKA (Cont'd) Ministry of 60.0 (R) Public Enterprise Restructuring Consultants have been Appraisal mission Finance and (IDA) - To support the rationalization/ appointed. tentatively scheduled for Planning/Line privatization of major public sector September. Ministries industrial corporations/enterprises in cement, textile and general manufacturing subsectors. Ministry of Lands 19.0 (R) Forestry II - To implement a Consultancy services Approved by the Executive and Land (IDA) five-year time-slice of the Forestry would be required for Directors on June 15, Department Master Plan. The project would technical assistance. 1989. include (a) plantation establishment (Co-financing agreed with and development of non-forest wood FINNIDA for $2.8 million resources; (b) management of forest to finance technical resources; (c) protection of forest assistance component. estate; (d) wood production; (e) UNDP, ODA and CIDA remain rehabilitation and expansion of wood as potential donors). industries; (f) institution building; education and training. Procurement: About US$2.9 million for vehicles and US$0.8 million for equipment under ICB. THAILAND Ministry of 93.0 (N) Highway Sector III - To continue To be determined. Project preparation under Communications (Bank) support for the country's 1987-91 way. highway development program. Department of 30.0 Land Titling II - Support To be determined. Project preparation under Lands (Bank) government's long-term national land way. (Co-financing from titling program. Australia being sought). Provincial 26.0 (R) Power Transmission and Consultants will be Pre-appraisal tentatively Electricity (Bank) Substation Development - To upgrade required. scheduled for December. Authority (PEA) PEA's transmission system. Provincial 40.0 Second Provincial Water Supply - Consultants have been Project under preparation. Waterworks (Bank) Major expansion of about 9 water recruited. (Preparation co-financed Authority supply systems, upgrading of about with Italian Government 30 systems, provision of maintenance Aid). tools and equipment, institutional development. Bangkok 51.9 Bangkok Flood Control - To provide To be determined. Further processing in Metropolitan (Bank) flood protection and drainage in the abeyance pending Administration city core area, technical Government decision to (BMA) assistance, and training. Total borrow for the project. project cost estimated at $90.8 million, of which foreign exchange component $26.6 million. TONGA Tonga Development 3.0 (R) Tonga Development Bank II - Consultants will be Appraisal mission Bank (TDB) (IDA) Project would provide TDB with long- required. completed. ADB staff to term resources to meet private prepare appraisal report. investment demand in agriculture, industry and tourism sectors. - 81 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im?lementing Probable Action on Procurement4 Aiency Lender2 VANUATU Ministry of 5.0 Housing - To assist Government and Consultants will be UNDP/UNCHSIUNESCAP Finance and (IDA) NBC to develop appropriate sector required. financed project Housing; National policies and to provide affordable preparation under way. Housing housing to lover-income groups. The Corporation (NHC) project would finance approximately 500 NEC plots and houses. WESTERN SAMOA Departments of 4.5 Telecom (ADB) - Strengthen Consultants will be Approved by the Executive Treasury; Posts (IDA) telecommunication networks in required. Directors on June 8, 1989. and Western Samoa. Telecommunica- tions - 82 - Member Country, Amount & Project3 Consulting Services Stage of Processing and Imylementing Probable Action on Procureme Agency Lender2 III. EUROPE, MIDDLE EAST AND NORTH AFRICA ALGERIA Ministry of 75.0 Farm Equipment Rehabilitation and Consultant services Project under preparati( Agriculture (Bank) Distribution - Establish a likely to be required. sustainable system for the import, distribution and sale of spare parts for agricultural equipment. To be determined 100.0 Construction Industry - Improve Consulting services Project under preparatic (Bank) performance of construction industry likely to be required. through credit and modernization programs. Ministry of 300.0 (R) Economic Reform Support - Consulting services Negotiations scheduled I Finance (Bank) Provide support to Government in likely to be required. July 27. implementing its economic reform program which seeks to restore Procurement: The internal and external equilibria Government has requested within a framework for sustainable disbursement of up to growth and improved labor US$60.0 million of the absorption. proposed loan to retroactively finance it general imports since April/May 1989 (excludin items covered in the negative list). To be determined 200.0 Cement Restructuring - Restructure Consulting services Project preparation unde (Bank) cement industry through likely to be required. vay. debottlenecking and other improvements to selected cement production units, technical assistance for management,. operations and distribution. Societe Nationale 60.0 First Petroleum - Provide technical Consulting services Project preparation undei pour la (Bank) assistance to SONATRACH for likely to be required. way. Recherche, la exploration promotion, technical Production, le training, and secondary oil Transport, Ia recovery. Transformation et la Commercialisation des Hydrocarbures (SONATRACH) Ministry of 20.0 Health Management - Improve health Consultant services Preparation under way by Health (Bank) management system and planning. likely to be required. Bank/Government. Ministry of 23.0 (R) Research & Extension - Improve Consultant services Appraisal report under Agriculture (Bank) efficiency of research and extension likely to be required. preparation. services in light of sector reforms. Ministry of 50.0 Sigher Education - Improve quality Consultant services Preparation under way by Higher Education (Bank) of output at selected universities, likely to be required. Bank/Government. assist in sector management and planning. SONELGAZ 160.0 Power III - Project would finance Consultant services Approved by the Executive (Bank) part of SONELGAZ's 85/89 Investment likely to be required. Directors on June 29, Program. 1988. - 83 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Imlementing Probable Action on Procurement4 Agency Lender2 ALGERIA (Cont'd) Banque de 110.0 First Agricultural - To extend line Consultant services Approved by the Executive l'Agriculture et (Bank) of credit; provide financing for likely to be required. Directors on December 13, de Developpement staff training, management and 1988. Rural (BADR) financial control system and network expansion. Societe Nationale 143.0 Railway II - To help rehabilitate Consultant services Approved by the Executive des Transports (Bank) Societe Nationale des Transports likely to be required. Directors on June 24, Ferroviaires Ferroviaires (SNTF), and provide 1988. technical assistance to improve financial management and operations. Ministry of 63.0 (R) Ports III - Rehabilitation and Consultant services Approvod by the Executive Public Works; and (Bank) modernization of existing port likely to be required. Directbrs on June 29, Ministry of facilities, training equipment. 1989. Transport Ministry of Heavy 80.0 Industrial Efficiency Pilot - Consultant services to be Appraisal. report under Industry (Bank) Provide support to a few selected required. preparation. enterprises to improve their operational and management efficiency. Ministry of 250.0 Financial Sector Reform - Provide Consultant services Preparation under way by Finance (Bank) support to Government in likely to be required. Bank/Government.. implementing financial sector reforms. Ministry of 110.0 Mitidja Irrigation - Construction To be determined. Approved by the Executive Hydraulics, (Bank) and rehabilitation of irrigation Directors on May 30, 1989 Environment and infrastructure in the Mitidja Basin. Forestry Establishment of Mitidja Water Management Office. Total project cost about $150 million, of which 76 million in foreign exchange. Ministry of 15.0 (R) Bank Audit Training System - Consultant services Appraisal mission in the Finance (Bank) Train middle and higher level likely to be required. field. management staff, especially in project evaluation techniques and development and strengthen local auditing capacity. CYPRUS Electricity 60.0 Electricity Generation - Increase Consultant services will Negotiations substantial Authority of (Bank) power generating capacity, through be required to carry out completed. Cyprus (EAC) financing first phase of investment a management and program to construct coal-fired organization study of EAC Procurement: The power plant at Vasilikos, including and for construction Government has requested environmental impact study and management and other retroactive financing of technical assistance. Total project technical assistance. up to .$5.0 million to cost about $274.0 million, of which Consultants have been cover bosts of $191.0 million in foreign exchange. appointed to carry out consultants' services an the environmental impact equipment, incurred sinci assessment study. March 15, 1989. - 84 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency? Lender2 EGYPT, ARAB REPUBLIC OF Ministry of About West Nubaria Intensification - Consultant services Project identification Agriculture 50.0 Intensify crop production, raise likely to be required. under way. (Bank) yields, and introduce oilseed crops in West Nubaria reclaimed lands. Misr Iran About Tourism Infrastructure - Provide Consultants have been Preparation under way. Development Bank; 50.0 infrastructure in key tourist areas appointed for project Ministry of (Bank) of the country comprising water preparation. Tourism sever and electricity, transportation and river docking facilities, access roads, and expansion of airport facilities. Prime Minister's About Structural Adjustment - Support of To be determined. Project identification Office 300.0 government reform program aimed to under way. (Bank) achieve growth and stabilization. Ministry of About (R) Integrated Horticultural Consultants likely to be Project activities Agriculture 16.0 Marketing - Support improvement in required. undertaken as part of (Bank) market infrastructure (grading, existing projects. packaging, pre-cooling etc.) and Further reporting will be institutions (product development, discontinued. quality control, market intelligence, international trade promotion) to strengthen domestic and export marketing. Mechanical and About Irrigation Pumping Rehabilitation II To be determined. Preparation under way. Electrical 45.0 - Rehabilitation or replacement of Department; (Bank) irrigation pumping stations, Ministry of provision of spare parts and Public Works and strengthening of O&M facilities. Water Resources Ministry of About Northern Sinai Agricultural To be determined. Project under preparation. Agriculture and 50.0 Development - As first phase of the (Co-financing would be Land Reclamation (Bank) agricultural development of Northern sought). Sinai, the project would expand the agricultural base of the country and include construction of irrigation and drainage works and provision of financial support to farmers for farm machinery and agricultural inputs. Ministry of About (R) Engineering and Technical Consultant services Negotiations scheduled for Education 40.0 Education - Support to the Ministry likely to be required. late August. (Bank) of Education for developing and (Cofinancing sought for strengthening secondary and post- technical assistance). secondary technical education, and for improving the quality and relevance of engineering education. Financing will be for equipment and technical assistance. Principal Bank 40.0 Agricultural Storage - Rehabilita- Consultants would be Approved by the Executive for Development (Bank) tion and construction of stores at required, including for Directors on May 25, 1989. and Agricultural selected locations (mainly) for design and construction Credit fertilizer, grains and animal feed, supervision. provision of handling equipment and improvement of storage and handling practices. - 85 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Imlementing Probable Action on Procurement Agency- Lender2 EGYPT, ARAB REPUBLIC OF (Cont'd) Egyptian Chemical About (R) Kima Fertilizer Industry Engineering firms would Appraisal report under Industries Co. 185.0 Restructuring - Likely to include be required to design and preparation. and General (Bank) balancing, modernization and help implement the (Co-financing is under Organization for replacement investments, technical project. consideration by USAID). Chemical assistance and training. Total Industries project cost about $413 million of which $283 million in foreign exchange. Egyptian 165.0 (R) Fourth Power - Power generation Consultants engaged for Approved by the Executive Electricity (Bank) - 1080MW combined cycle power preconstruction Directors on June 28, Authority (EEA) station (Delta region); conversion engineering services and 1989. to combined cycle of the existing preparation of bidding (Cofinancing approved by gas turbines at Mahmoudia and documents. African Development Bank Damanhour power stations; associated (about 124.0 million), power transmission facilities; Arab Fund for Economic and training, and technical assistance Social Development (about programs to increase EEA's operating $123.0 million), European efficiency, and engineering Investment Bank (about consultancy services. Total project $57.0 million), and cost about $848.5 million, of which Islamic Development Bank $696.0 million in foreign exchange. (about 15.0 million). Retroactive financing up to $400,000 provided. Egyptian General About (R) Gas Investment - Abuqir/NAF gas To be determined. Bank financing unlikely. Petroleum 200.0 development expansion, LPG Further reporting will be Corporation (Bank) processing and gas distribution. discontinued. (EGPC) River Transport 75.0 Inland Water Transportation - Consultants selected for Feasibility study has been Authority (RTA) (Bank) Rehabilitation of the Damietta-Cairo project preparation. revised to incorporate Branch of the Nile, including changes in project design. deepening of the branch, improvement and construction of river ports, Bank Project Preparation cargo handling equipment, Facility advance of navigational aids, and technical $500,000 approved to assistance, and improvement of finance consultant irrigation facilities. services for preparation of technical, financial and economic studies needed to determine the optimal phasing of the project. Supplementary financing for the second phase also being provided by UNDP. Ministry of 175.0 Agricultural Sector - To facilitate Consultants not expected Project in reserve status Agriculture and (Bank) adjustments in sector institutions to be required. pending agreement on a Land Reclamation and policies through financing macroeconomic reform imports of intermediate goods to program. meet agricultural sector needs. Ministry of About Railways III - To assist Government To be determined. Project preparation under Transport 75.0 in improving efficiency of railway way. (Bank) operations. - 86 - Member Country, Amount & Project3 Consulting Services Stage of Processing and Imlementing Probable Action on Procuremej Agency Lender2 EGYPT, ARAB REPUBLIC OF (Cont'd) Alexandria Water 36.0 Alexandria Water II - Rehabilitation Consultants required for Approved by Executive General Authority (Bank) of secondary networks, expansion of construction supervision, Directors on September 1 . main carriers, and distribution and assistance with 1988. (Cofinancing froa system, construction of reservoirs improvement of Government of Italy for and pumping station and provision of operational practices. $22.5 million for part a O&M equipment. Total project cost rehabilitation approved estimated at $102.5 million, of and with Federal Republi which $64.0 million in foreign of Germany $5.5 million I exchange. for technical assistance expected). HUNGARY To be determined About Structural Adjustment - Support for To be determined. Preparation under way in 200.0 program of policy reforms. coordination with the IMN (Bank) To be determined About (R) Telecommunications II - To be determined. Preparation under way. 100.0 Timeslice of telecoamunications Appraisal mission (Bank) sector investment program; build on tentatively scheduled foi institutional, financial and October. technical improvements initiated under Telecommunications I. To be determined About (R) Integrated Agricultural Business To be determined. Preparation under way. 100.0 - Loan to finance investments of, Appraisal mission (Bank) and technical support to, small tentatively scheduled fox farmers. October. To be determined About (R) Human Resources Technology To be determined. Preparation under way. 100.0 Development - Support for (Bank) institutional, policy and investment foundation initiated under Technology Development I and Development Sf Human Resources. National Bank of 65.0 (R) Financial System Modernization - Consultant services will Preparation under way. Hungary (Bank) To support the modernization of the be retained for various financial system and improve- its technical assistance Procurement: The ability to mobilize and allocate purposes. Government has-requested resources. retroactive financing amounting to US$3.5 million to cover costs of consulting services and goods for which expenditures are expected to be incurred before loar signing. National Bank of 95.0 (R) Transport II - Improve transport Consultants required for Loan was approved by the Hungary (Bank) efficiency and reduce cost; equip technical assistance. Executive Directors on rail recycling plant, purchase March 30, 1989, and signed equipment, complete first section on July 10, 1989. M-0 motorway, improve port and related technical assistance. To be determined 100.0 (R) Industrial Restructuring IV - To be determined. Preparation under way. (Bank) Loan to support development of the private sector, and small and medium enterprises. - 87 - Member Country,. Amount & Project3 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency Lender2 JORDAN Ministry of About Agricultural Sector Adjustment - To To be determined. Preparation mission Agriculture 100.0 facilitate agricultural policy scheduled for (Bank) reform and adjustments in sectoral September/October. institutions through financing imports to meet sectoral and economy-wide needs. Phosphate Mines About (R) Integrated Phosphate - To be determined. Appraisal report under Company (JPMC) 35.0 Beneficiation plant construction and preparation. (Bank) rehabilitation of fertilizer plant. (Cofinancing required). Total project cost about $165.0 million of which $115.0 million in foreign exchange. Ministry of About (R) Industry and Trade Adjustment To be determined. Appraisal report under Planning 100.0 Sector - Support a program of preparation. (Bank) reforms in the industry and trade (Co-financing likely to be areas. required). Retroactive financing being considered. Jordan 36.0 Telecommunications - Sector Consultants will be Approved by the Executive Telecommunica- (Bank) commercialization, institutional required for Directors on June 14, tions Corporation strengthening of telecommunication institutional 1988. All bids received. corporation (TCC) and financing high development, and sector priority components of sector's restructuring. Five-Year Plan. Water Authority About Water Supply, and Sewerage To be determined. Project preparation under of Jordan 30.0 Rehabilitation -. Technical way. (Bank) assistance to the Water Authority. Construction of water supply and sewerage systems. Rehabilitation of existing systems. Ministry of About (R) Health II - To assist Consultai'ts being Preparation mission Health 20.0 Government: (a) improve access to appointed. scheduled for August. (Bank) primary health care; (b) expand maternal child health and family planning services, and promote women's development activities; (c) improve sector administration and financing; (d) provide health sector staff training: and (e) rehabilitation of hospitals. To be determined About Transport III - Continuation of To be determined. Appraisal scheduled for 35.0 efforts started under Transport II, April/May 1990. (Bank) to strengthen sector institutions and policies and support of priority investments. Higher Council of About (R) Human Resources Development Consultants would be Approved by the Executive Science and 73.0 Sector Investment - To assist required. Directors on June 29, Technology (Bank) implementation of basic and 1989. secondary education reform- program. (Co-financing obtained Sector Investment Loan would provide from ODA, UK, and Japan's suppolrt for curriculum development, Overseas Economic teacher upgrading, instructional Cooperation Fund is likely mat'rials, school facilities, and to cofinance). vocational training. Retroactive financing of $3.0 million will be provide. - 88 - Member Country, Amount & Project3 Consulting Services Stage of Processing az and Im?lementing Probable Action on Procuremeni Agency Lender2 JORDAN (Cont'd) Jordan Valley 30.0 Al Wehdah (Unity) Dam - To secure To be determined. Project preparation under Authority (Bank) increased water resources in order way. (Cofinancing to intensify irrigated agriculture required). in Jordan Valley and provide additional supplies for municipal and industrial use in the Jordan Highlands. Also help strengthen related sector policies and institutions. MOROCCO Office National 125.0 (N) National Water Supply & Sewerage To be determined. Identification under way. de l'Eau Potable (Bank) - Regional water supply project for (ONEP) Settat province regions south of Atlas mountains. Ministry of 100.0 (R) Agriculture Sector Investment - To be determined. Identification under way. Agriculture (Bank) Expenditure financing tied to next phase of policy and institutional reform. Ministry of 150.0 (R) Large Scale Irrigation/Land Use To be determined. Preparation under way. Agriculture (Bank) Plan - Will complete the infrastructure rehabilitation and management restructuring of the Regional Offices for Agricultural Development. To be determined 200.0 (R) Second Public Enterprise Consultants not required. Identification under way. (Bank) Rationalization - Will support further policy and restructuring programs for public sector enterprises. Banque Nationale 100.0 Private Sector Development - Will To be determined. Identification under way. pour le (Bank) finance industrial investments and Developpement improvements in export facilities; Economique (BNDE) will follow up Industrial Finance Project. To be determined 200.0 SAL II - Support adjustment in the To be determined. Identification under way. (Bank) financial sector, ensure the efficient deployment of public investments and consolidate the return of the economy to sustainable growth. Office National 90.0 Rural Electrification - Rural To be determined. Preparation under way. de 1'Electricite (Bank) electrification of about 430 (ONE) villages with supply of electricity to about 145,000 domestic consumers. Traininge of Office National de 1'Electricite (ONE) staff. Ministry of 100.0 (R) Health Sector Support - To To be determined. Appraisal under way. Health (Bank) improve the efficiency of health services delivery through cost control and cost recovery, decentralization of administration of hospitals and other health services. - 89 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency Lender2 MOROCCO (Cont'd) Ministry of 70.0 Port Sector - Would support further To be determined. Identification under way. Equipment (Bank) development of port sector including container handling in Casablanca, bulk traffic in other ports and related institutional measures. To be determined 100.0 Secondary Education - Increase To be determined." Identification under way. (Bank) access to lower secondary level (grades 7-9) and selectively expand upper secondary level (grades 10-12). Ministry of About Fifth Highway - To improve Consultants will be Appraisal report under Public Works and 75.0 maintenance and the planning and required to assist in preparation. Ministry of (Bank) management of transport operations. strengthening planning Transport capabilities and improving safety. Banque de About FEC II - Policies, measures, and To be determined. Appraisal report under Developpement des 50.0 interventions to provide preparation. Collectivites (Bank) infrastructure in order to contain Locales and avoid unauthorized housing developments. Caisse Nationale 190.0 CNCA VII - Continued rationali- Consultants will be Approved by the Executive de Credit (Bank) zation of medium and long-term required for training. Directors on June 14, Agricole (CNCA) agricultural credit system serving 1989. private farmers and cooperatives, and small and medium-scale agroindustrial enterprises. Project may also assist in regionalization and expansion of rural banking activities. Credit Immobilier About (R) Housing Finance II - Line of Consultant services Negotiations completed. and Hotelier 80.5 credit to Credit Immobilier et likely to be required. Board presentation (Bank) Hotelier (CIH), and possibly other E: scheduled for September. financial institutions, to finance low-cost housing development. National About Agricultural Research and Extension Consultants will be Approved by the Executive Agricultural 28.0 - To reorganize and strengthen required for research and Directors on April 18, Research (Bank) national agricultural research and training. 1989. Institute; and establish an efficient national Ministry of extension service. Agriculture Office National 18.8 Petroleum Technical Assistance - Consultants likely to be Negotiations postponed at de Recherches et (Bank) Consultants' studies to serve a required. the request of government, d'Exploitations basis for continuing petroleum Petrolieres exploration promotion by ONAREP and (ONAREP) TA to assist ONAREP's restructuring. Banque Nationale About (R) Industrial Finance - Financing Consultant services may Negotiations postponed at de Developpement 120.0 of industrial investments and be required. the request of Government Economique (BNDE) (Bank) improvement in exporter facilities. and seven Follow-up of Industrial Export commercial banks Finance Project. - 90 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency Lender2 MOROCCO (Cont'd) Ministry of About (R) Forestry II - Cost effective Consultants will be Board presentation Agriculture 50.0 development of sector to safeguard required for preparation. scheduled for September (Bank) agricultural production, improve 12, 1989. productivity in rainfed areas and expand forestry resources base. Ministry of About Public Administration - Technical Consultants will be Approved by the Executive Finance 23.0 assistance training and the required for Directors on May 2, 1989. (Bank) provision of equipment to support implementation. implementation of SAL and other adjustment operations. Ministry of About Rural Primary Education - To improve Consultant services may Approved by the Executive Education 83.0 the delivery of basic education, be required. Directors on March 14, (Bank) expand enrollments in rural areas 1989. and promote extra budgetary (Cofinancing from African financing of basic education. Development Bank likely). PAKISTAN On-Farm Water About (R) Third On-Farm Water Management - Consulting services will Consultant's technical Management 50.0 Located in all four provinces be required for project proposals have been Directorates in (Bank) (Punjab, Sind, NWFP and Baluchistan) preparation and evaluated. Preparation Provincial and will involve watercourse implementation. mission scheduled for mid- Department of renovation, land levelling, surface September. Agriculture drainage, private tubewell (Co-financing of about (Punjab, Sind, operations and maintenance. US$25.0 million may be NWFP and Project will cover irrigation and required). Baluchistan) rainfed areas. Water and Power About Punjab (Saline) Drainage - Consultants appointed for Project preparation under Development 75.0 Subsurface and surface drainage, project preparation. way. Authority (Bank) canal remodelling, and on-farm water Consulting services will (Co-financing of about management in the 75,000 ha Fordwah- also be required for US$25.0 million may be Eastern Sadiqia (South) canal project implementation. required). command in Punjab Province. Agricultural About Agricultural Credit - Provide funds Consultancy services Appraisal mission in the Development Bank 150.0 for the institutional strengthening needed will be field. of Pakistan (Bank) of the rural financial credit identified. (ADBP) and delivery system represented by ADBP Nationalized and commercial banks. It would also Commercial Banks support the lending program of these institutions and of ADBP. Government of About Agriculture Environmental Sector - Consulting firm being Project preparation under Pakistan - 50.0 Protection and management of identified. way. Ministry of Food, (IDA) environmental resources in Pakistan. Agriculture and Cooperatives National Housing About Shelter for Low-Income Communities - Consultants will be Project identification Authority 40.0 Upgrade shelter and basic urban required for project under way. Funds required together with (Bank) services for squatter Katchi Abadi design and management. for preparation. respective 30.0 connunities. National land and (Co-financing of up to Provincial (IDA) shelter development in urban and $200 million is required Governments high density rural areas and housing for implementation). finance. Land tenure and user fees for services to be addressed. - 91- ember Country, Amount & Project3 - Consulting Services Stage of Processing and and Im?lementing Probable Action on Procurement4 Agency Lender2 PAKISTAN (Cont'd) Water and Power About (R) Rural Electrification - The Consultants will be Appraisal report under Development 123.0 project will electrify about 8400 required. preparation. Authority (Bank) villages and would connect to 37.0 WAPDA's system about 3 million (IDA) domestic, industrial and commercial rural consumers and about 30,000 tubewells. Water and Power About Kalabagh Dam - Dam construction and Project feasibility, Project engineering study Development 150.0 installation of initial 2400 mw detailed designs, and was completed December Authority (Bank) hydro capacity to be expanded to tender documents 1988 as scheduled under 3600 mw. completed by consultants. UNDP financing with World Bank as executing agency. Government of About Sind Urban Development - To Consultants being Project preparation under Sind (GOS) 20.0 strengthen planning, financial and selected to carry out way. (Bank) managerial practices of provincial studies for project 30.0 governments; to finance priority preparation. UNDP (IDA) sub-projects presented by municipal funding for project governments according to criteria to preparation consultancy be agreed during project on secondary cities has preparation. been approved. Government of 250.0 Energy Sector II - To continue the Consultants Will be Loan approved by the Pakistan Planning (Bank) program of reforms in pricing required for Executive Directors on land Development policies, investment programming and implementation. June 29, 1989. Department; Water institutional development started and Power under the First Energy Sector Loan. Procurement: Government Development has reouested 10% of the 1Authority; US$125.0 million IKarachi Investment Component Electricity (US$12.5 million) to Supply Corp.; Oil retroactively finance and Gas payments incurred for Development equipment and materials Corp.; Southern since September 1, 1989. Gas Co. Ltd.: Disbursements amounting to Pakistan Mineral about 20% of the US$125.0 Development million Adjustment Corp.; Sui Component (US$25 million) Northern Gas is also expected to Pipeline Ltd. retroactively finance general imports since May 1. 1989 (excluding imports of items covered under the negative list). - 92 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Imylementing Probable Action on Procurement4 Agency Lender PAKISTAN (Cont'd) Civil Aviation About Transport Sector/Railway - To Consultants will be Appraisal mission Authority; 200.0 support a program of policy reforms, required. tentatively scheduled fo3 Karachi Port (Bank) investment, institutional and September. Trust; Ministry organizational reform, and training of Communica- in the transport sector. tions; Ministry of Railways; National Highways Board; Pakistan Railways Planning and Development; Ports and Shipping; Port Qasim Authority Ministry of 30.0 Family Health - To improve health Consultants likely to be Preparation under way. Health (IDA) care especially for mothers and needed for preparation children (including family and execution. planning), to assist with manpower development and with institutional strengthening. Karachi Port About (R) Karachi Port Modernization - (a) Consultants will be Appraisal report Trust (KPT) 103.0 construction of quay side pavements, required for second stage completed. (Bank) a new oil terminal replacing two computerization of KPT outdated ones, and new land side feasibility study for a Procurement: approach roundabout (Jinnah Bridge Dedicated Container Prequalification for oil Phase II); (b) procurement of a new Terminal and radar for terminal ($22 million), dredger, cargo handling equipment, the Port as well as for Jinnah Bridge Phase II computers and spare parts; and (c) KPT reorganization. ($27 million), Dredging training. Plant ($18 million) and Consultants for the mobile cranes ($13 Container Terminal Study million). are being invited to express interest on the Tender documents for fou basis of which KPT will project components being prepare short list. reviewed by the Bank. Tenders expected to be distributed to prequalified bidders in July 1989. (PPF advance ($0.3 million) and an addition $0.3 million approved). Design and other preparatory work is considered to be finance from Technical Assistanc Credit instead of retroactive financing an appropriate action has already been initiated. Sui Northern Gas About (R) Privatization of SNGPL - Consultants may be Negotiations tentatively Pipeline Ltd. 100.0 Establishment of a framework for the required for preparation scheduled for July 31. (SNGPL) (Bank) privatization of SNGPL expansion of and/or Implementation. the transmission and distribution Procurement: Borrower h systems, installation of a gas requested retroactive purification plant and a financing amounting to telecommunications system. US$9.0 million to cover payments on advance contracting for heavy construction equipment. - 93 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency Lender PAKISTAN (Cont'd) Agricultural About (R) Agricultural Research II - To Consultants will be Negotiations scheduled for Research Council, 55.0 improve provincial agricultural required for October. Provincial (IDA) research capability, and to continue implementation. Agricultural and consolidate the improvements Research made at the Pakistan Agricultural Institutes Research Council under the Agricultural Research I Project. Sind Education About (R) Sind Primary Education Consultants likely to be Preparation under way. Department 100.0 Development Program (formerly needed for preparation Appraisal mission (IDA) Education Sector Policy) - Focus on and execution. scheduled for September. expansion and improvement of primary education in Sind and access for (Co-financing being female students. discussed with Norwegian government). Retroactive financing likely. Oil and Gas About (R) Domestic Energy Development - Consultants likely to be Preparation under way. Development 160.0 (a) development of the Dhodak required for preparation Corporation; Sui (Bank) condensate gas field; (b) and execution. Southern Gas infrastructural development of SSGC Company (SSGC); through expanding and reinforcing of Water & Power its transmission and distribution Development network; (c) construction of a Authority and petroleum product pipeline to carry Pakistan State fuel oil from Karachi port to the Oil Company Hab River power plant and (d) consultancy services for studies. Provincial About (R) Rural Water - To assist Consultants have been Preparation mission in the Governments of 30.0 Government of Pakistan in selected for project field. Sind, Punjab, (Bank) implementing provincial programs to preparation. Baluchistan and 90.0 provide safe drinking water and NWFP (IDA) sanitation services to rural areas; to strengthen planning, operations and maintenance, cost recovery, hygiene education and institutional development. Government of About (R) Micro-Enterprises - Line of To be determined. Preparation under way. Pakistan 80.0 credit to support development of Pre-appraisal mission (Bank) micro-enterprises and technical tentatively scheduled for assistance for extension services; early 1990. major objective is employment generation, poverty alleviation, improve integration of formal and informal financial markets. To be determined About (R) Industry and Trade Adjustment - To be determined. Project preparation under 150.0 Policy adjustment loan to promote way. (Bank) further reforms aimed at improving industrial and financial sector efficiency. -94, - Member Country, Amount & Project3 Consulting Services Stage of Processing and and ImProbable Action on Procurement4 andImlement ihg Poal Agency Lender2 POLAND National Bank of 250.0 Industrial Export Development - To Consultants have been Appraisal report under Poland (NBP) (Bank) assist in modernization and retained to assist NBP in preparation. expansion of selected export- setting up systems to oriented industrial enterprises in manage/administer sub- A project preparation chemical, electro-engineering and loans and, studies to facility advance of up tc wood-based industries, line of evaluate subsectoral $1.5 million has been credit for smaller investments, in restructuring prospects. approved to finance other industrial enterprises and consultants. technical assistance. Total project cost about $442.0 million, of which Procurement: Government about $258.0 million is in foreign , request is under exchange. consideration for retroactive financing of $25 million to cover some consultants services and industrial equipment for which Government has provided bridge financing National Bank of 50.0 Agricultural Industries Export Consultants may be Appraisal report under Poland (NBP) (Bank) Development - To assist in required to assist in preparation. rehabilitation, modernization and establishing appropriate expansion of existing agricultural marketing arrangements. processing industries to generate incremental export earnings. Total project cost about $80.0 million, of which about $50.0 million in foreign exchange. National Bank of About Energy Resource Development - To Consultants may be Appraisal report under Poland (NBP) 250.0 increase operating efficiency in the required to study least- preparation. (Cofinancin (Bank) coal and gas sectors and maintain cost solutions to may be required). coal exports to convertible currency pollution control markets through increased investments, and carry production. Total project cost out other environmental about $400.0 million. and financial studies. PORTUGAL Ministry of About Forestry II - Afforestation program To be determined. Project preparation under Agriculture 30.0 including regeneration, pasture way. (Bank) development, wild life management and forestry research. Ministry of About Tras-os-Montes Regional Development Consultants may be Loan approved by the Agriculture 90.0 - Agricultural development and required to prepare Executive Directors on (Bank) improvement in agricultural designs for irrigation April 11, 1989. productivity of Tras-Os-Montes schemes and to carry out . region focusing on rural various studies. infrastructure, small-scale irrigation, agricultural extension credit and research to facilitate sector transition into EC Common Agricultural Policies. Total project cost about $415 million. Ministry of About Education Sector - Higher education To be determined. Project preparation under Education 100.0 loan to promote institutional way. (Bank) reform, and sector role in economic development and cost recovery. - 95 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Imlementing Probable Action on Procurement4 Agencyl Lender2 TUNISIA To be determined 80.0 Industrial Finance - Financial and To be determined. Identification under way. (Bank) technical assistance to restructure priority industrial subsectors both publicly and privately held for institutional reform or industrial and export promotion activities and to help define the role of Government in the industrial sector. Societe Nationale 50.0 Eighth Water Supply - Increasing To be determined. Identification under way. d'Exploitation et (Bank) the involvement of SONEDE in rural de Distribution areas, and optimization of existing des Eaux (SONEDE) investments by rehabilitating, construction of private connections and increasing raw water production facilities; and expanding water supply facilities of Gabes city. Agence pour la 60.0 Energy Conservation and Consultants required for Preparation under way. Maitrise de (Bank) Diversification - Reduction in the engineering services to l'Energie (AME) cost of energy consumption and be used in the evaluation support of policy changes and of energy savings financing investments in: (a) energy potential. efficiency, (b) power system efficiency, (c) natural gas system expansion; and (d) co-generation. National Bank of 50.0 Fifth Agriculture - The loan Consultants required for Identification under way. Tunisia (BNT) (Bank) supports a new three-year time slice training specialists and of the National Bank of Tunisia's institution building. (BNT) activities to provide financing for its agricultural credit operations and project related training. To be determined 20.0 Employment Conversion Fund - The To be determined. Identification under way. (Bank) project seeks to: (a) encourage the processing of labor market adjustment with a view to increase its flexibility and improve its responsibility to the needs of the economy; (b) to promote youth employment; and (c) to facilitate redeployment of displaced workers through regional and local initiatives and incentives and institutional building. Ministere de 30.0 Rural Roads - The project would Consultants required for Identification under way. 1'Equipement et (Bank) consolidate efforts made under technical assistance in de l'Habitat/ previous rural roads programs and the areas of highway Transports would strengthen arrangements for maintenance and adequate maintenance. It would also agriculture. finance road improvements, road maintenance and maintenance equipment. Minisere-de 80.0 Transport Maintenance -- To be determined. Identification under way. l'Equipemen et ank Rehabilitation and maintenance of de l'Habitat/ transport facilities to be Transports identified. - 96 - Member Country, Amount & Projectd Consulting Services Stage of Processing and and ImTlementing Probable Action on Procurement Agency Lender2 TUNISIA (Cont'd) Ministries of 95.0 (R) Education, Training and Consultants likely to be Approved by the Executk Education and (Bank) Employment Sector - Assistance to required for Directors on May 11, 19 Social Affairs the Government's education and institutional development Loan signed on June 30, training reform program with key assistance. 1989. policy actions related to education and training. Retroactive financing fa $4.0 million recommendet Ministry of About Municipal Development - Improvement To be determined. Preparation under way b] Interior 50.0 of municipal finance and management. Government. (Bank) Directorate 130.0 (R) Public Enterprises - Assistance To be determined. Approved by the ExecutiN General of Public (Bank) to the government's program to Directors on July 11, Enterprises improve the efficiency of Public 1989. Enterprise sector and selected public enterprises through key policy actions-and technical assistance. Ministries of 84.0 (R) Second Agricultural Sector To be determined. Approved by the Executiv Planning and (Bank) Adjustment - Agricultural import Directors on June 1, 198 Agriculture financing tied to second phase of Loan signed on June 30, policy/and institutional reform. 1989. Ministry of 58.0 (R) Fifth Urban - Line of credit to Consultants likely to be Approved by the Executiv, Public Works and (Bank) Caisse Nationale d'Epargne Logement required for Directors on May 18, 198 Housing and modernization of land institutional development Loan signed on June 30, information system. assistance. 1989. Ministry of About (R) Research and Extension - Support Consultants will be Negotiations scheduled f< Agriculture and 14.0 to research and extension activities required for technical August. Agricultural (Bank) in agriculture. assistance component. Production Ministry of About Health and Population II - Expansion Consultants required for Preparation under way. Health 50.0 of population/family planning study on health financing (Bank) programs, and improvement and system. rehabilitation of health service delivery system. TURKEY Turkish About (N) Transmission - The project will: Consultants will be Project preparation under Electricity 350.0 (a) construct about 1300 km of extra required for preparation way. Authority (TEK) (Bank) high voltage power transmission and implementation. lines of 400 kV to connect the Eastern Generation Pool to Western Load Centers; (b) construct, install and extend various new and old 400 kV and 154 kV substations. External Economic About (R) Industrial Export Development II To be determined. Appraisal mission Affairs; 200.0 - To assist government in its export scheduled for October. Industrial (Bank) drive. The project would provide Investment Credit long-term investment funds to Bank; Industrial private export-oriented industries Development Bank through a network of financial of Turkey institutions. - 97 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Imylementing Probable Action on Procurement4 Agency Lender2 TURKEY (Cont'd) Ministry of About Science and Technology Development - To be determined. Preparation mission Science & 200.0 To upgrade Turkey's technological scheduled for October. Technology, (Bank) capacity including the scientific Council for and technological human resource Higher Education base and thereby enable the country (YoK), State to increase its export Planning competitiveness. Organization To be determined About (R) Industrial Sector Adjustment - To be determined. Preparation completed. 200.0 Project will support the Pre-appraisal mission (Bank) restructuring and revitalization of scheduled for October. key industries to ensure adjustment to the liberalization program. Agricultural Bank 250.0 (R) Agriculture Credit III - Consultants for Approved by the Executive of Turkey (Bank) Strengthening of agricultural credit improvement of Management Directors on June 15, institutions and further Information Services, 1989. Loan signed on June rationalization of sector policies. Monitoring and Evaluation 28, 1989. and Human Resource Management. Ministry of About (R) Agricultural Extension II - To be determined. Appraisal report under Agriculture 50.0 Improvement of extension and other preparation.. (Bank) technical services in priority provinces. To be determined About Agricultural Sector Adjustment II - To be determined. Timing dependent upon 200.0 Support for agricultural sector progress on discussion to (Bank) policy reforms. be held with Government on Agriculture Sector Report. To be determined About Drainage and On-Farm Development II To be determined. Timing dependent on 100.0 - Completion of second timeslice of progress of Drainage and (Bank) core program for eliminating backlog On-farm Development I. of drainage and other on-farm works on ongoing or completed general directorate for state hydraulic works projects. To be determined About Agricultural Research - Civil works, To be determined. Study financed under 100.0 equipment and fellowships to assist Agricultural Sector (Bank) in strengthening Turkey's Adjustment Loan to assist agricultural research system. Government in designing research improvement requirements. Ministry of 75.0 (R) Health I - To improve health Consultants will be Loan approved by the Health (Bank) conditions in underprivileged required for development Executive Directors on May provinces, strengthen national of a Management 11, 1989. health programs and support Information System and institutional development. applied studies. Ministry of About (R) Southwest Coast Sewerage - Consultants required for Preparation under way. Tourism 150.0 Sewerage and sewage treatment and project preparation (Bank) disposal facilities, water supply assistance during 1989, facilities and training and and for subsequent technical assistance for selected detailed design, locations along the country's construction supervision, southwestern Mediterranean and and other technical Aegean Coasts. assistance. - 98 - Member Country, Amount & ProjectJ Consulting Services Stage of Processing an and Imylementing Probable Action on Procurement Agency Lender2 TURKEY (Cont'd) Tb-be-determined About Transport Sector Adjustment - The To be determined. Preparation under way. -150.0 program would support policy reform (Bank) including review of the motorway program, reassessment of the balance between road and investment and maintenance improvement of the operations and finances of the railways. Four 204.5 (R) Small and Medium-Scale To be determined. Approved by the Executi participating (Bank) Industries II - To continue support Directors on May 23, 19 credit for small industries through the Loan signed on June 28, institutions and delivery of financial services and 1989. several private strengthening of technical and and public sector marketing institutions. institutions Several 150.0 (R) Agro-Industry - To finance Consultants to assist Loan approved by the participating (Bank) investments for rationalization/ credit institutions in Executive Directors on I Credit rehabilitation of agro-industry subproject appraisal, 30, 1989 and signed on Institutions enterprises and to support prepare a fisheries June 28, 1989. (including TCZB, Government's efforts to improve development survey, and Halk Bank, SYKB), sectoral performance. carry out a marketing the Ministry of training program. Agriculture, and an export training institution Ministry of About (R) General Education I - Would To be determined. Appraisal mission Education and 100.0 assist the Government in a program tentatively scheduled fo Council for (Bank) approach toward improving the October. Higher Education quality accessibility and efficiency (YoK) of education through special MOE and YoK development actions in the program areas of: (a) curriculum and materials, (b) facilities and equipment, (c) teacher education, and (d) education administration and management. Ankara WS&S About Ankara Sewerage - Collectors for Consultants required for Appraisal report under General 175.0 sewage and drainage; sewerage detailed design, preparation. (Co-financii Directorate (Bank) rehabilitation; sewage treatment construction supervision, is expected from (ASKI) plant; technical assistance and and other technical Kreditanstalt fur training. assistance. Wiederaufbau (KFW). YEMEN ARAB REPUBLIC Ministry of About Agriculture Sector Development II - Consultancy services will Preparation mission Agriculture and 12.0 National land and water resources be required. scheduled for January Fisheries (IDA) conservation focussed on improving 1990. efficiency of irrigation and forestry sub-sectors. Ministry of About National Agriculture Development I - Consultants will be Appraisal mission Agriculture and 15.0 Institution support for central required to assist in tentatively scheduled for Fisheries (IDA) Ministry; consolidating agricultural implementation. October. research, coordinating training and extension, and strengthening Planning Department. - 99 - Member Country, Amount & Projecti Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency Lender c YEMEN ARAB REPUBLIC (Cont'd) Ministry of About (R) Industrial Investment - Consultants likely to be Appraisal report under Economy, Supply 15.0 Technical assistance for industrial required to assist in preparation. and Trade, and (IDA) planning and for extension service implementation. (Co-financing being Industrial Bank to small and medium-scale sought). of Yemen enterprises, and a line of credit for industrial investment. Ministry of About (R) First Transport - (a) Consultants to be Project preparation under Transport and 10.0 construction of Hajja-A1 Khushm road required for supervision way with financing Public Works (IDA) (62 km); (b) supervision of of construction, provided under Seventh construction; (c) technical technical assistance, Highway Project. assistance and training to training and preparation (Co-financing may be strengthen productivity in ports, of studies. required). civil aviation and road subsectors; (d) establishment of a maintenance system for civil aviation facilities; and (e) studies. Yemeni General About (R) Power Distribution V - Likely to Consultants will be Project preparation under Electricity 20.0 include: (a) a rural required to supervise way. (Cofinancing being Corporation (IDA) electrification component to connect construction. arranged). (YGEC) 50.0 to Yemen General Electric (Bank) Corporation's (YGEC's) system about 81,000 new consumers; (b) rehabilitation of YGEC's substations, transmission and distribution lines in the major urban areas and provision of capacitors for line loss reduction in these areas; and (c) technical assistance and training. Total project cost about $144.0 million of which $123.0 million in foreign exchange. Ministry of About Urban III - Stormwater drainage and Consultants have been Project preparation Municipalities 15.0 partial upgrading of Old City of recruited and are completed. and Housing (MMH) (IDA) Taiz. Total project cost estimated assisting in project (Cofinancing may be at $45.0 million, of which $21.0 preparation. required). million in foreign exchange. Project will likely be phased. Ministry of About Health II - The project would Consultants for public Pre-appraisal scheduled Health 15.0 increase the quality and coverage of health care operation, for mid-October. (IDA) health services, including "familiy institutional development welfare" by improving planning, and information, financing and administration of education and health services and by expanding communication/population health manpower training, and education have been logistics support system. identified. Ministry of Civil 10.8 (R) Institutional Development for Consultants in various Approved by the Executive Service and (IDA) Public Administration - Improvement public administration Directors on May 12, 1989 Administrative of the administrative and planning specializations will be PPF advance of $400,000 Reform capabilities of the Ministry of required for technical approved to finance Civil Service and Administrative assistance. studies, consultants and Reform and Development of the fellowships. National Institute for Public Administration. -100- Member Country, Amount & Projecti Consulting Services-- Stage of Processing and and Imylementing Probable Action on Procurement4 Agency Lender2 YEMEN ARAB REPUBLIC (Cont'd) National Water About Taiz Water Resources Development & Evaluation of tender for Project preparation under and Sewerage 13.0 Network Rehabilitation - Provision consultant required for way. Project Preparation Authority (IDA) of water production works and engineering and detailed Facility advance of rehabilitation of water and sewerage design of water $1,500,000 approved to networks. production works, finance studies for studies, technical emergency water assistance and training production, expansion, ant under way. hydraulic analysis. YEMEN, PEOPLE'S DEMOCRATIC REPUBLIC OF Ministry of 10.0 (R) Flood Emergency Assistance - To be determined. Appraisal mission Housing and (IDA) Flood repair and protection works in scheduled for September. Construction the housing, education, agriculture and health sectors. Public Water About (R) Tarim Water Supply - Consulting services will Appraisal mission Corporation 12.0 Construction of a new borefield be required for scheduled for September. (IDA) distribution system and reservoirs construction supervision including a pilot sewerage system. and technical assistance. Ministry of About (R) Fisheries IV - Project would Consultant services will Appraisal tentatively Fishwealth 12.0 assist government to develop coastal be required for technical scheduled for October. (IDA) fishing operations including assistance, training and (Co-financing likely from strengthening marketing detailed design of shore IFAD). institutions; assisting design and facilities. construction of fishing boats and importing selected vessels; developing credit facilities; constructing related village infrastructure; and financing transport equipment and infrastructure for marketing of fish. Public About (R) Power III - Improving efficiency Consultants completed Appraisal report under Corporation for 12.0 of electric network through: (a) feasibility study. preparation. Electric Power (IDA) rehabilitation of Aden system Consultants required for (Cofinancing may be including loss reduction and Phase I detailed engineering required). of network control center network design, supervise facilities; (b) loss reduction in construction management, Wadi Hadramawt branch; (c) technical and other technical assistance for planning, financial __ assistance. management, and training. Total project cost about $18.0 million, of which about $15.5 million in foreign exchange. Ministry of 12.0 (R) Hadramawt Agriculture III - Consultants will be Approved by the Executive Agriculture (IDA) Consolidation and expansion of required for design and Directors on June 22, agricultural development including construction of 1989. spate and tubewell irrigation in irrigation works and (Co-financing agreed with Wadi Hadramawt. strengthening Kuwait Fund and Arab agricultural operations. Fund). - 101 - Member Country, Amount & Project0 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency Lender2 YUGOSLAVIA To be determined About (N) Financial Sector - To support To be determined. Project identification and 250.0 policy measures and restructuring of timing dependent upon (Bank) financial sector. progress on discussions to be held with Government on Financial Sector Review Report currently under preparation. Road About Highway Sector III - Financing of To be determined. Awaiting government Organizations of 265.0 two-year time-slice (1990-1991) of confirmation on timing of all 8 Republics (Bank) investment programs of road negotiations. and Provinces of organizations in all eight Yugoslavia; Republics/Provinces. Procurement: Request is Federal under consideration for Association of retroactive financing of Road $10 million to cover civil Organizations of works. Yugoslavia Railway About Railways VII - Time-slice Consultants required for: Loan approved by the Organizations of 138.0 (1989-1991) of investment plans for (a) rail transit traffic Executive Directors on May Croatia, Serbia, (Bank) four railway transport organizations study; and (b) staff 23, 1989. Slovenia, directed at removing capacity training for introduction Vojvodina constraints of the main trunk line, of an information system. Retroactive financing and improving operating amounting to $13.8 million efficiencies. to cover civil works is approved. ? Hidroelektrane na About Power (Buk Bijela) - Construction of Local consultants already Preparation under way. Drini 200.0 power plant on Drina River and employed. (Bank) related transmission facilities. To be determined About Power - Construction of hydropower Consultants required to Project preparation under 150.0 plant project on Moraca River and review preliminary design way. (Bank) related transmission facilities. of dams. Jugobanka, UBB, About Export Industries I - Multi-republic Consultants required for Loan approved by the Ljubljanska Banka 120.0 line of credit for selected export- development of export Executive Directors on (Bank) oriented industries, administration system, June 29, 1988. export marketing and project appraisal capability. To be determined About Export Industries II - Second multi- Consultants required for Project identification 150.0 republic line of credit for export- development of export under way. (Bank) oriented industries. administration system, export marketing and project appraisal capability. Istrian Water About Istria and Slovene Coast Water Consultants required to Loan approved by the Works, Pula Water 60.0 Supply and Sewerage - Construction complete final design and Executive Directors on May Works, Rizana (Bank) of water treatment and transmission to prepare Water 23, 1989. Water Works facilities in Istria and the Slovene Pollution Control Master Coast. Plan. Retroactive financing for an amount of $2.0 million to cover civil works costs is approved. - 102 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and I lementing Probable Action on Procurement4 Agency? Lender2 YUGOSLAVIA (Cont'd) National Bank of About (R) Second Structural Adjustment - To be determined. Negotiations tentatively Yugoslavia 300.0 To support the Government's scheduled for September. (Bank) adjustment program focusing on key policy areas. -103 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Imlementing Probable Action on Procurement4 Agency Lender2 IV. LATIN AMERICA AND CARIBBEAN REGION ARGENTINA National 100.0 Road Maintenance - Avoidance of: To be determined. Project preparation under Directorate of (Bank) (i) costly road repair and way. Highways (DNV) reconstruction; and (ii) unnecessary increases in vehicle operations cost. Improvement of coordination and cooperation between agencies (national and provincial). Improvement of road activity funding. Ministry of 150.0 Agricultural Export Development - To be determined. Project preparation under Economy (Bank) The project would promote non- way. traditional agricultural exports; support service infrastructure in marketing, animal health and plant protection; and provide a complementary line of credit for small/medium scale exporters of processed agricultural projects. Ministry of 84.0 Health I - Support structural Consultants will be Appraisal report under Health and Social (Bank) reforms in health. required. preparation. Welfare Retroactive financing of $5.0 million is being proposed. To be determined 250.0 Provincial Development - To be determined. Preparation mission in the (Bank) Strengthening through improving field. financial performance of provincial Government. Reduction of provincial deficits through improved revenue performance and expenditure efficiency. Secretariat of 350.0 (R) Electric Power II - Implementa- To be determined. Appraisal mission Energy (Bank) tion of sector institutional reform scheduled for November. and consolidation of financial rehabilitation. Procurement: The civil work contract for YACYRETA, awarded under a previous loan would likely be financed. Banco Central de 400.0 Banking Sector Reform I - Support to Consultant will be Amendment to the Loan was la Republica (Bank) the first phase of structural reform required for technical approved by the Executive Argentina (BCRA) in the financial sector. assistance in the area of Directors on October 27, banking supervision. 1988. Signing pending. Banco Hipotecario 250.0 (R) Bank Restructuring I - To be determined. Project preparation under Nacional (BEN) (Bank) Restructure Banco Hipotecario way. Nacional (BEN) and possibly other public banks such as Banade and Banco Provincia de Buenos Aires (BPBA) to reduce their heavy dependence on the Central Bank and to establish financial autonomy within the financial sector. - 104 - Member Country, Amount & Project3 Consulting Services Stage of Processing an and Imlementing Probable Action on Procurement' Agency Lender2 ARGENTINA (Cont'd) Ministry of 350.0 Public Enterprise Rationalization - Consultant services will Appraisal mission Economy (Bank) Framework for privatization and be required. tentatively scheduled for demonopolization; restructuring of September. public enterprises: multi-year investment planning. Banco Central de 240.0 (R) Industrial Finance (IFL) - Consultants will be Project preparation under la Republica (Bank) Provide term financing for required. way. Argentina investment at international (Co-financing for the competitive rates and help the technical assistance government advance trade and component has been industrial policy reforms. approved under the Japanese Grant Facility). Ministry of 300.0 Grain Marketing - Institutional To be determined. Project preparation under Economy (Bank) support and investment financing for way. development of non-traditional agricultural exports. Consejo Federal 112.0 Water Supply II - Water supply and Consultants will be Further loan processing de Agua Potable y (Bank) sewerage sector project. Project required for conditional upon agreement Saneamiento will finance institutional commercialization, on project financing plan. (COFAPYS) development, commercialization project evaluation, (Cofinancing being sought investments, training, financial management. from IDB). rehabilitation and operational improvements, water supply and sewerage system capacity increases, and feasibility studies and designs. To be determined Up to Municipal Development II - Extension Consultant services will Project preparation 150.0 of the first project. be required for project conditional upon (Bank) implementation. implementation of first project. IBARBADOS Central Bank 10.4 Export Development - Line of Credit. To be determined. Project preparation under (Bank) way. Ministry of Works 12.0 Road Maintenance & Rehabilitation - To be determined. Project preparation under (Bank) Financing of a 5-year rehabilitation way. plan, safety program, technical assistance and training. A feeder road component also under consideration. BOLIVIA Ministry of 20.0 (R) Agricultural Development - Consultants have been Preparation mission Agriculture (IDA) Develop agricultural and livestock recruited for preparation scheduled for mid- products for export and/or import work. November. substitution. Include technical assistance component for institutional strengthening of executing agencies. Emergency Social 25.0 (R) Social Investment Fund (formerly To be determined. Project preparation under Fund (IDA) Emergency Social Fund III) - way. Continuation of Emergency Fund Program to address social impact of adjustment and facilitate transition to medium term social development program. -105- Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im?lementing 2 Probable Action on Procurement4 Agency Lender BOLIVIA (Cont'd) Ministry of 35.0 (R) Eastern Lowlands Regional Soil and satellite Appraisal report under Agriculture and (IDA) Development - Support for long term imaging experts and preparation. CORDECRUZ regional development of the eastern resource economists have lowlands focusing on the protection been contracted to Retroactive financing to of the region's natural resources complete project July 1. 1989 of up to 10% and on the production of preparation. Additional of the Credit expected to agricultural export commodities; consultants will be be included in the support for soil studies and required during project project. mapping, agricultural research and implementation. extension, feeder road rehabilitation and credit. Ministry of 35.0 Mining Sector - Support for Consulting services Credit approved by the Mines/Comibol (IDA) implementation of mining sector required for implementa- Executive Directors on May program. tion of Comibol and 11, 1989. institutional restructuring components. Central 15.0 (R) Private Enterprise Development - To be determined. Negotiations scheduled for Bank/Ministry of (IDA) Credit for development of small and late September. Industry medium sized enterprises, including technical assistance for development of entrepreneurial, managerial and administrative capacity. Operation will also include a component specifically targeted at women. Ministry of 37.0 Export Corridor Development - Consultants needed for Credit approved by the Transportation (IDA) Rehabilitation and upgrading of transport planning, Executive Directors on May roads and railroads, including road railway management and 11, 1989. construction in Bolivia's export marketing, road corridors to both the Atlantic and maintenance and Retroactive financing of Pacific and relevant technical intermodal freight up to 10% of credit is assistance. transport. contemplated for expenditures incurred after June 15, 1988. Ministry of 20.0 Integrated Health Development - Consultants financed Appraisal report under Health (IDA) Strengthening of the integrated under PPF to carry out preparation. health care services in the three project preparation largest cities; technical assistance studies in connection Retroactive financing of for institutional strengthening of with rehabilitation and up to 10% of the Credit is the Ministry of Health and its equipping of selected contemplated for decentralized units, and health centers. expenditures incurred coordination with non-governmental after April 1989. organizations. Nutrition fortification interventions nation- wide. Water Utilities 20.0 Water Supply and Sewerage C - To be determined. Appraisal mission of La Paz, Santa (IDA) Operational, institutional and scheduled for September. Cruz and financial strengthening of water Cochabamba supply and sewerage systems in major cities - Santa Cruz, Cochabamba and possibly La Paz. - 106 - Member Country, Amount & Project3 Consulting Services Stage of Processing an and Imylementing Probable Action an Procurement Agency Lender2 BRAZIL Petroleo Up to (N) Energy Transport - Assistance to To be determined. Project preparation under Brasileiro S.A. 200.0 PETROBRAS to develop: (i) high way. (PETROBRAS) (Bank) priority product distribution projects; (ii) automation programs Retroactive financing up to reduce losses and for more to US$20.0 million would efficient energy utilization and be considered to finance environmental control; and (iii) uriently needed works. technical assistance in areas such as transportation planning. (CHESF) Compania Up to (N) Itaparica Supplemental - To To be determined. Project preparation under Hidro Electrica 175.0 provide supplementary financing to way. do San Francisco (Bank) complete works for irrigation and social facilities for the Itaparica Resettlement and Irrigation Project. Secretaria de Up to (N) Land Management III of Sao Paulo To be determined. Project preparation under Agricultura e 100.0 - To generate sustainable way. Abastecimento (Bank) productivity gains through improved land management and soil conservation within about 2,000 microcatchments involving 120,000 farmers in Sao Paulo. Banco de 100.0 Municipal Development in Rio Grande To be determined. This project has been Desenvolvimento (Bank) do Sul - To support municipal prepared jointly with the do Estado do Rio development program focused on a Municipal Development Grande do Sul statewide strengthening of financial project for the State of (BADESUL) management and administration in the Parana. Further State of Rio Grande do Sul. processing had been delayed at the request of the Government. Negotiations tentatively scheduled for September. Procurement: Retroactive financing for US$5.0 million beins considered for services and goods. Companhia de 70.0 Water Sector in the State of Parana To be determined. This project has been Saneamento do (Bank) - To provide financing for extending prepared jointly with the Parana (SANEPAR) water and sewerage services in the Water Sector Project in State of Parana and help strengthen the State of Sao Paulo. state policies and institutions. Further processing had been delayed at the request of the Government. Negotiations tentatively scheduled for September. Secretaria de 100.0 Municipal Development - Support for To be determined. Approved by the Executive Estado de (Bank) municipal development program Directors on June 22, Desenvolvimento focused on a statewide strengthening 1989. Urbano (Parana) of financial management and administration in the state of Procurement: Retroactive Parana. financing of US$5.0 million approved for services and goods. Central Bank of Up to (R) State Bank Reform - Assist To be determined. Preparation preparation Brazil 200.0 participating state governments to under way. (Bank) restructure their state banking institutions. - 107 - 4ember Country, Amount & Project3 Consulting Services Stage of Processing and ind Im lementing Probable Action on Procurement4 Lgency- Lender2 IRAZIL (Cont'd) Companhia de 280.0 (R) Water Sector Project in the To be determined. Approved by the Executive Ianeamento Basico (Bank) State of Sao Paulo - Continuation Directors on June 28, to Estado de Sao of the Planasa Program providing 1989. 3aulo (SABESP) water and sewerage services throughout Brazil. Advanced contracting up to USS40.0 million and retroactive financing up to US$10 million would be considered to finance urgently needed works. ;entrais Up to Rural Electrification II - Support To be determined. Project processing 1letricas 225.0 for next phase of sector rural postponed due to change in Irasileiras S.A. (Bank) electrification program. Government's priorities. (ELETROBRAS) CeAtral Bank of Up to Financial Sector I - To support Consulting services Negotiations postponed. Irazil 400.0 implementation of broader based required for research, (Bank) financial sector reform under economics and statistics. preparation by Government. :entrais 325.0 Environmental Reform and Energy Consultants needed for Negotiations postponed. ,letricas (Bank) Conservation - Continuation of integrated energy sector Irasileiras S.A. support for Government measures to study. Other consulting (ELETROBRAS) strengthen environmental and services to be conservation programs in the power determined. sector. 'entrais Up to Electric Transmission and To be determined. Appraisal mission in the letricas 350.0 Conservation - Financing of time field. Irasileiras S.A. (Bank) slice of power transmission and (ELETROBRAS) conservation investments in selected utilities. Project expected to finance investments associated with specific power projects and programs of sector utilities. linistry of Up to Second Northeast Basic Health - To be determined. Negotiations tentatively ealth 275.0 Support for improvement of basic scheduled for November. (Bank) health services in six states of the Northeast (Maranhao, Paraiba, At negotiations, Ministry Pernambuco, Aracaju, Sergipe and of Health will request Ceara), complementing the rural agreement for retroactive development effort; technical financing. assistance to strengthen (federal) Ministry of Health and the State Secretariats of Health. Total project cost estimated at $550 million of which $139 million in foreign exchange. 'ompanhia de Gas 94.0 Natural Gas Distribution - Expansion Consulting services for Loan approved by Executive ie San Paulo (Bank) conversion and revamping of COMGAS' gas utilization,study and Directors on April 25, (CONGAS) network to increase gas distribution engineering for future 1989. from 0.6 mm3 of city gas to 4.0 mm3 expansion, organization of mainly natural gas. study, training program Procurement: Retroactive needed. financing approved for US$9.4 million to finalize engineering and distribution network. Iinistry of Up to (R) Sugar Sector Adjustment - To To be determined. Project preparation ?inance 300.0 provide support to the process of postponed. Further (Bank) sugar subsector reform, particularly reporting will be in the areas of export and domestic discontinued. marketing, pricing and subsidies. - 108 - Member Country, Amount & Project3 Consulting Services Stage of Processing and Imlementing Probable Action on Procuren Agency Lender2 BRAZIL (Cont'd) Ministry of Up to Environmental Program - Provide To be determined. Project preparation un Interior 150.0 financial and technical support to way. (Bank) the Government's national environmental program. Ministry of Up to (R) Rondonia Natural Resource To be determined. Appraisal mission Interior/Rondonia 200.0 Management - The project would scheduled for end-July State (Bank) consolidate the first phase of Northwest projects in Rondonia, through policy improvements, agricultural intensification in established areas, forest management support forest extractive activities, environmental and tribal protection, and continued support for small karmer community projects and social services. Central Bank of Up to Agriculture Credit II - Follow-up to To be determined. Project preparation to Brazil 300.0 Agricultural Credit Project. follow initiation of (Bank) Agriculture Credit I Project. Central Bank of Up to Trade Policy I - To support the To be determined. Project preparation und Brazil 300.0 initial steps of a trade policy way. (Bank) reform under preparation by the Government. Central Bank of Up to Trade Policy II - To follow-up To be determined. Project preparation und Brazil 400.0 operations to Trade Policy I. way. (Bank) Ministry of Up to (R) Private Sector Development To be determined. Project preparation und, Finance/Banco 300.0 (formerly Privatization) - Support way. Nacional de (Bank) Government's efforts to improve Desenvolvimento credit allocation and further Economico a privatization efforts. Social (BNDES) Central Bank of Up to Commercial Marketing - Provision of To be determined. Project preparation undc Brazil 200.0 financial and technical support for way. (Bank) stockholding, expansion of private grain storage and other improvements in agricultural marketing infrastructure. Government of Sao Up to (R) Innovations in Basic Education - Consulting services Negotiations tentatively Paulo 245.0 Project will support development of expected for baseline scheduled for mid- (Bank) pedagogical and other innovations to studies and evaluation. September. increase learning and school attainment of poor children in Government has requested metropolitan Sao Paulo. The retroactive financing to innovations could serve as models cover project start-up for implementation throughout expenditures. Brazil. Ministry of 200.0 Northeast Basic Education II - The Consulting services Project preparation undej Education (Bank) project will support basic education expected for*management way. in four states in the Northeast. studies and evaluation. - 109 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Imlementing Probable Action on Procurement4 Agency Lender2 BRAZIL (Cont'd) Empresa 65.0 Agricultural Research III - Consultant services will Appraisal report under Brasileira de (Bank) Continued support for the national be required for studies preparation. Pesquisa research system focusing and research programs. Agropecuaria particularly in the northeast and Government has requested Amazon regions. retroactive financing to cover project start-up expenditures. Companhia de Up to Northeast Irrigation IV - One or To be determined. Appraisal report under Desenvolvimento 300.0 more northeast public Irrigation preparation. do Vale de Sao (Bank) projects generated by studies Francisco/Departm currently under preparation under ento Nacional de Northeast Irrigation Engineering Obras Contra As loan. Secas Ministry of 200.0 Metropolitan Health - Strengthening To be determined. Project preparation under Health (Bank) health services in various way. metropolitan areas. Central Bank of Up to Agricultural Sector IV - To provide To be determined. Project preparation under Brazil 400.0 continued support to the process of way. (Bank) agricultural trade, incentive and marketing reforms. Centrais 350.0. (R) Electric Distribution and To be determined. Appraisal mission in the Electricas (Bank) Conservation - Financing of time field. Brasileiras S.A. slice of power distribution and (ELETROBRAS) conservation investments in selected utilities. Project expected to finance investments associated with- specific power projects and programs of sector utilities. Departamento Up to (R) Highways Maintenance - Civil Consultant services will Appraisal report under Nacional de 200.0 works for the rehabilitation of be required for preparation. Estradas de (Bank) federal network; widening of Sao engineering, construction Rodagens (DNER) Paulo Curatiba highway; supervision and technical Procurement: Retroactive institutional strengthening and assistance. financing would be policy-action components for the considered, up to 10% of highway subsector. the loan amount, to ensure the continuity of the road rehabilitation program. Banco Nacional de Up to Feeder Roads - Provision of subloans To be determined. Project preparation under Desenvolvimento 300.0 to state and local road agencies to way. Economico e (Bank) improve feeder roads which are Social (BNDES) essential to agricultural production Procurement: Retroactive and to upgrade the maintenance of financing would be the roads under their jurisdictions. considered up to 10% of the loan amount to help start implementation of pilot subprojects. Secretaria of Up to Land Management II - To generate Consultants will be Appraisal report under Agriculture for 35.0 sustainable productivity gains required for Land use, preparation. the State of (Bank) through improved Land management and monitoring and training Santa Catarina soil conservation within about 600 components. small watershed areas in the southern state of Santa Catarina. - 110 - Member Country, Amount & Project3 Consulting Services Stage of Processing a and Imylementing Probable Action on Procuremen Agency Lender2 BRAZIL (Cont'd) Ministry of Up to Irrigation Subsector II - Private To be determined. Project preparation unde Irrigation 300.0 Irrigation (follow-up to Irrigation way. (PRONI) (Bank) Subsector I) in either Center-South or Northeast. Ministry of Land Up to Land Tenure Improvement II - Follow- To be determined. Project preparation unde: Reform (MIRAD) 150.0 up on Northeast Region Land Tenure way. (Bank) Improvement Project and expansion to other regions. CARIBBEAN REGION Caribbean 20.0 (R) CDB V - Onlending to member To be determined. Appraisal mission Development Bank (Bank) countries. scheduled for mid-August. 10.0 (IDA) CENTRAL AMERICA REGION Central American To be CABEI Technical Support - To be determined. Project preparation Bank of Economic deter- Development of administrative and suspended pending Integration mined financial capacity of CABEI. institutional (CABEI) strengthening of CABEI. CHILE To be determined 120.0 (N) Power - To expand Chile's power To be determined. Project identification (Bank) generating facilities to meet under way. growing demand of electricity. Empresa de Obras 20.0 (R) Valparaiso Water II - Expansion Consultants will be Project preparation under Sanitarias de la (Bank) of water production capacity, water required. way. V Region (ESVAL) and sewerage networks in greater Valparaiso and other cities, installation of a marine sewerage disposal system to clean the beaches of Valparaiso, construction of small treatment facilities to control water pollution in the Aconcaqua River Basin. To be determined 50.0 Social Sector Adjustment - Support To be determined. Project to be identified. (Bank) of sectoral adjustments in health, nutrition and/or education, to be defined. Ministry of 100.0 Irrigation Development - Development To be determined. Project preparation under Agriculture (Bank) of irrigated areas and creation of way. (MINAG); Ministry project authority to manage of Public Works programs. (MOP) EMPORCHI (Empresa 35.0 Port Rehabilitation and Intermodal Feasibility and Awaiting definition by Portuaria de (Bank) Transport - Rehabilitation of San preliminary engineering government of further Chile) Antonio and Valparalso ports of the studies have been studies to be performed. Fifth region and possible inter- completed. Final modal infrastructure improvement engineering consultants between Santiago and those ports. to be appointed. - 111 - Member Country, Amount & ProjectJ Consulting Services Stage of Processing and and Im?lementing Probable Action on Procurement4 Agency Lender2 CHILE (Cont'd) Ministry of 224.0 (R) Second Road Sector - Consultants required for Board presentation Public Works (Bank) Rehabilitation, upgrading and supervision work. tentatively scheduled for maintenance of the road network. October. Central Bank 130.0 (R) Financial Market Operation - Local consultant have Appraisal report under (Bank) Policy measures and financing to been appointed. preparation. Negotiations strengthen the capital market. tentatively scheduled for late August. COLOMBIA FONDO DRI 90.0 Third Integrated Rural Development - Consultants will be Appraisal mission (Bank) Support Government's policy to required. scheduled in mid-November. decentralize rural development activities by devolving responsibility to municipalities for financing and carrying out rural investments. Ministry of 250.0 (R) Trade Policy III - To support To be determined. Preparation mission Development (Bank) the Government's program to open the scheduled for mid- . economy to international competition November. by changing the levels and instruments of import protection, and may support other industrial policy reforms designed to increase domestic competition. Instituto 55.0 (R) Child Development and Community To be determined. Appraisal report under Colombiano de (Bank) Nutrition - To assist the Hogares de preparation. Bienestar Bienestar Infantil (EBI) to expand Familiar (ICBF) child nutrition programs, strengthen Retroactive financing its management and improve impact being proposed.. monitoring. CORELCA/ICEL 70.0 (R) Power Sector Investment I To be determined. Project preparation under (Bank) (formerly Power Distribution I) - To way. assist ICEL and CORELCA in the implementation of electricity distribution investment program. Ministerio de 22.0 Small and Medium Scale Mining - To be determined. Second preparation missior Minas (Bank) Promotion of export oriented small tentatively scheduled for and medium scale production of gold February 1990. and other minerals including modernizing legal framework. Technical assistance to miners and to administrators of project, credit to miners and investment financing. - 112 - Member Country, Amount & ProjectJ Consulting Services Stage of Processing and Im lementing Probable Action on Procuremej Agency- Lender2 COLOMBIA (Cont'd) Banco de la 63.0 Fifth Small & Medium Scale To be determined. Approved by the Executi% Republica (Bank) Enterprise (SME) - Institutional Directors on March 14, support and financing of SMEs in 1989. Colombia. Retroactive financing up to 10% of the loan amoun would be provided for SM lending and TA by qualified financial intermediaries. Banco Central 100.0 (R) Municipal Development - Fiscal To be determined. Post-appraisal mission Hipotecario, (Bank) and administrative decentralization scheduled for September. FFDU/ESAP by: (a) strengthening institutional capacity of small and medium sized municipalities, and capabilities of intermediary institutions; b) updating municipal cadaster. and: (c) supporting investments in municipal infrastructure and services. Ministry of 140.0 Health Services Integration II - To be determined. Project preparation undez Health (Bank) Decentralization of basic health way. Sectoral studies care services and improvement of initiated. nutritional status of vulnerable groups. HIMAT 78.2 Small Scale Irrigation - To expand Consultants will be Negotiations completed. (Bank) ongoing small scale irrigation required for Board presentation activities. strengthening scheduled for August 1, organization and 1989. management. Retroactive financing to January 1. 1989 of up to 10% of the Credit not to exceed US$2.0 million to be proposed. Government of 55.0 Second Rural Roads Sector - Expand Consultants will be Negotiations tentatively Colombia/Fondo (Bank) construction, rehabilitation and required for design and scheduled for September. Nacional de maintenance of rural roads. supervision of civil Caminos Vecinales works and for institutional development. To be determined 150.0 (R) Industrial/Restructuring - To be determined. Appraisal mission (Bank) Support for physical/financial scheduled for mid-October. restructuring of private sector industries to increase competitiveness in view of import competition from trade reforms and support for the expansion of non- traditional exports. COSTA RICA Instituto 20.0 Water Supply II - Improvements of Consultants will be Project preparation under Costarricense de (Bank) water supply and sewerage facilities required. way. Acueductos y in San Jose and surrounding areas Alcantarillados and institutional strengthening and (AyA) technical assistance to nationwide water company. - 113 - Member Country, Amount & Project0 Consulting Services Stage of Processing and and Im?lementLng Probable Action on Procurement4 Agency Lender2 COSTA RICA (Cont'd) Ministry of Up to Transport Sector - Maintenance and Consultants will be Appraisal report under Public Works 65.0 rehabilitation of the country's required. preparation. (Bank) importlexport corridors; rehabilitation of the Puntarenas Awaiting government action jetty; technical assistance to plan to rationalize Improve institutional efficiency of railway services. MOPT and other sector agencies; and procurement of equipment and computers. FONDO para la 30.0 Second Export Development - To To be determined. Appraisal report under Promocion de las (Bank) continue to provide assistance In preparation. Exportaciones the development of Costa Rica's non- (FOPEX) traditional exports. DOMINICAN REPUBLIC Secretaria de 15.0 Primary Education - Textbook, To be determined. Preparation mission in the Educacion, Bellas (Bank) management and rehabilitation for field. Artes y Cultos primary education. (SEEBAC) Ministry of 50.0 Fourth Road Rehabilitation - Consultants will be Preparation under way. Public Works (Bank) Financing of a five-year road required. rehabilitation plan, equipment, technical assistance and training. Instituto 30.0 Irrigated Farming Development - To be determined. Awaiting government review Nacional de (Bank) Increase agricultural output and of preparation documents. Recursos productivity from areas with Bidraulicos existing Irrigation infrastructure. To be determined 70.0 Power II - To follow up on Consultants will be Further preparation (Bank) rehabilitation in Corporacion required. depending on satisfactory Dominicana de Electricidad's compliance with covenants finances and operating practices. of Power I Loan. Construction of a 125 MW coal fired steam thermal plant. Ministry of 30.0 Coffee and Export Crops Development Consultants will be Project preparation under Agriculture (Bank) - Improvement of production, required. way. processing and marketing of coffee and development of non-traditional export crops. Fondo de 30.0 Industrial Free Zones - To assist To be determined. Approved-by the Executive Inversiones para (Bank) the Government to rationalize Directors on March 30, el Desarrollo Industrial Free Zone development and 1989. Economico (FIDE) provide term financing for private and public sector investment. Retroactive financing up to 10% of the loan amount would be provided for free zone development. ECUADOR Corporacion 100.0 Oil Production Development - Field Consultants will be Project under identifica- Estatal Petrolera (Bank) development and secondary recovery, required. tion. Equatoriana exploration promotion, crude (CEPE) pipeline expansion, technical assistance and environmental studies. - 114 - Member Country, Amount & Project3 Consulting Services Stage of Processinj and Imylementing Probable Action on Procurea Agency Lender2 ECUADOR (Cont'd) Ministerio de 25.0 (R) Education Sector (formerly Urban To be determined. Project preparation un Educacion y (Bank) Primary Education) - To improve way. Cultura quality of urban primary education. Upgrade programming capacity of the Ministry of Education. Banco de 100.0 Municipal Development - The project Consultants will be Project preparation un4 Desarrollo de (Bank) would consist of sector adjustment, required. way. Ecuador (BEDE) technical assistance and civil works to support fiscal and administrative Project Preparation reform among municipal governments Facility advance for and to expand and Improve basic $700,000 approved to municipal infrastructural services. finance consulting services, vehicles and equipment. Ministerio de 30.0 (R) Guayas Flood Control and Consultants provided by Appraisal scheduled for Agricultura y (Bank) Drainage - Lower Guayas River Basin Government of the January 1990. Ganaderia flood control and drainage in an Netherlands preparing (MAG/INERHI/ area of about 150,000 ha for feasibility study. CEDEGE) agriculture production. Ministry of 100.0 Industrial and Export Development - Consultants likely to be Project under preparatii Finance (Bank) Support of expansion and required. diversification of exports. Ministry of 20.0 (R) Health I - Provision of family To be determined. Preparation mission Public Health (Bank) health services in Quito and tentatively scheduled fc Guayaquil; sectoral development. . December. Bank Project Preparatior Facility advance for $372,000 approved to finance project preparation coordination team's salaries, vehicle and equipment. Instituto 45.0 Telecommunications - Rehabilitation Consultants will be Loan approved by the Ecuatoriano de (Bank) and expansion of telephone and telex required for cable Executive Directors on M Telecommuni- systems. engineering and 4, 1989. Signing not yel caciones (IETEL) supervision of - scheduled. construction. Corporacion 50.0 (R) Small-Scale Enterprises IV - To Consultants will be Negotiations postponed tc Financiera (Bank) strengthen the institutional setting required. September. Nacional (CNF) which makes possible and profitable the channelling of financial Retroactive financing of resources to small-scale $5.0 million is being enterprises. proposed to finance expenditures up to a maximum period of twelve months prior to the expected date of loan signing. To be determined 75.0 Industrial Finance II - Financing To be determined. Project preparation under (Bank) for medium and large scale way. manufacturing and service industries. - 115 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency Lender2 EL SALVADOR Banco Central Up to Industrial Credit Export - Provision To be determined. Further preparation 80.0 of working capital and investment pending discussions of (Bank) credit for export oriented policy issues. enterprises. GUATEMALA Municipality of 29.0 Guatemala City - Strengthening of Consultants required for Loan approved by the Guatemala City; (Bank) cadastre and management of land valuation and Executive Directors on and National municipality; infrastructure in low cadastre survey; . June 23, 1988. Signing Committee for income housing developments; street municipal finance and. tentatively scheduled for Reconstruction maintenance and rehabilitation. management; road September 1989. maintenance and operation; public passenger transportation; and low-income housing. Government and 80.0 (R) Export Sector Adjustment - This Consultants financed by Board presentation Banco de (Bank) mostly quick-disbursing loan would USAID required for trade tentatively scheduled for Guatemala support trade reform and export policies, export October 10, 1989. development as part of a package of promotion and export stabilization and sector adjustment financing. Retroactive financing measures supported by financial would be available for up assistance from the Bank. Major to US$12.8 million (20% o. components include financing of the quick-disbursing imported inputs for export products component of the loan) to and technical assistance. cover costs of imports made no earlier than four month before loan signing date. Ministry of 31.5 Secondary and Regional Road Consultants will be Loan approved by the Communications, (Bank) Rehabilitation - Strengthening of required. Executive Directors on Transport and sector planning and road management December 6, 1988. Signir Public Works rehabilitation of 390 km of gravel tentatively scheduled foi (MCTOP) secondary earth roads, 180 km of September 1989. paved roads, construction of about 500 m of small bridges, equipment, Retroactive financing of training and technical assistance. - US$1.5 million would be provided. Ministry of 30.0 Basic Education II - Improvement of Consultants will be Loan approved by the Education (Bank) access, learning and management of required for special Executive Directors on basic education through provision of studies. December 6, 1988. Signii classrooms, textbooks and staff tentatively scheduled fo training. September 1989. Banco de 35.0 Financial Sector - Support to the To be determined. Project to be identified Guatemala (Bank) Government's program of liberalizing financial markets. Increasing the efficiency of resource mobilization and financial intermediation and strengthening the regulatory and institutional framework. GUYANA Ministry of 3.0 Technical Assistance - To strengthen To be determined. / Appraisal report under Finance (IDA) the institutional capacity of the preparation. government to implement the structural adjustment credit, with special emphasis on central ministries and agencies. - 116 - Member Country, Amount & Project4 Consulting Services Stage of Processing and and Imylementing Probable Action on Procurement4 Agency Lender2 GUYANA (Cont'd) Ministry of 65.0 Structural Adjustment - Provide a Consultants have been Appraisal report under Finance (IDA) basis for sustainable economic retained. preparation. growth and normalize Guyana's financial relations with external creditors. Bauxite Industry 7.0 Bauxite Technical Assistance - Consultants have been Approved by the Executive Development Co. (IDA) Financing of management assistance retained. Directors on August 5, Limited contract, including pilot plant for 1986. Signing delayed new product development and cost because of Guyana's control system for bauxite sector. arrears to Bank. Total project cost estimated at $8.0 million, of which $7.0 million in foreign exchange. HAITI Organisme de 30.0 (R) Agricultural Production and Land Consultants will be Preparation mission Developpement du (IDA) Development - Increase agricultural/ required. scheduled for February. Nord (ODN) livestock production by making vacant public land available to landless farmers and protecting hilly sectors in the project area against erosion. Ministry of 20.0 (R) Forestry and Environmental Consultants will be Identification under way. Agriculture, (IDA) Protection - To strengthen required. Natural Resources activities initiated under First & Rural Forestry Project and to develop Development large scale reforestation and reduce (MARNDR), Projet pressure on wood resources. Forestier National (PFN) Ministry of 25.0 (R) Health and Population - Consultants will be Appraisal report under Health (IDA) Development of a basic health required for technical preparation. services delivery system in the assistance and studies. western region; support to the National AIDS and tuberculosis control program; and institutional development. Ministry of 25.0 Education V - Expansion of coverage To be determined. Preparation under way. Education (IDA) and Improvement of quality of primary education in both public and private schools. Vocational Training: expansion of quality and coverage. Institutional development of implementing agencies. To be determined 15.0 (R) Economic and Social Fund - To To be determined. Project preparation under (IDA) support employment-creation through way. the financing of labor-intensive microprojects, microenterprises and provision of social assistance, over a two-year period. Electricite 24.0 (R) Power V - To ensure more Engineering services and Approved by the Executive d'Haiti (EDH) (IDA) reliable supply of power by technical assistance Directors on June 27, Electricite d'Haiti by the expansion required to improve EDH's 1989. of generation capacity and commercial and control adjustments to the sub-transmission systems. Retroactive financina for and distribution systems. US6150,000 to pay for engineering services is proposed. - 117 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency Lender2 HAITI (Cont'd) Fonds de 11.0 Industrial Restructuring and To be determined. Negotiations scheduled for Developpement (IDA) Development - To provide financing mid-September. (FDI) and technical assistance for the restructuring of industrial enterprises affected by the trade reform and to promote export- oriented industries. Centrale Autonome 20.0 (R) Port-au-Prince Water Supply - IDA would finance Approved by the Executive Metropolitaine (IDA) Development of new water sources, strategic sanitation Directors on June 27, d'Eau Potable and installation of networks and study of Port-au-Prince. 1989. (CAMEP) connections. Caisse Centrale de Cooperacion Economique (CCCE) would finance consultancies for project supervision and technical assistance on management systems. HONDURAS To be determined 50.0 Trade Policy - To support the Consultants will be Project to be identified. (Bank) government's trade liberalization required. program and strengthen the regulatory and institutional framework. Ministry of 50.0 Public Enterprise Adjustment - To be determined. Project preparation under Finance and (Bank) Support for the Government's program way. Public Credit; of policy and institutional reforms Ministry of to improve efficiency of public Planning, enterprises. Coordination & Budgeting Empresa Nacional 50.0 Power Sector Adjustment - Project To be determined. Project preparation under de Energia (Bank) would support the financial and way. Electrica (ENEE) institutional rehabilitation of ENEE, including a program of efficiency improvements. Banco Central de 50.0 Financial Sector - Support to the To be determined. Project to be identified. Honduras (Bank) Government's program of liberalizing financial markets, increasing the efficiency of resource mobilization and financial intermediation and strengthening the regulatory and institutional framework. Ministry of 50.0 Agricultural Sector - Focuses on the To be determined. Project preparation under Finance/Ministry (Bank) structure of sector incentives, way. of Natural marketing and commercial policy, Resources land policy questions, and the institutional/organizational strengthening and redeployment of public sector agricultural agencies. JAMAICA Ministry of 20.0 Irrigation and Watershed Protection Consultants will be Project under preparation. Agriculture (Bank) - Support Government's programs of required. watershed management drainage, irrigation, environmental protection and agricultural support services. - 118 - Member Country, Amount & Project3 Consulting Services Stage of Processing and Imylementing Probable Action on Procurem4 Azency Lender2 JAMAICA (Cont'd) Ministry of Works 20.0 (R) Housing Sector (formerly Low To be determined. Project preparation und (Bank) Income Housing) - To assist the way. Government of Jamaica in the implementation of its shelter strategy which will inter-alia include: developing shelter programs more accessible to the poor on an affordable cost recoverable basis; encourage private sector participation in housing sector development; and introducing reforms in the housing finance system. National Water 15.0 Water Supply and Sewerage - To be determined. Project preparation und4 Commission (NWC) (Bank) Extension of water supply and way. sewerage in the tourist area of the north coast. Continuation of institutional strengthening through technical assistance and operational improvements. Ministry of 20.0 Road Planning and Maintenance - To be determined. Project preparation unde Construction (Bank) Support consolidation of further way. progress in road maintenance and upgrade institutional efficiency in transport agencies. Bank of Jamaica 25.0 (R) Agricultural Sector Adjustment - To be determined. Negotiations tentatively (Bank) Quick disbursing policy based scheduled for early operation with objectives designed September. to assist in policy reform and institutional strengthening in the Retroactive financing foi agricultural sector. an amount not to exceed 20% of the loan to be recommended. Clarendon Alumina 10.6 Bauxite/Alumina Reha bilitation - To be determined. Approved by the Executive Production Co. (Bank) Engineering and economic studies; Directors on May 16, 198S expenditures for sustaining capital and replacing equipment. Administrative 5.0 Public Administration II - Consulting services will Project preparation under Reform Program (Bank) Consultant services and equipment to be required. way. Unit support the Government's administrative reform program. Ministry of 25.0 (R) Trade and Finance II - Follow-up To be determined. Appraisal mission Finance (Bank) of Trade and Finance I scheduled for mid-October Planning 30.0 (R) Social Sectors Investment - To be determined. Approved by the Executive Institute of (Bank) Qrossectional invesiment project Directors on July 11, Jamaica with focus on polici and 1989. institutional refoi, support to the government's Human Resources Retroactive financing of Development program. up to US$2.0 million will be recommended. - 119 - Member Country, Amount & ProjectJ Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency Lender MEXICO To be determined 200.0 Water Sector - The proposed project Consultants will be Project under preparation. (Bank) -ill have two major objectives: the required. first is to develop more responsible and efficient institutions both at the national and local level and to introduce appropriate sector development policies. The second objective would be to help finance sector investment in medium and small cities throughout the country. Fideicomiso Fondo Up to (R) Low-Income Housing II - Consulting services will Negotiations tentatively Nacional de 400.0 Financing of a share of agreed be required. scheduled for September. Habitaciones (Bank) Investment program for low-income Populares housing, institutional building and Procurement: Retroactive (FONHAPO) preparation of special studies. financing is recommended for about 10% of the total loan amount. Banco Nacional de 20.0 (R) Water, Women and Development - Consultants' will be Approved by the Executive Obras y Servicios (Bank) Improve living standards for low- required. Directors on June 22, Publicos income population by providing water 1989. (BANOBRAS) and sanitation services and promoting income-generating Procurement: Retroactive activities, primarily for women, financing approved for up freed from the chores of fetching to US$1.5 million for water. expenditures incurred after January 15, 1989. Banco Nacional de 120.0 (R) Natural Hazard Mitigation - To To be determined. Appraisal mission Obras y Servicios (Bank) increase seismic resistance of scheduled for September. Publicos school buildings and health care (BANOBRAS) facilities and to strengthen institutions in charge of hazard prevention and emergency assistance. Secretaria de 400.0 Agricultural Sector II/Food Security To be determined. Project preparation under Agricultura y (Bank) - To increase agricultural growth. way. Recursos rate, improve resource allocation Hidraulicos within agricultural sector and improve efforts to increase food security for urban, rural and low income groups. To be determined 60.0 State Highways - Project to To be determined. Project under (Bank), strengthen road planning and identification. maintenance capabilities in a number of pilot states. To be determined 60.0 Industrial Technology II - To To be determined. Project preparation under (Bank) support industrial technology way. development and transfer by strengthening the institutions involved in developing and implementing Industrial technology -e policy, regulation and financing and broaden the range of instruments designed to encourage industrial technology development and financing. - 120 - Member Country, Amount & Projecti Consulting Services Stage of Processing and Im?lementing Probable Action on Procureme Agency Lender2 MEXICO (Cont'd) Secretaria de 45.5 Forestry - To increase production of To be determined. Board presentation Agricultura y (Bank) logs from natural pine forest areas, scheduled for August 22, Recursos and improve log utilization by local 1989. Hidraulicos forest industries in (SARH) Durango/Chihuahua States. Procurement: Retroacti% financing will be recommended for about 1C of total loan amount. Borrower not yet accepti tenders from bidders. Departmento del Up to Federal District Water and Sewerage To be determined. Project preparation unde Distrito Federal 100.0 - Technical assistance and way. (DDF) (Bank) operational improvement in the D.F. Nacional 250.0 Industrial Restructuring - To Consultants may be Loan approved by the Financiera (Bank) complement the Government's trade required. Executive Directors on (NAFIN) liberalization policies through (i) April 27, 1989. rationalization of relative prices and fiscal incentives in specific Procurement: Retroactiv sub-sectors; and (ii) development of financing of US$25.0 subsector restructuring strategies; million will be granted and (iii) financial and technical for expenditures incurre assistance to companies in need of after January 1. 1988. restructuring. Comision Federal 460.0 Hydroelectric Development - Consultants required for Loan approved by the de Electricidad (Bank) Financing of the Aquamilpa and energy studies and Executive Directors on (CFE) Zimapan Hydroelectric Project, plus environmental June 8, 1989. execution of energy-related studies resettlement studies. and an environmental and Procurement: Retroactive resettlement program. financing of US$20 millio (or 4% of the total loan) will be disbursed against payments for eligible expenditures incurred after August 31, 1988. Secretaria de 150.0 Health - Assistance in Improving the To be determined. Project preparation under Salud (SSA) (Bank) efficiency of health services and way. improving coverage to the poor. Secretaria de 400.0 Irrigation Sector - To provide To be determined. Project preparation under Agricultura y (Bank) support and assistance to the way. Recursos Government's program to strengthen Hidraulicos sectoral policies and institutions (SARE) in Mexico's irrigation/drainage sector. Fondo Para El 100.0 Agricultural Marketing II - Follow- To be determined. Appraisal report under Desarrollo (Bank) up project to help improve the preparation. Commercial efficiency of marketing and distribution and reduce excessive intermediation. Banco Nacional de 300.0 Export Development III - To provide Consultants may be Project preparation under Comercio Exterior (Bank) assistance in the development of required. way. (Bancomext) Mexico's non-traditional exports. - 121 - Member Country, Amount & Project3 -- Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 A,ency Lender2 MEXICO (Cont'd) National 300.0 Mining Sector - To provide support To be determined. Project preparation under FLnanciera (Bank) and assistance to the Government's way. (NAIN) program to strengthen sectoral policies and institutions in Mexico's mining sector, improve efficiency of mining enterprises, Increase exports of the mining sector and provide finance for sound sectoral investments and technical assistance for institutional strengthening. To be determined 150.0 (R) Small and Medium Industry V - Consultants will-be Project to be identified. (Bank) Support to integrated program to required. assist small and medium industry by providing credit and technical assistance. PARAGUAY Ministry of 20.0 (R) Education V - Extended To be determined. Project to be identified. Education and (Bank) elementary and secondary education Culture coverage and improve sector management and finance. ST. KITTS Ministry of To be Agricultural Sector - Support the Consultant services Preparation under way. Agriculture deter- Government's agricultural required for review of mined development objective of Improving sugar industry during the efficiency of the sugar industry preparation. while diversifying the agricultural base. ST. LUCIA Water Sewage 5.0 Water Supply Project for Castries Consulting services for Appraisal report under Authority (WASA) (IDA) and Northwest Region - Construction pre-feasibility and preparation. 2.5 of dam, pump station treatment feasibility studies (Bank) facilities, and expansion of contracted and funded by distribution system. Include CIDA, lead agency. technical assistance and measures for addressing environmental and health issues. TRINIDAD & TOBAGO Ministry of 35.0 (N) Public Sector Adjustment - To be determined. Preparation mission Finance (Bank) Project aims to promote public scheduled for mid-October enterprise reform and private sector development. To be determined 40.0 (N) Trade and Finance - Support of To be determined. Project preparation under (Bank) Trade Reform Program. way. To be determined To be Technical Assistance - To support To be determined. Appraisal report under deter- the adjustment program and monitor preparation. mined social costs of adjustment; - 122 - Member Country, Amount & Project3 Consulting Services Stage of Processing an and Imylementing Probable Action on Procurement Agency Lender2 TRINIDAD & TOBACO (Cont'd) To be determined To be Structural Adjustment - Project aims To be determined. Appraisal report under deter- at supporting a program of preparation. mined macroeconomic policy reforms. URUGUAY Municipal 30.0 (N) Montevideo Municipal Development To be determined. Project preparation would Government of (Bank) - Municipal strengthening with be re-initiated during the Montevideo particular emphasis on upgrading second quarter of FY90. operations and maintenance of infrastructure and services. Planning & Budget 6.5 (R) Technical Assistance II - Consultants will be Loan approved by the Office (Oficina (Bank) Provide consultants and equipment required. Executive. Directors on de Planeamiento y for meeting SAL II targets in tax June 8, 1989. Loan signed Presupuesto) administration, social security on July 19, 1989. system administration, financial sector rehabilitation and investment Procurement: Government planning. has requested disbursement of $700,000 of the proposed loan to retroactively finance expenditures since January 15. 1989. Administracion 60.0 (R) Telecom II - To rehabilitate and Consultants will be Project preparation under Nacional de (Bank) expand the telecommunication network required. way. Telecommunica- in Uruguay; to develop and improve clones (ANTEL) ANTEL; to improve the telecommunications sector in Uruguay by making certain policy changes in the sector. Ministry of 65.0 (R) Agricultural Development - To be determined. Negotiations under way. Agriculture (Bank) Follow-up on programs proposed by recent Agricultural Sector Review Retroactive financing of $6.0 million is being proposed for expenditures after January 1. 1989. Ministry of 140.0 (R) Structural Adjustment II - To be determined. Loan approved by the Economy (Bank) Continued support of Government's Executive Directors on medium-term recovery program. June 8, 1989. Loan signed on July 19, 1989. Procurement: Government has requested disbursement of $28.0 million of the proposed loan to retroactively finance its general imports since January 15, 1989 (excluding imports of items covered by the negative list). Administracion 87.0 (R) Power Modernization - To enhance No consultants required. Appraisal mission Nacional de (Bank) power distribution and generation rescheduled for November. Usinas de . reliability to Montevideo, and to Transmision strenghten UTE's institutional Electrico (UTE) capability. - 123 - Member Country, Amount & Project3 Consulting Services Stage of Processing and and Im lementing Probable Action on Procurement4 Agency Lender2 VENEZUELA Fondo de 250.0 (N) Industrial Restructuring - To To be determined. Preparation mission Inversion (Bank) support physical/financial scheduled for mid- restructuring of private sector September. industries to increase competitiveness in view of increased import competition from trade reforms and to support expansion of non-traditional exports. Ministry of 300.0 (N) Trade Policy II - To support To be determined. Preparation mission Development (Bank) trade reforms to neutralize scheduled for December. production incentives and encourage efficient resource allocation through continued elimination of quantitative restrictions in manufacturing and agriculture and reduction of tariffs. To be determined Up to (N) Urban Transport - Assist To be determined. Preparation under way. 100.0 Government in rationalizing sector (Bank) investment, cost recovery and maintenance policies. To be determined Up to (N) Slum Upgrading - To To be determined. Preparation under way. 100.0 counterbalance the effect of (Bank) macroeconomic adjustment by the Government on the urban poor; to finance investments to improve infrastructure services in the slum areas of the country's major cities. Central Bank 300.0 (R) Financial Sector Adjustment - To be determined. Appraisal mission (Bank) Support Government's reform programs scheduled for mid-October. in the financial system. Ministry of 300.0 (R) Public Enterprise Reform - To be determined. Preparation mission Finance (Bank) Support for the restructuring of tentatively scheduled for public enterprise policies, late August. including rationalization of transfer pricing and the institutional structure, and support for privatization programs. Ministry of 402.0 Structural Adjustment - Support the Consultants will be Approved by the Executive Finance (Bank) government's structural reform required. Directors on June 15, program. 1989. Retroactive financing of up to $88.4 million recommended for eligible imports and technical assistance expenditures incurred after April 1. 1989. - 124 - Member Country, Amount & Project3 Consulting Services Stage of Processing and Imlementing Probable Action on Procurem AgencY Lender2 VENEZUELA (Cont'd) Ministry of 353.0 Trade Policy - Support for trade Consultants will be Approved by the Execut: Finance (Bank) reforms to make production required. Directors on June 15, incentives neutral and encourage 1989. efficient resource allocation through elimination of quantitative Retroactive financing c restrictions and rationalization of up to 10% of the loan tariffs. amount would be availat for eligible imports occurring after March 1 1989. -125- V. NEW PROJECTS ADDED IN THIS ISSUE I. AFRICA REGION COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE BOTSWANA Ministry of Works, Transport Tuli Block Roads 1 and Communications P>B. 007 Gaborone Botswana Telex: 991-2743/2414 Cable: WORKCOM Telephone: 55303 CAMEROON Ministry of Planning Social Dimensions of Adjustment 4 Yaoundi Camerron Telex: 8268 Telephone: 221402/224902/233637 CENTRAL AFRICAN REPUBLIC Ministry of Public Health Health I 5 and Social Affairs B.P. 883 Bangui Telephone: 612901/613188 COTE D'IVOIRE To be determined Human Resources Adjustment I 9 KENYA Ministry of Finance Industrial Enterprise Restructuring 17 P 0 Box 30007 Nairobi Kenya Telex: 22003 Telephone: 338111 - 126 - COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE MALAWI Ministry of Health Third Family Health 21 P 0 Box 30377 Lilongwe 3 Malawi Telex: 44558 Telephone: 730099 ZAIRE Institut National pour 1'Etude Agricultural Research 39 13, Avenue des Cliniques B.P. 2037 Gombe Kinshasa 1 Republique du Zaire Telephone: 31274 II. ASIA REGION BANGLADESH Bangladesh Agricultural National Minor Irrigation Development 44 Development Corporation Krishi Bhaban 49-51 Dilkusha C/A Dhaka Bangladesh Telephone: 235268 CHINA Ministry of Agriculture Irrigated Agriculture Intensification 49 11 Nanli Nongzhanguan Beijing Telex: 22233 Telephone: 5003366 and Ministry of Water Resources P 0 Box 2905 Beijing Telex: 22466 Telephone: 367931 - 127 - COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE Xinjing Autonomous Region Tarim Basin Irrigation 49 19 Heilongjiang Road Urumqi Fax: 53415 Telephone: 51102 INDONESIA To be determined Basic Education 62 THAILAND Ministry of Communications Highway Sector III 80 Rajdamnoen Nok Road Bangkok 10100 Telex: 788-70000 III. EUROPE, MIDDLE EAST AND NORTH AFRICA MOROCCO Office National de 1'Eau National Water Supply and Sewerage 88 Potable 6 bis, rue Patrice Lumumba Rabat Morocco Telex: 31982 Telephone: 21281 TURKEY Turkish Electricity Authority Transmission 96 Inonu Bulvari No. 27, Kat: 3, Ankara Turkey Fax: 2138870 Telex: 42245 TEK TR Telephone: 222-9854 YUGOSLAVIA To be determined Financial Sector 101 - 128 - IV. LATIN AMERICA AND CARIBBEAN REGION COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE BRAZIL Petroleo Brazileiro S.A. (PETROBRAS) Energy Transport 106 Av. Rep. do Chile, 65, 230 Andar, Rio de Janeiro, RJ Brazil Telex: 391-533-2614 Telephone: 55-21-262-4023 Compania Hidro Electrica do Itaparica Supplemental 106 San Francisco (CHESF) Rua Elphego de Souza 333 . Ed. Andre Falcao-Bongi 50.760 Recife, PE Brazil Telex: 391-811350 Telephone: 227-4125/227-0497 Secretaria de Agricultura e Land Management II - Sao Paulo 106 Abastecunebti Av. Miguel Stefno 3.900 CEP 04301 Sao Paulo Brazil Telex: 011-12693 Telephone: 275-3433 CHILE To be determined Power Sector 110 TRININAD AND TOBAGO Ministry of Finance Public Sector Adjustment 121 PO Box 512 30 National Heroes Circle Kingston 4 Jamaica Telex: 381-2447 Telephone: 809-92-28600 Fax: 809-929-0005 To be determined Trade and Finance 121 URUGUAY Municipal Government of Montevideo Municipal Development 122 Montevideo (MM) Avda. 18 de Julio 1360 Montevideo Uruguay Telex: 398-22440 - 129 - COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE VENEZUELA Fondo de Inversion Industrial Restructuring 123 Esquina de Carmelitas, Torre Financiera, Caracas 1010 Apartado 2017, Caracas 1010-A Venezuela Fax: 58-2-83-4689 Telephone: 58-2-83-2101 Ministry of Development Trade Policy II 123 Centro Simon Bolivar Edificio Sur, Piso 5 Caracas Fax: 58-2-483-8552 Telephone: 58-2-422808 To be determined Slum Upgrading 123 To be determined Urban Transport 123 - 130 - VI. PROJECTS DROPPED FROM LENDING PROGRAM AND PROJECTS SIGNED I. AFRICA REGION COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE BENIN Ministry of Public Health Health 1 CAMEROON Ministry of Plan SAL I 4 Ministry of Plan and Economic Management 5 Technical Ministries CHAD Ministry of Public Works and Transport Sector Adjustment 7 Ministry of Transport DJIBOUTI Ministry of Public Works Urban II 11 GABON Ministry of Public Works, Road Maintenance 13 Equipment, Construction and Territorial Development THE GAMBIA Central Bank of Gambia SAL II 13 GUINEA-BISSAU National Bank of Guinea Bissau SAC II 16 Ministry of Planning Social and Infrastructure Relief (SIRP) 17 -131- COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE KENYA Central Bank of Kenya Financial Sector Technical Assistance 17 Central Bank of Kenya Financial Sector 18 MALI Ministere de l'Education Education Sector Consolidation 23 MAURITANIA Ministry of Interior and Infrastructure 24 SONELEC (Societe Nationale d'Eau et d'Electricite NIGER To be determined Agriculture Services II 26 SAO TOME AND PRINCIPE Ministerio da Economia e Multi Sector/Priority Works 31 Financas SOMALIA Ministry of Finance Agricultural Sector Adjustment Program II 35 TOGO Office des Postes et Telecommunications 37 Telecommunications (OPTT) Ministry of Plan Pre-Investment 37 Ministry of Planning and Mines Grassroots Development Initiatives 38 ZAIRE Department of Transportation; Transport Rehabilitation I 40 ONATRA; SNCZ GECAMINES Gecamines Technical Assistance II 41 - 132 - II. ASIA REGION COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE BANGLADESH Bangladesh Water Development Cyclone Protection 47 Board; Roads and Highways Department; and Local Government Engineering Bureau CHINA To be determined Yunnan Provincial Chemical Sector Development 51 INDIA Department of Electronics; Electronics 60 Industrial Credit and Investment Corporation of India (ICI) and Industrial Development Bank of India (IDBI) LAO PEOPLE'S DEMOCRATIC REPUBLIC Ministry of Finance SAC 69 MALAYSIA Federal Land Development Sabah Land Settlement and Environmental 70 Authority (FELDA) Management II III. EUROPE, MIDDLE EAST AND NORTH AFRICA TUNISIA Ministries of Education Education, Training and Employment Sector 96 and Social Affairs - 133 - COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE TUNISIA (Cont'd) Ministries of Planning Second Agricultural Sector Adjustment 96 and Agriculture Ministry of Public Works and Fifth Urban 96 Housing TURKEY Agricultural Bank of Turkey Agriculture Credit III 97 Four participating credit Small and Medium-Scale Industries II 98 institutions and several private and public sector institutions Several participating Credit Agro-Industry 98 Institutions (including TCZB, Halk Bank, SYKB), the Ministry of Agriculture, and an export training institution IV. LATIN AMERICA AND CARIBBEAN REGION BRAZIL Ministry of Finance Sugar Sector Adjustment 107 URUGUAY Planning & Budget Office Technical Assistance II 122 (Oficina de Planeamiento y Presupuesto) Ministry of Economy Structural Adjustment II 122