RP1731 Land Acquisition and Resettlement Framework January 2015 FIJI: Transport Infrastructure Investment Sector Project CURRENCY EQUIVALENTS (as of January 19, 2015) Fiji Dollar – (FJD) FJD 1.00 = USD 0.501 USD = FJD 1.995 ABBREVIATIONS ADB Asian Development Bank ADRA Adventist Development and Relief Agency ALTA Agricultural Landlord and Tenant Act APs Affected persons CPP Consultation and Participation Plan (for the project) DOE Department of Environment Department of Lands and Survey (within Ministry of Lands and DOL Mineral Resources) DPs Displaced persons DSC Design and supervision consultant ESMF Environmental and Social Management Framework ESMP Environmental and Social Management Plan EA Executing Agency FPAL Fiji Ports Authority Limited FTIIP Fiji Transport Infrastructure Investment Project FRA Fiji Roads Authority GAP Gender Action Plan GOF Government of Fiji Human Immunodeficiency virus Infection / acquired HIV/AIDS immunodeficiency syndrome IA Implementing Agency LARF Land Acquisition and Resettlement Framework LARP Land Acquisition and Resettlement Plan MAFF Ministry of Agriculture, Forestry and Fisheries MOU Memorandum of understanding Ministry of Rural and Maritime Development and National MRMD Disaster Management MWTPU Ministry of Works, Transport and Public Utilities NSS National safeguards specialist (in DSC team) SALA State Acquisition of Lands Act SPS Safeguards Policy Statement (ADB 2009) SSS Social safeguards/resettlement specialists TLTB iTaukei Lands Trust Board TIISP Transport Infrastructure Investment Sector Project WB World Bank GLOSSARY OF TERMS Meaningful A process that (i) begins early in the PPTA and is carried out on an ongoing consultation basis throughout the project cycle; (ii) provides timely disclosure of relevant and adequate information that is understandable and readily accessible to affected people; (iii) is undertaken in an atmosphere free of intimidation or coercion; (iv) is gender inclusive and responsive, and tailored to the needs of disadvantaged and vulnerable groups; and (v) enables the incorporation of all relevant views of affected people and other stakeholders into decision- making, such as project design, mitigation measures, the sharing of development benefits and opportunities, and implementation measures. This follows the principles of free, prior, and informed consultation (FPIC). Displaced In the context of involuntary resettlement, displaced persons are those who persons are physically displaced (relocation, loss of residential land, or loss of shelter) and/or economically displaced (loss of land, assets, access to assets, income sources, or means of livelihoods) as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas. Affected All persons living in the project impact zone whether they are land owning, persons tenants or without title to land. Terms of affected persons and displaced persons are used interchangeably in this report, they have the same meaning. Indigenous This is a generic term used to refer to a distinct, vulnerable, social and cultural peoples group possessing the following characteristics in varying degrees: (i) self- identification as members of a distinct indigenous cultural group and recognition of this identity by other groups; (ii) collective attachment to geographically distinct habitats or ancestral territories in the project area and natural resources in these habitats and territories; (iii) customary cultural, economic, social, or political institutions separate from those of the dominant society and culture; and (iv) a distinct language, often different from the official language of the country or region. Many indigenous peoples have become minorities in their own country, but in Fiji they remain the majority and do not suffer specific discrimination or disadvantage. Physical This means relocation, loss of residential land, or loss of shelter as a result of displacement (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas. Economic Loss of land, assets, access to assets, income sources, or means of displacement livelihoods as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas. Gender The process of ensuring that gender concerns and women’s needs and mainstreaming perspectives are explicitly considered in projects and programs, and that women participate in the decision-making processes associated with development-based activities. Country This is the legal and institutional framework of Fiji and it consists of its safeguard national, sub-national, or sectoral implementing institutions and relevant laws, system regulations, rules, and procedures that pertain to the policy areas of social safeguards (social and environmental). Significant The loss of 10% or more of productive assets (income generation) or physical impact displacement and/or both. iTaukei Indigenous Fijian people. iTaukei land is customarily owned Mataqali Indigenous Fijian clan who are usually the landowning unit. Turaga-ni-Koro Administrative leader of a village in Fiji. Appendix ____ 5 6 Table of Contents A. INTRODUCTION................................................................................................................... 7 B. OBJECTIVES OF THE RESETTLEMENT FRAMEWORK .......................................... 8 C. LEGAL AND POLICY FRAMEWORK.............................................................................. 9 D. PROJECT PRINCIPLES, ENTITLEMENTS AND PROCEDURES ............................ 17 E. ASSESSMENT OF IMPACTS AND PREPARATION OF LARP.................................. 22 SUBPROJECT SCREENING ......................................................................................................... 22 INITIAL SOCIAL ASSESSMENT .................................................................................................. 23 PREPARATION OF LARP FOR SUBPROJECTS ............................................................................. 23 F. CONSULTATION, PARTICIPATION AND DISCLOSURE ......................................... 24 G. COMPENSATION PAYMENT, INCOME RESTORATION, AND RELOCATION .. 25 H. GRIEVANCE REDRESS MECHANISM .......................................................................... 26 I. INSTITUTIONAL ARRANGEMENTS AND IMPLEMENTATION ............................ 28 J. IMPLEMENTATION SCHEDULE ................................................................................... 29 K. BUDGET AND FINANCING .............................................................................................. 31 L. MONITORING AND REPORTING .................................................................................. 31 6 Appendix ____ 7 A. Introduction 1. The proposed Transport Infrastructure Investment Sector Project (TIISP; the project) will be financed under the joint Asian Development Bank (ADB) and World Bank (WB) loan with counterpart funding from the Government of Fiji. The Project supports the Government of Fiji’s (GOF) Roadmap for Democracy and Sustainable Socio-Economic Development, which emphasizes the lack of transport as a constraint for Fiji’s economic and social development. It also responds to the requirements of the new 2013 Constitution of Fiji, which states that: “The state must take reasonable measures within its available resources to achieve the progressive realization of the right of every person to have reasonable access to transportation.� (34(1)). As approximately 55% (412,425)1 of Fiji’s population lives in the rural areas, and approximately 44% of rural people live in poverty, improving service delivery and income opportunities for the rural population is a key priority. 2. The impact of the Project will be improved access to markets, employment opportunities and social services. The outcome will be safer, efficient, resilient land and maritime transport infrastructure in the project area. There are two main outputs: (a) rehabilitated and climate resilient land and maritime transport infrastructure, and (b) efficient project management support and institutional strengthening. This relates to improving the capacity of Fiji transport agencies and related departments to manage bridge, roads, and jetty assets; also to provide greater levels of accountability and transparency in safeguards, in particular, land acquisition and resettlement processes. 3. The project activities comprise physical works including new infrastructure and/or the upgrading, renewal, rehabilitation and/or repair of public roads, bridges and/or rural maritime infrastructure in Fiji and non-physical activities such as institutional strengthening and capacity building within the transport sector.2 4. The project will be implemented following a sector loan modality. The nature of the sector project is that the types of subprojects to be undertaken are known in general terms but only a small number of sub-projects are identified at the project preparation stage. Sub- projects will be included in the sector project provided they meet the selection criteria. 5. Two sample sub-projects have been prepared following the due diligence requirements and serve as examples. Both sample sub-projects selected are for repair or replacement of two bridges in the upper Sigatoka Valley, and therefore small amounts of land will need to be acquired, either temporarily or permanently. This will be less than one hectare at each site. From a safeguards perspective the sample subprojects demonstrate application of the land acquisition and resettlement framework (LARF) and preparation of land acquisition and resettlement plan (LARP). 6. Other subprojects will include a variety of physical works including roads, bridges, and rural jetties and wharves. The work will be mostly to upgrade, rehabilitate and/or repair existing structure. It is not anticipated that there will be any physical displacement, as engineering designs will try to minimize the amount of land needed and will avoid physical impacts. Most work will involve existing structures, and therefore is not likely to have significant resettlement impacts on local communities. 1 Fiji Bureau of Statistics, Census 2007. 2 Public roads include national main roads (formerly main, secondary and country roads) and municipal roads under the responsibility of the Fiji Roads Authority (FRA), and rural roads under the Ministry of Rural and Maritime Development and National Disaster Management (MRMD). Rural maritime infrastructure includes rural jetties and wharves, but not including the main port infrastructure under Fiji Ports Corporation Ltd (FPCL). 8 7. It is estimated that each subproject will require on an average around 1 ha of land acquisition and, therefore, there may be around 20-30 ha of land acquisition need for the sector project (less than 30 bridges & 30km road). The subproject selection criteria exclude any subprojects with significant land acquisition and resettlement impacts. The project is classified as Category B on resettlement. 8. During each sub-project preparation, a LARP will be prepared based on available information of affected/displaced persons (APs/DPs). The information for other subprojects will be available only during implementation, so the LARP for these subprojects cannot be prepared before the project appraisal. The LARP for these subprojects will be prepared during project implementation. 9. This LARF outlines principles and procedures for preparing a LARP for each subproject. It is based on applicable laws of Fiji and ADB and WB policy requirements on resettlement. The executing agency (EA) will be the Ministry of Finance and the implementing agency (IA) will be the Fiji Roads Authority (FRA). B. Objectives of the Resettlement Framework 11. This Land Acquisition Resettlement Framework (LARF) outlines the principles and procedures to obtain land and address potential resettlement impacts under the project. The Executing Agency (EA) and the Implementing Agency (IA) will follow the procedures to comply with the government‘s applicable laws and regulations and relevant policies of the ADB and WB 12. The basic objectives of the LARF are to: (i) guide the EA/IA in obtaining land, properly identifying impacts, and restoring the livelihoods of affected persons (APs), (ii) serve as a binding document to ensure compensation and assistance to APs, and (iii) provide direction in preparing, updating, implementing and monitoring subproject Resettlement Plans (RPs). The RF includes measures to ensure that APs are (i) informed about their options and rights pertaining to resettlement; (ii) consulted on, offered choices among, and provided with technically and economically feasible alternatives; and (iii) provided prompt, adequate and effective payment / compensation at full replacement cost for losses of assets attributable directly to the Project. 13. The RF provides (i) the policy and legal framework of the Government and relevant policies of the ADB and WB; (ii) the compensation guidelines to be applied to all locations affected by the Project; and (iii) procedures to be followed during preparation, implementation, and evaluation of RPs. The RF’s process and outline will be used for the RPs for all subprojects requiring land or asset acquisition. RPs for the sub-projects will be prepared/updated after detailed design and submitted to ADB and WB for clearance. 14. The LARF outlines the policies and requirements for resettlement planning for the different scenarios as required by:: (i) the State Acquisition of Lands Act (SALA) of Fiji (Chapter 135 of Laws of Fiji); (ii) the ADB Safeguard Policy Statement; (iii) World Bank Involuntary Resettlement Policy (OP/BP 4.12). It provides guidelines on due diligence, social assessment, and preparation of LARPs for subprojects that may involve any form of land acquisition and resettlement impacts. It aims to provide safeguards to potential affected/displaced persons (DPs), and to ensure that the impacts of all subprojects are identified, mitigated and compensated adequately. Alternative design options will be considered during detailed design of the sub-projects to avoid and/or minimize involuntary 8 Appendix ____ 9 resettlement. C. Legal and Policy Framework (i) Fiji Laws on Land Tenure and Ownership 15. Land in Fiji is managed through three complementary systems: (i) native land; (ii) freehold land; and (iii) crown land. Native land, which is owned by iTaukei people, accounts for about 84 percent of all land, with freehold and crown or Government land accounting for around 8 percent each. Native and crown land cannot be bought or sold, but each is available on a leasehold basis, with leases often lasting up to 99 years, while freehold land can be bought and sold on the open market. 16. Native land is communally owned and administered by mataqalis (clans) and cannot be bought or sold except to the state for public purpose. The iTaukei Land Trust Board (TLTB) is the statutory body with the responsibility to administer, develop and manage this land on behalf of its owners and for their benefit according to the Native Land Trust Board Act. The TLTB identifies the land required for use by traditional Fijian communities and makes the remainder available for leasing. The TLTB, not the actual owners, issues the legally binding leases or agreements, which can be for agricultural, commercial, industrial or other uses. 17. All farmers of native land are either tenants or landowners farming with the permission of the own landowning clan. Some of these may have formalized their status by leasing the land and so have become tenants. Other tenant farmers will be either iTaukei from other islands or parts of Viti Levu, or Indo-Fijians. 18. The Agricultural Landlord and Tenant Act (ALTA) governs all agricultural leases of more than 1 ha and the relations between landlords and agricultural tenants. Minimum 30- year and maximum 99-year leases are allowed with no right of renewal. In practice, most leases are for 30 years. In the event of non-renewal, the tenant must vacate the land after a grace period. 19. The maximum annual rental is 6% of the unimproved capital value. In theory, the rental rate is reviewed every five years. The tenant can claim compensation for all development and improvements of the property with claims determined by the Agricultural Tribunal. Tenants can, however, only be compensated for improvements if the TLTB has granted prior approval to these improvements. In practice, there is a fixed schedule of lease rental rates under the ALTA, which has not been updated since 1997. The TLTB has, however, introduced a lump sum payment to induce landowners to lease their land for an additional 30-year period, but this “new lease consideration� has been applied mostly only to Indo- Fijian and not often to Fijian farmers. 20. The ALTA has been supplemented by the 2009 Land Use Decree No.36 (2010) because it was recognized that the requirement for tenants to vacate land once the fixed lease and grace period have expired, causes both social and economic hardship. Government therefore amended the land laws to increase the flexibility of leases and to facilitate leasing of lands, which are currently idle or unutilized, under terms and conditions which are meant to be attractive to both the landowners and tenants. The decree provides for longer tenure leases (up to 99 years) for agricultural and commercial development. Reserve land is presently not leased, but reserved by Mataqali/Government for future use. (ii) Fiji Laws on Land Acquisition and Compensation 21. The Constitution of Fiji provides for protection of private property against arbitrary 10 expropriation. The Constitution states that native (iTaukei) land cannot be permanently alienated except for the public purpose. It requires just compensation for all land or rights acquired by the government. 22. Land acquisition in Fiji is governed under the State Acquisition of Lands Act3 (SALA). Under the Act, all types of land can be acquired for public purposes. The law provides that in cases of land acquired for public purposes, legal title holders have a right to compensation. The law also provides for the right of land owners to legal proceedings for solving disputes and grievances. The customary rights of indigenous peoples without formal title are also protected. 23. The SALA guarantees compensation to those with recognized legal rights or interests in land. Compensation is paid at market values effective from the date at which notice of the State’s intention to acquire the land is given. Structures are, however, compensated only at book/depreciated values. Compensation includes for land, crops and trees, damage to portions of land not acquired (if any), changes in use and restrictions on use of any unacquired portions – and any reasonable expenses associated with necessary changes of residence or places of business. 24. In some areas, there may be, however, a substantive difference between local market prices and the prices overseas investors are willing to pay. There is now realization that there needs to be recognition of new values in certain areas. These new values would derive from recent sales prices to overseas investors. However, this is unlikely to be currently applicable to the Sigatoka Valley, a poor rural area where most subprojects are expected to be located. (iii) ADB SPS and World Bank Policy Requirements 25. ADB and WB policies on resettlement address both: (i) social and economic impacts, permanent or temporary, caused by acquisition of land and other fixed assets; and (ii) changes in the use of land or restrictions imposed on land as a result of a Bank operation. An affected or displaced person (AP/DP) is one who experiences such impacts. The objectives of the policy are: (i) to avoid involuntary resettlement impacts wherever feasible; (ii) to minimize resettlement impacts by choosing alternative viable project options; and (iii) to ensure that affected people receive compensation, assistance for relocation (including provision of relocation sites with appropriate facilities and services) and assistance for rehabilitation, so that they will be at least as well off as they would have been in the absence of the project. ADB safeguard policies. 26. ADB has the following policy principles that are similar to World Bank principles on involuntary resettlement: (i) Screen projects early on to identify past, present, and future involuntary resettlement impacts and risks. (ii) Carry out meaningful consultations with affected persons, host communities, and concerned non-governmental organizations. Inform all displaced persons of their entitlements and resettlement options. Ensure their participation in planning, 3 Originally the Crown Acquisition of Lands Act, 1940, subsequently amended: by Ordnance numbers 24 of 1940, 11 of 1942, 15 of 1943, 9 of 1955; Orders of Jan 1967 and Oct 1970 and Act of Parliament (Act No 1 of 1998). 10 Appendix ____ 11 implementation, and monitoring and evaluation of resettlement programs. Pay particular attention to the needs of vulnerable groups, especially those below the poverty line, the landless, elderly, women and children, and Indigenous Peoples, and those without legal title to land, and ensure their participation in consultations. Establish a grievance redress mechanism to receive and facilitate resolution of the affected persons’ concerns. (iii) Improve or at least restore, the livelihoods of all displaced persons through (a) land- based resettlement strategies when affected livelihoods are land-based where possible or cash compensation at replacement value for land when the loss of land does not undermine livelihoods; (b) prompt replacement of assets with access to assets of equal or higher value; (c) prompt compensation at full replacement cost for assets that cannot be restored; and, (d) additional revenues and services through benefit sharing schemes where possible. (iv) Provide physically displaced persons with needed assistance, including the following: (a) secure land tenure on land identified for new sites and (b) if necessary transitional support and development assistance such as land development, credit facilities, training, or employment opportunities. (v) Improve the standards of living of the displaced poor and other vulnerable groups, including women, to at least national minimum standards and provide access to land and other resources that is both legal and affordable. (vi) Develop procedures in a transparent, consistent, and equitable manner if land acquisition is through negotiated settlement to ensure that those people who enter into negotiated settlements will maintain the same or better income and livelihood status. (vii) Ensure that displaced persons without titles to land or any recognizable legal rights to land are eligible for resettlement assistance and compensation of loss of non-land assets. (viii) Prepare a draft resettlement plan and disclose a resettlement plan elaborating on displaced persons’ entitlements, the income and livelihood restoration strategy, institutional arrangements, monitoring and reporting framework, budget, and time- bound implementation schedule. Implement resettlement as part of the project. (ix) Pay compensation and provide other resettlement entitlements before physical or economic displacement and implement the resettlement plan under close supervision throughout project implementation. (x) Monitor and assess resettlement outcomes, their impacts on the standards of living of displaced persons, and whether the objectives of the resettlement plan have been achieved by taking into account the baseline conditions and the results of resettlement monitoring and disclose these monitoring results. World Bank safeguards policies 1. The WB‘s safeguard policy on Involuntary Resettlement – OP/ BP 4.12 (December 2001) – seeks to ensure that impoverishment risks due to involuntary resettlement are addressed and minimized. 2. The objectives of the policy are to: 12  Avoid resettlement where possible, and otherwise minimize through alternative project designs;  Resettlement should be conceived and executed as a sustainable development program;  Affected people should be meaningfully consulted, and be facilitated to participate in planning and implementing resettlement plans; and  Displaced people should be assisted to improve, or at least restore their livelihoods and standards of living to pre-project levels. 3. The policy includes direct economic and social impacts that result from (a) the involuntary taking of land resulting in (i) relocation or loss of shelter; (ii) loss of assets or access to assets; or (iii) loss of income sources or means of livelihood, whether or not the affected persons must move to another location; or (b) the involuntary restriction of access to legally designated parks and protected areas resulting in adverse impacts on the livelihoods of APs. 4. Where impacts on the affected population are minor, a short resettlement plan will be prepared. For projects causing significant resettlement (more than 200 people are displaced or will lose 10% of productive/income generating assets), a full resettlement plan is required. 5. The policy requires that in the resettlement planning process:  Affected people and their communities, as well as host communities, are provided timely and relevant information, consulted on resettlement options, and offered opportunities to participate in resettlement planning, implementing, and monitoring;  At new resettlement sites, infrastructure and public services are provided as necessary to improve, restore, or maintain accessibility and levels of service. Alternative or similar resources are provided to compensate for the loss of access to community resources (such as fishing areas, grazing areas, fuel, or fodder); and  Patterns of community organization appropriate to the new circumstances are based on choices made by the affected people, and existing social and cultural institutions of those people are preserved. 6. To achieve the objectives of the policy, WB requires that particular attention be paid to the needs of vulnerable groups among those displaced, especially those below the poverty line, the landless, the elderly, women and children, indigenous people, or other displaced persons who may not be protected through national land compensation legislation. 7. The policy comprises three important elements: (i) compensation to replace lost assets, livelihood, and income; (ii) assistance for relocation, including provision of relocation sites with appropriate facilities and services; and, (iii) assistance for rehabilitation to achieve at least the same level of well-being with the project as without it. 12 Appendix ____ 13 8. The policy recognizes as displaced persons as people in one of the following three groups: a. those who have formal legal rights to land (including customary and traditional rights recognized under the laws of the country); b. those who do not have formal legal rights to land at the time the census begins (i.e. affected people are counted and their assets identified through site visits by the project team) but have a claim to such land or assets-- provided that such claims are recognized under the laws of the country or become recognized through a process identified in the resettlement plan (see Annex A, para. 7(f) of WB policy); and c. those who have no recognizable legal right or claim to the land they are occupying. (iv) Comparison of ADB and World Bank Requirements and Fiji Laws on Land Acquisition 27. The following table provides an analysis of gaps between ADB/WB requirements and Fiji Laws and gap filling measures on land acquisition and resettlement. Gaps and gap-filling measures ADB and WB Fiji Laws on Land Gap-filling Measures Requirements on Acquisition/ Gaps Involuntary Resettlement Resettlement Avoid and/or minimize The Constitution and the No explicit The LARF/RP includes involuntary resettlement State Acquisition of Land reference to the measures on wherever possible by Act (SALA) set out the need for avoiding/minimizing land exploring project and conditions under which minimizing acquisition and resettlement design alternatives. land may be compulsory resettlement impacts. It provides principles acquired. The property can impacts by on compensation and only be acquired for the exploring entitlements. public good, and with the alternatives. payment of reasonable compensation. Enhance, or at least General principles of FIJI Laws do The LARF and each sub- restore, the livelihoods of all compensation for land and not prescribe project LARP includes displaced persons in real assets are set out in the measures to measures on compensation terms relative to pre-project Constitution and SALA. restore/ at replacement cost for levels. improve affected land/assets and to standard of minimize and mitigate Particular attention to be living. adverse social and economic paid to the needs of impacts. It is recommended vulnerable groups among for the Government to those displaced who may undertake a social not be protected through assessment of the impacts, national land compensation particularly for the poor and legislation. vulnerable groups. Screen the project early on SALA sets out the process No specific The LARF/RP includes to identify past, present, for land investigation requirements measures on survey/census, and future involuntary which includes for census, cut- cut-off-date, assessment of resettlement impacts and identification of affected off date, impact impacts and resettlement risks. Determine the scope landowners and their assessment planning. of resettlement planning assets. and scoping of 14 ADB and WB Fiji Laws on Land Gap-filling Measures Requirements on Acquisition/ Gaps Involuntary Resettlement Resettlement through a survey and/or resettlement census of displaced planning. persons, including a gender analysis, specifically related to resettlement impacts and risks. Carry out meaningful SALA sets out the process No specific The LARF/RP includes consultations with APs, of notification of the land provisions measures on consultations host communities, and acquisition. for preparing with DPs, including concerned NGOs. Inform all and vulnerable groups, during displaced persons of their implementing preparation and entitlements and LARP based on implementation of RPs. The resettlement options. meaningful concerns of women will be Ensure their participation in consultations identified based on sex- planning, implementation, with DPs, disaggregated socio- and monitoring and including the economic data, separate evaluation of resettlement poor, the discussions on women’s programs. Pay particular landless, concerns, and ensuring attention to the needs of elderly, women, adequate measures and vulnerable groups, and other budgetary allocations in the especially those below the vulnerable resettlement plan to poverty line, the landless, groups compensate and resettle the elderly, women and them in a manner that does children, and Indigenous not disadvantage them. In Peoples, and those without this effort the assistance of legal title to land, and national NGOs currently ensure their participation in engaged in women’s welfare consultations. will be sought; Establish a grievance SALA provides for appeal No The LARF/RP includes redress mechanism to against a declaration of requirements measures on project-specific receive and facilitate public purpose for for a project- grievance redress resolution of the affected compulsory acquisition specific mechanism. persons’ concerns. Support and amount of grievance the social and cultural compensation. redress institutions of displaced mechanism. persons and their host population. Improve, or at least restore, SALA sets out the process No specific The LARF/RP includes the livelihoods of all that any person who requirement for measures of on-site displaced persons through claims to be entitled to an land-based relocation, replacement of (i) land-based resettlement interest in compulsory resettlement, affected structures, strategies when affected acquired land may make a replacement of compensation at replacement livelihoods are land based claim for compensation assets, cost and priority of project where possible or cash (within 3 months). SALA compensation employment to DPs. compensation at also sets out the at replacement replacement value for land requirements for payment cost, and when the loss of land does and the provisions for benefit sharing. not undermine livelihoods, assessing compensation. (ii) prompt replacement of assets with access to assets of equal or higher value, (iii) prompt compensation at full replacement cost for assets that cannot be restored, and (iv) additional revenues and services through 14 Appendix ____ 15 ADB and WB Fiji Laws on Land Gap-filling Measures Requirements on Acquisition/ Gaps Involuntary Resettlement Resettlement benefit sharing schemes where possible. Provide physically and No equivalent provision. FIJI laws have The LARF/RP includes economically displaced no specific measures on-site relocation persons with needed provisions on of affected structures, assistance, including the relocation, transitional allowances and following: (i) if there is transitional restoration of civic relocation, secured tenure support and infrastructure. to relocation land, better civic housing at resettlement infrastructure sites with comparable and services. access to employment and production opportunities, integration of resettled persons economically and socially into their host communities, and extension of project benefits to host communities; (ii) transitional support and development assistance, such as land development, credit facilities, training, or employment opportunities; and (iii) civic infrastructure and community services, as required. Develop procedures in a No provision of The LARF/RP describes transparent, consistent, and DOL has Procedures for maintaining the measures on maintaining or equitable manner if land Land Acquisition through same or better improving livelihoods of APs acquisition is through negotiated settlement or income and through paying compensation negotiated settlement to purchase. livelihood at replacement cost and other ensure that those people status for APs. assistance. who enter into negotiated settlements will maintain the same or better income and livelihood status. Ensure that displaced -- Customary rights for There is The entitlement matrix for the persons without titles to Fijian people/ nothing in the project provides for land or any recognizable Indigenous People FIJI Laws to resettlement assistance and legal rights to land are stipulate that individuals address the compensation for non-land eligible for resettlement without formal title are issue of assets to non-titled DPs as assistance and also protected. displaced well. compensation for loss of persons without non-land assets land title or legal land rights. Prepare a resettlement plan -- FIJI Laws have The LARF includes measures elaborating on displaced no provision of on preparation of LARP for persons’ entitlements, the preparing subprojects involving land income and livelihood LARP. acquisition/resettlement restoration strategy, impacts. institutional arrangements, monitoring and reporting framework, budget, and time-bound implementation 16 ADB and WB Fiji Laws on Land Gap-filling Measures Requirements on Acquisition/ Gaps Involuntary Resettlement Resettlement schedule. Disclose a draft SALA sets procedures in No The LARF/RP includes resettlement plan, including notification of landowners requirements disclosure measures, documentation of the at different stages of land on disclosure of including posting of consultation process in a acquisition steps. an LARP. documents on website as timely manner, before well as providing information project appraisal, in an to DPs. accessible place and a form and language(s) understandable to affected persons and other stakeholders. Disclose the final resettlement plan and its updates to affected persons and other stakeholders. Conceive and execute No explicit provision - Land acquisition/resettlement involuntary resettlement as costs will be included and part of a development financed out of the project project or program. Include cost. the full costs of resettlement in the presentation of project’s costs and benefits. For a project with significant involuntary resettlement impacts, consider implementing the involuntary resettlement component of the project as a stand-alone operation. Pay compensation and SALA sets timing for SALA states The LARF/RP includes provide other resettlement payment of compensation. within 30 days measures on full payment of entitlements before physical of notification, compensation for affected or economic displacement. but does not assets before start of civil Implement the resettlement specifically works on affected land. plan under close state before supervision throughout displacement. project implementation. DOL Procedure provides for 75% before construction and 25% after construction. Monitor and assess No equivalent provision Gap. The LARF/RP includes resettlement outcomes, monitoring measures, their impacts on the including requirements of standards of living of semi-annual safeguard displaced persons, and monitoring report. whether the objectives of Arrangements for monitoring the resettlement plan have of resettlement activities will been achieved by taking be done by implementing into account the baseline agency, supplemented by conditions and the results independent consultant if of resettlement monitoring. sub-project is considered Disclose monitoring reports. high risk. 16 Appendix ____ 17 28. In terms of major gaps, the Fiji SALA and its regulations do not require compensation payments to affected persons who have no recognized legal right or interest in the land, and only require compensation on a depreciated/book value basis for structures. Informal sharecroppers and squatters (non-titled) are, therefore, not entitled to any kind of compensation for the land they use. However, to comply fully with ADB and WB resettlement requirements, any non-titled people affected by the Project at the time of the land survey to determine the cut-off date for eligibility for compensation and rehabilitation assistance will be entitled to compensation for loss of structures, crops, trees, or incomes they derive from land, regardless of whether they have formal title to the land or not. And, all compensation including for structures will be at replacement cost without any deduction of depreciation. 29. The SALA does not provide relocation sites (in the case of resettlement) and there is no provision for assistance for the rehabilitation of adversely affected people. However, the project seeks to avoid resettlement where possible and otherwise minimize through alternative project designs. In case resettlement cannot be avoided, mitigation measures to restore livelihoods and standards of DPs/APs to pre-project levels are described in the LARF, including how resettlement should be conceived and executed with the need for APs/ DPs to be meaningfully consulted and involved in the planning and implementation of any sub-project resettlement plan 30. The Fijian law does not provide for any special assistance for vulnerable groups or the poorest section of those adversely affected, but it does not prevent Government from providing assistance to adversely project affected people including vulnerable groups. The LARF includes provisions to ensure that affected people particularly vulnerable and disadvantaged people are assisted to improve their living standards. D. Project Principles, Entitlements and Procedures (i) Project’s Policy Principles 31. The project’s LARF has adopted a set of resettlement policy principles for the project which apply to all subprojects, as relevant. The principles are:  Land acquisition will be avoided or minimized through careful engineering design during detailed design. There will be no or minimum physical displacement of people. The Project will avoid subprojects involving resettlement impacts of significant nature.  Land acquisition and resettlement impacts will be assessed on time and LARP prepared based on social assessment. Draft LARP will be dislosed to affected persons before the subproject appraisal.  The FRA and TLTB will be responsible for public consultation and public information. Consultations and public participation will be carried out as an ongoing process throughout project planning, design and implementation stages.  Preparation of appropriate documents, planning and implementation for the acquisition of land and other assets will be carried out for each subproject and in consultation with the PAPs/ DPS. PAPs/ DPs will receive prior information of the compensation, relocation and other assistance available to them. The information to be provided in broadly described in Section E of the document. For each subproject, a LARP will be prepared to describe the specific involvement of resettlers in the sub-project 18 communities and the related institutional arrangements for their participation. . and for establishing the forms of compensation and assistance as well as a grievance mechanism based on cultural practices and agreeable to APs/DPs  DPs will receive compensation at replacement cost from FRA for their loss of land and assets (houses, other fixed structures), crops and trees and this should ensure they will be as well off or better off as without the Project. Compensation for vulnerable households will aim to restore or improve their livelihood and will be carried out with respect for their cultural values and specific needs.  Additional compensation and assistance will be provided, as required, to restore or improve living standards of all APs (as per ADB or WB requirements), including: (i) compensation to non-title holders such as squatters and sharecroppers recorded as of the cut-off date; (ii) compensation for any loss of livelihoods or income; (iii) compensation at full replacement cost for structures without deduction of depreciation, inclusive of transaction costs; (iv) compensation for transaction costs such as administrative charges, taxation and registration and titling costs; and (v) income- restoration measures.  All compensation will be fully paid to DPs prior to the commencement of site clearance at each subproject site.  Absence of formal title is not a bar to compensation and assistance, and particular attention will be paid to women and other vulnerable groups, as well as to sharecroppers or tenants without legal rights.  Land acquisition will be conceived as part of the Project and costs related to the land acquisition/resettlement will be included and financed out of the Project cost as part of the GoF contribution to the Project cost.  The impacts of the subprojects, including unforeseen losses and damages that may occur during either construction or operation, will be carefully monitored and remedial steps taken as required. (iii) Eligibility for entitlements and types of displaced persons 30. The date of land survey will be the “cut-off-date� for eligibility of compensation and rehabilitation assistance. Landowners and/or users that have documented claims to affected land, crops, and trees as of the cut-off date will be eligible for compensation and/or rehabilitation assistance as per the project policy. 31. The main categories of displaced persons eligible for compensation include: a) DPs with formal legal rights (Type 1). These are generally the customary owners of iTaukei lands or those with individual freehold titles recorded in the title registry and cadastral records in Fiji. This category also includes leaseholders with formal legal rights as tenants. b) Persons whose rights are not formal or legal, but whose claims on land or assets are recognized under national laws, such as those having informal leases on iTaukei land. (Type 2). Customary land tenure systems in Fiji are based on usufruct rights to land, and although no titles may exist, in practice some mataqali or individual households are granted use of land by owners, without formal title or leases. Where land records cannot be legalized, documentation and testimony from village chiefs and community leaders may be proposed to determine eligibility for compensation, replacement land, or other resettlement assistance. 18 Appendix ____ 19 c) Persons with no legal rights to land or assets at the time of assessment or census. (Type 3). This may include sharecroppers, squatters, or wage labourers who depend upon the land acquired. They have neither legal rights not recognizable ownership claims, but if the project land acquisition destroys their livelihoods, they are considered displaced persons and are entitled to receive resettlement assistance. (iv) Entitlement Matrix 32. A common matrix in the table below has been developed for the project taking into account potential impacts under the Project as a whole. This will guide the preparation of subproject specific entitlement matrix that will be developed as part of the LARP for each subproject. The subproject level matrix will show the exact types of losses and definition of the entitled person, or unit of entitlement. Matrix of Entitlements Impact/Type of Application Entitled DPs Entitlement Loss Temporary Customary land Landowners/users Rent as negotiated with landowners. All temporary occupation required of customary land use of land will be through written agreement with including any Alienated land Owners, Lease- the landowner/lease-holder and land will be damages within required holders, users returned to the landowners after rehabilitation to land used original or better condition. temporarily Compensation at replacement cost for any Loss of access damages within land used for project. during construction The project will ensure that DPs have causing uninterrupted access to their land and livelihood inconvenience sources. In case of any unavoidable loss of to DPs or access, DPs will be provided compensation for impacting their losses at replacement cost. For PAPs/ DPs livelihoods whose business income is temporarily lost due to the project, a disruption allowance will be given in cased on the temporary projected business income is lost. Permanent loss Customary land Landowners/users Cash compensation at replacement cost. of land required for the of customary land project construction Alienated land to be Owners/Lease- Cash compensation at replacement cost; OR acquired for the holders/Users New lease for alternative land, with no cost to DPs project construction for relinquishing original lease and processing alternative lease. Loss of Standing crops, trees Owner(s) of crops Compensation at replacement cost as determined gardens, trees, in the ROW or trees by the Forest Department for timber trees and the crops, irrespective of Department of Agriculture for crops or productive perennials, legal status plants/trees. and/or productive trees/plants Partial or total Structures in ROW Owner of Compensation at replacement cost without removal of structure deductions for depreciation or salvaged materials; structure irrespective of and assistance in locating suitable alternative (house or legal status housing or commercial building. commercial 4 structure) Shifting allowance for relocating household or business goods. 4 The shifting/relocation allowance will be agreed between the FRA and the household/DP on a case-by case basis. The shifting allowance will be adequate to cover: (i) dismantling of the structure; (ii) transport of structure/housing materials salvaged and all household effects/commercial goods; and (iii) costs of alternative accommodation, if required, while the structure is being re-built. 20 Affected Vulnerable Vulnerable Access to training programs developed under the vulnerable households losing households Project; households assets to the project identified through Employment during construction and maintenance consultation with for two household members (one male and one community female). Vulnerable groups will get priority in leaders. In the these activities. project’s context vulnerable groups Additional cash assistance depending on extent of include disruption to vulnerable AP's livelihood households mechanism. Amount to be specified in the LARP. headed by women, elderly, disabled, poor households, and physically relocating households. Displacement Community structure Community Replacement as agreed with community or cash of community or resources within representatives as compensation replacement cost without structure ROW if removed for identified by the deductions for any materials salvaged. project interest social impact assessment Assistance with dismantling and reconstructing structure or property. Unforeseen or Any impact identified Concerned Determined as per the spirit of this LARF. unintended during implementation affected people impacts (v) Process for Valuation of Compensation 33. FRA prepares initial valuations using local market prices, and data in this regard is obtained from the Valuation Division of the MLMR. The FRA may also involve the Department of Fisheries to assess compensation requirements, if any, regarding traditional fishing rights in river areas where bridges are expanded or altered. Finally determined prices, nonetheless, come about through negotiation with affected persons, because often market conditions for the replacement of land and assets are absent. 34. The current practice is to undertake valuation by FRA valuers and provide a private valuer to affected landowners in case of any disagreements. The FRA will continue providing the private valuer under the project, as a regular practice. It will inform the affected landowners at the beginning of the negotiation process about the availability of a private valuer and pay the valuer’s fee if landowners decided to use this service. 35. The compensation to be offered will be at replacement cost based on actual market price of affected land and asset. If the government policy does not provide for full replacement costs (e.g. for transaction costs), the project’s compensation will include top -up payments or assistance to cover the full replacement cost. 36. Full replacement cost is the cost of replacing an expropriated asset of the same or better quality in the current land and/or asset. Full replacement cost includes the following elements: a) Fair market value: Where markets function, fair market value can be assessed by examining land sales records in the last 3 or 4 years for similar properties. In parts of Fiji, land values differ widely because of factors such as proximity to the coast (for tourist developments), or fertility and flatness of agricultural land (for market gardening). In such cases, the market value is the going price of an asset in the open market, but where markets do not exist (as in much of rural Fiji), field investigations 20 Appendix ____ 21 are needed to collect baseline data to value assets, and to ensure that the valuation is realistic. b) Transaction costs: These may include the legal and documentation expenses associated with updating land records to reflect sales, transfers, inheritances and leases, as well as the legal expenses associated with registering property titles for replacement lands and houses. Transport costs may also be included. These costs will be paid by the project and are counted as part of the replacement cost. c) Interest accrued: When there is a gap of time between the agreed schedule and the actual payment of compensation, the interest that accrues over that period must be included in the replacement costs. d) Transitional and restoration costs: Transitional cost involves a short-term subsistence allowance to support the displaced persons through a period of income loss due to the project. Restoration cost refers to necessary improvements on land or to housing to achieve the objectives of enhancing or at least restoring, livelihoods, compared with pre-project levels. e) Depreciation will not be considered when valuing compensation for affected structures. (vi) Procedures for Land Acquisition and Compensation 37. Land acquisition procedures will be initiated once land surveys are completed, the design is done, and the alignment plan is agreed and approved by the FRA. The FRA will forward outline plans to the DOL, showing the estimated land-take, and request them to acquire the land. The DOL, on receiving the request, passes the alignment plan to the statutory section to prepare acquisition diagrams and carry out a search on land owners affected. After this, the plans are forwarded to the Valuation Division, which will assess compensation requirements and obtain all the land clearances. Once the Valuation Division has received the consent of the landowners, field inspections are carried out and a valuation report prepared based on an inventory of losses, taking into account relevant data and sales analysis. FRA’s lands and valuation officers work with DOL and relevant agencies in this process, including valuation of compensation. As stated in the previous section, FRA will also inform landowners of availability of the service of private valuaer at the beginning stage of this process. 38. Where iTaukei lands are involved a meeting will be convened with members of the identified mataqali, arranged by the FRA (usually the Lands Liaison Officer), assisted by the Provincial Council, to undertake negotiations to come to agreed values. The FRA will send the proposal to the TLTB, which will negotiate on behalf of the landowners. The mataqali owning the land will, however, have a final say whether to accept or reject the TLTB recommendations. 39. A Sale and Purchase Agreement is then entered into between the TLTB on behalf of the mataqali, and DOL. The Sale and Purchase Agreement is forwarded to the TLTB for its Board’s consent, accompanied by the relevant fees. Cheques are then processed and paid to the TLTB Board, based on estimated area, to be adjusted after the final survey and completion of works. 40. Leasehold native land follows a similar process, where a field inspection is carried out, a Valuation Report prepared and a Price Agreement executed. The Agreement is sent to the 22 TLTB with relevant consent fees for the Board to approve. If the lease is a registered one, then a caveat is lodged in the Titles Office (as an interim arrangement to prevent changes before the Sale and Purchase agreement can be finalized). The price paid for land will sometimes need to be divided between lessees and owners. Crown or state leases follow a similar process but do not require the Director of Lands consent. 41. In the case of freehold lands, after discussion with the DOL, the Valuation Division will prepare a Sale and Purchase Agreement and negotiate the purchase. 42. When compensation has been paid, a Certificate of Transfer is prepared and sent for execution. The FRA is then able to begin construction. 43. Following completion of the construction work, a final survey plan is done and once approved, this is viewed against the original acquisition diagrams. If the land used is found more than the original estimate then compensation will be adjusted to the exact size of the land used. In the case of leasehold land, after final surveys have been approved, compensation is adjusted in case of any excess land and surrender documents are prepared. The lessee is asked to provide lease documents for registration of the surrender at the Titles Office. The surrender documents are then forwarded to the TLTB prior to registration. The caveat is then withdrawn and title is retuned to the owners. 44. FRA’s social impact manager will work closely with the DOL and the TLTB to ensure safeguards are implemented as set out in the LARF. E. Assessment of Impacts and Preparation of LARP Subproject Screening 45. The project’s screening process will identify potential impacts of land acquisition and adopt necessary measures to avoid or minimize such impacts. FRA will screen impacts by completing the Subproject Screening Form as found in Annex 1. On the basis of the screening, FRA will adopt one of the following approaches: i. Further redesign of the subproject to avoid/minimize land acquisition/resettlement. ii. Preparation of the LARP if there are unavoidable land acquisition/resettlement impacts. In the event of no land acquisition/resettlement, this will be reported in the subproject report along with a due diligence report confirming that there is no need to prepare the LARP. The Due Diligence Report will include:  A brief description of the site including a location map and pictures;  A description of proposed works and type of activities;  Confirmation of land status, ownership, and usage (supported by land records);  Findings of the field visit and observations on the subproject site;  Process and outcome of consultations with stakeholders. Records of meetings (attendance, minutes, etc.); and  Confirmation that there are no land issues and a LARP is not needed. 46. The subproject report, including the Subproject Screening Form and all other relevant information about land acquisition/resettlement, will be submitted to ADB and WB together with the feasibility study report. 22 Appendix ____ 23 Initial Social Assessment 47. If resettlement is anticipated for any sub-project, the project authorities will carry out an initial social assessment to determine potential social issues and likely adverse impacts at the sub-project identification stage. Based on the initial social assessment decision can be taken on the types of detailed studies and field investigations required and necessary documentation. Preparation of LARP for Subprojects 48. The LARP will be prepared for subprojects involving land acquisition/resettlement impacts. The Annex 2 provides the outline of the LARP. The FRA will prepare the LARP with assistance from DOL, TLTB and other relevant authorities in the subproject area, and with close consultation with village leaders and DPs. The LARP must be submitted to and approved by ADB and ADB prior to awarding a contract for civil works for subprojects involving resettlement impacts. 49. The preparation of the LARP will include the following steps and activities: i. The FRA will organize consultations with DPs. The purpose of the consultations is to inform the DPs about the scope of works; and, the land acquisition/resettlement requirements. In the presence of village leaders, landowners/DPs and other stakeholders, FRA will identify the affected land and assets on the ground. ii. The FRA will conduct a detailed measurement survey (DMS) based on detailed engineering design and demarcation of land to be acquired. The DMS will include a) a census and socio-economic survey of APs, and b) measurement and inventory of affected land and other assets. The census and inventory of losses survey will count all DPs and a detailed list of affected land and other assets will be prepared. It will be conducted in a participatory manner to estimate impacts and losses. The socio-economic survey may cover all DPs if their number is small, but it will cover at least 10% of DPs and 20% of severely affected DPs. The surveys will document existing socio-economic conditions of DPs, including (a) demographic, education, and occupational profiles; (b) livelihoods and income; (c) type of land, use of land and other resources; and, (d) other relevant social aspects. The data will be disaggregated by gender and other relevant aspects such as number of DPs belonging to vulnerable groups. iii. A draft LARP will document the types and amounts of land that will be required. It will also summarize numbers of DPs; how they are affected by the losses; compensation and other assistance to which they are entitled to; and, amounts of compensation. The details will vary depending on the magnitude of land acquisition/resettlement. The LARP will also identify gender concerns and special measures for vulnerable DPs (if any) through consultations with affected communities. The LARP will include sufficient budget and specify source of funds, and confirm that compensation is at replacement costs based on market prices. There will be a cut-off date for the eligibility of compensation and/or rehabilitation assistance. The LARP will include an implementation schedule ensuring that civil works will not commence until compensation and/or assistance has been paid to DPs. 24 iv. The draft LARP will be presented to DPs and other stakeholders in a public meeting. DPs will be encouraged to express any concerns or suggestions. Copies of the draft LARP and/or summary brochures will be available during these consultations. The subproject LARP will be finalized, incorporating comments and suggestions of DPs. v. The LARP will be submitted for approval to FRA and ADB and WB. It will be disclosed to DPs and posted on ADB’s website. vi. The LARP will be coordinated with the government's land acquisition procedure. F. Consultation, Participation and Disclosure 49. Information dissemination, meaningful consultation, and participation of DPs and key local agencies will be undertaken to maintain transparency, raise awareness, reduce potential conflicts and delays, and achieve the objective of the LARP. The actions that will be undertaken for participation in the various stages of land acquisition and resettlement planning are:  Identification of stakeholders, who will be involved in planning and implementation: DPs, local officials (Rural Local Authority, Provincial Administration, Provincial Council, District Office), local communities at subproject sites, project authorities, implementing agencies, and NGOs.  Dissemination of information (including project entitlements), and appropriate mechanisms for feedback and facilitation of the consultation process.  Setting of a grievance redress mechanism and procedures.  Community participation in monitoring the LARP. (i) Mechanisms for consultation 50. A variety of mechanisms will be utilized to consult with stakeholders and DPs during preparation and implementation of LARP including: (a) village meetings involving both women and men from communities - to consult them and to disseminate information about the subproject; (b) specific facilitated meetings with DPs including mataqali leaders, land owners, and users affected directly by the project; (c) separate meetings with women DPs and vulnerable households; (d) key informant interviews with relevant government staff, mataqali leaders, Turaga-ni-Koro, chiefs, women, religious and youth leaders (d) one-to-one socio-economic household survey of DPs and affected communities; (e) participatory compilation of the Inventory of Losses, and (f) informal conversations with passers-by and transport users near the subproject sites. Consultations will be undertaken in the Fijian vernacular where possible, or translated from English into the local Fijian dialect. Household interviews or focus group discussions with Indo-Fijians should, where possible, be conducted in Hindi or English. 51. An important incentive to greater participation is to ensure consultations are undertaken at venues and times that do not disadvantage women. Where it is impossible or inconvenient for women to attend community meetings or DP consultations because of child care responsibilities, caring for the sick and elderly, or because of traditional norms, women will be consulted in their own homes. (ii) Responsibilities for Consultation and Participation 24 Appendix ____ 25 52. The key organisations involved in facilitating and managing the participation, consultation and disclosure for the land acquisition, resettlement, and compensation process are: a) The FRA will have overall responsibility for consultation and participation of stakeholders. One of the FRA’s staff will facilitate community liaison activities. b) The safeguards specialists at FRA will ensure that consultation occurs as planned, and that information is disclosed in a timely way. They will be responsible for preparing information brochure and disseminating it widely to affected communities and local authorities. c) The DOL Valuation Division in the MLMR will work with/assist FRA land officers in (a) village consultation meetings; (b) all initial valuations; (c) identification of owners and leaseholders and (d) negotiations with land owners for purchase of land. Their role is an important one in terms of informing DPs of the value of their assets. d) The TLTB (through the various Provincial Councils) which represents and negotiates on behalf of the mataqali land owners, will sign agreements on their behalf and is responsible for securing the consent of mataqali members prior to making such agreements. e) The Provincial Council will facilitate discussions around land acquisition, between the project’s safeguard specialists and communities. (iii) Disclosure Arrangements Stakeholders and DPs will be provided with relevant, timely information about the project, its land acquisition requirements, and policies on compensation and entitlements, and established grievance redress mechanism (as described under section H) during preparation of the LARPs. The LARP will be disclosed to DPs and stakeholders, and an information brochure will be available in English and Fijian, summarizing the entitlements and other relevant information. 53. This will be disseminated at meetings, and available at local authority offices in affected districts. The LARP will also be uploaded to the ADB website upon submission by the FRA. The FRA, the Provincial Council and the TLTB will continue to consult and engage with DPs, landowners, tenants, prior to and throughout project implementation. Formal consultation with DPs will take place again after detailed design work is completed, and prior to commencement of any project works, to enable compilation of a full census and inventory of losses. Community leaders and representatives from the DOL and TLTB will inform the affected parties and will respond to all compensation related inquiries. G. Compensation Payment, Income Restoration, and Relocation (i) Disbursement and Payment of Compensation 54. FRA will coordinate with DOL, TLTB, Provincial Councils and District Administrations to disburse and pay compensation to DPs in accordance with the Entitlement Matrix as described in preceding sections. Compensation will be paid and affected structures, if any, will be relocated before taking possession of land/properties and prior to the start of civil works. Local authorities, particularly, the village leaders (Turaga-ni-Koro), will assist in identifying entitled persons and delivering the compensation amounts. 26 (ii) Income Restoration Measures 55. Apart from direct compensation, implementation of other measures to restore incomes for DPs will be adopted, such as employment in project construction, skills training, community development, or assistance to vulnerable groups, to be specified in the subproject LARP. Income restoration measures will focus on the poor and vulnerable people whose daily income and livelihood sources are at risk. 56. It is estimated that each of the subproject could take up to 18 months to construct and waged labour opportunities will be made available as a priority to DPs. DPs who will be offered employment on the Project, will be provided with on-the-job training by the contractors. Such training will include skills required by subproject activities. (iii) Measures for replacement Land 57. DPs losing land are expected to find replacement land of equal or better productive potential at nearby places. Because land is owned communally by the mataqali unit, in many parts of Fiji it is a relatively simple procedure for clan leaders to reallocate land among their members to ensure no one is disadvantaged by the project. However, in some districts there are land shortages, and replacement land may not be easily available. In this case, alternative income restoration methods will need to be undertaken for DPs losing significant portion of their productive land, such as employment and skills training. H. Grievance Redress Mechanism 59. In order to receive and facilitate the resolution of DPs’ any concerns, complaints, or grievances about the project’s safeguards performance, a Grievance Redress Mechanism (GRM) will be developed for the project including at each subproject site. When and where the need arises, this mechanism will be used for addressing any complaints that may arise during the implementation and operation of the project. The GRM will address APs’ concerns and complaints promptly and transparently. The GRM will be gender responsive and readily accessible to all DPs at no costs. The GRM will use traditional systems for conflict and dispute resolution and, as far as possible, problems, concerns or grievances will be resolved at the project level. The GRM will not however impede DPs access to the Fiji’s judicial or administrative remedies. FRA in coordination with relevant agencies will inform DPs about the GRM. 60. The key functions of the GRM will be to (i) record, categorize and prioritize the grievances; (ii) settle the grievances in consultation with complainant(s) and other stakeholders; (iii) inform the aggrieved parties about the solutions; and (iv) forward the unresolved cases to higher authorities. 61. The subproject manager or engineer supported by FRA’s social impact manager and consultants will be the grievance focal point to receive, review and address project related concerns and to resolve land related disputes in coordination with the government authorities. DPs will be made fully aware of their rights during consultations about land requirements. No costs will be charged for anybody making a complaint. DPs will be exempted from any fees associated with resolving the grievance pursuant to the project’s grievance redress procedure. 62. Complaints will be recorded and investigated by FRA’s social impact manager working with relevant staff of the individual subproject. The FRA will be immediately informed/updated of any complaints from DPs by FRA’s social impact manager. A complaints register will be maintained which will show the details and nature of the 26 Appendix ____ 27 complaint, the complainant, the date and actions taken as a result of the investigation. It will also cross-reference any safeguard compliance report or other relevant documentation. 63. When subproject implementation starts, a sign will be erected at all sites providing the public with updated project information and summarizing the grievance redress mechanism process including contact details of FRA’s social impact manager. All corrective actions and complaints responses carried out on site will be reported back to FRA. FRA will include information from the complaints register and corrective actions/responses in its progress reports to the ADB and WB. 64. In the whole process, relevant Fiji agencies (DOL, TLTB, etc.) will be always available to review public complaints and advice on the FRA’s performance for grievance redress. Steps of Grievance Redress Process 65. Any APs or village head/chief can take a grievance to the FRA or the site office. On receipt of a complaint in any form (in person, telephone, written), FRA’s social impact manager for respective site/subproject will log the details in a complaints register. The register will record complaints by date, name, contact address and/or phone number if available, and reason for the complaint. If the complainant desires, their identity may be kept anonymous but the nature of their concern should still be recorded. A duplicate copy of the entry is given to the person making the complaint for their record at the time of registering the complaint. The duplicate copy given to the complainant will also show the procedure that will be followed in assessing the concern or complaint. For straightforward grievances, the project engineer can make an on-the-spot determination to resolve the issue. 66. FRA’s social impact manager will review and find a solution to the problem within two weeks in consultation with village or traditional chief and relevant local agencies. FRA’s social impact manager will report back the outcome of the review to the village/traditional chief and affected persons within a week’s time. If the complainant is dissatisfied with the, or have received no advice in the allotted time period, he or she can take grievance to FRA CEO. The FRA CEO in coordination with relevant national agency reviews and reports back to the DPs or chief about outcome. If unresolved, or at any time complainant is not satisfied, he or she can take the matter to appropriate court. Both successfully addressed complaints and non-responsive issues will be reported to the ADB and WB by FRA. 67. Table below sets out the process to resolve any project related grievances. Grievance Redress Process Stage Process Duration 1 DP/village head or traditional chief takes grievance to Any time FRA’s social impact manager 2 FRA’s social impact manager reviews and finds 2 weeks solution to the problem in consultation with village head or traditional chief and relevant agencies 3 FRA’s social impact manager reports back an 1 week outcome to village/traditional chief/DP If unresolved or not satisfied with the outcome by FRA’s social impact manager 4 DP/village head or traditional chief take grievance Within 2 weeks of FRA CEO. receipt of decision in step 3 5 FRA CEO reviews and find a solution in coordination 4 weeks with relevant agencies 6 FRA CEO reports back the solution/decision to 1 week 28 DP/village head or traditional chief If unresolved or at any stage if DP is not satisfied DP/village head or chief can take the matter to appropriate As per judicial system court I. Institutional Arrangements and Implementation (i) Institutional Responsibilities 68. The following are key agencies responsible for the project’s land acquisition, resettlement and compensation activities: (i) The Ministry of Finance will be the Executing Agency. The FRA as the Implementing Agency will have overall responsibility of the project including safeguards. The FRA responsibilities are (a) identification of affected areas; (b) all community liaison; (c) budgetary provision; (d) manage their social impact manager; (ii) FRA will ensure that compensation is paid as required under the LARF. If needed, a top-up resettlement budget will be made available to the safeguards staff to provide the additional compensation/assistance (if any). FRA’s social impact manager will also be responsible for identifying capacity gaps and providing training and capacity building to Fijian agencies involved in land acquisition. (iii) The DOL and FRA land and valuation officers will be responsible for (a) all initial valuations; (b) identification of owners and leaseholders and (c) negotiations with land owners. (iv) The TLTB, which represents and negotiates on behalf of the mataqali land owners, will sign agreements on their behalf and will be responsible for securing the consent of mataqali members prior to making such agreements. Fiji Roads Authority 69. FRA will be responsible for overseeing and managing project execution including compliance with project requirements including safeguards. FRA will recruit a social impact manager for the project. FRA’s social impact manager will ensure that the procedures and processes established in this LARF are followed for the project. However, preparation of the LARP for individual subprojects will be the responsibility of the safeguards specialists within the design and supervision consultants (DSC) for respective subprojects. Design and Supervision Consultant (DSC) 70. The DSC will include international and national specialists to implement the safeguard tasks at specific subprojects as required by the LARF. This will include: (i) social safeguard/resettlement specialist (international) (SSS); and (ii) safeguards specialist (national) (NSS). The DSC will be headed by a team leader. 71. Safeguards responsibilities of the DSC include:  Ensuring that safeguards are implemented as set out in the LARF and other safeguard documents so as to meet intended requirements.  Undertaking safeguards assessments during the feasibility study, ensuring that the LARPs are prepared. 28 Appendix ____ 29  Supervising the safeguards implementation, including implementation of relevant LARP activities. 72. Within the FRA, safeguard specialists will have specific responsibilities for implementation of the LARF and LARP. Their TOR is in the Annex 3. Department of Lands 73. The DOL will be responsible for (a) attending village consultation meetings; (b) initial valuations; (c) identification of owners and leaseholders (d) negotiations with land owners; (e) preparation of Sale and Purchase Agreements and sending to the TLTB for Board endorsement; (f) approval of final land surveys on completion of Project, and adjustment of land compensation required; (g) preparation of land transfer, lease surrender, or freehold dedication documents; and (h) registration of titles. iTaukei Land Trust Board (TLTB) 74. The TLTB, which represents and negotiates on behalf of the mataqali land owners, signs agreements on their behalf and is responsible for securing the consent of mataqali members prior to making such agreements. The TLTB Board must endorse and approve the Sales and Purchase Agreements, and transfer documents. (ii) Institutional Capacity Support 75. Capacity of FRA and government agencies involved in land acquisition is still weak in the areas of safeguards and will be strengthened under the project.5 FRA’s social impact manager will provide training to staff of FRA and relevant government agencies such as DOL and TLTB, mainly in the form of on-the-job training, but also through special workshops to enhance their institutional capacity and improve safeguard practice in Fiji. Based on the experience of training together, working groups can be established to ensure interdepartmental coordination. An initial workshop will be held for all staff involved in land acquisition in the early stages of the project, following by mentoring and on-the-job training. Further workshops on specific topics will be organized, as needed, once implementation is underway, particularly to ensure that monitoring activities are undertaken according to the LARF. (iii) Role of other organisations: civil society and women’s groups 76. There are few local NGOs or women’s groups involved in the planning and management of any land acquisition or resettlement activities, except for groups of the landowning mataqali. Local groups and leaders will be consulted when identifying any particularly vulnerable people. Other NGOs, if available, will be consulted about land and livelihoods issues. They will also be consulted during monitoring of the LARP and its outcomes, as required. J. Implementation Schedule 5 FRA has one Lands Liaison Officer and three Valuers. They have knowledge and experience on the local context, but have not had formal training on ADB and WB safeguard requirements. Other Fijian government organisations at both central and provincial level are familiar with Fijian legislation and regulations for acquiring land and paying compensation according to the law, but also lack staff with specific training or knowledge of ADB and WB safeguards and resettlement issues. 30 77. An indicative implementation schedule for the Project land acquisition and resettlement activities is provided in the Table below. This include activities to (i) prepare/update the LARP; (ii) implement the LARP: and (iii) monitor activities. A more detailed schedule with specific target dates will be provided in the LARP for each subproject during implementation. Activities Responsible Timing Agency Prepare/Update LARP 1 Confirm land requirements based on detailed Consulting Month1 engineering design of the bridges. Determine engineers areas of land, which will fall outside the existing road reserve. 2 Provide plans identifying areas to be acquired to FRA Month 1 DOL and TLBT 3 Determine type of affected land tenure (iTaukei, DOL & TLTB Month 1 leased, or freehold) 4 Determine numbers in mataqali group, land DOL, TLTB, and Month 2 owners and users affected (DPs), and identify FRA any vulnerable households through social assessment 5 Conduct consultations with affected communities DOL, TLTB, FRA Month 2; and agree on land acquisition Ongoing 6 Obtain written consents from each landowning DOL & TLTB Month 3-4 unit during consultation meeting 7 Cadastral survey of land if not previously done, DOL; FRA Month 2 and submission for land registration 8 Conduct titles/leases search in Government titles DOL and FRA Month 2 registration office for affected land ownership 9 Determine and mark areas for each land unit DOL and FRA Month 2 required 10 Conduct inventory of losses – land, trees, crops FRA, Valuation Month and provide valuation for compensation Division DOL & 4&5 MAFF 12 Negotiate compensation with land owners FRA, DOL & TLTB Month 5 (mataqali) or holders of Native Leases or freehold landowners 13 FRA submits the updated LARP for approval and FRA & ADB &WB Month 6 uploading on the ADB and WB/ InfoShop website LARP Implementation 14 Execution of Sale and Purchase Agreement. FRA, DOL and Month 5 Endorsed by TLTB. TLTB 15 Payment of compensation and allowances DOL, FRA and Month 6 TLTB 16 DOL completes land transfers & registration DOL Month 7 17 FRA submits the Land Acquisition Completion FRA Month 7 Report to ADB and WB 18 Award of civil works contract, clearance of land, FRA Month 8 and briefing of contractor on safeguards 19 Commencement of civil works (contingent on FRA Month 9 compensation and allowances being paid) 20 Final survey plan on completion of work; FRA and DOL Month 15 payment of adjusted compensation as required 30 Appendix ____ 31 Monitoring 21 FRA starts AP socio-economic monitoring FRA Month 12 22 FRA submits progress report to ADB and WB on FRA Six - implementation of the LARP monthly 23 FRA conducts post-project survey and final FRA Month monitoring repot 16 K. Budget and Financing 78. All land acquisition, compensation, and income restoration costs for the project will be financed by the government using counterpart funds. The budget for such activities will be estimated during feasibility based on interviews with affected communities. This will be updated after the detailed survey and valuation, and further consultations with DPs. The government will release sufficient budget for implementation of compensation, resettlement and rehabilitation activities in an appropriate and timely manner. 79. The FRA will prepare the necessary arrangement for disbursement of compensation in coordination with the DOL and TLTB. FRA’s annual budgets will show the cost of the land acquisition / resettlement according to project activities. 80. The LARP for the Year 1 sub-projects provides a summary of some of the anticipated budget needed to implement the LARF for the two sub-projects. 81. However, the exact amount of budget for resettlement activities at the two bridge sites will be confirmed after the detailed design. The following table presents the types of costs for compensation of land and other assets, some of the anticipated institutional costs (for implementation, M&E, costs of staff, and capacity building). The costs of the land survey and resettlement / safeguards specialists will be included in the project management and administration costs. Item Cost (FJ$) Compensation for landowners $ 30,000 Compensation/assistance for land users 5,000 Sub-total 35,000 Income support for vulnerable people 2,000 Compensation for crops and trees: 2,667 Staff training 5,000 Costs of FRA activities related to updating and 25,000 implementing LARP Monitoring and Evaluation 10,000 Training, administration and survey costs 30,010 Contingencies 20% 13,535 Grand Total FJ$: 123,212 USD equivalent: 66,411 L. Monitoring and Reporting 32 82. The FRA will monitor all activities associated with land acquisition and payment of compensation to DPs. The scope of monitoring includes: (i) compliance with the agreed policies and procedures for land acquisition; (ii) prompt approval, allocation and disbursement of compensation payments to DPs, including if necessary, supplemental compensation for additional and/or unforeseen losses; and, (iii) remedial actions, as required. The monitoring will also cover the social impacts of the project and whether DPs are able to restore and preferably improve, their pre-project living standards, incomes, and productive capacity. A set of monitoring and evaluation indicators are in Annex 4. Specific subproject level indicators will be included in the LARP. 83. The FRA will prepare and submit semi-annual progress reports to ADB and WB as part of project performance monitoring. FRA will also submit subproject completion reports to ADB and WB for each site when compensation has been paid. 84. FRA will coordinate with DOL and TLTB as well as Provincial and District administrators in monitoring activities associated with land acquisition. 32 Appendix ____ 33 Annex 1: Screening Form Project Title: Loan No: Subproject: Date: Location and impact area: Probable Land Acquisition/Resettlement Effects Not Yes No Remarks Known Acquisition of Land 1. Will there be land acquisition? 2. Is the site for land acquisition known? 3. Is the ownership status and current usage of land to be acquired known? 4. Will easement be utilized within an existing Right of Way (ROW)? 5. Will there be loss of shelter or residential land due to land acquisition? 6. Will there be loss of agricultural and other productive assets due to land acquisition? 7. Will there be losses of crops, trees, or fixed assets due to land acquisition? 8. Will there be loss of businesses or enterprises due to land acquisition? 9. Will there be loss of income sources and means of livelihoods due to land acquisition? Restrictions on land use or on access 10. Will people lose access to natural resources, communal facilities or services? 11. If land use is changed, will it have an adverse impact on social and economic activities? 12. Will access to land and resources owned communally or by the state be restricted? Information on Displaced Persons: Any estimate of the likely number of persons that will be displaced by the Project? [ ] No [ ] Yes If yes, approximately how many? ______________________ 6 Category for resettlement impacts: A [ ] B [ ] C [ ] Are any of them poor, female-heads of households, or vulnerable to poverty risks? [ ] No [ ] Yes Are any displaced persons from indigenous or ethnic minority groups? [ ] No [ ] Yes Note: Please attach additional information on the project, as necessary. 6 Impacts are classified as Category A when 200 or more persons experience major resettlement impacts either through being physically displaced from housing, or losing 10% or more of their productive (income generating) assets. Not significant impacts (i.e. other than Category A) will be classified as Category B. No impacts will be classified as Category C. 34 Annex 2: Outline of Land Acquisition and Resettlement Plan A. Executive Summary: It provides a concise scope, entitlements and activities. B. Project Description: It introduces the project, and projects components with land acquisition or 
resettlement. It also describes the alternatives considered to avoid or minimize impacts. C. Scope of Land Acquisition and Resettlement: This section discusses the project’s 
potential impacts; describes the scope of land acquisition and explains why it is necessary; 
and summarizes the key effects D. Socio economic Information and Profile: The section outlines the results of the 
 assessment of social impacts: a. defines, identifies, and enumerates the people to be affected; b. describes the likely impacts of the land and asset acquisition; c. discusses the project’s impacts on the poor , and other vulnerable groups; identifies gender and resettlement impacts. E. Information Disclosure, Consultations, and Participation. This section: a. identifies project stakeholders, especially primary stakeholders; b. describes the consultation and participation mechanisms; c. describes the activities undertaken to disseminate information; d. summarizes the results of consultations; e. confirms disclosure of the draft RP to affected persons; and f. describes the planned information disclosure and consultation measures F. Grievance Redress Mechanisms. This section describes mechanisms to receive and facilitate the resolution of affected persons’ concerns and grievances. It explains how the procedures are accessible to affected persons and gender sensitive. G. Legal Framework. This section: a. describes national laws and ADB and WB’s policy requirement; and gap-filing measures. b. describes the legal and policy for all types of displaced person; c. outlines the principles and methodologies used for determining valuations and compensation rates; and set out the compensation and assistance eligibility criteria H. Entitlements, Assistance and Benefits. This section: a. Defines DPs entitlements and eligibility, (includes an entitlement matrix); b. Specifies all assistance to vulnerable groups; and. c. Outlines opportunities for DPs to derive appropriate benefits from project. I. Relocation of Housing and Settlement. This section, if relevant: a. Describes options for relocating housing and other structures; b. Describes alternative relocation sites considered; community consultations; c. Provides timetables for site preparation and transfer; d. Describes the legal arrangements to regularize tenure; 34 Appendix ____ 35 e. Outlines measures to assist DPs with their transfer and establishment at new sites; f. Describes plans to provide civic infrastructure; and g. Explains how integration with host populations will be carried out. J. Income Restoration and Rehabilitation. This section, (as relevant): a. Identifies livelihood risks and prepare disaggregated tables based on demographic data and livelihood sources; b. describes income restoration programs, including multiple options from restoring all types of livelihoods; c. outlines measures to provide social safety net; d. describes special measures to support vulnerable groups; e. describes training programs. K. Resettlement Budget and Financial Plan. This section: a. Provides an itemized budget for all resettlement activities. b. Describes the flow of funds. c. Includes a justification for all assumptions made in calculating compensation rates. d. Includes information about the source of funding for the resettlement plan budget. L. Institutional Arrangements. This section: a. Describes institutional arrangement responsibilities and mechanisms. b. Includes institutional capacity building program. c. Describes roles of NGO’s, if involved, and organizations of affected persons. d. Describes how women’s groups will be involved. M. Implementation Schedule: This section includes a detailed, time bound, implementation schedule for all key resettlement and rehabilitation activities.
 N. Monitoring and Reporting: This section describes the mechanisms and indicators appropriate to the project for monitoring and evaluating the implementation of the resettlement plan. It specifies arrangements for participation of affected persons in the monitoring process. This section will also describe reporting procedures. 36 Annex 3: Terms of Reference (TOR) Social Safeguards/Resettlement Specialists Specialists will have a graduate degree in social science or similar fields and experience (10 years for international and 5 years for national) in conducting social assessments and preparing land acquisition and resettlement plan (LARP) in developing countries. The international specialist will take a lead and national specialist will assist the international specialist in undertaking all relevant tasks. FRA’s social impact manager i) Review the project documents, including the RRP, loan documents, the land acquisition and resettlement framework (LARF), LARP, and other relevant reports (available at FRA and/or ADB and WB websites) and visit the project sites to familiarize with the project’s safeguard requirements and the implementation status. ii) Facilitate preparation and updating of LARPs by Design and Supervision Consultants (See TOR for DSC consultants). Review draft LARPs submitted by DSC, arrange FRA’s endorsement and submit these to ADB and WB for clearance. iii) Develop and maintain the project’s information management system/database on social safeguard aspects, including a system to track the project’s relevant documents and records. Maintain an up-to-date collection/library of relevant safeguard documents. iv) Develop and maintain the system for effective management and implementation of land acquisition and resettlement activities, and other relevant activities. Assist FRAin implementation and reporting on these activities in compliance with the project’s requirements on social safeguards. v) Undertake monitoring of the resettlement and relevant activities on social safeguards. Monitor the livelihoods and living standards of the APs by conducting field visits and consultations with the APs and stakeholders. Develop remedial actions in case any gaps are identified to meet the project’s safeguard objectives. vi) Prepare semi-annual monitoring reports with adequate information meeting ADB and WB requirements for submission by FRA to ADB and WB. Coordinate with ADB and WB’s safeguard specialist to review and clear the report. Assist in conducting any field review by ADB and WB on the social safeguard compliance. vii) Assist FRA in mobilization of the third-party experts, if needed, and assist them in conducting their activities by providing relevant information, etc. viii) Undertake periodic consultations with APs and stakeholders and assist FRA for disclosure of relevant information to comply with the project’s relevant requirements. Maintain proper documentation of consultation and disclosure activities. ix) Facilitate implementation of the project’s grievance redress mechanism (GRM). Monitor status of grievances, facilitate their resolution, maintain documentation, and report the progress through monitoring reports. x) Conduct necessary capacity building for FRA staff, government agencies and other stakeholders on project-related and ADB and WB’s requirements on safeguards. xi) Coordinate with the environment manager and other FRA specialists, government counterparts, and other relevant stakeholders for implementation and monitoring on safeguards. In coordination with the environment specialist, monitor compliance on social aspects of the civil works contracts. Prepare a social management plan in case significant social impacts are identified that cannot be addressed by the environment assessment or existing plans. xii) Perform relevant tasks assigned by FRA, independently or in coordination with other specialists, to meet the project’s requirements on social safeguards. 36 Appendix ____ 37 Social Safeguards/Resettlement Specialist under DSC Consultants (International 18 pm; national 36 pm) (i) Review the scope and activities of the proposed subprojects and screen their potential impacts on land acquisition/involuntary resettlement (IR) and indigenous peoples (IPs). (ii) Conduct surveys, interviews and focus-group discussions to collect data for assessment of social impacts and preparation of safeguard planning documents. (iii) Coordinate with relevant government agencies for necessary information on affected land and land-based assets, and for coordination with the government's formal land acquisition procedures in accordance with relevant laws on land acquisition. (iv) Prepare land acquisition and resettlement plan (LARP) for subprojects involving physical or economic displacements due to land acquisition or restriction on land use or access. The LARP must be based on the census of affected persons (APs), inventory of losses, and socio-economic survey of APs. The LARP must meet the requirements of ADB Safeguard Policy Statement (SPS) and World Bank’s Operational Policy (O.P.) 4.12 on Involuntary Resettlement as well as relevant country laws as stipulated in the Land Acquisition and Resettlement Framework (RF), and should include gap-filling measures in case of any gaps between the SPS and country laws. The contents of the LARP should follow the outline of the SPS as provided in the LARF. (v) Undertake due diligence on IPs, undertake adequate consultation with local communities and prepare a summary document confirming broad community support of local communities of the subproject. Include such report in the feasibility report to be submitted to ADB and WB. (vi) In coordination with the FRA and relevant government agencies, undertake consultations with APs and other stakeholders and disclose relevant information including the draft safeguard documents in accordance with the country’s laws and ADB’s PS and WB’s OP 4.12. Develop a grievance redress mechanism for relevant subprojects. (vii) Develop schedule to implement and monitor the LARP at subproject level. (viii) Conduct workshops and meetings, and provide guidance to FRA’s social impact manager on project-related resettlement issues and ADB and WB’s policy and procedural requirements on social safeguards. (ix) Submit draft safeguard documents to ADB and WB through FRA and finalize these incorporating comments from ADB and WB and FRA. (x) Provide inputs to the team leader on social safeguards required for other project documents. 38 Annex 4: Indicators Type of Indicator Examples of Variables Indicator Process Staffing Recruitment of FRA’s social impact manager. indicators Engagement of safeguards staff and training No. of other agency officials available for tasks Consultation, No. of consultation and participation programs held with participation, and various stakeholders grievance resolution No. of field visits by FRA’s social impact manager. Procedures in Effectiveness of compensation/assistance delivery operation system Coordination between FRA and other GoF agencies and civil society groups Output Households No. of households affected indicators Structures No. of community structures, if any, moved Land, Economic No. of households receiving agreed compensation for trees & crops land, trees and crops Assistance to APs No. of households that have participated in income restoration and livelihood enhancement measures No. of special assistance programs to vulnerable households Impact Household earning Employment status of households having a formal job indicators capacity Employment status of households being self-employed No. of women engaged as waged workers by the Project Special assistance to Type of Project-related skills women received. women Average wage of women employed on Project compared to that of men Other livelihood Increase in market-based incomes of farmers indicators Increase in ownership of household assets Increased access to schooling and health services Increase in visits by GoF service providers 38