PROCUREMENT PLAN (Textual Part) Project information: [country] [Project name] [P-number] Project Implementation agency: [insert legal name] Date of the Procurement Plan: [insert date] Period covered by this Procurement Plan: [insert from – to period] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Mali : Mali Governance of Mining Sector PLAN General Information Country: Mali Bank’s Approval Date of the Original Procurement Plan: 2020-01-31 2021-02-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P164242 GPN Date: Project Name: Mali Governance of Mining Sector Loan / Credit No: IDA / 64470, IDA / V2610 Mali Governance of Mining Sector Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-PASM-155207-GO-RFB / Equipement du laboratoire du Component E: Project Single Stage - One En attente programme pour le IDA / 64470 A posteriori Appel d'offres Open - National 1,000,000.00 0.00 2020-06-20 2020-06-25 2020-08-06 2020-09-05 2020-10-10 2021-04-08 Coordination Envelope d'exécution Développement des Ressources Minérales PDRM ML-PASM-155181-GO-RFB / Equipement de la Direction Component E: Project Single Stage - One En attente Nationale de la Géologie et IDA / 64470 A posteriori Appel d'offres Open - National 350,000.00 0.00 2020-06-25 2020-06-30 2020-08-11 2020-09-10 2020-10-15 2021-04-13 Coordination Envelope d'exécution des Mines en moyens de locomotion ML-PASM-155266-GO-RFB / Equipement de la DNGM en matériels informatiques Ordinateurs, imprimante, Component E: Project Single Stage - One En attente IDA / 64470 A posteriori Appel d'offres Open - National 400,000.00 0.00 2020-06-30 2020-07-05 2020-08-16 2020-09-15 2020-10-20 2021-04-18 traceur, scanner A0, et Coordination Envelope d'exécution logiciels Arc GIS, SURPAC, Data Mine et renforcement de capacité ML-PASM-155189-GO-RFQ / Component E: Project Single Stage - One En attente Acquisition logiciel comptable IDA / 64470 A posteriori Demande de prix Limited 55,000.00 0.00 2020-03-04 2020-04-29 2020-10-26 Coordination Envelope d'exécution TOM2Pro ML-PASM-155161-GO-RFB / Component E: Project Single Stage - One En attente Acquisition de deux véhicules IDA / V2610 A posteriori Appel d'offres Open - National 140,000.00 0.00 2020-03-29 2020-04-03 2020-05-15 2020-06-14 2020-07-19 2020-08-04 Coordination Envelope d'exécution Wagon et berline ML-PASM-155090-GO-RFQ / Acquisition de mobiliers de Component E: Project Single Stage - One En attente IDA / V2610 A posteriori Demande de prix Limited 45,000.00 0.00 2020-02-20 2020-04-16 2020-05-16 bureau et matériels Coordination Envelope d'exécution informatiques ML-PASM-166138-GO-RFQ / Component E: Project Single Stage - One En attente Acquisition et installation des IDA / 64470 A posteriori Demande de prix Limited 50,000.00 0.00 2020-04-06 2020-04-28 2020-05-08 Coordination Envelope d'exécution mobiliers de bureau ML-PASM-166139-GO-RFQ / Component E: Project Single Stage - One Acquisition et installation des IDA / 64470 A posteriori Demande de prix Limited 50,000.00 35,297.32 Achevé 2020-04-11 2020-05-04 2020-04-21 2020-06-03 2020-05-11 2020-06-10 Coordination Envelope matériels informatiques ML-PASM-167473-GO-DIR / Passation de Component E: Project En attente Mise en place d'un système IDA / 64470 A posteriori marché de gré à Direct 40,000.00 0.00 2020-04-03 2020-04-08 2020-05-13 2020-11-09 Coordination d'exécution visioconférence du PGSM gré ML-PASM-166137-GO-RFQ / Passation de Acquisition d'un (1) véhicule Component E: Project IDA / 64470 A posteriori marché de gré à Direct 50,000.00 40,982.80 Achevé 2020-04-03 2020-04-01 2020-04-05 2020-04-06 2020-04-09 2020-04-07 2020-04-19 2020-04-21 pick double cabine tout Coordination gré terrain ML-PASM-166134-GO-RFB / Acquisition de cinq (05) Component E: Project Single Stage - One véhicules (1 station wagon IDA / 64470 A posteriori Appel d'offres Open - National 350,000.00 264,091.75 Signé 2020-04-03 2020-03-20 2020-04-08 2020-07-09 2020-05-08 2020-03-23 2020-05-18 2020-04-24 2020-06-16 2020-05-27 2020-07-16 Coordination Envelope 4x4, 3 pick up 4x4 double cabine et 1 berline) ML-PASM-167959-GO-DIR / Acquisition des kits sanitaires Passation de Component E: Project En cours pour les associations IDA / 64470 A priori marché de gré à Direct 70,000.00 0.00 2020-04-07 2020-08-27 2020-04-09 2020-04-13 2020-05-03 Coordination d'exécution feminines des zones minières gré du Mali ML-PASM-171451-GO-RFQ / Acquisition des matériels Component E: Project Single Stage - One didactiques et audio-visuels IDA / 64470 A posteriori Demande de prix Limited 45,000.00 12,846.68 Signé 2020-05-20 2020-06-02 2020-07-15 2020-06-22 2020-07-30 Coordination Envelope pour la DNGM au compte du PGSM ML-PASM-171478-GO-RFB / Acquisition des matériels pour Component E: Project Single Stage - One En cours les laboratoires de la DNGM et IDA / 64470 A posteriori Appel d'offres Open - National 1,365,000.00 0.00 2020-05-29 2020-06-12 2020-06-03 2020-07-15 2020-08-14 2020-09-18 2021-03-17 Coordination Envelope d'exécution du PDRM en deux (2) lots au compte du PGSM ML-PASM-171485-GO-RFQ / Acquisition des matériels Component E: Project Single Stage - One En cours IDA / 64470 A posteriori Demande de prix Limited 45,000.00 75,767.59 2020-05-20 2020-06-02 2020-07-15 2020-07-30 informatiques pour la DNGM Coordination Envelope d'exécution au compte du PGSM ML-PASM-171488-GO-RFB / Acquisition des véhicules pour Component E: Project Single Stage - One En cours IDA / 64470 A posteriori Appel d'offres Open - National 180,000.00 0.00 2020-05-14 2020-05-27 2020-05-19 2020-06-30 2020-07-06 2020-07-30 2020-07-08 2020-09-03 2020-11-02 la DNGM et le PDRM au Coordination Envelope d'exécution compte du PGSM Page 1 ML-PASM-173627-GO-RFQ / Component A: Creating Acquisition d'équipement de conditions for growth and Single Stage - One En attente contrôle de la qualité de IDA / 64470 A posteriori Demande de prix Limited 50,000.00 0.00 2020-05-26 2020-07-21 2020-09-09 diversification of the mineral Envelope d'exécution l’environnement pour la sector DNGM ML-PASM-182984-GO-RFQ / Acquisition de matériels Component E: Project Single Stage - One En cours IDA / 64470 A posteriori Demande de prix Limited 50,000.00 0.00 2020-07-12 2020-09-06 2021-03-05 informatiques pour la Coordination Envelope d'exécution Direction Générale des Impôts ML-PASM-212731-GO-RFQ / Component B: Strengthening Single Stage - One En attente Acquisition de deux véhicules IDA / 64470 Revenue Transparency and A posteriori Demande de prix Limited 100,000.00 0.00 2021-01-27 2021-03-24 2021-09-20 Envelope d'exécution Pick-Up DC 4x4 Tout Terrain Governance ML-PASM-212778-GO-RFQ / Acquisition des pétits matériels d'opaillage (broyeurs, concasseurs, détecteurs de métaux, tables Component C: Maximizing Single Stage - One En attente de lavage gravimétrique et IDA / 64470 the Local Development A posteriori Demande de prix Limited 73,000.00 0.00 2021-05-08 2021-07-03 2021-12-30 Envelope d'exécution kits d'Equipement de Impact of Mining Protection Individuelle ) pour la mise en place des unités pilote de démonstration des mineur NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-PASM-155261-CS-QCBS / Elaboration de la Component A: Creating Sélection fondée Cartographie géologique à conditions for growth and En cours IDA / 64470 A priori sur la qualité et le Open - International 3,000,000.00 0.00 2020-09-30 2020-09-23 2020-10-21 2020-10-31 2020-12-04 2021-01-15 2021-01-01 2021-01-31 2021-03-07 2021-04-11 2022-04-11 l’échelle du 1/50 000 des diversification of the mineral d'exécution coût zones prospectives couvrant sector 14 feuilles topo ML-PASM-155367-CS-QCBS / Assistance Technique pour Soutien à l’orpaillage et à la petite mine par l’exécution de Component A: Creating Sélection fondée travaux géologiques pour conditions for growth and En attente IDA / 64470 A priori sur la qualité et le Open - International 400,000.00 0.00 2020-09-15 2020-10-06 2020-11-19 2020-12-17 2021-01-16 2021-02-20 2021-03-27 2022-03-27 définir des cibles et zones diversification of the mineral d'exécution coût prospectives et formation des sector acteurs dans les techniques d’interprétation des données de base ML-PASM-155373-CS-QCBS / Diagnostic de Component A: Creating l'environnement minier et la Sélection fondée conditions for growth and En attente Mise à jour de la IDA / 64470 A priori sur la qualité et le Open - International 250,000.00 0.00 2020-10-15 2020-11-05 2020-12-19 2021-01-16 2021-02-15 2021-03-22 2021-04-26 2022-04-26 diversification of the mineral d'exécution réglementation minière afin coût sector d’encourager la diversification minière ML-PASM-155073-CS-QCBS Component A: Creating Sélection fondée / Revue et optimisation du conditions for growth and En attente IDA / 64470 A priori sur la qualité et le Open - International 250,000.00 0.00 2020-10-10 2020-10-31 2020-12-14 2021-01-11 2021-02-10 2021-03-17 2021-04-21 2021-10-18 régime fiscal pour toutes les diversification of the mineral d'exécution coût activités minières sector ML-PASM-155202-CS-QCBS / Elaboration d’un cadre réglementaire spécifique en Component A: Creating Sélection fondée matière d’environnement, de conditions for growth and En attente IDA / 64470 A priori sur la qualité et le Open - National 250,000.00 0.00 2020-10-30 2020-11-20 2021-01-03 2021-01-31 2021-03-02 2021-04-06 2021-05-11 2022-05-11 santé et de sécurité par diversification of the mineral d'exécution coût rapport à la phase sector d’exploitation et la phase de fermeture de mine ML-PASM-155235-CS-CQS / Component A: Creating Sélection fondée Etudes stratégiques Socio- conditions for growth and sur les En attente IDA / 64470 A priori Open - International 250,000.00 0.00 2020-11-10 2020-12-01 2021-01-14 2021-02-13 2021-03-20 2021-09-16 Environnementales pour les diversification of the mineral qualifications des d'exécution secteurs minier et pétrolier sector consultants ML-PASM-155239-CS-QCBS Component A: Creating / Assistance Technique pour Sélection fondée conditions for growth and En attente la mise en œuvre du Volet A3 IDA / 64470 A priori sur la qualité et le Open - International 1,200,000.00 0.00 2020-12-31 2021-01-21 2021-03-06 2021-04-03 2021-05-03 2021-06-07 2021-07-12 2022-07-12 diversification of the mineral d'exécution Reforme institutionnelles et coût sector renforcement des capacités ML-PASM-155217-CS-QCBS / Etudes géologiques pour Component C: Maximizing Sélection fondée délimiter des couloirs afin En attente IDA / 64470 the Local Development A priori sur la qualité et le Open - International 400,000.00 0.00 2020-12-13 2021-01-03 2021-02-16 2021-03-16 2021-04-15 2021-05-20 2021-06-24 2022-06-24 installer les acteurs de d'exécution Impact of Mining coût l’exploitation minière artisanale et à petite échelle ML-PASM-155152-CS-CQS / Identifier et évaluer les opportunités techniquement Sélection fondée Component C: Maximizing et économiquement sur les En attente IDA / 64470 the Local Development A priori Open - National 150,000.00 0.00 2020-08-10 2020-08-31 2020-10-14 2020-11-13 2020-12-18 2021-06-16 réalisables pour l’intégration qualifications des d'exécution Impact of Mining des mines à l’énergie, consultants notamment dans le domaine de l’énergie solaire ML-PASM-155173-CS-LCS / Component E: Project Sélection au En attente Audit financier et comptable IDA / 64470 A posteriori Open - National 50,000.00 0.00 2020-06-12 2020-07-03 2020-08-16 2020-09-13 2020-10-13 2020-11-17 2020-12-22 2021-06-20 Coordination moindre coût d'exécution exercices 2020, 2021 et 2022 Page 2 ML-PASM-155187-CS-CQS / Component A: Creating Sélection fondée Etude sur la traçabilité des conditions for growth and sur les En cours IDA / V2610 A posteriori Open - National 200,000.00 0.00 2020-12-20 2019-12-23 2021-01-10 2020-07-16 2021-02-23 2020-04-24 2021-03-25 2020-07-03 2021-04-29 2021-10-26 revenus miniers au niveau des diversification of the mineral qualifications des d'exécution collectivité territoriales sector consultants ML-PASM-155176-CS-CQS / Sélection fondée Etude sur la possibilité de Component C: Maximizing sur les En attente mise en place d'un centre IDA / 64470 the Local Development A posteriori Open - National 50,000.00 0.00 2020-02-25 2020-03-17 2020-04-30 2020-05-30 2020-07-04 2020-12-31 qualifications des d'exécution d'incubation pour Impact of Mining consultants l'entreprenariat minier Sélection fondée ML-PASM-155357-CS-CQS / Component C: Maximizing sur les En attente Etude sur la mise en place IDA / 64470 the Local Development A posteriori Open - National 150,000.00 0.00 2020-02-28 2020-03-20 2020-05-03 2020-06-02 2020-07-07 2021-01-03 qualifications des d'exécution d'une synergie mine energie Impact of Mining consultants ML-PASM-155194-CS-CQS / Sélection fondée Component C: Maximizing Selection d'un consultant pour sur les En attente IDA / 64470 the Local Development A posteriori Open - National 150,000.00 0.00 2020-03-10 2020-03-31 2020-05-14 2020-06-13 2020-07-18 2021-01-14 organiser les orpailleurs en qualifications des d'exécution Impact of Mining groupement et association consultants ML-PASM-155370-CS-QCBS / Etudes de création de liens Sélection fondée Component C: Maximizing économiques entre l’industrie sur les En attente IDA / 64470 the Local Development A posteriori Open - National 100,000.00 0.00 2020-04-03 2020-04-18 2020-04-28 2020-05-28 2020-06-12 2020-08-11 locales et les projets et qualifications des d'exécution Impact of Mining opérations minières consultants Evaluation des opportunités ML-PASM-155366-CS-CQS / Sélection fondée Component B: Strengthening Service de consultant pour sur les En attente IDA / V2610 Revenue Transparency and A priori Open - National 500,000.00 0.00 2020-04-03 2020-04-24 2020-06-07 2020-07-07 2020-08-11 2020-12-09 l’elaboration des rapports ITIE qualifications des d'exécution Governance Mali 2017 et 2018 consultants ML-PASM-173623-CS-QCBS / Service de consultant relatif Component A: Creating à la réalisation de la Sélection fondée conditions for growth and En cours campagne géophysique IDA / 64470 A priori sur la qualité et le Open - International 4,000,000.00 0.00 2020-05-20 2020-09-02 2020-06-10 2020-09-09 2020-07-24 2021-01-08 2020-08-21 2020-09-20 2020-10-25 2020-11-29 2021-11-29 diversification of the mineral d'exécution aéroportée (Magnétométrie coût sector Radiométrie et EM) sur les zones Ouest et Sud du Mali ML-PASM-182978-CS-QCBS / RECRUTEMENT D’UN BUREAU DE CONSULTANTS Component A: Creating POUR LA DEFINITION D’UN Sélection fondée conditions for growth and En cours MODELE DE DONNEES GEO IDA / 64470 A priori sur la qualité et le Open - International 2,000,000.00 0.00 2020-07-07 2020-07-13 2020-07-28 2020-10-31 2020-09-10 2021-01-08 2020-10-08 2020-11-07 2020-12-12 2021-01-16 2022-01-16 diversification of the mineral d'exécution SCIENTIFIQUES EN VUE DE coût sector L’AMELIORATION DE LA BASE NATIONALE DES DONNEES GEOLOGIQUES DU MALI ML-PASM-182992-CS-QCBS / Réalisation de la Component A: Creating Sélection fondée cartographie géologique de conditions for growth and En cours IDA / 64470 A priori sur la qualité et le Open - International 2,000,000.00 0.00 2020-07-07 2020-09-17 2020-07-28 2020-10-31 2020-09-10 2021-01-10 2020-10-08 2020-11-07 2020-12-12 2021-01-16 2022-01-16 trois degrés carrés de la zone diversification of the mineral d'exécution coût du Sud du Mali à l'échelle sector 1/200 000 ML-PASM-182993-CS-QCBS / Développement d'une étude Component A: Creating sur la "prospectivité minérale Sélection fondée conditions for growth and En cours des test-zone" sur la base des IDA / 64470 A priori sur la qualité et le Open - International 1,500,000.00 0.00 2020-07-07 2020-07-28 2020-09-10 2020-10-08 2020-11-07 2020-12-12 2021-01-16 2022-01-16 diversification of the mineral d'exécution données cartographiques (SIG coût sector géologiques), géophysiques et géochimiques ML-PASM-155211-CS-QCBS / Réalisation de la campagne Component A: Creating Sélection fondée de cartographie géophysique conditions for growth and En cours IDA / 64470 A priori sur la qualité et le Open - International 2,000,000.00 0.00 2020-07-15 2020-09-17 2020-08-05 2020-11-01 2020-09-18 2021-01-11 2020-10-16 2020-11-15 2020-12-20 2021-01-24 2022-01-24 de 4 degrés carrés de la zone diversification of the mineral d'exécution coût Ouest du Mali à l'échelle sector 1/200 000 ML-PASM-212743-CS-CQS / Service de consultant pour Component A: Creating Sélection fondée l'élaboration d'une conditions for growth and sur les En attente réglementation nationale sur IDA / 64470 A posteriori Open - National 93,500.00 0.00 2021-01-25 2021-02-15 2021-03-31 2021-04-30 2021-06-04 2021-12-01 diversification of the mineral qualifications des d'exécution la gestion des produits sector consultants chimiques et explosifs civils et accessoires ML-PASM-212747-CS-CQS / Service de consultant pour la Sélection fondée réalisation de l'étude de Component B: Strengthening sur les En attente faisabilité technique et la mise IDA / 64470 Revenue Transparency and A posteriori Open - National 85,000.00 0.00 2021-02-02 2021-02-23 2021-04-08 2021-05-08 2021-06-12 2021-12-09 qualifications des d'exécution en œuvre de l'intégration des Governance consultants données de l'ITIE dans une plate-forme numérique ML-PASM-212767-CS-QCBS Component A: Creating / Service de consultant relatif Sélection fondée conditions for growth and En attente à la formations des cadres de IDA / 64470 A posteriori sur la qualité et le Open - National 27,500.00 0.00 2021-10-01 2021-10-22 2021-12-05 2022-01-02 2022-02-01 2022-03-08 2022-04-12 2023-04-12 diversification of the mineral d'exécution la DNACPN sur des thèmes coût sector spécifiques ML-PASM-212768-CS-QCBS Component B: Strengthening Sélection fondée / Service de consultant relatif En attente IDA / 64470 Revenue Transparency and A posteriori sur la qualité et le Open - National 92,000.00 0.00 2021-01-25 2021-02-15 2021-03-31 2021-04-28 2021-05-28 2021-07-02 2021-08-06 2022-08-06 à l'élaboration du rapport ITIE d'exécution Governance coût 2019 ML-PASM-212775-CS-QCBS Component C: Maximizing Sélection fondée / Service de consultant relatif En attente IDA / 64470 the Local Development A posteriori sur la qualité et le Open - National 27,500.00 0.00 2021-02-15 2021-03-08 2021-04-21 2021-05-19 2021-06-18 2021-07-23 2021-08-27 2022-08-27 à l'élaboration d'un manuel de d'exécution Impact of Mining coût gestion des sites d'orpaillage ML-PASM-212781-CS-QCBS / Surveillance et contrôle satellitaire à haute résolution Component C: Maximizing Sélection fondée En attente et cartographie détaillée des IDA / 64470 the Local Development A priori sur la qualité et le Open - International 720,000.00 0.00 2021-01-25 2021-02-15 2021-03-31 2021-04-28 2021-05-28 2021-07-02 2021-08-06 2022-08-06 d'exécution couloirs d’orpaillage des Impact of Mining coût zones d’orpaillage de Kéniéba, Kangaba, Yanfolila et Bagoé INDIVIDUAL CONSULTANTS Page 3 Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-PASM-155264-CS-INDV / Elaboration d’une stratégie Component A: Creating Réglementation sociale, conditions for growth and En attente IDA / 64470 A posteriori Individuel Open 90,000.00 0.00 2020-08-20 2020-10-08 2020-10-29 2020-12-03 2021-06-01 directive sur le genre et le diversification of the mineral d'exécution travail des enfants dans le sector domaine de l’artisanat miniers ML-PASM-155364-CS-INDV Component E: Project En attente / Elaboration du manuel IDA / V2610 A posteriori Individuel Direct 15,000.00 0.00 2020-03-20 2020-03-30 2020-04-20 2020-05-25 2020-11-21 Coordination d'exécution d’exécution du projet ML-PASM-155203-CS-INDV Component C: Maximizing / Elaboration du decret En attente IDA / 64470 the Local Development A posteriori Individuel Open 40,000.00 0.00 2020-05-30 2020-07-18 2020-08-08 2020-09-12 2021-03-11 d'application du code minier d'exécution Impact of Mining 2019 ML-PASM-155226-CS-INDV Component E: Project En attente / Spécialiste en gestion IDA / 64470 A posteriori Individuel Open 288,000.00 0.00 2020-01-01 2020-02-19 2020-03-11 2020-04-15 2020-10-12 Coordination d'exécution financière ML-PASM-155197-CS-INDV Component E: Project En attente / Spécialiste en passation de IDA / 64470 A posteriori Individuel Open 288,000.00 0.00 2020-01-01 2020-02-19 2020-03-11 2020-04-15 2020-10-12 Coordination d'exécution marchés ML-PASM-155256-CS-INDV Component E: Project En attente / Spécialiste en suivi- IDA / 64470 A posteriori Individuel Open 200,000.00 0.00 2020-05-30 2020-07-18 2020-08-08 2020-09-12 2021-03-11 Coordination d'exécution évaluation ML-PASM-155253-CS-INDV Component E: Project En attente / Spécialiste en sauvegarde IDA / 64470 A posteriori Individuel Open 200,000.00 0.00 2020-05-30 2020-07-18 2020-08-08 2020-09-12 2021-03-11 Coordination d'exécution environnementale ML-PASM-155230-CS-INDV Component E: Project En attente / Spécialiste en IDA / 64470 A posteriori Individuel Open 200,000.00 0.00 2020-05-30 2020-07-18 2020-08-08 2020-09-12 2021-03-11 Coordination d'exécution developpement sociale ML-PASM-155245-CS-INDV Component E: Project En cours IDA / 64470 A posteriori Individuel Open 200,000.00 0.00 2020-05-30 2020-02-03 2020-07-18 2020-04-14 2020-08-08 2020-04-22 2020-09-12 2021-03-11 / Comptable Coordination d'exécution ML-PASM-155099-CS-INDV Component E: Project IDA / 64470 A posteriori Individuel Open 200,000.00 152,477.12 Signé 2020-06-30 2020-01-31 2020-08-18 2020-04-27 2020-09-08 2020-05-19 2020-10-13 2020-05-19 2021-04-11 / Auditeur interne Coordination ML-PASM-155257-CS-INDV Component E: Project En attente IDA / 64470 A posteriori Individuel Open 70,200.00 0.00 2020-04-30 2020-06-18 2020-07-09 2020-08-13 2021-02-09 / Assistant Administratif Coordination d'exécution ML-PASM-155252-CS-INDV Component E: Project En attente / Spécialiste en industrie IDA / 64470 A priori Individuel Open 288,000.00 0.00 2020-04-03 2020-05-22 2020-06-12 2020-07-17 2021-01-13 Coordination d'exécution extrative ML-PASM-155201-CS-INDV Component E: Project En attente IDA / 64470 A priori Individuel Open 382,500.00 0.00 2020-04-03 2020-05-23 2020-06-13 2020-07-18 2021-01-14 / Coordinateur du PASM Coordination d'exécution ML-PASM-155248-CS-CDS / Conventions de collaboration avec la Chambre des Mines Component C: Maximizing Sélection de pour la Création d’une En attente IDA / 64470 the Local Development A priori consultants par Direct 1,200,000.00 0.00 2020-07-10 2020-07-20 2020-09-23 2021-03-22 plateforme d’échange, Mettre d'exécution Impact of Mining entente directe en œuvre les recommandations du plan d’action gouvernemental ML-PASM-173630-CS-INDV / Service de consultant pour Component E: Project En attente IDA / 64470 A posteriori Individuel Open 100,000.00 0.00 2020-07-07 2020-08-25 2020-09-15 2020-10-20 2021-04-18 le Recrutement d'un Assistant Coordination d'exécution en Passation de Marchés ML-PASM-155380-CS-CDS / Sélection de Formation des vérificateurs du Component E: Project En cours IDA / 64470 A posteriori consultants par Direct 50,000.00 0.00 2020-07-27 2020-09-16 2020-08-11 2020-09-18 2020-10-15 2020-11-14 BVG dans le domaine des Coordination d'exécution entente directe mines ML-PASM-212724-CS-INDV / Service de consultant relatif Component E: Project En attente à l'Etablissement de la IDA / 64470 A posteriori Individuel Limited 28,000.00 0.00 2021-01-18 2021-01-23 2021-02-13 2021-03-20 2021-09-16 Coordination d'exécution situation de référence du PGSM ML-PASM-212727-CS-INDV / Service de consultant relatif Component E: Project En attente IDA / 64470 A posteriori Individuel Limited 28,000.00 0.00 2021-01-18 2021-01-23 2021-02-13 2021-03-20 2021-09-16 au Ciblage des bénéficiaires Coordination d'exécution directs du PGSM ML-PASM-212736-CS-INDV / Service de consultant pour Component A: Creating l'élaboration de guide de conditions for growth and En attente IDA / 64470 A posteriori Individuel Limited 56,000.00 0.00 2021-01-22 2021-01-27 2021-02-17 2021-03-24 2021-09-20 bonnes pratiques de gestion diversification of the mineral d'exécution environnementale (santé, sector sociales……) ML-PASM-212739-CS-INDV / Service de consultant pour Component A: Creating l'élaboration d'un guide et conditions for growth and En attente IDA / 64470 A posteriori Individuel Limited 56,000.00 0.00 2021-01-22 2021-01-27 2021-02-17 2021-03-24 2021-09-20 procédures de réhabilitation diversification of the mineral d'exécution et de fermetures des sites sector miniers ML-PASM-212746-CS-INDV Component A: Creating / Service de consultant pour conditions for growth and En attente la mise en place d’une base IDA / 64470 A posteriori Individuel Limited 37,500.00 0.00 2021-01-28 2021-02-02 2021-02-23 2021-03-30 2021-09-26 diversification of the mineral d'exécution de données et d’un cadastre sector environnemental Page 4