Details of the project procurement activities published under GPN. GENERAL PROCUREMENT NOTICE (GPN) Government of the Islamic Republic of Afghanistan Eshteghal Zaiee – Karmondena Project (EZ-Kar) Project ID No.: P166127 Implementing Agencies: 1. Ministry of Foreign Affairs (MoFA) 2. Independent Directorate of Local Governance (IDLG) 3. Kabul Municipality (KM) 4. Ministry of Economy (MoEc) Procurement of Goods, Works, Consultancy and Non-Consultancy Services for the EZ-Kar Project The Government of the Islamic Republic of Afghanistan (GoIRA) has been provided with a grant (US$ 50 million) from the Afghanistan Reconstruction Trust Fund (ARTF) and a grant (approximately US$ 150 million) from the International Development Association (IDA) of the World Bank Group, thus totaling grants of US$ 200 million, towards the cost of the Eshteghal Zaiee- Karmondena Project (EZ-Kar), and it intends to apply part of the proceeds of these grants to payments for goods, works, related non-consulting and consulting services to be procured under this project. PROJECT INFORMATION Since 2016, there have been a significant number of Afghan refugees returning to the country. The number of internally displaced within Afghanistan due to conflicts, droughts and mounting insecurity has also risen significantly. Together the returnees and IDPs have concentrated in some provinces and especially in some cities. The high influx of displaced populations in some areas has also added to the pressures on the host communities on limited resources, public infrastructure and economic and employment opportunities. The Project Development Objective (PDO) of the EZ-Kar is to strengthen the enabling environment for economic opportunities in cities where there is a high influx of displaced people. The EZ-Kar duration is from 2019 to 2023 (5 years), and includes a coverage/ target area of Afghan refugees in Pakistan, and the cities of Kabul City (Kabul Province), Jalalabad (Nangarhar), Kandahar City (Kandahar Province), Herat City (Herat Province), Puli Khumri (Baghlan), Maimana (Faryab), Ferozkoh/ Chaghcheran (Ghor), Khost Matun (Khost province), Asadabad (Kunar), Kunduz City (Kunduz Province), Mehtarlam (Laghman), Parun (Nuristan), and Taloqan (Takhar). The EZ-Kar essentially includes the following core components: Component #1: Regional and National Integration of Displaced Persons, to be implemented by the Ministry of Foreign Affairs (MOFA). It provides technical assistance, institutional support and training, necessary equipment, and operational assistance to MoFA to: (a) enhance its capacity to provide consular services (such as issuance of passports and verification of certificates); (b) develop and implement a joint communication strategy for MoFA and MoRR to disseminate information to Afghan refugees in Pakistan in order to facilitate their access to economic opportunities and social services through information centers at MoFA missions in selected cities of Pakistan, in collaboration with MoRR; and (c) support day-to-day implementation of this Component. Total budget = US$ 4.5 million. Component #2: Short Term Employment Opportunities, Reforms and Market-Based Infrastructure, to be implemented by the Independent Directorate of Local Governance (IDLG), via its urban Citizens’ Charter Afghanistan Project’s Project Implementation Unit (CCAP PIU). This component includes essentially a labor intensive, cash-for-work program (Maintenance and Construction Cash Grants) that targets poor households as beneficiaries, providing enough labor and payments to sustain the poor households through one lean season. Around 1,100 urban communities will be targeted with these MCCG grants of US$ 27,000 each. This Component also includes the establishment of urban Gozar Assemblies (GAs) and parallel Business Gozars (BGAs), each of which will receive a sum of US$ 200,000 for prioritized market-based infrastructure development/support. This Component will cover 12 of the 13 prioritized cities, except Kabul. Municipal-level regulatory reforms also fall under this Component. Total budget = US$ 120.5 million. Component #3: Prioritized Urban Investments in Four Provincial Capital Cities (PCCs), to be implemented by the IDLG, via its City Investment Project’s Project Implementation Unit (CIP PIU). This component will cover the cities of Jalalabad, Kandahar, Herat and Khost Matun. Performance grant allocations for prioritized urban investments will be awarded against achievement of specific performance criteria in three cycles. Four participating PCCs will receive 5 percent of the formula-based allocation investment financing amount following the submittal of a “Municipal Investment Platform” (Cycle-1). The remaining financing for investments will be distributed in two subsequent budgetary cycles awarded based on the level of compliance by the municipality with the public financial management triggers. Total budget =US$ 25 million. Component #4: Market Based Infrastructure and Regulatory Reforms, to be implemented by the Kabul Municipality (KM) for within its own coverage area. The KM will develop and implement several regulatory reforms with the immediate focus on simplification of construction permits. Other reforms relevant to Doing Business (DB) indicators will also be supported. The KM will identify “Priority Project” investments through consultations with businesses. The funding for these investments will be released in three tranches and will be conditional on meeting the regulatory reform triggers for this component. Total budget = US$ 40 million. Component #5: Red Carpet and Program Coordination, to be implemented by the Ministry of Economy (MoEc). The first of its sub-components seeks to move the government from providing “red tape” (bureaucratic/difficult processes) to providing a “red carpet” (an investor friendly way of operating) through the provision of technical and operational assistance to MoEC for supporting national regulatory reforms and feasibility assessment of business service centers in selected cities. Its second sub-component mandates MoEC as responsible for inter- ministerial coordination within GoIRA for overall management and project oversight across the IAs, for all aspects of the EZ-Kar. Total budget = US$ 10 million PROCUREMENT NOTICE This General Procurement Notice (GPN) is being issued by the MoEc (on behalf of all Implementing Agencies) of the EZ-Kar, with regard to all procurement that will be undertaken under the EZ-Kar Project. All goods, works, non-consulting services and consulting services required for the Project and to be financed out of the proceeds of the IDA/ARTF Grant(s) for EZ-Kar shall be procured in accordance with the requirements set forth or referred to in the “World Bank Procurement Regulations for IPF Borrowers” dated July 2016, revised November 2017 (“Procurement Regulations”), and the provisions of the Recipient’s procurement plan for the Project (“Procurement Plan”) dated November 18, 2018 and the same may be updated from time to time in agreement with the World Bank. Specific procurement notices will be announced, as they become available, in the following websites: UN Development Business, dgMarket, NPA website www.ppu.gov.af and in the local Newspapers. These specific procurement notices will also be available in the website for the EZ- Kar that is expected to be set-up shortly, and the websites of the relevant implementation agency: MoEc: www.moec.gov.af; IDLG: www.idlg.gov.af; MOFA: www.mofa.gov.af; and KM: www.km.gov.af At the time of publication of this GPN, the planned and approved major procurement activities for the EZ-Kar include the following: Consultancy Services: 1. Firm: Feasibility Assessment for Business Service Support Centers in Select EZ-Kar Cities – MoEc 2. Firm: Preparation of Communication/ Media Products for the EZ-Kar Visibility and Branding – MoEc 3. Firm: Design, set-up, pilot and training of staff in a Project specific Management Information System (MIS)– MoEc 4. Firm: Development of a National Regulatory Reform Plan 5. Firm: Phased Impact Evaluation (baseline, mid-term, post-project completion) for select sub-components 6. Firm: Independent Monitoring and Approving Agents 7. Firm(s): NGOs to serve as Facilitating Partners (FPs) for EZ-Kar’s Component 2; total 5 packages proposed for 13 cities – IDLG 8. Firm: Developing web-based GRM system – MoFA 9. Firm: Developing and implementing a communication strategy targeting Afghan refugees in Pakistan – MoFA 10. Firm: Managing helpline and manual development for the same – MoFA 11. Firm: Development and training in municipal level construction permit reform plan – IDLG 12. Firm: Identification, selection and screening of Component 3 projects – IDLG 13. Firm: Feasibility and design of Component 3 projects – IDLG 14. Firm: Construction supervision – IDLG 15. _____________________________ Goods: 1. Office furniture: Varying packages by all IAs 2. IT and Office Equipment and Accessories: Varying packages by all IAs 3. Passport production equipment: MoFA 4. Fuel (vehicles and generators): Varying packages by all IAs 5. _________________________ Works: 1. Market based infrastructure for gozar assemblies (GAs) and business gozar assemblies (BGAs) in 12 cities– to be procured by the GAs and BGAs themselves using community based procurement method or by the IDLG if larger subprojects. 2. Priority city investment infrastructure projects in 4 cities – IDLG 3. Priority Kabul-based infrastructure projects – Kabul Municipality 4. _________________________________________ Non-Consulting Services 1. Internet services: Varying packages by all IAs 2. Website-hosting: MoEC 3. Vehicle rentals: Varying packages by all IAs 4. Office space rentals: IDLG PROCUREMENT Afghanistan : Afghanistan: Eshteghal Zaiee - Karmondena (EZ-Kar) Project PLAN General Information Country: Afghanistan Bank’s Approval Date of the Original Procurement Plan: 2019-01-07 2021-03-29 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166127 GPN Date: 2018-12-22 Project Name: Afghanistan: Eshteghal Zaiee - Karmondena (EZ-Kar) Project Loan / Credit No: / , IDA / D4160, TF / A9092 E Executing Agency(ies): Z-K_CCNP- IDLG WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned AF-EZ-K_CCNP- IDLG- Short Term Employment 144509-CW-RFQ / Opportunities, Reforms, and Request for Single Stage - One 2020-04- IDA / D4160 Post Open - National 17,300.00 20,926.72 Signed 2020-01-05 2020-02-08 2020-07-14 Procurement of Extension and Market Enabling Quotations Envelope 08 Painting of Jalalabad Office Infrastructure under IDLG GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Short Term Employment IDLG/DMM/EZ-KAR/GO-RFQ- Opportunities, Reforms, and Request for Single Stage - One 002 / Procurement of / Post Open - National 45,000.00 0.00 Canceled 2019-01-06 2019-03-03 2019-06-01 Market Enabling Quotations Envelope Generator (9 pcs) Infrastructure under IDLG AF-EZ-K_CCNP- IDLG- Short Term Employment 144041-GO-RFQ / Opportunities, Reforms, and Request for Single Stage - One IDA / D4160 Post Open - National 15,833.00 3,622.60 Completed 2019-11-15 2019-12-14 2020-01-29 2020-01-13 2020-02-16 Procurement of Attendance Market Enabling Quotations Envelope Machine for PIU Office Infrastructure under IDLG Short Term Employment AF-EZ-K_CCNP- IDLG- Opportunities, Reforms, and Single Stage - One 144053-GO-RFB / IDA / D4160 Post Request for Bids Open - International 220,000.00 0.00 Canceled 2020-02-16 2020-06-04 2020-02-21 2020-02-16 2020-04-06 2020-07-25 2020-05-06 2020-09-12 2020-06-10 2020-09-08 Market Enabling Envelope Procurement of Generators Infrastructure under IDLG AF-EZ-K_CCNP- IDLG- Short Term Employment 144058-GO-RFB / Opportunities, Reforms, and Single Stage - One IDA / D4160 Post Request for Bids Open - National 71,760.00 52,010.16 Signed 2020-01-01 2020-06-03 2020-01-06 2020-02-05 2020-07-08 2020-03-06 2020-08-16 2020-04-10 2020-09-30 2020-06-09 Procurement of Office Market Enabling Envelope Furniture Infrastructure under IDLG AF-EZ-K_CCNP- IDLG- Short Term Employment 144262-GO-RFB / Opportunities, Reforms, and Single Stage - One IDA / D4160 Post Request for Bids Open - National 101,880.00 93,401.92 Signed 2020-01-15 2020-02-24 2020-01-20 2020-02-24 2020-06-02 2020-03-25 2020-06-10 2020-04-18 2020-07-13 2020-06-27 Procurement of Engineering Market Enabling Envelope Equipment Infrastructure under IDLG AF-EZ-K_CCNP- IDLG- Short Term Employment 144267-GO-RFQ / Opportunities, Reforms, and Request for Single Stage - One IDA / D4160 Post Open - National 13,800.00 2,024.63 Signed 2020-02-15 2020-03-19 2020-05-31 2020-04-18 Procurement of Security Market Enabling Quotations Envelope Equipment Infrastructure under IDLG AF-EZ-K_CCNP- IDLG- Short Term Employment 144037-GO-RFQ / Opportunities, Reforms, and Request for Single Stage - One IDA / D4160 Post Open - National 43,077.00 16,264.28 Signed 2019-11-10 2019-12-14 2020-02-05 2020-02-12 Procurement of Office Market Enabling Quotations Envelope Furniture Infrastructure under IDLG AF-EZ-K_CCNP- IDLG- Short Term Employment 144000-GO-RFQ / Opportunities, Reforms, and Request for Single Stage - One IDA / D4160 Post Open - National 48,596.00 48,005.13 Signed 2019-11-09 2019-12-13 2020-01-13 2020-02-11 Procurement of IT Equipment Market Enabling Quotations Envelope for PIU and PMUs Infrastructure under IDLG AF-EZ-K_CCNP- IDLG- Short Term Employment 144264-GO-RFQ / Opportunities, Reforms, and Request for Single Stage - One IDA / D4160 Post Open - National 14,820.00 12,173.27 Signed 2020-02-01 2020-02-28 2020-03-15 2020-03-29 Procurement of Office Market Enabling Quotations Envelope Equipment Infrastructure under IDLG Short Term Employment AF-EZ-K_CCNP- IDLG- Opportunities, Reforms, and Single Stage - One 144241-GO-RFB / IDA / D4160 Post Request for Bids Open - International 592,020.00 559,671.00 Signed 2020-01-05 2020-05-30 2020-01-10 2020-02-27 2020-02-24 2020-07-18 2020-03-25 2020-09-16 2020-04-29 2021-01-16 2020-10-26 Market Enabling Envelope Procurement of IT Equipment Infrastructure under IDLG AF-EZ-K_CCNP- IDLG- Short Term Employment 200872-GO-RFB / Opportunities, Reforms, and Single Stage - One TF / A9092 Post Request for Bids Open - National 178,000.00 202,070.17 Signed 2020-10-30 2020-11-15 2020-11-04 2020-12-09 2020-12-16 2021-01-08 2021-01-02 2021-02-01 2021-03-03 2021-04-02 Procurement of Generators for Market Enabling Envelope PIU and PMUs Infrastructure under IDLG AF-EZ-K_CCNP- IDLG- Short Term Employment Pending 225175-GO-RFB / Opportunities, Reforms, and Single Stage - One IDA / D4160 Post Request for Bids Open - National 118,740.00 0.00 Implementati 2021-05-08 2021-05-13 2021-06-12 2021-07-03 2021-07-27 2021-09-07 Procurement of Engineering Market Enabling Envelope on Equipment Infrastructure under IDLG AF-EZ-K_CCNP- IDLG- Short Term Employment Pending 225180-GO-RFQ / Opportunities, Reforms, and Request for Single Stage - One IDA / D4160 Post Open - National 31,890.00 0.00 Implementati 2021-06-04 2021-06-26 2021-07-26 Procurement of Security Market Enabling Quotations Envelope on Equipment Infrastructure under IDLG Short Term Employment AF-EZ-K_CCNP- IDLG- Pending Opportunities, Reforms, and Single Stage - One 225163-GO-RFB / IDA / D4160 Post Request for Bids Open - National 86,894.00 0.00 Implementati 2021-04-01 2021-04-06 2021-05-06 2021-05-27 2021-06-20 2021-08-01 Market Enabling Envelope Procurement of IT Equipment on Infrastructure under IDLG AF-EZ-K_CCNP- IDLG- Short Term Employment Pending 225169-GO-RFB / Opportunities, Reforms, and Single Stage - One IDA / D4160 Post Request for Bids Open - National 59,545.00 0.00 Implementati 2021-05-12 2021-05-17 2021-06-16 2021-07-07 2021-07-31 2021-09-11 Procurement of Office Market Enabling Envelope on Equipment Infrastructure under IDLG AF-EZ-K_CCNP- IDLG- Short Term Employment Pending 225166-GO-RFQ / Opportunities, Reforms, and Request for Single Stage - One IDA / D4160 Post Open - National 10,610.00 0.00 Implementati 2021-04-08 2021-04-29 2021-05-29 Procurement of Office Market Enabling Quotations Envelope on Furniture Infrastructure under IDLG Page 1 NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Short Term Employment IDLG/DMM/EZ-KAR/NC-RFQ- Opportunities, Reforms, and Request for Single Stage - One 002 / Procurement of Printing / Post Open - National 40,000.00 0.00 Canceled 2019-01-06 2019-03-03 2019-06-01 Market Enabling Quotations Envelope and publication Infrastructure under IDLG Short Term Employment IDLG/DMM/EZ-KAR/NC-RFQ- Opportunities, Reforms, and Request for Single Stage - One 003 / Procurement of web / Post Open - National 5,000.00 0.00 Canceled 2019-01-06 2019-03-03 2019-06-01 Market Enabling Quotations Envelope hosting Infrastructure under IDLG IDLG/EZ-KAR/NCS-RFB-06 / Short Term Employment Hiring Facilitating Partner-EZ- Opportunities, Reforms, and Single Stage - One IDA / D4160 Post Request for Bids Open - International 1,149,608.00 860,832.16 Signed 2020-03-15 2020-05-07 2020-03-20 2020-05-07 2020-05-01 2020-06-17 2020-05-31 2020-09-01 2020-07-05 2021-03-25 2023-07-05 KAR, Package # 6 (Pul-E- Market Enabling Envelope Khumri) Infrastructure under IDLG AF-EZ-K_CCNP- IDLG- 214785-NC-RFB / Short Term Employment Procurement of Hiring Opportunities, Reforms, and Single Stage - One IDA / D4160 Post Request for Bids Open - International 1,311,135.00 0.00 Canceled 2021-02-10 2021-02-13 2021-02-15 2021-03-02 2021-03-29 2021-04-28 2021-06-02 2024-01-18 Facilitating Partner -EZ-KAR, Market Enabling Envelope Package # 3 (Herat, Infrastructure under IDLG Cheghcharan) AF-EZ-K_CCNP- IDLG- 225338-NC-DIR / Short Term Employment Under Procurement of Mobile Money Opportunities, Reforms, and IDA / D4160 Post Direct Selection Direct 60,000.00 0.00 Implementati 2021-03-28 2021-03-28 2021-04-02 2021-04-22 2022-04-22 Operators for EZ-Kar Market Enabling on emergency relief grants for Infrastructure under IDLG local businesses AF-EZ-K_CCNP- IDLG- 225339-NC-DIR / Short Term Employment Under Procurement of Mobile Money Opportunities, Reforms, and IDA / D4160 Post Direct Selection Direct 60,000.00 0.00 Implementati 2021-03-28 2021-03-28 2021-04-02 2021-04-22 2022-04-22 Operators for EZ-Kar Market Enabling on emergency relief grants for Infrastructure under IDLG local businesses AF-EZ-K_CCNP- IDLG- 225340-NC-DIR / Short Term Employment Under Procurement of Mobile Money Opportunities, Reforms, and IDA / D4160 Post Direct Selection Direct 60,000.00 0.00 Implementati 2021-03-28 2021-03-28 2021-04-02 2021-04-22 2022-04-22 Operators for EZ-Kar Market Enabling on emergency relief grants for Infrastructure under IDLG local businesses AF-EZ-K_CCNP- IDLG- 225341-NC-DIR / Short Term Employment Under Procurement of Mobile Money Opportunities, Reforms, and IDA / D4160 Post Direct Selection Direct 60,000.00 0.00 Implementati 2021-03-28 2021-03-28 2021-04-02 2021-04-22 2022-04-22 Operators for EZ-Kar Market Enabling on emergency relief grants for Infrastructure under IDLG local businesses CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IDLG/DMM/EZ-KAR/CS-FBS- Short Term Employment 004 / Hiring Facilitating Opportunities, Reforms, and Fixed Budget / Prior Open - International 1,017,741.00 0.00 Canceled 2019-01-01 2019-01-22 2019-03-07 2019-04-04 2019-05-04 2019-06-08 2019-07-13 2022-07-12 Partner-EZ-Kar FP Package-4 Market Enabling Selection (Khost) Infrastructure under IDLG IDLG/DMM/EZ-KAR/CS-FBS- Short Term Employment 005 / Hiring Facilitating Opportunities, Reforms, and Fixed Budget / Prior Open - International 1,022,385.00 0.00 Canceled 2019-01-01 2019-01-22 2019-03-07 2019-04-04 2019-05-04 2019-06-08 2019-07-13 2022-07-12 Partner-EZ-Kar FP Package-5 Market Enabling Selection (Kandahar) Infrastructure under IDLG IDLG/DMM/EZ-KAR/CS-FBS- Short Term Employment 006 / Hiring Facilitating Opportunities, Reforms, and Fixed Budget / Prior Open - International 1,017,741.00 0.00 Canceled 2019-01-01 2019-01-22 2019-03-07 2019-04-04 2019-05-04 2019-06-08 2019-07-13 2022-07-12 Partner-EZ-Kar FP Package-6 Market Enabling Selection (Faryab) Infrastructure under IDLG Short Term Employment IDLG/EZ-KAR/CS-FBS-01 / Opportunities, Reforms, and Fixed Budget Hiring Facilitating Partner-EZ- IDA / D4160 Prior Open - International 2,479,618.00 2,509,300.73 Signed 2019-02-25 2019-07-22 2019-03-18 2019-02-13 2019-05-01 2019-08-25 2019-05-29 2019-10-09 2019-06-28 2020-02-12 2019-08-02 2020-04-13 2019-09-06 2021-01-04 2020-09-05 Market Enabling Selection KAR, Package # 1 (Jalalabad) Infrastructure under IDLG IDLG/EZ-KAR/CS-FBS-02 / Short Term Employment Hiring Facilitating Partner-EZ- Opportunities, Reforms, and Fixed Budget IDA / D4160 Prior Open - International 1,297,054.00 1,360,714.03 Signed 2019-02-25 2019-08-10 2019-03-18 2019-02-13 2019-05-01 2019-09-11 2019-05-29 2019-10-26 2019-06-28 2020-01-26 2019-08-02 2020-03-29 2019-09-06 2021-01-04 2020-09-05 KAR, Package # 2 (Mehtarlam, Market Enabling Selection Assadabad, Parun) Infrastructure under IDLG Short Term Employment IDLG/EZ-KAR/CS-FBS-04 / Opportunities, Reforms, and Fixed Budget Hiring Facilitating Partner-EZ- IDA / D4160 Prior Open - International 1,016,607.00 1,056,811.21 Signed 2019-02-25 2019-07-22 2019-03-18 2019-02-13 2019-05-01 2019-11-01 2019-05-29 2019-12-31 2019-06-28 2020-02-10 2019-08-02 2020-05-09 2019-09-06 2020-10-28 2020-09-05 Market Enabling Selection KAR, Package # 4 (Taluqan) Infrastructure under IDLG Short Term Employment IDLG/EZ-KAR/CS-FBS-05 / Opportunities, Reforms, and Fixed Budget Hiring Facilitating Partner-EZ- IDA / D4160 Prior Open - International 1,016,607.00 1,033,243.23 Signed 2019-02-25 2019-07-22 2019-03-18 2019-02-13 2019-05-01 2019-11-01 2019-05-29 2020-01-04 2019-06-28 2020-02-18 2019-08-02 2020-04-02 2019-09-06 2020-10-28 2020-09-05 Market Enabling Selection KAR, Package # 5 (Kunduz) Infrastructure under IDLG Short Term Employment IDLG/EZ-KAR/CS-FBS-07 / Opportunities, Reforms, and Fixed Budget Hiring Facilitating Partner-EZ- IDA / D4160 Prior Open - International 1,021,015.00 1,061,453.27 Signed 2019-02-25 2019-07-29 2019-03-18 2019-02-13 2019-05-01 2019-09-11 2019-05-29 2019-10-30 2019-06-28 2020-01-28 2019-08-02 2020-04-02 2019-09-06 2021-01-04 2020-09-05 Market Enabling Selection KAR, Package # 7 (Khost) Infrastructure under IDLG Short Term Employment IDLG/EZ-KAR/CS-FBS-08 / Opportunities, Reforms, and Fixed Budget Hiring Facilitating Partner-EZ- IDA / D4160 Prior Open - International 1,057,160.00 1,102,013.15 Signed 2019-02-25 2019-07-22 2019-03-18 2019-02-13 2019-05-01 2019-09-11 2019-05-29 2019-10-21 2019-06-28 2020-02-11 2019-08-02 2020-04-02 2019-09-06 2021-01-04 2020-09-05 Market Enabling Selection KAR, Package # 8 (Kandahar) Infrastructure under IDLG Page 2 Short Term Employment IDLG/EZ-KAR/CS-FBS-09 / Opportunities, Reforms, and Fixed Budget Hiring Facilitating Partner-EZ- IDA / D4160 Prior Open - International 1,021,015.00 1,036,670.40 Signed 2019-02-25 2019-07-29 2019-03-18 2019-02-13 2019-05-01 2019-09-11 2019-05-29 2019-11-03 2019-06-28 2020-02-10 2019-08-02 2020-04-16 2019-09-06 2021-01-04 2020-09-05 Market Enabling Selection KAR, Package # 9 (Maimana) Infrastructure under IDLG Short Term Employment IDLG/EZ-KAR/CS-CQS-01 / Consultant Opportunities, Reforms, and Baseline economic assessment IDA / D4160 Post Qualification Open - International 300,000.00 0.00 Canceled 2019-02-25 2019-03-18 2019-05-01 2019-05-31 2019-07-05 2020-01-01 Market Enabling of 11 cities Selection Infrastructure under IDLG AF-EZ-K_CCNP- IDLG- Short Term Employment 144481-CS-QCBS / Hiring of Opportunities, Reforms, and Quality And Cost- Consultancy Firm for Baseline IDA / D4160 Post Open - International 484,155.00 0.00 Canceled 2019-11-10 2019-12-02 2019-12-01 2020-01-14 2020-01-14 2020-02-11 2020-03-12 2020-04-16 2020-05-21 2020-11-17 Market Enabling Based Selection Assessment of Buisness Gozar Infrastructure under IDLG Establishment IDLG/EZ-KAR/CS-FBS-03 / Short Term Employment Hiring Facilitating Partner-EZ- Opportunities, Reforms, and Fixed Budget IDA / D4160 Prior Open - International 1,356,867.00 0.00 Canceled 2019-02-25 2019-07-22 2019-03-18 2019-02-13 2019-05-01 2019-09-11 2019-05-29 2019-10-28 2019-06-28 2020-01-20 2019-08-02 2020-03-29 2019-09-06 2020-09-05 KAR,Package # 3 (Herat, Market Enabling Selection Chegharan) Infrastructure under IDLG AF-EZ-K_CCNP- IDLG- Short Term Employment 169569-CS-CQS / Hiring Consultant Opportunities, Reforms, and Consultancy Firm for Baseline IDA / D4160 Post Qualification Open - International 427,305.00 0.00 Canceled 2020-04-28 2020-04-21 2020-05-19 2020-07-02 2020-08-01 2020-09-05 2021-03-04 Market Enabling Assessment of Business Gozar Selection Infrastructure under IDLG Establishment IDLG/EZ-KAR/CS-FBS-06 / Short Term Employment Hiring Facilitating Partner-EZ- Opportunities, Reforms, and Fixed Budget IDA / D4160 Prior Open - International 1,116,866.00 0.00 Canceled 2019-02-25 2019-07-22 2019-03-18 2019-02-13 2019-05-01 2019-11-01 2019-05-29 2020-01-07 2019-06-28 2019-08-02 2019-09-06 2020-09-05 KAR, Package # 6 (Puli- Market Enabling Selection Khumri) Infrastructure under IDLG INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Short Term Employment AF-EZ-K_CCNP- IDLG- Individual Opportunities, Reforms, and 126335-CS-INDV / Hiring of IDA / D4160 Post Consultant Open 176,000.00 174,180.00 Signed 2020-05-02 2019-10-15 2020-06-04 2020-02-05 2020-06-05 2020-02-19 2020-07-10 2020-05-03 2021-07-05 Market Enabling International Economic Expert Selection Infrastructure under IDLG AF-EZ-K_CCNP- IDLG- Short Term Employment 135596-CS-CDS / Hiring of Opportunities, Reforms, and IDA / D4160 Post Direct Selection Direct 60,000.00 59,976.00 Signed 2019-10-20 2019-11-05 2019-10-30 2019-11-13 2019-12-03 2019-11-14 2020-11-27 Senior Policy & Planning Market Enabling Advisor Infrastructure under IDLG Short Term Employment AF-EZ-K_CCNP- IDLG- Opportunities, Reforms, and 135594-CS-CDS / Hiring of IDA / D4160 Post Direct Selection Direct 64,000.00 0.00 Canceled 2019-10-20 2019-11-05 2019-10-30 2019-12-03 2020-11-27 Market Enabling Strategic Planning Advisor Infrastructure under IDLG AF-EZ-K_CCNP- IDLG- Short Term Employment 208239-CS-CDS / Hiring of Opportunities, Reforms, and IDA / D4160 Post Direct Selection Direct 59,976.00 59,658.32 Signed 2020-12-07 2021-02-11 2020-12-17 2021-02-16 2021-02-07 2021-02-28 2022-02-07 Senior Policy & Planning Market Enabling Advisor Infrastructure under IDLG Page 3