Page 1 1 2 2 3 4 6 7 8 9 10 11 Ref. No. Description Type Contract No. No. of packages Proc. Method Review by Bank Prior/Post Preperation BD/RFP date Expected Bid- Open. Date/Proposal Submission Date Conctract signed date Contract completion date WORKS (INCLUDING SUPPLY & INSTALLATION) NAAT LER (TEMN VE MONTAJ DAHL) 1 Construction of Sanitary Landfill and Transfer Station and Closing of the Existing Landfill Kat Atk Düzenli Depolama Tesisi, Aktarma stasyonu naat ve Mevcut Tesisin Kapatlmas Works BER-W1 1 NCB POST July 2007 September 2007 May-08 February 2009 Works Sub-Total naat leri Alt-Toplam GOODS MAL VE EKPMAN ALIMI 1 Procurement of Equipment, Software,Hardware, vehicle and construction equipment for Operational Services Kurumsal Yaplanma kapsamnda ekipman, yazlm, donanm, araç ve i makinesi alm Goods BER-G1 multiple Shopping POST Aprl 2008 December 2008 Goods Sub-Total Mal Alm Alt-Toplam CONSULTANT'S SERVICES AND TRAINING DANIMANLIK HZMETLER VE ETM 1 Preparation of EIA ÇED Hazrlanmas C BER-C1 1 SSS PRIOR June 2007 May-08 2 Review and Revision of the Final Designs, Preparation of the Bidding Documents and Construction Supervision Mevcut Projenin ncelenmesi ve Revizyonu, hale Dokümanlarnn Hazrlanmas ve naat Kontrollu C BER-C2 1 QCBS POST October 2006 November 2006 February 2007 Aprl 2009 3 Institutional Strengthening Kurumsal Güçlenme C BER-C3 multiple CQ POST January 2007 December 2008 4 Consultancy Services for Project Implementation Management Proje Uygulama Yönetimi Müavirlik Hizmetleri C BER-C4 multiple Individual POST January 2007 December 2008 5 Training Eitim C BER-C5 multiple Other POST June 2007 December 2008 Consultant Sub-Total Müavirlik Alt-Toplam TOTAL TOPLAM a) All ICB contracts for works and goods and first two NCB works, and goods contracts, first two Shopping Contracts and all direct contracting will be subject to prior review by the Bank. b) Bank’s sample NCB documents for ECA Region for Works will be used. The conditions for using NCB are listed in Schedule 4 to the Loan Agreement. c) Consultancy services by firms estimated to cost Euro 200,000 or more per contract, individual consultant contracts estimated to cost Euro 50,000 or more and single source selection of consultants will be subject to prior review by the Bank. d) Short lists composed entirely of national consultants: Short lists of consultants for services estimated to cost less than Euro 200,000 equivalent per contract may be composed entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. The works contracts to cost less than Euro 7,5 million each may be awarded through NCB. MUNICIPAL SERVICES PROJECT - BERGAMA PROCUREMENT PLAN (Fourth Revision / Aprl 04, 2008)