Procurement 1. Procurement for the Project will be carried out in accordance with the World Bank’s "Guidelines: Procurement of Goods, Works and Non-consulting Services Under IBRD Loans and IDA Credits and Grants" dated January 2011 and revised as of July, 2014 (Procurement Guidelines); and "Guidelines: Selection and Employment of Consultants Under IBRD Loans and IDA Credits and Grants by World Bank Borrowers" dated January 2011 and revised as of July 2014 (Consultant Guidelines) and the provisions stipulated in the Legal Agreement (LA) and POM. The World Bank Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by IBRD Loans and IDA Credit and Grants dated October 15, 2006 and revised on January 2011, would also apply. Thresholds for Procurement Methods 2. Goods: Goods and equipment estimated to cost US$1,000,000 or more would be procured through International Competitive Bidding (ICB). Goods estimated to cost less than US$1,000,000 and more than US$100,000 would be procured through National Competitive Bidding (NCB). Readily available off-the- shelf goods estimated to cost equal to or less than US$100,000 each would be procured through Shopping (SH) on the basis of at least three written quotations obtained from qualified suppliers. Direct Contracting (DC) may be used in accordance with the requirements outlined in para. 3.7 of the Procurement Guidelines. 3. Works: Works estimated to cost equal to US$5,000,000 or more would be procured through ICB. Works estimated to cost less than US$5,000,000 and equal to or more than US$200,000 would be procured through NCB. Contracts estimated to cost less than US$200,000 each would be procured through Shopping (SH) procedures on the basis of at least three written quotations obtained from qualified contractors. Direct Contracting (DC) for works may be used in accordance with the requirements outlined in para. 3.7 of the Procurement Guidelines. 4. Consultant Services: Consultancy services to be provided by consulting firms estimated to cost more than US$300,000 would be procured through Quality and Cost Based Selection (QCBS) method. Consultancy services to be provided by consulting firms estimated to cost equal to or less than US$300,000 may be procured through Consultants’ Qualifications Selection (CQS) method. Other methods such as Fixed Budget Selection (FBS), Quality Based Selection (QBS), and Least Cost Selection (LCS) shall be made available through the Legal Agreement irrespective of the amount. Individual Consultants (IC) will be selected in accordance with Section V of the Consultant Guidelines. Single Source Selection (SSS) method for firms and individuals will also be specified in the Legal Agreement. For assignments estimated to cost equal to or less than US$300,000, the shortlist may comprise only of national firms according to the paragraph 2.7 of the Consultant Guidelines. However, if foreign firms express interest, they shall be considered. 5. NCB of the Borrower may be used for procurement of goods, works and non-consulting services for the project, provided that the following provisions are complied with: (a) Entities in which the Republic of Armenia owns a majority shareholding shall not be invited to participate in tenders for the government unless they are and can be shown to be legally and financially autonomous and operate under commercial law. (b) Post-qualification criteria shall only pertain to past contract performance, financial, managerial, and technical capabilities of bidders. (c) Joint venture partners shall be jointly and severally liable for their obligations. (d) Estimated contract prices shall not be advertised. (e) Except for late bids, no bids shall be rejected at the bid opening. The opening procedures shall comply with conditions of paragraph 2.45 of the Procurement Guidelines. (f) No bids shall be rejected solely because they exceed the estimated price. Bids can be cancelled and new bids invited, only if the conditions of paragraphs 2.61–2.64 of the Procurement Guidelines are met. (g) All bid evaluation criteria shall be quantifiable in monetary terms or expressed as pass/fail criteria. (h) Without limitation to paragraph 3 of Appendix 1 to the Procurement Guidelines, advance Bank approval is required for any modifications in the contract scope/conditions during implementation. Prior Review Thresholds Type of Procurement Prior Review Threshold Goods $1,000,000 Works First ICB regardless of value and contracts equal to or above $10,000,000 and first NCB IT System & Non-Consulting $1,000,000 Services Direct Contracting* $60,000 Consulting Services (Firm) First QCBS regardless of value and contracts equal to or above $500,000 and first CQS Consulting Services $200,000 (Individual) Single Source Selection** $5,000 *Must comply with the requirements of para. 3.7 of the Procurement Guidelines. ** Must comply with the requirements of paras. 3.8-3.11 of the Consultant Guidelines. 6. All TORs are subject to the Bank’s prior review irrespective of the prior or post review status of the consulting assignment in the procurement plan. Post Review Ratio 7. Contracts not subject to Bank’s prior review will be post reviewed by Bank’s supervision missions. Procurement Plan 8. All contracts to be financed under the project, the various procurement or consultant selection methods, the estimated costs, prior review requirements, and time frame have been agreed between the Borrower and the Bank and presented in the Procurement Plan (see below). The Procurement Plan will be updated as required to reflect the actual Project implementation needs and improvements in institutional capacity. The Procurement Plan its updates or modifications, shall be subject to the Bank’s prior review and no objection before implementation. The final version of the Procurement Plan will be disclosed (without cost estimates) and posted in the Bank’s external website in accordance with paragraph 1.18 of Procurement Guidelines and paragraph 1.25 of the Consultants Guidelines, ATDF’s database, and www.procurement.am. 32. Works contracts to be procured under the project include rehabilitation of heritage hubs, construction of tourism facilities and improvement of access roads and parking areas. There is no prequalification anticipated under the project and works are to be procured using NCB procedure. 33. Consultants to be selected under the project include services for preliminary assessment of buildings to undergo rehabilitation, preparation of detailed designs for the rehabilitation of heritage hubs and author’s supervision, technical supervision of works, destination management, marketing and promotion, audit services, monitoring and evaluation, training and site management plan. UNESCO will be contracted under Single Source Selection for advisory services for cultural heritage. 34. Goods to be procured under the project include vehicles, furniture, and equipment for the rehabilitated sites and tourism facilities. 35. A General Procurement Notice (GPN) will be published in UNDB on-line and in its printed version after negotiations. Specific Procurement Notices (SPN) for all ICB packages and consulting contracts each with cost estimate above US$300,000 will also be published in the UNDB. In addition, the SPNs for civil works contracts will be provided to the Union of Builders of Armenia. Filing and Record Keeping 36. ATDF will keep complete files of all procurement packages under the project to facilitate post review and Project audit. 37. The procurement related risks are summarized in Table 3.1 below. 38. Procurement Plan Table 3.1: Summary Risk Assessment Rating of Rating of Description of Risk Mitigation Measures Residual Risk Risk Current procurement staff Substantial ATDF will hire additional qualified Moderate is not able to cope with the procurement staff or procurement increased workload under consultant. LEIDP. High turnover of High ATDF will hire additional qualified Substantial procurement staff due to procurement staff or procurement low salary. consultant. Newly procurement staff Substantial ATDF’s procurement staff should Moderate may not have sufficient continuously improve their knowledge and experience knowledge of Bank’s procurement in Bank procurement. procedures by attending training/workshops offered by the World Bank, familiarizing themselves with the Procurement and Consultant Guidelines and on- the-job training. Given the multi- Substantial (a) Educate stakeholders about the Moderate stakeholder environment, POM through ATDF’s possibility of unnecessary Institutional Support intervention and pressures Department. (b) Ensure resulting in transparent decision making implementation delays based on evaluation criteria disclosed in bidding documents and proposal documents. Inadequate capacity in the Substantial (a) DFA will apply additional efforts Moderate DFA to prepare TORs and to improve the technical parts technical specifications of procurement documents and and implement Bank- quality of TORs for consulting financed Project. services. (b) Project to finance consulting services to build capacity in the DFA. PROCUREMENT Armenia : Local Economy and Infrastructure Development Project PLAN General Information Country: Armenia Bank’s Approval Date of the Original Procurement Plan: 2017-03-23 2020-11-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P150327 GPN Date: Project Name: Local Economy and Infrastructure Development Project Loan / Credit No: TF / A1063, IBRD / 85720 Armenian Territorial Development Fund Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned TUR-01-1 / Rehabilitation of Heritage Hub and Tourism Single Stage - One 2019-05- road leading to Garni Stone IBRD / 85720 Post Request for Bids Open - National 1,200,000.00 0.00 Canceled 2017-10-11 2017-10-16 2017-11-03 2017-11-13 2017-12-01 2017-12-13 2017-12-29 2018-01-10 Circuit Development Envelope 05 Symphony TUR-01-01-1 / Heritage Hub and Tourism Single Stage - One 1,510,848.6 2019-09- Rehabilitation of road leading IBRD / 85720 Post Request for Bids Open - National 1,427,000.00 Signed 2018-02-22 2018-03-05 2018-02-27 2018-03-19 2018-03-27 2018-04-16 2018-04-26 2018-05-07 2018-06-07 2018-06-19 Circuit Development Envelope 0 30 to Garni Stone Symphony TUR-06 / Rehabilitation of Heritage Hub and Tourism Single Stage - One 1,901,802.7 2019-04- Road Segment Leading to IBRD / 85720 Post Request for Bids Open - National 2,029,309.00 Completed 2018-05-11 2018-05-20 2018-05-16 2018-05-24 2018-06-13 2018-06-21 2018-07-13 2018-07-11 2018-08-24 2018-07-27 Circuit Development Envelope 6 21 Tatev Monastery TUR-07 / Streets Rehabilitation of Kumayri Heritage Hub and Tourism Single Stage - One 2,108,291.7 2019-03- IBRD / 85720 Post Request for Bids Open - National 2,146,640.88 Signed 2018-07-16 2018-07-12 2018-07-19 2018-07-12 2018-08-16 2018-08-09 2018-09-15 2018-08-24 2018-10-27 2018-09-04 Historical Center in Gyumri Circuit Development Envelope 8 26 (consist of 2 Lots) TUR-08 / Reconstruction of Heritage Hub and Tourism Single Stage - One 2019-07- the Road Leading to "Sochut" IBRD / 85720 Post Request for Bids Open - National 495,000.00 412,795.18 Completed 2018-11-05 2018-11-05 2018-11-10 2018-11-08 2018-12-08 2018-12-06 2019-01-07 2018-12-12 2019-02-18 2018-12-27 Circuit Development Envelope 18 Dendropark TUR-02-01 / Improvement of Heritage Hub and Tourism Single Stage - One 2020-05- IBRD / 85720 Post Request for Bids Open - National 224,000.00 193,024.76 Signed 2019-07-26 2019-07-25 2019-07-29 2019-08-02 2019-08-26 2019-08-23 2019-09-25 2019-09-06 2019-11-06 2019-09-20 Khor Virap Monastery Area Circuit Development Envelope 04 TUR-PPI-01 / Provision of Utility Infrastructure for Areni Wine Hotel: Lot 1 Gas Supply System for Areni Wine Hotel; Heritage Hub and Tourism Single Stage - One 1,166,699.3 2021-03- Lot 2 Water supply and IBRD / 85720 Post Request for Bids Open - National 1,337,000.00 Signed 2019-12-10 2019-12-10 2019-12-15 2019-12-11 2020-01-19 2020-01-14 2020-02-18 2020-02-14 2020-03-31 2020-04-06 Circuit Development Envelope 4 26 sewage system of Areni Wine Hotel ; Lot 3 Electricity and internet Supply System for Areni Wine Hotel. TUR-03 / Goris Hub Regeneration Lot 1: Restoration of the right bank of Vararakn River, Lot 2: Restoration of the Heritage Hub and Tourism Single Stage - One 1,851,790.8 2021-07- historical-cultural IBRD / 85720 Post Request for Bids Open - National 4,714,000.00 Signed 2019-12-15 2019-12-17 2019-12-20 2019-12-17 2020-01-24 2020-01-21 2020-02-23 2020-02-14 2020-04-05 2020-04-07 Circuit Development Envelope 9 29 environment of the central part of Goris town, Lot 3: Renovation of historical residential houses in the central part of Goris TUR-04-1 / Partial restoration and reinforcement Heritage Hub and Tourism Single Stage - One 2020-11- of monuments in the IBRD / 85720 Post Request for Bids Open - National 309,000.00 0.00 Canceled 2020-02-12 2020-02-12 2020-02-17 2020-02-15 2020-03-16 2020-03-13 2020-04-15 2020-05-27 Circuit Development Envelope 23 historical capital of Armenia Dvin TUR-03-2 / Restoration of the historical-cultural Heritage Hub and Tourism Single Stage - One 2021-09- IBRD / 85720 Post Request for Bids Open - National 2,390,000.00 0.00 Canceled 2020-02-21 2020-02-25 2020-02-26 2020-02-27 2020-03-25 2020-03-25 2020-04-24 2020-05-12 2020-06-05 environment of the central Circuit Development Envelope 28 part of Goris town TUR-04-1-2 / Partial restoration and reinforcement Heritage Hub and Tourism Single Stage - One 2021-01- of monuments in the IBRD / 85720 Post Request for Bids Open - National 309,000.00 0.00 Canceled 2020-03-30 2020-03-30 2020-04-04 2020-05-02 2020-04-27 2020-06-01 2020-04-27 2020-07-13 Circuit Development Envelope 09 historical capital of Armenia Dvin TUR-04-1-3 / Partial restoration and reinforcement Heritage Hub and Tourism Single Stage - One 2021-03- of monuments in the IBRD / 85720 Post Request for Bids Open - National 305,000.00 0.00 Canceled 2020-05-22 2020-05-21 2020-05-27 2020-06-24 2020-06-18 2020-07-24 2020-06-22 2020-09-04 Circuit Development Envelope 03 historical capital of Armenia Dvin TUR-04-1-4 / Partial restoration and reinforcement Under Heritage Hub and Tourism Single Stage - One 2021-05- of monuments in the IBRD / 85720 Post Request for Bids Open - National 305,000.00 246,937.42 Implementat 2020-07-10 2020-07-21 2020-07-15 2020-07-22 2020-08-12 2020-08-19 2020-09-11 2020-09-07 2020-10-23 Circuit Development Envelope 21 historical capital of Armenia ion Dvin ТUR-12 / Reconstruction of Heritage Hub and Tourism Single Stage - One 3,908,167.8 2022-04- IBRD / 85720 Post Request for Bids Open - National 5,108,000.00 Signed 2020-07-06 2020-07-06 2020-07-08 2020-07-09 2020-08-12 2020-08-10 2020-09-10 2020-08-21 2020-10-22 2020-11-06 Yerevan-Lanjazat-Garni road Circuit Development Envelope 3 15 TUR-09 / Rehabilitation of Under Heritage Hub and Tourism Single Stage - One 2022-02- the road leading to old IBRD / 85720 Post Request for Bids Open - National 1,056,000.00 0.00 Implementat 2020-11-04 2020-11-03 2020-11-09 2020-11-03 2020-12-07 2021-01-06 2021-02-17 Circuit Development Envelope 12 Khndzoresk ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PLEID C- 2.2 / Rehabilitation of Goris Central Parks ; redevelopment of the Right Bank of Goris River; Consultant restoration of Historical and Heritage Hub and Tourism TF / A1063 Prior Qualification Open - International 0.00 142,629.48 Signed 2016-10-21 2016-10-14 Architectural Environment of Circuit Development Selection the Central Part of Goris and development a Management Model for upgraded infrastructures LPD-01 / Development of Project Design and Author's Consultant Supervision for the Heritage Hub and Tourism IBRD / 85720 Post Qualification Open - National 50,000.00 44,049.21 Completed 2017-11-22 2017-12-06 2017-12-06 2017-12-08 2018-01-10 2017-12-28 2018-01-17 2018-01-13 2018-02-07 2018-01-12 2019-06-22 2019-08-04 Rehabilitation of Road Circuit Development Selection Segment Leading to Tatev Monastery Sub-project LV-01 / Detailed Consultant Heritage Hub and Tourism Measurement, Assets IBRD / 85720 Post Qualification Open - National 800.00 686.43 Completed 2018-01-09 2018-01-09 2018-01-19 2018-01-17 2018-02-16 2018-02-16 2018-02-23 2018-02-20 2018-03-16 2018-02-23 2018-05-15 2018-04-06 Circuit Development Inventory and Valuation Selection LTS-01 / Technical supervision of construction Consultant Heritage Hub and Tourism for Rehabilitation of road IBRD / 85720 Post Qualification Open - National 18,560.00 18,385.06 Signed 2018-04-13 2018-04-09 2018-04-27 2018-04-09 2018-05-25 2018-05-04 2018-06-15 2018-05-18 2018-07-06 2018-05-18 2019-10-29 Circuit Development leading to Garni Stone Selection Symphony LTS-02 / Technical supervision of construction Consultant Heritage Hub and Tourism for Rehabilitation of Road IBRD / 85720 Post Qualification Open - National 24,360.00 24,136.16 Completed 2018-05-17 2018-05-23 2018-05-24 2018-05-30 2018-06-21 2018-06-19 2018-07-12 2018-07-06 2018-08-02 2018-07-06 2019-03-30 2019-08-04 Circuit Development Segment Leading to Tatev Selection Monaster LTS-03 / Technical Supervision of construction Consultant Heritage Hub and Tourism for "Streets Rehabilitation of IBRD / 85720 Post Qualification Open - National 23,700.00 23,455.56 Signed 2018-08-02 2018-07-27 2018-08-16 2018-07-27 2018-09-13 2018-08-27 2018-10-04 2018-08-31 2018-10-25 2018-09-03 2019-03-24 Circuit Development Kumayri Historical Center in Selection Gyumri LTS-04 / Technical Supervision for Consultant Heritage Hub and Tourism "Reconstruction of the Road IBRD / 85720 Post Qualification Open - National 7,800.00 7,745.90 Completed 2018-11-21 2018-11-29 2018-11-28 2018-12-20 2018-12-24 2019-01-25 2019-01-14 2019-02-04 2019-02-04 2019-02-07 2019-07-04 2019-09-16 Circuit Development Leading to "Sochut" Selection Dendropark" AUD-18 / AUDIT OF THE LOCAL ECONOMY AND INFRASTRUCTURE Consultant Heritage Hub and Tourism DEVELOPMENT PROJECT (LEID) IBRD / 85720 Post Qualification Open - National 6,443.00 24,124.85 Completed 2018-12-04 2018-11-30 2018-12-11 2019-01-06 2018-12-24 2019-01-27 2018-12-28 2019-02-17 2018-12-28 2019-08-16 2019-06-27 Circuit Development FOR THE PERIOD FROM Selection DECEMBER 29, 2016 TO DECEMBER 31, 2018 LPD-06 / Design and Author's Supervision for the Consultant Heritage Hub and Tourism Utility Infrastructure of "Areni IBRD / 85720 Post Qualification Open - National 28,070.00 0.00 Signed 2019-03-27 2019-03-21 2019-04-10 2019-04-04 2019-05-15 2019-04-29 2019-05-22 2019-05-14 2019-06-12 2019-05-14 2019-07-12 Circuit Development Wine hotel" in Areni Selection community LGS-01 / The geological and geophysical surveys of the Consultant Heritage Hub and Tourism road section bypassing the IBRD / 85720 Post Qualification Open - National 20,760.00 22,832.32 Completed 2019-05-14 2019-05-08 2019-05-21 2019-06-14 2019-06-27 2019-07-25 2019-07-27 2019-08-14 2019-08-17 2019-08-14 2019-09-26 2020-02-24 Circuit Development landslide of road leading to Selection Tatev monastery sub-project LTS-05 / Technical Consultant Supervision of construction Heritage Hub and Tourism IBRD / 85720 Post Qualification Open - National 3,680.00 3,677.73 Signed 2019-08-26 2019-08-16 2019-09-02 2019-08-26 2019-09-28 2019-09-18 2019-10-19 2019-09-27 2019-11-09 2019-09-30 2020-05-07 for "Khor Virap Monastery Circuit Development Selection Area Landscaping". LTS-06 / Technical Supervision of Construction Consultant Heritage Hub and Tourism for Provision of Utility IBRD / 85720 Post Qualification Open - National 16,000.00 15,801.97 Signed 2019-12-15 2019-12-16 2019-12-22 2019-12-23 2020-01-17 2020-03-23 2020-02-07 2020-04-10 2020-02-28 2020-04-13 2021-02-22 Circuit Development Infrastructure for “Areni Wine Selection Hotel” LTS-07 / Technical Consultant Heritage Hub and Tourism Supervision of Construction IBRD / 85720 Post Qualification Open - National 48,000.00 41,188.69 Signed 2019-12-15 2019-12-16 2019-12-22 2019-12-23 2020-01-17 2020-02-15 2020-02-07 2020-03-26 2020-02-28 2020-03-31 2021-06-22 Circuit Development for Goris Hub Regeneration Selection LPD-09 / Design for the Consultant Heritage Hub and Tourism “Improvement of Garni IBRD / 85720 Post Qualification Open - National 35,500.00 31,187.16 Signed 2019-12-30 2019-12-30 2020-01-20 2020-01-30 2020-03-04 2020-03-23 2020-04-03 2020-04-10 2020-05-08 2020-04-16 2020-10-05 Circuit Development Temple area” Selection LPD-08 / Design for the Consultant Heritage Hub and Tourism “Rehabilitation of the road IBRD / 85720 Post Qualification Open - National 38,000.00 229,192.15 Signed 2019-12-30 2020-01-30 2020-01-20 2020-02-26 2020-03-11 2020-04-06 2020-04-10 2020-04-20 2020-05-15 2020-04-21 2020-08-15 Circuit Development leading to Old Khndzoresk” Selection LCD-01 / Development of Concept Design for the Heritage Hub and Tourism Quality Based Under Heritage hub regeneration in IBRD / 85720 Post Open - International 114,815.00 0.00 2020-01-20 2020-01-09 2020-02-10 2020-01-23 2020-04-10 2020-04-06 2020-05-08 2020-06-19 2020-06-07 2020-07-28 2020-07-07 2020-07-28 2020-08-11 2020-11-09 Circuit Development Selection Implementation Areni village and adjacent villages Page 2 LTS-08 / Technical supervision of the "Partial Consultant restoration and reinforcement Heritage Hub and Tourism IBRD / 85720 Post Qualification Open - National 3,039.00 3,411.70 Signed 2020-02-13 2020-02-07 2020-02-27 2020-02-26 2020-04-02 2020-04-20 2020-04-23 2020-05-21 2020-05-14 2020-05-27 2020-11-10 of monuments in the Circuit Development Selection historical capital of Armenia Dvin". Consultant LS-02 / International Visitor Heritage Hub and Tourism Under IBRD / 85720 Post Qualification Open - National 246,000.00 0.00 2020-02-14 2020-02-27 2020-03-06 2020-02-27 2020-04-19 2020-05-19 2020-06-09 2021-11-01 Exit Survey on National Level Circuit Development Implementation Selection AUD-19 / "AUDIT OF THE ARMENIAN TERRITORIAL DEVELOPMENT FUND and AUDIT OF THE LOCAL Consultant Heritage Hub and Tourism ECONOMY AND IBRD / 85720 Post Qualification Open - National 30,918.00 23,973.29 Signed 2020-03-13 2020-03-09 2020-03-20 2020-03-18 2020-04-29 2020-04-10 2020-05-20 2020-05-05 2020-06-10 2020-05-06 2020-09-18 Circuit Development INFRASTRUCTURE Selection DEVELOPMENT (LEID) PROJECT FOR THE YEAR ENDED DECEMBER 31, 2019". LPD-13 / Modification of the sub-project design and Consultant Heritage Hub and Tourism author's supervision for the IBRD / 85720 Post Qualification Open - National 46,280.00 45,768.21 Signed 2020-04-27 2020-04-23 2020-05-18 2020-04-27 2020-07-01 2020-05-21 2020-07-31 2020-05-27 2020-09-04 2020-05-27 2021-02-01 Circuit Development ”Renovation of Garni-Lanjazat Selection road”. LTS-09 / Technical Consultant supervision of the Heritage Hub and Tourism IBRD / 85720 Post Qualification Open - National 50,780.00 49,189.36 Signed 2020-07-31 2020-08-05 2020-08-21 2020-08-13 2020-10-04 2020-09-24 2020-11-03 2020-10-09 2020-11-24 2020-10-12 2022-05-18 ”Reconstruction of Garni- Circuit Development Selection Lanjazat road”. LPD-16 / Design and author's supervision of Improvement Consultant Heritage Hub and Tourism Under of the green zone near Khor IBRD / 85720 Post Qualification Open - National 5,300.00 0.00 2020-09-11 2020-10-14 2020-09-25 2020-10-15 2020-11-08 2020-11-13 2020-12-08 2021-01-12 2021-07-18 Circuit Development Implementation Virap Monastery, installation Selection of sales pavilions LM-01 / Consultancy Service for Tourism and Project Consultant Heritage Hub and Tourism Pending Performance Monitoring & IBRD / 85720 Post Qualification Open - National 144,000.00 0.00 2020-11-04 2020-11-25 2021-01-08 2021-02-07 2021-03-14 2022-03-14 Circuit Development Implementation Evaluation in the 9 selected Selection regions of Armenia. LTS-10 / Technical Consultant supervision of the Heritage Hub and Tourism Pending IBRD / 85720 Post Qualification Open - National 12,500.00 0.00 2020-11-30 2020-12-21 2021-02-03 2021-03-05 2021-03-26 2022-03-26 “Rehabilitation of the road Circuit Development Implementation Selection leading to old Khndzoresk” INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LPD-02 / Autors supervision for Construction For Heritage Hub and Tourism Rehabilitation Of Road IBRD / 85720 Post Direct Selection Direct 7,140.00 7,141.45 Signed 2018-04-26 2018-04-23 2018-05-06 2018-04-23 2018-05-30 2018-05-10 2019-09-22 Circuit Development Leading To Garni Stone Symphony LPD-03/1 / Author's Supervision of construction Heritage Hub and Tourism for "Streets Rehabilitation of IBRD / 85720 Post Direct Selection Direct 7,300.00 7,242.39 Signed 2018-08-02 2018-08-02 2018-08-12 2018-08-02 2018-09-05 2018-09-03 2019-02-02 Circuit Development Kumayri Historical Center in Gyumri LPD-04 / Geological research and Design development for the Heritage Hub and Tourism IBRD / 85720 Post Direct Selection Direct 15,456.00 15,489.35 Signed 2018-12-14 2018-12-10 2018-12-22 2018-12-20 2019-01-15 2018-12-26 2019-02-04 Rehabilitation of landslide Circuit Development segment of road leading to Tatev monastery sub-project. LPD-05 / Author's Supervision of "Reconstruction Heritage Hub and Tourism IBRD / 85720 Post Direct Selection Direct 1,980.00 1,986.01 Completed 2019-02-05 2019-01-30 2019-02-15 2019-02-18 2019-03-11 2019-02-18 2019-08-08 2019-09-16 of the Road Leading to Circuit Development "Sochut" Dendropark". LPD-07 / Author’s Supervision of Construction of Heritage Hub and Tourism IBRD / 85720 Post Direct Selection Direct 1,345.00 1,319.48 Signed 2019-09-20 2019-09-16 2019-09-30 2019-09-23 2019-11-09 2019-10-16 2020-05-07 "Khor Virap Monastery Area Circuit Development Landscaping " LS-01 / Monitoring and Supervision of Tourism International Visitor Survey on Individual National Level. Heritage Hub and Tourism IBRD / 85720 Post Consultant Limited 12,600.00 12,533.21 Signed 2019-11-08 2019-11-04 2019-11-15 2019-11-19 2019-12-06 2019-12-06 2020-01-10 2019-12-06 2021-04-04 Baseline Data Assessment of Circuit Development Selection the Armenia Local Economy and Infrastructure Development Project LPD-10 / Author’s Heritage Hub and Tourism Supervision of Construction of IBRD / 85720 Post Direct Selection Direct 18,790.00 18,781.89 Signed 2020-01-20 2020-01-09 2020-02-08 2020-01-21 2020-03-19 2020-02-28 2022-06-27 Circuit Development "Goris hub regeneration". LPD-11 / Author's supervision of the "Partial restoration and reinforcement Heritage Hub and Tourism IBRD / 85720 Post Direct Selection Direct 1,823.00 1,744.37 Signed 2020-02-13 2020-02-07 2020-03-12 2020-02-25 2020-04-21 2020-03-24 2020-10-18 of monuments in the Circuit Development historical capital of Armenia Dvin". LPD-12 / Modification of the subproject design for "Zorats Heritage Hub and Tourism IBRD / 85720 Post Direct Selection Direct 2,235.00 2,165.99 Signed 2020-03-04 2020-03-03 2020-03-14 2020-03-05 2020-05-18 2020-03-24 2020-06-17 Qarer Monument Tourism Circuit Development Zone". Page 3 LIC-01 / International Individual Consultancy Services for Leading Tourism Individual Product Development Heritage Hub and Tourism Under IBRD / 85720 Post Consultant Open 43,435.00 0.00 2020-03-04 2020-03-06 2020-05-08 2020-05-29 2020-07-03 2020-11-30 activities under the World Circuit Development Implementation Selection Bank’s Local Economy and Infrastructure Development Project. LNS-01 / Local Individual Consultancy Services for Individual Tourism Product Development Heritage Hub and Tourism IBRD / 85720 Post Consultant Open 6,245.00 6,163.30 Signed 2020-03-04 2020-03-06 2020-05-08 2020-04-20 2020-05-29 2020-05-06 2020-07-03 2020-05-06 2020-10-31 under the World Bank’s Local Circuit Development Selection Economy and Infrastructure Development Project LPD-14 / Update of the Design and Author’s Heritage Hub and Tourism Supervision of Reconstruction IBRD / 85720 Post Direct Selection Direct 52,165.00 52,060.73 Signed 2020-08-25 2020-08-19 2020-09-04 2020-08-31 2020-11-01 2020-09-08 2021-12-26 Circuit Development of tourism infrastructure and streets of Jermuk city. LPD-15 / Update of Design and Author’s Supervision of Reconstruction of beginning Heritage Hub and Tourism of the road from Garni IBRD / 85720 Post Direct Selection Direct 5,150.00 5,235.99 Signed 2020-08-25 2020-09-01 2020-09-04 2020-09-07 2020-11-01 2020-09-15 2021-12-26 Circuit Development Symphony of Stones monument to Khosrov Forest State Reserve. LIC-02 / Individual Consultancy Services for Individual Expertise Engineer under the Heritage Hub and Tourism Under IBRD / 85720 Post Consultant Open 12,600.00 0.00 2020-09-22 2020-09-22 2020-11-10 2020-12-01 2021-01-05 2022-01-05 World Bank’s Local Economy Circuit Development Implementation Selection and Infrastructure Development Project. LIC-03 / Individual Consultancy Services for Individual Economic analysis under the Heritage Hub and Tourism IBRD / 85720 Post Consultant Open 11,800.00 12,654.23 Signed 2020-09-22 2020-09-22 2020-11-10 2020-10-14 2020-12-01 2020-10-15 2021-01-05 2020-10-16 2022-01-05 World Bank’s Local Economy Circuit Development Selection and Infrastructure Development Project. LIC-04 / Individual Consultancy Services of Legal Individual assistance under the World Heritage Hub and Tourism Under IBRD / 85720 Post Consultant Open 11,600.00 0.00 2020-09-22 2020-09-22 2020-11-10 2020-12-01 2021-01-05 2022-01-05 Bank’s Local Economy and Circuit Development Implementation Selection Infrastructure Development Project. Page 4