The World Bank Implementation Status & Results Report Preparation of a Program Towards Sustainable Flood Management in the Greater Metro Manila Area Project (P145237) Preparation of a Program Towards Sustainable Flood Management in the Greater Metro Manila Area Project (P145237) EAST ASIA AND PACIFIC | Philippines | Water Global Practice | Recipient Executed Activities | Investment Project Financing | FY 2015 | Seq No: 9 | ARCHIVED on 23-Dec-2020 | ISR45090 | Implementing Agencies: Department of Public Works and Highways, Department of Finance Key Dates Key Project Dates Bank Approval Date: 16-Sep-2014 Effectiveness Date: 19-Jun-2015 Original Closing Date: 31-Jan-2017 Revised Closing Date: 30-Jun-2021 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The objective is to prepare priority projects, identified by the flood management master plan, that aim to improve flood management and resilience in and around Metro Manila. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Implementation Status and Key Decisions Consultants have been recruited to support DPWH with the preparation of feasibility studies and subsequently designs for priority interventions for flood management improvement in the Pasig-Marikina River Basin. Alternatives have been analyzed and final feasibility studies were prepared as per terms of reference. The feasibility studies will allow government to make a decision how to proceed with flood management in the river basin. Draft designs are expected by the end of March 2021. Environmental and social consultants are preparing relevant safeguards documents. Risks Overall Risk Rating Risk Category Rating at Approval Previous Rating Current Rating Overall -- Moderate Moderate 5. Results 12/23/2020 Page 1 of 3 The World Bank Implementation Status & Results Report Preparation of a Program Towards Sustainable Flood Management in the Greater Metro Manila Area Project (P145237) Project Development Objective Indicators IN00939948 ►Proposals for Upper Marikina River structural measures fully designed that are technically, economically, socially, and environmentally sound and that are ready for appraisal. (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2.00 Date 22-Dec-2014 31-Dec-2019 30-Nov-2020 30-Jun-2021 IN00939949 ►Proposals for an integrated flood forecasting and early warning system fully designed and ready for appraisal. (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1.00 Date 22-Dec-2014 31-Dec-2019 30-Nov-2020 30-Jun-2021 IN00939950 ►Proposals for institutional arrangements for sustainable flood management in the Greater Metro Manila Area acceptable to the Government of the Philippines and key stakeholders and ready for implementa (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1.00 Date 22-Dec-2014 31-Dec-2019 30-Nov-2020 30-Jun-2021 Intermediate Results Indicators IN00940122 ►Feasibility study for the proposed interventions in Upper Marikina River completed. (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1.00 2.00 2.00 Date 22-Dec-2014 31-May-2019 30-Sep-2020 30-Sep-2020 IN00940121 ►Mid-term report with draft proposals for institutional arrangements for sustainable flood management completed. (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1.00 Date 22-Dec-2014 31-Dec-2019 30-Nov-2020 31-Mar-2021 Data on Financial Performance Disbursements (by loan) 12/23/2020 Page 2 of 3 The World Bank Implementation Status & Results Report Preparation of a Program Towards Sustainable Flood Management in the Greater Metro Manila Area Project (P145237) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P145237 TF-18611 Effective USD 2.73 2.73 0.00 0.52 2.21 19% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P145237 TF-18611 Effective 04-Jun-2015 19-Jun-2015 19-Jun-2015 31-Jan-2017 30-Jun-2021 Cumulative Disbursements Restructuring History Level 2 Approved on 24-Jan-2017 ,Level 2 Approved on 30-Jan-2018 ,Level 2 Approved on 31-Jan-2020 ,Level 2 Approved on 08-Jul-2020 Related Project(s) There are no related projects. 12/23/2020 Page 3 of 3