BF-YOUTH EMPLOYMENT & SKILLS DEVELOPMENT (P130735) I. General 1. Bank’s approval Date of the procurement Plan Original: 2013, version 2: 18/07/2014), version 3: 22/02/2015; version 4: 20/03/2015; version 5: 11/04/2016, version 6 : 16/12/2016 2. Date of General Procurement Notice: Dec 7, 2016 3. Period covered by this procurement plan: The procurement period of project covered from year JANUARY 2017 to December 2018. II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) ≥ US$ 1.000,000 All 2. NCB (Goods) POST REVIEW POST REVIEW 3. ICB (Works) ≥ US$ 5 million All 4. NCB (Works) POST REVIEW POST REVIEW 5. ICB (Non-Consultant Services) ≥ US$ 1.5 million All 6. NCB (Non-Consultant Services) POST REVIEW POST REVIEW 7. Shopping POST REVIEW POST REVIEW 8. Direct Contracting (Works) ≥ US$ 5 million All 9. Direct Contracting (Goods) ≥ US$ 1.5 million All 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Refer to the relevant CDD project implementation document approved by the Bank 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P130735 issued by PCU 5. Any Other Special Procurement Arrangements: Not applicable 6. Summary of the Procurement Packages planned during the first 18 months [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 July 9, 2010 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of 0.19 1 Yes Prior the RFQ (Works) Summary of 0.95 14 Yes Post the RFQ (Goods) Summary of 0.18 2 Yes Post the RFQ (Non- Consultant Services) Summary of NA 0 NA the Direct (Works) Summary of 0.58 8 NA Post the Direct (Goods) Summary of 0.27 5 NA Post the Direct (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) 3. Individual Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $200,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank (Prior / Post) July 9, 2010 US$ million Summary of 0.53 4 2 post, 2 All 4 number of prior packages contracts that have been will be let returned under QCBS Summary of 1.78 12 Post CQS number of contracts that will be let under CQS Summary of 1.37 5 Post Only number of approved contracts that 0.22m will be let immediately under Direct Contracting Summary of 0.01 1 Post Returned number of contracts that will be let under INDV July 9, 2010 PROCUREMENT Burkina Faso : BF-Youth Employment & Skills Development PLAN General Information Country: Burkina Faso Banks Approval Date of the Original Procurement Plan: 2017-04-03 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-06-01 Project ID: P130735 GPN Date: Project Name: BF-Youth Employment & Skills Development Loan / Credit No: IDA / 52560 Executing Agency(ies): Project Coordination Unit Employment and Youth Development of Competences WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PEJDC-10635-CW-RFQ / Réhabilitation de quatre (04) centres d'accueil et d'Orientation Professionnelle des Jeunes Component 1: Labor Intensive Request for Single Stage - One Pending IDA / 52560 Post Limited 190,000.00 0.00 2017-06-25 2017-08-17 2017-10-16 (CAOJ) au profit des communes Public Works Quotations Envelope Implementation de Ouagadougou, de Bobo- Dioulasso, de Ouahigouya et Manga GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PEJDC-10548-GO-RFQ / Acquisition de 250 kits d'apprentissage pour les métiers Component 2: Skills Request for Single Stage - One Pending de la restauration (Pâtisserie, IDA / 52560 Post Limited 75,000.00 0.00 2017-04-09 2017-05-29 2017-06-28 development Quotations Envelope Implementation Boulangerie, Cuisine, laiterie, agroalimentaire) etc...de la CMA- BF BF-PEJDC-10552-GO-RFQ / Acquisition de kits 324 kits Component 2: Skills Request for Single Stage - One Pending d'apprentissage pour les métiers IDA / 52560 Post Limited 97,500.00 0.00 2017-04-09 2017-05-29 2017-06-28 development Quotations Envelope Implementation de coiffure, broderie, couture et tissage de la CMA-BF BF-PEJDC-10564-GO-RFQ / Acquisition d'affiche dans le Component 1: Labor Intensive Request for Single Stage - One Pending IDA / 52560 Post Limited 2,500.00 0.00 2017-04-09 2017-05-13 2017-05-28 cadre de recrutement des Public Works Quotations Envelope Implementation brigadiers des cohortes 4 et 5 BF-PEJDC-10565-GO-RFQ / Acquisition de cartables Component 1: Labor Intensive Request for Single Stage - One Pending IDA / 52560 Post Limited 45,000.00 0.00 2017-04-13 2017-06-01 2017-06-22 minimum pour les trois (03) Public Works Quotations Envelope Implementation cohortes (3-4-5) BF-PEJDC-10568-GO-RFQ / Acquisition de Boites à Component 1: Labor Intensive Request for Single Stage - One Pending IDA / 52560 Post Limited 24,000.00 0.00 2017-04-18 2017-06-09 2017-06-24 pharmacie pour les deux (02) Public Works Quotations Envelope Implementation prochaines cohortes (4-5) BF-PEJDC-10569-GO-RFQ / Acquisition de 327 kits Component 2: Skills Request for Single Stage - One Pending d'apprentissage pour les métiers IDA / 52560 Post Limited 98,000.00 0.00 2017-04-15 2017-06-08 2017-07-08 development Quotations Envelope Implementation du BTP, automobile etc. de la CMA-BF BF-PEJDC-10570-GO-RFQ / Acquisition des qé uipements de Component 2: Skills Request for Single Stage - One Pending IDA / 52560 Post Limited 90,000.00 0.00 2017-04-10 2017-06-01 2017-07-01 protection individuelle pour les development Quotations Envelope Implementation apprentis de la CMA-BF Component 1: Labor Intensive BF-PEJDC-10571-GO-RFQ / Public Works Acquisition de matériel Component 3: Institutional Request for Single Stage - One Pending informatique et péri- informatique IDA / 52560 Capacity Strengthening and Post Limited 95,000.00 0.00 2017-05-15 2017-07-10 2017-08-09 Quotations Envelope Implementation au profit du PTR-HIMO, de la Project Management CMA-BF et de l'UCP Component 2: Skills development BF-PEJDC-10611-GO-DIR / Acquisition de quincaillerie au Component 1: Labor Intensive Pending profit d'une cohorte (1 800 IDA / 52560 Post Direct Selection Direct 144,000.00 0.00 2017-05-07 2017-05-17 2017-07-01 2017-08-30 Public Works Implementation jeunes) de l'année 2018 de la commune d'Ouagadougou BF-PEJDC-10614-GO-DIR / Acquisition d'effet d'habillement Component 1: Labor Intensive Pending au profit d'une cohorte (700 IDA / 52560 Post Direct Selection Direct 84,000.00 0.00 2017-05-07 2017-05-17 2017-07-01 2017-08-30 Public Works Implementation jeunes) de l'année 2018 de la commune de Bobo-Dioulasso BF-PEJDC-10615-GO-DIR / Acquisition de quincaillerie au Component 1: Labor Intensive Pending profit d'une cohorte (700 jeunes) IDA / 52560 Post Direct Selection Direct 56,000.00 0.00 2017-05-14 2017-05-24 2017-07-08 2017-09-06 Public Works Implementation de l'année 2018 de la commune de Bobo-Dioulasso Component 1: Labor Intensive BF-PEJDC-10595-GO-RFQ / Public Works Acquisition des fournitures de Component 3: Institutional bureau-consommables Request for Single Stage - One Pending IDA / 52560 Capacity Strengthening and Post Limited 95,000.00 0.00 2017-10-07 2017-11-28 2017-12-28 informatique au profit du PTR- Quotations Envelope Implementation Project Management HIMO, de la CCI-BF, de la CMA- Component 2: Skills BF et de l'UCP development Page 1 BF-PEJDC-10616-GO-DIR / Acquisition d'effet d'habillement Component 1: Labor Intensive Pending au profit d'une cohorte (375 IDA / 52560 Post Direct Selection Direct 45,000.00 0.00 2017-05-17 2017-05-27 2017-07-11 2017-09-09 Public Works Implementation jeunes) de l'année 2018 de la commune d'Ouahigouya BF-PEJDC-10618-GO-DIR / Acquisition de quincaillerie au Component 1: Labor Intensive Pending profit d'une cohorte (375 jeunes) IDA / 52560 Post Direct Selection Direct 30,000.00 0.00 2017-05-19 2017-05-29 2017-07-13 2017-09-11 Public Works Implementation de l'année 2018 de la commune de Ouahigouya BF-PEJDC-10622-GO-DIR / Acquisition de mobilier pour l'équipement des centres Component 1: Labor Intensive d'orientation et d'accueil des Public Works Request for Single Stage - One Pending jeunes dans les 4 communes et IDA / 52560 Post Limited 94,000.00 0.00 2017-07-26 2017-09-14 2017-10-14 Component 2: Skills Quotations Envelope Implementation le mobilier pour le mobilier pour development le nouveau personnel de la Chambre des Métiers de l'Artisanat BF-PEJDC-10626-GO-DIR / Acquisition de quincaillerie au Component 1: Labor Intensive Pending profit d'une cohorte (125 jeunes) IDA / 52560 Post Direct Selection Direct 10,000.00 0.00 2017-05-19 2017-05-29 2017-07-13 2017-09-11 Public Works Implementation de l'année 2018 de la commune de Manga Component 1: Labor Intensive BF-PEJDC-10620-GO-RFQ / Public Works Acquisition des fournitures de Component 3: Institutional bureau-consommables Request for Single Stage - One Pending IDA / 52560 Capacity Strengthening and Post Limited 95,000.00 0.00 2017-06-17 2017-08-06 2017-09-05 informatique au profit du PTR- Quotations Envelope Implementation Project Management HIMO, de la CCI-BF, de la CMA- Component 2: Skills BF et de l'UCP development BF-PEJDC-11551-GO-RFQ / acquisition d'équipements de Component 1: Labor Intensive protection individuelles pour les Public Works métiers à risques des jeunes Component 3: Institutional Request for Single Stage - One Under apprenants en mécanique et IDA / 52560 Capacity Strengthening and Post Limited 79,060.00 0.00 2017-04-07 2017-01-26 2017-04-28 2017-10-25 Quotations Envelope Implementation conducteurs de produits Project Management dangereux en formation au Component 2: Skills centre de formation en transport development routier et activités auxiliaires BF-PEJDC-11576-GO-DIR / fourniture et administration de Component 1: Labor Intensive vaccins contre les risques du Public Works métier aux apprenants en Component 3: Institutional formation de mécanique et Under IDA / 52560 Capacity Strengthening and Post Direct Selection Direct 600.00 0.00 2017-04-13 2017-04-03 2017-04-18 2017-04-05 2017-05-23 2017-11-19 conduite de produits dangereux, Implementation Project Management au centre de formation en Component 2: Skills transport routier et auxiliaires development par la Direction de la santé des communs BF-PEJDC-10604-GO-RFQ / Component 1: Labor Intensive Request for Single Stage - One Pending Acquisition de 4 matériels roulant IDA / 52560 Post Limited 8,000.00 0.00 2017-04-15 2017-06-06 2017-06-21 Public Works Quotations Envelope Implementation (vélomoteurs hommes) BF-PEJDC-10625-GO-DIR / Acquisition d'effet d'habillement Component 1: Labor Intensive Pending au profit d'une cohorte (125 IDA / 52560 Post Direct Selection Direct 15,000.00 0.00 2017-05-21 2017-05-31 2017-07-15 2017-09-13 Public Works Implementation jeunes) de l'année 2018 de la commune de Manga BF-PEJDC-10606-GO-RFQ / Acquisition d'effet d'habillement Component 1: Labor Intensive Single Stage - One Pending IDA / 52560 Post Request for Bids Open - National 196,000.00 0.00 2017-05-15 2017-05-20 2017-07-01 2017-07-31 2017-09-04 2018-03-03 au profit d'une cohorte de la Public Works Envelope Implementation commune d'Ouagadougou BF-PEJDC-11573-GO-RFB / acquisition des q é uipements par Component 2: Skills Request for Single Stage - One Pending une demande de prix afin IDA / 52560 Post Limited 1,000,000.00 0.00 2017-07-05 2017-08-30 2018-02-26 development Quotations Envelope Implementation é uiper le centre de formation en q tourisme et hôtellerie BF-PEJDC-16615-GO-RFQ / Acquisition de petits matériels et consommable pour Component 1: Labor Intensive Request for Single Stage - One Pending IDA / 52560 Post Limited 8,000.00 0.00 2017-06-08 2017-06-15 2017-06-17 l'expérimentation des crèches Public Works Quotations Envelope Implementation mobiles dans le cadre des THIMO NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PEJDC-10631-NC-RFQ / Location de quatre (04) pelles chargeuses pour les deux (02) Component 1: Labor Intensive Request for Single Stage - One Pending cohortes (4-5) au profit des IDA / 52560 Post Limited 96,000.00 0.00 2017-04-04 2017-05-15 2018-05-15 Public Works Quotations Envelope Implementation communes de Ouagadougou , de Bobo-Dioulasso, de Ouahigouya et Manga BF-PEJDC-10634-NC-DIR / Acquisition de service d- Assurance individuelle accident Component 1: Labor Intensive Pending IDA / 52560 Post Direct Selection Direct 84,000.00 0.00 2017-04-20 2017-04-30 2017-06-14 2018-06-14 au profit des jeunes brigadiers Public Works Implementation THIMO/PEJDC pour les cohortes 4 et 5 BF-PEJDC-10661-NC-DIR / Component 2: Skills Pending Assurance individuelle accident IDA / 52560 Post Direct Selection Direct 40,000.00 0.00 2017-04-03 2017-04-08 2017-05-09 2018-05-04 development Implementation pour les apprentis de la CMA-BF Page 2 BF-PEJDC-10664-NC-DIR / Component 3: Institutional Assurance maladie du personnel Pending IDA / 52560 Capacity Strengthening and Post Direct Selection Direct 90,000.00 0.00 2017-07-06 2017-07-11 2017-08-15 2018-08-10 de l'UCP pour la période 2017- Implementation Project Management 2018 BF-PEJDC-10666-NC-DIR / Component 2: Skills Assurances des véhicules et development Pending motos acquis dans le cadre du IDA / 52560 Component 3: Institutional Post Direct Selection Direct 7,000.00 0.00 2017-07-19 2017-07-24 2017-08-28 2018-08-23 Implementation projet (UCP+A.E) pour la période Capacity Strengthening and 2017-2018 Project Management BF-PEJDC-10667-NC-DIR / Component 2: Skills Under Assurance individuelle accident IDA / 52560 Post Direct Selection Direct 48,000.00 0.00 2017-10-30 2016-11-10 2017-11-04 2016-11-10 2017-12-09 2018-12-04 development Implementation pour les apprentis de la CCI-BF BF-PEJDC-10627-NC-RFQ / Location de quatre (04) Component 1: Labor Intensive Request for Single Stage - One IDA / 52560 Post Limited 84,400.00 0.00 Canceled 2017-04-08 2017-05-28 2018-05-28 camionnettes pour les deux (02) Public Works Quotations Envelope prochaines cohortes (4-5) BF-PEJDC-13211-NC-RFB / Location de camion bennes dans le cadre des travaux Component 1: Labor Intensive Request for Single Stage - One Pending IDA / 52560 Post Limited 93,600.00 0.00 2017-05-20 2017-07-15 2018-01-11 HIMO/PEJDC au profit des Public Works Quotations Envelope Implementation communes de Ouahigouya et de Manga BF-PEJDC-13210-NC-RFB / Location de camion bennes basculantes dans le cadre des Component 1: Labor Intensive Single Stage - One Pending IDA / 52560 Post Request for Bids Open - National 262,080.00 0.00 2017-05-11 2017-05-16 2017-06-27 2017-07-27 2017-08-31 2018-02-27 travaux HIMO/PEJDC au profit Public Works Envelope Implementation des communes de Ouagadougou et de Bobo-Dioulasso. BF-PEJDC-10629-NC-RFB / Location des camions lève conteneurs dans le cadre des Component 1: Labor Intensive Single Stage - One Pending IDA / 52560 Post Request for Bids Open - National 149,760.00 0.00 2017-05-11 2017-05-16 2017-06-27 2017-07-27 2017-08-31 2018-02-27 Travaux HIMO/PEJDC au profit Public Works Envelope Implementation des communes de Ouagadougou et de Bobo-Dioulasso CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PEJDC-10672-CS-CQS / Recrutement de cabinet de Consultant Component 2: Skills Under formation chargé de la formation IDA / 52560 Post Qualification Open - National 21,150.00 0.00 2017-04-04 2017-04-25 2017-06-08 2017-07-08 2017-08-12 2017-09-26 development Implementation de 25 formateurs en Selection entreprenariat BF-PEJDC-10677-CS-CQS / ENTRE: Recrutement de cabinet de formation chargé de la réalisation de Formation à l'esprit Consultant d'entreprise et au management Component 2: Skills Under IDA / 52560 Post Qualification Open - National 113,292.00 0.00 2017-04-04 2017-04-25 2017-06-08 2017-07-08 2017-08-12 2017-11-10 de la nouvelle entreprise de 500 development Implementation Selection jeunes non scolarisés et déscolarisés et le coaching de 250 jeunes pour le montage de leur projet BF-PEJDC-10679-CS-CQS / NORD ZONE A: Recrutement de cabinet de formation chargé de la réalisation de Formation à Consultant l'esprit d'entreprise et au Component 2: Skills Under IDA / 52560 Post Qualification Open - National 147,280.00 0.00 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2017-11-28 management de la nouvelle development Implementation Selection entreprise de 650 jeunes non scolarisés et déscolarisés et le coaching de 325 jeunes pour le montage de leur p BF-PEJDC-10680-CS-CQS / NORD ZONE B: Recrutement de cabinet de formation de la réalisation de Formation à l'esprit Consultant d'entreprise et au management Component 2: Skills Under IDA / 52560 Post Qualification Open - National 147,280.00 0.00 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2017-11-28 de la nouvelle entreprise de 650 development Implementation Selection jeunes non scolarisés et déscolarisés et le coaching de 325 jeunes pour le montage de leur projet BF-PEJDC-10681-CS-CQS / CENTRE SUD: Recrutement de de cabinet de formation chargé de la réalisation de Formation à Consultant l'esprit d'entreprise et au Component 2: Skills Under IDA / 52560 Post Qualification Open - National 67,975.00 0.00 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2017-10-31 management de la nouvelle development Implementation Selection entreprise de 300 jeunes non scolarisés et déscolarisés et le coaching de 150 jeunes pour le montage de leur BF-PEJDC-10682-CS-CQS / CENTRE ZONE A : Recrutement de cabinet de formation chargé de la réalisation de Formation en Consultant sur l'identification d'idée de Component 2: Skills Under IDA / 52560 Post Qualification Open - National 174,955.00 0.00 2017-04-03 2017-04-24 2017-06-12 2017-07-12 2017-08-16 2017-12-07 projet, la création et la gestion development Implementation Selection d'entreprise au profit de 200 jeunes diplômes de la Région du Centre Zone A et le coaching de 1 Page 3 BF-PEJDC-10684-CS-CQS / CENTRE ZONE B: Recrutement de cabinet de formation chargé de la réalisation de Formation Consultant sur l'identification d'idée de Component 2: Skills Under IDA / 52560 Post Qualification Open - National 174,955.00 0.00 2017-04-06 2017-04-27 2017-06-10 2017-07-10 2017-08-14 2017-12-05 projet, la création et la gestion development Implementation Selection d'entreprise au profit de 200 jeunes diplômes de la Région du Centre Zone B et le coaching de 100 j BF-PEJDC-10685-CS-CQS / CENTRE ZONE C: Recrutement de cabinet de formation chargé de la réalisation de Formation Consultant sur l'identification d'idée de Component 2: Skills Under IDA / 52560 Post Qualification Open - National 174,955.00 0.00 2017-04-24 2017-05-15 2017-06-28 2017-07-28 2017-09-01 2017-12-23 projet, la création et la gestion development Implementation Selection d'entreprise au profit de 200 jeunes diplômes de la Région du Centre Zone C et le coaching de 100 j BF-PEJDC-10686-CS-CQS / HAUTS BASSINS: Recrutement de cabinet de formation de la réalisation de formations sur Consultant l'identification d'idée de projet, la Component 2: Skills Under IDA / 52560 Post Qualification Open - National 87,478.00 0.00 2017-04-21 2017-05-12 2017-06-25 2017-07-25 2017-08-29 2017-11-25 création et la gestion development Implementation Selection d'entreprise au profit de 100 jeunes diplôms é et coaching de 50 jeunes diplôms é pour le montage de leur p BF-PEJDC-10687-CS-CQS / NORD: Recrutement de cabinet de formation chargé de la réalisation de Formations sur Consultant l'identification d'idée de projet, la Component 2: Skills Under IDA / 52560 Post Qualification Open - National 43,739.00 0.00 2017-04-14 2017-05-05 2017-06-18 2017-07-18 2017-08-22 2017-10-25 création et la gestion development Implementation Selection d'entreprise au profit de 50 jeunes diplôms é et coaching de 25 jeunes diplôms é pour le montage de leur pro BF-PEJDC-10688-CS-CQS / CENTRE OUEST : Recrutement de cabinet de formation chargé de la réalisation de formations Consultant sur l'identification d'idée de Component 2: Skills Under IDA / 52560 Post Qualification Open - National 65,608.00 0.00 2017-04-25 2017-05-16 2017-06-29 2017-07-29 2017-09-02 2017-11-29 projet, la création et la gestion development Implementation Selection d'entreprise au profit de 75 jeunes diplôms é et coaching de 38 jeunes diplôms é pour le montage de BF-PEJDC-10712-CS-CDS / Recrutement de consultant pour la sensibilisation aux métiers au Consultant profit des brigadiers Component 1: Labor Intensive Under IDA / 52560 Post Qualification Open - National 292,000.00 0.00 2017-04-16 2017-05-01 2017-06-04 2017-06-19 2017-07-20 2018-01-16 THIMO/PEJDC) des communes Public Works Implementation Selection de Ouagadougou , de Bobo- Dioulasso, de Ouahigouya et Manga BF-PEJDC-10953-CS-QCBS / Component 3: Institutional Recrutement d'un cabinet de Quality And Cost- Pending IDA / 52560 Capacity Strengthening and Post Open - National 200,000.00 0.00 2017-01-20 2017-02-10 2017-03-26 2017-04-23 2017-05-23 2017-06-27 2017-08-01 2018-08-01 é aluation du contrôle et suivi v Based Selection Implementation Project Management projet BF-PEJDC-12876-CS-CQS / Recrutement d'un centre pour la formation de 20 jeunes dans le domaine de l'Agro-pastoral à la Consultant Component 2: Skills Under demande de la Fédr é ation des IDA / 52560 Post Qualification Open - National 15,000.00 0.00 2017-05-10 2017-05-10 2017-05-31 2017-06-22 2017-07-03 2017-08-01 2017-10-30 development Implementation organisations professionnelles Selection agricoles de Bagré (FOPACB), besoins exprimés par leurs membres BF-PEJDC-13084-CS-CQS / recrutement d'un centre pour la formation de 30 techniciens endogènes en techniques Consultant Component 2: Skills Under d'apiculture avancée à la IDA / 52560 Post Qualification Open - National 20,000.00 0.00 2017-04-28 2017-04-19 2017-05-19 2017-07-02 2017-07-12 2017-08-16 2017-11-15 development Implementation demande de l'Union Nationale Selection des Apiculteurs pour ses membres pour un prix unitaire de 330 000 FCFA BF-PEJDC-10678-CS-CQS / HAUTS BASSINS: Recrutement de cabinet de formation de la réalisation de Formation à l'esprit Consultant d'entreprise et au management Component 2: Skills Pending IDA / 52560 Post Qualification Open - National 135,950.00 0.00 2017-04-21 2017-05-12 2017-06-25 2017-07-25 2017-08-29 2017-12-14 de la nouvelle entreprise de 600 development Implementation Selection jeunes non scolarisés et déscolarisés et le coaching de 300 jeunes pour le montage de leur projet BF-PEJDC-10965-CS-CDS / recrutement de centre pour la Consultant Formation à la demande de Component 2: Skills Under IDA / 52560 Post Qualification Open - National 78,860.00 0.00 2017-05-12 2017-05-10 2017-06-02 2017-07-16 2017-08-15 2017-09-19 2018-03-18 l'Association des Auto-écoles development Implementation Selection pour assurer la formation de 50 jeunes moniteurs d'auto-écoles BF-PEJDC-10956-CS-QCBS / recrutement d'un cabinet pour la réalisation des Etudes Component 2: Skills Quality And Cost- Pending architecturales techniques suivi IDA / 52560 Post Open - International 260,000.00 0.00 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-02 2017-05-02 development Based Selection Implementation contrôle des travaux du Centre de Formation en Bâtiment et Travaux Publics BF-PEJDC-13062-CS-QCBS / Component 2: Skills Quality And Cost- Pending é ude sur le cadre règlementaire t IDA / 52560 Post Open - National 50,000.00 0.00 2017-05-21 2017-06-11 2017-07-25 2017-08-22 2017-09-21 2017-10-26 2017-11-30 2019-07-23 development Based Selection Implementation de l'apprentissage Page 4 BF-PEJDC-16413-CS-LCS / audit financier et comptable des Component 3: Institutional Pending comptes de l'exercice 2017 du IDA / 52560 Capacity Strengthening and Post Least Cost Selection Open - National 20,000.00 0.00 2017-06-20 2017-07-11 2017-08-24 2017-09-21 2017-10-21 2017-11-25 2017-12-30 2018-02-28 Implementation PEJDC et de ses agences Project Management d'exécution BF-PEJDC-16595-CS-CQS / Consultant Formation de 28 apprentis de la Component 2: Skills Pending IDA / 52560 Post Qualification Open - National 8,400.00 0.00 2017-06-14 2017-07-05 2017-08-18 2017-09-17 2017-10-22 2017-12-21 CMA-BF dans la ville de Bobo- development Implementation Selection é evage Dioulasso en l BF-PEJDC-16617-CS-CQS / Consultant Formation de 13 apprentis de la Component 2: Skills Pending IDA / 52560 Post Qualification Open - National 3,900.00 0.00 2017-06-14 2017-07-05 2017-08-18 2017-09-17 2017-10-22 2017-12-21 CMA-BF de la ville de development Implementation Selection Ouagadougou en l é evage BF-PEJDC-16618-CS-CQS / Consultant Formation de 20 jeunes apprentis Component 2: Skills Pending IDA / 52560 Post Qualification Open - National 6,000.00 0.00 2017-06-14 2017-07-05 2017-08-18 2017-09-17 2017-10-22 2018-01-20 CMA-BFde la ville de Ziniaré en development Implementation Selection restauration BF-PEJDC-16619-CS-CQS / Consultant Formation de 07 apprentis CMA- Component 2: Skills Pending IDA / 52560 Post Qualification Open - National 2,100.00 0.00 2017-06-14 2017-07-05 2017-08-18 2017-09-17 2017-10-22 2018-01-20 BF de la ville de Bobo-Dioulasso development Implementation Selection en restauration BF-PEJDC-16620-CS-CQS / Consultant formation de 03 apprentis CMA- Component 2: Skills Pending IDA / 52560 Post Qualification Open - National 900.00 0.00 2017-06-14 2017-07-05 2017-08-18 2017-09-17 2017-10-22 2018-01-20 BF de la ville de Ouagadougou development Implementation Selection en restauration BF-PEJDC-16621-CS-CQS / Consultant formation des 08 apprentis CMA- Component 2: Skills Pending IDA / 52560 Post Qualification Open - National 2,400.00 0.00 2017-06-14 2017-07-05 2017-08-18 2017-09-17 2017-10-22 2018-01-20 BF de la ville de Dori en development Implementation Selection restauration INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PEJDC-10668-CS-CDS / Recrutement d'un consultant individuel pour l'assistance technique pour assurer la mise Component 2: Skills Pending en Suvre de la formation à la IDA / 52560 Post Direct Selection Direct 98,025.00 0.00 2017-04-20 2017-04-30 2017-07-04 2017-12-31 development Implementation demande à la CCI-BF et pour la mise en Suvre du système de formation par apprentissage à l'a CMA-BF BF-PEJDC-10711-CS-CDS / Recrutement de consultant pour la sensibilisation sur les thèmes Component 1: Labor Intensive Under sociétaux (VIH, l'environnement IDA / 52560 Post Direct Selection Direct 26,964.00 0.00 2017-04-20 2017-05-10 2017-06-20 2017-12-20 Public Works Implementation et le civisme) au profit des brigadiers THIMO/PEJDC de la commune de Manga BF-PEJDC-10745-CS-CDS / NORD: Recrutement de bureaux d'études chargé de la réalisation Component 2: Skills Under IDA / 52560 Post Direct Selection Direct 57,112.00 0.00 2018-02-20 2018-03-02 2018-05-06 2018-07-09 de Coaching de 240 jeunes non development Implementation scolarisés et déscolarisés pour le montage de leur projet BF-PEJDC-10746-CS-CDS / CENTRE SUD: Recrutement de bureaux d'études chargé de la Component 2: Skills Under réalisation de Coaching de 80 IDA / 52560 Post Direct Selection Direct 19,335.00 0.00 2018-02-15 2018-02-25 2018-05-01 2018-06-30 development Implementation jeunes non scolarisés et déscolarisés pour le montage de leur projet BF-PEJDC-10751-CS-CDS / Etudes de sols du CF-TH et Component 2: Skills Under CFBTP par le Laboratoire IDA / 52560 Post Direct Selection Direct 20,000.00 0.00 2017-04-05 2017-04-15 2017-04-07 2017-06-19 2017-09-17 development Implementation National des Travaux Publics (LNBTP) BF-PEJDC-10710-CS-CDS / Recrutement de consultant pour la sensibilisation sur les thèmes Component 1: Labor Intensive Under sociétaux (VIH, l'environnement IDA / 52560 Post Direct Selection Direct 76,329.00 0.00 2017-04-20 2017-05-10 2017-06-15 2017-12-15 Public Works Implementation et le civisme) au profit des brigadiers THIMO/PEJDC de la commune de Ouahigouya BF-PEJDC-10691-CS-CDS / CENTRE ZONE B: Recrutement de cabinet de formation chargé Component 2: Skills Under de la réalisation de Coaching de IDA / 52560 Post Direct Selection Direct 190,374.00 0.00 2018-02-16 2018-02-26 2018-05-02 2018-07-01 development Implementation 800 jeunes non scolarisés et déscolarisés pour le montage de leur projet BF-PEJDC-10693-CS-CDS / HAUTS BASSINS: Recrutement de bureaux d'études chargé de la Component 2: Skills Under réalisation de Coaching de 400 IDA / 52560 Post Direct Selection Direct 95,187.00 0.00 2018-02-19 2018-02-19 2018-03-12 2018-05-11 development Implementation jeunes non scolarisés et déscolarisés pour le montage de leur projet BF-PEJDC-10954-CS-CQS / recrutement de centre pour assurer une formation à la Component 2: Skills Under demande de l'Association des IDA / 52560 Post Direct Selection Direct 149,688.00 0.00 2017-04-25 2017-04-19 2017-05-05 2017-05-11 2017-06-19 2017-12-16 development Implementation Boulangers Pâtissiers pour des jeunes par le centre de formation é ence de Ziniaré de réfr Page 5 BF-PEJDC-10949-CS-CDS / Formation des superviseurs THIMO/PEJDC en secourisme au Component 1: Labor Intensive Under profit des communes de IDA / 52560 Post Direct Selection Direct 4,000.00 0.00 2017-04-10 2017-04-20 2017-06-08 2017-06-23 Public Works Implementation Ouagadougou, de Bobo- Dioulasso, de Ouahigouya et Manga BF-PEJDC-10984-CS-CDS / recrutement d'un centre pour une Formation à la demande des Component 2: Skills Under IDA / 52560 Post Direct Selection Direct 64,885.00 0.00 2017-04-23 2017-04-19 2017-05-08 2017-04-20 2017-06-15 2017-12-12 entreprises , de 80 jeunes pour development Implementation une formation en maintenance et exploitation de Biodigesteurs BF-PEJDC-10985-CS-CDS / recrutement d'un centre pour la Component 2: Skills Under formation à la demande de l' IDA / 52560 Post Direct Selection Direct 88,125.00 0.00 2017-04-24 2017-04-19 2017-05-09 2017-04-20 2017-06-22 2017-12-19 development Implementation Association des Aviculteurs pour former des jeunes en aviculture BF-PEJDC-10708-CS-CDS / Recrutement de consultant pour la sensibilisation sur les thèmes Component 1: Labor Intensive Under sociétaux (VIH, l'environnement IDA / 52560 Post Direct Selection Direct 149,446.00 0.00 2017-04-20 2017-05-10 2017-06-15 2017-12-15 Public Works Implementation et le civisme) au profit des brigadiers THIMO/PEJDC de la commune de Ouagadougou BF-PEJDC-10709-CS-CDS / Recrutement de consultant pour la sensibilisation sur les thèmes Component 1: Labor Intensive Under sociétaux (VIH, l'environnement IDA / 52560 Post Direct Selection Direct 100,290.00 0.00 2017-04-20 2017-05-10 2017-06-19 2017-12-18 Public Works Implementation et le civisme) au profit des brigadiers THIMO/PEJDC de la commune de Bobo-Dioulasso BF-PEJDC-10689-CS-CQS / CENTRE : Recrutement de cabinet de formation chargé de la réalisation de Formation à l'esprit Component 2: Skills Pending d'entreprise et au management IDA / 52560 Post Direct Selection Direct 90,634.00 0.00 2018-02-12 2018-02-22 2018-04-28 2018-06-27 development Implementation de la nouvelle entreprise de 400 jeunes apprenants et le coaching de 200 jeunes pour le montage de leur projet BF-PEJDC-12873-CS-CQS / recrutement d'un centre de formation en vue d'assurer la formation de 70 jeunes dans les Component 2: Skills Individual Consultant Under IDA / 52560 Post Limited 50,000.00 0.00 2017-05-12 2017-05-10 2017-05-12 2017-05-11 2017-05-12 2017-06-02 2017-11-29 filières du BTP( à la demande de development Selection Implementation l'association des professionnels du bâtiments sur besoins exprimés par leur membres BF-PEJDC-13088-CS-CDS / entente directe avec le CENAFIFF centre de formation Component 2: Skills Under IDA / 52560 Prior Direct Selection Direct 450,000.00 0.00 2017-04-28 2017-05-08 2017-07-12 2018-01-30 Tunisien pour la formation des29 development Implementation formateurs et des gestionnaires du CFTH et du CFBTP BF-PEJDC-11531-CS-INDV / Recrutement de consultant individuel pour vérification liste Component 2: Skills Individual Consultant Under des qé uipements, précision des IDA / 52560 Post Limited 40,000.00 0.00 2017-05-11 2017-05-05 2017-05-19 2017-05-09 2017-05-24 2017-05-15 2017-06-09 2017-08-18 development Selection Implementation spécifications techniques et réception des qé uipements du CFTH et du CFBTP BF-PEJDC-14345-CS-INDV / Recrutement d'un consultant Component 3: Institutional Individual Consultant Pending individuel chargé du suivi- IDA / 52560 Capacity Strengthening and Post Limited 36,000.00 0.00 2017-05-30 2017-06-04 2017-06-25 2017-07-30 2018-07-25 Selection Implementation é aluation de la composante v Project Management apprentissage du Projet BF-PEJDC-16421-CS-CDS / Formation de 190 jeunes de la Component 2: Skills Pending IDA / 52560 Post Direct Selection Direct 56,800.00 0.00 2017-06-14 2017-06-24 2017-08-28 2017-10-27 ville de Ziniaré, boussé et Zorgho development Implementation en elevage avec l'ONG APIL BF-PEJDC-16585-CS-CDS / Formation de 189 jeunes Component 2: Skills Pending apprentis des villes de Ziniaré, IDA / 52560 Post Direct Selection Direct 58,000.00 0.00 2017-06-14 2017-06-24 2017-08-28 2017-10-27 development Implementation Zorgho et Boussé en elavage par l'ONG Wend yam Page 6