Bhutan - Regional Connectivity Project : environmental assessment : Environmental assessment report - Feasibility, detailed design and safeguards impact study for proposed Pasakha dry port and inland clearance facility (English)

Abstract

The development objective of Regional Connectivity Project for Bhutan is to develop a Dry Port at Pasakha in the neighborhood of Phuentsholing. Some of the negative impacts and mitigation measures include:(1) dry Port development should follow design ... See More +

Details

  • Palmer, Rachel S.;
  • 2016/06/01 05:18:03
  • Environmental Assessment
  • SFG2437
  • 1
  • 1
  • Bhutan
  • South Asia
  • 2016/09/16 05:15:07
  • Disclosed
  • Environmental assessment report - Feasibility, detailed design and safeguards impact study for proposed Pasakha dry port and inland clearance facility
See More +

Downloads

Complete Report in English

Official version of document (may contain signatures, etc)

*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Citation