Strengthening the National Rural Transport Program (P132750) Since this is an ongoing project, that started in April 2014, submission of a separate summary procurement plan is irrelevant at this stage. PROCUREMENT Nepal : Project for Strengthening the National Rural Transport Program PLAN General Information Country: Nepal Bank’s Approval Date of the Original Procurement Plan: 2017-10-18 2019-09-03 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P132750 GPN Date: Project Name: Project for Strengthening the National Rural Transport Program Loan / Credit No: IDA / 53360, IDA / H8990 Executing Agency(ies): Department of Local Infrastructure WORKS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SNRTP-KAN-W-NCB-10.04- Component A: Institutional UG-070-71 / Kanchanpur: Single Stage - One IDA / 53360 Strengthening, T.A., and Prior Request for Bids Open - National 177,245.00 181,111.90 Signed Rajmarg-Budha- Jhaipura- Envelope Monitoring Gauji-Bridhasharam Road SNRTP-ARG-W-NCB-1-16- Component B: PM-074-75 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 80,000.00 45,793.00 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Maintenance of Amarai Envelope and rehabilitation Jukena Road (8 Km) SNRTP-DHA-W-NCB-6-04- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 125,000.00 70,357.35 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Bhimdhunga-Lamidanda- and rehabilitation Galchi (11 Km) SNRTP-GUL-W-NCB-8-08 - PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Shantipur- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 140,000.00 90,548.37 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Harrachaur-Olibang- and rehabilitation Sindurghanse Road(12 Km) SNRTP-KAN-W-NCB-10-08- PM-073-74 / Periodic Component B: Single Stage - One Maintenance of Bansamiti- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 115,500.00 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Pipalladi-Jonpuri-Ranipur and rehabilitation Road ( 10 KM) SNRTP-KAI-W-NCB-9-08- Component B: PM-074-75 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 145,000.00 126,039.36 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Maintenance of Geta- Envelope and rehabilitation Murkatti Road (12.60 KM) SNRTP-NAW-W-NCB-15-14- Component B: PM-074-75 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 95,000.00 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Maintenance of Manjariya- Envelope and rehabilitation Jamuniya Road (9.00 km) SNRTP-KAP-W-NCB-11-10- PM-074-75 / Periodic Component B: Maintenance of Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 285,000.00 253,899.85 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Krishnanagar- Shisirwa - Envelope and rehabilitation Gugauli -Shivgadi Road (25Km) SNRTP-NAW-W-NCB-15-15- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Arunkhola- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 140,000.00 11,643.24 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Rakachuli-Mityal Road and rehabilitation (11.50 km) SNRTP-PAR-W-NCB-18-09- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Ramghadwa- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 100,000.00 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Jagarnathpur-Milanchowk and rehabilitation Road (9 Km) SNRTP-PAR-W-NCB-18-13- PM-074-75 / Periodic Maintenance of Mudli - Tulsi barwa-Road (6 Km), Component B: Muldi tindubiya-sabithawa Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 375,000.00 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 road(6 km), bedhihari birta Envelope and rehabilitation basantapur road (6 km) padamsadak-bahuwari (6km) and baghi patelchok road (9 km) SNRTP-RAS-W-NCB-20-06- Component B: PM-074-75 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 90,000.00 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Maintenance of Sole- Envelope and rehabilitation Bhimali-Hakubesi Road (5 Km) SNRTP-RAS-W-NCB-20-08- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Dasmure IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 95,000.00 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Seti-Devi Ma Vi. Dhuseni and rehabilitation Road (5 Km) SNRTP-RAU-W-NCB-21-14- Component B: PM-074-75 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 250,000.00 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Maintenance of Prempur Envelope and rehabilitation Gonahi MHW Road (22Km) Page 1 SNRTP-RAU-W-NCB-21-15- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Gamhariya IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 130,000.00 61,964.29 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Birta(BHW) Ragnapur Road and rehabilitation (12Km) SNRTP-RAU-W-NCB-21-16- PM-074-75 / Periodic Component B: Maintenance of Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 148,000.00 49,759.00 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Sukdevchowk Khesaraiya Envelope and rehabilitation Shivnagar Road (9Km) and nahar bridge 30m, Rautahat SNRTP-SAR-W-NCB-25-08- PM-074-75 / Periodic Maintenance of Baghchaur- Component B: Single Stage - One Kotmaula-Patihalna Rural IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 85,000.00 79,114.86 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Road( Phulparasi-Simara- and rehabilitation India Border Road) Maintenance (8 Km) SNRTP-SAR-W-NCB-25-11- PM-074-75 / Periodic Component B: Maintenance of Raniganj Single Stage - One IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 250,000.00 153,128.41 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Parwanipur Road (10 Km) Envelope and rehabilitation Parsa Riterchor (13 km) Sarlahi SNRTP-SIR-W-NCB-26-16- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Mirchaiya IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 250,000.00 130,853.73 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Kalyanpur Siraha Road (23 and rehabilitation km): SNRTP-TAN-W-NCB-29-15- PM-074-75 / Periodic Component B: Maintenance of Bhagwati Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 152,500.00 119,202.66 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Rangapath (Chhirken- Envelope and rehabilitation Maiwal-Nabrung- Tanahunsur-Barbhanjyang ) (13 Km) SNRTP-UDA-W-NCB-30-14- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Basaha IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 315,000.00 207,377.59 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Chaudani Ranitar Road (24 and rehabilitation Km) SNRTP-BHOJ-W-NCB-31- 08-PM-074-75 / Periodic Component B: Maintenance of Taksar- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 180,000.00 149,210.76 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Gumba -Dalgaun- Okhare - Envelope and rehabilitation Dodhalekhani Rd II Pkg (15 Km) SNRTP-BHOJ-W-NCB-31- 09-PM-074-75 / Periodic Component B: Maintenance of Tiwari- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 200,000.00 159,652.90 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Bhanjyang-Chyangre-Bastim Envelope and rehabilitation Thulogaon Duma Sano Duma Road Rd II Pkg (16 Km) SNRTP-SANK-W-NCB-32- 01-PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Khadbari- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 260,000.00 195,019.99 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Ramche-Lebrang-Dake- and rehabilitation Bharabise Rd (16 Km) SNRTP-TER-W-NCB-33-02- Component B: PM-074-75 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 270,000.00 208,807.79 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Maintenance of Serma- Envelope and rehabilitation jaljale-Isibu Sadak Rd (19 Km) SNRTP-SIND-W-NCB-34-03- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Dauchet- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 300,000.00 148,968.33 Signed 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Keureni-Banskharka-Jatatn- and rehabilitation Baruwa Rd (19 Km) SNRTP-GOR-W-NCB-35-04- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Abuwa -B IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 100,000.00 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope irdi-Pauwatar-Kalamata- and rehabilitation Airport Road (8 Km) SNRTP-UDA-W-NCB-30-15- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Murkuchi IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 440,000.00 188,476.80 Signed 2017-11-26 2017-12-01 2017-12-31 2018-01-30 2018-02-21 2019-02-21 Envelope Puwarebhanjyang Bhutar and rehabilitation Road 23 Km SNRTP-BAR-W-NCB-3-07- PM-074-75 / Periodic Maintenance of Bridge Component B: Single Stage - One along Kalaiya- IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 130,000.00 90,724.43 Signed 2017-11-27 2017-12-02 2018-01-01 2018-01-31 2018-02-22 2018-08-21 Envelope Ganjbhabanipur (Bridge and rehabilitation Maintenance) and Kholbi Maduwa Road 9km, Bara SNRTP-MAK-W-NCB-14-07- PM-074-75 / Pulkomukh- Indrayanichaur - Chalti Component B: Single Stage - One (Agrakhola Road) 25 km IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 820,000.00 370,953.95 Signed 2017-11-26 2017-12-01 2017-12-31 2018-01-15 2018-02-06 2019-02-06 Envelope and GAirigaon pakani and rehabilitation manahari road (20 km), Makwanpur Page 2 SNRTP-SIR-W-NCB-26-14- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Dhangadi IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 40,000.00 95,679.16 Signed 2017-11-26 2017-12-01 2017-12-31 2018-01-30 2018-02-21 2019-02-21 Envelope Patari-Jijhaul Road (25 and rehabilitation KM), Siraha SNRTP-SIND-W-NCB-34-04- PM-074-75 / Periodic Component B: Single Stage - One maintenance of Naubise IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 770,000.00 382,179.93 Signed 2017-12-03 2017-12-08 2018-01-07 2018-02-06 2018-02-28 2019-02-28 Envelope Chautara Melamchi, and rehabilitation Sindhupalchok SNRTP-NCB-W-25-12-PM- 074-75 / Periodic Component B: Maintenance of Single Stage - One IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 45,000.00 0.00 Canceled 2017-11-26 2017-12-01 2017-12-31 2018-01-30 2018-02-21 2019-02-21 Dangrakhola Bridge and Envelope and rehabilitation causeway along salanpurhirapur Road (30 m bridge, 10 m causeway) SNRTP-LAM-W-NCB-36-02- UG-074-75 / Karputar- Component B: Single Stage - One Daduwa-Gilung- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 4,100,000.00 0.00 Canceled 2017-12-25 2017-12-30 2018-01-29 2018-02-28 2018-03-22 2019-06-25 Envelope Salmebhanjyang (23.4km), and rehabilitation Lamjung SNRTP-UDA-W-NCB-30-07- Component B: BRI-074-75 / Babiya Khola Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 900,000.00 0.00 Canceled 2018-01-15 2018-01-30 2018-03-01 2018-03-31 2018-04-22 2019-04-22 Bridge at gaighat fattepur Envelope and rehabilitation Road 28 Km (50 m) SNRTP-SAP-W-NCB-24-08- Component B: BRI-074-75 / Jita Khola-I Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 300,000.00 256,685.60 Signed 2018-01-15 2018-01-30 2018-03-01 2018-03-31 2018-04-22 2019-04-22 Bridge at ch23+000 Envelope and rehabilitation (Jandaul-Kushaha Road, 24.55 km) SNRTP-BHOJ-W-NCB-31- 06-BRI-074-75 / Pikhuwa Component B: Single Stage - One Khola Bridge at Bhojpur- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 1,000,000.00 0.00 Canceled 2018-01-15 2018-02-04 2018-03-06 2018-04-05 2018-04-27 2019-05-02 Envelope Manebhanjyang-Ranibas- and rehabilitation Ghoretar Road, (77.6 m) SNRTP-BAN-W-NCB-2-06- Component B: BRI-074-75 / Duduwa Nala Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 790,000.00 0.00 Canceled 2018-01-15 2018-02-09 2018-03-11 2018-04-10 2018-05-02 2019-05-02 Bridge at ch 0+500 Envelope and rehabilitation (Betahani road),(51 m) SNRTP-GUL-W-NCB-8-13- Component B: Single Stage - One BRI-074-75 / Tribeni Khola IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 442,000.00 0.00 Canceled 2018-01-15 2018-01-30 2018-03-01 2018-03-31 2018-04-22 2019-04-22 Envelope Bridge,26 m Gulmi and rehabilitation SNRTP-GUL-W-NCB-8-14- Component B: Single Stage - One BRI-074-75 / Lung Khola IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 272,000.00 0.00 Canceled 2018-01-15 2018-01-30 2018-03-01 2018-03-31 2018-04-22 2019-04-22 Envelope Bridge, 16 m, Gulmi and rehabilitation SNRTP-TER-W-NCB-33-03- PM-074-75 / Periodic Component B: Maintenance of Fakchamara- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 10,000.00 81,112.89 Signed 2018-01-15 2018-02-19 2018-03-21 2018-04-20 2018-05-12 2019-05-12 Panchkanya-Pokari Road Envelope and rehabilitation and Chaparichowk Angdim Sadak,9 km , Terathum SNRTP-DHAN-W-NCB-7-18- PM-074-75 / Periodic Component B: Single Stage - One maintenance of Nunapatti IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 212,000.00 93,948.58 Signed 2017-11-26 2017-12-01 2017-12-31 2018-01-30 2018-02-20 2019-02-20 Envelope Barfi Duhabi Road (13.5) and rehabilitation km SNRTP-DHAN-W-NCB-7-20- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Bisharbohar IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 212,000.00 70,045.85 Signed 2018-03-05 2018-03-10 2018-04-09 2018-04-24 2018-05-15 2019-05-15 Envelope Durbakot thadi road (13 and rehabilitation Km) SNRTP-RUP-W-NCB-22-12- BRI-074-75 / Ghamaha Component B: Single Stage - One Khola Bridge (Buddhanagar- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 960,000.00 628,246.39 Signed 2018-03-05 2018-03-10 2018-04-09 2018-05-09 2018-05-31 2019-05-31 Envelope Serawa-Kisauli-Suryapura and rehabilitation Road)(51m), Rupandehi SNRTP-PAL-W-NCB-17-05- BRI-074-75 / Amlihan Component B: Single Stage - One Bridge at 5+560 (Bastari- IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 720,000.00 583,673.90 Signed 2018-03-05 2018-03-15 2018-04-14 2018-04-29 2018-05-21 2019-05-21 Envelope Jhadewa-Gothadi Road, and rehabilitation 24.940 km) (32 m) SNRTP-GOR-W-NCB-35-05- BRI-074-75 / Ludi Khola Component B: Bridge at 3+00 Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 390,000.00 305,003.42 Signed 2018-03-05 2018-03-20 2018-04-19 2018-05-19 2018-06-10 2019-06-10 (Laxmibazar-Tinmane- Envelope and rehabilitation Jumlichautara-Rainas-Butar Road, (22 m) Gorkha SNRTP-SYA-W-NCB-28-09- BRI-074-75 / Jugle Khola Component B: Bridge at 9+100 of Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 310,000.00 200,114.92 Signed 2018-03-05 2018-03-10 2018-05-11 2018-06-10 2018-07-02 2019-07-02 Naudanda-Bicharichautara- Envelope and rehabilitation Karkineta Rural Road, (23m), Syangja SNRTP-PYU-W-NCB-19-07- Component B: Single Stage - One BRI-074-75 / Hariya Khola IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 320,000.00 206,460.90 Signed 2018-01-15 2018-01-30 2018-03-01 2018-03-31 2018-04-22 2019-04-22 Envelope Bridge,26 m, Pyuthan and rehabilitation Page 3 SNRTP-SIR-W-NCB-26-09- BRI-074-75 / Mainawati Component B: Pending Single Stage - One Khola Bridge at ch 2+700 IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 710,000.00 0.00 Implementat 2018-03-05 2018-03-10 2018-04-09 2018-04-24 2018-05-16 2019-05-16 Envelope Siraha-Sukhipur Road,18.96 and rehabilitation ion km (35 m) SNRTP-GUL-W-NCB-8-12- BRI-074-75 / Harewa Khola Component B: Single Stage - One Bridge at 13+500 ( IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 480,000.00 323,645.34 Signed 2018-03-05 2018-03-10 2018-04-09 2018-04-24 2018-05-16 2019-05-16 Envelope Chorkate-Shantipur Road) and rehabilitation (26 m), Gulmi SNRTP-RAU-W-NCB-21-09- BRI-074-75 / Aduwa (Aruwa) Khola Component B: Under Single Stage - One Bridge,Malahi ghat at IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 370,000.00 233,424.99 Implementat 2018-03-05 2018-03-10 2018-04-09 2018-04-24 2018-05-16 2019-05-16 Envelope 7+530 (Gaur-Kathariya- and rehabilitation ion Santapur-Dostiya- Petbharwa(bara border) Road 25 m, Rautahat SNRTP-KAN-W-NCB-10-05- BRI-074-75 / Construction Component B: of Malaria Khola Bridge.( Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 350,000.00 222,122.98 Signed 2018-01-15 2018-02-14 2018-03-16 2018-04-15 2018-05-07 2019-05-07 25 m span) across Dadthan- Envelope and rehabilitation Baliban Road, KANCHANPUR SNRTP-SANK-W-NCB-32- 06-BRI-074-75 / Pangma Component B: Khola Bridge at 7+120 Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 430,000.00 224,079.00 Signed 2018-03-05 2018-03-10 2018-04-09 2018-04-24 2018-05-16 2019-05-16 (Khandbari-Kalchebesi- Envelope and rehabilitation Pangtha-Dake-Sabhapokhar Road) (26m), Sankhuwasabha SNRTP-ARG-W-NCB-01-11- BRI-074-75 / Samne Khola Component B: Single Stage - One Bridge at Sandhikhark- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 180,000.00 155,320.27 Signed 2018-01-15 2018-01-30 2018-03-01 2018-03-31 2018-04-21 2019-04-21 Envelope Pakale-Dharapani- and rehabilitation Chujathanti Road,(11 m),Argakhachi SNRTP-SANK-W-NCB-32- Component B: 07-BRI-074-75 / Malta Single Stage - One IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 360,000.00 238,431.92 Signed 2018-03-05 2018-03-10 2018-04-09 2018-04-24 2018-05-16 2019-05-16 Khola Bridge, 26 m , Envelope and rehabilitation Sankhuwasabha, SNRTP-MAK-W-NCB-14-08- BRI-074-075 / Dubu Khola, Component B: Single Stage - One Ch 9+800 along Chuniya- IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 320,000.00 223,624.77 Signed 2018-03-05 2018-03-10 2018-04-09 2018-04-24 2018-05-16 2019-05-16 Envelope Namtar-Bharta-Khairang and rehabilitation Road, 20 m Makwanpur SNRTP-PAR-W-NCB-18-08- Component B: BRI-074-075 / Dharar Single Stage - One IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 363,000.00 0.00 Canceled 2018-03-05 2018-03-10 2018-04-09 2018-04-24 2018-05-16 2019-05-16 Khola Bridge,CH 13+130 Envelope and rehabilitation along Janata Road, 20 m , Parsa SNRTP-SAR-W-NCB-25-09- BRI-074-075 / Component B: Single Stage - One Gadauli(Godar) Bridge,Ch IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 400,000.00 240,919.11 Signed 2018-03-05 2018-03-10 2018-04-09 2018-04-24 2018-05-16 2019-05-16 Envelope 2+190 along Karmaiya- and rehabilitation Hathiyol Road, 25 m Sarlahi SNRTP-SAR-W-NCB-25-12- PM-074-75 / Periodic Component B: Maintenance of Single Stage - One IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 45,000.00 30,930.46 Signed 2018-03-05 2018-03-10 2018-04-09 2018-04-26 2018-05-18 2019-05-18 Dangrakhola Bridge and Envelope and rehabilitation causeway along salanpurhirapur Road (30 m bridge, 10 m causeway) SNRTP-BRD-W-NCB-4-08- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Ghorpitta - IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 105,000.00 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Baniyabhar - MRM Road and rehabilitation (9 km) SNRTP-KAS-W-NCB-12-19- PM-074-75 / Periodic Component B: Maintenance of Rakhi- Single Stage - One IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 360,000.00 243,124.96 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Mijauri - Gahate -Toshi Envelope and rehabilitation Road (27.1 Km.) including causeway, Kaski SNRTP-BAR-W-NCB-3-08- PM-074-75 / Periodic Component B: Maintenance of Kuduwa- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 151,000.00 113,664.06 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Langada Chowk-Bazar Envelope and rehabilitation (Bargadhi), Bara ( 0+000 to 13+326, Length- 13.326 km) SNRTP-KAP-W-NCB-11-11- PM-074-75 / Periodic Component B: Maintenance of Jahadi- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 110,000.00 85,190.93 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Bikuli-Bugchi Road, Envelope and rehabilitation Kapilvastu ( 0+000 to 9+500, Lenght 9.5km) SNRTP-KAP-W-NCB-11-13- PM-074-75 / Periodic Component B: Maintenance of Jhanda- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 130,000.00 102,074.76 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Bangai-Motipur-Dohate Envelope and rehabilitation Road, Kapilvastu (0+000 to 14+400, Length 11.05 km) Page 4 SNRTP-DHAN-W-NCB-7-21- PM-074-75 / Periodic Maintenance of Component B: Dhanushadham-Sarsa- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 86,000.00 32,005.09 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Laxmipur-Kesharpatti- Envelope and rehabilitation Bhimanchowk- Road, Dhanusha(0+000 to 7+500, Length-7.50 km) SNRTP-KAP-W-NCB-11-14- PM-074-75 / Periodic Maintenance of Component B: Mahendrakot Bhelai-Kapasi- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 160,000.00 97,341.86 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Purena-Gorusinghe- Envelope and rehabilitation Bakadariya-Chetradehi- Tilaurakot Road, Kapilvastu (0+000 to 20+000, Length 13.9 km) SNRTP-SYA-W-NCB-28-01- Component B: PM-074-75 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 77,670.00 49,057.94 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Maintenance of PUtalikhet- Envelope and rehabilitation Pachamul-Aruchour Road SNRTP-BRD-W-NCB-4-09- PM-074-75 / Periodic Maintenance of PCO Component B: Single Stage - One Chouk (Kakoura)-Damouli- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 125,000.00 0.00 Canceled 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Envelope Juraina-Pachasa Road, and rehabilitation Bardiya (0+000 to 11+1000, Length 11.1 km) SNRTP-DHAN-W-NCB-7-22- PM-074-75 / Periodic Maintenance of Laxmipur- Component B: Bagewa-Gopalpur-Baniniya- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 146,000.00 104,108.61 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Ramdaiya-Bhabadi-Tarapati- Envelope and rehabilitation Sirsiya-Road, Dhanusha (0+000 to 13+440, Length 13.44 km) SNRTP-BRD-W-NCB-4-10- PM-074-75 / Periodic Component B: Maintenance of Puspachouk- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 260,000.00 0.00 Canceled 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Bholagoudi-Danfe Raod, Envelope and rehabilitation Bardiya (0+000 to 22+851, Length 22.85km) SNRTP-DHAN-W-NCB-7-23- PM-074-75 / Periodic Maintenance of Hariharpur- Component B: Single Stage - One Bateshwar-Bhuchakrapur- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 111,190.00 43,800.83 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Envelope Laxminibas-Road, Dhanusha and rehabilitation (0+000 to 10+030, Length- 10.03) SNRTP-GOR-W-NCB-35-05- PM-074-75 / Periodic Component B: Maintenance of Nayapul- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 65,000.00 75,016.07 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Biruwarat-Pauwatar Road, Envelope and rehabilitation Gorkha (0+000 to 8+790, Length 8.79km) SNRTP-SAR-W-NCB-25-13- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Salempur- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 172,300.00 95,238.76 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Envelope Hirapur-Road, Sarlahi and rehabilitation (0+000 to 15+000, Length- 15 km) SNRTP-KAS-W-NCB-12-21- PM-074-75 / Periodic Maintenance of Baidam Component B: Single Stage - One Pame Raod including IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 165,000.00 111,182.86 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Envelope crossing structures, Kaski and rehabilitation (3+000 to 12+064, Length 9.06km and 100m) SNRTP-SIR-W-NCB-26-17- PM-074-75 / Periodic Component B: Maintenance of Lahan- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 85,400.00 40,912.81 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Tarengana Road, Siraha Envelope and rehabilitation (1+500 to 0+100, Length- 7.6 km) SNRTP-KAS-W-NCB-12-22- PM-074-75 / Periodic Maintenance of Kaure- Component B: Single Stage - One Jyamdung-Tanting Road IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 230,000.00 128,715.90 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Envelope along with causeway, Kaski and rehabilitation (0+000 to 17+320, Length 17.32 km and 40m) SNRTP-SIR-W-NCB-26-18- PM-074-75 / Periodic Component B: Maintenance of Lahan- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 215,000.00 125,049.63 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Rameshchowk-Jhajpatti- Envelope and rehabilitation Road, Siraha (0+000 to 19+000, Length-19km) SNRTP-KAS-W-NCB-12-23- PM-074-75 / Periodic Component B: Maintenance of Ghattekhola Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 90,000.00 64,698.80 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Dhampush Khanigaun Envelope and rehabilitation Raod, Kaski (0+000 to 7+500), Length 7.5km SNRTP-SAP-W-NCB-24-15- PM-074-75 / Periodic Component B: Maintenance of Chapin- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 44,000.00 30,930.76 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Khola Bridge (Kharchuiya Envelope and rehabilitation Kachan Road), Saptari (3+450 to 3+477, Length- 27.35m) Page 5 SNRTP-DAN-W-NCB-5-14- PM-074-75 / Periodic Component B: Maintenance of Simthana- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 100,000.00 60,844.77 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Khaireni Jumlekula Road, Envelope and rehabilitation Dang (0+000 to 8+5000, Length 8.5km) SNRTP-SAP-W-NCB-24-16- PM-074-75 / Periodic Component B: Maintenance of Hariharpur- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 119,000.00 74,298.62 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Pakari-Bishahariya-Tilanthi- Envelope and rehabilitation Road, Saptari (0+000 to 10+000, Length-10 km) SNRTP-DAN-W-NCB-5-15- PM-074-75 / Periodic Component B: Maintenance of Tarigaun- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 57,000.00 48,785.18 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Bhojpur-Khausapur Rural Envelope and rehabilitation Road, Dang (0+000 to 5+000, Length 5km) SNRTP-DAN-W-NCB-5-16- PM-074-75 / Periodic Component B: Maintenance of Sarra- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 190,000.00 103,072.62 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Saudiyar-Dharna-Duruwa Envelope and rehabilitation Raod, Dang (0+000 to 15+5000),Length 15.5km SNRTP-BAR-W-NCB-3-09- PM-074-75 / Periodic Component B: Maintenance of Kolbi- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 137,000.00 100,543.90 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Baragadhi-Lautan- Road , Envelope and rehabilitation Bara (0+000 to 11+571, Length-11.571 km) SNRTP-ARG-W-NCB-1-17- PM-074-75 / Periodic Maintenance of Chutrabesi- Component B: Single Stage - One Pakle-DharapanipRajame- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 290,000.00 132,387.54 Signed 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Envelope Pyutha Road, Arghakhanchi and rehabilitation (0+250 to 25+500, Length 25.25km) SNRTP-DHA-W-NCB-6-06- UG-074-75 / Upgrading of Component B: Pending Single Stage - One Dhadingbeshi-Sankosh- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 350,000.00 0.00 Implementat 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Envelope Tipling Road, Dhading and rehabilitation ion (Length 2 km) SNRTP-SUR-W-NCB-27-16- PM-074-75 / Periodic Maintenance of Baddichaur- Guthu-Bijaura-Benighat-Doti- Component B: Single Stage - One Road (Babiyachaur-Guthu- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 174,000.00 0.00 Canceled 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Envelope Section), Surkhet (17+600 and rehabilitation to 29+657, Length- 12.057km, Crossing Structure-1+100 to 9+900, Length-69 m) SNRTP-BAN-W-NCB-2-09- PM-074-75 / Periodic Maintenance of Chaulika Component B: Single Stage - One Chowk (RRM)- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 60,000.00 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Mahendranagar-Hirminiya- and rehabilitation Holiya (Nayabasti Border) Road (6km) SNRTP-BAN-W-NCB-2-09- PM-074-75-2 / Periodic Maintenance of Chaulika Component B: Single Stage - One Chowk (RRM)- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 60,000.00 0.00 Canceled 2018-06-05 2018-06-09 2018-07-09 2018-08-08 2018-08-22 2019-06-18 Envelope Mahendranagar-Hirminiya- and rehabilitation Holiya (Nayabasti Border) Road (6km) SNRTP-BAN-W-NCB-2-10- PM-074-75 / Periodic Maintenance of Chandani Component B: Chowk(MRM)-Titihiriya- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 130,000.00 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Simalghari(Sonpur)- Envelope and rehabilitation Udharapur-Gaughat Road (12km) SNRTP-BAN-W-NCB- 2-10-PM-074-75 SNRTP-BAN-W-NCB-2-10- PM-074-75-2 / Periodic Maintenance of Chandani Component B: Single Stage - One Chowk(MRM)-Titihiriya- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 130,000.00 114,532.98 Signed 2018-06-06 2018-06-10 2018-07-10 2018-08-09 2018-08-23 2019-06-19 Envelope Simalghari(Sonpur)- and rehabilitation Udharapur-Gaughat Road (12km) SNRTP-PYU-W-NCB-19-09- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Kumaltar- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 115,000.00 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Kondrachaur-Ratapani and rehabilitation Road(10 Km) SNRTP-PYU-W-NCB-19-09- PM-074-75-2 / Periodic Component B: Single Stage - One Maintenance of Kumaltar- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 11,500.00 119,292.69 Signed 2018-06-06 2018-06-10 2018-07-10 2018-08-09 2018-08-23 2019-06-19 Envelope Kondrachaur-Ratapani and rehabilitation Road(10 Km) SNRTP-RUP-W-NCB-22-13- PM-074-75 / Periodic Component B: Maintenance of Patkhouli- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 125,000.00 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Lothpura-Gauri- Envelope and rehabilitation S shaniya-PartitoIe- Ramnagar Road (12 km) Page 6 SNRTP-RUP-W-NCB-22-13- PM-074-75-2 / Periodic Component B: Maintenance of Patkhouli- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 85,000.00 60,964.57 Signed 2018-06-06 2018-06-10 2018-07-10 2018-08-09 2018-08-23 2019-06-19 Lothpura-Gauri- Envelope and rehabilitation Sisaniya-PartitoIe-Ramnagar Road (12 km) SNRTP-RUP-W-NCB-22-14- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Bansghadi- IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 125,000.00 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Gaj edi- Suryapura Road and rehabilitation (11 km), Rupendehi SNRTP-RUP-W-NCB-22-14- PM-074-75-2 / Maintenance Component B: Single Stage - One of Bansghadi-Gajedi- IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 125,000.00 92,883.60 Signed 2018-06-06 2018-06-10 2018-07-10 2018-08-09 2018-08-23 2019-06-19 Envelope Suryapura Road (11 km), and rehabilitation Rupendehi SNRTP-RUP-W-NCB-22-15- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of Bhangaiya IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 220,000.00 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Envelope Thu. Piprahawa Karauta and rehabilitation Semara Road (20km) SNRTP-RUP-W-NCB-22-15- PM-074-75-2 / Periodic Component B: Single Stage - One Maintenance of Bhangaiya IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 220,000.00 168,570.30 Signed 2018-06-06 2018-06-10 2018-07-10 2018-08-09 2018-08-23 2019-06-19 Envelope Thu- Piprahawa Karauta and rehabilitation Semara Road (20km) SNRTP-RUP-W-NCB-22-16- PM-074-75 / Periodic Component B: Maintenance of Tunihawa Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 210,000.00 0.00 Canceled 2017-11-26 2017-11-30 2017-12-30 2018-01-29 2018-02-20 2019-02-20 Mukundagadh Envelope and rehabilitation Rayapur(semara) Road (19km) SNRTP-RUP-W-NCB-22-16- PM-074-75-2 / Periodic Component B: Maintenance of Tunihawa Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 210,000.00 159,854.20 Signed 2018-06-06 2018-06-10 2018-07-10 2018-08-09 2018-08-23 2019-06-19 Mukundagadh Envelope and rehabilitation Rayapur(semara) Road (19km) SNRTP-BAN-W-NCB-2-07- Component B: BRI-074-75 / Gandhiyanala Single Stage - One IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 160,000.00 0.00 Canceled 2018-03-05 2018-03-10 2018-04-09 2018-04-24 2018-05-16 2019-05-16 Bridge at puraina,11 m Envelope and rehabilitation Banke SNRTP-BAN-W-NCB-2-07- Component B: BRI-074-75-2 / Gandhaila Single Stage - One IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 160,000.00 100,631.40 Signed 2018-06-06 2018-06-11 2018-07-11 2018-08-10 2018-08-24 2019-07-15 Nala Bridge at Puraina,11 Envelope and rehabilitation m Banke SNRTP-PYU-W-NCB-19-07- UG-074-75 / Upgrading of Component B: Single Stage - One Cherneta-Puranthanti- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 380,000.00 0.00 Canceled 2018-05-08 2018-05-13 2018-06-12 2018-06-27 2018-07-11 2019-07-11 Envelope Jogitari Road,Pyuthan ( and rehabilitation Length 2.45km ) SNRTP-PYU-W-NCB-19-08- UG-074-75 / Upgrading of Component B: Single Stage - One Chujathati- Argakhachi IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 380,000.00 224,146.95 Signed 2018-06-25 2018-06-30 2018-07-30 2018-08-14 2018-08-28 2019-07-09 Envelope Road,Pyuthan ( Length and rehabilitation 2.45km ) SNRTP-KAP-W-NCB-11-12- PM-074-75 / Periodic Maintenence of Component B: Single Stage - One Chakarchauda-Siswa- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 120,000.00 90,580.12 Signed 2018-06-25 2018-06-30 2018-07-30 2018-08-14 2018-08-28 2019-07-09 Envelope Autkoniya-Dohani Road and rehabilitation (0+000 to 10+500, Length 10.5km) SNRTP-UDA-W-NCB-30-16- PM-074-75 / Periodic Component B: Maintenance of Nepaltar- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 210,000.00 113,802.79 Signed 2018-06-25 2018-06-30 2018-07-30 2018-08-14 2018-08-28 2019-07-09 Udayapur-Gadhi- Road , Envelope and rehabilitation Udayapur (0+000 to 15+000, Length- 15 km) SNRTP-KAS-W-NCB-12-20- PM-074-75 / Periodic Component B: Maintenance of Lamachaur- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 120,000.00 76,344.94 Signed 2018-06-25 2018-06-30 2018-07-30 2018-08-14 2018-08-28 2019-07-09 Machhapuchhre Road, Envelope and rehabilitation Kaski (8+5000 to 18+000, Length 9.5km) SNRTP-TER-W-NCB-33-02- UG-074-75 / Upgrading of Component B: Pending Single Stage - One Myanglung-Okhre-Sukrabare- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 1,100,000.00 0.00 Implementat 2018-06-25 2018-06-30 2018-07-30 2018-08-14 2018-08-28 2019-07-09 Envelope Chaparichowk-Dagappa and rehabilitation ion Road , Length 12 km SNRTP-PAR-W-NCB-18-09- PM-074-75-2 / Periodic Component B: Single Stage - One Maintenance of Ramghadwa- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 100,000.00 54,881.73 Signed 2018-12-05 2018-12-09 2019-01-08 2019-01-23 2019-02-14 2019-07-14 Envelope Jagarnathpur-Milanchowk and rehabilitation Road (9 Km) Page 7 SNRTP-PAR-W-NCB-18-13- PM-074-75-2 / Periodic Maintenance of Mudli - Tulsi barwa-Road (6 Km), Component B: Muldi tindubiya-sabithawa Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 375,000.00 245,760.63 Signed 2018-12-05 2018-12-09 2019-01-08 2019-01-23 2019-02-14 2019-07-14 road(6 km), bedhihari birta Envelope and rehabilitation basantapur road (6 km) padamsadak-bahuwari (6km) and baghi patelchok road (9 km) SNRTP-PAR-W-NCB-18-08- BRI-074-075-2 / Dharar Component B: Pending Single Stage - One Khola Bridge,CH 13+130 IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 363,000.00 0.00 Implementat 2018-12-05 2018-12-10 2019-01-09 2019-01-24 2019-02-15 2019-07-15 Envelope along Janata Road, 20 m , and rehabilitation ion Parsa SNRTP-GOR-W-NCB-35-04- PM-074-75-2 / Periodic Component B: Single Stage - One Maintenance of Abuwa - IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 100,000.00 75,016.07 Signed 2018-12-12 2018-12-16 2019-01-15 2019-01-30 2019-02-21 2019-07-15 Envelope Birdi-Pauwatar-Kalamata- and rehabilitation Airport Road (8 Km) SNRTP-BAN-W-NCB-2-09- PM-074-75-2-2 / Periodic Maintenance of Chaulika Component B: Single Stage - One Chowk (RRM)- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 60,000.00 51,311.77 Signed 2018-12-12 2018-12-16 2019-01-15 2019-01-30 2019-02-13 2019-07-13 Envelope Mahendranagar-Hirminiya- and rehabilitation Holiya (Nayabasti Border) Road (6 km) SNRTP-KAN-W-NCB-10-08- PM-073-74-2 / Periodic Component B: Single Stage - One Maintenance of Bansamiti- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 115,500.00 78,313.32 Signed 2018-12-12 2018-12-16 2019-01-15 2019-01-30 2019-02-21 2019-07-15 Envelope Pipalladi-Jonpuri-Ranipur and rehabilitation Road ( 10 KM) SNRTP-NAW-W-NCB-15-14- Component B: PM-074-75-2 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 95,000.00 0.00 Canceled 2018-12-12 2018-12-16 2019-01-15 2019-01-30 2019-02-21 2019-07-15 Maintenance of Manjariya- Envelope and rehabilitation Jamuniya Road (9.00 km) SNRTP-RAU-W-NCB-21-14- Component B: PM-074-75-2 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 250,000.00 188,456.93 Signed 2018-12-12 2018-12-16 2019-01-15 2019-01-30 2019-02-21 2019-07-15 Maintenance of Prempur Envelope and rehabilitation Gonahi MHW Road (22Km) SNRTP-RAU-W-NCB-21-16- BRI-075-76 / Ajagaili Box Component B: Pending Single Stage - One Bridge along Gaur-Banjarha- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 150,000.00 0.00 Implementat 2018-12-20 2018-12-25 2019-01-24 2019-02-08 2019-03-02 2019-07-15 Envelope Auriya-Dumariya- and rehabilitation ion Bishanpatti-Inerwari Road SNRTP-RAS-W-NCB-20-06- Component B: PM-074-75-2 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 90,000.00 36,200.53 Signed 2018-12-16 2018-12-20 2019-01-19 2019-02-03 2019-02-25 2019-07-15 Maintenance of Sole- Envelope and rehabilitation Bhimali-Hakubesi Road (5 Km) SNRTP-BHOJ-W-NCB-31- 10-PM-075-76 / Periodic Component B: Maintenance of Kulung- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 90,000.00 107,924.97 Signed 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Chaukidanda-Khattamma Envelope and rehabilitation Road, Bhojpur (0+000 to 7+500, Length 7.50 km) SNRTP-BHOJ-W-NCB-31- 11-PM-075-76 / Periodic Component B: maintenance of Khairang Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 105,360.00 109,375.07 Signed 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Patalepani Hasanpur Road, Envelope and rehabilitation Bhojpur (0+000 to 8+780, Length 8.78 km) SNRTP-SANK-W-NCB-32- 09-PM-075-76 / Periodic maintenance of Khandbari Component B: Single Stage - One Badrebi Wana Liglig IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 582,238.00 395,758.17 Signed 2019-02-24 2019-03-01 2019-03-31 2019-04-15 2019-04-29 2019-10-26 Envelope Chainpur Road, and rehabilitation Shankhuwasabha (0+000 to 28+000, Length 28.00 km) SNRTP-SANK-W-NCB-32- 10-PM-075-76 / Periodic maintenance of Khadabari Component B: Single Stage - One Kalchebesi Pangtha Dake IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 204,000.00 196,535.53 Signed 2019-02-24 2019-03-01 2019-03-31 2019-04-15 2019-04-29 2019-10-26 Envelope Barhabise, and rehabilitation Shankhuwasabha(0+000 to 17+000, Length 17.00 km) SNRTP-MAH-W-NCB-13-08- PM-075-76 / Periodic Component B: Maintenance of Highway - Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 56,534.00 0.00 Canceled 2019-02-24 2019-03-01 2019-03-31 2019-04-15 2019-04-29 2019-10-26 Khairmara Road, Mahottari Envelope and rehabilitation (0+000 to 4+622, Length 4.62 km) SNRTP-MAH-W-NCB-13-09- PM-075-76 / Periodic Maintenance of Bagada- Component B: Single Stage - One Anaharban-dharampur- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 81,195.00 46,851.67 Signed 2019-02-24 2019-03-01 2019-03-31 2019-04-15 2019-04-29 2019-10-26 Envelope Singyahi Road, Mahottari and rehabilitation (0+000 to 7+703, Length 7.71 km) SNRTP-SAR-W-NCB-25-13- PM-075-76 / Periodic Component B: Under Single Stage - One Maintenance of Phuljhor IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 102,240.00 0.00 Implementat 2019-02-24 2019-03-01 2019-03-31 2019-04-15 2019-04-29 2019-10-26 Envelope KalinjorRoad, Sarlahi and rehabilitation ion (0+000 to 9+000, Length- 9.00 km) Page 8 SNRTP-SAR-W-NCB-25-14- PM-075-76 / Periodic Component B: Under Maintenance of Sirsiya Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 72,226.00 0.00 Implementat 2019-02-24 2019-03-01 2019-03-31 2019-04-15 2019-04-29 2019-10-26 Hempur Barahthaya Road, Envelope and rehabilitation ion Sarlahi (0+000 to 6+360, Length- 6.36 km) SNRTP-SAP-W-NCB-24-17- PM-075-76 / Periodic Component B: Under Maintenance of Mahuli Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 23,358.00 0.00 Implementat 2019-02-24 2019-03-01 2019-03-31 2019-04-15 2019-04-29 2019-10-26 khola Bridge of Bhardaha Envelope and rehabilitation ion Danada Pakari Road, Saptari ( Length- 13.5 m) SNRTP-ARG-W-NCB-1-18- PM-075-76 / Periodic Component B: maintenance of Gachchhe- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 231,882.00 0.00 Canceled 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Dhikura-Dhanchaur-Tamatal Envelope and rehabilitation road (length 19.50 km) Arghakhanchi district SNRTP-ARG-W-NCB-1-19- PM-075-76 / Periodic Component B: maintenance of Ghumti- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 322,435.00 0.00 Canceled 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Tingire-palpa road (length Envelope and rehabilitation 26.96 km), Arghakhanchi district SNRTP-ARG-W-NCB-1-20- PM-075-76 / Periodic maintenance of Chutrabeshi- Component B: Single Stage - One Kura-Nuwakot-jinji-Asurkot- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 292,680.00 0.00 Canceled 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Envelope Jogitari-Pyuthan and rehabilitation road (length 24.39 km) Arghakhanchi district SNRTP-ARG-W-NCB-1-21- PM-075-71 / Periodic maintenance of Sandhikharka - Arga - Component B: Single Stage - One Maidan - Dharampani - IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 117,091.00 84,392.45 Signed 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Envelope Hile (Chutrabeshi- and rehabilitation Dharampani-Maidan- Raikhande )Road (length 9.80 km) Arghakhanchi district SNRTP-ARG-W-NCB-1-22- PM-075-71 / Periodic maintenance of Component B: Single Stage - One Chyandanada-Dirvan-Khana- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 281,787.00 0.00 Canceled 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Envelope Khandaha-Sabdanda- and rehabilitation Dadakatari (length 23.52 km) Arghakhanchi district SNRTP-PYU-W-NCB-19-10- PM-075-76 / Periodic Component B: Single Stage - One maintenance of Bijuwa- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 817,680.00 70,196.05 Signed 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Envelope Dungethani road (length and rehabilitation 6.90 km) Pythan district SNRTP-SAL-W-NCB-23-08- PM-075-76 / Periodic Component B: Pending Single Stage - One maintenance of Luham- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 177,240.00 0.00 Implementat 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Envelope Kavre-Rampur road (length and rehabilitation ion 14.77 km) Salyan district. SNRTP-PAL-W-NCB-17-08- PM-075-76 / Periodic Component B: Single Stage - One Maintenance of Mumin IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 120,000.00 84,158.91 Signed 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Envelope Devinagar Japla Road, and rehabilitation Palpa ( Length-10 km) SNRTP-KAS-W-NCB-12-09- UG-075-76 / Component B: Pending Upgrading/Rehabilitation of Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 75,000.00 0.00 Implementat 2019-04-26 2019-05-03 2019-06-02 2019-06-17 2019-07-01 2019-11-30 Chhorepatan-Kirsti- Envelope and rehabilitation ion Nirmalpokhari-Bhartpokhari Road (Pkg II) SNRTP-BRD-W-NCB-4-09- PM-074-75 -2 / Periodic Maintenance of PCO Component B: Single Stage - One Chouk (Kakoura)-Damouli- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 125,000.00 102,528.73 Signed 2019-04-23 2019-04-28 2019-05-28 2019-06-12 2019-06-26 2019-11-30 Envelope Juraina-Pachasa Road, and rehabilitation Bardiya (0+000 to 11+1000, Length 11.1 km) SNRTP-NAW-W-NCB-15-14- Component B: PM-074-75-2-2 / Periodic Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 95,000.00 81,258.40 Signed 2019-04-23 2019-04-27 2019-05-27 2019-06-11 2019-07-03 2019-11-30 Maintenance of Manjariya- Envelope and rehabilitation Jamuniya Road (9.00 km) SNRTP-ARG-W-NCB-1-18- PM-075-76-2 / Periodic Component B: Pending maintenance of Gachchhe- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 231,882.00 0.00 Implementat 2019-07-09 2019-07-10 2019-08-09 2019-08-24 2019-09-07 2019-12-31 Dhikura-Dhanchaur-Tamatal Envelope and rehabilitation ion road (length 19.50 km) Arghakhanchi district SNRTP-ARG-W-NCB-1-19- PM-075-76-2 / Periodic Component B: Pending maintenance of Ghumti- Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 322,435.00 0.00 Implementat 2019-07-09 2019-07-10 2019-08-09 2019-08-24 2019-09-07 2019-12-31 Tingire-palpa road (length Envelope and rehabilitation ion 26.96 km), Arghakhanchi district Page 9 SNRTP-ARG-W-NCB-1-20- PM-075-76-2 / Periodic maintenance of Chutrabeshi- Component B: Pending Single Stage - One Kura-Nuwakot-jinji-Asurkot- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 292,680.00 0.00 Implementat 2019-07-09 2019-07-10 2019-08-09 2019-08-24 2019-09-07 2019-12-31 Envelope Jogitari-Pyuthan road and rehabilitation ion (length 24.39 km) Arghakhanchi district SNRTP-ARG-W-NCB-1-22- PM-075-71-2 / Periodic maintenance of Component B: Pending Single Stage - One Chyandanada-Dirvan-Khana- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 281,787.00 0.00 Implementat 2019-07-09 2019-07-10 2019-08-09 2019-08-24 2019-09-07 2019-12-31 Envelope Khandaha-Sabdanda- and rehabilitation ion Dadakatari (length 23.52 km) Arghakhanchi district SNRTP-MAH-W-NCB-13-08- PM-075-76-2 / Periodic Component B: Under Maintenance of Highway - Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 56,534.00 0.00 Implementat 2019-07-12 2019-07-14 2019-08-13 2019-08-28 2019-09-11 2019-12-31 Khairmara Road, Mahottari Envelope and rehabilitation ion (0+000 to 4+622, Length 4.62 km) SNRTP-SAP-W-NCB-24-18- PM-075-76 / Periodic Component B: Maintenance of Rupnagar Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 110,873.00 0.00 Canceled 2019-02-24 2019-03-01 2019-03-31 2019-04-15 2019-04-29 2019-10-26 Sarwanpur Goghanpur Envelope and rehabilitation Road, Saptari (0+000 to 9+760, Length-9.76km) SNRTP-MAH-W-NCB-13-07- PM-075-76 / Periodic Maintenance of Component B: Ragunathpur - Sonama - Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 216,030.00 0.00 Canceled 2019-02-24 2019-03-01 2019-03-31 2019-04-15 2019-04-29 2019-10-26 Sundarpur - Bharatpur - Envelope and rehabilitation Laksminiya(Highway), Mahottari (0+000 to 18+980, Length 18.98 km) SNRTP-SANK-W-NCB-32- 08-PM-075-076 / Periodic Maintenance of Component B: Single Stage - One Manebhanjyang-Sitalpati- IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 168,000.00 0.00 Canceled 2019-02-24 2019-03-01 2019-03-31 2019-04-15 2019-04-29 2019-10-26 Envelope Heluwabeshi Road, and rehabilitation Shankhuwasabha (0+000 to 14+000, Length 14.00 km) SNRTP-SIND-W-NCB-34-06- PM-075-76 / Periodic Component B: Maintenance of Sunkoshi Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 177,000.00 0.00 Canceled 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Dhuskun Piskar Road, Envelope and rehabilitation Sindhupalchwok (0+000 to 14+750, Length-14.75 km) SNRTP-SIND-W-NCB-34-05- PM-075-76 / Periodic Component B: Maintenance of Okhreni Single Stage - One IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 120,000.00 0.00 Canceled 2019-02-24 2019-02-28 2019-03-30 2019-04-14 2019-04-28 2019-10-25 Selang Golchhe Road, Envelope and rehabilitation Sindhupalchwok (0+000 to 10+000, Length-10 km) SNRTP-RAS-W-NCB-20-08- PM-074-75-2 / Periodic Component B: Single Stage - One Maintenance of Dasmure IDA / 53360 Maintenance, upgrading, Post Request for Bids Open - National 95,000.00 0.00 Canceled 2018-12-16 2018-12-20 2019-01-19 2019-02-03 2019-02-25 2019-07-15 Envelope Seti-Devi Ma Vi. Dhuseni and rehabilitation Road (5 Km) SNRTP-SAP-W-NCB-24-14- PM-074-75 / Periodic Component B: Single Stage - One Maintenance of kalyanpur- IDA / H8990 Maintenance, upgrading, Post Request for Bids Open - National 170,000.00 0.00 Canceled 2017-11-27 2017-12-02 2018-01-01 2018-01-31 2018-02-21 2019-02-21 Envelope Phulbariya-Banaula Banauli and rehabilitation Kushaha Road, Saptari GOODS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SNRTP-CPCU-G-DP-17-074- Component A: Institutional 75 / Purchase of Laptop, IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 5,000.00 3,760.65 Completed 2018-01-15 2018-01-30 2018-02-02 2018-03-04 Tablet and Desktop set Monitoring (one nos Each) SNRTP-CPCU-G-DP-18-074- Component A: Institutional 75 / Purchase of Smart TV IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 1,500.00 1,678.17 Completed 2018-01-15 2018-01-20 2018-01-23 2018-02-22 for meeting HAll Monitoring Component A: Institutional SNRTP-CPCU-U-DP-16-074- IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 5,000.00 4,362.08 Completed 2018-01-15 2018-01-20 2018-02-10 2018-04-11 75 / Purchase of AC 4 Nos Monitoring SNRTP-CPCU-G-RFQ-19- 075-76 / Purchase of Component A: Institutional Request for Single Stage - One Desktop Computer : 2 set; IDA / H8990 Strengthening, T.A., and Post Limited 5,000.00 3,096.73 Completed 2019-06-25 2019-08-20 2019-12-31 Quotations Envelope Laser Printer: 2 set and Monitoring Photocopy machine 1 set SNRTP-CPCU-G-RFQ-20- Component A: Institutional Request for Single Stage - One 075-76 / Purchase of IDA / H8990 Strengthening, T.A., and Post Limited 4,500.00 3,590.65 Completed 2019-06-25 2019-08-20 2019-12-31 Quotations Envelope Laptop : 3 sets Monitoring SNRTP-CPCU-G-RFQ-21- Component A: Institutional Request for Single Stage - One 075-76 / Purchase of Sofa IDA / H8990 Strengthening, T.A., and Post Limited 3,000.00 2,114.90 Completed 2019-06-25 2019-08-13 2019-12-31 Quotations Envelope set, Carpet and Revolving Monitoring chair. Page 10 SNRTP-CPCU-G-RFQ-22- Component A: Institutional 075-76 / Purchase of Request for Single Stage - One IDA / H8990 Strengthening, T.A., and Post Limited 1,000.00 624.83 Completed 2019-06-25 2019-08-20 2019-12-31 Digital Camera : 2 nos. Quotations Envelope Monitoring and Scanner: 2 nos. NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SNRTP-CPCU-S-SSS-45- 072-073 / NOL to Minutes of Negotiations and Draft Component A: Institutional Negotiated Contract with IDA / H8990 Strengthening, T.A., and Prior Direct Selection Direct 2,572,163.00 2,572,163.00 Signed ILO for three(03) new Monitoring districts( Lamjung, Gorkha and Sindhupalchowk), Single Source Selection SNRTP-CPCU-S-SSS-25- 070-071 / Contract variation - Consultancy Component A: Institutional Services for Providing IDA / H8990 Strengthening, T.A., and Prior Direct Selection Direct 898,677.00 7,400,265.00 Canceled Technical Support to Monitoring Routine Maintenance System of Rural Roads and Bridges SNRTP-CPCU-S-DS-60-074- Component A: Institutional 75 / Financial Management IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 8,500.00 8,918.78 Signed 2017-11-26 2017-12-01 2017-12-12 2019-12-12 Assistant for 2 years: Monitoring SNRTP-CPCU-NC-DP-13- 074-75 / Safeguard Component A: Institutional Training for Safeguard IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 25,000.00 15,334.40 Completed 2018-01-15 2018-02-14 2018-03-17 2018-04-16 team(Logistic,Meal and Monitoring Residency), one training to be organized in at each PMU cluster. SNRTP-CPCU-NC-RFQ-12- Component A: Institutional Request for Single Stage - One 074-75 / Bio- engineering IDA / 53360 Strengthening, T.A., and Post Limited 25,000.00 20,938.54 Completed 2018-05-14 2018-06-19 2018-08-18 Quotations Envelope Training to District Team Monitoring SNRTP-CPCU-NC-DP-12- Component A: Institutional 074-75 / Soil/bio IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 29,000.00 0.00 Canceled 2018-01-15 2018-02-14 2018-04-01 2018-05-31 Engineering Training to Monitoring District Team SNRTP-CPCU-NCS-RFB-70- Component A: Institutional Single Stage - One 07 / VCDP and GAP IDA / H8990 Strengthening, T.A., and Post Request for Bids Open - National 300,000.00 0.00 Canceled 2018-05-11 2018-05-18 2018-06-17 2018-07-02 2018-07-16 2019-03-18 Envelope training for Eastern Cluster Monitoring SNRTP-CPCU-NCS-IFB-71- Component A: Institutional 074-75 / VCDP and GAP Single Stage - One IDA / 53360 Strengthening, T.A., and Post Request for Bids Open - National 300,000.00 0.00 Canceled 2018-05-11 2018-05-18 2018-06-17 2018-07-02 2018-07-16 2019-03-18 Training for western Envelope Monitoring Cluster SNRTP-CPCU-NCS-RFB-70- Component A: Institutional Single Stage - One 07-2 / VCDP and GAP IDA / H8990 Strengthening, T.A., and Post Request for Bids Open - National 300,000.00 147,623.96 Signed 2018-10-12 2018-10-19 2018-11-18 2018-12-03 2018-12-17 2019-07-15 Envelope training for Eastern Cluster Monitoring SNRTP-CPCU-NCS-IFB-71- Component A: Institutional 074-75-2 / VCDP and GAP Single Stage - One IDA / 53360 Strengthening, T.A., and Post Request for Bids Open - National 300,000.00 167,982.12 Signed 2018-10-12 2018-10-19 2018-11-18 2018-12-03 2018-12-17 2019-07-15 Training for western Envelope Monitoring Cluster CONSULTING FIRMS Activity Reference No. / Short List and Draft Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Request for Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Request for Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Interest Notice Proposals as Issued Proposals / Minutes Technical Proposal Proposals Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SNRTP-CPCU-CS-CQS-36- 074-75 / Procurement of Component A: Institutional Consultant Consulting Firm for Market IDA / H8990 Strengthening, T.A., and Post Qualification Open - National 250,000.00 0.00 Canceled 2018-06-28 2018-07-13 2018-08-27 2018-09-11 2018-10-03 2019-04-01 infrastructure investment Monitoring Selection study SNRTP-CPCU-CS-QCBS-47- Component A: Institutional Quality And 074-75 / Procurement of IDA / H8990 Strengthening, T.A., and Prior Cost-Based Open - National 560,000.00 0.00 Canceled 2017-12-03 2017-12-18 2018-02-01 2018-03-03 2018-03-18 2018-04-16 2018-05-08 2019-11-09 NGO for Beneficiary Monitoring Selection Monitoring for PMU West SNRTP-CPCU-CS-QCBS-46- Component A: Institutional Quality And 074-75 / Procurement of IDA / H8990 Strengthening, T.A., and Prior Cost-Based Open - National 520,000.00 0.00 Canceled 2017-12-03 2017-12-18 2018-02-01 2018-03-03 2018-03-18 2018-04-17 2018-05-09 2019-11-10 NGO for Beneficiary Monitoring Selection Monitoring for PMU East SNRTP-CPCU-CS-QCBS-48- Component A: Institutional Quality And 074-75 / Procurement of IDA / H8990 Strengthening, T.A., and Post Cost-Based Open - National 295,000.00 0.00 Canceled 2018-08-24 2018-08-27 2018-09-20 2018-10-21 2018-11-04 2018-11-14 2018-12-06 2019-07-14 NGO for Beneficiary Monitoring Selection Monitoring for PMU West SNRTP-CPCU-CS-QCBS-49- Component A: Institutional Quality And 074-75 / Procurement of IDA / H8990 Strengthening, T.A., and Post Cost-Based Open - National 295,000.00 0.00 Canceled 2018-08-24 2018-08-27 2018-09-20 2018-10-21 2018-11-04 2018-11-14 2018-12-06 2019-07-14 NGO for Beneficiary Monitoring Selection Monitoring for PMU East Page 11 SNRTP-CPCU-CS-CQS-35- Component A: Institutional Consultant 074-75 / Procurement of IDA / H8990 Strengthening, T.A., and Post Qualification Open - National 240,000.00 0.00 Canceled 2017-11-30 2017-12-15 2018-01-29 2018-02-13 2018-03-07 2018-09-03 Consulting Firm for Monitoring Selection Baseline Study SNRTP-CPCU-CS-QCBS-50- Component A: Institutional Quality And 075/76 / Pocurement of Under IDA / 53360 Strengthening, T.A., and Post Cost-Based Open - National 295,000.00 0.00 2018-09-17 2018-09-21 2018-10-15 2018-11-15 2018-11-29 2018-12-11 2019-01-02 2019-07-16 Consulting firm for Impact Implementation Monitoring Selection Study SNRTP-CPCU-CS-CQS-37- 075-76 / Hiring of Component A: Institutional Consultant Under Consulting Firm for IDA / H8990 Strengthening, T.A., and Post Qualification Open - National 16,000.00 0.00 2019-07-14 2019-07-28 2019-08-03 2019-08-31 2019-09-17 2020-01-15 Implementation Beneficiary Engagement Monitoring Selection Study INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SNRTP-CPCU-S-IC-25-070- 71 / Consulting Services for Component A: Institutional Providing Technical Support IDA / 53360 Strengthening, T.A., and Prior Direct Selection Direct 0.00 7,400,265.00 Signed to Routine Maintenance Monitoring System of Rural Roads and Bridges SNRTP-CPCU-S-SSS-28 / Component A: Institutional Individual Hiriing of Procurement IDA / 53360 Strengthening, T.A., and Prior Consultant Open 16,500.00 16,312.70 Signed Management Expert Monitoring Selection SNRTP-CPCU-CS-IND-73- 074-75 / Procurement of Component A: Institutional Individual Environmental Safeguard IDA / H8990 Strengthening, T.A., and Post Consultant Open 8,500.00 4,118.47 Signed 2017-12-03 2018-01-21 2018-02-05 2018-02-27 2018-04-28 Expert for Environmental Monitoring Selection Safeguard Audit SNRTP-CPCU-CS-IND-74- Component A: Institutional Individual 074-75 / Procurement of IDA / H8990 Strengthening, T.A., and Post Consultant Open 8,500.00 6,533.81 Completed 2017-12-03 2018-01-21 2018-02-05 2018-02-27 2018-04-28 Socail Safeguard Expert for Monitoring Selection Social Safeguard Audit SNRTP-CPCU-S-SSS-75- Component A: Institutional 074-75 / Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 12,600.00 12,433.72 Completed 2017-12-20 2017-12-30 2018-01-20 2018-07-19 Development Expert for 6 Monitoring months SNRTP-CPCU-S-SSS-74- Component A: Institutional 074-75 / Environment IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 12,600.00 12,433.72 Completed 2017-12-20 2017-12-30 2018-01-20 2018-07-19 Management Expert for 6 Monitoring months SNRTP-CPCU-S-IC-61-074- Component A: Institutional Individual 75 / Procurement IDA / H8990 Strengthening, T.A., and Prior Consultant Open 15,000.00 15,840.78 Signed 2017-11-20 2018-01-03 2018-01-24 2018-02-15 2019-08-09 Management Expert For Monitoring Selection intermittent input of 6 Month. SNRTP-CPCU-S-IC-67-074- 75 / Hiring of Inspector of Component A: Institutional Individual Works for Project IDA / H8990 Strengthening, T.A., and Post Consultant Open 520,000.00 0.00 Canceled 2017-11-26 2018-01-15 2018-01-20 2018-01-30 2019-08-03 Districts for 2 years (40 Monitoring Selection Nos) SNRTP-CPCU-CS-IND-77/1- 8-074-75 / Procurement of Component A: Institutional Individual 8 (Eight) Project Support IDA / 53360 Strengthening, T.A., and Post Consultant Open 130,000.00 70,804.52 Signed 2018-04-24 2018-05-28 2018-06-04 2018-06-18 2019-07-15 Engineers for 14 months Monitoring Selection input 1 each at individual district. SNRTP-CPCU-IND-75/1-5- 074-75 / Procurement of Component A: Institutional Individual Social Safeguard Consultant IDA / 53360 Strengthening, T.A., and Post Consultant Open 53,000.00 33,543.22 Signed 2018-04-24 2018-05-28 2018-06-04 2018-06-18 2019-07-15 SSC 5 numbers for 14 Monitoring Selection months 1-1 each at districts SNRTP-CPCU-CS-IND-76/1- 2-074-75 / Procurement of Component A: Institutional Individual 2 (Two) Environment IDA / 53360 Strengthening, T.A., and Post Consultant Open 22,000.00 7,418.21 Signed 2018-04-24 2018-05-28 2018-06-04 2018-06-18 2019-07-15 safeguard Consultant for 14 Monitoring Selection months input 1-1 each at individual district. SNRTP-CPCU-CS-IND-78- 074-75 / Procurement of 1 Component A: Institutional Individual (one) Bridge Design IDA / 53360 Strengthening, T.A., and Post Consultant Open 30,000.00 18,389.23 Signed 2018-04-24 2018-05-28 2018-06-04 2018-06-18 2019-07-15 Consultant at CPCU for 14 Monitoring Selection months. SNRTP-PMU-CS-IND-79- Component A: Institutional Individual 074-75 / Procurement of IDA / 53360 Strengthening, T.A., and Post Consultant Open 28,000.00 18,160.98 Signed 2018-04-24 2018-05-28 2018-06-04 2018-06-18 2019-07-15 Quality Monitoring Monitoring Selection Specialist for 14 months at PMU SNRTP-CPCU-CS-IND-80- Component A: Institutional Individual 074-75 / Procurement of IDA / 53360 Strengthening, T.A., and Post Consultant Open 36,000.00 24,174.94 Signed 2018-04-24 2018-05-28 2018-06-04 2018-06-18 2019-07-15 Quality Management Expert Monitoring Selection at CPCU for 14 months SNRTP-CPCU-S-IC-65-074- Component A: Institutional Individual 75 / Social Safeguard IDA / H8990 Strengthening, T.A., and Post Consultant Open 36,000.00 0.00 Canceled 2018-04-26 2018-05-28 2018-06-04 2018-06-18 2019-07-15 Expert for 14 months Monitoring Selection regular input at CPCU Page 12 SNRTP-CPCU-S-IC-64-074- Component A: Institutional Individual 75 / Environmental IDA / H8990 Strengthening, T.A., and Post Consultant Open 36,000.00 23,594.39 Signed 2018-04-26 2018-05-28 2018-06-04 2018-06-18 2019-07-15 Safeguard Expert for 14 Monitoring Selection months regular input at CPCU SNRTP-CPCU-S-SSS-61- 074-75 / Hiring Softwel Component A: Institutional Pvt. Ltd., New Baneshwor Under IDA / 53360 Strengthening, T.A., and Post Direct Selection Direct 14,000.00 0.00 2018-05-16 2018-05-26 2018-07-01 2019-07-01 for upgraing and system Implementation Monitoring support services for RuTIMS software. SNRTP-CPCU-CS-SSS-81- 075/76 / Hiring Mr. Component A: Institutional Individual Jamuna Bahadur Shrestha IDA / 53360 Strengthening, T.A., and Post Consultant Direct 17,000.00 12,921.09 Signed 2018-10-22 2018-11-01 2018-11-22 2018-12-27 2019-06-25 as Procurement Monitoring Selection Management Expert for Six months regular input. SNRTP-CPCU-CS-IND-81- Component A: Institutional Individual 075/76 / Procurement of IDA / 53360 Strengthening, T.A., and Post Consultant Limited 21,000.00 17,739.21 Signed 2018-09-25 2018-09-30 2018-10-14 2018-11-05 2019-07-16 Social Development Expert Monitoring Selection SNRTP-CPCU-S-SSS-77- Component A: Institutional 075-76 / Hiring IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 11,000.00 16,481.04 Signed 2018-12-16 2018-12-26 2019-01-16 2019-07-15 Environment Specialist for Monitoring PMU, East for 6 months SNRTP-CPCU-CS-SSS-78- Component A: Institutional 075-76 / Hiring of Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 11,000.00 0.00 Canceled 2018-12-16 2018-12-26 2019-01-16 2019-07-15 Development Expert for Monitoring PMU West for 6 months SNRTP-CPCU-CS-SSS-78- Component A: Institutional 075-76 -2 / Hiring of Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 11,000.00 9,119.51 Signed 2018-12-25 2018-12-31 2019-01-16 2019-07-15 Development Specialist at Monitoring PMU for Six months. SNRTP-CPCU-S-IC-66-074- 75 / Procurement and Component A: Institutional Individual Contract Management IDA / H8990 Strengthening, T.A., and Prior Consultant Open 30,000.00 0.00 Canceled 2018-02-01 2018-02-26 2018-03-03 2018-03-13 2019-03-08 Specialist for 1.5 years at Monitoring Selection cluster PMU 2: SNRTP-CPCU-S-IC-63-074- Component A: Institutional Individual 75 / Environmental IDA / H8990 Strengthening, T.A., and Post Consultant Open 30,000.00 0.00 Canceled 2017-11-26 2018-01-15 2018-01-20 2018-02-10 2019-08-14 Safeguard Specialist for Monitoring Selection 1.5 years regular input at CPCU SNRTP-CPCU-S-SSS-76- Component A: Institutional 074-75 / Procurement of an IDA / H8990 Strengthening, T.A., and Prior Direct Selection Direct 27,000.00 0.00 Canceled 2017-12-20 2017-12-30 2018-02-20 2019-07-05 Independent Procurement Monitoring Specialist (IPS) SNRTP-CPCU-CS-SSS-82-1- SSC-075-76 / Hiring of Component A: Institutional Mr.Bipul Pokharel as Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 7,500.00 5,858.75 Signed 2019-02-24 2019-02-27 2019-03-14 2019-09-10 Safeguard Consultant for Monitoring 6 months. SNRTP-CPCU-CS-SSS-82-2- SSC-075-76 / Hiring of Ms. Component A: Institutional Sirjana Rijal as Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 7,500.00 5,858.75 Signed 2019-02-24 2019-03-02 2019-03-23 2019-09-19 Safeguard Consultant for 6 Monitoring months. SNRTP-CPCU-CS-SSS-82-3- SSC-075-76 / Hiring of Mr. Component A: Institutional Diganta Adhikari as Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 7,500.00 5,858.75 Signed 2019-02-24 2019-02-27 2019-03-14 2019-09-10 Safeguard Consultant for 6 Monitoring months. SNRTP-CPCU-CS-SSS-82-4- SSC-075-76 / Hiring of Mr. Component A: Institutional Santosh Bhandari as Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 7,500.00 5,858.75 Signed 2019-02-24 2019-03-02 2019-03-23 2019-09-19 Safeguard Consultant for 6 Monitoring months. SNRTP-CPCU-CS-SSS-82-5- SSC-075-76 / Hiring of Mr. Component A: Institutional Gopal Basel as Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 7,500.00 5,858.75 Signed 2019-02-24 2019-02-27 2019-03-14 2019-09-10 Safeguard Consultant for 6 Monitoring months. SNRTP-CPCU-CS-SSS-82-6- SSC-075-76 / Hiring of Ms. Component A: Institutional Laxmi Pokhrel as Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 7,500.00 5,858.75 Signed 2019-02-24 2019-02-27 2019-03-14 2019-09-10 Safeguard Consultant for 6 Monitoring months. SNRTP-CPCU-CS-SSS-82-7- SSC-075-76 / Hiring of Mr. Component A: Institutional Krishna Prasad Adhikari IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 7,500.00 5,858.75 Signed 2019-02-24 2019-02-27 2019-03-14 2019-09-10 as Social Safeguard Monitoring Consultant for 6 months. SNRTP-CPCU-CS-SSS-82-8- SSC-075-76 / Hiring of Mr. Component A: Institutional Dinesh Khanal as Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 7,500.00 5,858.75 Signed 2019-02-24 2019-02-28 2019-03-16 2019-09-12 Safeguard Consultant for 6 Monitoring months SNRTP-CPCU-CS-SSS-82-9- SSC-075-76 / Hiring of Mr. Component A: Institutional Yam Lal Khatri as Social IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 7,500.00 5,858.75 Signed 2019-02-24 2019-03-02 2019-03-23 2019-09-19 Safeguard Consultant for 6 Monitoring months Page 13 SNRTP-CPCU-CS-SSS-82- 10-SSC-075-76 / Hiring of Component A: Institutional Mr. Subarna Chand as IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 7,500.00 5,858.75 Signed 2019-02-24 2019-03-02 2019-03-23 2019-09-19 Social Safeguard Consultant Monitoring for 6 months SNRTP-CPCU-CS-SSS-82- 11-SSC-075-76 / Hiring of Component A: Institutional Under Mr. Hark Singh Dhami as IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 7,500.00 5,835.86 2019-02-24 2019-02-27 2019-03-14 2019-09-10 Implementation Social Safeguard Consultant Monitoring for 6 months SNRTP-CPCU-CS-SSS-83- 075-76 / Hiring of Aviyaan Component A: Institutional Consulting (p) Ltd. for GIS IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 13,000.00 0.00 Canceled 2019-04-22 2019-04-25 2019-05-16 2019-09-13 based Road Accessibility Monitoring study of SNRTP project . SNRTP-CPCU-CS-SSS-84- 075-76 / Hiring of Aviyaan Component A: Institutional Consulting (p) Ltd. for IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 9,000.00 0.00 Canceled 2019-04-22 2019-04-25 2019-05-16 2019-09-13 Road Condition Survey of Monitoring SNRTP Roads SNRTP-CPCU-CS-SSS-85-1- PSE-075-76 / Hiring of Mr. Component A: Institutional Individual Under Sulav Nepal as Project IDA / H8990 Strengthening, T.A., and Post Consultant Direct 7,000.00 0.00 2019-04-22 2019-04-25 2019-05-02 2019-05-16 2019-11-17 Implementation Support Engineer-1 for 6 Monitoring Selection months. SNRTP-CPCU-CS-SSS-85-2- PSE-075-76 / Hiring of Component A: Institutional Individual Under Dinesh Prasad Mandal as IDA / H8990 Strengthening, T.A., and Post Consultant Direct 7,000.00 0.00 2019-04-22 2019-04-25 2019-05-02 2019-05-16 2019-11-17 Implementation Project Support Engineer Monitoring Selection for 6 months SNRTP-CPCU-CS-SSS-86- PMQME-075-76 / Hiring of Component A: Institutional Individual Mr. Sujit Dhital as Project Under IDA / H8990 Strengthening, T.A., and Post Consultant Direct 18,000.00 0.00 2019-04-22 2019-04-25 2019-05-02 2019-05-16 2019-11-17 Management and Quality Implementation Monitoring Selection Monitoring Expert for 6 months SNRTP-CPCU-CS-SSS-85-3- PSE-075-76 / Hiring of Mr. Component A: Institutional Individual Under Prabin Basnet as Project IDA / H8990 Strengthening, T.A., and Post Consultant Direct 7,000.00 0.00 2019-04-22 2019-04-25 2019-05-02 2019-05-16 2019-11-17 Implementation Support Engineer (PSE I) Monitoring Selection for 6 months SNRTP-CPCU-CS-SSS-87- 075-76 / Hiring of Aviyaan Component A: Institutional Consulting (p) Ltd. for GIS IDA / H8990 Strengthening, T.A., and Post Direct Selection Direct 15,000.00 0.00 Under Review 2019-05-06 2019-05-09 2019-05-30 2020-01-15 based Road Accessibility Monitoring study and Road Condition Survey of SNRTP project CPCU-CS-IND-SDS-87-075- Component A: Institutional Individual 76 / Procurement of Social Under IDA / 53360 Strengthening, T.A., and Post Consultant Limited 11,000.00 0.00 2019-07-14 2019-07-17 2019-07-31 2019-08-22 2019-12-31 Development Specialist for Implementation Monitoring Selection PMU SNRTP-CPCU-CS-SSS-88-1- Component A: Institutional Individual PSE-075-76 / Hiring of Under IDA / H8990 Strengthening, T.A., and Post Consultant Direct 7,000.00 0.00 2019-07-14 2019-07-17 2019-07-24 2019-08-07 2019-12-31 Dilip Upreti as Project Implementation Monitoring Selection Support Engineer I SNRTP-CPCU-CS-SSS-88-2- Component A: Institutional Individual PSE-075-76 / Hiring of Under IDA / H8990 Strengthening, T.A., and Post Consultant Direct 7,000.00 0.00 2019-07-14 2019-07-17 2019-07-24 2019-08-07 2019-12-31 Surendra Poudel as Project Implementation Monitoring Selection Support Engineer- I Page 14