FINAL DRAFT Procurement Plan (PP) for Works Proposed for the Fiscal Year (2013/14) Project Name : Nepal Health Sector Programme - II (NHSP II) Credit / Grant No: 4707 -NP / H557-NP hide hide hide September 19, 2013 WB's NOL to Award Prior / Post Review Public Opening of Recommendation Center or district Contract Signing Proc. Procedure: Bid Document to Recomm. To WB WB's NOL to Bid IA* (DUDBC Div Procurement at Completion of BER & Award Bid Invitation GON of WB ? Procurement Document Method of PP Status DIV Code Remarks Contract Office) Group Bids Contract ID No. (NSHP-DIVNAME- WB ID SN ID/SN Description of Works BASEYEAR-ID) 0 1 2 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17 1 360 H_Post 3 Ilam 0360 Hangpang Health Post (Birthing Centre is already NHSP-Ilam-2070/071-360 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District constructed, design the HP integrating the existing BC), Taplejung 2 361 CEOC 3 Ilam 0361 CEOC in District Hospital Building, Taplejung NHSP-Ilam-2070/071-361 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 3 362 DrQtr 3 Ilam 0362 Two Family Dr. Quarter Construction, Panchthar District NHSP-Ilam-2070/071-362 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Hospital 4 363 StaffQtr 3 Ilam 0363 4 Family Staff Quarter Bldg. Construction, Panchthar NHSP-Ilam-2070/071-363 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District District Hospital 5 364 Pub_HO 3 Ilam 0364 Public Health Office Bldg. Construction, Ilam NHSP-Ilam-2070/071-364 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 6 365 StaffQtr 3 Ilam 0365 Four Family Staff quarter in Ilam District Hospital NHSP-Ilam-2070/071-365 Post P NCB GON NA District 7 366 H_Post 3 Ilam 0366 Soyang HP Bldg. Construction, Ilam NHSP-Ilam-2070/071-366 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 8 367 H_Post 3 Ilam 0367 Chulachuli HP Bldg. Construction, Ilam NHSP-Ilam-2070/071-367 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 9 368 H_Post 3 Ilam 0368 Ivang HP Bldg. Construction , Ilam NHSP-Ilam-2070/071-368 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 10 369 StaffQtr 3 Ilam 0369 2 Family Staff Qtr Bldg. Construction in Chandragadhi NHSP-Ilam-2070/071-369 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District HP, Jhapa 11 370 H_Post 3 Ilam 0370 Jyamirgadhi HP, Jhapa NHSP-Ilam-2070/071-370 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 12 371 H_Post 3 Ilam 0371 Shantinagar HP, Jhapa NHSP-Ilam-2070/071-371 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 13 372 BEOC 3 Ilam 0372 BEOC building construction in Dhulabari PHCC, Jhapa NHSP-Ilam-2070/071-372 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 14 373 Pri_HC 3 Ilam 0373 Pathamari HP, Jhapa NHSP-Ilam-2070/071-373 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 15 374 H_Post 3 Ilam 0374 Kechana Health Post, Jhapa NHSP-Ilam-2070/071-374 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 16 375 DrQtr 3 Ilam 0375 2 Family Dr. Qtr Bldg. Construction in Surunga PHCC, NHSP-Ilam-2070/071-375 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Jhapa 17 533 StaffQtr 5 Morang 0533 4 Family Staff Qtr Bldg. Construction in Sattarjhora NHSP-Morang-2070/071-533 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District PHCC, Sunsari 18 534 Pri_HC 5 Morang 0534 Jhurkiya PHCC, Morang NHSP-Morang-2070/071-534 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 19 535 H_Post 5 Morang 0535 Chimadi HP construction, Sunsari NHSP-Morang-2070/071-535 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 20 756 H_Post 7 Dhankuta 0756 Madi Mulkharka HP Bldg. Construction, Sankhuwasava NHSP-Dhankuta-2070/071-756 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 21 757 H_Post 7 Dhankuta 0757 Fakchamara HP Bldg. Construction, Terhathum NHSP-Dhankuta-2070/071-757 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 22 758 H_Post 7 Dhankuta 0758 Isubu HP Bldg. Construction, Terhathum NHSP-Dhankuta-2070/071-758 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 23 759 H_Post 7 Dhankuta 0759 Nepaldanda HP Bldg. Construction, Bhojpur NHSP-Dhankuta-2070/071-759 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 24 760 StaffQtr 7 Dhankuta 0760 Regional Director's quarter in Regional Health NHSP-Dhankuta-2070/071-760 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District Directorate, Dhankuta 25 761 RDQtr 7 Dhankuta 0761 Danda Bazaar PHCC, 4 family staff quarter NHSP-Dhankuta-2070/071-761 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Construction, Dhankuta 26 762 Hos_New 7 Dhankuta 7437 District Hospital Bldg. Construction, Darchula NHSP-Dhankuta-2070/071-7437 Prior P ICB WB 1/2/2014 1/3/2014 6/3/2014 5/6/2014 30/06/2014 15/07/2014 14/08/2014 1/9/2017 District 27 1239 Pub_HO 12 Okhaldhunga 1239 Public Health Office Bldg. Construction, Solukhumbu NHSP-Okhaldhunga-2070/071- Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 1239 28 1240 Pub_HO 12 Okhaldhunga 1240 Public Health Office Bldg. Construction, Okhaldhunga NHSP-Okhaldhunga-2070/071- Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 1240 29 1241 HP_2mat 12 Okhaldhunga 1241 Birthing Center Bldg. Construction in Garma HP, NHSP-Okhaldhunga-2070/071- Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Solukhumbu 1241 30 1242 H_Post 12 Okhaldhunga 1242 Lokhim HP Bldg. Construction, Solukhumbu NHSP-Okhaldhunga-2070/071- Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 1242 31 1243 DrQtr 12 Okhaldhunga 1243 2 Family Dr. Quarter Bldg. Construction in Solukhumbu NHSP-Okhaldhunga-2070/071- Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Hospital, Solukhumbu 1243 32 1244 H_Post 12 Okhaldhunga 1244 Rampur HP Bldg. construction, Okhaldhunga NHSP-Okhaldhunga-2070/071- Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 1244 33 1245 H_Post 12 Okhaldhunga 1245 Ratamate HP Bldg. construction, Okhaldhunga NHSP-Okhaldhunga-2070/071- Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 1245 34 1246 H_Post 12 Okhaldhunga 1246 Rabadolu HP Bldg. construction, Okhaldhunga NHSP-Okhaldhunga-2070/071- Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 1246 35 1561 H_Post 15 Saptari 1561 Hardeni HP Bldg. construction, Udaypur NHSP-Saptari-2070/071-1561 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 36 1562 H_Post 15 Saptari 1562 Nametar HP Bldg. construction, Udaypur NHSP-Saptari-2070/071-1562 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 37 1563 H_Post 15 Saptari 1563 Rampur HP Bldg. construction (Birthing Centre is NHSP-Saptari-2070/071-1563 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District already constructed, design the HP integrating the existing BC in the new HP) Udaypur 38 1564 DrQtr 15 Saptari 1564 2 Family Dr. Quarter Bldg. Construction in Solukhumby NHSP-Saptari-2070/071-1564 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Hospital, Solukhumbu 39 1565 H_Post 15 Saptari 1565 Hakpara HP Bldg. Construction, Siraha NHSP-Saptari-2070/071-1565 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 40 1566 StaffQtr 15 Saptari 1565 4 Family Staff Qtr Bldg. Construction in Siraha Hospital, NHSP-Saptari-2070/071-1565 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Siraha Page 1 of 5 FINAL DRAFT WB's NOL to Award Prior / Post Review Public Opening of Recommendation Center or district Contract Signing Proc. Procedure: Bid Document to Recomm. To WB WB's NOL to Bid IA* (DUDBC Div Procurement at Completion of BER & Award Bid Invitation GON of WB ? Procurement Document Method of PP Status DIV Code Remarks Contract Office) Group Bids Contract ID No. (NSHP-DIVNAME- WB ID SN ID/SN Description of Works BASEYEAR-ID) 0 1 2 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17 41 1567 MSQtr 15 Saptari 1566 Medical superintendent Qtr Bldg. Construction in Siraha NHSP-Saptari-2070/071-1566 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Hospital, Siraha 42 1568 P_Mortem 15 Saptari 1567 Post mortem building In Siraha Hospital NHSP-Saptari-2070/071-1567 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2015 District 43 1759 StaffQtr 17 Dhanusha 1759 4 Family Staff Qtr Bldg. Construction in Jaleswor NHSP-Dhanusha-2070/071-1759 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Hospital, Mahottari 44 1760 StaffQtr 17 Dhanusha 1760 4 Family Staff Qtr Bldg. Construction in Pipra, Mahottari NHSP-Dhanusha-2070/071-1760 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 45 1761 StaffQtr 17 Dhanusha 1761 2 Family Dr. Qtr Bldg. Construction in Pipra, Mahottari NHSP-Dhanusha-2070/071-1761 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 46 1762 MSQtr 17 Dhanusha 1762 Medical superintendent Qtr Bldg. Construction in NHSP-Dhanusha-2070/071-1762 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Mahottari Hospital, Mahottari 47 1763 H_Post 17 Dhanusha 1763 Manara HP Bldg. Construction, Mahottari NHSP-Dhanusha-2070/071-1763 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 48 1764 HP_2mat 17 Dhanusha 1764 Birthing Center in Balawa health Post, Mahottari NHSP-Dhanusha-2070/071-1764 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2015 District 49 1765 HP_2mat 17 Dhanusha 1765 Birthing Center in Mahdaiya Tapanpur Heath Post, NHSP-Dhanusha-2070/071-1765 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2015 District Mahottari 50 1766 HP_2mat 17 Dhanusha 1766 Birthing Center in Simardahi health Post, Mahottari NHSP-Dhanusha-2070/071-1766 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2015 District 51 1767 P_Mortem 17 Dhanusha 1767 Post Mortem House in Gaushala PHCC, Mahottari NHSP-Dhanusha-2070/071-1767 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2015 District 52 1768 H_Post 17 Dhanusha 1768 Manpur HP Bldg. Construction, Sarlahi NHSP-Dhanusha-2070/071-1768 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 53 1769 H_Post 17 Dhanusha 1769 Batraul HP Bldg. Construction, Sarlahi NHSP-Dhanusha-2070/071-1769 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 54 1770 H_Post 17 Dhanusha 1770 Harsahi HP Bldg. Construction, Sindhuli NHSP-Dhanusha-2070/071-1770 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 55 1771 HP_2mat 17 Dhanusha 1771 Two Family Dr. Quarter Construction, Sindhuli District NHSP-Dhanusha-2070/071-1771 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District hospital, Sindhuli 56 1772 StaffQtr 17 Dhanusha 1772 Four Family Staff Quarter Construction, Sindhuli District NHSP-Dhanusha-2070/071-1772 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District hospital, Sindhuli 57 2467 H_Post 24 Kavre 2467 Ghunsi Health Post, Ramechap NHSP-Kavre-2070/071-2467 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 58 2468 H_Post 24 Kavre 2468 Gupteswor Health Post, Ramechap NHSP-Kavre-2070/071-2468 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 59 2469 H_Post 24 Kavre 2469 Sanghutar HP (Integrate the HP with already NHSP-Kavre-2070/071-2469 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District constructed birthing center), Ramechhap 60 2470 P_Mortem 24 Kavre 2470 Post Martum Bldg. Construction, Jiri Hospital, Dolakha NHSP-Kavre-2070/071-2470 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2015 District 61 2471 H_Post 24 Kavre 2471 Jugu Health post , Dolakha NHSP-Kavre-2070/071-2471 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 62 2472 H_Post 24 Kavre 2472 Sundarawati Health post , Dolakha NHSP-Kavre-2070/071-2472 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 63 2473 H_Post 24 Kavre 2473 Budhakhani HP, Kavre NHSP-Kavre-2070/071-2473 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 64 2474 H_Post 24 Kavre 2474 Dhunkharka HP, Kavre NHSP-Kavre-2070/071-2474 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 65 2475 HP_2mat 24 Kavre 2475 Birthing Center Bldg. Construction in Banskharka HP, NHSP-Kavre-2070/071-2475 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2015 District Sindhupalchok 66 2476 HP_2mat 24 Kavre 2476 Birthing Center Bldg. Construction in Vhimtar HP, NHSP-Kavre-2070/071-2476 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2015 District Sindhupalchok 67 2477 Pub_HO 24 Kavre 2477 DPHO building construction, Sindhupalchowk NHSP-Kavre-2070/071-2477 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 68 2478 H_Post 24 Kavre 2478 Kolati HP building Constrution, Kavre 69 2743 H_Post 27 Kathmandu 2743 Bhimdhunga HP Bldg. Construction, Kathmandu NHSP-Kathmandu-2070/071-2743 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 Central 70 2744 H_Post 27 Kathmandu 2744 Kapan HP Bldg. Construction, Kathmandu NHSP-Kathmandu-2070/071-2744 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 Central 71 2745 Pri_HC 27 Kathmandu 2745 Sangla PHCC Bldg. Construction (BEOC already NHSP-Kathmandu-2070/071-2745 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 Central planned last fiscal year integrate the design of PHCC with already planned BEOC), Kathmandu 72 2746 AnmQtr 27 Kathmandu 2746 2 Family ANM Qtr. Bldg. Construction, Ashrang HP NHSP-Kathmandu-2070/071-2746 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 Central Lalitpur 73 2747 H_Post 27 Kathmandu 2747 Gimdi HP Bldg. Construction, Lalitpur NHSP-Kathmandu-2070/071-2747 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 Central 74 2838 Hos_New 28 Nuwakot 2838 District Hospital Bldg. Construction, Rasuwa NHSP-Nuwakot-2070/071-2838 Prior P ICB WB 1/2/2014 1/3/2014 6/3/2014 5/6/2014 30/06/2014 15/07/2014 14/08/2014 1/9/2017 District 75 2839 H_Post 28 Nuwakot 2839 Goljung HP, Rasuwa NHSP-Nuwakot-2070/071-2839 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 76 2840 H_Post 28 Nuwakot 2839 Laherepauwa HP, Rasuwa NHSP-Nuwakot-2070/071-2839 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 77 2841 H_Post 28 Nuwakot 2840 Dhusha HP Bldg. Construction, Dhading NHSP-Nuwakot-2070/071-2840 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 78 2842 StaffQtr 28 Nuwakot 2841 2 Family Staff Qtr Bldg. Construction over existing NHSP-Nuwakot-2070/071-2841 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2015 District Gajuri PHCC building, Dhading 79 2843 H_Post 28 Nuwakot 2842 Chainpur (Salbas) HP, Dhading NHSP-Nuwakot-2070/071-2842 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 80 2844 H_Post 28 Nuwakot 2843 Phoolkharka HP, Dhading NHSP-Nuwakot-2070/071-2843 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 81 2845 H_Post 28 Nuwakot 2845 Kaule HP Bldg. Construction, Nuwakot NHSP-Nuwakot-2070/071-2845 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District Page 2 of 5 FINAL DRAFT WB's NOL to Award Prior / Post Review Public Opening of Recommendation Center or district Contract Signing Proc. Procedure: Bid Document to Recomm. To WB WB's NOL to Bid IA* (DUDBC Div Procurement at Completion of BER & Award Bid Invitation GON of WB ? Procurement Document Method of PP Status DIV Code Remarks Contract Office) Group Bids Contract ID No. (NSHP-DIVNAME- WB ID SN ID/SN Description of Works BASEYEAR-ID) 0 1 2 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17 82 2846 H_Post 28 Nuwakot 2846 Khadkabhanjyang HP Bldg. Construction, Nuwakot NHSP-Nuwakot-2070/071-2846 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 83 2847 H_Post 28 Nuwakot 2847 Samari HP Bldg. Construction, Nuwakot NHSP-Nuwakot-2070/071-2847 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 84 2848 H_Post 28 Nuwakot 2848 Kumaari HP Bldg. Construction, Nuwakot NHSP-Nuwakot-2070/071-2848 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 85 2849 H_Post 28 Nuwakot 2848 Samundratar Health Post, Nuwakot NHSP-Nuwakot-2070/071-2848 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 86 3110 Pub_HO 31 Training 3110 Public Health Office Bldg. Construction, Makawanpur NHSP-Training Center-2070/071- Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District Center 3110 87 3111 StaffQtr 31 Training 3111 4 Family Staff Qtr Bldg. Construction in Palung PHCC, NHSP-Training Center-2070/071- Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Center Makawanpur 3111 88 3112 OffBldg 31 Training 3112 Central Region Health Directorate Bldg. Construction, NHSP-Training Center-2070/071- Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District Center Makawanpur 3112 89 3113 H_Post 31 Training 3113 Hatiya (makawanpur Gadhi) HP Bldg. construction NHSP-Training Center-2070/071- Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District Center 3113 90 3456 PMH 34 Parsa 3456 Post Martum Bldg. Construction, Rautat Hospital, NHSP-Parsa-2070/071-3456 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2015 District Rautahat 91 3457 Pri_HC 34 Parsa 3457 Katahariya PHCC Bldg. Construction, Rautahat NHSP-Parsa-2070/071-3457 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 92 3458 DrQtr 34 Parsa 3458 4 Family Dr. Quarter Bldg. Construction in Kalaiya NHSP-Parsa-2070/071-3458 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Hospital, Bara 93 3459 StaffQtr 34 Parsa 3459 2 Family Staff Qtr Bldg. Construction in Nichuta HP, NHSP-Parsa-2070/071-3459 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Parsa 94 3460 H_Post 34 Parsa 3460 Patewa Sugauli HP, Parsa NHSP-Parsa-2070/071-3460 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 95 3461 H_Post 34 Parsa 3461 Shankar Sariya HP, Parsa NHSP-Parsa-2070/071-3461 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 96 3462 H_Post 34 Parsa 3462 Jingadwa belbichhawa HP, Rautahat NHSP-Parsa-2070/071-3462 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 97 3463 H_Post 34 Parsa 3463 Dharmapur HP, Rautahat NHSP-Parsa-2070/071-3463 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 98 3464 MSQtr 34 Parsa 3464 Medical Superintendent Quarter, Chandranigahpur NHSP-Parsa-2070/071-3464 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 99 3465 Mhall 34 Parsa 3465 Multipurpose Hall over BEOC building, NHSP-Parsa-2070/071-3465 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Chandranigahpur 100 3536 HP_2mat 35 Chitwan 3536 Construction of Birthing Center with Multipurpose Hall NHSP-Chitwan-2070/071-3536 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District on at Meghauli HP, Chitwan 101 3537 DrQtr 35 Chitwan 3537 2 Family Dr. Quarter Bldg. Construction Ratnanagar, NHSP-Chitwan-2070/071-3537 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Hospital, Chitwan 102 3538 H_Post 35 Chitwan 3538 Jagatpur HP construction, Chitawan NHSP-Chitwan-2070/071-3538 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 103 3539 H_Post 35 Chitwan 3539 Dahakhani HP construction, Chitawan NHSP-Chitwan-2070/071-3539 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 104 3541 HP_2mat 35 Chitwan 3541 Birthing Center Bldg. Construction in Dumkibas HP, NHSP-Chitwan-2070/071-3541 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2015 District Nawalparasi 105 3542 Pri_HC 35 Chitwan 3542 Palhi PHCC Bldg. Construction, Nawalparasi NHSP-Chitwan-2070/071-3542 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 106 3656 H_Post 36 Gorkha 3656 Khoplang HP Bldg. Construction, Gorkha NHSP-Gorkha-2070/071-3656 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 107 3657 H_Post 36 Gorkha 3657 Borlang HP Bldg. Construction, Gorkha NHSP-Gorkha-2070/071-3657 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 108 3658 H_Post 36 Gorkha 3658 Thalajung HP Bldg. Construction, Gorkha NHSP-Gorkha-2070/071-3658 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 109 3659 Pstore 36 Gorkha 3659 Public Health Store in Gorkha NHSP-Gorkha-2070/071-3659 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2015 District 110 3660 Pub_HO 36 Gorkha 3660 Public Health Office with Medical Store Bldg. NHSP-Gorkha-2070/071-3660 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District (integrated) Construction, Manang 111 3661 H_Post 36 Gorkha 3661 Bhorletar HP construction, Lamjung NHSP-Gorkha-2070/071-3661 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 112 3662 H_Post 36 Gorkha 3662 Tarkughat HP construction, Lamjung NHSP-Gorkha-2070/071-3662 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 113 3663 H_Post 36 Gorkha 3663 Satiswara HP construction, Tanahun NHSP-Gorkha-2070/071-3663 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 114 4062 H_Post 40 Kaski 4062 Yeladi HP Bldg. Construction, Syangja NHSP-Kaski-2070/071-4062 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 115 4063 H_Post 40 Kaski 4063 Dhanubase HP Bldg. Construction, Syangja NHSP-Kaski-2070/071-4063 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 116 4064 H_Post 40 Kaski 4064 Arukharka HP Bldg. Construction, Syangja NHSP-Kaski-2070/071-4064 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 117 4065 H_Post 40 Kaski 4065 Keware HP Bldg. Construction, Syangja NHSP-Kaski-2070/071-4065 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 118 4066 P_Mortem 40 Kaski 4066 Post Mortem House in Waling PHCC, Syangja NHSP-Kaski-2070/071-4066 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2015 District 119 4067 H_Post 40 Kaski 4067 Salyan HP Bldg. Construction, Kaski NHSP-Kaski-2070/071-4067 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 120 4068 H_Post 40 Kaski 4068 Bahaki Thanti HP Bldg. Construction, Parbat NHSP-Kaski-2070/071-4068 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 121 4069 H_Post 40 Kaski 4069 Rupakot HP, Kaski NHSP-Kaski-2070/071-4069 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 122 4070 H_Post 40 Kaski 4070 Darsingh Dahathum HP Building constrcution, Syangja NHSP-Kaski-2070/071-4070 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 123 4547 H_Post 45 Baglung 4547 Batakachhaur HP Bldg. Construction, Baglung NHSP-Baglung-2070/071-4547 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 124 4548 H_Post 45 Baglung 4548 Gwalichhaur HP Bldg. Construction, Baglung NHSP-Baglung-2070/071-4548 Post P NA NA 125 4546 H_Post 45 Baglung 4549 Ramche HP Bldg. Construction, Myagdi NHSP-Baglung-2070/071-4549 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 126 4547 Pub_HO 45 Baglung 4550 Public Health Office with Medical store Bldg integrated NHSP-Baglung-2070/071-4550 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District Construction in Mustang 127 4746 H_Post 47 Palpa 4746 Birkot HP Bldg. Construction, Palpa NHSP-Palpa-2070/071-4746 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 128 4747 StaffQtr 47 Palpa 4747 4 Family Staff Qtr Bldg. Construction in Palpa Hospital, NHSP-Palpa-2070/071-4747 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Palpa 129 4748 StaffQtr 47 Palpa 4748 2 Family Dr. Qtr Bldg. Construction over the existing Dr. NHSP-Palpa-2070/071-4748 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Qtr building in Palpa Hospital, Palpa Page 3 of 5 FINAL DRAFT WB's NOL to Award Prior / Post Review Public Opening of Recommendation Center or district Contract Signing Proc. Procedure: Bid Document to Recomm. To WB WB's NOL to Bid IA* (DUDBC Div Procurement at Completion of BER & Award Bid Invitation GON of WB ? Procurement Document Method of PP Status DIV Code Remarks Contract Office) Group Bids Contract ID No. (NSHP-DIVNAME- WB ID SN ID/SN Description of Works BASEYEAR-ID) 0 1 2 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17 130 4749 StaffQtr 47 Palpa 4749 2 Family Dr. Qtr Bldg. Construction in Rampur Hospital, NHSP-Palpa-2070/071-4749 Post P NCB NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Palpa 131 4750 P_Mortem 47 Palpa 4750 Post mortem House construction in Palpa District NHSP-Palpa-2070/071-4750 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2015 District Hospital 132 4751 H_Post 47 Palpa 4751 Gadakot HP Bldg. construction, Palpa NHSP-Palpa-2070/071-4751 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 133 4752 H_Post 47 Palpa 4752 Bajhkoteri HP Bldg. Construction, Gulmi NHSP-Palpa-2070/071-4752 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 134 4753 H_Post 47 Palpa 4753 Hunga HP Bldg. Construction, Gulmi NHSP-Palpa-2070/071-4753 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 135 4754 StaffQtr 47 Palpa 4754 4 Family Staff Qtr Bldg. Construction in Dhurkot PHCC, NHSP-Palpa-2070/071-4754 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Gulmi 136 4750 H_Post 49 Rupandehi 4950 Semlar HP Bldg. Construction, Rupandehi NHSP-Rupandehi-2070/071-4950 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 137 4751 H_Post 49 Rupandehi 4951 Rohinihawa HP Bldg. Construction, Rupandehi NHSP-Rupandehi-2070/071-4951 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 138 4752 P_Mortem 49 Rupandehi 4952 Post Martum Bldg. Construction, Bhim Hospital, NHSP-Rupandehi-2070/071-4952 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2015 District Rupandehi 139 4753 H_Post 49 Rupandehi 4953 Kushawa HP Bldg. Construction, Kapilvastu NHSP-Rupandehi-2070/071-4953 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 140 4754 P_Mortem 49 Rupandehi 4954 Post mortem house in Pipara Hospital, Kapilvastu NHSP-Rupandehi-2070/071-4954 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2015 District 141 4755 H_Post 49 Rupandehi 4955 Barakulapur HP construction, Kapilvastu NHSP-Rupandehi-2070/071-4955 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 142 4756 HP_2mat 49 Rupandehi 4956 Narapani Health post Building, Arghakhanchi NHSP-Rupandehi-2070/071-4956 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 143 4757 P_Mortem 49 Rupandehi 4957 Postmortem House in Thada PHCC, Arghakhanchi NHSP-Rupandehi-2070/071-4957 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2015 District 144 4758 H_Post 49 Rupandehi 4958 Wagi HP building, Arghakhanchi NHSP-Rupandehi-2070/071-4958 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 145 4759 StaffQtr 49 Rupandehi 4959 2 Family Dr. Qtr Bldg. Construction in Pipra hospital, NHSP-Rupandehi-2070/071-4959 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Kapilvastu 146 4760 StaffQtr 49 Rupandehi 4960 4 Family Staff Qtr. Construction in Pipra hospital, NHSP-Rupandehi-2070/071-4960 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Kapilvastu 147 5351 DrQtr 53 Rolpa 5351 4 Family Dr. Quarter Bldg. Construction in District NHSP-Rolpa-2070/071-5351 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Hospital, Rolpa 148 5352 Hos_New 53 Rolpa 5352 District Hospital in Rolpa District NHSP-Rolpa-2070/071-5352 Prior P NCB GON 1/2/2014 1/3/2014 6/3/2014 5/6/2014 30/06/2014 15/07/2014 14/08/2014 1/9/2017 District 149 5353 H_Post 53 Rolpa 5353 Kotgaun HP Bldg. Construction, Rolpa NHSP-Rolpa-2070/071-5353 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 150 5354 H_Post 53 Rolpa 5354 Kariti HP building Construction in Rolpa NHSP-Rolpa-2070/071-5354 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 151 5355 H_Post 53 Rolpa 5355 Korchabang HP Bldg. Construction, Rolpa NHSP-Rolpa-2070/071-5355 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 152 5356 H_Post 53 Rolpa 5356 Ghartigaun HP building Construction in Rolpa NHSP-Rolpa-2070/071-5356 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 153 5357 HP_2mat 53 Rolpa 5357 Birthing Center Bldg. Construction in Dharmabati HP, NHSP-Rolpa-2070/071-5357 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2015 District Pyuthan 154 5358 StaffQtr 53 Rolpa 5358 Four family staff quarter in Bhingri PHCC, Pyuthan NHSP-Rolpa-2070/071-5358 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 155 5359 H_Post 53 Rolpa 5359 Khung HP, Pyuthan NHSP-Rolpa-2070/071-5359 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 156 5360 H_Post 53 Rolpa 5360 Baraula HP, Pyuthan NHSP-Rolpa-2070/071-5360 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 157 5361 H_Post 53 Rolpa 5361 Chunwang HP, Pyuthan NHSP-Rolpa-2070/071-5361 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 158 5362 H_Post 53 Rolpa 5362 Rukumkot HP, Pyuthan NHSP-Rolpa-2070/071-5362 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 159 5363 H_Post 53 Rolpa 5363 Selapakha HP, Pyuthan NHSP-Rolpa-2070/071-5363 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 160 5632 H_Post 56 Dang 5632 Ghanjari Pipal Health Post, Salayan NHSP-Dang-2070/071-5632 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 161 5633 StaffQtr 56 Dang 5633 4 family staff quarter building construction in Tharmare NHSP-Dang-2070/071-5633 Post P NCB NA NA PHCC, Salyan 162 5634 H_Post 56 Dang 5634 Gadhwa Health Post, Dang NHSP-Dang-2070/071-5634 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 163 5635 Training 56 Dang 5635 SBA Training Building in Rapti Sub Regional Hospital, NHSP-Dang-2070/071-5635 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District Dang 164 5636 Pstore 56 Dang 5636 Store Building for Public Health Office, Banke NHSP-Dang-2070/071-5636 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2015 District 165 5726 DrQtr 57 Banke 5726 2 Family Dr. Quarter Bldg. Construction in Khajura NHSP-Banke-2070/071-5726 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2015 District PHCC, Banke 166 5727 H_Post 57 Banke 5727 Titihiriya HP building construction, Banke NHSP-Banke-2070/071-5727 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 167 5729 H_Post 57 Banke 5729 Hirminiya HP building construction, Banke NHSP-Banke-2070/071-5729 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 168 5730 H_Post 57 Banke 5730 Khairapur HP building construction, Bardiya NHSP-Banke-2070/071-5730 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 169 5731 StaffQtr 57 Banke 5731 Four Family staff Quarter Bldg. Construction in Bardiya NHSP-Banke-2070/071-5731 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Hospital, Bardiya 170 5960 HP_2mat 59 Surkhet 5960 Construction of Birthing Center with ANM Qtr Bldg. on NHSP-Surkhet-2070/071-5960 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District top at Sanilekh HP, Surkhet 171 5961 StaffQtr 57 Surkhet 5960 Four Family staff Quarter Bldg. Construction in salkot NHSP-Surkhet-2070/071-5960 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District PHCC, Surkhet 172 H_Post Surkhet Gharanga HP, Jajarkot P NA NA 173 6376 StaffQtr 63 Jumla 6376 4 Family Staff Qtr Bldg. Construction in District Hospital, NHSP-Jumla-2070/071-6376 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2017 District Mugu Page 4 of 5 FINAL DRAFT WB's NOL to Award Prior / Post Review Public Opening of Recommendation Center or district Contract Signing Proc. Procedure: Bid Document to Recomm. To WB WB's NOL to Bid IA* (DUDBC Div Procurement at Completion of BER & Award Bid Invitation GON of WB ? Procurement Document Method of PP Status DIV Code Remarks Contract Office) Group Bids Contract ID No. (NSHP-DIVNAME- WB ID SN ID/SN Description of Works BASEYEAR-ID) 0 1 2 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17 174 6377 HP_2mat 64 Jumla 6377 Dhenkot HP, Mugu NHSP-Jumla-2070/071-6377 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2015 District 175 6378 PMH 65 Jumla 6378 Post Martum Bldg. Construction, Mugu Hospital, Mugu NHSP-Jumla-2070/071-6378 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2015 District 176 6379 H_Post 66 Jumla 6379 Lawan (Banthata) HP Bldg. Construction, Dolpa NHSP-Jumla-2070/071-6379 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2017 District 177 6380 H_Post 67 Jumla 6380 Sahartara (Gumbatara) HP Bldg. Construction, Dolpa NHSP-Jumla-2070/071-6380 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2017 District 178 6381 H_Post 68 Jumla 6381 Rodikot HP Bldg. Construction, Humla NHSP-Jumla-2070/071-6381 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2017 District 179 6382 H_Post 69 Jumla 6382 Mahila HP Building, Humla NHSP-Jumla-2070/071-6382 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2017 District 180 6383 OffBldg 70 Jumla 6383 DPHO building construction, Jumla NHSP-Jumla-2070/071-6383 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2017 District 181 6384 P_Mortem 71 Jumla 6384 Post Martum Bldg. Construction, Kalikot Hospital, NHSP-Jumla-2070/071-6384 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2015 District Kalikot 182 6385 StaffQtr 72 Jumla 6385 2 Family Dr. Quarter Construction, Kalikot Hospital, NHSP-Jumla-2070/071-6385 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Kalikot 183 6386 H_Post 73 Jumla 6386 Jubitha HP, Kalikot NHSP-Jumla-2070/071-6386 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2017 District 184 6387 H_Post 74 Jumla 6387 Tatopani HP, Jumla NHSP-Jumla-2070/071-6387 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2017 District 185 7066 Pub_HO 70 Doti 7066 Public Health Office Bldg. Construction, Doti NHSP-Doti-2070/071-7066 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 186 7067 StaffQtr 70 Doti 7067 Eight family staff quarter construction in Regional NHSP-Doti-2070/071-7067 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District Directorate, FW Regional Directorate, Doti 187 7067 H_Post 70 Doti 7068 Aatichaur HP construction integrating with the existing NHSP-Doti-2070/071-7068 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District birthing center, Bajura 188 7067 H_Post 70 Doti 7069 Toli HP construction, Bajura NHSP-Doti-2070/071-7069 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 189 7067 HP_2mat 70 Doti 7070 Construction of birthing Center with ANM quarter on top NHSP-Doti-2070/071-7070 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District in Debal Divyapur HP, Dadeldhura 190 7067 H_Post 70 Doti 7071 Two family quarter construction in Belapur HP, NHSP-Doti-2070/071-7071 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2015 District Dadeldhura 191 7067 H_Post 70 Doti 7072 HP building construction Kailpalmandu, Dadeldhura NHSP-Doti-2070/071-7072 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 192 7067 H_Post 70 Doti 7073 Turmakhand HP construction integrating with the NHSP-Doti-2070/071-7073 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District existing birthing center, Achham 193 7067 H_Post 70 Doti 7074 Construction of birthing Center in Shreekot HP, Achham NHSP-Doti-2070/071-7074 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 194 7067 H_Post 70 Doti 7075 Lamikhal HP building construction in Doti. NHSP-Doti-2070/071-7075 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 195 7133 H_Post 71 Kailali 7133 Shankarpur HP Bldg. Construction, Kanchanpur NHSP-Kailali-2070/071-7133 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 196 7134 H_Post 71 Kailali 7134 Hasuliya HP construction, Kailali NHSP-Kailali-2070/071-7134 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 197 7135 H_Post 71 Kailali 7135 Godavari HP construction, Kailali NHSP-Kailali-2070/071-7135 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 198 7136 H_Post 71 Kailali 7136 Masuriya HP construction, Kailali NHSP-Kailali-2070/071-7136 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 199 7137 StaffQtr 71 Kailali 7137 4 Family Staff Quarter in Joshipur PHCC, kailali NHSP-Kailali-2070/071-7137 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 200 7138 Training 71 Kailali 7138 Conference Hall in Regional training center Dhangadhi NHSP-Kailali-2070/071-7138 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2015 District 201 7139 StaffQtr 71 Kailali 7139 4 family Staff quarter and 2 family Dr. quarter in NHSP-Kailali-2070/071-7139 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District Dodhara Chandani PHCC, Kanchanpur 202 7140 H_Post 71 Kailali 7140 Chandani HP, Kanchanpur NHSP-Kailali-2070/071-7140 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 203 7141 H_Post 71 Kailali 7141 Parasan HP Kanchanpur NHSP-Kailali-2070/071-7141 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2016 District 204 7436 Pri_HC 74 Baitadi 7436 Deulekh PHCC Bldg. Construction, Bajhang NHSP-Baitadi-2070/071-7436 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/1/2017 District 205 7438 Pub_HO 74 Baitadi 7438 Public Health Office Bldg. Construction, Darchula NHSP-Baitadi-2070/071-7438 Post P NCB GON 206 7440 DrQtr 74 Baitadi 7440 2 Family Dr. Quarter Bldg. Construction in District NHSP-Baitadi-2070/071-7440 Post P NCB GON Hospital, Darchula NA NA 1/11/2013 1/2/2014 1/3/2014 15/03/2014 014/04/2014 1/1/2017 District Package in one 207 7441 StaffQtr 74 Baitadi 7441 4 Family Staff Quarter Bldg. Construction in District NHSP-Baitadi-2070/071-7441 Post P NCB GON Hospital, Darchula 208 7442 H_Post 74 Baitadi 7442 Ranishikhar HP Bldg. Construction, Darchula NHSP-Baitadi-2070/071-7442 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District 209 7443 Hos_New 74 Baitadi 7443 District Hospital Bldg. Construction, Baitadi NHSP-Baitadi-2070/071-7443 Prior P ICB WB 1/2/2014 1/3/2014 6/3/2014 5/6/2014 30/06/2014 15/07/2014 14/08/2014 1/9/2017 District 210 7444 P_Mortem 74 Baitadi 7444 Post mortem House in , Kesharpur PHCC, Baitadi NHSP-Baitadi-2070/071-7444 Post P NCB 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2015 District 211 7445 H_Post 74 Baitadi 7445 Shree Kedar HP Bldg. Construction, Baitadi NHSP-Baitadi-2070/071-7445 Post P NCB GON NA NA 1/11/2013 1/12/2013 NA NA 1/1/2014 1/6/2016 District Notes: A = Actual, P = Planned, R= Revised, A = Actual (Rows will be added for R and A as required) GON = Government of Nepal, NA = Not applicable, WB= World Bank ICB= International Competitive Bidding (for projects estimated above 1 million USD), NCB= National Competitive Bidding Cost Estimate may change based on the estimate prepared at the districts based on the site conditions, Calculation in 1 US $ = NRs.102 Prepared Date: 5 September, 2013 Page 5 of 5