The World Bank Report No: ISR6688 Implementation Status & Results Azerbaijan Water Users Association Development Support Project (P107617) Public Disclosure Copy Operation Name: Water Users Association Development Support Project Project Stage: Implementation Seq.No: 2 Status: ARCHIVED Archive Date: 21-Sep-2011 (P107617) Country: Azerbaijan Approval FY: 2011 Product Line: IBRD/IDA Region: EUROPE AND CENTRAL ASIA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Amelioration and Irrigation Open Joint Stock Company Key Dates Board Approval Date 26-Apr-2011 Original Closing Date 30-Jun-2016 Planned Mid Term Review Date 01-Jul-2014 Last Archived ISR Date 21-Sep-2011 Effectiveness Date 21-Dec-2011 Revised Closing Date 30-Jun-2016 Actual Mid Term Review Date Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objective is to improve the effectiveness and financial viability of on-farm irrigation water distribution and management in the Project area. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) Component Name Component Cost Component 1: Institutional Strengthening and Capacity Building 16.70 Component 2: On-farm Irrigation & Drainage Rehabilitation 89.90 Component 3: Project Management, and Monitoring & Evaluation 7.70 Overall Ratings Previous Rating Current Rating Public Disclosure Copy Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Low Low Implementation Status Overview The Project Implementation Unit (PIU) has started implementation of the project, recruited most of the PIU staff, contracted the design and construction supervision engineering consultants, and has started construction of rehabilitation works at three Water Users Associations and of the offices of the Regional Support Centers which will coordinate the project's activities in the regions. Page 1 of 6 The World Bank Report No: ISR6688 Locations Country First Administrative Division Location Planned Actual Azerbaijan Beylaqan Rayonu Beylaqan Rayonu ✔ Public Disclosure Copy Azerbaijan Salyan Rayonu Salyan Rayonu ✔ Azerbaijan Sabirabad Rayonu Sabirabad Rayonu ✔ Azerbaijan Saatli Rayonu Saatli Rayonu ✔ Azerbaijan Bilasuvar Rayonu Bilasuvar Rayonu ✔ Azerbaijan Neftcala Rayonu Neftcala Rayonu ✔ Azerbaijan Imisli Rayonu Imisli Rayonu ✔ Azerbaijan Agcabadi Rayonu Agcabadi Rayonu ✔ Azerbaijan Zardab Rayonu Zardab Rayonu ✔ Azerbaijan Zaqatala Rayonu Zaqatala Rayonu ✔ Azerbaijan Ucar Rayonu Ucar Rayonu ✔ Azerbaijan Samaxi Rayonu Samaxi Rayonu ✔ Azerbaijan Samkir Rayonu Samkir Rayonu ✔ Azerbaijan Kurdamir Rayonu Kurdamir Rayonu ✔ Azerbaijan Qabala Rayonu Qabala Rayonu ✔ Azerbaijan Qusar Rayonu Qusar Rayonu ✔ Azerbaijan Quba Rayonu Quba Rayonu ✔ Azerbaijan Xacmaz Rayonu Xacmaz Rayonu ✔ Public Disclosure Copy Azerbaijan Goranboy Rayonu Goranboy Rayonu ✔ Azerbaijan Qax Rayonu Qax Rayonu ✔ Azerbaijan Ismayilli Rayonu Ismayilli Rayonu ✔ Azerbaijan Goycay Rayonu Goycay Rayonu ✔ Azerbaijan Balakan Rayonu Balakan Rayonu ✔ Azerbaijan Barda Rayonu Barda Rayonu ✔ Page 2 of 6 The World Bank Report No: ISR6688 Country First Administrative Division Location Planned Actual Azerbaijan Agsu Rayonu Agsu Rayonu ✔ Public Disclosure Copy Azerbaijan Samux Rayonu Samux Rayonu ✔ Azerbaijan Haciqabul Rayonu Haciqabul Rayonu ✔ Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Indicator 1: Increase in agricultural productivity Hectare(Ha) Value 0.00 59200.00 (15%) in at least 80% of rehabilitated WUAs on Date 01-Sep-2011 30-Jun-2016 average and relative to non-rehabilitated Comments No M&E data on progress WUAsin irrigation seasonfollowing rehabilitation completion. yes, since project has just started implementation. The M&E framework will be updated following the updateto the baseline survey in summer 2012. Indicator 2: Rehabilitated WUAcollection rates Number Value 0.00 0.00 20.00 min 80% which meets 80% of required level of Date 01-Sep-2011 30-Jun-2016 on-farmsystem MOM two irrigation seasons Comments following rehabilitation completion. Indicator 3: Water distribution within 80% of the Number Value 0.00 0.00 30.00 rehabilitated systems closely matches the Date 01-Sep-2011 crops’ irrigation water norms in the Comments irrigation season following rehabilitation. Indicator 4: Project WUA collection rates at Number Value 22.00 22.00 379.00 least 65% which meets 55% of required level of Date 01-Sep-2011 30-Jun-2016 Public Disclosure Copy on-farm system MOM in year following training Comments and capacity building. Indicator 5: % of water users satisfied with Percentage Value 20.00 20.00 60.00 WUA managerial and operational performance. Date 01-Sep-2011 30-Jun-2016 Comments Core Indicator 1: Area with improved I&D Hectare(Ha) Value 53000.00 53000.00 0.90 services Date 01-Sep-2011 30-Jun-2016 Comments Page 3 of 6 The World Bank Report No: ISR6688 Core indicator 2:Number of female water users Number Value 20000.00 20000.00 0.33 provided with improved I&D services Date 01-Sep-2011 30-Jun-2016 Comments female female female Public Disclosure Copy Core indicator 2:Number of male water users Number Value 25000.00 25000.00 0.43 provided with improved I&D services Date Comments male male male Core indicator 3:Number of operational WUAs Number Value 208.00 208.00 379.00 strengthened. Date 01-Sep-2011 30-Jun-2016 Comments Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Intermediate Result indicator 1: Number of Number Value 22.00 22.00 340.00 WUAs where basic asset management plans Date 01-Sep-2011 30-Jun-2016 are prepared, approved by the WUA Comments Representative/General Assembly and contributing to the setting of the ISF. Intermediate Result indicator 2: Number of Number Value 22.00 22.00 340.00 WUAs with adequate number of trained and Date 01-Sep-2011 30-Jun-2016 experienced staff implementing good operation Comments and maintenance procedures. Intermediate Result indicator 3: Number of Number Value 22.00 22.00 340.00 WUAs with properly established Date 01-Sep-2011 30-Jun-2016 Representative Zones with water users actively Comments engaging in WUA management through their Zonal Representatives. Intermediate Result indicator 4: Number of Number Value 22.00 22.00 222.00 WUAs with proper offices. Date 01-Sep-2011 30-Jun-2016 Public Disclosure Copy Comments Intermediate Result indicator 5: Number of Number Value 0.00 0.00 90.00 WUAs with business plan and provided with Date 01-Sep-2011 30-Jun-2016 equipment Comments Intermediate Result indicator 1: On-farm I&D Hectare(Ha) Value 0.00 0.00 85000.00 infrastructure brought back to operational Date 01-Sep-2011 30-Jun-2016 condition Comments Page 4 of 6 The World Bank Report No: ISR6688 Intermediate Result indicator 1: Project Text Value ISR Rating Satisfactory Satisfactory management capacity in PIU enhanced and Date 01-Sep-2011 30-Jun-2016 project implementation schedule adhered to Comments Satisfactory PIU Performance Satisfactory PIU Performance Public Disclosure Copy Data on Financial Performance (as of 30-Apr-2012) Financial Agreement(s) Key Dates Project Loan No. Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P107617 IBRD-80390 Effective 26-Apr-2011 25-Oct-2011 21-Dec-2011 30-Jun-2016 30-Jun-2016 P107617 IDA-49130 Effective 26-Apr-2011 25-Oct-2011 21-Dec-2011 30-Jun-2016 30-Jun-2016 Disbursements (in Millions) Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P107617 IBRD-80390 Effective USD 3.20 3.20 0.00 0.01 3.19 0.00 P107617 IDA-49130 Effective USD 76.80 76.80 0.00 3.09 72.71 4.00 Disbursement Graph Public Disclosure Copy Key Decisions Regarding Implementation None. Page 5 of 6 The World Bank Report No: ISR6688 Restructuring History There has been no restructuring to date. Public Disclosure Copy Related Projects There are no related projects. Public Disclosure Copy Page 6 of 6