Procurement Plan for WBADMI Project (P105311) I. General 1. Bank’s approval Date of the procurement Plan Aug 25 2011 2. Date of General Procurement Notice: May 10 2010 3. Period covered by this procurement plan: The procurement period of project covered from year 1st June 2011 to 31st May 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above 1000 000 LIB above 200 000 2. NCB (Goods) >50 000 & < 1000 000 3. NCB (Non-Consultant Services) Do 4. ICB (Works) Above 5000 000 5. NCB (Works) Upto 5000 000 6. National shopping < 50 000 2. Prequalification. NA 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: Project is using a procurement manual, which is agreed with World Bank 5. Any Other Special Procurement Arrangements: Retroactive financing is applicable 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of Nil - no - - the ICB (Works) July 9, 2010 Summary of Nil Nil the ICB (Goods) Summary of 22 150 no post 10 pkgs the NCB are (Works) through shopping Summary of Nil All goods the NCB are (Goods) through shopping (75 pkgs) Summary of Nil Nil the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 300,000 2. Single Source (Firms) Above USD 100 000 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Retroactive financing applicable 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 1.4 4 - All post number of review contracts that will be let under QCBS Summary of 5.5 4 Prior Two Post number of review contracts that July 9, 2010 will be let under other methods July 9, 2010 PROCUREMENT India : IN West Bengal Accelerated Development of Minor Irrigation PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2017-03-23 2019-10-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P105311 GPN Date: Project Name: IN West Bengal Accelerated Development of Minor Irrigation Loan / Credit No: IBRD / 80900, IDA / 50140 Executing Agency(ies): West Bengal Accelerated Development of Minor Irrigation Project WORKS Bid Evaluation Activity Reference No. Estimated Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Bid Evaluation Activity Reference No. Estimated Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual WBR no 14 / procurement Component A. of Geophysical Portable IBRD / 80900 Strengthening Community- Prior Direct Selection Direct 234,600.00 234,600.00 Signed Logger Unit based Institutions WBR No. 12 [ARC-GIS] / Component A. Procurement of ARC-GIS IBRD / 80900 Strengthening Community- Prior Direct Selection Direct 0.00 275,372.90 Signed for SWID based Institutions WBR No 17 ARC GIS for Component A. SPMU / Procurement of IBRD / 80900 Strengthening Community- Prior Direct Selection Direct 70,000.00 67,820.37 Signed Arc GIS Server for SPMU based Institutions WBR 18 [ERDAS Imagine] / Procurement of ERDAS Imagine Professional Component A. Software under WBADMIP IBRD / 80900 Strengthening Community- Prior Direct Selection Direct 0.00 95,981.58 Signed through Direct Contracting based Institutions basis in view of strengthening SPMU and SWID WBR 27 / procurement of Component A. Arc GIS Software for IDA / 50140 Strengthening Community- Prior Direct Selection Direct 223,746.00 217,055.73 Signed Directorate of Agriculture based Institutions under WBADMIP WBR 29 / procurement of Component A. Arc GIS Software for SWID IDA / 50140 Strengthening Community- Prior Direct Selection Direct 176,317.00 169,770.41 Signed under WBADMIP based Institutions WBR # 30 / procurement Component A. of Arc GIS Software for IDA / 50140 Strengthening Community- Prior Direct Selection Direct 185,080.00 182,431.91 Signed DPMUs under WBADMIP based Institutions IN-WBADMIP-12964-GO- DIR / Procurement of Component D. Project Autodesk AutoCAD Civil IDA / 50140 Post Direct Selection Direct 15,088.00 15,170.74 Completed 2017-04-17 2017-04-18 2017-05-12 2017-11-08 Management 3D(Latest Version) by Direct Selection Method IN-WBADMIP-13306-GO- DIR / Training cum Experience Sharing Component D. Project Workshops of WUA's on IDA / 50140 Post Direct Selection Direct 4,621.00 4,593.35 Completed 2017-04-20 2017-04-20 2017-04-25 2017-04-26 Management 26th April 2017 at Vedic Village Spa Resort for World bank Mission Visit, 2017 IN-WBADMIP-13311-GO- DIR / Training cum Experience Sharing Component D. Project Workshops of WUA's on IDA / 50140 Post Direct Selection Direct 3,847.00 3,824.33 Completed 2017-04-20 2017-04-20 2017-04-26 2017-04-27 Management 27th April 2017 at Vedic Village Spa Resort for World bank Mission Visit, 2017 IN-WBADMIP-25655-GO- RFB / Supply of 5 ( Five ) numbers of Differential Global Positioning System Component D. Project Single Stage - One IBRD / 80900 Post Request for Bids Open - National 155,970.00 121,501.52 Completed 2017-08-30 2017-09-04 2017-10-16 2017-11-15 2017-12-20 2018-06-18 (DGPS) Machine for SPMU Management Envelope and 4 PUP Districts DPMUs under WBADMI Project IN-WBADMIP-51951-GO- RFB / Supply of 10 ( Ten ) numbers of Differential Under Component D. Project Single Stage - Two Global Positioning System IBRD / 80900 Post Request for Bids Open - National 239,616.00 214,561.44 Implementat 2018-03-02 2018-03-07 2018-04-18 2018-06-28 2018-08-02 2019-01-29 Management Envelope (DGPS) Machine for ion Different Districts DPMUs under WBADMI Project. IN-WBADMIP-61950-GO- DIR / Procurement of STAAD Solution (Latest Component D. Project IBRD / 80900 Post Direct Selection Direct 13,979.00 13,983.31 Signed 2018-05-08 2018-05-14 2018-06-19 2018-12-16 Version ) by Single Source Management Selection method under WBADMI Project. Page 1 IN-WBADMIP-61953-GO- DIR / Procurement of ArcGIS Desktop Extension- Component D. Project 3D Analyst (Latest Version IBRD / 80900 Post Direct Selection Direct 10,549.00 10,552.20 Completed 2018-05-08 2018-05-14 2018-06-19 2018-12-16 Management ) by Single Source Selection method under WBADMI Project. IN-WBADMIP-65949-GO- RFB / Supply and Installation of 35 ( thirty five ) numbers of Under Differential Global Component D. Project Single Stage - Two IBRD / 80900 Post Request for Bids Open - National 886,783.00 0.00 Implementat 2018-06-08 2018-06-13 2018-07-25 2018-10-08 2018-11-12 2019-05-11 Positioning System (DGPS) Management Envelope ion Machine for different DPMUs/ Divisions of WRIDD including PUP Districts under WBADMI Project IN-WBADMIP-65953-GO- DIR / Engagement of a reputed Nursery for supplying the various plants on waste Pending Component C. Agricultural land/upland development in IBRD / 80900 Post Direct Selection Direct 102,154.00 0.00 Implementat 2018-06-08 2018-06-13 2018-07-18 2019-01-14 Support Services (ASS) the different districts areas ion Bankura, Purulia, Jhargram, Pas. Midnapore, Birbhum etc. of West Bengal as Horticulture activities under WBADMI project on S IN-WBADMIP-67388-GO- DIR / Procurement of Component C. Agricultural Agricultural Implements IBRD / 80900 Post Direct Selection Direct 139,497.00 132,958.40 Completed 2018-06-20 2018-06-25 2018-07-30 2019-01-26 Support Services (ASS) during 2018-19 under WBADMI Project. IN-WBADMIP-68065-GO- RFQ / Engagement of a reputed Organic Manure Supplier for supplying Vermi-compost and Neem Pending Component C. Agricultural Request for Single Stage - One cake for plantation in IBRD / 80900 Post Limited 67,711.00 0.00 Implementat 2018-07-02 2018-08-27 2019-02-25 Support Services (ASS) Quotations Envelope waste land intervention in ion the Purulia District area as Horticulture activities under WBADMI Project as per lowest quotation basis. IN-WBADMIP-68067-GO- RFQ / Engagement of a reputed Organic Manure Supplier for supplying Vermi-compost and Neem Pending Component C. Agricultural Request for Single Stage - One cake for plantation in IBRD / 80900 Post Limited 21,520.00 0.00 Implementat 2018-07-02 2018-08-27 2019-02-25 Support Services (ASS) Quotations Envelope waste land intervention in ion the Paschim Medinipur District area as Horticulture activities under WBADMI Project as per lowest quotation basis. IN-WBADMIP-68068-GO- RFQ / Engagement of a reputed Organic Manure Supplier for supplying Vermi-compost and Neem Pending Component C. Agricultural Request for Single Stage - One cake for plantation in IBRD / 80900 Post Limited 4,906.00 0.00 Implementat 2018-07-02 2018-08-27 2019-02-25 Support Services (ASS) Quotations Envelope waste land intervention in ion the Birbhum District area as Horticulture activities under WBADMI Project as per lowest quotation basis. IN-WBADMIP-68069-GO- RFQ / Engagement of a reputed Organic Manure Supplier for supplying Vermi-compost and Neem Pending Component C. Agricultural Request for Single Stage - One cake for plantation in IBRD / 80900 Post Limited 66,180.00 0.00 Implementat 2018-07-02 2018-08-27 2019-02-25 Support Services (ASS) Quotations Envelope waste land intervention in ion the Bankura District area as Horticulture activities under WBADMI Project as per lowest quotation basis. IN-WBADMIP-68090-GO- DIR / Engagement of a reputed manufacturer for supplying the Micro- Nutrient Fertilizer (Zinc Pending Plus) for plantation crops Component C. Agricultural IBRD / 80900 Post Direct Selection Direct 277.00 0.00 Implementat 2018-06-27 2018-07-02 2018-08-06 2019-02-04 in the different district Support Services (ASS) ion areas of Bankura, Purulia, Paschim Midnapore, Bhirbhum etc of West Bengal under WBADMI Project on SSS basis. IN-WBADMIP-69314-GO- RFQ / Engagement of a reputed Organic Manure Supplier for supplying Vermi-compost for Pending Component C. Agricultural Request for Single Stage - One plantation in waste land IBRD / 80900 Post Limited 28,011.00 0.00 Implementat 2018-07-17 2018-09-11 2019-03-11 Support Services (ASS) Quotations Envelope intervention in the Purulia ion District area as Horticulture activities under WBADMI Project as per lowest quotation basis. IN-WBADMIP-71375-GO- RFB / Procurement of Agriculture Implements for Component C. Agricultural Single Stage - Two IBRD / 80900 Post Request for Bids Open - National 291,020.00 250,217.17 Completed 2018-07-25 2018-07-30 2018-09-10 2018-11-26 2018-12-31 2019-07-01 different districts in the Support Services (ASS) Envelope year 2018-19 under WBADMI Project. Page 2 IN-WBADMIP-77100-GO- DIR / Engagement of a reputed nursery for supplying the various plants in the different Pending districts of Darjeeling, Component C. Agricultural IBRD / 80900 Post Direct Selection Direct 53,183.00 0.00 Implementat 2018-09-06 2018-09-11 2018-10-16 2019-04-14 Uttar Dinajpur, Dakshin Support Services (ASS) ion Dinajpur, Malda, Howrah , S24 Pgs, Nadia, Hooghly and Murshidabad as Horticulture activities under WBADMIP on SSS basis . IN-WBADMIP-77102-GO- RFQ / Engagement of a reputed Organic Manure Supplier for supplying Vermi-compost for Pending Component C. Agricultural Request for Single Stage - One plantation in waste land IBRD / 80900 Post Limited 21,382.00 0.00 Implementat 2018-09-11 2018-11-06 2019-05-05 Support Services (ASS) Quotations Envelope intervention in the ion Howrah,Hooghly,Nadia and S24 Pgs district areas as Horticulture activities under WBADMI Project as per lowest quotatation basis. IN-WBADMIP-77140-GO- DIR / Approval for funding11 ( elevan ) numbers of SOLAR Operated Portable Pump - Pending motor Sets (of 1HP/2 Component B. Irrigation IBRD / 80900 Post Direct Selection Direct 17,389.00 0.00 Implementat 2018-09-06 2018-09-11 2018-10-16 2019-04-15 HP)on pilot basis by SPMU System Development ion in association with Local Agency (M.Dhara &Brothers) using different Check Dam Sites in Bankura/Purulia/Paschim Medinipur of WBADMIP IN-WBADMIP-81605-GO- DIR / Approval for funding15 (Fifteen) numbers of SOLAR Operated Portable Pump -motor Sets (of 1HP/2 HP)on pilot basis Component B. Irrigation IBRD / 80900 Post Direct Selection Direct 25,660.07 26,651.89 Signed 2018-10-11 2018-10-29 2018-12-03 2019-06-03 by SPMU in association System Development with Local Agency (M.Dhara &Brothers) using different Check Dam Sites in Bankura/Purulia/Paschim Medinipur of WBADMIP IN-WBADMIP-81609-GO- DIR / Engagement of NSCL for procurement of Pulse Seeds like Lentil & Green Gram and WBSSCL Component C. Agricultural IBRD / 80900 Post Direct Selection Direct 20,946.72 14,238.56 Completed 2018-10-11 2018-10-29 2018-12-03 2019-06-03 for procurement of Pulse Support Services (ASS) Seeds like Bengal Gram & Lathyrus through Direct Selection under WBADMI Project. IN-WBADMIP-94564-GO- DIR / Engagement of National seeds Corporation Limited (NSC Ltd.) for Procurement of seeds of Under Ground nut & Maize and Component C. Agricultural IBRD / 80900 Post Direct Selection Direct 21,689.91 8,130.23 Implementat 2019-01-11 2019-01-16 2019-02-20 2019-08-19 west Bengal State Seed Support Services (ASS) ion Corporation Limited for Procurement of seeds of Black Gram, Green Gram & Sesame through Direct Contracting under WBADMIP IN-WBADMIP-95341-GO- RFQ / Supply of Table ( Enterprise 1500 Table), Almirah for office of State Component D. Project Request for Single Stage - One IBRD / 80900 Post Limited 1,968.13 1,988.27 Completed 2019-01-23 2019-03-20 2019-09-16 Project management unit, Management Quotations Envelope WBADMI Project, In the Office of the Project Director, WBADMIP. IN-WBADMIP-98928-GO- RFB / Procurement of Different Types of Implements for inter Under Component C. Agricultural Single Stage - Two cropping inside Orchard IBRD / 80900 Post Request for Bids Open - National 110,025.47 0.00 Implementat 2019-02-05 2019-02-11 2019-03-25 2019-06-07 2019-07-12 2020-01-08 Support Services (ASS) Envelope Plantation through National ion Competitive Bidding Procedure (NCB) under WBADMI Project. IN-WBADMIP-103011-GO- RFQ / Supply and Delivery Under of 3000 ( Three Thousand) Component C. Agricultural Request for Single Stage - One IBRD / 80900 Post Limited 3,800.00 3,628.18 Implementat 2019-03-04 2019-04-29 2019-10-28 copies of booklets for Support Services (ASS) Quotations Envelope ion Individual Farmers of WUA's under WBADMIP. IN-WBADMIP-114084-GO- DIR / Procurement of different kind of Paddy, Maize , Black Gram and Pending Groundnut seeds during Component C. Agricultural IBRD / 80900 Post Direct Selection Direct 35,852.00 0.00 Implementat 2019-05-15 2019-05-20 2019-06-24 2019-12-23 Kharif 2019 under Support Services (ASS) ion WBADMI Project from National Seeds Corporation Limited through Single Source Selection. Page 3 IN-WBADMIP-114102-GO- DIR / Engagement of reputed Nurseries for supplying various plants on waste land development in Pending the different districts i.e. Component C. Agricultural IBRD / 80900 Post Direct Selection Direct 94,180.00 0.00 Implementat 2019-05-15 2019-05-20 2019-06-24 2019-12-23 Bankura, Paschim and Support Services (ASS) ion Purba Medinipur, Howrah, Hooghly & S24Pgs of WB (Ph- 2) as Horticulture activities for 2019-20 under WBADMIP. IN-WBADMIP-114103-GO- DIR / Engagement of a reputed Organic Manure Supplier for supplying Vermi-compost for Pending plantation in waste land Component C. Agricultural IBRD / 80900 Post Direct Selection Direct 87,900.00 0.00 Implementat 2019-05-15 2019-05-20 2019-06-24 2019-12-23 intervention in different Support Services (ASS) ion district ie Bankura, Paschim And Purba Medinipur, Howrah, Hooghly & S24Pgs of WB (Ph-2) for 2019-20 under WBADMIP. IN-WBADMIP-114105-GO- DIR / Engagement of reputed Organic Manure (Neem Cake)Supplier for supplying Neem cake for Pending plantation in waste land Component C. Agricultural IBRD / 80900 Post Direct Selection Direct 86,919.00 0.00 Implementat 2019-05-15 2019-05-20 2019-06-24 2019-12-23 intervention in the different Support Services (ASS) ion district ie Bankura, Paschim And Purba Medinipur, Howrah, Hooghly & S24Pgs of WB (Ph-2) for 2019-20 under WBADMIP. IN-WBADMIP-114108-GO- DIR / Procurement of 1 (One) number of UTM for security/multiple ISP (Internet Service Provider) links in SPMU for Pending Component D. Project simultaneously use of 2 IBRD / 80900 Post Direct Selection Direct 5,141.00 0.00 Implementat 2019-05-15 2019-05-20 2019-06-24 2019-12-23 Management (Two) ISPs at Same or ion Alternate time for the Smooth Functioning of Day to Day Internet Related Work in SPMU under WBADMIP IN-WBADMIP-114820-GO- DIR / Engagement of reputed Nurseries for supplying various plants on waste land development in Pending the different districts i.e. Component C. Agricultural IBRD / 80900 Post Direct Selection Direct 35,497.50 0.00 Implementat 2019-05-15 2019-05-20 2019-06-24 2019-12-23 Malda, Uttar & Dakshin Support Services (ASS) ion Dinajpur, Jalpaiguri, Coochbehar & Darjeeling of WB (Ph- 1) as Horticulture activities for 2019-20 under WBADMIP. IN-WBADMIP-114822-GO- DIR / Engagement of a reputed Organic Manure Supplier for supplying Vermi-compost for Pending plantation in waste land Component C. Agricultural IBRD / 80900 Post Direct Selection Direct 35,220.00 0.00 Implementat 2019-05-15 2019-05-20 2019-06-24 2019-12-23 intervention in different Support Services (ASS) ion district ie Malda, Uttar & Dakshin Dinajpur, Jalpaiguri, Coochbehar & Darjeeling of WB (Ph-1) for 2019-20 under WBADMIP. IN-WBADMIP-114825-GO- DIR / Engagement of reputed Organic Manure (Neem Cake)Supplier for supplying Neem cake for plantation in waste land Pending Component C. Agricultural intervention in the different IBRD / 80900 Post Direct Selection Direct 31,806.00 0.00 Implementat 2019-05-15 2019-05-20 2019-06-24 2019-12-23 Support Services (ASS) district ie Malda,Uttar & ion Dakshin Dinajpur,Jalpaiguri,Coochbeh ar &Darjeeling of WB (Ph- 1) for 2019-20 under WBADMIP IN-WBADMIP-115065-GO- DIR / Engagement of reputed Nurseries for supplying various plants on waste land development in Pending the different districts i.e. Component C. Agricultural IBRD / 80900 Post Direct Selection Direct 62,616.00 0.00 Implementat 2019-05-17 2019-05-22 2019-06-26 2019-12-23 Purulia, Birbhum, Burdwan, Support Services (ASS) ion Murshidabad, Nadia & North 24 Parganas of WB (Ph- 3) as Horticulture activities for 2019-20 under WBADMIP. IN-WBADMIP-115066-GO- DIR / Engagement of a reputed Organic Manure Supplier for supplying Vermi-compost for plantation in waste land Pending Component C. Agricultural intervention in different IBRD / 80900 Post Direct Selection Direct 72,578.00 0.00 Implementat 2019-05-17 2019-05-22 2019-06-26 2019-12-23 Support Services (ASS) district i.e. Purulia, ion Birbhum, Burdwan, Murshidabad, Nadia & North 24 Parganas of WB (Ph-3) for 2019-20 under WBADMIP. Page 4 IN-WBADMIP-115068-GO- DIR / Engagement of reputed Organic Manure (Neem Cake)Supplier for supplying Neem cake for plantation in waste land Pending Component C. Agricultural intervention in the different IBRD / 80900 Post Direct Selection Direct 98,378.00 0.00 Implementat 2019-05-17 2019-05-22 2019-06-26 2019-12-23 Support Services (ASS) district i.e. Purulia, ion Birbhum, Burdwan, Murshidabad, Nadia & North 24 Pgs. of WB (Ph- 3) for 2019-20 under WBADMIP. IN-WBADMIP-120178-GO- DIR / Engagement of NSCL ( a Govt. of India undertaking) for supplying different types of Hybrid Under seeds for Kharif Component C. Agricultural IBRD / 80900 Post Direct Selection Direct 36,020.00 0.00 Implementat 2019-06-21 2019-06-26 2019-07-31 2019-12-19 Demonstration Centres (DC) Support Services (ASS) ion in different Districts of West Bengal as horticulture activities for the Financial Year 2019-20 under WBADMI Project. IN-WBADMIP-121570-GO- DIR / Procurement of 10 (Ten) numbers of Video Endpoint Devices for Pending Component D. Project uninterrupted VC among IBRD / 80900 Post Direct Selection Direct 58,012.00 0.00 Implementat 2019-06-29 2019-07-04 2019-08-08 2019-12-20 Management all DPMUs and SPMU ion simultaneously under WBADMI Project on Single Source Selection (SSS) basis. IN-WBADMIP-121571-GO- RFQ / Procurement of 36 (Thirty Six) numbers of pH Tester and Portable Pending Dissolved Oxygen Meter Component C. Agricultural Request for Single Stage - One IBRD / 80900 Post Limited 13,052.00 0.00 Implementat 2019-07-04 2019-08-29 2019-12-19 Pens for Fishery Activities Support Services (ASS) Quotations Envelope ion for the Financial Year 2019- 20 under WBADMI project on the basis of Request For Quotation /Shopping (RFQ). IN-WBADMIP-121573-GO- RFQ / Procurement of Fish Feed from reputed Distribution Agencies for supplying different types of Under international standard Fish Component C. Agricultural Request for Single Stage - One IBRD / 80900 Post Open - National 99,955.00 99,198.91 Implementat 2019-07-04 2019-08-29 2019-12-19 Feeds (ISO, HACCP & Support Services (ASS) Quotations Envelope ion BAP Certified) to the fish farmers for different project areas of ZONE-1 (Purba & Paschim Medinipur and Jhargram). IN-WBADMIP-121575-GO- RFQ / Procurement of Fish Feed from reputed Distribution Agency/ies for supplying different types of Under Component C. Agricultural Request for Single Stage - One international standard Fish IBRD / 80900 Post Open - National 87,018.00 0.00 Implementat 2019-07-04 2019-08-29 2019-12-19 Support Services (ASS) Quotations Envelope Feeds (ISO, HACCP & ion BAP Certified) to the fish farmers for different project areas of ZONE-1,2&3 under WBADMIP. IN-WBADMIP-121577-GO- RFQ / Procurement of Fish Feed from reputed Distribution Agencies for supplying different types Pending international standard Fish Component C. Agricultural Request for Single Stage - One IBRD / 80900 Post Open - National 85,568.00 0.00 Implementat 2019-07-04 2019-08-29 2019-12-19 Feeds (ISO, HACCP & Support Services (ASS) Quotations Envelope ion BAP Certified) to the fish farmer for different project areas of ZONE-2 (Bankura and Purulia districts) under WBADMIP IN-WBADMIP-121578-GO- RFQ / Procurement of Fish Feed from reputed Distribution Agencies for supplying different types Pending international standard Fish Component C. Agricultural Request for Single Stage - One IBRD / 80900 Post Open - National 58,012.00 0.00 Implementat 2019-07-04 2019-08-29 2019-12-19 Feeds (ISO, HACCP & Support Services (ASS) Quotations Envelope ion BAP Certified) to the fish farmer for different project areas of ZONE-3 (Burdwan and Birbhum districts) under WBADMIP IN-WBADMIP-121579-GO- RFQ / Procurement of Fish Feed from reputed Distribution Agencies for supplying International Pending standard Fish Feed Component C. Agricultural Request for Single Stage - One IBRD / 80900 Post Open - National 89,919.00 0.00 Implementat 2019-07-04 2019-08-29 2019-12-19 (ISO,HACCP & BAP Support Services (ASS) Quotations Envelope ion Certified) to the fish farmer for different project areas of ZONE-4 (South 24 Parganas,Nadia,Malda district under WBADMIP. Page 5 IN-WBADMIP-121580-GO- RFQ / Procurement of Fish Feed from reputed Distribution Agency/ies for supplying different types of Under Component C. Agricultural Request for Single Stage - One international standard Fish IBRD / 80900 Post Open - National 37,708.00 0.00 Implementat 2019-07-04 2019-08-29 2019-12-19 Support Services (ASS) Quotations Envelope Feeds (ISO, HACCP & ion BAP Certified) to the fish farmers for different project areas of ZONE-4,5&6 under WBADMI Project. IN-WBADMIP-121581-GO- RFQ / Procurement of Fish Feed from reputed Agencies for supplying of international standard Fish Feeds (ISO,HACCP &BAP Pending Component C. Agricultural Request for Single Stage - One Certified) to the fish IBRD / 80900 Post Open - National 72,515.00 0.00 Implementat 2019-07-04 2019-08-29 2019-12-19 Support Services (ASS) Quotations Envelope farmer for different project ion area of ZONE- 5(Uttar,Dakshin Dinajpur,Darjeeling Kalimpong Districts of WBADMIP. IN-WBADMIP-121582-GO- RFQ / Procurement of Fish Feed from reputed Distribution Agencies for supplying different types of Pending international standard Fish Component C. Agricultural Request for Single Stage - One IBRD / 80900 Post Open - National 42,059.00 0.00 Implementat 2019-07-04 2019-08-29 2019-12-19 Feeds (ISO,HACCP& BAP Support Services (ASS) Quotations Envelope ion Certified) to the fish farmer for different project areas of ZONE-6 (Jalpaiguri and Coochbehar) under WBADMIP. IN-WBADMIP-125653-GO- RFB / Procurement of Different Types of Agriculture Implements to Under increase cropping intensity Component C. Agricultural Single Stage - Two IBRD / 80900 Post Request for Bids Open - National 252,072.00 0.00 Implementat 2019-07-31 2019-08-05 2019-09-16 2019-11-29 2020-01-03 2020-07-01 across the different districts Support Services (ASS) Envelope ion through National Competitive Bidding Procedure (NCB) under WBADMI Project. IN-WBADMIP-127190-GO- RFQ / Procurement of Fish Feeds from reputed Distribution Agency/ies for supplying different types of Pending Component C. Agricultural Request for Single Stage - One Fish Feeds (HACCP & IBRD / 80900 Post Open - National 93,643.00 0.00 Implementat 2019-08-19 2019-10-14 2020-04-11 Support Services (ASS) Quotations Envelope BAP Certified) to the fish ion farmers for Phase – 2 ZONE-1 (Purba & Paschim Medinipur and Jhargram districts) under WBADMIP. IN-WBADMIP-127191-GO- RFQ / Procurement of Fish Feeds from reputed Distribution Agency/ies for supplying different types of Pending Component C. Agricultural Request for Single Stage - One Fish Feeds (HACCP & IBRD / 80900 Post Open - National 96,438.00 0.00 Implementat 2019-08-19 2019-10-14 2020-04-11 Support Services (ASS) Quotations Envelope BAP Certified) to the fish ion farmers for Phase – 2 ZONE-2 (Bankura and Purulia districts) under WBADMIP. IN-WBADMIP-127193-GO- RFQ / Procurement of Fish Feeds from reputed Distribution Agency/ies for supplying different types of Pending Component C. Agricultural Request for Single Stage - One Fish Feeds (HACCP & IBRD / 80900 Post Open - National 92,245.00 0.00 Implementat 2019-08-19 2019-10-14 2020-04-11 Support Services (ASS) Quotations Envelope BAP Certified) to the fish ion farmers for Phase – 2 ZONE-3 (Burdwan and Birbhum districts) under WBADMIP. IN-WBADMIP-127196-GO- RFQ / Procurement of Fish Feeds from reputed Distribution Agency/ies for supplying different types of Pending Component C. Agricultural Request for Single Stage - One Fish Feeds (HACCP & IBRD / 80900 Post Open - National 78,268.00 0.00 Implementat 2019-08-19 2019-10-14 2020-04-11 Support Services (ASS) Quotations Envelope BAP Certified) to the fish ion farmers for Phase – 2 ZONE-4 (South 24 Parganas, Nadia and Malda districts) under WBADMIP. IN-WBADMIP-127197-GO- RFQ / Procurement of Fish Feeds from reputed Distribution Agency/ies for supplying different types of Pending Fish Feeds (HACCP & Component C. Agricultural Request for Single Stage - One IBRD / 80900 Post Open - National 58,701.00 0.00 Implementat 2019-08-19 2019-10-14 2020-04-11 BAP Certified) to the fish Support Services (ASS) Quotations Envelope ion farmers for Phase – 2 ZONE-5 (Uttar & Dakshin Dinajpur,Darjeeling and Kalimpong districts) under WBADMIP. IN-WBADMIP-127199-GO- RFQ / Procurement of Fish Feeds from reputed Distribution Agency/ies for supplying different types of Pending Component C. Agricultural Request for Single Stage - One Fish Feeds (HACCP & IBRD / 80900 Post Open - National 95,040.00 0.00 Implementat 2019-08-19 2019-10-14 2020-04-11 Support Services (ASS) Quotations Envelope BAP Certified) to the fish ion farmers for Phase – 2 ZONE-6 (Jalpaiguri and Coochbehar districts) under WBADMIP. Page 6 IN-WBADMIP-127189-GO- RFQ / Procurement of Poly- houses and floriculture materials including handholding support (3 Under years) for the Commercial Component C. Agricultural Request for Single Stage - One IBRD / 80900 Post Open - National 83,859.00 0.00 Implementat 2019-08-19 2019-10-14 2020-04-11 Cultivation of Carnation Support Services (ASS) Quotations Envelope ion Cut Flowers cluster-wise in the Kalimpong District under Horticulture Activities for the Financial Year 19-20 . IN-WBADMIP-127187-GO- RFQ / Procurement of Poly- houses and floriculture materials including handholding support (3 Under Component C. Agricultural Request for Single Stage - One years) for the Commercial IBRD / 80900 Post Open - National 93,642.00 0.00 Implementat 2019-08-19 2019-10-14 2020-04-11 Support Services (ASS) Quotations Envelope Cultivation of Gerbera Cut ion Flowers cluster-wise in the Kalimpong District under Horticulture Activities for the Financial Year 2019-20. IN-WBADMIP-135489-GO- DIR / Engagement of reputed NSCL(Govt. of India undertaking) and WBSSCL(Govt. of WB Under Undetaking) for supplying Component C. Agricultural IBRD / 80900 Post Direct Selection 49,836.00 0.00 Implementat 2019-09-24 2019-09-24 2019-10-01 2019-11-05 different types of Seeds for Support Services (ASS) ion Rabi Demonstration Centers (DC) in different districts of West Bengal under WBADMIP on Single Source Selection (SSS) basis IN-WBADMIP-135490-GO- RFB / Procurement of Different Types of Implements for “Inter cropping in Plantation Field” & “Vegetable Under Component C. Agricultural Single Stage - Two Cultivation” in IBRD / 80900 Post Request for Bids Open - National 271,140.00 0.00 Implementat 2019-09-24 2019-09-30 2019-11-11 2020-01-24 2020-02-28 2020-08-26 Support Services (ASS) Envelope Paschimanchal and North ion Bengal Region through National Competitive Bidding Procedure (NCB) for FY 2019-20 under WBADMI Project. IN-WBADMIP-135492-GO- RFB / Procurement of Two Types of Pump Motor (2 HP and 3.1 HP ) in Under Darjeeling and Purulia Component B. Irrigation Single Stage - Two IBRD / 80900 Post Request for Bids Open - National 39,271.00 0.00 Implementat 2019-09-24 2019-09-29 2019-11-10 2020-01-23 2020-02-27 2020-08-25 District for effective System Development Envelope ion Irrigation Purposes through National Competitive Bidding Procedure (NCB) under WBADMI Project. IN-WBADMIP-136417-GO- DIR / Engagement of reputed Govt. Organization i.e. NSCL (Govt. of India undertaking) for supplying Pending Cauliflower, Cabbage and Component C. Agricultural IBRD / 80900 Post Direct Selection Direct 34,602.00 0.00 Implementat 2019-09-30 2019-10-05 2019-11-09 2020-05-07 Watermelon etc. for Rabi Support Services (ASS) ion DC in different Districts of West Bengal as Horticulture activities for the FY19-20 under WBADMIP on SSS Basis IN-WBADMIP-141982-GO- RFB / Approval for Procurement of 1HP Solar Pending Potable Pumping System Component B. Irrigation Single Stage - Two IBRD / 80900 Post Request for Bids Open - National 84,581.00 0.00 Implementat 2019-10-22 2019-10-27 2019-12-08 2020-02-20 2020-03-26 2020-09-22 for handed over System Development Envelope ion CD/WDS/PDWs in different districts of project areas under WBADMI Project. IN-WBADMIP-141986-GO- RFB / Approval for Procurement of 0.5 HP Pending Solar Potable Pumping Component B. Irrigation Single Stage - Two IBRD / 80900 Post Request for Bids Open - National 84,581.00 0.00 Implementat 2019-10-22 2019-10-27 2019-12-08 2020-02-20 2020-03-26 2020-09-22 System for handed over System Development Envelope ion CD/WDS/PDWs in different districts of project areas under WBADMI Project. NON CONSULTING SERVICES Bid Evaluation Activity Reference No. Estimated Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-WBADMIP-26365-NC- DIR / Supply and Installation of Internet Connectivity with Video Component D. Project IBRD / 80900 Post Direct Selection Direct 216,798.00 232,058.49 Completed 2017-08-28 2017-09-04 2017-10-09 2019-12-30 conferencing System for Management WBADMI Project in SPMU and in 18 Different Districts DPMUs offices under WBADMIP Page 7 IN-WBADMIP-26953-NC- DIR / Direct contracting for Exhibition expenses and Participation in the Exhibition for "Skoch Component D. Project Award, 2017" & receiving IBRD / 80900 Post Direct Selection Direct 7,170.00 6,891.95 Completed 2017-09-04 2017-09-06 2017-09-07 2017-09-22 Management "Skoch Order-of-Merit" Award at Constitution Club of India,Rafi Marg, New Delhi on 8th September to 9th September, 2017. IN-WBADMIP-46047-NC- DIR / Experience sharing workshop with WUAs in presence of World Bank- Component D. Project IBRD / 80900 Post Direct Selection Direct 8,254.00 7,734.50 Completed 2018-01-25 2018-01-30 2018-02-13 2018-08-13 WBADMIP on 12.02.2018 Management at RAASMANCH in SWABHUMI, The Heritage Plaza , Kolkata. IN-WBADMIP-46049-NC- DIR / Experience sharing workshop with World Bank and Way forward - Component D. Project IBRD / 80900 Post Direct Selection Direct 3,726.00 3,492.10 Completed 2018-01-25 2018-01-30 2018-02-13 2018-08-12 WBADMIP on 13.02.2018 Management at RAASMANCH in SWABHUMI, The Heritage Plaza , Kolkata. IN-WBADMIP-46050-NC- DIR / Procurement for Mission visit for the "Progress Review workshop Component D. Project with World Bank - IBRD / 80900 Post Direct Selection Direct 2,210.00 2,236.64 Completed 2018-01-25 2018-01-30 2018-02-13 2018-08-13 Management WBADMIP on 14.02.2018 at RAASMANCH in SWABHUMI, The Heritage Plaza , Kolkata. IN-WBADMIP-65945-NC- DIR / Direct contracting for Exhibition expenses and Participation in the Exhibition for "Skoch Pending Component D. Project Award, 2018" & receiving IBRD / 80900 Post Direct Selection Direct 20,750.00 0.00 Implementat 2018-06-08 2018-06-13 2018-07-18 2019-01-14 Management "Skoch Order-of-Merit" ion Award at Constitution Club of India, Rafi Marg, New Delhi on 21st June to 23rd June, 2018. IN-WBADMIP-68198-NC- RFQ / Engagement of a reputed Transport Agency for Transporting different species of plants and Pending organic manures from Component C. Agricultural Request for Single Stage - One IBRD / 80900 Post Limited 1,440.00 0.00 Implementat 2018-07-03 2018-08-28 2019-02-25 Arambagh , Hooghly to Support Services (ASS) Quotations Envelope ion different district areas of West Bengal where plantation program has already been taken up under WBADMIP. IN-WBADMIP-69588-NC- RFQ / Consulting Services as Documentation Agency (DA) for Development & Implementation of Communication & Component A. Pending Request for Single Stage - One Documentation Strategy in IBRD / 80900 Strengthening Community- Post Limited 58,441.00 0.00 Implementat 2018-07-18 2018-09-12 2019-03-11 Quotations Envelope Zone -1 (Malda, Uttar based Institutions ion Dinajpur, Dakhkhin Dinajpur, Jalpaiguri , Darjeeling , Coochbehar DPMUs ) under the WBADMI Project. IN-WBADMIP-69590-NC- RFQ / Consulting Services as Documentation Agency (DA) for Development & Implementation of Component A. Pending Request for Single Stage - One Communication & IBRD / 80900 Strengthening Community- Post Limited 58,441.00 0.00 Implementat 2018-07-18 2018-09-12 2019-03-11 Quotations Envelope Documentation Strategy in based Institutions ion Zone -2 (Hooghly, Burdwan, Birbhum and Purulia DPMUs ) under WBADMI Project. IN-WBADMIP-69591-NC- RFQ / Consulting Services as Documentation Agency (DA) for Development & Implementation of Component A. Pending Request for Single Stage - One Communication & IBRD / 80900 Strengthening Community- Post Limited 58,441.00 0.00 Implementat 2018-07-18 2018-09-12 2019-03-11 Quotations Envelope Documentation Strategy in based Institutions ion Zone -3 (Howrah, East Medinipur, West Medinipur, Bankura DPMUs ) under WBADMI Project. IN-WBADMIP-69593-NC- RFQ / Consulting Services as Documentation Agency (DA) for Development & Implementation of Component A. Pending Request for Single Stage - One Communication & IBRD / 80900 Strengthening Community- Post Limited 58,441.00 0.00 Implementat 2018-07-18 2018-09-12 2019-03-11 Quotations Envelope Documentation Strategy in based Institutions ion Zone -1 (North and South 24 Parganas , Nadia, Murshidabad DPMUs ) under the WBADMI Project. Page 8 IN-WBADMIP-80359-NC- RFQ / Engagement of a reputed Transport Agency for Transporting different species of plants from Under Arambagh , Hooghly to Component C. Agricultural Request for Single Stage - One IBRD / 80900 Post Limited 3,000.00 3,050.94 Implementat 2018-10-09 2018-12-19 2019-06-17 different district areas of Support Services (ASS) Quotations Envelope ion Hooghly,Malda,Howrah,Nadi a,Murshidabad,S24Pgs where plantation program has already been taken up under WBADMIP. IN-WBADMIP-97006-NC- RFB / Non-Consultancy Under Services for Aerial LiDAR Component B. Irrigation Single Stage - Two IBRD / 80900 Post Request for Bids Open - National 3,183,656.00 0.00 Implementat 2019-01-28 2019-02-04 2019-03-18 2019-06-04 2019-07-09 2020-01-06 Survey in Different Blocks System Development Envelope ion of PUP and Hilly Districts under WBADMIP. IN-WBADMIP-130399-NC- DIR / Arrangement for the “Review Workshop with Pending SPMU & World Bank and Component D. Project IBRD / 80900 Post Direct Selection Direct 3,472.00 0.00 Implementat 2019-09-04 2019-09-09 2019-10-14 2020-04-11 way forward - WBADMIP” Management ion during Mission visit on 09.09.2019 under WBADMI Project. CONSULTING FIRMS Activity Reference No. Actual Short List and Draft Combined Evaluation Loan / Credit Market Contract Type Estimated Expression of Request for Opening of Technical Evaluation of / Description Component Review Type Method Amount Process Status Terms of Reference Request for Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Interest Notice Proposals as Issued Proposals / Minutes Technical Proposal (US$) Proposals Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 1/WBADMI/consultancy/2015- 16 / Third party QAQC of Component A. construction works for Quality And Cost- Open - IBRD / 80900 Strengthening Community- Prior 64,600,000.00 1,287,231.85 Signed implementation of surface Based Selection International based Institutions water of minor Irrigation under WB ADMI project IN-WBADMIP-25659-CS- CQS / Hiring of Consulting Services for Development & Consultant Implementation of Component D. Project Pending IBRD / 80900 Post Qualification Open - National 46,790.00 0.00 2017-08-30 2017-09-20 2017-11-01 2017-12-01 2018-01-05 2018-07-04 Communication & Management Implementation Selection Documentation Strategy for the WBADMI Project by CQS Procedure. IN-WBADMIP-60040-CS- QCBS / Consultancy Services for Project Management for Component D. Project Quality And Cost- Under IBRD / 80900 Post Open - National 219,675.00 0.00 2018-04-20 2018-05-11 2018-07-26 2018-08-23 2018-09-20 2018-11-15 2019-01-03 2019-12-31 construction of WRI&DD Management Based Selection Implementation Office Building/(s) at Saltlake Sector -V, Kolkata under WBADMI Project. IN-WBADMIP-60041-CS- QCBS / Consultancy Services for Planning, detailed Drawings and Component D. Project Quality And Cost- Under periodical supervision etc. IBRD / 80900 Post Open - National 219,675.00 0.00 2018-04-20 2018-05-04 2018-06-26 2018-07-30 2018-08-31 2018-10-05 2018-11-09 2019-12-31 Management Based Selection Implementation for construction of WRI&DD Office Building at Saltlake Sector -V, Kolkata under WBADMI Project. IN-WBADMIP-35335-CS- QCBS / Consultancy Services for Aerial LiDAR Survey as Pilot-1 in Component B. Irrigation Quality And Cost- different Blocks of PUP IBRD / 80900 Post Open - National 1,193,144.00 0.00 Canceled 2017-11-03 2017-11-03 2017-12-18 2018-01-15 2018-02-14 2018-03-21 2018-04-25 2018-10-22 System Development Based Selection Districts under West Bengal Accelerated Development of Minor Irrigation Project (WBADMIP). INDIVIDUAL CONSULTANTS Activity Reference No. Actual Invitation to Loan / Credit Market Contract Type Estimated Draft Negotiated / Description Component Review Type Method Amount Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Contract (US$) Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual WBR No. 16 / Component A. Consultancy contract with IBRD / 80900 Strengthening Community- Prior Direct Selection Direct 108,989.20 108,115.24 Signed Pradan Development based Institutions services(PDS)- WBADMIP/Pkg 18 WBR No 15 / To host training for bore hole Component A. logging with technical input IBRD / 80900 Strengthening Community- Prior Direct Selection Direct 20,927.00 20,551.61 Signed from USGS, USA under based Institutions WBADMIP WBR 22 / Providing Support to SPMU in design Component A. and implementation of IDA / 50140 Strengthening Community- Prior Direct Selection Direct 142,375.00 140,713.24 Signed Good Agriculture Practice based Institutions in B I & II (North Bengal) WBR 26 / Providing Support to SPMU in design Component A. and implementation of IDA / 50140 Strengthening Community- Prior Direct Selection Direct 142,375.00 140,713.24 Signed Good Agriculture Practice based Institutions in Hilly zone Page 9 WBR 19 / Providing Support to SPMU in design Component A. and implementation of IDA / 50140 Strengthening Community- Prior Direct Selection Direct 142,375.00 140,713.24 Signed Good Agriculture Practice based Institutions in Tarai-Teesta alluvial agro climatic zone WBR 20 / Providing Support to SPMU in design Component A. and implementation of IDA / 50140 Strengthening Community- Prior Direct Selection Direct 142,375.00 140,713.24 Signed Good Agriculture Practice based Institutions in red and lateriticzone WBR 21 / Providing Support to SPMU in design Component A. and implementation of IDA / 50140 Strengthening Community- Prior Direct Selection Direct 142,375.00 140,713.24 Signed Good Agriculture Practice based Institutions in vindhyan Aluvial zone WBR 23 / Providing Support to SPMU in design Component A. and implementation of IDA / 50140 Strengthening Community- Prior Direct Selection Direct 142,375.00 140,713.24 Signed Good Agriculture Practice based Institutions in B I & II (South Bengal) WBR 24 / Providing Support to SPMU in design Component A. and implementation of IDA / 50140 Strengthening Community- Prior Direct Selection Direct 142,375.00 140,713.24 Signed Good Agriculture Practice based Institutions in coastal zone WBR 25 / Providing Support to SPMU in design Component A. and implementation of IDA / 50140 Strengthening Community- Prior Direct Selection Direct 142,375.00 140,713.24 Signed Good Agriculture Practice based Institutions in Gangetic zone WBR 28 / Geophysical Logging of Boreholes Component A. Drilled in various Districts IDA / 50140 Strengthening Community- Prior Direct Selection Direct 262,050.00 254,784.78 Signed of West Bengal Under based Institutions WBADMIP IN-WBADMIP-19651-CS- CDS / Soil Investigation for Component B. Irrigation Construction of Check IBRD / 80900 Post Direct Selection Direct 91,193.00 89,400.59 Completed 2017-06-30 2017-07-11 2017-09-14 2018-09-09 System Development Dams in Various Districts of West Bengal under WBADMIP. IN-WBADMIP-19655-CS- CDS / Consultancy Services on Output Basis from NGO as Service Provider (SP) for Pilot-12 micro- Component A. watershed(MWS IBRD / 80900 Strengthening Community- Post Direct Selection Direct 99,100.00 106,127.10 Completed 2017-06-30 2017-07-11 2017-09-14 2019-11-23 development in Rampurhat- based Institutions II &Muraroi-I, Khairasol Blocks of Birbhum District under District Project Management Unit (DPMU) ,Birbhum of WBADMIP. IN-WBADMIP-19657-CS- CDS / Consultancy Services on Output Basis from NGO as Service Provider (SP) for Pilot-13 micro- Component A. watershed(MWS IBRD / 80900 Strengthening Community- Post Direct Selection Direct 99,100.00 106,056.74 Signed 2017-06-30 2017-07-11 2017-09-14 2019-11-23 development in Jhalda-I based Institutions &Para, Balarampur & Joypur Blocks of Purulia District under District Project Management Unit (DPMU) ,Purulia of WBADMIP. IN-WBADMIP-25656-CS- CDS / Engagement of Individual Consultant on SSS basis for Concept Designing & assisting in Component D. Project developing detailed Design IBRD / 80900 Post Direct Selection Direct 9,358.00 7,986.57 Completed 2017-08-28 2017-09-11 2017-11-15 2018-05-14 Management of Administrative Building of Water Resources Investigation & Development Department under WBADMI Project IN-WBADMIP-25658-CS- CDS / Engagement of a NGO, Nature Environment & wildlife Society ( NEWS) as Financial Development Organization (FDO) for a Component C. Agricultural IBRD / 80900 Post Direct Selection Direct 42,860.00 42,546.93 Completed 2017-08-30 2017-09-11 2017-11-15 2019-11-15 PILOT for augmentation of Support Services (ASS) alternative livelihood options of fishermen through comprehensive development in Balagarh Block,Hooghly District IN-WBADMIP-35326-CS- CDS / Engagement of WAPCOS Ltd. on SSS basis for Consultancy services on geophysical Component B. Irrigation IBRD / 80900 Post Direct Selection Direct 91,822.00 93,276.52 Completed 2017-11-03 2017-11-08 2018-01-15 2018-05-15 surface resistivity survey to System Development pin-point Water Well drilling/digging sites in various Districts under WBADMI Project. Page 10 IN-WBADMIP-35333-CS- CDS / Engagement of Mitchel Drilling India Pvt. Ltd. on SSS basis for Component B. Irrigation IBRD / 80900 Post Direct Selection Direct 99,462.00 102,273.73 Completed 2017-11-03 2017-11-08 2018-01-15 2018-04-17 Consultancy services on System Development geophysical logging of boreholes drilled in various Districts under WBADMI Project. IN-WBADMIP-51549-CS- CDS / Engagement of NGOs as Support Organization (SO) on Output Basis for PILOT-1 Component A. Pending in the district of DPMU IBRD / 80900 Strengthening Community- Post Direct Selection Direct 99,997.00 0.00 2018-02-27 2018-03-12 2018-05-16 2019-12-31 Implementation Birbhum for WUA based Institutions Development and related works at DPMU concerned on Single Source Selection (SSS) basis under WBADMI Project. IN-WBADMIP-51552-CS- CDS / Engagement of NGOs as Support Organization (SO) on Output Basis for PILOT-2 Component A. Pending in the district of DPMU IBRD / 80900 Strengthening Community- Post Direct Selection Direct 69,210.00 0.00 2018-02-27 2018-03-12 2018-05-16 2019-12-31 Implementation Burdwan for WUA based Institutions Development and related works at DPMU concerned on Single Source Selection (SSS) basis under WBADMI Project. IN-WBADMIP-51553-CS- CDS / Engagement of NGOs as Support Organization (SO) on Output Basis for PILOT-3 Component A. Pending in the district of DPMU IBRD / 80900 Strengthening Community- Post Direct Selection Direct 56,906.00 0.00 2018-02-27 2018-03-12 2018-05-16 2019-12-31 Implementation Nadia for WUA based Institutions Development and related works at DPMU concerned on Single Source Selection (SSS) basis under WBADMI Project. IN-WBADMIP-51556-CS- CDS / Engagement of NGOs as Support Organization (SO) on Output Basis for PILOT-4 Component A. Pending in the district of DPMU IBRD / 80900 Strengthening Community- Post Direct Selection Direct 53,830.00 0.00 2018-02-27 2018-03-12 2018-05-16 2019-12-31 Implementation Murshidabad for WUA based Institutions Development and related works at DPMU concerned on Single Source Selection (SSS) basis under WBADMI Project. IN-WBADMIP-51557-CS- CDS / Engagement of NGOs as Support Organization (SO) on Output Basis for PILOT-5 Component A. Pending in the district of DPMU IBRD / 80900 Strengthening Community- Post Direct Selection Direct 58,444.00 0.00 2018-02-27 2018-03-12 2018-05-16 2019-12-31 Implementation Malda for WUA based Institutions Development and related works at DPMU concerned on Single Source Selection (SSS) basis under WBADMI Project. IN-WBADMIP-61854-CS- CDS / Engagement of a NGO as Support Organization (SO) on Output Basis for PILOT-6 Component A. in districts of Darjeeling & Under IBRD / 80900 Strengthening Community- Post Direct Selection Direct 71,376.00 44,677.77 2018-05-09 2018-05-21 2018-07-25 2019-12-31 Kalimpong for Community Implementation based Institutions Mobilization & WUA Development and related works under Darjeeling DPMU on Single Source Selection (SSS) basis under WBADMIP. IN-WBADMIP-62230-CS- CDS / Engagement of a NGO as Support Organisation (SO) on Output Basis for PILOT-7 Component A. in the districts of Bankura Under IBRD / 80900 Strengthening Community- Post Direct Selection Direct 60,864.00 35,464.92 2018-05-10 2018-05-21 2018-07-25 2019-12-31 for Community Mobilisation Implementation based Institutions & WUA Development and related works under Bankura DPMU,WBADMI Project on Single Source Selection (SSS) basis. IN-WBADMIP-62232-CS- CDS / Engagement of a NGO as Support Organisation (SO) on Output Basis for PILOT-8 Component A. in the districts of Jhargram Under IBRD / 80900 Strengthening Community- Post Direct Selection Direct 44,535.00 2,659.87 2018-05-10 2018-05-21 2018-07-25 2019-12-31 for Community Mobilisation Implementation based Institutions & WUA Development and related works under Paschim Medinipur DPMU of WBADMI Project on Single Source Selection (SSS) basis. IN-WBADMIP-62437-CS- CDS / Engagement of a non-profit research for development Organisation Component D. Project (IWMI) as Impact Assessor IBRD / 80900 Post Direct Selection Direct 98,622.00 57,173.63 Completed 2018-05-14 2018-05-28 2018-08-01 2019-01-28 Management (IA) on Output Basis for Impact Assessment on various indicators of the WBADMI Project. Page 11 IN-WBADMIP-65944-CS- CDS / Engagement of a NGO as Support Organization (SO) on Output Basis for PILOT-9 Component A. in the district of South 24- Pending IBRD / 80900 Strengthening Community- Post Direct Selection Direct 44,566.00 0.00 2018-06-08 2018-06-18 2018-08-22 2019-12-31 Parganas for Community Implementation based Institutions Mobilization & WUA Development and related works under South 24- Parganas DPMU, WBADMI Project on Single Source Selection (SSS) IN-WBADMIP-65961-CS- CDS / Engagement of ACCOUNTS CONSULTANT AS ACCOUNTS EXPERT FOR MANAGING AND MONITORING THE WORLD BANK FINANCED Component D. Project IBRD / 80900 Post Direct Selection Direct 8,438.00 7,735.63 Completed 2018-06-08 2018-06-18 2018-08-22 2019-12-31 PROJECT OF WATER Management RESOURCES INVESTIGATION & DEVELOPMENT DEPARTMENT (WRI&DD) UNDER WBADMI PROJECT. IN-WBADMIP-65962-CS- CDS / Engagement of INDIVIDUAL CONSULTANT AS AGRICULTURE EXPERT FOR AGRICULTURE / HORTICULTURE Component D. Project IBRD / 80900 Post Direct Selection Direct 14,064.00 12,892.72 Completed 2018-06-08 2018-06-18 2018-08-22 2019-12-31 RELATED DEVELOPMENT Management OF WATER RESOURCES INVESTIGATION & DEVELOPMENT DEPARTMENT(WRI&DD) UNDER WBADMI PROJECT. IN-WBADMIP-65964-CS- CDS / Engagement of INDIVIDUAL COMMUNITY MOBILIZATION CONSULTANT AS COMMUNITY MOBILIZATION EXPERT Component D. Project IBRD / 80900 Post Direct Selection Direct 11,251.00 10,263.34 Completed 2018-06-08 2018-06-18 2018-08-22 2019-12-31 FOR MOBILIZATION & Management FORMATION OF COMMUNITY BASED INSTITUTIONS AND CAPACITY BUILDING OF WUAs of WRI&DD UNDER WBADMIP. IN-WBADMIP-65965-CS- CDS / INDIVIDUAL OFFICE MANAGEMENT CONSULTANT AS OFFICE MANAGEMENT EXPERT FOR MANAGING AND MONITORING THE WORLD BANK FINANCED Component D. Project IBRD / 80900 Post Direct Selection Direct 8,438.00 7,735.63 Completed 2018-06-08 2018-06-18 2018-08-22 2019-12-31 STATE PROJECT Management MANAGEMENT UNIT(SPMU) OFFICE OF WATER RESOURCES INVESTIGATION & DEVELOPMENT DEPARTMENT(WRI&DD) UNDER WBADMI PROJECT. IN-WBADMIP-77122-CS- CDS / Engagement of a NGO as Support Organisation (SO) on Output Basis in the Component A. Pending districts of Darjeeling and IBRD / 80900 Strengthening Community- Post Direct Selection Direct 38,916.00 0.00 2018-09-06 2018-09-17 2018-11-21 2019-05-20 Implementation kalimpong for Jhora(Spring) based Institutions Rejuvenation & WUA Development and related works under Darjeeling DPMU on SSS basis under WBADMIP. IN-WBADMIP-81581-CS- CDS / Engagement of WAPCOS Ltd. on SSS basis for Consultancy services on geophysical Component B. Irrigation IBRD / 80900 Post Direct Selection Direct 94,266.99 99,849.77 Completed 2018-10-11 2018-11-05 2019-01-09 2019-07-08 surface resistivity survey to System Development pin-point Water Well drilling/digging sites in various Districts under WBADMI Project. IN-WBADMIP-98913-CS- CDS / Engagement of INDIVIDUAL CONSULTANT AS Data Managing Expert FOR Database Management Component D. Project IBRD / 80900 Post Direct Selection Direct 5,525.00 6,265.87 Completed 2019-02-05 2019-02-11 2019-04-17 2019-12-31 RELATED DEVELOPMENT Management OF WATER RESOURCES INVESTIGATION & DEVELOPMENT DEPARTMENT(WRI&DD) UNDER WBADMI PROJECT. IN-WBADMIP-98914-CS- CDS / Engagement of INDIVIDUAL CONSULTANT AS Office Managing Expert FOR Office Management Component D. Project IBRD / 80900 Post Direct Selection Direct 3,684.00 3,786.58 Completed 2019-02-05 2019-02-18 2019-04-24 2019-12-31 RELATED DEVELOPMENT Management OF WATER RESOURCES INVESTIGATION & DEVELOPMENT DEPARTMENT(WRI&DD) UNDER WBADMI PROJECT. Page 12 IN-WBADMIP-98915-CS- CDS / Engagement of INDIVIDUAL CONSULTANT AS Office Accounts Expert FOR Office Accounts OR MANAGING AND MONITORING THE Component D. Project WORLD BANK FINANCED IBRD / 80900 Post Direct Selection Direct 3,684.00 3,832.89 Completed 2019-02-05 2019-02-11 2019-04-17 2019-12-31 Management PROJECT OF WATER RESOURCES INVESTIGATION & DEVELOPMENT DEPARTMENT (WRI&DD) UNDER WBADMI PROJECT. IN-WBADMIP-98916-CS- CDS / Engagement of INDIVIDUAL CONSULTANT AS Office Component D. Project IBRD / 80900 Post Direct Selection Direct 2,763.00 2,874.67 Completed 2019-02-05 2019-02-18 2019-04-24 2019-12-31 Running Expert for Management monitoring of various office files in govt. offices (WRI&DD) under WBADMI Project. IN-WBADMIP-98953-CS- CDS / Engagement of NGOs as Support Organization (SO) on Output Basis for PILOT-1 Component A. Pending in the district of DPMU IBRD / 80900 Strengthening Community- Post Direct Selection Direct 51,622.40 0.00 2019-02-05 2019-02-16 2019-04-22 2019-12-31 Implementation Birbhum for WUA based Institutions Development and related works at DPMU concerned on Single Source Selection (SSS) basis under WBADMI Project. IN-WBADMIP-98959-CS- CDS / Engagement of NGOs as Support Organization (SO) on Output Basis for PILOT-3 Component A. Pending in the district of DPMU IBRD / 80900 Strengthening Community- Post Direct Selection Direct 36,275.20 0.00 2019-02-05 2019-02-18 2019-04-24 2019-12-31 Implementation Nadia for WUA based Institutions Development and related works at DPMU concerned on Single Source Selection (SSS) basis under WBADMI Project. IN-WBADMIP-98960-CS- CDS / Engagement of NGOs as Support Organization (SO) on Output Basis for PILOT-4 Component A. Pending in the district of DPMU IBRD / 80900 Strengthening Community- Post Direct Selection Direct 34,880.00 0.00 2019-02-05 2019-02-18 2019-04-24 2019-12-31 Implementation Murshidabad for WUA based Institutions Development and related works at DPMU concerned on Single Source Selection (SSS) basis under WBADMI Project. IN-WBADMIP-98962-CS- CDS / Engagement of NGOs as Support Organization (SO) on Output Basis for PILOT-5 Component A. Pending in the district of DPMU IBRD / 80900 Strengthening Community- Post Direct Selection Direct 30,694.00 0.00 2019-02-05 2019-02-18 2019-04-24 2019-10-21 Implementation Malda for WUA based Institutions Development and related works at DPMU concerned on Single Source Selection (SSS) basis under WBADMI Project. IN-WBADMIP-102197-CS- CDS / Engagement of INDIVIDUAL CONSULTANT AS Fishery Component D. Project Managing Expert for IBRD / 80900 Post Direct Selection Direct 5,525.00 4,600.80 Completed 2019-02-21 2019-03-04 2019-05-08 2019-12-31 Management Monitoring of Pisciculture activities and implementation in Northern Zone of West Bengal under WBADMI Project. IN-WBADMIP-102199-CS- CDS / Engagement of INDIVIDUAL CONSULTANT AS Fishery Component D. Project Pending Managing Expert for IBRD / 80900 Post Direct Selection Direct 5,525.00 0.00 2019-02-21 2019-03-04 2019-05-08 2019-12-31 Management Implementation Monitoring of Pisciculture activities and implementation in PUP Zone of West Bengal under WBADMI Project. IN-WBADMIP-102201-CS- CDS / Engagement of INDIVIDUAL CONSULTANT AS Fishery Component D. Project Pending Managing Expert for IBRD / 80900 Post Direct Selection Direct 5,525.00 0.00 2019-02-21 2019-03-04 2019-05-08 2019-12-31 Management Implementation Monitoring of Pisciculture activities and implementation in Southern Zone of West Bengal under WBADMI Project. IN-WBADMIP-103862-CS- CDS / Engagement of a non-profit research for development Organization, namely Precision Agriculture for Development Component C. Agricultural IBRD / 80900 Post Direct Selection Direct 93,665.00 50,076.69 Signed 2019-03-02 2019-03-12 2019-05-16 2019-11-12 India Foundation (PADIF) Support Services (ASS) to the implementation of an evidence-based mobile phone extension service to improve farmer's welfare in West Bengal. Page 13 IN-WBADMIP-122374-CS- CDS / Hiring Consultancy Services from Internationally reputed CGIAR Institute,non-profit research Organization, Component C. Agricultural namely ICARDA for the IBRD / 80900 Post Direct Selection Direct 254,812.00 0.00 Canceled 2019-07-11 2019-07-21 2019-09-24 2019-12-19 Support Services (ASS) implementation and development of Digital Augmentation for Accelerating Agro-ecological Intensification in W.B under WBADMIP IN-WBADMIP-129281-CS- CDS / Engagement of a non-profit research Organization, namely Institute of Rural Management Anand (IRMA) Component D. Project Under IBRD / 80900 Post Direct Selection Direct 55,900.00 51,219.75 2019-08-28 2019-09-08 2019-11-12 2020-05-10 for the assessment on the Management Implementation functioning and Socio- Economic changes of the members of the WUA in different districts of West Bengal under WBADMIP. IN-WBADMIP-129290-CS- CDS / Arrangement for the “Experience sharing Component D. Project Pending workshop with World Bank IBRD / 80900 Post Direct Selection Direct 14,833.00 0.00 2019-08-28 2019-09-07 2019-11-11 2020-05-09 Management Implementation and Way forward - WBADMIP” during Mission visit on 11.09.2019. IN-WBADMIP-129291-CS- CDS / Arrangement for the “Experience sharing Component D. Project Pending workshop with WUAs in IBRD / 80900 Post Direct Selection Direct 8,809.00 0.00 2019-08-28 2019-09-07 2019-11-11 2020-05-09 Management Implementation presence of World Bank- WBADMIP” during Mission visit on 12.09.2019. IN-WBADMIP-136414-CS- CDS / Engagement of Individual Consultant on Component D. Project Pending SSS basis as Writer for IBRD / 80900 Post Direct Selection Direct 3,111.00 0.00 2019-09-30 2019-10-11 2019-12-16 2019-12-31 Management Implementation Project Completion Report (PCR) for the WBADMI Project. IN-WBADMIP-140828-CS- CDS / Consultancy Services on engagement of an Individual Consultant for the Computer aided Identification of Component D. Project Pending IBRD / 80900 Post Direct Selection Direct 6,300.00 0.00 2019-10-16 2019-10-26 2019-12-09 2020-01-05 probabilistic traditionally Management Implementation built earthen Check Dams/Water Detention Sites in the Western zones of West Bengal within 2 months duration under WBADMIP. Page 14