Page 1 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date 20.11 12fi\11fi Water Treatment Plant 150,000 m3/d water plant 11caron\1a 136.7 495.3 6.7 10.1 90 : 1&% No No Post 2008.6 12fi\11ffl Water Transmission pipeline D 500-800mm, DI pipe, 50,397M ccent\11ffhungarumlaut 145.6 495.3 6.7 10.1 90 : 1&% No No Prior 2008.6 12fi\11ffi Water distribution network - Tiexi area D 50-500mm DI pipe, 50,937M 1hungarumlautffl 158.3 495.3 6.7 10.1 90 : 1&% No No Post 2008.6 12fi\11ff\10$ Water distribution network - Tiedong area D 50-500mm DI pipes, 16630M 1flhungarumlaut 170.8 495.3 6.7 10.1 90 : 1&% No No Post 2009.6 12fi\11ff\10% Water distribution network - Lishan area D 50-600mm DI pipes, 30375M 1hungarumlauthungarumlaut 179.7 495.3 6.7 10.1 90 : 1&% No No Post 2009.6 12fi\11breve Water-meter system upgrading-A 2,215 water meter chambers/pipe replacement 11fflhungarumlaut 188.6 495.3 6.7 10.1 90 : 1&% No No Post 2008.6 12fi\11caron Water-meter system upgrading-B 2,585 water meter chambers/pipe replacement 11caron\1a 197.5 495.3 6.7 10.1 90 : 1&% No No Post 2009.6 e\11\1ahungarumlaut 12fflfi\11fi Water Treatment Plant Equipment for 150,000 m3/d water plant 11ffdotaccent ICB No No Prior 2008.9 12fflfi\11ffl Water-meter -A 30,000 sets 1ffiffi ICB No No Prior 2008.5 12fflfi\11ffi Water-meter -B 35,000 sets 1brevebreve ICB No No Prior 2009.5 12fflfi\11ff Equipment of leakage testing, Lab. device, vehicle & office (it may be splited in several bids according to the detailed requirement) Pipeline leakage detection/maintenance, Lab. Equipment, engineering vehicles/bus, PCs, printer, photocopier, etc. 1ffff NCB No No Post 2008.4 reve\11hungarumlautfi 3. Subtotal Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 1. Civil Work 2. Equipment & Material Anshan Water Supply 417350LMC21pp.xls 1 11/30/2007 Page 2 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 9.71 HWS/1.1 Water Transmission pipeline D 300-900mm DI/steel pipes, 12,800 m 2.41 NCB No No Post 2008.6 HWS/1.2 Distribution network - south area D 200-600mm DI/steel pipes, 29,745m 2.00 NCB No No Post 2008.6 HWS/1.3 Distribution network - north area D 200-1,200mm DI/steel pipes, 31,586m 3.05 NCB No No Post 2008.4 HWS/1.4 Water-meter system upgrading 1,700 water-meter chambers/pipe replacement 1.28 NCB No No Post 2008.6 HWS/1.5 Enlarging of civil works for Yuhuangshan & Zhongyangpu water plants 40,000 m3/d to100,00 m3/d for Yuhaungshan plant; 20,000 m3/d to 30,000 m3/d for Zhongyangpu plant 0.96 NCB No No Post 2008.8 2.76 HWS/21.1 Equipment supply & installation of Yuhuangshan and Zhongyangpu plants 40,000 m3/d to100,00 m3/d for Yuhaungshan plant; 20,000 m3/d to 30,000 m3/d for Zhongyangpu plant 0.93 ICB No No Prior 2008.10 HWS/21.2 Procurement of water-meter 25,000 sets 1.49 ICB No No Prior 2008.5 HWS/21.3 Equipment of leakage testing, Lab. device, Engineering vehicle & Office equipment (it may be splited in several bids according to the detailed requirement) Pipeline leakage detection/maintenance, Lab. Equipment, Engineering vehicles/bus, Office equipment, etc. 1ffiff\03 NCB No No Post 2008.4 12.46 3. Subtotal 2. Equipment & Material Haicheng Water Supply 1. Civil Work 417350LMC21pp.xls 2 11/30/2007 Page 3 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) f\11fidotaccent FWW/1.1 Upgrading of drainage networks in Wanghua area; Wastewater collection pipeline work in Liujia area Wanghua area: D=300-1,200mm reinforced concrete pipe, eve 149.9 263.2 6.7 3.4 90 : \0f ifi m; Liujia area: D=500-900mm drainage pipe, 3,550 149.9 413.5 6.7 6.7 90 : P\03 11flffl NCB No No Post 2008.3 FWW/1.2 Wastewater collection pipeline in Guchengzhi area; Upgrading of drainage systems in Zhanqian & Gongyuan areas & Changnab open ditch Guchengzhi: D=300-1500mm reinforced concrete pipe, 9,048m; Zhanqian & Gongyuan: D=300-1200mm RCP, 6,558m; Changnan open ditch: 9,770m. 1caronffl NCB No No Post 2008.6 FWW/1.3 River-dyke rehabilitation (0 - 0+360) Dyke-filling:92,000 m 3 ,Roads:90,000 m 2 , Bridge: 8,280m 2 e\11hungarumlautff NCB No No Prior 2008.3 FWW/1.4 River-dyke rehabilitation (0+360 - end) 580,000 m 3 dyke-filling, 120,000 m 2 roads, 22km sewer \11caronfi NCB No No Prior 2009.3 f\11fidotaccent Fushun Wastewater 1. Civil Work 2. Subtotal 417350LMC21pp.xls 3 11/30/2007 Page 4 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) e\11dotaccentffl\03 FSW/1.1 New sanitary landfill construction and existing dump upgrading 250,000 m3 soil/stone excavation, 250,000 m3 earth filling, 188,000 m3 membrane, leakage/gas collection works, etc. e\11dotaccentffl\03 NCB No No Prior 2009.3 1\1adotaccent\03 FSW/21.1 Equipment of solid waste backfill, transportation & Lab. Device Package A: compressor (2) 1\1adotaccent\03 ICB No No Prior 2009.6 Package B: bulldozer (2), excavator (2) Package C: chemical spreading vehicle (1), sludge collection vehicle (5), wangon (1) Package D: vehicles of compressing (17), self-unload (3 sets, 8T), van (1), wangon (1) Package E: Lab. Devices 1ffifl\03 FSW/31.1 Consulting service of sanitary landfill 1ffifl\03 QCBS 11hungarumlautfl\03 Fushun Solid Waste . Subtotal 2. Equipment/material 1. Civil Work 3. Technical assistance 417350LMC21pp.xls 4 11/30/2007 Page 5 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 30.79 YWW/1.1-A Wastewater interceptor & collection pipeline for Qinghua street D=300-1,200mm, L=20.21km 11ffiff\03 NCB No No Post 2009.10 YWW/1.1-B Interceptor of Donghuan road D=300-2,000 x 2,200mm,L=15.17km 1hungarumlauthungarumlaut\03 NCB No No Post 2009.4 YWW/1.2-A Wastewater collection pipeline from Haibin road to No. 14 pumping station D=1,100-2,000 x 2,200mm. L=7.21km 11dotaccentbreve\03 NCB No No Post 2009.4 YWW/1.2-B Wastewater collection pipeline from No. 14 pumping station to Donghuan road D=1,100-2,000 x 2,200mm, L=9.67km 1ff\1a\03 NCB No No Post 2009.4 YWW/1.3 Interceptor of Liaobian district D=700-2,200 x 2,200mm, L=11.46km 1dotaccentdotaccent\03 NCB No No Post 2008.4 YWW/1.4 Interceptor from the Plant to Donghuan road DN=1,600mm, L=3.4km 1fl\1a\03 NCB No No Post 2008.4 YWW/1.5 Civil work of pumping station 6 new pumping stations 1brevebreve\03 NCB No No Post 2008.4 YWW/1.6 Civil work of W.W.T 100,000 m3/d wastewater treatment plant n\11caronff\03 NCB No No Prior 2009.3 arumlaut\11flffl\03 YWW/21.1 Equipment supply and installation of W.W.T 100,000 m3/d wastewater treatment plant e\11caroncaron\03 ICB No No Prior 2009.4 YWW/21.2 Equipment supply and installation of pumping stations 8 pumping stations 11ffi\1a\03 ICB No No Prior 2009.7 YWW/21.3-A Vehicles for W.W.T YWW/21.3-B Lab. Devices for W.W.T YWW/21.4 Office equipment for W.W.T 1flff\03 NS No No Post 2010.2 39.81 1. Civil Work 2. Equipment & Material 3. Subtotal Yingkou Wastewater 1hungarumlautbreve\03 ICB Prior No No 2010.5 417350LMC21pp.xls 5 11/30/2007 Page 6 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 27.04 DI pipe, DN800-500, 12,371m UPVC pipe, DN400-200, 19,528m DI pipes, DN800-500, 5,149m UPVCpipe, DN400-200, 30,895m DI pipe, DN500, 9,147m UPVC pipe, DN400-200, 37,740m YWS/1.4 - A Transportation pipeline (1) DI pipe, DN1200mm L=12.00KM 1breveff NCB No No Post 2008.1 YWS/1.4 - B Transportation pipeline (2) DI pipe, DN1200mm L=12.00KM 1breveff NCB No No Post 2008.1 YWS/1.4 - C Transportation pipeline (3) DI pipe, DN1200mm L=7.30KM 11\1a\1a NCB No No Post 2008.1 YWS/1.5 Water treatment plant 70,000 m3/d WTP 11hungarumlautffi NCB No No Post 2007.11 11hungarumlautbreve YWS/21.1 Water treatment plant equipment supply & installation (70,000 m3/d) 11fiffi ICB No No Prior 2007.12 YWS/21.2 Equipment of leakage testing, Lab. device, vehicle & office (it may be splited in several bids according to the detailed requirement) pipeline leakage detection/maintenance, Lab. Equipment, engineering vehicles/bus, PCs, printer, photocopier, etc. 1dotaccentffl NCB No No Post 2008.6 31.00 YWS/1.3 Distribution network (3) Yingkou Water Supply 1. Civil Work 11ffl\1a YWS/1.1 3. Subtotal 2. Equipment & Material Distribution network (1) NCB YWS/1.2 Distribution network (2) 1brevebreve Post No No No lfldotaccent\11ffi lfldotaccent\11ffi lfldotaccent\11ffi Post Post No No No NCB 11ffcaron NCB 417350LMC21pp.xls 6 11/30/2007 Page 7 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 4.26 YSW/1.1 Sanitary backfill plant 1.0726 million m3 earth/stone excavation,165,000 m2 membrane, leakage/gas collection work, access , etc. 3.65 NCB No No Post 2008.1 YSW/1.2 Sealing of existing pump Sealing work (56,800 m3 earth work, anti-leakage/gas leading), etc 0.61 NCB No No Post 2008.10 1.88 YSW/21.1 Equipment of landfill plant and transportation bulldozer (2), compossor (2), excavator (2), solid waste collection vehicles (25) 1.83 ICB No No Prior 2008.5 YSW/21.2 Office equipment & Lab. Devices 0.05 NCB No No Post 2008.8 6.13 3. Subtotal Yingkou Solid Waste 1. Civil Work 2. Equipment & Material 417350LMC21pp.xls 7 11/30/2007 Page 8 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 18.70 PWW/1.1 Drainage pipe upgrading for Xinghongtai district FRP, DN800-2,000, 4,880m; RC culvert B x H 2,400×2,000 3,000×2,500, 2,710m 5.32 NCB No No Prior 2009.3 PWW/1.2 Drainage pipe upgrading for Shuangtaizhi district DN700-1,800, 11,595m 4.00 NCB No No Post 2008.3 PWW/1.3 Civil work of existing & new pumping stations for Xinglongtai district Construct 2 new stations and upgrade 2 existing stations 1.82 NCB No No Post 2009.3 PWW/1.4 Civil work of existing & new pumping stations for Shuangtaizhi district Construct 2 new stations and upgrade 4 existing stations 1.42 NCB No No Post 2008.7 PWW/1.5 Civil work of W.W.T 50,000 m3/d 6.15 NCB No No Prior 2008.7 9.38 PWW/21.1 Equipment supply and installation of W.W.T 50,000 m3/d 4.67 ICB No No Prior 2009.3 PWW/21.2 Equipment supply and installation for pumping stations of Xinglongtai district 4 pumping stations 2.43 ICB No No Prior 2008.5 PWW/21.3 Equipment supply and installation for pumping stations of Shuangtaizhi district 6 pumping stations 1.50 ICB No No Prior 2009.1 PWW/21.4 Equipment of leakage testing, Lab. device, vehicle & office (it may be splited in several bids according to the detailed requirement) Pipeline leakage detection/maintenance, Lab. Equipment, engineering vehicles/bus, Office equipment, etc. 0.78 ICB No No Prior 2008.9 28.09 2. Equipment & Material Panjin Wastewater 1. Civil Work 3. Subtotal 417350LMC21pp.xls 8 11/30/2007 Page 9 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 4.58 PWS/1.1 Water distribution pipeline (1) Trunk main and distribution lines for Jiuhua area 0.90 NCB No No Post 2008.3 PWS/1.2 Water distribution pipeline (2) for Zhaojia area; water-meter replacing of 39,204 households 1.02 NCB No No Post 2009.3 PWS/1.3 Water distribution pipeline (3) for Panhua area; water-meter replacing of 32,831 households 0.75 NCB No No Post 2010.3 PWS/1.4 Water distribution pipeline (4) for Dongyue area; water-meter replacing of 21,227 households 1.90 NCB No No Post 2011.3 10.92 PWS/21.1 Water-meter, valves (1) Rehabilitation of distribution network (1) 1ffcaron\03 ICB No No Prior 2008.8 PWS/21.2 Water-meter, valves (2) Rehabilitation of distribution network (2) n\11fibreve\03 ICB No No Prior 2009.5 PWS/21.3 Equipment of leakage testing, vehicle (it may be splited in several bids according to the detailed requirement) Pipeline leakage detection/maintenance, engineering vehicles, etc. 1ffifi\03 ICB No No Post 2008.5 15.50 2. Equipment & Material 3. Subtotal Panjin Water Supply 1. Civil Work 417350LMC21pp.xls 9 11/30/2007 Page 10 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 17.32 PSW/1.1 Sanitary landfill plant (phase-I) 591,800 m3 earth/stone excavation,205,000 m2 membrane, leakage/gas collection work, access , etc. 10.07 NCB No No Prior 2009.3 PSW/1.2 Sanitary landfill plant (phase-II) 591,800 m3 earth/stone excavation,205,000 m2 membrane, leakage/gas collection work, access , etc. 7.25 NCB No No Prior 2011.3 1.92 PSW/21.1 Equipment of landfill plant and transportation Bulldozer (2), compressor (2), excavator (2), solid waste collection vehicles (20), etc. 1.86 ICB No No Prior 2009.7 PSW/21.2 Equipment of analysis, mechanical repair, Office equipment, etc. (it may be splited in several bids according to the detailed requirement) 0.06 NCB No No Post 2009.4 19.24 1. Civil work 2. Equipment & Material 3. Subtotal Panjin Solid Waste 417350LMC21pp.xls 10 11/30/2007 Page 11 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 3.56 XWS/1.1 Water distribution network - A D 200-600mm DI/PE pipes,12,177.1m and Pumping Station 1.49 NCB No No Post 2009.3 XWS/1.2 Water distribution network - B & water-meter upgrading D 200-1,000mm, DI/PE pipes,12,505m, also pumping station; 220 water-meter chambers 2.08 NCB No No Post 2008.3 0.34 XWS/21.1 Procurement of water-meters and measuring devices 2,200 sets of meters, etc. 0.14 NCB No No Post 2008.8 XWS/21.2 Equipment of leakage testing, Lab. device, vehicle & Office equipment (it may be splited in several bids according to the detailed requirement) Pipeline leakage detection/maintenance, Lab. Equipment, engineering vehicles/bus, Office equipment, etc. 0.20 NCB No No Post 2008.4 3.90 Xingcheng Water Supply 1. Civil Work 3. Subtotal 2. Equipment & Material 417350LMC21pp.xls 11 11/30/2007 Page 12 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 8.31 GWW/1.1 North-bank interceptor of Daqing river 11,985m, DN600-1,500 2.03 NCB No No Post 2008.1 GWW/1.2 South-bank interceptor of Daqing river & lifting pumping station 9,500m, DN600-1,200 1.45 NCB No No Post 2008.4 GWW/1.3 Civil work of W.W.T 50,000 m3/d wastewater treatment plant 2.84 NCB No No Post 2008.5 GWW/1.4 Rehabilitation of river course Cleaning and rehabilitation of moat 1.99 NCB No No Post 2008.11 3.94 GWW/21.1 Equipment supply and installation of W.W.T - 50,000 m3/d treatment plant 3.61 ICB No No Prior 2008.5 GWW/21.2 Equipment of analysis, mechanical repair, office, etc. (it may be splited in several bids according to the detailed requirement) 0.33 NCB No No Post 2008.5 12.25 Gaizhou Wastewater 3. Subtotal 1. Civil Work 2. Equipment & Material 417350LMC21pp.xls 12 11/30/2007 Page 13 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) Package A A1: Project management & asset management 1.60 QCBS R 2008.5 A2: Service of tendering agency for normal loan project 0.90 NBF 2008.5 A3: Project management for retroactive project 0.10 CQ N 2007.8 A4: Service of tendering agency for retroactive project 0.10 CQ N 2007.8 Subtotal of TA 2.70 Package B Consultancy service of public utility building 2.50 B.1. Lead Public Utility Program Consultants 1.20 QCBS 2008.7 B.2. Benchmarking Consultants 0.30 2008.10 B.3. Training Consultants 0.70 2009.12 B.4. Program Adviseor 0.10 N/A Contingency 0.20 Package C Consultancy service of urban solid waste management 1.50 C.1. Solid Waste TA 1.40 QCBS 2008.7 C.2. Fushun Landfill Design NBF 2008.4 C.3. Fushun Landfill Experts 0.10 N/A Package D Consultancy service of urban water pollution management & master plan 1.00 D.1. Wastewater TA 1.00 QCBS 2008.7 Subtotal of GEF 5.00 234.07 Note: 1) Procurement method: ICB = international bidding, NCB = local bidding, NS = national (local) shopping, NBF = non-Bank fund, CQ = cost based on qualification of Consultancy firms. 2) Pre-review by the Bank: R = required, N/R = not required. Total for LMC-2 Technical assistance GEF grant 417350LMC21pp.xls 13 11/30/2007 Page 14 Comments (Implementation time) 2008.6-2008.12 2008.7-2010.10 2008.6-2009.10 2009.6-2010.6 2009.6-2010.6 2008.6-2009.10 2009.6-2010.10 2008.10-2009.4 2008.6-2008.10 2009.6-2009.10 2008.4-2008.10 2008.6-12 2008.7-11 2008.5-11 2008.7-2009.8 2008.9-2009.11 2008.11 -2009.10 2008.6-2008.11 2008.4 -2009.6 2008.4-10 417350LMC21pp.xls 14 11/30/2007 Page 15 Comments (Implementation time) 2008.7-11 2008.4-11 2009.4-2010.10 2009.4-2009.10 2009.7-10 2009.11-2010.5 2009.5-2009.10 2009.5-10 2009.5-10 2008.5-2009.10 2008.4-10 2008.5-2009.6 2009.4-2010.8 2009.6-2010.11 2009.8-2010.12 2010.6-2010.11 417350LMC21pp.xls 15 11/30/2007 Page 16 Comments (Implementation time) 2010.3-2010.6 2008.1-11 2008.1-11 2008.1-11 2007.12-2008.11 2008.1-12 2008.7-12 2008.2-2008.10 2008.10 - 2009.9 2008.6 - 2008.10 2008.9 -2008. 12 2009.4-2010.11 2008.4-2009.12 2009.4-2009.12 lfl ccent 221.0 102.7 6.7 3.4 90 : \11 221.0 106.0 6.7 3.4 90 : ff 221.0 109.4 6.7 3.4 90 : \10 l lfl ccent 203.2 102.7 6.7 3.4 90 : \11 203.2 106.0 6.7 3.4 90 : ff 203.2 109.4 6.7 3.4 90 : \10 l 2010.6-2010.11 lfl ccent 185.5 102.7 6.7 3.4 90 : \11 185.5 106.0 6.7 3.4 90 : ff 185.5 109.4 6.7 3.4 90 : \10 l 417350LMC21pp.xls 16 11/30/2007 Page 17 Comments (Implementation time) 2008.8-2009.8 2008.9-2009.11 2009.4- 2010.10 2008.6-11 2009.2-2009.10 2008.10-2009.6 2008.4-2009.6 2009.4--2010.10 2010.4-2011.10 2011.4-2012.10 2008.9-2009.9 2009.6-2010.6 2008.6-11 417350LMC21pp.xls 17 11/30/2007 Page 18 Comments (Implementation time) 2009.4 - 2010.6 2011.4-2012.6 2009.8-12 2009.5-12 2009.4-11 2008.4-11 2008.8-12 2008.4-10 2008.2-11 2008.5-11 2008.6-11 2008.11 - 2009.6 2008.6 - 2009.6 2008.5-11 417350LMC21pp.xls 18 11/30/2007 Page 19 Comments (Implementation time) 417350LMC21pp.xls 19 11/30/2007 Page 20 Comments (Implementation time) 2008.7 - 2012 2008.6 - 2012 2007.9 - 2008.6 2007.9 - 2008.6 2008.8 - 2012 2008.11 - 2012 2010.1 - 2012 2008.1 - 2012 2008.8 - 2010 2008.5 - 2010 2008.1 - 2010 2008.8 - 2010 417350LMC21pp.xls 20 11/30/2007 Page 21 93.1 172.0 7.7 3.8 90 : \1a ccent arumlaut 93.1 200.3 7.7 7.7 90 : fifl 93.1 210.4 7.7 7.7 90 : fifi l 93.1 232.5 7.7 3.8 90 : fi 93.1 242.6 7.7 3.8 90 : ffl 93.1 252.7 7.7 3.8 90 : ffi 93.1 262.7 7.7 3.8 90 : ff e n 93.1 293.0 7.7 3.8 90 : \1a ccent arumlaut 93.1 321.3 7.7 7.7 90 : fifl 93.1 331.4 7.7 7.7 90 : fifi l 93.1 353.5 7.7 3.8 90 : fi 93.1 363.5 7.7 3.8 90 : ffl 93.1 373.6 7.7 3.8 90 : ffi 93.1 383.7 7.7 3.8 90 : ff e n 93.1 413.9 7.7 3.8 90 : \1a ccent arumlaut 93.1 442.3 7.7 7.7 90 : fifl 93.1 452.3 7.7 7.7 90 : fifi l 93.1 474.4 7.7 3.8 90 : fi 93.1 484.5 7.7 3.8 90 : ffl 93.1 494.6 7.7 3.8 90 : ffi 93.1 504.7 7.7 3.8 90 : ff e n 93.1 534.9 7.7 3.8 90 : \1a ccent arumlaut 93.1 563.2 7.7 7.7 90 : fifl 93.1 573.3 7.7 7.7 90 : fifi l 93.1 595.4 7.7 3.8 90 : fi 93.1 605.5 7.7 3.8 90 : ffl 93.1 615.5 7.7 3.8 90 : ffi 93.1 625.6 7.7 3.8 90 : ff e n 93.1 655.9 7.7 3.8 90 : \1a ccent arumlaut 93.1 684.2 7.7 7.7 90 : fifl 93.1 694.3 7.7 7.7 90 : fifi l AWS/1.1 AWS/21.1 AWS/1.2 AWS/1.3 - AWS/1.4 - AWS/1.5 - AWS/1.6 1) lfl\1a lfifl 2) \08 418.0 266.8 7.7 3.8 90 : \12 lflcaron lfl\1a 3) (NCB) 448.7 192.2 7.7 3.8 90 : ffi n 448.7 282.9 7.7 3.8 90 : ffl 448.7 303.1 7.7 3.8 90 : ffi n taccent (ICB) n arumlaut 459.3 282.9 7.7 3.8 90 : ffi 459.3 303.1 7.7 3.8 90 : ff l taccent / (NCB) 469.9 192.2 7.7 3.8 90 : ffl 469.9 212.3 7.7 3.8 90 : ffi 469.9 282.9 7.7 3.8 90 : ffl 469.9 303.1 7.7 3.8 90 : ffi 469.9 363.5 7.7 3.8 90 : ffi n / (ICB) 480.4 192.2 7.7 3.8 90 : ff n 480.4 282.9 7.7 3.8 90 : ff e e arumlaut / (ICB) n arumlaut e n l taccent lfifl - ( lflcaron lfl\1a lfldotaccent lflhungarumlaut