Document of The World Bank The African Development Bank FOR OFFICIAL USE ONLY Report No. 47928-LR INTERNATIONAL DEVELOPMENT ASSOCIATION INTERNATIONAL FINANCE CORPORATION AND AFRICAN DEVELOPMENT FUND JOINT COUNTRY ASSISTANCE STRATEGY FOR THE REPUBLIC OF LIBERIA FOR THE PERIOD FY09-FY11 World Bank West Africa Department 1 IFC Sub-Saharan Africa Department African Development Bank Regional Department West 2 Last Interim Strategy Note: June 14, 2007 (Report No. 39821-LR) REPUBLIC OF LIBERIA ­ FISCAL YEAR July 1 - June 30 CURRENCY EQUIVALENTS (as of Sept 30, 2008) Currency Unit = Liberian Dollar (LR$) US$1.00 = 61.5000 LR$ WEIGHTS AND MEASURES Metric System ACRONYMS AND ABBREVIATIONS ACPA Accra Comprehensive Peace Accord ADB African Development Bank ADF African Development Fund AFCRTF African Food Crisis Response Trust Fund AFL Armed Forces of Liberia BOB Bureau of Budget BWIs Bretton Woods Institutions CBL Central Bank of Liberia CDD Community-driven Development CDP Country Dialogue Paper CMC Contracts and Monopolies Commission CMCO Cash Management Committee CPA Comprehensive Peace Agreement CSA Civil Service Agency DDRRP Disarmament, Demobilization, Rehabilitation, and Reintegration Program DFID Department for International Development DHS Demographic and Health Survey DSRP Department of Sectoral and Regional Planning DTIS Diagnostic Trade Integration Study EC European Commission ECOMOG Economic Community of West African States Monitoring Group ECOWAS Economic Community of West African States EDF European Development Fund EFCRP Emergency Food Crisis Response Program EGIRP Economic Governance and Institutional Reform Project EGSC Economic Governance Steering Committee EIP Emergency Infrastructure Project EITI Extractive Industries Transparency Initiative EPA Environment Protection Agency EPAG Economic Empowerment of Adolescent Girls EU European Union FAPA Fund for African Private Sector Assistance FAO Food and Agriculture Organization FDA Forest Development Authority FDI Foreign Direct Investment FIAS Foreign Investment Advisory Service First TF Financial Sector Reform and Strengthening Initiative FPCR TF Food Price Crisis Response Trust Fund FY Fiscal Year FSF Fragile States Facility (ADB) FSU Fragile States Unit ii GAC General Auditing Commission GAC TF Governance and Decentralization Trust Fund GEF Global Environment Fund GEMAP Governance and Economic Management Assistance Program GFDRR Global Facility for Disaster Reduction and Recovery GOL Government of Liberia GRC Governance Reform Commission GSA General Service Agency GDP Gross Domestic Product HIPC Heavily Indebted Poor Countries I-CSP Interim Country Strategy Paper IDP Internally Displaced People IFC International Finance Corporation IFI International Financial Institution IFMIS Integrated Financial Management Information System IMF International Monetary Fund I-PRS Interim Poverty Reduction Strategy ISN Interim Strategy Note ITAS Integrated Tax Administration System JSSL Justice Sector Support to Liberia LACE Liberia Agency for Community Empowerment LAN Local Area Network LCEP Liberia Community Empowerment Project LEC Liberia Electricity Corporation LICUS Low Income Countries under Stress LIPA Liberia Institute of Public Administration LPERP Primary Education Recovery Program LPRC Liberia Petroleum Refining Company LRDC Liberia Reconstruction and Development Committee LRTF Liberia Reconstruction and Development Trust Fund LTU Large Tax Payers Unit LURD Liberians United for Reconciliation and Democracy LWSC Liberia Water and Sewerage Corporation MDG Millennium Development Goals MDTF Multi-donor Trust Fund MFU Macro-Fiscal Unit MODEL Movement for Democracy in Liberia MOE Ministry of Education MOF Ministry of Finance MOJ Ministry of Justice MOP Ministry of Planning and Economic Affairs MTEF Medium-Term Expenditure Framework NARDA New African Research Development Agency NGO Non-governmental Organization NPA National Port Authority NTGL National Transitional government of Liberia NTFP Non-timber Forest Products PCCF Post-Conflict Country Facility PEFA Public Expenditure Financial Accountability PEMFAR Public Expenditure Management and Financial Accountability Review PPCC Public Procurement and Concessions Commission PRGF Poverty Reduction and Growth Facility PRS Poverty Reduction Strategy RFTF Results Focused Transitional Framework RIA Roberts International Airport RMU Resource Management Unit SC Steering Committee SDR Special Drawing Rights SME Small and Medium Enterprises SMP Staff Monitored Program iii SOE State-owned Enterprise SWAP Sector-wide Approach TFLIB Trust Fund for Liberia TOR Terms of Reference UA Unit of Account of the ADB UNHCR United Nations High Commissioner for Refugees UNICEF United Nations Children's Fund UNMIL United Nations Mission in Liberia USAID United States Agency for International Development USTD United States Treasury Department UNDP United Nations Development Program UNMIL United Nations Mission in Liberia WB World Bank iv WORLD BANK AFRICAN DEVELOPMENT BANK Vice President: Obiageli K. Ezekwesili Vice President: Joseph B. Eichenberger Country Director: Ishac Diwan Acting Country Issa Koussoube Director Country Manager: Ohene Nyanin Fragile States Unit Margaret Kilo Manager Task Team Leader: Barbry Keller Country Economist Saloua Sehili Task Team Members Eunice Barroso, Emmanuel Task Team Members Cecil Nartey, Sheikh Sesay, Fiadzo, Errol Graham, Theophile Guezodje Victoria Gyllerup, Kristiina Karjanlahti, Rebecca Simson INTERNATIONAL FINANCE CORPORATION Vice President Thierry Tanoh Country Director Yolande Duhem Resident Jumoke Jagun Representative and Task Team Leader Strategy Unit Frank Douamba Core CAS Team Maria Miller, Bako Freeman, Mary Agboli v Acknowledgements The Liberia Joint Country Assistance Strategy benefited from the valuable contributions and inputs of the following colleagues: From the World Bank: Paola Agostini, Hortenzia Beciu, Lisa Bhansali, Juan Costain, Peter Darvas, Asmaou Diallo-Bah, Giulio de Tommasu, Philip English, Boris Gamarra, Luigi Giovine, Kremena Ionkova, Chris Jackson, Ekaterina Koryukin, Peter Kristensen, Smile Kwakuwume, Nathalie Lahire, Yi-Kyoung Lee, Kofi Marrah, Soheyla Mahmoudi, Fanny Missfeldt-Ringius, Deo Ndikumana, Anne Njuguna, A. Waafas Ofosu-Amaah, Gylfi Palsson, Alexander Preker, Martien Van Niewkoop, Tom Walton, Giuseppe Zampaglione From the IFC: Imoni Akpofure, Jim Emery, David Bridgman, Emmanuel Nyirinkindi, Isabel Marques-de Sa, Peter White, Ram Mahidhara, Tom Butler, Sam Akyianu, Kwame Abrokwa, Julie Earne, From the ADB: Yero Baldeh, Purohit Bhargav, Yeshiareg Dejene, Gaston Gohou, Ellen Goldstein, Jarmo Hukka, Rogers Lubunga, Rex Situmbeko, Tove Strauss, Marilyn Whan-Kan, James Wahome, Sameh Wassel. vi JOINT COUNTRY ASSISTANCE STRATEGY FOR LIBERIA CONTENTS EXECUTIVE SUMMARY .................................................................................................... ix I. Introduction...................................................................................................................... 1 II. COUNTRY CONTEXT AND RECENT DEVELOPMENTS ....................................... 2 A. Country and Political Context...................................................................................... 2 B. Economic Context and Outlook................................................................................... 3 C. Debt.............................................................................................................................. 8 D. Poverty Profile ........................................................................................................... 11 III. COUNTRY DEVELOPMENT PROGRAM AND ISSUES......................................... 13 A. Country Priorities and Agenda................................................................................... 13 B. Structural and Sectoral Development and Challenges............................................... 14 Infrastructure.................................................................................................................. 14 Agriculture and natural resources.................................................................................. 14 Human Development ..................................................................................................... 15 Private Sector Development .......................................................................................... 16 C. Governance and Anti-Corruption Efforts .................................................................. 17 Public Sector Reform..................................................................................................... 18 Public Financial Management........................................................................................ 18 D. Cross-Cutting and Other Issues ................................................................................. 19 Capacity Building .......................................................................................................... 19 Gender Issues................................................................................................................. 20 Trade Development........................................................................................................ 20 Environmental sustainability ......................................................................................... 21 Regional Integration....................................................................................................... 21 IV. IMPLEMENTATION OF THE INTERIM STRATEGY AND LESSONS LEARNED22 V. WORLD BANK GROUP AND AFRICAN DEVELOPEMT BANK GROUP ASSISTANCE STRATEGY ................................................................................................. 23 A. Principles for World Bank Group and African Development Bank Group Engagement in Liberia................................................................................................................................ 23 B. Expected Outcomes ................................................................................................... 24 Theme 2: Rehabilitating infrastructure to jump-start economic growth........................ 26 Theme 3: Facilitating Pro-Poor Growth ........................................................................ 28 Cross-cutting objective: capacity development ............................................................. 34 Strategic mainstreaming................................................................................................. 35 C. Lending ...................................................................................................................... 35 D. Non-lending Program................................................................................................. 37 E. Trust Funds ................................................................................................................ 39 VI. CAS MONITORING..................................................................................................... 40 VII. PARTNERSHIPS AND PARTICIPATION.................................................................. 42 A. Partnerships and Donor Coordination........................................................................ 42 vii B. Participation............................................................................................................... 43 VIII.MANAGING RISK ....................................................................................................... 44 IX. SCALING UP AND EXIT STRATEGY ...................................................................... 45 Annex 1: Draft Results Matrix for Liberia CAS (FY09-FY11) ............................................ 47 Annex 2: Draft Liberia CAS M&E Plan................................................................................ 56 Annex 3: Liberia World Bank Portfolio and Pipeline (including Trust Funds) ................... 65 Annex 4: Summary of Non-Lending Services...................................................................... 67 Annex 5: Selected Indicators of Bank Portfolio Performance and Management ................. 68 Annex 6: Liberia at a Glance ................................................................................................ 69 Annex 7: Liberia Social and Economic Indicators ............................................................... 72 Annex 8. Liberia - Key Exposure Indicators ........................................................................ 74 Annex 9: IBRD/IDA Program Summary.............................................................................. 75 Annex 10: CAS Annex B3 (IFC & MIGA) for Liberia........................................................ 76 Annex 11: IFC's Committed and Outstanding Portfolio...................................................... 77 Annex 12: Operations Portfolio (IBRD/IDA and Grants).................................................... 78 Annex 13: Liberia: Country Financing Parameters ............................................................. 79 Annex 14: Joint Bank-Fund Debt Sustainability Analysis ................................................... 85 Annex 15: CAS Consultations.............................................................................................. 89 Annex 16: Liberia: Fund Relations...................................................................................... 93 Annex 17: Donor Coordination in Liberia............................................................................ 98 Annex 18: Country Map ....................................................................................................... 99 Boxes Box 1: Sources of Vulnerability and Opportunity in Liberia ................................................... 8 Box 2: Status of Liberia's Progress towards the HIPC Completion Point ............................. 10 Box 3: IFC strategy in Liberia ................................................................................................ 31 Box 4: Possible Policy Responses to the Global Slowdown .................................................. 33 Figures Figure 1: CAS Strategic Themes and Outcomes .................................................................... 25 Tables Table 1: Liberia: Selected Economic Indicators, 2006­11............................................................. 4 Table 2: Liberia: Public and Publicly Guaranteed Stock of Debt................................................... 9 Table 3: Key Poverty and Social Indicators, 2007 ...................................................................... 11 Table 4: Liberia CAS Indicative Program: Main Funding Sources (FY09-12)............................ 38 Table 5: Indicative Planned Analytic Work.................................................................................. 39 Table 6: Trust Fund Commitments and Relevance to Core Program........................................... 41 Table 7: Key Donor Activities in Liberia ..................................................................................... 43 viii EXECUTIVE SUMMARY i. This country assistance strategy--prepared jointly by the World Bank, the African Development Bank (ADB) Group, and the International Finance Corporation--sets out planned lending and non-lending support by the World Bank Group and African Development Bank to Liberia over the period FY09-12 (April 2009-June 2011). ii. Liberia's economy, institutions, and human capacity were devastated by the country's 14-year civil war, which ended in 2003. Since then, this country of about 3.5 million people has made important progress despite the considerable difficulties and risks that remain. It has held elections, reestablished a public financial management system, begun rebuilding public sector institutions, reestablished the delivery of some essential public services, and laid the foundations of a local government system. iii. A twelve-month Joint Interim Strategy for mid-2007 to mid-2008 provided a framework for the engagement of the World Bank Group1 and the African Development Bank under the rubric of Liberia's Interim Poverty Reduction Strategy (PRS).2,3 The Interim Strategy focused on rebuilding the shattered institutions of the state, as well as the infrastructure desperately needed to jump-start economic growth. Most of the activities pursued under this strategy are still in progress. The ongoing World Bank portfolio of US$160 million and ADB portfolio of US$39 million include operations supporting economic governance, transport, basic services, and capacity development. Despite significant constraints stemming from lack of capacity, uneven governance, and implementation difficulties, the World Bank program has begun to deliver results. In addition, the African Development Bank program introduced under the Interim Strategy is now largely in place, and intermediate results will be tangible during the CAS period. iv. The government has made great strides over the past year, but, like most very poor countries, Liberia is likely to be negatively affected in the near-term by the global financial crisis and economic slowdown. The clearance of more than US$1.5 billion in arrears with the World Bank, the ADB, and the IMF has opened the door to development programs with the international financial institutions and unblocked the path to full debt relief under the Multilateral Debt Reduction Initiative. Prospects are good for settling a large commercial debt inherited from past regimes. In addition, Liberia has shown its commitment to maintaining its strong macroeconomic program, the good governance reforms, and the anti-corruption efforts that underpinned a first development policy operation under the World Bank Group's new program. Nonetheless, the country is extremely vulnerable to the ongoing global economic slowdown, remaining very poor, highly dependent on a few primary export commodities (mainly rubber), as well as on foreign capital, remittances, and on imported food and fuel. 1The term "World Bank Group" denotes IBRD/IDA and IFC; the term "World Bank" denotes IBRD/IDA only. 2See Liberia: Joint Interim Strategy Note, June 2007. 3See Liberia: Joint African Development Bank/World Bank Interim Strategy Note (ISN) 2007-2008 (ADB/BD/WP/2007/77, ADF/BD/WP/2007/51). ix v. The government's first full Poverty Reduction Strategy (PRS), introduced in March 2008, and covers the period 2008­2011. Based on extensive consultations and a thorough poverty analysis, the PRS has four core strategic areas of intervention: peace and security; economic revitalization; governance and rule of law; and infrastructure and basic services. In addition, it pursues a number of priority crosscutting themes, including gender equity, peace- building, environmental issues, HIV and AIDS, children and youth, and monitoring and evaluation. vi. The Joint Country Assistance Strategy (CAS) of the World Bank Group and the ADB Group is fully aligned with the PRS and is designed to support Liberia's transition from post-conflict recovery to long-term development. To address some key constraints on growth, as well as to enhance the policy and institutional framework to ensure that growth is increasingly pro-poor, the CAS will pursue three strategic themes: (i) rebuilding core state functions and institutions; (ii) rehabilitating infrastructure to jump-start economic growth; and (iii) facilitating pro-poor growth. The strategy will also pursue the crosscutting objective of capacity development. Gender and the environment are important elements that will be increasingly mainstreamed into World Bank Group and ADB programs. The activities supported will be consistent with a regional integration perspective, given the government's expressed interest in achieving benefits from West African regional integration. Though the full implications of the global economic slowdown are not known yet, the two banks will tailor their assistance to help Liberia provide social protection while improving its macroeconomic management. vii. The focus of the CAS is selective, given Liberia's limited implementation capacity. New projects are carefully targeted, largely avoiding entry into new sectors. The choice of activities is consistent with the comparative advantages of both banks as well as the leadership of other donors in certain thematic areas, and with the government's expressed wish to focus of the bulk of new investment finance on rebuilding transport and other infrastructure. viii. The following measurable improvements are expected by the end of the CAS period4: · Improved efficiency of government budget preparation and execution, and enhanced revenue administration; · Increased professionalization and human resource management of the civil service; · Improved access to key infrastructure services; · Improved agricultural productivity and production; · More effective management of natural resources; · A better business and investment climate; and · Increased access to social protection in the face of shocks ix. Under the CAS, both the World Bank Group and the ADB Group will continue their current activities in Liberia while also providing new financing and analytical and advisory services. The World Bank Group proposes to deepen its work on public financial management and institutional reform, financial sector development and access to finance; expand 4See Annexes 1 and 2 for monitorable indicators and monitoring and evaluation plans. x its infrastructure and agriculture development programs; and intensify its support for natural resource-led but pro-poor growth. The program will be supported by a combination of IDA (US$138 million over the three-year CAS period), regional funding of around $160 million, IFC investments and advisory work, and trust-fund financing (approximately US$310 million), including through a new multilateral donor trust fund for infrastructure, the Liberia Reconstruction and Development Trust Fund, that the World Bank will administer. The bulk of IDA's financing is for high-priority infrastructure development. Budget support is intended to provide a signal to other development partners to channel more resources through Liberia's budget. The World Bank will work flexibly to ensure that its activities respond to the challenges posed by the global financial crisis. Emphasis will be placed on labor-intensive public works, technical assistance in the areas of public financial management and procurement, and advisory services in the real sectors. The IFC program focuses on improving the investment climate, strengthening the financial sector, facilitating the revival of agribusiness, and advising and participating in investments in the real sector, as well as supporting the emergence of small and medium-size enterprises linked to the bigger projects being implemented in the country. IFC is working closely with the two banks on public-private partnership solutions to Liberia's vast infrastructure reconstruction needs. x. The African Development Bank Group plans to provide an indicative US$88 million in new financing from the African Development Fund (ADF) and Fragile States Facility (FSF), subject to Liberia's eligibility to the FSF. New projects will provide continued support for governance reform and for rehabilitating and extending water supply and sanitation, and will help to scale up agricultural productivity through rural infrastructure support and agricultural production development and marketing. Potential new investments through the ADB's private sector window will target the banking, mining, and renewable energy sectors. xi. Analytical and advisory work by the World Bank Group and ADB will be aligned with the strategic themes and crosscutting issues of the CAS, and will focus on creating the knowledge base for strong policy advice and on identifying specific strategies for enhancing pro- poor growth. The World Bank Group's work program addresses economic management, financial sector reform, women's economic empowerment, and pro-poor growth. ADB's program includes a water sector reform study and action plan, a public expenditure and financial assessment, a gender profile, a fragile states needs assessment study, and analytic work recommended by the latter study. xii. Implementation of the CAS is subject to three broad risks. The first is a large risk of external shocks, not only of lower demand and lower prices for Liberia's key exports but also of a slowdown in aid and foreign direct investment inflows, reduced remittances from abroad for poor households, and difficulty in importing food and fuel caused by difficulties in obtaining trade finance. A second key risk is related to insecurity and a return to conflict, particularly in light of the gradual UN troop drawdown. Related to this is a significant political and corruption risk, as vested interests with varying degrees of commitment to reform compete for scarce resources. Third, Liberia's fundamental lack of capacity creates enormous implementation risks. Though the two banks cannot seek to provide a comprehensive approach to the security and political risks inherent in Liberia's post-conflict environment, the Joint Strategy is designed specifically to target risky areas and provide support and incentives for Liberia to continue xi current reform efforts. The close dialogue with the International Monetary Fund under the macroeconomic reform program, along with social protection provided through community development and cash for work programs, will also help mitigate risks of instability. Projects will be carefully designed to offset corruption risks, while simultaneously building local implementation capacity. xii I. INTRODUCTION 1. This Country Assistance Strategy--prepared jointly by the World Bank, the African Development Bank Group, and the International Finance Corporation--sets out planned lending and non-lending support by the World Bank Group and African Development Bank Group to Liberia over the period FY09-12 (July 2008-June 2011). The joint strategy (CAS) is rooted in a results-based framework and aligned with the priorities set out in Liberia's PRSP, which the World Bank Board discussed in August 2008. As the country emerges from the immediate post-conflict period, its central challenge is to deepen its reforms and strengthen its institutional capacity, in pursuit of stability and shared and sustained growth over the medium term. On this basis, the CAS has three main objectives: (i) rebuilding core state functions and institutions; (ii) rehabilitating infrastructure to jump-start economic growth; and (iii) facilitating pro-poor growth, with capacity development as an important crosscutting theme. Initiatives to address gender and environmental sustainability are integrated throughout the strategy, which also respects the importance of efforts to promote West African regional integration. 2. Both the World Bank Group and the ADB Group will provide new financing while continuing their current activities in Liberia. From the World Bank, planned new IDA grant financing--of US$138 million over the three-year CAS period--will be complemented by expected trust-fund financing of approximately US$140 million. The bulk of the World Bank's financing is for infrastructure development, particularly in the transport sector--the highest priority identified in the PRSP. The Bank will also scale up its support for governance reform, and work to put in place the foundations of shared growth. Budget support is intended to provide a signal to other development partners to channel more resources through Liberia's budget. The Bank will work flexibly to ensure that its activities respond to the challenges posed by the global financial crisis, working through existing institutions and emphasizing labor-intensive public works, technical assistance in the areas of public financial management and procurement, and advisory services in the real sectors. The IFC program focuses on improving the investment climate, strengthening the financial sector, facilitating the revival of agribusiness, and advising and participating in investments in the real sector, as well as supporting the emergence of small and medium-size enterprises linked to the bigger projects being implemented in the country. IFC is working closely with the World Bank and the ADB on public-private partnership solutions in infrastructure. The African Development Bank Group plans to provide an indicative US$88 million in new financing from the African Development Fund (ADF) and Fragile States Facility (FSF), should eligibility to financing under the Fragile States Facility (FSF) be granted. ADB's new projects will provide continued support for governance reform and for rehabilitating and extending water supply and sanitation, and will help scale up agricultural productivity through rural infrastructure support and agricultural production development and marketing. Potential new investments through the ADB's private sector window will target the banking, mining, and renewable energy sectors. 1 II. COUNTRY CONTEXT AND RECENT DEVELOPMENTS A. Country and Political Context 3. Liberia's economy, institutions, and human capacity were devastated by the country's 14 year civil war, which ended in 2003. The 2003 Accra Comprehensive Peace accord and the deployment of a UN peacekeeping force have provided much-needed space to lay a solid foundation for recovery. Since that time, Liberia has made important progress, holding elections, re-establishing a public financial management system, beginning to rebuild public sector institutions, delivering some essential public services, and laying the foundations of a local government system. 4. Both the World Bank Group and the ADB Group have been assisting Liberia since the conflict ended. The World Bank Group has focused on emergency stabilization support, to begin rebuilding state institutions and restoring public services. During this period, it has supported basic economic governance reforms, community-driven development for service delivery, and emergency infrastructure rehabilitation. ADB provided emergency assistance in the health sector in 2001 and 2003 as well as statistical capacity building assistance in 2005, all through grant resources. Since 2005, ADB has been assisting Liberia to rehabilitate and extend infrastructure, strengthen institutional capacity through good governance and economic policy reform, and address its debt and arrears. 5. The government's top concern is to stimulate economic growth, by getting major transport corridors functioning to open up trade and commerce, revitalizing agriculture, and rebuilding Liberia's devastated energy infrastructure. Job creation is also crucially important, particularly in the short term, to ensure that citizens see tangible benefits from peace and reform. On the policy side, the government is beginning to consolidate economic governance reforms, moving beyond the Governance and Economic Management Assistance Program (GEMAP)5 to fully owned and functioning public financial management, and to rebuild state institutions, including the civil service. The government is also beginning to rebuild state capacity for basic service delivery in health and education, as the NGOs that provided relief services during wartime dismantle their operations. 6. The political situation remains fragile. Popular expectations for tangible peace dividends remain high. Strained relations between the Executive and the opposition-controlled Parliament have complicated the passage of new legislation necessary to enforce reforms, and the delicate political balance constantly threatens the gains made on governance and against corruption. Ongoing Truth and Reconciliation Commission hearings are contributing to a national dialogue around the events of the war. The government has taken important actions to prevent corruption, including adopting a national anti-corruption policy and strategic framework measures designed to reduce corruption, but a perception persists of a culture of impunity for 5A multi-donor program that has been in place since 2005 to secure the government's revenue streams and curb corruption; GEMAP instituted strong expenditure controls in the Ministry of Finance and introduced a zero- tolerance policy on corruption. 2 wrongdoers.6 Finally, Liberia's fragile economic recovery is threatened by the global economic crisis, which could further exacerbate domestic tensions. 7. Strong international support has helped to consolidate peace and security. UNMIL has deployed 15,000 peacekeepers and 1,115 police personnel to Liberia. By early 2007, UNMIL had disarmed and demobilized about 102,000 combatants and rehabilitated some 65,000 of them, though about 37,000 ex-combatants remained to be placed in reintegration programs. UNMIL and its partners have also supported the restructuring of the national police and army and the re-establishment of state authority throughout the country. Presently there are 10,231 peacekeepers and 1,226 police personnel in Liberia, with another draw down of 2,000 military personnel expected to begin in September 2009. A recent assessment concluded that this drawdown in coming years would progress more slowly than originally envisaged, in order to prevent a premature return to instability. While security along Liberia's borders with Sierra Leone, Cote d'Ivoire, and Guinea is stable at present, ongoing crises in several neighboring countries remain cause for concern. 8. Donors have rallied around the new Liberian government, providing significant support. However, because of the weakness of Liberia's state systems and capacity, most of their aid remains off budget and outside of country systems. The challenge is now to move beyond humanitarian to development assistance, to scale up small, transaction-intensive interventions, and increase efficiency by moving aid on to the government budget in ways that improve domestic capacity. B. Economic Context and Outlook 9. Liberia's economy collapsed during the war. Liberia is a small, open economy strongly dependent on trade. Traditional exports included rubber, cocoa, and more recently iron ore, palm oil, gold, diamonds, and forest products. During the 1960s and 1970s, the economy grew rapidly, spurred mainly by exports of mining products (primarily iron ore) and rubber. But mining and rubber production were enclave industries that benefited the political elite disproportionately and did not sustain poverty reduction. Though real GDP in 1980 reached US$890 per capita, the economy began losing momentum soon afterwards, partly because of the second oil shock, and the festering social discontent erupted into brutal civil war in 1989. The economy contracted sharply during the hostilities, and though it began to recover during a hiatus in the conflict between 1997 and 2001, it slumped again during the two subsequent years of war. 10. Since the peace accord in 2003, the economy has posted a strong recovery. Real GDP growth gathered speed, spurred by agriculture, retail trade, communications, transport, and construction, and, as the security situation improved, both foreign and domestic investment in Liberia expanded. A strong recovery in export growth in 2005 and 2006 was based mostly on rubber; large-scale mining and timber production have not yet recommenced. Looking ahead, the prospects are favorable for further strong GDP growth as 6In principle, civil society will have an important role to play in curbing corruption in Liberia, by holding government to account and demanding transparency, but at present it lacks the necessary capacity. 3 security continues to improve. Higher private sector-led investment, including substantial foreign direct investment, can be expected in the key export sectors of forestry and mining. Vigorous growth in construction is expected to continue and a recovery in agriculture is expected to pick up pace with the strong demand for food and higher food prices. Table 1: Liberia: Selected Economic Indicators, 2006­11 Indicator 2006 2007 2008 2009 2010 2011 Est. Est. Proj. Proj. Proj. Real GDP (% growth) 7.8 9.5 7.1 4.9 7.5 10.3 Consumer prices (annual average % growth) 7.2 11.4 17.5 -0.5 4.5 5.0 Consumer prices (end of period %) 8.9 11.7 9.4 4.0 5.0 5.0 Exchange rate (annual average L$/US$) 58.4 60.8 63.3 :: :: :: Exports, f.o.b (US$ million) 162 208 260 111 173 354 Imports, f.o.b (US$ million) 441 499 667 652 829 938 External Current Account Balance, incl. grants (% of GDP) -16.3 -37.2 -40.7 -39.4 -59.9 -49.6 Broad Money (% Change) 34.4 40.1 41.4 8.9 17.3 16.6 Revenues and Grants (% of GDP) 15.0 22.0 26.3 30.5 33.6 33.3 Grants (% of GDP) 1/ 0.2 0.8 2.0 1.3 3.5 Expenditures (% of GDP) 12.9 18.3 25.1 32.8 33.3 34.2 Overall surplus or deficit (incl. grants, cash basis) 2.1 3.8 1.2 -2.3 0.3 -0.9 Domestic Debt (% of GDP) 38.6 35.9 34.3 30.7 Public sector external debt (inc arrears US$ million) 5,032 4,201 4,036 4,134 135 142 Public sector external debt (% of GDP) 823 572 483 499 15 9 Debt service charges (% of GDP) 0.1 0.2 0.1 0.2 0.1 0.8 All figures are expressed as percent of GDP unless otherwise specified. Overall fiscal balance on cash basis 1/ Assumes full delivery of HIPC Initiative, MDRI and beyond-HIPC assistance 11. Liberia's economic recovery has produced a consistent rise in fiscal revenues, albeit from a very low base. Total tax revenues reached 22 percent of GDP in 2006/07, coming from international trade (50 percent), income (30 percent), and domestic goods and services (19 percent). The government's commitment to cash-based budgeting has helped to keep spending in line with revenues, in the face of enormous demand for public spending. Liberia's per capita public spending (US$40 per capita in FY06/07) is among the lowest in the world, and is insufficient to meet the country's vast reconstruction needs. Thus, Liberia depends heavily on aid, estimated at US$300 -500 million annually. 12. The improving fiscal trends reflect a wide range of measures taken by the government. The multi-donor GEMAP has provided significant external support for reform of public financial management. The government has taken measures to improve tax and customs administration. It has improved the budget preparation process and implemented an interim commitment control system to ensure that spending does not exceed available revenues and that procurement practices keep to new public procurement guidelines. Given the relatively large 4 domestic revenue base, a major challenge for the government in the medium term will be to manage its spending in ways that maximize value for money, combat corruption, and benefit the poor. 13. As Liberia makes the transition from post-conflict recovery to laying the foundations for long-term development, a stable macroeconomic environment will be critical to the achievement of rapid, inclusive and sustainable growth. The Government's macroeconomic framework would be anchored on sound fiscal, monetary, trade and exchange policies to foster competition, maintain price stability and encourage private sector investment to provide a foundation for rapid and sustained growth to increase employment and reduce poverty. 14. The Government's macroeconomic framework projects GDP growth to average 7.6 percent per annum for the 2009-2011 period down from the average of 14.3 percent per annum projected prior to the global economic slowdown. Growth is expected to be driven largely by new investments in key sectors including mining, rubber (substantial replanting) and infrastructure (rebuilding of roads). The global economic slowdown has resulted in lower primary commodity prices with adverse effects on planned investments in related sectors. The lower price for logs may also result in delay in some of the start-up from the concessions that the government has recently signed. Overall investment in 2009 is therefore expected to be lower than planned, contributing to slower growth. The growth projection for 2009 is 4.9 percent, down from 7.1 percent in 2008 and significantly below the original projection of 14.3 percent. As primary commodity prices improve and the production from the forestry and iron ore industry increase and export agriculture improves, GDP growth is expected to rise to about 7.5 percent in 2010 and further to 10.3 percent in 2011 as the global economy recovers. The authorities intend to reduce inflation from nearly 12 percent in 2007 to single digit in 2009-2011. Inflation (end of period), which was 9.4 percent in 2008 as a result of higher food and fuel prices, is expected to moderate to about 4 percent in 2009 largely as a result of the sharp decrease in food and fuel prices. The inflation rate is expected to moderate at around 5 percent in 2010 and 2011. A protracted global economic slowdown beyond 2010 with attendant lower primary commodity prices, further fall-off in remittances and a possible slowdown in donor support could have substantial adverse consequences for Liberia. A low case scenario could see GDP growth falling below 4 percent for 2009 and 2010 with adverse fiscal and balance of payments consequences. 15. Macroeconomic stability is expected to be supported by prudent fiscal policy. The Government is committed to maintaining a balanced cash-based budget for most of the PRS period in order to maintain macroeconomic stability and maximize the fiscal space for the implementation of the PRS. On the revenue side, the Government will continue its efforts to broaden the tax base through tax policy reforms and modernization of domestic tax and customs administration. The Government is also making efforts to maximize access to grants and to encourage donors (including through initiatives to improve PFM) to increasingly channel grants through the government's budget. The Government therefore expects to raise revenues as a share of GDP from an estimated 26.3 percent in 2007/08 to 30.5 percent in 2008/09 and to 33.3 percent by 2010/11. On the expenditure side, the Government intends to improve the efficiency, quality and transparency of public expenditure while keeping spending to the limits of revenues. The 5 improvement on the expenditure side should come from inter alia new PFM legislation, improvement in budget preparation, executing, reporting and auditing as well as improvement in procurement planning and implementation. The fiscal policy framework envisages a small fiscal deficit of 2.3 percent of GDP (on a cash basis after grants) in 2008/09 largely reflecting the lower revenues as a result of the external shock to the economy as well as a result of the resumption of debt service. The fiscal balance is expected to revert to a small surplus of 0.3 percent in 2009/10. A small deficit of less than 1 percent of GDP is projected for 2010/11. A reduction in fiscal revenues from the slower growth below 6 percent could force the Government to eliminate its already anemic capital spending and cut the already meager social spending on health and education, given its inability to borrow to sustain such expenditures. 16. The 2008/09 budget, which was approved by the Parliament on August 5, 2008, continues the vein of a cash-balanced budget with zero borrowing. The "core budget" targets spending of US$265.3 million (excluding amortization) to be financed by projected revenues of US$249.2 million leaving a gap to be finance by a drawdown of the Government's accumulated balances at the central bank. It is estimated that about 20 percent of the revenues will come from payments from the mining and forestry concessions as well as from the surplus of state-owned enterprises. The budget also consists of a "contingent budget" of US$27.9 million, to be financed from revenues, which the government considers less certain, including payments from concessions which are currently being tendered. 17. The monetary policies envisaged under the macroeconomic framework of the PRS are expected to contribute to macroeconomic stability by reducing inflationary pressures and keeping the exchange rate stable. In the latter regard, the primary tool for the central bank is the foreign exchange auction. To enhance the monetary policy framework, the central bank will continue to strengthen the policy tools to manage liquidity and exchange rate stability. The Government intends to build on its success in strengthening the domestic banking system as evidenced by the strong increase in the minimum capital requirements and the capital adequacy ratio7 of the banking system, the system for regular on-and-off site inspection of banks and the publication of a list of banks licensed to operate in Liberia. The recent assessment from the IMF suggests that with the strengthening of the banking and the limited integration with the global financial system the risk of capital outflow is not significant. The Government recognizes the limited scope for exchange rate policy in the currently highly dollarized environment in Liberia. However, the IMF has assessed that Liberia's real effective exchange rate (REER) does not appear to be out of line with fundamentals and have been relatively stable since 2003. The IMF has also advised that initiatives to strengthen the demand for Liberian dollar should be market based and that the Central Bank of Liberia should not attempt to target a specific level for the exchange rate. 18. Liberia is an open import/export dependent economy and so policies affecting its trade and balance of payments are an integral part of its overall macroeconomic policy 7The Liberia Central Bank increased the required minimum capital from US$2 million to US$6 million by December 2008, to US$8 million by December 2009, and to US$10 million by December 2010; the capital adequacy ratio has been raised from 8 percent to 10 percent since December 2008. 6 framework. The external current account deficit is expected to widen in the short term as exports and remittances falter in 2009 in the face of rising imports to fuel reconstruction need. The current account deficit is expected to show only marginal improvements in the medium term as export-led growth recovers, driven by the recovery in mining, forestry and the export crop sector including cocoa and oil palm. Based on these developments and the expected reduction in debt service payments after HIPC completion point, the government expects its external current account position to deteriorate from a deficit of 39.4 percent of GDP in 2009 (a much higher deficit than the 35.5 percent projected before the global slowdown) to a higher deficit of 59.9 percent of GDP in 2010 before improving to a deficit of 49.6 percent of GDP in 2011-also much higher that the original projected deficit of 19 percent of GDP. The current deficit is expected to be fully financed by official transfers and foreign direct investments. Nevertheless, Liberia would continue to require large amount of grant financing for the implementation of the PRS and to ensure stability in its external accounts. A protracted global slowdown beyond 2010 with lower commodity prices, a further reduction in remittances and possibly lower aid flows could possibly result in a widening of the current account deficit, possibly beyond what could be fully finance by foreign direct investment and transfers and thereby putting pressure on the limited reserves of the central bank. 19. In summary, Liberia's macroeconomic framework, which forms the basis for its PRGF support from the IMF, provides an adequate basis for the proposed strategy. The Government has generally demonstrated a satisfactory track record in maintaining prudent macroeconomic policies that are sustainable over the medium term. However, this framework is subject to significant domestic risks (security and political) as well as external shocks including that from the recent financial crisis and the ensuing global economic slowdown. The adverse effects of the global slowdown could be substantial if the slowdown is protracted beyond 2010. 20. Several factors make Liberia particularly vulnerable to the downturn in the global economy that has followed the significant shock to financial markets. These include: (i) lower demand and consequently lower prices for primary exports; (ii) lower remittance inflows for poor households; (iii) reduction in foreign direct investment, possibly resulting in the delay of investment projects; (iv) difficulty in importing food and fuel, due to the lack of trade finance; and (v) difficulty in closing the financing gap on the Poverty Reduction Strategy, due to a decrease in official aid. 21. The depth and duration of the global slowdown are uncertain, and Liberia's best response is to maintain its strong reform agenda and continued fiscal prudence. Continued strong collaboration between the government and its development partners will be paramount. There may also be a need to strengthen the regional dialogue, to mitigate an increased threat of hostility. 7 Box 1: Sources of Vulnerability and Opportunity in Liberia Strengths Weaknesses · Relatively strong fiscal position; Liberia · High poverty incidence. operates a balanced cash budget and its · Large current account deficit, driven by budget control system is improving. import needs for reconstruction in the face · Liberia has not contracted any new debt in of slower than expected growth in exports. recent years, and its existing external debt · High dependence on trade taxes. burden will be largely forgiven once HIPC · Fragile though improving security situation completion point is reached. significantly increases the risk premium · Banking system is relatively resilient to that would be attached to higher cost shocks as it is well capitalized and has capital as a result of the financial crisis. high loan-loss provisions. · Weak business environment is a · Budget surplus in the last few years has disincentive for foreign investors resulted in the build-up of some reserves. · Economy is undiversified and industrial · A good track record of reforms, and a sector is extremely small. strong medium-term framework embodied · Weak governance and institutions hinder in the PRSP, makes Liberia a priority donor and investor confidence. candidate for ODA flows. Opportunities Threats · Liberia has both the labor supply and the · A reduction in foreign capital inflows arable land to provide a significant (remittances, investment, ODA) could response by increasing its food supply, increase poverty and affect Liberia's thereby reducing import demand while development prospects. providing the basis for a vibrant agro- · A disruption in trade financing could cause industry. food and fuel shortages on the Liberian market. · Higher economic volatility could increase the risks of renewed conflict in the sub- region. · A reduction in investment in forestry, agriculture, and mining could reduce fiscal revenues. C. Debt 22. Liberia has made substantial progress in resolving its debt but challenges remain. The stock of external debt was provisionally estimated at about US$4.7 billion at end-June 2007, almost evenly split among multilateral, bilateral, and commercial creditors (Table 2). 8 Table 2: Liberia: Public and Publicly Guaranteed Stock of Debt (US$ million, unless otherwise specified) Nominal Debt Stock Jun-2007 Percent Total 4,732.2 100 Multilateral 1,614.8 34.1 World Bank 442.6 9.4 IMF 809.2 17.1 AfDB 271.3 5.7 Other 91.7 1.9 Bilateral 1,542.9 32.6 Paris Club Creditors 1,413.9 29.9 Non-Paris Club Creditors 129.0 2.7 Commercial 3/ 1,574.6 33.3 Commercial Banks 1,325.5 28.0 Suppliers Credits 249.0 5.3 23. Liberia reached the Decision Point under the Enhanced Heavily Indebted Poor Countries (HIPC) initiative in March 2008, as a result of clearing its arrears to the World Bank and ADB in December 2007, and those to the IMF in March 2008. Reaching this point enables the government to benefit from interim relief under the HIPC initiative. As a result of the clearance of the arrears, Liberia's total debt stock is estimated at about US$3.1 billion at end- 2008. Steps still need to be taken to reach the HIPC Completion Point. Box 2 shows where Liberia now stands with regard to these requirements. 24. Looking ahead, the achievement of a robust external debt position will depend on real GDP growth and on export and revenue performance as well as on prudent debt management. The Liberian government has already reached agreement with its Paris Club creditors. In December 2008, the government began good-faith negotiations with its commercial creditors,8 and a debt purchase offer was launched in January 2009 with the intent of extinguishing a significant portion of the debt owed to commercial creditors. The debt purchase is being supported by a grant under the World Bank's Debt Reduction Facility with support from donors; including Germany, Norway, the United Kingdom and the United States. 8This effort is supported by a technical assistance grant under the Bank's Debt Reduction Facility (DRF). 9 Box 2: Status of Liberia's Progress towards the HIPC Completion Point Triggers Status PRSP On track Full PRSP · Prepare a full PRSP through a participatory process and implement satisfactorily its finalized in April 2008.. recommended actions for at least one year, as evidenced by an Annual Progress Report submitted by the government to the staffs of IDA and the IMF. Macroeconomic stability On track. Second review · Maintain macroeconomic stability, as evidenced by satisfactory performance under to be completed under a PRGF/EFF-supported program. program. Public financial management On Track. PPCC · Quarterly Publication in the Procurement bulletin and monthly publication in the quarterly bulletin "Alert" Website of all signed procurement contracts over US$25,000 for goods, US$10,000 includes report of signed for consulting services, and US$50,000 for works and all signed-sole source procurement contracts procurement and concessions contracts which have been identified by the PPCC as and concessions. a result of the PPCC's compliance monitoring activities for at least 6 months leading Audit of Ministry of up to the completion point Finance completed and · Complete successive annual external audits of five key government ministries other ministry audits (Health, Education, Public Works, Finance and Lands, Mines and Energy), prepared underway. under the authority of the General Auditing Commission, submitted to the legislature PFM law submitted to and disclosed publicly · parliament; IMF TA to Implement the new PFM law and supporting financial regulations for at least 12 help develop regulations. months leading up to the completion point. Social sectors On Track. Main · Ensure that the Basic Package of Health Services is delivered in at least 40 percent components of BPHS of all health facilities nationwide. being delivered in 32 · Complete a harmonized and regularized Ministry of Education payroll. percent of all health facilities. Audit of MOE payroll conducted and procedures for adding and removing teachers from payroll finalized. Debt Management On Track. Debt · Develop a debt management strategy in consultation with partners and establish a management strategy debt management unit recording all information on external and domestic public and adopted in June 2008 publicly guaranteed debt, including for state owned enterprises, and ensure it is and debt management operational for at least 12 months leading up to the completion point. unit established. Debt · Publish, on a quarterly basis and on a government website, data on external and recording underway. domestic public and publicly guaranteed debt, including debt stocks and terms and conditions of new loan agreements for at least 6 months leading up to the completion point. Governance On Track. Investment · Implement a revised investment incentive code to ban granting tax exemptions incentive code developed outside the Liberia Revenue Code. and expected to be · Regular public reporting of payments to, and revenues received by, the government submitted to Legislature for the extractive industries (mining and minerals) in a participatory manner in line in early 2009. with EITI criteria during at least the year leading up to the completion point. Anti-Corruption · Establish an independent Anti-Corruption Commission consistent with the Anti- Commission Act passed Corruption Act, and ensure it is operational for at least 12 months leading up to the in Aug. 2008 and completion point. Commissioners confirmed by parliament Sept. 2008 . Commission operational Dec. 2008. 10 25. The low-income country debt sustainability analysis (LIC DSA) baseline scenario-- which assumes full delivery of traditional debt relief--reveals that Liberia is in debt distress, emphasizing the need for debt relief. Under the alternative LIC DSA scenario-- which assumes full delivery of debt relief from HIPC, the Multilateral Debt Reduction Initiative (MDRI), and IMF beyond-HIPC9 at completion point--Liberia's debt dynamics remain manageable, assuming moderate new borrowing, largely on concessional terms, and robust GDP growth. (See Annex 14 for detailed debt sustainability analysis). A preliminary update of the DSA (February 2009) shows an improvement in the long-run outlook relative to the decision point. The short-term projections for the NPV of debt-to-GDP and exports ratios have worsened, largely reflecting the impact of the financial crisis and the global slowdown on the prospects for GDP growth and exports in the short-term. However, increased interest in iron ore mining and commercial timber operations have led to improved prospects for growth and exports in the longer-term as the global economy improves. D. Poverty Profile 26. Liberia is one of the world's poorest countries. Current per capita GDP is estimated at US$190.10 Close to two thirds of the population lives below the national poverty line, and close to half of the population lives in extreme poverty (Table 3).11 Poverty is more prevalent in rural areas (where 68 percent of the people are in poverty and 56 percent in extreme poverty) than it is in towns and cities (where 55 percent of the people are in poverty and 29 percent in extreme poverty). Poverty shows itself in both low income and poor access to social services, resulting in poor health and education status. Table 3: Key Poverty and Social Indicators, 2007 Poverty (% below poverty line) 63.8 (% in extreme poverty) 47.9 Female literacy rate (%) 61 Net primary enrollment 37 Under-five mortality (per 1,000) Life expectancy at birth (years) 45 Children stunted (%) 39 Access to safe water 50 Access to improved sanitation 40 27. Life expectancy at birth is estimated at 45 years--below the average even for most fragile states. Preventable diseases such as malaria, diarrhea, respiratory infections, and measles are rife. Malnutrition is considered a key factor in high death rates, and 19 percent of children under five are underweight and 39 percent are stunted. Access to quality health services remains 9Liberia's debt to the IMF under the three-year PRGF/Extended Fund Facility will not be covered by MDRI since it will be contracted after the end-2004 MDRI cutoff date. "Beyond-HIPC" debt relief refers to the assistance necessary to reduce the value of the stock of qualifying debt to zero. 10International Monetary Fund, Macroeconomic Framework, 2007. 11Core Welfare Indicator Questionnaire 2007. 11 low. About half the population lacks access to safe water, and more than 60 percent have no access to improved sanitation facilities.12 An estimated 86 percent of the population was displaced during the civil war, and many have chosen not to return to their original communities but to remain in overcrowded and unsanitary slums, particularly in and around Monrovia. Access to education and training is limited, and net primary school enrollment is low, at 37 percent. 28. Women in Liberia remain disproportionately affected by poverty. They have fewer opportunities for education and employment, and suffer gender-based discrimination and violence. In particular, non-income dimensions of poverty affect women disproportionately. These include high fertility rates (5.2 children per woman and 6.2 children per woman in rural areas), high maternal mortality (between 774 and 994 deaths for 100,000 live births in 2000), high illiteracy (59 percent of women illiterate compared to 37.4 percent of men), and low access to education. And while Liberian women are very active in the labor market, their work is concentrated in the informal sector and may not put them on a sustained path of poverty reduction. 29. The causes of poor living conditions are rooted in pre-war inequities. As noted, Liberia's pre-war growth was concentrated in industrial mining and plantation production and highly inequitable. State resources were concentrated in Monrovia, and most infrastructure and basic services benefited only urban residents. 30. Liberia is unlikely to meet most of the Millennium Development Goals despite the country's commitment to achieve progress in them. The government projects a reduction in poverty "that is at least consistent with the spirit of the MDGs". It also expects that several sub- targets can be met. 31. Reliable poverty statistics for Liberia are difficult to come by, but the government is committed to producing basic social data over the three-year duration of the Poverty Reduction Strategy. The Core Welfare Indicator Questionnaire and the Demographic and Health Survey in 2007 provided considerable new data that helped to inform the PRS. In addition, a Comprehensive Food Security and Nutrition Survey in 2006 provided baseline data on food security and consumption. A national census was undertaken in March 2008. 32. The global economic slowdown is likely to hit the poorest the hardest. Liberia and its development partners need to focus on ensuring that the nearly two million people living below the national poverty line are afforded basic protection, that their livelihoods are sustained, and that their opportunities to enter the country's fledgling formal labor market continue to expand. 12Core Welfare Indicator Questionnaire 2007. 12 III. COUNTRY DEVELOPMENT PROGRAM AND ISSUES A. Country Priorities and Agenda 33. Liberia's first full Poverty Reduction Strategy sets out the government's priority agenda for April 2008 to June 2011. The PRS is based on the following four pillars that represent the core strategic areas of intervention: Peace and Security, Economic Revitalization, Governance and the Rule of Law, and Infrastructure and Basic Services. In addition, the PRS pursues a number of priority crosscutting themes, including gender equity, peace-building, environmental issues, HIV and AIDS, and children and youth. · Peace and Security. The main objective is "to create a secure and peaceful environment, both domestically and in the sub-region, that is conducive to sustainable, inclusive, and equitable growth and development." Government aims to rebuild national security institutions capable of assuming authority as the international peacekeeping force is drawn down. Emphasis is placed on reforming security institutions and training soldiers, police officers, and other personnel in the security sector, as well as building public confidence in the government's ability to maintain peace and security. · Economic Revitalization. The main objective is "to firmly establish a stable and secure environment and to be on an irreversible path towards rapid, inclusive, and sustainable growth and development." Growth will be led by the private sector, while the government will focus on reforming public institutions and processes in order to facilitate investment and strengthen market functions. Emphasis is placed on agriculture, as well as the traditional growth sectors of forestry and mining. · Strengthening Governance and Rule of Law. The main objective is "to work in partnership with all citizens to build and operate effective institutions and systems that will strengthen peace and promote and uphold democratic governance, accountability, and justice for all." The government plans to develop a decentralization policy, work to curb corruption, reach out to civil society, and undertake public sector reform, including civil service and judicial reform. · Infrastructure and Basic Services. The main objective is "to embark on the rehabilitation of infrastructure and the rebuilding of systems to deliver basic services in order to create the conditions and linkages needed to achieve broad-based growth and poverty reduction". Priority areas identified through stakeholder consultations are the rehabilitation of roads, water supply, and sanitation, as well as improvements in health and educational services. Main priorities include: roads and bridges, energy infrastructure, transport facilities, and water and sanitation systems, financed over time with significant private sector participation. 13 B. Structural and Sectoral Development and Challenges Infrastructure 34. Rehabilitation of infrastructure remains Liberia's greatest post-war challenge. During the war the extensive destruction of basic infrastructure, coupled with lack of maintenance, contributed to the collapse of productive activities and a reversion essentially to a subsistence economy. The transport infrastructure base needs to be rebuilt: most of the country's 10,000 km of existing roads are in extreme disrepair, and often impassable during the rainy season, and the airport and seaport are dilapidated and poorly organized, severely hampering international commerce. There is very little electricity generation. Urban infrastructure requires significant investments. Major public services were discontinued during the war and need to be reestablished, including solid waste collection and the development of a landfill, and restoration of water and sewerage facilities. Needs for information and communications technology are enormous. 35. Clearly, Liberia's infrastructure needs far outweigh available funds and implementation capacity. Part of the solution will be to seek regional collaborative approaches that can lower costs, such as those used by the West African Power Pool, or to take advantage of private sector investments, such as roads developed by mining companies; or to structure public- private partnerships, such as in urban water supply in other West African countries. The PRS sets out a prioritized program of interventions, targeting selected activities in transport, energy, water, and sanitation leading to the development of long-term sector strategies. Agriculture and natural resources 36. Agriculture. Agriculture is Liberia's main source of livelihood and employs 70 percent of the people who have jobs. Recovery from conflict has been quicker in the commercial plantation sector, where high world prices for rubber and palm oil have spurred investment. But ensuring balanced growth in agriculture will be critical for sustained peace. Most of the country's households reverted to subsistence farming during the war, and the challenge now is to boost their marketable surplus. The major needs for revitalizing agriculture, as recognized in the PRS, are: to increase yields and production in key cash and export crops from both the smallholder and commercial/plantation sectors; to support improved value chains, including more efficient supply chains and more opportunity for value addition and off-farm employment; to enhance food security by stimulating food crop production; and to build the capacity of the Ministry of Agriculture and other institutions to plan and monitor outcomes in the sector.13 This includes the need to ensure that women--who make up more than half the people engaged in agriculture--obtain equal access to resources, training, and services. Reforming Liberia's outdated dual land tenure system--formal and customary--will also play a major part in boosting agriculture. 13These needs were identified by the Comprehensive Agricultural Assessment and Strategy (CAAS-Lib), supported by FAO and the World Bank. 14 37. Mining. Though most commercial mining activities ceased during the civil war, the mining sector has a large potential for rapid growth and poverty reduction in the medium to long term. Large-scale iron mining has historically been one of Liberia's main sources of growth (four large iron-ore concessions contributed about 25 percent of GDP and 64 percent of exports in the mid-1970s), and a significant artisanal and small-scale mining sector, mainly in diamonds and gold, employs an estimated 100,000 people. Since 2006, the government has shown a commitment to reforming the mineral sector. It has reviewed and renegotiated concessions that were signed during the National Transitional Government period, launched the Kimberly Process in 2007, and worked towards a revision of the legal and policy framework for mining--through the development of a draft Mineral Policy and a draft model Mineral Development Agreement, with draft fiscal terms and conditions for mining and petroleum to be incorporated into legislation. Liberia has also made progress towards implementing the Extractive Industries Transparency Initiative (EITI).14 Liberia quickly reached EITI candidacy stage and is currently working towards producing its first EITI report. The ADB and the World Bank are collaborating to help the government implement the Initiative. 38. Forestry. Historically, efforts to convert Liberia's natural forest capital into monetized growth have led to growth without development: the so-called "resource curse". Liberia lies at the heart of the Upper Guinea Forest Biodiversity Hotspot, which is one of 35 such critical areas worldwide for biodiversity conservation. Forests in this region have been reduced to an estimated 14 percent of their original extent, with Liberia retaining 43 percent of what remains. Thus Liberia's actions will be critical to successful conservation in the region. The government has decided to include the forestry sector, in addition to mining and petroleum, in EITI (see previous paragraph), and the PRSP and the new Forestry Law reflect a consensus strategy for more balanced and integrated development of the country's forests. Putting the strategy into practice will require conservation measures (also as a means of carbon storage) and sustainable management of the forest and secondary processing of forest products, so that forestry can make a lasting contribution to economic growth. As well as respecting environmental considerations, the challenge is to encourage pro-poor growth based on: (i) sharing with communities the benefits of revenues from commercial concessions; (ii) providing opportunities for meaningful participation in value-chains; and (iii) sharing equity in productive forest resources. Given the direction of policy and legislation towards recognition of community rights on forest lands, there is also an emerging need to avoid land-use conflict by developing opportunities for synergy between small-scale producers and commercial companies. Human Development 39. Improving human development outcomes remains a daunting challenge. Since the end of the war, the government has sought to improve basic education and health. Ultimately, Liberia will need to balance short-term needs in health, education, and social protection, using a consolidated approach to delivering basic human services and a long-term strategy towards social protection and risk management. 14This global initiative supports improved governance in resource-rich countries through the verification and full publication of company payments and government revenues from oil, gas, and mining. 15 40. Education. Wide disparities exist in enrollment, dropout, and survival rates by economic status, gender, and location. Education is provided by a combination of private, church-owned, community-based, and public schools with little government oversight. A rise in the gross primary enrollment rate to a relatively high 87 percent suggests that older children who missed being educated during the war are returning to school. Most of the children in school are older than the intended age range for the grade they are attending and schools remain overcrowded. Dropout rates are high and less than one in five children proceeds to secondary school. The government's recently introduced Primary Education Recovery Program (LPERP) is the initial step towards a full sector plan and setting up an administrative and financing framework. It aims to improve the organization and management of physical and human resources, curriculum, and teaching programs, and to supervise the quality of teaching and learning in both public and private schools. 41. Health. Filling gaps left by wartime relief agencies is critical to avoid a collapse of the health sector. For example, fewer than 170 doctors are now practicing in this country of more than 3 million people. The government's newly formed National Health Policy calls for a two- pronged approach: (i) strengthening the delivery and management of an equitable, effective, efficient, responsive, and sustainable health care system; and (ii) securing and expanding access to basic health care of acceptable quality. 42. Social Protection is fragmented and under-resourced. Since the conflict ended, the social protection agenda has been driven by a series of often-uncoordinated activities financed by donors and executed mainly by international NGOs. Without structured policies for social protection, a community-based approach to managing risks and protecting the most vulnerable people remains viable in the short run. Priorities at the community level include provision of basic services; food security measures (including community-based agro-processing); and efforts to create jobs and means of livelihood. Over the longer term, the government will need to develop a social protection strategy that integrates local government, community development, and protection for the poorest and most vulnerable populations and that adequately addresses the different sources of vulnerability of various population groups.15 Private Sector Development 43. Private sector growth, if equitable, is poised to be the main engine of Liberia's post- war recovery. To achieve growth and create jobs on the broad scale that is needed, a dynamic small and medium enterprise sector will be essential. At present, however, entrepreneurship is weak in Liberia. Except for a few major companies such as Arcelor Mittal and Firestone, most businesses are small and informal, with low production capacity. There are no reliable business support services. The most prevalent SME support institutions are public institutions with mixed track records, a weak skills/knowledge base, dependence on government funding, and limited 15For example, a recent World Bank assessment underscores the complexity and multiplicity of risks that certain groups, such as adolescent girls, face in Liberia, making them a priority group of poor people that a social protection strategy should target. See Ruiz Abril, M.E., "Girls' Vulnerability Assessment, background report for the preparation of the Women's and Adolescent Girls Economic Empowerment Project," June 2008. World Bank: Monrovia. 16 potential for efficient operations. Poor infrastructure (energy, roads, and telecommunications) compounds the difficulties. 44. Important aspects of a basic financial infrastructure, such as market instruments for the conduct of monetary policy and an interbank payment system, have yet to be established. The legal and regulatory framework for collateralized lending needs to be developed and the legal framework to facilitate the collection of debts and enforcement of financial contracts need strengthening. Overall confidence in the financial system could be enhanced by building the capacity of the Central Bank for regulation and supervision and by developing processes for sharing information on creditworthiness. The market for long-term capital is yet to be developed and there are no effective vehicles for contractual savings and collective investment aside from the National Social Security and Welfare Corporation. 45. Despite the challenges, the government is committed to private sector-led growth. This focuses particularly on the enabling environment for the private sector, including macroeconomic stability, tax and tariff reforms, a clear legislative framework, and transparency in business dealings. Between 2007 and 2008, a number of reforms made starting a business and starting a construction project faster and easier, facilitated access to credit, and encouraged cross- border trade. On the ease of doing business, Liberia was ranked 157 out of 181 economies in 2008, up from 170 out of 178 the previous year.16 46. IFC has been assisting with private sector development and investment climate issues that affect private sector growth and access to finance, including through trade finance lines and equity, debt and technical assistance in the development of a commercial microfinance bank. The African Development Bank, through its private sector window and in collaboration with IFC and other partners, is providing equity and technical assistance support to the financial services sector with a view to providing finance to micro, small, and medium-size clients in Liberia. To further strengthen the investment climate, Liberia will need assistance to develop the financial sector; streamline the regulatory framework for businesses; continue its tax reform efforts, including alignment with the ECOWAS Common External Tariff; and invest in infrastructure, including roads, port facilities, telecommunications, and energy provision. In addition, regional issues loom large, given Liberia's small economy and the existence of cross- border issues including security, energy, agricultural trade, and common natural resources such as fisheries. C. Governance and Anti-Corruption Efforts 47. Addressing weak governance structures and building effective and efficient public institutions is a significant challenge facing Liberia's development, including advancing the Public Sector Reform agenda. Areas with particularly weak capacity include: (i) the Civil Service Agency; (ii) the public financial management system; (iii) the Judicial Training Institute, and (iv) the Governance Commission. Decentralizing power and engaging citizen participation are also at the forefront of governance related concerns, including building local 16Doing Business Report 2008 and 2009. 17 capacity and effective links between the Central Government and Counties and Districts. Liberia also seeks to establish better inter-ministry relations through a "joined-up government" as well as enhance the coordination between the Executive branch, Legislature and Judiciary. With regard to anticorruption efforts, Liberia needs to build national integrity system and oversight mechanisms and actually implement anticorruption strategies throughout the state (i.e. embedding the Anticorruption strategy at all levels). Public Sector Reform 48. Civil Service Reform. Some progress has been made in reforming the dysfunctional and bloated civil service that the new government inherited after the war. The government has developed a civil service reform strategy. Some of the salary arrears to public servants have been cleared and there have been three modest increases in basic pay (though salaries remain very low and highly compressed). A large number of ghosts have been eliminated from the civil service payroll, which is now down from 42,000 to 35,000. The Liberia Institute of Public Administration is now operating in rehabilitated premises, a Senior Executive Service has been launched, and several ministries have begun their own restructuring programs. A remaining challenge is to narrow the gender gaps in the civil service; only about one in five public sector employees are women.17 49. Rule of law is one of the main pillars of the Government's PRSP, but it remains one of the weakest areas of state capacity. The justice system--from investigation to prosecution and sanction or enforcement of judgments--is plagued by corruption and inadequate capacity and impunity is too often the norm rather than the exception. The functions of the national police are not clearly defined (vis-à-vis military police), and there is a serious imbalance between prosecutors and public defense. Judges are poorly trained, numerous magistrates are not law school graduates, and courtrooms are not functioning. Key areas in the PRSP include: (i) expanding access to justice; (ii) strengthening and promoting human rights; (iii) reviewing laws and the constitution; (iv) integrating and enhancing traditional justice systems; and (v) delivering justice to especially vulnerable groups. In addition, a major World Bank analytic piece on land reform indicates the need for urgently working to catalog and administer existing land records, build capacity to put a land tenure system in place, and develop a transparent system by which land disputes can be adjudicated. Public Financial Management 50. Economic governance issues have been a key driver of conflict in Liberia and vested interests remain entrenched in the public sector. Robust diagnostics of the quality of governance are scarce, but the 2006 Global Integrity Report18 rated Liberia as "very weak" on four of six indicators. Liberia continues to score poorly on Transparency International's Corruption Perception Index (2.1 out of 10 in 2007). 17Liberia Institute for Statistics and Geo-information Services (LISGIS). 2005. National Census of the Liberian Civil Service. Monrovia: LISGIS. 18See Global Integrity 2006 Report at . 18 51. However, progress made since 2006 is commendable. The World Bank Institute's most recent Worldwide Governance Indicators reflects a strong improvement in Liberia's index of "control of corruption". Liberia adopted (in December 2006) a national anti-corruption policy and strategic framework, and has passed a law for the creation of an Anti-Corruption Commission with prosecutorial powers. The World Bank's most recent Post-Conflict Performance Indicators rated Liberia 3.3 (on a six-point scale) on public sector management and institutional performance, up from 2.3 the previous year. Similarly, Liberia showed an improvement in public sector management and institutional performance under the African Development Bank's Country Policy and Institutional Assessment, from 3.4 in 2006 to 3.5 in 2007. 52. Financial management reforms in particular show that the current government is firmly committed to governance reform over the long term. As described in Chapter II above, the government has put cash management controls in place, maintained a balanced cash- based budget, and restored transparency to the budget process. It achieved most of its objectives under two IMF staff-monitored programs, which focused on strengthening public financial management and the domestic financial sector and implementing anticorruption and domestic debt resolution strategies. It has also introduced regular fiscal reporting, enacted and implemented a new procurement law, and introduced better financial controls in key state-owned enterprises. 53. Further work on public financial management is needed, including making the budget more effective. A public expenditure management and financial accountability review (PEMFAR) undertaken by the World Bank, ADB, and IMF proposes a framework for further reforming PFM and procurement, building robust audit functions, and anti-corruption measures. Success under these reforms will form the basis for phasing out the GEMAP during the CAS period (by the HIPC completion point in 2010). Next steps also include work on fiscal deconcentration and building demand-side accountability on governance. 54. As the government's structures and implementation capacity for public financial management improve, donors' scope increases for channeling their aid through Liberia's budget. Direct budget support allows governments to more easily forecast aid inflows, aligns aid resources to their policy priorities, and pursues more economically efficient and scaled-up solutions to problems. Only a small part of the aid to Liberia takes the form of budget support at present. To provide increased assurance to donors, the government will need to continue its PFM reforms and sustain its strong performance under the Poverty Reduction and Growth Facility, so as to show it can effectively use increased donor resources through the budget. D. Cross-Cutting and Other Issues Capacity Building 55. Capacity is the binding constraint on Liberia's reconstruction and development. The widespread brain drain that took place during the civil war left the country largely bereft of skilled people, hampering reconstruction and reform efforts at all levels. 19 Ministries lack capacity to implement development projects, and the private sector finds it difficult to recruit qualified people. Should employment opportunities pick up in the private business sector there is a risk that few qualified applicants will be available. Capacity building needs to be pursued in every sector at all levels, including by rebuilding the technical skills base, building implementation capacity, rebuilding state administrative capacity, and addressing the environment and incentives that make for effective capacity development. Over the longer term Liberia will need to address its critical shortage of training organizations, whether by reviving some that existed before the war or by establishing new ones, such as a school for training in project management, financial management, and monitoring and evaluation. 56. Under the PRS, the government is tackling the need to build capacity on several fronts. These include: a Senior Executive Service program to get qualified Liberians into the management levels of the civil service; revitalization of the Liberian Institute for Public Administration to train mid-level civil servants; a Financial Management Training School to train certified financial accountants to staff key ministries; and the Ministry of Finance's accelerated education programs for young adults, among other measures. It is working to build public implementation capacity for large infrastructure projects, and is taking steps to encourage private sector development. There is also a need to address the dire shortage of skills required in the private sector. For the medium term, the government is working on a capacity development plan to address critical needs across all of these areas. Gender Issues 57. Though significant legislative and policy advances have been made since the end of the war, women still lack access to productive resources and to equal opportunities and participation in management and decision making at all levels of society. Their participation in political leadership and decision making remains low, with only 14 percent representation in the legislature (2007), 0.8 percent in the judiciary (2005), 5.3 percent in government bureaus and agencies (2005), and 10.3 percent in ministries (2005). Most important, gender-based violence is a serious problem in Liberia affecting women's and girls' ability to lead a safe life (PRSP, 2008). Domestic violence is endemic, and rape remained the most reported crime in Liberia in 2006. Gender issues will require a strong policy response in the next few years, and, in the context of limited capacity, strengthening the government's ability to undertake gender-aware policy formulation will be essential. Trade Development 58. The development of trade and export-led growth is critical to Liberia's recovery. Much of the country's export base was eroded during the war, as noted earlier, so that the main exports today are rubber and scrap metal. Liberia has large potential for growth in mining, agriculture (particularly in tree-crops such as rubber, oil palm, and cocoa), fisheries, and forest products, but a prudent policy framework must be put in place to ensure that growth is equitable and sustainable, and that it is environmentally responsible. Basic elements of the needed framework include concession agreements that secure a fair share of the rents for government, prudent management of tax revenues and royalties, an improved investment climate, and market- 20 friendly approaches to promote employment of poor people, including women in largely male- dominated export sectors.19 Environmental sustainability 59. Liberia retains an important area of the endangered Guinean Forest Ecosystem, and its coastal waters and uplands are rich sources of biodiversity. Its abundant natural resources have enormous economic potential, making the sustainability of these resources a primary issue for the government. At the same time, Liberia also faces potential natural disasters from climate-related hazards, including floods, landslides, excessively high temperatures, drought, windstorms, and coastal erosion following sea level rise. Data are insufficient either to establish a baseline or to assess whether Liberia will meet the MDG on environmental sustainability. At the same time, the government's capacity to monitor progress is weak. The government is nonetheless committed to addressing environmental issues and has made some progress since 2003. It has developed a National Environmental Policy and adopted two major environmental laws--the Environmental Protection and Management Law and the Environmental Protection Agency Act--as well as the new Forestry Law noted earlier. The Environmental Protection Agency became fully functional in 2006. The World Bank has carried out training programs in the EPA and the Forest Development Authority on environmental impact assessment, strategic environmental assessment, social assessment, the resettlement framework, process framework, and participatory strategies for infrastructure, mining, and forestry-related investments. Regional Integration 60. Liberia has a keen interest in regional integration, being aware that national efforts alone will have great difficulty achieving the rapid, inclusive, and sustainable economic growth that is needed.20 Its own battered economy is small, and its resources very limited. Better physical connectivity with neighboring countries will be critical for accessing regional and global markets and thereby diversifying its economy. Additional growth opportunities could be unlocked through regional approaches to the management of a number of important shared resources (fisheries, the Mano river basin) and trans-boundary development challenges (conflicts, infectious diseases, and the potential negative environmental, social, and economic impacts of mining development). In particular, building a stronger and more competitive agriculture will require collaborative efforts with neighboring countries in agricultural research and the dissemination of new technologies. The potential of the mining sector for economic growth and poverty reduction can be more fully exploited through regional collaboration to harmonize regulatory frameworks and fiscal regimes; contain negative transboundary impacts; and develop economic clusters and networks of energy and transport infrastructure catalyzed by mineral investments. 19See the recent World Bank-led Diagnostic Trade Integration Study (DTIS). 20Growth that comes from a more dynamic agriculture sector, labor-intensive manufactured and services exports that promotes jobs for low-skilled workers, and less dependency on primary products and extractive industries over time. 21 IV. IMPLEMENTATION OF THE INTERIM STRATEGY AND LESSONS LEARNED 61. As Liberia moved rapidly from civil war to the founding of a functioning and successful state, the World Bank Group/ADB responded with an Interim Strategy for the period July 2007 to June 2008. The Joint Interim Strategy Note (ISN) of June 2007 set out a three-pronged approach that was fully consistent with the government's Interim Poverty Reduction Strategy and focused on: (i) revitalizing the economy; (ii) strengthening governance and the rule of law; (iii) rehabilitating infrastructure and delivering basic services. The components of the Interim Strategy were designed to help rebuild state capacity, ensure visible impact, and coordinate closely with the activities of other donors. 62. Overall implementation of the Interim Strategy has been satisfactory. Both the World Bank Group and ADB have maintained a consistent engagement in Liberia, leading the donor community in their core areas of expertise: economic governance, community-driven development (World Bank only), and infrastructure rehabilitation. Despite the significant constraints that are posed by lack of capacity, uneven governance, and implementation difficulties, the World Bank Group program has begun to deliver results. The African Development Bank program introduced under the Interim Strategy is largely in place, and intermediate results will be tangible during the CAS period. 63. The ISN implementation has yielded some important lessons: · Respect Liberia's limited implementation capacity. Implementation capacity is the defining barrier to rapid development in Liberia. Both the banks have found it a challenge to implement their existing portfolios, not only because of counterparts' weak capacity for project management but also because of difficulties in attracting qualified bidders for works. Though the government has a strong reformist bent, the country's almost total lack of technical capacity has left much of the burden of implementation on bank teams. During the ISN period, a rapid scale-up of implementation capacity in two Liberian agencies--the Ministry of Public Works and the Liberia Agency for Community Empowerment (LACE)--provided the foundation for the approval of eight World Bank emergency operations. These two agencies had the most promising implementation capacity, but they are already overstretched and will need sustained support to keep up with increasing demands. The ADB Institutional Support project, aiming to rebuild national capacity in the areas of good governance and economic management, was approved in late 2006 but did not become effective until April 2008, for lack of implementation capacity; thus far, it has made just one disbursement. Out of four operations approved in late 2007-early 2008, only two other ADB projects have just recently made their first disbursements. · Consolidate interventions and keep to the principle of strategic selectivity. Up to now, the World Bank Group has spread itself thinly in Liberia. As one of the most active donors since the peace accord, it has created high expectations that far outrun its program resources and staff capacity. Going forward, it must be more selective and better 22 leverage a full range of resources, including those of the IFC, multi-donor trust funds, and co-financing with other donors. The African Development Bank's support since the peace accord has focused mainly on infrastructure and governance reform. Consistent with the ADF-11 operational priorities and the Bank's strategy for enhanced engagement in fragile states, ADB will continue and build on its ongoing operations and will also reengage in lending to Liberia's main productive sectors--particularly agriculture, and potentially mining. · Build capacity for portfolio management and strengthen project-level monitoring and evaluation. The current Liberian portfolios of both banks are very young. The World Bank's six active IDA projects are only about one year old, on average, and 90 percent of them are rated satisfactory thus far. The ADB's five active projects have an average age of four months (from effectiveness date); one project is rated satisfactory while others have not been rated yet. A detailed review by the World Bank of its portfolio M&E arrangements found weaknesses in the articulation and implementation of project results frameworks, ranging from unclear formulation of project development objectives to lack of baseline and target data. During the CAS period, a stronger emphasis will be put on monitoring and evaluation to ensure that operations are on track to deliver expected outcomes. The ADB is increasing its field presence through the Sierra Leone Field Office with a view to enhancing its portfolio management and capacity building efforts. V. WORLD BANK GROUP AND AFRICAN DEVELOPEMT BANK GROUP ASSISTANCE STRATEGY A. Principles for World Bank Group and African Development Bank Group Engagement in Liberia 64. Align with the government's Poverty Reduction Strategy. The overarching aim of the Joint Country Assistance Strategy (CAS) of the World Bank Group and the ADB Group is to support Liberia's transition from post-conflict recovery to long-term development. The strategy addresses some key constraints on growth as well as enhancing the policy and institutional framework to ensure that growth is increasingly pro-poor. It is fully aligned with the pillars and objectives set out in Liberia's PRSP. The CAS will pursue three strategic themes: (i) rebuilding core state functions and institutions; (ii) rehabilitating infrastructure to jump-start economic growth; and (iii) facilitating pro-poor growth. These themes are fully aligned with pillars II, III, and IV of the Poverty Reduction Strategy. The CAS will also focus on the crosscutting objective of capacity development. Gender and the environment are important elements of the strategy that will be increasingly mainstreamed into World Bank and ADB programs. 65. Focus on selectivity and achieving results. The focus of the CAS is selective, given Liberia's limited implementation capacity. Most of the CAS results will be generated from existing projects ­ which spanned a wide range of sectors during the reengagement period. New 23 projects are carefully targeted, largely avoiding entry into new sectors. The choice of activities is consistent with the comparative advantages of both banks as well as the leadership of other donors in certain thematic areas, and with the government's expressed wish to focus of the bulk of investment finance on rebuilding transport and other infrastructure. The two banks will work with government and to ensure that they are working in a harmonized and coordinated way with the donor community, across all PRS priorities. 66. Mainstream principles of good governance at both the country program and the operational level. The CAS includes a strong core governance program, focusing heavily on helping Liberia rebuild its public financial management capacity, as well as its institutional and human resource capacity in the civil service. At the operational level, the World Bank will continue to work to ensure that, despite enormous capacity constraints, robust fiduciary standards are maintained. The CAS program incorporates the building of implementation capacity in all projects, as well as providing for intensive supervision and monitoring and evaluation support. 67. Make choices that are consistent with a regional integration perspective, given the government's key interest in achieving the benefits from regional integration. The ADB and other development partners are committed to supporting efforts to increase regional cooperation and dialogue through, for example, the World Bank's dialogue in Liberia's neighboring countries, World Bank and ADB participation in the International Contact Group for the Mano River Union, and the ADB's upcoming Regional Integration Assistance Strategy for West Africa. B. Expected Outcomes 68. Figure 1 illustrates the strategic themes and expected key outcomes of the Joint Strategy (Annex 1 shows the complete results framework). Theme 1: Rebuilding core state functions and institutions 69. The CAS will help Liberia to continue to implement a robust governance reform program. The World Bank and the ADBs work focuses specifically on further strengthening the core public financial management system and reforming and modernizing the civil service. This work is critical for rebuilding Liberia's shattered state institutions, ensuring that the country can bring manage its own resource flows transparently, bring aid on budget, and greatly increase its human capacity to carry out core state functions. Much progress has been made in these areas over the past year under the two banks' Interim Strategy and this work will continue through the CAS period. 24 Figure 1: CAS Strategic Themes and Outcomes Regional Integration Rebuilding core state Rehabilitating Facilitating Pro-poor functions and infrastructure to jump- Growth 1. Improved agricultural and institutions start economic growth natural resource 1. Improved efficiency of 1. Improved access to key management in a way that budget preparation and infrastructure services generates pro-poor growth execution and enhanced 2. Improved business and revenue administration investment climate 2. Increased 3. Increased access to professionalization and social protection and social improved HR management, services in the face of of the civil service shocks Capacity Development CAS Outcome 1: Improved efficiency of budget preparation and execution and enhanced revenue administration 70. Public Financial Management. The World Bank and the African Development Bank will provide continued complementary support to strengthen public financial management and help begin the task of fiscal deconcentration, mainly through technical assistance and policy based budget support operations. The World Bank's Economic Governance and Institutional Reform Project (EGIRP--US$11 million) and Development Policy Operation (US$15 million) will be harmonized with the ADB's budget support operations of an indicative amount of US$32.7 million (including US$4.7 million from the African Food Crisis Response). These operations cover the three-year period of the CAS and focus on consolidating and extending existing work on public financial management and procurement reform. Specifically, they will: (i) support implementation of the proposed Public Financial Management Law and regulations and strengthen financial management training programs; (ii) support the strengthening of capacity for macro-fiscal analysis (including gender analysis), budget preparation, and execution; (iii) provide technical assistance on public procurement reforms, including support for the Public Procurement and Concessions Commission and key ministries and agencies; (iv) consolidate and strengthen the tax and customs administration reform efforts by implementing a new computerized Integrated Tax Administration System and a new customs administration system; (v) support the training and equipping of a new team of auditors within the General Auditing Commission in order to strengthen the government's external audit function; (vi) strengthen the capacity of the Ways and Means Committees to ensure proper scrutiny of the execution of the budget; and (vii) support government's measures to limit the social impact of rising food prices.. These programs support the central elements of the government's macroeconomic strategy to 25 provide the foundation for rapid, inclusive, and sustainable growth. They will help the government apply sound policies that foster competition, maintain price stability, create employment opportunities, and encourage private sector investment. In addition, analytic and other work will be initiated to help inform the Government's decentralization process, which may include fiscal decentralization. The World Bank is working with the IMF on a fiscal decentralization study which will help to inform the Governments' long term strategy in this area. Work will continue to build up local financial management capacity in the Ministry of Finance, through a variety of capacity building interventions, including the Bank-supported Liberia Institute for Public Administration. Finally, work will be continued to foster demand- driven governance and accountability, particularly through continued support to the Liberia EITI program, which provides a platform for dialogue and capacity building of civil society groups such as the National Traditional Council and the Publish What You Pay Coalition, with a particular focus on transparency within the extractive industries area. The World Bank will also explore pilot social accountability activities around some of its own projects. CAS Outcome 2: Increased professionalization and improved HR management of the civil service 71. Civil Service Reform. The World Bank will continue to provide implementation support for the government's civil service reform strategy. This is supported by three ongoing operations including: (i) a LICUS Trust Fund Grant of US$900,000 focusing on analytic work (e.g. development of a pay and employment strategy and organizational reviews) and capacity building for the Civil Service Agency and the Liberia Institute of Public Administration; (ii) a Trust Fund for Liberia grant of US$2.3 million supporting the Senior Executive Service, which aims to help fill the major capacity gap that exists in key ministries at the level immediately below ministers; and (iii) the Economic Governance and Institutional Reform Project which supports the development of a human resources and payroll module within the integrated financial management and information system. These projects complement DfID's Civil Service Capacity Building program and the work of other donors, including UNDP and USAID. Theme 2: Rehabilitating infrastructure to jump-start economic growth 72. Faced with the huge investment needs in infrastructure, the government has indicated that its preferred use of lending from the World Bank and ADB is for roads, agricultural infrastructure, and water supply and sanitation. This is due to the high priority of these facilities in the Poverty Reduction Strategy and difficulties in attracting investments for them from other sources. CAS Outcome 3: Improved access to key infrastructure services 73. Transport. The World Bank will lead in supporting the rehabilitation of roads and bridges to connect critical parts of the country. A series of emergency infrastructure programs, financed by IDA and the Liberia Reconstruction and Development Trust Fund--a new multi- donor trust fund for infrastructure administered by the World Bank--will continue with a new program totaling US$85 million (US$53.2 million in FY09 million in FY09 and the remainder in 26 outer years). This will support the rehabilitation of Monrovia streets, a pilot road-resurfacing program that could be scaled up in future projects, and a first portion of two major roads that would be completed potentially under the LRTF. The World Bank will also help develop the institutional capacity to manage the sector and develop the Special Implementation Unit of the Ministry of Public Works into a fully professional infrastructure implementation unit, the Infrastructure Implementation Unit, which would then be phased into a Road Authority as other line ministries acquire the capacity to carry out their own infrastructure projects. Associated with this support would be a move towards achieving sustainable financing for routine and periodic maintenance of the road network through establishment of a Road Maintenance Fund. In line with government priorities and the widespread need for social protection, many works will be done using labor-intensive methods. The World Bank support will also focus on improving the infrastructure and management efficiency of the Monrovia port. The ADB's ongoing labor-based public works project will rehabilitate the Fishtown-Harper road, construct drainage points and bridges, and rehabilitate selected schools and health facilities. It will also build capacity within the Ministry of Public Works for infrastructure maintenance using labor- based methods. A significant component of ADB's proposed agricultural sector project is the construction and rehabilitation of rural and feeder roads, irrigation, and social infrastructure, as well as capacity building within the Ministry of Agriculture. Finally, the CAS will continue facilitating the private-sector-led rehabilitation of the port of Monrovia--a key access point for Liberia's international trade. 74. Water and sanitation. The ADB will lead the CAS financial support and advisory services for this sector. The interventions aim to increase the volume of water supply in Monrovia and some rural areas and to strengthen the responsible line ministries' ability to take on these functions. Ongoing operations consist of the ADB/DfID/WB Monrovia Water Supply and Sanitation Rehabilitation Program and the White Plains Water Treatment Plant Rehabilitation Project. Under the CAS, the ADB will finance the Monrovia Expansion and Rehabilitation of Three County Capitals' Water Supply and Sanitation project. The design study for this project is ongoing. The ADB's proposed agriculture sector project includes a significant water management/irrigation infrastructure component. 75. Energy. CAS support for energy will concentrate on electric power supply; the World Bank and IFC together are supporting efforts to get electricity up and running in Monrovia and key rural areas. The challenges are immense, given the low starting base, and expectations of results should remain modest for the CAS period. As lead adviser to the government, the IFC will help select a private operator to develop, operate and manage an integrated electricity system for Monrovia; it will advise on the preparation, design, and implementation of a transparent competitive tender process for this purpose. The type and scope of private sector participation in developing and financing the electricity system will be influenced by a number of factors, including government sector policy and decisions on market structure, transaction structure, and regulation; issues surrounding cost recovery, tariff levels, tariff affordability, and the government's willingness to charge market tariffs; availability and level of donor grants for capital expenditure which would reduce the required tariff level; and the ability of private operators to raise necessary private financing in a downturn.. In addition, to enhance the 27 understanding of key energy sector development issues and improve and inform the public policy, reforms and investment decision framework necessary to jump start the sector, the World Bank Group will carry out a study of Liberia's energy sector in collaboration with the Government of Liberia and other Liberian stakeholders. To provide a comprehensive picture, the review will cover three key areas to be developed over the period of the CAS: (i) development of the electricity sector and regional integration; (ii) the petroleum sector; and (iii) rural energy access and development. The World Bank Group will also provide technical expertise for bringing modern energy services to rural areas and assist the realization of the West Africa Power Pool (WAPP) priority regional project. 76. Urban Development. The World Bank will continue to assist urban development, slum upgrading, capacity building, and decentralization and to provide supporting policy advice. As well as the investments in improving Monrovia's streets, mentioned above, efforts will be made to sustain earlier emergency work in the area of solid waste collection, and the government is exploring a financing mechanism to gradually assume the cost of collection. Ongoing support to identify a suitable site for a permanent landfill for Monrovia will continue. Efforts to improve municipal revenue collections, introduce financial controls, consolidate operations, and build capacity at the sub-national level remain of prime importance. Theme 3: Facilitating Pro-Poor Growth CAS Outcome 4: Improve agriculture and natural resources management in ways that generate pro-poor growth 77. A key part of the CAS addresses needs in agriculture and natural resources management, which have been important traditional sources of growth. Lending and non- lending services seek to restore and improve productivity in these sectors, with an emphasis on jobs and incomes for poor workers and producers and on environmental sustainability. 78. Agriculture. Liberia's high poverty rates, low post-war productivity in agriculture, and dependence on imported food mean that the world food price crisis has taken a heavy toll on many of its people. The two banks have responded with social protection programs, as described later in this chapter. Going forward, Liberia needs not only to increase its domestic food production but also to raise productivity and achieve sustainability of supply in its export crops, which are a major source of jobs, income, and foreign exchange. 79. The World Bank Group will focus on improving agricultural productivity and production. The Agriculture and Infrastructure Development Project (US$5 million component) supports food crop and smallholder tree crop production for export. Additional financing has been provided under the World Bank's Food Price Crisis Response Program to expand food crop production and to support quick-impact interventions to improve post-harvest infrastructure for the current planting season. The project will also establish local seed multiplication facilities to produce around 1,000 metric tons of certified seed. IFC is providing technical assistance in the agribusiness sector, and is considering several opportunities in tree crop investments. The Foreign Investment Advisory Service (IFC and MIGA) is providing technical assistance for a 28 model concession contract for tree crops. Following from the recommendations of the DTIS, IFC and the World Bank will support the Government to design a national outgrower program for oil palm and rubber sectors to leverage FDI and promote a more inclusive plantation sector. The World Bank is also supporting the policy capacity of the Ministry of Agriculture and will work toward improving market access through the reconstruction of rural roads. 80. The ADB's Agriculture Sector Rehabilitation project (indicative UA 12 million or US$19 million) aims to revamp the rice value chain, rice being Liberia's main staple food. The project aims to increase agricultural productivity and income of small and medium scale farmers through the rehabilitation and reconstruction of rural feeder roads, storage, processing and marketing facilities, and water management/irrigation infrastructure for swamp rice cultivation, as well as increased extension and input support for production of crops. This project has an indicative infrastructure component of over 80 percent. The project will also support sector-specific capacity building efforts. In addition, the African Development Bank will provide financing of UA3.0 million (US$4.7 million) under the Africa Food Crisis Response (AFCR) as part of budget support in 2008. The government intends to use the AFCR funds for fertilizers, crop protection, and dissemination of the New Rice for Africa, and related activities which will ensure efficient implementation of subsequent medium-term food security interventions. 81. Forestry. The World Bank will continue its analytical and advisory work under the multi-donor Liberia Forestry Initiative supported by a US$2 million grant from the Trust Fund for Liberia. This uses a "three C's" approach to forestry (commercial, conservation, and communities, with carbon financing cutting across all three), to achieve accountability, transparency, security, social responsibility, implementation of Liberia's new Forestry Law, and drafting of a community rights law. Public investments in forestry are currently financed by other donors and by tax revenues from logging. In addition, GEF grants totaling US$1.7 million are supporting conservation and biodiversity efforts. 82. Mining. Both industrial and small-scale artisanal mining are potentially important sources of growth and poverty reduction in Liberia, and both banks will contribute support in this sector. The World Bank Group expects to remain involved mainly on the governance front, through existing interventions such as the Economic Governance and Institutional Reform Project (EGIRP) and technical assistance under a regional mining initiative The projects will focus on assisting the government to identify ways and implement selected reforms to (i) promote and develop large-scale industrial mining as a source of substantial revenues and regional economic development; and (ii) develop and organize small-scale and artisanal mining in order to generate jobs and improve rural livelihoods. Regional dimensions of mining are discussed in the sections below. ADB's private sector window is exploring supporting a project in iron mining in collaboration with IFC, and will continue to explore opportunities in this area. IFC is exploring several investment opportunities in the iron ore and gold sectors. 83. Natural Resource Management and Transparency. Both banks are providing a range of support for Liberia's implementation of the Extractive Industries Transparency Initiative (EITI), to enable Liberia to continue its strong progress towards EITI compliance. This work is being done jointly to ensure complementarities of support to the government's EITI Secretariat 29 and the Ministry of Finance. ADB has funded a scoping study for EITI in the forestry sector and provided Liberia with US$150,000 through the Nordic Trust Fund for Governance for the implementation of the costed work plan of EITI. The World Bank is providing resources under its EITI Trust Fund. Taking the work one step further, the World Bank will support a scoping study of the EITI ++ Initiative, bringing in the full value chain of natural resource management. 84. Regional Initiatives. The World Bank will provide regional financial and technical support, leveraging some US$160 million in IDA financing, to tackle some of the most pressing issues affecting Liberia and its neighbors. This includes collaborative efforts to raise productivity in rice production systems in countries bordering the Mano river and to facilitate cross-border trade of staple foods in this sub-region. A regional mining initiative is expected to be launched, seeking to spur the harmonization of the mining regimes across the region and developing regional geological information database, stimulate broad economic linkages around large-scale mine development, build the capacity of core ministries on mining and associated finance and environment issues, and mitigate negative environmental and social impacts of mining across the sub-region. In fisheries, the World Bank, with other development partners, will support a regional initiative aimed at sustainably increasing the overall wealth generated by Liberia's marine fisheries and the proportion of that wealth captured by Liberia; this will include efforts to reduce illegal fishing and to strengthen Liberia's capacity to govern and manage its fisheries. In energy, the Bank and IFC will work in concert with the West Africa Power Pool program to facilitate a private sector response to restoring Liberia's electricity generation capacity and taking advantage of energy work and connections within the sub-region. In all of these areas, technical assistance has been ongoing informing the country dialogue and paving the way for implementation of the regional operations. CAS Outcome 5: Improved business and investment climate 85. Fostering private sector involvement in the development of key economic sectors is essential for overcoming Liberia's key constraints on growth, including high prices of imports, governance, and poor infrastructure. Through its post-conflict initiative, IFC has reengaged strongly in Liberia. The Corporation plans to combine advisory, technical assistance, and investment operations to introduce innovative ways to mitigate risk, help improve the investment climate, strengthen the financial sector, build the capacity of small and medium enterprises, and mobilize local and foreign investors. 30 Box 3: IFC strategy in Liberia IFC seeks to catalyze the role of private business in developing key sectors of Liberia's economy. Its five broad goals under the Joint Assistance Strategy, as detailed in Annex 21, are to: · Strengthen the financial sector and increase access to finance. The establishment of AccessBank Liberia, a commercial microfinance bank by Access Holdings was strongly supported and financed by IFC and partners. IFC will provide Technical Assistance support to AccessBank Liberia; expand its Global Trade Finance Program and accelerate technical assistance for banks; explore opportunities to (i) establish a leasing company with a credible partner; and (ii) undertake wholesale lending to banks for SMEs. · Support private participation in infrastructure and finance select private companies. As well as helping the government to select a private operator for supplying electricity to Monrovia, IFC will foster private participation in infrastructure (ports, airports, etc) and growth sectors (mining, oil palm, rubber, etc) and finance select private sector projects. Working closely with the World Bank and African Development Bank, it will explore opportunities for exceptional financing from development partners for public-private partnerships (PPPs) in infrastructure, and pursue innovative project development for infrastructure PPPs. · Provide technical assistance and advocacy support for improving the investment climate. Activities in the first phase included identifying barriers to formalization of businesses, re-drafting the investment code, and creating the Liberian Better Business Forum for public-private dialogue, with an IFC-staffed secretariat. The second phase centers on supporting regulatory reform and investment generation. · Support capacity building programs in both the private and public sector, including through a proposed IFC Schools Advisory Services program which will include technical and vocational schools, and access to financing through local commercial banks.. · Increase investments and advisory services support to SMEs. IFC working on establishing an SME fund for Liberia (to be managed by a fund manager), complemented with technical assistance to the enterprises selected for investment. The fund could offer creative financing solutions for small businesses that lack enough equity capital with which to obtain long-term financing to expand their businesses. The TA could also develop other SME expansion strategies e.g. incubate opportunities for SMEs along the value chain of Liberia's growth sectors (e.g. out-grower schemes in oil palm/rubber, linkages program to distributors of soft drinks, breweries, water); structure wholesale lending products to local banks for on-lending to SME prospects; explore opportunities to create business incubators; and offer services to improve corporate governance in SMEs. . 86. Access to Finance. Both IFC and the private sector window of ADB will work to increase access to finance for Liberian banks and businesses, especially small and medium enterprises. IFC will play a lead role in supporting private sector development, with a particular emphasis on encouraging SMEs. To improve the financing opportunities available to private businesses, IFC helped to establish a commercial microfinance bank--AccessBank Liberia-- which will serve as a catalyst for the growth of microfinance banking in the country. IFC will also expand its Global Trade Finance Program; and accelerate technical assistance for Liberia's banks, to improve the take-up and use of the Global Trade Finance program. ADB's private sector window supports the Access Bank Liberia project, and is also exploring support to the Liberian Bank for Development and Industry to increase access to commercial and investment banking in Liberia. Financing will be sought for technical assistance from trust funds such as the Fund for African Private Sector Assistance. IDA will seek to complement IFC's activities through technical assistance for developing a policy framework for revitalizing the financial sector. Activities in this sector will be closely coordinated with those of the IMF. 31 87. Investment Climate. To help improve the overall investment climate, the IFC program includes continuing work to improve the regulatory environment and support investment generation through work with Liberia's National Investment Commission. The first step of IFC support includes: identification of barriers to formalization, re-draft of the investment code, and creation of the Liberian Better Business Forum for public-private dialogue, with an IFC-staffed secretariat. Recommendations on the way forward have been accepted by the government. 88. The second phase of the Investment Climate program is centered on the twin objectives of supporting regulatory reform and increasing investments. Activities include: i) reducing informality by easing the business registration process (financed by the Investment Climate Facility for Africa); ii) improving trade logistics by reducing the time and costs of import and export transactions to foster Liberia's integration into global markets; iii) supporting investment generation through: (a) building the National Investment Commission capacity to facilitate investment attraction and investor outreach, by assisting its transition from an investment regulatory to a facilitating role; and (b) supporting the government's development and implementation of a Special Economic Zone strategy to energize private sector investment in the development of a new industrial zone; and iv) supporting the reform efforts of the Liberia Better Business Forum (LBBF) and the Liberia Business Reform Committee (a cabinet-level committee established by the President to identify and drive implementation of business climate and Doing Business reforms). This support resulted in the achievement of 21 reforms in three Doing Business indicators in 2008. CAS Outcome 6: Increased access to social protection and social services in the face of shocks 89. Liberia's response to the global slowdown should focus on maintaining the strong reform agenda and continued macroeconomic prudence. Continued strong collaboration between the Government and development partners will be paramount. There may also be a need to strengthen the regional dialogue, to mitigate an increased threat of renewed hostility. Box 4 shows possible responses to the economic crisis, which the World Bank Group and the ADB Group could support as the situation unfolds. 32 Box 4: Possible Policy Responses to the Global Slowdown Shock-proofing public finances Begin medium-term expenditure planning, including the Public Sector Investment Program (PSIP) to anticipate cash flows over a longer timeframe and plan for lumpy investments (infrastructure) Broaden the fiscal revenue base through increased taxpayer registration Strengthen the supply response mechanism in agriculture Provide mechanism to reduce risks (crop failure) in agriculture Rebuild the extension and research services Protect the vulnerable Support household income via public transfers including school feeding and cash for work Develop simple means-testing for better targeting social protection efforts Expedite the establishment of the labor market information system Educate the Liberian public about the causes of the financial crisis Educate the press corps and spread awareness in Liberia about the global origins of the financial crisis, and the limitations on the government's abilities to contain its effects on the Liberian economy 90. Social Protection. The need for social protection in Liberia is likely to increase as a result of the worldwide economic slowdown. Both banks responded rapidly to the food price crisis in Liberia. The World Bank organized the Liberia Emergency Food Price Crisis Response under its Global Food Crisis Response Program (GFRP), together with US$10 million from the new Food Price Crisis Response Trust Fund (FPCRTF). The response combines quick-impact social protection measures for the most vulnerable populations with activities to spur agricultural production in areas with the most productive potential. It also begins the process of building up new social protection institutions that will be important to stability in the medium term. Specific activities include: (i) a program for vulnerable women and children, including a school feeding program implemented in partnership with the World Food Program, that is designed to feed up to 62,000 children and keep 4,300 girls in school; (ii) a cash for work program for dry-season employment, which is expected to transfer cash to 17,000 people, including in marginalized urban areas in Monrovia where unrest is a significant threat to social stability; and (iii) a program to expedite the agricultural supply response by supplying essential inputs and interventions to reduce post-harvest losses and increase productivity in rice and cassava. The ADB's new Africa Food Crisis Response makes available quick-disbursing financing to allow the government to implement social protection measures, with additional activities to spur agricultural production. In addition, the World Bank and the ADB will favor labor-intensive building methods where feasible, recognizing that it will take considerable time for the private sector to generate enough jobs to meet Liberia's dire needs, and that lack of jobs could have serious consequences for social stability. 91. Community-Driven Development. The World Bank will continue its existing CDD program (Liberia Community Empowerment Project II, US$5 million), which is being implemented through the Liberia Agency for Community Empowerment (LACE) with additional financing from other donors. This program supports the rebuilding of community cohesion and social capital in addition to much-needed community infrastructure. In addition, LACE will continue to implement the new social protection mechanism noted above. 33 92. Going forward, the World Bank will prepare a series of policy notes on shared growth that will help lay the basis for government's response to protecting the poorest, including employment generation, service delivery, and other social protection mechanisms. In addition, the ADB has recently developed a framework of accelerated resource transfer to ADF countries in response the economic impact of the financial crisis.21 Possible short-term actions consist of either alternative use or accelerated use of currently available resources, with exploration of more resources for the longer term. 93. Finally, the World Bank will continue existing support for increasing access to basic services. It will continue a strong program of analytic work in the education sector, aimed at improving government capacity to manage the sector and provide a possible foundation for accessing the Education For All Catalytic Fund. The Liberia Emergency Health Project will also continue work to strengthen government capacity, rebuild critical health infrastructure, and train much-needed health workers. In both health and education, other donors are taking the lead in managing pooled funds, but the World Bank is valued for its technical expertise and ability to mobilize donors. Cross-cutting objective: capacity development 94. Liberia's stock of skilled people is small even by the standards of post-conflict African countries. To meet pressing needs, the World Bank and the ADB will exploit existing capacity across organizational boundaries, drawing on agencies that have some relevant implementation capacity if the more logical choice of government agency lacks this capacity.22 In addition, World Bank's existing programs embed a wide-range of capacity building activities, explicitly seeking to build capacity with a combination of start-up implementation support, technical assistance, and training. Meanwhile, the two banks will continue seek to help build capacity within implementation agencies for the longer term. As partly described above, efforts will focus particularly on the Special Implementation Unit, the Ministry of Finance, Civil Service Agency, LACE, and the Liberia Water and Sewerage Corporation. The World Bank will support a project coordination unit in the Ministry of Agriculture to begin to develop project management capacity; it is expected that future agriculture sector operations from both banks - and others - will be located within this unit. In addition, the banks will continue their work with Parliament and the Ministry of Finance around the budget process--a critical component of public financial management reform. The World Bank will support a training program for members of Parliament on budget development and analysis, budgetary oversight and processes, and fiscal policy and planning, and will also help to strengthen the capacity of the Liberian Institute of Public Administration. In addition to the existing Senior Executive Service program that aims to attract qualified Liberians back to the civil service, the World Bank will look further support the mobilization of the Liberian Diaspora to support Liberia's development. It will continue support for the Institute for Public Financial Management, an innovative program to 21 Bank Response To The Economic Impact of the Financial Crisis (ADF/BD/WP/2009/32). 22 For example, the Liberia Agency for Community Empowerment (LACE) was created through World Bank project finance as a national agency for community-driven development. But now, to help respond to the food-price crisis, it is being modified to be able to implement a US$3 million cash-for-work scheme under the Emergency Food Crisis Response Program. 34 train young Liberians to take over management of public finances in the coming years. Finally, it will look to provide support to civil society to increase its capacity to demand accountability in governance. The ADB is providing capacity building assistance to the Ministry of Finance in public financial management and macro-fiscal analysis. Both banks will carry out further assessments of capacity building needs during the CAS period, so as to broaden the understanding of the capacity challenge in Liberia, and will develop a set of tailored instruments supported by analytic work, grants, and secondments, among others. Strategic mainstreaming 95. Gender equity. The CAS will promote gender equality and women's economic empowerment wherever such opportunities arise. The World Bank will continue its program of technical and advisory services to build capacity on gender equality and women's empowerment in Liberia, supported by trust funds such as the Multi-Donor Trust Fund for the Gender Action Plan and the Bank-Netherlands Partnership, through its Governance Window. The activities will build on ongoing projects and programs including the US$4.6 million project for Economic Empowerment of Adolescent Girls, supported by the Nike Foundation and the Government of Denmark, and the UNIFEM Results Based Initiative. Analytical work will focus on understanding determinants of and constraints on Liberian women's economic empowerment, to help with the prioritization and mainstreaming of relevant gender interventions in the proposed lending portfolio. This work will be aligned with the World Bank Gender Action Plan's focus on women's economic empowerment. The World Bank will also contribute to strengthening the collection of sex-disaggregated data to facilitate the tracking of gender-relevant indicators. 96. Environmental sustainability. Under the CAS, the World Bank and the ADB will allocate resources mainly through the infrastructure, agriculture, and potential extractive industries programs to further build environmental planning and management capacity in Liberia's line ministries and agencies--notably the Environment Protection Agency (EPA), the Ministry of Public Works, the Forest Development Authority (FDA), the Ministry of Lands, Mines and Energy, and the Liberia Water and Sewerage Corporation--in tandem with the scaling up of investments in the sectors for which they are responsible. The Global Environment Facility will support work to strengthen the management of natural resources and protected areas. The Global Facility for Disaster Reduction and Recovery (GFDRR) will be mobilized to help Liberia develop a natural disaster risk reduction and prevention strategy both at the national and community levels. C. Lending 97. The implementation of the CAS is supported by a number of existing and new financial instruments. These include: IDA, the African Development Fund, the Fragile States Facility (should access be granted), the Trust Fund for Liberia, the Liberia Reconstruction and Development Trust Fund, and others, as well as by analytical and advisory work as described in the following section. 35 98. The banks' new lending programs during the CAS period will combine development policy operations, budget support operations, and investment lending in support of the three strategic themes and the crosscutting objective of the joint strategy. The development policy operations are intended to help address Liberia's external financing needs while the export sectors recover, as well as to support the policy and institutional changes that are needed to create the environment for pro-poor growth and safeguard against external shocks. The investment lending will support the rebuilding of the economic and social infrastructure necessary for enhancing growth and improving social stability, scaling up primarily from existing programs. 99. The operational pipeline for the World Bank and ADB over the next three years adds up to some US$503 million (Table 4). The World Bank's three-year IDA allocation is about SDR 85.8 m (or US$138 million23). It is also expected that IDA regional resources will be determined during the CAS period based on operational needs and under the new rules for IDA 15 for small country programs, leveraging up to around US$160 million in additional resources. The FY09 program will include up to 55% frontloading to help finance larger up-front infrastructure investments, avoiding spreading these out across fiscal years. The Liberia Reconstruction Trust Fund is expected to contribute around US$120 million in donor financing to complement the IDA program. 100. The African Development Bank Group's assistance to Liberia under the CAS will be provided within the framework of ADF-11 (2008-2010), part of ADF-12 (2011-2013), and the Fragile States Facility (subject to Liberia's eligibility to the FSF). ADF 11 performance- based indicative country allocation (as of 2008) amounts to UA 29.81 million (US$46.5 million). The indicative potential FSF supplemental financing amounts to UA13.01 million (US$20.3 million), and indicative potential FSF financing from the targeted support window amounts to UA 1.3 million (US$2.00 million). Total indicative ADF and potential FSF financing under ADF-11 cycle thus amounts to UA 44.12 million (US$68.8 million). Indicative financing in the amount of UA 9 million (US$14.0) may be sought from ADF-12 resources. Additional financing from the African Food Crisis Response amounts to UA 3.0 million (US$4.7 million), and will be provided under the 2008 budget support operation. Total indicative financing during the CAS period is thus UA 56.12 million (US$87.5 million). ADB allocates an indicative US$32.76 million under Pillar I (2 BSOs), an indicative US$31.2 million under Pillar II (WSS), and indicative US$18.72 million under Pillar III (agriculture), an indicative US$2.00 million for capacity building activities, and an indicative US$2.82 million for potential participation in regional programs. 23This reflects an average annual allocation of SDR 28.6 million during each of the years. Actual allocations in the outer years will depend on: (i) the country's own performance; (ii) its performance relative to that of other IDA recipients; (iii) the amount of overall resources available to IDA; (iv) changes in the list of active IDA-eligible countries; (v) terms of financial assistance provided (grants or loans); and (vi) the amount of compensatory resources received for MDRI. IDA and ADB allocations are made in SDRs and in UA respectively, and the US$ equivalent is dependent upon the prevailing exchange rate. . 36 101. Preparation of Projects under OP/BP 8.0024. Since 2006, all projects in the Liberia portfolio have been prepared under emergency procedures, first OP/BP 8.50 and subsequently the new OP/BP 8.00 "Rapid Response to Crises and Emergencies". OP/BP 8.00 has put in place streamlined project preparation procedures to enable quick response to urgent needs on the ground in Liberia. On the other hand, the new policy is premised on the need for intensive project management and supervision, particularly in low-capacity post-conflict environments like Liberia. Over time, it is expected that Liberia will transition into regular investment lending with less of a demand on intensive implementation support from the Bank. The focus in the CAS on building implementation capacity aims to fulfill this objective. In the meantime, it is proposed that some Bank projects will continue to be prepared under the aegis of OP/BP 8.00. Projects financed by the Liberia Multi-Donor Trust Fund will be prepared using the Bank's rapid response policies and procedures, since the use of these procedures form part of its governance arrangements agreed by all donors. These arrangements will be reviewed at the time of preparation of the CAS Progress Report. D. Non-lending Program 102. Knowledge creation and transfer is a fundamental part of the work of the World Bank Group and the ADB in Liberia, particularly in view of the relatively small allocations of funding relative to Liberia's vast needs. A large body of analytic work has been substantially completed during the past year under the ISN, including a public expenditure financial accountability (PEFA) survey; a comprehensive poverty diagnostic; a public expenditure management and financial accountability review (PEMFAR); a comprehensive assessment of agriculture; education and health sector assessments; and a diagnostic trade integration study, and policy notes on pro-poor growth. Currently underway are more comprehensive studies in education and natural resource management. Analytic work on EITI++ and mining may also be carried out. A second poverty diagnostic will be completed and will be followed by a poverty assessment. The dissemination of these reports will provide the basis for policy discussions with government and other development partners on the country's development priorities. 103. The two banks will align their analytical work, like their lending, to the strategic themes and crosscutting issue of the CAS, focusing on creating the knowledge base for strong policy advice and on identifying specific strategies for enhancing pro-poor growth. 104. Table 5 provides an overview of anticipated analytic work over the CAS period. The two banks will undertake analytic work jointly where possible. 24See OP/BP 8.00 Rapid Response to Crises and Emergencies 37 Table 4: Liberia CAS Indicative Program: Main Funding Sources (FY09-12) Lending Main Theme Project IDA Regional AfDB LRTF Total PRSP Alignment (US$m) IDA (US$m) I. Rebuilding of Pillars II and III Core State Functions and Institutions Development Policy Support 15 -- 33 -- 48 Capacity Building TA -- -- 2 -- 2 Sub-total 15 -- 35 -- 50 II. Rebuilding Pillar IV Infrastructure to Jump-Start Growth Transport 96 -- -- 96 Energy 151 140 -- -- 155 Water and Sanitation -- -- 31 -- 31 Sub-total 111 140 31 1202 402 III. Facilitating Pillars II and IV Pro-Poor Growth Growth/Agriculture 12 20 19 -- 51 (including Regional Agriculture, Fisheries & Mining) Other regional -- 3 -- -- Sub-total 12 20 22 -- 51 Grand Total 1382 1603 88 120 503 1 - o/w $10m is to leverage regional IDA and $5m to support electricity sector improvements. 2 - The three-year IDA allocation is about SDR 85.8 million, with an average annual allocation of SDR 28.6 million during each of the years. Actual allocations in the outer years will depend on: (i) the country's own performance; (ii) its performance relative to that of other IDA recipients; (iii) the amount of overall resources available to IDA; (iv) changes in the list of active IDA- eligible countries; (v) terms of financial assistance provided (grants or loans); and (vi) the amount of compensatory resources received for MDRI. IDA allocations are made in SDRs and the US$ equivalent is dependent upon the prevailing exchange rate. 3 - Regional IDA and LRTF project-level allocation to be confirmed during the CAS period. 38 Table 5: Indicative Planned Analytic Work Fiscal Product Year Policy notes (e.g. macro, fiscal FY10 decentralization, agriculture, and social protection) (WB) Diagnostic Trade Integration Study (WB) FY09 Women's Economic Empowerment (WB) FY10 I. Rebuilding of Core State Functions and Gender Profile (ADB) FY09 Institutions Education Sector Plan (WB) FY10 Poverty Assessment (WB) FY10 PEFA (WB/ADB) FY11 II. Rebuilding Water Sector Reform Study (ADB) FY09 Infrastructure to Jump Start Economic Growth Oil Palm Sector Study (WB) FY09 Policy Note on Pro-poor Growth (WB) FY09 II. Facilitating Pro- Financial Sector Revitalization Strategy (WB) FY09/10 Poor Growth Energy and Electricity Strategy (WB) FY10 EITI ++ Scoping Study (WB) FY10 E. Trust Funds 105. While it was still in arrears to the international financial institutions, Liberia relied heavily on trust funds to allow World Bank and ADB interventions. Because of the need to access a number of different instruments (e.g. LICUS, TFLIB, NTFG), this led to a highly fragmented and transaction-intensive portfolio. Under the CAS, trust funds will be used selectively, to leverage existing resources or to put in place large interventions where IDA and ADF do not play a role (Table 6). The recently launched Liberia Reconstruction and Development Trust Fund (LRTF) for infrastructure is expected to make available around US$120 million during the CAS period. Contributions and pledges currently include Germany (US$24 million in 2007/2008); Sweden (US$10 million); European Commission (US$80 million); Ireland (US$4 million); and the World Bank (US$3 million ­ LICUS Trust Fund). For infrastructure investments, the ADB will assess whether the alternative of channeling such resources through the LRTF is preferable. The fund will leverage World Bank capacity and knowledge to assist the government in preparing and implementing infrastructure reconstruction. LRTF projects will be integrated into the IDA portfolio; they are designed and prepared under IDA emergency policies and procedures in order to exploit synergies with existing World Bank 39 infrastructure projects. Projects will be programmed according to Government PRS priorities and are expected to center mainly on transport and sanitation infrastructure in the initial period. 106. Other planned and potential trust-funded activities during the CAS period include: the support from the Global Environment Facility, mentioned above, for management of natural resource and protected areas; potential support for land tenure reform from the new State and Peace building Trust Fund; and continuation of very successful TA support for telecoms regulatory reform. Trust fund financing may also be sought during the CAS period from the Education for All Catalytic Fund, which could bring large resources to bear in the education sector, where IDA and ADF operations are constrained. Pending continued satisfactory performance, the Cash For Work program under the Food Price Crisis Response program may seek resources to scale up its activities. Smaller trust funds could be used judiciously to support ongoing initiatives, for example to support EITI implementation, debt reduction, activities supporting the rule of law, and financial sector reform. ADB will continue to pursue trust fund financing for governance reform, including land reform. VI. CAS MONITORING 107. The CAS has been designed with a strong focus on achieving and demonstrating results on the ground. The CAS Results Framework (shown in Annex 1) uses Liberia's PRS as its starting point, and narrows down the range of PRS objectives to those that the World Bank and ADB can demonstrably contribute to during the CAS period. Given that results during the CAS period will come mainly from already-existing operations and the quicker-disbursing interventions, the results framework is closely linked with the expected results of the ongoing portfolio of operations and analytical work. The framework has been formulated in light of the capacity constraints on results management in Liberia. The CAS Monitoring and Evaluation Plan (shown in Annex 2) details the baselines and targets for all indicators and milestones, as well as the sources and responsibilities for data collection and monitoring. 108. The CAS outcomes will be monitored jointly by the World Bank Group, the ADB Group, and the government over the CAS period. As noted, the ADB Sierra Leone Field Office will enhance the M&E activities of ADB in Liberia. Regular portfolio reviews aligned with the results framework will be carried out, jointly with other development partners when possible. At mid term, a CAS Progress Report will be prepared, and mid-course adjustments may be made in light of its findings or of changing country circumstances. A completion report will be prepared at the end of the CAS period. 40 Table 6: Trust Fund Commitments and Relevance to Core Program Trust Fund Connection to Core Program Existing Commitments New Commitments in CAS period Bank-Netherlands Improving the gender targeting of $75,000 None Partnership Program public expenditures Governance Window FIRST TF Financial sector capacity building n/a To be determined GAC Trust Fund Governance and decentralization n/a To be determined Global Environment Environmental and natural resource $1.7 million To be Fund (GEF) management determined Food Price Crisis Social safety net support (e.g. $10 million To be Response Trust Fund school feeding, cash for work); determined (FPCR TF) agricultural production support IDA Debt Reduction Debt reduction ­ commercial debt $1.3 million To be Facility determined Liberia Reconstruction Infrastructure Rehabilitation $18 million $125 million Trust Fund (MDTF) LICUS Trust Fund Public financial management, public $45 million None procurement, donor coordination, labor-intensive public works (urban), natural resource management, public sector/civil service reform MDTF ­ EITI Natural resource governance $400,000 n/a MDTF for the Gender Gender equality and women's $75,000 To be Action Plan (GAP MDTF) economic empowerment determined Multi-Donor Trust Fund Economic empowerment of women $4.6 million To be for Economic determined Empowerment of Adolescent Girls (EPAG MDTF) Nordic Trust Fund Governance Reform $0.3 million N/A PPIAF Telecoms reform n/a $250,000 South/South Trust fund Capacity building for telecoms n/a $75,000 75 K regulators State and Peace building Governance and Land Tenure n/a $2 million Fund Reform TFLIB Economic and natural resource $25 million None ­ fully governance, infrastructure, public committed sector/civil service reform 109. All new operations will be designed with a focus on clearly defined outcomes, sound results measurement, and M&E arrangements adapted to Liberia's situation. During the start-up phase of the two banks' current Liberian operations, monitoring information was scarce but programs needed to get up and running quickly. As the program matures and more data become available, collection and reporting on outcomes is being strengthened across the portfolio. An effort will be made to improve project-level M&E, paying appropriate attention to the emergency context of many operations. In this connection it will be important, given the 41 limited capacity in many ministries, to align with and strengthen existing sectoral M&E efforts as well as to support the system that is being established to monitor the implementation of Liberia's PRS. The World Bank and the ADB are planning to focus particularly on supporting the development of sound M&E systems related to infrastructure, agriculture, and public financial management. VII. PARTNERSHIPS AND PARTICIPATION A. Partnerships and Donor Coordination 110. Total official development assistance to Liberia is estimated at US$357 million for 2007.25 This excludes UNMIL's peacekeeping operations. The largest donor is the United States government, which provided almost US$100 million, followed by the combined contribution of the UN agencies, at almost US$90 million, and the World Bank, at about US$40 million in 2007. In addition to ODA, Liberia receives significant support from private foundations including the Soros Foundation, Clinton Foundation, and Gates Foundation. The bulk of aid to date has been dedicated to security sector reform, health, education, and infrastructure. Data on aid flows are limited and most of the funding is not channeled through government structures. 111. Development assistance is coordinated through the Liberia Reconstruction and Development Committee (LRDC), which was established in 2006. LRDC is a transitional mechanism that provides a platform for dialogue between the government and development partners, and is organized around the four PRS pillars. Cooperation among lead donors has been strong, but aid coordination vis-à-vis the government has been less so, and the government has had limited tools and information with which to monitor the aid flows coming into the country. The government is making significant efforts to strengthen its capacity to monitor aid flows and interventions. For its part, the LRDC has made it a priority to foster harmonized and accurate donor reporting on disbursements for development. Its recently completed Paris Declaration Survey on Aid Coordination and Harmonization will help in establishing a benchmark and monitoring system. More predictable sector strategies, combined with more Liberian (versus donor) execution of projects, and, eventually, donors' contributions to budget support, will improve the government's control over its reconstruction resources and agenda. In fact, more donors are moving towards putting their aid on budget, including early indications from the EC and the ADB. 112. Liberia provides a strong example of donor coordination at the operational level. Table 7 shows the main areas of support by each main donor. Consistent with a fragile-states approach, donors concentrate in a few key areas, aligning their support and sending common messages to government. For example, the US, the World Bank, the ADB, the EC, and the IMF all support fundamental economic governance reforms, but ensure that their programs are mutually reinforcing. In water supply and sanitation, where the ADB is now the lead agency, the World Bank will not undertake new work during the CAS period. The World Bank is the 25Based on data from the Liberia Reconstruction and Development Committee's recently completed Paris Declaration Survey. 42 leading donor for roads but strongly coordinates its activities in this area with the UN, and it relies on the UNDP to administer more than US$20 million in World Bank grant funding. In road building, the European Commission will channel resources through the World Bank- managed Liberia Reconstruction and Development Trust Fund for infrastructure. Table 7: Key Donor Activities in Liberia Sector Main Partners PRS Cost (US$ mil) Peace and security 252 Security sector reform US government, UNMIL Economic revitalization 141 Food and agriculture ADB Group,FAO, WFP, World Bank Group Labor and employment ILO, World Bank Group Investment, trade, export promotion, ADB Group, EC, IMF, USAID, World Bank private sector support Group Financial services ADB Group, IMF, World Bank Group Governance and Rule of Law 224 Rule of law UN, USAID, World Bank Civil service reform DFID, UNDP, USAID, World Bank, Governance and Public Financial ADB Group, DFID, UN, USAID, World Bank Management Reform Infrastructure and basic services 995 Infrastructure ADB Group, EC, USAID World Bank Group Water and sanitation ADB Group, World Bank Group Health DFID, Irish Aid, UNICEF, USAID, World Bank Group Education UNICEF, USAID, WFP, World Bank Group 113. A move to budget support will increase efficiency. As the government increases its capacity for transparent financial management, a transition will be needed whereby donors channel more of their aid through the national budget. This will allow the implementation of larger, more effective, and "mainstream" programs, rather than the proliferation of "pilot" and small post-conflict initiatives that has been typical since the conflict ended. B. Participation 114. In 2007/08, government carried out comprehensive consultations as a part of the development and validation process for the Poverty Reduction Strategy. As well as providing deep insights into people's interests, the key messages of the consultations became the basis for the four pillars of the PRS, which together make up the country's strategic framework for development. The key messages of the consultations were: · National security. Despite an improvement in security since the end of the civil war, crime and violence are still prevalent. Liberians cited the shortage of qualified security staff, the incidence of corruption, and the public's distrust in the police force. 43 · Economic revitalization. The public noted that agriculture, roads, and access to finance are the highest priorities. · Governance and rule of law. The consultations revealed that corruption is present at all levels of government. · Infrastructure and basic services. The consultations emphasized shortages in four sectors, in the following order of importance: (i) roads; (ii) safe drinking water and electricity; (iii) educational facilities and trained teachers; and (iv) healthcare facilities and trained medical personnel. VIII. MANAGING RISK 115. Liberia's fragile economic and social situation puts it at risk from external shocks. The CAS supports a holistic approach to mitigating such risks. This includes World Bank Group support from the Food Price Crisis Trust Fund to put in place a cash-for-work social safety net program and a program to increase agricultural productivity, and ADB's increased budget support and investments in raising agricultural productivity. IFC is globally working to shore up the private sector with facilities that will ensure private sector trade flows through its trade finance program, focus on keeping infrastructure projects on track and shift advisory support to help companies weather the crisis. In addition, the World Bank will support appropriate macroeconomic policy responses to external shocks through its programs of targeted budget support, and both the World Bank and ADB will work with the IMF to ensure that their policy positions are mutually consistent. And, as noted in Box 4 above, the World Bank stands ready to assist the government with further possible policy responses to the global slowdown. 116. Liberia faces considerable risks following the disruptions caused by the civil conflict. A major risk is that of insecurity. Although the deployment of UNMIL peacekeepers and police has restored peace and stabilized most parts of the country, the state institutions and mechanisms (including the police and judiciary) that are responsible for protecting citizens' human rights remain fragile and underdeveloped. In particular, the large number of ex-combatants awaiting reintegration and rehabilitation opportunities, as well as the political groups who have been marginalized in the new political context, might pose challenges to security. Further, the unstable regional context, including in Côte d'Ivoire and Guinea, continues to present an external risk. Thus, UNMIL's continued presence under a strong Security Council mandate is critical, as are enhanced efforts by the government to reform security institutions and reintegrate ex-combatants into Liberian society. 117. Widespread unemployment and the perception that peace has only limited tangible benefits pose a risk to stability during the CAS period. This risk cannot be fully mitigated. It is being addressed through the creation of a national urban and rural employment program, under the Liberia Agency for Community Empowerment, which that can be scaled up in the future. The work to be carried out on pro-poor economic growth will need to generate both short-term and structural employment for the working classes as a critical part of Liberia's return to stability in the medium term. 44 118. The government's shortage of capacity to implement reforms poses another significant risk. This risk is mitigated by the support provided by development partners, but substantial additional efforts to build capacity are urgently needed. As discussed above, the CAS will build capacity at the project implementation level, support civil service reform, and help to build the capacity of specific government agencies in charge of implementing reforms. The World Bank Institute will continue its support on strengthening the Liberian Parliament's role in the budget process. 119. Corruption is an additional risk. Corruption and the abuse of power and privileges continue to impede effective policy implementation, public service delivery, and the reduction of poverty. Yet the government has shown a firm commitment to fight corruption, by finalizing an anti-corruption strategy and passing anti-corruption legislation. It has shown its commitment to enhancing governance, transparency, and accountability in the work of the public sector through the continued implementation of GEMAP and it is embracing the Extractive Industries Transparency Initiative. 120. A further risk concerns the government's ability to get legislation passed by Parliament, where the President's political party lacks a majority. A failure to win the support of members of other parties could undermine the government's reform efforts. Continued strong demonstrations of international support for the current administration's anti- corruption efforts--combined with judicious attention to internal fiduciary controls and external private sector/civil society scrutiny and appropriate capacity building--are expected to help mitigate these risks. 121. Given the emphasis on building new infrastructure and potential development in Liberia's mining sector, the government's ability to address environmental issues and manage environmental and social impacts is crucially important. Dedicated capacity to regulate and manage environmental impacts is not yet keeping pace with needs. Under the CAS, the World Bank and the ADB will allocate resources (primarily through infrastructure programs) to further build environmental planning and management capacity in key line ministries and agencies, notably the EPA; the Ministry of Public Works; the FDA; the Ministry of Lands, Mines, and Energy; and the Liberia Water and Sewerage Corporation, as investments are scaled up in the sectors for which they are responsible. IX. SCALING UP AND EXIT STRATEGY 122. If current circumstances continue, the World Bank will continue to provide post- conflict allocations from IDA in line with current IDA allocation policy, the IFC will continue to engage and actively explore private sector financing opportunities, and the ADB will operate under ADF and Fragile States Facility (should access be granted) policy. Provided Liberia's policy performance is satisfactory, the World Bank expects to provide modest annual budget support operations. Satisfactory implementation of the investment portfolio would provide an important basis for moving forward with the new operations outlined in the joint strategy. 45 123. In the event of unsatisfactory progress on reform, the World Bank and ADB would enter into dialogue regarding the basis of future budget support operations. Should poor portfolio performance arise, the World Bank and ADB would adjust their operations as needed, revising implementation schedules and planned activities, or, in the case of severe obstacles, would partially suspend their activities. Lack of progress on reform would also affect the private sectors appetite for investment and thus the ability of IFC and ADB to finance private sector projects. Despite the significant challenges and risks, the World Bank Group and the ADB Group remain committed to staying engaged in Liberia over the long term. 46 Annex 1: Draft Results Matrix for Liberia CAS (FY09-FY11) Selected World Bank Key Issues CAS Outcome CAS Liberia PRSP objectives Group/ADB & indicators26 from PRSP & Indicators Milestones Instruments CAS Strategic Theme 1 ­ Rebuilding of Core State Functions and Institutions (aligned with PRSP Pillar III) Create a new framework · Fragmented and incomplete 1. Improved efficiency of budget Budget Preparation and Execution On-going Projects: for PFM legislation, unclear rules and preparation and execution and 80 % of vouchers can be approved and paid by Support for MOF Resource lack of coordination create enhanced revenue MOF by 2009 (compared to 60% in 2006) Management Unit (FY07) (WB) Improve PFM using an opportunities for abuse and administration ADB Institutional Support integrated financial corruption Quarterly expenditure reports posted within 6 Project (FY07) management system · The accounting system is Budget Execution handicapped by a single- weeks after end of quarter by 2009 (compared 1.1 Reduction in number of days to entry system, weak purchase to 3 months after in 2007) (WB) EGIRP (FY08) process payment vouchers by at Improve revenue order and accounts payable least 50% (from 14 days) by 2010 collection by implementing systems and weak Three modules of the IFMIS system (General IFMIS (FY08) (WB) tax administration coordination between HR Ledger, Budget Preparation and HR and Pay reforms and automation and Payroll and between Roll) operational by 2011 (WB & ADB) Public Procurement Reform MOF, BoB and CBL (FY04) · Outdated laws, overlapping <20% of public procurement that used direct contracting and/or less competitive methods Pipeline Projects: (No indicators presented in the procedures, weak without proper justification by 2010 ADB budget support PRSP) organizational structures and (compared to estimated more than 80% in operation (FY09) limited automation have 2008) (WB) resulted in inefficient WB Development Policy revenue administration · Weak procurement legal General auditor produces audits for five Operation (FY09) Ministries that are submitted to Parliament by framework and practices 2009 (ADB) AAA lead to inefficiencies in the DTIS (FY09) use of public funds Internal audits produced for 3 key ministries by 2009 (ADB) Partners: DfID Macro-fiscal unit performs functions linking budget to Medium Term Fiscal Framework by 2010 (ADB) 26This is a subset of the Liberia PRSP Objectives taken directly from the final PRSP document. 47 Selected World Bank Key Issues CAS Outcome CAS Liberia PRSP objectives Group/ADB & indicators26 from PRSP & Indicators Milestones Instruments Revenue Administration Revenue Administration 1.2 50% of collected revenue New computerized Integrated Tax captured in the Integrated Tax Administration System (ITAS) operational by Administration System by 2010 2010 (WB) (WB) Tax administration risk management systems implemented and post audit systems enhanced by 2010 (ADB) Strengthen and enhance · Public institutions, for the 2. Increased professionalization Civil Service Professionalization Ongoing Projects: the effectiveness and most part, have been bloated, and improved HR management Senior Executive Service (SES) Scheme is Senior Executive Service efficiency of public disorganized, weak and of the civil service fully operational - at least 70 staff recruited by (TFLIB- FY08) 2009 (WB) institutions and functions supportive of corrupt practices. Civil Service Reform Project Civil Service Professionalization 3 Ministries implement restructuring plans (LICUS - FY08) % of population that perceives · Experienced and qualified based on redefined mandates, new the Government of Liberia to professional staff left the 2.1 35% of SES staff who are rated organizational structures and matching EGIRP (FY08) be performing better than in the civil service because of low satisfactory in terms of staffing plans (WB) previous year salaries performance against targets in · Staff motivation is low Partners: UNDP, EC, performance contracts are Civil Service Reform Strategy in place by USAID, DfID Number of Ministries, · Payroll controls are weak retained in the civil service at 2009 (WB) Agencies and SOEs/parastatals and there is a high number of the end of their contract (WB) restructured based on revised, ghost workers Development of a plan for LIPA's training published and adopted 2.2 50% of SES staff builds delivery by early 2009 and 25 MDA staff mandates sustainable capacity for trained by 2010 (WB & ADB) improved management of government functions by A system of performance evaluation based on effectively training and merit is designed and linked to compensation nurturing and least one staff and promotion systems by 2011 (WB) during the time of their contract. (WB) HR Management of Civil Service Personnel records maintained with one file for each employee with matching payroll records. (WB) Personnel file includes biometric information for 100 percent of employees. (WB) 48 Selected World Bank Key Issues CAS Outcome CAS Liberia PRSP objectives Group/ADB & indicators26 from PRSP & Indicators Milestones Instruments HR Management of Civil Service Rationalisation of civil service grades and development of a well defined salary structure. 2.3 Discrepancy between nominal (WB) and actual payroll less than 2% in 2010 (compared to 25% in Retirement age and rules are enforced 100% 2007) (WB) of the time. (WB) CAS Strategic Theme 2 ­ Rehabilitating Infrastructure to jump-start growth (aligned with PRSP Pillar IV) Transportation - to Transport 3. Improved access to key Transport On-going Projects improve the Liberian · Liberia's roads network is in infrastructure services Cotton Tree ­ Buchanan road corridor under Agriculture and transport sector through complete deterioration. Output Based Road Performance Contract Infrastructure Dev. Project (OPRC) by 2010; Monrovia Ganta corridor (FY08) policy, systems and · Liberia has limited road Transport under OPRC by end 2011. (WB) infrastructure development maintenance workforce. 3.1 20% reduction in travel time between Monrovia ­ Ganta and Emergency Infrastructure that create access to · Poor port facilities, Cotton Tree ­ Buchanan by 2011 Draft legislation on establishment of Road Project (FY06) reliable, affordable and inefficient institutional (WB) Authority and Road Maintenance Fund by efficient services framework and inadequate 2011 (WB) ADB Labor-based Public port maintenances. 3.2 Primary and feeder roads Works Program Indicators: roads rehabilitated rehabilitated and subject to 24 kms of Monrovia roads resurfaced (WB) or reconstructed by 2011 sustainable maintenance increase Pipeline Projects: Vessels clearing Freeport of from 25% to 45% by 2010 New Vai Town, Caldwell (WB) and four other Monrovia/Urban Monrovia increased from 28 to (ADB) bridges (ADB) and 35 minor river crossings Infrastructure Emergency 32 per month built or improved by June 2011 Project (FY09) 3.3 Productivity of the Monrovia port increased from 3 moves/hr 600 kms of roads under maintenance 2009- Urban and Rural per crane in 2008 to 8 moves/hr 2011 (WB) Infrastructure Rehabilitation per crane in 2011 (WB) Project (FY09) 400 kms (WB) + 600 kms (ADB) of rural feeder roads rehabilitated by 2011 ADB Agriculture Sector Rehabilitation Project 125 km of primary roads rehabilitated by end (FY09) 2010 using LB methods (ADB) Partners: Norway, EC, US 229 drainage points constructed by 2010 (ADB) 70% of the general cargo operations by 49 Selected World Bank Key Issues CAS Outcome CAS Liberia PRSP objectives Group/ADB & indicators26 from PRSP & Indicators Milestones Instruments professional terminal operator by 2010 (WB) Landlord Port Authority established by 2010 (WB) Water and Sanitation - Water and Sanitation Water and Sanitation (Monrovia) Water and Sanitation (Monrovia) On-going Projects Reduce the water and · Only about 42% of the 3.4 Number of people served with Number of household water connections in Emergency Infrastructure sanitation-related disease Liberian population has safe drinking water increased to Monrovia increased from 17,900 in 2007 to Project (FY06) 700,000 by 2010 (ADB) 50,000 by 2010 (ADB) burden in Liberia access to improved drinking water. Labor-based Public Works · Only about 39% of the 3.5 Number of people with access to 75 km of Transmission Mains and over 200 Project (FY08) population has adequate sanitation facilities increased to km of Distribution lines rehabilitated in means of human waste 300,000 by 2010 (ADB) Monrovia by 2010 (ADB) ADB Monrovia Water collection. Supply and Sanitation · Liberia's urban Treated water volume at Monrovia plant Rehabilitation Program increased from 2 million gallons per day infrastructure is destroyed (MGD) to 6 MGD by 2010 (WB) Pipeline Projects: and in disarray and city ADB Monrovia Extension planning is poor. · Operation of water and 1 sewage stabilisation pond, and 31 public and 3 County Capitals toilets, rehabilitated/constructed by 2010 Project (FY09) sanitation facilities currently (ADB) unsustainable. Monrovia/Urban 40% of solid waste disposed of in a sanitary Infrastructure Emergency manner annually (compared to 25%) (WB) Project (FY09) AAA: Water/sanitation Expansion and Rehabilitation ­ study (ADB) Partners: Norway, EC, US 50 Selected World Bank Key Issues CAS Outcome CAS Liberia PRSP objectives Group/ADB & indicators26 from PRSP & Indicators Milestones Instruments Energy ­ Provide reliable, Energy Energy (Monrovia) Energy On-going Projects sustainable and affordable · Grid electricity is non- Emergency Infrastructure energy services to all existent outside Monrovia 3.6 Number of connections to the Selection of a Management Contractor for an Project (FY06) electricity grid increased from integrated Electricity Concession for Liberians in an · Presently only 2.65MW of 350 in 2006 to 3,600 in 2010 Monrovia by 2009 (IFC/WB) Improved Electricity Access environmentally sound power is available in (WB) for Liberia (GPOBA) manner Monrovia while the demand is between 30 to 50MW Special Purpose Company for regional transmission operation formed by 2010 (WB) Pipeline Projects: Indicators: % of households Monrovia/Urban with access to electricity Feasibility Study for the interconnections Infrastructure Emergency increased from 0.6% to 10% by between Liberia, Cote D'Ivoire, Guinea and Project (FY09) 2011 Sierra Leone completed by June 2010 (WB) Installed capacity increased IFC Program to Implement from 2.6 MW to 29.6 MW by Public Private Partnership in 2011 the Monrovia Power Sector WB Power Sector PRG (FY10) Regional West Africa Power Pool Project (FY10) AAA: Infrastructure Strategies: (Energy FY09/10) (ADB) Partners: Norway, EC, US CAS Strategic Theme 3 ­ Facilitating Pro-poor Growth (aligned with PRSP Pillar II) Agriculture and Food · Agricultural supply chains 4. Improved agriculture and On-going Projects Security - Revitalize the have collapsed due to natural resources management Agriculture and food and agricultural sector fragmented markets, weak in a way that generates pro- Infrastructure Development poor growth Project (FY08) to contribute to shared, rural demand, no value 51 Selected World Bank Key Issues CAS Outcome CAS Liberia PRSP objectives Group/ADB & indicators26 from PRSP & Indicators Milestones Instruments inclusive and sustainable addition, and few incentives Agriculture economic growth and for cash crop production. Agriculture Number of markets where seed rice is Emergency Infrastructure development; provide food · Agricultural institutions 4.1 Yields of rice increased from available has increased from 3 in 2007 to 7 in Project (FY06) 700 kg/ha to 1200 kg/ha among 2009 (WB) security and nutrition; remain largely ineffective at beneficiary farmers by 2010 Community Empowerment increase employment and delivering services such as regulation, policy and (WB) Local seed multiplication facility established II (FY07 + AF FY08) income; and measurably planning, and research and and produces 1000 mt of certified seed (WB) reduce poverty. extension. 4.2 Yields increased (ADB): Pipeline Projects: - irrigated rice from 1 ton/ha in Two new agricultural sector policies Agriculture Sector Indicator: Growth of 2009 to 1.5 ton/ha in 2011 completed with results framework by 2010 Rehabilitation Project agricultural production % - upland rice from 0.7 ton/ha in (WB) (FY09) (ADB) 2009 to 1.2 ton/ha in 2011 AFCR component of At least 3 markets constructed/rehabilitated by - maize from 1 ton/ha in 2009 to Budget Support Operation 2010 (WB) 1.5 ton/ha in 2011 (FY09) (ADB) - cassava from 5 ton/ha in 2009 Reduced import tax on rice and tariffs for to 6.5 ton/ha in 2011 agricultural inputs (ADB) Regional Fisheries (FY09) 4.3 Metric tons of cocoa sites Pro-Poor Growth Project ­ increased from 3,000 in 2007 to Agriculture (FY10) 4,000 tons by 2010 (WB) AAA: IFC sector study on palm oil (FY09) Policy Note on Pro-Poor Growth (FY09) DTIS (FY09) Partners: WFP, EC, US Forestry ­ The forestry Forest Forest Forest Ongoing Projects: sector should become a · Lack of awareness and 4.4 All illegal concessions cancelled 2 community forestry concessions by 2010 Forestry Sector Management source of higher incomes for information and compliance and no commercial logging Project (WB) outside of concession framework (TFLIB ­ FY07) the rural population, with the law in relation to (WB) ensuring that the benefits commercial and other Community Rights Law approved by 2009 forestry. EGIRP (FY08) are shared equitably, and (WB) that adequate environmental · Small area allocated for protected area network and a AAA: and other regulatory 52 Selected World Bank Key Issues CAS Outcome CAS Liberia PRSP objectives Group/ADB & indicators26 from PRSP & Indicators Milestones Instruments safeguards are in place to non-comprehensive legal Declaration of 3 new Protected Areas by 2010 Policy Note on Pro-Poor ensure sustainability. framework to govern (WB) Growth (FY09) wildlife management DTIS (FY09) Indicator: Volume of timber · Rights and responsibilities of Calculation of the carbon storage for Liberia products produced increase communities with respect to by 2009 (WB) from 0 to 1327 000 cubic forests are lacking. meters by FY10/11 Mining - To rapidly expand Mining Mining Mining Ongoing Projects: mining as an engine of · Lack of consistent, fair and 4.5 Achieve EITI compliant status by Large-scale exploration and mining licenses EGIRP (FY08) economic growth and social enforceable mineral 2011 (WB and ADB) issued through/ recorded in mining cadastre EITI Secretariat Support development, to ensure that agreements, and high system (WB) (WB TF and ADB TF) the benefits from mining transaction costs. Transparent and internationally competitive activities are widely shared, · Low efficiency in recovery of minerals, and poor mineral asset tendering procedures are Pipeline Projects: to diversify the mining environmental and social consistently applied to all tendered out mineral Regional Mining sector into new and practices. concessions (WB) COCPO TA downstream activities, and · Lack of adequate logistics Potential ADB iron mining to improve support to local private sector window and human resources in the At least 2 reports of payments to and revenues miners. project Ministry of Lands, Mines received by the Government for mining and AAA: and Energy minerals are published (WB) Indicator: Volume of iron ore Mining Sector Review produced increase from 0 to 3 Adopt environmental and social management (FY09) million tons by 2011 framework for minerals sector compliant with Policy Note on Pro-Poor international good practices (WB) Growth (FY09) DTIS (FY09) Land and Environmental Land Land Ongoing Projects: Policy - To develop a · Inequities in access and Policy framework for land tenure reform ADB Land Reform comprehensive national utilization of land. adopted (WB and ADB) Commission (TF FY07) land tenure and land use · Polices to promote Pipeline projects: system that will provide investment and development Land tenure support project equitable access to land and are nonexistent or inadequate. (SPF) security of tenure. · Taxation and zoning rules Land Tenure Study (FY09) Policy Note on Pro-Poor are inadequate and/or Growth (FY09) outdated DTIS (FY09) 53 Selected World Bank Key Issues CAS Outcome CAS Liberia PRSP objectives Group/ADB & indicators26 from PRSP & Indicators Milestones Instruments Private Sector Investment · Administrative and 5. Improved business and Creation of Liberian Better Business Forum Ongoing Projects: - Create a strong enabling regulatory barriers severely investment climate (LBBF) with functioning and operational IFC ­ Business Registry with environment for private limit the ability of Secretariat to facilitate Public Private support from the Investment Dialogue (IFC) Climate Facility for Africa sector investment and businesses, especially SMEs, 5.1 3-4 reforms related to Doing exports in non-traditional to operate effectively and Business indicators per year27 efficiently. Creation of at least one commercial IFC Global Trade Finance activities. (IFC) · Outdated provisions of the microfinance bank (IFC) Program Indicator: Number of new investment code create 5.2 Increased access to micro-credit Identification of barriers to business IFC CASA Advisory Program registered businesses increase obstacles to domestic and for micro-enterprises (IFC,ADB) formalization (IFC) from 1047 in 2007 to 1622 in foreign investment. WBG Doing Business 2011 · Majority of payments are Redrafting Investment Code (IFC) Reform Program made in cash, which Financial Sector - undermines security and Modern business registry developed (IFC) ADB Access Bank Liberia To promote a stable, sound flexibility of finances and Project (FY08) credit and market-based financial 2 Business Reform Committee (BRC) and system that supports · Financing for productive Liberian Better Business Forum IFC Access Bank Liberia investments for the poor and efficient mobilization and (LBBF) reforms enacted (IFC) Project (FY09) for MSMEs is limited allocation of resources to · High volume of non- Access Bank Liberia manages 20,000 Pipeline projects: foster sustainable economic performing loans accounts by 2011 (IFC, ADB) Pro-Poor Growth (FY10) growth and poverty · Poor integrity, weak internal reduction IFC SME Ventures controls and long delays in Functioning one-stop shop service for customs customs clearance result in facility (ADB) Budget support operation Indicator: Banking system poor investment climate, (FY09) (ADB) deposits/GDP increase from revenue leakage Potential ADB private sector 21.4% to 30% in 2011 window LBDI Project (FY10) Non-performing loans decrease from 31% to 15% (by 2011) of WB DPO (FY09-11 total assets of the banking system 27Will not necessarily translate into an increase in ranking as countries are ranked relative to other country's performance. 54 Selected World Bank Key Issues CAS Outcome CAS Liberia PRSP objectives Group/ADB & indicators26 from PRSP & Indicators Milestones Instruments Labor and Employment - Employment 6. Increased access to social Employment generation Ongoing Projects: Promote productive · Current labor administration protection and social services in Cash for work program operational with Community Empowerment employment that will reduce programs have limited the face of shocks >17,000 vulnerable households benefiting by Project II (FY07 + FY08)) 2010 (WB) poverty, ensure peace and impact and lack Health System stability, and enhance the coordination. Employment generation 1000 adolescent girls in the Monrovia area Reconstruction (FY07) overall well-being of the · Unequal and limited 6.1 680,000 person days (WB) and opportunities for women, 453,800 person days (ADB) have received training relevant for business Liberian population youth and persons with generated through labor intensive employment by 2010 (WB) AfDB Labor-based Public disabilities works Works Program Indicators: 50% of road maintenance contracts use LB Employment rate (TBD) · Inadequate and inappropriate methods supervised by the MPW (ADB) EIPSC/TSF skills and knowledge in the 6.2 More than 2,500 direct and indirect permanent jobs created Wage employment in the non- labor force by 2010 (ADB) Food security Agriculture and agricultural sector (TBD) School-feeding program operational in five Infrastructure Development Food Security Food security counties in South East Liberia for the school Project (FY08) Agriculture and Food · High levels of food 6.3. 62,000 pre-school and primary year 2008/09 (WB) Security - Revitalize the insecurity and child Food Support for Vulnerable malnutrition impede school children from vulnerable food and agricultural sector Social Services Women and Children (FY08) socioeconomic development households in 3 targeted districts to contribute to shared, 25 targeted clinics with a minimum set of and poverty reduction. receiving meals on a daily basis inclusive and sustainable at school in 2008/9 (WB) equipment by 2011 (WB) Pipeline Projects: Economic empowerment of economic growth and 20 schools and health facilities rehabilitated adolescent girls (FY09) development; provide food by 2010 (ADB) security and nutrition; ADB Agriculture Sector increase employment and 90% of the at least 80 sub-projects undertaken Rehabilitation (FY09) income and measurably under CEP II reflect beneficiary priorities reduce poverty. (WB) 55 Annex 2: Draft Liberia CAS M&E Plan CAS Outcomes and Base- 2009 2010 2011 Source/ Frequency Responsible Agency Indicators line Definition: Agency/ M&E Capacity and Intervention Systems 1. Improved efficiency of budget preparation and execution and enhanced revenue administration 1.1 Days to process payment 14 10 7 4 Regular BGA reporting Semi-Annually Ministry of MOF is emphasizing vouchers Finance, transparency in budget % of vouchers that can be 60% 75% 80% >80% Cash Management Dept. of management and execution. approved and paid by MOF (2006) Committee Reports Accounting Monitoring is an integral part of the MOF One of the published IFMIS /EGIRP Departmental work. World performance benchmarks projects Bank has supported a 2007 of MOF PEFA assessment which Timing of posting of quarterly 3 6 weeks 6 weeks 6 weeks MOF Quarterly Outturn Quarterly Ministry of provides baseline data. expenditure reports months after after after Reports Finance Dept. of World Bank is supporting after end of end of end of Expenditure MOF capacity building end of quarter quarter quarter PEFA Indicator (including monitoring) quarter EGIRP through the Resource Number of modules of IFMIS 0 3 IFMIS Progress Reports Semi-Annually Project/IFMIS Management Unit. system operational Project % of public procurement that >80% <60% <20% <20% Public Procurement and Annually PPC One of PPCs core functions used direct contracting and/or Concessions is monitoring of the public less competitive methods without Commission Public Proc. procurement system. A proper justification (PPC)Monitoring Reform Project system for monitoring is Report/PPC Survey currently being established with support from the WB. Number of Ministries with audits 0 5 ADB produced by General Auditor Institutional submitted to the parliament Support Project Number of Ministries with 0 3 internal audits produced Macro-fiscal unit performs No Yes functions linking budget to Medium Term Fiscal Framework 56 CAS Outcomes and Base- 2009 2010 2011 Source/ Frequency Responsible Agency Indicators line Definition: Agency/ M&E Capacity and Intervention Systems 1.2 % of revenue captured in System 30% 40% 50% ITAS, Annual Fiscal Annually Ministry of IMF supports production of the Integrated Tax not in Reports Finance, macro-economic data. It is Administration System place Dept. of expected that the ITAS Computerized Integrated Tax No No Yes Yes ITAS Progress Reports Semi- Revenue reporting system will be Administration System Annually able to generate the operational EGIRP Project monitoring data required. Tax administration risk No Yes ADB management systems Institutional implemented and post audit Support Project systems enhanced 2. Increased professionalization and improved HR management of the civil service 2.1 % of SES staff who are rated n/a 35% Reports of the Civil Annual Civil Service DfID and the WB is satisfactory in terms of Service Agency/ Agency supporting CSA performance against targets in Annual Performance performance contracts are Assessments of SESers SES Project retained in the civil service at the end of their contract. 2.2 % of SES staff builds 0 10% 35% SES Progress Reports Quarterly sustainable capacity for improved management of government functions by effectively training and nurturing and least one staff during the time of their contract. # of staff recruited under Senior 0 >70 90 100 SES Progress Reports Quarterly Executive Service Scheme (SES) A system of performance 0% Initial Pilot in 100 % CSA Progress Reports Quarterly evaluation based on merit is design one designed and closely linked to instituti compensation and promotion on systems. # of Ministries that implement 0 2 3 Reports of the Civil Quarterly restructuring plans based on Service Agency redefined mandates, new 57 CAS Outcomes and Base- 2009 2010 2011 Source/ Frequency Responsible Agency Indicators line Definition: Agency/ M&E Capacity and Intervention Systems organizational structures and matching staffing plans Civil Service Reform Strategy in No Yes place Development of a plan for Plan 15 staff 25 staff Quarterly Reports and Bi-Annually LIPA LIPA's training delivery and availabl trained trained Graduation Reports EGIRP project 25MDA staff trained e 2.3 Discrepancy between nominal 25% 5% 2% 1% CSA Progress Report Quarterly and actual payroll Civil Service Agency % of personnel file including 0% 100% 100% 100% Employee roll Annually biometric information Civil Service Rationalization of civil service No Yes New Pay Grading Once Reform/EGIRP grades and development of a System well defined salary structure. Civil Service Retirement age and rules are <5% 80% 100% Employee roll and Annually Reform/LICUS enforced 100% of the time. payroll 3. Improved access to key infrastructure services Transport 3.1 % reduction in travel time Tbd 5 20 20 Survey/MPW reports Annual Ministry of The selected indicators and between Monrovia ­ Ganta and Public Works milestones are relatively Cotton Tree - Buchanan simple to monitor and 3.2 Primary and feeder roads 25% 45% ADB Emergency consist mostly of outputs. rehabilitated and subject to Infrastructure Information will be sustainable maintenance Project collected as part of regular Monrovia ­ Ganta road No Yes project monitoring by the corridors under Output Based PIUs. At the same time, Road Performance Contract there will be an effort to Cotton Tree ­ Buchanan road No Yes strengthen the road network corridors under Output Based information system (as per Road Performance Contract the milestone in this regard) Draft legislation on No Yes Agriculture and to enable a more effective establishment of Road Authority Infrastructure and strategic management and Road Maintenance Fund Dev. Project of the road network 58 CAS Outcomes and Base- 2009 2010 2011 Source/ Frequency Responsible Agency Indicators line Definition: Agency/ M&E Capacity and Intervention Systems kms of Monrovia roads 0 24 Agriculture and development. resurfaced Infrastructure Dev. Project New Vai Town and Caldwell No Yes Certificate of works Once Agriculture and Bridges built Infrastructure # of minor river crossings built 0 10 >30 >35 Dev. Project or improved kms of roads maintained by 2009 600 Agriculture and Infrastructure Dev. Project Kms of rural feeder roads 0 50 200 400 Emergency constructed and rehabilitated Infrastructure Project 0 600 Public Works Program (ADB) Kms of primary roads 125 Public Works rehabilitated using LB methods Program (ADB) Drainage points constructed 229 ADB 3.3 Moves/hr per crane in port of 3 5 7 8 National Port Authority Quarterly National Port Monrovia Statistics Authority 70% of the general cargo No Yes operations by professional Agriculture and terminal operator Infrastructure Landlord Port Authority No Yes Dev. Project established Water and Sanitation (Monrovia) 3.4 Number of people served Tbd 350,000 700,000 LWSC with safe drinking water increased Monrovia Water Number of household water 17,900 50,000 Supply and connections in Monrovia Sanitation km of transmission mains 0 75 Rehabilitation rehabilitated Program (ADB) kms of distribution lines 0 200 59 CAS Outcomes and Base- 2009 2010 2011 Source/ Frequency Responsible Agency Indicators line Definition: Agency/ M&E Capacity and Intervention Systems rehabilitated Treated water volume at 2 4 6 8 Operating reports of Monthly LWSC Monrovia plant increased LWSC Agriculture and Infrastructure Dev. Project 3.5 Number of people with Tbd 300,000 LWSC access to sanitation facilities increased AfDB Monrovia # of sewage stabilisation pond 1 Water Supply # of public toilets, 0 31 and Sanitation rehabilitated/constructed Rehabilitation Program % of solid waste disposed of in 25% 40% Monrovia Urban a sanitary manner annually Infrastructure Emergency Project Energy 3.6 Number of connections to 350 350 3600 7000 GPOBA The connections are being the electricity grid Improved tracked as part of an output electricity access based grant scheme. for Liberia Selection of a Management No Yes IFC Program to Contractor for the Monrovia Implement Public system Private Partnership in the Monrovia Power Sector WB Power Sector PRG (FY10) Special Purpose Company for No Yes Regional West regional transmission operation Africa Power Pool formed Project (FY10) Feasibility Study for the No Yes 60 CAS Outcomes and Base- 2009 2010 2011 Source/ Frequency Responsible Agency Indicators line Definition: Agency/ M&E Capacity and Intervention Systems interconnections between Liberia, Cote D'Ivoire, Guinea and Sierra Leone completed 4. Improved agricultural and natural resources management in a way that generates pro-poor growth 4.1 Yields of rice (kg/ha) 700 1,000 1,200 1,200 Crop Assessments Annual Ministry of Limited capacity in MoA to among beneficiary farmers Agriculture monitor agriculture sector (WB) Monitoring Unit strategy implementation and 4.2 Yields (ADB) results. Specific support to Irrigated rice (tons/ha) 1 1.5 Agriculture and strengthening the Upland rice (tons/ha) 0.7 1.2 Infrastructure Monitoring Unit is provided Maize (tons/ha) 1 1.5 Dev. Project by USAid and through the Cassava (tons/ha) 5 6.5 (WB) WB financed project. Number of markets where seed 3 7 7 10 Market Survey Annual rice is available ADB Agriculture Local seed multiplication facility No yes Sector established and produces 1000 Rehabilitation mt of certified seed Project # of markets 0 >3 LACE constructed/rehabilitated CEP II 4.3 Metric tons of cocoa sites 3,000 3,200 4,000 Export statistics Annual BIVAC Agriculture and Infrastructure Dev. Project Two new agricultural sector No Yes Agriculture and policies completed with results Infrastructure framework Dev. Project Reduced import tax on rice and Yes ADB Agriculture tariffs for agricultural inputs Sector Rehabilitation 4.4 All illegal concessions Capacity to monitor the cancelled and no forestry sector is weak but commercial logging outside Forestry Sector efforts are on-going to 61 CAS Outcomes and Base- 2009 2010 2011 Source/ Frequency Responsible Agency Indicators line Definition: Agency/ M&E Capacity and Intervention Systems of concession framework Management strengthen # of community forestry 0 2 Project) concessions Community Rights Law No Yes approved # of new Protected Areas 0 +3 Calculation of the carbon No Yes storage for Liberia 4.4 EITI compliant status No No No Yes As specified EITI Secretaria Monitoring of the CAS outcome indicator and EGIRP outputs straightforward. Large-scale exploration and No Yes Yes mining licenses issued through/ recorded in mining cadastre system Transparent and internationally No Yes Yes competitive mineral asset tendering procedures are consistently applied to all tendered out mineral concessions At least 2 reports of payments to and No Yes Audit Reports As specified Ministry of revenues received by the Finance Government for mining and minerals are published EGIRP Adopt environmental and social No Yes Yes management framework for minerals sector compliant with international good practices Policy framework for land tenure reform adopted 5. Improved business and investment climate 5.1 3-4 reforms related to Doing 62 CAS Outcomes and Base- 2009 2010 2011 Source/ Frequency Responsible Agency Indicators line Definition: Agency/ M&E Capacity and Intervention Systems Business indicators per year Creation of Liberia Better Yes Yes Yes Yes Business Forum (LBBF) A functioning forum with Yes Yes Yes operationally independent secretariat, staffed and funded Identification of barriers to Yes business formalization Redrafting Investment Code Yes Modern business registry Yes Yes implemented Business Reform Committee and 2 Liberian Better Business Forum reforms enacted 5.2 Increased access to credit 20,000 Total New accounts for microenterprises and new (from inception) microenterpreneurs (tbd) account managed by AccessBank Liberia by June 201 Creation of at least one 1 commercial micro-finance bank Functioning one stop shop for Yes customs facility 6. Increase access to social services and Social Protection in the Face of Shocks 6.1 # of person days generated 320,000 360,000 CEP II ­ AF through labor intensive (emergency food works crisis response) 453,800 AfDB Labor- based Public Works Program 6.2 # of direct and indirect 2,500 AfDB Labor- permanent jobs created based Public Works Program # of vulnerable households 0 5,000 17,000 LACE benefiting from labor-intensive 63 CAS Outcomes and Base- 2009 2010 2011 Source/ Frequency Responsible Agency Indicators line Definition: Agency/ M&E Capacity and Intervention Systems public works program CEP II # of adolescent girls in the 0 1000 Economic Monrovia area have received Empowerment of training adolescent girls % of road maintenance 50% contracts using LB methods 6.3 # of pre-school and primary 0 62,000 School Registers/Clinic Semi-annually WFP WFP has established school children from vulnerable registers mechanisms for collecting households in 3 targeted districts WFP monitoring Food Support for data related to its food receiving meals on a daily basis mechanisms Vulnerable distribution programs at school Women and (currently on-going). School feeding program No Yes Semi-annually Children Systems for monitoring of operational in five counties in food prices and South East Liberia for the school vulnerability are being put year 2008/09 in place by MoA/WFP. # of targeted clinics with a tbd tbd tbd tbd Administration records Annually MOHSW Some health information minimum set of equipment Department of systems in place, but Health Services weaknesses in collecting and analyzing data. TA Health System provided by Clinton Reconstruction Foundation, DFID Project (financial), and WHO. WB project provides financing for IT for HMIS. System expected to be functional by end of WB project. # of schools and health facilities 0 20 Labor-based rehabilitated Public Works Program % of CEP II sub-projects Beneficiary Survey Bi-annual 0 90% 90% 90% reflecting beneficiary priorities 64 Annex 3: Liberia World Bank Portfolio and Pipeline (including Trust Funds) Liberia: World Bank Active Portfolio Data as of February 10, 2009 (in USD million) Funding Grant Disbursements. Pipeline Source Implementation Project Name Amount to Date Amount Economic Revitalization DRF Country-Ex Liberia Debt Preparation 1.30 0.55 Consolidation of Liberia Protected Area GEF Country-Ex Network Project (COPAN) 0.75 0.10 Fauna & Flora Biodiversity Conservation in SAPO 0.975 0.78 IDA Country-Ex Economic Governance & Institutional Reform 11.00 2.00 LICUS II Country-Ex Procurement Reform 1.10 1.10 UNDP PFM Capacity Building 2.50 1.56 TFLIB UNDP Development Forestry Sector 2.00 1.29 TFESSD Bank-Ex Land Tenure & Sustainable Livelihoods 0.12 0.12 19.75 7.50 Governance/Rule of Law LICUS I ILAC Capacity Building for Judicial Services 0.75 0.16 LICUS III Bank-Ex TA Civil Service Reform 0.90 0.39 Country-Ex Support to PRSP Preparation 0.72 0.54 TFLIB Country-Ex Emergency Senior Executive Service 2.30 0.53 4.67 1.62 Infrastructure/Basic Services EITI TF Country-Ex Support to the Implementation of EITI 0.40 0.10 CEP Public Works ­ Additional Financing FPCR TF Country-Ex (Food Crisis) 3.00 0.85 Food Price Crisis Agricultural Productivity Support (Food Crisis) 3.00 0 Food Support for Vulnerable Women & Country-Ex/WFP Children (Food Crisis) 4.00 2.00 IDA Pre- arrears Country-Ex Agriculture & Infrastructure Development Proj. 37.00 2.50 Community Empowerment II 5.00 1.15 Emergency Infrastructure ERL 46.50 40.25 Health Systems Reconstruction 8.50 1.21 LICUS II UNDP Transition Support Fund 8.50 8.50 TFLIB Bank-Ex TA Infrastructure TA 5.00 3.79 Country-Ex Community Empowerment 6.00 6.00 Infrastructure Rehabilitation Project 8.50 8.50 EFA FTIE Bank-Ex TA Education Sector Strategy & EFA Plan 0.76 0.55 (blank) Country-Ex Vulnerable Youth Sexual/Reproduction Health 0.47 0.0 65 136.63 75.40 Multi-Sectoral LICUS II UNDP Transition Support Fund 0.60 0.60 0.60 0.60 Pipeline Carbon Fund REDD Readiness Plan 0.65 IDA Country-Ex Budget Support 15.00 Transport 96.00 Growth/Agriculture 12.00 Energy (Country IDA + Regional IDA) 15.00 MDTF Country-Ex Liberia Reconstruction Trust Fund (LRTF) 120.00 State and Peace building Trust fund 2.00 TFLIB UNDP IFMIS (OP 8.0) 3.00 268.65 Grand Total 161.65 85.12 268.65 66 Annex 4: Summary of Non-Lending Services As of Date Feb. 10, 2009 Product Completion FY Cost (US$000) Audiencea Objectiveb Recent Completions Telecom Sector Reform 2007 78 G/D/B/P K/PD/PS DTIS Trade 2008 123 G/D/B/P K Agriculture Sector Review 2008 112 G/D/B/P K Land Tenure and Sustainable Development 2008 175 G/D/B/P K/PS PEFA 2009 80 G/D/B/P K/PS Underway PEMFAR 2009 208 G/D/B/P K/PS Oil Palm Sector Study 2009 100 G/D/B K/PS Policy Note on Pro-poor growth 2009 50 Planned Policy Notes (e.g. macro, fiscal decentralization, agriculture and social protection) 2010 50 G/D/B K/PS Education Sector Plan 2010 75 G/D/B/P K/PD/PS Poverty Assessment 2010 150 G/D/B/P K/PD/PS Mineral Sector Review 2010 75 G/D/B/P K/PD/PS Financial Sector Revitalization Strategy 2010 120 G/D/B K/PD/PS Women's Economic Empowerment 2010 110 G/D/B/P K/PD/PS EITI ++ Scoping Study 2010 50 G/D/B K/PS Energy and Electricity Strategy 2010 ____________ a. Government, donor, Bank, public dissemination. b. Knowledge generation, public debate, problem-solving. 67 Annex 5: Selected Indicators of Bank Portfolio Performance and Management (As of Date 02/09/2009) Indicator 2006 2007 2008 2009 Portfolio Assessment Number of Projects Under Implementation a 1 6 10 10 Average Implementation Period (years) b 0.0 0.8 1.3 1.9 Percent of Problem Projects by Number a, c 0.0 0.0 0.0 10.0 Percent of Problem Projects by Amount a, c 0.0 0.0 0.0 6.5 Percent of Projects at Risk by Number a, d 0.0 16.7 10.0 20.0 Percent of Projects at Risk by Amount a, d 0.0 60.8 35.6 42.0 Disbursement Ratio (%) e 0.0 33.6 54.7 26.2 Portfolio Management CPPR during the year (yes/no) Supervision Resources (total US$) Average Supervision (US$/project) Last Five Memorandum Item Since FY 80 FYs Proj Eval by OED by Number 25 0 Proj Eval by OED by Amt (US$ millions) 195.2 0.0 % of OED Projects Rated U or HU by Number 52.0 0.0 % of OED Projects Rated U or HU by Amt 47.4 0.0 a. As shown in the Annual Report on Portfolio Performance (except for current FY). b. Average age of projects in the Bank's country portfolio. c. Percent of projects rated U or HU on development objectives (DO) and/or implementation progress (IP). d. As defined under the Portfolio Improvement Program. e. Ratio of disbursements during the year to the undisbursed balance of the Bank's portfolio at the beginning of the year: Investment projects only. * All indicators are for projects active in the Portfolio, with the exception of Disbursement Ratio, which includes all active projects as well as projects which exited during the fiscal year. 68 Annex 6: Liberia at a Glance Liberia at a glance 9/16/08 Sub- Key Development Indicators Saharan Low Liberia Africa income Age distribution, 2007 (2007) Ma le Fe male Population, mid-year (millions) 3.8 800 1,296 75-79 Surface area (thousand sq. km) 111 24,242 21,846 Population growth (%) 4.8 2.4 2.1 60-64 Urban population(% of total population) 59 36 32 45-49 GNI (Atlas method, US$ billions) 0.6 762 749 30-34 GNI percapita (Atlas method, US$) 150 952 578 15-19 GNI percapita (PPP, international $) 290 1,870 1,500 0-4 GDP growth (%) 9.4 6.2 6.5 30 20 10 0 10 20 30 GDP per capita growth (%) 4.3 3.7 4.3 perce nt (most recent estimate, 2000­2007) Poverty headcount ratio at $1.25 a day (PPP, %) .. 50 .. Under-5 mortalityrate (per 1,000) Poverty headcount ratio at $2.00 a day (PPP, %) .. 72 .. Life expectancy at birth (years) 45 50 57 250 Infant mortality (per 1,000 live births) 157 94 85 Child malnutrition (% of children under 5) 23 27 29 200 Adult literacy, male (% of ages 15 and older) 58 69 72 150 Adult literacy, female (% of ages 15 and older) 46 50 50 100 Gross primary enrollment, male (% of age group) 96 99 100 Gross primary enrollment, female (% of age group) 87 88 89 50 Access to an improved water source (% of population) 64 58 68 0 Access to improved sanitation facilities (% of population) 1990 1995 2000 2006 32 31 39 L ib eria Su b-Saharan Africa Net Aid Flows 1980 1990 2000 2007 a (US$ milli ons) Net ODA and official aid 97 114 67 269 Growth of GDP and GDP per capita (%) Top 3 donors (in 2006): UnitedStates 32 19 16 88 150 European Commission 4 8 13 44 100 Japan 14 6 0 17 50 Aid (% of GNI) 10.4 10.2 17.4 56.3 0 Aid per capita(US$) 52 53 22 75 -50 Long-Term Economic Trends -100 95 05 Consumer prices (annual %change) 14.7 9.1 12.1 15.0 GDP implicit deflator (annual % change) 9.1 -0.2 -1.3 14.0 GDP GDP pe r ca pita Exchange rate (annual average, local per US$) 1.0 1.0 41.0 61.3 Terms of trade index (2000 = 100) .. .. .. .. 1980­90 1990­2000 2000­07 (ave rage annual gro wth %) Population, mid-year (millions) 1.9 2.1 3.1 3.8 1.3 3.6 2.9 GDP (US$ millions) 954 384 561 725 -7.0 4.1 -2.7 (% of GDP) Agriculture 32.2 54.4 72.0 65.8 .. .. .. Industry 25.2 16.8 11.6 15.7 .. .. .. Manufacturing 6.9 .. 9.5 12.4 .. .. .. Services 32.3 28.8 16.4 18.4 .. .. .. Household final consumption expenditure 66.1 .. 89.1 86.4 .. .. .. General gov't final consumption expenditure 19.1 .. 14.4 11.1 .. .. .. Gross capital formation .. .. 4.9 16.4 .. .. .. Exports of goods and services 64.3 .. 21.5 25.4 .. .. .. Imports of goods and services 64.4 .. 26.0 64.5 .. .. .. Gross savings .. .. -21.4 39.8 Note: Figures in italics arefor years other than those specified. 2007 data are preliminary. .. indicates dataare not available. a. Aid data are for 2006. Development Economics, Development Data Group (DECDG). 69 Liberia at a Glance (cont.) Liberia Balance of Payments and Trade 2000 2007 Governance indicators, 2000 and 2007 (US$ millions) Total merchandise exports (fob) 120 41 Total merchandise imports (cif) 182 142 Voice and accountab ility Net trade in goods and services -25 -283 Politic al stab ility Workers' remittances and compensation of employees (receipts) .. 685 Reg ulatory q ua lity R ule of law Current account balance -131 -106 as a % of GDP -23.3 -14.6 Con tro l of co rru ptio n Reserves, including gold 2 10 0 25 50 75 100 20 07 Central Government Finance Co untry's p ercentile ran k (0-10 0) 20 00 higher v alues imply better ratin gs (% of GDP) Source: Kaufman n-Kraay-Mastruzzi, World Bank Current revenue (including grants) 12.8 5.4 Tax revenue .. .. Current expenditure 7.5 5.3 Technology and Infrastructure 2000 2007 Overall surplus/deficit -0.7 -0.9 Paved roads (% of total) 6.2 .. Highest marginal tax rate (%) Fixed line and mobile phone Individual .. .. subscribers (per 1,000 people) 0 .. Corporate .. .. High technology exports (% of manufactured exports) .. .. External Debt and Resource Flows Environment (US$ millions) Total debt outstanding and disbursed 2,032 2,674 Agricultural land (% of land area) 27 27 Total debt service 1 1 Forest area (% of land area) 35.9 32.7 Debt relief (HIPC, MDRI) ­ ­ Nationally protected areas (% of land area) .. 15.8 Total debt (% of GDP) 362.2 435.5 Freshwater resources per capita (cu. meters) .. 58,109 Total debt service (% of exports) 0.5 0.5 Freshwater withdrawal (% of internal resources) 0.1 .. Foreign direct investment (net inflows) 21 -82 CO2 emissions per capita (mt) 0.14 0.14 Portfolio equity (net inflows) 0 0 GDP per unit of energy use (2005 PPP $ per kg of oil equivalent) .. .. Composition of total external debt, 2006 Energy use per capita (kg of oil equivalent) .. .. IB RD, 147 IDA, 109 World Bank Group portfolio 2000 2007 IM F, 336 (US$ millions) Short-term, 1,223 Other multi- IBRD lateral, 169 Total debt outstanding and disbursed 130 147 Disbursements 0 0 Bilateral, 493 Principalrepayments 0 0 P riv ate, 199 Interest payments 0 0 US$ millio ns IDA Total debt outstanding and disbursed 100 109 Disbursements 0 0 Private Sector Development 2000 2008 Total debt service 0 0 Time required to start a business (days) ­ 27 IFC (fiscal year) Cost to start a business (% of GNI per capita) ­ 100.2 Total disbursed and outstanding portfolio 4 0 Time required to register property (days) ­ 50 of which IFC own account 4 0 Disbursements for IFC own account 4 0 Ranked as a major constraint to business 2000 2007 Portfolio sales, prepayments and (% of managers surveyed who agreed) repayments for IFC own account 0 0 n.a. .. .. n.a. .. .. MIGA Gross exposure ­ ­ Stock market capitalization (% of GDP) .. .. New guarantees ­ ­ Bank capital to asset ratio (%) .. .. Note: Figures in italics are for years other than those specified. 2007 data are preliminary. 9/16/08 .. indicates data are not available. ­ indicates observation is not applicable. Development Economics, Development Data Group (DECDG). 70 Liberia at a Glance (cont.) Millennium Development Goals Liberi With selected targets to achieve between 1990 and 2015 (estimate closest to date shown, +/- 2 years) Liberia Goal 1: halve the rates for extreme poverty and malnutrition 1990 1995 2000 2007 Poverty headcount ratio at $1.25 a day (PPP, % of population) .. .. .. .. Poverty headcount ratio at national poverty line (%of population) .. .. .. .. Share of income or consumption to the poorest qunitile (%) .. .. .. .. Prevalence of malnutrition (% of children under 5) .. .. 22.8 .. Goal 2: ensure that children are able to complete primary schooling Primary school enrollment (net, %) .. .. 66 39 Primary completion rate (% of relevant age group) .. .. .. 63 Secondary school enrollment (gross, %) .. .. 32 .. Youth literacy rate (% of people ages 15-24) .. 51 .. 67 Goal 3: eliminate gender disparity in education and empower women Ratio of girls to boys in primary and secondary education (%) .. .. 73 .. Women employed in the nonagricultural sector (% of nonagricultural employm ent) .. .. 11 .. Proportion of seats held by women in national parliament (%) .. 6 8 13 Goal 4: reduce under-5 mortalityby two-thirds Under-5 mortality rate (per 1,000) 235 235 235 235 Infant mortality rate (per 1,000 live births) 157 157 157 157 Measles immunization (proportion of one-year olds immunized, %) .. .. 52 94 Goal 5: reduce maternal mortality by three-fourths Maternal mortality ratio (modeled estimate, per 100,000 live births) .. .. .. 1,200 Births attended by skilled health staff (% of total) .. .. 51 .. Contraceptive prevalence (% of wom en ages 15-49) .. .. 10 .. Goal 6: halt and beginto reverse the spread of HIV/AIDS and other majordiseases Prevalence of HIV (% of population ages 15-49) .. .. 1.4 1.7 Incidence of tuberculosis (per 100,000 people) 132 198 287 331 Tuberculosis cases detected under DOTS (%) .. 31 26 55 Goal 7: halve the proportion of people without sustainable access to basic needs Access to an improved water source (% of population) 57 61 63 64 Access to improved sanitation facilities (% of population) 40 36 32 32 Forest area (% of total land area) 42.1 .. 35.9 32.7 Nationally protected areas (% of total land area) .. .. .. 15.8 CO2 emissions (metric tons per capita) 0.2 0.2 0.1 0.1 GDP per unit of energy use (constant 2005 PPP $ per kg of oil equivalent) .. .. .. .. Goal 8: develop a globalpartnership for development Telephone mainlines (per 100 people) 0.4 0.2 0.2 .. Mobile phone subscribers (per 100 people) 0.0 0.0 0.0 15.0 Internet users (per 100 people) 0.0 0.0 0.0 0.0 Personal computers (per 100 people) .. .. .. .. Education indicators (%) Measles immunization (% of 1-year olds) ICT indicators (per 1,000 people) 100 100 4 75 75 3 50 50 2 25 25 1 0 2000 2002 2004 2006 0 0 1990 1995 2000 2006 2000 2002 2004 2006 P rim ary n et en rollmen tra tio Fixe d + mob ile su bscribers R atio o fg irls to b oys in prim ary & Libe ria Sub-Saha ran Afric a In ternet u se rs s ec ond ary e ducation Note: Figures in italics are for years other than those specified. .. indicates data are not available. 9/16/08 Development Economics, Development Data Group (DECDG). 71 Annex 7: Liberia Social and Economic Indicators Liberia Social Indicators Same region/income Latest single year group Sub- Saharan Low- 1980-85 1990-95 2001-07 Africa income POPULATION Total population, mid-year (millions) 2.2 2.1 3.8 799.8 1,295.7 Growth rate (% annual average for period) 3.0 0.1 2.8 2.5 2.2 Urban population (% of population) 40.3 50.0 59.5 35.9 31.7 Total fertility rate (births per woman) 6.9 6.8 6.8 5.2 4.3 POVERTY (% of population) National headcount index .. .. .. .. .. Urban headcount index .. .. .. .. .. Rural headcount index .. .. .. .. .. INCOME GNI per capita (US$) 360 .. 150 952 578 Consumer price index (2000=100) 100 .. .. 137 150 Food price index (2000=100) .. .. .. .. .. INCOME/CONSUMPTION DISTRIBUTION Gini index .. .. .. .. .. Lowest quintile (% of income or consumption) .. .. .. .. .. Highest quintile (% of income or consumption) .. .. .. .. .. SOCIAL INDICATORS Public expenditure Health (% of GDP) .. .. 4.4 2.6 1.5 Education (% of GDP) .. .. .. 4.2 .. Net primary school enrollment rate (% of age group) Total .. .. 39 70 73 Male .. .. 40 72 76 Female .. .. 39 67 69 Access to an improved water source (% of population) Total .. 61 64 58 68 Urban .. 80 72 81 84 Rural .. 42 52 46 60 Immunization rate (% of children ages 12-23 months) Measles .. .. 94 72 76 72 DPT .. .. 88 73 77 Child malnutrition (% under 5 years) .. .. .. 27 29 Life expectancy at birth (years) Total 46 42 45 50 57 Male 44 40 44 49 56 Female 47 43 46 52 58 Mortality Infant (per 1,000 live births) 157 157 157 94 85 Under 5 (per 1,000) 235 235 235 157 135 Adult (15-59) Male (per 1,000 population) 268 .. 466 421 310 Female (per 1,000 population) 185 .. 430 391 272 Maternal (modeled, per 100,000 live births) .. .. 1,200 900 780 Births attended by skilled health staff (%) .. .. .. 45 41 Note: 0 or 0.0 means zero or less than half the unit shown. Net enrollment rate: break in series between 1997 and 1998 due to change from ISCED76 to ISCED97. Immunization: refers to children ages 12-23 months who received vaccinations before one year of age or at any time before the survey. World Development Indicators database, World Bank - 10 September 2008. 73 Annex 8. Liberia - Key Exposure Indicators Estimat Project ed ed 201 Indicator 2006 2007 2008 2009 0 2011 5032. 4201. 4134. 135. Total debt outstanding and disbursed (TDO) (US$m)a 0 0 4036.0 0 0 142.0 Net disbursements (US$m)a -5.0 -5.0 -14.0 -10.0 ..1/ 16.0 Total debt service (after debt relief) (TDS) (US$m)a 0.0 0.0 1.2 1.7 1.1 9.6 Debt and debt service indicators (%) 1010. TDO/XGSb 0 758.0 619.0 610.0 18.0 7.0 TDO/GDP 823.0 572.0 483.0 500.0 15.0 9.0 TDS/XGS (after debt relief) .. 0.0 0.2 0.3 0.1 1.1 Concessional/TDO .. .. .. .. .. .. IBRD exposure indicators (%) IBRD DS/public DS 0.0 0.0 0.0 0.0 0.0 0.0 Preferred creditor DS/public DS (%)c .. .. .. .. .. .. IBRD DS/XGS 0.0 0.0 0.0 0.0 0.0 0.0 IBRD TDO (US$m)d 152.0 0.0 0.0 0.0 0.0 0.0 Of which present value of guarantees (US$m) Share of IBRD portfolio (%) 0.1 0.0 0.0 0.0 0.0 0.0 103. IDA TDO (US$m)d 109.0 77.0 72.0 85.0 0 127.0 IFC (US$m) Loans 0.0 0.0 4.8 .. .. .. Equity and quasi-equity /c MIGA MIGA guarantees (US$m) a. Includes public and publicly guaranteed debt, private nonguaranteed, use of IMF credits and net short- term capital. b. "XGS" denotes exports of goods and services, including workers' remittances. c. Preferred creditors are defined as IBRD, IDA, the regional multilateral development banks, the IMF, and the Bank for International Settlements. d. Includes present value of guarantees. e. Includes equity and quasi-equity types of both loan and equity instruments. 1/ Subject to Completion Point debt relief 74 Annex 9: IBRD/IDA Program Summary Proposed IBRD/IDA Base-Case Lending Program a Fiscal Strategic Rewards Implementation b Proj ID US$(M) year b (H/M/L) Risks (H/M/L) 2009 Urban and Rural Infrastructure Rehabilitation I 67.3 H H Budget Support 4.0 H H Result 71.3 Urban and Rural Infrastructure Rehabilitation - 2010 8.5 H H Additional Financing Growth/ Agriculture 12.0 H H Budget Support 5.0 H H Result 25.5 2011 Urban and Rural Infrastructure Rehabilitation II 20.2 H H Energy 15.0 H H Budget Support 6.0 H H Result 41.2 Overall Result 138.0 75 Annex 10: CAS Annex B3 (IFC & MIGA) for Liberia Liberia: IFC Investment Operations Program 2006 2007 2008 2009* Commitments (US$m) Gross 0.25 11.5 Net** 0.25 11.5 Net Commitments by Sector (%) Agribusiness 86.7 Financial Markets 100 13.3 Total 0 0 100 100 Net Commitments by Investment Instrument (%) Equity 9.4 Guarantee 100 3.9 Loan 86.7 Total 0 0 100 100 * As of February 11, 2009 ** IFC's Own Account only MIGA Outstanding Exposure (Gross Exposure, $ million) As of end of fiscal year FY02 FY03 FY04 FY05 FY06 FY07FY08 FY09 through 31-Jan- 09 Guaranteed Investments into Liberia 0 0 0 0 0 0 0 0 Guaranteed Investment Financed by Liberian Investors 0 0 0 0 0 0 0 76 Annex 11: IFC's Committed and Outstanding Portfolio Liberia Committed and Disbursed Outstanding Investment Portfolio As of 01/31/2009 (In USD Millions) Committed Disbursed Outstanding **Quasi **Quasi FY Approval Company Loan Equity Equity *GT/RM Participant Loan Equity Equity *GT/RM Participant 2008 Access Liberia 0 1.08 0 0 0 0 1.08 0 0 0 2009 Shalala rubber 10 0 0 0 0 3 0 0 0 0 Total Portfolio: 10 1.08 0 0 0 3 1.08 0 0 0 * Denotes Guarantee and Risk Management Products. ** Quasi Equity includes both loan and equity types. 77 Annex 12: Operations Portfolio (IBRD/IDA and Grants) 78 Annex 13: Liberia: Country Financing Parameters 1. This note describes the application of the policy for expenditure eligibility in World Bank financing to the Liberia program and proposes a corresponding set of country financing parameters. The Government of Liberia has been consulted and welcomes the increased flexibility the parameters would provide. I. BACKGROUND 2. Liberia has embarked on the process of recovery from a devastating 14-year civil war. In January 2006, an elected government headed by a strong reformer, Ellen Johnson-Sirleaf, came to power, after a two-year transitional appointed government ­ the National Transitional Government of Liberia (NTGL). The new government has firmly demonstrated its commitment to reform, agreeing on implementation of the Governance and Economic Management Assistance Program (GEMAP), which has instituted strong expenditure controls in the Ministry of Finance, as well as introduced a zero- tolerance policy on corruption. The government is making good progress towards these reforms and donors are beginning to implement projects using the government's system. 3. Accrual Status. Liberia entered accrual status in December 2007, after clearing arrears to the Bank. Prior to arrears clearance, Liberia has been in non-accrual status since 1987, and as a result has been receiving a combination of financing from the LICUS Trust Fund, the special Trust Fund for Liberia (TIFLIB)28, as well as an IDA pre-arrears clearance grant. 4. Fiscal and Debt Situation. The government budget has risen rapidly during the reconstruction period, from US$80 million in 2005/06 to an estimated US$199 million in 2007/08, but per capita public expenditure remains extremely low and most aid flows are external to the budget. Although there have been significant improvements, the public financial management system remains weak. Total revenue excluding grants was US$85 million (14.8 percent of GDP) in 2005/06, rose to US$147 million (21.9 percent of GDP) in 2006/07, and is projected to rise to over US$186 million (24 percent of GDP) in 2007/08. As the government functions on a cash basis, this also sets a ceiling on expenditures. Capital expenditures are low, and the majority of investment expenditure is financed by foreign development assistance. However, revenues are expected to continue growing rapidly as the lifting of UN timber sanctions in 2006 is expected to contribute to additional increase in government revenues from timber exports when production fully resumes in 2008, and a large iron-ore mining operation is projected to come on stream by late 2010. 5. Following the war, the government inherited large external and domestic debts. The external debt was estimated at US$4.8 billion (almost 700 percent of GDP). The value of all outstanding domestic claims was US$914 million in January 2007. The government has made substantial progress towards a resolution of its unsustainable debt burden. Liberia cleared its arrears to the World Bank and African Development Bank in December 2007 and entered a PRGF/EFF program with the IMF in March 2008, enabling Liberia to access funds to clear its arrears to the IMF, thereby, restoring its drawing and 28The TFLIB was approved by the Board in 2004, with $25 million funded out of the Bank's net income; see World Bank Assistance to Liberia: Proposed Establishment of a Trust Fund for Liberia, (IDA/R2004-0211) August 9, 2004. Its aim is to provide support for infrastructure, service delivery, and a distance learning center. 79 voting rights, and reaching the Decision Point under the Enhanced HIPC Initiative. The HIPC Initiative will enable the government to access debt relief from multilateral donors. 6. Public Financial Management. The government has taken significant steps to improve fiscal management. The interministerial Cash Management Committee (CMC) and the payment process of which it is part have been strengthened, introducing signature accountability for authorizations at every step from the budget to the final payment. To accompany a new procurement law that decentralizes procurement to the line ministries, procurement agents in these ministries have been trained in public financial management. This has resulted in a more efficient authorization process with fewer documents being rejected by the CMC as incomplete or not justified by the annual budget. Transparency is assured by the oversight of GEMAP experts within the Bureau of the Budget, the Ministry of Finance, and the CBL, thus assuring that the integrity of the chain of expenditures has been established and maintained. The draft budget, the final budget, quarterly budget execution reports and annual fiscal outturn reports are published on the web site of the Ministry of Finance, as are monthly revenue outturns and the regular financial reports of the SOEs. Similarly, reports by those revenue generating institutions covered by GEMAP are published on the GEMAP website. 7. Donor Response. Weak governance during transitional appointed government led to an agreement in late 2005 among all major donors on the Governance and Economic Management Assistance Program (GEMAP)--a multi-donor mechanism to get basic public financial management controls in place and build government capacity to manage public finances. The World Bank, the US, and the EC are financing major components of the control mechanisms of the GEMAP, which has received strong support from the new President and her Cabinet. GEMAP­supported public financial management reforms have led to tangible increases in government revenue and increased transparency in the budget process. In addition, the government entered a three-year IMF Poverty Reduction and Growth Facility (PRGF) in March 2008, focusing on strengthening revenue collection and expenditure control. 8. Bank Strategy. The Bank's current operations in Liberia are guided by the Interim Strategy Note (ISN), approved by the Board on June 14, 2007. The ISN is aligned with the I-PRSP along three of its four pillars ­ economic revitalization, governance and rule of law, and infrastructure and basic services. The Bank is currently in the process of developing a three-year Country Assistance Strategy (CAS), building on the government's recently completed PRSP. 9. Bank Portfolio. The Bank currently has US$162 million in commitments with another US$400 million of Bank-managed projects in the pipeline from various financing sources29. With the completion of the CAS, the Bank is expecting an annual IDA allocation of approximately US$45 million. The existing portfolio includes US$126 million in infrastructure and basic services (road rehabilitation, port rehabilitation, energy, water urban works, health, education and community-driven development projects); US$17 million for economic revitalization projects (forestry, public financial management, procurement reform and budget support); and US$4.5 million for governance and judicial reform. 10. Pipeline. The tentative pipeline for the coming three years, totals around US$400 million is expected to focus heavily on infrastructure, including roads and bridge rehabilitation; with continued support to the public financial management reform program and a civil service reform program; support to the growth sectors to stimulate economic recovery (forestry, agriculture and mining) and some smaller support to social protection. 29This includes the expected IDA allocation, IDA regional financing, and LRTF donor contributions. 80 II. COUNTRY FINANCING PARAMETERS 11. Section II discusses the four components of country financing parameters (cost sharing, recurrent cost financing, local cost financing, and taxes and duties) as they apply to Liberia. A. Cost Sharing 12. In Liberia's fragile post-conflict environment, there is little scope at this time for Government to provide direct contributions to project financing. While it is feasible that some co-financing from other donors could be made available in some instances as a means of reducing the Bank's share in project financing, it is expected that flexibility to go up to 100 percent financing will be needed in all Bank- financed projects for the medium term. As public financial management reforms are implemented, aid begins to be channeled through the budget, and production of timber resumes with the lifting of UN sanctions, Government may have greater leeway for own-financing of its public expenditure program including development projects. 13. The Bank is now focusing on interventions that are reflected in the Government's PRS to ensure greater ownership of Bank-financed programs. At the project level, ownership is being ensured through close supervision and capacity-building of government institutions. A significant proportion of projects are now government executed, primarily through the Special Implementation Unit within the Ministry of Public Works, and Project Financial Management Unit within the Ministry of Finance. In addition, some projects work directly to strengthen government capacity, such as the Community Empowerment project financed by TFLIB, which is building the capacity of a new Liberian Community Empowerment Agency which is a national entity responsible for all community-driven development work in the country. B. Recurrent Cost Financing 14. It is expected that the government will request the Bank to finance recurrent costs in all projects implemented over the medium term. The majority of recurrent costs will finance external and domestic experts responsible for launching projects and for the capacity building required for eventual government takeover, in addition to general operating costs, including salaries for workers on projects. The upcoming IDA-financed infrastructure projects, the Economic Governance and Institutional Reform Project and other governance projects will all include these types of recurrent costs. The government's weak fiscal situation argues for Bank financing of recurrent costs simply to ensure sustainability of the Bank and government's development investments until the situation begins to normalize. 15. All World Bank financing over the next three years will take the form of IDA or trust fund grants, to avoid adding to Government's debt burden. Bank financing of recurrent costs per se would not have an adverse impact on the country's debt sustainability. Nonetheless, the Bank will continue to monitor the fiscal situation, public expenditure management, and public sector reforms to ensure that recurrent cost financing is embedded in a credible and sustainable government macroeconomic strategy. As the situation normalizes, the Bank will re-assess the need for Bank-financed recurrent costs, in order to ensure sustainability of Bank projects. 16. Based on the above assessment, no country-level limit is being set on recurrent cost financing. Recurrent costs may be financed as needed in individual projects, subject to project or program-level 81 assessment. In determining Bank financing of recurrent costs in individual projects, the Bank will take into account sustainability issues at the sector and project levels, including a consideration of implied future budgetary outlays. C. Local Cost Financing 17. The criteria for World Bank financing of local costs have been met. First, the recently completed PRSP estimates the financing needs for Liberia's reconstruction and development over the three-year PRS period to be approximately US$1.6 billion, which is well beyond the internal resources of the government. The government estimates that it will be able to commit US$510 million to PRS financing, leaving a financing gap of about US$1.1 billion. 18. Second, the financing of foreign expenditures alone would not enable the World Bank to assist in the financing of individual projects. The World Bank's current portfolio focuses primarily on projects in the infrastructure and social sectors, both of which have a high element of local expenditure. Further, the government is deeply concerned about unemployment and its potential threat to security and development, and has requested the Bank to support local employment creation through labor- intensive infrastructure construction, which necessitates a high proportion of local costs. Current infrastructure rehabilitation projects include local cost financing of approximately 25% of the total project amount. Thus, the World Bank may finance local costs in any proportions required by individual projects. D. Taxes and Duties 19. In design, Liberia has a reasonable tax system. Direct taxes include a progressive personal income tax beginning at 2 percent and capped at 35 percent, with withholding at source. Larger businesses face a company income tax of 30 percent; small businesses pay a 4 percent turnover tax while the smallest enterprises pay a fixed petty trader tax. However, in application, because of weak capability to collect direct taxes, government depends upon trade taxes for 48 percent of its tax revenue (2006/07). Customs duties provide the bulk of this revenue, and ranges from 2.5% to 25%. In addition, an export tax of 0-4 percent on exports, diamonds, and precious metals can be credited against income tax and thus serves as a partial palliative to poor tax collection. Since 2001 there has been a 7 percent tax on goods and services, although the government intends to progressively increase GST to 10% over three years starting in 2008/09. Table 2 provides a summary of the main tax rates. Bank financed projects are taxed at the same rates as the country's normal rates, or in some cases are exempted from taxes and duties. Table 2: Current Tax Rates Tax Rate Comments Personal Income 2 - 35% Business 4 - 30% Depending on size Customs 2.5 ­ 25% Excise 5 ­ 30% Special rate of 50% for arms and ammunition Real estate tax 1 ­ 2% Timber production Varies Varying levels for severance, reforestation, and conservation 82 20. In summary, taxes and duties have been assessed to be reasonable, and the Bank may finances taxes and duties associated with project expenditures. The application of this general approach will be subject to an ongoing monitoring of tax policy and how taxes are applied to Bank-financed projects. At the project level, the Bank would consider whether taxes and duties constitute an excessively high share of project costs. 83 Liberia: Country Financing Parameters Item Parameter Remarks/Explanation Cost Sharing: 100% All projects are expected to be financed at 100%, Limits on the proportion of given the government's extremely small budget individual project costs that IDA and inability to provide counterpart funding. In may finance. the near term, only when co-financing is available will IDA's share be less. Ownership of Bank- financed programs is being ensured through alignment of the Bank's program and the PRSP and through ongoing dialogue.. At the project level, ownership is being ensured through close supervision and capacity-building of government institutions. A significant proportion of projects are now government executed, primarily through the Special Implementation Unit within the Ministry of Public Works, and Project Financial Management Unit within the Ministry of Finance. Recurrent Cost Financing: No country- The Bank, working closely with the IMF, would Any limits that would apply to the level limit monitor the fiscal situation, and public overall amount of recurrent expenditure management and public sector expenditures that the Bank may reforms to ensure that recurrent cost financing is finance. embedded in a credible and sustainable government macroeconomic strategy. In determining Bank financing of recurrent costs in individual projects, the Bank will take into account sustainability issues at the sector and project levels, including a consideration of implied future budgetary outlays. Local Cost Financing: Yes The requirements for local cost financing are met. Are the requirements for IDA The Bank may finance local costs in any financing of local expenditures met, proportions required by individual projects. namely that: (i) financing requirements for the country's development program would exceed the public sector's own resources (e.g., from taxation and other revenues) and expected domestic borrowing; and (ii) the financing of foreign expenditures alone would not enable IDA to assist in the financing of individual projects? Taxes and Duties: No Taxes and duties are considered reasonable. The Are there any taxes and duties that application of this general approach will be the Bank would not finance? subject to an ongoing monitoring of tax policy and how taxes are applied to Bank-financed projects. At the project level, the Bank will consider whether taxes and duties constitute an excessively high share of project costs. 84 Annex 14: Joint Bank-Fund Debt Sustainability Analysis The low-income country debt sustainability analysis (LIC DSA) reveals that Liberia is in debt distress, emphasizing the need for debt relief.30 31 Under the alternative scenario which assumes full delivery of HIPC, MDRI and IMF beyond-HIPC32 debt relief at completion point, debt dynamics remain manageable, assuming moderate new borrowing, largely on concessional terms, and robust GDP growth. While domestic debt is substantial, the inclusion of domestic debt in the analysis does not significantly change the overall assessment of Liberia's debt sustainability. A. Introduction 1. The external and public sector LIC DSAs presented below are based on the common standard LIC DSA framework33, with some modifications to the stress tests to address data limitations in Liberia and the potential for domestic debt contingent liabilities to be realized.34 The DSAs present the projected path of Liberia's external and public sector debt burden indicators, and draw some conclusions on the forward-looking sustainability of debt. Methodologically, the LIC DSA differs from the HIPC Debt Relief Analysis (DRA) in that it compares the evolution over the projection period of debt-burden indicators (based on single-year denominators) against policy-dependent indicative thresholds. In contrast, under a HIPC DRA, the debt burden indicators (based on three-year backward- looking averages of denominators) are compared to uniform thresholds in order to evaluate eligibility or to calculate HIPC debt relief as of a historical reference date.35 30 These DSAs have been produced jointly by the World Bank and Fund staffs. Liberia's fiscal year runs from July 1-June 30. 31 Liberia has not yet been rated under the World Bank's Country Policy and Institutional Assessment (CPIA). However, for the purposes of this analysis, the staff's have conservatively assumed a weak policy rating (without prejudicing any future CPIA assessment). Accordingly, the corresponding indicative thresholds for the external LIC DSA are 30 percent for the NPV of debt-to-GDP ratio, 100 percent for the NPV of debt-to-exports ratio, and 15 percent for the debt service-to- exports ratio. See "Operational Framework for Debt Sustainability Assessments in Low-Income Countries--Further Considerations" (http://www.imf.org/External/np/pp/eng/2005/032805.htm and IDA/R2005-0056, 3/28/05) and "Applying the Debt Sustainability Framework for Low-Income Countries Post Debt Relief", (SM/06/364 and IDA/SecM2006-0564, 8/11/06). Assuming a more favorable CPIA rating of "medium" would not change the substance of the external LIC DSA analysis. 32 Liberia's debt to the IMF under the 3-year PRGF/EFF will not be covered by MDRI since it will be contracted after the end-2004 MDRI cutoff date. "Beyond-HIPC" debt relief refers to the assistance necessary to reduce the value of the stock of qualifying debt to zero. 33 See "Debt Sustainability in Low-Income Countries: Proposal for an Operational Framework and Policy Implications" (http://www.imf.org/external/np/pdr/sustain/2004/020304.htm and IDA/SECM2004/0035, 2/3/04) and "Debt Sustainability in Low-Income Countries: Further Considerations on an Operational Framework, Policy Implications" (http://www.imf.org/external/np/pdr/sustain/2004/091004.htm and IDA/SECM2004/0629, 9/10/04) and "Applying the Debt Sustainability Framework for Low-Income Countries Post Debt Relief", (SM/06/364 and IDA/SecM2006-0564, 8/11/06). 34 On the historical averages for the stress tests, average GDP growth is calculated using data from 1961-1980 which excludes significant volatility during the last 25 years due to political instability; the historical averages for some of the other key variables are taken over different subsets of the last 10 years due to the poor quality of data. Also, as noted in "Liberia: Enhanced Initiative for Heavily Indebted Poor Countries ­ Preliminary Document", Annex II (Country Report No. 08/53), service exports for Liberia were estimated using data from comparator countries, as was done for the HIPC DRA. 35 In addition, the results of the LIC DSA differ from the HIPC DRA because of two other methodological differences related to the definition of: (i) discount rates; and (ii) exchange rates. 85 B. Baseline Scenario 2. The baseline scenario relies on the same long-run macroeconomic framework as that underlying the HIPC DRA and is consistent with the program projections under the PRGF/EFF arrangements. Average annual real GDP growth is projected to moderate over the projection period, from 10.5 percent in 2007/08­2012/13 to the long-run average of 3¾ percent in 2013/14­2026/27. This pattern reflects the projected decrease in foreign direct investment (FDI)-to-GDP ratio from short- to medium-term exceptional levels above 30 percent, to a still significant, yet markedly lower, long- term level of about 7 percent.36 While direct donor-financed reconstruction and investment is expected to remain an important factor supporting growth over the medium term, it is expected to decline gradually over the long term as a share of GDP. The ratios of key macroeconomic variables (for example, government revenues, current account deficit and FDI) to GDP may be overstated due to the probable underestimation of GDP owing to the absence of official national accounts data following the destruction of Liberia's statistical capacity during the civil war. 3. Liberia is assumed to exercise continued fiscal discipline resulting in limited borrowing over the medium to long term. It is assumed that the government will continue with the cash-based balanced budget until reaching completion point. The projection then assumes borrowing in 2010/11 to fund fiscal deficits (including grants) of 1.5 percent of GDP in the initial year, and 3 percent of GDP per year for the rest of the projection period. Two thirds of the deficit in each year is assumed to be financed by concessional external debt and the remainder by local currency domestic debt. Underlying this, revenues are assumed to increase gradually from 24 percent of GDP in 2007/08 to their long-term level of 27½ percent of GDP (28.6 percent of GDP, including grants) in 2012/13. Expenditures, excluding debt servicing due which is financed by HIPC assistance, are expected to peak at their long- run level of 31.6 percent of GDP in 2012/13. 4. Under the assumption that FDI and donor flows continue to be robust over the medium term, the external position is projected to remain manageable. Over the longer term, the current account deficit (excluding grants) is projected to decrease gradually as a percentage of GDP from about 69 percent in 2006/07 to around 23 percent in 2026/27. External grants and FDI are expected to remain the predominant form of financing, but decreasing as a percentage of GDP from 42 percent in 2006/07 to around 19 percent in 2026/27. As official transfers and FDI taper off as a percent of GDP, the current account deficit (including grants) is expected to decline gradually to just below 11 percent of GDP by the end of the projection period, matching the gradual fall in the trade deficit as a percentage of GDP as the impact of continuous FDI is fully reflected in export growth. Income growth and improved financial intermediation are expected to stimulate private sector savings and result in a narrowing of the private sector savings-investment deficit in the long term. 5. The baseline scenario assumes full delivery of traditional debt relief, multilateral arrears clearance and interim HIPC assistance.37 In addition, a financing gap is assumed to be met through 36FDI-related imports are assumed to represent about 85 percent of FDI over the projection period. 37The stock of external debt at end- 2007/08 reflects large up-front borrowing from the IMF to clear arrears to the IMF, as well as other reschedulings, and fully grant-financed clearance of World Bank and African Development Bank arrears. 86 additional voluntary interim-period assistance beyond-HIPC Initiative relief, as detailed in the decision point document. Consistent with LIC DSA guidelines, the baseline does not reflect the delivery of HIPC, MDRI and IMF beyond-HIPC assistance at the completion point; however, this is presented in an alternative scenario.38 C. Debt Sustainability Analyses External Debt Sustainability 6. The baseline scenario, which assumes full delivery of traditional debt relief and a financing gap to be met, in part, through HIPC interim assistance, indicates that Liberia is in debt distress (Table 1a, Figure 1). The NPV of external debt-to-GDP ratio remains well above the threshold (30 percent), while the NPV of external debt-to-exports ratio moves below the 100 percent threshold by 2016/17, reflecting the cumulative effect of FDI on exports. The debt service ratios (to export and revenue) become manageable after 2018/19 reflecting the high degree of concessionality of the outstanding stock of debt owed to multilateral (mainly on IDA or IDA-like terms) and bilateral creditors. However, Liberia's debt service ratios are above their respective thresholds (15 percent for exports and 25 percent for revenues) during 2011/12 to 2017/18, due mainly to payments associated with the PRGF/EFF arrangements. 7. The alternative scenarios and bound tests indicate that the evolution of Liberia's external debt position is subject to considerable vulnerabilities and highlight the importance of debt relief (Table 1b, Figure 1). In particular, most debt indicators deteriorate significantly under the bound tests (temporary shocks). Nevertheless, since Liberia's new borrowing is assumed to be moderate and largely on highly concessional terms, a permanent (unfavorable) shock to the terms of new borrowing will not result in a drastic deterioration of debt indicators. However, given Liberia's development needs, any deterioration in the debt ratios will make meeting its spending priorities substantially more difficult. 8. Debt relief through HIPC Initiative, MDRI and IMF beyond-HIPC assistance and possible bilateral and multilateral beyond-HIPC interim-period assistance, would significantly improve Liberia's debt situation. Assuming the full delivery of such assistance at completion point, all three debt-burden indicators (NPV of debt-to-GDP ratio, NPV of debt-to-exports ratio, and debt service-to- exports ratio) would be significantly below their indicative thresholds. Public Sector Debt Sustainability 9. Under the baseline scenario, Liberia's public debt (including domestic debt) is expected to decline steadily as a percentage of GDP throughout the projection period (Table 2a, Figure 2). In the first few years of the projection, the steady fall in the debt-to-GDP ratio is largely driven by strong GDP growth and assumed moderate borrowing. In the outer years, borrowing remains moderate and GDP growth of 3¾ percent is robust enough to continue contributing to the decline in the ratio. 38 See "Staff Guidance Note on the Application of the Joint Bank-Fund Debt Sustainability Framework for Low-Income Countries" (www.imf.org and IDA/SECM2007/0226, 03/05/2007). 87 10. Domestic debt does not play a significant role in public debt dynamics. While the stock of domestic debt at the beginning of the projection period is substantial at around 40 percent of GDP, it has been restructured on concessional terms consistent with the government's domestic debt strategy, and new domestic borrowing, assumed to commence after the completion point, averages 1 percent of GDP.39 11. The various stress tests indicate that Liberia's public debt dynamic is most vulnerable to GDP shocks (Table 2b, Figure 2). Although the one-time 30 percent depreciation shock in 2008/09 (bound test B4) has a large adverse impact on debt dynamics, it should be interpreted cautiously, given that currently about 95 percent of government revenues are collected in U.S. dollars.40 The DSA also shows that the inclusion of part of domestic claims which are currently classified as "contestable" following the government's vetting of domestic debt claims (bound test B5) would increase the debt stock in 2008/09, but not affect debt ratios significantly over the long term.41 D. Debt Distress Classification and Conclusion 12. The low-income country debt sustainability analysis reveals that Liberia is in debt distress. Under the baseline scenario, external debt burden indicators remain well above their indicative thresholds. This emphasizes the need for debt relief. Debt relief under the HIPC Initiative, MDRI and beyond-HIPC assistance significantly improve Liberia's external debt situation and bring Liberia's debt indicators to a manageable level. 13. Alternative scenarios and bound tests indicate that the evolution of Liberia's external debt position is subject to vulnerabilities. The achievement of a robust external debt position will depend on real GDP growth, export and revenue performance as well as prudent debt management. The inclusion of domestic debt in the analysis does not significantly change the overall assessment of Liberia's debt sustainability. 39Debt owed to the Central Bank of Liberia represents over 90 percent of the total domestic debt at end-June 2007 and was rescheduled on concessional terms with a 30 year maturity, 10 year grace period on principal, and interest rates increasing from 1.0 percent at the start of the repayment period to 2.5 percent for the latter part of the period. 40If Liberia were to start collecting a greater portion of revenues in Liberian dollars, resulting in a greater mismatch on the government's balance sheet, the implications of this scenario would become more important. 41The outcome of the further vetting of approximately $0.3 billion of "contestable" domestic claims is uncertain due to the need to establish the validity of claims and the discount factor, as well as potential legal action on the part of claimants. Without prejudging the results of the vetting exercise, the scenario assumes that the discounted value of claims will be 10 percent of GDP (approximately $80 million). 88 Annex 15: CAS Consultations A consultation mission with stakeholders at the government and community levels was carried out in June 2008 to discuss and validate the joint strategic directions and markers for success of the Bank and AfDB. This mission was built on the government's comprehensive consultations held in 2007/08 in 15 counties in Liberia as a part of the development and validation process for the Poverty Reduction Strategy. The team met with and presented the proposed program covering the period of the PRS to key government officials, donors and partners, and civil society (local and international NGOs). The main purpose of the consultations was to receive feedback from the different stakeholders on whether the proposed programs of the Bank and AfDB are aligned with the priorities of the PRS and to determine if more should be done and by whom. Through this exercise, it was evident that there is harmonization and coordination among the donors and development partners as well as in the NGO community. However, these stakeholders face many challenges and difficulties ahead in the achievement of their respective development goals and objectives in Liberia. For instance, the need for capacity building was emphasized repeatedly by all stakeholders. On the government side, the team met with the Minister of Finance, Minister of Agriculture, Minister of Land, Mines and Energy, Minister of Public Works and the Advisor to the President from the LRDC. The following is a summary of the consultations with the government: · Ministry of Finance: The Minister pointed out that the CAS must signal full alignment with the PRS to the donors. Infrastructure is a high priority of the PRS because Liberia cannot achieve shared growth without this. The Bank should do as much in infrastructure as possible and that the AfDB should link agriculture with roads. However, despite the emphasis on these sectors, there should also be focus on budget support. As the government does better, the Bank and AfDB should increase budget support, retain objectivity while signaling willingness to take risks to the rest of the donor community. The CAS should also have heavy focus on implementation and impact on the ground. And through non-lending activities or TAs, the government will continue to demonstrate leadership in structural policies issues, e.g., DTIS. The role of the PFMU should be reviewed and phased-out in 3 years as the government develops more capacity. · Ministry of Agriculture: The Minister summarized the basic challenges affecting the sector in a post-conflict setting ­ (i) low yield and productivity which are mainly due to the quality of seeds, lack of fertilizers and pest management issues; and (ii) deterioration of capacity in the research institute. Research was decimated as a result of almost 2 decades of war. The market system is weak because of low rural demand and lack of access to markets. The entire system needs improvements and the need for specialists and scientists is urgent. Through the assistance of the Chinese government, FAO and WFP, in 2 years, the production of rice and cassava doubled but it is still below pre-war level. What can be done as a short-term emergency response in the context of the PRS? The Minister enumerated the priorities: a) Soil and Water Management ­ Liberia is blessed with water yet the population still has no access to it. The irrigation system needs to be improved. b) Planting Material ­ This is fundamental. High quality equals high yield. 89 c) Rubber Plantation ­ Even during the war, these plantations continued to operate. However, there has been no replanting during the last 15 ­ 20 years thus, the inventory is old. d) Oil Palm ­ There is tremendous interest for this product. Maybe in 10 years, Liberia will be a big exporter. e) Cocoa ­ There is more interest in cocoa than in coffee. As a result, the US is funding sustainable tree crop program. f) Coffee ­ Tree stock is old and needs to be rebuilt. There is also a need to reinvest in seed. g) Low wages in the Agriculture Sector ­ The earning scale in the sector needs to be improved in order to attract new farmers and old farmers to return to farming. Community-based facilities should be made available for the use of the public. Where are interventions needed? a) Focus on planting materials in food (rice, cassava and vegetables) and cash crops (rubber, oil palm, cocoa and coffee); b) Review storage processing areas; and c) Improve the institution through capacity building. Improve the skills of farmers by providing them with training. · Ministry of Land, Mines and Energy: The Minister indicated that the government is working with Arcelor Mittal on a 200 MW power plant project in Buchanan. There is also a need for transmission line with 20-50 MW of power in the interim of the hydropower interconnection through the WAPP. · Ministry of Public Works and Ministry of Transport: The Minister named the 5 priorities in terms of roads work ­ Monrovia Streets, Cotton Tree, Small Bridges, Monrovia Ganta and Sealing. The team brought up the issue of maintenance and the need for an appropriate, institutional set-up and financing mechanism. The contractor is responsible for the maintenance of the roads. The Minister also expressed that the procurement process of the WB is complicated to which the team responded that these are institutional guidelines which have to be followed. · LRDC: The Advisor to the President indicated that the government is still building the foundation in Liberia. In order to meet the priorities of the PRS, all sectors in the matrix need to have a dialogue as a group to have an understanding of what they want and can achieve realistically given the constraints. The Bank and AfDB have the resources, capacity and reach and therefore the need to leverage is vital. With respect to donors, the team met with major players in Monrovia. Representatives from the following organizations were able to attend the meeting: EC, FAO, IMF, USAID, UNICEF and WFP. With such broad and complex programs, the team expressed to the donors that in order to achieve the goals and objectives of the PRS, there has to be harmonization, collaboration and synergism in the partnerships and therefore constant dialogue and leveraging of resources and skills are necessary. Pooling of funds, more importantly, the MDTF which the Bank is coordinating will bring donors together. The following are the key messages from the donors: · The donors support focusing of efforts because there is so much to do and each donor as a single entity cannot do everything. The group has to work closely together to complement each other, continue the dialogue and remain to be engaged. (USAID) 90 · Use comparative advantage in aligning with the PRS. Align with the other donors and not to duplicate each other. Land issue is emerging and needs a lot of technical work, e.g., how to issue land registry for land ownership. The Bank and AfDB have a lot of experience in this area and can provide TA. The group should also think about Liberia's exit from GMAP and aim at financial management. (IMF) · Those donors who bring in small financing compared with the others can contribute TAs. (FAO) · The Bank should provide some financing in social sectors to build confidence of other donors. The Bank should make sure to work with all sectors. (UNICEF) · The donors should participate in joint program initiatives. (WFP) On the side of civil society, 2 separate consultations were held ­ one with the Management Steering Group (MSG) and one with the local NGOs. 19 organizations were represented during the meeting with the MSG to which the team expressed that they will be consulted annually at the minimum. The following is a summary of concerns and discussions: · What can be done to help farmers increase rice production? What is their incentive? Is there training available for farmers? What about storage for farmers? The team responded to these issues by naming the programs the Bank and AfDB are involved with. To increase rice production, AfDB's NERICA program can help. As for the storage issue, the Bank is already addressing this through the DTIS which looks at the chain. The AIDP is designed mainly for cash crops and responded rapidly with US$3m food crisis funding. Another US$3m food crisis funding for nutrition in vulnerable areas was approved. · Liberia is interested in growing more rubber due to the Firestone phenomenon. Can this success be transferred to rice? · There are no roads in the SE, hence there is no agriculture because farmers cannot mobilize their produce. · The situation in Monrovia with regards to urban squatters is becoming worse. Urban planning is necessary in order not to lose investors. There has to be a shift in aid that from humanitarian to development. If this issue is not addressed, the progress achieved today could be destroyed by an unfortunate humanitarian crisis. · If pillars are not done right, all donors, all of civil society will be out of Liberia. Another meeting was organized in the offices of NARDA, a group which coordinates civil society at the local community level. A total of 22 participants attended representing their respective organizations. After the team explained to the group their roles and the programs in support of the PRS, several questions and clarifications were raised: · It was evident that the development of the Agriculture Sector is a priority to some members of the group. The team was asked to clarify what the Bank will be doing and whether the AfDB's NERICA program is the only program addressing this issue. · NARDA representative asked if there can be a recommendation as to which organization is capable. Another asked how grants are monitored to which the team explained that these are done through monitoring and evaluation systems, mid-term reviews, audits and review of the results matrix. These questions were clear signs of mistrust in government. · Other representatives asked if the team is thinking of health, sanitation and water management to which the team responded by enumerating the projects each is already involved with. 91 · Another NGO asked how they can participate and access grants. The team explained that as local NGOs, they act as service providers to the different sectors they work with. They can participate by providing bids in order to engage in contracts. · Capacity building or in general training for Liberians was brought up. One asked that as expatriates come and go, is there any plan for a sustainable training program. 92 Annex 16: Liberia: Fund Relations Liberia--Relations with the Fund (As of February 28, 2009) I. Membership Status: Joined 03/28/1962; Article XIV II. General Resources Account: SDR Million % Quota Quota 129.2 100.0 Fund holdings of currency 472.0 365.3 Reserve position in Fund 0.0 0.0 III. SDR Department: SDR Million % Allocation Net cumulative allocation 21.0 100.0 Holdings 14.1 67.0 IV. Outstanding Purchases and Loans: SDR Million % Quota PRGF Arrangements 214.3 165.8 Extended Arrangements 342.8 265.3 V. Latest Financial Arrangements: Amount Amount Approval Expiration Approved Drawn Type Date Date (SDR Million) (SDR Million) EFF 03/14/2008 03/13/2011 342.8 342.8 PRGF 03/14/2008 03/13/2011 239.0 214.3 Stand-By 12/07/1984 12/06/1985 42.8 8.5 VI. Projected Payments to the Fund42 (Expectation Basis)43 (SDR million; based on existing use of resources and present holdings of SDRs): Forthcoming 2009 2010 2011 2012 2013 Principal 57.13 134.98 Charges/interest 5.82 7.41 7.41 7.21 5.02 Total 5.82 7.41 7.41 64.34 140.00 Projected Payments to the Fund (Obligation Basis)44 42When a member has overdue financial obligations outstanding for more than three months, the amount of such arrears will be shown in this section. 43This schedule represents all currently scheduled payments to the IMF, including repayment expectations and repayment obligations. The IMF Executive Board can extend repayment expectations (within predetermined limits) upon request by the debtor country if its external payments position is not strong enough to meet the expectations without undue hardship or risk. 44This schedule is not the currently applicable schedule of payments to the IMF. Rather, the schedule presents all payments to the IMF under the illustrative assumption that repayment expectations ­ except for SRF repayment expectations ­ would be extended to their respective obligation dates by the IMF Executive Board upon request of the debtor country. SRF repayments are thus only shown on their current expectation dates, unless already converted to an obligation date by the IMF Executive Board. 93 (SDR million; based on existing use of resources and present holdings of SDRs): Forthcoming 2009 2010 2011 2012 2013 Principal 28.56 77.85 Charges/interest 5.82 7.41 7.41 7.31 6.07 Total 5.82 7.41 7.41 35.88 83.92 VII. Implementation of HIPC Initiative: Enhanced Framework A. Commitment of HIPC assistance Decision point date Mar 2008 Assistance committed by all creditors (US$ million)45 2,845.5 Of which: IMF assistance (US$million) 700.2 (SDR equivalent in millions) 428.1 Completion point date Floating B. Disbursement of IMF assistance (SDR million) Assistance disbursed to the member 15.0 Interim assistance 15.0 Completion point balance -- Additional disbursement of interest income46 -- Total disbursements 15.0 VIII. Implementation of Multilateral Debt Relief Initiative (MDRI): Not applicable 45Assistance committed under the original framework is expressed in net present value (NPV) terms at the completion point, and assistance committed under the enhanced framework is expressed in NPV terms at the decision point. Hence these two amounts can not be added. 46Under the enhanced framework, an additional disbursement is made at the completion point corresponding to interest income earned on the amount committed at the decision point but not disbursed during the interim period. 94 IX. Safeguards Assessment An update safeguards assessment of the Central Bank of Liberia (CBL) was completed in August 2008. The update found that while the CBL had largely addressed the measures to increase transparency recommended by the 2007 interim safeguards assessment, significant risks exist in the control framework of the bank. Of particular concern during the course of the assessment was a delay in the assumption of co­signing authority for CBL financial matters by the Fund-supported Special Advisor. The assessment also found that internal audit capacity was weak and that the Audit Committee was not exercising effective oversight of CBL financial reporting, audit, and control systems. A priority measure to utilize the services of an external auditor to conduct a series of special audits was completed in August 2008 and it indicated that the monetary data submitted by the CBL are accurate and in compliance with TMU definitions, and that progress has been made to improve some aspects of the overall control environment, including the assumption of co­signing authority by the Special Advisor. The CBL has also made progress in implementing other safeguards recommendations, including drafting investment guidelines for CBL financial resources. X. Exchange Rate Arrangement Liberia maintains an exchange rate system that is free of restrictions on payments for current and capital transfers. The currency of Liberia is the Liberian dollar. The U.S. dollar is also legal tender. The current exchange rate arrangement is a managed float, with no predetermined path for the exchange rate. The exchange rate of the Liberian dollar is market determined, and all foreign exchange dealers, including banks, are permitted to buy and sell currencies. Liberia's exchange rate at end-January 2009 was L$64.5=US$1. XI. Article IV Consultation The 2008 Article IV consultation discussions were held in Monrovia during October 20-31, 2008 in Monrovia. The staff report (Country Report No. 09/4, 1/13/09) was discussed by the Executive Board on December 22, 2008 and is posted on the IMF website. XII. Technical Assistance Subject Department Date Mission: assessment of TA needs MFD Dec. 2003 Mission: monetary operations, foreign MFD May 2004 exchange, auctions, banking supervision, payments system Mission: monetary operations, foreign MFD Aug. 2004 exchange auctions, banking supervision, payments system Mission: monetary operations, foreign MFD Feb. 2005 exchange auctions, payments system Mission: bank restructuring MFD May 2005 Mission: monetary operations, foreign MFD Aug. 2005 exchange auctions, banking supervision, payments system Mission: negotiation on chief administrator post MFD Dec. 2005 95 Chief Administrator for the CBL MFD long-term Feb. 2006 Mission: bank restructuring, monetary operations, payment systems, and central bank accounting MFD June 2006 Advisor: foreign exchange auction MCM Aug. 2006 Mission: bank restructuring MCM Aug. 2006 Mission: bank restructuring MCM Oct. 2006 Mission: bank restructuring, monetary operations, payment systems, and central bank accounting MCM Feb. 2007 Mission: bank restructuring MCM Mar. 2007 Mission: central bank accounting, and national payments system MCM April 2007 Mission: bank restructuring MCM Apr./Jun. 2007 Advisor: central bank accounting MCM Jul. 2007 Resident expert: bank supervision MCM Aug. 2007 Resident expert: payments system MCM Sept. 2007 Mission: central bank accounting MCM Oct. 2007 Mission: central bank accounting MCM Mar./Jun. 2008 Mission: bank supervision MCM Sep./Oct. 2008 Mission: central bank accounting MCM Jan. 2009 Mission: assessment of TA needs FAD Dec. 2003 Mission : public expenditure management FAD May 2004 Mission : public expenditure management FAD July 2004 Mission : tax administration FAD Sep. 2004 Mission : public expenditure management FAD Dec. 2004 Mission : public expenditure management FAD Feb. 2005 Mission : forestry tax policy FAD Feb. 2005 Mission : public expenditure management FAD May 2005 Mission : public expenditure management FAD Dec. 2005 Mission : public expenditure management FAD Feb. 2006 Mission: public financial management FAD Mar. 2006 Mission: tax policy FAD May 2006 Mission: revenue administration FAD Aug. 2006 Advisor: tax administration FAD short-term Oct. 2006 Advisor: public financial management FAD long-term Nov. 2006 (resigned in Feb. 2007) Mission: tax administration FAD Feb./Mar. 2007 Mission: tax policy FAD Apr. 2007 Advisor: public financial management FAD long-term May. 2007 Mission: customs administration FAD Jun./Jul./Oct. 2007 Mission: tax administration LEG Jun./Sept./Oct. 2007 Mission: extractive industries tax FAD Aug./Sept. 2007 Mission: PFM FAD Oct./Nov./Dec. 2007 Mission: tax policy for mining FAD Dec. 2007 Mission: customs administration FAD Jan. 2008 Mission: revenue administration/tax administration FAD Apr. 2008 96 Mission: review of revenue administration reforms and technical assistance needs FAD Feb. 2009 Mission: PFM--drafting regulations FAD Feb./Mar. 2009 Mission: fiscal decentralization FAD Feb./Mar. 2009 Mission: assessment of TA needs STA Dec. 2003 Mission: balance of payments statistics STA May 2004 Mission: balance of payments statistics STA July 2004 Mission: government finance statistics STA July 2004 Mission: national accounts STA July 2004 Mission: monetary and financial statistics STA Aug. 2004 Mission: government finance statistics STA Jan. 2006 Mission: consumer price statistics STA May 2006 Mission: government finance statistics STA June 2006 Mission: monetary statistics STA Nov. 2006 Mission: balance of payments statistics STA Nov. 2006 Mission: CPI STA Jun. 2007 Mission: monetary statistics STA Oct./Nov. 2007 Resident expert: balance of payments STA Jan. 2008 Mission: revenue code LEG Oct. 2006 Mission: tax legislation LEG Jul./Oct. 2007 Mission: tax policy for mining LEG Dec. 2007 XIII. Resident Representative A resident representative has been posted in Monrovia since April 2, 2006. 97 Annex 17: Donor Coordination in Liberia Sector/Thematic Areas M&E) (incl. Funding Dev. Reform Rural Building & Annual Legal Stability Sector Sanitation Sector & & & Protection Sector Partner Approx. (US$M) Private Financial Infrastructure/Transport Trade Agriculture Health Education Environment Water Social Public Judicial Capacity/Inst. Security Gender European Community 14 X X X X X X X AfDB 0.65 X XX X X France 2 X Japan X United Kingdom/DFI D 20 X XX X United Nations 150 X XX X X X X XX X XX XX United States 100 X X X XX X X X XX x XX IFC XX XX X X X World Bank 40 XX X XX X X X X XX X X Denmark X X Germany X X X X X X X China X X X X X Sweden 10 X X X X X X Note XX-Lead donor 98 Annex 18: Country Map 99 IBRD 33435R2 11°W 10°W 9°W 8°W 9°N 9°N G U I N E A LIBERIA S I E R R A To L E O N E Irié To Voinjama oinjama Buedu Kolahun Kolahun To Mt. Wuteve Mt. uteve L O FA Pendembu (1,380 m) (1,380 m) Mts. 8°N Vahun ahun 8°N To Kenema Gelahun Gelahun To Lola Gbeya Wologizi Range Wonogizi Zorzor Zorzor Loffa Via Nianda Yekepa Yekepa kepa Mts. To Nzérékoré Nimba Kongo G B A R P O L U GbalatuahGbalatuah SenniquellieSenniquellie To To Ganta Ganta KarnplayKarnplay Danané Zimmi GRANDGRAND BopoluBopolu Bo Bo 7°N CAPECAPE GbarngaGbarnga St. Paul PalalaPalala 7°N MOUNTMOUNT Zeansue ZienzuZienzu Tubmanburg ubmanburg B O N G Sagleipie Sagleipie Yopie opie Bong Town Bong own Totota otota Robertsport N I M B A B O M I C Ô T E Klay Klay M A R G I B I BotataBotata Gloie Gloie Nuon D ' I V O I R E Careysburg Careysburg To KakataKakata Tappita Tapeta apeta Toulépleu St. John BensonvilleBensonville Tobli obli MONROVIA G R A N D Harbel Harbel GuataGuata Kola Town Kola own MONTSERRADO B A S S A Poabli Poabli Hartford Hartford Gaamodebi Gaamodebi ZwedruZwedru 6°N RIVER CESS RIVER CESS Babu Babu 6°N G R A N D G E D E H Buchanan Trade rade Town own Gonglee Gonglee Dube Pyne Pyne Cestos Bokoa Bokoa Cestos City S I N O E Pelokehn Pelokehn ATLANTIC OCEAN Kopo Kopo Juazohn Juazohn R I V E R G E E Sehnkwehn Kanweaken KahnwiaKahnwia Fish Town Fish own Tawake awake Tawlokehn awlokehn 5°N Greenville 5°N G R A N D Nana Kru K R U BarclayvilleBarclayville Sasstown LIBERIA M ARYLAND Nyaake Nyaake Grand Cess Plibo Plibo To Tabou SELECTED CITIES AND TOWNS Harper COUNTY CAPITALS NATIONAL CAPITAL 4°N RIVERS MAIN ROADS This map was produced by the Map Design Unit of The World Bank. 0 20 40 60 80 100 Kilometers RAILROADS The boundaries, colors, denominations and any other information shown on this map do not imply, on the part of The World Bank Group, any judgment on the legal status of any territory, or any COUNTY BOUNDARIES endorsement or acceptance of such boundaries. 0 20 40 60 Miles INTERNATIONAL BOUNDARIES 10°W 9°W 8°W JULY 2007