International Bank for Reconstruction and Development MONTHLY OPERATIONAL SUMMARY OF BANK AND IDA PROPOSED PROJECTS (As of October 31, 1981) SecM81-903 FROM: Vice President and Secretary November 11, 1981 CONTENTS Section I. Eastern Africa 1 - 14 u. Western Africa 15 - 29 Ill. East Asia and Pacific 30 - 40 IV. South Asia 41 - 49 v. Europe, Middle East and North Africa 50 - 62 VI. Latin America and Caribbean 63 - 77 VII. New Projects 78 - 79 Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1_/ Lender 2/ Procurement!!._/ ---- I. EASTERN AFRICA BOTSWANA (BOTSWANA About (R) Power I (Coal) - Construction of Appraisal report under POWER 35.0 90 MW Pithead power station at preparation. (Cofinancing CORPORATION) (Bank) Morupule, and transmission lines. being sought.) Project cost estimated at·$262 million, with foreign exchange component of about $204 million. Ministry of 20.0 (R) Education III - Construction, furnish- Board presentation on November 10. Education (Bank) ing of primary school classrooms; textbooks; construction of new primary teacher training college. Total project cost about $30.0 million. (WATER UTILITIES About Water Supply III - Surface or Project identification CORPORATION) 7 .o groundwater development to meet under way. (Bank) Gaberone's future water supply requirements. Total project cost to be determined. BURUNDI Ministry of 19.3 Kirimiro Rural Development - Inte- Approved by the Agriculture (IDA) grated rural development (food, crops, Executive Directors and Livestock coffee, rural services) in about on June 16. 6 communes in the Kirimiro region; extension services to increase pro- duction of cash crops and foodcrops; provision of agricultural inputs; improvement of marketing and social infrastructure. Total project cost estimated at $21.4 million. If the Government is the borrower, the name of the department, ministry or agency which is to implement the project is given. If the Government is to relend the proceeds to another entity, the name of that entity is given. If the Government is not the borrower, the borrower's name is given in capital letters in parentheses. 2/ The amount is in millions of U.S. dollars and is approximate and tentative. }_! The letter (N) before the project means that the project is a new listing in the Summary; the letter (R) means that the information about the project has been revised since the last issue of the Summary. Section VII of the Summary contains a recapitulation of the new projects listed in this issue. This column contains available information, if any, about a~tion with respect to the procurement of goods and services expected to be financed by the Bank or IDA. Distribution: Executive Directors and Alternate~ President Senior Vice Presidents President's Council Vice Presidents, IFC Directors and Department Heads, Bank and IFC - 2 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender 'le_/ Procurement'!_/ BURUNDI (Cont'd) Ministry of 16.0 (R) Integrated Rural Development II/Ngozi Board presentation Agriculture (IDA) III - Continuation of coffee improve- scheduled for December. (Co- ment program and development of financing arrangements with foodcrops in context of an integrated IFAD and Kuwait Fund agreed.) rural development of the Ngozi-Muyinga An advance of $500,000 from the region. Total project cost estimated IDA Project Preparation Facility at $28.9 million. has been approved for the establishment of the project implementation agency, including technical assistance for extension services. Ministry 25.0 Highway III - Construction of first Approved by the Executive Directors of Public (IDA) section of Ngozi-Kobero road (about on April ,21. IDA Project Preparation Works and 39 km) and continuation of road main- Facility advance of $1,000,000 Equipment tenance. Total project cost for first approved to Complete preparation section estimated at $32.1 million. of project. (Co-financing agreed with Belgium, France, Japan, UNDP and AGCO.) Ministry of About (R) Local Construction Industry - Negotiations tentatively Energy and 5.0 Promotion of local construction scheduled for mid-December. Mines (IDA) industry. Total project cost An advance of $300,000 from estimated at $7.1 million. the IDA Project Preparation Facility has been appro~ed for the establishment and start up of operaUons of the project unit, including the recruitment of consultants. Ministry of About Water Supply II - Rehabilitation Project preparation underway. Rural 15.0 of 48 rural aqueducts. Total project IDA Project Preparation Facility Development (IDA) cost to be determined. advance of $470,000 approved to complete preparation. Regie de produc- About (R) Rwegura Hydro.electric Power - Con- Project justification being tion et distri- 27.0 struction of a hydroelectric plant. reviewed. bution d'eau et (IDA) d'electricite (REGIDESO) Ministry of To be Education I.II - Expansion of basic Proje~t to be i~entified. National deter- 1 education., Total project cost to ~~ucation mined be determined. (IDA) Ministry of About Technical Assistance - Improving Project under preparation. Planning 6.0 efficiency of public sector enter- Appraisal mission scheduled (IDA) prises ~nd project preparation for April 1982. capabiliti.es. Total project cost to be determined. Banque About (R) DFC II (Artisan Centers) - Second Appraisal mission in the field. Nationale de 8.0 line of credit to BNDE. Total Dev:eloppement (IDA) .project cost to be determined. Economique (BNDE) Ministry About Agriculture Muyinga - Pilot Project under preparation. of Agriculture 20.0 settlement scheme and development (IDA) of coffee and foodcrop production in the Muyinga province. Total project cost to be determined. COMOROS Ministry of 6.0 (R) Education - Primary education curric- Negotiations substantially com- Education (IDA) ulum improvement including provision pleted. IDA Project Preparation of textbooks; training of teacher9, Facility advance of.$205,000 approved health personnel and agricultural I to finance project preparation · staff. Project based on UNESCO activities·. study. Total project cost estimated at $6.5 million. See page 1 for footnotes. - 3 - Membe_r Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency lf Lender 'l:._/ Procurement!:_/ COMOROS (Cont'd) Ministry of 6.3 (R) Highways II - Continuatfon for 3 years Board prese'ntation on November Equipment and (IDA) of road maintenance and ;improvement 10. (Co-financing with Environment program started under fi'rst highway AfDB agreed.) project. Total project lcost estimated at $13.5 million. i Ministry of About (R) DFC I - Line of credit f.or financing Project under preparation. Finance and 3.0 of industry, agroindustr,y and small- Plan (IDA) scale industry. i I DJIBOUTI Ministry of About I Technical Assistance - T,echnical Appraisal mission preparing Finance and 3.0 assistance in planning, and project 1 its report. (Project to be Economy (IDA) preparation and evalua ti;on. co-financed with UNDP;. Bank is executing agency I for UNDP-financed part of project.)- Ministry of About (R) Road Maintenance - Strenlthening of Appraisal mission scheduled Public Works 6.0 the road maintenance cap'.ability for November. (Co-financing (IDA) of Minis try of Public Woirks. being explored with the Arab Fund.) I Ministry of About Urban Sites - Services ahd Housing Project under preparation. Public Works/ 8.0 Development - Urban facilities, An IDA Project Preparation District of (IDA) support for small scale industry, Facility advance of $500,000 Djibouti and artisanal enterprise!, training. has been approved to finance I primarily consultants' servi~es. ETHIOPIA Addis Ababa Water & Sewer- To be deter- "'" "'"'' ,,,., ,.,,,,! n - ,.,,,., expansion of the water supply system Project preparation underway. age Authority mined of Addis Ababa. I (AAWSA) (IDA) I Ministry of To be ' Marketing - Livestock Development anr Preparation report to be Agriculture deter- A sector credit for furtper livestock revised on completion of mined development. Government's comprehensive (IDA) I review of livestock sector. Ministry of To be (R) Urban Development I - Upkrading of Appraisal report being Public Works deter- existing settlements in Addis Ababa prepared. & Housing mined with basic services and house improve- (IDA) ment loans and developmeht of new sites for self-help housing co~struction. Ethiopian To be I . . Power III - E1 ectr i c transmission an d Preparation work Electric Light deter- possibly hydroelectric g~neration underway by EELPA, and Power mined facilities. I to be assisted by Authority (IDA) Consultants. (EELPA) I I AIDB To be DFC IV - Provision of cr~dit and tech- Appraisal report under review. deter-:- nical assistance to small-scale enter- mined prises, and assistance tb the agri- (IDA) cultural and industrial ~ector, through the Agricultural and Ind~strial Devel- opment Bank for medium- fo large-scale enterprises. I I Ethiopian To be Roads VIII - Second phase of Preparation underway in Transport deter- 1978/82 Road Sector Program. course of supervision of Construction mined Roads VII. (IDA) I Ministry of To be Coffee Processing lI and!Marketing - Appraisal report under Coffee and Tea deter- Second phase of the ongotng coffee preparation. Development mined processing project. (IDA) See page 1 for footnotes. - 4 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action· on Agency lf Lender 2/ ---- Procurement 4/ ETHIOPIA (Cont'd) Ethiopia To be Sugar - Establishment of new sugar Project preparation underway. Sugar deter- production complex at Finchaa, (Co-financing is being Corporation mined including infrastructure, sought.) (IDA) Ministry To be Agricultural Minimum Package Project Preparation work of deter- III - Support for expansion and underway. Agriculture mined intensification of integrated agri- (IDA) cultural services, including con- struction of rural roads, seed multiplication programs; provision of training facilities, KENYA Ministries of 25,0 Industry I - Soda Ash Project, Expan- Project preparation underway. Commerce and (Bank) sion of soda ash production and Industry/Kenya improved railway and port facilities. Port Authority Ministry of 40.0 (R) Population II - Support for family Negotiations tentatively scheduled Health (IDA) planning and rural integrated health for January, (Co-financing being programs. Estimated total project arranged.) cost $70,0 million. Ministry of 25,0 Agricultural Credit IV - Institutional Approved by the Executive Agriculture (Bank) strengthening in areas of planning, Directors on May 19, and Agricul- 10.0 credit management and training; and tural Finance (IDA) line of credit to Agricultural Corporation Finance Corporation, Estimated total project cost $50,0 million. Ministry of Up to (R) Cotton Processing and Marketing Negotiations scheduled for Agriculture 30.0 Marketing, storage and processing early December. (IDA) of cotton, Total cost estimated at $45.l million, Ministries of 35.0 Industry II - Leather Production Project being reassessed, Commerce and (Bank) Project. Processing of hides and Industry production of leather goods. Ministry of 20.0 Urban Transport - Improvement of Further project processing Urban Develop- (Bank) public transport and pedestrian delayed pending the resolution ment and Housing 15,0 facilities, road maintenance, and of counterpart financing (IDA) strengthening of transport manage- issues. ment in Nairobi and Mombasa, Total project cost estimated at $48,3 million, Ministry of 15 .0 (R) Urban (Small Towns) - Extension Preappraisal mission scheduled Urban Develop- (Bank) of urban development programs for November. ment and Housing 24,0 to smaller towns, (IDA) (INDUSTRIAL 45.0 Fifth line of credit to IDB, Project under preparation. DEVELOPMENT (Bank) BANK) Ministry 35,0 (R) Forestry III - Maintenance and Negotiations tentatively of Environ- (Bank) rehabilitation of existing planta- scheduled for December. (Co- ment and 16.0 tions, new industrial plantations, financing being explored,) Natural (IDA) fuelwood plantations, development Resources of sawmilling industry, and various studies. Total project cost esti- mated at $79 million, See page l for footnotes, - 5 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency I_/ Lender'!:._/ Procurement'!_/ KENYA (Cont'd) Ministry 4.0 (R) Petroleum Exploration Promotion: Negotiations substantially of Energy (Bank) Would provide technical assistance completed. in petroleum exploration and for legal consultants. Total project An IDA Project Preparation Facility cost estimated at $5.3 million. advance of $300,000 has been approved to finance geological/geophysical review of existing exploration data, and legal studies. A second advance of $700,000 has also been approved to complete the work. Ministry of 41.0 Grain Marketing and Storage - Project preparation underway. Agriculture (IDA) Components to be identified. (TANA RIVER 50.0 Power IV (Kiambere) Civil work Project preparation underway. DEVELOPMENT (Bank) including powerhouse with two 70 (Co-financing being explored.) COMPANY) MW units and associated mechanical and electrical equipment. Total project cost estimated at about $300 million. Ministry To be Second Structural Adjustment Appraisal report being prepared. of Finance/ deter- Credit - Support for program Ministry of mined of economic measures agreed with Economics, (Bank/ the Government. Planning IDA) & Develop- ment Ministry 15.0 Cotton ProductiO!l ---: C~mponents Preparation·dependent of Agri- (IDA) still to be identified. on progress of Cotton culture Processing/Marketing Project. Ministry 6.0 (R) · Agriculture Technical Assistance: Appraisal report being of Agriculture (IDA) Technical assistance to the prepared. agricultural sector to support structural adjustment program. Kenya Post and 37 .o. (R) Telecommunications II - Telecommuni- Appraisal mission Telecommunica- (Bank) cations Development. Total project scheduled for mid-November. tions Corporation cost estimated at $124.7 million. LESOTHO Ministries of About (R) Highways IV - Continuation of road Project preparation Works, and 12.0 maintenance and rehabilitation underway. (Co-financing Transport and (IDA) begun under Third Road Project. expected to be needed.) Communications .possible assistance for construction of Oxbow-Mokhotlong road. Total project cost estimated at $28 million. Lesotho About DFC III - Third line of Credit to Project to be defined. National 5.0 Lesotho National Development Corpora- Development (IDA) tion. Corporation Ministry of About Health/Nutrition - Components to be Project under identification. Health and 12.0 identified. Social Welfare (IDA) MADAGASCAR Ministries of About Fokonolona I (Rural Development) - Project under preparation by Rural Develop- 12.0 Hedium and long-term credit to small Government, with assistance ment; Finance (IDA) farmers and artisans·; rural develop- from RMEA. and Planning ment fund to finance village-level infrastructure, such as irrigation systems, feeder roads, collective storage facilities, and village water supply systems; training; and estab- lishment of central project manage- ment unit. See page 1 for footnotes. _ ,,.J - 6 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency];_/ Lender '±_/ Procurement'!_/ MADAGASCAR (Cont'd) Ministry 20.0 (R) Forestry II - Follow-up on Forestry I; Credit signed on October 29, of Rural (IDA) planting of 18,000 ha over a 3-year Development period, Total cost is $30,2 million, Ministry of About (R) Urban I - Upgrading of low income Pre-appraisal mission scheduled Finance and 20.0 neighborhoods in Antananarivo and for January, Plan, Industrial (IDA) Toamasina; employment and income Bank and Munici- generation; serviced sites for new pality of housing in Antananarivo; municipal Antananarivo assistance, Ministry of About Second Village Livestock and Rural Appraisal report being reviewed, Rural Develop- 15.0 Development - Extension of veteri- (Co-financing with IFAD under ment (IDA) nary services to the whole Mahajunga discussion.) Faritany, including development of social and-road infrastructure; pilot component of integrated mixed farming and cattle fattening; and imports of veterinary supplies and provision of technical assistance to the livestock sub-sector, Total pro.ject cost estimated at $25.8 million, Ministries of About (R) Lac Alaotra II - Intensification Post-appraisal mission scheduled Rural Develop- 30.0 of cultivation in Lac Alaotra area for December. (Co-financing ment; Finance (IDA) (mainly rice), Includes seed with BADEA being explored.) and Planning production, marketing, irrigation maintenance, extension, and assistance to SOMALAC, Ministry About Middlewest Mixed Farming - Integrated Project being prepared, of Rural 20,0 mixed farming development. (Co-financing likely to be Development (IDA) required,) Ministry About Highways VI - Highway maintenance. Project being identified, of Public 25,0 (Co-financing likely to be Works (IDA) required,) . 'Office Militaire About (R) Petroleum II - Further development Project being prepared, National pour 35,0 of the petroleum sector, including les Industries (IDA) financing of a feasibility study Strategiques for heavy oil exploitation in (OMNIS) Tsimiroro, Total project cast to be determined. Ministry of About Agricultural Institutions: Tech- Appraisal report being prepared, Rural 5,0 nical Assistance - Parastatal reform, IDA Project Preparation Facility Development (IDA) management studies, planning assistance, advance of $1,000,000 has been and research. approved to complete preparation and start essential assistance to the sec tor, Ministry About Petits Perimetres - Strengthening Project preparation of Rural 15.0 of national systems for operation underway. Development (IDA) and maintenance of efficient irrigation network and rehabilita- tion of selected networks. Bankin' NY About DFC II - Second line of credit to Project preparation underway. Indostria 15.0 Bankin' NY Indostria (BNI), (National (IDA) Industrial Development Bank (BNI)) Ministry of About Cotton - Smallholder cotton Project under preparation, Rural 10,0 development and ginnery Development (IDA) modernization. MALAWI Department of About Water Supply II - Expansion of Project under preparation. Lands, Valuation 26.0 water supply facilities for City and Water; (Bank/ of Lilongwe. Office of IDA) the President and. Cabinet See page 1 for footnotes. - 7 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Jj Lender 'l:_/ Procurement 4/ MALAWI (Cont'd) Ministry of 7.3 (R) National Rural Development Program Approved by the Executive Agriculture (IDA) III - Third consolidation stage of Directors on October f3. and Natural the Karonga/Chitipa Project. Total Resources project cost estimated at $8.6 million. ( INVESTMENT About DFC II - Assistance to the Investment Project preparation underway, AND DEVELOPMENT 5.Q and Development Bank of Halawi; Second BANK OF MALAWI (Bank) Line of Credit. (INDEBANK)) Ministry of About (R) Health - Improve health services, Project preparation Health 21. 7 with particular attention to underway. (IDA) administrative and medical training, and drug distribution. Ministry About Structural Adjustment Loan II. To be defined following of 80.0 utilization of first loan and Finance (IDA) outcome of program. Ministry of About (R) National Rural Development Program Appraisal mission scheduled ·Agriculture 35.0 IV - Expansion of NRDP concept into for January. and Natural (IDA) new developing areas - Dedza Hills Resources and Lilongwe East. Ministry About (R) Education V - Primary teacher Project preparation of Education 35.0 training, Secondary Education, underway, (IDA) accounting and management training. Ministry of About Highways V - Highway mainten~nce, Project preparation underway. Works and 46.0 including workshop equipment Supplies (Bank) and staff training; road construction. MAURITIUS Ministry About (R) .Road Maintenance and Rehabilitation - Project under preparation, of Public 10.Q Total project cost estimated at $15.4 ·(Cofinancing being explored.) Works (Bank) million. Bank Project Preparation Facility advance of $246,000 has been approved to finance engineering and economic studies. Ministry of To be Education III - Post-primary tech- Project identification Education deter- nical schools and vocational underway, and Cultural mined education. Affairs (Bank) Central About (R) Water Supply - Rehabilitation Appraisal mission in the Water 10.Q and expansion of water supply field. (Co-financing: Authority (Bank) systems. Total project cost still Kuwait Fund loan agreed in undetermined. principle; being explored with CCCE; Abu Dhabi also providing funds,) Development About (R) DBM VI - Sixth Line of Credit to Appraisal mission scheduled Bank of 10.Q Development Bank of Mauritius. for November. Mauritius (Bank) (DBM) Irrigation To be Northern Plains Irrigation - Project being prepared. Authority deter- Irrigation infrastructure for (Co-financing with AfDB agreed.) mined about 2,500 ha; provision of (Bank) agricultural services and inputs for·about 1,200 small farmers growing sugar cane and. foodcrops. RWANDA Ministry of About Education II - Project to focus on Appraisal report being prepared. Education 10.0 quality improvement of occupationally- (IDA) oriented secondary education. Total project cost estimated. at $11.8 million. Banque About Local Construction Industry - Assis-- Project to be identified, Rwandaise de 10.0 tance in the promotion of the local Developpement (IDA) construction industry through technical assistance and credits for equipment. Total project cost undetermined. See page 1 for footnotes. - 8 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency l_/ Lender'!:_/ Procurement':_/ RWANDA (Cont'd) Ministry of About (R) Highways V - Construction of the Negotiations tentatively Public Works 18.0 Butare-Ntendezi road (123 km); scheduled for January. (Co- and Equipment (IDA) technical assistance preinvestment financing with EEC agreed.) study, Total project cost estimated at $64.0 million. Ministry of About Water Supply - Rehabilitation, Project being prepared, Public Works 10.0 improvement and extension of rural and Equipment (IDA) aqueducts in the Gisenyi arid IDA Project Pr.eparation Ruherigeri Prefectures; construction Facility advance of $500,000 of sanitation facilities for Kigali; approved to finance consultants' and renovation and extension of water services during one year of supply sys terns in ·a few secondary preparation as well as the urban centers. Total project cost necessary local support staff to be estimated. and equipment. Banque About (R) BRD Ill - Third line of Credit Project to be identified. Rwandaise de 15.0 to the Development Bank of Rw&nda Developpement (IDA) to finance industrial development. (BRD) Total project cost to be determined. Ministry of About (R) Bugesera (Phase II) - Possible com- Post-appraisal mission in the Agriculture 15.0 ponents to include mixed crop. and field. (IDA) livestock farming. Total project cost to be determined pending post- appraisal. Ministry of About (R) Technical Assistance - Provision Negotiations tentatively scheduled Planning 5.0 of technical assistance to for December. (Co-financing with UNDP (IDA) Ministry of Planning, Total agreed.) project cost about $5.2 million. SEYCHELLES Ministry of About (R) Ports/Land.Reclamation·- Reclamation Appraisal ~ission scheduled for Planning 6.0 of land, improvement of fishing and June 1982. Bank Project Preparation (Bank) commercial ports, and development of Facility advance of $300,000 approved industrial site. Total project cost to complete project preparation. (Co~ estimated at $25·.0 million. financing being explored with Kuwait Fund, OPEC Fund, BADEA and AfDB.) SOMALIA Somali To be DFC 11 - Assistance to the Somali Project identification Development deter- Development Bank. underway. Bank mined (IDA) Government To be Roads IV - Strengthening of the Appraisal report being reviewed. of Somalia deter- Algoi-Baidoa road; pilot road main- mined tenance program; training of Somali (IDA) engineers abroad. Mogadishu To be Mogadishu Water Supply - Extension Appraisal report being reviewed. Water deter- of Mogadishu water supply facilities. (Co-financing is being Authority mined sought.). (MWA) (IDA) Procurement: Retroactive financing of up to $100,000 will be recommended to cover the initial cost of consulting services for water resource investigations. Government To be Fisheries - Support for small Project.identification of Somalia deter- fisheries development, including underway. mined financing of infrastructure and (IDA) processing facilities; financial and technical assistance to artisans and fishermen. See page 1 for footnotes. - 9 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency y Lender'!:_/ Procurement!:._/ SUDAN Government To be Urban Water Supply - Expansion.of Preparation underway by of Sudan deter- Water Scheme in Khartoum. Government and consultants. mined (IDA) Agricultural 18.0 Agriculture Services Project - Credit Negotiations substantially completed. Bank of Sudan (IDA) for small farmers and possibly agri- IDA Project Preparation Facility cultural machinery through Agricultural advance of $600,000 approved to Bank of Sudan. finance consultancy services, provision of vehicles, equipment and seed material. Ministry of To be Gezira Rehabilitation - Trials, studies Project preparation underway. Irrigation deter- and possibly some investments aimed and Gezira mined at improving Gezira production. Board (IDA) Government To be Port Development I I - Extension Appraisal report under of Sudan deter- of facilities at Port Sudan. review. IDA Project mined Preparation Facility advance (IDA) of $250,000 approved to finance consulting services for prepara- tion of tender documents. Government To be Sugar Rehabilitation - Credit Project identification of Sudan deter- would provide assistance for underway. mined rehabilitation of sugar industry (IDA) and would support policy changes in the subsector gep.~ral~Y:• Government To be Highways Ill - Construction of Project preparation of Sudan deter- national and/or secondary/feeder underway. mined roads; improvement and maintenance (IDA) of secondary roads; technical assistance to the Southern Region MiniStry of Communications, Transport and Roads (SRMCTR). Government To be (R) Petroleum - Petroleum development Appraisal mission tentatively of Sudan deter- and distribution. scheduled for December. IDA mined Project Preparation Facility (IDA) advance of $100,000 approved to finance consultancy services for distribution study. Government 13.0 (R) Savanah Development Consolidation - Approved by the Executive of Sudan (IDA) A pilot operation which would, over Directors on October 6. 3 years, provide 3 development (Cofinancing with Saudi centers, 4 settlement areas, 400 ha. Fund and ODA agreed.) of flood irrigation, a range program, veterinary services, and rehabilita- tion of water resources facilities. Government To be Railways V - Track rehabilitation, Project preparation under- of Sudan deter- signalling, locomotives and rolling way. mined stock. Maintenance facilities, (IDA) training and communication. Government To be Program Credit - Industrial Program identification of Sudan deter- Rehabilitation. underway. mined (IDA) Government To be (N) Power IV - Expansion of power Project preparation of Sudan deter- gener<..1tion -1nd transmission underway. mined facilities. (IDA) See page l for footnotes. - 10 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency]:_/ Lender 'l:j Procurement !:./ SWAZILAND Ministry of About Low Veldt Development - Irrigation Project identification Agriculture 11,0 for crop production and, potentially, underway, (Bank) for ranch development, (NATIONAL About DFC II - Line of credit for medium- Awaiting utilization of INDUSTRIAL 7 .o . scale industrial enterprises, funds in first loan, DEVELOPMENT (Bank) CORPORATION) Ministry for About Urban I - To be identified, Project identification Water, Power 12,0 underway, and Communi- (Bank) cations Ministry of About (R) Roads IV - Upgrading Ngwavuma River - Negotiations tentatively sche- Works, Power 6,5 Luvumisa road and technical duled for January, and Communi- (Bank) assistance to strengthen road main- cations tenance, and feeder road study, Total project cost estimated at $8, 6 million, TANZANIA Office of Prime 14,0 (R) Rural.Development IV (Mara) - Road .Further processing awaits Govern- Minister (IDA) rehabilitation, water supply improve- ment decisions on public invest- ments, and support services for ment program, IDA Project Prepar- smallholder dairy and coffee ation Facility advance of $228,000 production in Mara Region, Total approved to finance improvements to project cost estimated at $17,5 existing infrastructure and services million with foreign exchange in Mara region, component of $13,4 million, Ministry of 15,0 {R) Water Supply II - Urban Water Supply Project require;' re-appraisal owing Water, Energy (IDA) for Iringa and Moshi, Total project to major increase in projected and Miner al s cost estimated at $22,8 million, with water requirements, IDA Project foreign exchange component of about Preparation Facility advance of $17 ,0 million, $700,000 approved to finance engineering· consultant costs to prepare preliminary and detailed design for the expansion of the water system in two towns (Iringa and Moshi), Ministry of 21.0 Harbours I - Improvements to Dar-es- Appraisal mission scheduled for Communications (IDA) Salaam Port, Total project cost November, {Co-financing possibilities and Transport estimated at $75,0 million, with being explored,) foreign exchange component of about $50,0 million, (NATIONAL BANK 10,0 Small Scale Industries Project - Project being reviewed in light OF COMMERCE (IDA) To provide a line of credit to of Government's overall investment (NBC)) NBC for onlending to small-scale priorities. industry and to assist in the development of institutional IDA Project Preparation Facility capabilities. advance of $500,000 approved to finance consultant costs to prepare detailed projections, help NBC in organizing and establishing a special department, help Ministry of Industry to review overall development plans, and assist the Bank of Tanzania to set up a credit guarantee fund and to finance training, Ministry of 27.0 Telecommunications I - A three- Approved by the Executive Directors Communications (IDA) year program of expansion and on July 21, and Transport rehabilitation of telecommunica- tion facilities, Total project ~ost estimated at $47.0 million, with a foreign exchange component of $27,0 million, See page l for footnotes, - 11 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}) Lender ?:_/ Procurement '!_/ TANZANIA (Cont'd) (TANGANYIKA 10.0 TDFL II - Second line of credit Negotiations postponed, pending DEVELOPMENT , (IDA) to TDFL. Government's review of invest- FINANCE CO., ment priorities. LTD,) . (TDFL) Ministry of 15.0 Dar-es-Salaam Sewerage - Rehabili- Appraisal report being prepared. Land, Housing, (IDA) tation of Dar-es-Salaam sewerage IDA Project Preparation Facility and Urban system. Total project cost esti- advance of $1.0 million approved to Development mated at $27.2 million, with a finance consultants for completion of foreign exchange component of preparatory work, feasibility $11. 2 million. studies and detailed design. (TANZANIA 15.0 TIB V - Fifth line of credit to TIB. Appraisal report being prepared. INVESTMENT (IDA) BANK) (TIB) (TANZANIA 20.0 (R) Petroleum II - This project will be Combined Appraisal/President's PETROLEUM (IDA) the second phase of Songo-Songo Report being reviewed. (Co- DEVELOPMENT Petroleum Exploration Project. Total financing being explored with CORPORATION) project cost estimated at $45.0 European Investment Bank and OPEC million with a foreign exchange Special Fund • ) component of $40 million. Ministry 12.0 (R) Forestry II - Second phase of the Appraisal report being reviewed. of Natural (IDA) Sao Hill Forestry Project. Total Resources project cost estimated at $15.0 and million, with foreign exchange Tourism component of about $6.2 million. Ministry 10.0 (R) Technical Assistance III - Assis- Combined Appraisal/President's of Finance (IDA) tance to Government in implementing Report being prepared. An IDA the Export Rehabilitation Program Project Preparation Facility and in preparing more·wide-ranging advance of $200,000 was approved economic adjustment measures. Total to help finance technical personnel project cost estimated at $15.0. and training in key areas, as well million, with a foreign exchange as an Advisory Group to assist component of $12.0 million. the Government in preparing an economic recovery progr~m. Ministry 20.0 Education VIII - Secondary education. Project being identified. of Education (IDA) Tanzania 20.0 Power IV - Rehabilitation of existing Appraisal mission scheduled Electric (IDA) diesel units and construction of a 75 for November. (Co-financing Supply Co. MW hydrostation on the existing Mtera possibilities being explored.) Limited dam with the necessary tunnel, trans- (TANESCO) mission line and substations. Total project cost estimated at $250.0 million. Ministry of 30.0 (N) Highways VI - Rehabilitation/ Project being prepared. Communication (IDA) strengthening of the Tan Zam and Transport Highway, and road maintenance. Ministry 5.0 (N) Coal Engineering - Engineering Project being prepared. of Mines (IDA) services for possible development of coal deposits in southern Tanzania. UGANDA Ministry To be (R) Reconstruction Credit II. Combined President's/Appraisal of Finance deter- Report under preparation. mined (IDA) Ministry of 35.0 (R) Roads III - Rehabilitation of trunk Project preparation underway. Works (IDA) road; re-equipping of maintenance unit, technical assistance; some upgrading, and construction of vital links under consideration. Total project cost estimated at $54.8 million. See page 1 for footnotes. t-1· - 12 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Jj Lender'!:._/ Procurement!!._/ UGANDA (Cont'd) Ministry of 26.6 (R) DFC I - Credit for the rehabilitation Appraisal report under preparation. Industry (IDA) of industry. Ministry of 3.4 (R) Phosphate Engineering - Feasibility Combined President's/Appraisal Industry (IDA) and engineering studies preparation; Report being completed. Nego- audits of existing facilities; and a tiations scheduled for end- survey of possible additional November. deposits. Total project cost estimated at $3,8 million. Ministry of 40.0 Education III - Rehabilitation of the Project preparation underway. Education (IDA) school system and reconstruction of school infrastructure. Ministry of 30.0 Export Crops Promotion - Program Identification mission scheduled Agriculture (IDA) credit type operation to help for November. restore production of export crops. ZAIRE Department 26,0 (R) Onatra Modernization - River trans- Approved by the Executive Directors of Trans- (IDA) port equipment, shipyard equipment; on October 6. (Co-financing has portation railroad equipment; training, Total been agreed with KfW-Germany, ADB., (ONATRA) project cost estimated at $84.0 and BADEA.) million. GECAMINES About (R) Gecamines II - Rehabilitation, main- Appraisal mission tentatively 41.0 tenance and expansion of existing scheduled for December/January. (IDA) mining facilities. Total project cost to be determined. Societe 17.0 (R) Shaba Power System - Rehabilita- Negotiations scheduled for November. Nationale (IDA) tion of power plants in Shaba. Total (Co-financing agreed with Belgium d'Electricite project cost estimated at and the OPEC Fund.) (SNEL) $37.0 million. IDA Project Preparation Facility advance of $500,000 will finance consultant services for work planning, document preparation, and bid evaluation. Regie de pro- 12.0 (R) Water Supply II - Distribution to Negotiations scheduled for duction et (IDA) several cities. Total project December. distribution cost estimated at $26.8 million. d'eau et d'electricite (REGIDESO) Department of About (R) Highways V - Continuation of Highway Appraisal report being prepared. Transportation 40.0 Maintenance Program. Total project (Co-financing of $75.0 million (IDA) cost estimated at $180.2 million. will be required.) Department 40.0 (R) Ports I (ONATRA) - Rehabilitation Appraisal mission scheduled of Trans- (IDA) of Matadi and Kinshasa Ports; total for March. IDA Project portation project cost estimated at Preparation Facility advance (ONATRA) $120.0 million. of $1.0 million has financed consultant services to begin preparation of design and tender documents, bid evaluation, and contract negotiation. (Co- financing will be required.) Department About (R) Cotton II - Rehabilitation including Negotiations tentatively scheduled of 11.0 road rehabilitation; extension for December. Agriculture (IDA) services, spare parts, farm tools and social infrastructure. Total project cost estimated at $39.3 million. See page 1 for footnotes. - 13 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency];__/ Lender'!:_/ Procurement!!._/ ZAIRE (Cont'd) Department About (R) NE Ituri II - Improvement of Appraisal mission in the of Agriculture 10.0 productivity of farmers' livestock field. (IDA) and agricultural holdings through provision of inputs and extension services. Total project cost estimated at $15.0 million. SOFIDE About (R) DFC VI - Sixth DFC credit to SOFIDE Appraisal report being prepared. 21.5 including lines of credit for invest- (IDA) ments; pre-investment/policy studies and for technical assistance. Department About (R) Agricultural Technical Assistance - Negotiations tentatively scheduled of Agriculture 5.0 Technical assistance to. strengthen for December. (IDA) Ministry of Agriculture and Rural Development. Total project cost estimated at $5.8 million. ZAMBIA Ministry of About Rural Water Supply - Provision and Appraisal report under prepara- Agriculture 15.0 extension of water supply in six tion. and Water (IDA) rural districts and institution Development building. Total project cost estimated at $28.3 million. Ministry of 25.0 Education V - Assistance for expansion Appraisal report under prepara- Education (IDA) and improvement of basic education; tion. (Co-financing with ADF and Culture maintenance program • . ~otal project being explored.) cost estimated at"$46.6"million. Ministry of 11.0 Eastern Province Agricultural Awaiting authorization from Agriculture (Bank) Development - Expansion of agri- Government agencies for signing and Water cultural production in the Eastern loan. Development Province through strengthening extension and marketing services and providing farm inputs on credit. Total project cost estimated at $29.0 million. Ministry of 18.0 (R) Southern Province Agricultural Board presentation scheduled for Agriculture (IDA) Development III - Expansion of agri- December. and Water cultural production in the Southern Development Province through strengthening extension and marketing services, and providing farm inputs on credit. Total project cost estimated at $24.6 million. Ministry of About (R) Forestry III - Expansion of the long- Project preparation underway. Lands and 11.5 term planting and maintenance program Natural (Bank/ for industrial plantations. Resources IDA) Ministry of About Fisheries - Improvement of fish Project preparation underway. Lands and 7.0 production systems and marketing Natural (IDA) channels. Resources Ministry of About Mining Rehabilitation - Rehabilita- Appraisal mission scheduled for Mines 60.0 tion of copper mining facilities; November. (Co-financing (Bank) exploration and training programs, being explored.) technical assistance. Ministry of 7.5 (R) Dairy - Introduction of improved Board presentation scheduled Agriculture (IDA) production techniques and services for December. and Water to increase milk production. Total Development project cost·estimated at $11.6 million. See page 1 for footnotes. - 14 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency !_/ Lender 'l:_/ Procurement!!._/ ZAMBIA (Cont'd) Development About (R) DFC III - Third Line of Credit to Appraisal report under preparation. Bank of 19.0 Development Bank of Zambia. Zambia (Bank) Ministry of About (R) Refinery Engineering - Feasibility Negotiations tentatively scheduled Industry 3.0 study for modification of Indeni for March. (IDA) refinery, audit of _existing facilities, engineering and technical assistance during implementation. Ministry of About (R) Petroleum Exploration - Geophysical Pre-appraisal mission scheduled Mines 6.2 surveys, technical assistance, for mid-November. (Bank) training and equipment. ZIMBABWE Ministry of About Agriculture - Small farm credit: Appraisal underway. Agriculture 40.0 Credit to farmers in the higher (Bank/ potential areas. IDA) Ministry of About Power I - To be identified. Appraisal scheduled for November. Industry 80.0 and Energy (Bank) Ministry About Highways I - Construction and Appraisal mission scheduled for of Roads 30.0 improvement of state roads, January. and Road (Bank/ feeder roads and training. Traffic IDA) Ministry About (R) Intensive Rural Development Area Appraisal mission scheduled for of 10.0 Project I - Rural development project February. Agriculture (IDA) in former tribal trust lands. Ministry of About (R) Manufacturing Rehabilitation: Identification mission in the Finance 45.0 Imports Program Loan II - Provide field. (Bank) foreign exchange for underutilized capacity in manufacturing sector. Ministry of About DFC I. To be determined. Project identification underway. Industry 30.0 and Energy (Bank) Local About Urban I - To be determined. Project identification underway. Government 20.0 and Housing (Bank/ IDA) See page 1 for footnotes. - 15 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender 2/ Procurement'!_/ ---- II. WESTERN AFRICA BENIN Ministere de 14.0 (R) Education II - Construction and equip- Appraisal report being prepared. l'Enseignement (IDA) ment of three teacher training IDA Project Preparation Facility Moyen General, colleges, construction of facilities advance of $400,000 approved Technique et and provision of tech~ical assistance to prepare architectural studies Professionel for production and distribution of and bidding· documents. (Co- teaching materials, and technical financing will be required.) assistance for project implementation. Total cost estimated at $25.6 million. Ministere de l' 5.0 '(R) Technical assistance for development Negotiations scheduled for mid- Industrie, des (IDA) of appropriate policies for petroleum November. Two advances totalling Mines et de l' exploration, assessment of enhance- $1 million under the IDA Project Energie ment methods proposed for exploitation Preparation Facility have been of Seme oilfield, training and insti- approved to finance consultants to tution building. (a) review geophysical and geo- logical data, prepare a work program for oil exploration outside the Seme field and to formulate an exploration strategy; (b) prepare a training program for Beninese nationals. Ministere de 5.0 (R) Cotonou Priority Works and Credit signed on October 23. l'Industrie, (IDA) Engineering Assistance Credit. des Mines et de Extension of water distribution l'Energie system, drainage and studies. Total cost estimated at $6.3 million. Governments 3.8 (R) Engineering design and preparation Board presentation on November of Benin (IDA) of tender documents for the regional 10. An advance of $400,000 and Togo Nangbeto hydroelectric project. each for Benin and Togo Total cost $5.0 million, of which under the IDA Project Preparation $4.7 million in foreign exchange. Facility has been approved to finance project preparation. (Co- financing has been arranged with FAG.) Procurement: Retroactive financing of $1.12 million to cover consulting services being proposed. Government 15.0 (R) Zou Province Rural Development III: Appraisal scheduled ror November. of Benin (IDA) Integrated rural development, with emphasis on food crop production and involving strengthening extension, training, ma~keting services as well as applied research and seed production. Total project cost about $50.0 million. CAMEROON Ministere 40.0 (R) Urban Development Sites and Services Negotiations tentatively scheduled de l'Urbanisme (IDA) in Yaounde and Douala; squatter set- for early 1982. (Co-financing with et de l' Habitat tlements upgrading in Douala. Switzerland of about $7.0 million under consideration.) Procurement: Retroactive financing of-approximtely $3.0 million for civil works, detailed engineering and technical assistance to be recommended. To be 32.0 Wood Processing Industries. Total Project preparation underway. determined (Bank) cost about $37.0 million plus $10.0 million for infrastructure. See page 1 for footnotes. - 16 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}:_/ Lender 'l:_/ Procurement 4/ CAMEROON, (Cont'd) Ministere de 100.0 Roads V - Construction of one section Appraisal report being reviewed. l'Equipement (Bank) of a paved road between Douala and (Co-financing considered with Yaounde; preparation of transport plan. Abu Dhabi Fund, AfDB, BADEA, Total cost of overall program esti- Canada, FED, France, Islamic mated at $390.0 million. Total cost Bank, Kuwait Fund, and of Bank-financed section estimated Netherlands.) at $272 million of which foreign exchange component $211 million. Ministere de 17.0 (R) Forestry project - Pulpwood planta- Negotiations scheduled for l'Agriculture (Bank) tion to supply the Cellucam pulp- December. (CDC has indicated through Fonds mill of Edea; pole and utility desire to co-finance Edea National Forestier timber plantations to supply the plantation component.) et Piscicole Northern Province; fuel and pole (FNFP) plantation for the Maga area. Total project cost estimated at $35 .5 million. Office National 20.0 (R) Ports Ill - Extension of general Appraisal report being prepared. du Port (Bank) cargo facilities, with provision Pre-qualification of contractors for banana handling and floating for civil works under review by craft, and extension of data Cameroonian authorities. processing system. Total project cost $30 million. Ministere de 10.0 (R) Technical Cooperation II - To Credit signing on November 5. l'Economie et (IDA) increase absorptive capacity du Plan through cooperation in develop- ment planning, policies/programs for agriculture, energy, industry, social development, and external debt management. · Ministere des 7. 5 (R) Technical Assistance - To Board presentation scheduled Pastes et Tele- (Bank) establish a commercially- for December. communications oriented post and telecommunication corporation; improve technical training; and prepare an investment program, including telecommunications projects for external financing. To be 50.0 (R) Tree Crops - Bring to maturity Appraisal report being prepared. deter- (Bank) 9,000 ha. of rubber and 6,800 ha. mined of oil palms. Preparation of all the above areas for exploitation. Provision of additional processing facilities for CAMDEV' s rubber- ·estates. Replanting of about 3,700 ha. of rubber and up to 700 ha. of oil palm on CAMDEV's estates. Provision for small-holders. Total project cost about $154.0 million. Ministere de 40.0 Education IV - Qualitative improve- Preparation underway. l'Education (Bank) ment of primary and secondary tech- nationale nical education through teacher training, curriculum development, textbook production, rehabilitation of workshops and laboratories, and establishing an equipment maintenance unit. Strengthening of educational planning and administration; improv- ing organizational and upgrading capacity of the General Inspectorate of the State. Total project cost about $60 million. CAPE VERDE Ministry of 5.0 Inter-island Shipping - Purchase of IDA Project Preparation Transport (IDA) replacements and additions to inter- Facility advance of island fleet, technical assistance $100,000 approved, to for nautical training school, con- finance the first stage sulting services and transport survey. of project preparation. See page 1 for footnotes. - 17 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency y Lender 'l:_/ Procurement 4/ CAPE VERDE (Cont'd) Ministry 7.0 Port of Praia - Rehabilitation of the Appraisal awaiting preparation of (IDA) port, technical assistance. of bidding documents. IDA Transport Project Preparation Facility advance of $100,000 approved to finance consultant's services. (Co-financing by Portugal for engineering and construction. Additional co-financing will be required.) CENTRAL AFRICAN REPUBLIC Ministere des 18.0 (R) Highways IV - Road rehabilitation Appraisal report being prepared. Travaux Publics (IDA) program. Total project cost IDA Project Preparation et de l'Urbanisme estimated at $54.S million, of Facility advance of $490,000 which $41.4 million in foreign approved. (Discussions with exchange. potential co-financiers in process.) Ministere 15.0 (R) Cotton Areas Integrated Rural Preparation underway. Follow-up de l'Agriculture (IDA) Development - Rehabilitating and on feasibility study to begin et de improving the production of cotton in November. l'Elevage and food crops; strengthening SOCADA, the proposed executing agency. Total project cost about $60.0 million. CONGO, PEOPLE'S REPUBLIC OF THE Ministere des 8.0 Third Highway Project - Road Main- Appraisal report being prepared. Travaux Publics (IDA) tenance including procurement of Report on preparatory studies, et de la equipment and spare parts, workshop by consultants under IDA Project Construction improvements, and technical assistance. Preparation Facility advance Total cost estimated at $16.0 of $125,000, has been completed. million, of which $12.0 million in foreign exchange. To be 6.0 (R) Forestry - Logging and processing Findings of preappraisal mission determined (IDA) unit in the northern provinces near reviewed. Feasibility study being Ouesso, and technical assistance for carried out by consultants and sector institutions and poiicies. financed under IDA Project Preparation Facility advance of $250,000. Agence Trans- 17.0 (R) Rehabilitation and expansion of Approved by the Executive Directors congolaise des (IDA) river transport services; equipment on October 6. C<;>mmunications and technical assistance to improve (ATC) ·waterways, services and administration. EQUATORIAL GUINEA Ministerio de 7.0 Technical assistance in the petro- Preparation underway. Industrias, (IDA) leum sector. Minas y Energia THE GAMBIA Ministry of 8.0 Agricultural Development Project - Appraisal delayed, pending reorganiza- Agriculture (IDA) Second phase of ongoing Rural Develop- tion of the credit system and and Natural ment Project (Credit 644) would strengthening of management under the Resources include support for: traditional First Rural Development Project. IDA farmers, including extension, input Project Preparation Facility advance of supply and marketing services on a $300,000 to finance detailed country-wide basis; the national architectural and engineering designs and seed multiplication scheme and preparation of tender documents for the research into irrigated and upland buildings. (Possible co-financiers: food crops; and possibly for live- ODA, IFAD, and USAID.) stock marketing and rehabilitation of small irrigation schemes. See page 1 for footnotes. - 18 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency )j Lender 'l:._/ Procurement !:_I THE GAllBIA (Cont'd) Ports Authority 6.5 (R) Second Banjul Port Project - Rehabil- Appraisal report being prepared. (IDA) itation of Banjul Port facilities; IDA Project Preparation construction of new berth, floating Facility advance of $480,000 craft and spare parts for existing approved to finance the com- cargo handling equipment, technical pletion of the feasibility assistance, and emergency rehabili- study, preparation of tation works. engineering design and tender documents, and carrying out soil and siltation studies; Also, $500,000 for certain related emergency rehabilitation works. Contract for these emergency works expected to be signed shortly. Procurement: Prequalification of contractors for civil works completed on August 20, and review of draft tender documents by co-donors underway. (Co-financing with AfDB, and possibly, Germany.) Ministry of 1.5 (R) Energy - Technical assistance for Board presentation on Economic (IDA) geophysical studies and energy November 3. Planning and sector planning, including forestry; Industrial training; and improvements to Development power distribution facilities. To be 20.0 Assistance to small-scale Further reporting to be discontinued determined (IDA) enterprises. pending review of industrial sector. Ministry 15.0 (R) Urban development including sites Project preparation financed by of Works (IDA) and services and upgrading in Accra. an IDA Project Preparation & Housing, Total original cost estimated at Facility advance of $175,000 or a new $43.9 million, of which about $10.0 underway. agency million was the foreign exchange component. Cost figures will be revised at reappraisal. To be 45 .o (R) Cocoa III - Replanting and rehabil- Pre-feasibility studies have determined (IDA) itation of existing cocoa areas; been completed. technical assistance for training and institution building. Ghana Water 10.0 Water Supply Technical Assistance Negotiations substantially and Sewerage (IDA) and Rehabilitation - Managerial, completed. An IDA Project Corporation financial, operational assistance to Preparation Facility advance, (GWSC) Ghana Water and Sewerage Corporation not to exceed- $400,000, has and rehabilitation of the water supply been approved for the services facilities in the Accra-Tema area; of technical assistants to project preparation assistance. Total organize the administration cost about $13.0 million, of which and expedite the start-up of $10.0 million in foreign exchange. activities. To be To be Rehabilitation of wood industry, Project preparation completed. determined deter- forestry operations, forestry and Decision to appraise awaiting mined forest industries development Government policy decisions. (IDA) planning study, strengthening of (Co-financing will be required.) institution. Ghana Highway 10.0 (R) Fourth Highway - Rehabilitation of Project preparation underway. Authority (IDA) bridges and main roads, extension of An advance of $1. 0 million the road maintenance program, and from the IDA Project Pre- technical assistance. Total cost paration Facility has been estimated at $200 million, of approved to finance the which $110.0 million in foreign feasibility study. (Co- exchange. financing will be required.) See page 1 for footnotes. - 19 - Meffiber Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agenc,r_ I._/ Lender 2/ ---- Procurement 4/ ~ (Cont'd) To be 9.0 (R) Petroleum Pre-development - Technical Project preparation, financed by determined (IDA) assistance, studies and surveys IDA Project Preparation Facility needed for petroleum exploration, advance of $340,000, underway. strengthening petroleum institutions and energy planning assistance. Total cost estimated at $10.0 million of which $9.5 million in foreign exchange. To be 7.0 Public.Administration Technical President's Report being prepared. determined (IDA) Assistance to strengthen the Office Project preparation financed by of the Head of Civil Service; moni- ·an IDA Project Preparation toring and supervision of parastatals; Facility advance of $155,000. and retraining and redeployment of (Commonwealth Fund and UNDP staff. Total cost about $11.3 milli~n have expressed interest in co- of which $8.9 million in foreign financing.) exchange. Ghana Oil Palm 15.0 Oil Palm I I - Consolidation and Appraisal report being prepared. Corporation (IDA) completion of activities undertaken (GOPC) under ongoing Oil Palm I project through continued provision of tech- nical assistance, management support, training and developmental operating costs. Extension of existing small outgrower planting program. Total cost about $37.9 million of which about $10.0 million in foreig~ exchange. El·ectric 20.0 Fourth Power Distribution - Rehabili- President's Report being prepared. Corporation (IDA) tation of ECG's distribution network, (ODA has expressed interest in of Ghana system maintenance, technical assis- co-financing. the training component (ECG) tance and training. Total project by a grant of about $2.0 million.) cost estimated at $26.0 million, of which $20.6 million in foreign exchange. To be To be Export Rehabilitation Credit. Spare Project appraisal underway. deter- deter- parts and foreign input requirements of mined mined cocoa, forestry, gold mining sectors, (IDA) as well as commercial trucking fleet and technical assistance. GUINEA Ministere 50.0 (R) Nimba Iron ore mining and beneficia- Technical partner and manager des Mines (Bank) tion with evacuation via e~istin_g agreed. Feasibility studies et Geologie facilities in Liberia. to be revised and finalized. Ministry of 17.0 (R) Industrial Rehabilitation - Appraisal report being prepared. Industry (IDA) Rehabilitation of selected public IDA Project Preparation and Credit sector industrial enterprises, Facility advances of $290,000 National promotion of privately-owned small- and $240,000 approved. (Co- and medium-scale enterprises, financing with OPEC Fund, CIDA technical assistance for industrial and EEC identified.) planning and to project institutions. Ministry of 10.0 (R) Port of Conakry - Rehabilitation German-financed feasibility study Transport (IDA) of port facilities, provision of completed. The Government cargo handling equipment, technical has agreed, in principle, to assistance to improve port adminis- establish an autonomous port authority. tration and operations •. Total cost Appraisal mission tentatively rescheduled about $20.0 million.· for February.. ( Co-financing of project by Federal Republic of Germany anti- cipated.) s.ee page. 1 for. footnotes. - 20 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency l_/ Lender 3_/ Procurement':!._/ GUINEA (Cont'd) Ministry 10.0 (R) Education II - Construction of Preparation underway. Appraisal of Higher (IDA) facilities and provision of equip- mission tentatively scheduled for Education, ment, tec.hnic.al assistance and early 1982, (Possible c.o-financ.ing Ministry fellowships for 3 existing with AfDB.) of Pre- industrial vocational schools; 2 University primary teacher training colleges Education and the pedagogic.al institute; curriculum development and textbook production for primary education; strengthening of educational and manpower planning; equipment, technical assistance and fellowships for project implementation. Total c.ost estimated at $25.4 million. Ministry 15.0 (R) Highways III - Rehabilitation and Feasibility study of Conakry-Mamou of Public (IDA) strengthening of Conakry-Mamou Road, Road being finalized, Other Works Periodic. resealing and regravelling components being prepared. (Co- of trunk roads, Assistance to road financing being sought.) transport and domestic. construction industries. Preparation of a transport plan. Technical assistance to Ministry of Public Works. Total c.ost about $95.0 million, of whic.h $71,0 million in foreign exchange. GUINEA-BISSAU Ministry of 14.0 (R) Rehabilitation of Bissau Port; Appraisal mission deferred to Transport (IDA) technical assistance for port January to allow time for management and operations. May completion of soil borings include rec.onstruc.tion of some required under feasibility study. riverine ports. Consultants, under IDA Project Preparation Facility advance of $800,000, to complete studies. (Co-financing with Kuwait Fund and BADEA envisaged.) IVORY COAST Regie 30.0 (R) Railways II - Realignment Petionara- Railway investment plan being Abidjan- (Bank) Tafire; track renewal in Ivory Coast discussed with Government and Niger and Upper Volta; locomotive main- borrower. Appraisal processing (RAN) tenance facilities; railway equip- will follow agreement on RAN's ment, consulting services and overall investment progr~m, to training. Total cost about $91.0 be reviewed at co-donors meeting 'million. not yet· scheduled. ( Co-financing with CCCE and CIDA en~isaged.) Ministere 51.0 (R) Urban Development II - Deveiopment Loan signed on October 9, des Travaux (Bank) of transport infrastructure and Publics et management in Abidjan; basic infra- des Transports structure in secondary cities and assistance to urban agencies. PETROCI 100 .O (R) Petroleum development. Appraisal report being prepared. (Petrole de (Bank) la Cote d'Ivoire) Ministere des 40.0 Improvement of water supply and Appraisal report being reviewed. Travaux Publics (Bank) sanitation in Abidjan and other et des urban centers. Transports Ministere de 15.0 (R) Centre-West Rural Development - Appraisal report being reviewed. l'Agric.ulture, (Bank) Strengthening regional agricultural (Co-financing with CCCE SATMACI development agency; development of envisaged.) smallholder crops; co-operatives; applied research; staff retraining. Total c.ost $55.1 million, See page 1 for footnotes. - 21 - Member Country, and Borrower or Amount & Stage of Process- Implement_ing Probable ing and Action on Agency y Lender 2/ ---- Procurement':_/ IVORY COAST (Cont'd) Government of 50.0 (R) Soubre Hydroelectric Project. Con- Appraisal mission in the field. Ivory Coast (Bank) struction of dam on Sassandra River; (Co-financing will be required.) and Energie powerhouse, civil works, equipment, Electrique de resettlement and engineering. 328 MW la Cote d'Ivoire capacity to meet growing demands in Ivory Coast. Total cost in 1980 prices estimated at $540.0 million. Government of 150.0 (R) Loan for structural adjustment. Board presentation scheduled Ivory Coast (Bank) for November 24. Government of 16.0 (R) Loan for technical assistance. Board presentation scheduled for Ivory Coast (Bank) November 24. LIBERIA Ministry of 3,0 Education IV - Ministry of Education Project preparation underway Education, (Bank) institutional development; develop- financed by an IDA Project National Youth 6.0 ment and purchase of textbooks; in- Preparation Facility advance and Sports (IDA) service teacher training; primary of $500,000. Appraisal scheduled Commission, school development; establishment for first quarter of 1982. (Co- and University of commercial training center; financing will be required.) of Liberia university staff development. Total cost estimated at $20.0 million, of which $9,0 million in foreign exchange. To be To be Rural Development I - Technical and Project scope being reviewed. determined deter- financial support.for rur~l develop- mined ment institutions,·development of' smallholder production, and rural infrastructures in three south- eastern counties. Ministry 13 ,Q (R) Highways V - Road maintenance; Pre-appraisal mission scheduled J. of Public (Bank) technical assistance and fellowships for November. (Co-financing will Works to Ministry of Public Works. Total be needed.) cost estimated at $37.0 million of which $24.0 million in foreign exchange. Monrovia 10.0 (R) Urban development including Board presentation tentatively City (IDA) upgrading, assistance in land and scheduled for early December. Con- Corporation ownership registry and institu- sultants' services, equipment tional development. Total cost and training being financed by estimated at $13.3 million, including an advance of $450,000 under foreign exchange costs of $6,7 mil- Bank Project Preparation Facility. ·lion. Ministry of 10.0 Agricultural Development (LOFA) II - Appraisal report being prepared. Agriculture (IDA) Expansion of existing project (Co-financing will be required.) activities in LOFA county and into new areas of the county. It will strengthen agricultural services and develop swamp rice, upland rice, cocoa and coffee, and provide feeder roads and wells. Totaf cost estimated at $27.8 million of which $13.6 million in foreign exchange. Ministry of 18.0 (R) National Iron Ore Company (NIOC) - Board presentation scheduled for Lands and (Bank) Rehabilitation of mining equipment, December 22. Preparation financed Mines, and construction of ore surge facility; by Bank Project Preparation Facility National improvements in concentrator; repair advance of $1.0 million. (ADB, OPEC Iron Ore of railroad and railways bridge; Fund and Netherlands, FMO considering Company financial restructuring of company. co-financing; commercial bank financing (NIOC) Total cost estimated at $51,1 mil- needed for working capital.) lion, of which $45.4 million in foreign exchange costs. Procurement: Retroactive financing may be recommended. See page 1 for footnotes. \ - 22 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency];_/ Lender'!:_/ Procurement'±_/ MALI Office de 6.5 Technical Assistance to ODIPAC Approved by the Executive Directors Developpement (IDA) aimed at: increasing the effi- on July 28. Financing to help Integre de ciency of agricultural production in preparation was provided for la Production through the retraining of extension by an advance of $50,000 under d'Arachides staff, improving seed production, IDA Project Preparation et de distribution and storage, and Facility. (Co-financing with Cereales overhauling the credit and market- FAC for $2.5 million.) (ODIPAC) . ing system; promoting the estab- lishment of self-managed farmers' organizations able to take over village development activities; testing diversification programs to reduce the area's dependence on groundnuts as an export crop. Total cost $11.4 million of which $6.6 million in foreign exchange. Office des 11.0 (R) Second Telecommunications Project - Negotiations scheduled for Pastes et (IDA) Completion of Mali main transmis- November. IDA Project Prepar- Telecommuni- sions route, including the micro- ation Facility advance of cations du Mali wave section Segou-San Sevare and $310,000 approved for consulting the Apur VHF links Sevare-Mopti, services for detailed Sevare-Bandiara-Sanga and Segou- design of local networks, Dioro; supply and installation of updating bidding documents; 1,400 lines of switching equipment provide financial expertise in four towns, including construction to Office des Pastes et of telephon·e exchange buildings; Telecommunic.ations du Mali. rehabilitation and extension of local Consultants studies underway. networks; engineering consultants for (Co-financing with CCCE/FAC.) detailed engineering of network extensions, preparation of bidding documents, and assistance in o.t.gardzing maintt:?11ance programs; consultants to study organization of postal and financial services and establishment of training programs. Total cost estimated at $25.3 million of which $18.3 million in foreign exchange. Office du 5.0 (R) Gasohol Production of ethyl Appraisal report being prepared. Niger (IDA) alcohol from surplus molasses, Studies on feasibility of modification of existing introducing gasohol, financed distillation facilities and by IDA Project Preparation provision of infrastructure to Facility advance of $50,000, have handle and store ethyl alcohol for been completed. eventual blending with gasoline. Energie du 26.0 (R) Power/Water - First phase of two- Negotiations scheduled for early Mali (EdM) (IDA) stage program to extend power December. Project prepared with distribution; rehabilitate utility; advance of $970,000 from IDA Project promote fuel savings through intro- Preparation Facility. (Co-financing duction of biomass fuels and initiate with OPEC and CCCE/FAC.) preliminary reforms in the water sector. Total cost estimated at $43.2 million of which $41.2 million is foreign exchange. Ministere 12.0 (R) Rural water supply in the Western Pre-appraisal mission scheduled du (IDA) Region - Project to be executed for February. IDA Project Developpement in parallel with IDA Health Preparation Facility advance of Industriel Project. $440,000 approved; consultants appointed for preparation of studies. Compagnie 20.0 (R) Mali Sud II - (i) extension of Appraisal report being prepared. Malienne pour (IDA) production of cotton, maize and (Co-financing with CCCE/FAC and le Developpement rice; (ii) development of livestock the Netherlands envisaged.) des Textiles and (iii) strengthening of public health services. See page 1 for footnotes. - 23 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency y Lender y Procurement 4/ MALI (Cont'd) To be 15.0 (R) Rural Health, comprising (i) Appraisal mission scheduled for deter- (IDA) training, (ii) basic health program, Hay. An IDA Project Preparation mined (iii) drug supply and (iv) applied Facility advance of $350,000 has research. been approved to help preparation of the project. 'MAURITANIA Ministere de 3.5 (R) Fourth Highway Project- - Road Re-appraisal of project will be l'Equipement (IDA) maintenance study, preinvestment needed in light of ongoing discussions studies for pavement strengthening, with Government on project scope, completion of unpaved roads started (Kuwait Fund is financing $5.1 under Third Highway Project. Total million and Arab Fund for Economic cost estimated at $13.0 million, Development $4,4 million,) of which $10.4 million in foreign exchange. Ministry of 3.0 Petroleum exploration promotion Approved by the Executive Directors Energy and (IDA) project. on August 25. Project prepared with Mines advance of $800,000 from IDA Project Preparation Facility. Ministere 5.5 Education II - Strengthening of Appraisal report being prepared, de l'Education (IDA) educational planning and administra- An IDA Project Preparation Facility Nationale tion, training of lower secondary advance of $400,000 has been Ministere school teachers, and vocational approved for: professional fees de l'Emploi training for the Fisheries and for architectural design work of et de la Industrial Sectors. Total cost project-financed buildings; Formation about $16.7 million. specialists ser.vices for project des Cadres; management and start-up of project Minis tere de la institutions; scholarships for the 'r I Peche et de training of local instructors, l""Economie (Co-financing with AfDB and EEC.) Maritime To be 5.Q (R) Technical Assistance to the Rural Appraisal mission in the field, deter- (IDA) Sector. mined Ministry of 3.5 Second Technical Assistance Appraisal report being prepared, Economy and (IDA) Project for Planning. Finance NIGER Ministere 27.0 (R) Highways IV - Strengthening and Appraisal mission in the field, des Travaux (IDA) resealing of bitumen roads, road Publics construction, training of road maintenance personnel. ·Total cost estimated at $50.0 million of which $30.0 million in foreign exchange. Ministere 10.0 (R) Technical assistance for project Project content being reviewed du Plan (IDA) preparation and to strengthen by Government. planning, monitoring, and evalua- tion capabilities of Ministry of Plan and technical ministries, Total project cost estimated at $8,0 million, of which $6,9 million in foreign exchange. Banque de 16.0 Employment Creation II - A follow-up Appraisal report being Developpement (IDA) project consisting of a line of credit ·prepared. de la Republique to BDRN, technical assistance to du Niger (BDRN)/ OPEN, and development of leather Office de Promotion crafts, de l'Entreprise Nigerienne (OPEN) See page 1 for footnotes, - 24 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency lf Lender'!:_/ Procurement!:_/ NIGER (Cont'd) Ministere de 11,0 Forestry II - Establishment ·and Appraisal report being prepared, Developperoent (IDA) management of state-managed and (Co-financing with FAC and Rural rural forestry plantations; CCCE,) management of rural forests; soil conservation program; institution building; establishment and monitoring of rural mini-nurseries, Total project cost estimated at $17,0 million, of which $8,0 million in foreign exchange. Ministere de 30,5 (R) Irrigation Rehabilitation Project - Financing to help preparation Developpement (IDA) To rehabilitate existing irrigation was provided for by an advance Rural works; procure equipment for main- of $900,000 from the IDA tenance and operation of irrigation Project Preparation Facility, works; supply agricultural inputs; train project staff, cooperative managers and farmers, Ministere de 5,0 (R) Water Supply - Technical Assistance Appraisal mission scheduled l'!lydraulique (IDA) and Rehabilitation, Total cost for end-November, (Co-financing estimated at $7,0 million, with UNDP being sought,) Ministere de 10,0 Small Rural Operations - Small-scale Preparation underway. Developpement (IDA) irrigation and bottomland development Rural schemes; cooperative and group support activities; medium term loans to farmers, Federal 145,0 Kaduna State Agricultural Develop- Appraisal report under review, Ministry of (Bank) ment would include a statewide Further processing awaiting decision Agriculture package of basic agricultural of State Government concerning services to farmers, and a feeder project organization and implemen- road and rural water program, tation, Total cost estimated at $375,0 million. Federal 117 ,0 Cocoa Project III - Four state- Appraisal report under review, Ministry of (Bank) wide smallholder cocoa projects, Further processing awaits State Agriculture Main components would be new Governments' decision concerning planting and replanting of cocoa, details. _of credit and financing. rehabilitation of existing cocoa; pest and disease control, feeder roads, strengthening of cocoa development units and staff and 'farmer training, Total cost esti- mated at $544,0 million, of which $41,0 million in foreign exchange, Federal 41.0 Small and medium-scale enterprise: Appraisal report being Ministry (Bank) pilot project, Total cost estimated prepared, of Industries at $72,7 million, Federal 34,0 (R) Cross River State Oil Palm - Expansion Following completion of soil Ministry of (Bank) and diversification of Cross River survey, further reporting will Agriculture Estates into oil palm production, be discontinued, pending dis- Total cost estimated at $75,2 million, cussions by the Nigerian authorities and Bank on most appropriate approach to assist oil palm sector, Federal 100,0 (R) Fertilizer project - Nitrogen Government has signed agreement Ministry of (Bank) complex at Onne, with foreign equity and Industries technical partner, and preappraisal mission tentatively scheduled for January, National 100,0 (R) Power VI (Distribution) - Power trans- Board presentation awaiting appoint- Electric (Bank) mission and distribution facilities ment of Consultants for design and Power for 23 cities and interconnection of supervision of project. (Co- Authority Lagos thermal plant, Total cost esti- financing may be required,) mated at $224.2 million, of which $148,5 million in foreign exchange. Procurement: Retroactive financing of $2,0 million proposed to cover consultant costs for project design and engineering, See page l for footnotes, - 25 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency'!_/ Lender 'l:._/ Procurement':._/ NIGERIA (Cont'd) Anambra 67.0 (R) Anambra Water Supply and Sanitation Loan signing scheduled for State Water (Bank) Expansion and improvement of water November 13. Bank Project Corporation supply and sanitation facilities in Preparation Facility advance of $415,000 Onitsha, provision of health and urban approved for consultants' services. development facilities, and strengthen- ing of implementing agency. Total cost Procurement: Retroactive financing estimated at $120.0 million, of which of up to $0.9 million to cover $67.0 million in foreign exchange. detailed design work and recruitment of operational experts. Federal 147.0 Sokoto Agricultural Develop- Board presentation awaiting Government Ministry of (Bank) ment - Extension of Gusau Agricul- decision on organization of fertilizer Agriculture tural Development Project (Ln. 1099), distribution. including statewide rural water and training programs and Procurement: Retroactive financing improvement of agricultural of up to $1.0 million proposed to service centers. Total cost cover hiring of key staff and other estimated at $499.0 million, of which project initiation costs. $221.0 million in foreign exchange. Federal 37.0 (R) Second Urban Development - Imo Board presentation awaiting Government Ministry (Bank) State. Total cost estimated at action on funding of ongoing projects of Housing $87.4 million, of which $37.0 in Imo State. million in foreign exchange. Procurement: Retroactive financing of $2 million proposed to cover project start-up costs from September 1, 1980. Kano State 115.0 Kano State Water Supply IV - Expansion Appraisal report being prepared. Water (Bank) of water supply facilities in Greater Resources Kano. Provision and/or expansion of Engineering water supplies in several semi-urban and Con- centers. T~tal cost estimated at struction $210.0 million, of which $115.0 Agency million in foreign exchange. Federal 70.0 (R) Third Urban Development - Ogun State, Consultants being selected Ministry (Bank) Ondo State and Benne State. to undertake feasibility study. of Housing Federal 35.0 Mambilla (formerly Sardauna) Agri- Appraisal report being prepared. Ministry (Bank) cultural Development - To develop of Agri- seasonal and permanent crops, live- culture stock and forestry by smallholders in a high-potential highland area through ·farmer services, general infrastructure and land reform. Total cost estimated at $80.0 million. Federal 150.0 (R) Imo State Agriculture Development - Preparation report being Ministry (Bank) This statewide project would reviewed by Government. of strengthen the existing Ministry Agriculture of Agriculture and Natural Resources to provide technical advice and support to farmers throughout the State. Total 'cost estimated at $200.0 million. \ Federal 150.0 (R) Borno State Agricultural Develop- Preparation report being Ministry (Bank) ment - This statewide project reviewed by Government. of would strengthen the existing Agriculture Ministry of Agriculture and Natural Resources to provide technical advice and support to farmers throughout the State. Total cost estimated at $400.0 million. Borno State 100.0 Borno State Water Supply - Improve- Feasibility report being pre- Water Board (Bank) ment and expansion of water supply prepared by Water Board, facilities iri.Maiduguri and other· ·assisted by Consultants. centers. See page 1 for footnotes. - 26 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}:_/ Lender~/ Procurement 4/ NIGERIA (Cont'd) Ministry of so.o Gari Irrigation - To strengthen Project preparation underway. Agriculture and (Bank) the existing Gari dam in Kano Water Resources- State and provide supplementary Kano State irrigation infrastructure and other support services for irrigated agriculture. Federal 60.0 Sakata Health - Construction and Consultants being selected to Ministry of (Bank) equipping of about 75 rural health complete project preparation. Health and clinics, technical assistance in Sokoto State training for staff development, Ministry of childhood immunization program, Health project monitoring, and institu- tional improvement of the Sokoto Ministry of Health. Project also includes strengthening institutional capacity of the Federal Ministry of Health. SAO TOME & PRINCIPE Ministry of s.o (R) First Power/Water - 4 MW diesel- Appraisal report being prepared. Energy and (IDA) ele.ctric power plant; reinforcement Project prepared by consultants Fisheries of distribution system; supply of financed by IDA Project transport and communications equip- Preparation Facility ment; technical assistance and train- advance of $350,000. (Co- ing; rehabilitation and extension financing will be required.) of water supply facilities and water supply master plan. Total Procurement: Retroactive cost estimated at $12.8 million. financing of $0.6 million to cover hiring of key staff, as well as urgent purchase of spares, materials, etc. to be proposed-. SENEGAL Secretariat 19.S Agricultural Research - Program of Approved by the Executive Directors d'Etat a la (IDA) works and technical assistance to on September 8. IDA Project Recherche improve the national agricultural Preparation Facility advance of $1 Scientifique research system and to strengthen million approved to finance consulting et Techniques the generation and transfer of services and eventual detailed agricultural technology. Total engineering studies. (Co-financing cost estimated at $106.1 million. with French Ministere de la Co- operation, USAID and UN technical agencies.) Office des 20.0 Telecommunications II - Extension of Preparation underway. Pastes et (Bank) Dakar telephone exchanges; extension of des Telecom- transmission network to the South and munications East of country; technical assistance. Government 15.0 Primary Health Care Project - Preparation underway. IDA Project of Senegal (IDA) including components for institution Preparation Facility advance of building, drug supplies, intermediate $95,000 approved to finance con- health facilities and information, sulting services for detailed and education programs. Total project preparation. estimated cost $20.5 million. To be 12.s Dome Flore Appraisal Drilling--Seismic Project preparation including deter- (IDA) tests and drilling to appraise light seismic work underway financed mined oil deposit and collect heavy oil by a $1,000,000 Bank Project samples; geological work; engineering Preparation Facility advance. study to develop light/heavy oil (Commercial drilling partner and fields; and technical assistance to cofinancers will be sought.) the Department of Mines. Preliminary project costs $17.0 million. See page 1 for footnotes. - 27 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency y Lender'!_/ Procurement ~/ SENEGAL (Cont'd) To be 26.5 (R) Irrigation IV - Rehabilitation of Appraisal mission tentatively deter- (IDA) 5,870 ha of irrigation perimeters scheduled for January. mined in the Senegal River delta; elec- trification of pumping stations at Rong Thiager and Boundoum; con- struction of a power line. Estimated total cost $63 million. SIERRA LEONE Ministry 10.0 (R) Highways II - Three~year maintenance Credit signed on October 29. of Works (IDA) program, including procurement of (OPEC Fund and ADF providing equipment, spare parts ·and toois; co-financing of $7.0 million staff training and technical and $8.2 million respectively.) assistance. Total cost estimated at $29.0 million of which $21.4 million in foreign exchange. To be 4.0 (N) Power IV - Technical assistance Preparation underway. deter- (IDA) to help finalize the Bambuna mined hydroproject and to initiate a National Power Authority. Spare parts for the Sierra Leone Electric Corporation. Total project cost estimated at $10.0 million. To be 37.0 (R) Power (Hydro) V - Development of Detailed engineering underway. determined (IDA) Bumbuna hydro plant on Seli river. (Co-financing will be required. Total project cost estimated at Co-financing meeting tentatively $300.0 million, of which $240;0 scheduled for. November /December.) million in foreign exchange. (NATIONAL Up to Industrial Finance Company - To Institutional issues being discussed DEVELOPMENT 5.0 provide a line of credit for small with Government. BANK (NDB)) (IDA) and medium enterprise development. Ministry of 10.0 Agricultural Services - Technical Preparation underway, financed in part Agriculture and (IDA) assistance to reorganize and under IDA Technical Assistance Project. Forestry strengthen Ministry's ability to deliver services to farmers; establishment of national rural credit program. Ministry of 10.0 Education III - Primary school Preparation underway. Appraisal Education (IDA) construction, primary teacher tentatively scheduled for first quarter training and upgrading, education 1982. materials and textbooks production, and goods and services for institu- tional improvements in education sector. TOGO Ministere des 20.0 (R) Highways IV - Road strengthening, Credit signed on October 28. Mines et des (IDA) road maintenance equipment; train- ($7.4 million loan from Travaux ing; pre-investment studies. Total OPEC Fund signed on July 25.) Publics cost estimated at $31.2 million including $25.2 million in foreign exchange. Office 5.7 (R) Studies and basic engineering for Credit signed on October 28. Togolais (IDA) phosphoric acid plant producing des 1,000 t/day. Phosphates .See page 1 for footnotes. - 28 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency y Lender 'l:_/ Procurement !!__/ TOGO (Cont'd) Governments 3.8 (R) Engineering design and preparation Board presentation on November 10, of B·enin (IDA) of tender documents for the regional An advance of $400,000 each for and Togo Nangbeto hydroelectric project, Total Benin and Togo under the IDA project cost $5,0 million, of which Project Preparation Facility has ~een $4,7 million in foreign exchange, approved to finance project preparation, (Co-financing has been arranged with FAC,) Procurement: Retroactive financing of $1,12 million to cover studie8 required for consulting services to be proposed. Ministere 14,0 (R) Rural Development II - Development Appraisal mission scheduled for du Developpement (IDA) of cotton and food crops production November/December. Rural by following up on the activities of the cotton project (Cr, 741), and, possibly, including viable elements of the Maritime project (Cr. 638), The project will include institution strengthening, provision of farm inputs and extension services, seed production, animal traction and infrastructure. Total cost about $40,0 million. UPPER VOLTA Ministere du 10,0 (R) Koudougou Pilot - Experimental program Appraisal report being prepared, Developpement (IDA) to improve production techniques and Rural farming systems, Regie Abidjan- 7.0 (R) Railways II - IDA funds would help Appraisal processing will follow Niger (IDA) finance Upper Volta's share of RAN agreement on RAN's overall invest- (RAN) railway project, Total project ment prog1am, c.u be reviewed at cost estimated at $72,7 million of co-donors meeting not yet scheduled, which $58,5 million in foreign exchange. Ministere 46,0 Highways IV - Four year phase Approved by the Executive Directors des Travaux (IDA) (FY82-85) of maintenance operations; on June 16, (Co-financing agreed Publics feeder roads construction and improve- with the Netherlands,) ments, Total cost estimated at $56,7 million, of which $45,0 million in foreign exchange. Ministere du 15,0 (R) Rural Development Fund III - Invest- Negotiations scheduled for end- Developpement (IDA) ·ments in small scale rural projects November. (Co-financing with Rural such as bottomland development, small the Netherlands and BOAD,) irrigation projects, erosion controls, open and tubewells, medium term credit for oxen, agricultural equipment and unidentified projects. Total project cost estimated at $28,9 million of which $17,0 million in foreign exchange, Ministere du 15,0 (R) West Volta II - Continuation of rural Appraisal report being prepared, Developpement (IDA) development in the ORDs of Bobo (Co-financing with CCCE/FAC, IFAD, Rural Dioulasso and Dedougou, including Canada, and the Netherlands continued development of extension envisaged,) services, expansion of cotton and food crops, support to village groups and expansion of ginnery capacity, Total cost estimated at $48.0 million of which $23,0 million in foreign exchange, Ministere 23,0 (R) Kompienga Hydroelectric Project, Appraisal tentatively scheduled des Travaux (IDA) Total cost estimated at $100,0 for early 1982, (Co-financing Publics million. will be required,) See page 1 for footnotes, - 29 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency"}) Lender 2/ Procurement 4/ ---- UPPER VOLTA (Cont'd) Ministere 17.0 (R) Telecom III - Expansion and upgrading Appraisal report being reviewed. des Postes (IDA) of telephone and telex facilities (Co-financing with France, The et Telecom- and increase penetration into rural Netherlands and Switzerland munications areas. Total cost estimated at $45.0 envisaged.) million, of which $28.5 million in foreign exchange. Ministere de 3.0 (R) Technical Assistance - Establishment Pre-appraisal completed. l'Economie et ,IDA) of Development Investment Budget du Plan to strengthen investment budgeting and monitoring development expenditures. Total project cost estimated at $3.0 million. See page 1 for footnotes. - 30 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency]:__/ Lender'!:_/ Procurement 4/ III. EAST ASIA AND PACIFIC CHINA Ministry 100.0 (R) ·university Development Project - Loan and credit signings on of (Bank) Technical assistance and equipment November 4. Education 100.0 to help improve the quality of (IDA) education and research in science and engineering. The project would also assist in strengthening the university management systems and preparing future education investments. Ministry To be (R) North China Plain Project - Provision Appraisal report being prepared, of Agri- deter- of irrigation and drainage culture mined facilities for approximately 200,000 ha of farm land. Project focuses on problems of soil salinity and provides agricultural support services. Ministry To be (R) Three Ports Project - Modernization of Appraisal report being prepared. of Com- deter- existing ports and provision of munications mined modern facilities to meet short- term requirements of increasing container traffic at Shanghai, Tranjfu and Huangpu. State To be (R) Agricultural Training and Preappraisal mission in the Agricultural deter- Research Project - Financing field. Commission mined for equipment and technical assistance to strengthen education and research capa- bilities at selected agricultural colleges and research institutes. China To be (N) Industrial Credit - Establishment Preappraisal mission Investment deter- ment and institutional development scheduled for mid- Bank (CIB) mined of the China Investment Bank (CIB); November. provision of credit through CIB to light industry. Ministry To be (N) Daqing Oilfield Development - Reser- Appraisal mission of deter- voir development and study of tentatively scheduled Petroleum mined enhanced oil recovery. for January. Ministry To be (N) Dongpu Oilfield Development - Explo- Project preparation of deter- ration and development of the oil- underway. Petroleum mined field. Ministry To be (N) Heilongjiang Grain Base - Development Project preparation of State deter- of 200,000 ha of uncultivated land underway. Farms and mined to grow wheat, soybeans and corn. Land Reclamation FIJI Ministry 20 .0 (N) Tree Crops - To develop a Project preparation by Govern- of Agriculture (Bank) variety of export crops ment with assistance from FAO. in various regions of the country. See page 1 for footnotes. - 31 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}_/ Lender 2/ Procurement!!._/ ---- INDONESIA Ministry of 85,0 (R) Small Towns Water Supply - Project preparation by Public Works (Bank) Assistance for urban and rural Government and consultants water systems in East Java, underway. Ministry of 100.0 Marine Transport Ill (Shipping and Project being prepared by Communications (Bank) Ports) - To develop selected ports, the Government, (Co-financing improve shipping, and possibly develop is envisaged,) dredging capability. Ministry of 75.0 (R) Transmigration III - Development of Appraisal report being prepared, Manpower and (Bank) transmigration schemes in East Transmigration Kalimantan. Ministry of 75 .o Watershed Development I - Integrated Project Preparation Facility Agriculture (Bank) program of reforestation, soil advance of $463,000 approved conservation, and related develop- to finance consultants and ment in Java. mapping services to advance the preparation of this project, Ministry 65.0 North Sumatra Transport - To Project being prepared by of Com- (Bank) develop transport system for Government and consultants. munications estates and other regional (Co-financing is envisaged,) goods and passenger traffic, P,N, Batubara 175,0 (R) Bukit Asam Coal Mining and Trans- Negotiations scheduled for mid- and Directorate (Bank) port - Rehabilitation and expansion November, (Co-financing is of States of Bukit Asam coal mine and the envisaged,) Railways necessary infrastructural (PJKA) improvements, The output of the mine would be transported for use at Suralaya Power Plant, Total project cost is estimated at $1 billion, Ministry of 22,0 (R) Education X - Textbooks and Negotiations scheduled for early Education (Bank) instructional material development, November, and Culture Ministry of 92,0 (R) Education XI - Second phase Appraisal report being Education (Bank) of teacher training program, reviewed. and Culture Ministry of 15.0 Seeds II - Second phase of seed Board presentation scheduled Agriculture (Bank) industry development covering for December, twelve provinces, Bank 45,0 (R) Industrial Finance I - Provision Further processing is being held Indonesia (Bank) ·of industrial financing to relevant in abeyance at request of DFCs, Government, Reporting will be discontinued, Ministries of 100.0 Rural Roads·- Programs to improve Negotiations scheduled for Home Affairs (Bank) rural road operations, including mid-November, and Public new construction, betterment, and Works maintenance in about 25 selected districts, Ministry of 85.0 (R) Jakarta/Cikampek Highway - Con- Loan signed on October 9, Public Works (Bank) struction of toll road and improve- ment of existing road between these two cities, See page 1 for footnotes. - 32 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency ];_! Lender '!:_/ Procurement!!._/ INDONESIA (Cont'd) Ministry of 100 .0 (R) Central Java - Pulp and Paper - A pulp Appraisal mission scheduled Industry (Bank) and paper complex in Central Java. for early January. (Co- It will include a pulp and paper plant financing is envisaged.) and mechanical wood industries. Ministry 75.0 (R) Education XII - Public Works Manpower Project preparation underway. of Public (Bank) Development Project. Works Ministry of 75.0 (R) Nucleus Estates VI - Assistance to Appraisal report being prepared. Agriculture (Bank) smallholders through nucleus estates. (Co-financing envisaged.) Ministry of 70.0 Jakarta Sewerage I - Improvement of Project being prepared with Public Works (Bank) Jakarta sewerage system. the help of consultants. Ministry of 40.0 Urban V - Urban services and infra- Project being prepared Public Works (Bank) structure improvement in East Java by the Government. cities. Ministry of 170 .0 (R) Power XI - Transmission and dis- Board presentation on Mining and (Bank) tribution networks in Java from November 10. (Co-financing Energy 1982-86. Estimated cost $1.1 envisaged.) billion. Ministry of 50 .0 (R) Forestry - Trial and pilot industrial Project preparation underway. Agriculture (Bank) forest plantations; strengthening of forestry sector institutions, and National Forest Land and Timber Inventory. Ministry of 62.0 (R) Irrigation XVI - Primary and Appraisal report being Public Works (Bank) secondary canals, and sector reviewed. components on tertiary canals; operation and maintenance and general institution building. Ministry 10.0 Energy - Engineering loan to Project preparation underway. of Mines (Bank) prepare feasibility report on and Energy energy project. P.T. Pupuk 58 .O (R) National Fertilizer Distribution - Negotiations scheduled for end- Sriwijaya (Bank) to increase capacity to distribute November. (Co-financing is (PUSRI) output of new fertilizer plants. envisage~.) Ministry 53 .O (R) Irrigation XVII - Improvement of Appraisal report being reviewed. of Public (Bank) provincial operation and maintenance Works through training, equipment, facil- ·ities and transport; development of groundwater potential (East Java) through 180 production tubewells as well as large numbers of exploratory holes, test· wells and piezometer wells; rehabilitation works for about 50,000 ha. Ministry of 150.0 (R) Nucleus Estates VII - Assistance to Project preparation underway. Agriculture (Bank) smallholders through nucleus estates. (Co-financing is envisaged.) Ministry of 130 .0 (R) Nucleus Estates Sugar - Smallholder Project preparation underway. Agriculture (Bank) Development in South Kalimantan for 1,800 families and cultivation of about 3,000 ha of'sugarcane land; Nucleus Estate Development of about 2,000 ha of sugarcane area and about 200 ha of cane nurseries; Establishment of a sugar factory with capacity of 2-3,000 tons of cane per day. See page 1 for footnotes. - 33 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}) Lender '!:_/ Procurement!:._/ INDONESIA (Cont'd) Ministry of 90.0 Health I - The project would cover the Project preparation underway. Health (Bank) three provinces of South, Southeast and Central Sulawesi and would comprise components on infrastructure and staff development, drug supply and distri- bution, disease control programs, health management and administration, and project administration. Ministry of 200.0 (R) Power XII - The project covers mostly Appraisal mission scheduled Min:l.ng and (Bank) distribution requirements in Java and for early January. Energy some important outlying areas of Indonesia for the period 1983-87. Ministries of 100.0 (R) Irrigation XVIII - Preliminary works Project preparation underway. Public Works (Bank) for Jatigede, Kdungombo, and and Mines Batutegi multipurpose dams. and Energy Ministry of 90.0 Swamp Reclamation II - Development Project preparation underway. Public (Bank) of 40,000 ha of low-lying lands on Works the south Sumatra coast to settle about 14,000 families from Java/Bali; drainage, settlement, agricultural infrastructure. Ministry 50 .0 (N) Rural Credit II - Provision of rural Project preparation underway. of (Bank) credit through, and institutional Agriculture strengthening of, Bank Rakyat Indonesia. KOREA Ministry of 60.0 Agricultural Marketing I - Construc- Appraisal report being prepared. Agriculture (Bank) tion of urban wholesale markets for and Fishery fruits and vegetables and fishery products, with ice making and cold storage facilities. Ministry of 60 .o Small and Medium Machinery Industry - Project being prepared by Commerce and (Bank) To provide technical and financial the Government. Industry assistance to a selected group of small enterprises. Ministry of 50.0 Technological Development - Develop- Appraisal report being prepared. Science and (Bank) ment of policies and institutions Technology for advanced industrial techno- (MOST) logical development. Ministry of 90.0 (R) Water Supply I - To help improve water Negotiations substantially Construction (Bank) supply and sewage system in Daegu, completed. Masan, Changwon, Jimhae and Gwangju. Ministry of To be Ports III - To provide additional Project under preparation Transportation/ deter- capacity, especially container by Government and con- Korea Maritime mined handling capacity. sultants. (Co-financing and Port (Bank) is envisaged.) Authority See page 1 for footnotes. - 34 - Member Country, and Borrower..-or Amount & Stage of Process- Implementing . , Probable ing and Action on Agency }j : 1 , Lender '!:_/ Procurement 4/ INDONESIA {Cc;int'd) Ministry 250.0 (R) Structural Adjustment Loan - To Negotiations substantially of Finance/ (Bank) help the Government implement its completed. Economic structural adjustment policies Planning over the 1980/81 period. The Board policies in question are related to energy conservation, rationaliza- tion of industry, and resource mobilization. Ministry 100.0 Cement and Coal Distribution - To Project under preparation by of Trans- (Bank) finance part of the foreign exchange Government and consultants. portation needed to improve the efficiency of (Co-financing is envisaged.) coal and cement distribution in Korea. Ministry of· 125.0 Rural Roads - To finance part of Project under preparation by Home Affairs (Bank) the foreign exchange costs of, Government and consultants. constructing roads in rural areas. (Co-financing envisaged.) Ministry ofj:-:, 80.0 Jeonju Regional Development - Feasibility studies being Construction (Bank) To help further develop economic prepared by Government growth, employment and urban and consultants. infrastructure in the region's major urban areas of Jeonju, Gunsan and Iri. Citizens 40.0 (R) CNB II - To help meet the foreign Appraisal mission in the National (Bank) exchange cost of CNB lending program field. Bank (CNB) for 1983-84 and strengthen its insti~ tutional capabilities·: LAO PEOPLE'S DEMOCRATIC REPUBLIC Ministry of· 10.0 (R) Agricultural Rehabilitation and Project being reviewed Agriculture (IDA) Development IV - Strengthening of and start of negotiations agricultural support services. deferred. (Co-financing from r Total project cost estimated at IFAD and parallel financing l $23.6 million,' of which $17.4 mil- from UNDP being arranged.) lion is foreign exchange. Electricite 15.0 Nam Ngum Power Expansion - Third Negotiations tentatively scheduled du Laos (Ed.L) (IDA) stage expansion of Nam Ngum for 'for November. (Co-financing sale of electricity to Thailand; of $4.0 million with OPEC Fund arranged.) technical assistance. Total project cost estimated at $20 million with foreign exchange component of about $18.9 million • . "::.; \ .. Ministry of:''·: To be Small Scale Irrigation - Development Project to be prepared by AgricultureJ;' deter- of small and medium-size irrigation consultants financed out mined project covering a total area of of IDA Project Preparation (IDA) about 13,000 ha. Facility advance of $375,000. ··.t (Co-financing envisaged.) ·, ·1.' Ministry of To be Forestry Project - Forest production Project to be prepared by Agriculture• det:er- and plantation and support to FAO/CP program. mined· forest industries. (IDA) See page 1 ,;for footnotes. - 35 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency]:__/ Lender '!:._/ ~rocurement Y LAO REPUBLIC'S DEMOCRATIC REPUBLIC (Cont'd) Ministry of 18.0 Agricultural Training - Training Appraisal report being prepared, Agriculture (IDA) facilities and technical assistance (Co-financing with UNDP/FAO in support of agricultural develop- and SIDA being sought,) ment, Total project cost estimated at $20 million. MALAYSIA Ministry of 35.0 Education VI - Strengthening of Appraisal report being prepared. Education (Bank) vocati·onal and in-plant training. and Ministry of Labor and Manpower Ministry of 25,0 (R) State Rural Development I (Malacca Appraisal report being prepared, Agriculture (Bank) Agricultural Development) - The state rural development has now been renamed Malacca Agricultural Develop- ment. The project will cover rubber replanting and rehabilitation in the state of Malacca and construction of rural roads. Government 55,0 Industries I - Assistance for Project being prepared (Bank) manufacturing and institutional by Government, development. Government so.a Road Construction - Strengthening Project being prepared (Bank) the planning and construction by Government, capability of the road construction industry, technical assistance and training, as well as financing for road construction and maintenance. Ministry of 70,0 Western Johore - Integrated Develop- Project being prepared by Agriculture (Bank) ment - Construction of farm roads Government. and drainage facilities, and provision of agricultural support services. National 85.0 Rural Electrification I - Expansion Appraisal report being prepared. Electricity (Bank) of the rural power network-with Board mini-hydro schemes. Total cost is estimated to be $163 million. Government 35.0 (R) Kedah Agricultural Development - Project being prepared by (Bank) Rubber replanting, irrigation Government. ·and drainage, rural roads, live- stock and fishery development and agricultural support services, PAPUA NEW GUINEA Department 15.0 Agricultural Credit II - A Approved by the Executive Directors of Primary (IDA) nationwide agricultural project on May 21. Industry/PNG to support agricultural produc- Development tion and processing through-credit Procurement: Retroactive financing Bank and technical assistance, It would of $1,5 million for undertaking also include a pilot T&V extension expansion of staff and facilities, component and provincial data processing subloans and making collection and analysis. field management arrangements from June 1, 1980, Department 5.0 (R) Petroleum Technical Assistance - Appraisal mission scheduled for of Minerals (IDA) Technical assistance for promotion December, and of petroleum exploration. Energy See page l for footnotes, - 36 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency y Lender'!:._/ Procurement!:._/ PAPUA ._NEW GUINEA (Cont'd) Department 6. 0 (R) Enga Provincial Development - Negotiations scheduled for mid- of (Bank) Integrated rural development in December. Provincial 2.0 Enga province. Affairs, (IDA) National Planning Office PHILIPPINES Development 60 .0 (R) DBP - Commercial Tree Crops Production Appraisal mission scheduled Bank of the (Bank) and Processing - Agricultural credit for early November. Philippines for tree crop production, processing (DBP) and marketing. Ministry 19.0 National Fisheries Development - Insti- Appraisal report being prepared. of Natural (Bank) tutional support and infrastructure Resources for fisheries sector, including pro- grams for poor municipal fishermen. To be so.a (R) Urban IV (Regional Cities) - Invest- Project being prepared determined (Bank) ments in 4 cities including selected by Government. primary infrastructure, employment generation and industrial estates, transport, municipal services and facilities, and sanitation and shelter to support a program of spurring regional urban economic development. To be 140.0 (R) Small and Medium Industries III - Appraisal mission in the field. deter- (Bank) To provide funds for relending to (Co-financing may be sought.) mined small and medium industry, and supporting technical assistance to specific subsectors. Ministry 160.0 (R) Textile Sector - Restructuring Appraisal report being prepared. of Industry (Bank) of the textile sector. (Co-financing may be sought.) Ministry 50.0 Rural Development IV (Land Project being prepared of Agrarian (Bank) Settlement II) - Further assis- by Government. Reform tance for planning and execution of Government's land settlement program. National 60.0 Rural Electrification II - To finance Project being prepared Electrification (Bank) expansion of Government's on-going by Government. Administration ·rural electrification program. National 60.0 (R) Communa.l Irrigation - To finance Appraisal report being Irrigation (Bank) a part of the Government's communal prepared. Administration irrigation program covering about (NIA) 20,000-30,000 ha. Ministry of 175.0 Road Transport - Construction and Project being prepared Public Highways (Bank) improvement of rural roads; nationwide by Government. bridge program on national roads; and maintenance and rehabilitation of national roads. Land Bank 50.0 Small Farmer Development (Land Bank Project being prepared of the (Bank) II) - Further credit, support services by LBP. Philippines and minor infrastructure assistance (LBP) for land reform beneficiaries. See page 1 for footnotes. - 37 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency "J:_/ Lender 'l:_/ Procurement !:./ PHILIPPINES (Cont'd) Ministry 60,0 Rainfed Agricultural Development Project being prepared ot' (Bank) II (Mindanao) - Support services by Government. Agriculture and infrastructure to promote diversified rainfed and upland crop/livestock systems in Mindanao region. To be 100.0 (R) Geothermal Exploration - To assess. Pre-appraisal mission deter- (Bank) geothermal resources, assist in scheduled for late mined developing one field, and provide November/early December. institutional strengthening. National 35,0 (R) Education VIII (Skills Training) - To Appraisal report being prepared, Manpower (Bank) support Government's industrial devel- and Youth opment strategy with emphasis on re- Council gional diversification and training (NMYC) needs of small-and medium-scale industries. To be so.a (R) Region VII Agro-Forestry - Integrated Project being prepared deter- (Bank) program of agro-forestry, agrarian by Government. Bank Project mined reform, infrastructure and research Preparation Facility advance in Central Visayas. of $500,000 approved to finance I consultancy services, incremen- tal costs in connection with recruitment of staff, and vehicles and equipment required to assist in the preparation. National 8,0 (R) Urban Engineering - To finance pre- Negotiations substantially Economic and (Bank) liminary and detailed engineering completed. Development for the preparation of two urban Authority projects (Urban IV and VI). Ministry of so.a Rural Water Supply - To help improve Project being prepared by Public Works (Bank) water supply and sanitation in Government. and selected rural areas using low-cost Highways schemes. To be 10.0 (N) Coal Exploration - Basic exploration Project being prepared deter- (Bank) for"two coal-bearing areas; establish- by Government. mined ment of a coal testing center, and detailed exploration for one or two coal deposits. SOLOMON ISLANDS Government of 6.0 (R) Primary Education (Multisector Credit) - Appraisal report being reviewed. Solomon Islands (IDA) Multisector credit with emphasis on primary education. A small rural Procurement: Retroactive financing transport component likely to be not to exceed $300,000 is being included. Total project cost considered for consultant services estimated at $8 million. and for force account construction of roads. Government 2.0 . (R) Lungga Hydroelectric Power Project - Project dropped from FY82 lending of Solomon (IDA) Total project cost estimated at program. Total project cost estimate Islands, $55 million. now exceeeding $65 million, Govern- Electricity ment looking at alternative designs. Authority Project will most probably be postponed until FY83. See page 1 for footnotes. - 38 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency l_/ Lender'!:__/ Procurement~/ THAILAND Ministry of 65.0 (R) Education VI - Strengthening of Appraisal report being Education (Bank) diversified secondary ed~cation and prepared. of Ministry of Education, Planning and Management. Total project cost estimated at $142 million. Ministry of 80.0 Irrigation XIII (Medium Scale/Nam Mun) Project being prepared by Agriculture (Bank) - Slice of Royal Irrigation Depart- Royal Irrigation Department, and Cooperatives ment's irrigation development program, assisted by consultants. including construction/rehabilitation (Co-financing from KfW of medium-scale irrigation systems and being explored.) construction of storage dams on head- waters of Mun River and of irrigation systems for about 25,000 hectares. Ministry of 30.0 Forestry I - Forest protection, Project scope being revised. Agriculture (Bank) wood lot development, industrial Government is undertaking and Cooperatives plantations, forest villages and preparation. (Co-financing research, extension and training for with Australia being explored.) Royal Forestry Department. (RUBBER 145.0 (R) Second Tree Crops - Second phase Negotiations in progress. (Co- REPLANTING (Bank) of rubber replanting project, and financing of about $25.0 million AID FUND initiation of rubber new planting with CDC being arranged.) BOARD) and coconut development programs. Total cost estimated at $437.0 mil- lion, of which $173.0 million in foreign exchange. (TELEPHONE 140.0 (R) Fourth Telecommunications Project - Appraisal mission in the field. ORGANIZATION (Bank) Expansion of telephone facilities (Co-financing with Japan and Sweden OF THAILAND) particularly in rural and provincial and private sources being explored.) areas. Total cost estimated at $545 million with a foreign exchange com- ponent of $320 million. r Ministry of 150.0 Rural Roads - Construction of rural Project preparation underway. I· Communications (Bank) roads countrywide. (Co-financing being explored.) Ministry of 17 .o (R) Land Reform Area Development - Land Negotiations scheduled for Agriculture (Bank) development, titling, irrigation, January. (Co-financing with and Cooper- reforestation, infrastructure and Australia and UNDP being explored.) atives other services in settlement areas. Total project cost estimated at $28.2 million with a foreign exchange component of about $6.9 million. (PETROLEUM 100.0 (R) Energy I - Natural gas processing Appraisal mission scheduled AUTHORITY (Bank) and liquified petroleum gas distri- for early November. (Co- OF THAILAND bution; assistance to exploration/ financing from OPEC Fund and (PTT)) delineation drilling and institution- CDC expected; additional financing building measures. Total cost from export credit agencies and estimated at $450 million, with a commercial banks being explored.) foreign exchange component of $330 million. Ministry of 75.0 (R) Population/Health II - Expansion of Identification mission recently Public Health (Bank) the Government's population, health returned. Government exploring and nutrition activities through the financing requirements for pos- construction of rural health facili- sible project in later years ties, provision of equipment, materials of current 5-year plan. (Co- and supplies and training of staff. financing likely.) See pager for footnotes. - 39 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender 'le_/ Procurement !i__/ THAILAND (Cont'd) (PETROLEUM To be Energy II - Retrofitting of industries Project preparation underway, AUTHORITY deter- and institution-building measures OF THAILAND mined to encourage energy conservation or (PTT)) (Bank) substitution of fuels. (ELECTRICITY 140,0 (R) Upper Quae Yai Hydroelectric - Appraisal mission scheduled GENERATING (Bank) ·580 MW hydro station, Total cost for November, (Export AUTHORITY estimated at $615 million of which credit and private OF THAILAND $275 million in foreign exchange. co-financing being explored,) (EGAT)) (STATE 115.0 (R) Railways VI - To support SRT's rail Appraisal mission in the RAILWAY (Bank) service expansion program in the field, (Co-financing OF THAILAND FY82-86 period. Total project with commercial banks and (SRT)) cost estimated at $450 million export credit agencies being with foreign exchange component explored,) of $250 million. (PROVINCIAL 130.0 Power Sector II - To support 2-3 Appraisal mission tentatively ELECTRICITY (Bank) year time slice of PEA's investment scheduled for May 1982, (Co- AUTHORITY program. financing to be explored with (PEA)) Saudi Fund, OPEC Special Fund and private sources.) (BANK FOR 73,0 Agriculture Credit II - Further Appraisal mission tentatively AGRICULTURE (Bank) support to BAAC to help strengthen scheduled for January 1982, AND AGRICUL- the cooperative system as a vehicle TURAL COOPERA- for channeling credit and other TIVES (BAAC)) services to small farmers. National 10.0 Eastern Seaboard Engineering - Project preparation underway. Economic and (Bank) Study and design of transportation Social Develop- and other infrastructure projects ment Board required to support industrial and (NESDB)) town development in Eastern Seaboard region." Ministry of 150.0 Structural Adjustment Loan - To help Appraisal report being prepared, Finance (Bank) the Government implement its structural adjustment policies related to agriculture, industry, energy, fiscal policy and institutional reform, Ministry 30,0 (N) Land Titling and Registration - Identification mission scheduled of (Bank) Acceleration of cadastral surveying for November, Interior and issuance of land titles in ·rural areas, and strengthening of land registration and adminis- tration system. VIET NAM Ministry of To be Coal Expansion I - Development of a Project processing in Electricity deter- coal mine in Quang Ninh Province, abeyance. and Coal mined Total project costs tentatively (IDA) estimated at $112 million, Viet Nam To be Industrial Rehabilitation Project - Project processing in Bank for deter- Rehabilitation and expansion of abeyance, Industry mined textile, pulp and paper, and food (IDA) processing industries, Total proj- ect cost tentatively estimated at $50 million, See page 1 for footnotes, - 40 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency 1__/ Lender 2/ Procurement 4/ ---- VIET NAM (Cont'd) Ministry To be Nghe Tinh Agricultural Rehabilitation Project processing in of Water deter- and Development - Repair of flood abeyance. Conservancy mined damage on irrigation and drainage (IDA) works in northern part of Viet Nam heavily damaged by typhoons and floods in 1978, and construction of salinity and flood control works. Total project cost estimated at $128 million. Ministry of To be Transport Rehabilitation - Rehabili- Project processing in Transport deter- tation of port, roads and railways abeyance. mined facilities and inland waterways. (IDA) Ministry To be Agricultural rehabilitation and Project processing in of Water deter- development in provinces with high abeyance. Conservancy mined food production potential. (IDA) See page 1 for footnotes. - 41 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency l_/ Lender'!:_/ Procurement':_/ IV. SOUTH ASIA BANGLADESH Ministry of Up to Inland Water Transport III - Project preparation underway. Ports, Ship- 35.0 Components not yet identified. ping and (IDA) Inland Water Transport Telecommuni- About (R) Telecommunications III - Next Negotiations tentatively scheduled cat~ons Board 44.0 phase of Government's develop- for December. (Co-financing, (IDA) ment program. including Germany and Japan, envisaged.) Ministry About Road Maintenance - Strengthening Project preparation underway. of Roads, 40.0 of maintenance organization through Highways (IDA) training, provision of equipment and Road and materials and technical assist- Transport ance, possibly including selective rehabilitation of existing primary roads. Ministry of About Business Management Training - Assis- Appraisal report being prepared. Education and 10.0 tance to Institute of Public Adminis- Ministry of (IDA) tration and Dacca University for Industries strengthening management training and education. Seed About Seeds II. Construction of facili- Project processing suspended Corporation 14.0 ties for seed production, processing, pending resolution of issues still (to be (IDA) distribution, storage, research and outstanding. established) technical assistance. Ministry of About (R) Extension and Research II. To Negotiations tentatively scheduled Agriculture 27 .o support extension and· research for January. (IDA) on production of rice and wheat. Chittagong About (R) Chittagong Fertilizer - Establish- Negotiations scheduled for late Urea Fertilizer, 15.0 ment of an integrated ammonia/urea November. (ADB is organizing- Ltd. (IDA) fertilizer plant at Chittagong with co-financing arrangements under a rated capacity of 1,700 metric tons which seven lenders would provide of urea per day, using domestic a total of about $292 million for natural gas as feedstock. the project.) Chittagong About (R) Ports I - Possibly to include Negotiations tentatively scheduled Port Authority 60.0 construction of multipurpose berths, for March. (CPA) (IDA) dredging, cargo handling, equipment, improved lighting, technical assistance and training. Bangladesh About (R) Textile Industry - Balancing, Negotiations .scheduled for Textile 30.0 modernization and replacement, mid-November. Manufacturing (IDA) and imported raw materials. Corporation Bangladesh About (R) Sugar - May include mill rehabili- Appraisal report being prepared. Sugar & Food 20.0 tation, improvement in mill farms Corporation (IDA) and transportation in mill zones, (BSFIC) strengthening extension and research, and a pilot gur improve- ment program. Dacca Water About Dacca WASA III Extensions to Project being prepared by WASA, and Sewerage 25.0 water supply and sewerage assisted by consultants. Authority (IDA) systems. (WASA) Water Devel- About (R) Drainage and Flood Control II - Credit approved by the Executive opment Board 27.0 Includes several small-scale Directors on October 27. (WDB) (IDA) drainage and flood control subprojects. See page 1 for footnotes. - 42 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency];_/ Lender !:./ Procurement!:_/ BANGLADESH (Cont'd) Planning 100,0 (R) Imports Program X - Provision of Negotiations substantially Commission (IDA) foreign exchange for procurement completed, Board presentation of raw materials and spare parts scheduled for December 22, required to improve utilization of existing capacity, Power About Power II - Expansion of Ashuganj Appraisal report under prepar- Development 80,0 Plant to provide additional ation, Board (IDA) generating capacity. Water About (R) WDB Sector Credit - Small irrigation/ Preparation mission scheduled Development 50,0 drainage/flood control projects, for January, Board (WDB) (IDA) Water About Barisal Patuakhali - Irrigation, FAO is assisting WDB in Development 60,0 drainage and flood control works project preparation, Board (WDB) (IDA) in Barisal and Patuakhali districts in southwest Bangladesh, Water & About (R) District Town Water Supply - Preappraisal mission scheduled Sewerage 25,0 Water supply systems for for March, Authorities (IDA) Khulna and Rajshahi, (to be established) Petrobangla About Gas and oil exploration - To be Project preparation report by 40,0 identified, Government underway, (IDA) Ministry of About (R) Rural Development II - Extension Subsector report under Local 30.0 of Integrated Rural Development preparation, Government, (IDA) Program (IRDP), Rural Development and Cooperatives Rural About Power Ill - Rural Electrification, Appraisal report being prepared, Electrification 40,0 Board (REB) (IDA) Establishment About (R) Public Administration - Expansion Appraisal mission tentatively Division of 30,0 of the public administration scheduled for January. the Cabinet (IDA) training complex. Secretariat National 19,0 (R) Agricultural Training II - Includes Negotiations tentatively scheduled Committee (IDA) ·(a) facilities and equipment for for January, on Rural agriculture extension training Training institutes and a regional academy and of rural development; (b) experi- Ministry mental facilities to try new modes of of extension in trial areas; Agriculture (c) in-service training for present extension staff; and (d) technical assistance. Ministry About (R) Supplementary Credit - First Highway Awaiting GOB/Consultants' design of Roads, 6,0 Project - Strengthening and remedial report, Railways, (IDA) work on the 17-1/2 miles Feni Bypass Highways constructed under Highway Cr. 408-BD, and Road Transport Water Devel- About Drainage and Flood Control III - Awaiting selection opment Board 45,0 Expected to include several small- of consultants, (WDB) (IDA) scale drainage and flood control subprojects, Ministry of About (R) Foodgrain Storage III - Emphasizing Preappraisal mission sch~duled Food 45,0 investments to strengthen inland for mid-November, (IDA) storage system for domestic procure- ment, See page 1 for footnotes, - 43 - Member Country, and Borrower or Amount & Stage of Process~ Implementing Probable ing and Action on Agency Y Lender '!:_/ Procurement~/ BANGLADESH (Cont'd) Fisheries About Fisheries II Project identification Department 20.0 underway. · (IDA) Bangladesh About (R) Phosphate Gypsum - To manufacture Study by consultants and Chemical 25.0 cement clinker and recover sulphur IDA underway. Industries (IDA) dioxide. Gypsum washing facilities, Corporation calcination and storage equipment, cement kiln and ancillary facilities will be included. Ministry of About Rural Roads & Marketing - Project being identified Local Govern- 30.0 Rehabilitation of rural roads, by FAO/CP. ment, Rural (IDA) rural markets and construction Development, and of small-scale storage. Cooperatives Ministry of About (R) Deep Tubewells I I - Nationwide Appraisal mission in the Agriculture 50.0 follow-up to the successful field. (IDA) Northwest Region Tubewells Project (Credit 341BD). Ministry of About Agricultural Research II - To Project preparation underway. Agriculture 30.0 support and develop agricultural (IDA) research over a five year period. Ministry of About (R) Secondary Roads - To rehabilitate Preparation mission scheduled Roads, 35.0 and/or build about 200 miles of for January. Highways and (IDA) all-weather roads in foodgrain. Road Transport surplus areas. Planning About Imports Program XI - Provision of Appraisal mission tentatively Commission 90.0 foreign exchange for procurement scheduled for April. (IDA) of raw materials and spare parts required to improve utilization of existing capacity. Bangladesh About Agricultural Credit II - To support Project preparation underway. Bank 60.0 further reform of agricultural credit (IDA) system, including provision of credit to farmers for on-farm investments. Bangladesh About (N) Machine Tool Management Contract, Project preparation underway. Steel and 25.0 balancing equipment, and imported Engineering (IDA) raw materials. Corporation and Bangladesh Machine Tool Factory BURMA Ministry of To be (R). Fuelwood Supply - First phase of Bank mission in the field to Agriculture deter- ten-year plantation program to confirm Government's interest and Forests mined supply fuelwood and small timber in this project. (IDA) for domestic use, particularly for rural areas. Ministry of Up to Fisheries - Investment for fisheries Appraisal mission in the field. Agriculture 22.0 development in the Irrawaddy Delta, and Forests (IDA) which includes a minor fishing harbor, shore facilities, fishing vessels and a net-making plant. Ministry of Up to Power I - Power transmission project Appraisal report being prepared. Industry II 70.0 to interconnect the power supply (IDA) system. See page l for footnotes. - 44 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender'!:_/ Procurement!!_/ BURMA (Cont'd) Ministry of To be Arakan Pulp and Paper - To construct Project preparation under way Industry II deter- a pulp and paper mill with a capacity by Government, with assistance mined of 100 tons per day of printing and from consultants financed (IDA) writing paper produced from a mixture by an advance of $150,000 from of bamboo and indigenous hardwoods, the IDA Project Preparation The project also includes associated Facility, infrastructure facilities, Ministry of To be (R) Construction Industry (Formerly, Road Appraisal mission scheduled Construction deter- Rehabilitation and Road Transport for November/December. mined Project.) - A First Phase to (IDA) strengthen the capacity of road rehabilitation and maintenance by providing equipment, materials, spare parts and technical assistance and training, Ministry To be Tubewells I - To increase agriculture Project being prepared of deter- productivity in the Central Dry Zone, by Government with consultants Agriculture mined through installation of tubewells financed by UNDP and IDA, and (IDA) and provision of agriculture support Forests facilities, Ministry of Up to Wood Industries II - To further Preparation mission scheduled Agriculture 50,0 improve the supply of wood for December. and Forests (IDA) products to the domestic market, Ministry of Up to (R) Rubber Rehabilitation II - New Preparation mission in the field, Agriculture 15.0 plantings and replantings in and Forests (IDA) about 10,000 acres, expand reprocessing facilities, staff training and technical assistance, Ministry of To be · (R) Tank Irrigation - Increase crop Appraisal mission in the field, Agriculture deter- production and farm incomes with and Forests mined development of tank irrigation (IDA) schemes in the Magwe Division and Man State, INDIA Krishak Bharati 400.0 (R) Hazira Fertilizer - Construction of Credit signed on October 28, Cooperative (IDA) two ammonia units of 1,350 tons-per- Ltd, . day each and four urea units of 1,100 (KRIBHCO) tons-per-day each, Estimated project cost $1,279 million, Indian 285,0 Railway Electrification: Support Appraisal report being prepared, Railways (IDA) of IR's ongoing electrification (IR) program to modernize railway operations and improve efficiency. Government of 25.0 (R) Kanpur Urban Development - Program Credit approved by the Executive Uttar Pradesh (IDA) of shelter and infrastructure Directors on October 27, investment at Kanpur in Uttar Pradesh State, Procurement: Retroactive financing of $0,5 million, Government of 220,0 Madhya Pradesh Major Irrigation - Credit approved by the Executive Madhya Pradesh (IDA) Irrigation and command area Directors on September 15, Signing development in major irrigation awaiting availability of IDA funds. systems in Madhya Pradesh State. Government of 100.0 Commercial Forestry - Afforestation Timing of appraisal mission to be Madhya Pradesh (IDA) of unused land and degraded forests decided upon receipt of Government in Madhya Pradesh. of India's decision on project scope. National Thermal 400.0 Power - Development of the second Credit approved by the Executive Power Corpora- (IDA) phase of Korba Thermal Power Devel- Directors on July 7, Signing tion (NTPC) opment in Madhya Pradesh State. awaiting availability of IDA funds, Government 29.0 (R) West Bengal Social Forestry Project - Approved by the Executive Directors of West (IDA) Afforestation of unused land and on October 6. Signing awaiting Bengal degraded forests, availability of IDA funds, Procurement: Retroactive financing of up to $1,0 million, To be 30.0 Rainfed Agriculture Project - Devel- Project preparation determined (IDA) opment of rainfed agriculture system underway. in selected State(s), See page 1 for footnotes. - 45 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}:_/ Lender 2/ Procurement~/ ---- INDIA (Cont'd) To be 30.0 Erosion and Flood Control - Installa- Project preparation underway. determined (IDA) tion of erosion and flood control systems in the selected States. Government 250.0- Madhya Pradesh Pulp and Paper Project preparation underway. of Madhya 300.0 (formerly Forestry Industry) - Pradesh (IDA) Development of forestry industry in Madhya Pradesh State. Government 70.0 Upper Ganga Irrigation - Modernization Project preparation of Uttar (IDA) of irrigation systems in Uttar Pradesh underway. Pradesh State. National 300.0 (R) Power - Development of the second Negotiations scheduled for Thermal (IDA) phase of the Ramagundam Thermal Power mid-November. Power Development in Andhra Pradesh State. Corporation (NTPC) Ministry of 250.0 Nhava Sheva Port - Construction of a Project preparation Shipping and (IDA) new port facility to relieve serious underway. Transport/ overcrowding and delays at Bombay Bombay Port Port. Agricultural 350.0 (R) Agricultural Refinance and Develop- Negotiations scheduled for mid- Refinance ?,nd (IDA) ment Corporation (ARDC) Credit IV - November. Development Financing of portion of ARDC's lend- Corporation ing program for on-farm investments. Government 76.0 (R) Gujarat Water Supply and Sewerage Appraisal report being prepared. of Gujarat (IDA) Project; Implementation of 13 water supply and 5 sewerage sub-projects, Procurement: _Retroactive financing as well as a low-cost sanitation of up to $2.5 million will be component, for the ·state of Gujarat. proposed for consultancy services. Oil and 250.0 (R) Oil/Gas Development - Assistance Appraisal mission in the field. Natural Gas (Bank) for development of South Bassein . Commission offshore gas field • Cement 251.0 (R) Cement Expansion Project - Project has been reconsidered by Corpo_ration (Bank) Increase of 3.2 million tons the Government cf India. ·Conse- of India per year of cement capacity quently, further reporting of by construction of one new this project will be discontinued. plant and expansion of two existing ones. To be 300.0 Petrochemicals - Production of Timing of appraisal to be decided determined (IDA) petrochemicals based on Bombay High after GOI approval of project details. natural gas and/or production of basic aromatics and selected derivatives. Government 126.0 Kallada Irrigation - Irrigation Appraisal report being revised. of Kerala (IDA) development in South Kerala. Oil and 150.0- (R) Krishna - Godavari: petroleum Appraisal mission in the field. Natural 200.0 exploration assistance. Gas (Bank) Commission (ONGC) Rural 300.0 (R) Third Rural Electrification Negotiations postponed at the Electrification (IDA) Corporation - A~sistance for request of Government of India; Corporation construction and reinforcement now tentatively scheduled for (REC) of rural electricity distribution December. network. See page 1 for footnotes. ''·.., • •• •~?. - 46 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency"}:__/ Lender'!:_/ Procurement 4/ INDIA (Cont'd) Indian 415.0 (R) Railway Modernization and Maintenance Appraisal mission's findings Railways (IDA) Project II - Construction and equip- being discussed with Government. (IR) ment of component building workshop; import of components and of 20 proto- Procurement: Retroactive type electric locomotives. financing of up to $1.0 million being proposed. ICICI 150.0 (R) ICICI XIV - Assistance to Industrial Loan approved by the Executive (Bank) Credit and Investment Corporation Directors on October 6 and of India (ICICI) industrial sub- signed on October 8. borrowers. Government 50.0 (R) Tamil Nadu Water Supply and Sanitation Preappraisal mission in the of Tamil (IDA) Project: Water supply for three field. Nadu large towns, and 60 middle-sized towns, and low-cost sanitation for 15 small towns. Ministry of so.a Fertilizer Distribution Project - Project preparation underway. Agriculture (Bank) Development of an integrated system 50.0 for the distribution of imported/ (IDA) domestically-manufactured fertilizers to main distributing (nodal) points. Government of 52.0 (R) Chambal (Madhya Pradesh) Irrigation Negotiations scheduled for Madhya Pradesh (IDA) II - Irrigation and command area mid-November. development in the Chambal River valley in Madhya Pradesh. Government of so.a (R) Chambal (Rajasthan) Irrigation II Appraisal mission in the field. Rajasthan (IDA) Project - Irrigation and command area development in the Chambal River valley in Rajasthan. Government 250.0 (R) Upper Indravati Hy4ro-Electric Appraisal mission tentatively of Orissa (Bank) Project - Construction of a 600 scheduled for January. MW hydro-electric generating station together with associated dams, channels and tunnels in Orissa State. To be 150.0 Fifth Power Transmission Project - Appraisal mission tentatively determined (IDA) Construction of a network of 400 scheduled for January 1982. KV transmission lines and associ- ated sub-stations in several states, spanning four Regions. Five Public 200.0 ·Oil Refinery Conversion - Addition Appraisal report being prepared. Sector Oil (Bank) of fluid catalytic cracker (FCC) Companies units, energy efficiency and Procurement: Retroactive financing pollution control measures to of up to $20.0 million will be refineries in Bombay, Vizag and proposed. Madras. Government 100.0 (R) Subernarekha Irrigation (Bihar) - Appraisal mission tentatively of Bihar (IDA) Irrigation and command area scheduled for November/December. development of Subernarekha Project in Bihar. Government 45.0 (R) Subernarekha Irrigation (Orissa) - Appraisal mission tentatively of Orissa (IDA) Irrigation and command area develop- scheduled for November/December. ment of Subernarekha Project in Orissa State. Government of 75.0 UP Tubewells II - Construction of Project preparation underway. Uttar Pradesh (IDA) approximately 5,000 tubewells for irrigation in Uttar Pradesh. Government 6.0 (R) Andhra Pradesh Extension - Appraisal report being prepared. of Andhra (IDA) Improvements to the agricultural Pradesh extension system in the State. Procurement: Retroactive financing of up to $600,000 will be proposed. See page 1 for footnotes. - 47 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency !J Lender 2/ Procurement!:._/ ---- INDIA (Cont'd) Government of 40.0 Haldia Water Supply and Sewerage Project preparation underway. West Bengal (IDA) Project - Construction of 225 million liters/day treatment plant, 4 pumping stations and a 90 km long water transmission main to serve the needs of the Haldia Development Authority, plus 2 towns and rural communities en route. Government 50.0 Bihar Water Supply - Provision Project preparation underway. of Bihar (IDA) of piped water supply to about 8 towns and surrounding villages in the State of Bihar. Government of 25.0 Madhya Pradesh Urban Development Project preparation underway. Madhya Pradesh (IDA) Project - Shelter and infrastructure investments in several medium-sized cities in the State of Madhya Pradesh. Government 30.0 (R) Jammu-Kashmir and Haryana Social Appraisal mission in the field. of Jammu-Kashmir (IDA) Forestry Project - Afforestation and Haryana of wasteland and degraded forests. Government of 50.0 Third Calcutta Urban Development Project preparation underway. West Bengal (IDA) Project - Expansion and improvement of urban service systems and institutional capabilities in the Calcutta Metropolitan District. MALDIVES Ministry of 6.0 Second fisheries - Local storage Project components being Fisheries (IDA) and collection facilities for land- identified. based fish export operations; technical assistance for fish survey, and testing of new technology. NEPAL Department of Up to (R) Cottage Industries - Promotion of Board presentation scheduled Cottage and 6.5 cottage and small-scale industries. for November 24. (Co-financing Village (IDA) arrangements with UNDP to be Industries completed.) Ministry of Up to (R) Marsyangdi Hydroelectric - Hydro- Project preparation under- Water Resources 75.0 electric power station in Central way. (Co-financing with (IDA) Nepal with about 50 MW capacity, Federal Republic of Germany ·and transmission to central grid. being arranged. Additional co-financing required.) Ministry of 14.3 (R) Education II - Expansion of programs Negotiations substantially Education (IDA) for technical education in engineer- completed. Board presentation ing and agriculture. tentatively scheduled for December 22. Ministry To be Cash Crops - Sector line of credit Project preparation of Food deter- to develop sugar, tea, etc., underway. and mined with funds to be channelled through Agriculture (IDA) Agricultural Development Bank in Nepal (ADBN), which would appraise the subprojects. Ministry of Up to (R) Transport III - Completion of the Project being prepared Works and 35.0 East/West Highway (tentative); by consultants financed Transport (IDA) road maintenance; and assistance by UNDP. to construction industry. Nepal Up tu (R) Telecommunications IV - Follow-up Project components being Telecom- 35.0 for expansion of local and inter- identified. munications (IDA) national servic~s. Corporation See page 1 for footnotes. - 48 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency y Lender 'jj Procurement !i._/ PAKISTAN Karachi so.a (R) Expansion of Bulk Water Supply Appraisal mission in the field. Development (IDA) System and improvement of sewer- Authority age system in Karachi. Government 32.0 (R) Grain Storage III - Improvement of Credit signed on October 21. of Pakistan (IDA) foodgrain handling and storage. Ministry of so.a Irrigation Systems Rehabilitation - Appraisal report being prepared. Water and (IDA) Program to improve institutional Power and financial capability of provincial irrigation departments. Telegraph and 40.0 . Telecommunications IV - To support Negotiations unscheduled, pending Telephone (IDA) Telegraph and Telephone Development information from Government. Department Investment Program for period 1981-1984. Water and Power 50.0 Irrigation/Drainage IV Project - Project under preparation by Development (IDA) Includes reclamation of saline/ Government. Authority alkaline land and improvement of (WAPDA) extension services. Oil & Gas 80.0 Oil and Gas 11 - Development of Preappraisal mission Development (IDA) Dhodak field and technical assis- scheduled for December. Corporation tance, training and studies. An IDA Project Preparation Facility advance of $210,000 was approved to help prepare a field development study. Lahore 22.0 Lahore Urban Development Project - Appraisal report being Development (IDA) Including upgrading of low-income prepared. Authority areas, sites and services, solid waste disposal, and improvements to urban transportation system. Industrial 30.0 (R) Industrial Development Bank of Board presentation on Development (IDA) Pakistan - Second project for November 3. Bank of onlending to industry. Pakistan (IDBP) Pakistan 50.0 (R) Railways XI - For modernizing and Appraisal mission in the field. Railway (IDA) increasing efficiency of railways. Board Sui 60.0 Expansion of capacity of SNGPL's Timing of appraisal mission Northern (IDA) gas transmission system and asso- dependent upon results of gas Gas ciated facilities. study, being undertaken by Pipelines consultants. Ltd. (SNGPL) Government 31.0 (R) Fertilizer Industry IV (Rehabili- Appraisal mission in the field. of (IDA) tation) - Financial and technical Pakistan assistance to increase production capacity and storage facilities. Government Up to Baluchistan Agriculture Development - Appraisal report being prepared. of 20.0 including perennial and flood irri- Pakistan (IDA) gation schemes, groundwater recharge and improvement of range and live- stock production. Government To be (R) Structural Adjustment Loan - Appraisal mission in the field. of Pakistan deter- To support economic adjustment mined program of Government by providing foreign exchange for import of raw materials and intermediate goods. See page 1 for footnotes. - 49 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable I I ing and Action on Agency ];_/ Lender'!:__/ Project'}_/ Procurement'±_/ PAKISTAN (Cont'd) Government Up to Population - To assist the The Bank and the Government of Pakistan 30.0 Government of Pakistan in imple- of Pakistan have agreed on an (IDA) menting its popu]ation program. advance of $290,000 from the Priority will bejgiven to IDA Project Preparation Facility intensifying ser 1ices and for the completion of project preparation work, for the 1 information, educ ation and communications. i training of key personnel and preparation of an operational plan for the project areas. SRI LANKA Ministry of 90.0 (R) Mahaweli Ganga De~elopment III - Loan signing on November 5. Mahaweli (IDA) Construction of p'ortion of Right (Japan and Kuwait Fund have Development Bank Transbasin c:anal; and down- pledged to co-finance stream irrigatiod works and social $53.2 million and $45 infrastructure for System C. million, respectively.) Procurement: Retroactive financing of about $10.0 million approved for initial work on the Right Bank Transbasin Canal. Award of contract for con- struction of the canal has been made by the Government. Ministry Up to (R) Second Tree Crops! Rehabilitation Appraisal report bei~g of State 35.0 (Tea) - Project ·is expec.ted t9 prepared. Plantation (IDA) comprise rehabilitation.of tea Corporation estates and factories over about Procurement: Retroactive 17,000 ha, including infilling financing of about $1.2 and replanting, timber planting, million recommended. labor housing, improved labor, water supply and health services, and factory rehabilitation. The 1 project will also have a diversi- 1 fication componen;. Ministry Up to (R) ForeStry - Suppor~ to Government Project preparation report of Lands 15.0 Scheme to establish 75,000 acres of finalized. and Land (IDA) industrial and fuelwood plantations Development over five years; strengthening . forestry sector i~stitutions and formulation of a forestry master plan. I Ministry Up to (R) Mahaweli Power Transmission - To Negotiations scheduled for mid- of Power 36.0 'transmit power ge~erated from proposed November. (Co-financing with and Energy (IDA) hydroelectric stations in Mahaweli OPEC Fund of $11.0 million being Program. Project:components include arranged.) 220 kv transmission line, associated switching and grid substation facilities, and technical assistance. National 30.0 (R) Small and Medium industries I I - Credit approved by the Executive Development (IDA) Replenishment of fund established Directors on October 13. Bank in first project for onlending to private sector sm~ll and medium industries. National Up to (R) Industrial Invest~ent Credit - A Appraisal mission scheduled Development 20.0 credit line to NDB and DFCC for for end-November. Bank (NDB)/ (IDA) onlending to private and public Development sector projects. I . Finance Corporations (DFCC) Ministry of To be (N) Diesel Power Generation - About Designs and specifications Power and deter- 80 MW total capacity; 10 MW under discussion with the Energy; Ceylon mined generating capacity for 8 Government. (Co-financing Electricity (IDA) generating units. . to be arranged.) Board See page 1 for footnot.es. - 50 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency y Lender'!:_/ Procurement'!_/ V. EUROPE, MIDDLE EAST AN NORTH AFRICA AFGHANISTAN Progress reports on the Afghanistan program are being discontinued until circumstances permit renewed project preplration. ALGERIA Ministry of 100.0 Telecommunications - roject would Project processing suspended, pending Posts and (Bank) consist of elements included in the resolution of issues still outstanding. Telecom.mun!- first three years of tlhe telecommuni- cations cations investment plJn. To be To be (R) Urban Development - Pjoject would Government response awaited on determined deter- consist of slum upgra4ing, sites and key issues. mined services and technical assistance (Bank) to local construction)industry in Annaba. Ministry of To be (R) First phase of genera agriculture Appraisal report being prepared. Agriculture deter- development in the region of Sidi Bel Government response on key issues and Agrarian mined Abbes of about 73,000 Iha. including awaited as a prerequisite for Revolution (Bank) supply of machinery a1d equipment, further project processing. land consolidation, t~aining, strengthening of reselrch and extension facilities. Ministries of 29.0 (R) Education VI - Would ·nclude a vete- Post-appraisal mission in tbe Education, (Bank) rinary college and telhnical field. Higher Edu- cation, Heavy ~"•<=«- . Industry and Forests State Secre- To be (R) Fisheries I - Small a5d medium-size Project no longer under tariat for deter- boats for private fis~ermen and active consideration. Fisheries mined public fishing company!, maintenance Reporting will be discontinued. (Bank) and supply of fishing ~quipment. Ministry of To be l Improvements of fishink port facilities. Water Supply in greate Algiers Appraisal report being prepared. Hydraulics deter- Expected to include wotks needed mined to help alleviate the tritical Procurement: Project involves (Bank) water shortage in that area, and advance contracting, with award water supply/sewerage tudies in of a single contract for major small and intermediate! cities. civil works, and the possibility of retroactive financing of a small portion. To be To be Rural roads developmen~, including Preparation underway deter- deter- a maintenance and imprpvement by Government. mined SONELGAZ mined (Bank) To be (R) program, in selected regions. Power III - Project wold l Preparation underway by deter- focfoae '"'"' e,ewilscfon. Government. mined (Bank) CYPRUS Republic 12.0 (R) Third Highway Project - Project Appraisal report being of Cyprus (Bank) would include road con!truction, prepared. (Co-financing maintenance and upgradfng of is being sought.) rural and secondary roads, and related technical assistance. See page 1 for footnotes. - 51 - Member Country, and Borrower or Amount & Stage of Process- Implementing. Probable ing and Action on Agency ]j Lender 2/ Procurement!±_/ ---- CYPRUS (Cont'd) To be To be Southern Conveyor Water Resources Project preparation underway determined deter- Development Project. by Government with assistance mined of consultants. (Bank) To be To be (R) Project for energy conservation and Project preparation to begin determined deter- renewable energy production on a in November. mined pilot basis. (Bank) EGYPT, ARAB REPUBLIC OF General 56.6 Beheira Provincial Water Supply Credit approved by the Executive Organization (IDA) Project. Directors on June 2. IDA Project for Potable Preparation Facility advance of up Water/Beheira to $982,000 approved to prepare Water Company detailed engineering and tender documents, and to design detailed organizational changes. Egyptian To be (R) Fifth Drainage Project - Continued Project to be prepared Public deter- support for Egypt's field drainage by EPAD and Ministry Authority mined and bilharzia control program. of Health. for Drainage (Bank) Projects (EPAD) and Ministry of Health To be To be Rural Development Project - Support Project being developed determined deter- for developing rural services and by the Government with mined infrastructure to promote agriculture assistance from FAO/IBRD (Bank) development in the Governorate of Cooperative Program. Minya. Arab Republic 64.0 Third Telecommunications - Rehabilita- Loan approved by the Executive of Egypt Tele- (Bank) tion and expansion of the local tele- Directors on July 21. communications phone systems and the long distance Organization network in the smaller towns in (ARETO) lower Egypt and all the towns of Upper Egypt, as well as selected rural areas. To be To be (R) El-Dikheila Port Project - Construction Mission scheduled for mid-November determined deter- of additional port capacity. to discuss appraisal issues. mined (Bank) Arab Republic About Second Urban Development - Project Invitation to negotiate issued. of Egypt, 49.0 would consist of urban transport IDA Project Preparation Facility Governorates (Bank) improvements, pilot area upgrading, advance of up to $1 million approved of Cairo and and solid waste management schemes to prepare designs of selected Giza for greater Cairo. project items. Procurement: Retroactive financing of up· to $400,000 to be recommended. To be To be (R) El Dikheila Steel - Direct Basic agreements, including determined deter- Reduction/Electric Furnace Plant details of joint venture agreement mined to produce rebars and light and financing plan, signed by (Bank) sections. Egyptian authorities and Japanese consortium of three steel mills. Appraisal mission scheduled for December. Procurement: Prequalification of civil works contractors underway. See page 1 for footnotes. - 52 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency }j Lender'!:._/ Procurement 4/ EGYPT, ARAB REPUBLIC OF (Cont'd) Egyptian To be Abu Qir off-shore natu~al gas Appraisal report being prepared. General deter- development and delineation Petroleum mined project. Procurement: (i) Suppliers of Corporation (Bank) drilling rig services were (EGPC) invited to submit proposals by January 15, 1981. Estimated contract value: $20 million; (ii) Prequalification of contractors of off-shore production and utility platforms (including ancillary equipment) being finalized. Estimated contract value $25 million. Ministry To be Population III - Conti]ued support Project to be prepared of deter- for Egypt's health and population by Ministry of Health. Health mined programs. (Bank) Development 120,0 (R) Fifth Development Indus trial Bank/ Negotiations substantially Industrial (Bank) Small and Medium-Scale Industries completed. Board presentation 1 Bank of Project - Project will ~e designed to scheduled for December 22. Egypt meet priority areas in gypt's industrial strategy, th ough the 1 Development Industrial iJlank of Egypt, as well as provide cont~nued technical and financial assistance to the small-and medium-scale industrial sector. To be deter- mined To be deter- mined (Bank) l Agricultural Credit - P ovide long- term credit for agro-industries development. Project being developed by the Government. To be To be (R) Irrigation Modernizatio - Improve Appraisal report being prepared. 1 deter- deter- water control in existir g major mined mined irrigation systems • . (Bank) JORDAN Ministry of T9 be (R) Development of rainfed agriculture. Project composition under Agriculture deter- review with Government. mined (Bank) Jordan Valley To be Construction of a multi- purpose dam Further project processing Authority deter- on the Yarmouk River at Maqarin and suspended at Government's 1 mined improvement of irrigation facilities request, pending progress on (Bank) in Jordan Valley. I international riparian issues. Water Supply To be (R) Expansion and rehabilitation of Preparation underway by Corporation deter- water, sewerage, and sahita- Government. (Co-financing (WSC) mined tion systems in Zarga ahd Ruseifa. likely to be required.) (Bank) Ministries 25.0 (R) Education IV - Expansiol of technical Negotiations substantially of Education (Bank) and vocational educatioh centers, completed. Board presentation and Health; community colleges and tomprehensive scheduled for December 15. Vocational secondary schools. Training Institute (ARAB To be (R) Dead Sea Chemicals~ Production of Preparation mission scheduled POTASH deter- magnesium oxide and magr'esium oxide for end-November. COMPANY) mined products as by-products of the (Bank) potash refinery currently under construction. ' See page l for footnotes. - 53 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency]:_/ Lender :!:_/ Procurement !!__/ JORDAN (Cont'd) Jordan 25.0 (R) Power V - Stage I of the Aqaba Appraisal report being prepared. Electricity (Bank) steam power plant (2 x 130 mw) (Co-financing being arranged.) Authority and 400 KV transmission line (JEA) Aqaba-Amman. Procurement: $500,000 retro- active financing after January 1, 1982 for consultant services. To be To be Upgrading selected low-income Preparation underway by deter- deter- areas and development of new Government and consultants. mined mined housing areas in secondary cities. (Bank) MOROCCO To be To be (R) Fisheries - Development of fishing Contract signed with selected determined deter- fleet and related port infrastructure, consultants. Bank Project mined support services to fishing industry, Preparation Facility advance (Bank) and marketing facilities. of $1 million approved to finance sector and feasibility studies, and detailed design of investments. Ministry of 49.0 (R) Education V - Strengthening secondary Appraisal report being Education (Bank) teacher training, rural primary prepared. education, and research coordination. Procurement: Retroactive financing, in an amount to be determined, is ~xpected for preparation of. final design and bidding documents. To be To be Sewerage - priority treatment Preparation underway by determined deter- facilities; submarine outfalls; Government and consultants. mined extension of sewer network for (Bank) Casablanca-Mohammedia region. Ministry of 40.0 (R) Agricultural Development in Negotiations scheduled for Agriculture (Bank) the Middle Atlas, including end-November.· and Agrarian development of 35,000 ha of Reform pasture land for livestock, forestry development, extension services, small-scale irrigation and related infrastructure. National 70 .O (R) Ninth DFC project - To assist BNDE in Loan signing on November 3, Development (Bank) financing medium and small projects Bank (BNDE) in the manufacturing sector, promote ·export-oriented projects, and provide institutional support to BNDE. Ministry of To be Family Health Program including Preparation underway Public Health deter- basic health services, training, by Government. mined health education, environmental (Bank) sanitation, and technical assis- tance to Ministry of Public Health. Government 100.0 Structural Adjustment Loan - Financing Negotiations in progress. of Morocco (Bank) of selected agricultural and industrial imports, equipment and spare parts in' support of Government's short and medium term program to enhance. finan- cial stability, and to maintain credit- worthiness and adequate levels of investment and growth; technical assistance for needed policy and institutional reforms. See page 1 for footnotes. - 54 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}:_/ Lender'!:._/ Procurement ':.J MOROCCO (Cont'd) Fonds 20.0 Municipal and Village Loan Fund - Preparation underway d'Equipement (Bank) Support for FEC's program to assist by Government, Bank and FEC. Communal (FEC) local authorities to identify, prepare, and finance communal infrastructure and production projects. Ministry of To be (R) Agricultural development on about Pre-appraisal mission scheduled Agriculture deter- 250,000 ha. in the Khemisset province, for November. mined including: crop, forage and live- (Bank) stock development on rainfed lands; rehabilitation and extension of small-scale irrigation; and soil conservation measures. CADETAF 9.0 Small-Scale Mining: Preparation Date of negotiations to (Bank) and pilot phase testing of technical be determined. assistance and equipment programs to increase and upgrade ores mined by small-scale and artisanal miners. National 20.0 (R) Construction and equipment, and Negotiations in progress. Petroleum (Bank) experimental operation, of a pilot Research and unit to extract oil from shale Exploration deposits and studies to determine Procurement: Retroactive Office (ONAREP) the economic feasibility of commercial financing of $2.0 million oil shale extraction; to compare expected to be proposed to several extraction technologies cover expenditures related and to compare oil extraction and to project preparation. direct combustion of shale. To be 27.0 (R) Establishment of 23,000 ha. of Appraisal report being prepared. determined (Bank) forest plantations for timber, fuelwood and tannin; construction of 170 km. of forest roads; strengthening forest management. Government 70.0 (R) Small Scale Industry Project - To Loan signing on November 3. of Morocco (Bank) finance and provide technical as'sistance to existing and new small industries; includes studies related to export promotion. To be 60 .o Construction of Dchar el Oued Pre-appraisal mission tentatively deter- (Bank) multi-purpose dam and power scheduled for February. mined plant. Ministry of 80.0 (R) ·Highway IV - Rehabilitation of Preparation underway by Transport (Bank) primary and secondary roads, Government and consultants. construction and improvement of rural roads, completion of Casablanca-Rabat Expressway, and maintenance equipment. To be To be (R) Telecommunication project - Sector/identification mission deter- deter- Components to be identified. scheduled for November. mined mined (Bank) To be To be (R) Third Urban Development - Preparation by Government deter- deter- Includes slum upgrading in underway. mined mined Settat, Khouribga and Sale. (Bank) Government To be Electro-mechanical Industries Reconnaissance mission scheduled of Morocco deter- Project - To provide sectoral for November. mined support; project scope to be (Bank) defined. See page 1 for footnotes. - 55 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency]) Lender 2/ Procurement 4/ ---- MOROCCO (Cont'd) To be To be Development of small and medium Preparation mission tentatively deter- · deter- irrigation perimeters, scheduled for January. mined . mined (Bank) To be To be (N) Establishment of about 10 Preparation underway by Govern- deter- deter- fertilizer blending and dis- ment. mined mined tribution centers. (Bank) To be To be (N) Petroleum Engineering - Follow-up Preparation underway by Govern- deter- deter- to ongoing exploration project to ment. mined mined support continuation of drilling (Bank) in Essaoui, and preparation for a development to include four deep wells, market and engineering studies, OMAN Ministry of 15,0 (R) Highways Maintenance II - Components Negotiations in early November. Communications (Bank) may include equipment, rehabilita- tion, maintenance, and technical assistance and training, PORTUGAL Ministry of About Railways I - Development and Preparation underway. Transportation 40.0 Rehabilitation of National Railways, (Co-financing being sought; (Bank) KfW is likely to participate.) To be To be Industrial Restructuring - Textiles - Preparation underway. (Co- determined deter- Project components to be identified, financing likely to be required,) mined (Bank) Republic About (R) Rural Development in the Tras-os- Negotiations expected in December. of 50,0 Montes area, Portugal (Bank) To be To be Porto Region Water Supply and Sewer- Preparation underway, determined deter- age - Improvement of water supply and (Co-financing likely to be mined sewerage systems in Porto Region, required.) (Bank) Minho and Tras-os-Montes, To be To be Fisheries development project, Fish stock assessment survey determined deter- Components to be defined, underway (financed under mined Loan 1603). Government (Bank) preparing fisheries master plan. Siderurgia About (R) Expansion of capacity of Seixal Negotiations -scheduled for Nacional so.a steel plant. November/December. (Co-financing (SN) (Bank) will be required.) To be To be (R) Agro-industry - Credit for expanded Preparation underway. deter- deter- production and processing of fruits, (Co-financing likely to be mined mined vegetables, wine, and dairy products. required.) (Bank) To be About Industrial Energy Efficiency - Retro- Appraisal report being prepared. deter- 25,0 fitting of equipment to minimize (Co-financing likely to be mined (Bank) energy use. required,) Electricidade To be (R) Power VII - Investment Program for Appraisal report being prepared. de Portugal deter- 1982-84 to meet growth in electricity (Co-financing likely to be (EdP) mined demand and to maintain reliability required,) (Bank) of the power system. See page 1 for footnotes. - 56 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency];__/ Lender 2/ Procurement'!_/ ---- ROMANIA (INVESTMENT To be (R) Industry XII (Galati Steel) - Appraisal mission in the field. BANK) deter- Construction· at Galati steel enter- mined prise of a cold reduction mill and (Bank) tinning line. (INVESTMENT To be (R) Industry (Pigments) - Construc- Feasibility study underway. BANK) deter- tion at Giurgiu of a plant to mined produce pigments for the paint (Bank) industry. (INVESTMENT To be (R) Industry X - Polyurethanes - Plant Appraisal mission in the field. BANK) deter- to produce about 50,000 tpy of mined polyurethane systems, (Bank) (INVESTMENT To be (R) Industry XI (Energy Saving Project Feasibility study underway. BANK) deter- and Process Improvement in Steel (Co-financing likely to be mined Sub-sector) - Project components sought.) (Bank) to be determined. (AGRICULTURAL About (R) Agricultural Credit (Moldova) - Agri- Negotiations scheduled for mid- BANK) 85.0 cultural credits for Moldova Region November. (Co-financing likely (Bank) through Bank for Agriculture and to be sought.) Food Industry. (AGRICULTURAL To be (R) Agricultural Credit (Transylvania) - Appraisal report being prepared. BANK) deter- Regional development project, (Co-financing likely to be mined including financing of agricultural sought.) (Bank) and agro-industrial investment in Transylvania Region. (AGRICULTURAL To be (R) Agricultural Credit (Oltania) - Project preparation underway. BANK) ·deter- A line of credit through BAFI (Co-financing likely to be mined for agricultural development in sought.) (Bank) the Oltania Region. (AGRICULTURAL To be (R) Irrigation IX - Dr~inage, land Preliminary subsector review/ BANK) deter- reclamation and other related identification mission took mined works on a sectorwide basis place in October. A follow-up (Bank) within the context of the Five- mission scheduled for December. Year Plan. (Co-financing likely to be sought.) (INVESTMENT To be (R) Petroleum I - Enhanced oil recovery in Appraisal report under prepara- BANK) deter- existing fields (Videle and Baloria). tion. (Co-financing likely to mined be sought.) (Bank) (INVESTMENT To be Industry XIII (Pharmaceuticals)~ Feasibility study BANK) deter- Investment in 4 to 5 plants for underway. mined the manufacture of pharmaceutical (Bank) products and packaging materials. (INVESTMENT To be (R) Power.V .- Unidentified, but likely Preliminary studies underway. BANK) deter- to cover time slice investment for (Co-financing likely to be mined second half of 1981-85 Plan. sought.) (Bank) (INVESTMENT To be (R) South Constanta - Agigea Port - A Appraisal mission tentatively BANK) deter- deep sea port and inner barge basin scheduled for mid-January. mined and other related structures (Co-financing likely to (Bank) and equipment. be sought.) SYRIAN ARAB REPUBLIC To be 40.0 Sewerage I - Sewerage facilities Awaiting Government decision determined (Bank) for Hama and Homs, and ~nstitution- on institutional arrangements. building in sub-sector. (Co-financing arranged with Arab Fund.) See page 1 for footnotes. - 57 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agenci )j Lender '±_/ Procurement !:./ SYRIAN ARAB REPUBLIC (Cont'd) Syrian 28,0 (R) Telecommunications II - Expansion Preparation mission scheduled Telecommu- (Bank) of telecommunication services in for December, nications selected urban and rural areas, Establish- ment (STE) To be To be Priority roads in NE Syria, main- Feasibility study underway, determined deter- tenance operations and training, mined (Bank) Ministry of 15,6 Education II - Expansion of Approved by the Executive Education (Bank) technical/vocational training, Directors on April 23, To be 32 ,0 (R) Development of rainfed areas, Appraisal report being determined (Bank) fruit tree planting and farm prepared, (Co-financing being mechanization in Southern region, arranged with IFAD and KfW,) To be To be Sewerage II - Secondary treatment Project under preparation deter- deter- works, main interceptors and second- by Government, (Co-financing mined mined ary collection system for Damascus being sought,) (Bank) sewerage facilities. To be To be Education III - Extension of Preparation by Government deter- deter- vocational education and underway. mined mined training, (Bank) TUNISIA SOGITEX 18, 6 (R) Rehabilitation, modernization and :oan signed on October 27, (Bank) assistance to reorganize public sector textile company, Banque de 30,0 (R) Financial and technical assistance Appraisal report being prepared, Developpement (Bank) support to electrical and mechanical Economique de industries subsector; financial Tunisia (BDET) support to BDET's general operations, Ministry of To be Construction of rural roads, and Appraisal report being prepared, Equipment/ deter- associated agricultural investments, Ministry of mined Agriculture (Bank) Ministry of 42 ,0 (R) Rehabilitation, modernization, and Loan signed on October 27, Agriculture, (Bank) ·expansion of Tunisia's capacity for Office des handling, storage, and rail trans- Cereales port of domestic and imported grain; credit for conversion from bag to bulk harvest; technical assistance. To be To be (R) Urban Development III - Financial Pre-appraisal mission scheduled deter- deter- and technical assistance for the for December, mined mined rehabilitation of low-income (Bank) housing areas in several, Tunisian towns. Ministries of To be Education V - Establishment and Project being prepared Education and deter- extension.of vocational and apprentice by Government, Agriculture mined training centers and agriculture (Bank) Teacher Traini~g Institute, Ministry of 24,0 (R) Irrigation and agriculture Appraisal report being prepared, Agriculture (Bank) development in the Medjerda and Nebhana areas, See page l for footnotes, - 58 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender II Procurement 4/ TUNISIA (Cont'd) Societe To be (R) Water supply project focused on Appraisal mission in the field. Nationale deter- rural areas. d'Exploitation mined et de (Bank) Distribution des eaux (SONEDE) Office To be Rehabilitation and expansion Project being prepared National de deter- of sewerage systems in about by ONAS and Consultants. 1-Assainissement mined 30 towns.. (ONAS) (Bank) Societe de To be Rehabilitation and expansion Project under preparation by Fonderie et deter- of foundry. SOFOMECA and Government. de Mecanique mined (SOFOMECA) (Bank) To be To be Irrigation Network at the Lower Project under preparation by deter- deter- Medjerda River using treated Government and FAO/CP. mined mined sewerage, and water from Sidi (Bank) Salem Dam. To be To be (R) Miskar Gas Development - Project being prepared by deter- deter- Development of the off-shore ·Government and SEGMA, a mined mined gas field of Miskar (Gulf of joint-venture company estab- (Bank) Gabes). lished for this purpose. Ministry of To be (R) Rehabilitation of groundwater Preparation underway by Agriculture deter- irrigation perimeters ·in Central Government and FAO/CP. mined Tunisia, and a pilot scheme for (Bank) combined irrigated development and rainfed agriculture in one of the perimeters. TURKEY To be To be (R) Phase I of sewerage system for inner Second' stage apprai-sal mission determined deter- city population of Istanbul, including scheduled for December. Bank mined sewer networks and marine disposal; Project Preparation Facility (Bank) land use and sewerage study of advance of $500,000 helped finance Golden Horn area; and training. foreign exchange costs of consultant services for project preparation. Republic of 40.0 (R) Rural Development in Erzurum Appraisal report being prepared. Turkey (Bank) province. (Joint financing under consideration by IFAD.-) Procurement: Advance contracting and retroactive financing of up to $4 million for downpayments on c6nstruction equipment to be recommended. Agricultural To be Agricultural Credit II. To be identified and prepared Bank of deter- during supervision of on-going Turkey (TCZB) mined projects. (Bank) To be To be Production, processing and Government exploring possibility determined deter- marketing of improved seeds. of private sector involvement in mined proposed project. IFC may be (B_ank) involved. State Pulp To be (R) Paper Rehabilitation - Expansion Preparation by SEKA and con- and Paper deter- and modernization of existing sultants underway. Bank Project Enterprise mined facilities. Preparation Facility advance of (SEKA) and (Bank) $500,000 provided to finance con- Selected sultants' services for completing Private details for rationalizing, and Sector Paper energy saving at existing mills. Companies See page 1 for footnotes. - 59 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency!/ Lender'!) Procurement !:_I TURKEY (Cont'd) To be To be Livestock Products Development - Draft milk industry study determined deter- Modernization of extraction and completed; meat study mined processing of livestock products preparation being organized (Bank) ·from slaughtering stage onwards, by Government with Bank for both export and domestic assistance. markets; and rationalization and expansion of milk and milk prod- ucts industry. TSKB 100 ,0 (R) Export Industries I, Loans to Appraisal report being prepared. (Bank) private· sector for investment and (Commercial Bank co-financing to imported raw materials, technical be sought for funds to provide assistance and training. short-term credit to exporters for imported raw materials.) Republic of To be (R) Cement-Rehabilitation/modernization Project being prepared by public Turkey deter- of public and private sector sector cement company (CISAN) mined plants, and improvement of port and by consultants. (Bank) facilities for cement export, Republic To be (R) Structural Adjustment Loan III~ Timing dependent upon progress of Turkey deter- To support structural adjustment under Structural Adjustment mined in key areas. Loan II. Tranche review (.Bank) scheduled for November. Selected Public 60 .0 (R) Fertilizer Rehabilitation II - Appraisal report being prepared. and Private (Bank) Rehabilitation and modernization (Co-financing being sought.) Sector of selected facilities. Fertilizer Procurement: Advance contracting Companies and retroactive financing of about $3 million for downpayments for critically needed equipment to be recommended, To be To be Completion of on-going Project being prepared by deter- deter- irrigation and on-farm works; Government and Bank, with mined mined strengthening of extension FAO/CP assistance. (Bank) services. General To be (R) Highway Rehabilitation - Rehabili- Appraisal mission in the field. Directorate deter- tation and strengthening of (Co-financing is being sought.) of Highway mined priority highway sections and (Bank) improvements in highway rehabili- tation program. Republic To be (R) Development of selected Project Preparation Facility of Turkey; deter- lignite field(s) to expand advance of $950,000 approved TKI mined production; confirmation of to help finance foreign (new (Bank) lignite local deposits and exchange costs of preparation company) related technical assistance, work, YEMEN ARAB REPUBLIC i National About (R) Industry - Support for construction Feasibility study completed. Company for 5.0 materials industry. (Co-financing likely to be Industrial (IDA) required.) and Con- struction Materials (YEMROC) Ministry of About Education IV - Components include Appraisal report being prepared. Education 10.0 educational development center (IDA) and faculty of engineering. Ministry of About Urban I - Upgrading of low income Appraisal report being prepared, Municipalities 15,0 settlements and provision of sites IDA Project Preparation (IDA) and services in Sanaa; construction facility advance of $480,000 advisory services; housing credit; approved to finance contingency institution building. services. See page 1 for footnotes. - 60 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency }j Lender '!:_/ Procurement i/ YEMEN ARAB REPUBLIC (Cont'd) Ministry of About (R) Agricultural research. Appraisal report being prepared. Agriculture 12.0 IDA Project Preparation Facility· (IDA) advance of $250,000 approved to finance consultants~ services for project preparation. (Co-financing likely to be required: OPEC Fund has expressed interest.) Ministry of To be (R) Wadi Jawf - Agricultural deveiopment. Preparation underway. (Co- Agriculture deter- financing likely to be required: mined Islamic Bank has expressed interest.) (IDA) Ministry About (R) Health·- Physical extension of Appraisal report being prepared. of Health 8.0 Health Manpower Institute; (Co-financing likely to be (IDA) institutional support to Ministry required.) of Health and Health Manpower Institute. Highway About (R) Highways IV - Strengthening of Taiz- Appraisal mission scheduled for Authority 10.0 Alrnafraq Road, construction of 37 km late-November. (Co-financing (IDA) of high-priority secondary roads, likely to be required. Arab Fund and engineering studies. likely to participate.) Yemen-Oil About (R) Engineering Credit for selected phases Appraisal report being prepared. and Mineral 5.0 of Oil and Gas Exploration; feasi- IDA Project Preparation Facility Resources (IDA) bility studies for petroleum pipeline; advance of $850,000 approved Corporation and technical assistance to YOMINCO. to finance feasibility studies (YOMINCO) for petroleum pipeline and services of consu·ltant geologist. (Co-financing likely to be required; OPEC Fund has expressed interest in participating.) Confederation To be Rural Development Support - Preparation underway. of Yemeni deter- Assistance to development by means Development mined of increasing the operating effective- Associations (IDA) ness of the Local Development Associations (LDAs). Ministry of About (R) Agricultural Credit. FAO/CP preparation report Agriculture 10.0 being prepared. (IDA) Yemen General About Regional Electrification Preparation underway. (Co- Elect ri city 12.0 Phase II. financing likely to· be required.) Corporation (IDA) (YGEC) YEMEN, PEOPLE'S DEMOCRATIC REPULBIC OF Public To be (R) Power II - Electrification of the Appraisal mission in the field. Corporation deter- villages east of Mukalla and technical (Co-financing likely to be for Electric mined assistance. required.) Power (PCEP) (IDA) Ministry of To be (R)' Wadi Hadramout II - follow-up Preparation report being prepared Agriculture deter- project to Wadi Hadramout I ,to by consultants. Appraisal mission mined increase crop production through scheduled for March. (Co~financing (IDA) groundwater development· and likely to be required.) irrigation improvement. An IDA Project Preparation Facility advance of $500,000 has·been approved to finance consultants' services for the preparation of detailed designs; hydro-geological studies and topographical maps. Ministry To be (R) Fisheries III - Provision of fisheries Appraisal report' being prepared. of Fish deter- training institute at Adep, and (Co-financing likely to be Wealth mined village fisheries development in required.) (IDA) five selected villages. See page 1 for footnotes. - 61 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency l_/ Lerider 2/ Procurement !:._/ ---- YEMEN, PEOPLE'S DEMOCRATIC REPUBLIC OF (Cont'd) Ministry of To be (R) Education III - Industrial, commer- Negotiations scheduled for late- Education deter- cial, agricultural and teacher January. (Co-financing mined training institutes and technical likely to be required.) (IDA) assistance. Public To be (R) Water Supply II - Water supply for Project to be identified by Water deter- Greater Seiyun, and assistance to a mission in mid-November. Corporation mined Public Water Corp. (PWC) on sector (IDA) investment priorities. Ministry To be Health and Nutrition I - Components Government preparing project of deter- to be determined. with assistance of consultants Health mined financed by IDA Project (IDA) Preparation Facility advances of $83,000 and $183,400. Ministry To be Petroleum II - Onshore exploration Government preparing project. of deter- of Shabwa-Mareb Sedimentary Basin. Industry mined (IDA) Ministry To be (R) Education IV - Components to be Identification mission scheduled of deter- determined. for mid-November. Education mined (ID~) :tln!3t~::,- To be Highways IV - Componen~s -~ be Identification mission of deter- cte termined. scheduled for early 1982. Construction mined (IDA). YUGOSLAVIA (JUGEL) About (R) Power Transmission III - Appraisal mission in the 80.0 Financing of investments for field. (Substantial co- (Bank) national transmission network financing required.) and control system.· Community of About (R) Railway VI - To finance a portion of Pre-appraisal mission in Yugoslav 90.0 the 1981-85 Development Plans of the the field. Railways (Bank) Yugoslav Railway Enterprises. Pivredna About (R) Industrial Credit VI - Line of Appraisal report being prepared. Banka Sarajevo; 65.0 credit primarily for export- (Co-financing likely to be Stopanska Banka (Bank) oriented and energy saving/ required.) Skopje substituting industries in Bosnia- Herzegovina and Macedonia. Privredna About Bosnia Agriculture - Development of Appraisal report being prepared. Banka 34.0 agriculture and agro-industries Sarajevo (Bank) in Bosnia-Herzegovina. Gracanka 41.0 (R) Kosovo/Pristina Water Supply - To Board presentation on November 10. Water (Bank) improve water supply and distribution Enterprise facilities for Pristina, Obilic, Procurement: Retroactive financing Kosovo Polje and Podujevo. up to $6.2 million is recommended. Awards for the supply of pipes and construction of transmission lines have been made. To be To be Serbia Regional Development - Regional Preparation underway by determined deter- development primarily focussing on Government authorities. mined agriculture and agroindustries in (Bank) less-developed areas of Serbia. To be To be Montenegro Regional Development - Preliminary preparation determined deter- Regional development primarily begun by Government mined focussing on agriculture and authori tie_s, with FAO/Bank (Bank) agroin~ustries in less-developed Cooperative Program Assistance. areas of Montenegro. See page 1 for footnotes. - 62 -. Member Country, and Borrower or Amount & "Stage qf Process- Implementing Probable ing and Action on Agency}) Lender '!:_/ Procurement!!._/ YUGOSLAVIA (Cont'd) To be To be al Development - Preparation underway by determined deter- lopment primarily government authorities, with mined focussing on agriculture and assistance from FAQ Co- (Bank) agroindustri sin less-developed operative Program. areas of Kostvo. To be To be Water Supply Sewerage for town of Preparation underway by determined deter-. Tuzla. Governm~nt authorities·. mill.ed (Bank) To ·be To be (R) Sava Drainag II - Provision of Appraisal mission in the determined deter- drainage to bout 48,000 ha in field. mined Lonsko Polje (Croatia), and 19,000 (Bank) ha in Semberija (Bosnia Herzegovina), 1 pumping.stat ons, soil amelioration, livestock fa ms, and construction and farm equ pment. To be About Highways XII - Sector loan covering Master Plans being pre- determined 90.0 a three-year tranche (FY83-85) pared by Republican/ (Bank)- .of the Highw y Master Plans of Provincial governments.· selected les -developed Regions. Kosovo ska About (R) Industrial C Line of Appraisal mission scheduled Banka Pristina; 55."0 credit prima ily for labor intensive for February/March. (Co- Investiciona 'Bank) projects in osovo and Montenegro. financing likely to be Banka Titograd required.) Privredna To be Bosnia Forestlry - Development of P,eparation underway _by Banka deter- forest roads and plantations, and Government authorities Sarajevo mined provision of logging equipment. with assistance from FAO/CP. (Bank) (Substantial cofinancing to be required.) See page 1 for foot~otes. - 63 - Member Country, and Borrower or Amount & Stage of Process~ Implementing Probable ing and Action on Agency }j Lender 'l:_/ Procurement 4/ VI. LATIN AMERICA AND CARIBBEAN ARGENTINA Ministry of 115.0 Ports I - Expansion and moderniza- Project preparation underway. Commerce and (Bank) tion of Bahia Blanca port facilities Maritime for grain exports. Total project cost Affairs estimated at $180 million of which about $130 million in foreign,exchange. To be 50.0 Bajos Submeridionales - Flood control Project preparation largely deter- (Bank) and agricultural development in completed. Proposed project mined northern provinces. design awaits approval by, participating provinces and Federal Government. Obras Up to Water Supply and Sewerage - Improve- Project preparation underway. Sanitarias 50.0 ments and extensions to water supply de la Nacion · (Bank? and sewerage systems in Rosario, (OSN) Cordoba, Mendoza, and Buenos Aires including technical assistance for institutional improvemen~. (BANCO 100.0 (R) Industrial Credit 11 - Financing 'Board presentation tentatively NACIONAI (Bank) structural adjustment in industry scheduled for December. DE through BANADE. DESARROLLO) Procurement: Retroactive financing (BANADE) of up to $5 million to be proposed to finance the foreign exchange cost. of equipment. Retroactive financ·ing would be restricted to subloans not exceeding the equivalent of $500,000. Ministry 100.0 Highway sector - Improvements and Further processing of project delayed of (Bank) construction of sections of the until after Government and Bank review Transport national highway network in FY1982- 1981-82 program of the National and Public 84 investment program. Total Department of Roads. Works program cost estimated at $1,060 million of which $350 million in foreign exchange. (YACIMIENTOS 150.0 Oil and Gas Development II Project identification PETROLIFEROS (Bank) in progress. FISCAIES (YPF) BAHAMAS Ministry 8.6 (R) Urban Development - Improvement Awaiting final approval from Govern- of (Bank) in low-income area of Nassau ment. ·Board.presentation planned for Finance including upgrading of infra- December. (Cofinancing with commercial structure and housing, clearing banks envisaged.) of land titles, investment promotion and technical assistance. Procurement: Retroactive Total project cost estimated at financing of up to $625,000 to $24.3 million of which $10.6 mil- be proposed to cover equipment lion in foreign exchange. and technical assistance. BARBADOS Ministry 12.0 Structural Adjustment Loan - To Proposal under consideration. of (Bank) support government economic program. Finance Ministry 2. 5 (N) Technical Assistance - Strengthening President's Report being of (Bank) of institutions dealing with agri- prepared. Finance culture and energy cons~rvation; project preparation. See page 1 for footnotes. - 64 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency }j Lender 2/ Procurement'!_/ ---- BOLIVIA (EMPRESA 35.0 Power V - Central Oriental inter- Appraisal report being reviewed, NACIONAL DE (Bank) connection system, fourth unit for ELECTRICIDAD- Santa Isabel, and study of ENDE's (ENDE)) .and DINE's organizational expansion, Procurement: Advance and a national tariff study. Total contracting under ICB project cost estimated at $57.3 satisfactory to Bank for million of which $45 million in about $2.8 million; foreign exchange. retroactive financing of $0.2 million. Ministry of 10,0 Santa Cruz Agricultural Development - Appraisal report being reviewed. Rural and (IDA) Credit, technical assistance and IDA Project Preparation Facility Agricultural social· infrastructure for settlement advance of $50,000 approved for Affairs consolidation in Northern Santa Cruz. technical studies. Total project cost estimated at $16.9 million of which $5.7 million in foreign exchange. Ministry of Up to Agricultural Credit II - Credit and Project preparation dependent Rural and 10.0 technical. assistance for crop and on measures now being considered Agricultural (Bank) livestock.development. for instfrutional and 'financial 'Affairs strengthening of Banco Agricola de Bolivia, (YACIMIENTOS 60.0 Oil an.d Gas Development - Liquids Negotiations completed. PETROLIFEROS (Bank) condensate extraction and gas re- FISCALES cycling at Vuelta Grande gas Procurement: (a) Project Prepara- BOLIVIANOS) condensate field and secondary oil tion Facility advance of $1 million· (YPFB) ·recovery at Monteagudo oil fields; approved for gas .:ecycling simulation Total p.·~ject cost estimated aL study, detailea ~esign and prepara- $74 mi~::;n of which $60 million tion of bidding documents; (b) advance in fore ...,.:, exchange. contracting under !CB satisfactory to Bank for up to $24 million and retroactive financing of up to $6 million for drilling under con- sideration. Ministries 20.0 Fourth Mining Credit - Assistance for Appraisal report being prepared. of Finance (Bank) small aqd medium mining operations and Mines through local financial intermediaries, and Banco Indus.trial and Banco .Minero. Metallurgy BRAZIL (COMPANHIA Up to (R) Carajas Iron Ore Mining - Mine, Appraisal mission in the field. VALE DO RIO 300.0 ·rail and port facilities for (Private cofinancing DOCE (CVRO)) (Bank) export of up to 35 million tons expected to be needed.) per year of high grade iron ore. (REDE Up to (R) RFFSA III (Railways) - Expansion and Project preparation underway. FERROVIARIA 200.0 rehabilitation program. FEDERAL, S.A. (Bank) (RFFSA)) (CENTRAIS 180.0 (R) Power Distribution - Credit line for Project being prepared. ELETRICAS (Bank) power distribution sub-projects - BRASILEIRAS sector loan. S.A.) (ELETROBRAS) Territory of 240,0 (R) Northwest Region Development Board presentation scheduled for Rondonia and (Bank) Program - Highway construction December 1. Federative component. Total project cost Republic of estimated at $687 million of which Brazil $240 million in foreign exc~ange. Ins ti tu to 80.0 Northwest Region Development Preappraisal mission scheduled for Nacional de (Bank) Program III - New land settlement. January. Colonizacao e Reforma Agraria (INCRA) See page l for footnotes. - 65 - Member C,;,untry, and Borrower or Amount & Stage of Process~ Implementing Probable ing and Action on Agency y Lender '!:./ Procurement 4/ BRAZIL (Cont'd) Federative Up to (R) Northwest Region Development Negotiations scheduled for Republic of 26 .o. Program II - Rural development December. Brazil (Bank) in ·state of Mato Grosso. Total project cost estimated at $76.4 million of which $12.2 million in foreign exchange. To be 50.0 (R). Maranhao Rural Develop;,,ent pevelop- Post-.appraisal' mission scheduled determined ( Bank) ment project in two adjacent areas ·for January. (Baixada Maranhense and part of Alto Turi region) to improve agri- c~lture and social infrastructure, land tenure situation and access to land by landless farmers. Total project cost estimated at $145 million of.which $29 million in, foreign exchange. State of Up to (R) Health - Development of health Appraisal mission scheduled for Sao Paulo 50.0 services in State of Sao Paulo. January. (Bank) To be 150.0 (R) Secondary and Feeder Roads III - Appraisal mission scheduled for determined (Bank) Construction and improvement. December. To be i1ci.o (R) Integrated Urban Development in Appraisal mission in the field. determined (Bank) Recife Metropolitan Region. To be 30.0 (R) A.mazonas Agricult~ral Dev~lopment Appraisal mission in the field. determin~d (Bank) Project aimed at improving production of foodcrops-in selected areas oi flood lands and introducing rational cultivation of highlands. About 5,000 ha. of smallholder oil palm/ may be developed. The project would. assist from 8,000 to 10,000·small farmers. Territory 67.0 (R) Northwest Region Development Program - Board presentation scheduled of Rondonia (Bank) Agricultural development and envir- for December·l. and Federative onmental protection. Consolidation Republic of and rural development. in Territory Brazil of. Rondonia, establishment of measures to protect forest reserves and eco- logical stations; ecological ·research. Total project cost estimated at $200 million of which $42 million in forei'gn exchange. Territory of 13.0 (R) Northwest Region Development Program Board presentation scheduled Rondonia and (Bank) I - Health component. ·Total project for December L Federative cost estimated at $37.7 million of Republic''of which $6 million in foreign exchange. Brazil (BANCO 200.0 (R) Water supply .and sewerage in the Appraisal misslon postponed NACIONAL (Bank) low-income areas of State of Sao pending notification by DE HABITACAO , Paulo. ·. ~overnment of availability (BNH) of counterpart ·funds. See page 1 for footnotes. - 66 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency):_/ Lender'!:._/ Procurement!}_/ BRAZIL (Cont'd) Sec re tar ia . de 50,0 (R) Bahia Rural.Development II - Preparation mi.ssion scheduled Planejamento da (Bank) Integrated rural development in for January, Presidencia da .northeast .Bahia to assist small Republica farmers through provision of improved support services, land redistribution and infrastructure development, To be Up to (R) Forestry Development, including Preparation mission scheduled determined 70.0 reforestation for production of for Dec.ember, (Bank) charcoal in Minas Gerais, Ministry of Up to (R) Education V - Strengthening of Brazil's Identification mission in the Education 50.0 secondary agricultural school system field. and Culture (Bank) through .provision of training, equip- ment, furniture, curriculum develop- ment and other technical assistance. (BANCO 250.0 (N) Development Banking II - Implemen- Preparation mission NACIONAL DO (Bank) tation of.integrated. assistance scheduled for December, DE SENVOLVIMENTO programs for small and medium ECONOMICO (BNDE)) enterprises. CHILE Servicio 30.0 (R) Water Supply - In Regions IV and This project is no longer in Nacional (Bank) VIII, and technical assistance. the lending program and reporting de Obras will be discontinued. Sanitarias (SENDOS) To be Up to (R) Industrial Credit - For small and ·This project is no longer in the deter- 75,0 medium industries. lending progra~ and reporting mined (Bank) will be discontinued, Ministry To be (R) Highways Reconstruction II - Identification mission scheduled of Public deter- Primarily rehabilitation Qf for November, Works mined roads, (Bank) COLOMBIA Ferrocarriles 70,0 (R) Railways VII - Track and equipment Project being updated to reflect Nacionales de (Bank) rehabilitation, engineering studies changes since appraisal, Colombia {CNR) and consultants' services for institutional strengthening. Total project cost estimated at $149 mil- lion of which $103 million in foreign exchange, Ferrocarriles Up to Railways VIII - Rehabilitation and Project preparation dependent Nacionales 120.0 modernization of railways and tech- on progress of Railways VII, de Colombia (Bank) nical assistance; possibly construc- (CNR) tion of improved alignments, (CARBOCOL- 10,0 Coal Engineering - National survey Project preparation INGEOMINAS) (Bank) of coal deposits and engineering of underway, one or two most promising cases. Also _marketing studies and training, See page 1 for footnotes, - 67 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}:_/ Lender 2/ ---- Procurement 4/ COLOMBIA (Cont'd) (EMPRESA Up to Petroleum Development I - Financing Negotiations postponed to COLOMBIANA 150.0 of secondary recovery, seismic sur- permit Borrower to firm-up DE PETROLEOS (Bank) veys and follow-up discovery invest~ investment program and (ECOPETROL)) ments. Total project cost estimated financing plan. (Co- at $341 million of which $205 million financing of about $70 in foreign exchange. million required.) Procurement: Advance con- tracting of $10.6 million for seismic surveys, with retroactive financing esti- mated at $2.5 million. (EMPRESA 359.0 Guavio Power Development - Construction Loan approved by the Executive ENERGIA (Bank) of hydro plant. Total project require- Directors on May 28. ELECTRICA ments estimated at $1,303 million of (Parallel IDB financing of up DE BOGOTA which $928 million in foreign exchange. to $100 million and co-financing (EEEB)) of up to $470 million, including $130 million suppliers credits, envisaged.) (CORPORACION 36.0 At.lantic Distribution Expansion - Loan approved by the Executive ELECTRICA DE (Bank) Village electrification. Total Directors on M~y 21. LA COSTA project cost estimated at $68.7 ATLANTICA million of which $36 million in (CORELCA)) foreign exchange. (BANCO DE LA 60.0 Agro-Industries - Credit for large- Project preparation underway. REPUBLICA (Bank) and medium-scale agro-indµstries; (BOR)) possible pilot credit/technical assistance component for small scale agro-industries; agro-industrial research. (CARBONES DE Up to El Cerrejon Coal - Coal mining for Appraisal to be scheduled when basic COLOMBIA 300.0 export (Block B of the Cerrejon understanding·· reached with project (CARBOCOL)) (Bank) deposit) and port and railway sponsors. (Substantial co- construction. financing required.) (CAJA 29.0 Agricultural Credit V (Caja) - Credit Appraisal dependent on agreement AGRARIA) (Bank) for small- and medium-scale farmers by CAJA/Government on financial and and ranchers as well as for small- management improvements as pro- scale agro-industries and rural posed by Bank. enterprises. (INSTITUTO DE 9.0 (R) Upper Magdalena Watershed Manage- Negotiations in early November. LOS RECURSOS (Bank) ment - Pilot project to develop NATURALES support system for managing water- RENOVABLES shed area and for preventing further Y DEL MEDIO erosion. Pilot phase will test out AMBIENTE series of interventions in 3 sub- (INDERENA)) watershed areas and prepare large project for most important basin. Total project cost estimated at $25.3 million of which $8.9 million in foreign exchange. (EMPRESAS 29.0 Barranquilla Water - Expansion of Project preparation PUBLICAS (Bank) water facilities (construction of underway. MUNICIPALES DE a new water treatment plant); BARRANQUILLA) extension of water distribution and sewerage networks and tech- nical assistance .. See page 1 for footnotes. ! 1 - 68 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency]) Lender!/ Procurement!!_/ COLOMBIA (Cont'd) Ins ti tu to 37,0 Irrigation Rehabilitation I - Loan approved by the Exective Colombiano (Bank) Reconstruction and expansion of Directors on May 19, de Hidrologia, existing irrigation schemes for Metereologia y small farmers and beneficiaries Procurement: Retroactive financing Adecuacion de of land reform, Total project of up to $400,000 for civil works ·Tierras (HIMAT) cost estimated at $86,3 million of approved, which $37 million in foreign exchange, To be 53 ,5 (R) Rural Development II - Continuation Negotiations scheduled for determined (Bank) of integrated rural development January, program initiated under Rural Development I, Total project cost estimated at $180 million of which $46 million in foreign exchange. (EMPRESAS 45,0 (R) Ports - Modernization of existing Draft final report of UNDP- PUERTOS DE (Bank) ports and installation of container financed study has been reviewed COLOMBIA terminals. by Government and the Bank, ( COLPUERTOS)) Appraisal dependent on Government action on key issues, (EMPRESAS 85.0 (R) Playas Power (Hydro) - Development Loan signing on November 6, PUBLICAS DE (Bank) of 200 MW hydroelectric plant, Total ($85 million IDB co-financing MEDELLIN project cost estimated at $311,4 mil- arranged,) (EPM)) lion of which $176,8 million in foreign exchange, (EMPRESA 60.0 Phosphate Fertilizer-Construction of Project preparation underway. COLOMBIANA (Bank) facilities for processing of local DE MINAS) phosphate rock, including phosphoric (ECOMINAS)) acid, sulfuric acid, TSP and DSP plants, Ministerio de Up to (R) Highway VIII -·Primarily construction Negotiations tentatively scheduled Obras 150,0 ·and rehabilitation of roads, Total for December, Publicas y (Bank) project cost estimated at $260 million Transporte of which $150 million in foreign (MOPT) exchange. Interconexion Up to Canafisto Power- Hydropower, Project preparation underway, Electrica 150.0 S,A, (Bank) (ISA) (CORPORACION Up to · Urban Transport - Credit program to Project preparation FINANCIERA so.a finance the construction of inter- underway. DEL (Bank) ·urban bus· terminals; also, technical TRANSPORTE assistance to improve the efficiency ( CFT)) of inter-urban transport services, Ministry of 15 ,0 (R) Basic Rural Education - Expand Appraisal report being prepared, Education (Bank) availability, appropriateness and quality of rural primary education, Project is national in scope and includes soft-ware as well as buildings, (EMPRESAS Up to Rio Grande Hydropower - Generation, Project preparation underway, PUBLICAS DE so.a MEDELLIN) (EPM)) (Bank) (CORPORACION Up to CVC Calima, Distribution/Transmission/ Project preparation underway. AUTONOMA DEL 62,5 Control-Generation, distribution and VALLE DEL RIO (Bank) control. CAUCA)(CVC)) See page 1 for footnotes. ..: 69 - Member Country, and Borrower or Amount & Stage of .Process- Implementing Probable ing and Action on Agency y ~3_/ Procurement 4/ COLOMBIA (Cont'd) ( CORPORACION 300.0 Urra Hydroelectric. Project preparation underway. ELECTRICA DE (Bank) LA COSTA ATLANTICA (CORELCA)) COSTA RICA To be 15.0 Pococi-Limon Regional Agricultural Project preparation underway. determined (Bank) Development. Instituto Up to Development of Coto Sur area. Total Project under discussion with de Tierras 26.5 project cost estimated at $49 million Government.. (Possible co- y Colonizacion (Bank) of which $26.5 million in foreign financing with CDC.) (ITCO) exchange. Ministry of Up to Education II - Support for manage- Appraisal report being prepared. Education 3.5 ment reorganization and institution Bank Project Preparation (Bank) building for education system. Total Facility advance of $100,000 project cost estimated at $7.0 million approved for consulting services of which $3.5 million in foreign and traini.ng of project staff. exchange. Instituto Up to Power VII - Palomo hydroelectric Further processing postponed Costarricense 45.0 power plant and transmission dist'ri- due to changes in ICE's invest-. de (Bank) bution expansion program. ment program and review of Bank's Electricidad lending program. (ICE) DOMINICA Ministry 5.0 (N) Emergency Roads - Rehabilitation Appraisal mission in the field. of Finance (IDA) and maintenance of high priority roads. DOMINICAN REPUBLIC (BANCO 30.0 (R) Industry I - Financing of small and Project has been withdrawn from CENTRAL) (Bank) medium scale industry and export Board consideration pending related enterprises. Total project joint project review with cost estimated at $50 million of Government and Bank. which $30 million in foreign exchange. Instituto Up to Sites and Services I - For Santo Appraisal report being prepared. Nacional 25.0 Domingo. Total project cost esti- $500,000 advance granted under de la (Bank) mated at $41 million of whi~h $14 Bank Project Preparation Facility Vivienda million in foreign exchange. for topographic survey, mapping, (INV!) soil investigation; prelimi- nary engineering and final design; survey of target groups; community motivation and assistance program. Ministry of 15 .O (R) Education III - Support and expansion Appraisal mission Education (Bank) of rural primary education facilities. scheduled for November. Corpoiacion 50 .O (R) Rio Blanco Power - Distribution Appraisal mission tentatively Dominicana de (Bank) system for Santo Domingo. scheduled for December. (Co- Electricidad financing from suppliers will be needed .• ) Corporacion 15 .0 (R) Coal Pier - Construction of berth for Project preparation underway. Dominicana (Bank) unloading coal vessels, and studies An·advance of $500,000 under the de Electricidad for medium and long-term coal import Bank Project Preparation Facility needs and required facilities. was approved for preparation of preliminary and final engineering studies. Consultants for the studies.have been appointed. See page 1 for footnotes. ( - 70 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency°}:_/ Lender'!:._/ Procurement!!._/ ECUADOR lnstituto 100.0 (R) Power I - INECEL transmission Loan to be signed Ecuatoriano (Bank) system expansion. Total project November/December. de Electrifi- cost estimated at $151 million cacion (INECEL) of which $115 million in foreign exchange including interest during construction. Ministerio 20.0 (R) Rural Development II (Puerto Ila- Loan to be signed November/ de Agricultura (Bank) Chone) - Project components to include December. y Ganaderia improvement of rainfed agriculture; credit and technical assistance; feeder roads and social infrastructure. Total project cost estimated at $57.1 million of which $19 million in foreign exchange. Ministerio 17.0 (R) Agriculture/Rural Development III - Loan to be signed November/ de Agricultura (Bank) Credit, roads and social infra- December. y Ganaderia structure in Esmeraldas Province. Total project cost estimated at $48.5 million of which $13.3 million in foreign exchange. Corporacion Up to Petroleum I - Project components Project preparation Estatal 70.0 to include oil field rehabilitation underway. Petrolera (Bank) and water injection in oil fields. Ecuatoriana (CEPE) lnstituto Up to _Water Supply and Sewerage - For Project preparation Ecuatoriano 40.0 medium-size cities, and a technical underway. de Obras (Bank) assistance program. Sanitarias Banco 39.5 (R) Urban Development II - National Appraisal report being prepared. Ecuatoriano (Bank) low-cost housing program, sites de la and services and housing loans. Vivienda Total project cost estimated at $112 million of which $27 million in foreign exchange. Ministry of 20.0 Cocoa Rehabilitation - Improvement Project preparation Agriculture (Bank) of existing cocoa crops. underway. and Banco Nacional de Fomento Corporacion Up to (R) DFC V - Credit for industrial firms Negotiations scheduled Financier a 60.0 through finance companies. Total for mid-November. (Co-financing Nacional (CFN); (Bank) project cost estimated at $240 being considered.) Ecuatoriana de million of which $120 million in Desarrollo, S.A.; foreign exchange. Compania Financiera (COFIEC), and other financing companies Servicio 16 .0 (R) Education 111 - Vocational Training. Appraisal report being reviewed. Ecuatoriano (Bank) Total project cost estimated at $32.7 de Capacitacion million of which $16.0 million in Profesional foreign exchange. (SECAP) Instituto 80.0 Power Generation - Toachi hydroelectric Project preparation underway. Ecuatoriano de (Bank) development. Electrificacion (INECEL) See page 1 for footnotes. - 71 - Member Country, an:d' Bor:rower or Amount &·' Stage of Process- Implementing Probable ing and Action on Agency )j Lender 'l:_/ Procurement!!._/ ECUADOR (Cont'd) Corporac::ion 30.0 Small-Scale Enterprise Credit II - Project preparation underway. Financier a (Bank) For small industries through banks Nacional and finance companies. (CFN) EL SALVADOR Banco 10.0 DFC - Provision of long-term indus- Project priority to be Central (Bank) trial credit for small- and medium- reviewed with Government. size enterprises . . Total project ~ost estimated at $19.8 million of which $10 million in foreign exchange. Ins ti tu to Up to Urban Development III - Squatter Project priority to be de Vivienda 30.0 upgrading, serviced-sites, employ- reviewed with Government. Urbana (IVU) , (Bank) ment generation and technical Federacion de assistance. Cajas de Credito ( FEDECCREDIT~) , Fundacion. Salvador.ena lie Desarrollci y · Vivienda Min.ima (FSDVM) Comision Up to Ports I - Expansion of Acajutla Project priority· to be Ejecutiva. 30.0 Port to include container handling reviewed with Government. Portuaria · (Bank). facilities. Autonoma (CEPA) Ministry of Up to ·water Supply and Sewerage Engineering - Project priority to· be Planning 7.o Preparation of projects for water· reviewed with Government. (Bank) supply and sewerage for San Salvador and municipalities and technical assistance. Total project cost estimated at $9 million of whi'ch $7 million in foreign exchange, GUATEMALA Banco Nacional To be Urban Development - To benefit about Further preparation de la Vivienda deter- 28,000 households in Guatemala City· depends on ·progress of mined and five to six other major cities; urban component of earth- (Bank) upgrading of existing informal settle~ quake reconstruction ments in Guatemala City with infra- project. structure, and individual credits for home improvement and consolidation; as well ~s credits, technical assis- tance and commercial industrial sites to benefit very small-scale labor- intensive enterprises. Empresa To be (R) Communications III - Further expansion Appraisal mission scheduled Guatemalteca deter- of telephone network including cable for mid-November. de mined network, distribution and long Comunicaciones (Bank) distance faci_lities, (GUATEL) To be To be (R) Power V - Western transmission Project preparation underway. determined deter- line and/or normal distribution Decision on project expected mined expansion program of EEGSA by January, once Government (Bank) (Distribution company of Guatemala takes decision about s6urce City). of financing for power sector projects • .GUYANA MinistrY 2.0 Dil Exploration Promotion - Data Appraisal report being of Energy (IDA) compilation and evaluation, review prepared. and of legislation, contract super- Mines vision and training. Total project cost estimated at $2.3 million of _which $2 million in foreign exchange. See page 1 for footnotes. - 72 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency );j Lender II Procurement!:_/ HAITI Organisme de Up to Integrated Rural Development of Project preparation underway. Developpemerit 13.0 Northern Plain - Second stage. du Nord (ODN) (IDA) Office 10.0 (R) Urban Development I -' In two provinci'al Preparation mission scheduled National (IDA) towns,, upgrading of central market for November. IDA Project Pre- du Logement in Port-au-Prince and related paration Facility advance for technical assistance. consultants' services increased to $1 million. Ministry of 15.0 Education III - Construction, furnish- Appraisal report being prepared. Education (IDA) ing, equipping of primary teacher An IDA Project Preparation Facility training and vocational schools. advance of $550,000 has been Total project cost estimated at $16.8 approved for consulting services, million of which $7.7 million in equipment, and salaries of foreign exchange. additional staff to be hired for start-up of project. Ministry of 3 .O (R) Pilot Forestry Project - Pilot Appraisal report being prepared. Agriculture (IDA) forest management, trials and ( Co-financing will be r.equired.) studies, ·technical assistance, training and extension. Total project cost estimated at $6 million of which $4.2 million in foreign exchange. . Ministry 15.0 (R) Highways VI - Bridge reconstruction, ~ppraisal report being prepared • of Public (IDA) and strengthening/rehabilitation An IDA Project Preparation Facility Works, of primary roads. Total project advance of $300,000 has been approved Transporta- cost estimated at $21 million of for consulting services and to tion and which $16 million in foreign complete final engineering design Communication .exchange. for rehabilitation and strengthen- 'ing of drainage structures and roads. Electricite :Z6.0 (R) Power III - Generati,on, transmission Ap.praisal report being prepared. de Haiti (IDA) and distribution, mainly in Port- .(Co-financing being sought.) (EDH) au'--Prince area. - Total project cost estimated at $36.3 million of which $29.9 million in foreign exchange. HONDURAS Central 30.0 (R) Industrial Credit I~ - Credit for Negotiations scheduled for Bank (Bank) small and medium industry. Total mid-November. project cost estimated at $57 million of which $30 million in foreign · . excha,ige. San Pedro Up to (R) Water supply, sewerage and drainage - Review with Government in Sula 13.0 for San.Pedro Sula and technical pr~gress. Municipal (Bank)° assistance to SANAA and DIMA. Corp. (DIMA) 12.0 and the (IDA) National Service for Water and Sewerage (SANAA) JAMAICA Port 13.5 (R) Kingston Free Zone - Construction Negotiations in progress. Authority (Bank) of buildings and infrastructure for of Jamaica free trade zone area, and technical assistance. Total project cost estimated at $24.3 million of which $14.7 million in foreign exchange. See page 1 for footnotes. - 73 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency }j Lender~/ Procureme~t '!_/ JAMAICA (COnt~d) To -be 12.0 Urban Transport - Improvement in Project preparation deter- (Bank) infrastructure, traffic manage- underway. mined ment and rolling stock. To be 20.0 Industrial Credit - Long-term Project.scope being reviewed. deter- (Bank) development credits to export mined industries, including small- scale industries. To be 6.0 Technical Assistance - Technical President's Report deter- (Bank) assistance· in economic. and financial being· prepared. mined management. Ministries of 6.8 (R) Technical and vo·cational Training -,- Negotiations scheduled for Education and (Bank) Improvement of technical/vocational . mid-November. Youth and education system. Includes ~ssistance Community for College of Arts, Science and Procurement: Retroactive Development Technology, the Vocational Training financing of up to $.100,000 Development Institute and establish- for project preparation proposed. ment of two industrial production centers. Secretaria de To be Forestry. · Awaiting Government submission Agricul tura deter- ·Of project proposal. y Recursos mined Hidraulicos (Bank) (SARH) Banco Up to Fisheries. Project preparation underway. ·Pesquero y 50.0 Portuario (Bank) (BANPESCA) Nacional Up to Installation of foundry. forge in Market and .feasibility studies Financiera 100.0 Lazaro Cardenas. being reviewed. (Co-financing· (NAFINSA) (Bank) being sought.) Nacional 175 .0 (R) Rural Development - PIDER III. Loan signing on November 6. Financier a (Bank) Total project cost estimated at (NAFINSA) $506 million of which $175 million in foreign exchange. Secretaria de 75.0 Pujal Coy - Irrigation and agricul- Project preparation Agricultura y (Bank) tural development in the Panuco underway. Recursos Basin. Hid'raulicos (SARH) Secretaria 100.0 Agricultural Development - Appraisal report being prepared. de Agricultura (Bank) San Fernando Valley. y Recursos Hidraulicos (SARH) Nacional 150.0 Capital Goods Credit - Development Appraisal report being prepared. Financier a (Bank) of capital goods industries. Total (NAFINSA) project cost estimated at $1,000 million of which $500 million in foreign exchange. To be 60.0 (R) Agricultural Marketing - Improvement Project preparation underway. deter- (Bank) of infrastructure and services for mined storage, transpOrt, and sale of perishable ag~icultural products. See page 1 for footnotes. - 74 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency y Lender ,Y Proc11rement !!._/ MEXICO (Cont'd) Secretaria Up to PIDER IV - Integrated ·rural develop- Project identification awaiting de 200.0 ment. impact evaluati'on of ·che earlier Programacio.n (l}ank) PIDER projects. y Presupuesto (SPP) Nacional 60.0 Pollution Control - Credit to in- Appraisal report being prepared. Financier a (Bank) dustries, mainly those located (NAFINSA) in the Mexico.Valley, to install pollution control equipment and technical assistance in implementing pollution control progr,ams. Total p,;oject cost estimated at $142 million Qf which $75 million in foreign exchange. · Nacional 100.0 Irrigation Rehabil·itation Bajo Appraisal report being prepared. Financier a (Bank) Bravo/Baja San Juan· II - (NAFINSA) Continuation of ongoing Bajo Rio Procurement: Advance contracti~g Bravo irrigation· project to in- with possibility of retroactive crease agricultural production financing of up to 10% of loan in the Bajo Rio.Bravo/Baja amount proposed for construction Rio San Juan Irrigation District. of drainage network. Total pr~ject cost estimated at $533 million of which $177 million in foreign exchange. BaifCO. 200.0 Water Supply and Sewerage - Con- Project preparation under~gy. Nadonal. de (Bank) struction of wat.er supply and Obras y sewerage system.in a number of Servicios medium ·size cities and in a state Pub+icos water coipany, including technical (llAtlQBRAS) assistance for the. creation of the state water company. Naci.onal Up to FONEI V - Credit: for development Project preparation underway. Financier a 100.0 of export-oriented industries, (NAFiNSA) (Bank). NICARAGUA Ministry of To be (R) Education III - Extension and improve~ At the request of the.Govern- EducatiOif deter- ment of rural P.rimary education, ment, Project withdrawn from minecl. including adult literacy and skills Board consideration·. Re- (Bank) trainfog; appraisal tentatively scheduled for early 1982. Inst i tu.to. To be Expansion of ~nagua's water supply Preparation underway. Nicaraguense cl.eter- system. ·de Agua y mined Alcanta,;illados (Bank) (INAA) Fondo Up to Line of credit for agriculture. Appraisal report being prepar~d. Especial 20,0 Tota+ project cost estimated at de (Bank) $30.0 million of which $15,0 Desarrollo million· in foreigii exchange. (FED) Institute Up to (R) Stage II of Momotomba Geothermal Preparation underway'. Nicaraguense 25.0 Plant; distribution expansion de Energia (Bank) in several citi.es, training and (!NE) institutional improv 7ments. See page 1 for footnotes. - 75 - Member Country, and Borrower or Amount· & Stage of Process- Implement'ing Probable ing and Action on Agency l_/ Lender'!:_/ Procurement 4/ NICARAGUA (Cont'd) Junta Up to (R) Municipal Development - Storm drainage Board presentation scheduled de Recon- 16.b and low income neighborrood improve- for December 15. struccion (Bank) ment program for Managuf, and pilot de Managua national municipal deveiopment invest- Procurement: Retroactive financing (JRM) ment program through fihancing a muni- of up to $1 •.4 million proposed and Secretaria cipal fund to provide ctedit and after March.'1981 for storm drainage de Asuntos technical assist~nce to[secondary and protection work. Municipales cities for municipal improvement. (SAMU) Total project cost .estiihated at $22.8 million, of which $13.91million in foreign exchange. Ministry of To be Highways - To improve p oduction Preparation. underway. Transportation deter- 7 roads to all-weather status and mined ~"' ~,o,,oaoce •'"''~· (Bank) PANAMA Instituto de Up to (R) Water Supply and Sewerage II Appraisal mission tentatively Acueductos y 20.0 Improvement of systems ~n scheduled for December. Alcantarillados (Bank) Panama City, Colon, Chotrera and Nacionales Santiago; metering prog~am and (IDAAN) technical assistance. 1otal project cost estimated at $45 million of, which $20 million in forieign exchange. Autoridad Up to (R) I Improvements of the ports of Balboa, Negotiations tentatively Portuaria 19.0 Cristobal and Coco Solo J Total scheduled for December. Nacional (APN) (Bank) project cost estimate4 dt $33.6 mil- lion of which $20.3 mill.hon in foreign exchange. J Ins ti tu to Up to Fortuna II Hydroelectri Power. Schedulj_ng of appraisal mission de Recursos 25.0 is now dependent on resolution of Hidraulicos y (Bank) technical problem recently discovered Electrificacion in connection with Fortuna I project ;: (IRHE) which also affects'this project. (Co-financing may be required.) Corporacion 10.0 (R) Cerro Colorado Engineeripg Studies - Appraisal mission postponed de Desarrollo (Bank) Engineering and technica~ assistance pending Government decision. Minero (CODEMIN) for copper mining. I To be 15.0 Agricultural Credit - Inpluding Project preparation underway. deter- (Bank) tropical tree crops and livestock mined - development. PARAGUAY Ministry of 30.0 (R) Area development in Caazfpa Depart- Appraisal report being Agriculture (Bank) ment - Including agricultural reviewed. and Livestock credit, extension, reseafch, forest (MAG) management, soil conservJtion, health facilities and rural roads. Total project cost estimated at $53 million of which $32 million in foreign exchange. I Administracion 13.0 (R) Port.s II and Inland Waterways - Awaiting definition of project Nacional de · (Bank) Development of facilities in .scope by Government. Navegacion y Ports·of Asuncion and Villeta Puertas (ANNP) and improvement in riverways. See page 1 for footnotes. - 76 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency]:_/ Lender '!:._/ .!'._rocuremen t !:._/ PANAMA (Cont'd) To be Up to (R) Rural Development 111 - Integrated Appraisal report being prepared. determined 20,0 rural development in Eje Norte (Bank) (Chore and San Estanislao) benefit- ting about 12,000 farmers established in private and government settlements, Ministerio 45,0 (R) Highways VII - Construction of Appraisal report being prepared, de Obras (Bank) Tacuara-Santa Rosa road, Villarica - (Co-financing of project Publicas Numi road and reconstruction of San required.) Lorenzo-Eusebio Ayala road, Total project cost estimated at $123 mil- lion of which $82 million in foreign exchange. Institute de To be (R) Urban Development - Financing of Pre-appraisal mission scheduled Desarrollo deter- key investment (markets, bus for January, Municipal mined terminals, etc,) in municipalities (Bank) in Southeastern Paraguay, To be To be (R) Agricultural development - Agricul- Preparation will begin in deter- deter- tural extension, credit, research, December, mined mined health facilities,' and rural roads (Bank) in Southeastern Paraguay, Banco Agrario Up to Agricultural Credit VI - Medium- and Project preparation underway. del Peru 40,0 long-term credit for agricultural (Bank) development. (EMPRESA DE 40,0 (R) Lima Water Supply - Rehabilitation Appraisal report being prepared, SANEAMIENTO DE (Bank) and expansion of groundwater well (Co-financing for well' drilling· LIMA) (ESAL) sources, water metering services, of about $8 million is under ' and·water and sewerage systems in negotiation by ESAL,) Metropolitan Lima, Total project cost estimated at $90 million of Procurement: International which $45 million is foreign exchange; tenders are expected to be project includes technical assistance, ad~ertised by May 1982, Ministerio de Up to (R) ·Roads.VIII - Rehabilitation (195 km), Negotiations scheduled Transportes y 90,0 and improvement, including paving for November. Comunicaciones (Bank) (400 km). Total project cost estimated at $172 million of Procurement: Advance which $90 million in·foreign contracting may be used, exchange, · Ministry of 40,0 (R) Educati,on II - Primary education. Project preparation underway, Education (Bank) (CENTROMIN) Up to Mining II - CENTROMIN's 1981-84 Project preparation underway, 50,0 investment program, including expansion (Co-financing being sought.) (Bank) of polymetallic mines, improvement of CENTROMIN's refJnery facilities and infrastructure works, (CENTRAL 25,75 (R) Small Scale Industry - Industrial Negotiations completed, BANK) (Bank) credit for small scale industries, Total project cost estimated at $50 million of which $25 million in foreign exchange, See page 1 for footnotes, - 77 - Member Country, and Borrower or ·Amount & :stage of Process- Implementing Probable ing and Ae~iori on Agency Y Lender y Procurement 4/ PERU {Cont'd) Ministry Up to (R) First Health Project. - Construction Appraisal miss.ion scheduled for of 20.0 and improvement of primary health January. Health (Bank) c8re facilities in selected areas of Peru and technical assistance for the health sector. Petroleos Up to (R) Petroleum II - Primary and Secondary Appraisal mission in the del Peru 80.0 Recovery in the Talara Area. field. {PETROPERU) (Bank) To be Up to Urban Development II~ Construction Project. preyaration determined 60.0 of 'sites and services, public utility . und~rway. (Bank) connections, slum upgrading and supervised credit. Ministerio 25 .0 (R) Agricultural research and Appraisal· report being prepared. de Agricultura. (Bank) extension. (ELECTROPERU) 80.0 (R) Power VI - Distribution expansion· Appraisal report being prepared. {Bank) for Lima; engineering and bidding· (Co-financing beirig sought.) documents for'Mantaro water diversion, construction of Yuracmayo ·reserv:oir, and ~ngineering for Huinco, Salta Bajo,· and Mayush. To be To be Power VII.- 126 MW Yuncan hydro- Project preparation underway. determined deter- electric plant and distribution. mined (Bank)