E4367 Government of the Union of Myanmar Telecommunications Sector Reform Project Environmental and Social Management Framework (ESMF) Ministry of Communications and Information Technology (MCIT) November 29, 2013 Contents 1 INTRODUCTION 4 1.1 PROJECT OBJECTIVE 4 1.2 PROJECT DESCRIPTION 4 1.3 PROJECT IMPLEMENTATION AREAS 6 1.4 OBJECTIVE AND OUTLINE OF THE ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK 7 2 PROJECT LEGAL AND POLICY FRAMEWORK 8 2.1 NATIONAL LEGISLATION AND REGULATIONS 8 2.2 APPLICABLE WORLD BANK SAFEGUARD POLICIES 9 3 ANTICIPATED PROJECT IMPACT 11 3.1 GENERAL ENVIRONMENTAL IMPACTS DURING PRE-CONSTRUCTION/CONSTRUCTION STAGE 11 3.2 SOCIAL IMPACTS 11 3.3 POTENTIAL ENVIRONMENTAL AND SOCIAL IMPACTS AND PROPOSED MITIGATION MEASURES (TO BE CONSIDERED DURING ENVIRONMENTAL AND SOCIAL SCREENING OF PILOT AREAS DURING PROJECT IMPLEMENTATION) 13 3.4 OVERALL PROJECT POSITIVE IMPACTS AND SOCIO-ECONOMIC BENEFITS 18 4. ESMF PROCESS 18 4.1. ENVIRONMENTAL AND SOCIAL MANAGEMENT OBJECTIVE 18 4.2 PROPOSED SCREENING, REVIEW, APPRAISAL AND IMPLEMENTATION PROCESS OF PILOT AREAS 20 5. PROJECT IMPLEMENTATION ARRANGEMENTS 22 6. ENVIRONMENTAL AND SOCIAL MONITORING 24 6.1 ESMF RELATED BUDGET 24 6.2 CAPACITY BUILDING AND TECHNICAL ASSISTANCE REQUIREMENTS 25 7.0 PROJECT PUBLIC CONSULTATION AND DISCLOSURE PROCESS 26 7.1 PROPOSED PUBLIC CONSULTATION AND DISCLOSURE PLAN 26 8.0 CAPACITY BUILDING RECOMMENDATIONS 28 8.1 STRENGTHENING OF PROJECT CAPACITY FOR IMPLEMENTING THE ESMF 28 ANNEX 1: ENVIRONMENTAL AND SOCIAL SCREENING FORM 31 ANNEX 2: ENVIRONMENTAL CODE OF PRACTICE (ECOP) 35 ANNEX 3: LAND LEASE GUIDELINES 40 ANNEX 4: ETHNIC MINORITY PLANNING FRAMEWORK (EMPF) 46 ANNEX 5: APPRAISAL, APPROVAL AND MONITORING PROCESS FOR PILOTS THAT REQUIRE AN EMP 50 ANNEX 6: FORMAT OF AN ANNUAL ENVIRONMENTAL REPORT 52 ANNEX 7: CONTENT OF AN EMP 53 ANNEX 8: MINUTES OF PUBLIC CONSULTATIONS 60 1 INTRODUCTION 1.1 PROJECT OBJECTIVE The development objectives of the proposed Telecommunication Sector Reform Project (the Project) are to: (i) improve the enabling environment for the telecommunications sector and extend coverage in selected remote pilot locations; and (ii) establish priority eGovernment technological foundations and institutional capacity for Government to embark on its public sector reform program. 1.2 PROJECT DESCRIPTION The Project takes an integrated approach to the development of the Information and Communications Technologies (ICT) sector in Myanmar. It has three substantive and interrelated components. Creating the enabling policy, regulatory and legal environment will facilitate the establishment of a competitive telecommunications market and expansion of good quality and affordable communications in Myanmar while institutional reform of the government owned incumbent, Myanmar Post and Telecommunications (MPT) will enable separation of the policy and operational functions of Government in the sector, facilitating the establishment of a level playing field in the sector. The development of a Universal Service Strategy and implementation of telecommunication and internet services pilots will ensure the expansion of services to extremely remote communities. Finally, the establishment of key priority eGovernment foundations will allow for common technical horizontals/shared services that government agencies will have access to in order to facilitate the use of ICT for governance reforms and public sector modernization. Component 1: Creating an enabling environment for connectivity ($ 14.0 million) The Project will finance technical assistance and investments to support Ministry of Communications and Information Technology (MCIT) and Post and Telecommunications Department (PTD) in designing and implementing a policy and regulatory environment that establishes a pro-competitive sector. This component will focus on: (a) Technical assistance for addressing policy and regulatory bottlenecks to maximize the benefits of the sector reform agenda (US$ 2.00 million). (b) Institutional capacity strengthening for the Ministry and the regulator (US$ 1.5 million). (c) Spectrum management and monitoring system ($8.3 million). The regulator will be responsible for spectrum management and monitoring. Given that most new network deployments will rely on wireless technology, there is a need to support the strengthening of the regulator’s spectrum management function. The PTD will be provided investment support to procure and implement a spectrum management and monitoring system so that it has the tools to effectively manage the radio spectrum. (d) Restructuring of Myanmar Post and Telecommunications ($2.2 million). Technical assistance will be provided to implement MPT restructuring and convert it from the present Government agency into a limited liability company, registered under the Company's Act. No civil works are envisaged under Component 1. Component 2: Extending connectivity to rural areas ($10.65 million): This component will support the development of the Government’s Universal Service Strategy in order to accelerate the provision of telecommunications and internet services in remote areas of Myanmar. The support for this component will have two important impacts: (a) establish and institute a competitive and transparent process to involve the private sector in providing infrastructure access and services in rural and economically unviable areas of Myanmar; and (b) redefine public sector role from that of financing information and communications infrastructure development to one of facilitating private service provision of services. This component will be implemented over two phases: (a) In the first phase, technical assistance will be provided to conduct a detailed scoping of the Universal Access Program, a Universal Service Strategy (USS) will be designed, Universal Service Fund (USF) manual and USF implementation procedures will be developed, and pilots (both supply and demand side) and their location will be identified and designed for implementation. (b) In the second phase, the pilot program for telecommunication will be implemented in line with the USS recommendations especially in rural areas. This pilot program will target locations and investments that will be functionally independent of the investment programs that are being made by the newly licensed and existing operators. In other words, the pilot program will develop sub- systems which will not require any addition to or modification of the core networks which already exist or are being developed by operators independent of the project. Supply-side interventions will be primarily achieved through a competitive award of capital subsidies through an output-based aid, reverse tender process (with the subsidy being awarded to the lowest bidder) to licensed operators that would be responsible to provide telecommunication and internet services to rural areas of Myanmar that are commercially non-viable for operators to service without a one-time subsidy and limited demand side interventions to provide content and application services for rural communities. Pilot subprojects will help demonstrate how universal access can be provided to remote, rural communities that are commercially unviable for operators to extend services to on their own. The sites for these pilots will only be identified during implementation once the USS is prepared. The pilots will entail the extension of mobile network coverage to rural areas and will include the setting up of telecommunication towers/masts and relevant base stations. This will entail small- scale civil works for the establishment of communication towers foundations and affiliated facilities (access platform, pre-fabricated shelter, equipment, etc.) in line with technical requirements and design conditions for siting such communication infrastructure as well as in compliance with relevant regulations (e.g., radio frequency admissible levels). Component 3: Enabling eGovernment Foundations ($4.79M). This component aims to support the Government’s charter in governance reforms by improving transparency and accountability. It will provide: (i) Technical assistance and investment support to implement a mobile friendly Myanmar National Portal to provide citizens, businesses, and visitors (comprising of foreign workers, investors and tourists) with a single window into the information and services offered by the Government. Over time the National Portal will allow its users to find relevant information, provide suggestions and feedback, and transact services in a safe and convenient electronic environment. (ii) Capacity building support through : (a) a series of high-level eGovernment visioning exercises to expose politicians and senior civil servants to the value of eGovernment and how it supports the nation’s charter for accountability, transparency and progress; and (b) eGovernment capacity building for approximately 150 government employees. The government employees will be trained in conceptualizing, planning, managing and monitoring e-Government services. (iii) Technical assistance to establish a (eGovernment delivery unit, which will comprise of staff with project management, change management and technical skill sets to coordinate different aspects of implementing the eGovernment program. These component activities do not envisage any civil works or development of technical studies that will trigger civil works in the future. Project Implementation Support ($2.06 million). Project funds will be used to support the MCIT/PTD with project implementation support. A full-time Project Director will be appointed from the MCIT Government staff to implement the project effectively and efficiently. The project director will be a Government appointed staff. The project director will report to the Deputy Minister, MCIT and support MCIT to conduct implementation activities - including project management, co-ordination, procurement, financial management, monitoring and evaluation, safeguards and social impact assessments. Funds will also be used to procure required infrastructure and services to support the Project Director’s office as needed, including office equipment and vehicles. Operational costs of the project will also be met from this allocation. The Government’s in-kind contribution to the project will include office space and the salary of the Project Director. Project activities will be implemented over a five year period (2014 to 2019). 1.3 PROJECT IMPLEMENTATION AREAS The overall project investments will be implemented in Nay Pyi Taw and Yangon cities and surroundings. Specific safeguards analysis will be linked primarily to Component 2 Extension of the connectivity to rural areas which includes both civil works (i.e. construction of towers, masts and substations) and consultancy services (e.g., design of bidding documents). The exact details of the rural pilot locations will be confirmed during project implementation under the second phase of the component. Given that the sites for the pilots will not be identified by appraisal and specific site characteristics will be known only during project implementation (second phase under component 2), the preparation of an Environmental and Social Management Framework (ESMF) is the tool required to describe the baseline project environmental conditions and impact, and to provide guidance for environmental and social assessment processes to be undertaken during project implementation once the respective technical details are available (e.g., principles, rules and procedures to screen, assess, manage and monitor the mitigation measures of possible project environmental and social impacts). All Project sites where telecommunication masts/ towers will be installed to extend connectivity will be selected in line with the provisions of the final Environmental and Social Management Framework (ESMF). 1.4 OBJECTIVE AND OUTLINE OF THE ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK The objective of this ESMF is to ensure that the implementation of the project is carried out in an environmentally and socially sustainable manner. The ESMF aims to provide clear guidance and mitigation measures, so as to avoid, manage or minimize potentially negative environmental and social impacts associated with project activities, specifically to:  Identify and assess the potential impact of the proposed Project on environment, land tenure and use, livelihood and income, and ethnic minorities;  Clarify concrete steps and clear principles to mitigate negative environmental and social impacts, and enhance positive benefits;  Specify appropriate roles and responsibilities of concerned entities in charge of environmental and social risk management, and outline the necessary reporting procedures, and  Establish clear directives and methodologies for the environmental and social screening of the pilots to be financed under Component 2 of the project. This ESMF will form a part of all bidding documents under Component 2 of the project. The frameworks will include criteria for the selection of sites for the construction activities of the project and for the design of environmental and social impact mitigation measures. The proposed project does not envisage significant and irreversible adverse impacts on the environment and community. The identified adverse impacts are localized in spatial extent and short in duration and are manageable by implementing mitigation measures detailed in the ESMF. This Environment and Social Management Framework was developed as a standalone document to meet WB’s safeguard requirements consistent with the issues identified during project preparation. It also includes the Environmental Codes of Practice (ECOP), Ethnic Minority Planning Framework (EMPF) and Land Lease Guidelines. This ESMF and the ECOPs will form a part of all bidding documents issued under Component 2 (second phase) of the project. 2 PROJECT LEGAL AND POLICY FRAMEWORK 2.1 NATIONAL LEGISLATION AND REGULATIONS Environment An environmental law became effective on March 30, 2012 but relevant regulations and standards have not yet been issued. The Government is updating and revising the Environmental Impact Assessment (EIA) rules and regulations (part of Myanmar Agenda 21 developed in 1999), including public disclosure and consultation. There are also other laws with environmental policy implications such as the 1992 Forest Law, the 1995 Forest Policy, the 1994 Protection of Wildlife and Wild Plant and Conservation of National Areas Law, several water and river laws as well as a number of international laws and conventions that Myanmar has ratified. The National Sustainable Development Strategy (NSDS) was prepared in 2009 including three goals: (i) sustainable management of natural resources; (ii) integrated economic development and (iii) sustainable social development. Currently, the Government is embarking on a new development stage to strengthen the principles and mechanisms of this strategy and the need for monitoring and evaluation considering economic, environmental and social perspective. One of the Government main priorities is to mainstream sustainable environmental considerations into national development planning and to develop an effective safeguards system to prevent the social and environmental impacts associated with rapid economic growth. Land Laws. Myanmar does not have a unitary land law but has several laws for different categories of land. All land belongs to the state under the current legal system, and land users receive certificates from the Settlement Land Records Department. The Land Acquisition Act (1894) gives the state the right to acquire land for public purposes, outlines procedures for valuing land and lodging objections to acquisition. It also contains a requirement for landowners to be provided compensation for such land, though historically this has been inconsistently applied. When private land is acquired or private assets such as trees and standing crops are lost under public or private projects, compensation is paid at market value. The Act also provides that affected people with complaints can bring the case to court. A new Farmland Law was recently adopted which introduced various reforms such as the recognition that farmland owners are able to sell, mortgage, lease, exchange, inherit or donate all or part of their farmland. There is also the requirement that compensation be paid for both land and buildings attached to it. As for non-agricultural land in rural areas, the Village and Town Act is under revision. The Vacant, Fallow and Virgin Land Management Law, which was recently adopted, defines legal provisions on unused land. Ethnic Minorities. There is no specific law governing ethnic minorities. The Ministry of Immigration and Population is the agency responsible for data and issues on ethnic minorities. Clear provisions on the rights and access to properties especially for ethnic minorities have not been defined. Myanmar is one of the most ethnically diverse countries in the region. Officially, there are 135 recognized ethnic minorities. About 69 percent of the country’s inhabitants are Bamar, while the remainder is made up of ethnic minorities, among whom the Shan are the numerically largest group (8.5 percent), followed by the Karen (6.2 percent); Rakhine (4.5 percent), Mon (2.4 percent), Chin (2.2 percent), Kachin (1.4 percent) and Kayah (0.4 percent). Shan State occupies the largest geographical area. Some ethnic minorities have linguistic and cultural affiliations with neighboring countries, others with the majority Bamar. For instance, Shan people speak Shan dialects which are related to Laotian and Thai; whereas Karen people speak a variety of Tibeto-Burman languages. The Rakhine are ethnically related to the Bamar but are culturally different, whereas the Mon people are ethno-linguistically related to Khmer. Telecommunications. The Telecommunications Law became effective on October 8, 2013. It makes provision for the establishment of a Universal Service Fund (USF) to implement Universal Service activities. Licensed Operators will make contributions (a percentage of adjusted revenues) to the USF. 2.2 APPLICABLE WORLD BANK SAFEGUARD POLICIES In accordance with the World Bank's safeguard policies and procedures (OP/BP 4.01), the overall proposed Project is considered Environmental Assessment (EA) category “B� due to anticipated, well known, low risks associated with the type of physical infrastructure proposed under Component 2 of this project. The implementation of Component 2 may create limited negative impacts on local environment and communities during the construction phase in locations that are currently unknown and thus, it triggers the World Bank (WB) safeguard policies on Environmental Assessment (OP 4.01); Natural Habitats (OP 4.04); Indigenous Peoples (OP 4.10); Physical Cultural Resources (OP4.11) and Involuntary Resettlement (OP 4.12). The potential application of these safeguards will be screened again during project implementation, prior to rolling-out of the pilots, at each proposed site where towers/masts will be installed and if likely to be triggered appropriate mitigation measures and monitoring of their implementation will be carried out in line with provisions defined in the final Environment and Social Management Framework (ESMF). OP 4.01 on Environmental Assessment is triggered for this project since Component 2 will entail limited small scale civil works related to the construction of telecommunication towers. Potential but temporary negative impacts on local environment and communities will mainly occur during the construction phases of this Project; the nature of the proposed construction works although at different sites (not identified yet) will include similar activities, with an extent of impacts during construction that can be readily and consistently assessed and mitigated. The selection of sites will be screened for environmental and social criteria based on an Environmental and Social Screening Form (Annex 1) before decision on the actual location is made and works to install the respective towers may commence. To mitigate the potential negative impacts during construction, Environmental Codes of Practices (ECOPs) (Annex 2) will outline requirements for mitigation measures and monitoring aspects to be carried out during construction and operation and maintenance. This Environmental and Social Screening Form, will be incorporated in the bidding documents for all works financed under this Project. OP 4.04 on Natural Habitats is triggered as a precautionary approach at this project stage since specific locations of project sites have not been yet identified and related civil works might have potential to impact existing natural habitats. The ESMF includes screening procedure to (i) determine whether the proposed site for towers installation is in a critical or non-critical natural habitat and (ii) avoid any significant conversion or degradation of any critical natural habitat. Sites with critical natural habitats that could be adversely affected by the installation of masts/ towers will be avoided, whereas installation of masts and towers may be allowed in natural habitats provided that the benefits outweigh the negative impacts of these towers’ installation and operation and that mitigation measures are developed and implemented to address possible impacts. OP 4.10 on Indigenous People is triggered for this project since Component 2 may be implemented in areas where ethnic minorities are present. If ethnic minorities are found to be present in pilot areas, private providers that implement the pilot will carry out free, prior and informed consultations with ethnic minorities and ascertain their broad community support. The nature of impact on ethnic minorities, if present in pilot areas will be positive as the project will allow their low cost access to ICT services. An Ethnic Minority Planning Framework (Annex 4) is developed and attached to this ESMF to provide procedures for ethnic minorities screening, consultations and guidelines for development of simple Ethnic Minority Plan that will be prepared by private developers before works may commence. OP4.11 on Physical Cultural Resources is triggered given the unknown location of the pilot areas. However, it is unlikely that the masts /towers will be located in areas with and/or will negatively affect Physical Cultural Resources (PCRs). Nevertheless, the ESMF includes provisions for screening of PCRs during site selection and before installation of masts /towers is allowed. This will include an investigation and inventory of physical cultural resources likely to be affected, documentation of the characteristics and significance of such resources, and brief assessment of the nature and extent of the impact. In addition, the ESMF includes provisions for Chance Finds during installation of masts /towers. OP 4.12 on Involuntary Resettlement is triggered although physical relocation of households or involuntary land acquisition will not occur under the project. Telecommunications operators will make a long-term lease contracts with land owners/ users on a commercial basis. The government will not be involved in or provide any support to the service providers in securing land; the role of the government in this project on matters related to land acquisition is limited to establishing clear procedures for commercial based land leasing, helping land owners/ users fully understand lease contracts and ensuring that no one with legal or recognizable rights to the leased land would lose significant livelihood as a result of the pilot. Recognizing that land markets is poorly developed and there are few or no experiences with land leasing arrangements for telecommunications towers and masts in Myanmar, principles for such arrangements have been developed under this ESMF, in the Land Lease Guidelines, to verify that all land leases are carried out with appropriate arrangements and on a commercial basis, without coercion or under duress. Detailed steps to review and clear land leasing processes are developed and described in this ESMF (Annex 3). These precautionary steps are considered appropriate because tenure rights are rapidly evolving in rural Myanmar. Additionally, the ESMF provides steps to be taken to verify that there is no legacy issue in any land transactions regarding the leasing of land to be carried out in association with the project. 3 ANTICIPATED PROJECT IMPACT It is anticipated that temporary negative impacts may occur under the “extending rural connectivity� component. The potential impacts are associated with the installation of the towers/masts and base stations for mobile services in rural areas. The general known and predictable impacts and mitigation measures envisaged during construction stage are highlighted below while the provisions for possible impacts and relevant mitigation measures anticipated during project sites screening for environmental and social criteria are presented in Section 3.3 below. 3.1 GENERAL ENVIRONMENTAL IMPACTS DURING PRE-CONSTRUCTION/CONSTRUCTION STAGE Potential negatives impacts of the Project activities are expected to be mainly due to construction activities, such as dust and noise.. Vegetation and other natural environmental features: Efforts should be made to reduce impact of any environmental features and infrastructure facilities typically existing along the routes (e.g. drainage channels, culverts, utilities, community or commercial facilities, stores, bridge crossings, etc). This should be conducted by work contractors in coordination with local community groups and supervised by the service providers and MCIT. Any suggestions from community groups should be assessed and incorporated to the extent possible before works may commence. Temporary Detour of Access: Temporary detours of access are envisaged during works. Several mitigation measures will be undertaken, including (a) close management and proper scheduling of construction activities to minimize the duration of temporary disruption; (b) advanced information session with local residents; (c) providing information for alternative access paths and detours. Noise and Dust Emissions during construction: The operator will be required to take actions to mitigate these impacts as it is their responsibility included in the construction contract. Mitigation measures should consider limiting construction time during the day (from 08:00 to 18:00) and apply dust control measures (water sprays) at construction sites. Added precautions will be adopted in the vicinity of schools and hospitals. To facilitate effective implementation of the mitigation during construction, Environmental Code of Practices (ECOPs) have been prepared and details are provided in Annex 2. During the operation of the rural connectivity component, backup power systems consisting of a combination of batteries (typically lead-acid batteries) and diesel-fueled electricity backup generators may be required. Operations and maintenance activities may also result in the generation of electronic wastes such as nickel cadmium batteries and printed circuit boards from computer and other electronic equipment as well as backup power batteries. This e-waste will need to be temporarily stored properly (avoiding direct contact with soil, water, people) and discarded as hazardous waste in special designated landfills. 3.2 SOCIAL IMPACTS Land issues Competitively selected service providers will receive capital subsidies under Component2 and build small infrastructure such as towers, masts and equipment shelters to extend connectivity to commercially unviable rural areas. Such pilot schemes will be functionally independent of the investment programs that are being made by the newly licensed and existing operators. In other words, the pilot program will develop sub-systems which will not require any addition to or modification of the core networks which already exist or are being developed by operators independent of the project. The service providers are expected to make a long-term lease contract on a commercial basis with willing land owners/ occupants when building such infrastructure. No- one will be forced or coerced into a leasing arrangement. It is not anticipated that more than 100m2 of land will be needed for each lease. No physical relocation of households will occur under the pilot – if field inspections find that the implementation of civil works in originally identified area requires physical relocation, alternative sites would be identified that would not require physical relocation. Where service providers cannot agree with land owners on terms of land lease, they will identify alternative sites to house the needed infrastructure where lease contracts can be agreed on a willing-seller willing-buyer basis. The government will not exercise power of eminent domain to assist service providers secure land. Land tenure is not fully established in rural Myanmar and rural population may have informal claims to the land where service providers plan to build infrastructure. For example, titles may have been given to land which has been traditionally used by local people for farming, collection of non-timber forest products, and other livelihood activities. Care should be exercised to clarify if indigenous claims exist to lands identified to house infrastructure and whether any individuals use the land to gain livelihood, before a decision is made to determine where infrastructure should be built. Communities will be asked during the community outreach about existing land use and indigenous tenure rights. If it is found that multiple, conflicting claims exist to the land where infrastructure is planned to be built and any third party will be affected by the lease, the service providers will be instructed to explore alternative sites to house infrastructure where no such conflicting claims exist. Indigenous Peoples Ethnic minorities in pilot areas where Component 2 will be implemented will benefit from the improved access to ICT services, however, the extension of ICT connectivity to indigenous peoples’ territories may constitute a risk for the customs and cultural traditions of these populations. Also, towers, masts and other physical infrastructure may plan to be built in areas of cultural or spiritual significance, or where ethnic minorities use for livelihood. In order to address such potential risks, ethnic screening will be carried out by the MCIT environmental and social specialist, in consultation with the Bank task team, to determine if ethnic minorities are present in pilot areas including but not limited to where infrastructure is built. If ethnic minorities are found to be present, free, prior and informed consultations will be carried out with them, and their broad community support to pilot projects will be ascertained. The Ethnic Minority Plan (EM Plan) with the scope and content commensurate to the sub-project's impact on ethnic minorities will be developed by the service providers which include a simple social assessment which will be conducted as part of consultation meetings, feedback obtained at consultations, any negative impacts that are found to result from the pilot and measures to mitigate them. In particular, potential issues related to land tenure and usage will be assessed and issues found will be addressed in the EM Plan. The service providers will also ensure, and clarify in the EM Plan, that the construction projects and the presence of workers in the territory of ethnic minorities will not affect their customs, lifestyle and livelihood of ethnic minorities 3.3 POTENTIAL ENVIRONMENTAL AND SOCIAL IMPACTS AND PROPOSED MITIGATION MEASURES (TO BE CONSIDERED DURING ENVIRONMENTAL AND SOCIAL SCREENING OF PILOT AREAS DURING PROJECT IMPLEMENTATION) Issue Potential Impacts Mitigation Measures Terrestrial Terrestrial and aquatic habitats may be altered during Recommended measures to prevent and control impacts to terrestrial habitats during construction habitat the construction of communications infrastructure of the right-of-way alteration depending on the type of infrastructure component and include: proposed location. Potential impacts to habitat may be  Avoid construction activities during the breeding season and other sensitive seasons or times more significant during construction and installation of of day; towers in previously undeveloped land.  Re-vegetate disturbed areas with native plant species; and  Manage construction site activities as described in relevant sections of World Bank Group’s General EHS Guidelines. Migratory The height of some radio transmission towers can pose Recommended prevention and control measures to minimize avian collisions include: birds potentially fatal risk to birds, mainly through collisions.  Siting towers to avoid critical habitats such as nesting grounds, heronries, rookeries, foraging The likelihood of avian collisions is thought to increase corridors, and migration corridors; with the height and design of the communications tower  Avoiding the cumulative impact of towers by co-locating antennae on existing towers or other (e.g., guyed towers represent a higher potential for fixed structures (especially cellular telephone communication antennae), designing new collisions); the presence of tower lighting (attracts some towers structurally and electrically to accommodate future users, and removing towers no species of birds at night or during low light conditions); longer in use; and, most importantly, the tower location with regard to  To the extent feasible, limiting tower height and giving preference to non-guyed tower flyways or migration corridors. construction designs (e.g., using lattice structures or monopoles);  If guy wired towers are located near critical bird habitats or migratory routes, installing visibility enhancement objects such as marker balls, bird deterrents, or diverters on the guy wires; and  Limiting the placement and intensity of tower lighting systems to those required to address aviation safety. Issue Potential Impacts Mitigation Measures Visual The visual impacts of tower and antennae equipment Recommendations to prevent, minimize, and control visual impacts include: impacts may depend on the perception of the local community  Minimizing construction of additional towers through co-location of proposed antennae in as well as the aesthetic value assigned to the scenery existing towers or existing structures such as buildings or power transmission towers; (e.g., scenic and tourism areas).  Use of tower and antennae camouflaging or disguising alternatives such as masts or towers designed to look like trees; and  Taking into account public perception about aesthetic issues by consulting with the local community during the siting process of antenna towers. Hazardous Telecommunications processes do not normally require Recommended hazardous materials management actions include: materials the use of significant amounts of hazardous materials.  Implementing fuel delivery procedures and spill prevention and control plans applicable to the and waste However, the operation of certain types of switching delivery and storage of fuel for backup electric power systems, preferably providing and transmitting equipment may require the use of secondary containment and overfill prevention for fuel storage tanks; backup power systems consisting of a combination of  Implementing procedures for the management and disposal of lead acid batteries, including batteries (typically lead-acid batteries) and diesel-fueled temporary storage, transport, and final disposal. Lead-acid batteries should be managed as a electricity backup generators. Operations and hazardous waste as described in the World Bank Group’s General EHS Guidelines; and maintenance activities may also result in the generation  Purchasing electronic equipment that meets international phase-out requirements for of electronic wastes such as nickel cadmium batteries hazardous materials content and implementing procedures for the management of waste from and printed circuit boards from computer and other existing equipment according to the hazardous waste guidance in the World Bank Group’s electronic equipment as well as backup power batteries. General EHS Guidelines. Air Emissions from telecommunications projects may be Recommended management actions to minimize emissions include: Emissions primarily associated with the operation of vehicle fleets,  Implementation of vehicle fleet and power generator emissions management strategies as use of backup power generators, and use of cooling and described in the World Bank Group’s EHS Guidelines and avoiding the use of backup power fire suppression systems. generators as a permanent power source, if feasible; and  Ensuring that fire suppression systems use ozone-friendly technology. Noise The principal source of noise in telecommunications Recommended noise management action includes the use of noise suppression shields and facilities is associated with the operation of backup mufflers as well as the location of noise generating sources away from residential or other noise power generators. sensitive receptors to meet the noise emissions levels provided in the World Bank Group’s General EHS Guidelines. Issue Potential Impacts Mitigation Measures Electric Electric and magnetic fields (EMF) are invisible lines Recommendations applicable to the management of EMF exposures include: and of force emitted by and surrounding any electrical Magnetic device, such as power lines and electrical equipment.  Evaluating potential exposure to the public against the reference levels developed by the fields Electric fields are produced by voltage and increase in International Commission on Non- Ionizing Radiation Protection (ICNIRP); strength as the voltage increases. Magnetic fields result  Average and peak exposure levels should remain below the ICNIRP recommendation for from the flow of electric current and increase in General Public Exposure; strength as the current increases. Radio waves and  Limiting public access to antennae tower locations; microwaves emitted by transmitting antennas are one  Following good engineering practice in the siting and installation of directional links (e.g., form of electromagnetic energy. Radio wave strength is microwave links) to avoid building structures; and generally much greater from radio and television  Taking into account public perception about EMF issues by consulting with the local broadcast stations than from cellular phone community during the siting process of antenna towers. communication base transceiver stations. Microwave and satellite system antennas transmit and receive highly concentrated directional beams at even higher power levels. Although there is public and scientific concern over the potential health effects associated with exposure to EMF (not only high-voltage power lines and substations or radio frequency transmissions systems, but also from everyday household uses of electricity),there is no empirical data demonstrating adverse health effects from exposure to typical EMF levels from power transmissions lines and equipment. However, while the evidence of adverse health risks is weak, it is still sufficient to warrant limited concern Issue Potential Impacts Mitigation Measures Land Involuntary land acquisition or physical relocation of Clear steps and procedures are provided in this ESMF (see Land Lease Guidelines, Annex 3) to people will not occur under the project. Service ensure that service providers and land owners/ users enter into long-term lease contracts on a providers under Component 2 will secure land to house willing-seller willing-buyer basis. Land use will be screened with the participation of community towers, masts and equipment shelters based on a long- members so only those lands where multiple, conflicting claims, formal or informal, do not exist term lease contract with land owners/ users on a and the third party will not be affected by the lease will be selected to house infrastructure to be commercial and willing-buyer, willing-seller basis. It is built under the project. Lease agreements will be made with land owners/ users based on a not anticipated that more than 100m2 of land would be willing-seller willing buyer basis. Power of eminent domain will not be exercised. Service needed for one lease. No civil works that require providers will put in place feedback mechanisms through which people can submit grievance. physical relocation of households will be allowed. Compliance with the requirements in ESMF will be monitored by the Bank task team. Land tenure is not fully established in rural Myanmar If land owners/ users are unwilling to lease land or complex tenure/ use issues are observed, and rural population may have informal claims to the service providers should identify alternative land to house infrastructure where no such issues land where service providers plan to build exist. Whether local people lose access to land where they collect natural resources for livelihood infrastructure. will be assessed. Indigenous The extension of ICT connectivity to ethnic minorities’ Ethnic Minority Planning Framework (Annex 4) is developed and attached to this ESMF, which Communiti territories could pose a risk to their traditional culture provides: es and practices, tenure rights and livelihood.  Ethnic screening will be carried out to identify if ethnic minorities are present in or have Infrastructure may be built in areas with traditional or collective attachment to areas where pilot activities will be implemented. spiritual significance to ethnic minorities or where they  Free, prior and informed consultations will be carried out with affected ethnic minorities; derive livelihood. Construction works and the presence  The Ethnic Minority Plan will be developed which includes a simple social assessment, of foreign workers in their territories could affect their results of consultations, negative impacts of pilot activities and mitigating measures; and lifestyles and customs and cause subsequent identity  Measures to ensure that the construction projects and the presence of workers in the territory loss. of ethnic minorities will not affect their customs, lifestyle and livelihood. Issue Potential Impacts Mitigation Measures Physical During construction works, physical cultural resources Towers should not be constructed on sites with high probability of existing critical archaeological Cultural findings may be encountered and potentially damaged findings or other physical resources of cultural value; Resources or broken. Culturally sensitive areas (i.e., where findings physical cultural resources practices occur) may  Assess and document the potential for existence of physical cultural resources during site become affected both by construction and operation selection; works, by modifying the religious or cultural value of a  If physical cultural resources may be lost, implement full site protection and develop a certain area. management plan that includes actions to mitigate adverse impacts; provisions for the treatment of cultural properties discovered during implementation and operation; monitoring system to track progress during the implementation phase;  Make provisions for managing chance finds, salvage, and documentation;  In other sensitive sites, have experts supervise construction works;  Stop work for removal in case PCR findings are encountered and immediately report to supervisor for coordination with expert from local cultural heritage authority;  Train personnel to recognize PCR findings and notify supervisor;  Control access to site where PCR finding occurs through proper warning signs;  Reinforce the non-eligibility criteria Public Communities may be exposed to structural safety risks Recommended mitigation measures to minimize risks to the surrounding communities: Safety in the event of structural failure of masts or towers, especially in vulnerable areas such as those prone to  Assess risk of erosion during design development and site selection (i.e., soil characteristics, earthquakes, flooding, or landslides. topography, climate, etc.);  Do not site towers in areas with high risk of natural disasters:(landslides, earthquakes, flooding, or slopes >30º);  If location in residential area is necessary, respect the required distance between mast and closest residential building; and Design and install tower structures and components according to good international industry practice. 3.4 OVERALL PROJECT POSITIVE IMPACTS AND SOCIO-ECONOMIC BENEFITS Telecommunications plays a major role in economic, social, and cultural growth and development. The Project is expected to lead to substantial social benefits and expected to benefit both male and female population as well as minors. The main social impacts of the project are the increased possibility of better access to ICT services for the population and improved government service delivery. The project will: (a) enable cheaper and more widespread access to telecommunications and internet services across Myanmar; (b) enable direct and indirect improvements in overall public sector service delivery because the project will reduce the costs of interacting with the Government and improve the efficiency of Government operations translating into increased number of eServices available online; (c) reduce isolation and enhance economic activities in rural areas; and (d) enlarge participation of private IT companies—in particular, small- and medium- sized enterprises in the development of the telecommunications sector and creation of applications for the Government. In terms of other benefits, the project will encourage site sharing and co- location by many operators, so that the number of tower infrastructure being built out across the country is not duplicated. Moreover, integration of environmental provisions in the Project design can also result in environmental conservation benefits through:  proper recycling of waste materials;  promotion of sustainable investments in new technology that do not contain hazardous materials; and  Environmental awareness and public consultation regarding the use of local material supply and management in a sustainable manner. 4. ESMF PROCESS This section outlines the screening, review, and approval process for activities to be financed under the “Extending Rural Connectivity� Component of the project. As the locations for the pilots are not clearly identified at this stage, it is important to have the appropriate tools in place to assist the project’s implementing agency, MCIT, in screening these activities for potential impacts and to provide guidelines for implementing measures to effectively address them. Once the pilots have been identified and locations selected, the MCIT should use this section as the guideline to screening pilots and implementing the appropriate measures while ensuring adherence to all respective legislative requirements for screening and all the provisions provided in this document. 4.1. ENVIRONMENTAL AND SOCIAL MANAGEMENT OBJECTIVE The main objective of the ESMF is to ensure that the pilot activities to be financed under the Project would not create adverse impacts to the local environment and residents and that the unavoidable impacts will be adequately mitigated in line with the applicable WB’s safeguard policies. The ESMF has been designed to comprise the following key steps: (1) safeguard screening and impacts assessment through site surveys of project areas, including taking in consideration extensive consultation sessions with stakeholders and residents in each pilot project areas; (2) preparation of mitigation measures and documentation (ECOPs; Land Lease Guidelines; Ethnic Minority Planning Framework); and (3) implementation, monitoring, and reporting. The environmental and social safeguard screening, impact assessment, and preparation of site specific ECOPs or EMPs (following formats provided in the Annexes) under Component 2 will be carried out during Project implementation and will be submitted for WB clearance before their approval and implementation. An Ethnic Minority Plan should be reviewed and cleared by the WB before the pilot for which the EM Plan is developed is approved for implementation, and the first 10 land lease contracts should also be reviewed and cleared by the WB before the civil works which requires the land lease are allowed to start. It should be noted that all chosen investments would have to meet the selection criteria as specified in the final ESMF in order for the ESMF and ECOPs to apply. If any pilots selected for investment do not meet the selection criteria, additional safeguard documents such as Environmental Management Plan (EMP) may be required. World Bank team shall be consulted where necessary timely before approval of sites. The assessment and verification of land leasing, and free, prior and informed consultation with ethnic minorities will also be carried out as part of the ESMF process. Detailed step by step procedures to be followed on such social issues are provided in Annexes 3 and 4. The following section illustrates the process to be undertaken for screening and review of pilots under the “Extending Rural Connectivity� component. 4.2 PROPOSED SCREENING, REVIEW, APPRAISAL AND IMPLEMENTATION PROCESS OF PILOT AREAS Pilot Appraisal Process Corresponding Safeguard Requirements  Ethnic screening and risk determination (low, medium or high – if risks are rated high, alternative pilot sites will Step 1. Pilot identification be identified) Pilot Screening  Community outreach, consultations with ethnic minorities (if present)  Site inspection and determination of functional independence of pilot scheme  Risk screening Pilot appraisal Step 2. Impact Low risk Medium risk Assessment  Develop generic mitigation and monitoring measures for  Develop and implement EMP for pilot pilot (use Annex 2)  Apply environmental conditions in contract agreements  Apply environmental conditions in contract agreements  Develop Ethnic Minority Plan (per Annex 4)  Verify absence of ethnic minorities through public outreach,  Carry out field appraisal to verify the voluntary will of land or proceed as per EMPF if their presence is found owners, assess land tenure, land use and other issues per  Develop lease agreements and narrative reports Annex 3, and (i) verify lease agreements , or (ii) suggest  Carry out desk and field appraisal and (i) verify lease Service Providers to revise lease agreement or explore agreements, or suggest Service Providers to revise lease alternative sites agreement or explore alternative sites; (ii) verify information  Confirm broad community support of ethnic minorities to provided in Ethnic Minority Plan and EM’s broad community pilot activities and adequacy of mitigation measures to support to pilot activities. negative impacts through field appraisal Pilot approval Step 3. Low risk Medium risk Environmental  EMP reviewed by local environmental and social specialist  EMP and Ethnic Minority Plan reviewed by MCIT and Social and the Bank environmental and social specialist and the Bank review  First 10 lease agreements should be reviewed and cleared  First 10 lease agreements should be reviewed and cleared by MCIT and the Bank by MICT and the Bank  Pilot approved on basis of review findings  Pilot approved on basis of review findings Pilot Implementation Step 4  Implement mitigation measures under the ECOP/EMP for pilots (see Annex 2, 5 and 7) Pilot implementation  Post review of randomly selected lease agreements by the Bank  Provide monitoring reports (by-annually) (see Annex 6) Step 5  Monitor environmental and social compliance and ECOP/EMP implementation (see Annex 7) Environmental and  Carry out annual environmental and social audit for pilots and provide reports to the Bank as required Pilot monitoring Social monitoring  Monitor implementation of Ethnic Minority Plans  Monthly site visits by safeguard focal point of Service providers for the first six months of pilot implementation DRAFT 20 MYANMAR TELECOMMUNICATIONS SECTOR REFORM PROJECT (a) Screening of pilot activities. Once the pilot activity is defined and the location selected, environmental and social risk assessment will be carried out as provided in the figure above and a screening form will need to be filled out by the Service Provider. Different actions will be taken on social issues based on the risk assessment. The screening form will allow for identification of the potential environmental and social impacts associated with the proposed activity. As the ESMF should be utilized in tandem, the Screening Form will also allow for the identification and assessment of impacts related to potential environment and social impacts. A template for Screening is provided in Annex 1. Regarding screening processes for land leasing and ethnic minority issues see Annex 3 and 4 for more details. Alternative pilot sites have to be identified if (i) risks levels are rated high, (ii) the functional independence of the pilot is not confirmed based onsite inspections, and/ or (iii) ethnic minorities in pilot areas do not provide broad community support to pilot activities. Also, if the site inspection and screening find that local people have to physically relocate to build infrastructure, and/or multiple claims exist to the land where infrastructure is planned to be built and third party will be affected by the lease, alternative sites should be identified where no physical relocation is necessary and/ or complex claims to land exist is required. (b) Desk and field appraisal: The Service provider will develop Land Lease Agreements and negotiate with affected land owners/ users. Based on the information provided in the Screening Form, the reviewer at the MCIT will decide as to whether the pilot will require a more detailed investigation of the environmental impacts through a field appraisal. On social issues, field appraisal is required to verify land lease agreements. Data gathering will be achieved through observation and use of professional expertise; in some cases, interviews with local people could provide information regarding human use values and/or environmental significance. Approach to be taken for the field appraisal will differ between environmental issues, land leasing issues and ethnic minority issues. The ESMF Annexes provide specific steps to be taken. As part of the field appraisal, the Service Provider shall identify the major stakeholders/community groups within the impacted area that are likely to be affected. A list of potentially affected groups will be compiled and appended to the appraisal report. (c) Assessment and classification of impacts Based on the Screening Form (Annex 1) and field appraisal (when required), the impacts are classified based on their risk category and a decision is made as to whether the pilot will require: 1. only an EMP (see Annex 5 and 7 for content)/ECOPs (see Annex 2), since the impacts are not significant and can be easily addressed through the implementation of a mitigation and monitoring plan during construction and operation of the pilot; and/or 2. Ethnic Minority Plan, since ethnic minorities are present in areas covered under the “extending rural connectivity� pilot and/ or where infrastructure is built; and/or 3. Lease agreements, as was originally negotiated or under modification (if they are found not to be solid, and/or alternative sites should be identified due to unresolved conflicting claims to land or significant livelihood loss of indigenous users of the lease land), because private land has to be acquired to house infrastructure. 21 5. PROJECT IMPLEMENTATION ARRANGEMENTS The Project will be set up, managed and implemented by the Government of the Union of Myanmar through the Ministry of Communications and IT (MCIT). High-level management of the project and strategic policy guidance in its implementation will be provided by a Project Steering Committee (PSC), headed by the Minister, MCIT, and comprises the Deputy Ministers, Director General of PTD, and representatives from the Ministry of Finance and Foreign Economic Relations Department (FERD). The PSC will provide strategic guidance to the project and will meet quarterly (at least) to facilitate coordination, provide overall policy guidance, and review progress reports. Consultants will work closely with officials in MCIT (office of Deputy Minister) and PTD and will report to the Project Director, who will be a full-time Government staff of the MCIT. The MCIT will be responsible for the project, including coordination of the overall implementation, results monitoring, financial management, procurement, and reporting to and communicating with the Bank. The Project Director, with support initially from the PTD’s Finance Department, will maintain the project accounts, request and receive disbursements, conduct procurement, sign contracts, make payments, and carry out the financial management functions. The Project Director will work with staff from MCIT and PTD to develop all technical inputs such as relevant terms of reference and technical specifications. As and when needed, Technical Working Groups will be set up to deal with specific tasks related either to the development of terms of reference/technical specifications or elicitation and verification of user requirements related to the development of the IT systems. The MCIT will hire a Safeguards Specialist to support the function for the project. MCIT staff will also receive training and guidance from World Bank safeguard specialists during project implementation. The Service Provider is a licensed telecommunications operator in Myanmar. The Service Provider will be responsible for providing telecommunication services as per its license across Myanmar. For purposes of the pilot projects, the Service Provider is that licensed operator who wins the contract (and the capital subsidy) to provide telecommunication services in remote, rural pilot project areas. The Service Provider will have to adhere to its license terms and conditions and for purposes of each pilot site, to the contract signed with the MCIT, upon being awarded the capital subsidies for providing services in the pilot area. The Service Provider will appoint an Environmental and Social Focal Point who will assume the primary responsibility for the overall planning and implementation of environmental and social issues under the project. S/he will represent the Service Provider and ensure all project activities are implemented in line with good environmental and social risk management, and that the Component 2 will be implemented in line with this ESMF. S/he will maintain close relationships with both MCIT Safeguard Specialist and MCIT’s township representatives and will receive training on World Bank safeguard policies and about this ESMF implementation. The Environmental and Social Focal Point will visit pilot sites regularly, especially for the first six months of pilot implementation when s/he should visit pilot sites on a monthly basis, monitor compliance of all pilots with ESMF, receive grievances local people and seek to resolve them in partnership with the MCIT Safeguard Specialist. The figure below provides a summary of key players in Component 2 of the project. 22 Service Agreement/ Contract MCIT and PTD Service Providers for (Safeguard Specialist) Subcomponents 2.2 (Safeguard Focal Point) Subsidy Payment authorized by MCIT and PTD WORLD BANK disbursed directly to service providers, as per signed (Safeguard Specialists) Service Agreement/Contract which will include safeguard requirements and commitments. 23 6. ENVIRONMENTAL AND SOCIAL MONITORING Environmental and social monitoring should address all possible environmental and social impacts that may arise from the project, with the focus on Component 2. The Safeguard Focal Point of the Service Provider will make monthly pilot site visits during the first six months of pilot implementation. Environmental monitoring should encompass vegetation loss, effects on natural terrestrial, fauna and flora, cultural resources, erosion, as well as social surveys, impacts on local peoples, traffic safety and health, and other occupational safety issues. S/he will also monitor the impact of land leases on land use/ livelihood of local people including but not limited to affected land owners/ users, verify the absence of impact on third party due to the lease of the land, and also assess project impacts on ethnic minorities. S/he will hear grievances that people may have and seek to resolve them, or report to MCIT Safeguard Specialist for advice. As part of the initial community outreach, local people should be informed of contact information of the Safeguard Focal Point, MCIT township office and MCIT Safeguard Specialist as well as World Bank office in Yangon, and encourage people to seek for guidance or clarification if necessary. The MCIT with the support of its Safeguard Specialist should agree with the Service Provider on supervision of safeguard instruments and lease agreements within the overall plan for the project. Accordingly, such supervision arrangements should summarize key areas on which supervision will focus: critical risks to their implementation, how such risks will be monitored during implementation, and agreements reached with the Service Provider. Supervision of safeguard instruments and lease agreements, along with other aspects of the project, covers monitoring, evaluative review, recommendations and reporting, and it is designed to:  Determine whether the Service Provider is carrying out the pilot in conformity with environmental and social safeguards and legal agreements;  Identify problems as they arise during implementation and recommend to the Service Provider means to resolve them;  Recommend changes in project concept/design, as appropriate, as the project evolves or circumstances change; and  Identify the key risks to project sustainability and recommend appropriate risk management strategies to the Service Provider. It is vital that an appropriate environmental and social supervision/monitoring plan be developed before works may commence with clear objectives and action plans to ensure their successful implementation. 6.1 ESMF RELATED BUDGET The EMP/ECOPs, Land Lease Agreement and Ethnic Minority Plan for each pilot will outline the appropriate estimated budget required to implement measures for mitigation and monitoring. It will also indicate the estimated costs of required training and capacity building (see Section 5.4). Costs should be calculated based on estimates provided by contractors for any mitigation measures required during the civil works. For example: 24  Costs of ensuring the appropriate dust suppression mechanisms are in place during excavation works must be calculated and included in the tender documents;  Costs of installing erosion control measures should be estimated as part of the engineering costs;  Training of staff on environmental and OHS issues should be outlined in detail (see Table); and  Costs of monitoring noise during construction should be calculated based on the frequency of monitoring and cost of equipment. The EMP table in Annex 7 provides guidance on how to outline these costs. For Ethnic minority plan, it should include detailed and costed out items to mitigate negative impacts and monitor their implementation. 6.2 CAPACITY BUILDING AND TECHNICAL ASSISTANCE REQUIREMENTS As part of best practice, and to comply with international standards for OHS, contractors and supervision consultants should be provided with awareness-raising, environmental, and OHS training on site. These should focus on both the construction and operational phases of the Project. The affiliated cost should be provided by the project. A proposed format for a two-day training workshop is provided in the following Table. Awareness raising and training for civil work contractors and supervision consultants Topic Input Awareness raising 1 day Environmental awareness and the importance of effective mitigation Mitigation measures and environmentally sound construction techniques Compliance with international standards on OHS for the telecommunications sector Compliance with local legislation on OHS and EMP/ECOP requirements Compliance with ESMF provisions on land lease and ethnic minorities. Technical training 1 day Implementation of the EMP (contract clauses) Monitoring of EMPs Preparation of budgets Total 2 days 25 7.0 PROJECT PUBLIC CONSULTATION AND DISCLOSURE PROCESS 7.1 PROPOSED PUBLIC CONSULTATION AND DISCLOSURE PLAN The World Bank procedures require that an ESMF be prepared and publicly disclosed prior to project appraisal. This allows the public and other stakeholders to comment on the possible environmental and social impacts of the project, and the appraisal team to strengthen the document as necessary, particularly measures and plans to prevent or mitigate any adverse environmental and social impacts. This document was publicly consulted in country (on November 28, 2013), disclosed in the World Bank’s InfoShop on December 2, 2013 and in public locations in English and Myanmar language in Myanmar on November 22 and November 25, 2013 respectively before project appraisal. The documents will be made available in English in Infoshop in compliance with the World Bank’s Public Consultation and Disclosure Policy. The final documents reflect any comments and/or suggestions provided during public consultation. Minutes of the public consultation and discussions carried out are attached to this final ESMF document as Annex 8. The site specific EMPs/ECOPs prepared for the pilot program will need to be disclosed to the public during project implementation. Copies should be made available to communities and interested parties in local language in accessible locations through local government authorities, (e.g., local councils, district offices) before works may commence throughout the project implementation. Also, copies of lease agreements including the description on pre-existing claims/ use of land and anticipated impacts on livelihood should also be made available to communities and interested parties. The Ethnic Minority Plan, where prepared, should also be made available to the affected ethnic minority communities in places, manner and language that are accessible to them. Such measures will ensure record keeping and ensure that third-party audits have adequate information when undertaking annual environmental audits. The ESMF and its annexes including general EMP/ECOPs, Ethnic Minority Plan and Land Lease Agreements will also be made available in the Myanmar language. Photographs of consultations being conducted and Minutes of discussions will be submitted to MCIT. The Minutes of consultations will be endorsed by the head of the district administration. Efforts will be made for public consultation announcement to reach as many as project affected people as possible. The Service Providers, in partnership with MCIT and local authorities, will carry out community outreach where the rural connectivity extension pilot (Component 2) is implemented. Ethnic screening will be carried out as part of the community outreach. The objective of the community outreach is to encourage potential beneficiaries to participate in the pilot through informing them of various benefits of the pilot, and ensure that they are also aware of potential negative environmental and social impacts, measures to address them and the contact of the Safeguard Focal Point of the Service Provider, to whom questions and grievances about pilot activities should be addressed. The summary of the ESMF in local language will also be made available to local communities throughout project implementation. Copies of ESMF will be made available in the main district administration offices in the local language. Among other tasks, the Safeguard Focal Point of the Service Provider will develop a short report of each of the community outreach and file them in the project record for review by the Bank. 26 Key stakeholder groups Government and regulatory agencies MCIT, PTD, Districts affected by the project. Public and private sector operators Lead private sector companies, such as major telecommunications operators in Myanmar. Non-government organizations International and local stakeholder groups, including environmental NGOs. Local stakeholders Community-based organizations (CBOs), Municipal and district-level committees, unions, and other local groups. Academic and research institutions Environmental research groups, universities, and technical institutes. Indigenous communities If projects are planned to be performed in an indigenous people’s territory. Development Partners Other donors engaged in the ICT sector in Myanmar For pilots that can be developed in indigenous territories, a translator must be used so that the entire audience can be informed about the project. Concerns and suggestions must be included in the consultation process for the environmental and social evaluation so that they can be considered in the final evaluation. 27 8.0 CAPACITY BUILDING RECOMMENDATIONS 8.1 STRENGTHENING OF PROJECT CAPACITY FOR IMPLEMENTING THE ESMF Appointing an Environmental and Social Safeguard Specialist to MCIT In order to ensure that there is adequate capacity to implement and monitor the performance of the ESMF, it is advised that an Environmental and Social Safeguard Specialist be appointed to MCIT. This Specialist will contribute to the objectives of the Project, which include:  Preparing, together with the implementing entities, of annual work programs and budgets, with a focus on environmental and social management aspects;  Provide Service Providers with clearance to commence civil works, following the reception of no objection from the World Bank on safeguard instruments developed during implementation. Regarding the land lease agreements, first 10 such agreements will require prior review by the Bank.  Monitoring project progress of EMPs/ECOPs implementation as it relates to compliance with the ESMF guidelines, resolving implementation bottlenecks, and ensuring that overall project implementation proceeds smoothly;  Collecting and managing information relevant to the project and accounts (i.e., environmental monitoring and audit reports);  Liaison with the Safeguard Focal Point of Service Providers on all relevant environmental and social management aspects for Component 2;  Verify, through field trips, compliance of Service Providers with ESMF. Field appraisal should be conducted to first two lease contracts; and  Ensuring that the implementing bodies are supported adequately and that they adhere to the principles of the project, specific to compliance with ESMF guidelines. The Specialist should report to the MCIT and PTD, who are responsible for execution of the Project. Training of the MCIT Environmental and Social Safeguard Specialist(s) It is highly recommended that the Environmental and Social Safeguard Specialist be provided with a two-day training workshop on implementation of the ESMF. This training will ensure that the Specialist is able to manage and monitor the environmental and social aspects of the project activities in line with the ESMF requirements. The workshop should take place as part of the project early implementation and can be held in Myanmar. The workshop should be conducted by the Bank team specialists or an external consultant with knowledge on the environmental and social management requirements for Myanmar including substantial knowledge on the World Bank Group’s safeguard policies and requirements (e.g., OHS standards). Other relevant staff members of the MCIT and PTD can be included in the training in order to widen familiarization of the ESMF scope. Capacity Building of the Service Provider Safeguard Focal Point Service Providers commit through their license and contract agreements with MCIT to implement their Environmental Management System (EMS) and follow Health and Occupational Safety procedures in their services and investments relevant to the Project. Other applicable international best practices for environmental and social management in the telecommunication sector as well as the ESMF provisions should be followed during implementation of pilot program under Component 2. The Safeguard Focal Point assigned for Service Providers will additionally be trained on understanding of the World Bank 28 Group’s safeguard policies and requirements (e.g., OHS standards) that are applicable to Component 2. This specific capacity building will ensure that all ESMF provisions will be managed in the context of the proposed project in Myanmar, which currently has limited capacity (including laws and regulations) to meet the requirements of a proper EMS implementation. Also, the Safeguard Focal Point is encouraged to coordinate closely with the MCIT Environmental and Social Specialist during pilot program implementation and reach out to World Bank safeguard specialists for any necessary technical assistance especially during site visits. An outline for the overall training and capacity building is provided in Table below Proposed safeguard training format for ESMF implementation Module Duration Day 1 Introduction 1  Objective of the ESMF  Key stakeholders with a role in the ESMF  Relevant legislative and regulatory acts and World Bank safeguard policies  Structure and role of relevant environmental authorities as relates to the project Day 2 Summary of guidelines for the pilots 0.5  Screening  Appraisal and approval  Disclosure  Annual review  Annual reporting Capacity-building requirements 0.25 Budgeting for the project’s annual work plans 0.25 Total 2 days Proposed budget The proposed budget for implementation of the measures and recommendations outlined in the ESMF for the project is US$165,000. As the pilots and their locations have not yet been identified, a lump sum amount has been designated to address the potential number of implementation of safeguard instruments and lease agreements, which will have to be monitored per requirements under the ESMF. This is an estimate and will need to be updated once the project design has been finalized. 29 Proposed estimated budget for implementation of the ESMF Item Unit Cost Budget for implementation of Lump sum $70,000 EMPs in Myanmar Two 2-day trainings for $3000 per training $3,000 x 2 = $6,000 contractors and consultants in Myanmar Three workshops in Myanmar (one every year for three years) $3000 per workshop $3,000 x 3 =9,000 One 2-day training for the MCIT Environmental and $10,000 per workshop $10,000 Social Safeguard Specialist and (includes training materials) Service Provider Safeguard Focal Point (to be held in Myanmar) Additional Capacity Building 5,000 (on need basis during $5,000 for Safeguard Focal Point (to first year of pilot project be held in Myanmar) implementation) Developing local Lump sum $15,000 environmental, health and safety guidelines for the telecom sector in Myanmar Budget for annual monitoring Lump sum $ 50,000 and reporting on EMP implementation Total $ 165,000 30 ANNEX 1: ENVIRONMENTAL AND SOCIAL SCREENING FORM The following form should be included in the Project’s Implementation Manual. Pilot name: Pilot location (include (e.g., state, district). map/sketch): Type of activity : (e.g., new construction, rehabilitation, periodic maintenance) Estimated Cost: Proposed date of commencement of work: Technical (circle answer): Yes No drawing/specifications reviewed : This report is to be kept short and concise. 1. Site Selection: When considering the location of a pilot, rate the sensitivity of the proposed site in the following table according to the given criteria. Higher ratings do not necessarily mean that a site is unsuitable. They do indicate a real risk of causing undesirable adverse environmental and social effects, and that more substantial environmental and/or social planning may be required to adequately avoid, mitigate, or manage potential effects. Site Sensitivity Issues Rating Low Medium High Natural No natural habitats No critical natural Critical natural habitats present of any kind habitats; other natural habitats present habitats occur Water quality Water flows exceed Medium intensity of Intensive water use; and water any existing demand; water use; multiple multiple water resource low intensity of water water users; water users; potential for availability use; potential water quality issues are conflicts is high; and use use conflicts expected important water quality issues to be low; no potential are important water quality issues Natural Flat terrain; no Medium slopes; some Mountainous hazards potential erosion potential; terrain; steep vulnerability, stability/erosion medium risks from slopes; unstable floods, soil problems; no known volcanic/seismic/ flood/ soils; high erosion stability/ volcanic/seismic/ hurricanes potential; volcanic, erosion flood risks seismic, or flood risks Physical No known or Suspected physical Known physical Cultural suspected physical cultural resources sites; cultural resources Resources cultural resources sites known physical cultural sites in project area resources sites in broader area of influence 31 Site Sensitivity Issues Rating Low Medium High Land Low population Medium population High population acquisition density; tenure rights density; mixed land density; major well-defined; no ownership and tenure human settlements; illegal or mixed land rights; limited cases of illegal occupation use or ownership; no land disputes; no or use of land cases of land disputes; complex, multiple widespread; many no impact on third claims to the lands land disputes; party due to leasing of where infrastructure is complex, multiple land; no communal planned to be built; no claims exist to the properties; and/ or no impact on third party lands where need to extend existing due to leasing of land; infrastructure is core network some communal planned to be built; properties; and/ or no impact on third need to extend existing party due to leasing core network of land; many communal properties; and/ or extension of existing core network necessary Indigenous No indigenous Dispersed and mixed Ongoing or peoples population indigenous populations; potential ethnic no ongoing or potential conflicts ethnic conflicts 2. Checklist questions: Physical data: Yes/No answers and bullet lists preferred except where descriptive detail is essential. Site area in square meters Extension of or changes to existing alignment Any existing property to transfer to pilot Any plans for new construction Preliminary Environmental Information: Yes/No answers and bullet lists preferred except where descriptive detail is essential. State the source of information available at this stage (i.e., Service Provider’s report, or other environmental study). Has there been litigation or complaints of any environmental nature directed against the Service Provider or pilot? Refer to Annex 2, ESMF content (section 3) or relevant environmental authority for this information. Identify type of activities and likely environmental Yes/No answers and bullet lists preferred impacts: except where descriptive detail is essential. What are the likely environmental impacts, opportunities, risks, and liabilities associated with the pilot? 32 Refer to ESMF – Impact, Mitigation, and Monitoring Guidelines Determine environmental screening category: Yes/No answers and bullet lists preferred except where descriptive detail is essential. After compiling the above, determine which environmental category the pilot falls under based on the risk profile. Refer to ESMF– Screening and Review Process Mitigation of Potential Pollution: Yes/No answers and bullet lists preferred except where descriptive detail is essential. Does the pilot have the potential to pollute the environment or contravene any environmental laws and regulations? Does the design adequately detail mitigating measures? Refer to ESMF– Impact, Mitigation and Monitoring Guidelines Environmental Assessment Report or environmental Yes/No answers and bullet lists preferred studies required: except where descriptive detail is essential. Required Environmental Management Plan (EMP): If the screening identifies environmental issues that require long-term or intermittent monitoring (e.g., effluent, gaseous discharges, water quality, soil quality, air quality, noise), does the proposal detail adequate monitoring requirements? Refer to ESMF – Impact, Mitigation, and Monitoring Guidelines Public participation/information requirements: Yes/No answers and bullet lists preferred except where descriptive detail is essential. Does the proposal require, under national or local laws, the public to be informed, consulted, or involved? Has community outreach been completed? If so, has the safeguard focal point of the service provider participated in the community outreach? Has the short report of community outreach been developed and filed? Did local people who participated in community outreach express their support to the pilot? Indicate the time frame of any outstanding consultation process. 33 Land and resettlement: Yes/No answers and bullet lists preferred except where descriptive detail is essential. Some questions may only be confirmed during field appraisal Does the pilot need any non-governmental land to house infrastructure? Will the land be leased from private entities? If so, how large is the size of land needed? Any infrastructure need land > 200m2 per site? Does someone need to physically relocate in order to implement the pilot? Is land lease contract already in place and adequately address all aspects provided in the sample lease agreements attached to the ESMF? Is the lease agreement legally valid and enforceable? Is the lease agreement signed by the land owner/ occupants? Do the land owners/ users clearly understand the terms of lease agreement? Are the lease fees reasonable? Are the land owner/ users willing to lease the land Does anyone have recognizable (even if not fully legal) pre- existing claims to the land where infrastructure will be housed? Is tenure/ titles of the land where infrastructure will be built legal and solid? Is there an easy and secure means of communication that allows land owners/ users and the service providers to contact each other? Does the lease agreement include contact information of land owners and can they be reached and confirm their informed consent to lease agreement? Will anyone other than the formal land owner/occupant use the land for livelihood? Will anyone lose significant livelihood (e.g. more than 10% of cash and non-cash income) as a result of the land lease, and if so, roughly how many are they? Will the construction of infrastructure in the identified sites affect the livelihood of local people? Do land owners/ users reside within the service area of the ICT pilot. Who will monitor the implementation of lease contract? Recommendations: Requires EMP/ECOP, to be submitted on date:. Does not require further environmental studies Reviewer : Name: Signature: Date: 34 ANNEX 2: ENVIRONMENTAL CODE OF PRACTICE (ECOP) This is designed to serve as a code of practice for Service Providers to avoid, minimize, and mitigate potential environmental and social impacts caused by the Extending Connectivity to Rural Areas component (phase 2 of Component 2) of the project, during both its build-out and operation, and maintenance phases. It covers the following areas:  Management measures for preventing, minimizing, and mitigating potential environmental, health, and safety impacts associated with the telecommunications sector (i.e., impacts to natural habitat, migratory birds, and landscape aesthetics);  Management of the telecommunications facilities and their potential effects on the environment (i.e., air emissions, hazardous materials management, and waste); and  An overview of the potential risks of electromagnetic waves to human health. Telecommunications Infrastructure Site Selection for Towers and Communication Masts The site selection process provides the greatest opportunity to prevent or minimize potential environmental impacts from telecommunications towers. Locating towers on steep slopes or ridges that require access roads up very steep slopes should also be avoided because of potential erosion risks associated with the roads. Consideration should also be given to the visual impact of towers on the landscape and efforts should be made to site towers to reduce visual impacts or use existing infrastructure to install transmission and reception devices (e.g., antennae). The site selection process should endeavor to avoid sites that are important and/or protected natural areas or habitats (e.g., wetlands, nature reserves, national parks, cultural heritage sites). Co-location/Sharing and Siting The first principle to be applied by the MCIT when considering the sites of towers is that all infrastructure can be shared among operators, and to the extent possible, can be co-located with any existing MCIT or MPT owned building and facilities. Tower Design and Landscaping Criteria New technologies and materials can minimize the visual impacts of towers, antennae, and supporting structures. For new freestanding towers, the following best practice is recommended: The visual impact of the lower portions of towers can be mitigated by either building shelters in the local architectural style or establishing plant screens. In cases where plant screens are to be installed, attractive native species should be utilized. In rural areas, towers and antennae can be camouflaged or disguised by constructing masts or towers that look like trees, as well as “hidden� in architecture. For new antennae, the following best practice is relevant: (i) Using colors and materials that resemble that of the existing structure on which the antennae is being built helps harmonize the antennae with its surrounding environment; (ii) Operators should avoid using mechanical “tilts� to direct radio waves towards the zones to be covered (that are visible), instead using electrical “tilts� to direct the radiation, minimizing visual impacts. Environmental Impacts Protected Areas Telecommunications infrastructure installation must be avoided in natural protected areas Renovation of Roads/ trails 35 In the event that existing road/ trail infrastructure is damaged during the construction of the tower infrastructure, such roads/trails will be renovated to their original condition. Adequate backfilling and asphalting will be carried out as per existing road construction standards in Myanmar. Indigenous Peoples The development of infrastructure in indigenous peoples’ territories may constitute a risk for the customs and cultural traditions of these populations. The development of infrastructure in indigenous peoples’ territories may constitute a risk for the customs and cultural traditions of these populations. The construction projects and the presence of workers in their territories can affect their customs and lifestyle, with a subsequent loss of identity. Social screening mechanisms will be put in place. Noise Backup power generators are the main source of noise of telecommunications towers. Noise pollution can be minimized by locating the equipment in nonresidential areas and using noise suppression shields and mufflers. Occupational Health and Safety (OHS) Occupational health and safety hazards may occur during construction of the towers and must be carefully managed. The occupational health and safety hazards include the following:  Elevated and overhead work  Fall protection  Confined space entry  Motor vehicle safety In particular, prevention and control measures must ensure that only trained and certified workers access the facilities or any area that could present occupational health and safety hazards, with the necessary safety devices and respect for minimum setback distances. Injuries related to electric shock should also be prevented, minimized, and contained. Site selection Sites should be chosen based on community needs for additional projects, with specific lots chosen based on geographic and topographic characteristics. The site selection process involves site visits and studies to analyze:  The site’s urban, suburban, or rural characteristics;  National, state, or municipal regulations affecting the proposed lot;  Accessibility and distance from inhabited areas;  Land ownership, including verification of absence of squatters and/or other potential legal problems with land acquisition;  Determination of site vulnerability to natural hazards (i.e., intensity and frequency of floods, earthquakes, landslides, hurricanes, volcanic eruptions);  Suitability of soils and subsoils for construction;  Site contamination by lead or other pollutants;  Flora and fauna characteristics;  Presence or absence of natural habitats (as defined by OP 4.04) and/or ecologically important habitats on site or in vicinity (e.g., forests, wetlands, coral reefs, rare or endangered species); and  Physical Cultural Resources, and community characteristics. Construction activities and environmental rules for contractors 36 The following information is intended solely as broad guidance to be used in conjunction with local and national regulations. Based on this information, environmental rules for contractors should be developed for each pilot area, taking into account the site size, characteristics, and location (i.e., rural or urban). After choosing an appropriate site and design in line with the ESMF provisions, construction activities can proceed. As these construction activities could cause significant impacts on and nuisances to surrounding areas, careful planning of construction activities is critical. The following rules (including specific prohibitions and construction management measures) should be incorporated into all relevant bidding documents, contracts, and work orders. Prohibitions The following activities are prohibited on or near the project site: o Cutting of trees for any reason outside the approved construction area; o Hunting, fishing, wildlife capture, or plant collection; o Use of unapproved toxic materials, including lead-based paints and asbestos; o Disturbance to anything with architectural or historical value; o use of open fires at the site; o Use of firearms (except authorized security guards); and o Use of alcohol by workers. Construction Management Measures Waste Management and Erosion: Solid, sanitation, and hazardous wastes must be properly controlled through the implementation of the following measures: Waste (including hazardous waste) Management: o Minimize the production of waste that must be treated or eliminated. o Identify and classify the type of waste generated. If hazardous wastes (including healthcare wastes) are generated, proper procedures must be taken regarding their storage, collection, transportation, and disposal. o Identify and demarcate disposal areas, clearly indicating the specific materials that can be deposited in each. o Control placement of all construction waste (including earth cuts) to approved disposal sites (>300 m from rivers, streams, lakes, or wetlands). Dispose of all garbage, metals, used oils, and excess material generated during construction in authorized areas, incorporating recycling systems and material separation. Maintenance: o Identify and demarcate equipment maintenance areas (>15m from rivers, streams, lakes, or wetlands). o Ensure that all equipment maintenance activities, including oil changes, are conducted within demarcated maintenance areas. Never dispose of spent oils on the ground, in watercourses, drainage canals, or sewer systems. o Identify, demarcate, and enforce the use of within-site access routes to limit impacts to site vegetation. o Install and maintain an adequate drainage system to prevent erosion on the site during and after construction. Erosion Control o Erect erosion control barriers around the perimeter of cuts, disposal pits, and roadways. 37 o Spray water on dirt roads, cuts, fill material, and stockpiled soil to reduce wind-induced erosion, as needed. o Maintain vehicle speeds at or below 10 mph within work areas at all times. Stockpiles and Borrow Pits o Identify and demarcate locations for stockpiles and borrow pits, ensuring that they are 15 meters away from critical areas such as steep slopes, erosion-prone soils, and areas that drain directly into sensitive water bodies. o Limit extraction of material to approved and demarcated borrow pits. Site Cleanup o Establish and enforce daily site clean-up procedures, including maintenance of adequate disposal facilities for construction debris. Safety during Construction The contractor’s responsibilities include the protection of every person and nearby property from construction accidents. The contractor shall be responsible for complying with all national and local safety requirements and any other measures necessary to avoid accidents, including the following: o Carefully and clearly mark pedestrian-safe access routes. o If schoolchildren are in the vicinity, include traffic safety personnel to direct traffic during school hours. o Maintain supply of supplies for traffic signs (e.g., paint, easel, signal material), road marking, and guard rails to maintain pedestrian safety during construction. o Conduct safety training for construction workers prior to beginning work. o Provide personal protective equipment and clothing (e.g., goggles, gloves, respirators, dust masks, hard hats, steel-toed and –shanked boots) for construction workers and enforce their use. o Post Material Safety Data Sheets for each chemical present on the work site. o Require that all workers read, or are read, all Material Safety Data Sheets. Clearly explain the risks to them and their partners, especially when pregnant or planning to start a family. Encourage workers to share the information with their physicians, when relevant. o Ensure that the removal of asbestos-containing materials or other toxic substances be performed and disposed of by specially trained workers. o During heavy rains or emergencies of any kind, suspend all work. o Brace electrical and mechanical equipment to withstand seismic events during construction. Nuisance and dust control To control nuisance and dust the contractor should: o Maintain all construction-related traffic at or below 15 mph on streets within 200 m of the site. o Maintain all on-site vehicle speeds at or below 10 mph. o To the extent possible, maintain noise levels associated with all machinery and equipment at or below 90 db. o In sensitive areas (e.g., residential neighborhoods, hospitals, rest homes) stricter measures may need to be implemented to prevent undesirable noise levels. o Minimize production of dust and particulate materials at all times to avoid impacts on surrounding families and businesses, especially to vulnerable people (i.e., children, elders). 38 o Phase removal of vegetation to prevent large areas from becoming exposed to wind. o Place dust screens around construction areas, paying particular attention to areas close to housing, commercial areas, and recreational areas. o Spray water as needed on dirt roads, cut areas and soil stockpiles or fill material. o Apply proper measures to minimize disruptions from vibration or noise from construction activities. Community Relations To enhance adequate community relations, the Contractor should: o Following the country and EA requirements, inform the population about construction and work schedules, interruption of services, traffic detour routes, and provisional bus routes, as appropriate. o Limit construction activities at night. When necessary, ensure that night work is carefully scheduled and the community is properly informed so they can take necessary measures. o At least five days in advance of any service interruption (e.g., water, electricity, telephone, bus routes) the community must be advised through postings at the project site, at bus stops, and in affected homes/businesses. Chance Finds Procedures for Physical Cultural Resources (PCRs) The contractor is responsible for familiarizing with the following “Chance Finds Procedures� in case culturally valuable materials are discovered/encountered during excavation: o Stop work immediately following the discovery of any materials with possible archeological, historical, paleontological, or other physical cultural value; announce findings to project manager; and notify relevant authorities; o Protect PCRs as well as possible using plastic covers; implement measures to stabilize the area, if necessary, to properly protect PCRs; o Prevent and penalize any unauthorized access to the PCRs; and o Restart construction works only upon the authorization of the relevant authorities. Environmental Supervision during Construction The bidding documents should indicate how compliance with environmental rules and design specifications would be supervised, along with penalties for non-compliance by contractors or workers. Construction supervision requires oversight of compliance with the manual and environmental specifications by the contractor or his designated environmental supervisor. Contractors are also required to comply with national and municipal regulations governing the environment, public health, and safety. 39 ANNEX 3: LAND LEASE GUIDELINES The project is expected to provide positive benefits to local population who reside in areas where Component 2, Extending Connectivity to rural areas, is implemented, as they will have better and cheaper access to ICT services. Limited space of land will have to be secured by service providers who will carry out the pilot to house towers, masts and sub- stations (no other components are expected to require land acquisition or asset loss). It is expected that all land will be secured through a long-term lease contract1 with land owners/ occupants on a commercial basis. It is expected that about 50 – 80 towers/ masts may have to be built under the pilot2 and that not more than 100m2 of land will be necessary to house a tower/mast. Some limited land may also have to be secured for equipment shelters. Where service providers cannot agree with land owners/ occupants on terms of land lease, they will identify alternative sites to house the needed infrastructure where lease contracts can be agreed on a commercial basis. The government will not exercise power of eminent domain or provide any assistance for service providers to secure land but will provide assistance to affected land owners/ occupants so they can make a lease contract with a full understanding of the terms of lease and without significant impact on anyone’s livelihood. Land tenure is not fully established in rural Myanmar, and rural population may have informal claims to the land where service providers plan to build infrastructure. Also, non- land owners may gain significant livelihood through collecting natural resources from the land officially or traditionally owned/ occupied by someone else. Care should thus be exercised to clarify land tenure and use issues before a decision is made to determine where infrastructure should be built. This section provides principles and procedures that should be followed by Service Providers in securing long-term land lease, so the project meets the provisions of OP 4.12. . The World Bank Operational Policy 4.12 Involuntary Resettlement requires that the project impacts resulting from loss of land should be avoided or mitigated if unavoidable so the livelihood of affected people will be restored to the pre-project level. It is notable that the policy applies to activities that cause involuntary land take without regard to the source of fund if they are: (a) directly and significantly related to the Bank-assisted project; (b) necessary to achieve its objectives as set forth in the project documents; and (c) carried out, or planned to be carried out, contemporaneously with the project. Land Lease Procedure 1. Initial site inspection and community outreach. Once pilot sites are identified, the safeguard focal point of the service provider will carry out a site inspection, as part of the initial risk assessment, and assess the salient characteristics of the proposed site and classify risk levels into low, medium or high, using the risk assessment sheet provided in Annex 1 with the relevant section provided below. Those pilots whose risk levels are rated high will not be implemented under this project, given the objective of the pilot to serve commercially unviable rural areas, abundance of alternative pilot sites that need the support of the pilot equally or more, and the likely scale of impact that do not warrant the cost to mitigate them. Instead, service provides will explore alternative sites or change the design of the pilot to reduce the risk level down to low or medium. Risk Assessment Sheet 1 Normally, such a lease contract is made over 15 – 20 years. 2 It is expected that 4 – 5 pilots will be implemented. 40 Issues Site Sensitivity Rating Low Medium High Land Low population Medium population High population acquisition density; tenure rights density; mixed land density; major human and well-defined; no ownership and tenure settlements; illegal livelihood illegal or mixed land rights; limited cases of occupation or use of loss use or ownership; no land disputes; no land widespread; many cases of land complex, multiple land disputes; complex, disputes; no impact claims to the lands multiple claims exist to on third party due to where infrastructure is the lands where leasing of land; no planned to be built; no infrastructure is communal properties; impact on third party planned to be built; and/ or no need to due to leasing of land; impact on third party extend existing core some communal due to leasing of land; network properties; and/ or no many communal need to extend existing properties; and/ or core network extension of existing core network necessary Site inspection should assess, among other issues, whether the pilot is functionally independent of the other networks that may already exist or be under development currently. If the pilot sub-ICT system to be developed under the project requires an expansion of the core ICT network itself, without which the pilot ICT system cannot reach beyond the confines of its own system, the pilot should be redesigned or alternative sites be identified. This is because the extension of the existing core network is considered to be directly and significantly related to the pilot and additional due diligence is required for the extension of the existing core network (which will be carried out outside the pilot). Since such a due diligence requires additional costs and because there are many alternative sites that are also commercially unviable and need support of the pilot, it is considered a more cost effective use of resources that the project fund focuses on areas where such a “linkage� does not exist. Site inspection will also assess whether multiple parties claim indigenous or traditional rights to lands, and whether leasing of the land will affect third party entities. If it finds that multiple, complex claims exist to the land on which infrastructure plans to be built, alternative sites without such multiple claims will be explored to house the infrastructure given the complexities to address such multiple claims. Once the site that is eligible for funding is identified, a half-day community outreach will be carried out where local government officials and community members are invited and explained about the pilot – potential benefits, costs of services and limitations, and likely impacts. The safeguard focal point of the service provider may take the lead, together with the public relations experts of the service provider. MCIT township officials will also participate. Where ethnic minorities are present in pilot areas, free, prior and informed consultations and simple participatory social assessment (SA) will be carried out, and their broad community support will be ascertained, as part of the community outreach. The absence of multiple, complex claims to the land identified to house infrastructure and of potential impacts due to the leasing of the land on third party will also be confirmed or alternative sites without such claims should be explored during the community outreach. Sufficient lead time should be given to communities to ensure a maximum participation of local population. Contact information of the safeguard focal point of the service provider and the safeguard specialist of MCIT will be shared with participants. Copied of a 41 brochure that describes the pilot will also be made available to participating local people. The brochure should be prepared in a language that is easy to understand for local people. 2. Risk screening The safeguard focal point will fill the risk screening sheet provided below to assess risks related to tenure and usage of the land where infrastructure is to be built. The safeguard focal point may or may not carry out another site inspection to fill the screening sheet, depending on the quality and quantity of information collected during the initial site inspection and community outreach. Where it is deemed necessary, the safeguard specialist of MCIT and the World Bank task team may also participate in the field inspection. The relevant parts of the risk screening sheet are attached below, but the following issues will be assessed:  Whether the pilot needs the whole or part of privately owned/ used land to accommodate the infrastructure that needs to be built under the pilot.  Whether only limited land (>200m2) needs to be acquired to build infrastructure?  Whether the private owners/ users have clear tenure rights, or clearly recognizable rights, over the land where infrastructure needs to be built.  Whether the land owners/ users gain significant income (e.g. more than 10% of cash and non-cash income) from the land.  Whether any competing claims exist by informal land owners/users.  Whether the land owners/ users reside within the service area of the ICT pilot.  Whether there is any easy and secure way for the safeguard focal point and the land owner/ users to communicate with each other (mobile, mail, etc), and if so, what it is.  Whether the land owner/ users are willing to lease the land.  Whether someone other than the land owners/ users gain significant livelihood from the land.  Whether the construction of infrastructure in the identified sites affect the livelihood of local people in any way. The risk screening sheet, once filled by the safeguard focal point, will be submitted to MCIT for review. The Bank task team may be consulted if necessary. If the MCIT safeguard specialist considers that all elements in the risk screening sheet have been cleared, or, in his/ her opinion, close to be cleared, and sufficient background information is provided to support the decision, the service provider will be instructed to move to land leasing. If, in the opinion of the MCIT safeguard specialist and based on the information provided in the risk screening sheet, some issues in the risk screening sheet cannot be easily and quickly addressed, including when the absence of multiple claims to identified sites is not clear, alternative sites should be explored. 3. Land leasing Based on the sample lease agreement which will be developed during the first phase of the Component 2 when the pilots are designed, the service provider will prepare and negotiate the lease agreement with the land owners/ users. The exact formats of the land lease agreement will be developed during implementation, but they should include, at minimum:  Description of the pilot sub-project and the impact  Description of tenure/ use of the land that has to be leased to house infrastructure  Duration and fees of lease 42  Assessment of livelihood impacts as a result of the lease, if any, and compensation for livelihood loss; and  Contact information for inquires and grievances The format of land lease agreement will be developed prior to the commencement of the pilot, which will be a legal covenant under the Financing Agreement. If functioning land market exists in the pilot area, the lease fees may be set at the prevailing market values. If land markets are underdeveloped in the pilot area, as will be the case for most pilot sites, the lease fees should be set that will be broadly sufficient to cover the long- term livelihood loss as a result of the leasing. The service provider should also agree with those who have formal or indigenous rights to and derive livelihood from the land on the terms of compensation for loss of livelihood. At the beginning of the negotiation, the land owners/ users should be informed of the contact information of the safeguard focal point and external relations experts of the service provider and the safeguard specialist of the MCIT. They should also be informed of the contact information of the World Bank Myanmar Country Office and encouraged to contact the World Bank if they need additional information or clarification. The signed lease agreement, or a note that demonstrates that the negotiation has proceed to an advanced stage, should be submitted to MCIT safeguard focal point, before the service provider is permitted to move to the next stage. 4. Desk and Field Appraisal The desk and field appraisal will be carried out jointly by the safeguard focal point of the service provider and MCIT safeguard specialist. If necessary, the Bank task team may also participate. The risk screening sheet attached below will be used during the field appraisal, and issues assessed under the risk screening will be verified and those related to the lease agreements will be newly assessed:  Whether the signed lease agreements are legally valid and address all elements of the sample lease agreement provided in the pilot design documents.  Whether the contact information recorded in the checklist and provided in the lease agreement are the same and whether land owners/ users are actually reachable through the contact information.  Based on the face to face interview, whether land owners/ users fully understand the terms and conditions spelled out in, as well as the consequence of, the lease.  Whether the lease fees are broadly reasonable.  Whether clear and affordable monitoring mechanisms are established.  Whether land owners/ users are aware of the contact information of the external relations of the service provider, safeguard specialist of MCIT and the World Bank. Those issues which are found to be outstanding at the time of risk screening should be clarified and resolved during the desk and field appraisal. It is expected that the field appraisal will normally be completed within three days. At the completion of the desk and field appraisal, an appraisal report will be prepared by the safeguard specialist of the MCIT. The format of the appraisal report will be developed as part of the design of the pilot projects. If, as a result of the desk and field appraisal, it is confirmed that the lease agreement is legally valid and all requirements under this ESMF have been adequately addressed, MCIT safeguard specialist will provide clearance to the signing of respective works contracts that will require leasing of the land. Safeguard clearance by the Bank will also be required for the first 10 such contracts – signing of relevant works contracts will not be allowed until the Bank clears the lease agreement and the appraisal report, on top of the clearance of MCIT 43 safeguard specialist. The appraisal report should be kept by the service provider for review by the Bank during missions. 5. Monitoring and evaluation The safeguard focal point of the service provider is responsible for the monitoring of the implementation of lease agreement. S/he should visit the pilot site at least once a month for the first six months of the commencement of civil works, and submit the monitoring report to MCIT as part of the biannual progress report. Subsequently, the monitoring should be based on field visit of randomly selected pilots. Not only the legal parts of lease agreements but also various social impacts due to the implementation of pilots will be monitored. The safeguard focal point of the service provider, in consultation with MCIT safeguard specialist and the WB task team, should swiftly address issues as have been identified. At the end of the pilot, the safeguard focal point will carry out the evaluation of the land lease. Those issues provided in the checklist attached at the end of this annex will be used in the evaluation. If it is found that significant impacts remain to be addressed, they will be duly reported in the evaluation report and measures to address them will be duly implemented. 6. Grievance redress mechanism It is expected that most grievances that land owners/ users may have will be addressed during the field appraisal and through the monthly field visits by safeguard focal point. Nonetheless, local people in the pilot site will be informed of the contact information of the MCIT staff at the township and encouraged to contact them for help. Anyone who has grievances will be encouraged to contact the public relations of the service provider and safeguard specialist of MCIT for help and intervention. In the event that s/he is not satisfied with the measures taken by the service provider or MCIT, s/he should contact the World Bank for clarification. Their contact information will be provided during the community outreach and also on a brochure of pilot that will be made available at local village chief’s office. 44 Risk screening sheet Yes/No answers and bullet lists preferred except where descriptive detail is essential. Some questions may only be confirmed during field appraisal Does the pilot need any non-governmental land to house infrastructure? Will the land be leased from private entities? If so, how large is the size of land needed? Any infrastructure need land > 200m2 per site? Does someone need to physically relocate in order to implement the pilot? Is land lease contract already in place and adequately address all aspects provided in the checklist in this annex? Is the lease agreement legally valid and enforceable? Is the lease agreement signed by the land owner/ occupants? Do the land owners/ users clearly understand the terms of lease agreement? Are the lease fees reasonable? Are the land owner/ users willing to lease the land Does anyone have recognizable (even if not fully legal) pre-existing claims to the land where infrastructure will be housed? Is tenure/ titles of the land where infrastructure will be built legal and solid? Is there an easy and secure means of communication that allows land owners/ users and the service providers to contact each other? Will anyone other than the formal land owner/occupant use the land for livelihood? Will anyone lose significant livelihood (e.g. more than 10% of cash and non-cash income) as a result of the land lease? Will the construction of infrastructure in the identified sites affect the livelihood of local people? Do land owners/ users reside within the service area of the ICT pilot. Who will monitor the implementation of lease contract? 45 ANNEX 4: ETHNIC MINORITY PLANNING FRAMEWORK (EMPF) Introduction and objective of EMPF The project aims to achieve the following objectives: (a) improve the enabling environment for the telecommunications sector and extend coverage in selected pilot locations; and (b) establish priority eGovernment technological foundations and institutional capacity for Government to embark on its public sector reform program. The Component 2, Extending connectivity to rural areas, will support the pilot program that seeks to increase connectivity in commercially unviable areas. Since the Component 2, Extending connectivity to rural areas. will support a pilot that will target rural areas where establishing connectivity is currently not commercially viable, it may be implemented in areas where ethnic minorities are present. OP 4.10 is therefore triggered for this project. Since area where the pilot will be implemented will be decided during implementation, this Ethnic Minority Planning Framework was developed in order to set out policies and procedures that will be implemented during implementation and ensure the project meet all requirements of OP 4.10. The objective of this EMPF is to ensure that free, prior and informed consultations will be conducted with ethnic minorities present in the pilot areas leading to their broad community support to the pilot activities. It also aims to ensure that any negative impacts that may result from the pilot will be fully addressed. Scope of impact Overall, the implementation of the pilot will have positive impacts on ethnic minorities present in the pilot areas. The project will enable cheaper and easier access to telecommunications and internet services in otherwise commercially unviable areas. Whether ethnic minorities reside in pilot areas will only be known during implementation when pilot sites are selected, however, if they are present, they will benefit from the project as the enhanced connectivity will help reduce isolation and improve economic opportunities. The project may have some negative impacts on ethnic minorities if present in pilot areas. The improved connectivity to ICT services may disturb culture and value systems of ethnic minorities, at least temporarily. Also, the implementation of the pilot will require a limited scale of land to install towers, masts and sub-stations. The service providers who will implement the pilot (and install the facilities cited above) will secure needed land on a commercial basis through a long-term lease agreement. Those who will lease the land will receive benefits as the project will provide low cost ICT connectivity to their villages. Those land owners/ users including ethnic minorities who disagree with the lease agreement offered by the service providers have the rights to refuse to lease the land. The knowledge of ethnic minorities on their legal rights, however, may not be sufficient to fully exert their rights in negotiating lease agreements. Also, ethnic minorities may traditionally use the land for livelihood where infrastructure would be built but their indigenous tenure rights may not be legally recognized. Adequate support should be provided to ensure potential negative impacts would not actually occur. Legal Framework Myanmar is one of the most ethnically diverse countries in the region. Officially, there are 135 recognized ethnic minorities. About 69 percent of the country’s inhabitants are Bamar, while the remainder is made up of ethnic minorities, among whom the Shan are the numerically largest group (8.5 percent), followed by the Karen (6.2 percent); Rakhine (4.5 percent), Mon (2.4 percent), Chin (2.2 percent), Kachin (1.4 percent) and Kayah (0.4 percent). Shan State occupies the largest geographical area. Some ethnic minorities have linguistic and cultural affiliations with neighboring countries, others with the majority Bamar. For instance, Shan people speak Shan dialects which are related to Laotian and Thai; whereas Karen people speak a variety of Tibeto-Burman languages. The Rakhine are 46 ethnically related to the Bamar but are culturally different, whereas the Mon people are ethnolinguistically related to Khmer. World Bank Operational Policy 4.10 The World Bank Operational Policy 4.10 Indigenous Peoples aims to ensure that development process fully respects the dignity, human rights, economies, and cultures of indigenous peoples with a social and cultural identity distinct from the dominant society that may make them vulnerable to being disadvantaged in the development process. The policy requires the borrower to conduct free, prior and informed consultations with affected ethnic minorities and ascertain their broad community support to project activities. It also requires that, if ethnic minorities are likely to be present in or have collective attachment to project areas but it cannot be determined until specific investment programs are identified during implementation, an Indigenous Peoples Planning Framework (IPPF) should be developed which provides for the screening and review of these programs in a manner consistent with this policy Objective of the Ethnic Minority Planning Framework (EMPF) This EMPF aims to ensure that the project fully respects the dignity, human rights, economies and cultures of ethnic minorities who are affected under the Project. All elements of IPPF required under OP 4.10 are incorporated in this EMPF. The EMPF seeks to achieve the objective by ensuring that:  Ethnic minorities present in areas of influence of the rural connectivity extension pilot (Component 2) are afforded meaningful opportunities to participate in planning that affects them;  They receive culturally appropriate benefits from the pilot activities; and  Project impacts that may adversely affect them are avoided or otherwise minimized and mitigated. It is noteworthy that the policy applies even if no negative impacts are anticipated due to the project, if ethnic minorities are present in or have collective attachment to project areas. Because of the varied and changing contexts in which ethnic minorities are found, no single definition can capture their diversity. This EMPF, following OP 4.10, defines ethnic minorities as those having the following characteristics in varying degrees: • A close attachment to their ancestral territories and the natural resources in these areas; • Self-identification and identification by others as members of a distinct cultural group; • An ethnic language, often different from the national language; • Presence of customary social and political institutions; and, • Primarily subsistence-oriented production. Ethnic Screening and Project Strategy with regard to Ethnic Minorities Ethnic Screening The safeguard focal point of the service provider will, together with the safeguard specialist of MCIT and in consultation with World Bank task team, carry out ethnic screening using the definition provided above. The ethnic screening will be based on literature review, interview with knowledgeable people and field inspection which should be conducted as part of community outreach that should be carried out during the pilot planning process. The result of the ethnic screening will be reported in the short report of community outreach which should be submitted to MCIT and the Bank for clearance. If, as part of the ethnic screening, an on-going ethnic conflict is found to be occurring or may likely occur during the project life in potential pilot sites, such sites will be considered of high risk and 47 alternative sites will be explored that are free from ethnic conflict. Ethnic screening is a key part of the initial risk assessment and screening process which should be carried out at the pilot identification stage and determine subsequent actions to be taken for the preparation and implementation of the pilot. If ethnic screening does not find that ethnic minorities are present or have collective attachment in pilot areas, the result will be reported in the screening sheet and the short report of community outreach which should be kept in the project file. The bi-annual pilot implementation progress report should attach the filled ethnic screening sheet and the short report of community outreach. Free, prior and informed consultations and simplified participatory social assessment (SA) If ethnic screening finds that ethnic minorities are present or have collective attachment in pilot areas, free, prior and informed consultations will be carried out with them and their broad community support to pilot activities should be ascertained. MCIT safeguard specialist may participate in the consultation meetings. Such consultations will be carried out as part of the community outreach that will be carried out during the land lease preparation process. The safeguard focal point of the service provider will ensure that consultation meetings should be conducted in a language with which participants can easily communicate and that sufficient prior notice should be given to communities to ensure their maximum participation. Minutes of consultations will be taken and kept in the project file. Copies of the minutes should also be made available to affected communities. During the consultation meetings, a simplified, participatory social assessment (SA) will be conducted by the safeguard focal point. The following will be assessed in a participatory manner: (i) general demographic and socioeconomic information of the pilot areas; (ii) existing access to ICT and telecommunication services; (iii) existing patterns of land and natural resource use and whether they have recognizable tenure rights over the land and natural resources from which they derive livelihood; (iv) perceived impacts of improved access to ICT services; (v) potential negative impacts of pilot activities, including due to the leasing of land needed infrastructure (towers, masts and substations); (vi) channels to voice grievances that community members consider most effective and feel confident about; and so on. The result of the participatory SA will be used as project baseline on matters related to ethnic minorities. If land tenure is found to be an issue under the participatory SA, steps specified for “medium� risks under the Land Lease Guideline will be followed. The pilot will not be allowed for project financing if the risk is rated “high� under the risk assessment because issues around tenure rights and land-based livelihood are complex. The safeguard focal point of the service provider will use the result of consultation meetings and initial desk review and develop the Ethnic minority plan. The EM Plan should address, among other issues, the following: (i) summary of participatory SA; (ii) minutes of consultation meetings and evidence of broad community support; (iii) description of project benefit; (iv) description of potential negative impacts and mitigating measures; (v) grievance redress mechanisms; (vi) monitoring and evaluation mechanisms; and (vii) expected cost of implementation. Appraisal and approval The EM Plan will be reviewed as part of the pilot appraisal and approval process. The clearance of the EM Plans by the MCIT safeguard specialist and the Bank task team is the condition of the implementation of the pilot in areas where ethnic minorities are present. Monitoring and evaluation 48 The safeguard focal point of the service provider is responsible for the regular monitoring of pilot implementation including in areas where ethnic minorities are present. For the six months of the pilot implementation, s/he will visit pilot sites on a monthly basis to monitor EMPF implementation, and submit the monitoring report to MCIT as part of the biannual progress report. Subsequently, the monitoring should be based on field visit of randomly selected pilots. The level of satisfaction about project benefits, inputs and suggestions for improvement in pilot implementation, issues around land tenure and livelihood, any negative impacts that may occur as a result of the project, and so on, will be monitored. The detailed monitoring indicators will be developed during the first phase of the Component 2 when the pilots are designed. The safeguard focal point of the service provider, in consultation with MCIT safeguard specialist and the WB task team, should swiftly address issues as have been identified. At the end of the pilot, the safeguard focal point will carry out the evaluation of the EMPF implementation. If it finds that significant impacts remain to be addressed, they will be duly reported in the evaluation report and measures to address them will be duly implemented. Grievance mechanisms It is expected that most grievances of affected ethnic minorities will be addressed during the field appraisal and through the monthly field visits by safeguard focal point. Nonetheless, the affected ethnic minorities will be informed of the contact information of the MCIT staff at the township and encouraged to contact them for help. Anyone who has grievances will be encouraged to contact the public relations of the service provider and safeguard specialist of MCIT for help and intervention. In the event that s/he is not satisfied with the measures taken by the service provider or MCIT, s/he should contact the World Bank for clarification. Their contact information will be provided during the community outreach and also on a brochure of pilot that will be made available at local village chief’s office. 49 ANNEX 5: APPRAISAL, APPROVAL AND MONITORING PROCESS FOR PILOTS THAT REQUIRE AN EMP The Service Provider will submit a copy of the EMP to the relevant environmental authorities and to the implementing agencies (MCIT and PTD). The objective of the EMP is to cater to the environmental and social needs of the project in a simple, responsive, and cost-effective manner that will not unnecessarily overload or impede the project cycle. The EMP should outline the measures needed to address the issues identified during the EA study. Moreover, a good EMP should demonstrate that proposed monitoring activities will encompass all major impacts and identify how they will be integrated into project supervision in a feasible practical manner. The EMP should be a simple 2-4 page document that outlines the following: o Main environmental and social mitigation measures (following ECOPs) (tabular format is advised as in Annex 7; o Environmental training and capacity program; and o Environmental and social monitoring program (tabular format is advised as in Annex 7). This EMP should include the following: Contents of an EMP (details are provided in Annex 7)  Potential environmental and social impacts related to siting, construction, and operation of the pilot;  Mitigation and monitoring measures to address potential impacts;  Responsibilities for monitoring EMP requirements;  Training and capacity-building requirements for project officers and communities; and  Estimated budget for implementation and training. The Service Provider is required to include environmental contract clauses in the technical specifications and account for these measures in the pilot implementation budget. Annex 2 (ECOP) provides a set of recommended contract clauses to include in contractor agreements. Usually, the environmental mitigation plan is part of the bidding documents. Disclosure of Pilot Information In compliance with World Bank guidelines, before a pilot project is approved, the applicable documents (EMP) must be made available for public review at a place accessible to local people (e.g., at a district council office, relevant environmental authority) in a form, manner, and language they can understand. 50 Annual Monitoring Reports Compliance monitoring comprises of a site-inspection of construction activities to verify that measures identified in the EMP are included in the clauses for contractors. This type of monitoring is similar to the normal tasks of a supervising engineer whose task is to ensure that the contractor achieves the required standards and quality of work. Once implementation of the pilot project has started, regular supervisory missions should be carried out (by the Environmental and Social Safeguard Specialists or contracted out to a Consultant) and an annual monitoring report submitted to MCIT and to the World Bank for review. The purpose of these reports is to provide:  A record of pilot transactions;  Implementation of EMP/ECOP;  A record of experience and issues running from year to year throughout the Project that can be used to identify difficulties and improve performance; and  Practical information for undertaking an annual review. Annex 6 presents the recommended format for the annual report. 51 ANNEX 6: FORMAT OF AN ANNUAL ENVIRONMENTAL REPORT Relevant authority: Reporting dates: District: Pilots approved: Pilot title Activities Project Env. EMP Env. Effectiveness Issues (2) phase category completed? Permit of EMP (1) granted? (name, location, title, or (new See note (B or C) Yes, No, or N/A Yes, No, or Good, poor, or See note reference) construction, below N/A needs below rehabilitation, improvement maintenance) 1 2 3 etc Pilots rejected: Pilot title Activities Reasons for rejection Remarks (3) 1 2 3 etc Note (1) Pilot phase will be one of the following: (a) under preparation or appraisal; (b) appraised; or (c) implementation Note (2) Issues: accidents, litigation, complaints, or fines to be listed. Note (3) For example, if an environmental permit was not granted, explain why. 52 ANNEX 7: CONTENT OF AN EMP The EMP should be easy to use. References within the plan should be clearly and readily identifiable. Also, the main text of the EMP needs to be kept as clear and concise as possible, with detailed information relegated to annexes. The EMP should identify linkages to other relevant plans relating to the project, such as plans dealing with resettlement or indigenous peoples issues. The following aspects should typically be addressed within EMPs. Summary of impacts: The predicted adverse environmental and social impacts for which mitigation is required should be identified and briefly summarized. Cross-referencing to other documentation is recommended so that additional details can be readily referenced. Description of mitigation measures: The EMP identifies feasible and cost-effective measures to reduce potentially significant adverse environmental and social impacts to acceptable levels. Each mitigation measure should be briefly described with reference to the impact to which it relates and the conditions under which it is required (e.g., continuously or in the event of contingencies). These should be accompanied by, or referenced to, designs, equipment descriptions, and operating procedures that elaborate on the technical aspects of implementing the various measures. Where mitigation measures may result in secondary impacts, their significance should be evaluated. Description of monitoring program: Environmental performance monitoring should be designed to ensure that mitigation measures are implemented and have the intended result, and that remedial measures are undertaken if mitigation measures are inadequate or the impacts were underestimated. It should also assess compliance with national standards and World Bank Group requirements or guidelines. The monitoring program should clearly indicate the linkages between impacts identified in the ESMF report, indicators to be measured, methods to be used, sampling locations, frequency of measurements, detection limits (where appropriate), and definition of thresholds that will signal the need for corrective actions. Although it is not essential to have complete details of monitoring in the EMP, it should describe the means by which final monitoring arrangements will be agreed. Institutional arrangements: Responsibilities for mitigation and monitoring should be clearly defined. The EMP should identify arrangements for coordination between the various actors responsible for mitigation. 53 Environmental Management Plan A. Mitigation Project Potential Proposed Institutional Cost Comments Activity Environmental Mitigation Responsibilities Estimates (e.g., secondary and Social Measure(s) (including impacts) Impacts (including enforcement and legislation and coordination) regulations) Pre- Construction Phase Construction Phase Operation and Maintenance Phase 54 Environmental Management Plan B. Monitoring Proposed Parameters Location Measurements Frequency Responsibilities Cost Mitigation To be (including methods and of Measurement (including review and (equipment Measure Monitored equipment) reporting) and individuals) Pre-Construction Phase Construction Phase Operation and Maintenance Phase Total Cost for all Phases 55 Environmental Management Plan C. Institutional Strengthening and Training for Implementation I. Institutional Strengthening Position(s) Scheduling Responsibilities Cost Estimates Activity (Institutions, contractors, construction supervision consultants) Mitigation Measures Monitoring Requirements (including compliance) II. Training Activity Participants Types of Content (modules, etc.) Scheduling Cost Estimates Training EMP Implementation, Re-design, Conflict Resolution Environmental Processes, Methods, and Equipment Environmental Policies and Programs 56 Environmental Management Plan D. Scheduling and Reporting Year 1 Year 2 Etc. Activity Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Mitigation Measures ------------- ------------- Monitoring ------------ ------------ Institutional Strengthening ------------ ------------ Training ------------ ------------ 57 MONITORING PART 3: PLAN MONITORING PLAN Phase What Where How When Why C (Is the parameter to (Is the parameter to (Is the parameter to (Define the (Is the parame be monitored?) be monitored?) be monitored?) frequency / orbeing monitore continuous?) During activity preparation During activity implementation During activity supervision 59 ANNEX 8: MINUTES OF PUBLIC CONSULTATIONS Date: November 28, 2013 Time: Session 1 at 1300 hours; Session 2 at 1530 hours Venue: Sedona Hotel, Yangon, Myanmar Purpose of the Meeting: Consultation and Disclosure of the Telecommunications Sector Reform Project and its Environmental and Social Management Framework (ESMF). Participants: Various Organizations and individuals (see attached List of Participants and photographs below) Session 1: 1300 hours Session 2: 1530 hours No of male participants: 21 No of male participants: 10 No of female participants: 11 No of female participants: 7 Total number of participants: 32 Total number of participants: 17 Presenter: U Than Htun Aung, Director, Post and Telecommunications Department (PTD) , Ministry of Communications and Information Technology (MCIT) . Director, U Soe Naing from the PTD also participated from the Government. Facilitator: Kyaw Soe Lynn, World Bank Documenters: Thiha Tun of the World Bank. Resource Panel: Andrea Fitri Woodhouse; Tenzin Dolma Norbhu of the World Bank The table below summarizes the issues raised, comments made, questions asked and clarifications responses provided. Issues Raised/Comments Responses/clarifications U Aung Zaw Oo (Human Right Defenders and U Than Htun Aung (MCIT) responded that Myanmar Promoters) He was jailed in 2007 by Electronic Computer Federation (MCF) is taking lead to change Transaction Act (Clause 33D) and again in 2008. He did this Electronic Transaction Act through parliament. The not see any progress on revising the electronic Electronic Transaction Law (ETL) will be replaced with transaction act and he is not convinced that the a new law which has been drafted with the help of an government will respect the privacy of personal emails, international advisor. Facebook and web contents. The World Bank also confirmed that it had sent official feedback on the draft law to the MCIT and MCF in August 2013. The Bank was specifically asked “How do you ensure MCIT responded that the Telecommunications Law the electronic privacy of people in your project?� specifically states that the basic rights of citizens will not be affected. The World Bank responded that the primary objective of the project is to establish an enabling environment for a competitive telecommunications sector and to extend rural connectivity to remote, rural areas. 60 U Tin Ko Ko Oo ( 88 Generation) The Bank responded that the support is primarily Why World Bank (WB) is giving support to Myanmar in intended for the people of Myanmar. Myanmar’s Telecom Sector? Is it for people or for telecommunication density is only 10%. There is government? Don’t you think it's too early to give econometric evidence that for every 10 % increase in support to Myanmar government? broadband teledensity, GDP will increase by 1.35%. Telecommunications is a capital intensive sector and needs FDI. It is important that a credible and consistent telecommunications regulatory and policy framework is established. Telecommunications reforms are new for Myanmar and the government needs support in capacity building of civil servants to handle the process of reform smoothly and WB is helping on that front. It is not too early to provide support to government and it is just the beginning of the reform. We will continue our support to the government through the reform process so that citizens benefit from quality and affordable telecommunications and internet access. U B Lum Ze (Nyein Foundation) U Than Htun Aung (MCIT) - We will make sure to In border areas, other countries control the use of mobile provide network to rural areas but it takes some time to phones and services. They cut the lines if they think it’s build infrastructure and we will work with universal necessary. Therefore he would like to request MCIT and service fund and the World Bank financed pilot projects WB to extend network to border areas. to roll out the network to rural and remote areas. U Myo Kyaw Thu Myint- Social Empowerment and U Than Htun Aung (MCIT) - We are doing high level Expertise Development (SEED) coordination with line ministries on planning and sustainability of the projects. We will go to rural areas He would like raise on planning, management and where access to electricity is difficult and we will sustainability of the government’s project. He assumed coordinate with Ministry of Electric Power or Ministry the government and WB will ensure the effective use of of Livestock, Fisheries and Rural Development to WB IDA credit. supply power to telecom towers from national grid or off-grid or solar power. In disaster prone areas, how do you ensure safety of For safety of disaster risk areas, it has already been these areas when you build towers and masts? mentioned in the license that the operators should be responsible for the safety standards of their infrastructures in these areas. Also operators will provide support with early warning systems. Do you have any plan to establish independent We will work with WB to move Post and Telecom regulator? Department (PTD) which is currently under MCIT to become the independent regulator named Myanmar Telecommunication Commission (MTC) at the end of 2015. Htike Htike Aung- Myanmar ICT for Development Than Htun Aung (MCIT) Organization (MIDO) 61 She made a few recommendations. Myanmar is a late We will learn from others and we will leapfrog on the comer in telecom sector and she suggested to learn technology and regulatory front. mistakes from others and to avoid mistakes of other countries made. Capacity Development- She did not see details on The private operators are already talking to universities capacity building in the project document. She thought it to establish such training programs (e.g on a PPP basis) will benefit more if the government can establish a TOT as they also need talent. It may not be sustainable for training center like in Thailand rather than study tours government to establish and run such an academy. and visits to other countries. However, Government will provide support and encourage sustainable ways for capacity development in Myanmar. Extending Connectivity- Other countries collect tax MCIT responded that the telecom law, makes provision from operators. How WB is helping on taxation and for universal service obligations, including the proper usage of tax? establishment of a fun. However, MCIT will not collect monies into the fund for the first few years. Some countries tax 10% of revenue from operators. But in Myanmar, the operators have very ambitious targets of 90% coverage within 5 years which any operators have never committed in any other countries. It might put extra burden on operators and ultimately to users if we collect higher tax. Therefore we will not put more pressure on operators. MCIT will not start collecting monies immediately into the fund. Instead, MCIT will develop a universal service strategy, proper fund manual and procedures which will be finalized through public consultations. Spectrum- She noticed monitoring and management of Spectrum- ITU consultant and WB are helping with the spectrum in the document. How do you make sure process. There is adequate spectrum at this time for operators for efficient use of allocated spectrum within a operators. Myanmar Post and Telecom (MPT) is short period of time? currently going through a process to rationalize the use spectrum. MCIT clarified that MPT which is a government operator would not have advantage over other operators on spectrum allocation. WB is also helping on development of national frequency allocation plan. The World Bank added that the project provides technical assistance to PTD to better manage and monitor spectrum. Urban poor- She recognized WB would help on rural MCIT clarified that competition will ensure that the connectivity but not on urban poor. How would you help urban poor receive good coverage at affordable prices. urban poor? Component 2 is to extend connectivity to remote, commercially unviable areas where operators will not go 62 on their own. Liz Khin Hnin Htay- IFI Watch Volunteer Than Htun Aung (MCIT)- We don't have automated She thanked MCIT for providing documents ahead but translation system and he agreed that the ministry has commented that it was high-tech and not user some constraints on capacity to translate every friendly. She gave an example on translation of level documents to Myanmar. Given the technical nature of playing field. She also requested to distribute the sector, some of the terminology is better understood documents in 1-2 weeks advance next time. She also if read in English. He apologized for some irrelevancy of asked when she would get minutes of consultations. translations in the document. Liz - How would you make compensation of land use Than Htun Aung (MCIT)- Operators will not enforce and income stream generation? villagers to use their lands i.e. it is not land grab. It is land leasing and operators can lease only if villagers/ land owners agree. Villagers will get monthly income by leasing land. Moreover, when operators build towers, they will need power supply which can be used for other income generation activities of the village. For example, it can also benefit health clinics in the village where there is no electricity. The clinic can have a refrigerator to store some of the drugs and vaccine to keep cool 24/7. This will be an extra benefit to the local community apart from income generation. Land leasing guideline of WB will make sure there will be no enforcement on villagers for leasing land. Have you done any public consultations on rural areas Than Htun Aung (MCIT)- This is the framework and before? we haven’t done selection of the pilot sites. When we start the selection of pilot areas, we will do proper public consultation in those areas. Myo Kyaw Thu Myint- SEED Than Htun Aung (MCIT) confirmed that such practices will not happen in the telecom sector. Further, the WB He recently attended a conference on landmines and he will not allow such practice. learned that the government put mines near their infrastructure in conflict areas to protect the infrastructure from destruction by armed groups. As a result, the villagers became victims sometimes. He doesn’t want to see that sort of practice in World Bank financed projects. Liz, IFI Watch Volunteer Than Htun Aung- The government is taking a credit Who is accountable for the project? Is WB or MCIT? from World Bank but it is the government’s project and She doesn’t want to see WB and MCIT pointing fingers therefore the government (MCIT) is accountable for the at each other for accountability of the project. project. 63 Lyan Tan Ngaing (Kachin) - City for Development and Than Htun Aung- We will do a proper public IFI Watch consultation with villagers and will explain thoroughly It's difficult to do a meaningful consultation in villages to them about the projects, impacts and benefits. as villagers do not have experiences and do not understand how to express their voices. We will count on the ministry and the WB to have meaningful consultation meetings in villages. Army used to make land grab on farmers and villagers. She requested to avoid land grab in this project. Land leasing- Would the ministry give enough to satisfy We will not grab land. Operators will lease land on a the compensation for land use? willing buyer, willing seller basis. Only if both parties agree can agreement be reached. Other extra benefits can be attained too. It's not like building dams and roads. There will not be land grabs. U Aung Zaw Oo- HRDP and IFI Watch All the policies that have been triggered by this project He heard that there are ten safeguard policies in WB. will be applicable. WB, Operators and MCIT will have Would WB present and apply these policies to ethnic their own safeguard specialists and will make sure that groups in remote areas? the policies are adhered to. U Tin Ko Ko Oo- 88 Generation It was clarified that separate meetings were being held He thought there was not enough representation of CSOs for local and international CSOs and therefore they did in this meeting. He requested MCIT and WB to invite not see such a big group. The rationale for separate more organizations not only from Yangon and Mandalay meetings was so that international CSOs would not be but also from other states and regions. He requested to the only ones speaking at the consultations. do public consultations in both Yangon and Mandalay. Government is seeking inputs and comments from both groups. While many more CSOs had been invited, many regretted that they were unable to come as they were busy with other engagements. MCIT had sent invitations one week in advance. However, very valid points have been made and in the future, there will be a larger and wider circulation for future meetings. Zin Linn Aung - IFI Watch Than Htun Aung (MCIT)- It's a medium risk category as The project is B stage and the current assessment is it is building towers and not building dams and roads. partial. When would you make a full assessment? Where We haven't done on site assessment yet as the pilot is the partial assessment taken? locations have not been identified. This will happen during the implementation phase of the project. Zaw Oo- Lawkaalin Than Htun Aung (MCIT)- We will take your points and We, CSOs participate in various sector specific groups. work with you all the way. WB and MCIT will need to collaborate with land core groups and environmental groups. We have some experts on these issues. Aung Aung- Myanmar Computer Federation (MCF) He requested local CSOs to get involved and to give constructive feedback in revising the Electronic 64 Transaction Act (ETA). He also suggested that local should get a share of investment. Everybody needs to focus on the success of the project. MCF is writing e- commerce law and welcome constructive suggestions from CSOs. Lat Lat Aye (UNDP) Than Htun Aung (MCIT) She requested to consider EIA Guidelines from Ministry We will use WB ESMF guidelines for the project. But of Environmental Conservation and Forestry (MoECF) for other national plans, we will collaborate with when the drafting process is finished. MoECF on EIA guidelines. Myanmar is prone to disasters. Disaster risk is high. We We will put guidelines on disaster recovery plan in don't have concrete policy to prevent disaster. She ministerial Level and will also integrate with WB suggested taking advantage of telecom services to projects. We will look at the disaster risks in pilot areas. prevent disaster. Only in Rakkine, multi-hazard risk assessment has been taken. Marte Brisid- Norwegian Embassy Than Htun Aung (MCIT) – We are not collecting USF How do you tend to work with operators throughout the fund during initial five years. That's why we are process? cooperating with WB to develop Universal Service Strategy and implement pilot projects. We will work hand to hand with other operators: Telenor, Ooredoo, MPT and YTP. All rules are subject to public consultations. U Aung Thu Ya (MPT) Than Htun Aung (MCIT) – The project will have regular Do you have audit team in your project? How do you reporting and biannual auditing. MCIT will have internal manage e-waste of equipment? audit and WB will also ensure that the project financial management is in line with their procedures. For e-waste management, it has already been included in the operating licenses. U Yan Naing- ADB Than Htun Aung (MCIT) Will there be any serious environmental impacts? The project will have medium negative impact on environment and social sides. But he saw bringing more positive impact rather than negative by enabling access to mobiles and creation of more jobs. Carson Wolfer – Ooredoo The Bank requested the operators to share the broad He answered the questions from MCIT and the World principles that they are adopting for their operations on Bank on communication strategy and environmental land lease arrangements. impacts. We are looking at environment and social Than Htun Aung (MCIT) - He suggested that operators impacts with the ministry. The operators have met their need to work with local communities. nationwide roll-out obligations in other countries such as Iraq, Pakistan, Algeria and are convinced that they can do the same in Myanmar. Their experience is that their best security is the communities that benefit from the services. 65 Than Htun Aung (MCIT)- Do CSOs have any other suggestions on the following? He requested to send comments and inputs anytime in the future. 1) Any questions or clarifications on the project? 2) Any good examples of land lease agreements between private firms and land owners? 3) What is the best way to help remote villagers have their grievances heard (if any)? 4) Any good examples of community outreach so more people become aware of the pilot telecom services and safeguard measures? 5) Any other suggestions? 66 List of Participants: November 28, 2013 67 68 69 Pictures from the Public Consultations held on the Telecommunications Sector Reform Project November 28, 2013