PROCUREMENT PLAN Project Information: EMERGING INFECTIOUS DISEASES PREVENTION, PREPAREDNESS AND RESPONSE(P173746( Project Implementation agency: 1. NHC PMO&PIU 2. MARA PMO&PIU 3. NFGA PMO&PIU 4. PHC-Jiangxi PMO 5. PARA-Jiangxi PMO 6. PFGA-Jiangxi PMO 7. PDRC-Hainan PMO 8. PHC-Hainan PIU 9. PARA- Hainan PIU 10. PFGA- Hainan PIU Date of the Procurement Plan: May 2020 Period covered by this Procurement Plan: initial 3 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 and revised on November 2017 and August 2018) (“Procurement Regulations”), the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. Also, applicable to the project will be the World Bank ‘s Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by IBRD Loans and IDA Credits and Grants, dated October 2006, and thereafter revised in January 2011 and July 1, 2016. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The proposed procurement approach for the required Goods, Works, Consulting Services and Non-consulting Services. The streamlined procurement and selection methods and market approaches will be adopted for procurement during the immediate response and recovery phase. Detailed selection method and market approach for specific contracts will be included in the procurement plan. • Direct selection as appropriate • Extension of existing contracts where they include required goods and services • Request for Quotations (RfQ) • Consultants Qualifications-based Selection (CQS) 1 • Framework Agreements (FA) including tapping into existing ones • Force Account • Request for Bid (RfB) • Request for Proposal (RfP) • Quality Cost Based Selection (QCBS) • Quality Based Selection (QBS) Procurement Method and Procurement Review Thresholds Contract Expenditure Value Procurement Prior-Review Category Threshold Method Threshold (USD) (USD) 1. Goods, ≥10,000,000 RfB-International All Information Technology and <10,000,000 RfB-National ≥2,000,000 Non-Consulting Services <500,000 Request for Not applicable Quotation None ≥2,000,000 Direct Selection None ≥2,000,000 Framework Agreement 2. Works, Supply ≥40,000,000 RfB-International All and Installation of Plant and <40,000,000 RfB-National ≥10,000,000 Equipment <500,000 Request for Not applicable Quotation None Not applicable Force Accounts 3. Consulting ≥300,000 QCBS/QBS ≥1,000,000 Services <300,000 CQS Not Applicable None Fixed Budget ≥1,000,000 Based Selection Least Cost Based ≥1,000,000 None Selection None Individual ≥300,000 consultant None ≥1,000,000 Direct Selection (firm) None ≥300,000 2 Contract Expenditure Value Procurement Prior-Review Category Threshold Method Threshold (USD) (USD) Direct Selection (individual) 3 Annex 1 Procurement Plan Expecte Estima Estima Review d TOR Ser Procure Contract Contrac Contract ted ted by Bank issuanc ial ment Duration t No. Description Cost In Cost In (Prior/Po e/BD No. Method (months) CNY USD st( issuanc e Expert Team Consultant 3,500,0 500,00 1 CS-1 DS Post June 15 60 (several 00 0 individuals) CS-2 ESMF&SEP Update 700,000 100,00 IC/DS Post June 15 3 2 0 CS-3 Procurement 1,400,0 200,00 LCS/CQS Post June 15 60 3 Agent 00 0 Project NHC-CS- Management 1,050,0 150,00 4 IC/DS Post June 15 60 1 Support Staff 00 0 (individual) Project 1,050,0 150,00 IC/DS Post June 15 60 MARA- Management 00 0 5 CS-1 Support Staff (individual) Project 1,050,0 150,00 IC/DS Post June 15 60 NFGA- Management 00 0 6 CS-1 Support Staff (individual) Project 1,050,0 150,00 IC/DS Post June 15 60 PHC-JX- Management 00 0 7 CS-1 Support Staff (individual) 4 Expecte Estima Estima Review d TOR Ser Procure Contract Contrac Contract ted ted by Bank issuanc ial ment Duration t No. Description Cost In Cost In (Prior/Po e/BD No. Method (months) CNY USD st( issuanc e Project 1,050,0 150,00 IC/DS Post June 15 60 PFGA-JX- Management 00 0 8 CS-1 Support Staff (individual) Project 1,050,0 150,00 IC/DS Post June 15 60 PARA-JX- Management 00 0 9 CS-1 Support Staff (individual) Project 1,050,0 150,00 IC/DS Post June 15 60 PDRC- Management 00 0 10 Hainan- Support Staff CS-1 (individual) 5 PROCUREMENT China : Emerging Infectious Diseases Prevention, Preparedness and Response Project PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2021-04-02 2021-07-30 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173746 GPN Date: 2021-03-11 Project Name: Emerging Infectious Diseases Prevention, Preparedness and Response Project Loan / Credit No: IBRD / 90840 J Executing Agency(ies): iangxi health PMO WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Improving risk-based JX-FC-3 / Consultant service surveillance systems for Quality And Cost- Under IBRD / 90840 Prior Open - International 0.00 2021-05-09 2021-05-30 2021-07-13 2021-08-10 2021-09-09 2021-10-14 2021-11-18 2022-11-18 for project management zoonotic and other emerging Based Selection Implementation health threats INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual JX-IC-2 / Preparing of Social Management Framework(SMF):From the Improving risk-based Individual perspective of social risks, surveillance systems for Pending IBRD / 90840 Post Consultant Limited 0.00 2021-08-03 2021-08-08 2021-08-29 2021-10-03 2022-04-01 establish a social risk zoonotic and other emerging Implementation Selection management mechanism, health threats including social risk screening criteria. JX-IC-6 / Preparing of Project Operation Manual:The project Improving risk-based operation manual will provide Individual surveillance systems for Pending the necessary administrative IBRD / 90840 Post Consultant Limited 0.00 2021-08-03 2021-08-08 2021-08-29 2021-10-03 2022-04-01 zoonotic and other emerging Implementation and management Selection health threats requirements during the project implementation. JX-IC-1 / Preparing of Environmental Management Framework(EMF):From the Improving risk-based environmental and social Individual surveillance systems for Pending aspect, establish the IBRD / 90840 Post Consultant Limited 0.00 2021-08-03 2021-08-08 2021-08-29 2021-10-03 2022-04-01 zoonotic and other emerging Implementation environmental and social risk Selection health threats management mechanism, including environmental and social risk screening criteria. Page 1