International Bank for Reconstruction and Development International Development Association SecM92-898 FROM: Vice President & Secretary July 1, 1992 MONTHLY OPERATIONAL SUMMARY OF BANK AND IDA PROPOSED PROJECTS (As of June 15, 1992) Distribution: Executive Directors and Alternates Office of the President Executive Vice Presidents, IFC and MIGA Vice Presidents, Bank, IFC and MIGA Directors and Department Heads Bank, IFC and MIGA . fIг tl � � � _ � TABLE OF CbNTENTS Summary of Bank and IDA Proposed Projects i Information on Environmental Assessment v SECTION REGION PAGES I. AFRICA 1 - 41 Angola .................................... I Benin .................................... 2 Benin/Togo ............................... 3 Burkina Faso ............................. 4 Burundi .................................. 5 Cameroon ................................. 6 Cape Verde ................................ . 7 Central African Republic ...... * ........... 8 Chad ...................................... 9 Comoros .................................. 10 Cote d'Ivoire ............................ 10 Djibouti ................................. 11 Equatorial Guinea ......................... 12 Ethiopia ................................. 12 Gabon ...................................... . 14 The Gambia ................................ 14 Ghana .................................... 15 Guinea ................................... 16 Guinea-Bissau ............................ . 17 Kenya .................................... 18 Lesotho .................................. 18 Madagascar ............................... .19 Malawi ................................... 21 Mali ...................................... 22 Mauritania ............... i ............... 24 Mauritius ................................ 24 Mozambique ............................... 25 Niger ..................................... 27 Nigeria .................................... 28 Rwanda ................................... 31 Senegal .................................. 32 Seychelles ............................... 34 AFRICA REGION (Contd.../...) Sierra Leone............................. 34 Swaziland................................ 35 Tanzania........ ....................... 35 Togo ..................................... 36 Uganda ................................... 37 Zaire .................................... 38 Zambia ................................... 39 Zimbabae................................. 40 Africa Regional.......................... 41 II, EAST ASIA & PACIFIC REGION 42 - 67 Cambodia................................. 42 Ch ina .................................... 42 F iji ..................................... 50 Indonesia................................ 50 Koreaa.......... 55 Lao, People's Democratic Republic........ 57 Malaysia ................................. 59 Mongolia ................................. 61 Papua New Guinea......................... 61 Philippines.............................. 62 Solomon Islands.......................... 65 Thailandl6....................... ........ 65 Vanuatu .................................. 67 Western Samoa............................ 67 III. EUROPE AND CENTRAL ASIA 68 - 78 Albania. ................................ 68 Bulgaria ................................. 68 Czechoslovakia........................... 69 Estonia.................................. 70 Hungary........ .......................... 70 Latvia ................................... 71 Lithuania................................ 71 Poland7................................... 72 Romania.................................. 73 Turkey7................................... 76 Yugoslavia ............................... 78 IV. LATIN AMERICA AND CARIBBEAN 79 - 105 Argentina................................ 79 Barbados................................. 80 Belize ....... ............................ 81 Bolivia.................................. 81 Brazil................................... 82 Caribbean Region ......................... 86 Chilee........................ 87 Colombia................................. 88 Costa Rica ............................... 90 Dominican Republic....................... 90 Ecuador .................................. 91 El Salvador .............................. 91 Guatemalae.................. 92 Guyana ................................... 92 Haiti .................................... 94 Honduras............................ ..... 94 Jamaica .................................. 95 Mexico ................................... 97 Nicaragua................................ 99 Paraguay ............. .................... ga99 Peru ..................................... 100 Trinidad & Tobago........................ 102 Uruguay. 103 Venezuela ................................ 103 - iv - V. MIDDLE EAST AND NORTH AFRICA 106 -117 Algeria .................................. 106 Egypt, Arab Republic of.................. 109 Iran ..................................... 110 Morocco.................................. 111 Tunisia .................................. 114 Yemen, Republic of....................... 11 VI. SOUTH ASIA 118 - 138 Bangladesh. ....................... 118 Bhutana........................... 122 India .................................... 122 Nepal .................................... 130 Pakistan ................................. 132 Sri Lanka................................ 136 VII. NEW PROJECTS ADDED IN THIS ISSUE 137 - 141 VIII. PROJECTS DROPPED FROM LENDING PROGRAM 142 - 145 AND PROJECTS SIGNED MOS ANNEX I Environmental Overview of Category A Projects II - 187 Environmental Overview of Category B Projects 188 - 1136 MOS ANNEX II Global Environment Facility - Quarterly IIl - 114 on Investment. Projects Secretary's Department -v- INFORMATION ABOUT THE ENVIRONMENTAL ASSESSMENT PROCESS APPLIED TO IBRD AND IDA PROPOSED PROJECTS In October 1989 the Bank established a specific policy and procedures for environmental assessment and related environmental analyses of IBRD and IDA lending operations. Under this environmental assessment process, the type, timing and main issues of environmental analysis to be performed by the borrower are to be confirmed at the time that a given lending operation is initiated into the Bank's prospective lending program and thereafter reported and updated on a quarterly basis in the Monthly Operational Summary. In October 1991 the Bank revised these policies and procedures so that projects are now assigned one of the following categories based upon the nature, magnitude, and sensitivity of environmental issues: Category A - Environmental Assessment is normally required as the project may have adverse and significant environmental impacts. Category B - More limited environmental analysis is appropriate, as the project may have specific environmental impacts. Category C - Environmental analysis is normally unnecessary. (The former Category D is being phased out.) The 1991 revision also introduced the use of a standard environmental data sheet for all projects to identify the main issues and schedule for any required environmental analysis. Project descriptions in every issue of the Monthly Operational Summary include the environmental category. On a quarterly basis (in the January, April, July and October issues) the Monthly Operational Summary contains an environmental annex which includes the environmental data sheets for Category A projects and data sheet headers for Category B projects. 驪‘面‘面面面面面.繭面面面面 / 么 一J i 一 ,lember Country, Amount & fmplementing Probable Stage of Processing and 1gen'y Lender Project Consulting Services Action on Procurement I. AFRICA REGION ANGOLA Ministry of 59.7 (R) Rehabilitation Adjustment - Would To be determined. Project under Finance (IDA) provide import financing to support preparation. rehabilitation adjustment program. Environmental Assessment Category: To Be Determined. Ministry of Plan 14.9 (R) Technical Assistance II - Will To be determined. Project under- (IDA) support the Lmplementation of the preparation. adjustment program, with particular emphasis on the "public investment program". Environmental Assessment Category% To Be Determined. Central Bank, 50.0 (R) Private Sector Development - The Consulting services will Project under Ministry of (IDA) project will support extensive be required. preparation. Industry and deregulation of private economic Finance activity and the establishment of property rights, and also initiate tax and trade reforms. Environmental Assessment Category C. Ministry of 25.0 Agric ' ultural Services- The project Consulting services will Preparation under way. Agriculture (IDA) would include five components: (a) high be required for level agricultural education; technical assistance. (b) research:-(c) extension; (,a) seeds production; and (d) support to land titling. Environmental Assessment Category: To Be Determined. Ministry of 20.0 (R) Manpower Training - Project seeks to To be determined. Project preparation under !Education (IDA) improve training and manpower way. development through institutional and policy development, strengthening labor market information, encouraging the *involvement of the private sector in training and financing specific training activities. Environmental Assessment Category C. , inistry of 20.5 (R) Fisheries Resource Management To be determined. Project preparation under Fisheries (IDA) Project has three components: way. (a) formulation and implementation of a "Fisheries Management Regime"; (b) support to privatization; and (c) rehabilita-tion/development of fish landing infrastructure for industrial and small-scale fisheries. Environmental Assessment Category B. Addresses of Implementing Agencies of new projects are given in Section V of the Summary. The amount is in millions of US dollars and is approximate and tentative . SAF is the acronym for the Special Facility of Sub-Saharan Africa. The letter (N) before projects means that the project is a new listing in the summary; the letter (R) means the information about the project has been revised since the last issue. This column contains available information, if any about action with respect to the procurement of goods and services expected to be financed by the Bank or IDA, including retroactive financing; expenditures under the IBRDJIDA Project. -2- Member Country, Amount & Implementing Probable Stage of Processing Agency Lender 2 Project 3 Consulting Services Action on Procuremen ANGOLA (Cont'd) Ministry of 41.0 (R) Transport Recovery - Restoration and Consulting services will Negotiations completi Planning-INEA- (IDA) preservation of surface access to large be required for Lobito Port portions of country to support ' supervision of civil resumption of economic activities and works and technical repopulation of countryside by ensuring assistance. minimal road, rail and port service. Environmental Assessment Category B. Ministry of Energy 33.5 (R) Power System Rehabilitation - Consulting services will Approved by the Exec (IDA) Technical assistance to public utilities be required. Directors on June 11 and rehabilitation of main transmission 1992. lines from existing hydroelectric power plants to principal consumption centers. Environmental Assessment Category B. Lobito Corridor 25.0 Lobito Corridor - Rehabilitation of Contract signed for Project preparation Authority (LCA) (IDA) Lobito Port Transport System, which consultancy services for way. includes Lobito Port and the Benguela feasibility study, Railways. Environmental Assessment approximately Category B. 60 man-months. Ministry of Health 20.2 (R) First Health (formerly Health I) - Consulting services are Project appraisal re (MOH) (IDA) Project seeks to strengthen MOH's being selected. under preparation. capabilities in essential areas of health policy, health sector management and public health program development. Will also improve health care in selected regions, through the rehabilitation of training and health facilities, including improvement of service delivery. Environmental Assessment Category C. Central 26.0 (R) Financial Institutions Development/ Consulting services Appraisal mission Bank/Ministry of (IDA) Private Sector - Technical assistance to be determined. completed. Appraiss Finance and training in support of establishment report under preparz of two-tier banking system and private sector development, with special attention to be given to expected implementation capacity. Environmental Assessment Category C. Ministry of 27.1 (R) Education I - Rehabilitation and Consultants have been Approved by the Exec Education (IDA) construction of schools and Improvement selected (about 55 Directors on June 2, of conditions of teaching;.institutional staffweeks). 1992. Credit was si development of various units within the on June 12, 1992. Ministry of Education and university's management information system; and human resource development through initial and in-service training of teachers, inspectors and administrators. Environmental Assessment Category C. BENIN Direction de 14.0 (N) Rural Water Supply and Sanitation To be determined. Identification miss: l'Hydraulique (IDA) Sector - Project will support the scheduled for June decentralization of rural water supply activities, and development of local private sector and NGO participation. Will also support construction of 1,750 new water points, and promotion of low cost solutions for rural sanitation. Environmental Assessment Category B. -3- ember Country, Amount & Emplementing Probable Stage of Processing and %gency Lender 2 Project Consulting Services Action on Procurement IENIN (Cont'd) iinistry of 35.0 (R) SAL III - The program would broaden To be determined. Project is in initial Pinance (IDA) and deepen reforms initiated under SAL stages of preparation. II, with particular focus on administrative reform and improvements in the framework for private sector development. Environmental Assessment Category: To Be Determined. .RCAM/CLCAM 3.0 (R) Rural Credit II - The project would To be determined. Pre-appraisal mission is (IDA) continue the process of rehabilitation currently in the field. and strengthening of the network of Appraisal mission rural savings and loan cooperatives scheduled for end June commenced under the first rural savings 1992. and loan rehabilitation project. Environmental Assessment Category: To Be Detdrmined. inistry of Plan 12.6 (R) Economic Management Support - The To be determined. Pre-appraisal mission nd Economic (IDA) project will consist of: (a) institu- completed. Appraisal structuring tional restructuring; (b) capacity mission scheduled for building through technical assistance . June 20, 1992. and a training center; and (c) studies and institutional measures as needed through the implementation of the adjustment program. Environmental - Assessment Category C. inistry of 20.0 Education Sector Adjustment - To support Consultants already Project under ational Education (IDA) the Government's policy and reform identified. preparation. program for developing primary education A PPF request of and improving the quality and relevance US$380,000 has been of educational services through the approved. implementation of a set of institutional and structural measures for: program development and management; financial resource management including improved allocation and mobilization of resources, general sector reorganization and decentralization; and personnel management. Environmental Assessment Category C. KNIN/TOGO )mmunaute 30.0 Adjarala Hydroelectric - Hydroelectric Feasibility study and Project under ectrique du (IDA) project on the Mono River, 97 km environment assessment preparation. -nin downstream of Nangbeto, including dam, under way by Coyne and electric equipment turbines, related Belier/EdF (France). transmission lines, and resettlement (environment). Total project cost US$220.0 million. Environmental Assessment Category A. mmunaute 5.5 (R) Engineering and Technical Assistance Consulting services will Approved by the Executive ,ectrique du (IDA) - Engineering, environmental, tariff, be required to undertake Directors on May 19, nin studies, master-plan for generation, studies. 1992. transmission and distribution, technical assistance and training for CEB, a regional entity. Environmental Assessment Category C. -4- Member Country, Amount & Implementing Probable Stage of Processin Agency I Lender 2 Project Consulting Services Action on Procuremi BURKINA FASO Ministry of 100.0 (N) SAL II - Second phase of macro- To be determined. Identification undE Finance (IDA) policy reforms, including tariff reform. Environmental Assessment Category C. To be determined 40.0 (N) Urban Environment - Project seeks to To be determined. Preparation under v (IDA) improve management of natural resources and urban management, and to upgrade the infrastructure of Ouagadougou to improve health standards. Environmental Assessment Category B. To be determined 5.0 (N) Environment Management - Training To be determined. Identification und (IDA) and institutional management for managing the rural and urban environments. Environmental Assessment Category: To Be Determined. Ministere de 10.0 (R) Food Security - Project would Consulting services may Board presentation 1'Agriculture et (IDA) strengthen institutions to improve be required. scheduled for July de 1'Elevage information systems, the management 1992. information system, an early warning system and enhance emergency preparedness, establishing a food security and Nutrition Fund channelled through NGOs to support income generating activities and nutrition education. Would also support the creation of a national food security and nutrition commission. Total project cost is estimated at US$10.0 million. Environmental Assessment Category C. Ministries of 15.0 (R) Public Institutional Development - Consulting services will Approved by the Ex Finance and Plan (IDA) Increase public administration, be required. Directors on June efficiency and accountability through: 1992. (a) strengthening budget preparation and implementation and civil service reforms; (b) reforms to commercial laws and training of legal staff; and (c) strengthening public accounting and procurement all through process reform, technical assistance and training. Environmental Assessment Category C. Ministry of 35.0 Private Sector Development - The project Consultants will be Project under Economic Promotion (IDA) would include various technical required. preparation. assistance components. Environmental Assessment Category B. Ministere de 28.0 (R) Agricultural SECAL - Policy reforms Consultants will be Approved by the Ex l'Agriculture et (IDA) in the cotton, cereals, livestock and required (estimated at Directors on June de 1'Elevage horticulture subsectors, including 200 staffweeks). 1992. pricing, restructuring of stabilization mechanisms, marketing regulations and boards. Substantial reforms to improve public sector efficiency and possibly some investments. Total project cost estimated at US$70.0 million. Environmental Assessment Category C. -5- ember Country, Amount & pplementing Probable Stage of Processing and gency Lender 2 Project 3 Consulting Services Action on Procurement 4 URKINA FASO Cont'd) inistere de la 35.0 (R) Health and Nutrition (formerly Consultants will be Project under ante (IDA) Population/Health) - Strengthening required. preparation. health sector management, extension of nutrition/ tropical disease control activities begun under first project, programs to improve women's conditions. Environmental Assessment Category C. knistry of 31.0 Education Sector V - Continued To be determined. Identification mission lucation (IDA) assistance of Government in implementing tentatively scheduled for education reform through financing of September 1992. selected investments in the sector public investment program. Project would also be a continuation of the effort started in the education sector development project to improve education quality and efficiency within the constraints of the sectoral budget. Environmental Assessment Category C. nistry of Land 26.0 (R) Natural Resource Management and To be determined. Project under anning, Tourism (IDA) Environment - Implementation of preparation. Environment environmental action plan. Project would focus on: (a) development of soil conservation, agro-forestry, reforestation; (b) improvement of land security in priority zones; (c) development of environmental research; and (d) improvement of local and central institutions. Environmental Assessment Category B. rnitral Bank, 17.0 (R) Private Sector Development - Will Consulting services will Approved by the Executive nistry of (IDA) provide funds to finance: (a) private be required. Directors on April 30, nmerce & investments through eligible financial 1992. dustry (MCI), intermediaries via BRB as APEX nistry of Public institution, with particular emphasis on rks and Urban export-oriented projects; (b) public relopment investment in industrial sites and rPDU), Bank of services through MTPDU; and (c) a multi- a Republic of * faceted technical assistance to MCI cundi (BRB) private entrepreneurs, BRB and banks. Environmental Assessment Category B. aistry of 3.5 (R) Agribusiness Promotion - Project Technical assistance Negotiations scheduled :iculture & (IDA) will focus on: (a) privatization of key will be required for for end June 1992. restock; agro-industries; (b) promotion of privatization of agro- xistry of private sector involvement in import . industries and amerce & substitution and export diversification; professional expertise lustry and (c) support to the establishment of needed to support a small private investment and . private enterprises. management company. Environmental Assessment Category C. tistry of Health 33.0 (R) Health/Population II - Sectoral To be determined. Project under (IDA) development and continuing support to preparation. ongoing priority programs. Environmental Assessment Category C. -6- Member Country, Amount & Implementing Probable Stage of Processin Agency Lender 2 Project Consulting Services Action on Procurem BURUNDI (Cont'd) Ministry of Plan 21.0 (R) Social Action - Project will Consultancy will be Appraisal mission (IDA) contribute to poverty alleviation by required. field. encouraging larger participation in small scale production activities and infrastructure. Will also provide surveys to monitor social situation, technical assistance and training. Environmental Assessment Category B. Ministry of Plan; 30.0 (R) SAC III - Continued support to Consultants will be Approved by the Es Ministry,of (IDA) Government's adjustment program and required. Directors on June Finance consolidation of policy reforms 1992. undertaken under SAL I and II. Emphasis will be given to agricultural and export promotion reforms. Total project cost estimated at US$95.3 million. Environmental Assessment Category C. CAMEROON Ministry of Mines, 15.0 (N) Energy Sector - Policy reform in the To be determined. Identification unt Water & Energy (Bank) power, petroleum products and gas sectors emphasizing pricing and regulation. Environmental Assessment Category C. Ministry of 40.0 (N) Private Sector Development - To be determined. Project under Industry (IDA) Improvement in business environment preparation. including financial sector, investment promotion and the judiciary. Environmental Assessment Category C. Ministry of 25.0 (N) Agricultural Research II - Consulting services will Project preparatt Technical and (Bank) Restructuring of National Agricultural be provided by ODA, GTZ, way. Scientific Research. Environmental Assessment the Cameroonian Research Category: To Be Determined. Government, and FAO/CP. Ministry of Posts 7.0 (N) Second Telecommunications - To be determined. Project is in pre I and (IDA) Telecommunications support to MPTT to appraisal stage. Telecommunications strengthen sector structure and (MPTT) regulatory framework and commercialize the telecom and postal parastatals. Environmental Assessment Category: To Be Determined. Ministry of Urban 40.0 Urban Management Improvement - Project Consultants were Preparation missi and Housing (Bank) would clarify the roles of private and appointed under the scheduled for Sep public actors and rationalize public Second Urban Project. 1992. investments in the urban sector. Project would also improve urban services financing mechanisms and urban land resources management, and rehabilitate parastatal housing agencies. Environmental Assessment Category B. -7.- nber Country, Amount & plementing Probable Stage of Processing and ency Lender 2 Project ' Consulting Services Action on Procurement .EROON )nt'd) istry of Public 45.0 (R) Transport Sector - Development of Consulting services will Pre-appraisal mission :ks and (Bank) transport sector policy objectives and be required to review scheduled for October/ insport sectoral investment planning mechanism, different aspects of the November 1992. based on economic priorities, comprising transport sector and, in all subsectors; development of a new particular, the trade road maintenance strategy, intermodal -logistic subsector. efficiency and rationalization of transport sector public enterprise performance (air, rail, maritime, bus transport); promotion of small enterprises: and institutional development, training and technical assistance. Environmental Assessment Category B. ister9 de 15.0 (R) Agriculture Restructuring and Consultants have Project under griculture (Bank) Diversification - To promote export submitted feasibility preparation. Start-up diversification crops, by private report. phase should begin in sector, and improve the regulatory July 1992 for 10 months. environment for new investments. Environmental Assessment Category B. Lstere de 40.0 (R) Education Sector Adjustment - Consulting services will Project under lucation (Bank) Implementation of national strategy for be required. preparation.-- (onale et sustainable development of education and 1stere de training in line with needs of the Lseignement economy. Environmental Assessment rieur de la Category C. nologie et de echerche ntifique stry of Public 40.0 Health and Population Sector - Focussing Consultants will be Project under th and (Bank) on strengthening strategic management required. preparation. stry of Plan framewoZk, financial and human resources Territorial management, improving drug and other gement medical material distribution and strengthening of priority health programs. Environmental Assessment Category C. VERDE stry of 10.0 (N) Multi-Sector - Project will: Consulting services will Project identification ce, Ministry (IDA) (a) assist the Government in the second be required. mission scheduled for iblic phase of its public enterprise sector July 1992. lstration reform program begun under the Privatization Technical Assistance Project; (b) support civil service reforms; (c) help build economic management capacity: (d) support efforts at decentralization; and (e) help streamline institutions. Environmental Assessment Category C. try of 4.2 (R) Privatization Technical Assistance - Consulting services will Approved by the Executive ce and (IDA) Project will assist the Government in be required. Directors on June 4, ing designing a strategy for privatization 1992. and building its capacity to implement its public enterprise reform program. Environmental Assessment Category C. -8- Member Country, Amount & Implementing Probable Stage of Processing Agency Lender Project - Consulting Services Action on Procureme CAPE VERDE. (Cont'd) ENAPOR 7.5 (R) Transport/Infrastructure - The To be determined. Appraisal mission (IDA) project seeks to: (a) set up a new scheduled for June organization for efficient and effective 1992. Preparation maintenance of the road network; progress. (b) contribute to economic develop by (A PPF of US$710,00 reducing air, land and sea transport approved on January costs and rehabilitation of the Port of 1992 to finance Vale de Cavaleiros; (c) promote tourism; preparation activit (d) strengthen managerial capabilities of central ministries; and (e) alleviate water supply shortages. Total project cost is US$35.0 million. Environmental Assessment Category B. Ministry of 13.2 Education II - The objective of this To be determined. Project being ident Education (IDA) project is to outline support to primary education, and development of post primary education including expansion and enhancement of quality or secondary education. Environmental Assessment Category C. (ENAPOR) Empresa 18.8 (R) Public Infrastructure and Factors To be determined. Project has been re Nacional de (IDA) Upgrading - Upgrading of port facilities from the Lending Pi Administracio dos at Porto Grande, Mindelo Island, support Further reporting v Portos development of export procesing and discontinued. attract foreign investments in port based activities. Total project cost is US$30.0 million. Environmental Assessment Category B. Ministries of 9.2 Human Resources - Assist the Government Consulting services will Project being ideni Education and (IDA) in implementing its export promotion be required (estimated Health policy. Scope to include definition and at 55.5 staffweeks). implementation of the related training and manpower development strategy and program. Investments to be supported likely to include: (a) vocational training to meet demand for technologically skilled labor; and (b) management training. Environmental Assessment Category C. CENTRAL AFRICAN REPUBLIC Ministry of Public 30.0 (R) Transport Sector II - To deepen To be determined. Project has been p: Works & Transport (IDA) transport sector policy adjustments to in the Reserve Prol further strengthen institutional Further reporting development, and to continue discontinued. rehabilitation and maintenance of transport infrastructure started under the first transport sector project. Environmental Assessment Category B. Ministry of Rural 25.8 . (R) Agriculture Services - To support Consulting services will Approved by the Ex Development (IDA) strengthening of the Ministry of Rural be required. Directors on May 1 Development, and of research and 1992. Credit was extension services. Environmental on June 1, 1992. Assessment Category C. -9- mber Country, Amount & plementing Probable Stage of Processing and ency-' Lender Project 3 Consulting Services Action on Procurement 4 AD aistry of Public 25..0 (R) Transport Sector II - Follow up of To be determined. Project under rks & Transport (IDA) the Transport Sector Adjustment and preparation': Feeder Roads Project to sustain reforms' A PPF of US$850,000 was and liberilization of the sector. approved on February 21, Environmental Assessment Category B. 1992 to finance preparation activities. iistry of Public 10.0 (R) Municipal Development - Focusses on To be determined. Project being prepared. ks and (IDA) infrastructure upgrading in capital A PPF of US$800,000 was nsport city, emphasizing service provisions by approved on February 21, private sector; institutional building 1992 to finance and policy reform in the urban sector to preparation activities. the extent that macro-economic and conditions permit. Addresses critical environmental issues. Total project cost is US$40.0 million. Environmental Assessment Category B. be determined 15.0 (R) Basic Education (formerly Education To be deterihined. Appraisal mission (IDA) V) - Follow up operation to pursue scheduled for development of primary education, November 16, 1992. particularly improved quality. Emphasizes role of local communities and increased enrollment of girls. Environmental Assessment Category C. e determined 20.0 (R) Agricultural Research - To Consultants will be Project has been combined (IDA) strengthen crop, livestock, forestry and required (200 with the Agricultural. natural resource management.research ' staffweeks). Services Project. nationwide. Total project cost US$40 Further reporting will be million. 'Environmental Assessment discontinued. Category C. .stry of Health 20.0 (R) Population and Health - The project Consultants will be Sector work completed. (IDA) would aim to: (a) reorient health'care' required. Appraisal mission service to focus on the provision of an scheduled for July 1, adequate package of basic primary care 1992. services to a larger segment of the population; develop and promote an acceptable family planning strategy, including sensitization activities; and (c) develop complementary programs/ activities in the areas of food security (i.e., nutrition), health, and family planning education, focussed particularly on women. If necessary, implementation will begin in one or two pilot zones. Environmental Assessment Category C. Itry of 10.0 (R) Agricultural Services (formerly Consultants will be Project is being combined .ulture (IDA) Agricultural Research)- Promotion of required. (Estimated at with.the Agricultural effective agricultural support services 200 staffweeks.) Research Project. primarily focusing on research and ', Project under extension possibly with functional preparation. literacy. Total project cost estimated (Cofinancing will be at US$40.0 million. Environmental required possibly from Assessment Category C. . BADEA (Sudan), CCCE (France), EEC (Belgium), IFAD (Italy).) - 10 - Member Country, Amount & Implementing Probable Stage of Processing Agency Lender 2 Project Consulting Services Action on Procuremen CHAD (Cont'd) Ministry of Mines 30.0 (R) Petroleum/Power - to support Under an engineering Project under and Energy (IDA) implementation of a least cost product project approved in preparation. supply system and provide technical November 1990, assistance to strengthen the engineering consultants Engineering project Government's management of the power and have been selected to approved November 19 petroleum sector. Total project cost prepare three turnkey estimated at US$70.0 million. contracts. Environmental assessment completed under the Engineering Project. Environmental Assessment Category A. COMORDS Ministry of 13.0 (R) Population/Human Resources - Will Consultants have been Project under Health/Education (IDA) strengthen the primary health care selected. preparation. system, particularly the quality of maternal and child health/family planning services; finance community development activities such as construction/rehabilitation of social infrastructure and small-scale production activities; and establish an appropriate institutional and policy framework. Environmental Assessment Category B. COTE DIVOIRE MINAGRA 40.0 (N) Land Tenure - Full scale project to Consulting services will Project was identif (Bank) use the instruments developed under the be provided by DCGTX and December 1991, and pilot Land Tenure Project (previously MINAGREF. being prepared by F funded). The project will solve specific problems in agriculture, livestock, and forestry development. Environmental Assessment Category A. Office of the 50.0 (N) Telecommunications III - To be determined. Project under Prime Minister (Bank) Privatization of the telecommunications preparation. entity (ONT/CETELCOM); regulation of the sector and training. Environmental Assessment Category B. I Ministries of 5.0 Human Resources Management Support - To Consulting services will Project preparatioi General Education, (Bank) strengthen the capacity of human be required in the areas way. Higher Education resource technical ministries to of budgetary and Health and implement the ongoing Human Resource programming, public Social Services Adjustment Program. The focus is on management and school strengthening: (a) programming, panel research. planning and budgetingi (b) monitoring and evaluation of sector performance; and (c) monitoring and analysis of school processes and student learning. Technical advisers will emphasize skills, transfer, and in-service training.. Environmental Assessment Category C. - 11 - !ember Country, Amount & mplementing Probable Stage of Processing and gency ' Lender 2 Project 3 Consulting Services Action on Procurement ITE D'IVOIRE ont'd) inistry of 30.0 Economic Management Technical Assistance Consulting services Appraisal under way. conomics, Finance (IDA) - Technical assistance training and being identified. Planning; institutional support to Government inistry of Civil programs of structural and sectoral -. arvice & adjustment. Support to ministries p loyments. responsible for macroeconomic Lnistry of management, civil service reform and Lstice legal and judiciary reform. Environmental Assessment Category C. Lnistry of 20.0 National Agricultural Service - Support Consulting services will Project preparation under ;riculture and (Bank) for reorganization/reinforcement of the be obtained locally. way. imal Resources, current structure of key agricultural Lnistry of services (research, extension) to ensure entific the adequate supply and diffusion of !search, alternative technologies and cropping ofessional and systems. Environmental Assessment chnical Category C. ucation nistry of 20.0 (R) Road Maintenance and To be determined. Appraisal mission in the uipment, (Bank) Rehabilitation - The project will: field. ansport and 30.0 (a) halt deterioration of existing urism (METT) - (IDA) roads: (b) reform organizational structure of road maintenance, partly by privatizing specified activities; and (c) reduce rural transport costs by upgrading the maintenance of farm-to- market roads. Environmental Assessment Catagory B. Lme Minister's 15.0 (R) Privatization Support - Project is Consulting services will Approved by the Executive Eice, Ministry (IDA) in support of privatization primarily. likely be required for: Directors on May 5, 1992. Finance Project is a spin-off of the Economic (a) privatization Credit was signed on Management Project that requires program; (b) training in May 12, 1992. additional preparation of other foreign debt management; components. Environmental Assessment and (c) strengthening of Category C. Abidjan Stock Exchange. iistere des 50.0 Private Sector Energy - Would allow Consulting services Investors for the les, Industrie (Bank) government to have local gas resources required for: . development of the gas Energie, developed by the private sector to. o Engineering studies; field and for new ROCI reduce dependence on imported energy. o Offshore petroleum electricity generating Power supply reliability would be studies; . capacity discussing improved by selected private sector o Offshore pipeline formal proposition, investments. The project would lessen route surveys; and including technical, the environmental impact of energy o Others to be financial and consumption by moving away from liquid determined. contractural elements fuels and biomass to natural gas, as with Government. Studies well as encouraging additional private ongoing to determine sector investment in the energy sector. precise electricity Environmental Assessment Category B. component. Engineering studies being prepared. BOUTI istry of Health 8.0 Health - Project will: (a) strengthen Project will require Project under (IDA) delivery of primary health care and about 200 staffweeks of preparation. first level referral services; consulting services. (b) strengthen delivery of in-service training for staff; (c) strengthen institutional capacity of the Ministry of Health for sector planning, programming, budgeting and evaluation. Environmental Assessment Category C. -12 - Member Country, Amount & Implementing Probable Stage of Processing a Agency ' Lender I Project Consulting Services Action on Procurement EQUATORIAL GUINEA Directorate of 2.5 (R) Technical Assistance Petroleum II - To be determined. Negotiations complete4 Hydrocarbons (IDA) Project would include technical Board presentation assistance to: (a) monitor development scheduled for June 25 of Alba field in order to ensure maximum 1992. rate recovery; (b) find appropriate methods to use Alba Ass. Gas; (c) reform the energy sector framework; (d) improve the prices of petroleum product supply and distribution; and (e) follow-up on the exploration activities of oil companies operating in Equatorial Guinea. Environmental Assessment Category B. Ministry of 10.0 (R) Natural Resource Management and Consulting services will An identification rep Agriculture and (IDA) Conservation - Project would assist be required. was prepared in Janus Forestry Government in implementing a natural 1991. Some preparati resource management plan to assure both work is being underta an optimal production level from the with a Japanese Grant forest and conservation of the Further preparation u environment. Environmental Assessment will be undertaken vi Category A. CTF from Norway, including the environmental assessa for the project. ETHIOPIA To be determined 50.0 Parastatal Reform Technical Assistance - To be determined. Project preparation i (IDA) The project will provide technical way. assistance to enable the Government to define and initiate implementation of a program for public enterprise reform and divestiture. Environmental Assessment Category C. Ministry of Energy 50.0 (R) Calub Energy Development (formerly Consulting services will Appraisal mission and Mines (IDA) Natural Gas and Petroleum) - To supply be required. scheduled for LPG, gasoline, gasoil and electricity. September 17, 1992. Interfuel substitution component to replace domestic use of wood fuels with LPG, thus mitigating negative environmental impact of deforestation. Contribution to Ogaden Regional Development by installing electrification line to regional capital and providing local supply of petroleum products for energy and transportation sectors. Social actions program component to diversify income source and activities of poor women engaged in illegal cutting, transport and trade of fuelwood. Environmental Assessment Category B. - 13 - Member Country, Amount & !Implementing Probable Stage of Processing and lAgency Lender Project Consulting Services Action on Procurement ETHIOPIA l(Cont'd) Ethiopian Seed 55.0 (R) National Seeds - Would reinforce' To be determined. Appraisal completed. Corporation (IDA) capability of national research system Negotiations tentatively -to provide adequate breeder seeds of scheduled for July 1992. improved varieties; improve capacity to . produce high quality seed; stimulate demand for improved seed through improvements and promotion; and create an enabling institutional and policy framework to promote the evolution of the industry and promote private sector participation. Environmental Assessment Category B. inistry of 91.0 Highland Water Conservation - Soil and Consultants will be Project design to be griculture (IDA) water conservation support measures for required. reviewed in view of environmental protection and enhanced change in Government. productivity in the Highlands. Would comprise civil works, vehicles, equipment, technical assistance and training. Environmental Assessment Category: To Be Determined. inistry of 85.0 Roads Rehabilitation - The project would Consultants will be Awaiting confirmation of onstruction and (IDA) comprise: (a) civil works - required. project design from the Iusing rehabilitation of 198.5 km of the Assab- Government. Mille road; (b) technical assistance - construction supervision; consultancy services and trainting; and (c) local level transport - equipment, raw materials, training and pilot phase running cost. Project totals US$94.4 million with a foreign component of US$74.4 million. Environmental Assessment Category B. nistry of 30.0 Peasant Coffee Development - The project Consultants will be Project design to be ,ffee, Tea and (IDA) would strengthen government support required. reviewed in view of :ate Farm services for food and coffee production change in Government. 'velopment in the major coffee producing areas. Support would also be given to expanding washed coffee primary processing factories, rehabilitating coffee hulleries and improving export processing facilities. Environmental Assessment Category B. nistry of 50.0 (R) Population I - The project would Consulting services will *Appraisal report under anning and (IDA) strengthen Government capacity to be required. preparation. onomic undertake population programs, expand velopment service delivery and expand information activities. -Environmental Assessment Category C. -14- Member Country, Amount & Implementing Probable Stage of Processing an Agency ' Lender Project ' Consulting Services Action on Procurement GABON Ministry of 22.5 (R) Forestry/Environment - (a) better Consultants will be Negotiations completed Fisheries & (Bank) use of forestry resources through required. June 1, 1992. Board Forestry, Ministry implementation of management-plan in presentation scheduled of Environment, First Zone of forest area; (b) reinforce for June 30, 1992. Tourism and strategic planning, operational National Parks capability of Government institutions in the sector; (c) resume forestry and environment research; (d) make forestry and environment training more practical and relevant to needs of private sector; (e) undertake a number of critical environmental studies; and (f) support Government in the creation and maintenance of wildlife reserves. An environmental impact assessment was initiated in June 1991 and completed in February 1992. A PPF was approved in June 1-991 to finance preliminary studies needed to better define the scope of project components. Environmental Assessment Category A. THE GAMBIA Ministry of 10.0 (N) Economic Management SECAL - The To be determined. Identification under i Finance (IDA) sector adjustment credit would support the Government's program for sustained development. Environmental Assessment Category C. To be determined 15.0 (N) Banjul Port III - Modernization and To be determined. Identification under i (IDA) extension of Banjul's port facilities. Environmental Assessment Category: To Be Determined. Ministry of 10.0 Urban Environment - Project would: To be determined. Project under -Finance (IDA) improve living conditions through preparation. extension of infrastructure network and in sanitation; strengthen principal institutions in the urban sector and operationalize the new enabling legislation and regulation to facilitate administration of land and housing development; and strengthen key tourism institutions, etc. Total project cost is US$23.0 million. Environmental Assessment Category A. Ministry of 13.0 Agricultural Services - Further Consultants will be Appraisal report unde Agriculture (IDA) development of extension research and required (estimated at preparation. possibly credit- services nationwide. A 100 staffweeks). natural resources management component will address the issue of deteriorating soil fertility throughout the country. Total project cost US$15.0 million. Environmental Assessment Category C. - 15 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lander " -Project 3 Consulting Services Action on Procurement GHANA To be determined 15.0 Enterprise Development - Project will To be determined. Appraisal mission (IDA) promote export development in order to tentatively scheduled for build and broaden non-traditional export June 1992. base, and improve quality and productivity. 'Will also provide operational and' financial restructuring to potentially liable enterprises. Environmental Assessment Category C. Electricity 80.0 (R) National Electrification - Assist Consulting services were Project preparation under Corporation of (IDA) Government' in providing electricity from obtained under PPF to way. Appraisal mission Ghana (ECG) the national grid to small urban centers prepare feasibility tentatively scheduled for and rural areas in line with its policy study. October 1992. of expanding democratization at the- district capital level, and promoting development of areas outside of large urban areas. Also, assisting in strengthening and rationalizing sector institutions. Environmental Assessment Category B. Enviionm'ental 20.0 (R) Environment - Institutional Consulting services will Appraisal mission Protection Council (IDA) strengthening of the Environmental be required during completed. Negotiations (EPC) Protection Council (EPC) and launching project implementation. tentatively scheduled for .investment program in one or two high Financing will be August 1992. priority neglected sectors. Development provided by ODA, DANIDA. (Proposal includes of environmental resource management and financing from the Global information systems, programs for land Environment Facility and water management and coastal wetland (GEF) -- see Annex C.) management. Environmental Assessment Category B. Ministry of 45.0 Tertiary Education - The project would To be determined. Negotiations tentatively Education (MOE) (IDA) support Government reform of tertiary scheduled for August education, particularly universities and 1992. polytechnics, which will make them more A PPF of US$580,000 was relevant to national development and approved in October to consistent with lower educational finance expenditures levels, and substantially improve including consultant quality and cost effectiveness. services required to Environmental Assessment Category B. complete the preparation and planning of implementation, and strengthening of the Ministry of Education. Ghana Water and 37.0 Rural Water - To improve access to rural Consulting services are Project preparation under Sewerage (IDA) water supply and sanitation throughout being arranged to assist way. Corporation Ghana, through rehabilitation/ in preparation. construction of appropriate facilities and establishing community 'responsi- bility for operation and maintenance. Environmental Assessment Category B. Ministry of 35.0 (R) Livestock - To strengthen livestock Consulting services used Appraisal completed. Agriculture, (IDA) production through improvement of animal for preparation and pre- Negotiations tentatively Department of health, provision of animal watering appraisal. No further scheduled for September Animal Health and points, dry season feeding, breed requirements. 1992. Production improvement, and strengthening of the institutional framework for livestock production. Environmental Assessment Category B. ________________________________ n - 16 - Member Country, Amount & Implementing Probable Stage of Processing Agency - Lender Project Consulting Services Actioh on Procuremeni GUINEA Ministry of 30.0 (R) Natural Resource Management Consulting services will FAO/CP has completed Agriculture and (IDA) (formerly Natural Resources be required for first preparation Animal Resources Management) - Support for a program of preparation of: (a) a mission. Project bri (MARA) action to protect forests and soils. woodfuel master .plan for expected in June 199 Environmental Assessment Category A. Conakry; and (b) a Second preparation socioeconomic study. mission planned for The services of a Rural November 1-23, 1992. Sociologist will also be required. Ministry of 11.0 Technical Assistance Communications - Consultants currently Appraisal mission in Communications (IDA) Reorganization of telecommunications working. Other field. sector. Program for strengthening new assistance and A PPF is currently entity to manage and operate the sector. management of SOTELGUI effective. Environmental Assessment Category B. and OPG (including search for private partners) will be required;,also, engineering studies. To be determined 26.0 Urban Environment and Sanitation Preparatory studies Pre-appraisal missioi (IDA) Improvement - To improve the physical financed by Japanese scheduled for Decemb and economic environment of urban Grant, which was signed 1992. centers through strengthening of on February 4, 1992, municipal institutions, the development under way. of the role of the private sector, and the rehabilitation of priority infrastructure and services. Environmental Assessment Category: To Be Determined. Ministry of Plan 7.3 (R) Public Enterprise Sector Consultants will be Negotiations complet and Finances (IDA) Rationalization and Privatization - To required for preparation Board presentation help the Government formulate and and implementation. scheduled for June 2 initiate the Public Enterprise Sector 1992. Rationalization Program to strengthen key institutions for implementing the program. Environmental Assessment Category C. Ministry of Public 25.0 Health II - Policy-based operation Consulting services will Project preparation Health and (IDA) focussing on strengthening investment be required for way. Appraisal miss Population and recurrent budget planning, human preparation. scheduled for June 1 resources management, renovating PPF is effective. depleted infrastructure and strengthening priority health programs. Environmental Assessment Category C. Ministry of Trade, 30.0 (R) Transport and Urban Infrastructure - To be determined. Appraisal mission in Transport and (IDA) (a) Priority urban infrastructure field. Tourism investments in Conakry and secondary cities; (b) a tranche of additional road upgrading as defined in the long-term road development plan; (c) priority investments of transport parastatals, including fishing port in Conakry; and (d) improving urban management and environment, including road safety and traffic management. Environmental Assessment Category B. - 17 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project 3 Consulting Services Action on Procurement GUINEA (Cont'd) Ministry of 20.8 Nat ional Agricultural Export Promotion - Consulting services will Negotiations completed Planning and (IDA) Project to strengthen incentives be required to assist May 4-8, 1992. Board Finance framework and supply response in the Government in presentation scheduled agricultural export sector. Project project management,, for end June 1992. would include: (a) institutional including support to building for the private sector; small and medium-sized (b) support to production; and enterprises and (c) special programs. Environmental institutional support. Assessment Category B. ENELGUI 50.0 (R) Power II - Project would seek to: Consulting services will Negotiations completed. (IDA) (a) restructure institutional and be required. Board presentation regulatory framework; (b) rehabilitate scheduled for July 7, power utility infrastructure for 1992. industrial and commercial activity in the main development zone (Conakry/ Kindia region); and (c) technical assistance to ENELGUI management. Environmental Assessment Category B. GUINEA-BISSAU Bank of Guinea- 7.2 Economic Management - To strengthen To be determined. Approved by the Executive Bissau, Ministry (IDA) economic management and institutional Directors on March 19, of Economy and capacity. Environmental Assessment 1992. Finance Category C. Ministry of 31.8 SAC III - Further policy reforms being To be determined. Appraisal mission Economy and (IDA) taken under SAL I and SAL II. tentatively scheduled for Finance Environmental Assessment Category C. September 1992. Ministries of 13.0 (R) Social Sector - To further Consulting services will Appraisal mission 'Education, Health (IDA) rehabilitation of health facilities; be required-for completed. Negotiations and Women's information, education and architect and health . tentatively scheduled for Affairs communications; training; the social specialists. December 1992. sector fund for social programs; and income generating activities for women. Environmental Assessment Category C. Ministry of Rural 15.0 Natural Resources Management - Project Consultants identified Project under Development and (IDA) would lay foundation for improved for preparation and preparation. Pre- Agriculture - management of natural resources to implementation. appraisal scheduled for promote sustainable agriculture. Consultants will also be November 1992. Components would be: (a) policy reform needed for. in land tenure; (b) institutional implementation. strengthening; (c) a pilot program of community-based resource management; and (d) establishment and,management of timber resources. Environmental Assessment Category B. I1 -18 - Member Country, Amount & Implementing Probable Stage of Processing Agency Lender 2 Project s Consulting Services Action on Procuremer KENYA Kenya Ports 85.0 Transport Corridor - To rehabilitate Consultants shortlisted Project under Authority (KPA), (IDA) container berths, additional container for PPF studies. preparation. Kenya Railways handling equipment, construction of Consulting services will Corporation container freight station, rehabilita- be required during (Department of tion of shunting locomotives, new implementation. Customs) mainline locomotives, improvements to KR communications,. and customs and transit reform. Also, management support to KPA - and KRC, and institutional program. Environmental Assessment Category: To Be Determined. Ministry of 21.0 Parastatal Reform and Private Sector Consulting services will Appraisal mission Finance (IDA) Development Technical Assistance - be required for currently in the fif Operation will provide technical privatization, assistance to: (a) staff technical unit regulatory reform. for privatization; (b) implement reforms for strategic parastatals; (c) auditor general (state corporations) to improve auditing functions; (d) registrar general to improve data bases; (e) the capital markets' authority; (f) support legal work on regulatory reform in the Attorney General's office. Environmental Assessment Category C. To be determined Up to Agricultural Marketing - Project would To be determined. Initial mission rep 70.0 facilitate implementation of policy, received. Project (IDA) legislative and structural reforms for preparation. strengthening the industry and for sustainable growth. Environmental Assessment Category B. Ministry of Health About Health and Nutrition Sector Adjustment - Consultants will be Project preparation 80.0 Support widespread sectoral reform. required and are likely start once the Heal (IDA) Environmental Assessment Category: C to be financed under the Rehabilitation Proj Health Rehabilitation becomes effective. Project. Ir LESOTHO Ministry of 9.8 (R) Infrastructure Engineering - To Engineering and Board presentation Planning (IDA) strengthen highway, water and public institutional studies in scheduled for June building sectors and prepare for a the three sectors. 1992. rehabilitation and maintenance project for FY94. Environmental Assessment Category B. Ministry of 25.0 (R) Infrastructure Maintenance (formerly To be determined. Project being ident Planning (IDA) Infrastructure Rehabilitation (Cofinancing will b Maintenance) - To prepare programs for . required.) rehabilitating and maintaining roads and other infrastructure, and strengthening long-term planning of infrastructure investments. Selected rehabilitation/ investment will also be included. Environmental Assessment Category B. - 19 - ember Country, Amount & mplementing Probable Stage of Processing and Agency Lender Project s Consulting Services Action on Procurement LESOTHO (Cont'd) Ministry of 10.0 (R) Public Sector Financial Management - To be determined. Appraisal report under Finance (IDA) Expansion of pilot program for improving preparation. budgetary management and financial (Cofinancing of about reporting in government, and US$10 million will be strengthening linkages between budgetary required.) control and development planning. Training in the Government's new financial management system will be emphasized. Environmental Assessment Category C. fADAGASCAR inistry of To Be Second Irrigation Rehabilitation - To be determined. Project preparation under gricultural Deter- Project is Phase II of ongoing project way. Iroduction and mined (CR 1589-MAG). Following the completion grarian Reform of irrigation sector study, the project IMPARA) will support the rehabilitation of - further existing medium scale irrigation schemes, and ensure the institutional structure for sustainable maintenance activities over future years. Self financing by farmers to be developed. Environmental Assessment Category: To Be Determined. inistry of 27.5 (R) Education Sector (CRESED II) - To be determined. Project has been placed Jucation (Bureau (IDA) Project seeks to continue to intensify in the FY95 Lending Is Projets support for sector reform package of Program. Further !ucation) first education sector credit with reporting wiLl be special emphasis on in-service training, discontinued. book production, improved administration, university reform, and primary school construction. Environmental Assessment Category C. Lnistry of Urban 46.0 (R) Second Urban - To develop the Consulting services will Project under ivelopment and (IDA) capacity building of local governments be required. preparation. urism to plan and manage their urban development. Environmental Assessment Category B. nistry of Posts 34.0 (R) Telecommunications - Financing of Consulting services will Project under d (IDA) investments in the telecommunications be required. preparation. lecommunications sector and support for sectoral policy reforms and institutional assistance. Environmental Assessment Category B. distry of 20.0 Export Crop Promotion - Will assist Consulting services Project preparation under riculture (IDA) producers, transformers and exporters in will be required. way. prospecting markets, developing new products or improving existing ones, and investing in the agro-industrial sector. Environmental Assessment Category B. Iaque Centrale de 40.0 Financial Sector Development - To To be determined. Project under IRepublique (IDA) support further reform in the financial preparation. nocratique de and industrial sectors. Environmental Jagascar Assessment Category C. -20- Member Country, Amount & Implementing Probable Stage of Processing Agency Lender 2 Project ' Consulting Services Action on Procureme MADAGASCAR (Cont'd) Ministry of 3.6 (R) Rural Finance - Project, on a pilot Specialists in rural Appraisal report un Agriculture (IDA) basis, to support and promote a,rural savings and loans and preparation. savings and loan movement based on the credit union existing and new grass root movement will be institutions. Environmental Assessment required. Category C. Ministry of 68.5 (R) Petroleum Sector Reform - Will Consultants have been Appraisal report un Industry, Energy (IDA) include reform of the petroleum pricing contracted. preparation. and Mines/SOLIMA, and taxation system, new policies to (Petroleum increase efficiency in petroleum supply Company) and distribution, rehabilitation and improvement of the refinery, investments in petroleum transport and distribution and institutional strengthening of MIEM and SOLIMA. Since the project will upgrade existing facilities. environmental effects are limited. Environmental Assessment Category B. Ministry of 47.1 (R) Transport Sector - To improve Consultants are not Appraisal mission Transport (IDA) infrastructure for coastal shipping, air required at this stage. tentatively schedul and rail transport. Environmental 'late FY92. Assessment Category B. Ministry of 22.8 (R) Manpower Training (formerly Consultants have been Approved by the Exi Education (IDA) Vocational Technical Education) - selected. Directors on June Develop vocational training and 1992. technical education, including establishment of coordination structure and training funds; support for training school for senior civil servants. Environmental Assessment Category C. Office of the 20.0 (R) Food Security and Nutrition - Consultants have been Re-appraisal missii Prime Minister (IDA) (a) Address short and medium-term selected (about 200 tentatively schedu: problems of rural and urban food staffweeks). November 1992. insecurity; (b) Support child nutrition programs; (c) Support nutrition education and other programs to improve micro-nutrient intake; (d) Support research and monitoring of nutrition issues; (e) Begin to address the intra- household resource allocation issues. Environmental Assessment Category C. Central Bank of, 120.0 (R) Private Sector Environment Consultants likely to be Project placed on Madagascar (IDA) Adjustment (PRIVAC) Credit - To required. due to political t consolidate the reforms undertaken so of 1991, and ongoi far' and to support the next stages in political transiti the reform of the incentive system and regulatory environment in support of private sector activities. Environmental Assessment Category C. - 21 - ember Country, Amount & plementing Probable Stage of Processing and gency Lender 2 Project 3 Consulting Services Action on Procurement ADAGASCAR Cont'd) inistry of About (R) Energy II - The project will Consultants have been Project preparation is adustry, Energy 54.5 continue the rehabilitation of the power appointed for under way. Iad Mines (IDA) network and may include a new hydro- preliminary electric power plant (Ambodiroka). as environmental studies well as investments in transmission and relating to Ambodiroka. distribution, based on a least-cost power master plan; dissemination of the improved carbonization techniques - developed at the Haut Mangoro Fanalamanga's plantation; industrial energy efficiency projects; and continuity for technical assistance for energy and power systems planning. Total project cost estimated at US$80.0 million. The engineering studies for the Ambodiroka power plant, which are being undertaken at this time, include a detailed environmental assessment. The dissemination of improved carbonization techniques will have positive environmental effects. Environmental Assessment Category B. IAWI aistry of 55.0 Trade and Distribution Adjustment - Consulting services will nance (IDA) Final phase of adjustment program with be required.Project emphasis on rationalization of trade and under preparation. distribution sectors and completion of (Cofinancing of about liberalization of domestic transport. US$70.0 million will be Environmental Assessment Category C. . required.) iistry of 50.0 (R) Institutional Development II (ID II) Consulting services will Appraisal mission iance (IDA) - Project will continue the efforts be required. scheduled for September begun under (ID I) to strengthen 1992. Government capacity for economic and financial management, and to support the Government program to improve the public sector. Environmental Assessment Category C. istry of 25.0 (R) Financial Services - Project will Consultants have been Appraisal mission in the iculture (IDA) increase agricultural production and appointed. field. other productive rural activities by (Cofinancing of about providing financial and technical US$5.0 million will be support additional credit for rural required.) enterprise assistance. Government will strive toward improving the policy and institutional framework for rural financial intermediation. Environmental Assessment Category C. etricity Supply About (R) Power V - Will provide for expansion To be determined. Approved by the Executive nission; 55.0 and rehabilitation of power generation, Directors an June 17, artment of (IDA) transmission and distribution and 1992. aomic Planning provide support to energy planning. A (Cofinancing of about Development final report on field studies for US$126.0 million will be environmental assessment has been required, of which completed. Environmental Assessment US$41.6 million has yet Category A. to be confirmed.) - 22 - Member Country, Amount & Implementing Probable Stage of Processin Agency ' - Lender * Project ' Consulting Services Action on Procurea MALAWI (Cont'd) Ministry of Local 24.0 (R) Local-Government Development To be determined. Approved by the Ex Government (IDA) Central objective will be strengthening Directors on June of local government to finance essential 1992. setvices and manage traditional housing (Cofinancing of area programs on a self-sustaining US$6.5 million wil basis. Some elements such as required.) rehabilitation of sewerage treatment and solid waste services will have positive Seffects on environment. Environmental Assessment Category C. Ministry of 40.0 (R) Agricultural Services - Will Consultants have been Appraisal mission Agriculture (IDA) continue support for strengthening appointed to prepare scheduled for June smallholder services on a national level project. 1992. and build on current programs to improve (Cofinancing of at the national research, extension, and US$14.0 million wi key inputs (especially fertilizers and required.) seeds) credit services to alleviate poverty and food insecurity through increased agricultural productivity of an increased proportion of smallholders. It is unlikely that project will result in significant environmental impact project will support integrated pest management. Environmental Assessment Category B. Ministry of 120.0 (R) Entrepreneurship Development and *Consultants in labor and Board presentatioi Finance (IDA) Drought Relief Program (formerly capital market will be scheduled for Jun Entrepreneurship and Capital Market) - needed. 1992. Project will provide continued support (Cofinancing of al for Malawi Adjustment Program, with a US$15.0 million w: focus on factor markets and low income required.) groups. US$50.0 million is included for drought relief. Environmental Assessment Category C. *- MALI Ministry of Mines, 3.0 (R) Mining Sector Capacity Building - Consulting services will Approved by the E Hydraulics and (IDA) The project is technical assistance to be required. Directors on June Energy help the Government promote foreign and 1992. local investment in the sector. Environmental Assessment Category C. Ministry of Civil 20.0 (R) Public Works and Capacity Building - To be determined. Approved by the E Service and (IDA) The project will finance a program of Directors on May Employment public works to be carried out by the 1992. private sector using labor-intensive technique to create employment. Total project cost is US$28.2 million. Environmental Assessment Category C. Institut 29.0 Agricultural Research - To strengthen Consultant will be Project under d'Economie Rurale (IDA) crop, livestock, forestry, and natural required (estimated at preparation. (IER) resource management research nationwide. 200 staffweeks). (Cofinancing will Total project cost estimated at- required possibly US$30.0 million. Environmental FAC and USAID.) Assessment Category C. - 23 - aber Country, Amount & ,lementing Probable Stage of Processing and Incy Lender Project Consulting Services Action on Procurement ,nt'd) istere des .35.0 Private Sector Development - An Consultants have been Appraisal report under lances et du (IDA) institutional support component would used to prepare project. preparation. merce.- provide technical support to private Additional consulting enterprises through a cost sharing services will be mechanism; strengthen the Chamber of required. Commerce and Industry; improve the PE privatisation process through the Public Enterprises Bureau; strengthen the Bankers' Association; and improve the information database-for banks and train bank staff. A studies component would explore the potential for initiating mutual savings and credit schemes in urban areas and examine the appropriate modalities for financing housing. Environmental Assessment Category B. ,stere de 20.4 (R) Natural Resources Management - Consultants will be Approved by the Executive ivironnement et (IDA) Finance a wide range of multi-sectoral required (estimated at Directors on May 26, eveloppement - natural resource management activities 200 staffweeks). 1992. at village, departmental and national (Possibility of levels. To include field operations, cofinancing with Caisse training, data collection and analysis Centrale (CCCE; France), and institutional development. Total Deutsche Gesellschaft fur project cost is estimated at Technische Zusammenarbeit US$32.0 million. The prolect has been (GTZ, Germany), United specifically designed to have a strongly Nations Sahelian Office positive environmental impact. (UNSO), and United Environmental Assessment Category C. Nations Development Programme (UNDP).) stry of Public 70.0 (R) Infrastructure/Transport Sector - Consultants will be Project being identified. s and (IDA) Would support preparation of required for preparing ;port comprehensive three year investment the different project program focusing on maintenance of components. existing infrastruc-ture and improved (15 staffweeks) management of sector parastatals, based on detailed action plans. The problem of urban and interurban/international transport would be addressed. Total project cost is US$80.0 million. Environmental Assessment Category B. try of- 35.0 (R) Irrigation Promotion - Promotion of Consultants will be Pre-appraisal mission ulture, (IDA) private irrigation and selected required (estimated at postponed until December took and rehabilitation of some publicly 200.staffweeks). 1992. Project onment constructed irrigation schemes. Total preparation will only project cost estimated at begin when preliminary US$40.0 million. Environmental studies on irrigation Assessment Category A. have been completed by a working group in the Malian Ministry of Agriculture, as agreed with FAO/CP. A PPF has been processed to fund preparation activities through local consultants. (Cofinancing will be - required. Possibly from KfW and FED.) - 24 - Member Country, Amount & Implementing Probable Stage of Processing Agency Lender Project s Consulting, Services Action on Procuremei MAURITANIA To be determined 10.0 (R) Construction Industry Development - To be determined. Appraisal mission (IDA) Project will carry out labor-based works scheduled for June for the Ministry of Works and the City 1992. Council of Nouakchott. Would also (A PPF of US$125,00( reform and streamline procedures for approved April 3, 11 contract management, and develop the assist in financing domestic construction industry. Total preparation activit4 project cost is US$19.0 million. Environmental Assessment Category B. SONELEC/Ministry 11.5 (R) Water Supply - Reinforce Nouakcnott To be determined. Approved by the Exe4 of Interior (IDA) water supply system, rehabilitate water Directors on June 1 and electricity system in interior 1992. centers, and strengthen SONELEC through technical assistance. Total project cost is US$98.7 million. Environmental . Assessment Category B. To be determined 17.0 Agricultural Services - Improvement of Consultants will be Project under (IDA) research and extension, possibly also required (estimated at preparation. crop protection and agricultural 150 staffweeks). (Cofinancing from B: education nationwide. Total project (Germany), and FAC cost estimated at US$25.0 million. (France) possible.) Environmental Assessment Category C. To be determined 17.0 Irrigation Promotion - Development of Consultants will be Project preparation (IDA) private irrigation plus selected required. (Estimated at expected to take pl rehabilitation of publicly constructed 100 staff weeks). when all conditions irrigation schemes. Total project cost release of agricult estimated at US$40.0 million. Secal second trancb Environmental Assessment Category A. been met. (Cofinancing will b required. Possibly KfW and FED.) MAURITIUS To be determined *10.0 Technology I - This project will provide Consulting services will Reconnaissance/ider (Bank) assistance to build capacity to: be required. cation under way. (a) assess technology needs: (b) obtain technology information (c) select and acquire technology; and (d) manage technology transfer and dispersion. Environmental Assessment Category: To Be Determined. Ministry of Up to (R) Education Sector - Action would Consultants may be Appraisal mission I Education and 20.0 support implementation of the Education required. field. Science (Bank) Sector Master Plan (ESMP). Currently under preparation by the Government of Mauritius. Environmental Assessment Category C. Mauritius Sugar 15.0 (R) Sugar Energy Development - The Consulting services will Approved by the Exi Authority (Bank) project would: (a) establish a bagasse- be required for detailed Directors on March cum-coal field power plant at a sugar engineering of power 1992. factory in the southern part of the plants. (Global Environmeni island: (b) modernize sugar mills and Facility financing increase surplus bagasse through US$3.3 million appi investment in improved steam generation by the Regional Vig and utilization (c) develop technology President.) for biomass utilization; and (d) strengthen institutions. Environmental Assessment Category A. - 25 - mber Country, Amount & "plementing Probable Stage of Processing and ency Lender 2 Project s Consulting Services Action on Procurement nistry of Health 75.0 (R) Second Health and Nutrition - Consulting services will Project under - (IDA) Development of institutional capacity be required. preparation. Appraisal including strengthening health, program mission scheduled for management and planning, technical September 1992. assistance and training and improved implementation in collaboration with NGOs. Project funds for: (a) rehabilitation equipment for health posts and rural hospitals: (b) limited support for urban health infrastructure; (c) health manpower training; (d) drugs and medical supplies availability and distribution; and (e) support to special health programs (communicable disease control andesafe motherhood). Environmental Assessment Category C. ional Planning 12.0 (R) Food Security Capacity Building - To Consulting services, will Appraisal mission mission (CNP) (IDA) gradually increase, within low financial be required. returned. Appraisal and human resource availability, the report under preparation. capacity within institutions, to (Cofinancing will be understand the nature and magnitude of required.) the country's food security problems, the main affected groups, methods used to measure food security, and types of policies/activities needed to begin addressing identified issues. Environmental Assessment Category C. ILstry of 7.0 (R) Maputo Corridor - Project will Investment banking and Negotiations under way. Isport and (IDA) support a two-phase program to privatize consultancy services launications the provision of service on the Maputo will be required. Corridor (the state-owned railways and ports company). Under the first phase, the performance potential of the system and the mix of private sector and public sector participation will be assessed. The second phase will support transactions to effect the agreed scope of privatization. Environmental Assessment Category C. o de 150.0 (R) Mogambique Financial Sector. Consulting services will Initial identification abique/ (IDA) Adjustment - To support the financial be required in the areas mission planned for stry of sector reform program including of informal credit, August 1992. nce strengthening,of the Central Bank, commercial banking, bank development of monetary policy restructuring, instruments of control, and insurance exchange restructuring of the state owned control and other areas. commercial banks and development of competition in the banking sector. Environmental Assessment Category C. rnment of 30.0 (R) Rural Rehabilitation - Consultant have been Appraisal mission nbique (IDA) Rehabilitation of rural infrastructure appointed. scheduled for June 25, and productive structures, and 1992. reactivate production services in restricted number of PDP districts. Project components would include: (a) reconstruction/rehabilita-tion of rural infrastructure; (b) rehabilitation of agricultural support services; and *(c) technical assistance. Environmental Assessment Category B. - 26 - Member Country, Amount & Implementing Probable Stage of Processing 4 Agency Lender Project Consulting Services Action on Procuremenl MOZAMBIQUE (Cont'd) Ministry of 60.0 (R) Capacity Building - To create Consulting services will Appraisal report undi Education/Eduardo (IDA) expanded development capacity with be required. preparation., Mondlane special emphasis on the public sector. Negotiations tentati, University Project likely to include the following scheduled for July 21 components: (a) donor-supported 1992. incentives for senior civil servants; (Cofinancing of aboul (b) selected improvements at the US$10.0 million is bi university; (c) special enrichment sought.) programs for promising secondary school students; (d) short in-service and on- the-job training for public and private employees; and (e) strengthening of legal institutions and legal skills training. The project would entail policy reforms in the areas of public pay and employment and in the management of foreign technical assistance. Environmental Assessment Category C. Ministry of State 14.0 (R) Urban - Engineering credit will Consulting services Appraisal mission in Administration & (IDA) provide: (a) technical assistance and (480 staffweeks) field. Ministry of training for urban management and will be required. Construction and institutional strengthening; Water (b) technical assistance and financial support for environmental rehabilitation; and (c) financing for municipal or districts governments for specific infrastructure and services needs. Probable total cost US$20.0 million. Environmental Assessment Category: To Be Determined. Ministry-of. 35.0 Agricultural Services Rehabilitation and Consultant services will Approved by the Exec Agriculture (IDA) Development - To support the Government be required. Directors on Februai of Mozambique's efforts to rehabilitate 1992. and develop agricultural services; reverse the decline in production of foodcrops and cotton thus reducing poverty and improving food security; and strengthen local capacity to formulate and implement agricultural development activities. Total project cost is US$40.6 million. Environmental Assessment Category B. Ministry of 74.3 (R) First Roads and Coastal Shipping - Consultants will be Approved by the Exe4 Construction and (IDA) Technical assistance and studies for required for design of Directors on June 4 Water, Ministry of rehabilitation and maintenance of civil works, training, 1992. Transport and selected feeder roads and sections of and for studies, (Cofinancing being Communications, the national trunk road network and procurement management, to cover financing Ministry of civil works for rehabilitation of small and technical assistance Finance coastal shipping ports. Also, studies in management areas for for improvement of road transport and both roads and coastal intermodal facilitation. Environmental shipping. Assessment Category B. Bank of Mozambique 180.0 (R) Economic Recovery - Support for Consulting services will Approved by the Exe (IDA) Government's economic rehabilitation be required for banking Directors on June 1 program. Environmental Assessment sector reform, reform of 1992. Category C. the foreign exchange allocation system, privatization and restructuring of state enterprises. - 27 - aber Country, Amount & lementing Probable Stage of Processing and fncy Lender 2 Project 3 Consulting Services Action on Procurement be determined 35.0 Water II - Strengthening of the Water To be determined. Project under (IDA) Supply Authority (SUE) in management and. preparation. cost recovery and long term planning aspects. Financing SUE's investment program with other doners. Total project cost is US$35.0 million. Environmental Assessment Category B. -Governmental 10.2 (R) Private Irrigation - Development of Consultants will be Negotiations scheduled hcy (IDA) private irrigation (a) small-scale, by required (estimated at for August 1992. low-lift pumping from shallow aquifers; 38 staffweeks). (Cofinancing with CCCE (b) large-scale, by pumping from the (France).) Niger River. Total project cost estimated at US$13.5 million. Environmental Assessment Category B. Lstry of 18.0 (R) Agricultural Services - Promotion of Consultants will be Approved by the Executive Lculture and (IDA) effective agricultural support services required (estimated at Directors on April 21, astock nationwide, primarily focussing on 150 staffweeks). 1992. Credit was signed extension. Total project cost estimated on June 12, 1992. at US$19.8 million. Environmental Assessment Category C. 'stry of Plan 20.0 Municipal Infrastructure - The project Consultant will be- Project under (IDA) will strengthen technical capabilities required for project preparation. of municipalities and their ability to preparation, technical mobilize local resources, increase assistance for design productivity of self-employed artisans and supervision of and micro-enterprises. Total project works, training and for cost is US$50.0 million. Environmental studies. Assessment Category B. 3tere de la 17.6 (R) Population - The project will Consultants will be Approved by the Executive 2 Publique, (IDA) improve population planning and program required in the IEC-mass Directors on April 30, stere du Plan, development, develop and extend family media production, 1992. Credit was signed stere des planning services and maternal health training management and on May 22, 1992. tres Sociales services, and support associated planning. (Cofinancing is expected la Promotion programs to improve the status of women. from UNICEF and possibly Femme Environmental Assessment Category C. from the Belgian Government.) tere de 25.0 Human Resources SECAL - Continued Consultants will be Negotiations date to be cation (IDA) support to expand and improve quality of required during determined in light of ale primary education; restructuring of implementation. progress of discussions technical and vocational education and with Government regaiding consolidation and quality improvement in policy reform package. higher education. Environmental (Possibility of co- Assessment Category C. financing from CIDA, FAC, Germany, the Netherlands and Norway.) determined . 51.1 SAL II - Support further adjustment of To be determined. Project identification. (IDA) the economy by extending policy changes will commence when to new areas such as industry and trade, situation permits. and the banking sector while deepening civil service reform in agriculture and public resource management. - Environmental Assessment Category C. -28- Member Country, Amount & Implementing Probable Stage of Processing Agency Lender 2 Project 3 Consulting Services Action on Procuremei NIGER (Cont'd) Ministere de 16.6 Natural Resource Management - Finance a Consultants (estimated Project under 1'Agriculture et (IDA) wide range of natural resources at 400 staffweeks) will preparation. de l'Elevage management activities at village, be required. (Cofinancing with C1 departmental and national levels. This (France), NORAD (No will include field operations, training, and USAID (US), DAN data collection and analysis and (Denmark), and GTZ institutional development. Total (Germany).) project cost estimated at US$27.0 million. The project has been specifically designed to have a strongly positive environmental impact. Environmental Assessment Category C. Ministry of Public 30.0 Transport Sector II - Project objectives Consultants required to Negotiations tentat Works; Ministry of (IDA) are: (a) to redirect public expenditure design and supervise rescheduled for Oct Transport in road sector to maintenance; (b) to road works, elaborate 1992. increase user cost recovery: and (c) to and support execution of consolidate institutional building action plans for achivements. The project will finance a improving transport and three-year tranche of investments and a promote local maintenance program. Total project cost contractors, and provide US$193.5 million. Environmental technical assistance to Assessment Category B. institutional development. NIGERIA Federal Ministry 100.0 (R) Health System Fund II'(formerly Consulting services will Pre-appraisal miss of Health (IDA) Secondary Health Care) - Project seeks be required for studies completed. Apprai to: (a) improve the primary and health and technical mission scheduled care system through rehabilitation of assistance. June 29, 1992. existing facilities; (b) establish a national health equip- ment and repair system; and (c) improve health management and administration at the federal, state and local government levels. Environmental Assessment Category C. Federal Ministry 100.0 (R) Secondary Education - Support to To be determined. Preparation comple of Education (IDA) Government's education development Appraisal mission program for: (a) upgrading the quality scheduled for Nove of secondary education; (b) moving 1992. - towards universal basic education; (c) improving resource allocation, distribution and use; (d) strengthening planning and management; and (e) institutional development. Environmental Assessment Category C. Federal Ministry 20.0 (R) Economic Management - To provide To be determined. Preparation/pre-al of Finance & (IDA) technical assistance in support of mission completed. Economic preparation of projects for Bank Appraisal mission Development financing,, improving implementation of required as suffi( (FMFED) ongoing projects and public enterprise progress was made reforms, and broader economic reforms preparation/pre-al and important studies in the areas of mission. Negotial debt relief, budget and expenditure completed. Board monitoring and the financial sector. presentation schei Environmental Assessment Category C. for July 7, 1992. - 29 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project 3 Consulting Services Action on Procurement 4 NIGERIA (Cont'd) Federal Ministry 100.0 (R) State Roads II - Upgrading, For provision of Appraisal scheduled for of Works and (IDA) rehabilitation and maintenance of state technical personnel, June 1992. Housing and State roads in Oyo and Osun States with design and supervision Ministries of . limited construction of new roads. of civil works. Works Technical assistance to State Ministries of Works for strengthening planning, management and accounting function. Environmental Assessment Category B. Lagos/State 60.0 (R) Lagos Drainage and Sanitation - Consulting services will Appraisal mission Ministry of (IDA) Investments in stormwater drainage. be required for -studies scheduled in the field. Environment and Technical assistance could provide and technical Negotiations tentatively Physical Planning institutional support and strengthening, assistance. Details to scheduled for November particularly in the fields of management be determined. 1992. and design and operation of sanitary landfills; improvement of maintenance of stormwater drainage system; design of pilot urban renewal and planning of further. developments; further developmentand design of sanitary sewerage investments, where feasible; further stormwater drainage design; improved revenue generation measures; and city managements. Environmental Assessment Category B. Ministry of Works 75.0 (R) Lagos Urban Transport - To improve Consulting services have Project preparation under and Transport . (Bank) supply and productivity of urban been secured. way.- Appraisal mission (Lagos State transport. Project would support: - scheduled for September Government) (a) improvements in efficiency of . 1992. transport infrastructure through priority road maintenance and rehabilitation; and traffic management and traffic flows enforcement; (b) facilitate integration of urban' transport elements and reduce traffic congestion; and (c) support institutional reforms and human resource development. Environmental Assessment Category B. Rigerian Railway 150.0 Railways - The main objectives of the Consulting services will Project preparation under Corporation (Bank) project are to support the institutional be required. way. Appraisal mission strengthening of NRC and to finance a - scheduled for September rehabilitation and commer-cialization 1992. program (locomotives, wagons, track, . telecommunications, workshops). The project will support the commercialization program including financial restructuring, and improvements in its organization, corporate planning, and operational capabilities. Environmental Assessment Category B. ederal Ministry 20.0 (R) Development Communication - Support Consultants will be Appraisal mission Information (IDA) to pre-school education including required for upgrading scheduled for June 30, instructional programming; and building studios, program 1992. capacity for IEC activities. development, monitoring Environmental Assessment Category C. and evaluation, and supporting research. - 30 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement NIGERIA (Cont'd) National Electric 150.0 (R) Power VIII - Rehabilitation of Consultants will be Appraisal completed. Power Authority (Bank) generation, (KAINJI Hydroelectric Power required. Negotiations tentativel3 Station), transmission and distribution scheduled for January facilities. Expansion of transmission 1993.- and distribution network. Environmental Assessment Category B. Federal Department 42.5 (R) Agricultural Technology Support - Short-term consultants Approved by the Executi of Agriculture and (Bank) Strengthen the institutional environment will be needed to assist Directors on June 9, Rural Development, and operational activities to adapt . project implementation 1992. State Ministries improved technology packages and their in adaptive research, of Agriculture and delivery system to meet location- monitoring and Natural Resources specific needs of farmers. evaluation, financial Environmental Assessment Category B. accounting, and staff development and training. Federal Department 67.5 (R) Fadama Development - Extending Consultants will be Approved by the Executi of Agriculture and (Bank) small-scale pump irrigation to a maximum required in project Directors on March 26, Rural Development, of 100,000 ha of fadama. Environmental implementation for 1992. Signing expected State Ministries Assessment Category B. design and supervision end June 1992. of Agriculture and of road construction and Natural Resources - drilling of tubewells by contract. Federal Ministry 68.0 (R) State Roads - To support a five-year Consultants would be Negotiations completed. of Works and (IDA) program for state roads upgrading, required in the design Board presentation Housing rehabilitation and maintenance, of road rehabilitation scheduled for June 24, including institutional development and and maintenance 1992. resource mobilization, in all aspects of programs, establishing.a technical and managerial functions. training program for Project environmental reconnaissance was state personnel, and carried out in May/June 1990. other specialized Environmental Assessment Category B. activities to be determined during implementation. Federal Government 101.0 (R) State Water I - Program of physical Consultants for Approved by the Executi of Nigeria, Kaduna (IDA) rehabilitation, expansion, improved engineering design and Directors on May 28, and Katsina State operation and maintenance practices, construction supervision 1992. Water Boards investment planning and financial have been shortlisted. management, and manpower development to Consultants for improve access to public water supply in technical assistance Kaduna and Katsina States. . will also be required.- Environmental Assessment completed. Environmental Assessment Category B. Nigerian National 218.0 Oso Condensate - To develop the Oso Consulting services will Approved by the Execut Petroleum (Bank) Field for export production of be required from time to Directors on April 9, Corporation (NNPC) condensate, through the construction of time by Joint Operating 1991. various site facilities. Project to be Committee (Mobil/NNPC). developed as part of a joint venture (Project contracting f between NNPC and MPN (Mobil Producing goods and services Nigeria). Environmental Assessment routinely offered by completed. Environmental Assessment Joint Operating Commit Category A. (Mobil/MNPC).) - 31 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project s Consulting Services Action on Procurement 4 NIGERIA (Cont'd) Federal Ministry 256.0 (R) Water Rehabilitation - Provision of Contracts for project Approved by the Executiv, of Water Resources (Bank) funds through FMWR to assist states with management consultants Directors on May 21, (FMWR) rehabilitation of existing water supply have been awarded. FMWR 1991. Loan was signed o facilities, provide sector training; is negotiating contracts May 28, 1992. accounting systems; and technical for engineering (Advance contracting at assistance. Environmental Assessment services. 3% of loan amount for Category C. project management consultancy services witl initial financing by Japanese Grant has been included.) IRWANDA Ministry of Health 17.0 (R) Drug Sector Rehabilitation - Project To be determined. Project under (IDA) seeks to: (a) make essential drugs preparation. physically and financially accessible to the majority of the population; (b) increase the efficiency of the drug supply and distribution; and (c) improve the quality of drug prescriptions and use. Environmental Assessment Category C. *Central Bank, 12.0 (R) Private Sector Development - Will Consulting services will Pre-appraisal mission Ministry of (IDA) provide funds to finance: (a) private be required. completed. Appraisal Commerce and investment through eligible financial mission scheduled for Industry (MCI), intermediaries via BNR as APEX June 23, 1992. Ministry of Public institutions; (b) public investment in Works, Banque industrial sites and services through Nationale Rwanda the Ministry of Public Works; and (c) a (BR) multi-faceted technical assistance to MCI and private entrepreneurs. Environmental Assessment Category B. Ministry of 27.0 (R) Agricultural Research II - Follow up Consulting services will Appraisal mission Agriculture, (IDA) effort to support implementation of be required. scheduled for October Institut des national agricultural research program. 1992. Sciences Strengthening of research, extension Agronomiques linkages, and institutional reform. (ISAR) Total project cost is US$30.0 million. Environmental Assessment Category C. Ministry of 30.0 (R) Communal Development - Strengthening Consulting services are Preparation expected to Interior and (IDA) of communal credit fund (CID); training not required at this begin in latter half of Communal of local staff in fiscal and investment stage. 1992. Development programming and project preparation; support for high-priority projects of economic and social infrastructure. Environmental Assessment Category B. Ministry of Public 32.0 (R) Energy Sector - Rehabilitation MV Consulting services will Appraisal report under Works, Energy and (IDA) transmission and distribution networks; be required for preparation. Agriculture and distribution expansion based on policies preparation of terms-of- An IDA PPF advance of ELECTROGAZ (public to improve affordability; and assistance reference for technical US$750,000 was approved utility) to ELECTROGAZ in restructuring and works and for to finance expenses to strengthening of power planning. institution complete preparation of Environmental Assessment Category B. strengthening. project. - 32 - Member Country, Amount & Implementing Probable , Stage of Processing anc Agency ' Lender * Project Consulting Services Action on Procurement RWANDA (Cont'd) Ministries of 40.0 (R) Agricultural Sector Adjustment - To be determined. Appraisal report under Plan, Agriculture, (IDA) Will promote market integration and . preparation. Commerce and diversification of agro-exports. Will Industry also increase efficiency of agro- processing, improve input supply and rationalize the enabling environment for agro-industrial investment and production. Environmental Assessment Category C. Central Bank of 40.0 (R) Financial Sector - Project would Consulting services will Board presentation Rwanda, Ministry (IDA) support a financial sector program and be required. postponed. of Finance other policy reforms in the incentive and regulatory framework to encourage private sector investment and exports. Environmental Assessment Category C. Ministry of 19.1 (R) Food Security and Social Action - . Consulting services will Negotiations completed Planning (IDA) Project is a set of poverty alleviation be required. Approved by the Execut4 programis, including: (a) food security Directors on June 17, and nutrition activities; (b) labor 1992. intensive works; and (c) microenterprise development. Project also includes social surveys and socio-economic surveys. Environmental Assessment Category B. SENEGAL Ministry of 39.0 (R) Public Works and Employment II - The To be determined. Negotiations completed Economics and (IDA) project will finance a second program of Approved by the Execut Finan6e public works to be carried out by the Directors on May 21, private sector using labor-intensive 1992. techniques to create employment. Total project cost is US$81.0 million. Environmental Assessment Category B. Ministry of 20.0 Urban IV - The project will finance To be determined. Project under Finance and Plan (IDA) civil works, goods and consultants to . preparation. execute its three main components: (a) institutional development, including technical assistance, training and equipment; (b) physical investments, including,public infrastructure and facilities; and (c) project management for recurrent costs of project implementation. Total project cost is US$59.0 million. Environmental Assessment Category A. To be determined 70.0 Public Sector Resources Management - Consulting services will Project to be identifi (IDA) Policy Reforms encompassing expenditure be required. restructuring in 'priority sectors' health, water, roads, agriculture); improvements in programming and control procedures; streamlining interagency payment systems; and tackling problems - of overhang of Government arrears to the private sector. Other actions to be identified. Environmental Assessment Category C. - 33 - ember Country, Amount & mplementing Probable Stage of Processing and gency Lender Project Consulting Services. Action on Procurement ENEGA Cont'd) I be determined 20.0 Private Sector Development - Technical Consultants will be Project under (IDA) assistance to private sector for export required. preparation. promotion, linkage between formal and informal sectors, improved management and privatization of support services institutions. Establishment of new financial services for small and medium enterprises. Policy reforms to improve regulatory environment, investment regimes, privatization of public enterprises, and functioning of judicial system. Development of informatics sector. Environmental Assessment Category B. nistere du 15.0 Natural Resources Management - Promotion Consultants will be Project under veloppement (IDA) of policy changes conducive to more required (estimated at preparation. tral, Ministere sustainable land use throughout the 100 staffweeks). (Cofinancing expected la Protection country, and implementation of land use with CCCE and FAC t la Nature, plans with village and herder (France), and with (nistere des associations. Total project cost Norway.) sources Animales estimated at US$30.0 million. Project is specifically designed to have a strong positive environmental impact. Environmental Assessment Category C. ciete Nationale 20.0 (R) Edergy II - Project will comprise: Consultants will be Appraisal mission likely Electricite (IDA) (a) a policy reform component (energy required. to be postponed until ENELEC) pricing, management of charcoal supply, November 1992. Two basic dissemination of improved cooking conditions for appraisal stoves, better management of sector are not yet fulfilled by entities); and (b) an investment the Government of component (time-slice of SENELEC's Senegal: (a) approval of investment program, fuelwood trade a new Code Foreister monitoring system, manufacture of acceptable to the Bank; improved stoves, etc.). Environmental and (b) basic decisions Assessment Category B. in terms of institutional reform of the power sector. aistry of Rural 30.0 (R) Agriculture SECAL - Deepen Consultants will be Policy discussions Yelopment and (IDA) structural adjustment through further required (estimated at ongoing. (ACOS reforms in pricing policy, marketing and 200 staffweeks). An IDA Project input distribution, credit, natural Preparation Facility resources management and tenure, staff advance of US$500,000 was training and career development. Total approved for project project cost estimated at US$100.0 preparation. million. Environmental Assessment (Cofinancing expected Category C. with CCCE for US$18.5 million; USAID for US$20.0 million; EEC for US$25.0 million, and KfW for US$11.5 million.) d 34- Member Country, Amount & Implementing Probable Stage of Processin Agency Lender Project Consulting Services Action on Procuremi SENEGAL (Cont'd) Ministry of Rural 30.0 Water III - A five year tranche of Feasibility studies are Project under Development and (IDA) sector investment plan which will completed. Consultants preparation. Hydraulics improve sector management, strengthen for detailed studies and (Cofinancing will I financial discipline, reduce sector technical assistance required.) dependence on the Government budget, will be required after strengthen sewerage subsector, improve appraisal. rural water supply operation and . maintenance, and limit water shortages in the greater Dakar area. Total project cost estimated at US$298.0 million. Environmental Assessment Category B. Ministry of 50.0 (R) Human Resources Development II - The Preparatory studies have Appraisal mission Education (IDA) project will support policy reforms been completed. scheduled for June designed to promote more efficient Consultant services and 1992. resource use in the education sector; technical assistance improve access to, and the content and will be required after quality of, primary education; project appraisal. restructure vocational training; and enhance the effectiveness, relevance, and quality of higher education. Within this framework, the project will finance functional literacy training; primary school construction,and maintenance, teacher training, provision of textbooks, strengthening of administration and management of primary and secondary schools. Environmental Assessment Category C. SEYCHELLES Ministry of About (R) Infrastructure/Environment - Consultants have been Project under Planning and 10.0 Extension and rehabilitation of water selected for project preparation. External Relations (IBRD) supply; road maintenance; and preparation. (Possible financini implementation of Environment Management - the Global Enviroru Plan. Environmental Assessment Category Facility (GEF) -- B. Annex C.) SIERRA LEONE Ministry of 10.0 (R) Technical Assistance - Assistance to Consulting services will Appraisal mission Finance, (IDA) the Government to improve capacity for be required. scheduled for Development and fiscal management and implementation of May 26, 1992. Economic Planning civil reform. Environmental Assessment Category C. Ministry of Works 50.0 (R) Roads Rehabilitation and Maintenance Consulting services will Appraisal complete4 (IDA) - Rehabilitation of gravel and paved be required for Negotiations tental roads, and strengthening road technical assistance and scheduled for Septi maintenance. Environmental-Assessment supervision of works. 1992. - Category B. National Power 21.0 Power Rehabilitation - Assist NPA with Consultant services will Approved by the Exo Authority (NPA) (IDA) rehabilitation of generation, sub- be required for project Directors on April transmission and distribution facilities management and technical 1992. in the Western area, and help establish assistance. Technical assistani the basis for NPA to become an financed under PPF autonomous and commercially viable utility. Environmental Assessment Category B. I - 35 - Member Country, Amount & Implementing Probable Stage of Processing and Agency 1Lender 2Project Consulting Services Action on Procurement SWAZILAND Ministry of 18.0 (R) Urban I - Improvement of primary Consulting services will Project under Housing and (Bank) infrastructure to urban centers. - be required for project preparation. Pre- Township Rehabilitation of industrial estate preparation and appraisal mission Development infrastructure, provision of serviced implementation. scheduled for October residential plots and upgrading of 1992. settlements. Environmental Assessment (Cofinancing of Category B. US$36.0 million will be required.) TANZANIA To be determined 50.0 (N) Private Sector (Enterprise) To be determined. Project under (IDA) Development - To provide funds for preparation. promotion and development of small-scale enterprises. Environmental Assessment Category B. National Board of 20.0 (R) Financial and Legal Management - To be determined. Negotiations completed. Accountants and (IDA) Project aims to promote accounting, Board presentation Auditors, Legal auditing and legal reforms by scheduled for July 7, Department, IAA, strengthening key public institutions - 1992. IFM responsible for those activities, through training, technical assistance and supply of essential infrastructure and equipment. Environmental Assessment Category C. Ministry of 200.0 (R) Public Sector Adjustment - To Consulting services will Project under Finance (IDA) support overall macro-economic reforms, be required during preparation. Appraisal and to assist in restructuring of the preparation and mission scheduled for parastatals sector, including public implementation. August 1992. enterprise privatization; restructuring (Cofinancing of about and retrenchment of the civil service, US$90.0 million will be budgetary reform, and macro-economic required.) adjustment including exchange rate reform and tax reform. Environmental Assessment Category C. 10ffice of-the 50.0 (R) Urban Infrastructure Consulting services will Identification under way. Prime Minister and (IDA) Rehabilitation - Rehabilitation, be required for First Vice -maintenance, and selected expansion of construction/rehabili- President the infrastructure stock in major urban tation of sites/ areas. Environmental Assessment services, roads, water Category B. and other local government services. rinistry of 40.0 Education Sector Development - The Consulting services will Identification under way. Education and (IDA) project will focus on reform measures to be required. Culture the education sector to include financing of education; teacher formation; management of the system; and curriculum and instructional materials. Environmental Assessment Category: To Be Determined. ,rime Minister's 50.0 (R) Rural Social Services - Consulting services will Identification under way. )ffice (IDA) Strengthening of district level social be required. services including health, nutrition, education and water supply; building up policy formulation and implementation capacity of district governments. Environmental Assessment Category C. -36- Member Country, Amount & Implementing Probable Stage of Processing a Agency Lender Project-' Consulting Services Action on Procurement TANZANIA (Cont'd) Government of 30.0 (R) Telecommunications III - The Consulting services Appraisal mission in Tanzania (IDA) project's objectives are to: (a) required for engineering field. develop TPTC's management and planning and (Cofinancing of about implementation capabilities to achieve implementation, US$90.0 million will its target for system expansion, training, and financial required.) rationalization and quality improvement; management. (b) improve financial performance. The project will support TPTC's institutional Development Program and rehabilitation and expansion plans. Environmental Assessment Category B. TANESCO 100.0 (R) Energy (Power VI) - Additional power Consultant services will Appraisal mission in (IDA) generation scheme and associated be required. field. transmission line, rehabilitation of (Cofinancing will be existing distribution facilities and required.) some diesel units. Institutional reforms and studies. Environmental studies completed and awaiting clearance by Government for release to Bank Executive Directors. Environmental Assessment Category A. TOGO Ministere de 5.2 Education Management - Project will Consulting services will Appraisal mission l'Education (IDA) strengthen the sector's capacity to be required. Experts scheduled for June 1S Nationale et de la implement the Education Ministry's will be needed in the Recherche sector reform strategy. Will focus on: areas of public Scientifique (a) monitoring and analysis, of school management and processes and student learning; administration, (b) programming, budgeting and budget budgetary programming monitoring; and (c) consolidating gains and school-level from an ongoing ministerial research. restructuring. Technical advisers will emphasize skills transfer and in-service training. Environmental Assessment Category C. Ministry of 20.0 (R) Lome Urban Development - Project is Consulting services will Appraisal mission in Equipment and (IDA) designed to: (a) improve sanitary and be required for project field. Posts and social conditions in high density areas; implementation. Telecommunications . (b) improve basic infrastructures to support the functioning of Lome Urban activities; (c) create a financially viable municipal administration; (d) introduce sound practices in management of the urban environment; and - (e) expand the Social Dimension of Adjustment in the capital city. Environmental Assessment Category B. Ministere de 27.0 (R) Education Sector Adjustment - To Consulting services will Pre-appraisal missior 1'Education (IDA) strengthen.sector management, improve be required. scheduled for June 2E Nationale et de la internal efficiency of educational 1992. Recherche system, improve resource allocation and Scientifique revitalize basic education through an emphasis on school level improvement in the quality of teaching and learning. Environmental Assessment Category C. - 37 - ;er Country, Amount & Lementing Probable Stage of Processing and I icy Lender 2 Project Consulting Services Action on Procurement t'd) .stry of 20.0 Economic Management - Will include Consulting services will Revised E.P.S. expected \ning (IDA) support to specific action plans for key be required. August 1992. Pre- ministries, and to the civil service appraisal mission reform. Environmental Assessment tentatively scheduled for Category C. October 1992. Final E.P.S. expected November 1992. Appraisal mission. scheduled for April 1993. stry of Rural 10.5 (R) Agricultural Services Rehabilitation Consulting services may Re-appraisal of project lopment (IDA) - Reorganization of General Agricultural be required during to be done following Support Services including technical project implementation. Government proposed support services, seed production, changes. applied research and cooperative development. Environmental Assessment Category C. DJA ;try of . 15.0 (R) Agricultural Extension - The project To be determined. Appraisal mission :ulture, (IDA) includes: (a) extension services completed. Negotiations L1 Industry through transport, equipment, . scheduled for August/ 'isheries rehabilitation of facilities and September 1992. operating costs; (b) training of staff and farmers and improvement of training facilities and capacity; (c) demonstra- tion of improved techniques; (d) improved management facilities and systems; and (e) studies on efficiency and impact of technology transfer mechanisms and design of a follow up project. Environmental Assessment Category B. try of 22.0 (R) Agricultural Research and Training To be determined. Appraisal mission to ulture, (IDA) (formerly Agricultural Research, . begin June 24, 1992. 1 Industry Training and Management) - The project isheries would: (a) strengthen research through organizational improvements, rehabilitation of main institutes, staff development; (b) finance priority adaptive research and (c) ,strengthen capacity for agricultural education and training. Environmental Assessment Category B. :ry of Water, 40.0 Small Towns Water and Sanitation - Water Consulting services Pre-appraisal mission , Minerals (IDA) supply and sanitation. Environmental required for design and scheduled for July 1992. ivironment Assessment Category B. supervision. .tion AIDS 10.0 (R) Uganda AIDS Control - The project To be determined. Project has been combined sion (IDA) will have three main components: with the Health II (a) institutional strengthening in areas Project. Further of policy and program development reporting will be monitoring and evaluation, equipment and discontinued. motor vehicles, etc.; (b) civil works - office space; and (c) AIDS action evaluation fund for supporting pilot interventions with operations research. Environmental Assessment Category C. - 38 - Member Country, Amount & Implementing Probable Stage of Process2 Agency Lender 2 Project ' Consulting Services Action on Procur4 UGANDA (Cont'd) Office of the 71.2 (R) Northern Reconstruction - Multi- Additional major Approved by the I Prime Minister (IDA) sectoral reconstruction of Northern consulting services are Directors on May Uganda. Environmental Assessment needed for supervision Credit was signe< Category B. of rehabilitation of June 12, 1992. highways and streets. Ministry of Works, 60.0 Transport Sector Rehabilitation - Twinning arrangements or Project preparat: Ministry of Local (IDA) Project would: (a) assist in consulting services will way. Government, and rehabilitation and maintenance of be required for Uganda Railways highways; (b) improve rural feeder road institutional -Corporation accessibility; (c) strengthen marine strengthening of MOWTC, services of Uganda Railways; and MOLG and URC detailed (d)-help restore safety provisions at engineering af roads; Entebbe Airport. Environmental supervision and Assessment Category B. preparing'a road maintenance program. Ministry of 32.0 Economic and Financial Management - Consultants will be Negotiations com Finance (IDA) Strengthening the capacity of the required. March 11, 1992. Ministry of Finance, Ministry of Planning & Economic Development, and Bank of Uganda to formulate and implement economic and financial policies. Environmental Assessment Category C. Ministry of About (R) Financial Sector Adjustment Credit I Consultants will be Appraisal missic Finance (MOF) and 110.0 - To provide support for reform of required. tentatively sche Central Bank (BOU) (IDA) financial sector policies and June 28 to July restructuring of key financial institutions. Environmental Assessment Category C. Ministry of 50.0 (R) Education Sector Reconstruction - To be determined. Appraisal missic Education (MOE) (IDA) Action would support implementation of completed. Awa' education policy commission conditions for recommendations focussing on primary negotiations to schools and related teacher training college, reconstruction and quality improvements and strengthening MOE's * capacity. Environmental Assessment Category C. Ministry of Health 50.0 (R) Health II and AIDS (formerly Health To be determined. Project has bee: (IDA) II) - Follow up of Health I project to with the Uganda further develop rural health services. Control Project The project will also include AIDS, identification northern health and population the field. components. Environmental Assessment Category C. ZAIRE Ministry of About (R) Environment - To develop systems for To be determined. Appraisal delay Environment 20.0 effective protection of parks and country situati (IDA) reserves and to improve management of (Possible finer forests and other natural resources. the Global En'h Environmental Assessment Category A. Facility (GEF) Annex C.) -39- 'r Country, Amount & -menting Probable Stage of Processing and y Lender 2 Project 3 Consulting Services Action on Procurement 'd) try of About Capacity Building - Institutional Consultants will be Post appraisal mission ing 10.0 development project focussed on public required. will be rescheduled (IDA) resource management, economic management depending on country information system, private sector situation. support, and decentralization. Environmental Assessment Category C. try of Public About Urban Environment - Project will Consultants will be Negotiations delayed due and Urban 15.0 include: pilot labor intensive required. to country conditions. opment (IDA) approaches to maintenance of urban infrastructure and environment; urban markets; and land registration and land taxation reform, environmental studies and technical assistance. Project will have positive effect on the urban environment of Kinshasa. Environmental Assessment Category B. I Pipelines, 20.0 (N) Petroleum Rehabilitation -- Project Consulting services will Project has been brought Refinery (IDA) will include the following: be required for pipeline in from the Reserve moil (a) rehabilitation of Tanzania Oil engineering supervision Program. Pre-appraisal Pipeline; (b) energy efficiency measures and supervision of mission completed. at Indeni Refinery; (c) construction of refinery and bulk Appraisal mission bulk petroleum handling facilities; and petroleum handling scheduled for September Id) institutional strengthening of facilities. 1992. petroleum supply companies. Environmental Assessment Category B. ry of 10.0 (R) Privatization and Industrial Reform Consulting services will Board presentation e (IDA) Technical Assistance - Technical be required. scheduled for June 24, assistance to support the reform 1992. program. Environmental Assessment Category C. ry of Health 20.0 (R) Health and Nutrition Consulting services will Identification under way. (IDA) Rehabilitation - Assist with be required. rehabilitation of urban infrastructure and service delivery systems. Environmental Assessment Category: To Be Determined. ty of Energy 25.0 (R) Power Rehabilitation - Policy and Consulting services will Pre-appraisal mission *:er (IDA) investment-based sector operation be required for scheduled for September ment, ZESCO involv'ing policy and institutional institution-building 1992. reforms and selective investments to activities. rehabilitate, upgrade and expand the power system. Environmental Assessment Category B. ies of 14.0 (R) Infrastructure Engineering - To be determined. Project under kcations and (IDA) Technical assistance and studies to: preparation. Appraisal rt, Local (a) prepare a urban road rehabilitation mission scheduled for ent and and maintenance investment project; and September 1992. - , and Works (b) design and implement associated (Cofinancing will be ply policy reforms. Environmental required.) Assessment Category: To Be Determined. - 40 - Member Country, Amount & Implementing Probable Stage of Processi: Agency Lender 2 Project s Consulting Services Action on Procurei ZAMBIA (Cont'd) Ministry of 50.0 (R) Agric-Export Diversification Consulting services will Project under Agriculture (IDA) (formerly Export Diversification) - The be required. preparation. objective is to increase production of agricultural exports in order to diversify the export base from the heavy dependence on the mining sector. Environmental Assessment Category B. Ministry of 32.0 Education Rehabilitation - Project will Consulting services will Appraisal report Education (IDA) provide support for the rehabilita-tion be required for studies preparation. of the sector including: construction and long term (Cofinancing will and rehabilitation of classrooms; assignments. required.) provision of books and learning materials and; the training of education managers. It will also institute mechanisms that will prevent further erosion of the sector. Environmental Assessment Category C. Ministry of 33.0 (R) Marketing and Processing - The Consulting services Board presentatic Agriculture & (IDA) objective is to alleviate policy, completed. scheduled for Jul Water Development institutional and physical constraints 1992. on agricultural marketing and input (Cofinancing of distribution. Environmental Assessment US$12.5 million ' Category B. required.) Ministry of 200.0 (R) Privatization and Industrial Reform Consultant services Board presentatic Finance (IDA) - To support institutional and policy required. scheduled for Jur reforms in trade and public enterprise 1992. restructuring especially the reform of (Cofinancing of z parastatals and the Government's US$10.0 million privatization program. Environmental required.) Assessment Category C. Ministry of 100.0 (R) Multisector Adjustment - To extend Consultant services will Preparation schet Finance (IDA) and deepen the Government's adjustment be sought. begin September program by providing imported goods and (Cofinancing of services, particularly production inputs US$150.0 million for recovery. Environmental Assessment required.) Category C. ZIMBABWE Ministry of 150.0 (R) Emergency Drought Recovery - Will Consulting services will Negotiations com] Finance, Economic (IDA) support imports and technical assistance be required. Board presentatii Planning and for reconstruction of agriculture and scheduled for Ju Development water supply. Environmental Assessment 1992. Category B. (Cofinancing wil required.) Ministry of 50.0 Telecoms - The purpose of the project is Consulting services will Project appraisa Information, Post (IBRD) to develop PTC's management and be required for policy, is planned for J and implementation capacity to achieve finance and engineering. Telecommunications sustainable system expansion and (Cofinancing of improvement in quality and finances to US$150.0 million improve sector policy environment. The required.) process will support institutional development and rehabilitation and expansion plans. Environmental Assessment Category C. -41~- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project 3 Consulting Services Action on Procurement ZIMBABWE (Cont'd) Government of 75.0 (R) Agricultural Services - To improve Consultants have been Appraisal mission in the Zimbabwe (IDA) income and household goods security appointed. field. among households through reforming (Cofinancing of about agricultural marketing, support to US$25.0 million will be research and extension activity, required.) upgrading of livestock support service, and improvement of institutional capacity within the Ministry of Land Agriculture and Rural Resettlement (MLARR). Environmental Assessment Category B. ;overnment/ 20.0 (R) Second Small Scale Enterprise - Will To be determined. Appraisal mission leserve Bank (Bank) provide financial and technical scheduled for July 20, assistance to small-scale micro 1992. enterprises and institution building for (Cofinancing of about participating financial intermediaries. US$5.0 million will be Environmental Assessment Category C. required.) inistry of 30.0 (R) Power Distribution - Reinforcement Consultants will not be Board presentation nergy/ZESA (Bank) and extension of power distribution required. scheduled for July 14, system and public lighting. 1992. Environmental impact is expected to be (Parallel financing for minimal. Environmental Assessment related investments is Category B. being arranged by the Government.) nistry of Local 52.0 Urban Transportation - Improvement of Consulting services will Project awaiting vernment and (Bank) urban transport services through be required. Government response to ral Development 8.0 assistance to bus companies. issues raised during (IDA) Environmental implications are expected appraisal mission. to be minimal. Environmental Assessment (Cofinancing of about Category B. US$38.0 million will be required.) RICA REGIONAL be determined To be (N) Women In Development (WID) - Project Consulting services may Pre-identification deter- will support small enterprises in rural be required for mission in the field. mined and urban areas as well as support for preparation. IEPS to be prepared after (Bank) women's associations and training. . mission. Environmental Assessment Category: To Be Determined. rernments of 25.0 Regional Power - Develop the hydro Consultants have been Project under Legal, (IDA) project in Manatali and the associated selected and econmic preparation. iritania and transmission lines to supply Dakar. feasibility study .i - (OMVS) Environmental Assessment Category A. completed. Other ;anization pour studies to be Mise en Valeur undertaken. Fleuve Senegal - 42 - Member Country, Amount & Implementing Probable Stage of Processing ai Agency Lender 2 Project Consulting Services Action on Procurement II.. EAST ASIA AND PACIFIC REGION CAMBODI Ministry of 75.0 (N) Emergency Rehabilitation - Financing Consulting services will Appraisal mission Finance (IDA) of key imports needed to operate and be required in public scheduled for June 25 maintain essential services, and finance expenditure 1992. technical assistance in procurement and control and monitoring, expenditure control. Environmental and procurement. Assessment Category C. CHINA Ministry of 420.0 Fertilizer Sector Restructuring - Consultants advisory Preparation under way Chemical Industry (Bank) Support to MCI in the implementation of services will be (MCI)/Yunfu its overall fertilizer sector strategy, required. Corporation including the development of a large phosphate plant and rehabilitation of medium/small sized plants as well as associated institution building. Environmental Assessment Category A. East China 257.0 (R) Tianhuangping (THP) Hydro - Consulting services will Pre-appraisal missior Electric Power (Bank) Construction of a 1800 MW pumped-storage include engineering the field. Appraisal United Corporation hydroelectric power plant and services for procurement mission is scheduled transmission network. Will also include of equipment, and October 1992. consultant services, studies and construction management. training. Environmental Assessment Category A. Fujian Provincial 150.0 (R) Fujian Provincial Highway - The main Consultipg services will Project preparation Transport (Bank) project components include: include: mission completed. I Department (FPTD) (a) construction of Quanzhou-Xiamen (a) construction mission is tentativel highway (76 km); (b) improvement of supervision services; scheduled for Octobei provincial road network; and (b) assistance to the 1992. (c) strengthening of provincial road strengthening of the construction industry. Environmental construction industry; Assessment Category A. and (c) staff training. Ministry of Public 300.0 (R) Maternal Child Health - Improvements To be determined. Identification missic Health (Bank)/ in maternal and child health services, tentatively schedulec (IDA) especially in the poorer regions of the Fall 1992. country. Environmental Assessment Category: To Be Determined. State Education 300.0 Vocational Training/Education - The To be determined. Identification missi( Commissiont (Bank)/ project will finance vocational training tentatively schedule< Ministry of Labor IDA activities in selected provinces, late Fall 1992. including facilities, equipment, staffing management and suitable integration with general education. To support development and rationalization of training for employment to absorb future redundant labor from state enterprises. Environmental Assessment Category: To Be Determined. -43- Iber Country, Amount & lementing Probable Stage of Processing and ncy 1 Lender a Project Consulting Services Action on Procurement ntd) ,ghai Municipal 200.0 (R) Second Shanghai Metropolitan Some consulting services Feasibility studies and struction (Bank) Transport (SMTP II) - Project consists for project preparation preliminary engineering mission (SMC) of five key elements: (a) construction/ will be funded under the completed by SMC. upgrading of Inner Ring Road (IRR) technical assistance of Preparation mission forming an extension of the component SMTP I. Further scheduled for July 1992. started under SMTP I; (b) public technical assistance to transport - physical works for the be determined. Shanghai Transit Company; (c) traffic management - extending this component of SMTP I to the whole area within the IRR; and (d) economic reform; and (e) institutional development. Environmental Assessment Category A. stry of 230.0 (R) Housing and Social Security Reform.- Consulting services will Project preparation under Lnce and (Bank) The project is designed to assist the likely be required for way. icipating 170.0 Government in reforming state owned development of the (cipalities (IDA) enterprises. It-aims at delinking the pension, health enterprises from .thair housing and insurance and social security responsibilities to unemployment systems. improve their efficiency, promote labor mobility and enhance social safety for the success of the overall economic reform. Environmental Assessment Category B. stry of 250.0 (R) Electronics - Would support the Consulting services will Preparation under way. ILnery and (Bank) restructuring of the electronics sector be required for project tronics within an agreed framework of national preparation and, 3try/China strategy. Would assist in build-up of implementation. :ronics the following key infrastructure )ration - elements within the electronics industry: (a) industrial standards and quality control mechanisms: (b) technology assimilation and development and (c) basic electronic components and materials. Environmental Assessment Category B. try of 50.0 Reform, Institutional Support and Consulting services will Project preparation under ce (IDA) Preinvestment (CRISP) - Technical be required for way. . assistance for preparation of projects implementation of. expected to be financed by the Bank and subprojects. IDA: strengthening of key institutions; and a program of economic studies and training. Environmental Assessment Category C. Basin 250.0 (R) Taihu Basin - To alleviate severe Consulting services may Pre-appraisal completed rity and (Bank) flood threat in the Taihu Basin of be required to provide April 4, 1992. Appraisal try of Water Eastern China, through: canalization of technical assistance for mission scheduled for eces river outlets to Yangtze River, Hangzhou system monitoring and July 1992. Bay, and East China Sea construction of operation, and water dikes; and installation of pump quality modelling. Retroactive financing of stations. The project would also ensure up to US$20 million a clear water supply for Shanghai. . requested. Environmental Assessment Category A. -44- Member Country, Amount & Implementing Probable Stage of Processing Agency Lender 2 Project 5 Consulting Services Action on Procureme CHINA (Cont-d) To be determined 100.0 (R) Shenyang Industrial Development - Consulting services will Identification miss (Bank) Assistance to the municipal government be required for the field. in the implementation of its overall preparing subsector industrial strategy including subsector development plans. and restructuring plans in a selected number of subsectors together with associated institution building. The financial intermediaries will assess the environmental impact of all subsector projects to ensure that they are consistent with Bank standards. Environmental Assessment Category B. Ministry of 475.0 (R) Sixth Railway - Project seeks to: Individual consultants Pre-appraisal missi Railways (Bank) (a) support railway policy reform required to provide completed. Apprai. initiatives; (b) support railway technical assistance to mission scheduled A investment plans for capacity expansion; prepare project. June 26, 1992. and (c) broaden the scope of system-wide Consulting firms will technological modernization. The likely be required to project comprises: a policy component implement some with three subcomponents (investment components. prioritization, tariff restructuring, and financial accounting procedures revision); an investment component with . six subcomponents (capacity expansion, track maintenance, locomotive and rolling stock maintenance, telecommuni- cations, and transport management information system, pilot container transport) and technology transfer; and a project preparation component component with .three sub-components (railway technology optimization, railway environmental protection, and rail-based container transport). Environmental Assessment Category B. Liaoning 190.0 Songliao Plain Agricultural Consulting services may. Preparation missio Provincial (Bank)/ Development - Project would assist the be required for the field. Planning and (IDA) provincial governments in solving irrigation engineering Economic waterlogging, soil salinity and low crop and agro-processing Commission, Jilin productivity problems in 40 counties in (corn wet-milling Provincial Liaoning and Jilin provinces. It would technologies) during Planning and invest in irrigation and drainage preparation. Economic facilities, plant windbreaks, provide Commission agricultural inputs, rehabilitate fruit orchards, improve livestock and aquaculture production technologies and promote agro-processing and agro- industries, particularly the value-added processing of surplus corn. The project would directly benefit 2.5 million poor farm families. Environmental Assessment Category B. Ministry of 15.0 (R) Ships' Wastes Disposal - Will assist Consulting services will Negotiations comp] Communications, (IDA) the ports of Dalian, Tianjin, Shanghai, be required, and Approved by the E3 Six Port Ningbo, Guangzhou and Xiamen in setting includes about Directors on June Authorities up facilities for the reception and safe US$0.78 million of 1992. disposal of ships' wastes. Will assist technical assistance and (Cofinancing from in development of a plan for dealing studies. Global Environmen with oil spill contingencies. Facility (GEF) -- Environmental Assessment Category B. Annex C.) 7 45- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement 4 CHINA (Cont'd) Henan Province 120.0 (R) Henan Highway - To support highway Consulting services will Negotiations tentatively Communications (Bank) development objectives of the Eighth be required for scheduled for September Department (HPCD) Plan (1991-1995) for the Henan Province constrution supervision 1992. with three key elements: '(a) integrated and for trucking study. development of road system in the Northwestern region of Henan province, centered on the Zhengzhou-Luoyang Corridor; (b) road improvement program throughout Henan; and (c) institutional support and strengthening of highway organizations and highway sector management in the province and a study of trucking. Environmental Assessment Category A. Ministry of 490.0 (R) Grain Distribution - A program of Project preparation is Pre-appraisal mission Commerce (Bank)/ investments in grain distribution, . utilizing consultants in scheduled for late August (IDA) markets, handling, transport, and modern grain handling 1992. transit storage facilities required to technologies, logistics support a changing role of Government of grain distribution, agencies from planned procurement and and computerized sales of grain, to management of information systems for competitive wholesale markets and bulk logistics and market-driven interprovincial grain commodity markets price trade. Environmental Assessment information. Category B. Sichuan Petroleum 250.0 (R) Sichuan Gas Development and Consulting services will Project preparation under Administration (Bank) Conservation - To support Sichuan gas be contracted for way. appraisal, development, aging field technical assistance and (Possible financing from rehabilitation, transmission, training in project the Global Environment distribution, energy conservation and preparation. Facility (GEF) -- see pollution abatement for selected Annex C.) fertilizer plants. Environmental Assessment Category A. Ministry of Water 200.0 (R) Loess Plateau - Agricultural Consulting services Preparation under way. Resources (IDA) productivity would be improved and will be required for environmental degradation reversed in soil conservation, eight tributaries of the Yellow River in grassland management and the Loess Plateau area through: popular participation. (a) construction of terraces, small soil dams and-other erosion control works; (b) establishment of pasture, shrubs and trees on steeply sloped land; and (c) improved management of communal grazing lands. Project would improve productivity and incomes of 1.3 million absolute poor and curtail soil erosion from 15,000 sq. km catchment area. Environmental Assessment Category B. Ministry of 150.0 (R) Second Red Soils Land Rehabilitation To be determined. Preparation under way. Agriculture (IDA) - Disseminate techniques of ecologically FAO/CP mission to sustainable and economically viable land complete preparation rehabilitation and voluntary settlement scheduled for July 1992. over a wide area of degraded red soils across Jiangxi, Fujian, Hunan, Zhejiang and Guangxi--and technical assistance to support research and strengthen extension systems. Environmental Assessment Category B. -46- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement CHINA (Contsd) Ministry of 120.0 (R) Agricultural Support Services - The To be determined. Appraisal mission in the Agriculture (IDA) project would support the production of field. foodgrains, oil crops, cotton and livestock through improvement of support services to farmers--crop, livestock, regulatory and management services, and project management. Services to be emphasized would be applied research, agricultural extension, seed production, veterinary diagnostic services, and quarantine. Environmental Assessment Category C. Sichuan Province 147.0 (R) Sichuan Agricultural Development - Consulting services Board presentation Planning (IDA) To support comprehensive agricultural likely to be required scheduled for July 7, Commission development in Sichuan Province focusing during project 1992. on irrigation, soil conservation, implementation. sericulture, livestock, and agro- Retroactive financing of processing including a strong poverty up to USS14.0 million alleviation component, with particular requested. emphasis on the role of women. A detailed environmental assessment has been completed by the Sichuan Environmental Research Institute for Environmental Protection. Environmental Assessment Category B. People's Bank of 60.0 (R) Financial Sector Technical Consulting services Negotiations anticipated China (PBC)/ (IDA) Assistance - To support PBC's central required for project in July 1992. Ministry of banking functions and strengthen preparation and Finance financial sector development through implementation. possible components for improving bank regulation, supervision and accounting, payments and clearing system, legal framework, research and statistics and domestic debt management. Environmental Assessment Category C. Guangdong Province 240.0 Guangdong Provincial Highway - Would Consulting services will Negotiations tentatively Planning (Bank) focus on highway -- new construction of be required for scheduled for September Commission two major expressways, upgrading and supervision of 1992. rehabilitation of secondary roads; construction of two equipment for highway maintenance, major highways. training program for highway personnel and technical assistance to reform highway financing. Environmental Assessment Category A. Liaoning 150.0 (R) Liaoning Environment - Continuing Consultants required for Preparation mission Environmental (Bank)/ support to improve water management and project preparation. completed. Protection Bureau; (IDA) water pollution control in the Hun/Taizi Liaoning River Basin; consists of physical and Construction institutional development for works for Commission waste water, hazardous waste management for the cities of Shenyang, Fushun and Anshan and cultural heritage conservation. Environmental Assessment Category B. -47 - Member Country, Amount & Implementing Probable Stage of Processing and Agency - - Lender Project ' Consulting Services Action on Procurement CHINA (Cont'd) Shanghai Port 150.0 (R) Shanghai Part II - Rehabilitation To.be determined. Appraisal mission Authority/ (Bank) and expansion of port and cargo handling currently in the field. Ministry of facilities at Shanghai. Environmental Coninunications Assessment Category A. State Education 100.0 (R) Effective Teaching Services Consultants are likely Pre-appraisal mission in Commission (IDA) (formerly Effective Teachers Services) - to be required for the field. Support reform of teacher education for technical assistance in lower middle school teachers and for teacher education and primary school teachers in under- instructional methods. privileged areas, including curriculum reform, development and dissemination of innovative teaching methods, improved efficiency and control through modern - management and information systems, and upgrading of facilities and equipment. Environmental Assessment Category C. Planning and 150.0 (R) Southern Jiangsu Environment - To Consultants have been Appraisal mission in the Economic - -' (Bank) support investments in urban and selected. Two studies field. Commission of industrial projects that demonstrate are being financed under Jiangsu Province significant environmental payoffs and to the Japanese T.A.-Grant strengthen institutional, regulatory and Facility. environmental management capabilities of the provincial agencies. Environmental Assessment Category B. Ministry of Public 125.0 (R) Rural Health Manpower Development Consulting services may Pre-appraisal mission in Health (IDA) (Health IV) - Assistance in training and be required during the field. re-training rural health manpower-in the project implementation. . - poorest counties of five provinces. Environmental Assessment Category C. Ministry of 350.0 Fertilizer and General Process Equipment Consultants will be Preparation under way. Machinery and (Bank) Manufacturing - Restructuring of the required for project Electronics fertilizer and general process equipment preparation and related Industry manufacturing industry and selected sector study for which enterprises to enable them to upgrade the terms of reference their products and improve their have been finalized. efficiency. Environmental Assessment- Financing arrangements Category A. are being made..- Invitations for proposals are expected to be issued after decision on financing arrangements. Changchun 120.0 (R) Changchun Environment and Water Consultants have Appraisal mission Municipal Planning (IDA) Supply - To provide water supply to finalized feasibility completed. Negotiations Commission relieve serious shortages, and to plan studies. scheduled for October for appropriate disposal of waste water. 1992. Environmental Assessment Category B. - 48 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project ' Consulting Services Action on Procurement 4 CHINA (Cont-d) Yellow River 400.0 (R) Xiaolangdi Multipurpose - To .. Consulting services for Environmental panel and Conservancy (Bank)/ construct major dam (Xiaolangdi) on construction supervision other consultants are Commission (IDA) Yellow River to provide protection for will be required. revisiting the project t 100 million people from catastrophic review the EIA and pre- floods on North China Plain, alleviate qualification documents siltation and aggradation of river for contractors. The channel, provide irrigation water to Government has not yet over one million ha of farmland, provide resolved the financing municipal and industrial water aspects of the project. throughout the region, and generate This issue could delay electric power. There is a resettlement the issuance of pre- component involving about 190,000 people qualification documents to be resettled over a 20 year period. Detailed plans have been prepared, and a pilot resettlement site is being prepared for construction in 1992. Potential environmental impact has been reviewed and EIA report being finalized.. Environmental Assessment Category A. II Tianjin 100.0 (R) Tianjin Industrial Development II - Consultants are Appraisal mission in th 1 Municipality and (Bank) Assistance to the municipal government preparing sub-sector field. China Investment in the implementation of its overall development plans. Bank industrial strategy including subsector and restructuring plans in a selected number of industries together with associated institution building. The financial intermediaries will assess the environmental impact of all subsector projects to ensure that they are consistent with Bank standards. Environmental Assessment Category B. Shanghai Municipal 250.0 Shanghai Industrial Enterprise Reform - Consultants required to Preparation under way. Government (Bank) Assistance to the municipal government help prepare sub-sector in the implementation of its overall development plans. industrial strategy including development and restructuring plans in a selected number of subsectors.together with associated institution building. The financial intermediaries will assess the environmental impact of all subsector projects to ensure that they are consistent with Bank standards. Environmental Assessment Category B. Zhejiang Province 220.0 (R) Zhejiang Provincial Highway - Consultants will be Approved by the Execut Communications - .(Bank) Provincial transport, including recruited for Directors on May 19, Department Hangzhou-Ningbo Highway. Environmental construction 1992. Loan was signed Assessment Category A. supervision. June 19, 1992. Ministry of 310.0 Zouxian Thermal Power - Construction of Consultants are already Approved by the Execut Energy/ (Bank) two generating units of 600 MW each and in place. Directors on April 21, Shandong associated transmission lines and 1992. Provincial substations, and technical assistance Electric Power including a study of air quality impact Procurement: Advance Bureau of thermal power plants in China's procurement required f coastal region. Environmental impact boilers and auxiliarie statement has been reviewed by the Bank. turbine auxiliaries, a: The analysis indicated that the project other electrical and will meet World Bank's guidelines and mechanical equipment f all applicable Chinese environmental two 600-MW coal-fired norms. Environmental Assessment generating units. Category A. -49- mber Country, Amount & plementing Probable: Stage of Processing and ency Lender Project 3 Consulting Services Action on Procurement [IRA ont' d) nistry of Energy 120.0 Shuikou Hydro Power II - Second phase Consultants-are already Negotiations tentatively (Bank) construction of dam and powerhouse. in plact. scheduled for July 9, Program to enhance resettlement and 1992. environmental management are currentlj: being executed under the exi-tetiilfoan. Environmental As-=-.iEnt Category A. anjin Municipal 100.0 (R) Tianjin Urban Development and Consultants have Negotiations completed. vernment (IDA) Environment - To improve municipal assisted preparation of Approved by the Executive planning, environmental sanitation, and detailed design and bid Directors on June 17, transport. Environmental Assessment documents. 1992. Category B. snghai Municipal 150.0 (R) Shanghai Environment - Continuing Consultants required for Identification mission ;ernment (Bank)/ program to improve water supply sewerage project preparation. completed. (IDA) and environmental pollution control in the city of Shanghai. Environmental Assessment Category B. ite 82.7 (R) Regional Cement - To establish a new Consultants have Approved by the Executive iinistration for (Bank) high grade cement plant based on provided technical Directors on March 17, Ilding Materials regional cooperation in the Shanghai assistance for 1992. (ustry Economic Region; rehabilitate an engineering design. existing cement plant and provide Procurement: Key tender technical assistance for design and packages have been research capabilities of local cement- issued, and some of the related institutes. Plant design bids received are being changes have been agreed to enhance de- evaluated by the State dusting capacities to meet stricter Administration for environmental standards. Agreement has Building Materials been obtained that asbestos cement will Industry/International not be used for plant construction. Tendering Company Environmental Assessment Category A. (SABMI/ITC). an Development 150.0 (R) Zhejiang Multi-Cities - Provision of Consultant services will Appraisal mission ject Office of (IDA) urban services, in particular water be required for completed. Negotiations jiang Province supply, liquid and solid waste technical assistance tentatively scheduled for management, land development scheme in during project September 1992. Shaoxing city, improve public transport implementation. and traffic management in Hangzhou, Retroactive financing of improve institutional strength and up to US$8.8 million financial performance in urban services. would be provided. Environmental Assessment Category B. gsu Province 100.0 (R) Jiangsu Chemical Sector - Support Consultants have been Negotiations are (Bank) development of provincial chemical hired to assist in tentatively scheduled for industry, including associated technology August/September 1992. institution building. All subprojects identification. will be subject to government of China's Consultants are being environmental impact assessment process recruited.for various which is satisfactory. Project will technical assistance also establish a center to oversee activities. hazardous and toxic waste management in Jiangsu. Environmental Assessment Category B. 50 - Member Country, Amount & Implementing Probable Stage of Processin Agency Lender 2 Project Consulting Services Action on Procuremi FIJI Ministry of 10.0 Education - To further develop general To be determined. Identification unde Education (Bank) education, especially pre-school and secondary education, including secondary teacher training and to introduce - - - relevant and cost-effective technical/vocational training programs. Total project cost is US$50.0 million. Environmental Assessment Category: To Be Determined. Ministry of 15.0 (R) Second Road Upgrading (formerly Consulting services will Negotiations comple Infrastructure and (Bank) Roads) - Upgrading of several high be required for Approved by the Exe Public Utilities priority sections of the road networks technical assistance in Directors on June 3 improving road management, particularly road management, 1992. road maintenance; and institutional detailed engineering for strengthening. Environmental Assessment selected road sections, Procurement: Advar Category B. construction -c procurement requirc supervision and for institutional institutional strengthening. strengthening. Retroactive financl up to US$1.5 millic requested. INDONESIA Bina Marga 135.0 (N) Kabupaten Roads (East Indonesia) - Consulting services will IEPS was issued on (Ministry of (Bank) To develop the Kabupaten (or third level be required for 5, 1992. Public Works) road network in seven Eastern Indonesian supervision, design and provinces. About 3,000 kms of roads training. would be rehabilitated. -Improved maintenance techniques and staff training are also included. Environmental Assessment Category B. To be determined 70.0 (R) Book and Reading Development - To To be determined. Project identifical (Bank) strengthen both the demand for and under way. supply of educational books through improved book publishing, printing and distribution as well as library support and active reading promotion. Environmental Assessment Category C. To be determined 120.0 (R) Higher Education III - To improve To be determined. Project identifical (Bank) the higher education system. under way. Environmental Assessment Category: To Be Determined. To be determined 100.0 Professional Human Resource Development To be determined. Project identifical (Bank) II - To develop human resources under way. management.- Environmental Assessment Category: To Be Determined. To be determined 100.0 Secondary Education III - To assist in To be determined. Project identifical (Bank) secondary education management and under way. quality control. Environmental Assessment Category: To Be Determined. - 51 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project Consulting Services Action on Procurement INDONESIA (Cont'd) To-be determined 15.0 (R) GEF-Biodiversity Conservation - The Consulting services will Project preparation under (Bank) project would aim to: (a) develop a be required for project way. model for an Integrated Conservation preparation. Selection (Possible financing from Development Project (ICDP) including under way. the Global Environment (i) an institutional framework to manage Facility (GEF) --.see the Kerinci-Seblat National Park, Annex C.) (ii) establishing mechanisms for local community participation in conservation and development activities, and (ii) support for provincial governments and NGOs; and (b) support several other institutions also of high priority under the Indonesian Biodiversity Action Plan, including ex-situ conservation, policy studies and conservation awareness creation and education. Environmental Assessment Category A. BAPPENAS/Ministry 75.0 Integrated Pest Management - Supports To be determined. Pre-appraisal mission of Agriculture (Bank) and promotes safe, effective and scheduled for September environmentally sound pest management 1992. practices through the expanded adoption of a more balanced and diversified approach to crop production. Project will train extension workers and farmers in crop management and crop protection practices, support farmer-based research and monitoring and regulatory programs. Total estimated project cost is US$60.0 million. Environmental Assessment Category B. inistry of 70.0 Forestry III - Strengthening of To be determined. Project preparation under Forestry (Bank) institutions in the forestry sector way. through human resources development, research and extension activities. May also include further support of improved management of concessions and forest plantations. Environmental Assessment Category B. (erusahaan Umum 80.0 (R) Cirata Hydroelectric (Phase II) - To be determined.. Appraisal mission Iistrik Negara (Bank) Project would complete the development scheduled for June 25, (PLN) of the Cirata Hydroelect:ic project by 1992. the addition of four generating units of 125 MW each and civil works consisting of two power tunnels and four tailrace tunnels. Environmental Assessment Category B. ?o be determined 200.0 (R) Gas Utilization II - To promote non- To be determined. Identification mission in (Bank) tradeable supplies of natural gas for the field. industrial and commercial use to meet demand in Java. Environmental Assessment Category: To Be Determined. be determined 280.0 (R) Rural Electrification II - Support To be determined. Identification under way. (Bank) for the Government's rural electrification program and for further development of Government's role in encouraging private participation in rural electrification. Environmental Assessment Category B. -52- Member Country, Amount & Implementing Probable Stage of Processing a Agency Lender 2 Project Consulting Services Action on Procurement INDONESIA (Cont'd) To be determined 100.0 Industrial Technology Development - To To be determined. Identification under (Bank) support policies, infrastructure and human resource development and to promote financing for technology transfer and development of technological innovation in the industrial sector. Environmental Assessment Category: To Be Determined.. Ministry of Public 50.0 Kalimantan Urban Development - Five-year Consultants undertaking Project preparation I Works, Directorate (Bank) urban infrastructure expenditure project preparation under way. for Programme programs for participating local including environmental Development governments. These will include analysis, institutional municipalities of Samarinda, Balikpapan, strengthening, and Banjarmasin, Palangkaraya and Pontianak training. which account for about 80% of the Kalimantan urban population, and up to one Kabupaten from each of the provinces. Environmental Assessment Category B. Ministry of Public 90.0 Semarang/Surakarta Urban Development - Consultants have been Project preparation Works, Director (Bank) Improvement of the functioning of the selected to assist with progress. General for Human two major cities in Central Java preparation for pre- Settlements Province through an integrated program appraisal and appraisal, of priority infrastructure investments and detailed supported by revenue improvement and environmental institutional development action plans. assessments. Later, Environmental Assessment Category A. consultants will be required for implementation support, detailed design and supervision. To be determined 75.0 Secondary Teacher Development - To To be determined. Project identificati (Bank) improve the quality of secondary under way. teachers through in-service and pre- service training. Environmental Assessment Category: To Be Determined. Directorate 75.0 (R) Integrated Swamps - Strengthen Consultants have Pre-appraisal comple General Water (Bank) institutional framework for swamps prepared project. Appraisal mission Resources reclamation and support integrated scheduled for Januar Development development of viable existing reclaimed 1993. (DGWRD) swamps; rehabilitate infrastructure, improve agriculture, and support . environmental protection. Environmental, assessment is yet to be finalized. Assessment expected in November 1992. Environmental Assessment Category A. Ministry of Health 70.0 Water and Sanitation for Low Income Consultants and NGOs Project preparation (DG of (Bank) Community - To meet basic needs of low under recruitment for way. Communicable income communities in rural and urban project preparation. Disease), Ministry areas, and improve health status and of Public Works productivity through provision of safe, (DG Cipta Karya), adequate and easily accessible water Ministry of Home supply and proper sanitation. Affairs (DG Environmental Assessment Category B. Bangda/Bangdes) - 53 - er Country, Amount & ementing Probable Stage of Processing and ay- Lender 2 Project Consulting Services Action on Procurement 0ISIA td) try of Public 350.0 Highway Sector II - To improve the Consulting services will Project preparation under \/Ministry of (Bank) quality of interurban national/ be required for project way. nications provincial roads through selective implementation. capacity improvements and maintenance. Also, to improve formulation and implementation of road infrastructure and road transport policies. Environmental Assessment Category A. ahaan Umum 150.0 (R) Outer Islands Power - To support To be determined. Project identification ik Negara (Bank) expansion of generation and transmission under way. facilities in outer islands, including South Sumatra and South Kalimantan. Project scope not yet defined. Environmental Assessment Category A. ahaan Umum 375.0 (R) Telecommunications IV - To provide Consultants will be Approved by the Executive omunikasi (Bank) additional telephone services in Java, required for project Directors on June 2, "TEL,) Bali, East Nusa Tenggra and Sulawesi; implementation, human 1992. and and improve service and modernize resource development, ommunications telecommunications facilities. financial management EL) Environmental Assessment Category B. strengthening and future project preparation. :ry of Public 180.0 Surabaya Urban Development - To help Consultants for project Pre-appraisal mission (Bank) institutional strengthening and priority preparation will be completed February 1992. urban infrastructure investments in extended with funds from Appraisal mission , Surabaya. Environmental Assessment E. Java Bali Project. scheduled for September Category A. 1992. .ry of Public 190.0 (R) Kabupaten Roads III - Maintenance Consulting services will Negotiations completed. Ministry of (Bank) and rehabilitation of local roads in be required for project Approved by the Executive ffairs about 65 districts. Institutional and coordination, Directors on June 17, human resources development through institutional 1992. training and improvement of development, field planning/budgeting and implementation implementation and Retroactive financing for arrangements, particularly for road training. consultancy services and maintenance. Environmental Assessment civil works up to Category B. US$12.0 million will be required. orate 54.0 (R) Groundwater Development - Project Consultant services will Appraisal mission 1 of Water (Bank) will include: (a) construction of about be required to assist in scheduled for September/ ces, 2,000 groundwater irrigation systems project implementation. October 1992. ry of Public serving about 25,000 ha in poverty prone Ministry of areas; (b) initial operations and Ilture, maintenance prior to full private sector cial management; (c) agricultural development as including crop diversification, extension, provision of limited inputs, crop demonstrations; (d) community support including domestic water supply, irrigation of house gardens and activities related to the role of women; (e) technical assistance; and (f) institutional support. Environmental Assessment Category B. - 54 - Member Country, Amount & Implementing Probable Stage of Process Agency' Lender - Project . Consulting Services Action on Procui INDONESIA (Cont,d) To be determined 75.0 Health IV - The project would support To be.determined. Project identifl (Bank) health sector expenditure investment under way. programs in selected provinces. Environmental Assessment Category: To Be Determined. Ministries of 100.0 (R) Watershed Management and To be determined. Pre-appraisal ml Forestry, (Bank) `Conservation - Strengthen sustainable the field. Agriculture and natural resource management in critical Home Affairs watersheds. Institutional development at national and regional levels and specific conservation activities in Cimanuk Watershed in West Java. -Would reduce land and resource degradation and improve social conditions. Environmental Assessment Category B. To be determined 50.0 (R) Skills Development (formerly To be determined. Project preparal (Bank) Industrial Skills Development) - To way. support development of effective training delivery systems in three selected provinces. Environmental Assessment Category C. Public Port 90.0 Ports Upgrading - The project would: Consultants have been Project identif Corporation II (Bank) (a) provide for expansion requirements recruited by Perumpel II under way. (Perumpel II); . in secondary ports to meet rapidly for pre-investment Ministry of increasing traffic; and (b) improve studies for two ports. Communications installations and practices for Consultants will be (MOC) environmentally safe maritime transport requirpd for other in general. Environmental Assessment components. Category: To Be Determined.- Directorate 36.6 Primary School Teacher Development - To Consulting services will Board presentat General of Higher (Bank) support the Government's plan to upgrade be required for project scheduled for J Education qualifications of primary teachers implementation. 1992. through in-service and pre-service programs to improve the quality and expanded capacity of basic general education systems. Environmental Assessment Category C. Perusahaan Umum 400.0 .(R) Suralaya Thermal Power - To support Consultants selected for Negotiations co Listrik Negara (Bank) expansion of Suralaya Thermal Power project implementation. Board presentat Pusat (PLN) project by the addition of 3 x 400 MW Consulting services will scheduled for J units, to meet expected growth in demand be required,for 1992. for electric power in Java. technical assistance Environmental Impact Assessment report components. Advance Procure was received and the summary was Action involvin circulated to the Board. Environmental invitation will Assessment Category A. - initiated. - 55 - Country, Amount & enting Probable Stage of Processing and Lender Project Consulting Services Action on Procurement 4 d) nmental 80.0 (R) Industrial Efficiency and Pollution Consulting services will Pre-appraisal mission Management (Bank) Abatement - To provide a package of be required for project scheduled for July 13, credit and services to existing preparation and 1992. industrial enterprises to enable them to implementation. comply with environmental standards. The project would also develop or strengthen the capability of Ministry of Industry staff, local authorities and consultants in environmental analysis and monitoring. The project targets the abatement of industrial pollution. Environmental category will be reviewed after March 1992 preparation mission which will reformulate project design. Environmental Assessment Category A. Iy of 200.0 (R) Financial Sector Development - Consultant services Negotiations in progress. ./Bank (Bank) Support of GOI legislation and policy required for bank "ia reforms to strengthen the Indonesian supervision and credit financial system by strengthening information systems. prudential control and supervision, and recapitalization of state commercial banks. Environmental Assessment Category B. rate 87.6 (R) Tree Crop Smallholder Development - Consultant services will Approved by the Executive of Estates (Bank) To support Government's efforts to be required for project Directors on April 30, increase smallholder coconut and rubber implementation. 1992. Loan was signed on production. A revised environmental June 5, 1992. impact assessment has been approved by GOI addressing all issues retarding land use, agricultural practices, and use of agro-chemicals. A related management plan has also been approved. Environmental Assessment Category B. r of Health 75.0 (R) Community Health and Nutrition III - Consulting services will Appraisal mission in the (Bank) The project would: (a) reduce infant be required for project field. and maternal mortality in selected areas preparation and focussing on the poor; (b) improve. implementation. health information system; and (c) health education capability. Environmental Assessment Category C. and Seoul 80.0 (R) Kwangju and Seoul Sewerage (formerly Consultants have been Appraisal mission rernments (Bank) Seoul Sewerage) - Construction of selected. scheduled for November sewerage treatment plants with 1992. capacities of 300,000 m'/d and one million ml/day, technical assistance for water conservation experiment. Environmental Assessment Category B. - 56 - Member Country, Amount & Implementing Probable Stage of Process Agency ' Lender 2 Project Consulting Services Action on Procur KOREA (Cont'd) Government of 100.0 (R) Financial Sector Investment - The To be determined. Appraisal missioa Korea (Bank) project will: (a) support the scheduled for Se: Government's program for deregulating 1992. the financial system and strengthening the banking system; (b) provide long- term credit through eligible banks to sound private enterprises; and (c) support institutional building P programs of participating banks and strengthening technical capabilities of regulators. Environmental Assessment Category C. DAE RAN Oil 90.0 (R) Petroleum Distribution & Sector To be determined. Pre-appraisal sc Pipeline Corp. (Bank) Improvement (formerly National Oil for July 8, 1992 Pipeline) - Consisting of construction presentation is of a nationwide oil pipeline network, tentatively sche with a total length of about 1,000 FY93. kilometers in various diameters, for transporting petroleum products. Retroactive fine Project makes significant contribution up to US$10.0 mi in reducing road hazards and air being considerec pollution and oil spillage incidents. partial payment Total project cost is about delivery equipme US$900.0 million. Environmental Assessment Category A. Ministry of 90.0 Science Education and Research - Will Consulting services will Identification z Education/Korea (Bank) finance equipment to support quality not be required. completed. Pre- Basic Science improvement in science and engineering mission scheduli Center (KBSC) programs in selected universities, in July 1992. the Open University, and in vocational and junior colleges. Will also improve the research capacity of KBSC. Environmental Assessment Category C. Ministry of 60.0 (R) Environmental Management Education & Consulting services will Identificationi Education (Bank) Research (formerly Natural Resource not be required. completed. Pre Management & Research) - Will finance mission schedul equipment to improve programs in July 1992. agriculture, research management, and conservation and environmental protection in selected agricultural and veterinary science colleges. Environmental Assessment Category C. Ministry of 50.0 (R) Science Education and Libraries Consulting services will Approved by the Education (Bank) Computerization - Will finance equipment not be required. Directors on Ma to support quality improvement in 1992. Loan was secondary and undergraduate science June 19, 1992. education and to assist development of libraries' computer network. Environmental Assessment Category C. Ministry of 30.0 (R) Vocational Schools Development - Contracts will be Approved by the Education (Bank) Will finance equipment to improve awarded to local Directors on Ms quality of vocational education. consultants in the 1992. Loan was Locally-financed studies aimed at amount of June 19, 1992. institutional strengthening. US$0.2 million. Environmental Assessment Category C. -57- ,ember Country, Amount & Implementing Probable Stage of Processing and kgency ' Lender " Project Consulting Services Action on Procurement EOREA (Cont,d) i,inistry of Health 30.0 (R) Public Hospital Modernization - To Consulting services Negotiations completed. Social Affairs (Bank) support: (a) improvements in the will not be required. Board presentation capacity of public hospitals to meet scheduled for August 4, increased demands for medical care, 1992. especially by the urban and rural poor; (b) strengthening of public health institute: and (c) studies of health care financing. Environmental Assessment Category C. orean National 90.0 (R) Railway Systems Modernization - Consulting services will Negotiations completed., lailroad (Bank) Includes: (a) implementation of a be needed to develop and B6ard presentation computerized 01S/MIS; (b) development of implement railroad scheduled for August 25, series of operational action plans; computer management 1992. (c) acquisition of electric cars; and information systems and (d) technical assistance training. to prepare an action Retroactive financing of Implementation over a four year period plan to introduce public up to 10% may be from 1992-1995. Environmental service contracts in the requested for OIS 'Assessment Category B. railroad. packages and electric rail cars. asan and Tacjon 40.0 (R) Pusan and Taejon Sewerage - Consultants have been Approved by the Executive Lty Goverments (Bank) Construction of two sewage-treatment appointed. Directors on March 26, plants with capacities of 340,000ms/d 1992. Loan was signed on and 150,000'/d, and of about 20 kin of May 21, 1992. interceptors with large diameters. Environmental Assessment Category B. ,oul Metropolitan 80.0 Solid Waste Management - To assist SMG Local consultants have Appraisal report under )vernment (SMG) (Bank) in reducing collection costs through been engaged for the preparation. implementation of solid waste transfer first two transfer facilities, and providing environmental- stations. Retroactive financing of ly safe disposal through implementation up to US$8.0 million has of sanitary landfill facilities. Bank been requested by the has received Government clearance for . Government to cover cost the environmental assessment. Environ- of trailers and tractors mental assessment has been distributed for the first transfer to the Executive Directors, station. Environmental Assessment Category A. 10. PEOPLE-S MOCRATIC PUBLIC ovincial 10.0 Luang Namtha Provincial Development - To Consultants have been Project preparation under vernment of (IDA) initiate a pilot provincial development selected for project way. ang Namtha scheme by addressing some of the urgent preparation. Consulting (Japan Grant Facility for development needs in the project's services will be project preparation province, and to provide affirmative required for project signed in January 1992.) action for WID issues by supporting implementation. income generating activities. Environmental Assessment Category: To Be Determined. be determined 30.0 (R) Telephone Systems Expansion - To be determined. Project preparation under (IDA) Extension of telephone network into way. Pre-appraisal outlying provinces through provision of mission scheduled for digital exchanges, cable plant and October/November 1992. microwave connections, provision of international links, institutional strengthening of Enterprise des Postes et Telecommunications Lao (EPTL); and training of staff. Environmental Assessment Category B. - 58 - Member Country, Amount & Implementing Probable Stage of Processing ar Agency ' - Lender Project Consulting Services Action on Procurement LAO, PEOPLE* S DEMOCRATIC REPUBLIC (Cont'd) Bank of Lao, PDR 15.0 Industrial Credit II - A line of credit Consulting services will Initial identificatior (IDA) through the Bank of Lao and selected be required for: mission completed in commercial banks for modernization and (a) technical assistance November 1991. Appral expansion of private industrial for financial sector mission scheduled for enterprises and related service reform; (b) training for November 1992. enterprises; and support with technical term lending; and assistance for strengthening financial (d) technical assistance sector reform and support services for to strengthen support industry. Environmental Assessment infrastructure for Category: To Be Determined. industry. Electricite.du 34.0. (R) Provincial Grid Integration - .To be determined. Negotiations tentativ Laos (EDL) (IDA) Project will include: (a) extension of scheduled for mid-sum rural electricity networks in southern 1992. and central provinces; (b) feasibility study for a 40 MW expansion of the Nam Ngun hydroelectric plant and (c) institutional development component for EDL. Environmental Assessment Category B. Department of 10.0 (R) Northern Rural Development and To be determined. Project preparation t Forestry and (IDA) Watershed Management - To extend the way. Environment, . approach and methodology of the Upland Ministry of Agriculture Project to Luang Prabang, Agriculture and Oudomsay and Phonsaly northern Forestry provinces, especially emphasizing environmental issues and poverty alleviation. Environmental Assessment Category: To Be Determined. Ministry of 11.5 (R) National Forestry Management and Consultants have been Appraisal report undo Agriculture & (IDA) Conservation - To support selected to finalize preparation. Forestry recommendations of Tropical Forestry preparation. Additional (Japan T.A. Grant Action Plan, including development of services will be Facility support has improved legislative and institutional required.for obtained to complete framework for the forestry sector; implementation. project preparation. completion of forest resource inventory financing is being work; strengthening of forestry explored with the Gl management; and implementation of forest Environment Facility resource management conservation FINNIDA.) programs. Environmental Assessment Category B. Ministry of 20.0 (R) Education Sector Development - To Consultants will be Appraisal report und Education and (IDA) respond to immediate needs for quality required for preparation. Sports and efficiency improvements in basic implementation. (Japan Grant Facilit education through: implementation of support for project new curricula and instructional preparation in final materials: rehabilitation of school stages of commitment infrastructure developing technical Mission to be held skills in planning, monitoring and jointly with Swiss evaluation; and strengthening of Development Corporat administrative and managerial capacities in July 1992 to conl at central and local levels. cofinancing. Need J Environmental Assessment Category C. PPF/retroactive fins is to be discussed. - 59 - 'er Country, Amount & Lementing Probable Stage of Processing and icy Lender Project Consulting Services Action on Procurement . PEOPLE-S OCRATIC ThBLIC 'it'd) tstry of Health 10.0 First Health - To reduce the high Consulting services Project preparation under Social Welfare (IDA) incidence of preventable communicable required for preparing way. diseases in three priority provinces and and implementing the. (Cofinancing to be sought increase the efficiency of health. project. for implementation. services delivery through strengthening Japan Grant Facility for selected provincial and district systems project preparation was and infrastructure. It would also adapt signed on February 3, training curricula to health needs and 1992.) strengthen the government's capability to formulate, analyze and implement health policies. Environmental Assessment Categorv C. YSIA Stry of 106.0 Polytechnic Development - Establish Consulting services Negotiations tentatively ition (Bank) three new polytechnic institutes with required for preparing scheduled for August 12,000 new full-time training stations -and implementing the 1992. and 3,000 part-time training stations; project. train 1,000 new teachers and administrators; implement major policy reforms to convert national deliver system to be more "demand-driven" and operationally efficient. Would also adapt and introduce a broader range of technical curricula. Environmental -Assessment Category C. ak Public 50.0 Sarawak Roads - Rehabilitation and Consulting services for Project preparation under Department (Bank) upgrading of 160 km of main trunk road supervision and way. system, procurement of weighbridges. technical assistance (Japan T.A. Grant Total estimated cost US$100.0 million. will be required. Facility support of yen Environmental Assessment Category A. 64.0 million has been awarded for environmental studies and partial contribution towards detailed desigA studies.) try of 30.0 Non-formal Education and Training (NFET) Consultants will be Project preparation under aal and Rural (Bank) - To build up a national institutional required for supervising way. npment capability for developing NFET, and to the project., (Japan T.A. Grant support selected NFET programs. Facility support of yen Environmental Assessment Category C. 50.62 million was awarded for WID.) a Nasional 200.0 (R) Power System Development - Will Consulting services for Negotiations completed. 1 (TNB) (Bank) finance the following components from Paka will be appointed Approved by the Executive the Tenaga Nasional Berhad's (TNB's) and financed by Tenaga Directors on February 25, investments: (a) 1 x 300 MW gas-fuelled Nasional. - 1992. Tenaga National combined-cycle power block at the -, Bank has delayed loan existing 900 MW Paka power station; - . signing. (b) 230 km long, 275 kV Kampung Awah- Yong Peng transmission line; (c) 275- Retroactive financing of 132 kV system expansion for power supply USS10.0 million will be in Kuala Lumpur. Environmental allowed. Assessment Category A. - 60 - Member Country, Amount & Implementing Probable Stage of Processing Agency Lender Project ' Consulting Services Action on Procureme MALAYSIA (Cont'd) Federal Land 94.0 (R) Third FELCRA Land Development - Time Consulting services will Approved by the Exe Consolidation and (Bank) slice financing of most of FELCRA's be required during Directors on June 9 Rehabilitatioh program including the rehabilitation of implementation for 1992. Authority (FELCRA) low yielding small farms with tree crops financial management in schemes under group farming study. Retroactive financi arrangements, the construction of scheme US$9.5 million has access roads, and infrastructure, approved. promotion of improved agricultural technology, institutional strengthening and small farmer entrepreneurship. Environmental Assessment Category B. Ministry of Health 63.5 (R) Health Development - To improve the Consultants appointed Negotiations tentat and Chemistry (Bank) capacity to monitor environmental health for project preparation scheduled for Octob Department of and infectious diseases, enhance equity and implementation, and 1992. Science, in access to health development through financed by Japan T.A. (Japan T.A.'Grant Technology and primary health care, support health Grant Facility. Facility has been Environment development through use of appropriate approved for projec health technology, and to strengthen preparation.) Ministry of Health-s institutional capacity through management and personnel training, health technology assessment and quality assurance, occupational health and other policy development. Environmental Assessment Category C. Ministry of 30.0 Drainage and Flood Mitigation - Time Consulting'services will Project preparation Agriculture, (Bank) slice of national drainage program, be required for project way. through Department covering 5-8 schemes throughout preparation. (Japan T.A Grant Fa of Irrigation and Malaysia, and including infrastructural has committed funds Drainage investments and related agricultural preparation assista development, as well as institutional strengthening of the drainage and irrigation department. Environmental Assessment Category A. Ministry of 162.0 (R) Primary and Secondary Education Twinning arrangements Negotiations schedu Education (Bank) III - Improve quality of education, covering training and for July 1992. expand access and increase managerial consulting services will efficiency. Reinforce and complement be entered into with ongoing sector projects through: universities and/or (a) strengthening of teacher training; specialized (b) establishment of an effective institutions. educational technology network and provision of instructional resources; (c) support to innovation and research; (d) construction of schools, teacher housing and boarding facilities; (e) a staff development program and institution building; (f) strengthening of school-based evaluation; (g) teaching and managerial staff development program; and (h) a management information system. Environmental Assessment Category C. - 61 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project Consulting Services Action on Procurement MONGOLIA Ministry of 30.0 Structural Adjustment .(SAC),- Provide To be determined. Initial document under Finance (IDA) balance of payments support for the , preparation. transition to a market-based economy. Environmental Assessment Category: To Be Determined. PAPUA NEW GUINEA To be determined 20.0 Telecom IV - To strengthen the Post and To be determined. Identification under way. (Bank) Telecommunications Corporation's (PTC) ability to manage the sector efficiency, and to support the Government's investment program to telecommunications development. Environmental Assessment Category: To Be Determined. Department of 10.0 (R) Forestry - To support institutional To be determined. Preparation delayed Forestry (Bank) restructuring of the forestry sector and pending implementation of other components of the national forest Japanese Grant Facility plan. Environmental Assessment Category (JGF) field project. A. Department of 11.5 (R) Petroleum Development Technical Consulting services will Negotiations scheduled Mines and Energy, (Bank) Assistance - Technical and economic be required for for June 29, 1992. Government of studies for evaluation of downstream technical and economic Papua New Guinea projects. Review of procedures for studies, review of evaluation of applications for petroleum procedures, and development licenses, and strengthening institution building. of institutions involved with petroleum exploration and development. Environmental Assessment Category B. Department of 8.0 Population - Assists Government's To be determined. Appraisal report under Finance and (Bank) population policy through: preparation. Planning (a) strengthening family planning service delivery; (b) promoting demand for family planning; (c) strengthening institutional capacity to develop population policy and direct/manage family planning activities; and (d) improving demographic information base. Environmental Assessment Category C. National 35.0 Education Development Project - Consulting services will Appraisal report under Department of (Bank) Construction and equipping of one likely be required for preparation. Education national high school, school project management. maintenance, regional planning and teacher support services. Environmental Assessment Category C. - 62 Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Poject Consulting Services Action on Procurement 4 PAPUA NEW GUINEA (Cont'd) Department of 36.8 (R) Oro Smallholder Oil Palm Development Consulting services will Approved by the Executiv Agriculture and (Bank) - To develop about 6,500 ha of land in be required for field Directors on June 9, Livestock Oro Province into smallholder oil palm inspection. 1992. farms. The appraisal mission and government of Papua New Guinea discussed three main environmental issues: factory effluent treatment which should be upgraded choice of project area outside of primary forests; and protection of an endangered butterfly. - In addition sound agro-chemical usage and soil protection procedures are to be provided for. Environmental Assessment Category B. PHILIPPINES Department of 45.0 (N) Women's Health and Safe Motherhood - To be determined. Preparation under way. Health (IDA) To improve the reproductive health of. women through: (a) expansion and strengthening of women's health and safe motherhood services (including family planning); (b) strengthening core departmental units to manage these services, and promoting collaboration between Government, NGOs and local governmental units to improve services; and (c) testing new ways to deliver women's health services and measure impact. Environmental Assessment Category C. National Power 250.0 (R) Leyte-Luzon Geothermal Power - Consultants are Project preparation und Corporation and - (Bank)- Project will meet increasing power completing final way. Appraisal departu Philippine demand in Luzon at lowest cost by engineering. scheduled for June 1993 National Oil utilizing geothermal resources in Leyte. (Cofinanciers' meeting Company Project would include: (a) development completed May 29, 1992 of Leyte Geothermal; (b) construction of Washington, D.C.) about 440 MW power generating capacity; and (c) Leyte-Luzon transmission line. Environmental assessment under preparation. Environmental Assessment Category A. Central Bank 150.0 Export Development - Project will To be determined. Revision of project (Bank) support measures to accelerate documents under way. development of exports including export Revision would reflect finance/guarantee, infrastructural, and changes in the economic institutional support. Environmental environment such as Assessment Category C. increased availability foreign currency documented loans and foreign exchange retention by exporters. - 63 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project Consulting Services Action on Procurement PHILIPPINES (Cont'd) National Power 200.0 (R) Leyte Cebu Geothermal Power - To Consultants are Appraisal departure Corporation and (Bank) meet increasing power demand in Cebu at completing final scheduled for Philippine lowest cost by utilizing geothermal engineering. September 1992. National Oil Co. resources in Leyte. Project will A major reform program, include: (a) development of Leyte including institutional, Geothermal; (b) construction of about corporate and financial 200 MW power generating capacity; and measures, is under way. (c) the Leyte-Cebu transmission line. (A US$30.0 million grant Environmental assessment being from the Global completed. Environmental Assessment Environment Facility Category A. (GEF) is being considere jointly with Leyte-Luzon Geothermal.) Metro Manila 80.0 (R) Metro Manila Solid Waste Local consultants have Appraisal departure Authority (NMA) (Bank) Management - Would include: been engaged. scheduled for November (a) development of two sanitary 1992. landfills; (b) construction of four transfer stations; (c) procurement of transfer trucks and equipment for landfill operations; (d) rehabilitation of maintenance workshops; and (e) technical assistance for operations and management of solid waste operations and related studies. Environmental Assessment Category A. Local Water 40.0 (R) Second Water Supply, Sewerage and Consultants have been Project preparation is Utilities (Bank) Sanitation Sector - To assist the selected for feasibility under way. Administration Government in meeting basic needs of studies and designs. (LWUA) urban population through provision of Consultants for the safe, adequate, easily accessible water formulation of sectoral, supplies through implementation of institutional and extensions of systems in some 50 towns. financial reforms, Institutionally, the project would seek including privatization, to accomplish major sectoral and will-be required. institutional reforms to improve the capabilities and sustainability'of urban water supply operations and maintenance, development, financing and cost recovery. The feasibility of privatization would be considered. Environmental Assessment Category B. Department of 35.0 (R) Tax Computerization - Would improve All technical assistance Pre-appraisal mission in Finance (Bank) administration of all taxes in the has been intiated. the field. Substantial Philippines by establishing an Bidding specifications procedural and integrated, computerized tax system. will be completed end institutional Environmental Assessment Category C. 1992. improvements are being implemented by Bureau of Customs (BOC) and Bureau of Internal Revenue (BIR with the IMF, ADB and Bank support. Department of 70.0 (R) Urban Health and Nutrition - To To be determined. Appraisal mission Health (Bank) assist the Government to expand and scheduled for November improve public health and nutrition 1992. services for high-risk urban slum dwellers, especially women and children, in Metro Manila, Cebu and Cagayan de Oro. Environmental Assessment Category 2. -64- Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender Project Consulting Services Action on Procurement 4 PHILIPPINES (Cont-d) National 75.0 (R) Irrigation Operations Support II - To be determined. Appraisal mission Irrigation (Bank) Second Phase of nine-year operations and scheduled for August Administration maintenance support program, with' 1992. (NIA) special emphasis on development of irrigator associations to assume direct responsibility for operations and management of parts-of all major national systems. Environmental Assessment Category B. Department of 80.0 Rural Infrastructure - To reduce poverty Consultants have Project preparation unde Public Works and (Bank) and accelerate development in the,rural completed preparation. way. Highways (DPWH) areas through: (a) provision of basic infrastructure (rural roads, minor drainages, etc.) through improved targeting of DPWH investments in line with the geographical distribution of poverty; and (b) employment generation. in construction through increased civil works. Environmental Assessment Category B. Department of 25.0 Land Reform Support - To provide Consultants have been Project preparation undg Agrarian Reform (Bank) managerial, technical and financial selected for way. (DAR) assistance to smallholder beneficiaries preparation. (Japan T.A. Grant, of agrarian reform; as well as to Facility has committed smallholder outgrowers in the vicinity funds for preparation of estates to be transferred. assistance.) Environmental Assessment Category B. National 90.0 (R) Rural Electrification - A consultancy for a Approved by the Executi, Electrification (Bank) Revitalization project to finance the rural electrification Directors on February 2 Administration uncovered portion of the Sector's master plan has begun 1992. Loan was signed 4 (NEA) investment program for 1992-94. The using USAID financing. June 3, 1992. loan would include components for The same consultancy financing institutional development for will address accounting NEA and the Rural Electric Coops (REC). weaknesses in some 40 Environmental Assessment Category C. RECs. Other consultancies to be determined. Department of 30.0 Technology Development - The project Twinning arrangements Project preparation Science and ' (Bank) would stimulate more rapid technology required for project nearly completed. Pre- Technology development in industry through building implementation. appraisal mission links between key technology completed. institutions and industry, and through creation and restructuring of key institutions in the technology infrastructure. No adverse environmental effects. Environmental Assessment Category C. -65- aber Country, Amount & plementing Probable Stage of Processing and ency Lender I Project ' Consulting Services Action on Procurement ILIPPINES 'nt'd) Lonal Manpower .36.0 (R) Second Vocational Training - Consultant services for Negotiations completed. I Youth Council (IDA) (a) Strengthening the policy, planning, management and technical. Approved by the Executive C) management, research and evaluation training will be Directors on June 18, capacity of the National Manpower.and. required. Local and 1992. Youth Council; (b) improving training foreign fellowships will standard and cost recovery; also be required. / (c) rehabilitating existing facilities; and (d) undertaking sector studies. Better trained technicians are expected to assist with environmental control systems and the project would also attempt to increase access to technical training for women. Environmental Assessment Category C. lippine Long 134.0 (R) Telephone System Expansion,- Provide Consulting requirements Negotiations completed. tance Telephone (Bank) longidistance telecommunications are expected to be Board presentation pany (PLDT) equipment, telephone exchanges and minimal. Prequalifica- scheduled for early FY93. cables for about 100,000 new telephone tion application for lines in PLDT's system throughout the outside plant supply to Philippines. Environmental Assessment be called shortly. Category B. 0MON ISLANDS istry of 5.0 Third Education - To assist with: To be determined. Preparation under way. cation and (IDA) (a) consolidation of primary schools; an Resources (b) primary teacher in-service training; IRDlfl) (c) upgrading the quality of existing secondary schools; (d) the supply of educational materials; (e) management and planning training; and (f) in the health sector training of nurses.and health workers. Environmental Assessment Category C. Ltry of 2.8 (R) Housing - To formulate housing and To be determined. UNDP-financed project sing and (IDA) urbanization policies, strengthen sector preparation study began Brnment institutions and provide affordable early April 1992. iices housing to low-income families. Preparation mission Environmental analysis is included as scheduled for late July part of project preparation study. 1992. Environmental Assessment Category B. (Cofinancing of US$2.5 million has been secured from EDF.) ELAND opolitan 108.0 (R) Distribution System Improvement & To be determined. Appraisal mission }tricity (Bank) Expansion - Project involves expansion completed. Appraisal Lority (MEA) of MEA's distribution system from 1992 report under preparation. to 1993, including construction of Yellow cover staff transmission and distribution lines and meeting scheduled for substations. Environmental Assessment. June 30, 1992. Category B. - 66 - Member Country, Amount & Implementing Probable Stage of Processinj Agency Lender Project ' Consulting Services Action on Procuremi THAILAND (Cont,d) Petroleum 105.0 Gas Transmission -To utilize natural Consultant services will Negotiations comple Authority of (Bank) gas reserves in the Gulf of Thailand to be required for April 30, 1992. Bc Thailand (PTT) meet the increasing energy demand in the implementation. presentation schedt central and southern regions. for July 1992. Environmental assessment report completed. Draft is beinz reviewed. Procurement: Lettc Environmental Assessment Category A. intent for procuren linepipe issued. Advance Procurement Advance contracting been awarded. Retroactive financi up to US$10.0 milli being considered fc partial payment of lineope. Ministry of 40.0 Industrial Pollution Control - To treat *Contract with Danish Internation. Industry (Bank) industrial waste water, particularly consultants signed March Development Agency hazardous waste water and heavy metals 1992. (DANIDA) expected 1 which are most serious environmental finance institutiox risks for the country and the Gulf of studies for institi Thailand. Government has approved new pollution control. environmental law. Environmental Assessment Category A. Royal Forestry 20.0 (R) Forestry and Land Reform (formerly Consulting services will Project preparatio Department (RFD), (Bank) Land Reform and Forest Protection) - be required to complete way. Agricultural Land Project consists of two major preparation, and (Japan T.A. Grant Reform Office components: (a) to provide social, subsequently for Facility has commit (ALRO) infrastructural and production support implementation. funds for preparatJ to occupants of degraded public forest assistance. Cofin lands alienated for agriculture; and also being sought J (b) the demarcation and protection of Global Environment priority conservation forests, wildlife Facility -- see Ant sanctuaries and national parks. Environmental Assessment B. Provincial 40.0 (R) Distribution System Upgrading - To Consultants are in Approved by the Ext Electricity (Bank) upgrade PEA's transmission system. place. Directors on Authority (PEA) Environmental Assessment Category B. September 24, 1991. was signed on September 27, 1991. TI II - 67 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement VANUATU Department of 4.0 Petroleum Exploration Promotion and Consulting services will Project preparation under Geology and Mines, (IDA) Geothermal Development Technical be required for seismic way. Government of Assistance - Seismic surveys and surveys, geochemical Vanuatu geochemical studies to determine the studies, economic and hydrocarbon potential of offshore financial studies for sedimentary basins; economic and geothermal development, financial evaluation of geothermal drafting of legislation, resource developments and promotion of regulations and model hydrocarbon exploration and agreements, project strengthening of involved institutions. management, and Environmental Assessment Category B. hydrocarbon exploration promotion. WESTERN SAMOA 'To be determined 5.0 (R) Education - To improve and To be determined. Project identification (IDA) strengthen the education system and under way. management planning. Environmental Assessment Category: To Be Determined. - 68 - Member Country, Amount & Implementing Probable Stage of Processing a Agency Lender 'Project 3 Consulting Services Action on Procuremeni III. EUROPE AND CENTRAL ASIA REGION ALBANIA' Ministry of 10.0 (R) First Transport - The project would To be determined. Project preparation u Transport (IDA) include: (a) a pilot road way. rehabilitation program; (b) improvement. of port operations; (c) a port of duties (equipping the port workshop to permit regular efficient repair and operation of cargo equipment) and provision of navigation equipment to guarantee safe access to the port). Environmental Assessment Category: To Be Determined. To be determined 7.5 (R) Employment and Social Protection - Consulting services will Project preparation u (IDA) Project would provide assistance in be required. way. Preparation mis social security, employment and in the field. training, and education. Environmental Assessment Category C. Ministries of 20.0 (R) Critical Imports - Project will Consulting services for Appraisal report unde Finance, (IDA) finance the priority import requirements project management will preparation. Board Agriculture, of key economic sectors. Environmental be required. presentation schedule Transport and Assessment Category B. for June 25, 1992. Directorate for Power (DPE) BULGARIA Ministry of 100.0 (N) Water and Sanitation (WASL) - Consulting services will First preparation mis Regional (Bank) Project will assist the Government of be required and scheduled for Septeml Development, Bulgaria in restructuring/strengthening recruited by the Bank. 1992. Housing Policy and water and sewerage operating companies Construction and to finance a three-year time slice of the priority water and sewerage investment program. Environmental Assessment Category B. Ministry of 215.0 Debt and Debt Service Reduction (DDSR) - To be determined. Project under Finance (Bank) Project will reduce the external debt preparation. service obligations of the Government to a level compatible with growth and the restoration of creditworthiness over the medium-term. Environmental Assessment Category C. To be determined 150.0 Sector Adjustment II/Private Sector To be determined. Preparation under way (Bank) Development (SAL II/PSD) - Project will: (a) strengthen the framework for private sector development; and (b) support creation of new private sector activities and privatization of state enterprises. Environmental Assessment Category C. -69- I.r Country, Amount& ~menting . Probable Stage of Processing and zyLender Project Consulting Services Action on Procuremen td) determined About Human Resources I - To develop To be determined. Preparation under way. 100.0 educational assessment capability, Pre-appraisal mission, (Bank) -upgrade educational resources, and scheduled for July 1992. support restructuring of higher education and research. Also, employment promotion. Environmental Assessment Categorv C. determined 100.0 (R) Energy I - Likely to support To be determined. Project identification (Bank) improvements in the energy sector mission completed. *including improvements in district Appraisal mission heating, automated electricity dispatch . scheduled for end June equipment assistance to the main coal 1992. mines, and completion of a hydro- project. Environmental Assessment Category B. determined About (R) Industrial Restructuring Development To be determined. Pre-appraisal mission 100.0 (formerly Industrial Development) - To completed. (Bank) support creation and growth of private (Cofinancing may be enterprises, privatization and required.) restructuring of state firms, and export development. Environmental Assessment Cateaory B. determined 150.0 *Financial and Enterprise Sector To be determined. First- preparation mission (Bank) Adjustment - To support the planned for July 1992. modernization and strengthening of the (Cofinancing proposed.) Bulgarian banking system, and the restructuring and privatization of state-owned enterprises and private enterprise development.. Environmental Assessment Category C. determined About Agricultural Development - To assist in To be determined. Appraisal mission 50.0 increasing and stabilizing agricul-tural, . - tentatively scheduled for (Bank) production for domestic supply and September 1992. export of primary and agro-processed production through increased mechanization. Environental Assessment Caeory B. SLOVAKIA Power About (R) Second Power and Environmental Consulting services-will Project preparation under rise 150.0 Improvement - Project will provide for: be required for auditing way. Appraisal mission (Bank) (a) priority Investment/upgrading in and corporate tentatively scheduled for Slovakia, Industry and Redevelopment of restructuring of SEP, November 1992. Vojanv Power Station; (b) pollution the borrower. control for De-nox waste disposal; - (c) transmission system upgrading; (d) system control center upgrading; and (e) training consultancy. Environmental Assessment Cate&ory A. determined 125.0 Agroindustry - Scope of operation likely To be determined'. Project'identification (Bank) to include investments and technical postponed. assistance for restructuring of agroindustrial enterprises. Environmental Assessment Category: To Be Determined. - 70 - Member Country, Amount & Implementing Probable -Stage of Process Agency Lender 2 Project Consulting Services Action on Procu: CZECHOSLOVARIA (Cont'd) SPA Prague and SPA About (R) Telecommunications - Supports Consulting services will. Appraisal report Bratislava 190.0 expansion and strengthening of national be required for completed. Negc (Bank) trunk and international networks to improving the accounting not yet schedule improve congested telecommunications and financial management (Cofinancing frc services and provide service to function of the two and EIB expected businesses. Includes institutional borrowers (SPA Prague strengthening of telecommunications and SPA Bratislava). enterprises. Environmental Assessment Category C. Czech Power About (R) Power and Environmental To be determined. Approved by the Enterprise 246.0 Improvement - Supports rehabilitation of Directors on Ma3 (Bank) existing facilities, including 1992. environmental component to improve air quality, and technical assistance for Retroactive finz institutional development, up to US$0.750 n Environmental Assessment Category B. for expenditures after July 1, 15 been requested. To be determined About (R) Environment - Scope of this To be determined. Project preparat 150.0 operation likely to include support for way. (Bank) institutional development, technical - (Possible financ assistance for strategic and pre- the Global Envii investment studies, and investments in Facility (GEF) areas of municipal services, hazardous Annex C.) waste disposal facilities, and reclamation of mined lands. Environmental Assessment Category A. ESTONIA Ministry of About (R) Rehabilitation - Will finance To be determined. Post appraisal n Finance 25.0 essential imports through a foreign the field. (Bank) exchange market component and a pre- identified imports component. '.1 Environmental Assessment Category N/A. HUNGARY Ministry of About (R) Health and Social Services (formerly Consulting services will Appraisal missic Welfare 70.0 Health) - Would assist the Government in not be required. tentatively schE (Bank) restructuring the health sector and June/July 1992. strengthening the institutional capacity of the Ministry of Welfare and National Social Insurance Administration through reforms in public health promotion, primary health care delivery, rationalization-of hospital care and health care management and financing. Environmental Assessment Category: To Be Determined. To be determined 100.0 Product Market Development - Would To be determined. Negotiations (Bank) provide financing for enterprises to substantially cc restructure their wholesaling and Board presentati retailing operations and define a planned for Sept medium-term strategy for the development 1992. of the trading industry.- Environmental Assessment Category B. - 71 - Country, Amount & enting Probable Stage of Processing and Lender 2 Project Consulting Services Action on Procurement' d) al Bank of 200.0 (R) Enterprise Reform - Support for Consulting services Approved by the Executive (Bank) efficient restructuring on the public will not be required. Directors on April 7, enterprise sector, including enterprise 1992. Loan was signed on governance reform and a realistic April 27, 1992. privatization program. Environmental Assessment Category C. Retroactive financing of up to US$40.0 million for expenditures incurred after December 15, 1991 has been approved. y of 75.0 (R) Roads - Will include road Limited consulting Appraisal report under rt (Bank) strengthening, bridge rehabilitation, services required to preparation. and a road safety program. improve existing Environmental Assessment Category B. environmental procedures, pavement management systems, and design standards. etermined About (R) Second Financial System Consulting services Appraisal mission in the 100.0 Modernization - Will follow up on first will be required.for field. (Bank) project, including support for: project preparation and (a) commercial banks in areas of processing. institutional and information technology systems development and strengthening of portfolios; and (b) institutional strengthening of the tax administration department. Environmental Assessment Category C. ,illamos 150.0 Energy Environment - To support Consulting services Preparation under way. iszvenyt (Bank) development and implementation of will be required for Appraisal tentatively appropriate environmental policies in project preparation scheduled for the power sector, and finance power implementation. September 1992. generation, selective expansion of capacity, dispatching and distribution, upgrading emission control equipment and some district heat upgrading. Environmental Assessment Category A. of 40.0 (R) Rehabilitation - Project will To be determined. Post appraisal mission in (Bank) finance a variety of essential imports the field. 'and possible technical assistance. Environmental Assessment Category N/A. A of 55.0 (R) Rehabilitation - Project would fund To be determined. Post appraisal mission (Bank) essential imports to help minimize scheduled for June/July further economic decline during critical 1992. Progress depends early period of economic reform. on timing of IMF Stand-by Environmental Assessment Category N/A. Arrangement. -72- Member Country, Amount & Implementing Probable Stage of Processi Agency Lender Project Consulting Services Action on Procur POLAND Polish Power Grid 150.0 (N) Power Sector Restructuring - The To be determined. Project under (PPG) (Bank) project will include: (a) a Private preparation. Sector Investment Fund (PSIF) (would be managed by PPG and would, taking into account financing from other multilaterals, finance up to 30% of the cost of private investments through JVs and IPPs in the power sector; and (b) a loan to PPG for urgently needed investments in the high-voltage transmission system. Environmental Assessment Category B. Polish 175.0 (R) Telecoms II - The project would To be determined. Project preparat Telecommunications (Bank) tentatively consist of a timeslice of way. Company (TPSA) the development program of the Polish Post, Telephone, and Telegraph. The focus would be on'digital exchanges, transmission equipment, optimization of cable and line equipment, microwave transmission equipment, testing and maintenance equipment, and rural subscriber radio systems. Environmental Assessment Category C. Ministry of 150.0 (R) Forestry Development - To implement To be determined. Project preparat Environmental (Bank) a program of environmentally sound way. Appraisal Protection, forest management through the scheduled for Ju Natural Resources restoration of damaged forest areas and Forestry afforestation, intensification of silvicultural treatments, and privatization of sector activities. Environmental Assessment Category B. Ministry of 175.0 (R) Roads (formerly Second Transport) - To be determined. Appraisal schedu Transport and (Bank) Project would suppport and speed up the June 1992. Maritime Economy modernization and transformation of the (Cofinancing may sector with special emphasis on the required.) national road network and the administration responsible for it, GDDP. Project would specificially: (a) improve the road network; (b) continue support for the development of modern management tools in GDDP; (c) introduce competitive bidding for road works; (d) improve road safety; (e) support increase of road user charges to better correspond to economic costs; and (f) initiate development of modern combined transport systems. Environmental Assessment Category B. Ministry of Health 130.0 Health Services Development - To support Consulting services will Approved by the and Social Welfare (Bank) the Government's program for health be required. Directors on Ma) system reform and restructuring, through health promotion, development of primary A PPF of US$1.5 health care, health policy and has been approve management and creation of regional Bank and Govern health services. Environmental (parallel cofin Assessment Category C. except for from EC-PHARE). Regional Health Services which is Category B. - 73 - Member Country, Amount & Implementing Probable Stage of Processing and igency ' Lender Project 3 Consulting Services Action on Procurement 4 POLAND I(Cont'd) inistry of 300.0 (R) Agricultural Sector Adjustment - To To be determined. President's report being kgriculture and (Bank) support Government reforms in the finalized. Board (ood Economy agricultural sector. Environmental presentation pending IMF Assessment Category C. agreement. (Financing of technical assistance by EC-PHARE being finalized.) be determined 150.0 (R) Cogeneration - Privatization of Consulting services will Appraisal mission (Bank) combined heat and power plant. be required under one completed. Appraisal Environmental Assessment Category B. turn-key contract. report under preparation. o be determined About (R) Industrial Environment - Support for To be determined. Project preparation under 150.0 privatization and restructuring of major way. (Bank) industrial polluters. Environmental Assessment Category B. lish Development 60.0 (R) Private Enterprise Development - Consulting services will Approved by the Executive nk (Bank) Line of credit for efficient investments be required. Directors on May 7, 1992. for start-up and expansion of private sector enterprises, and technical assistance for institutional development. Total project cost is about US$187.2 million, of which US$125.1 million in foreign exchange. Environmental Assessment Category B. nistry of About (R) Financial Sector Adjustment - To be determined. Appraisal-mission nance 300.0 Further support for the government's tentatively scheduled for (Bank) economic transformation program end June 1992. focussing on restructuring of the (Cofinancing with EBRD financial sector. Environmental possible.) Assessment Category C. aistry of About (R) Housing I - To support development Consultants for Negotiations completed. astruction and 200.0 of a market-based housing system through assisting in project Board presentation itial Economy (Bank) the creation of housing finance implementation scheduled for June 25, services, and an increased role for the preparation from 1992. private sector in housing construction. Japanese Grant Facility, (Cofinancing from EBRD, Environmental Assessment Category C. USAID, UNDP, and others. USAID and others expected.) (ANIA be determined 150.0 (N) Agroprocessing and Marketing Consulting services will Project objectives and (Bank) Export - The project would finance be required design being discussed. agroprocessing and marketing joint (100 staffweeks in food Will be defined shortly ventures with the European Community processing technology, and incorporated in the (EC) countries in view of plans for domestic and export IEPS (February 1992). Romania to become an EC associated marketing). country. Environmental Assessment Category B. istry of Labor 100.0 (N) Employment and Social Protection - To be determined. Preparation mission in Social (Bank) The project would support development of the field. tection employment, training, and social assistance services to ease transition to a market economy. Environmental Assessment Category C. - 74 - Member Country, Amount & Implementing Probable Stage of Processing an Agency Lender Project - Consulting Services Action on Procurement ROMANIA (Cont'd) ROMTELECOM 75.0 (N) First Telecommunications - The To be determined. Project preparation (Bank) project would provide for: mission scheduled for (a) rehabilitation and expansion of June 1992. exchanges, external cables and long distance networks in urban and rural areas; (b) sparesparts and equipment; and (c) institutional development. Environmental Assessment Category D. To be determined 125.0 (N) Petroleum Sector Restructuring - The Consulting services will Appraisal mission (Bank) objectives of the project are to provide be required. tentatively scheduled assistance to the Government in the October 1992. restructuring of sector entities with a (Cofinancing will be view to: (a) promoting private sector requested.) investments in the petroleum subsector; (b) enhancing the domestic production of oil and gas; upgrading the efficiency and capability of the oil and gas transmission and distribution networks; (c) addressing the environmental pollution of soil and groundwater in oil and gas producing areas; and (d) assisting in establishing an effective energy pricing policy. Environmental Assessment Category B. To be determined 110.0 (N) Municipal Development/Environment - To be determined. Identification missic (Bank) The project will include: (a) funding planned for late Fall for construction of new and/or 1992. completion of existing municipal infrastructure and facilities; (b) technical assistance to local governments; and (c) technical assistance to central government institutions responsible for implementation of local government reform. Environmental Assessment Category B. Ministry of 115.0 (R) Transportation - Civil works, To be determined. Pre-appraisal missio: Transport (Bank) materials, equipment, technical scheduled for July 1 assistance and training for road rehabilitation and maintenance. Project could include minor components for other transport modes. Environmental Assessment Category B. Ministry of About (R) Education - To support reform Consulting services will Pre-appraisal missic Education 125.0 implementation in: (a) educational be required. the field. (Bank) assessment/testing; (b) primary and secondary curriculum and teaching,. quality; (c) educational materials; and (d) education management and financing. Environmental Assessment Category C. - 75 ,er Country, Amount tementing Probable Stage of Processing and yic Lender Project Consulting Services Action on Procurement LNIA Lt'd) 200.0 (R) Power and Coal Subsectors Consulting services will Pre-appraisal mission in (Bank) Rehabilitation and Modernization - The be required and will be the field. objectives of the project are to provide identified during (Cofinancing will be assistance to RENEL (the power utility) project preparation. requested.) for: rehabilitation of thermal power plants, reinforcement and expansion of power transmission system, modernization of load dispatching system, and upgrading institutional capabilities. Environmental Assessment Category A. l determined 250.0 Financial and Enterprise Sector To be determined. Preparation under way. (Bank) Adjustment - The project would introduce systematic reforms in the banking sector, strengthen public debt management and monetary control, create an effective capital ownership function, and ensure efficient design and implementation of enterprise privatization and exit mechanism. Environmental Assessment Category C. try of Labor 100.0 (R) Employment and Social Protection - To be determined.. Preparation mission in ocial (Bank) Development of employment, training and the field.' ction social assistance services to ease transition to a market economy. Environmental Assessment Category C. try of 175.0 (R) Industrial Development - Redesigned To be determined. Project preparation under my and (Bank) to become development finance operation, way. Appraisal mission 'ce, Ministry including pre-shipment export finance . tentatively scheduled for sources and facility and permanent working capital end June 1992. try, National and investment finance. Policy elements (Cofinancing may be y for include support to privatization, required.) cization and private sector development, industrial and Mid-Size sector restructuring strategy and ?rises, enterprise restructuring programs. ipating Technical assistance for both policy and financing parts. Environmental Assessment Category B. Iry of 100.0 (R) Private Farmer and Enterprise Agricultural Economist, Approved by the Executive y and (Bank) Support - Medium and long term credit to Marketing Specialist Directors on June 11, e . private farmers and to viable rural, cohsultants, and 1992. Loan was signed on small and medium enterprises. Also, Agricultural Credit June 12, 1992. parallel institutional support and Specialist from Japanese (Support financing from technical assistance. Environmental Trust Funds. EC-PHARE for parallel Assessment Category B. activities being arranged.) 'ry of -400.0 (R) SAL - Support policy reform for Consulting services Approved by the Executive e (Bank) development of a market economy, will not be required. Directors on June 2, deregulation, reduction in the role of 1992. Loan was signed on the state and development of the private June 2, 1992. sector. Environmental Assessment Category C. - 76 - Member Country, Amount & Implementing Probable Stage of Processing Agency Lender Project s Consulting Services Action on Procuremi TURKEY To be determined 240.0 (N) Energy Conservation - The project To be determined. Project preparatior (Bank) would provide for: (a) equipment mission scheduled A materials and,services for improving the August 1992. efficiency with which energy is produced and consumed; and (b) institutional development. Environmental Assessment Category D. Ministry of Public 250.0 (R) Earthquake Rehabilitation and Consulting services will Post appraisal mis Works and (Bank) Reconstruction - The project will assist likely be required. under way. Negotti Settlements the Government in the rehabilitation and tentatively schedu reconstruction of urban centers damaged June 22, 1992. by the earthquake, and improve (Cofinancing from construction standards and planning Development Fund-- through regulatory instruments at the of Europe, and pos municipal and national levels to protect Japan.) urban infrastructure and superstructure from future earthquake tremors. Environmental Assessment Category B. ISKI 150.0 (R) Istanbul Water Supply and Sewerage Feasibility study for Second preparation (Bank) III - Water supply, sewerage and part of the project mission tentativel drainage system. Environmental expected to be financed scheduled for Dece Assessment Category B. by Nordik Investment 1992. Bank; Master Plan to be (Cofinancing will updated. required.) Treasury 9.2 (R) Technical Assistance Treasury Data Consulting services will Approved by the E (Bank) Systems - Project aims to strengthen be required. Directors on May 2 economic policymaking and management 1992. Loan was si through institutional development and June 12, 1992. improving the Treasury's data systems. Environmental Assessment Category C. Ministry of Health 100.0 Health II - Project will strengthen Consulting services will Next preparation r (Bank) public health services in likely be required for scheduled for Jul] Central/Eastern Anatolia, and assist in implementation. 1992. decentralization of state hospitals administration. Environmental Assessment Category: To Be Determined. Antalya About (R) Antalya Environment - Project would Consulting services will Second preparatioi Municipality 170.0 include water supply, sewerage, solid be required for mission tentative: (Bank) waste and coastal zone management preparation and scheduled for Novi components and assist the Antalya execution. Proposals 1992. Municipality in establishing an have been invited from appropriate policy and institutional short-listed firms. framework for environmental management. Environmental Assessment Category B. Ministry of 100.0 Basic Education - Project would support Consultants likely to be First preparation National Education (Bank) the expansion of basic schooling (Grades required for scheduled for Jul through 8) to improve system coverage implementation. and relieve overcrowded schools, with particular effort to raise the school attendance of girls. Environmental Assessment Category C. - 77 - Member Country, Amount & Implementing Probable Stage of Processing and Agency- Lender Project Consulting Services Action on Procurement 4 TURKEY (Cont'd) Cukurova Elektrik 270.0 (R) Berke Hydro Power - Would provide Consultant has been Approved by the Executive A.S. (CEAS) (Bank) for installation of 510 MW hydro power selected for project Directors on May 28, plan comprising three units of 170 MW preparation design, and 1992. Loan was signed on each. Would comprise the construction supervision of the June 12, 1992. of a double curvature, thin arch over project implementation. Contract award for the 201 m height, an headrace tunnel of .main-civil works expected 2.0 km length and an inside diameter of in July 1992. 9 m, and an underground power plant. (Cofinancing from IFC and Environmental Assessment Category A. other private sources.) Turkish About (R) Coal Pollution Abatement - This Consulting services will Appraisal mission Electricity 120.0 project, to be developed by the Turkish be required for project scheduled for June/July Authority (TE) (Bank) Electricity Authority (TEK), is from preparation and 1992. TEK's lignite thermal plants to reduce implementation. (Cofinancing expected.) sulphur and NOX pollution. Environmental Assessment Category B. Ministry of About (R) E. Anatolia Watershed Rehabilitation Consultants have been Appraisal scheduled for Agriculture and 100.0 - Improved erosion control, I recruited to assist with June 1992. Rural Affairs, (Bank) reforestation, sustainable dry land preparation. Consultants (Possible financing from Ministry of farming and pasture management programs may also be required to the Global Environment Forestry concentrating on Eastern Turkey; also assist in execution. Facility (GEF) -- see studies and research. Positive Annex C. environmental impact expected. Environmental Assessment Category C. Ministry of Health About Health III - Creation of a National To be determined. Preparation postponed 100.0 Hygiene Institute and support for pending Government . (Bank) development of a regional network to decisions on technical public health laboratories. and political options. Environmental Assessment Category C. To be determined About Employment and Training - To support Consultants will be Negotiations awaiting 60.0 development of employment-oriented required for execution. Government commitment on (Bank) training, improvement of labor market . proposed actions. information, career guidance counseling, improved employment services occupational standard development, and promotion of women's employment. . Environmental Assessment Category C. Bursa Municipality About (R) Bursa Environment - The project will Consultants have Appraisal mission and Buski 105.0 provide sewerage, water supply and solid prepared a feasibility scheduled for end June (Bank) waste management facilities, and will study for solid waste, 1992. assist in strengthening policies and and feasibility studies (Cofinancing is being institutions, to control causes of for sewerage and water sought.) environmental degradation. supply. Local Environmental Assessment Category B. government intends to invite proposals for detailed design and technical assistance services. - 78- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement 4 TURKEY (Cont'd) Ministry of About (R) Agricultural Research - Civil works, Consulting services will Approved by the Executiv( Agriculture and 55.0 equipment and fellowships to assist in be required to assist Directors on May 21, Rural Affairs, (Bank) strengthening Turkey's agricultural Government in 1992. Loan was signed oz Ministry of research programs, concentrating on strengthening research June 12, 1992. Forestry programs of benefit to the less coordination and developed regions. Project expected to planning, coordination include research in support of better of overseas training, environmental practices. Environmental and assisting specific Assessment Category C. research programs. Ministry of About (R) Southwest Coast Environment - Consultant has prepared Preparation mission is Tourism 200.0 Sewerage and sewage treatment draft town reports. scheduled for September (Bank) facilities, water supply facilities, Consultants will also be 1992. solid waste facilities, and training and required for subsequent (Cofinancing is being * technical assistance for selected detailed design, sought.) locations along the country's construction southwestern Mediterranean and Aegean supervision, and other Coasts. Project will bring about major technical assistance. improvements in environment by reducing pollution of sea and shore, and risk of contamination of water supplies. Environmental Assessment Category B. YUGOSLAVIA City of Belgrade About Belgrade Environment - Support for To be determined. Preparation under way. 200.0 expansion of water supply system and (Bank) upgrading of sewerage system. Retroactive financing ol Environmental Assessment Category B. up to US$10.0 million i! under consideration. Ministry of About Environment--Rijeka - Support for - To be determined. Further project Environmental 100.0 improving health and enhancing planned processing is on hold. Protection (Bank) tourism in Rijeka Bay area and Istria Coastal areas by reducing air and water Retroactive financing oi pollution, improving water supply, up to US$16.0 million i! improving management of solid waste and under consideration. historic monument preservation. Environmental Assessment Category B. Montenegro Coast About Montenegro Coast Water Supply & To be determined. Preparation on hold Organization for 50.0 Pollution Control - Would provide water pending resolution of Water Supply & (Bank) supply for tourism development and international waterway Sewerage (CPRVK) pollution control facilities for issue. protection of environment. To include water and waste treatment facilities, . Retroactive financing a water distribution and sewage collection US$5.0 million to cover networks, and ihstitutional development. civil works is under Environmental Assessment Category B. consideration. Member Country, Amount & Implementing Probable Stage of Processing and Agency- Lender Project Consulting Services Action on Procurement IV. LATIN AMERICA AND CARIBBEAN REGION ARGENTINA To be determined ) 300.0 (N) Reform of Provincial Finances - Consulting services will Project preparation undi (Bank) Project includes: (a) modernizing. not be required. way. framework of federal/provincial fiscal relations; (b) consolidating PSRL improvements on federal budgeting; and (c) adjustment of provincial finances. Environmental Assessment Category C. To be determined To Be Debt and Debt-Service Reduction - To be determined. Project preparation undo Deter- Support - To fund interest support way. mined component of a comprehensive debt and debt reduction program with commercial banks. Environmental Assessment Category C. .Ministry of 400.0 (R) Financial Sector Adjustment - To Consulting services will Appraisal mission Economy (Bank) support major actions to close, sell or be required on a limited scheduled for late June restructure public banks while retaining basis. 1992. an open, competitive, financial environment. Environmental Assessment - Category: To Be Determined. To be determined 300.0 (R) Capital Market (formerly Financial Consulting services will Pre-appraisal mission (Bank) Sector Development Ln.) - Supports be required in Bank scheduled for late June private sector investment and financial supervision capital 1992. sector and capital market development. market development, and -Environmental Assessment Category C. financial and investment policies. Ministry of 300.0 (R) Public Enterprise Reform II - Consultants have been Post appraisal mission Defense (Bank) Consolidation of public enterprise sale identified and .are being scheduled for late June and restructuring programs. financed by Japanese 1992. Environmental Assessment Category B. Grant and PEREL. Direccion General 20.0 Second Tax Administration - To complete Consulting services Approved by the Executi Inpositiva (DGI) (Bank) the modernization process of the will be required for Directors on April 14, Direecion General Impositiva (DGI), development of software 1992. Argentine's main revenue agency. The and management project will cover a four-year consulting development institutional infrastructure development 'services. on all aspects of DGI. Environmental Assessment Category C. Ministerio de 150.0 Maternal Child Health and Nutrition - Consultant services will Project preparation und Salud y Accion (Bank) Human resource maintenance through be required. way. Social health and nutrition support for vulnerable groups. Environmental Assessment Category C.' - 80 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project Consulting Services Action on Procurement ARGENTINA (Cont'd) Direccion Nacional 300.0 Road Maintenance - Avoidance of: Consulting services will Appraisal mission I de Vialidad (Bank) (a) costly road repair and be required for road scheduled for reconstruction; (b) unnecessary design, supervision, August/September 1992. increases in vehicle operations cost. institutional Improvement of coordination and improvement and cooperation between agencies (national training. and provincial). Improvement of road activity funding. Environmental Assessment Category B. Ministerio de 100.0 Buenos Aires Health Development - The . To be determined. Preparation to be starte Salud y Bienestar (Bank) project is still to be defined. Major once agreement is reachE Social institutional and policy reform on project objectives, orientation are envisaged. scope and financing Environmental Assessment: To Be during July 1992 visit t Determined. Buenos Aires. Entidad Binacional 300.0 (R) Yacyreta II - Completion of Yacyreta To be determined. Appraisal report Yacyreta (Bank) first six units, technical assistance completed. for execution of Plan of Action for. Resettlement and Environment Management, Procurement: The civil and implementation of the first phase of works and engineering the associated transmission system. contracts for YACYRETA, Environmental Assessment Category A. awarded under a previou- loan would likely be financed, including 199, invoices up to US$60.0 million. BARBADOS Ministry of 25.0 (N) Structural Adjustment (SAL) - To To be determined. Project preparation undc Finance and (Bank) support trade liberalization, tax way. Pre-appraisal Economic Affairs reform, rationalization of public mission scheduled for expenditures, including a review of the July 1992. Government's divestment program, and to support social policies and the safety net. The loan would complement stabilization and adjustment efforts, being undertaken with the IMF and the IDB. Environmental Assessment Category: To Be Determined. To be determined 20.0 (R) Human Resources - To strengthen the To be determined. Appraisal mission (Bank) post secondary technical training and scheduled for late June related teacher training through 1992. provision of improved facilities, equipment, and staff training and the articulation between the training program and the labor market. Environmental Assessment Category C. Ministry of Works 18.0 (R) Road Maintenance & Rehabilitation II Consulting services will Negotiations completed. (Bank) - Financing of a 5-year investment plan, be required for road Approved by the Executi, safety program, technical assistance and maintenance and workshop Directors on June 18, training. Environmental Assessment improvement, and for a 1992. Category B. road network study. Retroactive financing i: proposed for some consulting services and equipment. - 81 - 'ber Country, Amount & plementing Probable Stage of Processing and ncy Lender Project Consulting Services Action on Procurement 'IZE \ize Electricity 9.0 (N) Power Development - This project To be determined. Project under Urd (BEB) (Bank) would assist in the financing of: preparation. (a) the construction of .a 115 kv transmission grid running from the border-with Mexico to Belize City and Belmopan; and (b) consulting services to assist the Government in (i) the preparation of a regulatory framework for the power sector; andy (ii) the preparation of plans for the privatization of BEB. Environmental Assessment Category B. istry of 15.0 (R) Belize City Municipal Infrastructure To be determined. Preparation studies to eign Affairs, (Bank) - Will help the city to rehabilitate and begin in September 1992 noic develop its infrastructure, strengthen and to be completed in elopment and its administrative capacity, and promote April 1993. A PPF \cation economic growth. Environmental request is being Assessment Category B. processed. Listry of 8.0 (R) Private Sector Development - To To be determined. Pre-appraisal mission in nomic (Bank) provide a line of credit and technical the field. elopment, assistance in support of: (a) private tral Bank enterprise investment and development; and (b) policy reforms to enhance the enabling environment for sustained. and efficient private sector development, and to make the financial sector more efficient and competitive. Environmental Assessment Category B. IVIA be determined 20.5 Municipal Development - Policy reform Consulting services will Identification completed. (IDA) and institutional strengthening in the be required. Next preparation mission area of municipal finance and , scheduled for July 1992. management. Line of credit for Financing is provided by investment projects in municipal a PPF of US$1,500,000. infrastructure and services. Environmental Assessment Category B. )e determined 41.5 Public Enterprise Reform and Private Consulting services will Preparation mission (IDA) Sector Development - To assist the be required for assess- scheduled for late June Government's program of privatizing ment of major sector. 1992. public enterprises, establish appropriate regulatory framework and help remove legal constraints inhibiting private enterprises. Environmental Assessment Category B. ec determined 25.0 Education Reform - Support the To be determined. . Project preparation under (IDA) Government's planned reform of the way. - education system and decentralization of Financing is provided by- public education services. a PPF of US$950,000. Environmental Assessment Category C. -82- Member Country, Amount £ Implementing Probable Stage of Processin Agency Lender 2 Project 3 Consulting Services Action on Procure BOLIVIA - (Cont'd) Fondo Nacional 7.0 (R) Environmental Technical Assistance- Consultants will be Appraisal report u Para el Medio (IDA) Will strengthen key environment-related required for preparation. Ambiente (FONAMA) institutionst and develop the human environmental legal and resources necessary to plan, evaluate regulatory works and Financing is provi and implement action programs and environmental impact a PPF of US$680,0C develop an effective legal and assessment. - Japanese Grant Fac regulatory system for environmental of US$314,000. protection and natural resource management. Environmental Assessment (Financing for Category C. biodiversity will from the GEG and J Switzerland.) To be determined 35.3 Environment, Industry and Mining - To be determined. Project preparatic (IDA) Further support for mining sector reform way. program and development of private sector in an environmentally sound manner. Environmental Assessment Category B. Ministry Transport 80.0 (R) Road Maintenance Rehabilitation II - Technical assistance Approved by the E and Communications (IDA) Maintenance and rehabilitation of the extended for the road Directors on June road network, following program worked maintenance financing 1992. out applying the maintenance management study has been system.(SAM) and the equipment completed. management system (SAE). Environmental Assessment Category B. Yacimientos 160.0 (R) Power/Gas Pipeline - To increase Consultants will be Project preparati Petraliferos (Bank) exports by-the sale of electricity to required for been held pending Fiscales , Brazil, burning Bolivia natural gas, and construction, discussions betwe Bolivianos (YPFB); to support gas field development. The supervision, and Bolivian and Braz Empresa Nacional project will consist of building a gas- project management. Governments on di de Electicidad fired power plant near the Brazilian sale of natural g (ENDE) border and its associated gas pipeline Brazil. Given tb from Santa Cruz and providing technical decision of the assistance for exploration promotion and Government agains institutional strengthening of YPFB and construction of a ENDE. Environmental Assessment Category thermoelectric pl A. export electricit further reporting discontinued. Retroactive finar up to 10% of the being considered. BRAZIL Federal Railway 250.0 (N) Railway Reform - Restructuring of To be determined. Identification ur Export Company (Bank) RFFSA and rehabilitation of track in (RFFSA) major railway corridors to enable privatization of railway services. . Environmental Assessment Category B. -83- Member Country, Amount & Implementing Probable Stage of Processing and eAgency Lnder Project 3 Consulting Services Action on Procurement BRAZIL (Cont'd) To be determined 150.0 Metropolitan Transport (Rio de Consulting services will Appraisal report under (Bank) Janeiro) - The decentralization of the be required for preparation. Companhia Brasileira de Trens Urbanos engineering work, (CBTU) from the federal government to supervision and the state, Rio de Janeiro, to phase out institutional federal subsidies. Includes substantial strengthening. institutional and managerial reforms. Emphasizes modal integration, and financial policy reform. Environmental Assessment Category B. Banco de Up to (R) Water Quality and Pollution Control To be determined. Appraisal mission Desenvolvimento de 125.0 (Minas Gerais) - To assist sector scheduled for June 29, [Minas Gerais (Bank) authorities in most congested areas to 1992. (BDMG) develop methodologies to tackle the cleaning of environment, and specifically to save the scarce water , sources for human consumption and agriculture. Environmental Assessment Category A. Banco de Up to Minas Municipal Development - Introduce To be determined. Project preparation under IDesenvolvimento de 250.0 policy and institutional reforms in way. IMinas Gerais (Bank) selected municipalities and municipal water companies in the State of Minas Gerais; and improve services in selected urban subsectors. Total project cost is US$300.0 million. Environmental Assessment Category: To Be Determined. IINFRAERO Up to INFRAERO Reform - Finance time-slice of To be determined. Project under 100.0 INFRAERO's investment program and preparation. (Bank) support sectoral regulatory reforms. Environmental Assessment Category: To Be Determined. Ministerio Infra- Up to Telecom Reform - Assists with To be determined. Project under Estrutura 200.0 restructuring, modernization and preparation. (Bank) expansion of telecommunications services. Will also finance a time- slice of sector investment program and address sector-wide policy issues. Environmental Assessment Category: To Be Determined. Companhia Vale Up to (R) Environmental Conservation and To be determined. Appraisal report under do Rio Doce 60.0 Rehabilitation - Supports the preparation. (Bank) environmental program of Compania Vale do Rio Doce (CVRD) which includes: (a) an industrial and mining pollution control component; (b) natural resources component; (c) a research jand development component for the preservation of ecosystems; and (d) socially-oriented investments. Environmental Assessment Category B. -84 - Member Country, Amount & Implementing Probable Stage of Processing aj Agency ' Lender Project Consulting Services Action on Procurement BRAZIL (Cont'd) Departamento Up to Federal Highway - Will support Consulting services Project preparation u Nacional de 250.0 decentralization of highway will be required for way.. Estradas de (Bank) administration and private sector engineering and work Rodagem (DNER) involvement in highway construction, supervision, and for operation and maintenance. Would also institutional help finance the federal highway strengthening. rehabilitation and maintenance programs. Environmental Assessment Category B. Ministry of Up to Northeast Basic Education II - Will To be determined. Appraisal mission Education and 150.0 support basic education in up to three scheduled for June 29 States (Bank) northeast states. Environmental 1992. .Assessment Category C. (Cofinancing of US$1.4 million has be approved with Japanes Grant Facility.) Secretaria de Up to Land Management IV (Mato Grosso do To be determined. Project preparation u Agricultura, 75.0 Sul) - To improve natural resources way. Pecuaria e (Bank) protection in Pantanal's watershed and Abastecimento do generate sustainable productivity gains Estado de Mato through improved land management and Grosso do Sul soil conservation in the State of Mato (SECAP-MS) Grosso do Sul. Environmental Assessment Category D. Ministerio de Up to Transport Sector Reform - Assist To be determined. Preparation under wa3 Infras-Estrutura 275.0 Government in implementing a package of Secretaria (Bank) regulatory reforms across the transport Nacional dos sector, including a privatization Transportes program, and in financing high priority investments included in the federal transport program. Environmental Assessment Category B. Brazilian Urban Up to Metropolitan Transport - Sao Paulo - The Consulting services will Approved by the Execi Rail Company 126.0 decentralization of the CBTU from the be required for Directors on March 3. (CBTU) (Bank) federal government to the state, Sao engineering work, 1992. Paulo, to phase out federal subsidies. supervision and Includes substantial institutional and. institutional managerial reforms. Emphasizes modal strengthening. integration, and financial policy reform. Environmental Assessment Category B. Secretaria de Up to (R) Water Quality and Pollution Control To be determined. Board presentation Energia e 223.0 (Sao Paulo and Parana) - Help sector scheduled for June 2 Saneamento (Sao (Bank) authorities to address water pollution 1992. Paulo), Secretaria issues through a self- sustained de Planejamento investment project in the most congested (Parana) areas of Brazil, to develop methodologies to tackle the cleaning of environment, and specifically to manage the scarce water sources for human consumption and agriculture. Environmental Assessment Category A. Banco Nacional de Up to Privatization and Capital Market No consulting services Appraisal report und Desenvolvimento 315.0 Reform - Develop capital markets in required. preparation. Economico e (Bank) coordination with financial sector Sociale (BNDES) strategy and to support preparatory work by Brazil's Privatization Commission and BNDES in the privatization of public enterprises. Environmental Assessment Category B. - 85 - Ir Country, Amount & menting Probable Stage of Processing and . Lender -1 Project - Consulting Services Action on Procurement L T1d) try of Health Up to Quality Assurance and Health To be,determined. Project preparation under 125.0 Promotion - Support for strengthening way. (Bank) government's normative and regulatory roles in health as well as provision of consumer information. Environmental Assessment C. Nacional de Up to (R) National Industrial Pollution Consulting services will Approved by the Executive volvimento 50.0 Control - The project consists of: be required by state Directors on May 28, nico e (Bank) (a) a line of credit for financing of environmental protection 1992. le (BNDES) pollution abatement investments by agencies. tate enterprises identified in approved state onmental industrial pollution control strategies: Les and (b) technical assistance for state environmental protection agencies. Environmental Assessment Category D. &erio de Acao Up to Water Sector Modernization - Finance To be determined. Approved by the Executive 250.0 investments and bring about sector Directors on March 10, (Bank) policy reforms, improved operations 1992. investment planning, and pricing. Environmental Assessment Category B. rosso State Up to (R) Mato Grosso Natural Resource To be determined. Approved by the Executive lariat of 205.0 Management - Consolidation of the first Directors on June 18, Ing (Bank) phase of North West projects in Mato 1992. Grosso, through improvements in the policy framework; intensification of agriculture in areas with sustainable development potential; forest management and conservation; environmental and tribal protection and continued support for small farmer community projects, infrastructure and social service. Environmental Assessment Category B. eo Up to (R) Hydrocarbon Transport and Processing Consulting services Approved by the Executive eiro S.A. 260.0 - Assistance to PETROBRAS to develop: will be required to Directors on June 26, BRAS) (Bank) (a) high priority product distribution provide PETROBRAS with 1991. Loan signing facilities; (b) programs to enhance an in-house capability tentatively scheduled for natural gas utilization to reduce for assessing: (a) risk June 26, 1992. product losses and for more efficient in connection with energy utilization and environmental operations; (b) air Procurement: Advance control; and (c) technical assistance in quality; and contracting up to transportation planning, indtstrial risk (c) pollution. US$60.0 million and and.safety analysis and measures to retroactive financing up improve the safety and environmental to US$25.0 million of the conditions of transportation and loan amount would be refinery operations. Environmental considered to finance Assessment Category A. urgently needed works. 11o State Up to (R) Land Management III (Sao Paulo) - To To be determined. Preparation under way. triat of 75.0 generate environmental benefits and ture and (Bank) sustainable productivity gains through improved land management and soil conservation within about 2,000 microcatchments involving 120,000 farmers in Sao Paulo. Environmental Assessment Category D. - 86 - Member Country, Amount & Implementing Probable Stage of Proces. Agency Lender 2 Project Consulting Services Action on Procu BRAZIL (Cont'd) Ministry of Up to Rondonia Natural Resource Management- To be determined. Approved by the Interior/Rondonia 167.0 The project would consolidate the first Directors on Mai State (Bank) phase of Northwest projects in Rondonia, 1992. through policy improvements, agricultural intensification in established areas, forest management support, forest extractive activities, environmental and tribal protection, and continued support for small farmer community projects and social services. Environmental Assessment Category D. Ministry of Up to Northeast Basic Education III - The To be determined. Project preparal Education 250.0 project will support basic education in way. (Bank) up to four states in the Northeast. Environmental Assessment Category C. Centrals Up to Electric Distribution and Conservation - To be determined. Further process: Electricas 300.0 Financing of time-slice of power hold pending re: Brasileiras S.A. (Bank) distribution and conservation of tariff issue (ELETROBRAS) investments in selected utilities. Projects expected to finance investments associated with specific power projects and programs of sector utilities. Includes specific provisions for preparing Environmental Impact Statements and corresponding Action Plans as required by each individual project and country legislation. Does not present major environmental problems. Environmental Assessment Category C. Departmento de Up to (R) State Highways Management Project - Consultant services will Negotiations sc] Estradas de 200.0 Rehabilitation and periodic maintenance be required for for July 13, 19 Rodagem (DER) in (Bank) of state highways and strengthening of engineering, selected states state highway department's maintenance construction supervision Retroactive fin capabilities in the states of Alagoas, and technical would be consid Mato Grosso do Sul, Rio Grande do Sul assistance. 10% of the loan and Santa Catarena. Includes a help start impl, component to strengthen the state of project comp highway agencies environmental capacity. Environmental Assessment Category B. Ministry of Up to Irrigation Subsector II - Private To be determined. Project prepara Agriculture, 175.0 Irrigation (follow-up to Irrigation hold pending Go National (Bank) Subsector I) in Northeast. assignment of p Irrigation Environmental Assessment Category B. project. Secretariat CARIBBEAN REGION Caribbean 11.0 (N) CDB VI - New global line of credit To be determined. Project under Development Bank (Bank) for CDB to be on-lent mainly for OECS preparation. 10.7 countries. In addition to continued (IDA) support for infrastructure development, project would seek to help promote small and medium, industrial agriculture and commercial private firms, expand the' scope of the financial system and modernize overall intermediation. Environmental Adsessment Category C. - 87- r Country, Amount & nenting Probable Stage of Processing and Lender Project A Consulting Services Action on Procurement II REGION d) determined 20.0 (R) OECS Waste Management (formerly OECS To be determined. Project preparation under (IDA) Waste (OECS Environment)) - An OECS way. regional project addressing priority . (Possible financing from investments in both solid and liquid the Global Environmeht waste as well as policies and Facility (GEF) -- see institutional issues related to waste Annex C.) management. Environmental Assessment Category A. ean 7.5 (R) OECS Regional Education - Raising To be determined. Project preparation under pment Bank (Bank)/ the standards and efficiency of primary way. 7.6 and secondary education and increasing (IDA) access to post-secondary technical education through cooperation with the private sector. The project would cover all OECS eligible countries. Environmental Assessment Category C. irectorate j 300.0 Transport Infrastructure Sector II - Mainly local consultants Preparation is stry of (Bank) Project to finance maintenance and will be hired. progressing according to orks (MOP) further development of national road schedule. system. Project is a follow up to Road Sector II (Ln. 3120-CH). Environmental Assessment Category B. i Nacional 20.0 (R) Environmental/Institutional Consulting services will Appraisal mission Lo Ambiente (Bank) Development - Strengthen the be required. .scheduled for late June institutional capacity of the National 1992. Environmental Commission to develop PPF advance for policies, strategies, and action plans US$214,000 approved to at the national level, and sectors finance consultant's engaged in environmental activities. services. Environmental Assessment Category C. io de 95.0 (R) Small Farmer Services - Main To be determined. Approved by the Executive ura (Bank) objectives would be institutional Directors on May 21, strengthening; technical assistance 1992. (extension) and complementary credit focussed on small agricultural Retroactive financing is producers; and land titling. being proposed. Environmental Assessment Category B. *io de 123.6 (R) Health Sector Reform - Improvement Consultants are engaged Project appraisal mission (Bank) of the coverage and the cost- - in project preparation. scheduled for late June effectiveness of basic health services 1992. through reforms of key health sector policies, conduct of studies and of innovative programs in select health service areas and rehabilitation of some health facilities. Environmental Assessment Category B. Nacional 55.0 Irrigation Development - Rehabilitation To be determined. Appraisal report under (Bank) of existing irrigation systems, and preparation. possible development of new irrigated areas. Environmental Assessment Category - 88 - Member Country, Amount & Implementing Probable Stage of Procesa Agency ' Lender Project Consulting Services Action on Procur COLOMBIA Departamento 40.0 (R) Forestry and Environment Protection To be determined. Project preparat: Nacional de (Bank) Program - To assist financing a way. Planificacion timeslice of Colombia's Tropical (DNP)/future Forestry Action Plan in the Western Ministry of the Cordilleras & Pacific coast for: Environment (a) watershed protection (b) biodiversity conservation; (c) natural forest management; (d) reforestation; (e) education, training and forestry research; and (f) technical assistance, studies and Institutional strengthening. Environmental Assessment Category D. Departamento 20.0 (R) Technical Assistance - The project Consulting services will Preparation miss Nacional de (Bank) aims to improve management systems in be required. scheduled for mi Planeacion monitoring and delivery of key 1992. infrastructure and social services. Possible components include: (a) financial management - development of systems and procedures for accounting, budgeting, cash management, auditing and evaluation; and (b) institutional development - restructuring ofadministrative systems and the central sector ministry, implementing agency and sub-national levels. Environmental Assessment Category C. Ministry of 200.0 Secondary Education Expansion - To - To be determined. Project preparal Education (MOE) (Bank) improve the coverage, quality and cost way. effectiveness of secondary education. Environmental Assessment Category C. To be determined 300.0 Financial Sector and Capital Markets To be determined. Project prepara (Bank) Development - To support sector reforms way. to improve the structure efficiency and competitiveness of the financial system, and to remove the existing constraints to capital markets development. In addition to policy support and technical assistance, loan would include multi- sectoral credit line. Environmental Assessment Category C. Ministry of Health 50.0 Health Services Integration II - To be determined. Project prepara (Bank) Decentralization of basic health care way. services and improvement of nutritional status of vulnerable groups. Environmental Assessment Category C. Empresa de 182.0 Pollution Abatement and Sanitation - Consultants will be Financial/insti Acueducto y (Bank) Improve sanitary conditions in the required. action plan and Alcantarillado Bogota river. The project would environmental I include: major sewerage and drainage studies to be ; networks; initial works for abating before appraisz pollution of the Bogota river; secondary water supply networks; and consultancies and training. Studies to control environmental impact under way. Environmental Assessment Category A. . - 89- Member Country, Amount £ lementing Probable Stage of Processing and ency Lender 2 Project Consulting Services Action on Procurement COLOMBIA (Cont'd) ro be determined 200.0 (R) Export Development - Project will To be determined. Appraisal mission in the (Bank) support the components of the field. government's economic modernization program focusing on trade facilitation policies, institutional strengthening measures and financing mechanisms to foster Colombia's non-traditional exports. Environmental Assessment Category B. inistry of 60.0 Agricultural Technology Transfer - To Consulting services will Preparation under way. griculture (Bank) improve agricultural productivity be required for primarily of small-scale farmers through extension research strengthening of applied research and training and the system for extension of technology institutional through municipalities in accordance strengthening. with Colombian decentralization reforms. Environmental Assessment Category C. Lnisterio de 266.0 National Highway Sector III - Consultants will be Approved by the Executive lras Publicas y (Bank) Rehabilitation and paving of priority required for road Directors on March 26, ransporte (MOPT) sections of the national highway maintenance plan, 1992. network, through financing of a time supervision of works, slice of MOPT Investment Program over and studies of the road 1992-1995. River works to close construction industry, secondary river channels in a 200- decentralization of kilometer stretch of the middle national road network Magdalena River. Also, technical and river maintenance studies, training and technical dredging. assistance. Environmental Assessment Category B. NAGRO (Fondo 200.0 Agriculture Credit - Provide a general To be determined. Appraisal report under ra el (Bank) line of credit for agriculture to preparation. nanciamiento del FINAGRO for rediscounting through ctor commercial banks and other financial Retroactive financing is ropecuorio), and institutions. Credit would be made being considered. la Agraria available for medium and long-term loans for agricultural and agro-processing activities. Would be associated with reforms designed to further improve the efficiency of the financial sector including restructuring of the Agricultural Bank (Caja Agraria); and to reduce subsidies through the financial system. Environmental Assessment Category B. ;tituto de 100.0 IFI Restructuring and Divestiture - To To be determined. Approved by the Executive ento Industrial (Bank) assist IFI divestiture program and to Directors on March 24, 'I) support strategic and organizational 1992. changes in IFI. Line of credit to finance sub-loans for investments by Retroactive financing of private productive enterprises. up to US$10.0 million is Environmental Assessment Category B. included. ota District 62.0 Bogota Transport - Improve transport Consultants will be Board presentation ernment (Bank) conditions in Bogota promote more required for work tentatively scheduled for efficient use of existing supervision and November 1992. infrastructure, and strengthen the technical assistance. institutions in charge of planning, Retroactive financing of managing and maintaining the city's up to US$6.0 million will transport infrastructure. Environmental be provided. Assessment Category B. - 90 - Member Country, Amount & Implementing Probable Stage of Processing an, Agency Lender 2 Project 3 Consulting Services Action on Procurement COSTA RICA Caja Costarricense 30.0 Health and Nutrition - The project would To be determined. Project preparation un del Seguro Social (Bank) support the implementation of the way. (CCSS) and Government's state reform program for Ministry of Health the health/nutrition sectors, focusing on: institutional development; strengthening of basic health delivery systems; privatization of services; studies; and operational research. Environmental Assessment Category C. Instituto 20.0 (R) Water Supply II - Improvements of Consultants will be Appraisal mission Costarricense de (Bank) water supply and sewerage facilities in required for work tentatively scheduled Acueductos y San Jose and surrounding areas and supervision and August 1992. Alcantarillados institutional strengthening and technical assistance. (AyA) technical assistance to nationwide water company. Environmental Assessment Category B. Ministry of Up to (R) Structural Adjustment III - To To be determined. Appraisal mission Finance 100.0 continue/providing assistance to Costa tentatively scheduled (Bank) Rica's structural adjustment and end June 1992. economic recovery efforts. Environmental Assessment Category C. DOMINICAN REPUBLIC Corporacion 60.0 (N) Power II - The project would To be determined. Project under Dominicana de (Bank) include: (a) the construction of a preparation. Electricidad 125 MW coal-fired thermal plant, a substantion and a transmission line; and (b) technical assistance to (i) prepare and implement a comprehensive security package; (ii) strengthen sector regulatory capabilities; and (iii) facilitate the implementation of the privatization strategy yet to be defined with IDB financing. Environmental Assessment Category A. To be determined 50.0 Private Sector Development - Will To be determined. Appraisal mission (Bank) support structural reform in the scheduled for late Jt financial sector aimed at establishing a 1992. transparent and competitive financial structure, as well as reforms in the trade, taxation and foreign investment regimes. Will also provide general line of credit to finance investment requirements by the private sector following market mechanisms for the allocation of credit and establishing the on-lending terms. Environmental Assessment Category C. Ministry of Public 80.0 (R) Fifth Road Rehabilitation and Consultants will be Approved by the Exec, Works (Bank) Maintenance (formerly Highway required. Directors on June 20 Maintenance V) - Financing of a five- 1991. Loan was sign year road rehabilitation plan, June 3, 1992. equipment, technical assistance and training. Environmental Assessment Category B. - 91 - ber Country, Amount & Lementing Probable Stage of Processing and lacy I Lender 2 Project 3 Consulting Services Action on Procurement INICAN IBLIC t'd) ituto Nacional. 75.0- Irrigated Farming Development - Increase To be determined. Further preparation under ecursos (Bank) agricultural output and productivity w - way by FAOICP. aulicos from areas with existing irrigation . - infrastructure. Project will include measures to protect against salinization. Environmental Assessment Category B. DfOR stry of Public. 70.0 (R) Social Development II/Health and- Consulting services will Board presentation th (Bank) Nutrition - To strengthen primary health be required. scheduled for July 1992. care system and increase impact and PPF advance of efficiency of nutrition programs. US$1,072,000 available to Environmental Assessment Category C.. finance consultants' services, office equipment, and pilots to strengthen implementation capacity. Retroactive financing app3roved. terio de . 16.0 (R) Mining TA - Support restructuring Consultants will be Appraisal mission ia.y Minas (Bank) and strengthening of institutional required. tentatively scheduled for framework to foster private sector September/October 1992. investment, and improve organization of small scale gold mining including environmental control and social issues. Environmental Assessment Category A. erio de 20.0 (R) Technical Assistance Environment - Consultants will be - Appraisal mission "a y Minas, (Bank) Technical assistance for addressing required. tentatively scheduled for cretaria de institutional framework for . December 1992. environmental issues in Ecuador. A PPF advance of Environmental Assessment Category C. US$450,000 has been approved. (Global Environment Facility (GEF) financing available -- see Annex C.) ,acion 75.0 Private Sector Development - Financing Consulting.services may Board presentation date tera (Bank) for medium and large scale manufacturing be required for to be scheduled. Sand service enterprises. Supports technical assistance. policies of trade and financial liberalization. Environmental Assessment Category B. VADOR ry of To be (N) SAL II - Continued support for the. Consulting services will Identification mission ng Deter- Government's economic reform program. not be required. completed. Project mined Focus will likely be on reform of the identification under way. (Bank) public and financial sectors and trade, Preparation mission tariff and taxation, with an appropriate - tentatively scheduled for social sector emphasis. Environmental September 1992. Assessment Category. - 92 - Member Country, Amount . Implementing Probable Stage of Processing Agency Lender 2 Project Consulting Services Action on Procureme EL SATVADOR (Cont'd) Ministry of 43.0 (R) Agriculture Sector Reform and Consultants will be Appraisal report un Agriculture and (Bank) Investment - Support for the required. preparation. Livestock - Government's sectoral reform and (Japanese Grant of investment program, focussing especially US$0.5 million and on research extension services. - advance of US$1.5 a Environmental Assessment Category B. are available to f£ consultant servicez equipment.) GUATEMALA Ministry of 15.0 (R) Social Investment Fund - Loan would To be determined. Joint review of prc Finance (Bank) support establishment of Social design with Goveru Investment Fund to finance very small and reappraisal of social/basic infrastructure and ongoing. Final productive projects in rural areas being processing pending carried out by Municipalities, community settlement of arre; organizations and non-governmental organizations. Sub-project design and appraisal criteria would address environmental concerns as aporopriate. Environmental Assessment Category B. Ministry of Health 25.0 Health/Nutrition Sector - Loan would To be determined. Project preparatio (Bank) support government efforts to strengthen has been suspended management of Health Sector, including pending settlement improved and expanded primary health arrears. care, and nutrition programs. Environmental Assessment Category B. Government and- 100.0 (R) Structural Adjustment - This quick- To be determined. President's report Banco de Guatemala (Bank) disbursing loan would support fiscal, preparation. financial sector and trade reform as part of a package of stabilization, adjustment, and increased social sector investment measures. Environmental Assessment Category C. Ministry of 31.5 (R) Secondary and Regional Road Consultants will be Approved by the E: Communications, (Bank) Rehabilitation - Strengthening of sector required. Directors on Decei Transport and planning and road management 1988. Loan signii Public Works rehabilitation of 390 km of gravel delayed pending (MCTOP) secondary earth roads, 180 km of paved . settlement of arr, roads, construction of about 500m of small bridges, equipment, training and Retroactive finan technical assistance. US$1.5 million wo provided GUYANA Guyana Water 10.0 (N) Water Supply Technical Assistance To be determined. Project identifie Authority (IDA) and Rehabilitation - Project Includes: May 1992. Projec (a) institutional component to preparation detai strengthen national/regional water worked out. sector agencies and their operations; - A PPF credit is b (b) human resources development program recommended. in the sector; (c) rehabilitation of regional facilities; and (d) establish- ment of an improved operational and maintenance program. Environmental Assessment Category B. - 93 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement GUYANA (Cont'd) Ministry of 5.5 (R) Public Administration - The project Consulting services will Preparation under way. Finance (IDA) would provide emergency assistance to be required. support management of the economic . recovery program through: (a) establishing a system to retain and attract qualified civil servants in key, positions; and (b) strengthening the core policy making and management capacity of the public sector. Environmental Assessment Category C. To be determined 10.2 Private Sector Development - The project Consulting services will Preparation under way. (IDA) would support: (a) reform of the be required in: financial sector to strengthen (a) banking supervision regulation and supervision and to and regulation; (b) the promote capital market development; analysis of financial (b) a reform of the tax system to lower sector institutions; rates while eliminatingrexemptions and (c) tax reform and tax holidays; (c) a reduction and (d) Government services rationalization of tariff rates; and to mining and industry. (d) improvements in Government services to the private sector. Environmental Assessment Category C. Ministry of 15.0 Infrastructure Rehabilitation - Proposed To be determined. Appraisal mission Communication and (IDA) project would consist of: (a) the scheduled for late June Works (MCW) institutional strengthening of MCW 1992. through technical assistance to the A PPF advance of MCW's Central Transport Planning Unit US$0.75 million was (CTPU) for improving transport planning approved to finance and project formulation, to the Roads preparation. Division (RD) for maintenance management and to the Transport and Harbours Department (THD) for ports management and river transport operations; (b) rehabilitation of sea defenses; (c) the rehabilitation and minor alignment of selected high priority main roads; (d) rehabilitation and improvement of feeder roads; (e) the improvement of ports subsector management; and (f) the provision of navigation aids. Environmental Assessment Category B. ;ocial Impact 10.3 (R) Health and Nutrition - To help To be determined. Approved by the Executive kmelioration (IDA) address social costs of stabilization Directors on April 30, 1rogramme Agency and adjustment with focus on primary 1992. Signing scheduled (SIMAP) . health care services in rural services. for end June 1992. Environmental Assessment Category C. 'UYSUCO 25.0 Sugar Industry Rehabilitation and Consulting services Appraisal currently under (IDA) Privatization - To expand sugarcane engaged by Government *way. production to meet preferential quotas for sugar factories and and to rationalize, privatize and privatization. enhance the efficiency of the sugar industry. Environmental Assessment Category B. - 94.- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project 3 Consulting Services Action on Procurement HAITI To be determined 15.3 Private Sector Development - To support To be determined. Preparation on hold due (IDA) development of private sector industrial to suspension of all firms following an industrial operations. restructuring project. Environmental Assessment Category B. Ministry of 20.6 Economic and Social Fund II - Continue To be determined. Identification on hold Finance/ESF (IDA) to assist Government's efforts to due to suspension of all provide: (a) health, nutrition, operations. education, physical infrastructure and employment opportunities; and (b) channel donor financing while strengthening community groups and cooperatives. Environmental Assessment Category: To Be Determined. Ministry of Public 35.0 Road Maintenance & Rehabilitation - To Consultants will be Project preparation on Works, Transport (IDA) improve road maintenance, upgrade key required. hold due to suspension a and Communications road sections and bridges, and all operations. strengthen Ministry of Public Works. Environmental Assessment Category B. Organisme de 28.8 Agricultural Production and Land To be determined. Further processing on Developpement du (IDA) Development - Increase agricultural/ hold due to suspension c Nord (ODN) livestock production by making vacant all operations. public land available to,landless farmers, supporting irrigation development and protecting hilly sectors in the project area against erosion. Land protection measures to be introduced under project. Environmental Assessment Category B. Ministry of 26.1 Forestry and Environmental Protection - To be determined. Approved by the Executh Agriculture, (IDA) To slow the pace of natural resource Directors on - Natural Resources degradation and establish the September 24, 1991. & Rural institutional and policy mechanism for Signing of credit on ho Development Haiti to tackle the problems of due to suspension of all (MARNDR), protection of forests and ecosystems, operations. Directorate of wood production, and of household energy National Resources conservation. Environmental Assessment A PPF advance of Category D. US$750,000 was approved on October 16, 1990. *HONDURAS Empresa Naccional To be (R) Morazan Dam Emergency - The project Consulting services will Appraisal report under de Energia Deter- would support an emergency program to be required. preparation. Electrica (ENEE) mined eliminate water seepage into the (IDA) powerhouse. Components would include: (a) exploratory drilling and grouting; (b) refurbishment ,and expansion of monitoring instrumentation at the dam (c) gravity drainage works; (d) modification to emergency energy source for the water discharge pumps; and (e) technical assistance .for engineering and supervision of works and for institutional strengthening. Environmental Assessment Category C. - 95 - Member Country, Amount & Implementing ' Probable Stage of Processing and Agency Lender Project Consulting Services Action on Procurement HONDURAS (Cont'd) Honduran Social 10.2 (R) Second Social Investment Fund Consulting services will' Board presentation Investment Fund (IDA) (FHIS II) - The credit will finance a be required for scheduled for June 25, (FHIS) range of small-scale subprojects technical assistance. 1992. sponsored by municipalities4 community organizations, and NGOs in four broad Retroactive financing of categories: (a) social infrastructure; 10% is proposed under th (b) basic needs, (c) economic credit. infrastructure; and (d) credit to informal sector entrepreneurs. Environmental Assessment Category C. PRAF, Ministry of 'To be (R) Nutrition/Health - Project would Consulting services will Appraisal mission Health (MOH) Deter- target nutritional assistance and be required. scheduled for end June mined improved health services to the rural 1992. (IDA) and urban poor. Project activities would include: rehabilitation and construction of health centers; provision of equipment; materials, medicines, staff, training,-etc.; health nutrition, and family planning education; distribution of food' coupons to target beneficiaries; rural sanitation works; and technical assistance. Environmental Assessment Category C. Secretaria de To Be (R) Transport Rehabilitation - Project Consulting services Appraisal mission Comunicaciones y Deter- will assist the Government's efforts to will be required. scheduled for end June Transportes mined support export-led growth through 1992. (SECOPT) (IDA) rehabilitation of the transport infrastructure, strengthening of institutional capabilities and increasing the participation of the private sector in the provision of transport services. Environmental Assessment Category B. Ministry of 30.0 Agricultural Sector Adjustment - Focus Consultants will be Appraisal report under Finance/Ministry (IDA) on the structure of sector incentives, required. preparation. of Natutal marketing and price policy, 'land tenure Resource' and forestry issues, and the institutional/organizational strengthen-- ing and redeployment of public sector agricultural agencies. Environmental Assessment Cateiory B. JAMAICA Ministry of 50.0 (N) Trade and Private Secor Development To be determined. Project under Finance, (Bank) - Further rationalization of the trade preparation. Development and regime and public enterprise public Planning . sector expenditure; and continuation of regulatory reform ana privatization. Environmental Assessment Category C. - 96 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement 4 JAMAICA (Cont'd) Ministry of Public 45.0 Transport Sector - Institutional To be determined. Project being identifie Utilities and (Bank) strengthening of Ministry of Public Transport Utilities and Transport; reorganization/ divestment of publicly-owned railways; strengthening/promoting private sector involvement in public transport and highway construction; and investment in ports sector to encourage private sector involvement. Environmental Assessment Category B. Ministry of 45.0 Private Sector - To support private To be determined. Project preparation is Finance, (Bank) sector development through credit under way. Development and - availability. Environmental Assessment Planning Category C. To be determined 50.0 (R) Private Sector Development Consultants are being Negotiations tentativel (Bank) Adjustment - Support to regulatory and identified in the areas scheduled for end Jily institutional reform for private sector of: (a) privatization; 1992. development and the program of (b) regulatory issues; privatization. Environmental Assessment and (c) legal reform. Category C. Previously engaged consultants in the customs reform area will continue. National Water 30.0 (R) Water Supply and Sewerage - To Consultants recently Preparation mission in Commission (Bank) control pollution from wastes discharged initiated the study. the field. to the Kingston Harbor and improve wastewater collection and disposal in the Kingston metropolitan and other tributary areas to the harbor. Environmental Assessment Category B. Planning Institute 30.0 (R) Second Education Reform - Project - To be determined. Project preparation unt of Jamaica (PIOJ) (Bank) would provide support for the way. Government's reform of lower secondary (Japanese Grant Funds education, rationalizing of the exam have been approved in.1 system and efforts to improve social amount of US$1.495 policy analysis and formulation. million on December 20 Environmental Assessment Category C. 1991.) Jamaica Public 50.0 (R) Energy Sector Deregulation and Consultants will be Board presentation Service Company (Bank) Privatization - Restructuring the(energy required for the scheduled for June 30, (JPSC) sector through the establishment of a establishment of a 1992. legal, incentive and regulatory framework for PS framework for private sector; and participation, the establishment of an energy fund to setting up of the fund, facilitate the PS participation; support and the privatization the Government in its privatization program. program of the energy sector; support the implementation of this program through Technical Assistance of the - Government, JPSCO, PCJ and other institutions and agencies. Environmental Assessment Category B. - 97 - aber Country, Amount & plementing Probable Stage of Processing and ancy Lender - Project 3 Consulting Services Action on Procurement MAICA 'at*d) istry of 25.0 Small Farmer Development - Support To be determined. Government,interest in riculture (Bank) Government's program of watershed proceeding with the management and agricultural support project under review. services. Project would focus on major environmental issues affecting agriculture. Environmental Assessment Category D. 6CO 150.0 On-Farm and,Small-Scale Irrigation Consulting services will Identification under way. (Bank) Development (OFSSID) - The project be required to prepare promotes prLvate investments in existing subprojects in the irrigated areas, to save water and field, and about 10% of energy and to intensify cropping and the projects will be diversity crop mix. Environmental invested in surveys, Assessment Category B. studies and designs. retaria de 125.0 (R) Initial Education - The proposed Consulting services will Appraisal report under cacion Publica (Bank) project aims to enhance the early be required. preparation. development,and subsequent school readiness of young children from low- income families, and develop parental understanding of the importance of child development and schooling. Environmental Assessment Category A. /SARH 250.0 Rainfed Areas Development - The proposed Consulting'services will Project preparation under (Bank) projects aims to: (a) improve drainage be required for way. and flood control technology in tainfed environmental areas; (b) improve road infrastructure; assessment. (c) assist in the generation of appropriate agricultural methods: (d) promote transfer of new and existing agricultural technologies; and (e) lessen environmental costs of agriculture. Environmental Assessment Category A. . retaria del 200.0 (R) Labor Market and Productivity To be determined. Project preparation under ,ajo y (Bank) Enhancement - To support improvements in - way. rision Social labor market opportunities of unemployed ?S) and displaced workers, and to help secure employment for, and raise earnings of, workers in small and medium-size enterprises who are among the poorest of those employed. Environmental Assessment Category C. :o Nacional de 400.0 Railway Restructuring - To improve Consulting. services Project preparation under sy Servicios (Bank) efficiency through implementation of a will be required. w way. icos far reaching restructuring plan. OBRAS) Project would assist the railways in . Retroactive financing of becoming a commercially oriented and up to 10% is likely to be financially viable organization. recommended. Environmental Assessment Category B. -98- Member Country, Amount & Implementing Probable Stage of Processit Agency Lender Project 3 Consulting Services Action on Procuref MEXICO (Cont'd) Banco Nacional de 450.0 (R) Housing Market Development (formerly Consulting services will Board presentation Obras y Servicios (Bank) Housing Sector) - To improve the not be required. scheduled for June Publicos operation of the housing market by 1992. (BANOBRAS) increasing the participation of private financial intermediaries in providing financing to lower income families, promoting deregulation of the housing sector. Environmental Assessment Category B. Secretaria de 150.0 (R) Agricultural Technology - The To be determined. Approved by the Ex Agricultura y (Bank) project will,finance civil works, goods,' Directors on May 5 Recuros training, and institutional development Loan was signed on Hidraulicos (SARH) in the public agricultural research and June 17, 1992. extension system with the objective of Retroactive financ improving its capacity to develop and be sought by the transfer technology. It will also Government for exp support technical assistance to the up to US$10.0 mill project executing agencies. incurred before Ju Environmental Assessment Category C. 1992. Comision Federal 400.0 (R) Power Sector - The proposed project To be determined. Project preparatio de Electricidad (Bank) would finance a time slice of the way. (CFE) Comision Federal de Electricidad's (Possible financin investment program in transmission and the Global Environ distribution, focusing on reduction of Facility (GEF) -- technical losses and control of Annex C.) unmetered energy. Environmental Assessment Category B. Fondo de Garantia 300.0 Rural Financial Sector - To improve the Consultants will be Appraisal report u y Fomento para la (Bank) overall efficiency of rural financial required. preparation. Agricultura markets so that they could better Ganaderia y contribute to increasing the country's Retroactive finane Avicultura rate of growth. Environmental up to 10% of the 1 Assessment Category B. amount would be re to finance sub-loa Departmento de 220.0 (R) Transport Air Quality Management Consultants have Appraisal report i Distrito Federal (Bank) (for Mexico City) - Assistance in completed the - preparation. (DDF): Secretaria developing a comprehensive program for preparation of a de Desarollo the control of air pollution in the comprehensive 'program Retroactive financ Urbano y Ecologia metropolitan are,of Mexico City caused for the control of air up to 10% may be s (SEDUE) by urban transport. Environmental pollution in Mexico Assessment Category C. City. No further consulting services will be iequired. Banco Nacional de 200.0 Second Urban Transport - Improvement of Consulting services will Appraisal report t Obras y Servicios (Bank) urban transport systems in medium-size be required to undertake preparation. Publicos cities focussing in particular on public integrated urban (BANOBRAS) transport, road maintenance, traffic transport studies in the Retroactive financ management, technical assistance and participating cities, approximately 10% training, and institutional reforms. and to provide technical likely to be recon Environmental Assessment Category B. assistance and training courses. Banco Nacional de 150.0 (R) Highway Rehabilitation and Safety - To be determined. Project preparatic Obras y Servicios .(Bank) To consolidate and further strengthen way. Publicos maintenance planning and administration (BANOBRAS) for the federal highway network. Retroactive financ Environmental Assessment Category C. up to 10% for expenditures made 1992 would be rept -99- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project 3 Consulting Services Action on Procurement MEXICO (Cont'd) Secretaria de 189.0 (R) Science and Technology - To support Consultants will be Approved by the Executive Comercio y Fomento (Bank) strengthening the technology-related required. Directors on for May 26, Industrial infrastructure support systems, and 1992. Loan signing (SECOFI) and reforming the system for allocating scheduled for June 17, Secretaria de scientific research funds. 1992. Programacion y Environmental Assessment Category C. Presupuesto (SPP) NICARAGUA Fondo de 15.0 (N) Social Investment Fund (FISE) - The Consulting services will Appraisal mission is in Inversiones Social (IDA) project will help finance subprojects not be required. the field. de Emergencia sponsored by municipalities, community (FISE) organizations and NGOs in: (a) social infrastructure; (b) economic infrastructure; and (c) social services. The project will also provide technical assistance for: (a) a living standard and measurement survey; (b) maintenance of physical facilities of the Ministry of Health (MOH) and Ministry of Education (MOE); and (c) refining and articulation of Government's social sector policies. Environmental Assessment Category B. Ministry of 30.0 Transport - Rehabilitation of the Port Consulting services will Project preparation under Construction and (IDA) of Corinto, restructuring of the port be required for way. :Transport authority and rehabilitation of selected feasibility and (Cofinancing will be roads and bridges. Environmental engineering studies. required.) Assessment Category: To be determined. Also institutional restructuring of the port authority. PARAGUAY Corporacion de 60.0 (N) Sewerage - The project will improve Consulting services will Identification mission )bras Sanitarias (Bank) health and infrastructure services to be required for final scheduled for July 1992. (CORPOSANA) the marginal areas of Asuncion. It will design and monitoring of provide collection treatment and water pollution. adequate sewage disposal services to about 250,000 inhabitants, increasing services from 40% to 60% of the year 2010 population. Environmental Assessment Category B. linistry of 3.0 Public Enterprise Reform - To provide The bulk of the project Appraisal mission ndustry and (Bank) technical assistance for implementation cost will be deployed to postponed until Fall ommerce of the Government's policy for finance consultancy 1992. Further project privatization, including the services. preparation needed. establishment of regulatory bodies, financial consultancies for valuation, and investment banking/agency services to implement company sales. Environmental Assessment Category C. - 100 - Member Country, Amount & Implementing Probable Stage of Processing a Agency Lender Project Consulting Services Action on Procurement PARAGUAY (Cont'd) Ministerio de 45.0 (R) Natural Resource Management I - Will To be determined. Project under Agricultura (Bank) improve farm incomes and assist with the preparation. Pre- conservation of natural resources with appraisal mission in specific measures to benefit indigenous field. communities in departments of Alto Parana and-Itapua. Environmental Assessment Category A. National 23.0 (R) Third Rural Water Supply - To Consulting services will Appraisal report und( Sanitation Service (Bank) improve living conditions of rural be required for preparation. (SENASA), population by providing potable water institutional, financial and sanitation to about 250,000 people. and technical Environmental Assessment Category B. assistance. Banco Central 50.0 Private Sector Development - Loan to Consultants likely to be Appraisal report undi (Bank) channel credit to a wide range of final required. preparation. borrowers. The loan will also support the liberalization of the financial sector through strengthening the regulatory and supervisory framework, reform of monetary policy tools, establishment of freely determined interest rates, and the' strengthening of the Central Bank. Technical assistance will be included to strengthen the Central Bank, primarily the Superintendency of Banks. Environmental Assessment Category B. Ministerio de 50.0 (R) Road Transport - Road construction Technical assistance and Appraisal mission it Obras Publicas y (Bank) improvements and rehabilitation to training for field. Government Comunicaciones increase efficiency and capacity in institutional obtained a Project (MOPC) transporting agricultural products and development, detailed Preparation Facility institutional support for the engineering, advance to finance reorganization and modernization of MOPC environmental impact consulting services. and its highway directorate. assessments, transport Environmental Assessment Category B. studies and also staff training in the use of computer software for engineering applications would be provided during project preparation and implementation. Consultants for detailed engineering and to assist with project preparation have been contracted. Proposals for preparing environmental assessments will be invited in May 1992. PERU To be determined 200.0 (N) Municipal Development - Project will To be determined. Identification unde (To be strengthen institutional and policy deter- reform in selected municipalities, mined) including the metropolitan region of Lima, and improve services in selected urban subsectors. Environmental Assessment Category B. - 101 - er Country, Amount & ementing Probable Stage of Processing and I . Lender I Project Consulting Services Action on Procurement 4 I'd) Lttee for 20.0 Privatization Technical Assistance - Consulting services will Project preparation under ,tization (Bank) Technical assistance will be in support be required for way. tl) of the privatization adjustment loan. preparing the companies Environmental Assessment Category C. for privatization and for sectoral policy and regulatory reforms. .cio de Agua 150.0 Lima Water Rehabilitation - To reduce. To be determined. Identification in 1le y (Bank) supply bottlenecks resulting from progress. tarillado de unreliable and unpredictable services, minimize health hazards; and,promote increased efficiency through improved institutional and commercial practices. Environmental Assessment Category B. determined Up to Privatization Adjustment - Privatization Consulting services will Project preparation under 250.0 of public sector companies, especially not be required. way. (Bank) in mining, telecommunications and hydrocarbons, including related policy and regulatory reforms. Environmental Assessment Category: To Be Determined. determined Up to Power Sector Reform and Rehabilitation - To be determined. Project preparation under 200.0 Policy, regulatory and institutional way. (Bank) reforms, including privatization, of the public sector enterprises in power; rehabilitation of existing facilities in power sector enterprises; and possibly new thermal generation plants. Environmental Assessment Category A. determined Up to Basic Health and Nutrition - The project To be determined. Project preparation under 125.0 gill protect the poor during economic way. (Bank) adjustment, by strengthening financing and delivery of targeted health and nutrition programs. Environmental Assessment Category C. determined Up to Primary Education - The project will To be determined. Identification in 100.0 support improvements in quality of progress. (Bank) primary and pre-primary education. Environmental Assessment Category C. y of Up to (R) Transport Rehabilitation - To be determined. Preparation mission rt and 100.0 Infrastructure rehabilitation in scheduled for August ications (Bank) transport, railways and ports sector, 1992. including highways. Environmental. Assessment Category B. ry of Up to (R) Financial Sector Reform - To Consulting services will Approved by the Executive ( and 400.0 strengthen financial sector policies and be required for Directors on June 17, t (Bank) institutions, thereby promoting privatization, banks 1992. competition and efficiency. portfolio'restructuring, Environmental Assessment Category C. and improved efficiency in financial intermediation. -3 - 102 - Member Country, Amount & Implementing Probable Stage of Process Agency Lender 2 Project Consulting Services Action on Procui PERU (Cont'd) Ministry of 300.0 Trade Policy - Adjustment loan to Consulting services Approved by the Economy/Finance (Bank) support government trade reform. will not be-required. Directors on Fel Environmental Assessment Category C. 1992. Ministry of 300.0 SAL - Reforms in the areas of fiscal Consulting services Approved by the Economy/Finance (Bank) policy, public administration, customs will not be required. Directors on Mai and tax reform, labor markets, financial 1992. sector and agricultural marketing. Environmental Assessment Category C. TRINIDAD & TOBAGO To be determined 12.0 (N) Environment Protection and To be determined. Project prepara (Bank) Forestry - To develop a long-term way. strategy and institutional capability to manage the nation's forests, the associated bio-diversity and the lands within the boundaries of the gazetted forest reserves. Environmental Assessment Category D. To be determined 50.0 (N) Power Sector Investment - To assist To be determined. Project prepara (Bank) the Government in identifying Trinidad & way. Tobago's Electric Corporation's (T&TEC) medium-term investment program including the need to rehabilitate existing generation, transmission and distribution facilities together with expansion needs of the power system. The Bank would ultimately finance specific subprojects to be identified with the medium-term investment program including the implementation of a national program for energy conservation. Environmental Assessment Category B. Water and Sewerage 80.0 (R) Sewerage Rehabilitation and To be determined. Preparation mi Authority (Bank) Expansion - The project will include: the field. (a) rehabilitation of selected sewage plants; (b) construction of a new sewage collection system; and (c) a metering program and technical assistance in the areas of planning, administration and maintenance. Environmental Assessment Category B. Ministry of 27.0 Business Expansion and Industrial To be determLned. Approved by tb Planning/Central (Bank) Restructuring - To support physical/ Directors on L Bank financial restructuring of private 1991. sector industries to increase competitiveness in view of increased import competition from trade reforms and to support expansion of non- traditional exports. Environmental Assessment Category B. - 103.- I Country, Amount & senting Probable Stage of Processing and Lender 2 Project 3 Consulting Services Action on Procurement 4 1 Education 31.5 (R) Basic Education Quality Improvement Technical assistance is Preparation work is ing Council (Bank) (formerly Pre-School -and Primary expected in pre-school proceeding. Next EN) Education Improvement) - Project will: education models, preparation mission is (a) expand the coverage of pre-school achievement assessment scheduled for September education focussing on the zones of . systems, management 1992. greatest need; (b) enhance the ihformation systems, and efficiency, equity and quality of evaluation. primary education by providing teaching inputs, establishing a student achievement system and promoting continuity between the primary level and the basic cycle; (c) providing limited infrastructure and policy-oriented studies for the basic cycle; (d) strengthening the institutional capacity of CODICEN through a management information system, and fostering the decentralization of educational administration. Environmental Assessment Category C. Letermined, 12.0 (R) Public Administration Reform - Consulting services will Project preparation under (Bank) Reform and modernization of the central be required. way. administration. Environmental Assessment Category C. o del 65.0 Debt and Debt Service Reduction - Consultant services not Approved by the Executive (Bank) Adjustment loan to support debt and debt required. Directors on May 14, service reduction. Environmental 1991. Assessment Category C. de 10.0 (R) Public Enterprise Reform - To Consultants services to Appraisal report under iento y (Bank) support the removal of legal monopolies, be required. preparation. esto privatization or restructuring of key public enterprises (telecom, ports, gas, aviation). , Environmental Assessment Category C. atermined 200.0 (N) Water Sector Reform - The project To be determined. Identification under way. (Bank) would strengthen state and/or municipal level water companies outside of Caracas, and help establish a well- functioning institutional framework for sector regulation. Environmental Assessment Category B. termined .40.0 (R) Judiciary Infrastructure Development To be determined. Negotiations under way. (Bank) - To strengthen judicial institutions to provide a legal system conducive to private sector development. Environmental Assessment Category: To Be Determined. -104- Member Contry, Amount& Implementing Probable Stage of Process i Agency Telnder 1Project'3 Consulting Services Action on Procuri VENIZEA (Cont'd) To be determined Up to Basic Education - Support the To be determined. Project preparatJI .100.0 decentralization of education to way. (Bank) increase accountability at all levels and to improve the capacity of the Ministry of Education to implement educational reforms. Environmental Assessment Category C. In3titUtO Nacional Up to (R) Natural Resource Protection - Assist To be determined. Appraisal missioi de Parques 140.0 the Government in implementing the field. (Bank) national systems of parks, to strengthen institutional capacity of INPARQUES/ HARNR for environmental education programs and involve the local connunities in the preparation and implementation of management plans for parks and other conservation units. Environmental Assessment Category C. Direccion de Up to Agricultural Extension end Training - To be determined. Project preparat Asistencia Tecnica 80.0 Strengthen agriculture technology way. of the Direccion (Bank) dissemination and agricultural training General Sectoria system. Environmental Assessment de Desarrollo Category C. Agricola, Ministr y of Agriculture and Livestock Production Ministry of 150.0 Htghway Management - Supports Consulting services will Appraisal reporl Transport and (Bank) institutional reforms aimed at gradually be required for preparation. Telecommunications decentralizing responsibilities for engineering, highways ad iWould finance a time-slice construction supervision Retroactive finz of the rehabilitation program for the and technical would be corisidf sector in the 1993-97 period, assistance. 10X of the loan Environmental Assessment Category B. help start impli of project comp, -Consejo Venezolano Up to (R) Urban Transport I -Strengthening of Consulting services Pre-appraisal m do Transportes 100.0 the urban transport sector institutional required in the area of the field. (MTC) (Bank) framework, financing mechanisms and traffic management and local coordination. Infrastructure ad control, transport traffic management investments in six planning and urban municipalities and the Caracas transport economics. metropolitan region. Environmental Assessment Category B. Fundacion Gran Up to (R) Student Loan Reform - Will support Consulting services will Board presentat Mariscal de 58.0 student loans mainly for graduate be required for scheduled for J Ayacucho, (Bank) studies in specialized fields of study. placement and management 1992. Fundacion Escuela Environmental Assessment Category C. of overseas graduate do Gerencia students, technical Social) assistance ad training. - 105 - kember Country, Amount & IImplementing Probable Stage of Processing and ency Lender 2 Project Consulting Services Action on Procurement 7ENEZUELA (Cont'd) linistries of Up to Irrigation Subsector - Establishment of To be determined. Preparation under way. griculture and 100.0 an economically and financially viable ivestock, (Bank) irrigation system policy and support for ivironment and privatization and rehabilitation of enewable public irrigation systems. tesources . Environmental Assessment Category: To Be Determined.' o be determined Up to Power Sector Investment I - Would Consulting services are Project. preparation under 220.0 support a program for institutional required in the area of way. (Bank) technical and financial rehabilitation thermal repowering, of the power sector, and would consist conversion to gas and of: (a) rehabilitation repowering and distribution loss conversion to gas of thermal power reduction program. plants; (b) reduction of technical and non-technical losses; (c) construction of transmission lines and sub-stations; and (d) technical assistance and training. Environmental Assessment Category B. nistry of Health Up to (R) Endemic Disease Control - Would Consulting services will Appraisal mission in the 82.0 strengthen public endemic disease be required in design of field. (Bank) control programs and epidemiological information system and surveillance. Environmental Assessment computerized Category B. epidemiological mapping. aisterio del Up to Caracas Water Rehabilitation and To be determined. Preparation under way. biente y los 100.0 Privatization - Rehabilitation of lursos Naturales (Bank) existing water supply facilities and 1ovables (MARNR) support of the privatization of the Caracas water system operation. Environmental Assessment Category B. be determined Up to Hospital Modernization - Investment in To be determined. Project preparation under 100.0 hospital management modernization along way. (Bank) with policy changes to improve efficiency and quality of health care. Environmental Assessment Category B. istry of Family Up to Low Income Barrios Improvement - To Consulting services to Board presentation 42.5 counterbalance the effect of the be determined at post scheduled for June 23, (Bank) Government's macroeconomic adjustments' appraisal. 1992. program on the urban poor, the project would finance investments to improve infrastructure and studies in the slum areas of the country's major cities. Environmental Assessment Category B. - 106 - Member Country, Amount & Implementing Probable Stage of Processing an Agency Lender 2 Project 3 Consulting Services Action on Procurement V. MIDDLE EAST AND NORTH AFRICA REGION ALGERIA Ministry,of 75.0 Vocational Training II - Quality and To be determined. Preparation under way. Employment and (Bank) efficiency improvements in basic Vocational education. Assessment of quality Training teacher training and provision of pedagogical materials. Environmental Assessment Category: To Be Determined.- Ministry of 175.0 Agricultural Sector Adjustment - Would To be determined. Further project Agriculture (Bank) support medium-term agricultural preparation awaiting adjustment strategy through reforms in Government clearance. policies relating to land markets, prices, input and output marketing, and trade policy. Would identify studies for further reforms. Environmental Assessment Category B. Ministry of 50.0 Irrigation Management Support (IMSP) - Consulting services will IEPS has been circulai Equipment and (Bank) Project would support infrastructure be required. Housing rehabilitation and institutional strengthening of regional authorities responsible for operating existing large scale irrigation system. Environmental Assessment Category B. Ministry of 33.0 (R) Cadastre'- Improve land registration Consultants likely to be Negotiations complete, Economy, (National (Bank) system in urban as well as agricultural required for institution Approved by the Execu Agency for areas to foster the private investment building purposes. Directors on June ll, Cadastre (ANC), and provide an improved basis for land 1992. Conservation taxation. Environmental Assessment Financiere (CF)) Category B. Ministry of 75.0 Local Government Development - Consultants services are Project preparation u Interior and (Bank) Strengthen local capacities in planning, required to prepare a way. Environment budgeting and implementing investments training program for in infrastructure, housing and each wilaya and to study environmental protection and public the feasibility of services; increase generation of local investments in priority resources to reduce dependence on environmental sub- central government budget. projects. Environmental Assessment Category B. Ministry of 50.0 Basic Education Institutional To be determined. IEPS issued on June 2 Education (Bank) Development - Contribute to enhanced 1991. Project quality and efficiency in basic preparation under way education by improving effectiveness in targetted institutions (grade schools and teacher training institutes). Environmental Assessment Category C. - 107 - mber Country, Amount & plementing Probable- Stage of Processing and ency Lender Project Consulting Services Action on Procurement 4 GERIA ont'd) aistry of 25.0 (R) Forestry and Watershed Management - Consulting services will Negotiations completed. Yiculture (-Bank) Pilot project to: (a) design be required for forest Approved by the Executive environmentally sound and technically operations1 watershed Directors on June 11, appropriate forest management and management and research 1992. exploitation techniques to be used in activities. subsequent larger scale operations; (b) reduce operating costs and strengthen forestry institutions; and, (c) prepare erosion control/land management program. Environmental Assessment Category C. istry of 57.0 Sahara Development - To assist Consulting services Approved by the Executive iculture and (Bank) government in defining and implementing will be required. Directors on istry of an environmentally balanced water September 24, 1991. Date ipment development plan of Northern Sahara; to of signing to be expected strengthen organizations dealing with in September 1992. water management and control and to Project implementation increase agricultural production being prepared by the through: (a) technical assistance and Borrower. preparation of studies; (b) institution building; (c) rehabilitation of water extraction and distribution systems, and on farm development in existing oases. Environmental benefits will result from improved drainage, integrated pest management practices: proper use of available water resources, and better water management. Environmental Assessment Category B. etariat d'Etat 50.0 (R) Toxic Wastes (formerly Environmental Preparatory consultant Identification mission Recherche (Bank) Management) - Provides technical study expected by tentatively scheduled for ntifique et a assistance to strengthen the December 1992. early 1993. vironnement institutional framework for environmental management, and assistance to industry for temporary storage of hazardous wastes and surveillance systems. Will also assist Government with establishment of water resource management system and water pollution surveillance. Environmental Assessment Category C. stry of 250.0 (R) Economic Reform Support II - To Consultants likely to be Appraisal rescheduled for omy (Bank) support implementation of trade, price, required. September 1993. tax and enterprise reform measures. Trade reform will focus on rationalizing tariffs and liberalizing foreign exchange allocation. Price reform will support liberalization of price-setting in concert with the establishment of a mechanism to protect vulnerable groups' access to essential goods and services. Fiscal reform will focus on rationalizing direct and indirect taxes. Enterprise reform will focus on restructuring and financial rehabilitation. - 108 - Member Country, Amount & Implementing Probable Stage of Processing ai Agency Lender 2 Project Consulting Services Action on Procurement ALGERIA (Cont'd) Ministry of 125.0 Highways VI - (a) improve Wilaya To be determined. Project under Equipment (Bank) capabilities for road management and preparation. strengthen ME and Wilayas in program monitoring; (b) provide a more adequate balance between contracted and force account maintenance and foster increased competitiveness in the contracting of road works; and (c) rationalize transport sector planning and policy making. Appropriate conditions would be incorporated in the standard tender and supervision documents covering drainage and erosion, cultural property, borrowing pits, and materials disposal. Environmental Assessment Category B. Ministry of 100.0 (R) Urban Transport Enterprise - To be determined. Project under Transport (Bank) Expansion of the provision of bus preparation. Feasib: services in main Algerian cities, studies to start lati through the: (a) rationalization of 1992/early 1993. enterprises operating and management practices; (b) rehabilitation of existing bus fleets and acquisition of new buses; and (c) training and technichl assistance for enterprise operations and financial management, and for the preparation of traffic management studies. The project is foreseen to have a positive impact on the environment, mostly as a result of reduced engine emissions arising from improved operation and maintenance of the bus fleets. Further measures to mitigate vehicle pollution, including fuel substitution, would be pursued through a study. Environmental Assessment Category B. Ministry of 125.0 (R) Construction Industry - Foster the Consulting services will Project has been ren Equipment/ (Bank) efficiency of construction industry by be required to carry out from the Lending Prc Credit Populaire improving its operational environment, industrial restructuring Further reporting w d'Algerie extending credit for modernization studies, and develop discontinued. investments, promoting private sector training programs. initiatives, supporting the preparation of enterprise restructuring programs, and developing training program for enterprise managers. Ensure that investment projects financed by credit component take into account environmental concerns. Environmental Assessment Category B. - 109 - 4ember country, Amount & Implementing- Probable Stage of Processing and kgencya -Lender Project s Insulting Services Action on Procurement IEPUBLIC OF ublic Enterprise 9.0 (R) Technical Assistance for Extensive use of local Board presentation )ffice (IDA) Privatization and Enterprise Sector and international scheduled for June 25, Reform - To assist with the design and consulting services for 1992. implementation of critical reforms all project components including public enterprise reform, including: the Public privatization, training of senior Enterprise Office; managers and reform of the banking training, and sector. Environmental Assessment professional advisory Catemory C. services for enterprise privatization and restructuring and banking sector reform. inistry of Health 27.0 (R) National Schistosomiasis Control - Consulting services will Board presentation (IDA) Project would involve: (a) extension of be required. scheduled for June 25., systematic schistosomiasis control 1992. activities to five governates of the - Delta Region through financing the extension of the national control strategy to the area: (b) rehabilitation and modernization of laboratories and retraining of technicians in other governates; and (c) development of an operational research program and management systems to reduce costs and . ensure sustainability. Environmental Assessment Category C. nistry of About (R) Basic Education - Expanding access Consulting services will Pre-appraisal mission in ucation 43.0 to primary education and improving the be required. the field. (IDA) quality, relevance and resource efficiency of the primary education programs. Environmental Assessment Category C. mistry of About (R) Matruh Resource Management - Consulting services for Pre-appraisal report riculture and 21.6 Promotes sustainable agriculture in feasibility study are being prepared. id Reclamation (IDA) northwest coastal zone by improved financed through a management of rainfall and of Japanese and UNDP rangelands. No adverse or environmental grants. impact are expected. Environmental Assessment Category B/C. .ncipal Bank for About (R) Agricultural Modernization - To To be determined. Project appraisal elopment and 150.0 support promotion of improved technology scheduled for end June icultural (Bank) packages, including selective 1992. dit mechanization of production and processing,. Environmental Assessment Category B. i1ding Materials About (R) Industrial Pollution/Energy Consulting services will Project appraisal mission anization 100.0 Conservation - Debottlenecking and be required. scheduled for September/ (Bank) modernization at three cement plants, October 1992. 60.0 training and environmental protection (Cofinancing possible (IDA) components and policy reforms covering from KfW and DANIDA.) pricing distribution and management. Total project cost about US$300.0 million. Environmental Assessment Category B. - 110 - Member Country, Amount & Implementing . Probable Stage of Processing and Agency ' Lender Project3 Consulting Services Action an Procurement. EGYPT, AA REPUBLIC OF (Cont'd) Ministry of About (R) Nubaria Agriculture Intensification Consultant services Project preparation und Agriculture and 40.0 - Intensify crop production, raise likely to be required. way. Government to Land Reclamation (IDA) yields, and introduce oilseed crops in complete field studies West Nubaria reclaimed lands. Social for drainage and impact positive. Environmental . . agricultural component. Assessment Category B. Ministry of About (R) Private Sector Tourism Consulting services will Appraisal report under Tourism, Tourism 140.0 Infrastructure and Environment not be required. preparation. Development (Bank) Management - Project would support the (Financing from the Authority implementation of a long term strategy Global Environment and policy for tourism development in Facility (GEF) -- see Egypt. Would provide long term Annex C -- has been financing to private sector developers, endorsed.) finance trunk infrastructure by public sector, and provide needed technical assistance. Environmental impact studies are being undertaken. Environmental Assessment Category B. River Transport About (R) Navigational Canal Improvements - Consultants are carrying Project preparation un Authority (RTA) 50.0 Rehabilitation of the Damietta-Cairo out project preparation. way. (Bank) Branch of the Nile, including deepening of the branch, improvement of docks, cargo handling equipment, navigational aids on the Nile River, and.technical assistance. Environmental Assessment Category B. Ministry of About Railways III - To assist Government in Consultant services will Appraisal report Transport 200.0 improving efficiency of railway be required for prepared. Timing of (Bank) operations. It includes track renewal financial and tariff further processing and supply of spare parts for traction, studies, traffic subject to confirmatic rolling stock and workshop equipment, costing, economic of Government's intere replacement of old locomotives and analysis and in Bank financing for coaches and other similar equipment. supervision. project. The project would yield environmental (Parallel financing is gains through diversion of traffic from being sought). roads to railway and replacement of old locomotive with diesel and electric powered units. Environmental Assessment Category C. IRAN Ministry of 175.0 (N) Irrigation Improvement - Project Consulting services Project preparation ui Agriculture/ (Bank) would support actions to improve undecide'd but likely to way.. Ministry of Energy irrigation operations in a number of involve water and Water provinces. The components could management, irrigation include: (a) investments for technology, and/or rehabilitating, extending and agricultural production modernizing structures and equipment for systems. gravity fed and controlled irrigation systems, together with institutional support for improving extension operations and providing inputs and farm machinery, for strengthening planning, training and technical assistance, and for project administration. Support would also be provided for studies on technical and policy issues related to the irrigation subsector. Environmental Assessment Category: To Be Determined. - 111 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' . Lender 2 Project Consulting Services Action on Procurement 4 IRAN (Cont'd) Tehran' 77.0 (R) Tehran Drainage - The project- Consultants have been Approved by the Executive Municipality (Bank) consists of providing a storm water retained. Directors on May 28, collection and disposal system in the 1992. Loan was signed on city of Tehran. This system would June 5, 1992. protect the central part of Tehran and the low lying areas to the south of the city from frequent floodl. Total project cost is estimates at US$156.0 million, of which US$77.0 million is in foieign exchange. Environmental Assessment Category B. Sistan-Baluchistan 57.0 (R) Sistan River Flood Works Consultants have been Approved by the Executive Regional Water (Bank) Rehabilitation - Project would consist retained. Directors on May 28, Board of: (a) rehabilitating, upgrading and 1992. Loan was signed on expanding the essential flood control June 5, 1992. works in the Sistan river and Hirmand lake; (b) providing Sistan river training works and a proiram for early flood warning and emerge cy evacuation; and (c) monitoring perfo ance of flood works and river regime ich would provide protection to the Sistan river flood plain. Total project cost is " about US$100.0 million, of which about US$57.0 million would be in foreign exchange. Environmental Assessment Category B. TREC To be (R) Power Sector Efficiency Consulting services will Project preparation under deter- Improvement - Project liiely to include be required to supervise way. mined one or more of the follo4ing components: construction and (Cofinancing will be (a) conversion of Qom gas turbines to undertake studies. required.) combined cycle operation; and (b) studies and trainingJ Environmental Assessment Category B. MOROCCO Ministry of 50.0 Social Housing Development - The To be determined. Project preparation under Housing (Bank) objective of the project is the way. reduction of poverty stricken areas and assistance to low income families. This will primarily be accomplished by the provision of serviced lots. Environmental Assessment Category B. To be determined 150.0 Social Priorities Support - Project To be determined. Identification scheduled (Bank) would support: (a) implementation of for July 1992. the social action program (defined under SAL II); (b) address systematic'issues and cross-sectoral consttaints in the public management of huma In resources and social sectors; and (c) improvement of the provision of basic social services to disadvantaged groups. Environmental Assessment Category: To Be Determined. - 112 - Member Country, Amount & Implementing Probable Stage of Processing a Agency Lender Project Consulting Services Action on Procurement MOROCCO (Cont'd) Ministry of Public 70.0 Industrial Training - Project would: To be determined. Project preparation u Works (Bank) (a) emphasize linkages between the way. employers in the industrial sectors and (Possible financing f the training institutions; (b) promote the Japanese PHR Fund in-company training; and (c) provide human development to enterprises. Environmental Assessment Category C. Ministry of About (R) Rural Poverty Reduction and Consulting services are Project preparation t Interior, 30.0 Environment Protection - The project required for project way, including IEPS. Direction Generale (Bank) would provide for economic opportunities preparation. (GEF cofinancing des Collectivites and social services to the rural poor, envisaged.) Locales in particular in mountain areas, while at the same time protecting the biodiversity environment. Also, construction of a rural road access network as a key condition for Bank support. Environmental Assessment Category D. To be determined To be Industrial Technology Enhancement - To be determined. Components are being deter- Project will support the development of identified. mined metrology, standards, testink and quality insurance infrastructure. It will also promote industrial research and development, by making research activities more market based. A venture capital fund may be set up to finance innovative technological projects and new enterprises. Environmental Assessment Category: To Be Determined. To be determined 25.0 (R) Irrigated Areas - Agricultural To be determined. / Preparation report u (Bank) Support (formerly Research and Extension way. Pre-appraisal In Irrigated Areas) - Project would mission scheduled fo provide funding for: (a) strengthening October 1992. extension services of the regional irrigation authorities (ORMVA) and promote the.participation of farmers' organizations and the private sector in the development and dissemination of improved technology; (b) an applied research program; (c) staff and farmer training; (d) complementary investments to extend soil testing and develop ,appropriate mechanization; (e) establishment of a monitoring system; and (f) studies. Environmental Assessment Category B. Ministry of 150.0 (R) Second Agriculture Sector Investment To be determined. Identification missi Agriculture and (Bank) (ASIL II) - Loan is in support of a scheduled for late J Agrarian Reform tranche of Morocco's investment program 1992. in agriculture. It would also promote further sector policy and institutional reforms. Environmental Assessment Category: To Be Determined. - 113 - Wember Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project ' Consulting Services Action on Procurement DROCCO (Cont'd) finistere de 100.0 (R) Wastewater Irrigation - The project Consulting services will IEPS issued. L'Information et (Bank) would be a follow-up to the be required for project Government's proposals le l'Interieur implementation of sewerage and primary preparation, including awaited for treatment facilities for Casablanca, the preparation of interministerial -Agadir and Khouibga, and would include: environmental impact coordination for project (a) additional treatment as required; studies. studies. (b) irrigation systems; and (c) institutional development aiming to set up appropriate organizations for implementation, operation and maintenance. Environmental Assessment Category AID. inistere de 23.0 (R) Labor Market Intermediation - To be determined. Appraisal mission 'Emploi (Bank) Development of labor market information postponed until Fall and intermediation mechanisms to 1992. increase mobility and access to jobs, facilitate small-scale job creation, and promote in-service training. Environmental Assessment Category C. RPT 100.0 Second Telecommunications - To support Consulting services Appraisal mission just (Bank) sector restructuring (including may be required. returned. Staff promotion of private sector investment appraisal report under in value-added services and development preparation. of a new legal and regulatory framework) and to finance expansion of network, with possible parallel financing from multilateral and bilateral agencies. Environmental Assessment Category B. be determined 50.0 Higher Education Funding Reform - Aims To be determined. Preparation under way. (Bank) at diversifying higher education financing by promoting cost efficiency, and supporting qualitative improvements. Environmental Assessment Category C. nistry of 75.0 National Watershed Management - To To be determined. Project being identified. riculture and (Bank) improve land use and natural resources rarian Reform management in mountain areas and reduce siltation,in reservoirs and associated hydraulic infrastructure. Main components would include: (a) institutional and organizational development (b) improvement of legal framework for land use in mountain areas; (c) investments in selected watersheds; (d) applied and adaptive research and extension; and (e) technical assistance and training. Environmental Assessment Category D. adit Immobiler 100.0 Housing Finance III - Project aims to To be determined. Preparation postponed. .elier (CIH) and (Bank) improve housing conditions in low income mnercial Banks communities, further develop the housing be determined) -- sector, and encourage commercial banks to participate in mortgage lending in the context of the reform of the financial sector. Environmental Assessment Category: To Be Determined. - 114 - Member Country, Amount & Implementing Probable Stage of Processing Agency Lender Project s Consulting Services Action on Procuremei MOROCCO (Cont'd) CNCA/Other Banks 100.0 (R) National Rural Finance - Project Consultant services are IEPS issued. Projet (Bank) will provide line of credit and required in WID preparation under w; assistance to Credit Agricole of Morocco activities, banking Pre-appraisal missi( (CNCA) to: (a) develop the sustainable training, institutional scheduled for Octobi foundations of a high quality and building,-and crop,- 1992. competitive intermediary within a insurance. (Cofinancing meetin progressively liberalized financial scheduled for July system in the country; and (b) support 1992.) rurallagro-industry investments by the private sector. Environmental Assessment Category B. Office National de .100.0 Fifth Water Supply - Urgent To be determined. Appraisal mission l'Eau Potable (Bank) rehabilitation and reinforcement works, completed in April (ONEP) and Regies social connections studies, technical Appraisal report un assistance and training. Improvement of preparation. hydrologic and meteorologic data gathering and analysis, and a sanitary education campaign. Environmental Assessment Category B. I Ministry of 175.0 Second Large Scale Irrigation - Consultants to be Project appraisal Agriculture (Bank) Will complete the infrastructure rehabil recruited. completed. Draft s itation and management restructuring of appraisal report un the Regional Offices for Agricultural preparation. Development. Environmental Assessment Category B. Ministry of About (R) Municipal Finance I - Project aims To be determined. Project preparatior Interior/Fonds 150.0 to improve urban infrastructure, and advanced. Appraise d'Equipment (Bank) continue improving local management and mission scheduled J Communal intergovernmental finance. October/November 1 Environmental Assessment Category B. TUNISIA Ministry of 50.0 Secondary Education - Quality and To be determined. Identification mis. Education (Bank) efficiency improvements in general scheduled for FY93 secondary education. Environmental Assessment Category: To Be Determined. Ministry of 80.0 Agricultural Sector Investment (ASIL) - Consulting services for Identification mis Agriculture (Bank) Would support policy reforms in four key agro-industry component. the field. areas: (a) irrigation and water use efficiency; (b) natural resources; (c) marketing/agroindustry; and (d) land tenure. Would also finance priority investments in the budget of the Ministry of Agriculture in these same areas. Environmental Assessment Category B. Ministry of. 70.0 (R) Second Forestry Development - To be determined. Preparation under Agriculture (Bank) Project would improve quality and FAO/CP. Final mis quantity of wood production, reduce soil completed for May erosion and preserve wildlife through: Appraisal report n (a) forest management: (b) forest preparation, expec plantation; (c) pilot forestry projects; completion August (d) forest pasture and range improvement; .(e) nature conservation and development of Ichkeul Park; and (f) institutional development. Environmental Assessment Category B. -115- ember Country, Amount & mplementing Probable Stage of Processing and 1gency Lender 2 Project Consulting Services Action on Procurement I iJNISIA Cont'd) inistry of 25.0 (R) Northwest Rural Poverty To be determined. FAO/CP identification/ griculture (Bank) Alleviation - In addition to preparation mission consolidating the main infrastructure reports received. Bank components, objectives would be to: preparation mission (a) alleviate poverty of rural areas in scheduled for end June undeveloped northwest region . 1992. (b) promote women in development as women contribute significantly to region's agricultural output. (c) increase the rural population's income and employment opportunities; and (d) improve the environment through soil and water conservation and erosion control. Environmental Assessment Category B. nistere de 65.0 National Flood Protection - The project Consultants' terms-of- Preparation under way. fEquipment et de (Bank) would have the following objectives: reference prepared and Habitat (a) developing a national strategy for consultants flood control and protection prequalification carried (b) minimizing flood damages by the out. construction of appropriate infrastructure improving flood control operations and maintenance; and improving cost recovery. Environmental Assessment Category B. nistere de 70.0 Northern Tunisia Water Resource Consultants will be Preparation under way. 'Agriculture (Bank) Mobilization and Management - The required for technical project would improve water resource assistance in water management by addressing existing management. . 7 problems on the efficiency of mobilization, allocation and utilization of water. The project would include physical works for water storage and waste water treatment, and reuse rehabilitation and installation of meters, studies and technical assistance. Environmental Assessment Category A. relopment and 80.0 Industrial Finance - Provide long term Consultants will be Project preparation under nmercial Banks (Bank) financing to industry and enhance required for way. I be determined) competition in Tunisian banking system. institutional Technical assistance envisaged for development of institutional development of participating banks. participating banks. Environmental Assessment Category B. :onal Bank for 50.0 (R) National Rural Finance - The loan Consultants required for IEPS issued. Project *iculture (BNA) (Bank) supports: (a) consolidation and training specialists and preparation under way. expansion of rural banking systems institution building. (Cofinancing from EIB and (credit and savings); (b) development of Kredit Anstalt fur institutional capability of BNA and Wiederaufbau (KfW) diversification of credit operations possible.) into private rural non-farm and export promotion activities. Environmental Retroactive financing of Assessment Category B. up to 10% is planned. - 116 - Member Country, Amount & Implementing Probable Stage of Processing Agency Lender 2 Project Consulting Services Action on Procureme TUNISIA (Cont'd) Ministeres de 80.0 Highway Sector - The scope of this Consultants required for Project preparation l'Equipement et de (Bank) project has been broadened to include technical assistance and way. l'Habitat/ improvement, rehabilitation and implementation. Transports/ maintenance of priority sections of Agriculture trunk and urban roads to better support sectoral strategy and to respond better to economic needs. Environmental Assessment Category B. Ministeres des 80.0 (R) Transport Sector - Project would: Consultants required for Further preparatior Transports and de (Bank) (a) increase productivity promote sub-sectoral expertise awaiting Government 1'Equipement/ modernization and rehabilitation in and technical assistance clearance. l'Habitat railways, ports and airports; and to Ministry of (Possible financing (b) improve road transport organization Transport. the Global Environ through deregulation, road safety Facility (GEF) -- i measures, and road user charge Annex C.) adjustments. Environmental Assessment Category B. Ministry of 75.0 Municipal Sector .Investment - Consultants required for Negotiations Interior (Bank) Improvement of municipal finance and technical assistance substantially comp: management, and municipal infrastructure component. Board presentation investments. Environmental Assessment scheduled for June Category B. 1992. YEMEN, REPUBLIC OF Ministry of 15.0 Livestock Development - Increasing To be determined. Identification mis Agriculture and (IDA) productivity of indigenous livestock scheduled for July Water Resources through broad actions to improve quality and output centered on: (a) selective upgrading of breeding stock, rehabilitation of rangelands and expanding forage and feedstuffs production; (b) developing extension and veterinary services; and (c) modernizing processing facilities. Environmental Assessment Category B. Ministry of About (R) Basic Education - Likely to include: Consulting services Negotiations compl Education 20.0 (a) access to disadvantaged ,groups, will be required. Board presentatior (IDA) especially girls in rural areas; and scheduled for Jul) (b) improvement in quality of education through teacher training and curriculum, textbooks, and achievement test development. Environmental Assessment Category C. - 117 - nber Country, Amount & flementing Probable Stage of Processing and ancy I Lender Project Consulting Services Action on Procurement 4 'El. REPUBLIC OF ')nt'd) xistry of About (R) National Land and Water Conservation Consultant services will Approved by the Executive :iculture and 33.0 First - Focus on improving efficiency of be required. Directors on May 28, :er Resources (IDA) irrigation and forestry sub-sectors. 1992. Credit was signed Environmental effects would be positive on June 19, 1992. because of water management, forestry (Cofinancing will be and soil conservation components. required). Environmental Assessment Category D. eni General About Energy/Power - As a result of the Consultants will.be Project preparation under ctricity 10.3 unification of People's Democratic required to supervise way. poration (YGEC) (IDA) Republic of Yemen and Yemen Arab construction. (Cofinancing will be Republic, the ,project content is being required). revised. The current tentative scope consists of urban rehabilitation, line loss reduction and technical assistance components. No negative environmental or social impacts are expected. Environmental Assessment Category B. tonal Water and About Taiz Water Supply and Sewerage System Consulting services for Project preparation under Ltation 30.0 Rehabilitation and Reinforcement - feasibility studies and way. Pre-appraisal aority (IDA) Rehabilitation and reinforcement of the master plans including mission completed. water utility NWSA and water production technical assistance and Project Preparation and distribution facilities and training. Facility advance of extension of sewerage system to improve US$1.5 million approved water supply and sewerage services in to finance: Taiz. Issues: water resources (a) feasibility study and management, cost recovery, technical master plan; (b) water assistance and training. Environmental resource exploratory Assessment Category B. drilling (ongoing); and (c) equipment for measurement and leak detection. - 118 - Member Country, Amount & Implementing Probable Stage of Processi Agency Lender 2 Project Consulting Services Action on Procure VI. SOUTH ASIA REGION BANGLADESH Bangladesh Power 80.0 East/West Interconnector - Project would Engineering design being Project preparati Development Board (IDA) provide for the second power prepared by consultants. way. transmission interconnection between East and West zones, and would also strengthen the transmission system in the West Zone. The interconnection would be constructed on the Jamuna River and would be used to transmit electricity generated using indigenous- gas in the East zone to the West zone to substitute for electricity generated using imported liquid fuel oil: Environmental Assessment Category B. Ministry of Jute 150.0 Jute Sector Adjustment - Restructure Consulting services will Appraisal missior (IDA) jute manufacturing industry by be required for project scheduled for sec downsizing capacity, retrenching excess preparation and quarter of FY93. labor, closing uneconomical mills, implementation. improving management, privatization and financial restructuring. Environmental Assessment Category: To Be Determined. Ministry of 100.0 (R) Second Industrial Sector Consulting services will Negotiations coml Finance (NBR), (IDA) Adjustment - Would support further be required for Board presentatic Commerce, liberalization of quantitative institution building in scheduled for Jul Industries restrictions on imports, the structure the areas of tariff 1992. of tariff rates, export incentives and analysis, investment investment regulatory procedures and promotion and export incentives to facilitate private sector development. development. Environmental Assessment Category C. Ministry of 50.0 (R) Female Secondary School Assistance - To be determined. Appraisal missiot Education (IDA) Project will involve: (a) enhancement scheduled for Jut of educational opportunities for girls 1992. through the provision of stipends and (Cofinancing into scholarships in Grades 6-12; expressed by UNDI (b) occupational skills development Norway, EEC and ( program; and (c) a public information Japanese T.A. Gr; program. Environmental Assessment Facility agreemei Category C. been signed.) Ministry of Health 65.0 (R) Nutrition - Strengthening of To be determined. Preparation unde and Family and (IDA) Government and NGO coordination of (Cofinancing to I Welfare nutrition activities through support determined.) for: (a) the development and implementation of community-based nutrition programs; and,(b) policy- oriented nutrition research programs. Environmental Assessment Category C. Ministry of 25.0 (R) Technical Assistance VI - Line of Consulting services will Negotiations com] Finance (IDA) credit for financing of feasibility be required during Approved by the : studies that may lend to investment implementation for Directors on Jun projects for training and technical project preparation and 1992. assistance activities to strengthen the institutional borrower's institution and planning development. capacity. Environmental Assessment Category C. - 119 - er Country, - Amount & ementing ,Stage of Processing and my I Lender Project Consulting Services Action on Procurement 4 tAXESH 'd) ;try of 40.0 (R) Agricultural Research III - Would Consulting services will Project under ce (IDA) improve the.relevancy of research output be required to assist preparation. through support to institutionalladmini- with preparation and strative restructuring; supplementary implementation. infrastructure, equipment and staff training; research initiatives with private sector; and contract research funding. Environmental Assessment - Category B. determined 90.0 Power Sector Investment - Will follow up To be determined. Project is in early (IDA) initiatives under previous credit stages of preparation. (ESAC - Cr. 1999-ED), and other sector work activities. Project may also finance a time-slice of Bangladesh Power and Development's investment program. Environmental Assessment Category: To Be Determined. cry of 150.0 Financial Sector II - Would focus on To be determined. Project preparation is in (IDA) further liberalization of interest early stages. rates, refining policies for loan reclassification and provisions for bad debts, privatization of one or more commercial banks, commercial bank management reforms and capital market reforms. Environmental Assessment Category C. ry of 54.6 (R) Forest Resources Management - The To be determined. Negotiations completed. nment and CIDA) project would support: (a) extension of Approved by the Executive mangrove plantations, industrial/energy Directors on June 18, plantations and preparation and 1992. implementation of forest.management plans for all 'established plantations and natural forests; (b) investment and planning support for nature conservation areas; and (c) institutional support to the Forest Department, including establishment of an environmental management unit. Environmental Assessment Category B. Lesh Water 50.0 (R) River Bank Protection - Would Consultants have been Pre-appraisal completed. ment Board (IDA) improve protection against damage caused recruited for Appraisal mission by normal bank erosion hazards at preparation within' scheduled for June 30, selected sites (primarily towns and ongoing studies. 1992. major infrastructure), along the (Cofinancing needs Brahmaputra.and Meghna rivers by anticipated.) construction of sustainable bank protection and river training works, including repairs or retirement of existing flood control embankments at said locations. Would be subiect to limited environmental assessments. Environmental Assessment Category B. -120- Member Country, Amount & Implementing Probable Stage of ProcessinE Agency ' Lender 2 Project 3 Consulting Services Action on Procureme BANGLADESH (Cont'd) Bangladesh Water 41.0 (R) Coastal Embankment Rehabilitation - EEC supported Pre-appraisal missi Development Board (IDA) Would ensure improved protection of consultants have been completed. Apprais (BWDB), Roads and reclaimed coastal agricultural lands recruited for project mission scheduled I Highways Dept. against tidal inundation and seasonal to preparation. June 30, 1992. (RHD) medium cyclone tidal surges by repair and upgrading of sea embankments (and their appurtenant structures) by appropriate structural and biological protection measures. The project would also improve evacuation and relief access by construction of several hundred km of all-weather economically justifiable feeder roads. Environmental Assessment Category B. Roads and Highways 75.0 (R) Second Road Rehabilitation and Pre-investment study has Project preparatic Department (IDA) Maintenance - Rehabilitation or been completed for way. reconstruction of about 200 km of roads, rehabilitation periodic maintenance works on about components and is under 400 km of other major roads in the way for new northwest and southwest and construction construction. of about 50 km of new roads; continued implementation of the action plan for improved road maintenance; and implementation of an action plan to strengthen the construction industry. Total project cost US$126.0 million. No significant environmental impact anticipated. Environmental Assessment Category A. Dhaka Water Supply 50.0 Fourth Dhaka Water/Sanitation - Project Consultants feasibility Project requires i and Sewerage (IDA) now being re-identified but likely to study (funded by identification ba; Authority (DWASA) include: (a) development of long term Government of France) to. results of feisib. water source for Dhaka (including ground prepare.medium/long-term study, which is ul and surface water); (b) rehabilitation investment program for way. and extension of water distribution and DWASA to be completed (Cofinancing inte: sewerage systems; (c) extension of water April 30, 1992. expressed by Japai and low-cost sanitation program; and Development Bank, (d) further institutional development of French Government DWASA. Total cost of first phase of investment program is estimated at US$85.0 million. Positive environmental impact through improved sanitation facilities and rehabilitation of sewage collection treatment works. Environmental Assessment Category B. 1-I - 121- ber Country, Amount & lementing; Probable Stage of Processing,and 1ncy ' - Lender Project ' Consulting Services Action on Procurement ILADESH 'nt d) ttagong Water- 20.0 Chittagong Water Supply and Sanitation Recruitment of water Appraisal report under ply & Sewerage .(IDA) . III - Objectives are to assist CWSSA to -supply and sewerage preparation. 'ority (CWSSA) become a more efficient and effective design/supervision , institution through rehabilitation/ consultants by CWSSA optimization of -existing facilities and will commence in May improved technical, financial, 1992. managerial and administrative capabilities. Project has been revised and now includes an institutional reform program to improve CWSSA's financial and operational performance, efforts to reduce unaccounted for water, limited expansion of the water production facilities, extensive rehabilitation of water distribution system, and technical assistance and training. Positive environmental impact by improved sanitation across income groups and by treatment of domestic, commercial and industrial waste water. Environmental Assessment Category B. na 150.0 Jamuna Multipurpose-Bridge - Consultants will be Appraisal mission to-be .purpose (IDA) Construction of a major multi-purpose required for project scheduled. ge Authority (road-energy telecommunications bridge management and civil (Cofinancing from ADB for across the Jamuna (Brahmaputra) River to works supervision. US$150.0 million; and reduce transport costs and support the Japan). Northwest's economic integration with the rest of the country. Total project Procurement: Civil works cost estimated at US$528.0 million. components to be financed Supplementary Environmental studies by IDA, and co- under way. Some involuntary financiers. Pre- resettlement will be required. qualification completed. Environmental Assessment Category A. Bidding documents completed. adesh Power 136.0 (R) Power Rehabilitation (formerly Power Consultants will be Board presentation opment Board (IDA) Rehabilitation and Distribution) - required for project scheduled for January 18, Project includes: rehabilitation of implementation. 1994. selected power plants, grid substations - and transmission lines to restore rated - generating capacity/extend plant life and improve system efficiency/reliability of supply; and installation of capacitors in selected areas of distribution system to reduce losses/improve voltage. Environmental Assessment Category B. 100.0 (R) Gas Infrastructure - (a) integration Experts on gas network Pre-appraisal mission (IDA) of gas grid (Bakhrabad-Ashuganj analysis, pipeline scheduled for July 1992. pipeline); (b) grid control and engineering and operations safety systems; and environmental safety (c) technical assistance in gas network covered by Japanese management. Environmental Assessment Grant Facility.. Category A. - 122 - Member Country, Amount & Implementing Probable Stage of Processing Agency Lender Project 3 Consulting Services Action on Procuremen BHUTAN Forest Department 5.0 (R) Third Forestry - To support To be determined. Appraisal report undi (IDA) environmental protection and management, preparation. and improve the sustainability of (Cofinancing from SDI natural resource use through collaboration with I] afforestation of vulnerable roadsides, possible.) management and protection of forest and grassland areas, and management and restocking of forest areas designated to supply urban, industrial and institutional needs. Environmental Assessment Category B. INDIA Ministry of Health 150.0 (N) Blindness Control - The project To be determined. Identification undex (IDA) would reduce cataract blindness by raising ophthalmic surgical capabilities in fixed facilities and camps, while promoting public awareness. Environmental Assessment Category C. Departments of 150.0 (N).Population IX - Support of family Expatriate consulting Identification undei Health & Family (IDA) welfare program in the states of services will not be' Welfare (states of Rajasthan and Assam. Components to required. Rajasthan and include service delivery, civil works, Assam) communications, and program management. Environmental Assessment Category C. Forest Department 125.0 AP Forestry - Development of statewide Consulting services will First preparation m Andhra Pradesh . (IDA) forestry project in Andhra Pradesh which be provided by a Dutch is scheduled for Ju will comprise institutional reform, firm using Dutch Trust 1992. plantation development, national forest Funds. management, wildlife conservation and biodiversity. Environmental Assessment Category B. National Power 300.0 (R) NPTC Power System - The princIpal To be determined. Appraisal mission Transmission (Bank) objectives would be to: (a) rationalize currently in the fi Corporation (NPTC) the organization of the transmission sector and promote coordination and inter-regional and inter-state power trading through regulatory, tariff and institutional reforms; (b) help improve financial viability and commercial discipline of state electricity boards; and (c) support NPTC in implementation of its least cost investment. Environmental Assessment Category A. To be determined 200.0 Gas Infrastructure Development - Oil and To be determined. Project is in earl, (Bank) gas distribution infrastructure or coal . of preparation. mining rehabilitation/development to promote efficient production and distribution of fuels and/or restructuring of coal industry. Environmental Assessment Category B. - 123 - iber Country, Amount & lementing Probable Stage of Processing and tney Lender 2 Project ' Consulting Services Action on Procurement IA ntid) errnent of, 25.0 Kerala Urban - Project seeks.to improve To be determined. Pre-appraisal mission ala, KUDP (Bank)/ urban financing, management, and scheduled for October ject Management 75.0 efficient resource utilization in 1992. t (IDA) provision of urban services. Will also focus on improvements in finance, traffic and transport, water supply, and sanitation and environmental improvements. Environmental Assessment Category: To Be Determined. :ral Water 100.0 National Water Management 11/0 & M - To be determined. Draft IEPS is scheduled tission/State (IDA) Second phase of project to improve water for March 15, 1993. irtments of control and delivering on existing 1.gation irrigation schemes. Project would extend improvements to additional states. Environmental Assessment Category: To Be Determined. onal 300.0 NHPC Baglihar Hydroelectric - The To be determined. Project is in pre- oelectric (Bank) project aims to increase hydroelectric feasibility stage. r Corporation generation in the northern region, C) improve maintenance of NHPC's hydro plants, and prepare feasibility studies for potential hydroelectric plants. It comprises: a 450 MW hydroplant at Baglihar; upgrading of existing NHPC hydro plants; and training in maintenance and project management and feasibility studies. Environmental . Assessment Category A. determined 300.0 Power - SEB Restructuring - Promotes To be determined. Project is in its early (Bank) major changes in the structure and stage of preparation.' operations of a group of state electrical boards. Environmental Assessment Category C. r Sarovar 225.0 (R) Sardar Sarovar Canals II - Project To be determined. IEPS issued December Ida Nigam, (Bank) provides funding for construction of 1991. Further Bank (Government 150.0 water delivery and drainage works of the processing awaits jarat) (IDA) ongoing 1.9 m'ha Sardar Sarovar Project completion of the Morse (SSP). Its components include: canals, Team review of SSP's drainage networks and minor network ongoing resettlement and blocks; canal hydro generation and pump rehabilitation and plants; canal operations control and environmental components communication equipment; relocation and under Cr. 1552/Ln. 2497- resettlement of area people;,and IN (Dam and Power) and training and technical assistance. Cr. 1553-IN (Water Environmental Assessment Category A. Delivery and Drainage). ad Natural 300.0 Oil and Gas Development II - The primary To be determined. Project is in the ommission - (Bank) objective would be to provide technical preparation stage. and financial support to ONGC for speeding up the development of its oilfields with the help of joint ventures. The second objective would be to assist the Government in the implementation of further reforms in the oil and gas sectors that would give commercial considerations more weight in the decisions taken in these sectors. Environmental Assessment Category A. - 124 - Member Country, Amount & Implementing Probable Stage of Processing Agency Lender Project ' Consulting Services Action on Procuremen INDIA (Contd) Governments of 100.0 (R) Agriculture Development IV - Project To be determined. Project is in pre- Assam and Madhya (IDA) assist state government (not yet feasibility stage. Pradesh identified) in policy reforms and scheduled for Februa investments in priority subsectors. 1994. Environmental Assessment Category: To Be Determined. Ministry of 92.0 (R) Rubber - Project would expand rubber To be determined. Board presentation Commerce, Rubber (IDA) sector through: (a) replanting of old scheduled for June 3 Board, Government low yielding rubber (40,000 ha); (b) new 1992. of India rubber plantings (30,000 ha); (c) productivity enhancement on existing rubber small holdings (60,000 ha); (d) support for establishment of new rubber processing factories; and (e) institutional support for the rubber board including research, training, women and tribal development and extension, monitoring and evaluation. Environmental Assessment Categaorv B. To be determined 400.0 (R) National Renewal Fund - Assistance To be determined. Appraisal mission (IDA) for strengthening social safety nets scheduled for July/ related to the potential consequence of August 1992. adjustment. Environmental Assessment Category C. Department of 125.0 (R) ICDS III (formerly Nutrition III) - To be determined. Project not yet Women Welfare and (IDA) Project will further strengthen identified. Child Development, integrated child development services. Ministry of Human Environmental Assessment Category C. Resource Development Directorate 130.0 (R) Leprosy Control - Project would To be determined. Appraisal mission General of Health (IDA) develop a leprosy control intervention scheduled for Octob Service Ministry in selected districts targeting an 1992. of Health & Family expected caseload of 1.5 million Welfare individuals. Would also provide for multi-drug therapy, health education, training, infrastructure, disability care, and support to information. Environmental Assessment Category C. Ministry of 400.0 Trade Adjustment I - This is a policy Consulting services will Pre-appraisal missi Finance (Bank) based operation which aims at supporting be required. scheduled for Septe India's trade liberalization policy. 1992. Environmental Assessment Category NIA. Nodal agency not 300.0 Public Enterprises/Private Sector Consulting services will Dialogue is contim yet determined (Bank) Development I - To support the be required for the enabling polic] Government's efforts at reform of restructuring planning. environment. central public sector enterprises Restructuring stud (CPEs). The enabling policy environment currently under wal seeks to induce greater efficiency in number of selected CPEs through inter alia divestiture and elimination of budgetary supports.. The project will include adjustment actions at the enterprise level, including restructuring, workouts, divestitures, etc. Environmental Assessment Category - 125 - Member Country, Amount & Implementing Probable Stage of-Processing. and Agency Lender Project ' Consulting Services Action on Procurement IDIA (Cont,d) National Thermal 400.0 (R) NTPC Power Generation - Principal To be determined. Pre-appraisal mission in Power Corporation (Bank) objectives would be to: (a) improve the field. (NTPC) state electricity boards financial viability and commercial discipline; (b) assist NTPC in meeting its targets for system expansion; (c) support NTPC in the implementation of its least cost investment program; and (d) improve NTPC's operational efficiency and strengthen its environmental management capability. Environmental Assessment Category A. Iaharashtra State 350.0 (R) Maharashtra Power II - Seventh unit To be determined. Board presentation 7lectricity Board (Bank) (500 MW) of Chandrapur (a mine-mouth, scheduled for June 23, (MSEB)/Government coal-based power station), and a 735 km 1992. of Maharashtra EVDC transmission line to improve the reliability and efficiency of the state supply system, and to bring forward institutional and policy reforms in Maharashtra, including a larger private sector role in power. Environmental Assessment Category A. tate Department 25.0 (R) Water Resources Consolidation - To To be determined. Preparation assistance f Irrigation (Bank)/ support a state level investment program mission visited Haryama & aryana & Orissa 125.0 to improve performance of irrigation and Orissa in February 1992. tates) (IDA) expand irrigation and drainage; improve Second preparation operations and maintenance; complete and assistance mission in the rehabilitate irrigation schemes; and field. reform sector institutions. (Projects for each state Environmental Assessment Category: To are in early stages of Be Determined. preparation.) avernment of 100.0 UP Sodic - Project would reclaim about To be determined. Project appraisal planned ttar Pradesh (IDA) 65,000 ha of sodic land in about 10* in November 1992. districts, focusing mainly on privately owned lands to bring them to double- Procurement: To be cropped irrigated arable production, and determined. tree and pasture development on about 4,000 ha of community land. It would assist pilot programs in developing alternative cropping systems based on fruit trees and aromatic plant cultivation. It would provide institutional support to the project implementing agencies. Environmental Assessment Category B. vernment of 121.0 (R) Bihar Plateau - Project would To be determined. The project has been bar (IDA) strengthen GOB's development planning prepared by the and evaluation capabilities, identify Government of Bihar with and support the development of minor Bank support. Appraisal irrigation for increased agricultural completed. production in mostly tribal areas, improve village water supply and rural Procurement; To be roads, and involve local NGOs in the determined. selection of beneficiary activities and assist in their implementation. The project would also create employment opportunities for women. Environmental Assessment Category B. - 126 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project Consulting Services Action on Procurement INDIA (Cont'd) Govt. of Karnataka 100.0 (R) ADP - Karnataka - Project will To be determined. Project under and Rajasthan (IDA) assist the Government of Karnataka in preparation. Appraisal policy reforms and investments in, mission scheduled for priority subsectors. Environmental November 1992. Assessment Category B. Department of About (R) Karnataka Rural Water Supply & Consultants have been Appraisal mission Rural Development, 125.0 Environmental Sanitation - Would improve recruited. scheduled for October Government of (IDA) health and productivity in rural areas 1992. India through provision of rural water supply, environmental sanitation and health education services in Karnataka. Project would focus on improving environmental sanitation. Environmental Assessment Category B. Ministry of 200.0 Port Modernization - Project will focus To be determined. Draft preparatory study Surface Transport (Bank) on .port modernization and productivity received. Final report improvements with no major new expected end July 1992. construction works. Environmental (Trust funding obtained Assessment Category B. for review of ship wast disposal and requirements, oil pollution contingency planning situation, an hazardous material handling in ports.) Ministry of 80.0 Industrial Pollution Control II -*Set up To be determined. Informal discussions Environment & . (Bank) toxic and hazardous industrial waste being held in context < Forests 30.0 minimization program. Other objectives first project. Formal (IDA) include: (a) promoting effective and request yet-to be made timely application of environmental Government of legislation regarding the generation, India/Ministry of disposal and release of toxic and Environment and Foresti hazardous materials; (b) supporting (GOI/MOEF). efforts by industry to prevent generation or encourage recycle of hazardous materials or to properly treat and dispose of toxic substances; and - (c) promoting development and application of novel techniques for minimization of toxic and hazardous waste material. Project will continue the program of support to the development of the enforcement and-. monitoring institutions initiated:in the Industrial Pollution Control Project. Environmental Assessment Category D. - 127 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project ' Consulting Services Action on Procurement INDIA (Cont'd) Irrigation 50.0 Subernarekha Multi-Purpose II (Bihar) - To be determined. Further project Department, (IDA)/ A follow-up project to complete dam and processing contingent Government of 100.0 canal construction; establish irrigation upon tangible proof of Bihar (Bank) system for about 160,000 ha, support on satisfactory farm development activities, provide implementation of agricultural support services, improve resettlement plans. environmental protection, support some resettlement and rehabilitation activities for displaced families as a result of dam and canal construction, supply water for municipality and industrial use and generate hydropower for industrial use. An environmental impact assessment is under preparation. Environmental Assessment Category A. Ministry of 300.0 (R) Railways Productivity Improvement - Consultants expected to Negotiations postponed Railways, (Bank) The project would support the efforts of be used for management until further notice. Government of Indian Railways to accelerate intro- accounting. pending Government India duction and dissemination of more 'cost- decisions on key sectoral efficient and less polluting locomotives issues. and modern higher capacity freight wagons and coaches and to improve the efficiency of their production, maintenance and operation. Environmental Assessment Category B. Department of Non- 145.0 (R) Renewable Energy Development - Consultants will be Appraisal mission Conventional (IDA) Construction of about 45 mini hydro *retained to assist in scheduled for end June Energy Sources; plants (for a total capacity of 110 MW) project preparation. 1992. Indian Renewable on existing irrigation canals, and (Possible financing from Energy Development promotion of other alternative energy the Global Environment Agency; and Tamil development activities. Also, expansion Facility (GEF) -- see Nadu Newsprint and of TNPL's plant for bagasse-based Annex C.) Paper Limited newsprint. Environmental Assessment (TNPL) Category A. Department of 200.0 First Primary Education - Project would No expatriate Pre-appraisal mission Education; (IDA) be implemented in selected districts of consultants required. scheduled for October Ministry of Human Uttar Pradesh and would address issues 1992. Resource of enrollment of girls and quality and Development; efficiency improvement through teacher Department of" training, curriculum improvement, supply Education, of materials, improvements in teacher Government of utilization and low-cost school Uttar Pradesh construction. Estimated project cost US$370 million. Environmental Assessment Category C. Departments of 194.0 (R) Integrated Child Development No expatriate Negotiations completed. Women and Child (IDA) Services II - Project would aim to consultants required. Board presentation Developments; improve health and nutritional status of deferred to FY93. Governments of pre-school children, pregnant women and India and Madhya lactating mothers by means of improved Pradesh; health services, nutritional Department of supplementation and health education Welfare, through the Integrated Child Development Government of Services Program. Environmental thar Assessment Category C. - 128 - Member Country, Amount & Implementing Probable Stage of Processing an Agency ' Lender 2 . Project s Consulting Services Action on Procurement INDIA (Cont'd) Municipal Health 79.0 (R) Family Welfare (Urban Slums) No expatriate Negotiations completed Departments of (IDA) (formerly Population VIII) - Project consultants required. Approved by the Execut Hyderabad, would support strengthening of family Directors on June 18, Calcutta, welfare (family planning and maternal- 1992. Bangalore, child health) services in slum areas of Ahmadabad, Kanpur municipalities through establishment and and other cities staffing of urban health posts and support for training, communication and improved management components under the - family welfare urban revamping scheme. Environmental Assessment Category C. Madras 25.0 Madras Water Supply and Sanitation II - Consultants have been Appraisal misson delay Metropolitan Water (Bank) Project would support major expansion of retained to assist with until the availability Supply and 200.0 water supply and extension and project preparation. water is assured. Sanitation Board (IDA) operational improvements of sewage (Metrowater) collection and disposal. It would also finance an environmental sanitation program and institutional development. Environmental Assessment Category B. Municipal 200.0 (R) Bombay Sewage Disposal - Would Expatriate consultants Preparation mission Corporation of (Bank) finance construction of two 3-km marine have been retained to presently in the fiel Greater Bombay outfalls and two aerated lagoons. assist with project Technical assistance would be included preparation. for construction supervision. Total project cost estimated at US$120.0 million. Environmental Assessment Category A. Industrial 400.0 Financial Sector Adjustment I - Loan to To be determined. Awaiting details of Development Bank (Bank) strengthen the financial system by Government's financia of India (IDBI); freeing entry into the commercial sectorreform program Industrial Credit banking sector, deregulating interest and Investment rates, lowering reserve requirements and Corporation of priority sector lending targets, and India (ICICI); and improving prudential guidelines to Industrial Finance ensure future health, autonomy and Corporation of competition within the sector. India (IFCI) Environmental Assessment Category C. Ministry of Water 100.0 (R) Narmada River Basin Development - Studies on environmental Project documents hav Resource (IDA) Assistance for catchment treatment in issues and water been drafted. Furthe (Narmada Control the Sardar Sarovar Project catchment modelling. Also, Bank processing await Authority), State area, in Madhya Pradesh (M.P.); and in technical assistance for the Morse Team revieu Governments of the middle Narmada basin. Assistance fisheries and SSP's ongoing Madya Pradesh, for fisheries development in the Sardar participatory rural resettlement and Gujarat and Sarovar reservoir, in the Narmada appraisal techniques. rehabilitation and Maharashtra estuary, and the Sardar Sarovar command environmental compone area. A village development fund to and the Bank's decisi support resettlement assistance for on subsequent project management of wildlife sanctuaries in processing steps. Gujarat. Technical assistance for training and basin wide environmental management. Environmental Assessment, Category D. - 129 - ember Country, Amount & aplementing Probable Stage of Processing and gency - Lender Project Consulting Services Action on Procurement 4 NDIA Cont,d) vernment of About Subernarekha (Orissa) Irrigation - To . To be determined. Appraisal contingent upon Iissa, Department 155.0 develop a new irrigation system for reaching agreement on F Irrigation (Bank) about 100,000 ha including the - seasonal distribution of 125.0 construction of three buffer reservoirs, water between Orissa and (IDA) major and distributory canals, field Bihar and tangible proof channels, on-farm development and to of implementation of provide additional agricultural support resettlement plans. services, improved irrigation water management, and environmental protection works. An environmental impact assessment'has been prepared. Environmental Assessment Category A. vernment of West About (R) Kangsabati Irrigation Study by water Government disagrees with ngal, Department 30.0 Modernization - To rehabilitate and management (Plan of FAO conclusion that Irrigation (Bank) / upgrade an existing irrigation system of Operations and proposed 3-small dams are 60.0 up to 340,000 ha by construction of Maintenance) consultants not feasible and propose (IDA) works including an additional spillway is targeted for reformulation. FAO is .and related enhancement of storage completion at end of reviewing reformulation utilization of Kangsabati Dam, lining of June 1992. proposal and will include the canal system and providing improved the Plan of Operations water operations management and on-farm and Maintenance (POM) development, construction of diversion study results when weirs for reuse of return flows; completed. Government's development of drainage and potential confirmation of steps groundwater (conjunctive use), taken to conclude the facilities; and provision of above and other issues agricultural support services, training are awaited prior to a and implementation support. Limited Bank mission to assess environmental impact. Environmental situation. Assessment Category B. ernment of 250.0 Nabard Agricultural Rural - Support for To be determined. Dependent on financial liia, NABARD (Bank) Agriculture Credit. The project would . sector reform adjustment supplement GOI resources for agriculture program. Timetable for lending. Project objectives would further processing still include identification and unknown. implementation of appropriate reforms now required to revitalize agriculture lending and to make it more sustainable and effective; it would also contribute to the production needs of women and to poverty alleviation. Environmental Assessment Category B. tistry of 153.0 (R) National Highways II - To modernize The participating states Approved by the Executive face Transport (Bank) about 290 km of National Highways in six are employing Directors on May 12, ST) 153.0 states; to increase road construction consultants for project 1992. Date of signing (IDA) capacity and promote technology transfer preparation. being arranged with and skill development; to promote Ministry of Surface institutional improvements, and; Transport. reconstruction of six bridges in Orissa has been included. -The project has environmental benefits and one - potentially adverse impact (unstructured development that may be induced by road works). Environmental Assessment Category B. - 130 - Member Country, Amount & Implementing Probable Stage of Processing Agency Lender Project 3 Consulting Services Action on Procureme INDIA (Cont,d) Ministry of 250.0 Industrial Energy Conservation - To Consultant may be Due to delays in pr Energy, Department (Bank) formulate plans for energy conservation required to: processing reapprai of Power in selected industries; to establish (a) establish database; 'take place. Reappr mechanisms and institutions needed to (b) conduct subsector -tentatively schedul identify and implement the sub-projects, energy surveys; early FY93. to improve efficiency of processes (c) design a tax/subsidy including substitution of petroleum- scheme; (d) identify based fuels by other sources of energy; barriers to and suggest and to minimize dependence on unreliable measures to encourage supplies of power, etc. Project will energy service have a beneficial impact on the companies; (e) identify environment through reduced specific barriers to and suggest energy consumption, and therefore measures to encourage reduces harmful gas emissions per unit cogeneration projects in of output. Environmental Assessment industry; (f) quantify Category D. training needs; (g) assist in the start- up of the Energy Management Center; (h) assist Bureau of Indian Standards in undertaking a related program; and (i) other institutional support. NEPAL Ministry of 60.0 (N) Public Resource Management - The To be determined. Initial EPS schedul Finance (IDA) project would support Government's July 1992. Prepara institutional and structural reforms in work under way. public resource management. The project would have three components: (a) improving efficiency of public revenue mobilization; (b) improving public expenditure planning, implementation and control; and (c) supporting selected sectoral policies and expenditures on operations and maintenance. Environmental Assessment Category C. Ministry of 16.5 Higher Education - To support ongoing To be determined. Project preparatior Education and (IDA) reform at Tribhuvan University (TU) way. -Culture through enhancing planning and -management capacity, improving physical facilities and means of instructional delivery and assisting TU and the Ministry of Education and Culture in preparing the introduction of higher secondary education. Environmental Assessment Category C. Ministry of 25.0 Rural Water Supply and Sanitation - Consultants (both local Project processing Housing and (IDA) Improvement of rural water supply and and international) are way. Physical Planning sanitation under the new policy currently being guidelines with greater involvement of recruited to finalize user committees and non-governmental project preparation. agencies. Project would involve the rehabilitation of about 300 existing schemes and construction of 70 new ones. Environmental Assessment Category B. - 131 - ,4ember Country, Amount & -Implementing Probable Stage of Processing and 4gency ' Lender 2 Project 3 Consulting Services Action on Procurement 4 SEPAL (Contid) unsari Morang 27.0 Sunsari Morang New Headworks - To Consultants have been Negotiations tentatively ,'rrigation (IDA) address the serious siltation problem retained to assist with scheduled for August )evelopment Board with the ongoing Sunsari Morang detailed design and 1992. Irrigation II project (Credit 1814-NEP). construction supervision The project would: (a) construct a new of the new headworks. intake about 1300 m upstream of the existing intake; (b) increase capacity of existing desilting basin: (c) construct a microhydro unit; (d) supply dredging equipment; (e) undertake institutional strengthening and train project staff; (f) provide technical assistance for detailed design and implementation; and (g) undertake environmental protection activities. Environmental Assessment Category B. Iapartment of 57.0 (R) Road Maintenance - Project includes: Consulting services will ODA and the Swiss Dads (IDA) (a) reorganization of the Department of be required for Development Cooperation Roads; (b) support for a three to four preparation of road have agreed to year road maintenance; (c) rehabilita- maintenance and participate during pre- tion of priority trunk and feeder roads; rehabilitation program, appraisal (scheduled for (d) staff training in management and policy action program February 1993) and execution of road maintenance; and workshop and assessment appraisal missions. (e) technical assistance for planning of road construction A PPF has been granted in and budgeting exercises as well as to industry. The the amount of US$360,000 develop technical capacity for Government has issued to engage consultant engineering design and supervision of letters of invitation services for preparation works proposed. Environmental for consultants activities. Assessment Category B. proposals. (Cofinancing is being explored.) pal 55.0 Telecommunications V - Includes 61,000 To be determined. Approved by the Executive lecommunications (IDA) local telephone lines, rural Directors on May 12, rporation transmission to 26 districts, outside 1992. Signing date to be plant network, main trunk network. determined. Total cost US$120 million of which (Cofinancing from US$100 million in foreign exchange. No FINNIDA, Japan maior environmental impact. International Cooperation Environmental Assessment Category C. g Agency (JICA), and DANIDA and possibly from French and Belgium Governments). aal Electricity 65.0 (R) Power Sector Efficiency - Consists Consulting services will Approved by the Executive hority (IDA) of components aimed at rehabilitation/ be required for project Directors on March 26, upgrading of the Nepal interconnected supervision and 1992. Signing date to be system (generation, transmission and technical assistance. determined. distribution as well as continue Consultants are about to institutional strengthening of the Nepal be retained for Advance Procurement: Electricity Authority (NEA)). Because supervision of the Advance procurement is the proposed project will be primarily Trisuli-Devighat under way for the civil confined to upgrading the efficiency of Hydroelectric upgrading and electro-mechanical the existing system, it is not expected project. components of the to have major environmental impacts; the Trisuli-Devighat Hydro- Marsyangdi Watershed Management Electric Upgrading component would assist in improving Project. environmental management of the Marsyangdi water shed. Environmental Assessment Category B/D. - 132 - Member Country, Amount & Implementing Probable Stage of Processing Agency Lender Project ' Consulting Services Action on Procuremer NEPAL (Cont'd) Department of 40.0 Irrigation Sector - To: (a) construct Consulting services to Project preparation Irrigation (IDA) small and medium farmer managed surface be provided by way. schemes and rehabilitate existing farmer individual consultants managed surface schemes in the Hills and financed under an on- Terai areas; (b) construct farmer-group going UNDP project. managed groundwater schemes an the Terai; (c) institutional development support. Environmental Assessment Category B. Ministry of Health 26.0 (R) Population and Health - To improve To be determined. Appraisal report unt (IDA) health conditions and reduce population preparation. growth by strengthening of family (Japan T.A. Grant planning and maternal child health Facility agreement programs. Environmental Assessment on March'17, 1992.) Category C. Government of 30.0 Financial Institution Development - To Consultants may be New Government has Nepal (IDA) support the formulation and financing of required. More that the project co: industrial development programs of high information on be reviewed/re-appr priority, and to develop a more viable consultant requirements and competitive industrial financing will be known at a later system. Environmental Assessment date. Category B. Nepal Electricity. 115.0 (R) Hydro Power ,(Arun III) - 402 MW run- Consultants have been Project appraisal Authority (IDA) of-river hydropower plant with appointed. tentatively schedul associated transmission facilities and December 1992. institutional strengthening of the Nepal (Cofinancing from A Electricity Authority. Action Plan to Swedish Agency for ameliorate the hydro project's International Techr environmental impacts is under Economic Cooperatic preparation and will be implemented in (BITS), KfW, ODA (t coniunction with this project. OECF, UNDP, Nordic Environmental Assessment Category A. Development Fund, t Governments of BelE Finland and Italy s possibly the Govert of Austria and Frar well as Export Kreditamnden (Swed& Export Credit Agen< PAKISTAN National Cresent 135.0 (N) Karachi Hydrocracker - Project would Consultants have been Preparation missioi Petroleum Limited (Bank) assist in mobilizing resources.for appointed to undertake a completed. Pre-apl (NCPL) cofinancing private sector investments process configuration mission scheduled in development of the refinery review. Review would be September 1992. subsector. Project would also promote: completed prior to (a) efficiency and ensure petroleum initiating bidding products supply while reducing -. process for engineering, environmental pollution; and procurement and (b) institutional strengthening of construction contract. project company. Financing will. be - A pre-qualification provided on a limited recourse basis to notice has been issued a private joint venture company, the to pre-qualify potential National Cresent Petroleum Limited suppliers of critical (NCPL), with responsibility to design, and complex equipment in build, finance, own and operate a accordance with Bank hydrocracker complex in Karachi. NCPL guidelines. would be required to completed an environmental assessment of the hydrocracker complex. Environmental Assessment Category: To Be Determined. - 133 - er Country, Amount & ,ementing Probable Stage of Processing and ICy Lender 2 Project Consulting Services Action on Procurement (STAN It d) e determined About Nutrition - The project objective is to Consultants with- Identification mission 51.5 improve nutritional status, particularly expertise in nutrition, scheduled for July 1992. (IDA) for females and children, in project agroindustry, rural areas; and to build capacity for broader sociology, health interventions in the future. management, and Environmental Assessment Category C., community development will likely be required. ctorate of About (R) NWFP Primary Education - The project Consultants likely to be Identification to begin ary Education, 80.0 will support primary education develop- required. in FY93. rnment of (IDA) ment in the northwest frontier provinces jwest Frontier (NWFP). It will likely support policy Lnces measures and planning management reforms. Environmental Assessment Category C. onment & 80.0 (R) Agriculture Environment/Forestry To be determined. Identification under way. Affairs, (IDA) II - The project consists of three broad tncial components: (a) institutional itry strengthening; (b) social forqstry tments development; and (c) natural resources rehabilitation and protection. Environmental Assessment Category B. determined About (R) Private Sector - To assist the To be determined. Project under 100.0 Government and financial institutions in preparation. (Bank) delivering better instruments for credit delivery to the private sector and to all sectors. Environmental Assessment Category: To Be Determined. torate of About (R) Balochistan Primary Education - Will Consulting services will Pre-appraisal completed. ry Education, 91.0 support primary education development in likely be required for aistan (IDA) Balochistan with particular emphasis on implementation. tment of girls' schooling. Project will likely Lion support policy measures, planning, and management reforms to increase girls' access to schooling. Environmental Assessment Category C. and Power 200.0 Chazi-Barotha Hydropower - Project would Consultants (comprising Project feasibility study pment (Bank) provide for construction of: (a) a a joint venture of 5 completed in May 1991. ity Barrage, on Indus River, about 7 km dis firms) have been working Preparation of detailed of Tarbala dam; (b) a 53 km long single on project preparation designs and tender concrete lined power channel; (6) a since February 1990. documents for civil works power complex with 1450 MW power house is in progress and (5 units of 290 MW each) and associated scheduled to be completed infrastructure facilities including by end 1992. 500 kv circuits. Environmental (Cofinahcing from Japan Assessment Category A. expected, i.e. OECF, EXIM.) determined About (R) Punjab Urban Environment - Arrest Consultants.have begun Preparation being 100.0 decline of urban environment through project preparation. undertaken during 1992 (Bank) hazardous waste control, ground-water and appraisal planned for 31.0 resource protection, public awareness early 1993. (IDA) and EPA strengthening. Project will (Will also include a comprise investments in toxic/hazardous waste-to-energy component waste clean up and processing, by the Global Environment industrial wastewater collection and Facility (GEF) -- see treatment and technical assistance for Annex C.) institutional strengthening. Environmental Assessment Category A. - 134 - Member Country, Amount & Implementing Probable Stage of Process! Agency Lender - Project s Consulting Services Action on Procuro PAKISTAN (Cont-d) Pakistan About (R) Telecommunications Sector Consulting services will Preparation has 1 Telecommunications 150.0 Restructuring - Project would assist in be required for delayed pending < Corporation (PTC) (Bank) the restructuring of telecommunications preparation and on Bank investmez sector including PTC privatization, implementation of the sector. regulatory reform and sector project.- liberalization and support investment aimed at optimizing PTC's telecommunications network and improving network efficiency and quality of services. Environmental Assessment Category C; Departments of About (R) Family Health II - To increase the Consultants likely to be Appraisal under Health, 78.3 availability and quality of maternal required for preparation Balochistan and (IDA) health services including family and implementation. Punjab planning, improve the quality and integration of primary health care services, and strengthen institutional capabilities in Punjab and Balochistan. Environmental Assessment Category C. To be determined About (R) Financial Sector Adjustment II - To be determined. Preparation unde 200.0 Policy loan to support reform program in (Bank) the financial sector. Follow up loan to FSAL I. Environmental Assessment Category C. To be determined About (R) Private Sector Energy Development II To be determined. Project preparai 160.0 - Will focus essentially on suspended pendir (Bank) strengthening Institutions in Pakistan - resolution of ii which will participate in private sector under ongoing pi investments in the energy sector. (Private Sector Environmental Assessment Category B. Development). (Cofinancing ex Donors to be idf Water and Power About (R) Power Sector Development - Consulting services Appraisal missi( Development 200.0 Implementation of a time-slice (FY93-96) will be required. field. Authority (Bank) of WAPDA's least-cost investment (Cofinancing fri program, and restructuring program for Development Ban WAPDA. Would also include a technical OECF, and EXIM assistance component. Environmental committed. Oth, Assessment Category B. cofinanciers ar identified.) Ministry of About Public Sector Adjustment --Would support To be determined. President's rep Finance 100.0 Government's adjustment program, preparation. (Bank) particularly efforts to reduce the role (Cofinancing ex 100.0 of the public sector in the economy. from Japan.) (IDA) Components include privatization of public enterprises, restructuring of public expenditures to provide adequate funding for basic social services and infrastructure, tax reform, and policy reform in the social sectors. Environmental Assessment Category C. - 135 - r Country, Amount & mentins Probable Stage of Processing-and , 1 Lender * - Project Consulting Services Action on Procurement 'd) determined About (R) Integrated Hill Farming II - Project To be determined. Appraisal mission 51.0 will include provision of inputs and- scheduled for October (IDA) support services for increased food and 1992. fodder crop production, strengthening of extension, animal health services.and input distribution, afforestation of demarcated forests and hillside planting for fuelvood, improvement of feeder roads and establish soil conservation works and technical assistance for . project implementition. Environmental Assessment Category B. Department 115.0 (R) Middle Schooling - To improve the Consultants will be Approved by the Executive cation (IDA) quality of the delivery of lower required to assist in Directors on April 14, secondary education in the Punjab school construction 1992. Credit was signed through improved planning, management design and supervision, on June 2', 1992. and administration of schools, administrative reform, supervision, and enhanced educational examination and testing, materials. Environmental Assessment educational book and Category C. . material development production and in school mapping. and Power . About (R) Eastern Sadiqia (South) Phase I - Consultants will be Negotiations completed. ment 54.2 Subsurface and surface drainage, water required for project Board presentation ty, Punjab (IDA) conservation through canal lining, implementation. scheduled for June 30, Lon provision of interceptor drains, and 1992. ent watercourse improvement in the Fordwah/Eastern Sadiqia (South) canal command area in Punjab Province. Phase 1 would include water conservation measures, a monitoring program, and additional preparation work for the subsurface drainage system to be implemented under a separate Phase 2 project. Environmental effect of Phase 1 expected to be positive. Environmental Assessment Category B. lnt of About (R) Environmental Protection and Consultants will be Approved by the Executive a - 33.3 Resource Conservation - Protection and required for project Directors on June 11, nental and (IDA) management of environmental resources in implementation. 1992. IEfairs Pakistan. Positive environmental impact expected. Environmental Assessment Category D. Housing About Low-Income Communities Infrastructure - Consultants have been Appraisal mission ly together 70.0 Area upgrading and basic urban services appointed. scheduled for September pective (IDA) for squatter communities. To facilitate 1992. al mechanisms for land markets and shelter A PPF advance of, nts development in urban and high density US$1.1 million is under rural areas. Land tenure and user fees consideration to provide for services to be addressed. Positive. technical assistance. environmental impact expected. Funds obtained from Japan Environmental Assessment: To Be . and Switzerland for Determined. preparation. (Cofinancing of up to US$10.0 million may be required for implementation.) - 136 - Member Country, Amount & Implementing Probable Stage of Processit Agency Lender Project 3 Consulting Services Action on Procurer PAKISTAN (Cont-d) Government of About (R) Sindh Urban Policy Reform (formerly Consultants have been Appraisal report t Sindh (GOS) 16.0 Policy and Institutional Reform of the appointed. preparation. (IDA) Government of Sindh) - This is the first (U.S. Trade & DevE of five projects included in the Sindh Program (US$500,0( Special Development Program. As part of Japanese Grant Fa an overall fiscal and administrative grants (US$1.8 mil policy and institutional adjustment equivalent) have I program for the Sindh Province, the approved for finai project would include: (a) institution project preparati4 building and adjustment components for the Government of Sindh, and local governments; (b) investments for preparation of engineering studies and final designs for the subsequent investment operations; and (c) a small amount of civil works for pilot demonstrations in key policy areas. Environmental Assessment Category C. Oil and Gas About (R) Domestic Energy Resource Development Consultants will be Board presentatic Development 180.0 - Support of oil and gas development in required for project scheduled for Jun Corporation (OGDC) (Bank) identified joint ventures and corporate implementation. 1992. restructuring of OGDC. Environmental (Cofinancing coni Assessment Category A. with USAID (US$1.7 million), with IDB (US$17.5 million Retroactive finai US$18.0 million i for the cost of < the delineation i consultancy serv February 1991. To be determined About Industry and Trade Adjustment - Consulting services Preparation unde: 200.0 Adjustment loan to promote further required for (Bank) reforms aimed at improving industrial preparation/appraisal. sector efficiency and linkage to agricultural sector and capital markets. Environmental Assessment Category C. SRI LANKA To be determined To be (N) Vocational and Technical Education To be determined. Identification a deter- and Training - Support for training at planned for Octc mined various levels and in different sectors (IDA) to meet the needs of the labor market. Rationalization of technical education. Environmental Assessment Category: To Be Determined. Agroindustry 30.0 (N) Agricultural Diversification - The To be determined. Identification t Technical (IDA) project consists of three components: in FY93. Appral Assistance (a) a line of credit to finance private mission schedulE Foundation enterprise in rural areas; September 1993. (to be created) (b) development of a technical assistance delivery system to meet the needs of the project's financial intermediaries (PFIs) and investors; and (c) a study of the rural private investment environment. Environmental Assessment Category B. - 137 - mber Country, Amount & iplementing Probable Stage of Processing and ency I Lender Project 3 Consulting Services -Action on Procurement ILANKA nt'd) aistry of 100.0 Structural Adjustment - To address broad To be determined. Preparation under way. lance (IDA) policy reform agenda arriving at rehabilitation of private sector, incentives, including liberalization of external and internal trade and restructuring of the vast public enterprise sector. Environmental Assessment Category: To Be Determined. be determined 50.0 General Education II - The project will Consulting services will Project has not yet been (IDA) support the implementation of policy likely be required. identified. An updated reforms and investment programs to make assessment will be the education system more responsive to submitted in 1993. the needs of the labor market. Environmental Assessment Category C. awell Authority 30.0 (R) Mahaweli Rehabilitation - To be determined. FAO/CP preparation Sri Lanka (IDA) Rehabilitation and improvements of mission in the field. 5L) irrigation and drainage facilities, Initial Executive Project institutional restructuring, formation Summary (IEPS) to be of farmers' organizations, and issued early July 1992. introduction of improved operation and maintenance. Environmental Assessment Category: To Be Determined. Development 35.0 Highway Maintenance - Will aim to: Consulting services will Project under preparation ority (RDA) (IDA) (a) strengthen road maintenance be required for by RDA. Project capabilities; (b) address human resource preparation of processing will be and institutional development issues; maintenance program, discussed during June and (c) restructure the local feasibility studies, and, 1992 mission. maintenance contractor industry. Would maintenance A PPF of US$0.3 million also finance: (a) technical assistance; reorganization and may be requested. (b) part of a five year program of management study. (Cofinancing will be periodic maintenance and rehabilitation Consultants for project explored.) program; laboratory tools and preparation to be maintenance works; and (d) training financed under possible components. Environmental Assessment PPF and bilateral Category B. grants. try of 50.0 Private Sector Development - To promote Consulting services will IEPS to be issued late e/Ministry (IDA) the development of the private sector be required for policy June 1992. tdustry through policy and tariff reform, and tariff reform, Lees and provision of term credit and technical institution building and alogy assistance for rehabilitation of enterprise existing enterprises. Project rehabilitation. components will increase the outward orientation of the private sector and enhance its role in the provision of social sciences and infrastructure. Environmental Assessment Category C. -138- Member Country, Amount & Implementing Probable Stage of Processing Agency ' Lender 2 Project Consulting Services Action on Procurement SRI LANKA (Cont-d) Ministry of 20.5 (R) Community Water Supply and Consultants have Negotiations tentati) Housing & (IDA) Sanitation - Strengthen prepared District scheduled for July 11 Construction & planning/programming capability of Development Plans, and Credit documents und( Community Water & Government and local authorities; an institutional preparation. Sanitation develop mechanisms for Government framework, community A PPF for US$0.7 mil. Drainage Program policies on cost recovery and operations mobilization, health has been approved to Unit (CWSPU) and maintenance; develop education, monitoring provide technical responsibilities for operations and - and evaluation, and assistance for proje, maintenance capability in the local training. Final reports preparation. authorities and user groups; to promote were received in involvement of NGOs, the private sector, December 1991. A Retroactive financin women; increase coverage of water and further multi-year US$0.2 million is sanitation in rural and small community consultancy is being proposed. subsector; and improve public health formulated to provide through provision of safe drinking water technical/management and adequate sanitation. Environmental support to CWSPU program Assessment Category B. unit during project implementation. Ministry of 35.0 (R) Local Government Development - Consultants to prepare Project has been rem Finance (IDA) Project will provide technical an initial pipeline of from the Lending Prc assistance and training to 308 rural and projects for the LLDF Further reporting wi urban local authorities (LAs) and have been appointed, and discontinued. technical assistance and a line of consultants to prepare credit to the restructured Local Loans the technical assistance Development Fund (LLDF). Sub-loans and training components would finance LA projects which are not are now being appointed suitable for private investment, e.g., under Credit 1697-CE roads, sidewalks, parks, playgrounds, (Municipal Management drainage, street lighting, municipal Project.) offices, public markets. LLDF would carry out an environmental assessment as part of its appraisal of sub-projects. Environmental Assessment Category B. Ministry of 14.3 (R) Agricultural Extension II - The Consulting services will Approved by the Exe, Agriculture, (IDA) project aims at restructuring be required to implement Directors on June 9 Development and agricultural extension services, the extension component 1992. Credit was s Research developing seed legislation, and and to develop seed on June 17, 1992. streamlining pesticide management. legislation. Total project cost is US$18.3 million. No negative environmental impacts predicted. Environmental Assessment Category B. Ministry of 35.0 Transport I - To include procurement of Consultants were Appraisal mission d Transport/Road (IDA) equipment, spare parts and repairs for appointed. be scheduled. Development railway operations; improvement of Consulting services Authority traffic management in Colombo being financed unda Municipality; and technical assistance IDA Project Prepara for transport planning. Total project Facility advance fc cost US$286.0 million. Environmental total of US$906,OC impact is expected to be positive. (Cofinancing from C Environmental Assessment Category B. US$80.0 million ha approved.) - 139 - VII. NEW PROJECTS ADDED IN THIS ISSUE I. AFRICA REGION COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE BENIN Direction de l'Hydraulique Rural Water Supply 2 B.P. 363 and Sanitation Sector Cotonou, Benin Telex: (979) 5252 Telephone: (229) 31 3437 BURRINA FASO Ministry of Finance SAL II 4 B.P. 7050 Ouagadougou, Burkina Faso Telex: 5555 SEGEGOUV To be determined Urban Environment 4 To be determined Environment Management 4 CAMEROON Ministry of Mines, Energy Sector 6 Water & Energy Yaounde, Cameroon Telephone: (237) 233-404 Ministry of Industry Private Sector 6 Yaounde, Cameroon Development Ministry of Technical Agricultural Research II 6 and Scientific Research Yaounde, Cameroon Telephone: (237) 23-35-38 Ministry of Posts and Second Telecommunications 6 Telecommunications (MPTT) Government of Cameroon B.P. 1614 Yaounde, Cameroon Cable: 231298 Telex: 978-8285 Telephone: (237) 231298 - 140 - I. AFRICA REGION (Cont'd) COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE CAPE VERDE Ministry of Finance Multi-Sector 7 C.P. 30 Praia, Cape Verde Fax: 238-61-38-97 Telex: 6058 Telephone: 238-61-41-42 Ministry of Public Administration C.P. 200 Praia, Cape Verde Telephone: 238-61-27-81 COTE D'IVOIRE MINAGRA Land Tenure 10 B.P. V82 Abidjan, Cote d'Ivoire Telex: 23612 MINAGRA Telephone: (225) 21 85 14 Office of the Prime Minister Telecommunications III 10 01 B.P. 1533 Abidjan 01, Cote d'Ivoire Fax: 217041 Telephone: 22 15 76 THE GAMBIA Ministry of Finance Economic Management SECAL 14 The Quadrangle Bangui, The Gambia To be determined Banjul Port III 14 TANZANIA To be determined Private Sector 35 (Enterprise) Development ZAMBIA Tazama Pipelines, Petroleum Rehabilitation 39 Indeni Refinery and Zimoil Zimco House Cairo Road P.O. Box 30090 Lusaka, Zambia Fax: 227258 Cable: ZIMCO Telex: ZA 40529 GFD Telephone: 227925 AFRICA REGIONAL To be determined Women In Development 41 (WID) -141- II. EAST ASIA & PACIFIC REGION COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE CAMBODIA Ministry of Finance Emergency Rehabilitation 42 Phnom Penh, Cambodia Fax: (873) 1770 102 INDONESIA Bina Marga Kabupaten Roads 50 (Ministry of Public Works) (East Indonesia) J1. Pattimura 20 Main Bldg., 2nd Floor Jakarta, Indonesia Fax: 799-1350 Telex: 62553 PHILIPPINES Department of Health Women's Health and 62 San Lozaro Compound Safe Motherhood Rizal Avenue Manila, Philippines Fax: (632) 711-6050 Telephone: (632) 711-9582 III. EUROPE AND CENTRAL ASIA REGION BULGARIA Ministry of Regional Water and Sanitation (WASL) 68 Development, Housing Policy and Construction 17-19 Kiril i Metodi St. Sofia, Bulgaria 1000 Fax: (35-92) 87-25-17 Cable: 22182/22314 Telephone: (35-92) 83 841 POLAND Polish Power Grid (PPG) Power Sector Restructuring 72 ul. Mysia 2, 00-496 Warsaw, Poland Fax: 48-2-628-5964 Telephone: 48-2-214-904 ROMANIA To be determined Agroprocessing and 73 Marketing Export Ministry of Labor and Employment and Social 73 Social Protection Protection 2 Demetru 1 Popescu Street 70119 Bucharest, Romania Fax: 50-0-157-584 Telex: 11742 Telephone: 40-0-156-564 - 142 - III. EUROPE AND CENTRAL ASIA REGION (Cont'd) COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE ROMANIA (Cont'd) ROMTELECOM First Telecommunications 74 14-16 BD Bucharest 70060 Romania 5 To be determined Petroleum Sector 74 Restructuring To be determined Municipal Development/ 74 Environment TURKEY To be determined Energy Conservation 76 IV. LATIN AMERICA AND CARIBBEAN REGION ARGENTINA To be determined Reform of Provincial Finances 79 BARBADOS Ministry of Finance Structural Adjustment (SAL) 80 and Economic Affairs Government Headquarters Bay Street St. Michael, Barbados Fax: (809) 436-9280 Telephone: (809) 436-6435 BELIZE Belize Electricity Board (BEB) Power Development 81 115 Barrack Road Belize City, Belize Fax: (501) 2 75954 Telex: 310-272 Telephone: (501) 2 76084/ 76050 BRAZIL Federal Railway Export Railway Reform 82 Company (RFFSA) Praca Procoprio Ferreira 86, Rio de Janeiro, Brazil Fax: (55-21) 263-3128 Telephone: (55-21) 233-3945 - 143 - IV. LATIN AMERICA AND CARIBBEAN REGION (Cont'd) COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE CARIBBEAN REGION Caribbean Development - CDB VI 86 Bank (CDB) P.O. Box 408 Fax: (809) 429-7216 Telex: (809) 386-2287 Telephone: (809) 431-1700 DOMINICAN REPUBLIC Corporacion Dominicana Power II 90 de Electricidad Fax: (809) 532-0123 Cable: ANACAONA Telex: 346-4195 EL SALVADOR Ministry of Planning SAL II 91 Casa Presidential San Salvador, El Salvador Fax: (503) 71 56 05 Telex: 301-20809 Telephone: (503) 71 51 41 GUYANA Guyana Water Authority Water Supply 92 Sophia, Georgetown -Technical Assistance Telephone: 53583 and Rehabilitation JAMAICA Ministry of Finance, Trade and Private 95 Development and Planning Sector Development P.O. Box 512 30 Heroes Circle Kingston 4, Jamaica Fax: (809) 922-8804 Telephone: (809) 922-8600 NICARAGUA Fondo de Inversiones Social Investment Fund 99 Social de Emergencia (FISE) (FISE) Apartado Postal 1849 Managua, Nicaragua Fax: (505) 2 673843 Telephone: (505) 2 673076 -144- IV. LATIN AMERICA AND CARIBBEAN REGION (Cont'd) COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE PARAGUAY Corporacion de Obras Sewerage 99 Sanitarias (CORPOSANA) Jose Berges 516 Asuncion, Paraguay Fax: (595) 21-498890 Telephone: (595) 21-498059 PERU To be determined Municipal Development TRINIDAD & TOBAGO To be determined Environment Protection 102 and Forestry To be determined Power Sector Investment 102 To be determined Water Sector Reform 103 V. MIDDLE EAST AND NORTH AFRICA REGION IRAN Ministry of Agriculture/ Irrigation Improvement 110 Ministry of Energy and Water VI. SOUTH ASIA REGION INDIA Ministry of Health Blindness Control 122 Nirman Bhawan New Delhi 110001 India Cable: HEALTHFUND Telex: 31-66119131-65413 Telephone: 301-7481 - 145 - VI. SOUTH ASIA REGION (Cont'd) COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE INDIA (Cont'd) Department of Health Population IX 122 & Family Welfare Government of Rajasthan Secretariat Jaipur India Fax: 0141 520528 Telex: 52047 Telephone: 520335 Department of Health & Family Welfare Assam Secretariat Dispur, Guwahati India Fax: 0361 60900 Telex: 0235 2237 DIG IN Telephone: 61402 NEPAL Ministry of Finance Public Resource Management 130 Hari Bhawan Kathmandu, Nepal Fax: 977-1-227529 Telex: 9477-2249 Telephone: 222598 PAKISTAN National Cresent Karachi Hydrocracker 132 Petroleum Limited (NCPL) 2nd Floor, Karim Chambers Annex Meriwether Road P.O. Box 8548 Karachi, Pakistan Fax: 92-21-568-0615 Telex: 24794 NPL P Telex: 92-21-568-3152 SRI LANKA To be determined Vocational and Technical 136 Education and Training Agroindustry Technical Agricultural Diversification 136 Assistance Foundation (to be created) Local Financial Intemediaries - 146 - VIII. PROJECTS DROPPED FROM LENDING PROGRAM AND PROJECTS SIGNED I. AFRICA REGION COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE ANGOLA Ministry of Education Education I 2 CAPE VERDE (ENAPOR) Empresa Nacional Public Infrastructure 8 de Administracio dos Portos and Factors Upgrading CENTRAL AFRICAN REPUBLIC Ministry of Public Transport Sector II 8 Works & Transport Ministry of Rural Agriculture Services 8 Development CHAD To be determined Agricultural Research 9 COTE D'IVOIRE Prime Minister's Office Privatization Support 11 Ministry of Finance MADAGASCAR Ministry of Education Education Sector 19 (Bureau des Projets Education) NIGER Ministry of Agriculture Agricultural Services 27 and Livestock Ministere de la Sante Population 27 Publique, Ministere du Plan, Ministere des Affaires Sociales et de la Promotion de la Femme NIGERIA Federal Ministry of Water Rehabilitation 31 Water Resources (FMWR) - 147 - I. AFRICA REGION (Cont'd) COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE UGANDA Uganda AIDS Commission Uganda AIDS Control 37. Office of the Northern Reconstruction 38 Prime Minister II. EAST ASIA & PACIFIC REGION CHINA Zhejiang Province Zhejiang Provincial 48 Communications Department Highway INDONESIA Directorate General of Tree Crop Smallholder 55 Estates KOREA Ministry of Education Science Education and 56 Libraries Computerization Ministry of Education Vocational Schools 56 Development Pusan and Taejon Pusan and Taejon 57 City Goverments Sewerage PHILIPPINES National Electrification Rural Electrification 64 Administration (NEA) THAILAND Provincial Electricity Distribution System 66 Authority (PEA) Upgrading III. EUROPE AND CENTRAL ASIA REGION HUNGARY National Bank of Hungary Enterprise Reform 71 Ministry of Economy Private Farmer and 75 and Finance Enterprise Support - 148 - III. EUROPE AND CENTRAL ASIA REGION (Cont'd) COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE HUNGARY (Cont'd) Ministry of Finance SAL 75 TURKEY Treasury Technical Assistance 76 Treasury Data Systems Cukurova Elektrik A.S. Berke Hydro Power 77 (CEAS) Ministry of Agriculture Agricultural Research 78 and Rural Affairs, Ministry of Forestry IV. LATIN AMERICA AND CARIBBEAN REGION DOMINICAN REPUBLIC Ministry of Public Works Fifth Road Rehabilitation 90 and Maintenance (formerly Highway Maintenance V) MEXICO Secretaria de Agricultura Agricultural Technology 98 V. MIDDLE EAST AND NORTH AFRICA REGION ALGERIA Ministry of Equipment/ Construction Industry 108 Credit Populaire d'Algerie IRAN Tehran Municipality Tehran Drainage 111 Sistan-Baluchistan Sistan River Flood 111 Regional Water Board Works Rehabilitation YEMEN, REPUBLIC OF Ministry of Agriculture National Land and Water 117 and Water Resources Conservation First - 149 - VI. SOUTH ASIA COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE PAKISTAN Punjab Department Middle Schooling 135 of Education SRI LANKA Ministry of Finance Local Government 138 Development Ministry of Agriculture, Agricultural 138 Development and Research Extension II ’·,..,...&.:.【·.,떼.《」..-:」..11.·.&....!…,,‘「:』‘-』*-- MONTHLY OPERATIONAL SUMMARY ANNEX I As explained in "Information about the Environmental Assessment Process," environmental classifications for all projects are included in the Monthly Operational Summary every month. This quarterly annex contains: 0 For Category A projects, the environmental data sheet containing information about the issues and schedule of the environmental assessment process; 0 For Category B projects, a header showing project status. Environmental data sheets for B, C and the remaining carry-over D projects have not been reproduced here because of the volume involved but are available to the public on a request basis. An y request should identify the data sheets desired by project name and identification number (e.g., 3AFRPA000). Request for a data sheet may be made by writing: Environmental Data Sheets Environment Department Room S-5141 World Bank 1818 H Street, N.W. Washington, DC 20433 USA or by telephoning 1-202-473-1262 and leaving a message. , � 1 1 / ♦ . 1 � � � г , f . �• � , 1 г + ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : AFR. REGION Project ID No: 3AFRPA004 Project : Adjarala Hydroelectric Appraisal Date : May 15, 1993 Total Project Cost: $212.00 Board Date : Mar. 01, 1994 Managing Division : AFlIE - Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: 2nd Quarter, 1993 Date EA Category Assigned: Nov. 20, 1988 MAJOR PROJECT COMPONENTS: Adjarala Hydro scheme (80 MW, 250 Gwh) 97 km downstream of Nangbeto on the Mono River on boundary Togo-Benin, with associated transmission, management and engineering services, population resettlement and compensation, and environmental and health protection programs; also power sector studies, TA and training for CEB, CEET and SBEE. MAJOR ENVIRONMENTAL I SSUES: Population resettlement and compensation, Environmental protection, Health protection, Downstream hydrology. OTHER ENVIRONMENTAL ISSUES: To be determined. PROPOSED ACTIONS: Environmental Assessment under preparation. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: About 10,000 people affected by resettlement. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Consultants appointed and work commenced on all issues listed above. EA first draft issued in October 1991. Resettlement plan is being developed with the involved communities. REMARKS: Environmental reconnaissance has been made. Bidding documents -and contracts will include environmental clauses. Environmental panel will be established. Environmental unit will be created within CEB. Contacts with population involved and NGO underway. 1-2 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS, Country : CAMEROON . Project ID No: 3CAMPAO90 Project : Ecological Protection Appraisal Date : Aug. 10, 1992 Total Project Cost: $20.00 Board Date : Jun. 15, 1993 Managing Division : AFlAG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Mar. 1993 Date EA Category Assigned: June 23, 1992 MAJOR PROJECT COMPONENTS: (a) Reforms of policies regarding (i) land use planning, (ii) regeneration of forest resources, and .(iii) forestry fiscal system. (b) Development of a system of protected areas for wildlife and biodiversity conservation. (c) Development of sustained management of forest reserves in the dense forest zone. (d) Institutional support for (a), (b), and (c) and research in forestry and biodiversity conservation. MAJOR ENVIRONMENTAL ISSUES: This project addresses major environmental issues in Cameroon, such as land use planning, conservation of biodiversity and sustained management of forest resources. An environmental assessment will be conducted for this project. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Project was re-classified as Category A because of the sustainable forest management component. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: EA start up date - January 1993, EA first draft - March.1993. REMARKS: WWF/Cameroon and World Conservation International actively involved in project preparation. 1-3 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : EQ. GUINEA Project ID No: 3EQGPA014 Project : Natural Resource Management and Conservation Appraisal Date : Nov. 25, 1992 Total Project Cost: $10.00 Board Date : Nov. 09, 1993 Managing Division : AF1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: To be determined Date EA Category Assigned: Mar. 25, 1992 MAJOR PROJECT COMPONENTS: The project's overall objective would be to assist the Government to implement a national natural resource management plan in order to assure both an optimal production level from the forest and conservation of the environment. In support of the above objectives, the project would include the following components: (a) preparation and implementation of a natural resource management program; (b) conservation and management of natural forests; .(c) establishment and management of.protected and multiple use areas; and (d) institutional strengthening of the Ministry of Agriculture and Forestry. MAJOR ENVIRONMENTAL ISSUES: Establishment of sound environmental practices is a major focus of the project. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: Still to be determined. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: According to the OD 4.01 guideline, this project is under Category A. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Separate EA is required. EA will be prepared with technical support from Norway Consultant Trust Fund. Work will start in July 1992. REMARKS: Project has institutional building focus as well as establishment of sound environmental activities. 1-4 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : GABON Project ID No: 3GABPA011 Project : Forestry & Environment Appraisal Date : Nov. 18, 1991 Total Project Cost: $35.00 Board Date : Jun. 30, 1992 Managing Division : AF1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: November 1991 Date EA Category Assigned: March 1992 MAJOR PROJECT COMPONENTS: (a) Institutional strengthening; (b) forestry research; (c) forestry training; (d) inventory and rehabilitation of Okoume stands; (e) studies for environmental protection; and (f) creation and maintenance of reserves. MAJOR ENVIRONMENTAL ISSUES: Most project components are considered to be D/C activities. The project is expected to have a positive environmental impact. An Environmental Impact Assessment is however being done. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: N/A JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The initial classification was a D, however, the new guidelines would reclassify it an A requiring an Environmental Assessment. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Started in June 1991 with first draft submitted early November 1991. EA process is now completed. EA summary sent to Executive Directors on April 27, 1992 after permission to release was received from the Borrower. REMARKS: The conservation of forest is a localized issue mainly in areas with 100 km of coast line and around Libreville. Adequate extensive forest management would be sufficient in the rest of the country. Wildlife of the coastal and estuarine areas could be protected through the creation of reserves. Additional reserves in the rest the country would ensure further wildland protection. I-5 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : GHANA Project ID No: 3GHAPAO94 Project : Power VII Appraisal Date : Mar. 15, 1993 Total Project Cost: $65.00 Board Date : Jan. 11, 1994 Managing Division : AF4IE Sector: Industry Lending Instrument: Specific. Investment Loan Status: Lending Date for receipt of EA by Bank: Date EA Category Assigned: MAJOR PROJECT COMPONENTS: Provision of additional thermal generation needed to complement hydro power; possibly additional transmission and distribution based on power master plan; technical assistance for institutional building. MAJOR ENVIRONMENTAL ISSUES: No major environmental issues are expected since the thermal generation will be gas turbine with very minimal environmental impact. OTHER ENVIRONMENTAL ISSUES: Risk of oil spillage; noise. PROPOSED ACTIONS: Training and equipment. Noise reduction package. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Environmental risk is minimal and the plant will meet international emissions standards. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Draft feasibility study of February 1992 being revised. REMARKS: None. 1-6 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : COTE DIVOIRE Project ID No: 3IVCPA103 Project : Livestock Appraisal Date : Oct. 15, 1992 Total Project Cost: $50.00 Board Date : Jun. 15, 1993 Managing Division : AF1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: To be determined Date EA Category Assigned: Mar. 19, 1992 MAJOR PROJECT COMPONENTS: To be determined. MAJOR ENVIRONMENTAL ISSUES: To be determined. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: To be determined. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The EA Category A is assigned at this early stage of preparation. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Not yet started. REMARKS: None. 1-7 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : NIGERIA Project ID No: 3NIRPA169 Project : Industrial Pollution Control Appraisal Date : Jun. 10, 1993 Total Project Cost: $120.00 Board Date : Jun. 07, 1994 Managing Division : AF4IE Sector: Power Lending Instrument: Specific Investment Loan Status: Standby Date for receipt of EA by Bank: Date EA Category Assigned: June 24, 1992 MAJOR PROJECT COMPONENTS: To be determined. MAJOR ENVIRONMENTAL ISSUES: Control and reduction of industrial pollution, identifying polluting industries. OTHER ENVIRONMENTAL ISSUES: Selection of pollution control technology. PROPOSED ACTIONS: Conduct an EA. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The project will address pollution issues in the country caused by industrial effluents. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Too early to determine EA schedule.. REMARKS: None. I-8 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : SENEGAL Project ID No: 3SENPAO95 Project : Urban IV Appraisal Date : JAN. 15, 1993 Total Project Cost: $59.00 Board Date : Jul. 13, 1993 Managing Division : AF5IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Sep. 1992 Date EA Category Assigned: Nov. 27, 1991 MAJOR PROJECT COMPONENTS: Three main components: (a) institutional development on both central and local government levels; (b) physical investments encompassing public infrastracture and facilities; and (c) project management for the recurrent costs. MAJOR ENVIRONMENTAL ISSUES: The situation of environmentally dangerous living conditions and the low quality of public services, principally of housing, water and sanitation. OTHER ENVIRONMENTAL ISSUES: Industrial hazards and uncontrolled pollution usually in the Cap Vert Peninsula. PROPOSED ACTIONS: Sectoral Environmental Assessment Study (Diagnostic of the Sector). JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: \The project is an "A" because a number of similar development activities with potentially cumulative impacts are planned for a variety of specific "city projects". SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The consultant carried out the preliminary study and agreement should be obtained from the government on the proposed methodology. The sectoral urban environmetal assessment study will be included in the project's feasibility study, whose start-up is planned for September 1992. REMARKS: None. I-9 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : TANZANIA Project ID No: 3TANPA084 Project : Power VI Appraisal Date : Jul. 11, 1992 Total Project Cost: $337.00 Board Date : Feb. 09, 1993 Managing Division : AF6IE Sector: Power Lending Instrument: Specific Investment Loan Status: Standby Date for receipt of-EA by Bank: Completed Date EA Category Assigned: MAJOR PROJECT COMPONENTS: (a) Construction of Lower Kihansi Hydro Electric Scheme consisting of 3x54 MW units and associated transmission; (b) rehabilitation of existing facilities (generation and distribution); (c) extension of the distribution network; (d)einstitutional reforms, including implementation of the second phase of MIS and training; and (e) studies. MAJOR ENVIRONMENTAL ISSUES: Environmental study completed. The study reviewed and the Kihansi site visited by the Bank (AFTEN). OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: N/A JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Large hydropower projects are category A under OD 4.01 guidelines SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The study was made available to the EDs on June 19, 1992. REMARKS: None. I-10 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : UGANDA Project ID No: 3UANPA084 Project : Cotton Subsector Appraisal Date : Jul. 01, 1993 Total Project Cost: $20.00 Board Date : Jun. 28, 1994 Managing Division : AF2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date for receipt of EA by Bank: Date EA Category Assigned: MAJOR PROJECT COMPONENTS: (a) Policy and regulatory improvements; (b)'support to research; (b) private sector development initiatives; and (d) support to production activities. MAJOR ENVIRONMENTAL ISSUES: (i) Contamination due to use of chemicals and pesticides; (ii) air pollution due to cotton dust and lint; and (iii) excessive exposure to cotton dust leading to respiratory diseases. OTHER ENVIRONMENTAL ISSUES: (i) Increased draught power (livestock) leading to overgrazing; and (ii) intensification of cotton production may lead to soil erosion. PROPOSED ACTIONS: A thorough environmental assessment planned prior to appraisal. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Category "A", because there are major environmental issues. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: EA start-up date around October 1992. REMARKS: None. I-11 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No: 4CHAPA105 Project : Shanghai Port III Appraisal Date : May 21, 1992 Total Project Cost: $200.00 Board Date : Nov. 24, 1992 Managing Division : EA2TP Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Feb. 29, 1992 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: - Construction of two new terminals at Luojing and Waigaoqiao on the Yangtze River - Purchase of equipment for both the new and existing terminals - Implementation of an MIS to upgrade operations and management, including financial 'management - An action plan for restructuring the existing port facilities on the Huangpu River to rationalize their use MAJOR ENVIRONMENTAL ISSUES: The water quality of the Huangpu and Yangtze Rivers and their tributaries and inland waterways linked to them is poor due to a combination of uncontrolled sanitary sewage, storm water drainage and industrial effluents from small enterprises, leading to contaminated underlying sediments. Thus a major issue is to ensure that the consruction of new terminals will not contribute to the further deterioration of the quality of the water and related ecosystems. The other related issues are: impact of additional traffic on roads that will serve the new terminals, both during construction and in operation after commissioning, and safety measures to deal with it; management and monitoring of construction to protect the environment; monitoring and management of air quality at the new coal handling terminal at Luojing; resettlement of people who may be affected by the construction of the new terminals. As the new facilities are brought into operation, use of the older terminal in the city center for cargo handling will be phased out: this will have a positive impact on the environment in the Shanghai urban area. The safe disposal of dredged material resulting from ongoing maintenance dredging in the present port area, which is not in any way affected by the proposed project, will continue to be a matter of concern. Air pollution from coal handling at one of the terminals on the Huangpu River is an environmental hazard, as are illegal discharge of ships' wastes and oil spills- caused by marine accidents. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: The impact of dredging and the disposal of dredged material in the 1-12 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS on-going project has been studied by the Chinese authorities and reviewed by an environment expert and provision to help implement the recommended safety measures will be included in the project. At the new terminals at Luojing and Waigaoqiao, sewage and drainage from the facilities and operations will be collected and treated in secondary treatment facilities before discharge into the river. Storm water and other effluents (e.g., wash water from the washing of containers, etc.) will similarly be collected and treated before discharge. Older facilities on the west side of the Huangpu River are connected to the municipal sewage system; those on the east side have their own collection tanks for sewage which is then trucked away. New facilities. to be constructed under the proposed project will be designed so as not to impede the flow of currents in the Yangtze River and will be situated in sufficiently deep water to avoid dredging. Hydraulic model tests are being carried out to arrive at the optimal design of these facilities. For coal handling water sprays will be provided to contain dust. Facilities for the collection and treatment of ships' wastes and the drawing*up of a contingency plan to handle accidental oil spillage are being considered for GEF/IDA financing under a separate project. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The needs to ensure safe disposal of contaminated spoils from dredging and to minimize the potential hazard for further pollution of waters from the operation of the new facilities were.factors that contributed to the project being designated as a Category A project for environmental evaluation. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: An environmental assessment report (in Chinese) has been furnished to the Bank. An environment expert assisted SPA in the final preparation of the EA to meet Bank's requirements. The report, along with a summary, recommended additional environment protection measures and these will be discussed with the borrower. REMARKS: As agreed by current Government regulations, SPA has already completed environment impact assessments of the proposed Luojing and Waigaoqiao terminals through the Shanghai Environment Protection Sciences Institute. Recommended mitigatory measures are being incorporated in the design of the new terminals. Currently each existing terminal has its own environment monitoring center, supervised by SPA's Environment Monitoring Office. Also, SPA has developed an extensive environment action plan as part of its Eighth Five Year Plan: this includes the upgrading of effluent treatment facilities at existing terminals as well as the provision of facilities for waste treatment. 1-13 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No: 4CHAPA112 Project : Guangdong Provincial Highways Project Appraisal Date : Feb. 27, 1992 Total Project Cost: $840.00 Board Date : Dec. 08, 1992 Managing Division : EA2TP Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Jan. 1992 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: The project would include construction of two four-lane divided, access controlled, highways comprising: (a) the 80 km Foshan-Kaiping Highway and (b) the 149 km Longgang-Tanxi Highway (c) a Provincial Road Improvement Program (RIP) to upgrade National and Provincial roads, with road sections selected annually to agreed criteria; (d) procurement of equipment for construction supervision, maintenance, and economic analysis; (e) technical assistance and training for construction supervision, highway maintenance, and highway program management; (f) a component to guide reform of highway financing. MAJOR ENVIRONMENTAL ISSUES: Environmental Impact Assessments were received by the Bank in October 1991. The alignments of Foshan-Kaiping and Longgang-Tanxi highways from the points of view of: resettlement provisions, possible pollution from noise and vehicle emissions (on air and water quality) during both construction and operation, erosion effects due to improper construction planning, and the effects of embankments and borrow pits on drainage and landuse. Pollution effects of the new highways will be offset to some extent by reductions in pollution on the existing highways. OTHER ENVIRONMENTAL ISSUES: The provincial road component of the project, known as the Road Improvement Project (RIP), mainly involves rehabilitation in a existing right-of-way. Only minor environmental issues are expected. These would relate to transport and construction materials, noise, and air/water quality issues related to road resurfacing. Where realignment of provincial roads is required, the issues are more varied and similar, but in smaller scale, to the expressways. PROPOSED ACTIONS: The resettlement process will be monitored for compliance with OD 4.30. The construction and operation of the two major highways will be monitored by an Environmental Monitoring Unit (now being set up) to ensure that the Environemtnal Action Plans (see below) are implemented adequately. Environmental Management processes are being developed for controlling potential impacts within the RIP component. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Major infrastructure project with important implications for environment 1-14 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS and resettlement. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: EAs have been prepared for the Foshan-Kaiping and Longgang-Tanxi highways, and the Executive Summaries were circulated to the Executive Directors of the Board on February 20, 1992. Bank environmental and resettlement experts have inspected the alignment and reviewed the draft EAP. and RAP for each major route; these were submitted to the Bank in February 1992. A final EAP and RAP for each major highway, and each road in the first phase of the Road Improvement Program, is required by negotiations. A sector environmental assessment and sector environmental action plan are being prepared for the RIP component of the loan. REMARKS: None. 1-15 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No: 4CHAPA156 Project : Xiaolangdi Appraisal Date : Oct. 23, 1992 Total Project Cost: $2,860.00 Board Date : Jun. 01, 1993 Managing Division : EA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date for receipt of EA by Bank: Sep. 1992 Date EA Category Assigned: First Qtr 1991 MAJOR PROJECT COMPONENTS: (a). Construction of a rockfill dam 171 m high, 1370 m.crest length and 56 mcm of fill; (b) construction of a hydropower station with total capacity of 1800 MW; (c) resettlement of 190,000 people in the two provinces of Shanxi and Henan; and (d) construction of additional works for river channel stabilization. MAJOR ENVIRONMENTAL ISSUES: The project will have very significant environmental benefits. It will provide flood protection for about 1.2 million people, increasing the water supply for cities of about 15 million people, reduce unsustainable - natural sediment deposition in the lower reaches of the river; firm up irrigation for 1 million ha; and generate a portion of the peak power needs of Henan and China's central region. The project will increase the safety.of some 100 million people downstream from catastrophic floods. The major environmental issue.relates to the resettlement of 190,000 people who live in the reservoir area, over a 15-year period..,1Dams of this size generally have many,other negative impacts on downstream fisheries, water quality, health, etc. However, unlike other rivers, the Yellow River presently has the highest silt load in the world. With this dam, silt load will be dramatically reduced, low flows will be increased, and water quality improved. The downstream drainage conditions will be improved by less periodic flooding. Hence the health effects downstream will improve and because of less silt and increased low flows, the estuary and river fisheries will be improved quite dramatically. Other environmental impacts of the dam are relatively minor. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: The Yellow River Water and Hydropower Development Corporation (YRWHDC) is completing detailed planning of the resettlement component for all relocatees below-180m level and undertaking detailed resettlement feasibility studies for relocatees between 180m and 275m. YRWHDC and the provinces have now had detailed discussions on sites for settlements and industries to be created for the damsite relocatees up to 180m. Government has been informed now that detailed resettlement designs up to the 180m level are required by the Bank prior to appraisal, as well as'detailed feasibility study level plans for above 180m level relocatees. The YRWHDC has already spent 1-16 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Y7 million to start preparation of the detail designs for the resettlement component. YRWHDC has now obtained a further Y20 million to undertake settlements on four sites for 2,000 families (10,000 people) for damsite area resettlement to ensure that all contingencies during resettlement operations are adequately covered. By December 1, 1992, YRWHDC is expected to complete detailed designs for resettlement of 37,000 people up to a reservoir inundation of 180m level. An international resettlement and environmental panel reviewed in June/October 1991 the draft environmental impact assessment (EIA) which was originally prepared by YRWHDC and is now being revised by Canadian Yellow Joint Venture Consortium of consultants (CYJVC). The environmental panel member reviewed in March 1992 the final EIA report. The preliminary assessment by the panel member is that the project will have some negative impacts in the upstream areas due to rats and some water borne diseases which will be offset by environmental management plans costing Y90 million during the course of the project. But the positive impacts of the project are significant in terms of flood control, irrigation benefits, power production and sediment control benefits. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Potential impacts of the project could be significant, large-scale and diverse and therefore warrant a full-scale environmental assessment. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: YRWHDC has completed an environmental assessment report (fifth edition) which covers in detail all aspects of the project. The reports were reviewed by a Bank mission in September 1991 and in general, there appear to be no major issues. A detailed resettlement report will be reviewed in October 1992. The major issue in the resettlement planning has been the ground truthing of detailed planning of YRWHDC with the counties and the agreements to be reached with host areas. All relocatees in the damsite areas themselves will have to be moved by Sept. 1993 and also by this period, at least 30% of people living below 180m will have contractual agreements to move into host villages. The CYJVC,are now preparing detailed reports on the detailed designs,up to 180m level, feasibility studies for all settlement areas 180m to 275m levels and compensation payment requirements. The Government is now allocating considerable funds to ensure that the planning and design work are undertaken adequately. The major issue that still remains is that detailed studies at field level require the full involvement of the county and provincial planning design institutes in the planning and design process. REMARKS: The Government is very serious about ensuring that the resettlement component is properly executed. They are also very serious about ensuring that all negative impacts as a result of the dam are mitigated. 1-17 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No: 4CHAPA175 Project : Henan Highways Appraisal Date : Feb. 19, 1992 Total Project Cost: $300.00 Board Date : Jan. 05, 1993 Managing Division : EA2TP Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: February 1992 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: The investment component would cover construction of a single-carriage expressway (120 km), rehabilitation and improvement of five provincial roads (180 km), upgrading of six rural roads (112 km) and other roads that meet agreed technical, economic and environmental criteria. The institutional strengthening and reform component would aim to improve the province's capabilities for investment planning, maintenance and construction; impoeve the capability of road transport services; introduce road user facilities and establish a system of economically efficient toll roads in the expressway. MAJOR ENVIRONMENTAL ISSUES: An Environmental Impact Assessment,for the proposed section of the State Expressway 310 between Kaifeng and Luoyang was completed in June, 1989. Major environmental issues that could be associated with the project include an increase in ambient noise during construction and operation of the expressway, possible flooding during high rainfall episodes (due to the road acting as dyke), water quality issues related to cross-road access and pedestrian safety, and resettlement of people and loss of assigned cropland within the road right-of-way. Transport of construction materials along existing roads may also result in road damage and a temporary increase in traffic problems along roads leading to the expressway. The provincial and rural roads component of the project mainly involves rehabilitation within the existing right-of-way. Only minor environmental issues are likely when work is limited to existing alignments. These relate to transport of materials, construction noise, and air/water quality issues related to the use of bitumin during activities directed at sealing the road surface. Where realignment of provincial roads as required, the issues are more varied and similar, but on a smaller scale, to the expressway. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: The EIA has been reviewed and responses received to requests made to Henan's Communications Department to clarify and expand upon traffic issues, quarry and borrow pit operation, design and,.location of cross-road access, and to provide more detailed identification of areas within or near the road right-of-way that have cultural, archeological and historical significance. The MOC has prepared an Environmental Action Plan (Management I- 18 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS and Monitoring plans) and a resettlement plan that includes this additional information and that conforms with the Bank's EAOD and involuntary resettlement requirement. The preappraisal and appraisal mission reviewed the environmental and resettlement related aspects of the project. This included the Environmental Action Plan submitted by Henan Province. Additional information requested of Henan Province by the preappraisal mission included: (i) identification of organizations responsible for responding to spills and accidents involving toxic and hazardous materials, and training and equipment required to respond safely and effectively to such incidents; (ii) an environmental survey (to be conducted by the Provincial Environmental Protection Bureau) of quarries and borrow areas identified as possible sources of materials for road works to ensure that they can be operated in an environmentally acceptable manner; and (iii) preparation of guidelines for contractors specifying hours of permissible operation to minimize noise Impacts in areas of human habitation and congregation. The February 1992 appraisal mission received and reviewed this information along with the environmental and resettlement related aspects of the project. The Appraisal Mission also reviewed the preliminary EA for the Sanmenxia Border Road and the provincial codes of engineering practice for betterment, capacity improvement and rehabilitation of provincial, county and rural roads to ensure that adequate provision is made for environmental management of these works. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The expressway is a major civil engineering projects that will pass through or near populated and historically significant areas. It will also require some land that would otherwise be useful for.agriculture. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The Environmental Assessment of the Kaifeng to Louyang segment of State Expressway 310 is completed, as is the draft environmental action and resettlement plans describing the handling of environmental impacts and land compensation and resettlement requirements. Supplementary information on the resettlement plan and,on management of potential environmental impacts of the expressway, the preliminary EA and management plan for the new section of provincial road within the project, and detailed resettlement plan have been reviewed by the Appraisal Mission. Details of implementation of the action and resettlement plans were also discussed and finalized by the Appraisal Mission. REMARKS: An independent monitoring program for assessing implementation of the RAP is being developed. 1-19 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No: 4CHAPA203 Project : Sichuan Gas Development & Conservation Appraisal Date : JAN. 03, 1993 Total Project Cost: $1,000.00 Board Date : Jun. 29, 1993 Managing Division : EA2IE Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Jan. 1993 Date EA Category Assigned: Feb. 13, 1992 MAJOR PROJECT COMPONENTS: (a) Appraisal and development of gas fields, rehabilitation of aging fields; (b) upgrading of gas transmission/distribution systems; (c) product upgrading, energy conservation and pollution control measures at selected fertilizer plants; and (d) TA and training. MAJOR ENVIRONMENTAL ISSUES: The proposed project would have significant environmental benefits: increased gas supply and utilization would reduce coal consumption, which would in turn reduce emissions of S02, C02, and particulates. In addition, reduced gas leakage in the transmission and distribution systems would reduce emissions of methane, a potent greenhouse gas. Nevertheless, various safety and environmental considerations require special attention, including treatment and discharge of wastewater from well drilling, gas production and utilization as well as safety concerns in the operation and maintenance of gas pipelines. OTHER ENVIRONMENTAL ISSUES: The only other environmental issue is one of worker safety and training, both of which will be enhanced through this program. PROPOSED ACTIONS: An environmental expert has assisted the identification mission in defining the terms of reference for an EA report. An international consultant would be contracted shortly to assist the Chinese authorities in the prepration of the EA report. Further, various preinvestment studies would be carried out with the assistance of international consultants, and the project design and implementation will conform with international engineering and safety standards as well as sound environmental practices. One of these studies would be financed under the preinvestment facility of the Global Environmental Fund (GEF). JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: According to OD 4.01, since this project will eventually entail rehabilitation (construction) on a large scale, over a wide area, an "A" category is mandatory. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: 1-20 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS EA will be prepared by borrower and be available to Bank prior to departure of Appraisal Mission. REMARKS: None. II I1 1-21 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No: 4CHAPA216 Project : Second Shanghai Metropolitan Transport Project Appraisal Date : JAN. 06, 1993 Total Project Cost: $500.00 Board Date : Dec. 07, 1993 Managing Division : EA2TP Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Oct. 1992 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: To be determined but likely to include: - Extension of upgrading/construction of Inner Ring Road (IRR) work commenced under first project to provide additional 23.7 kms of urban anterial road., Current design is 2 x 2 kms viaduct over six lane ground level road. - Extension of the traffic management component and the non-motor vehicle (NMV) route component of the first Shanghai Metropolitan Transport Project (SMTP I), to the whole area within the Inner Ring Road. This would involve line marking, signage, channelization, traffic signals, and junction remodelling. MAJOR ENVIRONMENTAL ISSUES: Resettlement of some 5,500 households, and some 450 factories. Potential increased noise and air pollution adjacent to IRR. Potential for induced development. Impacts during construction. OTHER ENVIRONMENTAL ISSUES: Potential for vibration. To be discussed in next mission (July 1992). PROPOSED ACTIONS: Draft EA and environmental action plan will be discussed with the Shanghai Municipal Government during next mission (July 1992). JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Substantial resettlement and potential increased noise and air pollution. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Draft Environmental Impact statement for the IRR prepared by Shanghai Municipal Government provided to Bank Mission in November 1991. REMARKS: None. 1-22 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No: 4CHAPA220 Project : Fujian Provincial Highway Project Appraisal Date : Jun. 15, 1993 Total Project Cost: $300.00 Board Date : Mar. 15, 1994 Managing Division : EA2TP Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: February 1993 Date EA Category Assigned: 4/28/92 MAJOR PROJECT COMPONENTS: (a) Construction of a four-lane access controlled highway between Xiamen-Quanzhou (76 km); (b) assistance for the development and improvement of provincial and country roads with the framework of the Province's road investment program under the 8th and 9th FYPs; (c) assistance for the institutitonal development and needed resources for the strengthening of the provincial road construction industry; (d) procurement of equipment for highway operation, road maintenance and for collection and analysis of data to facilitate the determination of road investment priorities; and (e) TA for construction supervision and staff training. MAJOR ENVIRONMENTAL ISSUES: The EA for the Xiamen-Quanzhou highway would assess air, noise and water pollution and other environmental risks which may emerge during the construction and operation of the highway as well as the extent of social disruption. The EA would identify measures to be taken at the design, implementation and operation stage of the highways and for each potential environmental risk a clearly defined plan would be drawn up identifying the entities responsible for actions. OTHER ENVIRONMENTAL ISSUES: None at this stage. PROPOSED ACTIONS: The EA would be-carried out through the Fujian Provincial Environmental Protection Institute and MOC's 2nd Marine Engineering Survey and Design Institute during the second half of 1992. The next Bank mission scheduled to visit Fujian Province in May, 1992 would further discuss the procedures to be followed with the-executing agencies for the project components as well as with the institutions involved in the preparation of EA. An understanding would also be reached regarding procedures for the environmental analyses of subprojects under the provincial/county road development component of the project. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: During the project identification mission in November 1991, the Bank's 1-23 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS general requirements concerning the environmental assessment and the resettlement process were discussed with the province and an understanding was reached on cooperation between the Province and the Bank in the preparation of appropriate action plans to assure that the project will not cause adverse impact on the environment and people affected by the project will be resettled in an orderly and satisfactory manner. REMARKS: None. 1-24 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No: 4CHAPA225 Project : Fertilizer Restructuring Project Appraisal Date : Jun. 15, 1993 Total Project Cost: $920.00 Board Date : May 17, 1994 Managing Division : EA2IE Sector: Industry Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Jan. 31, 1993 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: The proposed project would include four major components: (a) Yunfu Phosphate Development; (b) Medium-sized Plants Rehabilitation; (c) small Enterprise transformation; and (d) TA, Training and Studies. MAJOR ENVIRONMENTAL ISSUES: Having realized the importance of chemical fertilizers for the development of its agricultural sector, China indulged in the 1950s-1970s in establishing an indigenous, mainly coal-based, fertilizer industry fully based on local technology and currently comprising around 1,700 small- and medium-sized plants producing nitrogen or phosphate fertilizers. Although technology for large-sized process and equipment has been transferred from overseas since the late 1970s, about 50% of China's nitrogen fertilizers and more than 75% of its phosphate fertilizers still come from its small- and medium-sized plants. As these plants are predominantly coal-based, use obsolete technologies and predominantly produce low-grade highly volatile ammonium bicarbonate (ABC) or low-grade phosphatic products (single superphosphate, SSP, and fused calcium magnesium phosphate, CMP), their energy consumption and toxic emissions are excessive and they are a major contributor to China's highest ranking in Asia's greenhouse gas emissions. Furthermore, China's low standards in the chemical processing of coal and mineral phosphates have led to unacceptably high levels of toxic emissions (such as cyanides, phenols, aromatics and polycondensates, fluorine, S02, NOx, etc.) from the majority of its small and medium-sized fertilizer plants. An additional ecological burden is caused by the high dust emissions from these plants. OTHER ENVIRONMENTAL ISSUES: The establishment of a large phosphatic fertilizer complex at Yunfu, Guangdong province, proposed under this project, could cause a major environmental issue if inadequate measures are taken to contain the emission of fluorine, sulfuric acid mist and S02, and other toxic compounds into waste water and the atmosphere. Additionally, adequate steps have to be taken for the safe and adequate disposal of phospho-gypsum from the phosphoric acid plant. PROPOSED ACTIONS: (a) Establish or identify a centralized unit in an appropriate institution to review and support environmental tasks under this project, if required, add a TA component to strengthen capability of the existing 1-25 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS institutions; (b) prepare an environmental sector study; (c) prepare regional environmental sector studies in selected provinces to establish criteria for screening existing plants for closure, retrofitting and/or expansion; (d) an action plan including criteria and timetable for plants to be retrofitted and shutdown should be provided by MCI; and (e) an EA in accordance with GOC regulations will be prepared for each new or retrofitted plants. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: EA requirement for the individual projectcomponents has been discussed with MCI. TORs and action plan were prepared and agreed during the Identification Mission which took place in March/April 1992. REMARKS: The proposed project would establish a major milestone in the development of the Chinese fertilizer sector, as it addresses almost all major current issues including environment and energy consumption, and would assist in accelerating, the restructuring and modernization of the fertilizer industry. The project would have a major positive environmental impact on the whole sector by: (a) significantly reducing energy consumption and environmental pollution in about 30 selected small-sized ABC (causing significant ammonia and carbon dioxide emissions due to decomposition, high transportation costs, very labor intensive) by high-grade urea (almost 3 times more concentrated); (b) significantly reducing energy consumption and environmental pollution in about seven selected medium-sized nitrogen fertilizer plants; (c) creating demonstration models for the modernization/ rehabilitation of a large number of similar plants in future; (d) providing international expertise and technology for the proposed phosphate complex at Yunfu to ensure high performance and emission standards commensurate with international codes; and (e) institutional development to strengthen local management, engineering and equipment manufacturing capabilities and create a better awarenese of environmental protection and to facilitate a higher standard in preparing environmental impact assessments. 1-26 ENVIRONMENTAL DATA SHEET FOR ,CATEGORY "A" PROJECTS- Country : INDONESIA Project ID No: 4INSPA189 Project : Semarang-Surakarta Urban Development Appraisal Date : Nov. 01, 1992 Total Project Cost: $150.00 Board Date : Jul. 13, 1993 Managing Division : EA3IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Oct. 1992 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: (a) Improvements of urban infrastructure and services including water supply, drainage, sanitation and sewerage, solid waste management, urban transport, and KIP; and (b) supporting TA for implementation assistance, financial strengthening, and institutional development in the cities of Semarang and Surakarta. MAJOR ENVIRONMENTAL ISSUES: The preliminary EAs have identified the following project elements as major environmental issues and have recommended that detailed EA studies (ANDALs) be carried out: (a) Semarang -- (i) solid waste landfill site selection and development; (ii) first phase of sewage collection and treatment system including sludge treatment facility; and (iii) resettlement of several hundred people due to Kali Banger drain construction; (b) Surakarta -- rehabilitation of existing sewerage schemes and construction of treatment facility. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: Ensure that detailed EAs are carried out in accordance to agreed TOR and that recommendations of EA studies -- including management and monitoring actitivities -- are incorporated into project design; where necessary, the actions for compliance with good environmental management and protections will be required to be taken ahead of loan effectiveness. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The Government of Indonesia's ANDAL procedures for assessing environmental impacts, which have been accepted by the Bank as satisfactory, have been used for carrying out preliminary environmental assessments (PILs) of all investment proposals. TOR for the detailed assessments required for the four project components listed above have been reviewed and agreed by the Bank. The ANDAL studies are expected to be initiated as soon as the new project preparation consultants have mobilized and could be completed within 3-4 months using information and data available from the preliminary 1-27 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS assessments; mitigation, management and monitoring plans will be prepared as part of the detailed EA studies. REMARKS: None. 1-28 ENVIRONMENTAL DATA SHEET FOR.CATEGORY "A" PROJECTS Country : INDONESIA Project ID No: 4INSPA217 Project : Java (SURALAYA) Thermal Power Appraisal Date : Jun. 24, 1991 Total Project Cost: $2,024.50 Board Date : Jul. 14, 1992 Managing Division : EA3IE Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Completed Date EA Category Assigned: May 30, 1990 MAJOR PROJECT COMPONENTS: Expansion of coal fired Suralaya Thermal Power Plant in West Java on an existing site to meet expected growth in demand for electric power. MAJOR ENVIRONMENTAL ISSUES: Environmental issues relate to gaseous emissions (SOx, NOx, particulates), effluents (waste water treatment, leachate), thermal pollution (cooling water), ash disposal, and resettlement. OTHER ENVIRONMENTAL ISSUES: Drainage and land restoration issues, associated with coal mining. PROPOSED ACTIONS: Environmental assessment report has been prepared by PLN/consultants. Mitigation plans will be incorporated in the plant design and an environmental management plan agreed with the Bank. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: "A" category requested based on OD 4.01 Annex E. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: EIA report submitted by PLN. Environmental Assessment Summary was circulated to the Board in June 1991 (SecM91-708). REMARKS: (a) Consultations were carried out with local communities in the plant area; and (b) permission to release the EA has been granted. 1-29 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDONESIA Project ID No: 41NSPA238 Project : Integrated Swamps Development Appraisal Date :.JAN. 11, 1993 Total Project Cost: $110.00 Board Date : Jan. 18, 1994 Managing Division : EA3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Jan. 15, 1991 Date EA Category Assigned: June 1991 MAJOR PROJECT COMPONENTS: The project which would support second stage development of existing swamp sites in,Jambi, Tiau and West Kalimantan provinces would comprise 5 major components: (a) agricultural development including: (i) development and rehabilitation of drainage/irrigation infrastructure; (ii) operation and maintenance (O&M) of irrigation/drainage infrastructure; (iii) food, cash and tree crop development through provision of agricultural inputs and support services; (b) rural infrastructure improvement through construction and rehabilitation of roads and navigation networks, and improving drinking water supply; (c) land titling and certification; (d) support for coastal zone land use management; and (e) institutional strengthening to enhance the capability of relevant agencies to implement the project. MAJOR ENVIRONMENTAL ISSUES: Declining soil conditions in many areas as result of excessive drainage, soil subsidence/exposure of acid sulphate soils and problems of flooding and saline intrusion in parts of reclaimed area; severe shortage of drinking water during the dry season; growing depletion of remaining forests within and on fringes of the project area; poor access conditions; and proliferation of pests (rats and pigs mainly). OTHER ENVIRONMENTAL ISSUES: Mobilization of heavy equiment to project sites will damage roads and impede traffic flow in the waterways; construction of water gates on canals used as waterways will interrupt the traffic on the canals, seepage of acidic water from the dikes ( due to the pyrite content of the soil used) would destroy the adjacent vegetation cover. Management of use of pesticides and fertilizers for increasing crop yields on a sustainable basis. PROPOSED ACTIONS: Environmental management plan will be prepared for each subproject area and its monitoring system would be set in place. Proposed,actions to mitigate above environmental issues will include: (a) upgrading and optimal operation of the hydaulic infrastructure in order to control drainage/flood/ saline intrusion,for improving soil conditions and exclusion of unmanageable lands from agricultural use; (b) a major component for provision of safe drinking water; (c) conservation of remaining forests and mangroves through complete restriction on new land clearance and maintenance of buffer zones and restrictions on poaching of timbers; (d) improvement of access to and within the project area; and (e) pest control measures including appropriate 1-30 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS use of pesticides and agro-chemicals. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Proposed.project is given environmental Category A rating as it could, without the planned mitigation measures, have some adverse impacts on the environment in view of the various planned activities including large-scale drainage and flood control, new land development and use -of pesticides. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: EA process was started in June 1991 and draft EA reports for each of the three project sites are being revised following review by the Bank. The EA process is expected to be completed by October 31, 1992. REMARKS: Consultations on the environmental/social impacts of proposed project between Government and local NGOs/representatives of groups which would be affected by the project are underway. The Bank is requesting the government's permission to release EA after it has been revised. 1-31 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDONESIA Project ID No: 41NSPA297 Project : Industrial Efficiency & Pollution Abatement Appraisal Date : Nov. 15, 1992 Total Project Cost: $226.00 Board Date : May 18, 1993 Managing Division : EA3IE Sector: Industry Lending Instrument: Specific Investment Loan Status: Standby Date for receipt of EA by Bank: Date EA Category Assigned: May 28, 1992 MAJOR PROJECT COMPONENTS: Specific project components would include (a) an investment fund for major polluters with emphasis on renovation projects to achieve pollution control objectives; (b) a technical assistance fund for pre-qualified consultants; (c) a technical assistance unit to identify polluting enterprises and monitoring consultants; (d) a hazardous waste treatment facility; and (e) project related activities such as a demonstration wastewater treatment facility for small-scale tanneries; strengthening of environmental analysis and monitoring skills. MAJOR ENVIRONMENTAL ISSUES: Specific environmental issues to be evaluated before project implementation would include the hazardous waste facility and the arrangements for handling EAs for the credit component. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: Not yet determined. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:- This is an environmental project. The hazardous waste treatment facilty may have a significant adverse impact on air pollution, ground water contamination and health. SCHEDULE OF.CATEGORY A ENVIRONMENTAL ASSESSMENT: EA for hazardous waste facility will be accomplished as part of feasibility study due to start in August 1992. REMARKS: TOR for demonstration wastewater treatment plant has been drafted and will be accomplished before appraisal. Both EAs will include required recorded consultations with local inhabitants and NGOs. 1-32 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDONESIA Project ID No: 41NSPA299 Project : Surabaya Urban Development II Appraisal Date : Jun. 15, 1992 Total Project Cost: $496.00 Board Date : Mar. 02, 1993 Managing Division : EA3IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: June 1992 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: Urban roads, water supply and distribution, drainage, solid waste disposal, human waste disposal, KIP, and supporting TA services for city of Surabaya. MAJOR ENVIRONMENTAL ISSUES: (i) Some resettlement/compensation due to road, major stormwater drainage and water distribution construction will be needed: (ii) human waste disposal and sanitation in KIP areas (community upgrading); and (iii) landfill operations for solid waste disposal. OTHER ENVIRONMENTAL ISSUES: (i) Microdrainage problems due to disruption of water drainage system; (ii) disposal of polluted drainage silts and waste water; (iii) air . pollution, noise and traffic due to solid waste collection and disposal activities; and (iv) traffic disruption during construction., PROPOSED ACTIONS: (i) Carry out selective sanitation and stormwater drainage measures and improvements in areas receiving increased water supply; (ii) prepare acceptable resettlement/compensation plans and ensure adherence during implementation; (iii) provide suitable treatment facilities for disposal of stormwater and sewage flows; (iv) implement appropriate systems for solid waste operations and provide necessary equipment and training for environmentally acceptable disposal; (v) provide credit, TA and community facilities for improved sanitation (human waste); and (vi) plan and implement noise and pollution control measures in construction programs. For the actions which cannot be completed during project appraisal, the procedures for implementation would be set out and agreed during negotiations. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Based on the nature of the major environmental issues as summarized above. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: PIL (information report) have been completed. Draft ANDALs (impact analysis) were reviewed by preappraisal mission in Feb. 1992. RKLs (Management Plan) and RPLs (Monitoring Plan) are required for water supply- 1-33 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS' distribution, solid waste and human waste, and would be received and reviewed. prior to appraisal mission scheduled for July 1992. REMARKS: -Borrower has to permit release of EA prior to appraisal and determine date and method of making EA available to affected groups and NGOs.. Project- affected people/businesses have been surveyed to determine compensation/ resettlement needs. 1-34 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDONESIA Project ID No: 41NSPA315 Project : Biodiversity Conservation Appraisal Date : JAN. 08, 1993 Total Project Cost: $35.00 Board Date : Jun. 29, 1993 Managing Division : EA3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date for receipt of EA by Bank: Date EA Category Assigned: MAJOR PROJECT COMPONENTS: The GEF project will consist of two parts: Part A is an Integrated Conservation and Development Project (ICDP) focussing on Kerinci-Sebalt and neighboring areas, and Part B is composed of several smaller supporting initiatives of high priority, as identified under the National Biodiversity Action Plan, including ex-situ conservation, policy studies and conservation awareness creation and education. MAJOR ENVIRONMENTAL ISSUES: Impacts associated with possible resettlement and development activities such as road construction in and near the park. OTHER ENVIRONMENTAL ISSUES: This project will address forest, land and soil degradation and loss of habitats and biodiversity in one of Indonesia's major protected areas (Kerinci Seblat National Park) covering a range of ecosystem types, including lowland tropical forest, through agricultural encroachment, logging, mining, hunting and poor park management. PROPOSED ACTIONS: Although protection of environment and conservation of biodiversity are the principal objectives of the proposed project, environmental impact assessments will need to be carried out with respect to any resettlement required and the various development activities to be included 'in the project. These would be screened, in particular, for their impact on the park. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:- Since the project may include a small component of resettlement, the project has been rated A. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: A preliminary management plan for Kerinci Seblat National Park has been prepared, and boundary revisions and various inventories of communities, flora and fauna in and around the park, as well as spatial and land use planning, are in progress. Full assessment of environmental issues and conditions, and potential impact of project activities, including environmental management and monitoring, have to be further developed during 1-35 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS project preparation. REMARKS: The required environmental assessment studies would be carried out by consultants, with the Bank as executing agency. The ICDP and the conservation awareness program would together address the fundamental issue of how to incorporate local people in planning and implementing biodiversity conservation. In the ICDP, a census currently underway will provide a basis for working out any conflicts bewteen the activities of local inhabitants and the biodiversity conservation and watershed protection functions of the park. Preparation of the ICDP also includes the exploration of possible mechanisms through which local people could particulate in identifying, planning, and implementing project activities. 1-36 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : KOREA Project ID No: 4KORPA120 Project : Seoul Solid Waste Appraisal Date : Jun. 13, 1991 Total Project Cost: $600.00 Board Date : May 12, 1993 Managing Division : EAllN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Standby Date for receipt of EA by Bank: Jun. 10, 1991 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: (a) A sanitary landfill site; (b) Several transfer stations; (c) Associated access road; and (d) Associated vehicles and rolling stock. MAJOR ENVIRONMENTAL ISSUES: (a) Potential air, land and water pollution and aesthetic nuisances at the disposal site; (b) change in utilization of land at disposal site; and (c) transportation of solid waste from transfer stations to disposal site. OTHER ENVIRONMENTAL ISSUES: (a) Change in land use and in air noise pollution impacts as a consequence of transport investments; and (b) closure and maintenance of existing dump site. PROPOSED ACTIONS: In order to mitigate issues described above, environmental impact assessments (EIA) have been completed for land fill site, the access road and the transfer stations. They have been reviewed by Bank missions and found satisfactory. Mitigating measures assessed as necessary in the EIAs have been addressed in designs. The Bank has also reviewed Seoul Metropolitan Government's (SMG) Terms of Reference for a feasibility study to close the existing dump and advised SMG on the emphasis of the study. SMG has explained procedures for addressing the situation of scavengers as the existing dump is closed and the Bank has requested additional information. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Risk of river and sea pollution. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: As discussed above, the Bank has reviewed the three EIAs undertaken for the various components of this project and found them satisfactory. REMARKS: Advice has just been received from SMG thay they wish to restructure the proposed project. Details of the proposed changes have been requested. Following receipt, an assessment will be made as to whether the proposed changes can be supported and whether the change would require a new environmental assessment. 1-37 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country. : KOREA Project ID No: 4KORPA168 Project : Petroleum Distribution and Sector Improvement Appraisal Date : Jun. 30, 1992 Total Project Cost: $800.00 Board Date : Mar. 09, 1993 Managing Division : EAlIE Sector: Energy Lending Instrument: Specific Investment Loan Status: Standby Date for receipt of EA by Bank: Under revision Date EA Category Assigned: Mar. 13, 1992 MAJOR PROJECT COMPONENTS: The project consists of petroleum products pipeline network, in varying sizes ranging from 10 to 24 inches in diameter, with approximate length of 1,000 km. The network also includes pump stations, petroleum storage tanks, pipeline communication facilities and loading and unloading terminals. MAJOR ENVIRONMENTAL ISSUES: Atmospheric emissions of hydrocarbons; rivers and underground water contamination from routine operation and during accidents; risk to the public during accidents mainly at tanks farms and loading terminals; negative impacts on natural resources, archeology and tourism; resettlement; social impacts at terminals due to high traffic volume. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: (a) Use strict, internationally accepted standards for engineering, construction and operation of the system; (b) incorporate the results and recommendations of the EA into the engineering of the system; and (c) consult affected groups. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A- ENVIRONMENTAL ASSESSMENT: The borrower has prepared an Environmental Assessment Report, and submitted it to the Bank for its review and comments. The Bank has transmitted some of its preliminary comments to the borrower, to bring it in line with OD 4.01 requirements. REMARKS: Environmental and safety benefits: (a) reduce marine pollution resulting from oil- leakages during operation and accidents when using sea transport; and (b) reduce rail and road hazards by minimizing land. transportation. 1-38 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : MALAYSIA Project ID No: 4MAYPA107 Project : Drainage & Flood Mitigation. Appraisal Date : Sep. 15, 1993 Total Project Cost: $90.00 Board Date : Jun. 14, 1994 Managing Division : EA1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date for receipt of EA by Bank: Date EA Category Assigned: 11/13/91 MAJOR PROJECT COMPONENTS: Drainage and flood alleviation works and related agricultural development in some 5-8 schemes through Malaysia. The project also includes a pilot scheme for the reclamation of tin mine areas in the state of Perak. MAJOR ENVIRONMENTAL ISSUES: As required by Malaysian law, EIAs have been completed for the two most critical schemes (Tumboh Block and Briah). The EIA reports identified likely adverse impacts regarding the use of agro-chemicals, land reclamation and loss or endangerment of biologiqal resources. The reports make specific recommendations including conservation of some critical areas deemed necessary to maintain a continuum of wetland, reverine dry land and forest development. Other schemes are not expected to pose major problems. The tin mine reclamation pilot scheme is expected to bring aobut positive environmental results. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: The Government has been requested to supplement the EIAs with specific environmental management plans to implement the proposed mitigation measures. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: This project is categorized as an A in view of the potential adverse impacts derived from the Tumboh and Briah schemes. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: GOM requires the preparation of EIAs for all agricultural projects. EIAs have been completed for two subprojects. Other assessments are in preparation and are expected to be completed in mid-1992. REMARKS: None. 1-39 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : MALAYSIA Project ID No: 4MAYPA110 Project : Sarawak Roads Appraisal Date : Apr. 01, 1993 Total Project Cost: $50.00 Board Date : Mar. 15, 1994 Managing Division : EAlIN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: June 1992 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: The project consists of upgrading of trunk and feeder roads (135 km) and construction of a new road (25 km) through tropical lowland forest; improvement of drainage and pavements; axle load control program; technical assistance to" enhance project planning, management and supervision capabilities of the Sarawak Public Works Department; and improving road maintenance management capabilities. MAJOR ENVIRONMENTAL ISSUES: - New road construction; - Conversion of tropical forests; - Drainage; - Resettlement and Rehabilitation; - Land use options. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: A detailed Environmental Assessment will be undertaken to determine the impact of the project in the area. Particular attention will be paid to the tropical forest, resettlement and rehabilitation of any people displaced as a result of the proposed new road construction. 'Appropriate mitigation actions to minimize adverse effects to the environment and appropriate actions for Resettlement and Rehabilitation will be included in the project, for implementation. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The proposed project includes new construction in an environmentally sensitive forested area with populations of indigenous people. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The preparation of the Environmental Assessment and Resettlement and . Rehabilitation plans in line with proposed actions will be undertaken by Consultants financed by the Japanese Grant Facility to Malaysia. Terms of Reference for the EA have been submitted by Government and reviewed by the Bank. Detailed comments have been provided to Government and a final review of the TORs will be carried- out once revisions have been made. A short list 1-40 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS has been prepared and Bank comments provided. Letters of invitation are expected to be issued shortly. The study will be undertaken under the supervision of the Economic Planning Unit and the Sarawak Public Works Department. REMARKS: None. KI 1-41 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A"'PROJECTS Country : PHILIPPINES Project ID No: 4PHLPA196 Project : Metro Manila Solid Waste Management Appraisal Date : Nov. 16, 1992 Total Project Cost: $115.00 Board Date : Jun. 08, 1993 Managing Division : EAIIN - Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Completed Date EA Category Assigned: June 11, 1992 MAJOR PROJECT COMPONENTS: The proposed project would include: (a) development of two sanitary land fill sites; (b) construction of four transfer stations; (c) procurement of long haul equipment and equipment for landfills; (d) rehabilitation of equipment maintenance workshops; and (e) technical assistance (consultancies). MAJOR ENVIRONMENTAL ISSUES: The project would face the environmental issue of leachate from the landfills and possibility of groundwater pollution. OTHER ENVIRONMENTAL ISSUES: (a) Gas from proposed landfill and existing dumps to be closed; (b) windborne smells and fugitive waste from the landfills and transfer stations and from trucks in transit; and (c) noise, litter, exhaust fumes and other nuisances from the transfer truck movement. PROPOSED ACTIONSi The consultants engaged for the design of landfill and transfer stations have as part of their terms of reference undertaken an Environmental Assessment of each of the facilities. The terms of reference have been developed by an external solid waste specialist. The Bank will engage solid waste specialists to advise the Government and the local consultants during the design period and for review of the proposals. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Project will address solid wastes problem of Metro Manila. Earlier it was assigned D category and thus grandfathered for EA. However, in the revised rating system, it has been classifed category A thus EAs will be done to cover project components, risk of ground water and river/stream pollution. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The Government has conducted an environmental assessment of the proposed landfill sites during site election. The Bank has reviewed all 3 Environmental Impact Statements (EIS) and forwarded comments to MMA. The EIS for the first Transfer Station was found very satisfactory. The landfill consultant has still to design the leachate treatment-works. 1-42 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS REMARKS: A large majority of residents within 1 km radius of the 2 landfills and the let Transfer Station were interviewed. Public hearings were held with public leaders and,residents' representatives regarding the Transfer Station July to September 1991. No public hearing yet fixed regarding the two landfills. 1-43 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : THAILAND Project ID No: 4THLPA118 Project : Gas Transmission Appraisal Date : Dec. 09, 1991 Total Project Cost: $448.00 Board Date : Aug. 04, 1992 Managing Division : EAlIE Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of.EA by Bank: Completed Date EA Category Assigned: MAJOR PROJECT COMPONENTS: The project consists of (a) 32" diameter, 175 km long; and 24" diameter, 160 km long submarine pipeline for transmission of natural gas to onshore facilities; and (b) expansion of Supervisory Control and Data Acquisition (SCADA) System. MAJOR ENVIRONMENTAL ISSUES: Pipelines under this project will carry non-associated gas and therefore, have much lesser degree of environmental risk than would be the case with oil or associated gas. The potential environmental issues are (a) disruption of marine life which may be caused by the changes in the seabed conditions in the vicinity of the pipes during the pipe laying period; (b) discharge of liquids (produced water, sewage and drainage) from production platforms; (c) noise and vibration caused by equipment on the production platform; (d) disposal of mercury present in the gas; (e) lack of safety and environmental standards in PTT; and (f) lack of environmental regulations, by DMR, for offshore exploration and production. PTT's operational safety record is excellent. The site of production is about 200 km from any onshore location. Pipeline construction will conform to international standards of safety. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: Set up a mitigation plan that will include among others: (a) correction of adverse effect during construction; and (b) develop safety and environmental standards for PTT and DMR. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: N/A SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The EIA report has been prepared by Team Consulting Co., on behalf of Bechtel/Lavalin, who are the primary consultants to PTT. Prior to the preparation of the EIA, the pre-appraisal mission discussed the terms of 1-44 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS reference with PTT and the consultants, and it was agreed that additional points raised by the Bank would be included in the study. The Consultants have completed the EIA and submitted it to the Bank for comments. The Bank's comments have been taken into account and the final report has been prepared accordingly. REMARKS: None. 1-45, ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : THAILAND Project ID No: 4THLPA145 Project : Industrial Pollution Control Appraisal Date Feb. 01, 1993 Total Project Cost: $90.00 Board Date : Sep. 28, 1993 Managing Division : EAlIE Sector: Industry Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Sep. 1992 Date EA Category Assigned: Apr. 1992 MAJOR PROJECT COMPONENTS: The proposed project would have four components: (i) construction of central industrial waste treatment facilities for areas with high concentration of chemical and related industries, including Suksawat and Rangsit; (ii) completion of final engineering and construction of another two treatment systems to be selected among the prefeasbility studies being prepared for Poochao, Samingprai, Teparak, Krathumban and Sampran; (iii) construction of collection, treatment and disposal systems for toxic/hazardous waste at Chonburi and Rachaburi, (iv) funding of waste reduction and pollution abatement schemes for individual industries; (v) training in industrial pollution and environmental management; and (vi) technical assistance to review the institutional management and financial framework of the sector, including the purchase of monitoring and sampling equipment. MAJOR ENVIRONMENTAL ISSUES: The project would reduce significant industrial pollution, which is a serious and rapidly growing problem in the project areas. However, unless some concessional financing is provided by foreign donors, the project approval, its implementation and its benefits may suffer considerable delays. Additional issues include: (i) adequate legal and institutional framework; (ii) adequate system for cost recovery, at least for operation; (iii) project design to avoid or reduce environmental damage; and (iv) the inclusion of the transhipment of toxic waste in the port of Bangkok (which is a contentious issue), is also important, but its priority and the preparation of engineering studies is to be discussed with Government. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: Consultants are being hired to prepare the feasibility and final engineering for the project. After basic design is established an EA will be completed. Any environmental problems identified will be incorporated in the final design. Other actions regarding issues already identified include: (i) to ensure that the legal and institutional framework is adequate, a DANIDA -grant of $700,000 is proposed to finance studies and technical assistance to DIW and the NEB. These studies will be completed by mid-1993; (ii) adequate cost recovery for operation and part of the capital expenditures is needed to ensure the project sustainability. For this purpose the feasibility/final engineering study will provide recommendations, which are expected to 1-46 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS be similar to the ongoing pollution charges implemented for the 11 Industrial' Estates, where pollution fees are based on the BOD and volume of waste; (iii) the location of the treatment facilities, the type of treatment, the odor and atmospheric emission, the final sludge disposal, etc. will require attention during the engineering studies to prevent or mitigate potential environmental damage. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The contracts for the final feasibility and subsequent final design were signed on April 1992 (being financed by a Japanese Grant). The consultants will prepare an EA for review by the Bank and DIW at the completion of the final feasibility stage before the initiation of the final design (expected by September 1992). REMARKS: Bank preparation missions, and the support of an environmental professional in the Resident Mission would supervise the project preparation and the consultants' study. 1-47 ENVIRONMENTAL.DATA SHEET FOR CATEGORY "A" PROJECTS Country : EGYPT Project ID No: 5EGTPA184 Project : Power Sector Investment Appraisal Date, : May 25, 1993 Total Project Cost: $300.00 Board Date : Jun. 14, 1994 Managing Division : MN2IE .Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: January 1993 (tentative) Date EA Category Assigned: May 12, 1992 MAJOR PROJECT COMPONENTS: I - Supply and Installation of a 600 MW Thermal power station; II - Installation of transmission lines and substations (including line loss reducing equipment); and III- Technical Assistance. MAJOR ENVIRONMENTAL ISSUES: Land acquisition and resettlement; SOx, NOx and particulate emissions, ambient air and water quality. OTHER ENVIRONMENTAL ISSUES: Screening of gas pipeline and transmission line corridors. PROPOSED ACTIONS: To be developed during preparation of Environmental Impact Assessment Report. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Installation of a major thermal power station with the associated transmission lines, substations and natural gas pipeline. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: To be developed after return of supervision mission in July 1992. REMARKS: To be developed. 1-48 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS* Country : IRAN Project ID No: 5IRNPA041 Project : Power Sector Efficiency Appraisal Date : JAN. 16, 1992 Total Project Cost: $1,021.00 Board Date : Sep. 01, 1992 Managing Division : MN2IE Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: April 1992 Date EA Category Assigned: March 26, 1992 MAJOR PROJECT COMPONENTS: The project will involve five main components: (1) construction of a new 800 MW gas turbine power plant in Tabriz, (2) conversion of a 400 MW simple cycle plant to 600 MW combined cycle plant at Qom, (3) rehabilitation and upgradation of the 520 MW Dez hydro electric plant, (4) rehabilitation and upgradation of the 1000 MW Karun I hydro electric plant, and (5) technical assistance component consisting of studies, and training. MAJOR ENVIRONMENTAL ISSUES: Air quality, particularly NOx at Tabriz. OTHER ENVIRONMENTAL ISSUES: Water quality and conservation at Qom. PROPOSED ACTIONS: The proposed gas turbine plant is expected to be efficient and have a minimal air pollution impact because of the characteristics of the fuel proposed (natural gas). In addition, low-NOx burners (<50 ppm) will be specified. - Monitoring of air quality at site or from the local meteorological station will ensure compliance with the Iranian Environmental Protection Organization (whose guidelines follow the regulations of Environmental Protection Agency of USA). - Usage of water for the Qom combined plant is limited due to the dry cooling system (air-cooled condensers) that will be installed. However, water will be chemically treated to ensure compliance within safe limits. Landscaping needs will be minimized by using indigenous vegetation. - Safety inspection of the dams is being carried out periodically through the help of international consulting engineers. Continuance of this exercise will be stressed. - Maintenance of noise limits are not expected to pose a problem. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Only one of the four components, Tabriz, qualifies for "A" rating. However, following revised OD 4.01, the whole project is being classified as "A" for EA purposes. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: 1-49 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS EA starting date: October 1991 EA first draft: March 27, 1992 REMARKS: Draft environmental assessment reports reports are available,for Tabriz, Qom and, the hydro electric plants at Dez and Karun.The Bank's Environmental Mitigation or Environmental Management Plan and Environmental Guidelines have been provided to the consultant engineers to ensure 'that their feasibility report complies with the same. Relevant sections from the Iranian Environmental Protection Organization (IEPO) guidelines are being translated for Bank's reference. The Bank mission has been informed that the guidelines of the IEPO are based on the Environmental Protection Agency (EPA) in the USA. 1-50 ENVIRONMENTAL DATA SHEET FOR CATEGORY,"A" PROJECTS Country : IRAN Project ID No: 5IRNPA046 Project : Railway/Ports Appraisal Date : JAN. 06, 1993 Total Project Cost: $600.00 Board Date : Jul. 06, 1993 Managing Division : MN2IN Sector: Transportation -Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Date EA Category Assigned: June 01, 1992 MAJOR PROJECT COMPONENTS: Improve capacity and efficiency of ports and railways by constructing a railway line and provision of port equipment. MAJOR ENVIRONMENTAL ISSUES: None. OTHER ENVIRONMENTAL ISSUES: Railroad track alignment would require a review by the Antiquities Department. PROPOSED ACTIONS: Environmental impact study will be carried out during preparation. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL -CATEGORY: Environmental impacts are expected to be minimal, since the railway passes through sparsely populated semi-desert areas; and ports' operations will be improved by the provision of equipment and thus reduce long duration queues. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: E.A. start-up end of July 1992. REMARKS: None. 1-51 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : IRAN Project ID No: 5IRNPA050 Project : Tehran Sewerage Appraisal Date : Nov. 18, 1992 Total Project Cost: $650.00 Board Date : May 18, 1993 Managing Division : MN2IN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Standby Date for receipt of EA by Bank: Feb. 1992 Date EA Category Assigned: Nov. 18, 1991 MAJOR PROJECT COMPONENTS: Provision of sewerage system for Tehran including collection, treatment, and effluent reuse systems. MAJOR ENVIRONMENTAL ISSUES: No major environmental issues are foreseen. Those normally associated with sewerage and effluent reuse will be addressed through proper design. OTHER ENVIRONMENTAL ISSUES: Those normally associated with construction. PROPOSED ACTIONS: Environmental assessment under preparation, to be completed by July 1992. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The large size of treatment plant and effluents are the main reasons for the EA category "A". SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Draft EA report would be reviewed during June 1992 mission. REMARKS: None. 1-52 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : IRAN Project ID No: 5IRNPA052 Project : Gas Development Appraisal Date : Oct. 20, 1992 Total Project Cost: $1,000.00 Board Date : May 25, 1993 Managing Division : MN2IE Sector: Energy Lending Instrument: Specific Investment Loan Status: Standby Date for receipt of EA by Bank: Sep. 1, 1992 Date EA Category Assigned: Mar. 1992 MAJOR PROJECT COMPONENTS: Gathering and processing of flared associated gas and technical assistance for development of gas sector. MAJOR ENVIRONMENTAL ISSUES: None. OTHER ENVIRONMENTAL ISSUES: Risks of offshore pollution, pipeline failure, other facility accidents. PROPOSED ACTIONS: Due attention in the design and operation of project facilities. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: A - to comply with current Bank procedures. EA under preparation by implementing agency. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: EA under preparation to be completed by September 01, 1992. REMARKS: None. 1-53 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : MOROCCO Project ID No: 5MYCPA162 Project : Gas Development II Appraisal Date : Oct. 03, 1993 Total Project Cost: $150.00 Board Date : May 08, 1994 Managing Division : HN1IE Sector: Energy Lending Instrument: Specific Investment Loan Status: Standby Date for receipt of EA by Bank: To be developed Date EA Category Assigned: Jun. 18, 1992 MAJOR PROJECT COMPONENTS: Assistance to creating the institutional framework of the gas sector. Installation of a transmission and distribution network to supply natural gas to power stations and major industrial consumers. Installation of a telecommunication system and various equipment. Technical Assistance and Training. MAJOR ENVIRONMENTAL ISSUES: The mechanisms for environmental assessments and clearances for the project will be defined prior to and during appraisal. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: N/A JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Introduction of gas in Moroccan market would replace polluting fuels (fuel oil, coal) and reduce Co2 emissions. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: To be developed. REMARKS: None. 1-54 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : ARGENTINA Project ID No: 6ARGPA116 Project : Yacyreta II Appraisal Date : Mar.,16, 1992 Total Project Cost: $2,890.00 Board Date : Aug. 25, 1992 Managing Division : LA4IE Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Jan. 28, 1992 Date EA Category Assigned: Sep. 25, 1991 MAJOR PROJECT COMPONENTS: (1) Yacyreta hydroelectric- dam civil works and engineering; (2) first phase of the transmission system; and (3) T.A. for design and implementation of the Plan of Action for Resettlement and Environmental Management. MAJOR ENVIRONMENTAL ISSUES: Impact of the large Yacyreta reservoir on the population and environment, including loss of wildland ecosystems, involuntary resettlement, and water quality problems. OTHER ENVIRONMENTAL ISSUES: Effects of migratory fish and other aquatic life, inundation of cultural properties, potentially increased public health risks. PROPOSED ACTIONS: Continued monitoring of actions agreed in the Electric Power Sector Project (Loan 2998-AR). Additional mitigatory measures have been identified in the EA study and included in the updated version of the P.A. for R&EM JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Category A is appropriate for a large hydroelectric dam project. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The EA executive summary was circulated to EDs on May 21, 1992. REMARKS: EBY has held meetings with NGOs. The outcome of these meetings will be reflected in an Annex to the EA. 1-55 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : BRAZIL Project ID No: 6BRAPA327 Project : Water Pollution Control - Minas Gerais Appraisal Date : Jun. 29, 1992 Total Project Cost: $350.00 Board Date : Nov. 17, 1992 Managing Division : LAlIN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Apr. 30, 1992 Date EA Category Assigned: June 19, 1992 MAJOR PROJECT COMPONENTS: Self-sustained investment project in the most congested areas of Brazil to develop methodologies to tackle the cleaning of environment. MAJOR ENVIRONMENTAL ISSUES: Save the scarce water resources for human consumption and agriculture. OTHER ENVIRONMENTAL ISSUES: Contribute to the development of institutional capacity to create water management agencies. PROPOSED ACTIONS: - invest in infrastructure - agree on instruments to recover costs and finance water agency. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Resettlement and public health. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Final EA April 30, 1992. REMARKS: None. 1-56 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : BRAZIL Project ID No: 6BRAPA328 Project : Water Pollution Control - Sao Paulo/Parana Appraisal Date : Feb. 17,-1992 Total Project Cost: $463.00 Board Date : Jun. 25, 1992 Managing Division : LAllN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Apr. 17, 1992 Date EA Category Assigned: Jan. 21, 1992 MAJOR PROJECT COMPONENTS: Self-sustained investment project in the most congested areas of Brazil to develop methodologies to tackle the cleaning of environment. MAJOR ENVIRONMENTAL ISSUES: Save the scarce water resources for human consumption and agriculture. OTHER ENVIRONMENTAL ISSUES: Contribute to the development of institutional capacity to create water management agencies. PROPOSED ACTIONS: - invest in infrastructure - agree on instruments to recover costs and finance water agency. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Resettlement and public health. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Final EA - April 17, 1992. REMARKS: None. 1-57 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHILE Project ID No: 6CHLPA036 Project : Irrigation Development Appraisal Date : Mar. 23, 1992 Total Project Cost: $120.00 Board Date : Mar. 16, 1993 Managing Division : LA4AG Sector: Agriculture & Rural Devt Lending Instrument: Sector Investment and Maintenance Status: Lending Date for receipt of EA by Bank: Sep. 1991 Date EA Category Assigned: Apr. 20, 1988 MAJOR PROJECT COMPONENTS: Public investment in rehabilitation, modernization and construction of small and medium-sized irrigation schemes. - Enhanced implementation of,the Irrigation Development Law which supports private investment in small scale and on-farm works. - Support to strengthen user associations in operating and maintaining irrigation schemes. - Strengthening, as appropriate, public agencies involved in irrigation, including their capacity to assess and mitigate for dealing with these issues. MAJOR ENVIRONMENTAL ISSUES: The draft sectoral EA has identified a series of potential problems associated with irrigation, including salinity and drainage problems, water quality and agro-chemical contamination, displacement of population by reservoirs and threats to biodiversity in newly-irrigated areas. Further, these aspects will be conditioned by broader long-run issues of intersectoral conflicts over land and water use. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: The project would ensure that the above issues are dealt with a rational and systematic fashion in the course of subproject analysis and selection, with participation by beneficiaries and affected groups. Cost recovery and strengthening of user groups would also contribute to improved use efficiency and water conservation. These groups would also be involved in monitoring water quality. Finally, long-run multiple water use planning would be addressed in river basin studies. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Project would include various sub-projects with different degrees of environmental impact. Some sub-projects could be classified as an A for purposes of EIA, therefore entire operation is considered an A project. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: 1-58 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS A first draft of the sectoral EA was reviewed in September by LATEN and LA4AG. The draft was also presented to and discussed with several local non-governmental organizations working in issues of the environment and rural development. In March 1992, a revised draft was sent to the Bank and an executive summary forwarded to the Board. REMARKS: A draft of the summary (in Spanish) was circulated to numerous local non-governmental organizations (NGOs) involved in environmental issues and rural development in Chile, who were invited to participate in a meeting under the auspices of the Ministry of Planning (MIDEPLAN) to discuss and comment on the issues raised. The summary was sent to the- following NGOs: Consultorias Profesionales Agraria Ltda. (AGRARIA), Comite Nacional de Pro Defensa de la Fauna y Flora (CODEFF), Centro de Investigacion y Planificacion del Medio Ambiente (CIPMA), Grupo de Investigaciones Agrarias (GIA), Instituto de Ecologia Politica (IEP), Instituto de Educacion Rural (IER), and Instituto de Promocion Agraria (INPROA); the meeting was attended by CODEFF, INPROA, IER and AGRARIA on December 3, 1991 in the office of MIDEPLAN. Profiles of potential investments under the project will be circulated to interested local NGOs and affected groups during March-April for comments. 1-59 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : JAMAICA Project ID No: 6JAMPAO69 Project : Water Supply and Sewerage Appraisal Date : May 15, 1993 Total Project Cost: $55.00 Board Date : Jan. 15, 1994 Managing Division : LA3IN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Date EA Category Assigned: Mar. 18, 1992 MAJOR PROJECT COMPONENTS: Sewage collection, treatment and disposal for Kingston metro area; solid waste management; pollution monitoring programs. MAJOR ENVIRONMENTAL ISSUES: Pollution in Kingston Harbor caused by untreated sewage discharges; leachate intrusion into the Harbor from solid waste dump sites and non-point sources of pollution (stormwater runoffs, etc.) OTHER ENVIRONMENTAL ISSUES:. N/A PROPOSED ACTIONS: 12-month feasibility study commenced in November 1991 aimed at quantifying pollutional loads, and prescribing solutions to alleviate problems; proposed project will be based on recommendations of this study. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The project will be aimed at controlling pollution (waste-related) in the Kingston Harbor; it will impact on several subsectors (improved sewage, drainage, solid waste, etc.) for the Kingston area. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: EA will be prepared as part of the feasibility study; starting date - Dec. 1991; First Draft - Aug. 1992. REMARKS: None. 1-60 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : JAMAICA Project ID.No: 6JAMPAO74 Project : Energy Sector Deregulation and Privatization Appraisal Date : Feb. 24, 1992 Total Project Cost: .$275.00 Board Date : Jun. 25, 1992 Managing Division : LA3TF Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Date EA Category Assigned: Apr. 1992 MAJOR PROJECT COMPONENTS: (a) Installation of 120 MW of power generating capacity, of which 90 MW in the private sector and 30 MW in public sector; (b) installation of required transmission facilities; and (c) technical assistance. MAJOR ENVIRONMENTAL ISSUES: EAs were carried out for: (a) 60 MW privately owned diesel plant at Rockfort in Kingston; and (b) 60 MW combustion turbine plant (30 MW in public sector and 30 MW in private sector) at Hunts Bay in Kingston. For the diesel plant, major environmental issues include impacts on air quality, resulting from NOx and S02 emissions and possible impacts of fuel transport to the plant. Mode of fuel transport to be determined by private owner, once owner has been selected by Government of Jamaica. Private owner would be required to undertake environmental assessment of fuel, transport. No major environmental impacts were identified for the proposed 60 MW combustion turbine plant. However, environmental impacts from existing power generating facilities located next to the proposed site at Hunts'sBay which require mitigation measures were identified in draft EA for proposed plant. These include possible site contamination of the existing and proposed site, and NOx and S02 emissions from existing facilities. An EA satisfactory to the Bank for the second privately owned facility (30 MW plant) would be required from the private owner. OTHER ENVIRONMENTAL ISSUES: Impacts of transmission facilities to be constructed under proposed project. IDB has undertaken an environmental assessment of proposed transmission facilities and mitigation measures recommended in this study would be incorporated into design by the borrower. PROPOSED ACTIONS: For 60 MW diesel plant: to mitigate air quality impacts, use of low sulphur ful (2.2%) to reduce S02 impacts and engine modification to reduce NOx impacts. For fuel transport impact, alternative modes are being investigated. If truck transport from local refinery is chosen, mitigation measures would include planning time and route of deliveries and construction of access roads and turn off lanes to facilitate delivery to minimize impacts of fuel transport. For the existing facilities at Hunts Bay, use of lower sulphur fuel (2.5%) than is presently used as well as retirement of existing steam units to reduce S02 impacts. A detailed and monitorable mitigation plan would be agreed with Government of Jamaica under the proposed project to 1-61 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS address environmental impacts from existing facilities and clean up of contaminated areas at the Hunts Bay site, including the site for the proposed 60 MW combustion turbine plant. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: 90 MW of proposed power plant capacity expansions are private sector operations, to be financed by the Bank through Government of Jamaica intermediary, where private owners of plant would be required to meet Bank environmental guidelines to access Bank financing; public sector component (30 MW of combustion turbine plant) added to request of Government of Jamaica in February, 1992 is category "A" component. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Draft EA for 60 MW combustion turbine power plant completed in April 1992; final draft expected by erly June 1992. REMARKS: IDB - financed studies underway or completed: environmental audit of existing public sector power facilities at Hunts Bay and the site proposed for combustion turbine plant to be completed by early June, 1992; environmental assessment of proposed transmission facilities has been completed. Borrower has accepted analysis and recommended mitigation measures of EA for 60 MW combustion turbine facility, which includes the public sector component to be financed under the proposed project. 1-62 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : MEXICO Project ID No: 6MXCPA111 Project : Rainfed Areas Development Appraisal Date : Jun. 15, 1993 Total Project Cost: $400.00 Board Date : Feb. 15, 1994 Managing Division : LA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Date EA Category Assigned: Mar. 16, 1992 MAJOR PROJECT COMPONENTS: (i) Tropical land development: (a) drainage; (b) irrigation; (c) land clearing; (ii) Rural development: (a) stores; (b) roads, and (iii) agricultural research and extension. MAJOR ENVIRONMENTAL ISSUES: Impact of tropical land development on sustainable productivity. OTHER ENVIRONMENTAL ISSUES: Fertilizer use PROPOSED ACTIONS: Adequate design, execution, and maintenance of works JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The project will encompass a group of subprojects in the tropical southern part of Mexico. These subprojects will comprise grazing areas but also areas of rain forests that will be subject to clearing of vegetation. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Ongoing in Project Tropical Agriculture II (Loan 2658-ME). REMARKS: None. 1-63 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : PARAGUAY Project ID No: 6PARPAO71. Project : Natural Resource Management I Appraisal Date : Jun. 08, 1992 Total Project Cost: $60.00 Board Date : Jan. 15, 1993 Managing Division : LA4AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: June 1992 Date EA Category Assigned: April 20, 1990 MAJOR PROJECT COMPONENTS: Regional agricultural development in the Departments of Alto Parana and Itapua (norte) including consolidation of settlements, infrastructure, agricultural services, environmental protection and institutional strengthening. MAJOR ENVIRONMENTAL ISSUES: Deforestation for agricultural purposes, without proper land use planning or use of proper soil conservation technology;, indigenous communities; increasing population pressures on land resources. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: Detailed design of watershed management and resource conservation to be undertaken using PHRD grant .during the late stages of project preparation. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Important environmental issues, which can.be dealt with directly in the project's design. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The EA preparation process was discussed with the borrower during the pre-appraisal mission (Feb 11-29, 1992). Completion of draft estimated for Mid-June 1992. REMARKS: The arrangements for making available the EA to affected groups of NGOs have not yet been defined. 1-64 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : PERU Project ID No: 6PERPA123 Project : Lima Water Sector Restructuring & Rehab. Appraisal Date : Nov. 30, 1992 Total Project Cost: $200.00 Board Date : Jun. 15, 1993 Managing Division : LAllN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Standby Date for receipt of EA by Bank: 2nd quarter 1993 Date EA Category Assigned: June 11, 1992 MAJOR PROJECT COMPONENTS: An institutional component to help finance sector restructuring, technical assistance, and training; and an investment component to help finance rehabilitation of critically damaged infrastructure, infrastructure for safe disposal of sewage into the ocean, and service quality improvement. MAJOR ENVIRONMENTAL ISSUES: The two major environmental problems are: (i) the direct discharge of cholera contaminated'sewage on Lima's seashore; and (ii) the exhaustion and contamination of Lima's ground water aquifer. OTHER ENVIRONMENTAL ISSUES: Mining activities waste and cholera contaminated sewage is being currently poured into the Rimac River, upstream from Lima's water treatment plant. PROPOSED ACTIONS: The construction of submarine outfalls is being proposed as the most-efficient action to solve the current discharge of sewage on Lima's seashore. Potential environmental problems will be thoroughly studied and mitigation measures proposed. An environmental assessment of the proposed submarine outfalls will be carried out by March 31, 1993. Rehabilitation of sewage collectors will help prevent cholera's propagation. Ground water extraction will be metered and a water tariff or charge, reflecting water's opportunity cost, will be approved. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: No major adverse environmental problems are envisaged. Potential problems could only appear related to the construction of the submarine outfalls and, if this is the case, they will be mitigated through appropriate engineering practices. Contamination of the Rimac River will be properly evaluated and a mitigation program proposed. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: To be developed. REMARKS: None. 1-65 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CZECHOS. Project ID No: 7CZKPA010 Project : Energy II Appraisal Date : Jul. 01, 1993 Total Project Cost: $200.00 Board Date : Nov. 02, 1993 Managing Division : EC2EE Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Date EA Category Assigned: MAJOR PROJECT COMPONENTS: In early stages of preparation, but the project may include one or more of following components: a) gas pipeline to enhance country's supply system; b) increase in gas storage capacity; c) TA. MAJOR ENVIRONMENTAL ISSUES: Pipeline route is to follow existing pipelines in operation, issues of disruption to physical and social infrastructure expected to be minimal but, need evaluation; impact of reduced gas emissions on global environment. environment. OTHER ENVIRONMENTAL ISSUES: To be identified as project definition becomes firmer. PROPOSED ACTIONS: To carry out environmental assessment in parallel with preparation. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Construction or rehabilitation of gas infrastructure must meet safety and security aspects. (Category could be changed to B depending on which exact project components are included, for example if pipeline component is ultimately dropped or for other reasons.) SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: EA to be started in June/July 1992. REMARKS: None. 1-66 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CZECHOS. Project ID No: 7CZKPA011 Project : Environment I Appraisal Date : Sep. 08, 1992 Total Project Cost: $150.00 Board Date : Jul. 28, 1993 Managing Division : EC2EE Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: June 1992 June 1992 Date EA Category Assigned: Mar. 1991 MAJOR PROJECT COMPONENTS: 1. Municipal services (water, sewerage and solid waste) in 8 cities. 2. Hazardous waste incineration in two locations. 3. Mining reclamation program. 4. Activities to implement environmental master plans in Northern Bohemia and Northern Moravia. 5. Institutional strengthening and technical assistance, including feasibility studies for next project. MAJOR ENVIRONMENTAL ISSUES: Siting and design of hazardous waste disposal (incineration) facilities. OTHER ENVIRONMENTAL ISSUES: Design of municipal wastewater treatment plants to meet receiving water standards. PROPOSED ACTIONS: Hazardous waste component will require full EA prior to appraisal. Wastewater treatment plants (and possibly other investments under components 3, 4, and 5, not yet identified) will require adherence to internationally accepted standards. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Potential dangers from hazardous waste disposal, especially under abnormal or emergency conditions, are inherently high and public awareness is low; this component is clearly "A" category. If this component is dropped or deferred, the project would revert to a "B" rating. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Procedures for undertaking EA work, including the need for public participation, have been discussed with component sponsors and Terms of Reference agreed. Consultants, under an EC/PHARE grant are being selected. Provided field work begins in late-1991, a draft report should be ready by the scheduled appraisal date to be determined. A more elaborate EA is required for the Czech Republic facility because the present site is probably not acceptable. REMARKS: 1-67 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Borrower has been advised of the need to release EA. A formal reply is awaited but is not expected to be a problem. 1-68 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : HUNGARY Project ID No: 7HUNPA045, Project : Energy/Environment Appraisal Date : Sep. 15, 1992 Total Project Cost: $150.00 Board Date : Jul. 26, 1993 Managing Division : EC2EE Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Under Discussion Date EA Category Assigned: MAJOR PROJECT COMPONENTS: The project involves: (i) the construction of one or two gas fired combined cycle co-generation plants; (ii) strengthening through the upgrading of MVM's (the Hungarian Electricity Company) Energy Management System (EMS) at the National Despatch Center and Regional Despatch Centers; (iii) technical assistance to upgrade the human resources management, training and generally the institution building capacity in the power sector; and (iv) assistance to reinforce the environmental management and monitoring capability in the sector through development of a master plan (including implementation of the accepted recommendations) and air quality monitoring program and related training. MAJOR ENVIRONMENTAL ISSUES: (a) Atmospheric emissions and standards compliance at the power stations; (b) noise; and (c) disturbances to the terrain and properties traversed by the pipeline. Considerable uncertainty exists regarding legal procedures to obtain formal licenses for constructing projects such as under consideration. The process includes approvals for environmental measures, some from municipalities, others from state government authorities. Due to the current situation some administrative problems are expected. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: Environmental assessment is proposed for component (i). JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Environmental assessment of component (i) is to be included in the feasibility studies; draft report taking into account some of the preliminary comments of the Bank and detailed comments from MVM are expected by mid-July 1992. Details of EA requirements were discussed in detail during May-June mission. 1-69 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS REMARKS: None. 1-70 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : ROMANIA Project ID No: 7ROMPA104 - Project : Power/Coal Rehabilitation Appraisal Date : JAN. 15, 1993 Total Project Cost: $600.00 Board Date : Dec. 07, 1993 Managing Division : EClIE Sector: Other Lending Instrument: Specific Investment Loan Status: Standby Date for receipt of-EA by Bank: To be determined Date EA Category Assigned: Apr. 15, 1992 MAJOR PROJECT COMPONENTS: Rehabilitation of thermal plants; modernization of load dispatching system; transmission system reinforcement; rehabilitation and restructuring of coal and lignite mines; environmental protection; and technical assistance. MAJOR ENVIRONMENTAL ISSUES: Increased emissions of oxides of sulphur and nitrogen from rehabilitated coal and lignite power plants; possible adverse impact on water of increased lignite products from open pit mines. OTHER ENVIRONMENTAL ISSUES: Ash disposal PROPOSED ACTIONS: Environmental impact assessment study including recommendations on remedial actions. JU9TIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Increased environmental impact. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Terms of reference - 6/19/92; consultants' selection - Aug./Sept. 1992; first draft report - Dec. 1992. REMARKS: None. 1-71 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : BANGLADESH Project ID No: 8BANPA132 Project : Road Rehabilitation and Maintenance II Appraisal Date : Nov. 15, 1992 Total Project Cost: $126.00 Board Date : Apr. 27,.1993 Managing Division : SA1EI Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Lending Date for receipt of EA by Bank: Nov. 1992 Date EA Category Assigned: June 4, 1992 MAJOR PROJECT COMPONENTS: Rehabilitation or reconstruction of about 200 km of roads in the northwest; construction of about 50 km of road on a new alignment in the' northwest; periodic maintenance works on about 400 km of other major roads in the northwest and southwest; continued implementation of the action plan for improved road maintenance; and implementation of an action plan to strengthen the construction industry. MAJOR ENVIRONMENTAL ISSUES: Improperly planned and designed road construction and upgrading could interfere with drainage and contribute to flooding problem. Alignment of new road component has not been decided but could involve wetlands and resettlement. OTHER ENVIRONMENTAL ISSUES: None. PROPOSED ACTIONS: New road component is presently under preinvestment planning. Study includes environmental assessment preparation. Design criteria will address environmental issues and impacts on local communities. There will be no environmental assessment for the rehabilitation program which will be carried out under agreed and monitorable environmental criteria. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: New road alignment is not decided but may have potential environmental impacts. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Environmental assessment for new road component is being prepared as part of preinvestment study. REMARKS: Transport sector work has examined general environmental issues in the sector, and projects are planned and designed to incorporate positive 1-72 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS environmental feastures. Affected groups will be consulted during the preinvestment study phase for the new road component; resettlement plan will be prepared if there is a need for resettlement. 1-73 ENVIRONMENTAL DATA SHEET.FOR CATEGORY "A" PROJECTS Country : BANGLADESH Project ID No: 8BANPA176 Project : Jamuna Multi Purpose Bridge Appraisal Date : Mar. 06, 1993 Total Project Cost: $528.00 Board Date : Nov. 02, 1993. Managing Division : SA1EI Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Completed Date EA Category Assigned: MAJOR PROJECT COMPONENTS: This project aims to stimulate economic growth by providing land transport of electricity, passenger and freight traffic and, potentially, natural gas and telecommunications between the northwest quadrant and the eastern half of the country. Components include a four lane bridge, bridge approaches, river training works technical assistance and training. MAJOR ENVIRONMENTAL ISSUES: Potential pollution and erosion during construction; interference with drainage; increased river bank erosion; disruption of agricultural practices including loss of agricultural land requiring involuntary resettlement; possible impact on fisheries, wildlife, navigation, and reduced dry-season crop yield through closure of northern Dhaleswari River; risk of explosion or fire from gas pipeline; seismic risks; risk of accident during road transport of hazardous materials; bridge and adjunct highways may induce uncontrolled development. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: An EA has been prepared as part of the feasibility study. Construction would be planned and managed to minimize impacts during construction., Plans now being formulated for -resettlement and for mitigating impacts on drainage, fisheries and agriculture, and for controlling land use would be implemented. An environment cell would be established in the implementing agency, expert consultants provided and its staff trained. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Supplementary resettlement, fisheries and wildlife studies and plans are under preparation. Studies on mitigation of effects in the upper Dhaleswari and the master plan are in progress. Mitigating measures will be incorporated into final planning and design for implementation. The initial EA is available now. The other studies, would be available prior to appraisal. 1-74 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS REMARKS: The affected people have been initially consulted as part of the studies for Dhaleswari River closure mitigation and the involuntary resettlement process, and this will be continued as part of the project preparation process. 1-75 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDIA Project ID No: 8INDPA421 Project : Maharashtra Power II Appraisal Date : Feb. 15, 1992- Total Project Cost: $1,200.00 Board Date : Jun. 23, 1992 Managing Division : SA2EG Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Completed Date EA Category Assigned: Oct. 8, 1991 MAJOR PROJECT COMPONENTS: (a) construction of last stage of Chandrapur thermal power station by the addition of a 500-MW coal fired unit; (b) extension of Maharashtra's transmission system, including the construction of a +/- 500 kV HVDC line from Chandrapur to Padghe (about 735 km) and the related terminal stations; (c) implementation of,a load management and loss reduction program and supply of associated equipment; (d) implementation of a program to strengthen the Board's environmental management capability at the corporate level; (e) study to formulate a restructuring program for MSEB to enhance its operational and managerial efficiency; and (f) implementation of a plan for increasing private sector participation in the development and ownership of new power generation and distribution projects in Maharashtra. MAJOR ENVIRONMENTAL ISSUES: Chandrapur 7: (a) emission of SO 2 and NO x; (b) TSP emissions from existing boilers; (c) liquid effluents from existing and new units; (d) no water flow in the Erai river downstream of the water supply dam; (e) water recycling and management; (f) contamination of the Erai river by the ash pond effluents; (g) coal dust emissions; (h) plant safety; (i) although not a consequence of the proposed project, the resettlement and rehabilitation (R&R) of the families displaced by the construction of units 5 and 6 (under the Chandrapur Thermal Power Project - Ln. 2544-IN) has not yet been completed. HVDC line: about 5 ha of forest area needs to be cleared for the construction of the line. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: Chandrapur 7: (a) construction of a 275-m high stack at Chandrapur 7 and utilization.of low-sulfur coal are considered sufficient to maintain air quality and SO 2 and NO x emissions within acceptable standards. Environmental clearance for the proposed project has however been given by GOI on the condition that a flue gas desulfurization (FGD) unit be constructed. Final decision on the FGD unit is still pending and will be a condition of negotiation; (b) a waste water treatment plant to dispose of liquid effluents from the existing and new units will be included in the design of the proposed plant; (c) measures related to water management, ash disposal, dust suppression, safety, and performance of the electrostatic precipitators, along with a detailed implementation schedule, will be agreed 1-76 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS with MSEB during appraisal; (d) an institutional development program to strengthen MSEB's environmental management capability will be agreed during appraisal; (e) a program for completing the R&R plan has been prepared with the help of a Bank-financed consultant and will be reviewed in detail during appraisal. HVDC line: forest clearance from GOI's Department of Environment will need to be obtained before project negotiation. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The environmental assessment report for the project is available. An Executive Summary has been prepared. jointly by SA2EG, ASTEG and ASTEN and is being revised in the context of the latest decisions made by GOI on the environmental clearance for Chandrapur 7 and by the Government of Maharashtra on the remaining resettlement issue. The summary is expected to be available for distribution to the Executive Directors by mid-February. REMARKS: Local NGOs are being involved in the implementation of the resettlement plan for Chandrapur. The construction of the waste water treatment plant as Well as the implemenation of various measures related to water management, ash disposal, dust suppression, safety performance of the electrostatic precipitators will be the object of dated covenants. 1-77 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDIA Project ID No: 81NDPA422 Project : 'NTPC Power Generation project Appraisal Date : May 26, 1992 Total Project Cost: $400.00. Board Date : Jan. 05, 1993 Managing Division : SA2EG Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Date EA Category Assigned: April 15, 1992 MAJOR PROJECT COMPONENTS: The proposed project would comprise: (i) a four to five year time-slice of NTPC's least cost investment program and may include up to 11 different coal and'gas-based power stations including the Farakka Power Station Extension (500 MW) and support for NTPC to undertake one or more joint sector operations; and (ii) technical assistance for NTPC's institutional development. MAJOR ENVIRONMENTAL ISSUES: Proposed power stations to be included in the project are coal fired stations and major issues are expected to be related to adherence to emission standards etc. Since the major components comprise extension of existing stations no major resettlement problems are expected. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: (i) ASTEN staff to participate in pre-appraisal scheduled for March 1992; and (ii) NTPC to prepare Environmental Impact Summaries for major components prior to appraisal. ,JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: All power generating stations to be constructed by NTPC fall in the A Category. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The Farakka Power Station extension was environmentally cleared by the Bank in 1990, as part of the Regional Power Systems Project of NTPC. NTPC is in a process of updating the environmental assessment report and has been requested to submit an EAS in accordance with new Bank guidelines. The. pre-appraisal mission would review NTPC's capabilities to,satisfactorily implement mitigating measures resulting from the environmental impact of the project as well as the environmental impact studies of other project components with NTPC. REMARKS: NTPC has been briefed on the latest Bank requirements on consultation of 1-78 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS affected people. The adequacy of the measures will be assessed during pre-appraisal. Bank financing would only be used for components with satisfactory environmentally clearances. Note: Until a formal decision is taken to split the Electric Power System Project, the same code is used for this project and the NPTC Power System Project. iI 1-79 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDIA Project ID No: 8INDPA441 Project : Bombay Sewage Disposal Appraisal Date : JAN. 15, 1993 Total Project Cost: $200.00 Board Date : May 25, 1993 Managing Division : SA2IN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Aug. 1992 Date EA Category Assigned: Sep. 30, 1991 MAJOR PROJECT COMPONENTS: Completion of facilities for the safe disposal of sewage from the Greater Bombay urban area, comprising two three-kilometer long, three-and-a- half meter diameter marine outfalls to dispose of sewage from two of Bombay's seven drainage zones; two aerated lagoons to treat sewage from two more drainage zones. MAJOR ENVIRONMENTAL ISSUES: (i) Only the first stage of a system for the disposal of Bombay's sewage will be developed under this project; this will provide for discharge of sewage at relatively shallow ocean depths and at three kilometers from the shore line after preliminary treatment for the removal of grit and screenings; this combination of treatment and outfall length will represent a tremendous improvement over present conditions under which raw sewage is discharged at the shore line. However it will not conform to established international practice, and conventional water quality standards, particularly with respect to bacteriological levels, will not be met under this first stage of construction. (ii) The quality of effluent from the aerated lagoons, to be constructed under this first stage of development, will be equivalent to that provided by conventional primary treatment of sewage; again, the improvement over present conditions will be dramatic but the discharge of this effluent to a tidal creek will not conform to established international practice and conventional water quality standards. OTHER ENVIRONMENTAL ISSUES: Facilities to remove grit and screenings from sewage from all of the seven drainage zones serving the Greater Bombay urban area have been constructed or are under construction. Measures for the safe disposal of these wastes are unsatisfactory at present and create an adverse environmental impact. PROPOSED ACTIONS: (i) Oceans outfalls - By monitoring the performance of the first stage works the extent and nature of future works needed to meet the appropriate water quality standards will be identified. Provision will be made in the ,first stage to increase the length of the outfalls and/or construct additional treatment facilities in the future. (ii) Aerated Lagoons - The basis of lagoon design is modular, and provision, including the reservation of adequate land areas, is to be made under this first stage of development for extension of the lagoons to meet the desired water quality standards in the 1-80 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS future. Measures for the safe disposal of wastes comprising grit and screenings will be identified as part of the environmental assessment and will be implemented under covenanted action in the proposed project. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: This project is designed to assist Municipal Corporation of Greater Bombay to reduce a serious, adverse environmental impact resulting from the present practice of indiscriminately discharging untreated sewage and sewage effluent to water courses and to the shoreline. Because of the magnitude of the facilities required to effect such improvements, only an initial stage will be implemented under the project. Although this will vastly improve the present situation it will not initially meet with internationally accepted environmental standards. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: In September 1991, the Municipal Corporation of Greater Bombay engaged consultants to prepare an environmental management plan for optimum improvement of environmental quality achieved by the construction of the two outfalls and lagoons. An initial assessment of the existing receiving water quality has been prepared. A summary environmental assessment for the lagoon and the outfalls (in terms of receiving water quality for various lengths of outfall discharging untreated or primary treated and chlorinated effluent) will be completed in August 1992. Full reports for the lagoons and the outfalls will be completed by September and December 1992, respectively. REMARKS: The Municipal Corporation of Greater Bombay is obtaining GOI's permission of the government of India to release the EA. 1-81 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDIA Project ID No: 8INDPA449 Project : Renewable Energy Development Appraisal Date : Jul. 15, 1992 Total Project Cost: $435.00 Board Date : Jan. 12, 1993 Managing Division : SA2EG Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Dec. 1991 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: The project will involve installation of: (a) irrigation-based mini-hydros; (b) non-conventional energy systems, i.e., wind farm and solar photovoltaics; (c) expansion of bagasse-based papermill. MAJOR ENVIRONMENTAL ISSUES: (a) There is a need to address noise, odors, safety and fire fighting problems in the existing and expanded papermill; (b) no significant negative environmental issues have been identified for the renewable energy systems to be installed. The proposed systems are small-scale and non-polluting leading to reduced dependence on fossil fuel for energy and enhanced opportunities for development of rural areas. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: (a) Based on plant site visit and results of EIAS, the following mitigatory actions were agreed with TNPL: in-plant design measures to minimize discharges of odorous compounds; installation of electrostatic precipitators on the power boiler; installation of external treatment systems to reduce suspended solids, BOD and COD to acceptable levels; conduct of a safety audit of chemical storage and handling; (b) IREDA, the financial, intermediary for renewable energy sub-projects, would require that as condition for obtaining financing, developers ensure that the project would meet acceptable environmental and social impact standards, environmental clearances are secured and that appropriate consultation with affected groups are made. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The papermill expansion project can have potentially adverse environmental impacts arising from the chemical pulp production process. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: An EIA study for papermill was conducted by NEERI; government clearance for circulation of the executive summary has been received. A safety audit report on chemical storage and handling has been conducted by TNPL's consultants and submitted for Bank's review. 1-82 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS REMARKS: No major environmental problems envisaged for mini-hydro schemes. Work will be done on existing canals and dams and flows will continue to be dictated by irrigation requirements. Comparative water demands will be made to ensure adequate water is available for both irrigation and power, and clearance from irrigation departments will be secured. Construction plans are based on minimizing risk of damage to the irrigation system, existing land use and local environment. Similar assessment will be required by IREDA for wind farms. 1-83 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : PAKISTAN Project ID No: 8PAKPA235 Project : Punjab Urban Environment Appraisal Date : Nov. 15, 1992 Total Project Cost: $226.00 Board Date : Apr. 27, 1993 Managing Division : SA3EI Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: To be determined Date EA Category Assigned: Nov. 6, 1991 MAJOR PROJECT COMPONENTS: (a) Industrial and hazarddtd wastewater treatment and disposal; (b) toxic waste cleanup together with construction and management of a treatment and disposal facility; (c) technical strengthening and training for EPA and related sector personnel; (d) a financial facility for private sector assistance to promote/ facilitate environmental cleanup investments; and (e) publicity campaigns to inform and raise public awareness of environmental issues. MAJOR ENVIRONMENTAL ISSUES: Location of incinerator for hospital waste and landfill for municipal waste. Location of facility to management hazardous waste. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: Execution of complete EAs. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: As several of the planned components will be rated to the level A, the whole project is classified with this rating. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Not yet decided. Most likely the EAs will start in June 1992. REMARKS: None. 1-84 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : PAKISTAN Project ID No: 8PAKPA249 Project : Domestic Energy Resources Development Appraisal Date : Mar. 01, 1991 Total Project Cost: $551.80 Board Date : Jun. 30, 1992 Managing Division : SA3EI Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Aug. 1991 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: (a) Developm7ent of oil and gas fields under joint.ventures with Dhodak-Kot Addu and Qadirpur-Spur Gas Pipelines installation of compressors and a supervisor control data acquisition system; (b) implementation of measures to mitigate the environmental impact of (a) above; (b) corporate restructuring of the Oil and Gas Development Corporation; (c) institution of organization reforms within the Ministry of Petroleum and Natural Resources (MNPR); and (d) technical assistance for (b) and (c) above. MAJOR ENVIRONMENTAL ISSUES: As is common with other hydrocarbon exploration, production and delivery projects, the environmental issues involve: land use during and after the drilling operations, pipeline routing, impact on flora and fauna. Given that one of the fields is around the Indus River, environmental issue of water use and marine life will also arise. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: Land Use: Implement mud management plan, proper disposal of solid waste, 100-meter buffer zone and fencing; Pipeline Routing: Aerial and ground survey to avoid villages and habitation, follow international standards for pipeline construction; Impact on Flora and Fauna: 100 meter buffer zone and coordinate wildlife protection with local NGOs; Water Use and Marine Life: Construct 9-ft pads for drill sites, construct well heads above flood crests, gas gathering facilities to be buried below plow depth, no dams on Indus River, maintain 100 meter buffer zone off the river and all active channels. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: An environmental assessment was conducted and environmental assessmen summary was prepared by OGDC and SNGPL and presented to the Executive Directors on August 28, 1991. REMARKS: None. 1-85 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : EGYPT Project ID No: MEGTPA187 Project : Tourism Infrastructure and Environment Appraisal Date : Jun. 15, 1992 Total Project Cost: $180.00 Board Date : Dec. 08, 1992 Managing Division : MN2IN Sector: Tourism Lending Instrument: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: July 15, 1992 Date EA Category Assigned: Dec. 19, 1991 MAJOR PROJECT COMPONENTS: Provision of infrastructure (water supply, sewerage, solid waste, road improvement), berthing facilities on the Nile, improvement of resource management and protection of biodiversity on the Red Sea Coast. MAJOR ENVIRONMENTAL ISSUES: Those normally associated with solid and liquid waste disposal in touristic areas; especially sensitive areas are along the Red Sea and the Nile River. OTHER ENVIRONMENTAL ISSUES: None. PROPOSED ACTIONS: Environmental assessments are being carried out for all touristic zones being developed under the project. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Strengthening environmental management in tourism development zones is a specific project objective and the project is designed to avoid significant environmental stress related to town development. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: EA first draft for a part of the project reviewned and sent back for further work. Next draft expected around July 15, 1992 REMARKS: None. 1-86 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : TUNISIA Project ID No: MTUNPA149 Project : Northern Tunisia Water Resource Mobilization Appraisal Date : Aug. 31, 1992 Total Project Cost: $300.00 Board Date : Mar. 30, 1993 Managing Division : HN1IN Sector: Water Supply and Sewerage Lending Instru ent: Specific Investment Loan Status: Lending Date for receipt of EA by Bank: Sep. 1992 Date EA Category Assigned: Nov. 12, 1991 MAJOR PROJECT COMPONENTS: A. Sidi El Barrak dam on the Oued Zouara two kms inland from the coastline. B. Additional works to protect rural population against flooding, realignment of roads and railway. C. Rehabilitation, replacement and installation of new measuring equipment. D. Extension (Tunis) and new construction (Nefza) of waste water treatment plants. E. Training, technical assistance, studies, sector-wide MIS and acquisition of computer equipment and sofware for integrated water management. MAJOR ENVIRONMENTAL ISSUES: Entire or partial property loss and physical isolation of some 740 families following the submersion of housing, land, roads and railroads due to the dam and reservoir construction. Reservoir pollution risks, from wastewater discharge from Nefza. Loss of flora and fauna in the area to be submerged by the reservoir. An indirect beneficial effect of the Sidi El Barrak dam project would be the availability of additional fresh water to preserve the National Park of Ischkeul, which is currently endangered by the construction of several dams in its basin. OTHER ENVIRONMENTAL ISSUES: Disturbance and disruption of services during construction. PROPOSED ACTIONS: Detailed resettlement plan to be developed before appraisal. Wastewater treatment plant for Nefza. Environmental mitigation and monitoring plan to be prepared before.appraisal. Implementation arrangements and schedule to be agreed at negotiations and constitute part of project conditionality. Creation of three protected areas in the reservoir watershed. Relocation of railway and roads and construction of additional roads. Proper planning and staging of project works. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Dam Construction Project is always Category "A." There were no changes from initial classification. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: 1-87 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS First EA draft was prepared in June 1991 accompanied by socioeconomic survey of affected population and social impact assessment submitted to the Bank in January 1992. The preappraisal mission of May 1992 submitted comments, discussed the reports, and provided instructions and guidelines for completion of EA, resettlement plan and consultation process before appraisal. Completion is expected by September 1992. REMARKS: To be developed before appraisal. I' 1-88 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : ANGOLA Project ID No: 3ANGPA001 Project : Fisheries Resources Management Appraisal Date : JAN. 15, 1993 Total Project Cost: $75.00 Board Date : Sep. 14, 1993 Managing Division : AF3AG Sector: Agriculture .& Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Country : ANGOLA Project ID No: 3ANGPAO24 Project : Transport Recovery Project Appraisal Date : Feb. 15, 1992 Total Project Cost: $104.00 Board Date : Jun. 23, 1992 Managing.Division : AF3IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Country : BENIN Project ID No: 3BENPAO38 Project : Food Security Appraisal Date : Dec. 15, 1992 Total Project Cost: $13.00 Board Date : Jul. 13, 1993 Managing Division : AFlAG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : BURUNDI Project ID No: 3BUIPA048 Project : Natural Resource Management Appraisal Date : Mar. 15, 1993 Total Project Cost: $100.00 Board Date : Jan. 25, 1994 Managing Division : AF3AG Sector: Agriculture & Rural Devt Lending Instrument: Sector Adjustment Loan Status: Lending Date EA Category Assigned: Nov. 4, 1991 Country : BURUNDI Project ID No: 3BUIPAO63 Project : Social Action Appraisal Date : Jul. 01, 1.992 Total Project.Cost: $22.10 Board Date : Mar. 16, 1993 Managing Division : AF3PH Sector: Population Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: June 04, 1992 .1-89 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS. Country : BURKINA FASO Project ID No: 3BURPAO50 Project : Private Sector Development Appraisal Date : Jun. 15, 1992 Total Project Cost: $35.00 Board Date : Dec. 15, 1992 Managing Division : AF5IE Sector: Public Sector Management Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: June 23, 1992 Country : CAMEROON Project ID No: 3CAMPA082 Project : Transport Sector Project Appraisal Date : JAN. 20, 1993 Total Project Cost: $200.00 Board Date : Jun. 15, 1993 Managing Division : AFlIN Sector: Public Sector Management Lending Instrument: Sector Investment and Maintenance Status:.Standby Date EA Category Assigned: Nov. 27, 1991 Country : CAMEROON Project ID No: 3CAMPA087 Project : Urban Management Improvement Appraisal Date : Feb. 26, 1993 Total Project Cost: $40.00 Board Date : Dec. 07, 1993 Managing Division : AF1IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: July 31, 1991 Country : CAMEROON Project ID No: 3CAMPA088 Project : Export Promotion & Diversification Appraisal Date : Oct. 16, 1992 Total Project Cost: $25.00 Board Date - : May 25, 1993. Managing Division : AFlAG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : CAPE VERDE Project ID No: 3CAPPA015 Project : Transport Infrastructure Appraisal Date : Jun. 25, 1992 Total Project Cost: $35.00 Board Date : Dec. 01,1992 Managing Division : AF5IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Nov. 27, 1991 IIg I-90 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : CHAD Project ID No: 3CHDPA049 Project : Transport Sector II Appraisal Date : Mar. 15, 1993 Total Project Cost: $200.00 Board Date : Jun. 15, 1994 Managing Division : AF5IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : COMOROS Project ID No: 3COMPA015 Project : Population & Human Resources Appraisal Date : Mar. 01, 1993 Total Project Cost: $14.00 Board Date : Jul. 13, 1993 Managing Division : AF3PH Sector: Population Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Country : DJIBOUTI Project ID No: 3DJIPA013 Project : Transport Rehabilitation Appraisal Date : Jun. 10, 1993 Total Project Cost: $17.00 Board Date : Feb. 15, 1994 Managing Division : AF3IN Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Standby Date EA Categoiy Assigned: Country : EQ. GUINEA Project ID No: 3EQGPA013 Project : Technical Assistance II/Energy Appraisal Date : Mar. 18, 1992 Total Project Cost: $2.00 Board Date : Jun. 30, 1992 Managing Division : AFlIE Sector: Technical Assistance Lending Instrument: Technical Assistance Loan Status: Standby Date EA Category Assigned: Feb. 26, 1992 Country : ETHIOPIA Project ID No: 3ETHPAO68 Project : Peasant Coffee Development Appraisal Date : Jun. 09, 1989 Total Project Cost: $80.00 Board Date : Jun. 29, 1993 Managing Division : AF2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 1-91 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : ETHIOPIA Project ID No: 3ETHPAO78 Project : Road Rehabilitation Appraisal Date : Sep. 10, 1990 -Total Project Cost: $110.00 Board Date : Aug. 18, 1992 Managing Division : AF2IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Feb. 10, 1992 Country : ETHIOPIA Project ID No: 3ETHPAO96 Project : National Seeds Appraisal Date : Feb. 20, 1992 Total Project Cost: $55.00 Board Date : Oct. 06, 1992 Managing Division : AF2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : ETHIOPIA Project ID No: 3ETHPAO97 Project : Fertilizer Sector Appraisal Date : Dec. 01, 1992 Total Project Cost: $60.00 Board Date : Jul. 06, 1993 Managing Division : AF2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : GHANA Project ID No: 3GHAPA087 Project : Telecommunications III Appraisal Date : Jul. 05, 1993 Total Project Cost: $200.00 Board Date : Feb. 22, 1994 Managing Division : AF4IE Sector: Communications Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: June 24, 1992 Country : GHANA Project ID No: 3GHAPAO92 Project : Rural Water/Works Appraisal Date : Jul. 09, 1993 Total Project Cost: $42.00 Board Date : Apr. 12, 1994 Managing Division : AF4IN Sector: Water Supply and Sewerage Lending Instrument: Sector Investment and Maintenance Status: Lending 'Date EA Category Assigned: Oct. 1991 1-92 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : GHANA Project ID No: 3GHAPAO98 Project : Livestock Services Appraisal Date : May 01, 1992 Total Project Cost: $41.00 Board Date : Dec. 08, 1992 Managing Division : AF4AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: June 23, 1992 Country : GHANA Project ID No: 3GHAPA101 Project : Tertiary Education Appraisal Date : Mar. 16, 1992 I Total Project Cost: $50.00 Board Date : Dec. 15, 1992 Managing Division : AF4PH Sector: Education Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: June 23, 1992 Country : GHANA Project ID No: 3GHAPA104 Project : Urban III Appraisal Date : Jun. 28, 1993 Total Project Cost: $48.00 Board Date : Feb. 15, 1994 Managing Division : AF4IN Sector: Urbanization Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Oct. 1992 Country : GHANA Project ID No: 3GHAPA110 Project : Environmental Resource Management Appraisal Date : Feb. 29, 1992 Total Project Cost: $37.20 Board Date : Sep. 29, 1992 Managing Division : AF4AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Nov. 1991 Country : GHANA Project ID No: 3GHAPA121 Project : National Electrification Appraisal Date : Jun. 28, 1992 Total Project Cost: $75.00 Board Date : Dec. 22, 1992 Managing Division : AF4IE Sector: Power Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: 1-93 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS 1 Country : GHANA Project ID No: 3GHAPA124 Project : Urban Transport Appraisal Date : Nov. 15, 1992 Total Project Cost: $240.00 Board Date : May 25, 1993 Managing Division : AF4IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Oct. 21, 1991 Country : GHANA Project ID No: 3GHAPA125 Project : Highway Sector Appraisal Date : Aug. 09, 1993 Total Project Cost: $250.00 Board Date : Mar.. 01, 1994 Managing Division : AF4IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Aug. 1991 Country : GUINEA BIS. Project ID No: 3GUBPAO35 Project : Natural Resources Management Appraisal Date : Apr. 15, 1993 Total Project Cost: $20.00 Board Date : Feb. 15, 1994 Managing Division : AF4AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: May 1992 Country : GUINEA Project ID No: 3GUIPA038 Project : Telecommunications Appraisal'Date : May 11, 1992 Total Project Cost: $15.00 Board Date : Oct. 13, 1992 Managing Division : AFlIE Sector: Communications Lending Instrument: Sector Investment and Maintenance Status: Standby Date EA Category Assigned: Mar. 7, 1991 Country ,: GUINEA Project ID No: 3GUIPA052 Project : Transportation and Urban Infrastructure Appraisal Date : May 29, 1992 Total Project Cost: $30.00 Board Date : Dec. 22, 1992 Managing -Division : AFlIN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Aug. 15, 1990 I-94 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : COTE DIVOIRE Project ID No: 3IVCPAO91 Project : Private Sector Energy Appraisal Date : Sep. 03, 1992 Total Project Cost: $250.00 Board Date : Jun. 01, 1993 Managing Division : AFlIE Sector: Power Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Nov. 26, 1991 Country : COTE DIVOIRE Project ID No: 3IVCPA102 Project : Rural Equipment Project Appraisal Date : Feb. 01, 1993 Total Project Cost: $60.00 Board Date : Jun. 28, 1994 Managing Division : AF1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status:. Standby Date EA Category Assigned: Country : COTE DIVOIRE Project ID No: 3IVCPA115 Project : Road Maintenance & Rehabilitation . Appraisal Date : Jun. 10, 1992 Total Project Cost: $180.00 Board Date : Dec. 22, 1992 Managing Division : AFlIN Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Country : KENYA Project ID No: 3KENPA102 Project : Urban Transport Appraisal Date : Sep. 01, 1992 Total Project Cost: $200.00 Board Date : Jul. 27, 1993 Managing Division : AF2IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : LESOTHO Project ID No: 3LESPAO30 Project : Infrastructure Maintenance Appraisal Date : Feb. 01, 1993 Total Project Cost: $30.00 Board Date : Jan. 18, 1994 Managing Division : AF6IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Nov. 1, 1991 1-95 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : LESOTHO. Project ID No: 3LESPA035 Project : Infrastructure Engineering Appraisal Date : Nov. 20, 1991 Total Project Cost: $12'.30 Board Date : Jun. 30, 1992 Managing Division : AF6IN Sector: Transportation Lending Instrument: Technical Assistance Loan Status: Lending Date EA Category Assigned: Nov. 1, 1991 Country : MADAGASCAR Project ID No: 3MAGPA068 Project : Transport Sector Development Appraisal Date : Jul. 15, 1992 Total Project Cost: $80.00 Board Date : Nov. 10, 1992 Managing Division :.AF3IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Country : MADAGASCAR Project ID No: 3MAGPAO92 Project : Petroleum Sector Adjustment Appraisal Date : Jun. 15, 1991 Total Project Cost: $70.00 Board Date : Sep. 22, 1992 Managing Division : AF3IE Sector: Energy Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Nov. 26, 1991 Country : MADAGASCAR Project ID No: 3MAGPA096 Project : Urban II Appraisal Date : Jul. 15, 1993 Total Project Cost: $90.00 Board Date : Apr. 12, 1994 Managing Division : AF3IN Sector: Urbanization Lending,Instrument: Sector Investment and Maintenance Status: Standby Date EA Category Assigned: Country : MADAGASCAR Project ID No: 3MAGPA108 Project : Export Crop Promotion Appraisal Date : Oct. 01, 1992 Total Project Cost: $30.00 Board Date : Sep. 07, 1993 Managing Division : AF3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 1-96 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : MALAWI Project ID No: 3MALPAO74 Project : Agricultural Services Appraisal Date : Jun. 20, 1992 Total Project Cost: $60.00 Board Date : Feb. 09, 1993 Managing Division : AF6AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : MALAWI Project ID No: 3MALPA081 Project : National Water Development Appraisal Date : Jul. 01, 1993 Total Project Cost: $25.00 Board Date : Mar. 02, 1994 Managing Division : AF6IN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Apr. 1990 Country : MALI Project ID No: 3MLIPA048 Project : Infrastructure/Transport Sector Appraisal Date : Feb. 15, 1993 Total Project Cost: $80.00 Board Date : Jul. 13, 1993 Managing Division : AF5IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Nov. 27, 1991 Country : MALI Project ID No: 3MLIPAO65 Project : Private Sector Development Appraisal Date : Feb. '17, 1992 Total Project Cost: $35.00 Board Date : Jul. 15, 1992 Managing Division : AF5IE Sector: Industry Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : MOZAMBIQUE Project ID No: 3MOZPAO37 Project : Rural Restructuring Appraisal Date : May 29, 1992 Total Project Cost: $22.00 Board Date : Apr. 01, 1993 Managing Division : AF6AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 1-97 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : MAURITANIA Project ID No: 3MTAPAO55 Project : Water Supply Appraisal Date : Feb. 15, 1992 Total Project Cost: $70.00 Board Date : Jun. 17, 1992 Managing Division :- AF5IN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Oct. 10, 1991 Country : NIGER Project ID No: 3NIGPA061 Project : Private Irrigation Appraisal Date : Jun. 19, 1991 Total Project Cost: $13.50 Board Date : Sep. 29, 1992 Managing Division : AF5AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : NIGERIA Project ID No: 3NIRPAO78 Project : Power VIII Appraisal Date : Sep. 06, 1991 Total Project Cost: $429.00 Board Date : Mar. 30, 1993 Managing Division : AF4IE Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : NIGERIA Project ID No: 3NIRPA105 Project : Multi-State Roads I Appraisal Date' : Nov. 16, 1991 Total Project Cost: $135.00 Board Date : Jun. 18, 1992 Managing Division : AF4IN Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Sept. 1990 Country : NIGERIA Project ID No: 3NIRPA142 Project : Railways Appraisal Date : Sep. 21, 1992 Total Project Cost: $250.00 Board Date : Jul. 20, 1993 Managing Division : AF4IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Nov. 26, 1991 1-98 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : NIGERIA Project ID No: 3NIRPA163 Project : Lagos Urban Transport Appraisal Date : Jun. 29, 1992 Total Project Cost: $100.00 Board Date : May 11, 1993 Managing Division : AF4IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Country : RWANDA Project ID No: 3RWAPA052 Project : Energy Sector Rehabilitation Appraisal Date : Apr. 24, 1992 Total Project Cost: $55.00 Board Date : Jan. 12, 1993 Managing Division : AF3IE Sector: Power Lending,.Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Nov. 26, 1991 Country : RWANDA Project ID No: 3RWAPA058 Project : Water Supply III Appraisal Date : Sep. 15, 1993 Total Project Cost: $39.00 Board Date : May 17, 1994 Managing Division : AF3IN - Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Country : RWANDA Project ID No: 3RWAPAO72 Project : Food Security & Social Action. Appraisal Date : Nov. 29, 1991 Total Project Cost: $40.00 Board Date : Jun. 17, 1992 Managing Division : AF3PH Sector: Population Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : RWANDA Project ID No: 3RWAPAO73 Project : Private Sector (APEX) Appraisal Date : Jul. 15, 1992 Total Project Cost: $27.50 Board Date : Feb. 09, 1993 Managing Division : AF3IE Sector: Industrial Devel/Finance Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: 1-99 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : SENEGAL Project ID No: 3SENPAO76 Project : Water Supply III Appraisal Date : Mar. 28, 1991 Total Project Cost: $298.00 Board Date : Feb. 23, 1993 Managing Division : AF5IN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : SENEGAL Project ID No: 3SENPAO78 Project : Energy II Appraisal Date .: Jun. 19, 1992 Total Project Cost: $120.00 Board Date : Jan. 14, 1993 Managing Division : AF5IE Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : SENEGAL Project ID No: 3SENPAO94 - Project : Private Sector Appraisal Date : Sep. 30, 1992 Total Project Cost: $30.00 Board Date : Jul. 01, 1993 Managing Division : AF5IE Sector: Industry Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : SEYCHELLES Project ID No: 3SEYPA006 Project : Environment & Transport Appraisal Date : May 27, 1992 Total Project Cost: $64.00 Board Date : Sep. 08, 1992 Managing Division,: AF31N Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Nov. 26, 1991 Country : SIERRA LEONE Project ID No: 3SILPAO21 Project : Roads Rehabilitation & Maintenance Appraisal Date : Apr. 20, 1992 Total Project Cost: $96.50 Board Date : Oct. 06, 1992 Managing Division : AF4IN Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Oct. 21, 1991 I-100 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country . SWAZILAND Project ID No: 3SWAPAO22 Project : Urban Development I Appraisal Date : Dec. 01, 1992 Total Project Cost: $50.00 Board Date : Sep. 14, 1993 Managing Division : AF6IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : TANZANIA, Project ID No: 3TANPAO86 Project : Urban/Infrastructure Rehabilitation Appraisal Date : Jul. 01, 1993 Total Project Cost:.$60.00 Board Date : Jun. 04, 1994 Managing Division : AF6IN Sector: Urbanization Lending Instrument: Sector Adjustment Loan Status: Standby Date KA Category Assigned: June 17, 1992 Country : TANZANIA Project ID No: 3TANPA108 Project : Telecom III Appraisal Date : May 30, 1992 Total Project Cost: $120.00 Board Date : Mar. 09, 1993 Managing Division : AF6IE Sector: Communications Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : TANZANIA Project ID No: 3TANPA115 Project : Private Sector Development Appraisal Date : JAN. 10, 1994 Total Project Cost: $50.00 Board Date : Jun. 15, 1994 Managing Division : AF6IE Sector: Industrial Devel/Finance Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : TOGO Project ID No: 3TOGPA022 Project : Agricultural Services Rehabilitation Appraisal Date : Feb. 26, 1990 Total Project Cost: $21.10 Board Date : Feb. 16, 1993 Managing Division : AF1AG Sector: Agriculture & Rural Devt Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: I-101 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : TOGO Project ID No: 3TOGPAO39 Project : Lome Urban Development Appraisal Date : Jun. 15, 1992 Total Project Cost: $35.00 Board Date : Mar. 02, 1993 Managing Division : AF1IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: May 15, 1990 Country : UGANDA Project ID No: 3UANPAO30 Project : Transport Sector Rehabilitation Appraisal Date : Aug. 29, 1992 Total Project Cost: $67.00 Board Date : Jul. 13, 1993 Managing Division : AF2IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : UGANDA Project ID(No: 3UANPA045 Project : Agricultural Research and Training Appraisal Date : Jun. 19, 1992 Total Project Cost: $45.00 Board Date : Jan. 19, 1993 Managing Division : AF2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Apr. 20, 1992 Country : UGANDA Project ID No: 3UANPA064 Project : Small Towns Water Appraisal Date : Sep. 14, 1992 Total Project Cost: $55.80 Board Date. : Jun. 22, 1993 Managing Division : AF2IN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: 06/23/92 Country : UGANDA Project ID No: 3UANPAO98 Project : Pilot Extension Project Appraisal Date : May 01, 1992 Total Project Cost: $15.00 Board Date : Sep. 08, 1992 Managing Division : AF2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 1-102 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : ZAIRE Project ID No: 3ZAIPA104 Project : Urban Environment Appraisal Date : Apr. 19, 1989 Total Project Cost: $16.50 Board Date : Jun. 01, 1993 Managing Division : AF3IN Sector: Urbanization Lending Instrument: Sector Investment and Maintenance Status: Standby Date EA Category Assigned: Country : ZAMBIA Project ID No: 3ZAMPA060 Project : Power Rehabilitation Appraisal Date : Sep. 21, 1992 Total Project Cost: $40.00 Board Date : May 13, 1993 Managing Division : AF6IE Sector: Energy Lending Instrument: Sector Investment and Maintenance Status: Standby Date EA Category Assigned: Feb. 14, 1991 Country : ZAMBIA Project ID No: 3ZAMPAO70 Project : Export Diversification Appraisal Date : Nov. 09, 1992 Total Project Cost: $65.00 Board Date : Apr. 06, 1993 Managing Division : AF6AG Sector: Agriculture & Rural Devt Lending Instrument: Sector Investment and Maintenance Status: Standby Date EA Category Assigned: Country : ZAMBIA Project ID No: 3ZAMPAO73 Project : Marketing & Process Appraisal Date : JAN. 19, 1992 Total Project Cost: $68.00 Board Date : Jun. 23, 1992 Managing Division : AF6AG Sector: Agriculture & Rural Devt Lending Instrument: Sector Investment and Maintenance Status: Standby Date EA Category Assigned: Country : ZIMBABWE Project ID No: 3ZIMPA046 Project : Urban Transportation Appraisal Date : JAN. 14, 1991 Total Project Cost: $240.00 Board Date : Jun. 29, 1993 Managing Division : AF6IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 1-103 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : ZIMBABWE Project ID No: 3ZIMPA047 Project : Power Distribution Appraisal Date : Jul. 15, 1990 Total Project Cost: $48.50 Board Date : Jul. 14, 1992 Managing Division : AF6IE. Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : ZIMBABWE Project ID No: 3ZIMPA057 Project : Agricultural Services Appraisal Date : May 30, 1992 Total Project Cost: $100.00 Board Date : May 25, 1993 Managing Division : AF6AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Mar. 24, 1992 Country : ZIMBABWE Project ID No: 3ZIMPAO68 Project : Emergency Drought Recovery Appraisal Date : Mar. 23, 1992 Total Project Cost: $100.00 Board Date : Jun. 23, 1992 Managing Division : AF6CO Sector: Agriculture & Rural Devt Lending Instrument: Emergency Reconstruction Loan Status: Standby Date EA Category Assigned: Mar. 10, 1992 1-104 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : CHINA Project ID No: 4CHAPAO64 Project : Zhejiang Multi-Cities Development Appraisal Date, : Feb. 14, 1992 Total Project Cost: $253.20 Board Date : Oct. 20, 1992 Managing Division : EA2EH Sector: Urbanization Lending Instrument: Specific Investment Loan, Status: Lending Date EA Category Assigned: I. Country : CHINA Project ID No: 4CHAPA102 Project : Changchun Water Supply & Environmental Appraisal Date : May 17, 1992 Total Project Cost: $205.00 Board Date : Nov. 24, 1992 Managing Division : EA2EH Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Apr. 17, 1992 Country : CHINA Project ID No: 4CHAPA126 Project : Shanghai Industrial Enterprise Reform Appraisal Date : Jun. 30, 1993 Total Project Cost: $350.00 Board Date : Feb. 01, 1994 Managing Division : EA2IE Sector: Industrial Devel/Finance Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Mar. 19, 1992 Country : CHINA Project ID No: 4CHAPA127 Project : Tianjin Industrial Development Appraisal Date : Jun. 15, 1992 Total Project Cost: $100.00 Board Date : Mar. 16, 1993 Managing Division : EA2IE Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Standby Date EA Category Assigned: Country : CHINA Project ID No: 4CHAPA155 Project : Sichuan Agriculture Development Appraisal Date : Nov. 08, 1991 Total Project Cost: $287.60 Board Date : Jul. 07, 1992 Managing Division : EA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: May 23, 1991 1-105 -ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : CHINA Project ID No: 4CHAPA162 Project : Tianjin Urban Development & Environment Appraisal Date : Apr. 28, 1991 Total Project Cost: $200.00 Board Date : Jun. 17, 1992 Managing Division : EA2EH Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : CHINA Project ID No: 4CHAPA164 Project : Sixth Railway Project Appraisal Date : Jun. 30, 1992 Total Project Cost: $1,100.00 Board Date : Apr. 13, 1993 Managing Division : EA2TP Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : CHINA Project ID No: 4CHAPA167 Project : Jiangsu Chemical ;Sector Appraisal Date : Feb. 05, 1990 Total Project Cost: $333.70 Board Date : Sep. 15, 1992 Managing Division : EA2IE Sector: Industrial Devel/Finance Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : CHINA- Project ID No: 4CHAPA174 Project : Southern Jiangsu Environmental Protection Appraisal Date : Jun. 22, 1992 Total Project Cost: $301.40 Board Date : Feb. 02, 1993 Managing Division : EA2IE Sector: Industry Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: June 1992 Country : CHINA Project ID No: 4CHAPA178 Project : Electronics Appraisal Date : Jul. 01, 1993 Total Project Cost: $330.00 Board Date : Mar. 08, 1994 Managing Division : EA2IE Sector: Industry Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: 1-106 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : CHINA Project ID No: 4CHAPA179 Project : Shenyang Engineering Industry Appraisal Date : May 15, 1993 Total Project Cost: $100.00 Board Date : Feb. 15, 1994 Managing Division : EA2IE Sector: Industry Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Country : CHINA Project ID No: 4CHAPA180 Project : Shanghai Environment Appraisal Date :1May 10, 1993 Total Project Cost: $600.00 Board Date : Apr. 05, 1994 Managing Division : EA2EH Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : CHINA Project ID No: 4CHAPA189 Project : Red Soils II Land Rehabilitation Appraisal Date : Apr. 04, 1993 Total Project Cost: $300.00 Board Date : Nov. 23, 1993 Managing Division :-EA2AG Sector: Agriculture & Rural Devt, Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : CHINA Project ID No: 4CHAPA192 Project : Liaoning Environment Appraisal Date : Nov. 25, 1992 Total Project Cost: $300.00 Board Date : Sep. 14, 1993 Managing Division : EA2EH Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Country : CHINA Project ID No: 4CHAPA197 Project : Housing and Social Security Reform Appraisal Date : Oct. 01, 1992 Total Project Cost: $400.00 Board Date : Jul. 06, 1993 Managing Division : EA2EH Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Feb. 6, 1992 1-107 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : CHINA Project ID No: 4CHAPA221 Project : Grain Distribution Appraisal Date : Oct. 10, 1992 Total Project Cost: $1,000.00 Board Date : May 18, 1993 Managing Division : EA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : CHINA Project ID No: 4CHAPA224 Project : Ships' Waste Disposal Facilities Appraisal Date : Apr. 15, 1991 Total Project Cost: $64.10 Board Date : Jun. 17, 1992 Managing Division : EA2TP Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : FIJI Project ID No: 4FIJPAO20 Project : Roads Appraisal Date : Feb. 09, 1992 Total Project Cost: $71.00 Board Date : Jun. 18, 1992 Managing Division : EA3IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : INDONESIA Project ID No: 41NSPA220 Project : Forestry III Appraisal Date : Sep. 20, 1993 Total Project Cost: $120.00 Board Date : May 10, 1994 Managing Division : EA3AG - Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Mar. 27, 1992 Country : INDONESIA Project ID No: 4INSPA250 Project : Third Kabupaten Roads Development Appraisal Date : JAN. 24, 1992 Total Project Cost: $439.00 Board Date : Jun. 17, 1992 Managing Division : EA3IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 12/06/91 1-108 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : INDONESIA Project ID No: 41NSPA252 Project : Kalimantan Urban Development Appraisal Date : Oct. 01, 1993 Total Project Cost: $100.00 Board Date : Jun. 28, 1994 Managing Division : EA3IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Country : INDONESIA Project ID No: 41NSPA271 Project : Financial Sector Development Appraisal Date : JAN. 28, 1991 Total Project Cost: $4,250.00 Board Date : Jun. 25, 1992 Managing Division : EA3IE Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Feb. 6, 1992 Country : INDONESIA Project ID No: 41NSPA280 Project : Second Rural Electrification Project Appraisal Date : Mar. 15, 1993 Total Project Cost: $600.00 Board Date : Sep. 21, 1993 Managing Division : EA3IE Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : INDONESIA Project ID No: 41NSPA285 Project : Land Management Project Appraisal Date : Aug. 08, 1993 Total Project Cost: $50.00 Board Date : May 31, 1994 Managing Division : EA3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Apr. 8, 1992. Country : INDONESIA Project ID No: 41NSPA286 Project : Watershed Management and Conservation Appraisal Date : Oct. 16, 1992 Total Project Cost: $100.00 Board Date : Apr. 20, 1993 Managing Division : EA3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Oct. 29, 1990 1-109 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : INDONESIA Project ID No: 4INSPA291 Project : Water and Sanitation for Low Income Communities Appraisal Date : Nov. 16, 1992 Total Project Cost: $100.00 Board Date : May 25, 1993 Managing Division : EA3PH Sector: Population Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Mar. 31, 1992 Country : INDONESIA Project ID No: 4INSPA300 Project : Ground Water Development (Appraisal Date : Sep. 01, 1992 Total Project Cost: $90.00 Board Date : Feb. 16, 1993 Managing Division : EA3AG Sector: Agriculture & Rural-Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Feb. 25, 1991 Country : INDONESIA Project ID No: 4INSPA307 Project : E. Indonesia Kabupaten Roads Appraisal Date : Oct. 01, 1992 Total Project Cost: $200.00 Board Date : Mar. 16, 1993 Managing Division : EA3IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : INDONESIA Project ID No: 41NSPA308 Project : Cirata Hydro Phase II. Appraisal Date : Jun. 15, 1992 Total Project Cost: $200.00 Board Date : Feb. 16, 1993 - Managing Division : EA3IE . Sector: Power Lending Instrument: Specific Investment Loan, Status: Lending Date EA Category Assigned: Country : INDONESIA Project ID No: 4INSPA310 Project : Integrated Pest Management. Appraisal Date : Nov. 09, 1992 Total Project Cost: $60.00 Board Date : Jun. 22, 1993 Managing Division : EA3AG Sector: Agriculture & Rural Devt. Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: March 1992 I-110 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : KOREA Project ID No: 4KORPA121 Project : Railroad System Modernization - Appraisal Date : Sep. 04, 1991 Total Project Cost: $411.00 Board Date : Aug. .11, 1992 Managing Division : EAlIN Sector:. Transportation . Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : LAO, P.D.R. Project ID No: 4LAOPA018 Project : Industrial Credit II Appraisal Date : Nov. 01, 1992 Total Project Cost: $15.00. Board Date : Jul. 13, 1993 Managing Division : EAllE Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Standby Date EA Category Assigned: Country : LAO, P.D.R. Project ID No: 4LAOPAO20 Project : Forest Management and Conservation Appraisal Date : Nov. 19, 1991 Total Project Cost: $24.90 Board Date : Oct. 06, 1992 Managing Division : EA1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 10/31/91 Country : LAO, P.D.R. Project ID No: 4LAOPAO21 Project : Provincial Grid Integration Appraisal Date : Nov. 05, 1991 Total Project Cost: $41.00 Board Date : Aug. 04, 1992 Managing Division : EAllE Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : LAO, P.D.R. Project ID No: 4LAOPA029 Project : Telephone System Expansion Appraisal Date : Nov. 01, 1992 Total Project Cost: $40.00 Board Date : Jul. 06, 1993 Managing Division :EAllE Sector: Communications Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: I-111 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : PHILIPPINES Project ID No: 4PHLPA151 Project : Land Reform Support Appraisal Date : Oct. 20, 1992 Total Project Cost: $25.00 Board Date : Jun. 08, 1993 Managing Division : EALAG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: 11/8/91 Country : PHILIPPINES Project ID No: 4PHLPA153 Project : Second Water Supply, Sewerage and Sanitation Sector Appraisal Date : JAN. 10, 1993 Total Project Cost: $50.00 Board Date : Jun. 22, 1993 Managing Division : EAlIN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : PHILIPPINES Project ID No: 4PHLPA172 Project : Telephone System Expansion Appraisal Date : Nov. 20, 1990 Total Project Cost: $235.00 Board Date : Aug. 04, 1992 Managing Division : EAlIE Sector: Communications Lending,Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Country : PHILIPPINES Project ID No: 4PHLPA184 Project : Irrigation Operations Support II Appraisal Date : Aug. 15, 1992 Total Project Cost: $100.00 Board Date : Mar. 02, 1993 Managing Division : EA1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : PHILIPPINES Project ID No: 4PHLPA188 Project : Rural Infrastructure Appraisal Date : Oct. 15, 1992 Total Project Cost: $145.00 Board Date : Jun. 08, 1993 Managing Division : EAlIN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: 1-112 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : SOLOMON IS. Project ID No: 4SLIPA015 Project : Housing Appraisal Date : Nov. 15, 1992 Total Project Cost: $7.00 Board Date : Sep. 07, 1993 Managing Division : EA3IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : THAILAND Project ID No: 4THLPA147 Project : Distribution System Improvement & Expansion Appraisal Date : Mar. 19, 1992 Total Project Cost: $436.00 Board Date : Oct. 06, 1992 Managing Division : EAlIE Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Nov. 27, 1991 Country : VANUATU Project ID No: 4VANPA013 Project : Petroleum Exploration T.A. Appraisal Date : Oct. 15, 1992 Total Project Cost: $4.00 Board Date : Mar. 16, 1993 Managing Division : EA3IE Sector: Energy Lending Instrument: Technical Assistance Loan Status: Lending Date EA Category Assigned: June 10, 1991 1-113 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : ALGERIA. Project ID No: 5ALGPAO36 Project : Highways VI Appraisal Date : Sep. 04, 1993 Total Project Cost: $270.00 Board Date : Mar. 01, 1994 Managing Division : MN1IN Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Oct. 22, 1991 Country- : ALGERIA Project ID No: 5ALGPA084 Project : Construction Industry Appraisal Date : Sep. 04, 1992 Total Project Cost: $250.00 Board Date : Dec. 07, 1992 Managing Division : MN1IN Sector: Industry Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Nov. 12, 1992 Country : ALGERIA Project ID No: 5ALGPAO95' Project : Agricultural Sector Adjustment Loan Appraisal Date : Jul. 15, 1993 Total Project Cost: $175.00 Board Date : Apr. 19, 1994 Managing Division : MNIAG Sector: Agriculture & Rural Devt Lending Instrument: Sector Adjustment Loan Status: Standby Date EA Category Assigned: Country : ALGERIA Project ID No: 5ALGPAO97 Project : Irrigation Management Support Appraisal Date : Sep. 15, 1993 Total Project Cost: $50.00 Board Date : Jan. 08, 1994 Managing Division : MNIAG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : EGYPT Project-ID No: 5EGTPA147 Project : Industrial Pollution/Energy Conservation Appraisal Date : Jun. 22, 1992 Total Project Cost: $168.60 Board Date : Jan. 12, 1993 Managing Division : MN2IE Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 1-114 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : EGYPT Project ID No: 5EGTPA172 Project : Resource Management Project Appraisal Date : Oct. 15, 1992 Total Project Cost: $35.00 Board Date : Jul. 01, 1993 Managing Division : MN2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Dec. 19, 1991 Country : EGYPT Project ID No: 5EGTPA176 Project : Agricultural Modernization Appraisal Date : Jun. 25, 1992 Total Project Cost: $164.30 Board Date : Feb. 16, 1993 Managing Division : MN2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : IRAN Project ID No: 5IRNPA038 Project : Irrigation Improvement.Project Appraisal Date : Sep. 15, 1992 Total Project Cost: $175.00 Board Date : Mar. 16, 1993 Managing Division : MN2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 3/16/92 Country : JORDAN Project ID No: 5JORPA046 Project : Transport III Appraisal Date : Mar. 06,- 1992 Total Project Cost: $78.60 Board Date : Dec. 01, 1992 Managing Division : MN2IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending -Date EA Category Assigned: Country : MOROCCO Project ID No: 5MYCPA081 Project : Municipal Finance II Appraisal Date : Nov. 15, 1992 Total Project Cost: $300.00 Board Date : Sep. 21, 1993 Managing Division : MN1IN Sector: Urbanization Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: 11/12/91 1-115 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : MOROCCO Project ID No: 5MYCPAO87 Project : Water Supply V Appraisal Date : JAN. 20, 1993 Total Project Cost: $250.00 Board Date : Sep. 07, 1993 Managing Division : MN1IN Sector: Water Supply and Sewerage Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Mar. 13, 1992 Country : MOROCCO Project ID No: 5MYCPA114 Project : Second LSII Appraisal Date : Feb. 10, 1992 Total Project Cost: $300.00 Board Date : Nov. 17, 1992 Managing Division : MN1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Aug. 30, 1991 Country : MOROCCO Project ID No: 5MYCPA139 Project : National Rural Finance Appraisal Date : Apr. 05, 1993 Total Project Cost: $850.00 Board Date : Jan. 23, 1994 Managing Division : MN1AG Sector: Agriculture & Rural Devt Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Country : MOROCCO Project ID No: 5MYCPA152 Project : Irrigated Areas Agricultural Services Appraisal Date : Mar. 25, 1993 Total Project Cost: $40.00 Board Date : Jul. 27, 1993 Managing Division : MN1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: June 20, 1991 Country : TUNISIA Project ID No: 5TUNPA096 Project : Municipal Sector Investment Appraisal Date : Oct. 20, 1991 Total Project Cost: $247.00 Board Date : Jun. 30, 1992 Managing Division : MNIIN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Nov. 12, 1991 1-116 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : TUNISIA Project ID No: 5TUNPA120 Project : Industrial Finance Appraisal Date : Sep. 14, 1992 Total Project Cost: $250.00 Board Date : Mar. 02, 1993 Managing Division : MNIE Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Country : TUNISIA Project ID No: 5TUNPA130 Project : National Rural Finance Appraisal Date : JAN. 11, 1993 Total Project Cost: $170.00 Board Date : Jul. 20, 1993 Managing Division : MN1AG Sector: Agriculture & Rural Devt Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Country : TUNISIA Project ID No: 5TUNPA134 Project : Transport Sector Development Appraisal Date : Jul. 31, 1993 Total Project Cost: $150.00 Board Date : Feb. 08, 1994 Managing Division : MN1IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Nov. 13, 1991 Country : TUNISIA - Project ID No: 5TUNPA135 Project : Second Forestry Development Appraisal Date : Sep. 01, 1992 Total Project Cost: $150.00 Board Date : May 18, 1993 Managing Division : MN1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Oct. 31, 1991 Country : TUNISIA Project ID No: 5TUNPA143 Project : NW Rural Development II Appraisal Date : Jul. 15, 1993 Total Project Cost: $50.00 Board Date : Apr. 12, 1994 Managing Division : MN1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 1-117 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : YEMEN Project ID No: 5YEMPA214 Project : Livestock Development Appraisal Date : Sep. 15, 1993 Total Project Cost: $30.00 Board Date : Apr. 26, 1994 Managing Division : MN2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Mar. 20, 1992 1-118 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : ARGENTINA Project ID No: 6ARGPAO68 Project : Capital Markets Development Loan Appraisal Date : Aug. 15, 1992 Total Project Cost: $950.00 Board Date : Aug. 15, 1993 Managing Division : LA4TF Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Dec. 18, 1991 Country : ARGENTINA Project ID No: 6ARGPA083 Project : Road Maintenance Appraisal Date : Jul. 06, 1992 Total Project Cost: $560.00 Board Date : Nov. 17, 1993 Managing Division : LA4IE Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Nov. 13, 1991 Country : BARBADOS Project ID No: 6BARPA016 Project : Road Maintenance & Rehabilitation II Appraisal Date : Feb. 10, 1992 Total Project Cost: $32.30 Board Date : Jun. 23, 1992 Managing Division : LA3IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Nov. 12, 1991 Country : BELIZE Project ID No: 6BEZPA012 Project : Belize City Infrastructure Appraisal Date : Mar. 15, 1993 Total Project Cost: $7.50 Board Date : Jan. 15, 1994 Managing Division : LA3IN Sector: Tourism Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Mar. 13, 1992 Country : BELIZE Project ID No: 6BEZPA013 Project : Private Sector Development Appraisal Date : Sep. 08, 1992 Total Project Cost: $8.00 Board Date : Jun. 15, 1993 Managing Division : LA3TF Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Standby Date EA Category Assigned: Dec. 6, 1991 1-119 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : BOLIVIA Project ID No: 6BOLPA064 Project : Private Enterprise Reform and Private Sector Devt Appraisal Date : Jun. 15, 1993 Total Project Cost: $44.50 Board Date : Mar. 15, 1994 Managing Division : LA3TF Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Nov. 18, 1991 Country : BOLIVIA Project ID No: 6BOLPAO71 Project : Road Maintenance II Appraisal Date : Jun. 26, 1991 Total Project Cost: $240.00 Board Date : Jun. 18, 1992 Managing Division : LA3IN Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Nov. 1991 Country : BRAZIL Project ID No: 6BRAPA165 Project : State Highways Management Appraisal Date : Apr. 30, 1990 Total Project Cost: $500.00 Board Date : Jul. 14, 1992 Managing Division : LAllN Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: April 1, 1988 Country : BRAZIL Project ID No: 6BRAPA292 Project : Mato Grosso Natural-Resources Management Appraisal Date : Oct. 10, 1991 Total Project Cost: $275.00 Board Date : Jun. 18, 1992 Managing Division : LA1EA Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Nov. 11, 1991 Country : BRAZIL Project ID No: 6BRAPA299 Project : Environment II (CVRD) Appraisal Date : Mar. 17, 1992 Total Project Cost: $220.00 Board Date : Jun. 30, 1993 Managing Division : LA1EI Sector: Other Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Nov. 7, 1991 1-120 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : BRAZIL Project ID No: 6BRAPA311 Project : Minas Municipal Development Appraisal Date : Feb. 15, 1993 Total Project Cost: $250.00 Board Date : Oct. 15, 1993 Managing Division : LAllN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Mar. 20, 1992 Country : CHILE Project ID No: 6CHLPAO63 Project : Health Sector Reform Appraisal Date : Jun. 22, 1992 Total Project Cost: $397.00 Board Date : Mar. 16, 1993 Managing Division : LA4HR Sector: Population Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Jul 26, 1990 Country : CHILE Project ID No: 6CHLPA085 Project : Infrastructure II Appraisal Date : Mar. 08, 1993 Total Project Cost: $1,400.00 Board Date : Jul. 15, 1993 Managing Division : LA4IE Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Mar. 10, 1992 Country : COLOMBIA Project ID No: 6CLMPA191 Project : Export Development. Appraisal Date : Jun. 15, 1992 Total Project Cost: $200.00 Board Date :.Oct. 13, 1992 Managing Division : LA3TF Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Nov. 20, 1990 Country : COLOMBIA Project ID No: 6CLMPA196 Project : Agriculture Sector Credit Appraisal Date : Apr. 20, 1992 Total Project Cost: $500.00 Board Date : Jan. 07, 1993 Managing Division : LA3AG Sector: Agriculture & Rural Devt Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Dec. 12, 1989 1-121 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : COSTA RICA Project ID No: 6COSPA047 Project : Second Water Supply and Sewerage Project Appraisal Date : Jun. 15, 1992 Total Project Cost: $40.00 Board Date : Dec. 01, 1992 Managing Division : LA2IE Sector: Water Supply and.Sewerage Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Nov 20, 1991 Country : ECUADOR Project ID No: 6ECUPA068 Project : Private Sector Development Appraisal Date : Dec. 12, 1990 Total Project Cost: $252.00 Board Date : Nov. 24, 1992 Managing Division : LA4TF Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Aug. 07, 1990 Country : EL SALVADOR Project ID No: 6ESLPAO31 Project : Agriculture Sector Investment Appraisal Date : Sep. 30, 1991 Total Project Cost: $11.00 Board Date : Oct. 27, 1992 Managing Division : LA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Nov. 14, 1990 Country : GUATEMALA Project ID No: 6GUAPA042 Project : Social Investment Fund Appraisal Date : JAN. 28, 1990 Total Project Cost: $95.30 Board Date : Aug. 11, 1992 Managing Division : LA2HR Sector: Population Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Jan. 13, 1989 Country : GUYANA Project ID No: 6GUYPAO34 Project : Infrastructure Rehabilitation Appraisal Date : Jun. 15, 1992 Total Project Cost: $35.00 Board Date : Dec. 29, 1992 Managing Division : LA3IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Nov. 20, 1991 1-122 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : GUYANA Project ID No: 6GUYPA036 Project : Sugar Industry Rehabilitation Appraisal Date : Mar. 16, 1992 Total Project Cost: $226.00 Board Date : Feb. 18, 1993 Managing Division : LA3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Feb. 15, 1991 Country : HONDURAS Project ID No: 6HDSPA047 Project : Agriculture Sector Loan Appraisal Date : May 04, 1992 Total Project Cost: $99.90 Board Date : Sep. 08, 1992 Managing Division : LA2AG Sector: Agriculture & Rural Devt Lending Instrument: Sector Adjustment Loan Status: Lending Date EA Category Assigned: Aug. 06, 1990 Country : HONDURAS Project ID No: 6HDSPAO57 Project : Transport Sector Rehabilitation Appraisal Date : Jun. 15, 1992 Total Project Cost: $41.10 Board Date : Jun. 15, 1993 Managing Division : LA2IE Sector: Transportation Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Oct. 18, 1991 Country : HONDURAS Project ID No: 6HDSPAO61 Project : Nutrition/Health Appraisal Date : Jun. 15, 1992 Total Project Cost: $46.00 Board Date : Jan. 15, 1993 Managing Division : LA2HR Sector: Population Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Jun. 15, 1992 Country : HONDURAS Project ID No: 6HDSPAO63 Project : Second Social Investment Fund Appraisal Date : Feb. 20, 1992 Total Project Cost: $62.00 Board Date : Jun. 25, 1992 Managing Division : LA2HR Sector: Population Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Mar. 15, 1992 1-123 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : MEXICO Project ID No: 6MXCPA149 Project : Railway Sector Appraisal Date : Sep. 15, 1992 Total Project Cost: $400.00 Board Date : May 15, 1993 Managing Division : LA2IE Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Standby Date EA Category Assigned: Nov. 20, 1991 Country : MEXICO Project ID No: 6MXCPA152 Project : Urban Transport II Appraisal Date : JAN. 27, 1992 Total Project Cost: $400.00 Board Date : Jul. 28, 1992 Managing Division : LA2IE Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Nov. 12, 1991 Country : MEXICO Project ID No: 6MXCPA168 Project : Power Sector Loan Appraisal Date : Aug. 15, 1992 Total Project Cost: $3,000.00 Board Date : Jan. 15, 1993 Managing Division : LA2IE Sector: Power Lending Instrument: Sector Investment and Maintenance Status: Standby Date EA Category Assigned: Oct. 15, 1991 Country : MEXICO Project ID No: 6MXCPA182 Project : Rural Financial Sector Appraisal Date : Feb. 16, 1992 Total Project Cost: $800.00 Board Date : Jul. 14, 1992 Managing Division : LA2AG Sector: Agriculture & Rural Devt Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: Sep. 22, 1989 Country : MEXICO Project ID No: 6MXCPA201 Project : Housing Market Development Appraisal Date : JAN. 28, 1992 Total Project Cost: $400.00 Board Date : Jun. 30, 1992 Managing Division : LA2IE Sector: Urbanization Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Mar. 15, 1991 1-124 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : MEXICO Project ID No: 6MXCPA206 Project : On-Farm And Small Scale Irrigation Improvement Appraisal Date : Apr. 15, 1993 Total Project Cost: $800.00 Board Date : Sep. 15, 1993 Managing Division : LA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Nov. 12, 1991 Country : NICARAGUA Project ID No: 6NICPAO53 Project : Social Investment Fund Appraisal Date : Jun. 15, 1992 Total Project Cost: $45.00 Board Date : Nov. 15, 1992 Managing Division : LA2HR Sector: Population Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Mar. 16, 1992 Country : PARAGUAY Project ID No: 6PARPA066 Project : Transport Appraisal Date: : Jun. 07, 1992 Total Project Cost:-$105.00 Board Date : Nov. 24, 1992 Managing Division : LA4IE Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Jan. 30, 1990 Country : PARAGUAY Project ID No: 6PARPAO70 Project : Private Sector Development Appraisal Date : JAN. 20, 1992 Total Project Cost: $90.40 Board Date : Nov. 15, 1992 Managing Division : LA4TF Sector: Industrial Devel/Finance Lending Instrument: Specific Investment Loan - Status: Lending Date EA Category Assigned: Feb. 14, 1990 Country : PARAGUAY Project ID No: 6PARPAO73 Project : Water Supply Appraisal Date : Feb. 17, 1992 Total Project Cost: $36.30 Board Date : Oct. 15, 1992 Managing Division : LA4IE Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: June 27, 1991 1-125 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : PERU Project ID No: 6PERPA117 Project : Infrastructure Rehabilitation Appraisal Date : Nov. 17, 1992 Total Project Cost: $275.00 Board Date : Jul. 15, 1993 Managing Division : LAlIN Sector: Urbanization Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Dec. 16, 1991 Country : PERU Project ID No: 6PERPA120 Project : Basic Health and Nutrition Appraisal Date : JAN. 15, 1993 Total Project Cost: $100.00 Board Date : Jun. 15, 1993 Managing Division : LA1HR Sector: Population Lending Instrument: Sector Investment and Maintenance Status: Standby Date EA Category Assigned: June 12, 1992 Country : PERU' Project ID No: 6PERPA124 Project : Municipal Development Appraisal Date : Jun. 15, 1993 Total Project Cost: $150.00 Board Date : Jun. 15, 1994 Managing Division : LAlIN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Country : TRINIDAD & T Project ID No: 6TRIPAO27 Project : Sewerage Rehabilitation and Expansion Appraisal Date : Sep. 15, 1993 Total Project Cost: $80.00 Board Date : Mar. 15, 1994 Managing Division : LA3IN Sector: Tourism Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Mar. 18, 1992 Country : VENEZUELA Project ID No: 6VENPAO31 Project : Urban Transport I Appraisal Date : Sep. 15, 1992 Total Project Cost: $300.00 Board Date : Jun. 15, 1993 Managing Division : LAlIN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Nov. 2, 1990 I-126 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : VENEZUELA Project ID No: 6VENPAO33 Project : Low-Income Barrios Improv.ement Appraisal Date : Dec. 09, 1991 Total Project Cost: $85.00 Board Date : Jun. 23, 1992 Managing Division : LAlIN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Sep. 21, 1989 Country : VENEZUELA Project ID No: 6VENPAO36 Project : Hospital Modernization Appraisal Date : Dec. 15, 1992 Total Project Cost: $200.00 Board Date : Jul. 15, 1993 Managing Division : LA1HR Sector: Population Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: April 3, 1992 Country : VENEZUELA Project ID No: 6VENPA044 Project : Highway Management Appraisal Date : Apr. 27, 1992 Total Project Cost: $500.00 Board Date : Oct. 15, 1992 Managing Division : LAlIN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Nov. 15, 1991 Country : VENEZUELA Project ID No: 6VENPA045 Project : Water Sector Reform Appraisal Date : Apr. 15, 1993 Total Project Cost: $200.00 Board Date : Jun. 15, 1994 Managing Division : LAlIN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Country : VENEZUELA Project ID No: 6VENPA048 Project : Endemic Disease Control Appraisal Date : May 16, 1992 Total Project Cost: $164.00 Board Date : Nov. 10, 1992 Managing Division : LAlHR Sector: Population Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Nov. 7, 1991 1-127 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : ALBANIA Project ID No: 7ALBPA007 Project : Transport/Infrastructure Appraisal Date : Feb. 15, 1993 Total Project Cost: $10.10 Board Date : Jul. 20, 1993 Managing Division : EC2IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : BULGARIA Project ID No: 7BULPA005 Project : Agricultural Development Appraisal Date : Sep. 28, 1992 Total Project Cost: $110.00 Board Date : Jul. 22, 1993 Managing Division : EC1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : BULGARIA Project ID No: 7BULPA008 Project : Industrial Restructuring Appraisal Date : Aug. 31, 1992 Total Project Cost: $100.00 Board Date : Jan. 26, 1993 Managing Division : ECIIE Sector: Public Sector Management Lending Instrument: Sector Adjustment Loan Status: Standby Date EA Category Assigned: June 29, 1992 Country : HUNGARY Project ID No: 7HUNPAO31 Project : Roads Appraisal Date : Apr. 20, 1992 Total Project Cost: $90.00 Board Date : Dec. 22, 1992 Managing Division : EC2IN Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Mar. 24, 1992 Country : HUNGARY Project ID No: 7HUNPA048 Project : Product Market Development Appraisal Date : JAN. 06, 1992 Total Project Cost: $230.00 Board Date : Sep. 11, 1992 Managing Division : EC2AW Sector: Agriculture & Rural Devt Lending Instrument: Financial Intermediary Loan Status: Lending Date EA Category Assigned: 1-128 ENVIRONHENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : POLAND Project ID No: 7POLPAO36 Project : Roads Appraisal Date : Jun. 22, 1992 Total Project Cost: $200.00 Board Date : Feb. 13, 1993 Managing Division : EC2IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Country : POLAND Project ID No: 7POLPA043 Project : Cogeneration Privatization Appraisal Date : May 15, 1992 Total Project Cost: $400.00 Board Date : Jan. 06, 1993 Managing Division : EC2EE Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : POLAND Project ID No: 7POLPA047 Project : Forestry Development Project Appraisal Date : Jun. 07, 1992 Total Project Cost: $260.00 Board Date : Jan. 22, 1993 Managing Division : EC2AW Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Country : ROMANIA Project ID No: 7ROMPAO81 Project : Transportation Appraisal Date : Dec. 04, 1992 Total Project Cost: $115.00 Board Date : May 27, 1993 Managing Division : ECllN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Country : ROMANIA Project ID No: 7ROMPAO83 Project : Financial System Modernization Appraisal Date : May 25, 1992 Total Project Cost: $250.00 Board Date : Mar. 01, 1993 Managing Division : EC1CO Sector: Program Lending/SAL Lending Instrument: Structural Adjustment Loan Status: Lending Date EA Category Assigned: 1-129 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : TURKEY Project ID No: 7TURPA152 Project : East Anatolia Watershed Rehabilitation Appraisal Date : Jun. 15, 1992 Total Project Cost: $160.00 Board Date : Feb. 16, 1993 Managing Division : EC1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : TURKEY Project ID No: 7TURPA184 Project : Southwest Coast Environment Appraisal Date : JAN. 30, 1993 Total Project Cost: $200.00 Board Date : Sep. 14, 1993 Managing Division : EClIN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Jan. 11, 1990 Country : TURKEY Project ID No: 7TURPA194 Project : Bursa Environment Appraisal Date : Jun. 15, 1992 Total Project Cost: $175.00 Board Date : Feb. 18, 1993 Managing Division : EC1IN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Aug. 21, 1990 Country : TURKEY Project ID No: 7TURPA206 Project : Coal Pollution Abatement Appraisal Date : Jun. 24, 1992 Total Project Cost: $220.00 Board Date : Mar. 25, 1993 Managing Division : EC1IE Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : TURKEY Project ID No: 7TURPA222 Project : Antalya Environment Appraisal Date : May 03, 1993 Total Project Cost: $170.00 Board Date : Dec. 09, 1993 Managing Division : EClIN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Sep. 1991 1-130 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : BANGLADESH Project ID No: 8BANPA137 Project : Forest Resources Management Appraisal Date : Nov. 11, 1991 Total Project Cost: $58.70 Board Date : Jun. 18, 1992 Managing Division : SA1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : BANGLADESH Project ID No: 8BANPA151 Project : Agricultural Research III Appraisal Date : Nov. 30, 1992 Total Project Cost: $50.00 Board Date : Jun. 15, 1993 Managing Division : SA1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Apr. 15, 1992 Country : BANGLADESH Project ID No: 8BANPA167 Project : Third Chittagong Water Supply Project Appraisal Date : JAN. 14, 1992 Total Project Cost: $25.00 Board Date : Dec. 08, 1992 Managing Division : SA1EI Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Country : BANGLADESH Project ID No: 8BANPA192 Project : Power Rehabilitation Appraisal Date : Dec. 01, 1989 Total Project Cost: $244.60 Board Date : Jan. 19, 1993 Managing Division : SAIEI Sector: Power Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Dec. 1989 Country : BANGLADESH Project ID No: 8BANPA200 Project : Gas Infrastructure Development Appraisal Date : Oct. 07, 1992 Total Project Cost: $150.00 Board Date : Mar. 16, 1993 Managing Division : SAIEI Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Mar. 1992 1-131 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : BANGLADESH Project ID No: 8BANPA204 Project : East/West Interconnector Appraisal Date : Mar. 06, 1993 Total Project Cost: $168.00 Board Date : Nov. 02, 1993 Managing Division : SA1EI Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : BANGLADESH Project ID No: 8BANPA212 Project : River Bank Protection Appraisal Date : Jun. 25, 1992 Total Project Costs $225.00 Board Date : Feb. 09, 1993 Managing Division :.SA1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: May 31, 1990 Country : BANGLADESH Project ID No: 8BANPA216 Project : Coastal Embankment Rehabilitation Appraisal Date : Jun. 26, 1992 Total Project Cost: $60.00 Board Date : Mar. 30, 1993 Managing Division : SA1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : BANGLADESH Project ID No: 8BANPA223 Project : Multi-Purpose Cyclone Shelter Project Appraisal Date : Sep. 15, 1993 Total Project Cost: $200.00 Board Date : Apr. 13, 1994 Managing Division : SA1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Sep. 05, 1991 Country : BANGLADESH Project ID No: 8BANPA224 Project : Bangladesh Fourth Telecommunications Project Appraisal Date : Jun. 15, 1993 Total Project Cost: $300.00 Board Date : Mar. 29, 1994 Managing Division : SA1EI Sector: Communications Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: 1-132 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : BHUTAN Project ID No: 8BHUPA014 Project : Forestry III Appraisal Date : May 03, 1992 Total Project Cost: $15.00 Board Date : Dec. 08, 1992 Managing Division : SAlAG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : INDIA Project ID No: 8INDPA368 Project : Railways Productivity Improvement Appraisal Date : Mar. 15, 1991 Total Project Cost: $1,425.00 Board Date : Jun. 18, 1992 Managing Division : SA2IN Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: Country : INDIA Project ID No: 81NDPA374 Project : Rubber Appraisal Date : Feb. 13, 1992 Total Project Cost: $145.00 Board Date : Aug. 04, 1992 Managing Division : SA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : INDIA Project ID No; 81NDPA398 Project : Port Modernization Appraisal Date : Jun. 15, 1993 Total Project Cost: $650.00 Board Date : Dec. 07, 1993 Managing Division : SA2IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : INDIA Project ID No: 81NDPA419 Project : ADP Rajasthana Appraisal Date : May 04, 1992 Total Project Cost: $110.00 Board Date : Oct. 06, 1992 Managing Division : SA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Apr. 27, 1992 1-133 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : INDIA Project ID No: 8INDPA431 Project : Bihar Plateau Development Appraisal Date : May 15, 1992 Total Project Cost: $170.00 Board Date : Dec. 01, 1992 Managing Division : SA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : INDIA Project ID No: 8INDPA435 Project : Karnataka Rural W.S. and Environmental Sanitation Appraisal Date : Oct. 01, 1992 Total Project Cost: $145.00 Board Date : Apr. 06, 1993 Managing Division : SA2IN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Nov. 1991 Country : INDIA Project ID No: 8INDPA452 Project : Andhra Pradesh Forestry Project Appraisal Date, : Feb. 15, 1993 Total Project Cost: $128.00 Board Date : Sep. 14, 1993 Managing Division : SA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: April 1992 Country : NEPAL Project ID No: 8NEPPAO65 Project : Forestry IV (Siwalike & Tarai) Appraisal Date : Aug. 10, 1993 Total Project Cost: $40.00 Board Date : Mar. 29, 1994 Managing Division : SA1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: Country : NEPAL Project ID No: 8NEPPAO68 Project : Irrigation Sector Project (ISP) Appraisal Date : Sep. 15, 1993 Total Project Cost: $47.00 Board Date : Mar. 31, 1994 Managing Division : SA1AG Sector: Agriculture & Rural Devt Lending Instrument: Sector Investment and Maintenance Status: Standby Date EA Category Assigned: Mar. 27, 1991 1-134 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : NEPAL Project ID No: 8NEPPAO93 Project : Road Maintenance Appraisal Date : May 01, 1993 Total Project Cost: $65.00 Board Date : Sep. 28, 1993 Managing Division : SA1EI Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : NEPAL Project ID No: 8NEPPAO95 Project : Rural Water Supply & Sanitation Appraisal Date : Sep. 15, 1993 Total Project Cost: $25.00 Board Date : Mar. 15, 1994 Managing Division : SA1EI Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: July 1990 Country : NEPAL Project ID No: 8NEPPAO96 Project : Sunsary Morang II Supplement Appraisal Date : Sep. 15, 1991 Total Project Cost: $30.00 Board Date : Aug. 25, 1992 Managing Division : SA1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : PAKISTAN Project ID No: 8PAKPA218 Project : Eastern Sadiqia (South) Phase I Appraisal Date : Jun. 25, 1991 Total Project Cost: $65.90 Board Date : Jun. 17, 1992 Managing Division : SA3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : PAKISTAN Project ID No: 8PAKPA228 Project : Private Sector Energy Development II Appraisal Date : Jun. 01, 1993 Total Project Cost: $2,000.00 Board Date : Feb. 08, 1994 Managing Division : SA3EI Sector: Power Lending Instrument: Sector Investment and Maintenance Status: Lending Date EA Category Assigned: 1-135 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : PAKISTAN Project ID No: 8PAKPA232 Project : Int. Hill Farming II Appraisal-Date : Jun. 15, 1992 Total Project Cost: $69.60 Board Date : Dec. 08, 1992 Managing Division : SA3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Country : PAKISTAN Project ID No: 8PAKPA233 Project : Power Sector Development Project (WAPDA X) Appraisal Date : May 29, 1992 Total Project Cost: $4,050.00 Board Date : Dec. 08, 1992 Managing Division : SA3EI Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Feb. 28, 1991 Country : PAKISTAN Project ID No: 8PAKPA256 Project : Ag Env./Forestry II Appraisal Date : Aug. 01, 1993 Total Project Cost: $100.00 Board Date : Mar. 01, 1994 Managing Division : SA3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date EA Category Assigned: June 03, 1992 Country : SRI LANKA Project ID No: 8SRIPAO80 Project : Transport I Appraisal Date : Sep. 01, 1992 Total Project Cost: $286.00 Board Date : May 04, 1993 Managing Division : SA3EI Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Sep. 25, 1991 Country : SRI LANKA Project ID No: 8SRIPA081 Project : Community Water Supply & Sanitation Appraisal Date : Feb. 03, 1992 Total Project Cost: $27.20 Board Date : Sep. 29, 1992 Managing Division : SA3EI Sector: Water Supply and Sewerage Lending Instrument: Specific Investment.Loan Status: Lending Date EA Category Assigned: 1-136 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : SRI LANKA Project ID No: 8SRIPA097 Project : Highway Maintenance Project Appraisal Date : Mar. 01, 1993 Total Project Cost: $150.00 Board Date : Mar. 15, 1994 Managing Division : SA3EI Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date EA Category Assigned: Nov. 1991 ANNEX II GLOBAL ENVIRONMENT FACILITY - QUARTERLY REPORT ON INVESTMENT PROJECTS The Global Environment Trust Fund (GET) under the framework of the Global Environment Facility (GEF) was established in the Bank on March 14, 1991 to assist developing countries by way of grants and concessional financing in carrying out programs to protect the global environment. The GEF is a three-year pilot program designed to demonstrate cost-effective, innovative technologies or approaches to mitigate selected global environmental problems. It has four objectives for the operations of the Facility: a) reducing and limiting emission of greenhouse gases which cause global warming; b) preserving the earth's biological diversity and maintaining natural habitats; c) arresting the pollution of international waters; and d) protecting the ozone layer from further depletion. However, projects to reduce emissions of ozone depleting substances will largely be funded from the Bank's Ozone Layer Protection Trust Fund which receives funds from the Interim Multilateral Fund under the Montreal Protocol. GEF is a cooperative venture among national governments, the World Bank (for investment projects), the United Nations Development Programme-UNDP (for pre-investment studies and technical assistance), and the United Nations Environment Programme-UNEP (for scientific and technical advice). Further, the Bank has been asked to administer the program funded by GET, and in its capacity as Trustee, the Bank is also authorized to enter into Cofinancing Arrangements with potential cofinanciers. This quarterly Annex C provides information on investment projects that have been reviewed by the GEF Participants (Donors) and have been approved for further processing by the Bank, as well as investment projects that are in the project pipeline to be presented for review at subsequent GEF Participants' meetings. ---」-今%-―・;ぐ GLOBAL ENVIRONMENT FAa[LrTY QUARTERLY REPORT ON INVESTMENT PROJECIS (AlOfJune]S.1992) ANNEX 11-1 Country/ Ammust(lim) GEF Proj GEF Implementing & Prebable (Free-standialir Objeethe Consulting lAteavir Leader Stage orproetosiog a and Associated Beak Prpled) Project Description Services Action an Procurement AMUCA CAMEROON 9.0 Tropical Forest Bioalvwwty To be determined project Pipeline Ministry of (GEE) (Ecological protection) Development of land use plus for Agriculture 10.0 Priority w-; execution Of fumal and floral (Bank) surveys; and development and Implementation Of Management Plans of reserves. CENTRALAFRIc& 1.s Acquisition and Distribau. or walversity To be determined (GEF) Coesprehenalve Landset TM Acquisition of I and-at 77A data sets for Work Program Satellite imagery monitoring Ind-use changes and Appraisal scheduled (Free standing project) evaluating effectiveness of environmental To be determined management and conservation efforts in die region. CONGO 1U cause Wua6m& Projectiou BIWITerdly consulting services Work Program Min. of Planning (GEE) and Management Preservation of several unique eco- will be required Apprallsa,11 completed in & Economy (Free standing project) systems through institutional 611ppDrt, Much , 1992. Negotiations inventories of reserves and management scheduled for August Plans technical assistance and studies. 1992. GHANA 7.2 coastal Ecosystems Blodiversity Foreign consulting Work Program Env.Protection (GEF) (Envim--t) Management of five coastal wetlands; services ml,i-i Appraisal oomplete L Council 20.0 fty"y and demarcation of site . boundaries Negotiations tentatively and development of management plan scheduled for August 1992 studies; identification of development options; establishment of Investment funds; training and education KENYA 6.2 Tons River Primates Bk*Uvwdty To be determined Work Program Min. of Wildlife (GEF) (Agric. SectorMimat Praj. 11) Establishing effective management Tourism 60.0 Of the Reserve and reducing 'Project Prep2raflon Advance of $S20,0D0 has (IDA) reliance by loon] community on been approved. resource; of the Reserv& MALAWI 4.0 Lake Malawi Conservation Biodiversity ODnnftg serv ion Work Program (GIN) of Blodiverally Artis" fisherman Unining and will be require& Appraisal scheduled (Malawi Fisheries Praj.) blodiversity management, public for Sep. 1992 SwIfelless. fiPwi&n state, institutional building MAURITIUS 3.3 Sugar Energy Biotechnology Global Warning Consulting Services Work Program Mauritius Sugar (GEF) (Sugar Energy Dev. Fraj.) Sugar-mill energy efficiency will be required. Bank autociated project Authority 15.0 improvements; trials and experiments approved on March 31,1992, (Bank) On harvesting, handling, storage, and GEF project approved combustion for cane field trawlt ad an Feb. 5, 1992. One tape; technical assistance and studies; reduction of greenhouse go emissions. NIGERIA 3U Gas Flaring Reduction Global Warming To be determined Project pipalIsse (GEF) (To be determined) Reduction of greenhouse gam through 20.0-30.0 60 flare reduction, energy efficiency (GEF CofbL souibt) and conservation. SEYCHELLES 1.3 Blodiversky Conservation Blediversity To be determined Work Program Ministry of (GEr) Abotemeat of Marine PakU= Protection of endangered on turttes; Appraisal scheduled Planing and 10.0 Mdmltm=m and Environment) 'saturation of ecosystem of Aldabra world for June 1992 Ext. Relations (Bauk) hatilLfige site; long term man- ement plane. Abatement Of Marine pollution. Design of twilitler and strengthening of capacity to treat waste from ships; technical ' assistance; application of am recovery methods. UGANDA Dwinal Forest Gorgilis Reserve Biwilrircraity To be determined Work Program (GEF) (Free standing project) Conservation of biological diversity Appraisal departure 30.0 and natural forest wwyst=, whedulad for Nov. 92. (Others) including strengthening Governments Pro-investment study of capacity to protect and manage SIS1,000basbeen protected areas. approved by UNDP. GLOBAL ENVIRONMENT FACLITY iUARTERLY REPORT ON INVESrMENTPROJECTs ANNEX Ii- (As of June 15,.1992) C-atry/ Ammat (m) GET Prej GEF Impkeeagh & Preabe (Prbo4.aading Objoeede & rokuMay SCage ofProcuagaad KAeney ader Aoci~ated Baak Projet) Proed DoeaServie A-J ~ ou Procuresielt ZA0 BldIvlky Prneei B ~dBreruity To be detered Projet Pipelae (GE) (Evronment) nprove manneament of protected a Project placed in 20.0 explore altenativ fort management rystem; REser Program duc BD (IDA) promote agroforeetry and natural reource delay resulting from mmagemet strengthen national capacty political situatIon. for policy aals, cov. a=esment ud earh; tralning. ZIMBAWE .0 Wmlfe Cms. am Eä,. MgBL zi~dversity Consulting erce Werk Program (GEF) (Wildflfe and Envronmental Cplre ~rogram, local ommunky will be requred Projeat under preparadon Managenent Projoet) widfe management, blological orridor PPA of SDR 300,000 ha cohabiatlcu of agrclture, Uvestoc äd been approved. Appraial wildlife scheduled for March 1993 EAST &SOUTHASIA . BEWUAN 10.0 Trut Fad for Ewr. C~aserva~io. BEldicnersty To be determLaed Wark Program (GE ) (re atmnding project) Managenent plannIg and Approved on May 21, in~tiional trengtLheng, ba3ning 1992. Grant agreement ad surveym signed. CHINA 30.0 Marie umedo. Inernadeoaa Water Poludom To be determined Werk P gram Minstry of (GEF) (Shipe Wm-e Dpoa1 Project) Pollution reductIon throug Bank project approved Communcationm, 15.0 mode ~ing faclltles at eix porte on June 17,1992. GET Six ports Author. (IDA) for bandlng oli and other wulff. project approved on May 22, 1992. CHINA 20.0 BlvdIreru~ty Adem Pha Idoverfdty To be determined Prject Pipe~me Min. of Porentry (GEF) (Priority Forest eervee) Biodiverhity conservaton action plan, Project under preparaton 5.0-10.0 invetnent identification and prepration (bilaMru cofin. research and tralning sought) CHINA 10.0 Siebhm Gan Dev. & C oervaoa G~ebal Warmiag To be determinad Work Program Sichuan Petroleum (GEF) (Sidman Gu Dev. and Ditribution ad transmision Appraal scbeduled Administration 10.0 Conservation) gm lo evalusdon and reducton for Dec. 1992 (GEP Cofin. cought) Pre-investment sludy of $1.4 million has been approved by UNDP. INDIA 10.0 Alseruatve Emergy Glb.! Warmig To be determined Work Program 1REDA (GET) (Renewable RsourOc Dev.Pboj.) Reduction in gobal warming, PV nd Appraal scheduled for 50.0 wtadpower technologes july 1992. (GEP CofiLn. ought) INDONESIA 12.0 Bodiveraley Ceervaleu B ~ediversity To be determned Wark Program To be determained (GE) (GEP Blodiverwity Consevac~on) Management plan preparatlon, funa Aprasal schduld 15.0 nd floral urveys, nstimttionalfreorms for san. 1993. Pre-Investmeot (Bank) etudy of $1.6 million has been approved by UNDP. LAO PDR g.g Wgife & Prut~ded Areas Mgm. Biadivekw ~ty To be determaed Wcrk Program (GEF) (Nadonal Toresty Management Protected areyte development Yeliow cover repor under 11.5 and Conservation) nd management traning; envronmental revision. (IDA) montoring and evaltadon and ommunty particpation in coservation program PHILIPPINEg 30. Guethrmal Emerg Deve fmt Gebet Warmiag To be det~rhed Werk Program Nal Power Corp. (GET) (Laye Cebu Geodhermal Power) C02 avo~dance through replacement PYappraa cheduled PUl. Nal O Corp. 40.0 of coel-bsed power plant with for July 1992. (GEP cofin. sougtt) geothermal energy 200.0 Bank PHILIPPINES 20.0 Ce~Lrfatioi ePri~rity B~Edvrity To be dt~rmhed Work Program Dept of Env. (GE) Pra~ Are Implementatlon of the Integrated Bank SECAL approved & Nat. Resourcn 158.0 (Environmnet ad N~aural Protected Arem Sytem to preerve and on jun 21,1991. (Bank). Raeocee Sectr Adj. Prog.) rehablitate föresth, coalreef, ad MOD Sep. 1992. 66.0 wotlands. (IDA) GLOBAL ENVIRONMENT FACILITY QUARTERLY REPORT ON INVESTMENT PROJECTS ANNEX 11-3 (As of June 15. 1992) Comaaryl Ameat($m) GEFProj GEF Implemeing & Probable (Fre&tandiagf Objective & Consmatiag Stage of Proessing * and Azency Lender Associated Bank Pro et) Project Desrptim Serviece Action on Procurement THAILAND 15.0 Electricity Conservation Global Warmng To be determined Werk Program (GEF) (To be determined) Energy end-use efficiency Appraisal scheduled 15.0 for July 1992. Pre-investment (GEP Conn. sought) study of $595,000 has been approved by UNDP. THARLAND 10.0 Forest Blodiversity Blediveusity To be determined Project Pipellae (GEF) (Land Reform and Forest Integrated community development and Project under preparation. 20.0 Protection) biodiversity protection, endangered forest (Bank) biodiversity, policy and inst. strengthenng IMNA &ECA ALGERIA 10.0 El Kale National Park Blalvenity To be determined Work Program (GEF) (Free standing project) Ramar site wetlands conservation, Project under preparation endangered species, migratory birds, Appraisal scheduled, deer, archeology for Mach 1993 BYELORUSSIA 1.0 Farest Blodiversity Blediversity To be determined Work Program (GEF) (Free standing project) Unique forest species, relic stands, air Appraisal scheduled for pollution threat, gene banks, preservation Oct. 1992 CZECHOSLOVAKIA 43 Plamnlag and Management of Biodilveralty To be determined Work Program (GEF) Caech and Slovak Reserves Esrablishing and financing sustainable Appraisal scheduled 150.0 (To be determined) network of protected areas; "Ecological for Sep. 1992 (Bank) Bank of Europe" program EGYPE 4.8 Red Sea Ceatrol Zone MgmL lateraational Waters To be determined Work Program (GEF) (Tourism Sector Restructuring & Ecotourism impact management protection 125.0 Privatization) policy and incentives for sustainable use, Yellow cover meeting on (Bank) building block for regional cooperation Aug. 28, 1992. under Red Sea convention, coral reefs IRAN 2.0 Tramsport Emergy Glbal Warming To be determined Work Program (GEF) (Free standing project) Transport fleet efficiency upgrade. Appraisal scheduled for strategic planning, global environment Sep. 1992. coefficient of urban management systems design MEDITERRANEAN 10.0 Parts Waste Disposal Iaterakmal Waters To be determined Werk Program Regional Sea (GEF) (Algeria-Third Ports Project, Coordinated regional damage control from Appraisal scheduled for Pollution Proj. Morocco-Ports Sector; oil spills and oil pollution, emergency response Nov. 30,1992. Algeria Thisia-Trans. Sector planning, strengthening regional Morocco Development Project) cooperation for marine pollution Tunisia control PAKISTAN II.0 Wate to Esrwgy System Gleti Warming To be determined Work Program ro be determined (GEF) (Punjab Urban Environ. Proj.) LAndifil gas recovery/utilization, Appraisal scheduled 100 major methane source globally for Oct. 1992 (tentative) (Bank) 30.7 (IDA) ,POLAND 25.0 Coal4o-Gas Conversion Global Warming To be determined Work Program istrict Heat (GEF) (Heat Supply Restructuring Energy efficiency, natural gas. Appraisal scheduled for 3orporation 340.0 and Conservation) small scals industry, household energy Oct. 1992. (Bank) IOMANIA .0 Danube Deba Iatrmsational Waters To be determined Work Program (GEF) (Rural Cedit Danube Delta) Wetlands management; rare European Appraisal scheduled migratory birdlife; Black Sea hydrologict for Oct. 1992 biological filter. URKEY 30 Genetke Blodiversity Bladivensity To be determined Werk Program Mallory of (GE) (East Anatolia Watersbed Preservation of predecessor genetic Apprailsal scheduled 6r. & Rural 100.0 Rehabilitation Project) stocks of new world cereals. for June 1992 fwrs, Min. (Bank) f Forestry GLOBAL ENVIRONMENT FACILIT QUARTERLY R1PORT ON INVESTMENT PROJECTS ANNEX l (A of June 15, 1992) Cou,tryl Ameemt ($m) GF Proj GEF Iffpiemtång ~Preabbe (lree..mag.w Objedea Caffsiag gineerProtessig amd IAgemer Lemder' Au*ated Bank Project} Proect Desertin Serviees A~don on Procerement LAC BOLIVIA 4.5 BEdiversöty Ceaservatie. Proj. Biedivesi To be detemined Werk Progreen 1AMA (GE) (Pree atandtag project) Proteted ara maaement. eduten Negoiations scheduled and tralning, demuadon, legislation nd policy for late ct. 1992. actiom, indigenous people knowladg systems for derig of ecoystem magemet SRAZIL 30.0 Naomal Ceservaon Uit Iediversity To be determined Werk Progree IBAMA. (GE) (NetonalEnvironment) Conservation unit, megadversity Appra1åcheduled for Dec. 1992 BRAZIL 23.0 B1mas GadEate./Ga Trtec Global WWarig To be determined Project Pipeume CIESPE (GEO) (to be dete~mined) Gsfication of low ven residucs mnd IEPS lanuary 1994 7.0 energy cop forligh efcecy (UNDP GBP TA) electicity genoration CARIBEAN 1.0 OECg/Pelation cflet ~mana.a lätetiemal W ~ter To be determtned ProjetPipeU_e REGION (GE) Waler Regionat puot port waste recepion, To be prmeented to GEP 9.0 (OE ~ Wete Management) land based.gabage. dipositon ad Plcipmntl in Dec. 1992. (IDA) ecycling, framework for regonacop. CARIBBEAN s. Wi Ca~~gh Iatlative for IZt~ra~emel W aes To be determined Projeet Pip~Hie REGION Wäste Dispoefi To be prsented to GEP (Pe etFading) Parttcipnts in Dec.1992. ECUADOR L BWIdiversety Praodu~ ledsvety To be determined Werk Program (GeF) (A Envronmet) Techical äasietance and tralning for Appr~a ~cheduled for (Bilateral preparation and exemtion of management Dec. 1992. cofinancing plans for geven con~ervation unit sought) ECUADOR 2.5 BOTROgAENDESA Afforeatation GOtalWarLg To be detmaied WorkProgram (GE) (IpC Project) Carbon sequegtration, indigenoue Appraial scheduled hardwood specis, mixed planutulti- for JUne 1992 purpse tree, privatc sector JAMAICA 3.8 Demmad Side Maagemeet Gi ~Nl Wming To be determined Preject P~peline (GE) (frec standing project) - Carbon equentration, bioma power, Appr~sal Dec. 1992 integrated danand managmnt , MEEICO 10.0 Electri Power ENd-Use EnsIemey GloblWarmbig To be determined Work Program Comieuon Fderal (GE) (PowerSector) Demonetradon of enegy efficient Apprasalächeduled de Electicidad 400.0 lighting echnologlec and organ~stonal for September 1992 (CPE) (Bank) development for program delivery ad marketing tchniqua. PRU 4.0 Trest Nd fUr Ceeservation Unt Bediversly To be determined Wrk Progrea Min. of Agr. (GO) ( -mne etanding project) Endemieffi, s~nanle protection, ApprIal echeduled 1.5 endangered spec,e hut f~d for June 1992. (conancing from IZ) 'Clansfination of CEP projWeta besed on processing statu: a) Projea in GEPWork Pogram are thasa that have been preseonted for review by Participnt at seam.ennual meetings of tie GE and have been reained for further proessing and appraisal. b) Paojects in GEP Pipeine are thoae projects whka have passd tha ghre crtical hurdces to be included in Ihe GEP Ptogram butl are not echeduled for approval before the next seminnual meeting of Pertcipänts and have not been pronented to the P urcpante for their review. The ~he hurdies lar Governmaofs formal roquevt for dht project, palng a $n.1 wee and clearance for ellgibility by the GEP Impimentation Committee. Project in this catsgory me necesarily les certain in termc of coatent and costa *an them in he GEP Work Program. mauan - ne