PROCUREMENT PLAN (Textual Part) Project information: Economic and Environmental Rehabilitation of the Niger River Project Implementation agency: Agence du Basin du Fleuve Niger Date of the Procurement Plan: 7 Fevrier 2018 Period covered by this Procurement Plan: Avril 2018 – Septembre 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. PROCUREMENT Mali : Mali - Economic & Environmental Rehabilitation of the Niger River PLAN General Information Country: Mali Bank’s Approval Date of the Original Procurement Plan: 2019-03-11 2019-07-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151909 GPN Date: Project Name: Mali - Economic & Environmental Rehabilitation of the Niger River Loan / Credit No: IDA / 62040 Executing Agency(ies): Economic and Environmental Rehabilitation of the Niger River WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-PREFEN-100539-CW- Enhancing Viability of Socio- RFB / Travaux de Economic Activities Single Stage - One En attente surcreusement du chenal de IDA / 62040 A posteriori Appel d'offres Open - National 3,200,000.00 0.00 2019-04-12 2019-04-17 2019-05-29 2019-06-28 2019-08-02 2020-01-29 Contributing to Climate Envelope d'exécution Talagneini (4 500 ml dans Change Resilience la commune de Kolongo) ML-PREFEN-100536-CW- Enhancing Viability of Socio- RFB / Travaux de Economic Activities Single Stage - One En attente IDA / 62040 A posteriori Appel d'offres Open - National 250,000.00 0.00 2019-04-12 2019-04-17 2019-05-29 2019-06-28 2019-08-02 2020-01-29 réhabilitation des quais de Contributing to Climate Envelope d'exécution Macina Change Resilience Enhancing Viability of Socio- ML-PREFEN-100548-CW- Economic Activities Single Stage - One En attente RFB / Travaux de dragage IDA / 62040 A posteriori Appel d'offres Open - National 1,197,369.00 0.00 2019-06-04 2019-06-09 2019-07-21 2019-08-20 2019-09-24 2020-05-21 Contributing to Climate Envelope d'exécution du tronçon Macina-Diafarabé Change Resilience GOODS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-PREFEN-100568-GO- RFB / Acquisition de Contingent Emergency Single Stage - One En attente IDA / 62040 A posteriori Appel d'offres Open - National 106,000.00 0.00 2019-07-02 2019-07-07 2019-08-18 2019-09-17 2019-10-31 2019-12-30 matériel et équipements pour Response Envelope d'exécution l'observatoire ML-PREFEN-100569-GO- RFB / Acquisition de 11 vehicules (deux (02)stations Single Stage - One En attente IDA / 62040 Project management A posteriori Appel d'offres Open - National 594,000.00 0.00 2019-03-05 2019-03-10 2019-04-21 2019-05-21 2019-07-04 2019-09-02 wagons et neuf (09) Pick-Up) Envelope d'exécution pour le compte de l'ABFN et l'UGP/PREEFN ML-PREFEN-100571-GO- Enhancing Viability of Socio- RFB / Acquisition Economic Activities Single Stage - One En attente d'instruments de mesure et IDA / 62040 A posteriori Appel d'offres Open - National 700,000.00 0.00 2019-05-01 2019-05-06 2019-06-17 2019-07-17 2019-08-30 2019-10-29 Contributing to Climate Envelope d'exécution de collecte de données pour Change Resilience l'ABFN ML-PREFEN-100572-GO- Enhancing Viability of Socio- RFB / Acquisition et Economic Activities Single Stage - One En attente installation de 27 balises de IDA / 62040 A posteriori Appel d'offres Open - National 325,000.00 0.00 2019-03-18 2019-03-23 2019-05-04 2019-06-03 2019-07-17 2019-09-15 Contributing to Climate Envelope d'exécution marquage et entretien pour Change Resilience 4 ans Page 1 ML-PREFEN-100765-GO- Enhancing Viability of Socio- RFB / Acquisition d'engin de Economic Activities Single Stage - One En attente prospection et de dépannage IDA / 62040 A posteriori Appel d'offres Open - National 800,000.00 0.00 2019-07-16 2019-07-21 2019-09-01 2019-10-01 2019-11-14 2020-07-11 Contributing to Climate Envelope d'exécution des bateaux en cas Change Resilience d'échouage ML-PREFEN-100766-GO- RFQ / Acquisition de Single Stage - One En attente IDA / 62040 Project management A posteriori Demande de prix Limited 36,000.00 0.00 2019-03-24 2019-05-19 2019-06-18 fournitures de bureau et Envelope d'exécution consommables informatiques ML-PREFEN-100768-GO- RFQ / Acquisition d'un Single Stage - One En attente IDA / 62040 Project management A posteriori Demande de prix Limited 40,000.00 0.00 2019-04-01 2019-05-27 2019-07-26 groupe Electrogene de 100 Envelope d'exécution KWA pour l'UGP ML-PREFEN-100769-GO- RFQ / Acquisition de quatre Single Stage - One En attente IDA / 62040 Project management A posteriori Demande de prix Limited 5,200.00 0.00 2019-04-07 2019-06-02 2019-07-02 (04) motos pour l'ABFN et Envelope d'exécution l'UGP ML-PREFEN-100772-GO- RFQ / Acquisition Single Stage - One En attente d'équipements, matériels et IDA / 62040 Project management A posteriori Demande de prix Limited 44,000.00 0.00 2019-04-01 2019-05-27 2019-07-26 Envelope d'exécution mobiliers de bureau pour l'ABFN et l'UGP NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-PREFEN-116705-NC- RFQ / Acquisition, Single Stage - One En attente installation, formation et IDA / 62040 Project management A posteriori Demande de prix Limited 40,000.00 0.00 2019-06-12 2019-07-24 2019-08-23 Envelope d'exécution suivi du logiciel de gestion pour l'ABFN et l'UGP CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-PREFEN-100793-CS- Sélection fondée QCBS / Audit Techniques En attente IDA / 62040 Project management A posteriori sur la qualité et Open - National 50,000.00 0.00 2019-07-16 2019-08-06 2019-09-19 2019-10-17 2019-11-16 2019-12-21 2020-02-03 2020-08-31 des travaux de réhabilitation d'exécution le coût des quais de Macina ML-PREFEN-100773-CS- QCBS / Recrutement d'un consultant chargé de l'étude Sélection fondée pour la conception d'un Contingent Emergency En attente IDA / 62040 A posteriori sur la qualité et Open - National 655,800.00 0.00 2019-09-03 2019-09-24 2019-11-07 2019-12-05 2020-01-04 2020-02-08 2020-03-23 2021-06-16 modèle hydrologique et Response d'exécution le coût d'amélioration des fonctions hydrologiques et écologiques du DIN ML-PREFEN-100797-CS- QCBS / Audit technique des Sélection fondée travaux de surcreusement du En attente IDA / 62040 Project management A posteriori sur la qualité et Open - National 500,000.00 0.00 2019-08-06 2019-08-27 2019-10-10 2019-11-07 2019-12-07 2020-01-11 2020-02-24 2020-09-21 chenal de Talagnei (4500ml d'exécution le coût dans la commune de Kolongo) Page 2 ML-PREFEN-100776-CS- QCBS / Recrutement d'un Consultant chargé de l'étude Sélection fondée pour l'amélioration du cadre Contingent Emergency En attente IDA / 62040 A posteriori sur la qualité et Open - National 500,000.00 0.00 2019-05-02 2019-05-23 2019-07-06 2019-08-03 2019-09-02 2019-10-07 2019-11-20 2021-02-12 institutionnel et Response d'exécution le coût règlementaire en relation avec la gestion du fleuve Niger ML-PREFEN-100777-CS- QCBS / Le recrutement d'un consultant chargé pour Sélection fondée l'Assistance technique, Contingent Emergency En attente IDA / 62040 A posteriori sur la qualité et Open - National 131,191.40 0.00 2019-06-18 2019-07-09 2019-08-22 2019-09-19 2019-10-19 2019-11-23 2020-01-06 2021-03-31 l'étude, la conception et la Response d'exécution le coût mise en place d'un observatoire de données spatiales à l'ABFN ML-PREFEN-100783-CS- QCBS / Etude de Enhancing Viability of Socio- bathymétrie et de Sélection fondée Economic Activities En attente topographie, construction et IDA / 62040 A posteriori sur la qualité et Open - National 500,000.00 0.00 2019-08-19 2019-09-09 2019-10-23 2019-11-20 2019-12-20 2020-01-24 2020-03-08 2020-12-03 Contributing to Climate d'exécution fourniture d'un model le coût Change Resilience hydraulique numérique dans le DIN ML-PREFEN-100784-CS- QCBS / Recrutement d'un bureau chargé du contrôle des travaux de réhabilitation Enhancing Viability of Socio- Sélection fondée du quai de Macina Economic Activities sur les En cours (l'élaboration des termes de IDA / 62040 A posteriori Open - National 6,000.00 0.00 2019-07-16 2019-07-30 2019-08-13 2019-08-27 2019-09-10 2020-04-07 Contributing to Climate qualifications des d'exécution références, la demande de Change Resilience consultants proposition et la sélection du bureau d'étude chargé du contrôle, publications du résultat, prise en chargé ML-PREFEN-100788-CS- QCBS / Recrutement d'un cabinet pour l'Installation et Sélection fondée Contingent Emergency En attente la configuration des IDA / 62040 A posteriori sur la qualité et Open - National 340,000.00 0.00 2019-06-18 2019-07-09 2019-08-22 2019-09-19 2019-10-19 2019-11-23 2020-01-06 2020-08-03 Response d'exécution équipements pour le coût l'observatoire, formation et transfert de technologie ML-PREFEN-100808-CS- QCBS / Programme de Sélection fondée formation et transfert de En attente IDA / 62040 Project management A posteriori sur la qualité et Open - National 75,000.00 0.00 2019-11-19 2019-12-10 2020-01-23 2020-02-20 2020-03-21 2020-04-25 2020-06-08 2021-06-08 technologie pour d'exécution le coût l'amélioration de la construction des pinasses ML-PREFEN-100801-CS- QCBS / Audit comptable et Sélection fondée financier des comptes pour sur les En attente IDA / 62040 Project management A posteriori Open - National 50,000.00 0.00 2019-11-12 2019-11-26 2019-12-10 2019-12-20 2020-01-24 2020-03-24 les exercices 2019- 2020- qualifications des d'exécution 2021 pour le compte du consultants PREEFN ML-PREFEN-100845-CS- QCBS / Programme de Sélection fondée formation et transfert de En attente IDA / 62040 Project management A posteriori sur la qualité et Open - National 125,000.00 0.00 2019-12-03 2019-12-24 2020-02-06 2020-03-05 2020-04-04 2020-05-09 2020-06-22 2021-06-22 technologie pour d'exécution le coût l'amélioration de la capacité des entreprises de dragage Page 3 ML-PREFEN-100848-CS- QCBS / la conception d'un programme de renforcement Sélection fondée des capacités et d'un En attente IDA / 62040 Project management A posteriori sur la qualité et Open - National 125,000.00 0.00 2019-12-18 2020-01-08 2020-02-21 2020-03-20 2020-04-19 2020-05-24 2020-07-07 2021-07-07 programme d'engagement des d'exécution le coût parties prenantes à la mise en oeuvre d'activités socio- économiques ML-PREFEN-100855-CS- Enhancing Viability of Socio- Sélection fondée QCBS / Recrutement d'un Economic Activities sur les En cours bureau chargé du contrôle IDA / 62040 A posteriori Open - National 3,000.00 0.00 2019-10-15 2019-10-29 2019-11-19 2019-11-26 2019-12-24 2020-09-19 Contributing to Climate qualifications des d'exécution des travaux de dragage du Change Resilience consultants tronçon Macina-Diafarabé ML-PREFEN-100857-CS- Sélection fondée QCBS / Recrutement d'un Contingent Emergency sur les En cours consultant pour la IDA / 62040 A posteriori Open - National 60,000.00 0.00 2019-10-02 2019-10-16 2019-11-06 2019-11-13 2019-12-09 2020-06-06 Response qualifications des d'examen réalisation des complements consultants d'EIES/NIES selon le cas ML-PREFEN-100861-CS- QCBS / élaboration du manuel de gestion des Enhancing Viability of Socio- Sélection fondée ressources allouées pour les Economic Activities sur les En attente IDA / 62040 A posteriori Open - National 3,000.00 0.00 2020-01-16 2020-01-30 2020-02-20 2020-02-27 2020-03-09 2020-09-05 opportunités socioéconomique Contributing to Climate qualifications des d'exécution et l'état des écosystèmes Change Resilience consultants contribuant à la résilience au changement climatique ML-PREFEN-100786-CS- QCBS / Recrutement d'un bureau chargé du Contrôle Enhancing Viability of Socio- Sélection fondée et de la surveillance des Economic Activities En attente IDA / 62040 A posteriori sur la qualité et Open - National 300,000.00 0.00 2019-06-12 2019-07-03 2019-08-16 2019-09-13 2019-10-13 2019-11-17 2019-12-31 2020-07-28 travaux de surcreusement du Contributing to Climate d'exécution le coût Chenal de Talagneini (4 500 Change Resilience ml dans la commune de Kolongo) ML-PREFEN-100805-CS- QCBS / Programme de Sélection fondée formation et transfert de En attente IDA / 62040 Project management A posteriori sur la qualité et Open - National 75,000.00 0.00 2019-10-16 2019-11-06 2019-12-20 2020-01-17 2020-02-16 2020-03-22 2020-05-05 2021-05-05 technologie pour la d'exécution le coût formalisation de l'activité des pinassiers INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-PREFEN-100546-CS- INDV / Mise en place d'un En attente IDA / 62040 Project management A posteriori Individuel Open 14,000.00 0.00 2019-05-08 2019-06-03 2019-06-10 2019-06-24 2019-08-23 système d'Archivage d'exécution (physique et éléctronique) ML-PREFEN-100525-CS- INDV / Recrutement d'un En attente Spécialiste en Développement IDA / 62040 Project management A posteriori Individuel Open 3,000.00 0.00 2019-02-19 2019-03-17 2019-03-24 2019-04-07 2020-04-06 d'exécution Social pour le compte de l'UGP ML-PREFEN-100782-CS- QCBS / Le recrutement et la prestation d'un Assistant technique visant à renforcer Contingent Emergency En attente IDA / 62040 A posteriori Individuel Limited 39,000.00 0.00 2019-05-15 2019-05-20 2019-05-27 2019-06-08 2020-09-15 les capacités de la Direction Response d'exécution Nationale des Transports Terrestres, Maritimes et Fluviaux Page 4 ML-PREFEN-100071-CS- INDV / Elaboration d'un Contingent Emergency En attente plan de communication IDA / 62040 A posteriori Individuel Open 45,000.00 0.00 2019-06-10 2019-07-08 2019-07-15 2019-08-05 2019-10-04 Response d'exécution sur la protection du fleuve du Niger Page 5