Skip to Main Navigation

Pakistan - Sixth Salinity Control and Reclamation (SCARP) Project (English)

The Sixth Salinity Control and Reclamation Project will provide for: (a) Construction of about 930 fresh groundwater tubewells and associated works for winter season irrigation and water table control. (b) Construction of about 250 saline groundwater tubewells to stabilize groundwater levels, a drainage disposal system, pumping stations and evaporation ponds; (c) An electrification network to energize all public tubewells and pumping stations on the...
See More

DETAILS

DOWNLOADS

COMPLETE REPORT

Official version of document (may contain signatures, etc)


Citation

Pakistan - Sixth Salinity Control and Reclamation (SCARP) Project (English). Washington, D.C. : World Bank Group. http://documents.worldbank.org/curated/en/539281468145159398

This document is being processed or is not available.