The World Bank Report No: ISR1703 Implementation Status & Results Sierra Leone Public Disclosure Copy INSTITUTIONAL REFORM & CAPACITY BUILDING (P078613) Operation Name: INSTITUTIONAL REFORM & CAPACITY BUILDING Project Stage: Implementation Seq.No: 12 Status: ARCHIVED Last Modified Date: 31-Jan-2011 (P078613) Country: Sierra Leone Approval FY: 2004 Product Line: IBRD/IDA Region: AFRICA Lending Instrument: Technical Assistance Loan Implementing Agency(ies): IRCBP Coordinating Unit Key Dates Board Approval Date 11-May-2004 Original Closing Date 30-Jun-2008 Planned Mid Term Review Date Last Archived ISR Date 29-Jul-2010 Effectiveness Date 06-Jul-2004 Revised Closing Date 31-Mar-2009 Actual Mid Term Review Date Project Development Objectives Project Development Objective (from Project Appraisal Document) Establishing a functioning local government system and improving the inclusiveness, transparency, and accountability of public financial management at all levels of government. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) Component Name Component Cost DECENTRALIZATION AND CAPACITY BUILDING 14.76 PUBLIC FINANCIAL MANAGEMENT REFORM 8.13 IRCBP COORDINATION 2.18 Public Disclosure Copy Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Implementation Status Overview There has been satisfactory progress in terms of agreed actions reached during the last supervision mission of June 2010. While some of the milestones have been achieved a good part of policy notes were not prepared. The Decentralization Secretary and the Local Government Finance Department has expressed commitment towards the decentralization process as demonstrated by the approval of a new Decentralization Policy and a new organogram of the Ministry of Local Government and Rural Development and the devolutions of Page 1 of 17 The World Bank Report No: ISR1703 functions to Local Councils. Fiscal Decentralization through Government allocation of grants to local councils for the period 2009-2010 has been stable but predictability of transfers is still a concern. Grant execution is at 90 % but can be improved. Public Disclosure Copy Results Project Development Objective Indicators Indicator Baseline Current End Target Indicator Name Value Value Value Number of elected local councils which are able to make development 0 19 19 plans that respond to local priorities through a participatory process. Date Date Date 15-Feb-2004 09-Dec-2010 30-Jun-2011 Type Unit of Measure Comment Comment Comment Custom Indicator Text No elected councils yet. Elections All 19 LCs have continued to 19 by end of project 06/30/2008. 5 were held in May 2004 prepare 3-year rolling development by 6/30/2005 plans linked to national PSRP and MDG goals. Indicator Baseline Current End Target Indicator Name Value Value Value Number of elected local councils which are able to make budget 0. No elected councils yet. For FY2009, the budget circular 14 by end of project 6/30/2008. 5 consistent with Section 67 of Local Government Act 2004. Elections were held in May 2004. was issued in June 2008 and in by 6/30/2005. Date December 2010 16 Councils Date prepared their 2009 budgets. The Type Unit of Measure 15-Feb-2004 budgets are in compliance with the 30-Jun-2011 Custom Indicator Text Comment LGA Act Comment Date 09-Dec-2010 Comment Public Disclosure Copy Indicator Baseline Current End Target Indicator Name Value Value Value Number of elected local councils which were able to meet the 0. No elected councils yet. 16 of 19 LCs display monthly 14 by end of project 06/30/2008. 5 transparency and the financial management accountability requirement Elections were held in May 2004. financial accounts, and all 19 by 06/30/2005. as per Local Government Act 2004 (Section 107, 81, 105). display minutes of LC meetings, Date Date and 15 display dev. plans. 13 LCs Type Unit of Measure 15-Feb-2004 prepared 2008 accounts. 30-Jun-2011 Custom Indicator Text Comment Date Comment 09-Dec-2010 Comment Page 2 of 17 The World Bank Report No: ISR1703 Indicator Baseline Current End Target Public Disclosure Copy Indicator Name Value Value Value Number of elected local councils which were able to complete the 0 18 14 by end of project 06/30/2008. projects submitted in previous year's work plan. Date Date Date 15-Feb-2004 09-Dec-2010 30-Jun-2011 Type Unit of Measure Comment Comment Comment Custom Indicator Text No elected councils yet. Elections 18 out of 19 LCs were able to were held in May 2004. complete projects included in their WPs. Projects briefs/profiles discussed and approved by Council were submitted to LGFD/ DECSEC. Indicator Baseline Current End Target Indicator Name Value Value Value Number of elected councils which were able to deliver all services 0. No elected councils yet. 14 elected councils delivery 14 by end of project devolved to them at the levels of the year before devolution. Elections were held in May 2004. services devolved. Survey (Dec Date Date 2007) shows improvement in basic education, primary health, water 30-Jun-2011 Type Unit of Measure 15-Feb-2004 and transport services since 2005 Comment Custom Indicator Text Comment in all LCs. Some evidence that access to agricultural extension declined. Date 09-Dec-2010 Comment Indicator Baseline Current End Target Public Disclosure Copy Indicator Name Value Value Value Number of elected LCs receive a tied grant for each devolved service, 0. No elected councils yet. All 19 LCs received allocated tied 19 by end of project 06/30/2008. at least that amount necessary to continue the operation and Elections were held in May 2004. grants for Q1, Q2 & Q3 of 2008. Date maintenance of that service at the standard prior to devolution. Q4 transfers were not made due to Date 30-Jun-2011 overall budget shortfall at Type Unit of Measure 15-Feb-2004 thenational level. Comment Custom Indicator Text Comment Date 09-Dec-2010 Comment Page 3 of 17 The World Bank Report No: ISR1703 Indicator Baseline Current End Target Public Disclosure Copy Indicator Name Value Value Value Percentage of donor funding captured in the fiscal reports using Donor funds are estimated in the 71% of donor funding recorded by 95% by end of project 6/30/2008. government budget classifications by program and object of budget but are not using the GoSL MoF for 2007 is integrated in 10% by 6/30/2005. expenditures. CoA and are not included in the financial reports. Only IRCB project Date fiscal reports. funding is captured despite efforts Type Unit of Measure to collect data from PIUs. 30-Jun-2011 Date Custom Indicator Text Date Comment 15-Feb-2004 Comment 09-Dec-2010 Comment Indicator Baseline Current End Target Indicator Name Value Value Value % of Vote Controllers, within 10 days after end of month, submit to the This is revision of original "% of IFMIS now generates reports on 95% by end of project 06/30/2011. FS actual revenue and expenditure for the preceding month and Vote Controllers submitted expenditures on regular basis for Date estimated revenue and expend for the month. regularly in-year and annual each MDA. budget execution reports to MoF 30-Jun-2011 Date Type Unit of Measure and the relevant ministry based on Comment new GBAA. Baseline: 0. 09-Dec-2010 Custom Indicator Text Date Comment 15-Feb-2004 Comment Indicator Baseline Current End Target Indicator Name Value Value Value In-year reports are published regularly for tracking poverty expenditure Poverty-related expenditures are Quarterly data on functional Reports on poverty-related by function. identified in the budget using the expenditures is gazetted. 2008 expenditure by function gazetted Public Disclosure Copy existing chart of accounts, and PETS was conducted and a draft quarterly by 06/30/2011. collected and reported to IMF report producedin 2008. Date Type Unit of Measure quarterly but not gazetted. Date 30-Jun-2011 Custom Indicator Text Date 09-Dec-2010 Comment 15-Feb-2004 Comment Comment Page 4 of 17 The World Bank Report No: ISR1703 Indicator Baseline Current End Target Public Disclosure Copy Indicator Name Value Value Value Percentage of recorded transactions reconciled to bank accounts Reconciliation of fiscal and banking All Bank accounts in IFMIS 95% by end of project 06/30/2008. within one month. records does not occur reconciled by the 10th of Expect 95% by end of 2005, now satisfactorily. eachmonth. IFMIShas gone live in Treasury Date Date and will automate reconciliation. Type Unit of Measure Date 15-Feb-2004 09-Dec-2010 Custom Indicator Text 30-Jun-2011 Comment Comment Comment Indicator Baseline Current End Target Indicator Name Value Value Value Public Procurement Law embracing the principles of transparency, The procurement system does not The Public Procurement Law was Public Procurement Law accountability and efficiency. contribute to full value for money passed in 2004, and regulations embracing the principles of and lacks transparency and gazetted in Sept. 2006. National transparency, accountability and accountability due to inadequate Forum on Procurement efficiency. Type Unit of Measure and weakly enforced rules and (legislativelyrequired) held in Date Custom Indicator Text procedures. October 2008. 30-Jun-2011 Date Date Comment 15-Feb-2004 09-Dec-2010 Comment Comment Indicator Baseline Current End Target Indicator Name Value Value Value Percentage of reporting entities preparing procurement plans as part of Few reporting entities currently 100% for Councils. This was a 100% by end of project the budget preparation process. prepared procurement plans. condition for Grant release by 06/30/2008. IRCBP. At the national level, 71 Public Disclosure Copy Date Date out of the 80 procuring entities Type Unit of Measure 15-Feb-2004 prepared procurement plans for 30-Jun-2011 Custom Indicator Text Comment FY2009. Comment Date 09-Dec-2010 Comment Page 5 of 17 The World Bank Report No: ISR1703 Indicator Baseline Current End Target Public Disclosure Copy Indicator Name Value Value Value Percentage of the funds provided for procurement effectively utilized. No baseline 87% in accordance with 90% by end of project 06/30/2008. Date procurement plans, 32% Date expenditure variance;and 37% 15-Feb-2004 using open competitive bidding. 30-Jun-2011 Type Unit of Measure Comment Date Comment Custom Indicator Text 09-Dec-2010 Comment Indicator Baseline Current End Target Indicator Name Value Value Value The DLC is fully operational and has become financially viable. No DLC in Sierra Leone. The DLC component has been n/a Date cancelled. As a result, this Date indicator is nolonger applicable. 15-Feb-2004 30-Jun-2011 Date Type Unit of Measure Comment Comment 09-Dec-2010 Custom Indicator Text Comment Indicator Baseline Current End Target Indicator Name Value Value Value Annual project reports to World Bank are of satisfactory quality and NA. Quarterly project reports are April 2005 and annually thereafter. provided in a timely manner. prepared and are of reasonable Date Date quality. They document progress 15-Feb-2004 and highlight challenges. Reporting 30-Jun-2011 Type Unit of Measure Comment against PDO indicators has Comment improved. Public Disclosure Copy Custom Indicator Text Date 09-Dec-2010 Comment Page 6 of 17 The World Bank Report No: ISR1703 Indicator Baseline Current End Target Public Disclosure Copy Indicator Name Value Value Value Audit reports of IRCBP are unqualified. NA Audit reports of IRCBP are Yes, annually. Date unqualified. Date 15-Feb-2004 Date 30-Jun-2011 Type Unit of Measure Comment 09-Dec-2010 Comment Custom Indicator Text Comment Indicator Baseline Current End Target Indicator Name Value Value Value All 19 elected local councils continue to meet the transparency and 19.00 19.00 19.00 the financial management accountability requirement as per Local Date Date Date Government Act 2004 (Section 107, 81, 105) 15-Feb-2004 09-Dec-2010 30-Jun-2011 Type Unit of Measure Comment Comment Comment Custom Indicator Number According to LGFD assessments 2009 and 2010, all 19 LCs met the requirement. Indicator Baseline Current End Target Indicator Name Value Value Value Number of Local Councils meeting all minimum conditions on 0.00 12.00 12.00 CLoGPAS Date Date Date 31-Jan-2006 09-Dec-2010 30-Jun-2011 Type Unit of Measure Comment Comment Comment Custom Indicator Number CLoGPAS instrument consolidated, to be finalized with Public Disclosure Copy council inputs and the field work to be done in Jan 2011 Page 7 of 17 The World Bank Report No: ISR1703 Indicator Baseline Current End Target Public Disclosure Copy Indicator Name Value Value Value Number of Local Councils meeting the threshold for the performance 16.00 16.00 18.00 measures bonus ( or Performance Incentive Grants) of CLoGPAS Date Date Date 01-Apr-2009 18-Jun-2010 31-Jan-2011 Type Unit of Measure Comment Comment Comment Custom Indicator Number The last CLoGPAS in 2009 indicated 16 LCs met the threshold. The results from the next CLoGPAS will be available later this year. The CLoGPAS report published in 2009 relates to data collected in 2008 and CLoGPAS was not done in 2009. CLoGPAS 3 is planned for 2010. The framework has been reviewed by an international consultant and the final report submitted. The next plan is to incorporate action points in the report into the framework to be followed by data collection by latest October/November 2011 Indicator Baseline Current End Target Indicator Name Value Value Value Number of Local Councils meeting all minimum conditions on 0.00 12.00 15.00 CLoGPAS (NEW) Date Date Date 01-Jan-2006 09-Dec-2010 30-Jun-2011 Type Unit of Measure Comment Comment Comment Public Disclosure Copy Custom Indicator Number Page 8 of 17 The World Bank Report No: ISR1703 Indicator Baseline Current End Target Public Disclosure Copy Indicator Name Value Value Value Number of Local Councils meeting the threshold 70% of the total for 0.00 16.00 19.00 the performance measures bonus of CLoGPAS Date Date Date 01-Jan-2006 09-Dec-2010 30-Jun-2011 Type Unit of Measure Comment Comment Comment Custom Indicator Number The last CLoGPAS in 2009 indicated 16 LCs met the threshold. The results from the next CLoGPAS will be available later this year. The CLoGPAS report published in 2009 relates to data collected in 2008 and CLoGPAS was not done in 2009. CLoGPAS 3 is planned for 2010. The framework has been reviewed by an international consultant and the final report submitted. The next plan is to incorporate action points in the report into the framework to be followed by data collection by latest October/November 2010. Indicator Baseline Current End Target Indicator Name Value Value Value Percent of general population seeing improvements in education 65.00 90.00 services Date Date Date 16-Jul-2007 09-Dec-2010 30-Jun-2011 Type Unit of Measure Comment Comment Comment Public Disclosure Copy Custom Indicator Percentage In 2008, Education 75% INPS Survey instrument has been developed. The new INPS is being carried out this year and will be available later this year. Page 9 of 17 The World Bank Report No: ISR1703 Indicator Baseline Current End Target Public Disclosure Copy Indicator Name Value Value Value Percentage of general population seeing improvments in health 56.00 84.00 services Date Date Date 16-Jul-2007 09-Dec-2010 30-Jun-2011 Type Unit of Measure Comment Comment Comment Custom Indicator Percentage In 2008, health 65% INPS Survey instrument has been developed. The new INPS is being carried out this year and will be available later this year. Intermediate Results Indicators Indicator Baseline Current End Target Indicator Name Value Value Value Intermediate outcome indicator tables attached. refer to Annex 2 of AM refer to annex 2 of AM attached Date Date Date 20-Feb-2004 09-Dec-2010 30-Jun-2011 Type Unit of Measure Comment Comment Comment Custom Indicator Text Indicator Baseline Current End Target Indicator Name Value Value Value Percent of primary schools having at least one core textbook per child 35.50 65.00 Date Date Date 01-Jan-2005 09-Dec-2010 30-Jun-2011 Type Unit of Measure Comment Comment Comment Public Disclosure Copy Custom Indicator Percentage The results are expected to be available later this year. Indicator Baseline Current End Target Indicator Name Value Value Value Percent of clinics having essential drugs 32.00 50.00 Date Date Date 01-Apr-2009 09-Dec-2010 30-Jun-2011 Type Unit of Measure Comment Comment Comment Custom Indicator Percentage Primary Health Care Survey 2005 The results are expected to be National Public Services Survey available later this year. Report Page 10 of 17 The World Bank Report No: ISR1703 Indicator Baseline Current End Target Public Disclosure Copy Indicator Name Value Value Value Decentralization policy is formulated and submitted to Cabinet. No Policy elaborated Decentralization policy approved in Decentralization policy approved Date September 2010 Date 01-Apr-2009 Date 30-Jun-2011 Type Unit of Measure Comment 09-Dec-2010 Comment Custom Indicator Text Comment The Draft Policy was revised based on the comments received and a final policy document was submitted to the Minister for onward submission to Cabinet. Thus the policy is currently with the Ministry. Indicator Baseline Current End Target Indicator Name Value Value Value The LGA 2004 is amended in line with Decentralization Policy and Contradictions in legislation Contradictions in legislation LGA and other Acts amended. sections of the Education Act, Hospitals Board Act, SALWACO Act and Date Date Date Local Tax Act that are in conflict with the LGA 04 are repealed. 01-Apr-2009 09-Dec-2010 30-Jun-2011 Type Unit of Measure Comment Comment Comment Custom Indicator Text Reviews of aws are on going and pending on the approval of the new decentralization law. Indicator Baseline Current End Target Indicator Name Value Value Value A Gender Strategy and Policy developed in support of Draft Gender Policy/Strategy Gender Policy/Strategy submitted Gender Policy/Strategy submitted decentralization. to Cabinet to Cabinet Public Disclosure Copy Date 01-Apr-2009 Date Date Type Unit of Measure Comment 09-Dec-2010 30-Jun-2011 Custom Indicator Text Comment Comment Gender Strategy prepared and validated. Page 11 of 17 The World Bank Report No: ISR1703 Indicator Baseline Current End Target Public Disclosure Copy Indicator Name Value Value Value Number of outstanding functions fully devolved according to revised 42.00 46.00 82.00 Statutory Instrument Date Date Date 01-Apr-2009 09-Dec-2010 30-Jun-2011 Type Unit of Measure Comment Comment Comment Custom Indicator Number 2004 devolution pending on As of May 10th, 2010, 46 of the 80 Statutory instrument. 37 functions functions slated in the 2004 devoted in 2007 Statutory Instrument had been devolved, with 34 remaining. Indicator Baseline Current End Target Indicator Name Value Value Value Number of LCs with fit-for-purpose constructed/renovated office 3.00 16.00 19.00 buildings Date Date Date 01-Apr-2009 09-Dec-2010 30-Jun-2011 Type Unit of Measure Comment Comment Comment Custom Indicator Number Freetown, Bo, and Makeni Cities In 2009, four LC buildings were handed over. As of up to June 22nd 2010, two more had been handed over with an additional three to be handed over. Indicator Baseline Current End Target Indicator Name Value Value Value Number of Local Councils meeting own revenue generation targets (Le 4.00 4.00 12.00 2000 per capita per year for rural councils and Le 3000 per capita per Date Date Date year for urban councils). 01-Apr-2009 09-Dec-2010 30-Jun-2011 Public Disclosure Copy Type Unit of Measure Comment Comment Comment Custom Indicator Number According to the LGFD's report in 2009, only four LCs met the targets. The 2009 report is on data relating to 2008 and 4 out of 5 urban LCs achieved the target (Makeni City, FCC, Kenema City and KNSCC).None of the District Councils achieved the set target. Page 12 of 17 The World Bank Report No: ISR1703 Indicator Baseline Current End Target Public Disclosure Copy Indicator Name Value Value Value Number of LCs complete projects included in LGDG work plan with 14.00 18.00 19.00 satisfactory financial and contract management. Date Date Date 01-Apr-2009 09-Dec-2010 30-Jun-2011 Type Unit of Measure Comment Comment Comment Custom Indicator Number In 2009 18 LCs completed. Each of the local councils with the exception of Kailahun and FCC ( Kailahun - 3 and FCC - 1) had 2 projects each funded under LGDGin 2009. 10 LCs as at June 2010 had completed at least 1 project. Indicator Baseline Current End Target Indicator Name Value Value Value Number of Local Councils with elected and trained Ward Committees 2.00 19.00 19.00 Date Date Date 01-Apr-2009 09-Dec-2010 30-Jun-2011 Type Unit of Measure Comment Comment Comment Custom Indicator Number Training in final 6 LCs completed in May.The Training Manual was revised to include two modules on Development Planning and M&E in line with keeping focus on improved service delivery under the DSDP project. Public Disclosure Copy Indicator Baseline Current End Target Indicator Name Value Value Value IEC Strategy for Decentralization is in place. None. Separate strategies done for The strategy prepared and The strategy is operational. MIALG&RD and IRCBP integrated into the annual work Date Date plan. It is operational now. 30-Jun-2011 01-Apr-2009 Date Type Unit of Measure Comment Comment 09-Dec-2010 Custom Indicator Text Comment The Consultant hired by the MIALG&RD has merged the two strategies and validation meeting on the merged strategy held. Page 13 of 17 The World Bank Report No: ISR1703 Indicator Baseline Current End Target Public Disclosure Copy Indicator Name Value Value Value Assessment from available sources (e.g GoBifo) of the extent to which decentralization 60% TBD Decentrallization 80% decentralisation has rekindled social cohesion and empowers Local Government Act 42% Local Government Act 60% Date marginalised groups in the local decision-making process Date 09-Dec-2010 Date Type Unit of Measure 15-Jun-2005 Comment 30-Jun-2011 Custom Indicator Text Comment INPS survey has been developed Comment and results expected in fist semester of 2011 Indicator Baseline Current End Target Indicator Name Value Value Value Number of LCs with regular (including random) audits of financial 0.00 19.00 19.00 management, procurement, and contract management. Date Date Date 15-Mar-2004 09-Dec-2010 30-Jun-2011 Type Unit of Measure Comment Comment Comment Custom Indicator Number 2007:Sample audits only up to All LCs have complied and submit 2004 finals statements of accounts of LCS t Audit Service on time. Opinions were finalized and issued in December 2010. Indicator Baseline Current End Target Indicator Name Value Value Value Develop guidelines for integrated Sector and Local Councils planning none A local consultant will be engaged Guidelines for integration of District and monitoring and evaluation. to carry out the task of integrating M&E into Local Council M&E Date the M&E and planning functions developed 30-Jun-2005 with a view to have a Date Type Unit of Measure Comment reportprepared by May 2011. Public Disclosure Copy 31-Jan-2011 Custom Indicator Text Guidelines for Local Council M&E Date developed Comment 09-Dec-2010 Comment TORs for consultant prepared and submitted to IPAU. Page 14 of 17 The World Bank Report No: ISR1703 Indicator Baseline Current End Target Public Disclosure Copy Indicator Name Value Value Value Respective organograms reflect new disposition as identified in none The elaboration of the new Agreed approach effected Management & Functional reviews. organogram has not been Date Date completed 01-Apr-2009 31-Jan-2011 Date Type Unit of Measure Comment Comment 18-Jun-2010 Custom Indicator Text Comment Organogram developed and submitted to Public Sector Reform Unit for review and approval. Ministry is yet to receive feedback from the PSRU. Indicator Baseline Current End Target Indicator Name Value Value Value Appropriate staff recruitment/deployment of civil servants effected. none Not done Agreed approach effected Date Date Date 01-Apr-2009 09-Dec-2010 30-Jun-2011 Type Unit of Measure Comment Comment Comment Custom Indicator Text This is pending on the final organogram. Indicator Baseline Current End Target Indicator Name Value Value Value Staff/systems development programme elaborated none Agreed approach effected Date Date Date 01-Apr-2009 09-Dec-2010 30-Jun-2011 Public Disclosure Copy Type Unit of Measure Comment Comment Comment Custom Indicator Text This is pending on the final organogram. Page 15 of 17 The World Bank Report No: ISR1703 Indicator Baseline Current End Target Public Disclosure Copy Indicator Name Value Value Value DecSec/LGFD coaching and mentoring of identified Ministry staff none Agreed approach effected conducted in accordance with schedule. Date Date Date 01-Apr-2009 09-Dec-2010 30-Jun-2011 Type Unit of Measure Comment Comment Comment Custom Indicator Text This is pending on the final organogram. Data on Financial Performance (as of 21-Jan-2011) Financial Agreement(s) Key Dates Project Loan No. Status Approval Date Signing Date Effectiveness Date Closing Date P078613 IDA-H0860 Closed 11-May-2004 18-May-2004 06-Jul-2004 31-Mar-2009 P078613 TF-55391 Closed 31-Aug-2005 31-Aug-2005 31-Aug-2005 31-Mar-2009 P078613 TF-56653 Closed 21-Jul-2006 21-Jul-2006 21-Jul-2006 31-Jan-2011 P078613 TF-57251 Closed 24-Oct-2006 24-Oct-2006 24-Oct-2006 24-Oct-2010 Disbursements (in Millions) Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P078613 IDA-H0860 Closed USD 25.12 25.08 0.04 25.06 0.00 100.00 P078613 TF-55391 Closed USD 0.92 0.88 0.04 0.88 0.00 100.00 P078613 TF-56653 Closed USD 9.47 9.47 0.00 21.50 2.27 227.00 P078613 TF-57251 Closed USD 0.88 0.88 0.00 0.88 0.00 100.00 Disbursement Graph Public Disclosure Copy Page 16 of 17 The World Bank Report No: ISR1703 Public Disclosure Copy Key Decisions Regarding Implementation None Restructuring History CD Approved on 28-Feb-2008 Related Projects There are no related projects. Public Disclosure Copy Page 17 of 17