PROCUREMENT PLAN (Textual Part) Project information: Greater Accra Resilient Integrated Development (GARID) Project- [P-164330] Project Implementation agency: Ministry of Works and Housing Date of the Procurement Plan: March 28, 2018 Period covered by this Procurement Plan: January to December, 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [Ghana Public Procurement Act 663, amended with Act 914 ], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. a. Open advertising of the procurement opportunity at the national level; b. The procurement is open to eligible firms from any country; c. The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti- Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. Contracts with an appropriate allocation of responsibilities, risks, and liabilities; e. Publication of contract award information; f. Rights for the Bank to review procurement documentation and activities; g. An effective complaints mechanism; and h. Maintenance of records of the Procurement Process. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. N/A Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables N/A Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables]; Works: is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. Other Relevant Procurement Information. . PROCUREMENT Ghana : Greater Accra Resilient and Integrated Development Project PLAN General Information Country: Ghana Bank’s Approval Date of the Original Procurement Plan: 2018-04-10 2021-04-27 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P164330 GPN Date: Project Name: Greater Accra Resilient and Integrated Development Project Loan / Credit No: IDA / V1450, IDA / 64100 Ministry of Works and Housing Executing Agency(ies): WORKS Procureme Activity Reference No. / Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH nt Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) Justification for Award Type Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GH-MWH-96706-CW-RFQ / Component 4: Project Request for Single Stage - One 2019-06- Rehabilitation of Project Office IDA / V1450 Post Open - National 0.00 Canceled 2019-02-10 2019-04-07 Management Quotations Envelope 06 (PCU) GH-MWH-96639-CW-RFB / Construction of Detention Component 1: Climate Single Stage - Two 2023-04- Ponds, Sand Traps, and IDA / V1450 Resilient Drainage and Flood Prior Request for Bids Open - International 0.00 Canceled 2020-11-25 2020-11-30 2021-01-11 2021-03-26 2021-04-30 Envelope 20 Urgent Repairs Networks in Mitigation Measures Odaw Drainage Basin. GH-MWH-145711-CW-RFQ / Component 4: Project Request for Single Stage - One 2020-07- 2020- IDA / V1450 Post Limited 16,749.88 Completed 2019-12-05 2019-11-27 2020-01-30 2020-01-24 Paving of PCU car park Management Quotations Envelope 28 07-13 GH-MWH-145710-CW-RFQ / Component 4: Project Request for Single Stage - One 2020-11- Installation and Networking of IDA / V1450 Post Limited 0.00 Canceled 2020-04-04 2020-05-30 Management Quotations Envelope 26 PCU Offices GH-MWH-96698-CW-RFB / Component 1: Climate Dredging of Odaw River Main Request for 2025-05- IDA / V1450 Resilient Drainage and Flood Prior Open - International Multi Stage 0.00 Canceled 2020-08-31 2020-11-16 2020-11-16 2020-09-05 2021-01-25 2021-05-09 2021-06-13 Channel and Selected Proposals 23 Mitigation Measures Tributaries and Clearing GH-MWH-96703-CW-RFB / Component 1: Climate Reconstruction of three(3) Single Stage - One 2022-12- IDA / V1450 Resilient Drainage and Flood Prior Request for Bids Open - National 0.00 Canceled 2020-12-28 2021-01-02 2021-02-13 2021-03-15 2021-04-19 Bridges, Demolishing of Envelope 10 Mitigation Measures two(2) Foot Bridges GH-MWH-103675-CW-RFP / Component 1: Climate Request for Single Stage - One 2019-05- Rehabilitation of Project Office IDA / V1450 Resilient Drainage and Flood Post Limited 0.00 Canceled 2019-03-30 2019-04-26 Quotations Envelope 26 (PCU). Mitigation Measures GH-MWH-96642-CW-RFB / Component 1: Climate Construction of Detention Single Stage - One 2022-10- IDA / V1450 Resilient Drainage and Flood Prior Request for Bids Open - National 0.00 Canceled 2021-01-27 2021-02-01 2021-03-03 2021-04-02 2021-05-07 ponds at Atomic East (Off- Envelope 29 Mitigation Measures line) and Atomic West (in-line) GH-MWH-181877-CW-RFQ / Component 4: Project Request for Single Stage - One 2021-01- Extension works to PCU IDA / 64100 Post Limited 170,136.03 Signed 2020-08-22 2020-08-21 2020-10-17 2020-11-23 Management Quotations Envelope 15 Offices at PWD Head Office GH-MWH-171491-CW-RFB / Component 1: Climate Pending Procurement of a contractor Single Stage - One 2022-02- IDA / 64100 Resilient Drainage and Flood Post Request for Bids Open - National 0.00 Implementat 2020-12-10 2020-12-15 2021-01-05 2021-01-19 2021-02-09 to evacuate dredged materials Envelope 09 Mitigation Measures ion from Site B to Anyaa Site GH-MWH-207506-CW-RFP / Component 1: Climate Under Dredging of Odaw River Main Request for Single Stage - Two 2025-07- IDA / 64100 Resilient Drainage and Flood Prior Open - International 0.00 Implementat 2020-12-22 2021-03-09 2021-03-09 2021-03-09 2020-12-27 2021-04-08 2021-05-18 2021-09-04 Channel and Selected Proposals Envelope 05 Mitigation Measures ion Tributaries and Clearing GH-MWH-219660-CW-RFB / Component 1: Climate Pending Single Stage - One 2023-04- Rehabilitation of Weir in the IDA / 64100 Resilient Drainage and Flood Post Request for Bids Open - National 0.00 Implementat 2021-12-20 2021-12-25 2022-02-05 2022-03-07 2022-04-11 Envelope 16 Korle Lagoon Mitigation Measures ion GH-MWH-219663-CW-RFB / Reconstruction of Three Component 1: Climate Pending Single Stage - One 2022-05- Vehicular Bridges and IDA / 64100 Resilient Drainage and Flood Prior Request for Bids Open - National 0.00 Implementat 2021-12-20 2021-12-25 2022-02-05 2022-03-07 2022-04-11 Envelope 29 Demolition of Two Foot Mitigation Measures ion Bridges. GH-MWH-219664-CW-RFB / Component 1: Climate Pending Construction of Offline and In- Single Stage - One 2023-10- IDA / 64100 Resilient Drainage and Flood Prior Request for Bids Open - National 0.00 Implementat 2021-12-20 2021-12-25 2022-02-05 2022-03-07 2022-04-11 line Detention Ponds at Envelope 23 Mitigation Measures ion Atomic East and Atomic West. GH-MWH-219669-CW-RFB / Construction of Sand Traps Component 1: Climate Pending Single Stage - One 2024-04- and Urgent Repair Works on IDA / 64100 Resilient Drainage and Flood Prior Request for Bids Open - National 0.00 Implementat 2021-12-15 2021-12-20 2022-01-31 2022-03-02 2022-04-06 Envelope 05 the Odaw drains, Nima Drains Mitigation Measures ion and sea outlet GH-MWH-219654-CW-RFB / Procurement of a contractor Component 1: Climate Pending Single Stage - One 2022-01- for the improvement of IDA / 64100 Resilient Drainage and Flood Post Request for Bids Open - National 0.00 Implementat 2021-04-27 2021-05-02 2021-06-13 2021-07-13 2021-08-17 Envelope 14 Access to the Final Disposal Mitigation Measures ion site at Amuman GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GH-MWH-56616-GO-RFQ / Procurement of 3No Component 1: Climate Request for Single Stage - One Executive L' shape Tables, IDA / V1450 Resilient Drainage and Flood Prior Limited 0.00 Canceled 2018-04-12 2018-06-07 2018-12-04 Quotations Envelope 3No Office Desk, 5No Mitigation Measures Executive Chairs. Page 1 GH-MWH-56618-GO-RFB / Component 1: Climate Single Stage - One Procurement of 5No, Saloon IDA / V1450 Resilient Drainage and Flood Prior Request for Bids Open - National 0.00 Canceled 2018-04-10 2018-04-15 2018-05-27 2018-06-26 2018-07-31 2019-01-27 Envelope Vehicles Mitigation Measures GH-MWH-56619-GO-RFQ / Procurement of 3No Desktop Computers and Accessories, Component 1: Climate Request for Single Stage - One 20No Laptop Computers, 5No IDA / V1450 Resilient Drainage and Flood Prior Limited 0.00 Canceled 2018-04-14 2018-06-09 2018-12-06 Quotations Envelope Printers, 5No Scanners, 1No Mitigation Measures Photocopiers, 5No Digital Cameras, 2No Projectors. GH-MWH-56620-GO-RFQ / Component 1: Climate Request for Single Stage - One Procurement Of Equipment IDA / V1450 Resilient Drainage and Flood Prior Limited 0.00 Canceled 2018-04-18 2018-06-13 2018-12-10 Quotations Envelope For Improving Monitoring Mitigation Measures GH-MWH-96537-GO-RFB / Procurement of Vehicles (6 Component 1: Climate Under Single Stage - One No,s Double Cabin Pick- up , IDA / V1450 Resilient Drainage and Flood Post Request for Bids Open - National 0.00 Implementati 2019-03-04 2019-04-08 2019-03-09 2019-04-20 2019-05-20 2019-06-24 2019-12-21 Envelope 1 No. Salon Car and 1 No. Mitigation Measures on Motor Bike) GH-MWH-103671-GO-RFB / Procurement of Vehicles (6 Component 1: Climate Request for Single Stage - One Nos Double Cabin Pick-Up, IDA / V1450 Resilient Drainage and Flood Post Limited 0.00 Canceled 2019-03-30 2019-04-26 2019-05-26 Quotations Envelope 1No. Saloon and 1No. Motto Mitigation Measures Bike. GH-MWH-96524-GO-RFB / Component 1: Climate Procurement of light imaging, Single Stage - One IDA / V1450 Resilient Drainage and Flood Post Request for Bids Open - National 0.00 Canceled 2019-09-02 2019-09-07 2019-10-19 2019-11-18 2019-12-23 2020-01-22 Detection and Ranging ( Envelope Mitigation Measures LIDAR/DEM) GH-MWH-137038-GO-RFQ / Procurement of 1 No Double Component 4: Project Request for Single Stage - One Cabin Pick- up and 4 No IDA / V1450 Post Limited 272,709.36 Completed 2019-11-29 2019-11-27 2020-01-24 2020-03-23 2020-02-28 2020-04-30 Management Quotations Envelope Medium Cross country vehicles for PCU GH-MWH-137042-GO-RFQ / Procurement of Office Furniture for PCU comprising 9 No. Desks, 4 No. Steel wide Component 4: Project Request for Single Stage - One cabinets for Arch Files, 8 No. IDA / V1450 Post Limited 16,924.54 Completed 2019-11-29 2019-11-27 2020-01-24 2020-01-24 2020-02-28 2020-02-05 Management Quotations Envelope Medium Steel cabinets with drawers, 1 No. workstation, wooden bookshelves, 18No. Visitors chairs GH-MWH-137050-GO-RFQ / Procurement of Computers and Accessories comprising 6 No. Laptop Computers and Component 4: Project Request for Single Stage - One accessories, 2No. Desktop IDA / V1450 Post Limited 57,098.75 Completed 2019-11-25 2019-11-27 2020-01-20 2020-03-23 2020-02-28 2020-06-01 Management Quotations Envelope computers, 2 No. Photocopiers, 3 No. Scanners, 3 No printers, 1No. Project with screen GH-MWH-137043-GO-RFQ / Procurement of Office equipment comprising 9 sets of Staple machines, Component 4: Project Request for Single Stage - One Perforator, Filing trays, Filing IDA / V1450 Post Limited 3,018.34 Completed 2019-11-29 2019-11-27 2020-01-24 2020-01-24 2020-02-28 2020-02-05 Management Quotations Envelope trays, waste bins, 3No paper shredders, 1No. Comb binding machine, 1No cash safe, 3No. Small size fridges. GH-MWH-161187-GO-RFQ / Procurement of Survey Component 1: Climate Equipment for the Supervision Request for Single Stage - One IDA / 64100 Resilient Drainage and Flood Post Open - National 0.00 Canceled 2020-07-20 2020-09-14 2020-12-13 of dredging Works by Quotations Envelope Mitigation Measures Hydrological Services Department (HSD) GH-MWH-161017-GO-RFQ / Component 1: Climate Procurement of Office Request for Single Stage - One IDA / 64100 Resilient Drainage and Flood Post Limited 0.00 Canceled 2020-06-30 2020-08-25 2020-09-24 Furniture for 5 contract staff Quotations Envelope Mitigation Measures Recruited for GARID PIUs GH-MWH-178464-GO-RFQ / Procurement of 4Nos. Double Component 1: Climate Cabin Pick Ups for the Project Request for Single Stage - One IDA / 64100 Resilient Drainage and Flood Post Limited 178,996.99 Completed 2020-08-01 2020-07-07 2020-09-19 2020-10-07 2020-12-18 2020-12-08 Implementation Units for the Quotations Envelope Mitigation Measures four Ministries- MWH,MSWR,MLGRD,MIZD) GH-MWH-161013-GO-RFQ / Procurement of Office Equipment (2 No. Laptop, 1 Component 1: Climate Request for Single Stage - One No. Heavy Duty Photocopier IDA / 64100 Resilient Drainage and Flood Post Limited 7,439.18 Completed 2020-08-01 2020-11-06 2020-09-12 2020-09-07 2020-11-11 2020-09-15 Quotations Envelope Machines, 1 No. Heavy Duty Mitigation Measures Colour Printer and Accessories, 2 Nos Cabinet,) GH-MWH-161016-GO-RFQ / Procurement of Stationery and Consumables (100 boxes A4 Papers, 10No. Staplers, 20 Component 1: Climate Pkt Paper Clips, 3No. Request for Single Stage - One IDA / 64100 Resilient Drainage and Flood Post Limited 8,946.22 Completed 2020-08-14 2020-11-17 2020-10-09 2020-08-24 2020-11-08 2020-08-26 Calculators, 1No. Electronic Quotations Envelope Mitigation Measures Binding Machine, 10 Cabinets, 1No. Electronic Perforator, 1No. Manual Perforator), 5 No, File trays etc GH-MWH-204957-GO-RFB / Procurement of Survey Component 1: Climate Under Equipment and Drone for Single Stage - One IDA / 64100 Resilient Drainage and Flood Post Request for Bids Open - National 0.00 Implementati 2020-11-30 2020-12-21 2020-12-05 2020-12-21 2021-01-16 2021-02-15 2021-03-22 2021-09-18 Supervision of Dredging Envelope Mitigation Measures on Works by Hydrological Services Department (HSD) Page 2 GH-MWH-187078-GO-RFQ / Procurement of Automatic Component 1: Climate Request for Single Stage - One Weather Stations and IDA / 64100 Resilient Drainage and Flood Post Limited 83,790.94 Signed 2020-12-05 2020-11-23 2021-01-30 2021-03-12 2021-07-29 Quotations Envelope Meteorological Equipment for Mitigation Measures GMet GH-MWH-204958-GO-RFQ / Component 1: Climate Procurement of Information, Request for Single Stage - One IDA / 64100 Resilient Drainage and Flood Post Limited 3,400.73 Signed 2020-12-05 2020-12-24 2021-01-30 2021-03-11 2021-07-29 Education and Communication Quotations Envelope Mitigation Measures Materials in 2 Lots GH-MWH-204962-GO-RFQ / Procurement and Installation Component 1: Climate Request for Single Stage - One of Hydromet Equipment for IDA / 64100 Resilient Drainage and Flood Post Limited 92,968.82 Signed 2020-12-05 2020-11-23 2021-01-30 2021-03-12 2021-07-29 Quotations Envelope Hydrological Services Mitigation Measures Department GH-MWH-187061-GO-RFQ / Procurement of Computers, Component 4: Project Request for Single Stage - One printers and accessories for IDA / 64100 Post Limited 37,274.90 Completed 2020-12-05 2020-11-23 2021-01-30 2020-12-29 2021-04-30 2021-01-29 Management Quotations Envelope additional project Specialists for PIUs. GH-MWH-219686-GO-RFQ / Component 1: Climate Pending Procurement of 2Nos. double Request for Single Stage - One IDA / 64100 Resilient Drainage and Flood Post Limited 0.00 Implementati 2021-05-14 2021-06-25 2021-08-24 Cabin Pick ups for Monitoring Quotations Envelope Mitigation Measures on of Fews Network GH-MWH-219700-GO-RFQ / Procurement of 6No. Laptop Computers and 3No. Desktop Computers and Component 1: Climate Pending Request for Single Stage - One Accessories,5No. Printers(All- IDA / 64100 Resilient Drainage and Flood Post Limited 0.00 Implementati 2021-04-05 2021-05-17 2021-07-16 Quotations Envelope in 1),2No. Heavy Duty Mitigation Measures on Photocopier Machine,4No. Heavy duty Shredder,2No digital Cameras NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GH-MWH-122693-NC-RFB / Mapping of the Odaw Drainage Basin using Light Component 1: Climate Imaging Detection and Single Stage - One IDA / V1450 Resilient Drainage and Flood Post Request for Bids Open - National 1,591,627.00 Signed 2019-07-30 2019-08-20 2019-08-04 2019-11-27 2019-09-15 2020-01-06 2019-10-15 2020-05-06 2019-11-19 2020-08-24 2020-07-16 Ranging (LiDAR/DEM) Envelope Mitigation Measures technology and production of digital colour orthophoto maps GH-MWH-124174-NC-RFP / Development, Implementation, operation Component 1: Climate and Hand-over of Flood Early Request for Single Stage - Two IDA / V1450 Resilient Drainage and Flood Prior Open - International 0.00 Canceled 2021-01-20 2021-01-25 2021-03-08 2021-05-21 2021-06-25 2023-12-12 Warning Response System Proposals Envelope Mitigation Measures (FEWS) Accra, including procurement and installation of equipment and training. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GH-MWH-56565-CS-CQS / Consultancy services for the Component 1: Climate Consultant study to identify sustainable IDA / V1450 Resilient Drainage and Flood Prior Qualification Limited 0.00 Canceled 2018-04-20 2018-08-30 2018-05-04 2018-06-03 2018-07-08 2019-01-04 option for disposing dredged Mitigation Measures Selection materials GH-MWH-56568-CS-CQS / Consultancy Service for Component 2: Solid Waste Consultant Feasibility and Design Studies IDA / V1450 Management Capacity Prior Qualification Open - National 0.00 Canceled 2018-04-17 2018-05-08 2018-06-21 2018-07-21 2018-08-25 2019-02-21 for Designing Integrated Solid Improvements Selection Waste Management GH-MWH-56573-CS-CQS / Component 2: Solid Waste Consultant Consultancy Service for IDA / V1450 Management Capacity Prior Qualification Open - National 0.00 Canceled 2018-04-12 2018-08-23 2018-05-03 2018-06-16 2018-07-16 2018-08-20 2019-02-16 detailed Engineering Design Improvements Selection of Transfer Stations. GH-MWH-66198-CS-CQS / Consultancy Services for Component 2: Solid Waste Consultant Under Environmental and Social IDA / V1450 Management Capacity Prior Qualification Limited 0.00 2018-06-11 2018-06-19 2018-06-21 2018-06-23 2018-07-15 2018-08-03 2018-11-01 Implementation Impact Assessment(ESIA) for Improvements Selection Capping Component 3: Participatory GH-MWH-56589-CS-CQS / Upgrading of Targeted Flood Consultant Consultancy Services For IDA / V1450 Prone Low-income Prior Qualification Limited 0.00 Canceled 2018-04-16 2018-04-30 2018-05-30 2018-07-04 2018-12-31 Procurement on Community Communities and Local Selection Liaisons Government Support GH-MWH-80965-CS-CQS / Component 2: Solid Waste Consultant Consultancy Services to Under IDA / V1450 Management Capacity Post Qualification Open - National 0.00 2018-10-08 2019-07-25 2018-10-29 2019-08-30 2018-12-12 2019-10-29 2018-12-19 2019-01-02 2019-07-01 Improving Waste Management Implementation Improvements Selection in Low Income Communities. GH-MWH-56593-CS-CQS / Consultancy Service for Consultant Component 4: Project Preparation of ESIA, RAP, ESMF IDA / V1450 Prior Qualification Open - National 0.00 Canceled 2018-04-13 2018-05-31 2018-05-04 2018-06-17 2018-07-17 2018-08-21 2019-02-17 Management and RPF and Socioeconomic Selection Assessment and Survey Page 3 GH-MWH-56611-CS-CQS / Consultant Consultancy Service for Component 4: Project Under IDA / V1450 Post Qualification Limited 0.00 2018-04-23 2018-05-07 2018-06-06 2018-07-11 2019-01-07 Project Implementation Management Implementation Selection Manual. GH-MWH-56561-CS-CQS / Consultancy Service for preparatory studies for Component 1: Climate Consultant improving flood, drain, IDA / V1450 Resilient Drainage and Flood Post Qualification Limited 0.00 Canceled 2018-04-12 2018-04-26 2018-05-26 2018-06-30 2018-12-27 wetland and retention basins Mitigation Measures Selection management, including land ownership, enforcement, operation and mantianance GH-MWH-56601-CS-CQS / Consultant Consultant Service to Publish, Component 4: Project IDA / V1450 Post Qualification Limited 0.00 Canceled 2018-04-10 2018-04-24 2018-05-24 2018-06-28 2018-12-25 Print and Disseminate the Management Selection report. GH-MWH-56622-CS-CQS / Consultancy Service to Consultant Component 4: Project Conduct a Sensitization and IDA / V1450 Post Qualification Limited 0.00 Canceled 2018-04-17 2018-05-01 2018-05-31 2018-07-05 2019-01-01 Management Readiness Assessment Study Selection within the Project Area GH-MWH-56595-CS-CQS / Consultant Consultancy Service for Component 4: Project IDA / V1450 Post Qualification Limited 0.00 Canceled 2018-04-25 2018-05-09 2018-06-08 2018-07-13 2019-01-09 finalization of the Management Selection Metropolitan Study Report GH-MWH-96509-CS-INDV / Consultancy Services for Component 1: Climate Consultant Environmental, Social Impact Under IDA / V1450 Resilient Drainage and Flood Post Qualification Open - National 0.00 2019-09-02 2019-08-20 2019-09-23 2019-10-25 2019-11-06 2019-11-27 2019-12-06 2020-12-22 2020-01-10 2020-07-08 Assessment(ESIA) for Implementation Mitigation Measures Selection Detention Ponds, Urgent Repairs and Bridges GH-MWH-103660-CS-CQS / Component 1: Climate Consultant Consultancy Services - IDA / V1450 Resilient Drainage and Flood Post Qualification Open - National 0.00 Canceled 2019-05-08 2019-05-29 2019-07-12 2019-08-11 2019-09-15 2019-10-15 Supervision of FEWS- Accra. Mitigation Measures Selection Component 3: Participatory GH-MWH-56592-CS-CQS / Upgrading of Targeted Flood Consultant Consultancy Services For IDA / V1450 Prone Low-income Post Qualification Open - National 0.00 Canceled 2018-04-19 2018-05-10 2018-06-23 2018-07-23 2018-08-27 2019-02-23 Rapid Assessment on Housing Communities and Local Selection and Resettlement Options Government Support Component 3: Participatory GH-MWH-56579-CS-CQS / Upgrading of Targeted Flood Consultant Consultancy Service for Land IDA / V1450 Prone Low-income Post Qualification Open - National 0.00 Canceled 2018-10-26 2018-10-26 2018-10-26 2018-10-26 2018-10-26 2018-10-26 Ownership Mapping and Communities and Local Selection Access to Land Study Government Support Component 3: Participatory GH-MWH-56581-CS-CQS / Upgrading of Targeted Flood Consultant Consultancy Service for IDA / V1450 Prone Low-income Prior Qualification Open - National 0.00 Canceled 2018-04-26 2018-10-01 2018-05-17 2018-06-30 2018-07-21 2018-08-18 2019-02-14 Community Profiling and Communities and Local Selection Enumeration Government Support GH-MWH-123092-CS-QCBS / Consulting Services for Preparation of Community Component 3: Participatory Facilitation, Planning, Upgrading of Targeted Flood Quality And Cost- Under Preliminary and Detailed IDA / V1450 Prone Low-income Prior Open - International 0.00 2019-10-15 2020-01-29 2019-11-05 2020-02-04 2019-12-19 2020-12-19 2020-01-16 2021-02-12 2020-02-15 2021-03-09 2020-03-21 2020-04-25 2021-03-06 Based Selection Implementation Engineering Design and Communities and Local Construction Supervision and Government Support Contract Management for 3 Communities GH-MWH-145641-CS-QCBS / Consultancy Service for Component 1: Climate Detailed Engineering Design Quality And Cost- IDA / V1450 Resilient Drainage and Flood Prior Open - International 1,020,728.88 Signed 2019-11-20 2019-12-18 2019-12-11 2019-12-20 2020-01-24 2020-03-19 2020-02-21 2020-06-03 2020-03-22 2021-02-12 2020-04-26 2021-02-22 2020-05-31 2021-03-23 2022-05-31 for Detention Ponds, Bridge Based Selection Mitigation Measures Reconstruction and Urgent Repairs. GH-MWH-145730-CS-LCS / Consulting Services for the Component 4: Project Least Cost preparation of Online IDA / V1450 Post Open - National 29,800.00 Signed 2019-12-05 2020-03-25 2019-12-26 2020-02-08 2020-06-04 2020-03-07 2020-07-20 2020-04-06 2020-09-02 2020-05-11 2020-10-27 2020-06-15 2020-12-28 2020-12-12 Management Selection Grievances Redress Mechanism GH-MWH-145703-CS-CQS / Consultant Component 4: Project Development of Website and IDA / V1450 Post Qualification Open - National 18,020.87 Signed 2019-11-25 2019-12-16 2019-12-16 2020-01-29 2020-03-24 2020-02-28 2020-06-10 2020-04-03 2020-06-30 2020-09-30 Management hosting for GARID Project Selection GH-MWH-56465-CS-QCBS / Consultancy Service for Component 1: Climate Detailed Engineering Design Quality And Cost- IDA / V1450 Resilient Drainage and Flood Prior Open - International 0.00 Canceled 2019-09-02 2019-05-15 2019-09-23 2019-11-06 2019-12-04 2020-01-03 2020-02-07 2020-03-13 2021-03-13 for Detention Ponds, Bridge Based Selection Mitigation Measures Reconstruction and Urgent Repairs. Component 3: Participatory GH-MWH-56586-CS-CQS / Upgrading of Targeted Flood Consultant Consultancy Service for IDA / V1450 Prone Low-income Post Qualification Open - National 0.00 Canceled 2020-04-15 2020-05-06 2020-06-19 2020-07-19 2020-08-23 2021-02-19 Strategy on Livelihoods Communities and Local Selection Restoration and Enhancement Government Support GH-MWH-145638-CS-QCBS / Design and Supervision of Flood Early Warning Response Component 1: Climate Quality And Cost- System (FEWS) Accra, IDA / V1450 Resilient Drainage and Flood Prior Open - International 798,482.88 Signed 2019-11-29 2019-12-04 2019-12-20 2019-12-10 2020-02-02 2021-01-28 2020-03-01 2021-01-03 2020-03-31 2021-01-28 2020-05-05 2021-01-29 2020-06-09 2021-02-10 2023-01-30 Based Selection including the development of Mitigation Measures CONOPS for HSD, GMet and NADMO GH-MWH-123083-CS-QCBS / Design and Supervision of Flood Early Warning Response Component 1: Climate Quality And Cost- System (FEWS) Accra, IDA / V1450 Resilient Drainage and Flood Prior Open - International 0.00 Canceled 2019-07-30 2019-09-06 2019-08-20 2019-10-03 2019-10-31 2019-11-30 2020-01-04 2020-02-08 2022-09-30 Based Selection including the development of Mitigation Measures CONOPS for HSD, GMet and NADMO Page 4 GH-MWH-148850-CS-LCS / Component 2: Solid Waste Procurement of a Transaction Quality And Cost- IDA / V1450 Management Capacity Post Open - International 0.00 Canceled 2020-01-30 2020-02-20 2020-04-04 2020-05-02 2020-06-01 2020-07-06 2020-08-10 2021-08-10 Advisor for PPP for Landfill Based Selection Improvements Site GH-MWH-145704-CS-QCBS / Consultancy Service for Component 2: Solid Waste Quality And Cost- Studies and PreliminaryDesign IDA / V1450 Management Capacity Post Open - National 0.00 Canceled 2019-12-10 2019-12-31 2020-02-13 2020-03-12 2020-04-11 2020-05-16 2020-06-20 2021-06-20 Based Selection for Solid Waste Management Improvements towards PPP GH-MWH-145732-CS-LCS / Component 3: Participatory Consulting Services for the Upgrading of Targeted Flood Least Cost Development of a Geospatial IDA / V1450 Prone Low-income Post Open - National 0.00 Canceled 2019-11-30 2019-12-21 2020-02-03 2020-03-02 2020-04-01 2020-05-06 2020-06-10 2021-01-06 Selection Asset Management System for Communities and Local the MMDAs. Government Support GH-MWH-160874-CS-LCS / Preparation of Gender-Based Component 1: Climate Violence Services Mapping Quality And Cost- IDA / 64100 Resilient Drainage and Flood Post Open - National 107,059.90 Signed 2020-04-10 2020-04-25 2020-05-01 2020-06-22 2020-06-14 2020-08-10 2020-07-04 2020-09-10 2020-07-25 2020-09-29 2020-08-22 2021-01-10 2020-09-12 2021-03-19 2021-01-10 and Gender-Based Violence Based Selection Mitigation Measures Training of Project Stakeholders GH-MWH-160863-CS-LCS / Consulting Service for the Component 1: Climate Preparation of Resettlement Least Cost Under IDA / 64100 Resilient Drainage and Flood Post Open - National 0.00 2020-05-05 2020-09-10 2020-05-26 2020-11-05 2020-07-09 2021-01-05 2020-07-30 2020-08-19 2020-09-16 2020-10-21 2021-02-18 Action Plan for Deferred and Selection Implementation Mitigation Measures Routine Maintenance Dredging Odaw Drainage Basin GH-MWH-160872-CS-LCS / Consulting Service for the Engagement of a Non- Governmental Organisation for Stakeholder and Component 1: Climate Community Engagement for Least Cost IDA / 64100 Resilient Drainage and Flood Post Open - National 0.00 Canceled 2020-05-05 2020-05-22 2020-05-26 2020-07-09 2020-07-23 2020-08-06 2020-09-10 2020-10-01 2021-03-30 the Deferred and Routine Selection Mitigation Measures Maintenance Dredging Odaw Drainage Basin, Construction of Detention Ponds, Sand Traps, Reconstruction of bridges GH-MWH-177995-CS-LCS / Consultancy Services for Preparation of Environmental, Component 1: Climate Least Cost Under Social Impact Assessment IDA / 64100 Resilient Drainage and Flood Post Open - National 0.00 2020-08-25 2020-09-14 2020-09-15 2020-10-29 2020-11-12 2020-11-26 2020-12-31 2021-01-28 2021-07-27 Selection Implementation (ESIA)/ Resettlement Action Mitigation Measures Plan for final disposal of dredge material- Amuman GH-MWH-160860-CS-LCS / Consulting Service for the Preparation of Resettlement Action Plan for the Component 1: Climate Least Cost Under construction of Sand Traps, IDA / 64100 Resilient Drainage and Flood Post Open - National 0.00 2020-08-20 2020-08-11 2020-09-10 2020-11-05 2020-10-24 2021-01-05 2020-11-14 2020-12-04 2021-01-01 2021-01-25 2021-05-25 Selection Implementation Detention Ponds, Mitigation Measures Reconstruction of 3 bridges and Repairs of the Odaw Drainage Channel GH-MWH-145708-CS-QCBS / Consultancy Service for Component 2: Solid Waste Quality And Cost- Design and construction IDA / V1450 Management Capacity Post Open - National 0.00 Canceled 2019-11-20 2020-01-06 2019-12-11 2020-01-24 2020-02-21 2020-03-22 2020-04-26 2020-05-31 2021-05-31 Based Selection supervision for Capping of Improvements Dumpsites. GH-MWH-204954-CS-CQS / Component 1: Climate Consultant Monthly Topographic and Under IDA / 64100 Resilient Drainage and Flood Post Qualification Open - National 0.00 2020-11-30 2020-12-08 2020-12-21 2020-12-28 2021-02-03 2021-03-05 2021-04-09 2022-01-13 Bathymetric Survey of the Implementation Mitigation Measures Selection Odaw River GH-MWH-96501-CS-QCBS / Consultancy Services for Component 1: Climate Supervision of Works for Quality And Cost- IDA / V1450 Resilient Drainage and Flood Prior Open - International 0.00 Canceled 2020-12-15 2021-01-05 2021-02-18 2021-03-18 2021-04-17 2021-05-22 2021-06-26 2022-06-26 Detention Ponds, Dredging Based Selection Mitigation Measures and urgent repairs of drainage network and bridges. GH-MWH-171486-CS-QCBS / Consultancy Services for Preparation of Environmental, Component 1: Climate Social Impact Assessment Quality And Cost- IDA / 64100 Resilient Drainage and Flood Post Open - National 0.00 Canceled 2020-06-05 2020-09-14 2020-06-26 2020-07-30 2020-08-27 2020-09-17 2020-10-15 2020-11-05 2021-03-05 (ESIA) for Proposed Handling Based Selection Mitigation Measures Site and disposal of dredge material- Agbobgloshie and Anyaa) GH-MWH-211351-CS-CQS / Consultancy Services for Component 1: Climate Consultant Preparation of Environmental, Under IDA / 64100 Resilient Drainage and Flood Post Qualification Open - National 0.00 2021-01-20 2021-01-19 2021-02-10 2021-03-11 2021-03-18 2021-04-08 2021-10-05 Social Impact Assessment Implementation Mitigation Measures Selection (ESIA) for Proposed disposal of dredge material at Anyaa GH-MWH-229995-CS-CQS / Consulting Services for the Consultant Preparation and Component 4: Project Pending IDA / 64100 Post Qualification Open - National 0.00 2021-04-30 2021-05-21 2021-07-04 2021-08-03 2021-09-07 2023-03-19 Implementation of Behaviour Management Implementation Selection Change Communication Strategy for GARID Project GH-MWH-207514-CS-CQS / Consultancy Services for Preparation of Environmental, Social Impact Assessment Component 1: Climate Consultant (ESIA) for removal, Pending IDA / 64100 Resilient Drainage and Flood Post Qualification Open - National 0.00 2021-05-10 2021-05-31 2021-07-14 2021-08-13 2021-09-17 2022-03-16 transportation and disposal of Implementation Mitigation Measures Selection legacy dredged materials at Korle Bu and Lavenda Hill to Final Disposal sites at Anyaa and Pokuase. INDIVIDUAL CONSULTANTS Page 5 Activity Reference No. / Invitation to Loan / Credit Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Contract Type Process Status Teams of Reference Identified/Selected Signed Contract Contract Completion No. (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GH-MWH-56604-CS-INDV / Component 1: Climate Individual Under Procurement of Project IDA / V1450 Resilient Drainage and Flood Prior Consultant Limited 0.00 2018-04-11 2018-04-13 2018-04-16 2018-04-11 2018-05-07 2018-05-08 2018-06-11 2018-12-08 Implementation Coordinator. Mitigation Measures Selection GH-MWH-59168-CS-INDV / Consultancy Service for Component 2: Solid Waste Individual environmental and social IDA / V1450 Management Capacity Prior Consultant Limited 0.00 Canceled 2018-04-16 2018-04-21 2018-04-27 2018-05-12 2018-11-08 impact assessment (ESIA) for Improvements Selection waste transfer station GH-MWH-60059-CS-CQS / Component 1: Climate Individual Procurement of an Under IDA / V1450 Resilient Drainage and Flood Prior Consultant Open 0.00 2018-05-21 2018-08-30 2018-07-09 2018-10-16 2018-07-30 2019-04-25 2018-08-27 2018-11-05 Environmentald Safeguard Implementation Mitigation Measures Selection specialist GH-MWH-60064-CS-CQS / Component 1: Climate Individual Under Procurement of Financial IDA / V1450 Resilient Drainage and Flood Prior Consultant Open 0.00 2018-05-21 2018-10-16 2018-07-09 2019-05-10 2018-07-30 2019-07-15 2018-08-27 2018-11-05 Implementation Management Specialist Mitigation Measures Selection GH-MWH-63174-CS-INDV / Component 1: Climate Individual Under Procurement of a Social IDA / V1450 Resilient Drainage and Flood Prior Consultant Open 0.00 2018-05-21 2018-08-30 2018-07-09 2018-09-18 2018-07-30 2019-05-29 2018-08-27 2018-11-05 Implementation Safeguard Specialist Mitigation Measures Selection GH-MWH-65243-CS-INDV / Consultancy Services for the Component 2: Solid Waste Individual Under Environmental and Social IDA / V1450 Management Capacity Prior Consultant Limited 0.00 2018-06-08 2018-06-11 2018-06-13 2018-06-18 2018-06-19 2018-06-23 2018-06-28 2018-09-06 Implementation Impact Assessment(ESIA) for Improvements Selection Waste Transfer Stations GH-MWH-60063-CS-CQS / Component 1: Climate Individual Under Procurement of a Procurement IDA / V1450 Resilient Drainage and Flood Prior Consultant Open 0.00 2018-05-21 2018-07-09 2018-07-30 2019-06-10 2018-08-27 2018-11-05 Implementation Specialist Mitigation Measures Selection Component 3: Participatory GH-MWH-67597-CS-CQS / Upgrading of Targeted Flood Individual Under Consultancy Service for IDA / V1450 Prone Low-income Post Consultant Open 0.00 2018-07-09 2018-10-16 2018-08-27 2018-09-03 2018-10-08 2019-04-06 Implementation Community Laison in Nima Communities and Local Selection Government Support Component 3: Participatory GH-MWH-67593-CS-CQS / Upgrading of Targeted Flood Individual Under Consultancy Services for IDA / V1450 Prone Low-income Post Consultant Open 0.00 2018-07-09 2018-10-16 2018-08-27 2018-09-03 2018-10-08 2019-04-06 Implementation Community Laison Alogboshie Communities and Local Selection Government Support Component 3: Participatory GH-MWH-67599-CS-CQS / Upgrading of Targeted Flood Individual Consultancy Services for Under IDA / V1450 Prone Low-income Post Consultant Open 0.00 2018-07-09 2018-10-16 2018-08-27 2018-09-03 2018-10-08 2019-04-06 Community Laison for Implementation Communities and Local Selection Akweteman Government Support GH-MWH-72548-CS-INDV / Component 2: Solid Waste Individual Consultancy Service for IDA / V1450 Management Capacity Post Consultant Open 0.00 Canceled 2018-08-02 2018-09-20 2018-10-11 2018-11-15 2019-05-14 Design and construction Improvements Selection supervision for Capping GH-MWH-80964-CS-INDV / Component 2: Solid Waste Individual Consultancy Services for Under IDA / V1450 Management Capacity Post Consultant Limited 0.00 2018-10-04 2018-10-09 2018-10-29 2018-10-16 2018-10-30 2019-04-28 Environmental Audit of Kpone Implementation Improvements Selection Landfill Site GH-MWH-81175-CS-INDV / Consultancy service for the Component 1: Climate Individual preparation of an Under IDA / V1450 Resilient Drainage and Flood Post Consultant Limited 0.00 2018-10-10 2018-10-16 2018-10-15 2018-10-29 2018-11-05 2018-12-10 2019-06-08 Environmental and Social Implementation Mitigation Measures Selection Impact Assessment on Dredging. GH-MWH-82203-CS-INDV / Consultancy Service for the Component 2: Solid Waste Individual Pending preparation of a Resettlement IDA / V1450 Management Capacity Post Consultant Open 0.00 2018-10-22 2018-12-10 2018-12-31 2019-02-04 2019-08-03 Implementation Action Plan for proposed Improvements Selection Capping of Dumpsite. Component 3: Participatory GH-MWH-67598-CS-CQS / Upgrading of Targeted Flood Individual Consultancy Services for IDA / V1450 Prone Low-income Post Consultant Open 0.00 Canceled 2018-07-09 2018-10-16 2018-08-27 2018-09-03 2018-10-08 2019-04-06 Community Laison for Alajo Communities and Local Selection Government Support GH-MWH-96520-CS-INDV / Consultancy services for Component 1: Climate Individual preparation of concept of IDA / V1450 Resilient Drainage and Flood Post Consultant Open 0.00 Canceled 2019-03-20 2019-05-08 2019-05-29 2019-07-03 2019-12-30 operations (CONOPS) to Mitigation Measures Selection support Hydrological services department(HSD) GH-MWH-103657-CS-INDV / Component 1: Climate Individual Consultancy Services for IDA / V1450 Resilient Drainage and Flood Post Consultant Open 0.00 Canceled 2019-03-29 2019-05-17 2019-06-07 2019-07-12 2019-08-11 preparation of Operation Mitigation Measures Selection (CONOPS) to support NADMO. GH-MWH-96514-CS-INDV / Consultancy service for Component 1: Climate Individual preparation of concept of IDA / V1450 Resilient Drainage and Flood Post Consultant Open 0.00 Canceled 2019-03-20 2019-05-08 2019-05-29 2019-07-03 2019-12-30 operations (CONOPS) to Mitigation Measures Selection support Ghana Meteorological Agency(G-Met) GH-MWH-145632-CS-INDV / Individual Component 4: Project Procurement of a IDA / V1450 Post Consultant Open 84,000.00 Signed 2019-11-24 2019-12-16 2020-01-12 2020-04-23 2020-02-02 2020-05-06 2020-03-08 2020-06-19 2022-02-28 Management Communication Specialist Selection GH-MWH-56614-CS-INDV / Individual Component 4: Project Procurement of a Monitoring IDA / V1450 Post Consultant Open 84,000.00 Signed 2019-11-24 2020-01-06 2020-01-12 2020-04-23 2020-02-02 2020-06-10 2020-03-08 2020-06-19 2022-02-28 Management and Evaluation Specialist Selection Page 6 Component 3: Participatory GH-MWH-147718-CS-INDV / Upgrading of Targeted Flood Individual Procurement of a Slum IDA / V1450 Prone Low-income Prior Consultant Open 115,200.00 Signed 2019-12-13 2020-03-08 2020-01-31 2020-09-11 2020-02-21 2020-10-12 2020-03-27 2020-10-27 2022-03-17 Upgrading and Community Communities and Local Selection Development Specialist Government Support GH-MWH-147973-CS-INDV / Consulting Services to Component 3: Participatory conduct Feasibility Studies of Upgrading of Targeted Flood Individual the Joint Development IDA / V1450 Prone Low-income Post Consultant Open 0.00 Canceled 2019-12-30 2020-02-17 2020-03-09 2020-04-13 2022-04-03 Planning Area and Communities and Local Selection Operationalisation of the Inter- Government Support Jurisdictional Coordination Management Framework. GH-MWH-171381-CS-CDS / Component 1: Climate Monthly Topographic and IDA / 64100 Resilient Drainage and Flood Prior Direct Selection Direct 0.00 Canceled 2020-05-11 2020-07-13 2020-05-21 2020-07-25 2021-04-21 Bathymetric Survey of the Mitigation Measures Odaw River GH-MWH-147708-CS-INDV / Component 1: Climate Individual Procurement of a Drainage IDA / V1450 Resilient Drainage and Flood Prior Consultant Open 0.00 Canceled 2019-12-12 2019-12-18 2020-01-30 2020-02-20 2020-03-26 2022-03-16 Specialist Mitigation Measures Selection GH-MWH-181685-CS-INDV / Individual Component 4: Project Procurement of a Drainage IDA / 64100 Prior Consultant Open 91,200.00 Signed 2020-07-06 2020-06-30 2020-08-24 2020-09-11 2020-09-14 2020-10-12 2020-10-19 2020-10-27 2022-10-19 Management Specialist Selection GH-MWH-147713-CS-INDV / Component 2: Solid Waste Individual Procurement of a Solid Waste IDA / V1450 Management Capacity Prior Consultant Open 0.00 Canceled 2019-12-13 2019-12-18 2020-01-31 2020-02-21 2020-03-27 2022-03-17 Management Specialist Improvements Selection GH-MWH-181875-CS-INDV / Individual Component 4: Project Procurement of a Solid Waste IDA / 64100 Prior Consultant Open 102,634.68 Signed 2020-07-07 2020-06-30 2020-08-25 2020-12-18 2020-09-15 2021-01-18 2020-10-20 2021-02-11 2022-10-20 Management Management Specialist Selection GH-MWH-148849-CS-CDS / Consulting Services for the Component 2: Solid Waste Preparation of Environmental, IDA / V1450 Management Capacity Prior Direct Selection Direct 0.00 Canceled 2020-08-28 2020-09-07 2020-11-11 2021-01-10 Social Impact Assessment Improvements (ESIA) for a Landfill site at Ayidan GH-MWH-223741-CS-INDV / Individual Component 4: Project Pending Selection of a Procurement IDA / 64100 Post Consultant Open 0.00 2021-04-30 2021-06-18 2021-07-09 2021-08-13 2023-08-03 Management Implementation Officer for GARID Project Selection GH-MWH-224551-CS-INDV / Selection of a Probity Component 1: Climate Individual Pending Assurance Provider for IDA / 64100 Resilient Drainage and Flood Prior Consultant Open 0.00 2021-05-05 2021-06-23 2021-07-14 2021-08-18 2021-11-16 Implementation Performance Based Contract Mitigation Measures Selection for Odaw Dredging Works Page 7