Procurement Plan Urban Development Project July 9, 2010 PROCUREMENT Kyrgyz Republic : Urban Development Project PLAN General Information Country: Kyrgyz Republic Bank’s Approval Date of the Original Procurement Plan: 2017-02-23 2020-12-25 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151416 GPN Date: Project Name: Urban Development Project Loan / Credit No: TF / 19293, IDA / 57620, IDA / D1010, TF / A1993 Community Development and Investment Agency Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned IDA-UDP-CW-2017-3 / Component A: Urban Single Stage - One 2018-02- Improvement of street IDA / 57620 Post Request for Bids Open - National 150,000.00 144,840.63 Signed 2017-05-21 2017-05-19 2017-05-26 2017-07-07 2017-06-19 2017-07-27 2017-07-14 2017-08-31 2017-09-04 Development Envelope 27 lightning in Toktogul/ IDA-UDP-CW-17-1 / "Rehabilitation of water supply Component A: Urban Single Stage - One 3,321,894.4 2018-08- IDA / 57620 Post Request for Bids Open - National 3,800,000.00 Signed 2017-10-17 2017-10-20 2017-10-22 2017-12-03 2017-11-21 2018-01-02 2018-03-27 2018-02-06 2018-04-20 system in Kerben city, Djalal- Development Envelope 5 05 Abad oblast" (2 lots). IDA-UDP-CW-2017-4 / Component A: Urban Request for Single Stage - One 2019-01- Improvement of street IDA / 57620 Post Open - National 190,000.00 0.00 Canceled 2018-02-06 2018-02-11 2018-03-24 2018-04-23 2018-05-28 Development Proposals Envelope 10 lightning in Balykchy IDA-UDP-CW-2018-5 / Construction works of Component A: Urban Single Stage - One 2019-02- IDA / 57620 Post Request for Bids Open - National 959,126.00 849,451.05 Signed 2018-04-29 2018-05-04 2018-05-04 2018-06-15 2018-06-25 2018-07-15 2018-09-11 2018-08-19 2018-10-19 Aytmatov school, Balykchy Development Envelope 15 city. IDA-UDP-CW-2018-6 / Component A: Urban Single Stage - One 2019-02- Construction works of IDA / 57620 Post Request for Bids Open - National 856,014.00 884,766.49 Signed 2018-04-29 2018-05-04 2018-05-04 2018-06-15 2018-06-25 2018-07-15 2018-09-04 2018-08-19 2018-10-19 Development Envelope 15 Toktogul school, Toktogul city IDA-UDP-CW-2018-2 / Rehabilitation of water supply Component A: Urban Single Stage - One 3,194,335.0 2019-11- IDA / 57620 Post Request for Bids Open - National 4,250,000.00 Signed 2018-04-25 2018-05-16 2018-05-04 2018-06-15 2018-06-11 2018-07-15 2018-07-12 2018-08-19 2018-09-01 system in Sulyukta city Batken Development Envelope 4 30 oblast (5 Lots) IDA-UDP-CW-2018-7 / Construction works of Jakypov Component A: Urban Single Stage - One 2019-05- school and Ak-Tilek TF / A1993 Post Request for Bids Open - National 823,834.00 740,789.72 Signed 2018-08-10 2018-07-27 2018-08-15 2018-09-26 2018-09-04 2018-10-26 2018-10-26 2018-11-30 2018-12-21 Development Envelope 29 kindergarten, Balykchy city (2 Lots) IDA-UDP-CW-2018-8 / Construction works of Component A: Urban Single Stage - One 1,154,757.6 2019-05- Bokonbaev school and Archa- TF / A1993 Post Request for Bids Open - National 1,314,328.00 Signed 2018-08-10 2018-07-27 2018-08-15 2018-09-26 2018-09-04 2018-10-26 2018-10-19 2018-11-30 2018-12-21 Development Envelope 5 29 Beshik kindergarten, Toktogul city (2 Lots) IDA-UDP-CW-2021-1 / Pending Component A: Urban 2021-08- Rehabilitation of water supply IDA / 57620 Prior Direct Selection Direct 329,000.00 0.00 Implementat 2020-12-28 2021-01-02 2021-02-06 Development 05 system in Sulyukta (Phase 2) ion IDA-UDP-CW-2021-2 / Pending Component A: Urban 2021-08- Rehabilitation of water supply IDA / 57620 Prior Direct Selection Direct 255,495.00 0.00 Implementat 2020-12-28 2021-01-02 2021-02-06 Development 05 system in Sulyukta (Phase 2) ion GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ARIS-UDP-G-18-1 / Purchase of special machinery (back loading waste Component A: Urban Single Stage - One TF / A1993 Post Request for Bids Open - National 150,000.00 131,057.90 Completed 2018-08-10 2018-08-10 2018-08-17 2018-09-28 2018-09-07 2018-10-28 2018-12-02 2018-10-23 2019-05-31 2019-01-31 machinery) for Toktogul, Development Envelope Kerben, Balykchy and Sulyukta towns IDA-UDP-G-2020-1 / Under Purchase of computer Component A: Urban Request for Single Stage - One IDA / D1010 Post Open - National 5,500.00 0.00 Implementati 2020-12-19 2020-12-16 2021-02-13 2021-08-12 equipment for billing systems Development Quotations Envelope on for municipalities ( Sulukta) IDA-UDP-G-2020-2 / Purchase of furniture Under Component A: Urban Request for Single Stage - One equipment for input of billing IDA / D1010 Post Open - National 1,500.00 0.00 Implementati 2020-12-19 2020-12-16 2021-02-13 2021-08-12 Development Quotations Envelope systems for municipalities on (Sulyukta) IDA-UDP-NCB-GOODS-2020- Under 6 / Purchase of special Component A: Urban Single Stage - One IDA / D1010 Post Request for Bids Open - National 250,000.00 0.00 Implementati 2020-12-14 2020-12-18 2020-12-19 2020-12-21 2021-01-30 2021-03-01 2021-04-05 2021-10-02 equipment for cities Sulukta, Development Envelope on Kerben, Balykchy,Toktogul IDA-UDP-NCB-GOODS-2020- Under 4 / Purchase of furniture for Component A: Urban Single Stage - One IDA / D1010 Post Request for Bids Open - National 210,000.00 0.00 Implementati 2020-12-14 2020-12-18 2020-12-19 2020-12-21 2021-01-30 2021-03-01 2021-04-05 2021-10-02 schools and kindergarten in Development Envelope on the city Balykchy,Toktogul IDA-UDP-GOODS-2020-5 / Purchase of equipment and Under Component A: Urban Request for Single Stage - One inventory for schools and IDA / D1010 Post Open - National 20,000.00 0.00 Implementati 2020-12-19 2020-12-16 2021-02-13 2021-08-12 Development Quotations Envelope kindergartens in the city on Toktogul, Balykchy NON CONSULTING SERVICES Page 1 Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UDP PPG-FBS-2015-3 / Preparation of Feasibility Component A: Urban Fixed Budget Studies and Detailed Designs TF / 19293 Prior Open - International 0.00 346,000.00 Signed 2015-12-22 2016-01-02 Development Selection of water supply systems in Sulukta and Kerben UDP PPG-QCBS-2016-4 / Preparation of Feasibility Studies and Designs for Improved Seismic Safety and Component A: Urban Quality And Cost- IDA / 57620 Prior Open - International 0.00 647,522.22 Signed 2016-11-10 2016-11-15 Energy Efficiency of Schools Development Based Selection and Kindergartens and Technical Supervision of construction. ARIS-AUDIT-LCS-2017-1 / Component C: Least Cost IDA / 57620 Post Open - International 60,000.00 71,433.00 Signed 2017-10-17 2017-10-09 2017-11-07 2018-03-12 2017-12-21 2018-03-28 2018-01-18 2018-04-18 2018-02-17 2018-04-18 2018-03-24 2018-04-23 2018-04-28 2018-04-26 2018-10-25 Audit of project funds Implementation Support Selection IDA-UDP-CS-CQS-2018-1 / Consultant Component A: Urban Contract supervision for IDA / 57620 Post Qualification Open - National 150,000.00 168,921.90 Signed 2018-10-03 2018-10-31 2018-10-24 2018-11-02 2018-12-07 2018-12-03 2019-01-06 2018-12-14 2019-02-10 2018-12-14 2019-08-09 Development schools local company Selection IDA-UDP-CQS-2018-2 / Consultants services to carry out hydrogeological studies of Consultant Component A: Urban springs pinching out on the IDA / 57620 Post Qualification Open - National 20,000.00 0.00 Canceled 2019-03-05 2019-03-14 2019-03-26 2019-03-19 2019-05-09 2019-06-08 2019-07-13 2020-01-09 Development left bank of the Padysha-Ata Selection river in Kerben town, Jalal- Abad oblast Consultant IDA-UDP-CQ-2019-3 / Component A: Urban IDA / 57620 Post Qualification Open - National 35,000.00 0.00 Canceled 2020-01-30 2020-02-20 2020-04-04 2020-05-04 2020-06-08 2020-12-05 Impact Assesment Development Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UDP-ECAPDEV-CS-2015-1 / Consultancy Services for the Results Assessment of the Component A: Urban Urban Development Project TF / 19293 Prior Direct Selection Direct 0.00 43,758.68 Signed 2015-07-01 Development (UDP) and Bishkek and Osh Urban Infrastructure Project (BOUIP) IDA-UDP-CS-IC-17-1 / Component A: Urban Consulatnt for development of IDA / 57620 Post Direct Selection Direct 3,000.00 3,936.30 Completed 2017-05-14 2018-05-18 2017-05-24 2017-05-12 2017-07-28 2017-05-15 2018-01-24 2017-08-31 Development streetlightning design Individual IDA-UDP-CS-IC-2017-2 / Component A: Urban IDA / D1010 Post Consultant Open 18,530.00 5,947.69 Signed 2017-05-28 2018-05-17 2017-07-16 2018-04-10 2017-08-06 2018-04-10 2017-09-10 2018-04-23 2018-03-09 Resident engineer in Kerben Development Selection Individual IDA-UDP-CS-IC-2017-3 / Component A: Urban IDA / 57620 Post Consultant Open 18,530.00 3,018.73 Signed 2017-05-28 2018-05-17 2017-07-16 2018-09-05 2017-08-06 2018-09-05 2017-09-10 2018-09-13 2018-03-09 Resident engineer in Sulyukta Development Selection IDA-UDP-CS-IC-2017-4 / Individual Component A: Urban Assistant resident engineer in IDA / D1010 Post Consultant Open 8,824.00 4,758.15 Signed 2017-05-28 2018-05-18 2017-07-16 2018-04-10 2017-08-06 2018-04-10 2017-09-10 2018-04-23 2018-03-09 Development Kerben Selection IDA-UDP-CS-IC-2017-5 / Individual Component A: Urban Assistant resident engineers IDA / D1010 Post Consultant Open 8,824.00 2,082.41 Signed 2017-05-28 2018-05-18 2017-07-16 2018-09-05 2017-08-06 2018-09-05 2017-09-10 2018-09-13 2018-03-09 Development in Sulyukta Selection Individual IDA-UDP-IC-2018-2 / Social Component B: Institutional IDA / 57620 Post Consultant Open 11,118.00 5,146.54 Signed 2018-06-29 2018-06-01 2018-11-18 2018-04-10 2018-12-09 2018-04-10 2019-01-13 2018-04-16 2019-07-12 mobilizers Strengthening Selection Individual IDA-UDP-IC-2018-3 / Social Component B: Institutional IDA / 57620 Post Consultant Open 11,118.00 2,185.97 Signed 2018-07-01 2018-05-16 2018-08-19 2018-09-05 2018-09-09 2018-09-12 2018-10-14 2018-09-13 2019-04-12 mobilizers Strengthening Selection IDA-UDP-IC-2018-11 / Individual Component C: Strengthening of technical IDA / 57620 Post Consultant Open 100,000.00 104,946.40 Terminated 2018-02-06 2018-01-17 2018-03-27 2018-04-18 2018-04-17 2018-04-16 2018-05-22 2018-04-30 2018-11-18 Implementation Support supervision Selection IDA-UDP-SSS-17-4 / Component A: Urban Consulatnt for author IDA / 57620 Post Direct Selection Direct 1,500.00 1,371.78 Completed 2017-09-06 2017-09-07 2017-09-27 2017-09-21 2017-09-28 2017-09-28 2018-03-30 2018-03-03 Development supervision Toktogul IDA-UDP-SSS-18-1 / Component A: Urban Consulatnt for author IDA / 57620 Post Direct Selection Direct 1,500.00 1,371.78 Completed 2017-09-06 2018-05-18 2017-09-26 2018-04-02 2018-02-28 2018-04-02 2018-09-30 2018-09-30 Development supervision Balykchy IDA-UDP-IC-18-18 / Individual Consultant on improving the Component B: Institutional IDA / 57620 Post Consultant Open 40,000.00 48,310.29 Terminated 2018-04-04 2018-06-01 2018-06-29 2018-07-09 2018-07-20 2018-07-20 2018-08-24 2018-08-01 2019-02-20 activity of the water utilities of Strengthening Selection Kerben, Sulukta Page 2 IDA-UDP-IC-18-17 / Local Individual consultant on improving the Component B: Institutional IDA / 57620 Post Consultant Open 11,600.00 6,955.62 Completed 2018-04-04 2018-06-01 2018-05-23 2018-08-10 2018-06-13 2018-08-27 2018-07-18 2018-09-04 2019-01-14 2019-11-30 activity of the water utilities of Strengthening Selection Kerben, Sulukta IDA-UDP-IC-2017-1 / Individual Contract supervision for Component B: Institutional IDA / 57620 Post Consultant Open 6,500.00 1,575.93 Completed 2017-06-15 2017-10-01 2017-08-26 2017-10-10 2017-09-16 2017-10-10 2017-11-01 2017-11-01 2018-03-31 2018-03-30 lightning/Electrical engineer Strengthening Selection in Toktogul city IDA-UDP-IC-2018-17 / Individual Consultant for author Component A: Urban TF / A1993 Post Consultant Limited 7,500.00 12,987.62 Signed 2018-05-31 2018-05-24 2018-06-05 2018-06-20 2018-06-26 2018-06-20 2018-07-31 2018-06-20 2019-10-31 supervision in Kerben city Development Selection Djalal-Abad oblast IDA-UDP-IC-2018-18 / Individual Consultant for author Component A: Urban TF / A1993 Post Consultant Limited 7,500.00 12,627.73 Signed 2018-05-31 2018-05-24 2018-06-05 2018-06-20 2018-06-26 2018-06-20 2018-08-01 2018-06-20 2020-01-31 supervision in Sulyukta city Development Selection Batken oblast IDA-UDP-IC-2018-1 / Individual Contract supervision for Component B: Institutional IDA / 57620 Post Consultant Open 6,500.00 6,911.70 Completed 2018-05-18 2018-03-01 2018-07-06 2018-03-30 2018-07-27 2018-03-30 2018-08-31 2018-04-02 2019-02-27 2018-12-31 lightning/Electrical engineer Strengthening Selection in Balykchy city IDA-UDP-IC-2018-25 / Individual Component A: Urban International consultant for IDA / 57620 Post Consultant Open 50,000.00 21,035.00 Signed 2018-10-03 2018-10-30 2018-11-21 2018-11-16 2018-12-12 2018-12-24 2019-01-16 2018-12-28 2019-07-15 Development seismic Selection IDA-UDP-IC-2018-26 / Individual Component A: Urban international consultant on IDA / 57620 Post Consultant Open 50,000.00 32,571.00 Signed 2018-10-03 2018-10-30 2018-11-21 2018-11-16 2018-12-12 2018-12-27 2019-01-16 2018-12-28 2019-07-15 Development energy efficiency Selection IDA-UDP-CS-DS-2018-1 / Component A: Urban Local consulatnt for author IDA / 57620 Post Direct Selection Direct 61,500.00 87,093.37 Signed 2018-10-03 2018-12-06 2018-10-13 2018-10-25 2018-12-17 2018-12-17 2019-06-15 Development supervision for school IDA-UDP-IC-2018-21 / Individual Component B: Institutional Consultant on legal zoning IDA / 57620 Post Consultant Open 10,230.00 0.00 Canceled 2018-10-05 2018-11-29 2018-11-23 2018-12-14 2019-01-18 2019-07-17 Strengthening and land use. (Consultant#3) Selection IDA-UDP-IC-2018-22 / Consultant on planning socio- economic development, local Individual Component B: Institutional governance and citizen IDA / 57620 Post Consultant Open 15,750.00 0.00 Canceled 2018-10-05 2018-12-19 2018-11-23 2018-12-14 2019-01-18 2019-07-17 Strengthening participation in the decision- Selection making process (Consultant#1 Team Leader) IDA-UDP-IC-2018-23 / Individual Component B: Institutional Consultant on spatial IDA / 57620 Post Consultant Open 15,000.00 0.00 Canceled 2018-10-05 2018-11-29 2018-11-23 2018-12-14 2019-01-18 2019-07-17 Strengthening planning. (Consultant #2) Selection IDA-UDP-IC-2018-28 / Local Individual Component A: Urban consultant to adapt the IDA / 57620 Post Consultant Open 8,000.00 3,582.18 Completed 2018-11-30 2018-12-04 2019-01-18 2019-02-11 2019-02-08 2019-02-11 2019-03-15 2019-02-12 2019-09-11 2020-07-31 Development Manual Selection IDA-UDP-IC-2018-29 / Individual International consultant on Component A: Urban IDA / 57620 Post Consultant Open 60,000.00 26,468.00 Signed 2018-12-07 2018-12-10 2019-01-25 2019-01-30 2019-02-15 2019-02-11 2019-03-22 2019-02-12 2020-03-21 Strengthening of techncial Development Selection supervision IDA-UDP-CS-DS-2018-2 / International consultant - advisor on construction Component A: Urban IDA / 57620 Post Direct Selection Direct 15,000.00 0.00 Canceled 2018-10-05 2018-10-15 2018-12-19 2019-06-17 technical supervision of water Development supply projects in Kerben and Sulyukta towns IDA-UDP-IC-2018-31 / Individual Technical support consultant Component B: Institutional IDA / 57620 Post Consultant Open 15,000.00 24,550.00 Signed 2018-12-25 2018-12-19 2019-02-12 2019-02-07 2019-03-05 2019-02-11 2019-04-09 2019-02-12 2019-10-06 of the UDP on water supply Strengthening Selection projects IDA-UDP-IC-2018-32 / Individual Consultant on improving the Component A: Urban IDA / 57620 Post Consultant Open 50,000.00 36,457.00 Completed 2018-12-20 2018-12-19 2019-02-07 2018-12-04 2019-02-28 2018-12-27 2019-04-04 2018-12-28 2019-10-01 2019-11-30 activity of the water utilities of Development Selection Kerben, Sulukta IDA-UDP-IC-2018-27 / Individual Component A: Urban Consultant on legal issues IDA / 57620 Post Consultant Open 7,500.00 0.00 Canceled 2018-11-12 2018-11-29 2018-12-31 2019-01-21 2019-02-25 2019-08-24 Development (Consultant#4) Selection Individual IDA-UDP-IC-2018-33 / Component A: Urban IDA / 57620 Post Consultant Open 13,500.00 0.00 Canceled 2018-12-20 2018-12-27 2019-02-07 2019-02-28 2019-04-04 2019-10-01 lawyer (Consultant#4) Development Selection IDA-UDP-IC-2019-22 / Consultant on planning socio- economic development, local Component B: Institutional governance and citizen IDA / 57620 Post Direct Selection Direct 15,750.00 12,074.00 Completed 2019-03-05 2019-03-18 2019-03-15 2019-03-20 2019-05-19 2019-04-01 2019-11-15 2019-12-25 Strengthening participation in the decision- making process (Consultant#1 Team Leader) IDA-UDP-IC-2019-23 / Component B: Institutional Consultant on spatial IDA / 57620 Post Direct Selection Direct 15,000.00 11,146.29 Completed 2019-03-05 2019-03-18 2019-03-15 2019-03-20 2019-05-19 2019-03-25 2019-11-15 2019-12-25 Strengthening planning. (Consultant #2) IDA-UDP-IC-2019-21 / Component B: Institutional Consultant on legal zoning IDA / 57620 Post Direct Selection Direct 10,230.00 8,917.03 Completed 2019-03-05 2019-03-18 2019-03-15 2019-03-20 2019-05-19 2019-03-29 2019-11-15 2019-12-25 Strengthening and land use. (Consultant#3) IDA-UDP-IC-2019-33 / Component B: Institutional IDA / 57620 Post Direct Selection Direct 13,500.00 12,074.00 Completed 2019-03-05 2019-03-18 2019-03-15 2019-03-20 2019-05-19 2019-04-01 2019-11-15 2019-12-25 lawyer (Consultant#4) Strengthening IDA-UDP-IC-2019-35 / Individual Component B: Institutional Institutional Development IDA / 57620 Post Consultant Open 17,000.00 28,627.81 Signed 2019-05-06 2019-05-08 2019-06-24 2019-06-21 2019-07-15 2019-06-24 2019-08-19 2019-07-01 2020-02-15 Strengthening Specialist Selection Page 3 Individual IDA-UDP-IC-2019-37 / Component A: Urban IDA / 57620 Post Consultant Limited 3,750.00 4,350.45 Signed 2019-07-12 2019-08-01 2019-07-17 2019-09-02 2019-08-07 2019-09-05 2019-09-11 2019-09-09 2020-03-09 Hydrogeologist Development Selection IDA-UDP-IC-2019-39 / Individual Component A: Urban Electrical and mechanical IDA / 57620 Post Consultant Limited 7,500.00 4,372.19 Completed 2019-07-12 2019-08-01 2019-07-17 2019-09-02 2019-08-07 2019-09-05 2019-09-11 2019-09-05 2020-03-09 2020-08-31 Development engineer Selection IDA-UDP-SSS-19-1 / Consulting services for Component A: Urban amending previously IDA / 57620 Post Direct Selection Direct 10,000.00 10,384.65 Signed 2019-10-31 2020-02-27 2019-11-10 2019-11-04 2020-01-14 2019-11-13 2020-07-12 Development developed Design and Estimate Documentation Individual IDA-UDP-IC-2020-1 / Civil Component B: Institutional IDA / 57620 Post Consultant Limited 2,700.00 13,162.64 Signed 2020-02-04 2020-02-03 2020-02-09 2020-01-31 2020-03-01 2020-02-04 2020-04-05 2020-02-04 2020-10-02 Engineer Strengthening Selection Individual IDA-UDP-IC-2019-38 / Component A: Urban IDA / 57620 Post Consultant Limited 3,750.00 0.00 Canceled 2019-07-12 2019-07-17 2019-08-07 2019-09-11 2020-03-09 Quality control Engineer Development Selection IDA-UDP-SSS-2020-3 / Component C: Pending IDA / D1010 Post Direct Selection Direct 18,000.00 0.00 2020-12-28 2021-01-07 2021-03-13 2021-09-09 Impact Assesment Implementation Support Implementation Page 4