PE Cusco Regional Development (P117318) Procurement Plan Country: Peru Region: LATIN AMERICA AND CARIBBEAN Approval Date: 22-Nov-2013 General Procurement Notice published on: 30-Sept-2014 July 9, 2010 PROCUREMENT Peru : Cusco Regional Development PLAN General Information Country: Peru Banks Approval Date of the Original Procurement Plan: 2017-09-21 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-11-21 Project ID: P117318 GPN Date: Project Name: Cusco Regional Development Loan / Credit No: IBRD / 83060 Executing Agency(ies): Proyecto Especial Regional Plan COPESCO WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-COPESCO-35835-CW-RFB / Ejecucion de Obra de Integrated Solid Waste Single Stage - One Pending Infraestructura para la IBRD / 83060 Post Request for Bids Open - National 3,287,423.00 0.00 2017-11-20 2017-11-25 2018-01-06 2018-02-05 2018-03-12 2018-11-20 Management Envelope Implementation disposicion final de RR.SS. de las provincias de Calca PE-COPESCO-35848-CW-RFB / Ejecucion de Obra de Servicio Development and Consolidation Single Stage - One Pending Turistico de Observacion Integral IBRD / 83060 Post Request for Bids Open - National 817,311.00 0.00 2017-12-11 2017-12-16 2018-01-27 2018-02-26 2018-04-02 2018-07-04 of Tourism Services Envelope Implementation del Paisaje Integral Cusco- Circuito Valle Sagrado. PE-COPESCO-35849-CW-RFB / Ejecución de Obras de Mejoramiento de Vía - servicios Development and Consolidation Single Stage - One Pending IBRD / 83060 Prior Request for Bids Open - National 7,733,306.00 0.00 2018-01-15 2018-01-20 2018-03-03 2018-04-02 2018-05-07 2018-12-11 turísticos públicos en el recorrido of Tourism Services Envelope Implementation del atractivo Arqueológico de PISAQ PE-COPESCO-35828-CW-RFB / Ejecucion de Obra - Proyecto Monumento Arqueológico de Development and Consolidation Single Stage - One Pending Ollantaytambo - Componente IBRD / 83060 Post Request for Bids Open - National 601,747.00 0.00 2017-12-11 2017-12-16 2018-01-27 2018-02-26 2018-04-02 2018-07-04 of Tourism Services Envelope Implementation Acondicionamiento (Inc. Implementación del plan de mitigación de impacto ambiental) PE-COPESCO-35829-CW-RFB / Ejecucion de Obra de Integrated Solid Waste Single Stage - One Pending Infraestructura para la IBRD / 83060 Post Request for Bids Open - National 4,001,188.00 0.00 2016-09-28 2016-10-03 2016-11-14 2016-12-14 2017-01-18 2018-05-26 Management Envelope Implementation disposicion final de RR.SS. de las provincias de Urubamba. PE-COPESCO-36033-CW-RFB / Ejecución de Obra - Proyecto monumento arqueológico de Development and Consolidation Single Stage - One Pending Ollantaytambo - Componente IBRD / 83060 Post Request for Bids Open - National 946,817.00 0.00 2017-12-11 2017-12-16 2018-01-27 2018-02-26 2018-04-02 2018-07-04 of Tourism Services Envelope Implementation Acondicionamiento (Inc. Implementación del Plan de mitigación de Impacto Ambiental) PE-COPESCO-36035-CW-RFB / Ejecución de Obra de Development and Consolidation Single Stage - One Pending acondicionamiento y IBRD / 83060 Post Request for Bids Open - National 4,639,389.00 0.00 2018-05-15 2018-05-20 2018-07-01 2018-07-31 2018-09-04 2018-12-06 of Tourism Services Envelope Implementation restauración Turístico P.A. de Pisaq GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-COPESCO-35871-GO-RFQ / Integrated Solid Waste Request for Single Stage - One Pending IBRD / 83060 Post Open - National 33,793.00 0.00 2018-05-06 2018-07-01 2018-12-22 Agroforestería (Calca) Management Quotations Envelope Implementation PE-COPESCO-35961-GO-RFQ / Integrated Solid Waste Request for Single Stage - One Pending IBRD / 83060 Post Open - National 22,528.00 0.00 2018-03-06 2018-05-01 2018-10-22 Agroforestería (Urubamba) Management Quotations Envelope Implementation PE-COPESCO-35872-GO-RFQ / Adquisición de vehículos menores para la ampliación y Integrated Solid Waste Request for Single Stage - One Pending IBRD / 83060 Post Open - National 48,982.00 0.00 2018-02-09 2018-04-06 2018-05-21 mejoramiento del Sist. Gestión Management Quotations Envelope Implementation Integral de RR.SS. Calca y RR.SS. Urubamba PE-COPESCO-35861-GO-RFQ / Institutional Strengthening, Request for Single Stage - One Pending Adquisición de Equipos de IBRD / 83060 Management and Monitoring and Post Open - National 32,225.00 0.00 2016-02-25 2016-04-21 2016-06-30 Quotations Envelope Implementation informatica e impresiones Evaluation PE-COPESCO-35964-GO-RFQ / Institutional Strengthening, Request for Single Stage - One Pending Adquisición de Equipos de IBRD / 83060 Management and Monitoring and Post Open - National 40,436.00 0.00 2016-02-22 2016-04-18 2016-10-15 Quotations Envelope Implementation Oficina (Mobiliario PRODER) Evaluation NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-COPESCO-35874-NC-RFB / Realización de Talleres de Development and Consolidation Single Stage - One Pending Capacitación y Sensibilización a IBRD / 83060 Post Request for Bids Open - National 64,308.00 0.00 2018-01-16 2018-01-21 2018-03-04 2018-04-03 2018-05-08 2018-12-31 of Tourism Services Envelope Implementation población de Pisaq, Valle Sagrado y Ollantaytambo PE-COPESCO-35876-NC-RFB / Integrated Solid Waste Single Stage - One Pending Producción y comercialización IBRD / 83060 Post Request for Bids Open - National 83,764.00 0.00 2017-12-15 2017-12-20 2018-01-31 2018-03-02 2018-04-06 2018-12-31 Management Envelope Implementation de Tara (Urubamba) Page 1 PE-COPESCO-35915-NC-RFQ / Contratación de una empresa Development and Consolidation Request for Single Stage - One Pending para la realización de acciones IBRD / 83060 Post Open - National 17,648.00 0.00 2018-01-21 2018-03-18 2018-12-31 of Tourism Services Quotations Envelope Implementation de sostenibilidad del proyecto PISAQ, Cusco y Ollantaytambo PE-COPESCO-35878-NC-RFQ / Edición, diagramación, publicación y difusión de una Disaster Risk Management and Request for Single Stage - One Pending IBRD / 83060 Post Open - National 15,000.00 0.00 2017-10-04 2017-11-29 2018-05-27 versión amigable del Plan de Disaster Preparedness Quotations Envelope Implementation Prevención y Reducción del Riesgo de Desastres Regional CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PE-COPESCO-35862-CS-QCBS / Elaboración de expediente de Disaster Risk Management and Quality And Cost- Pending adquisición de la implementación IBRD / 83060 Post Open - National 175,595.00 0.00 2017-05-13 2017-06-03 2017-07-17 2017-08-14 2017-09-13 2017-10-18 2017-11-22 2018-04-18 Disaster Preparedness Based Selection Implementation SAT Patacancha y SAT Kitamayu, incluye DIA PE-COPESCO-35883-CS-QCBS / Contratación de una empresa Integrated Solid Waste Quality And Cost- Pending para la implementación del plan IBRD / 83060 Post Open - National 244,182.00 0.00 2017-12-15 2018-01-05 2018-02-18 2018-03-18 2018-04-17 2018-05-22 2018-06-26 2018-12-30 Management Based Selection Implementation de segregadores para RR SS Cusco PE-COPESCO-35946-CS-CQS / Elaboración de expediente de Consultant ingeniería del Proyecto Development and Consolidation Pending IBRD / 83060 Post Qualification Open - National 98,377.00 0.00 2017-09-07 2017-09-28 2017-11-11 2017-12-11 2018-01-15 2018-04-15 Monumento Arqueológico de of Tourism Services Implementation Selection PISAQ- Componente Acondicionamiento PE-COPESCO-35906-CS-CQS / Estudio de Impacto ambiental del Consultant proyecto de Mejoramiento de Development and Consolidation Pending IBRD / 83060 Post Qualification Open - National 18,593.00 0.00 2016-08-23 2016-09-13 2016-10-27 2016-11-26 2016-12-31 2017-12-11 Servicios Turísticos de of Tourism Services Implementation Selection Observación de Paisaje integral de Cusco. PE-COPESCO-35884-CS-CQS / Elaboración de expediente de Consultant Development and Consolidation Pending ingeniería -Proyecto Monumento IBRD / 83060 Post Qualification Open - National 28,161.00 0.00 2016-08-23 2016-09-13 2016-10-27 2016-11-26 2016-12-31 2017-11-24 of Tourism Services Implementation Arqueológico de Ollantaytambo- Selection componente vial PE-COPESCO-35936-CS-CQS / Elaboración de expediente de Consultant Development and Consolidation Pending ingeniería -Proyecto Monumento IBRD / 83060 Post Qualification Open - National 19,500.00 0.00 2016-05-23 2016-06-13 2016-07-27 2016-08-26 2016-09-30 2017-11-24 of Tourism Services Implementation Arqueológico de Ollantaytambo- Selection componente acondicionamiento PE-COPESCO-35919-CS-CQS / Consultant Elaboración del Plan de Disaster Risk Management and Pending IBRD / 83060 Post Qualification Open - National 53,000.00 0.00 2018-02-04 2018-02-25 2018-04-10 2018-05-10 2018-06-14 2018-08-08 preparativos Gestión de Riesgos Disaster Preparedness Implementation Selection de Desastres PE-COPESCO-35963-CS-CQS / Elaboracion de Expediente Técnico de ingeniería de Consultant Development and Consolidation Pending Proyecto Mejoramiento de IBRD / 83060 Post Qualification Open - National 53,161.00 0.00 2016-05-23 2016-06-13 2016-07-27 2016-08-26 2016-09-30 2017-11-24 of Tourism Services Implementation Servicios turisticos de Selection Observación de Paisaje integral de Cusco PE-COPESCO-35940-CS-CQS / Consultant Contratación de un consultor Development and Consolidation Pending IBRD / 83060 Post Qualification Open - National 87,286.00 0.00 2017-12-15 2018-01-05 2018-02-18 2018-03-20 2018-04-24 2018-08-07 para Estudios de Capacidades of Tourism Services Implementation Selection de Carga de Recursos Turísticos PE-COPESCO-35920-CS-CQS / Estudio de Impacto ambiental del Consultant proyecto mejoramiento de los Development and Consolidation Pending IBRD / 83060 Post Qualification Open - National 20,000.00 0.00 2016-08-23 2016-09-13 2016-10-27 2016-11-26 2016-12-31 2017-12-11 servicios Turísticos de los of Tourism Services Implementation Selection Principales Atractivos arqueológicos de Ollantaytambo PE-COPESCO-35885-CS-CQS / Estudio de evaluación de Consultant Development and Consolidation Pending culminación de la IBRD / 83060 Post Qualification Open - National 96,060.00 0.00 2018-01-15 2018-02-05 2018-03-21 2018-04-20 2018-05-25 2018-07-12 of Tourism Services Implementation Implementación del Plan de Selection Competitividad PE-COPESCO-35827-CS-CQS / Actividades de Mejoramiento de Servicios Turísticos-Proyecto Consultant Development and Consolidation Pending atractivos arquelógicos Pisaq, IBRD / 83060 Post Qualification Open - National 42,439.00 0.00 2017-12-15 2018-01-05 2018-02-18 2018-03-20 2018-04-24 2018-09-21 of Tourism Services Implementation paisaje integral cusco y Selection atractivos Arqueológico de Ollantaytambo. PE-COPESCO-35858-CS-CQS / Elaboración de estudio definitivo Consultant Disaster Risk Management and Pending de adquisición de la IBRD / 83060 Post Qualification Open - National 99,342.00 0.00 2017-11-15 2017-12-06 2018-01-19 2018-02-18 2018-03-25 2018-08-07 Disaster Preparedness Implementation implementación del SAT Selection Vilcanota, incluye DIA PE-COPESCO-35859-CS-CQS / Elaboración de expediente Consultant técnico para la obra de Development and Consolidation Pending IBRD / 83060 Post Qualification Open - National 96,552.00 0.00 2017-11-15 2017-12-06 2018-01-19 2018-02-18 2018-03-25 2018-05-09 tratamiento integral de mitigación of Tourism Services Implementation Selection de riesgos en la cuenca del río Ccochoq Calca INDIVIDUAL CONSULTANTS Page 2 Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Development and Consolidation of Tourism Services Institutional Strengthening, 082-2016-CG-PRODER/CUSCO Management and Monitoring and / Contratacion al 2do lugar del Individual Consultant IBRD / 83060 Evaluation Prior Open N 0.00 9,427.81 Signed 2016-06-14 2016-06-27 proceso de evaluacion del Selection Disaster Risk Management and asistente de adquisiciones. Disaster Preparedness Integrated Solid Waste Management Development and Consolidation of Tourism Services Institutional Strengthening, 068-2016-CG-PRODER CUSCO Management and Monitoring and / Solicitud de no objection al Individual Consultant IBRD / 83060 Evaluation Prior Open N 0.00 3,032.92 Canceled 2016-06-09 proceso de evaluacion del Selection Disaster Risk Management and asistente de adquisiciones Disaster Preparedness Integrated Solid Waste Management PE-COPESCO-35935-CS-INDV Institutional Strengthening, / Contratación de un consultor Individual Consultant Pending IBRD / 83060 Management and Monitoring and Post Open 106,284.00 0.00 2015-11-27 2016-01-15 2016-02-05 2016-03-11 2018-12-31 Asistente de Salvaguardas Selection Implementation Evaluation Ambientales -Turismo PE-COPESCO-35937-CS-INDV Institutional Strengthening, / Contratación de consultor Individual Consultant Pending IBRD / 83060 Management and Monitoring and Post Open 106,284.00 0.00 2015-11-27 2016-01-15 2016-02-05 2016-03-11 2018-12-31 Asistentes de Salvaguardas Selection Implementation Evaluation Sociales - Turismo PE-COPESCO-35956-CS-INDV Institutional Strengthening, / Contratación de un Consultor Individual Consultant Pending IBRD / 83060 Management and Monitoring and Prior Open 128,125.00 0.00 2016-07-15 2016-09-02 2016-09-23 2016-10-28 2018-12-31 Coordinador de Salvaguardas Selection Implementation Evaluation Sociales PE-COPESCO-35921-CS-INDV Institutional Strengthening, Individual Consultant Pending / Contratación de un Consultor IBRD / 83060 Management and Monitoring and Prior Open 174,503.00 0.00 2017-10-01 2017-11-19 2017-12-10 2018-01-14 2018-12-31 Selection Implementation Coordinador Técnico TURISMO Evaluation PE-COPESCO-35922-CS-INDV Institutional Strengthening, Individual Consultant Pending / Contratación de un Consultor IBRD / 83060 Management and Monitoring and Prior Open 91,669.00 0.00 2016-11-01 2016-12-20 2017-01-10 2017-02-14 2018-12-31 Selection Implementation Especialista de Infraestructura Evaluation PE-COPESCO-35908-CS-INDV Institutional Strengthening, Individual Consultant Pending / Contratación de un Consultor IBRD / 83060 Management and Monitoring and Prior Open 143,778.00 0.00 2017-10-01 2017-11-19 2017-12-10 2018-01-14 2018-12-31 Selection Implementation Oficial de Gestión Social Evaluation PE-COPESCO-35914-CS-INDV / Asesor técnico para la Integrated Solid Waste Individual Consultant Pending IBRD / 83060 Post Direct 10,248.00 0.00 2016-08-22 2016-09-01 2016-09-22 2016-10-27 2018-04-15 adquisición de vehículos y Management Selection Implementation maquinaria PE-COPESCO-35879-CS-INDV / Actualización del Plan de Integrated Solid Waste Individual Consultant Pending Inclusión Social de Segregadores IBRD / 83060 Post Open 16,119.00 0.00 2016-08-23 2016-10-11 2016-11-01 2016-12-06 2017-11-27 Management Selection Implementation para RR SS: Cusco, Calca y Urubamba PE-COPESCO-35955-CS-INDV Integrated Solid Waste Individual Consultant Pending / Integración y edición técnica IBRD / 83060 Post Direct 6,000.00 0.00 2016-07-22 2016-08-01 2016-08-22 2016-09-26 2018-12-31 Management Selection Implementation del EIA PE-COPESCO-35913-CS-INDV Institutional Strengthening, / Asistente técnico de Individual Consultant Pending IBRD / 83060 Management and Monitoring and Post Open 36,108.00 0.00 2017-01-16 2017-03-06 2017-03-27 2017-05-01 2018-12-31 supervisión y monitoreo del Selection Implementation Evaluation componente riesgo PE-COPESCO-35944-CS-INDV Institutional Strengthening, Individual Consultant Pending / Supervisión del plan de IBRD / 83060 Management and Monitoring and Post Open 82,186.00 0.00 2016-10-06 2016-11-24 2016-12-15 2017-01-19 2018-12-31 Selection Implementation competitividad Evaluation PE-COPESCO-35894-CS-INDV Institutional Strengthening, Individual Consultant Pending / Asistente de supervisión fondos IBRD / 83060 Management and Monitoring and Post Open 31,050.00 0.00 2018-01-15 2018-03-05 2018-03-26 2018-04-30 2018-12-31 Selection Implementation concursables 1 Evaluation PE-COPESCO-35887-CS-INDV Institutional Strengthening, Individual Consultant Pending / Asistente de supervisión fondos IBRD / 83060 Management and Monitoring and Post Open 20,700.00 0.00 2018-01-15 2018-03-05 2018-03-26 2018-04-30 2018-12-31 Selection Implementation concursables 2 Evaluation PE-COPESCO-35911-CS-INDV Institutional Strengthening, Individual Consultant Pending / Auxiliar de Adquisiciones - IBRD / 83060 Management and Monitoring and Post Open 31,050.00 0.00 2017-12-01 2018-01-19 2018-02-09 2018-03-16 2018-12-31 Selection Implementation Fondos Concursables 1 Evaluation PE-COPESCO-35962-CS-INDV Institutional Strengthening, Individual Consultant Pending / Auxiliar de Adquisiciones - IBRD / 83060 Management and Monitoring and Post Open 20,700.00 0.00 2017-11-10 2017-12-29 2018-01-19 2018-02-23 2018-12-31 Selection Implementation Fondos Concursables 2 Evaluation Institutional Strengthening, PE-COPESCO-35954-CS-INDV Individual Consultant Pending IBRD / 83060 Management and Monitoring and Post Open 47,114.00 0.00 2015-07-27 2015-09-14 2015-10-05 2015-11-09 2018-12-31 / Asistente de Contaduria Selection Implementation Evaluation PE-COPESCO-35943-CS-INDV Integrated Solid Waste Individual Consultant Pending / Especialista en Estudios de IBRD / 83060 Post Open 40,000.00 0.00 2018-01-15 2018-03-05 2018-03-26 2018-04-30 2018-06-09 Management Selection Implementation Fideicomisos financiero PE-COPESCO-35924-CS-INDV / ANTROPOLOGO Integrated Solid Waste Individual Consultant Pending IBRD / 83060 Post Open 18,600.00 0.00 2018-01-05 2018-02-23 2018-03-16 2018-04-20 2018-10-02 ESPECIALISTA EN MEDIO Management Selection Implementation AMBIENTE - PMS CALCA PE-COPESCO-35950-CS-INDV Integrated Solid Waste Individual Consultant Pending / EDUCADOR/FACILITADOR - IBRD / 83060 Post Open 13,300.00 0.00 2018-01-05 2018-02-23 2018-03-16 2018-04-20 2018-10-02 Management Selection Implementation PMS CALCA Page 3 PE-COPESCO-35896-CS-INDV / ANTROPOLOGO Integrated Solid Waste Individual Consultant Pending IBRD / 83060 Post Open 18,600.00 0.00 2017-10-30 2017-12-18 2018-01-08 2018-02-12 2018-08-26 ESPECIALISTA EN MEDIO Management Selection Implementation AMBIENTE - PMS URUBAMBA PE-COPESCO-35868-CS-INDV Integrated Solid Waste Individual Consultant Pending / EDUCADOR/FACILITADOR - IBRD / 83060 Post Open 13,300.00 0.00 2017-10-30 2017-12-18 2018-01-08 2018-02-12 2018-08-26 Management Selection Implementation PMS URUBAMBA PE-COPESCO-35952-CS-INDV Integrated Solid Waste Individual Consultant Pending / INGENIERO AGRONOMO / IBRD / 83060 Post Open 9,655.00 0.00 2017-12-02 2018-01-20 2018-02-10 2018-03-17 2018-12-13 Management Selection Implementation ZOOTECNISTA (Urubamba) PE-COPESCO-35941-CS-INDV Integrated Solid Waste Individual Consultant Pending / TECNICO AGRONOMO / IBRD / 83060 Post Open 9,655.00 0.00 2017-12-02 2018-01-20 2018-02-10 2018-03-17 2018-12-13 Management Selection Implementation ZOOTECNISTA (Urubamba) PE-COPESCO-35864-CS-INDV Integrated Solid Waste Individual Consultant Pending / INGENIERO AGRONOMO / IBRD / 83060 Post Open 14,483.00 0.00 2018-01-02 2018-02-20 2018-03-13 2018-04-17 2018-12-13 Management Selection Implementation ZOOTECNISTA (Calca) PE-COPESCO-35959-CS-INDV Integrated Solid Waste Individual Consultant Pending / TECNICO AGRONOMO / IBRD / 83060 Post Open 14,483.00 0.00 2018-01-02 2018-02-20 2018-03-13 2018-04-17 2018-12-13 Management Selection Implementation ZOOTECNISTA (Calca) PE-COPESCO-35898-CS-INDV / contratación de un consultor Servicio de Asistencia Técnica Integrated Solid Waste Individual Consultant Pending para la formulación de IBRD / 83060 Post Open 38,435.00 0.00 2016-05-09 2016-06-27 2016-07-18 2016-08-22 2017-12-30 Management Selection Implementation recomendaciones para la implementación del Proy. De RRSS PE-COPESCO-35865-CS-INDV / Asesoría técnica para Integrated Solid Waste Individual Consultant Pending IBRD / 83060 Post Open 10,000.00 0.00 2018-01-15 2018-03-05 2018-03-26 2018-10-22 2019-04-20 acompañamiento del proceso de Management Selection Implementation obra de Calca PE-COPESCO-35891-CS-INDV Institutional Strengthening, Individual Consultant Pending / Especialista par reformular el IBRD / 83060 Management and Monitoring and Post Open 15,000.00 0.00 2018-01-25 2018-03-15 2018-04-05 2018-05-10 2018-07-19 Selection Implementation Manual Operativo PRODER Evaluation PE-COPESCO-35893-CS-INDV / Contratación de consultor Arqueologo para la supervision Development and Consolidation Individual Consultant Pending IBRD / 83060 Post Open 15,600.00 0.00 2017-01-08 2017-02-26 2017-03-19 2017-04-23 2017-10-20 de la elaboración de expediente of Tourism Services Selection Implementation proyecto PISAQ- Mejoramiento vial y acondicionamiento PE-COPESCO-35960-CS-INDV Institutional Strengthening, Individual Consultant Pending / Contratación de un consultor - IBRD / 83060 Management and Monitoring and Prior Open 119,929.00 0.00 2015-11-27 2016-01-15 2016-02-05 2016-03-11 2018-12-31 Selection Implementation Oficial de Adquisiciones UGP Evaluation PE-COPESCO-35866-CS-INDV Institutional Strengthening, Individual Consultant Pending / Contratación de un consultor - IBRD / 83060 Management and Monitoring and Prior Open 126,111.00 0.00 2015-10-27 2015-12-15 2016-01-05 2016-02-09 2018-12-31 Selection Implementation Oficial Financiero Evaluation PE-COPESCO-35930-CS-INDV Institutional Strengthening, / Contratación de un consultor - Individual Consultant Pending IBRD / 83060 Management and Monitoring and Post Open 57,550.00 0.00 2018-01-15 2018-03-05 2018-03-26 2018-04-30 2018-12-16 Asistente en Monitoreo y Selection Implementation Evaluation Supervisión PE-COPESCO-35910-CS-INDV Institutional Strengthening, / Contratación de un consultor Individual Consultant Pending IBRD / 83060 Management and Monitoring and Prior Open 95,709.00 0.00 2016-05-26 2016-07-14 2016-08-04 2016-09-08 2018-12-31 Asistente en adquisiciones - Selection Implementation Evaluation turismo PE-COPESCO-35869-CS-INDV Institutional Strengthening, Individual Consultant Pending / Contratación de un consultor - IBRD / 83060 Management and Monitoring and Prior Open 145,796.00 0.00 2016-10-04 2016-11-22 2016-12-13 2017-01-17 2018-12-31 Selection Implementation Especialista en Turismo. Evaluation PE-COPESCO-35870-CS-INDV Institutional Strengthening, / Contratación de un consultor - Individual Consultant Pending IBRD / 83060 Management and Monitoring and Prior Open 156,364.00 0.00 2015-05-27 2015-07-15 2015-08-05 2015-09-09 2018-12-31 Especialista en Gestión de Selection Implementation Evaluation Residuos Solidos PE-COPESCO-35947-CS-INDV Institutional Strengthening, / Contratación de un consultor - Individual Consultant Pending IBRD / 83060 Management and Monitoring and Prior Open 175,614.00 0.00 2017-12-01 2018-01-19 2018-02-09 2018-03-16 2018-12-31 Especialista en gestión de Selection Implementation Evaluation Riesgos de Desastres PE-COPESCO-35958-CS-INDV Institutional Strengthening, / Contratación de un consultor Individual Consultant Pending IBRD / 83060 Management and Monitoring and Post Open 26,450.00 0.00 2017-03-10 2017-04-28 2017-05-19 2017-06-23 2017-12-31 Asistente tecnico administrativo Selection Implementation Evaluation PRODER - Coordinacion General PE-COPESCO-35938-CS-CDS / Institutional Strengthening, Contratación de un consultor Pending IBRD / 83060 Management and Monitoring and Post Direct Selection Direct 13,882.00 0.00 2015-09-11 2015-09-21 2015-11-25 2016-12-31 Asesor en Salvaguardas Implementation Evaluation Sociales PE-COPESCO-35949-CS-CDS / Institutional Strengthening, Contratación de un consultor - Pending IBRD / 83060 Management and Monitoring and Post Direct Selection Direct 10,353.00 0.00 2015-09-27 2015-10-07 2015-12-11 2016-06-08 Asesor en Salvaguardas Implementation Evaluation Ambientales Page 4