IPP340 v17 '" CONTRUCTION CONSULTING CENTER-POWER COMPANY NO.1 Project: lREll.J -BG SECOND RUAL ENERGY PROJECT ·ADDITIONAL FINANCING - LV SECTION BAC GIANG PROVINCE ", VOLUME 4 ETHNIC MINORITY DEVELOPMENT PLAN CONTRUCTION CONSULTING CENTER-POWER COMPANY NO.1 ro0J ro00J ro0J Project: lREII.l-BG SECOND RUAL ENERGY PROJECT-ADDITIONAL FINANCING - LV SECTION BAC GIANG PROVINCE VOLUME 4 ETHNIC MINORITY DEVELOPMENT PLAN HEAD OF SUB PROJECT: TRAN NGOC MINH : TRAN MINH DO Ha Noi, date month year 2010 CONSTRUCTION CONSULTING CENTER HA N(Jl - 2010 Second Rual Energy Project - Additional Financing Bac Giang Province • Ethnic Minority Development Plan Table of content: Abbreviations .................................................................................................. 3 Executive summary ......................................................................................... 4 1. Introduction ................................................................................................. 4 1.1 Project overview ........................................................................................ 4 1.2 Ethnic Minorities in Vietnam ................................................................... 4 1.3 Ethnic minority policy framework ........................................................... 4 2 Socio-economic conditions of the Ethnic Minorities in the project areas. 4 2.1 Ethnic minorities in the project areas ...................................................... 4 2.2 Features of EM people .............................................................................. 7 2.3 Preliminary screening of the EMs in the project areas ........................... 8 2.4 Land possession information of the EMs in the project areas ................ 8 2.5 Farming system of the EMs in the project areas ..................................... 8 3 Legal framework .......................................................................................... 8 3.1 The OP 4.10 on Indigenous people of the World Bank ........................... 8 3.2 Vietnamese law .......................................................................................... 8 3.3 Organizations and institutions that undertake the EMs ......................... 9 4 Public Consultation ...................................................................................... 9 5 Implementation arrangement ...................................................................... 9 6 Implementation program ............................................................................ l 0 7 Implementation plan ................................................................................... 10 8 Monitoring and supervision ........................................................................ 10 9 Cost and budget ........................................................................................... 10 1 Introduction ................................................................................................. 12 1.1 Project introduction ................................................................................. 12 1.1.1 Project objectives .................................................................................... 12 1.1.2 Project scale ............................................................................................ 12 1.2 Ethnic Minority Development Plan (EMDP) ......................................... .13 1.3 Policy framework for EM people ............................................................ 13 1.4 Ethnic Minorities in Vietnam .................................................................. 13 2 Socio-economic conditions of the EMs in the project areas ..................... .14 2.1 Ethnic Minorities in the project areas ................................................... .14 2.1.1 Overview ofBac Giang province ............................................................ 14 2.2 Features of Ethnic Minorities .................................................................. 17 2.2.1 The Tay ................................................................................................... 17 2.2.2 The Dao ........................................................................................................ 18 2.2.3 The Hoa .................................................................................................. 18 2.2.4 The San Chay ......................................................................................... 19 2.2.5 The San Diu ............................................................................................20 2.2.6 The Nung ................................................................................................ 21 Construction Consulting Center - Power Company No.1, 1 Second Rual Energy Project Bac Giang Province Additional Financing • Ethnic Minority Development Plan 2.3 Preliminary screening of the EMs in the project areas .......................... 21 2.4 Land ownership information of the EMs in the project areas ............... 22 2.5 Farming land system of the EMs in the project areas ............................ 22 3 Legal framework ......................................................................................... 23 3.1 The OP 4.10 on Indigenous people of the World Bank .......................... 23 3.2 Vietnamese law ......................................................................................... 23 3.3 Organizations and institutions undertake the ethnic minorities ........... 24 4 Project Impact on Ethnic Minorities ......................................................... 25 5 Public Consultation ..................................................................................... 25 5.1 Objectives of the public consultation program ...................................... .25 5.2 Information dissemination and public consultation campaign ............. 25 6. Implementation arrangement .................................................................... 27 6.1 Responsibilities ......................................................................................... 27 6.1.1 Project management board ofPC1 ........................................................ 27 6.1.2 District/Commune People's Committee ..................................................28 6.1.3 Provincial People's Committee ............................................................... 28 7 Implementation program ............................................................................ 28 8 Implementation Plan ................................................................................... 28 9. Monitoring and supervision ....................................................................... 29 10 Cost and budget ......................................................................................... 29 Appendices ...................................................................................................... 30 Construction Consulting Center Power Company No.1, 2 Second Rual Energy Project - Additional Financing Bac Giang Province • Ethnic Minority Development Plan Abbreviations CPC Commune People's Committee CEM Committee for Ethnic Minority DMS Detailed Measurement Survey DRB District Recompense Board DP(s) Displaced Person(s) GOV Government of Vietnam HH(s) Household(s) IMA Independent Monitoring Advisor LURC Land Usage Right Certification CCC-PCl Construction Consulting Center - Power Company No.1 PPC Provincial People's Committee PRC Provincial Recompense Committee WB World Bank VDIC Vietnam Development and Information Center PPS Provincial Power company PMB Project Management Board EM Ethnic Minority MOF Ministry of Finance EMDP Ethnic Minority Development Plan RAP Resettlement Arrangement Plan Construction Consulting Center - Power Company No.1, 3 Second Rual Energy Project - AddJtional Financing Bac Giang Province • Ethnic Minority Development Plan Executive summary 1. Introduction 1.1 Project overview The Bac Giang - Second Rural Energy Project - Additional Financing is scheduled to rehabilitate, upgrade and expanse the LV power networks in 7 districts in Bac Giang, improving the distribution business services of Bac Giang MY power network, meeting the local's development. The Bac Giang - Second Rural Energy Project - Additional Financing is proposed to be invested in rehabilitating, upgrading and expanding its power network system, improving the power supply quality to all households in 27 communes of 7 districts covered by the project. These districts name Tan Yen, Luc Nam, Luc Ngan, Lang Giang, Yen Dung, Yen The and Viet Yen. The project components are: - Rehabilitation of 0.4 KV Low Voltage TIL: 393.091 km - New constroction of electricity meter: 51.609 unit 1.2 Ethnic Minorities in Vietnam The ethnic minority people are commonly among the poor groups and have enjoyed limited benefits from social development and they are vulnerable to possible outside impacts by such as land requisition and housing remove. etc. The EMDP aims at providing information for ethnic groups in the project areas and is conducted in compliance with WB policy OP 4.10, ensuring (a) the respect of characteristics of culture and tradition of the ethnic groups, (b) minimize negative impacts on ethnic groups during development progress and, (c) ethnic groups will be entitled to socio-economic interests. 1.3 Ethnic minority policy framework This project is prepared in line with the WB's Policy framework and Guidelines of setting up ethnic minority development plan. This policy is developed based on the WB's OP 4.10 and the Vietnamese Gov's policy on Ethnic minority. 2 Socio-economic conditions of the Ethnic Minorities in the project areas 2.1 Ethnic minorities in the project areas Construction Consulting Center - Power Company No.1, 4 Second Rual Energy Project - Additional Financing Bac Giang Province • Ethnic Minority Development Plan Overview of Bac Giangprovince * Natural characteristics and current environment a) Geography and population Bac Giang is the midland and mountainous province, contiguous to the Northeastern, the Red River Delta and the Northwestern. It borders with Quang Ninh province in the northeastern, with Quang Ninh and Hai Duong provinces in the east, with Thai Nguyen and Ha Noi capital in the west, with Thai Nguyen and Lang Son in the northwest, with Bac Ninh in the south and southwest. . Bac Giang has the natural area of 3,823 km2, accounting for 12% of the whole nation area The total population up to the 31st December, 2009 is 1,755,720 persons. The average population density is 407 personslkm2. Bac Giang has over 26 ethnic groups living together, of which Kinh and Nung are majority. Bac Giang has the administrative structure of 9 districts and 1 city, including 7 mountainous districts namely Son Dong, Luc Nam, Luc Ngan, Yen The, Tan Yen, Yen Dung and Lang Giang, and 2 midland districts namely Hiep Hoa and Viet Yen, with 229 wards and towns. With the favorable geographical position, Bac Giang is considered as the gate of economic, cultural, scientific-technical exchanges among the Tonkin Delta, Ha Noi capital and the northern provinces, and among the the northern provinces and Quang Tay province of China. Especially, Ha Noi capital next to Bac Giang is the 1st high ranking extensive market of agricultural and forest products, paper, fabric, chemical substance for industry made in Bac Giang area. b) Topography Bac Giang topography has two sub-areas including midland and mountainous ones with plain interposed. The fonner covers two districts of Hiep Hoa, Viet Yen and Bac Giang city. The later covers 7 districts of Son Dong, Luc Nam, Luc Ngan, yen The, Tan Yen, Yen Dung, Lang Giang, of which some parts are high mountainous areas. The prominent features of the terrain area (accounting for 72% of the whole province area) are strong separated, complicated and highly uneven in term of height leveL It has much rich land area, particularly natural forest. The low land hill is available for planting fruit and industrial trees such as Thieu litchi, orange, lemon, custard-apple, persimmon, soybeans, green tea v.v. or feeding livestock, poultry, aquatic products. The prominent features of the midland area (accounting for 28% of the whole province area) are hill and hillock land intermingled with large, narrow plain. This area is available for planting foodstuff, fruit and industrial trees and feeding livestock, poultry, fish and many kinds of aquatic product. c) Climate Construction Consulting Center - Power Company No.1, 5 Second Rual Energy Project - Additional Financing Bac Giang Province • Ethnic Minority Development Plan Bac Giang locates in the mountainously tropical and monsoon climate and has rarely long illuminated time. The non-tropical features expose clearly during the winter with the temperature in both high and low areas not meeting tropical temperature standard. The annual average temperature is from 19.3oC to 23.4oC. The annual average rainfall is 1.400 to 2.376mm. The annual average humidity is 73-87%. Total sunny hours per year are from 1.700 to 1.700. The average wind speed is from 1.6 to 2.2 rnIsecond. The valleys has always received cyclone. The storms from East Sea have rarely got to Bac Giang. d) Natural resource Bac Giang has total natural area of 382,200 ha, including 123 thousands ha of agriculture land, 110 thousands ha of forestry land, 66.5 thousands ha of urban land, .. specialized usage land and residential land and other kinds. In general, Bac Giang has much favorable conditions for developing industry, agriculture, forestry and fishery. The number IA road recently built has made it more advantages for developing industry and service. The province's agriculture land is not only for paddy cultivating and also useful for planting vegetables, tuber, fruit supplying for Ha Noi capital and contiguous provinces. It has set up plan of changing dozens thousands ha of paddy land to develop fruit and industrial trees and for high quality aquaculture. Over 20 thousands ha of unused hill and hillock are big potentials for enterprises and investors to cooperatively afforest, process forestry products and cultivating aquaculture. eJ Commerce. service and tourism In recent years, the service sector has witnessed the relatively fast growth and played the important role in fostering production development. The system of commerce, tourism and hotel has fairly developed, getting 12,800 units in 2006, of which the repair trade part accounted for 53.5%, the tourism and hotel part 33.9%, the private service 12.6%. In 2010, it has 14,950 units, of which the repair trade accounts for 62.8%, the %, the tourism and hotel part 23.7%, the private service 13.4%. * Socio-economic characteristics aJ Agriculture *Agriculture - Food production: The food output has seen the considerable development step in the year 1997 with 275 thousands ton, increasing of 82 thousands ton compared to that of the year 1990 and the annual average increase output of 11.7 thousands ton/year. - Cultivating: In this sector, the GOP density of fruit and industrial tree has relatively quickly raised, of which industrial tree part is 12.2%. The fresh green tee production in 2009 obtained 23 thousands ton, increasing of 6 thousands ton compared to that of the year 2006. *Forestry The GOP density of this sector is mainly from afforestation and forestry products exploitation value. In recent years, GOP density from afforestation has quickly raised and got 9.5% in 2006 and 21.4% in 2009. Construction Consulting Center - Power Company No.1, 6 Second Rual Energy Project - Additional Financing Bac Giang Province • Ethnic Minority Development Plan b) Industry Bac Giang's industry sector so far has clearly defined sub-sectors as the follows: + Mining industry includes of coal, fossil coal and the other ones. + Processing industry includes of foodstuff, beverage, clothing, leather tanning, wood, paper, machines one and so on. c) Infrastructure In recent years, the appearance of Bac Giangprovince has much continuous changes. The industrial zones, industrial areas and many modem buildings are rising strongly. The Bac Giangconstruction sector determines that the plan work should be parallel with the city development and take more advance so that it can make the province the overall city picture of modem and beautiful architectural space. The project area has the ethnic minority group named Tay, Nung, Dao, San Diu, San Chay(Cao Lan), Hoa... The characteristics of the ethnic minority group in project area are as follow: *. Average of family size 4.2 persons -Man 51% - Women 49% * Age groups - 1 - 17 yrs old 36% - 1 8-60 yrs old 57% - Above 60 yrs 7% * Heads ofHH -Male 89% - Female 11% * Education standard - Intermediate/college 0,5 % - High school 7.5% - Primary 39% - Secondary 52% - Illiterate 1% * Occupation agriculture and breeding * Average annual per capital income 3,500,000 VND/person/year 2.2 Features of EM people Construction Consulting Center - Power Company No.1, 7 Second Rual Energy Project - Additional Financing Hac Giang Province • Etbnic Minority Development Plan Each group of ethnic minority has its private characteristics and tradition. 2.3 Preliminary screening of the EMs in the project areas There are the ethnic group of Tay, Nung, Dao, San Diu, San Chay(Cao Lan), Hoa with total HHs of 5781 in the project area. 2.4 Land possession information of the EMs in the project areas Most of the cultivation land of the EMs is field land hill land. Besides, it still has residential and garden land. 2.5 Farming system of the EMs in the project areas Farming, forestry and fruit trees planting are main production activities of the ethnic minorities in the project area. 3 Legal framework 3.1 The OP 4.10 on Indigenous people of the World Bank The plan is developed based on OP 4.10 on Indigenous People of the World Bank and the GOV policies on EM. The OP 4.10 stipulates that: "The Bank's general objective towards indigenous people as well as all the people of its member countries is to ensure that the development process fosters full respect for their dignity, human rights, and cultural uniqueness. Particularly, the crucial objective of this directive is to ensure that indigenous people do not suffer adverse effects during the development process, particularly from Bank- financed projects, and that they receive culturally compatible social and economic benefits." and "The Bank's policy is that the strategy for addressing the issues pertaining to indigenous people must be based on the informed participation of the indigenous people themselves. Thus, identifying local preferences through direct consultation, incorporation of indigenous knowledge into project approaches, and appropriate early use of experienced specialists are core activities for any project that affects indigenous people and their rights to natural resources and economy". 3.2 Vietnamese law Equality right of people living in Vietnam is clearly stipulated in the 1992 Constitution. Article 5 of which stipulates that "The Socialist Republic of Vietnam is an united nation with many nationalities. The State implements an equality and united policy and supports spiritually all nationalities and prohibits race discrimination and separation. Each nationality has the right to use its own language and ways of living Construction Consulting Center - Power Company No.1, 8 Second Rua. Energy Project - Additional Financing Hac Giang Province • Ethnic Minority Development Plan to preserve their characteristics and to improve its own good traditional and cultural customs. The State carries out a policy to develop thoroughly and gradually improve the quality of life of ethnic minorities in Vietnam physically and spiritually". One of the most important policies on ethnic groups is the Government Guidance No. 525/TTg dated November 2nd 1993 regarding in detail on implementation guiding of development in high land areas and ethnic area with the main points (i) develop infrastructure especially transportation road system and fresh water supplying; (ii) step by step strengthen food security and (iii) consolidate education system; adjusting education program based on characteristic of provinces, creating favor conditions and supporting the irregular education program and developing internal economic force. 3.3 Organizations and institutions that undertake the EMs There are some professional organizations and institutions responsible for the ethnic minority issue i.e. Council of Ethnic Minorities under National Assembly. It plays an important role in making decisions on all projects/programs or issues related to EM and mountainous area. The other important institution is the Committee for Ethnic Minorities and Mountainous Areas (CEMMA). CEMMA is the member of the Government. Each local also has the respective institution, i.e. provincial level has the provincial Ethnic Minorities Committee. 4 Public Consultation Disclosing information to and consulting the affected EM people who live in the project areas and the related entities in order to minimize complaint - caused risks and conflict and reasons making the project slower. Furthermore, this participation is the good way to find out the EMs' demand and to bring the most suitable socio- economic benefits to them. The specific consultation programs are: - Providing affected EM people with sufficient information about the project's objectives and scale and the preferential actions for them. - Collecting information of the EM people's demand and their priority as well as their feedback contributions to the WB's policies. 5 Implementation arrangement Project Management Board (PMB) on behalf of Bac Giang province is responsible for implementing investment, survey, design as well as monitoring the EMDP. CCC- PC1 also directly guides all the project implementation procedures, including EMDP implementation. Furthermore, this project is supported by the people's committee at province, district and commune levels, and other related institutions. Construction Consulting Center - Power Company No.1, 9 Second Rual Energy Project - Additional Financing Bac Giang Province • Ethnic Minority Development Plan 6 Implementation program The detail of implementation arrangement are described in Table 7 of this report. 7 Implementation plan Just after the project's investment capital is ratified, the EM will be fully informed again of the project as well as their entitlements. These information will get them by the manner of delivering the project RlB, leaflets, etc. The implementation plan timetable is as follows: ! • Ordinal No Works Schedules 1 EMDP Drawing QIJJ2010 2 EMDP Approval QIIJJ2010 3 EMDP Implementation QIII/2010 to QIIJJ2010 4 Payment QIIJJ2010 to QIIJJ2010 8 Monitoring and supervision PMB of Bac Giang will be responsible for monitoring the EMDP implementation plan. However, an independent external consulting agency will do independent monitoring activities. This supposed unit will sign a contract with PMB immediately after EMDP approval and start doing monitoring activities at the beginning of the EMDP implementation phase. 9 Cost and budget The executive objectives of the EMDP is to bring benefits to all EMs who live in the project areas. The budget is from the counterpart funds of the Bac Giang Provincial people's Committee. Construction Consulting Center - Power Company No.1, 10 Second Rual Energy Project - Additional Financing Bac Giang Province • Ethnic Minority Development Plan Estimated costs for the EMDP programs in Bac Giangare as bellows: Total price Ordinal (VND) Articles unit volume (VND) No Bac Giang PPC's I implementation cost 126.000.000 Cost for preparation 1 and starting EMDP's commune 20 5.000.000 100.000.000 programs 2 Training on agriculture class 3 1.000.000 3.000.000 Training on electric 3 class 3 1.000.000 3.000.000 safety Training documents on 4 agriculture and electric commune 20 1.000.000 20.000.000 safety II Contingency 100/0xl 12.600.000 III Total 138.600.000 Construction Consulting Center - Power Company No.1, 11 Second Rual Energy Project Additional Financing Dac Giang Province • Ethnic Minority Development Plan 1 Introduction 1.1 Project introduction 1.1.1 Project objectives The Bac Giang Second Rural Energy Project - Additional Financing is scheduled to rehabilitate, upgrade and expanse the LV power networks in 7 districts in Bac Giang, improving the distribution business services of Bac Giang MV power network, meeting the local's development. The Bac Giang - Second Rural Energy Project - Additional Financing is proposed to be invested in rehabilitating, upgrading and expanding its power network system, improving the power supply quality to all households in 27 communes of 7 districts covered by the project. These districts name Tan Yen, Luc Nam, Luc Ngan, Lang Giang, Yen Dung, Yen The and Viet Yen. The project components are: - Rehabilitation of 0.4 KV Low Voltage TIL: 393.091 km - New construction of electricity meter: 51.609 unit The current additional charge data shows that several households have not been connected to the power network yet. Moreover, there are some places suffered from overload with high loss of electricity and low service quality. Therefore, implementing this project will not only satisfy the ever increasing additional charge requirement but meet comprehensive economic, cultural, political, social development demand for the project areas in particular and the whole society in general. 1.1.2 Project scale * Low voltage TIL - Rehabilitation of 0.4 KV Low Voltage TIL: 393.091 km - New construction of electricity meter: 51.609 unit In which: - Rehabilitation ofO.4 KV Low Voltage TIL: 38.35 Km - Conductor: AV-120, 95, 70, 50,35 To implement the rehabilitation and expansion of LV system, land acquisition will be required. However, rehabilitation and expansion of LV systems will not cause large scale ofland acquisition and resettlement. Construction Consulting Center - Power Company No.1, 12 Second Rual Energy Project - Additional Financing Bac Giang Province • Ethnic Minority Development Plan 1.2 Ethnic Minority Development Plan (EMDP) The Bac Giang - Second Rural Energy Project - Additional Financing is proposed to be invested in rehabilitating, upgrading and expanding its power network system, improving the power supply quality in rural area to all households in 27 communes of 7 districts covered by the project. These districts name Tan Yen, Luc Nam, Luc Ngan, Lang Giang, Yen Dung, Yen The and Viet Yen. In some of which there are EMs affected by the project. They are Tan Yen district (Nha Nam, Quang Tien, Song Van, Tan Trung, and Phuc Hoa communes), Luc Nam district (Cam Ly, Dong Hung, Huyen Son, and Tam Di communes) , Luc Ngan district (Bien Dong, Phong Van, Quy Son, Tan Quang, and Tan Son communes), Lang Giang district (Nghia Hung commune) and Yen The district (Dong Ky, Dong Tam, Huong Vi, Tam Hiep, and Tam Tien communes). The EMDP's objective is to ensure that the construction process of "The Rural Distribution Power Network Project - Bac Giangprovince" shall not cause large affected scale to local people's lives such as socio-economical and cultural life. It also means that there are no negative impacts on EM but many benefits from the project for EM people. 1.3 Policy framework for EM people The WB Policy framework and its Guideline for EM people have been prepared for the project. This policy framework is developed based on the WB's OP 4.10 and the Gov's policy both on EM people. The Guidelines are to ensure that all EM people will be fully informed, consulted and participate into the project's investigation process. Their participation is not only serve them firm benefits but also protect them from the negative impacts during development progress. The report named "EMDP" is developed in line with these Guidelines (See detail in Appendix "Policy framework and Guideline for EMDP"). 1.4 Ethnic Minorities in Vietnam The ethnic minority people are commonly among the poor groups and have enjoyed limited benefits from social development and they are vulnerable to possible outside impacts by such as land requisition and housing remove. etc. WB policy aims to recognize potential impacts and analyze cultural tradition and customs of the affected persons in order to build up the best action plan to support them. During plan building process, the policy frameworks should be carefully studied before applying into the implementation stage. For this project. all administration units under EVN related to the preparation and Construction Consulting Center - Power Company No.1, 13 Second Rnal Energy Project - Additional Financing Bac Giang Province • Ethnic Minority Development Plan implementation of this EMDP will be responsible for preparation and implementation ofEMDP. Thus, the information ofEMDP's consultancy and public consultation, and executive, grievance and monitoring organizations has been presented in EMDP profile. The compensation and rehabilitation policy for EM people affected is as similar to the other DPs. There are only special policies and programs mentioned in EMDP basing on the consultation result and feedbacks from EM people and local authorities in the project affected areas. The EMDP aims at providing information for ethnic group in the project areas. It is conducted in compliance with WB's policy (OP 4.10) in order to ensure that (a) paying respect of EM people's tradition and culture; (b) Maximizing the project's negative effects on ethnic groups; and (c) ethnic groups will be entitled to socio- economic interests. 2 Socio-economic conditions of the EMs in the project areas 2.1 Ethnic Minorities in the project areas 2.1.1 Overview ofBac Giang province * Natural characteristics and current environment a) Geography and population Bac Giang is the midland and mountainous province, contiguous to the Northeastern, the Red River Delta and the Northwestern. It borders with Quang Ninh province in the northeastern, with Quang Ninh and Hai Duong provinces in the east, with Thai Nguyen and Ha Noi capital in the west, with Thai Nguyen and Lang Son in the northwest, with Bac Ninh in the south and southwest. Bac Giang has the natural area of3,823 km2, accounting for 12% of the whole nation area The total population up to the 31st December, 2009 is 1,755,720 persons. The average population density is 407 personslkm2. Bac Giang has over 26 ethnic groups living together, of which Kinh and Nung are majority. Bac Giang has the administrative structure of 9 districts and 1 city, including 7 mountainous districts namely Son Dong, Luc Nam, Luc Ngan, Yen The, Tan Yen, Yen Dung and Lang Giang, and 2 midland districts namely Hiep Hoa and Viet Yen, with 229 wards and towns. With the favorable geographical position, Bac Giang is considered as the gate of economic, cultural, scientific-technical exchanges among the Tonkin Delta, Ha Noi capital and the northern provinces, and among the the northern provinces and Quang Tay province of China. Especially, Ha Noi capital next to Bac Giang is the 1st high ranking extensive market of agricultural and forest products, paper, fabric, chemical substance for industry made in Bac Giang area. b) Topography Construction Consulting Center - Power Company No.1, 14 Second Rnal Energy Project - Additional Financing Bac Giang Province • Ethnic Minority Development Plan Bac Giang topography has two sub-areas including midland and mountainous ones with plain interposed. The former covers two districts of Hiep Hoa, Viet Yen and Bac Giang city. The later covers 7 districts of Son Dong, Luc Nam, Luc Ngan, yen The, Tan Yen, Yen Dung, Lang Giang, of which some parts are high mountainous areas. The prominent features of the terrain area (accounting for 72% of the whole province area) are strong separated, complicated and highly uneven in term of height level. It has much rich land area, particularly natural forest. The low land hill is available for planting fruit and industrial trees such as Thieu litchi, orange, lemon, custard-apple, persimmon, soybeans, green tea v.v. or feeding livestock, poultry, aquatic products. The prominent features of the midland area (accounting for 28% of the whole province area) are hill and hillock land intermingled with large, narrow plain. This area is available for planting foodstuff, fruit and industrial trees and feeding livestock, poultry, fish and many kinds of aquatic product. c) Climate Bac Giang locates in the mountainously tropical and monsoon climate and has rarely long illuminated time. The non-tropical features expose clearly during the winter with the temperature in both high and low areas not meeting tropical temperature standard. The annual average temperature is from 19.3oC to 23.4oC. The annual average rainfall is 1.400 to 2.376mm. The annual average humidity is 73-87%. Total sunny hours per year are from 1.700 to 1.700. The average wind speed is from l.6 to 2.2 mlsecond. The valleys has always received cyclone. The storms from East Sea have rarely got to Bac Giang. d) Natural resource Bac Giang has total natural area of 382,200 ha, including 123 thousands ha of agriculture land, 110 thousands ha of forestry land, 66.5 thousands ha of urban land, specialized usage land and residential land and other kinds. In general, Bac Giang has much favorable conditions for developing industry, agriculture, forestry and fishery. The number IA road recently built has made it more advantages for developing industry and service. The province's agriculture land is not only for paddy cultivating and also useful for planting vegetables, tuber, fruit supplying for Ha Noi capital and contiguous provinces. It has set up plan of changing dozens thousands ha of paddy land to develop fruit and industrial trees and for high - quality aquaculture. Over 20 thousands ha of unused hill and hillock are big potentials for enterprises and investors to cooperatively afforest, process forestry products and cultivating aquaculture. e) Commerce. service and tourism In recent years, the service sector has witnessed the relatively fast growth and played the important role in fostering production development. The system of commerce, tourism and hotel has fairly developed, getting 12,800 units in 2006, of which the repair trade part accounted for 53.5%, the tourism and hotel part 33.9%, the private service 12.6%. In 2010, it has 14,950 units, of which the repair trade accounts for 62.8%, the %, the tourism and hotel part 23.7%, the private service 13.4%. Construction Consulting Center - Power Company No.1, 15 Second Rua) Energy Project - Additional Financing Bac Giang Province • Ethnic Minority Development Plan * Socio-economic characteristics aJ Agriculture *Agriculture - Food production: The food output has seen the considerable development step in the year 1997 with 275 thousands ton, increasing of 82 thousands ton compared to that of the year 1990 and the annual average increase output of 11.7 thousands ton/year. - Cultivating: In this sector, the GOP density of fruit and industrial tree has relatively quickly raised, of which industrial tree part is 12.2%. The fresh green tee production in 2009 obtained 23 thousands ton, increasing of 6 thousands ton compared to that of the year 2006. * Forestry The GOP density of this sector is mainly from afforestation and forestry products exploitation value. In recent years~ GOP density from afforestation has quickly raised and got 9.5% in 2006 and 21.4% in 2009. b) Industry Bac Giang's industry sector so far has clearly defined sub-sectors as the follows: + Mining industry includes of coal, fossil coal and the other ones. + Processing industry includes of foodstuff, beverage, clothing, leather tanning, wood, paper, machines one and so on. c) Infrastructure In recent years, the appearance ofBac Giangprovince has much continuous changes. The industrial zones, industrial areas and many modem buildings are rising strongly. The Bac Giangconstruction sector determines that the plan work should be parallel with the city development and take more advance so that it can make the province the overall city picture of modem and beautiful architectural space. The project area has the ethnic minority group named Tay, Nung, Muong, Dao, Thai, San Diu, San Chay(Cao Lan), Hoa... The characteristics of the ethnic minority group in project area are as follow: *. Average of family size 4.2 persons -Man 51% - Women 49% * Age groups - 1 - 17 yrs old 36% - 1 8-60 yrs old 57% - Above 60 yrs 7% * HeadsofHH Construction Consulting Center - Power Company No.1, 16 Second Rual Energy Project - Additional Financing Bac Giang Province • Ethnic Minority Development Plan - Male 89% - Female 11% * Education standard - Intermediate/college 0,5 % - High school 7.5% -Primary 39% - Secondary 52% - Illiterate 1% * Occupation agriculture and breeding * Average annual per capital income 3,500,000 VND/person/year 2.2 Features of Ethnic Minorities 2.2.1 The Tay Population In Vietnam, The Tay belongs with the Tay-Thai group of languages have about one million five hundred thousand people,whose very crowed in ethnic minority. The Tay have other name the Tho and include of groups: Ngan, Phen, Thu Lao, Pa Di. The Tay resides in valleys, mountains slope in Cao Bang province, Lang Son province, Bac Giangprovince, Bac Can province, Thai Nguyen province and a number of regions in Bac Giang province. etc. Language: The Tay language belongs to Tay language system. Economy The Tay have a traditional agriculture with crop plants as paddy, maize, manioc ... and fruit and vegetables for season. Culture - The Tay village resides in mountains and along streams. The name of Tay village calls hills and mountains, fields, section of river. Every Tay village have fifteen, twenty houses. The large village divided many housing area. The Tay village have a house on stilts, house. In house differentiated between men room and women room. The Tay wears clothes of cotton dye in indigo-blue. Kind of clothes used by women have features: the long to calf of leg, split tunic, fives button. - The Tay dear son surpassed and stipulated for realationship member in family. Connuabiallife. Construction Consulting Center - Power Company No.1, 17 Second Rual Energy Project - Additional Financing Bac Giang Province • Ethnic Minority Development Plan - Place of worship holds center position in house. The bed in front of place of worship unused, the stranger do not lie down. - The Tay has a traditional culture of poetrys, dances, musics and purpetry. The proverb and folk-song have a lot of considerable quantity. - The Tay has a hospitality, trustful and compliant. The Tay is one integral part of Vietnam's 54 ethnic group community. 2.2.2 The Dao Population In Vietnam, The Dao belongs with the Mong-Dao group of languages have about four hundred seventy thousand people. The Dao have other name the: Man, Dong Trai, Dieu Mien, Kim Mien.etc. The Dao resides in Cao Bang province, Lang Son province, Bac Giangprovince, Bac Can province, Thai Nguyen province and a number of other regions. etc. Language: The Dao language belongs to Mong - Dao language system. Economy The Dao have means of survival is essentially agriculture. Today, a few households have turned to forestry, wet rice growing or domestic animal breeding. Culture - Their dwellings are either earthen houses or mixed (half earthen, half on stilts). The Dao believe that in all creatures there are souls called ''hon'' or " van". When a living creature dies, its soul separates from the body and becomes a phantom. They believe the world is occupied by these wandering souls, and practice the cult of ancestors to honour them. - The popular literature and arts of ethnic groups are also extremely distinct. There are many unique legends, poems and songs, with themes ranging from nature to familial and social relationships which is expressed by "Two Sisters" "Catching Sprite't stories. Rich and attractive dances include the Dance of the Bells and Drum Dance; musical instruments: Drum, Gong, Bell. - Traditional clothing: long robes, trousers, large belts, turbans and leggings. Clothes are usually black or deep blue. The Dao is one integral part of Vietnam's 54 ethnic group community. 2.2.3 The Hoa Population Construction Consulting Center - Power Company No.1, 18 Second Rual Energy Project - Additional Financing Bac Giang Province • Ethnic Minority Development Plan In Vietnam, The Hoa belongs with the Hoa group of languages have about ninety hundred people. The Hoa have other name the:Trieu Chau, Phuc Kien,Quang Dong, Xa Phang.etc. Language: The Hoa language belongs to Hoa language system. Economy The Hoa practise various occupations including agriculture, handicrafts, trading, fishing, and salt making. Hoa fanners have a long tradition of cultivating submerged fields. They also work as labourers, teachers, and cadres. Culture - The Hoa build houses with three compartments and two lean-tos and live close together. Families of a same lineage always reside together. In a Hoa family, the husband is the head of the household and the right to inherit is reserved for the sons. The eldest son always gets the greater part of the property. In all villages and hamlets, there are temples, pagodas, and shrines built for worshipping. Parents plan marriage arrangements for their children, and early marriages are common. The choice of a husband or a wife is often based on the desires of the family to have equal social standing or is dictated by business considerations. Funerals must go through several rituals. - The Hoa loves singing "son ca", musical plays. They have many musical instruments such as horns, clarinets, drums, flutes, cymbals, castanets, Chinese four-chord lute, and zither. etc. Hoa men wear clothing. Hoa women wear trousers, five-panelled vests, and short-sleeve shirts. The Hoa is one integral part of Vietnam's 54 ethnic group community. 2.2.4 The San Chay Population In Vietnam, The San Chay belongs with the Tay-Thai group of languages have about one hundred fourteen thousand people. The San Chay have other name the: Cao Lan, San Chi, Man Cao Lan, Hon Ban.etc. The San Chay resides in valleys, mountains slope in Cao Bang province, Lang Son province, Bac Giangprovince, Bac Can province, Thai Nguyen province and a number of other regions. etc. Language: The San Chay language belongs to Tay - Thai language system. Economy Construction Consulting Center - Power Company No.1, 19 Second Rual Energy Project - Additional Financing Bac Giang Province • Ethnic Minority Development Plan Their main means of living are agriculture and animal breeding Culture - They live in villages and hamlets, either along stream shores or in plains and valleys. Houses were formerly built on stilts, but today modern changes can be seen in construction. For the San Chi, religious practises for death ceremonies are extremely important. - There are many unique legends, poems and songs, with themes ranging from nature to familial and social relationships which is expressed by "Bac Thien Loi Eating Meat" story of San Chi. Telling story by poem: " Soong Co". The dances of the Gau Bird, "Xuc Tep" of the San Chi. Musical instruments: , cymbals,castanets.etc. - Traditional clothing: wear short jackets, long robes, skirts, trousers, belts, turbans, cloth shoes and jewellery, these are mainly of a black or deep blue colour. The San Chay is one integral part of Vietnam's 54 ethnic group community. 2.2.5 The San Diu Population In Vietnam, The San Diu belongs with the Han group of languages have about one hundred thirty thousand people. The San Diu have other name the: San Deo, Trai, Trai Dat, Man Quan Coc.etc. The San Diu resides in Quang Ninh province, Cao bang province, Phu Tho province,Bac Giangprovince, Bac Can province, Thai Nguyen province and a number of other regions. etc. Language: The San Diu language belongs to Han language system. Economy The San Diu engages in rice farming practices with high level. Culture - They can mainly be found living in villages and hamlets. Houses feature walls and roofs of hooked tiles. The San Diu practices the cult of ancestors, and also worship their own particular genies. - There are many unique legends, poems and songs, with themes ranging from nature to familial and social relationships which is expressed "King Toad" story; dance: "stick dance". Musical instruments: "Tu Va" is made by buffalo's horns, Flute "sema" made by snail's shell. - The San Diu has gradually adopted the Kinh style of dress. Construction Consulting Center - Power Company No.1, 20 Second Rual Energy Project - Additional Financing Bac Giang Province • Ethnic Minority Development Plan The San Diu is one integral part of Vietnam's 54 ethnic group community. 2.2.6 The Nung Population In Vietnam, The Nung belongs with the Tay-Thai group of languages have about nine hundred fifty thousand people. The Nung have other name the: Xuong, Giang, Nung An, Nung Loi, Khen Lai.etc. The Nung resides in Lang Son province, Bac Giang province, Bac Giangprovince, Bac Can province, Thai Nguyen province and a number of other regions.etc. Language: The Nung language belongs to Tay - Thai language system. Economy The Nung live mainly on rice and corn. They also grow fruit trees such as tangerines and persimmons, and anise. Culture - The Nung mainly worship their ancestors, spirits, saints, Confucius, and Kwan Yin. Nung villages are often built on hillsides. - The Nung have abundant folk arts and cultural activities including folk songs and alternative songs. The smooth melodies of Sli songs are harmonious with the natural sounds of the forests and mountains. This type of folk song is a combination of verse and music. The "Long Tong Ceremony" (Going to the Fields) is very well known and attracts many people of all ages. This ceremony is always organised during the first month of the lunar year. - The Nung mainly wear indigo attire. The Nung is one integral part of Vietnam's 54 ethnic group community. 2.3 Preliminary screening of the EMs in the project areas The project affected areas include Nha Nam, Quang Tien, Song Van, Tan Trung, Phuc Hoa commune of Tan Yen district, Cam Ly, Dong Hung, Huyen Son, Tam Di communes of Luc Nam district, Bien Dong commune, Phong Van commune, Quy Son commune, Tan Quang commune, Tan Son commune of Luc Ngan district, Nghia Hung commune of Lang Giang district, Dong Ky commune, Dong Tan commune, Huong Vi commune, Tam Hiep commune, Tam Tien commune of Yen The district. In there have ethnic groups: Tay, Dao, Hoa, San Chay, San Diu, Nung. Distributed to ethnic minority in the project areas: There are 5781 EM HHs indirectly affected by the project Construction Consulting Center - Power Company No.1, 21 Second Rual Energy Project - Additional Financing Bac Giang Province • Etbnic Minority Development Plan Number of Ordinal ProvincelDistridl List of ethnic groups in the affected EMHHsin No. Communes area the affected area BAC GIANG Province 5781 Tan Yen district 231 1 Nha Nam commune Tay, Nung, Dao 28 2 Quang Tien commune Tay, Nung 100 3 Song Van commune Tay, Nung, Muong 17 4 Tan Trung commune Tay, Nung, Cao Lan 36 5 Phuc Hoa commune Cao Lan, San Diu, Nung 50 Tan Yen district 1721 1 Cam Ly commune San Diu 105 2 Dong Hung commune Hoa, Tay, San Diu, Nung 855 3 Huyen Son commune San Diu, Hoa, Tay, Nung 106 4 Tam Di commune San Diu, Hoa, Tay, Nung 655 Luc Ngan district 2439 1 Bien Dong commune Nung, San Diu, Tay 522 2 Phong Van commune Nung, Tay 443 3 Quy Son commune San Diu, Hoa, Tay, San Chi 430 4 Tan Quang commune Nung, Hoa, Tay, Dao 124 5 Tan Son commune Nung, Tay 920 Lang Giang district 33 1 Nghia Hung commune Nung, Hoa, Tay, San Diu 33 Yen The distiict 1357 1 Dong Ky commune Nung, Tay, Cao Lan 240 2 Dong Tam commune Tay, Nung 66 3 Huong Vi commune Nung, Tay, Cao Lan, San Chi, Hoa 34 4 Tam Hiep commune Nung, Tay, Cao Lan 727 5 Tam Tien commune Nung, Tay, Cao Lan, San Diu 290 2.4 Land ownership information of the EMs in the project areas Most of the cultivation land of the ethnic minorities is the field land and hill land for forestry and fruit planting. The small remain is residential and garden land. 2.5 Farming land system of the EMs in the project areas Construction Consulting Center - Power Company No.1, 22 Second Rual Energy Project - Additional Financing Bac Giang Province • Ethnic Minority Development Plan Farming and forestry are the main agricultural cultivation activities of the ethnic minorities in the project areas. The EM farmers always hire the private motor driven plough and mobile nce shredding to harvest their crops. However. the popular tool to harvest paddy is the sickle. The EM farmers use the bio- fertilizer for their fields. The garden land is used for many purposes: planting long- term trees along with crops, feeding cow, pig, chicken, duck. The EM farmers usually plant peanut, maize, bean, sugarcane and pineapple. 3 Legal framework 3.1 The OP 4.10 on Indigenous people of the World Bank The plan is developed based on OP 4.10 on Indigenous People of the World Bank and the GOV policies on EM. The OP 4.10 stipulates that: "The Bank's general objective towards indigenous people as well as all the people of its member countries is to ensure that the development process fosters full respect for their dignity, human rights, and cultural uniqueness. Particularly, the crucial objective of this directive is to ensure that indigenous people do not suffer adverse effects during the development process, particularly from Bank- financed projects, and that they receive culturally compatible social and economic benefits." and "The Bank's policy is that the strategy for addressing the issues pertaining to indigenous people must be based on the informed participation of the indigenous people themselves. Thus, identifying local preferences through direct consultation, incorporation of indigenous knowledge into project approaches, and appropriate early use of experienced specialists are core activities for any project that affects indigenous people and their rights to natural resources and economy". 3.2 Vietnamese law Equality right of people living in Vietnam is clearly stipulated in the 1992 Constitution. Article 5 of which stipulates that "The Socialist Republic of Vietnam is an united nation with many nationalities. The State implements an equality and united policy and supports spiritually all nationalities and prohibits race discrimination and separation. Each nationality has the right to use its own language and ways of living to preserve their characteristics and to improve its own good traditional and cultural customs. The State carries out a policy to develop thoroughly and gradually improve the quality of life of ethnic minorities in Vietnam physically and spiritually". Construction Consulting Center - Power Company No.1, 23 Second Rual Energy Project - Additional Financing Hac Giang Province • Etbnic Minority Development Plan Early in 1968, the Gov issued the settle policy for ethnic minority groups in order to reduce migration trends of compatriots of various ethnic groups. One of the most important policies on ethnic groups is the Government Guidance No. 5251ITg dated November 2nd 1993 regarding in detail on implementation guiding of development in high land areas and ethnic area with the main points as follows: * Developing infrastructure especially systems of transportation road and fresh water supplying; * Gradual increase food security * Consolidating education system; adjusting education program based on characteristic of provinces, creating favor conditions and supporting the irregular education program, and developing internal economic. On June 31 st 1998, The Premier signed the Decision No. 1351 1998/QD-ITg, approving the socio-economic development programme for zones specially difficult and mountainous area (usually called the 135 Programme). The Programme aims at improving living standard materially and spiritually of people in difficult zones. It facilitates these zones to release the poverty and underdeveloped state, then keep up with the country's overall development. The program also contribute to ensure better social safety, security and defense. The main objectives of this program are as building infrastructure, accommodation, developing agriculture, forestry, and training breeding skill at the program's areas. * The Resolution No. 24-NQITW dated March 12th 2003 by the 9th Central Committee at the 7th meeting on "Ethnic Minorities Work". * The GOV's Decree No. 60/20081ND-CP dated May 9th 2008 on "Function, task, power right and mechanism of The Committee for Ethnic Minority". * Article 26 of the The Law on National Assembly Organization dated December 25 th 2001, modified and supplemented by the 11th national assembly at the 11th session on April2Dd 2007 on "Task and power right of Ethnic Minority Council". * The GOV's Directions No. 393/TTg dated June lOth 1996 on "Residential Scheme, infrastructure improvement and production arrangement at ethnic and mountainous areas". 3.3 Organizations and institutions undertake the ethnic minorities There are some professional organizations and institutions are responsible for the ethnic minority issues, i.e. Council of Ethnic Minorities under National Assembly. Council of Ethnic Minorities plays an important role in making decisions on all Construction Consulting Center - Power Company No.1, 24 Second Rual Energy Project - Additional Financing Bac Giang Province • Ethnic Minority Development Plan projects/programs or other issues related to EM and mountainous areas. The other important institution is the Committee for Ethnic Minorities and Mountainous Areas (CEMMA). CEMMA is the member of the Government. At provincial level, in provinces where EM people exist, there also has the respective institution, i.e. the Provincial Ethnic Minorities Committee. The latest GOV's Decree No. 53/2004/ND/CP dated February 12th 2004 on guiding the arrangement of institutions to implement successfully the ethnic minorities tasks. The PMBs and local authorities (People's Committee, Provincial Ethnic Committees, Resettlement Committees, Women Association, etc. at all level) are responsible for implementing EMDP. 4 Project Impact on Ethnic Minorities Most of EM people's land is paddy land and hill land for forestry and fruit planting. Other kinds of land are residential and garden land. The project's land loss areas are very small compared to the EM people's total affected land area. 5 Public Consultation 5.1 Objectives of the public consultation program Disclosing information to and consulting the affected EM people who live in the project areas and the related entities in order to minimize conflict- caused risks and mishap therefore it can find out the EMs' demand and to bring the most suitable socio-economic benefits to them. Objectives of the public consultation campaign programs are as follows: Informing about the project generally, its targets and scale particularly, proposed actions to HHs and EM people affected by the project. Collecting information of affected people and HHs' demand and their priority as well as their feedback contributions to the project's policies and proposed activities. Getting the cooperation and participation of affected people, HHs, and the public community in required actions to work out EMDP. 5.2 Information dissemination and public consultation campaign There are two phases of the public consultation for EM people. Stage I: Implemented during the EMDP setting process (finished) Step1: Propaganda and discussion with local authorities of the line route and the impact mitigation plan. Construction Consulting Center - Power Company No.1, 2S Second Rual Energy Project - Additional Financing Hac Giang Province • Ethnic Minority Development Plan This phase consisted of line route selection, census and inventory of impacts on displaced persons and affected assets, and identification of the project's mitigation strategies, compensation, rehabilitation and new-construction, and consultation of affected people and EM for EMDP. Step 2: Impact survey and statistics. Based on the agreed line routes, survey teams had clearly realized the routes sites, and coordinated with the commune agencies to make a list of EM DPs affected on land, houses, trees and crops. The socio-economic survey forms showed that 25% of households would be affected. Step 3: Meeting with local authorities and DPs' representatives. Survey teams had asked local authorities and HHs for their comments on the route alignment, potential of adverse impacts, their proposal for recompense unit cost for houses, buildings and land. During the survey time, the survey staff had to meet and directly discuss with the HHs and EM DPs the recompense plan, potential adverse impacts, and mitigation measures. The feedback information would be recorded and presented in the EMDP report. CCC-PCl had also prepared statistic forms for the socio-economic survey, and questionnaires for collecting EM DPs' contribution ideas to recompense task. Local authorities had also taken part in the consultation on the land advantages issue in case of using public land for land compensation. CCC-PCl had opened meetings with all local authorities at three levels from November 2009 to December 2009 of area relevant to the project. At the meetings, CCC-PCl required all local HHs' representatives, EM DPs, and local authorities' representatives discuss and comment the project's plans, mitigation plan, and draft EMDP's policies. The representatives from Women Union, Farmers' Associations, DOST, affected HHs, and local authorities had participated these meeting. The draft EMDP had been sent to the concerned agencies of the Bac GiangProvincial People's Committee and VDlC of the WB office in Vietnam. The final version report of EMDP would be resented to the Bac GiangProvincial People's Committee and the WB office in Vietnam. Stage 2: EMDP Implementation Step 1: Disclose the project's information for EM people. Disseminating the project's essential information to EM people. Step 2: Public Consultation on EMDP actions, training and rehabilitation programs. Constmction Consulting Center - Power Company No.1, 26 Second Rual Energy Project - Additional Financing Rac Giang Province • Ethnic Minority Development Plan At the public consultation sessions, the EM HHs affected can raise their opinions on EMDP's activities. The proposed opinions suitable for EM people's interests would be recorded. Besides, The affected people would be informed of the time, places, and operation procedures of the missions presented in EMDP. EM would be consulted in training program and others, including training project, time and training manners they maybe need. The consultation sessions with EM would receive the participation of indigenous people and be translated into ethnic language. Step 3: Information for local authorities on EMDP operation procedures. CCC-PCI will inform the commune authorities and affected EM people of procedures and process for setting up and operate EMDP. The commune authorities and District People's Committee have to ensure that all affected EM HHs in the project area would be fully informed of EMDP operation procedures and the project. 6. Implementation arrangement PMB of Bac Giang on behalf of PPC is responsible for implementing the project's tasks, including survey, design, project building and EMDP operation. The EMDP implementation needs the close cooperation of concerned agencies and local authorities. The agencies and associations responsible for forming, operating, and monitoring the EMDP include: - PMB of Bac Giang. - The Bac Giang provincial people's committee. - The project districts' people's committee. 6.1 Responsibilities 6.1.1 Project management board of PC1 PMB assigned by PC 1 is responsible for managing the project, including preparation and operation ofEMDP. Submitting EMDP to EVN and WB for its approval. - Monitoring operation process of EMDP by hiring an independent consultancy unit. - Reporting EMDP operation process results to WB. Construction Consulting Center - Power Company No.1, 27 Second Rual Energy Project - Additional Financing Bac Giang Province • Etbnic Minority Development Plan In order to carry out these tasks, the PMB needs having a functional room or a group of experienced staff specializing in keeping track of and implementing EMDP. 6.1.2 District/Commune People's Committee - Cooperating with PMB to implement EMDP. - Helping local people overcome difficulties raised in building process. Holding public meeting for disseminating essential information to do better EMDP. 6.1.3 Provincial People's Committee The project PPCs are responsible for steering cooperation among sectors and local departments in operating EMDP. 7 Implementation program The EMDP implementation program will be presented as follows: Table 7: Implementation program Ordinal Programs Responsibilities Works and Plans No. i Agriculture Training PMB,Local By PMB including I + Training of rice seed and Authorities, + project's new trees Provincial People's I commune names + Training of breeding committee and + Training plan· 1 agricultural (within one day or i stimulation an half of day) + Training of using fertilizer Association + Time and location m each commune 2 Training of electricity PMB Bac Giang byPMB 8 Implementation Plan Just after the project's investment capital is approved, the EM people will be fully informed once more of their entitlements. This information will be delivered to each EMHHbyPCI. Construction Consulting Center - Power Company No.1, 28 Second Rual Energy Project - Additional Financing Bac Giang Province • Ethnic Minority Development Plan The implementation plan is as follows: Ordinal No. Works Schedule 1 EMDP Q11/2010· 2 EMDP Approval QII1I2010 3 EMDP implementation Q1I1/2010-Q1I1/2011 4 Payment Q1I1/2010-Q1I1/2011 9. Monitoring and supervision PMB of Bac Giang will be responsible for monitoring the EMDP implementation plan. Furthermore, one independent external consulting agency will conduct the independent monitoring activities. 10 Cost and budget The activities of EMDP is to make positive effect on all EM people living in the project area. The budget is from the counterpart fund of the Bac Giang Provincial people's Committee. Estimated costs for the EMDP's programs in Bac Giangprovince: Table 10: Cost and Budget price Total Ordinal Article unit volume (VND) (VND) No EVN i I implementation cost 126.000.000 Cost for preparation i 1 and starting EMDP's . commune 20 5.000.000 100.000.000 I programs i 2 Training on agriculture class 3 1.000.000 3.000.000 Training on electric 3 class 3 1.000.000 3.000.000 safety Training documents on 4 agriculture and electric commune 20 1.000.000 20.000.000 safety II Contingency 10%*1 12.600.000 III Total 138.600.000 Construction Consulting Center - Power Company No.1, 29 Second Rual Energy Project - Additional Financing Hac Giang Province • Ethnic Minority Development Plan Appendices 1. Projects Area Map 2. Policy Framework and Guideline for EMDP 3. Preliminary Screening of the Ems in the Project Areas 4. Social Assessment Construction Consulting Center - Power Company No.1, 32 Appendix 1 Project Area Map Appendix 2 Policy Framework and Guideline for EMDP SOCIALIST REPUBLIC OF VIETNAM Ministry of Industry ETHNIC MINORITY DEVELOPMENT PLAN (EMDP) Attachment to Ministry of Industry and Commerce's Decision Number: Date: July, 2007 Table of content 1. Introduction 2. Ethnic Minorities in Vietnam 3. Policy Framework 4. Guidelines for Ethnic Minority Plan (EMP) 5. Screening 6. Social Assessment 7. Ethnic Minority Development Plan 8. Implementation Arrangement 9. Monitoring 10. Schedule 11. Budget 12. ReportingIDocumentation 1. INTRODUCTION 1. Proposed project development objective(s): The objective of the proposed project would be enabling the supply of sufficient power of acceptable quality to the rnal retail level. 2. The project will include two project components as follows: • Objectives: The objective of the proposed project would enable the supply of sufficient power of acceptable quality to the rural retail level. 3. For the subprojects to be located in the areas of Ethnic Minorities, every special efforts will be made through design and construction measures, and construction schedules to reduce adverse impacts on Ethnic Minorities. For the rehabilitation/expansion of the Medium Voltage system, the adverse impacts would be on individuals and at low-intensity, most of impacts on land of Ethnic Minorities will be temporary, some families of Ethnic Minorities will be permanently acquired land for constructing of towers/poles and substations. Therefore, the project subcomponents would not cause any culturally specific impacts on the affected ethnic minority households and the nature of impacts does not result in community- wide socio-economic effects. 4. Sub-projects may be implemented in Provinces, Districts and Communes where ethnic minority people are present as part of the population. In line with the World Bank's Operational Directive on Indigenous Peoples (OP 4.10), an Ethnic Minority Development Plan (EMDP) will be developed for areas that have ethnic minority households according to this strategy for ethnic minorities. Ethnic minorities are social groups with a social and cultural identity distinct from the dominant society that may make them vulnerable to being disadvantaged in the development process. According to OP 4.10 ethnic minorities can be identified in particular geographical areas by the presence in varying degrees of the following characteristics: (a) Self-identification and identification by others as members of a distinct cultural group; (b) Collective attachment to geogpraphically district habiats or ancestral territories in the project area to the natural resources in the habitats anh territories; (c) Customary cultural, economic, social, or political institutions that are separate from those of the dominant society anh culture; and; (d) An indigenous language, often different from the national language of the country or regIOn. 5. The purpose of this strategy is to ensure that the development process foster full respect for dignity, human rights, and cultural uniqueness of Ethnic Minority People. More specifically, the objective of this strategy is to ensure that EM do not suffer adverse effects during the development process and that they will receive culturally compatible social and economic benefits. 2. ETHNIC MINORITIES IN VIET NAM 6. Ethnic Vietnamese, known as Kinh, with about 85 per cent of total population, dominate the political, economic, and social affairs of the socialist Republic of Vietnam. There are officially another 53 ethnic groups in Viet Nam who constitute the category of ethnic minorities. Most of ethnic minorities population live in the uplands. Population of ethnic minority groups range from over a million to only a few hundreds. The only ethnic minority groups who live mainly in the lowlands are Hoa (Chinese), Cham and Khmer. 7. Ethnic minorities in Viet Nam are diverse origin. A majority (39) as well as Kinh speak languages in the Austro-Asiatic language family. But others speak Austronesian and Sino-Tibetan languages. They differ greatly in ways of livelihood, social organization. Some have had relationship with Kinh society for a long time, while others have lived in relative isolation until recent decades. Some groups have lived in their present locations for many centuries, while others had migrated into their present location within the past hundred years. 8. In the past fifty years, many ethnic minorities communities have shifted residence because of war, governmental settlement programs, or a depleted resource base. As many as five million Kinh have been relocated from the lowlands into upland areas. The biophysical, social and political context of the lives for most ethnic minorities has changed drastically in the past fifty years. 9. Equality right of people living in Vietnam is clearly stipulated in the 1992 Constitution. Article 5 of which stipulates that "The Socialist Republic of Vietnam is an united nation with many nationalities. The State implements an equality and united policy and supports spiritually all nationalities and prohibits race discrimination and separation. Each nationality has the right to use its own language and ways of living to preserve their characteristics and to improve its own good traditional and cultural customs. The State carries out a policy to develop thoroughly and gradually improve the quality of life of ethn!c minorities in Vietnam physically and culturally". 10. Since 1968, the Gov issued the settle policy for ethnic minority groups in order to reduce migration trends of compatriots of various ethnic groups. One of the most important policies on ethnic groups is the Government Guidance No. 525ITTg dated November 2nd 1993 regarding in detail on implementation guiding of development in high land areas and ethnic area with the main points as follows: * Developing infrastructure especially systems of transportation road and fresh water supplying; * Gradual increase food security * Consolidating education system; adjusting education program based on characteristics of provinces, creating favor conditions and non-format education program, and developing the internal economic . 11. Ethnic minorities in Vietnam have enjoyed better legal and political status than that in many other regional or worldwide countries do. They have received many benefits as a result of the government's policies. They have received preferential treatment in college admission processes. Cooking oil. kerosene, and iodized salt have been provided to them at heavily subsidized rates. The government, foreign donor agencies and many NGOs have organized numerous development and special assistance programs that target ethnic minorities. Very large sums of money have been invested with the intention of helping the uplands in general and ethnic minorities in particular to "catch up" with lowland areas. 12. While many probably most-ethnic minority households have better material standards of living today than they did ten or fifteen years ago. they are still not catching up with the rest of the country economically. Indeed, they are in many ways falling further behind. There are many reasons for the poverty of ethnic minority groups in Vietnam. The peoples are struggling to adapt to severe stresses placed upon • them from population pressure, resource depletion, and cultural dislocation resulting from decades of externally imposed change. Development of the region must concentrate on promoting the process of adaptive change, recognizing that it must be accomplished by the people themselves, and that they will inevitably have to devise many different ways of doing it. 3. THE STRATEGY 13. The Bank's OP 4.1 0 on Ethnic Minorities indicates that the planning framework for addressing the issues pertaining th ethnic minorities must be based on the free, prior and informed consultation of the ethnic monirities people themselves. Thus, identifying local preferences through direct consultation, incorporation of indigenous knowledge into project approaches, and appropriate early use of experienced specialists are core activities for any project that affects Ethnic Minority Peoples and their rights to natural and economic resources. 14. The State of Viet Na1Jl has the policy of not discriminating against Ethnic Minority Peoples as showed by the presence of Ethnic People Council in the National Assembly and Ethnic People Committee in the Government. Article 94 in the 1992 Constitution states that the Ethnic People Committee has the right to submit proposals, plans or related issues of indigenous peoples to the Assembly, monitor, control the implementation of national policies, development programs on various areas such as education, health care, etc. Article 5 of the Constitution also indicates that ethnic minority people could use their own languages to reserve its cultural distinctions. In the Government of Viet Nam, directly under the supervision of the Prime Minister is the Committee of Ethnic Minorities (which is equivalent to a Ministry). Development programs are supervised by this Committee, such as the poverty reduction Program No. 135 according to the degree No. 135/1998/QD-TTg of the Prime Minister to promote the construction of small-scale infrastructure in poor ethnic minority villages. 15. According to the Government of Vietnam, ethnic minorities have the following characteristics: - An intimate understanding and long stay in the territory, land or area of their ancestors closed attachment to the natural resources; - Self-identification and recognized by neighboring members by their distinctive culture - A language different from the national language - A long traditional social and institutional system - A self-provided production system. 16. This strategy will applied to all of the sub-projects of Rural Distribution Power Network Project where applicable. 4. ETHNIC MINORITY PLANING FRAMEWORK (EMPF) 17. In case the project involve the preparation and implementation of annual investment programs or mutilple subprojects and when the screening indicates that ethnic minority groups are like to be present in, or have collective attachment to, to project area, but their presence or collective attachment can not be determined until the subprojects are indentified, the EMPF provides for the screening snh review of these subprojects The planning framework seeks to ensure that ethnic minorities are well informed, consulted and mobilized to participate in the sub-project to be supported by Rural Distribution Project. Their participation can either provide them benefits with more certainty, or protect them from any potential adverse impacts of sub-project to be financed by the project. The main features/process of the EMPF will be a preliminary screening process, then a social assessment to determine the degree and nature of impact of each work under the sub-project, and a plan will be developed if warranted. Consultations with and participation of the ethnic. minority population, their leaders and local government officials will be an integral part of the overall EMPF. 5. SCREENING 18. All communes which have ethnic minority communities and are candidates for sub-Project will be visited (at the time of first consultation with communes) by PCs, relevant local authorities consultants. Prior to the visit, respective PCs will send a letters to the communes informing the commune leaders that they will be visited by the respective PCs and local authorities which would like to discuss about the sub- project. The letter will request that the commune invite to the meeting representatives of farmers and women associations, village leaders, and key staff of commune for discussion on the sub-project. During the visit, the commune leaders and other participants will present their views with regards to the sub- project. 19. At this visit. the social scientists (consultants) andlor local Women-s Union will undertake a screening for ethnic minority population with the help of ethnic minority leaders and local authorities. The screening will check for the follows: (a.) Names of ethnic groups in the commune (b) Total number of ethnic minority groups in the commune (c) Percentage of ethnic minority of commune population (d) Number and percentage of ethnic minority households along the zone of influence of the proposed sub-Project. 20. If the results show that there are ethnic minority communities in the zone of influence of the proposed sub-project, a social impact assessment will be planned for those areas. 6. SOCIAL ASSESSMENT 21. The social impact assessment (SA) will be undertaken to evaluate the project's potential positive anh adverse effects on the ethnic minority groups, and to examine project alternatives where adverse effects may be signficant. The breadth, depth, and type of analysis in the social assessment are proportional to the nature and scale of the project's potential effects on the ethnic minorities, whether such effects are positive or adverse (see annex 2 for details). The social assessment is carried out by the social scientists (consultants) whose qualifications, experience, and TOR are cleared by the Bank. 22. Information will be gathered from separate group meetings: ethnic minority leaders. ethnic minority men; and ethnic minority women, especially those who live in the zone of influence of the proposed work under sub-Project. Discussions will focus on sub~Project impacts: positive and negative, and recommendations for design of sub-Project. The local Women's Union will be responsible for analyzing the SA. and for leading the development of an action plan with the ethnic minority leaders, Project engineers and other staff {fthe SA indicates that the potential impact of the proposed sub-project will be significantly adverse or that the ethnic minority community rejects the project. the sub-Project will not be implemented in that locality; no further action is needed in this case. 23. If the ethnic minority supports the sub-Project implementation an EMDP will be developed. 7. ETHNIC MINORITY DEVELOPMENT PLAN 24. The action plan will consists of a number of activities and will include mitigation measures of potentially negative impacts, modification of sub-project design, and development assistance. Where there is land acquisition in ethnic minority communities, the project will ensure that their rights will not be violated and that they be compensated for the use of any part of their land in a manner that is culturally acceptable to them. The compensation and rehabilitation will follow the Resettlement Policy Framework of the project. An Ethnic Minorities Development Plan will include: (1) Legal Framework (2) Baseline data, (3) Land tenure information, (4) Local participation (5) Technical identification of development or mitigation activities, (6) Institutional arrangement, (7) Implementation schedule; (8) Monitoring and evaluation, and (9) Cost and financing plan. 8. IMPLEMENTATION ARRANGEMENT 25. Consultants will also be responsible for training respective PCs. local Women's Union or a similar social organization to undertake the work of consultation, screening, social impact assessment, analyses and preparing EMDPs. 26. PCs of the EVN and local authorities (People's Committees, Committees for Ethnic Minorities and Mountainous Areas Resettlement Committees, Women Union and Land Departments etc. at different levels) are responsible for implementing EMDP (arrange adequate staff and budget). 9. MONITORING 27. Implementation of the EMDPs will be regularly supervised and monitored by PCs of EVN and respective Peoples' Committees and Committees for Ethnic Minorities at provincial and district levels. The findings and recommendations will be recorded in quarterly reports and to be furnished to EVN and World Bank office in Vietnam. 28. The independent agency or agencies which would be used by PCs to undertake external monitoring and evaluation of the implementation of resettlement action plans for the Project will also be tasked with monitoring the activities for EMDP. The external monitoring agency will visit a sample of affected households in each relevant province on an annual basis. 10. SCHEDULE 29. The EMDP should have an implementation schedule that is coordinated with the sub-project implementation. Logically, social impact assessments and group meetings should be undertaken before sub-project designs are prepared. Compensation for land acquisition should be satisfactorily completed at least one month prior to start of civil work. Monitoring should take place at the recommended times during project implementation. 11. BUDGET 30. The EMDP, while provides development activities, will include information on detailed cost of mitigation measures and other rehabilitation entitlements for ethnic minority in the affected areas. Sources of funding for the various activities and financing plans will be clearly specified in the cost tables. 12. REPORTINGIDOCUMENTATION 31 . The EMDPs will be prepared and submitted by PCs to EVN and then the World Bank at the same time that respective PCs submit their annual work programs to EVN and the World Bank for review. When EVN submit the final annual work programs of all the provinces to the World Bank for approval, an integrated EMDP report for the provinces will also be furnished. Annexes: 1. Annex 1: Ethnic Minorities Screening of Village 2. Annex 2: Social Assessment ANNEX 1: ETHNIC MINORITY SCREENNING Province: ______ District:_ _ _ _ _Commune:_ _ _ _ _ _ Sub-prolect: _________ _____ J Person iRate of Village Village EM in with with EM Groups in IHH Person the 90- 50- lRemarks District/com Village in project area averag Total EM Total comm 100% 90 ct/ct munewith the project e HHs persons unitity EM EM Ems are EM groups HHs Total Male Femae, e % 11Femai , iI.District I 'I.I.Commune I I.2.Commune ! i ! ! i , I I i ANNEX 2: SOCIAL ASSESSMENT 1. The breadth, depth, and type of analysis required for the social assessment are proportional to the nature and scale of the proposed project's potential effects on the ethnic minorities. 2. The social assessment includes the following elements: (a) A review, on a scale appropriate to the project, of the legal and institutional framework applicable to ethnic minorities. (b) Gathering of baseline information on the demographic, social, ciltural, and political characteristics of the affected ethnic minority communities, the land that they traditionally owned or customarity used or occupied, and the natural resources on which they depend. (c) Taking the review and baseline information into account, the identification of key project stakeholders and the elaboration of a culturally appropriate process for consulting with the ethnic minorities at each stage of project preparation and implentation. (d) An assessment based on free, prior, and informed consultation, with the affectad ethnic minority communities, of the potential adverse and positive effects of the project. Critical to the determination of potenial adverse impacts is an analysis of the relative vulnerablity of, and risk to, the affected ethnic minority communities given their district circumstances and close ties to land and natural resources, as well as their lack of access to opportunities relative to other social groups in the communities, regions, or national societies in which they live. (e) The identification and evaluation, based on free, prior, and informed consultion with the affected ethnic minority communities, of measures necessary to avoid adverse effects, or if such measures are not feasible, the identification of measures to minimize, mitigate, or compensate for such effects, and to ensure that the ethnic minority groups receive culturally appropriate benefits under the project. Appendix 3 Preliminary Screening of the EMs in the Project Areas Appendix 3 Preliminary Screening of the EMs in the Project Areas Province: District: Commune: Sub-project: _ _ __ --- I Rate of EM EM Groups in projed PersonfHH Village with Village with Total Person in the Remarks District/commune with Total area average 90·100% EM SO-90%EM EM communitity Ems persons -- HHs EM groups Total Male Female Female % ----~ Tan Yen District --- 1. Nha Nam Commune 28 112 Nung, Tay, Dao 112 62 50 55% 4 4 x ------ ~. Quang Tien 100 405 Nung, Tay, Dao 405 207 198 51% 4.05 5 x Commune 3. Song Van Commune 17 72 Tay, Nung 72 28 24 54% 4.2 3 x ,-- ~. Tan Trung Commune 36 166 Tay, Nung, Cao Lan 166 86 80 52% 4.6 4 x 5. Phuc Hoa Commune 50 201 Cao Lan, San Diu, Nung 201 105 96 52% 4 4 x --- tue Nam District --- I. Cam Ly Commune 105 430 San Diu 430 219 211 51% 4 2 x 2. Dong Hung Commune 855 3.548 Hoa, Tay, San Diu, Nung 3.548 1.808 1.740 51% 4.15 5 x ---- -- 3. Huyen Son Commune 106 672 Tay, Nung, Hoo, San Diu 672 356 316 53% 4.2 6 x ------ ----- ~. Tam Di Commune 655 2.685 Tay, Nung 2.685 1.369 1.316 51% 4.1 3 x -- --- tLue Ngan District --- 1. Bien Dong Commune 522 2.115 Nung, San Diu, Tay 2.115 1.121 994 53% 4.05 3 x --- ~:;hong Van Commune 443 1.772 Tay, Nung 1.772 921 --- 851 52% ----- 4 2 x San Diu, Hoa, Tay, San 3. Quy Son Commune 430 1.806 1.806 939 867 52% 4.2 5 x --- - - Chi • 4. Tan Quang Commune 124 508 Nung, Hoa, Tay, Dao 508 259 249 51% 4.1 4 x 5. Tan Son Commune 920 3680 Nung, Tay 3.680 1.877 1.803 51% 4 2 x Lang Giang District ~ I' l.Nghia Hung 33 135 Nung, Hoa, Tay, San Diu 135 72 63 53% 4.1 4 x Commune Yen The District --- I. Dong KyCommune 240 1.008 Tay, Nung, Cao Lan 1.008 514 494 51% 4.1 3 x ~- --- ,2. Dong Tam Commune 66 264 Tay, Nung 264 145 119 55% 4 2 x Nung, Hoa, Tay, Cao 3. Buong Vi Commune 34 146 146 77 69 53% 4.3 5 x Lan, San Chi --- ~. Tam Hiep Commune 727 3.054 Tay, Nung, Cao Lan 3.054 1.588 1.466 52% 4.2 3 x - -- Tay, Nung, Cao Lan, San 5. Tam Tien Commune 290 1160 1.160 592 568 51% 4 4 x Diu --- Appendix 4 Social Assessment Social Impact Assessment Province: Ngbe An District: Commune: Demof!rapbic Social Cultural and Economic Situation 1. Percentage of ethnic minority households below the poverty line (according to MO) 5% 2. Number of ethnic minority girls attending elementary school 12% 3. Number of ethnic minority boys attending elementary school 18% 4. Number of ethnic minority girls attending secondary school 18% 5. Number of ethnic minority boys attending secondary school 21% 6. Average number of visits to the hospital by each ethnic minority household per year 1 7. Availability of water supply facility (wells, piped water, etc) in the community Yes x No- - - 8. Availability of electricity in the community Yes x ; No_ _ 9. No. of households in community with connection to electricity 10 Economic information of ethnic minority community. a) Types of natural resources in the area: Natural Resource I Check Natural Resource Check i. Forest I v iv. ii. Lake, river ! v v. I V VI. i b) Economic and livelihood systems: Main Activity % ofEMHHs Secondary Activity % of EM i. Secondary 25% i. Secondary . agriculture agriculture I ii. Shifting I 35% ii. Shifting agriculture : agticulture i I I iii. Landless fann i 5% iii. Landless fann ! i worker worker : iv. offfann work 5% iv. off fann work v. govt. employees 35% v. govt. employees VI. VI. 11. Tenure systems of main ethnic groups: briefly describe land ownership and tenure systems (e.g., communal ownership, private ownership, gender differences in ownership, etc.). Private ownership 12. Social information of ethnic minority community. a) Key social and cultural systems of main ethnic groups: e.g., group travels frequently to visit relatives in other communes, men travel alone but women do not travel alone; men stay at home while women work in the fields; boys go to school but girls are not allowed; group members intermarry with other members of other groups, etc. Men travel alone but women do not travel alone b) Social groupings of main ethnic groups: briefly ethnic types of groupings: e.g., formal and informal leaders (such as spiritual leaders, traditional healers), formal and informal groups such as farmers', women's, youth's, elderly, etc., who are the decision makers in the households? In the community? Men are the decision makers B. Social, Cultural and Economic Impact • Getting views from men and women on: 1. Potential positive impacts: a. Potential employment during sub-project construction, or increased access to employment once the sub-project constructed Yes , No _ _ __ Comments: Priority to employ the local employee when implementing the project b. Increased access to electricity Yes - - - -,No ---- Comments: Open training courses on electricity c Other positive impacts in social and economic development: Stable the high voltage system 2. Potential negative impacts: a. Electric security: Yes . No _ _ __ Comments: Forbid to violate the RO W b. Physical and social problems related to sub-project: Yes __v_ ; No _ _ __ Comments: Make the life complicated c Land acquisition for sub-project construction: Yes - -v- - :No - - - Comments: Loss productive land d. Threats to cultural properties and resources, such as archaeological sites and historical monuments, sacred and ceremonial sites, graveyards, medicinal plants, etc.; in zone of influence: Yes -------- ; No --------- Comments: Affect to production e. Other negative influence: C. Suggestions and Recommendations for Sub-Project From men: Hire men string conductor and extravate foundation • From Women: Hire women cooking to serve workers Do not disturb women D. Other Comments: Support cost for buying conductor from meter to HH " Proposed Action Plan 1 Mitigation measures Potential of negative impacts: Identification of potentially negative impacts through consultation with EM and local authorities. Mitigation measures Information from the SIA and meetings with the ethnic minority communities will be used by the Project Engineer in preparing the design, construction schedule and construction measures for the sub-projects and the estimated cost of required work. These will include: • a. Recommendations for changing line alignments, locations, construction measures and construction schedule for sub-projects to accommodate needs and preferences of ethnic minorities: Try to avoid the EM residential land b. Identify areas for particular cultural, spiritual or ecological sensitivity which should be considered in design and construction activities: Avoid constructing in the sensitive areas such as particular cultural, spiritual or ecological sensitive • c Develop a program for communication, information and education by the commune for the ethnic minority community in the zone of influence on electric safety, potential health and social problems Open training courses; build cultural house or cultural post d. Land acquisition and compensation: Where there is land acquisition in ethnic minorities, the project will ensure that their rights will not be violated and that they will be compensated for the use of any part of their land in a manner that is culturally acceptable to them The compensation will follow the Resettlement Policy for Project Affected Person under the Project. Ethnic minority leaders will assist with consultation of affected households and with compensation activities. 2 Technical Identification of Development Assistance The province through its regular development program will provide assistance to the ethnic minorities living in the sub-project areas, e.g. priority for those living near the influenced areas in getting employment in sub-project construction and maintenance. Priority for accessing to credits of Bank for Agricultural and Rural Development in medium and long terms. Assistance for agricultural development such as land reclaimation. Where the areas overlap with other World Bank financed projects, ethnic minority areas will be targeted wherever possible. Training: The Project will provide trainings for EM in the influenced areas on training on electricity safety, agricultural extension. It will also include ethnic minority leaders in training sessions on SIA resettlement, and participatory monitoring for EMDP implementation. Gender Assistance: Special consultation and training for women, especially female~headed households (such as credits, agricultural extension, fertilizer • use, etc.). List proposed development assistance and schedule: Proposed Assistance Responsible Group Schedule 1 Training on agri cultural included: + Training on new varieties of nce + Training on breeding ! ! livestock I + Training on using fertilizer : 2 Training on electricity safety • 3 Institutional arrangement. • Describe about all required activities and responsible institutions No. Action Responsible Institution 1 Training on agricultural included: PMB Bac Giang, local + Training on new varieties of rice i authorities, provincial + Training on breeding livestock I association of encourage i + Training on using fertilizer . agriculture 2 Training on electricity safety PMB Bac Giang, local authorities 4 Implementation schedule Figure out the schedule for each action No. Action Schedule 1 Training on agricultural included: QIIII2010 • + Training on new varieties of rice i + Training on breeding livestock I + Training on using fertilizer i 2 Training on electricity safety I QIII/2010 5 Monitoring and evaluation Describe the indicators to be monitored, institution (s) responsible for monitoring, requirement for monitoring reports. Activity Monitoring Visited by If completed Schedule (x) 1 Screening 1112009 x 2 Conduct SIA 1112009 3 Discuss fmdings of SIA 1112009 with community • 4 preparation of Action Plan 12/2009 5 Discussion with local i authorities, engineer of 12/2009 I mitigation measures Visit one month prior to /6 construction work 1012010 lMA Visit one month after 17 construction work 10/2010 IMA 8 Visit six months after 5/2011 IMA construction work 6 Cost and financing plan. Estimated cost for IPDP and financing resources . • I Proposed assistance Unit cost Quantity Total cost (VND/class) • i i 1 Programme preparation 5.000.000 - - 2 Training on agriculture 1.000.000 - - 3 Training on electricity 1.000.000 - - safety 4 Training documents 1.000.000 - - Implementation cost - Contingency 10% - Total - Consultation Schedule for EMs TASK ! RESPONSIBLE MATERIAL & WEEK PERSON FORMS 1 2 3 4 5 1 Inform ethnic minority commune PC,PMBor Project brochure x leaders and local authority about consultants!distri (PMB to provide the sub-project ct trained Staff sample) I 2 Conduct screening to Consultant, Provide x determine types and numbers trained District Screening/EM of ethnic minority households Staff Inventory Form living in area of zone of I influence of sub-project. I 3 Request EM commune leaders, PC, PMB under Official letter Ix local authorities to help with PCandEVN • completing Screening/EM I Inventory 4 Undertake social impact Consultants, SIAForm x assessment ethnic minority trained District households in zone of Staff (under influence/area of sub-project. guidance from Conduct focus group PMB) discussions with three separate groups of ethnic minorities as part of SIA: leaders, men, and women 5 Analyze and write up findings Ditto SIAForm x ofSIA I 6 Meet EM leaders and members Consultants, x and discuss fmdings of SIA district trained Staff I I 7 Prepare Action Plan with local Consultants Action Plan Form x authorities, ethnic minority r representatives and their leaders I 8 Meet with designed Engineers Consultants, local x • to discuss feedback from the trained staff commune and use information to design and mitigation I measures ! 9 Send all Inventories, SIAs, Consultants x Action Plan to PMB 10 Summarise information and PC,PMBs x submit to IDNWB, Important - the reports should be submitted with submission of it proposed sub-project Program I 11 Monitor implementation of IC,IMB,I..aa Monitoring Ethnic Minority Action Plan AI.iln:1i:s, Reports :Rtp.t;s:ti3i\esciEM, irl;:m:i.rtMriiir RAP" . i :